Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout221-103 T R A N S M I T T A LL FROM:Anu Ambatipudi TO: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC 700 G Street 333 W.7 th Ave., Suite 100 Anchorage AK 99501 Anchorage, Alaska RE: WD-03 Permit: 221-103 DATE: 02/12/2026 Transmitted: WD-03 CBL Report Via SFTP Transmittall instructions: please promptly sign, scan, and e-mail to AKGGREDTSupport@ConocoPhillips.onmicrosoft.COM CC: WD-03 - e-transmittal well folder Receipt: Date: Alaska/IT-Data Services |ConocoPhillips Alaska | 221-103 T38306 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2026.02.12 08:22:54 -09'00' TTT RR AA NN SS MM II TT TT AA LL FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl ConocoPhillips Alaska, Inc. AOGCC P.O. Box 100360 330 W. 7 th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage, Alaska 99501 RE: Schlumberger Wireline Backlog – CRU DATE: 12/19/2023 Transmitted: North Slope, Colville River Unit data drophard driveVia CD2-45 50-103-20395-00 201212_CD2-45_Patch_15May2023 CD2-53 50-103-20494-00 204089_CD2-53_LDL_30Nov2022 204089_CD2-53_Patch_14Oct2022 CD3-107 50-103-20529-01 206189_CD3-107_Packer_16Apr2022 CD3-125 50-103-20632-00 210189_CD3-125_LDL_23Feb23 210189_CD3-125_POGLM_03Apr2023 CD3-127 50-103-20634-00 211005_CD3-127_Patch_23Apr2022 211005_CD3-127_PPROF_18Apr2022 CD3-303 50-103-20568-00 208013_CD3-303_CHC_21Feb2023 CD4-499 50-103-20810-00 219161_CD4-499_PPROF_28Sep2023 WD-02 50-103-20285-00 198258_WD-02_WFL_22May2022 WD-03 50-103-20835-00 221103_WD-03_IBC DSLT_12Feb2022 221103_WD-03_USIT_28Feb2022 2 of 2 Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com Receipt: Date: Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512 T38298 T38299 T38300 T38301 T38302 T38303 T38304 T38305 T38306 2/29/2024 WD-03 50-103-20835-00 221103_WD-03_IBC DSLT_12Feb2022 221103_WD-03_USIT_28Feb2022 Kayla Junke Digitally signed by Kayla Junke Date: 2024.02.29 10:46:16 -09'00' DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No Well Log Information: Digital Med/Frmt ReceivedStart Stop OH / CH Comments Log Media Run No Electr Dataset Number Name Interval List of Logs Obtained:GR, RES, DEN, NEU, Acoustic, CBL, Flow Detection NoNo YesMud Log Samples Directional Survey REQUIRED INFORMATION (from Master Well Data/Logs) DATA INFORMATION Log/ Data Type Log Scale DF 4/8/20220 8020 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_ProcessedLog.las 36464ED Digital Data DF 4/8/202211 13 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_C10-C30.las 36464ED Digital Data DF 4/8/20229 9 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_Nanuq.las 36464ED Digital Data DF 4/8/202210 11 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_Qannik.las 36464ED Digital Data DF 4/8/20228 8 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_TD_Alpine.las 36464ED Digital Data DF 4/8/20220 8020 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_ProcessedLog.las 36464ED Digital Data DF 4/8/202211 13 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_C10-C30.las 36464ED Digital Data DF 4/8/20229 9 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_Nanuq.las 36464ED Digital Data DF 4/8/202210 11 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_Qannik.las 36464ED Digital Data DF 4/8/20228 8 Electronic Data Set, Filename: WD- 03_ACX_25MAR22_Stop_TD_Alpine.las 36464ED Digital Data DF 4/8/20222296 3400 Electronic Data Set, Filename: WD- 03_CAST_31MAR22_Field-ProcessedLog-V3.las 36464ED Digital Data DF 4/8/20222296 3400 Electronic Data Set, Filename: WD- 03_CAST_31MAR22_RUN02_Field- ProcessedLog.las 36464ED Digital Data DF 4/8/20220 3559 Electronic Data Set, Filename: WD- 03_RBT_29MAR22_Main-V2.las 36464ED Digital Data Monday, March 20, 2023AOGCCPage 1 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 4/8/2022-4 3392 Electronic Data Set, Filename: WD- 03_TEMP_31MAR22_Baseline.las 36464ED Digital Data DF 4/8/20223384 2300 Electronic Data Set, Filename: WD- 03_TEMP_31MAR22_Pass1.las 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_ACX_25MAR22.pdf36464EDDigital Data DF 4/8/2022 Electronic File: WD-03_ACX_25MAR22_img.tiff36464EDDigital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_ProcessedLog.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_ProcessedLog.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_ProcessedLog_img.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Report_V2.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_C10-C30.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_Nanuq.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_Qannik.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_TD_Alpine.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_ACX_25MAR22.pdf36464EDDigital Data DF 4/8/2022 Electronic File: WD-03_ACX_25MAR22_img.tiff36464EDDigital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_ProcessedLog.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_ProcessedLog.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_ProcessedLog_img.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Report_V2.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_C10-C30.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_Nanuq.dlis 36464ED Digital Data Monday, March 20, 2023AOGCCPage 2 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_Qannik.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_ACX_25MAR22_Stop_TD_Alpine.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_CAST_31MAR22.pdf36464EDDigital Data DF 4/8/2022 Electronic File: WD-03_CAST_31MAR22_Field- ProcessedLog-V3.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_CAST_31MAR22_img.tiff36464EDDigital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_ProcessedLog-V3.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_ProcessedLog-V3_img.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN01- 02_ProcessedLogComparison.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN01- 02_ProcessedLogComparison_img.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN02.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN02_Field- ProcessedLog.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN02_img.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN02_ProcessedLog.pdf 36464ED Digital Data DF 4/8/2022 Electronic File: WD- 03_CAST_31MAR22_RUN02_ProcessedLog_im g.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_RBT_29MAR22_Main- V2.dlis 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_RBT_29MAR22_V2.pdf36464EDDigital Data DF 4/8/2022 Electronic File: WD- 03_RBT_29MAR22_V2_img.tiff 36464ED Digital Data DF 4/8/2022 Electronic File: WD-03_TEMP_31MAR22.pdf36464EDDigital Data Monday, March 20, 2023AOGCCPage 3 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 4/8/2022 Electronic File: WD-03_TEMP_31MAR22_img.tiff36464EDDigital Data DF 5/18/202230 2440 Electronic Data Set, Filename: CPAI_WD- 03_CD1_Drilling Mechanics_Depth_Surface.las 36632ED Digital Data DF 5/18/20222400 7152 Electronic Data Set, Filename: CPAI_WD- 03_CD1_Drilling Mechanics_Depth_Intermediate.las 36632ED Digital Data DF 5/18/20226960 9383 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RM_Drilling_Mecha nics_Depth_Intermediate.las 36632ED Digital Data DF 5/18/2022388 9338 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RM_Drilling_Mecha nics_Depth_Intermediate_POOH Pass.las 36632ED Digital Data DF 5/18/20228998 10637 Electronic Data Set, Filename: CPAI_WD- 03_Drilling_Mechanics_Depth_RM_Production.la s 36632ED Digital Data DF 5/18/2022100 2437 Electronic Data Set, Filename: CPAI_WD- 03_VISION_Res_Depth_RT_TD.las 36632ED Digital Data DF 5/18/20222400 6717 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RT_LAS_Intermedi ate.las 36632ED Digital Data DF 5/18/20222400 9382 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RT_LAS_Intermedi ate.las 36632ED Digital Data DF 5/18/20229050 10636 Electronic Data Set, Filename: CPAI_WD- 03_CD1_VISION_Service_RT_Production_TD.las 36632ED Digital Data DF 5/18/2022-6 2439 Electronic Data Set, Filename: CPAI_WD- 03_CD1_VISION_Resistivity_RM_LAS_Surface.l as 36632ED Digital Data DF 5/18/20222400 7152 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RM_LAS_Intermedi ate_7153ft.las 36632ED Digital Data DF 5/18/20222400 9382 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RM_LAS_Intermedi ate_9383ft.las 36632ED Digital Data DF 5/18/20229250 10636 Electronic Data Set, Filename: CPAI_WD- 03_VISION_Serviec_RM_9250-10636ftMD.las 36632ED Digital Data DF 5/18/202244587 44591 Electronic Data Set, Filename: CPAI_WD- 03_CD1_Drilling Mechanics_Time_Surface.las 36632ED Digital Data Monday, March 20, 2023AOGCCPage 4 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 5/18/202244596 44604 Electronic Data Set, Filename: CPAI_WD- 03_CD1_Drilling_Mechanics_Time_Intermediate.l as 36632ED Digital Data DF 5/18/202244604 44614 Electronic Data Set, Filename: CPAI_WD- 03_CD1_EcoScope_Service_RM_Drilling_Mecha nics_Time_Intermediate.las 36632ED Digital Data DF 5/18/202244622 44627 Electronic Data Set, Filename: CAPI_WD- 03_Drilling_Mechanics_Time_Production.las 36632ED Digital Data DF 5/18/2022100 10637 Electronic Data Set, Filename: CPAI_WD- 03_Drilling_Mechanics_Depth_RM_Composite.la s 36632ED Digital Data DF 5/18/2022100 10637 Electronic Data Set, Filename: CPAI_WD- 03_EcoScope- VISION_Serviec_RM_Composite.las 36632ED Digital Data DF 5/18/2022 Electronic File: WD03_SLB- MLWD_Transmittal.pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Resistivity_RM_DLIS_Surface. dlis 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_DLIS_Intermed iate_7153ft.dlis 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_DLIS_Intermed iate_9383ft.dlis 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Service_RM_DLIS_Production _10636ft.dlis 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 EOW Letter.doc36632EDDigital Data DF 5/18/2022 Electronic File: CPAI_WD-03_CD1_Drilling Mechanics_Depth_Surface.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_Drilling_Mechanics_Depth_Intermediate .PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_Drilling_Mecha nics_Depth_Intermediate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_Drilling_Mechanics_Depth_Production.Pdf 36632ED Digital Data Monday, March 20, 2023AOGCCPage 5 of 9 CPAI_WD- 03EcoScope-_p VISION_Serviec_RM_Composite.las DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RT_2MD_Intermedi ate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RT_2TVD_Intermed iate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RT_5MD_Intermedi ate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RT_5TVD_Intermed iate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RT_2MD_Intermedi ate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RT_5MD_Intermedi ate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_EcoScope_Service_RT_2TVD_Intermediate.P DF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_EcoScope_Service_RT_5TVD_Intermediate.P DF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Service_RT_2MD_Production_ TD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Service_RT_2TVD_Production _TD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Service_RT_5MD_Production_ TD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Service_RT_5TVD_Production _TD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Resistivity_RM_2MD_Surface. Pdf 36632ED Digital Data Monday, March 20, 2023AOGCCPage 6 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Resistivity_RM_2TVD_Surface. Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Resistivity_RM_5MD_Surface. Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_VISION_Resistivity_RM_5TVD_Surface. Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_2MD_Intermedi ate_7153ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_2TVD_Interme diate_7153ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_5MD_Intermedi ate_7153ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_5TVD_Interme diate_7153ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_2MD_Intermedi ate_9383ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_5MD_Intermedi ate_9383ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_EcoScope_Service_RM_2TVD_Intermediate_ 9383ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_EcoScope_Service_RM_5TVD_Intermediate_ 9383ft.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CAPI_WD- 03_VISION_Service_RM_2MD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CAPI_WD- 03_VISION_Service_RM_2TVD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CAPI_WD- 03_VISION_Service_RM_5MD.Pdf 36632ED Digital Data Monday, March 20, 2023AOGCCPage 7 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No DF 5/18/2022 Electronic File: CAPI_WD- 03_VISION_Service_RM_5TVD.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD-03_CD1_Drilling Mechanics_Time_Surface.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_Drilling_Mechanics_Time_Intermediate. PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_CD1_EcoScope_Service_RM_Drilling_Mecha nics_Time_Intermediate.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_Drilling_Mechanics_Time_Production.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD27 EOW Compass Surveys [Canvas].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD27 EOW Compass Surveys [Macro].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD27 EOW Compass Surveys [Petrel].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD27 EOW Compass Surveys [Surveys].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD27 EOW Compass Surveys.pdf 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD83 EOW Compass Surveys [Canvas].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD83 EOW Compass Surveys [Macro].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD83 EOW Compass Surveys [Petrel].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD83 EOW Compass Surveys [Surveys].txt 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03 NAD83 EOW Compass Surveys.pdf 36632ED Digital Data DF 5/18/2022 Electronic File: WD-03_Surveys_TD.xlsx36632EDDigital Data DF 5/18/2022 Electronic File: CPAI_WD- 03_Drilling_Mechanics_Depth_Composite.Pdf 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD-03_EcoScope- VISION_Service_DLIS_Composite.dlis 36632ED Digital Data Monday, March 20, 2023AOGCCPage 8 of 9 DATA SUBMITTAL COMPLIANCE REPORT API No. 50-103-20835-00-00Well Name/No. COLVILLE RIV UNIT WD-03 Completion Status P&ACompletion Date 12/6/2022 Permit to Drill 2211030 Operator ConocoPhillips Alaska, Inc. MD 10636 TVD 9946 Current Status P&A 3/20/2023 UIC No Well Cores/Samples Information: ReceivedStart Stop Comments Total Boxes Sample Set NumberName Interval INFORMATION RECEIVED Completion Report Production Test Information Geologic Markers/Tops Y Y / NA Y Comments: Compliance Reviewed By:Date: Mud Logs, Image Files, Digital Data Composite Logs, Image, Data Files Cuttings Samples Y / NA Y Y / NA Directional / Inclination Data Mechanical Integrity Test Information Daily Operations Summary Y Y / NA Y Core Chips Core Photographs Laboratory Analyses Y / NA Y / NA Y / NA COMPLIANCE HISTORY Date CommentsDescription Completion Date: 12/6/2022 Release Date:1/4/2022 DF 5/18/2022 Electronic File: CPAI_WD-03_EcoScope- VISION_Service_RM_2MD_Composite.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD-03_EcoScope- VISION_Service_RM_2TVD_Composite.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD-03_EcoScope- VISION_Service_RM_5MD_Composite.PDF 36632ED Digital Data DF 5/18/2022 Electronic File: CPAI_WD-03_EcoScope- VISION_Service_RM_5TVD_Composite.PDF 36632ED Digital Data Monday, March 20, 2023AOGCCPage 9 of 9 M. Guhl 3/20/2023 1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: ___________________ Service Stratigraphic Test 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval:17. Field / Pool(s): GL: 19.5 BF: Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y- Zone- 4 TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y- Zone- 4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A (ft MSL) 22. Logs Obtained: N/A 23. BOTTOM 20" A-53 119' 13-3/8" L-80 2339' 7-5/8" L-80 2820' 7-5/8" L-80 8578' 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press: Calculated Gas-MCF: Oil Gravity - API (corr): Press. 24-Hour Rate 1st stage: 223 bbl 13ppg Lead, 45 bbl 15.8 ppg Tail 2nd stage: 71 bbls 15.8 Tail 9. Ref Elevations: KB: 58.5 If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date perf'd or liner run): ACID, FRACTURE, CEMENT SQUEEZE, ETC. CASING, LINER AND CEMENTING RECORD List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, 11" TUBING RECORD 11" 9161'3-1/2" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips Alaska, Inc. WAG Gas 12/6/2022 221-103-0/ 322-582 50-103-20835-00-00 WD-03 ADL0025559 573' FNL, 3050' FEL, Sec. 5, T11N, R5E, UM 2733' FNL, 67' FWL, Sec. 5, T11N, R5E, UM 97-007 1/25/2022 10636' MD/ 9946' TVD Surface/ Surface P.O. Box 100360, Anchorage, AK 99510-0360 385653 5975557 2733' FNL, 67' FWL, Sec. 5, T11N, R5E, UM CASING WT. PER FT.GRADE 3/4/2022 CEMENTING RECORD 5973432 1583' MD/ 1559' TVD SETTING DEPTH TVD 5973432 TOP HOLE SIZE AMOUNT PULLED 383465 383465 TOP SETTING DEPTH MD suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. N/A Colville River Field/ Undefined WDSP, Halo Undefined Gas BOTTOM SIZE DEPTH SET (MD) None PACKER SET (MD/TVD) 42" 16" 10 yds to surface 39'545 bbls 11 ppg Lead, 68 bbls 15.8 ppg Tail 29.7 39' 2434'39' 39' 29.7 9268' 91.5 68 119' 2969' Plugged and Abandoned All Perforations Plugged and Abandoned Gas-Oil Ratio:Choke Size: Per 20 AAC 25.283 (i)(2) attach electronic information Sr Res EngSr Pet GeoSr Pet Eng N/A Oil-Bbl: Water-Bbl: Water-Bbl: PRODUCTION TEST N/A Date of Test: Oil-Bbl: Flow Tubing Form 10-407 Revised 10/2022 Due within 30 days of Completion, Suspension, or Abandonment 3089' 2928' 2550' 2442' By James Brooks at 9:34 am, Jan 05, 2023 Abandoned 12/6/2022 JSB RBDMS JSB 011123 xG SFD 3/20/23 221-103 VTL 03/20/2023 SFD 3/20/2023 DSR-1/20/23 Conventional Core(s): Yes No Sidewall Cores: N/A 30. MD TVD surface Surface 1583' 1559' Top of Productive Interval N/A N/A N/A Ivishak 10636 9947 31. List of Attachments: Schematic, Summary of Operations, P&A photos 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name:Greg Hobbs Digital Signature with Date:Contact Email:greg.s.hobbs@conocophillips.com Contact Phone:(907) 263-4749 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: If Yes, list formations and intervals cored (MD/TVD, From/To), and briefly summarize lithology and presence of oil, gas or water (submit separate pages if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. Yes No Well tested? Yes No 28. CORE DATA If Yes, list intervals and formations tested, briefly summarizing test results for each. Attach separate pages if needed and submit detailed test info including reports and Excel or ASCII tables per 20 AAC 25.071. NAME Permafrost - Top Permafrost - Base 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered) FORMATION TESTS TPI (Top of Producing Interval). Authorized Name and Formation Name at TD: Staff Regulatory Engineer Plugged and Abandoned Authorized Title: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, as-built, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. INSTRUCTIONS Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment; or 90 days after log acquisition, whichever occurs first. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Digitally signed by Greg Hobbs DN: O=Wells, CN=Greg Hobbs, E=greg.s.hobbs@conocophillips.com Reason: I am the author of this document Location: Date: 2023.01.04 11:38:19-09'00' Foxit PDF Editor Version: 12.0.1 Greg Hobbs DTTMSTART JOBTYP SUMMARYOPS 11/28/2022 SUPPORT OTHER OPERATIONS WD-03 P&A - SET UP JOB SHACK, MET WITH R&P AND WELD FOREMAN . JOB DELAYED DUE TO WEATHER AND WELLWORK ON ADJACENT WELL CD1-49. 11/29/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (IN PROGRESS) BEGAN EXCAVATION FOR CELLAR BOX REMOVAL. CONTINUE EXCAVATING TO 8'.(TARGET DEPTH OF 16' ). 11/30/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (IN PROGRESS) WEATHER DELAYED-BEGAN EXCAVATION FOR SHORE BOX INSTALLATION.EXCAVATED TO 12' , 6' BELOW ORIGINAL TUNDRA REFERENCE. 12/1/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (IN PROGRESS) -WD-03 EXCAVATEDTO 12' FOR SHORE BOX, REMOVED FROZEN COMPACTED SOIL MATERIAL FROM INSULATED JACKET. READY FOR EGRESS EXCAVATION. 12/2/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (IN PROGRESS) EXCAVATE EGRESS 12/3/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (IN PROGRESS) SET SHORE BOX AND EGRESS STAIRS. WELDERS REMOVED INSULATED JACKET, INSULATORS STRIPPED THE INSULATION OFF OF CONDUCTOR. GAVE 48 NOTICE TO AOGCC FOR WITNESSING TOC AND MARKER PLATE. 12/4/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (IN PROGRESS) CUT AND REMOVED ~>14' 1" OF WELLHEAD, MEASURED FROM THE 10' REFERENCE MARK. (4' BELOW ORIGINAL TUNDRA). VERIFIED MARKER PLATE INFORMATION. 12/5/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (COMPLETED) AOGCC INSPECTOR GUY COOK VERIFIED MARKER PLATE INFORMATION AND 14' OF WELLHEAD REMOVAL. ASRC WELDED MARKER PLATE IN PLACE. R&P PULLED SHORING AND STAIRS BEGAN BACKFILL OPERATIONS. 12/6/2022 SUPPORT OTHER OPERATIONS WD-03 P&A (COMPLETE) OBTAINED FINAL SITE CLEARANCE FROM AOGCC INSPECTOR GUY COOK. DEMOBED EQUIPMENT FROM WD-03 TO CD4-213 WD-03 Plug and Abandon Summary of Operations 2022-1207_Location_CRU_WD-03_gc Page 1 of 2 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: 12/07/2022 P. I. Supervisor FROM: Guy Cook SUBJECT: Plug and Abandon Petroleum Inspector Alpine WD-03 Conoco/Phillips Alaska Inc. PTD 2211030; Sundry 322-582 12/07/2022: I arrived on site and met with Roger Mauser with ConocoPhillips. Alpine’s WD-03 had been buried and he had asked for a site clearance. The area where the well was buried was clean of debris with a mound of gravel/dirt left for the ground/pad to settle with. Attachments: Photos (2) 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2023.04.19 13:02:21 -08'00' 2022-1207_Location_CRU_WD-03_gc Page 2 of 2 Location – CRU WD-03 (PTD 2211030) Photos by AOGCC Inspector G. Cook 12/7/2022 2022-1205_Surface_Abandon_CRU_WD-03_gc Page 1 of 3 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: 12/05/2022 P. I. Supervisor FROM: Guy Cook SUBJECT: Surface Abandonment Petroleum Inspector Colville River Unit WD-03 ConocoPhillips Alaska Inc. PTD 2211030; Sundry 322-582 12/04/2022: I arrived on site and met with Roger Mauser with ConocoPhillips. I confirmed cut-off depth was 4 feet below tundra level. I also confirmed that cement was to surface and cured. 12/05/2022: I returned to the drill-site to witness the installation of the identification plate and to ensure the information on the identification plate was correct. All went well and the plate was welded onto the casing with the correct information. I informed Mr. Mauser he could proceed with burying the well. Attachments: Photos (4) 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2023.04.19 12:52:11 -08'00' 2022-1205_Surface_Abandon_CRU_WD-03_gc Page 2 of 3 Surface Abandonment – CRU WD-03 (PTD 2211030) Photos by AOGCC Inspector G. Cook 12/5/2022 2022-1205_Surface_Abandon_CRU_WD-03_gc Page 3 of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y Anne Prysunka at 3:48 pm, Oct 03, 2022 Travis Smith Digitally signed by Travis Smith Date: 2022.10.03 10:15:13 -08'00' 6)'   '65 ; $2*&& LQVSHFWLRQ UHTXLUHG DIWHU FXWRII DQG EHIRUH UHPHGLDO FHPHQWLQJ  97/  3KRWR GRFXPHQW ; *&:  Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2022.10.04 15:27:50 -08'00' RBDMS JSB 100622 tͲϬϯWΘ^ƚĞƉƐ;WŚŽƚŽŽĐƵŵĞŶƚĨŽƌK'Ϳ  tͲϬϯWΘ^ƚĞƉƐ;WŚŽƚŽŽĐƵŵĞŶƚĨŽƌK'Ϳ EĞƚǁŽƌŬηϭϬϰϰϯϮϱϰtͲϬϯͲϭWΘ WƌĞƌĞƋƵŝƐŝƚĞƐ͗ xtĞůůDh^dďĞƐĞĐƵƌĞĚ xK'WΘ^ƵŶĚƌLJƉƉƌŽǀĂůŝƐƌĞĐĞŝǀĞĚ xƌĞĂŝǀŝůtŽƌŬZĞƋƵĞƐƚ;tZͿŝƐĂƉƉƌŽǀĞĚ xDĂƌŬĞƌƉůĂƚĞŚĂƐďĞĞŶƌĞƋƵĞƐƚĞĚǁŝƚŚƚŚĞĨŽůůŽǁŝŶŐŝŶĨŽƌŵĂƚŝŽŶ͗ oŽŶŽĐŽWŚŝůůŝƉƐůĂƐŬĂ͕/ŶĐ͘ otͲϬϯ oWdηϮϮϭͲϭϬϯ oW/ηϱϬͲϭϬϯͲϮϬϴϯϱͲϬϬͲϬϬ ZĞƋƵŝƌĞĚƋƵŝƉŵĞŶƚ͗ xĂŵĞƌĂ xEϮƚƌĂŝůĞƌ xWĂŝŶƚŽƌƐƚĂŬĞƐĨŽƌŐƌŽƵŶĚŵĂƌŬŝŶŐ x,ĂŶĚƚŽŽůƐ x,ĞĂƚĞƌƐĂŶĚ>ŝŐŚƚWůĂŶƚƐ xŝƌŽŵƉƌĞƐƐŽƌ xdžĐĂǀĂƚŽƌ x>ŽĂĚĞƌ x^ŚŽƌŝŶŐďŽdž xƌĂŶĞ x>ŝĨƚŝŶŐƐƚƌĂƉƐ x:ĂĐŬ,ĂŵŵĞƌͬĐŚŝƉƉĞƌ xKdžLJĂĐĞƚLJůĞŶĞƚŽƌĐŚ xtĞůĚĞƌ x'ƌŝŶĚĞƌ ^ƚĞƉƐ͗ ϭ͘ŽŶĨŝƌŵƚƵďŝŶŐĂŶĚĂŶŶƵůŝĂƌĞďůĞĚƚŽϬƉƐŝĂŶĚƌĞŵĂŝŶĂƚϬƉƐŝ  Ϯ͘ŽŶĨŝƌŵdŽƉŽĨĞŵĞŶƚ;dKͿŝƐĂƚƐƵƌĨĂĐĞŝŶƚƵďŝŶŐĂŶĚĂŶŶƵůŝ͘dŽƉŽĨĨŝĨŶĞĐĞƐƐĂƌLJ ϯ͘ŝƐĐŽŶŶĞĐƚĨůŽǁůŝŶĞƐ͕ƌĞŵŽǀĞǁĞůůŚŽƵƐĞ͕ĂŶĚƌĞŵŽǀĞĨůŽŽƌŬŝƚŝĨŶĞĐĞƐƐĂƌLJ ϰ͘ZĞŵŽǀĞǁĞůůŚĞĂĚƉůĂƚĨŽƌŵ͕ƚƌĞĞ͕ĂŶĚĂŶŶƵůĂƌǀĂůǀĞƐĂŶĚƐƚŽƌĞŽŶƉĂůůĞƚƐ͘ZĞƋƵĞƐƚƚŽŚĂǀĞ ƚŚĞƚƌĞĞĂŶĚǀĂůǀĞƐŶŽƌŵƚĞƐƚĞĚĂŶĚƚƌĂŶƐƉŽƌƚĞĚƚŽƚŚĞďŽŶĞLJĂƌĚŽƌǀĂůǀĞƐŚŽƉ ϱ͘ZĞǀĞƌŝĨLJdKŝŶĂůůǀŽŝĚƐΘ'ĂƐŵŽŶŝƚŽƌƌĞĂĚŝŶŐƐ;ƉƵƌŐĞǁŝƚŚEϮŝĨŶĞĐĞƐƐĂƌLJͿ ϲ͘/ŶƐƚĂůůƚĂƉƉĞĚďůŝŶĚƐǁŝƚŚϭͬϮ͟ƋƵĂƌƚĞƌƚƵƌŶǀĂůǀĞƐ ϳ͘dĂĐŬtĞůĚĨůƵƚĞƐƚŽĐŽŶĚƵĐƚŽƌƚŽƉƌĞǀĞŶƚĐŽŶĚƵĐƚŽƌĨƌŽŵƐůŝƉƉŝŶŐŽĨĨĚƵƌŝŶŐƌĞŵŽǀĂů ƉƌŽĐĞƐƐ 'R QRW WRS RII :DLW XQWLO ZHOOKHDG LV FXW DQG $2*&& LQVSHFWHG'HWHUPLQH LI tͲϬϯWΘ^ƚĞƉƐ;WŚŽƚŽŽĐƵŵĞŶƚĨŽƌK'Ϳ ϴ͘ZŝŐƵƉƌŝŐŐŝŶŐƚŽƚŚĞǁĞůůŚĞĂĚ ϵ͘DĂƌŬŐƌŽƵŶĚĂƌĞĂĨŽƌƐŚŽƌŝŶŐďŽdžŝŶƐƚĂůůĂƚŝŽŶǁŝƚŚƉĂŝŶƚŽƌƐƚĂŬĞƐ ϭϬ͘džĐĂǀĂƚĞƚŽƌĞŵŽǀĞĐĞůůĂƌďŽdž ϭϭ͘ƵƚĂŶĚƌĞŵŽǀĞĐĞůůĂƌďŽdž ϭϮ͘džĐĂǀĂƚĞƚŽĚĞƉƚŚ;ƚĂƌŐĞƚǁĞůůŚĞĂĚĐƵƚĚĞƉƚŚŝƐϰ͛ďĞůŽǁƚƵŶĚƌĂΕϭϱ͛ĞdžĐĂǀĂƚŝŽŶͿĨŽƌƐŚŽƌŝŶŐ ďŽdžĂŶĚƐƚĂŝƌƐŝŶƐƚĂůůĂƚŝŽŶ ϭϯ͘>ĂLJΕϭ͛ŽĨŐƌĂǀĞůŝŶƚŚĞďŽƚƚŽŵŽĨƚŚĞĞdžĐĂǀĂƚŝŽŶ ϭϰ͘^ĞƚƐŚŽƌŝŶŐďŽdžĂŶĚƐƚĂŝƌƐ ϭϱ͘'ŝǀĞϰϴͲŚŽƵƌŶŽƚŝĐĞƚŽK'ĨŽƌŽƉƉŽƌƚƵŶŝƚLJƚŽǀŝĞǁĂŶĚǀĞƌŝĨLJ&ŝŶĂůWΘĂŶĚDĂƌŬĞƌ ƉůĂƚĞŝŶĨŽƌŵĂƚŝŽŶ ϭϲ͘DĞĂƐƵƌĞĨŽƌĨŝŶĂůĐƵƚŽĨtĞůů^ƚƵď ϭϳ͘/ŶƐƉĞĐƚƌŝŐŐŝŶŐŽŶƚŚĞǁĞůůŚĞĂĚĂŶĚƌŝŐƚŚĞĐƌĂŶĞƚŽƚŚĞǁĞůůŚĞĂĚ ϭϴ͘ZĞŵŽǀĞŝŶƐƵůĂƚĞĚũĂĐŬĞƚĂŶĚ/ŶƐƵůĂƚŝŽŶƉůƵƐϭ͘ϱͲϮ͛ŽĨŝŶƐƵůĂƚŝŽŶŝŶƐŝĚĞƚŚĞũĂĐŬĞƚ ϭϵ͘tĞůĚĂƚŚƌĞĂĚŽͲůĞƚŽŶƚŽƚŚĞĐŽŶĚƵĐƚŽƌ͕ŝŶƐƚĂůůĂЬƚƵƌŶǀĂůǀĞ͕ĂŶĚĚƌŝůůŝŶƚŽƚŚĞĂŶŶƵůŝ ĐŚĞĐŬŝŶŐĨŽƌ>>Ɛ͕ĨůƵŝĚƐ͕ƉƌĞƐƐƵƌĞ͕ŽƌŐĂƐ ϮϬ͘ƵƚĂǁŝŶĚŽǁŝŶƚŽƚŚĞĐŽŶĚƵĐƚŽƌƚŽƌĞŵŽǀĞƚŚƌĞĂĚŽͲůĞƚĂŶĚĐůĞĂŶŽƵƚĐĞŵĞŶƚĨŽƌĂĐĐĞƐƐƚŽ ŶĞdžƚĐĂƐŝŶŐ Ϯϭ͘tĞůĚĂƚŚƌĞĂĚŽͲůĞƚŽŶƚŽƚŚĞ^͕ŝŶƐƚĂůůĂЬƚƵƌŶǀĂůǀĞ͕ĂŶĚĚƌŝůůŝŶƚŽƚŚĞĂŶŶƵůŝĐŚĞĐŬŝŶŐĨŽƌ >>Ɛ͕ĨůƵŝĚƐ͕ƉƌĞƐƐƵƌĞ͕ŽƌŐĂƐ ϮϮ͘ƵƚĂǁŝŶĚŽǁŝŶƚŽƚŚĞ^ƚŽƌĞŵŽǀĞƚŚƌĞĂĚŽͲůĞƚĂŶĚĐůĞĂŶŽƵƚƚŚĞƌĞŵĂŝŶŝŶŐĐĞŵĞŶƚ Ϯϯ͘ƵƚŽĨĨƚŚĞǁĞůůŚĞĂĚǁŽƌŬŝŶŐĨƌŽŵŝŶŶĞƌŵŽƐƚƐƚƌŝŶŐŽƵƚ;ƉĂLJĂƚƚĞŶƚŝŽŶƚŽƚŚĞůŽĂĚŽŶƚŚĞ ĐƌĂŶĞĂŶĚďĞĂǁĂƌĞŽĨƉŽƐƐŝďůĞŵŽǀĞŵĞŶƚŽĨǁĞůůŚĞĂĚĂƐŵĂŬŝŶŐĨŝŶĂůĐƵƚŽŶĐŽŶĚƵĐƚŽƌͿ Ϯϰ͘EŽƌŵƚĞƐƚtĞůůŚĞĂĚĂŶĚƉŝƉŝŶŐ Ϯϱ͘DĞĂƐƵƌĞƚŚĞK>ŽĨƚŚĞǁĞůůŚĞĂĚĂŶĚƉŝƉŝŶŐƌĞŵŽǀĞĚĂŶĚƉŚŽƚŽĚŽĐƵŵĞŶƚƚĂƉĞ ŵĞĂƐƵƌĞŵĞŶƚ Ϯϲ͘WƌĞƉƌĞŵĂŝŶŝŶŐǁĞůůƐƚƵďŝŶƚŚĞŐƌŽƵŶĚĨŽƌŝŶƐƚĂůůĂƚŝŽŶŽĨWΘЬ͟DĂƌŬĞƌƉůĂƚĞ Ϯϳ͘ƐŬƚŚĞK'/ŶƐƉĞĐƚŽƌĨŽƌƉĞƌŵŝƐƐŝŽŶƚŽƚŽƉŽĨĨĐĞŵĞŶƚŝŶŝŶƐƵůĂƚĞĚũĂĐŬĞƚĂŶĚŝŶŽƚŚĞƌ ƐƚƌŝŶŐƐŝĨŶĞĞĚĞĚ Ϯϴ͘sĞƌŝĨLJϭͬϰ͟DĂƌŬĞƌWůĂƚĞŚĂƐƚŚĞĐŽƌƌĞĐƚŝŶĨŽƌŵĂƚŝŽŶ;ƉŚŽƚŽĚŽĐƵŵĞŶƚͿ͕ĂŶĚŝŶƐƵƌĞŝƚĐŽǀĞƌƐ ƚŚĞĞŶƚŝƌĞǁĞůůƐƚƵď͕ŝŶĐůƵĚŝŶŐƚŚĞŝŶƐƵůĂƚĞĚũĂĐŬĞƚ Ϯϵ͘tĞůĚDĂƌŬĞƌƉůĂƚĞ;ƉŚŽƚŽŽĐƵŵĞŶƚͿǁŝƚŚĨŽůůŽǁŝŶŐŝŶĨŽƌŵĂƚŝŽŶ͗ ŽŶŽĐŽWŚŝůůŝƉƐůĂƐŬĂ͕/ŶĐ͘ tͲϬϯ WdηϮϮϭͲϭϬϯ W/ηϱϬͲϭϬϯͲϮϬϴϯϱͲϬϬͲϬϬ  ϯϬ͘WƵůůƐŚŽƌŝŶŐĂŶĚďĂĐŬĨŝůů ϯϭ͘WŽƐƚďĂĐŬĨŝůůWŚŽƚŽĚŽĐƵŵĞŶƚĂƚŝŽŶĂŶĚƌĞƋƵĞƐƚĨŝŶĂůƐŝƚĞĐůĞĂƌĂŶĐĞĨƌŽŵK' $2*&& LQVSHFWLRQ UHTXLUHG DIWHU FXWRII DQG EHIRUH UHPHGLDO FHPHQWLQJ tͲϬϯWΘ^ƚĞƉƐ;WŚŽƚŽŽĐƵŵĞŶƚĨŽƌK'Ϳ tͲϬϯWΘ^ƚĞƉƐ;WŚŽƚŽŽĐƵŵĞŶƚĨŽƌK'Ϳ  1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory GINJ WINJ WDSPL No. of Completions: _____________ Service Stratigraphic Test 2. Operator Name:6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: Aband.: 3. Address: 7. Date Spudded: 15. API Number: 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: Top of Productive Interval: 9. Ref Elevations: KB: 17. Field / Pool(s): GL: 19.5 BF: Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- y-Zone-4 TPI: x- y-Zone-4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- y-Zone-4 5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore (ft MSL):21. Re-drill/Lateral Top Window MD/TVD: Submit electronic information per 20 AAC 25.050 N/A 22. Logs Obtained: LWD: Gamma Ray, Resistivity, Density Neutron, Accoustic E-Line: Accoustic Cement Bond, Accoustic Flow Detection 23. BOTTOM Conductor A-53 119 Surface L-80 2338 Intermediate L-80 8578 24. Open to production or injection? Yes No 25. 26. Was hydraulic fracturing used during completion? Yes No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. Date First Production: Method of Operation (Flowing, gas lift, etc.): Hours Tested: Production for Gas-MCF: Test Period Casing Press:Calculated Gas-MCF:Oil Gravity - API (corr): Press. 24-Hour Rate STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ConocoPhillips WAG Gas N/A 42 BOTTOM 1/25/2022 10,636/9,946 Surface 58.5 HOLE SIZE AMOUNT PULLED P.O. Box 100360 Anchorage, AK 99510-0360 5/2/2022 221-103/322-233, 322-195, 322-186 322-179, 322-157, 322-140 50-103-20835-00-00 WD-03 ADL025559 573' FNL, 3050' FEL, Sec. 5, T11N, R5E, U.M. 39 2733' FNL, 67' FWL, Sec. 5, T11N, R5E, U.M. CASING, LINER AND CEMENTING RECORD 385653 5975558 CASING WT. PER FT.GRADE List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion, 1639 545bbls 11ppg Lead + 68bbls 15.8ppg tail 3/4/2022 383465 383465 TOP SETTING DEPTH MD 39 CEMENTING RECORD 5973432 1,583 / 1,558 SETTING DEPTH TVD 5973432 TOP 10 yards to surface 97-007 2733' FNL, 67' FWL, Sec. 5, T11N, R5E, U.M. Per 20 AAC 25.283 (i)(2) attach electronic information 29.7 39 91.5 68 119 39 9268 SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 39 2435 TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): ACID, FRACTURE, CEMENT SQUEEZE, ETC. 1st Stage: 223bbls 13ppg lead + 45bbls 15.8ppg tail 2nd Stage: 71bbls 15.8ppg tail 11 Flow Tubing Gas-Oil Ratio:Choke Size:Water-Bbl: PRODUCTION TEST Date of Test: Sr Res EngSr Pet GeoSr Pet Eng Colville River Field / Undefined Waste Disposal Pool N/A Oil-Bbl:Water-Bbl: Oil-Bbl: suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary Other 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Exploratory Abandoned Suspended Stratigraphic Test No SPLUG No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment By Meredith Guhl at 9:18 am, Jun 02, 2022 Suspended 5/2/2022 MDG G RBDMS 6/2/2022 MDG DSR-7/14/22SFD 8/12/2022VTL 03/20/2023 Conventional Core(s): Yes No Sidewall Cores: 3 MD TVD Permafrost - Top Surface Surface Permafrost - Base 1583 1559 C40 2268 2188 C30 2526 2421 C20 2916 2773 C10 3194 3023 K3 4073 3809 Qannik 4337 4042 Albian 97 6349 5798 Albian 96 6871 6257 HRZ 7304 6647 Kalubik 7451 6784 Kuparuk C 7539 6867 LCU/Miluveach 7590 6916 Alpine C 7738 7060 Sag River 9437 8748 9889 9200 10636 9947 31. List of Attachments: Summary Timelog, Final Wellbore Schematic, Cement Plug Test Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Matt Smith Contact Email:matt.smith2@conocophillips.com Authorized Contact Phone:907-263-4324 General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: TPI (Top of Producing Interval). INSTRUCTIONS The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Well TD (Formation: Ivishak) Signature w/Date: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Authorized Name: Greg Hobbs Authorized Title: Staff Regulatory Engineer TPI: (Formation: Ivishak) Yes No Well tested? Yes No 28. CORE DATA If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. NAME 29. GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. No NoSidewall Cores: Yes No Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment Digitally signed by Greg HobbsDN: O=Wells, CN=Greg Hobbs, E=greg.s.hobbs@conocophillips.comReason: I am the author of this documentLocation: your signing location here Date: 2022.06.01 18:10:34-08'00'Foxit PDF Editor Version: 11.2.1 Greg Hobbs WD-03 Final P&A Schematic 6-¾” Production Hole 10636' MD / 9946' TVD 20" 91.5# A-53 Welded Conductor to 120' 16" Surface Hole 13-3/8" 68# L-80 Hyd563 Surface Casing @ 22* 2434' MD / 2338' TVD 7 5/8" 29.7# L-80 TXP Intermediate Casing 9268' MD / 8578' TVD 9-7/8" Intermediate Rathole 9,383' MD / 8,693' TVD Alpine C – Oil Zone 7738' MD / 7059' TVD Kingak – Barrier 7848' MD / 7167' TVD Sag – Injection Zone 9437' MD / 8747' TVD Shublik – Barrier 9475' MD / 8786' TVD Ivishak – Injection Zone 9889' MD / 9199' TVD Kuparuk C – Oil Zone 7585' MD / 6912' TVD Top of Cement +/- 6252' MD / 5713' TVD (500' MD above Nanuk) Cementing stage tool 7-5/8" 29.7# Hyd563 4500' MD / 4184' TVD Qannik – Oil/Gas Zone 4337' MD / 4042' TVD Top of Stage 2 Cement 3490' MD / 3289' TVD (min req. 500' MD above K3 Basal) K3 Basal – Oil/Gas Zone 4299' MD / 4008' TVD HRZ 7304' MD / 6647' TVD TVD Reference Mean Sea Level 58.50 ft Nanuq 6798' MD / 6192' TVD C30 2562' MD / 2421' TVD C20 2916' MD / 2773' TVD C10 / Halo 3193' MD / 3023' TVD RetainerRetainer Cement Retainer 9200' MD / 8511' TVD Perforations 3450' MD / 3253' TVD Top of P&A Plug +/- 4179' MD / 3902' TVD (min req. 100' MD above K3 Basal) Bridge PlugBridge Plug Bridge Plug 3590' MD / 3379' TVD TOC +/- 9161' MD / 8471' TVD RetainerRetainer Cement Retainer 3,430' MD / 3235' TVDTOC 3,200' MD / 3,028' TVD Section Mill & Cement 2,969'MD / 2,820' TVD- 3,089' MD / 2,929' TVD Perforations 3150' MD / 2,983' TVD – 3,170'MD / 3,001' TVD Bridge PlugBridge Plug Bridge Plug 3190' MD / 3019' TVD Cut Casing 2,550' MD / 2,442' TVD TOC 2,575' MD Bridge Plug 2,856' MD TOC 2,155' MD / 2,086' TVD Bridge Plug ~256' MD/TVD TOC 2,869' MD / 2,729' TVD Bridge PlugBridge Plug Bridge PlugBridge Plug TOC Surface Page 1/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/21/2022 00:00 1/21/2022 01:00 1.0 0 0.0 0.0 MIRU, MOVE MOB P Set and shim mats for sub base 1/21/2022 01:00 1/21/2022 04:30 3.5 0 0.0 0.0 MIRU, MOVE MOB P Set down rear stompers and skid rig floor 1/21/2022 04:30 1/21/2022 05:30 1.0 0 0.0 0.0 MIRU, MOVE MOB P Spot and set down pits 1/21/2022 05:30 1/21/2022 07:00 1.5 0 0.0 0.0 MIRU, MOVE MOB P Spot and set pump mod 1/21/2022 07:00 1/21/2022 08:30 1.5 0 0.0 0.0 MIRU, MOVE MOB P Set gen mod 1/21/2022 08:30 1/21/2022 09:00 0.5 0 0.0 0.0 MIRU, MOVE MOB P Set rock washer 1/21/2022 09:00 1/21/2022 14:30 5.5 0 0.0 0.0 MIRU, MOVE MOB P Attempt to move pipe shed onto pad. Had to stop in order to disconnect & move connex near injection plant. Continue with moving rig onto pad. near position. 1/21/2022 14:30 1/21/2022 17:30 3.0 0 0.0 0.0 MIRU, MOVE MOB T While attempting to move the pipe shed, NES sow broke down. Had to get mechanic to C/O hydruilic pump. 1/21/2022 17:30 1/21/2022 18:30 1.0 0 0.0 0.0 MIRU, MOVE MOB P Spot pipe shed in place 1/21/2022 18:30 1/22/2022 00:00 5.5 0 0.0 0.0 MIRU, MOVE MOB P Start hooking inner connects, steam, hard line betwqeen all modules. Put heaters near cellar to warm up. R/U Beaverslide to Sub. 1/22/2022 00:00 1/22/2022 06:00 6.0 0 0.0 0.0 MIRU, MOVE MOB P Continue riiging up. Berm cellar, connect sub/choke kill lines. P/U pipe skate and string up cables. 1/22/2022 06:00 1/22/2022 12:00 6.0 0 0.0 0.0 MIRU, MOVE MOB P Load 35 joints of 5" DP into pipe shed. to warm up for strapping. Install certified decent deivce in derrick. Put starting head in pipe shed to warm up, C/O beaverslide warning light fixture. Perform post move derrick inspection. Load landing joint into pipe shed. 1/22/2022 12:00 1/22/2022 16:00 4.0 0 0.0 0.0 MIRU, MOVE MOB P Continue to work on derrick inpsection, Install MPD control console in MPD deck, C/O hydrualic fluid. Start to load 13-3/8" casing in the pipe shed - bottom row. 1/22/2022 16:00 1/22/2022 18:00 2.0 0 0.0 0.0 MIRU, MOVE NUND P Load starting head into celllar. Install as per FMC rep. Installed flanged surfice riser nipple. Take RKB = 36.85 1/22/2022 18:00 1/23/2022 00:00 6.0 0 0.0 0.0 MIRU, MOVE NUND P Continue Riggign up surface riser, center over well and secure. Move MPD hyd equipment into place. Continue processing first row 13 3/8" casing. 1/23/2022 00:00 1/23/2022 06:00 6.0 0 0.0 0.0 MIRU, MOVE NUND P Continue loading and strapping 13 3/8" casing. N/U riser from cellar to rig floor. Reposition Rock washer cuttings box to fitArtic cutting boxes, lay down herculite, spot equipment and berm. Test and check Totco pit alarm speakers. Work on HSE audit checklist. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 2/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/23/2022 06:00 1/23/2022 12:00 6.0 0 0.0 0.0 MIRU, MOVE NUND P Continue installing containment area around cuttings tanks. Start loading, strap/tally 5" DP. Locate and stage BHA lift caps and X-overs for BHA #1. Plumb in and wire MPD controls. Dry run bit breaker and bit box Replace pill pit agitator switch. test - good. Rig went on hi-line 10:00 hrs - but then back on Gens @ 18:00 hrs. 1/23/2022 12:00 1/23/2022 15:00 3.0 0 0.0 0.0 MIRU, MOVE NUND P Install 4" Valves and plumbing on conductor. Prep shed and rig floor to start P/U 5" DP and racking back. 1/23/2022 15:00 1/23/2022 21:00 6.0 0 0.0 0.0 MIRU, MOVE PULD P P/U 93 jts 5" DP - Stand back 1/23/2022 21:00 1/24/2022 00:00 3.0 0 0.0 0.0 MIRU, MOVE PULD P Load and strap 17 joints of HWDP & jars. Move to short side. Load remaining 207 jts of 5" DP- strap and tally 1/24/2022 00:00 1/24/2022 06:00 6.0 0 0.0 0.0 MIRU, MOVE PULD P Conitnue loading 5" DP, drift, strap and tally. 1/24/2022 06:00 1/24/2022 12:00 6.0 0 0.0 0.0 MIRU, MOVE PULD P Continue build stands 5" drill pipe. 1/24/2022 12:00 1/24/2022 15:45 3.7 5 0.0 0.0 MIRU, MOVE PULD P Continue build stands 5" drill pipe. Total 100stds racked back. Concurrently spot MPD RCD housing, orbit valve, and RCD bearings in BOP deck. 1/24/2022 15:45 1/24/2022 17:15 1.5 0 0.0 0.0 MIRU, MOVE PULD P Build and rackback 5 stands of 5" HWDP w/ jar. 1/24/2022 17:15 1/24/2022 18:45 1.5 0 0.0 0.0 MIRU, MOVE RURD P Pull mousehole from rotary table. Prep shed and floor for PU mud motor. 1/24/2022 18:45 1/24/2022 22:00 3.2 5 0.0 0.0 MIRU, MOVE PULD P Pick up surface motor and make up Flex collar, XO and 1 joint HWDP. Dial up mud motor from 1.5° to 1.83°. Rack back BHA. 1/24/2022 22:00 1/25/2022 00:00 2.0 0 0.0 0.0 MIRU, MOVE OTHR P Clean and clear rig floor. Bring in second row of 13 3/8" csg in pipe shed. Clean, drift and tally same. 1/25/2022 00:00 1/25/2022 06:00 6.0 0 0.0 0.0 MIRU, MOVE OTHR P Continue offload 13 3/8" csg in pipe shed. Clean, drift and tally same. Concurrently spot Magtech vac unit in position with crane. Begin wire up electrical components in preperation for function testing. 1/25/2022 06:00 1/25/2022 11:30 5.5 0 0.0 0.0 MIRU, MOVE RURD P Continue plumbing in Magtec ACB box's. Build 600V mobile plug board for ACB unit and fab stairs for ACB boxes. Test fit TopDrive wireline entry port on S pipe. Take on 250bbl of 10.0ppg Drilplex mud in pits. 1/25/2022 11:30 1/25/2022 12:00 0.5 0 0.0 0.0 MIRU, MOVE SFTY P Hold prespud meeting with crews. 1/25/2022 12:00 1/25/2022 16:00 4.0 0 0.0 0.0 MIRU, MOVE RURD P Continue plumbing in Magtec ACB box's. Build 600V mobile plug board for ACB unit and fab stairs for ACB boxes. Continue take on 10.0ppg Drilplex mud to pits. Continue work on comms. Plumb in H2O to mud engineer shack. 1/25/2022 16:00 1/25/2022 17:30 1.5 0 0.0 92.0 MIRU, MOVE BHAH P Hold PJSM. MU 16" Kymera bit (SN: 5308691) to 9.62" Dyna-Drill mud motor (5/6 4.0 stg .108rpg). MU flex collar, XO and HWDP. RIH f/ surface t/ 92'. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 3/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/25/2022 17:30 1/25/2022 18:00 0.5 0 92.0 92.0 MIRU, MOVE PRTS P Fill hole and press test mud lines to 3500psi. Good test. 1/25/2022 18:00 1/25/2022 18:30 0.5 0 92.0 119.0 MIRU, MOVE WASH P Wash down w/ surface BHA f/ 92' t/ 120' w/ 450gpm, 620psi SPP, 40rpm, 1-2k TQ. Tag bottom at 119'. 1/25/2022 18:30 1/25/2022 19:00 0.5 0 119.0 170.0 SURFAC, DRILL DRLG P Drill 16" surface hole f/ 119' t/ 170'. WOB: 1K Flow: 450gpm SPP: 624 Diff: 55psi Rotary: 40rpm TQ: 1K Flow: 54% PUW: 53k SOW: 60k RT WT: 57k 1/25/2022 19:00 1/25/2022 20:00 1.0 0 170.0 0.0 SURFAC, DRILL TRIP P Circulate hole clean (139bbl's). TOH f/ 170' t/ surface racking back HWDP. Inspect Bit. 1/25/2022 20:00 1/25/2022 22:30 2.5 0 0.0 119.0 SURFAC, DRILL BHAH P Continue PU surface BHA components consisting of: 12 1/8" NM stab, GWD, 8 1/4" Arc LWD, 8 1/4" TeleScope MWD, 12 1/8" NM stab, 8 1/4" Flex NMDC, XO, HWDP. Scribe GWD and MWD GWD TFO 21.78° MWD TFO 255.69° 1/25/2022 22:30 1/25/2022 23:00 0.5 0 119.0 150.0 SURFAC, DRILL WASH P Wash down f/ 119' t/ 150' w/ 450gpm, 620psi SPP, 40rpm, 1k TQ. 1/25/2022 23:00 1/26/2022 00:00 1.0 0 150.0 110.0 SURFAC, DRILL OTHR T Schlumberger trouble shoot electrical system. Recieving electrical interference. Change transducer on mud manifold, change junction box and network switch. 1/26/2022 00:00 1/26/2022 01:15 1.2 5 110.0 110.0 SURFAC, DRILL OTHR T Schlumberger continue trouble shoot electrical system. Recieving electrical interference. Finish change network switch. 1/26/2022 01:15 1/26/2022 01:30 0.2 5 110.0 170.0 SURFAC, DRILL WASH T Wash down f/ 119' t/ 157' w/ 450gpm, 620psi SPP, 40rpm, 1k TQ. 1/26/2022 01:30 1/26/2022 02:00 0.5 0 170.0 230.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 119' t/ 170'. WOB: 1K Flow: 450gpm SPP: 624 Diff: 55psi Rotary: 50rpm TQ: 1K Flow: 54% PUW: 53k SOW: 60k RT WT: 57k Slide time: 0hrs. 1/26/2022 02:00 1/26/2022 02:30 0.5 0 230.0 150.0 SURFAC, DRILL TRIP P Circulate hole clean. TOH f/ 230' t/150 racking back HWDP. 1/26/2022 02:30 1/26/2022 03:45 1.2 5 150.0 230.0 SURFAC, DRILL BHAH P Continue PU surface BHA components consisting of: 8 1/4" Flex NMDC (w/ totco ring), 12 1/8" NM stab, 8 1/4" Flex NMDC, NMDC, XO, HWDP. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 4/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/26/2022 03:45 1/26/2022 06:00 2.2 5 230.0 356.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 230' t/ 356'. WOB: 8K Flow: 600gpm SPP: 645 Diff: 10psi Rotary: 40rpm TQ: 6K Flow: 63% PUW: 82k SOW: 80k RT WT: 81k Slide Time: .25hr Note: 16" KOP 230' 1/26/2022 06:00 1/26/2022 09:30 3.5 0 356.0 495.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 356' t/ 495'. WOB: 10K Flow: 600gpm SPP: 1015 Diff: 20psi Rotary: 40rpm TQ: 3K Flow: 63% PUW: 84k SOW: 86k RT WT: 83k Slide Time: 1.08hr 1/26/2022 09:30 1/26/2022 10:00 0.5 0 495.0 495.0 SURFAC, DRILL SVRG P Rig service. 1/26/2022 10:00 1/26/2022 11:00 1.0 0 495.0 495.0 SURFAC, DRILL RGRP T Trouble shoot and repair standpipe transducer. 1/26/2022 11:00 1/26/2022 18:00 7.0 0 495.0 922.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 495' t/ 922'. WOB: 5K Flow: 600gpm SPP: 1130 Diff: 30psi Rotary: 40rpm TQ: 3-5K Flow: 62% PUW: 100k SOW: 88k RT WT: 91k Slide Time: 2.84hr 1/26/2022 18:00 1/26/2022 23:15 5.2 5 922.0 1,457.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 922' t/ 1457'. WOB: 17-25K Flow: 600gpm SPP: 1455 Diff: 200psi Rotary: 40rpm TQ: 7-10K Flow: 68% PUW: 115k SOW: 98k RT WT: 94k Slide Time: 0.84hr Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 5/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/26/2022 23:15 1/27/2022 00:00 0.7 5 1,457.0 1,457.0 SURFAC, DRILL DDRL T Observe increase in gas and erratic flow out. Flow check well and observe gas at surface. Circulate BU and monitor gain loss w/ 650gpm, 1440psi SPP. Flow check. Well static. Notify drilling superintendent. Decision made to continue drilling at controlled rate and flow check on connection. Note: Check annulus pressures on adjacent well. No abnormal pressures observed. 1/27/2022 00:00 1/27/2022 06:00 6.0 0 1,457.0 2,150.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 1457' t/ 2018'. WOB: 17-40K Flow: 750gpm SPP: 2015psi Diff: 215psi Rotary: 50rpm TQ: 7-8K Flow: 62% PUW: 108k SOW: 115k RT WT: 108k 1/27/2022 06:00 1/27/2022 12:15 6.2 5 2,150.0 2,437.0 SURFAC, DRILL DDRL P Drill 16" surface hole f/ 2018' t/ 2437'. WOB: 25K Flow: 750gpm SPP: 2155psi Diff: 200psi Rotary: 50rpm TQ: 10K Flow: 63% PUW: 110k SOW: 128k RT WT: 112k 1/27/2022 12:15 1/27/2022 14:30 2.2 5 2,437.0 2,291.0 SURFAC, CASING CIRC P Obtain TD survey. Pump nut plug sweep and circulate 3 BU. Backream OOH f/ 2437' t/ 2291' w/ 750gpm, 1920psi SPP, 40 rpm, 4k TQ. Note: No increase in cuttings w/ sweep at surface. 1/27/2022 14:30 1/27/2022 18:00 3.5 0 2,291.0 1,631.0 SURFAC, CASING REAM P Backream OOH f/ 2291' t/ 1631' (base of permafrost) w/ 750gpm, 1810psi SPP, 40rpm, 4k TQ, ECD 10.65ppge. 1/27/2022 18:00 1/27/2022 18:30 0.5 0 1,631.0 1,538.0 SURFAC, CASING CIRC P Pump nut plug sweep and circulate surface to surface. Backream OOH f/ 1631' t/ 1538' w/ 750gpm, 1920psi SPP, 40 rpm, 4k TQ. 1/27/2022 18:30 1/27/2022 19:30 1.0 0 1,538.0 1,398.0 SURFAC, CASING REAM P Attempt to pull on elevators. Observe 30k overpull. Make up Top Drive and backream OOH f/ 1538' t/ 1398' w/ 750gpm, 1800psi SPP, 40rpm, 5k TQ, ECD 10.72ppge 1/27/2022 19:30 1/27/2022 21:00 1.5 0 1,398.0 1,398.0 SURFAC, CASING OTHR T Observe significant increase in cuttings. Magtec vac unit unable to transfer cuttings. Utilize vac truck to clean out cuttings box until super sucker full. Wait on second super sucker to arrive. Magtec clean out solids from vac unit and thaw out lines. Second super sucker arrive on location and in position at 21:00. Concurrently break circulation every 10 min. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 6/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/27/2022 21:00 1/27/2022 23:00 2.0 0 1,398.0 1,161.0 SURFAC, CASING REAM P Gradually stage up pumps and and attempt to pump OOH. Unable. Continue backream OOH f/ 1398' t/ 1161' w/ 750gpm, 1795psi SPP, 40rpm, 5k TQ, ECD 10.72ppge. 1/27/2022 23:00 1/27/2022 23:30 0.5 0 1,161.0 1,161.0 SURFAC, CASING SVRG P Rig service. Trouble shoot top drive hydraulics. 1/27/2022 23:30 1/28/2022 00:00 0.5 0 1,161.0 1,161.0 SURFAC, CASING RGRP T Unable function Top Drive hydraulics. Confirm reservoir full. Mechanic trouble shoot HPU. Concurrently break circulation every 10 minutes. 1/28/2022 00:00 1/28/2022 20:00 20. 00 1,161.0 1,161.0 SURFAC, CASING RGRP T Mechanic continue trouble shoot Top Drive HPU. Determine pump needs to be changed out. Break off top drive from stump and blow down top drive. Mobilize replacement pump and remove old pump. 1/28/2022 20:00 1/28/2022 20:30 0.5 0 1,161.0 1,161.0 SURFAC, CASING RGRP T Stage pumps up slowly T 400 GPM @ 1215 PSI 54% F/O Orient Motor to hi side for TIH B/D top drive 1/28/2022 20:30 1/28/2022 21:00 0.5 0 1,161.0 1,180.0 SURFAC, CASING RGRP T Attempt to RIH on Elevators from 1161' to 1180' encounter 15k loss in hookload. P/U and Atttempt to work through spot again attempts fail. P/U to 1161' make up top drive wash down @ 250 GPM 466 PSI F/O 45% S/O 100k not able to wash through tight spot, started reaming @ 15 RPM 1/28/2022 21:00 1/29/2022 00:00 3.0 0 1,180.0 1,914.0 SURFAC, CASING WASH T Cont.to Wash and Ream F 1161' to 1914' 300 GPM, 650 PSI F/O 46% S/O 114k RPM 15 TQ 3K 1/29/2022 00:00 1/29/2022 02:00 2.0 0 1,914.0 2,438.0 SURFAC, CASING WASH T Cont.to Wash and Ream F 1914' to 2438' 300 GPM, 650 PSI F/O 46% S/O 114k RPM 15 TQ 3K 1/29/2022 02:00 1/29/2022 04:00 2.0 0 2,438.0 2,209.0 SURFAC, CASING CIRC T Circulate 3X bottoms up racking stand back after eaqch bottoms up. 750 gpm 3850 psi 40 rpm from 2438' tom 2209' strokes pumped 21380. B/D top drive 1/29/2022 04:00 1/29/2022 05:00 1.0 0 2,209.0 2,057.0 SURFAC, CASING TRIP T Tooh from 2209' to 2057' tight spot attempt to work thru serval times 30-35k over pull. Makle up top drive 1/29/2022 05:00 1/29/2022 06:00 1.0 0 2,057.0 1,915.0 SURFAC, CASING REAM T Back ream out hole f/ 2057' to 1915' 740 gpm 40 rpm 1/29/2022 06:00 1/29/2022 12:00 6.0 0 1,915.0 972.0 SURFAC, CASING REAM T BROOH f/ 1915' to 972' 740 gpm 40 rpm TQ 2-4 3200 PSI 88k P/U Seen increase in Torque @ 1660, 1510, 1450. 1410, 1366, worked through w/ no issues. Incountered Tight spots and packoffs @ 1155, to 972' Dropped pump to 550 GPM with 1900 PSI worked through with no issues 1/29/2022 12:00 1/29/2022 17:30 5.5 0 972.0 222.0 SURFAC, CASING REAM P Cont. to BROOH f/ 972' to 222' with n550 GPM, 812 PSI 57 F/O 40 RPM 4-12k Torque, P/U 75K 1/29/2022 17:30 1/29/2022 21:00 3.5 0 222.0 0.0 SURFAC, CASING BHAH P PJSM L/D surface BHA as per SLB F/222' to surface 1/29/2022 21:00 1/29/2022 22:00 1.0 0 0.0 0.0 SURFAC, CASING CLEN P Clear and clean rig floor, Remove all surface BHA. 1/29/2022 22:00 1/30/2022 00:00 2.0 0 0.0 0.0 SURFAC, CASING RURD P P/U 13 3/8" Handling equip. Rig up, SIMOPS change hydraulic filter on top drive, monitor well via Trip Tank 1/30/2022 00:00 1/30/2022 02:00 2.0 0 0.0 0.0 SURFAC, CASING RURD P Change out 350 ton spiders slipes and 6' bail extentions to 8' bail extentions. 1/30/2022 02:00 1/30/2022 03:00 1.0 0 0.0 80.0 SURFAC, CASING PUTB P P/U shoe track as per program to 80' Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 7/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/30/2022 03:00 1/30/2022 03:30 0.5 0 80.0 80.0 SURFAC, CASING SVRG P Service Top Drive, Drawworks and Skate 1/30/2022 03:30 1/30/2022 06:00 2.5 0 80.0 537.0 SURFAC, CASING PUTB P P/U and Run 13 3/8" casing from 80' to 121' check floats held. Continue to RIH with 13 3/8" casing from 121' to 537'. (13 joints and 7' in on joint 14 in the hole) 1/30/2022 06:00 1/30/2022 10:00 4.0 0 537.0 537.0 SURFAC, CASING PUTB T Not able to make forward progress at 537'. Attempt to wash and ream with 25 rpm/7 k trq and 2.5 bpm/40 psi with no success. Initial assumption is we were hanging up inside surface riser. Make alignment adjustment on riser with no success. Remove centralizers on joint 13 and 14 and attempt to run casing with no success. Consult plan forward options with town. Increase flow rate to 4 bpm with no success. Decision made to POOH with casing for clean out run. 1/30/2022 10:00 1/30/2022 18:30 8.5 0 537.0 0.0 SURFAC, CASING PULD T POOH and L/D 13-3/8" casing f/537' to shoe track. Heat with welder and break out bakerlok'd shoe track and remove from pipe shed. 1/30/2022 18:30 1/30/2022 20:30 2.0 0 0.0 0.0 SURFAC, CASING RURD T R/D Doyon casing handling equip and Volant tools. clear and clean rig floor 1/30/2022 20:30 1/31/2022 00:00 3.5 0 0.0 92.0 SURFAC, CASING BHAH T Hold PJSM , P/U and M/U clean out out BHA.F/ 92" MD as per SLB reps. Adjust Mud Motor back to 1.5 Deg from 1.83 Deg 1/31/2022 00:00 1/31/2022 00:30 0.5 0 92.0 92.0 SURFAC, CASING SVRG T Rig Service, tighten up hydraulic pump fittings on seal block. 1/31/2022 00:30 1/31/2022 03:30 3.0 0 92.0 776.0 SURFAC, CASING BHAH T Cont. Make up BHA F/ 92' and RIH to 776' @ 457' tag up w/ 10k Pump up survey, Orientate MWD and Gyro tool to 280 degs worked thru tight spot no issues, cont. TIH to 537" work thru with no issues 3 times, Cont. TIH tag up at 679' highside motor continue TIH no issues to 776' blow down Top Drive. 1/31/2022 03:30 1/31/2022 06:00 2.5 0 776.0 1,800.0 SURFAC, CASING TRIP T Cont.TIH 776' to 1439' Tagged up w/ 10k highside motor no able to work thru. wash down f/ 1439' to 1800' 1/31/2022 06:00 1/31/2022 07:30 1.5 0 1,800.0 2,438.0 SURFAC, CASING TRIP T TIH from 1620' to 2377'. Wash and ream down from 2377' to 2438' TD. SO = 108K ROT = 117K 250 GPM / 355 psi 15 RPM with 3-4K TQ 1/31/2022 07:30 1/31/2022 10:00 2.5 0 2,438.0 2,283.0 SURFAC, CASING CIRC T Circulate B/U while recirpicating pipe, racking back 1 stand per B/U. Pumped 40 bbl Nut plug/Drillzone sweep on bottom. 1/31/2022 10:00 1/31/2022 10:30 0.5 0 2,283.0 2,000.0 SURFAC, CASING OWFF T 15 min flow check good. Blow down TD and begin pulling stands slowly on elevators. P/U weight 114K 1/31/2022 10:30 1/31/2022 12:00 1.5 0 2,000.0 1,341.0 SURFAC, CASING TRIP T Encounter slight swab effect - pump OOH from from 2000' to 1341'. Pumping 3 BPM, 200 psi. P/U weight = 100K 1/31/2022 12:00 1/31/2022 15:45 3.7 5 1,341.0 231.0 SURFAC, CASING TRIP T Continue to pump OOH from 1341' to 231'. 2 BPM/170 psi/ 30% F/O 1/31/2022 15:45 1/31/2022 19:45 4.0 0 231.0 0.0 SURFAC, CASING PULD T Lay down BHA as per SLB rep. Stabalizers and bit were both packed with formation. SIm OPS - P/U davis lynch shoe/float and HT 100 Rig tongs to rig floor. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 8/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 1/31/2022 19:45 1/31/2022 21:00 1.2 5 0.0 0.0 SURFAC, CASING RURD T Clear rig floor, R/U casing handling equipment. 1/31/2022 21:00 2/1/2022 00:00 3.0 0 0.0 0.0 SURFAC, CASING RGRP T Replace TDS-11 Hydraulic pump on TD. 2/1/2022 00:00 2/1/2022 00:30 0.5 0 0.0 0.0 SURFAC, CASING RGRP T Complete with Top drive hydraulic pump repairs. Work TD. Good. 2/1/2022 00:30 2/1/2022 02:00 1.5 0 0.0 0.0 SURFAC, CASING RURD T R/U casing handling equipment as per Casing crew. 2/1/2022 02:00 2/1/2022 04:30 2.5 0 0.0 87.0 SURFAC, CASING PUTB T PJSM - P/U 13 3/8" casing as per tally with Davis Lynch ECC Float Shoe Track assembly. . check floats all good 2/1/2022 04:30 2/1/2022 06:00 1.5 0 87.0 537.0 SURFAC, CASING PUTB T P/U and run 13 3/8 H563 casing 87' to 537' (Work thru tight spot at 536' with no issues) 2/1/2022 06:00 2/1/2022 10:00 4.0 0 537.0 1,617.0 SURFAC, CASING PUTB P Run13 3/8 H563 casing f/537' to 1,617' (Jt # 40 in the hole) 2/1/2022 10:00 2/1/2022 11:00 1.0 0 1,617.0 1,617.0 SURFAC, CASING CIRC P Circ 1X B/U w/1.5 - 6 pbm @ 135 psi. Reciprocate pipe 15'. 2/1/2022 11:00 2/1/2022 14:00 3.0 0 1,617.0 2,392.0 SURFAC, CASING PUTB P Run13 3/8 H563 casing f/1,617 to 2,392' P/U wt 177k / S/O wt 152k 2/1/2022 14:00 2/1/2022 16:00 2.0 0 2,392.0 2,434.0 SURFAC, CASING HOSO T M/U hanger as per FMC. Observe that the landing joint is 13-5/8" OD. Break circ with hanger above rotary table and circ w/2 bpm @ 200 psi and consult plan forward options with town. L/D hanger and M/U full space out joint. RIH to casing set point of 2,434' and circ and cond while wait on 13-3/8" landing joint to arrive on location. SIMOPS - Mobilize 13-3/8" landing joint from Doyon 25. 2/1/2022 16:00 2/1/2022 17:15 1.2 5 2,392.0 2,392.0 SURFAC, CASING CIRC T Circ and cond w/3 bpm @ 200 psi. Wash down to 2,434'. Pump out of hole and L/D single joint. 2/1/2022 17:15 2/1/2022 17:45 0.5 0 2,392.0 2,434.0 SURFAC, CASING HOSO P M/U hanger as per FMC. M/U 13-3/8" landing joint. Wash down at 2 bpm and land casing on hanger at 2,434' PU wt 177k / SO wt 152k 2/1/2022 17:45 2/1/2022 22:00 4.2 5 2,434.0 2,434.0 SURFAC, CEMENT CIRC P Circ and Condition mud for cement job as per Mud Engineer 3 BPM, 187 PSI, 35% F/O 4 BPM, 230 PSI, 41% F/O 5 BPM, 277 PSI, 45% F/O 6 BPM, 330 PSI, 45% F/O 7 BPM, 380 PSI, 47% F/O 8 BPM, 445 PSI, 48% F/O P/U WT= 176K, S/O WT= 150K 2/1/2022 22:00 2/2/2022 00:00 2.0 0 2,434.0 2,434.0 SURFAC, CEMENT CMNT P R/U cementers and PJSM on cement job. SLB pump 5 bbls H2O and PT lines 3,500 psi. (good). Pump 120 bbls 11.0 ppg mud push II. Shut down and drop bottom plug. 2/2/2022 00:00 2/2/2022 04:30 4.5 0 2,434.0 2,434.0 SURFAC, CEMENT CMNT P Pump 545 bbls 11 ppg 1669 stks 1.91 yield lead cement, Followed by 65 bbl 15.8 ppg 314 stks 1.16 yield tail cement,pump 20 bbls freshwater, shut down drop top plug, displace with rig pumps 331 bbls @ 5bpm 590 psi Full returns all job. bump plug 500psi over circ rate held for 5 min. bleed off check floats floats held CIP 4:15 hrs (380 bbls cement to surface) Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 9/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/2/2022 04:30 2/2/2022 09:00 4.5 0 2,434.0 2,434.0 SURFAC, WHDBOP RURD P Blow down and rig down CMT lines and equip. Back out and puill landing jt. Remove Volant tool clean and flush all surface equipment on floor and pits with black water, offload all cement returns from rock washer 2/2/2022 09:00 2/2/2022 12:00 3.0 0 2,434.0 2,434.0 SURFAC, WHDBOP CLEN P Cont. clean surface eequipment, Mud pits, clean Rock washer Pit #2 remove all casing running equipment from rig floor, Prep tools and equipment to nipple down 2/2/2022 12:00 2/2/2022 14:30 2.5 0 2,434.0 2,434.0 SURFAC, WHDBOP NUND P N/D surface riser and starting head, SIMOPS clean cement valves, Remove mud pump sution hoses for repair, continuue to clean out mud pits and rockwasher. 2/2/2022 14:30 2/3/2022 00:00 9.5 0 2,434.0 2,434.0 SURFAC, WHDBOP NUND P Install wellhead as per FMC reps. N/U stack SIMOPS Cont. to clean out mud pits and rockwasher, Install repaired mudline suctions, N/U MPD equipment install RCD and get measurements for welder to modify riser and trip nipple. 2/3/2022 00:00 2/3/2022 06:00 6.0 0 2,434.0 2,434.0 SURFAC, WHDBOP NUND P Cont, N/U BOPE / SIMOPS clean flowline dress shakers, Clean Rock Washer clean suction and discharge screens on mud pumps.Grease choke manifold, and standpipe valves. Prep Tools and Equipment toRig floor toTest BOPE. 2/3/2022 06:00 2/3/2022 12:00 6.0 0 2,434.0 2,434.0 SURFAC, WHDBOP NUND P Install and secure Katch Kan to stack Replace boot on riser installl trip nipple and remove for Modifications rig up test equip on floor, Grease choke manifold bring up test plug to rig floor running tools and wearing bushing to rig floor for thaw out Rigging up MPD equipment to RCD head Install trip nippleSIMOPS cont. with mud pump screen and prepping mud pits and rock washer for drill out. Take on new mud to pits, Perform derrick inspection 2/3/2022 12:00 2/3/2022 18:00 6.0 0 2,434.0 2,434.0 SURFAC, WHDBOP NUND P Cont. to perform Derrick inspection cont. to rig up testing equipment on rig floor Pressure test new mud suction lines. Test Good. Calibrate Aphion system, EZ torque line pull sensors as per nov tech. R/U MPD trip nipple and test with water. 2/3/2022 18:00 2/4/2022 00:00 6.0 0 2,434.0 2,434.0 SURFAC, WHDBOP BOPE P Test bope all tests t/ 250 low 5,000 high for 5 charted min. w/ exception of manual operated & super choke tested t/ 250 low & 2,000 psi for 5 charted min, and exception of annular tested t/ 250 low & 3,500psi. w/ 5" test jt test annular, 3 1/2" x 6" upr, 3 1/2" x 6" lpr, test choke valves 1-14, manual operated & super choke, choke & kill manuals & hcr's, witnessed by AOGCC REP BOB NOBLE Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 10/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/4/2022 00:00 2/4/2022 03:45 3.7 5 2,434.0 2,434.0 SURFAC, WHDBOP BOPE P Cont. test , 2" valve kill line on mezzanine, 5" fosv, 5" dart valve, upper & lower ibop; blind/ shear rams; perform koomey drawdown, acc = 3000 psi. manif. = 1600 psi. acc = 1850 psi after all functions on bottles, 20 sec for 200 psi. build w/ 2 elec. pumps, 68 sec t/ build full sys. pressure w/ 2 elec. & 2 air pumps, closing times annular = 15 sec. upr = 6 sec. blind / shears = 6 sec. lpr = 6 sec. choke hcr = 1 sec. kill hcr = 1 sec; test pvt gain/loss and flow out alarms, test lel and h2s alarms; witnessed by AOGCC REP BOB NOBLE 2/4/2022 03:45 2/4/2022 04:15 0.5 0 2,434.0 2,434.0 SURFAC, WHDBOP RURD P Blow down Bope testing equip. Blow down Choke and kill lines. Prep for testing MPD equipment 2/4/2022 04:15 2/4/2022 06:00 1.7 5 2,434.0 2,434.0 SURFAC, WHDBOP MPDA P Pull Riser install MPD test cap, Fill lines Terst MPD equip as per Beyond REP. test 250 low 1250 high 2/4/2022 06:00 2/4/2022 07:00 1.0 0 2,434.0 2,434.0 SURFAC, WHDBOP OTHR P Blow down MPD equipment PULL RCD test cap install trip nipple and clamp down pull test pull, install wear bushing ID 12.43 RILDS x2 2/4/2022 07:00 2/4/2022 12:00 5.0 0 2,434.0 2,434.0 SURFAC, WHDBOP RURD P Install Novos, W/ Repair Steam heater on rig floor get measurments install door safety chains for the beaver slides ops. Trouble shoot MWD sensors on standpipe clean and clear rig floor of all testing equip, House keeping in BOP deck and cellar areas, Bring drill out BHA to rig floor and prep for making up. Repair cable in trays in derrick. Load 4" drill pipe in pipe shed 2/4/2022 12:00 2/4/2022 13:30 1.5 0 2,434.0 2,434.0 SURFAC, WHDBOP SVRG P Install Novos while service ST-100 service top drive bring split master bushing to rig floor and install. Bring MPD bearing and Barrel to rig floor. Repair door on super choke panel 2/4/2022 13:30 2/4/2022 17:00 3.5 0 0.0 1,516.0 SURFAC, DRILLOUT BHAH P PJSM M/U #3 bha as per SLB DD and RIH to 1516' 2/4/2022 17:00 2/4/2022 18:00 1.0 0 1,516.0 1,516.0 SURFAC, DRILLOUT RURD P R/U all tools for testing casing and FIT. Rig up camera for EPA to winttness test. 2/4/2022 18:00 2/4/2022 18:30 0.5 0 1,516.0 1,516.0 SURFAC, DRILLOUT MPDA P Pull trip nipple Riser., Install MPD bearing P/U 89k S/O 91k 2/4/2022 18:30 2/4/2022 20:00 1.5 0 1,516.0 1,516.0 SURFAC, DRILLOUT MPDA P Commision MPD with driller and simulate connection 2/4/2022 20:00 2/4/2022 21:00 1.0 0 1,516.0 1,422.0 SURFAC, DRILLOUT MPDA P Blow down top-drive pull MPD bearing install trip nipple riser Pull 2 Stands 2/4/2022 21:00 2/4/2022 22:00 1.0 0 1,422.0 2,269.0 SURFAC, DRILLOUT TRIP P TIH from 1422' to 2269' P/U 104 S/O 109 2/4/2022 22:00 2/4/2022 22:30 0.5 0 2,269.0 2,288.0 SURFAC, DRILLOUT WASH P Wash down From 2269' to 2288' tag cement with 10k 104 P/U 109 S/O 2/4/2022 22:30 2/5/2022 00:00 1.5 0 2,285.0 2,285.0 SURFAC, DRILLOUT CIRC P Circulate B/U at 2285' Total strokes pumped 3213 2/5/2022 00:00 2/5/2022 00:30 0.5 0 2,285.0 2,285.0 SURFAC, DRILLOUT CIRC P Cont. Circulating B/U for casing test. Mud in and out 10 ppg 2/5/2022 00:30 2/5/2022 01:30 1.0 0 2,285.0 2,265.0 SURFAC, DRILLOUT TRIP P TOOH from 2287' to 2265' Blow down top -drive Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 11/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/5/2022 01:30 2/5/2022 03:00 1.5 0 2,265.0 2,265.0 SURFAC, DRILLOUT PRTS P PJSM R/u and test 13 3/8" casing to 3500 psi for 30 MIn w/ EPA rep Ryan Gross witnessing casing test via Teams total PSI 3532 Took 46 stokes 4.6 bbls achieve psi, Bleed back 4.4 bbls Good Test Blow down mud lines 2/5/2022 03:00 2/5/2022 03:30 0.5 0 2,265.0 2,288.0 SURFAC, DRILLOUT TRIP P TIH to 2288' P/U 111 S/O 109 2/5/2022 03:30 2/5/2022 10:00 6.5 0 2,288.0 2,344.0 SURFAC, DRILLOUT COCF P Drill cement and float equip from 2288' to 2437' @ float WOB 15 RT 45 TQ 4.5 GPM 500 P/U 111 S/O 109 2/5/2022 10:00 2/5/2022 11:00 1.0 0 2,344.0 2,457.0 SURFAC, DRILLOUT DDRL P Drill 20 ' of new formation from 2344' to 2457' @ float WOB 15 RT 15 TQ 4.5 GPM 600 P/U 111 S/O 109 PSI 1050 2/5/2022 11:00 2/5/2022 12:00 1.0 0 2,457.0 2,457.0 SURFAC, DRILLOUT CIRC P ROT and RECIP CBU for FIT while racking stand to 2367' GPM 680 PSI 1280 RPM 60 TQ 4k 2/5/2022 12:00 2/5/2022 15:00 3.0 0 2,457.0 2,457.0 SURFAC, DRILLOUT FIT P Bd td, rig up for fit, flood kill and cement line, pump 20 stks to 730 psi, @ 5 spm hold for 10 min. 1/2 bbl bleed back, blow down equip. rig up again pump 28 stks t/ 730 psi, @ 5 spm 1/2 bbl bled back, rig down and blow down, decision made t/ run back to bottom and swap t/ lsnd mud 2/5/2022 15:00 2/5/2022 15:30 0.5 0 2,457.0 2,457.0 SURFAC, DRILLOUT DISP P Pump 38 bbls of hi vis spacer, followed by 10 ppg lsnd 3660tot. stks, rack back 1 std t/ 2,363', pu= 109k 2/5/2022 15:30 2/5/2022 16:00 0.5 0 2,457.0 2,457.0 SURFAC, DRILLOUT RURD P Bd. td. rig up for fit 2/5/2022 16:00 2/5/2022 17:30 1.5 0 2,457.0 2,457.0 SURFAC, DRILLOUT FIT P Flood kill and cement lines, pump 32 stks t/ 709 psi @ 5 spm hold for 10 min, 1 bbl bleed back, decision made to try again, pump 23 stks @ 8 spm t/ 730 psi hold 10 min. 1.5 bbls bleed back, lot @ 14.9 2/5/2022 17:30 2/5/2022 18:00 0.5 0 2,457.0 2,457.0 SURFAC, DRILLOUT RURD P Blow down and rig down all testng equipment 2/5/2022 18:00 2/5/2022 18:30 0.5 0 2,457.0 2,457.0 SURFAC, DRILLOUT RURD P Cont rig down test equipment and mpd lines, 2/5/2022 18:30 2/5/2022 19:30 1.0 0 2,457.0 2,457.0 INTRM1, DRILL CIRC P Build and Pump dry job 30bbls 25spm 75psi , blow down OWFF 15 min well static 2/5/2022 19:30 2/5/2022 21:30 2.0 0 2,457.0 647.0 INTRM1, DRILL TRIP P Tooh f/2360' t/647'md puw=106k 2/5/2022 21:30 2/6/2022 00:00 2.5 0 647.0 90.0 INTRM1, DRILL BHAH P Break down bha per SLB DD f/647'md 2/6/2022 00:00 2/6/2022 01:00 1.0 0 90.0 0.0 INTRM1, DRILL BHAH P L/D drill colars and bit Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 12/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/6/2022 01:00 2/6/2022 02:30 1.5 0 0.0 0.0 INTRM1, DRILL BHAH P Clean and clear rig floor stage Directional tools to rig floor 2/6/2022 02:30 2/6/2022 06:00 3.5 0 0.0 90.0 INTRM1, DRILL BHAH P P/U SLB Directional Power drive, 9 7/8" bit and stabs. 2/6/2022 06:00 2/6/2022 10:00 4.0 0 90.0 711.0 INTRM1, DRILL BHAH P Cont. P/U BHA #4 as per SLB REPS f/ 90' to 711' 40k under jars 2/6/2022 10:00 2/6/2022 11:00 1.0 0 711.0 2,407.0 INTRM1, DRILL TRIP P TIH f/ 711' to 2407' S/O 100k Shallow test 1650' good test 2/6/2022 11:00 2/6/2022 12:00 1.0 0 2,407.0 2,457.0 INTRM1, DRILL REAM P Ream F/ 2407' to 2457' w/ 700 gpm , 1520 psi, 30rpm, 3k TQ, P/U 2450' DD sent 1st down link for smart tools 2/6/2022 12:00 2/6/2022 12:30 0.5 0 2,457.0 2,457.0 INTRM1, DRILL DDRL P Cont. Down link RSS with SLB DD's 2/6/2022 12:30 2/6/2022 18:00 5.5 0 2,457.0 2,626.0 INTRM1, DRILL DDRL P Drill intermediate hole f/ 2,457‘ md - t/ 2626‘ md 2500‘ tvd, wob =1-3, gpm =750, psi on =1450, psi off =1430, rpm =100, trq on =4-5, trq off =3, flow out =63 %, ecd =10.45 ppg, p/u wt = 108k, s/o wt = 120k, rt wt =109k. @ 2607' dropped 1.25" ball and activated reamer. Attempted to perform ledge test, but un-successful due to soft formation. All other indications is reamer functioning properly. Base Parameters: Reamer closed = 720 gpm, 1645 psi, 80 rpm, 4 k ft/lbs trq, TRPM = 2890 Reamer open = 720 gpm, 1323 psi, 80 rpm, 7 k ft/lbs trq, TRPM = 2422 2/6/2022 18:00 2/7/2022 00:00 6.0 0 2,626.0 3,160.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 2626‘ md - t/3160 ‘ md 2985‘ tvd, wob =8, gpm =750, psi on =1580, psi off =1571, rpm =140, tq on =5, tq off =2, flow out =64 %, ecd =10.71 ppg, p/u wt =113 k, s/o wt =132 k, rt wt =124 k, adt =7.38, total bit hrs =7.38, total jar hrs =32.06, 2/7/2022 00:00 2/7/2022 06:00 6.0 0 3,160.0 3,632.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 3160 md to 3632' , wob =8, gpm =750, psi on =1580, psi off =1571, rpm =140, tq on =5, tq off =2, flow out =64 %, ecd =10.71 ppg, p/u wt =113 k, s/o wt =132 k, rt wt =124 k, 2/7/2022 06:00 2/7/2022 09:00 3.0 0 3,632.0 3,632.0 INTRM1, DRILL CIRC T Shut in mud pump #2 and circ and cond on mud pump #1 while trouble shoot mud pump #2 fluid end block w/380 gpm, 515 psi, 20 rpm, 3-4 k trq. Decision to POOH to shoe. 2/7/2022 09:00 2/7/2022 10:30 1.5 0 3,632.0 2,407.0 INTRM1, DRILL TRIP T 3,632' to 2,407' P/U wt 108k 2/7/2022 10:30 2/7/2022 15:30 5.0 0 2,407.0 2,407.0 INTRM1, DRILL RGRP T Replace fluid end block on mud pump #2. PT to 3,700 psi (good) 2/7/2022 15:30 2/7/2022 17:15 1.7 5 2,407.0 3,632.0 INTRM1, DRILL TRIP T RIH f/2,407' to 3,632' W&R down last stand w/750 gpm, 500 psi. 2/7/2022 17:15 2/7/2022 17:45 0.5 0 3,632.0 3,632.0 INTRM1, DRILL SVRG P Rig Service Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 13/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/7/2022 17:45 2/8/2022 00:00 6.2 5 3,632.0 4,112.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 3632' to 4112' , wob =13, gpm =750, psi on =1898, psi off =1571, rpm =140, tq on =8, tq off =5, flow out =64 %, ecd =10.64 ppg, p/u wt =132 k, s/o wt =151 k, rt wt =134 k, ADT 3.35 Tota Bit Hrs 14.29 Jar Hrs 31.25 2/8/2022 00:00 2/8/2022 03:00 3.0 0 4,112.0 4,384.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 4112' to 4384' , wob =13, gpm =750, psi on =1898, psi off =1571, rpm =140, tq on =8, tq off =5, flow out =64 %, ecd =10.64 ppg, p/u wt =132 k, s/o wt =151 k, rt wt =134 k, ADT 3.35 Tota Bit Hrs 14.29 Jar Hrs 31.25 2/8/2022 03:00 2/8/2022 04:00 1.0 0 4,384.0 4,384.0 INTRM1, DRILL RGRP T Trouble shoot Top-drive Electrical ABB box.(VFD) 2/8/2022 04:00 2/8/2022 06:00 2.0 0 4,384.0 4,478.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 4384' to 4478' , wob =13, gpm =750, psi on =1898, psi off =1571, rpm =140, tq on =8, tq off =5, flow out =64 %, ecd =10.64 ppg, p/u wt =132 k, s/o wt =151 k, rt wt =134 k, ADT 3.35 Tota Bit Hrs 14.29 Jar Hrs 31.25 2/8/2022 06:00 2/8/2022 07:00 1.0 0 4,478.0 4,478.0 INTRM1, DRILL SVRG P Service top drive, drawworks, st- 100 2/8/2022 07:00 2/8/2022 08:30 1.5 0 4,478.0 4,573.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 4,478‘ md - t/ 4,573‘ md ‘ tvd 4,311, wob =10-15, gpm =750, psi on =2,000, psi off = 1,990, rpm =140, tq on =7-10, tq off =3-4, flow out = 63%, ecd = 10.60ppg, p/u wt = 140k, s/o wt = 158k, rt wt = 135k, 2/8/2022 08:30 2/8/2022 10:00 1.5 0 4,573.0 4,573.0 INTRM1, DRILL CIRC T Circ and recip pipe @ 750 gpm, 1950 psi, 20 rpm 3k tq while waiting on schlumberger mwd computer system 2/8/2022 10:00 2/8/2022 12:00 2.0 0 4,573.0 4,764.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 4,573‘ md - t /4,764 ‘ md 4420 ‘ tvd, wob =13, gpm =750, psi on =1990, psi off =1980, rpm =140, tq on =8, tq off =5, flow out =62 %, ecd =10.81 ppg, p/u wt =132 k, s/o wt = 162k, rt wt =145 k,adt=5.57 total bit hrs=19.86 total jar hrs=44.54 2/8/2022 12:00 2/8/2022 18:00 6.0 0 4,764.0 5,141.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 4,764'‘ md - t/ 5,141‘ md, 4,742' tvd, wob =14k, gpm =750, psi on =1,920, psi off =1,910, rpm =140, tq on =8-10k, tq off =3-4k, flow out = 63 %, ecd = 10.64 ppg, p/u wt = 141k, s/o wt = 168k, rt wt = 151k 2/8/2022 18:00 2/9/2022 00:00 6.0 0 5,141.0 5,579.0 INTRM1, DRILL DDRL P Drill 9 7-8" x 11" intermediate hole w/ rhino under reamer f/ 5141‘ md - t/ 5579‘ md 5128‘ tvd, wob =11k, gpm = 750, psi on = 1847, psi off = 1842, rpm = 170, tq on = 6, tq off = 5k, flow out = 64%, ecd = 10.45 ppg, p/u wt = 155k, s/o wt = 171k, rt wt = 153k, adt = 5.96, total bit hrs = 25.82, total jar hrs = 50.50, Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 14/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/9/2022 00:00 2/9/2022 06:00 6.0 0 5,579.0 5,809.0 INTRM1, DRILL DDRL P Drill 9 7-8" x 11" intermediate hole w/ rhino under reamer f/ 5579‘ to 5820' md , wob =11k, gpm = 750, psi on = 1847, psi off = 1842, rpm = 170, tq on = 6, tq off = 5k, flow out = 64%, ecd = 10.45 ppg, p/u wt = 155k, s/o wt = 171k, rt wt = 153k, , total bit hrs = 31, total jar hrs = 56., 2/9/2022 06:00 2/9/2022 10:00 4.0 0 5,809.0 5,897.0 INTRM1, DRILL DDRL P Drill 9 7-8" x 11" intermediate hole w/ rhino under reamer f/ 5,809‘ md - t/ 5,897‘ md ‘ tvd 5,444', wob =8-10k, gpm =750, psi on =1,911, psi off =1,900, rpm =140- 170, tq on =2-16k, tq off =4-5k, flow out = 64%, ecd = 10.28ppg, p/u wt = 152k, s/o wt = 183k, rt wt =155 k, adt =8.62, total bit hrs =34.44, total jar hrs =57.06 2/9/2022 10:00 2/9/2022 10:30 0.5 0 5,897.0 5,897.0 INTRM1, DRILL SVRG P Service top drive, wash pipe, and blocks 2/9/2022 10:30 2/9/2022 12:00 1.5 0 5,897.0 5,897.0 INTRM1, DRILL RGRP T Inspect top drive encoder j-box wiring, clean encoder housing, re-install heating pad for encoder, re-id encoder to traction motors 2/9/2022 12:00 2/9/2022 18:00 6.0 0 5,897.0 6,056.0 INTRM1, DRILL DDRL P Drill 9 -78" x 11" intermediate hole w/ rhino under reamer f/ 5,897‘ md - t/ 6,056‘ md ‘ tvd=5,582', wob =9-10k, gpm =750, psi on =1930, psi off =, rpm =140, tq on =2-16, tq off =4-5, flow out = 64%, ecd =10.44 ppg, p/u wt = 152k, s/o wt = 182k, rt wt = 162k 2/9/2022 18:00 2/10/2022 00:00 6.0 0 6,056.0 6,536.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11” intermediate hole w/ rhino under reamer f/ 6056‘ md - t/ 6536‘ md ‘ tvd, wob =21k, gpm = 750, psi on = 2044, psi off = 2041, rpm =, tq on = 14k, tq off = 5k, flow out = 64%, ecd = 10.65 ppg, p/u wt = 171k, s/o wt = 184k, rt wt = 172k, adt = 8.79, total bit hrs = 43.26, total jar hrs = 67.94 2/10/2022 00:00 2/10/2022 07:00 7.0 0 6,536.0 6,934.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11” intermediate hole w/ rhino under reamer f/ 6536‘ md to 6934' md 6286' tvd, wob =21k, gpm = 750, psi on = 2044, psi off = 2041, rpm = 140, tq on = 14k, tq off = 5k, flow out = 64%, ecd = 10.65 ppg, p/u wt = 171k, s/o wt = 184k, rt wt = 172k, , total bit hrs = 49.26, total jar hrs = 73.94 2/10/2022 07:00 2/10/2022 08:30 1.5 0 6,934.0 6,934.0 INTRM1, DRILL SRVY T Attempt to MWD survey. Getting magnetic interference with polar magnetic storm. 2/10/2022 08:30 2/10/2022 12:00 3.5 0 6,934.0 7,153.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11” intermediate hole w/ rhino under reamer f/ 6934‘ md to 7,153' md, 6,527' tvd, wob =17k, gpm = 745, psi on = 2175, psi off = 2280, rpm 140 =, 7-17 k tq on = 7-8 k tq off, flow out = 63%, ecd = 10.86 ppg, p/u wt = 176k, s/o wt = 203k, rt wt = 194k, total bit hrs = 49.91, total jar hrs = 78.89 hrs 2/10/2022 12:00 2/10/2022 14:30 2.5 0 7,153.0 7,153.0 INTRM1, EVALWB CIRC P Circulate and condition to 11.0 ppg w/750 gpm, 2519 psi, 140 rpm, 7-8 k trq Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 15/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/10/2022 14:30 2/10/2022 15:00 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB UREM P Drop 1.625" ball and close reamer. Base Parameters: Reamer open = 750 gpm, 2519 psi, TRPM = 2656 Reamer closed = 750 gpm, 2747 psi, TRPM = 3125 2/10/2022 15:00 2/10/2022 17:30 2.5 0 7,153.0 7,153.0 INTRM1, EVALWB RGRP T Pump at 340 gpm, 680 psi and Trouble shoot top drive. C/O top drive encoder. 2/10/2022 17:30 2/10/2022 18:00 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB CIRC P SPRS' and B/D top drive. F/C (staic) 2/10/2022 18:00 2/10/2022 22:30 4.5 0 7,153.0 7,153.0 INTRM1, EVALWB TRIP P POOH on elevators f/7153' to 6708'. Pump dry job. Cont. POOH f/6708' to 2750' tight hole 25k over pull 2/10/2022 22:30 2/11/2022 00:00 1.5 0 7,153.0 7,153.0 INTRM1, EVALWB BKRM P BROOH from 2750' to 2645' @ 700 GPM 1800 psi, 15 RPM, 4k TQ 63% F/O P/U 112 S/O 114 2/11/2022 00:00 2/11/2022 01:30 1.5 0 7,153.0 7,153.0 INTRM1, EVALWB REAM P Cont. to REAM out hole f/ 2645' to 2434' @ 700 GPM 1774 PSI 15 RPM due to tight hole issuses 2/11/2022 01:30 2/11/2022 02:00 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB CIRC P CIrculate Bottoms up A 2434' 700 GPM 1774 PSI 15 RPM to ensure well bore is clean. 2/11/2022 02:00 2/11/2022 04:00 2.0 0 7,153.0 7,153.0 INTRM1, EVALWB TRIP P Cont. to TOOH f/ 2434' to SLB BHA @ 724' 2/11/2022 04:00 2/11/2022 08:00 4.0 0 7,153.0 7,153.0 INTRM1, EVALWB BHAH P L/D BHA as per SLB directional hand 2/11/2022 08:00 2/11/2022 09:00 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB RURD P Clean and Clear all Directional BHA from rig floor 2/11/2022 09:00 2/11/2022 12:00 3.0 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG P PJSM R/U SLM wireline equipment and tools 2/11/2022 12:00 2/11/2022 13:00 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG P RIH with wireline tools test wireline tools 2/11/2022 13:00 2/11/2022 15:00 2.0 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG P RIH with wirewline tools f/ surface to 2050' tagged up worked down to 2080' 2/11/2022 15:00 2/11/2022 16:30 1.5 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG T POOH w/ wireline R/D tools in pipe shed 2/11/2022 16:30 2/11/2022 19:45 3.2 5 7,153.0 7,153.0 INTRM1, EVALWB RURD T Clean and clear wire line tools from rig floor, Prep tools for clean out run, Install heater on topdrive and warm up same. 2/11/2022 19:45 2/11/2022 21:30 1.7 5 7,153.0 7,153.0 INTRM1, EVALWB BHAH T P/U Clean out BHA as per SLB from surface to 568' 2/11/2022 21:30 2/11/2022 23:15 1.7 5 7,153.0 7,153.0 INTRM1, EVALWB TRIP T TIH out of derrick f/ 568' to 2124' MD 2/11/2022 23:15 2/12/2022 00:00 0.7 5 7,153.0 7,153.0 INTRM1, EVALWB REAM T @ 2124' MD encounter trouble spot set down 10k wash and ream down to 2223' MD at 800 GPM 1592 PSAI 67% F/O 80 RPM 3K TQ S/O 101 Monitoring dispalcement at Via Pits #1-5 2/12/2022 00:00 2/12/2022 01:00 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB REAM T Wash and Ream down f/ 2223 toi 2449' MD at 800 GPM 1592 PSAI 67% F/O 80 RPM 3K TQ S/O 101 Monitoring dispalcement at Via Pits #1-5 2/12/2022 01:00 2/12/2022 02:00 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB CIRC T Circ,Rot And Recip pipe f/ 2434' to 2411' @ 890 GPM 1988 PSI P/U 98K S/O 111K Pump 40 hi vis nut plug sweep. Observe no increase in cutting at shaker Total srokes pumped 7987 812 bbls 2/12/2022 02:00 2/12/2022 03:45 1.7 5 7,153.0 7,153.0 INTRM1, EVALWB TRIP T OWFF well static, POOH on elevators f/ 2434' to 568' 2/12/2022 03:45 2/12/2022 05:30 1.7 5 7,153.0 7,153.0 INTRM1, EVALWB BHAH T L/D clean out Bha as per SLB DD f/ 568' to surface Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 16/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/12/2022 05:30 2/12/2022 07:00 1.5 0 7,153.0 7,153.0 INTRM1, EVALWB RURD T Clear and Clean BHA from rig floor 2/12/2022 07:00 2/12/2022 09:00 2.0 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG T Prep tools wireline tools in Pipe shed,Simops replace Mud Pump # 2 Discharge manifold 4 way block 2/12/2022 09:00 2/12/2022 13:30 4.5 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG P RIH w/ wireline USIT log f/ surface to 2434' MD cont. SIMOPS on #2 Mud Pump discharge pump 2/12/2022 13:30 2/12/2022 14:30 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB ELOG P POOH w/ wireline f/ 2434' to surface verify USIT log prior to breaking down assy. 2/12/2022 14:30 2/12/2022 16:30 2.0 0 7,153.0 7,153.0 INTRM1, EVALWB RURD P R/D SLB wireline sheaves and tools, clean clear tools f/ rig floor 2/12/2022 16:30 2/12/2022 17:30 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB RGRP T Trouble shoot and replace Faulty SLB trasducer on mud manifold at gooseneck. install insulted blanket around gooseneck area 2/12/2022 17:30 2/12/2022 18:30 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB RGRP P Rig service Change out seal on top gear oil pump fill Hydraulic tank and change filter. 2/12/2022 18:30 2/12/2022 21:15 2.7 5 7,153.0 7,153.0 INTRM1, EVALWB WWWH P Pump ot stack, Remove wearring as per FMC hand wash out Wellhead and BOPE stack 2/12/2022 21:15 2/12/2022 22:30 1.2 5 7,153.0 7,153.0 INTRM1, EVALWB WWSP P Dummy run 7 5/8" hanger and landing jt as per FMC 2/12/2022 22:30 2/13/2022 00:00 1.5 0 7,153.0 7,153.0 INTRM1, EVALWB RURD P Set Test Plug per FMC REP and R/U t/ test BOPE 2/13/2022 00:00 2/13/2022 06:00 6.0 0 7,153.0 7,153.0 INTRM1, EVALWB BOPE P Test bope all tests t/ 250 low 4500 high for 5 charted min. w/ exception of manual operated & super choke tested t/ 250 low & 2,000 psi for 5 charted min, and exception of annular tested t/ 250 low & 3,500psi. w/ 5" test jt test annular, 3 1/2" x 6" upr, 3 1/2" x 6" lpr, test choke valves 1-14, manual operated & super choke, choke & kill manuals & hcr's, Cont. test , 2" valve kill line on mezzanine, 5" fosv, 5" dart valve, upper & lower ibop; blind/ shear rams; perform koomey drawdown, acc = 3000 psi. manif. = 1600 psi. acc = 1850 psi after all functions on bottles, 20 sec for 200 psi. build w/ 2 elec. pumps, 68 sec t/ build full sys. pressure w/ 2 elec. & 2 air pumps, closing times annular = 15 sec. upr = 6 sec. blind / shears = 6 sec. lpr = 6 sec. choke hcr = 1 sec. kill hcr = 1 sec; Test pvt,gain/loss and flow out alarms. Test LEL and H2S alarms AOGCC REP Guy Cook waived witness 08:32 hr 2-10-22 2/13/2022 06:00 2/13/2022 06:30 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB RURD P R/D bope test equipment 2/13/2022 06:30 2/13/2022 07:00 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB WWSP P FMC hand remove test plug and install wear ring ID 12.43" 2/13/2022 07:00 2/13/2022 08:00 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB BHAH P Bring up SLB BHA tools to rig floor, Organize other SLB BHA tools in tool shed. SIMOPS check TD koomy boootle pressure 2/13/2022 08:00 2/13/2022 08:30 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB RGRP T Fill IBOP koomy bottle t/ 800 psi., Confirm counter balance to 900 psi and system to 800 psi Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 17/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/13/2022 08:30 2/13/2022 12:30 4.0 0 7,153.0 7,153.0 INTRM1, EVALWB BHAH P M/U interrmediate BHA #6 T/ 743' as per SLB DD monitor well on Trip Tank 2/13/2022 12:30 2/13/2022 13:30 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB TRIP P TIH f/ 743' to 2125' MD monitor returns Via Trip Tank. 2/13/2022 13:30 2/13/2022 14:30 1.0 0 7,153.0 7,153.0 INTRM1, EVALWB DDRL P Down link directional tools 700 Gpm 1889 Psi 62% F/O down link to 0 degs. 100% 2/13/2022 14:30 2/13/2022 14:45 0.2 5 7,153.0 7,153.0 INTRM1, EVALWB RURD P Blow Down Top Drive 2/13/2022 14:45 2/13/2022 21:00 6.2 5 7,153.0 7,153.0 INTRM1, EVALWB TRIP P TIH f/ 2125' to 6936' Monitor well via Trip Tank Filling Every 20 stands P/U @ shoe 180k S/O 161k 2/13/2022 21:00 2/13/2022 22:45 1.7 5 7,153.0 7,153.0 INTRM1, EVALWB CIRC P Rot and Recip f/ 6936' to 6841' Circulate B/U @ 750 GPM 2832 PSI 64% F/O 120 RPM 7K Strokes pumped 14914 Stks 1516 BBLs Due to thick mud, Mud weight in and 11.0 ppg 2/13/2022 22:45 2/14/2022 00:00 1.2 5 7,153.0 7,153.0 INTRM1, EVALWB RURD P B/D top drive, R/U to install MPD Bearing and Drill nipple as per Beyond hand. @ 6936' 2/14/2022 00:00 2/14/2022 00:30 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB SVRG T Rig service to Change out Hand warmers around Encoder 2/14/2022 00:30 2/14/2022 02:00 1.5 0 7,153.0 7,153.0 INTRM1, EVALWB MPDA P Cont. to install MPD bearing and Drill nipple as per MPD REP. verify and Adjust MPD componets, RIH 1 Stand 6936' to 7030' S/O 178k 2/14/2022 02:00 2/14/2022 04:45 2.7 5 7,153.0 7,153.0 INTRM1, EVALWB CIRC T MPD trouble shooting Flow out Meter on computer on rig floor Rot. Recip,and circulate f/ 7030' t/ 6936 @ 400 GPM 1050 PSI 60 RPM 60 F/O 2/14/2022 04:45 2/14/2022 05:15 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB WASH T Wash down another stand from 7030' to 7120' While trouble shooting MPD 2/14/2022 05:15 2/14/2022 06:00 0.7 5 7,153.0 7,153.0 INTRM1, EVALWB CIRC T MPD trouble shooting Flow out Meter on computer on rig floor Rot. Recip,and circulate f/7120 to 7030' MD @ 400 gpm 1050 psi 60 rpm 60% f/o 2/14/2022 06:00 2/14/2022 06:30 0.5 0 7,153.0 7,153.0 INTRM1, EVALWB CIRC P SLB sending down links 750 gpm 3030 psi 20 rpm 9k tq @ 62% f/o 2/14/2022 06:30 2/14/2022 07:00 0.5 0 7,153.0 7,153.0 INTRM1, DRILL RGRP T Rack a stand back change hand warmer on encoder RIH to 7153' MD 2/14/2022 07:00 2/14/2022 07:30 0.5 0 7,153.0 7,124.0 INTRM1, DRILL DDRL P Drill 9 5/8" interm hole from 7153' to 7163' With Reamer closed, 750 gpm 3030 psi 100 rpm 9k tq, @62% f/o Rack back a stand to 7124' 2/14/2022 07:30 2/14/2022 08:00 0.5 0 7,124.0 7,124.0 INTRM1, DRILL DDRL P Drop 1.25" ball down string pump 250 gpm 621 psi f/ 300stks slow down t/ 100 gpm ball o0n seat @ 472 stks, Press up 1500 psi Reamer is in open position Tribine speed before 29960 After opening 2500 2/14/2022 08:00 2/14/2022 12:00 4.0 0 7,124.0 7,328.0 INTRM1, DRILL DDRL P Ledge test good, Drill 9 7/8" x 11" intermiate w/ rhino reamer f/ 7163' to 7328' ‘ md 6666 .1‘ tvd, wob = 16k, gpm = 750, psi on =2560, psi off = 2552, rpm = 160, tq on = 15k, tq off = 9k, flow out = 63%, ecd = ppg, p/u wt = 188k, s/o wt = 194k, rt wt = 184k, adt = 3.26, total bit hrs = 53.17, total jar hrs = 112.45, mpd connection back psi = 280 Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 18/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/14/2022 12:00 2/14/2022 18:00 6.0 0 7,328.0 7,690.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 7328‘ md - t/ 7690‘ md 7034‘ tvd, wob = 25k, gpm = 750, psi on = 2700, psi off = 2698, rpm = 150, tq on = 14k, tq off = 9k, flow out = 64%, ecd = 11.74 ppg, p/u wt = 194k, s/o wt = 185k, rt wt = 192k, adt = 4.15, total bit hrs = 57.32, total jar hrs = 116.6, mpd connection back psi = 280 psi 2/14/2022 18:00 2/15/2022 00:00 6.0 0 7,690.0 8,000.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 7,690‘ md - t/ 8,000‘ md 7,315‘ tvd, wob = 14k, gpm = 750, psi on = 2,758, psi off = 2,791, rpm = 170, tq on = 13k, tq off = 7k, flow out = 64%, ecd = 11.69 ppg, p/u wt = 199k, s/o wt = 192k, rt wt = 201k, adt = 5.06, total bit hrs = 62.38, total jar hrs = 121.66, mpd connection back psi = 280 psi 2/15/2022 00:00 2/15/2022 06:00 6.0 0 8,000.0 8,164.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 8,000‘ md to 8164' , 7844 tvd wob = 14k, gpm = 750, psi on = 2,758, psi off = 2,791, rpm = 170, tq on = 13k, tq off = 7k, flow out = 64%, ecd = 11.69 ppg, p/u wt = 199k, s/o wt = 192k, rt wt = 201k,, mpd connection back psi = 280 psi 2/15/2022 06:00 2/15/2022 12:00 6.0 0 8,164.0 8,384.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 8164' to 8384, 7695 tvd wob = 14k, gpm = 750, psi on = 2,758, psi off = 2,791, rpm = 170, tq on = 13k, tq off = 7k, flow out = 64%, ecd = 11.69 ppg, p/u wt = 199k, s/o wt = 192k, rt wt = 201k,, mpd connection back psi = 280 psi 2/15/2022 12:00 2/15/2022 18:00 6.0 0 8,384.0 8,520.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 8,384‘ md t/ 8,520‘ md, 7,831‘ tvd, wob = 20k, gpm = 850, psi on = 3,330, psi off = 3,340, rpm = 180, tq on = 14-20k, tq off = 11k, flow out = 66%, ecd = 11.29 ppg, connection back psi = 350 2/15/2022 18:00 2/15/2022 19:00 1.0 0 8,520.0 8,537.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 8,520‘ md t/ 8,537‘ md, 7,848‘ tvd, wob = 17k, gpm = 850, psi on = 3,453, psi off = 3,452, rpm = 180, tq on = 14k, tq off = 11k, flow out = 67%, ecd = 11.48 ppg, connection back psi = 350 2/15/2022 19:00 2/15/2022 19:30 0.5 0 8,537.0 8,537.0 INTRM1, DRILL CIRC T @ 8,537' md circulate and condition mud @ 750 gpm, 2,863 psi, 65% f/o. obtain mud weights w/ new pressurized scale, prior scale had gotten broken. 2/15/2022 19:30 2/16/2022 00:00 4.5 0 8,537.0 8,633.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 8,537‘ md t/ 8,633‘ md, 7,944‘ tvd, wob = 24, gpm = 850, psi on = 3,468, psi off = 3,450, rpm = 180, tq on = 16k, tq off = 11k, flow out = 64%, ecd = 11.56 ppg, p/u wt = 222k, s/o wt = 202k, rt wt = 207k, adt = 8.80, total bit hrs = 82.39, total jar hrs = 101.72, mpd connection back psi = 350 Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 19/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/16/2022 00:00 2/16/2022 06:00 6.0 0 8,633.0 8,802.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/ 8,633‘ md, to 8802' 8125‘ tvd, wob = 24, gpm = 850, psi on = 3,468, psi off = 3,450, rpm = 180, tq on = 16k, tq off = 11k, flow out = 64%, ecd = 11.56 ppg, p/u wt = 222k, s/o wt = 202k, rt wt = 207k, adt = 8.80, total bit hrs = 82.39, total jar hrs = 101.72, mpd connection back psi = 350 2/16/2022 06:00 2/16/2022 12:00 6.0 0 8,802.0 8,995.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/, to 8802'md to 8995' md 8311‘ tvd, wob = 24, gpm = 850, psi on = 3,468, psi off = 3,450, rpm = 180, tq on = 16k, tq off = 11k, flow out = 64%, ecd = 11.66 ppg, p/u wt = 252k, s/o wt = 205k, rt wt = 214k, adt = 10.34, total bit hrs = 92.73, total jar hrs = 112.03 mpd connection back psi = 115 2/16/2022 12:00 2/16/2022 18:00 6.0 0 8,995.0 9,277.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/, 8995' md to 9277' md 8600‘ tvd, wob = 24, gpm = 850, psi on = 3,663, psi off = 3,569, rpm = 180, tq on = 16k, tq off = 11k, flow out = 64%, ecd = 11.66 ppg, p/u wt = 252k, s/o wt = 205k, rt wt = 214k, adt = 10.34, total bit hrs = 92.73, total jar hrs = 112.03 mpd connection back psi = 115 2/16/2022 18:00 2/16/2022 21:00 3.0 0 9,277.0 9,383.0 INTRM1, DRILL DDRL P Drill 9 7/8" x 11" intermediate hole w/ rhino under reamer f/, 9277' md to 9383' 8691‘ tvd, wob = 24, gpm = 850, psi on = 3,663, psi off = 3,569, rpm = 180, tq on = 16k, tq off = 11k, flow out = 64%, ecd = 11.66 ppg, p/u wt = 252k, s/o wt = 205k, rt wt = 214k, adt = 10.34, total bit hrs = 92.73, total jar hrs = 112.03 mpd connection back psi = 115 2/16/2022 21:00 2/17/2022 00:00 3.0 0 9,383.0 9,383.0 INTRM1, CASING CIRC P Pump 40 Hi vis sweep circulate hole clean, circulate hole clean, at each bottoms up rack a stand back while weighting up mud in mud pits. @ 850 gpm, 3628 psi 63% f/o 13 k tq, 120 rpm Note Sweep at suface cutting increased slightly for a 5 min. back to normal. 2/17/2022 00:00 2/17/2022 03:00 3.0 0 9,383.0 9,383.0 INTRM1, CASING CIRC P Cont. Rotating and Recip @ 9383' while weighting up mud system to 11.5ppg from m 10.9 ppg keeping ECD below 12.1 ppg w/ 850 gpm 3638 psi 63% f/o 120 rpm 13k tq 33445 strokes total 2/17/2022 03:00 2/17/2022 03:15 0.2 5 9,383.0 9,383.0 INTRM1, CASING OWFF P Flow check well, well static Simops Drop Reamer closing ball and allow to fall to ball seat 2/17/2022 03:15 2/17/2022 03:45 0.5 0 9,383.0 9,383.0 INTRM1, CASING OWFF P Drop Reamer closing ball and allow to fall to ball seat. Pump ball down @ 100 gpm 220 psi 33% f/o @ 162 strokes increase in psi t/ 650 walk pump up t/1829 psi and observe pressure drop t/ 380 psi bring rate up t/ 650 gpm 2629 psi 64 % f/o 5 rpm 6 k tq turbine rpm 2695 confirm reamer is closed 2/17/2022 03:45 2/17/2022 04:00 0.2 5 9,383.0 9,383.0 INTRM1, CASING CIRC P SPR @ 9381' w/ 11.5 ppg mud Lining up back side pump and cellar pump Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 20/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/17/2022 04:00 2/17/2022 08:00 4.0 0 9,383.0 9,383.0 INTRM1, CASING SMPD P SOOH f/ 9383' to 8110'' @ 30 fpm As per MPD holding 11.5 ppg ECD. MPD holding 70 psi out slips and 10 psi in slips, Monitoring hole via pit #3-5 40k over pull @ 8110' 2/17/2022 08:00 2/17/2022 12:00 4.0 0 9,383.0 9,383.0 INTRM1, CASING REAM P M/U top drive stage up pumps and Ream f/ 8110' to 7776' @ 700 gpm 2900 psi 30 rpm 8k tq 64% f/o 2/17/2022 12:00 2/17/2022 15:00 3.0 0 9,383.0 9,383.0 INTRM1, CASING REAM P BROOH f/ 7776' to 7599' 700 gpm 2899 psi 30 rpm 9k tq 64% f/o 2/17/2022 15:00 2/17/2022 15:30 0.5 0 9,383.0 9,383.0 INTRM1, CASING SVRG P Service Top Drrive Service Top Drive hydraulaic pump 2/17/2022 15:30 2/18/2022 00:00 8.5 0 9,383.0 9,383.0 INTRM1, CASING RGRP T Waiting on Hydraulic pump to arrive at rig, remove bad pump, Pump arrived @ 21:30 hrs Install new pump . Adjust hydraulic pressures RIH with single to be able to move string at times during repairwhen safe to do so. s/o 170k circ @ 250 gpm's 499 psi 39 % f/o rotate at 30 rpm's every 30min or when its save to do so during repairs 2/18/2022 00:00 2/18/2022 01:15 1.2 5 9,383.0 9,383.0 INTRM1, CASING RGRP T Cont. t/ adjust TD hydraulic's @ 250 gpm 499 psi 33% f/o Rorate @ 30 rpm every 30 min w/ 8k tq 2/18/2022 01:15 2/18/2022 04:00 2.7 5 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 7629' to md 700 gpm 2919 psi 64% f/o 8k tq, f/ 7629 to 7214' 2/18/2022 04:00 2/18/2022 07:30 3.5 0 9,383.0 9,383.0 INTRM1, CASING CIRC P Pump 20 bbl hi vis sweep circulate out hole 2x racking stand back after each sweep is to surface. 7214' and 7120' 2/18/2022 07:30 2/18/2022 08:00 0.5 0 9,383.0 9,383.0 INTRM1, CASING OWFF P Flowcheck well. Static. 2/18/2022 08:00 2/18/2022 08:30 0.5 0 9,383.0 9,383.0 INTRM1, CASING STRP P Line up MPD and attempt to strip OOH. Observe 42k overpull. 2/18/2022 08:30 2/18/2022 12:00 3.5 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 7120' T/ 6946' w/ 700 gpm, 2685 psi SPP, 64% flow, 100rpm, 8k tq, Maintain 12.5ppge at Qanik. 2/18/2022 12:00 2/18/2022 18:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 6946' T/ 6705' w/ 700 gpm, 2685 psi SPP, 64% flow, 100rpm, 8k tq, Maintain 12.5ppge at Qanik. 2/18/2022 18:00 2/19/2022 00:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 6705' T/ 6463' w/ 700 gpm, 2685 psi SPP, 64% flow, 50-100rpm, 8k tq, Maintain 12.5ppge at Qanik. Note: Continually attempt to increase Block speed. Unable to exceed 100FPH without hole attempting to pack off. 2/19/2022 00:00 2/19/2022 06:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 6463' T/ 6244' w/ 700 gpm, 2685 psi SPP, 64% flow, 50-100rpm, 8k tq, Maintain 12.5ppge at Qanik. Note: At 6380' backream single to 6352'. Ream down and attempt to Pull OOH without pumps or rotation. Observe 10k overpull at 6352'. PUW 188K SOW 155K. 2/19/2022 06:00 2/19/2022 12:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 6244' T/ 5510' w/ 700 gpm, 2500 psi SPP, 66% flow, 100rpm, 6k tq, Maintain 12.5ppge at Qanik. Note: At ~6000' begin staging up block speed from 100 fph to 500fph. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 21/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/19/2022 12:00 2/19/2022 18:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 5510' T/ 4380' w/ 700 gpm, 2350 psi SPP, 66% flow, 100rpm, 5k tq, Maintain 12.5ppge at Qanik. Note: At 4950' dump and dilute 150bbl 11.5ppg WBM. 2/19/2022 18:00 2/20/2022 00:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 4380' T/ 3910' w/ 700 gpm, 2350 psi SPP, 66% flow, 100rpm, 5k tq, Maintain 12.5ppge at Qanik. Note: At 4025' hole attempt to pack off. Reduce block speed to 50 FPH. 2/20/2022 00:00 2/20/2022 06:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 3910' T/ 3348' w/ 700 gpm, 2350 psi SPP, 66% flow, 100rpm, 5k tq, Maintain 12.5ppge at Qanik. 2/20/2022 06:00 2/20/2022 12:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 3348' T/ 3273' w/ 700 gpm, 2192 psi SPP, 66% flow, 100rpm, 3k tq, Maintain 12.5ppge at Qanik. 2/20/2022 12:00 2/20/2022 18:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 3273' T/ 3140' w/ 700 gpm, 2192 psi SPP, 66% flow, 100rpm, 3k tq, Maintain 12.5ppge at Qanik. 2/20/2022 18:00 2/20/2022 20:15 2.2 5 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 3140' T/ 2950' w/ 700 gpm, 2192 psi SPP, 66% flow, 100rpm, 3k tq, Maintain 12.5ppge at Qanik. 2/20/2022 20:15 2/20/2022 22:00 1.7 5 9,383.0 9,383.0 INTRM1, CASING CIRC P At 2950' Well attempting to pack off. SPP increase f/ 2220psi t/ 2415psi. ECD increased from 12.4ppge t/ 13.4ppge. PU stand and work down to 3044'. Wellbore unloaded cuttings and plugged MPD choke. Open by pass line on MPD manifold and continue cirulate hole. clean. ECD decrease to 11.8ppge. 2/20/2022 22:00 2/21/2022 00:00 2.0 0 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 2950' T/ 2407' w/ 700 gpm, 2175 psi SPP, 66% flow, 100rpm, 3k tq, Note: Both MPD chokes 100% open and bypass open. 2/21/2022 00:00 2/21/2022 01:30 1.5 0 9,383.0 9,383.0 INTRM1, CASING CIRC P Pull INTRM BHA into 13 3/8" shoe and pump Hi-Vis nutplug sweep. Work pipe w/ 700gpm, 2140psi SPP, 10 rpm, 3k TQ. Note: Sweep came back 400stks early. Significant increase in baseball sized clay cuttings. Circulate hole clean. 2/21/2022 01:30 2/21/2022 02:00 0.5 0 9,383.0 9,383.0 INTRM1, CASING OWFF P Blow down top drive and flowcheck well. Static. 2/21/2022 02:00 2/21/2022 04:15 2.2 5 9,383.0 9,383.0 INTRM1, CASING RURD P Hold PJSM. Pull RCD bearing and Drip nipple. Install trip nipple. 2/21/2022 04:15 2/21/2022 05:00 0.7 5 9,383.0 9,383.0 INTRM1, CASING TRIP P Trip OOH two stands wet. Pump slug. Trip OOH w/ INTRM BHA f/ 2435' t/ 2040'. Pull 15k over. MU Top Drive. 2/21/2022 05:00 2/21/2022 09:45 4.7 5 9,383.0 9,383.0 INTRM1, CASING BKRM P BROOH F/ 2040' T/ 902' w/ 760 gpm, 2098 psi SPP, 66% flow, 40rpm, 3k tq, Pump nut plug sweep. Observe significant increase in cuttings at surface. 2/21/2022 09:45 2/21/2022 10:00 0.2 5 9,383.0 9,383.0 INTRM1, CASING OWFF P Flow check well. Static. 2/21/2022 10:00 2/21/2022 11:00 1.0 0 9,383.0 9,383.0 INTRM1, CASING OWFF P Pull OOH w/ INTRM BHA f/ 902' t/ 243. Rack back 5" HWDP. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 22/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/21/2022 11:00 2/21/2022 14:15 3.2 5 9,383.0 9,383.0 INTRM1, CASING BHAH P Lay down 9 7/8" X 11" INTRM BHA as per SLB directional. Stabilizers and reamer packed off w/ clay. Bit graded 1-1-WT-A-X-I-NO-TD 2/21/2022 14:15 2/21/2022 15:30 1.2 5 9,383.0 9,383.0 INTRM1, CASING SFTY P Clean and clear rig floor. Wash BOP stack. 2/21/2022 15:30 2/21/2022 16:00 0.5 0 9,383.0 9,383.0 INTRM1, CASING PULL P MU FMC WBT. RIH and retrieve WB as per FMC rep. 2/21/2022 16:00 2/21/2022 16:30 0.5 0 9,383.0 9,383.0 INTRM1, CASING OTHR P Pump out BOP stack and blow down MPD system. 2/21/2022 16:30 2/21/2022 18:00 1.5 0 9,383.0 9,383.0 INTRM1, CASING RURD P Open doors and change out upper rams from 3.5" x 6" VBR's to 7 5/8" solid body csg rams. 2/21/2022 18:00 2/21/2022 19:30 1.5 0 9,383.0 9,383.0 INTRM1, CASING PULD P Install test plug and 7 5/8" test joint as per FMC. RU to test CSG rams, Annular preventer and FOSV. Fill stack and flush lines. 2/21/2022 19:30 2/21/2022 20:00 0.5 0 9,383.0 9,383.0 INTRM1, CASING BOPE P Pressure test Annular Preventer 250/2500 psi, 5/5 min. Test 7 5/8" csg rams & NC50 FOSV 250/4500 psi, 5/5 min. Good test. 2/21/2022 20:00 2/21/2022 20:30 0.5 0 9,383.0 9,383.0 INTRM1, CASING PULD P Rig down and blow down all test equipment. Pull test plug and lay down 7 5/8" test joint. 2/21/2022 20:30 2/21/2022 23:00 2.5 0 9,383.0 9,383.0 INTRM1, CASING RURD P RU Doyon casing crew. CRT, spider, belt tongs, 8' bail extensions, & csg elevators. 2/21/2022 23:00 2/22/2022 00:00 1.0 0 9,383.0 9,383.0 INTRM1, CASING PUTB P Hold detailed PJSM f/ running 7 5/8" 29.7# L80 intermediate string. PU eccentric shoe joint, two intermediate joints and Float collar w/ top hat installed. All joints thread lok'd. 2/22/2022 00:00 2/22/2022 00:45 0.7 5 9,383.0 9,383.0 INTRM1, CASING PUTB P Continue PU 7 5/8" shoe track. MU intermediate XO joint to Float collar. MU Baffle collar. Engage CRT and pump through shoe track. PU string and check floats. 2/22/2022 00:45 2/22/2022 08:30 7.7 5 9,383.0 9,383.0 INTRM1, CASING PUTB P RIH w/ 7 5/8"29.7# L-80 intermediate csg f/ surface to 2432' as per surge calcs. Install centralizers as per tally. 2/22/2022 08:30 2/22/2022 09:30 1.0 0 9,383.0 9,383.0 INTRM1, CASING CIRC P Fill pipe. Circulate BU w/ 8bpm, 155psi SPP, 44% Flow, 2/22/2022 09:30 2/22/2022 18:45 9.2 5 9,383.0 9,383.0 INTRM1, CASING PUTB P RIH w/ 7 5/8"29.7# L-80 intermediate csg f/ 2432' t/ 4675' as per surge calcs. Install centralizers as per tally. 2/22/2022 18:45 2/22/2022 21:15 2.5 0 9,383.0 9,383.0 INTRM1, CASING CIRC P Fill pipe. Gradually stage up flowrate in 1/2 BPM increments and circulate 1.3X BU w/ 3bpm, 120psi SPP, 28% Flow. At BU gradually increase flowrate to 5 BPM. Max MW out 11.6+. 2/22/2022 21:15 2/23/2022 00:00 2.7 5 9,383.0 9,383.0 INTRM1, CASING PUTB P RIH w/ 7 5/8"29.7# L-80 intermediate csg f/ 4675' t/ 5400' as per surge calcs. Install centralizers as per tally. Note: PU stage tool 4675' and threadlok connections. Inspect tool and confirm all shear pins in place. Pinned to shear at 3300psi. 2/23/2022 00:00 2/23/2022 06:15 6.2 5 9,383.0 9,383.0 INTRM1, CASING PUTB P RIH w/ 7 5/8" 29.7# L-80 intermediate csg f/ 5400' t/ 7117' as per surge calcs. Install centralizers as per tally. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 23/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/23/2022 06:15 2/23/2022 10:00 3.7 5 9,383.0 9,383.0 INTRM1, CASING CIRC P Fill pipe. Gradually stage up flowrate in 1/2 BPM increments and circulate 1.5X BU w/ 3bpm, 185psi SPP, 28% Flow. At BU gradually increase flowrate to 6 BPM, 200psi SPP. Max MW out 11.6. 2/23/2022 10:00 2/23/2022 17:45 7.7 5 9,383.0 9,383.0 INTRM1, CASING PUTB P RIH w/ 7 5/8"29.7# L-80 intermediate csg f/ 7117' t/ 9241' as per surge calcs. Install centralizers as per tally. 2/23/2022 17:45 2/23/2022 23:45 6.0 0 9,383.0 9,383.0 INTRM1, CASING OTHR T At 9241' (9 7/8" OH) set down 20 klbs. Attempt to work past obstruction staging up weight to 60 k down. Pick up, string broke free 340 klbs. Establish circulation at 1/2 BPM, 130psi SPP. Work string up to 9225'. Hole attempting to pack off. Stage up flow rate to 3 BPM 290psi SPP and work pipe freely f/ 9211' t/ 9230'. Attempt to wash down past 9230'. Stacking 10-20 klbs and hole pressuring up. Continue work pipe and gradually stage up flowrate to 6 BPM 290psi SPP. Note: No losses while circulating. Max MW at BU 11.7ppg. 2/23/2022 23:45 2/24/2022 00:00 0.2 5 9,383.0 9,383.0 INTRM1, CASING WASH T Wash down 7 5/8" 29.7# L-80 intermediate csg f/ 9230' t/ 9231' w/ 3 BPM, 165psi SPP. Hole continually attempting to pack off. 2/24/2022 00:00 2/24/2022 06:00 6.0 0 9,383.0 9,383.0 INTRM1, CASING WASH T Wash down 7 5/8" 29.7# L-80 intermediate csg f/ 9231' t/ 9267' w/ 3 BPM, 165-250psi SPP. Hole continually attempting to pack off. Vary string speed while working pipe. Work TQ into string (total 1.5 wraps). Note: No downhole losses Shakers clean 2/24/2022 06:00 2/24/2022 14:45 8.7 5 9,383.0 9,383.0 INTRM1, CASING WASH T Wash down 7 5/8" 29.7# L-80 intermediate csg f/ 9267' t/ 9273' w/ 3 BPM, 165-250psi SPP. Hole continually attempting to pack off. Vary string speed while working pipe. Work TQ into string 10k TQ into string. Note: No downhole losses Shakers clean 2/24/2022 14:45 2/24/2022 16:15 1.5 0 9,383.0 9,383.0 INTRM1, CASING OTHR T Unable to work past 9,273'. Pump OOH t/ 9211' W/ 3BPM, 151psi SPP. (lay down two jnts). MU 10' and 5' pup jnts and RIH t/ 9,226'. PU and MU hanger. 2/24/2022 16:15 2/24/2022 16:45 0.5 0 9,383.0 9,383.0 INTRM1, CASING WASH P Wash down 7 5/8" 29.7# L-80 intermediate csg f/ 9267' t/ 9273' w/ 3 BPM, 205psi SPP. Land hanger. SOW 225k. Shoe depth 9268' MD (104' shallower than planned). 2/24/2022 16:45 2/24/2022 17:30 0.7 5 9,383.0 9,383.0 INTRM1, CEMENT CIRC P Circulate w/ 3BPM, 225psi SPP, Rig down csg elevators and bail extensions. 2/24/2022 17:30 2/24/2022 18:00 0.5 0 9,383.0 9,383.0 INTRM1, CEMENT RURD P Blow down Top Drive and and rig up cement hose to CRT swivel. Concurrently hold PJSM for cmt job w/ on coming crews. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 24/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/24/2022 18:00 2/24/2022 19:00 1.0 0 9,383.0 9,383.0 INTRM1, CEMENT CIRC P Break circulation through cmt hose and stage up flow rate f/ 1 BPM, 155psi SPP t/ 7BPM, 490psi. Concurrently continue RU SLB cementers. 2/24/2022 19:00 2/24/2022 22:30 3.5 0 9,383.0 9,383.0 INTRM1, CEMENT CMNT P Flush and press test cmt line to 3500psi 5 min. Good test. Bleed off press and line up to MP's. Pump 50bbl 8.33ppg surfactant pill 4 bpm, 350psi SPP. Shut down and line up cementers. Mix and pump 50bbl 12.2ppg MUDPUSHII spacer @ 4.5BPM, 355psi. Drop btm plug witnessed by COP DSV and HES. Mix and pump 223 bbl G Lead cmt, (663 sx) 13.0ppg 1.89 yield at 5.5 BPM, 180 psi. Slow rate to 3 BPM 10bbl before btm plug at stage tool. Begin batch lead @19:48. Mix and pump 45 bbl G Tail cmt, (218 sx) 15.8ppg 1.16 yield at 4.5 BPM, 130 psi. Begin batch tail @ 20:48. Drop top plug witnessed by COP DSV and HES. Displace 20bbl FW w/ cement unit. Swap to rig pumps and displace cmt w/ 3890 stks (392 bbl) 11.5ppg LSND WBM at 7-4 BPM, 30-430psi. Slow rate to 3BPM at 380bbl displaced. Total displacement 20bbl + 392bbl = 412bbl Bump plug 116 stks (11.5bbl) early. Bump @ 22:34. FCP: 430psi Lift press: 375psi Hold 920psi 5min. Bleed off press. Floats held. 2/24/2022 22:30 2/24/2022 23:00 0.5 0 9,383.0 9,383.0 INTRM1, CEMENT OTHR P Line up MP's. Press up CSG in LOT mode. Shear open stage tool w/ 3320psi. 4.8bbl pumped. 2/24/2022 23:00 2/25/2022 00:00 1.0 0 9,383.0 9,383.0 INTRM1, CEMENT CIRC P Stage up flow rate and circulate BU through stage tool @ 4501' w/ 4BPM, 130psi. 2/25/2022 00:00 2/25/2022 01:00 1.0 0 9,383.0 9,383.0 INTRM1, CEMENT CIRC P Continue circulate BU through stage tool @ 4501' w/ 4BPM, 130psi. Note: No surfactant, spacer, or cement observed at BU. 2/25/2022 01:00 2/25/2022 04:30 3.5 0 9,383.0 9,383.0 INTRM1, CEMENT WOC P Wait on tail cement to reach 100psi compressive strength. Concurrently circulate through stage tool at 1/2BPM, 50psi SPP. 2/25/2022 04:30 2/25/2022 10:00 5.5 0 9,383.0 9,383.0 INTRM1, CEMENT CIRC P Increase flowrate t/ 4BPM and begin dropping MW from 11.5ppg to 11.0ppg LSND in preperation for 2nd stage cmt job. 2/25/2022 10:00 2/25/2022 10:30 0.5 0 9,383.0 9,383.0 INTRM1, CEMENT OTHR P Blow down top drive and line up cementers. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 25/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/25/2022 10:30 2/25/2022 12:00 1.5 0 9,383.0 9,383.0 INTRM1, CEMENT CMNT P Flush lines. Mix and pump 40bbl 11.5ppg MUDPUSHII spacer @ 4.5BPM, 315psi. Mix and pump 71 bbl G Tail cmt, (344 sx) 15.8ppg 1.16 yield at 4 BPM, 410 psi. Begin batch tail @ 10:36. Drop top plug witnessed by COP DSV and HES. Displace 20bbl FW w/ cement unit. Swap to rig pumps and displace cmt w/ 1829 stks (184 bbl) 11.0ppg LSND WBM at 6-3 BPM, 140-380psi. Slow rate to 3BPM at 169bbl displaced. Total displacement 20bbl + 184bbl = 204bbl Bump plug 41 stks (4bbl) early. Bump @ 11:54. FCP: 281psi Lift press: 243psi Hold 2000psi 5min & close stage tool Apply 2000psi & hold 5min. Bleed off press. Floats held. 2/25/2022 12:00 2/25/2022 12:45 0.7 5 9,383.0 9,383.0 INTRM1, WHDBOP OWFF P Flowcheck well. Static. 2/25/2022 12:45 2/25/2022 13:45 1.0 0 9,383.0 9,383.0 INTRM1, WHDBOP RURD P Blow down and rig down cement line. Rig down CRT and cementers. Clean and clear rig floor. 2/25/2022 13:45 2/25/2022 14:30 0.7 5 9,383.0 9,383.0 INTRM1, WHDBOP PULD P Lay out landing joint. RU packoff running tool. Continue clean and clear rig floor. 2/25/2022 14:30 2/25/2022 16:00 1.5 0 9,383.0 9,383.0 INTRM1, WHDBOP PRTS P Drain BOP stack, set 7-5/8" packoff per FMC. Test packoff to 5000 psi for 10 min. Witnessed by CPAI DSV. 2/25/2022 16:00 2/25/2022 19:30 3.5 0 9,383.0 9,383.0 INTRM1, WHDBOP OTHR P Change the top drive saver sub to XT-39 and change out bell guide. Concurrently change out upper rams to 3 1/2" x 6" VBR's. 2/25/2022 19:30 2/26/2022 00:00 4.5 0 9,383.0 9,383.0 INTRM1, WHDBOP PULD P Hold PJSM. Install mouse house in rotary. Lay down 5" HWDP and 5" DP. Note: Phase III weather conditions called @19:16. 2/26/2022 00:00 2/26/2022 12:00 12. 00 9,383.0 9,383.0 INTRM1, WHDBOP PULD P Hold PJSM with oncoming crew. Lay down 5" DP. (46 of 100 stands layed down). Several tight connections. Steam connections and break out with rig tongs as required. 2/26/2022 12:00 2/27/2022 00:00 12. 00 9,383.0 9,383.0 INTRM1, WHDBOP PULD P Continue lay down 5" DP. (86 of 100 stands layed down). Several tight connections. Steam connections and break out with rig tongs as required. Concurrently haul off excess LSND WBM from pits. Change out #2 shaker screens to 140's. 2/27/2022 00:00 2/27/2022 03:30 3.5 0 9,383.0 9,383.0 INTRM1, WHDBOP PULD P Lay down remaining 14jnts of 5" DP (100 total stands 5" DP). Several tight connections. Steam connections and break out with rig tongs as required. Concurrently rig up manifold to B Annulus in preparation for injectivity test. Pull mousehole and lay out same. 2/27/2022 03:30 2/27/2022 04:00 0.5 0 9,383.0 9,383.0 INTRM1, WHDBOP RURD P RD and lay out 5" handling equipment and well control valves. Lay out mouse hole and change out ST-100 dies to 4". Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 26/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/27/2022 04:00 2/27/2022 05:30 1.5 0 9,383.0 9,383.0 INTRM1, WHDBOP BOPE P PU 4" test joint. MU test plug, measure in hole and land out same as per FMC service tech. Flood BOP stack and flush lines. Shell test BOP. 2/27/2022 05:30 2/27/2022 11:00 5.5 0 9,383.0 9,383.0 INTRM1, WHDBOP BOPE P Test BOPE all tests 250/4,500psi 5/5min. Test Annular Preventer 250/2500psi, 5/5min. Manual and super chokes tested to 2,000psi. Test Annular Preventer and 3 1/2" x 6" UPR and LPR with 4" and 5 1/2" test joint. Test choke valves 1-15, manual and super choke, choke and kill manual's and HCR's, 4" valve on kill line, 2 x 4" FOSV, 4" dart valve, upper and lower IBOP, blind/shear rams. Perform Koomey drawdown, ACC=3025 psi, manifold=1475psi initial. After all functions, accumulator=1725 psi, 7 secs to 200 psi with two electric pumps, 58 secs to build to full system pressure with two electric and two air pumps. 6 Nitrogen bottles back-up avg=2003psi. CPAI witnessed. Test PVT, gain/loss, flow out, LEL and H2S alarms. AOGCC Rep Robert C Noble waived witness BOPE test 02/22/2022 @ 18:12. 2/27/2022 11:00 2/27/2022 11:30 0.5 0 9,383.0 9,383.0 INTRM1, WHDBOP OTHR P Pull test plug and install wearbushing (ID=8.75") as per FMC service tech. 2/27/2022 11:30 2/27/2022 12:30 1.0 0 9,383.0 9,383.0 INTRM1, WHDBOP OTHR P Blow down and rig down all BOP test equipment. 2/27/2022 12:30 2/27/2022 14:00 1.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT PULD P Clean and clear rig floor. Prep rig floor and pipe shed for PU 4" DP and BHA. 2/27/2022 14:00 2/27/2022 15:00 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT PULD P Single in 15jnts of 4" DP. POOH and rack back 5 stands. 2/27/2022 15:00 2/27/2022 16:00 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT BHAH P MU and RIH w/ 6 3/4" clean out BHA F/ surface T/ 595'. 6 3/4" mill tool Bit sub 6 5/8" Stabilizer w/ float 4 3/4" NMDC XO (NC38 P, XT39 B) 15 jnts 4" HWDP 4 3/4" jars 2 jnts 4" HWDP 2/27/2022 16:00 2/28/2022 00:00 8.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT TRIP P Single in hole 6 3/4" clean out BHA on 4" DP F/ 595' T/ 4373'. Avg 24 jnts/hr. Concurrently perform B annulus annular injection test w/ rig pump. Inject 300bbl FW. LOP 750psi w/ 11.0ppg WBM. 17.2ppg EMW. 2/28/2022 00:00 2/28/2022 02:30 2.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT COCF P MU topdrive and fill pipe. Wash down F/ 4,373 ft T/ 4,434 ft w/ 165gpm, 550psi SPP. Establish rotation and clean out cement F/ 4,434 ft T/ 4,502 ft. Drill out stage tool F/ 4,502 ft T/ 4,505 ft w/ 8-20k WOB, 165gpm, 550psi SPP, 50rpm, 2-3k TQ. Make 3 rotating passes through stage tool. 2/28/2022 02:30 2/28/2022 03:30 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT WASH P Continue wash/ream down F/4,505 ft T/ 4,780 ft w/ 0-12k WOB, 300gpm, 1230psi SPP, 50rpm, 2-3k TQ. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 27/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 2/28/2022 03:30 2/28/2022 09:00 5.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT TRIP P Blow down top drive. Single in hole 6 3/4" clean out BHA on 4" DP F/ 4,780 ft T/ 6,874 ft. Avg 24 jnts/hr. 2/28/2022 09:00 2/28/2022 11:00 2.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT COCF P Set down weight at 8,968 ft. Make up top drive and wash down T/ 9,126 ft. Clean out cement T/ 9,126 ft W/ 300gpm, 2,070psi SPP, 50 RPM, 6-7k TQ. 2/28/2022 11:00 2/28/2022 12:30 1.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT CIRC P Circulate bottoms up and condition mud W/ 350gpm, 2,370psi SPP, 40 rpm, 5-6k TQ. Concurrently perform B annulus annular injection test #2 w/ rig pump. Inject 43bbl FW. LOP 390psi w/ 8.35ppg FW. 11.6ppg EMW. Freeze protect annulus with 170bbl diesel. 2/28/2022 12:30 2/28/2022 13:30 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT TRIP P Pull OOH 5 stand wet T/ 8,534 ft. Pump 20bbl 11.9ppg slug and blow down top drive. 2/28/2022 13:30 2/28/2022 18:30 5.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT TRIP P Pull OOH F/ 8,534 ft T/ 4,276 ft. Pipe start pulling wet. Pump 20bbl 12.9ppg slug. Continue Pull OOH to 684 ft. 2/28/2022 18:30 2/28/2022 20:00 1.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT BHAH P Flowcheck well static. Rack back 4" HWDP and lay down clean out BHA. 2/28/2022 20:00 2/28/2022 21:15 1.2 5 9,383.0 9,383.0 INTRM1, DRILLOUT PULD P Hold PJSM. RU SLB wireline and PU tool string. 2/28/2022 21:15 2/28/2022 22:00 0.7 5 9,383.0 9,383.0 INTRM1, DRILLOUT ELOG T RIH W/ USIT tool T/ 2,000 ft WLMD. Attempt function test tools. USIT unable to turn. POOH w/ wireline. Remove bell sub from USIT. Function test USIT at surface. 2/28/2022 22:00 2/28/2022 23:30 1.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT ELOG P RIH W/ USIT tool T/ 9,124 ft WLMD logging down at 5,000 fph. 2/28/2022 23:30 3/1/2022 00:00 0.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT ELOG P Log up w/ USIT tool F/ 9,124 ft WLMD at 1,800 fph to 6,675 ft WLMD. 3/1/2022 00:00 3/1/2022 05:15 5.2 5 9,383.0 9,383.0 INTRM1, DRILLOUT ELOG P Log up w/ USIT tool F/ 6,675 ft WLMD at 1,800fph to surface. Verify USIT log prior to breaking down tools. 3/1/2022 05:15 3/1/2022 06:00 0.7 5 9,383.0 9,383.0 INTRM1, DRILLOUT RURD P Hold PJSM. Rig down SLB wireline. Clean and clear rig floor. 3/1/2022 06:00 3/1/2022 07:00 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT BHAH P PU BHA tools and equipment to the rig floor. 3/1/2022 07:00 3/1/2022 07:30 0.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT SVRG P Service Top Drive, Blocks, ST-100, and Pipe Skate. 3/1/2022 07:30 3/1/2022 09:30 2.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT SLPC P Slip and cut 10 wraps (147') Drill Line. Recalibrate blocks. 3/1/2022 09:30 3/1/2022 11:30 2.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT PRTS P Rig up for casing test. Close Blind rams and flush lines. Pressure test 7 5/8" casging in LOT mode to 4210psi for 30 minutes. 5.8BBL pumped and returned. Note: EPA remote witness test 3/1/2022 11:30 3/1/2022 12:00 0.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT OTHR P Rig down and blow down all test lines and equipment. 3/1/2022 12:00 3/1/2022 12:30 0.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT PRTS P RU and pressure test MPD line 1,000psi. Good test. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 28/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/1/2022 12:30 3/1/2022 16:00 3.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT BHAH P Hold PJSM. PU 6 3/4" production BHA as per SLB DD F/ surface T/ 727 ft. 20 klbs below jars. 6 3/4" PDC Bit [X516] PD 475 Orbit 6 5/8" Slick CC PowerDrive Receiver Sub w/ stabilizer 4 3/4" ImPulse VPWD Internal/External psi Pressure While Drlg SonicScope 475 w/ 6 1/2" Stabilizer ADN-4 w/ 5 7/8" Stabilizer 6 5/8" NM Stabilizer (Non-ported Plunger float) Mudgard 475 (Filter sub) 4 3/4 Slick NMDC (3 1/2 IF Corrosion Ring) Float Sub (Non-ported Plunger float) Float Sub (Non-ported GS Float) XO 4" HWDP (15 joints) 4 3/4" Jars 4" HWDP (2 joints) 3/1/2022 16:00 3/1/2022 18:30 2.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT TRIP P Single in hole w/ 6 3/4" production BHA F/ 727 ft T/ 1,294 ft. 3/1/2022 18:30 3/2/2022 00:00 5.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT TRIP P TIH w/ 6 3/4" production BHA F/ 1,294 ft T/ 8,953 ft. Fill pipe every 20' 3/2/2022 00:00 3/2/2022 00:30 0.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT OTHR T Lost MD Totco displays. Reboot computers. Concurrently monitor well on TT. 3/2/2022 00:30 3/2/2022 05:15 4.7 5 9,383.0 9,383.0 INTRM1, DRILLOUT COCF P Wash down F/ 8,953 ft T/ 9,126 ft. Clean shoe track F/ 9,126 ft T/ 9,260 ft w/ 210gpm, 1560psi SPP, 3-8k WOB, 40-80 RPM, 9k TQ. Drill out Baffle collar at 9,143 ft. Cement firm up at 9,152 ft. Drill out Float collar at 9,181 ft. 3/2/2022 05:15 3/2/2022 06:30 1.2 5 9,383.0 9,383.0 INTRM1, DRILLOUT CIRC P Circulate BU work pipe w/ 270gpm, 2110psi SPP, 40 rpm, 8-9k TQ. 3/2/2022 06:30 3/2/2022 07:00 0.5 0 9,383.0 9,383.0 INTRM1, DRILLOUT MPDA P Blow down Top Drive and drain stack. Prep for RCD bearing install. 3/2/2022 07:00 3/2/2022 08:00 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT MPDA P Release clamp and pull trip nipple. Install drain nipple and RCD bearing as per Beyond service Tech. 3/2/2022 08:00 3/2/2022 09:00 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT MPDA P Perform MPD familiarization w/ Drillier and MPD choke operator. Add axillary pump to MPD equipment and adjust flowrate for optimal choke adjustment. 3/2/2022 09:00 3/2/2022 10:15 1.2 5 9,383.0 9,383.0 INTRM1, DRILLOUT COCF P Clean out shoe track and float shoe F/ 9,260 ft T/ 9,267 ft w/ 240 - 260gpm, 1,900 - 2,150psi SPP, 2k WOB, 40-70 RPM, 6 - 10k TQ. 3/2/2022 10:15 3/2/2022 14:00 3.7 5 9,383.0 9,383.0 INTRM1, DRILLOUT COCF P Clean out rathole F/ 9,267 ft T/ 9,310 ft. w/ 240 - 260gpm, 1,900 - 2,150psi SPP, 2k WOB, 40-70 RPM, 6 - 10k TQ, 200psi SBP. Maintain 11.0ppge @ 7 5/8" shoe. 3/2/2022 14:00 3/2/2022 15:00 1.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT MPDA T Observe RCD bearing leaking. Bleed off MPD pressure and ream back to shoe. Hold PJSM and change bearing. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 29/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/2/2022 15:00 3/2/2022 19:00 4.0 0 9,383.0 9,383.0 INTRM1, DRILLOUT COCF P Continue clean out rathole F/ 9,310 ft T/ 9,383 ft. w/ 260gpm, 2,150psi SPP, 2-5k WOB, 70 RPM, 6 - 10k TQ, 200psi SBP. Maintain 11.0ppge @ 7 5/8" shoe. Hole attempting to pack off. Significant shale cuttings at surface. 3/2/2022 19:00 3/2/2022 19:45 0.7 5 9,383.0 9,403.0 INTRM1, DRILLOUT DDRL P Drill 6 3/4" production hole F/ 9,383 ft T/ 9,403'. WOB: 10K Flow: 260gpm SPP: 2205psi SBP: 200psi ECD: 11.1 MW: 10+ Rotary: 80rpm TQ: 8-9K Flow: 45% PUW: 189k SOW: 139k RT WT: 161k 3/2/2022 19:45 3/2/2022 21:30 1.7 5 9,403.0 9,403.0 INTRM1, DRILLOUT CIRC P Pump Hi-Vis sweep and circulate hole clean W/ 260gpm, 2220psi SPP, 50rpm, 8k TQ. Hole attempting to pack off. Back ream OOH 2 stands T/ 9236'. 3/2/2022 21:30 3/2/2022 22:45 1.2 5 9,403.0 9,403.0 INTRM1, DRILLOUT FIT P Blow down Top Drive. Rig up pump in sub and flush string and kill line. Close UPR. Perrform FIT 7-5/8" intermediate casing shoe to 13.5 ppg EMW with 10.0ppg mud. Apply 1,564psi down string and kill line. 2bbl pumped/returned. Rig down testing equipment. MWD pump up ESD 13.4ppge. 3/2/2022 22:45 3/2/2022 23:30 0.7 5 9,403.0 9,403.0 PROD1, DRILL REAM P Wash down F/ 9,236 ft T/ 9,390 ft. W/ 300gpm, 2,615psi SPP, 0-5k WOB, 40 RPM, 6 - 7k TQ, 200psi SBP. Maintain 11.0ppge @ 7 5/8" shoe. 3/2/2022 23:30 3/3/2022 00:00 0.5 0 9,403.0 9,403.0 PROD1, DRILL REAM P At 9,390 ft hole attempt to pack off W/ 230psi press spike. PU off bottom and decrease flowrate to 85gpm. No increase in TQ observed. Stage up pumps and continue attempt to wash down past 9,390 ft W/ 300gpm, 2,615psi SPP, 0-5k WOB, 80 RPM, 6 - 7k TQ, 200psi SBP. Maintain 11.0ppge @ 7 5/8" shoe. 3/3/2022 00:00 3/3/2022 02:45 2.7 5 9,403.0 9,403.0 PROD1, DRILL REAM P Washdown F/ 9,390 ft T/ 9,403 ft w/ 300gpm, 2,615psi SPP, 0-5k WOB, 80 RPM, 6 - 7k TQ, 200psi SBP. Maintain 11.0ppge @ 7 5/8" shoe. Pump Hi-Vis sweep. No increase in cuttings. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 30/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/3/2022 02:45 3/3/2022 06:00 3.2 5 9,403.0 9,650.0 PROD1, DRILL DDRL P Drill 6 3/4" production hole F/ 9,403 ft T/ 9,650 ft. WOB: 10-22K ROP: 70.6 fph Flow: 292 gpm SPP: 2580 psi SBP: 205 psi ECD: 11.11 ppge MW: 10.0+ ppg FV: 44 Rotary: 100-140 rpm TQ: 8-9K Flow: 54% Note: Pump 40bbl HI-Vis sweep each stand. 3/3/2022 06:00 3/3/2022 12:00 6.0 0 9,650.0 9,993.0 PROD1, DRILL DDRL P Drill 6 3/4" production hole F/ 9,650 ft T/ 9,993 ft. WOB: 18K ROP: 57.2 fph Flow: 296 gpm SPP: 2705 psi SBP: 135 psi ECD: 11.08 ppge MW: 10.0 ppg FV: 42 Rotary: 60-120 rpm TQ: 11-12K Flow: 54% 3/3/2022 12:00 3/3/2022 18:00 6.0 0 9,993.0 10,255.0 PROD1, DRILL DDRL P Drill 6 3/4" production hole F/ 9,993 ft T/ 10,255 ft. WOB: 18K ROP: 43.7 fph Flow: 296 gpm SPP: 2720 psi SBP: 158 psi ECD: 11.09 ppge MW: 10.0+ ppg FV: 39 Rotary: 65-100 rpm TQ: 11-12K Flow: 54% 3/3/2022 18:00 3/4/2022 00:00 6.0 0 10,255.0 10,585.0 PROD1, DRILL DDRL P Drill 6 3/4" production hole F/ 10,255 ft T/ 10,585 ft. WOB: 18K ROP: 55 fph Flow: 296 gpm SPP: 2771 psi SBP: 178 psi ECD: 11.06 ppge MW: 10.0 ppg FV: 40 Rotary: 70 rpm TQ: 11-12K Flow: 54% Bit Hrs: 25.25 Jar Hrs: 26.17 Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 31/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/4/2022 00:00 3/4/2022 01:00 1.0 0 10,585.0 10,636.0 PROD1, DRILL DDRL P Drill 6 3/4" production hole F/ 10,585 ft T/ 10,636 ft. WOB: 18K ROP: 51 fph Flow: 296 gpm SPP: 2756 psi SBP: 190 psi ECD: 11.04 ppge MW: 9.9+ ppg FV: 40 Rotary: 60 rpm TQ: 11-12K Flow: 54% 3/4/2022 01:00 3/4/2022 02:30 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC P Pump Hi-Vis sweep and circulate hole clean. Work pipe w/ 296gpm, 2825psi SPP, 40rpm, 9k TQ. No increase in cuttings w/ sweep at surface. Obtain TD survey and downlink sonic tool to fast configuration. 3/4/2022 02:30 3/4/2022 07:30 5.0 0 10,636.0 10,636.0 PROD1, CASING BKRM P BROOH F/ 10,636 ft T/ 9,239 ft ( inside 7 5/8" csg shoe) w/ 296 gpm, 2775 psi SPP, 51% flow, 50rpm, 8-10k tq, Maintain 11.0 ppge at 7 5/8" shoe. 3/4/2022 07:30 3/4/2022 08:30 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC P Circulate BU w/ 296gpm, 2685psi SPP, 20rpm, 7k TQ. 3/4/2022 08:30 3/4/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC T Continue circulate while evaluating path forward due to CD1 gas release. 3/4/2022 09:00 3/4/2022 10:15 1.2 5 10,636.0 10,636.0 PROD1, CASING OTHR T Decision made to suspend operations. Demobilize all trucks to 5 acre pad. Blow down top drive and all circulating equipment. Shut off Tioga air heaters. Shut down boilers and drain lines. Install FOSV. Close UPR and Annular Preventer (trap 480psi on well). Bleed off MPD pressure. MU Top Drive and close IBOP and manual valve. Close C & K manual vales. Continue drain and blow down all lines in preparation. 3/4/2022 10:15 3/4/2022 10:45 0.5 0 10,636.0 10,636.0 PROD1, CASING SISW T Decision made to evacuate rig due to CD1 gas release. Muster all personnel and obtain accurate head count. Evacuate all non essential personnel. Electrician power down rig. Conduct final head count and evacuate all remaining personnel to DC1 camp. 3/4/2022 10:45 3/4/2022 20:00 9.2 5 10,636.0 10,636.0 PROD1, CASING OTHR T Waiting orders. 3/4/2022 20:00 3/4/2022 23:00 3.0 0 10,636.0 10,636.0 PROD1, CASING OTHR T Mobilize EMS, Tour Pusher, and EMS to rig. Inspect rig with gas detectors and perform investigation. Decision made to send out essential personnel and start up rig. 3/4/2022 23:00 3/5/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Hold detailed PJSM. Mobilize essential personnel to rig. Electrician and motorman power up rig at 23:30. (Notify ALP security prior to powering up rig and provide headcount). Fire up boilers. Open cellar and ventilate w/ Tioga.Inspect water lines throughout rig. 3/5/2022 00:00 3/5/2022 03:00 3.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Continue get steam back online and rig warm. Check all centrifugal pump drains. Continue inspect water lines. Offload Baker 47D2 TST-3 Storm Packer and 47 storm valve with XO's. Casing pressure 25psi. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 32/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/5/2022 03:00 3/5/2022 04:15 1.2 5 10,636.0 10,636.0 PROD1, CASING OTHR T Blow down Top Drive and mud line back to mud pumps. Blow down mud pumps through MPD system. Trouble shoot drawworks choppers. Recalibrate block height. Open choke and kill manual valves. 3/5/2022 04:15 3/5/2022 05:00 0.7 5 10,636.0 10,636.0 PROD1, CASING OWFF T Clean rig floor and open Annular Preventer. Break circulation with auxillary pump and circulate through MPD system with fully open chokes. Open UPR's (no increase in MPD pressure observed). Gradually increase MPD SBP in 50psi increments to 200psi. 3/5/2022 05:00 3/5/2022 12:00 7.0 0 10,636.0 10,636.0 PROD1, CASING CIRC T PU and ensure string free. Rotate string 10rpm to break gels. Stage up flow rate in 1/2 BPM increments over 5 min period to 300gpm 2,375 psi SPP. No losses observed. 3/5/2022 12:00 3/5/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING STRP T SIH w/ 6 3/4" production BHA f/ 9,144 ft t/ 9,363 ft. Hold 11.0ppge at 7 5/8" shoe w/ MPD. 3/5/2022 12:30 3/5/2022 16:30 4.0 0 10,636.0 10,636.0 PROD1, CASING REAM T At 9,363 ft set down 30k unable to work through. MU Top Drive and ream down t/ 9,521 ft w/ 300 gpm, 2700 psi SPP, 60 rpm, 8k TQ. Hold 11.0ppge at 7 5/8" shoe w/ MPD. 3/5/2022 16:30 3/5/2022 17:30 1.0 0 10,636.0 10,636.0 PROD1, CASING STRP T SIH w/ 6 3/4" production BHA f/ 9,521 ft t/ 9,363 ft. Hold 11.0ppge at 7 5/8" shoe w/ MPD. 3/5/2022 17:30 3/5/2022 18:30 1.0 0 10,636.0 10,636.0 PROD1, CASING REAM T MU Top Drive and ream down f/ 9,363 ft t/ 10,636' w/ 296gpm, 2,832 psi SPP, 80 rpm, 10k TQ, Start taking weight at 10,599 ft. Clean out fill w/ 0-5k WOB. 3/5/2022 18:30 3/5/2022 21:00 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC T Circulate 3X BU w/ 296gpm, 2850psi SPP, 40rpm, 9k TQ. Rack back stand after first BU. 3/5/2022 21:00 3/6/2022 00:00 3.0 0 10,636.0 10,636.0 PROD1, CASING BKRM T BROOH F/ 10,636 ft T/ 9,800 ft w/ 296 gpm, 2,860 psi SPP, 51% flow, 60rpm, 9- 10k tq, Maintain 11.0 ppge at 7 5/8" shoe. Moderate amount of cuttings across shakers w/ occasional TQ spikes. 3/6/2022 00:00 3/6/2022 02:15 2.2 5 10,636.0 10,636.0 PROD1, CASING REAM T BROOH F/ 9,800 ft T/ 9,239 ft (inside 7 5/8" csg shoe) w/ 296 gpm, 2,860 psi SPP, 51% flow, 60rpm, 9-10k tq, Maintain 11.0 ppge at 7 5/8" shoe. Slow pulling speed to 400 fph throuh 9 7/8" rat hole. No drag or TQ spikes observed. 3/6/2022 02:15 3/6/2022 03:45 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC T Circulate 2 BU w/ 300gpm, 2,780psi SPP, 30 rpm, 7k TQ. Well unloading fine to medium shale cuttings. 3/6/2022 03:45 3/6/2022 04:15 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR P Drop 2.11" drift w/ 100' tail. Blow down Top Drive. 3/6/2022 04:15 3/6/2022 08:00 3.7 5 10,636.0 10,636.0 PROD1, CASING STRP P SOOH W/ 6 3/4" production BHA F/ 9,239 ft T/ 5,745 ft. Maintain 11.0 ppge at 7 5/8" shoe. 3/6/2022 08:00 3/6/2022 08:30 0.5 0 10,636.0 10,636.0 PROD1, CASING SVRG P Rig service. Service ST-100. 3/6/2022 08:30 3/6/2022 10:00 1.5 0 10,636.0 10,636.0 PROD1, CASING RGRP T Repair ST-100 clamp and replace on/off switch and unclamp switch. Reboot Java virtual manager per NOV tech. 3/6/2022 10:00 3/6/2022 12:30 2.5 0 10,636.0 10,636.0 PROD1, CASING STRP P Continue SOOH W/ 6 3/4" production BHA F/ 5,745 ft T/ 2,808 ft. Maintain 11.0 ppge at 7 5/8" shoe. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 33/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/6/2022 12:30 3/6/2022 13:45 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC P Spot 27.5bbl 12.4ppg Hi-Vis gel pill, chase pill with 13.5ppg mud cap. 290gpm, 2685psi SPP. Blow down top drive. 3/6/2022 13:45 3/6/2022 14:45 1.0 0 10,636.0 10,636.0 PROD1, CASING STRP P Continue SOOH W/ 6 3/4" production BHA F/ 2,808' T/ 2,243 ft. Maintain 11.0 ppge at 7 5/8" shoe. 3/6/2022 14:45 3/6/2022 15:30 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC P Pump 115bbl 13.5ppg mud cap 290gpm, 2709psi SPP. Blow down top drive. Maintain 11.0ppge at 7 5/8" shoe. 3/6/2022 15:30 3/6/2022 19:00 3.5 0 10,636.0 10,636.0 PROD1, CASING COND P Build 13.5ppg mud cap in pits. 3/6/2022 19:00 3/6/2022 20:30 1.5 0 10,636.0 10,636.0 PROD1, CASING STRP P Continue SOOH W/ 6 3/4" production BHA F/ 2,243' T/ 817 ft. Maintain 11.0 ppge at 7 5/8" shoe. 3/6/2022 20:30 3/6/2022 21:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF P Flowcheck well. Static. 3/6/2022 21:00 3/6/2022 22:30 1.5 0 10,636.0 10,636.0 PROD1, CASING MPDA P Hold PJSM. Unlatch and pull RCD bearing. Rack back on last stand of 4" DP. Pull drip nipple and install trip nipple. 3/6/2022 22:30 3/6/2022 23:30 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP P Lay down 2 jnts 4" HWDP and drilling jars. TOOH w/ 6 3/4" production BHA f/ 817 ft to 176 ft. Rack back 5 stands 4" HWDP w/ 3 1/2 IF XO on last stand. Note: 2.11" steel drift recovered from top of upper float sub. All 4" HWDP drifted and 90 stands 4" DP. 3/6/2022 23:30 3/7/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH P Hold PJSM. Lay down 6 3/4" production BHA F/ 176 ft T/ 126 ft. 3/7/2022 00:00 3/7/2022 02:00 2.0 0 10,636.0 10,636.0 PROD1, CASING BHAH P Remove source from ADN tool. Continue lay down 6 3/4" production BHA F/ 126 ft to surface. Utilize tongs on BHA components due to ST-100 inoperability. Bit graded: 2-3-BT-A-X-I-PN-TD 3/7/2022 02:00 3/7/2022 03:45 1.7 5 10,636.0 10,636.0 PROD1, CASING RURD P Clean and clear rig floor of BHA. RU csg equipment. 3/7/2022 03:45 3/7/2022 05:00 1.2 5 10,636.0 10,636.0 PROD1, CASING RUNL P Hold PJSM. MU 5 1/2" 15.5# L-80 HYD 511 shoe track and RIH F/ surface T/ 172 ft. MU Top Drive and pump through shoe track. Check floats. Blow down Top Drive. 3/7/2022 05:00 3/7/2022 09:00 4.0 0 10,636.0 10,636.0 PROD1, CASING RUNL P Continue RIH w/ 5 1/2" 15.5# L-80 HYD 511 production liner F/ 172 ft T/ 1524 ft. Fill pipe with 10.0 ppg WBM via fill up hose. 36 jts in the hole. 3/7/2022 09:00 3/7/2022 10:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RUNL P M/U liner ZXP hanger packer assembly and 1 stand HWDP. F / 1524' to 1670' (fill liner with Pal mix) 3/7/2022 10:00 3/7/2022 11:00 1.0 0 10,636.0 10,636.0 PROD1, CASING MPDA P Pull trip nipple and prep to install bearing. Decision made to secure the well due to changing conditions of the CD1 gas release. Re-install trip nipple. 3/7/2022 11:00 3/7/2022 11:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR T RIH 1 stand of 4" DP to 1765'. Install TIW valve and head pin. Shut in upper pipe rams and annular and close choke/kill manuals. Well secure 11:20 Hrs 3/7/2022 11:30 3/7/2022 12:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR T Blow down surface lines. Drain hot well. Reduce boiler presure to 50 psi. Kill power to rig and evauate from rig. 3/7/2022 12:00 3/8/2022 00:00 12. 00 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. Discuss plan forawrd options. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 34/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/8/2022 00:00 3/9/2022 00:00 24. 00 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. Discuss plan forawrd options. Note: At 01:30 Drilling Supervisor, ToolPusher and Infrastructure SUP attempt to drain stack via upper casing valve. Wing frozen on Wellhead. Pad operators RU flameless heater and attempt to thaw wellhead. At 03:00 open IA and drain ~1bbl WBM from stack into cellar. At 15:00 Doyon Drilling Superintendent, Tool Pusher, and driller enter rig and drain boilers and water tank. Concurrently COP production rigged up hardline from WD-03 OA back to CD1-48 tree cap to allow for flow back to production. At 19:00 started OA flow back. Initially received 15 BBLS fluid, then all gas @ approximately 2000 MSCF/day – OA PSI slowly dropping F/775 PSI T/ ~400 PSI at midnight. 3/9/2022 00:00 3/9/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 00:00 shut in choke. Pressure increase F/ ~350 PSI T/ ~380 PSI in minutes. Open back up and continue flowing back. Choke open 11% and 350 PSI. Pressure slowly decreasing. At 03:30 choke open 11% and 333 PSI. 729 MSCF/Day. 3/9/2022 06:00 3/9/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. Present plan forward options to IMT. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 09:30 choke open 13% and 295 - 300 PSI. 729 MSCF/Day. 3/9/2022 12:00 3/9/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. Present plan forward options to IMT. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 17:00 choke open 13% and 262 PSI. 634 MSCF/Day, 29.5° F. 3/9/2022 18:00 3/10/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 23:15 choke open 13% and 238 PSI. 555 MSCF/Day, 24.5° F. 3/10/2022 00:00 3/10/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 04:00 choke open 13% and 223 PSI. 482 MSCF/Day, 22.5° F. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 35/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/10/2022 06:00 3/10/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 10:00 choke open 13% and 207 PSI. 448 MSCF/Day, 21° F. 3/10/2022 12:00 3/10/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 16:00 choke open 13% and 194 PSI. 375 MSCF/Day, 21° F. 3/10/2022 18:00 3/11/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 22:00 choke open 13% and 182 PSI. 306 MSCF/Day, 14° F. 3/11/2022 00:00 3/11/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. COP production continue flowback WD- 03 OA to CD1-48 tree cap back to production. At 04:00 choke open 13% and 450 PSI. 997 MSCF/Day, 40° F. Fluid level 684 ft. At 00:10 receive approval to access rig. Arrive at rig 00:30. Wrap wellhead in herculite, position flameless heater ducting down cellar. Open IA, no pressure or vacuum observed. Open FOSV and bleed off minimal pressure. Measure distance from head pin to saver sub, (8"). Measure distance from saver sub to FOSV (21 1/2"). Check Koomey pressure. Manifold, Accumulator and Annular ~100psi. Bottle bank 2100psi. Off rig by 01:30 3/11/2022 06:00 3/11/2022 10:30 4.5 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders from town. 3/11/2022 10:30 3/11/2022 11:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR T Mobilize freeze protect crew to rig. CoMan, Rig Super, Tool Pusher, Driller, Motor Man, DerrickMan and HSE. 3/11/2022 11:00 3/11/2022 13:00 2.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Operations turn over hot zone to drilling. R/U to freeze protect. Open saver sub door. M/U 90 to head pin. M/U chicksan and Lotorq valve. Perform rig inspection. Measure BOPE cellar door height at 16'. Wait on LRS to mobile to rig. 3/11/2022 13:00 3/11/2022 13:15 0.2 5 10,636.0 10,636.0 PROD1, CASING RURD T R/U LRS. Pull 602 hoses to rig floor. M/U bleed manifold and XO to Lotrorq valve. Double check valve alignment for pumping operations. 3/11/2022 13:15 3/11/2022 14:30 1.2 5 10,636.0 10,636.0 PROD1, CASING FRZP T PT lines to 2500 psi. LRS pump 90 bbls diesel at 90 degrees at 1 bpm. ICP 500 psi and FCP 300 psi. 700 psi max pressure observed. Full returns to tiger tank. 3/11/2022 14:30 3/11/2022 15:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD T Shut in drill pipe on TIW and Lotorq. Shut in IA on well head and Lotorq on tiger tank. R/D LRS. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 36/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/11/2022 15:00 3/11/2022 15:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR T Remove drill crew fro hot zone and back over to operations. Freeze portect crew back at camp at 15: 30 Hrs. 3/11/2022 15:30 3/12/2022 00:00 8.5 0 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders. Discuss plan forward options with town 3/12/2022 00:00 3/12/2022 10:00 10. 00 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on orders. Discuss plan forward options with town. Approval has been giving to install wellhead valve. Will proceed with this work in daylight hours. 3/12/2022 10:00 3/12/2022 12:00 2.0 0 10,636.0 10,636.0 PROD1, CASING OTHR T At 10:00 hrs Doyon Tool Pusher and CPAI HSE rep mobilize to rig to perform air quality inspection and evaluation. All gas reading inside and outside rig 0% LEL 3/12/2022 12:00 3/12/2022 15:30 3.5 0 10,636.0 10,636.0 PROD1, CASING WWSP T At 12:00 hrs CoMan, Doyon HSE, FMC and Wild Well mobilize to rig. Install OA annulus valve and install FMC lubricator test to 5000 psi for 5 min. (good). FMC pull VR plug and shut in annulus valve. R/D lubricator. Install second annulus valve and 1502 with cap and needle valve. Well secured at 15:30 hrs and all personnel exit location. 3/12/2022 15:30 3/12/2022 19:00 3.5 0 10,636.0 10,636.0 PROD1, CASING WAIT T Discuss plan forward options with town. At 18:00 hrs night CoMan mobilize to AOC and assume IMT lead for drilling during the night. 3/12/2022 19:00 3/13/2022 00:00 5.0 0 10,636.0 10,636.0 PROD1, CASING RURD T At 19:00 hrs night Tool Pusher and 3 hands mobilize to rig to start placing air heaters and thawing out rig. 3/13/2022 00:00 3/13/2022 04:00 4.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Continue to rig up heaters in centrifigul room and boiler room. Two drilling hands left on location to monitor air quality and watch running equipment. 3/13/2022 04:00 3/13/2022 08:45 4.7 5 10,636.0 10,636.0 PROD1, CASING WAIT T Wait on day light. Discuss plan forward options with town. Two drilling hands left on location to monitor air quality and watch running equipment. 3/13/2022 08:45 3/13/2022 11:00 2.2 5 10,636.0 10,636.0 PROD1, CASING RURD T Mobilize rig crew to location. Perform rig inspection. Significant ice damage to expansion boots and valves on mud pit processing equipment. Rig on high line at 10:30 hrs. Electric heaters and HVAC system on at 10:45 hrs and appear to be functioning properly. SIMOPS - work on getting generator up and running to provide power to site control shack. 3/13/2022 11:00 3/13/2022 13:00 2.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Discuss plan forward options with town. Two drilling hands left on location to monitor air quality and watch running equipment. 3/13/2022 13:00 3/13/2022 17:00 4.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Start up pipe shed heaters. C/O expansion boots in mud pits. Remove boiler feed pumps. Remove ice from boiler room. Monitor gas readings from perimeter of rig. 3/13/2022 17:00 3/13/2022 18:00 1.0 0 10,636.0 10,636.0 PROD1, CASING WAIT T Crew change at camp. Discuss plan forward and PJSM. Two drilling hands left on location to monitor air quality and watch running equipment. 3/13/2022 18:00 3/14/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Continue to C/O expansion boots. Receive two new boiler feed pumps and prep for C/O. Remove ice from boiler room. Monitor gas readings from perimeter of rig. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 37/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/14/2022 00:00 3/14/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Continue to C/O expansion boots. Receive two new boiler feed pumps and prep for C/O. Remove ice from boiler room. Monitor gas readings from perimeter of rig. 3/14/2022 06:00 3/14/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Remove ice from pump from and water from boiler room. C/O expansion boots and butterfly valves in charge pump room. Prep boilers for hot water. Get potable water and lavatory services going in pipe shed offices. Repair hot well solenoid. Monitor gas readings hourly from perimeter of rig. 3/14/2022 12:00 3/14/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Remove ice from pump from and water from boiler room. C/O expansion boots and butterfly valves in charge pump room. Prep boilers for hot water. Add hot water to boilers and hot well. Start boilers and stage up process. Monitor gas readings hourly from perimeter of rig. 3/14/2022 18:00 3/15/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Remove ice from rig. Induce steam to pump and pits modules. C/O steam dragon and plumbing in pump room. Back load SLB tools. Monitor gas readings hourly from perimeter of rig. 3/15/2022 00:00 3/15/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Remove ice from rig. Thaw out mud in pump room and charge pump room. Chase steam leaks and C/O steam dragon and plumbing in pump room. Blow air thru steam lines to rock washer. Remove and rebuild both wash down pumps. Monitor gas readings hourly from perimeter of rig. 3/15/2022 06:00 3/15/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Remove ice from rig. Thaw out mud in pump room and charge pump room. Mop up free standing water. Chase steam leaks and C/O plumbing as needed. C/O butterfly valves in pits. Top off hot well. Get steam to Off-load fluid from rock washer. Monitor gas readings hourly from perimeter of rig. 3/15/2022 12:00 3/15/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Thaw out mud in pump room and charge pump room. Mop up free standing water. Chase steam leaks and C/O plumbing as needed.Add hot water to pits and move fluid around to aid in thawing out mud pits. Thaw out pits to rock washer interconnect. Monitor gas readings hourly from perimeter of rig. 3/15/2022 18:00 3/16/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Thaw out mud in pump room and charge pump room. Mop up free standing water. Chase steam leaks and C/O plumbing as needed.Add hot water to pits and move fluid around to aid in thawing out mud pits. Thaw out pits to rock washer interconnect. Monitor gas readings hourly from perimeter of rig. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 38/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/16/2022 00:00 3/16/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Thaw out mud in pump room and charge pump room. Mop up free standing water. Chase steam leaks and C/O plumbing as needed.Add hot water to pits and move fluid around to aid in thawing out mud pits. Thaw out pits to rock washer interconnect. Monitor gas readings hourly from perimeter of rig. Anthony Roberts COP change out all batteries in gas senser 1-12 around rig. 3/16/2022 06:00 3/16/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Change out and inspect butterfly valves in pits. Clean and organize tools. Inspect mud pumps (pop off;s, valves, seats, suction/discharge screens, and manifolds) Start thawing out pit #7. Monitor gas readings hourly from perimeter of rig. 3/16/2022 12:00 3/16/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Change out and inspect butterfly valves in pits. Clean and organize tools. Inspect mud pumps (pop off;s, valves, seats, suction/discharge screens, and manifolds) Start thawing out pit #7Monitor gas readings hourly from perimeter of rig. 3/16/2022 18:00 3/17/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Change out and inspect butterfly valves in pits. Clean and organize tools. Inspect mud pumps (pop off;s, valves, seats, suction/discharge screens, and manifolds) Start thawing out pit #7 install scafling over hardlines and valves in cellar area. Pump out #3 pit 1/4 of pit frozen added water and steam, steam out rock wash pits Monitor gas readings hourly from perimeter of rig. 3/17/2022 00:00 3/17/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Change out and inspect butterfly valves in pits. Clean and organize tools. Inspect mud pumps (pop off;s, valves, seats, suction/discharge screens, and manifolds) Start thawing out pit #7 install scafling over hardlines and valves in cellar area. Pump out #3 pit 1/4 of pit frozen added water and steam, steam out rock wash pits Monitor gas readings hourly from perimeter of rig. 3/17/2022 06:00 3/17/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to thaw out trip tank Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits, Open up rig water to sub, Housekeeping on Rig floor, Bring wash down pumps to shop for rebuild Repair rod wash discharge line C/O damagaged valve in rock washer 3/17/2022 12:00 3/17/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Start to thaw out pit # 4 Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits, Open up rig water to sub, Housekeeping on Rig floor, C/O damagaged valve in rock washer bring 4" subs to rig floor to measurements. 3/17/2022 18:00 3/18/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, thaw #4 pit change out wash down pump lines, Housekeeping on Rig floor, go thru cellar secure all holes to out side.Empty trip tank to rock washer, Empty rock washer to truck Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 39/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/18/2022 00:00 3/18/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Run fluid thru test pump and lines and pressure tyest same. Move fluid around in piuts VIA gun liners. cont. thaw rock washer pit #1 Monitor Gas every hour around rig 3/18/2022 06:00 3/18/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Run fluid thru test pump and lines and pressure tyest same. Move fluid around in piuts VIA gun liners. cont. thaw rock washer pit #1 Monitor gas around rig every hour 3/18/2022 12:00 3/18/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Go thru rig ascceptance check list, grease and service choke manifold, Empty remain mud from pits to rock washer add 50 bbls water to pill pits for test lines for leaks in pits and rock washer. Monitor gas around rig every hour. 3/18/2022 18:00 3/19/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Go thru rig ascceptance check list, grease and service choke manifold, Empty remain mud from pits to rock washer add 50 bbls water to pill pits for test lines in pits and rock washer. Clean mud pits and rock washer pits. Monitor gas around rig every hour 3/19/2022 00:00 3/19/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Go thru rig ascceptance check list, grease and service choke manifold, Empty remain mud from pits to rock washer add 50 bbls water to pill pits for test lines in pits and rock washer. Clean mud pits and rock washer pits. Monitor gas around rig every hour 3/19/2022 06:00 3/19/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Go thru rig ascceptance check list, Test gas alarms via rig witness by AGOCC Brian Bixby Running charge pumps, priming mud pumps clean and pressure washng pits. Monitor gas around rig every hour Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 40/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/19/2022 12:00 3/19/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, change out wash down pump lines. Go thru rig ascceptance check list, Function Test BOPE and Choke Manifold witness by AGOCC Brian Bixby purge mud line to rig floor and pressure test to 4300 psi Blow down mud pumps, Cont. to clean and pressure wash in mud pits, Haredline crew R/U hard to choke manifold overboard line to tiger tank, empty pits and rock washer to super sucker truck Start preppuing pits to build mud Monitor gas around rig every hour 3/19/2022 18:00 3/19/2022 23:00 5.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, clean and maint.in centrifugal room Go thru rig ascceptance check list, go thru and prep for Dutch riser send Dutch riser to shop for repair. pressure wash MPD head and prep for upcomign removel. Monitor gas around rig every hour 3/19/2022 23:00 3/20/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING SFTY T Rig evac drill All teams familiarize themselves with muster areas and discuss plan forward. 3/20/2022 00:00 3/20/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. to inspect and change out butterfly valves /expansion joints boots in mud pits and charge pump room , cont, clean and maint.in centrifugal room Go thru rig ascceptance check list. Locate sub and tools need for plan forward.get pits ready to build mud. Monitor gas around rig every hour 3/20/2022 06:00 3/20/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Commision all mud pits and rock wshers equipment by moving fluid thru every pump and lines double check all. House keeping rig floor and BOPE deck, Run gen. to ensure rig is able to swap gen power and estops work properly, Conduct rig evacuation drill will all personel on location. Brting tools andf equipment to rig floor for 5 1/2" liner L/D operaions 3/20/2022 12:00 3/20/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. bring tools and equipment to rig floor for laying dowqn liner, Change out valve in charge pump room. Load pit 5 with 140 bbls water for mixing 10 ppg mud Quadco and rig electrican ran lines to sensors on OA and IA Blow down choke to tiger tank and test with 120 psi ( Good Test) R/U side entry sub and hose on drill string fore gtesting kelly hose and equip, 3/20/2022 18:00 3/21/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD T Cont. change out butterfly valves and expansion boot in charge pumping room. Take on 300 bbls H20 and build 300 bbls 10 ppg mud lsnd musd as per mud engineers Locate CPAI XO subs for up coming jobs 3/21/2022 00:00 3/21/2022 01:30 1.5 0 10,636.0 10,636.0 PROD1, CASING COND T Continue mixing 300 bbls of 10# LSND Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 41/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/21/2022 01:30 3/21/2022 02:00 0.5 0 10,636.0 10,636.0 PROD1, CASING SFTY XT PJSM with all hands involve with job task, contacted all parties Pad Ops, FOB IC, Wild Well, and Site Control Via radio 3/21/2022 02:00 3/21/2022 03:00 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT Check all pit valves when getting weighted fluid around the system Strap Tiger tank before starting diesel removal process from well. Blow air through choke & hard line to ensure its clear to tiger tank. PU Top Drive and install circ sub to circulate through TD and test IBOP & stand pipe to 4000 psi – blow down TD & Stand pipe. Close all choke valves and open HCR & wing valve on choke line – monitor for pressure Open choke valves/alignment to take well returns to Tiger tank Open Kill line HCR & wing valve Blow air from Kill line across stack to Tiger tank to ensure lines are clear 3/21/2022 03:00 3/21/2022 03:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT Attempt top circulate through kill line and choke unable to get returns after 40 strokes pump pressure up to 285 psi held bleed off pressure, pressured up again pump 10 strokes pressured up to 400 psi bleed pressure unable to clear line 3/21/2022 03:30 3/21/2022 09:30 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Work on thawing out choke line from BOPE to choke. 3/21/2022 09:30 3/21/2022 10:30 1.0 0 10,636.0 10,636.0 PROD1, CASING SFTY XT PJSM with all employees involved on circulating out diesel 3/21/2022 10:30 3/21/2022 11:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Rig up and stage employees aroundrig for circulating, ensure well is dead open upper rams and annular, pull slips 3/21/2022 11:00 3/21/2022 12:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT Shut upper rams, line up on on tiger tank, stage pumps up from 1/2 bpm @ 60 psi t/ 4 bpm @ 175 psi taking returns to tiger tank, @ 1000 stks get mud returns and pressure jumped to 280 psi mud eng. weighed 10 ppg mud on returns, shut down and blow down tiger tank line / total pumped 130 bbls with 130 bbls back to tiger tank 3/21/2022 12:00 3/21/2022 13:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Line up and pump 30 bbls down gas buster line @ 3 bpm w/ 100 psi, shut down monitor well (static), open upper rams blow down choke line 3/21/2022 13:00 3/21/2022 14:30 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT Line up and circulate well to warm well bore, 4 bpm, 160 psi, total stks= 3020 3/21/2022 14:30 3/21/2022 15:30 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Blow down top drive, monitor well (static), rig down side entry sub and tiw valve, get hole fill running 3/21/2022 15:30 3/21/2022 16:00 0.5 0 10,636.0 10,636.0 PROD1, CASING PULL XT Rack back 1 std 4'' dril pipe, 1 std 4'' hwdp, f/ 1,763' t/ 1,580' / rig up for laying down 5.5” liner Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 42/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/21/2022 16:00 3/21/2022 19:30 3.5 0 10,636.0 10,636.0 PROD1, CASING PULL XT Lay down liner hanger assy. as per baker rep, cont. laying down 5.5'' liner f/ 1,580' t/ 231' md. diesel was noticed in tubing. 3/21/2022 19:30 3/21/2022 21:00 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Install xo and tiw valves, Discuss with town plan forward to remove diesel from tubing. 3/21/2022 21:00 3/21/2022 21:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Line up to tiger tank via choke manifold, close ann, open hcr chk and circulate 164 stks @ 38 gpm, 77 psi holding 50 psi back press. via super chk. b/d tiger tank line. 3/21/2022 21:30 3/21/2022 22:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Open up ann. and circulate on pit 5 to verify 10.0ppg lsnd in/out. 64 gpm, 21% f/o, 205 stks pumped. b/d td. 3/21/2022 22:00 3/21/2022 22:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Cont. laying down 5.5" liner and shoe track f/ 231' md t/ surface using ddi pwr tongs. 3/21/2022 22:30 3/22/2022 00:00 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Clean and clear rig floor, l/d ddi csg tongs and handling tools via beaver slide. b/d chk/kill line prior t/ removing chk line. 3/22/2022 00:00 3/22/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT PJSM with all hands, Shut in manual choke and kill valves. remove choke hose install 4 way pressure block at HCR choke valve. Monitor well via trip tank, Check for gas every hr. around rig 3/22/2022 06:00 3/22/2022 11:00 5.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Rig up for testing bop's rig up test hoses, pump up sensators, prep test chart, together tiw and dart valves, pull wear ring and install test plug Purge air from all test lines and equpment, get good shell test 3/22/2022 11:00 3/22/2022 12:00 1.0 0 10,636.0 10,636.0 PROD1, CASING BOPE XT Test annular, upper rams, choke valves 1, 9, 11, 12, 13, 14, 250 psi low 4500 psi high witnessed by aogcc rep brian bixby 3/22/2022 12:00 3/22/2022 17:00 5.0 0 10,636.0 10,636.0 PROD1, CASING BOPE XT Cont. test bope all tests t/ 250 low 4,500 high for 5 charted min. w/ exception of manual operated & super choke tested t/ 2,500 psi, w/ 3.5" test jt test annular, 3.5" x 6" upr, 3.5" x 6" lpr, w/ 4 1/2" test jt test 3.5" x 6" upr & 3.5" x 6" lpr, test choke valves 1-14, manual operated & super choke, choke & kill manuals & hcr's, 4" valve on kill line, 4" fosv x2, 4" dart valve, upper & lower ibop; blind/ shear rams; perform koomey drawdown, acc = 3,000 psi. manif. = 1,500 psi. acc = 1,650 psi after all functions on bottles, 11 sec for 200 psi. build w/ 2 elec. pumps, 70 sec t/ build full sys. pressure w/ 2 elec. & 2 air pumps, closing times annular = 10 sec. upr = 5 sec. blind / shears = 5 sec. lpr = 5 sec. choke hcr = 2 sec. kill hcr = 2 sec; test pvt gain/loss and flow out alarms, test lel and h2s alarms; witnessed by aogcc rep brian bixby Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 43/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/22/2022 17:00 3/22/2022 19:00 2.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Blow down and rig down all test equipment, pull test plug and test joint install wear ring as per fmc. remove mpd trip nipple and install new o ring as per beyond rep. 3/22/2022 19:00 3/22/2022 21:00 2.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Prep for upcoming hcr install on oa, work on mp2's. remove derrick decent device and install newly certified device. wait on production team to arrive for oa surface valve install. monitor well via tt. 0 bbl gain/loss 3/22/2022 21:00 3/23/2022 00:00 3.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Assist production team on wd-03 OA valve installment on #43 well flowline and well #48 well flowline 3/23/2022 00:00 3/23/2022 06:00 6.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Assist production team on wd-03 OA HCR valves installment on #43 flowline and #48 well flowline #48 hydraulic control lines installed and functioned. Flowing OA to #48 #43 will be complete at 0600 hrs waiting on control line fitting. while bring brine fluid onto rig for displacement 3/23/2022 06:00 3/23/2022 08:30 2.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Cont. asst. production team installing hyd valves on wd-03 oa valves. cont. working on mp2's. cont. housekeeping around rig. cont. prep for cement retainer run. move hwdp to drillers side of derrick, install low torque valve, tees, sensors, and hard line from choke flow block to oa line, prep mud pits for on loading brine 3/23/2022 08:30 3/23/2022 12:00 3.