Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-099MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:17 Township:8N Range:7E Meridian:Umiat Drilling Rig:Rig Elevation:Total Depth:11539 ft MD Lease No.:ADL0373112 Operator Rep:Suspend:P&A:X Conductor:16"O.D. Shoe@ 108 Feet Csg Cut@ Feet Surface:9 5/8"O.D. Shoe@ 3006 Feet Csg Cut@ Feet Intermediate:O.D. Shoe@ Feet Csg Cut@ Feet Production:5.5"x3.5"O.D. Shoe@ 11530 Feet Csg Cut@ Feet Liner:O.D. Shoe@ Feet Csg Cut@ Feet Tubing:3.5"O.D. Tail@ 10407 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Fullbore Bridge plug 3069 ft 2161 ft 15.8 ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 1750 1240 1160 IA 1700 1270 1190 OA 350 350 350 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: John Hansen Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Halliburton wirelline tagged cement at 2124 ft MD and drove down to 2126 ft MD. With the wireline correction of 35 ft that puts cement at 2161 ft MD. The toolstring was approximately 250 pounds with a 1.75-inch x 4-ft drive down bailer fitted with a mule shoe with a flapper valve. The bailer sample showed good cured cement. 1 bbl was pumped in to pressure up for the MIT and 0.5 bbls returned after the MIT was completed. October 16, 2025 Guy Cook Well Bore Plug & Abandonment KRU 2P-424A ConocoPhillips Alaska inc. PTD 2040090; Sundry 325-529 None Test Data: F Casing Removal: rev. 3-24-2022 2025-1016_Plug_Verification_KRU_2P-424A_gc                 C:\Users\grgluyas\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\BCJZ1PKL\2024-05-24_24014_KRU_2P-424A_CaliperSurvey_LogData_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 24014 KRU 2P-424A 50-103-20475-01 Caliper Survey w/ Log Data 24-May-25 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ _____________________________________ Date received Signature ______________________________ ______________________________________ PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 204-009 T40488 5/28/2025 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.05.28 14:31:23 -08'00' New Plugback Esets 7/26/2024 Well Name API Number PTD Number ESet Number Date CD2-09 PB1 50-103-20496-70-00 204-129 T39280 2-22-2006 CD2-10 PB1 50-103-20473-70-00 203-195 T39281 2-22-2006 CD2-28 PB1 50-103-20435-70-00 202-217 T39282 2-22-2006 CD2-40 PB1 50-103-20464-70-00 203-126 T39283 2-22-2006 CD2-43 PB1 50-103-20474-70-00 203-197 T39284 10-29-2004 Kasilof South 1 PB1 50-133-20520-70-00 202-256 T39285 5-16-2006 E-20AL1 PB1 50-029-22561-70-00 204-055 T39286 2-22-2006 F-57A PB1 50-029-22747-70-00 203-167 T39287 2-22-2006 G-18 PB1 50-029-23194-70-00 204-020 T39288 2-22-2006 H-16 PB2 50-029-23227-71-00 204-190 T39289 1-27-2005 I-17L1 PB1 50-029-23212-70-00 204-099 T39290 2-22-2006 S-01 PB1 50-029-23141-70-00 203-034 T39291 2-22-2006 S-08 PB1 50-029-23168-70-00 203-123 T39292 8-29-2003 S-18 PB1 50-029-23133-70-00 202-242 T39293 2-22-2006 06-23B PB1 50-029-20808-70-00 204-087 T39294 2-22-2006 07-14B PB1 50-029-20339-70-00 203-142 T39295 2-22-2006 15-38A PB1 50-029-22496-70-00 203-016 T39296 2-22-2006 C-16A PB1 50-029-20438-70-00 203-084 T39297 2-22-2006 D-28B PB1 50-029-21556-70-00 209-089 T39298 8-20-2012 E-01A PB1 50-029-20166-70-00 203-033 T39299 2-22-2006 K-03B PB1 50-029-21011-72-00 204-115 T39300 2-22-2006 NK-62A PB1 50-029-22852-70-00 203-047 T39301 2-22-2006 S-102L1 PB1 50-029-22972-70-00 203-156 T39302 10-26-2005 W-09A PB1 50-029-21947-70-00 204-102 T39303 2-22-2006 I-17L1 PB1 50-029-23212-70-00 204-099 T39290 2-22-2006 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q{ O!1-- CJqq Well History File Identifier Organizing (done) o Two-sided ""11/111111I11111 o Rescan Needed III 1111111111 11111I RJSCAN v1 Color Items: o Greyscale Items: DIGITAL DATA u1biskettes, No. '-I- o Other, Norrype: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: o Other: OVERSIZED (Non-Scannable) o Logs of various kinds: NOTES: Date ~ 115/D0 o Other:: BY: ~ 151 mf Project Proofing III 1111111111111111 MP BY: ~ Date q liS' J D b (~ x30= qo Date: cr jl:ç-j Db 151 Scanning Preparation BY: ~ + g- = TOTAL PAGES C/Ç? (Count does not include cover ShJt) .\/\/\ P 151 I , 1 III 1111111111111111 Production Scanning Stage 1 Page Count from Scanned File: q q (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ YES BY: ~ Date: qltSJOb Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO 151 W\ P NO BY: Maria Date: 151 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked " /111/1111I111111I 10/6/2005 Well History File Cover Page.doc • • ~_ -„~_~. MICROFILMED 03/01 /2008 DO NOT PLACE .~: . .~;:~ ~, w~ '' ~:,;;. .. ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~rPgs_InsertslMicrofilm Marker.doc 'W- DATA SUBMITTAL COMPLIANCE REPORT 9/11/2006 Permit to Drill 2040990 Well Name/No. MILNE PT UNIT SB 1-17L 1 Operator BP EXPLORATION (ALASKA) INC MD 9260/ TVD 3943 / Completion Date 8/1/2004 Completion Status 1-01L Current Status 1-01L REQUIRED INFORMATION Mud Log No Samples No -~ DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, IFRlCASANDRA, ASI, GYRO Well Log Information: Log/ Data ¥; ~ ...,,('dr ¡£ LD \ Rpt ~:t 0D Digital Med/Frmt C Lis D '''S V" D Asc D Asc D Asc D Asc Name jp~ ~ '2... J "" '-J JJ..\ '1 API No. 50-029-23212-60-00 UIC N Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint Electr Dataset Number Name 13527 Induction/Resistivity /J.71'l ]""t...c.'\.:o{~ I).. 11-f Vtl'..~·1~1: 1'.... c..: ý)'\ '" " Directional Survey Directional Survey Directional Survey Directional Survey Directional Survey Log Log Scale Media Run No Interval OH / Start Stop CH 112 9260 Open )..,7 - 'CofÞ Rpt 'fÆD D Lis Jr(p't L___ Well Cores/Samples Information: ADDITIONAL INFORM~ON Well Cored? Y ~ Chips Received? .~ Analysis ~ Received? 4984 7746 4984 7746 4984 7746 7440 9260 7440 9260 7440 9260 7440 9260 267 9204 267 9204 Directional Survey Directional Survey 12771 Gamma Ray 12771 LIS Verification Interval Start Stop Sample Set Number Comments Sent Received Daily History Received? '(DN r~/N Formation Tops Received 2/22/2006 9/312004 9/3/2004 9/3/2004 9/3/2004 9/3/2004 9/3/2004 9/3/2004 9/14/2004 9/14/2004 . Comments ROP DGR EWR plus Graphics / PS 1 ROP DGR EWR 114-7746 plus Graphics IIFR SURVEY MWD SURVEY MWD SURVEY MWD SURVEY MWD SURVEY, DEFINITIVE DEFINITIVE, MPT, GR, EWR4, ROP MPT, GR, EWR4, ROP . DATA SUBMITTAL COMPLIANCE REPORT 9/11/2006 Permit to Drill 2040990 Well Name/No. MILNE PT UNIT SB 1-17L1 Operator BP EXPLORATION (ALASKA) INC MD 9260 TVD 3943 Completion Date 8/1/2004 Completion Status 1-01L Current Status 1-01L UIC N Comments: --~~-- ~ Date: -~ Compliance Reviewed By: API No. 50-029-23212-60-00 /1 ~-(p-- . . · . WELL LOG TRANSMITTAL QO 4- Defer l!ls~7 {) 04 -.. \ 00 f 35dß To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 Febmary 16,2006 RE: MWD Formation Evaluation Logs MPI-17 Ll + Ll PB 1 + L2, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPI-17 Ll + LI PBI + L2: LAS Data & Digital Log Images: 50-029-23212-60, 70,61 1 CD Rom Q1i~{\ rf ( 9- Çy I 0 {LJ . . WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Robin Deason 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs MPI-17 Ll PBl, 1 LIS formatted Disc with verification listing. API#: 50-029-23212-70 cJtJ c(-fC9-0 # /:Z ì1¿ I September 07, 2004 AK-MW-3171003 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date ¡f(c{ RECEtVED SEP í .... 2004 .~œ&GasCons..~~ ~ BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-66112 . ~(n~ j<tJ 'f-ocrcr. . . WELL LOG TRANSMITIAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Robin Deason 333 West 7th Avenue, Suite 100 Anchorage, Aùaska 99501 September 07, 2004 RE: MWD Formation Evaluation Logs MPI-17 Ll, AK-MW-3171003 1 LIS formatted Disc with verification listing. API#: 50-029-23212-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-66112 Date: 1(.. 2. -of s~¡~ RECEIVED SEP 1 -.. 200~( Alaska Oil & Gas Cons. ~fI Anchorage ~ . STATE OF ALASKA . ALASKA~L AND GAS CONSERVATION COM~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG \ . No. of Completions 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 o GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2323' NSL, 3581' WEL, SEC. 33, T13N, R10E, UM Top of Productive Horizon: 2435' NSL, 304' WEL, SEC. 32, T13N, R10E, UM (OB) Total Depth: 3267' NSL, 4394' WEL, SEC. 32, T13N, R10E, UM (OB) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 551790 y- 6009440 Zone- ASP4 TPI: x- 549787 y- 6009537 Zone- ASP4 Total Depth: x- 545688,j y- 60103431 Zone- ASP4 18. Directional Survey 181 Yes ONo 22. CASING SIZE WT. 92# 45.5# 29.7# 12.6# 20" 10-3/4" 7-5/8" 4-1/2" H-40 L-80 L-80 L-80 34' 35' 33' 4991' 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Liner MD TVD MD TVD 5116' - 9190' 3954' - 3941' 26. Date First Production: August 20, 2004 Date of Test Hours Tested PRODUCTION FOR 8/19/2004 12 TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ........ Press. 24-HoUR RATE""" One Other 5. Date Comp., Susp., or Aband. 8/1/2004' 6. Date Spudded / 7-22-2004 7. Date T.D. Reached 7-24-2004 ' 8. KB Elevation (ft): KBE = 68.35' 1b. Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 2Q0W)99 . 13. API Number 50-029-23212-60-00 14. Well Name and Number: MPI-17L 1 15. Field / Pool(s): Milne Point Unit I Schrader Bluff 9. Plug Back Depth (MD+ TVD) 9260 + 3734 Ft 10. Total Depth (MD+TVD) .1:3' Ii 9260 + ~J~"" Ft 11. Depth where SSSV set ,.5 "þ . 0 'f 17. N/A MD 'i,1-' 19. Water depth, if offshore N/A MSL 16. Property Designation: ADL 025517 Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) / í/'J~fbW SD53 JI1þ '?í'Y7 Wò Ál> 9'.2{,6/ 21. Logs Run: MWD , GR , RES, IFRlCASANDRA , ABI , GYRO CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTINGDl'EPTlfTVØ BatroM lop BotroM 112' 34' 112' 2378' 35' 2339' 5053' 33' 3947' 9230' 3933' 3942' AMOUNT PUllED 42" 13-1/2" 9-7/8" 6-3/4" 260 sx Arctic Set (Approx.) 396 sx AS Lite, 257 sx Class 'G' 765 sx Class 'G' Uncemented Slotted Liner SIZE 2-7/8", 6.5# x 12.6#, L-80 DEPTH INTERVAL (MD) PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Electric Submersible Pump Oll-Bsl GAs-McF WATER-Bsl 1177 227 0 all -BSl 2354 27. GAs-McF 454 WATER-Bsl DEPTH SET (MD) 4738' PACKER SET (MD) AMOUNT & KIND OF MATERIAL USED I GAS-all RATIO 193 all GRAVITY-API (CORR) CHOKE SIZE CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". r¿'¡)i,:1i:¡j~i~~¡¡n ~ IBfl Sf? 2; 1. None . .... I RECEIVE· 0 1_8-:L;;'_ji ¡ )~¡FŒD .. O. D .1 ! -- . \: I¡o-. r·. __.__'" Form 1 0-407 Revised 12/2003 L CONTINUED ON REVERSE SIDE SEP 1 6 2004 ~e ^,a8-k3 Oil & Cas Cons. COJlMi~šiul Anchorage , , e GEOLOGIC MARKERS 28. NAME MD TVD SBF2-NA SBF21 SBF24-MF SBF1-NB SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB TSBB-OB TSBB-OB TSBB-OB 4410' 4429' 4468' 4486' 4545' 4569' 4581' 4591' 4616' 4744' 4844' 4943' 5069' 7394' 7471' 8865' 3735' 3743' 3757' 3764' 3785' 3794' 3798' 3802' 3811' 3855' 3888' 3920' 3950' 3950' 3950' 3937' 29. e FORMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". None 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and a Leak-Off Test Summary. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sondra ~.(.c"v-__lïtle Technical Assistant Date 09 - \ t)'- 01 MPI-17L 1 204-099 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Drilling Engineer: Skip Coyner, 564-4395 Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 O.i ,) Submit Original Only Iœ.e.;. 2-9/16" - 5M FMC Wellhead: 11" x 7-1/16" 5M" Gen 5A, w 2-7/8" FMC Tb9.~, 3" LH Acme on top and 2-7/8" EU 8rd on bottom, 2,5" CIW BPV Profile .. 20" x 34" insulated, 215 #/ft A-53 DJ:Ð 103/4" 45.5 ppl K-55 BTRC (Drift ID = 9.794, cap. = .0961 bpi) 103/4" Howco Float Shoe 12378' I ~ 75/8" 29.7 ppl, L-80, BTRC-mod casing (Drift 10 = 6,750", cap = 0,0459 bpi) (Cap w/ tbg = ,0379 bpi) 2-7/8" 6.5 ppf, L-80 8rd eue tbg. ( drift id = 2.347" cap = ,00592 bpf) KOP @ 450' 50+ degree lrom 3200' Max hole angle = 69 degrees @ +4460' Window in 75/8" Casing @ 4840' - 4852' Well Angle @ window = 70° Baker Tie Back Sleeve 4794' Baker ZXP Liner Top Packer 4805' Baker Hook Hanger LEM 4828' - 4860' Baker Hook Wall Hanger inside 7-5/8" Window 4835' Baker Hook Wall Hanger outside 7-5/8" Window 4852' Window in 7-5/8" Casing @ 5053' - 5065' Well Angle @ window = 78° Baker Tie Back Sleeve 4991' Baker ZXP Liner Top Packer 5002' Baker Hook Hanger LEM 5038' - 5073' Baker Hook Wall Hanger inside 7-5/8" Window 5048' Baker Hook Wall Hanger outside 7 -5/8" Window 5071' Baker Tie Back Sleeve 5213' Baker ZXP Liner Top Packer 5224' Baker 7-5/8" x 5" HMC Liner Hanger 5231' I ..i /~ 7-5/8" Weatherford Float Collar 5688' 7-5/8" Weatherford Float Shoe 5775' DATE 08/2/04 REV. BY Lee Hulme COMMENTS Drilled & Completed Doyon 14 MPI 17(LI/L' ~B elev. = 69.30' (Doyon 14) - Z~L. elev.= 30.40' (Doyon 14) , L C,moo 2-m" ,,. KBMM Gas lift mandrel 146' Cameo 2-7/8" x1" KBMM Gas lift mandrel 2022' .. Cameo 2-7/8" x1" KBMM Gas lift mandrel 4470' HES XN-Nipple (2.250" id) 4626' Tandem Pump, 122 stg. GC2200 GPMTAR 1:1 4679' Tandem Intake - Gas Separator Model - GRSTXBARH6 Tandem Seal Section, Series 513 GSB3 DB UT/L T IL H6 PFS AFLAS IHSN 4700' 4705' Motor, 152 KMH 2325 volt / 40 amp, 4719 ' PumpMate w/6 fin centralizer 4733' L 6 1/8" Hole td @ 9225' HES "V" Float shoe 9188' "¡"'""""J II OA Lateral 102 jts. - 4 1/2" Slotted Liner Rat Hole 12,6# L-80 IBT ('-') 37' OB Lateral rssssss' · I , , , , , , , , /1 '- 1/ / / / / / / / / I 98 jts. - 4 1/2" Slotted Liner 12.6# L-80 IBT (5116'-9190') rfoS'.ssss._, I , , , , , , , , " 6 1/8" Hole td @ 9260' Btm Baker Float Shoe 9230' ~ Rat Hole 30' ~ 1W "0" W @9253' .. ,.,<'" w- "V" ,." '"" "'" ~ 1"/////////////////////////////-1 ~ Rat Hole NB Lateral 47 jts. - 4",9.5# L-80, IBT Blanks and 20' 39 jts Baker Med Excluder Screen (6245' - 9190') 'r///////////// / / / / / / // / / / Ai'///J ~ MILNE POINT UNIT WELL 1-17jLI!L2.. API NO: 50-029-23212-00 BP EXPLORATION (AK) e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Da.te MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/10/2004 From -To 00:00 - 01 :00 1.00 MOB P PRE 01 :00 - 02:00 1.00 MOB P PRE 02:00 - 05:30 3.50 MOB P PRE 05:30 - 08:30 3.00 MOB P PRE 08:30 - 09:30 1.00 MOB P PRE 09:30 - 11 :00 1.50 MOB P PRE 11 :00 - 15:00 4.00 MOB P PRE 15:00 - 18:00 3.00 MOB P PRE 18:00 - 19:30 1.50 MOB P PRE 19:30 - 20:00 0.50 MOB P PRE 20:00 - 21 :00 1.00 MOB P PRE 21 :00 - 22:00 1.00 MOB P PRE 22:00 - 00:00 2.00 MOB P PRE 00:00 - 01 :00 1.00 MOB P PRE 7/11/2004 01 :00 - 02:00 1.00 MOB P PRE 02:00 - 03:00 1.00 MOB P PRE 03:00 - 05:00 2.00 RIGU P PRE 05:00 - 08:30 3.50 RIGU P PRE 08:30 - 17:30 9.00 DRILL P SURF 17:30 - 18:30 1.00 DRILL P SURF 18:30 - 19:30 1.00 DRILL P SURF 19:30 - 20:00 0.50 BOPSUP P SURF 20:00 - 20:30 0.50 DRILL P SURF 20:30 - 22:30 2.00 DRILL P SURF 22:30 - 00:00 1.50 DRILL P SURF 7/12/2004 00:00 - 06:00 6.00 DRILL P SURF 06:00 - 07:30 1.50 DRILL P SURF 07:30 - 19:30 12.00 DRILL P SURF 19:30 - 20:30 20:30 . 21 :30 21 :30 - 22:00 22:00 . 00:00 1.00 DRILL P 1.00 DRILL P 0.50 DRILL P 2.00 DRILL P SURF SURF SURF SURF Get floor ready to skid for move Skid rig floor from drlg position to move position Drillers side front steering rams not moving to 90 degree angle - Mechanic diagnose problem Move rig off well MPJ-25 Install back boosters Pick up matting boards and herculite around well MPJ-25 Front boosters will only tum one way - Electrican diagnose problem Move rig from J-Pad to I-Pad Remove Front boosters Finish laying rig mats Move rig on mats to other side of I-Pad Pick up double mats Lay herculite and mats for well MPI-17 Spot Rig Over Well- Accept Rig For Well Work At 00:01 hrs On 7/11/04 - Time Moved Back 3 Hours Due To Time Spent Removing Double Matting Boards - Laying Herculite And Single Matting Boards Because Of Poor Pad Conditions. Skid rig floor from move position to drlg position Rig up rig floor - Spot rock washer and berm - spot tiger tank and hook up Nipple up Divertor Install Divertor line - Mix spud mud - Load pipe shed Pick up 4" dp - Stand back in derrick - Pick up 5" HWT I Jars - Stand back in derrick Pick up BHA to rig floor - Perform Derrick Inspection Make up bit - motor - Stand HWT - Rig up HOWCO slickline for gyro runs Function Test Divertor / Knife Valve - Perform Accumulator test - Gas Monitor Test - Witness of test waived by Chuck Sheave with AOGCC Pre Spud meeting with all personnel on rig - Check mud system - Check surface lines for leaks - Fill Riser check for leaks - Spud in well - Directional Drill from 114' to 314' - WOB 20- RPM 70 - TO on 2· off 2 - GPM 395 - PP on 1250 - off 1050- PU 80 . SO 80 - ROT 80 POH - Make up MWD - Flex DC's - Orient - RIH to 314' Directional Drill from 314' to 728' - WOB 20 - RPM 70 - TO on 2 - off 2 - GPM 395 - PP on 1250 - off 1050 - PU 80 - SO 80 - ROT 80 Circ and reciprocate pipe while conference call to town on Directional Work - GPM 150 - PP 260 Directional Drill from 728' to 1972' - WOB 30 - RPM 80 - TO on 4.5 - off 2 - GPM 500 - PP on 2030 - off 1870 - PU 97 - SO 90- ROT 93 - Hydrates encountered @ 1780' to 1950' mud cut from 9.4 to 8.7+ CBU 3 X - GPM 500 - PP 1950 Pump out to HWT - From 1972' to 444' - (No Problems) RIH from 444' to 1972' - Hole good Directional Drill from 1972' to 2262' - WOB 15 to 30 - RPM 80 - TO on 5 - off 2 - GPM 500- PP on 1950- off 1980- PU 103- Printed: 81312004 9:14:56 AM e e BP Operations Summary Legal Well Name: MPI-17 Common Well Name: MPI-17 Spud Date: 7/11/2004 Event Name: DRILL+COMPLETE Start: 7/11/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 8/1/2004 Rig Name: DOYON 14 Rig Number: Date From-To Phase 7/12/2004 22:00 - 00:00 2.00 DRILL P SURF SO 92 - ROT 95 7/13/2004 00:00 - 02:30 2.50 DRILL P SURF Directional Drill From 2262' to 2388' - T.D. 13 1/2" hole - WOB 15 to 30 - RPM 80 - TO on 5 - off 3 - GPM 500 - PP 2050 on- 1780 off - PU 105 - SO 93 - ROT 96 02:30 - 04:00 1.50 DRILL P SURF CBU 3 X - GPM 500 - PP 2000 - RPM 80 - TO 2 04:00 - 06:00 2.00 DRILL P SURF Flow Check - Pump out to HWT - From 2388' to 444' @ drilling rate 500 gpm - No Problems 06:00 - 06:30 0.50 CASE P SURF Flow Check - RIH tag bridge @ 851' 06:30 - 07:00 0.50 CASE P SURF Work through bridge from 851 to 855' 07:00 - 08:00 1.00 CASE P SURF RIH from 855' to 2388' - Hit soft bridges @ 1550', 1814', and 2085' 08:00 - 10:00 2.00 CASE P SURF CBU 3 X - 80 RPM TO 2K - GPM 500 - PP 1830 10:00 - 11 :30 1.50 CASE P SURF Pump out from 2388' to HWT @ 444' - No problems 11 :30 - 13:00 1.50 CASE P SURF Lay down BHA - 13:00 - 13:30 0.50 CASE P SURF Clear rig floor 13:30 - 15:00 1.50 CASE P SURF Rig up to run 103/4" casing - PJSM 15:00 - 17:30 2.50 CASE P SURF Run 6 Joints L-80 45.5# BTC casing and 50 joints K-55 45.5" BTc casing total 56 jts 45.5# BTC 10314" ran - Bridge at 852' - Beat casing through bridge - taking weigth from 2050' to 2343' - Break circ and circulate last joint down - Pick up landing joint I casg hanger - Make up RIH from 2343' to 2378' land. 17:30 - 18:00 0.50 CASE P SURF Lay down Franks fill up tool - Make up Dowell Schlumberger cementing head - cement lines 18:00 - 20:00 2.00 CASE P SURF Circulate and condition for cement job - stage up from 3 bpm to 8 bpm @ 340 psi 20:00 - 22:00 2.00 CEMT P SURF Give to Dowell - Pump 5 bbls water - Test lines to 3500 psi - Pump 25 bbls water (one gallon dye in first 5 bbls pumped) 5 bpm @ 170 psi- Swap to rig pumps flush with 20 bbls treated water 5 bpm 170 psi - Swap to Dowell pump 20 bbls CW-100 5 bpm @ 200 psi- Pump 75 bbls Mud Push mixed at 10.3 ppg 5 bpm @ 200 psi- Drop Top plug last 5 bbls pumped Pump 313 bbls Type "ASL" yield 4.44 cflsx mixed @ 10.7 ppg 6.5 bpm @ 350 psi - Dye back after pumping 296 bbls Lead - Switch to Class "G" after 313 bbls pumped Pump 53.5 bbls Class 'G' yield 1.17 cflsx mixed @ 15.8 ppg 5.5 bpm @ 500 psi - Kick out Bottom plug with 20 bbls water with Dowell 5 bpm @ 450 psi - Give to Rig - Displace with 190 bbls mud 8 bpm @ 500 psi - Bump plug with 1500 psi 1000 psi over Hold pressure for 2 mins - Bleed off - Floats holding - 87 bbls good cement to surface Cement in place 22:00 hrs 22:00 - 23:30 1.50 CASE P SURF Rig down Cementing Head / Cementing lines - Clear rig floor - Flush Divertor - Lay down landing joint - Lay down Casing tools 23:30 - 00:00 0.50 CASE P SURF ND Divertor 7/14/2004 00:00 - 00:30 0.50 CASE P SURF Nipple Down Divertor 00:30 - 01:00 0.50 CASE P SURF Install Tubing I Casing heads - Test to 1000 psi for 10 mins 01:00 - 03:00 2.00 CASE P SURF Nipple up BOP's 03:00 - 03:30 0.50 CASE P SURF Rig up to test BOP's - Install test plug - Open annulus valve Printed: 81312004 9:14:56 AM -- e Page 3 Legal Well Name: MPI-17 Common Well Name: MPI-17 Spud Date: 7/11/2004 Event Name: DRILL+COMPLETE Start: 7/11/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 8/1/2004 Rig Name: DOYON 14 Rig Number: Date From....To Hours Task 7/14/2004 03:30 - 07:00 3.50 CASE P SURF Test BOP's - Annular 250 low 2500 high for 5 mins each test- Pipe rams - Blind rams - Choke manifold - HCR Kill/ Choke - Manual Kill/ Choke - Upper IBOP I Lower IBOP - Floor safety valves to 250 low 3500 high for 5 mis each test - Perform Accumulator test - Witness of BOP test waived by Lou Grimaldi with AOGCC. 