Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout177-039 STATE OF ALASKA �SKA OIL AND GAS CONSERVATION COMMIS WELLN PLETION OR RECOMPLETION REPO AND LOG la. Well Status: Oil ❑ Gas ❑ SPLUG 0 Other 0 Abandoned 0 " Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0 GINJ ❑ VVINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero ' Service IZI'Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 2/8/2016 • 177-039 • 315-691 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 11/3/1977 50-029-20259-00-00 ' 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 11/17/1977 PBU 09-18 • Surface: 642'FSL,224'FVVL,Sec.01,T1ON,R15E,UM • 9 Ref Elevations KB 54 17. Field/Pool(s): Top of Productive Interval: 1257'FSL,1115'FEL,Sec.02,T1ON,R15E,UM GL 20.5 • BF 21.32 • PRUDHOE BAY,PRUDHOE OIL • Total Depth: 1354'FSL,1194'FEL,Sec.02,T1ON,R15E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 8972'/8735' ADL 028327 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 718627 y- 5942116 Zone - ASP 4 • 9450./9199' • 74-017 TPI: x- 717269 y- 5942693 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 717188 y- 5942788 Zone - ASP 4 N/A 1900'(Approx.) 5. Directional or Inclination Survey: Yes ❑ (attached) No El 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 None (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary BHC/DIL/GR,FDC/CNL/GR/CAL,CNL/GR/CCL,FDL,Gyro ;.,C,ANNEGJ I I_!N 2 7 2U {1 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 94# H-40 33' 111' 33' 111' 30" 258 sx Arctic Set II 13-3/8" 72# N-80 33' 2713' 33' 2713' 17-1/2" 5500 sx Arctic Set 9-5-/8" 47# soo-ss/N-fio 31' /SM-95 9435' 31' 9185' 12-1/4" 1000 sx Class'G',180 sx Arctic Set 7" 29# L-80 8638' 9353' 8411' 9105' Scab Liner 175 sx Class'G' 24. Open to production or injection? Yes 0 No El 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 7",26#x 4-1/2",12.6#,L-80 8719' 8607'/8381' tt8A4ii oa Nc0 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. D TF Was hydraulic fracturing used during completion? l S 1 I. O Per 20 AAC 25.283(i)(2)attach electronic and printed Yes ❑ No 0 . 2 VERIFIED RECEIVED information __L,L" J DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 0 7 2016 9010' Set Posiset Plug MAR9005' 8 Gal Cement e)GCC 8972' Set Whipstock 27. �1 PRODUCTION TEST Date First Production: Not on Injection Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period `4P Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corn): Press 24 Hour Rate ""6 Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only /� vTI. 573/J / t--`'ws� RBDMS '' MAR 0 9 2016 • A - fC `�ti 28. CORE DATA • Conventional Core(s) Yes ❑ No RI • • Sidewall Cores Yes 0 No 0 • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No 0 Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 8934' 8698separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top of Sadlerochit 8934' 8698' OWC 9322' 9075' Base of Sadlerochit 9330' 9083' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Report,Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ciolkosz,Ryan R Email: Ryan.Ciolkosz@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: PI rune: +1 907 564 4091 Date: 3/1 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • • 09-18, Well History (Pre-Rig Sidetrack) ' , INITIAL T/I/O= 0/80/80. RUN1: RIH WITH MILL TOOLSTRING. OAL= 34'.7'; OAW= 550 LBS; MAX OD = 3.803" (MILL OD). MILLED XN NIP AT 8706'. AFTER POOH BIT MEASURED AGAIN ON SURFACE OD = 3.802". RUN2: RIH WITH MPBT POSISET PLUG TOOLSTRING. OAL= 34 FT; MAX OD = 2.125"; OAW= 300 LBS. POSISET PLUG SET AT 9010'. (TIE-IN LOG: SLB MEMORY GR/CCL 14-JUN-2012) PLUG SET CONFIRMED AT SURFACE. RUN3: RIH WITH 12/2/2015 DBA/CMT RUN 1/2. OAL =49FT; MAX OD = 2.125"; OAW=245 LBS. INITIAL T/I/O = 0/50/50 PSI. CONTINUE RUN 1/2 BAILER. GOOD INDICATION. POOH. RUN4: RIH WITH DBA/CMT RUN 2/2. OAL =49FT; MAX OD = 2.125"; OAW= 245 LBS. DUMP 5' (8 GALLONS) OF CEMENT. ESTIMATED TOC @ 9005'. GOOD INDICATION. POOH. RUN 5: RIH WITH 4.5"X 7" BAKER DELTA WHIPSTOCK. SET TOWS AT 8972' MD W/ORIENTATION 30 DEGREES LEFT OF HIGH SIDE (TIE-IN LOG: SLB MEMORY GR/CCL 14-JUN-2012) LOG OFF 12/3/2015 WHIPSTOCK TO CONFIRM GOOD SET. T/I/O=Vac/0/0. Pre Nordic 1. Set 6"TWC#423 at 135". R/U CTD TS#07 and PT to 5000 psi. Pass. 2/2/2016 Pt tree cap to 500 psi. Final WHP's TWC/0/0. Tree is fluid packed. T/I/O= TWC/0/80 Temp=SI. PPPOT-T RU 1 HPBT onto THA. Test void 0 psi. Pressure 5000 psi 2/4/2016 for 30 min test. 4900 psi 15 min, Test PASS. Bled THA to 0 psi RD test equipment. 2/5/2016 T/I/O=TWC/0/0 made changeout with day crew. PT'D upper tree[passed]. RDMO. T/IA/OA= TWC/0/0. Barriers = TWC & MV verrified by performing independent LTT. (Passed) N/D 6"x 7" upper McEvoy tree. N/U New 6"x 7" CIW upper tree (tag#101). Torqued to API. Specs. 2/5/2016 769 ft lbs. L7M Non;Coated). Made change-out with night crew. T/I/O=TWC/80/80. Temp = SI. Bleed WHPs (Pre Rig). IA, OA FL near surface. No WH, flowlines or scaffold. Bled OAP to BT from 80 psi to 0 psi in 15 min (Gas). During OA bleed, IAP decreased 60 psi. Bled IAP to BT from 20 psi to 0+ psi in 15 min (Gas to energized fluid, —2 gal). During 30 min monitor IAP &OAP increased 5 psi. Final WHPs=TWC/5/5. SV, WV= ? SSV= C. MV=O. 2/6/2016 IA, OA= OTG. NOVP. 01:50. • • North America-ALASKA-BP Page 1 a( Operation Summary Report Common Well Name:09-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/6/2016 End Date:2/13/2016 X3-017GY-C:(3,511,086.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NORDIC 1 Spud Date/Time:11/3/1977 12:00:00AM Rig Release:2/15/2016 Rig Contractor:NORDIC CALISTA UWI:500292025900 Active datum:21 :18 11/3/1977 00:00 @54.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/6/2016 19:00 - 20:30 1.50 MOB I P PRE RIG DOWN AND PREPARE TO MOVE RIG OFF WELL 20:30 - 21:30 1.00 MOB P PRE MOVE RIG FROM 09-02ATO 09-18A -HOLD PJSM FOR MOVING OFF WELL 09-02A WSL VERIFIED THE FOLLOWING PRIOR TO MOVING OFF WELL 09-02A PHYSICAL BARRIERS ARE IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREE/WELLHEAD ESD IN CELLAR IS OPERABLE AND MANNED BY THE TOOLPUSHER RADIO COMMUNICATION VERIFIED FOR ALL INDIVIDUALS INVOLVED IN THE MOVE THE AGREED"COMMAND"TO STOP THE RIG MOVE IS UNDERSTOOD BY ALL -PULL RIG OFF WELL AND MOVE TO 09-18A 21:30 - 22:00 J 0.50 MOB P PRE MOVE RIG ONTO 09-18A HOLD PJSM FOR MOVING ONTO WELL 09-18A WSL VERIFIED THE FOLLOWING PRIOR TO MOVING ONTO WELL 09-18A PHYSICAL BARRIERS ARE IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREE/WELLHEAD ' ESD IN CELLAR IS OPERABLE AND MANNED BY THE TOOLPUSHER RADIO COMMUNICATION VERIFIED FOR ALL j INDIVIDUALS INVOLVED IN THE MOVE j THE AGREED"COMMAND"TO STOP THE RIG MOVE IS UNDERSTOOD BY ALL ***RIG ACCEPTED AT 22:00*** 22:00 - 00:00 2.00 MOB P PRE RIG UP -RIG UP CELLAR AND CYCLE TREE VALVES TAKE RKB MEASUREMENTS -INSTALL SLB SSV PANEL HOSES AND STROKE OPEN SSV,INSTALL AND ADJUST FUSIBLE CAP AND DUMP SSVAGAINST FUSIBLE CAP -BLEED OFF TREE CAP PRESSURE -LEAK TIGHT TEST TREE VALVES-GOOD -NIPPLE DOWN TREE CAP FLANGE 2/7/2016 00:00 - 02:30 2.50 BOPSUR P PRE RIG UP AND NU BODE -NIPPLE UP BOPE,INSTALL HOT TUB -SPOT IN CUTTINGS BOX,TIGER TANK,FUEL TRAILER,MU AND PT HARDLINE -MOVE SATELLITE OFFICE AND CONNECT POWER CABLES 02:30 - 05:00 2.50 BOPSUR j PRE PRESSURE TEST BOP -FLOOD LINES -PERFORM SHELL TEST TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINS -HOLD H2S/RIG EVACUATION DRILL W/AAR -AOGCC REP CHUCK SCHEVE WAIVED WITNESS BY EMAIL AT 14:28 ON 02/06/2016 Printed 2/22/2016 1:04:47PM • • North America-ALASKA-BP • Page 2 d Operation Summary Report Common Well Name:09-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/6/2016 End Date:2/13/2016 X3-017GY-C:(3,511,086.00) Project Prudhoe Bay Site:PB DS 09 Rig Name/No.:NORDIC 1 Spud Date/Time:11/3/1977 12:00:00AM Rig Release:2/15/2016 Rig Contractor:NORDIC CALISTA UWI:500292025900 Active datum:21 :18 11/3/1977 00:00©54.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 10:45 5.75 BOPSUR P PRE PRESSURE TEST BOP -PRESSURE TEST BOP TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES PER NORDIC, BP AND AOGCC 10:45 - 11:00 0.25 BOPSUR P PRE PJSM TO PU THE INJECTOR,STAB ON AND TEST THE IRV AND PACK OFF 11:00 - 12:30 1.50 BOPSUR P PRE TEST IRV&PACK OFF 12:30 - 13:05 0.58 BOPSUR P PRE GOOD TEST,HOLD A PJSM TO PRESSURE TEST HARDLINE TO 4700 PSI 13:05 - 13:25 0.33 BOPSUR P PRE PRESSURE UP TO 250 LOW AND 4700 HIGH 13:25 - 13:35 0.17 BOPSUR P PRE GOOD TEST TO 4700 PSI,BLEED OFF PRESSURE 13:35 - 13:50 0.25 BOPSUR P PRE HOLD A PJSM TO PUMP SLACK,CUT COIL AND HEAD UP BHI 13:50 - 14:30 0.67 BOPSUR j PRE DISPLACE DIESEL OUT OF COIL WITH FRESH WATER 14:30 - 15:05 0.58 BOPSUR P PRE SLACK PUMPED,PU THE INJECTOR,RU THE CUTTER AND CUT PIPE 15:05 - 16:10 1.08 BOPSUR P PRE GUT 290',DRESS THE END OF THE COIL MU THE DIMPLE CTC PULL TEST CTC TO 44K 16:10 - 16:30 0.33 BOPSUR P PRE STAB ON LUBRICATOR AND PUMP SLACK FORWARD 16:30 - 17:40 1.17 BOPSUR P PRE HEAD UP 17:00 GREASE CREW ON LOCATION TO TORQUE TREE BOLTS PT CTC&BHI UQC 17:40 - 18:00 0.33 BOPSUR P PRE HEADED UP,PERFORM RIG EVAC DRILL WITH THE DAY CREW 18:00 - 18:30 0.50 BOPSUR P PRE HOLD A PJSM WITH THE VALVE CREW TO LOAD THE VC LUBRICATOR ON THE RIG TO PULL THE TWC PT BHI UQC FLOATS 18:30 - 18:45 0.25 BOPSUR P PRE GOOD TEST,RD THE TEST EQUIPMENT 18:45 - 19:30 0.75 BOPSUR P 1 PRE LOAD VC HANDLING TOOLS AND LUBRICATOR ON THE RIG 19:30 - 20:15 0.75 BOPSUR P PRE PULLTWC -HOLD PJSM -INSTALL LUBRICATOR ON RISER -PT LUBRICATOR 250 PSI LOW/3500 PSI HIGH FOR 5 CHARTED MINUTES EACH- GOOD TEST 20:15 - 21:30 1.25 BOPSUR N SFAL PRE I MASTER VALVE IS PRESSURE LOCKED- CANNOT OPEN -HOLD PJSM -GREASE CREW ATTEMPTED TO BLEED PRESSURE FROM BLEED PORT AND STEM PACKING PORT BUT UNABLE TO BLEED -PRESSURE UP ABOVE TWC WITH TEST PUMP TO 3500 PSI AND OPEN MASTER VALVE,BLEED OFF 3500 PSI FROM LUBRICATOR Printed 2/22/2016 1:04:47PM • North America-ALASKA-BP • Page 3 c10-.1 Operation Summary Report Common Well Name:09-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/6/2016 End Date:2/13/2016 X3-017GY-C:(3,511,086.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NORDIC 1 Spud Date/Time:11/3/1977 12:00:00AM Rig Release:2/15/2016 Rig Contractor:NORDIC CALISTA UWI:500292025900 Active datum:21 :18 11/3/1977 00:00 @54.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 22:30 1.00 BOPSUR P PRE PULLTWC -HOLD PJSM -STROKE IN AND ENGAGE TWC -PULL TWC,ZERO PRESSURE ON TUBING -CLOSE MASTER VALVE AND PERFORM LEAK TIGHT TEST-GOOD -POP OFF LUBRICATOR AND RETRIEVE TWC -ALL COMPONENTS RECOVERED -RIG DOWN LUBRICATOR,CLEAR RIG FLOOR 22:30 - 00:00 1.50 BOPSUR P PRE PREPARE TO BULLHEAD KILL WELL -HOLD PJSM -INSTALL INJECTOR AND PT QTS LOW 250 PSI/HIGH 3500 PSI FOR 5 CHARTED MINUTES EACH-GOOD TEST DISPLACE COIL WITH WARM KCL AT 3.1 BPM AND 1930 PSI 2/8/2016 00:00 - 02:30 2.50 BOPSUR I PRE BULLHEAD KILL WELL -SPEAR IN WITH 10 BBLS MEOH PUMP DOWN•KILL LINE AND COIL AT 7 BPM, 3170 PSI WHP FOR 350 BBLS -WHEN KCL REACHED PERFORATIONS,WHP DROPPED TO 2900 PSI AT 7 BPM -TOTAL KCL PUMPED=520 BBLS SHUT DOWN,10 MIN FLOWCHECK-STATIC -PUMP ACROSS THE TOP TO DETERMINE LOSS RATE,NO LOSSES OBSERVED 02:30 - 04:00 1.50 BOPSUR P PRE i BULLHEAD 9.5 PPG MUG PUMP DOWN KILL LINE AND COILAT INITIAL PRESSURE OF 2600 PSI AT 6 BPM,4000 PSI CIRC PRESSURE -PUMP 350 BBLS MUD,FINAL CIRCULATING PRESSURE=2500 PSI AT 6 BPM,4300 PSI CIRC PRESSURE 04:00 - 05:15 1.25 STWHIP P WEXIT MU 3.80"WINDOW MILLING BHA -HOLD PJSM FOR MAKING UP BHA -MU WINDOW MILLING BHA -STAB ON INJECTOR -PT QTS LOW 250 PSI/HIGH 3500 PSI FOR 5 !CHARTED MINUTES EACH-GOOD TEST "INJECTOR ON WELL AT 0500** 05:15 - 07:00 1.75 STWHIP P WEXIT RIH WITH 3.80"WINDOW MILLING BHA -CIRCULATE THROUGH MGS WHILE RIH -MM IN/OUT: 1.70/1.70 BPM -MW IN/OUT:9.54/9.54 PPG -PVT=240 BBLS -LOSSES<1 BPH 07:00 - 07:35 0.58 STWHIP P WEXIT LOG TIE IN 07:35 - 07:50 0.25 STWHIP P WEXIT CORRECT DEPTH-16.5',CLOSE THE EDC AND RIH TO TAG THE PINCH POINT PINCH POINT IS 5.3'FROM THE TOWS AT 8972' 07:50 - 08:00 0.17 STWHIP P WEXIT TAG PINCH POINT AT 8977.9' PU AND START PUMPING WORK DOWN TO FIRST MOTOR WORK Printed 2/22/2016 1.04:47PM • North America ALASKA-BP Page 4 Qtt.,, Operation Summary Report Common Well Name:09-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/6/2016 End Date:2/13/2016 X3-017GY-C:(3,511,086.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NORDIC 1 Spud Date/Time.11/3/1977 12:00:00AM Rig Release 2/15/2016 Rig Contractor.NORDIC CALISTA UWI:500292025900 Active datum:21 :18 11/3/1977 00:00 @54.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 11:50 3.83 STWHIP P WEXIT FIRST MOTOR WORK AT 8976.8' START MILLING WINDOW AS PER PLAN 9A-04114- FREE SPIN=2750 PSI AT 2.75 BPM 01,0 RATE IN=2.71 BPM RATE OUT=2.69 BPM 1 MW IN=9.53 PPG MW OUT=9.46 PPG ECD =10.30 PPG ROP=1 FPH WOB=1.11 K CIRC PSI=2842 PSI IAP=27 PSI OAP=29 PSI PVT=278 BBLS 08:20 STOP MILLING,WOB NOT READING,BHI IS REBOOTING THEIR MWD COMPUTER 08:40 WOB WORKING,CONTINUE MILLING 11:50 - 14.00 2.17 STWHIP P WEXIT CONTINUE MILLING WINDOW FREE SPIN=2750 PSI AT 2.75 BPM RATE IN=2.67 BPM RATE OUT=2.69 BPM MW IN=9.53 PPG MW OUT=9.47 PPG ECD =10.06 PPG ROP=1 FPH WOB=1.74 K CIRC PSI= 2736 PSI IAP=45 PSI OAP=60 PSI PVT=284 DRAINED MUD FROM MGS INTO THE PITS AFTER FIRST BOTTOMS UP MAGNETS GETTING PRETTY FURRY WITH METAL 14:00 - 17:20 3.33 STWHIP P WEXIT CONTINUE MILLING WINDOW STOPPING WHEN WOB REACHES 4.4K WOB AS PER BTT FREE SPIN=2750 PSI AT 2.75 BPM RATE IN=2.68 BPM RATE OUT=2.70 BPM MW IN=9.52 PPG MW OUT=9.48 PPG ECD =10.08 PPG ROP=1 FPH WOB=3.78 K CIRC PSI= 2823 PSI IAP=68 PSI OAP=100 PSI PVT=281 17:20 - 21:00 3.67 STWHIP P WEXIT CONTINUE MILLING WINDOW STOPPING WHEN WOB REACHES 4.4K WOB FREE SPIN=2750 PSI AT 2.75 BPM RATE IN=2.70 BPM RATE OUT=2.68 BPM MW IN=9.52 PPG MW OUT=9.47 PPG ECD =10.09 PPG ROP=1 FPH WOB=4.29 K CIRC PSI= 2959 PSI IAP=114 PSI OAP=182 PSI PVT=279 BOTTOM OF WINDOW 8988'(UNCORRECTED) 21 00 - 00.00 3.00 STWHIP P WEXIT MILL RATHOLE -CONTROL MILL TO 8989'FOR REAMER EXIT -MILL 10'RATHOLE TO 8999' IN/OUT RATE=2.70/2.71 BPM -IN/OUT DENSITY=9.52/9.46 PPG 2/9/2016 00.00 02.15 2.25 STWHIP P WEXIT DRESS AND DRIFT WINDOW -BACKREAM WINDOW WITH AS-MILLED TFO AT 1 FPM -BACKREAM WINDOW 15°LEFT AT 1 FPM -BACKREAM WINDOW 15°RIGHT AT 1 FPM -DRY DRIFT WINDOW,PICK UP AND OPEN EDC TD SAMPLE CONFIRMS KICKOFF WITH 80% _ SHALE/COAL AND 20%SAND Printed 2/22/2016 1.04.47PM TREE= FMC GEN WELLHEAD= FMC M SillfY NOTES:H2S READINGS AVERAGE 125 ACTUATOR= AXELSON 09-18 ppm W E MON MI.WELL REQUIRES A SSSV OKB.ELEV= 54' WHENON 'BF.-ELEV= ? I KOP= 4001' Max Angle= 20° +6232' 2148' —T CAM BAL-O SSSV NP,D=5.937" 'Datum LC= 9094' fiC...) 1: Datum TVD= 8800'SS 13-3/8"CSG, 72#,MTI-80,D=12.347" —I 2713' Minimum ID =3.80" @ 8706' 4-1/2" OTIS XN NIP MILLED T TBG,26#,L-80, .0383 bpf,D=6.276" H 8603' 8603' 7"X 4-1/2"XO,D=3.958' >r 8606' —9-5/8"X 4-1/2"BAKER MODEL D FICR TOP OF 7"LNR H 8638' L f I] 8706' H4-1/2"OT5 XN NP MLLED TO 3.80"(12/2/15)8717' H4-1/2"BAKER SFEAROUT SUB 112"TBG, 12.6#,L-80,.0152 bpf,13=3.958" — 8718' / 8718' —4-1/2"VLEG,D=3.958" R3RFORA TION SUA+MA RY REF LOG:BHCS ON 11/16/77 8702' —EAU TT LOGGED 06/13/91 ANGLE AT TOP PERF: 14°Q 8935' 8972' —7"BKR DELTA WS(12/03/15) Note:Refer to Production DB for historical perf data SIZE SPF NTBRVAL Opn/Sgz SHOT SQZ 6.4.4.6.4.6.6.1 5' Hol. PE)CMT(12/03/15) 3-3/8" 18 8935-8950 S 12/08/95 11/28/13 9010• —T FOSISET PLUG(12/02/15) 3-1/8" 4 8982-9002 S 04/06/84 1128/13 2-1/2" 5 9015-9055 S 05/26/03 01/02/14 3-1/8" 4 9020-9038 S 06/01/91 01/02/14 3-3/8" 4 9050-9060 S 05/26/03 01/02/14 Xi,. 9093' H9-518"X 7"BAKER ECL P(R 3-3/8" 6 9070-9101 S 11/24/91 01/02/14 3-1/8" 4 9126-9142 S 02/16/78 01/02/14 3-18" 4 9170-9177 S 02/16/78 01/02/14 S o: 9146' —19-5/8"X 7'BAKER ECL PKR 3-1/8" 4 9186-9190 S 02/16/78 01/02/14 3-1/8" 4 9209-9218 S 09/0285 01/02/14 3-1/8" 4 9228-9241 S 09/02/85 01/02/14 3-1/8" 4 9259-9267 S 09/02/85 01/02/14 3-3/8" 4 9276-9290 S 06/13/91 01/02/14 3-38" 6 9290-9292 S 06/01/91 01/02/14 7"LNR 29#,L-80, .0371 bpf,ID=6.184" H 9353' —4 9353' H7"BAKER V SET SHOE "lIal alit�����'�� 9371' —Ft3TD 9-5/8"CSG,47#, N-80,.0733 bpf,D=8.68VH 9432 1..........•••0 TD — 9450• ,•!�!�!�!�!�!�!�! v OF Tye • • evi) I//7,: THE STATE Alaska Oil and Gas F ofALAsKA Conservation Commission ri. __ 333 West Seventh Avenue k _ GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 ` h' Main: 907.279.1433 ° ' 'ALAS*P' Fax: 907.276.7542 www.aogcc.alaska.gov SCOW i W NO V 2 4 2.015 John McMullen Engineering Team Lead �, D 3 BP Exploration(Alaska), Inc. I P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool,PBU 09-18 Sundry Number: 315-691 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, A)37`�- Cathy . Foerster Chair DATED this /a day of November, 2015 Encl. eg,nv 1 6 2©15 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMM N APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown❑ Suspend 0 Perforate ❑ Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill fZ1 - Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other 0 lr T" 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 177-039 3_ Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development ❑ 99519-6612 Stratigraphic 0 Service Q 6. API Number: 50-029-20259-00-00 - 7, If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? - Will planned perforations require a spacing exception? Yes 9 No Q PBU 09-18 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028327 • PRUDHOE BAY,PRUDHOE OIL • (; 4' , t" S • .. 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 9450 • 9199 ' 9371 9123 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 78 20" 33-111 33-111 1530 520 Surface 2701 13-3/8" 33-2734 33-2734 5380 2670 Intermediate Production 9404 9-5/8" 31 -9435 31 -9185 6870 4760 Liner 715 7" 8638-9353 8411 -9105 8160 7020 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None 7",26#x 4-1/2",12.6# L-80 8719 Packers and SSSV Type: 4-1/2"Baker D Packer Packers and SSSV MD(ft)and TVD(ft): 8607/8381 No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal Q 13.Well Class after proposed work: BOP Sketch Q Detailed Operations Program ❑ Exploratory 0 Stratigraphic 0 Development ❑ Service Q 14.Estimated Date for Commencing Operations: November 15,2015 15. Well Status after proposed work: Oil 0 Gas ❑ WDSPL 0 Suspended Q 16.Verbal Approval: Date: WINJ 0 GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: Op Shutdown 0 GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ciolkosz,Ryan R Email Ryan.Ciolkosz@bp.com / Printed Name Jo)at1 Mc o• : Title Engineering Team Lead Signature O , / f Phone +1 907 564 4711 Date / / /771. . COMMISSION USE ONLY 4 Conditions of approval:Notify Commission so thatata representative may witness Sundry Number: �' Plug Integrity 0 BOP Test L� Mechanical Integrity Test ❑ Location Clearance ❑ Other: , 3 S-0 0 p 5:. 4 e r + c /6'0ae,C r ZO A4c-- 2.J• 1ILG E- � � . rn e. Spacing Exception Required? Yes 0 No 1 Subsequent Form Required: /b-- y 0 7 APPROVED BYTHE // Approved by:‘14 COMMISSIONER COMMISSION Date:K —/2—/ -- Olt *3------ 0RI .r� INAL RDMSOV 162015 Submit Form and Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • .5?..) //-/,•3• 4-..:- _A • • To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz :ID biD CTD Engineer Date: November 4, 2015 Re: 09-18 Sundry Approval Sundry approval is requested to plug the 09-18 wellbore as part of the drilling and completion of the proposed 09-18A CTD sidetrack. History and current status: 06/01/91: RWO to mitigate IAxOA communication. Ran 7" L80 scab liner to get better injection conformance. Also ran 7" x 4.5" L80 tubing. After RWO, Z1 was frac'd (160k prop behind pipe) and Z4 frac'd (29.5k lbs prop behind pipe). 09-18 is a currently actively producing waterflood pattern in the central drill site 09 area of the field. Historically this well was perfed in zone 1 and 2 during the period of pre- production and has since had perfs in all 4 Ivishak zones during its long injection history. Currently injection is dominated by at least 90% of injection into the zone 3 with average injection rates of-10,000 bwpd prior to being shut-in in 2012. Wellwork was discussed to isolate zone 3 to re-direct injection into lower watercut zones (2 and 4) rather than side-track the well. However, the QCLL scab liner that is the most effective way to isolate the perfs, requires cement behind it to insure isolation. Previous experience with cement squeezes in zone 3 indicate that there is a reasonable chance that we would not be able to get cement all the way to the top of the liner(and would not be able to get complete isolation from zone Proposed plan: Drill a through tubing sidetrack with the Nordic 1 Coiled Tubing Drilling rig on or around March 10th, 2016. E-line service unit will mill XN Nipple, Set Posiset Plug to isolate perforations below and set - whipstock pre drilling rig. Nordic 1 will a mill a 3.80"window in the 7"x9-5/8" liner and drill a Zone 2&4 well to 10,313 MD. The lateral will be completed with a 3-1/2" x 3-1/4"x2-7/8" 13CR-80 liner which will be cemented and perforated. This Sundry covers plugging the existing 09-18 perforations via the 09-18A liner cement job or liner top packer set post-rig (alternate plug placement per 20 AAC 25.112(i)) and via posi-set plug. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. (Ag /O o 7 re, 6, e)/rte r`i Q 1.../e// JY> .tD���e 7-4e �� qrC Prfp'd G > 7-44 per`)-14 fIPV Gno! e o✓ 1?Ov G�1101/1/ j�- , /HQ'o�� Fpa% j`� �� pool ,� fr�d� �� ���✓'� • • Pre-Rig Work Mill XN nipple. Set 4-1/2" x 7" Posi-Set plug. Set 4-1/2" x 7" Delta 1. E Whipstock 2. V Pre CTD Tree Work. Set TWC Rig Work: 4 4 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,543 psi. L 2. Mill 3.80"window plus 10' of rathole. Swap the well to 8.5 ppq drilling mud. 3. PU drilling BHA with GR/Resistivity 1 4. Drill 4.25" hole to TD at—10,313' MD 5. Run 3-1/2" x 3-1/4" L-80 liner leaving TOL at—8,650 MD. 6. Pump primary cement bringing TOC to TOL, 24 bbls of 15.8 ppg liner cmt planned* 7. Test liner lap to 2,400 psi. e> 8. Perforate liner per asset instructions 9. Freeze protect well, RDMO Post Rig: 1. V: Tree work as necessary. 2. S: Drift. LTP if necessary.* 3. F: Pressure test Liner top packer. AOGCC MITxIA *Approved alternate plug placement per 20 AAC 25.112(i) Ryan Ciolkosz CTD Engineer 564-5977 CC: Well File Joe Lastufka TREE= . FMC GEN • WELLHEAD= FMC SA TY NOTES:H2S READINGS AVERAGE 125 ACTUATOR= AXELSON 09-18 9-18 ppm WHEN WHENON ML WELL REQUIRES A SSSV OKB.ELEV= 54' BF ELEV= ? Ii KOP= 4001' Max Angle=- 20°@ 6232' 1 2148'-7--7"CAM BAL-O SSSV NP,D=5.937" Datum MD= 9094' Q Datum TVD= 8800'SS 13-3/8"CSG,72#,MN-80,D=12.347" H 2713' -41 Minimum ID = 3.725" @ 8706' 4-112" OTIS XN NIPPLE 7"TBG,26#,L-80,.0383 bpf,D=6.276" H 8603' \ / 8603' 1 17"X 4-1/2'XO,D=3.958" .>< }` 8606' H9-5/8"X 4-1/2'BAKER MODEL D FCR TOP OF 7"LN2 -f 8638' — E ' , 8706' -14-1/2"OTIS XN NP,D=3.725" A"°i'r" t 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" - 8718' 8717' -14-12"BAKER SHEAROUT SUB \ / \ 8718' 4-12"WLEG,D=3.958" PERFORATION SUMMARY REF LOG BHCS ON 11/16/77 8702' HELM)TT LOGGED 06/13/91 ANGLE AT TOP PERF: 14°@ 8935' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 3-3/8" 18 8935-8950 S , 12/08/95 11/28/13 3-1/8" 4 8982-9002 S 04/06/84 11/28/13 2-12" 5 9015-9055 S 05/26/03 01/02/14 3-1/8" 4 9020--9038 S 06/01/91 01/02/14 3-3/8" 4 9050-9060 S 05/26/03 01/02/14 S 9093' -19-5/8'X 7'BAKER ECL A<R 3-3/8" 6 9070-9101 S 11/24/91 01/02/14 3-1/8" 4 9126-9142 S 02/16/78 01/02/14 3-1/8" 4 9170-9177 S 02/16/78 01/02/14 E 9146' -L9-5/8"X 7"BAKER EGL FKR 3-1/8" 4 9186-9190 S 02/16/78 01/02/14 3-1/8" 4 9209-9218 S 09/02/85 01/02/14 3-1/8" 4 9228-9241 S 09/02/85 01/02/14 3-1/8" 4 9259-9267 S 09/02/85 01/02/14 3-3/8" 4 9276-9290 S 06/13/91 01/02/14 3-3/8" 6 9290-9292 S 06/01/91 01/02/14 rA LM.29#,L-80,.0371 bpf,ID=6.184" -r 9353' 935T--7-1-7"BAKER V SET SHOE] 4••1/•11•91V '111/ 9371' H PBTD 1111111111 9-5/8"CSG,47#,N-80,.0733 bpf,D=8.681" - 9432' 111111111111111111111 .•1/1111111111111111111 TD - 945d' 1.1.1.1.1.1.1. 1.1. DATE REV BY COI/NEWS DATE REV BY C OMuENTS PRUDHOE BAY UNIT 12/01/77 ORIGINAL COMPLETION 05/30/06 DTM WELLHEAD CORRECTIONS WELL 09-18 — 06/01/91 _LAST WORKOVER 02/04/14 ALMJMDCOIL RESQUEEZEPERES(01/01/14 PERMTNo:n1770390 12/21/00 SIS-SLT CONVERTED TO CANVAS AR No: 50-029-20259-00 01/10/01 SIS-LG REVISION SEC 1,T10N,R15E,642"FSL&223'FWL 09/26/01 RN/TP CORRECTIONS 05/26/03 BJANTLP ADD PERF BP Exploration(Alaska) TREE= . FMC GEN • VVELLHEAD= FMC SAFt I Y NOTES:H2S READINGS AVERAGE 125 ACTUATOR= A" S°' 09-18A Proposed ppm WHEN ON ML WELL REQUIRES A SSSV WHEN ON MI. ........... BF.ELEV= ? L KOP= 4001' Max Angie= 20°@ 6232' 2148' I—7"CAM BAL-O SSSV I'1',D=5.937" Datum MD= 9094' PERFORA TION SUMMARY Datum TVD= 8800'SS REF LOG:BMCS ON 11/18/77 ANGLE AT TOP PERF:14'® 8935' Note::Rete,to Prodo<tpa 00 for historical pert data 13-3/8"CSG,72#,144-80,D=12-347• H 2713' SIZE SPF N T E R V AL Opa/Sqz SHOT SO2 3-3/8` 18 8935-8950 S 12/08/95 11/28/13 3-1/8" 4 8982-9002 S 04/06/84 11/28/13 2.1/2` 5 9015-9055 S 05/26/03 01/02/14 3-1/8` 4 9020-9038 S 08/01/91 01/02/14 Minimum ID =3.725" @ 8706' 1-3/8` 4 9050-9060 S °5`24/91 01/02/14 3-378` 6 9070-9101 S 11/24/91 01/02/14 3-118' 4 9126-9142 S 02/16/78 01/02/14 . 4-1/2" OTIS XN NIPPLE 3-1/8` 4 9170 •9177 S 02/16/78 01/02/14 3-1/8` 4 9186-6190 S 02/16/78 01/02/14 3-1/8' 4 9209 -9218 5 09/02/85 01/02/14 3-1/8' 4 9228-9241 5 09/02/85 01/02/14 3-118` 4 9259-9267 S 09/02/85 01/02/14 3-318' 4 9276 -9290 S 06/13/91 01/02/14 ....'''''''''''''• 3-3/8' 6 9290-9292 S_ 06J01J91 01/02/14 7"TBG,26#,L-80,.0383 bpf,D=6276" H 8603' / 8603' --17"X 4-1/2"XO,D=3.958" TOP OFT LNR — 8638' 8606' H9-5/8"X 4-1/2"BAKER MDDEL D FICR 3.70"BKR DEPLOY SLV,ID = 3.00"@ 8,650'MD M Et.outXN to 3.813"ID I 8706' H4-1/2"OTIS XN NP,D=3.725" 4-1/2'TBG,12.6#,L-80, .0152 bpf,D=3.958" — 8718' / 871T --14-1/2"BAKER SHEAROUT SLB \\` (\ 8718' —j4-1/2"WLEG,D=3.958" / 8702' H ELM)TT LOGGED 06/13/91 ll Pjv �y tt-1/2 93`#STL13CR-80 / U 3-1/2' 3-1/4"X0 @ -8872'MD -•'t a 4-1/2"x 7"BakerTT whipstock@ 8,972'MD 7"Posiset@ 9,000'M D 1.�4+, TD 0,313 MD - RA TAG @ TBD 3-1/4"13C r-80 Liners i'4is TD 9093' H9-5/8"X 7'BAKER ECL PKR m 9146' —19-5/8"X 7"BAKER ECL MR-1g A I• T LNR,29#,L-80,.0371 bpf,ID=6.184" —1 9353' _J--, ' L 9353' —7"BAKER V SET SHOE .M41/1/1141411���1 1 9371' —I PBTD ♦1•••••••41 9-5/8"CSG,47#,N-80,.0733 bpf,ID=8.681" 9432' ••••••••••• 0........... .0. TD — 9450' DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 12/01/77 ORIGINAL COMPLETION 05/30/06 DTM WELLHEAD CORRECTIONS WELL: 09-18 06/01/91 LAST VVORKOVER 02/04/14 ALMJMD COIL RESOtEEZE PERES(01/01/14 PERMT No:'1770390 12/21/00 SIS-SLT CON VEHIHJTO CANVAS AR Nb: 50-029-20259-00 01/10/01 SIS-LG REVISION SEC 1,T1ON,R15E,642"FSL&223 FWL 09/26/01 RN/TP CORRECTIONS — 05/26/03 BJM/TLP ADO PERF BP Exploration(Alaska) • • 1; 10E1 O g MIIII LL E b M 41 m o m '•, U f I 4) it, ' I 0 M o 2 1 - X m il ell �, s € e a e � o m —.0i I CV { C` go 0= 'EI 11111 I�•m f V i�va }{I VE 0 a C m a C O a 1 1 1 f Q N f V N v °m S 0 r .... I c .. ;.1 N �' I 110 I l O 1IIIi 11 il O >11 1 l ii i U ' 2 m a 41 _ /1 N Q 5 1 I o n col Iii, 1111 a III a C m 1 c "> L «� E o ,iil 0 t 1►��" ' v u E$ m 1 U 1 r ..> N' 1 iII :1s 1111 ',111 Jaa °eT. E wg I1 1 o� 1 re 1 ip 1�� I :1 u 0 J leWII ill — 1�1 N W rc a v O v LIJ . Iti r I . _ 4 I® i Y I ' m I ge0 /� e V a Ce E min in , ..., oi Q p..) m ■� II,_ N a4 f� J1! Q ' , „, I I il , .... E„ m ' w I.I. u 1 mo o r 0 m 10Ei Z 1 _ ) ; a° E I 6 E II e mN i ® il' IOI `.2 y gg ♦ I 1.5034171] 'i 0 Y - 1 - III = II0I-1111 , I ��II • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist, in the upper left corner of Form 10-403 is checked. If the"Abandon" or ✓` "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist / work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). f/ Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407,they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July,the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. �r • • 1 O aJ Q 0 X co (O Q L o a N 0 v s s c oo I- a ra n O O p O >- a < • p 7 ,n ,� ,n in u� @ m oo v s -1 D „fL V , u '-' 4-' 1./1 N Q f.; W Y I W _ C7 al O A 7 w V) ✓, L C C t Orm NZJQ - N V - ' -. c rOa a) > z ,-- 0 ° o 0°- y '0 L ru L 6 0 0 0 0 0 0 0 C 0 O n w w w w W w w OA I- L.L. LL LL LL LL LL LL 0 Q1 E -0 0 O a J J J J J J J d O v G". 0) (C Z Z Z Z Z Z Z a) Lel v u O ph LL LL LL LL LL LL LL LU ,_ - L a) O v m a) 0ci w o `o O z0 z C 0 _0 E o 0 11.1 Q1 a F- G O CC a m Q C s 0 > b �. U Cl z N V1 a LL 0 21- it .4Q � mmw � Wa V G ..r m Q co i— a !n N d V > ~ W \ a fV td w CL CU C a a W p 0 0 \0 $ 0i c41 _ 0 i CL o. 0 0 0 J O J J S ri z R M cc w w �' w 3 3 I IT 2 2 2 2 �� 0 w ip a a a a a a a to 5 m CO m m m m m cu 20000000 E 0 2 2 2 2 2 2 2 L -J 0 0 0 0 0 0 0 v u w_ LL a' a' Q: Q: 2 2 re "1-' N a. a a. a a a. a , .'� .� >. .� A a CV / W CO p1 C) N M M Ce X til O anlin In W ,-4 (DCJ ••‘- � 0 0 0 0 0 0 0 . O O p 0 0 0 O (p C'.3 u c0 tD a' C� C� ce a) > v c� a W � 0 � 000 0 v) c co p o N o 0 0 u LO 0 0 0 0 0 CO 0 t^ N CA u") O CA O M r!. C U) CO C) N N Tr CO C ryl N N Co C) CO - V VI i ry E.: N N N N N N N L n w..:...:-.. T 0) 0) 01 O) CA 0) O p N N N N N N N 01 0 0 0 0 0 0 O0 0 0 0 0 0 O r N N N N N fit) N 0 G u L Z E1/1 re u >� arGo u he 8 z c`a'i a n M v u a; a amo N . p J c ., +,n mm Zd) `� pz � ._ 03 �as � N � poU_ QQ x E za, co�' c _ mh- a` a bp RECEIVED 0 AUG 21 2014 Avli\sL' BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA LOG DATA) Date 21 -Aug -2014 Transmittal Number: 93373 If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents SCANNED 1 CD-ROM Containing OPEN HOLE Digital Log Data: 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, 06-04A, 09-011, 09-02, 09-03, 09-04, 09 -05f'09 -08r 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-111 B-241 B-25, C-10, L2 -07A, 0-02, M-04, M-05, U-14 The information on this CD is to be used for BP Exploration (Alaska) Inc. business only. If you are not the owner or licensed user of this CD, any disclosure, copying or use of the information on this CD is prohibited. If you obtain this Angela K. S CD by error, please return the CD to the address shown below. BP will pay the postage. Thank you. Please Sign and gancpdc@bp.com Doug Dortch Petrotechnical If found please return CD to: BP Exploration PO Box 196612 Anchorage, AK 99519-6612 by 0 :or External Distribution Attn: State of Alaska. `\ CD 1 of 1 Attn: Makana Bender BPXA OH Log Data 333 W. 7th Ave, Suite 1 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, Anchorage, Alaska 99501 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18,09-19,09-20, 14-26, 16-07, A-03, B-11, B-24, B-25, C-10, L2 -07A, 1-3-02, M-04, M-05, U-14 18 -AUG -2014 Petrotechnical Data-Ce-nier R2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 177-077 183-101 171-005 176-030 176-042 185-301 175-073 175-062 200-102 175-076 176-016 176-035 176-040 176-047 176-070 176-076 176-082 176-084 177-007 177-008 177-025 177-036 177-037 177-038 177-039 177-040 177-041 181-110 185-204 171-038 178-069 182-140 182-151 179-035 204-053 186-154 171-023 176-110 193-100 RECEIVED STATE OF ALASKA JAN 2 7 2014 AL ,CA OIL AND GAS CONSERVATION COMM, ,ON REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations Perforate U Other LJ Cement Squeeze Performed: Alter Casing ❑ Pull Tubin Stimulate-Frac ❑ Waiver ❑ Time Extension❑ ,r Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑ 6X-AytU c SCQ(,, 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Exploratory ❑ p 177-039-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service Q 6.API Number: Anchorage,AK 99519-6612 .w 50-029-20259-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028327 b T PBU 09-18 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured • 9450 feet Plugs measured None feet true vertical 9199.16 feet Junk measured None feet Effective Depth measured 9371 feet Packer measured See Attachment feet true vertical 9122.5 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 83 20"94#H-40 28-111 28-111 1530 520 Surface 2685 13-3/8"72#MN-80 28-2713 28-2712.98 5380 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner 715 7"29#L-80 8638-9353 8411.45-9105.04 8160 7020 Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet SEWED MAY 2 12x14 Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: RBDMe4MAY 17 2014 Intervals treated(measured): 8935'-9292' Treatment descriptions including volumes used and final pressure: ' 210 BBL ORGANO SEAL,245 BBL POWERVIS,50 BBL LARC CEMENT, 11 BBL N2 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 1055 0 0 Subsequent to operation: 0 0 2902 0 0 14.Attachments: 15.Well Class after work: ft Copies of Logs and Surveys Run Exploratory❑ Development❑ Service❑✓ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: ft Oil Li Gas ❑ WDSPLU GSTOR ❑ Q WAG 2 GINJ ❑ SUSP ❑ SPLUC] 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerhaysabp.com Printed Name Nita Summerhays Title Data Coordinator _jrifI Signatur Phone 564-4035 Date 1/27/2014 Ci#2;"" _f?. / Form 10-404 Revised 10/2012 /{'/'„/� Submit Original Only Daily Report of Well Operations ADL0028327 ACTIVITYDATE SUMMARY emp= , •ssis 'ump rew •rgano-sea rea men po uni ans rig up o ' • 11/28/2013 Job continued on 11-29-13 WSR 11/28/2013 *** Fullbore OrganoSEAL Treatment*** *** Fullbore OrganoSEAL Treatment*** LRS and SLB MIRU on 09-18. Job continued 11/28/2013 29Nov2013 Job continued from 11-28-13 WSR T/I/O 216/322/67 Temp=Sl Assist SLB pump truck (organoseal) Pump 20 bbls neat meth to establish a LLR of 1 bpm at 1620 psi. Pumped a total of 10 bbls 60/40 spacer down tubing followed by a total of 317 bbls diesel for freeze protect and to spot , Organoseal treatment into formation. SLB pump crew has well control. FW H P's=1600/38/86. 11/29/2013 167 bbls diesel from CH2 tanker#39017 ***Fullbore OrganoSEAL Treatment Continued from 28Nov2013***T/I/0=216/82/64, MIRU SLB and LRS. Mix and pump OrganoSEAL treatment for previously squeezed perfs at-9050'. Loaded well with 513 bbls of 1% KCL at 0.9-6 bpm; Pumped 210 bbls of OrganoSEAL at 5 bpm psi, displaced with 10 bbls fresh water, 5 bbls 60/40 meth and 317 bbls of diesel. Sent samples of OrganoSEAL to SLB lab for observation. Final T/I/O = 11/29/2013 1599/75/90. SV, WV, SSV= C. MV= 0. IA, OA, = OTG. T/I/0=286/337/51 Temp=Sl MIT-T to 1500 psi***PASSED*** (Post Organoseal) Pumped 3 bbls of Diesel down tubing to establish MIT-T test pressure of 1500 psi. 1st 15 min tubing lost 108 psi. 2nd 15 min tubing lost 41 psi for a total loss of 149 psi in a 30 min test. Passed. Bled back -2.1 bbls. SV,SSV,WV=C MV=O IA,OA=OTG 12/2/2013 FWHP=285/337/49 ***WELL S/I ON ARRIVAL***(cement squeeze) RAN 3.25" CENT, TEL, SAMPLE BAILER, SD @8369' SLM, PULL HEAVY TO 8320' SLM (very sticky, sample of organo-seal in 7"TBG) 12/8/2013 ***WELL SI/ON DEPARTURE***(pad op notified) CTU#3 1.75" CT(CTV=32.9 bbls) Job Objective: Post OrgSeal Cleanout/Cmt Sqz MIRU. 12/27/2013 ***Job Continued on 12/28/13*** CTU#3 1.75" CT (CTV=32.9 bbls) Job Objective: Post OrgSeal Cleanout/Cmt Sq_z Ran 2.50" DJSN &cleaned out OrganoSeal from 8300'to 9342' CTM. Tagged TD at 9342'(down)/9338' (up). Target depth = 9340'. Chase ooh at 80%. Returns were 1:1 during cleanout. Perform Injectivity Test: 3.7 bpm @ 1023 psi. Will proceed with cement squeeze. After consulting with Anchorage Interventions Engineer, decide to circulate in diesel to provide hydrostatic underbalance for cement job. RIH to 6500' and begin laying in diesel. At 4808', coil got stuck. Worked free, but pulling heavy; stuck again at 4736'. Suspect ice plug in lubricator. Swap from diesel to warm Slick 1% KCL down coil. After pumping 30 bbl of warm fluid, coil came free. Recommence POOH. At 4664', observed necked/collapsed coil at reel. Park coil, reduce pump to minimum rate, and stand by. 12/28/2013 ***Continue job on 12/29/13 WSR*** Daily Report of Well Operations ADL0028327 CTU#3 1.75" CT (CTV=32.9 bbls) Job Objective: Post OrgSeal Cleanout/Cmt Sqz Continued from 12/28/13. Pumping at minimum rate at 4664' due to necked/collapsed coil at reel. Pump until have diesel at surface; well is freeze protected with 89 bbl of diesel (2300'). Freeze protect coil with 60/40 meth. POOH with damaged coil. Blow down reel w/N2. Depart to shop for reel repair. 12/29/2013 ***Job Incomplete, will return after reel repair*** CTU#3 1.75 Coil (CTV= 32.5 bbls) Job Objective: Cmt Sqz. MIRU from SLB yard following coil weld repair. Drift coil w/ 1.25" ball. MU Cement Nozzle. RIH to 7110'. Circulate in diesel for underbalance for cement squeeze. 12/30/2013 ***Job Continued on 12/31/13 WSR"** CTU#3 1.75 Coil (CTV= 32.5 bbls) Job Objective: Cmt Sqz. Finish circulating in 235 bbl diesel for underbalance for cement squeeze. Follow with 30 bbl of 60/40. 265 bbl total pumped; circulated 14 bbl of 60/40 to surface. Close choke. RIH and tag TD @ 9328'. Paint red/white coil flag @ 9318'. WHP had built to 1200 psi while RIH with closed choke. Attempt to bleed off WHP to 500 psi prior to pumping cement; open choke and WHP didn't bleed off. Attempt to pump down backside; pressured up quickly. Able to move pipe and pump down coil into formation, and can bleed off coil through choke directly out to open top tanks. Downcomer is frozen. Tarp and heat downcomer and attempt to thaw. At 06:20am, make decision to dump cement. Ice plug broke free at 06:40am. RIH to 7000'while pumping 18 bbl 60/40 down backside, then swap to coil &freeze protect coil. Pooh and standby for next batch of cement. 12/31/2013 ***Continue Job on 1/1/14*** CTU#3 1.75 Coil (CTV= 32.5 bbls) Job Objective: Cmt Sqz. Ran 2.50" BDJSN to flag at 9318' ctm. Pump 102 bbls KCL + 50bbls FW to warm wellbore fluids to prevent freeze up at surface. Layed in 15.8ppg LARC cement. Getting 1:1 returns. Above perfs shut in choke& bumped up mint squeeze 500psi over whp. La1ed in remaining_cement maintaining 500psi over whp bump. 20.3 bbls behind pipe. WCTOC at 8463'. PUH to safety at 8000'. Consult w/APE. Perform hesitation squeeze to 1500psi. Squeezed an additional 5.2 bbl behind pipe (25.5 bbl total behind pipe). Calculated TOC before cleanout= 8600'. Launch 3/4" ball with 11 bbl KCL spacer, then swap to PowerVis. Contaminate cement from 8000' down to flag. Made 3 passes: down, up, down. Pumped 125 total bbl of PowerVis for contamination. Chase out at 80%, making double passes across jewelry. 1/1/2014 ***Continued on 1/2/14*** CTU#3 1.75 Coil (CTV=32.5 bbls) Job Objective: Cmt Sqz. Continued from 1/1/14. Finish chasing contaminated cement to surface. Jet BOPE and tree. Run back in hole and lay in 60/40 methanol freeze protect from 2500'. Rig down. Stand by for wind (per unit's Overload Permit, wind speed must be less than 20 mph to cross Sag River bridge). 1/2/2014 ***Job Complete*** FLUIDS PUMPED BBLS 40 METH 673.4 60/40 METH 1121 DIESEL 3157 1% KCL 233 FRESH WATER Daily Report of Well Operations ADL0028327 210 ORGANO SEAL 245 POWERVIS 50 LARC CEMENT = 11 N2 5740.4 TOTAL N l0 CONr ONWMCOM .- O t•- mr0CD 'cr L F ,TO) M O CO N- O M N COO C�) O O) co p O) O) 0 0 0 0 4 (O ' (O M O N 0 "- OM ) - - NCOM NtNO) N � � O N- ON- N- N- 000OO W OO OO) O) O O)OO CO CO CO CO CO COCO CO00 CO CO CO CO CO 0) 0) 0 W a 0 I- OCONCOMCOMN- N- O) N N O W w W w — 00O) MOCo � N � 0) CO CO M (q Z fY N O M M O M 0 O) N- CO CD (41 � CL) COF M � D J D 0d 0 MN CO N- N- I- I,- I CO CO 00 CO O) O) O) O) O O OJ 0 J O CO CO CO CO CO CO o0 CO COOCo CO CDCOrn 0) m a W a 01-. 