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT Make up cement retainer as per baker rep, rih on 4'' drill pipe t/ 1,906' / break circulation @ 1/2 bpm 60 psi, blow down top drive / sim ops- cont rig up hard line from choke to oa and presure test t/ 2,500 psi, take on 10 ppg brine to mud pits 3/23/2022 12:00 3/23/2022 19:00 7.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Cont. rih w/ 4'' drill pipe w/ retainer f/ 1,906' t/ 9,095', pu=170k, so=142k / sim opscont take on 10 ppg brine to mud pits 3/23/2022 19:00 3/23/2022 20:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT OWFF 15 min. remove mpd trip nipple, replace air boot, install mpd drip nipple. warm up mpd bearing 3/23/2022 20:00 3/23/2022 21:00 1.0 0 10,636.0 10,636.0 PROD1, CASING MPDA XT Line up mpd chk skid and rih f/ 9095 t/ 9176' md. m/u 15' pup. rih t/ 9200' md 3/23/2022 21:00 3/23/2022 22:45 1.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT Condition mud & circulate. stage up t/ 150 gpm, 1217 psi, 34% f/o. simops m/u cement pump in sub. 3084 stks pumped 3/23/2022 22:45 3/24/2022 00:00 1.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT Set baker cement retainer as per baker rep. originial p/u 172k, s/ol 142k, turn 10 wraps t/ right. p/u 20k over, s/o 20k. p/u 30k, s/o 30k. cement retainer set @ 9200' md 3/24/2022 00:00 3/24/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT Pressure test top of retainer and annulus above retainer 2500 psi 5 min Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 44/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/24/2022 00:30 3/24/2022 02:45 2.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT Establish injection rates 1St attept 1/8 bpm 730psi, 2 1/2 bpm 2500 psi reached max psi 10 bbls pumped . stopped bleed off 2nd attempted 1/2 bpm 1650 psi 1 3/4 bpm reached 2500 max psi,stop bleed off 5 bbls pumped 3rd attempt 1/2 bpm 1850 psi broke over to 1400 psi 1 bpm pressure incresed to 2500 psi max pressure. stop bleed psi, made call to town superintendent. 4th attempt 1 bpm 2340 psi 2 bpm 2450 pumping in at 2 bpm 10 bbls pumped. Made call to town approval to move ahead with plan forward 3/24/2022 02:45 3/24/2022 05:00 2.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT Release from retainer Displace well with 10.0 pgg NACI/KCI brine 3/24/2022 05:00 3/24/2022 06:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/U cement control head and lines 3/24/2022 06:00 3/24/2022 08:30 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT Circulate and condition fluid @ 1.5 bpm @ 38 psi 3/24/2022 08:30 3/24/2022 11:00 2.5 0 10,636.0 10,636.0 PROD1, CASING CMNT XT PJSM with all employees for cementing / slb pump 3 bbls h2o and pt lines t/ 3500 psi, pump 15.3 bbls of 11.5 ppg mud push, 25.5 bbls 15.8 ppg cmt, 5.2 bbls 11.5 ppg mud push, 20 bbls fresh h2o, swap to rig chase w/ 31 bbls @ 4 bpm w/ 16 psi sting into retainer and cont pumping 26 bbls @ 1 bpm fcp 2,830 psi, un-sting from retainer psi fell off, open drill string and notice u- tubing up drill pipe, pump 2 bbls down drill pipe and still u-tubing, pump out 3 stands @ 1 bbl per stand and pull 1 dry, f/ 9,198' t/ 8,905 3/24/2022 11:00 3/24/2022 12:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CBU stk @ 10 bpm 1800 psi 3/24/2022 12:00 3/24/2022 13:30 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT Cont. cbu stk @ 10 bpm 1800 psi, total stks 7,535 / rack 1 std back f/ 8,905' t/ 8,811' 3/24/2022 13:30 3/24/2022 15:00 1.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT Moitor well / pjsm, pull mpd bearing as per beyond rep / blow down injection line and mpd skid 3/24/2022 15:00 3/24/2022 16:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT Prep 2.41'' driftw/ slick line, attempt to put in string but to big, decision made to come out of the hole 3/24/2022 16:00 3/24/2022 21:30 5.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH w/ 4'' dp f/ 8,622' t/3879' pu=98k / drop drift @ 5,689'. retreaved drift @ 3893'. 3/24/2022 21:30 3/24/2022 22:45 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT Pump cement wiper ball dwn pipe @ 5bpm, 356 psi, 32% f/o 3160 stks pumped. attempt to drop drift again. unable to drift pipe 3/24/2022 22:45 3/25/2022 00:00 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT Cont. POOH w/ 4" dp f/ 3879' md t/ 1906' md p/u 60k, s/o 62k. 3/25/2022 00:00 3/25/2022 01:00 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Cont. POOH w/ 4" dp f/ 3879' md t/ 1906' md p/u 60k, s/o 62k. 3/25/2022 01:00 3/25/2022 02:15 1.2 5 10,636.0 10,636.0 PROD1, CASING BHAH XT L/D BAker retainer running tools assy, clear rig floor tools and equip blow down choke and kill lines. 3/25/2022 02:15 3/25/2022 08:30 6.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT PJSM Spot Halliburton wireline equip and tools R/U same. P/U ACX tool RIH to 3750' Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 45/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/25/2022 08:30 3/25/2022 15:00 6.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Wire line reach stopping depth and start coming out of hole logging / sim-ops cont. load pipe shed with 3.5'' tubing 3/25/2022 15:00 3/25/2022 16:30 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Approval f/ town.r/d & l/d wireline tools. wait on aogcc rep to witness plug test 3/25/2022 16:30 3/25/2022 17:30 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Pressure test abandonment plug t/ 2450 psi, 30 stks, 30 min charted. test witnessed by aogcc rep adam earl. 3 bbl bled back 3/25/2022 17:30 3/25/2022 21:30 4.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Bring up csg equip and xo's t/ rig floor. rig up ddi csg 3/25/2022 21:30 3/26/2022 00:00 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH w/ 3.5" 9.3# l-80 eue tbg f/ surface t/ 1,461' md, s/o wt= 64k. monitoring displacement via trip tank 3/26/2022 00:00 3/26/2022 05:00 5.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT Cont. RIH w/ 3.5" 9.3# l-80 eue tbg f/ surface t/ 1,461' to 4894' md, s/o wt= 64k. monitoring displacement via trip tank 3/26/2022 05:00 3/26/2022 06:30 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT M/U HES BHKA disconnect subs ad XO's as per HES rep. @ 4930' 3/26/2022 06:30 3/26/2022 07:15 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ 3.5" 9.3 # L-80 HYD 563 TBG F/ 4,900' MD T/ 5417' MD, S/O WT= 84K, P/U WT= 88K MONITORING DISPLACEMENT VIA TRIP TANK. M/U TQ= 3K 3/26/2022 07:15 3/26/2022 12:00 4.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT INSTALL HYD 563 X XT-39 XO AND RIH W/ 4" DP DRIFTING OUT OF DRK. F/ 5417' MD T/ 8667' MD 3/26/2022 12:00 3/26/2022 14:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ 4" DP DRIFTING OUT OF DRK. F/ 8667' MD T/ 9161' MD. TAG CEMENT @ 9161' MD. P/U 138K S/O 117K AOGCC WITNESS REP ADAM EARL CEMENT TAG. 3/26/2022 14:00 3/26/2022 16:30 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT RACK BACK 1 STD AND SINGLE. CIRC. AND COND. BRINE. @ 8991' MD, 5 BPM, 523 PSI, 36 % F/O 4250 STKS PUMPED 3/26/2022 16:30 3/26/2022 18:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT PJSM W/ ALL HANDS, R/U CEMENTERS, AND CEMENT LINE ON RIG FLOOR, CIRC THROUGH CEMENT LINE 3/26/2022 18:00 3/26/2022 18:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT FINISH R/U FOR CEMENT JOB 3/26/2022 18:30 3/26/2022 20:45 2.2 5 10,636.0 10,636.0 PROD1, CASING CMNT XT CEMENTERS PUMP 5 BBLS FRESH WATER, TEST SURFACE LINES T/ 5,000 PSI (TEST GOOD). PUMP 25.2 BBLS 11.5# MUD PUSH II, PUMP 211.3 BBLS 15.8# CEMENT. DROP PLUG, PUMP 5 BBLS 11.5# MUD PUSH II FOLLOWED BY 10# BRINE. CHASE PLUG @ 5 BPM, 266 PSI, 35% F/O. @ 20 BBLS AWAY SLOW DOWN T/ 3 BPM, 650 PSI, 28% F/O. @ 33.8 BBLS AWAY OBSERVE PSI SPIKE T/ 1,559 PSI AND FALL OFF @ 4100 MD , OBSERVE 28K LOSS IN HOOKLOAD F/ 121K T/ 93K. DISCONNECT CONFIRMED @ 4100' MD 3/26/2022 20:45 3/26/2022 21:00 0.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT R/D HEAD PIN, L/D 15' PUP JT. M/U SINGLE T/ STD #38 AND RACK BACK IN DERRICK F/ 4100' MD T/ 3,500' MD Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 46/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/26/2022 21:00 3/26/2022 21:45 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT ROT AND CIRC F/ 3,500' MD T/ 3,311' MD @ 512 GPM, 1,062 PSI, 52% F/O, 20 RPM, 1.5K TQ. TOTAL STKS PUMPED= 3,849 (391 BBLS). CIRC B/U ON STD #37, PUMP WIPER BALL AND CIRC S/S ON STD #36. 3/26/2022 21:45 3/26/2022 22:00 0.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT B/D TOP DRIVE AND INSTALL PIPE WIPER AND AIR SLIPS 3/26/2022 22:00 3/27/2022 00:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH ON ELEVATORS F/ 3,311' MD T/ 618' MD, P/U WT= 82K. MONITORING HOLE FILL VIA TRIP TANK. CLEAN CEMENT VALVES. 3/27/2022 00:00 3/27/2022 01:45 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT R/U DOYON TUBING TONG TO LAY DOWN 3.5" 563 HYD 17 JOINTS AND DISCONNECT RUNNING TOOL. 3/27/2022 01:45 3/27/2022 03:00 1.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT R/D DOYON TUBING TONGS AND EQUIPMENT CLEAR RIG FLOOR/ BRING BAKER CLEAN OUT RUN TOOLS TO RIG FLOOR 3/27/2022 03:00 3/27/2022 03:30 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U BAKER CLEAN OUT BHA 3/27/2022 03:30 3/27/2022 06:00 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH F/ BHA TO 3600' 3/27/2022 06:00 3/27/2022 07:30 1.5 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT TO ACHIEVE 100 PSI COMPRESSION STRENGTH PER SCHLUMBERGER 3/27/2022 07:30 3/27/2022 09:00 1.5 0 10,636.0 10,636.0 PROD1, CASING WASH XT WASH F/ 3612' MD T/ 4175' MD PULL BACK T/ 4081' MD AND PUMP 1.5 BPM 125 PSI, 27% F/O. P/U 91K, S/O 94K 3/27/2022 09:00 3/27/2022 09:45 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION, CIRCULATE AT 342 GPM, 1212 PSI, 45 % F/O 1467 STK PUMPED 3/27/2022 09:45 3/27/2022 10:30 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT B/D T/D POOH F/ 4081' T/ 3612' MD P/U 91K S/O 89K 3/27/2022 10:30 3/27/2022 11:00 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT SCRAPE F/ 3612' T/ 3578' @ 215 GPM, 434 PSI, 37% F/O, 30 RPM, 2K TQ, 3/27/2022 11:00 3/27/2022 12:30 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND RIC. @ 5 BPM, 430 PSI, WAIT ON CEMENT 3/27/2022 12:30 3/27/2022 13:00 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT B/D TD RIH F/ 3578' T/ 3612' WAIT ON CEMENT AND STATE REP 3/27/2022 13:00 3/27/2022 15:30 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ 3612' T/ 4179' TAG CEMENT. P/U T/ 4176' MD 3/27/2022 15:30 3/27/2022 16:15 0.7 5 10,636.0 10,636.0 PROD1, CASING PRTS XT CIRCULATE STS STKS 1708 STKS, 9BPM, 1481 PSI, 48% F/O. R/U CEMENT HOSE AND PRESSURE TEST CEMENT PLUG T/ 1500 PSI, CHARTED, TEST WITNESSED BY AOGCC REP ADAM EARL. 11 STKS PUMPED. 1.4 BBL BLED BACK 3/27/2022 16:15 3/27/2022 18:00 1.7 5 10,636.0 10,636.0 PROD1, CASING RURD XT R/D TEST EQUIPMENT 3/27/2022 18:00 3/27/2022 18:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAR LINES IN PITS W/ LCM BRINE TO NOT CONTAMINATE TRIP TANK 3/27/2022 18:30 3/27/2022 19:15 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH ON ELEVATORS F/ 4,176' MD T/ 17' MD, MONITORING HOLE FILL VIA TRIP TANK 3/27/2022 19:15 3/27/2022 21:15 2.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT L/D CLEAN OUT BHA PER BAKER HUGHES REP 3/27/2022 21:15 3/27/2022 21:30 0.2 5 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U CIBP PER BAKER HUGHES REP F/ SURFACE T/ 14' MD Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 47/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/27/2022 21:30 3/27/2022 21:45 0.2 5 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR OF BHA COMPONENTS 3/27/2022 21:45 3/27/2022 23:45 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ 14' MD T/ 3,590' MD, MONITORING DISPLACEMENT VIA TRIP TANK. P/U WT= 89K, S/O WT= 87 3/27/2022 23:45 3/28/2022 00:00 0.2 5 10,636.0 10,636.0 PROD1, CASING PACK XT @ 3,590' SET CIBP PER BAKER HUGHES REP. 3/28/2022 00:00 3/28/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F 3590' MD TO 3570' MD P/U WT 90K R/U AND TEST CIBP 3/28/2022 00:30 3/28/2022 00:45 0.2 5 10,636.0 10,636.0 PROD1, CASING PRTS XT TEST CIBP TO 2000 PSI F/ 10 MIN ( TEST GOOD) BLEED BACK 1 BBL TO TRIP TANK 3/28/2022 00:45 3/28/2022 01:00 0.2 5 10,636.0 10,636.0 PROD1, CASING RUNL XT R/D TESTING EQUIPMENT 3/28/2022 01:00 3/28/2022 01:15 0.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ 3570' MD TOP 3585' MD VERIFY READY TO DISPLACEMENT 3/28/2022 01:15 3/28/2022 02:15 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT DISPLACE WELL F/ 10 PPG BRINE TO 10 PPG BRINE W/ 50 LB/BBL LCM TOTAL STROKES PUMPED = 2917 (297 BBLS) B/D TOP DRIVE 3/28/2022 02:15 3/28/2022 04:15 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOOH ON ELEVATORS F/ 3585' MD TO SURFACE MONITORING HOLE FILL VIA PIT # 5 3/28/2022 04:15 3/28/2022 09:30 5.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT P/U SCHLUMBERGER 2.5" 20' 6 SHOTS PER FOOT, 60 DEG PHASE 121 TOTAL SHOTS TCP GUNS AND FIRING HEAD, AND FLOAT SUB AND RIH ON 4" DP OUT OF DRK T/ 3457' MD. FILLING ON STD 20. MONITOR DISP VIA PIT 5. P/U 79K, S/O 77K 3/28/2022 09:30 3/28/2022 11:30 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT M/U 15' PUP JT, TIW VALVE, AND SIDE ENTRY SUB, SPACE OUT IN BOP'S @ 3477' MD. CIRCULATE @ 1BPM, 105 PSI, 19% F/O. 3/28/2022 11:30 3/28/2022 12:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT B/D T/D, CHOKE, KILL, AND TIGER TANK, SIOMOPS BUILD 80 BBL LCM PILL IN PITS. 3/28/2022 12:00 3/28/2022 15:00 3.0 0 10,636.0 10,636.0 PROD1, CASING SFTY XT PJSM W/ ALL HANDS INVOLVED ON WELL KILL OPERATIONS. PRACTICE RUN PRESSURE RAMP FOR FIRING GUNS. 3/28/2022 15:00 3/28/2022 19:00 4.0 0 10,636.0 10,636.0 PROD1, CASING PERF XT FIRE GUNS AS PER SLMB REP. VERIFY GUNS FIRED AND CIRCULATE @ 5BPM DOWN KILL LINE 1184 PSI BREAK OVER, AFTER 4858 STKS PUMPED LCM PILL @ 3 BPM, 440 PSI, STAGE DWN T/ 2BPM, 378 PSI, SHUT IN @ 6106 STKS. MONITOR PRESSURES. DP PRESS 178 PSI, WAIT ON PRODUCTION TO SHOOT FLUID LEVEL. FLUID LEVEL FOUND @ 132' MD TOP SHOT 3450' 3470' BOTTOM SHOT Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 48/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/28/2022 19:00 3/28/2022 23:00 4.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT MONITOR IA AND OA PSI PER CO. MAN FINGER PRINT WELL BLEED IA FROM 348 PSI WITH 30 SEC INTERVALS BLEED TO 0 PSI TOTAL BLEED BACK 27.4 BBLS SHUT IN MONTIOR PRESS NO CHANGE IN PRESS. DHD SHOT FLUID LEVELS @ 132' PUMP 50 BBLS ACROSS OA STILL NO RETURNS TO SURFACE. DHD SHOT FLUID LEVELS @ 32' PUMPED 32 BBLS DOWN OA STILL NO RETURNS TO SURFACE. 3/28/2022 23:00 3/29/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT BLEED OFF IA T/ 0 PSI, VERIFY 0 PSI ON DP AND CSG AND OPEN ANNULAR. OWFF- WELL STATIC. B/D CHOKE MANIFOLD AND KILL LINE. LINE UP IN PITS TO PUMP 9.5 PPG 30 LB/BBL BRINE ACROSS THE TOP. PUMP 10 BBLS DOWN OA NO RETURNS TO SURFACE. 3/29/2022 00:00 3/29/2022 03:00 3.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT PUMP ACROSS THE TOP OF IA WITH 9.5 PPG 30 PPB LCM BRINE, AND MONITOR AT TRIP TANK. EVERY HOUR PUMP 10 BBLS 9.5 PPG 30 PPB LCM BRINE DOWN OA AND RECORD PRESSURES 3/29/2022 03:00 3/29/2022 03:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT NOTICE RETURNS FROM F/ OA WHEN PUMPING @ 300 HRS CONT. TO PUMP WITH CHARGE PUMP AND DUMP 21 BBLS OF CONTAMINATED FLUID TO ROCK WASHER SHUT DOWN SHUT IN CHOKE MONMITOR FOR PRESSURE PRESSURE WAS ZERO. MADE CALL TO SUPERVISORS IN ANCHORAGE OF FINDINGS 3/29/2022 03:30 3/29/2022 04:30 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT CONT TO PUMP ACROSS THE TOP WITH 9.5 PPG 30 PPB LCM BRINE AND MONTIOR WELL 3/29/2022 04:30 3/29/2022 07:00 2.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT CHECK OA FOR PRESSURE OBSERVE FLOW AT SAMPLE PORT SHUT IN UPPER PIPE RAMS OPE KILL LINE TO ISOLATE MUD MANIFOLD. OBSERVE AND RECORD PRESSURE AT OA AND IA. MADE CALL TO SUPERVISORS IN ANCHORAGE. 3/29/2022 07:00 3/29/2022 08:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND COND. MUD @ IA TO 9.6 PPG. 385 GMP, 527 PSI, 47% F/O 1727 STKS PUMPED. 3/29/2022 08:00 3/29/2022 10:00 2.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT SHUT UPPER PIPE RAMS, LINE UP TO PUMP DWN DP, TAKE RETURNS F/ OA VIA CHK MANIFOLD AND GAS BUSTER. PUMP 84.5 BBL PUMPED, @ 1 BPM, 488 PSI, NO RETURNS SEEN 2 BPM 480 PSI 3 BPM 554 PSI 4 BPM 554 PSI NO RETURNS 3/29/2022 10:00 3/29/2022 11:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT B/D T/D, STEP DOWN BLEED OF IA, STARTING PRESSURE 392 PSI, STEP DOWN TO ZERO PSI. BLED BACK 38 BBL. 3/29/2022 11:00 3/29/2022 11:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT B/D T/D, CHOKE MANIFOLD ON RIG FLOOR AND CHOKE T IN CELLAR. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 49/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/29/2022 11:30 3/29/2022 12:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION MUD. DOWM IA 385 GPM,527 PSI, 47% F/O 3/29/2022 12:00 3/29/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CONT. CIRCULATE AND CONDITION MUD DOWN IA . 385 GPM,527 PSI, 47% F/O 1932 STKS PUMPED 3/29/2022 12:30 3/29/2022 13:30 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT OWFF VERIFY STATIC 3/29/2022 13:30 3/29/2022 18:15 4.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH ON ELEVATORS F/ 3,470' MD T/ 52' MONITOR DISP. VIA P #5. P/U 89K S/O 87K 3/29/2022 18:15 3/29/2022 19:00 0.7 5 10,636.0 10,636.0 PROD1, CASING BHAH XT L/D GUNS AND RUNNING TOOL PER SLB REPS 3/29/2022 19:00 3/29/2022 20:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR, BRING WIRELINE EQUIPMENT UP 3/29/2022 20:00 3/29/2022 20:30 0.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT R/U TO WIRELINE 3/29/2022 20:30 3/29/2022 23:45 3.2 5 10,636.0 10,636.0 PROD1, CASING ELOG XT PERFORM WIRELINE RUN #1 RADIAL BOND TOOL T/ 3,560' MD 3/29/2022 23:45 3/30/2022 00:00 0.2 5 10,636.0 10,636.0 PROD1, CASING ELOG XT L/D WIRELINE TOOLS 3/30/2022 00:00 3/30/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT CONT. L/D WIRELINE TOOLS 3/30/2022 00:30 3/30/2022 02:00 1.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT HES SENDING LOGS TO TOWN FOR APPROVAL OF NEXT RUN 3/30/2022 02:00 3/30/2022 03:00 1.0 0 10,636.0 10,636.0 PROD1, CASING ELOG XT MOBILIZE LUBRICATOR TOOLS ASSY TO RIG FLOOR 3/30/2022 03:00 3/30/2022 04:15 1.2 5 10,636.0 10,636.0 PROD1, CASING ELOG XT RIG UP LUBRICATOR ASSY AND CLOSE UPPER PIPE RAMS ON IT, M/U WIRELINE TOOLS ACX AND TEMPERTURE LOG 3/30/2022 04:15 3/30/2022 11:30 7.2 5 10,636.0 10,636.0 PROD1, CASING ELOG XT RIH WIRELINE TOOLS #2 ACX AND TEMPERTURE LOG 3/30/2022 11:30 3/30/2022 12:00 0.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT R/D WIRELINE TOOLS AND EQUIPMENT. 3/30/2022 12:00 3/30/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT WAIT ON TOWN. 3/30/2022 12:30 3/30/2022 16:15 3.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT 6 M/U BAKER CEMENT RETAINER. RIH ON 4" DP, F/ SURFACE T/ 3,416' M/D. P/U 88K, S/O 86K. SIMOPS LINE UP ON OA F/ MP INJECTION LINE, LINE UP CHK MANIFOLD T/ GAS BUSTER. PUMP W/ CHARGE PUMP VIA INJ LINE 68.7 BBL. 10 BBL TO FILL. 3/30/2022 16:15 3/30/2022 17:45 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT P/U SPACE OUT PUPS AND SET CEMENT RETAINER @ 3,430' MD AS PER BAKER REP AND PRESSURE TOP OF RETAINER T/ 1500 PSI, CHARTED. P/U 88K S/O 87K. RELEASE OUT OF RETAINER AS PER BAKER REP. STING BACK IN RETAINER. 3/30/2022 17:45 3/30/2022 19:00 1.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT RIG UP FOR INJ. TEST 3/30/2022 19:00 3/30/2022 19:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT PERFORM INJECTIVITY TEST, 1BPM= 252 PSI, 2BPM= 790 PSI, 3 BPM= 750 PSI. OBSERVE BREAK OVER @ 850 PSI. INJECTED TOTAL OF 14 BBLS. 3/30/2022 19:30 3/30/2022 20:30 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT B/D CEMENT LINE, FINISH R/U CEMENTERS, HOLD PJSM Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 50/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/30/2022 20:30 3/30/2022 21:00 0.5 0 10,636.0 10,636.0 PROD1, CASING SQEZ XT FLUSH 2 BBLS FRESH WATER, TEST SURFACE LINES T/ 4,000 PSI (TEST GOOD). 3/30/2022 21:00 3/30/2022 22:45 1.7 5 10,636.0 10,636.0 PROD1, CASING SQEZ XT CEMENTERS BATCH UP MUD PUSH AND MIX WATER. CLOSE ANNULAR, PUMP DOWN KILL LINE AND TRAP 190 PSI ON BACKSIDE. 3/30/2022 22:45 3/31/2022 00:00 1.2 5 10,636.0 10,636.0 PROD1, CASING SQEZ XT CEMENTERS PUMP 20 BBLS 10.5 PPG MUD PUSH II, 43 BBLS 12 PPG CEMENT, 5 BBLS 10.5 PPG MUD PUSH AND CHASE W/ 27.5 BBLS 9.5 PPG BRINE 3/31/2022 00:00 3/31/2022 00:15 0.2 5 10,636.0 10,636.0 PROD1, CASING CMNT XT BLEED OFF BACKSIDE, VERIFY ZERO PSI, OPEN ANNULAR. STING OUT OF RETAINER F/ 3,430' MD T/ 3,425' MD. P/U WT= 91K. CIRC B/U @ 6 BPM, 381 PSI, 36% F/O. TOTAL STKS PUMPED= 1,417 (144 BBLS) NOTE NO RETURN FROM OA DURING CEMENT JOB 3/31/2022 00:15 3/31/2022 00:45 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/D CEMENT HOSE AND POOH F/ 3,425' T/ 3,416' MD. L/D CIRC. SUB ASSEMBLY 3/31/2022 00:45 3/31/2022 02:00 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT DROP NERF BALL AND CIRC S/S @ 6 BPM, 410 PSI, 36% F/O. TOTAL STKS PUMPED= 1,875 (191 BBLS). B/D TOP DRIVE AND KILL LINE 3/31/2022 02:00 3/31/2022 03:30 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH ON ELEVATORS F/ 3,416' MD T/ SURFACE, P/U WT= 85K. MONITORING HOLE FILL VIA TRIP TANK 3/31/2022 03:30 3/31/2022 03:45 0.2 5 10,636.0 10,636.0 PROD1, CASING BHAH XT L/D RETAINER RUNNING TOOL PER BAKER HUGHES REP 3/31/2022 03:45 3/31/2022 04:15 0.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR FLOOR, BRING WIRELINE EQUIPMENT UP 3/31/2022 04:15 3/31/2022 05:00 0.7 5 10,636.0 10,636.0 PROD1, CASING RURD XT R/U WIRELINE EQUIPMENT 3/31/2022 05:00 3/31/2022 08:30 3.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT RIH W/ TEMPATURE LOGGING TOOLS, LOG F/ 3430' TO 2400 WLM 3/31/2022 08:30 3/31/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT L/D WIRELINE TOOLS P/U USIT LOGGING TOOLS RIH 3/31/2022 09:00 3/31/2022 12:00 3.0 0 10,636.0 10,636.0 PROD1, CASING ELOG XT RUN USIT LOGS FROM 3430' TO 2400' AS HES AND COP PROGRAM 3/31/2022 12:00 3/31/2022 17:00 5.0 0 10,636.0 10,636.0 PROD1, CASING ELOG XT CONT. RUN USITR LOG FROM 3430' TO 2400' AS PER COP AND HES PROGRAM 3/31/2022 17:00 3/31/2022 17:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT L/D WIRELINE TOOLS WAIT FOR BRIDGE PLUG FROM DEADHORSE, SIMOPS R/U TEST CEMENT RETAINER 3/31/2022 17:30 3/31/2022 20:00 2.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT TEST CEMENT RETAINER T/ 1500 PSI, CHARTED F/ 30 MIN. (TEST GOOD) 3/31/2022 20:00 3/31/2022 20:15 0.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT R/U WIRELINE 3/31/2022 20:15 3/31/2022 21:45 1.5 0 10,636.0 10,636.0 PROD1, CASING ELOG XT PERFORM WIRELINE RUN W/ CIBP. SET CIBP @ 3,190' MD, CONFIRM DEPTH SET AT 3/31/2022 21:45 3/31/2022 22:15 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/D WIRELINE EQUIPMENT 3/31/2022 22:15 3/31/2022 23:30 1.2 5 10,636.0 10,636.0 PROD1, CASING PRTS XT TEST TOP OF CIBP T/ 2,000 PSI F/ 15 MIN (TEST GOOD), B/D KILL LINE Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 51/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 3/31/2022 23:30 4/1/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT PREP F/ P/U GUN BHA 4/1/2022 00:00 4/1/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U SLB PERF GUN 20' BLANK 5' 60 DEG 121 TO SHOT 6 SHOTS PER FOOT 4/1/2022 00:30 4/1/2022 03:30 3.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH WITH PERF GUNS TO 3170' P/U 78 S/O 80K 4/1/2022 03:30 4/1/2022 04:30 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT M/U TIW' AND SIDE DOOR CIRC PUPS 4/1/2022 04:30 4/1/2022 06:00 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION FLUID SURFACE TO SURFACE. 4/1/2022 06:00 4/1/2022 08:00 2.0 0 10,636.0 10,636.0 PROD1, CASING PERF XT FIRE GUNS AS PER SLB REP AND PERFORATE CSG F/ 3150' T/ 3170'. OPEN CHOKE MANIFOLD T/ MGS AND ATTEMPT TO CIRCULATE. STAGE UP FLOW RATE TO 1.5BPM, 930PSI SPP. NO RETURNS. TOTAL 51BBL INJECTED. SHUT DOWN PUMPS AND TRAP 600PSI. 4/1/2022 08:00 4/1/2022 10:00 2.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT ISOLATE RETURNS TO PIT 5. PERFORM STEP DOWN BLEED OFF F/ 680PSI SPP T/ 0PSI SPP. 20.5BBL BLED BACK. 4/1/2022 10:00 4/1/2022 10:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU W/ 214GPM, 220PSI, 33% FLOW OUT. MW OUT 9.1PPG @ BU. 4/1/2022 10:30 4/1/2022 12:00 1.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOW CHECK WELL. 4/1/2022 12:00 4/1/2022 12:45 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU W/ 215GPM, 220PSI, 33% FLOW OUT. 4/1/2022 12:45 4/1/2022 17:00 4.2 5 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOW CHECK WELL. 4/1/2022 17:00 4/1/2022 17:45 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU W/ 217GPM, 220PSI, 33% FLOW OUT. MW OUT 9.4+ PPG @ BU. 4/1/2022 17:45 4/1/2022 23:15 5.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOW CHECK WELL. TIME RETURNS TO VIS CUP. RETURNS DECREASE TO 210 SEC/QT (0.1BPH) AND STABILIZE. CONCURRENTLY LAY DOWN KILL ASSEMBLY AND PERFORM DERRICK MANAGEMENT. BEGIN TRANSFER OUT 9.5PPG BRINE AND CLEAN PITS. TIME SEC/QT 20:00 185 20:15 197 20:30 197 21:00 251 21:15 210 21:30 193 21:45 205 22:00 201 22:15 195 22:30 215 22:45 215 4/1/2022 23:15 4/2/2022 00:00 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU W/ 215GPM, 175PSI, 33% FLOW OUT. MW OUT 9.4 PPG @ BU. NO BU GAS. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 52/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/2/2022 00:00 4/2/2022 04:30 4.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOW CHECK WELL. TIME RETURNS TO VIS CUP. RETURNS DECREASE TO 345 SEC/QT (0.06BPH) ON DECLINING TREND. CONTINUE TRANSFER OUT 9.5PPG BRINE AND CLEAN PITS. TAKE ON FIRST LOAD OF 12.0PPG BRINE. CHANGE OUT VALVE AND SEATS ON MP#1. TIME SEC/QT 00:00 143 00:15 226 00:30 240 00:45 267 01:00 251 01:15 255 01:30 201 01:45 214 02:00 276 02:30 176 03:00 318 03:30 322 04:00 368 04:30 345 4/2/2022 04:30 4/2/2022 06:30 2.0 0 10,636.0 10,636.0 PROD1, CASING PULD XT RACK BACK STAND 4" DP. STRIP OFF RCD BEARING AND LAY DOWN STAND 4" DP. 4/2/2022 06:30 4/2/2022 08:15 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT PULL OOH W/ TCP GUNS F/ 2,984' T/ SURFACE. MONITOR HOLE FILL ON TRIP TANK. RACK PIPE ON DRILLERS SIDE. 4/2/2022 08:15 4/2/2022 08:30 0.2 5 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOW CHECK WELL. STATIC. CONCURRENTLY HOLD PJSM FOR LAYING DOWN TCP. 4/2/2022 08:30 4/2/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING PULD XT LAY DOWN SLB GUNS AS PER SLB REP. NOTE: 6 SPF (121 SHOTS). ALL SHOTS FIRED 4/2/2022 09:00 4/2/2022 10:15 1.2 5 10,636.0 10,636.0 PROD1, CASING SFTY XT CLEAN AND CLEAR RIG FLOOR. 4/2/2022 10:15 4/2/2022 12:00 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT MU MULE SHOE AND RIH F/ SURFACE T/ 1900'. MONITOR DISPLACEMENT ON TT. 4/2/2022 12:00 4/2/2022 13:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT FILL PIPE AND ATTEMPT TO CIRCULATE. PRESSURE UP TO 1000PSI SPP. BLEED OFF PRESSURE. ATTEMPT TO CIRCULATE AND STRING PRESS UP. BLOW DOWN TOP DRIVE. 4/2/2022 13:00 4/2/2022 15:15 2.2 5 10,636.0 10,636.0 PROD1, CASING PULD XT SINGLE OOH AND LAY DOWN 4" DP WET F/ 1900' TO SURFACE. MONITOR HOLE FILL ON TT. 4/2/2022 15:15 4/2/2022 15:45 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT LAY DOWN MULE SHOE ASSEMBLY AND INSPECT SAME. CLEAN OUT LCM PLUG FROM TOP OF FLOAT. 4/2/2022 15:45 4/2/2022 18:00 2.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT MU MULE SHOE AND RIH F/ SURFACE T/ 3,124'. MONITOR DISPLACEMENT ON TT. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 53/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/2/2022 18:00 4/2/2022 19:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT FILL MUD GAS SEPARATOR AND CONFIRM FULL. LINE UP MP #1 ON INJECTION LINE DOWN OA AND LINE UP MANIFOLD IN CELLAR. RUN MP #1 CHARGE PUMP AND CIRCULATE ACROSS TOP OF OA. 5 BBL TO FILL OA. (54' ANNULAR VOLUME). CIRCULATE ADDITIONAL 1 BBL. BLOW DOWN CHOKE LINE TO GAS BUSTER. 4/2/2022 19:00 4/2/2022 19:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE SURFACE TO SURFACE W/ 215GPM, 170PSI, 34% FLOW OUT. 4/2/2022 19:30 4/2/2022 20:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT BLOW DOWN TOPDRIVE AND INJECTION LINE. FLOW CHECK WELL. STATIC. PREP FOR LAYING DOWN 4" DP. 4/2/2022 20:00 4/3/2022 00:00 4.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT SINGLE OOH AND LAY DOWN EXCESS 4" DP F/ 3,124' TO SURFACE. MONITOR HOLE FILL ON TT. 4/3/2022 00:00 4/3/2022 03:00 3.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT MU MULE SHOE AND RIH F/ SURFACE T/ 3,185'. MONITOR DISPLACEMENT ON TT. 4/3/2022 03:00 4/3/2022 03:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU W/ 285GPM, 265PSI, 38% FLOW OUT. CONCURRENTLY HOLD PJSM FOR SPOTTING 16.0PPG PILL AND DISPLACING TO 12.0PPG BRINE. 4/3/2022 03:30 4/3/2022 04:30 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT PUMP 20BBL 16PPG HI VIS PILL AND CHASE W/ 24BBL 9.5PPG BRINE. PU STRING T/ 3,090' AND RACK BACK STAND. DISPLACE WELL TO 12.0PPG BRINE W/ 200GPM, 270PSI SPP, 40 RPM. 16.0PPG HI VIS PILL F/ 3,185' T/ 3,090'. 4/3/2022 04:30 4/3/2022 05:15 0.7 5 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUT DOWN PUMPS AND RACK BACK STAND. BLOW DOWN TOP DRIVE. FILL PITS WITH 12.0PPG BRINE. FLOW CHECK WELL. STATIC. 4/3/2022 05:15 4/3/2022 06:30 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH AND RACK BACK 4" DP F/ 3,029' T/ 1,898'. 4/3/2022 06:30 4/3/2022 08:30 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT SINGLE OOH AND LAY DOWN EXCESS 4" DP F/ 1,898' TO SURFACE. MONITOR HOLE FILL ON TT. NOTE: ALL EXCESS 4" DP LAID DOWN. 4/3/2022 08:30 4/3/2022 10:45 2.2 5 10,636.0 10,636.0 PROD1, CASING WASH XT MU JET TOOL AND WASH STACK. SIGNIFICANT AMOUNT LCM OBSERVED. FUNCTION STACK. CONTINUE JETTING UNTIL STACK CLEAN. CONCURRENTLY CLEAN AND CLEAR RIG FLOOR. 4/3/2022 10:45 4/3/2022 13:30 2.7 5 10,636.0 10,636.0 PROD1, CASING RURD XT PULL WEARBUSHING. DRAIN STACK AND SET TEST PLUG. RU TO TEST BOP'S. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 54/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/3/2022 13:30 4/3/2022 20:00 6.5 0 10,636.0 10,636.0 PROD1, CASING BOPE XT TEST BOPE ALL TESTS 250/5,000PSI 5/5MIN. TEST ANNULAR PREVENTER 250/3500PSI, 5/5MIN. MANUAL AND SUPER CHOKES TESTED TO 2,500PSI. TEST ANNULAR PREVENTER AND 3 1/2" X 6" UPR AND 3 1/2" X 6" LPR WITH 4" AND 3 1/2" TEST JOINT. TEST CHOKE VALVES 1-15, CHOKE AND KILL MANUAL'S AND HCR'S, 4" VALVE ON KILL LINE, 2 X 4" FOSV, 4" DART VALVE, UPPER AND LOWER IBOP, BLIND/SHEAR RAMS. PERFORM KOOMEY DRAWDOWN, ACC=3050 PSI, MANIFOLD=1500PSI INITIAL. AFTER ALL FUNCTIONS, ACCUMULATOR=1800 PSI, 8 SECS TO 200 PSI WITH TWO ELECTRIC PUMPS, 58 SECS TO BUILD TO FULL SYSTEM PRESSURE WITH TWO ELECTRIC AND TWO AIR PUMPS. CPAI WITNESSED. TEST, LEL AND H2S ALARMS. AOGCC REP AUSTIN MCLEOD WAIVED WITNESS BOPE TEST 04/01/2022 @ 17:48. 4/3/2022 20:00 4/3/2022 22:00 2.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT BLOW DOWN ALL TESTING EQUIPMENT. PULL TEST PLUG. INSTALL WEARBUSHING (8.375" ID) AS PER FMC. PERFORM DERRICK INSPECTION. 4/3/2022 22:00 4/4/2022 00:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT MU MULE SHOE, FLOT SUB AND XO. RIH W/ MULE SHOE ON 4" DP F/ SURFACE T/ 1900'. 4/4/2022 00:00 4/4/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CONTINUE RIH W/ MULE SHOE ON 4" DP F/ 1900' T/ 2941'. 4/4/2022 00:30 4/4/2022 04:00 3.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION 12PPG BRINE. GRADUALLY STAGE UP FLOW RATE AND WORK PIPE W/ 175GPM, 300PSI SPP, 80RPM. STRIP OUT SIGNIFICANT AMOUNT LCM. UNABLE TO CIRCULATE @ HIGHER RATE DUE TO SHAKERS BLINDING OFF. 4/4/2022 04:00 4/4/2022 04:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUT DOWN AND BLOW DOWN TOP DRIVE. CHANGE OUT WORN SHAKER SCREENS. 4/4/2022 04:30 4/4/2022 12:00 7.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION 12PPG BRINE. GRADUALLY STAGE UP FLOW RATE AND WORK PIPE W/ 650GPM, 1085PSI SPP, 80RPM, 1-2K TQ. STRIP OUT LCM. 4/4/2022 12:00 4/4/2022 12:15 0.2 5 10,636.0 10,636.0 PROD1, CASING OWFF XT BLOW DOWN TOP DRIVE AND FLOW CHECK WELL. STATIC. 4/4/2022 12:15 4/4/2022 14:45 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TRIP OOH W/ MULESHOE ON 4" DP F/ 2941' T/ SURFACE. 4/4/2022 14:45 4/4/2022 15:15 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT CLEAN AND CLEAR RIG FLOOR. 4/4/2022 15:15 4/4/2022 18:00 2.7 5 10,636.0 10,636.0 PROD1, CASING SLPC XT SLIP AND CUT 75' OF DRILL LINE. CALIBRATE BLOCK HEIGHT, SERVICE BLOCKS. COMPLETE DERRICK INSPECTION. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 55/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/4/2022 18:00 4/4/2022 19:30 1.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT GATHER COMPONENTS FOR CLEAN OUT RUN. PU 6 3/4" TRI-CONE, BIT SUB, FLOAT SUB AND XO. 4/4/2022 19:30 4/4/2022 21:30 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ CLEAN OUT BHA F/ SURFACE T/ 2,941'. 4/4/2022 21:30 4/5/2022 00:00 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION 12PPG BRINE. GRADUALLY STAGE UP FLOW RATE AND WORK PIPE W/ 600GPM, 2950PSI SPP, 40RPM, 1-2K TQ. STRIP OUT LCM. 4/5/2022 00:00 4/5/2022 03:15 3.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION 12PPG BRINE. GRADUALLY STAGE UP FLOW RATE AND WORK PIPE W/ 600GPM, 2950PSI SPP, 40RPM, 1-2K TQ. STRIP OUT LCM. 4/5/2022 03:15 4/5/2022 05:30 2.2 5 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUT DOWN PUMPS AND FLOWCHECK WELL. STATIC. MONITOR OA PRESSURE. TIME PRESS DELTA 03:25 595 - 03:30 567 28 03:40 519 48 03:50 473 46 04:00 438 35 04:10 400 38 04:20 371 29 04:30 345 26 04:40 322 23 04:50 301 21 05:00 281 20 05:10 263 18 05:20 243 20 4/5/2022 05:30 4/5/2022 06:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION 12PPG BRINE. GRADUALLY STAGE UP FLOW RATE AND WORK PIPE W/ 600GPM, 2950PSI SPP, 40RPM, 1-2K TQ. STRIP OUT LCM. MONITOR OA PRESSURE. 4/5/2022 06:00 4/5/2022 08:15 2.2 5 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUD DOWN PUMPS AND BLOWDOWN TOP DRIVE. LINE UP OA TO CHOKE MANIFOLD. BLEED OFF OA PRESSURE F/ 200PSI T/ 0 PSI. 15 GAL RETURNED. MONITOR OA PRESSURE 4/5/2022 08:15 4/5/2022 15:00 6.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION 12PPG BRINE. GRADUALLY STAGE UP FLOW RATE CYLCE PUMPS BETWEEN 200GPM & 720GPM TO ESTABLISH OA PRESSURE TREND. WORK PIPE W/ 720GPM, 3900PSI SPP, 200GPM, 546PSI SPP, 40RPM, 1-2K TQ. STRIP OUT LCM. MONITOR OA PRESSURE. 4/5/2022 15:00 4/5/2022 15:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT BLOW DOWN TOP DRIVE AND FLOWCHECK WELL. STATIC. 4/5/2022 15:30 4/5/2022 17:15 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 6 3/4" CLEAN OUT BHA F/ 2937' T/ SURFACE. LAY DOWN BIT, BIT SUB, FLOAT SUB AND XO. 4/5/2022 17:15 4/5/2022 21:00 3.7 5 10,636.0 10,636.0 PROD1, CASING OWFF XT CLEAN AND CLEAR RIG FLOOR. MONITOR WELL ON TT. STAGE SECTION MILL TOOLS ON RIG FLOOR. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 56/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/5/2022 21:00 4/5/2022 22:45 1.7 5 10,636.0 10,636.0 PROD1, CASING BHAH XT HOLD PJSM. PU 7 5/8" SECTION MILL BHA (8 5/8" KNIFE SWEEP) AS PER YELLOWJACKET REP. KNIVES 15.43' ABOVE TAPERED MILL. THREAD LOK ALL COMPONENTS BELOW SECTION MILL. 6 3/4" SOD TAPERED MILL 4 1/4" XO SUB 2 7/8" P X 3 1/2" REG B X2 PONY COLLAR 2 7/8" REG SECTION MILL DRESSED W/ CUT OUT BLADES (8 5/8" SWEEP) 2 7/8" REG P X 3 1/2" IF BOX FLOAT SUB W/ PLUNGER FLOAT 4/5/2022 22:45 4/5/2022 23:15 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT MU TOP DRIVE. POSITION SECTION MILL AT RT. SHALLOW TEST BHA, STAGE UP FLOW RATE IN 1/2BPM INCREMENTS. KNIVES BEGAN TO OPEN AND FULLY EXTENDED @ 1.5BPM 50PSI SPP. BLEED OFF PRESSURE AND REPEAT SHALLOW TEST. KNIVES BEGAN TO OPEN AND FULLY EXTENDED @ 1BPM 45PSI SPP. BLEED OFF SPP. TAPE KNIVES. BLOW DOWN TOP DRIVE. 4/5/2022 23:15 4/6/2022 00:00 0.7 5 10,636.0 10,636.0 PROD1, CASING BHAH XT CONTINUE MU SECTION MILL BHA AND RIH F/ SURFACE T/ 329'. X9 4 3/4" SPIRAL DC'S XO 3 1/2" IF P X XT39 B 4 3/4" DRILLING JARS XT39 XO XT39 P X 3 1/2" IF B X2 4 3/4" SLICK DC'S XO 3 1/2" IF P X XT39 B X5 STANDS 4" HWDP 4/6/2022 00:00 4/6/2022 01:15 1.2 5 10,636.0 10,636.0 PROD1, CASING BHAH XT CONTINUE MU SECTION MILL BHA AND RIH F/ 329' T/ 856'. X9 4 3/4" SPIRAL DC'S XO 3 1/2" IF P X XT39 B 4 3/4" DRILLING JARS XT39 XO XT39 P X 3 1/2" IF B X2 4 3/4" SLICK DC'S XO 3 1/2" IF P X XT39 B X5 STANDS 4" HWDP 9K BELOW JARS. 4/6/2022 01:15 4/6/2022 03:15 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ SECTION MILL BHA F/ 856' T/ 3095' (3,079' SECTION MILL DEPTH) AT 90 FPM. 4/6/2022 03:15 4/6/2022 03:45 0.5 0 10,636.0 10,636.0 PROD1, CASING SFTY XT HOLD DETAILED PJSM W/ ALL PERSONNEL FOR MILLING OPERATIONS. MONITOR WELL ON TT. NOTIFY CD1 PAD OPERATOR OF UPCOMING MILLING OPERATIONS. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 57/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/6/2022 03:45 4/6/2022 04:00 0.2 5 10,636.0 10,636.0 PROD1, CASING OTHR XT PU F/ 3095' T/ 2984' (UTILIZE 5' STICK AND MARK PIPE). SECTION MILL AT 2,969'. FILL PIPE AND ESTABLISH PARAMETERS. PUW: 93K SOW: 91K ROT: 92K W/ 3K TQ OA PRESS: 6PSI 4/6/2022 04:00 4/6/2022 04:45 0.7 5 10,636.0 10,636.0 PROD1, CASING MILL XT CUT CASING AT 2,969' W/ 175GPM, 670PSI SPP, 60 RPM, 3K TQ. AFTER 4MIN OBSERVE PRESSURE DECREASE 470PSI SPP & TQ SMOOTH OUT. OA PRESSURE 6 PSI. NO CHANGE AFTER CUT. NO LOSSES. CONTINUE GRADUALLY STAGE UP FLOW RATE TO 690GPM, 3245PSI SPP, 60 RPM, 2K TQ. 4/6/2022 04:45 4/6/2022 15:15 10. 50 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 2,969' T/ 2,978' (2992' BIT DEPTH) W/ 0-2K WOB, 690GPM, 3250PSI SPP, 50-120RPM, 2- 4K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 10BBL SUPERSWEEP @ 11:00. NO INCREASE IN CUTTINGS AT SURFACE PUMP 10BBL SUPERSWEEP @ 15:15. 30% INCREASE IN CUTTINGS AT SURFACE OA PRESSURE GRADUALLY INCREASE TO 200PSI. BLEED BACK FLUID TO 55GAL DRUM. 60GAL TOTAL OVER 5 BLEED CYCLES. 4/6/2022 15:15 4/6/2022 15:45 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT DECISION TO TOH FOR LOW ROP. CIRCULATE 6X BU W/ 690GPM, 3275PSI SPP, 25RPM, 4K TQ. 4/6/2022 15:45 4/6/2022 16:15 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH F/ 2,992' T/ 2,982' (BIT DEPTH) OBSERVE 10K OVER PULL. RIH T/ 2,992' (BIT DEPTH) AND SET DOWN 6K MULTIPLE TIMES. TOH T/ 2927' (BIT DEPTH) AND PULL INTO CSG CUT W/ NO OVERPULL. CONFIRM KNIVES SHUT. 4/6/2022 16:15 4/6/2022 17:00 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT RECORD SPR'S. BLOW DOWN TOP DRIVE. FLOWCHECK WELL. STATIC. 4/6/2022 17:00 4/6/2022 19:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 7 5/8" SECTION MILL F/ 2,982' T/ 856'. HOLE TAKING CORRECT FILL. 4/6/2022 19:00 4/6/2022 20:30 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT FLOWCHECK WELL AT BHA. STATIC. TOH W/ 7 5/8" BHA F/ 856' T/ SURFACE. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 58/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/6/2022 20:30 4/6/2022 22:00 1.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT INSPECT SECTION MILL AT SURFACE. MINIMAL WEAR ON KNIVES. NO WASH ON INTERNAL PISTON. NO WEAR ON TAPERED MILL. REDRESS SECTION MILL W/ COLLAR KNIVES. ( 9 3/8" SWEEP). MU TOP DRIVE. POSITION SECTION MILL AT RT. SHALLOW TEST BHA, STAGE UP FLOW RATE IN 1/2BPM INCREMENTS. KNIVES BEGAN TO OPEN AND FULLY EXTENDED @ 1BPM 70PSI SPP. TAPE KNIVES AND BLOW DOWN TOP DRIVE. NOTE: OPEN OBSERVATION HATCHES ON FLOWLINE. ALL CLEAN. NO SWARF OBSERVED. 4/6/2022 22:00 4/7/2022 00:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ SECTION MILL BHA F/ SURFACE T/ 2280' AT 90 FPM. 4/7/2022 00:00 4/7/2022 01:00 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CONTINUE TIH W/ SECTION MILL BHA F/ 2280' T/ 2286' (2971' SECTION MILL DEPTH) AT 90 FPM. 4/7/2022 01:00 4/7/2022 01:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT MU TOP DRIVE. FILL PIPE. ESTABLISH PARAMETERS W/ 175GPM, 440PSI SPP, 80RPM, 2.5K TQ. GRADUALLY INCREASE FLOWRATE T/ 690GPM, 3230PSI SPP. REAM DOWN F/ 2971' T/ 2978'. 4/7/2022 01:30 4/7/2022 06:00 4.5 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 2,978' T/ 2,986' (3,001' BIT DEPTH) W/ 2-3K WOB, 690GPM, 3245PSI SPP, 80RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 10BBL SUPERSWEEP @ 03:15. 30% INCREASE IN CUTTINGS AT SURFACE. PUMP 10BBL SUPERSWEEP @ 05:15. 20% INCREASE IN CUTTINGS AT SURFACE. OA PRESSURE GRADUALLY INCREASE F/ 10 PSI T/ 125 PSI. CUMULATIVE VOLUME BLED OFF OA: 60 GAL 4/7/2022 06:00 4/7/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 2,986' T/ 2,994' (3,009' BIT DEPTH) W/ 4-8K WOB, 690GPM, 3325PSI SPP, 80RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 20BBL SUPERSWEEP @ 09:30. 30% INCREASE IN CUTTINGS AT SURFACE. PUMP 20BBL SUPERSWEEP @ 11:00. 50% INCREASE IN CUTTINGS AT SURFACE. OA BLEED #5 @ 07:30. 17 GAL OA BLEED #6 @ 10:58. 22 GAL CUMULATIVE VOLUME BLED OFF OA: 98 GAL Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 59/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/7/2022 12:00 4/7/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 2,994' T/ 3,002' (3,017' BIT DEPTH) W/ 4-12K WOB, 690GPM, 3325PSI SPP, 80- 120RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 20BBL SUPERSWEEP @ 12:40. 50% INCREASE IN CUTTINGS AT SURFACE. PUMP 20BBL SUPERSWEEP @ 14:00. 50% INCREASE IN CUTTINGS AT SURFACE. PUMP 20BBL SUPERSWEEP @ 16:30. 50% INCREASE IN CUTTINGS AT SURFACE. OA BLEED #7 @ 07:30. 21 GAL CUMULATIVE VOLUME BLED OFF OA: 119 GAL 4/7/2022 18:00 4/7/2022 23:15 5.2 5 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,002' T/ 3,006' (3,021' BIT DEPTH) W/ 4-12K WOB, 690GPM, 3405PSI SPP, 80- 120RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NOTE: START 20BBL SUPERSWEEP EVERY HOUR. OA PRESSURE GRADUALLY INCREASE F/ 63 PSI T/ 140 PSI. BEGIN WEIGH SWARF @ 21:00. ESTIMATE 2500LBS CUMULATIVE RECOVERED. 4/7/2022 23:15 4/8/2022 00:00 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT PERFORM CLEAN UP CYCLE DUE TO INCREASED SPP. PUMP 20BBL SUPER SWEEP AND WORK PIPE F/ 3021' T/ 3011' W/ 690GPM, 3390-3340 PSI SPP, 80RPM, 1-2K TQ. OBSERVE SIGNIFICANT AMOUNT OF FINE SWARF AT SURFACE. CONSISTENCY OF STEEL WOOL.MINIMAL FORMATION OBSERVED. 4/8/2022 00:00 4/8/2022 00:45 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CONTINUE CIRCULATE AND WORK PIPE F/ 3021' T/ 3011' W/ 690GPM, 3400 -3340 PSI SPP, 80RPM, 1-2K TQ. PUMP TWO 20BBL SWEEPS W/ 20BBL ACTIVE BETWEEN. OBSERVE SIGNIFICANT AMOUNT OF FINE SWARF AT SURFACE. MINIMAL FORMATION. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 60/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/8/2022 00:45 4/8/2022 01:00 0.2 5 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUT DOWN PUMPS AND OPEN FLOWLINE OBSERVATION HATCHES. INSPECT FLOWLINE FOR SWARF. FLOWLINE CLEAN. REINSTALL HATCHES. CONCURRENTLY GREASE WASHPIPE. NOTE: OA PRESS DECREASE F/ 177 PSI T/ 87 PSI OVER 15 MIN PERIOD. 4/8/2022 01:00 4/8/2022 06:00 5.0 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,006' T/ 3,017' (3,032' BIT DEPTH) W/ 8-12K WOB, 690GPM, 3395PSI SPP, 80RPM, 2 -3K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 20BBL SUPERSWEEP EVERY HOUR. OA BLEED #8 @ 02:20: 18 GAL CUMULATIVE VOLUME BLED OFF OA: 137 GAL METAL RECOVERD: 459 LBS CUMULATIVE RECOVERED: 2959 LBS 4/8/2022 06:00 4/8/2022 11:30 5.5 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,017' T/ 3,026' (3,041' BIT DEPTH) W/ 3-12K WOB, 690GPM, 3330PSI SPP, 80-100 RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 20BBL SUPERSWEEP EVERY HOUR. OA PRESS INCREASE F/ 30 PSI T/ 106 PSI METAL RECOVERD: 432 LBS CUMULATIVE RECOVERED: 3391 LBS 4/8/2022 11:30 4/8/2022 15:30 4.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT OBSERVE PUMP PRESSURE INCREASE F/ 3475 PSI T/ 3565 PSI OVER 5 MIN PERIOD AND BEGIN LOSING MUD. SLOW PUMPS TO 520GPM, 2140PSI SPP. PU AND START WORKING PIPE F/ 3041' T/ 3031'. STAGE UP FLOWRATE T/ 690GPM, 3165PSI SPP, 30RPM, 2-3K TQ. OBSERVE GRAVEL TO BASEBALL SIZED CUTTINGS AT SURFACE. NOTE: TOTAL MUD LOST WHILE CIRCULATING 58 BBL'S. DECREASE MW F/ 12.2 PPG T/ 12.0PPG. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 61/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/8/2022 15:30 4/8/2022 19:15 3.7 5 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,026' T/ 3,034' (3,049' BIT DEPTH) W/ 3-12K WOB, 690GPM, 3330PSI SPP, 80-100 RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NOTE: PUMP 20BBL SUPERSWEEP EVERY HOUR. OA PRESS INCREASE F/ 35 PSI T/ 51 PSI METAL RECOVERD: 535 LBS CUMULATIVE RECOVERED: 3926 LBS 4/8/2022 19:15 4/8/2022 20:30 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT OBSERVE PUMP PRESSURE INCREASE F/ 3375 PSI T/ 3420 PSI OVER 5 MIN PERIOD AND BEGIN LOSING MUD. SLOW PUMPS TO 520GPM, 2075PSI SPP. PU AND START WORKING PIPE F/ 3041' T/ 3031'. STAGE UP FLOWRATE T/ 690GPM, 3165PSI SPP, 30RPM, 2-3K TQ. NOTE: TOTAL MUD LOST WHILE CIRCULATING 8 BBL'S. 4/8/2022 20:30 4/8/2022 21:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUT DOWN PUMPS. SLACK OFF AND TAG STUMP W/ 10K. PU 20' AND RUN TAPERED MILL BACK INSIDE STUMP (NO DRAG). TAG STUMP WITH SECTION MILL AND SET DOWN 5-10K. ATTEMPT TO CLOSE KNIVES. UNSUCCESFULL. 4/8/2022 21:00 4/8/2022 22:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT ESTABLISH CIRCULATION AND WORK PIPE F/ 3041' T/ 3031'. STAGE UP FLOWRATE T/ 690GPM, 3165PSI SPP, 30RPM, 2-3K TQ. PUMP TWO 20BBL HI-VIS SWEEPS W/ 20 BBL ACTIVE MUD BETWEEN. OBSERVE SIGNIFICANT AMOUNT GRAVEL TO BASEBALL SIZED CUTTINGS AT SURFACE. 4/8/2022 22:00 4/8/2022 22:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT SHUT DOWN PUMPS. SLACK OFF AND TAG STUMP W/ 10K. PU 20' AND RUN TAPERED MILL BACK INSIDE STUMP (NO DRAG). TAG STUMP WITH SECTION MILL AND SET DOWN 5-10K. POOH F/ 3047' T/ 2,933'. NOT DRAG PULLING BHA INSIDE CASING. 4/8/2022 22:30 4/8/2022 22:45 0.2 5 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOW CHECK WELL. STATIC. BLOW DOWN TOP DRIVE. 4/8/2022 22:45 4/9/2022 00:00 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 7 5/8" SECTION MILL F/ 2,933' T/ 856'. HOLE TAKING CORRECT FILL. 4/9/2022 00:00 4/9/2022 02:00 2.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT FLOWCHECK WELL AT BHA. STATIC. TOH W/ 7 5/8" BHA F/ 856' T/ SURFACE. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 62/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/9/2022 02:00 4/9/2022 02:30 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT INSPECT SECTION MILL AT SURFACE. 7/8" WEAR GROOVE ON KNIVES. NO WASH ON INTERNAL PISTON. NO WEAR ON TAPERED MILL. (KNIVES MILLED 56' INCLUDING ONE COLLAR) REDRESS SECTION MILL W/ COLLAR KNIVES. ( 9 3/8" SWEEP). MU TOP DRIVE. POSITION SECTION MILL AT RT. SHALLOW TEST BHA, STAGE UP FLOW RATE IN 1/2BPM INCREMENTS. KNIVES BEGAN TO OPEN AND FULLY EXTENDED @ 1BPM 55PSI SPP. TAPE KNIVES AND BLOW DOWN TOP DRIVE. 4/9/2022 02:30 4/9/2022 04:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ SECTION MILL BHA F/ SURFACE T/ 856' AT 90 FPM. 4/9/2022 04:00 4/9/2022 04:30 0.5 0 10,636.0 10,636.0 PROD1, CASING SVRG XT SERVICE TOP DRIVE. 4/9/2022 04:30 4/9/2022 06:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ SECTION MILL BHA F/ SURFACE T/ 2990' AT 90 FPM. 4/9/2022 06:00 4/9/2022 07:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT FILL PIPE. STAGE UP PUMPS TO 250GPM, 590PSI SPP. ESTABLISH ROTATION 30RPM, 2-3K TQ. CONTINUE STAGE UP PUMPS TO 414GPM, 1300PSI SPP. 4/9/2022 07:00 4/9/2022 08:00 1.0 0 10,636.0 10,636.0 PROD1, CASING WASH XT WASH DOWN F/ 2990' T/ 3029' BIT DEPTH. STAGE UP FLOWRATE TO 690GPM, 3275PSI SPP. WASH DOWN F/ 3029 T/ 3049' BIT DEPTH. NOTE: NO DRAG OBSERVED ENTERING 7 5/8" STUMP. 4/9/2022 08:00 4/9/2022 08:30 0.5 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,034' T/ 3,037' (3,052' BIT DEPTH) W/ 3-12K WOB, 690GPM, 3280PSI SPP, 80 RPM, 2-4K TQ. JET FLOWLINE CONTINUALLY. NOTE: OA PRESS INCREASE F/ 12 PSI T/ 16 PSI 4/9/2022 08:30 4/9/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT OBSERVE PUMP PRESSURE INCREASE F/ 3022 PSI T/ 3104 PSI OVER 5 MIN PERIOD AND BEGIN LOSING MUD. SLOW PUMPS TO 600GPM, 2650PSI SPP. PU AND START WORKING PIPE F/ 3052' T/ 3044'. DECREASE FLOW RATE T/ 550GPM, 2275PSI SPP. NOTE: TOTAL MUD LOST WHILE CIRCULATING 40 BBL'S. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 63/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/9/2022 09:00 4/9/2022 10:30 1.5 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,037' T/ 3,039' (3,054' BIT DEPTH) W/ 3-8K WOB, 520GPM, 3280PSI SPP, 80 RPM, 2-4K TQ. JET FLOWLINE CONTINUALLY. NOTE: OA PRESS INCREASE F/ 16 PSI T/ 17 PSI OBSERVE SEEPAGE LOSSES 8 BBL/HR. 4/9/2022 10:30 4/9/2022 11:30 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT OBSERVE LOSS RATE INCREASE. PU AND START WORKING PIPE F/ 3054' T/ 3044'. DECREASE FLOW RATE T/ 300GPM, 850PSI SPP. MIX AND PUMP 20BBL 11.6+PPG 14PPB PROCORE LCM PILL. HEAL LOSES. NOTE: TOTAL MUD LOST WHILE CIRCULATING 15 BBL'S. 4/9/2022 11:30 4/10/2022 00:00 12. 50 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,039' T/ 3,071' (3,086' BIT DEPTH) W/ 8-12K WOB, 530-660GPM, 2115-3030PSI SPP, 80-120 RPM, 2-3K TQ. JET FLOWLINE CONTINUALLY. NO LOSSES NOTE: PUMP 20BBL SUPERSWEEP EVERY HOUR. OA PRESS INCREASE F/ 15 PSI T/ 62 PSI METAL RECOVERD: 712 LBS CUMULATIVE RECOVERED: 4638 LBS 4/10/2022 00:00 4/10/2022 06:30 6.5 0 10,636.0 10,636.0 PROD1, CASING MILL XT SECTION MILL 7 5/8" CSG F/ 3,071' T/ 3,089' (3,104.5' BIT DEPTH) W/ 8-12K WOB, 660GPM, 3150PSI SPP, 100-120 RPM, 2-4K TQ. JET FLOWLINE CONTINUALLY. NO LOSSES NOTE: PUMP 20BBL SUPERSWEEP EVERY HOUR. OA PRESS INCREASE F/ 62 PSI T/ 109 PSI METAL RECOVERD: 298 LBS CUMULATIVE RECOVERED: 4936 LBS 4/10/2022 06:30 4/10/2022 10:30 4.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND WORK PIPE F/ 3,103' T/ 2,990' W/ 670GPM, 3140PSI SPP, 120RPM, 2-5K TQ. PUMP SEVERAL HI VIS SWEEPS. BACKREAM OOH TO INSIDE 7 5/8" CSG CUT. NO DRAG OBSERVED. 4/10/2022 10:30 4/10/2022 11:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT OBTAIN SPR'S AND BLOWDOWN TOP DRIVE. 4/10/2022 11:00 4/10/2022 12:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT PERFORM EXTENDED FLOWCHECK. STATIC. 4/10/2022 12:00 4/10/2022 14:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 7 5/8" SECTION MILL F/ 2,969' T/ 856'. HOLE TAKING CORRECT FILL. 4/10/2022 14:00 4/10/2022 14:30 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT FLOWCHECK WELL AT BHA. STATIC. TOH W/ 7 5/8" BHA F/ 856' T/ SURFACE. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 64/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/10/2022 14:30 4/10/2022 15:30 1.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT INSPECT SECTION MILL AT SURFACE. 1" WEAR GROOVE ON 3 KNIVES. ONE KNIFE HAD BROKEN BLADE. NO WASH ON INTERNAL PISTON. NO WEAR ON TAPERED MILL. (KNIVES MILLED 55' INCLUDING TWO COLLARS). LAY DOWN SECTION MILL BHA AS PER YELLOWJACKET REP. 4/10/2022 15:30 4/10/2022 18:00 2.5 0 10,636.0 10,636.0 PROD1, CASING WASH XT PU SINGLE, MAGNET AND STACK WASHER. RIH AND JET BOP STACK W/ 900GPM, 135PSI, 10RPM, MAKE SEVERAL ROTATING PASSES. SIGNIFICANT AMOUNT SWARF RECOVERED AT SURFACE. 