07:00 - 07:30 0.50 CASE P SURF Pull test plug - Install wear ring - Close annulus valve 07:30 - 09:30 2.00 CASE P SURF Make up BHA - Surface test MWD 402 gpm @ 1540 psi 09:30 - 10:30 1.00 CASE P SURF RIH to 2265' - Break circulation - Rig up testing equipment 10:30 - 11 :00 0.50 CASE P SURF Test 10.75" casing to 2000 psi for 30 mins - Test good 11 :00 - 12:30 1.50 DRILL P SURF Drill float collar @ 2290' - Float shoe 2376' - Clean out to 2388' - Drill from 2388' to 2408' - Circ hole clean 12:30 - 13:00 0.50 DRILL P SURF FIT - Mud weight 9.2 ppg - surface pressure 340 psi - Pressure bleed off to 110 psi EMW = 10.2 ppg 13:00 - 13:30 0.50 DRILL P INT1 Drill from 2408' to 2438' 13:30 - 15:00 1.50 DRILL P INT1 Circulate and condition hole for FIT 15:00 - 15:30 0.50 DRILL N DPRB INT1 FIT - Mud weight 9.3 ppg - surface pressure 340 psi - Pressure bleed off to 120 psi EMW = 10.3 ppg 15:30 - 00:00 8.50 DRILL P INT1 Directional Drill from 2438' to 3416' - WOB 15 to 25 - RPM 80 - TO on 5k - off 3k - GPM 460 - PP on 2740 - off 2500 - PU 120- so 90 - ROT 106 7/15/2004 00:00 - 01 :00 1.00 DRILL P INT1 CBU 2 X - GPM 453 - PP 2440 - RPM 84 - TO 5K 01 :00 - 02:00 1.00 DRILL P INT1 Pump out to shoe - from 3416' to 2350' at drlg rate 02:00 - 03:00 1.00 DRILL P INT1 CBU 1 X - GPM 453 - PP - RPM 40 - TO 3k GPM 168 to 450- PP 600 to 1700 - Clay balls - Plugging flow line - augar line 03:00 - 03:30 0.50 DRILL N DPRB INT1 FIT - Mud weight 9.3 ppg - MD 2378' - TVD 2339' - Surface pressure 250 bled to 150 in 10 mins EMW = 10.53 - Bump up pressure from 150 to 270 psi - bled to 170 in 10 mins EMW = 10.69 03:30 - 05:00 1.50 DRILL P INT1 Cut Drtg line - Top Drive Service - Rig Service 05:00 - 05:30 0.50 DRILL P INT1 RIH From 2350' to 3416' 05:30 - 12:00 6.50 DRILL P INT1 Directional Drill from 3416' to 4183' - WOB 15 to 25 - RPM 80 - TO on 5 to 10 - off 4 - GPM 500 - PP on 2740 - off 2500 - PU 130 - SO 90 - ROT 106 - POH due to lost signal from pulsar 12:00 - 13:30 1.50 DRILL N DFAL INT1 CBU 3 X - GPM 500 - PP 2500 - RPM 80 -TO 5 13:30 - 14:30 1.00 DRILL N DFAL INT1 Pump out ot shoe from 4183' to 2370' 14:30 - 15:00 0.50 DRILL N DFAL INT1 CBU 1 X - Flow check well - Well static - Pump dry job 15:00 - 15:30 0.50 DRILL N DFAL INT1 POH to HWT from 2370' to 445' 15:30 - 18:00 2.50 DRILL N DFAL INT1 BHA stand back HWT - Flex DC's - Down load MWD Check out problem of not getting signal - Found clay and two fairty large pieces of shale on top of pulsar - change out pulsar - Install smaller screens in suction pods - Circulated across shaker screens while gunning up suction pit - Make up bit - BHA - MWD - Surface test MWD - Install 5" DP screen in 5" HWT while surface test MWD to see if any more shale I clay is captured in screen - Pull DP screen out of 5" HWT 18:00 - 20:00 2.00 DRILL N DFAL INT1 RIH from 445' to 4100' - filling pipe every 25 std - Precauctionary wash from 4100' to 4183' 20:00 - 22:00 2.00 DRILL P INT1 Direcrtional Drill from 4183' to 4375' - WOB 15 to 25 - RPM 80 - TO on 5 to 10 - off 4 - GPM 500 - PP on 2540 - off 2300 - PU 130 - SO 94 - ROT 106 22:00 - 23:30 1.50 DRILL P INT1 Circulate hole clean on top N-sands - GPM 500 - RPM 80 - PP 2300 Printed: 81312004 9:14:56 AM e e BP Operations Summary Report legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRlll+COMPlETE DOYON DRilLING INC. DOYON 14 From - To Hours Code NPT 7/15/2004 23:30 - 00:00 0.50 DRILL P 7/16/2004 00:00 - 17:00 17.00 DRILL P 17:00 - 19:00 2.00 CASE P INT1 19:00 - 20:30 1.50 CASE P INT1 20:30 - 21 :30 1.00 CASE P INT1 21 :30 - 00:00 2.50 CASE P INT1 7/17/2004 00:00 - 03:00 3.00 CASE P INT1 03:00 - 04:00 1.00 CASE P INT1 04:00 - 04:30 0.50 CASE P INT1 04:30 - 06:00 1.50 CASE P INT1 06:00 - 07:00 1.00 CASE P INT1 07:00 - 08:30 1.50 CASE P INT1 08:30 - 11 :30 3.00 CASE P INT1 11:30 -12:00 0.50 CASE P INT1 12:00 - 16:00 4.00 CASE P INT1 16:00 - 16:30 0.50 CASE P INT1 16:30 - 18:30 2.00 CASE P INT1 18:30 - 21:00 2.50 CEMT P INT1 INT1 INT1 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: Description Directional Drill from 4375' to 4445' - WOB 15 to 25 - RPM 80 - TO on 5 to 10 - off 4 - GPM 500 - PP on 2550 - off 2300 - PU 150 - SO 90 - ROT 110 - (Top NA 4414' MD) Directional Drill from 4445' to 5785' T.D. 97/8" hole - (NB top sand 4475')(OA Sand Top 4848')(OB Sand Top 5066') - WOB 15 to 25 - RPM 80 - TQ on 7 - off 5 - GPM 500 - PP on 2650 - off 2540 - PU 125 - SO 85 - ROT 100 CBU 2 X - RPM 100 - TQ 5k - GPM 460· PP 2070 Flow check - Pump out to 4100' - Pump @ drilling rate - Hole good no problems - Flow check well RIH from 4100' to 5725' - Wash from 5725' to 5785' - No Problems CBU 3 X - RPM 100 - TO 5k - GPM 500 - PP 2519 - Heavy thick mud back while circulating bottoms up - 10.2 ppg Vis 130 with lots of cuttings - Dump 40 bbls heavy mud Flow Check - Pump out to shoe from 5785' to 2360' - Pump at drlg rate - No Problems CBU 2 X - Lots cuttings - Circulate hole clean - GPM 500 - PP 1900 - RPM 60 - TQ 3k Flow check - Pump dry job - POH from 2360' to 444' Stand 1 HWT back in derrick - Lay down 9 7/8" BHA Pull wear ring - Install test plug - Change rams to 7 5/8" - Test door seal to 1500 psi Rig up 7 5/8" casing equipment Pick up and run 58 jts of 7 5/8" L-80 BTC-M 29.7# casing to shoe @ 2370' Circulate one casing volume Staging up from 2 bpm @ 250 psi to 6 bpm @ 380 psi PJSM - Con't RIH with 7 5/8" L-80 BTC-M 29.7# casing to 5739' - Total joints ran 140 plus two pup joints - Make up hanger and landing joint - RIH land casing on hanger @ 5774'- On trip in with casing break Circulation @ 3481',4502',5739'- (Shoe 5774.87' - Float collar 5688.37') Lay down Franks fill up tool - Make up Schlumberger Dowell cementing head - cementing lines Circulate two casing volumes - Condition mud for cement jOb - 6 bpm @ 350 psi - Reciprocate 15 foot strokes 1 stroke per min - PU 195 - SO 115 Give to Schlumberger Dowell - Pump 5 bbls CW-1OO 2 bpm @ 200 psi Test lines to 4000 psi Pump 20 bbls CW-1OO 3.5 bpm @ 300 psi Pump 35 bbls Mud push 3.5 bpm @ 280 psi Drop Bottom Plug Pump 158 bbls Class "G" cement mixed at ·15.8 yield 1.16 cuftlsx - 76Ósxs 6.2 bpm @ 750 psi Drop Top Plug Displace with Oil base mud - 6.4 bpm 1150 psi - Slow last 15 bbls to 2 bpm @ 825 psi - Bumped plug with 1825 psi - Pumped 262.5 bbls - Hold pressure for 5 mins - Bleed off - Floats holding - Reciprocated string while cementing and 165 bbls of displacement - String taking weight PU 220 - SO 100 - at 165 bbls displacement string taking weight down to 85 - set Printed: 8/312004 9: 14:56 AM e e page 5 of 10 Legal Well Name: MPI-17 Common Well Name: MPI-17 Spud Date: 7/11/2004 Event Name: DRILL+COMPLETE Start: 7/11/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 8/1/2004 Rig Name: DOYON 14 Rig Number: From - Tö Descriþtion.··ÓfiOpera.ìipr\5 7/17/2004 18:30 - 21 :00 2.50 CEMT P INT1 on hanger for rest of displacement 21 :00 - 21 :30 0.50 CASE P INT1 Flush Cement line with 15 bbl water - Blow back to Schlumberger - Rig down cement lines - Cementing head 21 :30 - 22:30 1.00 CASE P INT1 Lay casing / cementing equipment down beaver slide 22:30 - 23:00 0.50 CASE P INT1 Rig up to void casg of Oil base mud to 60' - Void casg - Rig down same 23:00 - 23:30 0.50 CASE P INT1 Back out landing joint - Lay down same - Change out long bails - Change out to 5' elevators 23:30 - 00:00 0.50 CASE P INT1 Pick up 1 stand 5' HWT -Install 10 314' X 7 5/8' packott as per FMC Tech - Lay down 1 stand 5' HWT 7/18/2004 00:00 - 00:30 0.50 CASE P INT1 Con't to install 1 0 3/4' X 7 5/8' packoff and test to 5000 psi for 10 mins - test good 00:30 - 01 :00 0.50 CASE P INT1 Inject 20 bbls water in outer annulus - 3 bpm @ 1050 ICP injection rate - FCP injection 900 psi 01 :00 - 02:00 1.00 CASE P INT1 Change casg rams to Drill Pipe Rams 2 7/8' X 5' - Change drill pipe saver sub on top drive 02:00 - 02:30 0.50 CASE P INT1 Test rams 2 7/8' X 5" rams to 250 low 3500 high 5 mins each test 02:30 - 03:00 0.50 CASE P INT1 Pull test plug - Install wear ring - Lay down test joint - Close annulus valves 03:00 - 05:30 2.50 CASE P INT1 Make up 6 3/4" BHA - Surface test MWD - GPM 276 @ 1960 psi 05:30 - 07:00 1.50 CASE P INT1 RIH to 5644' 07:00 - 08:00 1.00 CASE P INT1 Cut - drlg line - Top drive service 08:00 - 10:00 2.00 CASE P INT1 Test 75/8' casing to 2500 for 30 mins leaked off 100 psi 10:00 - 10:30 0.50 CASE P INT1 CBU - GPM 276 @ 2850 - RPM 40 - TO 2K 10:30 - 11 :30 1.00 CASE P INT1 Test 7 5/8" casing to 2500 for 60 mins lost 150 psi 11 :30 - 13:00 1.50 DRILL P INT1 Drill F/C @ 5688' - Shoe tract - FIS - Clean out 10' rathole from 5775' to 5785' - 20' new hole from 5785' to 5805' 13:00 - 14:00 1.00 CASE P INT1 CBU - Condition mud for FIT - GPM 300 - @ 2600 psi - RPM 40 - TO 2K 14:00 - 15:00 1.00 EVAL P INT1 Rig up testing equipment for FIT - MD 5775' - TVD 3867' - Mud weight 9.6 - Surface pressure 480 psi = EMW 12.0 ppg - Rig down testing equipment 15:00 - 00:00 9.00 DRILL P PROD1 Directional Drill from 5805' to 6749' - WOB 2 to 5 - RPM 85 - TO on 4.5k - off 2.5k - GPM 300 - PP on 3250 - off 3130 - PU 115 - SO - 80 - ROT 100 7/19/2004 00:00 - 08:30 8.50 DRILL P PROD1 Directional Drill from 6749' to 7656' - WOB 5 - RPM 80 - TO on 4.5 - off 3.5 - GPM 275 - PP on 3200 - off 3100 - PU 120 - SO 82 - ROT 103 08:30 - 10:00 1.50 DRILL P PROD1 CBU 3 X - GPM 275 - PP 2770 - RPM 80 - TO 3K - Flow check - Well static 10:00 - 12:00 2.00 DRILL P PROD1 Pump out at drlg rate from 7656' to 7276' - Back ream out from 7276' to 5741' (Shoe at 5775') 12:00 - 12:30 0.50 DRILL P PROD1 CBU - RPM 40 - TO 3K - GPM 330 - PP 3500 . Did not see any excessive cuttings on bottoms up 12:30 - 13:00 0.50 DRILL P PROD1 Rig service - Top Drive service 13:00 - 14:00 1.00 DRILL P PROD1 RIH from 5741' to 7563' - Precauctionary wash from 7563' to 7656' . Hole in good shape - No Problems 14:00 - 00:00 10.00 DRILL P PROD1 Drill From 7656' to 8617 - WOB 5 - RPM 80 - TO on 5.5 - off 4.5 - GPM 275 - PP on 3090 - off 2910 - PU 130 - SO 75- ROT 105 7120/2004 00:00 - 06:00 6.00 DRILL P PROD1 Directional Drill from 8617 to 9253' with 275 GPM, 3100 psi, Printed: 81312004 9: 14:56 AM e e BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 7/20/2004 From"; To Hours Task 00:00 - 06:00 6.00 DRILL P 06:00 - 08:00 2.00 CASE P 08:00 - 11 :00 3.00 CASE P 11:00 - 11 :30 0.50 CASE P 11 :30 - 13:30 2.00 CASE P 13:30 - 15:30 2.00 CASE P 15:30 - 16:30 1.00 CASE P 16:30 - 19:30 3.00 CASE P 19:30 - 20:00 0.50 CASE P 20:00 - 22:30 2.50 CASE P 22:30 - 00:00 1.50 CASE P 00:00 - 01 :00 1.00 CASE P 01 :00 - 06:00 5.00 CASE P 06:00 - 10:00 4.00 CASE P 10:00 - 11 :00 1.00 CASE P 7/21/2004 11 :00 - 12:00 1.00 CASE P 12:00 - 14:30 2.50 CASE P 14:30 - 15:00 0.50 CASE P 15:00 - 16:00 1.00 CASE P 16:00 - 17:30 1.50 CASE N 17:30 - 21 :00 3.50 CASE P 21 :00 - 23:00 2.00 STWHIP P 23:00 - 00:00 1.00 STWHIP P 7/22/2004 00:00 - 00:30 0.50 STWHIP P 00:30 - 03:30 3.00 STWHIP P 03:30 - 05:30 2.00 STWHIP P 05:30 - 06:00 0.50 STWHIP P 06:00 - 10:30 4.50 STWHIP P 10:30 -11:30 1.00 STWHIP P Start: Rig Release: Rig Number: Spud Date: 7/11/2004 End: 7/11/2004 8/1/2004 Description of Operation PROD1 80 RPMs, 5K bit wt. LNR1 Circ. Three bottoms up, with 100 RPMs, 315 GPM, 3900 psi LNR1 Pumping out to 7276, Back ream from 7276' to shoe 5,774, at full drilling rate. Hole in good condition. No packoff or drags. LNR1 Circ bottoms up from csg shoe 5774, with 315 Gpm 3100 psi, 50 rpms. No increase in cutting with bottoms up. LNR1 Trip to bottom 9253', wash last stand to bottom LNR1 Circ Three bottoms up with 100 rpms, 297 GPM, 3500 psi, LNR1 Displace well with Excluder screen 9.60BM LNR1 Pumping out of hole 9253 to 5775 with full drilling rate LNR1 Circ bottoms up from csg shoe 5775 with 300 GPM, 2800 psi, 40 rpms LNR1 Tripping out to BHA LNR1 Lay down 3.5 hwdp, Jars Mwd,Mud motor LNR1 Rig up to pickup 4' screen liner, PJSM LNR1 Picking up 4" screen and 4" blank liner with 4-1/2" space out tubing. Made up Baker Seal Bore Extension, Baker 7-5/S' liner hanger and ZXP liner top packer. LNR1 Run in hole slowly with screen liner on 4' drill pipe. No problems. Tagged bottom at 9253' and pick up to set liner shoe at 9232'. PU weight 130K Slack off weight 78K. LNR1 Dropped 29/32" ball and pumped down at 3 bpm at 500 psi. Ball on seat - pressure up to 2200 psi to set liner hanger. Set down 20K to ensure hanger was set. Pressured up to 3500 psi to set ZXP packer. Bled off pressure. Closed annular preventer and attempted to test ZXP packer - would not test. Pressured up on drill pipe to 4000 psi. Closed annular preventer and tested ZXP packer to 1500 psi. Rotated 12 rounds to the right and released from liner. PU weight 115K. LNR1 Displaced out new OBM out of hole with old OBM at 70 spm @ 1220 psi. LNR1 Flow check - negative. Pulled out of hole with 4" drill pipe and liner setting tool. LNR1 Clear floor, pull wear ring LNR1 Rig up and testing BOPS and manifold 250-3500 psi 5 min per test, Hydril 250-2500 psi 5 min. per test, the right to witness test was wavier by John Crisp AOGCC., #3 valve leaking on choke manifold SFAL LNR1 Repair # 3 Valve on Choke manifold LNR1 Finish testing BOPS and manifold 250-3500 psi 5 min per test, Hydril 250-2500 psi 5 min. per test, the right to witness test was wavier by John Crisp AOGCC, install wear ring PROD2 Picking up 4 3/4 de and 3.5 hwdp and stand in derrick PROD2 Slip and cut drilling line, service top drive PROD2 Finish cutting Drill line PROD2 Picking up Whipstock BHA and space out 3.5 pipe, test MWD PROD2 Tripping in with Whipstock to 5000' PROD2 Orient Whipstock 15 degrees to the right and set anchor with ~~ rY\µ-¡-\,tJOK down. Picked SK over pickup weight to assure anchor was !>et. Set down 38K and shear runnin9 bolt on whipstock. PROD2 Milled window from 5053' to 5065' with 100 RPM 270 GPM and ,; 1700 psi. Continued with mills to 5077'. PROD2 Pumped sweep and circulated 2 bottoms up 100 RPM 340 Printed: 81312004 9:14:56 AM - e BP Operations'Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: Hòurs Task 7/22/2004 10:30 - 11 :30 1.00 STWHIP P PROD2 11 :30 - 13:30 13:30 - 14:30 14:30 - 15:30 15:30 - 16:30 2.00 STWHIP P 1.00 STWHIP P 1.00 STWHIP P 1.00 STWHIP P PROD2 PROD2 PROD2 PROD2 16:30 - 18:30 2.00 STWHIP P PROD2 18:30 - 19:00 0.50 STWHIP P PROD2 19:00 - 19:30 0.50 STWHIP P PROD2 19:30 - 00:00 4.50 DRILL P PROD2 7/23/2004 00:00 - 18:30 18.50 DRILL P PROD2 18:30 - 19:00 0.50 DRILL N DPRB PROD2 19:00 - 19:30 0.50 DRILL N DPRB PROD2 19:30 - 20:00 0.50 DRILL N DPRB PROD2 20:00 - 21 :30 1.50 DRILL N DPRB PROD2 21 :30 - 00:00 2.50 DRILL P PROD2 7/24/2004 00:00 - 11 :30 11.50 DRILL P PROD2 11:30 - 13:00 1.50 DRILL P PROD2 13:00 - 15:00 2.00 DRILL P PROD2 15:00 - 16:00 1.00 DRILL P PROD2 16:00 - 16:30 0.50 DRILL P PROD2 16:30 - 19:00 2.50 DRILL P PROD2 19:00 - 23:30 4.50 CASE P PROD2 23:30 - 00:00 0.50 CASE P PROD2 7/25/2004 00:00 - 00:30 0.50 CASE P PROD2 00:30 - 02:00 1.50 CASE P PROD2 02:00 - 03:00 1.00 CASE P PROD2 03:00 - 03:30 0.50 CASE P PROD2 03:30 - 04:00 0.50 CASE P PROD2 04:00 - 05:00 1.00 CASE P PROD2 05:00 - 06:30 1.50 CASE P PROD2 GPM 2710 PSI and 4K torque. Good cutting circulated out with sweep. Monitor well - negative. Pulled out of hole with 4' drill pipe. Standing back 3.5 hwdp,and 4 3/4 DC,Laying down mills Clear floor, picked up stack flusher, flush Bop stack Picking up BHA # 6,63/4 DS146H bit wI 6- 10 jets, 4 3/4 motor with 1.5 bend,float sub,stab,Mwd,3 flex dc,jars,2 3.5 Hwdp Test MWD tool, Trip in to 4966' Service top drive Orient to 15 degrees to right of high side, Slide thru window @ 5053 to 5064 Directional Drill 5077' to 5540' with 80 rpms, 275 GPM, 2900 psi, AST .76, ART 2.34, TO 3K, P/U 115K, Slo 88K.RIT 102K Directional Drill 5540' to 7746' with 80 rpms, 275 GPM, 3000 psi, ou1 of sand @ 7746, AST 2.5, Art 7.27 Circ bottoms up þt) ~ Pumped out to 7450 .11> ns I Working lowside trought to side track well, side track well @ ~ .-t:- 7462 LI Time Drill from 7462 to 7555' J, Directional Drill 7555' to 7842' with 80 rpms, 275 GPM, 3000 ps, AST 1.54, ART 1.31, TO 3500, Plu 11 OK. S/o 80K, RIt 100K Directional Drill 7842' to 9260' with 80 rpms, 275 GPM, 3200 psi, hole taking mud slow Circ and Reciprocate, with 310 gpm 3840 psi, 80 Rpms, treating mud, lower YP Flow check, well breathing gave back 13 bbls in 10 min., pump out of well from 9260 to 7450 with 200 gpm Worked side track, orient motor to high side, attempt to slide in to side track, went into old hole,worked in to new hole, orient to high side and back ream thru side track Trip back to bottom, no problems Circ three bottoms up with 297 gpm, 3270 psi, 80 Rpms, hole not taking any mud Flow check, well breathing small stream of mud, Pumping out with 200 gpm, orient to high side @ side track and back ream side track @ 7462, small packott @ 7400, Pumping out to window, @ 5053, pull thru window with ou1 pumping, flow check @ window well static Circ bottom up @ 5030, with 297 gpm 2770 psi, 40 rpms Finish, Circ bottom up @ 5030, with 297 gpm 2770 psi, 40 rpms Tripping out to BHA Std back HWdp, Jars, flex dc, lay down MWD and Motor Clear rig floor, moblize whipstock Bha Service top drive Picking up whipstock retrival BHA, Hook, 1 jt drlg pipe,float sub, MWD,bumper sub, jars,11 dc, 15 hwdp, xo surface test MWD Trip in with whipstock hook to 5020 filling drillpipe every 25 stands .,/ Printed: 813/2004 9:14:56 AM e . BP Operations Summary Report of 10 Legal Well Name: MPI-17 Common Well Name: MPI-17 Spud Date: 7/11/2004 Event Name: DRILL+COMPLETE Start: 7/11/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 8/1/2004 Rig Name: DOYON 14 Rig Number: Hours Task Code NPT Phase I:?