0 O Q co 0) 0) m N W +t,,• O O (N O 00 O O O F N N. O CO F N- O N a O O N M O O CO O O) r CO O) O) C N O) O) 000000 T- r- CV NN NN O CO CO O) O) 0) O) O) O) O) O) O) O) O) 0) O) O) co 41.1 0d f U) re V w (1) 0) U N UM app. C O r OONOOCOOOOCO0 000) CO0) coo J a M A CO F N M O ON- N I- COON O • G °f 0) 0) 0) 000000 F FNNN NN Q CO CO CO O) O) O) O) O) 0) O) O) 0) 0) O) 0) 0) O) a, IVCv O 2 t 0 0 0 N N N N N N N N N N N N N N N NN E 00000000000 000000 awwwwwwwwwww CCCC C) � 0 d a 0 t• F F F v v v v v v v v v v v v v v Q O 0 o . . . . . . . . r r r r r r W C N N N 0 0 0 0 0 0 0 0 O O O O O O ON N N N N N N N N N N N NNWW = O CO W . . . . . . . . N N LL N N N N N N N N N N N N N N N NNWW IJ LL w O '_ '_ '_ 00w W (n 0) a Ir m E m Z Co O Co CO O Co CO Co CO CO W CO O Co Co CO O . . . . . . . . . . r r r r r F F m 0) 0) O) O) O) 0) O) O) 0) 0) 0) 6666 O) O) 0 0 w O O 0000000000 0000 OO Cl) (n 0.. CC w fl,o 0 0 0 0 0 0 0 0 0 o O ( N N OO CO 00 CO CC) (O O O — O O N- O N- Od' to I� to d d to N to 1- 0 LMCOtooNN- ttoN- ttoNN- ttoU) C) 7t1 - - 00 - 00 - 00 — MNd' m , 00000DCOOCOOD toN- 00 d O O) 00 CO to 0) 0) OO N CO OOOO) N- O) N- 000) COOD ‘- $01sNOd' d- OOA- N- OD M d' to O CO CO — N- M V 0) N N N f- 0o Co 0) N C C 00) 00) 00)) tNDO) N co N N N- N O v v Co N N N Co N N N NN- CO O Co 4.0 M OD r- i- V M N M M O T- tof� N0000NM %- Ov- 1- C) C to NOO) d' N- CON .0 %- 0) NNNf- o000) NCCo N M co W CD M CD Co O O 000 N CJD OD O ON NOOONNNNNOCCNNO CO C Q N O) O to 0 � O � OO) OO T W Q 1 T aoo O Z O Z Z 2 w '1 = co NNNd' d• r„ d' r, N 19 O) O d O 0) 4 0) 0)L om a+ O M tI) to M O 0 OD 0) O 00 N- (O CW M d' OD N. CO M O CO M T- 0 N V InNCnv- Z Z Z Z Z Z Z E- 0000000 0 00000000 U > » » » > Q00 0 000O000IiZZ zw0000000Xmm Ozwxxxxxx » U =immmmmma () F- F- Packers and SSV's Attachment ADL0028327 SW Name Type MD _ ND Depscription 09-18 PACKER 8606 8326.52 4-1/2" Baker Model D Packer 09-18 PACKER 9146 8850.18 _7" Baker ECL Packer 09-18 PACKER 9194 8896.75 7" Baker ECL Packer TREE= FMC GEN SA l NOTES:H2S READINGS AVERAGE 125 WELLHEAD= FMC ACTUATOR= AXELSON 09-18 Wy N ON N MI.WELL REQUIRES A SSSV KB. ELEV= 54' BF. ELEV= ? KOP= 4001' 2148' —7"CAM BAL-O SSSV NIP, ID=5.937" Max Angle= 207 @ 6232' I—CT Datum MD= 9094' Datum TVD= 8800'SS 13-3/8"CSG,72#,MN-80,ID=12.347" H 2713' Al ' Minimum ID = 3.726" @ 8706' 4.1/2" OTIS XN NIPPLE 7"TBG,26#,L-80, .0383 bpf,ID=6.276" — 8603' / 8603' —17"X 4112 XO, ID=3.958" >< C -7 8606' —19-5/8"X 4-1/2"BAKER MODEL D PKR TOP OF 7"LNR H 8638' I1 8706' —14-1/2"OTIS XN NIP, ID=3.725" 4-1/2'TBG, 12 6#, L-80, 0152 bpf, ID=3.958" I 8718' 8717' H4-1/2"BAKER SHEAROUT SUB [ 8718' —14-1/2"WLEG,ID=3.958" PERFORATION SUMMARY REF LOG: BHCS ON 11/16/77 8702' H ELM)TT LOGGED 06/13/91 ANGLE AT TOP PERF. 14°@ 8935' Note Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE 3-3/8" 18 8935-8950 S 02/13/12 3-1/8" 4 8982-9002 S 06/01/91 2-1/2' 5 9015-9055 S 02/13/12 3-1/8" 4 9020-9038 S 06/01/91 3-3/8" 4 9050-9060 S 02/13/12 g 9093' —19-5/8"X 7"BAKER ECL PKR 3-3/8" 6 9070-9101 S 02/13/12 3-1/8" 4 9126-9142 S 06/01/91 3-1/8" 4 9170-9177 S 06/01/91 S 9146' —9-5/8"X 7'BAKER ECL PKR 3-1/8" 4 9186-9190 S 06/01/91 3-1/8" 4 9209-9218 S 06/01/91 3-1/8" 4 9228-9241 S 06/01/91 3-1/8" 4 9259-9267 S 02/13/12 3-3/8" 4 9276-9290 S 02/13/12 3-3/8" 6 9290-9292 S 06/01/91 7"LW,29#, L-80, 0371 bpf,ID=6.184" —I 9353' —, 9353' —17"BAKER V SET SHOE •0•••••-tirtrillf 9371' — D IPBT 44.44. 1111111111 9-5/8"CSG,47#, N-80, 0733 bpf, ID=8.681" H 9432' 1111111111 .11111111111111111111 TD —{ 9450' 1N1•1•1•1•1•1•1•41 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/01[77 ORIGINAL COMPLETION 05/30/06 DTM WELLHEAD CORRECTIONS WELL: 09-18 06/01/91 LAST WORKOVER 02/11/11 MB/JMD ADDED SSSV SAFETY NOTE PERMIT No:'1770390 12/21/00 SIS-SLT CONVERTEDTO CANVAS 02/27/11 KUPJC DRAWING CORRECTION AR No 50-029-20259-00 01/10/01 SIS-LG REVISION 01/11/12 TMN/JMD ADDED H2S SAFETY NOTE SEC 1, T10N, R15E,642"FSL&223'FWL 09/26/01 RN/TP CORRECTIONS 02/16/12 RMWJMD SQUFF7ED PERFS(02/13/12) 05/26/03 BJMITLP ADD PERF BP Exploration(Alaska) •STATE OF ALASKA RECEIVED z IRSKA OIL AND GAS CONSERVATION COMMISSION JUL 1 6 2013 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations U Perforate Li Other U Cement Squeeze Performed: Alter Casing ❑ Pull TubingO Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Weil❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Developments Exploratory ❑ 177-039-0 3.Address: P.O.Box 196612 Stratigraphic Service 5 6.API Number: Anchorage,AK 99519-6612 50-029-20259-00-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028327 PBU 09-18 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): '10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL' 11.Present Well Condition Summary: Total Depth measured 9450 feet ' Plugs measured None feet true vertical 9199.16 feet Junk measured None feet Effective Depth measured 9371 feet Packer measured See Attachment feet true vertical 9122.5 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 83 20"94#H-40 28-111 28-111 1530 520 Surface 2685 13-3/8"72#MN-80 28-2713 28-2712.98 5380 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner 715 7"29#L-80 8638-9353 8411.45-9105.04 8160 7020 Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): NOV 0 3 2013 9095'-9292' SCANNED Treatment descriptions including volumes used and final pressure: 514 BBL 1%KCL,220 BBL ORGANOSEAL 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 4746 11736 0 0 1149 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run ExploratorLj Development❑ Service 5' Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas Li WDSPLU GSTOR ❑ WINJ 5 WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays& BP.com Printed Name Nita Summerhay- Title Petrotechnical Data Technician AlpArRilffillr Si.•- . LrA,a���2 //r/// Phone 564-4035 Date 7/16/2013 7*? 'ivil ) 19 V V 1(/' R13r MS JUL 2 3 7O& Form 10-404 Revised 10/2012 Submit Original Only • • Daily Report of Well Operations ADL0028327 ***WELL S/I ON ARRIVAL*** (cement squeeze) DRIFT TBG W/3.50" CENT, 2.50"TEL, S. BAILER LOC TT © 8694' SLM/8702' ELMD (+8' correction), TAGGED TD @ 9252' SLM RAN SLB SBHPG PER PROGRAM 5/20/2013 ***WELL S/I ON DEPARTURE*** 1"/1/0 =Vac/50/60. Temp = ST. T& IA FL re-Gel 1 reatment). No AL Tn]ector. Integral installed on IA=inspection not current. T FL @ -1140' (43 bbl). IA FL @ -132' (3.5 bbl). 5/20/2013 SV, WV= C. SSV, MV= 0. IA, OA= OTG. NOVP. 0900 T/I/O=Vac/50/35, Temp=SI MIT-IA PASSED to 2000 psi (Gel Treatment) Pumped 6 bbls meth down IA to reach 2000 psi. MIT-IA lost 46 psi in 1st 15 minutes and 23 psi in 2nd 15 minutes for a total loss of 69 psi in a 30 minute test. Bled IAP. DSO notified 6/12/2013 of well condition upon departure. FWHP's=Vac/400/40. ***Continued from 6/14/2013*** Initial T/I/O = 27/297/40. Mix and pump OrganoSEAL treatment on previously squeezed perfs at-9050'. Loaded well with 514 bbls of 1% KCL at 3-5 bpm Pumped 220 bbls of OrganoSEAL at 5 bpm 1050 psi, displaced with 288 bbls of diesel, 29 bbls of 60/40. sent 2 samples of OrganoSEAL to SLB lab for 6/15/2013 observation. Final T/I/O = 1414/532/60. SV, WV, SSV= C. MV= 0. IA, OA, = OTG. T/I/0=170/330/0, Temp=S/I, MIT-T FAILED to 2000 psi, LLR of 2.75 BPM © 1800 psi (Post Gel Treatment) . Pumped a total of 24 bbls of diesel down tubing to attempt MIT-T to 2000 psi. Established a LLR of 2.75 BPM @ 1800 psi. SV,WV,SSV=Closed/ 6/17/2013 MV,IA,OA=Open. FWHP's=270/350/0. FLUIDS PUMPED BBLS 315 DIESEL 6 METH 514 1% KCL 220 ORGANOSEAL 50 60/40 METH 1105 TOTAL Perforation Attachment ADL0028327 SW Name Operation Date Pere Operation Code Meas Depth Top Meas Depth Base TVD Depth Top r TVD Depth Base 09-18 6/15/2013 SQZ 8935 8945 8699.44 8709.14 09-18 6/15/2013 SQZ 8945 8950 8709.14 8714 09-18 6/15/2013 SQZ 8982 9002 8745.05 8764.45 09-18 6/15/2013 SQZ 9015 9020 8777.06 8781.92 09-18 6/15/2013 SQZ 9020 9038 8781.92 8799.38 09-18 6/15/2013 SQZ 9038 9050 8799.38 8811.03 09-18 6/15/2013 SQZ 9050 9055 8811.03 8815.88 • 09-18 6/15/2013 SQZ 9055 9060 8815.88 8820.73 09-18 6/15/2013 SQZ 9070 9101 8830.43 8860.51 09-18 6/15/2013 SQZ 9126 9142 8884.77 8900.3 09-18 6/15/2013 SQZ 9170 9177 8927.47 8934.26 09-18 6/15/2013 SQZ 9186 9190 8942.99 8946.87 09-18 6/15/2013 SQZ 9209 9218 8965.31 8974.04 09-18 6/15/2013 SQZ 9228 9241 8983.74 8996.36 09-18 6/15/2013 SQZ 9259 9267 9013.82 9021.59 09-18 6/15/2013 SQZ 9276 9290 9030.32 9043.9 09-18 6/15/2013 SQZ 9290 9292 9043.9 9045.84 SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF • I 1 Casing / Tubing Attachment ADL0028327 Casing Length Size MD TVD Burst I Collapse CONDUCTOR 83 20" 94# H-40 28 - 111 28 - 111 1530 520 LINER 715 7"29# L-80 8638 - 9353 8411.45 - 9105.04 8160 7020 PRODUCTION 2350 9-5/8"47#S00-95 28 - 2378 28 - 2377.99 8150 5080 PRODUCTION 43 9-5/8"47# N-80 2378 - 2421 2377.99 - 2420.99 6870 4760 PRODUCTION 80 9-5/8"47#S00-95 2421 - 2501 2420.99 - 2500.98 8150 5080 PRODUCTION 4700 9-5/8"47# N-80 2501 - 7201 2500.98 - 7044.76 6870 4760 • PRODUCTION 1683 9-5/8"47#SM-95 7201 - 8884 7044.76 - 8649.95 8150 5080 PRODUCTION 39 9-5/8"47# N-80 8884 - 8923 8649.95 - 8687.79 6870 4760 PRODUCTION 509 9-5/8"47#SM-95 8923 - 9432 8687.79 - 9181.69 8150 5080 SURFACE 2685 13-3/8" 72# MN-80 28 - 2713 28 - 2712.98 5380 2670 TUBING 8575 7"26# L-80 28 - 8603 28 - 8377.62 7240 5410 TUBING 116 4-1/2" 12.6# L-80 8603 - 8719 8377.62 - 8489.86 8430 7500 • • • Packers and SSV's Attachment ADL0028327 SW Name Type MD TVD Depscription 09-18 PACKER 8606 8326.52 4-1/2" Baker Model D Packer 09-18 PACKER 9146 8850.18 7" Baker ECL Packer 09-18 PACKER 9194 8896.75 7" Baker ECL Packer TREE= ' ` FMC GEN • SAFETY NOTES:H2S READINGS AVERAGE 125 WELLHEAD= FMC O ACTUATOR= AXELSON � ppm WHEN ON MI.WELL REQUIRES A SSSV __..AX WHEN ON MI. 'KB.ELEV= 54' BF.ELB/= KOP= 4001' i 2148' —IT CAM BAL-O SSSV MP,ID=5.937" Max Angle= 20°a 6232' 0 _z__atum MD 9094' Datum TVD= 8800'SS 13-318"CSG,72#,101-80,ID=12.347" 2713' Minimum ID =3.726" @ 8706' 4-1/2" OTIS XN NIPPLE 7"TBG,26#,L-80, .0383 bpf,ID=6.276" —j 8603' 8603' _j-j7"X 4117"XO, ID=3.958" 65K.-- 8606' 1-19-5/8"X 4-12"BAKER MODEL D PKR TOP OF 7"LNR H 8638' g. I l 8706' —4-12"OTIS XN NIP,ID=3.725" 4112"TBG,12.6#, L-80, .0152 bpf,10=3.958 —I 8718' _ 8717' --4112"BAKER SIiF.AROUr SUB / ( 8718' H4-12"WLEG,ID=3.958" j PERFORATION SUMMARY REF LOG:BHCS ON 11/16/77 8702' --I ELM)TT LOGGED 06/13/91 ANGLE AT TOP PERF; 14° l',8935' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 18 8935-8950 S 02/13/12 3-1/8" 4 8982-9002 S 06/01/91 2-1/7 5 9015-9055 S 02/13/12 3-1/8" 4 9020-9038 S C6/01/91 3-3/8" 4 9050-9060 S 02/13/12 $ 9093' -9-518"X 7"BAKER ECL PKR 3-318" 6 9070-9101 S 02/13/12 3-1/8" 4 9126-9142 S 06/01/91 3-1/8" 4 9170-9177 S 06/01/91 g 9146' H9-5/8"X 7"BAKER ECL PKR 3-1/8" 4 9186-9190 S 06/01/91 3-1/8" 4 9209-9218 S 06101/91 3-1/8" 4 9228-9241 S 06/01/91 3-1/8" 4 9259-9267 S 02/13/12 3-3/8" 4 9276-9290 S 02/13/12 3-318" 6 9290-9292 S 06/01/91 7'LNR,29#,L-80,.0371 bpf,ID=6.184" H 9353' _J—, 9353' H7"BAKER V SET SHOE •••f•9�••••••••• 9371' H PBT 9-518"CSG,47#, N-80,.0733 bpf,ID=8.681" —I 9432' •4•••4••4•4•4••4•••441 TD —I 9450' ..............+.0.4, DATE REV BY CONMAENTS DATE REV BY CONNTS PRUDHOE BAY UNIT 12/01/77 ORIGINAL COMPLETION 05/30/06 DTM WELLHEAD CORRECTIONS WELL 09-18 06101/91 LAST WORKOVER 02/11/11 MB/JMD ADDED SSSV SAFETY NOTE PERMT No '1770390 12/21/00 SIS-SLT CONVERTED TO CANVAS 02/27/11 KUPJC DRAWING CORRECTION API No: 50-029-20259-00 01/10/01 SIS-LG REVISION 01/11/12 TM JJJMO ADDED H2S SAFETY NOTE SEC 1,T1ON,R15E,642"FSL&223'FWL 09/26/01 RNVTP CORRECTIONS 02/16/12 RMWJMD SQUFF7ED PERFS(02/13/12) 05/26/03 BJMYTLP ADD PERF BP Exploration(Alaska) Wallace, Chris D (DOA From: AK, D&C Well Integrity Coordinator[AKDCWellintegrityCoordinator@bp.com] Sent: Sunday, June 02, 2013 4:10 PM To: Regg, James B (DOA); Wallace, Chris D (DOA); AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 DS Operators; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; Igbokwe, Chidiebere; AK, OPS EOC Specialists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr Cc: AK, D&C Well Integrity Coordinator; Weiss, Troy D; AK, D&C Projects Well Integrity Engineer; Arend, Jon Subject: NOT OPERABLE: Injector 09-18 (PTD #1770390) Well Due for Regulatory Compliance Testing All, Injector 09-18 (PTD #1770390) is due for a four year AOGCC regulatory compliance pressure test on 06/28/2013. The well is waiting on well work to be performed for pattern conformance will not be placed on injection before this date. The well is reclassified as Not Operable and will be placed on the Quarterly Not Operable Injection Report. Please call with any questions. Thank you, Jack Disbrow <;tterncte Liaorie Cin;cr BP Alaska - Well Integrity Coordinator Global Wells GW Urganizatior: Office: 907.659.5102 WIC Email: AKDCWelllntegrityCoordinator@bp.com SQNM OCT 0 J 2014 DATE: 27 -Jul -12 Stephanie Pacillo TRANS#: 6020 Data Delivery Services Technician Schlumberger Diifieid Services WIRELINE 2525 Gambell St, Ste. 400 Anchorage, AK 99503 2: Office: (907) 273-1770 NAME ORDER # DIST DIST DIST DIST �MakanaK Bender �•.` Natural Resources Technician II Alaska Oil & Gas Conservation Commission t 333 ;"'1. '*- nve, S-:ite 100 Andlorage, F -Y, 99301 LOGGED PRINTS PRINTS GNI-03 0600-00012 X MEMORY TEMP PRESS SURVE 13 -Jun -12 1 1 CD GNI-04 COT4-00019 X MEMORY TEMP PRESS SURVE 19 -Jun -12 1 1 CD MPL-12 BAUJ-00133 X MEMORY LEAK DETECTION LC 8 -Jun -12 1 1 CD Z -06A C2JC-00021 X SCMT 7" 31 -May -12 1 1 CD 14-33A C5XI-00006 X MEMORY DEPTH DETERMINAT 12 -Jun -12 1 1 CD Z -06A C2JC-00021 X SCMT 4.5 31 -May -12 1 1 CD 02-35B C5XI-00008 X MEMORY PPROF W/ GHOST 18 -Jun -12 1 1 1 CD L-04 C5XI-00005 X MEMORY IPROF 10 -Jun -12 1 1 CD V-207 C600-00013 X MEMORY PPROF 15 -Jun -12 1 1 CD J-26 BZ81-00019 X RST WFL LOG 9 -Jun -12 1 1 CD MPB-15 C2JC-00028 X PPROF W DEFT 25 -Jun -12 1 1 CD MPG -14 CSXI-00007 X MEMORY LEAK DETECTION LO 15 -Jun -12 1 1 CD GNI-02A COT4-00035 X IMEMORY TEMP PRESS SURVE 7 -Jul -12 1 1 CD 09-18 C3NA-00021 X INJECTION PROFILE 14 -Jun -12 1 1 CD X Please return a signed copy to: BP PDC LR2-1 900 E Benson Blvd Anchorage AK 99508 Please return a signed copy to! DCS 2525 Gambell St, Suite 400 Anchorage AK 99503 20- DEC -2011 Seh�■e 5843 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD A 09 -18 BVYC -00017 SLIM CEMENT MAP TOOL -039 26- Nov -11 1 1 MPS -01A BY05 -00003 ISOLATION SCANNER 25- Nov -11 1 1 F -05A BINC -00084 LEAK DETECTION LOG 19- Nov -11 1 1 P1 -03 BINC -00082 PPROF W/ DEFT & GHOST 17- Nov -11 1 1 17 -19A BJGT -00082 SBHPS 17- Nov -11 1 1 09 -12 BD88 -00183 MEMORY LDL 28- Nov -11 1 1 • C -02 BYS4 -00005 PRIMARY DEPTH CONTROL 16- Nov -11 1 1 04 -350 BYS4 -00006 USIT 16- Nov -11 1 1 GC -2E BYS4 -00011 RST WATERFLOW 6- Dec -11 1 1 15 -09A BINC -00085 PRIMARY DEPTH CONTROL 8- Dec -11 1 1 09 -17 BAUJ -00104 MEMORY INJECTION PROFILE 30- Nov -11 1 1 MPE -12 BD88 -00185 MEMORY INJECTION PROFILE 14- Dec -11 1 1 16 -03 BG4H -00099 INJECTION PROFILE 28- Oct -11 1 1 MPL -24 BUTT -00004 MEMORY INJECTION PROFILE 6- Aug -11 1 1 2- 50/U -08 BD88 -00184 MEMORY IPROF W /DEFT GHOST 11- Dec -11 1 1 A -11 BSM4 -00018 INJECTION PROFILE 30- Oct -11 1 1 • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 - 1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 °` NE )MAR 0 1 ZOi2. C~ MEMORANDUM TO: Jim Regg ~~~ ~~Z~~ ~ P.I. Supervisor FROM: Chuck Scheve Petroleum Inspector ~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, July O1, 2009 SUBJECT: Mechanical Integiry Tests BP EXPLORATION (ALASKA) INC 09-18 PRUDHOE BAY LTNIT 09-18 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~ Comm Wetl Name: PRUDHOE BAY iJNIT 09-18 Insp Num: mitCS090630090620 Rel Insp Num: API Well Number: 50-029-20259-00-00 Permit Number: 177-039-0 ~ Inspector Name: Chuck Scheve Inspection Date: 6/28/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well o9-is Type Inj. ~' TVD 83ai °~ IA 20o zsoo ~ za~o 2a~o P.T.D 1770390 TypeTest SPT Test psi z09525 QA 90 340 330 330 Interval 4YRTST P~F' P~ Tubing 970 970 970 970 Notes: . i, . ' , ~'? `~i "~1 ~ `' t1 ' f ~, ~ R-`~ ~ U L J Wednesday, July O1, 2009 Page 1 of 1 ) ") MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg ,0 ( P.I. Supervisor h~'l 77&(D<;' DATE: Wednesday, July 20,2005 SUBJECT: Mechanical Integrity Tests BP EXPLORA nON (ALASKA) INC 09-18 PRUDHOE BAY UNIT 09-18 I. '1:t:¡""c:@1i:;3Y" ""I""'" 'i FROM: Jeff Jones Petroleum Inspector Src: Inspector Reviewed B~ '-Tt'¡;1 P.I. Suprv--JPF- Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT 09-18 Insp Num: mitJJ0507I9I55724 Rei Insp Num: API Well Number: 50-029-20259-00-00 Permit Number: 177-039-0 Inspector Name: Jeff Jones Inspection Date: 7/18/2005 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 09- I 8 Type Inj. w TVD 8381 IA 160 2500 2460 2460 P.T. 1770390 TypeTest SPT Test psi 2095.25 OA 0 260 260 260 Interval 4YRTST P/F P Tubing 1500 1500 1500 1500 Notes: 3.2 BBLS methanol pumped. . .! !i\H\rE''''r' n1JG p Q ?01ì1 S(~;â'~~"! ~ ~ .",,;Jì Þ1 ~ )J ,i} '.' U >., Wednesday, July 20,2005 Page I of I rI (3) ) TREE = FMC G 8'J WELLHEA 0 = rv'CBI OY 'A'cfÜAröR;; , '" A XELS b'N "KS. 833/;'·"''' ." '5"4' ì3F': B...éT; ? .... ...................... ... KOP= 4001' . ............... . .....,,, ,.~~,:~.0.~ ~.: .,.",. ?g.l~L~?~,?,·. Datum rvÐ = 9094' "63fümTVO;' . ·....··ääõNS'§ 113-3/8" CSG. 72#, MN-80, 10 = 12.347" J-1 2713' r-J Minimum ID = 3.725" @ 8706' 4-1/2" OTIS XN NO-GO NIPPLE 09-18 IT' mG, 26#, L-80, .0383 bpf, 10 = 6.276" 1-4 I TOP OF 4-1/2" TBG 1-1 8603' 8603' \ :g TOP OF 7" LNR 1-4 8638' ~ 14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" 1-1 8718' ~ 8 17" LNR, 29#. L-80. .0371 bpf, 10 = 6.184" l-t 9353' ~ PffiFORA TION SUMMA. RY REF LOG: BHCS ON 11/16/77 ANGLEA TTOP ÆRF: 14 @ 8935' t\bte: Refer to R'oduction DB for historical perf data SIZE SPF INìERV AL OpnlSqz DA ìE 3-3/8" 18 8935 - 8950 0 12/08/95 3-1/8" 4 8982 - 9002 S 06/01/91 2-1/2" 5 9015 - 9055 0 OS/26/03 3-1/8" 4 9020 - 9038 S 06/01/91 3-3/8" 4 9050 - 9060 0 11/24/91 3-3/8" 6 9070 - 9101 0 11/24/91 3-1/8" 4 9126 - 9142 S 06/01/91 3-1/8" 4 9170 - 9177 S 06/01/91 3-1/8" 4 9186-9190 S 06/01/91 3-1/8" 4 9209 - 9218 S 06/01/91 3-1/8" 4 9228 - 9241 S 06/01/91 3-1/8" 4 9259-9267 0 10/28/91 3-3/8" 4 9276 - 9290 0 06/13/91 3-3/8" 6 9290 - 9292 S 06/01/91 I ::;g;: m - I / \9-5/8" CSG, 47#. N-80, 10 = 8.681" 1--1 æ=J-i 9432' 9450' ¡B DATE 12/01/TT 06/01/91 12/21/00 01/10/01 09/26/01 OS/26/03 REV BY OJM\J1&JTS ORIGINAL OJI'vPLETION LAST WORKOVffi SI8-SLT OJN\!ffiTED TO CAN\! AS SI8-LG REVISION RN'TP OJRRECTIONS BJM'TLP ADD PffiF DAìE RBI BY COMNENTS ) SAFETY NOTES: 2148' HT' CAM BAL-OSSSV NIPW/DMY, 10= 5.937" 1 ~ 8603' l-i T' X 4-1/2" XO I 8606' 1,9-5/8" X 4-1/2" BA KER MODEL D PKR \ 8706' 8717' 8718' 8702' 9093' 114-1/2" OTIS XN NO-GO NIP, 10= 3.725" I 1-14-1/2" BAKffi SHEAROUTSUB 1-14-1/2" TUB ING TA IL I \-1 B..MD TT LOGGED 06/13/91 \ 1--19-5/8" X 7" BAKER ECL PKR I 9146' 1--1 9- 5/8" X 7" SA KER ECL PKR \ 9353' I-iT' BAKffi V SET SHOE I 9371' \--1 FBTD I FRUDHOE SA Y UNIT WELL: 09-18 PERMIT No: 1770390 A R No: 50-029-20259-00 SEC 1, T1 ON. R15E, 1192.48' FEL & 3924.57' FNL BP Exploration (Alas ka) I Schlumberger I GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10177 Company: Alaska Oil & Gas Cons Corem Attn: Larrv Grant 3001 Porcupine Drive Anchorage, At( 99501 5/7/96 Field: Prudhoe Bay Anadrill Anadrill Anadrill Well Job # Log Description Date BL RF Sepia Survey Program Performance Calculation Letter D.S. 1-15 ?~f-d o "/ TUBING CUT RECORD 951223 I I ' D.S. 1-22A q,¢'.-/]'~-' IBPSETTING RECORD 951026 I 1 D.S. 2-11 77-0/,$ PROD PROFILE 96041 9 1 1 D.S, 3-11 '?~,-O"f'/ PERFRECORD 951224 I I .... D.S, 3-13 7~-¢'~1 PERFRECORD 951 21 0 I 1 D.S. 5-06A ~"- 0o'1' POGLM SETTING RECORD 951030 I 1 D.S. 5-06A ~.C'-0¢~ TUBING PUNCHER RECORD 951 026 I 1 -D.S. 5-23 J(f-e'ltr PERFRECORD 951020 I I , , D.S. 6-19 ~,~,.I,u-f CHEMICAL CUTTER RECORD 960420 I 1 ,D.S. 6-24 JP~--Iq7 PERFRECORD 951 226 I 1 D.S. 6-24 ~ ~.,.~ ,4'/ PERF RECORD 960423 1 1 D.S. 9-17 .. "27.(33,,o PERFRECORD 960422 I 1 D.S. 9-17 ~__'77',~1,ti~_INJECTION PROFILE 960422 1 1 D.S. 9-18 "?).-0 ~ ~{ :i '"' PERF RECORD 951208 1 1 9.S. 9-25 ~ '4 "13 ;l~ PERF RECORD 951208 1 1 D.S. 9-36C ct J"- I ~'( PATCH SETTING RECORD 951216 1 1 D.S. 9-36C qf..,(i,,I PERFRECORD 951 022 I 1 D.S. 9-38 o~'~- 0). I PERF RECORD 951 209 1 1 D.S. 12__2__15_~_ ~ J, - (2 ~, ~,. INFLATAB_LE BRIDGE PLUG 9 51 0 2 0 1 I _ Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. t k¥ 0 7 1996 Gas Cons. C0m~nissi0n ,~,~chora.qe STATE OF ALASKA ALASKA .AND GAS CONSERVATION C(' '_vllSSION REPORT uF SUNDRY WELL OPbRATIONS 1. Operations performed' Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other , 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, T10N, R15E, UM At effective depth 1332' FSL, 4102' FWL, Sec. 2, T10N, R15E, UM At total depth 1353' FSL, 4086' FWL, Sec. 2, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of ~levation(DE or KB) 54' RKB.' ,,'~ 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-18i 9. Permit number/approval number 77-39 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9450 feet Plugs(measured) 9199 feet Effective depth: measured 9320 feet true vertical 9073 feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 80' 20" 258 sx AS II 101' Surface 2685' 13-3/8" 5500 sx AS 2713' Production 9404' 9-5/8" 1000 sx CIG & 180 sx AS 9432' Liner 715' 7" 175 sx CIG 9353' True vertical depth 101' 2713' 9181' 9105' Perforation depth: measured 8935 - 8950'; 9050 - 9060'; 9070 - 9101'; 9259 - 9267'; 9276 - 9290' true vertical 8699 - 8714'; 8811 - 8821'; 8830 - 8860'; 9014 - 9021'; 9030 - 9044' Tubing (size, grade, and measured depth) 7", L-80, Tbg @ 8603' MD; 4-1/2", 12.64¢, L-80, Tbg @ 8718' MD. Packers and SSSV (type and measured depth) Camco BaI-O SSSV @ 2148' MD; Baker 'D' Packer @ 8606' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure ft ~..~. .... ~,....~. 14. Representative Daily Averaqe ~ or Iniectio~'D'at~;-4~ Prior to well operation Subsequent to operation JAN 04 t 96 Alaska Oil & Gas Cons, Cc,?~i~sion OiI-Bbl Gas-Md Water-Bbl Casing Pressure .... 18581 -- .... 19968 -- Tubing Pressure 1380 1394 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed OI~UI'It/IL~.~..OR. ~'.~,0~4 Title Engineering Supervisor Form 10-404 Rev 06/15/88 Date II l? SUBMIT IN DUPLICATE 12/8/95: MIRU & PT equipment. RI H 'W/Perforating Reperforated: gun & Shot 15' of reperforations as follows: 8935. 8950' MD (Z4) Used a 3-3/8,, OVerbalanced carrier and shot al Ref. Log: E~HCS 11/16/77. · POOH W/Perf gun I Perforations at 6 spf at 60 degree Phasin, · Noted all shots fired. Rigged down. g With Well Returned the well to Produced Water injection & obtained a valid injection rate. JAN 04 19°,6 Alaska Oil & G~s Cons. Commission Anchorage GeoQuest 600 W. International Airporl Road Anchorage, AK 99618-1199 ATTN: Sherrie NO. 8919 Company: Alaska Oii & Gas Cons Comm , Attn: Larry Grant t 3001 Porcupine Drive Anchorage, AK 99501 9/8/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar '7~- 9% D.S. 1-9A' ' PERF RE~ORD (8-15-94) 1 1 _~ D.S. 1-13 PERF RECORD (8-16-94) 1 1 ~ 9/--'~'=/ D.S. 3-3 PERF RECORD (8-15-94) 1 ..1 ?~==~o iD.S. 6-2 PERF RECORD (8-17-94) 1 1 ~ D.S. 6-13 iPROD LOG (8-16-94).. 1 1 ;I.-fY ~__ D.S. 6-24 PERF RECORD (8-17-94) 1 1 ~.-'~ ? D.S. 9-16 INJEO PROFILE (8-15-94) 1 ' 1 SIGN Please sign and return one copy of this transmittal to Sherrie at the above address. Thc~k you. DATE: ARCO Alaska, Inc. Date- Subject: From/Location- Telephone: To/Location: June 21, 1994 ARCO Cased Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution Well Number · u,~' 1-05ST 1.% !1-06 -sq- ! 5-* i ~o 1-11 i Log Datei Tool Type (M-D-Y) 6-13-94 i/''' DuaiBurst 6-13-94 I J Dual Burst 6-14-94 l" Perf Record 1-25 i 6-10-94 {/ PerfRecord ' 1-29 { 6-14-94 -''' Dual Burst 1-30 ! 6-08-94 ]/ CNL 3-02 ! 6-07-94 i/ Tubing Cutter 3-19 ! 6-05-94 i-/ Perf Record 4-36 ! 6-11-94 !'" Perf Record 4-41 ! 6-12-94 i'-/Cutter Record 5-11 I 6-11-94 I '" Dual Burst 9-15 ! 6-13-94 i / InjProf 9-18 i 6-14-94 i / InjProf 9-25 i 6-i4-94 i .," injProf 11-35 i 6-11-94 t -~ PerfRecord 11-36 ! 6-07-94 ! /' Perf Record 13-31 i 6-09-94 I f' Perf Record i 6-09-94 1/'' Perf Record Run,~, Scale 1 5" 1 5" I 5" 1 5" 1 5" I 5" 1 5" I 5" I 5" 1 5" I 5" 1 5" i 5" 1 5" 1.5" f 1, 5" 1,5" !13-35 ~ 14-03 ! 6-15-94 I f Prod Log f 1, 5" '~ 14-03 ! 6-15-94 i~' Dual Burst ! 1, 5" ,~ 16-23 i. 6-13-94 !~Leak Detection ! 1, 5" 16-23 i 6-10-94 i fAIPha Tubing ! 1, 5" { 17-02 } 6-6-94 if Prod Prof } 1, 1"&5" ! 18-02 i 6-12-94 tf Perf Record f 1, 5" 20~' ! 18-04 { 6-12-94 I/' Dual Burst i 1,5" i 18-19 i 6-10-94 l-"LeakDetection I 1,1"&5" Contractor i Sch Sch Sch Sch ; Sch Sch Sch i Sch Sch Sch Sch Sch Sch, Sch Sch Sch Sch Sch Sch Sch Sch * The correct APl # for 1-05ST is 50-029-20076-00 Number of Records: E. DeGrey Distribution: Central Files ANO-8 Geology Exxon Mobil Phillips BPX State of Alaska' ARCO Alaska, Inc. Is a Subsidiary of AlJantlcRIchfieldCompany -' '~ STATE OF ALASKA ALASKA~¢-~'. AND GAS CONSERVATION C("-- AISSION REPORT SUNDRY WELL OPERATIONS Operations performed: Operation shutdown Stimulate X Plugging Perforate 2. Name of Operator ARCO Alaska, Inc. Pull tubing Alter casing Repair well Other 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval At effective depth 1332' FSL, 4102' FWL, Sec. 2, T10N, R15E, UM At total depth 1353' FSL, 4086' FWL, Sec. 2, T10N, R15E, UM 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-18i 9. Permit number/approval number 77-39/92-139 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Conductor Sudace Production 9450' feet 9199' feet Liner Plugs(measured) Fill @ 9320' MD (6/6/92) 9320 feet 9073 feet Junk(measured) Length Size Cemented Measured depth 80' 20" 258 sx AS II 101' 2685' 13-3/8" 5500 sx AS cmt 2713' 9404' 9-5/8" 1000 sx Class G & 9432' 180 sx AS cmt 715' 7" 175 sx Class G 9353' True vertical depth 101' 2713' 9181' 9105' Perforation depth: measured 8935-8945'; 8945-8950'; 9050-9060'; 9070-9101'; 9259-9267'; 9276-9290' true vertical 8699-8709'; 8709-8714'; 8811-8821 '; 8830-8860'; 9014-9021 '; 9030-9044' Tubing (size, grade, and measured depth) 7", L-80, tbg @ 8603' MD; 4-1/2", 12.6~, L-80, tbg @ 8718' MD Packers and SSSV (type and measured depth) Camco "Bal-0" SSSV @ 2148' MD; Baker "D" pkr @ 8606' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure .... 20998 ~- 43539 Tubing Pressure 1898 1683 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil___ Gas .~. Suspended__ Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. FS~gr nmOS0.4 4 R~ev 06 1~~8~/ Title Sr. Area Operations Engineer Date RR4/11 KRF ~,m RW ,IWP SUBMIT IN DUPLICATE 9-18i DESCRIPTION OF WORK COMPLETED BREAKDOWN ACID STIMULATION TREATMENT 5~29/92: MIRU & PT equipment. RIH w/a CT mounted Inflatable Bridge Plug, and set plug at 9115' MD (center of element), to isolate the open perforations at: 9259 - 9267' MD (Z2) 9276- 9290' MD (Z1B) Ref. Log: BHCS 11/16/77. 5/30/92: Made dump bailer runs to dump 200 lbs of 20/40 mesh sand on top of bridge plug. 6/1/92: MIRU & PT equipment. above the bridge plug at: Pumped a fullbore Stimulation through the perforation intervals located 8935 - 8945' MD (Z4) 8945 - 8950' MD (Z4) 9050 - 9060' MD (Z3) 9070 - 9101' MD (Z3/2) Ref. Log: BHCS 11/16/77. Pumped Breakdown: a) 20 bbls Seawater @ 30 bpm, followed by b) 20 bbls Seawater w/0.6 ppg of 50% Benzoic Acid Flakes & 50% Rock Salt, followed by c) 455 bbls Non Crosslinked Gelled Seawater @ 30 bpm, followed by d) Shutdown. ISIP @ 2106 psi. Continued pumping 1st Acid stage: e) 50 bbls 50% Diesel/50% Xylene @ 14 bpm, followed by f) 50 bbls 15% HCl @ 14 bpm, followed by g) 20 bbls Seawater w/l.0 ppg of 50% Benzoic Acid Flakes & 50% Rock Salt. Continued pumping 2nd Acid stage: h) 46 bbls 50% Diesel/50% Xylene @ 14 bpm, followed by i) 53 bbls 15% HCI @ 14 bpm, followed by j) 20 bbls Seawater w/l.0 ppg of 50% Benzoic Acid Flakes & 50% Rock Salt. Continued pumping 3rd Acid stage: k) 50 bbls 50% Diesel/50% Xylene preflush @ 30 bpm, followed by I) 50 bbls 15% HCl @ 30 bpm, followed by m) 470 bbls Seawater displacement, followed by n) Shutdown. Rigged down. 6/5/92: RECEIVED s EP t 1 199[ Alask~t 0il & Gas Cons. Comm'~ss'~on ~Anch0rage RIH w/CT to jet sand plug from wellbore & retrieved the inflatable bridge plug. 6/7/92: Tagged fill on bottom at 9320' MD. Returned well to produced water injection & obtained a valid injection rate. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-10-92 REFERENCE: ARCO CASED HOLE FINALS 2-30 ~/_/o~ 6-6-92 Prod Profile Run 3-4 6-6-~ Inj Profile Run 3-20 6-5-92 Prod Profile Run 5-4 6-7-92 Prod Profile Run 7-7A~3~-/3 6-9-92 Prod Profile Run 9-18 6-7-92 Inj Profile Run 9-3s 6-6-92 ~nj Pronle ~11-16ST 6-12-92 Jewelry~ Run Lll-16ST 6-12-92 Gas Entry -/ Run 17-11 6-4-92 Inflatable Bridge Plug/CCL Run 1, 2"' & ~' Camco 1, 5" Camco 1, 5" Camco 1, 5" Camco 1, 5" Camco · 1, 5" Camco 1, 5" Camco 1, 5" Camco 1, 1~' & ~' Camco 1, 5" Camco 1, 5" Camco Please sign and return th%attached copy as receipt of data. RECEIVED BY ._~~. __~~' Have A Nice Day! ~'~_ C ~ iV~ 0' sonya Wallace au[_ 'I 5.19,92 APPROVED__~_~// ATO-1529 Alaska 0ii & Gas C0na. C~mmissi0n Trans# 9214~~--' A~chorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO STATE OF ALASKA ALASKA . AND GAS CONSERVATION CC IlSSIONr) APPLICA, ION FOR SUNDRY APr'ROVA S Re-enter suspended well Time extension Stimulate Variance Perforate 1. Type of Request: 2. Name of Operator ARCO Alaska, Inc. Abandon Suspend Operation shutdown Alter casing Repair well Plugging Change approved program Pull tubing 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval X Other 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-18i 9. Permit number 77-39 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool At effective depth 1332' FSL, 4102' FWL, Sec. 2, T10N, R15E, UM At total depth 1353' FSL, 4086' FWL, Sec. 2, T10N, R15E, UM 9450' feet true vertical 9199' feet 5. Type of Well Development Exploratory Stratigraphic Service 12. Present well condition summary Total depth: measured Plugs(measured) None Measured depth True vertical depth 101' 101' 2713' 2713' 9432' 9181' 9353' 9105' Effective depth: measured 9342' feet true vertical 9094' feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 258 sx AS II Sudace 2685' 13-3/8" 5500 sx AS cmt Production 9404' 9-5/8" 1000 sx Class G & 180 sx AS cmt Liner 715' 7" 175 sx Class G None Perforation depth: measured 8935-8945'; 8945-8950'; 9050-9060'; 9070-9101'; 9259-9267'; 9276-9290' true vertical 8699-8709'; 8709-8714'; 8811-8821'; 8830-8860'; 9014-9021'; 9030-9044' Tubing (size, grade, and measured depth) 7", L-80, tbg @ 8603' MD; 4-1/2", 12.6~, L-80, tbg @ 8718' MD Packers and SSSV (type and measured depth) Camco "BaI-O" SSSV @ 2148' MD; Baker "D" pkr @ 8606' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch X 14. Estimated date for commencing operation May, 1992 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED BY LONNIE C. SMITH Date ~'/'~ 2.---/~'Z.~. 15. Status of well classification as: Gas Suspended Injector I Approval No¢~ _/,.~ ~, ,,ppr'oved Copy Returned Approved by order of the Commissioner Commissioner Date feet Form 10-403 Rev 06/15/88 834/8 KRF cc: SW. JWP SUBMIT IN TRIPLICATE 9-18i PROPOSED STIMULATION PROCEDURE ARCO Alaska, Inc. proposes that a Simulation be performed on Well 9-18i. We propose to treat the injection intervals at 8935 - 8950'; 9050 - 9060'; and 9070 - 9101' MD, as follows · I ) Pressure test; spot isolation sand plug over lowermost perforations at 9259 - 9267', and 9276 - 9290' MD. 2) Pump Perforation Breakdown Treatment w/400 bbls viscosified seawater @ 30 bpm. 3) Pump 50 bbls Diesel/Xylene preflush @ 30 bpm. 4) Pump 50 bbls 15% HCI @ 30 bpm. 5) Pump 20 bbls Saturated Brine w/Benzoic Acid Flakes / Rock Salt @ 1 ppg as diverter @ 30 bpm. 6 ) Repeat Steps 3,4, & 5. 7 ) Pump 50 bbls Diesel/Xylene @ 30 bpm. 8 ) Pump 50 bbls 15% HCI @ 30 bpm. 9 ) Flush w/350 bbls Seawater @ 30 bpm. I 0) Rig down equipment. I 1) Return well to injection & monitor rates. 12) Clean out sand plug w/CTU. 13) Return well to injection service. 5 COILED 1UBINt3 UNIT BOP EOU I P~Ni 1. 5000 PSI ?" WELLHEAD CONNECTOR IrLAhOE 2. ~,000 PSI 4 1/16" PiPE RA~$ 3. 5000 PSI 4 !/6" HYD~LK~ SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16'' sTurrmNG BOX L HIRELINE BOP EOUIPHENT 1. 5000 PSI ?" WELLHEAD CONN£C10R FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" L UBRICA10R 4. 5000 PSI 4 1/6" FLOW TUBE PACK-Olrlr ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 4-27-92 REFERENCE: ?~ ? 1-15 ?~ 3-7 ARCO CASED HOLE FINALS 2-9-92 2-27-92 3-1-92 3-13-92 3-15-92 3-1-92 3-1-92 4-7ST 4-7ST 4-9 ~-3 ~, 4-15 4-42 5-12 ??-/~/ 2-11-92 17 ~z-?o -11-92 ~?~_ ~f/ i7-1 2-18-92 7-1 2-18-92 ?~'- ;g 9-1 2-28-92 ¢~-/~ 9-2 2-8-92 ?~)? 9-18 3-14-92 ~---~'~ 9-27 2-7-92 ~ F-~/g / 9-31 2-8-92 Prod Prof Run 1, 5" Camco InJ Profile Run 1, 5" Camco Jewelry Run 1, 5" Camco Prod Prof R,n 1, 5" Camco InJ Prof R~m 1, 5" Camco InJ Prof R~m 1, 5" Camco PITS Ru_n 1, 5" Camco Prod Prof R-n 1, 5" Camco Jewelry Run 1, 5" Camco Prod Prof R!~n 1, 5" Camco GR/CCL/Jewelry R-n 1, 5" Camco Prod Prof Run 1, 5" Camco Prod Prof Run 1, 5" Camco Prod Prof Run 1, 5" Camco InJ Prof Ru_n 1, 5" Camco Prod Prof Run 1, 5" Camco Prod Prof Run 1, 5" Camco pleUe sign and return the attached copy as receipt of data. RECEIVED BY ~_~ ~[C~IV~0 APP R OVEII~sk~ ~i~/~ tons. commission Trans# 9207~'-T2~ate Have A Nice Day! Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO * The Correct well name for this log is 4-7ST. ARCO ALA£KA, INC. P.O. BOX i00360 ANCHORAGE, ALASKA 995i0 DATE' t-tD-92 ~'" L'-16 t~..-6-9t /,6CL FOR STRE$£ FRAC -,,..~.-3-t4 t'..'-t0-9t ~"x,,4'i;L;I._ iUi-: 5'~t(E,S'~' Fi~AC F7 , '~ i2-i8-~i v .CCL FOR..,BRIDGE PLUG r/i-.,J~tt-3 t2-26-9t ,-/' CCL FOR TUBING ,CUTTER ~4 ,..,¢~4 4-35 7-L-'.8-9 t ~';'N ' _ 2t0"'1¢I~ i ...~-i 5 7-22-9t ,.~ ~$N , - u_'..~t t8-t6 t2-9-9t --/,/CCL FOR STRE~$ F'RAC ~}~., d8-2~ t2-26-9~ v CCL FOR PERF PLEA3'E SIGN AND RETURN THE ATTACHED COPY AS' RECEIPT OF DATA. ,S'ONYA WAL. L AL;I::. APF'RU;,"L:D A'i-0-i 529 TF:AN3:~: ,o2x:'-006 RUN 3, 5" HL$ RUN t, 5" HL$ RUN t, 5" HL$ RUN t, 5" HL$ RUN t, 5' HL~ RUN ~, 5' HL$ RUN i, 5" HL_Z RUN i, 5" HL$ RUN ~, 5' HL$ RUN ~, 5' HL£ RECEIVED JAN 2 1 1992 Oil & Gas C'a'ns. Commission Anchorage D!~TRIBU'f'ION · "'CEN I'I;..'AL FrLEZ -'~,. C H E V R 0.. N · " EXTEN:'2. 1' F~N EXPLOF;:AT I F~N ir .. , · ~ EXXON '11' HARATHON -.-~' MOBIL '"' F'H II_L l F'5' F'B WELL F'IL.E.'~; R & D '"' BF'X '1~" · "- i,.'TA'i'E OF AI_A~.;'I-(A T E.". X A C 0 ARCO ALA~'KA, INC. F'. 0 · BOX i ANCHORAGE, ALASKA 995 i 0 /6 DATE.' t 2-St -9t REFERENCE ' ~/~ i -26 4-S6 9-t7 ARCO CASED HOLE FINALS "~7oot '//LEAK DETE i- z-i / 'cT ILE -2-9t~ JEWELRY -i9-9t ~ 1NJ PROFILE · -~8-9~ ~/GAg LIFT -23-9~ V/LEAK DETECT ~-28-9~ ~. LE~K DETECT , -~6-9~ / INJ PROFILE/FIT,~ -~9-9~~ LEAK DETECT ~-2~-9~ / GR/CCL TIE-IN -~-9~ ~ PRODUCTION -~9-9~/ PROD PROFILE -29-9~ ~ INJ PROFILE -3-9~ INO PROFILE 9-2~-9~ INd PROFILE PLEASE SIGN AND, RETURN THE ATTACHED COF'Y AS RECEIVEI) BY HAVE A NICE DAY! RUN t, t" RUN t , 5 · RUN t, 5. · RUN t, 5 · I::,'UN i, 5 · RUN t, 2'&5" RUN t, 2'&t.3' RUN i , 5' RUN t , 5:" RUN i , 5 ' RUN t , 5" RUN t , 5" RUN i, 5" RUN t , 5' RUN i , 5" RUN t , 5" RUN t , 5' RECEIPT OF DATA $ONYA WALLACE ATO- i 529 CAMCO CAMCt] CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMUO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO . DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXF'LORATION EXXON MARATHON MOBIL F'HILLIF'~ PB WELL F'ILE,.$' R & D '"' BP X $'i"AfE OF' ALA~'KA TEXACO RECEIVED JAN 10 199z Alaska Oil & Ga~ Cons. Commissior.. Anchorage STATE OF ALASKA ALASKA . AND GAS CONSERVATION CC fiSSION REPORT (JF SUNDRY WELL OPEI ATION 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 642' FSL, 224' FWL, Sec 1, T10N, R15E, UM. At top of productive interval 1256' FSL, 4164' FWL, Sec 1, T10N, R15E, UM. At effective depth 1338' FSL, 4150' FWL, Sec 1, T10N, R15E, UM. At total depth 1353' FSL, 4086' FWL, Sec 1, T10N, R15E, UM. 5. Type of Well Development Exploratory ,, Stratigraphic Service X 6. Datum of elevation(DF or KB) 54 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-18i 9. Permit number/approval number 77-39 / 91-279 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9450 feet Plugs(measured) 9199 feet Effective depth: measured 9371 feet true vertical 9122 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 258 Sx AS II 101' 101' Surface 2685' 13-3/8" 5500 Sx Arctic Set 2713' 2713' Production 9404' 9-5/8" 1000 Sx CI 'G' & 180 Sx AS I 9432' 9181' Liner 715' 7" 9353' 9105' Perforation depth: measured 8935-8945'; 8945-8950'; 9050-9060'; 9070-9101'; 9259-9267'; 9276-9290' true vertical 8699-8709'; 8709-8714'; 8811-8821'; 8830-8860'; 9014-9021'; 9030-9044' Tubing (size, grade, and measured depth) 7", 26~, L-80, Tbg @ 8603' MD; 4-1/2", 12.6#, L-80, PCT Tail @ 8718' MD Packers and SSSV (type and measured depth) Camco BaI-O SSSV @ 2148' MD; Baker 'D' Packer @ 8606' MD 13. Stimulation or cement squeeze summary J~, [~ ~ [~ i V r' Intervals treated(measured) see Attached J, ,N - 6 392 Treatment description including volumes used and final pressure Alaska 0il & Gas Cons, Commissio~ Representative Daily Average Production or In)ection Data Anchorage Prior to well operation Subsequent to operation OiI-Bbl Gas-Md . Water-Bbl ~. Casing Pressure Tubing Pressure 4000 ,O~o~ ' -- 1779 1o00o -- 1371 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations . 16. Status of well classification as: Oil Gas Suspended, . Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed v Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE MRM cc:SW, JWP. 9-18i DESCRIPTION OF WORK COMPLETED HYDRAULIC FRACTURE TREATMENTS 7/21/91: ~' ' MIRU & PT equipment to 9000 psi. Pumped a Pedoration Breakdown Treatment, followed by a Zone 1 Propped Fracture Treatment using resin coated 16/20 mesh proppant, through the perforations at: 9276 - 9290' MD (Z1B) Ref. Log: BHCS 11/16/77. Pumped 437 bbls 120 degree 10# Gelled Seawater @ 25 bpm, followed by Shutdown. ISIP @ 1204. Resumed pumping 68 bbls Crosslinked Pad, followed by 81 bbls Cross Linked Slurry, @ 1 - 11 ppg, followed by 350 bbls Flush w/15 bbls of 20/40 mesh sand slurry to place a sand plug, followed by Shutdown. Placed a total of 13,000 lbs of proppant into Zone 1 of the formation. Rigged down. 7/22/91: MIRU & PT equipment, then made tag run to top of sand plug at 8430' MD. RIH w/CT & reversed out sand plug down to 9090' MD. POOH w/CT, then RIH w/perforating gun & shot Zone 4 perforations. Reperforated: 8935 - 8945' MD (Z4) Ref. Log: BHCS 11/16/77. PT equipment to 9700 psi, then proceeded to pump a Hydraulic Fracture Treatment through the Zone 4 pedorations (listed above), located above the sand plug. Pumped 450 bbls Pre Pad @ 25 bpm (first 100 bbls crosslinked), followed by Shutdown. ISIP @ 2080. Resumed pumping 68 bbls Crosslinked Pad @ 35 bpm, followed by 186 bbls Cross Linked Slurry @ 1 - 2 ppg proppant concentrations, followed by 452 bbls Flush, followed by Shutdown. Placed a total of 9,000 lbs of proppant into Zone 4 of the formation. Rigged down. 8/1 8/91: Reperforated' 8945 - 8950' MD (Z4) Ref. Log: BHCS 11/16/77. I 0/1 3/91: MIRU & PT equipment to 9400 psi. Pumped an Acid Treatment, followed by a Zone 4 Propped Fracture Treatment using resin coated !6/20 mesh proppant, through the Zone 4 perforations (listed above). Pumped 64 bbls NH4CI Water, followed by 90 bbls 15% HCI, followed by 48 bbls 12% HCl-3% HF, followed by 440 bbls NH4Cl Water, followed by 28 bbls Meth/Water Flush. Continued pumping 417 bbls 10# Gelled Pre Pad @ 25 bpm, followed by Shutdown. ISIP @ 1729. Resumed pumping 193 bbls Crosslinked Pad, followed by 271 bbls Cross Linked Slurry, @ 1 - 11 ppg, followed by 335 bbls Flush, followed by Shutdown. Placed a total of 29,500 lbs of proppant into Zone 4 of the formation. Rigged down. 10/15/91 - 10/21/91: Performed proppant fill cleanouts down to 9350' MD. I 0/28/91: Added perforations: 9070 - 9078' MD (Z3/2) Ref. Log: BHCS 11/16/77. 9088 - 9101' MD (Z3/2) Reperforated: 9078 - 9088' MD (Z3/2) Ref. Log: BHCS 11/16/77. 9259- 9267' MD (Z2) I I/24/91: Reperforated: 9050- 9060' MD (Z3) 9070 - 9101' MD (73/2) Ref. Log: BHCS RECEIVED 11/16/77.~!aS~' Oil & Gas Cons. C0mmissi0[~ Anchora,qe Returned well to produced water injection & obtained a valid injection rate. DATE' ii-8--9i REFERENCE' ARCO CASED HOLE FINALS ~3--7 ~-~ CNL PERF RECORD X - Y [,' A l.. ]1P El R TUBING F' A'f'C !'~, P E:' f;:f:' RECOF;-:I) F'EF:F RECORD F:'IT RF RECORD RUN 'i, 5" RUN ~ , 5' R LIN "~ ':~' ' R U N i, ~ ~- · RUN ~, ~' R U N i, ~ ' AS RECEIF"F OF DATA. S C H SCI-I CAHCO ,'f; C: 1..t S' [; t..I SCI--i .'~; C H D i ,S'TR I BU i' ]1 ON · .. c F- i',~ T p A i l: 'r L E ~" CHEVRON F'B WELL_ FILES D & M R & D ~ EXTENSION EXPL. ORATION ::: BPX . ~ EXXON ....... ~ .STATE OF., ALASKA ~':" '~" MARATHON · " MOBIL ARCO ALASKA, INC. P.O. BOX t00S60 ANCHORAGE, ALASKA 99,.,3 DATE' 9-t 9-9t REFERENCE' ARCO CASED HOLE FINAL~ x'~-S..- 6-~2-9.. ~ PERF RECORD RUN t , 5 · '-~-_'-o 5-St-9~ PERF RECORD RUN ~2-9 8-~6-9~ F'ERF RECORD RUN --2--26. 5-S~-9~ PERF RECORD RUN ~, 5' ~S-27 8-~6-9~ F'ERF RECORD RUN -4-'~'~.. 5 _o7-9i F'ERF REUDRD RUN ~ , 5" '5-5 5-°4-9i~. PERF RECORD RUN 5-i~. ': U--28--9t PERF RECORD RUN t, 5' 7-1 t 6-38-9~ PERF RECORD RUN i, 5' 7-28 7-°~-~i,... . PERF RECORD RUN t , ~." ~ ~-4 7-29-'9~ PERF RECORD RUN ~i-6 7-°'~--°~ F'ERF RECORD RUN 42-~4 8-6-9~ PERF RECORD RUN ~, 5" 42-28 5--29-9~ PERF RECORD RUN ~, 5' JS-28 8-~9-9~ PERF ~ECURD RUN t, 5' "~ 4-9B 8-2~-9~ PERF RECORD RUN x~5-25 8-~-9~ PERF RECORD RUN ~, 5" PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIF'T OF DATA. RECEIVED BY _ · FtAVE A NICE DAY! ;~. ONYA WALLACE ATO-i ~'~9.,... A P F' R 0 V E D"''~'1~ ~_v~_- T' F;..' A N S :~ 9 F-IL3' ~--~L.. ~ I--t L.,S' I.-IL,~ I--IL.Z f-tL_;~ HL,S' I--tLZ HLS' I--IL~ I'-I L,S' I--! L,S' HLZ HI_Z I-I/..5: HLb: HI._Z HLS' HLZ HLZ I-tL.Z DI£-'TRIBUT]:ON CENTRAl_. FILE.'? r'.' FI E V R 0 N D & M EXTENCION EXF'LORAT ION EXXON MAF,'ATHON MOBIL F'FII L.L I F'L? F'B WELL FILE.? R & D BPX ZTATE OF ALA.