4/10/2022 18:00 4/10/2022 21:00 3.0 0 10,636.0 10,636.0 PROD1, CASING WASH XT PU STREAMFLO WASH TOOL (13.38" OD). DRAIN STACK AND FLUSH KILL LINE. MEASURE IN HOLE AND MARK PIPE AT EACH RAM CAVITY. POSITION TOOL AT UPR'S AND FLUSH W/ 20GPM, 50PSI SPP, 10 RPM. WORK STRING DOWN TO LPR'S. TAKE RETURNS TO CELLAR THROUGH OPEN IA. NOTE: CONTINUALLY HANGING UP AND OBSERVE OVERPULL AT EACH CAVITY. NO INCREASE IN SWARF OBSERVED AT SURFACE. 4/10/2022 21:00 4/11/2022 00:00 3.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT MU CLEAN OUT BHA AS PER YELLOWJACKET & BAKER REP. RIH F/ SURFACE T/ 931' CLEAN OUT BHA: 6 3/4" TAPERED MILL BIT SUB 4 3/4" DRILL COLLAR EXTREME MAGNET EXTREME MAGNET GRABBITZ STRING MAGNET FLOAT SUB X9 4 3/4" SPIRAL DC'S XO EXTREME MAGNET EXTREME MAGNET DRILLING JAR X2 4 3/4" SPIRAL DC'S XO X5 STD 4" HWDP 4/11/2022 00:00 4/11/2022 01:30 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CONTINUE TIH W/ 6 3/4" CLEAN OUT BHA F/ 931' T/ 2918'. HOLE GIVING CORRECT DISPLACEMENT 4/11/2022 01:30 4/11/2022 02:15 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT FILL PIPE AND RECORD DRILLING PARAMATERS. RIH F/ 2918' T/ 3083'. SET DOWN 10K. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 65/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/11/2022 02:15 4/11/2022 06:00 3.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT ESTABLISH CIRCULATION AND WORK PIPE F/ 3083' T/ 3011' W/ 690GPM, 2505PSI SPP, 30RPM, 2-3K TQ. HOLE ATTEMPTING TO PACKOFF. DECREASE FLOW RATE TO 260GPM, 675PSI SPP, 50RPM, 3K TQ. CONTINUE WORKING DOWN T/ 3,087' AND WORK PIPE. WELL UNLOADING SIGNIFICANT AMOUNT OF SWARF, FORMATION AND CEMENT. JET FLOWLINE CONTINUALLY. WELL ON SEEPAGE LOSSES. REDUCE FLOWRATE TO MITIGATE. PUMP 15BBL LCM SWEEP AND LOSSES HEAL TEMPORARILY. TOTAL LOSSES ~20BBL. PUMP HI VIS SUPERSWEEP AND OBSERVE MODERATE INCREASE IN CUTTINGS AT SURFACE. CONTINUE BACKREAM OOH INTO 7 5/8" STUMP T/ 2910'. NO DRAG OBSERVED PULLING INTO STUMP. 4/11/2022 06:00 4/11/2022 06:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT BLOWDOWN TOP DRIVE AND FLOWCHECK WELL. STATIC. RECORD SPR'S. 4/11/2022 06:30 4/11/2022 08:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 6 3/4" CLEAN OUT BHA F/ 2910' T/ 1878'. HOLE NOT TAKING CORRECT FILL. 4/11/2022 08:00 4/11/2022 08:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ 6 3/4" CLEAN OUT BHA F/ 1878' T/ 3085'. NO DRAG OBSERVED IN OPEN HOLE. 4/11/2022 08:30 4/11/2022 09:30 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU AND WORK PIPE AT 3085' W/ 215GPM, 300PSI SPP. 4/11/2022 09:30 4/11/2022 13:30 4.0 0 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH 6 3/4" CLEAN OUT BHA F/ 3085' T/ 931' W/ 214GPM, 200PSI SPP. 4/11/2022 13:30 4/11/2022 13:45 0.2 5 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOWCHECK WELL. STATIC. 4/11/2022 13:45 4/11/2022 16:30 2.7 5 10,636.0 10,636.0 PROD1, CASING BHAH XT CONTINUE POOH W/ 6 3/4" CLEAN OUT BHA F/ 931' T/ SURFACE. ALL STRING MAGNETS 100% PACKED OFF WITH SWARF. SCRAPE OFF MAGNETS INTO 5 GAL BUCKETS. 4/11/2022 16:30 4/11/2022 17:30 1.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT MU 6 3/4" CLEAN OUT BHA AND RIH F/ SURFACE T/ 931'. CONCURRENTLY FILL OA W/ 12PPG BRINE. ~3BBL TO FILL. 4/11/2022 17:30 4/11/2022 19:15 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ 6 3/4" CLEAN OUT BHA ON 4" DP F/ 931' T/ 2918'. HOLE GIVING CORRECT DISPLACEMENT. 4/11/2022 19:15 4/11/2022 19:45 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT FILL PIPE. RIH F/ 2918' T/ 3084'. SET DOWN 10K. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 66/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/11/2022 19:45 4/11/2022 21:45 2.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT ESTABLISH CIRCULATION AND WORK PIPE F/ 3084' T/ 3011' W/ 500GPM, 1490PSI SPP, 50-80RPM, 2-3K TQ. HOLE ATTEMPTING TO PACKOFF. DECREASE FLOW RATE TO 260GPM, 675PSI SPP, 50RPM, 3K TQ. CONTINUE WORKING DOWN T/ 3,087' AND WORK PIPE. WELL UNLOADING SIGNIFICANT AMOUNT OF GRAVEL SIZE FORMATION. MINIMAL SWARF OBSERVED. JET FLOWLINE CONTINUALLY. WELL ON SEEPAGE LOSSES. REDUCE FLOWRATE TO MITIGATE. TOTAL 10BBL LOST. SPOT 10BBL LCM PILL AND PUMP OOH AT 1BPM T/ 2910'. NO DRAG OBSERVED PULLING INTO STUMP. 4/11/2022 21:45 4/11/2022 22:00 0.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT STAGE UP FLOWRATE AND CIRCULATE WELL W/ 690GPM, 2520 PSI SPP. NO LOSSES. 4/11/2022 22:00 4/11/2022 22:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT PERFORM EXTENDED FLOWCHECK. WELL STATIC. 4/11/2022 22:30 4/12/2022 00:00 1.5 0 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH 6 3/4" CLEAN OUT BHA F/ 3085' T/ 2341' W/ 214GPM, 200PSI SPP. 4/12/2022 00:00 4/12/2022 02:00 2.0 0 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH 6 3/4" CLEAN OUT BHA F/ 3085' T/ 931' W/ 214GPM, 200PSI SPP. 4/12/2022 02:00 4/12/2022 02:45 0.7 5 10,636.0 10,636.0 PROD1, CASING OWFF XT PERFORM EXTENDED FLOWCHECK. WELL STATIC. BLOWDOWN TOP DRIVE. 4/12/2022 02:45 4/12/2022 06:30 3.7 5 10,636.0 10,636.0 PROD1, CASING BHAH XT CONTINUE POOH W/ 6 3/4" CLEAN OUT BHA F/ 931' T/ SURFACE. RACK BACK ALL 4" HWDP AND DC'S. ALL STRING MAGNETS 100% PACKED OFF WITH SWARF. SCRAPE OFF MAGNETS INTO 5 GAL BUCKETS. 4/12/2022 06:30 4/12/2022 09:00 2.5 0 10,636.0 10,636.0 PROD1, CASING SFTY XT CLEAN AND CLEAR RIG FLOOR OF ALL BHA. SPOT CASING EQUIPMENT ON RIG FLOOR. PERFORM DERRICK MANAGEMENT. 4/12/2022 09:00 4/12/2022 09:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT PU BOP JETTING TOOL. TIH AND JET STACK W/ 900GPM, 10 RPM, 160PSI. MAKE SEVERAL ROTATING PASSES. 4/12/2022 09:30 4/12/2022 10:30 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT RU DOYON TUBING TONGS AND HANDLING EQUIPMENT. POSITION DRIP NIPPLE AND MPD ON RIG FLOOR. 4/12/2022 10:30 4/12/2022 13:00 2.5 0 10,636.0 10,636.0 PROD1, CASING PUTB XT HOLD PJSM W/ ALL INVOVLED IN TUBING RUNNING OPERATIONS. MU PORTED MULESHOE AND RIH W/ 39JNTS 3 1/2" WEDGE 563 (TQ TO 4200 FTLBS) F/ SURFACE T/ 1228'. HOLE GIVING CORRECT DISPLACEMENT. 4/12/2022 13:00 4/12/2022 13:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RD DOYON TUBING TONGS AND CLEAR FLOOR. MU XT39 XO AND RU TO RUN 4" DP FROM DERRICK. 4/12/2022 13:30 4/12/2022 15:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH 3 1/2" TUBING STINGER ON 4" DP F/ 1228' T/ 2837'. PUW: 73K SOW: 75K Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 67/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/12/2022 15:00 4/12/2022 16:30 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT PULL DRIP NIPPLE AND INSTALL DRIP NIPPLE. MU RCD BEARING AS PER MPD HAND. 4/12/2022 16:30 4/12/2022 18:00 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT MU TOP DRIVE AND ESTABLISH CIRCULATION THROUGH MPD BYPASS LINE. STAGE UP PUMPS TO 690GPM, 1250PSI SPP. ROTATE PIPE W/ 20RPM, 1K TQ. 4/12/2022 18:00 4/12/2022 18:30 0.5 0 10,636.0 10,636.0 PROD1, CASING SVRG XT RIG SERVICE. (ST-100). 4/12/2022 18:30 4/12/2022 19:30 1.0 0 10,636.0 10,636.0 PROD1, CASING WASH XT WASH DOWN W/ 3 1/2" STINGER ON 4" DP F/ 2837' T/ 3087' (2' ABOVE 7 5/8" STUMP). W/200GPM, 315PSI SPP. MAKE SEVERAL PASSES W/ PORTED MULESHOE THROUGH UPPER 7 5/8" CUT. NO DRAG OBSERVED. 4/12/2022 19:30 4/12/2022 20:45 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION MUD W/ 690GPM, 1325PSI SPP, 20RPM, 1K TQ. OBSERVE SEEPAGE LOSSES AT 690GPM, REDUCE FLOWRATE TO 500GPM AND LOSSES STABILIZE. CONCURRENTLY HOLD DETAILED PJSM WITH ALL CREW INVOLVED W/ CEMENTING OPERATIONS. 4/12/2022 20:45 4/12/2022 21:15 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT BLOW DOWN TOP DRIVE. LAY OUT SINGLE OF 4" DP AND SPACE OUT. MU CEMENT SWIVEL AS PER BAKER REP AND SECURE W/ TUGGER. MAKE UP CMT HOSE. 4/12/2022 21:15 4/12/2022 21:45 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT ESTABLISH CIRCULATION THROUGH CMT SWIVEL STAGING UP PUMPS FROM 1 BPM TO 5BPM 410PSI. ESTABLISH ROTATION W/ 20RPM, 1K TQ. 4/12/2022 21:45 4/12/2022 23:00 1.2 5 10,636.0 10,636.0 PROD1, CASING PRTS XT BLOW DOWN LINES AND FLUSH MANIFOLD W/ 13.5PPG MUD PUSH. (6 BBL TO FILL LINES). CEMENTERS FLUSH AND PRESSURE TEST LINES 2700PSI. GOOD TEST. BLOW DOWN WATER BACK TO CEMENTERS. BEGIN BATCH 15.8PPG CMT. LINE UP MANIFOLD TO PUMP SPACER. 4/12/2022 23:00 4/12/2022 23:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CMNT XT PUMP 19BBL 13.5PPG SPACER WITH RIG PUMP FROM PILL PIT 2 STAGING UP FLOWRATE TO 4 BPM, 291PSI SPP, 20RPM, 1K TQ. (6 BBL 13.5PPG SPACER LEFT IN SURFACE LINES). LINE UP MANIFOLD TO SLB CEMENTS AND PUMP 50.3BBL 15.8PPG CMT AT 5 BPM, 190PSI, 20RPM, 1K TQ. LINE UP MANIFOLD TO RIG PUMPS AND PUMP 6BBL 13.5PPG SPACER AND 12 BBL 12.0PPG BRINE (UNDERDISPLACE BY 4 BBL). Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 68/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/12/2022 23:30 4/13/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT BREAK OFF HOSE AND LAY OUT CMT SWIVEL AS PER BAKER REP. STRING ON VACUUM. PULL OOH @ 3 MIN/STD W/ 3 1/2" STINGER ON 4" DP F/ 3082' T/ 2576'. FILL HOLE VIA KILL LINE. STRING PULLING DRY. CONCURRENTLY CEMENTERS FLUSH LINES BACK TO RIG. 4/13/2022 00:00 4/13/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT PULL OOH @ 3 MIN/STD W/ 3 1/2" STINGER ON 4" DP F/ 2576' T/ 2223' (100' ABOVE CALCULATED TOC). FILL HOLE VIA KILL LINE. STRING PULLING DRY. NOTE: SEGREGATE ALL UNWIPED 4" DP. 4/13/2022 00:30 4/13/2022 01:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT LOAD WIPER BALL AND MAKE UP TOP DRIVE. CIRCULATE X2 BU W/ 690GPM, 990PSI SPP, 50RPM, 1K TQ. NOTE: 3 BBL TO FILL STRING. MININAL CUTTINGS / SWARF OBSERVED AT SURFACE. DIVERT 40BBL CONTAMINATED SPACER. NO CMT OBSERVED AT SURFACE ( CONFIRMED W/ WEIGHT CHECKS AND PH). 4/13/2022 01:00 4/13/2022 02:00 1.0 0 10,636.0 10,636.0 PROD1, CASING SQEZ XT SHUT DOWN PUMPS AND SHUT IN MPD MANIFOLD. PERFORM HESITATION SQUEEZE IN LOT MODE TO 340PSI OVER 3 CYCLES. TOTAL INJECTED 1.6BBL'S. CLOSE FOSV AND BLOW DOWN TOP DRIVE. MONITOR PRESSURE VIA INNER ANNULUS GAUGE ON WELLHEAD. SQUEEZE #1 0.8BBL PUMPED. PRESSURE DECREASE F/ 320PSI T/ 177PSI OVER 10 MIN PERIOD SQUEEZE #2 0.5BBL PUMPED. PRESSURE DECREASE F/ 320PSI T/ 168PSI OVER 10 MIN PERIOD SQUEEZE #3 0.3BBL PUMPED. PRESSURE DECREASE F/ 340PSI T/ 184PSI OVER 10 MIN PERIOD NOTE: MONITOR OA PRESSURE WHILE INJECTING STABLE AT 19PSI. STOP DISTURBING CMT @ 01:30 4/13/2022 02:00 4/13/2022 08:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT 6HRS TO 100PSI CSA. CONCURRENTLY CLEAN CEMENT VALVES ON RIG FLOOR. PERFORM PM'S ON MP'S AND SHAKERS. MONITOR IA PRESSURE. PRESS DECREASE F/ 280PSI T/ 23PSI. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 69/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/13/2022 08:00 4/13/2022 08:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT OPEN MPD CHOKE AND BLEED OFF 23PSI IA PRESSURE. MONITOR WELL STATIC. 4/13/2022 08:30 4/13/2022 09:30 1.0 0 10,636.0 10,636.0 PROD1, CASING PULD XT PULL MPD BEARING AND DRIP NIIPPLE. INSTALL TRIP NIPPLE AS PER BEYOND MPD. 4/13/2022 09:30 4/13/2022 10:30 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 3 1/2" TUBING STINGER ON 4" DP F/ 2223' T/ 1227'. HOLE TAKING CORRECT FILL. 4/13/2022 10:30 4/13/2022 11:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RU DOYON CASING EQUPMENT AND HOLD PJSM. 4/13/2022 11:00 4/13/2022 13:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 3 1/2" TUBING STINGER F/ 1227' TO SURFACE. INSPECT PORTED MULE SHOE. ALL PORTS OPEN AND FREE OF CMT. 4/13/2022 13:00 4/13/2022 13:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG DOWN DOYON CASING EQUIPMENT AND CLEAR FLOOR. 4/13/2022 13:30 4/13/2022 15:30 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT MU 6 3/4" ROCK BIT, BIT SUB AND XO. RIH W/ 5 STANDS OF 4" HWDP AND 4" DP F/ SURFACE T/ 2167'. 4/13/2022 15:30 4/13/2022 18:30 3.0 0 10,636.0 10,636.0 PROD1, CASING WASH XT MU TOP DRIVE AND WASH DOWN F/ 2167' T/ 2574' W/ 130GPM, 350PSI SPP. NO DRAG SEEN. AT BU OBSERVE CMT / CONTAMINATED SPACER. NOTE: CONCURRENTLY FLUSH OA W/ 10BBL 12PPG BRINE. ~3BBL'S TO FILL. 4/13/2022 18:30 4/13/2022 20:00 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU W/ 215GPM, 570PSI SPP, 20RPM, 1K TQ. RACK BACK STAND AND BLOW DOWN. 4/13/2022 20:00 4/13/2022 22:00 2.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT CONTINUE WOC. PERFORM DERRICK INSPECTION, PM'S AND RIG MAINTENANCE. 4/13/2022 22:00 4/13/2022 23:00 1.0 0 10,636.0 10,636.0 PROD1, CASING COCF XT MU TOP DRIVE. ESTABLISH CIRCULATION W/ 2 BPM, 250PSI SPP AND WASH DOWN F/ 2574' T/ 2620'. SET DOWN 4-6 K WOB. PU AND CIRCULATE BU. OBSERVE SOFT CMT AT SURFACE. CONTINUE WASH / REAM DOWN F/ 2620' T/ 2637' W/ 2BPM, 250PSI SPP, 20RPM, 1K TQ. 0-5K WOB. PU AND CIRCULATE BU. OBSERVE SOFT CMT AT SURFACE. NOTE: ADAM EARL W/ AOGCC WITNESS TAG Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 70/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/13/2022 23:00 4/14/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT RACK BACK STAND AND BLOW DOWN TOP DRIVE. RU PUMP IN SUB, 1502 T, AND LO-TORQ. MU CEMENT HOSE AND FLUSH LINES. CLOSE ANNULAR PREVENTER AND PRESS TEST CMT PLUG IN LOT MODE. CHECK ALL SURFACE EQUIPMENT FOR LEAKS. 1.5BBL PUMPED. 0.5BBL RETURNED. STKS PRESS DELTA 035- 2165130 4315150 641297 848068 10 526 46 12 563 37 14 586 23 16 608 22 CLOSE LO-TORQ AND MONITOR PRESS VIA IA TIME PRESS 0538 1436 2378 3342 4318 5299 NOTE: ADAM EARL W/ AOGCC WITNESS PRESS TEST Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 71/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/14/2022 00:00 4/14/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT OPEN ANNULAR PREVENTER AND CIRCULATE STRING VOLUME THROUGH CEMENT HOSE. CLOSE ANNULAR PREVENTER AND RE ATTEMPT PRESS TEST CMT PLUG IN LOT MODE. CHECK ALL SURFACE EQUIPMENT FOR LEAKS. 1.5BBL PUMPED. 0.5BBL RETURNED. STKS PRESS DELTA 038- 2162124 4312150 6418106 851799 10 564 47 12 603 39 14 629 26 15 631 - CLOT LO-TORQ AND MONITOR PRESS VIA IA TIME PRESS 0573 1447 2397 3366 4341 5322 NOTE: ADAM EARL W/ AOGCC WITNESS PRESS TEST 4/14/2022 00:30 4/14/2022 01:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT BLOW DOWN CMT LINE AND RIG DOWN TESTING EQUIPMENT. FLOW CHECK WELL 4/14/2022 01:00 4/14/2022 03:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 6 3/4" CLEAN OUT BHA. F/ 2541' T/ SURFACE. HOLE TAKING CORRECT FILL. 4/14/2022 03:00 4/14/2022 07:00 4.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT CLEAN AND CLEAR RIG FLOOR. MU BOP JETTING TOOL AND JET STACK. PERFORM PM'S AND HOUSEKEEPING. COMPLETE DERRICK AND TOP DRIVE INSPECTION. SPOT 7 5/8" STORM PACKER ON RIG FLOOR. 4/14/2022 07:00 4/14/2022 10:00 3.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH W/ 3 STANDS 4 3/4" DC'S, 5 STANDS 4" HWDP. MU BHI TST III 7 5/8" RETRIEVABLE PACKER. RIH AND SET 7 5/8" PACKER AT 210' AS PER BHI. TOH AND LAY DOWN RUNNING TOOL. NOTE: 20K BELOW PACKER. 4/14/2022 10:00 4/14/2022 10:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PRESS TEST 7 5/8" TST III RETRIEVABLE PACKER 1500PSI, 15 MIN. GOOD TEST. 4/14/2022 10:30 4/14/2022 11:30 1.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT DRAIN BOP'S. PULL WEARBUSHING AS PER FMC. FLUSH STACK. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 72/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/14/2022 11:30 4/14/2022 16:30 5.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT HOLD PJSM. RU AND OPEN ALL RAM DOOR AND INSPECT CAVITIES / RAM BLOCKS. ALL CAVITIES CLEAN. NO INDICATION OF SWARF / METAL SHAVINGS OR EXCESS WEAR. CLOSE ALL DOORS. 4/14/2022 16:30 4/14/2022 17:00 0.5 0 10,636.0 10,636.0 PROD1, CASING BOPE XT SET TEST PLUG AND FLUSH STACK. RU TO TEST BOP'S. 4/14/2022 17:00 4/14/2022 23:30 6.5 0 10,636.0 10,636.0 PROD1, CASING BOPE XT TEST BOPE ALL TESTS 250/5,000PSI 5/5MIN. TEST ANNULAR PREVENTER 250/3500PSI, 5/5MIN. MANUAL AND SUPER CHOKES TESTED TO 2,500PSI. TEST ANNULAR PREVENTER AND 3 1/2" X 6" UPR AND 3 1/2" X 6" LPR WITH 4" AND 3 1/2" TEST JOINT. TEST CHOKE VALVES 1-15, CHOKE AND KILL MANUAL'S AND HCR'S, 4" VALVE ON KILL LINE, 2 X 4" FOSV, 4" DART VALVE, UPPER AND LOWER IBOP, BLIND/SHEAR RAMS. PERFORM KOOMEY DRAWDOWN, ACC=3050 PSI, MANIFOLD=1500PSI INITIAL. AFTER ALL FUNCTIONS, ACCUMULATOR=1800 PSI, 8 SECS TO 200 PSI WITH TWO ELECTRIC PUMPS, 58 SECS TO BUILD TO FULL SYSTEM PRESSURE WITH TWO ELECTRIC AND TWO AIR PUMPS. CPAI WITNESSED. TEST, LEL AND H2S ALARMS. AOGCC REP ADAM EARL WAIVED WITNESS BOPE TEST 04/12/2022 @ 21:00. 4/14/2022 23:30 4/15/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT BLOW DOWN ALL TESTING EQUIPMENT. PULL TEST PLUG. INSTALL WEARBUSHING (8.375" ID) AS PER FMC. NOTE: CONFIRM OA AND IA LINED UP TO READ PRESSURE ON MD TOTCO. 4/15/2022 00:00 4/15/2022 01:15 1.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT CONTINUE R/D TESTING EQUIPMENT AND FLUSH LINES. CLEAN AND CLEAR RIG FLOOR. 4/15/2022 01:15 4/15/2022 04:15 3.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT HOLD PJSM. MU 7 5/8" TST III RETRIEVABLE PACKER RT. RIH 210' AND ENGAGE PACKER W/ 12 TURNS. CONFIRM NO PRESSURE. TOOH AND LAY DOWN PACKER. CONTINUE TOH W/ 5 STANDS 4" HWDP AND 3 STANDS 4 3/4" DC'S. 4/15/2022 04:15 4/15/2022 04:45 0.5 0 10,636.0 10,636.0 PROD1, CASING PULD XT CLEAN AND CLEAR RIG FLOOR. SEND DOWN SEND DOWN STORM PACKER RT AND SECTION MILL. 4/15/2022 04:45 4/15/2022 07:00 2.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT MU 6 3/4" ROCK BIT, BIT SUB AND XO. RIH W/ 5 STANDS OF 4" HWDP AND 4" DP F/ SURFACE T/ 2548'. 4/15/2022 07:00 4/15/2022 08:30 1.5 0 10,636.0 10,636.0 PROD1, CASING WASH XT MU TOP DRIVE AND WASH DOWN F/ 2548' T/ 2700'. W/ 1.5BPM, 230 PSI SPP. 4/15/2022 08:30 4/15/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BOTTOMS UP W/ 300GPM, 878PSI SPP. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 73/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/15/2022 09:00 4/15/2022 09:30 0.5 0 10,636.0 10,636.0 PROD1, CASING WASH XT WASH DOWN F/ 2700' T/ 2790'. W/ 1.5BPM, 230 PSI SPP. TAG HARD CMT AT 2790' W/ 12K WOB. NOTE: AOGCC REP ADAM EARL WITNESSED TAG. 4/15/2022 09:30 4/15/2022 10:00 0.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT CLEAN OUT CEMENT F/ 2790' T/ 2820' W/ 1-3K WOB, 500GPM, 2160PSI SPP, 30RPM, 2K TQ. CIRCULATE HOLE CLEAN. 4/15/2022 10:00 4/15/2022 11:45 1.7 5 10,636.0 10,636.0 PROD1, CASING RURD XT RACK BACK STAND AND BLOW DOWN TOP DRIVE. RU PUMP IN SUB, 1502 T, AND LO-TORQ. MU CEMENT HOSE AND FLUSH LINES. CLOSE UPR AND PRESS TEST CMT PLUG IN LOT MODE. PRESSURE BREAK OVER AT 997PSI. CHECK ALL SURFACE EQUIPMENT FOR LEAKS. 2.2BBL PUMPED. 0.5BBL RETURNED. NOTE: ADAM EARL W/ AOGCC WITNESS PRESS TEST 4/15/2022 11:45 4/15/2022 12:00 0.2 5 10,636.0 10,636.0 PROD1, CASING WASH XT WASH DOWN AND TAG CMT @ 2820' W/ 12K WOB. 1.5BPM, 230 PSI SPP. NOTE: AOGCC REP ADAM EARL WITNESSED TAG. 4/15/2022 12:00 4/15/2022 14:30 2.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT CLEAN OUT CEMENT F/ 2820' T/ 2984' W/ 0-1K WOB, 500GPM, 2280PSI SPP, 30RPM, 2K TQ. CIRCULATE HOLE CLEAN. 4/15/2022 14:30 4/15/2022 18:15 3.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION MUD. PREP FOR INJECTIVITY TEST. 4/15/2022 18:15 4/15/2022 18:45 0.5 0 10,636.0 10,636.0 PROD1, CASING OTHR XT SPACE OUT AND CLOSE UPR. PERFORM INJECTIVITY TEST AT 0.5BPM. OBSERVE PRESSURE BREAK OVER AT 600 PSI, 11STKS. CONTINUE INJECTING AT 0.5BPM AND SHUT DOWN PUMPS AT 975PSI SPP (3.6 BBL PUMPED TOTAL). PRESSURE QUICKLY DROP TO 675PSI. MONITOR FOR 10 MINUTES. PRESSURE DECREASE TO 555PSI. 4/15/2022 18:45 4/15/2022 21:15 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT DISPLACE WELL TO NEW 12.0PPG BRINE W/ 300GPM, 950PSI SPP, 20RPM, 1K TQ. TIH AND RETAG TOC 2984' W/ 8K. 4/15/2022 21:15 4/16/2022 00:00 2.7 5 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH W/ 6 3/4" CLEAN OUT ASSEMBLY F/ 2979' T/ 1910' W/ 200GPM, 520PSI SPP 4/16/2022 00:00 4/16/2022 02:30 2.5 0 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH W/ 6 3/4" CLEAN OUT ASSEMBLY F/ 1910' T/ 854'' W/ 200GPM, 520PSI SPP 4/16/2022 02:30 4/16/2022 03:00 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 6 3/4" CLEAN OUT BHA F/ 854' T/ SURFACE. LAY DOWN BIT, BIT SUB AND XO. 4/16/2022 03:00 4/16/2022 05:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT HOLD PJSM. RU DOYON CSG CREW. MU PORTED MULESHOE AND RIH W/ 13 STANDS 3 1/2" WEDGE 563 (TQ TO 4200 FTLBS) F/ SURFACE T/ 1228'. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 74/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/16/2022 05:00 4/16/2022 07:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RD TUBING TONGS. TIH 3 1/2" TUBING STINGER ON 4" DP F/ 1228' T/ 2931'. 4/16/2022 07:00 4/16/2022 08:00 1.0 0 10,636.0 10,636.0 PROD1, CASING WASH XT MU TOP DRIVE. BREAK CIRCULATION AND WASH DOWN F/ 2931' T/ 2984'. TAG TOC. CIRCULATE BU W/ 215GPM, 264PSI SPP, 10RPM, 1K TQ. 4/16/2022 08:00 4/16/2022 09:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT RACK BACK STAND. PU 4" DP SINGLE, 15' PUP AND 5' PUP. MU BHI CEMENT SWIVEL AND SPACE OUT. MULESHOE DEPTH 2982' (2' OFF BTM). RU CEMENT HOSE. ESTABLISH CIRCULATION W/ 1BPM, 175PSI SPP, 20RPM, 1K TQ. 4/16/2022 09:00 4/16/2022 12:00 3.0 0 10,636.0 10,636.0 PROD1, CASING WAIT XT BLOW DOWN CEMENT LINE. WAIT ON CEMENTERS. 4/16/2022 12:00 4/16/2022 13:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT SPOT AND RIG UP SCHLUMBERGER CEMENTERS. BREAK CIRCULATION THROUGH CEMENT LINE. 4/16/2022 13:00 4/16/2022 13:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT HOLD PJSM W/ ALL INVOLVED IN CMT OPERATIONS. FLUSH LINES AND PRESS TEST CEMENT 2500PSI. GOOD TEST. 4/16/2022 13:30 4/16/2022 14:30 1.0 0 10,636.0 10,636.0 PROD1, CASING CMNT XT BATCH UP AND PUMP 15.8BBL 13.5PPG SPACER W/ 3 BPM, 240PSI, 20RPM, 1K TQ. LOAD WIPER BALL AND BATCH UP 15.7PPG CMT. PUMP 35BBL 15.7PPG CMT AT 4 BPM, 200PSI, 20RPM, 1K TQ. BATCH UP AND PUMP 5.1BBL 13.5PPG SPACER AND 13 BBL 12.0PPG BRINE AT 5 BPM, 200PSI, 20RPM, 1K TQ. (UNDERDISPLACE BY 4 BBL). FULL RETURNS. 4/16/2022 14:30 4/16/2022 15:45 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT BREAK OFF HOSE AND LAY OUT CMT SWIVEL AND PUP JOINTS. STRING ON VACUUM. PULL OOH @ 20 FPM W/ 3 1/2" STINGER ON 4" DP F/ 2982' T/ 2111'. LAST 4 STANDS BEGIN TO PULL WET. CONCURRENTLY CEMENTERS FLUSH LINES BACK TO RIG. 4/16/2022 15:45 4/16/2022 16:00 0.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT MAKE UP TOP DRIVE. CIRCULATE X2 BU W/ 500GPM, 427PSI SPP, 20RPM, 1K TQ. OBSERVE TRACE CONTAMINATED SPACER AT BU. NO CMT OBSERVED AT SURFACE. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 75/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/16/2022 16:00 4/16/2022 17:30 1.5 0 10,636.0 10,636.0 PROD1, CASING SQEZ XT MU FOSV AND CLOSE UPR AND ANNULAR PREVENTER AND PERFORM HESITATION SQUEEZE IN LOT MODE MONITORING IA PRESSURE 1ST SQUEEZE 1.5 BBL PUMPED. 641 PSI. BLED DOWN TO 436PSI OVER 7 MIN PERIOD 2ND SQUEEZE 0.3 BBL PUMPED. 644 PSI. BLED DOWN TO 430PSI OVER 10 MIN PERIOD 3RD SQUEEZE 0.3 BBL PUMPED. 652 PSI. BLED DOWN TO 429PSI OVER 15 MIN PERIOD 4TH SQUEEZE 0.3 BBL PUMPED (2.5BBL TOTAL). 663 PSI. BLED DOWN TO 376PSI OVER 30 MIN PERIOD BLEED DOWN IA PRESSURE TO 170PSI. 0.7BBL BLED BACK. CEMENT IN PLACE 17:30 04/16/2022 4/16/2022 17:30 4/17/2022 00:00 6.5 0 10,636.0 10,636.0 PROD1, CASING WOC XT CLOSE FOSV AND BLOWDOWN TOP DRIVE. WAIT ON CEMENT TO ACHIEVE 1000PSI UCA. CONCURRENTLY CLEAN CEMENT VALVES ON RIG FLOOR. PERFORM PM'S ON MP'S AND SHAKERS. PROCESS FLOWBACK FLUID IN TIGER TANK FOR DISPOSAL. MONITOR IA PRESSURE. PRESS DECREASE F/ 170PSI T/ 21PSI. 4/17/2022 00:00 4/17/2022 18:00 18. 00 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT TO ACHIEVE 1000PSI UCA. CONCURRENTLY CLEAN CEMENT VALVES ON RIG FLOOR. PERFORM PM'S ON MP'S AND SHAKERS. PROCESS FLOWBACK FLUID IN TIGER TANK FOR DISPOSAL. MONITOR IA PRESSURE. PRESS DECREASE F/ 21PSI T/ 2PSI. 4/17/2022 18:00 4/17/2022 18:45 0.7 5 10,636.0 10,636.0 PROD1, CASING OTHR XT CONFIRM NO PRESSURE ON IA. OPEN ANNULAR PREVENTER AND UPR'S. BLOW DOWN KILL LINE. 4/17/2022 18:45 4/17/2022 19:45 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 3 1/2" TUBING STINGER ON 4" DP F/ 2111' T/ 1228'. HOLE TAKING CORRECT FILL. 4/17/2022 19:45 4/17/2022 21:15 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RU TUBING TONGS. TOH RACKING BACK 3 1/2" TUBING STINGER. LAY OUT MULE SHOE. NOTE: STRING PULLED WET. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 76/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/17/2022 21:15 4/17/2022 22:45 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RD TUBING TONGS. MU WASH TOOL AND JET BOP'S. SIGNIFICANT AMOUNT OF POLYMER FLUSHED ACROSS SHAKERS. RU HOSE AND FILL OA TAKING RETURNS TO CELLAR BOX. ~2BBL TO FILL. CONCURRENTLY BREAK OFF 5' DP PUP FROM CMT SWIVEL ASSEMBLY. 4/17/2022 22:45 4/18/2022 00:00 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT MU 6 3/4" ROCK BIT, BIT SUB, FLOAT SUB (W/ PLUNGER FLOAT) AND XO. RIH W/ 5 STANDS OF 4" HWDP AND 4" DP F/ SURFACE T/ 1799'. 4/18/2022 00:00 4/18/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CONTINUE RIH W/ 6 3/4" CLEAN OUT BHA F/ 1799' T/ 2169'. 4/18/2022 00:30 4/18/2022 01:15 0.7 5 10,636.0 10,636.0 PROD1, CASING WASH XT MU TOP DRIVE AND FILL PIPE. ESTABLISH CIRCULATION W/ 2 BPM, 230PSI SPP AND WASH DOWN F/ 2169' T/ 2330'. SET DOWN 3-5 K WOB. PU AND CIRCULATE BU. SIGNIFICANT AMOUNT OF BURNT UP POLYMER BLINDING OFF SHAKERS. 4/18/2022 01:15 4/18/2022 02:30 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION MUD. STAGE UP FLOWRATE AND WORK PIPE. TREAT MUD FOR CMT CONTAMINATION AND BRING ON VOLUME. 4/18/2022 02:30 4/18/2022 03:00 0.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT DRILL CEMENT F/ 2330' T/ 2390' WITH 0 -2K WOB, 215GPM, 580PSI SPP, 50RPM, 1-2K TQ. PU AND STOP ROTARY. WASH DOWN AND TAG HARD CEMENT @ 2330' W/ 11K. UNABLE TO WASH DOWN. 4/18/2022 03:00 4/18/2022 04:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT PU AND CIRCULATE BU. SHAKERS BLINDING OFF DUE TO POLYMER. JET FLOWLINE. GRADUALLY STAGE UP FLOWRATE TO 5 BPM AND CIRCULATE HOLE CLEAN. 4/18/2022 04:00 4/18/2022 04:30 0.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT DRILL/REAM CEMENT F/ 2390' T/ 2484' WITH 0K WOB, 600GPM, 2390PSI SPP, 50RPM, 1-2K TQ. 4/18/2022 04:30 4/18/2022 04:45 0.2 5 10,636.0 10,636.0 PROD1, CASING WASH XT PU OFF BOTTOM AND DECREASE FLOWRATE TO 215 GPM, 530PSI SPP. WASH DOWN F/ 2484' T/ 2547'. NO WOB OBSERVED. 4/18/2022 04:45 4/18/2022 05:00 0.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU AND WORK PIPE W/ 215GPM, 530PSI, 30RPM, 1K TQ. BROOH F / 2547' T / 2518' OBSERVE SOFT CEMENT AT SURFACE. 4/18/2022 05:00 4/18/2022 09:15 4.2 5 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. CIRC W/ 1 BPM, 112 PSI 4/18/2022 09:15 4/18/2022 09:45 0.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F / 2518' TO 2573' W/ 1.5 BPM, 186 PSI, 3 K WOB. IT APPEARS THAT WE ARE WASHING THRU SOFT CEMENT. 4/18/2022 09:45 4/18/2022 10:00 0.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU AND WORK PIPE W/ 500 GPM, 2069 PSI, 20RPM, 1K TQ. OBSERVE SOFT CEMENT CUTTINGS AT SURFACE. DECISION MADE TO CONT. W.O.C. 4/18/2022 10:00 4/18/2022 14:00 4.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 77/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/18/2022 14:00 4/18/2022 14:30 0.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F / 2573' T / 2585 W/ 1.5 BPM, 210 PSI, 5 K WOB. AT 2585' WOB INCREASE TO 10 K. CONT. TO WASH DOWN TO 2595'. INCREASE FLOW RATE TO 500 GPM AND ROTATE AT 20 RPM. W&R F/2595' T / 2600' WITH NO WOB. CEMENT APPEARS TO BE GETTING HARDER BUT NOT FULLY CURED. 4/18/2022 14:30 4/18/2022 15:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU AND WORK PIPE W/ 500 GPM, 2200 PSI, 20RPM, 1K TQ. CEMENT CUTTINGS ARE HARDER AND MORE CONSISTENT BUT NOT FULLY CURED. DECISION MADE TO CONT. W.O.C. 4/18/2022 15:00 4/18/2022 20:00 5.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S 4/18/2022 20:00 4/18/2022 20:30 0.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F/ 2544' T/ 2600' W/ 2BPM, 220PSI SPP. TAG TOC 2600'. SET DOWN 12K AND HOLD 1 MINUTE. WEIGHT DID NOT DROP OFF. ESTABLISH ROTATION AND DRILL/REAM CEMENT F/ 2600' T/ 2620' WITH 2-3K WOB, 2BPM, 240PSI SPP, 30RPM, 1-2K TQ, 300 FPH ROP. 4/18/2022 20:30 4/18/2022 21:45 1.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU AND WORK PIPE W/ 400 GPM, 1520 PSI, 30RPM, 1K TQ. OBSERVE SOFT CMT AT SURFACE. DECISION MADE TO CONT. W.O.C. 4/18/2022 21:45 4/19/2022 00:00 2.2 5 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S. 4/19/2022 00:00 4/19/2022 03:30 3.5 0 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S. 4/19/2022 03:30 4/19/2022 04:30 1.0 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F/ 2544' T/ 2600' W/ 2BPM, 220PSI SPP. TAG TOC 2620'. SET DOWN 12K AND HOLD 2 MINUTE. WEIGHT DID NOT DROP OFF. INCREASE FLOW RATE 400 GPM SET DOWN 15K WOB. WEIGHT DROP TO 10K OVER 5MIN. ESTABLISH ROTATION AND DRILL/REAM CEMENT F/ 2620' T/ 2700' WITH 8-10K WOB, 2BPM, 240PSI SPP, 30RPM, 2-3K TQ, 150 FPH ROP. CBU. MEDIUM/FIRM CMT AT SURFACE. 4/19/2022 04:30 4/19/2022 05:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE BU AND WORK PIPE W/ 400 GPM, 1520 PSI, 30RPM, 1K TQ. OBSERVE MEDIUM/FIRM CMT AT SURFACE. DECISION MADE TO CONT. W.O.C. 4/19/2022 05:00 4/19/2022 10:00 5.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S. 4/19/2022 10:00 4/19/2022 11:00 1.0 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F/ 2639' T/ 2700' W/ 1.5BPM, 220PSI SPP. TAG TOC 2700'. SET DOWN 30K AND HOLD. ESTABLISH ROTATION AND DRILL/REAM CEMENT F/ 2700' T/ 2736' WITH 10-12K WOB, 500GPM, 2150PSI SPP, 30RPM, 2-3K TQ. CBU. MEDIUM/FIRM CMT AT SURFACE. 4/19/2022 11:00 4/19/2022 15:00 4.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 78/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/19/2022 15:00 4/19/2022 16:00 1.0 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F/ 2700' T/ 2736' W/ 1.5BPM, 220PSI SPP. TAG TOC 2736'. SET DOWN 20K AND HOLD. ESTABLISH ROTATION AND DRILL/REAM CEMENT F/ 2736' T/ 2770' WITH 10-12K WOB, 500GPM, 2120PSI SPP, 30RPM, 2-3K TQ. CBU. MEDIUM/FIRM CMT AT SURFACE. 4/19/2022 16:00 4/19/2022 17:00 1.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT W.O.C. SIMOPS HOUSE KEEPING AND PM'S. DECISION MADE TO CLEAN OUT CMT PLUG #2. 4/19/2022 17:00 4/19/2022 19:30 2.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT DRILL/REAM CEMENT F/ 2770' T/ 2944' WITH 10-12K WOB, 500GPM, 2470PSI SPP, 20RPM, 2-3K TQ. AT 2944' WOB DECREASE TO 0 AND TQ STABILIZE. CONTINUE REAM DOWN T/ 2984' WITH NO WOB. PU AND STOP ROTATION. WASH DOWN F/ 2984' T/ 2991' W/ 500GPM, 2527PSI SPP, 0-1K WOB. PU OFF BOTTOM AND REDUCE PUMPS TO 84GPM, 230PSI. WASH DOWN AND TAG TOC 2991'. SET 12K DOWN AND HOLD. 4/19/2022 19:30 4/19/2022 22:00 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE HOLE CLEAN AND CONDITION MUD W/ 600GPM, 3450PSI SPP, 20 RPM, 1K TQ. NOTE: OPEN OA TO CHOKE MANIFOLD AT 20:00. PRESS DECREASE F/ 240PSI T/ 27PSI. OA PRESS CONTINUE INCREASE F/ 27PS T/ 245PSI OVER 2HR PERIOD. 4/19/2022 22:00 4/19/2022 22:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT FLOWCHECK WELL. STATIC. 4/19/2022 22:30 4/20/2022 00:00 1.5 0 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH W/ 6 3/4" CLEAN OUT ASSEMBLY F/ 2991' T/ 2114' W/ 200GPM, 520PSI SPP. 4/20/2022 00:00 4/20/2022 02:15 2.2 5 10,636.0 10,636.0 PROD1, CASING PMPO XT PUMP OOH W/ 6 3/4" CLEAN OUT ASSEMBLY F/ 2114' T/ 454' W/ 200GPM, 520PSI SPP. 4/20/2022 02:15 4/20/2022 02:45 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOH W/ 6 3/4" CLEAN OUT BHA F/ 454' T/ SURFACE. LAY DOWN BIT, BIT SUB, FLOAT SUB AND XO. 4/20/2022 02:45 4/20/2022 04:00 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT HOLD PJSM. RU DOYON CSG CREW. MU OPEN ENDED MULESHOE AND RIH W/ 13 STANDS 3 1/2" WEDGE 563 (TQ TO 4000 FTLBS) F/ SURFACE T/ 1203'. 4/20/2022 04:00 4/20/2022 05:15 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RD TUBING TONGS. TIH 3 1/2" TUBING STINGER ON 4" DP F/ 1228' T/ 2991'. 4/20/2022 05:15 4/20/2022 07:00 1.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE AND CONDITION MUD W/ 300GPM, 489PSI SPP, 30RPM, 1.5K TQ. CHANGE SUCTION SCREENS ON BOTH MUD PUMPS. 4/20/2022 07:00 4/20/2022 14:00 7.0 0 10,636.0 10,636.0 PROD1, CASING OTHR XT PU T/ 2902' AND BLOWDOWN TOP DRIVE. TRANSFER FLUID AND CLEAN PITS. PERFORM HOUSEKEEPING AND PM'S CONCURRENTLY TOP OFF OA W/ 1BBL Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 79/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/20/2022 14:00 4/20/2022 14:45 0.7 5 10,636.0 10,636.0 PROD1, CASING WASH XT MU TOP DRIVE AND WASH DOWN F/ 2902' T/ 2984' W/ 1.5BPM, 200PSI SPP, 20RPM, 1K TQ. TAG CMT PLUG W/ 1- 2K. WASH DOWN T/ 2991'. CONFIRM SPACE OUT AND LAY OUT SINGLE OF 4" DP AND PU 5' AND 15' 4" DP PUPS. MU CMT SWIVEL AND SPACE OUT STRING. MULE SHOE AT 2991'. 4/20/2022 14:45 4/20/2022 15:30 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT DISPLACE WELL F/ 12.0PPG NABR T/ 10.0PPG KCL W/ 210GPM, 290PSI SPP, 20RPM, 1K TQ. 4/20/2022 15:30 4/20/2022 17:00 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT SPOT AND RIG UP SCHLUMBERGER CEMENTERS. BREAK CIRCULATION THROUGH CEMENT LINE. 4/20/2022 17:00 4/20/2022 17:15 0.2 5 10,636.0 10,636.0 PROD1, CASING PRTS XT HOLD PJSM W/ ALL INVOLVED IN CMT OPERATIONS. FLUSH LINES AND PRESS TEST CEMENT 2500PSI. GOOD TEST. 4/20/2022 17:15 4/20/2022 18:30 1.2 5 10,636.0 10,636.0 PROD1, CASING CMNT XT BATCH UP AND PUMP 31BBL 13.5PPG SPACER W/ 3.5 BPM, 140PSI, 20RPM, 1K TQ. LOAD WIPER BALL AND BATCH UP 16.8PPG CMT. PUMP 35BBL 16.8PPG CMT AT 3.5 BPM, 70PSI, 20RPM, 1K TQ. BATCH UP AND PUMP 10BBL 13.5PPG SPACER AND 8 BBL 10.0PPG BRINE AT 4 BPM, 410PSI, 20RPM, 1K TQ. (UNDERDISPLACE BY 3 BBL). FULL RETURNS. 4/20/2022 18:30 4/20/2022 20:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT BREAK OFF CMT HOSE AND LAY OUT CMT SWIVEL AND PUP JOINTS. STRING ON VACUUM. PULL OOH 10 STANDS @ 20 FPM W/ 3 1/2" STINGER ON 4" DP F/ 2991' T/ 2019'. ALL STANDS PULL DRY. CEMENT IN PLACE 20:00 04/20/22. (31.4 HRS TO REACH 1000psi UCA) 4/20/2022 20:00 4/20/2022 20:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT MAKE UP TOP DRIVE. CIRCULATE X2 BU W/ 500GPM, 427PSI SPP, 20RPM, 1K TQ. DIVERT 32BBL SPACER/INTERFACE TO ROCKWASH AT BU. BLOW DOWN TOP DRIVE. NOTE: 1.4BBL TO FILL PIPE 4/20/2022 20:30 4/21/2022 00:00 3.5 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT TO ACHIEVE 1000PSI UCA. CONCURRENTLY CLEAN CEMENT VALVES ON RIG FLOOR. PERFORM PM'S ON MP'S AND SHAKERS. 4/21/2022 00:00 4/21/2022 18:00 18. 00 10,636.0 10,636.0 PROD1, CASING WOC T WAIT ON CEMENT. CONCURRENTLY CLEAN RIG FLOOR. PERFORM PM'S AND HOUSEKEEPING. CHANGE OUT SHAKER MOTORS ON #3. CHANGE OUT BEARINGS AND DRAG CHAIN SPROCKETS. PERFORM DERRICK INSPECTION Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 80/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/21/2022 18:00 4/21/2022 20:30 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP T TOH W/ 3 1/2" TUBING STINGER ON 4" DP F/ 2019' T/ 1203'. HOLE TAKING CORRECT FILL. RU TUBING TONGS. TOH RACKING BACK 3 1/2" TUBING STINGER. LAY OUT MULE SHOE. NOTE: STRING PULLED DRY. 4/21/2022 20:30 4/21/2022 23:00 2.5 0 10,636.0 10,636.0 PROD1, CASING OTHR T PERFORM DERRICK MANAGMENT. LAY OUT 3 STANDS 4 3/4" COLLARS AND JAR STAND. 4/21/2022 23:00 4/22/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP T MU 6 3/4" ROCK BIT, BIT SUB, FLOAT SUB (W/ PLUNGER FLOAT) AND XO. RIH W/ 5 STANDS OF 4" HWDP AND 4" DP F/ SURFACE T/ 2072'. 4/22/2022 00:00 4/22/2022 03:30 3.5 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT. CONCURRENTLY CLEAN RIG FLOOR. PERFORM PM'S AND HOUSEKEEPING. 4/22/2022 03:30 4/22/2022 10:30 7.0 0 10,636.0 10,636.0 PROD1, CASING COCF XT WASH DOWN F/ 2072' T/ 2242' W/ 2BPM, 65PSI SPP. TAG TOC 2242'. SET DOWN 12K AND HOLD 1 MINUTE. WEIGHT DID NOT DROP OFF. PU AND STAGE UP PUMPS TO 400GPM, 1280PSI SPP. CONTINUE WASHING DOWN F/ 2242' T/ 2294' SET DOWN 20K AND HOLD 2 MINUTES ESTABLISH ROTATION AND DRILL/REAM CEMENT F/ 2294' T/ 2869' WITH 15-20K WOB, 500GPM, 2105PSI SPP, 80RPM, 3-4K TQ, 50-200 FPH ROP. AT 09:00 HRS OA PRESSURE INCREASING DUE TO TEMPERATURE. BLEED OFF .25 BBL TO CELLAR AND DECREASE PRESSURE FROM 257 PSI TO 50 PSI. 4/22/2022 10:30 4/22/2022 12:00 1.5 0 10,636.0 10,636.0 PROD1, CASING COCF XT TAG TOC AT 2869' W/ 20K WITNESS BY AOGCC LOU LAUBESTIN / RACK 1 STD BACK T/ 2830' RIG UP TEST CEMENT 4/22/2022 12:00 4/22/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PURGE ALL AIR OUT OF TESTING LINES AND EQUIP 4/22/2022 12:30 4/22/2022 15:30 3.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT SHUT UPPER RAMS AND ATTEMPT TO PRESSURE TEST CEMENT PLUG #3 TO 1500 PSI. PRESSURE UP TO 1800 PSI AND SHUT IN TO MONITOR PRESSURE FOR 1 HR. PRESSURE DECREASE TO 1400 PSI. PRESSURE LOSS IS 6.6 PSI PER MIN. BLEED PRESSURE DOWN TO 512 PSI AND SHUT IN FOR 10 MIN. PRESSURE DECREASE TO 448 PSI. PRESSURE LOSS IS 6.4 PSI PER MIN. BLEED PRESSURE DOWN TO 0. PUMPED TOTAL 1.9 BBLS. RETURNED 1 BBL DURING BLEED OFF'S. TEST FAILED. AOGCC WITNESS 4/22/2022 15:30 4/22/2022 17:30 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT DECISION MADE TO TRIP OUT HOLE F/ 2869' TO SURFACE. L/D CLEAN OUT BHA. MONITOR WELL ON TRIP TANK NOTE TOP OFF OA@ 19:15 HRS 0.5 BBLS TO FILL Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 81/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/22/2022 17:30 4/22/2022 21:30 4.0 0 10,636.0 10,636.0 PROD1, CASING WAIT XT WAIT ON TEST PACKER/ RIG UP MUD PUMP ON INJECTION LINE FOR TOPPING OFF OA. FIND XO'S FOR MAKING UP TEST PACKER CLEAN AND CLEAR RIG FLOOR 4/22/2022 21:30 4/22/2022 23:30 2.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT CLOSE BLIND RAMS AND PERFORM CASING TEST. PRESSURE UP TO 763 PSI AFTER 40 MIN. PRESSURE DECREASE TO 570 PSI. PRESSURE LOSS IS 4.8 PSI PER MIN. TEST FAILED. BLEED PRESSURE TO ZERO AND GAIN 1 BBL FLUID ON BLEED BACK. 4/22/2022 23:30 4/23/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING WAIT XT CONTINUE TO WAIT ON TEST PACKER, HOUSEKEEPING WHILE MONITORING WELL. 4/23/2022 00:00 4/23/2022 02:00 2.0 0 10,636.0 10,636.0 PROD1, CASING WAIT XT CONTINUE TO WAIT ON TEST PACKER, HOUSEKEEPING WHILE MONITORING WELL. PACKER ARRIVED AT RIG@ 2 AM 4/23/2022 02:00 4/23/2022 04:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT PJSM OD/ID AND STRAP 7 5/8' BAKER PACKER, P/U MULE SHOE , 5 STANDS 4" HEAVY WEIGHT DRILL PIPE ,7 5/8" BAKER PACKER AND RIH TO 180' 4/23/2022 04:00 4/23/2022 04:45 0.7 5 10,636.0 10,636.0 PROD1, CASING PRTS XT PRESSURE TEST @ 180' TO 2000 PSI FOR 30 MIN ON CHART. GOOD TEST. ALL INDICATIONS THAT SURFACE LINES AND EQUIPMENT IS GOOD. 4/23/2022 04:45 4/23/2022 06:00 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RELEASE PACKER AS PER BAKER REP. TOOH L/D DOWN 7 5/8" BAKER TEST PACKER RACK HWDP IN DERRICK, 4/23/2022 06:00 4/23/2022 09:30 3.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT M/U PACKER AND RIH F/ SURFACE T/ 2,823' MD, MONITORING DISPLACEMENT VIA TRIP TANK. S/O WT= 78K, P/U WT= 80K 4/23/2022 09:30 4/23/2022 12:00 2.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT SET TEST PACKER, SET DOWN 30K CONFIRMING SET AS PER BAKER REP / PRESURE UP DOWN DP T/ 1,550 PSI PRESURE DROPPED T/ 1,350 IN 23 MIN, PRESURE BACK UP T/ 1,560 AND WITHIN 23 MIN BLED BACK T/ 1,400, BLED OFF T/ PITS (1.9 BBLS PUMPED AND BLED BACK), SHUT IN UPPER RAMS AND TEST F/ PACKER T/ SURFACE W/ 1,602 PSI F/ 30 MIN 44 PSI BLEED DOWN, BLED OFF T/ PITS (1.6 BBLS PUMPED AND BLED BACK), 4/23/2022 12:00 4/23/2022 13:00 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT LINE UP T/ PUMP DOWN DP T/ 1,550 PSI BUMPING UP EVERY 15 MIN, FINAL PSI 1,625 (1.3 BBLS PUMPED) 4/23/2022 13:00 4/23/2022 15:00 2.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT HOLD PRESSURE ON CEMENT DOWN DRILL PIPE WHILE WAITING ON ORDERS, STARTING PSI= 1,625, FINAL PSI= 1,052, BLEED OFF T/ MUD PITS (1.3 BBLS BLEED BACK Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 82/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/23/2022 15:00 4/23/2022 16:00 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT RIG UP AND PRESSURE UP OA T/ 100 PSI AND SHUT IN, THEN PRESSURE UP DOWN DRILL PIPE AGAIN T/ 1,500 PSI JUST TO ENSURE NO COMMUNICATION BETWEEN, NON OBSERVED / UNSEAT PACKER AS PER BAKER REP 4/23/2022 16:00 4/23/2022 16:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT BLEED OA TO 0, BLOW DOWN TOP DRIVE, BLOW DOWN INJECTION LINE, GET HOLE FILL LINED UP, PREP FOR POOH 4/23/2022 16:30 4/23/2022 19:00 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH W/ TEST PACKER F/ 2,823' MD T/ SURFACE, MONITORING DISPLACEMENT ON TRIP TANK 4/23/2022 19:00 4/23/2022 19:45 0.7 5 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR, M/U MULE SHOE AND X/O 4/23/2022 19:45 4/23/2022 21:30 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ SURFACE T/ 2,867' MD, MONITORING DISPLACEMENT VIA TRIP TANK. S/O WT= 79K, P/U WT= 80K 4/23/2022 21:30 4/23/2022 23:00 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRC. AND RECIP. F/ 2,867' MD T/ 2,837' MD @ 500 GPM, 839 PSI, 52% F/O, 30 RPM, 1.5K TQ. TOTAL STKS PUMPED= 7,360 (748 BBLS 4/23/2022 23:00 4/24/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CONT. TO CIRC. AND RECIP. F/ 2,867' MD T/ 2,837' MD, DISPLACE WELL F/ 10 PPG BRINE T/ 9.5 PPG VIS LCM BRINE @ 500 GPM, 615 PSI, 51% F/O, 30 RPM, 1.5K TQ. TOTAL STKS PUMPED= 3,920 (398 BBLS) 4/24/2022 00:00 4/24/2022 00:15 0.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,867' MD T/ 2,842' MD, R/U TO TEST CEMENT 4/24/2022 00:15 4/24/2022 01:15 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PRESSURE TEST CEMENT DOWN DP AND KILL LINE T/ 1,730 PSI, AFTER 30 MIN PRESSURE BLED T/ 1,644 PSI. PUMPED 2.4 BBLS, BLED 2.4 BBLS BACK TO TRIP TANK 4/24/2022 01:15 4/24/2022 02:15 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PRESSURE TEST CEMENT DOWN DP AND KILL LINE T/ 1,769 PSI, AFTER 30 MIN PRESSURE BLED T/ 1,726 PSI. PUMPED 2.3 BBLS, BLED 2.3 BBLS BACK TO TRIP TANK 4/24/2022 02:15 4/24/2022 02:30 0.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT B/D TOP DRIVE, KILL LINE 4/24/2022 02:30 4/24/2022 03:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRC. S/S @ 500 GPM, 555 PSI, 48% F/O, TOTAL STKS PUMPED= 1,721 (175 BBLS 4/24/2022 03:00 4/24/2022 03:45 0.7 5 10,636.0 10,636.0 PROD1, CASING PRTS XT PRESSURE TEST CEMENT DOWN DP AND KILL LINE T/ 1,759 PSI, AFTER 30 MIN PRESSURE BLED T/ 1749 PSI. PUMPED 1.6 BBLS, BLED 1.6 BBLS BACK TO TRIP TANK 4/24/2022 03:45 4/24/2022 04:00 0.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT B/D TOP DRIVE, KILL LINE 4/24/2022 04:00 4/24/2022 05:30 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TOOH FROM 2842'' TO MULE SHOE ASSY 4/24/2022 05:30 4/24/2022 10:00 4.5 0 10,636.0 10,636.0 PROD1, CASING WAIT XT DISCUSS PLAN FORWARD OPTIONS FROM TOWN. SIMOPS - GREASE CHOKE MANIFOLD AND IBOP, MP2'S, SERVICE ST-100, SERVICE TOP DRIVE AND DRAW WORKS, HOUSEKEEPING Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 83/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/24/2022 10:00 4/24/2022 11:15 1.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT M/U 6-3/4" CLEAN OUT ASSEMBLY (BIT, BIT SUB. XO) RIH TO 2,827' 4/24/2022 11:15 4/24/2022 11:30 0.2 5 10,636.0 10,636.0 PROD1, CASING RURD XT R/U FOR PRESSURE TESTING 4/24/2022 11:30 4/24/2022 12:30 1.0 0 10,636.0 10,636.0 PROD1, CASING WAIT XT WAIT FOR AOGCC REP TO ARRIVE ON LOCATION. 4/24/2022 12:30 4/24/2022 13:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRC B/U W/500 GPM, 1770 PSI 4/24/2022 13:00 4/24/2022 14:00 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT SHUT IN UPPER PIPE RAMS. PRESSURE TEST CEMENT PLUG #3. PRESSURE UP ON DRILL STRING AND MONITOR PRESSURE ON IA GAUGE AND CHART FOR 30 MIN. INITIAL 1651 PSI, FINAL 1584 PSI. 67 PSI LOSS IN 30 MIN. PUMPED 2.2 BBLS, RETURN 2.2 BBLS ON BLEED OFF. GOOD TEST. AOGCC LOU LAUBENSTEIN WITNESS TEST. 4/24/2022 14:00 4/24/2022 16:30 2.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT PREP FOR DISPLACEMENT AND WAIT ON 9.5 PPG LSND TO BE MOBILIZED TO RIG. 4/24/2022 16:30 4/24/2022 17:00 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT PICK UP STAND AND RIH T/ 2,869' MD F/ 2,827' MD 4/24/2022 17:00 4/24/2022 17:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT BREAK CIRC, PUMP 20 BBLS SPACER @ 300 GPM, 1,215 PSI, 30 RPM, 1.5K TQ, CHASE WITH 9.5 PPG LSND, 400 GPM, 1,890 PSI, 30 RPM, 1.5K TQ, WHILE RECIP F/ 2,869' MD T/ 2,829' MD (2,519 TOT STKS) 4/24/2022 17:30 4/24/2022 18:30 1.0 0 10,636.0 10,636.0 PROD1, CASING CLEN XT BLOW DOWN TOP DRIVE, FILL TRIP TANK W/ 9.5 PPG LSND, OWFF 4/24/2022 18:30 4/24/2022 20:15 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,829' MD T/ SURFACE, MONITORING HOLE FILL VIA TRIP TANK 4/24/2022 20:15 4/24/2022 20:45 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U BAKER SCRAPER ASSEMBLY PER BAKER REP 4/24/2022 20:45 4/24/2022 23:00 2.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ SURFACE T/ 2,836' MD, MONITORING DISPLACEMENT VIA TRIP TANK. S/O WT= 81K, P/U WT= 86K 4/24/2022 23:00 4/24/2022 23:15 0.2 5 10,636.0 10,636.0 PROD1, CASING WASH XT WASH DOWN F/ 2,836' MD T/ 2,869' MD @ 2 BPM, 137 PSI, 21% F/O, S/O WT= 81K. TAG W/ 10K WOB @ 2,869' MD. P/U T/ 2,867' MD 4/24/2022 23:15 4/25/2022 00:00 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT RECIP. AND SCRAPE F/ 2,867' MD T/ 2,847' MD @ 500 GPM, 2,963 PSI, 46% F/O, 10 RPM, 1.5K TQ. TOTAL STKS PUMPED= 5,089 (517 BBLS) 4/25/2022 00:00 4/25/2022 02:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/2847' MD TO SURFACE MONITORING HOLE FILL VIA TRIP TANK L/D SCRAPPER ASSY AS PER BAKER 4/25/2022 02:00 4/25/2022 02:45 0.7 5 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U CIBP AS PER BAKER REP. 4/25/2022 02:45 4/25/2022 04:45 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ SURFACE TO 2860' MD MONITORING DISPLACEMENT VIA TRIP TANK S/O 75K P/U 80K 4/25/2022 04:45 4/25/2022 05:00 0.2 5 10,636.0 10,636.0 PROD1, CASING MPSP XT SET 7 5/8" CIBP @ 2856' PRESS UP TO 1000 PSI VERIFY CIBP IS SET 4/25/2022 05:00 4/25/2022 05:15 0.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRCULATE SURFACE TO SURFACE GETTING AIR OUT MUD SYSTEM Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 84/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/25/2022 05:15 4/25/2022 06:30 1.2 5 10,636.0 10,636.0 PROD1, CASING PRTS XT TEST CIBP TO 1734 PSI FOR 30 MIN ON CHART. PUMPED 1.7 BBLS, 1.7 BBLS BLED BACK T/ TRIP TANK, RE- TAG PLUG W/ 10K / BLOW DOWN TOP DRIVE AND KILL 4/25/2022 06:30 4/25/2022 08:00 1.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT POOH F/ 2,856' MD T/ SURFACE MONITORING DISPLACEMENT ON TRIP TANK / BREAK DOWN BRIDGE PLUG RUNNING TOOL AS PER BAKER REP 4/25/2022 08:00 4/25/2022 08:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR 4/25/2022 08:30 4/25/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG UP TUBING RUNNING EQUIPMENT AS PER DDI CSG REP 4/25/2022 09:00 4/25/2022 11:30 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ 3.5'' TUBING AND 4'' DP F/ SURFACE T/ 2,843' MD MONITORING DISPLACEMENT ON TRIP TANK 4/25/2022 11:30 4/25/2022 12:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT PICK UP CEMENT SWIVEL AND PUP JOINT FOR SPACE OUT T/ 2,856' MD 4/25/2022 12:00 4/25/2022 14:00 2.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG UP CEMENT LINE, TEE, AND LOW TORQUE VALVES ON SWIVEL, SLB CEMENTERS RIG UP ALL TOOLS AND EQUIPMENT 4/25/2022 14:00 4/25/2022 15:30 1.5 0 10,636.0 10,636.0 PROD1, CASING CMNT XT ATTEMPT T/ PT CEMENT LINES, CEMENT SWIVEL LEAKED, GREASED SWIVEL AND TRIED AGAIN STILL LEAKING, BREAK DOWN SWIVEL, XO'S, AND PUP JOINTS, RIG UP PUP JOINT, SIDE ENTRY SUB, AND TIW VALVE 4/25/2022 15:30 4/25/2022 16:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRC AND RECIP PIPE WHILE WARMING WELL BORE, 500 GPM, 720 PSI, 45% OF, F/ 2,856' MD T/ 2,816' MD, PU= 72K, SO= 73K 4/25/2022 16:00 4/25/2022 17:30 1.5 0 10,636.0 10,636.0 PROD1, CASING CMNT XT PT LINES T/ 2,500 PSI, PUMP 23 BBLS 13.5 PPG MUD PUSH, 20 BBLS 16.8 PPG CLASS G CEMENT, 7 BBLS 13.5 PPG MUD PUSH, CHASED W/ 14.3 BBLS 9.5 PPG LSND, ALL PUMPED @ 2 - 3 BPM BY SLB CEMENTERS, RECIP PIPE 10' DURING ENTIRE JOB F/ 2,856' MD T/ 2,846 4/25/2022 17:30 4/25/2022 18:00 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT LAY DOWN PUP JTS, SIDE ENTRY SUB, TIW VALVE, AND WORKING SINGLE, POOH RACKING BACK F/ 2,856' MD T/ 2,578' MD, PU= 70K 4/25/2022 18:00 4/25/2022 19:45 1.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRC., CLEAN UP HOLE @ 500 GPM, 451 PSI, 47% F/O, 10 RPM, 1K TQ. TOTAL STKS PUMPED= 6,803 (691 BBLS). POOH F/ 2,578' MD T/ 2,530' MD, B/D TOP DRIVE OBSERVED MUD PUSH AND 6 BBLS GREEN CEMENT AT SURFACE ON B/U CIP = 19:45 HRS 4/25/2022 19:45 4/25/2022 20:30 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH W/ 4" DP F/ 2,530' MD T/ 1,203' MD, MONITORING HOLE FILL VIA TRIP TANK. 4/25/2022 20:30 4/25/2022 21:30 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH W/ 3.5" F/ 1,203' MD T/ SURFACE, MONITORING HOLE FILL VIA TRIP TANK. Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 85/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/25/2022 21:30 4/25/2022 22:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR 4/25/2022 22:00 4/25/2022 22:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT PULL WEAR RING PER FMC REP 4/25/2022 22:30 4/25/2022 23:30 1.0 0 10,636.0 10,636.0 PROD1, CASING WASH XT WASH BOP STACK 4/25/2022 23:30 4/26/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/U TESTING EQUIPMENT 4/26/2022 00:00 4/26/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/U TESTING EQUIPMENT 4/26/2022 00:30 4/26/2022 05:00 4.5 0 10,636.0 10,636.0 PROD1, CASING BOPE XT TEST BOPE w/3-1/2" & 4" TEST JOINTS T/ 250 LOW 5,000 PSI HIGH FOR 5 CHARTED MIN. W/ EXCEPTION OF ANNULAR 250 LOW / 3,500 PSI HIGH. UPR'S/LPR;S 3-1/2"X6" VBR'S. CHOKE MANIFOLD. CHOKE & KILL MANUALS & HCR'S, 4" VALVE ON KILL LINE, 4" FOSV, 4" DART VALVE, UPPER & LOWER IBOP; BLIND/ SHEAR RAMS; PERFORM KOOMEY DRAWDOWN, ACC = 3050 PSI. MANIF. = 1500 PSI. ACC = 1825 PSI AFTER ALL FUNCTIONS ON BOTTLES, 59 SEC FOR 200 PSI. BUILD W/ 2 ELEC. PUMPS, 8 SEC T/ BUILD FULL SYS. PRESSURE W/ 2 ELEC. & 2 AIR PUMPS, CLOSING TIMES ANNULAR = 23 SEC. UPR = 18 SEC. BLIND / SHEARS = 16 SEC. LPR = 16 SEC. CHOKE HCR = 2 SEC. KILL HCR = 2 SEC; TEST PVT GAIN/LOSS AND FLOW OUT ALARMS, TEST LEL AND H2S ALARMS; AOGCC REP LOU LAUBENSTEIN WAIVED WITNESS @ 12:00 HRS on 04/25/22 4/26/2022 05:00 4/26/2022 06:30 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT INSTALL WEAR BUSHING AS PER FMC R/D & B/D TESTING EQUIP 4/26/2022 06:30 4/26/2022 13:00 6.5 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT, SERVICE RIG, HOUSE KEEPING, MP2'S, PU AND RACK BACK 3 STDS 5'' HWDP, TOP OFF OA (0.5 BBL) BLOW DOWN LINES, EMPTY MUD PITS AND CLEAN FOR 9.5 PPG PRO CORE BRINE 4/26/2022 13:00 4/26/2022 15:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT MU BIT, BIT SUB, AND XO, RIH W/ 4'' DP F/ SURFACE T/ 2,573' PU=82K SO=80K / WASH DOWN F/ 2,450' MD @ 66 GPM, 120 PSI 4/26/2022 15:00 4/26/2022 15:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CBU WHILE WAITING ON AOGCC REP LOU LAUBENSTEIN, 200 GPM, 520 PSI, 32% FO, (1,087 TOT. STKS) SHUT DOWN PUMPS AND TAG CEMENT W/ 10K @ 2,575' MD WITNESSED BY LOU LAUBENSTEIN 4/26/2022 15:30 4/26/2022 17:30 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT BD/TD, POOH F/ 2,575' MD T/ SURFACE / BREAK OUT AND LAY DOWN XO, BIT SUB, AND BIT 4/26/2022 17:30 4/26/2022 18:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR, MOBLIZE CASING CUTTER BHA TO RIG FLOOR AS PER BAKER REP Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 86/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/26/2022 18:00 4/26/2022 19:00 1.