øscription of 7/25/2004 06:30 - 07:00 0.50 CASE P PROD2 Oreint 15 degrees to the right and latch whipstock. Pulled free with 190K (70K overpull). Observed well. Hole took fluid to BOP stack. Monitor well. Well stable. 07:00 - 07:30 0.50 CASE P PROD2 Circulated bottoms up 07:30 - 09:30 2.00 CASE P PROD2 Pulled out of hole from 5080' at controlled speed 09:30 - 11 :30 2.00 CASE P PROD2 Stand back HWDP, DCs and MWD. Laid down whipstock and seal assembly. 11 :30 - 13:00 1.50 CASE P PROD2 Clear floor, rig up to pickup 4.5 slotted liner, PJSM 13:00 - 16:30 3.50 CASE P PROD2 Pickup 98- 4.5 12.6# L-80 slotted liner and 2 -4.5 12.6# 1-80 blank jts, Baker Hook wall hanger 16:30 - 19:30 3.00 CASE P PROD2 Trip in with liner, went out window on first try, went in to 9229 with no problems,pickup wt 124k, slack off wt 87K, block wt. 50 K 19:30 - 20:00 0.50 CASE P PROD2 Hook liner after Three trys,@ 5065, shoe @ 9229' top liner 5048' 20:00 - 20:30 0.50 CASE P PROD2 Drop ball, pumped down @ 3 bbls min. 630 psi, pressure to 4250 to shear, and release liner, pull one stand to 4969' 20:30 - 22:00 1.50 CASE P PROD2 Slip and cut drilling line, service rig 22:00 - 00:00 2.00 CASE P PROD2 Tripping out with running tools, lay down same 7/26/2004 00:00 - 01 :00 1.00 CASE P PROD2 Clear rig floor, Rig up to pickup LEM tools,PJSM 01 :00 - 02:00 1.00 CASE P PROD2 Picking up Seals, 3 jts 4.512.6# L-80, Baker LEM tool and ZXP liner top packer 02:00 - 05:00 3.00 CASE P PROD2 Tripping in with LEM tool 05:00 - 06:30 1.50 CASE N DPRB PROD2 Trying to work LEM tool thru O-B hook wall hanger, going to 5078' 06:30 - 10:30 4.00 CASE N DPRB PROD2 Tripping out with LEM and lay down same, found scarring on mule shoe 10:30 - 15:30 5.00 CASE P PROD2 Pull wear ring, rig up, Test BOPS and manifold 250-3500psi 5 min. per test, Hydril 250-2500psi 5 min per test, the right to witness test was wavier by Jeff Jones AOOGC, install wear ring 15:30 - 19:00 3.50 CASE N DPRB PROD2 Waiting on New LEM tools, taking off Csg Swivel, putting bend in seal jt. 19:00 - 19:30 0.50 CASE N DPRB PROD2 Mobilize New LEM to pipe shed 19:30 - 20:30 1.00 CASE N DPRB PROD2 Pickup LEM and ZXP packer 20:30 - 23:30 3.00 CASE N DPRB PROD2 Tripping in to 5050 23:30 - 00:00 0.50 CASE P PROD2 Tag up @ 5078, pickup and turn 1/2 tum,tag same spot,pickup and turn 1/4 tum, tag same spot, pickup and turn 1/4 turn, tag same spot, pickup turn 1/4 tum went in to Latch point, Pick up wt. 11 OK, slack off 95K 7/27/2004 00:00 - 00:30 0.50 CASE P PROD2 Rig up pup jt and pump in subs, Latched in collet in O-B hook hanger, pull to 125K, slacked off with 25k on hanger, Seals @ 5246, Lem 5073 to 5037, Csg seal bore 5010, ZXP packer 4991' 00:30 - 01 :00 0.50 CASE P PROD2 Drop ball, pumped to seat with rig pump @ 3 bbls min. 650 psi, pump with First Energy and set packer with. 3500 psi, Release from LEM WIth 3800 psi 01:00 - 02:00 1.00 CASE P PROD2 Bleed drill pipe pressure to 500 psi, rig and test annulus to 2500 psi to test packer 02:00 - 03:00 1.00 CASE P PROD2 Attempt to shear ball with First Energy put 5100 psi on ball, 5 times wouldn't shear, rig down pump in sub and First Energy 03:00 - 05:30 2.50 CASE P PROD2 Tripping out wet with running tools, Laying down same 05:30 - 08:00 2.50 STWHIP P PROD3 Pickup up space out jts,whipstock,MWD,Orient same 11 dC,13 hwdp, surface test MWD Printed: 8/312004 9:14:56 AM e e Page 9 of 10 BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Phase 7/27/2004 08:00 - 10:00 2.00 STWHIP P PROD3 10:00 - 10:30 0.50 STWHIP P PROD3 10:30 - 15:30 5.00 STWHIP P PROD3 15:30 - 16:30 1.00 STWHIP P PROD3 16:30 - 18:00 1.50 STWHIP P PROD3 18:00 - 19:00 1.00 STWHIP P PROD3 19:00 - 19:30 0.50 STWHIP P PROD3 19:30 - 21 :30 2.00 STWHIP P PROD3 21 :30 - 23:00 1.50 STWHIP P PROD3 23:00 - 00:00 1.00 STWHIP P PROD3 7/28/2004 00:00 - 00:30 0.50 DRILL P PROD3 00:30 - 20:30 20.00 DRILL P PROD3 20:30 - 22:00 1.50 DRILL P PROD3 22:00 - 00:00 2.00 DRILL P PROD3 7/29/2004 00:00 - 00:30 0.50 DRILL P PROD3 00:30 - 01:00 0.50 DRILL P PROD3 01 :00 - 02:00 1.00 DRILL P PROD3 02:00 - 22:30 20.50 DRILL P PROD3 22:30 - 00:00 1.50 CASE P PROD3 7/30/2004 00:00 - 01 :00 1.00 CASE P PROD3 01 :00 - 04:30 3.50 CASE P PROD3 04:30 - 05:30 1.00 CASE P PROD3 05:30 - 07:00 1.50 CASE P PROD3 07:00 - 09:00 2.00 CASE P PROD3 09:00 - 10:00 1.00 CASE P PROD3 10:00 - 11:00 1.00 CASE P PROD3 11:00 - 12:00 1.00 CASE P PROD3 12:00 - 12:30 0.50 CASE P PROD3 12:30 - 16:00 3.50 CASE P PROD3 16:00 - 17:00 1.00 CASE P PROD3 17:00 - 21 :00 4.00 CASE P PROD3 21:00 - 00:00 3.00 CASE P PROD3 7/31/2004 00:00 - 01 :30 1.50 CASE P PROD3 Spud Date: 7/11/2004 End: Trip in with whipstock Orient 17 degree to left of high side, set whipstock trip anchor w/22K, shear off 35K Mill window with 3-5K 65-100 rpms, 300 gpm, 2100 psi, Top of window 4840', Bottom window 4852', Drill to 4866' Pump sweep, Circ 1.5 bottoms up, work window Trip out to BHA Stand back DC and Hwdp, Lay down mills, mills full gauge Pickup Johnny Wacker, flush BOP stack Clear floor, Pick up BHA #9 6 3/4 Bit with 6X10s, 5" sperry drii w/1.5 bend,float sub,stab,4 3/4 HCIM/RES/GR,4 3/4 DM,4 3/4 TM, 3 flex dc,jars,2 hwdp Tripping in to 4774 Slip and cut drilling line, service top drive Orient and slide thru window Drilling 4856' to 6979' with 280 gpm, 2900 psi, 90 rpms, 3-10K bit wt., PIU wt 120K, Slo 85K, RIt 100K, TQ 4K, Control drill, max 200 ft. per hr., AST 3.39, ART 8.53 Circ, three bottoms up, with 280 gpm, 2800 psi, 90 rpms Pumping out to window @ 4869' with full drilling rate, pull thru window @ 4840-4852 with out pumping, pull to 4473, with out problems Circ bottoms up @ 4773 Service top drive Trip to bottom, wash last stand to bottom Drilling 6979' to 9225' with 280 gpm, 3200 psi, 90 rpms, 3-10K bit wt., Control drill, max 200 ft. per hr, Drilled out of the top of the OA sand at 9155', At 8700', the hole started taking mud 5- 8 bbls hr. Circ, three bottoms up with, 280 gpm, 3000 psi, 100 rpms Finish Circ three bottoms up with, 280 gpm, 3000 psi, 100 rpms Pumping out to Window @ 4840-4852 with full drilling rate, pull thru window with out pumping, no problems Monitor well, Circ bottoms up, @ 4735 POH Stand back BHA, Download MWD Pickup whipstock Hook and mwd BHA, orient same, surface test MWD Rih with whipstock hook to 4780 Orient Hook and latch on to whipstock, pulled free Circ bottoms up 250gpm, 1700 psi Tripping out with whipstock, lay down same Clean floor, rig up to run slotted Iiner,PJSM Picking up 4.5 Slotted liner, 102Jts, 4.5, 12.6#, L-80, Slotted, 2 jts 4.512.6# L-80 Blanks jts, baker hook wall hanger, P/U wt. 97K, SIO 85K Tripping in with liner, went thru window on first try,P/U 130K, Slo 80K, hooked window on on fourth try, Shoe 9188', top of hook wall hanger 4835' Pumped ball down 3 bbls min. pressure up, release from liner, pressure to 4,000 with rig pump couldn't shear ball, pull one stand rigged up test pump, shear ball with 4500 psi, P/U wt Printed: 81312004 9:14:56 AM e e 10 BP Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 7/31/2004 8/112004 MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: From - To NPT Phase 00:00 - 01 :30 1.50 CASE P PROD3 115K 01 :30 - 03:30 2.00 CASE P PROD3 POH with running tools, lay down same 03:30 - 04:00 0.50 CASE P PROD3 Rig up to pickup LEM, PJSM 04:00 - 05:00 1.00 CASE P PROD3 Picking up LEM, Seal jt., 3 jts 4.5 12.6# L-80 tubing, LEM, CSG swivel,ZXP packer 05:00 - 07:30 2.50 CASE P PROD3 RIH with LEM, Landed on Hgr. 4835, seals @ 5024 07:30 - 08:00 0.50 CASE P PROD3 Drop ball, pump to seat @ 3 bbls min., 550 psi,pressure up to 2800psi for pusher tool, 3200 psi to set ZXP packer 08:00 - 09:00 1.00 CASE P PROD3 RIU First Engergy, shear ball with 5200 psi 09:00 - 11 :30 2.50 CASE P PROD3 Poh, lay down running tools 11 :30 - 13:00 1.50 CASE P PROD3 Pick up Johnny Wacker, Trip in to 4762' 13:00 - 15:00 2.00 CASE P PROD3 Displace well with 40 bbls L VT, 25 bbls HiV spacer, 40 bbls Safesurf, 25 bbls HIV spacer,9.6 brine inhibiter treated 15:00 - 16:00 1.00 CASE P PROD3 Slip and cut drill line 16:00 - 23:30 7.50 CASE P PROD3 Laying down drill pipe 23:30 - 00:00 0.50 CASE P PROD3 Clear rig floor, pull wear ring 00:00 - 01 :00 1.00 RUNCOMP RUNCMP Change saver sub on topdrive 01 :00 - 03:00 2.00 RUNCOMP RUNCMP Moblize tubing to pipe shed, rig up to run tubing, PJSM, (waiting on ESP sheave, oil for motor) 03:00 - 08:00 5.00 RUNCOMP RUNCMP Picking up ESP assy, fill with oil, found broken wire on the end of motor, Repair same 08:00 - 14:00 6.00 RUNCOMP RUNCMP Picking up 2 7/8 1-80 1ST tbg., check conductivity and circ ever 1500', pickup total 144 jts, 14:00 - 16:30 2.50 RUNCOMP RUNCMP make up to hanger, PIU 82K,S/O 72, 82 lesalle clamps run 16:30 - 17:00 0.50 RUNCOMP RUNCMP Land tubing with TWC in place, test !we to 1000 psi,End of pump 4736, Top of pump 4678,XN 4626,GLM 4470,GLM 2022, GLM 145 17:00 - 18:00 1.00 RUNCOMP RUNCMP Nipple down SOPS, 18:00 - 21:00 3.00 RUNCOMP RUNCMP Nipple up 11' x 2 9/16 ESP adapter flange (had to change out dummy Penetrator) and CIW 2 9/16 5K tree, test both to 5000 psi, 21 :00 - 22:00 1.00 RUNCOMP RUNCMP Pull TWC and Set CIW 2 1/2 type H SPV, pump out cellar, secure well, Rig release for rig move @ 2200 hI's 8/1/2004 Printed: 81312004 9:14:56 AM Surface Pre$sure Leak Off Pressure (BHP) EMW 120 (psi 1,250 (psi) 10.29 (ppg) 170 (psi 1,300 (psi 10.70 (ppg) 480 (psi 2,408 (psi 11.99 (ppg) e e Printed: 8/3/2004 9:14:42 AM AMW 9.30 (ppg) 9.30 (ppg) 9.60 (ppg) "testDeþth(TMD) Test Depth (TVD) 2,378.0 (ft) 2,339.0 (ft) 2,378.0 (ft) 2,339.0 (ft) 5,774.0 (ft) 3,867.0 (ft) Legal Name: MPI-17 Common Name: MPI-17 TeltOatê Test Type 7/14/2004 FIT 7/1512004 FIT 7/18/2004 FIT AOGCC e RECEIVED SEP 0 3 2004 Alaska Oil & Gas Cons. Commiaeb1 Anchorage e 17 -Aug-04 LRUUi'l DE:ä::ïul' - 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPI-17 L 1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 7,440.63' MD 5,053.00 I MD 9,260.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 9518 ) ì Date f:k 0 ¡ Sig ed ~ . áJ~ Please C£I ~e at 273-3545 if you have any q stions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~ tJ i",~'r;f t ) ( '((1¡:' ..- · DEFINITIVE Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPI MPI-17 L 1 e Job No. AKZZ3171003, Surveyed: 24 July, 2004 Survey Report 17 August, 2004 Your Ref: API 500292321260 Surface Coordinates: 6009439.29 N, 551789.57 E (70026'11.5176" N, 149034' 39.9045" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1009439.29 N, 51789.57 E (Grid) Surface Coordinates relative to Structure Reference: 350.50 S, 388.52 W (True) Kelly Bushing Elevation: 68.35ft above Mean Sea Level Kelly Bushing Elevation: 68.35ft above Project V Reference Kelly Bushing Elevation: 68.35ft above Structure Reference SpE!i'i'Y-SUI'1 DRfL..L-tNG seAVfc:eS A Halliburton Company Survey Ref: svy1439 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17 L 1 Your Ref: API 500292321260 Job No. AKZZ3171003, Surveyed: 24 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 7440.63 89.630 278.700 3881,82 3950.17 635.91 N 4304.98 W 6010045.29 N 547480.28 E 4351.57 Tie On Point v 7462.00 91.030 279.290 3881.69 3950.04 ~ 639.25 N 4326.09 W 6010048.48 N 547459.15 E 7.109 4372.94 Window Point 7483.50 86.730 278.080 3882,11 3950.46 642.50 N 4347.33 W 6010051.58 N 547437.88 E 20.776 4394.43 7532.60 85.790 277.340 3885.32 3953.67 649.07 N 4395.88 W 6010057.82 N 547389.28 E 2.435 4443.42 7579.45 87.710 277.500 3887,97 3956.32 655.11 N 4442.26 W 6010063.54 N 547342.86 E 4.112 4490.18 7630.49 87.160 277,210 3890.26 3958.61 661.64 N 4492.83 W 6010069.71 N 547292.25 E 1.218 4541 .15 e 7676.42 86.540 276.660 3892.78 3961.13 667.17 N 4538.36 W 6010074.93 N 547246.69 E 1.803 4586.98 7724.29 87.220 276.020 3895.39 3963.74 672.45 N 4585.86 W 6010079.88 N 547199.15 E 1.949 4634.74 7772.29 90.310 278.450 3896.42 3964.77 678.50 N 4633.46 W 6010085.59 N 547151.51 E 8.189 4682.70 7816.34 90.060 278.520 3896.28 3964.63 685.00 N 4677.03 W 6010091.79 N 547107.90 E 0,589 4726.75 7869.87 90.990 279.200 3895.79 3964.14 693.24 N 4729.92 W 6010099.67 N 547054.95 E 2.152 4780.27 7918.02 89.810 277.210 3895.45 3963.80 700.11 N 4777.57 W 6010106.21 N 547007.25 E 4.805 4828.42 7965.46 90.930 276.530 3895.15 3963.50 705.79 N 4824.67 W 6010111.56 N 546960.12 E 2.762 4875.83 8015.85 90.490 276.180 3894.52 3962.87 711.36 N 4874.74 W 6010116.78N 546910.00 E 1.116 4926.17 8061.83 90.000 276.130 3894.32 3962.67 716.29 N 4920.46 W 6010121.40 N 546864.26 E 1.071 4972.10 8112.24 89,630 275.500 3894.49 3962.84 721.40 N 4970.61 W 6010126.16 N 546814.07 E 1 .449 5022.43 8157.54 90.250 278.200 3894.53 3962.88 726.80 N 5015.58 W 6010131.25 N 546769.06 E 6.115 5067.70 8207,37 90.000 278.870 3894.43 3962.78 734.20 N 5064.86 W 6010138.30 N 546719.74 E 1 .435 5117.53 8253.92 91.110 282.150 3893.97 3962.32 742.69 N 5110.62 W 6010146.47 N 546673.92 E 7.438 5164.05 8303.13 91.360 282.740 3892.91 3961.26 753.29 N 5158.66 W 6010156.74 N 546625.80 E 1.302 5213.15 8350,11 91.540 282.610 3891.73 3960.08 763.59 N 5204.48 W 6010166.73 N 546579.91 E 0.473 5260.01 8399.32 91.360 282.810 3890.48 3958.83 774.42 N 5252.47 W 6010177.22 N 546531.85 E 0.547 5309.09 e 8445.01 91.050 282.350 3889.52 3957.87 784.37 N 5297.05 W 6010186.85 N 546487.20 E 1.214 5354.68 8497,66 91.110 282.320 3888.53 3956.88 795.61 N 5348.48 W 6010197.74 N 546435.70 E 0.127 5407.22 8540.44 90.990 281.850 3887.74 3956.09 804.57 N 5390.30 W 6010206.41 N 546393.81 E 1.134 5449.92 8592.29 92.350 282.200 3886.23 3954.58 815.36 N 5440.99 W 6010216.85 N 546343.05 E 2.708 5501.67 8636.66 95.570 282.500 3883.17 3951.52 824.83 N 5484.23 W 6010226.02 N 546299.75 E 7.288 5545.84 8688.11 95.320 282.430 3878.29 3946.64 835.89 N 5534.24 W 6010236.72 N 546249.66 E 0.504 5596.96 8732.21 93.590 283.070 3874.86 3943.21 845.59 N 5577.12 W 6010246.13 N 546206.71 E 4.181 5640.82 8781.43 93.270 282.510 3871.92 3940.27 856.47 N 5625.03 W 6010256.67 N 546158.73 E 1.309 5689.83 8828.30 91.360 282,310 3870.02 3938.37 866.53 N 5670.77 W 6010266.42 N 546112.92 E 4.097 5736.57 8878.61 90.430 281.550 3869.24 3937.59 876.93 N 5719.98 W 6010276.48 N 546063.64 E 2.387 5786.80 8924.37 89.630 281.420 3869,21 3937.56 886.04 N 5764.83 W 6010285.28 N 546018.73 E 1.771 5832.51 8975.74 89.320 281.050 3869,68 3938.03 896.05 N 5815.21 W 6010294.93 N 545968.28 E 0.940 5883.83 9019.08 89.380 280.820 3870.18 3938.53 904.27 N 5857.76 W 6010302.86 N 545925.67 E 0.548 5927.14 17 August, 2004 - 10:09 Page 2 of 4 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17 L 1 Your Ref: API 500292321260 Job No. AKZZ3171003, Surveyed: 24 July, 2004 Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 9069.37 89.260 280.070 3870.77 3939.12 913.38 N 5907.21 W 6010311.63N 545876.16 E 9116.84 89.010 280.070 3871.49 3939.84 921.68 N 5953.95 W 6010319.61 N 545829.37 E 9189.98 88.640 279.820 3872.99 3941.34 934.31 N 6025.97 W 6010331,73 N 545757.26 E 9260.00 88.640 279.820 3874.65 3943.00 r/ 946.25 N 6094.95 W ,.-ß01 0343.19 N 545688.20 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.830° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9260.0Oft., The Bottom Hole Displacement is 6167.96ft., in the Direction of 278.825° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 7440.63 7462.00 9260.00 635.91 N 639.25 N 946.25 N 4304.98 W 4326.09 W 6094,95 W Tie On Point Window Point Projected Survey 3950.17 3950.04 3943.00 17 August, 2004 - 10:09 Page 3 of 4 Dogleg Rate (0/100ft) 1.510 0.527 0.610 0.000 BPXA Vertical Section Comment 5977.41 6024.86 6097.97 6167.96 Projected Survey e e DrillQuest 3.03.06.006 ,'. Milne Point Unit Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17 L 1 Your Ref: API 500292321260 Job No. AKZZ3171003, Surveyed: 24 July, 2004 BPXA Survey tool program for MPI-17 L 1 From Measured Vertical Depth Depth (ft) (ft) 0.00 450.00 0.00 449.96 17 August, 2004· 10:09 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 450.00 9260.00 449.96 Tolerable Gyro - CB-SS-Gyro (MPI-17) 3943.00 AK-6 BP _IFR-AK - MWD-IIFR-MS (MPI-17) e e Page 4 of4 DrillQuest 3.03.06.006 AOGCC )Ilobin Deason 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 e RECE\VED SEP 0 ~) 2004 .AiêikêOl\&GasCons. comøiiDP . ..Mçh0T8g8 _ ~';-'ÎUJ ~¥, ß f'- Jf ç,~ 17 -Aug-04 Re: Distribution of Survey Data for Well MPI-17 L 1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 7,440.63' MD 5,053.00 I MD 9,260.00 I MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date 1)14 S ,/¡L Please call me at 273-3545 if you have any estions or concerns. Regards, William T. Allen Survey Manager Attachment(s) Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPI MPI-17L 1 MWD e Job No. AKMW3171003, Surveyed: 24 July, 2004 Survey Report 17 August, 2004 Your Ref: API 500292321260 Surface Coordinates: 6009439.29 N, 551789.57 E (70026' 11.5176" N, 149034' 39.9045" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1009439.29 N, 51789.57 E (Grid) Surface Coordinates relative to Structure Reference: 350.50 S, 388.52 W (True) Kelly Bushing Elevation: 68.35ft above Mean Sea Level Kelly Bushing Elevation: 68.35ft above Project V Reference Kelly Bushing Elevation: 68.35ft above Structure Reference spal"""l"""y-sUil DRILLING SERViCes A Halliburton Company Survey Ref: svy1450 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L 1 MWD Your Ref: API 500292321260 Job No. AKMW3171003, Surveyed: 24 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 7440.63 89.630 278.830 3881.84 3950.19 649.98 N 4298.07 W 6010059.41 N 547487.09 E 4346.91 Tie On Point 7462.00 91,030 279.290 3881.71 3950.06 653.35 N 4319.18 W 6010062.63 N 547465.96 E 6.896 4368.28 Window Point 7483.50 86,730 278.360 3882.13 3950.48 656.65 N 4340.41 W 6010065,78 N 547444.70 E 20.462 4389.77 7532.60 85.790 277.810 3885.34 3953.69 663.54 N 4388.92 W 6010072.33 N 547396,15 E 2.217 4438,76 7579.45 87.710 277.900 3887.99 3956.34 669.93 N 4435.25 W 6010078.40 N 547349.77 E 4.103 4485.52 e 7630.49 87.160 277.290 3890.28 3958.63 676.67 N 4485.79 W 6010084.79 N 547299.19 E 1.608 4536.50 7676.42 86.540 276.520 3892.80 3961.15 682.18 N 4531.32 W 6010089.99 N 547253.62 E 2.150 4582.33 7724.29 87.220 275.990 3895.41 3963.76 687.39 N 4578.84 W 6010094.87 N 547206.07 E 1.800 4630.08 7772.29 90.310 278.650 3896.44 3964.79 693.50 N 4626.42 W 6010100.65 N 547158.44 E 8.493 4678.05 7816.34 90.060 278.470 3896.30 3964.65 700.06 N 4669.98 W 6010106.90 N 547114.84 E 0.699 4722.10 7869.87 90.990 279.430 3895.81 3964.16 708.39 N 4722.86 W 6010114.86 N 547061.91 E 2.497 4775.62 7918.02 89.810 277.360 3895.47 