~;'I<A TEXACO TFtF CORRECT AF']:~: FOR I-tB IS 50-(.~'"29-2t .¢.)6,7-6~t THE CORRECT AF'I~ FOR 2-3 TI-IE CORRFCT APl" FOR 3-27 ]:5' 5¢-~29-2ti¢)9. THE CORRECT LOG INT. FOR 5-i2 l~' 88J6'-9249'. TFiE COF.:RECT AF']:~: FOR t4-9B l'r,' 5(-)--,~29-2,'-'","~.':~;4-£:,2 RECEIVED OCT 0,5 1991 Naska 0tl & Ga~ Cons. ~mi,j¢Oa STATE OF ALASKA ALASKA _ AND GAS CONSERVATION CC ~IISSION APPLICA' -ION FOR SUNDRY APr, ROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Attercasing Repairwell Plugging Time extension Stimulate X Change approved program Pull tubing Variance Perforate __ Other , ,, 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, T10N, R15E, UM At effective depth 1338' FSL, 4150' FWL, Sec. 1, T10N, R15E, UM At total depth 1353' FSL, 4086' FWL, Sec. 1, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service R CEiV D Alaska 0ii & Gas Cons. C0mmissi0r~ Anchorage 6. Datum of elevation(DF or KB) 54 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-18i 9. Permit number 77-39 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9450 feet Plugs(measured) 9199 feet Effective depth: measured 9371 feet true vertical 9122 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 258 sx AS II 101' 101' Surface 2685' 13-3/8" 5500 sx AS 2713' 2713' Production 9404' 9-5/8" 1000 sx CI 'G'& 180 sx AS I 9432' 9181' Tieback Liner 715' 7" 9353' 9105' Perforation depth: measured 8935-8945'; 8945-8950'; 9276-9290' true vertical 8699-8709'; 8709-8714'; 9030-9043' Tubing (size, grade, and measured depth) 7", 26#, L-80, tbg @ 8603' MD; 4-1/2", 12.6#, L-80, PCT tail @ 8718' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV @ 2148' MD; Baker 'D' packer @ 8606' MD 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X. 14. Estimated date for commencing operation September 1991 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer FOR COMMISSION U~E ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Mechanical Integrity Test , 15. Status of well classification as: Gas Suspended Injector Approved by order of the Commissioner Date I Approva,No~,/--,¢2~ ¢ Location clearance Subsequent form required 10----'~:2~ ~pproved Copy Returned ORIGINAL SIGNED BY ~ - :x o- .~j _ LONNIE C. SMITH Commissioner Date cj. J'l- cJ1 Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DRILL SITE 9-18i IVISHAK, ZONE 4 FORMATION HYDRAULIC FRACTURE TREATMENT PRELIMINARY PROCEDURE ARCO Alaska, Inc. proposes to fracture stimulate Prudhoe Bay injection well 9-18. The stimulation will be designed to treat the sand from 8935' MD to 8950' MD through existing perforations. The following is a procedural summary. 1. Pressure test tubulars and annulus. 2. Rig up fracturing service company. 3. Pump fracture treatment as follows: B. C. D. E. F. G H. I. J. K. L. M. N. 100 bbls 1% NH4CI water @ 25 bpm 50 bbls 15% HCI acid @ 25 bpm 50 bbls 12:3 HF acid @ 25 bpm 100 bbls 1% NH4CL water @ 25 bpm Displace above thru perfs @ 5 bpm with 1% NH4CL or equivalent. Shut down. Prime equipment to pump 200 bbls cross-linked pad 75 bbls with 1 ppg 16/20 50 bbls with 2 ppg 16/20 30 bbls with 3 ppg 16/20 20 bbls with 4 ppg 16/20 15 bbls with 6 ppg 16/20 proppant. @ 25 bpm proppant in cross-linked water @ 25 bpm proppant in cross-linked water @ 25 bpm proppant in cross-linked water @ 15 bpm proppant in cross-linked water @ 15 bpm proppant in cross-linked water @ 15 bpm 75 bbls with 8 ppg 16/20 proppant in cross-linked water @ 15 bpm 332 bbls gelled water flush 4. Rig down frac equipment. 5. Perform slickline tag. 6. Rig up CTU and perform cleanout to PBTD. 7. Return well to injection service. R£CF. IyrcD 6 5 4 3 2 COILED TUBING UN]'[ BOP EOU l PMENT 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE: 2. 5000 PSI 4 1/16" PIPE RAHS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAHS 6. 5000 PSI 4 1/16" STUFFING BOX 3 H]RELINE BOP EOUIPHENT 1. 5000 PSI ?" WELLHEAD CONN£CIOR rLANO£ 2. 5000 PSI WIRELIN£ RAUS (VARIABLE SIZE) ~. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, INC. P.O. BOX 100360 ..... ANCHORAGE, ALASKA 995 . -~ DA]"E' 8-t 6-9t REFERIENCE' ARCO CASED HOLE FINAI_$ ~ 2-3 7-26-9t CNL-GR RUN ~--~:.. 8 S-9 ~ COI_LAR-PERF RUN S-2S 7-26-9i TUBING CUTTER ' RUN ~/-Y~S-S5 7-'25-9~ PFC-6R (PACKER SETTING) RUN ~, '~--., ~S 7-S0-9~ PFC RUN ~ , ~' ~-~5-S2 8-S-9~ COLLAR/PACKER RUN 7-2 7-26-9t CNL-6R RUN i, 5' 7-i'7 7-Si -9i COLLAR RUN i, 7-29 7-3i-9t COLLAR-PERF RUN 9-2 8-~-9~ TUBING CUTTER RUN 9-9 8-t-9i COLLAR--F'ERF RUN i, 5' 9-i 8 " ~'~-' ~" F-~,~ 91 COLLAR-F'ERF RUN · .. ¢ -~4--9 ~ CNL-'(; R RUN ~ 2-29 ~ o- 9 , ,-,:4-. t CNt_-'GR RUN t 5 F'LEASE SIGN AND RETLlt:.N THE ATTACHE]D COPY AS I:I:ECEiPT (;IF I)ATA RECEIVED BY ~_.~.. HAVE A NICE DAY! SON'fA WALLACE ATO-'i 529 AF'F'ROVE:D TRAN$~ 9i A '1' L. (4 ,? A i' L.A ,? A'FL. AS A'i I_AZ A FL..AS AI'LA,'~ A T' L. A AT LA A iL. AS n'rLn,~ ATLA~''~ ATLAS Ai'I_AS' D I S T Fi: I B U T t 0 N ..-'~ -CENTRAL FILES ~'- nFIEVRON -ii· D & M · ,,.~' EXTE:N$ION . E:XF'L. ORAi" I ON. ~ EXXON MARATHON · .~ MOBIL PHI LL I F':':,' F'B HELL. F']iL.E:5' R & D ~: B P X · .-'"' STATE OF. AL.A;.;JK A T E X A C 0 ;~ 'i"HE:CORRECTED AF'I~ FOR'°--S ]:S "~'A-;:.~gg'-'.'.~¢.',077 · - ,~. ,..' ... ._ ~ ,.. ......~ ~':~ THE C[]F:RECTED AFZZ:~ FOR,?9-SO l&" 50-0'29-2t4'i 'i ,. 4LI~ 1 9 19,9/ :4laska 0il 4 aas Cons. 4nchor~ge C°mm/SSior i . STATE OF ALASKA ~ OIL AND GAS CONSERVATION COMMII:~ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown m Alter casing X Repair well Stimulate Plugging __ Perforate Pull tubing × Other X Workover 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval At effective depth 1332' FSL, 4102' FWL, Sec. 2, T10N, R15E, UM At total depth 1353' FSL, 4086' FWL, Sec. 2, T10N, R15E, UM 6. Datum elevation (DF or KB) RKB 54' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number 9-18 9. Permit number 77-39/91-056 10. APl number 5O-029-2O259 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. 13. Present well condition summary Total Depth: measured true vertical 9450' 9199' feet feet Plugs (measured) None Effective depth: measured 9342' true vertical 9094' feet feet Junk (measured) None Casing Length Size Structural Conductor 8 0' 2 0" Surface 2685' 1 3-3/8" Cemented 258 sx AS II 5500 sx AS cmt Production 9404' Liner 71 5' 9 - 5 / 8" 1000 sx Class G & 180 sx AS cmt 7" tieback 175 sx Class G Perforation depth: measured None open to production true vertical None open to production Tubing (size, grade, and measured depth) 7" / 4-1/2", L-80, tbg w/ tail @ 8719' Packers and SSSV (type and measured depth) Camco 'BaI-O' SSSV ~ 2148'~ Baker 'D' pkr ~ 8606' Stimulation or cement squeeze summary N/A Intervals treated (measured) From 9100' to 9235' Treatment description including volumes used and final pressure 1500 cjal 12°/, HCI/10% X¥1ene and 160 sx Class G cmt Measured depth 101' 2713' 9432' 9353' True vertical depth 101' 2713' 9181' 9105' 14. 15. N/A Prior to well operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Subsequent to operation Attachments *Workover Well History Copies of Logs and Surveys run __ Daily Report of Well Operations X* 16. Status of well classification as: Oil Gas Suspended Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed -i ~ (,. l'}/'l~i / Form 10-404/Rev 05/17/89 Title Drillincj Analyst Date SUBMIT IN DUPLICATE ARCO ALASKA INC. WELL: 9-18 FIELD: UNIT: LEASE: API: PERMIT: AFE: WI: PRUDHOE BAY 28327 50-029-20259 77-39 AS4257 21.7800 DAILY OPERATIONS ACCEPT: 5/20/91 SPUD: RELEASE: 6/1/91 OPERATION: WORKOVER RIG: AUDI 4 PAGE 1 05/21/91 ( TD: 0 PB: 9371 SUPV:MWG 05/22/91 ( TD: 0 PB: 9371 SUPV:MWG 05/23/91 ( TD: 0 PB: 9371 SUPV:MWG 05/24/91 ( TD: 0 PB: 9371 SUPV:MWG 05/25/91 ( TD: 0 PB: 9371 SUPV:MWG 05/26/91 ( TD: 0 PB: 9371 SUPV:MWG 05/27/91 ( TD: 0 PB: 9371 SUPV:MWG 2) 3) 6) 7) POOH W/ PERF GUN. 7"@ 9430' MW: 8.6 Seawater MOVE RIG F/ DS 16-9A TO DS 9-18. RIG ACCEPTED @ 18:00 HRS, 5/20/91. R/U LINES, VALVES. R/U ATLAS LUB. PRESS ANNULUS. PERF 8 HOLES F/ 8680'-8682'. PRESS ANNULUS. PERF 8 HOLES F/ 8620'-8622'. POOH. PUMP 320 BBLS SEAWATER DN TBG. RIH W/ 2-1/8" PERF GUN. PRESS ANNULUS. PERF 10 HOLES F/ 8520'- 8522'. LOST PRESS IN ANNULUS. POOH. DAILY:S74,880 CUM:$74,880 ETD:S74,880 EFC:$1,200,670 L/D TBG. 7"@ 9430' MW: 8.5 Seawater PUMP DN ANNULUS. MONITOR WELL. CIRC. MONITOR WELL. SET BPV. N/D TREE. N/U BOPE. TEST BOPE. PULL HGR. L/D SAME. CBU. SPOT 100 BBLS HEC PILL. POOH W/ 7" TBG. L/D SAME. DAILY:S26,888 CUM:$101,768 ETD:S101,768 EFC:$1,200,670 CBU. 7"@ 9430' MW: 8.5 Seawater L/D TBG. TEST BOPE. RIH W/ PKR MILL. MILL PKR @ 8705'. FELL FREE. CBU. DAILY:S38,220 CUM:$139,988 ETD:S139,988 EFC:$1,200,670 WAIT ON OVERSHOT. 7"@ 9430' MW: 8.6 Seawater CBU. POOH. L/D FISH. RIH W/ MILL. WASH FILL F/ 8956'-9071'. PUMP 100 BBLS SWEEP. POOH. L/D BHA. WAIT ON OVERSHOT. DAILY:S29,452 CUM:$169,440 ETD:S169,440 EFC:$1,200,670 RIH. 7"@ 9430' MW: 8.6 Seawater RIH W/ OVERSHOT TO 9071'. WORK TO 9078'. POOH. NO RECOVER. RIH W/ BIT. TAG @ 9074'. WORK BIT TO 9077'. POOH. RIH. DAILY:S36,370 CUM:$205,810 ETD:S205,810 EFC:$1,200,670 L/D FISH TOOLS. 7"@ 9430' MW: 8.6 Seawater RIH W/ WASHPIPE. TAG FISH @ 9073'. WORK TO 9082'. POOH. RIH W/ OVERSHOT. TAG FISH @ 9353'. WORK TO 9356'. ATTEMPT TO ENGAGE FISH. POOH. L/D FISH TOOLS. DAILY:S31,770 CUM:$237,580 ETD:S237,580 EFC:$1,200,670 POOH. 7"@ 9430' MW: 8.6 Seawater R/U ATLAS. RAN 8.5" GR/JB TO 9360'. SET EZSV @ 9100' R/D ATLAS W/L. RIH TO 9100' ENGAGE EZSV. CBU. TEST LINES. PUMP 1500 GAL 12% HCL/10% XYLENE. DISP W/ 200 BBLS SEAWATER. PUMP 160 SX 'G' CMT W/ 14% SUREFILL, 5.32% PERFEC SEAL (41 BBLS). DISP W/ SEAWATER. SQZ W/ 2900 PSI. TEST PERFS. POOH. DAILY:S73,470 CUM:$311,050 ETD:S311,050 EFC:$1,200,670 ARCO ALASKA INC. WELL: OPERATION: RIG: 9-18 WORKOVER AUDI 4 05/28/91 ( 8) TD: 0 PB: 9371 SUPV:MWG 05/29/91 (9) TD: 0 PB: 9371 SUPV:MWG 05/30/91 (10) TD: 0 PB: 9371 SUPV:SMS 05/31/91 (11) TD: 0 PB: 9371 SUPV:SMS 06/01/91 (12) TD: 0 PB: 9371 SUPV:SMS 06/02/91 (13) TD: 0 PB: 9342 SUPV:SMS DAILY OPERATIONS PAGE 2 POOH. 7"@ 9430' MW: 8.6 Seawater RIH. TAG CMT @ 9092' TEST CSG. DRLG CMT RET & CMT TO 9235' WASH TO 9300'. TEST CSG. WASHTO 9355' PUMP 100 BBLS HEC SWEEP. TEST CSG. POOH. REV CIRC. POOH. DAILY:S32,570 CUM:$343,620 ETD:S343,620 EFC:$1,200,670 RIH W/ BIT. 7"@ 9430' MW: 8.6 Seawater POOH. TEST BOPE. RIH W/ 7" CSG. TAG @ 9356'. CBU. CMT LNR W/ 175 SX 'G' CMT. LNR F/ 8638'-9353'. HUNG LNR & SET BAKER 'ECL' PKR. RELEASE F/ LNR. POOH. M/U BHA. DAILY:S113,070 CUM:$456,690 ETD:S457,090 EFC:$1,200,270 CIRC. 7"@ 9430' MW: 8.6 Seawater RIH W/ BHA #9. TAG TOP OF CMT @ 8429'. DRLG CMT TO 8638' (TOL). CBU. TEST TOL. REV CIRC. POOH. RIH W/ BHA #10. TAG TOL @ 8638' DRLG CMT TO 8661'. RIH. TAG CMT @ 9244' CRLG CMT TO 9272'. DRLG LC F/ 9272'-9273'. DRLG CMT TO 9342'. PUMP 100 BBLS HEC SWEEP. DAILY:S25,470 CUM:$482,160 ETD:S482,560 EFC:$1,200,270 L/D DP. 7"@ 9430' MW: 8.6 Seawater PUMP 100 BBLS HEC PILL. TEST 7" LNR. RIH. REV CIRC. DISP W/ 8.6 PPG SEAWATER. POOH. PULL PACKOFF. INSTALL NEW PACKOFF. TEST SAME. POOH W/ STORM PKR. L/D BHA. RIH W/ 4-1/2" TAIL & PKR ASS'Y. SET PKR @ 8588'. DROP BALL. RELEASE F/ PKR. TEST PKR. POOH. DAILY:S30,074 CUM:$512,234 ETD:S512,634 EFC:$1,200,270 LAND 7" TUBING 7"@ 9430' MW: 8.6 Seawater POOH & LDDP. C/O RAMS & TEST SAME. MU SEAL ASSY & RIH W/ 7" COMP. STING INTO PKR & SPACE OUT. DAILY:S25,230 CUM:$537,464 ETD:S537,864 EFC:$1,200,270 RIG RELEASED 7"@ 9430' MW: 8.6 Seawater MU & TEST CNTL LINES TO SSSV. FREEZE PROT W/ DIESEL & C-120 TO 2000'. LAND TBG & RILDS. TEST TBG TO 3500 & CSG TO 2000 PSI. INSTALL BPV. ND BOP & NU TREE. TEST SAME. SECURE WELL. RIG RELEASED @ 14:30 HRS, 6/1/91. CAMCO 'BAL-O' SSSV @ 2148', BAKER 'D' PKR @ 8606', TT @ 8719'. DAILY:S397,570 CUM:$935,034 ETD:S935,434 EFC:$1,200,270 SIGNATURE: - DRTLLING SUPERINTENDENT DATE: ARCO ALASKA, INC. P,O. BOX ice360 -- ANCHORAGE, ALASKA 99L DATE: 7-t 2-9t ..-REFERENCE: ARCO CASED HOLE FINALS i-ii 6-5-9i PROD F'ROFILE~" RUN i, 5' CAMCO i-ii 6-5-9i GR-COLLAR J RUN t, 5' CAMCO i-2i 6-?-9i PROD PROF'ILE~' RUN t, 5' CAMCO ~,)4-36 6-i9-9i CBT./ RUN t, S' SCH (4-36 6-t9-9i CET~- RUN t, S" SCH ~.4-36 6-2i-9i F'FC-GR (PACKER SETTINGY RUN t, 5" ATLAS [4-37 6-2t-9i CBT~ RUN t, 2'&S' $CH ~J4-37 6-2t-9i CET~ RUN t, 2'&~' $CH ~'~...4-37~1' 6-24-9t F'FC-GR (PACKER SETTING)--~ RUN t, 5" ATLAS '~-~t a-2e-et GR-CCL~ RUN l, 5' ATLAS ~~ ~5-3~~L5 7-2-~i COLLAR-F'ERF~ RUN t, S' Al'LAS -33 7-2-9t PRODUCTION F'ACKER~ RUN t, 5' ATLAS ~I-8~ 5-3S 6-30-ei SBL/GR/CCL- RUN t, S' ATLAS 7-t5 6-~0-9t CCL-PERF~ RUN t, S' Al'LAS . 9-6 6-i6-~i _ LEAK DETECTIO~ RUN t, 2'CS' CAMCO ~-8 6-5-9i PERFORATION BREAKDOW~ RUN t, S' CAMCO ~-9 6-22-9i COLLAR-PERF-- RUN t, S' Al'LAS ** 9-i0 4-t7-~t INJ PROFILE.~ RUN t, 5' CAMCO 9-i8 6-i5-9i JEWELRY~ RUN t, S' CAHCO 9-~ 6-t4-9t LEAK DETECTIO~ RUN t, 2' CAMCO ~d~* 9-40 6-t2-9i INJ F'ROFILE~ RUN t, S' CAHCO ~~-47 6-8-9i DATA FRAC TEHF'~ RUN t, S' CAHCO *~ ii-5 4-i7-~t LEAK DETECTION~ RUN t, ~' CAMCO ti-5 6-t2-9i PROD PROFILE~. RUN t, ~' CAMCO ~ t i -22 7-t -9i PDK--t O0/GR/CCL-BORAX~ RUN t, ~' ATLAS t2-t2 6-t6-9i LEAK DETECTION~ RUN t, 2'~5' CAMCO i~-iS 6-i7-9t INJ F'ROFILE~ RUN t, 5' CAMCO **** i~-i6 6-i7-9i INJ F'ROFILE-- RUN t, 5' CAHCO i6-i6 6-i3-9i INJECTION/F'RODUCTIO~ RUN t, 5' CAMCO tT-i 6-i6-9i PRIS~ RUN t, S' ATLAS i7-tt 5-8-~i LEAK DETECTIO~ RUN t, 2'~5' CAMCO PLEASE SIGN A~~F(~'~~URN.. ~ r~THE ATTACHED COF'Y.A$ RECEIPT OF DATA HAVE A 'NICE DAY! SONYA WALLACE AT0-i529 DISTRIBUTION CENTRAL FILES CHEVRON EXTENSION EXPLORATION EXXON MARATHON MOBIL P H I L L I P S F'B WELL FILES BPX STATE OF ALASKA TEXACO * CORRECTED LOG INTERVAL FOR 9-6 I£ 6?88-??88 ** REFERENCE MIX UP ON TRANSMITTAL 9tt59 - POSSIBLE *** CORRECTED LOGGED INTERVAL FOR 9-4~ IS i395t-t425i **** CORRECTED API~ FOR i3-i6 IS 58-829-2~82~ DUPLICATE LOGS P,,O. BOX i()()S6() A N C H 0 R A (; Ii"_', A L.. A ;~! K A 9 9 5 i () DA'TE' 6 .... 27-9 Rli."r:li!:F;:.lii:NCli.": AI:;:CO CASED HOI_E I:-'INAL.~:.' t -.. 9 6 .... t 2.... 9 t F:' E R F."-C 0 !... I... A R R I.J Nt , 5 ' ~ -2.5 & .... t 2'"'9 t F'Ii'-RF"'"'C;[]I..i...(~I;~ ',, F:UN ~ , 5" :3'-' '7 6 .... 1 t - 9 t F:' F C':'"' C; R ( F'A C K [".': R S E T'T' I N I.'; ) ' R U N t , 5" ~. "1 S ..... I '7 & - t 0'- 9 t F" F R t"- C 0 L I...~.., k R U N t 5 ' :3 .... i 7 & ..... I 8 '" 9 t A CS Ii': I...'"' V D t... '"' C; R R U N t , 5" 4 "- 9 6 '"' 9 "-'? t .~(' F' I N N Iii R ( H I T H '1" E i'i F' ) R U N t , 5 ' * ~;; ..... t8 6 .... i4-9t F:'ERF'-'COI...I...AR RUN t, 5" ~ "~ 'e t F:' D g t 0 0 / C C !._---(; R R L.I N t 5" ii .... i:3 ,,,, -,~ "". -' , t:3 .... 98 6...":2..-9t CNI... '--F:':F:'ITHEI:~NAI... RUN :~6, .., ~ :3-98 4.:,.-.o.-9'. ~.... . t CNi... "- 'FHERHAI... I;,'iJN :'~6, 5 ' "~; c'. t ,:. "'- ,- 8 6-" t 3"'- 9 ~ D ]: T--E R U N S 6, 5 ' "l ,i t4-t':) ~ .... '7-9t F'IT2 F, UN t 5' PI_EASE: J~'l(:~i"~ AND REI'LJRN THE ATI'A.,HED COF'Y AS' RECEIPT OF DATA, HAVE: A NICE I)AY~ ..',,' 0 N Y A WALI...ACE A"I"C) .... ~ 529 AF'F'ROVEI) 'I'F;:AN.S':P,- 9t 2~2 DISTRIBUTION CENTRAL. FLEES CHEVRON D & M EXTENSION EXF:'LORAT ION EXXON HARAI'HON MOBIL '"' I:'H IL.L IF'$ 'ir F'B WELL FILES R & D -.-'"' .BPX " $1'Al'E OF ALASKA 'Ir TEXACO * I'FIE CC)RRECI'EI) AF:'I$ FOR 9--t8 IS ~O-n"~c~--~"~o.,~ ,,,.~, ~.,,,~...,, ALASKA . AND GAS CONSERVATION CC IISSION APPLICA, ION FOR SUNDRY APPROVALS 1. Type of Request: STATE OF ALASKA 2. Name of Operator ARCO Alaska, Inc. Abandon Suspend Operation shutdown , Re-enter suspended well , Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Vadance Perforate X 5. Type of Well Development Exploratory Stratigraphic Service 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 Othe'r 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 9-18 9. Permit number 77-39 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, T10N, R15E, UM At effective depth 1338' FSL, 4150' FWL, Sec. 1, T10N, R15E, UM At total depth 1353' FSL, 4088' FWL, Sec. I T10N, R15E, UM 9450 feet 9199 feet Plugs(measured) None 12. Present well condition summary Total depth: measured true vertical None Measured depth 101' 2713' 9432' True vertical depth 101' 2713' 9181' RECEIVED Effective depth: measured 9371 feet true vertical 9122 feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 258 sx AS II Su dace 2685' 13-3/8" 5500 sx AS cmt Production 9404' 9 -5/8" 1000 sx Class G & 180 sx AS I Alaska Oil & Gas Cons. C0mmissic Anchorage Perforation depth: measured None (Post workover) true vertical None (Post workover) Tubing (size, grade, and measured depth) 7-1/2" / 5-1/2", L-80, tbg w/tail @ 8821' Packers and SSSV (type and measured depth) Camco 'BaI-O' SSSV @ 2203', Baker 'HB' csg pkr @ 2160' & 'FB-I' pkr @ 8705' Description summary of proposal X Detailed operations program BOP sketch X. 13. Attachments 15. Status of well classification as: Gas Suspended Water Injector Date Approval No.q 14. Estimated date for commencing operation June 1991 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. signed'l'%~.~,v,,,~.~ ~.~, ~.L-_. ~(~.~;,w--~ Title Senior Area Engineer FOR COMMISSION U~E ONLY Conditions of ~proval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ~ ~Cc~ O~I~INAL SIGNED BY __~~~ Approved by order of the Commissioner LONNIE O. SMITH ~-~Commissioner feet Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DS 9-18i PROPOSED PERFORATIONS APl # 50-029-20259-00 PERMIT # 77-39 ARCO Alaska, Inc. proposes to add perforations in DS 9-18 within the Sadlerochit Sand from the Prudhoe Bay Unit. The proposed perforation intervals are as follows: BHCS (Ref.) Footage Flow (11/16/77) ('MD) SPF Unit Zone 8935-8950 15 4 Zulu 4 9080-9111 31 2 Victor 2 9259-9267 8 4 Lower Romeo 1 9276-9290 14 4 Lower Romeo 1 Well 9-18 is a produced water injector. The wellbore fluid present when the perforations will be shot is water. The expected bottom hole pressure is 3650 psi. All wireline work will be done through a 5000 psi WP BOP/lubricator, tested to 1.2 times the maximum expected surface pressure (diagram attached). 4 3 1 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRE:LINE RAMS (VARIABLE ,SIZE) 5. 5000 PSI 4 1/6" LUBRICATOR 4. ,5000 PSI 4 1/6" FLOW TUBE PACK-OFF H I REL I NE BOP EOU I PHENT iii III MEMORANDUM State of Alaska ALAS KA OIL ~ GAS CONS ERVATI ON COMMI S S I ON TO: Lonnie CSm Commissioner DATE: May 26, 1991 FILE NO: AAI 9 - 18 THRU: TELEPHONE NO: SUBJECT: BOPE .... ~ .... Inspection AAI PBU DS9-18 Permit No. 77-39 Prudhoe dOil Pool FROM: Doug Amos Petroleum Inspector Wednesday MaY 23. !991: I traveled this date from Anchorage to AAI's PBU Dsg-18 well to conduct a BOPE walk-thru inspection on AUDI workover Rig No.4. As the attached AOGCC BOPE Walk-thru inspection form indicates, I found item 16 not in-compliance. I discussed this problem with AUDI rep Jim Gafney and he called his warehouse representative and was informed that the HCR valve could not be repaired locally and had to be sent to Houston Texas to be rebuilt. The valve is scheduled to be back on location by 6/5/91. I requested that Jim try to find a loaner valve until he recieved his original valve but he was unable to locate a valve that would fit his 3000# stack. The flare and vent line were installed and will be operational as soon as the HCR valve is installed. The manual valve needed to complete the flare/vent line system is currently being used in place of the HCR valve on the BOPE stack choke line. In summary, I conducted a BOPE Walk-thru inspection at AAI's PBU DS9-18 well on AUDI Rig No. 4. I found item 16 on the inspection form not in compliance . The HCR valve is being rebuilt and will be installed on or before 6/5/91. Attachment. 02-00lA (Rev. 6/89) 20/11/MEMO1.PM3 OPERATION: Drlg. Operator Location: Sec Drlg contr /~?~J Location (gan'l) 1.() 2.() 3.() 4.() S.() 6.() 7. ( ) Sl:ATk 'OF"ALASKA ALASKA 01L AND GAS CONSERVAT i ON COHM I SS i ON BOPE Walk-Thru Inspection Report 8. (~)' () 9. (~)'~ ( ) ~o. (~7~ ( ) il. (~ ( ) 12. (~ ( ) 13. (~-- ( ) 14. (~)'~' ( ) ~s. (~F-~ () ~6.() IN COMPLIANCE; yes no n/a A. DIVERTER ( ) (~ line sz & length ( ) (~ line conn& anchored ( ) (b~ bifurcated & dwn wind ( ) (~/90° targeted turns ( ) ( ~/vlvs: auto & simultaneous ( ) (~f~annular pack-off ( ) (~condition B. BOP STACK ( ) wellhead flg wkg press ( ) stack wkg press ( ) annular preventer ( ) pipe rams ( ) blind rams ( ) stack anchored ( ) chke/kill line sz ( ) 90° turns targeted (chke & kill In) (V~ ( ) HCR vlvs (chke & kill) 17. (~ ( ) 18. (~4 ( ) ~9. (~¢'- ( ) 20. (;~"~" ( ) 21. (~)~' ( ) 22. (~() () 25. ( ) 26. (~ ( ) 27. (~ ( ) 28. (~,,~- ( ) 29. (~ ( ) 3o. (~_ ( ) 31. ([~ ( ) 32. (L~' ( ) ( ) manual vlvs (chke & kill) ( ) connections (flgd, whd, clmpd) ( ) drl spool ( ) flow nipple ( ) flow monitor ( ) control lines fire protected C. CLOSING UNITS ( ) wkg press ( ) fluid level ( ) oprtg press ( ) press gauges ( ) sufficient vlvs ( ) regulator bypass ( ) 4-way vlvs (actuators) ( ) blind handle cover ( ) driller control panel ( ) remote control panel IN COMPLIANCE; yes no n/a 33. (b~ ( ) ( ) firewall 34. (~ ( ) ( ) nitrogen power source (back-up) 35. (b~() ( ) condition (leaks, hoses, etc) D. MUD SYSTEM 36. (~/)~ ( ) ( ) pit level floats installed 37. (~ ( ) ( ) flow rate sensors 38. ("')/ ( ) '( ) mud gas separator 39. (~ ( ) ( ) degasser 40. (~)~ ( ) ( ) separator bypass 41. (~ ( ) ( ) gas sensor 42. I~_,/ () ( ) chke In conn 43. ( ) ( ) trip tank E. RIG FLOOR 44. (~ ( ) ( ) kelly cocks (upper,lower,IBOP) 45. (W)~ ( ) ( ) floor vlvs (dart vlv, ball vlv) 46. (~ ( ) ( ) kelly & floor vlv wrenches 47. (~/'~ ( ) ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) 48. (v~ ( ) ( ) kill sheet up-to-date 49. (~f'~ ( ) ( ) gas ~etection monitors (H-S & methane) 50. I~_.~( ) ( ) hydr chke panel 51. ( ) ( ) chke manifold F. MISC EQUIPMENT 52. ( ) (~ ( ) flare/vent line 53. (t~)~ ( ) . ( ) 90° turns targeted (dwn strm choke Ins) 5,+. () 55. (~F'- ( ) 56. (~r~ () ( ) reserve pit tankage ( ) personnel protective equip avail ( ) all drl site suprvs trained for procedures ( ) H2S probes ( ) rig housekeeping 57.(~ () s8. (~r~ () RECORDS: Date of last BOP inspection:/~~/~/ Date of last BOP test: ~ /~/ Non-compliances not corrected & why: ..t. o.. o io...ill oomp .d, BOP test & results properly entered on daily record? C.0013 (rev 04/29/91) Inspector STATE OF ALASKA ALAS~,A OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing ~ Repair well Change approved program_ Operation Shutdown _ Re-enter suspended well _ _ Plugging _ Time extension _ Stimulate _ Pull tubing X Variance _ Perforate _ Other ~( WORKOVER 2. Name of Operator ARCO Alaska, Inc, 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, T10N, R15E, UM At effective depth 1338' FSL, 4150' FWL, Sec. 1, T10N, R15E, UM At total depth 1353' FSL, 4086' FWL, Sec. 1, T10N, R15E, UM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) RKB 54' 7. Unit or Property name Prudhoe Bay Unit 8. Well number 9-18 9. Permit number 77-39 10. APl number 50-029-20259 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical 9450' feet Plugs (measured) None 91 99' feet Effective depth: measured 93 71 ' feet Junk (measured) None true vertical 91 22' feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 258 sx AS II 1 01 ' 1 01 ' Surface 2685' 1 3-3/8" 5500 sx AS cmt 2713' 2713' Production 9404' 9-5/8" 1000 sx Class G & 9432' 9181' 180 sx AS I Perforation depth: measured None open to production RECEIVED true vertical None open to production F E B 2 0 ] 9 Tubing (size, grade, and measured depth J~l$..~J~_.0jl ..~ GaS C01~s, CI~.~I~$SI~, 7-1/2" / 5-1/2", L-80, tbg w/tail @ 8821' I,~:i. ~ch0ra~a Packers and SSSV (type and measured depth) ' Camco 'BaI-O' SSSV @ 2203', Baker 'HB' csg pkr @ 2160' & 'FB-I' pkr @ 8705' 13. Attachments Description summary of proposal ~ Detailed operation program ~ BOP sketch 14. Estimated date for commencing operation February 25, 1991 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil w Gas __ Suspended _ Service , Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Drilling Analyst FOR COMMISSION USE ONLY Date IConditions of approval: Notify Commission so representative may witness Plug integrity_ BqP Test_ Location clearance__ Mechanical Integrity Test ~ Subsequent form require Approved by the order of the Commission ORIGINAL SIGNED BY Form 10-403 Rev 06/15/88 I.,ONNIE C. ~MIIH IAppro~ al, No. 10- //cZ/: A,.,,.,roVed OoP~/ SUBMIT IN TRIPLICATE DS 9-18 WORKOVER SUMMARY PROCEDURE AND TIME ESTIMATE 1. Remove SSSV. 2. Install pump-out plug in "XN" nipple at 8809' 3. Shoot circulation holes in tubing just above packer located at 8705'. 4. Install BPV. 5. Test 9-5/8" casing to 3500 psi. R'ocedure MIRU Workover rig. Note: Est. BHP = 3660 psi @ 8800' SS (8.0 ppg Equiv.); WO Fluid = 8.5 ppg filtered seawater. 2. PulIBPV. 3. Circulate filtered seawater down tubing and completely around annulus. 4. Install BPV. 5. ND tree, NU and test BOP. 6. MU landing joint and POOH with 7" x 5-1/2" tapered tubing stdng. 7. RIH with mill and PRT. Mill and retdeve "FB-1" packer and tail pipe. 8. RIH with 8-1/2" junk mill and dean-out fill/junk down to +/- 9390'. 9. Run an 8.5" gauge ring and junk basket on E-line to PBTD (+/- 9390'). 10. Set cement retainer at +/- 9100' on E-line. 11. 12. RIH with 2-7/8"tubing cementing stinger on 3-1/2" DP and squeeze perforations below retainer. Pull up out of retainer and continue pumping cement for a balanced plug to cover perforations above the retainer. POOH 20 stands. Reverse circulate 10 bbl seawater to dear DP. Squeeze away +/- 25 bbl or until squeeze pressure of 500 psi or more is obtained (not to exceed 2000 psi). 13. POOH with cementing stinger. 14. RIH with 8-1/2" bit and clean-out to cement retainer at +/- 9100'. 15. Test squeeze to 500 psi. Re-squeeze if necessary. 16. Continue to dean-out cement retainer and cement down to landing collar. 17. Test squeezed perforations to 500 psi. Re-squeeze if necessary. 18. Run and cement 7" liner to isolate pmveously perforated interval. 19. Clean-out 9-5/8" casing with bit and scraper down to TOE 20. Close BOP and pressure test TOL to 3500 psi. POOH. 21. RIH and dean-out 7" liner down to landing collar. 22. Close BOP and pressure test liner to 3500 psi. POOH. 23. RIH with new 9-5/8" "FB-I" packer and tailpipe assembly on drill-pipe; set same +/- 100' above TOE 24. POOH and lay down drill-pipe. 25. RIH with Iocator seal assembly, new 7" IPC tubing and SSSV nipple. 26. ND BOP's. Install tubing head and tree and pressure test same. 27. RD and relaease rig. Total Time Estimated = 15 days 13-5/U" 5000 PSI BOP STACK ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING HEAD 2 1. 13-3/8" CASING HEAD 2. 5000 PSI TUBING HEAD 3. 13-5/8" - 5000 PSI PIPE RAMS 4. 5000 PSI DRILLING SPOOL 5.13-5/8" - 5000 PSI BLIND RAMS 6.13-5/8"- 5000 PSI PIPE RAMS 7. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY,.TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. DAM 11/20/89 BOP SCH (FOR: NAB 2ES) STATE OF ALASKA ALAS OIL AND GAS CONSERVATION ,VIISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate Other X 6. Datum of elevation(DF or KB) 54' RKB 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development . Exploratory Stratigraphic Service X 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 1116' FEL, Sec. 2, T10N, R15E, UM At effective depth 1323' FSL, 1170' FEL, Sec. 2, T10N, R15E, UM At total depth 1353' FSL, 1194' FEL, Sec. 2, T10N, R15E, UM 8. Well number DS 09-18 9. Permit number 77-39 10. APl number 50 - 029-20259 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9450' feet 9199' feet Plugs(measured) None Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured 9371' feet true vertical 9122' feet Junk(measure,~ Spinner Tool @ 9360' MD Size Cemented ~'~C,~ - Measured depth Length 101' 20" 258sxA..~'-.'~.~.~, ~*O..~ e~ 101' 101' 5500 SX A~'. ~ '/~O~ 2713 271 2713' 13-3/8" ,~,~¢~. ~ ~ 9432' 9-5/8" 1000 SX C,'G'-'~' ~~. 9432' 9181' measured All prior pealed inte~als are squeeze, however, Inj. Profile (8/3/89) shows following inte~als taking fluid: 8935'-8950'; 8982'-9002'; 9126'-9142'; 9170'-9177'; 9228'-9241" 9259'-9267'; 9276'-9292' true ve~ical NO pealed inte~als. (leaking peals from 8699' - 9046' TVD as noted above) True vertical depth Tubing (size, grade, and measured depth) 7", 26#, L-80, IPC, from 0 - 4154'; 5 1/2", 17#, L-80, IPC, from 4154'-8821' Packers and SSSV (type and measured depth) HB casing packer @2160'; Baker FB-1 Packer, @8705; Camco BaI-O 7" SSSV Nipple, @2203' 13. Attachments Description summary of proposal X. Detailed operations program BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: Continue on H20 injection only - Per Verbal Notice (attached) Oil Gas Suspended 16. If proposal was verbally approved Mike Minder 12/19/89 Name of approver Date approved Service WAG Injector 17. I hereby certify that the ~correct to the best of my knowledge. Signed Title Operations Superintendent FOR COMMISSION USE ONLY Cond~hons of approval: Notify Commission so representative may witness Date 10/28/90 Plug integrity BOP Test Location clearance I Approval No F~ .. ~)~,~' Mechanical Integrity Test Subsequent form required 10- Approved by order of the Commissioner Form 10-403 Rev 06/15/88 ' David D. Smith PRB-24 659-5102 ORIGINAL SIGNED 8¥ LONNIE C. sMITH Commissioner Approved C, cpy SUBMIT IN TRIPLICAT~ DATE: TIME: INJECTION WELL ANNULAR COMMUNICATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 1 2/1 9/89 0935 hrs NOTIFIED BY: Terry Fuller Julie Heusser - AOGCC CONTACT: Mike Minder 279-1433 REASON'. Injection Well 9-]8 Annular Communication Per Rule 7 Requirements of Area Injection Order No. 4 DISCUSSION: WAG well 9-18 has tubing X 9 5/8 communication when the well is on miscible injection. The 9 5/8 annulus pressure tracks normal WAG injection pressure of 2500 psi. When the 9 5/8" annulus is bled back, it builds at a rate of 75 psi/hour up to an estimated 2200 psi within 24 hours. Well was shut in on 12/9/89 for a 13 3/8 MIT to 2000 psi. On 12/14/89, the 9 5/8' annulus was successfully MIT'd to 2000 psi. ARCO plans to switch the well to seawater injection and continue to monitor the pressures. No additional work is planned unless a leak to water is identified. ,,,, AOGCC RESPONSE: Fill out Form 403 Sundry. Attach summary of history and proposed plan. Submit to C.V. Chatterton. Sundry Notice Req'd at this time.? YES X Production Support Superintendent Orig: cc: Heusser/Vacant, Annular Communication Engineer, PRB 24 Massey/Vacant, Production Support Supt, PRB 20 Wilder/ Kennedy, Sr Wireline Supv, PRB 20 Ferguson/Farmer, Area Field Eng, PRB 24 Robertson/Clark, FSi2 DS Supvervisor Cavin/Beaudry, FS82 Superintendant Nickerson/Burrough, FS#2 Supervisor Sanders, DS#9 Surveillance Engineer (12/13/89) TEST PRESSURES TBG TIME TBG / 9-5/8" / 13-3/8" pKOFF 9-5/8" PKOFF PRIOR TO PRESSURIZING INITIAL TEST PRESSURE © O 0 O 0 O HRS / / HRS / / HRS / / HRS / / FINAL TEST PRESSURE AFTER BLEED DOWN o, //~'~OHRS /0 r-/O I /r>O0 I ;;L~ O 0 FINAL PRESSURE DATA TIME: /(~ 30 HRS WELL STATUS: FLOWING / INJECTING / SHUT IN TBG /o~0 PSI 9-5/8" SSSV CONT/BAL LINES 5q00 TBG HNGR TEST PORT CAVITY: 9-5/8" TEST PORT CAVITY: /o00 PSI ~8o0 PSI PSI PSI ANNULAR COMMUNICATIONS TEST t WELL# ~ - / ~ TYPE OF TEST: SPECIAL INSTRUCTIONS: INITIAL PRESSURE DATA TIME: /~/;00 HRS (ARIVIAL ON LOC.) TBG /o ~/G PSI 9-5/8" SSSV CONT/BAL LINES ~CJOO / 38oo PSI TBG HNGR TEST PORT CAVITY: ~ PSI FLUID BLED: j~/?~ ~].~Z.af 9-5/8" TEST PORT CAVITY: O PSI FLUID BLED: ~//y~J~:: fi',/~_,'_4/ WELL STATUS: FLOWING/FI~TIN~/) SHUT IN /rJOo PSI 13-3/8" V~. PSI BLED TO 0 PSI? BLED TO 0 PSi? ~ pRE-TEST PREPARATIONS- - TBG BLED F/ N,/~ PSI TO ~',/~ PSI TYPE OF FLUID AND VOLUME BLED: TUBING LOADED WI ~,/~ BBLS CRUDE + 9;5/8" ANNULUS BLED Fi /DDO PSI TO /V,/~ BBLS DIESEL '(~00 PSI TYPE 9-5/8" 13-3/8" TYPE 13-3/8" OF FLUID AND VOLUME BLED: ~o.,~, ,~,'e.'.~.l / B/~L LOADED W/ /V,~0 BBLS CRUDE + ~ BBLS DIESEL ANNULUS BLED F/ /]/,# PSI TO /~.~- PS1 OF FLUID AND 'VOLUME BLED: LOADED W/ /1/,/~ BBLS DIESEL- ARCO AL. A2KA., ZNC., P, 0, BOX 'i 0(')S6'?,' ANC:HORA(iE, At_A2K~ 995'i0 D A T E · '? --:3,3, --- 90 R Ii:' F FL F:. E N C E ' A 1::.: C 0 C A 2 E D H 0 L [ii F' ! N A L :5: '2 '- 2 6 '? ...... "'~- .-- 9 0 F' F..' 0 "" ~:: "~-Z,-9":; PRODU[::'f'ION F'F..'OI':.Ei._E F.:Ur,! i., :':'"' ~.,.._ v. "" ,i 9.":; l... '4 - i S '7 "- 7 ... 9 ;.?: 9 .... i ('3 ,"-6 9 i:'~ -, - · ...... L.. I 0 i"--i i::' R C! i::' ]-' L. iii: 9 -.32 7 - 'i 'i -- 5;' ,::::, F:' !:;..' 0 D U C "1" c,_ :..' ~::, 7' - ~ ':-:' .... '~:;' ,"-", ;. ..j ..~ .... ., ..,, 'i, 1'2 - 'i "2 '? - 'i 9,_ .... c.:,.. ::"..: i::' i:;.'. 0 }":' iJ C ]" 'i 2. "- 5 ......... 6 7 -,.'ii, -'::." ;:'"- 'i 6"-22 7'-4-90 f:-l;.'. COL. L. AR I;.'.t. jh! 'i., 'i 6- :'"z..::,':' 7 .... :3 ....... - 90 'i 8- i 'i '7 .... :3'-9 (:',' L. E fi i'.': D F' T iiE C. T I 0 N /F' Z ","' £ i:;.'. U ['".} i., 5 F:'!_ E A E.: .E S ]: 6 N A N T:: i:;:. E T U R N T i-i E A'i" 'i" A C i'-t E. D C 0 ~ Y A :::.: Fi: E: C E ]: F' T 0 F' D A "1" A., F::. E C E :[ V ED B Y ............~.~T_~"__............_ ........ H A V E: A N ]1 C Ii-: D ¢':', Y ! D l $ T fi'. :1: B U T ]: 0 N · ~' CEN TF:.AL t:ILEY "",,- C H E 'v' i:;:.., ri N . D & i'i '" E X T E N 2 ~ 0 N E'X F' t_ 0 t:('. A 'f' I 0 N '11' . · " ~:'x'XON · tt' ~ ...... MARATHON · "' H fi B :[ I_ ~ F' I'-i r t.. L i F' 2 'Ir .~. , -- . 'i I" ¢' I::' f.:: 14 [ii t... I_.. F' ] ...... :. ,::. R & D .,~. BF'X · ¢- ;~'f' R 'i" I= 0 F' A L R,5; K A T E XACO ARCO AI_ASKA, ];NL";., F'. 0. BOX i ,~,'-336;'3 ANCHORAGE, ALASKA 99~'_,i() DATE · 6/2¢,/9,3 ARCO CASED HOLF F'INAL$ i -":' ~-~--"-~,q 9;:; F'l:::Oi)llr':Tlrii~! F'RriF]:L.E SLJRVE:,Y R~IN i ":'" :.:~ _.:- ..~ ~... "- ,.. ........... : ...' °-2 6-,'5-~;:, TEMPERATURE t_(](~ RI..IN.. i ..,~" 9-4 6-3-9C) TEHPERAi'URE LOG RUi'.! i , 5" - ~'" "' ". "'I t "- ~'~ o ,:~ ,-':',-~'~-9,::') TI.:EMFE'R~-~t..I.,..E ,SURVEY RIIN i · ....' ..... 9-6 6--3--9,.'b I"EHPERATL~r-~:E ,S'URVE'{ RUN i., 5." 9--o, 6-',a-o,'-'',, , ... TEFiPEI-i:ATIJF~'Ii: LOC. RIJN. . t., .,.':~'" o_.. i i ~A-4-o,':',, ... TEHF'IERATLIRE LOG.. RL.IN t , ...,:." 9-i 8 6-4-9¢, TEiqF'ERA'TUI;,'E SURVEY RUN g .... P(:) A-.S--?¢:, "I"EMF:'EF;.'ATiIF:I:: kO[~ RI]N i ':~ .... .... ............ 9-'24 6-4-9;3, TIEMF'ERA TUi~.'IE SURVEY RUN c,. .... ,,.":, .,.=:,4.. - a, - o, 6) .... 1' E H P E R A 'Y' U R E L 0 G R U N i i2-4A LS-S,:.')-':?G). LEAK DETr-'C'TZON, .... I~,'UN i, '~'"; i~,-.- ...... ,. .;.-._~-.- ~':~-c,;:~ ....... TEHP/SF']]i'4. NF'R G/L. SURVEY RUN i, C A H C: 0 C A i",i C 0 C: A M C [' C A H C O C A H C 0 C A i'.i C: 0 C: A i',i C ('J C A M C 0 C A H C 0 CAMCO C A iq C 0 PLEASE SIGN AND RETURN THE A'f'TACHED COPY AS I;:IECEZF'F OF: DATA. F:.'.li-'_ C [-:, Z V E: D BY REC ~:FZ-~- NICE DAY! JUN ~ 2 1990 E F' Alactm 0il & Gas Cons. CommiS$io~ :::.'AL.L.Y HOF'F'FCK ... '.. A T o - i.~ ~'= 2 ?.' Anchorage AF'F'ROVE:D~ 'i' R A N S '~- o, ,q.. '),.. ,_'-~ ,_,z, DISTRIBUT]:ON ~.,. CENTRAl_. FILES ~. CHFZVRON ;O & Pi .:~: EXTENSION ..... ' r ', E^F L ORAl" l ON · .'"'EXXON MARATHON · ~ MOBIL F' H :[ I_ L I F' S F'B WELL FILES R & D -f,: BPX STA'¥E OF ALASKA TEXACO F' ~ ~-:' A "." ~-: .E: i "- i',.; A N D F..' E T LJ R N T H E A T T A C H E D C O P Y A £ R !ii: C E I i:' T O F' D A T ~':~: i... i... ~--, 1,:- L.. ~..':': .. . · ,~ HAVE ANTr'i=. ,....,_ DAY'! MAR -8 !990 SALLY ~:" ;'; '::' ':' '::' '-' '"' ~': '~'~ ...... : ........ Al~k~ Oil & Gas ¢o~8. ,, ,...- -~-om~W-~ '''~ F' ~::' ~:;.'. O V ~. ~.':, A '¥ O .... 4 ":'~ (:~ "f R A N S :~- ,::~ ;':-~., c.:,/; ' '" '='" Anchorage D I S i' R I B U'T' ]: 0 N ~: CEN i' F,.'.AL I:iL. IES' ql: C l.-i E ".," t70 N D & M ~i: EXTENZION EXF'LORATION :~ EXXON MARATHON !~ MOBIL ARCO ALASKA, INC. P~O. BOX t0~360 ANCH(]RA6E, ALA£KA 995t 0 DATE:' '8-22-89 REFERENCE' ARCO CASED HOLE FINALS t-iA 8-t2-89 CET-THI[;KNES'5' RUN ~, 5' i-iA 8..- t 2---89 CORR, F'ROTECTION EVAL. RUN t, '2' ~-t9 8-J3-89 COLLAR/PERF RUN J, 5' 4-6 8- ~ ~-89 COI_LAR RUN 4-6 8-~ ~-89 BRIDGE PLUG RUN 5-J ~ 8-~4-89 DIFF, TEMI:' RUN 5-t ~ 8-~ 4-89 CNL-GAMMA RUN -5-~ 8 8-~ 8-89 CET RUN 9-~ ~ 8-2-8o INJECTION F'ROFILE RUN ~ 5' 9-~8 8-~-89 INJECTION F'ROFILE RUN ~, 5' 9-~9 8-4-89 INJECTION PROFILE RUN 9-25 8-4-89 INUECTION PROFILE ,- RUN t, 5' --~-27 7-2-89 DUAL SPACED NEUTRON RUN ~6'-~ 8-7-89 INJECTION PROFILE RUN ~7-5 8-9-89 COLLAR/F'ERF RUN ~, 5' ~8-~ 8-5-89 TEMP/WHUT ~'URVEY RUN ~, 5' F'LEA~'E ~IGN AND RETURN THE ATTACHED COPY AS' REC;EIPT OF' DATA ~CH ~'CH ATLAS' A'I'I_AL~ ATI...A3~ ATI_A;~ A'¥LA~' ,?CH CAMCO CAMCO CAMCO CAMCO HLZ CAMCO ATLA~' CAMCO RECEIVED BY CENTRAL FILES . ~ F'HII_LIF'$ CHEVRON F'B WELL FILES D & M R & D EXTENSION EXPLORATION ~ BF'X EXXON ~ STATE OF ALASKA MARATHON ' ~ TEXACO MOBIL THE CORRECTED API$ FOR 5-tt I$ 50_0-~,~9_?0o52 THE CORRECTED AF'I~ FOR 9-t9 I$ 50-029-2r326r~, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION __ --REVISED REPORT OF S NDRY WELL OPERATI I , , - 1. Operations performed: Operation shutdown Stimulate J~ P~ugging ~ Perforate ~ Pull tubin~ ~'~ ~ $ WORKOVER ARCO Alaska~ Inc. 3. Address P.O. Box 1003,60~ Anchora~e~ AK Alter Casing ~E Other ~ 2. Name of Operator 5. 6. 99510-03,60 4. Location of well at surface 7. Datum elevation (DF or KB) EKB 54 ' Unit or Property name Prudhoe Ba~/ Unit Well number Feet 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, T10N, R15E, UM At effective depth 133,8' FSL, 4150' FWL, Sec. 1, T10N, R15E, UM At total depth 1353' FSLm 4086' FWL~ Sec. 1, T10N, R15E, UM 11. Present well condition summary Total depth: measured 9450'MD true vertical 9199'TVD 9-18 8. Approval number 9. APl n~umber 50-- Q?q_?f)?Scf 10. ~ol Pru~hoe Bay 0il Pool feet Plugs (measured) None feet Effective depth: measured 93,71 'MD true vertical 9122 'TVD feet Junk (measured) feet Spinner tool ~ 9360' Casing Length Size Conductor 80' 20" Surface 2685' 13,-3/8" Production 9404' 9-5/8" Cemented 258 sx A5 II 5500 sx Arcticset 1000 sx Class G & 180 sx AS I Measured depth 101 'MD 2713, 'MD 943,2'MD True Vertical dept~ 101 'TVD 271 3 'TVD 9181 ' TVD Perforation depth: measured true vertical None open to production None open to Production Tubing (size, grade and measured depth) 7"/5-1/2", L-80, tbg w/tail ~ 8821' Packers and SSSV (type and measured depth) HB casing pkr ~ 2160', FB-1 pkr ~ 8705' & Bal-O 555V ~ 2203' RECEIVED AUG 2 8 t989 Alaska 0il & Gas Cons. Commission Anchorage 12. Stimulation or cement squeeze summary Intervals treated (measured) Perfs f/8935~-9292' Treatment description including volumes used and final pressure 70 bbls 12% HC1 & 450 sx Class G 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or .Iniection Data. OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments (Workover Well History w/Addendum, dated 2/25/88) Daily Report of Well Operations ~ Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 ~/ Title Associ ate Engineer (Bani) SW03,/67 Date '~-I1-~ Submit in DUplicate STATE OF ALASKA .... 0 R !C ~ ~ /~ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION PLETION OR RECOMPLETION REPORT AND LOG /( 11 ~=1,,I, YVIIII"I.,"= · 1¥11 vn nl.¥¥llll------ · ·v·~ -m~- ,~'-- - --- 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~1 Water Injector 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 77-39 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20259 4. Location of well at surface 9. Unit or Lease Name 642' FSL, 224' FWL, Sec.1, T10N, R15E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1256' FSL, 4164' FWL, Sec.1, TION, R15E, UM 9-18 At Total Depth 11. Field and Pool 1353' FSL, 4086' FWL, Sec.1, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 54'I ADL 28327 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No. of Completions 11/03/77 11/17/77 12/1/77'I N/A feetMSLI Single 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey i 20. Depth where SSSV set I21.Thickness°fPermafr°st 9450'MD/9199'TVD 9371 'MD/9122'TVD YES [~ NO [] 2203' feet MD 1900' (approx) 22. Type Electric or Other Logs Run BHC/DIL/GR~ FDC/CNL/GR/CAL, CNL/GR/CCL, FDL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ,, 20" 94# H-40 Surf 101 ' .% f)" 258 13-3/8" 72# MN-80 Surf 271.~' 17-1/?" 5RR~O ~× Ar-ct~¢ set 9-5/8" 47# F -80/S00-95 Surf 94_%2 ' 1 ?-1/4" 1000 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5%" 8729 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED Perts f/;~935'-9292' 70 bbls 12% HC1 & 450 sx C]ass None open to Production 27. PRODUCTION TEST , Date First Production Method of Operation (Flowing, gas lift, etc.) 3/8/78 Future I niector Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCr WATER-BBL CHOKE SIZE IGAS'OILRATIO N/A TEST PERIOD I~ I , Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCr WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None * NOTE: Perforated well 2/16/78. Workover performed and perforations stimulated and squeezed 3/28/88. (Dani) TEMP3/106 Submit in duplicate ('~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ', 30. , GEOLOGIC MARKI~F~S FORMATION TESTS -.. NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadl erochit 8934' 8698' N/A 0WC 9322 ' 9075 ' Base Sadlerochit 9330' 9083' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge · Associate Engineer INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 O&TF' &-iT-fiR ~,-:':.,',,/F. ,-~, i-..