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U CSG CUTTER BHA PER BAKER HUGHES REP. FUNCTION TEST CUTTER AT SURFACE (GOOD) 4/26/2022 19:00 4/26/2022 21:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH F/ SURFACE T/ 2,550' MD, MONITORING DISPLACEMENT VIA TRIP TANK. S/O WT= 80K, P/U WT= 81K 4/26/2022 21:00 4/26/2022 21:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CPBO XT OBTAIN PARAMETERS PER BAKER HUGHES REP. S/O WT= 80K, P/U WT= 81K, ROT WT= 81K, 90 RPM, 2K TQ. MAKE CUT @ 190 GPM, 691 PSI, 31% F/O, 90 RPM, 2.5K TQ. 2:38 MIN IN OBSERVE CUT W/ 261 PSI PRESSURE DROP T/ 430 PSI 4/26/2022 21:30 4/26/2022 22:15 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT ATTEMPT TO ESTABLISH COMMUNICATION W/ OA. PUMP W/2 BPM WITH MAX WORKING PSI OF 290 PSI. MAKE SEVERAL ATTEMPTS WITH NO RETURNS UP OA 4/26/2022 22:15 4/26/2022 22:30 0.2 5 10,636.0 10,636.0 PROD1, CASING CPBO XT POOH F/ 2,550' MD T/ 2,400' MD. OBTAIN PARAMETERS PER BAKER HUGHES REP. S/O WT= 77K, P/U WT= 77K, ROT WT= 78K, 90 RPM, 2K TQ. MAKE CUT @ 190 GPM, 669 PSI, 33% F/O, 90 RPM, 2.5K TQ. 2:28 MIN IN OBSERVE CUT W/ 517 PSI PRESSURE DROP T/ 150 PSI 4/26/2022 22:30 4/26/2022 23:15 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT AFTER CUT, OBSERVE 6 BBL GAIN IN PITS WHILE CIRCULATING. SHUT DOWN PUMPS, ROTARY, SPACE OUT AND SHUT ANNULAR AND LINE UP TO GAS BUSTER. CIRC. THROUGH GAS BUSTER @ 3 BPM, 336 PSI. TOTAL STKS PUMPED= 1,006 (102 BBLS) 4/26/2022 23:15 4/27/2022 00:00 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT CONFIRM ZERO PRESSURE AND OPEN ANNULAR. CIRC. @ 3 BPM, 318 PSI, 25% F/O. TOTAL STKS PUMPED= 1,169 (118 BBLS) 4/27/2022 00:00 4/27/2022 01:00 1.0 0 10,636.0 10,636.0 PROD1, CASING OWFF XT OWFF- STATIC 4/27/2022 01:00 4/27/2022 01:15 0.2 5 10,636.0 10,636.0 PROD1, CASING CPBO XT CONFIRM NO/GO @ CUT 4/27/2022 01:15 4/27/2022 01:30 0.2 5 10,636.0 10,636.0 PROD1, CASING CIRC XT DROP BALL, PRESSURE UP TO 2,500 PSI TO SHEAR AND OPEN BAKER CIRC SUB 4/27/2022 01:30 4/27/2022 02:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT FLUID MANAGEMENT IN PITS, GET READY TO DISPLACE TO LCM BRINE 4/27/2022 02:00 4/27/2022 02:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT DISPLACE WELL F/ 9.5 PPG LSND TO 9.5 PPG LCM BRINE @ 400 GPM, 509 PSI, 44% F/O. TOTAL STKS PUMPED= 2,140 (217 BBLS) 4/27/2022 02:30 4/27/2022 03:00 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT OWFF- STATIC 4/27/2022 03:00 4/27/2022 05:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,400' MD T/ SURFACE, MONITORING HOLE FILL VIA TRIP TANK 4/27/2022 05:00 4/27/2022 06:00 1.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT L/D CSG CUTTER BHA PER BAKER HUGHES REP AND WASH OUT BOPE STACK 4/27/2022 06:00 4/27/2022 06:30 0.5 0 10,636.0 10,636.0 PROD1, CASING WWSP XT PULL WEAR RING AND SET TEST PLUG PER FMC REP Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 87/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/27/2022 06:30 4/27/2022 08:30 2.0 0 10,636.0 10,636.0 PROD1, CASING BOPE XT CHANGE OUT UPPER RAMS F/ 3.5'' X 6'' VBR'S T/ 7 5/8'' SOLID BODY 4/27/2022 08:30 4/27/2022 10:00 1.5 0 10,636.0 10,636.0 PROD1, CASING BOPE XT INSTALL 7 5/8'' TEST JOINT, RIG UP AND PURGE ALL AIR FROM LINES, TEST ANNULAR 250 PSI LOW 3,500 PSI HIGH, AND UPPER RAMS 250 PSI LOW AND 5,000 PSI HIGH, ALL CHARTED 4/27/2022 10:00 4/27/2022 10:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT BLOW DOWN AND RIG DOWN ALL TEST EQUIPMENT, PULL TEST PLUG 4/27/2022 10:30 4/27/2022 12:00 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT PJSM, CHANGE OUT SAVER SUB F/ XT -39 T/ 4.5 IF 4/27/2022 12:00 4/27/2022 13:30 1.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT CONT. CHANGE OUT SAVER SUB F/ XT -39 T/ 4.5 IF 4/27/2022 13:30 4/27/2022 16:00 2.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG UP CASING PULLING TOOLS AND EQUIPMENT AS PER DDI CASING REP. 4/27/2022 16:00 4/27/2022 17:00 1.0 0 10,636.0 10,636.0 PROD1, CASING WWSP XT RIG UP PACK OFF RUNNING TOOL AND INSTALL ON JOINT, RIH HOLE ENGAGE PACK OFF, BOLDS, PULL PACK OFF W/ 2K AS PER FMC REP 4/27/2022 17:00 4/27/2022 18:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG DOWN RUNNING TOOL AND JOINT, CHANGE OUT ELEVATORS, PU AND MU 7 5/8'' LANDING JOINT, RIH AND MAKEUP TO HANGER AS PER FMC REP 4/27/2022 18:00 4/27/2022 18:15 0.2 5 10,636.0 10,636.0 PROD1, CASING TRIP XT PULL HANGER OFF LANDING RING AND POOH F/ 2,400' MD T/ 2,396'. OBSERVE BREAK OVER @ 112K 4/27/2022 18:15 4/27/2022 19:00 0.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT SHUT IN ANNULAR AND LINE UP TO TIGER TANK. CHECK LINE UPS AND PREP IN MUD PITS FOR DISPLACEMENT 4/27/2022 19:00 4/27/2022 20:45 1.7 5 10,636.0 10,636.0 PROD1, CASING CIRC XT DISPLACE BACKSIDE OUT TO TIGER TANK @ 3 BPM, 27 PSI. TOTAL STKS PUMPED= 3,317 (337 BBLS) 4/27/2022 20:45 4/27/2022 21:15 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT OWFF, B/D TIGER TANK, B/D CHOKE MANIFOLD, PUMP OUT STATIC 4/27/2022 21:15 4/27/2022 23:00 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,396' MD T/ 2,340' MD. L/D LANDING JT, HANGER, 5' PUP, AND 10' PUP 4/27/2022 23:00 4/27/2022 23:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT DUE TO U-TUBE, CIRC S/S @ 500 GPM, 106 PSI, 46% F/O. TOTAL STKS PUMPED=4484 (456 4/27/2022 23:30 4/28/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,340' MD T/ 2298' MD L/D 7 5/8" TXP CSG, MONITORING HOLE FILL VIA TRIP TANK 4/28/2022 00:00 4/28/2022 05:00 5.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2298' MD t/T SURFACE L/D 7 5/8" TXP CSG, MONITORING HOLE FILL VIA TRIP TANK 4/28/2022 05:00 4/28/2022 05:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/D 7 5/8" CASING HANDLING EQUIP CLEAN AND CLEAR RIG FLOOR 4/28/2022 05:30 4/28/2022 07:30 2.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT CHANGE OUT SAVER SUB TO XT-39 4/28/2022 07:30 4/28/2022 08:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT INSTALL WEAR RING AS PER FMC REP (12.5'' ID) 4/28/2022 08:00 4/28/2022 09:30 1.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT BRING BAKER SPEAR ASSY. BHA TO RIG FLOOR AS PER BAKER REP 4/28/2022 09:30 4/28/2022 11:00 1.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT MU SPEAR ASSY AS PER BAKER REP F/ SURFACE T/ 333' MD Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 88/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/28/2022 11:00 4/28/2022 12:00 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ 4'' DRILL PIPE F/ 333' T/ 2,037' MD, SO= 82K 4/28/2022 12:00 4/28/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CONT. RIH W/ 4'' DRILL PIPE F/ 2,037' T/ 2,390' SO 82K 4/28/2022 12:30 4/28/2022 12:45 0.2 5 10,636.0 10,636.0 PROD1, CASING FISH XT AT 2,390' COLLECT BASE LINE T&D DATA. BRK CIRC, 2 BPM 64 PSI, 4 BPM 102 PSI, 10 BPM 440 PSI. PU 81K / SO 82K WITHOUT PUMPS. CONT. IN HOLE F/ 2,390' AND ENGAGE TOP OF FISH WITH SPEAR ASSY 2-5 K WOB F/ 2,400' T/ 2,410' 4/28/2022 12:45 4/28/2022 13:15 0.5 0 10,636.0 10,636.0 PROD1, CASING SVRG XT SERVICE TOP DRIVE AND PERFORM PRE-JARRING DERRICK INSPECTION 4/28/2022 13:15 4/28/2022 14:00 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT P/U WORKING SINGLE. WORK STUCK CASING. JAR 8 x 70K TO 85K OVER PULL TO 200K,120K OVER, CREEPING UP CHASE 60' UP BROKE LOSE DRAGGING 10K PULLED UP 2,488' / PUMP 1 BPM TO OVERCOME SWABBING 4/28/2022 14:00 4/28/2022 14:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,488' MD T/ 2,392' MD, PU= 83K / PUMP 1 BPM TO OVERCOME SWABBING 4/28/2022 14:30 4/28/2022 16:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CBU X2 STKS STAGING UP T/ 10 BPM, 400 PSI, 46% FO (6,304 TOT. STKS) 4/28/2022 16:00 4/28/2022 16:30 0.5 0 10,636.0 10,636.0 PROD1, CASING OWFF XT BLOW DOWN TOP DRIVE / OWFF (STATIC 4/28/2022 16:30 4/28/2022 18:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,392' MD T/ 483' MD PU= 56K, MONITOR WELL VIA TRIP TANK 4/28/2022 18:00 4/28/2022 20:30 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT MONITOR WELL, M/U FOSV CROSSOVER, POOH W/ SPEAR BHA AND 7 5/8'' FISH, L/D 4JTS 7-5/8 CSG, ATTEMPT TO RELEASE SPEAR FROM FISH PER BAKER REP 4/28/2022 20:30 4/28/2022 22:00 1.5 0 10,636.0 10,636.0 PROD1, CASING SVRG XT DRAIN BOP STACK, CLOSE BLINDS, INSTALL 3.5X6 VBRS, SIMOP:CLEAN AND CLEAR BAKER TOOLS OFF OF RIG FLOOR, MOBILIZE 12.25"CLEANOUT BHA TO FLOOR 4/28/2022 22:00 4/28/2022 22:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PULL WEAR RING AND SET TEST PLUG PER FMC REP 4/28/2022 22:30 4/28/2022 23:00 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PULL WEAR RING AND SET TEST PLUG PER FMC REP 4/28/2022 23:00 4/28/2022 23:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT PERFORM SHELL TEST, 250/5000PSI, NO LEAKS 4/28/2022 23:30 4/29/2022 00:00 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT TEST 3.5", 4" TEST JT W/ 3.5"X6"UPR, 250/5000PSI 5-MIN CHARTED 4/29/2022 00:00 4/29/2022 00:30 0.5 0 10,636.0 10,636.0 PROD1, CASING PRTS XT TEST 3.5", 4" TEST JT W/ 3.5"X6"UPR, 250/5000PSI 5-MIN CHARTED 4/29/2022 00:30 4/29/2022 01:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT R/D TEST EQUIPMENT CLEAN AND CLEAR RIG FLOOR 4/29/2022 01:00 4/29/2022 01:30 0.5 0 10,636.0 10,636.0 PROD1, CASING WWWH XT FMC PULL TEST PLUG AND INSTALL 12.50" WEARBUSHING 4/29/2022 01:30 4/29/2022 02:00 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U 12 1/4" BIT AND BHA 4/29/2022 02:00 4/29/2022 02:30 0.5 0 10,636.0 10,636.0 PROD1, CASING BHAH XT M/U 12 1/4" BIT AND BHA 4/29/2022 02:30 4/29/2022 04:00 1.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH T/ 2350' Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 89/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/29/2022 04:00 4/29/2022 05:30 1.5 0 10,636.0 10,636.0 PROD1, CASING WASH XT FILL PIPE WASH DOWN FROM 2350' CIRCULATE SURFACE TO SURFACE, MUD THICK AND COLD. 4/29/2022 05:30 4/29/2022 06:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT PUMPS OFF TO RECONFIGURE SHAKERS 4/29/2022 06:00 4/29/2022 06:30 0.5 0 10,636.0 10,636.0 PROD1, CASING WASH XT WASH DOWN F/ 2,434' MD T/ 2,550' 600 GPM, 1,100 PSI, 50% FO, 45 RPM, 2K TQ, TAG UP W/ 5K 4/29/2022 06:30 4/29/2022 09:30 3.0 0 10,636.0 10,636.0 PROD1, CASING REAM XT ROT AND RECIP PIPE F/ 2,549' MD T/ 2,520' MD, 600 GPM, 1,100 PSI, 50% FO, 45 RPM, 2K TQ, (23,764 TOT. STKS) 4/29/2022 09:30 4/29/2022 10:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT SPOT 15BBLS 16 PPG HIGH VIS PILL @ 2,550' MD, BLOW DOWN TOP DRIVE, OWFF 4/29/2022 10:00 4/29/2022 11:00 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 2,550' MD T/ 2,511' MD, INCOUNTER 15K OVER PULL, KELLY UP AND ROT 10 RPM, 1-7K TQ, WHILE REAM OOH T/ 2,356' MD 4/29/2022 11:00 4/29/2022 11:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CBU 650 GPM, 1,370 PSI, 20 RPM, 1-2K TQ, 50 % FO 4/29/2022 11:30 4/29/2022 12:00 0.5 0 10,636.0 10,636.0 PROD1, CASING REAM XT BROOH F/ 2,356' MD, T/ 2,190' MD, 650 GPM, 1,370 PSI, 20 RPM, 1-7K TQ, 50 % FO 4/29/2022 12:00 4/29/2022 13:00 1.0 0 10,636.0 10,636.0 PROD1, CASING REAM XT CONT. BROOH F/ 2,190' MD, T/ 2,072' MD, 650 GPM, 1,370 PSI, 20 RPM, 1-7K TQ, 50 % FO 4/29/2022 13:00 4/29/2022 14:00 1.0 0 10,636.0 10,636.0 PROD1, CASING REAM XT BLOW DOWN TOP DRIVE, POOH ON ELEVATORS F/ 2,072' MD T/ 746' MD, PU= 68K 4/29/2022 14:00 4/29/2022 15:00 1.0 0 10,636.0 10,636.0 PROD1, CASING REAM XT POOH LAYING DOWN 4'' - 5'' HWDP, BREAK DOWN BIT SUB AND BIT 4/29/2022 15:00 4/29/2022 15:30 0.5 0 10,636.0 10,636.0 PROD1, CASING REAM XT SERVICE TOP DRIVE, BLOCKS, AND CROWN 4/29/2022 15:30 4/29/2022 16:00 0.5 0 10,636.0 10,636.0 PROD1, CASING REAM XT PU AND MU CEMENT SWIVEL, XO'S, AND PUP JOINTS, LAY DOWN INTO PIPE SHED 4/29/2022 16:00 4/29/2022 16:30 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG UP CASING EQUIPMENT AS PER DDI CASING REP 4/29/2022 16:30 4/29/2022 19:00 2.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ 3.5'' TUBING AND 4'' DRILL PIPE F/ SURFACE T/ 2548'MD 4/29/2022 19:00 4/29/2022 21:00 2.0 0 10,636.0 10,636.0 PROD1, CASING CMNT XT CIRCULATE B/U @ 191 GPM, 170PSI, 32% F/O 4/29/2022 21:00 4/29/2022 22:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CMNT XT SCHLUMBERGER FILL LINES W/ FRESHWATER, P/T TO 2500PSI, MIX AND PUMP 37.3 BBLS-13.5PPG MUD PUSH SPACER@4BPM, MIX AND PUMP 70 BBLS-15.8PPG CEMENT =@2 BPM, 370 PSI SHLUMBERGER DISPLACE W/16.6 BBLS 9.5 PPG BRINE, 4BPM =313 PSI 4/29/2022 22:00 4/30/2022 00:00 2.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT RIG DOWN/ LAY DOWN CEMENT SWIVEL,BLOW DOWN TO CEMENTERS,SIMOPS POOH FROM 2548'MD TO 1900'MD,DROP FOAM BALL AND CIRCULATE AT 286 GPM, 97PSI,10RPM,34% F/O. CEMENT IN PLACE @ 24:00 hrs 4/30/2022 00:00 4/30/2022 02:00 2.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CONT. CIRCULATE AT 286 GPM 97 PSI 10 RPM 34% FLOW OUT @ 1900' 2X B/U 5186 TOTAL STROKES Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 90/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 4/30/2022 02:00 4/30/2022 06:00 4.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT WOC WHILE/ WORKING PM'S FOR RIG CLEANING RIG AND CELLAR AREA, WELL HADS SLIGHT UTUBE CIRCULATE 1 B/U WELL STATIC 4/30/2022 06:00 4/30/2022 12:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT, PERFORM DERRICK INSPECTION, MP2'S AROUND RIG, EMPTY MUD PITS AND CLEAN, CLEAN OUT DRIP PAN, CLEAN OUT CELLAR BOX, HOUSE KEEPING AROUND RIG 4/30/2022 12:00 4/30/2022 18:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT WAIT ON CEMENT, PERFORM DERRICK INSPECTION, MP2'S AROUND RIG, EMPTY MUD PITS AND CLEAN, CLEAN OUT DRIP PAN, CLEAN OUT CELLAR BOX, HOUSE KEEPING AROUND RIG, PREP TOOLS AND EQUIPMENT FOR NIPPLE DOWN, CLEAN ROCK WASHER PITS 4/30/2022 18:00 5/1/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT CONT. TO WAIT ON CEMENT,BROKE PUP JTS OFF OF CEMENT SWIVEL AND SENT IT OUT THE BEAVER SLIDE TO GET SENT OUT,PREP TOOLS AND TEST EQUIPMENT FOR CEMENT TEST,CONT. HOUSEKEEPING AROUND THE RIG,CLEAN AND CLEAR ICE FROM WALKWAYS,ONLOAD 290 BBLS OF 10 PPG BRINE INTO THE MUD PITS. 5/1/2022 00:00 5/1/2022 05:00 5.0 0 10,636.0 10,636.0 PROD1, CASING WOC XT CONT. TO WAIT ON CEMENT,BROKE PUP JTS OFF OF CEMENT SWIVEL AND SENT IT OUT THE BEAVER SLIDE TO GET SENT OUT,PREP TOOLS AND TEST EQUIPMENT FOR CEMENT TEST,CONT. HOUSEKEEPING AROUND THE RIG,CLEAN AND CLEAR ICE FROM WALKWAYS,ONLOAD 290 BBLS OF 10 PPG BRINE INTO THE MUD PITS. 5/1/2022 05:00 5/1/2022 06:00 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT TIH TAG TOP CEMENT , PRESSURE TEST CEMENT AND 13 3/8" CASING TAG CEEMNT AT 2155' W/ 10K WITNESS BY AOGCC BRIAN BIXBY 5/1/2022 06:00 5/1/2022 06:30 0.5 0 10,636.0 10,636.0 PROD1, CASING CIRC XT CIRC @ 1.5 BPM WHILE WAIT ON AOGCC REP BRIAN BIXBY, RIH T/ 2,155' MD TAG CEMENT W/ 10K WITNESSED BY BRIAN BIXBY / BLOW DOWN TOP DRIVE 5/1/2022 06:30 5/1/2022 07:30 1.0 0 10,636.0 10,636.0 PROD1, CASING PRTS XT RIG UP TO TEST CEMENT, FLOOD LINES AND SHUT UPR, PRESSURE UP TO 1,700PSI HOLD FOR 30 MIN CHARTED, (2.6 BBLS PUMPED AND BLED OFF) WITNESSED BY AOGCC REP BRIAN BIXBY, 5/1/2022 07:30 5/1/2022 08:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG DOWN AND BLOW DOWN ALL TESTING LINES AND EQUIPMENT 5/1/2022 08:00 5/1/2022 09:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CIRC XT ROT / RECIP PIPE F/ 2,150' MD T/ 2,120' MD WHILE DISPLACING OVER T/ 10 PPG CI BRINE AS PER MUD ENG. 6 BPM, 200 PSI, 36 % FO, 40 RPM, 0.5K TQ, (3,558 TOT. STKS) 5/1/2022 09:00 5/1/2022 10:00 1.0 0 10,636.0 10,636.0 PROD1, CASING RURD XT BLOW DOWN TOP DRIVE, PREP TRIP TANK FOR TRIP OUT OF HOLE Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 91/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 5/1/2022 10:00 5/1/2022 12:00 2.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH LAYING DOWN 4'' DRILL PIPE AND 3.5 TUBING F/ 2,150' MD T/ 309' MD 5/1/2022 12:00 5/1/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT CONT. POOH LAYING DOWN 3.5 TUBING, AND RACKING 3 STDS BACK IN DERRICK F/ 309' T/ SURFACE 5/1/2022 12:30 5/1/2022 13:00 0.5 0 10,636.0 10,636.0 PROD1, CASING RURD XT RIG DOWN TUBING RUNNING EQUIPMENT, SWAP ELEVATORS, MAKE UP STACK WASHER 5/1/2022 13:00 5/1/2022 13:45 0.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ 4'' DP F/ SURFACE T/ 1,800' MD SO= 68K 5/1/2022 13:45 5/1/2022 15:30 1.7 5 10,636.0 10,636.0 PROD1, CASING TRIP XT LAY DOWN 4'' DRILL PIPE INTO SHED F/ 1,800' MD T/ SURFACE 5/1/2022 15:30 5/1/2022 16:00 0.5 0 10,636.0 10,636.0 PROD1, CASING PULD XT RIG UP AND PULL WEAR RING AS PER FMC REP 5/1/2022 16:00 5/1/2022 17:00 1.0 0 10,636.0 10,636.0 PROD1, CASING BHAH XT PICK UP BAKER CEMENT RETAINER AND MU AS PER BAKER REP 5/1/2022 17:00 5/1/2022 17:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT RIH W/ RETAINER AND SET @ 256' MD AS PER BAKER REP 5/1/2022 17:30 5/1/2022 18:30 1.0 0 10,636.0 10,636.0 PROD1, CASING TRIP XT POOH F/ 256' MD RACKING BACK 1 STD AND LAYING 6 SINGLES DOWN IN THE SHED 5/1/2022 18:30 5/1/2022 20:00 1.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR FLOOR, RIG UP AND TEST CIBP @ 1500 PSI FOR 30 MIN. CHARTED, FLOW CHECK FOR 30 MINUTES,WELL IS STATIC, 5/1/2022 20:00 5/1/2022 23:00 3.0 0 10,636.0 10,636.0 PROD1, CASING CLEN XT RIG UP STACK WASHER AND WASH STACK @ 780GPM WITH DEEP CLEAN PILL, FLUSHED AND BLEW DOWN HOLE FILL AND JET LINES PRIOR TO NIPPLE DOWN BOP'S, FLUSHED THROUGH CHOKE AND KILL LINES TAKING RETURNS THROUGH GASBUSTER WITH DEEP CLEAN PILL AS WELL,FLUSHED THROUGH CEMENT LINE. 5/1/2022 23:00 5/2/2022 00:00 1.0 0 10,636.0 10,636.0 PROD1, CASING NUND XT PJSM/START NIPPLE DOWN MPD EQUIPMENT AND BOP'S, 5/2/2022 00:00 5/2/2022 06:30 6.5 0 10,636.0 10,636.0 PROD1, CASING NUND XT PJSM/START NIPPLE DOWN MPD EQUIPMENT AND BOP'S, NIPPLE DOWN MPD EQUIP BOP'S EXTRA OA AND IA HRC'S VALVES SIMOPS FLUSH THRU ALL SUCTION DISCHARGES LINES, MUD PUMPS , MPD CHOKES WITH DEEP CLEAN PILL 5/2/2022 06:30 5/2/2022 08:30 2.0 0 10,636.0 10,636.0 PROD1, CASING CMNT XT PREP FOR RUNING TUBING, PREP FOR CEMENT JOB, CLEAN OUT CELLAR BOX 5/2/2022 08:30 5/2/2022 09:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CMNT XT RIH W/ 3.5'' TBG T/ 253' MD, AND RIG UP FOR CEMENT 5/2/2022 09:00 5/2/2022 10:00 1.0 0 10,636.0 10,636.0 PROD1, CASING CMNT XT WAIT ON WATER TRUCK FOR CEMENTERS, REMOVE BELL GUIDE FROM TOP DRIVE FOR LATCHING ONTO STRING 5/2/2022 10:00 5/2/2022 12:00 2.0 0 10,636.0 10,636.0 PROD1, CASING CMNT XT SCHLUMBERGER CEMENTERS PT LINES T/ 1,700 PSI, PUMP 20 BBLS MUD PUSH AT 1 BPM, 40.6 BBLS 15.7 PPG CEMENT CHASE WITH 1 BBLS WATER TO FLUSH LINES, RIG DOWN AND FLUSH LINES BACK T/ MUD PITS, Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03 Page 92/92 WD-03 Report Printed: 5/12/2022 Time Log & Summary Report AOGCC Job type: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Start Depth (ftKB) End Depth (ftKB) Phase Phase Op Code Activity Code Time P-T-X Operation 5/2/2022 12:00 5/2/2022 12:30 0.5 0 10,636.0 10,636.0 PROD1, CASING TRIP XT PULL OUT OF HOLE RACKING BACK 3.5'' TUBING F/ 253' MD 5/2/2022 12:30 5/2/2022 13:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CMNT XT SCHLUMBERGER TOP JOB 5 MORE BBLS 15.7PPG CEMENT, SIMOPS PREP MOUSE HOLE FOR LAYING DOWN TUBING 5/2/2022 13:00 5/2/2022 14:00 1.0 0 10,636.0 10,636.0 PROD1, CASING PULD XT CLEAN OUT CELLAR BOX AND WELL HEAD, SIMOPS LAY DOWN 3.5'' TUBING FROM DERRICK TO PIPE SHED 5/2/2022 14:00 5/2/2022 17:00 3.0 0 10,636.0 10,636.0 PROD1, CASING WWSP XT PICK UP TREE AND ADAPTER, NIPPLE UP AS PER FMC REPS / SIMOPS RIG DOWN AND LAY DOWN ALL CASING TOOLS AND EQUIPMENT 5/2/2022 17:00 5/2/2022 17:30 0.5 0 10,636.0 10,636.0 PROD1, CASING NUND XT CLEAN AND CLEAR ALL TOOLS FOR NIPPLE UP IN CELLAR AND BOP DECK, 5/2/2022 17:30 5/2/2022 18:00 0.5 0 10,636.0 10,636.0 PROD1, CASING CLEN XT CLEAN AND CLEAR RIG FLOOR OF XO'S, HANDLING EQUIPMENT, PRESSURE WASH RIG FLOOR 5/2/2022 18:00 5/3/2022 00:00 6.0 0 10,636.0 10,636.0 PROD1, CASING CLEN XT PRESSURE WASH BLOCKS AND TOP DRIVE,CLEAN CELLAR WALLS,LO/TO MUD PUMP #1 TO CHANGE LINERS AND INSPECT VALVES AND SEATS,CHECK FLUID LEVELS ON MOVING GENERATORS,PRESSURE WASH HANLING EQUIPMENT BUSHINGS,SLIPS,ELEVATORS, ETC,UNSTRING AND LAY DOWN SKATE RAIL INTO PIPE SHED RELEASE RIG @ 2400 HRS TO CD4- 597 Rig Name: DOYON 142 Rig Accept : 1/22/2022 Rig Release : 5/3/2022 Well Name: WD-03                   !" Final Definitive Survey Verified and Signed-off Yes No SLB DE: Client Representative: Date: Survey Tool Codes All targets and/or well position objectives have been achieved. I have checked to the best of my ability that the following data is correct: Surface Coordinates Declination & Convergence GRS Survey Corrections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age 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Conductor String Cement Cementing Start Date 1/10/2022 06:00 Cementing End Date 1/10/2010 12:00 Wellbore Name WD-03 Comment Cement Stages Stage # 1 Description Conductor String Cement Objective Top Depth (ftKB) 39.0 Bottom Depth (ftKB) 119.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack)Mix H20 Ratio (gal/sa…Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Conductor String Cement Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Surface String Cement Cementing Start Date 2/1/2022 22:00 Cementing End Date 2/2/2022 04:30 Wellbore Name WD-03 Comment R/U cementers and PJSM on cement job. SLB pump 5 bbls H2O and PT lines 3,500 psi. (good). Pump 120 bbls 11.0 ppg mud push II. Shut down and drop bottom plug. Pump 545 bbls 11 ppg 1669 stks 1.91 yield lead cement, Followed by 65 bbl 15.8 ppg 314 stks 1.16 yield tail cement,pump 20 bbls freshwater, shut down drop top plug, displace with rig pumps 331 bbls @ 5bpm 590 psi Full returns all job. bump plug 500psi over circ rate held for 5 min. bleed off check floats floats held CIP 4:15 hrs (380 bbls cement to surface) Cement Stages Stage # 1 Description Surface String Cement Objective Top Depth (ftKB) 39.0 Bottom Depth (ftKB) 2,434.5 Full Return? Yes Vol Cement … 380.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m… 8 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 5 P Pump Final (psi) 430.0 P Plug Bump (psi) 930.0 Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack)Mix H20 Ratio (gal/sa…Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Surface String Cement Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/3 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Intermediate String 1 Cement Cementing Start Date 2/24/2022 19:00 Cementing End Date 2/24/2022 22:30 Wellbore Name WD-03 Comment ****First Stage**** Flush and press test cmt line to 3500psi 5 min. Good test. Bleed off press and line up to MP's. Pump 50bbl 8.33ppg surfactant pill 4 bpm, 350psi SPP. Shut down and line up cementers. Mix and pump 50bbl 12.2ppg MUDPUSHII spacer @ 4.5BPM, 355psi. Drop btm plug witnessed by COP DSV and HES. Mix and pump 223 bbl G Lead cmt, (663 sx) 13.0ppg 1.89 yield at 5.5 BPM, 180 psi. Slow rate to 3 BPM 10bbl before btm plug at stage tool. Begin batch lead @19:48. Mix and pump 45 bbl G Tail cmt, (218 sx) 15.8ppg 1.16 yield at 4.5 BPM, 130 psi. Begin batch tail @ 20:48. Drop top plug witnessed by COP DSV and HES. Displace cmt w/ 3890 stks (392 bbl) 11.5ppg LSND WBM at 7-4 BPM, 30-430psi. Slow rate to 3BPM at 380bbl displaced. Bump plug 116 stks (11.5bbl) early. Bump @ 22:34. FCP: 430psi Lift press: 375psi Hold 920psi 5min. Bleed off press. Floats held. ****Second Stage**** Flush lines. Mix and pump 40bbl 11.5ppg MUDPUSHII spacer @ 4.5BPM, 315psi. Mix and pump 71 bbl G Tail cmt, (344 sx) 15.8ppg 1.16 yield at 4 BPM, 410 psi. Begin batch tail @ 10:36. Drop top plug witnessed by COP DSV and HES. Displace 20bbl FW w/ cement unit. Swap to rig pumps and displace cmt w/ 1829 stks (184 bbl) 11.0ppg LSND WBM at 6-3 BPM, 140-380psi. Slow rate to 3BPM at 169bbl displaced. Total displacement 20bbl + 184bbl = 204bbl Bump plug 41 stks (4bbl) early. Bump @ 11:54. FCP: 281psi Lift press: 243psi Hold 2000psi 5min & close stage tool Apply 2000psi & hold 5min. Bleed off press. Floats held. String: Intermediate String 1 Cement Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 2/3 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Stages Stage # 1 Description Primary – Full Bore Objective Isolate annulus Top Depth (ftKB) 6,250.0 Bottom Depth (ftKB) 9,267.6 Full Return? Yes Vol Cement … 0.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m… 7 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 4 P Pump Final (psi) 430.0 P Plug Bump (psi) 920.0 Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Flush and press test cmt line to 3500psi 5 min. Good test. Bleed off press and line up to MP's. Pump 50bbl 8.33ppg surfactant pill 4 bpm, 350psi SPP. Shut down and line up cementers. Mix and pump 50bbl 12.2ppg MUDPUSHII spacer @ 4.5BPM, 355psi. Drop btm plug witnessed by COP DSV and HES. Mix and pump 223 bbl G Lead cmt, (663 sx) 13.0ppg 1.89 yield at 5.5 BPM, 180 psi. Slow rate to 3 BPM 10bbl before btm plug at stage tool. Begin batch lead @19:48. Mix and pump 45 bbl G Tail cmt, (218 sx) 15.8ppg 1.16 yield at 4.5 BPM, 130 psi. Begin batch tail @ 20:48. Drop top plug witnessed by COP DSV and HES. Displace cmt w/ 3890 stks (392 bbl) 11.5ppg LSND WBM at 7-4 BPM, 30-430psi. Slow rate to 3BPM at 380bbl displaced. Bump plug 116 stks (11.5bbl) early. Bump @ 22:34. FCP: 430psi Lift press: 375psi Hold 920psi 5min. Bleed off press. Floats held. Cement Fluids & Additives Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 6,192.0 Est Btm (ftKB) 8,767.0 Amount (sacks) 663 Class G Volume Pumped (bbl) 223.0 Yield (ft³/sack) 1.89 Mix H20 Ratio (gal/sa… 10.39 Free Water (%) Density (lb/gal) 13.00 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 8,767.0 Est Btm (ftKB) 9,267.6 Amount (sacks) 218 Class G Volume Pumped (bbl) 45.0 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sa… 5.13 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Stage # 2 Description Stage Cementing Objective Isolate annulus Top Depth (ftKB) 3,520.0 Bottom Depth (ftKB) 4,600.0 Full Return? Yes Vol Cement … 0.0 Top Plug? Yes Btm Plug? No Q Pump Init (bbl/m… 6 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 6 P Pump Final (psi) 281.0 P Plug Bump (psi) 2,000.0 Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Flush lines. Mix and pump 40bbl 11.5ppg MUDPUSHII spacer @ 4.5BPM, 315psi. Mix and pump 71 bbl G Tail cmt, (344 sx) 15.8ppg 1.16 yield at 4 BPM, 410 psi. Begin batch tail @ 10:36. Drop top plug witnessed by COP DSV and HES. Displace 20bbl FW w/ cement unit. Swap to rig pumps and displace cmt w/ 1829 stks (184 bbl) 11.0ppg LSND WBM at 6-3 BPM, 140-380psi. Slow rate to 3BPM at 169bbl displaced. Total displacement 20bbl + 184bbl = 204bbl Bump plug 41 stks (4bbl) early. Bump @ 11:54. FCP: 281psi Lift press: 243psi Hold 2000psi 5min & close stage tool Apply 2000psi & hold 5min. Bleed off press. Floats held. String: Intermediate String 1 Cement Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 3/3 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Fluids & Additives Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 3,338.0 Est Btm (ftKB) 4,501.0 Amount (sacks) 344 Class G Volume Pumped (bbl) 71.0 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sa… 5.13 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Intermediate String 1 Cement Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 3/24/2022 06:00 Cementing End Date 3/24/2022 16:00 Wellbore Name WD-03 Comment PJSM with all employees for cementing / slb pump 3 bbls h2o and pt lines t/ 3500 psi, pump 15.3 bbls of 11.5 ppg mud push, 25.5 bbls 15.8 ppg cmt, 5.2 bbls 11.5 ppg mud push, 20 bbls fresh h2o, swap to rig chase w/ 31 bbls @ 4 bpm w/ 16 psi sting into retainer and cont pumping 26 bbls @ 1 bpm fcp 2,830 psi, un-sting from retainer psi fell off, open drill string and notice u-tubing up drill pipe, pump 2 bbls down drill pipe and still u-tubing, pump out 3 stands @ 1 bbl per stand and pull 1 dry, f/ 9,198' t/ 8,905 Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 9,161.0 Bottom Depth (ftKB) 9,529.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 1 Q Pump Final (bbl/… 1 Q Pump Avg (bbl/… 1 P Pump Final (psi) 2,550.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 9,161.0 Tag Method Tubing Depth Plug Drilled Out To (ftKB) 9,161.0 Drill Out Diameter (in) Comment PJSM with all employees for cementing / slb pump 3 bbls h2o and pt lines t/ 3500 psi, pump 15.3 bbls of 11.5 ppg mud push, 25.5 bbls 15.8 ppg cmt, 5.2 bbls 11.5 ppg mud push, 20 bbls fresh h2o, swap to rig chase w/ 31 bbls @ 4 bpm w/ 16 psi sting into retainer and cont pumping 26 bbls @ 1 bpm fcp 2,830 psi, un-sting from retainer psi fell off, open drill string and notice u-tubing up drill pipe, pump 2 bbls down drill pipe and still u-tubing, pump out 3 stands @ 1 bbl per stand and pull 1 dry, f/ 9,198' t/ 8,905 Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 9,161.0 Est Btm (ftKB) 9,529.0 Amount (sacks) 123 Class G Volume Pumped (bbl) 25.5 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sa… 5.18 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 3/26/2022 18:30 Cementing End Date 3/26/2022 20:45 Wellbore Name WD-03 Comment CEMENTERS PUMP 5 BBLS FRESH WATER, TEST SURFACE LINES T/ 5,000 PSI (TEST GOOD). PUMP 25.2 BBLS 11.5# MUD PUSH II, PUMP 211.3 BBLS 15.8# CEMENT. DROP PLUG, PUMP 5 BBLS 11.5# MUD PUSH II FOLLOWED BY 10# BRINE. CHASE PLUG @ 5 BPM, 266 PSI, 35% F/O. @ 20 BBLS AWAY SLOW DOWN T/ 3 BPM, 650 PSI, 28% F/O. @ 33.8 BBLS AWAY OBSERVE PSI SPIKE T/ 1,559 PSI AND FALL OFF @ 4100 MD , OBSERVE 28K LOSS IN HOOKLOAD F/ 121K T/ 93K. DISCONNECT CONFIRMED @ 4100' MD Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 4,179.0 Bottom Depth (ftKB) 8,994.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 4,179.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 4,179.0 Drill Out Diameter (in) Comment CEMENTERS PUMP 5 BBLS FRESH WATER, TEST SURFACE LINES T/ 5,000 PSI (TEST GOOD). PUMP 25.2 BBLS 11.5# MUD PUSH II, PUMP 211.3 BBLS 15.8# CEMENT. DROP PLUG, PUMP 5 BBLS 11.5# MUD PUSH II FOLLOWED BY 10# BRINE. CHASE PLUG @ 5 BPM, 266 PSI, 35% F/O. @ 20 BBLS AWAY SLOW DOWN T/ 3 BPM, 650 PSI, 28% F/O. @ 33.8 BBLS AWAY OBSERVE PSI SPIKE T/ 1,559 PSI AND FALL OFF @ 4100 MD , OBSERVE 28K LOSS IN HOOKLOAD F/ 121K T/ 93K. DISCONNECT CONFIRMED @ 4100' MD Cement Fluids & Additives Fluid Fluid Type Plug Back Cement Fluid Description Estimated Top (ftKB) 4,100.0 Est Btm (ftKB) 8,994.0 Amount (sacks) 500 Class G Volume Pumped (bbl) 211.3 Yield (ft³/sack) 1.61 Mix H20 Ratio (gal/sa…Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Squeeze Cementing Start Date 3/30/2022 20:30 Cementing End Date 3/30/2022 23:45 Wellbore Name WD-03 Comment FLUSH 2 BBLS FRESH WATER, TEST SURFACE LINES T/ 4,000 PSI (TEST GOOD). CEMENTERS BATCH UP MUD PUSH AND MIX WATER. CLOSE ANNULAR, PUMP DOWN KILL LINE AND TRAP 190 PSI ON BACKSIDE. CEMENTERS PUMP 20 BBLS 10.5 PPG MUD PUSH II, 43 BBLS 12 PPG CEMENT, 5 BBLS 10.5 PPG MUD PUSH AND CHASE W/ 27.5 BBLS 9.5 PPG BRINE Cement Stages Stage # 1 Description Cement Squeeze Objective Top Depth (ftKB) 3,200.0 Bottom Depth (ftKB) 3,470.0 Full Return? No Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… Q Pump Final (bbl/… Q Pump Avg (bbl/…P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment FLUSH 2 BBLS FRESH WATER, TEST SURFACE LINES T/ 4,000 PSI (TEST GOOD). CEMENTERS BATCH UP MUD PUSH AND MIX WATER. CLOSE ANNULAR, PUMP DOWN KILL LINE AND TRAP 190 PSI ON BACKSIDE. CEMENTERS PUMP 20 BBLS 10.5 PPG MUD PUSH II, 43 BBLS 12 PPG CEMENT, 5 BBLS 10.5 PPG MUD PUSH AND CHASE W/ 27.5 BBLS 9.5 PPG BRINE Cement Fluids & Additives Fluid Fluid Type Plug Back Cement Fluid Description Estimated Top (ftKB) 3,200.0 Est Btm (ftKB) 3,430.0 Amount (sacks) 168 Class *NOT IN LIBRARY Volume Pumped (bbl) 43.0 Yield (ft³/sack) 1.44 Mix H20 Ratio (gal/sa… 3.49 Free Water (%) Density (lb/gal) 12.00 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Squeeze Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 4/12/2022 23:00 Cementing End Date 4/12/2022 23:30 Wellbore Name WD-03 Comment PUMP 19BBL 13.5PPG SPACER WITH RIG PUMP FROM PILL PIT 2 STAGING UP FLOWRATE TO 4 BPM, 291PSI SPP, 20RPM, 1K TQ. (6 BBL 13.5PPG SPACER LEFT IN SURFACE LINES). LINE UP MANIFOLD TO SLB CEMENTS AND PUMP 50.3BBL 15.8PPG CMT AT 5 BPM, 190PSI, 20RPM, 1K TQ. LINE UP MANIFOLD TO RIG PUMPS AND PUMP 6BBL 13.5PPG SPACER AND 12 BBL 12.0PPG BRINE (UNDERDISPLACE BY 4 BBL). Cement Stages Stage # 1 Description Cement Plug Objective SET BALANCED PLUG ACROSS MILLED 7 5/8 CSG Top Depth (ftKB) 2,790.0 Bottom Depth (ftKB) 3,089.0 Full Return? Yes Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 5 Q Pump Final (bbl/… 4 Q Pump Avg (bbl/… 4 P Pump Final (psi) 75.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) 2,790.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 2,991.0 Drill Out Diameter (in) 6 3/4 Comment Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 2,984.0 Est Btm (ftKB) 3,089.0 Amount (sacks) 242 Class G Volume Pumped (bbl) 50.4 Yield (ft³/sack) 1.17 Mix H20 Ratio (gal/sa… 3.99 Free Water (%) Density (lb/gal) 15.80 Plastic Viscosity (cP) 68.0 Thickening Time (hr) 4.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 4/16/2022 13:30 Cementing End Date 4/16/2022 14:30 Wellbore Name WD-03 Comment BATCH UP AND PUMP 15.8BBL 13.5PPG SPACER W/ 3 BPM, 240PSI, 20RPM, 1K TQ. LOAD WIPER BALL AND BATCH UP 15.7PPG CMT. PUMP 35BBL 15.7PPG CMT AT 4 BPM, 200PSI, 20RPM, 1K TQ. BATCH UP AND PUMP 5.1BBL 13.5PPG SPACER AND 13 BBL 12.0PPG BRINE AT 5 BPM, 200PSI, 20RPM, 1K TQ. (UNDERDISPLACE BY 4 BBL). FULL RETURNS. Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 2,216.0 Bottom Depth (ftKB) 2,984.0 Full Return? Yes Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 4 Q Pump Final (bbl/… 4 Q Pump Avg (bbl/… 4 P Pump Final (psi) 15.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) 2,330.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 2,984.0 Drill Out Diameter (in) 6 3/4 Comment SET BALANCED PLUG ACROSS MILLED 7 5/8 CSG Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 2,216.0 Est Btm (ftKB) 2,984.0 Amount (sacks) 211 Class G Volume Pumped (bbl) 35.0 Yield (ft³/sack) 0.93 Mix H20 Ratio (gal/sa… 3.46 Free Water (%) Density (lb/gal) 15.70 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 4/20/2022 17:15 Cementing End Date 4/20/2022 18:30 Wellbore Name WD-03 Comment BATCH UP AND PUMP 31BBL 13.5PPG SPACER W/ 3.5 BPM, 140PSI, 20RPM, 1K TQ. LOAD WIPER BALL AND BATCH UP 16.8PPG CMT. PUMP 35BBL 16.8PPG CMT AT 3.5 BPM, 70PSI, 20RPM, 1K TQ. BATCH UP AND PUMP 10BBL 13.5PPG SPACER AND 8 BBL 10.0PPG BRINE AT 4 BPM, 410PSI, 20RPM, 1K TQ. (UNDERDISPLACE BY 3 BBL). FULL RETURNS. Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 2,228.0 Bottom Depth (ftKB) 2,991.0 Full Return? Yes Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 3 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 3 P Pump Final (psi) 50.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? Yes Pipe RPM (rpm) Tagged Depth (ftKB) 2,294.0 Tag Method Drill Bit Depth Plug Drilled Out To (ftKB) 2,869.0 Drill Out Diameter (in) 6 3/4 Comment SET BALANCED PLUG ACROSS MILLED 7 5/8 CSG Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 2,228.0 Est Btm (ftKB) 2,991.0 Amount (sacks) 226 Class G Volume Pumped (bbl) 35.0 Yield (ft³/sack) 0.87 Mix H20 Ratio (gal/sa… 3.51 Free Water (%) Density (lb/gal) 16.80 Plastic Viscosity (cP) 45.0 Thickening Time (hr) 4.00 CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 4/25/2022 16:00 Cementing End Date 4/25/2022 17:30 Wellbore Name WD-03 Comment PT LINES T/ 2,500 PSI, PUMP 23 BBLS 13.5 PPG MUD PUSH, 20 BBLS 16.8 PPG CEMENT, 7 BBLS 13.5 PPG MUD PUSH, CHASED W/ 14.3 BBLS 9.5 PPG LSND, ALL PUMPED @ 2 BPM BY SCHLUMBERGER CEMENTERS, RECIP PIPE 10' DURING ENTIRE JOB F/ 2,856' MD T/ 2,846 Cement Stages Stage # 1 Description Plug – Plug Back / Abandonment Plug Objective Top Depth (ftKB) 2,575.0 Bottom Depth (ftKB) 2,856.0 Full Return? Yes Vol Cement … 7.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 3 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 3 P Pump Final (psi) 50.0 P Plug Bump (psi) Recip? Yes Stroke (ft) 12.00 Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 2,575.0 Tag Method Work String Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment SET BALANCED PLUG ACROSS MILLED 7 5/8 CSG Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack)Mix H20 Ratio (gal/sa…Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 4/29/2022 21:00 Cementing End Date 4/29/2022 22:35 Wellbore Name WD-03 Comment SCHLUMBERGER FILL LINES W/ FRESHWATER, P/T TO 2500PSI, MIX AND PUMP 37.3 BBLS-13.5PPG MUD PUSH SPACER@4BPM, MIX AND PUMP 70 BBLS-15.8PPG CEMENT =@2 BPM, 370 PSI SHLUMBERGER DISPLACE W/16.6 BBLS 9.5 PPG BRINE, 4BPM =313 PSI Cement Stages Stage # 1 Description Plug – Plug Back / Abandonment Plug Objective Top Depth (ftKB) 2,155.0 Bottom Depth (ftKB) 2,548.0 Full Return? Yes Vol Cement … 0.0 Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 3 Q Pump Final (bbl/… 3 Q Pump Avg (bbl/… 3 P Pump Final (psi) 335.0 P Plug Bump (psi) Recip? No Stroke (ft) 0.00 Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) 2,155.0 Tag Method Work String Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment SET Balanced plug from 2548' to 2100SCHLUMBERGER FILL LINES W/ FRESHWATER, P/T TO 2500PSI, MIX AND PUMP 37.3 BBLS-13.5PPG MUD PUSH SPACER@4BPM, MIX AND PUMP 70 BBLS-15.8PPG CEMENT =@2 BPM, 370 PSI SHLUMBERGER DISPLACE W/16.6 BBLS 9.5 PPG BRINE, 4BPM =313 PSI Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft³/sack)Mix H20 Ratio (gal/sa…Free Water (%) Density (lb/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… Page 1/1 WD-03 Report Printed: 5/31/2022 Cement Detail Report Cement Details Description Cement Plug Cementing Start Date 5/2/2022 10:00 Cementing End Date 5/2/2022 12:00 Wellbore Name WD-03 Comment SCHLUMBERGER CEMENTERS PT LINES T/ 1,700 PSI, PUMP 20 BBLS MUD PUSH AT 1 BPM, 40.6 BBLS 15.7 PPG CEMENT CHASE WITH 1 BBLS WATER TO FLUSH LINES, RIG DOWN AND FLUSH LINES BACK T/ MUD PITS, Cement Stages Stage # 1 Description Cement Plug Objective Top Depth (ftKB) 38.6 Bottom Depth (ftKB) 256.0 Full Return? Yes Vol Cement …Top Plug? No Btm Plug? No Q Pump Init (bbl/m… 2 Q Pump Final (bbl/… 2 Q Pump Avg (bbl/… 2 P Pump Final (psi) 280.0 P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Abandonment Cement Fluid Description Estimated Top (ftKB) 38.6 Est Btm (ftKB) 256.0 Amount (sacks) 221 Class G Volume Pumped (bbl) 45.6 Yield (ft³/sack) 1.16 Mix H20 Ratio (gal/sa… 5.16 Free Water (%) Density (lb/gal) 15.70 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label String: Cement Plug Job: DRILLING ORIGINAL-<jobsubtyp> 1/21/2… t>>ED W/η^Zs/KZZη&/>ED^Zs/^Z/Wd/KE >/sZ>^Z/Wd/KE ddzW d>K'' ŝƌĞĐƚŝŽŶĂů^ƵƌǀĞLJWD-03 50-103-20835-00-00 221-103 CRU MWD/LWD/DD MLWD EOW FINAL FIELD 8-Mar-22 1 1#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!dƌĂŶƐŵŝƚƚĂůZĞĐĞŝƉƚͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺyͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺWƌŝŶƚEĂŵĞ ^ŝŐŶĂƚƵƌĞ ĂƚĞWůĞĂƐĞƌĞƚƵƌŶǀŝĂĐŽƵƌŝĞƌŽƌƐŝŐŶͬƐĐĂŶĂŶĚĞŵĂŝůĂĐŽƉLJƚŽ^ĐŚůƵŵďĞƌŐĞƌ͘ůĂƐŬĂWd^WƌŝŶƚĞŶƚĞƌΛƐůď͘ĐŽŵ^>ƵĚŝƚŽƌͲdƌĂŶƐŵŝƚƚĂůZĞĐĞŝƉƚƐŝŐŶĂƚƵƌĞĐŽŶĨŝƌŵƐƚŚĂƚĂƉĂĐŬĂŐĞ;ďŽdž͕ĞŶǀĞůŽƉĞ͕ĞƚĐ͘ͿŚĂƐďĞĞŶƌĞĐĞŝǀĞĚĂŶĚƚŚĞĐŽŶƚĞŶƚƐŽĨƚŚĞƉĂĐŬĂŐĞŚĂǀĞďĞĞŶǀĞƌŝĨŝĞĚƚŽŵĂƚĐŚƚŚĞŵĞĚŝĂŶŽƚĞĚĂďŽǀĞ͘dŚĞƐƉĞĐŝĨŝĐĐŽŶƚĞŶƚŽĨƚŚĞƐĂŶĚͬŽƌŚĂƌĚĐŽƉLJƉƌŝŶƚƐŵĂLJŽƌŵĂLJŶŽƚŚĂǀĞďĞĞŶǀĞƌŝĨŝĞĚĨŽƌĐŽƌƌĞĐƚŶĞƐƐŽƌƋƵĂůŝƚLJůĞǀĞůĂƚƚŚŝƐƉŽŝŶƚ͘η^ĐŚůƵŵďĞƌŐĞƌͲWƌŝǀĂƚĞPTD:221-103T36632Kayla JunkeDigitally signed by Kayla Junke Date: 2022.05.18 11:02:36 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:5 Township:11N Range:5E Meridian:Umiat Drilling Rig:Doyon 142 Rig Elevation:Total Depth:10,636 ft MD Lease No.:ADL025559 Operator Rep:Suspend:XXX P&A: Conductor:20 O.D. Shoe@ 119 Feet Csg Cut@ Feet Surface:13 3/8 O.D. Shoe@ 2435 Feet Csg Cut@ Feet Intermediate:7 5/8 O.D. Shoe@ 9268 Feet Csg Cut@ Feet Production:O.D. Shoe@ Feet Csg Cut@ Feet Liner:O.D. Shoe@ Feet Csg Cut@ Feet Tubing:O.D. Tail@ Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Open Hole Bridge plug 2860 ft 2155 ft 10 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing 1700 1620 1590 IA 0 0 0 OA 0 0 0 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Adam Dorr Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): Witness 10K stacked on 15.8 ppg cement plug and pressure tested for 30 minutes. May 1, 2022 Brian Bixby Well Bore Plug & Abandonment CRU WD-03 Conoco Phillips Alaska Inc. PTD 2211030; Sundry 322-186 none Test Data: P Casing Removal: rev. 11-28-18 2022-0501_Plug_Verification_CRU_WD-03_bb            CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rig 142 To:Regg, James B (OGC);Brooks, Phoebe L (OGC);inspectors@alaska.gov Subject:3"x6"VBR test Date:Friday, April 29, 2022 3:17:13 AM Attachments:WD-03 3.5X6VBR 4-29-22.pdf image001.png Attached is test for upper pipe rams 3.5” x 6” VBR’s w/ 3.5” and 4” test joints /#66*'95#/ Rig 142 Tourpusher Rig142@doyondrilling.com Doyon Rig 142 907-670-6002 Cell, 907-322-3715 &58:' 37' 'R\RQ5LJ -5HJJ CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rig 142 To:Regg, James B (OGC);Brooks, Phoebe L (OGC) Subject:RE: 4-26-22 bop test form Date:Wednesday, April 27, 2022 7:11:04 PM Attachments:D142_7.625 Csg Ram Test 4-27-22.pdf image001.png Attached is Test chart for 7-5/8 fixed Upper pipe rams, 250/3500psi w/ Annular, and 250/5000psi with Upper pipe rams From: Rig 142 Sent: Wednesday, April 27, 2022 6:02 AM To: 'Regg, James B (DOA)' <jim.regg@alaska.gov>; phoebe.brooks@alaska.gov Subject: 4-26-22 bop test form Attached 4-26-22 BOP test form /#66*'95#/ Rig 142 Tourpusher Rig142@doyondrilling.com Doyon Rig 142 907-670-6002 Cell, 907-322-3715 &58:' 37' r 7-5/8 fixed Upper pipe rams, / Annular, -5HJJ CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rig 142 To:Regg, James B (OGC);Brooks, Phoebe L (OGC) Subject:4-26-22 bop test form Date:Wednesday, April 27, 2022 6:02:42 AM Attachments:WD-03 4-26-22 AOGCC test form.xlsx image001.png Attached 4-26-22 BOP test form /#66*'95#/ Rig 142 Tourpusher Rig142@doyondrilling.com Doyon Rig 142 907-670-6002 Cell, 907-322-3715 &58:' 37' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: 39 ft Total Depth: 10636 ft MD Lease No.: ADL025559 Operator Rep: Suspend: P&A: X Conductor: 20" O.D. Shoe@ 119 Feet Csg Cut@ Feet Surface: 13-3/8" O.D. Shoe@ 2435 Feet Csg Cut@ Feet Intermediate: 7-5/8" O.D. Shoe@ 9268 Feet Csg Cut@ Feet Production: O.D. Shoe@ Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: O.D. Tail@ Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Bridge plug 2856 ft 2575 ft 9.5 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing IA OA Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: I traveled to CRU WD-03 for a top-of-cement tag on the 4th plug in the P&A process. The top of the plug was found @ 2575 feet; tagged with 10K lbs weight. They retagged at the same depth. No pressure test was required or performed. April 26, 2022 Lou Laubenstein Well Bore Plug & Abandonment CRU WD-03 ConocoPhillips alaska PTD 221-103; Sundry 322-195 none Test Data: Casing Removal: Adam Dorr Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 11-28-18 2022-0426_Plug_Verification_CRU_WD-03_ll 9 9 99 9 9999 9 9 9 999 9 9 James B. Regg Digitally signed by James B. Regg Date: 2022.04.28 22:33:06 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSu b m i tt t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:142 DATE: 4/26/22 Rig Rep.: Rig Phone: 670-6002 Operator: Op. Phone:670-6001 Rep.: E-Mail Well Name: PTD #22211030 Sundry #322-186 Operation: Drilling: Workover: X Explor.: Test: Initial: Weekly: Bi-Weekly: X Other: Rams:250/4500 Annular:250/2500 Valves:250/4500 MASP:4128 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 1P Housekeeping P Rig P Lower Kelly 1P PTD On Location P Hazard Sec.P Ball Type 2P Standing Order Posted P Misc.NA Inside BOP 1P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13-5/8 5M P Pit Level Indicators PP #1 Rams 1 3.5" x 6"P Flow Indicator PP #2 Rams 1 Blind/Shear P Meth Gas Detector PP #3 Rams 1 3.5'' x 6''P H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 3-1/8'' 5M P Inside Reel valves 0NA HCR Valves 2 3-1/8'' 5M P Kill Line Valves 1 3-1/8'' 5M P Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 0NA Time/Pressure Test Result System Pressure (psi)3050 P CHOKE MANIFOLD:Pressure After Closure (psi)1825 P Quantity Test Result 200 psi Attained (sec)8 P No. Valves 14 P Full Pressure Attained (sec)59 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): 6 @ 2000 psi P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:0 Test Time:4.5 Hours Repair or replacement of equipment will be made within days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 4/25/22@6:54am Waived By Test Start Date/Time:4/26/2022 0:30 (date) (time)Witness Test Finish Date/Time:4/26/2022 5:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Lou Laubenstein Doyon Test Annular to 3500psi w/ 3½, 4" Test jt, Test Rams #1 & #3 w/ both 3.5" & 4" test jts, all test 250-lo,5000-Hi 5min ea. On chart. All rams functioned from both primary & remote controls, upper/lower IBOP, two ea. 4"fosv & one 4"dart, Test all gas, H2S, Flow & PVT alarms both audible & visual, Drawdown conducted with 2-air & 2-elec pumps. Time to close rams, Annular= 14 sec, UPR= 7 sec, LPR= 7 sec, blind rams= 7 sec, choke/kill hcr= 3 sec. F.Carlo / M.Sam CPAI A. Dorr / M. Aurthur CRU WD-03 Test Pressure (psi): rig142@doyondrilling.com Form 10-424 (Revised 02/2022) 2022-0426_BOP_Doyon142_CRU_WD-03 9 99 9 9 9999 9 9 - 5HJJ Time to close rams, Annular= 14 sec, UPR= 7 sec, LPR= 7 sec, blind rams= 7 sec, choke/kill hcr= 3 sec. 4/26/22 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: 39ft Total Depth: 10636 ft MD Lease No.: ADL025559 Operator Rep: Suspend: P&A: X Conductor: 20" O.D. Shoe@ 119 Feet Csg Cut@ Feet Surface: 13-3/8" O.D. Shoe@ 2435 Feet Csg Cut@ Feet Intermediate: 7-5/8" O.D. Shoe@ 9268 Feet Csg Cut@ Feet Production: O.D. Shoe@ Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: O.D. Tail@ Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Bridge plug 3190 ft 2869 ft 10.7 ppg Drillpipe tag Initial 15 min 30 min 45 min Result 4/22/2022 Tubing 1794 1590 IA OA 36 37 Initial 15 min 30 min 45 min Result 4/24/2022 Tubing 1651 1611 1584 IA OA 32 32 31 Remarks: Attachments: Adam Dorr P Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): 4/22/22 - I traveled to WD-03 to witness a tag on top of cement and an MIT of the cement plug isolating the C-10 Halo sand. Upon my arrival they were still drilling down on the plug to the final depth of 2869 ft MD. That depth was achieved and verified with a tag using 20k lbs. The well was pressured up for the MIT and immediately the pressure was seem bleeding down. It was deemed to be a failure after the first 15 minutes and diagnostic testing was being planned when I left location. 4/24/22 - I traveled back to location for another attempt to pressure test the cement plug in WD-03. I arrived on location and discussed with Adam Dorr what changes had been done. As part of their diagostics the wellbore was displaced to 9.5 ppg KCL above the cement plug. The test passed on this attempt without issue. April 24, 2022 Lou Laubenstein Well Bore Plug & Abandonment CRU WD-03 ConocoPhillips Alaska PTD 221-103; Sundry 322-195 none Test Data: F Casing Removal: rev. 11-28-18 2022-0424_Plug_Verification_CRU_WD-03_ll 9 9 9 9 99 9 999 9 9 9 9 9 9 99 9 9 9 9 4/22/2022 4/24/2022 James B. Regg Digitally signed by James B. Regg Date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y Samantha Carlisle at 3:32 pm, Apr 25, 2022  'LJLWDOO\VLJQHGE\*UHJ+REEV '12 :HOOV&1 *UHJ+REEV ( JUHJVKREEV#FRQRFRSKLOOLSVFRP 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ *UHJ +REEV 12 12 ; ; ILOH Z 37'  %23 SUHVVXUH WHVW WR  SVLJ $QQXODU SUHYHQWHU SUHVVXUH WHVW WR  SVLJ &RQGLWLRQV RI DSSURYDO RQ RULJLQDO 37' DQG VXEVHTXHQW VXQGULHV DSSO\ ; '656)' 9LFWRULD /RHSS  ; ;  GWV -/&  Jeremy Price Digitally signed by Jeremy Price Date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±IW0'DQGSSJEULQH FLUFXODWHGLQWRWKHLQ[LQDQQXOXV7KHZHOOKDVEHHQFRQILUPHGVWDWLFERWKYLDZHOOERUHPRQLWRULQJ DQGYLDDQDFRXVWLFORJWKDWFRQILUPHGQRIOXLGIORZEHKLQGWKHLQFDVLQJ7KH´FDVLQJKDVEHHQVHFWLRQ PLOOHGIURP¶WR¶0'DQGPXOWLSOHEDODQFHGFHPHQWSOXJVKDYHEHHQVHWDFURVVWKHVHFWLRQZLWK72& DW¶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¶WR¶0' 3ODFHGEDODQFHGFHPHQWSOXJIURP¶WR¶&OHDQRXWWR¶SHU$2*&& 3ODFHEDODQFHGFHPHQWSOXJIURP¶0'WR¶0'7DJJHGZN:2%DQGGULOOHGGRZQWR ¶0'ZLWKOLWWOHUHVLVWDQFH'HFLVLRQPDGHWRGULOORXWDQGVSRWDQRWKHUSOXJ&OHDQHGRXWWR¶ 0' 3ODFHEDODQFHGFHPHQWSOXJIURP¶0'WR¶0'WDJJHGZN:2%'ULOORXWKDUGFHPHQW WR¶0'7DJ3UHVVXUHWHVWVXFFHVVIXOO\  :'3URSRVHG2SHUDWLRQV3URJUDP(Requirements of 20 AAC 25.015 (b)(2)) &LUFXODWHZHOOERUHFOHDQDQG722+ 38FDVLQJVFUDSHUDQGUHFLSURFDWHDFURVVEULGJHSOXJVHWGHSWKDW¶0' 722+DQGSLFNXSEULGJHSOXJ7,+DQGVHWEULGJHSOXJDW¶0'7DJDQGSUHVVXUHWHVWWRSVL 722+ 38´FHPHQWVWLQJHUDQG7,+WR¶ 3ODFHEEOVSSJFHPHQWSOXJIURP¶WR¶0'&LUFXODWHZHOOERUHFOHDQDQG722+DQGOD\ GRZQFHPHQWVWLQJHU :2&WRSVL8&$ 7,+ZPHFKDQLFDOFDVLQJFXWWHUWRa¶0'3HUIRUPSUHVVXUHWHVWRQFHPHQWSOXJ 3HUIRUPFDVLQJFXWDW¶0' 72+WR¶0'3HUIRUPVHFRQGFDVLQJFXW &LUFXODWHZHOOERUHRYHUWRSSJEULQH 722+ZLWKFXWWLQJWRROV &KDQJH835WR´IL[HGFDVLQJUDPVDQGSUHVVXUHWHVWWRSVLSVLIRUPLQ1RWH1RWLI\ $2*&& 58DQGDWWHPSWWRSXOO´FDVLQJIUHH 3XOO´FDVLQJWRVXUIDFHDQGOD\GRZQ 5,+Z'3DQGVSHDUWRSXOOUHPDLQLQJFDVLQJ 722+DQGOD\GRZQFDVLQJ 38´FHPHQWVWLQJHU 7,+ZVWLQJHUWR¶0' 3XPSVSDFHUIROORZHGE\EEOVRISSJFHPHQWDQGGLVSODFHPHQWIOXLGWRVSRWDEDODQFHGFHPHQWSOXJ 3XOORXWRISOXJDQGFLUFXODWHZHOOERUHFOHDQIURPWRSRIWKHFHPHQWSOXJ 722+DQGOD\GRZQFHPHQWVWLQJHU :2&XQWLOSVL8&$ 7,+ZLWKFOHDQRXW%+$DQGFOHDQRXWWR¶0'7DJDQGSUHVVXUHWHVWSOXJWRSVL1RWH1RWLI\ $2*&&DQG(3$ (YDQ2VERUQHDW  &LUFXODWHZHOOWR&RUURVLRQ,QKLELWHGSSJ%ULQH 722+WRVXUIDFH 38´%ULGJH3OXJ 7,+WR¶0'DQGVHWEULGJHSOXJ 322+OD\GRZQUXQQLQJWRROV 7,+ZLWK´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ƌŝĐĂ͕  ƉƉƌŽǀĂůŝƐŐƌĂŶƚĞĚĨŽƌƚŚĞƉĂƚŚĨŽƌǁĂƌĚŽƵƚůŝŶĞĚďĞůŽǁ͘WůĞĂƐĞĨŽůůŽǁƵƉǁŝƚŚĂĐŚĂŶŐĞŽĨ ĂƉƉƌŽǀĞĚƉƌŽŐƌĂŵƐƵŶĚƌLJĂƐƐŽŽŶĂƐƉŽƐƐŝďůĞ͘  sŝĐƚŽƌŝĂ  Victoria Loepp 6HQLRU3HWUROHXP(QJLQHHU 6WDWHRI$ODVND 2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ :WK$YH $QFKRUDJH$.  :RUN    9LFWRULD/RHSS#DODVNDJRY  CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov    &ƌŽŵ͗>ŝǀŝŶŐƐƚŽŶ͕ƌŝĐĂ:фƌŝĐĂ͘:͘>ŝǀŝŶŐƐƚŽŶΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ĞŶƚ͗^ƵŶĚĂLJ͕ƉƌŝůϮϰ͕ϮϬϮϮϵ͗ϰϰD dŽ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх Đ͗KƐďŽƌŶĞ͕ǀĂŶфKƐďŽƌŶĞ͘ǀĂŶΛĞƉĂ͘ŐŽǀх͖W/>ŝĂŝƐŽŶKĨĨŝĐĞƌ фĂŶĐŝŵƚůŶŽΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖ƌŝůůŝŶŐ^ƵƉĞƌǀŝƐŽƌ͕ŽLJŽŶϭϰϮфĚϭϰϮĐŵΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖ dŽůŵĂŶ͕ĞŶsфĞŶ͘s͘dŽůŵĂŶΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖,ŽďďƐ͕'ƌĞŐ^ ф'ƌĞŐ͘^͘,ŽďďƐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖>ŝǀŝŶŐƐƚŽŶ͕ƌŝĐĂ:фƌŝĐĂ͘:͘>ŝǀŝŶŐƐƚŽŶΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖ ,ĞƌƌŝŶŐ͕<ĞŝƚŚф<ĞŝƚŚ͘͘,ĞƌƌŝŶŐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх ^ƵďũĞĐƚ͗tͲϬϯWĂƚŚ&ŽƌǁĂƌĚϰͲϮϰͲϮϬϮϮ  sŝĐƚŽƌŝĂ͕  dŚĂŶŬLJŽƵĨŽƌďĞŝŶŐĂǀĂŝůĂďůĞƚŽĚŝƐĐƵƐƐƉĂƚŚĨŽƌǁĂƌĚŽŶĂ^ƵŶĚĂLJŵŽƌŶŝŶŐ͘  ƐǁĞĚŝƐĐƵƐƐĞĚ͕ǁĞĚŝĚĂĐŚŝĞǀĞŵƵůƚŝƉůĞƉĂƐƐŝŶŐƉƌĞƐƐƵƌĞƚĞƐƚƐŽǀĞƌŶŝŐŚƚǁŝƚŚƚŚĞŽƌŝŐŝŶĂůƐŽƵƌĐĞ ĐŽŶƚƌŽůĨůƵŝĚ͘  dŚĞƉůĂŶŶĞĚƉĂƚŚĨŽƌǁĂƌĚŝƐĂƐĨŽůůŽǁƐ͗  ϭ͘ KďƚĂŝŶƐƚĂƚĞǁŝƚŶĞƐƐĞĚƉƌĞƐƐƵƌĞƚĞƐƚŽĨĐĞŵĞŶƚƉůƵŐĂƚϮ͕ϴϲϵĨƚ͘ Ϯ͘ ŝƐƉůĂĐĞƚŽϵ͘ϱƉƉŐŵƵĚ͘ ϯ͘ ZƵŶĐĂƐŝŶŐƐĐƌĂƉĞƌƚŽdKĂƚϮ͕ϴϲϵĨƚ͘ ϰ͘ Z/,ĂŶĚƐĞƚďƌŝĚŐĞƉůƵŐΛϮ͕ϴϲϬĨƚ;ũƵƐƚĂďŽǀĞdKͿĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘ ϱ͘ Z/,ǁŝƚŚĐĞŵĞŶƚƐƚŝŶŐĞƌĂŶĚƉƵŵƉΕϮϬďĂƌƌĞůĐĞŵĞŶƚƉůƵŐ͘WŝĐŬƵƉĂŶĚĐŝƌĐƵůĂƚĞŽƵƚĐĞŵĞŶƚ ĂƚĂƉƉƌŽdžŝŵĂƚĞůLJϮ͕ϱϳϱĨƚ;ĂƉƉƌŽdžŝŵĂƚĞůLJϮϱĨƚďĞůŽǁƉůĂŶŶĞĚĐĂƐŝŶŐĐƵƚĚĞƉƚŚͿ͘dŚŝƐƉůĂĐĞƐĂ ĐĞŵĞŶƚƉůƵŐŽĨϮϴϱĨƚŽŶƚŽƉŽĨƚŚĞďƌŝĚŐĞƉůƵŐ͘ ϲ͘ dƌŝƉŽƵƚŽĨŚŽůĞǁŝƚŚĐĞŵĞŶƚƐƚŝŶŐĞƌĂƐƐĞŵďůLJ͘ ϳ͘ tĂŝƚŽŶĐĞŵĞŶƚ͘ ϴ͘ Z/,ǁŝƚŚĐĂƐŝŶŐĐƵƚƚĞƌĂƐƐĞŵďůLJ͘WƌĞƐƐƵƌĞƚĞƐƚĐĞŵĞŶƚƉůƵŐ͘ ϵ͘ ^ƚĂƌƚĐĂƐŝŶŐĐƵƚƚŝŶŐŽƉĞƌĂƚŝŽŶƐĂƚϮ͕ϱϱϬĨƚ͘ ϭϬ͘ ŽŶƚŝŶƵĞǁŝƚŚƉůĂŶĂůƌĞĂĚLJĂƉƉƌŽǀĞĚǀŝĂ^ƵŶĚƌLJ͘  ƐǁĞĚŝƐĐƵƐƐĞĚ͕ŝĨLJŽƵĐŽƵůĚƌĞǀŝĞǁƚŚĞĂďŽǀĞƉƌŽƉŽƐĞĚƉĂƚŚĨŽƌǁĂƌĚĂŶĚƉƌŽǀŝĚĞĂƌĞƐƉŽŶƐĞƚŽ ƚŚŝƐĞͲŵĂŝůĞĂƌůLJƚŽĚĂLJƚŚĂƚǁŽƵůĚďĞĂƉƉƌĞĐŝĂƚĞĚ͘  /ĨĂŶLJƋƵĞƐƚŝŽŶƐ͕ƉůĞĂƐĞĚŽŶŽƚŚĞƐŝƚĂƚĞƚŽĐĂůůŵĞ͘  dŚĂŶŬLJŽƵ͕  Erica Livingston tĞůůƐŚŝĞĨŶŐŝŶĞĞƌ͕Wͮ͘͘ŽŶŽĐŽWŚŝůůŝƉƐůĂƐŬĂ нϭϵϬϳϴϱϰϲϴϴϲ;ĐĞůůͿ ĞŬĂƉƉĞůΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵ  CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rig 142 To:Regg, James B (OGC);DOA AOGCC Prudhoe Bay;Brooks, Phoebe L (OGC) Cc:Samuel Dye Subject:Doyon rig 142 BOP test 4-14-22 Date:Sunday, April 17, 2022 12:29:14 AM Attachments:image001.png WD-03 4-14-22 AOGCC test form.xlsx Doyon 142 BOP test 4-14-22 Harley Huntington Rig 142 Tourpusher Rig142@doyondrilling.com Doyon Rig 142 Office 907-670-6002 Cell, 907-602-2105 &58:' 37' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 5 Township: 11N Range: 5E Meridian: Umiat Drilling Rig: Doyon 142 Rig Elevation: Total Depth: 10,636 ft MD Lease No.: ADL025559 Operator Rep: Suspend: P&A: X Conductor: 20" O.D. Shoe@ 119 Feet Csg Cut@ na Feet Surface: 13 3/8" O.D. Shoe@ 2435 Feet Csg Cut@ na Feet Intermediate: 7 5/8" O.D. Shoe@ 9268 Feet Csg Cut@ na Feet Production: O.D. Shoe@ Feet Csg Cut@ Feet Liner: O.D. Shoe@ Feet Csg Cut@ Feet Tubing: O.D. Tail@ Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Fullbore Retainer 4179 ft 2620 ft 12.0 ppg Drillpipe tag Fullbore Retainer 4179 ft 2979 ft 12.0 ppg Drillpipe tag Initial 15 min 30 min 45 min Result Tubing 550 IA OA Initial 15 min 30 min 45 min Result Tubing 925 IA OA Remarks: Attachments: Adam Dorr Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): F This report covers two attempts at a plug tag and pressure test of the third cement plug - isolating the Halo C-10 formation. The cement plug was pumped after a long 7 5/8-inch casing milling operation. 4/13/2022: The first attempted tagged found top of cement @ 2620 ft MD - cement was tagged with 5k lbs down weight and found mushy. 4/14/2022: Tag again. Soft, mushy tag. Could barely get 5K lbs. Pressure test failed with break-over at 550psi. CPAI decided to wash/mill cement down to 2979 ft MD and wait for the cement to cure. 4/15/2022: The second tag/test attempt after milling cement to 2979 ft MD. Plug would take 12K lbs down wt with no problem but still not hold pressure. The second test broke-over at 925 psi. April 15, 2022 Adam Earl Well Bore Plug & Abandonment CRU WD-03 CPAI PTD 2211030; Sundry 322-186 none Test Data: F Casing Removal: rev. 11-28-18 2022-0415_Plug_Verification_CRU_WD-03_Halo_ae 9 99 9 9 9 9 9 9 9 9 9 9 à 9 9 9 4/13/2022: The first attempted 4/14/2022: Tag again. 4/15/2022: The second tag/test attempt James B. Regg Digitally signed by James B. Regg Date: 2022.04.19 16:36:37 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSu b m i tt t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:142 DATE: 4/14/22 Rig Rep.: Rig Phone: 670-6002 Operator: Op. Phone:670-6001 Rep.: E-Mail Well Name: PTD #22211030 Sundry #322-186 Operation: Drilling: Workover: X Explor.: Test: Initial: Weekly: Bi-Weekly: X Other: Rams:250/4500 Annular:250/2500 Valves:250/4500 MASP:4128 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 1P Housekeeping P Rig P Lower Kelly 1P PTD On Location P Hazard Sec.P Ball Type 2P Standing Order Posted P Misc.NA Inside BOP 1P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13-5/8 5M P Pit Level Indicators PP #1 Rams 1 3.5" x 6"P Flow Indicator PP #2 Rams 1 Blind/Shear P Meth Gas Detector PP #3 Rams 1 3.5'' x 6''P H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 3-1/8'' 5M P Inside Reel valves 0NA HCR Valves 2 3-1/8'' 5M P Kill Line Valves 1 3-1/8'' 5M P Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 0NA Time/Pressure Test Result System Pressure (psi)3050 P CHOKE MANIFOLD:Pressure After Closure (psi)1825 P Quantity Test Result 200 psi Attained (sec)8 P No. Valves 14 P Full Pressure Attained (sec)57 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): #6@ 2000 P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:0 Test Time:6.3 Hours Repair or replacement of equipment will be made within days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 4-12-22 /21:00 Waived By Test Start Date/Time:4/14/2022 17:45 (date) (time)Witness Test Finish Date/Time:4/14/2022 0:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Adam Earl Doyon Test Annular to 3500psi w/ 3½ & 4" Test jt, Test Rams #1 & #3 w/ both 3.5" & 4" test jts, all test 250-lo,5000-Hi 5min ea. On chart. All rams functioned from both primary & remote controls, upper/lower IBOP, 2-4"fosv, 1- 4"dart valves, Test all gas, H2S, Flow & PVT alarms both audible & visual, Drawdown conducted with 2-air & 2-elec pumps. Time to close rams, Annular= 14 sec, UPR= 7 sec, LPR= 7 sec, blind rams= 7 sec, choke/kill hcr= 3 sec. B.Marmon / H, Huntington CPAI A. Dorr / J.Benedict CRU WD-03 Test Pressure (psi): rig142@doyondrilling.com Form 10-424 (Revised 02/2022) 2022-0414_BOP_Doyon142_CRU_WD-03 999 9 9 9 999 9 9 -5HJJ e to close rams, Annular= 14 sec, UPR= 7 sec, LPR= 7 sec, blind rams= 7 sec, choke/kill hcr= 3 sec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y Samantha Carlisle at 4:36 pm, Apr 07, 2022  'LJLWDOO\VLJQHGE\*UHJ+REEV '12 :HOOV&1 *UHJ+REEV ( JUHJVKREEV#FRQRFRSKLOOLSVFRP 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ *UHJ +REEV ; $EDQGRQ ; ; 12 97/  97/  %23( WHVW SUHVVXUH WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ &RQGLWLRQV RI DSSURYDO RQ RULJLQDO 37' DSSO\ $YDULDQFH WR  $$&  D  LV JUDQWHG WR DOORZ DQ RSHQ KROH FHPHQW SOXJ WR EH SODFHG  PG ; DERYH WKH WRS RI WKH & +DOR  $$&  M ;  97/  ILOH Z 37'  6)' 97/  12  GWV -/&  Jeremy Price Digitally signed by Jeremy Price Date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±IW0'DQGSSJEULQH FLUFXODWHGLQWRWKHLQ[LQDQQXOXV7KHZHOOKDVEHHQFRQILUPHGVWDWLFERWKYLDZHOOERUHPRQLWRULQJ DQGYLDDQDFRXVWLFORJWKDWFRQILUPHGQRIOXLGIORZEHKLQGWKHLQFDVLQJ7KH´FDVLQJKDVEHHQVHFWLRQ PLOOHGIURP¶WR¶0'  :'&XUUHQW6FKHPDWLF     3ULRU2SHUDWLRQV  3XOOHGLQOLQHU 3HUIRUPHGIXOO%23WHVW $2*&&ZLWQHVVHG  $EDQGRQHGGLVSRVDO]RQHDQGORZHUSRUWLRQRIZHOOERUHZLWKFHPHQWDQGEULGJHSOXJWRIW0' 3HUIRUDWHGLQFDVLQJDQGFLUFXODWHGSSJEULQHLQWRRXWHUDQQXOXV 3HUIRUPHGGLDJQRVWLFORJVWRFRQILUPQRIORZEHKLQGLQFDVLQJ 5,+ZLWKUHWDLQHUWRIW0'DQGFLUFXODWHGFHPHQWHG 3HUIRUPHGGLDJQRVWLFORJVWRFRQILUP72&LQDQQXOXV2EVHUYHGEULGJHDWIW0' 5,+DQGSHUIRUDWHGFDVLQJDWIW0'WRDWWHPSWHGWRHVWDEOLVKFLUFXODWLRQXQVXFFHVVIXOO\ 6HFWLRQPLOOHGFDVLQJIURP¶WR¶0'  :'3URSRVHG2SHUDWLRQV3URJUDP(Requirements of 20 AAC 25.015 (b)(2)) &LUFXODWHZHOOERUHFOHDQDQG722+ 38FOHDQRXWDVVHPEO\7,+DQGFRQGLWLRQZHOOERUHIRUFHPHQW722+ 38FHPHQWVWLQJHUDVVHPEO\DQG7,+WRERWWRPRIPLOOHGVHFWLRQDWIW0' 3XPSVSDFHUIROORZHGE\FHPHQWDQGGLVSODFHPHQWIOXLGWRVSRWDEDODQFHGFHPHQWSOXJ D(VWLPDWHG72&RI¶0' &LUFXODWHZHOOERUHFOHDQIURPWRSRIWKHFHPHQWSOXJ 722+DQGOD\GRZQFHPHQWVWLQJHU :2&XQWLOSVL8&$ 7,+DQGGUHVVRIIFHPHQWWR¶0'7DJDQGSUHVVXUHWHVWSOXJWRSVL1RWH1RWLI\$2*&& DQG(3$ (YDQ2VERUQHDW  722+ZLWKFOHDQRXW%+$ 7,+ZPHFKDQLFDOFDVLQJFXWWHUWRa¶0'3HUIRUPFDVLQJFXW 72+WR¶0'3HUIRUPVHFRQGFDVLQJFXW &LUFXODWHZHOOERUHRYHUWRSSJEULQH 722+ZLWKFXWWLQJWRROV &KDQJH835WR´IL[HGFDVLQJUDPVDQGSUHVVXUHWHVWWRSVLSVLIRUPLQ1RWH1RWLI\ $2*&& 58DQGDWWHPSWWRSXOO´FDVLQJIUHH 3XOO´FDVLQJWRVXUIDFHDQGOD\GRZQ 5,+Z'3DQGVSHDUWRSXOOUHPDLQLQJFDVLQJ 722+DQGOD\GRZQFDVLQJ 38´FHPHQWVWLQJHU 7,+ZVWLQJHUWR¶0' 3XPSVSDFHUIROORZHGE\EEOVRISSJFHPHQWDQGGLVSODFHPHQWIOXLGWRVSRWDEDODQFHGFHPHQWSOXJ 3XOORXWRISOXJDQGFLUFXODWHZHOOERUHFOHDQIURPWRSRIWKHFHPHQWSOXJ 722+DQGOD\GRZQFHPHQWVWLQJHU :2&XQWLOSVL8&$ 7,+ZLWKFOHDQRXW%+$DQGFOHDQRXWWR¶0'7DJDQGSUHVVXUHWHVWSOXJWRSVL1RWH1RWLI\ $2*&&DQG(3$ (YDQ2VERUQHDW  &LUFXODWHZHOOWR&RUURVLRQ,QKLELWHGSSJ%ULQH 722+WRVXUIDFH 38´%ULGJH3OXJ 7,+WR¶0'DQGVHWEULGJHSOXJ 322+OD\GRZQUXQQLQJWRROV 7,+ZLWK´'33XPSEEOVRISSJ$6FROGWHPSHUDWXUHFHPHQW 322+ZLWKZRUNVWULQJILOOLQJZLWKFHPHQW 1'%23,QVWDOO7$&DS5'02ULJ 7HVW %23( 1RWLI\ $2*&&97/   :'3URSRVHG6FKHPDWLF  1RWH%OXHDQGEODFNWH[WLVDFWXDO5HGWH[WLVSODQQHG Originated: Delivered to:8-Apr-22Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS #DIGITAL #1 CD3-127 50-103-20634-00 n/a Colville River Leak Detect Log Field- Final 19-Feb-22 0 12 WD-03 50-103-20835-00 907771752 Colville River Leak Detect Log with ACX Field & Processed 25-Mar-22 0 13 WD-03 50-103-20835-00 907771752 Colville River Leak Detect Log with ACX Field & Processed 30-Mar-22 0 14 WD-03 50-103-20835-00 907771752 Colville River CAST-M Record Field & Processed 31-Mar-22 0 15 WD-03 50-103-20835-00 907771752 Colville River CAST-M Record Field & Processed 31-Mar-22 0 16 WD-03 50-103-20835-00 907771752 Colville River Radial Bond Record Field- Final 29-Mar-22 0 17 WD-03 50-103-20835-00 907771752 Colville River Temperature Record Field- Final 31-Mar-22 0 18910PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:221-103T364642WD-0350-103-20835-003WD-0350-103-20835-004WD-0350-103-20835-005WD-0350-103-20835-006WD-0350-103-20835-007WD-0350-103-20835-00Meredith GuhlDigitally signed by Meredith Guhl Date: 2022.04.08 15:31:00 -08'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Rig 142 To:Regg, James B (OGC) Subject:RE: WD-03 AOGCC bop test form 4-3-22 Date:Tuesday, April 5, 2022 6:06:29 PM Attachments:image001.png The remarks are correct. We did test rams and valves to 5000psi. From: Regg, James B (OGC) <jim.regg@alaska.gov> Sent: Tuesday, April 5, 2022 5:48 PM To: Rig 142 <rig142@doyondrilling.com> Cc: Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Subject: RE: WD-03 AOGCC bop test form 4-3-22 Remarks say tested to 5000psi; I assume that is a typo Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: Rig 142 <rig142@doyondrilling.com> Sent: Monday, April 4, 2022 7:20 PM To: Regg, James B (OGC) <jim.regg@alaska.gov>; DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>; Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Subject: WD-03 AOGCC bop test form 4-3-22 Test form for 4-3-22 bop test. Matthew SaM Rig 142 Tourpusher Rig142@doyondrilling.com Doyon Rig 142 907-670-6002 Cell, 907-322-3715 CRU |WD-03 PTD 2211030 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor:Rig No.:142 DATE:4/3/22 Rig Rep.:Rig Phone:670-6002 Operator:Op. Phone:670-6001 Rep.:E-Mail Well Name:PTD #2211030 Sundry #322-186 Operation:Drilling:Workover:X Explor.: Test:Initial:Weekly:Bi-Weekly:X Other: Rams:250/5000 Annular:250/2500 Valves:250/5000 MASP:4128 MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 1 P Housekeeping P Rig P Lower Kelly 1 P PTD On Location P Hazard Sec.P Ball Type 2 P Standing Order Posted P Misc.NA Inside BOP 1 P FSV Misc 0 NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0 NA Trip Tank P P Annular Preventer 1 13-5/8 5M P Pit Level Indicators P P #1 Rams 1 3.5" x 6"P Flow Indicator P P #2 Rams 1 Blind/Shear P Meth Gas Detector P P #3 Rams 1 3.5'' x 6''P H2S Gas Detector P P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA Quantity Test Result Choke Ln. Valves 1 3-1/8'' 5M P Inside Reel valves 0 NA HCR Valves 2 3-1/8'' 5M P Kill Line Valves 1 3-1/8'' 5M P Check Valve 0 NA ACCUMULATOR SYSTEM: BOP Misc 0 NA Time/Pressure Test Result System Pressure (psi)3050 P CHOKE MANIFOLD:Pressure After Closure (psi)1800 P Quantity Test Result 200 psi Attained (sec)8 P No. Valves 14 P Full Pressure Attained (sec)58 P Manual Chokes 1 P Blind Switch Covers:All stations Yes Hydraulic Chokes 1 P Nitgn. Bottles # & psi (Avg.):#6@ 2000 P CH Misc 0 NA ACC Misc 0 NA Test Results Number of Failures:0 Test Time:6.5 Hours Repair or replacement of equipment will be made within days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 4-1-22 / 08:44 Waived By Test Start Date/Time:4/3/2022 13:30 (date)(time)Witness Test Finish Date/Time:4/3/2022 20:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Austin McLeod Doyon Test Annular to 3500psi w/ 3½ & 4" Test jt, Test Rams #1 & #3 w/ both 3.5" & 4" test jts, all test 250-lo, 5000-Hi 5min ea. On chart. All rams functioned from both primary & remote controls, upper/lower IBOP, 2-4"fosv, 1- 4"dart valves, Test all gas, H2S, Flow & PVT alarms both audible & visual, Drawdown conducted with 2-air & 2-elec pumps. B.Marmon / M.Sam CPAI M.Tucker / J.Benedict CRU WD-03 Test Pressure (psi): rig142@doyondrilling.com Form 10-424 (Revised 02/2022)2022-0403_BOP_Doyon142_CRU_WD-03        J. Regg; 4/5/2022 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________COLVILLE RIV UNIT WD-03 JBR 04/04/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:0 Tested all gas alarms and PVT's, Tested with 3 1/2" and 4 1/2" test joints. 16 precharge bottles all at 1000psi, Closer Times: Annulas = 10sec, UPR, LPR and blinds all = 5 sec. each and both HCR's = 2 sec each. GOOD TEST Test Results TEST DATA Rig Rep:Frank CarloOperator:ConocoPhillips Alaska, Inc.Operator Rep:Matt Shotenski Contractor/Rig No.:Doyon 142 PTD#:2211030 DATE:3/22/2022 Type Operation:WRKOV Annular: 250/4500Type Test:INIT Valves: 250/4500 Rams: 250/4500 Test Pressures:Inspection No:bopBDB220323073525 Inspector Brian Bixby Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 6 MASP: 4128 Sundry No: 322-140 Location Gen.:P Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec.P Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 2 P Inside BOP 1 P FSV Misc 0 NA 14 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13 5/8 P #1 Rams 1 3 1/2 x 6 P #2 Rams 1 Blind/Shear P #3 Rams 1 3 1/2 x 6 P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3 1/8 P HCR Valves 2 3 1/8 P Kill Line Valves 1 3 1/8 P Check Valve 0 NA BOP Misc 0 NA System Pressure P3000 Pressure After Closure P1650 200 PSI Attained P11 Full Pressure Attained P70 Blind Switch Covers:PYES Nitgn. Bottles (avg):P6@1983 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 0 NA 9 9 9 9 9 9 9 9 9 9 9 Annulas = 10sec, UPR, LPR and blinds all = 5 sec. each and both HCR's = 2 sec each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y Samantha Carlisle at 6:13 pm, Apr 01, 2022  'LJLWDOO\VLJQHGE\*UHJ+REEV '12 :HOOV&1 *UHJ+REEV ( JUHJVKREEV#FRQRFRSKLOOLSVFRP 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ *UHJ +REEV %23 WHVW SUHVVXUH WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ &RQGLWLRQV RI DSSURYDO RQ RULJLQDO 37' DSSO\ ; ; ; 97/  97/  ILOH Z 37'   ; $YDULDQFH WR  $$&  D  LV JUDQWHG WR DOORZ D  IRRW RSHQ KROH FHPHQW SOXJ WR EH SODFHG a DERYH WKH WRS RI WKH & +DOR  $$&  M  GWV  Jeremy Price Digitally signed by Jeremy Price Date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±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equirements of 20 AAC 25.015 (b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y Samantha Carlisle at 1:49 pm, Mar 30, 2022  'LJLWDOO\VLJQHGE\(ULFD/LYLQJVWRQ '128 :HOOV&KLHI(QJU2 &RQRFR3KLOOLSV $ODVND,QF&1 (ULFD/LYLQJVWRQ ( HULFDMOLYLQJVWRQ#FRQRFRSKLOOLSVFRP 5HDVRQ,DPDSSURYLQJWKLVGRFXPHQW /RFDWLRQ$QFKRUDJH$. 'DWH  )R[LW3')(GLWRU9HUVLRQ (ULFD /LYLQJVWRQ ; ILOH Z 37'  %23 SUHVVXUH WHVW WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ &RQGLWLRQV RI $SSURYDO RQ RULJLQDO 37' DSSO\ ; ; '656)'97/ GWV  -/&  Jeremy Price Digitally signed by Jeremy Price Date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±IW0'DQGSSJEULQH FLUFXODWHGLQWRWKHLQ[LQDQQXOXV7KHZHOOKDVEHHQFRQILUPHGVWDWLFERWKYLDZHOOERUHPRQLWRULQJ DQGYLDDQDFRXVWLFORJWKDWFRQILUPHGQRIOXLGIORZEHKLQGWKHLQFDVLQJ+RZHYHUIOXLGUHWXUQVKDYHQRW FRPHWRVXUIDFHRQWKHRXWHUDQQXOXV 2$ ZKLFKFDXVHVDQHHGWRFKDQJHWKHEDVHSODQIRUVRXUFHUHPHGLDWLRQ  :'&XUUHQW6FKHPDWLF      3ULRU2SHUDWLRQV  3XOOHGLQOLQHU 3HUIRUPHGIXOO%23WHVW $2*&&ZLWQHVVHG  $EDQGRQHGGLVSRVDO]RQHDQGORZHUSRUWLRQRIZHOOERUHZLWKFHPHQWDQGEULGJHSOXJWR¶0' 3HUIRUDWHGLQFDVLQJDQGFLUFXODWHSSJEULQHLQWRRXWHUDQQXOXV 3HUIRUPHGGLDJQRVWLFORJVWRFRQILUPQRIORZEHKLQGLQFDVLQJ  :'3URSRVHG2SHUDWLRQV3URJUDP(Requirements of 20 AAC 25.015 (b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¶0'RUVKDOORZHU  SXPSLQWHUQDOFHPHQWSOXJWRKHLJKWHTXLYDOHQWWRWRSRI2$FHPHQWWRDEDQGRQZHOOWRDERYHWRS RI&+DORLQWHUYDO F,IWRSRIFHPHQWLVOHVVWKDQIWDERYHWKHWRSRI&+DORLQWHUYDO GHHSHUWKDQ¶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y Samantha Carlisle at 12:11 pm, Mar 23, 2022  'LJLWDOO\VLJQHGE\(ULFD/LYLQJVWRQ '128 :HOOV&KLHI(QJU2 &RQRFR3KLOOLSV$ODVND,QF &1 (ULFD/LYLQJVWRQ( HULFDMOLYLQJVWRQ#FRQRFRSKLOOLSVFRP 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ (ULFD/LYLQJVWRQ ; ; ; %23( WHVW WR  SVLJ $QQXODU SUHYHQWHU WHVW WR  SVLJ $OO FRQGLWLRQV RI DSSURYDO LQ RULJLQDO 37' DQG 6XQGU\  DSSO\ '/%  97/  ; &':  ILOH Z 37'   -/&  Jeremy Price Digitally signed by Jeremy Price Date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tͲϬϯǁĂƐƐŚƵƚͲŝŶĚƵĞƚŽƚŚĞŐĂƐƌĞůĞĂƐĞŽŶϭƉĂĚǁŚŝůĞƌƵŶŶŝŶŐϱͲϭͬϮ͟ƉƌŽĚƵĐƚŝŽŶůŝŶĞƌ͘dŚĂƚůŝŶĞƌŚĂƐďĞĞŶ ƉƵůůĞĚĨƌŽŵƚŚĞǁĞůů͘hƉĐŽŵŝŶŐŽƉĞƌĂƚŝŽŶƐƚŽĂďĂŶĚŽŶƚŚĞŽƉĞŶƉ ƌŽĚƵĐƚŝŽŶŚŽůĞǁĞƌĞĐŽǀĞƌĞĚďLJ^ƵŶĚƌLJηϯϮϮͲ ϭϰϬ͘ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨŽƉĞƌĂƚŝŽŶƐĐŽǀĞƌĞĚŝŶƚŚŝƐƐƵŶĚƌLJ͕tͲϬϯǁŝůůďĞƐŚƵƚͲŝŶǁŝƚŚƚŚĞƉƌŽĚƵĐƚŝŽŶŚŽůĞ ƐƵƐƉĞŶĚĞĚǀŝĂĐĞŵĞŶƚƌĞƚĂŝŶĞƌĂŶĚĐĞŵĞŶƚƉůƵŐ;ƉĞŶĚŝŶŐƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚǁŝƚŶĞƐƐďLJK'Ϳ͕ĂŶĚ ĚŝĂŐŶŽƐƚŝĐƐǁŝůůŚĂǀĞďĞĞŶƌƵŶƚŽĚĞƚĞƌŵŝŶĞƚŚĞƐŽƵƌĐĞŽĨƚŚĞŐĂƐĨůŽǁŝŶŐƵƉƚŚĞtͲϬϯĂŶŶƵůƵƐ͘  :'3ODQQHG6FKHPDWLF DWHQGRIRSHUDWLRQVFRYHUHGE\6XQGU\         3ULRU2SHUDWLRQV FRYHUHGLQ6XQGU\   ϭ͘WƵůůϱͲϭͬϮŝŶ͘ůŝŶĞƌ Ϯ͘WĞƌĨŽƌŵĨƵůůKWƚĞƐƚ;K'ǁŝƚŶĞƐƐͿ ϯ͘ďĂŶĚŽŶŽƉĞŶŚŽůĞƉŽƌƚŝŽŶŽĨǁĞůůďŽƌĞǁŝƚŚĐĞŵĞŶƚƌĞƚĂŝŶĞƌĂŶĚĐĞŵĞŶƚƉůƵŐƚŽΕϴϵϴϬĨƚD ϰ͘WĞƌĨŽƌŵĚŝĂŐŶŽƐƚŝĐůŽŐƐƚŽŝĚĞŶƚŝĨLJŐĂƐƐŽƵƌĐĞ  :'3URSRVHG2SHUDWLRQV3URJUDP(Requirements of 20 AAC 25.015 (b)(2)) ϭ͘ĨƚĞƌĐŽŵƉůĞƚŝŶŐǁŝƌĞůŝŶĞĚŝĂŐŶŽƐƚŝĐƐ͕ĚĞƚĞƌŵŝŶĞƐŽƵƌĐĞnjŽŶĞŽĨŐĂƐĨůŽǁŝŶŐƵƉKƵƚĞƌŶŶƵůƵƐ;KͿ͘ Ϯ͘ZƵŶŝŶ,ŽůĞ;Z/,ͿǁŝƚŚϯͲϭͬϮŝŶ͘ĐĞŵĞŶƚƐƚŝŶŐĞƌŽŶĂĚŝƐĐŽŶŶĞĐƚƚŽŽůƚŽĂďĂŶĚŽŶůŽǁĞƌƉŽƌƚŝŽŶŽĨƚŚĞϳͲϱͬϴ ŝŶ͘ŝŶƚĞƌŵĞĚŝĂƚĞĐĂƐŝŶŐĨƌŽŵƚŽƉŽĨĞdžŝƐƚŝŶŐĐĞŵĞŶƚƉůƵŐĂƚΕϴϵϴϬĨƚDƚŽΕϰϭϬϬĨƚD;ŵŝŶŝŵƵŵ ƌĞƋƵŝƌĞĚŝƐϭϬϬĨƚDĂďŽǀĞƚŽƉŽĨ<ϯĂƐĂůnjŽŶĞͿ ϯ͘dĂŐƚŽƉŽĨŽƉĞŶŚŽůĞĂďĂŶĚŽŶŵĞŶƚƉůƵŐĂƚΕϴϵϴϬĨƚD͘WĞƌĨŽƌŵƉƌĞƐƐƵƌĞƚĞƐƚŽŶƚŚĞŽƉĞŶŚŽůĞ ĂďĂŶĚŽŶŵĞŶƚƉůƵŐƚŽϮϮϬϬƉƐŝ;Ϭ͘ϮϱƉƐŝͬĨƚΎϴϮϵϬĨƚdsсϮϬϳϯƉƐŝĂƐƌĞƋƵŝƌĞĚďLJϮϬϮϱ͘ϭϭϮ;ŐͿ;ϮͿͿ͘ WƌŽǀŝĚĞϰϴŚŽƵƌŶŽƚŝĨŝĐĂƚŝŽŶĨŽƌK'ǁŝƚŶĞƐƐŽĨƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘ ϰ͘WƵŵƉĐĞŵĞŶƚĂƌŽƵŶĚϯͲϭͬϮŝŶ͘ĐĞŵĞŶƚƐƚŝŶŐĞƌƚŽĂĚĞƉƚŚŽĨΕϰ͕ϭϬϬĨƚD͕ůĞĂǀŝŶŐĐĞŵĞŶƚĂƚƚŚĞƐĂŵĞ ŚĞŝŐŚƚŝŶƐŝĚĞƐƚŝŶŐĞƌ͘ ϱ͘ŝƐĐŽŶŶĞĐƚĨƌŽŵϯͲϭͬϮŝŶ͘ƐƚŝŶŐĞƌ͕WhΕϭϬĨƚĂŶĚĐŝƌĐƵůĂƚĞǁĞůůďŽƌĞĐůĞĂŶ͘WƵůůKƵƚKĨ,ŽůĞ;WKK,ͿĂŶĚ ǁĂŝƚŽŶĐĞŵĞŶƚ͘ ϲ͘Z/,ǁŝƚŚϲͲϯͬϰŝŶ͘ĐůĞĂŶŽƵƚĂƐƐĞŵďůLJƚŽƚŽƉŽĨĂďĂŶĚŽŶŵĞŶƚƉůƵŐĂƚΕϰϭϬϬĨƚD͘dĂŐĂďĂŶĚŽŶŵĞŶƚƉůƵŐ ĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚƚŽϭϱϬϬƉƐŝ;ĂƐƌĞƋƵŝƌĞĚďLJϮϬϮϱ͘ϭϭϮ;ŐͿ;ϮͿͿ͘WƌŽǀŝĚĞϰϴŚŽƵƌŶŽƚŝĐĞƚŽK'ĨŽƌ ǁŝƚŶĞƐƐŽĨƚĂŐĂŶĚƉƌĞƐƐƵƌĞƚĞƐƚ͘WKK,ĂŶĚ>ĂLJŽǁŶ;>ͿĐůĞĂŶŽƵƚĂƐƐĞŵďůLJ͘ ϳ͘Z/,ĂŶĚƐĞƚďƌŝĚŐĞƉůƵŐĂƚΕϯϲϬϬĨƚD;ΕϭϬϬĨƚďĞůŽǁƚŽƉŽĨϳͲϱͬϴŝŶ͘ƐƚĂŐĞϮĐĞŵĞŶƚũŽďĂƐǀĞƌŝĨŝĞĚďLJ ƉƌĞǀŝŽƵƐh^/důŽŐͿ͘ ϴ͘ŝƐƉůĂĐĞǁĞůůƚŽϭϬ͘ϬƉƉŐďƌŝŶĞ͘ ϵ͘Z/,ǁŝƚŚdWŐƵŶƐǁŝƚŚĐŝƌĐƵůĂƚŝŶŐƐƵďĂďŽǀĞĂŶĚƉĞƌĨŽƌĂƚĞϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐĂƚΕϯ͕ϰϱϬĨƚD;ΕϰϬĨƚD ĂďŽǀĞƚŽƉŽĨϳͲϱͬϴŝŶ͘ƐƚĂŐĞϮĐĞŵĞŶƚͿ͘ ϭϬ͘ŝƌĐƵůĂƚĞǁĞůůŽǀĞƌƚŽϭϬ͘ϬƉƉŐďƌŝŶĞƚŚƌŽƵŐŚĐŝƌĐƵůĂƚŝŶŐƐƵďƵŶƚŝůϭϬ͘ϬƉƉŐĨůƵŝĚŝƐƌĞƚƵƌŶĞĚƚŽƐƵƌĨĂĐĞ ƚŚƌŽƵŐŚƚŚĞKǀĂůǀĞƐ͘ ϭϭ͘^ŚƵƚͲŝŶĂŶĚŵŽŶŝƚŽƌǁĞůůƚŽĐŽŶĨŝƌŵƉĂĚĐŽŶĚŝƚŝŽŶƐĂƌĞƐƚĂďůĞŽŶĐĞtͲϬϯKĨůŽǁŚĂƐƐƚŽƉƉĞĚ͘ ϭϮ͘WKK,ĂŶĚ>ƉĞƌĨŽƌĂƚŝŶŐŐƵŶƐ͘ ϭϯ͘ZŝŐhƉ;ZhͿǁŝƌĞůŝŶĞĂŶĚƉĞƌĨŽƌŵĚŝĂŐŶŽƐƚŝĐůŽŐƚŽĐŽŶĨŝƌŵƐŽƵƌĐĞŚĂƐďĞĞŶĐŽŶƚƌŽůůĞĚĂŶĚŶŽĨůŽǁŝƐ ŽďƐĞƌǀĞĚďĞŚŝŶĚϳͲϱͬϴ͟ĐĂƐŝŶŐ͘ ϭϰ͘DĂŬĞhƉ;DhͿĂŶĚZ/,ǁŝƚŚϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐĐƵƚƚĞƌŽŶƌŝůůWŝƉĞ;WͿ͘ƵƚϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐĂƚΕϯϰϰϬĨƚD ;ϱϬĨƚDĂďŽǀĞƚŽƉŽĨϳͲϱͬϴŝŶ͘ƐƚĂŐĞϮĐĞŵĞŶƚ͕ΕϮϰϬĨƚDďĞůŽǁďĂƐĞŽĨͲϭϬnjŽŶĞͿ Ă͘ƵƚĐĂƐŝŶŐǁŝůůĂůůŽǁĨŽƌƌŽƚĂƚŝŽŶĚƵƌŝŶŐƌĞŵĞĚŝĂůĐĞŵĞŶƚũŽď͕ƉƌŽǀŝĚŝŶŐďĞƐƚƉŽƐƐŝďůĞĐĞŵĞŶƚ ĐŽǀĞƌĂŐĞĂĐƌŽƐƐƐŽƵƌĐĞnjŽŶĞ͘ ϭϱ͘WKK,ĂŶĚ>ĐƵƚƚĞƌ͘ůŽƐĞďůŝŶĚƌĂŵƐĂŶĚĐŚĂŶŐĞŽƵƚϯͲϭͬϮŝŶ͘džϲŝŶ͘sZƐĨŽƌϳͲϱͬϴŝŶ͘ƐŽůŝĚďŽĚLJƌĂŵƐ ĂŶĚƚĞƐƚϳͲϱͬϴŝŶ͘ƌĂŵƐ͘WƌŽǀŝĚĞϰϴŚŽƵƌŶŽƚŝĨŝĐĂƚŝŽŶĨŽƌK'ǁŝƚŶĞƐƐŽĨƚĞƐƚ͘ ϭϲ͘WƵůůĂŶĚ>ϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐŚĂŶŐĞƌ ϭϳ͘DhϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐũŽŝŶƚǁŝƚŚĐĂƐŝŶŐƌƵŶŶŝŶŐƚŽŽůĂŶĚƐƉĂĐĞŽƵƚŽŶĚĞƉƚŚ ϭϴ͘ZŝŐƵƉĞͲůŝŶĞ͕Z/,ĂŶĚƐĞƚƉĂĐŬĞƌǁŝƚŚĨůŽĂƚĂƐƐĞŵďůLJΕϱϬ͛ĂďŽǀĞƚŚĞĐĂƐŝŶŐĐƵƚ͘ ϭϵ͘ƐƚĂďůŝƐŚĐŝƌĐƵůĂƚŝŽŶĚŽǁŶϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐ͘ ϮϬ͘WƵŵƉĐĞŵĞŶƚũŽďǁŝƚŚϭϮ͘ϬƉƉŐĐĞŵĞŶƚ͕ďƌŝŶŐŝŶŐĐĞŵĞŶƚƚŽϭϵϬϬĨƚDǁŚŝůĞƌŽƚĂƚŝŶŐĐĂƐŝŶŐ͘>ĞĂǀĞΕϳϱ͛ ŽĨĐĞŵĞŶƚŽŶƚŽƉŽĨƉĂĐŬĞƌͬĨůŽĂƚĂƐƐĞŵďůLJ͘ Ϯϭ͘tĂŝƚŽŶĐĞŵĞŶƚ͘WƵůůĐĂƐŝŶŐŝŶƚŽƚĞŶƐŝŽŶĂŶĚƐĞƚŽŶϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐƐůŝƉƐ͘^ĞƚĂŶĚƚĞƐƚƉĂĐŬŽĨĨ͘ ϮϮ͘Z/,ǁŝƚŚϲͲϯͬϰŝŶ͘ĐůĞĂŶŽƵƚĂƐƐĞŵďůLJ͘dĂŐƚŽƉŽĨĐĞŵĞŶƚŝŶƐŝĚĞϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐĂŶĚƚĞƐƚƚŽϭϱϬϬƉƐŝ;ĂƐ ƌĞƋƵŝƌĞĚďLJϮϬϮϱ͘ϭϭϮ;ŐͿ;ϮͿͿ͘WƌŽǀŝĚĞϰϴŚŽƵƌŶŽƚŝĨŝĐĂƚŝŽŶĨŽƌK'ǁŝƚŶĞƐƐŽĨƚĂŐĂŶĚƉƌĞƐƐƵƌĞ ƚĞƐƚ͘EŽƚĞ͗ƚŚŝƐŝƐŶŽƚĂWΘĐĞŵĞŶƚũŽď͘  Ϯϯ͘ZhĂŶĚZ/,ǁŝƚŚǁŝƌĞůŝŶĞ͘WĞƌĨŽƌŵh^/důŽŐƚŽǀĞƌŝĨLJĐĞŵĞŶƚƋƵĂůŝƚLJďĞŚŝŶĚϳͲϱͬϴŝŶ͘ĐĂƐŝŶŐ͘WKK,ĂŶĚ ZǁŝƌĞůŝŶĞ͘ Ϯϰ͘DhĂŶĚZ/,ǁŝƚŚϰͲϭͬϮŝŶ͘ƵƉƉĞƌĐŽŵƉůĞƚŝŽŶƚŽΕϮ͕ϬϬϬĨƚD;ĞdžĂĐƚĚĞƉƚŚdͿ͘ƌŽƉďĂůůĂŶĚƌŽĚ͘ WƌĞƐƐƵƌĞƵƉƚŽƐĞƚƉĂĐŬĞƌ͘ Ϯϱ͘WƌĞƐƐƵƌĞƚĞƐƚƚƵďŝŶŐĂŶĚƚƵďŝŶŐdžĐĂƐŝŶŐ/ŶŶĞƌŶŶƵůƵƐ;/ͿƚŽϭϱϬϬƉƐŝ͘ Ϯϲ͘^ŚĞĂƌ^ŚĞĂƌKƵƚsĂůǀĞ;^KsͿ͘/ŶƐƚĂůůĂĐŬWƌĞƐƐƵƌĞsĂůǀĞ;WsͿĂŶĚƚĞƐƚĨƌŽŵďĞůŽǁ͘ Ϯϳ͘EŝƉƉůĞŽǁŶ;EͿKWĂŶĚEŝƉƉůĞhƉ;EhͿƚƌĞĞĂŶĚƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌĂƐƐĞŵďůLJ͘WƌĞƐƐƵƌĞƚĞƐƚ ĂĚĂƉƚĞƌ͘/ŶƐƚĂůůWsĚĂƌƚ͕ĂŶĚƚĞƐƚƚƌĞĞ͘ Ϯϴ͘WƵůůWsĂŶĚĨƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂŶĚ/ƚŽϭ͕ϴϬϬĨƚǁŝƚŚĚŝĞƐĞů͘ Ϯϵ͘^ĞĐƵƌĞǁĞůů͘ZŝŐĚŽǁŶĂŶĚŵŽǀĞŽĨĨ͘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y Samantha Carlisle at 8:45 am, Mar 17, 2022  'LJLWDOO\VLJQHGE\*UHJ+REEV '12 :HOOV&1 *UHJ+REEV ( JUHJVKREEV#FRQRFRSKLOOLSVFRP 5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW /RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH 'DWH  )R[LW3')(GLWRU9HUVLRQ *UHJ+REEV DSR-3/17/22VTL 3/18/2022 BOP pressure test to 4500 psig Annular preventer test to 2500 psig SFD 3/17/2022 X NO X  X Conditions of Approval on original PTD apply. file with PTD 10-407 CDW 3/17/2022 VTL 3/17/22 X X DLB 03/17/2022  JLC 3/18/2022 Jeremy Price Digitally signed by Jeremy Price Date: 2022.03.18 15:05:47 -08'00' RBDMS SJC 032322 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Hobbs, Greg S To:Loepp, Victoria T (OGC) Cc:CPAI Liaison Officer; Livingston, Erica J; ancimtops; Callahan, Mike S; Smith, Matt Subject:RE: WD-03 (PTD 221-103) Sundry to Change Approved Program Date:Thursday, March 17, 2022 5:50:40 PM Victoria, Sorry for the late response. Regarding this sundry request, current plan is to pressure test the plug after logging, first operation of the next sundry, and tag the plug as the well is swapped to a weighted brine in later operations of the next sundry. We understand that both operations require an AOGCC witness. Greg From: Hobbs, Greg S Sent: Thursday, March 17, 2022 9:10 AM To: AOGCC Permitting (CED sponsored) <aogcc.permitting@alaska.gov> Cc: ancimtlno <ancimtlno@conocophillips.com>; Livingston, Erica J <Erica.J.Livingston@conocophillips.com>; ancimtops <ancimtops@conocophillips.com> Subject: WD-03 (PTD 221-103) Sundry to Change Approved Program Attached, please find the correct post sundry schematic for this submission. Greg Greg Hobbs, P.E. Regulatory Engineer | Wells Team ConocoPhillips Alaska Inc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´SURGXFWLRQOLQHU7KHOLQHUZDVSLFNHG XSDORQJZLWKVWDQGRI´+:'3DQGVWDQGRI´'3ZKHQWKHZHOOZDVVKXWLQ'LHVHOIUHH]HSURWHFWZDV FLUFXODWHGDURXQGWKHOLQHUZLWKZDWHUEDVHGPXGLQWKHUHPDLQGHURIWKHZHOOERUHEHORZ7KHSURGXFWLRQKROHLV RSHQEHORZWKHLQWHUPHGLDWHVKRH  :'&XUUHQW6FKHPDWLF       :'3URSRVHG2SHUDWLRQV3URJUDP(Requirements of 20 AAC 25.015 (b)(2)) ϭ͘ĂƌƌLJŽƵƚŝŶƐƉĞĐƚŝŽŶŽĨƌŝŐǁŝƚŚK'ǁŝƚŶĞƐƐ͘ Ϯ͘&ƵŶĐƚŝŽŶƚĞƐƚĂůůKWĐŽŵƉŽŶĞŶƚƐĞdžĐĞƉƚĨŽƌďůŝŶĚͬƐŚĞĂƌƌĂŵƐ͘ ϯ͘ƐƚĂďůŝƐŚĐŝƌĐƵůĂƚŝŽŶĂŶĚĐŝƌĐƵůĂƚĞŽƵƚĚŝĞƐĞůĨƌĞĞnjĞƉƌŽƚĞĐƚǁŝƚŚϭϬ͘ϬƉƉŐ>^EtD͘ ϰ͘WKK,ĂŶĚůĂLJĚŽǁŶϱͲϭͬϮ͟ůŝŶĞƌ͘ ϱ͘WƵůůǁĞĂƌďƵƐŚŝŶŐ͕ƐĞƚƚĞƐƚƉůƵŐĂŶĚƉĞƌĨŽƌŵĨƵůůKWƚĞƐƚ͘ ϲ͘Z/,ǁͬĐĞŵĞŶƚƌĞƚĂŝŶĞƌŽŶϰ͟W͘ ϳ͘^ĞƚĐĞŵĞŶƚƌĞƚĂŝŶĞƌĂƚΕϵϮϬϬ͛D;ϲϱ͛ŝŶƐŝĚĞϳͲϱͬϴ͟ŝŶƚĞƌŵĞĚŝĂƚĞĐĂƐŝŶŐƐŚŽĞͿ ϴ͘WƌĞƐƐƵƌĞƚĞƐƚĂŶŶƵůƵƐĂďŽǀĞƌĞƚĂŝŶĞƌ͘WĞƌĨŽƌŵŝŶũĞĐƚŝǀŝƚLJƚĞƐƚ͘ZĞĐŽƌĚWhͬ^KǁĞŝŐŚƚƐƚŽĐŽŶĨŝƌŵƌĞƚĂŝŶĞƌ ŝƐƐĞƚ͘ ϵ͘ZĞůĞĂƐĞĨƌŽŵƌĞƚĂŝŶĞƌĂŶĚĞƐƚĂďůŝƐŚĐŝƌĐƵůĂƚŝŽŶ͘ ϭϬ͘ZŝŐƵƉĂŶĚƉƵŵƉϮϬďďůĐĞŵĞŶƚũŽď͘ Ă͘^ƚŝŶŐŝŶƚŽƌĞƚĂŝŶĞƌǁŚĞŶĐĞŵĞŶƚŝƐΕϭϬďďůƐĨƌŽŵĞŶĚŽĨW͘ ď͘WƵŵƉƵŶƚŝůϭϱďďůƐŽĨĐĞŵĞŶƚŝƐďĞůŽǁƌĞƚĂŝŶĞƌʹǀŽůƵŵĞƚŽĐŽǀĞƌϳͲϱͬϴ͟ĐĂƐŝŶŐƐŚŽĞďĞůŽǁ ƌĞƚĂŝŶĞƌĂŶĚΕϮϳϬ͛ŽĨŽƉĞŶŚŽůĞďĞůŽǁƐŚŽĞ͘ Đ͘hŶͲƐƚŝŶŐĨƌŽŵƌĞƚĂŝŶĞƌĂŶĚůĞĂǀĞƌĞŵĂŝŶŝŶŐϱďďůƐŽĨĐĞŵĞŶƚŽŶƚŽƉŽĨƌĞƚĂŝŶĞƌ;ΕϭϭϬ͛ŽĨĐĞŵĞŶƚͿ͘ ϭϭ͘WƵůůĂďŽǀĞƚŽƉŽĨĐĞŵĞŶƚ͕ĐŝƌĐƵůĂƚĞǁĞůůďŽƌĞĐůĞĂŶ͕ĂŶĚWKK,ǁͬϰ͟W͘ ϭϮ͘ZŝŐƵƉͲůŝŶĞĂŶĚƉĞƌĨŽƌŵůŽŐŐŝŶŐƌƵŶƐŽǀĞƌŝŶƚĞƌŵĞĚŝĂƚĞŚŽůĞŝŶƚĞƌǀĂů͘ Ă͘ZƵŶĂĐŽƵƐƚŝĐůŽŐĨƌŽŵƐƵƌĨĂĐĞƚŽϱ͕ϬϬϬ͛D;ďĞůŽǁYĂŶŶŝŬŝŶƚĞƌǀĂůͿǁŝƚŚKĐŽŶƚŝŶƵŝŶŐƚŽĨůŽǁ͘ ď͘/ŶǀĞƐƚŝŐĂƚĞĂŶLJĂĐŽƵƐƚŝĐĂŶŽŵĂůŝĞƐĂŶĚƌĞůŽŐ͘ Đ͘^ŚƵƚŝŶKĂŶĚŵĂŬĞĚLJŶĂŵŝĐƉĂƐƐĨƌŽŵƐƵƌĨĂĐĞƚŽϱ͕ϬϬϬ͛D͘ Ě͘/ŶǀĞƐƚŝŐĂƚĞƉŽŝŶƚƐŽĨŝŶƚĞƌĞƐƚĨƌŽŵĨůŽǁŝŶŐƐƵƌǀĞLJŽƌŶĞǁĂŶŽŵĂůŝĞƐŝĚĞŶƚŝĨŝĞĚĚƵƌŝŶŐƐŚƵƚŝŶƉĂƐƐ Ğ͘WKK,ĂŶĚůĂLJĚŽǁŶƚŽŽůƐ͕ƌŝŐĚŽǁŶͲůŝŶĞ͘ ϭϯ͘^ƵďƐĞƋƵĞŶƚƐƚĞƉƐƚŽďĞĐŽǀĞƌĞĚŝŶƐĞƉĂƌĂƚĞƐƵŶĚƌLJĂƉƉůŝĐĂƚŝŽŶ͘   VTL 3/17/22 AOGCC witness. AOGCC witnessed tag and pressuretest required. VTL 3/17/22 VTL 3/17/22 AOGCC witness. . WD-03 Proposed Schematic 6-¾” Production Hole 10636' MD / 9946' TVD 20" 91.5# A-53 Welded Conductor to 120' 16" Surface Hole 13-3/8" 68# L-80 Hyd563 Surface Casing @ 22* 2434' MD / 2338' TVD 7 5/8" 29.7# L-80 TXP Intermediate Casing 9268' MD / 8578' TVD 9-7/8" Intermediate Rathole 9,383' MD / 8,693' TVD Alpine C – Oil Zone 7738' MD / 7059' TVD Kingak – Barrier 7848' MD / 7167' TVD Sag – Injection Zone 9437' MD / 8747' TVD Shublik – Barrier 9475' MD / 8786' TVD Ivishak – Injection Zone 9889' MD / 9199' TVD Kuparuk C – Oil Zone 7585' MD / 6912' TVD Top of Cement +/- 6252' MD / 5713' TVD (500' MD above Nanuk) Cementing stage tool 7-5/8" 29.7# Hyd563 4500' MD / 4184' TVD Qannik – Oil/Gas Zone 4337' MD / 4042' TVD Top of Cement +/- 3490' MD / 3289' TVD (500' MD above K3 Basal) K3 Basal – Oil/Gas Zone 4299' MD / 4008' TVD HRZ 7304' MD / 6647' TVD TVD Reference Mean Sea Level 58.50 ft Nanuq 6798' MD / 6192' TVD 5-½” 15.5# L-80 Hyd511 Production Liner + 1 stand 4"HWDP + 1 stand 4" DP to 1,765' WD-03 Proposed 3-16-22 C30 2562' MD / 2421' TVD C20 2916' MD / 2773' TVD C10 / Halo 3193' MD / 3023' TVD 13.5ppg mud cap - 2219'MD/2144' TVD 12.4ppg gel pill - 2808'MD/2675' TVD 10ppg fluid - Remaning Retainer Top of Cement 9090' MD / 8399’ TVD Cement Retainer 9200' MD / 8510' TVD Base of Cement 9535' MD / 8856’ TVD STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSu b m i t t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:142 DATE: 2/27/22 Rig Rep.: Rig Phone: 670-6002 Operator: Op. Phone:670-6001 Rep.: E-Mail Well Name: PTD #22211030 Sundry # Operation: Drilling: X Workover: Explor.: Test: Initial: Weekly: Bi-Weekly: X Other: Rams:250/4500 Annular:250/2500 Valves:250/4500 MASP:4128 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 1P Housekeeping P Rig P Lower Kelly 1P PTD On Location P Hazard Sec.P Ball Type 1P Standing Order Posted P Misc.NA Inside BOP 1P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13-5/8 5M P Pit Level Indicators PP #1 Rams 1 3.5" x 6"P Flow Indicator PP #2 Rams 1 Blind/Shear P Meth Gas Detector PP #3 Rams 1 3.5'' x 6''P H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 3-1/8'' 5M P Inside Reel valves 0NA HCR Valves 2 3-1/8'' 5M P Kill Line Valves 1 3-1/8'' 5M P Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 0 NA Time/Pressure Test Result System Pressure (psi)3025 P CHOKE MANIFOLD:Pressure After Closure (psi)1725 P Quantity Test Result 200 psi Attained (sec)7 P No. Valves 14 P Full Pressure Attained (sec)58 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): #6@2003 P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:0 Test Time:5.5 Hours Repair or replacement of equipment will be made within days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 2/24/22 3:14p.m. Waived By Test Start Date/Time:2/27/2022 5:30 (date) (time)Witness Test Finish Date/Time:2/27/2022 11:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Bob Noble Doyon Test Annular to 2500psi (Both test jts), Test Rams #1 & #3 with 4" & 5.5" test jts. Test one ea. 4" FOSV & Dart, All tests 250-lo/ 4500-Hi 5min ea. On chart. All rams functioned from both primary & remote controls, Test all gas, H2S, Flow & PVT alarms both audible & visual, Drawdown conducted with 2-air & 2-elec pumps. F.Carlo/M.Sam CPAI M.Tucker/J.Benedict CRU WD-03 Test Pressure (psi): rig142@doyondrilling.com Form 10-424 (Revised 02/2022) 2022-0227_BOP_Doyon142_CRU_WD-03 9 9 9 9 9 9 9 -%5 2/27/22 STATE OF ALASKA Reviewed By: j7,4 - OIL AND GAS CONSERVATION COMMISSION P.I. Supry Z ZS ?t BOPE Test Report for: COLVILLE RIV UNIT WD -03 ' Comm Contractor/Rig No.: Doyon 142 -' PTD#: 2211030 ' DATE: 2/3/2022 - Inspector Bob Noble Insp Source Operator: ConocoPhillips Alaska, Inc. Operator Rep: Adam Dorr Rig Rep: F Carlo Inspector Type Operation: DRILL Sundry No: Test Pressures: Inspection No: bopRCN220209144521 Rams: Annular: Valves: MASP: Type Test: INIT / 250/5000 250/3500- 250/5000' 4128 Related Insp No: FLOOR SAFTY VALVES: BOP STACK: TEST DATA CHOKE MANIFOLD: Quantity P/F MISC. INSPECTIONS: MUD SYSTEM: P/F ACCUMULATOR SYSTEM: P/F Upper Kelly P/F _ P Visual Alarm 0 none _ Time/Pressure P/F Location Gen.: P Trip Tank P- - P System Pressure - 3000- P Housekeeping: P-_ Pit Level Indicators -P P Pressure After Closure 1850 - P-" PTD On Location P Flow Indicator P P 200 PSI Attained 20 P Standing Order Posted P_ Meth Gas Detector P -P Full Pressure Attained - 68 -P Well Sign P H2S Gas Detector P P Blind Switch Covers: All stations P " Drl. Rig -P _ MS Misc NA_ _NA- #5 Rams Nitgn. Bottles (avg): -6 an, 2000 - P Hazard Sec. P__' #6 Rams ACC Mise 0 NA Misc NA Choke Ln. Valves 1 31/811 P Quantity FLOOR SAFTY VALVES: BOP STACK: CHOKE MANIFOLD: Quantity P/F Quantity Size P/F Quantity P/F Upper Kelly - 1 _ P Stripper 0 none _ NA- No. Valves ---14 - P Lower Kelly 1 P _ Annular Preventer 1 13 5/8"_ _ P- Manual Chokes -1 -_P Ball Type _1 P #1 Rams 1 3 1/2" x_6" _ - P-_ Hydraulic Chokes 1 - P Inside BOP 1 P ' #2 Rams 1 Blind shears FP CH Mise 0 NA_ FSV Misc 0 NA #3 Rams 1 3 1/2" x 6" FP #4 Rams 0 none NA #5 Rams 0 none_ NA INSIDE REEL VALVES: #6 Rams 0 none NA (Valid for Coil Rigs Only) Choke Ln. Valves 1 31/811 P Quantity P/F HCR Valves 2 3 1/8" _ P Inside Reel Valves 0 NA - Kill Line Valves 1 -3 1/8" P Check Valve 0 none NA BOP Misc 1 ' flange - FP Number of Failures: 3 ✓ Test Results Test Time 9 Remarks: FP on oteco flange, gasket was changed out and tested good. FP on lower pipe rams they were cycled and tested good. FP an Blinds, they retested good. Closing times on accumulator were: Bag 15 sec, Upper rams 6 sec, Blinds 6 sec, Lower rams 6 sec, and 1 sec on_6oiF_RCRs. Žƒ•ƒ‹Žƒ† ƒ• ‘•‡”˜ƒ–‹‘‘‹••‹‘ 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov   Chris Brillon Wells Engineering Manager ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Undefined Waste Disposal Pool, WD-03 ConocoPhillips Alaska, Inc. Permit to Drill Number: 221-103 Surface Location: 574’ FNL, 2229’ FWL, Sec. 5, T11N, R5E, UM Bottomhole Location: 2730’ FNL, 68’ FWL, Sec. 5, T11N, R5E, UM Dear Mr. Brillon: Enclosed is the approved application for the permit to drill the above referenced well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of January, 2022.  Jeremy Price Digitally signed by Jeremy Price Date: 2022.01.04 14:33:40 -09'00' From:Davies, Stephen F (OGC) To:Smith, Matt Cc:Loepp, Victoria T (OGC); Boyer, David L (OGC) Subject:RE: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) Date:Thursday, December 2, 2021 4:43:11 PM Matt, I have a few questions regarding the diverter waiver variance being sought by CPAI for WD-03. I read through the daily operations summaries in AOGCC's files for nearby disposal well WD-02, and for wells CD1-34, CD1-41, CD1-42, and CD1-43, which have casing shoes near that planned for WD- 03. These exceedingly brief operations summaries do not mention any major drilling incidents while drilling surface hole. However, reports for CD1-42 and CD1-43 mention "slight swabbing" while pulling pipe. In Alpine 1, Bergschrund 1, and Bergschrund 2 (the nearest wells to WD-03 that were mud logged; all are within 2 miles), what appear to be gas hydrates occur beneath the base of permafrost. While recorded surface-hole gas measurements were mostly insignificant, Bergschrund 1 (located about 4000 feet northeast of WD-03) encountered about 630 units of gas at 1270' MD (equivalent to -1229' TVDSS) with 10.1 ppg mud in the well. Q: If a diverter waiver is granted, to ensure safety, what measures will CPAI employ to monitor the well while drilling surface hole and tripping pipe? Gas measurements on the mud logs appear to elevate rapidly as the Tuluvak is approached. In Alpine 1, the Tuluvak registered up to 450 units of gas while drilling with 10.6 ppg mud. Bergschrund 1 encountered 347 units of gas while drilling the Tuluvak with 10.2 ppg mud. Q: What measures will CPAI employ to ensure that the surface hole does not penetrate the Tuluvak? Thanks again and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Smith, Matt <Matt.Smith2@conocophillips.com> Sent: Tuesday, November 30, 2021 3:45 PM To: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: RE: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) Hi Steve, Thanks for reaching out. To answer your questions: 1. Please find attached surveys in excel for the well 2. The pressures calculated in the ASP on page 4/5 of the APD document are correct. What I noticed however is that the FPP for the ‘Drilling under 7-5/8” shoe’ should be 4861 psi, instead of 4400 psi. The actual ASP calculated is correct, at 3877psi. I had worked these out in a spreadsheet and missed this when I transferred it over to the Word Document. 3. We will perform surveys at a maximum of every 100’ for the entire well, and more frequently if necessary for any AC concerns. Since we have MWD tools in all our BHA’s, it makes sense to collect a survey at each connection. 4. We will place cement across the Kuparuk C out of abundance of caution, even though what we anticipate encountering at this location is not good reservoir quality. For the Qannik we do anticipate encountering good reservoir (minimum 5’ TVD of 10+ohm resistivity rock), and based on offset wells on the pad performing a 2 stage cement job, we plan to do so here as well. 5. I also noticed an error on our surface casing pressure test on page 5. We will test surface casing to 3500psi, not 4200psi. This is above our ASP of 1736 psi based on the Frac gradient at the surface shoe, as well as above 50% of burst for the casing. If you have any further questions, please don’t hesitate to reach out. Thanks, Matt Smith Drilling Engineer – Alaska Kuparuk 700 G St AnchorAGe AlASkA, Ato-1704 office: +1.907.263.4324 cell: +1.432.269.6432 mAtt.Smith2@cop.com From: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Sent: Tuesday, November 30, 2021 9:33 AM To: Smith, Matt <Matt.Smith2@conocophillips.com> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov> Subject: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Matt, In addition to my request and question, below, in CPAI’s proposed operations program for this directionally drilled well, I did not see specific mention of directional survey tools to be used or intended frequency of collection for directional survey data, which have been provided with most past applications. Please review and ensure compliance with 20 AAC 25.050. What are CPAI’s proposed criteria for determining whether or not cement will be placed across the Kuparuk and Qannik intervals? Thanks again and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Davies, Stephen F (OGC) Sent: Monday, November 29, 2021 4:59 PM To: Smith, Matt <Matt.Smith2@conocophillips.com> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov> Subject: CRU WD-03 (PTD 221-103) Matt, I’m reviewing the Permit to Drill application for CRU WD-03. Could CPAI please provide the planned directional survey data in spreadsheet or ASCII comma-delimited table form? I only need MD, azimuth, and inclination data to load into my workstation. Having this information in digital format speeds my portion of the application review. Also, I noticed that the downhole and surface maximum potential pressure values listed on the application form do not match any of the values shown in the “ASP Calculations” section (pages 4 and 5). Which are correct? Thanks and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov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y Meredith Guhl at 3:55 pm, Nov 29, 2021 6)' &':   6HF715(80  '656)' 3DFNHU GHSWK YDULDQFH JUDQWHG WR DOORZ SODFHPHQW RI WKH SDFNHU XS WR  0'DERYH WKH WRS SHUIRUDWLRQ  $$&  E &%/ UHTXLUHG IRU ,QW FHPHQW SULRU WR GULOOLQJ SURGXFWLRQ KROH 5HYLHZ FHPHQW MRE UHVXOWV &%/ UHVXOWV DQG LQWHUSUHWDWLRQ Z $2*&&  ;  97/  %23 WHVW WR  SVLJ DQQXODU SUHYHQWHU WHVW WR  SVLJ ,QLWLDO %23 WHVW WR  SVLJ 5LJ LQVSHFWLRQ UTG DW 68 RI 'R\RQ  'LYHUWHU YDULDQFH JUDQWHG SHU  $$&  K  97/   JLC 1/4/2022 1/4/22 Jeremy Price Digitally signed by Jeremy Price Date: 2022.01.04 14:32:07 -09'00'                 !  " #" #             ! ""#   $%    &  ' ('   $%&   '( ) *+((,'$$(-,$ !(  )!.,*/(,-0 1 1 *)$+  -*  $2 - 34, /$  *#4 !- , * / 4-0 5/6$!. ,0 7**3 #4 !!- ,/$  # 5%$++ 2!8  +9(: ,(*  /( - (,3*#4- +!)*/-- ($(-#*#4 (,, !- 2 1 4 !-( (  , *  ); ,;  #* #<=< =!,-$2 *$  !,  ,-!+!, *   ,( (,> -  #* <=;+ !  ,(,(,(,   ,!8   ! ,, (  , ,(( ( (*/ ,!8,> 9!,- ! 3 , *  ', ,;+  #* #<=< =,+-*',  ((  ,-!&  *? 2 ''@)/)?.'$(  #* #<= *((!(! *(( (! *!,(!+ #*',;+  #* #<=< = 3*$ !1  ,;+  #* # <=  ),((( (+,&  *$!,A';( ;( ,+;+  #* #<=<=* * (,!,!+* *$!,(*  ),++;;,, (  %" 2 32   <&  &#)  &=A" 2 3#23 *   +      &       $2 ?1B/+  / #3  $@/  3 %     A    / # C $!D!    ' A+    / #C +% 9((   ; ,;  #* #<=< =  ,( (,> -  #* <=                                                                         ! "#$##           ! "  #$       ! "# ##%      %   !        & ' #  ! "          ( !   #        (  '    #        (            (             )        )   *+ #,    -  ..                                                       !"#$%%%& !#$'((")*$+,  !  " #$ %&% ' #$ !! () '* -./0,'# + '* (&./0,'#  "#$ %&' (&)% !"#$1- !#$'((")*$+,  !  " #$ %%&& ' #$ !%% , + "- ()$&&/ . /  "- ()$-/ . /  "- 00$-1-/   *" +()% !"#$1- !#$'((")*$+,  !  " #$ %%&& ' #$ !%% , + "- ()$(/ . /  "- ()$&-/ . /  "- 00$&-(/                                            .2    0 34  '  .  (. ,5)+ 6 (%   %. )   $   . .  (17           #2  38). . ) (.7       . . 59:2*,2; . 1. 9:2* %  <$  %-   6  . . 2 =    &<->((7  9?0        .#       @ '      . -. 4      %   . &.   %/   !5<#:.,> !5 (.,  #: ;     (.*,. (.  &<->((7       0 4. ((. ::?      . (%. 5? &<->((7    $ ,2                      #2  38)<)*'<<"<2 . (. 4     .1%7    $ . (. ).1%7    %/A</, B6    @       . (. 4    (<%7>17A9). (1. 9:2* %  <$  %-) 6  . (. 2 =    1.7  9?0.#            . (-. 4      %   . (&.      =%    .2 !5<#: >  (.,   ; = B (.%*,. %.  1.7    #2  38)<)*'. %(. 2      9?0.)B  C     :4. %%. ).7      .'    =   >  .         . %. :!!  ::?. %. (<%7   $%   . %. ) *  49# (<%7   C . %1. 2 =42 6)5? 7  .4     B.,         .::?   . %. 2+ (<%7   <  .'    .2      $   .  $    = . %-. 2    $%   .2  7>(<%7 $%   . %&. ' ':A.592A %$   . %   . 6)' 6)' SVL 3HU06PLWKHPDLOGDWHGVXUIDFHFDVLQJZLOOEHWHVWHGWRSVL 3HU06PLWKHPDLOGDWHG GLUHFWLRQDOVXUYH\GDWDZLOOEHUHFRUGHG DWDPD[LPXPRIHYHU\ IRUHQWLUH ZHOODQGPRUHIUHTXHQWO\LIQHFHVVDU\ 5XQ &%/ WR GHWHUPLQH 72& DQG FHPHQW TXDOLW\ ,QWHUSUHWDWLRQ DQG ORJ WR $2*&& DV VRRQ DV DYDLODEOH                    . "  9:2"+   6.2    $ .5 92A   $ . (. 292A @   50 (( ,  6 . %. '  .)   B .                ! "#$##  2    9:2      6 (%  5  ;B    B   ;  %004%.%  .04($           6       B.    B 6 4($4(-$4(&$4((  /         ."    6        6 .                      0'2     3                              ! " !" ! "!#$ %" "&#&'% ()* &'  ") "!(&(1 '#) % $(($- "%#* %+!! - %#% "!%(&$*(! " #$ (+&$*   #,- .*/,.0-, 1 /12312 #1.*/,01 .#,./,.(1#)  0'2     (     =             $ %     >          3 ( 0'2DE!8>.%.(FG   3 0'2D0 '         !8D!        <   .%D4 B   .<  <    .(D8    <    D A       )H9    -,  % 0'2D!22I.(>   3 !22D!  2 2  >      !22D.%>A  1# 1 /12-  (. * 45!6 $  0'2DE!8>.%I.(F    DE(.&>.%I.(F>(%D   :)  0'2D!22I.(>    D(I.(>%%D-%   %. * 45 6   4 6$$$ "    6        6 .  ;B    B   ;  %004%.%  .          6       B. ;; 04($  %+!! 'LYHUWHUUHTXLUHPHQWYDULDQFHLVUHDVRQDEOHEDVHGRQDGGLWLRQDOLQIRUPDWLRQSURYLGHG LQDWWDFKHGHPDLOIURP0DWW6PLWK&3$,GDWHG6)' SSJ(0: 6)'                     0'2DE!8>.%I.(F    DE(1>.%I.(F> &' D(1   :) 0'2D!22I.(>    D%I.(>-D(%-   . * 456 $   4 0'2DE!8>.%I.(F    DE(%.&>.%I.(F>-D1((  :) 0'2D!22I.(>    DI.(>&-D-            >   6@ .         !   !    "     "  #    $  2  ?@ ' 6        ! "  #$      ! "# ##          #: !5    0 #:<!5   4  2  0=   4   .           4 $   4#4  %&'  (# ) * +,  #   - *'%#.    !      ! (  $( ,-(! .    /    0 "!11 "&#&'% ") )* 2-*! ,1%)&  /     '#) %$-'*3 "" $#' 2*! 4 %!!567 89+:9   1  %#% )#'% "%#% 2-*! ,1%""  /    (#%  " #) 2-*! ,1%)& 6  0B    =   C   %004%.(%   ; 6    %    B    $   B   @ $B     B            B = .   @   C    B H =      (1  =.          6   4  78*97:*  4 %1-/, (&1- /   48J0 .K((228$ (&1-      ((4 .0%L>  B    L>     -&/,$@ >  %7   .  0B    =   C   %004%.(%   ; 6)'  D%I.(>-D(%-               /              / ; *$' &;< ! "#$%& '()  *  &+ %"#$  / ;&($ &;<' % ! %"#$% '()  62 $    4    78*97:*      6   ((/,$  /, B   6     @ H =.5   B ; 6M =   $% C         .0L>  B .    + , "#$& * -  .**& './ ! &"#$%, '()  *  ++ +%"#$  / ;& &;<&' ! %"#$% '()  = /      /  >6   1   *  +  ' %"#$  / ;(*! &;<+& ! %"#$% '()   6#$      !78*9 !7:*     6   &%&/,$     $  N%/,   5  (   .0L>  B .  *   +' &+"%#*"#$  / ;"%" &;<+ ! "%#*"#$"#") '()     !          0  12  3  2 4 05# ") $-'*3"" )#'% 205# "&#&'% '#) % %#% 2  $#!?"!#! "!#%-""#% $#%?"!#% 6)'6HH4DQQLNUHVHUYRLUTXDOLW\FULWHULDLQDWWDFKHGHPDLOIURP06PLWKGDWHG 6 $ 5   B ; 6M =   $              $      3- &!-*! "! "! 636#"!!  "!!- !! !- * "!-"% 722-  @ # &!! %!-)! (!-%! 12"6#"!! %! "! )  2"6#"!! )! "% * 317 &!/# A##?"%#! %#! (#! 434*7 &!/#  *#!?" #! "!#! 4""#! $#%?"!#! $#!?$#%   &;  0 > >        >      B.H    B   6 <;     (% <;      .)  B   6    .,   O(.6     6      6.  2 $ ;  !   6 6.*     6   >  @     B 6.         $   6    B   . ,   N((.     6           6.8    =; 6$          6   ;            6.   N((.I((.-     . " 3,2    ,2   @   =             6 6  .  #$  &;       B        ! 2   N(      H4  @,2          .      6 (%,'6  .                   %004%..   ' #  ! "            0 4    B   $ 6    C   4(.:  B $   =             .4        .  !   #          "<00     >  6     .   '    #          "<00       .                 @,2       ,2   @ 0 4    B   $ 6         $   =              . 6  ;     N((.I((.-     . 6 ,   N((.               0      *B      4  2  0=$5 .    4   .                        5   B        *<!  C   4(   4(.  *<!  <              @       N% A    $N(%/.'  6   @    60        .  /    B   H =  B $% C     6   B ; 6M =       $   .  : *<!     ' 6:   (  .  '       4  $ B4.  =   4 B 8  =   B B             .              1        *+ #  6  B     84 ('%',9212 : ;:2B92 7      1  C 20    1 7# .  20  0 + 7 1 / ,1  20 =6 7 ? +  /    / +  / /    1C  /   // 0 + =  /0  + 0  0 +   7 1+ BD B7   / =  /0  +0 +/   1 /  2    / B  / +/ 1+   / + 0  1 /    + +      <,(!94 (,%&92<212 : ;:2B92 7      1  +    ,   6 1+ 6 2 + =  /0  + BD+    +0 +  /  @7      1 E / +   2   20 B  / +    +  /  E/ +/ 1+   /  , 066   / B    + /   +   +/  +  / E / +2 06    6/B  7     / .  + 90   +  /0   ,1   20 , +  1 /+/+ 0     +/7     %,94 (%92 <3  24  ;:2B92 7      1 2   20 B  / +    +  /  E/ +/ 1+   /  , 066   / B    + /   +   +/  +  / E /  6/B  7    20 .  + 90   +  /0                           9 20 F/  7   +9   /7+ /0   ,1   20 , +  1 /+/+ 0     +/7   / 0  #1 23     4(.:4($    (/  .4     4(&$4(-4(         8          .          .     <   B      ; 60:844%044%.  B       .    1 23 ) B 2  3:  C         B    0  4 B   .         ; .  =      B  .#4,  B          .  #  ''  63?)P<H =<, B <H =  ;      6      6.,2                 6     .' #4,       >     B       .  8            @   = = =.        8   #4,  B  $        . ; 6 ,2                 6 :  C         B    0  4 B   .                        -                                                     &' ZS3ODQ6XPPDU\  'RJOHJ6HYHULW\        0HDVXUHG'HSWK [[                 $]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XV IWLQ@      &'         &'    &'    &'3%   &'   &'3%     &'    &'    &'3%        &'        &'$      &'       &'3%  7UXH9HUWLFDO'HSWK        9HUWLFDO6HFWLRQDWƒ [ [   &HQWUHWR&HQWUH6HSDUDWLRQ        0HDVXUHG'HSWK (TXLYDOHQW0DJQHWLF'LVWDQFH '',  6859(< 352*5$0 'DWH79DOLGDWHG<HV9HUVLRQ 'HSWK)URP 'HSWK 7R 6XUYH\3ODQ 7RRO   &'ZS &' *<'*&66   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:',1&B21/< ,1&!ƒ   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:',1&B21/< ,1&!ƒ   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06 &$6,1* '(7$,/6 79' 0' 1DPH   [   [   [ 0DJ0RGHO 'DWH %**0 )HE 0DJQHWLF1RUWKLVƒ(DVWRI7UXH1RUWK 0DJQHWLF'HFOLQDWLR 0DJ'LS )LHOG6WUHQJWK ƒ Q7 6(&7,21 '(7$,/6 6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ                     .236WDUWƒ '/6ƒ7)IRU           6WDUWƒ '/6ƒ7)IRU          +ROGIRU           $GMXVW7)WRƒIRU           6WDUWƒ '/6ƒ7)IRU          +ROGIRU         6WDUWƒ '/6ƒ7)IRU        $GMXVW7)WRƒ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ƒ[[[ƒƒƒƒ&' ZS&&&&.&HQWUDO.B%DVDO4DQQLN.$OELDQB$OELDQB$OELDQB)&6+5=.DOXELN.B0DUNHU.XSDUXNB&/&8$OSLQHB&.LQJDNB).LQJDNB(1XLTVXLW1HFKHOLN6DJB5LYHU6KXEOLN,YLVKDN7'&' ZS1RYHPEHU6HFWLRQ9LHZ 6RXWK  1RUWK         :HVW  (DVW  [[[&' ZS3ODQ9LHZWhile drilling production section, stay within 100 feet laterally of plan, unless notified otherwise.1RYHPEHU &' ZS6SLGHU3ORW1RYHPEHU7R1RUWKLQJ XVIWLQ (DVWLQJ XVIWLQ &'&'$&'3%&'&'&'$&'&'&'3%&'&'3%&'&'3%&'3%&'&'&'3%&'&'&'&'/&'&'&'3%&'3%&'3%&'&'3%&'&'&'&'$&'&'&'/&'3%&'&'$&'%&'%3%&'&'3%&'&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&'3%&'&'3%&'&'&'3%&'&'$&'&'3%:'&'ZS DND&58:' 6)' ConocoPh i l I1 pS ConocoPhillips Standard Proposal Report Database: EDT 15 Alaska Prod Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Local Co-ordinate Reference: Well Plan: CD1-50 TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) MD Reference: Plan: 39+19.5 @ 58.50usft (D142) North Reference: True Survey Calculation Method: Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD1 Alpine Pad Site Position: From: Map Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: -0.87 ° Well Plan: CD1-50 Well Position +NI-S-351.74 usft +E/-W-340.96 usft Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 19.50 usft Ilbore CD1-50 gnetics Model Sample Date Declination Dip Angle Field Strength Rm (1) (1 (nT) BGGM2021 2/15/2022 15.03 80.64 57,200.40 Design CD1-50 wp07.1 Audit Notes: Version: Phase: PLAN Tie On Depth: 39.00 Vertical Section: Depth From (TVD) +NI-S +E/-W Direction (usft) (usft) (usft) (1) I - 39.00 0.00 0.00 224.96 111312021 3-24:35PM Page 2 COMPASS 5000.15 Build 91E ,,- ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 15 Alaska Prod Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Local Co-ordinate Reference: Well Plan: CD1-50 TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) MD Reference: Plan: 39+19.5 @ 58.50usft (D142) North Reference: True Survey Calculation Method: Minimum Curvature Plan Survey Tool Program Date 11/3/2021 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 39.00 1,400.00 CD1-50wp07.1 (CD1-50) GYD-GC-SS Gyrodata gyro single shots 2 1,400.00 2,400.00 CD1-50wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 3 1,400.00 2,468.00 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + l\ 4 2,468.00 2,568.00 CD1-50 wp07.1 (CD1-50) MWD-INC_ONLY (INC>10°) MWD-INC-ONLY-FILLER (INS 5 2,568.00 4,068.00 CD1-50 wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 6 2,568.00 9,448.00 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + A 7 9,448.00 9,548.00 CD1-50 wp07.1 (CD1-50) MWD-INC_ONLY (INC>10°) MWD-INC-ONLY-FILLER (INS 8 9,548.00 10,542.96 CD1-50 wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 9 9,548.00 10,542.96 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + A Plan Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) (°) Target 39.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 600.00 3.00 209.00 599.86 -6.87 -3.81 1.00 1.00 0.00 209.00 1,569.00 22.38 209.00 1,540.69 -192.16 -106.52 2.00 2.00 0.00 0.00 2,531.85 22.38 209.00 2,431.02 -512.80 -284.25 0.00 0.00 0.00 0.00 2,581.85 22.38 209.00 2,477.25 -529.45 -293.48 0.00 0.00 0.00 0.00 3,326.21 29.00 230.00 3,149.05 -770.13 -501.06 1.50 0.89 2.82 63.80 7,036.21 29.00 230.00 6,393.88 -1,926.28 -1,878.90 0.00 0.00 0.00 0.00 7,729.58 15.13 230.00 7,034.90 -2,093.31 -2,077.96 2.00 -2.00 0.00 180.00 8,486.21 0.00 0.00 7,782.76 -2,157.16 -2,154.05 2.00 -2.00 17.18 180.00 10,542.96 0.00 0.00 9,839.51 -2,157.16 -2,154.05 0.00 0.00 0.00 0.00 111312021 3:24:35PM Page 3 COMPASS 5000.15 Build 91E ConocoPh i l I1 pS ConocoPhillips Standard Proposal Report Database: EDT 15 Alaska Prod Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: , CD1-50 Design: CDl-50 wp07.1 Local Co-ordinate Reference: Well Plan: CD1-50 TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) MD Reference: Plan: 39+19.5 @ 58.50usft (D142) North Reference: True Survey Calculation Method: Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) ' (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 39.