3963.82 715.42 N 4770.49 W 6010121.56 N 547014.23 E 4.948 4823.77 7965.46 90.930 276.710 3895.17 3963.52 721.23 N 4817.57 W 6010127.04 N 546967.11 E 2.730 4871.18 8015.85 90.490 275.930 3894.54 3962.89 726.77 N 4867.65 W 6010132.24 N 546916.99 E 1.777 4921.52 8061.83 90.000 276.530 3894.35 3962.70 731.76 N 4913.35 W 6010136.91 N 546871.25 E 1.685 4967.45 8112.24 89.630 275.990 3894.51 3962.86 737.26 N 4963.46 W 6010142.06 N 546821.11 E 1.299 5017.81 8157.54 90,250 278.610 3894.56 3962.91 743.01 N 5008.39 W 6010147.51 N 546776.14 E 5.943 5063.09 8207.37 90.000 279.360 3894.45 3962.80 750.80 N 5057.61 W 6010154.95 N 546726.87 E 1.587 5112.92 8253,92 91.110 282.660 3894.00 3962.35 759.68 N 5103.29 W 6010163.52 N 546681.12 E 7.479 5159.42 8303.13 91.360 282,830 3892.94 3961.29 770.54 N 5151.28 W 6010174.04 N 546633.06 E 0.614 5208.51 8350.11 91.540 282.500 3891.75 3960.10 780,83 N 5197.10 W 6010184.02 N 546587.17 E 0.800 5255.37 8399.32 91.360 283.340 3890.50 3958.85 791.83 N 5245.05 W 6010194.68 N 546539.15 E 1.745 5304.44 e 8445.01 91.050 283.120 3889.54 3957.89 802.29 N 5289.52 W 6010204.83 N 546494.61 E 0.832 5349.98 8497.66 91.110 282.640 3888.55 3956.90 814.02 N 5340.83 W 6010216.21 N 546443.21 E 0.919 5402.49 8540.44 90.990 282.310 3887.76 3956.11 823.26 N 5382.60 W 6010225.15 N 546401.39 E 0.821 5445.18 8592,29 92.350 281.720 3886.25 3954.60 834.05 N 5433.29 W 6010235.59 N 546350.62 E 2.859 5496.92 8636.66 95.570 283.160 3883.19 3951.54 843.58 N 5476.51 W 6010244.82 N 546307.34 E 7.946 5541.09 8688.11 95.320 282.650 3878.31 3946.66 855.02 N 5526.43 W 6010255.92 N 546257.34 E 1.100 5592.18 8732.21 93.590 283.330 3874,88 3943.23 864.90 N 5569.27 W 6010265.50 N 546214.43 E 4.213 5636.03 8781.43 93,270 281.620 3871.94 3940.29 875.52 N 5617.24 W 6010275.78 N 546166.39 E 3.528 5685.06 8828.30 91.360 281.940 3870.04 3938.39 885.08 N 5663.08 W 6010285.02 N 546120.48 E 4.132 5731.83 8878.61 90.430 280.260 3869.26 3937.61 894.76 N 5712.44 W 6010294.36 N 546071.05 E 3.816 5782.09 8924.37 89.630 281.100 3869.23 3937.58 903.24 N 5757.41 W 6010302.53 N 546026.03 E 2.535 5827.83 8975.74 89.320 280.860 3869.70 3938.05 913.03 N 5807.84 W 6010311.96 N 545975.53 E 0.763 5879.16 9019.08 89.380 280.300 3870.20 3938.55 920.98 N 5850.44 W 6010319.62 N 545932.88 E 1.299 5922.47 17 August, 2004 - 10:16 Page 2 of 4 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L 1 MWD Your Ref: API 500292321260 Job No. AKMW3171003, Surveyed: 24 July, 2004 Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 9069.37 89.260 280.070 3870.79 3939.14 929.88 N 5899.93 W 6010328.17 N 545883.32 E 9116.84 89.010 279.460 3871.51 3939.86 937.93 N 5946.71 W 6010335.90 N 545836.49 E 9189,98 88.640 279.350 3873.01 3941.36 949.87 N 6018.85 W 6010347.35 N 545764.27 E .../9260.00 88.640 279,350 3874.67 3943.02 - 961.25 N 6087.92 W 6010358.24 N 545695.12 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.830° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9260.00ft., The Bottom Hole Displacement is 6163.34ft., in the Direction of 278.973° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 7440.63 7462.00 9260.00 3950.19 3950.06 3943.02 649.98 N 653.35 N 961.25 N 4298.07 W 4319.18 W 6087.92 W Tie On Point Window Point Projected Survey 17 August, 2004 - 10:16 Page 3 0'4 Dogleg Rate (0/100ft) 0.516 1.389 0.528 0.000 BPXA Vertical Section Comment 5972.75 6020.20 6093.32 6163.32 Projected Survey e e DrillQuest 3.03.06.006 Milne Point Unit Halliburton Sperry-Sun Survey Report for Milne Point MPI - MPI-17L 1 MWD Your Ref: API 500292321260 Job No. AKMW3171003, Surveyed: 24 July, 2004 BPXA Survey tool program for MPI-17L 1 MWD From Measured Vertical Depth Depth (ft) (ft) 0.00 450.00 0.00 449.96 17 August, 2004 - 10:16 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 450.00 9260.00 e 449.96 Tolerable Gyro - CB-SS-Gyro (MPI-17 MWD) 3943.02 MWD Magnetic (MPI-17 MWD) e Page 4 of 4 DrillQuest 3.03.06.006 , RECEIVED c;¡:p ("I -; 0004 VL.. U ,) "- Alaska Oil & Gas Cons. COIIU1IiIIbt And1or8ge e ~tJ tf- () { cr ~/l (,'f7 - .,... 17 -Aug-04 AOGCC -Ro'ðilJ Dc-asoll 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPI-17 L 1 PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 4,984.60 I MD 5,053.00' MD 7,746.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. í Anchorage, AK 99518 ~ ;:::e~t~73-3545 i:~:::ave a:fd~~. Regards, William T. Allen Survey Manager Attachment(s) DEFINITIV Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPI MPI-17 L1PB1 e Job No. AKZZ3171003, Surveyed: 23 July, 2004 Survey Report 13 August, 2004 Your Ref: API 500292321270 Surface Coordinates: 6009439.29 N, 551789.57 E (70026'11.5176- N, 149034' 39.9045- W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1009439.29 N, 51789.57 E (Grid) Surface Coordinates relative to Structure Reference: 350.50 S, 388.52 W (True) Kelly Bushing Elevation: 68.35ft above Mean Sea Level Kelly Bushing Elevation: 68.35ft above Project V Reference Kelly Bushing Elevation: 68.35ft above Structure Reference !5pei'i'Y-!5Urt º f't..t L L t N G ,5 e: R.V I c: e: 5 A Halliburton Company Survey Ref: svy1438 ·f ~ Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17 L 1PB1 Your Ref: API 500292321270 Job No. AKZZ3171003, Surveyed: 23 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 4984.60 75.470 285.100 3863.10 3931.45 89.47 N 1923.64 W 6009515.40 N 549865.36 E 1914.57 Tie On Point 5053.00 78.250 284.960 3878.65 3947.00 106.74 N 1987.96 W 6009532.23 N 549800.92 E 4.069 1980.78 Window Point 5086,30 83.870 287.920 3883.82 3952.17 116.05 N 2019.49 W 6009541.32 N 549769.32 E 19.023 2013.37 5135.81 90.490 292.000 3886.26 3954.61 132.93 N 2065.93 W 6009557.87 N 549722.76 E 15.699 2061.85 5181.84 90.190 292.250 3885.99 3954.34 150.26 N 2108.57 W 6009574.91 N 549680.00 E 0.848 2106.65 e 5231.55 89.940 292.520 3885.93 3954.28 169.19 N 2154.54 W 6009593.52 N 549633.91 E 0.740 2154.98 5278.00 89.690 292.780 3886.08 3954.43 187.08 N 2197.41 W 6009611.11 N 549590.92 E 0.777 2200.08 5326.51 88.640 292.840 3886.79 3955.14 205.89 N 2242.12 W 6009629.60 N 549546.08 E 2.168 2247.15 5374.43 88.020 290.460 3888.18 3956.53 223.56 N 2286.63 W 6009646.96 N 549501.44 E 5.130 2293.85 5423.63 86.910 292.320 3890.36 3958.71 241.48 N 2332.40 W 6009664.57 N 549455.55 E 4.399 2341.82 5470.22 90,120 291.910 3891.57 3959.92 259.01 N 2375.54 W 6009681.80 N 549412.29 E 6.946 2387.14 5506.39 90.740 291.960 3891.30 3959.65 272.52 N 2409.09 W 6009695.08 N 549378.65 E 1.720 2422.37 5535.29 90.620 291.950 3890.95 3959.30 283.33 N 2435.89 W 6009705.70 N 549351.77 E 0.417 2450.51 5566.19 90.740 291,110 3890.59 3958.94 294.67 N 2464.63 W 6009716.83 N 549322.95 E 2.746 2480.66 5615.50 90.930 291.520 3889.87 3958.22 312.59 N 2510.57 W 6009734.44 N 549276.89 E 0.916 2528.79 5662.57 92.160 288.280 3888.60 3956.95 328.60 N 2554.80 W 6009750.14 N 549232.55 E 7.360 2574.96 5714.00 91.660 285.760 3886.88 3955.23 343.65 N 2603.95 W 6009764.85 N 549183.30 E 4.993 2625.84 5759.66 90.620 284.190 3885.97 3954.32 355.44 N 2648.05 W 6009776.34 N 549139.12 E 4.124 2671.22 5803.49 90.990 281.200 3885.36 3953.71 365.07 N 2690.80 W 6009785.67 N 549096.30 E 6.873 2714.95 5854.90 90,740 280.640 3884.58 3952.93 374.81 N 2741.27 W 6009795.06 N 549045.76 E 1.193 2766.32 5899.76 90.490 279.880 3884.10 3952.45 382.80 N 2785.41 W 6009802.74 N 549001.57 E 1.783 2811.16 5951.33 91.730 280.000 3883.10 3951.45 391.70 N 2836.19 W 6009811.29 N 548950.72 E 2.416 2862.71 e 5995.42 91.230 279.710 3881.96 3950.31 399.24 N 2879.62 W 6009818.53 N 548907.25 E 1.311 2906.78 6047.26 90.680 279.120 3881.10 3949.45 407.72 N 2930.75 W 6009826.65 N 548856.06 E 1.556 2958.61 6092.98 90.060 278.390 3880.80 3949.15 414.68 N 2975.94 W 6009833.30 N 548810.82 E 2.095 3004.32 6144.01 89.510 277.890 3881.00 3949.35 421.91 N 3026.45 W 6009840.17 N 548760.26 E 1.457 3055.35 6190.01 89.140 277.620 3881.54 3949.89 428.11 N 3072.03 W 6009846.06 N 548714.64 E 0.996 3101.34 6239.92 89.070 277.150 3882.32 3950.67 434.53 N 3121.52W 6009852.13 N 548665.11 E 0.952 3151.23 6285.70 89.630 278.700 3882.84 3951.19 440.84 N 3166.86 W 6009858.13 N 548619.73 E 3.600 3197.00 6335.76 90.250 280.170 3882.89 3951.24 449.04 N 3216.24 W 6009865.99 N 548570.29 E 3.187 3247.05 6386.57 90.250 279.830 3882.67 3951.02 457.87 N 3266.28 W 6009874.47 N 548520.19 E 0.669 3297.85 6432.26 89.510 280.050 3882.76 3951.11 465.75 N 3311.28 W 6009882.04 N 548475.13 E 1.690 3343.53 6482.37 88.950 279.950 3883.44 3951.79 474.46 N 3360.63 W 6009890.40 N 548425.73 E 1.135 3393.63 6527.50 88.580 279.670 3884.41 3952.76 482.14 N 3405.08 W 6009897.78 N 548381.22 E 1.028 3438.74 6578.15 87.900 279.150 3885.96 3954.31 490.42 N 3455.03 W 6009905.71 N 548331.22 E 1.690 3489.36 13 August, 2004 - 8:18 Page 2 of 4 DrillQuest 3.03.06.006 ~ Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17 L 1PB1 Your Ref: API 500292321270 Job No. AKZZ3171003, Surveyed: 23 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 6623.45 88.330 278.520 3887.45 3955.80 497.37 N 3499.77 W 6009912.35 N 548286.43 E 1.683 3534.64 6673.65 90.060 280.600 3888.16 3956.51 505.71 N 3549.26 W 6009920.34 N 548236.88 E 5.389 3584.82 6719.60 89.810 280.130 3888.21 3956.56 513.98 N 3594.46 W 6009928.29 N 548191.63 E 1.159 3630.76 6769.31 89.260 279.890 3888.62 3956.97 522.62 N 3643.41 W 6009936.59 N 548142.62 E 1.207 3680.45 6814.69 90.560 281.030 3888.69 3957.04 530.86 N 3688.04 W 6009944.52 N 548097.94 E 3.810 3725.81 e 6865.61 90.250 280.580 3888.33 3956.68 540.40 N 3738.05 W 6009953.72 N 548047.86 E 1.073 3776.70 6910.70 90.190 280.420 3888.15 3956.50 548.62 N 3782.39 W 6009961.63 N 548003.46 E 0.379 3821.77 6961.90 90.120 280.410 3888.02 3956.37 557.87 N 3832.74 W 6009970.54 N 547953.05 E 0.138 3872.95 7005.86 89.570 279.830 3888.13 3956.48 565.60 N 3876.02 W 6009977.96 N 547909.72 E 1.818 3916.90 7055.51 90.990 280.560 3887.89 3956.24 574.39 N 3924.88 W 6009986.41 N 547860.79 E 3.216 3966.54 7101.85 90.430 279.770 3887.32 3955.67 582.56 N 3970.49 W 6009994.27 N 547815.13 E 2.090 4012.86 7152.00 91.670 279.590 3886.40 3954.75 590.99 N 4019.92 W 6010002.35 N 547765.65 E 2.498 4062.99 7197.95 91.420 279.170 3885.16 3953.51 598.48 N 4065.24 W 6010009.53 N 547720.28 E 1.063 4108.92 7248.75 90.990 278.700 3884.09 3952.44 606.37 N 4115.41 W 6010017.07 N 547670.05 E 1.254 4159.71 7293.54 90.800 278.820 3883.39 3951.74 613.19 N 4159.67 W 6010023.58 N 547625.74 E 0.502 4204.50 7343.53 91.170 279.050 3882.53 3950.88 620.95 N 4209.05 W 6010031.00 N 547576.31 E 0.871 4254.48 7389.22 90.490 . 278.860 3881.87 3950.22 628.06 N 4254.17 W 6010037.80 N 547531.14 E 1.545 4300.16 7440.63 89.630 278.700 3881.82 3950.17 635.91 N 4304.98 W 6010045.29 N 547480.28 E 1.702 4351.57 7483.07 92.410 279.870 3881.06 3949.41 642.76 N 4346.85 W 6010051.85 N 547438.36 E 7.107 4394.00 7532.78 92.530 279.510 3878.92 3947.27 651.11 N 4395.81 W 6010059.86 N 547389.34 E 0.763 4443.66 7579.16 94.140 279.780 3876.22 3944.57 658.87 N 4441.46 W 6010067.30 N 547343.65 E 3.520 4489.95 7630.44 93.710 280.020 3872.71 3941.06 667.67 N 4491.85 W 6010075.75 N 547293.19 E 0.960 4541 .11 e 7675.46 94.760 279.740 3869.39 3937.74 675.37 N 4536.08 W 6010083.15 N 547248.91 E 2.413 4585.99 7746.00 94.760 279.740 3863.53 3931.88 687.26 N 4605.37 W 6010094.56 N 547179.54 E 0.000 4656.28 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.830° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 7746.00ft., The Bottom Hole Displacement is 4656.37ft., in the Direction of 278.488° (True). 13 August, 2004 - 8:18 Page 3 of 4 DríllQuest 3.03.06.006 Milne Point Unit Comments Measured Depth (ft) 4984.60 5053.00 7746.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 3931 .45 3947.00 3931.88 89.47 N 106.74 N 687.26 N 1923.64 W 1987.96 W 4605.37 W Survey tool program for MPI-17 L 1 PS1 From Measured Vertical Depth Depth (ft) (ft) 0.00 450.00 13 August, 2004 - 8:18 0.00 449.96 'i Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17 L 1PB1 Your Ref: API 500292321270 Job No. AKZZ3171003, Surveyed: 23 July, 2004 BPXA Comment Tie On Point Window Point Projected Survey e To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 450.00 7746.00 449.96 Tolerable Gyro - CB-SS-Gyro (MPI-17) 3931.88 AK-6 BP _IFR-AK - MWD-IIFR-MS (MPI-17) e Page 4 of4 Dril/Quest 3.03.06.006 · RECEIVED SEP 0 ~5 2004 AlæksOiI &. Gas Cons. commiIiOn AnrAøge e )¡(f)'f-017 -/7~ ~ f c¡ 17 -Aug-04 AOGCC Rohi.. I J.ea';:ro-II 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPI-17 L 1 PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 4,984.60' MD 5,053.00' MD 7,746.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services AUn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date f/3f c/ Si9€YfL//L Please call me at 273-3545 if you have anUuestions or concerns. Regards, William T. Allen Survey Manager Attachment(s) Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPI MPI-17L1PB1 MWD e Job No. AKMW3171003, Surveyed: 23 July, 2004 Survey Report 17 August, 2004 Your Ref: API 500292321270 Surface Coordinates: 6009439.29 N, 551789.57 E (70026'11.5176" N, 149034' 39.9045" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1009439.29 N, 51789.57 E (Grid) Surface Coordinates relative to Structure Reference: 350.50 S, 388.52 W (True) Kelly Bushing Elevation: 68.35ft above Mean Sea Level Kelly Bushing Elevation: 68.35ft above Project V Reference Kelly Bushing Elevation: 68.35ft above Structure Reference spel"""l"""'d-sul'1 CRIL.LING seRVices A Halliburton Company Survey Ref: svy1449 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L 1PB1 MWD Your Ref: API 500292321270 Job No. AKMW3171003, Surveyed: 23 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/100ft) 4984.60 75.470 284.620 3863.12 3931.47 92.14 N 1922.55 W 6009518.08 N 549866.43 E 1913.91 Tie On Point ~ 5053.00 78.250 284.960 3878,67 3947.02 .. 109.15 N 1986.94 W 6009534.64 N 549801.92 E 4.093 1980.15 Window Point - 5086.30 83.870 287.920 3883.84 3952.19 118.46 N 2018.47 W 6009543.73 N 549770.32 E 19,023 2012.74 5135.81 90.490 298.670 3886.28 3954.63 137.99 N 2063.80 W 6009562.94 N 549724.86 E 25.467 2060.52 5181.84 90.190 288.770 3886.01 3954.36 156.48 N 2105.88 W 6009581.14 N 549682.65 E 21.517 2104.95 e 5231.55 89.940 299.100 3885.95 3954.30 176.62 N 2151.26 W 6009600.97 N 549637.14 E 20.787 2152.87 5278.00 89.690 293.600 3886.10 3954.45 197.23 N 2192.87 W 6009621.29 N 549595.39 E 11.853 2197.15 5326.51 88,640 293.530 3886.81 3955,16 216.62 N 2237.33 W 6009640.37 N 549550.79 E 2.169 2244.06 5374.43 88.020 291.120 3888,20 3956,55 234.81 N 2281.63 W 6009658.25 N 549506.36 E 5,191 2290.63 5423.63 86.910 293.400 3890.38 3958.73 253.43 N 2327.12 W 6009676.56 N 549460.75 E 5.150 2338.44 5470.22 90.120 293.130 3891.59 3959.94 271.83 N 2369.90 W 6009694.65 N 549417.84 E 6.914 2383.54 5506.39 90,740 294.350 3891.32 3959.67 286.39 N 2403.01 W 6009708.98 N 549384.63 E 3.783 2418.49 5535.29 90.620 293.080 3890.97 3959.32 298.01 N 2429.46 W 6009720.42 N 549358.10 E 4.414 2446.41 5566,19 90,740 292.860 3890.61 3958.96 310.07N 2457.91 W 6009732.28 N 549329.57 E 0.811 2476.38 5615.50 90,930 291.810 3889.89 3958,24 328.80 N 2503.52 W 6009750.70 N 549283.83 E 2.164 2524.32 5662.57 92.160 288.850 3888.62 3956.97 345.15 N 2547.63 W 6009766.74 N 549239,60 E 6.808 2570.42 5714.00 91.660 286.400 3886.90 3955.25 360.71 N 2596.62 W 6009781.96 N 549190.51 E 4.859 2621.21 5759.66 90.620 285,000 3886.00 3954.35 373.06 N 2640.56 W 6009794.01 N 549146.48 E 3.819 2666.53 5803.49 90.990 281.910 3885.38 3953.73 383.26 N 2683.18 W 6009803.91 N 549103.79 E 7.100 2710.21 5854.90 90,740 280.980 3884.60 3952.95 393.46 N 2733.56 W 6009813.76 N 549053.34 E 1,873 2761.56 5899.76 90.490 280.250 3884.12 3952.47 401.72 N 2777.65 W 6009821.71 N 549009.20 E 1.720 2806.40 5951.33 91.730 280.560 3883.12 3951.47 411.03 N 2828.36 W 6009830.67 N 548958.42 E 2.478 2857.94 e 5995.42 91.230 279.950 3881.98 3950.33 418.88 N 2871.73 W 6009838.22 N 548915.00 E 1.789 2902.00 6047.26 90.680 279.790 3881.12 3949.47 427.77 N 2922,80 W 6009846.75 N 548863.87 E 1.105 2953.82 6092.98 90.060 278.360 3880.83 3949.18 434.98 N 2967.94 W 6009853.65 N 548818.68 E 3.409 2999.54 6144.01 89.510 278.400 3881.02 3949.37 442.41 N 3018.43 W 6009860.73 N 548768.14 E 1.081 3050.57 6190.01 89.140 278.230 3881.56 3949.91 449.07 N 3063.94 W 6009867.07 N 548722.58 E 0.885 3096.56 6239.92 89.070 277.960 3882.34 3950.69 456.09 N 3113.35W 6009873.75 N 548673.13 E 0.559 3146.46 6285.70 89.630 279.070 3882.86 3951.21 462.87 N 3158.62 W 6009880.22 N 548627.81 E 2.716 3192.24 6335.76 90.250 281.160 3882.91 3951.26 471.66 N 3207.90 W 6009888.66 N 548578.47 E 4.355 3242.28 6386.57 90.250 278.390 3882.69 3951.04 480.29 N 3257.97 W 6009896.94 N 548528.35 E 5.452 3293.08 6432,26 89.510 279.160 3882.78 3951.13 487.26 N 3303.12 W 6009903.60 N 548483.15 E 2.337 3338.77 6482.37 88.950 280.110 3883.46 3951.81 495.64 N 3352.52 W 6009911.64 N 548433.69 E 2.201 3388.87 6527.50 88.580 277.770 3884.43 3952.78 502.65 N 3397.09 W 6009918.34 N 548389.07 E 5.248 3433.98 6578.15 87.900 278.580 3885.99 3954.34 509.85 N 3447.20 W 6009925.19 N 548338.91 E 2.087 3484.61 17 August, 2004 - 10:16 Page 2 of 4 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L1PB1 MWD Your Ref: API 500292321270 Job No. AKMW3171003, Surveyed: 23 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6623.45 88.330 277.850 3887.48 3955.83 516.32 N 3492.01 W 6009931.35 N 548294.06 E 1.870 3529.88 6673.65 90.060 280.170 3888.18 3956.53 524.18 N 3541.58 W 6009938.87 N 548244.44 E 5.764 3580.07 6719,60 89.810 279.310 3888.23 3956.58 531.96 N 3586.87 W 6009946.33 N 548199.10 E 1.949 3626.01 6769.31 89,260 279.190 3888.64 3956.99 539.95 N 3635.93 W 6009953.98 N 548149.98 E 1.132 3675,72 6814,69 90.560 280.530 3888.71 3957.06 547.72 N 3680.64 W 6009961.44 N 548105.22 E 4.114 3721.09 e 6865.61 90.250 280.050 3888.35 3956.70 556.81 N 3730.73 W 6009970.18 N 548055.06 E 1.122 3771.99 6910.70 90.190 280.120 3888.18 3956.53 564.71 N 3775.13 W 6009977.77 N 548010.61 E 0.204 3817.07 6961.90 90,120 279.790 3888.04 3956.39 573.56 N 3825.56 W 6009986.27 N 547960.12 E 0.659 3868.26 7005.86 89.570 279.300 3888.16 3956.51 580.85 N 3868.91 W 6009993.26 N 547916.72 E 1.676 3912.22 7055.51 90.990 280.120 3887.91 3956.26 589.22 N 3917.84 W 6010001.29 N 547867.73 E 3.303 3961.86 7101.85 90.430 279.410 3887.34 3955.69 597.08 N 3963.51 W 6010008.83 N 547822.01 E 1.951 4008.19 7152.00 91.670 279.400 3886.42 3954.77 605.28 N 4012.98 W 6010016.68 N 547772.49 E 2.4 73 4058.33 7197.95 91.420 279.000 3885.18 3953.53 612.62 N 4058.32 W 6010023.71 N 547727.10 E 1.026 4104.26 7248.75 90.990 278.580 3884.11 3952.46 620.38 N 4108.51 W 6010031.13 N 547676.85 E 1.183 4155.05 7293.54 90.800 278.800 3883.41 3951.76 627.15 N 4152.78 W 6010037.58 N 547632.54 E 0.649 4199.83 7343.53 91.170 279.110 3882.55 3950.90 634.93 N 4202.15 W 6010045.02 N 547583.11 E 0.966 4249.81 7389.22 90.490 278.880 3881.89 3950.24 642.07 N 4247.28 W 6010051.85 N 547537.94 E 1.571 4295.50 7440.63 89.630 278.830 3881.84 3950.19 649.98 N 4298.07 W 6010059.41 N 547487.09 E 1.676 4346.91 7483.07 92.410 280.020 3881.08 3949.43 656.93 N 4339.93 W 6010066.07 N 547445.18 E 7.125 4389.33 7532.78 92.530 279.830 3878,94 3947.29 665.49 N 4388.85 W 6010074.29 N 547396.21 E 0.452 4438.99 7579.16 94.140 279.990 3876.24 3944.59 673.46 N 4434.46 W 6010081.94 N 547350.54 E 3.488 4485.28 7630.44 93.710 280.060 3872.73 3941.08 682.36 N 4484.84 W 6010090.50 N 547300.10 E 0.850 4536.43 e 7675.46 94.760 279.850 3869.41 3937.76 690.13 N 4529.06 W 6010097.95 N 547255.83 E 2.378 4581.32 7746.00 94.760 279.850 3863.55 3931.90 702.15 N 4598.32 W 6010109.49 N 547186.49 E 0.000 4651.60 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.830° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 7746.00ft., The Bottom Hole Displacement is 4651.62ft., in the Direction of 278.682° (True). 