~'rF:.!~ T.',,.'.,V, ~ .IIIIX, I_ ~ 7' ]988 p,::- ,--- ,-....,, .,.-:, r..-- i~.j H F T"f,'Alaska 0il & Gas Cons. Commission ~ . i.-¢ I ? ,..-.; T r",- '~ -"'; :.". ,::.-, Anchorage . t'r: ~..~l.J .... .... :%~.-..... :- T) l' :,-', T F..' T ',"---~ I t 'f,' T f'~ .IL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMk .SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~. Alter Casing]~ Other 2. Name of Operator ARCO Alaska_. tnc. 3. Address P.O. Box 100360, Anchorage~ AK 99510-0360 4. Location of well at surface 642' FSL, 224' FWL, Sec. 1, TION, R15E, UM At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, TION, R15E, UM At effective depth 1338' FSL, 4150' FWL, Sec. 1, T10N, R15E, UN At total depth 1353' FSL~ 4086' FWL, Sec.. 1, T10N~ R15E, UH 11. Present well condition summary Total depth: measured 9450'MD true vertical 9199'TVD Stimulate ~ Plugging ~ Perforate ~ Pull tubing W0RKOVER 5. Datum elevation (DF or KB) RKB .SLf ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 8. Approval number ~-71 9. APl number 50-- 10. Pool feet feet Plugs (measured) None Prudhoe Bay Oil Pool Feet Effective depth: measured 9371 'MD true vertical 9122'TVD feet feet Junk (measured) Spinner tool ~ 9360' Casing Length Size Conductor 80' 20" Surface 2685' 13-3/8" Producti on 9404 ' 9-5/8" Cemented 258 sx AS II 5500 sx Arcticset 1000 sx Class C & 180 sx AS I Measured depth 101'HD 2713'MD 9432'MD True Vertical depth 101 'TVD 271 3 'TVD 91 81 ' TVD Perforation depth: measured None open to production true vertical None open to production Tubing (size, grade and measured depth) 7"/5-1/2", L-80, tbg w/tail @ 8821' Packers and SSSV (type and measured depth) HB casing pkr @ 2160', FB-1 pkr @ 8705' & Bal-0 5SSV @ 2203' 12. Stimulation or cement squeeze summary Intervals treated (measured) Perfs f/8935'-9292' Treatment description including volumes used and final pressure 70 bbls 12% HCI & 4_50 sx Class G 13. Representative Daily Average Production or Injection Data N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation Subsequent to operation Tubing Pressure 14. Attachments (Workover Well Hi story w/Addendum, dated 2/2.5/88) Daily Report of Well Operations [~ Copies of Logs and Surveys Run '-~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 ~ Title Associate Engineer Date (Dani) SW03/67 Submit in Duplicate~...~ ARCO Oil and Gas Company Daily Well History- Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data, in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. PRUDHOE BAY FIELD l iAccounting cost center code District ICounty or Parish State ARCO Alaska, Inc. I NORTH SLOPE - PRUDHOE BAY AK Field ]Lease or Unit IWell no. I ADL: 28327 DS 9-18 I Tit~e WORKOVER Auth, or W.O. no. ASl959 Operator ARCO 1A.R.Co. Spudded or W.O. begun ~Date I ACCEPT API: 50-029-29259 W.I. 'rrotal number of wells (active or inactive) on this Icost center prior to plugging and I 22. 0000 Jabandonment of this well IHour I Prlor status if a W,O. 03/13/88 J 1300 I Date and depth Complete record for each day reported as of 8:00 a.m. POOL 102 03/29/88 ( 1 TD: 9450 PB: 9371 SUPV:CD RIG RELEASED MW: 8.5 SEAWATER CONTINUE TEST CONTROL LINES. TEST TUBING TO 2500 PSI. TEST ANNULUS TO 2000 PSI. SET BPV. ND BOP. NU TREE. TEST TREE TO 5000 PSI. PULL TEST PLUG. ATTEMPT TEST TUBING TO 3000 PSI. SHEAR OUT SUB BLEW 8 2900 PSI. BLEED PRESSURE TO 0 PSI. SET BPV. CLEAN PITS. RELEASE RIG @ 2400 HRS 3/28/88. DAILY:S220,154 CUM:$1,043,180 ETD:S1,043,180 EFC:$1,262,000 Old TD New TD PB Depth Released rig Date Kind of rig Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data ~/ell no. Date Reservoir Producing Interval Oil or ga~Test time Production -' Oil on test Gas per'day Pump size, SPM X length Choke size TiP. C.P, Water % GOR Gravity Allowable Effective c~a~e corrected __ The above is correct IDate ITiUe '~_ For form preparation and/'/~istribution, see Procedures Manual, ~:~ection !0, Drilling, Pages 86 and 87. AR3B-459-3-C ASSOCIATE ENGINEER Number all daily well history forms consecutively as they are prepareci for each wel . Dlvltlofl of AtlantlcRIcMte~lCo~pany ARCO Oil and Gas Company g~, Daily Well History--Interim Inatructione' This form is used during drilling or workover operations, If testing coring, or perforating, show formation name in describing work performed. Number ail 'drill stem tests sequentially. Attach descript on of a cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers.and following setting of oil string until completion. District Field Date and depth as of 8:00 a,m. County or Parish ARCO Alaska, Inc. NORTH SLOPE - PRUDHOE BAY Lease or Unit PRUDHOE BAY FIELD DS 9-18 Complete record for each day while drilling or workover in progress 03/21/88 ( TD: 9450 PB: 9371 SUPV:RO 03/22/88 ( TD: 9450 PB: 9371 SUPV:RO 03/23/88 ( TD: 9450 PB: 9371 SUPV:RO 03/24/88 ( TD: 9450 PB: 9371 SUPV:RO 03/25/88 ( TD: 9450 PB: 9371 SUPV:CD IState AK .o) .1) IWell no. POOL 102 PACK IN THE 9-5/8" X 13-3/8" ANNULUS. POOH WITH CUTTER. DAILY:S41,928 CUM:$321,921 ETD:S321,921 EFC:$1,262,000 TIH WITH BACK-OFF TOOL MW: 8.5 SEAWATER MU TRI-STATE SPEAR AND SPEAR 9-5/8" CASING. PULLED CASING WITH 140,000#. POOH WITH 9-5/8" CASING. MU 12-1/4" BIT AND SCRAPER. TIH TO 2190'. REVERSE CIRC. @ 2190'. POOH. MU RTTS AND FINGERS. TIH. TESTED ANNULUS TO 2000 PSI. ATTEMPTED TO OPEN LOWER FO. CIRCULATED @ 3 BPM WITH 200 PSI. CLOSED FO. POH. MU TRI-STATE BACKOFF TOOL AND TIH. DAILY:S32,028 CUM:$353,949 ETD:S353,949 EFC:$1,262,000 ND BOPE'S MW: 8.5 SEAWATER RIH W/ BACK OFF TOOL. BACK OFF CSG AT 2216'. POOH. LD DC. TIH W/ SPEAR. BACK OUT STUB. POOH W/ STUB AND LD SAME. FILL PIPE SHED W/ 9-5/8" CSG. MU SKIRTED SCREW IN SUB AND BOT PKR. RUN 53 JTS OF 9-5/8" CSG W/ FS AT 9432' AND FC AT 9389'. TIH TO 2216'. SCREW INTO CSG. TEST TO 500 PSI. OK. ND BOPE'S AND PREP TO SET SLIPS. DAILY:S92,039 CUM:$445,988 ETD:S445,988 EFC:$1,262,000 POOH W/ RTTS MW: 8.5 SEAWATER SET 9-5/8" SLIPS. CUT OFF CSG. INSTALL PACK OFF. NU BOPE'S. TEST PACKOFF AND BOPE. INSTALL WEAR BUSHING. BREAK DOWN TRISTATE BACK OFF TOOL. MU RTTS AND TIH AND OPEN FO AT 2525'. RU DOWELL AND BATCH MIX 180 SX CMT. ATTEMPT TO REVERSE OUT & PUMP DOWN DP W/NO SUCCESS. DAILY:S68,063 CUM:$514,051 ETD:S514,051 EFC:$1,262,000 SET BOT PACKER MW: 8.5 SEAWATER POOH. LD CMTD 5" DP. CLEAN FLOOR. RIH W/ "DP. POOH LD. CHANGE RAMS TO 3-1/2". INSTALL WEAR BUSHING. RIH W/ 8-1/2" BIT & 9-5/8" SCRAPER. CIRC BTMS UP. POOH. PU FO CLOSING AND OPENING FINGERS WITH RTTS. TIH. OPENED TOP FO @ 2402' ESTABLISHED CIRC. RIH. OPENED BOTTOM FO @ 2525'. POOH. CLOSED TOP FO. RIH. SET RTTS @ 2474' W/FO CLOSING FINGERS @ 2515'. ESTABLISHED CIRC. THRU BOTTOM FO. PUMPED 175 BBLS ARCTIC PACK AND 180 SX ARCTIC SET I. DISPLACED W/20 BBLS WATER. ATTEMPT TO SET BOT OPEN HOLE PACKER DAILY:S35,374 CUM:$549,425 ETD:S549,426 EFC:$1,261,999 TEST SQUEEZED PERFS MW: 8.5 SEAWATER SET OPEN HOLE PKR. DID NOT SET. RESET SAME. TEST TO 3000 PSI. OK ABOVE AND BELOW. CLOSE BOTTOM FO. REVERSE CIRC AT 2555'. POOH. LD RTTS. PU 8-1/2". TIH. TAG CMT AT 8830' DRLD HARD CMT AT 8830' TO 9090'. REVERSE CIRC. TEST SQUEEZED PERFS AT 8935' TO 9088' TO 1400 PSI. OK. DAILY:S44,319 CUM:$593,744 ETD:S593,744 EFC:$1,262,000 Signature ~ rat,on ~dis~t~ib~ut'i? ~ '; //'4~ - For form prepa ' ~ (' i ' -- - see Procedures Man~l~ection 10, Drilling, Pages 86 an~87 IDate ITitle j_.5- ~kG ASSOCIATE ENGINEER AR3B-459-2-B Gas Cons, Commis;,:: . ,,~'~rt~%ell hi,tory, ........... tiveiy as they are prepared for each well. ARCO Oil and Gas Company Daily Well History--Interim Instru¢lione: This form is used during drilling or workover operations, If testing coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores, Work performed by Producing Section will be reported on "lnlerla" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "lnlerlm' sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District I~County or Parish I Stat Field Lease or Unit PRUDHOE BAY FIELD DS 9-18 Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a.m. POOL 102 03/26/88 ( 1 TD: 9450 PB: 9371 SUPV:CD 03/27/88 ( 1 TD: 9450 PB: 9371 SUPV:CD 03/28/88 ( 1 TD: 9450 PB: 9371 SUPV:CD REVERSE CIRC. SEAWATER W/C-193 MW: 8.5 SEAWATER DRILLED EZSV & CMT FROM 9090'-9300' CIRC. TO BALANCE FLUID. POOH FOR BIT. CHANGED BIT & TIH. CUT AND SLIP DRILLING LINE. CONTINUED TIH. DRILLED ON JUNK FROM 9300'-9304'. DRILLED JUNK AND FILL FROM 9338'-9358'. CIRCULATED @ 9358' PBTD. REVERSE CIRCULATED TO CLEAN HOLE. TESTED SQUEEZE PERFORATIONS TO 1400 PSI. BLED DOWN TO 500 PSI IN 30 MINUTES. UNABLE TO ESTABLISH INJECTION RATE. REVERSE CIRCULATE SEAWATER TREATED WITH C-193 CORROSION INHIBITOR. DAILY:S29,645 CUM:$623,389 ETD:S623,389 EFC:$1,262,000 LD 3-1/2" DRILL PIPE MW: 8.5 SEAWATER REVERSE CIRC. SEAWATER WITH C-193. POOH. UNLOADED PIPE SHED. MU 9-5/8" FB-1 PACKER & TAILPIPE. TIH WITH PACKER ON DP. SET PACKER @ 8700' DPM. TESTED PACKER & 9-5/8" CASING TO 2000 PSI - OK. POOH & LD 3-1/2" DP. DAILY:S39,259 CUM:$662,648 ETD:S662,648 EFC:$1,262,000 TEST TBG HANGER/CONTROL L MW: 8.5 SEAWATER CONTINUED POOH LD 3-1/2" DP. PULLED WEAR BUSHING. CHANGED RAMS TO 5-1/2" & TESTED DOOR TO 1000 PSI. RU & RAN 5-1/2", 17#, L-80, TUBING & 7", 26~, L-80, IJ4S, TUBING. SPACE OUT. MU FMC GEN I 13-5/8" X 7" RETROFIT TUBING HANGER. TESTED CONTROL LINES TO 5000 PSI. DAILY:S160,378 CUM:$823,026 ETD:S823,026 EFC:$1,262,000 A,~chcmge Well no. The above is correct Signature /4, I Date I For form preparation ar)d/distribution see Procedures Manua4 ,Section 10, Drilling, Pages 86 and~'a'7 Title ASSOCIATE ENGINEER AR3B-459-2-B JNumber all daily well history forms consecutively as they are prepared for each well. WeH~--Initial Report - Dally Inltmelle~.-p~l:im'~aad submit the "lnililt Rel~ff" on tho first Wednesday altm a well is spudded or workover operatlonl ar~"ltart~d. Daily wor~ prior to spudding should be summarized on the form giving Inclusive dates only. District ARCO Alaska, Inc.. Field PRUDHOE BAY FIELD Auth. or W.O, no, AS1959 Operator ARCO ICounty, parish or borough NORTH SLOPE - PRUDHOE BAY Lease or Unit ADL: 28327 Title WORKOVER API: 50-029-20259 Spudded or W.O. begun ACCEPT IDate 03/13/88 Date and depth as of 8:00 a.m. I Stat~.K DS 9-18 I~ve,, no. 03/14/88 ( TD: 9450 PB: 9371 SUPV:CD 03/15/88 ( TD: 9450 PB: 9371 SUPV:CD 03/16/88 ( TD: 9450 PB: 9371 SUPV:CD 03/17/88 ( TD: 9450 PB: 9371 SUPV:RO 03/13/88 ( TD: 9450 PB: 9371 SUPV:RO 03/19/88 ( TD: 9450 PB: 9371 SUPV:RO 03/20/88 ( TD: 9450 PB: 9371 SUPV:RO Complete record for each day reposed POOL 102 I ARCO W.I, IPrior status if a W,O. IHour J 22,0000 1300 TESTING BOPE MW: 8.5 SEAWATER MOVED RIG FROM DS 9-6 TO DS 9-18. RU DS 9-18. ACCEPTED RIG @ 1300 HRS, 3/13/88. RU LINES TO KILL WELL. LAY HARD LINE TO KILL TANK. PULLED BPV. CIRC. SEAWATER ON CHOKE. SET BPV. ND 5-1/2" TREE. NU 13-3/8", 5000 PSI BOPE & TESTED. DAILY:S51,982 CUM:$51,982 ETD:S51,982 EFC:$1,262,000 TIH, PU 3-1/2" DP MW: 8.5 SEAWATER TESTED BOPE TO 5000 PSI - OK. PULLED BPV. LD TUBING HANGER. CIRCULATE BOTTOMS UP. LD 201 JTS 5-1/2" TUBING. CHANGED RAMS TO 3-1/2". INSTALLED WEAR BUSHING. PU BHA & TIH. SLIP DRILLING LINE. TIH - PU 3-1/2" DP. DAILY:S33,958 CUM:$85,940 ETD:S85,940 EFC:$1,262,000 POOH WITH PACKER MW: 8.5 SEAWATER CONTINUED TIH. MILLED OVER AND LATCH FISH. ROTATED K-ANCHOR FREE. SPOTTED HEC PILL. POOH WITH FISH. LD FISH. MU BHA. TIH. MILLED ON PKR @ 8610'. POOH WITH PACKER. DAILY:S26,330 CUM:$112,270 ETD:S112,270 EFC:$1,262,000 POOH W/ SCRAPPER/BOOT BAS MW: 8.5 SEAWATER POOH WITH PACKER. LAY DOWN COMPLETION ASSEMBLY AND FISHING TOOLS. MU RTTS AND TEST FO'S AND CASING. POOH WITH RTTS. MU BHA AND TIH TO 8954'. CBU. POOH. DAILY:S42,071 CUM:$154,341 ETD:S154,341 EFC:$1,262,000 RU DOW FOR SQUEEZE MW: 8.5 SEAWATER POOH WITH SCRAPER. MU RTTS AND TIH TO 8855'. TEST CASING TO 2000 PSI. BLEED OFF TO 1760 AFTER i HOUR. POOH WITH RTTS. RU DA AND RIH WITH 8.50 GR/JB. COULD NOT GET PAST 8970'. RIH WITH 8.45 GR/JB TO 9270'. RD DA. MU RTTS STINGER. PU 28 JTS 2-7/8" TBG AND TIH. CUT DRILLING LINE. FINISH TIH. RU DOW TO ACIDIZE AND CEMENT SQUEEZE. DAILY:S44,675 CUM:$199,016 ETD:S199,016 EFC:$1,262,000 POOH . /~%O MW: 8.5 SEAWATER RU DOWELL. ACIDIZED AND SQUeeZED OFF PERFORATIONS AT 8935'-9292' W/70 BBLS HCL & 2~0, SX CLASS G CMT. RD DOWELL. POOH. LD 2-7/8" TUBING. MU 8-1/2" BIT BHA & TIH. TAGGED CMT ~ 8828' CIRC. BOTTOMS UP. POOH. DAILY:S80,977 CUM:$279,993 ETD:S279,993 EFC:$1,262,000 POOH, LD CUTTER (9-5/8") MW: 8.5 SEAWATER POOH. MU RTTS WITH OPENING & CLOSING FINGERS. TIH TO 2535'. TESTED CASING TO 2000 PSI. TESTED FO. OPEN FO @ 2525' & EST. INJECTION RATE. POOH WITH RTTS. CHANGED RAMS T© 5". MU TRI-STATE CUTTER. TIH. CIRCULATE OUT SEA WATER WITH DI~L_ CUT 9-5/8" CA~IN~ ~ 2200'_ ~I~C_ OUT ~CTIC The above is correct For form preparation and distributIj6'~ see Procedures Manual, Section Drilling, Pages 86 and 87. AR3B-459--1-D Number all daily well history forms consecutively as they are prepared for each well. iPsge no. ADDENDUM WELL: 2/21/88 DS 9-18 RU lubr. RIH w/10' perf gun, 3-3/8", 4 JSPF, 120° phasing, perf 9079'-9089', POOH. MU 4-3/8" jet cutter, RIH to 8560'; ti stuck @ 8515'. Cut tbg @ 8515'; ti free, POOH. Rec'd all of running tl except 8" piece of 1-11/16" connecting rod. RD DA. Secure well. ~ Drill~Supervisor~ ~a~e AR{'~O ~I...¢,.~KA, INC, P. O, BOX ANCHOR. AGE. AI...A..~I(A DATtT ' LT-25-88 .... RFiF:'EREi',,IF.;E' ARCO CA.~ED I--tOI..E F'T. WAI 6.-.- 9 ;.r, -'- t 8--I~ R F'R F!I}I.IC Ir' Ii ('l N -? -- 2 iq 2; - t 5 - 8 8 {:: F l' 9- t 8 :.~ -- t 7 --. F1 .q C Fl l.. 1. A I:i' ~ .4-,.A? Z-I 9--..R. R [:lnl. I. Al.?/I::'FPFFIRAT'[f'lkl t F! .-~ 4 7~-- ~ '7 -~- F-.18. r; III. I.. A P / P F I-7 F' t]R A T '[ fi K! F;;I!N t "~" RI IN ~ ~';" F-;.'I INi %" 1711N i "~, ' R'l IN. I %" F'I E:A,~E S'TI;N ~ND RF'T'URN 'THE A'T"¥Ar'.I-IFT~ EFIF'Y ¢~.~ FclTP. FTF'T t-IF Anchorage F' F f;,f;; Y t:.', F. I9 N I~-.-. 'T' T ATO-t '5.'.>9 D T X' T F,' T N I T T f-I kl .? C I-I .? fi Iq A TI. A,? ATI f.';ENTF,'AI... F:'T '-~ CHE-VRON [---X"T'EiIg,c', !' f]ig E'XPI f'tF, iA'¥ T I'IN · ~' F' X' W' f] fg -~- .... MARATHON :II.- M C) ~ T t.. ARf';f] Al. AS'gA, TNC, ANCHF. IRAr.~Fi , AI...A S'K A hATE F: F:; F' E R Fi N C E ' A R C 0 CAS'lEI) HOI..[!i F:'ligAl.. C O1...I.. A r-;: / F'E R F' 0 F.' A 1' I [iN C{II.. I...AR/F'FRF'OR'AI' I ON fT, l")l.../.. A R/P E F: F O R l' TON COl.. I AR/PF.'TRF'FIRAT T C[.')I...I...A R F'I. FA.~E 21gN AND REI"IIRN 7]H~ rA~'llA~V'~~]F"T'~/~0~'~ ~~ HAVE' A NICE DAY '~ ~aska 0il & Gas Cons. Commission Anchorage F'I::' f; [; Y I~ENNFTT ATO-t 529 'T'F?AK/S' ~:88t90~ APF'R'OVED ....... DT 2'¥R T F~I Il" T FIN RI.IN t, RIIN 4, RI.IN 1, RIIN I, RI.IN t, OF' DA'FA., 5' ATI. A.~ ATI. A.~ ATI. ATI ATLAS CE't',~TRAI._ F T CHF'VRON. DAM F~TF'N,~TON FXF'I. ORATION MARATHON MOBIL F'HTI. I. IF'S' F'R WELl FTI ~ 2AF'F.'. $ STATE rlF' AI..ASKA -,-'" TEXACO 0 P~ STATE ANNUL~ TESTING DA TAI~A,~E FOR PRUDHOE/LiSBURNE ;N. IECT/ON WE].LS 1988 AHNULAR TESTS TUltlI~G PACKER TEST LAST TEST WElL ANNULLIS FLUID SIZE ~ D'/TVD' CASING PRESS. DATE ...... 11 11 -- ~ _ i i i i ~1 i i ii ii i ! fl _1 -- 11 ii i _ 1-~ , i L ~ I I I I II II II1 ........ jill ~ __ --~ iiii __ ~.$ ~ _~r~bbl,,d!~ +, !0.4 ~ ,6-1/,2,," . !0_487/7B3.4.. 9:.5z8', 47#,_ MN-Co .... 1.5.0.0 _. 1/8/88 1,2-2 "' ...t:)~1 ....... ' , ?" 1 _1..._673/~6464 9-5/8.',..4?#,. L-80 ........... 3064 2/28/88- [ ,a7 ,---, + . .. . ........................................ : ........... / * .............. g-5/8, 47#, L-80 N~CC lo 2200', N-BO 1o 7084' 2493 3/30/88 , d~_.~,,+ 9.5 NaCI * 6705-8482 " _... 9,18 51 ~ ~ ...... - ............ -9.~'9'~_ ' 98,_h~:,dkM~e1+ 8.5,,NaC~ ... 5-1/2." !..1.0.5.1/8668 .9-5/8", 47l:., S.00-95.._te .~,~.2.(Y~.H~O 1o~--~".r _ _25.6,5 , .: 2/!,!/8a' ,. .. -~,: + 8.6 NaC! 5- 1 /2- ......... · 1.6-.1, 6 ,~ 76 ~ ~4 ~< ... 9626/.6.+38 9-5/8', .4.7. t, _.L-8.O ............. 2423 _ . .L2..10 '~ D~ci ......... 2-?/8" .... 9569f8575 .... 9-~8', 47.~, L-BO ...... 3t04 3,/.6.~8 .-. ~_~:1..6 ~ .68,_h_~_ ~:.--,~._~..~,8.5,NaCA. ,_ 3-t/2: .. 10293~8535 . 7-5/e", _..29.7~.' L-SO 2508 3/6/88 :L2..-24.~ _ .Cp.~L~ ........ 2-?/8: ........ 9541:)/8506 i 9-5/1~',. 47#,. L-80. ............. 28t5 .3./2.9./8.8 ... N. Gi,6 . 51 ~ d~ + 9-4 N;~Ct ,. 7" 80661742,...6.... 9-518", _47!, MN.-80 ......... 1950 2/8/8.8, .... __ **7' ~, 415,3', 5-1/2' below Page 8 Revised 4,~14,'88 STATE OF ALASKA ALAS,._. OIL AND GAS CONSERVATION COMk _,SION APPLICATION FOR SUNDRY APPROVALS Abandon ~ Suspend [] Operation Shutdown ri... Re-enter suspended well ~ Alter casing 1. Type of Request: Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing ~ Amend order ~ Perforate [] Other~,. 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. RKB 54' feet 3. Address 6. Unit or Property name P. 0. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit 4. Location of well at surface 642' FSL, 224' FWL, Sec. At top of productive interval 1256' FSL, 4164' FWL, Sec. 1, At effective depth 1338' FSL, 4150' FWL, Sec. 1, At total depth 1353' FSL, 4086' FWL, Sec. 1, 11. Present well condition summary Total depth: measured true vertical 1, TION, R15E, UM Effective depth: T1ON, R15E, UM TION, R15E, UM T1ON, R15E, UM 7. Well number 9-18 8. Permit number 77 -39 9. APl number 50-- 029-20259 10. Pool Prudhoe Ba7 Oil 9450 ' MD feet Plugs (measured) None 9199 ' TVD feet measured 9371 'MD true vertical 9122 ' TVD Length Size 80 ' 20" 271 3 ' 1 3-3/8" 9432 ' 9-5/8" Pool feet Junk(measured) Spinner tool Ca 9360' feet Cemented Measured depth True Vertical depth 258 sx AS I I 101 'MD 101 'TVD 5500 sx Arcticset 2713'MD 2713'TVD 1000 sx Class G 9432'MD 9181'TVD Casing Conductor Surface Production See attached sheet Perforation depth: measured true vertical See attached sheet BOP sketch Tubing (size, grade and measured depth) 5-1/2", 17#, L-80 plastic coated tubing ~ 8592' Packers and SSSV (type and measured depth) Otis "ROM" SSSV t~ 2140'MD_: Baker "SAB" 12:Attachments Description summary of proposal ~ Detailed operations program [] 13. Estimated date for commencing operation February 15, 1988 Date approved 14. If proposal was verbally approved Name of approver 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed (¢~~ .~~ Title Associate Enqiq~r ~ Commission Use Only ( DML/JG ) Conditions of approval Date 5A3/50 Notify commission so representative may witness I Approval No. ~ [] Plug integrity [] BOP Test [] LoCation clearancel ~_~.' ~-~.~,~.~ .~.~Approv~ Copy ........... ~ Returned ~ by order of ORIGINAL SIGNED BY Commissioner the commission Date Approved by Form 10-403 Rev 12-11..~NIE C. SMITH 4i.~,-q-') Submit in triplicate DS 9-18 APPLICATION FOR SUNDRY APPROVALS Block 11. Perforations' MD 8935 -8950 8982 -9002 9O20 -9038 9126 -9142 9170 -9177 9186 -9190 9209 -9218 9228 -9241 9259 -9267 9276 -9292 TVD 8699 -8714 8745 -8764 8782 -8800 8885 -8900 8927 -8934 8943 -8947 8965 -8974 8983 -8996 9013 -9021 9030 -9045 SA3/50a 1/15/88 APPLICATION FOR SUNDRY APPROVAL PBU DS 9-18i DRILLING PROCEDURE 1) MIRU, ND, NU, test. 2) Kill well with seawater. 3) Retrieve Baker PBR. 4) Pull/mill Baker SAB packer. 5) RIH with RTTS and FO closing tool. Test casing to 2500 psi. 6) Cement squeeze entire perforated interval. POOH. 7) RIH with RTTS and test squeeeze to 2500 psi. 8) Circulate 2300' diesel cap. 9) RIH, mechanically cut 9-5/8" casing at 2236'. 10) Pull 9-5/8" casing. 11) Roundtrip 13-3/8" scraper and 12-1/4" bit to 2236'. 12) Test Arctic pack to 2000 psi. 13) RIH, backoff 9-5/8" casing collar at 2258'. POOH. 14) RIH, recover 9-5/8" casing collar. POOH. 15) Run new 9-5/8" NSCC casing with external casing packer. 16) Circulate oil base mud down annulus. 17) Screw into Buttress 9-5/8" casing with NSCC casing. 18) Test 13-3/8" x 9-5/8" annulus to 2000 psi. 19) Set external casing packer. 20) ND BOPs, install slips, cut casing, install packoff, NU and test BOPs. 21) RIH with RTTS, FO opening and closing tools. Test FOs and 9-5/8" casing to 2500 psi. 22) After leak is reconfirmed, open FO, squeeze FO, close FO, POOH. 23) RIH drill/clean out cement to lower FO. -2- 24) Test squeeze and casing to 2500 psi. 25) RIH and clean out to top of fish at 9350'. 26) Test perforated interval squeeze to 1000 psi. 27) RIH with 9-5/8" packer and tailpipe on DP, set, POOH and LDDP. 28) Test 9-5/8" casing and packer to 2500 psi. 29) RIH with new 7" tubing. 30) Freeze protect well, ND, NU, test, release rig. Anticipated bottomhole pressure: 3800 psi Completion fluid: 8.5 ppg seawater DML/2a 1/13/88 ANNULAR PREVENTER PIPE RAMS 5 BLIND RAHS I I TUBING HEAD . 6 7 8. g, 1. t3-3/8" CASING HEAD 2. 9-5/8" CASING HEAD 3. 5000 PSI TLIBIN6 HEAD 4. 13-5/8" - 5006 PSI BLIND RAMS ~,._,. I~-~./R" ..... - =0._,.00 PS~ PIPE RAMS 6. 13-5/8" - 5000 PSI ANNULAR lO, 1t. 12, t3. 14. ACCUMULATOR CAPACITY TEST 1 . CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID, 2, ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3, OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT iN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD, TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES, INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS, I ,"" ~ , ,N~REA~E PRESSURE TO 50,:)0 PSI A,~.~D HOLD FOR t0 MINUTES CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES, BLEED DOWNSTREAM PRESSURE TO ZERO PSi TO TEST VALVES, TESTPEMAINING LINTESTED MANIFOLD VALVES. iF ANY. WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM, BLEED SYSTEM TO ZERO PSI, OPEN PiPE RAMS. BACK. OFF RiJNNING JTAND PULL OUT OF HOLE, CLOSE BL!HD ~,~r.~,,~,,~ AND ~q~, ~., ~'"~ .,; 50qO. PSI FOR. ~0, MINUTES. BLEED TO ZERO PS!. OPEN BLIND RAMS AND RECOVER TESTPLLIG. MAKE SLIRE MANIFOLD AND LINES ARE Fi_ILL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. TEST STANDPIPE VALVES TO 5000 PSI. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. RECORD TEST !NFORMATiON ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRiLLiNG SUPERVISOR. PERFORM COMPLETE BOPE ~EST ONCE A WEEK AND FUNCTIONALLY OPERATE BORE DAILY. dG NOVEMBER 21 , 1986 ARC(]} ALASKA, IN[;,. F'.,O, BOX iOOf;60 ANCHOF;.'.AC, E, A[..A[?KA 995~ ¢-) DATli:". ' i °-"~4-87 REEF'IERENCE- ARCO CASED HOLE I-':']~NAI... 9-t D t 2-7--87 ? - t t 2 -'--'.5 -- 87 2-9 1 6-t t 2-t 4-87 I... _F. A N P I.-.-. T/,%' F' 7r N / T E M F' F'I.J H F- .... 1ti N / T E; H .r.:' F'I IMF'- I ?,,I/'TF..t~F' C; A I.. ! F:' FI R RI. IN t .,.'2" F?IJN 't '5 ' 171IN I '5' :;'.t IN t 5;" F't...E~,..cF.. ,?IGN AND REI'I..IRN THE ATTACHED COPY AS RI?CF:]I;F'T NF' DATA, Ir,'. E' C E-.i I V F.. D B Y _ .................... .~... HAVE A NTCI:T DAY,/ ..... ':!. PEggY BENNETT ATO-t 529 TRAN$ g P F' F,'. 0 V E I) ................ .._~ D .]7. ,?TR T BI.IT i'~ A H f': [I .r..'. A H F; r'i CIE N 'T' I-7. CHEVRON · EXTEN,~Ti]N EXF'I..OR'AT.TON EXXON MARATHON MOB ARC() ALASKA, F', O, BOX 1 ANCHORAC, E, ALASKA DATE' i2-22--87 REFERI~ilNCE: ARCO CA,S'EI) HOI...E FINAl... '~ 6-17 t57-t t-8'7 '"" 9-6 t 2-1 2-87 ~9-t8 t2-tt-87 F'I...EEASE SIGN AND RI~I.IFJ~J~J~iJ~,~Tj~CHED [i~Y AS RECEIPT OF DATA. HAVE; A NIC, E DAY fU~sT<aOii & gas Cons. ColrirrlJsSJoll AnchOrage F'EGF., Y BENNETT ATO-t 529 TRANS $B7697 ~ AF'F'ROVED DISTRIBL!'F I FIN ,~CH $ CENTRAl... FILES ~ CHEVR[IN D & H $ EXTENSION EXF'LORATION ~'~ EXXON MARATHON '" MOB I L. PHI I...L.I PS F'B WELl._ FILES R & D SAF'C STATE OF ALASKA TEXACO ARCO Alaska, In¢ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F, Scheve Operations Engineering Manager December 11, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 Subject: DS# 9-18 Permit No. 77-39 Dear Mr. Chatterton' Attached is the Application for Sundry Approval as required per Rule 7 of Area Injection Order No. 4 for the above referenced well. Very truly yours, D. F. Scheve Attachment CC: Standard Alaska Production Co. L. L. Gantt, ATO 1520 H. G. Limb/G. D. Herring, PRB 24 J. W. Groth, ATO 1570 P. S. Pierce/E. W. Skaalure, PRB 20 Pl(DS#9-18)W1-3 RECEIVED ~nchor~ge ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany A[t3B 6132-0 STATE OF ALASKA ALA,.,,~A OIL AND GAS CONSERVATION COI,..,~ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well E-J Alter casing F_~ Time extension [] Change approved program [] Plugging [] Stimulate El Pull tubing [] Amend order [] Perforate E~ Other Name of Operator ARCO Alaska, Inc. Address P. O. Box 100360, Anchorage, AK 99510 Location of well at surface 642' FSL, 224' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1256' FSL, 1116' FEL, Sec. 2, T10N, R15E, UM At effective depth 1323' FSL, 1170' FEL, Sec. 2, T10N, R15E, UM At total depth 1353' FSL, 1194' FEL, Sec. 2, T10N, R15E, UM 5. Datum elevation (DF or KB) 54' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-18 8. Permit number 77-39 9. APl number 50--029-20259 10. Pool Prudhoe Oil Pool feet 11. Present well condition summary Total depth: measured true vertical 945O 9199 feet feet Plugs (measured) None Effective depth: measured true vertical 9371 feet 9122 feet Junk (measured) Fill - 9289' (8-7-87) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True Vertical depth 75' 20" 2687' 1 3-3/8" 258 SX 101' 101' 5500 SX 2713' 2713' 9406' 9-5/8" 1000 SX 9432' 91 81 ' measured true vertical 8935'-8950', 8982'-9002', 9186'-9190', 9209'-9218', 8699' - 9046' 9020'-9038', 9126'-9142', 9170'-9177', 9228'-9241', 9259'-9267', 9276'-9292' Tubing (size, grade and measured depth) 5-1/2", 17#, L-80, Plastic Coated, 0-8604' 4-1/2", 12.6#, L-80,, Plastic Coated, 8604'-8719' Packers and SSSV (type and measured depth) Baker SAB Packer @ 8592' MD Otis ReM SS~V~,blippl~e ~i~. ~1.~0~ ,-~VlD 12.Attachments Description summary of proposal ,~ [~J~(~ ~p~r~'i(~rogram [] BOP sketch [] 13. Estimated date for commencing operation N/A 14. If proposal was verbally approved Name of approver Mike Minder Oil & Gas C, ons. Commission Date approved 12~07/87 15. I hereby,~certify tJ:lat3he foregoing is true and correct to the best of my knowledge Signed 2¢.)¢,~,~/~...~~ Title Operations Engineering Manager D ate / ~////IF '7 Commission Use Only Conditions of approval Approved by ORIGINAL SIGNED BY LONNIE C. SMITH Form 10-403 Rev 124.85 Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Returned Commissioner Approval No. by order of the commission Date/,._.~,) -~/;,~Q-~..?.~ Submit in triplicate INJECTION WELL ANNULAR COMMUNICATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 DATE: TIME: NOTIFIED BY: REASON: 1 2/07/87 1315 hrs Pam Pierce AOGCC CONTACT: Mike Minder Injection Well 9-18 Annular Communication Per Rule 7 Requirements of Area Injection Order No. 4 DISCUSSION: Identified leak from tubing to 9-5/8" casing at base of seal assembly inside PBR. Circulation was established from the tubing to 9-5/8" casing. Unable to establish circulation from 9-5/8" to tubing. Annulus will hold 2000 psi. Requested permission for continued injection until able to work over. Leak was identified with temperature and spinner logs. AOGCC RESPONSE: Approval given for 1 week temporary injection continuation with formal request required for subsequent to 1 week injection. Sundry Notice Req'd at this time? YES X NO~ SIGNED: PRODUCTION SUPPORT SUPERINTENDENT Original to G. D. Herring/H. G. Limb - PRB #24 cc: Production Support Superintendent (P. Pierce/E. W. Skaalure) - PRB #20 Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) - PRB #20 Field Area Operations Engineer (J. D. Ottoson/T. G. Zibell) - PRB #24 DS Supervisor - FS # FS Superintendent - FS # DS Engineer- ATO /5_Ro ( 1 2- 1 0- 8 7) INJECTION WELL ANNULAR COMMUNICATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 DATE: /,2 .- 0 7- ~ 7' TIME. /&/~" NOTIFIED BY: P/q ~1 ]?.~,e,e"- AOGCC CONTACT: I~jection Well q../r~ Annular Communication per Rule 7 Requirements of Area Injection Order No. 4 REASON' DISCUSSION' AOGCC RESPONSE: Sundry Notice Req'd at this time? YES X' NO SIGNED: PRODUCTION SUPPORT SUPT. DS Supv. Sr. Well Supv. FS Supt. Field Area Ops. Engr. Annular Comm. Spec. Verbal No t. -A OGC C ARCO Almskm, Inc P,O. Box t00360 Anchormge, A DATE: August 3t, t987- REFERENCE: ARCO Case~ HO~ ~rla[ t-29 8--8-8? -Prod, F:'rofi le i-SO 8-9--8? F'rod, Profile t--gt 8-.9-87 l."-'rod, F:'rof i Le t-S~ 8-.10-87 F'rod, F'rofi Le t'--~3 8-.~-87 F'rod, I::'rof i Le 3-9 8-~ 6-87 l'emp, Log 3-t~. '~ 8-8-87 In j, F'rofi Le ~--t8 8-6-87 Inj, F'rofi te ,~.-.-~.~ 8--~6-87 F'rod, F'rofi Le ~---S~ 8--t0-87 bR/Temp/F'rod, F'r'ofi te Survey 4..-~ 8--~6-'87 F'rod, F'rofi Le 4--6 7/3~.-8/t/87 Leak l)e'l',/'Femp/Ftowmet'er 4....27 8-6.-.-87 In.j, F:'rofi Le/Temp,/F'Lowmeter 4-L¢2 8-~6-87 F'rod, F'rofi I.e 5....2 8/~ .... 2/87 Leak I)et/Temp, Log 7 - 2 g 8 -- ~ 2 - 87 F' [ o w m e '1' e r 9-~ 8-t'7-8'7 X-Y CaLiper - 3 8- ~ S --8 '7- F' r o d, F' r o f i [ e 9- 8 8 -7.-- 87 I n j, F:' r o f i L e / T e m p, / I::' L o w m e $ e r 9 .... f8 8-7.-8'7 Inj, F:'r'o'fi Le/Temp,/FLowmeter 9- 3 ~ 7- ''~ ?- 87 F' r o dF:' r o f i L e ~ '2..--20 8- 5- 87 I n ~, F' r o f i I. e Run Run Run Fi:un Run R. un Run Run Ir(un Run Run Run Run Run Run Run Run Run Run & .5' & 5' and return the at!'ached copy as receipt of data, C 8 ffl C 0 C a m c o C 8 mc o Camco C ~ mc o Camco C8 IIiC 0 C a m c o Camco C8 fflc o Camco ~0 C a mc o C m n~ o Camco Camco Cmmco ARCO Alaska, Im Prudhoe Bay Engineering Post Office Box '~00360 Anchorage, A~aska 995"10-0360 Telephone 907 263 4248 Do,~aid F. Scheve Operations Engineering Manager August 18, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-18 Permit No. 77-39 Dear Mr. Chatterton: Attached is the "Intention" Sundry Notice detailing work proposed on the above mentioned well. Very truly yours, D. F. Scheve DFS/CMH/jp Attachment cc: Standard Alaska Production Company Pi(DS 9-18)W1-3 Alaska 0il & 6as C0.s. Commission Ancl~0ra0e WELLS/05 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieidCompany STATE OF ALASKA ALA~,,A OIL AND GAS CONSERVATION CO~,..,,ISSION APPLICATION FO.R SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address Post Office Box 100360~ Anchora§e~ AK 99510 4. Location of well at surface 642' N & 224' E of SW cr, Sec. 1, TiON, R15E, UN At top of productive interval 1256' N & 1116' W of SE cr, Sec. 2, TION, R15E, UN At effective depth At total depth 1353' N & 1194' W of SE cr, Sec. 2~ TION, R15E~ UN 11. Present well condition summary Total depth: measured 9450 feet Plugs (measured) true vertical 9199 feet 5. Datum elevation (DF or KB) 54' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 8. Permit number 77-39 9. APInumber 50-- ~?q-?~?~9 10. Pool Prudhoe 0il Pool Effective depth: measured 9371 feet Junk (measured) true vertical 9122 feet Casing Length Size Cemented Measured depth Structural Conductor 101' 20" 258 sx 101' Surface Intermediate 2713' 13-3/8" 5500 SX 2713' Production 9432' 9-5/8" 1000 SX 9432' Liner Perforation depth: measured 8935' -8950', 8982-9002', 9020' -9038' 9186' -9190', 9209' -9218' ,9228'-9241' true vertical 8699.3' -9045.7' Tubing (size, grade and measured depth) 5½", 17#, L-80 Plastic coated tubing Packers and SSSV (type and measured depth) Otis 12.Attachments 'RQM' SSSV @ 2140'MD; Baker 'SAB' Packer 0 RBg?'MD ~ue Vertical depth 100.99' 2712.98' 9180.90. , 9126'-9142' 9170'-9177' , 9259'-9267' 9276'-9292' Description summary of proposal [] Detailed operations program L~,(~Psketch ~ F[VFF . 13. Estimated date for commencing operation 11/1/87 14. If proposal was verbally approved Name of approver Alaska 0ii & 6as Cons. Commission Date approved 15. I hereby,Aertify that the foregoing is true and correct to the best of my knowledge Signed ~I~_~"~ m,~ ..d~2~¢,~_~- Title Commission Use Otqly Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved by ;:; ' !.',. :~ ~, ::: ;' ,, -,..., Commissioner IApproval No. 7 by order of the commission Datet~::::;>~-/ Form 10-403 Rev 12-1-85 Submit in triplicately,, CTU Cement Squeeze Intended Procedure AFE No. 698202 1. RU WLU and make gauge run to PBTD at 9371'. 2. Rig up coiled tubing unit (CTU) and perform HC]/mud ac~d wash of perfo- rations 8935-9292' BHCS. 3. Squeeze cement perforations with Class "G" cement using CTU Contamlnate cement in wellbore and WOC. ' 4. Jet wellbore clear to 9371 'MD. 5. POH and rig CTU down. 6. Reperforate the following interval (ref. BHCS 11/16/77): 9276-92' 6 SPF Lower Romeo 7. Evaluate injectivity into the Romeo interva]. Perform stimulation ~f necessary (separate AFE). 8. Reperforate the following intervals (ref. BHCS 11/16/77): 8935-8950 Limited Density Zulu 8982-9002 ,, 9020-9038 ,, Upper Victor 9170-9177 ,, Upper Victor 9186-9190 ,, Tango 9209-9218 ,, Tango 9228-9241 ,, Tango 9259-9217 ,, Upper Romeo Romeo 9. Return well to injection. 10. Run post-squeeze injection profile. CMH2/37 Alaska Oi! & Gas Cons, Commission Anchorage 3 i! 2 II iI ! 1. 5000 PSI 7" WELLHEAJ) CONNECTOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) ,3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF I,I I REL I NE BOP EQU I PMENT Il II Il I A!aska OiJ & Gas Cons, i 5 4 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 COILED TUBINO UNIT BOP EQUIPMENT ARCO Alaska, Inc. Post Office B~ $0 Anchorage, Alao,<a 99510 Telephone 907 277 5637 December 13, 1985 Reference: ARCO Pressure Data DS 9-18 ' 9-29-85 DS 9-19 9-29-85 DS 9-25 9-19-85 .~DS 9-2 7 10-3-85 Surface Pressure Fall-off Surface Pressure Fall-off Surface Pressure Fall-off Bottom Hole Pressure Survey ARCO ARCO ARCO DA Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans # 526 DISTRIBUTION Chevron ~ii' Phillips ~'D & M Prudhoe Bay Files Exploration Services R & D Extension Exploration "Sohio ~arathon " ~Texaco mobil ARCO Alaske. inc is a subsidiary of AtlanticRichfietdCompany ARCO Alaska, Inc. ~ Post Office L 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date: November 4, 1985 Reference: ARCO CH Finals ~-29 Spinner 10-13-85 Run 2 5" Camco "-~-,'18 Spinner 10-26-85 1 5" Camco '"~--~1 - 2 Spinner 10-25-85 1 5" Camco --11-4 Spinner 10/17-18/85 1 5" Camco ~~_4'4-23 spinner 10-24-85 1 5" Camco Please sign as receipt of data. Received by Pam Lambert ATO 14 29C Trans 396 Anchorage Chevron £.hi 2 2 i p s D & M ' PB Well Files Exp2. Services R & D Ext. Exploration Sohio Exxon "State of Alaska Sara thon Texa co Mobil ARCO Alaska, Inc. Post Office E 100360 Anchorage, Alaska 99510 " Telephone 907 276 1215 October 2, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-4 DS 9-5 DS 9-6 DS 9-18 Permit No. 76-40 Permit No. 76-47 Permit No. 76-48 Permit No. 77-39 Enclosed are the "SubseqUent'' Sundry Notices detailing work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB/dp Attachments cc: SOHIO Alaska Petroleum Co. File Pi(DS 9-4)W1-3 Pl (DS 9-5)W1-3 PI(DS 9-6)W1-3 PI(DS 9-18)W1-3 Alaska Oil & (~'s C(ms, ~3or:u'nissio,'~ Ar~chora. ge ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL [~X OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well Surface: 642'N & 224'E of SW cr. Sec. 1, T10N, R15E, UM Producing Interval: 1256'N & ll16'W of SE cr. Sec. 2, T10N, R15E, UM Total Depth: 1353'N & 1194'W of SE cr. Sec. 2, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 7. Permit No. 77-39 8. APl Number 50-- 029-20259 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-18 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began reperforating operation on 9-2-85. RU perforating unit and pressure tested equipment. RIH w/gun #1 to shoot select-fire interval 9276-9292' MD (4SPF); pulled up to shoot select-fire interval 9259-9267' MD (4SPF). Shut in well POOH, all shots fired. RIH w/gun #2, to shoot 9228-9241' MD (4SPF). Shut in well, POOH, all shots fired. Secured well, RD. Ref: BHCS 11-16-77 14. I hereb)y~ertify that t/h~j fo/Ee~goi~,g.)is true and correct to the best of my knowledge. L/ Signed. ~~~/~/_ F~_ _~~-' Title Regional Operations Engineer The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10~,03 R~.v_ 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 10,0360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date' September 24, 1985 Reference' ARCO CH Finals ~-"~ 3-26 ~Temp-Log -~ ~J 9-18/Diff. Temp 8-9-85 '--' 9-18 /Spinner 9-1 1-85 9-18~ Temp./Spinner 8-5-85 ~ 11-7 ~'Spinner 8-1-85 -'~ -~ 14-9B ~emp Log 8-8-85 8-18-85 Run 1 5" GO 1 5" GO 1 5" Camco 1 5" GO 1 5" GO 1 5" GO Please sign as receipt of data. Pam L~bert ATO 1429C Trans 325 Chevron · P.%i l tip$ D & M PB Well Files Expl. Servic~_s R & D Ext. Exploration. Sohio' Exxon ' ~: Sfi~'~ t'?'~ f~ A~2 a ska- M~a thom Texa~ - Mobil ARCO Alaska, Inc. ~ Prudhoe Bay [. neering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 22, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil 'and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-6 DS 3-7 DS 3-10 DS 3-18 DS 4-6 DS 4-8 DS 4-11 DS 4-14 DS 4-15 DS 9-8 DS 9-10 DS 9-12 DS 9-14 DS 9-15 DS 9-16 Permit # 76-60 Permit # 76-53 Permit # 79-21 Permit # 79-103 Permit # 76-42 Permit # 76-10 Permit # 78-6 Permit # 78-36 Permit # 78-37 Permit # 76-70 Permit # 76-82 Permit # 77-7 Permit # 77-25 Permit # 77-36 Permit # 77-37 DS 9-18 Permit # 77-39 ~ Permit # 77-38 DS 9-19 Permit # 77-40 DS 9-20 DS 11-2 DS 16-1 DS 16-2 DS 16-3 DS 16-5 Permit # 77-41 Permit # 81-128 Permit # 80-136 Permit # 80-150 Permit # 76-83 Permit # 81-37 DS 16-10 Permit # 80-04 DS 16-11 Permit # 80-118 DS 16-16 Permit # 80-127 DS 17-6 Permit # 80-132 DS 17-8 Permit # 81-74 DS 17-10 Permit # 81-97 Dear Hr. Chatterton: Attached are Subsequent Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB/mjb R ECE i VED At tachment s JAN 2 5 cc: Sohio Alaska ?etroleum Company Alaska Oil & Gas Cons, C0mmissl0ri Anchorage ARCO Alaska, Inc. Is a Subgldlary of AtlanflcRIchfleldCompany STATE OF ALASKA ALASKA C)IL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL~] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-39 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20259 OTHER [] 4. Location of Well 642'N & 224'E of ~ cr Sec. 1, T10N, R15E, UM 1256'N & ll16'W of SE cr Sec. 2, T10N, R15E, UM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-18 1353'N & 1194'W of SE cr Sec. 2, T10N, R15E, ~ 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB I ADL 28327 12. Check Appropriate Box Tolndicate NatureofNotice, Report, orOtherData 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. has converted DS 9-18 to water injection service. The well is part of t_he Flow Station 2 waterfloodproject. The well began receiving water on June 14, 1984. 14. , hereby~..fy th,~t t>~~,t~~t to_t~he best of my knowledge. Signed ~Y~~ / ~ Title R~egional Engineer The space below for Commission use Conditions of Approval, if any: Approved by COMMISSIONER By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicat~ p !-'~ 'c, .... ' ,'-'; ;-'"-";", 6 S ..... w ;..: X '; A 'fl E: ?'{ (:) 'f' .:a ":jj &": A [ .::] ;iF {< -."fi i ,X, "" ...;'. :.;: D., ,!.;'., 'i ;.?!; .... 2 fi!:; .... i (i: ..... 2 7--.. :iii: ,:i. :..,¥" ,..:.'(.' ,. 'i 7 '-" 'i .9. '-i; ..... 2 'i .... ::i!:-q. i"-i,::.', I::, i I. ~.-~i ..... I.- ' t::'hi I. I. ii::' .'ii: I::' 'C L,' (:I I"~ ,:::, (.:.:, }}', .:':'~ ':/ i,,.i ,:.:.:, !. i. i:;.: ,?!.... :S',':.', h i o ,S"ta'te o'f ALaska ARCO Alaska, In Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 12, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 DS 9-16 DS 9-18 Permit No. 77-25 Permit No. 77-37 Permit No. 77-39 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/la Enclosures cc: SOHIO Alaska Petroleum Co. File PI(DS 9-14)W4-3 Pi(DS 9-16)W4-3 PI(DS 9-18)W4-3 RECEIVED OCT 1 5 19B , Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. 18 a Subsidiary of AllanllcRIchfleldCompany - . .......... STATE OF ALASKA ALASK. ;L AND GAS CONSERVATION L '::MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [~i Water Injector ./ 2. Name of OperatOr 7. Permit Number ARCO Alaska, ]:nc. 77-39 / ,, "3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50-029-20259 4. Location of well' at surface 9. Unit or Lease Name 642'N & 224'E of SW cr, Sec. 1, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1256'N & Il16'W of SE cr, Sec. 2, T10N, R15E, UM DS 9-18 At Total Depth 11. Field and Pool 1353'N & 1194'W of SE cr, Sec. 2, TION, R15E, UM Prudhoe Bay Field , 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 54' RKB ADL 28327 , 12. Date Spudded 131 Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 11/3/77 11/17/77 12/1/77 (perfed 2/16/78) feet MSt Single 17. TotalDepth(MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionalSurvey ] 20. Depth where SSSV set I 21. Thickness °f permafrost 9450'MD 9199'TVD 9371' MD 9122'TVD YES]~] NO [] 2140 feet MD 1900' (approx.) 