17 August, 2004 - 10:16 Page 3 of 4 DrillQuest 3.03.06.006 Milne Point Unit Comments Measured Depth (ft) 4984.60 5053.00 7746.00 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L 1PB1 MWD Your Ref: API 500292321270 Job No. AKMW3171003, Surveyed: 23 July, 2004 BPXA Station Coordinates TVD Northings Eastings ~ ~) ~ 3931.47 3947,02 3931.90 Comment 92.14 N 109.15 N 702.15 N Tie On Point Window Point Projected Survey e 1922.55 W 1986,94 W 4598.32 W Survey tool program for MPI·17L 1PB1 MWD From Measured Vertical Depth Depth (ft) (ft) 0.00 450.00 17 August, 2004 - 10:16 0.00 449.96 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 450.00 7746.00 449.96 Tolerable Gyro - CB-SS-Gyro (MPI-17 MWD) 3931.90 MWD Magnetic (MPI-17 MWD) e Page 4 of 4 DríllQuest 3.03.06.006 . . ....::::;¡ FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point Unit MPI-17Ll BP Exploration (Alaska) Inc. Permit No: 204-099 Surface Location: 2323' NSL, 3581' WEL, SEe. 33, T13N, RlOE, UM Bottomhole Location: 3306' NSL, 4361' WEL, SEe. 32, T13N, RlOE, UM Dear Mr. Archey: Enclosed is the approved application for permit to redrill the above development well. The permit is for a new wellbore segment of existing well MPU 1-17, Permit No, 204-098, API No. 50-029-23212-00. Production should continue to be reported as a function of the original API number stated above. This permit to redrill does not exempt you ftom obtaining additional permits or approvals required by law ftom other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to . ess any required test. Contact the Commission's petroleum field inspector at (907) 659-36 ger). BY ORDER OF '9IE COMMISSION DATED this:attJay of June, 2004 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. o Drill aa Redrill 1 a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2323' NSL, 3581' WEL, SEC. 33, T13N, R10E, UM ,/ Top of Productive Horizon: 2452' NSL, 374' WEL, SEC. 32, T13N, R10E, UM v' Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3306' NSL, 4361' WEL, SEC. 32, T13N, R10E, UM .J 2560 2030' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool Surface: X-551790 / Y-6009440 / Zone,A.SP4 (Height above GL): Plan 69 feet MPI-10 is 1050' away 16. Deviated Wells:, c¡?;./ftl( 17. Maximum Anticipat;d Pressures in psig (see 20 AAC 25;935) Kickoff Depth 5125 ft Maximum Hole Angle ? Downhole: 1875 psig Surface: 1478 psig 1ª.iCasing. Program Specifications Settin!;J~~þtn Size Top ..iBottom Casinç¡ Weiç¡ht Grade Couplinç¡ Lenç¡th MD TVD MD TVD (includinç¡ staç¡e data) 4-1/2" 12.6# L-80 BTC 4090' 5015' 3944' 9215' 3954' Uncemented Slotted Liner I STATE OF ALASKA . ALASKA IL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 MC 25.005 1b. Current Well Class 0 Exploratory o Stratigraphic Test 0 Service 5. Bond: !HI Blanket 0 Single Well Bond No. 2S100302630-277 6. Proposed Depth:, MD 9215' TVD 3954' 7. Property Designation: ADL 025517 k (p II~ . aa Developmen~~i~ S ~~~Q4one o Dßy~IRPJ11~ 9a,~ ..q.Si~~le,Z?ne 11. . ~ elf ¡':¡a'rriã ãnd Nümbè'Ï":í .,..... ÎÌWÞjl17['1 / 12. Field / Pool(s): Milne Point Unit I Schrader Bluff 8. Land Use Permit: 13. Approximate Spud Date: June 30, 2004 Hole 6-3/4" 19. PRESENTW~LL CONDITION SUMMARY (To be COI'I'IPløtèdforRØdtilIAND Re-entry Oþeration$) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD 9237 3734 None 9237 3734 Structural Conductor 80' 20" 260 sx Arctic Set (Approx.) 114' 114' Surface 2320' 10-3/4" 417 sx AS Lite, 273 sx Class 'G' 2350' 2319' Intermediate 5950' 7-5/8" 762 sx Class 'G' 5980' 3880' Production Liner 3962' 4" x5" Screen Assembly 5275' - 9237' 3989' - 3734' 20. Attachments 0 $100 Filing Fee 0 BOP Sketch !HI Property Plat 0 Diverter Sketch IPerfOration Depth TVD (ft): None !HI Drilling Program 0 Time vs Depth Plot o Seabed Report !HI Drilling Fluid Program o Shallow Hazard Analysis !HI 20 AAC 25.050 Requirements Date: Contact Skip Coyner, 564-4395 Perforation Depth MD (ft): None 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Pat Archey Title Senior Drilling Engineer Signature Phone 564-5803 cover letter for requirements D,Yes ~No ~Yes 0 No Permit To Drill (I ~. '.' API N. umber: . 3 '7 / Number: .2Ó r-CIÎ 7 50- ð 2- c¡ .- 2.. 2 I L-'- 1,00 Conditions of Approval: Samples Required 0 Yes .~No Hydrogen Ide Measures 0 Yes ~No ~'r, ~~ ~..\- ORIGiNAL BY ORDER OF THE COMMISSION Date ~~ðfv . . - bp I Well Name: I MPI·17 L 1 OB Lateral Drill and Complete Plan Summary I Type of Well (service I producer I injector): 1 Schrader Bluff Tri-Lateral Producer Surface Location: (As Staked) Target Location: Top NB Target Location: I NO Latèîðl Q,237' Target Location: Top OB Target Location: BHL L 1 9,215' 2,323' FSL, 3,581' FEL, SEC. 33, T13N, R10E E = 551,790' N = 6,009,440' 2,720' FSL, 1,610' FEL, SEC. 32, T13N, R10E E = 548,477' N = 6,009,814' Z = 3,779' TVD 3,306' NSL, 4,361' FEL, SEC. 32, T13N, R10E ~E=545~=f5,010,3~ Z=~Q~D 2,452' FSL, 374' FEL, SEC. 32 , T13N, R10E ./ E = 549,716' N = 6,009,554' Z = 3,969' TVD 3,306' NSL, 4,361' FEL, SEC. 32 , T13N, R10E .( E = 545.7?1' .N = 0,382' Z = 3.954' TVD L~J Distance to Property line 2030' Distance to nearest pool 1050' from MPI-10 AFE Number: I Estimated Start Date: 110 June 04 Rig: I Doyon 14 Rig days to complete: 121 MD: 19215' 1 1 TVD: 13954' 1 1 Max Inc: 19101 I KOP: 15125' I 1 KBE: 69 Well Desiq,n (conventional, slim hole, etc.): I Tri-Lateral Producer Objective: I Schrader Bluff NB, OB & OA 1 " . . Mud Program: 13-1/2" Surface Hole (0 - 2350'): I· Density (ppg) PV ., YP 9.0- 9.3 10 - 20 25 - 30 LSND 1~~~ I 9.0P!! 9.5 I API ~,:ate 'LG ~dS 1 9-7/8" Intermediate Hole (2350 - 5980'): LSND I De::'! J~9)' 1 0 ~V20 I 25 ~~O I :~~ I 9.0P!!9.5 I API~a:-te 'LG ~~dS 'I 6-3/4" NB Production Hole (5980 - 9237'): MOBM rDe:::!~ i}o J ë ~~~ 19.0~9.51~1 ~ Iltl~ 6-3/4" 08 Production Hole (5125- 9215'): M Density(pp~ PV YP HTHP pH API..Filtrate LG >SôUds 9.4-9.6 10-20 25-30 10-119.0-9.5 <6 <15 ~~ - /4' roduc Ion Hole (4865 - 9205'): MOBM IDe~.~~ ær> I 10 :~O I 25 ~~O 11~T_~ I 9.0P~ 9.5 I API ~I:te ILG~~I~S LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. 10-3/4", 45.5#, L-80, BTC Surface Casinp at 2,350' MD Excess from B/Permafrost to Surface = 175% over gauge hole. 40% excess below the B/Permafrost. Tail cement = 500' MD. Total Cement 10 bbl water Volume: 387 bbl Wash 25 bbl CW 100 75 bbl of MudPush 330 bbl, 417 sx of Arctic Set Lite: 10.7 Ppg and 4.44 ft~/sx 57 bbl, 273 sx "G" mixed at 15.8Ib/gal & 1.17 ft"/sx Casing Point BHST 450 F (estimated by Dowell) 7-5/8",29.7#, L-80, BTC-M Intermediate Casing at 5,980' MD Top of cement to be 500' MD above Ugnusands: 40% excess. Shoe Joint = 85 ft. 5-bbl water Wash 25 bbl CW 100 40 bblof MudPush 158 bbl, 762 sx "G" mixed at 15.8Ib/gal & 1.16 ft3/SX BHST =80°F from SOR ~ Cement Program: Casing Size Basis Spacer Lead Tail Temp Casing Size Basis \ Total Cement Volume: 158 bbl Spacer Tail Temp ~ ----- c..C1.~')~\-\1I"'\.. ~~r-~Oç-Q: ~ ---.-------... . "'----- ~--- 2 . Evaluation Program: 13-1/2" Section Open Høle: . Cased Hole: MW DIG R IFRlCASANDRA Sperry InSite N/A 9-7/8" Section Open Hole: MWD/GRlRES IFRlCASANDRA Sperry InSite (~:'lN~~~ ~~ 6-3/4" Section Open Hole: MWD/GRlRES/ABI L ~~ L;).. IFRlCASANDRA Sperry InSite Cased Hole: N/A Formation Markers: Formation Tops MD TVD (ft) Pore Pressure EMW (ft) (psi) (Ib/gal)* BPRF 1,809 1,789 Tuze 3,600 3,294 1400 8.2 Ugnu-MA 3,982 3,522 1499 8.2 Ugnu-MB1 4,000 3,533 1504 8.2 Ugnu-MB2 4,071 3,575 1522 8.2 Ugnu-MC 4,310 3,700 1577 8.2 SBF2..NA 4,421 3,746 1768 9.1 SBF1-NB 4,468 3,763 1776 9.1 SBE4-NC 4,561 3,795 1791 9.1 SBE2-NE 4,617 3,814 1800 9.1 SBE1-NF 4,760 3,863 1824 9.1 TSBD-Top OA 4,877 3,903 1843 9.1 T~O.oa&e..OA \ 4,984 3,936 1859 -, 9.1 L TSBB-TopOB '~125 '~,969 ~ 1875 9.1 ~ ~B\. 5,248 3,987 1884 9.1 ~ '- \.. '- TSBB-Top DB Upgoing 5,730 3,954 1868 9.1 TSBC-Base OA Upgoing 5,850 3,919 1851 9.1 TSBD-Top OA Upgoing 5,970 3,882 1833 9.1 SBEI-NF Upgoing 6,110 3,842 1814 9.1 SBE2-NE Upgoing 6,295 3,796 1792 9.1 SBE4-NC Upgoing 6,420 3,779 1783 9.1 SBF12-Base NB Sand Upgoing 6,565 3,771 1779 9.1 / NB owe OA owe OBowe 4,163 4,189 4,167 3 . CasinglTubing Program Hole SizeCsg I· WtlFt . i Grade Conn Length TbgO.O. . 42-in 20-in* 92# H-40 Welded 80' 13.5 in 10. 75-in 45.5# L-80 BTC-M 2,320' 9.875 in 7.625-in 29.7# L-80 BTC-M 5,950' 6.75 in 4" X 5" Screens L-80 4" IBT 3,962' ~n~.~ ~ ~;90' . ~n 4.5-in . - \... ~ OA Slotted 12.6# L-80 BTC 4,340' " Recommended Bit Program: BHAHole SizeOepth (MO) Footage 1 13.50 in Suñ - 2,350' 2,320' 2 9.875 in 2,350' - 5,980' 3,630' 3NB 6.750 in 5,980' - 9,237' 3,257' 30B 6.750 in 5,125' - 9,215' 4,090' 30A 6.750 in 4,865' - 9,205' 4,340' Well Control: Intermediate/Production hole: · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: · Integrity tests: Kick tolerance: · Planned completion fluid: . Top MO/TVD .. 34' 30' 30' BOttom ·MO I TVO 114'/114' 2,350' / 2,319' 5,980' / 3,880' 5,275' / 3,989' 9,237' / 3,734' 5,01~' 13,944~,215' 13~954' ) ~ ....~ 4,750' / 3,899' 9,205' I 3,879' TFA .85 - 1.0 .60 - .85 .35 - .50 .35 - .50 .35 - .50 GPM 450 - 650 500 - 600 275 - 325 275 - 325 275 - 325 Bit Type MXC1 PDC PDC PDC PDC 1,875 psi at 3,969' TVD (Top of the OB sand) v 1,478 psi at surface (Based on a full column of gas at 0.1 psi/ft) ./ 3,000 psi FIT to 12.0 Ib/gal 20' below the 10-3/4" shoe. 38-bbl with 9.3 Ib/gal mud at below the 10-3/4" shoe. MOBM in Laterals with 9.8 ppg Brine and Diesel above. D.· lina H~ds & Contingencie~: · Hydrates have been encountered on I-Pad wells between 1,700' and 2,300' TVD. ./ · Tight hole and packing off due to clays and poor hole cleaning has occurred on I Pad wells. · Sloughing / caving coal beds have been encountered on I Pad. · Over-Pressured sands have been encountered on I Pad due to offset injection wells. v ~,:;,\\&0 ~~<::>"'" 4 . . Lost Circulation · We do not expect losses while drilling this well. · Offset wells have not reported losses while drilling. However if seepage and/or losses occur, follow the LOST CIRCULATION DECISION MATRIX in the well plan. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · The Schrader Bluff sands were over-pressured from offset injection wells while drilling 1-12 & v 1-13. That situation has since beon rectified. Pad Data Sheet · Please Read the I-Pad Data Sheot thoroughly. Breathing · Not expected or predicted. Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Faults · Four faults are mapped that intersect the "OB" lateral: one at ± 5335' MD, one at ± 6500' MD, ,/ one at ± 8,060' MD, and the final fault at ± 8660' MD. Hydrogen Sulfide · MPI Pad is not designated as an H2S Pad. v Anti-collision Issues · The only anti-collision issue for th,e OB lateral is its proximity to the main wellbore and to the, NB lateral. Distance to Nearest Property · MPI-17 is 2,030 ft from the nearest Milne Point property line. ./ Distance to Nearest Well Within POlol · MPI-17 is 1,050 ft from the nearest Schrader Bluff NB sand penetration in MPI-10. ,/ 5 · . DRILL & COMPLETION PROCEDURE Pre-Ria Operations 1. The 20" conductor will be installed pre-rig. Drillina (" Run whipstock and mill window for OB lateral. Drill 6-3/4" OB horizontal production hole. L ~ 12. Retrieve whipstock. ~5" Slott~ and hang off in 7.625" æsing 14. Run whipstock and mill window for OA lateral. ~ '--' I oJ. ....rill 6-3/4" OA horizontal production hole. 16. Retrieve whipstock. 17. Run 4.5" slotted liner and hang off in 7.625" casing 18. Displace MOBM with Brine 19. RU and Run 2.875" ESP Completion. 20. NO BOP/NU Tree 21. Freeze Protect. 22. RDMO Doyon 14. 6 . -- "0< ~D,· \J ~ ~ ~ 3..:, ~ . .~~ o~ ~ ~ \} ~~ ' ".~ \~ .~ ~~~J~t . ':~~ß\) ß n Ì1'I~ ~ .... . ß} 1 Þ 0.1 0;\ì \ I ASP GRID '\ - Z A. 2'34'41" I I-PAD PLANT) hÅA--T--Å--A--Á-A--Á~ I I r< I I I I-< I I ¡-< I I k I I I I' I I I-< I I :~ I I I-< I I I I' I I k I I I r I I I I >i I I J I I ,.j I I I >-1 I I >i I I J I I I >i I I ~ I I I >-¡ I I >-i I I I >-¡ I I i ,.., ¡ >-: : i >-¡ ¡ : >-< : f--_L -- - - y -- -- _L_ _ __ L _ _ _ _ '¡' _ _ _ __ _L -) I NOTES 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, ALASKA, NAD 27. 2. PAD SCALE FACTOR IS 0.9999031 3. HORIZONTAL & VERTICAL CONTROL IS BASED ON MPU I-PAD MONUMENTS 1-1 AND 1-2. 4. DATE OF SURVEY: MAY 9, 2004. 5. REFERENCE FIELD BOOK: MP04-03 PAGES 58-59. .14 .13 .12 .11 · 8 · 7 .4 .6 · 3 · 5 · 2 · 9 .1 MAP N.T.S. LEGEND + AS-STAKED CONDUCTOR . EXISTING CONDUCTOR o EXISTING AS-STAKED CONDUCTOR LOCATION .10 .15 +1-16 +1-17 018 019 MPU I-PAD LOCATED WITHIN PROTRACTED SEC. 33, T. 13 N., R. 10 E., UMIAT MERIDIAN, ALASKA - WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS I 16 Y= 6,009,440.87 N 1,120.00 70'26'11.535" 70.4365375' 34.7' 2,324' FSL - X= 551,759.58 E 1,465.00 149'34'40.784" 149.5779956' 3,611' FEL I 17 Y= 6,009,439.52 N 1,120.00 70'26'11.520" 70.4365333' 34.7' 2,323' FSL ,/ - X= 551,789.55 E 1,495.00 149'34'39.905" 149.5777514' 3,581' FEL ,/ N , ~ o 5/10/04 ISSUED FOR INFORMATION NO. DA'IE REVISION ~Œt, DRAWN: ObP JACOBS CHECKED: ALUSON DATE: 5/10/04 DRAWING: MILNE POINT UNIT I-PAD SHEET: FRB04 MPI 02-00 ~ ¡u~~rnœO JOB NO, SCALE: AS-STAKED CONDUCTORS JJ RFA ENGINEERSANOLNIOSUR'o£YORS WELLS MPI-16 & MPI-17 1 OF 1 IIC)I~ARE1IEEOlAH£ 1'=150' BY CHK """"""''''''''''''''' MPI...1 "08" Lateral ~ l10-314", 40.5#, L-80, BTC at 2350' MD MPI...1 inverted Tri-lateral N8, OA & 08 Producer 9-1/8" Hole with lSND Mud NB Sand: 3130' - 3780' TVD TOl:= 5015' MD ----- 7-5/8" Shoe set at 1 080 " S890' MD -- //",""'\ 6-3/4" Hole with MOBM 9231' MD , , , , , , , " " " .... .... .... ........ .... 013 Sand TVD 9215' ~-~-------------~------~-~-------- ------------ __tJIiIISiSI_____ .....___._______81!1111111 S 5/21/2004 ..... J~[ ?¡'ffff ... ....... ¡: .... ! ...... . i""1'L?' ! !! i ~.; p ....... h ~jj .... i / ! ..... ... .L I ! i i ... ! fll········ .. i + i ui i It ...... ! ....... . i .......... ... ... 1 ii'&;;' f i i ::.L:;;; i it ! i i iii .! .... ....... .. i i !....... i i : I i···· re¡ I I I i i !! i "~if~ i······ - i·'· ....... .. ! i ! ...... i r i i i i ! ! ! i ! i ! ! ! i i! ! Iii . i i! ! i i I ! ! ! ! !! I I i I ! : I : , I I I ! : : I i ! I :: : 1.1 : ¡ ¡ ¡ ! : : I ! i ! ! I ! I " ! : : ! : : i : : , CDMPANY DETAll.S REFERENCE INFORMATION IWAnK:ICO &DO TARGET DETAILS Noune TVD +N!~S +EI·W Northing EastÎng Shape ø ¡rIP I 1 .I I, "" FORMA T10N TOP DETAILS No. TVDPath MDPath Formation 3969,30 5125.40 TSBB-Top OB 3000- 350(j--> <r â'i g ~ -S '" " c:¡ 11 'i 4000- >- ... I: ¡... 4500- 1500 I 3000 3500 4000 VertìcaJ Section at 218.83° [500ft/in] 2000 2500 SURVEY PROORA...t.1 Depth Fm Depth Tt¡ SurveyfPian 5125.00 9214.79 PJanrtiX!.: MPI-17 L! WP06 V2g Plan: MPI-I? LI WPÚ6 (PlanMPI¥!7 ThorfPlan MPI-17 U) Too1 Created By: Troy Jakabosk)' Checked: Date: 4117/2004 MWD+IFR+MS Date Reviewed: Date:~ WELL DETAlLS """" +N!~S +E/-W - ,",<ring uûtude Longiruœ Slot Plan MPI-t7 Thor iì}4U9 1:;50.92 6009439.52 551789.55 71n6'1 L520N 149"34'39.9Ü3W NlA SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target 5125,00 19.04 289.41 3969.22 JJ4.76 -2013.63 0.00 0.00 2066.61 5145.00 19,25 291.90 3912.99 121.70 -2092.00 12.00 85.00 2085,89 5264.18 93.31 289.26 3980.10 16338 -2203,06 12.00 -10.11 2202.03 5584.31 93.31 289.26 3962.20 268,81 -2504.76 0.00 0.00 2516.34 5684,58 90.00 281.00 3959.30 300.00 -2600.00 4.00 -145.63 2615.24 5940,39 90.20 216,17 3958.86 352.61 -2849.99 4,00 -88.90 2870,34 6191.19 90.20 276.77 3958.00 382.24 -3099.63 0.00 0.00 3121.51 6305.12 88.50 281.00 3959.30 399.84 -3212.16 4.00 JJ 1.86 3235.41 MP1-!7 L1 T1.2 6361.91 88.41 278.15 3960.82 409.48 -3267.55 4.00 -92.39 3291.68 1188,20 88.41 278,15 3983,78 535.14 -4083.85 0.00 0.00 4117.59 J! 1211.84 90.88 281.00 3984.30 549.48 -4166.24 4.00 42.24 4201.21 MP1-17 L1 TI.2 12 7288.89 90,88 281.68 3984.04 552.83 -4182.95 4.00 89.99 4218.24 13 ' 9214.79 90.88 281.68 3954.30 942.74 -6068.74 0.00 0.00 6141.53 MP1-17 L1 T3.2 CASING DETAILS No. TVD MD Name Síze 3954.3 t 9214.00 41/2" 4.500 I 4500 ! 5000 6000 5500 Plan; MPI·j7 L! WP06 (Plan MP[~17 ThoriPlanMPI·17 LJ Created By: Troy Jilibosky Date: 4117/2004 \1¡IELL DETAILS +Nt-S ""Ei~W Northing &sting Latitude Longitude: Slol 1041 1550.92 6009439.52 551789.55 70<>26'1 1.520N !49~34'39.905W MIA TARGET DETAILS """' TVD +NI-S ~·Ef-W Northing Easting Shape FORMATION TOP DETAILS No. TVDPath MDPath Formation 1 3969.30 5125.40 TSBB-TopOB CASlNG DETAILS No. TVD MD Name Size 1 3954.3 ! 9214.00 4112" 4.500 REFERENCE rNFORM." TION SURVEY PROGRAM Depth Fm Depth To SurveylPl1ill Too! 5125.00 9214.79 Planned; MP!·17 LI WP06 \128 MWD+!FR+MS 6930 SECTION DETAILS MD !nc Azi TVD +N/-S +E!-W Dug TFace VSec Target 79.04 0.00 0.00 MP!-17 Ll TL2 COMPANY DETAILS BP Amúeo - 1 i - - i . i· ., - , - - . '-'- . - , - - . , - , ' , ¡ - - - , . i , · 1 i . . . - - . , · 1 ; · i · - ! ; 1 .... · . - '1-.7 .IW -.,- . .,.., .. · . .-= I ; . ' ---I ,~, ,~, ""' -~, \ / .~ -.. i_l L1 T .2 1 ~ , . -;~ - . 'u . ~ I . ",I I \ .. .01 ." ,_I -\-~ . ,- .. , , , , , , , , I , , I I , , , , , , , , , I , , , , , , , , , , , , , , , , , , , 1400--- 700--- -¡:¡ â c c t:., +' ~ ~ I '" -700 -1400 -2!OO .3500 (700ft/in] -4200 -4900 -5600 0--- -700 -7000 Halliburton Sperry-Sun roposal Report 11 June, 2004 .../ / Surface Coordinates: 6009439.52 N, 551789.55 E (70' 26'11.5199" N, 149' 3" 39.9051" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 69.30ft above Mean Sea Level 11I=I- '~-.J" DftU....L.IN. SIU"t.vu:as AHllIIIIiINrit!t!~ . e Proposal Ref: pro1423 Halliburton Sperry-Sun Proposal Report for MPI-17 L1 Wp 6.0 Revised: 11 June, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northin9s Eastin9s Northin9s E Comment (ft) (ft) (ft) (ft) (ft) (ft) 5125,00 79.035 289.463 3899.96 3969,26 114.80 N 6009539.9 2066.65 Tied on at 51 25.00ft 5145,00 79,250 291.900 3903.73 3973,03 121.73N 6009546. 1 2,014 2085.87 Continue BuildlTurn at 5145.00ft 5200.00 85.737 290.671 391 0.91 3980.21 141.51 N 6009566.1 12.002 2139.09 5264.1 8 93.310 289.260 3911,44 3980.74 163.41 N 6009587.63 12.002 2202.01 End of BuildlTurn at 5264.18ft 5300.00 93.310 289.260 3909.37 3978.67 175,21 N .19N 0.000 2237,18 e 5400,00 93,310 289.260 3903.60 3972.90 .46N 549457,1 2 E 0,000 2335.36 5500.00 93.310 289.260 3897.83 3967.13 3.74N 549362.65 E 0,000 2433.54 5584.31 93.310 289.260 3892.96 3962.26 90.95 N 549283.00 E 0.000 2516.32 Start DroplTurn at 5584.31 ft 5600.00 92.792 288.906 3892,1 2 3961.42 695,97 N 549268.1 6 E 3.996 2531,74 5684,58 90.000 287.000 3890.06 3959.36 6009721.47 N 549187.55 E 3.996 2615.21 Start BuildlTurn at 5684. 58ft 5700.00 90.012 286.383 2614.75 W 6009725.79 N 549172,75 E 4.000 2630.49 5800.00 90.091 282.384 2711.59 W 6009749.96 N 549075.74 E 4.000 2730.00 5900.00 90.169 278.385 2809.93 W 6009767,30 N 548977.27 E 4.000 2829.94 5940.39 90.200 276.770 2849,97 W 6009772.34 N 548937.20 E 4.000 2870,32 End of BuildlTurn at 5940. 39ft 6000,00 90,200 276,770 2909,16 W 6009778.96 N 548877,96 E 0.000 2929,89 6100.00 371.44 N 3008.46 W 6009790.06 N 548778,58 E 0,000 3029.83 61 91.79 382.26 N 3099.61 W 6009800.25 N 548687.36 E 0,000 3121.56 Start DroplTurn at 6191. 79ft 6200,00 383,25 N 3107.76 W 6009801,18 N 548679.20 E 4.001 3129,76 6300,00 398,77 N 3206.52 W 6009816.01 N 548580.33 E 4.001 3229,73 6305,72 399.85 N 3212.14 W 6009817,05 N 548574.71 E 4.001 3235.45 Continue DroplTurn at 6305. 72ft 6361.97 3891.55 3960.85 409.49 N 3267,53 W 6009826.31 N 548519.25 E 4.002 3291.67 End of DroplTurn at 6361.97ft 6400.00 3892.60 3961,90 415.28 N 3305.11 W 6009831.83 N 548481.64 E 0.000 3329.68 e 6500.00 3895.38 3964.68 430.48 N 3403.90 W 6009846.35 N 548382,74 E 0,000 3429.64 6600.00 3898.15 3967.45 445.69 N 3502.70 W 6009860.87 N 548283,84 E 0,000 3529.60 6700.00 3900.93 3970.23 460.90 N 3601.50 W 6009875,39 N 5481 84.94 E 0,000 3629.57 6800,00 88.410 278.750 3903.70 3973.00 476,10 N 3700.30 W 6009889,91 N 548086.04 E 0.000 3729.53 6900,00 88.410 278.750 3906.48 3975,78 491.31 N 3799.10 W 6009904,43 N 547987.13 E 0.000 3829.49 7000.00 88.410 278,750 3909.25 3978,55 506.51 N 3897.89 W 6009918,95 N 547888.23 E 0.000 3929.45 7100.00 88.410 278.750 3912.03 3981.33 521.72 N 3996,69 W 6009933.47 N 547789.33 E 0.000 4029.41 7188.20 88.410 278.750 3914.47 3983.77 535.13 N 4083.83 W 6009946.28 N 547702.10 E 0.000 4117,58 Start BuildlTurn at 7188.20ft 7200.00 88.758 279.068 391 4.76 3984,06 536.96 N 4095,49 W 6009948.03 N 547690.43 E 3.995 4129,37 7271,84 90.880 281.000 3914.99 3984.29 549.48 N 4166.22 W 6009960.05 N 547619.62 E 3.995 4201.19 StartTurn at 7271.84ft 7288,89 90.880 281,680 3914.73 3984.03 552,83 N 4182.93 W 6009963.29 N 547602.88 E 3.988 4218.22 7300.00 90.880 281.680 3914.56 3983,86 555.08 N 4193.81 W 6009965.46 N 547591.98 E 0.000 4229.32 7400.00 90.880 281.680 3913.02 3982,32 575.32 N 4291.73 W 6009985.02 N 547493.93 E 0.000 4329,18 11 June, 2004 - 8:36 Page 2 of 4 DrillQuest 3.03.06.002 Milne Point Unit Measured Depth Incl. (ft) 7500.00 90.880 7600.00 90.880 7700.00 90.880 7800,00 90,880 7900.00 90.880 8000,00 90.880 8100,00 90.880 8200.00 90.880 8300.00 90.880 8400,00 90.880 8500.00 90.880 8600.00 90.880 8700,00 90,880 8800.00 90.880 8900.00 90.880 9000,00 9100,00 9200.00 9214.79 All data is in Vertical depth Global Northin Halliburton Sperry-Sun Proposal Report for MPI-17 L1 Wp 6.0 Revised: 11 June, 2004 BPXA True Sub-Sea Vertical Local Coordinates Global Coordinates Azim. Depth Depth Northings Eastings Northings E Comment (ft) (ft) (ft) (ft) (ft) 281,680 3911,49 3980.79 595,56 N 6010004.5 4429.04 281.680 3909.95 3979,25 615.80 N 6010024.1 4528,91 281.680 3908.41 3977. 71 636.04 N 601 0043,7 4628.77 281.680 3906.88 3976.18 656.29 N 60 063,27 4728.64 281.680 3905.34 3974.64 676.53 N .83 N 4828.50 e 281.680 3903.81 3973.11 .39N 546905,59 E 0.000 4928.37 281.680 3902,27 3971.57 1.95N 546807.54 E 0,000 5028.23 281.680 3900.74 3970.04 41.52 N 546709.48 E 0.000 5128.10 281.680 3899.20 3968.50 161.08 N 546611.42 E 0.000 5227.96 281.680 3897.66 3966.96 6010180.64 N 546513,37 E 0.000 5327.83 281.680 5368.83 W 6010200.20 N 546415.31 E 0.000 5427.69 281.680 5466.74 W 6010219.76 N 546317.26 E 0.000 5527.55 281.680 5564,66 W 6010239.32 N 546219,20 E 0,000 5627.42 281.680 5662.58 W 6010258,89 N 546121.14E 0.000 5727.28 281.680 5760.50 W 601 0278.45 N 546023.09 E 0.000 5827.15 899.19 N 5858.42 W 6010298.01 N 545925.03 E 0.000 5927,01 91 9.44 N 5956,33 W 6010317,57 N 545826.98 E 0.000 6026,88 939.68 N 6054.25 W 6010337.13 N 545728,92 E 0,000 6126,74 942.67 N 6068.73 W 6010340.03 N 54571 4.42 E 0.000 6141.51 Total Depth at 9214. 79ft otherwse stated. Directions and coordinates are relative to True North. Northings and Eastings are relative to Well. are relative to NAD27 Alaska State Planes, Zone 4. e The Dogleg Seve IS in Degrees per 1 00 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.829° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9214,79ft, The Bottom Hole Displacement is 6141,51 ft, in the Direction of 278.829° (True). The Along Hole Displacement is 6502.93ft The Total Accumulated Dogleg is 136,057° The Planned Tortuosity is 2.476° 11 OOft The Directional Difficulty Index is 6.0. 11 June, 2004 - 8:36 Page 3 of4 DrillQuest 3.03.06.002 Milne Point Unit Comments Measured Depth (ft) 5125.00 5145.00 5264.18 5584.31 5684.58 5940.39 6191.79 6305,72 6361.97 7188,20 7271.84 921 4.79 11 June, 2004 - 8:36 Halliburton Sperry-Sun Proposal Report for MPI-17 L1 Wp 6.0 Revised: 11 June, 2004 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 3969,26 3973.03 3980.74 3962.26 3959.36 114,80N 1 21.73 N 163.41 N 268.83 N 300.01 N 2073.60 W 2091.98 W 2203.03 W 2504.74 W 2599.97 W 3958,91 3958.04 3959.33 3960.85 3983.77 End of /Turn at 5940.39ft Drop/Turn at 6191. 79ft tinue Drop/Turn at 6305, 72ft End of Drop/Turn at 6361, 97ft Start Build/Tum at 7188.20ft Start Tum at 7271.84ft Total Depth at 9214. 79ft Page 4 of4 BPXA . e DrillQuest 3.03.06.002 e Halliburton Company. Anticollision Report GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 ofreference Interpolation Method: MD Interval: 25.00 ft Depth Range: 69.30 to 9236.92 ft Maximum Radius: 1116,76 ft Reference: Error Model: Scan Method: Error Surface: Plan: MPI-17 wp12 & NOT PLANNED PROGRA ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Casing Points 2349.94 2319.30 10.750 13.500 103/4" 5980.00 3879.51 7.625 9.875 7 5/8" 9236.00 3734.34 4.500 6,125 5 1/2" Plan: MPI-17wp12 Principal: Yes Summary Date Composed: Version: Tied-to: 3/11/2004 145 From Well Ref. Point M pt H Pad Plan Trinity Trinity V1 Plan: Trini 4648.74 10750.00 335.87 267.60 68.27 Pass: Major Risk M pt Pad MPI-01 MPI-01 V1 1116.73 1150.00 49.47 31.11 18.35 Pass: Major Risk MPt Pad MPI-01 Plan MPI-01A VO Plan: 1117.15 1125.00 49.47 31.08 18.39 Pass: Major Risk MPt Pad MPI-01 Plan MPI-01AL 1 VO Plan 1117.15 1125.00 49.47 31.17 18.30 Pass: Major Risk M pt Pad MPI-02 MPI-02 V1 986.29 1025.00 157.86 24.87 132.99 Pass: Major Risk M pt Pad MPI-03 MPI-03 V1 1395.39 1400.00 151,73 40.73 111.00 Pass: Major Risk M pt Pad MPI-05 MPI-05 V1 1595.86 1625.00 192.72 31.08 161.64 Pass: Major Risk M pt Pad MPI-06 MPI-06 V10 677.89 675.00 268.04 15.01 253.02 Pass: Major Risk M pt Pad MPI-07 MPI-07 V1 845.77 850,00 321.95 25.40 296.55 Pass: Major Risk MPt Pad MPI-09 MPI-09 V12 626.82 625.00 139.97 11.88 128.09 Pass: Major Risk Mpt Pad MPI-10 MPI-10 V8 505.93 500.00 79.67 9.32 70.35 Pass: Major Risk M pt Pad MPI-10 MPI-10A V1 505.93 500.00 79.67 9.48 70.19 Pass: Major Risk M pt Pad MPI-12 MPI-12 V10 529.18 525.00 411.87 8.66 403.21 Pass: Major Risk M pt Pad MPI-12 MPI-12L 1 V11 529.18 525.00 411.87 8.55 403.31 Pass: Major Risk M pt Pad MPI-12 MPI-12PB1 V4 529.18 525.00 411.87 8.66 403.21 Pass: Major Risk M pt Pad MPI-12 Plan MPI-12 A (Thor T 5997.65 4950.00 181.98 165.81 16.17 Pass: Major Risk MPt Pad MPI-13 MPI-13 V6 354.79 350.00 444.45 7,81 436.64 Pass: Major Risk M pt Pad MPI-15 MPI-15 V6 1074.74 1075.00 34.44 21.61 12.83 Pass: Major Risk M pt Pad MPI-15 MPI-15L1 V2 1074.74 1075.00 34.44 21.40 13.04 Pass: Major Risk M pt Pad MPI-15 MPI-15PB1 V5 1074.74 1075.00 34.44 21.66 12.78 Pass: Major Risk M pt Pad Plan MPI-14 Odin MPI-14 L 1 VO Plan: MPI 7667.15 6100.00 252.99 170.61 82.38 Pass: Major Risk MPt Pad Plan MPI-14 Odin Plan MPI-14 PB1 V10 PI 7667.15 6100.00 252.99 170.07 82.92 Pass: Major Risk MPt Pad Plan MPI-17 Thor Plan MPI-17 L 1 VO Plan 3300.00 3300.00 0.00 0.00 0.00 FAIL: NOERRORS MPt Pad Plan MPI-17 Thor Plan MPI-17 L2 VO Plan 3300.00 3300.00 0.00 0.00 0.00 FAIL: NOERRORS M pt Pad Plan MPI-Freya Plan MPI-Freya VO Plan 9194.46 7575.00 365.72 143.04 222.68 Pass: Major Risk M pt Pad Plan MPI-LlNK Plan MPI-LlNK VO Plan: 375.25 375.00 61.03 10.03 51.01 Pass: Major Risk M PtI Pad Plan MPI-Tank Plan MPI-Tank VO Plan: 350.62 350.00 264.36 9.41 254.95 Pass: Major Risk M pt I Pad Plan MPI-Uller Plan MPI-Uller V1 Plan 450.26 450.00 264.18 10.14 254.05 Pass: Major Risk M pt I Pad Plan MPI-Valhalla Plan MPI-Valhalla VO P 450.03 450.00 264.55 10.89 253.65 Pass: Major Risk Site: M pt H Pad Well: Plan Trinity Rule Assigned: Major Risk Wellpath: Trinity V1 Plan: Trinity Wp 1 V5 Inter-Site Error: 0,00 ft 4780.94 3870.37 9850.00 4059.23 13.27 98.25 25.24 100.24 6.000 1114.30 392.06 722.24 Pass 4777.27 3869.11 9875.00 4059.67 13.25 98.22 25.56 100.56 6.000 1090.37 391.53 698.83 Pass 4773.59 3867.85 9900.00 4060.11 13.22 98.20 25.90 100.90 6.000 1066.47 390.98 675.49 Pass 4769.92 3866.60 9925.00 4060.56 13.20 98.17 26.26 101.26 6.000 1042.62 390.40 652.22 Pass 4766.25 3865.34 9950.00 4061.00 13.18 98.14 26.63 101.63 6.000 1018.80 389.78 629.02 Pass 4762.58 3864.09 9975.00 4061.44 13.15 98.12 27.02 102.02 6.000 995.03 389,12 605.91 Pass 4758.90 3862.83 10000.00 4061.88 13.13 98,09 27.42 102.42 6,000 971.31 388.43 582.88 Pass 4755.23 3861.57 10025.00 4062.33 13.11 98.06 27.85 102.85 6.000 947.64 387.68 559.96 Pass WELL DETAU.S ANTI-COLLISION SETTINGS COMPANY DETAILS Name Northing Eæ.iing !,.¡¡(ìlUik Longitude Slol Interpolation Mciliod:MD De.pth Range From 5125.00 Maximum RDnge 1114.55 BPAmœo Plan MPI·17 Thof 1041.19 155(),<)2 6009·H9.52 55178.9.55 70"26'11.520N i4'Y34'39.905W N/A -640 --600 -soo -400 -300 '"""'200 -100 -0 -100 '"""'200 -300 -400 -soo --600 -640 U WP06 o Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [200ft/in] Se<: 1 3 " 5 6 7 3 9 10 II 12 13 From o o 500 1000 1500 2000 2500 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 DcpÙ1 Fm fkpth Tü SW'vey/Phm 5 !25.00 921479 Colour ToMD o 500 1000 1500 2000 2500 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 90 MD Ine 'IVI) SECTION DETAiLS SURVr,:y PRf)(ìRAM 1'001 MWD+tFR+MS WI·]J.PATH nF-:TAJLS PianMP!-!7!.1 RK!3(J4J + (,')}Olì 27K8},' (JOO (JOO (¡~..:W LEGEND MP¡·!7 L! 1'1.2 MPI-17LI n.2 MPI·17 U TJ.2 .; . BP Planning Report Company: Field: Site: WeD: WeDpath: Plan: BP Amoco Milne Point M PlI Pad Plan MPI-17 Thor Plan MPI-17 L 1 MPI-17 L 1 WP06 Date: 4/19/2004 Time: 09:03:38 Co-ordlnate(NE) Referenee: Well: Plan MPI-17 Vertical (TVD) Referenee: 69.3 RKB(34.3 Seetlnø (VS) Referenee: Well (O.OON.O. Survey Caleulatioø Method: Minimum C ature Date Composed: Version: Tied-to: Principal: Yes Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Site: M Pt I Pad TR-13-10 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Well: Plan MPI-17 Thor WeD Position: +N/-S 1041.19 ft Northing: +E/-W 1550.92 ft Easting: Position Uncertainty: 0.00 ft Wellpath: Current Datum: Magnetic Data: Field Strength: Vertical Section: . 0.39 deg 11.520 N 39.905 W Plan MPI-17 / 5125.00 ft v Mean Sea Level 24.92 deg 80.85 deg Direction deg 278.83 Casing Points MD TV» Diameter Name ft ft In 9214.00 3954.31 4.500 4 1/2" Formations MD TV» Formations Lithology Dip Angle Dip Direction ft ft deg deg 0.00 BPRF 0.00 0.00 0.00 TUZC 0.00 0.00 0.00 Ugnu-MA 0.00 0.00 0.00 Ugnu-MB 0.00 0.00 0.00 Ugnu-M 2 0.00 0.00 0.00 Ugnu- 0.00 0.00 0.00 SBF2- A 0.00 0.00 0.00 SBF NB 0.00 0.00 0.00 SB -NC 0.00 0.00 0.00 S 2-NE 0.00 0.00 0.00 E1-NF 0.00 0.00 0.00 SBD-Top OA 0.00 0.00 0.00 SBC-Base OA 0.00 0.00 5125.40 3969.30 TSBB-Top OB 0.00 0.00 0.00 SBA5-Base OB 0.00 0.00 Targets +EI-W ft -2074.00 -6106.49 Map Map Northiøg Easting ft ft 6009540.00 549715.00 6010520.00 545676.00 Name Deseription Dip. Dir. +N/-S ft 114.90 1123.02 TV» ft 3779.30 3779.30 MPI-17 Poly -Polygon 1 <-- Latitude --> <- Longitude -> Deg Mln See Deg MiD See 70 26 12.647 N 149 35 40.774 W 70 26 22.540 N 149 37 39.147 W -l Company: Fidd: Site: WeD: WeUpath: Targets Name' -Polygon 2 -Polygon 3 -Polygon 4 -Polygon 5 -Polygon 6 BPAmoco Milne Point MPtIPad Plan MPI-1 t Thor Plan MPt-17L 1 . Description TVD Dip. Dir. ft 3779.30 3779.30 3779.30 3779.30 3779.30 3954.30 3959.30 3984.30 MPI-17 L 1 T3.2 MPI-17 L1 T1.2 MPI-17 L1 T2.2 Plan Section Information MD ft 5125.00 5145.00 5264.18 5584.31 5684.58 5940.39 6191.79 6305.72 6361.97 7188.20 7271.84 7288.89 9214.79 Survey MD ft 5125.00/ 5125.40 5145.00 5150.00 5175.00 5200.00 5225.00 5250.00 5264.18 5300.00 5400.00 5500.00 5584.31 5600.00 5684.58 5700.00 5800.00 5900.00 5940.39 6000.00 6100.00 6191.79 6200.00 6305.72 Incl deg 79.04 79.25 93.31 93.31 90.00 90.20 90.20 88.50 88.41 88.41 90.88 90.88 90.88 Azlm deg 289.47 291.90 289.26 289.26 287.00 276.77 276.77 281.00 278.75 278.75 281.00 281.68 281.68 Incl deg 79.04 79.04 79.25 79.84 82.79 Azlm deg 289.47 289.51 291.90 291.79 291.23 85.74 88.69 91.64 93.31 93.31 93.31 93.31 93.31 92.79 90.00 90.01 /286.38 90.09 / 282.38 90.17 Ii 278.38 90.20 276.77 90.2 276.77 290.67 290.12 289.57 289.26 289.26 276.77 276.77 277.07 281.00 TVD ft 3969.22 3972.99 3980.70 3962.20 3959.30 3958.86 3958.00 3959.30 3960.82 3983.78 3984.30 3984.04 3954.30 3903.55 3897.77 3892.90 3892.06 3890.00 3890.00 3889.91 3889.69 3889.56 3889.36 3889.02 3888.70 3888.68 3890.00 BP Planning Report +N/-S ft 766.71 154.62 -128.50 129.92 483.82 . Date: 4/19/2004 Time: 09:03:38 Co-ordiaate(NE) Referenee: Well: Plan MPI-11 Tho Ver1ieal (TVD) Referenee: 69.3 RKB(34.3 + Section (VS) Reference: Well (O.DON,O.OOE Survey CaleuIation Method: Minimum Curvatu~ +EI-W ft -6211.98 -2897.83 -1732.65 -1644.85 -2776.53 942.74 -6068.74 399.84 -3212.16 549.48 -4166.24 +N/+S ft 114.76 121.70 163.38 268.81 300.00 352.61 382.24 399.84 409.48 535.14 549.48 552.83 942.74 141.48 150.18 158.67 163.38 175.18 208.11 241.05 268.81 273.94 300.00 304.43 329.26 347.29 352.61 359.64 371.43 382.24 383.23 399.84 FlW ft -2073.63 -2074.00 -2092.00 -2096.57 -2119.56 -2142.79 -2166.19 -2189.70 -2203.06 -2236.82 -2331.06 -2425.31 -2504.76 -2519.57 -2600.00 -2614.77 -2711.61 -2809.95 -2849.99 -2909.18 -3008.49 -3099.63 -3107.79 -3212.16 Map Map Northing Easting ft ft 6010163.00 545573.00 6009574.00 548891.00 6009299.00 550058. 6009558.00 5501 . 0 6009904.00 549 .00 26 19.035 N 26 13.035 N 26 10.254 N 26 12.796 N 26 16.273 N 1 <- Longitude -> Beg Min See 149 37 42.234 W 149 36 4.953 W 149 35 30.754 W 149 3528.179 W 149 36 1.397 W 70 2620.767 N 149 37 38.034 W 70 26 15.445 N 149 36 14.181 W 70 2616.912 N 149 3642.186 W LS Build Tura 1100ft degl100ft degl100ft 0.00 0.00 0.00 12.00 1.09 12.17 12.00 11.80 -2.21 0.00 0.00 0.00 4.00 -3.30 -2.26 4.00 0.08 -4.00 0.00 0.00 0.00 4.00 -1.49 3.71 4.00 -0.16 -4.00 0.00 0.00 0.00 4.00 2.96 2.69 4.00 0.00 4.00 0.00 0.00 0.00 TFO deg 0.00 85.00 -10.71 0.00 -145.63 -88.90 0.00 111.86 -92.39 0.00 42.24 89.99 0.00 Target LLEW ft 522.71 523.08 541.09 545.65 568.64 591.87 615.27 638.78 652.14 685.90 780.15 874.39 953.84 968.65 1049.08 1063.85 1160.69 1259.04 1299.08 1358.27 1457.57 1548.71 1556.87 1661.24 MPI-17L1 T1.2 MPI-17 L 1 T2.2 MPI-17 L 1 T3.2 UNS ft -1155.95 -1156.08 -1162.89 -1164.72 -1173.78 ToolICommeat MWD+IFR+MS TSBB- Top OB MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS -1182.67 MWD+IFR+MS -1191.37 MWD+IFR+MS -1199.86 MWD+IFR+MS -1204.57 MWD+IFR+MS -1216.37 MWD+IFR+MS -1249.30 MWD+IFR+MS -1282.24 MWD+IFR+MS -1310.00 MWD+IFR+MS -1315.13 MWD+IFR+MS -1341.19 MWD+IFR+MS -1345.62 MWD+IFR+MS -1370.45 MWD+IFR+MS -1388.47 MWD+IFR+MS -1393.80 MWD+IFR+MS -1400.83 MWD+IFR+MS -1412.61 MWD+IFR+MS -1423.43 MWD+IFR+MS -1424.42 MWD+IFR+MS -1441.02 MPI-17 L1 T1.2 -. . . BP Planning Report Survey 6361.97 88.41 278.75 3891.52 409.48 -3267.55 1716.63 -1450.67 6400.00 88.41 278.75 3892.58 415.26 -3305.13 1754.21 +IFR+MS 6500.00 88.41 278.75 3895.35 430.47 -3403.93 1853.01 D+IFR+MS 6600.00 88.41 278.75 3898.13 445.68 -3502.72 1951.80 WD+IFR+MS 6700.00 88.41 278.75 3900.91 460.89 -3601.52 2050.60 MWD+IFR+MS 6800.00 88.41 278.75 3903.69 476.10 -3700.32 2149.40 MWD+IFR+MS 6900.00 88.41 278.75 3906.47 491.30 -3799.12 MWD+IFR+MS 7000.00 88.41 278.75 3909.25 506.51 -3897.91 MWD+IFR+MS 7100.00 88.41 278.75 3912.03 521.72 -3996.71 MWD+IFR+MS 7188.20 88.41 278.75 3914.48 535.14 -4083.85 MWD+IFR+MS 7200.00 88.76 279.07 3914.78 536.96 -4095.50 MWD+IFR+MS 7271.84 90.88 281.00 3915.00 549.48 -4166.24 -1590.67 MPI-17 L1 T2.2 7288.89 90.88 281.68 3914.74 552.83 -4182.95 -1594.02 MWD+IFR+MS 7300.00 90.88 281.68 3914.57 555.08 -4193.83 -1596.27 MWD+IFR+MS 7400.00 90.88 281.68 3913.02 575.33 -4291.75 -1616.51 MWD+IFR+MS 7500.00 90.88 281.68 3911.48 595.57 -4389.67 -1636.76 MWD+IFR+MS 7600.00 90.88 281.68 3909.93 615.82 2936.66 -1657.01 MWD+IFR+MS 7700.00 90.88 281.68 3908.39 636.06 3034.58 -1677.25 MWD+IFR+MS 7800.00 90.88 281.68 3906.85 656.31 3132.50 -1697.50 MWD+IFR+MS 7900.00 90.88 281.68 3905.30 676.55 3230.41 -1717.74 MWD+IFR+MS 8000.00 90.88 281.68 3903.76 696.80 3328.33 -1737.99 MWD+IFR+MS 8100.00 90.88 281.68 3902.21 3426.25 -1758.23 MWD+IFR+MS 8200.00 90.88 281.68 3900.67 3524.17 -1778.48 MWD+IFR+MS 8300.00 90.88 281.68 3899.12 3622.08 -1798.72 MWD+IFR+MS 8400.00 90.88 281.68 3897.58 3720.00 -1818.97 MWD+IFR+MS 8500.00 90.88 281.68 3896.04 3817.92 -1839.21 MWD+IFR+MS 8600.00 90.88 281.68 3894.49 -5466.75 3915.83 -1859.46 MWD+IFR+MS 8700.00 90.88 281.68 3892.95 -5564.67 4013.75 -1879.70 MWD+IFR+MS 8800.00 90.88 281.68 3891.40 -5662.59 4111.67 -1899.95 MWD+IFR+MS 8900.00 90.88 281.68 3889.86 -5760.50 4209.58 -1920.20 MWD+IFR+MS 9000.00 90.88 281.68 3888.32 -5858.42 4307.50 -1940.44 MWD+IFR+MS 9100.00 90.88 281.68 919.50 -5956.34 4405.42 -1960.69 MWD+IFR+MS 9200.00 90.88 281.68 939.74 -6054.25 4503.34 -1980.93 MWD+IFR+MS 9214.00 90.88 281.68 942.58 -6067.96 4517.04 -1983.77 4 1/2" 9214.79 90.88 281.68 942.74 -6068.74 4517.82 -1983.93 MPI-17 L 1 T3.2 I 49 J6 00 I 49 40 00 \II \If 00 49 \If PU 1-17L 1 PTD 204 99 6/9/2004 SFD Subject: MPI-17 Motherbor&ti-Collision From: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Date: Thu, 17 Jun200411:14:35 -0800 To: tOID_rnaunder@admin.state.ak.us . See attached summary report and travelling cylinders for all three wellbores. «MPI-17 Mother Bore Anti-Collision Report.pdf» «Mother bore & NB Travelling Cylinders.pdt» «OA Lateral Travelling Cylinders.pdt» «OB Lateral Travelling Cylinders.pdt» SRjp Coyner ~~_!!~. Energy BervI-. 907-564-4395 BPXA 907-748-3689 cell !MPI-17 Mother Bore Anti-Collision Content-Type: Content-Encoding: MPI -17 Mother Bore Content-Description: Anti-Collision Report.pdf application/octet-stream base64 .. Mother bore & NB Content-DescnptlOn: T 11' C 1· d df rave Illg y III ers.p Mother bore & NB Travelling Cylinders.pdf C t t T 1· t· n/ t t tr on en - ype: app lca 10 oc e -s earn Content-Encoding: base64 Lateral Travelling Content-Type: Content-Encoding: C t t D . t· . OA Lateral Travelling on en - escnp Ion. C 1· d df Y III ers.p application/octet -stream base64 ...._m.......... .... .. . _ ________ ....._.......m....... ......... . Lateral Travelling Content-Description: OB Lateral Travelling Cylinders.