227Ty~e E~ectric or Other Logs Ru. BHC/DIL/GR, FDC/CNL/GR/CAL, CNL/GR/CCL, FDL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SlZE! WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surf. 101' 30" 258 sx Arctic set II cmt 13-3/8" 72~A MN-80 Surf. 2713' 17½" 5500 sx Arctic set cmt ,, 9-5/8" 47# N-80 Surf. 9432' 12~" 1000 sx Class G cmt &S00-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) ....... 9259 - 9267' MD *9020 - 9038' MD 5½ 8,729' 8,589' 9228 - 9241' MD *8982 - 9002' MD 9209 - 9218' MD 26. ACID, FRACTURE, CEMENT sQuEEZE, ETC. 9186 - 9189' MD DEPTH INTERVAL (MDi AMOUNT & KiND OF MATERIAL USED 9170- 9177' MD 8764 9046' TVD ,, 9126 - 9142' MD N/A 8935 - 8950' MD 9276 - 9292' MD *Added 9-10-84 w/4 spf , , 27. PRODUCTION TEST Date First Production I Method of OPeration (Flowing, gas lift, etc.) 3/8/78I Future Injector Date of Test Hours Tested pRoDUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO N/A TEST PERIOD I~ Flow Tubing Casing pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~I ,, 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Anchorage j Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. NAME GEOLOGIC MARKERS MEAS. DEPTH 8934' MI) Top Sad]erochit O/W Contact Base Sadlerochit TRUE VERT. DEPTH 8698' TVD 9075' TVD 31 LIST OF ATTACHMENTS 9322' 9330' MD FORMATION TESTS 9083' TVD Include interval tested, pressure data, all flu~(Js recovered and gravity, GOR, and t,me of each phase. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Reg~'ona 1 Engineer y Signed _ ~'-' ~ ' _/ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and :24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ARCO Alaska, It Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 11, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-14 - Permit No. 77-25 DS 9-16 - Permit No. 77-37 DS 9-18 - Permit No. 77-39 Dear Mr. Chatterton: Enclosed are "Subsequent" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/mjb Attachments cc: SOHIO Alaska Petroleum Co. File Pi(DS 9-14)Wl-3 File Pi(DS 9-16)W1-3 File Pi(DS 9-18)W1-3 ocT1 5 Alaska 0il & Gas Cons. commission Anchorage Inn. I. J'~lihildlarv ~f AtlanllcRIchfleldComoanv ..~_..~ STATE OF ALASKA _ ALASI OIL AND GAS CONSERVATION )MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WEI_~ [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-39 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50-029-20259 OTHER [] 4. LocationofWelt(Surfaoe) 642'N & 224'E of SW cr Sec 1, T10N, R15E,UM (Producing Interval) 1256'N & ll16'W of SE cr Sec 2, T10N, R15E,UM (Total Depth) 1353'N & 1194'W of SE cr Sec 2, T10N, R15E,UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number U.S. 9-18 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations X [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 9/10/84. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 9020-9038' MD (4 .spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #2, shot interval 8982-9002' MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. Ran SSSV, secured well, RD. REF: BHCS 11/16/77 RECEIVED Alaska 0il & Gas Cons. 60mmissi0n Anchorage 14. i hereby,~,ertify that the fo~regoing is true and correct to the best of my knowledge. .fl Regional ~,ng£neer Signed Title The space below for Commission use Conditions of Approval, if any: Approved by. COMMISSIONER By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Prudhoe bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer August 28, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 - Permit No. 77-25 DS 9-16 - Permit No. 77-37 DS 9-18 - Permit No. 77-38 Enclosed are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. S cheve DFS/WT/mjb Attachments cc: SOHIO Alaska Petroleum Co. File PI(DS 9-14)W1-3 File Pi(DS 9-16)W1-3 File PI(DS 9-18)W1-3 ARCO Alaska, Inc. I$ a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASt~ OILAND GAS CONSERVATION )MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) 642'N & 224'E of SW cr Sec 1, T10N, R15E,UM (Producing Interval) 1256'N & ll16'W of SE cr Sec 2, T10N, R15E,UM (Total Depth) 1353'N & 1194'W of SE cr Sec 2, T10N, R15E,UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB I ADL 28327 12. 7. Permit No. 77-39 8. APl Number 50-- 029-20259 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 9-18 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate ,I-~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] C~hange Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations to DS 9-18 at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 8982 - 9002' MD (20') 9020 - 9040' MD (20') REF: BHCS 11/16/77 RECEIVED AUG o 1984 Alaska Oil & Gas Cons. Commlssmn Anchorage 14. I hereby,certify that_the fore_going is true and correct to the best of my knowledge. Signed. Title Regional Engineer The space below for Commission use Date Conditions of Approval, if any: Approved by COMMISSIONER ~ Returtii~d ' By OrOer of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 1, 1984 Reference: ARCO Cased Hole Finals D.S. 3-6 ....... 6-10-84 Diff Temp D.S. 3-19 ~ 5-25/26-84 Spinner Survey D.S. 3-22~ 6-29-84 D.S. 6-10f 7-4-84 D.S. 7-3~- 7-6-84 D.S. 7-18-~ 7-4/5-84 D.S. 7-24~ 4-19-84 D.S. 9-18--- 6-21-84 D.S. 12-15'--- 4-13-84 Spinner' Survey Temp Log Temp Survey Spinner Spinner Diff Temp Spinner D.S. 12-18- 4-14/16-84 Spinner D.S. 13-1/''' 6-17-84 D.S. 13-10''~ 6-22-84 D.S. 13-12-~ 6-18-84 D.S. 13-13j5-31-84 D.S. 13-16J~' 4-12-84 '?"~ '-r-~.'~ ~ S 13-27 >~'' 6-2-84 ................. D.S. 13-28~'~ 6-3-84 D.S. 13-28--'' 6-3-84 D.S. 13-28~'- 7-8-84 D.S. 13-33~ 6-22-84 D.S. 13-33-~' 6-23-84 D.S. 14-3~ 6-30-84 D.S. 14-21- 7-7-84 D.S. 14-24/ 3-25-84 D.S. 14-34~ 5-19-84 Diff Temp Temp Log Diff Temp CFS/Spinner Diff Temp CFS/Spinner CFS/Spinner Temp Survey Temp Log Diff Temp Spinner Log Diff Temp Caliper Log Caliper Log Spinner Log Run 1 5" Otis Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" GO Run 1 5" Camco Run 1 5" GO Run 1 5" Go Run 1 5" Camco Run 1 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 4 5" Camco Run 1 5" Camco D.S. 17-10/ 6-17-84 Diff Temp Run 1 5" Camco ~/~lease sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F · Trans· #301 Chevron D&M DISTRIBUTION Drilling Exp. Services Ext. Exploration Exxon Ge t ty Mara thon Mobil Mobil E & P Phillips Prudhoe Bay Well Files R& D Carolyn Smith Sohio State of Alaska ARCO Alaska, Ir,,~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 1, Reference: 1984 ARCO Pressure Data D.S. 1-4--~ 3-15-84 PBU/CDBR D.S. 1-25J'~ 5-25-84 PBU/CDBR D.S. 1-26 ....... 5-30-84 PBU/CDBR D.S. 3-19 ~---- 5-25-84 PBU/CDBR D.S. 3-22~'' 6-29-84 PBU D.S. 3-23~- 5-24/25-84 CDBR D.S. 6-17~ .... 6-16-84 Static Survey D.S. 7-7A:~-- 6-15-84 Static Survey D.S. 7-13~' 6-14-84 Static Survey D.S. 7-14,~? 6-14-84 Static Survey D.S. 7-16~ 6-30-84 PBU D.S. 7-16~ 7-2-84 PBU/CDBR D.S. 9-8~ 6-20-84 Static Survey D.S. 9-18/~ 6-20-84 Static Survey 2 ~ 6-21-84 Static Survey D.S. 12-16~ 5-19-84 CDBR D.S. 12-17~ 5-20-84 CDBR D.S. 13-33~ 6-22-84 PBU/CDBR D.S. 14-8~-~ 6-28-84 Static Survey D.S. 14-23~--~5-16-84 CDBR D.S. 14-24~ 5-17-84 CDBR D.S. 14-25 5-18-84 CDBR D.S. 14-32~ 5-20-84 CDBR D.S. 14-33~ 4-29/30-84 CDBR D.S. 14-34 ~ 5-19-84 CDBR Otis Camco GO Camco Camco GO GO GO GO GO GO GO Camco Camco Camco Camco Camco /P/lease sign and ~ data. return the attached copy as receipt of Kelly McFarland ATO-1429F Trans. ~290 DISTRIBUTION ~hevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon Mob i M0bil E & P" Phillips Prudhoe Bay Well Files R&D Carolyn Smith Sohio State of Alaska ARCO Alaska, Inc Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 13, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9 Water Injectors Permit Nos: 76-70, 76-82, 77-7, 77-25, 77-36, 77-37, 77-38, 77-39, 77-40, 77-41 Enclosed are the Sundry Notices for Change of Well Status for the proposed Drill Site 9 Water Injectors. Very truly yours, D. F. Scheve DFS:SDC:kg Enclosures cc: SOHIO Alaska Petroleum Co. RECEIVED J u N 1 4 1984 Alaska Oil & Gas Cons. Commissio. Anchorag~ .~-- STATE OF ALASKA ALASKA ( . AND GAS CONSERVATION CO AISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL E3 COMPLETED WELL [] OTHER [] 2. NameofOperatRr 7. PermitNo. ARCO Alaska, Inc. 77-39 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20259 4. Location of Well 642'N & 224'E of SW cr Sec. 1, T10N, R15E, UM 1256'N & ll16'W of SE cr Sec. 2, T10N, R15E, UM 1353'N & 1194'W of SE cr Sec. 2, T10N, R15E, UM 5. Elevationinfeet(indicateKB, DF, etc.)54, RKB I 6. LeaseDesignationandSerialNO.ADL 28327 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-18 12. 11. FieldandPool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casi!ng [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Puli Tubing [] Other I~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or. Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to change Well 9-18 status from oil producer to water injector. It will be operated as part of the Prudhoe Bay Waterflood Project. Work Becorted JUN 1 419 Alaska Oil & Gas Cons. Commissio. An~orage 14'. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~'~. ~.~..'-_~~ Title Regional Engineer The space below for Commission use Date Conditions Of APproval, if any: ORIG'.NAL SIGNED BY LONHI£ C. SMITII Approved Copy By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay k,,gineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer May 10, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 DS 9-17 DS 9-18 DS 9-20 Permit No. 77-25 Permit No. 77-38 Permit No. 77-39 Permit No. 77-41 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/la Enclosures cc: SOHIO Alaska Petroleum Co. File Pi(DS 9-14,17,18,20)W4-3 ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfletdCompany MAY i. 6 i984 Alaska 0il & 6;a3 Cons. Commission ~' ....... STATE OF ALASKA 'VlMISSION~ ~/~/~ ~ ALASK,. ,.,}L AND GAS CONSERVATION ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Welt Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE E~ Water Injector "~ 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 77-39 _ 3. Address 8. APl Number P.O. Box 100360, 'Anchorage, Alaska 99510 50- 029-20259 4. Location of well at surface 9. Unit or Lease Name 642'N & 224'E of SW cr Sec. 1, TION, R15E, UM Prudhoe Bav Unit At Top Producing Interval 10. Well Number 1256'N & ll16'W of SE cr Sec. 2, T10N, R15E, UM D.g 9-18 At Total Depth 11. Field and Pool 1353'N & 1194'W of SE cr Sec, 2, T10, N6,' R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.)~ Lease Designation and Serial No. Prudhoe Bay Oil Pool 54' RKB ADL 28327 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore'116. No. of Completions 11/3/77 11/17/77 12/1/77 (per~'d 2/'6/78)!1 feet MSLI 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 9450'MD_,9199'TVD 9371'MD~9122'TVD YES~ NO [] 21~0' MD feet MD lq~t 22. Type Electric or Other Logs Run B~C/DIL/~R. FDC/CML/~R/CAT. CNT./~R/CCT._ ~)T. 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ...... &SOO- 95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9259-9267' MD 9126-9142' MD ~'" o~, o=o~, 9228-9241' MD w/4 shots per ft. 9209-9218' MD '8935-8950' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9186-9190' MD '9276-9292' MD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9170-9177' MD *added 4/6/84 8699-9046 ' TVD 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 3/8/78 F,~h~re T~_j e~ tot Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO N/A TEST PERIOD I~ ~ ,. Flow~ubing Casing Pressure CALCULATED.& OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CO R E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Alaska Oil & C:.a$ Cons. Commission .... Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Sadlerochit O/W Contact Base Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 8934' MI) 9322' MD TRUE VERT. DEPTH 8698' TVD 9075' TV]) 30. 9083' TVD 9330' MD FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,.',,~/,~ ~~1~ Title Regional Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ARCO Alaska, Inc Prudhoe Bay dngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer May 9, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 DS 9-17 DS 9-18 DS 9-20 Permit No. 77-25 Permit No. 77-38 Permit No. 77-39 Permit No. 77-41 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/la Attachments cc: SOHIO Alaska Petroleum Co. File Pi(DS 9-14,17,18,20)W1-3 ARC(', Alaska, inc. Is a Subsidiary of AtlanticRIchfletdCompany .... STATE OF ALASKA ALASKA AND GAS CONSERVATION CC: MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL[] Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 COMPLETED WEL~ [] 4. Location of Well 642'N & 224'E of SW cr Sec. 1, T10N, R15E, UM 1256'N & ll16'W of SE cr Sec. 2, T10N, R15E, UM 1353'N & 1194'W of SE cr Sec. 2: T1ON: R15V.; UH 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. I ADL 28327 OTHER [] __ 54' RKB 12. 7. Permit No. 7?-39 8. APl Number 50- 029-20259 9. Unit or Lease Name Prudh~ R~y flnit 10. Well Number T")~ Q-q~ 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~X~] Altering Casing [] Stim u late [] Abandon [] Stim u lation [] Aba ndo nment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 4/6/84. RU perf unit, pressure tested equipment. RIH with gun #1, flowed well, shot 9276-9292' MD 4 spf (Ref: BHCS 11/16/77), shut in well, POH, all shots fired. RIH with gun #2, flowed well, shot 8935-8950' MD 4 spf, shut in well, POH, all shots fired. RD. Secured well. MAY 1 6 1984 Alaska 0il & (;,% Cons. Commission 14, hereby_certify that the foregoing is true and correct to the best of my knowledge. Signed .... ~ _ Title Regional Engineer The space below for Commission use Conditions of APproval, if any: Approyed by By Order of COMMISSIONER the Commission Date Form 10~403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate AR~O Alaska, Inc Prudhoe Bay ,:ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 19, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 9-1 Permit No. 75-76 DS 9-12 DS 9-2 Permit No. 76-16 DS 9-13 DS 9-3 Permit No. 76-35 DS 9-14 DS 9-4 Permit No. 76-40 DS 9-15 DS 9-5 Permit No. 76-47 DS 9-16 DS 9-6 Permit No. 76-48 DS 9-17 DS 9-7 Permit No. 76-58 DS 9-18 DS 9-8 Permit No~ 76-70 DS 9-19 DS 9-11 Permit No. 76-84 DS 9-20 Permit No. 77-7 Permit No. 77-8 Permit No. 77-25 Permit No. 77-36 Permit No. 77-37 Permit No. 77-38 Permit No. 77-39 Permit No. 77-40 Permit No. 77-41 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JCD/lmh Attachments cc: Sohio Petroleum File PI(DS as above)W1-3 ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany ......... STATE OF ALASKA ALASK, .)ILAND GAS CONSERVATION (. ,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL[] COMPLETED WELL ~ OTHER 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-39 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20259 4. Location of Well 9. Unit or Lease Name 642'N & 224'E of SW cr Sec. 1, T10N, R15E, UM Prudhoe Bay Unit 1256'N & ll16'W of SE cr Sec. 2, T10N, R15E, UM 1353'N & 1194'W of SE cr Sec. 2, T10N, R15E, UM 5. Elevation in feet {indicate KB, DF, etc.) 6. Lease Designation and Serial No. 54' RKB ADL 28327 12. 10. Well Number DS 9-18 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 9-18 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 8935-8950' MD 9276-9292' MD Ref: BHCS 11/16/77 Subsequent Work Beported ,;~.//~.~. on Form No./~.~~ Dated MAR 2 14. I hereby,~ertify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Conditions of APproval, if any: ~,pproved Copy gRIg'riAL SIGT~ED By Order of Approved by COMMISSIONER the Commission Returned Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office 9r,,, 360 Anchor,qge. ;' ka 99510 Telephone 90, 277 5637 March 31, 1982 Reference: ARCO MAGNETIC TAPES & LISTINGS ,. D.S.6-1 1/14/81 D.S.9-!8¢ 2/24/81 D.S.14-26d2/2~/81 D.S.15-2J 3/12/82 D.S.14-12J 12/5/81 'Tape# ECC 881 Tape# ECC 888 Tape# ECC 1191 Tape# ECC 1248 Tape# ECC 1174 DDNLL DDNLL CN-GR,CDL,DIFL CN CN & GR,BHC,AC,DIFL Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 83 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY STATE OF ALASKA · ~" (_ . ~.-- - A!asl<a 0il A Gas Co.~:s. Co,'~uiliss~on ARCO Alaska, Inc ..... Post OffiCe [ 360 Anchorage, Alaska .99510 Telephone 907 277 5637 May 13, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: DS 5-1 DS 16-13 DS 5-10 B-2 DS 9-18 C-7 DS 1 2-9 C-8 DS 14-18 T-3C CONFIDENTIAL DS 16-5 W. Sak #18 CONFIDENTIAL DS 16-6 Dear Sir' Enclosed please find: 1. The Completion Report for DS 16-5. 2. The Completion Reports and Gyroscopic Surveys for C-7, W. Sak #18& T-3C. (Please note that W. Sak #18 & T-3C are to be considered confidential). e me The Monthly Reports of Drilling & Workover Operations for DS 5-1, DS 14-18, DS 12-9, DS 16-6, DS 16-13, B-2 & C-8. The Subsequent Sundry. Notices for DS 5-10 and DS 9-18. Sincerely, P. A. VanDusen District Drilling Engineer PAV/KJG'sp Enclosures STATE OF ALASKA ALASK, ~iL AND GAS CONSERVATION C,.,MMISSION SUNDRY OTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, :Inc. 77-39 3. Address P.O. Box 360, Anchorage, Alaska 99510 4. Location of Well M, y i 642'N & 224'E of SW cr Sec l, TION, R15E,. U~l. askaOll&~asCons. Corn, Anchorage 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB I ADL 28327 12. 8. APl Number ~o_029-20259 [~. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-18 $.Field and Pool ip~'udhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submii~ i'n Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made ~ Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). DS 9-18: Commenced 3/29/81- Commpleted 4/13/81 (16 days). Commenced operations @ 2200 hrs 3/29/81. NU & tst lub. Pull BPV. Killed well w/safe lock kill pill & 10.6 ppg NaC1. Observe well & alternately bleed off gas & pump in kill fluid. Well @ 0 psi w/slight gas return for 7+ hrs. ND tree. NU & test nOPE. Pull tbg hngr. Cplg below tbg hngr split. Attempt to pull SSSV @ + 28'. Pulled out of rope socket. Fish out SSSV. Run bridge plug. Sto-pped @ 35'. Run 8½" impr blk. Showed + 200© 5½" OD tbg stub. Set bridge plug in tailpipe @ 8725' WLM. PU 1 jt 5-½" tbg & overshot. Catch tbg stub w/overshot. RU WL & perf tbg f/8541 '- 8543' w/4 spf. Circ thru perfs. RD WL. Displ 10.6 ppg CaCI? from tbg & ann w/9.7 ppg NaC1. Sheared tbg out of PBR & POOH. Pick up I~-anchor re- trieving tool & RIH. POOH w/K-anchor. RIH w/5½" completion assy. Attempted to stab into PBR w/o success. Circ HI-VIS pill. Got solid particles in returns. Ran CCL & CAL. POOH w/5½" completion string. Found damaged nose in PBR. Ran impression block & found damaged PBR receptacle. Pulled PBR receptacle. Re-ran 5½" completion assy. Tstd tbg to 2500 psi f/1 hr, ok. Set BPV. ND nOPE. NU tree & tstd to 5000 psi - ok. Displ well to diesel. Shot off tailpipe @ 8719'. Made dummy gun run. Secured well & released rig.@ 1300 hrs 4/13/81. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed, .~~. ~~~~.~ ~.- Title District Drilling Engineer The space'below for Commission use Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, In Post Office ,.,ox 360 Anchorage. Alaska 995'10 Telephot~e 907' 277 5(:;37 April 30, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 PorcuPine Drive Anchorage, Alaska 99501 Subject: DS 4-13 DS 16-4 DS 4-15 DS 16-5 DS 12-6 ,i DS 16-12 DS 9 18 - ~ West Sak 18 Confidential DS 12-9 West Sak 20 Confidential T-3C Confidential Dear Sir: Enclosed please find: 1. The Sundry Notices of intent for DS 4-13 & DS 4-15. 2. The subsequent Sundry Notice for DS 12-6. 3. The monthly reports of Drilling Operations for DS 9-18, DS 12-9, DS 16-4, DS 16-5, DS 16-12, ~lest Sak 18, West Sak 20 and T-3C. Please note that West Sak 18, West Sak 20 and T-3C are considered CONFIDENTIAL. Si ncerely, P. A. VanDusen District Drilling Engineer PAV/KJG:sp Attachments MAY - l 981 Oil & Gas Cons. Commission ,4t~Chorage STATE OF ALASKA ALASKA tL AND GAS CONSERVATION C~..,~IMISSION MONTHLY REPORT OF DRILLi IG AND WORKOVER OPERATIONS · Drilling well [] Workover operation 2. Name of operator 7. Permit No. ARCO Alaska, ]:nc. 77-39 3. Address P.O. Box 360, Anchorage, Alaska 99510 4. Location of Well at surface 642'N & 224'E of SW cr, Sec l, TION, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 54' RKB ADL 28327 8. APl Number 5o-029-20259 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. DS 9-18 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Oil Pool For the Month of. March ,19 81 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 6ommenced 3/29/8]. Disp] 6aC]2 as of 4/3/81. See attached Workover History. 13. Casing or liner run and quantities of cement, results of pressure tests n/a 14. Coring resume and brief description n/a 15. Logs run and depth where run n/a 16. DST data, perforating data, shows of H2S, miscellaneous data n/a 1 7. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED ,'~~, ~~~ TITLE Di_~t.: Drilling Fngine~r DATE_ NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate DS 9-18 WORKOV ER H I STORY Commenced operations @ 2200 hrs 3/29/81. NU & tst l ub. Pull BPV. Kill well w/lO.6 ppg NaC1. Observe well & alternately bleed off gas & pump in kill fluid. Well @ 0 psi w/slight gas return for 7+ hrs. ND tree. NU & test BOPE. Pull tbg hngr. Cplg below tbg hngr split. Attempt to pull SSSV @ + 28'. Pulled out of rope socket. Fish out SSSV. Run bridge p-lug. Stopped @ 35'. Run 8½" impr blk. Showed + 2000 5½" OD tbg.~stub. Set bridge plug in tail- pipe @ 8725' WLM. -PU 1 j.t 5½" tbg ~'& overshot. Catch tbg stub w/overshot. RU WL & perf tbg f/8541'-8543' w/4 spf. Circ thru perfs. RD WL. Displ CaC12 from ann, as of 4/3/81. ARCO Oil and Gas Company North Alas~ istrict Post Office box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer April 24, 1981 Reference: ARCO Cased Hole Finals D.S.9-18 4/15/81 Gamma' Ray Collar Log Run 1 D. S. 16-4 4/10/81 CNL/Gamma Ray Run 1 511 2"/5" sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal f/215 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG ~ MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS :? ,. ,;R ECEI ED MARATHON~' APR2 8 1981 - - CHEVRON Naska Oil & Gas Cons. Commission ARCO Oil and Gas Company is a Division of AtlanticRJchfieldCompany ARCO Oil and Gas Company North Alask-~"'qist rict Post Office x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer April 13, 1981 Reference: ARCO Cased Hole Finals D.S.12-6 3/27/81 Gamma Ray D.S.16-4' 3/24/81 CBL/VDL D.S.16-4 3/28/81 D.S.16-4 4/8/81 Diff Temp Log Diff Temp Log Run 1 5" Run 1 5" Run 1 5" Run 1 2" D.S.9-18 3/31/81 Collar Log Run 1 5" 6~eas e sign and return the attached copy as receipt of data. liary F. Kellis North Engineering Transmittal #177 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHGN CHEVRON ...., RECEIVED Alaska ()il & Gas Cons. Commissio. Anchorage ARCO Oil and Gas Company is a Division of AllanticRichfieldCompany ARCO Oil and Gas Company North. Alas" ~istrict Post Office ,.,ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer March 31,. 1981 Reference: ARCO Magnetic Tapes & Listings D.S.16-1 3/10/81 D.S.13-12 3/9/81 D.S.3-10 3/20/81 D.S.14-7 3/20/81 Tape #DDNLL 8800-9320 Tape #CNL/MS 11800-12990 Dresser Atlas Dresser Tape #CN/MS 9796-10836 Dresser Tape #CN/MS 8950-9650 Dresser Ta~'e #SP 10560-11'~60 Dresser ~~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #153 DI STRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D & M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany ARCO Alaska, Inc ~"" Post Office x St~O Anchorage. Alaska !.)9:~ i~i l elephone 907 277 563F March 3, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 14-9A DS 9-18 Dear Si r' Enclosed please find the Monthly Report of Drilling Operations for DS 14-9A and the Sundry Notice of Intent for DS 9-18. .Sincerely yours, P. A. VanDusen District Drilling Engineer PAV/KJG' sp Enclosures STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CuMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I'~ OTHER [] 2. Name of Operator 7. Permit No. Atlantic Richfield Company 77-39 3. Address 8. APl Number P.O. Box 360, Anchorage, AK 99510 5o-029-20259 4. Location of Well 642'N & 224'E of SW cr Sec l, T1ON, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 12. I 6 . Lease Designation and Serial No. ADL 28327 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-18 (43-2-10-15) 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: ¢ r ' SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment I-~ Repair Welt ~[X Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Atlantic Richfield Company proposes to repair production tubing leak(s) in this well. There is a SSSV stuck at +11' below the tubing hanger at a possible tubing part. The SSSV will be recovered from the well and the 5½" production tubing string will be pulled. The well will be checked for possible 9-5/8" casing leaks and the 9-5/8" casing will be repaired as necessary. The well will be completed with new 5½" plastic coated tubing wi th gas lift mandrels. A 13-5/8" 5000 psi RSRRA BOP stack will be used on well work performed by the workover rig. The BOP equipment will be pressure tested each week and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the Permafrost interval. Necessary provisions for subsurface safety equipment will be run in the completion string. A 5000 psi WP wireline lubricator, tested to working pressure, will be used on all wireline work. The downhole safety valve will be installed and tested upon conclusion of the job. Estimated start- 3/15/81. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Conditions of Approval, if any: Approved by COMMISSIONER ~ur .-~¢~ By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Feb 6, 1981 North Alaska District Post OIlic(-'--"'~x 360 Anchorage ,aska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer Reference: ARCO CASED HOLE FINALS D.S.3-10 D.S.3-10 D.S.3-13 D.S.6-1 D.S.6-9 D.S.6-9 D.S.6-13 D.S.6-14 D.S.6-15 D.S. 14-7 D.S.16-16 D.S.16-16 D.S.16-16 2/10/80 2/lO/8O 1/11/81 1/14/81 1/14/81 1/16/81 1/16/81 1/4/81 1/i0/8i 1/il/8~ 1/19/81 1/15/8t 1/12/81 1/-2/8i 1/21/81 1/13/81 Spectralog CML/Gamma Ray Collar Log DDNLL Spinner Log DDNLL Spinner Log Spinner Log Spinner DDNLL DDNLL DDNLL DDNLL Collar Log/Gyro Corr. CML/Gamma Ray ACB/VDL rleasesign return and the attached copy as receipt of data. DISTRIBUTION Mary Kellis North Engineering NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY Transmittal #53 STATE OF ALASKA Run 2 Run 2 Pass#2 Run 1 Run 1 Run 1 Run. 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON 11 5~ 5~' 5~' 5~' 5~ 5~' 5~' 5~ 5~ 5~ 5" 5" 2" & 5" (on same log) 5" .. 5~' · .;;./,/',~ ,, ' ,"-- ".' ' .... / RECEIVED FEB 1 0 1981 Alaska 0il & Gas Cons. Commission Anchorago ARCO OH and Gas Company is a Diwston of AllanticR~chlieldCompany October 2, 197-9 Reference' Fmclosed are Cased Hole Logs for the fSllowing ARCO we].ls' D S, 4-'~ 5" · ~.~ 5/1/79 Cohtinuous Flow Survey D,S. 4-15 7/31/79 COL/Perf. 5" D.S. 5-10 9/]1/79 ONL 5" ~~ .-~ 9/5/79 Spinner 5" ,* ......... ~.S. 9-18J 7/26/78 Continuous Flow Su~ey 5~' ./~ease sigm and return the attached copy as receipt ~/ of data. K, J. Sahlstrom North Engineering TR/~NsMI~TAL # 583 North Geology I).r J. ] 'L i n Ceo] ogy Sta~:e oF A~nska ~x lob i ] Getty Sob io bhra't't t'h i 1 h :klm Chevron Alaska Re ~ Post O,,!ce. 360 Anchorage, /daska 99510 Tei,.~hone 907 277 5637 ~, .... ~ ~". September 26, 1978 ,~ :';'. i '," .. .,:.,. ~ · , . , , Reference: Enclosed are copies of the following Transient Pressure Surveys: D.S. ~/5-11 D.S. ~/9'18 Dated 8-27-78 Dated 7-24-78 Please sign and return attached copy of transmittal letter as receipt of data. Very truly yours, R.A. Logue North Operations Engineering Transmittal JJ477 AtlanticRicntieidCompany .,~ North American Producing Division North AlaskP~:~.istrict Post Office · .360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-13 Permit No. 77-8 DS 9-14 Permit No. 77-25 DS 9-15 Permit No. 77-36 DS 9-16 Permit No. 77-37 DS 9-17 Permit No. 77-38  Permit No. 77-39 Permit No. 77-40 DS 9-20 Permit. No. 77-41 ] :~':.l_ IL. ....... ~ Dear Sir: Enclosed please find a Completion Report for the above-mentioned wells. .Very truly yours, ~_~.'~-j~. Frank M. Brown District Drilling Engineer FMB:lr Attachments }"orp,: P - 7 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE I IIIIr II I I WELL COMPLETION OR REcoMPLETION REPORT AND LOG* III II L I W ELI. W ELL DR Y Other b. TYPE OF COMPLETION: wm.L L-~ ovum r.x n.~CK nESVR. Other Perforated 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 4. LO¢,~T~O,~ OF WELL (Report location clearly and in accordance with any State requirements)* ~t~u~c~ 642'N & 224'E of SW cr Sec.1, T10N, R15E, UM At top prod. interval reported below 1256'N & ll16'W of SE cr Sec, 2, T10N, R15E, UM At total depth 1353'N & 1194'W of SE ce Sec 2, T10N, Ri5E, UM 5. AP1 NU1ViJ~tICAL CODE 50-029-20259 6. LF. ASE DESiGNATiON A_ND SERIAL NO. APL 28327 7.IF INDiA_N, A-LLOTTEE OR TRIBE NA2VLE 8. UNIT,FA2/2V[ OR LEASE NAME . Prudhoe Bay Unit 9. WE~L NO. DS 9-18 (43-2-10-15) 10. ~.~ ~.~ voo,., o~ w~DPhdhoe Prud~ho_e Ba.y Fi el d-Oil Pool OE~J ECTIVE) Sec. 2, T10N, R15E, UM 12. PL"flJVIIT NO. 13. DATE SPUDDED 11-3-77 / I I-IOW ~qY* ROTARY TOOLS 945_02JgD_, 9199'TVD |9371'HD, 9122'TVD ,I... Single =. VROr~Ucn,~ mV~RVALtS), OF ax-ns CO~P~TrO~--TOV, serrate, NAUE (~r, ANt> Top Sadlerochit 8934'MD, 8698' TVD Base Sadlerochi~ 9330'MD, 9083..' TVD . 24. TYPE ELECTEIC AND OTHEi% LOGS RUN BHC/DIL/GR, FDC/C~L/GR/CAL. , CNL/GR/CCL, .FDL _ 25. CASING RlgC:OR]~ (Report all strings set in well) 77~39 11-17-77 12-1-77 2-16-78) 54' RKB .~ INTERVALS I)R[LI,ED BY [ CABI,E TO() I.,q Ail !23. WAS DIRECTIONAL t SU£,>VEY MADE Yes t GRADS - i ' CEMLNTING 20" 94#welded H-40 [ 101'' 30" , 258_sx__Ar_c_tJc~et Ikcm 13-3/8" 72# Butt [.MN-80 {2713' 17-i/2.[' 5500 sx ArCtic set cmt 9-5/8" 47# Butt ~ N-80 [9432' 12.-i/4[' 1000 sx Class G Cmt ........ &/s~°-951 ,l , ,, LINER I~]EC OILD 20. 28. pERFoRATiONS OPF~N TO PRODUCTION ' (interval size and nurnber) 9259'-9267" ~ 9126'-9142' 9228'-9241' w/4 shots per ft. ~?,~©UNT PULLED 9209'-9218' 9186'-9190.' '~ ! 1 ' (' ~_9170 =9 77 ,, 30. t 27. i'U BING RE'CO[hi) [ (R~D) SIZE DEPTH SE/' ~XiD) PACKER SET (MD) t0729',, , , 85~9' S-:O , Fii~C'IGRE, C~,iENT SQUEeZe, E'i'C ACID, ~ DEPI%i 1NTF-~V.~L (MD) II II I II I Ir I I I I i PRODUCTION DATE FIRST PI%eDUCTION [ I:rp~ODUCT1ON MEII{O'D (Flowit*g, [fas lift, parnping--size and type of pump) __- 3-8-78[ Flowing .... GAS--~'ICF. DAT~ OF T,ST, {~OURS TEST~ '[CItOXE SiZE PP, OD'N FOR OI~BBL. ___ 3T~22.78~ ,, 6.1 1,53/64 . - "I 1315.8 l FLO~V, ~J RING' ]CASI~'G PRESSURE 1CXLC~TD OI~EBL. GAS--~vICF, o58 I - I ~ 5177 I 3280 ~,1. DISPOSITION OF GXS (Sold, u~ed yep yue[, vented, etc.) __~Re_in iec t ed 32. LIST OF ~TTACHMENTS IAM,DUNF AND, I-~!ND OF MA'IEiilZLL USF~D - . . I\5 ~:L:'I'.~ :'FATU~ ~ Producing or ::,mt-in) Producing ~V/~'IER~BBL. [ GAS-OIL II,~TIO 833.1 I 0 I .,,634 WA~BBL. [ OIL Gt~AVITY-~I (CORR.) I 0 I 27.0 [TEST WITNESSED BY Production 0perarions 'all-available records . --~.~,~-. I hereby certify that the zf~regolng and attacb~ed information is complete and correct as determi'ned from *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as referer~ce (where not o~herw, ise sho-,,vn) for deplh measure- ments given in ether spaces on this form and in any attac~'~ments Items 20, and 22:: If this well is completed for separ~]tc production from more than one interval zone (multiple completion), so state in item 20, and in item ?? show the p~cJucir~.g interval, or intervals, top(c;), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be seperately produceJ, show- ing the ackJitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoul:J show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMM'AItY ()1.' F()I~MA'I'I()N 'l'P.k%'l'.'~ IN('I,UI)IN(; IN'I'I%~t(VAL TF~N'FED. I)})~SIJI]E I)A'I'A ~ R~COVERIF~N OF OIL GAS. 35 G~GIC MARK~ WAT~ AND MUD NAME MEAS. D~{ ~U~ V~T~ D~{ ~6. CO~E DATA. A~'I'ACI~ BHIE~ AND I)ETECYI'EI) SIIOWS 'OF Olb, GAS Oft XVAq~I. ............... };~'0)I! ' J. A. J'~oc]lcm/t(. A:._j_,(_)guo ..- ~,el]. N~me · · are the follo:,,.'it~.g for t]~e subject we]._l' Acid or Fracture Treatment Log - tL~IP })uildup & Flow Profile Sul~roy }~oreho].e Geometry I,og Carbon ~ygen Log (.a~.no Collar Log Cc~aent B~nd Log Co:~l)ensated. Neutron Log - Cased Core Analysis'- Interval .Core NO. Core Description (~$IC)-- Interval COre ,~- .- . ........... L~>c~ ~pt~on (Cony.) - cpre No. Directional SurvFy- Gyro - Single ShoL - }jultishot · Engineering Production' Log Fluid Analysis ' . Fluid . .flamma t~ay Location Piat Monthly l~'ell Test ])ata Mud Log Perforat~g Record State Reservoi~ Pressure Report Surveillance Reports Temperature Log ~-~-Transient Pressure Surveys ~ TVD Logs - ~uel Induction Laterolog - Compensated Formatic)n ~ensity Log ~ Compensated Neu'Lron-I::o~u,ation Density Log - Borehole Compensated Sonic Log - Porosity Log P. O. ~o~ ~0 Anchorage, Alaska 99510 Scale 'Xerox Sel~.ia 'BI. Line / ' .%.: L.,~kb FrOlll ' J. A. Rochon/R. A. Lo_gue__ Well Name' ..... ~!:t-ecl herewith are the following for the "~:~' ' No. Scal~ Xerox Sepia BL Line Acid or Fracture Treatment Log - B[-IP Buildup & Flow Profile Survey Borehole Geometry Log Carbon Oxygen Log con = Cement Bond Log ....... Compensated Neutron Log - Cased Hole Core Analysis - Interval Core No. Core Description (~IC) - Intez~al Core Description (Cony.) - Core No. Directional Survey- Gyro - Single ~h0t - Multishot --.Engineering Production: Log '-~- Fluid Analysis _~' .Fluid. Density Gan~ma Ray · Location Plat ?.lonthly Well Test Data Mud Log 'Perforating Record State Reservoir Pressure Report Surveillance Reports Temperature Log -- :Transient Pressure Surveys A;iCho?,:'; TVD Logs - IX~el Induction Laterolog - Compensated Formation Density Log - Compensated Neutron-Formation Density Log - Borehole Compensated Sonic Log - Porosity Log )]:case }~etttrn Receipt To: Ms. R. A. Logue Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska 99510 o o North Alaska District Engineering T RAN S bi I T TA L 'Fo' From' ])ate' ___March~13~ ]97B . Well Name: Transmitted herewith are the following for the subject well' Run No. Scale -- ! BHC Sonic/Caliper Log 2 '-BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Ga~.a }L~y Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description '(SWC) - Interval Core Description (CQnv~.) - Core No. I).i. rec'tional Survey -' Gyro Single Shot ' ~ltishot Drill Stem Test - Test No. Ikml Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gmnma Ray/eCL Laterolog Location Plat Microlaterolog Microlog .. ~adlog -~ Interval Sample Log (A.R. Co-.~'- %nterval' S)mergetic L'og TVD- DI L TVD-Porosity Log Receipt Acknowledged For' Date' Please retrain receipt to' Attn' }&. Donovan Jac]:son Atlantic Richfield Co. any North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 J. A. Roch°n/D. R. Jackson D.S. 9-18 Xerox Sepia BL Line Iea ea. By' ,,Atlantic~ichfieldCompany North American Producing Division NOrth Alas~,~ .District Post Offic. ~x 360 · Anchorage, Alaska 99510 Telephone 907 277 5637 February 28, 1978 Mr. Hoyle H. Hamilton State of ·Alaska Department of Natural ·Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' D.S. 1-5 (23-9-10-15) Permit No. 70-40 D.S. 2-2 (23-30-11-15) Permit No. 70-35 D.S. 9-17 (43-1-10-15) Permit No. 77-38 ~. 9-~43-2-10-15) Permit No. 77-39 D.S. 9-19 (34-t2-10-15) Permit No. 77-40 D.S. 9-20 (21-12-10-15) Permit No. 77-41 Dear Sir' Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above-mentioned wells. Very truly yours, ' ?' ,I ' ;:'%:?,: .... .(. ,,~ ~ ...... i,~_.. ':~ ~_~. Frank M. Brown D~str~ct Drilling Engineer /am Enclosure i:i E( E IV E D MAR - 2 i978 Divi;~lon oi (ill and Gas Our~sarv~tioa Form 10-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. V~/IELLLF'~ GAS r-'] OTHERWELL 5. APl NUMERICAL CODE 50-029-20259 6. LEASE DESIGNATION ANO SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 2. NANtEOF OPERATOR 8. UNIT, FARM OR LEASE NAME Atlantic Richfield Company Prudhoe Bay Unit 3. ADDRESS OF OPERATOR P.O. Box 360; Anchorage, AK 99510 1, TION, R15E, UM 4. LOCATION OF WELL At surface 642'N & 224'E of SW cr Sec. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 9. WELL NO. DS 9-18 (43-2-10-15) 10. FIELD AND POOL, OR WILDCAT Prudh0e Bay Field-Prudhoe 0i-1 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 2, TION, R15E, UM 12. PERMIT NO. 77-39 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) Perforate (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form,) P001 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. Began perf operations @ 2130 hrs 2/14/78. Tstd tree, csg & wireline BOP's. Pulled dummy valve Perf'd intervals 9259'-9267' 9228'-9241' 9209'-9218' 9186'-9190' 9170'-9177', 9126'-9142' w/4 shots' per ft. All perf's referenced to open hole BH~S log of 11/16/77. Ran Amerada press bombs & FDL. Flowed well. Ran & set ball valve. Tstd balance & control lines to 5000 psi OK. Bled press above ball valve to 0 psi, held OK. Installed & tstd tree cap to 5000 psi OK. Released well to Production Dept @ 1500 hrs 2/16/7~8. 16. I hereby certify that the foregoing is true and correct SIGNED. ~: ~})?t >~'- TITLE District Drilling Engineer DATE 2/28/78 (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side North Alaska District Engineering T R AN S bi I T TA L From: J.A. 'Rochon/D. R. Jackson ._ Date' JanuarY, .31, -1978 Well Name: _ .D.S. 0-71 8 Transmitted herewith are the following for the subject well' Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Garmna Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.)-- Core No. Directional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog 5" Formation Density Log Formation Density Log/Gamma Ray Ganma Ray/CCL Laterolog Location Plat b~crolaterolog Microlog b~dlog - Interval Sample Log (A.R. Co.) - Interval Synergetic Log r~rD-DIL Rg/D-Porosity Log 5I! 5I! ~ ea, ~ ea. · i· e~. . / ea. ., ,l ea. I ea. Receipt Ackmowledged For' Attn' ~,~. Donovan Jackson Please retmm receipt to' Atlantic Richfield Co. any North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 #771 ' Date- North Alaska District_ Engineerj_.n_%g T RA N S M I T T A L ' .. · . Transmitted herewith are th® f611owing for' 'the subject'we!l".~/ ".' " Scale' Xerox . Run No.. :. - - BHC Sonic/Caliper Log · . ' BHC Sonic/Calipe9 - Gam~ma'Ray Log ' BHC Sonic/Gamma P~y Log Caliper/eCL -..' .-. Cement Bo. nd L0g/VDL "'"' .-. "" Co~ensated Formation iFansity L~g' " Compensated Neutron-Formation Dens-Sty: Compensated Neutron Log .- Core Analysis - Interval · . · - Core' No. -' - .. Core Description (SWC) - Interval --. Core Description (Cony.) - Core No. Directional Survey...- ~yro .., Single Shot ~ltishot '. Dril~ Stem Test - Test No. 'Paal Induction' Laterolog. . Fm~nation D~nsity Log ' Formation Density I?g/Ga~.ma Ray. Ga~ma P~M/cCL Laterolog Location Plat ' ' ~Hcrolaterolog F~icrotog ~4udlog- tnte~al Sample Log (A.R.c6.) -. Interval% . S~a~-~';,-- Log .. TVD-DIL -'-;' . · · 'iYO-Porosity Log-'-'' Rcc:cipt Ackno~./ledged For: . Date: Please return receipt to: At.~fl: _Mr. Dono~an Jackson 6Vlantic Richfield Company ~o~tt~ Alaska Engineering P. O. Box 360- .o . Sepia 'BL Line ..- · . '... . . · . .. ." . : (':"- · . . .. · · .. ,~,[lan~l¢l-Ilcnt'lelQ t.,ompany r~orm/~mencan ~roaucm9 North Alask~...District Post Office c 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 25, 1978 Mr. Hoyle Hamilton State of A1 aska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, A1 aska 99501 Subject' D.S. 9-17 (43-1-10-15) Permit No. 77-38 / .... D.S. 9-181243-2-1u-15) D.S. 9-19 (34-12-10-15') Permit No. 77-40 D.S. 9-20 (xx-12-10-15) Permit No. 77-41 Dear Sir' Enclosed please find our.Sundry Notice outlining our plans on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /am Enclosures Form 10-403 ~'-- Submit °'intentions" in Triplicate REV. 1-10-73 & *'Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) OIL [~ GAS g WELL ~LLI_J WELL OTHER 2, NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360; Anchorage, Alaska 99510 LOCATION OF WELL At' su trace 642'N & 224'E of SW cr Sec. 1, TION, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB Check Appropriate Box To I~dicate Nature· of Notice, Re .5. APl NUMERICAL CODE 50-029-20259 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. If INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. Drill Site 9-18 (43-2-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 2, TION, R15E, UM '~ 12. PERMIT NO. 77-39 sort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDtZE REPAIR WELL (Other)  PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS Perforate SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOO'TING OR ACIDIZING ABANDONMENT* (Other) _ _ (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PRoPOsED OR COMPLETED OPERATIONS (Clearly state all pertlnertt details, and give pertinent dates, including estimated date of. starting any proposed work. Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval. All perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The downhole safety valve will be installed and tested upon conclusion of job. Estimated Start Date: 2-9-78 ]6. I hereby cer_[tlfy that the foregoing is true and correct s,~NE i TITLE Di stnict Drl q. Enqineer DATE 1-25-78 (This space for State office Use) CONDITIONS OF APPROVAL, IF AN~: TITLE Petroleum Engineer DATE See Instructions On Reverse Side January 31, 1978 A p p rove d ':,~;,~ ~'~ 'v R eturm~d Ol-30-7f To' North Alaska District ,~2gineering TRANSMITTAL .. From' J. A. Rochon/ R. A. 17 II- 7/" t;rell Name: Date: - Transmitted here~it~ are ~he fOllowing for' the subject well' ~/Z)~f-~.' ,: . Run No. . '- Scale Xerox -. Sepia · . LO .U .............. .. BHC Sonic/Caliper Log BHC Sonic/Caliper - Garmma'Ray Log BHC Sonic/Gamma Ray Log. Caliper/CCL . Cement Bond Log/VDL Compensated Formation Density' Log Compensated Neutron~Formation. Density Compensated Neutron Log Core Analysis - Interval · Core' No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Sho~' . ~Mltishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log . Formation Density Log/Gamma Ray- Gamma Ray/CCL Laterotog Location Plat Microlaterolog Microlog Mudlog- Interval Sample Log (A.R. C6.) Interval Synergetic Log TVD-DIL TVD-Porosity Log ...' BL Line Receipt AclmoFledged For: Date' Please retun~ receJ.pt to: Attn' ' Mr[ Donovan Jackson Atlantic Richfield Company North Alaska Engineering North Alaska District Engineerin~ T RAN S bl I T T A I, To' From: J. A. Rochon/D. R. Jackson Date' .January.. 9,19_~8 Well Name' Transmitted herewith are the following for the subject well' Run No. Scale .. BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond L~g/VDL Compensated Formation Density Log Compensated Neutron-Formation. Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (~VC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Ganmm Ray Gamma Ray/CCL Laterolog Location Plat ~ficrolaterolog Microlog Mudlog - Interval Sample Log (A.R. C6.) - Interval Synergetic Leg T~q)-DIL TVD-Porosity Log Collar Log 5!! . D.S. 9-18 Xerox Sepia BL Line ea. ~ t .ea~ Receipt Ackno~¢ledged For: AC/tnj. b'~. D6n~van Jackson Please return re.ceipt to' ~tJ~intic Richfield Company ~Fdrth Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 #732 At~:antic, Richfie~dCor~pan~ North Arneri--~'~ Produci~9 Divisio~ North A~ask~. ,strict Post Office Bo× 360 A~chor~ge, A]~k~ 9~510 Te~epho~ 907 277 56;~'~ December 14, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-18 (43-2-10-15) Permit No. 77-39 Enclosed please find a Completion Report along with the Drilling History and Multi-shot Directional Survey for the above-mentioned well. - .......... Very truly yours, District Drilling Engineer /am Enclosure ~ SUBMIT IN '.lug.if .'E * STATE OF ALASKA ..,therm- sl rl~ctions OB reverse sMe: OIL AND GAS CONSERVATION CO/~MITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. T~PE 0F WELL: Oil. [.___Z]~ 0^S ~ ~ WEI, I, WELL ~ DRY~ Other b. TYPE OF COMPLE~ON: x~ EI.I. ~VER Ex ~ B.~CK ~ESVR. Other 2. NAM E OF OPERATOR Atlantic Richfield Company 3. ^DI}RESS OF OPERATOR P.O. Box 360; Anchorage, Alaska 99510 4. Lo('.,'rmx o~- W}:LL (Report location clearly and in accordance with any State requirements)* At .su. rfa ce 642'N & 224'E of SW cr Sec 1, T10N, R15E,UM At top prod. interval reported below 1256'N & ll16"W of SE cr Sec 2, T10N, R15E, UM At total depth 1353'N & 1194'W of SE cr Sec 2, T10N, R15E, UN 'OIIIGINA[ 5. API NLqViEt~CAL CODE 50-029-20259 §. LF-.ASE DF-iSIGN.ATION A2WD SERIAL I'IO. ADL 28327 7. IF INDIA_N, AJ-,LOTTEE OR TRIBE NA2~iE '8. UNIT,FAILS OR LF~kSE NA]~rIE Prudhoe Bay Unit 9. }VE2~L NO. ('Ds 9-la .(43-2-10-15) ~0. #mLD--~N'D POOL. OR wILDcaT Prudhoe 0il Pool - Prudhoe Bay Field- 11. Sl~.C., T., R., M., (BOTTOM I-IOI_~ OBJECTIVE) Sec 2, T10N, R15E,UM 12. PER~IIT NO. 77-39 · I-IO~V 5~Y* TOOLS -- CABLE TOOI. S 9450'~,m 9199'T~ I9371'.~ 9122'T~ [ Single ~. PRODUCING ~NT~RVAL(S), OF THIS COMP~TIO~--TOP, BOSOM, NAME (MD AND ~)* ,23. WAS DIRECTIONAL t SURVEY MADE Top Sadlerochit 8934'~ 8698'T~ ~ yes Base Sadlerochit 9330'~ 9083' TVD 24. 'V~/PI'; EL,F('T[II¢' AND (.)TtlEi% LOGS RUN BHC/D1L/GR, FDC/CNL/GR/CAL, CNL/GR/CCL CASING RECORD (Report all strings set iii wi'{'l) C/kSIC4C; SIZE 'WEIGHT, DEPTH SET (MD) HOLE SIZE CEi\ILNTING t~ECO}LD 20" 94~/ Welded 30" Circ to ~urf 500 sx 13-3/8" 72~ Butt 2713' 17-I/2'* 5500 sx Arctic set cmt 9,5/8" 47~J Butt 9432' sx Class G i A2, 'IOUNT PULLED rox 26 L[N',-';;{ H.ECOI{Z} 27. TUBI1NG RECOI~LD 5IZ~I TOP (?,ID~ F:OTTONi (MD) ACKS CE),iE~N~T* SCilEEN (R~D) SIZE DEPTH SET (P&D) ~ PACKER SET (NID) 8857' , i 8728' 28 PEi(F(H~A'IiONS OPEN TO PROI N/A (hltcrval, size and number) 29. ACID, SC'CT, IY;~AC~.URE, C~',iENT SQUE?ZE, ETC. D~PI'~i 1NTE~V.~ (MD) A~GOUNf 2~ND I-2!ND OF AfAq_E?J. AL USED N/A 30. PIIODUCTION DA'fl:; F'II::-;F ['I:.©I~UCTION [ PIIODUCT1ON SEll{OD (Flowilng, ?las lif~, pumping~size and type of pump} N/A DATE OF TZST, ~}i I ]PROD'N FOg OI~BBL. GA~CF. L ~5~V[ '~'U~i~G IcArsI. NC;~RESSURE ICALCD~T~ OI~BBL. GAS--LICF. [ }}1J~;1SPOSlTi0N OF GAS (Sold, u~ed /or /eel, vented, etc.) I \~:ELL STATUS (Producing or j Vv'ATER--13BL. [ G~S-OIL IL%TIO iWATEt~--BBL. I OIL GRAVITY-~I (CO~R.)  TEST WITNESSED BY' --' -- 32. /.Isa' oF ATTACHMENTS Drilling History, Multishot Directional Survey :;2. I hereby certify that the for.~gotng and attached information is complete and c~rect as determined from alt-available records ii i i I *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for subn~i*t~ng a complete a~cJ correc~ all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where no* otherwise shown/ fo~ depth me,~sure- merits g~ven ~n c~her spaces an ~his form and ,n any Items 20, and 22:: tf tJ~s well is completed for separ,~tc :)r,-c]:;ctr~n frc~'-, ,"o't' th3n one ,,~terval zone (multiple completior~), so state ~n ~ten~ 20. and in ,te',~ 22 sh(~vv top(s), bottom(s) and name (s) (if any) for only the inter'v.,! rat,orted ~r~ ~ten~ 30 Subm,t a separate report (page) on this form, adequately identified, for each add~t~or~l ~r~tu~ w~l to be seperately prodc~ce:t, show- ing the a~itional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion re~rt on this form for each interval to be separately produc~. (~e instruction for items 20 and 22 above). 34. SUMMAI{Y OF' ?OI{M^TI()N TE2S'I'.% IN('LLII)IN(; INTF. ItVAL TE,qTED. I,ItE.~StJF{E DATA A_ND p,~COVEI/IF~% (>F ()IL GAS 35 G I~OLOG IC WATIgl{ AND MUD NAME M~AS afl. ~COIIE DATA. Afl'ACH AND :I)ET~C~ED SHCgWS OF OIL. G AS ,O'll XVAT~I. ... ., DS 9-18 (43-2-10-15) API 50-029-20259, ADL 28327, Permit No. 77-39 Spudded well @ 1830 hrs 11/3/77. Drld 17-1/2" hole to 2750'. RU & ran 13-3/8" csg w/shoe @ 2713', FC @ 2631'. Cmtd w/5500 sx Arcticset cmt. Drld cmt & 10' new hole. Tstd form. Drld & surveyed 12-1/4" hole to 9450'. RU & ran BHC/DIL/GR, FDC/CNL/GR /CAL. Dropped multishot. RU & ran 9-5/8" csg w/shoe @ 9432', FC @ 9391'. Cmtd w/1000 sx Class G cmt w/0.3% D13R & 0.75% D65, 15.8 ppg slurry. Opened upper FO @ 2402'. Circ annul. Closed upper FO. Opened lower FO @ 2526'. Cmtd 2nd stage thru lower FO w/300 sx Arcticset. Rev out excess. Closed lower FO. Did Arctic Pack job. Circ & clean up mud. Displ mud w/fresh wtr Rev out wtr w/CaC1o. Tstd csg. Ran CNL/GR/CCL. Ran gauge ring & junk bskt. R~ & ran 5-1/2" tbg w/~hear sub @ 8857', Baker pkr @ 8728', sliding sleeve @ 8607', RQY nipple @ 2065'. Tstd control lines & tbg hgr to 5000 psi OK. Displ tbg w/diesel. Set pkr. NU & tstd xmas tree. Pulled dummy valve. Ran dummy gun & CCL. Reran dummy valve. Tstd control lines. RU for long term tbg tst. Released Rig. @ 2100 hrs 12/1/77. Eastman / ~ Whipstock l A PETROLANE COM~ REPORT of SUB-SURFACE DIRECTIONAL SURVEY ATLANTIC RICHFIELD COMPANY COMPANY #9-18 WELL NAME PRUDHOE BAY ' LOCATI ON JOB NUMBER Al177 SO160 TYPE OF SURVEY MULTI-SHOT DATE 11-28-77 SURVEY BY JEREMY BEATTIE OFFICE ALASKA --cOMPLET ION REPORT .... ATLANTIC RICHFIELD CO. --HAGNETIC MUL'TISHOT"'SURVEY NOV, 2.~., 1977 DRILL SITE 9'18 DECLINATION 3i DEGREES EAST .... RADXU5 OF CURVATURE METHOD OF COMPUTATION K D ELEV, 54 FT. ].C_~.~!TED.._FOR.._.EASTMAN__B.Y_ F.M. LiNDSEY AND ASSOCIAT~-S ................................................. RECORD OF SURVEY ................... AI~L'-'-C-Ai~-cuL~T-ION$ PERFORMED BY I 0 M ELECTRONIC"'COMPUTER ..... __DEP._T_ H .ANGLE .......... DER_TH ........... SEA DIREC D M .......................... DEG, __ 620 ...... 0_.15 619,99 ......... 565,99 ....... S15,00E _ _.1150 ...... 0...15 ........... 1149,99 ...... 1095,99 ...... $44,00E ...... 1815 0_15 ...... 181~,_98 .... 1760,98 _ $ B,OOW .___2693 ...... O_SO .... 2692,96 ...2638,96 N61,00E '. 2881 ...... 0 15 ........... 28e0,96 ...... 2826,96 N87,OOE __2.9.7.5 .....0.1~ ...... 2.9..?4,96 ..... 2920,96 S85,00E 3D.6.90_~0 ..... ~.068,9~ .... 301~,95. ST?,OOE 3253___0_.30 .......... 3252,95 31.9.8,95 S71,OOE ~.3.46 0 45 .... 3~45,94 .... 3291,94 3440 0 45 34~9,93 3385,'93 S39,00E 3533 0 45 ...... 3532,92 "3A78,92 $ 6,005 .......... 3627 0 45 .... 3626,92 3572,92 S 7,00E .37'21 .... 0..30 ..... 3720.,91 ...3666,91 .. NTI,OOW 3814...3_30._3813,8A ..... 3759,84 NTO,OOW 3908 ~ 0 3907,51 3853,51 N77,00W ~001--'B--~'5 ......3'999.~9 .... 39&5.79 N84.0UW ...... 409~ [1'-~-"-4091~47 ........ a037'47" 587,00W ~187--13-15--4182,39 4128,39 S86,0~W &279 .... 15 30 427~,50 ....... ~217,50 N84,00W TOTAL COORDINATES 0.00 $ 0,00. W . . 1,30 $ 0,35 E 3.29 S 1.47 5,96 $ 2,3~ 8,59 $ 6,16 8,30 S 6.9~ 8.22 $ 7,54 . 8.23 S 7.95 8,32 S 8,55 E 8,51S 9.33 E 8.7~ S '-' IO,IO'-E'' .... 9.13-'S 11"'.0~ E 9.89 5 ........ 1'2.00 E 11,00 S 12,46 E 12.:22 $ -12.59 E 12.76 $ 11,93 E .. 11.68 $ 8.87 E 9.47 S 1,~1E 7.56 S 9,95 W 7,16 $ ....... 25'.48 W 8,35 S "44,97 W 7,95 S "' 67,78 W 437'2' 'i6--15- -4360.96 4306.96 --NSI.OOW 4.63 S 93.00 W 44'6'5 16--'-30 ...... 4450,18 ...... 4~96,18 N79,00W ........... 0,08 5 '- 118,82'W ._ 4 ..... 5_. 30 N ? 9 · o o w .......... 9 N ...... 14 4.94 w CLOSURES DISTANCE ANGLE D M S 0,00 S 0 0 0 W 1,35 S 14 59 59 E 3,61 $ 24 7 17 E 6,40 $ 21 26 51 E 10,57 S 35 40 8 E 10,81 S 39 51 0 E 11,15 S 42 31 0 11.44 S 44 0 16 E 11,94 S 45 46 46 E 12,63 S 47 37 11 E 13.36 S 49 8 16 E 14.33 S 50 24 53 E 15,55 5'50 30 0 E 16,62 S 48 33 24 E 17.55 S 45 51 57 E 17,47 S'43 4 5 E 14,66 S 37 13 7 E 9,57 S 8 29 ~9 E 12,50 $ 52 44 55 W 26.46 S 74 17 53 45,7/, S 79 28 32 W 68.24 S 83 18 15 W 93,11 5 87 8 43 W 118,82 S 89 57 32 W 145.02 N 88 1 38 W' DOG LEG SEVERITY DEG/IOOFT 0.000 0,040 0.024 0.033 0,028 0.157 0.266 0,037 0,266 0,010 0,047 0.269 0,345 ' 0.458 0.014 0.266 3,226 2,661 2,424 2.978 2.420 2,565 0,845 0.320 0.269 SECT.ION DX. 0,00 -0,89 -2.79 -a,76 -9,36 -9,91 -10,42' -10,79 -11,38 -12,15 -12,95 -13,96 -15,16 -Ao 73 -13.16 -5,5C 5.51 19.5] 36,4] 57 "OZ 81,0~ 131 · 8'] MAGNETIC t,~ULTISHOT SURVEY RECORD OF SURVEY ......................... ALL CALCULATIONS PERFORHED BY I B M ELECTRONIC COMPUTER ~OV. 21, 1977 ........................................ TRUE --~H E-~'S"-6 R X 'F'T-'-V-E R T I C A i~ ................. sUB .......... DRZFT ..... TOTAL COORDINATES DEPTH ANGLE DEPTH SEA DIREC D M DEG, DOG LEG .. C L O S U R E S SEVERITY OI STANCE ANGLE DEG/iOOFT SEC T I ON DISTANCE _47.~*_.17_!5 ..... 4717.29 .......... ~.663.29 .... N?5.00W ........ 17.14 N 197.53 W . . 4838 17 0 4807,12 4753,12 N76,0OW 24.07 N 224.33 W _~93!__17 0._ 4896,06 4842,06 N75,00W. 30.87 N. 250.65 W - . 5023 17 0 498~.04 4930.04 N73,00W 38,29 N 5'Y1"6-~?- 0 5072.97 50z8'.97 ....N72.00w ........ 4'6.~? N ........... 5209 I7 15 5161.85 5107.85 N71.00W 55,15 N ................... 5303 ~7 ~5 5251.62 5197,62 N69.00W 64,69 N · --~9~ 17_15 ....... 5340,~4 _..5286,~4 N67,00W.. . 75.02 N 5487 17 15 5~27.34 5373.34 N66,00W 85.78 N ........ 5581 1~ 0 5517.18 5463.I8 N66,00W 97,0~ N 5673 18 0 5604.92 5550.92 N66,00W 108,29 N 5755-"Z8-""i-~---5692.35 .... 5638.35 N65.0OW .... 120.16 N 5859 18 ~5 5781.50 5727.50 N65.00W ~32.76 N 5953'-l'9 15--5870,37 ..... 5816.37 "'N65.00W 1~5.?0 N 60~7 ..... 19 30 ........ 5959.05 ..... 5905.05 N64.00W 159.12 N 61~0 lg 15 6046,78 5992,78 N64,00W 172.65 N --623'2-20'-'0 ...... 6~33,44" 6079.4~ N63.00W '-186,~3 N 6325 20 0 6220.83 6166.83 N63.00W 200,8? N 6~17 20 0 6307,28 6253,28 N63,00W 215,16 N .......... 6510 20 0 6~94.67 63~0,67 N63.00W 229.60 N ............ 6603 19 45 6482.13 6428.13 N64,00W 243.71 N ...... 6696 19 45 '6569,66--6515.66 N64,00W --'257.~8 N .... 6?90 19 45 6658,13 -'6604,13 'N64.00W 271.41N ---6883 19 30 6745.73-'6691.73 N65.00W 284.85 N '69-?~-20 ...... 0-' 6831'38 5777.38 NG~.OOW "298.09 N 845.57 W -~'06'~"20'-0- 6919.71 - 6865.71 NG~.OOW 312.19 N '874.47 W .... ~'i61 20 '0 7007.10'-'6953',10' NG~.OOW 326.X3 N 903.06 W ..... 7253 20 -0"-?093.55" 7039,55 NG~.OOW 339.92-N 931.3~ W 276.51 302.4~ 328.~1 35~.60 380.17 aO4.92 ~30,20 455.48 481.52 508,55 536,29 564.43 592.16 619.82'W 648.16 676.19 704.53 732.83 761.08 789.62 817.82 1-7'1.48 N 86 28 4 W 0,620 198.27 N 85 2 25 W 0.570 225.62 N 83 52 ~1 W O.281 252.55 N 82 58 36 W 0.314 279,15 N 82 6 55 W 0.636 305.99 N 8i 15 53 W ' 0.31z+ ~33.01 N 80 27 56 W 0.285 360.45 N 79 39 39 W 387.50 N 78 50 12 W 413.90 N 78 2 19 W 4~1.01 N 77 17 19 W ~68.17 N 76 37 33 W 496.29 N 75 59 17 W 525.60 N 75 22 6 W 555,73 N 74 ~8 2 W 586.~4 N 74 15 21 W 616.82 N 73 ~4 ~ W 6~7.25 N 73 15 32 ~ 678.57 N 72 4.6 50 W 709.60 N 72 20 57 W 741.00 N 71 56 58 W 772.29 N 71 36 17 W 803.45 N 71 18 30 W 834.97 N 71 1 51 W 866.01 N 70 47 ~5 W 896.58 N 70 34 49 W 928,52' N 70 2), 11 W 960.14 N 70 8 35 W 991.4~ N 69 56 54 W 0.531 0,638 0.326 0.266 1,087 0.292 0.532 0.532 0,26g 0.825 0.000 0,000 0,000 0.296 0.000 0.000 0.294 0.56z~ 0.000 0.000 0.000 157.77 18" 30 2. I37" 237.95 264.39 291.2~"' 31B.35 3~6.0~ 373.53 ~00.~7 ~28.12 455.76 ~84.36 54~.77' 575.94 606.80 637.69 6 .~50 70~.97 ?32,77 76~,39 795.81 827.58 858,81 88.9,55 -' 921,70 953,50 98~.97 MAGNETIC MULT]SHOT' $~R'VEY NOV, 21~ 1977 .................................. RECORD OF' SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER .............................. TRUE -~E-A'~--DRIFT'VERTICAL .......... ~UB ....... DRIFT --DEPTH-ANGLE DEPTH SEA' DIREC [ M DEG, --7"3~'6 ..... 20 ....... 0 ........ ?~'80';94 ..... 71'26.94 N64.0OW 7438 19 45 7267,46 7213,46 N65.00W 7531 19 30 7355,06 7301,06 N63,00W TOTAL COORDINATES C L 0 5 U R E 5 D[STANCE ANGLE O M $ 353.87 N' 959',93 W' 1023.08 N 69 45 50 367,33 N 988,16 W 1054,22 N 69 36 28 W 381,02 N '-'1016.23 W "'1085,31N 69 26 48 W 7625 19 0 74a3,81 7389,81 N62,00W 395,33 N 1043,72 W ....... 7718 19 0 7531.74 7477,74 N62,00W 409,55 N 1070.45 W ~81'1 .... 18 ...... 30 ........ 7619,80 ......... 7565,80 N62.00W 7905--18-'~5 ..... 7709'01 .... 7655,01 N61,OOW ..... 799E 17 45"- 7797,66 '-7743,46 N60.OOW 8091 %7 30 7886,09 7832,09 N58,00W .... 8.1.84 17 15 7974,85 7920,85 N57,00W : 8277-"16 ~5 .....8063.78 ....... 8009,78 ..... N55,00W ~B'~l-i6 .... 0 ...... 8153,97 ..........8099,97'- N53'OOW . ...... 84~'5-'15-~5 ..... 82~4'"39 .......... 8190,39 N51.OOW ~'8558-- 15---0 .... 833~'Q6 ..... 8280,06 N46.00W 865'2 ....1~"~5 ....... 8~2~.9i .... 8370,91 N43,00W 423,58 N 1096,85 W 437.72 N 1122,89 W 451,87 N 1147,90 W 466,37 N %172,03 W 481.30 N 1195.46 W 496.50 N 1218.00 W 512,08 N '"1239,44 W -_ 527,91N 1259.70 W _. 544,2~ N 1278,16 W 561,~5 N- 1~95,07 W ...... 8746- 14 0 8515,96 8461,96 N41,OOW. 578,79 N' 1310,68 W ..... 8840"1'4 .... O' 8607,17 8553,17 N39.00W --893"1--14 .... 0 ..... 8695.~7 "8641,47 N39.00W 9024 1~ 0 8785.71 8731.71 N~O.OOW 9118 14 0 8876,91 8822,91 N39,00W 9212 1~ 0 8968,12 891~,12 N39,00W 9305 14 0 9058,36 900~,36 N39.00W 9335 14 0 9087,47 9033,47 N39,00W 9430 1~ 0 9179,65 9125,6~ N39,00W '"9~50 .... 1~ 0"'9199,05 9145,05 N39,OOW 596,21 N 1325,30 W 613,32 N' 1339,16 W 630.68 N 1353,47 W 648,'2~ N 1367,93 W 665.90 N 1382,24 W 683.38 N 1396,40 W 689,0:~ N 1400.97 W 1116.08 N 69 15 16 W 1146.12 N 69 3 ~+7 W 1175,80 N 68 53 3 W 1205,19 N 68 42 11 W 123-3,64 N 68 30 45 W 1261.42 N 68 18 ~+ W 1288,71 N 68 4 1~ W 1315,3~ N 67 49 20 W 1341,06 N 67 33 6 W 1365,84 N 67 15 45 W 1389.20 N 66 56 8 W 141ie54 N 66 ~3 42 W 1432,79 N 66 10 26 W 145~,24 N 65 46 42 W 1472.92 N 65 23 3~ W 1~93,20 N 65 0 ~6 W 1513,75 N 64 38 41 W 1534.28 N 64 16 38 W 1554,66 N 63 55 23 W 1561,2~ N 63 ~8 39 W 706,88 N 1415.43 W 1582,13 N 63 27 42 W 1418.48 W//1586,54 N 63 23 21W 710.64 1586;5/+ FEET AT N 63 23 2i w ,. DOG LEG SEVERITY DEG/IOOFT 0,000 0.299 0,360 0,544 0,000 0,538 0,286 0,547 0.332 0,285 0,567 0.814 0.309 0.883 0,337 0.808 0.515 0,000 0.260 0,257 0.000 0.000 0,000 0,000 0,000 SECTION DISTANCE 1016.77 10~i05 10'. 28 1110.26 11~0.53 1170,42 1200.03 1228,73 1256.~1 1284,43 1311,40 1337,54 1362e74 1386,56 1409e~9 14&1.12 1451.99 1472,03 1~~ !60 151~ 39 153~.10 1554.59 1561,20 1582,13 1586,54 '--A-~O-'-DS-g'18 MAGNETIC MULT'XSHOT SURVEY --~'~'AS'URED"-DEPTH'AND'-OTHER'-DATA FOR EVERY EVEN' 100 FEET' OF ,SUB ,SEA-DEPTH. NOV. 21, 1977 TRUE ~EASURED ................ VERTICAL SUB .... MD-TVD DEPTH DEPTH SEA DIFFERENCE VERTICAL CORRECTION TOTAL COORDINATES _ 154 154. 100 0 0 254 ....................................... 254. ........... 200 ............. 0 0 35/+ 35/+, 300 0 0 454 454, 400 0 0 554 55~, 500 0 0 654 654, 600 0 0 ~5~ ~5~* ?00 0 0 ...................................... 85~ 85~, 800 0 0 95~ 95~. 900 0 0 X05~ ~05~ ~000 0 1254 1254, 1354 1354. 1454 .................... 1454,._ 1554 1554- 1654 1654, 17 34 1754, 1854 1854, 1954 195a, 2054 .................... 205~, 2154 215~. ........................ 2254 2254, ............................... 2354 2~54, 1100 0 1200 0 1300 0 1400 0 1500 0 1600 0 1700 0 1800 0 1900 0 _ __ 2000 0 2100 0 2200 0 _ _ 2300 0 ' '-0 0 0 0 0 0 0 0 0 0 0 0 2454 2454. 2400 0 0 2554 2554. 2500 0 0 2654 ...............2654' ..... 2600 - 0 ......... 0 2754 ...............2754,' ' 2700 0 0 -2854 ....................... 2854' 2800--- 0 ............ 0 295'4 .................... 2954-, .... 2'900 ...... 0 .......... 0 3054 3054. 3000 0 O. 3154 ........... 3154, 310'0 0 0 ............ 3254 .............. 3254, 3200 ..... 0 ............. 0 3354 ................ 3354, -- 3300-' 0 ...................... 0" ............ 3454 ................ ..... 3400 .... o ............... 0- 3554 3554, 3500 0 0 0.08 0.21 0,42 0.70 1.04 1.44 1.86 2.25 2,~3 2,98 3.31 3,64 4,01 4,4 1 4,83 5.26 5e69 6,13 6,61 7,11 7.60 8,04 8.40 8.63 8,73 8,66 8,38 8,23 8,22 8,30 8,50 8,74 9,18 10.03 11.27 0.02 E 0,05 E 0,11 E 0.18 E 0.27 E 0,39 E 0,53 E 0.72 E 0,94 E 1.20 E 1,48 E 1,76 E 1.99 E 2.17 E 2,29 E 2,36 E 2.36 E 2.32 E 2,36 E 2,53 E 2.82 E 3,25 E 3.80 E 5,15 E 5,88 E 6.65 E 7.40 E 7.86 E 8,43 E 9.28 E 10,11 E 11,13 E 12.10 E 12,48 E' -ARCO-DS-9-18 ................................... MAGNETIC MULTXSHOT SURVEY ~Ei*SURED..iDE~.TH.'AND._OT-'ERi"DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. NOV, 21, 1977- TRUE --'~EASUR'E~ ............. ~ERTICA'C' SUB MD-TVD DEPTH DEPTH SEA DIFFERENCE . ._ VERTICAL CORRECTION TOTAL COORDINATES ............ 365 ........................4 3654'-,' ...... 3600 3754 3754, 3700 ......................... 3854 ............ 3854, _ 3800 ................. 3955 ........................ 3954., ....... 3900 4(_.; 6 ................................. 4054, .......... 4000 4;i. 58 4154o 4100 ~365 ~35~, ~300 ~678 ~65~, ~600 ~887 ~85~ 4800 ~92 ~95~ ~900 5096 505~, 5000 5201 515A. 5100 5305 525~, 5200 5~10 5B5~. 5300 5515 5~5~. 5~00 5620 5555. 5500 5725 565~, 5600 5936 5855e 5800 6052 5954, 5900 ........... 6~48 -6054. 6000 6254 6154, 6100 6360 6254, 6200 6467 6354, 6300 ............ 6573 - 6454, .... 6400 6679 6554, 6500 6786 ~654. 6600 ...... 6892 6754. 6700 6998 6854. 6800 72~ ........... 7054, - 7000 3 14 19 23 28 38 42 46 51 56 . 61 65 7O 75 81 87 93 100 106 6 1i3 ' 7 119 6 125 6 132 7 137 5 144 7 150 6 15'7 ............. 7 0 0 0 0 1 2 3 4 5 5 5 5 5 5 5 5 5 6 6 6 7 12,55 5 12,56 5 10.78 S 8,42 S 7.06 5 7.92 5 8,35 5 4.94 $ 0,13 N 5.82 N 12,34 N 20,01 N 27.60 N 35,66 N 44.67 N 54,36 N 64,90 N 76.65 N 89.14 N 101,67 N 114,87 N 128,84 N 143.28 N 158.34 N 173.75 N 189.83 N 206.31 N 222,88 N 239.23 N 254.96 N 270.76 N 286, 09 N 301,69 N 317.58 N 333.61 N 12.54 E 11.36 E 6,20 5 3,83 W I8,58 W 38,49 W 63,02 W 91,00 W 119.93 w 149.18 w 178.70 W 208.40 W 238.21W 267,71 W 296.88 W 326,10 W 355.16 W 383,99 W 412,46 W 440.62 W 470.07 W 500,14 W 531.12 W 562e83 W 594,43 W 626,48 W 658.82 W 691e34 W 723,71 W 755,91W 788,29 W 820.47 W 852.95 W 885.53 W 918;4o w . . . "'ARCO DS 9,-['8 ...... MAGNETIC' MULTiSHOT; SURVEY NOV. 21~ [977 -'~"EA'$URE[' DEPTH'AND-'OTHER"DATA FOR EVERY EVEN 100 FEET OF'SUB SEA DEPTH. ..................... TRUE MEASUREI~ .......... VERTICAL ..... ,.%UB MD-TVD '"VERTICAL DEPTH ............... DEPTH SEA-DIFFERENCE-' CORRECTION TOTAL COORD JNATE,5 7 .............................317 7'154'~ .... 7100 7424 725~, 7200 ~r53.0 ............................... 7~54'"' ...... 7300 76'~ ............. 7454-, ........... 7400 163 ...................... 6 170 ..... 7 176 ..... 6 182 ........................ 6 ~49,52 N 951.01 W 365.28 N 98'3,77 W 380,85 N 1015.89 W 396,98 N- - 1046,82'W ........ 77~Z 755~-. ........ 7500 ......... 188 .............................. 6 7952 7754. 7700 198 5 ~44.87 N 1135.6~ W 8057 7854, 7800 20~ 5 461,00 N 116~,~1 W 816.2 .................. '795~, 7900 208 5 ~77,75 N 1189,97 W 8267 ...................... 8"0'5~"~ ............ 8000 ......... ~13 ............ 5 ..... ~9~8i N lZ15,58 W 8371 g~54'" .......... 8'100 .......... 217 a 512,08 N 1239,~ W 8~75 825~, 8200 221 ~ 529,6~ N 1~61,79 W 8579 8354, 8300 225 4 547,97 N 1281,97 W 8682 8454, 8400 228 3 567,02 N 1300.21 W 8785 855~~, .......... 8500 231 3 585','96 N 1316,82 W 8888 8654, 8600 234 3 605,23 N 8991 8754, 8700 237 3 624~5~ N 909~ 885~, 8800 ~0 3 . 643,7~ N 9197 .................. 8954`.' ........... 8900 --2~3 ............ 3 ..... 663,08 N 9-4~6~ ...................... ?..!}~'~;~.'_.'~3.'-91 O0 ~'~'; .250' '~"_'..~_~'-'_~ _~ ..~.'~; ~-~4_' .... . "~_ -..'~, "_"~ ;'.'~. ~;0 !'91 N 133Z.61W 1348,35 1364.27 W 1379,96 W 1395,6~ W 1'411.41 W ................................... TRUE MEASURED VERTICAL SUB DEPTH DEPTH SEA 1000 999, 2000 1999, 3000 2999, 4000 3998* TOTAL COORDINATES 2,79 $ 1,05 E 8,2~ '5 8~07 E 7,58 $ 9.81W 60'00 59Z~. 5860, ~52.33--N ............... 55'0'3~' 'W"' / ....................... 70.~0 ........................... ~855.. ........ 680z. 30z.99 N 853.5~ w.~,,. ..... 8000 7799. 7745, a52.18 N 11~8,~3 W y~ ....................................... _ . 9000 8762e ............. 8708e 626"22 N Z3'49,7~ w NOV, 1977 2400' VERTICAL SECTION 1600- 2000 2800- SCALE I"=1000' ATLANTIC RICHFIELD COMPANY DRILL SITE 9- 18 RADIUS OF CURVATURE MAGNETIC MULTI-SHOT ' . · ! i ALL DEPTHS SHOWN ARE TVD TVD= 9 199' TMD = 9450~ HORIZONTAL _VIEW SCALE 1"=500' ATLANTIC RICHFIELD COMPANY DRILL SITE 9-18 RADIUS 'OF CURVATURE MAGNETIC MULTI-SHOT TVD= 9199 TM D = 9450 LOCATED IN THE APPENDIX [21 WFL [221 IPR LOG UI CALIPER SURVEY [~ VOLAN ~CURVE DATA ~ STRATIGRAPHIC HIGH RESOLUTION DIPMETER OTHER: E~PAR~ ~ NA~ RES0b~CES Divisicm of Oil and Gas Cc~servatiom November 22, 1977 BOP Test c~ Arco' s DS 9-18 Sunday, November 6, 1977 - I departed my h~me at 4:00 PM for a 4:30 PM ~-'and 5:3~0 .~ ~ via Wien flight #19 for De___~_~horse., arriving via Fairbanks at 8:00 PM. Vernc~ Blair, Arco drilling foDeman, met m~ at the airport and we arrived at drill site #9 at 8:45 t~. Initial pttzI~Dse of this trip was a BOPE test on DS 9-18. Con~ drilling rig was Rowan rig ~34 whose too ~ .1~ was Orvin Graff. Nippling up was in progress. ~, ~_..7, !977- Tests began at 12:30 PM, with shoe cn 13 3/8" at 2714'. '-Two '~'~ pimp and diesel w~re utilized in pressuring. Annular pressure tested to 3000 psig. I~$~r pipe rams, inside valve on th~ kill line, t/lree plug valves in the choke manifold and lower kelly valve tested to 5000 I~ig. Kelly oock, outside valve on the kill line and inside valve on the choke line then tested to 5000 psig. Blind rams, to 5000 psig. Ten addi~~ valves and t~anty-s~ flanges in the ~hoke manifold tested to 5000 psig. The Swaco superchok~ ~as actuated fully open and fully closed and the manual adjustable choke was free Aocumu/atzTr pressure was 3000 psig and N9 backup bottles tested 1900, 2000, 2000 and 2000 psig. Both dart and ball ~wpe floor valves were in place before ~e drawwor~. The location was ~11 organized, rig in good repair, reserve pit well built, but the well sign had not been received. Tests ~ concluded at 4:30 PM and a field activity report prepared with the original given to Ve~x~ Blair, a oopy mailed to Bob Hines, and a copy attached to this re~. At 8:00 PM Nelson ~, wirel~ coordinator for BP, picked n~ up and I arrived at BP operations at 8:45 PM. and SSSV's oa BP s D-4, D-5, J-9. ~ ~s~ay,.__}.~ 9,...'19~7 - Tested SSV's and SSSV's cm BP's D-l, D-3, D-7, / ? ~k~be~ 22, 1977 Sa~,~ 12, 19~77- I d~parb~d Deadhor~ via BP charter at 1:00 PM, ~t~2:30 t~ ~ at my hcme at 3:00 1~4. ~: I witp~sed ~sful ~ test on Aroo's DS 9-18. At~t ' Yes No ~te~::~(~ocation,General - Yes ~o Item {~OPE lests ( ) (~' ~::Well S~n (~ ( ) 15..'.~Cas~n~ set {~ ( ) "2.:.~aeneral .ousekeepin~ {~ ( ) 16. ~ fluid-{ )~t~ )mud ~ o51 (~),' (). (tO"() () () () (.) () () () () () () () () () () () 4~ Rig. ( ) safetY Valve Tests 3~Reserve Pit-( )open( )filled 5. Surface-No. Wells 6. -Subsurface-No. Wel 1 s ( ) Well Test Data 7. Well Nos. , , 8. ~Hrs. obser , , 9. BS&W , , , 10. Gr. Bbls. ( ) Final 2;bandonment 11. P&A Marker (~() (~)~ ( ) (~' ( ) (~() (~)~ ( ) (~-() (~- ( ) (~r() (,~() 12. Water well-( )capped( )plugged (v)' ( ) 17. Master Hyd. ContrOl Sys.~o~.psig 18. N2 btls~]~l:~~~m~_~,~slg 19. Remote Controls 20. Drilling spool-_~k__"outlets 21. Kil 1 Li.ne-(~J~ Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs/~-flgs~ 24. Chokes-(O~f~emote( )P,os.(-~j. 26. Test Plug~(~)~ellhd( )csg( )none 26. Annular Prevent'er;~:~,,,:,~si.~ 27. B1 ind Rams~~. si ~ 28. ~ ~p ", "~ 'Pipe Rams ~.~ Slq ~:.,,;" 29. Kelly & Kelly-cock~;?,oc~ psig ( ) ( ) 13. 'Clean-up (~,~ ( ) 30. Lower Kelly valve~,~p~:~,;~:::~, psio (). ( ) 14. Pad leveled (~)~ ( ) 31 Safety Floor valves-:-(- ~BV [~'D'art Total ins.pection observation time~_~hrs/da~ Total number leaks and/or equip, failures ~ Remarks ,, ~T/~o~.z~ ~- ";,",~'~ ~ days or when ready f~ t~ Inspected by ~.~. ~ )~.~.~ ......~ .... Da ~? C. ~ Bay ~ 9-18(xx-~--10-~) Atlantic Richfield Pexmit ~. 7-39 Att~t~c ~~ ~ P. O.~~0 Anchc=~, A/aska 99510 Enc~ is ~ ~ ~lication ~ pen~t %o drill the ~ referenced Well at a locat~ ~ ~ 2, ~p ION, ~ 15E, L~ Many rivers ~ Alaska ar~ ~ dra~ ~ have been classified as important for ~ s~~ or migra~d~m ~f anadr~ fish. Oparati(ms in ~~ ~ ~ subj~ %o/kq 16.50.870 ~ ~ requlaticns pr~ated ther~ (Title 5, ~ administrati~ OxY). Pri~ ~o ~ing opera~ ~ ~ ~ ~x~ta~ced ~ ~ Habitat Coordinator's office, Depart- n~nt of Fish ~ G~. Pollu~ion of ~ ~a~s ~ ~ State ~ p_~ohibited by AS 46, Chapter 03, Article 7 ~nd ~ regulations ~gated ~here~ (Title 18, Alaska Administrative ~, CP~ 70) ~ ~ ~ F~1%~ter Pollut/mn Control Pursuant %o AS 38.40, ~1 ~ Undm_r State I~ases, ~ Alaska De~t of ~-ebor i~ ~ ~~ of ~ issuance of this Fa~mit to drill. ~ ~ ,as ~ sd~eduling field ~, we w~ald appreciate your notifying.~, this office within 48 bx~rs after ~ ~11 is ~. $.~ would also like to be r~~ ~ ~ a repre--senta.ti~ of ~ Divis~ may be present to witness ~ ~ blowout preven%ar equ~nt before surface casing shoe is drilled. P. B. ~ 9-18 -2- June 15, 1977 Ln ~ ~ of suspens~ or abar~k~t please give this office adequate ~ ~ficatic~ so that ~ may have a witness present. ~closure Deloar~mt of Fish ~ Czme, Habitat Sec+ion w/o emcl. ~t of En~ C0nserva~on w/o encl. DeparUmmt of ~, Supervisor, Labor Law Compl~ Divisiom w/o ~1. Form 10-401 REV. 1-1-71 ' SUBMIT IN TRd VfE i (Other instruc, STATE OF ALASKA OIL AND GAS CONSERVATION COMMIT-FItEl! PERMIT TO DRILL OR la. TYPE OF WORK DRILL E~ b. TYPE OF ',','ELL OIL [~ GAS L~' ,~'ELL WELL OTHER 2. NAblE OF OPERATOR Atlantic Richfield Company DEEPEN A. 3. ADDRESS OF OPERATOR P. O. Box 360 Anchorage, Alaska 99510 SINGLE .~ MULTIPLE ZONE ZONE [~] 4. LOCATION OF WELL ^tsurf,~ce642,N & 224'E of SW cr Sec. At proposed prod. zone 1 370' N & 1 320' W of SE l, TION, R15E, UM cr Sec. 2, TION, R15E, UM 13. DISTANCE IN blILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Approximately 6½ miles northeast of Deadhorse, Alaska API No...50-029-20259, 5. 6. LEASE DFSIGNAIION AND SERIAL NO. ADL 28327 7. IF INDIAN ALLOTIEEOR'EP~BE NAME 8. UNIT FARM OR L~ASE NAME Prudhoe Bay 9. WELL NO. Drill Site 9-18 (xx-2-10-15) 10. EIELD AND POOL, OR WILDCAT Prudhoe Bay Field D,~,, ,4 t.,,-, ,~ FI4 '1 .. 1 l.' s~,~!.'g. St.. Pt~5~o.tI v v · HOLE OBJECrlVE~ Sec. 2 TION~ R15E 12. 14. BOND INFORMAFION: nr~E S tat ewi des.~etv ~nd/o~ No. F e de ra I 15. DISTANCE FRObl PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. 391 0' (Also to nearest drig, unit, il' any) Insurance Co. #8011-38-40 !. No. OF AC~q IN LEASE I,, ': 2560' .' 19. PROPOSED DEPTH -I 9717'MD 9221'TVD 15. DISTANCE FROM PROPOSED LOCATION 21. TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2750' ELEVATIONS (Show whether DF, RT, CR, etc.) 21' Pad El'evation (Gravel) Amount $100,000.00 NO,ACRES ASSIGNED TO THIS WELL 160 20. ROTARY OR CABLE IOOLS Rotary 22. APPROX. DATE WORK.~,ILL START Dec. 25, 1.977 23. PR( ~POSED CASING AND CEMa'TING PROGRAM .... S;ZE'OFi ...... ' ..... :" HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Qua ntity of cement , . , - i, .20'" . , 94# H.'Z40 100,'+ Circ to 'surf aoDrox 500 SX . ,. 177.1/2",~ 13-3/8" ..... . ,.7.2//, , , N-80 2700'7_~ Ci'r,c to surf a~brox.. 5500 sx _ 12-1/4" . 9-5/8" t ...47#. N-80 qfiO0'+ 2BO0'+ cmt .col,~mn on 1st ~ta9~.l~ '. & [so0-q.q . - ,_ gOO + cml nn ?nd qtao~ 195+ cml Atlantic Richfield Company prposes to directionally drill this well to 9717'+ MD, 9221'+ TVD to produce the Sadlerochit zone. logs will be run across selected intervals. A 13-5/8" 5000 psi Hydril and 13-5/8" 5000 psi pipe and blind rams will be used on the 13-3/8"' casing. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5½" 17# N-80 tubing, packer and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to- deepen give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give Ferfinent data on subi~face locations and measured and true vertical depths. Give blowout preventer pro.am. SX 24. I hereby'certify that the Foregoing is True algt Correct DATE mLEDist. Drilling Engineer (This space for State office use) SAMPLES AND CORE CHIPS REQUIRED UYES ~ NO DIRECTIONAL SURVEY REQUIRED ~] YES [] NO CONDITIONS OF APPRG'.'AL. IF ANY: PERMIT NO. 77-39 APPOVED BY blUD LOG [] YES 5~ NO OTHER REQU!AEMENTS: A.P.I. NUMER.:CAL CODE *See Instruction On Reverse Side 50-029-20259 .APPROVAL DATE,. June ] 5:1977 Chairman June TITLE DATE 15, 1977 200' 224.' 250' LC. I S SEC. 12 Well IG ~, {DWell I-/' ,WelilS~' · Well · Well 20 'I ' ,\ CERTIFICATE OF SURVEYOR I HERE BY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. Surveyor / Surveyor / Ab DUILi yvr"LL WELL t, io. I;3 LAT. 70° 142 4-6.838"Y 5 9~2 815.87 06.527"X 718 4.56.54- LONG. 148° 14.' WELL Mo. LAT. 70014,' 4.5.684."Y 5 94.2 LONG. 148°14' 05.804"X 718 WELL No. 14' LAT. 7001 4-' 44'.532"Y 5 94.2 LONG. 14'8°14.' 05.073"X 718 WELL No. 4.' 43.377~Y 5 94'2 LAT. 70° 14,, LONG. 148° I 04.552 X 718 WELL No. 16 LAT. 70° 14.' 42.221'~'Y 5 942 349.60 LONG. 14'8° 14-' 0'5.613 X 718 570.52. WELL No. 17 4.' LAT. 70° 14, 4.1.065" Y 5 94.2 232.79 LONG. 14''8° I 02.89:5" X 718 598.50 WELL NO. 18 LAT. 70° 14' ;59.910" Y 5 94'2. i i 6.14 LONG. 148° 14'02.176" X 718 626.56 WELL NO. t9 LAT. 70°14.; 58.760',;Y 5 942 000.01 LONG. i 4-8 o 14' 01.4.4'2 X 718 G55.18 WELL No. 2.0 LAT. 70° 14'37.606" Y 5 94.1 883.42 LONG. I4'8 14'00.721" X 718 683.57 699.30 484.81 582.98 515.32 466.50 541.52 No. ' ..... HVL'Ho' 3~9 DS'gzJ77 ATLANTIC RICHFIELD CO. AS BUILT DRILL SITE No. 9 WELLS No. 12,13 8~ 14 LOCATED IN PROTRACTED SECTION I,T. ION.,R.i 5 E,U.M. PREPARED BY HEWIT'r V. LOUNSBUEY & ASSOC. '723 W. 6?h AVENUE ANCHORAGE I.ALASXA IJ DATE F..._E._.B: 19.._7 7 SCALE I"= 200' CHKD BY PC FIELD BK. ,,' .... ., _ . . ., .~:. .... · , , ' ,',.;i CHECK LIST FOR NEW WELL PERMITS Company ;:~-~. fC~ Yes No Remarks 1. Is the permit fee attached ..................... /~ Lease & Well No. 2. Is well to be located in a defined pool .............. %~y< 3. Is a registered survey plat attached ............. 4. Is well located proper distance from property line ......... ~< 5. Is well located proper distance from other wells ......... ~< 6. Is sufficient undedicated acreage available in this pool ...... ~ 7. Is well to be deviated ..................... ~=.~ 8 Is operator the only affected party .... v=~>~<_ 9. Can permit be approved before ten-day wait .......... 10. Does operatOr have a bond in force . . ll. Is a conservation order needed ................ t2. Is administrative approval needed ................ 13. Is conductor string p~ovided .................... 14. Is enough cement used to circulate on conductor and surface 15. Will cement tie in surface and intermediate or production strings 16. Will cement cover all known productive horizons .......... 17. Will surface casing protect fresh water zones .......... 18. Will all casing give adequate safety in collapse, tension & burst 19. Does BOPE have sufficient pressure ratino.. - Test to .~,,, © psig 20. Has DMEM approved Plan of Operation ............ Additional Requirements' Approval Recommended' G~eol ogy_: Engineer i ng' HWK ~ LCS ~ ~ RAD -~75.~:~ Revised 11/17/76 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. LIBRARY TAPE CURVE SPECIFICATIONS Company Arco Oil & Gas Co. Well ' DS 9-18 Field Prudhoe Bay County,State North Slope, Alaska Date 3-6-81 Curve Name (Abbreviated) Standard Curve Name Logs Used Scale GR1 Gamma Ray .... DDNLL 0-!00 GR2 Gamma Ray DDNLL ._ " GR~. Gamma Ray DDNLL ,, GR4 Gamma Ray ...... DDNLL ...... " GR5 Gamma Ray DDNLL ,, GR7 Gamma Ray DDNLL ,, ., Gll Gate 1 DDNLL 0-30 Gl2 Gate 1 " " Gl3 Gate 1 " " Gl4 Gate 1 " " Gl5 Gate ~ " " G17 Gate 1 " " G21 Gate 2' DDNLL 0-5 G22 Gate 2 " " ,. G23 Gate 2 " " G24 Gate 2 " " · _ G25 Gate 2 " " G27 Gate 2 " " LIBRARY TAPE CURVE SPECIFICATIONS Company , Arco Oi'1 & G~s Well DS 9-18 Field Prudhoe Bay County,State North Slope, Alaska Date 3-6-81 Curve Name (Abbreviated) Standard Curve Name Logs Used Scale ,, SGM1 Sigma .... DDNLL 60-8 SGM2 Sigma " ,, SGM3 Sigma ..... ,, ,, SGM4 Sigma ,' ,, SGM5 Sigma ,, ,, SGM? Sigma ,, ,, RAT1 Ratio DDNLL 10-0 RAT2 Ratio " ,, ,. RAT3 Ratio " ,, RAT4 Ratio ,' ,, RAT5 Ratio ~ ,, ,, RAT? Ratio " ' ,, MON1 Monitor DDNLL 0-120 MON2 Monitor ,, ,, MON3 Monitor ,' ,, MON4 Monitor " ,, · MON5 Monitor ,' ,, MON7 Monitor ,, ,, NLL Sigma Average DDNLL 60-0 LIBRARY TAPE CURVE SPECIFICATIONS 0/o Company .A.~C._o- iALASKA, INC. .... Well D.S. 9-18 Field Prudhoe Bay County,State North Slope, Alaska Date 1-19-81 Curve Name (Abbreviated) Standard Curve Name Logs Used Scale 0-100 0-120 0-60 0-10 60-0 11-1 0-100 0-t20 0-60 0-10 60-0 11-1 0-100 GR1 MON 1 Gll G21 NL] CR~ MON 2 G12 G22 NL2 RAT2 GR3 Gamma Ray Pass ,Monitor Pass 1 Gate One Pass Gate 2 Pass Sigma Pass Ratio Pass 1 Gamma Ray Pass 2 · Monitor Pass 2 Gate One Pass 2 Gate Two Pass 2 Si,gma Pass 2 Ratio Pass 2 Gamma Ray Pass 3 Monitor Pass 3 DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL DDNLL MON3 DDNLL 0-120 C13 Cate One Pass 3 DDNLL 0-60 Gate Two Pass 3 DDNLL G23 NL3 RAT3 GR7 MON 7 Sigma Pass 3 DDNLL Ratio Pass 3 Gamma Ray Pass 7 Monitor · " " 0-'10.~. 60-0 11-1 0-100 0-120 L I B F_~_RY TAPE CURVE SPECIFICATIONS CompanM Well Field ~ARCO ALASKA,. IN~. . II D. S. 9-18 PRUDHOE BAY County, State N. SLOPE, ALASKA 1-19-81 Date Curve Name (Abbrev.) Standard Curve Name Logs Used Scale GR4 GAMMA RAY PASS 4 DDNLL ~ 0-100 , 100-200 MON4 MONITOR PASS 4 " 0-120 NL4 SIS.MA. PASS 4 .... " 60-0 ,, , Gl4 GATE ONE PASS 4 " ' 0-75 G24 GATE TWO PASS 4 " 0-12.5 RAT4 RATIO PASS 4 " 11-1 GR5 GAMMA RAY PASS 5 " O-100 , 100-200 ' MON5 MONITOR PASS 5 " 0-120 NL5 SIGMA PASS 5 " 60-0 ~ Gl5 GATE ONE PASS 5 " 0-75 G25 GATE TWO PASS 5 " 0-12.5 ,1 " NLL AVERAGE SIGMA " 60-0 , ,, DIFL Gl7 ,, ,Gate One, Pass ,7 " 0_75 , G27 Gate Two Pass 7 ~'¢'~' ~ ~- ~ ..... 0-12.5 RAT7 j Ratio Pass 7 ~-[~? © <'% ~/!!~/~I~'~ 11-1 t NL7 Sisma Pass 7 %!~j~'_K~O:d,~ Gt~s Ct;~s Coi'~imi ssiop ...... o, ~, ~<?!!~.] 0-60 FILE=LA889 PROGRAM=LISTER ECC NUMBER ARCO ALASKA INC. D.S.9~18 17 CURVES : NLI NL2 NL3 NL4 NL5 NL7 GR1 GR2 GR3 GR4~ GR5 GR7 NLL NLLO NLHI HILO DIFL FROM 8751.BB TO g35B.l~ LEVEL SPACING 62. SAMPLES PER RECORD PAGE I ARCO ALASKA INC. D.S.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS Z PASS 3 PASS 4 PASS 5 PASS 7 AVG. 8752. B.88 8.88 8.88 8753. 8.88 8.88 8.88 8754. 8.88 8.88 8.88 8755. 8.88 8.88 8.88 8757. 8.88 8.88 8.88 8758. 8.88 8.88 8.88 8759. 1.88 8.88 1.88 8768. 1.88 8.88 8.18 8761. 8.18 1.88 8.88 8762. 1.18 1.88 1.88 8763. 1.88 8.88 8:88 8764. t.18 I.II 8.18 8765. 1.11 1.81 1.18 6774. I.II 8.18 8.11 6775. 8.18 1.88 8.88 8776. 1.18 8.88 8.88 8777. 1.18 8.88 8.88 8778. 8.88 8.88 8.88 8788. 8.88 8.88 8.88 8792. 1.18 1.81 8.88 8795. J.88 J.88 J.88 8797. 1.18 8.88 3'8.51 8798. 1.88 8.88 29.82 8799. 8.88 8.88 29.89 8.89999.99999.992.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999,99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.89999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.89999.99999.9 -8.89999.99999.9 8.89999.99999.9 8.89999.99999.9 8.89999.99999.9 8.89999.99999.9 8.89999.99999.9 8.89999.99999.9 8.89999.99999,9 8.89999.99999.9 8.89999.99999.9 1.89999.99999.9 8.89999.99999.9 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 1.89999.99999.9 8.88 8.89999.99999.9 8.88 8.89999.99999.9 8.88 38.5 38.5 8.838.51 29.8 29.8 8.829.82 29.9 29.9 8.829.89 PAGE 2 ARCO ALASKA !NC. D.S,9-.!8 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT,- PASS I PASS Z PASS 3 PASS 4 PASS 5 PASS 7 AVG. 8888, 38.21 28.71 38,04 29,34 3~,85 29,78 29,73 38,2 28.7 1.5 1.82 8881, 38,98 27,87 29.63 38,44 38,85 31,25 38,25 31.3 27.9 3,4 2,38 8882, 29,88 29,78 38,22 29,68 38,57 29,78 29,95 38,6 29.6 1,8 8,61 8883, 29.47 29,67 38.48 29.71 38.53 31,25 38,18 31,3 29,5 1.8 1.15 8884, 38,21 29.78 28.68 29,34 38,85 31,84 29,92 31,8 28.6 3.2 1.92 8885, 38.98 27,83 28.68 38,44 3~.85 31,51 29,98 31.5 27.8 3,7 2,87 8886. 29,88 29.41 29,38 29,68 3~.57 3~,33 29,84 38.6 29.3 1,3 8.72 88~7, 29,47 38,11 3~.51 29.71 3~.53 29,81 29,91 3g,5 29.8 1.5 8.98 8888. 29,76 29,63 29,82 38.88 31.88 -38,15 29,96 31,1 29.6 1.4 1,13 88~9. 28,26 28,68 29.89 38,74 3~.79 32,24 38,25 32,2 28.3 4,8 1.99 8818. 28,88 29,81 38.84 38.33 29.43 31,65 29,73 31,7 28.8 3,7 1.92 8811, 27,49 3~,8~ 29.63 38,48 28,91 38,88 29,69 38,9 27.5 3.4 2.21 8812, 28,33 38,74 38,22 32.24 38,24 38,29 38,29 32,2 28,3 3,9 1,96 8813, 29,91 29,82 38,48 29,71 38.27 38,77 38,15 38,8 29.7 ].1 8.62 8814, 27,68 29,41 28,68 38,~8 28.65 38,81 29,28 38,8 27.6 3,2 1.61 8815, 29,51 28,31 28,68 38,84 38,12 33,46 29,77 33.5 28,3 5,1 3.68 8816, 31,t5 28,13 29,31 29.78 38.86 31,]8 3~,18 31,2 28,1 3,1 2,85 8817, 29,88 25,96 38,81 29,23 38.49 29,56 29,68 38,8 26,8 4,9 3,72 8818, 38.17 27,57 31,84 28,31 28,91 29,3~ 29,24 31.8 27.6 4,3 2.68 8819, 29,62 27,21 32,87 27,57 29.79 29,~1 29,31 32,9 27,2 5,7 3,56 8828. 3~,68 26,73 31.91 27,61 29.82. 38,77 29.32 31,9 26.7 5,2 2,59 8821, 29,13 28,42 31,58 28,35 38,85 38,55 29,54 31.6 28,3 3.2 2,84 8822, 28,96 27,58 31,18 29,85 38.27 31,54 3~,86 31,5 27,5 4,8 2,56 8823, 29,36 27,28 31.62 32,21 38.68 29,26 38,~2 32,2 27.3 4.9 2.74 8824, 29,29 27,32 38,77 31,65 3~.28 29,81 29,74 31,7 27,3 4.3 2,43 8825. 38.21 29.88 29.68 29.68 28.18 28.42 29.19 38.2 28.2 2.8 1.01 8826, 28,66 29,81 26.31 29,81 29.17 28,53 26,77 29.2 28.3 8,9 8.46 8827, 27,74 29,81 28,97 29.93 29.57 32.32 29,45 32,3 27,7 4,6 2.87 8828, 27,78 29,74 29,19 38,81 38.24 33,28 38,98 33,2 27.8 5.4 3.28 8829, 29,58 29,19 29,52 29,96 31.88 33,.13 38,22 33,1 29,2 3,9 2.91 8838, 31,27 29,38 38,66 28,82 38.97 31,47 38.37 31.5 28.8 2.6 1.55 8831, 38,13 29,19 31,95 31,~7 29.87 29,63 38,24 31,9 29.2 2,8 1.71 8832, 38,28 28,71 38.78 38,29 29,98 28,27 29,68 38,7 28.3 2,4 1.33 8833, 29,47 29.88 38,18 27,72 28.43 38.18 29,28 38.2 27.7 2,5 1.56 8834, 28,81 29,19 29,96 29,23 38,57 3.~,66 29,74 38,7 28,8 1,9 8.93 8835, 26,14 28.6~ 3.1,51 29,49 31.81 3~,26 29,81 31,5 28,8 3.5 1,77 6836, 27,74 39,7~ 38,78 31,65 29,98 3~,41 3;,37 31,7 27.7 3,9 2,63 6637, 27,56 29,~4 31.65 38.~4 29.79 38.88 29,92 31,7 27,6 4,1 2.36 8838, 28,37 28,16 31,76 31,36 38.27 3~,11 38,J1 31,8 28,2 3,6 1.85 8839, 28,44 28,46 32,28 29,19 29.35 38,22 29,34 32,3 28,4 3.8 2,94 8848, 26.71 28,75 32.21 38.18 29,86 32,61 29,66 32,6 26,7 5,9 2,95 8841, 28,48 28,28 31,84 38,48 27.63 38,99 29,68 31,8 27.6 4.2 2.24 8842, 31.35 29,81 31,65 29.56 28,76 31,59 38,18 31.7 28.8 2,9 1.48 8843, 31,38 29,84 31.18 38.33 29.24 38,63 38,26' 31.4 29,8 2.3 1.22 8844, 38,87 26,36 31.36 38,59 28.58 28,97 29,72 31,4 26,4 5,8 3.36 8845, 29,32 27,24 31.14 29.63 29,79 28,46 29,26 31,1 27,Z 3.9 Z.81 8846, 28.92 27,35 29,67 38,96 38,46 27,39 29,15 31,8 27,4 3,6 1,88 8647. 