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 6/17/200412:16 PM RE: MPI-17 Multi-Lateral APD's . . Subject: RE: MPI-17 Multi-Lateral APD's From: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Date: Wed, 16Jun200417:l7:11-0800 To: Thomas Maunder <tom_maunder@admin.state.ak.us> Since everybody (including me) likes seeing the ASP's, it would be best to replace the originals with the "ASP" versions don't you think? Please make the switch. Skjp Coyner 907-564-4395 BPXA 907-748-3689 cell -----Original Message----- From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Wednesday, June 16, 2004 4:49 PM To: Coyner, Skip (NATCHIQ) Subject: Re: MPI-17 Multi-Lateral APD's Skip, I am getting back to the 1-17 family. Should these directional plans be substituted for those that were included in the original applications?? Tom Coyner, Skip (NA TCHIQ) wrote: OK, we have the various Sperry wellplans sorted out and converted to ASP's. For somr reason, the common BHL (ASP's) moved 42.5 ft and all three lateral "entry points" moved a little as well. It seems like there was a minute azimuth change somewhere in the Compass program, but again, we're all on the same page now. I have attached all three well plans along with the front (data) sheet from the program. The revised data sheet has all necessary corrections on it: a) entry points, b) common BHL and c) lVD of the NB lateral. Let me know if you need anything else. «L2 asps.pdf» «1-17 asps.pdf» «L 1 asps.pdt» «MPI-17 Data Sheet revisedZIP» Skjp Coyner .~. ' . ABR. C. Energy Service. ?1It' .... 1'_ ~_. ., 907-564-4395 BPXA 907-748-3689 cell I of 1 6/17/20047:10 AM A'-"--#. ............. ....,... ..rr......___a~a... ..~a _._______ ._ _ _ ___ . . Subject: RE: MPI-17, Application for Pennit to Drill From: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Date: Thu, 10 Jun 2004 16:03:01 -0800 To: Thomas Maunder <tom_maunder@admin.state.ak.us> Roger that. Skip Coyner 907-564-4395 BPXA 907-748-3689 cell -----Original Message----- From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Thursday, June 10, 2004 3:59 PM To: Coyner, Skip (NATCHIQ) Subject: Re: MPI-17, Application for Permit to Drill Thanks Skip. I am glad you place. Whole Tom I will await the new zips. are aware of 1-10. You'll at least have a stack in lot more options. Coyner, Skip (NATCHIQ) wrote: First, I found a bunch of bugs in the Sperry wellplans with asp's that I sent you. So, throw them away. We're working on getting everyone on the same page. I'll re-send them when they are correct. Things just aren't the same since Ken Alan switched jobs. MPI-17 etal will be in hydraulic unit 3 along with the dreaded MPI-IO. Since MPI-10 killed us a few years back, MPU has reduced their injection rates and pressures. Furthermore, 1-10 will not be injecting while we're drilling. I was still here at BP when Steve Shultz took the kick a couple of years ago. So I am familiar with the incident. We believe that the fault block (hydraulic unit) is no longer over pressured -although we do list pore pressures at 9.1 ppg. We will be at > 9.4 ppg and drilling carefully. Skip Coyner 907-564-4395 BPXA 907-748-3689 cell 1 of] 6/17/200410:18 AM .............. ..."'.a..a...I. ... I, ¿ ...pp...........""'................ ............ ... ..................... ...... .................... . . Subject: Re: MPI-17, Application for Pennit to Drill From: Thomas Maunder <tom _ maunder@admin.state.ak.us> Date: Thu, 10 Jun 2004 14:22:36 -0800 To: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Well, I did ask for it all. Aren't zip files grand?? On the possible communication from 1-10 to 1-13, I realize the path is tortuous, but in the information I remember seeing on the pressure fall-off test there was a doubling of the derivative slope that indicated communication to something with a large porosity. The speculation was a fault and all that was needed to confirm it was allowing to pressure to continue to decline to some calculated value. There was even a time prediction of when the pressure would be reached. What HU(s) are the proposed 1-17 family in?? Tom Coyner, Skip (NATCHIQ) wrote: Here you go. Question: . . .. is there any plan to cover these faults?? Answer: Yes, the planned TOC will be 500' above TUCZ - ± 3100'MD Question: You state that the pressure situation has been rectified, how has this been done?? Answer All surrounding injectors in adjacent Hydraulic Units will be shut-in while drilling. Question: Do the reservoir engineers and geologists see communication between the various wells (I-II, I-11L1, 1-10 and 1-08) in the area or are they compartmentalized?? Answer: MPI-12, MPI-11, and MPI-13 are geologically isolated from MPI-08 and MPI-10i ("i" denotes an injector). MPI-12, MPI-11, and MPI-13i are in Hydraulic Unit 13, MPI-10i in HU 3, and MPI-08 in HU 2. This isolation is determined by two large faults (-100-300' displacement) traveling North-South and East-West. This also confirmed with different oil API between HU 13 and HU 3. In addition, pressure transient analysis in MPI-12 have determined that this well is in a very small compartment and not communicating to even to MPH-13. This has explained the poor performance of MPI-12. Finally, we have not seen any pressure indication in MPI-12 or MPI-08 since MPI-10i was put back on injection. Question: Close approach issues. Please submit the data. A traveling cylinder plot would be appreciated as part of this. Answer: See attachments. Question: I remember some pressure fall-off tests being done on possibly MPI-10 that may have indicated that the water was communicating via a fault. Was a report ever issued on that testing?? Answer: There was no formal report written on that PTA, but the test did indicate fracture a of 408' right after a high injection period (-3000 bwpd). This fracture was reduced to 75' after a period of lower injection (-1000 bwpd). This lower injection rate has been continued since then. Even during the high injection, it is highly unlikely that MPI-10i was communicating to MPI-12 due to the 2000' feet of tortuous lof2 6/17/200410:18 AM ......-. .......~ ~ ~., ~ -rr--------- --- - ------ distance between wells~ . Question: In the directional planning information, the positions (x,y) of the formation tops and casing points are not given. Would you please supply complete listings?? Answer: See attachments: Skip Coyner 907-564-4395 BPXA 907-748-3689 cell 20f2 6/17/200410:18 AM . . PERMIT TO DRILL 20 MC 25.005 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary wellbore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ¡J1Ptf '1,-/7L! PTD# L// Development Service CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL [/ (If API number last two (2) digits are between 60-69) ZL)tj ~é~ Qy Exploration Stratigraphic ~'CLUEn Tbe permit is for a new we~lbore segment of ! existing wen /7/4-/ X - ¡ 7 . Permit No,26V£$API No. !:Z;--D27.- 2321 2..-Dð Production sbould continue to be reported as a function· of tbe original API number. stated above. BOLE In accordance witb 20 AAC 25.005(1), aU records, data and logs acquired for tbe pilot bole must be dearly differentiated In botb name (name on permit plus PH) and API Dumber (SO 70/80) from records, data and logs acquired for we)) (name on permit). Pll..OT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Tbe permit is approved subject ·to fuD compliance with 20 AAC 25.0SS~ Approval to perforate and produce is contingent upon issuance of II conservation order approving a spacing exception. (Company Name) assumes tbe liability of any protest to tbe spacinge:Jception tbat may occur. All dry ditcb sample sets submitted to tbe Commission must be in no greater -tban 30' sample inten'als from below tbe permafrost or from wbere samples are first caugbt and 10' sample intervals tbrougb target zones. /Jr5 Geologic Commissioner: Date: c(17/9-- Engineering Commissioner: "".,~ p'og'", "',."' ["'PI·-~E if~f Date Appr SFD Date 6/9/2004 35 36 37 38 39 _SeabedconditiolJ $urvey Contact narnelphoneJor if off-shore) Ye$ Ye$ NA _NA NA ~d_er 61uff re$ervojr$ "~'_, _n,,,_be _drilled wjtb 9.4 ~ " , pressuœd sand$ due to _offset iniector$ ha\le been reduced 10_ normal pœss_ure_ SeeJ)riJling Ha:z;ard_s& ContingelJcies_section of application. Sei$mic_analysjs_ of sbaJlow gas_zones_ Permit _D_ata_preselJted on pote_ntial overpres_sure _ZOne$ 6~,_6l9J04; NoH2Sknown Expected reservoir pre_ssure i$ _9. ppg E~"^" ,>,:11 -Pad. n 6 ppg mud. Previousl}' over 6~,_6-9-04). (S. Coyner, Geology Appr Date TEM 6/17/2004 .Cf!ìVJ l\~ 21 22 23 24 25 26 27 28 29 30 31 32 33 34 can be issued wlo hydrogen sulfide meas_ures Work will occur withoutoperatjon _shutdown Js presence of H2S gas_ probable Mecba_nicaLCOlJdjtion of wells within AOR verified (Forß_ervjce welJ only) Choke manifold compJies w/APtR~-53 (May 64) _BOPEs,_d_oJhey meetreguJation BOPEpres$ ratilJg appropriate;_test to_(pu_t psig in_commentS) _DriUilJg fluid program $chematic_& e~uip istadequate Jtdiverter required, does _Adequate JfaJe-drilL has_a_ to:403 Adequate we!lbore sep~lration _proposed ¡tmeet reguJations_ for abandOnment beelJ approved C, tan_kage_or reser:ve pit _CMT will coyeraJl _C_a$ilJg designs ad_equaJe for _ T" B _&_ permafrost known _pro_ductiye horizon_s _CMT v_ol adeq u_ate_ to _CMT v_ol adequ_ate_ to çirc!Jlate oncOnduçtor tie-in long _string to_sur:f csg_ 18 19 20 8< su_rfcsg Yes NA Yes No_ No_ Yes Ye$ NA Yes NA Ye$ Ye$ Yes Ye$ No No NA Skip Coyner, MASI=' çalcuJate_d_at 875 psi. Planne_d_B_QP_ test pressure 3000 psi., Maximum possibleBHP9, I='ro~imity- analysis pertorme_d 601=' wiJI_alrea_dy be in place. tEMW. Planne_d_MW ~A_-9.6p-pg. Ç!oses_t wel! is motherÞore 'ab_ove" thjs_ segment._ Wa_steJo an approved disposal we I!. Rig is_equipped_with steeLpjts. No reseJ\le_pjtplanned, tntermedjate_ Slotted ilJer _completion plalJned._ I lerbo !Io""" ~v ""1_:1_' j47_. I_O~ Surfaçe casing cementedJo su_rface_ ilJ motherþore, cement MI='I:17, planned to çover any _hydrocarbOIJ zones. aq_uifers exempto" An 1""'1:1 7 · 0'~(b)(3). Engineering Appr SFD . 6/9/2004 Date PTD#: 2040990 Administration Company BP EXPLOI ~ -ASKA) Permitfee atta _Lease _number _~...",' "",'., "'''_ _U_nique weltn_ame_and lJumb_er located 12 13 14 15 16 17 2 3 4 5 6 7 8 9 10 11 _S_ur:face _casing_ protects alLknown_ USDWs _C_Ondu_ct9r string_provided _AÇMP_Findjng 9f Con_sistency_h_a$ bee_njssued for_this proieçt All welJs_ within Jl4Jmle_are_a_of review jdelJtified (For servjce-,,~e!l Onl}') Pre-produced injector; duration of pre-production le$s than 3 mOntbs_ (Forser:vice well only) Can permit Well located within area and strata authorized by_lnjectiolJ Order # {put 10# Permit can be issued witbout co_nservaJion order Permit can be issued witbout ad_milJistrati\leapprovaJ 15-day wait Operator onl}' affected party _Oper_ator has_appropriate_ bond in Jorce _S_uffiçient Jfdeviated. js_ weJlbore platinclu_ded from from other welJs açreageayailable indrilliIJ9 unjt Well Well Well located proper distance located proper _distance_ driJlinQ unit bound_ary_ Field & Pool ina d_efined pool .."nnr^nrir''''ðt, be approved before in_ comments) (For MILNE POINT, SCHRADER BLFF OIL NC 525140 nitial ClasslType Yes Yes _Yes Ye$ Ye$ Yes Yes Ye$ _Yes _Yes Yes Yes Yes NA NA NA NA Conductorwa$ set AI! Mpi-j WelJ driJled from exjsJilJg pad. from the exterior Nearby offset welJ 1-06, 1-08, I-tO" l-t 1 H3_h_a$ never been perforated 8< 1-1 tL1 are_open to Jhe_pool itisnoJ ope_nJo the pool.Tbe_ otber nearby_offsetwelJs_ in the OB_sand" butnotilJ se_ctio_ns. the same qtr-qtr-qtr boundal)' oftbeaffected area of_C_Q 477._ Bluff Oil 1 O-acre spa_cing çonforming to goyernmental qtr-qtr-qtr sections_and moreJba-"-500' -17:Ljconforms to these re~uireme_nts, ThiS mulit-lateral CO ~n specifies only DEV Well PEND will produceJrom_ the 06-sand_of theSçbrader Name: MILNE PT UNIT SB 1-17L 1 GeoArea 890 Unit Multi-lateral producer inO_B_Schrader _Bluffsand_: Top_productive inteNal and TPJn ADL 025517 11328 fee_not required Program DEV On/Off Shore POOI;_ goYeroedbyCO~ n. On Well Annular Disposal bore seg ~ o e e Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . Sperry-Sun Drilling Services LIS Scan Utility . J-ocf -(tJ-O $Revision: 3 $ LisLib $Revision: 4 $ Fri Sep 03 15:29:03 2004 1;2 77c.( Reel Header Service name... ......... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name..... ..UNKNOWN Comments............ ... ..STS LIS Writing Library. Scientific Technical Services Tape Header Service name........... ..LISTPE Date.................... .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name...... ......... . UNKNOWN Continuation Number..... .01 Previous Tape Name.. .....UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPI-17 L1 PB1 500292321270 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 03-SEP-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003171003 T. MCGUIRE D. GREEN MWD RUN 2 MW0003171003 C.A. DEMOSKI E. VAUGHN MWD RUN 3 MW0003171003 C.A. DEMOSKI E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 MW0003171003 C.A. DEMOSKI E. VAUGHN MWD RUN 6 MW0003171003 C.A. DEMOSKI E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 33 13N 10E 2323 3581 .00 68.35 34.60 ..... RECEIVED SEP 'j .: 2004 NéJska. Oi&GasCons.~¡( ~ncnorage # WELL CASING RECORD OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING . BIT SIZE (IN) 13.500 9.875 6.750 SIZE (IN) 20.000 10.750 7.625 DEPTH (FT) 114.0 2378.0 5053.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 5 WAS DIRECTIONAL ONLY TO POSITION THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE WHIPSTOCK WAS AT 5053'MD/3947'TVD AND THE BOTTOM WAS AT 5065'MD/3949'TVD, WITHIN THE RUN 3 INTERVAL OF MPI-17. ONLY SROP DATA ARE PRESENTED FOR RUN 5. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUNS 2, 3, 6 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM K. COONEY (SIS/BP), DATED 8/24/04, QUOTING AUTHORIZATION FROM MIKIE SMITH (BP GEOLOGIST). MWD DATA ARE CONSIDERED PDC. LATERAL AND PLUG BACK WELLBORES WERE SHIFTED/CORRECTED TO THE MAIN MPI-17 WELLBORE. 7. MWD RUNS 1 - 3, 5, 6 REPRESENT WELL MPI-17 L1 PB1 WITH API#: 50-029-23212-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7746'MD/ 3932'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS. $ File Header Service name... ......... .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record . . FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 267.0 312.0 2343.5 2343.5 2343.5 2343.5 2343.5 STOP DEPTH 7682.5 7740.5 7689.5 7689.5 7689.5 7689.5 7689.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 267.0 2388.0 MWD 2 2388.0 4183.0 MWD 3 4183.0 5053.0 MWD 5 5053.5 5077 . 0 MWD 6 5077 . 0 7746.5 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..... ........... ..0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.... .... ...Feet Data Reference Point............. . Undefined Frame Spacing..... ..... .......... .60 .1IN Max frames per record........ .....Undefined Absent value. .... ...... .......... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 267 7740.5 4003.75 14948 267 7740.5 ROP MWD FT/H 0.55 1068.52 219.825 14858 312 7740.5 GR MWD API 10.62 141.07 70.8428 14832 267 7682.5 RPX MWD OHMM 2.04 673.71 15.2619 10693 2343.5 7689.5 RPS MWD OHMM 2.24 1608.59 15.993 10693 2343.5 7689.5 RPM MWD OHMM 0.43 2000 16.9872 10693 2343.5 7689.5 RPD MWD OHMM 0.25 2000 22.5729 10693 2343.5 7689.5 FET MWD HOUR . 0.09 35.88 0.931076 10693 ~343.5 7689.5 First Reading For Entire File......... .267 Last Reading For Entire File....... ....7740.5 File Trailer Service name....... ......STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.. ... ..04/09/03 Maximum Physical Record. .65535 File Type.............. ..LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name........... ..STSLIB.002 Service Sub Level Name... Version Number..... .... ..1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............ ....LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 267.0 312.0 STOP DEPTH 2388.0 2388.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 13-JUL-04 Insite 66.37 Memory 2388.0 312.0 2388.0 5.5 13.8 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY TOOL NUMBER 61497 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13.500 .0 # BOREHOLE CONDITIONS MUD TYPE: SPUD MUD . MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... ..... ........ ..0 Data Specification Block Type... ..0 Logging Direction. .... .......... ..Down Optical log depth units......... ..Feet Data Reference Point.. ........... .Undefined Frame Spacing.. .................. .60 .1IN Max frames per record............ .Undefined Absent value... .................. .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units FT FT/H API Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code 9.30 75.0 8.5 500 10.8 . .000 .000 .000 .000 .0 77.0 .0 .0 Offset o 4 8 Channel 1 2 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 267 2388 1327.5 4243 267 2388 ROP MWD010 FT/H 0.55 892.46 181. 728 4153 312 2388 GR MWD010 API 24.32 118.92 65.8669 4243 267 2388 First Reading For Entire File......... .267 Last Reading For Entire File.......... .2388 File Trailer Service name....... ..... .STSLIB.002 Service Sub Level Name... Version Number... ..... ...1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type.. ............. .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name. ........... .STSLIB.003 Service Sub Level Name... . version Number.......... .1.0.0 Date of Generation.... ...04/09/03 Maximum Physical Record. .65535 File Type............. ...LO Previous File Name... ... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 3 . header data for each bit run in separate files. 2 .5000 START DEPTH 2343.5 2343.5 2343.5 2343.5 2343.5 2388.5 2388.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ STOP DEPTH 4138.5 4138.5 4138.5 4138.5 4138.5 4146.0 4183.0 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTRO MAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): 15-JUL-04 Insite 66.37 Memory 4183.0 2388.0 4183.0 13.6 55.4 TOOL NUMBER 053519 134758 9.875 2378.0 LSND 9.40 51.0 9.5 640 6.6 2.600 1.800 2.200 3.000 65.0 97.0 65.0 65.0 . . EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... ..... ..........0 Data Specification Block Type... ..0 Logging Direction................ . Down Optical log depth units. ........ ..Feet Data Reference Point........ ......Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value........... .......... .-999 Depth units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2343.5 4183 3263.25 3680 2343.5 4183 ROP MWD020 FT/H 19.35 1068.52 250.923 3590 2388.5 4183 GR MWD020 API 10.62 118.89 65.0636 3516 2388.5 4146 RPX MWD020 OHMM 2.04 673.71 14.4059 3591 2343.5 4138.5 RPS MWD020 OHMM 2.24 678.65 15.3905 3591 2343.5 4138.5 RPM MWD020 OHMM 2.07 2000 18.132 3591 2343.5 4138.5 RPD MWD020 OHMM 0.25 2000 32.6395 3591 2343.5 4138.5 FET MWD020 HOUR 0.09 35.88 1.46318 3591 2343.5 4138.5 First Reading For Entire File......... .2343.5 Last Reading For Entire File.......... .4183 File Trailer Service name. ........... .STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation... ....04/09/03 Maximum Physical Record. .65535 File Type...... ......... .LO Next File Name..... ..... .STSLIB.004 Physical EOF File Header Service name........... ..STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type.............. ..LO Previous File Name..... ..STSLIB.003 Comment Record . FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 4 . header data for each bit run in separate files. 3 .5000 START DEPTH 4139.0 4139.0 4139.0 4139.0 4139.0 4146.5 4183.5 STOP DEPTH 5053.0 5053.0 5053.0 5053.0 5053.0 5053.0 5053.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type....... ......... ..0 16-JUL-04 Insite 66.37 Memory 5053.0 4183.0 5053.0 56.5 107.9 TOOL NUMBER 053519 134758 9.875 2378.0 LSND 9.50 57.0 9.5 600 5.8 3.800 2.320 3.500 4.000 62.0 105.8 62.0 62.0 . Data Specification Block Type. ....0 Logging Direction................ . Down Optical log depth units......... ..Feet Data Reference Point............. . Undefined Frame Spacing...... ...... ....... ..60 .1IN Max frames per record............ . Undefined Absent value.............. ...... ..-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4139 5053 4596 1829 4139 5053 ROP MWD030 FT/H 4.3 354.88 155.472 1740 4183.5 5053 GR MWD030 API 32.47 117.76 79.1284 1814 4146.5 5053 RPX MWD030 OHMM 4.12 145.69 16.5087 1829 4139 5053 RPS MWD030 OHMM 4.21 167.99 17.5149 1829 4139 5053 RPM MWD030 OHMM 4.46 230.55 19.2747 1829 4139 5053 RPD MWD030 OHMM 4.65 198.17 19.7132 1829 4139 5053 FET MWD030 HOUR 0.24 9.26 1.00403 1829 4139 5053 First Reading For Entire File......... .4139 Last Reading For Entire File....... ... .5053 File Trailer Service name... ......... .STSLIB.004 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............ ....LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # 5 header data for each bit run in separate files. 5 .5000 . FILE SUMMARY VENDOR TOOL CODE START DEPTH ROP 5053.5 $ STOP DEPTH 5077.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..... ..... ........0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing..... ..... .......... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD050 . 2l-JUL-04 Insite 66.37 Memory 5077 . 0 5053.0 5077.0 .0 .0 TOOL NUMBER 6.750 5053.0 .00 .0 .0 o .0 .000 .000 .000 .000 .0 .0 .0 .0 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 . . First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5053.5 5077 5065.25 48 5053.5 5077 ROP MWD050 FT/H 0.43 16.41 8.34854 48 5053.5 5077 First Reading For Entire File......... .5053.5 Last Reading For Entire File....... ....5077 File Trailer Service name............ .STSLIB.005 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type.......... .... ..LO Next File Name...... .... .STSLIB.006 Physical EOF File Header Service name.... ........ .STSLIB.006 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type............... .LO Previous File Name..... ..STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 6 header data for each bit run in separate files. 6 .5000 START DEPTH 5020.0 5026.5 5026.5 5026.5 5026.5 5026.5 5077.5 STOP DEPTH 7688.5 7695.5 7695.5 7695.5 7695.5 7695.5 7746.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 23-JUL-04 Insite 66.37 Memory 7747.0 5077.0 7747.0 78.3 94.8 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR EWR4 $ . DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type................ ..0 Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units... ....... .Feet Data Reference Point...... ...... ..Undefined Frame Spacing................. ....60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 129046 162742 . 6.750 5053.0 Oil Based 9.60 99.0 .0 31000 .0 .000 .000 .000 .000 .0 .0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 RPX MWD060 OHMM 4 1 68 12 4 RPS MWD060 OHMM 4 1 68 16 5 RPM MWD060 OHMM 4 1 68 20 6 RPD MWD060 OHMM 4 1 68 24 7 FET MWD060 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5020 7746.5 6383.25 5454 5020 7746.5 ROP MWD060 FT/H 3.99 600.48 250.938 5339 5077.5 7746.5 GR MWD060 API 38.62 141.07 75.6825 5338 5020 7688.5 RPX MWD060 OHMM 1. 81 2000 18.6091 5339 5026.5 7695.5 RPS MWD060 OHMM 2.32 2000 19.3692 5339 5026.5 7695.5 RPM MWD060 OHMM 0.31 2000 23.5643 5339 5026.5 7695.5 RPD MWD060 OHMM 0.18 2000 24.9585 5339 5026.5 7695.5 FET MWD060 HOUR 0.14 156.69 2.23708 5339 5026.5 7695.5 . First Reading For Entire File......... .5020 Last Reading For Entire File.......... .7746.5 . File Trailer Service name... ......... .STSLIB.006 Service Sub Level Name... Version Number.... ..... ..1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type.. ..... ....... ..LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name. ........... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.............. ..UNKNOWN Continuation Number.... ..01 Next Tape Name.......... . UNKNOWN Comments............ .....STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number.... ..01 Next Reel Name.......... . UNKNOWN Comments.......... ..... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File . Sperry-Sun Drilling Services LIS Scan Utility . ¿ilo'f-o ~? $Revision: 3 $ LisLib $Revision: 4 $ Fri Sep 03 15:13:54 2004 }'ìv711 Reel Header Service name......... ....LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name......... ..... ..UNKNOWN Continuation Number.. ....01 Previous Reel Name...... . UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name. .... ..UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPI-17 L1 500292321260 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 03-SEP-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003171003 T. MCGUIRE D. GREEN MWD RUN 2 MW0003171003 C.A. DEMOSKI E. VAUGHN MWD RUN 3 MW0003171003 C.A. DEMOSKI E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 5 MW0003171003 C.A. DEMOSKI E. VAUGHN MWD RUN 6 MW0003171003 C.A. DEMOSKI E. VAUGHN MWD RUN 7 MW0003171003 C.A. DEMOSKI E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 33 13N 10E 2323 3581 68.35 34.60 RECEIVED OPEN HOLE CASING DRILLERS SEP "j " 2004 ......(I&Gasc..Q.D,i~.~ w... # WELL CASING RECORD . 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING . BIT SIZE (IN) 13.500 9.875 6.750 SIZE (IN) 20.000 10.750 7.625 DEPTH (FT) 114.0 2378.0 5053.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 5 WAS DIRECTIONAL ONLY TO POSITION THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE WHIPSTOCK WAS AT 5053'MD/3947'TVD AND THE BOTTOM WAS AT 5065'MD/3949'TVD, WITHIN THE RUN 3 INTERVAL OF MPI-17. ONLY SROP DATA ARE PRESENTED FOR RUN 5. 4. MPI-17 L1 IS AN OPENHOLE SIDETRACK, EXITING THE MPI-17 L1 PB1 WELLBORE AT 7462'MD/3950'TVD WITHIN THE RUN 6 INTERVAL. 5. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 6. MWD RUNS 2, 3, 6, 7 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 7. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM K. COONEY (SIS/BP), DATED 8/24/04, QUOTING AUTHORIZATION FROM MIKIE SMITH (BP GEOLOGIST). MWD DATA ARE CONSIDERED PDC. LATERAL AND PLUG BACK WELLBORES WERE SHIFTED/CORRECTED TO THE MAIN MPI-17 WELLBORE. 8. MWD RUNS 1 - 3, 5 - 7 REPRESENT WELL MPI-17 L1 WITH API#: 50-029-23212-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 9260'MD/3943'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS. $ File Header Service name.... ........ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO . Previous File Name...... .STSLIB.OOO . Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves¡ all bit runs merged. .5000 START DEPTH 267.0 312.0 2343.5 2343.5 2343.5 2343.5 2343.5 STOP DEPTH 92 04.0 9262.0 9211.0 9211.0 9211.0 9211.0 9211 . 0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 260.0 2388.0 MWD 2 2388.0 4183.0 MWD 3 4183.0 5053.0 MWD 5 5053.5 5071.0 MWD 6 5071.0 7464.5 MWD 7 7464.5 9262.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type... ............. ..0 Data Specification Block Type... ..0 Logging Direction............ .....Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record.. .......... .Undefined Absent value..... ...... .......... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 267 9262 4764.5 17991 267 9262 ROP MWD FT/H 0.55 1068.52 221. 03 17901 312 9262 GR MWD API 10.62 128.31 70.2558 17875 267 9204 . . RPX MWD OHMM 2.04 673.71 16.5217 13736 2343.5 9211 RPS MWD OHMM 2.24 1608.59 17.1384 13736 2343.5 9211 RPM MWD OHMM 0.43 2000 18.2438 13736 2343.5 9211 RPD MWD OHMM 0.25 2000 22.6043 13736 2343.5 9211 FET MWD HOUR 0.09 35.88 0.822165 13736 2343.5 9211 First Reading For Entire File......... .267 Last Reading For Entire File.......... .9262 File Trailer Service name........ .... .STSLIB.001 Service Sub Level Name... Version Number.. ........ .1.0.0 Date of Generation. ..... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Next File Name......... ..STSLIB.002 Physical EOF File Header Service name........ ." ..STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type............... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP GR $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 260.0 267.0 STOP DEPTH 2388.0 2388.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 13-JUL-04 Insite 66.37 Memory 2388.0 312.0 2388.0 5.5 13.8 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY TOOL NUMBER 61497 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 13 .500 . DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.. ................0 Data Specification Block Type.....O Logging Direction... ............ ..Down Optical log depth units... ...... ..Feet Data Reference Point........ ......Undefined Frame Spacing................. ....60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 units FT FT/H API Nsam Rep 1 68 1 68 1 68 Code Size 4 4 4 . .0 SPUD MUD 9.30 75.0 8.5 500 10.8 .000 .0 .000 77.0 .000 .0 .000 .0 Offset o 4 8 Channel 1 2 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 260 2388 1324 4257 260 2388 ROP MWD010 FT/H 0.55 892.46 180.321 4257 260 2388 GR MWD010 API 24.32 118.92 65.8669 4243 267 2388 First Reading For Entire File..... .... .260 Last Reading For Entire File.......... .2388 File Trailer Service name........... ..STSLIB.002 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type.......... .... ..LO Next File Name......... ..STSLIB.003 Physical EOF . File Header Service name... ......... .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..04/09/03 Maximum Physical Record. .65535 File Type............... .LO Previous File Name..... ..STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPX RPS RPM RPD FET GR ROP $ 3 . header data for each bit run in separate files. 2 .5000 START DEPTH 2343.5 2343.5 2343.5 2343.5 2343.5 2388.5 2388.5 STOP DEPTH 4138.5 4138.5 4138.5 4138.5 4138.5 4146.0 4183.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: 15-JUL-04 Insite 66.37 Memory 4183.0 2388.0 4183.0 13.6 55.4 TOOL NUMBER 053519 134758 9.875 2378.0 LSND 9.40 51. 0 9.5 640 6.6 2.600 1.800 2.200 3.000 65.0 97.0 65.0 65.0 . . MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............. .....0 Data Specification Block Type.. ...0 Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point.... ........ ..Undefined Frame Spacing........ ........... ..60 .1IN Max frames per record.......... ...Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2343.5 4183 3263.25 3680 2343.5 4183 ROP MWD020 FT/H 19.35 1068.52 250.923 3590 2388.5 4183 GR MWD020 API 10.62 118.89 65.0636 3516 2388.5 4146 RPX MWD020 OHMM 2.04 673.71 14.4059 3591 2343.5 4138.5 RPS MWD020 OHMM 2.24 678.65 15.3905 3591 2343.5 4138.5 RPM MWD020 OHMM 2.07 2000 18.132 3591 2343.5 4138.5 RPD MWD020 OHMM 0.25 2000 32.6395 3591 2343.5 4138.5 FET MWD020 HOUR 0.09 35.88 1.46318 3591 2343.5 4138.5 First Reading For Entire File...... ....2343.5 Last Reading For Entire File.... ...... .4183 File Trailer Service name...... ...... .STSLIB.003 Service Sub Level Name... Version Number...... .....1.0.0 Date of Generation.. .., ..04/09/03 Maximum Physical Record. .65535 File Type...... . . . . . . . . . .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.. ........ .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 . File Type.... ........... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP $ 4 . header data for each bit run in separate files. 3 .5000 START DEPTH 4139.0 4139.0 4139.0 4139.0 4139.0 4146.5 4183.5 STOP DEPTH 5053.0 5053.0 5053.0 5053.0 5053.0 5053.0 5053.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB!G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: 16-JUL-04 Insite 66.37 Memory 5053.0 4183.0 5053.0 56.5 107.9 TOOL NUMBER 053519 134758 9.875 2378.0 LSND 9.50 57.0 9.5 600 5.8 3.800 2.320 3.500 4.000 62.0 105.8 62.0 62.0 . . $ # Data Format Specification Record Data Record Type................ ..0 Data Specification Block Type... ..0 Logging Direction............... ..Down Optical log depth units. ........ ..Feet Data Reference Point..... ........ .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value.... ................. .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4139 5053 4596 1829 4139 5053 ROP MWD030 FT/H 4.3 354.88 155.472 1740 4183.5 5053 GR MWD030 API 32.47 117.76 79.1284 1814 4146.5 5053 RPX MWD030 OHMM 4.12 145.69 16.5087 1829 4139 5053 RPS MWD030 OHMM 4.21 167.99 17.5149 1829 4139 5053 RPM MWD030 OHMM 4.46 230.55 19.2747 1829 4139 5053 RPD MWD030 OHMM 4.65 198.17 19.7132 1829 4139 5053 FET MWD030 HOUR 0.24 9.26 1.00403 1829 4139 5053 First Reading For Entire File......... .4139 Last Reading For Entire File.......... .5053 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number..... ... ...1.0.0 Date of Generation... ... .04/09/03 Maximum Physical Record. .65535 File Type.... ........... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number..... ......1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type. .............. .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD header dat~or each bit run in separate fi~. 5 .5000 Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP $ START DEPTH 5053.5 STOP DEPTH 5071.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units........ ...Feet Data Reference Point......... .....Undefined Frame Spacing................... ..60 .1IN Max frames per record.......... ...Undefined Absent value......... ........... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 21-JUL-04 Insite 66.37 Memory 5077 . 0 5053.0 5077 . 0 .0 .0 TOOL NUMBER 6.750 5053.0 .00 .0 .0 o .0 .000 .000 .000 .000 .0 .0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT ROP MWD050 Name Service Unit DEPT FT ROP MWD050 FT/H FT FT/H . 4 4 1 68 1 68 o 4 Max 5071 16.41 Mean 5062.25 9.94528 Nsam 36 36 Min 5053.5 2.64 First Reading For Entire File......... .5053.5 Last Reading For Entire File.......... .5071 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type.. ............. .LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Previous File Name.. .... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD GR RPX RPM FET RPS ROP $ 6 . 1 2 First Reading 5053.5 5053.5 Last Reading 5071 5071 header data for each bit run in separate files. 6 .5000 START DEPTH 5053.5 5053.5 5053.5 5053.5 5053.5 5053.5 5071. 5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: STOP DEPTH 7464.5 7464.5 7464.5 7464.5 7464.5 7464.5 7464.5 23-JUL-04 Insite 66.37 Memory 7462.0 5077.0 7462.0 78.3 . MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type....... ......... ..0 Data Specification Block Type... ..0 Logging Direction...... ......... ..Down Optical log depth units... ...... ..Feet Data Reference Point..... ....... ..Undefined Frame Spacing.. ........ ......... ..60 .1IN Max frames per record........... ..Undefined Absent value.................... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 94.8 . TOOL NUMBER 129046 162742 6.750 5053.0 oil Based 9.60 99.0 .0 31000 .0 .000 .000 .000 .000 .0 116.0 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 RPX MWD060 OHMM 4 1 68 12 4 RPS MWD060 OHMM 4 1 68 16 5 RPM MWD060 OHMM 4 1 68 20 6 RPD MWD060 OHMM 4 1 68 24 7 FET MWD060 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5053.5 7464.5 6259 4823 5053.5 7464.5 ROP MWD060 FT/H 3.99 600.48 245.784 4787 5071. 5 7464.5 GR MWD060 API 38.62 128.31 73.3569 4823 5053.5 7464.5 RPX MWD060 OHMM 2.58 50.73 16.4259 4823 5053.5 7464.5 RPS MWD060 OHMM 2.59 1608.59 16.9277 4823 5053.5 7464.5 RPM MWD060 OHMM 0.43 41. 37 16.4171 4823 5053.5 7464.5 RPD MWD060 OHMM FET MWD060 HOUR . 0.74 0.14 40.43 14.07 17.8077 4823 0.559614 4823 First Reading For Entire File. ........ .5053.5 Last Reading For Entire File..... ..... .7464.5 File Trailer Service name....... ..... .STSLIB.006 service Sub Level Name... Version Number.... ..... ..1.0.0 Date of Generation..... ..04/09/03 Maximum Physical Record..65535 File Type........ ...... ..LO Next File Name... ...... ..STSLIB.007 Physical EOF File Header Service name............ .STSLIB.007 service Sub Level Name. . . Version Number....... ... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type.............. ..LO Previous File Name..... ..STSLIB.006 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR ROP FET $ 7 _053.5 5053.5 7464.5 7464.5 header data for each bit run in separate files. 7 .5000 START DEPTH 7465.0 7465.0 7465.0 7465.0 7465.0 7465.0 7465.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ STOP DEPTH 9211 . 0 9211 . 0 9211.0 9211.0 92 04.0 9262.0 9211.0 24-JUL-04 Insite 66.37 Memory 9260.0 7462.0 9260.0 85.8 95.6 BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 TOOL NUMBER 129046 162742 . # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction........... ......Down Optical log depth units......... ..Feet Data Reference Point............ ..Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value.................. ... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 6.750 5053.0 Oil Based 9.50 80.0 .0 33000 .0 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Service Unit FT MWD070 FT/H MWD070 API MWD070 OHMM MWD070 OHMM MWD070 OHMM MWD070 OHMM MWD070 HOUR Mean 8363.5 237.466 71.9303 18.8359 19.0292 20.3413 20.4245 0.430461 Min 7465 1. 35 45.18 4.74 4.77 5.19 6.62 0.14 Max 9262 476.71 120.27 54.79 51.75 2000 127.41 4.75 First Reading For Entire File......... .7465 Last Reading For Entire File.......... .9262 Nsam 3595 3595 3479 3493 3493 3493 3493 3493 . .0 116.0 .0 .0 First Reading 7465 7465 7465 7465 7465 7465 7465 7465 Last Reading 9262 9262 9204 9211 9211 9211 9211 9211 . . File Trailer Service name.... ....... ..STSLIB.007 Service Sub Level Name... Version Number...... .....1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.008 Physical EOF Tape Trailer Service name............ .LISTPE Date.................... .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name. .,. ........... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments.... ............ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name.... ........ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... ... ........ ..UNKNOWN Continuation Number.... ..01 Next Reel Name.. ....... ..UNKNOWN Comments........ ....... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File