29.32 27.28 27.83 38.96 38.75 28.49 29.12 31.8 27.3 3.7 1.84 8848, 29,32 29,85 38, I5 3~,48 38,42 38,59 38,17 38,6 29,3 1,3 8,84 8849, 29,36 29,78 31,65 3~,33 29,21 38,63 38,~6 31,7 29,2 2.4 1.68 PAGE 3 ARCO ALASKA INC D.S.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 885~. 38.5~ 29.34 38.29 31.43 28.91 31.83 38.24 31.4 28.9 2.5 1.33 8851. 38.18 28.28 28.42 29.84 29.68 28.93 29.85 38.1 28.2 1.9 1.85 8852. 28.51 26.21 29.63 29.45 28.36 29.84 28.78 29.6 26.2 3.4 2.57 8853. 28.22 27.21 38.48 38.26 zg.zI 28.01 28.84 38.5 27.2 3.3 1.64 8854. 29.18 27.24 29.63 38.74 38.68 29.85 29.74 38.7 27.2 3.5 2.56 8855. 38.24 26.83 28.98 31.69 29.83 38.29 29.71 31.7 26.8 5.7 3.68 8856. 29.25 25.48 27.98 29.56 27.92 3~.33 28.61 38.3 25.5 4.9 3.14 8857. 38.18 27.35 28.46 29.71 29.21 38.15 29.28 38.1 27.4 2.8 1.92 8858. 38.79 28.85 28.93 29.15 28.73 31.25 29.54 31.3 28.1 3.2 1.71 8859. 29.36 27.32 28.75 28.64 29,13 31.29 29,~0 31.3 27,3 4.~ 2.29 8868. 38.18 26.32 27.76 29.52 38.81 31.69 29,26 31,7 26,3 5,4 Z,94 8861. 38.82 26.95 28.16 31.58 28.88 38.48 29.32 31.6 26.9 4.6 2.37 8862, 38,28 26,76 27.79 38.74 27.22 31.65 29,~4 31.7 26.8 4.9 2,62 6863. 38.82 24.38 29.26 31.65 27.66 38.37 29.14 31.7 24.3 7.4 4.84 8864. 28.92 27.82 29.38 31.14 29.32 31.29 29.35 31.3 27.8 4.3 2.32 6665, 29,83 27,39 26,42 38,22 29,18 31,87 29.16 31,1 27.4 3.7 1.98 8866. 29.62 26.43 28.53 26.38 27.66 31.18 28.58 31.2 26.4 4.7 2.59 6867. 28.15 26.43 28.66 29.38 29.51 31.48 28.78 31.4 26.4 5.8 2.78 8868. 27.15 28.62 38.87 28.71 29.43 38.15 29.13 38.1 27.2 3.8 1.97 8869. 27.23 27.79 38.55 3~.59 29.28 38.88 29.24 3~.9 27.2 3.7 2.81 8876. 29.54 28.89 38.96 31.17 31.15 29.74 38.31 31.2 28.1 3.1 2.22 8871, 29.32 38.78 29.78 31.36 31.56 28.57 38,24 31.6 28.6 3.6 1.67 6872. 38.68 31.62 38.11 3-8.96 29.35 28.82 38.22 31.6 28.8 2.6 1.4~ 8873. 28.92 27.87 38.37 31.55 28.88 29.89 29.48 38.6 27.9 2.7 1.54 8874, 28.29 27,17 29.49 29.41 28.76 26.95 28.29 29.5 26.9 Z.5 1.34 8875. 29.88 29.78 38.15 29.15 29.65 25.63 29.58 38.1 25.6 4.5 3.96 8876. 28.15 29.19 38.15 29.89 38.38 28.85 29.22 38.4 28.1 2.3 1.17 8877. 27.26 29.78 27.83 29.23 28.84 27.58 28.36 29.8 27.3 2.5 1.42 8878. 29.62 27.54 29.96 29.74 28.62 27.68 28.75 38.8 27.5 2.4 1.21 8879. 28.96 27.94 29.41 29.~8 28.14 28.68 28.68 29.4 27.9 1.5 8.74 888~. 28.96 27.17 29.38 29.56 27.88 3~.29 28.84 36.3 27.2 3.1 1.67 8881. 28.33 26.69 31.~7 38.48 28.65 31.32 29.57 31.3 26.7 4.6 2.88 8882. 29.83 26,99 38,15 27.79 29.68 29.68 28,85 38.1 27,6 3,2 1,87 8883. 29.51 29.38 26.93 27.39 28.95 31.76 29.22 31.8 27.4 4.4 2.54 8884. 31.28 28.75 28.57 28.38 3~.82 33.~1 29.88 33.8 28.4 '4.6 3.13 8885, 29.47 38,88 27.61 28.28 38.27 29.38 29,17 38,3 27,6 Z.7 1,56 8686. 29.56 26.16 26.49 29.38 38.86 29.t5 29.26 38.9 28.2 2.7 1.66 8887. 27.96 27;39 29.38 29.67 38.89 38.~7 29.82 38.1 27.4 2.7 1.63 6888. 28.26 27.72 3~.11 38.77 31.85 29.49 29.79 31.9 27.7 4.1 2.87 8889. 29.32 38.11 29.~8 38.59 38.79 38.59 38.81 38.8 29.1 1.7 8.92 8898. 28.88 29.6~ 31.25 38.15 29.76 38.~8 29.88 31.3 28.9 2.4 1.37 8891. 27.63 29.93 32.28 31.65 28.69 38.99 38.17 32.3 27.6 4.6 2.54 8892. 28.63 29.81 31.43 32.83 29.96 29.89 38.13 32.8 28.6 4.2 2.71 8893. 28.37 29.34 38.63 32.58 31.88 32.21 38.77 32.5 28.4 4.1 2.48 8894. 29.83 3~.22 .38.48 31.21 28.21 3~.88 38.84 31.2 28.2 3.~ 1.83 8895. 28.92 29.82 38.92 38.22 28.83 31.87 29.92 31..1 28.6 3.8 1.89 8896. 29.47 31.1~ 3'1.51 31.$~ 28.73 31.~3 3~.56 31.8 28.7 3.1 1.83 8897. 28.92 38.~B 38.59 32.35 29.32 38.33 38.17 32.4 28.9 3.4 2.19 8898. 28.88 3~.37 29.56 31.54 29.46 31.87 29.96 31.5 28.8 3.5 1.96 8899. 27.52 28.49 38.48 3~.7~ 29.61 31.32 29.68 31.3 27.5 3.8 2.88 PAGE 4 ARCO ALASKA INC. D.S.,9-I8 DEPTH SIGMA SIGMA SIGMA SIGHA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 8989. 28.48 25.48 29.96 29.85 38.28 32.12 29.68 32.8 25.4 6.6 4.19 8981. 26.64 25.96 29.71 29.45 28.69 32.76 29.87 32.8 26.8 6.8 3.69 8982. 25.87 26.88 28.86 28.82 29,98 3],54 28.76 31.5 25.9 5.7 2.98 ~983. 27.93 29.38 29.68 29.74 38.68 33.81 29.87 33.8 27.9 5.1 3.15 8984. 26.79 27.68 28.82 31.18 29.98 38.48 29.88 31.2 26.8 4.4 2.29 89~5 26.68 27.79 27.18 38.74 28.62 31.88 28.81 31.8 26.7 5.1 2.99 8986 28.48 27.98 27.28 38.66 28.73 31.87 29.87 31.1 27.3 3.8 1.99 8987. 29.99 27.76 29.38 38.77 28.88 38.81 29.68 38.8 27.8 3.1 1.92 8988. 28.88 26.99 38.22 38.37 29.28 33.85 29.75 33.1 27.~ 6.1 3.38 8989. 27.78 26.88 31.87 29.12 29.58 31.21 29.31 31.2 26.9 4.3 2.43 8918. 29.18 28.75 31.66 29.12 27.66 33.46 29.43 33.5 27.7 5.8 4.82 8911 38.32 28.85 38.29 29.88 38.27 38.74 29.88 38.7 28.1 2.7 1.75 8912, 38.24 28.79 31.32 38.22 38.49 32.~6 38.42 32,1 28.8 3.3 1.64 8913. 38.58 29.89 29.71 31.65 38.57 38.51 38.51 31.7 29.7 1.9 1.15 8914. 29.62 29.88 29.56 29.89 31.84 38.~8 29.78 31.9 29.1 2.8 1.26 8915. 29.18 28.31 38.85 31.54 39.98 29.23 3~.84 31.5 28.3 3.2 1.73 8916. 28.29 29.93 29.74 31.43 38.53 28.71 29.83 31.4 28.3 3.1 1.68 8917. 26.93 29.~4 27.43 31.96 29.98 3~.59 29.~3 31.8 26.9 4.8 2.~9 8918. 26.24 28.75 26.25 28.57 27.74 32.39 28.15 32.4 26.2 6.2 4.24 8919. 27.26 3,8.55 26.99 3~.33 29.98 31.29 29.21 31.3 27.8 4.3 2.22 8928. 27.56 31.83 27.46 29.19 38.93 39.51 29.25 31.9 27.5 3.6 1.78 8921. 26.57 3~.49 27.32 28.57 39.81 31.16 28.75 38.4 26.6 3.8 2.18 8922. 29.21 28.89 28.42 3~.88 27.63 24.34 28.25 38.9 24.3 6.5 3.92 8923. 28.74 29.67 29.45 31.18 29.39 27.65 29.41 31.2 27.6 3.5 1.76 8924. 29.51 29.74 29.68 3~.77 28.32 29.34 29.55 38.8 28.3 2.4 1.22 8925. 28.85 29.63 29.76 3~.92 31.63 29.81 29.92 31.6 28.8 2.8 1.71 8926. 3~.57 29.78 29.38 3~.tl 3~.57 3~.74 31.27 38.8 29.4 1.4 9.89 8927. 29.84 38.68 29.38 29.71 29.61 31.95 3~.19 31.9 29.4 2.6 1.76 8928. 28.99 38.66 29.38 27.35 38.27 38.29 29.64 38.9 27.4 3.5 2.29 8929. 28.37 31.99 28.66 29.49 31.63 27.98 29.89 32.8 28.8 4.8 2.89 8938. 39.46 38.59 28.86 38.29 38.99 3~.44 38.~7 38.6 28.9 1.7 1.21 8931. 31.38 29.91 29.23 38.11 31.26 39.88 38.25 31.4 29.0 2.4 1.24 8932. 38.68 29.69 27.57 28.2~ 38.68 3~.88 29.49 38.9 27.6 3.3 1.92 8933. 38.79 26.38 28.86 29.93 28.21 31.7~ 29.58 38.8 28.2 2.6 1.29 8934. 38.68 26.65 28.91 29.67 28.84 31.43 29.25 31.4 26.7 4.8 2.68 8935. 28.78 25.61 27.86 28.99 25.68 29.23 27.45 29.2 25.7 3.6 1.78 8936. 26.27 25.55 25.29 25.77 23.84 26.91 25.66 26.9 23.8 3.1 1.82 6937. 25.13 23.~5 23.57 22.32 21.81 22.96 23.J1 25.1 21.8 4.1 2.12 8938. 23.33 21.36 22.16 21.8~ 22.15 22.24 22.18 23.3 21.4 2.9 1.23 8939. 22.45 22.46 21.65 23.27 23.87 23.53 22.76 23.5 21.7 1.9 1.11 8948. 22.71 24.84 22.57 24.45 22.66 23.97 23.35 24.4 22.6 1.9 1.18 8941. 25.46 23.71 21.18 23.46 21.68 23.68 23.22 25.1 21.2 3.9 2.85 8942. 23.55 22.~2 19.63 21.88 28.38 22.46 21.73 23.6 19.6 3.9 2.18 8943. 22.48 28.15 21.87 21.54 28,97 22.28 21.31 22.3 2~.1 2.1 1.16 8944. 22.48 28.29 28.85 21.91 19.83 2f.99 2ff.96 22.1 19.8 2.3, 1.13 8945. 2~.54 21.51 2~.81 19.41 I8~84 19.78 19.97 28.8 18.8 2.8 1.14 8946. 19.88 19.41 2f.29 2~.ffl 19.65 18.9~ 19.71 28.3 18.9 1.4 8.81 8947. 19.76 2~.18 21.25 21.~7 21.3~ 18.57 2~.51 21.3 18.6 2.7 1.94 6948. 21.35 28.66 2'2.43 21.36 29.68 16.86 29.67 22.4 18.9 3.6 1.81 1949. 22.91 24.18 ~1.04 21.29 2~.79 19,62 21.41 22.8 19.5 2.5 1.49 PAGE 5 ARCO ALASKA INC. D.S,9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS I PASS Z PASS 3 PASS 4 PASS 5 PASS 7 AVG. 895B. 2B.43 2B.66 22.1B 22.13 24.~6 21.91 22.BB 24.1 2~.4 3.6 2.~6 8951. 22.38 24.38 25.44 24.23 27.51 26.62 24.94 27.5 22.4 5.1 2.57 8952. 26.31 28.49 29.19 29.~4 26.67 29.67 28.~8 29.7 26.3 3.4 1.77 8953. 28.85 Z8.71 3g.~7 29.85 28.~3 29.71 29~28 3~.1 28.~ 2.~ 1.25 8954, 3~,94 28.9~ 38.11 29,41 28,87 28.93 29,46 38,9 28.1 2.9 1,48 8955. 38.17 29.6~ 29.19 28.82 28.91 27.24 29.~5 3~.2 27.2 2.9 1.81 8956. 38.1~ 28.28 28.42 28.68 29.13 26.47 28.51 38.1 26.5 3~6 2.94 8957. 29.69 27.87 28.79 38.11 27.99 28.24 28.81 3~.I 27.9 2.2 1.39 8958. 29.88 28.64 29.~1 29.68 27.81 28.75 28.88 29.8 27.8 2.8 1.87 8959. 38.39 28.13 29.23 28.46 29.54 3~.96 29.42 31.8 28.1 2.8 1.53 8969. 3~.46 27.28 28.6~ 28.68 38.12 3~.~7 29.34 3,8.5 27.3 3.2 2.~6 8961. , 29.88 27.54 28.46 29.19 38.89 3~.55 29.27 38.6 27.5 3.8 1.74 8962. 28.77 28.24 28.6~ 29.41 28.69 38.81 28.92 38.8 28.2 2.6 1.89 9963. 28.44 29.34 38.gg 29.45 29.86 29.15 29.25 38.8 28.4 1.6 ~.81 8964. 27.82 28.13 29.67 3~.22 28.14 3~.~4 29.~2 39.2 27.8 2.4 1.29 8965. 28.59 28.93 3W.W4 28.86 28.18 32.17 29.21 32.2 28.2 4.8 2.96 8966. 27.96 29.71 29.93 29.23 27.29 31.18 29.24 31.2 27.3 3.9 1.94 8967. 29.14 28,86 29,89 28.64 27.81 3~.99 29.28 31,8 27.8 3.Z 1.79 8968. 3J.57 28.38 29.82 28.68 28.88 3f.99 29.62 31,8 28.4 2,6 1.37 8969. 29.21 28.53 28.6~ 29.i9 26.74 31.32 28.9~ 31.3 26.7 4.6 2.43 8978. 29.58 28.t6 29.93 28.42 27.87 29.74 28.95 29.9 27.1 2.9 1.88 8971. 28.26 26.18 29.34 28.31 27.85 29.45 28.28 29.4 26.2 3.3 2.11 8972. 28.~4 28.97 29.6~ 31.~3 29.28 29.26 29.28 31.8 28.8 3.8 1.75 8973. 29.29 27.87 27.94 28.66 29.72 29.3~ 28.62 29.7 27.9 1.9 1.18 6974. 28.63 28.~1 27.46 29.12 27.92 38.15 28.52 3~.1 27.5 2.7 1.63 8975. 26.92 27.24 25.77 27,18 26.71 29,52 26.97 29.5 25,8 3.8 2,55 8976. 26.57 24,82 24.56 25,74 24,6] 27.63 25,59 27.8 24.6 3.3 2.24 6977. 24.~3 24.26 2~.19 23.96 24.86 25.~7 24.15 25.1 23.9 1.2 9.93 6978. 23.33 24.78 24.67 23.31 23.83 24.98 23.9~ 24.8 23.g 1.8 g.88 6979. 24.43 24.38 25.97 23.96 25.89 24.23 24.47 25.1 23.9 1.2 8.62 8988. 25.17 23.~5 23.62 23.91 23.83 24.89 23.96 25.2 23.8 2.2 1.21 8981. 23.85 2].73 2~.74 21.49 19.99 22.28 21.56 23.8 19.9 3.9 2.28 8982. 28.94 18.I3 18.13 19.71 17.62 19.52 18.92 28.9 17.6 3.3 2.~3 8983. 18.66 17.65 18.13 19.41 18.14 19.63 18.64 19.6 17.6 2.g 8.99 8984. 19.14 19.63 19.41 28.18 19.13 2~.63 19.66 28.6 19.1 1.5 8.97 6985. 28.83 2~.99 19.66 2~.79 19.54 28.92 28.27 21.~ 19.5 1.5 8.73 8986. 21.46 19.71 19.96 2~.~4 19.58 2~.22 2~.~ 21.5 19.:5 2.8 1.46 8987. 19.58 18.98 18.57 19.12 18.Z1 19.82 19.~1 19.8 18.2 1.6 8.8~ 8988. 19.62 18.93 19.34 19.49 19.98 ~.~ 19.31 19.9 18,9 1.~ 8.68 8989. 19.73 19.68 19.52 2~.92 28.79 ~.J~ 19.66 2~.9 19.5 1.4 1.26 8998. 19.8~ 19.J4 18.2J 19.82 19.46 -~.~8 19.15 19.8 18.2 1.6 ~.95 8991. 19.48 16.43 16.53 19.41 17.961'5~4.J6 18.96 19.4 16.4 3.8 2.53 8992. 17.3~ 17.98 19.15 19.12 18.58 -~.~ 18.25 19.2 17.3 1.9 8.95 8993. 17.96 17.83 ZS.~B 17.98 19.18 -~.BB 18.46 2~.8 17.8 2.2 1.54 6994. 18.~7 16.95 19.19 18.75 17.92~g98.~ 18.56 19.2 16.9 2.2 1.6'1 6995, 17.74 17.79 18.82 19.12* 19.433124.13 18.97 19,4 17.7 1.7 1.23 8996. 19.18 18.53 18.24 19.45 28.13 -~.~ 18.92 2~.1 18.2 1.9 1.28 8997. 19.76 18.~9 18.97 17.94 18.32 -~.~ 18.46 19.8 17.9 1.8 1.31 6998. 18.44 17.76 17.57 18.53 18.47 ~.~ 18.~2 18.5 17.5 1.~ 8.51 8999. 18.63 17.46 17.39 18.75 ]8.2151~.~ 18.13 18.8 17.4 1.4 ~.72 PAGE 6 ARCO ALASKA INC. D.S~9-1'8 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGHA NLHI NLLO MILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 9888, 19,14 17,54 18,27 28,59 19.616292.89 19.43 28,6 17,5 3.1 1,89 9881. 28.83 28.15 28.99 22.54 21.78 -8.88 28.98 22.5 28.1 2.4 1.56 9882. 21,68 21,18 22,18 23,31 22.63 8,88 21,85 23,3 21,t 2,2 1,46 9883. 23.84 21.25 21.99 23.64 22.15 8.88 22.87 23.6 21.2 2.4 1.57 9884. 22.26 23.53 24.41 25.74 25.75 8.88 23.97 25.7 22.3 3.5 1.78 9885. 24.91 27.65 27.87 28.38 27.858272.88 27.94 28.4 24.9 3.5 3.83 9886, 28.15 28,82 29,38 28.85 28.14 8,88 28,14 29,3 28.1 1,3 1.16 9887, .28,55 27,24 29.38 26.21 26,34 -8.88 27,38 29.3 26.2 3.1 1.92 9888. 26.86 26.18 28.57 25.88 25.53 8.88 25.85 28.6 25.8 3.6 2.71 9889. 25.87 24.12 25.77 24.81 25.16 8.88 24.91 25.9 24.8 1.9 8.95 9818. 24.21 23.13 22.94 21.65 21.78 -8.88 22.42 24.2 21.7 2.6 1.79 9811, 22,15 21,32 28,33 19,15 28.139254,67 21,14 22,2 19.2 3,8 1,99 9812, 28,32 19,52 19,15 18,13 17,961138,38 18,78 28.3 18,B 2,4 1,53 9813, 19,83 18,89 17,86 16,84 15,798142,75 17,93 19,8 15,8 3,2 2.15 9814, 17,71 17,58 15,55 16,21 15,68 8.88 15,94 17,7 15,6 2,2 1,76 9815. 17,67 15,88 14,52 15.96 17.844115,28 15,94 17.7 14,5 3,1 1.73 9816, 16,42 15,59 15,87 16,48 16.63 8,88 15,75 16,6 15,1 1,6 8,89 9817. 17.19 16.18 15.44 16.88 15.714432.88 16.49 17.2 15.4 1.8 1.85 9818, 16,57 16.18 14,63 16,51 I5.828888,88 16,34 16,6 14.6 1.9 1,71 9819, 16,28 15,77 15.33 16,58 16.19 -8,88 15,97 16.6 15.3 1,3 8,64 9828, 15,46 16,48 15,96 16,99 16.88 8,88 15,94 17,~ 15.5 1,5 1,84 9821, 16,28 16,18 16,47 1'7,21 16.15 -8,88 16.31 17,2 16.2 1,1 8.89 9822, 16,13 17,24 16,21 16,43 15.64 ~,88 16,88 17,2 15.6 1,6 1,16 9823, 15,28 16.65 16,32 15,77 15,57 8,88 15,67 16,7 15,3 1,4 B,99 9824, 15,79 15,81 17,21 17,86 15.428568,82 16.24 17.2 15,4 1,8 8,97 9825, 16,68 15,88 17,~2 16,18 15.988888,88 16,46 17,8 15.9 1.1 8.58 9826, 18,18 15,22 17,61 15,77 15.53 -8,88 16,42 18,2 15.2 3.8 1.77 9827, 17,71 15.I1 17,39 16,18 15.49 -8,88 16,25 17,7 15,1 ~.6 1.46 9828, 16.,71 14,41 16,18 15,81 15.495888.88 15,61 16,7 14,4 2,3 1,19 9829, 15,98 15,37 16,83 15,96 16.38 -8,88 15.92 16,3 15,4 8.9 8,55 9838, 15,79 14,89 15,15 15,4~ 15.688125.88 15,54 15.8 14.9 8.9 8.65 9831, 16,24 14,93 15,85 15,78 16.781258.88 16,24 16.8 14.9 1,9 1.31 9832, 15,17 15,15 16,83 15,59 16.71888~,88 15,59 16.7 15,1 1,6 1,12 9833, 15,21 15,33 15,59 15,96 16.38 -8,88 15,58 16.3 15,2 1,1 8.72 9834, 15,46 14,67 15,48 15,55 16.125883,88 15,66 16.1 14.7 1,4 8,99 9835; 15,43 14,71 15,84 14,71 15.315848,58 15,81 15,4 14,7 8,7 8.42 9836. 15.18 14.63 14.63 15.51 14.65 8.88 14.64 15.5 14.6 8.9 8.87 9837, 15,61 14,41 14.63 15,66 14.985848,58 15,81 15,7 14.4 1,3 8,65 9838. 14.88 14.49 14.34 14.78 15.42 8.88 14.57 15.4 14.3 1.1 8.85 9839. 14.43 14.19 14.34 14.63 15.49 -8.88 14.42 15.5 14.2 1.3 1.87 9848. 14.91 14.63 15.78 14.74 15.892658.81 15.19 15.7 14.6 1.1 8.56 9841. 15.46 15.77 15.87 15.11 14.5~3524.35 15.42 15.8 14.5 1.3 8.92 9842, 16,28 16.87 16,99 16.36 16.345371,78 16.56 17,8 16.1 8,9 8.49 9843, 16,75 16,88 17,57 17,87 17,44 -8,88 17,17 17.9 16.8 1.1 8.69 9844, 17,93 17,18 17,87 18,13 17,555541,99 17,98 18,1 17,1 1,8 8,88 9845. 18,55 17.79 18,42 19,89 I9,13 -8,88 18,52 19,9 17,8 2,1 1.37 9846, 19,91 18,97 17,98 18,75 18,848888,88 18,82 19,9 18,8 1,9 1.18 9847, 18,78 18,24 16,84 17,35 17,~7 -8,88 17,54 18,7 16,8 1,9 1,16 9848, 17,63 17,61 16,48 17,65 17,55 8,88 17.82 17,6 16.4 1,3 8,63 9849. 17.12 16.14 16.95 18.46 17.~4 8.8~ 16.79 18.5 16.1 2.3 1.67 PAGE 7 ARCO ALAS. KA lINC, D.S,9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 9850. 17.26 16.69 18.24 18.24 9~51. 18.33 17.98 17.46 18.68 9~52. 18,44 18.27 17.58 18.86 9~53. 18.11 17.61 17.82 18.31 9~54. 17.49 17.39 17.87 17.79 9~55. 18.37 16.69 17.94 17.94 9~56. 19.43 17.~2 17.28 18.79 9~57, 19.18 18.-71 16.99 19.41 9858. 19.84 19.12 18.35 28.18 9~59. 19.69 18.27 1B.~l 18.93 9~6~. 19.43 18.13 18.42 18.75 9861. 18.66 18.79 18.49 18.89 9~62. 18.44 19.15 18.79 18.38 9~63. 18.55 18.49 16.64 16.75 9~64. 17.78 17.43 17.58 2~.88 9~65, 17.6~ 17.21 17.32 18.82 9866. 16.13 17.1~ 15.59 17.24 9~67. 16.16 16.43 16.91 18.89 9~68. 16.~5 16.99 18.75 18.64 9~69. 17.93 17.98 I8.75 28.87 9~7~. 18.63 19.~4 17.94 19.45 9871. 18.66 19.67 17.61 17.39 9~72. 18.~4 19.49 17;82 17.35 9~73. 17.85 18.24 16.99 16.62 9874. 18.15 17.87 18.16 17.57 9875. 17.52 17.32 17.39 17.28 9876. 17.26 16.69 16.95 19.~8 9877. 18.51 16,73 17.54 I9.23 9~78. 18.11 17.35 18.24 19.19 9~79. 17.26 16.88 18.79 19.15 9g89. 18.44 16.43 17.68 19.34 9~81. 19.1~ 16.69 18.86 18.57 9982. 18.99 16.95 19.45 18.85 9883. 18.74 17.98 19.84 18.71 9~84. 18.48 16.95 2~.15 I8.68 9~85. 18.59 17.17 17.57 17.94 9~86. 17.74 17.18 17.17 18.68 9~87. 18.~B 16.47 17.lB 18.57 9~88. 18.77 18.~5 17.24 17.98 9889. 18.74 18.13 18.71 19.26 9~9~. 19.83 17.21 18.64 18.97 9~91. 18.48 18.28 17.87 16.76 9B92. 17.52 18.68 17,54 17.24 9~93. 16.97 17.83 17.35 17.82 9~94. 17.74 17.72 16.99 16.54 9895. 17.38 16.18 16.32 16.54 9896. 17.56 17,24 16.76 16.47 9~97. 18.96 17.79 17.46 16.76 9~98. 18.37 17.58 18.&~ 17.68 9899. 17.63 17.54 18.79 17.21 18.97 18,57 17.83 18.6 16.7 1.9 1.14 18.76 17.94 18.15 18.8 17.5 1.3 ~.69 17.44 18.81 18.14 18.9 17.4 1.4 ~.72 17.11 19.82 17.86 19.8 17.B 2.8 1.96 17.4~ 18.57 17.64 18.6 17.4 1.2 ~.93 17.59 19,26 17.96 19.3 16.7 2,6 1.31 17.59 20.81 18.36 2~,8 17.~ 3.8 2.45 16.96 20.22 18.6~, 2~,2 17.~ 3.3 1.63 17.62 19.74 19.10 2~.2 17.6 2.6 1.48 17.85 18.71 18.49 19.7 17.8 1.8 1.20 18.8~ 17,76 18.58 19,4 17,8 1.7 ~,85 18.62 18.~1 18.42 18.8 18.B 8.8 ~,4~ 17.55 17.54 18.35 19.2 17.5 1.6 8.81 17.44 17.35 17.95 18.8 16.8 1.9 1.11 18.18 17.~2 17.79 ZB.B 17.B 3.8 2.21 17.7~ 16.88 17.46 18.8 16.9 1.9 1.37 16.12 17.87 16.68 17.9 15.6 2.3 1.19 16.34 18.31 17.17 18.3 16.2 2.1 1.14 17.59 19.12 17.87 19.1 16.1 3.1 1.82 19.59 16.76 18.42 Zg.1 16.8 3.3 1.65 18.8~ 16.~7 18.56 19.4 16.1 3.4 2.49 18.54 16.62 18.88 19.7 16.6 3.1 1.59 18.73 16,29 17.88 19.5 16.3 3.2 1.61 18.51 17.98 17.68 18.5 16.6 1.9 1.86 17.22 17.46 17.72 18.2 17.2 B.9 ~.5~ 16.71 18.57 17.4~ 18.6 16.7 1.9 1.17 17.18 19.6~ 17.95 19.6 16.7 2.9 1.65 17.18 19.63 18.18 19.6 16.7 2.9 1.45 17.66 19.38 18.32 19.4 17.4 2.~ 1.86 18.25 19.~4 18.18 19.2 16.9 2.3 1.31 18.25 18.86 18.27 19.3 16.4 2.9 1.84 19.I~ 18.79 18.82 19.1 16.7 . 2.4 2.13 18.91 19.63 18.8~ 19.6 16.9 2.7 1.85 18.25 18.97 18.63 19.~ 18.~ 1.1 ~.65 18.1~ 19.23 18.58 2~.1 16.9 3.2 1.63 18,32 18.31 17.95 18.6 17.2 1.4 B.78 17.11 17.87 17,49 18.7 17.1 1.6 1.19 17 29 19.84 17.76 19.~ 16.5 2.6 1.29 18.51 18.68 18.28 18.8 17.2 1.5 1.~4 18.21 17.87 18.46 19.3 17.9 1.4 19.32 18.38 18.71 19.3 17.2 Z.1 1.5~ 18.76 16.88 17.79 18.8 16.8 Z.~ 1.~3 16.85 16.~7 17.37 18.7 16.1 2.6 1.31 16.85 16.36 17.86 17.8 16.4 1.5 ~.77 16.71 17.18 17.14 17.7 16.5 1.2 ~.6~ 16.38 17.68 16.79 17.7 16.1 1.6 ~.89 17.66 17.83 17.23 17.8 16.5 1.4 ~.76 18.B7 18.8,6 17.93 I9.B 16.8 2,2 1.17 18.21 17.46 17.96 18.6 17.5 1.1 8.65 18.73 17.76 17.98 18.8 17.2 1.6 8.81 PAGE 8 ARCO ALASKA INC. D.S~.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 9188. 18.15 16.65 18.71 18.27 18.69 18.27 18.27 18.7 16.7 2.1 1.62 9181, 18.51 16.87 18.35 18,46 16.89 18.86 17,79 18,9 16,1 2.8 1,72 9182, 16,97 16,91 17.58 18.82 17.99 19.81 17,98 19,8 16.9 2,1 1.11 9183. 16.27 16.65 17.39 17.76 18.32 17.58 17.34 18.3 16.3 2.1 1.87 9184. .16.68 16.76 16.43 17.98 16.85 18.16 17.25 18.2 16.4 1.7 8.91 9185. 17.84 17.32 16.36 18.81 16.45 18.31 17.23 18.3 16.4 1.9 1.88 9186, 17,45 17,58 16,21 18,46 17,26 19,23 17,61 19.2 16,2- 3.8 1,62 9187. 19.18 16.84 16.32 17.94 17.96 19.12 17.95 19.1 16.3 2.8 1.63 9188. 28.21 15.81 17.17 18.82 17.15 28.87 18.81 28.2 15.8 4.4 2.28 9189. 28.68 15.55 17.76 19.85 17.55 19.63 18.69 28.7 15.6 5.1 3.14 9118. 21.75 17.83 19.67 28.29 28.81 28.77 28.15 21.7 17.8 3.9 2.32 9111, 28,87 19,56 28.11 28,74 28,53 28.59 28,46 28,9 19.6 1,3 8,98 9112, 28,98 19,96 28,63 28,15 19,32 21,25 28.39 21,2 19.3 1,9 1,87 9113, 19,91 28,59 21,54 19,89 19,65 28,99 28.44 21,5 19,6 1,9 1.18 9114, 28,83 28,15 21.29 19,89 19.86 28,63 28,36 21,3 19.1 2,2 1.38 9115, 21,68 18,93 28,99 28,74 28,75 21,69 28,87 21,7 18.9 2,8 1,94 9116, 28,58 19,38 21,73 21,25 22,87 21,88 21,28 22,1 19.3 2,6 1,98 9117, 28,54. 19,71 21,98 22,54 21,26 28,29 21,85 22,5 19.7 2,8 1,49 9118, 23,26 28,66 19,71 21,58 19,I7 28,74 28.78 23,3 19.2 4,1 2.56 9119, 25,35 19,78 28,63 28,78 19.98 24,82 22,35 25,4 19,8 5,6 3,81 9128, 25.86 28,33 23.75 23,82 23,95 27,86 23.89 27,1 28.3 6,7 3.56 9121, 23,74 23,31 24,23 26,73 24.98 25,22 24,57 26,7 23.3 3,4 .2.16 9122. 28.28 26.83 22.43 24.68 23.87 22.94 23.41 26.8 28.3 5.8 3.13 9123, 17,56 24,38 28,59 28,51 21.82 19,82 28,78 24,3 17,6 6,7 3,68 9124, 16,49 21,87 19,67 19,23 19,32 16,65 18,82 21,1 16,5 4,6 2,33 9125, 17,45 19,12 18.46 17,83 16.68 16,95 17,78 19,1 16,6 2,5 1,42 9126, 17,85 18,13 17,54 18,53 16.85 16,69 17,61 18.5 16.7 1,8 8.92 9127, 17,78 16,84 18.68 19,81 17.87 17.54 17,81 19.8 16,8 2.2 1,28 9128. 15.83 16.65 18.49 18.49 18.29 17.68 17.57 18.5 15.8 2.7 1.74 9129, 15.57 17,82 17,57 18.13 16,85 18.38 17,38 18,4 15,6 2,8 1.72 9138, 16,38 15,99 17,83 17,68 17.29 19.84 17,49 19,8 16.8 3,1 1.56 9131. 17,56 17,46 18,42 17,79 18.32 19,38 18.86 19.3 17.5 1.8 1.24 9132. 17.45 17.76 17.72 17.68 18.62 18.49 18.88 18.6 17.4 1.2 8.62 9133, 18.11 17,58 18,89 18.86 17.74 19,15 18,24 19,2 17.5 1,7 8.92 9134, 18,55 17,58 18,98 19,71 19.13 19.34 18,94 19,7 17.5 2,2 1.44 9135, 18.92 18.35 19,68 28,84 28.86 .19.19 19.48 28,9 18.3 2,5 1.38 9136, 28,98 17.94 19,82 28,99 21,15 28,59 28.44 21.2 17.9 3,2 2.58 9137, 19,69 18,53 28,88 28,48 21,56 21,21 28,24 21.6 18.5 3,8 1.71 9138, 28,54 28,18 28,33 19,71 28.24 21,18 28,35 21,2 19.7 1,5 8.83 9139, 18,96 28,99 19,68 18,71 19.46 19,93 19,53 21,8 18.7 2,3 1.46 9148, 17,96 18,85 19.19 18,86 18.62 19,68 18,74 19,6 18,8 1,6 8.86 9141, 17,67 19,41 19,38 19,38 19.39 19,93 19,37 19,9 17,7 2.3 1.78 9142, 28,82 28,11 28,48 28.96 19.98 21.18 28.46 21,2 19.9 1,3 8,72 9143, 23,92 21,43 2~,77 23.28 28.93 23.71 22,32 23,9 28.8 3.1 1.68 9144. 25.98 24.B1 22.72 25.22 23.43 27.35 24.71 27.4 22.7 4.6 2.65 9145. 27.88 28.68 27.57 28.53 25.97 29.19 27.88 29.2 26.8 3.2 1.91 9146. 25.21 29.71 29.52 28.82 27.29 31.18 28.66 31.1 25.2 5.9 3.46 9147. 24.88 28.75 29.93 28.93 26.56 29.89 28.23 29.9 24.9 5.1 3.43 9148. 27.82 28.82 29.89 27.57 26.916 28.93 28.32 29.9 27.~ 2.9 1.57 9149. 27.74 28.82 29.81 26.88 27.18 29.38 28.18 29.4 26.8 2.6 1.29 PAGE 9 ARCO ALASKA INC. D.S.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 9158. 27.84 29.78 29.49 26.65 28.8~ 29.88 28.34 29.8 26.7 3.1 1.68 9151. 28.96 29.96 28.82 28.27 29.43 28.49 28.96 38.8 28.3 1.7 1.81 9152. 28.99 28.35 28.68 28.79 29.43 28.46 28.72 29.4 28.3 1.1 8.78 9153. 28.66 28.13 28.49 26.76 28.18 38.~7 28.39 38.1 26.8 3.3 1.68 9154. 28.44 29.~ 27.98 26.~7 28.95 29.89 28.69 29.9' 26.1 3.8 2.63 9155. 27.93 29.38 29.15 26.62 27.81 38.77 28.59 38.8 26.6 4.2 2.18 9156. 28.87 26.14 28.81 27.13 27.74 25.74 27.89 28.1 25.7 2.3 1.36 9157. 25.39 25.18 25.59 25.48 26.85 2.4.84 25.43 26.9 24.8 2.8 1.42 9158. 26.71 25.48 25.88' 24.12 26.88 24.12 25.42 26.7 24.1 2.6 1.38 9159, 27.49 24.89 26.83 24,68 26.49 25,55 25,79 27,5 24.6 2.9 1.69 9168, 28.99 25.33 26.,88 26,58 27.85 29,38 27,36 29.3 25.3 4,Z Z.83 9161. 27.52 25.15 28.57 27.57 27.48 38.37 27.67 38.4 25.1 5.2 2.7~ 9162. 27,45 26.51 27.98 27.17 29.21 38.18 28.85 38.2 26.5 3.7 2.14 9163. 26.16 26.91 27.86 27.32 28.69 29.41 27.61 29.4 26.2 3.3 1.81 9164. 25.94 27.72 26.47 26.4~ 28.~3 38.51 27.21 38.5 25.9 4.6 3.38 9165. 26.89 27.24 27.61 27.39 29.1~ 29.71 27.75 29.7 26.1 3.6 1.95 9166. 25.43 25.99 28.9~ 27.18 28.18 28.27 27.16 28.9 25.4 3.5 1.74 9167. 22.85 24.12 28.27 25.15 27.87 26.47 25.68 28.3 22.9 5.4 2.74 9168. 21.64 24.15 26.~3 23.64 24.54 24.26 24.12 26.8 21.6 4.4 2.48 9169. 21.27 23.82 23.81 21.32 22.92 23.~9 22.56 23.8 21.3 2.6 1.29 9178. 19.95 22.54 21.95 28.74 21.78 21.32 21.34 22.5 19.9 2.6 1.39 9171. 18.51 21.51 28.74 2~.88 28.68 19.3~ 28.25 21.5 18.5 3.8 1.73 9172. 18.26 19.88 19.26 19.41 19.18 18.86 19.87 19.4 18.3 1.2 8.81 9173. 17.52 18.42 17.58 17.57 18.32 19.41 17.97 19.4 17.5 1.9 1.44 9174. 18.26 18.79 16.84 18.~9 18.87 18.13 18.11 18.8 16.8 1.9 1.27 9175. 19.99 18.27 17.68 19.67 17.59 19.26 18.77 28.8 17.6 2.4 1.22 9176. 23.11 18.79 19.23 2~.81 19.17 21.87 2~.12 23.1 18.8 4.3 2.99 9177. 27.78 21.29 21.99 23.24 21.41 26.~7 23.71 27.8 21.3 6.5 4.87 9178. 28.44 27.~8 26.69 28.13 24.83 28.86 27.56 28.9 24.8 4.8 2.73 9179. 27.71 27.88 28.53 28.42 27.7~ 29.89 28.11 29.9 27.8 2.9 1.78 9188, 25,98 27,88 28,24 28.71 25.27 28,13 27,87 28.7 25,3 3,4 1.89 9181. 23.77 29.93 25.59 26.29 24.28 24.49 25.28 29.9 23.8 6.2 4.64 9182. 21.24 22.61 24.23 23.13 23.43 22.98 23.82 24.2 21.2 3.~ 1.79 9183. 28.98 21.18 22.87 28.74 22.26 22.24 21.71 22.9 28.7 2.1 1.16 9184. 28.58 28.48 28.77 19.93 21.82 22.43 21.~i 22.4 19.9 2.5 1,42 9185. 18.66 19.23 19.68 28.~4 21.19 28.87 19.82 21.2 18.7 2.5 1.37 9186. 19.69 19,23 28.78 28.29 28.46 21.18 28.24 21.1 19.2 1.9 1.82 9187. 28.32 19.15 21.18 21.13 19.79 28.63 28.41 21.1 19.2 1.9 ].26 9188. 28.98 21.87 21.69 21.32 28.53 28.74 21.13 21.7 28.5 1.2 8.66 9189. 23.48 21,87 28,96 22.35 21,38 22.24 21.77 23.4 21.8 2.4 1.63 9198. 27.78 28.16 23,27 24.63 22.63 25,92 25.39 28.2 22.6 5.5 2.77 9191. 26.57 27.82 28.35 27.58 25.46 29.84 27.26 29.8 25.5 3.6 1.81 9192. 26.93 27.79 26.62 27.68 28.87 28.89 27.51 28.1 26.6 1.5 8.89 9193. 28.87 29.81 25.99 27.72 28.62 29.23 28.35 29.2 26.8 3.2 2.35 9194. 76,.68 28.57 28.13 27.43 26.26 38.26 27.78 3~.3 26.3 4.8 2.48 9195. 2~.15 27.87 26.54 27.35 26.23 27.18 27.87 27.9 26.2 1.6 8.84 9196. 27.56 28.75 25.22 26.21 26.38 27.39 26.8-9 28.8 25.2 3.5 1.86 9197. 28.59 27.83 27.83 28.13 27.11 29.71 28.17 29.7 27.1 2.6 1.54 9198. 3~.43 28.68 28.97 29.6~ 3~.24 3B.4B 29.69 38.4 28.7 1.8 1.81 9199. 29.25 29,26 29.56 31.1~ 3~.49 31.76 39.18 31.8 29.3 2.5 1.58 PAOE 1~ ARCO ALAS~,A INC. D.s.g-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO MILO DIFL FT. PASS I PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. g2gg. 2.9.65 27.92 38.15 31.14 29.94 3i.54 38.84 31.5 27.8 4.5 3.82 9281 ' 29.32 27.61 29.56 3~.94 29.79 28.57 29.24 38.8 27.6 2.4 1.63 9282. 27.74 28.38 29.82 28.82 28.21 29.71 28.78 29.8 27.7 2.1 1.84 9283. 24.51 25.63 27.24 25.77 26.56 25.77 25.82 27.2 24.5 2.7 1.42 9284. 21.86 22.43 25.11 25.29 25.42 23.68 23.86 25.4 21.9 ~3.6 2.88 9285. 21.31 19.63 22.98 21.47 22.15 28.22 21.31 23.8 19.6 3.3 1.67 9286. 28.18 25.63 28.18 28.11 28.68 19.67 28.28 25.6 19.7 6.8 5.34 9287. 19.43 22.43 19.45 19.85 28.28 lg.15 Ig.82 22.4 19.2 3.3 2.61 9288. lg.lg 19.63 18.75 19.23 28.53 19.~1 19.27 28.5 18.8 1.8 1.26 9289. 19.91 19.34 19.98 18.98 19.58 19.93 19.42 19.9 18.9 1.8 8.52 92~. 28.39 28.22 2~.84 19.63 28.57 20.59 28.30 2£.6 19.6 1.8 ~.67 . . 9211. lg. Z9 19.~8 28.63 2~.4~ 2~.68 28.18 19.97 28.7 19.1 1.6 8.89 9212. 19.62 19.74 2~.33 2~.66 28.81 19.41 19.97 28.7 19.4 1.3 8.69 9213. 28.57 2~.88 18.35 28.77 28.24 2~.18 2J.48 2~.9 18.3 2.5 2.66 9214. Z~.39 26.15 19.96 21.64 22.64 22.28 21.~9 22.3 28.8 2.3 1.19 9215. 19.~7 2~.11 22.32 19.12 21.49 2~.29 28.38 22.3 19.1 3.3 2.82 9216. '19.36 22.13 19.74 18.46 28.16 2~.11 19.93 22.1 18.5 3.7 2.21 9217. 2~.46 22.~6 2~.22 19.89 19.21 21.~7 2~.47 22.1 19.2 2.9 1.59 9218. 23.~8 28.37 28.55 21.18 19.57 21.~7 28.81 23.8 19.6 3.4 2.19 9219. 23.15 28.29 24.~4 22.18 28.93 23.27 22.17 24.8 28.3 3.8 1.88 9226. 23.15 21.73 25 63 22.61 23.67 23.35 '23.11 25.6 21.7 3.9 2.52 9221 29.54 23.64 21.91 21.99 28.86 23.46 22.~4 23.6 28.5 3.1 1.68 9222. 28.18 23.31 28.44 2~.18 28.68 22.I~ 21.12 23.3 28.1 3.2 2.19 9223. 18.44 2~.96 19.45 ]8.31 28.89 19.~1 19.26 21.8 18.3 2.6 1.69 9224. 19.29 19.89 18.31 18.82 19.79 17.65 19.45 19.9 17.6 2.2 1.48 9225. 28.68 18.79 19.45 19.15 18.88 17.94 19.12 Zg.7 17.9 2.7 1.57 9226. 2~.79 18.2~ 19.89 29.87 17.62 19.96 19.35 28.8 17.6 3.2 1.73 9227. 22.15 18.24 21.18 28.81 18.62 28.15 2~.19 22.2 18.2 3.9 1.96 9228. 2~.43 17.61 Z~.63 28.68 21.49 22.16 28.75 22.1 17.6 4.5 3.14 9229. 28.87 Ig.lZ 28.92 21.18 21.85 22.1~ 21.~5 22.1 19.1 3.8 1.93 9238. 21.35 21.51 22.43 24.96 21.74 22.54 21.74 22.5 21.8 1.6 8.79 9231. 22.~4 28.48 22.87 28.78 28.57 21.14 21.28 22.9 28.5 Z.4 1.58 9232. 21.49 28.99 28.96 26.~8 28.81 18.97 28.49 21.5 19.0 2.5 1.51 9233. 28.43 21.54 19.74 19.2619.35 19.89 19.89 21.5 19.3 2.3 1.65 9234. 19.21 21.25 18.82 19.23 17.88 19.78 19.26 21.2 17.9 3.4 1.99 9235. 18.~7 26.51 18.~1 18.68 17.74 18.93 18.47 2~.5 17.7 2.8 2.84 9236. 18.74 19.85 18.79 18.38 18.76 19.12 18.85 19.9 18.4 1.5 1.81 9237. 18.15 19.34 17.83 18.24 18.83 18.71 18.32 19.3 17.8 1.5 1.82 9238. 18.92 lg.lg 17.32 18.71 18.69 19.45 18.82 19.4 17.3 2.1 1.58 9239. 18.99 18.35 18.93 19.12 19.46 18.97 18.98 19.5 18.3 1.1 8.64 9249. 19.36 18.27 18.71 2ff.15 28.28 19.45 19.48 2~.2 18.3 1.9 9241. 19.88 17.94 19.89 19.63 19.68 18.82 19.35 19.9 17.9 1.9 1.41 9242. 21.2~ 19.41 19.38 19.34 21.81 19.38 2~.18 21.2 19.3 1.g 1.82 9243. 22.71 18.38 21.~7 28.92 21.84 28.33 28.81 22.7 18.4 4.3 2.43 9244. 23.55 19.12 22.46 22.58 28.82 23.89 22.81 23.6 19.1 4.4 2.89 9245. 23.88 23.7] 22.58 23.46 19.65 22.21 22.96 23.9 19.6 4.2 3.31 9246. 28.28 22.28 28.15 19.63 18.36 18.97 19.89 22.3 18.4 3.9 2.39 9247. 18.44 18.71 17.83 16.88 18.51 18.86 18.31 18.9 16.9 2.8 1.43 9248. 18.18 18.46 18.64 18.tl 18.29 18.93 18.41 18.9 18.8 ~.9 8.52 9249. 19 76 19.~1 18.97 18.13 19.39 19.41 19.19 19.8 18.1 1.6 1.~7 PAGE 11 ARCO ALASKA INC. D,S.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS I PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 9258. 28.68 28.55 28.55 18.79 19.72 2~.92 28.26 28.9 18.8 2.1 1.47 9251. 21.89 21.36 21.54 19.52 20.35 28.63 28.85 21.5 19.5 2.8 1.33 9252. 21.38 28.81 28.44 18.71 28.86 28.18 28.52 21.4 18.7 2.7 1.81 9253. 21.46 19.81 21.58 19.68 23.76 23.85 21.42 23.8 19.8 4.8 2.41 9254. 24.48 21.36 22.72 22.94 25.~5 24.89 23.67 25.1 21.4 3.7 2.31 9255. 24.21 23.42 23.49 23.75 21.82 23.71 23.58 24.2 21.8 2.4 1.77 9256. 22.45 22.24 21.91 21.18 21.12 23.42 22.88 23.4 21.1 2.3 1.34 9257. 28.79 28.96 21,.25 28.78 1B.B~ 22.98 2~.87 22.9 18.8 4.1 2.07 9258. 18.96 28.22 29.96 28.33 18.36 21.36' 28.86 21.4 18.4 3.8 1.78 9259. 19.14 28.48 28.51 19.78 19.~2 21.18 28.09 21.2 19.8 2.2 1.88 9268. 19.43 18.46 28.99 19.15 18.99 2~.33 19.55 21.8 18.5 2.5 1.45 9261. 17.96 18.64 28.74 19.12 19.54 19,45 19.28 28.7 18.8 2.8 1.45 9262. 19.25 18.68 19.74 19.56 28.71 19.38 19.58 28.7 18.7 2.8 1.22 9263, 28.87 18.68 19.49 19.23 19.94 28.11 19.71 28.9 18.7 2.2 1.15 9264. 22.34 19.81 28.59 28.33 21.12 22,32 28.85 22.3 19.8 3.3 1.85 9265. 22.56 28.74 21.18 21.76 18.91 22.17 21.45 22.6 18.9 3.6 2.54 9266. 21.57 21.29 22.28 22.65 18.87 28.99 21.43 22.6 18.1 4.6 3.36 9267. 28.43 22.18 21.51 22.54 22.44 28.33 21.46 22.5 28.3 2.2 1.13 9268. 23.99 22.94 23.68 21.65 22.48 22.79 22.87 24.8 21.7 2.3 1.21 9269. 28.87 23.13 26.99 24.93 27.~7 26.69 26.25 28.1 23.1 4.9 3.13 9278. 38.98 28.42 32.39 29.67 28.~3 38.11 29.89 32.4 28.8 4.4 2.58 9271. 31.27 29.23 33.68 38.18 25,82 31.62 38.42 33.7 25.8 7.9 4.68 9272. 25.82 26.36 25.18 28.86 28,13 25.63 25.48 28.9 28.1 8.7 5.28 9273. 28.98 21.47 18.97 24.82 16.12 21.88 28.69 24.8 16.1 8.7 4.57 9274. 28.21 14.96 14.96 21,87 15.35 18.53 17.58 21.1 15.8 6.1 3.48 9275. 15.98 16.62 t6.0~ ~7.57 16.~g .~.~7 16.50 I7.G 16.8 1.6 1.~8 9276. 17.88 14.96 17.57 16.83 17.37 17.68 16.83 17.7 15.8 2.7 1.87 9277. 17.38 16.62 16.21 15.48 16.88 17.65 16.53 17.6 15.4 2.2 1.12 9278. 17.26 16.43 16.54 17.68 15.90 15.59 16.56 17.7 15.6 2.1 1.12 9279. 16.53 17.17 16.54 17.87 16.88 15.92 16.58 17.9 15.9 1.9 1.28 9288. 16.97 15.48 16.95 17.57 15 98 16.95 16.61 17.6 15.4 2.2 1.21 9281. 18.88 15.15 18.38 15.66 16 85 15.63 16.76 18.4 15.1 3.2 1.62 9282. 17.93 15.87 19.34 16.47 16 81 18.16 17.28 19.3 15.1 4.3 2.14 9283. 18.29 15.88 19.89 17.17 17 48 19.52 17.89 19.9 15.9 4.~ 9284. 17.74 18.13 18.46 19.49 28 97 18.13 18.71 21.8 17.7 3.2 2.26 9285. 16.57 16.91 17.82 18.53 18 32 15.87 16.97 18.5 15.1 3.5 1.89 9286. 17.12 16.65 17.65 14.78 16.45 15.88 16.58 17.6 14.8 2.9 1.72 9287. 17.45 17.61 18.27 17.43 17.84 18.85 17.63 18.3 17.8 1.2 8.64 9288. 21.16 17.57 19.74 17.57 18.47 19.26 18.87 21.2 17.6 3.6 2.29 9289. 22.71 17.83 24.44 19.84 19.83 22.28 28.94 24.8 17.8 6.2 3.11 9298, 24.29 28.26 25.22 22.94 23.48 22.61 23.17 25.2 28.3 5.8 2.91 9291. 23.85 22.57 27.72 23.27 25.46 24.67 24.36 27.7 22.6 5.1 3.36 9292. 23.85 24.93 26.69 25.51. 27.51 27.58 26.18 27.5 23.8 3.7 2.26 9293. 24.51 23.35 22.17 26.87 22.63 25.85 24.12 26.1 22.2 3.9 1.95 9294. 28.13 25.18 18.71 23.97 28.64 21.14 21,65 25.2 18.7 6.5 3.54 9295. 17.67 28.84 17.43 21.48 17.29 28.66 19.84 21.4 17.3 4.1 2.35 9296. 18.15 19.15 18.28 19.85 16.71 19.26 18.68 19.9 16.7 3.1 1.97 9297. 18.37 17.94 16.73 19.12 17.84 18.71 17.93 19.1 16.7 2.4 1.28 9298. 17.67 16.99 17.43 17.54 16.68 17.87 17.38 17.9 16.6 1.3 8.78 9299. 18.I5 16.65 18.28 18.49 18.32 18.53 18.26 18.5 16.7 1.9 1.61 PAGE 12 ARCO ALASKA 1NC, , D.$.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS I PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 9388. 18.37 18.38 16.73 18.38 9381. 8.38 6.65 8.13 19.81 9382. 7.35 6.69 7.35 28.87 9383, 9.38 9.15 6,73 28.29 9384. 9.34 15.18 9.89 19.81 9385. 8.68 11.76 18.22 28.44 9386. 18.63 12.87 8.93 21.~1 9387. 18.26 11.91 9.96 23.24 9308. i ~,11 11.83 18.15 21.95 9389. ~.41 15.48 11.62 17.98 9318. 18.51 11.15 12.76 17.24 9311. 11.47 11.65 16.69 17.65 9312. 11.32 16.14 15.11 17.54 9313. 12.15 19.62 12.63 19.78 9314. 13.97 21.14 13.64 19.52 9315. 18.59 '14.85 14.26 18.68 9316. 14.74 16.65 &8.58 28.74 9317. 13.53 22.43 65.54 23.68 9318. 15.55 19.34 65.54 22.13 9319. 31.32 25.11 65.54 21.58 9328. 35.55 19.51 18.71 28.15 9321. 5.55 5.55 $.55 19.71 9322. 5.55 5.55 5.55 19.23 9323. 5.55 5.55 5:58 19.41 9324. 5.55 5.55 5.58 19.41 9325. 5.55 5.58 $.58 18.97 9326. 5.55 5.55 5.55 19.52 9327. 5.58 5.55 5.55 28.74 9328. 5.55 J.58 $.55 22.39 9329. 5.55 5.55 J.55' 22.67 9338. 5.58 5.58 8.58 21.51 9331. 5.58 5.58 5.58 22.39 9332. 5.55 5.55 5.58 27.68 9333. 5.58 5.58 $.58 29,82 9334. 5.55 5.55 5.55, 29.45 9335. 5.58 J.58 8.58 26.65 9336. 5.~5 5.55 5.58 24.54 9337. 5.55 J.55 ~.55 18.42 9338. 5.55 ~.58 5.55 17.28 9339. 5.58 5.55 B.~8 15.51 934~. 8.~ ~.~ ~.B~ i6.6~ 9341. 5.55 5.55 $.55 17.24 9342. 5.55 5.55 5.58 17.72 9343. 8.58 5.58 5.88 16.57 9344. $.55 5.$8 8.58 16.47 '9345. 5.55 5.55 5.~8 16.95 9346. 5.55 5.58 J.55 18.95 9347. 1.15 5.55 5.55 19.58 9348. J.J5 J.55 5.J5 17.17 9349. 5.55 5.55 ~.55 15.77 2.58 18.69 19.46 28.28 19.68 21.81 21.84 28.82 19.65 18.36 18.51 18.29 19.39 19.72 28.35 28.86 23.76 25.85 21.82 21.89 18.88 18.36 19.82 18.99 19.54 28.71 19.94 21 12 18 91 18 87 22 44 22 48 27 87 28.83 25.82 28.13 16.12 15.35 16.38 17.37 2.74 15.56 18.4 2.6 15.8 7.98 19.45 13.64 19.4 6.7 12.8 6.88 18.97 13.36 25.1 6.7 13.4 6.69 19.45 14.41 25.3 6.7 13.6 7.68 18.82 14.58 19.7 9.3 18.3 5.18 19.38 15.33 21,8 8.6 12.4 6.73 28.33 15.83 21.9 8.9 13.5 6.98 23.59 16.68 23.2 1~.8 13.3 6.64 22.21 16.55 22.2 18.1 12.1 6.16 18.97 14.38 19.8 9.4 9.6 4.97 18.86 14.81 18.9 18.5 8.3 4.29 18.93 15.25 18.9 11.5 7.5 3.78 19.41 16.84 19.4 11.3 8.1 5.51 28.92 16.69 28.9 12.1 8.8 4.68 25.63 17.47 21.1 13.6 7.5 3.83 25.18 17.71 28.9 14.3 6.6 3.44 23.55 21.89 68.5 14.7 45.338.11 24.89 24.28 65.5 13.5 46,535.75 23.71 21.97 6:5.5 15.5 45.538.56 23.42 25.96 68.5 25.1 39.934.88 22.95 25.83 35.5 18.7 11.3 9.17 21.36 9.85 21.4 18.4 3.811.51 21.18 9.61 21.2 19.$ 2.211.56 28.33 9.71 28.3 19.8 1.318.62 19.45 9,72 19.5 19.4 5.1 9.81 19.38 9.65 25.7 19.8 1.711.86 28. I1 9.97 25.1 19.5 8.618.14 22.32 15.56 22.3 28.7 1.611.76 22.17 11.58 22.4 18.9 3.511.31 25.99 1/.55 22.9 18.1 4.812.37 28.33 15.75 22.4 28.3 2.111.69 22.79 11.24 22.8 22.4 8.411.56 26.69 13.54 27.7 26.7 1.814.15 35.11 14.91 38.1 28.8 2.115.28 31.62 14.72 31.6 25.8 5.816.89 25.63 '12.81 26.7 28.1 6.513.84 21.85 18.98 24.8 16.1 7,913.14 18.53 9.21 18.5 15.3 3,2 9.32 16.47 8.24 17.3 16.4 5.9 9.84 17.68 8.68 17.7 15.5 2.2 9.88 8.33 17.~ i6.1 1.6 9.32 7.95 17.2 15.6 1.7 9.29 8.84 17.7 15.9 1.8 9.68 8.83 16.9 15.9 1,1 8.92 8.24 16.9 15.6 1.2 8.62 8.47 18.2 16.8 2.2 9.69 9.45 19.5 17.5 2.518.87 9.54 21.8 18.1 2.811.43. 8,58 18.3 15.1 3.3 9.74 7.94 16.4 15.8 5.7 8.51 15.98 15.59 16.88 15.92 15.98 16.95 16.85 15.63 16.~1 18.16 17.'48 19.52 28.97 18.13 18.32 15.97 16.45 15.88 PAOE ~3 ARCO ALASKA INC. D.S.9-18 DEPTH SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA SIGMA NLHI NLLO HILO DIFL FT. PASS 1 PASS 2 PASS 3 PASS 4 PASS 5 PASS 7 AVG. 935g. B.IB I.Bg 8.gg 17.28 17.~4 18.~5 8.64 18.1 17.~ 1.~ 9,41 ~R1 iVlO~ll ,.r,l! G21_ SG~i RAT:t FRO" ~i,!~O0.O0 TO 9520.00 LEVEL RPACTNG 0.5000 125, SAmPlES PER RKCORO OAGE ] ARCO OIL. ~R~_IDHOF BAY .... NORTH D/%TA EVERY I SA~PL RBO0.O0 219.05 15.02 9'~00.50 221.00 15.02 ~801.00 209.77 15.02 880~.50 200.24 15.02 880P.UO 195.65 15.02 ~02.50 ~6.57 15.02 R50~.~0 160.81 15.0~ ~90~.50 137.97 15.02 8BO~,.O0 219.05 15.02 ~B0~,.50 223.00 15.02 8805.00 209.77 15.02 8805.50 200.24 15.02 flgOg. O0 195.A5 15.02 8Bdg.50 186.57 15.02 8907.00 160.91 15.02 ~B07.50 ~.~7.97 15.02 BBOA,O0 117.70 15.02 ~50~.50 ~05.0! 15.02 A~09.00 90.A~ 15.02 $~09.50 ~0.3~ 15.02 ABIo. O0 7&.56 15.02 8810.50 79.1.2 15.02 8811..00 '79.~5 15.02 8811.50 79.85 15.02 ~BI?.O0 82.54 15.31 ~12.50 92,31 15.02 881~.00 101.71 15.02 ~13.50 lO~.O& 15.02 S~14.00 117.~6 15.02 ~Blq.50 !25.27 15.02 88]5.00 !29.91 15.02 ~81%.50 129.30 15.02 ~l&.O0 1..2~.4~ 15.02 881~.50 ~,28.~5 15.02 8817.00 125.~0 15.02 ~!7.50 1.25.52 15.02 8~la. O0 ~27.25 15.02 881A.50 12~.66 15.02 8~19.00 %16.36 15.02 851o.50 110.1~ 15.02 ~820.00 101.95 15.02 B~20.50 9~.16 ~5.02 R821.00 88.&4 15.02 q821..50 84.98 15.02 8829.00 77.53 15.02 ~.50 6e.7~ 15.02 ~32~.00 64.8~ 15.02 ~23.50 G1.29 15.02 8~2~.00 63.00 15.17 B~2~.50 73.75 15.17 a825.00 8~.5~ 15.02 ND SAg .... 9:.S, 9,18 LOPE!,ALASK~ HLAC 6727 ES 821 SS~I 0.91 30,21 0.89 30.79 3.15 0.84 30.90 3.24, 0.83 30.72 3.10 0.82 29.80 3.23: 0.89 28.55 3.28 O.B8 29.~7 3.15 0,8~ 30,61 3,0.2 0.91 30,21 3.08 0,89 30.79 3,15 0.8~ 30.90 O,B3 30.72 3.10 0.82 29.80 3.23 0.89 28.55 3.28 5'59 5.55 5.7~ 5.81 5.59 5.~ 5.18 5.15 5.59 5.55 5.7~ 5.81 5.59 5. ~+~+ 5.18 0,88 5.15 O.8q 5.33 0.69 5.15 0.72 5.0~ 0.75 5.11 0,80 5.26 O,B1 5.33 0.88 5.11 29.~7 3.1,5 30.Al 3.02 .29.76 2.80 29,10 2.85 28.26 2.85 28.63 2.8~ 28,00 2.86 27,82 2.95 27.~9 ~.0~ ~.96 ~.63 ~.56 5.00 5.0~ 5.15 5.18 5.29 5.0~ 5.0~ 5.29 0,81 0.79 0,~7~ 0,78 0,78 0,87' 0,9~ 0.88 . 0.83 0.78 0.85 5.15 0.75: 5.22 O.Bl ~.96 0.78 27~.67 28.3~ 29.58 29'.91 28.63 27.60 28.96 29.51 30.9~ 31,05 31,05 29.80 30.39 30.17 3.08 2.95 2.~8 2.85 2.89 2.91 2.9~ ~.95 2.96 3.07 3.15 3,05 ~.96 2,9~ 5.35 5.15 5.11 5.15 5.26 5.:53 5.33 5.55 5.92 &. 0,.'5 5.77 5.77 5.85 0.85 30.06. 3.0~ 0.85 29,62 3,18 0.90 29,321 3.18 0.99 ~0.66 3,19 0.92 29.36 0.97 29.03 3.21 0.9~ 29.99 3.29 0.83 28.96 3.26 1.00 28.7~ 3'32 1.0~ 29.36 3.171 0.91 29.21 3.07 0.~6 29.29 3.05 0.92 29.80 3.!3 0.92 ~0.21 PAGE ? ARCO OIL AND SAS .... 3,S. PRIIOHOE', ?,AY .... NORTq ,SLOP~.,ALASKA DATA E',/ERY i SAMmLES 9-18 HLAC 67A7 GR3. ~82~.50 88.fl5 15.02 8826.00 8%.25 15.02 A82~,.50 73.99 15.02 8827.00 68.7q. 15.17 ~827.5I] GG.06 15.02 g82q.00 71..~7 15.31 ~82~.50 83.6% 15.02 aB2q.O0 ].00.61 15.02 ~2q.50 11%.0~ 15.02 8~.00 ].19.%~ 15.02 ~830.50 120.39 15.02 8831..0~ 1..!G.~8 15.02 A~31.50 %12.~5 15.02 B~52.00 110.50 15.02 8~32.50 !19..65 15.0~ BB~5.00 ~22.59 15.02 ~B3a. O0 ~,2a.9% 15.02 ~63~.50 131.26 15.02 ~5.00 ~29.~0 15.02 ~83S.50 118.%% 15.02 BS~.O0 110.7% 15.02 883&.50 126.13 15.02 8857.00 1%5.91 15.02 ~37.50 ]57.63 15.02 a~SA.O0 152.75 15.02 6~.%0 152.75 15.02 ~S~.O0 150.~5 15.02 8B~9.50 152.26 15.02 S~O.O0 157.1~ 15.02 SS~n.50 15a.~1 15.02 ~8~1.00 15~.a5 15.02 a~.50 1%1.51 15.17 SB~.oO 1~.71 15.02 ~2.50 150.67 15.02 a~.O0 150.0& 15.17 80~.50 138.5~ 15.02 ag~a. O0 131.S7 15.02 8~.50 105.86 15.02 88%5.09 109.65 15.02 BB~S.50 ]15.55 15.17 ~B~.O0 12~.20 15.17 gB~&.50 ].2&.q~ 15.31 88%7.00 136.65 15.~6 88~7.50 157.&1 15.~6 ~%~g.00 155.%1 15.~6 88~.50 137.73 15.31 ~5%~.00 136.1% 15.~6 ~2t~q. SO 13q.~O 15.~6 8~50.00 151.87 15.~6 $11 S21 5.7~ 0.95 8.1% 0.97 &.%3 1.06 7.06 1.25 7.1~ 6.8~ 1.30 6.3~ 1.22 29.36 28.66 3'30 27.56 3.1% 27'.7~ 3.00 .27.52 2.~6 27.78 28.77 2.93 5.7% 1.00 29.58 ~.96 5.11 5.15 5.15 5.15 5.11 5.15 5.00 ~.82 %.7~ ~.85 ~.85 ~.~5 0.89 30.06 3.02 O.B~ 31.27 2.94 0.64 30,61 5.10 0.70 30.13 3.~1 0,7~ 29.95 0.70 30,28 3,18 0.72 30,83 0.7~ 29.~7 3:.20 0.8~ 29.03 3.23 0.75 ~8.81 ~.~5 0.78 28.~8 3'.32 0.83 28,0~ 0.85: 27'78 ~.~6 O,B~ 27'7~ 3.16 ~.7~ 0,78 28.11 5'.!$ 5.0~ 0.83 27.56 3.21' 5.0~ 0.82 28.0~ 3.05 ~.96 0.85 28.37 2,99 5.22 0.85 28.18 5.26 0.81 28.~ 5.07 0.~0 26-79 ~.85 0.87 26.71 ~.71 0.92 27.~1 %.93 0.89 28.~8 ~.89 O.B1 ~O,M5 5.0q 0.69' 31-35 2.99 3.0~ 2.99 2.95 ~'05 2.86 2.8~ ~.82 0.65. 51.6~ 2.95 ~.78 0.~2 31.38 ~.97 ~.93 0.61 32.23 ~.00 ~.93 0.61 50,87 3,01 5.55 0.78 29.5~ 5.70 0.87 29.~2 ~.05 5.59 0,89 29.07 2.96 5.~ 0.86 28.92 2,96 5.29 0.8~ 29,1~ ~.97 5.~% 0,80 29.52 5.15 0.92' 28.7q ~.08 5.11 0.89' 29.~2 ~.9~ 0,8~ 29.88 ~.15 ~.96 0.85 29.~6 g.89 0,95 50.50 5.15 0.75 ~0.50 5.~g 0.7~ 30.7& 51.29 D&OE ;~ ARCO OIL AMD SAS----DoS. 9-18_ PRt~DHOF BAY .... NORTH SLOPE,ALASKA HLAC 6727 DATA ~_E\IERY I SA~DLES BG5].,50 109.{~9 15,75 8850,00 107,57 15,75 B~5o,50 101,95 15,75 885~.00 9~,99 15,75 855.5,50 9~,G~ 15,75 855~,00 9~,99 15,75 8S5q-,50 95.12 15,75 8855,00 93,0~ 16,20 ~855,50 100,2% 16,20 BBS&.O0 101.~3 16.20 88%A.50 9G,09 16,3~ 8~57,00 9g,02 15,75 8557.50 98,gl 15,02 8858,00 ~00,61 12.52 885n.50 9A,90 8,25 885q,00 9~,~1 3,53 8S5~,%0 89,01 8860,00 88.Aq 1,18 ~BGA,50 92,51 0,59 ~B&I.00 92,80 0,59 AB6~,SO 91,70 0,59 8862,00 95,60 0,~ 8B6~.00 1~2.36 0.~ ~56%.%N 15P.8~ 8867,0fl 113,06 0,~ ~G7.50 108,67 O,~g BBGa. O0 lll.3& 0.~ 2562.5o 1.2o.51 0.~ 82a9.o~ 12a.7~ 0.~ aB6q. SO 122.22 a~?n. OO 119.17 0.~ 887N.50 115.58 287~.5o lo5.~7 0.~ ~7p.50 lOS.Sg 0.~ a~7~.50 87.~o O.g~ RB7~.O0 8~.62 0.~ S~75.50 7~.~ 0.59 887~.00 90.72 O,g~ Sll S21 5.26 0.75 5.37 0.Sq 5.33 0.92 5.18 0.81 5.07 0.81 5,18 0,88 5,29 0,99 5,37 0,92~ 5,15 0,92 5,26 0,80 5,15 0.75 5.15 0-.77 5.~ 0.~ 5,29 0,86 5.~0 0.81 5.22, 0.7~ 5.26 0.71 5,15 0,82 5.26 0.81 SGM1 30.10 28.88 28.51 28.11 28.22 29.10 ~AT1 3.!6 ~.15 3.12 3.27 31.18 30.2~ 3'30 29'.95~ 29.25 3.18 29.8~ 3'15 30.10 3.02 30.28 3.08 30~79 31.16 31.27 29-36 a'1~ 29.~0 3.08 ~0.10 ~.99 ~,96 ~.89 ~,71 ~,60 ~,85 5,0~ ~,89 ~,82 ~,78 ~.78 ~.78 ~.89 q,96 ~,82 ~.71 ~.~9 ~.~5 ~.56 ~.7~ ~.71 ~.7~ ~.71 ~.9~ 5,15 5,07 5,0~ ~,gl ~.56 ~.93 0.78 .29.10 3.00 0.79 30.02 3.07 0.78 29.88 3.13 0.80 30.28 0.~0 30.06 3.15 0,71 30.02 3.08 0,69 29.25 3,10 0.68 28.92 3.13 0.75 28.77 3.13 0.74 29.03 3.12 0.70 28.55 2.93 0.75 29.62 2.9~ 0.72 28.63 2.96 0,81 28.15 3'05 0,80 27',7~ 0,78 27.15 31.30 0,78 26,~& 3,31 0,89 27,~ 5,q2 O.BO 28,071 0.78 29'5g 0.75 29.10 0.78 29.32 0.77 50.$2 0.75 30.68 0.72 30.39 0.78 0.88 0,88 0.85 O.BO 0.75 0.79 28.92 27,56 28.29 28.66 29.88 29,0~ 28,15 3.27 3.15 3'13 $.07 3.0~ 3.12 3.23 3.19 3'35 3.33 PAGE q ARCO OIL PRIIDHOF BAY .... NORTh1 S DATA EVERY ND S.~S----3,S, 9-3.8 LOPE, ALASKA HLAC 6727 ES 887~.50 '1.0~.79 0.~4 0877.00 120.05 0.~4 7377,50 129.18 0.~4 a~7a.oo 1~4.43 0.44 ~gT~o('l~ 131.75 0.~4 8B~aoO0 103.79 0.44 8880.50 102.56 A881.00 98.05 0.44 gB81.5O 98.29 0.44 gBg?.O0 114.29 0.44 B88o,!50 123.81 0.44 8883.00 12~t.66 0.44 A88~.50 132.4~ 0.44 8~8a..00 139.44 0.44 888q.50 ]_44.81 0.44 8885.00 141..76 0.44 8884.10 1.36.39 0.44 R887.00 128.98 0,4~ ~887.50 121.49 0.44 A88~.00 12M.81 0.~4 BBSA.50 12~.54 0.44 BgAq. O0 116.2~, 0.44 868q.%0 110.01. 0.44 ~890.00 110.26 0.44 48a©.50 ]08.42 0.44 ~891.00 106.M5 0.44 ~83!.%0 104.27 0.44 g492.00 I03.5~ 0.44 ~g9P.50 107.20 0.44 889'5,00 99.02 0.44 8891~.50 97.07 889q..Ofl 9q.75 0.~4 B39'~..~, ~, 106,:,), 0.44 8Bq%.OO 11~.04 0.44 8894.00 111.7~ 0.44 8BqG.50 109.40 ~8q7.00 106.47 0.59 889'7.50 llD.Tg 0.44 8qgf~.O0 114.55 0.44 859~.50 ]17.70 0.~4 889Q.00 125.64 0.44 8Sgq.50 ~B~.94 0.44 $11 S21 SSM1 RAT1 5.15 0.90 27.49 5.45 5.35 1.04 27.26 3.29 5,70 1,11 28,7~ 5,28 ~.03 1,00 29'62 3,20 6.25 0.90 29,~7 3.14 6.14 0,95 28.9~ 5,18 ~.03 1.03 29,25 6,21 1,02 28.96 ~ 3.02 6,14 1.03 28.11 2.97 ~.2! 1.08 28,55 3,01 6,~g 1,09 28.51 2.94 5,9~ 1,05 29'05. 2.86 5.51 0,91 29,7~ 2,99 ~.85 0,75 29,51 4,7q 0,7~ 31,20 4,85 0,70 30,39 3,27 ~.93 0,78 29.47 3,34 5.00 0,78 28,92 3.17~ 4.85 O.B3 .29,58 $.7B 0,74 29.80 4.89 0,85 27,96 5'50 4.89 0.80 28.26 5.00 0.80 28.92 5.29 4.85 0.75 29'.32 5.07 0.76 28.85 ~.17 5.04 0.78 28.88 4,94 0 75 27.~9 ~.°0 ~,85 0,83 27'.~3 4,96 0.89 27,~9 4.78 0.81 28.63 4.74 0,78 28.59 3,26 4.6~ 0.84 28.37 4,56 0.85 29,10 5,~7 4.~1 0,75 29,0~ 4,45 0.69 ~8.70 ~.~7 4.26 0.69 28.92 ~,~0 ~.26 0.75 29.~5 4.56 0.7'3 29.97 3.ql 4.7~ 0.69 30,~2 $,~7 4.78 O.&8 28.92 3.21 ~.74 0.~0 28.22 ~.12 4.63 0,88 28.00 3,13 4.82 0.90 27.9~ 5.1~ 4.67 0.77 27.52 ~.14 4.71 0,78 28.77 HLAC~ 67~7 7 £JRvES : ~R7 ~"t~,.17 ~].'? G?? RGM7 RAT'?' XIj'L FRn'~ $~00.00 TO 9320.00 ,1.~q, qA:'~lPl ER PER RECORF) PAcE 1 qRCO OIL ^NO SAS .... mR~lrli.iOF BAY .... NORTH SLOPE:,aLASK~ 9-18 HLA~ 6727 GR7 MON7 D17 G27 ~[~O~.qO 94.3A 14.13 ~.23 0.59 29.7~ ~80n.50 ~9.1~ 1~.15 ~.12 0.5~ 30.15 ~01 O0 ~.~ . . ~. 14.1.~ ~.19 0.56 ~01.~0 q~.77 1~.1~ ~.15 0.5~ ~2.~ aqO0.O0 9~.~ 1~.1~ $.2~ 0.59 29.78 ~0~.50 ~qq.lB 1~.~ ~.12 0.5~ ~0.15 GGO'~.Oq 8~.52 1~.1~ ~.19 0.56 ~1.25 q~O~.50 ~.77 14.15 ~.15 0.5~ ~2.2~ ~Oq. O0 ~ lq 1~ g 08 0.5~ .... . _ . .2a . . . ....... ~ lq.t~ ~.2~ 0.5~t 51.&5 · ,. ~ao,~.no O~.~ ~.t~ ~.93 0.52 3t.5! ~S0=,.50 165.08 1~.15 5.79 0.50 51.~2 ~0~.50 125.52 1~.1~ ~.2~ 0.~9 29.9~ a~07.~O lO~.g7 1.~.1~ ~]OB 0.55 29.01 R807.~0 9~.~R 1~.15 ~.2~ 0,59 29.78 830a.50 qA.~2 14.1~ ~.19 0.56 ~1.25 880~.50 8a.2a lq.l~ ~'.08 0.5~ ~!.Sg 8&lo.Oo 9~.6~5 1~.15 ~.2~ 0.5g 31.65 q51~].5~ 95.5G lq.l~ ~.9~ 0.52 ~1.51 ~!~.00 321.~9 15.99 4.08 0.54 30.29 ~81o.50 1.27.5~ 1~.!~ ~.90 0.~8 ~0.26 ~Glz.%0 1~.19 1~.28 ~.75 0.51 ~0.~7 ,,5 14 1~ ~,90 0.57 30.81 a~-%l~. O0 140. ~ - . ~lq. OQ lq0.05 lq.l~' ~.82 0.50 ~.4~~ ~51q.~O ~.3~%. 55 115.99 ~ 71 0.~5 31.95 ~Rl&.O0 1.55.7~ 14.1~ 5.86 0,50 31,18 ~81~..50 1.$5.~1 14.1~ 4.15 0.59 29.96 ~9,17.00 l~.Pl 1~.1~ 5.97 0.&8 29.56 · ~817.50 1,1.7.5~ 1. q.l~ ~.75 0.~1 28.82 galn, .O0 ),lq.g~% lq.)5 ~.79 0,59 Pq~ BO.__. a~l~.5~) 119.17 lq.l~ 5.79 0.61 29.2~ q51q. O0 11~.58 14.1~ 5.75 0.61 29.01 ~81~.%0 11..0.5~ 1~.1~ $.86 0.60 50.51 , ~20.qo 10~.00 lq.l~ 5.8~ 0.5~ ~0.77 ~2~.50 ~7.91 1~.1~ ~.01 0.S0 ~0.88 ~821.00 80.B~ 1~.1~ $.97 0.~ ~0.55 · ~a21.50 7~.a7 1~.1~ ~.2~ 0.~ ~0.29 ~2~.50 a0.22 lq.15 ~.~9 0.72 50.51 ~a2Z.O~ a~.lO 1~.1~ ~.15 O.&~ 29.26 . ~ ........ lq 1,~ ~.08 0.~ 29.60 ~5~.00 92.~1 1~.15 ~.19 0.66 29.01 ~52s.~0 a~.~ !4.1~ 4.8~ 0.88 28.~2 RAT7 ~.'7~ 3.74 5.79 5,72 ~.7~ 5.7~ 5.79 ~.~7 5.75 3,72 3.7~ ~.79 ~.~2 ~.~7 5.~7 5.7~ 5.78 3.97 ~.~7 ~.0~ 5.78 5,95 ~.97 ~.08 ~.25 g.2~ ~,97 g,O~ ~.9~ ~.59 ~.75 ~,5~ ~,g5 ~,6g ~.~7 ~.55 MLL~ 30. O~ 29,83 50.05 30.05 29.80 gO.07' 29.71 29.6~' 29.78 30.05~ 30.05 29.60 29,78 ~0.11 30.00 29.82 29.96! 29.89 29.98 29.+3 29.50 29.~3 30.9~ 30.2~ 30.07 29.91 29.50 28.65 29.60 29.5t 30.15 29.78 30.~ 29.80 28.8:0 28.91 29.65 29.$2 29.02 29.89 29.0~ 29.67 29.85 29.9~ 30.&8 ~0.93 30.20 29.7'1 29.60 PAGE] 9 AIICO 0 PRI~DHOF F~;~Y .... ,~40R DATA Ew~PY 1 S IL AND T4 SLOPE, ALASKA AqPLES ~8~27.~0 10~.79 R83o.00 ~861.00 1..29.0~ ~8~&,O0 ~7.0~ ~37.00 15~.7~ ~A3~.50 1_5~.24 ~84~.50 1~9.82 R8¢+!.0~ 151.~9 A8~.5~ 13P.4a ~84~.00 ~3~.77 ~8~.50 121.12 ~8~.00 121.25 ~844.50 1.~S.14 aB47.50 147.99 ~B4~.O0 BB4q. O0 14~.59 ~B4q.50 ~5~!.5~ 127.72 MO~7 S17 627 14.13 5.33 1.00 14.13 5.55 1.08 1~.1~ 5.37 1,12 1~.1~ ~.85 O.BO 1~.13 ~.~5 0.59 1~.15 ~.75 0.58 14.1~ 5.68 0.50 14.1.3 3 57 1~.13 3.53 0.~4 lg.l~ 5.79 0.51 14.1~ ~.64 0.51 15.99 ~.79 0.5~ 1~.13 3.71. 0.59 lg.13 $.~6 0.53 1~.1~ 3'75 0.55 1~.13 3.86 0.56 13.99 ~.82 0.5~ 1~.28 5.60 0.53 1~.13 5.~9 0.~G 14.13 ~.GO 0.51 13.99 3.79 0.56 15.99 ~.?1 0.58 lg.15 5.97 0.58 1~.15 5.95 0.60 l~.l~ ~.19 0.59 i4.t~ 5.75 0.5~ 14.1~ ~.55 0.58 1~.1~ 3.27 0.56 1~.1~ ~.$5 0.50 1~.13 3'31 0.51 lq.13 3.38 0.55 lq-.13 3.55 0.63 14.13 3.53 0.53 1~.13 3".~2 0.52 1~.13 3.86 0.56 1~.13 3.75 0.5~ 1.~.13 3.97 0.57 14.1~ 3,75 O.G1 1~.13 3"64 0.56 1.~.1~ 3.53 0,57 13.99 ~.~9 0,5~ 1.4.13 3.68 O.GO I~.13 3.68 0.58 13.99 3.60 0,53 1~.13 5,79 0,~6 1~.13 ~.86 0,50 1~.13 5.97 0,53 1~.1~ 3.93 0.58 1~.15 ~.08 0.55 9-18 HLAC 6727 29.0~ 28.53 ~.7~ 32.=2 32.~1 33.20 32.90 ~.~2 31.~7 ~1.1~ 29.65 29.58 28.27 28.71 ~0.18 29.78 50.66 ~0.00 ~0.26 29.52 50.~0 50.29 $0.88 50.11 29.0g ~0.22 52.28 52.61 ~0.~5 ~0.00 28.97 27.85 27.76 27.~9 27.~5 28.q9 28.6~ ~0.59 50.88 ~0.85 50.11 51.0~ 29.56 3.57 3.78 3.91 ~.OG ~.89 $.79 ~.G2 ~.~2 ~.10 3.Gl ~.71 3.?~ 3.?~ 3.?~ 3.G~ ~.?0 B.71 ~.70 ~.67 ~.5~ 3.97 4.01 4.17 ~.?0 ~.5~ N!LL~ 291.15 29.01 29.~1 29.01 29.52 29,7~ 29.26 29,58 30,33 ~0,66 29,98 30,13 30,09 30,28 29,98 29,08 29.0~ 29.2~ 29.2~ 29.q9 30.40 30.70 30.q6 29.79' 30.05 30.27 ~0.12 29,19' 28.93 29.06 28.18 28.~8 29.63 30.0~ 30.33 30.4~ 30.59 29.5~ 29.63 30.26 ?9.GY 29.1~ 29.~2 28.7~ 30,15 ~9,93 29,78 30.50 30.29 P9.30 PAGE .~ ARCO {.)IL PR:ID',qf]F BAY .... NORTH ]ATA EVFr-,'Y I. SAi,lm ¢;R7 NON a.B51 .00 1.26.25 1'4.1 8851 .50 llG.&l 1.'4.1 a859.00 1.0q..~5 14.1 R85P .50 1 0R.91 1`5.9 a85u.50 9a.05 1~.1 a85s. O0 9a.5~ 1~.1 281A.00 9a.05 lq.1 ~85~.50 101.q9 l~.l ~857.0& 107.08 1~.1 8857.50 10~.~6 1~.1 agS~.O0 1 0~.79 14.1 8~5a.50 ~ 05.49 15.9 aBGo. O0 132.72 1~.1 286~.50 1.39. ~4 1~.1 a864.00 ] ~9.1.9 13.9 8864.50 ~1.62 1~,1 qSg~.50 ].?g.~g 13.9 q~,7. O~ !30.65 lq.1 ~aGT.SO 130.49 1~.1 S~6~.O0 129.91 lg.1 qS,7, q. 00 117.46 1~.1 8R7n .00 1.10.99 t4-.t qh70.5~ 1 lP. ~ 1~ .1 BP, 7! .00 8871 R879,00 96.0~ 1, g.1 RBTo.SO 90.60 lq,1 q87~.0~ 36.45 1~.! R~74.60 89.26 lq.1 ~B75.00 10q.89 RBTm.50 ]17.83 lq.1 AND SAS .... D.S. SLOPE,aLASK~ [.ES 9-18 HLAC S!7 '4.15 3.97 '4.15 ~-.12 ~.01 '4.04 3.97 3.86 3.82 q-.15 ~.01 3.82 5.9`5 ~.90 3.75 ~.68 3.60 5,71 3.75 3,71 3.71 3.38, `5.71 3.79 3.60 3.71 3.79' 5.68 3.75 3.53 : . 3.6~ 3.57 3.57 3 3.60 3.71 3,60 3,6~ 3,64 3.49 5.68 3.79 3.97 ~7 0,59 O.G1 O.G1 O.G1 0,65 0.68 0.70 0.56 0.58 0.56 0.5~ 0,53 0.55 0.57 0.~8 0.'45 0.52 0.51 0.51 0.5~ 0.58 0.50 0.~9 0.~5 0.50 O,G1 O.~B 0.51 O.~B 0.~6 0.53 0.56 0.50 0.56 0.52 0.~ 0.~ 0.'48 0.56 0.5~ 0.59 0.53 0.52 0.52 0,59 O.GO 0.70 0.76 0.73 6727 28.93 30.18 29o0~ 28.38 28.01 26.99 e9.85 30.~0 30.29 31.10 30.33 30.37 30.15 29,35 31.75 31.95 31'29 3~.02 30,92 30.q8 31.73 30.37 29,30 31.29 31.14 ~1.07 30.99 3!.18 30.~ 31.~0 30.29 30.15 30.~ 30.88 29.78 29.7~ zg. R9 28,57 27,98 28.82 30.22 29.89 27.57 26.95 25,48 25.63 26,5~ 2~.05 3.50 3.67 3.79 3.64 3.59 3,51 5.62 3.7~ ~.0~ 3.84 ~.82 5.9~ ~.79 5.80 ~.0~ ~.27 ~.~0 ~.02 ~.0~ ~.75 5.~3 ~.6~ ~.75 5.51 ~.&7 ~.78 ~.7~ 5.53 3'35 5.~0 3.54 3.55 3.~0 3.G~ 3.70 3.67 3.G5 3.75 3.59 3.56 29.0~ 28.55 28.51 28,18 28,95 29.6~ ~8.97 29.83 29.13 27.98 28.58 29.~1 ~8.93 28.82 28.75 ~8.~0 29.52 29.10 28.88 28.07 27.79 29.01 29,26 29.25 29.32 28.77' 28.55 28.~8 28.63 28.51 28,86 28.82 29,50 29,28 29,~50 B0,96 30,77 30,70 30~0 30,68 29.85 28,92 28.82 28,76 ~8.66 29.78 30,15 29.89 PAcE u. ARCO OIL AND ~I'~!.i~')H,OF BAY .... NORTH SLOPE,ALASKA 9-18 HLAC 6727 8n7&.%0 ~50.92 ~R77.00 qGTv. Sq 887g.00 12n.63 5qaO.50 1.27.84 ~S~! .Pq 139.~'7 q~! .50 13q.22 · q882.50 14~,91 qaa~.50 qB~4.sh 1 RR~R.50 141,.27 q~'7.0O 127.11 q5~7,~0 ~.24.gl ~58~.00 q~t~,%O 121,9A 889n. 50 ~ 16.2~ RB91 .00 ~891,50 I18,9~ R~gP.o0 11.5.63 aSgZ.OO ~0~.15 ~59~.50 !.10.26 ~89a.50 122.95 aSDm. O0 120.15 fiBq~.O0 1.24.42 q997.00 129.55 5897.50 i51.75 ~9~.OD qSgq. O0 346.R9 MO~I7 1'~, 13 1~.13 lg.!3 14.13 ig.13 14.13 15.99 1[~.1~ lq-. 13 1~.13 1~.1~ 1~.1~ 1~.15 14.15 l~,99 14.13 14.15 14.1~ 14.2~ 14.1~ 14.15 14.1~ 1~.1~ 14.1~ 1~.1~ 14.1~ 14.1~ 14.1~ 14.1~ 14.13 14.1~ 14.1~ 1~.99 14.1~ 14.15 1~. 15 S17 S27' S$~7 ~AT7 ff.30 0.75 27,65 3,56 4.3~ 0.78 27.50 ~[19 0.76 27,68 ~.~0 0.80 28.68 3.52 ~.41 0.77 28.68 3.37 ~85 O.BO 30.29 3.60 ~.12 0,73 30,26 3.85 ~.49 0.6~ 31.32 3.55 O.k9 31.65 3.73 3.60 0.~5 29,60 3.78 3.57 0.59 30.88 3.95 ~.57 0.5~ 31,7& ~.6~ 0.57 ~2.98 ~.~2 ~.68 0.~5 31.25 3.57 0.~5 29.30 3.78 3,57 0.~9 28.~ 3,53 0.5~ 29,15 ~.75 5.5~ 0.5S 51.0~ ~.~0 ~.60 0.~ ~0.07 3.~9 0.~8 29.19 3.BT ~,~9 0.59 ~0.00 ~.00 ~.57 0.54 ~0.59 5.&8 ~.60 0.50 29.89 ~,75 0.59 ~0.00 5.&l ~'.95 0.59 50.85 3.82 0.51 30.~0 3.67 3.60 O,g6 29,89 B.79 3.57 0.5~ 30,~1 ~.ll 5'.5~ 0.58 52.21 ~.20 3.38 0,49 $2.2~ ~.1.1 3,35 0.~3 30.88 ~.~5 3:.38 0.48 30.88 ~.19 3.38 0.~7' 31.07 3.20 0.~8 3~.&2 ~.37 3.38 0.~3 31.03 ~.08 5.G8 0,50 31.73 ~.01 3,53 0.47 30.33 3.~ 3.35 0,55 30.04 3.60 3.38 0.59 31.07' 3'.49 0.5~ 31.51 3.35 0.52 31.32 3.~6 0.~8 30.26 3.51 NLL:' 89.52 28'8~ 29!. 26 29I. ~7 29 25 29~0~ 28~07 28 95 29 Ol 28 75 29471 291q7 29 O1 ~9;38 29.~5 29.30 29.06 30.~15 29.;76 30.~59 ~9.93 29.83 29.90 29'.93 30,63 30.18 30.22 29.~2 30.S? 31.10 30.81 ~0.~0 ~0.0~ 29.56 29.~5 29.61 29.0~ ?-cC ~Ilt~'Ii~ ER $7.,.? 7.0 0 ARcO 9'I'L Ai,lO GAS .... D.S. 9-18 PRilOHr~F gAY .... ,~,IORTI.-I SLOPE,ALAgKA GR~ ~"10~,15 GI~ 025 SG~vI5 R:AT5 NLAC G7~7 FRn~ 88oo.n0 TO 932o.00 LEt/EL RPA£¥~IG 0.5000 BAY .... NOR IL AND SAS .... TH SLOP~'ALASKA A :,q o L E S 9-18 HLAC 6727 ~00,00 21~,8o 15,02 5,22 ~B90,50 213,31 14,B7 5,lB q801 .00 ~07,G9 15.02 A801,50 20~,5R 1~.~7 5.lB q~Op.nO 1.99.27 1~,87 5,29 ~80~.50 177.ffl 15.02 ~BO~.00 l~q.q3 15.02 5.33 ~OA,SO 1~B,94 15,0~ 5,37 ~OU.O0 21R,SO 15.02 5.22 ~BO~,%0 213.31 1~,87 5,18 8g05,00 207,&9 15,02 g.89 g505,50 20~,12 1~,87 5.18 RSO~.flO ]99,P7 1~,87 5.29 q80¢~,50 177,41 15,02 5,~ ~8~7.00 %4~,95 15,02 5.~3 A807,50 ~28,94 15,02 5.37 A~OA,O0 115,&8 15,02 5.33 ~80A,50 lOR,O& l~,B7 5.q~ ~99,00 95,45 15,02 5.48 ~809.50 88.89 15.02 q210,00 79,2~ 1~.87 5,29 ~810,50 72,27 15,02 5,5~ 8B1],O0 80,3~ 15,02 5,~8 ~Bll,50 8~,a9 ~.87 5.63 gSlP,O0 9~,1~ 15.02 5.~0 B~12.50 1. OK,'~9 15,0~ 5.55 8815.00 111.5& 15.02 5.6~ a~!i~.59 lla.68 lg.87 5.70 ~81a.O0 121.37 15.02 5.29 a81~.50 12q.~7 15.02 5.15 881~.00 141.6' 15.02 5.18 8~15.50 l~g.~8 lg.87 5.29 ~61~.00 ~.95 15.02 5.40 0,81 0,75 0,75 0,73 0,70 0,70 0,71 0,70 O,B1 0,75 0,75 0,73 0,70 0.70 0.71 0,70 0.72 0.76 0,66 0.76 O,B6 0.Sq 0,75 O,B3 0,77 0.70 0,70 9,~ 0.$8 0.88 0.80 0.83 0,67 SG~5 30.05 29.B3 30.05 3a.05 30.57 31.19 30.53 30.68 30.05 29.8~ 30.05 ~0,05 30.57 31.1.9 30,53 30.G8 31.08 30.53 30.79 29.98 29.~3 29.50 2~.91 29.90 30.24 30.09 30.27 28.~7 28.G5 29.9~ 30.12 31.26 30.8G ~AT5 3.GO 3.~ 3.52 3.G7 3.91 3.81 3.48 3.52 3.G7 5.49 ~.&4 ~.~1 ~.9~ 5.9~ 4.0~ 4.0~ 4.~4 4.01 4.05 4.00 5.95 3,6G 5,57 3,58 PAGE p ARCO 0 PRI IF),HOF [~/3-, Y .... R!OR DATA EWERY ] S IL AND SAS .... Td SLOPE!,ALASK& A~DLES 9-18 HLfiC 6727 GR5 982~.5n 94.02 ~82~.00 85.15 4824,.5fl 69.1l 8827.00 67.16 A827.SA 74.60 382R.00 8g.57 882q.00 112.~1 382~.50 122.59 qS~.O0 127.q7 ~8~.50 ~32.36 ~5~1..00 130.28 q831.50 12~.74 88~P.00 12q.45 88E~.50 154.92 qS~l. OO 1~8.46 88~.50 14~.30 883~.00 153.~8 883~.50 11.9,05 ~.00 1~1.99 ~8B~,50 14B,22 qS~.O0 ~5~,2~ ~SB&.50 q~7.00 164.96 ~S~7.50 160,07 88~,00 16B,25 ~.50 166,2% 88S9.00 16~.67 aggn,oo 1~7,25 884~.50 148.72 8841.00 15~.67 886!.50 151.04 ~Sq.?.O0 !42.74 aB~*0.50 !27.%1 88~.00 llg.YB 84~q..00 lOB.q2 884q.50 109.~0 BSq~.50 126.~7 aS~.O0 130.28 a~4a.5~ 134.92 8547.00 144.69 q847.50 141.88 881*8.00 1~8.96 68~a.50 1~7.~7 886q.50 136.87 q~%0.00 12g.74 ~85n.50 lla.19 MOM5 5.02 5.92 5,02 5,73 5.02 q,87 7.~9 5.0? 7.50 5.02 ~.84 5.02 ~.14 4.87 5.37 4.87 5.11. 5.02 ~.93 5.02 5.11 5.02 5.11 4.87 5.~0 4.87 5.22 4.87 5.29 5.02 5.15 5.02 5.0~ 4.87 5.04 4.87 4.93 4.87 ~.93 4.87 5.07 ~.87 5.07 5.0~ 5.26 5.02 5,40 ~.87 5.59 5.02 5.66 5.02 5.35 5.02 5.3~ 5.02 5.15 4.87 5.1~ 5.02 5.33 4.87' 5.0~ 5.02 4.85 4.87 4.89 g. B7 5.02 5.15 5.02 5.44 4.87 5.56 5.02 5.44 5.02 5,48 5.02 5.48 5,02 5.29 5.02 5.33 5.0~ 5.15 5.02 5.04 5.02 5.15 4.87 5.29 ~.87 5.40 5.02 5.04 5.02 4.85 5.02 5.25 G25 0.89 1.00 1.08 1.03 1.03 1.04 0.92 0.77 0.70 0.61 0.68 0.7~ 0,80 0.7~ 0.72 0.75 O.B5 O.SO 0.72 0.73 0.84 0.75 0,80 0.89 0.8~ 0.73 0.75 O.g5 0.67 0.65 0.~0 0.79 O.B~ O.BO 0.78 0.70 0.76 0.72 O.B3 0.95 0.83 0.73 0.80 0.73 0.69 0.73 0.72 0.72 0.82 0.78 0.87 SG~5 28.g5 29.17 29.90 29.57 28.95 30.24 31.41 31.08 31.74 30.97 ~9.98 29.87 30.09 29.98 29.98 28.43 29.B2 S0.57 32.00 31.01 30.38 29.98 29.43 29.79 30.05 30.27 30.12 29.35 29.06 28,1.8 27.63 28,5~ 28,76 29.76 29.2~ 29.28 28.58 28.18 29.79 31.0~ 30.~6 31.30 30.75 B0.46 30.42 29.87 29.21 28.95 28.91 29.21 3.73 3.35 3.30 3.21 3.20 3.27 3.BO 3.89 3.97 ~.03 5.98 ~.80 3.72 3.85 ~.~5 3.5& 3.59 3.71 5.72 3.~7 3.67 3.64 5.53 ~.50 3.62 3.51 3.60 3.73 3.78 5.68 3.75 3.71 3.74 3,81 3.7~ 3.4~ 3.57 PAGE 3 'ARCO O"IL AND,GAS .... D~.S. PRUDHOE BAY .... NORTH SLOPE!~ALASK!A HLACi DATA EVERY 1 SAMPLES 8852.00 109.q. 0 1~.. 87 ..5.33 0,9! 28.36 8852.50 102.08 15.02 5._~_. q.o 0,93 28,18 8853.00 10L1,.27 15,02 5~,4q· 1.02 29:,2[ 3~,59 8855.00 108.79 15,02 5.70 0.88 29-83 8855.50 106.59 5.~.. 87 _5_L. 33 0.85. 29.13 3.71: 885~,. oo 100.00 15.0~ 5~;. 5.6 0.80 27.?~ ~, :.79 ~85~.5o ~o~.~ ~.o~ ,S ~.~ o.7~ ~9~.~, ~59.00 9~.38 15.02 5.~ 0.70 29.13: 886~.00 9~,33 1~.87 5?07 0.80 28~88 3:;73 8861.50 96.83 15,02: ~.85 0'~ 28.07"~ -~s~.oo zo~.ss 152~~~~ ~;~ .... ~;~ ~.o~ .: ~:~?~`~.:L~.~.~:~.~L:~.~:~2~.~L.L2~L~:~:~::~::2~::~:~:~:~2:..`~L.~:~.~:.~~?~;~:;~:.~;~./.~:.~L`.~`~`.~.~`~.;~.~.~:~`~.::::::::::::::::::::::::::::;~;~L.~2~/~:~;~ 8873.00 8~.98 15.02: ~::, 7~ 0.75: 2e,eo 8873.50 81.32 15.08:- ~'56~ 0.75 28*58 3~.9~ 887~.00 78.51 -15.02: ~'~0 0.73 2-8,76 '"' ~'~"~"~';"~"~ ........... ~'~ ["";'~'~:: ............... i"~':;'~'"~ ~';'~'[: 6";'~'6': .......... ~'~'~"'~ ~' ........................ PAF, E q DATA r_\!c RY ,ARCO OIL AND SAS .... NORTH SLOP£,ALASKA I SAMPLES 9-18 HLAC~ 6'727 8877.%0 q879.S& ~5~q. O0 BS~.O0 ~83~.0D ~8s~.5~ 9890.00 8891.00 8891.50 ~39p.00 ~89~.50 BRgA.O0 lq~5.91 15n .2~ 12~ .91 1.15.g7 ~0~.~0 13~. g 0 i3l.lq ] 3~. 80 ! 31.99 130.53 ! 39. ],19.29 ~,1~.53 119.5~ 117.70 11~.~3 112.70 11~.09 113.19 95.12 1.0~,0~ ].19,05 ].la ,52 12a ,71 12~,8~ 1~,09 1~0,90 aON5 915 lq.87 5.7ff 15.02 15.02 ~.51 15.02 $'.~7 15.02 6.10 1~.87 5.77 1~.~7 5.92 15.02 1~.87 15.02 6.29 1~.87 5.85 1~.87 5.22 15.02 ~.82 15.0P ~.7~ 19.67 ~.96 1~.87 ~.9~ 1~.~7 ~.85 1~.87 15.02 15.02 5.00 1~.~7 5.0~ 15.02 5'.18 1~.87 ~.93 15.02 ~.7~ 15.02 ~.96 1~.~7 5.00 1~.87 5.00 1~.87 5.29 15.02 5.0~ l~.B7 ~.85 15.02 ~.9~ 15.02 5.00 15.02 5.00 15.02 5.15 15.02 ~.85 15.02 ~.85 15.02 ~.82 !~.B7 ~.85 15.02 5.00 1~.87 5.15 15.02 5.11 15.02 5.18 1~.~7' 5.26 1~.87 5.18 15.02 5.15 1~.87 ~.89 15.02 ~'.78 0.78 0.~ 0.92 0.95 0.95 1.05 1.10 1,03 1.16 1.1~ 0.88 0.88 0,78 0.92 0.84 O.B3 0.75 0.75 0.71 0.70 0.73 0.70 0.67 0.78 0.72 0.69' 0.69 0.73 0,72 0.72 0.80 0.83 0.80 0.75 0,78 0.73 0.76 0.77 0.78 0.86 0.81 0.75 0.76 0.78 O.&O 0.75 0,78 29.90 28.8~ 28.65 28.62 27.~8 28.1ff 29.21 27,58 27.99 28.65 28.25 29,68 28.07 28,95 30.2~ 30.82 31.26 50,27 $0,2~ 30.86 30.8G 30.09 29.06 31.85 30.90 30,79 30,20 29.76 2B.RO 28.69 29.83 29.90 30.~9 31.08 29.83 28.21 28.10 28,0~ 27.&6 28.73 29,72 29.32 29.~6 29.72 29.~1 29.61 ~AT5 3.71 3.55 3.32 3.38 3.51 3.53 3.59 3.62 3.73 3.78 3.78 3.73 3.67 ~.88 3,90 5.B1 5.98 3.9~ 5.92 ~.09 3'.~7 3,73 3.79 3.78 3.9~ 3.79 3.78 3.~7 3.68 ~.71 ~.~0 ~.~9 5.~5 ECC NUVeEn 6727.00 ARCO OIL A~]D GAS .... D.S, 9-18 PR~iDHOF ~AY .... NORTH SLOPE,ALASKA HLAC 6787 6 CJRVES .' I~'lO~lq- ~1~ G2q- SGl'V!,~ RATq. FRoM BDO0.O0 TO 9320.00 LEVEL gPACTNG 0.5000 125. gAMPI. ES PER RECORD PAGE ! ARCO 0 P R t.! .,31--t 0 E BAY .... NOR DATA EVERY I S 8800.00 8800.50 8801.00 8801..50 125.76 8802.00 RSOp.50 97.aO 830~.00 87.q2 8803.50 79.85 880a.~0 19~.2a 880%.00 880~.~0 12~.76 A806.50 92.80 ~807.00 87.~2 8807.50 79.85 ~80~.00 77.53 88~.00 75.5~ ~BOq.50 ~0.83 8S10.00 $9.7~ ~Bi~.O0 100.98 881~.50 1~7.58 ~812.00 ~26.1~ ~812.59 l~6.1q ~813.00 ~27.~6 8813.50 ~2~.82 881~.00 126.25 881~.50 881~.50 1~7.~8 8~1~.00 157.12 8516.50 1.25.15 8817.0~ !1G.00 q817.50 ~1~.~ aS1A.O0 ~06.72 ~Blg.50 100.¢~9 ~819.00 97.g~ 8820.00 79.9a A820.50 71.18 8821 . 50 gM. 7~ 8822.00 7~.87 ~822.50 8~.27 ~2~.00 90.~8 882~.50 8%.~5 882~.00 7g.80 8824.50 67.1~ 8825,00 IL T~ SLOPE!,ALASK& AqPLES = 02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.07 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.02 5.0~ 5.02 5.02 5.02 5.17 5.02 5.02 5.02 5.02 A~.!D SdS,,--O,S' 9,1_8 _ . HLAC 6727 5.26 5.63 5.55 5.63 5.70 5.~ 0.70 29.3~ 0.80 30.59: ~.OG 0.75 ~0.~ 0.84 31.14 3.98 0.83 29.60 3.9~ 0.93 28.~2 ~.01. 0.99 29.71 ~.01 5,59 0.88 29,60 3.~9 5.26 0.70 5.33 O.BO 5.63 0.75 5.55 5.63 5,70 0.93 5.~ 0.99 5.59 0.88 5,92 0.84 5.88 0.88 5.96 0.91 ~.10 0.89 5.88 0.88 5.99 0.82 5.88 0.80 5.99 0.88 5.R5 0.80 5.7~ 0.76 5.6~ 0.~2 5.~4 O.gl 5.~3 0.78 5.~ 0.81 5.55 0.78 5.7q 0.80 5.59 O.B~ 5.~7 0.73 5.18 0.76 5.33 0.81 5.07 0.85 5.33 0.93 5.~0 0.90 5.59 1.01 5.55 1.1~ 5.92 1.1~ 6.21 0.98 5.99 1.02 6.1~ 0.9~ 6.14 0.81 5.7~ 0.72 5.92 0.65 6.58 0.82 7.10 0.9~ 7.7~ 0.9~ 29.3q 30.59 50,~ 31.1~ 29.~0 28.82 29,71 29.60 30.00 30.15 ~0.?~ 30.66 30.26 30.~B 31.~0 32.2~ 31.80 29.71. 30.22 30.00 29.63 30.0~ 30.15 ~9.78 29.08 29.23 28.35 28.31 27,98 27.57 25.7~ 27.61 29,89 28.35 29.67 31.36 32.21 ~1.~1 31.65 31.07 29.60 3.92 ~.06 ~.05 3.98 3.94 ~.01 g. O1 3,89 3.82 3.96 ~.6~ B.52 3.N9 $.~1 ~.50 3.57 3.71 3.71 3.70 ~,~7 3.3a 3.86 ~.78 ~.60 ~.?1 ~.5~ ~.60 3.76 PAGE 2 ARCO 0 PP, I!DHOF RAY .... NOR DATA E\IFRY I S 8B2~.50 6q.71 ~2&.O0 75.09 ~82~.50 89.38 8827.00 lOq.~8 8B27.59 115.87 882A.00 ~.2g.~1 ~28.5~ 8829.00 ~.2~.91 882q.~O 117.22 8830.00 11G.2~ 8850.50 ~2~.7~ 8831.00 !35.78 6~1.50 ~t.51 88~2.00 I~.~0 ~8~.~ I~.19 ~833.50 121.12 8~3~.50 137.gl 883%.00 151.1& ~35.50 ~83g.00 15~.3G a83~.5~ 14P.72 ~8~7.0~ 152.1~ B837.50 150.45 8S~.00 I~7.01 B8~.50 152.99 883g.00 1~1.51 88~9.50 157.36 ~8~0.00 1~%5.~G 8~q1..00 1~%.&7 88~2.00 12~.69 B8~%2.50 llq.gg 88~.0~ ~1~.7~ 8Bg~.50 105.01 Ag~.O0 111.~8 ~8~q.50 ~,23.~0 ~A~.O~ 1~0.53 88,5.50 133.%S 8B~g. O0 135.65 8~46.50 !37.36 ~3q7.00 %~0.7q ~8q7.50 1~1..27 ~a. O0 13B.71 88~A.50 136,39 ~8~9.5q 112,70 8B50.00 113.80 IL AND GAg .... D.S. 9-lB TH SLOPE, ALASkA HLAC AMDLES 5.02 7.72 5.02 7.28 5.17 6.62 5.02 G.32 5.02 5.7~ 5.O2 5.55 5.02 5.22 5.92 5.29 5.02 5.29 5.02 5.63 5.02 5.63 5.31 5.7q 5.02 5.7q 5.02 5.51 5.02 5.53 5.02 5.37 5.02 5.00 5.02 5.0~ 5.02 5.15 5.02 5.~R 5.02 5.77 5.0~ 5.7~ 5.0~ 5.7q 5.02 5.92 5.02 5.~3 5.O2 5.15 5.02 5.29 5.02 5.37' 5.02 5.~ 5.02 5.~ 5.02 5.40 5.02 5.44 5.02 5.59 5.02 5.85 5.02 5.88 5.0~ 5.77 5.02 5.7q 5.02 5.85 5.02 5.85 5.02 5.55 5.02 5.1.5 5.02 5.00 5.02 5.11 5.17 ~.96 5.02 5.00 5.02 5.11 5.02 5,!8 5.02 5.11 5.02 5.07 5.02 5.37 5.02 5.~ 6727 G2g SGM4 1.11 29,78 1,0~ 29.01 1.02 29,89 0.89 29.9B 0.70 30.0~ 0.08 30.81 0,7'0 29.71 0.76 29,96 0.79 30.88 0.79 28.82 0.93 29.30 0.91 31.07 0.81 30.15 0,76 30.29 0.79 29.7~ 0.79 ~7.72 0.89 27.79 O.B~ 29.25 0.77 29.23 0.81 29.~9 0.89 30.~0 0.85 31.65 0.75 30,~8 0,58 30.0~ 0.8~ 30.18 0.75 ~1,~6 n.5B 30.7~ 0.G7 29.19 0.85 28.93 0.88 30,18 0.73 29.82 0.73 30.48 ri.g5 29.03 O.B1 29.56 0.81 30.0~ O.R~ 30.33 0.81 30.~ 0.53 30.59 0.76 29.71 0.83 29.63 O.BO 30.26 0.73 30.90 0.08 29.56 0.7~ ~0.96 0.7'0 31.!B 0.73 30.~8 0.81 29.93 0.89 30.33 0.86 30.88 0.81 31.43 0.71 30.33 ~.18 3.23 3.gl 3.sq 3.67 3.68 3.GB 5,77 3.82 $.8~ ~.01 ~.9~ 3.61 ~.5~ 5.08 3.7G 5.7'1 3,95 3.93 3.~1 3.49 3.35 3.~8 ~.~8 ~.57 ~.59 ~.57 3.37 3.~9 3.OG ~.01 5.1.1 ~.~5 3.~1 5.g9 ~.5~ 3.58 3.51 5,53 3.gO 3.&l mAG[ ~ ARCO OI PRUDHOI~ BAY .... NORT DATA EVERY 1 SA 8851 .00 99.88 8851 .50 96.58 8852.00 93.55 ~85~.00 91.~2 ~35~,50 g5.97 885a..50 96.09 8355.00 q5.16 8855,50 9~,58 B~5~.00 96.21 ~857.00 101..10 3857.50 lOP.G1 ~858.00 lO0.O0 B353.50 10~.~0 BBSq. OO ].02.56 B~60.00 101,10 8361.00 !lO.Tg 8BgP.OQ 119.90 ~665.50 12R.82 866q.00 12~.~0 a~&~,50 125,0~ 886~,00 123.93 8865,50 120,39 8866.00 115.26 8866,50 115.26 ~367,00 122.10 8867,50 ]26.25 866A.00 129.~0 8869.00 ]21,25 8~6q,50 111,97 8870.00 105,~9 8B70.50 102.20 8871.00 100.73 8871.50 9~.17 887~.00 9g. R7 887~.50 9~.~ 887~.00 9P.19 8873,50 87.91 887~.00 91.58 8875.50 121.7~ 0 . . . l l O o . O . o o o . . o l o o . . . 5, 5. 5. 5. 5, 5. 5, 5, 5. 5. 5. 5. 5, 5, 5. 5. 5. 5. ~..; . L AND S.aS~---D-S- 9-1.8 H SLOPE,~LASK~ HLAC: &727 ~LES 02 02 02 02 02 $1 02 02 02 02 02 02 O2 02 02 02 17' 02 02 02 02 02 02 02 02 02 02' 02 02 02 02 02 02 02 O2 02 17 02 02 02 17 02 17 17 02 02 02 02 02 02 02 5.63 5.59 5,70 5,55 5.63 5.51 5.44 GPg SoMg RAT4 0,80 29'0~ 3,52~ 0,921 29,6~ 3,67' O,B9 2g.~5 0.92 ~0.11 3.59 0.85 ~0.26~ 31.61 0.79 50.63 ~,57' 0.?~ 50.74 3.54 5.~8 0,75 ~1,76 5.44 0,7~ 51,69 5.51 O.flq ~0,59 5.~8 0,84 29,56 5.51 0,78 ~0.29 5.66 0.72 29.71 5.70 .0,Sg 29.2~ 5.48 0.85 29.15' 5.~4 0.83 28.01 5.29 0.93 2~.6~ 37 . 5.29 5.07 5.~1 5.07 5,29' 5,33 ~.9~ 5.07 5.15 5,37 5.26 5.18 5.33 5.~3 5.4~ 5.26 5.00 5.29 5,51 5.~8 5.~0 5 .~ 5,37 5.4~ 5.48 0.93 0,86 0,~0 0,80 0,75 0,70 0,73 0,74 0,65 0,73 0,71 29,26 29,52 ~0.48 31,58 32,21 30,7~ 50,70 ~1,65 ~0,51~ 31,1~ 30,55~ 0.70 30.22; 0.75 29.89 0.75 28.38 0.80; 29.82: 0.78 29.50 0.8~ 28.86' 0.92 28.71 0.90 30.$~ 0.72 30.59 0,71 31,~0 3.40 0.69 31.07' 3.~0 0.7~' 30,77 5.5& 0.78 30,26~ 3',5g 0,81 50,96 _3.68 3.78 3.72 3.67 3.7~ 3.76 3.82: 3.79< 5,75: 3.68 5,71 3.83 3.95 3.85 3.9~ 3.65 3.65 3.55 3.5~ 3,~5 3.~3 3.37 5.51 0,76 30,77: 3,69: 5,~8 0,75 30,55~ 3,66~ 5,04 0,76 29,63: 3,73 5.04 0,78 29,411 5.15 0.80 29.3~ 3.78 5.4~ 0.80 29,15 3,82 5,77 0,8~ 29,82 ~.18 0.81 29.89 ~,53 PAGE 4 ARCO 0 PR!.~DFtOIr BAY .... NOR DATA EVERY I S IL AND SAS .... D.S. TH SLOPE,ALASKA 9-18 HLAC 6727 GR4, ~876.50 14],51 5~77.00 8577.50 !51.75 ~87~.00 122.10 8~7g.50 ]..13,~1 88~0,0~ ~88~.00 888q.50 1~9.9~ ~88~.50 133.62 ~887.00 122.95 8887,5~ 12],73 ~aaa,OO 11%.26 888~,~0 112,45 ~a~,O0 ~la.6a 8889,50 116.12 BB90.O0 ~89!.50 120.51 ~892,q0 1,07,69 ~"~92.50 105.62 889~.00 ~9~.5r~ 95.97 gSqg. O~ 10~.23 8R9~.50 111.72 889~.00 11~.68 889~.50 120.39 RRg?.SR 117.46 ~897.50 8898.00 127.72 8~98.50 8899.5~ ~3~.19 MOM~ 15.02 6.40 15.17 6.54 15.02 6.62 15.02 6.80 15.02 5.58 15.02 15.02 6.88 15,0~ 6.69 15.02 6.07 15.02 5.63 15,02 15,02 5.11 15.02 5.18 15,02 5.26 15.02 5,00 15,02 5,07 15.02 5.00 15.02 5.07 15.02 5.33 15,02 5.40 15,02 5.33 15.02 5.26 15,02 5,15 15,02 5.40 15,02 5.~8 15.n2 5.77 15,02 5,77 15,02 5,70 15.02 5.5l 15.02 5.33 15.~1 5.33 15.n2 5.~7 15.02 5.44 15.17 5.~7 15,02 5.~ 15.02 5.40 15,02 5.63 15.02 5.63 15.02 5.15 15,02 ~.Tq 15.02 5.00 15.02 ff.89 15.02 5.1.1 15.02 5.18 15,17' 5.18 15.02 5.29 15,02 4.89 624 0.86 0.9~ 1.09 1.00 1.05 0,95 1.08 1.02 0.98 0.91 0.86 0.80 0.85 0.88 0.84 0.82 0.78 0.80 0.89 0.9~ O.B~ 0.81 0.73 0.7~ 0.72 0.66 0.7~ 0.72 0.75 0.72 0.73 0.76 0.~ 0,61 0.~0 0.73 O.BO 0,82 0.80 0.75 0.73 0.70 0,~9 0.69 0.69 0.67 0.72 SSZ4 RAT4 30.66 29.23 3.28 29.85 ~.40 29.74 3.43 29.89 3,39 29.08 ~.30 29.63 3.2g 29.5~ 29.7~ ~.27 30.~8 ~.~ 29.30 ~.5~ 27,79 3,55 27.68 3.57 27.39 3.58 27.~5 3.5~ 28.38 3.56 28.16 3.67 2~.20 3.59 29.0~ 29,~8 ~,5~ 29,45 3.~0 29.67 3.70 29.71 3.79 30.77 3.89 ~].,10 3.R7 30.59 3.70 30.~ .5.73 30.1~, ~ . 78 31, q'O ,=;. ~,7 31.65 3.5~ 31.29 3.9'8 32.83 3.59 52.65 ~2.50 31.84 ~1.21 ~.77 30.70 30.22 3.87 30.~ 3.7~ 31.80 3.70 32.17 5.59 32.35 31.76 31.5~ ~.~0 31.62 5.53 30.70 ~.56 29.0g EcC i"t I ~ ~'I i~ E f--~, 6727.00 ARC~ O~L A~i~ GAS .... D.$. 9-18 PRu~I~-tC)FT F~AY .... NORTH SLOPE, ALASKA 6 C 'J F, V E,::, GR;' D'ION2 ¢,I2 G27 SG~I2 RAT2 HLAC 6727 FRo~ G~O0.OO TO 9~20.00 LEuEL RPACTNG 0.5000 lPS. ~&~°l Fg PER RECORD PAGE ]. ARCO OIL AMD 2AS----D,S, 9-18 PRtlDHOF GAY .... NORTH SLOPE,ALASKA HLAC 6727 DATA FVERY ! SAMPLES 800,00 19].,82 14,72 800.50 ~80,~6 14,72 ~1,50 1~2,61 14,72 802,00 129,67 14,72 ~0~.50 1.1~.65 14,87 ~O~.O0 94,99 14,B7 593.50 79.85 1~.72 BO~.O0 ~1,32 14,72 ~OqoSO 191.82 1~.72 BO5.00 180,~G 14.72 8Oc.%0 160.9~ 14.87 80&.50 129.67 1~,72 907.00 !1q..~5 14,87 807.50 9~.99 14.87 ~0~.00 79,85 1~,7~ 80~.50 ~.~2 14.72 90~.50 ~2,5g 1~,72 ala.50 3~.00 14,72 g!l. O0 9~.21 14,87 811.50 lo2,al 1~.87 512,00 10~,27 1.4,87 812.50 1!5.65 14.72 &!:Z,O0 122.10 1~,72 ~iz,50 127,55 14,72 81~,00 1:~!.26 14,72 ~.~.50 129.~3 l~.B7 ~I~,00 130,~5 lg,72 8!5.50 125,52 14,72 B!A,O0 12~,73 lg,B7 81~.50 1.25.03 14,72 817.00 12~,98 14,87 B!7.50 11&,61 14.87 ~ln. O0 112.~ l~.B7 819.00 ~05.66 14.87 819,50 95.~1 lg.,72 ~20,09 87,55 l~,B7 820.50 77.gl lg.87 821.00 66.06 lg,87 821,50 61,78 lg,87 ~2p.00 55,80 1~,72 82P.50 59,83 1~.72 923.00 70,33 lg,72 82:~.50 ~0.22 1~,87 B2a.O0 79.2~ 1~.72 R2u.50 75.09 14.87 825.00 67.28 14.72 $12 5,63 5,11 5.11 5,11 5.$~ 5,37 5,~ 5.65 5.~8 5,63 5,11 5,11 5,11 5.~ 5,57' 5,~ 5.63 5,55 5,63 5.7~ 5,74 5,7~ 5,55 5,04 5.11 5.11 5.29 5.22 5.g~ 5.~8 5.63 5,59 5,51 5,51 5,15 ~,96 5,0~ 5.00 5.18 5.15 5.5~ 5.q~ 5,63 5,63 5,74 5,6~ 5,51 5.88 0.85 28.71 5.10 0,90 27:.8~ 3.10 0,97 27,87' ~,10 0.98 29.~1 3.10 0.90 29.78 3.26 0.84 30.11 0,73' 29,67 0.70 29.65 0.75 29,78 0.85 28,71 0.90 27.85 0.97 27.87 0.98 29.~1 3,23 3,28 3,10 5,10 3,10 3,10 0,90 29,78 31,26 0,8~ 30,11 3,23 0,73 29,67 0,70 29,63 3.28 0.73 29,78 0,77' 28.68 0,~4 29.52 0.82 29'01 ~.~1 0.78 29.19' O.B1 50.00 ~.2~ 0.75 30.55 ~.32 0.79 30.74 3.36 0.81 29.67 3.29 0.75 29.82 0.61 29.6~ 3,37 0.~ 29.~1 0.67 28.60 0.79 28.31 3.50 O.B9 28.13 ~.37 0.88 28.13 3.28 0.7~ 28.5~ 3.~0 0.7q 25-96, 0.98 25.~8 B'.30 0.95 27.57 3.27 0.85 27.21 3.231 0.~4 27.21 ~.~0 0.~4 27.28 5.~1 0.89 27.6~ ~.~0 0.92 28.~2 0.97 28.09 ~,~7 0.99 27.50 ~.~9 0.99 26.99 5.12 1.01 27.28 5.11 1.05 26.76 ~.1~ 1.0~ 27.52 1.10 26.76~ 1.17 29.08 ~.2~ o ARCO 0 ? 1\ G E :. PRIIUHOF BAY .... NOR DATA EVERY ! S IL AND $~S .... ~,S, 9-1B TH SLOPE,AL~$K~ HLAC A727 A~mLES 8~25.50 56.90 ~'326,. 00 56.53 ~827.50 ~.p O0 109 882~.5~ 127,35 8830.00 12~,69 88:51 .00 117.22 ~8~ ,50 1.27.96 q832.0[~ 132,97 ~3P.Sr~ 883~.00 13G.2G 88~,50 1_31 ~83~,5fl 1B~,SO 883A.00 853G.50 ,~37.50 ~.52.3S ~839, Or) 16P.52 B~39,50 1.59,34 S~%0 · 50 1 50. !8 8~%1 ,50 ]54. ~S~3,00 123.08 F8~3,50 113.,~ ~9q.q.,50 88~,00 lq2,a6 a~q~,.Sn 1.~7.13 ~Sqq. 00 lq7.99 ~8~.50 t~'7.8~ ~,q4q. O0 141.51 R~50,O0 ~23,57 ~85q.50 !.2q.q2 MON2 $12 S~2 14.97 6.99 1..00 29,15 14.87 7.21 0.96 29,01 14.72 7.10 1.0~ 29,23 14.72 6.5B 0.~9 29.01 14.87 5.92 0.93 30,11 14,87 5,44 0,76 29,74 14.87 5.07 0.80 29.26 14.87 5.00 0,79 29,19 14.87 5.07 O.Bq 30.00 14,87 5.04 0,75 29,38 14.87 5.07 0.80 2B.90 14.72 5.15 0.85 29.19 14.87 5.29 0.8~ 14.B7 5.~9 O.B6 28.71 14,7~ 4,96 0.81 28.53 14.72 4.82 O.B6 29.08 14.87 4.9~ O.B$ 2B.05 14.72 5.11 0,92 29,19 14.87 5.4~ 0.B1 28.90 14.87 5.3~ 0.80 28.60 14.87 5.07 0.81 30.99 14,7~ 5.~ 0,70 50,70 14.87 5,~2 O.Tq 30,51 14.72 5.33 0.B0 29.0~ 14.72 5.44 0.~9 29.04 14.87 5.3~ 0.89 28.16 14.87 5.15 0.8~ 27.68 14,B7 q. B9 0.~6 28.46 lg,72 4.8~ O.B% 28.75 14.87 4.52 0.72 ~8.75 14.72 %.56 0.71 28.05 14.87 4.56 0,75 28.20 14.~7 4.82 0.80 29.01 14.7~ 4.96 0.76 29,01 14.72 4.85 0.75 14.72 5.04 0.76 29,04 14.72 5.29 0.83 28.05 14.72 5.40 0.85 26.36 3.4.72 5.~4 0.90 2~.69 14.B7 5.48 0.9~ 27.~ 14.87 5.~ 0.79 27.15 14,72 4.89 0.79 27,~5 14.58 4.95 0.78 27.65 1~.58 4.85 0.B3 27,28 14.72 4.85 0,82 27,24 14,B7 ~.84 0,88 lq.87 5.04 0.75 ~0,~7 1~.87 4.96 0.7~ 29.78 1~.87 4.7B 0.68 ~9o74 lq.72 %.8~ 0.65 14.87 4.89 0.7~ ~8,75 RAT2 3.16 3.25 3.36 3.27 3.21 3,30 3.38 3.27 ~.~0 ~.~2 3.24 3,34 3.54 3.~ 3.30 3,31 ~.~8 ~.~5 ~.~7 ~.~7 3,16 ~.~0 ~.45 ~,25 ~.~1 3.45 5.~5 5.45 ~.45 ~,49 oAGE ~ .ARCO OIL AND SAS .... D.S, PRI~DHOF BAY .... NORTH SLOPE',&L&SK'& DATA .,¢ .... Y I SamPLES GR2 MOW2 8851 .00 1.2.'5.0 J lq'. 87 ~851 .50 120,88 lq.. 87 5,22 8852,00 .1.09.77 1~..BY 5.26 ~85P.50 71.03.17 1~.87 5.59 q85.-4,00 !0~,37 1~,87 5.55 R q, 5,L'5.50 19¢,.10 1~,87 5.29 ~8_5~, 50 105,~9 1~,87 5,~3 885~,50 !00,98 lq.87 5.00 ~S&.O0 9~.~ 1~,87 5.00 885g.50 95,2~ 1~.87 8857,00 ~.01 .~ 8857,50 10¢~,15 1~.87 ~,89 885a,00 ].0~,15 1~.87 855q,50 100,~7 1~.7~ 5.11 885~.00 92,19 lq,87 .~85'V, 50 90,72 1~.72 8q60.00 90,60 1~.87 8860,50 91.21 1~,87 B86~ .50 ~. OP.al lg. B7 qqgP.5O 1'1~.~1 1~.87 ~.B5 ~86~,.00 ~26.8~ lq.72 ~.67 8~~ 5n 1, B1 6P 1~ 87 ~ 7q ~7.~ ~.15.~7 1~.87 ~.g5 8~67.50 ] 17.9~ 1~.87 g.~ 8~6~.50 ~.0~ 1~.87 ~.~ 8~70.~0 1~5.~6 1~.87 ~.~ 8870.50 ~10.~8 1~.87 ~.9~ ~871.00 108.67 1~.87 ~.0~ ~,87~.50 ~0.01 1~.7~ ~.~5 gCTP.O0 10~.~0 ~.87 ~.07 g87~.50 95.97 1~.87' 5.~ ~873.00 87.18 1~.87 5.0~ 8B75.50 82.5~ 1~.72 5.0g ~87q.00 82.30 1~.87 q.89 ~87q,.50 81.q1 1~.72 ~.82 ~975.00 10~.17 1~.8Y R~7~.50 110.13 1~.87 5.22 887~.00 119.17 l~.SY 5.70 9-18 HLAC 6727 $22 S9M2 0.77 28.20 0.8~ 27.59 O.B9 26,21 0.92 26,21 0,92 27.21 0.89 27.72 0,85 27'.2~ 0,88 86.07 0.95 26.03 0,91 26.10 0,91 25,~8 0,89 25.99 0.92 27.35 0.9~ 27.83 0,88 28.05 O.B5 28.16 0.87 27.32 0,86 26.1~ 0.85 26.32 0.85 25.77 0.90 26.95 0.89 27.17 0.8~ 26.76 0.85 2~.96 0,9~ 2~.30 1.00 26.51 0.82 27.02 O,BO 26.99 0.83 27.39 0.83 27,21 0.78 26,~3 0.75 25'66 0.79: 26,~3 0.77 27'.28 O.BO 28.82: 0.77 28,9~ 0.75 27"79~ 3.g9 3.g6 5.g9 3.3~ 3.~7 3.35 3,16 3,23 3.35 3.58 3.7~ 3.59 ~.7~ 3.71 3.60 3.~9 3.58 3.65 3.72 3.51 3.5q 3.67 3.76 3.75 5.70 3.65 5.55 3,~1 ~.q7' 3.51 3.59 O.BO 2,7.50 3.38 0.85 28.09 3.37 0.91 29-60 3.50 0.85 30.70 O,B~ 32,10 3,ql 0,69 31.62 3.37 0,73 29-85 3.36: 0.75 27,87 3.3~, 0.93 28,82 0.80 27,17 3.62 0.95 27.~6 5.~7 0.79 29.78 5.19 0.82 30,18 3.2~ 0.83 29.19 3'.~3 PA ~' :F_ ~-~ ^RCO 0 ~RU!3HOF ,-3AY .... NOR gAT~ ~\fF/.RY _1. S IL AND 2&S .... D,S, 9'18 TH SLOPE'ALASKA HLAC 6727 AYlPLES GR2 MOM2 8877.00 138.~ 1~.87 8877.50 1~9,~2 1%.87 ~BT~.O0 12L~.~O 1~.72 a87A.50 110.7~ 1%,87 8~7~.0[') ~06.10 1~.87 g57o.50 10S.27 1%.87 ~.50 ~07.~5 1%.72 8gal.00 1:t9,6~ 14,87 ~8A!..50 131.3~ 14.87 8aa?.oo 13a,75 14.72 B8~?.50 1.39,95 14-.87 8885.00 158.10 1%.87 888Z.59 1~1.05 14.87 8B8~.50 148.8q 8~85.00 ~4G.28 14.87 ~585.50 154.80 14.72 8B8~.00 152.97 14.87 888K.50 1~5.29 14.87 8887,50 1.19,17 14,72 aaSa. OO !11.60 1%,72 aGaa.50 111.23 14.72 388q. O0 llO.7q 14,87 8889,50 1.07,9~ 1~,87 ~890.00 ll%,q8 14,87 8891 .50 11~,~8 1~,87 ~89~.~0 115.68 14.87 aSg~.50 11.1.60 14.87 889~.00 105,7q 14.87 8~9M,50 lO0,2g 14,87 8~9~.00 95.97 14,87 889~.59 1.0~.66 14.87 aaqs.oa 1.0~.0~$ 14,87 8595.50 1~,68 14,87 a89&.O0 111,72 14,72 889~,50 108,06 14,72 q597.50 1,08.79 14.72 8~96.0~ 117.3q 14.72 8B9a.50 123.81 14.72 ~.OO 128.08 1~.87 ~9~.50 155.58 14.87 Gl2 5.9~ ~.29 6.18 g.O~ 6.18 21 · 6.07 5.63 5.15 5,00 4.82 %.78 ~.78 G22 SSM2 RAT'2 0.90 29,52 3,B7 0.93 29.78 0.89 29,26 3.~0 0.89 27'.5g 3.40 0,95 27,651 0,95 27,94 5.41 0,95 27,~6 0,99 27,17 0.91 27.06 5.~8 0.9~ 26.69 ~.~5 0.89 27.21 ~.~0 0.8~ 26.99 0.55 27'.87 3.51 0.77 29.$8 ~.55 0.78 28.58 ~.51 O.8G 28.75 ~.~5 0,71 29.71 3,~8 0.55 50.00 0.55 29.01 5.~7' 0.65 28,16 5'~9 0,72 27,~5 0,7~ 27,~9 ~,~9 ~.23 0.69 2:6.~7 3.51 ~.26 0.72 27.72 ~.~8 %.19 0.65 29.82 3.59 4,63 0,65 50,11 3,52 %.85 O.G7 29.12 ~,~8 4.89 0,83 29,60 3.57 4.85 0.81 30.59 ~.59 %.96 0.7~ 29.95 ~.~0 %.56 0.~5 28.05 5.~1 4,71 0,77 29,01 3,371 %.74 4.60 4.41 4.60 %.74 %.67 4.56 %.71 4.85 %.85 %.56 %.7~ 0.75 0.69 29.95 5.45 0.72 30.29; ~.19 0,6~ 30.22: 5.35 0.68 50.59 5.~9 0.7~ ~29.82 ~.6~ 0.77 ~0,~7 ~.57' 0,87 51,10 0,6~ ~0,81 ~,5~ O.gO ~0,00 5,51 0,72 0,76 50.~7 0.69 29.12 $.'57 0.75 28.g9 ~,59 26,75 EC~ 1~I!I~I3SR 6'727. O0 ARcO OIL ~,~0 G4S .... DoS. 9-18 PRLi3~tOFi B4Y .... ~]ORTH SLOPE,ALAS~<A 6 CJRVES : GR3 MON:~ ~1.3 :~:3 gGM3 RAT3 HLAC 6727 FR 0 ;'~1 9~00.00 TO 9320.00 LEVEL S P A C / ,",..tG 0.5000 125. RA""nPI..E?,, PER RECOR3 PAGE .1, ARCO PR].IOHOr BAY .... MOR i) A T,~ E V ,-"_R Y I IL AMD GAS .... 3'S. 9-18 Td SLOPE,~LASKA HLA£ 6:727 A~PLES GR3 8800,00 89.50 ..q. 80 I., OO A802.90 880~ 50 B80~.OO B80~,50 ~29.06 880~.50 ~BOA. OO 8B07.00 !.02, ~ 88~7,50 90,84 ~80~,00 8~,~7 880~,50 R5,27 8809.50 ~10,00 ~9,50 8810.50 92,~1 8811 ,00 101,~7 881~..50 109,65 ~81.2.50 11~,12 8~!~,00 12~.~ 881~,50 132,72 8814,00 1~2,25 ~8~4,50 129.06 88!~,00 129,55 8815,50 154,55 881~.50 127,59 8~17,00 124,66 ~5~.7,5~ I 25.69 .~8!a.O~ llk. 2~') 851a,5~ ~07,45 8~1~,00 99,27 .~, 881q.50 97.1.9 BB20.OO ql.94 ~8~0.50 B B 2'.1 .00 7~.51 9822.%0 60 882~.50 80.95 B82q.90 r34.7'+ ,,.4 · 50 83. A82rfi, O0 75.70 15.31 15.17 15.17 15.17 15.17 15.17 15.17 15.17 15.17 15.17 15.17 15.17 15.31 15.31 15.31 15.17 15.17 15.31 15.17 15.17 15.31 15.17 15.17 15.17 15.17 15.17 15.17 15.17 15,17 15.1.7 1= ~7 15.17 15.31 15.~1 15.31 !5.31 15.31 15.51 1.,5,31 15.17 15.31 15,51 15.31 15.17 15,31 15.17 15.17 15,17 15.17 15,31 15.31 5.10 5.88 5.81 5.~0 5.~8 5.51 5.74 5.77 5.81 5.59 5.59 5.59 5,63 5,37 5.7~ 5.99 5.99 5.9~ 5.96 ~.0~ 6.10 5.88 5.81 5.~0 5.~S 5.51. 5.?~ 5.77 5.81 5,59 5.59 0,8~ 30,0~ 3,57~ 0,83 29,56 3'56 0.90 29,63 3.51 0.83 30.0~ 3.5q 0,85 30.22~ 3.ql 0.80 30,07 3,53 0.80 30.~8 3.73 0,83 29.~0 0.9~ 28.60 5.74 0.95 29.60 $.~9 0,83 28.60 0.91 28.6~ ]..03 29.~0 0.77 30.51 0.81 30,00 0.89 29.82 0.92 29.96 0.91 29.89 0.91 O.8q 0.83 30.11 30,Off 29.56 3.66 3.72 3,57 3,55 3,50 3.56 3,43 3.53 3,57 3.56 0,90 29,63 3,51 0,83 30.0~ 3,5~ 0,85 30.22 3,4'1 0.80 30,07 3,53 0.80 30.~8 31.73 0,83 29,30 3,65 0.9~ 28.60 3.7~ 0.95 29.60 5.69 0.83 28.60 3,7~ 5.59 0,91 28,6~ 3,66 5.63 1,03 29,30 3,72< 5.37 0,89 30,~ 3,57 5.37 0,78 30,81 3,55 5,55 O.BO 30.g8 5,70 0.83 31.8~ 3,5g 5.66 0.74 32,65 5,7~ 0,65 32.87' 3,57 5.70 0.72 32.35 3.57 5.92 0.78 31.91 3.5~ 6.25 0.78 31.7& 3.51 6.58 0.85 31,58 3.~7 6.84 0.92 31.14 3.4~ 65 0 98 31 18 . ' · 6.58 l. O0 31.69 S.69 0.9~ 31.62 3.27 ~.62 0.86 ~1.21 6.58 0,93 30.77 6.69 1.00 29.711 3,62 7.21 1,13 29,60 PRtlOHOE F,,AY .... tlORT4 ..DATA E',,/E R Y 8825,58 Gl.90 882&,00 63,86 8826,50 71,18 ~827.00 85.23 8827.50 882a.50 115.92 8829.00 115.65 882q.50 122.10 885r,.00 12%.52 8830,50 126.57 8851,00 !27.q~ 8831,50 152.56 8852.00 157,7~ 8855.00 R83~.()0 1.22.7l 8~54.50 ].17.09 885%.00 885%.50 144.57 98~7.00 ].55.45 8857.50 15~.29 88~8.~0 88S~.50 8859.00 166.18 8~a.50 155.36 8540.0~ ~84~.53 136.87 8B41.00 1,42.61 8841.50 140.17 884~.00 137.00 8842.59 12~.20 884~. O0 115.02 88q~,50 1.09.28 88q~. O0 111.11 88~q,50 llO,O1 8845,00 115.75 88q5,50 88q~.00 127,55 88q6.50 1~0,5~ 88q7,00 8847,50 !58,58 884~.50 129,91 88q9.00 1~0,77 88~q.50 ]26.62 8858,00 11~.07 8850,50 ltl.SS AND ~&S,--,D.S. 9-18 SLOPE,ALASK~ PLES 15.31 15.17 15.31 15.31 15.17 15.17 15.17 15 17 . 15.51 15.51 15,31, 15.17 15.17 15.51 15.17 15.17 15.17 15.17 15.31 15.17 15.31 15.17 15.17 15.17 15.~1 15.17 ~5.17 15.17 15.31 15.17 1.5.17 15.17 15.17 15.51 15.17 15.17 15.17 15.17 15.31 15.31 15.17 15.17 15.17 15.31 15.31 !5.~7 15.17 15.17 15.31 15.17 15.51 $13 7.76 7.87 7.5~ 7.32 6.29 5.96 5.88 5.85 5.77 5.99 5.92 5,96 5.92 5.63 5.q8 5.51 5.~ 5.22 5.22 5.18 5.51 5.70 5.99 6.14 ~.29 6.52 5.99 5.4~ 5,22 5.26 5.4~ 5.66 5.44 5.~4 5.74 5.74 5.7~ 5.88 5.21 &.O~ 5.74 5.55 5.59 5.55 5.44 5.22 5,29 5.37 5.55 5.74 5.70 HLAC 6727 1.21 1.24 1.29 1.11 ~.02 0.83 0.87 0.95 0.89 0.83 0,82 0.79 0.77 28,75' 28.51 29.41 28.97 29,52 29.19 29.19 29.52 30.33 30,66 31.25! 31.95 ~O.7q 0.87 30.70 0.82 0.73 0.75 0.79 0.81 0.70 0.69 0.72 0.82 0.78 0.Tg 0.79 0.68 O.fi7 0.69 0.65 0.68 0.71 0.~9 0.79 0.70 0.8~ 0.78 0.78 0.81 O.B1 0.77 0.~1 0.85 0.98 0.90 0.94 0.85 0.81 0.70 0.78 0.85 31.21 30.18 29.41 29.96 31.10 ~1,.51 31.43 30.70 30.96 31.65 30.88 31.76 31.76 32.28 32.87 32.21 31.73 31.84 ~1.07 31.65 30.~ 31.18 31.88 31.36 31.32 31.14 31.03 29.67 28,35 27.83 28.7'1 30.15 30.63 31.65 30,96 30.29 29.30 3.59 3.59 3.~0 3,34 3,40 3.50 3.61 3.64 3.70 3.72 3.53 3.59 3.51 3.56 3.57 3.50 3.51 3.40 3.~7 3.54 3,56 3.54 3.39 3.35 3,37 3.50 3.6~ 3.67 3,66 5.~5 3.60 3.~9 3.~6 3.~0 3.42 3.62 3.62 3.67 3.70 3.81 3.73 3.81 3.97' ~.01 3.7~ ~.75 5.79 3.71 3.77 mACE 3 ARCO OIL AND SAS .... 3.S. 9-18 ' PRU[IHOK ~'!AY .... NORT~t SLOPE,ALASKA HLAC. 6727 JATA El/FRY I SAMPLES r~851 .00 109.89 15.17 5.77 1.00 .%55!.50 .106.72 15.51 5.92 1.00 ~52.00 10~+.52 15.51 5.9~ 0.99 8552.50 101.~2 15.17 5.85 0.97 ~5~.00 96.2% 15.~1 5.77 0.91 8~53.50 97.56 15.31 5.88 0.82 8~5q,00 9~.A5 15.17 5.88 0.85 855f+.50 95.60 15.51 5.99 0.91 5855.0r) 95.12 15.51 5.65 0.86 ~855.58 88.77 15.17 5.59 0.79 8~,_~ O0 8. 1..~. 17 5.55 0.86 ~85~,.~ 90.23 15.31 5.63 0.90 ~557.00 97.56 15.31 5.77 0.8q 8~57.50 97.19 15.17 5.88 585a.00 I 01.10 15.51 5.81 0.82 ~85.q. 50 99.27 15.17 5.9~ 0.gq ~a5q. O0 95.97 15.17 5.~B 0.92 ~50.50 9a.5~ 15.17 5.6~ BB60.O0 95.69 15.5~ 5.~B 0.56 ~6~.50 99.02 15.~1 5.55 ~561 .00 ~ 03.79 15.~7 5.~ G562.00 120.~ 15.~7 5.55 0.95 8~6~.50 12~. 05 15.17 5.59 0.9~ ~,~6~. ~0 129.91 15.17 5.59 0.92 8B6=,,,. 50.. 1S1,62 15,31 5,48 0,86 RB6q.50 ] 30.P,~% 15.17 5.29 0.80 8865.00 127.%7 15.17 5.29 0.88 8~&~.O0 119.68 15.51 5.51 0.87 RB6g,50 1.11,97 15,31 5.~8 0,95 8867,00 109,.99 15,17 5,29 0,81 986'7.50 112.82 15,17 5.26 0,95 g56,~. 50 125,25 15.17 5.~7 0.72 8869.8~ 12~.Z~5 15.17 5.gg 0.8g 8869.50 151.01 15.17 5.15 8870.00 118,68 15,51 5.11 ~870.50 116.85 15.51 5,07 8871 .OO ]1~.29 15.5~ 5.15 887~.50 105.01 15.17 5.26 8872.00 100.~7 15.17 5.57 8872.50 97.68 15.51 5.5~ 8~7:~, O0 88,77 15.51 5.22 8~7~,50 83,27 15,17 5,22 887~.00 79,98 ~5,~7 5, ~87~.50 78.~9 !5,~7 5. 8B75.5~ 99,76 15,~7 5, 8~7~,00 ~10,99 15,31 5, SSM3 RAT3 28.42 3.6~ 28.35 5.5~ 29.65 3.60 30.26 3.68 50.48 5.70 30,37 29.65 28.97 28.90 27.98 27.98 28.27 28.g6 29,78 28.95 28,82 28,75 27.94 27.76 27.59 28.16 27.28 27.79 29.01 29.26 29.82 29.38 28.20 28.~2 29.12 28.53 29,25 28.68 29.12 3.71 3.61 3.73 3.63 3.~8 3.56 3.69 5.52 3.71 ~,78 5.65 3.81 5.93 3,78 3.81 3.8~ 3.86 5.67 3.59 3.68 ~.5~ ~.~5 $.~9 3.51 30.07 3.51 29.82 3.99 30.55 3.~8 0.83 30.Og 0.80 30.96 3.g8 .0,77 31.1g 3.38 0.75 29.78 $.~ 0.89 30.~0 3.57 0.8~ 30.11 3.71 0.83 29.82 ~.7~ 0.85 50.37 3.75 0.78 30.88 3.78 ~0 0.70. 29.~9 3.85 29 0,7~ 29.30 5.92 53 0.76 30.15 3.9~ ~0 0.78 30.15 81 0,83 30,15 PAGE q- ARCO OIL AND $~$--,'D'S. 9.-18 _ PRtJDHOE] BAY .... NORTH SLOPE',~,LASK~ HLAC 67'27 DATA EVERY 1 SA;~PLES GR5 897&,50 ~25.6~ 15.17 8877,00 138,95 15.31 8877.50 115.1~ 15,17 5.88 8878.00 10g.91 15.17 6,88 887~.50 105.98 15.51 7.17 8879.00 9q,~5 15.5! 7.39 887~.50 9~.65 15.51 7.50 8880.00 102.08 15.51 7.17 8880.50 112.70 15,17 6,51 8~].00 ~25,57 15,51 5,96 8~81..50 ~25.~0 15.17 5.81 898~.00 12S,82 15.17 5.55 8882.50 155.9q 15,17 5.07 888~.00 1~.2! 15,31 5.11 8885.50 l~O.q~ 15.17 5.29 8~8k.00 ~.~0.82 15,51 5,22 898~.50 1~g,59 15,~1 8885.(]0 15~.2~ 15.17 5.g8 8~85.50 1:55,78 15,!7 5,37 8886.00 151.26 15,31 5,37 888~.50 15~,09 15,17 5.~ 8887.00 11~0.77 15,17 5,~ 8887.50 128.9~ 15,51 5.63 8888.00 118,56 15,31 5.q~ 8888.50 115.02 15.51 5.7g 8889.0~ 11~.61 1.5,17 5,~ 8889.50 1I~.,~B 15.~1 5,65 8890.00 107,5q 15,51 5.59 8890,50 1.08.18 15.51 88~1.0D 312.09 15,17 5,26 8591.50 ~lO.7q. 15,51 8892.00 105.q9 15,51 5.11 8892.5D 99.6~ 15,51 5.07 889~.00 99.R~ 15,17 5,11 889~.50 ~.O~..q7 15.17 ~.85 889~.90 1.06.8~ 15.17 ~.85 ~89~.50 115.92 15.51 5,22 B895.00 112.B~ 15.31 5.~ 8895.50 109,89 15,17 5,59 899g.08 ]11,8~ 15,17 5.~ 889~.50 11~.~8 15.17 5,29 88q7.00 119.5% 15,17 5.29 8897.50 ~.19.17 15,51 5.~ 889~1.00 122.~7 15,51 5.26 889R.50 150,0~ 15,51 5,26 R899.00 15&.26 15.51 5,1~ 0,86 28,86 6.51 1.06 27,85 RAT3 3.60 3.61 0.95 30.00 3.30 0.9~ 29.96 0.95 29.60 5.19 1.08 29,~1 1.lO 29.B8 3.36 1,03 29.38 0.96 30,07 3,59 0.77 31,07 0,65: ~1-21 3,67 0.65 30.15 3.73 0,73 29,63 3,70 0,7~ 28,9~ 3,79 0.8~ 29.01 3.86 0,85 28,57 3,75 0.82 _28.05 3.~ 0,85 27,61 3,51 0.91 28,6~ O,B~ .28,~9 3.~ 0.91 27.83 0.97 29.~0 3.37 0.93 29.9~ 0.88 30.11 0.88 29.93 0,80 29,08 3,~5 0.87 30,15 3,40 0,76 ~1,25 0.75 31.%5 3.!6: 0.80 32.28 3.27 0.71 32.21 3.35 0,73 31.43~ 3,50 0.70 29.93 3.29 0.81 30.63 3.25 0.80 30.18 3.30 0.76 50.~0 3.$0 0.75 30,~8 3,30 0.78 30.92- 3.22 0.73 31.56 0.61. 31.51 0.61 ~1,62 0.56 30.59 0.65 30.~8 0.76 29.56 0.78 29.~5 ~.55 0.Sq 30.~8 3.35 0.72 3O.O~ 3.27