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP: Start 1 °/100' DLS, 209° TF, for 300' 400.00 1.00 209.00 399.99 -0.76 -0.42 0.84 1.00 1.00 0.00 500.00 2.00 209.00 499.96 -3.05 -1.69 3.36 1.00 1.00 0.00 600.00 3.00 209.00 599.86 -6.87 -3.81 7.55 1.00 1.00 0.00 Start 2°/100' DLS, 0° TF, for 969' 700.00 5.00 209.00 699.61 -12.97 -7.19 14.26 2.00 2.00 0.00 800.00 7.00 209.00 799.06 -22.11 -12.26 24.31 2.00 2.00 0.00 900.00 9.00 209.00 898.08 -34.28 -19.00 37.69 2.00 2.00 0.00 1,000.00 11.00 209.00 996.56 -49.47 -27.42 54.38 2.00 2.00 0.00 1,100.00 13.00 209.00 1,094.37 -67.65 -37.50 74.37 2.00 2.00 0.00 1,200.00 15.00 209.00 1,191.39 -88.81 -49.23 97.63 2.00 2.00 0.00 1,300.00 17.00 209.00 1,287.51 -112.92 -62.59 124.13 2.00 2.00 0.00 1,400.00 19.00 209.00 1,382.62 -139.94 -77.57 153.84 2.00 2.00 0.00 1,500.00 21.00 209.00 1,476.58 -169.85 -94.15 186.72 2.00 2.00 0.00 1,569.00 22.38 209.00 1,540.69 -192.16 -106.52 211.24 2.00 2.00 0.00 Hold for 962.85' 1,600.00 22.38 209.00 1,569.36 -202.48 -112.24 222.59 0.00 0.00 0.00 1,700.00 22.38 209.00 1,661.83 -235.78 -130.70 259.19 0.00 0.00 0.00 1,800.00 22.38 209.00 1,754.29 -269.08 -149.16 295.80 0.00 0.00 0.00 1,900.00 22.38 209.00 1,846.76 -302.38 -167.61 332.41 0.00 0.00 0.00 2,000.00 22.38 209.00 1,939.23 -335.69 -186.07 369.02 0.00 0.00 0.00 2,100.00 22.38 209.00 2,031.70 -368.99 -204.53 405.62 0.00 0.00 0.00 2,200.00 22.38 209.00 2,124.17 402.29 -222.99 442.23 0.00 0.00 0.00 2,237.95 22.38 209.00 2,159.26 -414.93 -230.00 456.12 0.00 0.00 0.00 C40 2,300.00 22.38 209.00 2,216.63 -435.59 -241.45 478.84 0.00 0.00 0.00 2,400.00 22.38 209.00 2,309.10 468.89 -259.91 515.44 0.00 0.00 0.00 2,467.91 22.38 209.00 2,371.90 -491.51 -272.45 540.31 0.00 0.00 0.00 13 3/8" x 16" - 500ft Radius - surface shoe 2,500.00 22.38 209.00 2,401.57 -502.19 -278.37 552.05 0.00 0.00 0.00 2,501.85 22.38 209.00 2,403.28 -502.81 -278.71 552.73 0.00 0.00 0.00 C30 2,531.85 22.38 209.00 2,431.02 -512.80 -284.25 563.71 0.00 0.00 0.00 Adjust TF to 0°, for 60' 2,581.85 22.38 209.00 2,477.25 -529.45 -293.48 582.02 0.00 0.00 0.00 Start 1.5°/100' DLS, 63.8° TF, for 744.36' 2,600.00 22.50 209.64 2,494.03 -535.49 -296.87 588.69 1.50 0.67 3.52 2,700.00 23.21 213.04 2,586.18 -568.64 -317.08 626.43 1.50 0.71 3.40 2,800.00 24.00 216.23 2,677.82 -601.57 -339.84 665.81 1.50 0.78 3.20 2,892.51 24.77 219.02 2,762.08 -631.80 -363.17 703.69 1.50 0.84 3.01 C20 2,900.00 24.84 219.24 2,768.87 -634.24 -365.15 706.81 1.50 0.87 2.91 3,000.00 25.74 222.04 2,859.29 -666.64 -392.98 749.40 1.50 0.90 2.81 3,100.00 26.69 224.67 2,949.01 -698.73 -423.31 793.55 1.50 0.95 2.63 3,182.12 27.50 226.70 3,022.12 -724.86 -450.08 830.95 1.50 0.99 2.47 C10 3,200.00 27.69 227.13 3,037.96 -730.51 -456.13 839.22 1.50 1.01 2.39 3,300.00 28.72 229.42 3,126.09 -761.95 -491.41 886.39 1.50 1.04 2.30 3,326.21 29.00 230.00 3,149.05 -770.13 -501.06 899.00 1.50 1.06 2.20 111312021 3-24:35PM Page 4 COMPASS 5000.15 Build 91E ConocoPh i l I1 pS ConocoPhillips Standard Proposal Report Database: EDT 15 Alaska Prod Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: , CD1-50 Design: CDl-50 wp07.1 Local Co-ordinate Reference: Well Plan: CD1-50 TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) MD Reference: Plan: 39+19.5 @ 58.50usft (D142) North Reference: True Survey Calculation Method: Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) Hold for 3710' 3,400.00 29.00 230.00 3,213.58 -793.13 -528.46 934.64 0.00 0.00 0.00 3,500.00 29.00 230.00 3,301.04 -824.29 -565.60 982.93 0.00 0.00 0.00 3,600.00 29.00 230.00 3,388.51 -855.45 -602.74 1,031.23 0.00 0.00 0.00 3,700.00 29.00 230.00 3,475.97 -886.61 -639.88 1,079.52 0.00 0.00 0.00 3,800.00 29.00 230.00 3,563.43 -917.78 -677.02 1,127.81 0.00 0.00 0.00 3,900.00 29.00 230.00 3,650.89 -948.94 -714.15 1,176.11 0.00 0.00 0.00 4,000.00 29.00 230.00 3,738.35 -980.10 -751.29 1,224.40 0.00 0.00 0.00 4,072.27 29.00 230.00 3,801.56 -1,002.62 -778.13 1,259.30 0.00 0.00 0.00 K3 4,100.00 29.00 230.00 3,825.82 -1,011.27 -788.43 1,272.69 0.00 0.00 0.00 4,200.00 29.00 230.00 3,913.28 -1,042.43 -825.57 1,320.99 0.00 0.00 0.00 4,300.00 29.00 230.00 4,000.74 -1,073.59 -862.71 1,369.28 0.00 0.00 0.00 4,301.34 29.00 230.00 4,001.91 -1,074.01 -863.21 1,369.92 0.00 0.00 0.00 Central/K3 Basal 4,345.94 29.00 230.00 4,040.92 -1,087.91 -879.77 1,391.46 0.00 0.00 0.00 Qannik/K2 4,400.00 29.00 230.00 4,088.20 -1,104.76 -899.85 1,417.57 0.00 0.00 0.00 4,500.00 29.00 230.00 4,175.66 -1,135.92 -936.99 1,465.87 0.00 0.00 0.00 4,600.00 29.00 230.00 4,263.13 -1,167.08 -974.12 1,514.16 0.00 0.00 0.00 4,700.00 29.00 230.00 4,350.59 -1,198.24 -1,011.26 1,562.45 0.00 0.00 0.00 4,800.00 29.00 230.00 4,438.05 -1,229.41 -1,048.40 1,610.75 0.00 0.00 0.00 4,900.00 29.00 230.00 4,525.51 -1,260.57 -1,085.54 1,659.04 0.00 0.00 0.00 5,000.00 29.00 230.00 4,612.97 -1,291.73 -1,122.68 1,707.33 0.00 0.00 0.00 5,100.00 29.00 230.00 4,700.44 -1,322.90 -1,159.82 1,755.63 0.00 0.00 0.00 5,200.00 29.00 230.00 4,787.90 -1,354.06 -1,196.96 1,803.92 0.00 0.00 0.00 5,300.00 29.00 230.00 4,875.36 -1,385.22 -1,234.09 1,852.21 0.00 0.00 0.00 5,400.00 29.00 230.00 4,962.82 -1,416.39 -1,271.23 1,900.51 0.00 0.00 0.00 5,500.00 29.00 230.00 5,050.28 -1,447.55 -1,308.37 1,948.80 0.00 0.00 0.00 5,600.00 29.00 230.00 5,137.75 -1,478.71 -1,345.51 1,997.09 0.00 0.00 0.00 5,700.00 29.00 230.00 5,225.21 -1,509.87 -1,382.65 2,045.39 0.00 0.00 0.00 5,800.00 29.00 230.00 5,312.67 -1,541.04 -1,419.79 2,093.68 0.00 0.00 0.00 5,900.00 29.00 230.00 5,400.13 -1,572.20 -1,456.93 2,141.97 0.00 0.00 0.00 6,000.00 29.00 230.00 5,487.59 -1,603.36 -1,494.06 2,190.27 0.00 0.00 0.00 6,100.00 29.00 230.00 5,575.06 -1,634.53 -1,531.20 2,238.56 0.00 0.00 0.00 6,200.00 29.00 230.00 5,662.52 -1,665.69 -1,568.34 2,286.85 0.00 0.00 0.00 6,300.00 29.00 230.00 5,749.98 -1,696.85 -1,605.48 2,335.15 0.00 0.00 0.00 6,348.71 29.00 230.00 5,792.58 -1,712.03 -1,623.57 2,358.67 0.00 0.00 0.00 Albian_97 6,400.00 29.00 230.00 5,837.44 -1,728.01 -1,642.62 2,383.44 0.00 0.00 0.00 6,500.00 29.00 230.00 5,924.90 -1,759.18 -1,679.76 2,431.73 0.00 0.00 0.00 6,600.00 29.00 230.00 6,012.37 -1,790.34 -1,716.90 2,480.03 0.00 0.00 0.00 6,700.00 29.00 230.00 6,099.83 -1,821.50 -1,754.03 2,528.32 0.00 0.00 0.00 6,800.00 29.00 230.00 6,187.29 -1,852.67 -1,791.17 2,576.61 0.00 0.00 0.00 6,871.63 29.00 230.00 6,249.94 -1,874.99 -1,817.78 2,611.21 0.00 0.00 0.00 Albian_96 6,900.00 29.00 230.00 6,274.75 -1,883.83 -1,828.31 2,624.91 0.00 0.00 0.00 7,000.00 29.00 230.00 6,362.21 -1,914.99 -1,865.45 2,673.20 0.00 0.00 0.00 7,036.21 29.00 230.00 6,393.88 -1,926.28 -1,878.90 2,690.69 0.00 0.00 0.00 Start 2°/100' DLS, 180° TF, for 693.37' 7,100.00 27.72 230.00 6,450.02 -1,945.75 -1,902.11 2,720.87 2.00 -2.00 0.00 7,103.20 27.66 230.00 6,452.85 -1,946.71 -1,903.25 2,722.36 2.00 -2.00 0.00 Albian 95 111312021 3-24:35PM Page 5 COMPASS 5000.15 Build 91E ConocoPh i l I1 pS ConocoPhillips Standard Proposal Report Database: EDT 15 Alaska Prod Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: , CD1-50 Design: CDl-50 wp07.1 Local Co-ordinate Reference: Well Plan: CD1-50 TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) MD Reference: Plan: 39+19.5 @ 58.50usft (D142) North Reference: True Survey Calculation Method: Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 7,200.00 25.72 230.00 6,539.33 -1,974.66 -1,936.56 2,765.67 2.00 -2.00 0.00 7,300.00 23.72 230.00 6,630.16 -2,001.54 -1,968.60 2,807.33 2.00 -2.00 0.00 7,347.74 22.77 230.00 6,674.02 -2,013.65 -1,983.03 2,826.10 2.00 -2.00 0.00 FCS/HRZ 7,400.00 21.72 230.00 6,722.39 -2,026.37 -1,998.19 2,845.81 2.00 -2.00 0.00 7,469.60 20.33 230.00 6,787.35 -2,042.42 -2,017.32 2,870.68 2.00 -2.00 0.00 Kalubik 7,500.00 19.72 230.00 6,815.92 -2,049.12 -2,025.29 2,881.05 2.00 -2.00 0.00 7,514.05 19.44 230.00 6,829.15 -2,052.14 -2,028.90 2,885.75 2.00 -2.00 0.00 K1_Marker 7,600.00 17.72 230.00 6,910.62 -2,069.75 -2,049.88 2,913.03 2.00 -2.00 0.00 7,608.55 17.55 230.00 6,918.77 -2,071.42 -2,051.87 2,915.61 2.00 -2.00 0.00 Kuparuk C 7,615.69 17.41 230.00 6,925.58 -2,072.80 -2,053.51 2,917.75 2.00 -2.00 0.00 LCU 7,700.00 15.72 230.00 7,006.38 -2,088.25 -2,071.93 2,941.69 2.00 -2.00 0.00 7,710.37 15.52 230.00 7,016.37 -2,090.04 -2,074.07 2,944.48 2.00 -2.00 0.00 Alpine C Top_wp 3 7,729.58 15.13 230.00 7,034.90 -2,093.31 -2,077.96 2,949.53 2.00 -2.00 0.00 Adjust TF to 180°, for 756.63' 7,740.90 14.91 230.00 7,045.83 -2,095.19 -2,080.20 2,952.46 2.00 -2.00 0.00 Alpine_C - CD1-50 T01 Alpine C 101421_PB_QM - CD1-50 T01 Alpine C 101421_PB 7,800.00 13.72 230.00 7,103.09 -2,104.58 -2,091.40 2,967.01 2.00 -2.00 0.00 7,837.24 12.98 230.00 7,139.33 -2,110.11 -2,097.98 2,975.58 2.00 -2.00 0.00 Kingak_F 7,900.00 11.72 230.00 7,200.63 -2,118.74 -2,108.27 2,988.95 2.00 -2.00 0.00 7,904.12 11.64 230.00 7,204.67 -2,119.28 -2,108.91 2,989.78 2.00 -2.00 0.00 Kingak_E 8,000.00 9.72 230.00 7,298.88 -2,130.70 -2,122.52 3,007.49 2.00 -2.00 0.00 8,024.22 9.24 230.00 7,322.77 -2,133.27 -2,125.58 3,011.46 2.00 -2.00 0.00 Nuigsuit 8,100.00 7.72 230.00 7,397.72 -2,140.45 -2,134.14 3,022.59 2.00 -2.00 0.00 8,200.00 5.72 230.00 7,497.03 -2,147.98 -2,143.11 3,034.26 2.00 -2.00 0.00 8,300.00 3.72 230.00 7,596.68 -2,153.27 -2,149.42 3,042.46 2.00 -2.00 0.00 8,327.24 3.18 230.00 7,623.87 -2,154.32 -2,150.67 3,044.10 2.00 -2.00 0.00 Nechelik 8,400.00 1.72 230.00 7,696.56 -2,156.32 -2,153.06 3,047.20 2.00 -2.00 0.00 8,486.21 0.00 0.00 7,782.76 -2,157.16 -2,154.05 3,048.49 2.00 -2.00 150.79 Hold for 2056.75' 8,500.00 0.00 0.00 7,796.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 8,600.00 0.00 0.00 7,896.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 8,700.00 0.00 0.00 7,996.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 8,800.00 0.00 0.00 8,096.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 8,900.00 0.00 0.00 8,196.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,000.00 0.00 0.00 8,296.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,100.00 0.00 0.00 8,396.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,200.00 0.00 0.00 8,496.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,300.00 0.00 0.00 8,596.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,400.00 0.00 0.00 8,696.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,448.65 0.00 0.00 8,745.20 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 7-5/8" x 9-7/8" 9,483.41 0.00 0.00 8,779.96 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 111312021 3-24:35PM Page 6 COMPASS 5000.15 Build 91E ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 15 Alaska Prod Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Planned Survey Local Co-ordinate Reference: Well Plan: CD1-50 TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) MD Reference: Plan: 39+19.5 @ 58.50usft (D142) North Reference: True Survey Calculation Method: Minimum Curvature Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) Sag_River - CD1-50 T02 Sag_River 101421_PB_QM - CD1-50 T02 Sag -River 101421_PB 9,491.95 0.00 0.00 8,788.50 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 CD1-50 DSP Tgt 2 - CD1-50 DSP Tgt 2 QM 9,500.00 0.00 0.00 8,796.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,523.41 0.00 0.00 8,819.96 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 Shublik 9,546.95 0.00 0.00 8,843.50 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 CD1 DSP Tgt 1 9,600.00 0.00 0.00 8,896.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,700.00 0.00 0.00 8,996.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,800.00 0.00 0.00 9,096.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,900.00 0.00 0.00 9,196.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 9,927.70 0.00 0.00 9,224.25 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 Ivishak 10,000.00 0.00 0.00 9,296.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 10,100.00 0.00 0.00 9,396.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 10,200.00 0.00 0.00 9,496.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 10,300.00 0.00 0.00 9,596.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 10,400.00 0.00 0.00 9,696.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 10,500.00 0.00 0.00 9,796.55 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 10,542.96 0.00 0.00 9,839.51 -2,157.16 -2,154.05 3,048.49 0.00 0.00 0.00 TD: 10542.96' MD, 9839.5l' TVD - TD Design Targets Target Name hitimiss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape (°) (I (usft) (usft) (usft) CD1-50 T01 Alpine C 1C 0.00 0.00 7,045.83 -2,095.19 -2,080.20 plan hits target center Circle (radius 1,320.00) CD 1 -50 T02 Sag_River 0.00 0.00 8,779.96 -2,157.16 -2,154.05 - plan hits target center - Circle (radius 1,320.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,467.91 2,371.90 13 3/8" x 16" 13.375 16.000 9,448.65 8,745.20 7-5/8" x 9-7/8" 7.625 9.875 10,542.96 9,839.51 5 1/2" x 6 3/4" 5.500 6.750 111312021 3-24:35PM Page 7 COMPASS 5000.15 Build 91E ConocoPhillips Conoco fflips Standard Proposal Report Database: EDT 15 Alaska Prod Local Co-ordinate Reference: Well Plan: CD1-50 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) Project: Western North Slope MD Reference: Plan: 39+19.5 @ 58.50usft (D142) Site: ll CD1 Alpine Pad North Reference: True Well: Plan: CD1-50 Survey Calculation Method: Minimum Curvature Wellbore: CD1-50 Design: CDl-50 wp07.1 Formations Measured Vertical Depth Depth (usft) (usft) Name 2,237.95 2,159.26 C40 Empty 2,501.85 2,403.28 C30 Empty 2,892.51 2,762.08 C20 Empty 3,182.12 3,022.12 C10 Empty 4,072.27 3,801.56 K3 Empty 4,301.34 4,001.91 Central/K3_Basal Empty 4,345.94 4,040.92 Qannik/K2 Empty 6,348.71 5,792.58 Albian_97 Empty 6,871.63 6,249.94 Albian_96 Empty 7,103.20 6,452.85 Albian_95 Empty 7,347.74 6,674.02 FCS/HRZ Empty 7,469.60 6,787.35 Kalubik Empty 7,514.05 6,829.15 K1_Marker Empty 7,608.55 6,918.77 Kuparuk_C Empty 7,615.69 6,925.58 LCU Empty 7,740.90 7,045.83 Alpine _C Empty 7,837.24 7,139.33 Kingak_F Empty 7,904.12 7,204.67 Kingak E Empty 8,024.22 7,322.77 Nuiqsuit Empty 8,327.24 7,623.87 Nechelik Empty 9,483.41 8,779.96 Sag_River Empty 9,523.41 8,819.96 Shublik Empty 9,927.70 9,224.25 Ivishak Empty 10,542.96 9,839.51 TD Empty Lithology Dip Dip Direction (1) (1) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Plan Annotations r Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 300.00 300.00 0.00 0.00 KOP: Start 1'/100' DLS, 209' TF, for 300' 600.00 599.86 -6.87 -3.81 Start 2°/100' DLS, 0° TF, for 969' 1,569.00 1,540.69 -192.16 -106.52 Hold for962.85' 2,531.85 2,431.02 -512.80 -284.25 Adjust TF to 0°, for 50' 2,581.85 2,477.25 -529.45 -293.48 Start 1.5°/100' DLS, 63.8° TF, for 744.36' 3,326.21 3,149.05 -770.13 -501.06 Hold for 3710' 7,036.21 6,393.88 -1,926.28 -1,878.90 Start 2°/100' DLS, 180° TF, for 693.37' 7,729.58 7,034.90 -2,093.31 -2,077.96 Adjust TF to 180°, for 756.63' 8,486.21 7,782.76 -2,157.16 -2,154.05 Hold for2056.75' 10,542.96 9,839.51 -2,157.16 -2,154.05 TD: 10542.96' MD, 9839.51' TVD 111312021 3-24:35PM Page 8 COMPASS 5000.15 Build 91E ConocoPhillips Alaska Inc WNS Western North Slope CD1 Alpine Pad Plan: C131-50 CD1-50 50103xxxxx00 CD1-50 wp07.1 ConocoPhillips Clearance Summary Anticollision Report 03 November, 2021 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD1 Alpine Pad - Plan: CD1-50 - CD1-50 - CD1-50 wp07.1 Datum Height: Plan: 39+19.5 @ 58.50usft (D142) Scan Range: 0.00 to 10,542.96 usft. Measured Depth. Scan Radius is Unlimited . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Geodetic Scale Factor Applied Version: 5000.15 Build: 91E Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 ConocoPhillips p ConocoPhillips Alaska Inc_WNS Cono coPh i I I i ps Western North Slope Anticollision Report for Plan: CD1-50 - C131-50 wp07.1 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD1 Alpine Pad - Plan: CD1-50 - CD1-50 - CD1-50 wp07.1 Scan Range: 0.00 to 10,542.96 usft. Measured Depth. Scan Radius is Unlimited. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD1 Alpine Pad CD1-229 - CD1-229 - CD1-229 589.03 196.66 589.03 191.73 600.00 39.885 Centre Distance Pass - CD1-229 - CD1-229 - CD1-229 612.26 196.71 612.26 191.50 625.00 37.714 Ellipse Separation Pass - CD1-229 - CD1-229 - CD1-229 1,432.84 359.76 1,432.84 340.76 1,525.00 18.939 Clearance Factor Pass - CD1-229 - CD1-229PB1 - CD1-229PB1 589.03 196.66 589.03 191.73 600.00 39.885 Centre Distance Pass - CD1-229 - CD1-229PB1 - CD1-229PB1 612.26 196.71 612.26 191.50 625.00 37.714 Ellipse Separation Pass - CD1-229 - CD1-229PB1 - CD1-229PB1 1,432.84 359.76 1,432.84 340.76 1,525.00 18.939 Clearance Factor Pass - CD1-25 - CD1-25 - CD1-25 102.70 249.92 102.70 248.55 100.00 182.372 Centre Distance Pass - CD1-25 - CD1-25 - CD1-25 326.57 250.48 326.57 247.75 325.00 91.825 Ellipse Separation Pass - CD1-25 - CD1-25 - CD1-25 1,286.67 485.03 1,286.67 471.00 1,425.00 34.584 Clearance Factor Pass - CD1-26 - CD1-26 - CD1-26 374.76 238.53 374.76 235.55 375.00 79.988 Centre Distance Pass - CD1-26 - CD1-26 - CD1-26 400.00 238.58 400.00 235.46 400.00 76.522 Ellipse Separation Pass - CD1-26 - CD1-26 - CD1-26 2,388.05 1,182.72 2,388.05 1,141.39 2,775.00 28.613 Clearance Factor Pass - CD1-26 - CD1-26PB1 - CD1-26PB1 374.76 238.53 374.76 235.55 375.00 79.988 Centre Distance Pass - CD1-26 - CD1-26PB1 - CD1-26PB1 400.00 238.58 400.00 235.46 400.00 76.522 Ellipse Separation Pass - CD1-26 - CD1-26PB1 - CD1-26PB1 2,388.05 1,182.72 2,388.05 1,141.28 2,775.00 28.538 Clearance Factor Pass - CD1-27 - CD1-27 - CD1-27 776.09 213.88 776.09 207.96 800.00 36.104 Centre Distance Pass - CD1-27 - CD1-27 - CD1-27 800.00 213.95 800.00 207.78 825.00 34.698 Ellipse Separation Pass - CD1-27 - CD1-27 - CD1-27 1,424.14 350.83 1,424.14 332.90 1,525.00 19.561 Clearance Factor Pass - CD1-28 - CD1-28 - CD1-28 102.85 219.97 102.85 218.60 100.00 160.434 Centre Distance Pass - CD1-28 - CD1-28 - CD1-28 152.85 220.06 152.85 218.40 150.00 132.454 Ellipse Separation Pass - CD1-28 - CD1-28 - CD1-28 1,044.39 298.33 1,044.39 291.04 1,100.00 40.917 Clearance Factor Pass - CD1-28 - CD1-28PB1 - CD1-28PB1 102.85 219.97 102.85 218.60 100.00 160.434 Centre Distance Pass - CD1-28 - CD1-28PB1 - CD1-28PB1 152.85 220.06 152.85 218.40 150.00 132.454 Ellipse Separation Pass - CD1-28 - CD1-28PB1 - CD1-28PB1 1,044.39 298.33 1,044.39 291.04 1,100.00 40.917 Clearance Factor Pass - CD1-30 - CD1-30 - CD1-30 518.88 193.64 518.88 189.61 525.00 48.089 Centre Distance Pass - CD1-30 - CD1-30 - CD1-30 542.83 193.75 542.83 189.55 550.00 46.067 Ellipse Separation Pass - CD1-30 - CD1-30 - CD1-30 1,251.02 350.20 1,251.02 337.80 1,350.00 28.256 Clearance Factor Pass - CD1-30 - CD1-30PB1 - CD1-30PB1 518.88 193.64 518.88 189.61 525.00 48.089 Centre Distance Pass - 03 November, 2021 - 15:26 Page 2 of 8 COMPASS ConocoPhillips Alaska Inc_WNS Cono coPh i I I i ps Western North Slope Anticollision Report for Plan: CD1-50 - CD1-50 wp07.1 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD1 Alpine Pad - Plan: CD1-50 - CD1-50 - CD1-50 wp07.1 Scan Range: 0.00 to 10,542.96 usft. Measured Depth. Scan Radius is Unlimited. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD1-30 - CD1-30PB1 - CD1-30PB1 542.83 193.75 542.83 189.55 550.00 46.067 Ellipse Separation Pass - CD1-30-CD1-30PB1-CD1-30PB1 1,251.02 350.20 1,251.02 337.80 1,350.00 28.256 Clearance Factor Pass - CD1-31 - CD1-31 - CD1-31 227.87 189.26 227.87 187.43 225.00 103.380 Centre Distance Pass - CD1-31 - CD1-31 - CD1-31 277.87 189.35 277.87 187.32 275.00 93.154 Ellipse Separation Pass - CD1-31 - CD1-31 - CD1-31 2,258.38 851.52 2,258.38 815.38 2,625.00 23.556 Clearance Factor Pass - CD1-32 - CD1-32 - CD1-32 102.80 179.91 102.80 178.54 100.00 131.239 Centre Distance Pass - CD1-32 - CD1-32 - CD1-32 326.98 180.34 326.98 177.61 325.00 66.043 Ellipse Separation Pass - CD1-32 - CD1-32 - CD1-32 1,410.77 330.02 1,410.77 314.00 1,525.00 20.596 Clearance Factor Pass - CD1-32 - CD1-32PB1 - CD1-32PB1 102.80 179.91 102.80 178.54 100.00 131.239 Centre Distance Pass - CD1-32 - CD1-32PB1 - CD1-32PB1 326.98 180.34 326.98 177.61 325.00 66.043 Ellipse Separation Pass - CD1-32 - CD1-32PB1 - CD1-32PB1 1,410.77 330.02 1,410.77 314.00 1,525.00 20.596 Clearance Factor Pass - CD1-33 - CD1-33 - CD1-33 227.85 169.78 227.85 167.65 225.00 79.733 Centre Distance Pass - CD1-33 - CD1-33 - CD1-33 327.07 169.97 327.07 167.24 325.00 62.456 Ellipse Separation Pass - CD1-33 - CD1-33 - CD1-33 7,373.94 1,243.52 7,373.94 1,136.67 8,625.00 11.638 Clearance Factor Pass - CD1-34 - CD1-34 - CD1-34 448.32 159.28 448.32 155.91 450.00 47.282 Centre Distance Pass - CD1-34 - CD1-34 - CD1-34 593.96 159.52 593.96 155.26 600.00 37.451 Ellipse Separation Pass - CD1-34 - CD1-34 - CD1-34 7,827.36 507.53 7,827.36 375.78 8,175.00 3.852 Clearance Factor Pass - CD1-35 - CD1-35 - CD1-35 496.87 144.03 496.87 140.40 500.00 39.732 Centre Distance Pass - CD1-35 - CD1-35 - CD1-35 521.21 144.15 521.21 140.39 525.00 38.268 Ellipse Separation Pass - CD1-35 - CD1-35 - CD1-35 1,132.57 195.14 1,132.57 186.58 1,175.00 22.799 Clearance Factor Pass - CD1-36 - CD1-36 - CD1-36 638.68 123.66 638.68 118.34 650.00 23.247 Centre Distance Pass - CD1-36 - CD1-36 - CD1-36 662.05 123.68 662.05 118.08 675.00 22.087 Ellipse Separation Pass - CD1-36 - CD1-36 - CD1-36 968.30 151.55 968.30 142.50 1,000.00 16.749 Clearance Factor Pass - CD1-36 - CD1-36PB1 - CD1-36PB1 638.68 123.66 638.68 118.34 650.00 23.247 Centre Distance Pass - CD1-36 - CD1-36PB1 - CD1-36PB1 662.05 123.68 662.05 118.08 675.00 22.087 Ellipse Separation Pass - CD1-36 - CD1-36PB1 - CD1-36PB1 968.30 151.55 968.30 142.50 1,000.00 16.749 Clearance Factor Pass - CD1-37 - CD1-37 - CD1-37 102.05 129.92 102.05 128.55 100.00 95.019 Centre Distance Pass - CD1-37 - CD1-37 - CD1-37 448.66 130.14 448.66 126.74 450.00 38.269 Ellipse Separation Pass - CD1-37 - CD1-37 - CD1-37 1,484.78 257.89 1,484.78 241.04 1,550.00 15.303 Clearance Factor Pass - CD1-38 - CD1-38 - CD1-38 400.00 118.76 400.00 115.59 400.00 37.458 Centre Distance Pass - 03 November, 2021 - 15:26 Page 3 of 8 COMPASS ConocoPhillips Alaska Inc_WNS Cono coPh i I I i ps Western North Slope Anticollision Report for Plan: CD1-50 - CD1-50 wp07.1 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD1 Alpine Pad - Plan: CD1-50 - CD1-50 - CD1-50 wp07.1 Scan Range: 0.00 to 10,542.96 usft. Measured Depth. Scan Radius is Unlimited. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD1-38 - CD1-38 - CD1-38 643.46 119.32 643.46 114.44 650.00 24.443 Ellipse Separation Pass - CD1-38 - CD1-38 - CD1-38 1,362.97 165.50 1,362.97 150.80 1,400.00 11.252 Clearance Factor Pass - CD1-38 - CD1-38PB1 - CD1-38PB1 400.00 118.76 400.00 115.59 400.00 37.458 Centre Distance Pass - CD1-38 - CD1-38PB1 - CD1-38PB1 643.46 119.32 643.46 114.44 650.00 24.443 Ellipse Separation Pass - CD1-38-CD1-38PB1-CD1-38PB1 1,362.97 165.50 1,362.97 150.80 1,400.00 11.252 Clearance Factor Pass - CD1-39 - CD1-39 - CD1-39 302.65 109.64 302.65 107.05 300.00 42.282 Centre Distance Pass - CD1-39 - CD1-39 - CD1-39 351.74 109.77 351.74 106.92 350.00 38.469 Ellipse Separation Pass - CD1-39 - CD1-39 - CD1-39 2,410.80 222.89 2,410.80 190.20 2,500.00 6.818 Clearance Factor Pass - CD1-39 - CD1-39PB1 - CD1-39PB1 302.65 109.64 302.65 107.05 300.00 42.282 Centre Distance Pass - CD1-39 - CD1-39PB1 - CD1-39PB1 351.74 109.77 351.74 106.92 350.00 38.469 Ellipse Separation Pass - CD1-39 - CD1-39PB1 - CD1-39PB1 2,410.80 222.89 2,410.80 190.20 2,500.00 6.818 Clearance Factor Pass - CD1-40 - CD1-40 - CD1-40 1,158.27 58.31 1,158.27 47.29 1,175.00 5.288 Centre Distance Pass - CD1-40 - CD1-40 - CD1-40 1,182.63 58.64 1,182.63 47.22 1,200.00 5.137 Ellipse Separation Pass - CD1-40 - CD1-40 - CD1-40 1,231.40 60.83 1,231.40 48.74 1,250.00 5.028 Clearance Factor Pass - CD1-41 - CD1-41 - CD1-41 425.43 87.91 425.43 84.59 425.00 26.480 Centre Distance Pass - CD1-41 - CD1-41 - CD1-41 449.95 87.98 449.95 84.52 450.00 25.429 Ellipse Separation Pass - CD1-41-CD1-41-CD1-41 6,373.93 1,248.95 6,373.93 1,121.95 6,525.00 9.834 Clearance Factor Pass - CD1-41-CD1-41PB1-CD1-41PB1 425.43 87.91 425.43 84.59 425.00 26.480 Centre Distance Pass - CD1-41-CD1-41PB1-CD1-41PB1 449.95 87.98 449.95 84.52 450.00 25.429 Ellipse Separation Pass - CD1-41-CD1-41PB1-CD1-41PB1 6,373.93 1,248.95 6,373.93 1,121.84 6,525.00 9.826 Clearance Factor Pass - CD1-42 - CD1-42 - CD1-42 621.24 70.87 621.24 66.16 625.00 15.046 Ellipse Separation Pass - CD1-42 - CD1-42 - CD1-42 788.60 82.54 788.60 76.03 800.00 12.687 Clearance Factor Pass - CD1-43 - CD1-43 - CD1-43 993.26 13.34 993.26 5.24 1,000.00 1.647 Centre Distance Pass - CD1-43 - CD1-43 - CD1-43 1,018.02 13.50 1,018.02 4.87 1,025.00 1.564 Clearance Factor Pass - CD1-44 - CD1-44 - CD1-44 574.00 49.45 574.00 45.21 575.00 11.654 Centre Distance Pass - CD1-44 - CD1-44 - CD1-44 598.55 49.45 598.55 45.01 600.00 11.128 Ellipse Separation Pass - CD1-44 - CD1-44 - CD1-44 744.21 56.72 744.21 50.92 750.00 9.777 Clearance Factor Pass - CD1-44 - CD1-44PB1 - CD1-44PB1 574.00 49.45 574.00 45.21 575.00 11.654 Centre Distance Pass - CD1-44 - CD1-44PB1 - CD1-44PB1 598.55 49.45 598.55 45.01 600.00 11.128 Ellipse Separation Pass - CD1-44 - CD1-44PB1 - CD1-44PB1 744.21 56.72 744.21 50.92 750.00 9.777 Clearance Factor Pass - 03 November, 2021 - 15:26 Page 4 of 8 COMPASS Cono coPh i I I i ps ConocoPhillips Alaska Inc_WNS Western North Slope Anticollision Report for Plan: CD1-50 - CD1-50 wp07.1 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD1 Alpine Pad - Plan: CD1-50 - CD1-50 - CD1-50 wp07.1 Scan Range: 0.00 to 10,542.96 usft. Measured Depth. Scan Radius is Unlimited. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is 1,000.00 usft Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD1-45 - CD1-45 - CD1-45 746.95 27.76 746.95 22.24 750.00 5.028 Centre Distance Pass - CD1-45 - CD1-45 - CD1-45 771.51 28.03 771.51 22.23 775.00 4.830 Ellipse Separation Pass - CD1-45 - CD1-45 - CD1-45 796.06 28.83 796.06 22.75 800.00 4.739 Clearance Factor Pass - CD1-45 - CD1-45PB1 - CD1-45PB1 746.95 27.76 746.95 22.24 750.00 5.028 Centre Distance Pass - CD1-45 - CD1-45PB1 - CD1-45PB1 771.51 28.03 771.51 22.23 775.00 4.830 Ellipse Separation Pass - CD1-45 - CD1-45PB1 - CD1-45PB1 796.06 28.83 796.06 22.75 800.00 4.739 Clearance Factor Pass - CD1-46 - CD1-46 - CD1-46 39.00 39.89 39.00 38.82 36.52 37.347 Centre Distance Pass - CD1-46 - CD1-46 - CD1-46 102.48 40.06 102.48 38.67 100.00 28.745 Ellipse Separation Pass - CD1-46 - CD1-46 - CD1-46 550.06 46.09 550.06 41.80 550.00 10.747 Clearance Factor Pass - CD1-47 - CD1-47 - CD147 351.93 28.45 351.93 25.75 350.00 10.552 Centre Distance Pass - CD1-47 - CD1-47 - CD1-47 376.80 28.55 376.80 25.75 375.00 10.206 Ellipse Separation Pass - CD1-47 - CD1-47 - CD1-47 650.00 35.15 650.00 31.15 650.00 8.787 Clearance Factor Pass - CD1-47 - CD1-47PB1 - CD1-47PB1 351.93 28.45 351.93 25.75 350.00 10.552 Centre Distance Pass - CD1-47 - CD1-47PB1 - CD1-47PB1 376.80 28.55 376.80 25.75 375.00 10.206 Ellipse Separation Pass - CD1-47 - CD1-47PB1 - CD1-47PB1 650.00 35.15 650.00 31.15 650.00 8.787 Clearance Factor Pass - CD1-48 - CD1-48 - CD1-48 39.00 19.77 39.00 18.71 28.00 18.513 Centre Distance Pass - CD1-48 - CD1-48 - CD1-48 360.73 21.08 360.73 18.36 350.00 7.746 Ellipse Separation Pass - CD1-48 - CD1-48 - CD1-48 659.31 24.42 659.31 20.47 650.00 6.170 Clearance Factor Pass - CD1-48 - CD1-48A- CD1-48A 39.00 19.77 39.00 18.71 27.25 18.513 Centre Distance Pass - CD1-48 - CD1-48A- CD1-48A 361.47 21.08 361.47 18.36 350.00 7.739 Ellipse Separation Pass - CD1-48 - CD1-48A- CD1-48A 660.06 24.45 660.06 20.49 650.00 6.170 Clearance Factor Pass - CD1-49 - CD1-49 - CD1-49 327.95 9.07 327.95 6.43 325.00 3.437 Centre Distance Pass - CD1-49 - CD1-49 - CD149 602.47 9.30 602.47 5.82 600.00 2.673 Clearance Factor Pass - CD1-49 - CD1-49PB1 - CD1-49PB1 652.34 8.56 652.34 4.48 650.00 2.096 Clearance Factor Pass - 03 November, 2021 - 15:26 Page 5 of 8 COMPASS IP. ConocoPhillips Anticollision Report for Plan: CD1-50 - C131-50 wp07.1 Survey tool program From To Survey/Plan Survey Tool (usft) (usft) 39.00 1,400.00 CD1-50 wp07.1 GYD-GC-SS 1,400.00 2,400.00 CD1-50 wp07.1 MWD OWSG 1,400.00 2,468.00 CD1-50 wp07.1 MWD+IFR2+SAG+MS 2,468.00 2,568.00 CD1-50 wp07.1 MWD-INC_ONLY (INC>10°) 2,568.00 4,068.00 CD1-50 wp07.1 MWD OWSG 2,568.00 9,448.00 CD1-50 wp07.1 MWD+IFR2+SAG+MS 9,448.00 9,548.00 CD1-50 wp07.1 MWD-INC—ONLY (INC>10°) 9,548.00 10,542.96 CD1-50 wp07.1 MWD OWSG 9,548.00 10,542.96 CD1-50 wp07.1 MWD+IFR2+SAG+MS Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. ConocoPhillips Alaska Inc WNS Western North Slope 03 November, 2021 - 15:26 Page 6 of 8 COMPASS V-11 ConocoPhillips Anticollision Report for Plan: CD1-50 - CD1-50 wp07.1 Clearance Factor Plot: Measured Depth versus Separation(Clearance) Factor it 0 750 1500 2250 3000 3750 4500 5250 6000 6750 7500 8250 9000 Measured Depth (1500 usftln) ConocoPhillips Alaska Inc WNS Western North Slope -W CD1 -27, CD1 -27, CD1 -27 V1 $ CD1 -28, CD1 -28, CD1 -28 V1 $ CD1-28,CD1-28PB1,CD1-28PB1 V1 CD1 -30, CD1 -30, CD1 -30 V1 $ CD1-30,CD1-30PB1,CD1-30PB1 V1 $ CD1-31,CD1-31,CD1-31 V6 $ CD1-32,CD1-32,CD1-32V1 $ CD1-32,CD1-32PB1,CD1-32PB1 V3 $ CD1-33,CD1-33,CD1-33V1 $ CD1 -34, CD1 -34, CD1 -34 V1 CD1 -35, CD1 -35, CD1 -35 V1 $ CD1 -36, CD1 -36, CD1 -36 V1 $ CD1-36,CD1-36PB1,CD1-36PB1 V1 $ CD1 -37, CD1 -37, CD1 -37 V5 $ CD1-38,CD1-38,CD1-38V1 $ CD1 -38, CD1 -38PB1, CD1 -38PB1 V1 $ CD1 -39, CD1 -39, CD1 -39 V1 CD1-39,CD1-39PB1,CD1-39PB1 V1 CD1 -40, CD1 -40, CD1 -40 V1 $ CD1-41,CD1-41,CD1-41 V1 $ CD1 -41, CD1 -41 PB1, CD1 -41 PB1 V1 $ CD1 -42, CD1 -42, CD1 -42 V1 $ CD1 -43, CD1 -43, CD1 -43 V1 CD1 -44, CD1 -44, CD1 -44 V1 CD1-44,CD1-44PB1,CD1-44PB1 V1 CD1 -45, CD1 -45, CD1 -45 V1 CD1-45,CD1-45PB1,CD1-45PB1 V1 03 November, 2021 - 15:26 Page 8 of 8 COMPASS   &HQWUHWR&HQWUH6HSDUDWLRQ      3DUWLDO0HDVXUHG'HSWK&'&'&'&'3%&'&'3%&'&'&'3%&'&'$&'&'3%(TXLYDOHQW0DJQHWLF'LVWDQFH &' ZS /DGGHU9LHZ   &HQWUHWR&HQWUH6HSDUDWLRQ      0HDVXUHG'HSWK&'&'3%&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&'3%&'&'3%&'&'&'3%&'&'$&'&'3%(TXLYDOHQW0DJQHWLF'LVWDQFH 6859(<352*5$0 'HSWK )URP 'HSWK 7R 6XUYH\3ODQ 7RRO   &'ZS &' *<'*&66   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:',1&B21/< ,1&!ƒ   &'ZS &' 0:'2:6*   &'ZS &' 0:',)56$*06   &'ZS &' 0:',1&B21/< ,1&!ƒ  &'ZS &' 0:'2:6*  &'ZS &' 0:',)56$*06 1RYHPEHU &$6,1*'(7$,/6 79' 0' 1DPH   [   [   [                                                 &' ZS 7&9LHZ                      $]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@   &'   &'        &'        &'        &'3%     &'            &'            &'3%  &'  &'3%              &'         &'         &'3%       &'     &'     &'     &'3%   &'   &'3%         &'        &'        &'3%           &'           &'$          &'        &'3% 6859(< 352*5$0 'DWH79DOLGDWHG<HV9HUVLRQ )URP 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ  0:'2:6*  0:',)56$*06   0:',1&B21/< ,1&!ƒ  0:'2:6*  0:',)56$*06 &$6,1* '(7$,/6 79'0'1DPH   [   [  [ 6(&7,21 '(7$,/6 6HF 0' ,QF $]L 79' 16 (: 'OHJ 7)DFH 96HFW 7DUJHW $QQRWDWLRQ                     .236WDUWƒ '/6ƒ7)IRU           6WDUWƒ '/6ƒ7)IRU           +ROGIRU           $GMXVW7)WRƒIRU           6WDUWƒ '/6ƒ7)IRU           +ROGIRU           6WDUWƒ '/6ƒ7)IRU           $GMXVW7)WRƒIRU           +ROGIRU           7' 0' 79' ϭͲϱϬǁƉϬϳ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ   0:' 2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ   0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'&'&'&'&'3%&'&'3%&'&'&'3%&'&'$&'&'3%                        )URP&RORXU7R0'ϯϵ͘ϬϬdŽϭϬϬϬ͘ϬϬ0' $]L 7)DFH                       ϭͲϱϬǁƉϬϳ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ   0:' 2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ   0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'&'3%&'&'&'&'3%&'&'3%&'&'&'3%&'&'$&'&'3%                        )URP&RORXU7R0'ϭϬϬϬ͘ϬϬdŽϮϱϬϬ͘ϬϬ0' $]L 7)DFH                       ϭͲϱϬǁƉϬϳ͘ϭ&ůŝƉŬ6859(<352*5$0'HSWK)URP 'HSWK 7R 7RRO  *<'*&66  0:'2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ   0:' 2:6*  0:',)56$*06  0:',1&B21/< ,1&!ƒ   0:'2:6*  0:',)56$*06&$6,1* '(7$,/679'0'1DPH  [  [  [$]LPXWKIURP1RUWK>ƒ@YV7UDYHOOLQJ&\OLQGHU6HSDUDWLRQ>XVIWLQ@&'&'3%                        )URP&RORXU7R0'ϮϱϬϬ͘ϬϬdŽϭϬϱϰϯ͘ϬϬ0' $]L 7)DFH                       ConocoPhillips Alaska Inc_WNS Western North Slope CD1 Alpine Pad Plan: CD1-50 50103xxxxx00 CD1-50 Plan: CD1-50 wp07.1 Error Ellipse Survey Report 03 November, 2021 Company: ConocoPhillips Alaska Inc WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD1-50 Plan: 39+19.5 @ 58.50usft (D142) Plan: 39+19.5 @ 58.50usft (D142) True Minimum Curvature 2.00 sigma EDT 15 Alaska Prod Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Site CD1 Alpine Pad Site Position: From: Map Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: -0.87 ° Well Plan: CD1-50 Well Position +NI-S 0.00 usft +E/-W 0.00 usft Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 19.50 usft Wellbore CD1-50 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°)MJ (°) (nT) BGGM2021 2/15/2022 15.03 80.64 57,200.40 Design CD1-50 wp07.1 _ Audit Notes: Version: Phase: PLAN Tie On Depth: 39.00 Vertical Section: Depth From (TVD) +NI-S +E/-W Direction (usft) (usft) (usft) (°) 39.00 0.00 0.00 224.96 Survey Tool Program Date 11/3/2021 From To (usft) (usft) Survey (Wellbore) Tool Name Description 39.00 1,400.00 CD1-50 wp07.1 (CD1-50) GYD-GC-SS Gyrodata gyro single shots 1,400.00 2,400.00 CD1-50 wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 1,400.00 2,468.00 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correction 2,468.00 2,568.00 CD1-50 wp07.1 (CD1-50) MWD-INC-ONLY (INC>10°) MWD-INC-ONLY-FILLER ( INC>10°) 2,568.00 4,068.00 CD1-50 wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 2,568.00 9,448.00 CD1-50 wp07.1 (CD 1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correction 9,448.00 9,548.00 CD1-50 wp07.1 (CD 1-50) MWD-INC-ONLY (INC>10°) MWD-INC-ONLY-FILLER ( INC>10°) 9,548.00 10,542.96 CD1-50 wp07.1 (CD 1-50) MWD OWSG OWSG MWD - Standard 9,548.00 10,542.96 CID 1-50 wp07.1 (CD 1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correction 111312021 3-34:45PM Page 2 COMPASS 5000.15 Build 91E ConocoPhillips Error Ellipse Report Company: ConocoPhillips Alaska Inc WNS Local Co-ordinate Reference: Well Plan: CD1-50 Project: Western North Slope TVD Reference: Plan: 39+19.5 @ 58.50usft (D142) Site: CD1 Alpine Pad MD Reference: Plan: 39+19.5 @ 58.50usft (D142) Well: Plan: CD1-50 North Reference: True Wellbore: CD1-50 Survey Calculation Method: Minimum Curvature Design: CD1-50 wp07.1 Output errors are at 2.00 sigma Database: EDT 15 Alaska Prod Plan Survey Tool Program Date 11/3/2021 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 39.00 1,400.00 CD1-50wp07.1 (CD 1-50) GYD-GC-SS Gyrodata gyro single shots 2 1,400.00 2,400.00 CD1-50 wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 3 1,400.00 2,468.00 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + 4 2,468.00 2,568.00 CD1-50 wp07.1 (CD1-50) MWD-INC-ONLY (INC>10°) MWD-INC-ONLY-FILLER (IP 5 2,568.00 4,068.00 CD1-50 wp07.1 (CD 1-50) MWD OWSG OWSG MWD - Standard 6 2,568.00 9,448.00 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + 7 9,448.00 9,548.00 CD1-50 wp07.1 (CD1-50) MWD-INC_ONLY (INC>10°) MWD-INC_ONLY_FILLER (IP 8 9,548.00 10,542.96 CD1-50 wp07.1 (CD1-50) MWD OWSG OWSG MWD - Standard 9 9,548.00 10,542.96 CD1-50 wp07.1 (CD1-50) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 16 39.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 UNDEFINED 100.00 0.00 0.00 100.00 0.18 0.00 0.18 0.00 2.30 0.00 0.00 0.18 0.18 0.00 GYD-GC-SS (1, 1) 200.00 0.00 0.00 200.00 0.47 0.00 0.47 0.00 2.30 0.00 0.00 0.47 0.47 0.00 GYD-GC-88 (1, 1) 300.00 0.00 0.00 300.00 0.76 0.00 0.76 0.00 2.30 0.01 0.01 0.76 0.76 0.00 GYD-GC-SS (1, 1) 400.00 1.00 209.00 399.99 0.93 0.00 0.93 0.00 2.30 0.02 0.02 0.93 0.93 135.00 GYD-GC-88 (1, 1) 500.00 2.00 209.00 499.96 1.04 0.00 1.04 0.00 2.31 0.03 0.03 1.04 1.04 135.00 GYD-GC-SS (1, 1) 600.00 3.00 209.00 599.86 1.22 0.00 1.22 0.00 2.31 0.04 0.04 1.22 1.22 135.00 GYD-GC-SS (1, 1) 700.00 5.00 209.00 699.61 1.43 0.00 1.44 0.00 2.31 0.06 0.06 1.44 1.44 135.00 GYD-GC-SS (1, 1) 800.00 7.00 209.00 799.06 1.67 -0.01 1.69 0.00 2.31 0.07 0.07 1.69 1.69 45.00 GYD-GC-88 (1, 1) 900.00 9.00 209.00 898.08 1.92 -0.01 1.97 0.00 2.31 0.09 0.09 1.97 1.95 30.06 GYD-GC-SS (1, 1) 1,000.00 11.00 209.00 996.56 2.19 -0.01 2.28 0.00 2.31 0.12 0.12 2.28 2.24 29.59 GYD-GC-SS (1, 1) 1,100.00 13.00 209.00 1,094.37 2.47 -0.02 2.62 0.00 2.31 0.14 0.14 2.62 2.53 29.42 GYD-GC-SS (1, 1) 1,200.00 15.00 209.00 1,191.39 2.76 -0.02 2.99 0.00 2.32 0.17 0.17 2.99 2.83 29.33 GYD-GC-88 (1, 1) 1,300.00 17.00 209.00 1,287.51 3.06 -0.03 3.39 0.00 2.32 0.20 0.20 3.39 3.14 29.27 GYD-GC-SS (1, 1) 1,400.00 19.00 209.00 1,382.62 3.37 -0.04 3.82 0.00 2.33 0.23 0.24 3.82 3.46 29.23 GYD-GC-88 (1, 1) 1,500.00 21.00 209.00 1,476.58 3.52 -0.04 4.09 0.00 2.72 0.01 0.04 4.09 3.68 29.20 MWD OWSG (1, 2) 1,569.00 22.38 209.00 1,540.69 3.53 -0.04 4.27 0.00 2.75 0.01 0.04 4.27 3.73 29.08 MWD OWSG (1, 2) 1,600.00 22.38 209.00 1,569.36 3.56 -0.04 4.40 0.00 2.77 0.01 0.04 4.40 3.76 29.03 MWD OWSG (1, 2) 111312021 3-34:45PM Page 3 COMPASS 5000.15 Build 91E ConocoPhillips Error Ellipse Report Company: ConocoPhillips Alaska Inc WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Position uncertainty and bias at survey station Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD1-50 Plan: 39+19.5 @ 58.50usft (D142) Plan: 39+19.5 @ 58.50usft (D142) True Minimum Curvature 2.00 sigma EDT 15 Alaska Prod Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) , (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) - 1,700.00 22.38 209.00 1,661.83 3.67 -0.04 4.98 0.00 2.85 0.01 0.04 4.98 3.85 28.91 MWD OWSG (1, 2) 1,800.00 22.38 209.00 1,754.29 3.83 -0.04 5.73 0.00 2.95 0.01 0.04 5.73 3.99 28.86 MWD OWSG (1, 2) 1,900.00 22.38 209.00 1,846.76 4.03 -0.04 6.60 0.00 3.06 0.01 0.04 6.60 4.17 28.83 MWD OWSG (1, 2) 2,000.00 22.38 209.00 1,939.23 4.27 -0.04 7.55 0.00 3.18 0.01 0.04 7.55 4.38 28.81 MWD OWSG (1, 2) 2,100.00 22.38 209.00 2,031.70 4.55 -0.04 8.55 0.00 3.31 0.01 0.04 8.55 4.62 28.80 MWD OWSG (1, 2) 2,200.00 22.38 209.00 2,124.17 4.85 -0.04 9.58 0.00 3.45 0.01 0.04 9.58 4.88 28.80 MWD OWSG (1, 2) 2,237.95 22.38 209.00 2,159.26 5.17 -0.04 10.64 0.00 3.59 0.01 0.04 10.64 5.16 28.79 MWD OWSG (1, 2) 2,300.00 22.38 209.00 2,216.63 5.17 -0.04 10.64 0.00 3.59 0.01 0.04 10.64 5.16 28.79 MWD OWSG (1, 2) 2,400.00 22.38 209.00 2,309.10 5.51 -0.04 11.72 0.00 3.74 0.01 0.04 11.72 5.46 28.79 MWD OWSG (1, 2) 2,467.91 22.38 209.00 2,371.90 5.14 -0.04 7.70 0.00 2.84 0.72 0.76 7.70 5.07 28.25 D-INC ONLY (INC>100) (2, 3) 2,500.00 22.38 209.00 2,401.57 5.14 -0.04 7.70 0.00 2.84 0.72 0.76 7.70 5.07 28.25 D-INC_ONLY (INC>10°) (2, 3) 2,501.85 22.38 209.00 2,403.28 5.15 -0.04 8.52 0.00 2.85 0.74 0.78 8.52 5.08 28.46 D-INC ONLY (INC>100) (2, 3) 2,531.85 22.38 209.00 2,431.02 5.15 -0.04 8.52 0.00 2.85 0.74 0.78 8.52 5.08 28.46 D-INC_ONLY (INC>10°) (2, 3) 2,581.85 22.38 209.00 2,477.25 5.15 -0.04 9.57 0.00 3.81 0.01 0.04 9.57 5.19 28.61 MWD OWSG (2,4) 2,600.00 22.50 209.64 2,494.03 5.15 -0.04 9.62 0.00 3.82 0.01 0.04 9.62 5.19 28.61 MWD OWSG (2,4) 2,700.00 23.21 213.04 2,586.18 5.22 -0.04 9.97 0.00 3.91 0.01 0.04 9.99 5.24 28.75 MWD OWSG (2,4) 2,800.00 24.00 216.23 2,677.82 5.35 -0.04 10.44 0.00 4.01 0.01 0.04 10.50 5.32 29.15 MWD OWSG (2,4) 2,892.51 24.77 219.02 2,762.08 5.55 -0.04 11.03 0.01 4.12 0.01 0.04 11.14 5.44 29.86 MWD OWSG (2,4) 2,900.00 24.84 219.24 2,768.87 5.55 -0.04 11.03 0.01 4.12 0.01 0.04 11.14 5.44 29.86 MWD OWSG (2,4) 3,000.00 25.74 222.04 2,859.29 5.81 -0.04 11.74 0.01 4.24 0.01 0.04 11.91 5.59 30.85 MWD OWSG (2,4) 3,100.00 26.69 224.67 2,949.01 6.12 -0.04 12.56 0.01 4.37 0.01 0.04 12.80 5.78 32.06 MWD OWSG (2,4) 3,182.12 27.50 226.70 3,022.12 6.48 -0.04 13.49 0.01 4.51 0.01 0.04 13.81 6.01 33.45 MWD OWSG (2,4) 3,200.00 27.69 227.13 3,037.96 6.48 -0.04 13.49 0.01 4.51 0.01 0.04 13.81 6.01 33.45 MWD OWSG (2,4) 3,300.00 28.72 229.42 3,126.09 6.87 -0.04 14.53 0.01 4.67 0.01 0.04 14.92 6.27 34.95 MWD OWSG (2,4) 3,326.21 29.00 230.00 3,149.05 6.98 -0.04 14.82 0.01 4.71 0.01 0.04 15.23 6.34 35.34 MWD OWSG (2,4) 3,400.00 29.00 230.00 3,213.58 7.18 -0.04 15.76 0.01 4.84 0.01 0.04 16.13 6.55 36.44 MWD OWSG (2,4) 3,500.00 29.00 230.00 3,301.04 7.46 -0.04 17.07 0.01 5.02 0.01 0.04 17.40 6.84 37.76 MWD OWSG (2,4) 3,600.00 29.00 230.00 3,388.51 7.77 -0.04 18.43 0.01 5.21 0.01 0.04 18.73 7.15 38.90 MWD OWSG (2,4) 3,700.00 29.00 230.00 3,475.97 8.09 -0.04 19.82 0.01 5.41 0.01 0.04 20.09 7.46 39.88 MWD OWSG (2,4) 3,800.00 29.00 230.00 3,563.43 8.43 -0.04 21.24 0.01 5.62 0.01 0.04 21.48 7.79 40.72 MWD OWSG (2,4) 3,900.00 29.00 230.00 3,650.89 8.79 -0.04 22.67 0.01 5.83 0.01 0.04 22.90 8.13 41.45 MWD OWSG (2,4) 4,000.00 29.00 230.00 3,738.35 9.16 -0.04 24.13 0.01 6.05 0.01 0.04 24.34 8.47 42.08 MWD OWSG (2,4) 4,072.27 29.00 230.00 3,801.56 8.26 -0.04 15.08 0.01 5.92 0.01 0.04 15.34 7.75 37.68 MWD+IFR2+SAG+MS (3,4) 4,100.00 29.00 230.00 3,825.82 8.26 -0.04 15.08 0.01 5.92 0.01 0.04 15.34 7.75 37.68 MWD+IFR2+SAG+MS (3,4) 4,200.00 29.00 230.00 3,913.28 8.54 -0.04 15.70 0.01 6.11 0.01 0.04 15.95 8.02 38.31 MWD+IFR2+SAG+MS (3,4) 4,300.00 29.00 230.00 4,000.74 8.83 -0.04 16.34 0.01 6.31 0.01 0.04 16.57 8.29 38.90 MWD+IFR2+SAG+MS (3,4) 4,301.34 29.00 230.00 4,001.91 9.13 -0.04 16.98 0.01 6.51 0.01 0.04 17.20 8.56 39.43 MWD+IFR2+SAG+MS (3,4) 4,345.94 29.00 230.00 4,040.92 9.13 -0.04 16.98 0.01 6.51 0.01 0.04 17.20 8.56 39.43 MWD+IFR2+SAG+MS (3,4) 4,400.00 29.00 230.00 4,088.20 9.13 -0.04 16.98 0.01 6.51 0.01 0.04 17.20 8.56 39.43 MWD+IFR2+SAG+MS (3,4) 4,500.00 29.00 230.00 4,175.66 9.43 -0.04 17.64 0.01 6.71 0.01 0.04 17.85 8.84 39.93 MWD+IFR2+SAG+MS (3, 4) 4,600.00 29.00 230.00 4,263.13 9.74 -0.04 18.31 0.01 6.91 0.01 0.04 18.51 9.12 40.38 MWD+IFR2+SAG+MS (3,4) 4,700.00 29.00 230.00 4,350.59 10.06 -0.04 18.99 0.01 7.12 0.01 0.04 19.17 9.41 40.80 MWD+IFR2+SAG+MS (3,4) 4,800.00 29.00 230.00 4,438.05 10.38 -0.04 19.67 0.01 7.33 0.01 0.04 19.85 9.70 41.18 MWD+IFR2+SAG+MS (3,4) 4,900.00 29.00 230.00 4,525.51 10.70 -0.04 20.36 0.01 7.54 0.01 0.04 20.53 10.00 41.54 MWD+IFR2+SAG+MS (3,4) 5,000.00 29.00 230.00 4,612.97 11.03 -0.04 21.05 0.01 7.75 0.01 0.04 21.21 10.29 41.87 MWD+IFR2+SAG+MS (3,4) 5,100.00 29.00 230.00 4,700.44 11.36 -0.04 21.75 0.01 7.97 0.01 0.04 21.91 10.59 42.17 MWD+IFR2+SAG+MS (3,4) 5,200.00 29.00 230.00 4,787.90 11.70 -0.04 22.46 0.01 8.19 0.01 0.04 22.61 10.90 42.45 MWD+IFR2+SAG+MS (3,4) 5,300.00 29.00 230.00 4,875.36 12.03 -0.04 23.16 0.01 8.41 0.01 0.04 23.31 11.20 42.71 MWD+IFR2+SAG+MS (3, 4) 5,400.00 29.00 230.00 4,962.82 12.38 -0.04 23.88 0.01 8.64 0.01 0.04 24.02 11.51 42.95 MWD+IFR2+SAG+MS (3,4) 5,500.00 29.00 230.00 5,050.28 12.72 -0.04 24.59 0.01 8.86 0.01 0.04 24.73 11.82 43.17 MWD+IFR2+SAG+MS (3,4) 5,600.00 29.00 230.00 5,137.75 13.07 -0.04 25.31 0.01 9.09 0.01 0.04 25.44 12.13 43.38 MWD+IFR2+SAG+MS (3,4) 5,700.00 29.00 230.00 5,225.21 13.41 -0.04 26.04 0.01 9.32 0.01 0.04 26.16 12.45 43.58 MWD+IFR2+SAG+MS (3,4) 5,800.00 29.00 230.00 5,312.67 13.77 -0.04 26.76 0.01 9.55 0.01 0.04 26.89 12.76 43.76 MWD+IFR2+SAG+MS (3, 4) 5,900.00 29.00 230.00 5,400.13 14.12 -0.04 27.49 0.01 9.79 0.01 0.04 27.61 13.08 43.93 MWD+IFR2+SAG+MS (3, 4) 111312021 3-34:45PM Page 4 COMPASS 5000.15 Build 91E ConocoPhillips Error Ellipse Report Company: ConocoPhillips Alaska Inc WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD1-50 Plan: 39+19.5 @ 58.50usft (D142) Plan: 39+19.5 @ 58.50usft (D142) True Minimum Curvature 2.00 sigma EDT 15 Alaska Prod Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) , (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 6,000.00 29.00 230.00 5,487.59 14.47 -0.04 28.22 0.01 10.02 0.01 0.04 28.34 13.40 44.09 MWD+IFR2+SAG+MS (3,4) 6,100.00 29.00 230.00 5,575.06 14.83 -0.04 28.95 0.01 10.26 0.01 0.04 29.07 13.72 44.23 MWD+IFR2+SAG+MS (3,4) 6,200.00 29.00 230.00 5,662.52 15.19 -0.04 29.69 0.01 10.50 0.01 0.04 29.80 14.04 44.37 MWD+IFR2+SAG+MS (3,4) 6,300.00 29.00 230.00 5,749.98 15.55 -0.04 30.42 0.01 10.75 0.01 0.04 30.53 14.37 44.51 MWD+IFR2+SAG+MS (3,4) 6,348.71 29.00 230.00 5,792.58 15.91 -0.04 31.16 0.01 10.99 0.01 0.04 31.27 14.69 44.63 MWD+IFR2+SAG+MS (3,4) 6,400.00 29.00 230.00 5,837.44 15.91 -0.04 31.16 0.01 10.99 0.01 0.04 31.27 14.69 44.63 MWD+IFR2+SAG+MS (3,4) 6,500.00 29.00 230.00 5,924.90 16.27 -0.04 31.90 0.01 11.23 0.01 0.04 32.01 15.02 44.75 MWD+IFR2+SAG+MS (3,4) 6,600.00 29.00 230.00 6,012.37 16.63 -0.04 32.64 0.01 11.48 0.01 0.04 32.75 15.35 44.86 MWD+IFR2+SAG+MS (3,4) 6,700.00 29.00 230.00 6,099.83 16.99 -0.04 33.39 0.01 11.73 0.01 0.04 33.49 15.68 44.96 MWD+IFR2+SAG+MS (3,4) 6,800.00 29.00 230.00 6,187.29 17.36 -0.04 34.13 0.01 11.98 0.01 0.04 34.23 16.01 45.06 MWD+IFR2+SAG+MS (3,4) 6,871.63 29.00 230.00 6,249.94 17.72 -0.04 34.88 0.01 12.23 0.01 0.04 34.97 16.34 45.15 MWD+IFR2+SAG+MS (3,4) 6,900.00 29.00 230.00 6,274.75 17.72 -0.04 34.88 0.01 12.23 0.01 0.04 34.97 16.34 45.15 MWD+IFR2+SAG+MS (3, 4) 7,000.00 29.00 230.00 6,362.21 18.09 -0.04 35.62 0.01 12.49 0.01 0.04 35.72 16.67 45.24 MWD+IFR2+SAG+MS (3,4) 7,036.21 29.00 230.00 6,393.88 18.22 -0.04 35.89 0.01 12.58 0.01 0.04 35.99 16.79 45.27 MWD+IFR2+SAG+MS (3,4) 7,100.00 27.72 230.00 6,450.02 18.47 -0.04 36.36 0.01 12.74 0.01 0.04 36.46 17.00 45.32 MWD+IFR2+SAG+MS (3,4) 7,103.20 27.66 230.00 6,452.85 18.83 -0.04 37.06 0.01 13.00 0.01 0.04 37.15 17.34 45.40 MWD+IFR2+SAG+MS (3,4) 7,200.00 25.72 230.00 6,539.33 18.83 -0.04 37.06 0.01 13.00 0.01 0.04 37.15 17.34 45.40 MWD+IFR2+SAG+MS (3,4) 7,300.00 23.72 230.00 6,630.16 19.18 -0.04 37.71 0.01 13.25 0.01 0.04 37.81 17.67 45.45 MWD+IFR2+SAG+MS (3,4) 7,347.74 22.77 230.00 6,674.02 19.50 -0.04 38.33 0.01 13.50 0.01 0.04 38.42 18.00 45.50 MWD+IFR2+SAG+MS (3,4) 7,400.00 21.72 230.00 6,722.39 19.50 -0.04 38.33 0.01 13.50 0.01 0.04 38.42 18.00 45.50 MWD+IFR2+SAG+MS (3,4) 7,469.60 20.33 230.00 6,787.35 19.81 -0.04 38.89 0.01 13.74 0.01 0.04 38.99 18.34 45.54 MWD+IFR2+SAG+MS (3,4) 7,500.00 19.72 230.00 6,815.92 19.81 -0.04 38.89 0.01 13.74 0.01 0.04 38.99 18.34 45.54 MWD+IFR2+SAG+MS (3, 4) 7,514.05 19.44 230.00 6,829.15 20.09 -0.04 39.42 0.01 13.98 0.01 0.04 39.51 18.67 45.57 MWD+IFR2+SAG+MS (3,4) 7,600.00 17.72 230.00 6,910.62 20.09 -0.04 39.42 0.01 13.98 0.01 0.04 39.51 18.67 45.57 MWD+IFR2+SAG+MS (3,4) 7,608.55 17.55 230.00 6,918.77 20.35 -0.04 39.90 0.01 14.21 0.01 0.04 40.00 19.00 45.60 MWD+IFR2+SAG+MS (3,4) 7,615.69 17.41 230.00 6,925.58 20.35 -0.04 39.90 0.01 14.21 0.01 0.04 40.00 19.00 45.60 MWD+IFR2+SAG+MS (3,4) 7,700.00 15.72 230.00 7,006.38 20.35 -0.04 39.90 0.01 14.21 0.01 0.04 40.00 19.00 45.60 MWD+IFR2+SAG+MS (3,4) 7,710.37 15.52 230.00 7,016.37 20.42 -0.04 40.04 0.01 14.28 0.01 0.04 40.13 19.10 45.61 MWD+IFR2+SAG+MS (3,4) 7,729.58 15.13 230.00 7,034.90 20.42 -0.04 40.04 0.01 14.28 0.01 0.04 40.13 19.10 45.61 MWD+IFR2+SAG+MS (3, 4) 7,740.90 14.91 230.00 7,045.83 20.59 -0.04 40.35 0.01 14.44 0.01 0.04 40.44 19.33 45.62 MWD+IFR2+SAG+MS (3, 4) 7,800.00 13.72 230.00 7,103.09 20.59 -0.04 40.35 0.01 14.44 0.01 0.04 40.44 19.33 45.62 MWD+IFR2+SAG+MS (3,4) 7,837.24 12.98 230.00 7,139.33 20.81 -0.04 40.75 0.01 14.66 0.01 0.04 40.84 19.65 45.63 MWD+IFR2+SAG+MS (3,4) 7,900.00 11.72 230.00 7,200.63 20.81 -0.04 40.75 0.01 14.66 0.01 0.04 40.84 19.65 45.63 MWD+IFR2+SAG+MS (3,4) 7,904.12 11.64 230.00 7,204.67 21.00 -0.04 41.11 0.01 14.88 0.01 0.04 41.21 19.97 45.64 MWD+IFR2+SAG+MS (3,4) 8,000.00 9.72 230.00 7,298.88 21.00 -0.04 41.11 0.01 14.88 0.01 0.04 41.21 19.97 45.64 MWD+IFR2+SAG+MS (3,4) 8,024.22 9.24 230.00 7,322.77 21.18 -0.04 41.44 0.01 15.10 0.01 0.04 41.53 20.29 45.64 MWD+IFR2+SAG+MS (3,4) 8,100.00 7.72 230.00 7,397.72 21.18 -0.04 41.44 0.01 15.10 0.01 0.04 41.53 20.29 45.64 MWD+IFR2+SAG+MS (3,4) 8,200.00 5.72 230.00 7,497.03 21.33 -0.04 41.73 0.01 15.31 0.01 0.04 41.82 20.60 45.64 MWD+IFR2+SAG+MS (3,4) 8,300.00 3.72 230.00 7,596.68 21.45 -0.04 41.99 0.01 15.52 0.01 0.04 42.08 20.90 45.63 MWD+IFR2+SAG+MS (3,4) 8,327.24 3.18 230.00 7,623.87 21.56 -0.04 42.21 0.01 15.72 0.01 0.04 42.30 21.20 45.62 MWD+IFR2+SAG+MS (3,4) 8,400.00 1.72 230.00 7,696.56 21.56 -0.04 42.21 0.01 15.72 0.01 0.04 42.30 21.20 45.62 MWD+IFR2+SAG+MS (3,4) 8,486.21 0.00 0.00 7,782.76 33.85 0.03 33.41 0.02 15.90 0.01 0.04 42.45 21.44 45.64 MWD+IFR2+SAG+MS (3,4) 8,500.00 0.00 0.00 7,796.55 33.88 0.03 33.43 0.02 15.92 0.01 0.04 42.47 21.47 45.64 MWD+IFR2+SAG+MS (3,4) 8,600.00 0.00 0.00 7,896.55 34.07 0.03 33.59 0.02 16.13 0.01 0.04 42.62 21.74 45.69 MWD+IFR2+SAG+MS (3,4) 8,700.00 0.00 0.00 7,996.55 34.26 0.03 33.76 0.02 16.33 0.01 0.04 42.76 22.01 45.73 MWD+IFR2+SAG+MS (3,4) 8,800.00 0.00 0.00 8,096.55 34.46 0.03 33.92 0.02 16.54 0.01 0.04 42.91 22.28 45.77 MWD+IFR2+SAG+MS (3,4) 8,900.00 0.00 0.00 8,196.55 34.65 0.03 34.10 0.02 16.76 0.01 0.04 43.06 22.56 45.82 MWD+IFR2+SAG+MS (3,4) 9,000.00 0.00 0.00 8,296.55 34.85 0.03 34.27 0.02 16.97 0.01 0.04 43.22 22.84 45.86 MWD+IFR2+SAG+MS (3,4) 9,100.00 0.00 0.00 8,396.55 35.06 0.03 34.45 0.02 17.19 0.01 0.04 43.37 23.12 45.90 MWD+IFR2+SAG+MS (3,4) 9,200.00 0.00 0.00 8,496.55 35.26 0.03 34.63 0.02 17.42 0.01 0.04 43.53 23.40 45.95 MWD+IFR2+SAG+MS (3,4) 9,300.00 0.00 0.00 8,596.55 35.47 0.03 34.81 0.02 17.65 0.01 0.04 43.69 23.68 45.99 MWD+IFR2+SAG+MS (3,4) 9,400.00 0.00 0.00 8,696.55 35.68 0.03 34.99 0.02 17.88 0.01 0.04 43.86 23.97 46.03 MWD+IFR2+SAG+MS (3,4) 9,448.65 0.00 0.00 8,745.20 35.79 0.03 35.18 0.02 10.97 11.07 11.07 43.97 24.18 45.92 0.1NC ONLY (INC>10°) (3,5) 9,483.41 0.00 0.00 8,779.96 35.79 0.03 35.18 0.02 10.97 11.07 11.07 43.97 24.18 45.92 0.1NC ONLY (INC>10°) (3,5) 111312021 3-34:45PM Page 5 COMPASS 5000.15 Build 91E ConocoPhillips Error Ellipse Report Company: ConocoPhillips Alaska Inc WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD1-50 Plan: 39+19.5 @ 58.50usft (D142) Plan: 39+19.5 @ 58.50usft (D142) True Minimum Curvature 2.00 sigma EDT 15 Alaska Prod Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (I 9,491.95 0.00 0.00 8,788.50 35.79 0.03 35.18 0.02 10.97 11.07 11.07 43.97 24.18 45.92 D-INC_ONLY (INC>10°) (3, 5) 9,500.00 0.00 0.00 8,796.55 35.79 0.03 35.18 0.02 10.97 11.07 11.07 43.97 24.18 45.92 0.1NC_ONLY (INC>100) (3, 5) 9,523.41 0.00 0.00 8,819.96 35.79 0.03 35.45 0.02 18.87 0.01 0.04 44.08 24.38 45.51 MWD OWSG (3,6) 9,546.95 0.00 0.00 8,843.50 35.79 0.03 35.45 0.02 18.87 0.01 0.04 44.08 24.38 45.51 MWD OWSG (3,6) 9,600.00 0.00 0.00 8,896.55 35.79 0.03 35.45 0.02 18.87 0.01 0.04 44.08 24.38 45.51 MWD OWSG (3,6) 9,700.00 0.00 0.00 8,996.55 35.79 0.03 35.46 0.02 19.11 0.01 0.04 44.08 24.39 45.51 MWD OWSG (3,6) 9,800.00 0.00 0.00 9,096.55 35.80 0.03 35.46 0.02 19.35 0.01 0.04 44.09 24.40 45.51 MWD OWSG (3,6) 9,900.00 0.00 0.00 9,196.55 35.81 0.03 35.47 0.02 19.60 0.01 0.04 44.10 24.42 45.51 MWD OWSG (3,6) 9,927.70 0.00 0.00 9,224.25 35.83 0.03 35.49 0.02 19.86 0.01 0.04 44.11 24.44 45.51 MWD OWSG (3,6) 10,000.00 0.00 0.00 9,296.55 35.83 0.03 35.49 0.02 19.86 0.01 0.04 44.11 24.44 45.51 MWD OWSG (3,6) 10,100.00 0.00 0.00 9,396.55 35.84 0.03 35.51 0.02 20.12 0.01 0.04 44.12 24.46 45.51 MWD OWSG (3,6) 10,200.00 0.00 0.00 9,496.55 35.86 0.03 35.53 0.02 20.38 0.01 0.04 44.14 24.50 45.51 MWD OWSG (3,6) 10,300.00 0.00 0.00 9,596.55 35.89 0.03 35.55 0.02 20.64 0.01 0.04 44.16 24.53 45.51 MWD OWSG (3,6) 10,400.00 0.00 0.00 9,696.55 35.92 0.03 35.58 0.02 20.91 0.01 0.04 44.19 24.57 45.51 MWD OWSG (3,6) 10,500.00 0.00 0.00 9,796.55 35.95 0.03 35.62 0.02 21.18 0.01 0.04 44.21 24.62 45.51 MWD OWSG (3,6) 10,542.96 0.00 0.00 9,839.51 35.97 0.03 35.63 0.02 21.30 0.01 0.04 44.22 24.64 45.51 MWD OWSG (3,6) Design Targets Target Name I hitimiss target Dip Angle Dip Dir. TVD +N/-S +E/-W Shape (°) (°) (usft) (usft) (usft) CD1-50 T01 Alpine C 1C 0.00 0.00 7,045.83 -2,095.19 -2,080.20 plan hits target center Circle (radius 1,320.00) CD1-50 T02 Sag_River 0.00 0.00 8,779.96 -2,157.16 -2,154.05 - plan hits target center - Circle (radius 1,320.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,467.91 2,371.90 13 3/8" x 16" 13.375 16.000 9,448.65 8,745.20 7-5/8" x 9-7/8" 7.625 9.875 10,542.96 9,839.51 5 1/2" x 6 3/4" 5.500 6.750 111312021 3-34:45PM Page 6 COMPASS 5000.15 Build 91E ConocoPhillips Error Ellipse Report Company: ConocoPhillips Alaska Inc WNS Project: Western North Slope Site: CD1 Alpine Pad Well: Plan: CD1-50 Wellbore: CD1-50 Design: CD1-50 wp07.1 Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD1-50 Plan: 39+19.5 @ 58.50usft (D142) Plan: 39+19.5 @ 58.50usft (D142) True Minimum Curvature 2.00 sigma EDT 15 Alaska Prod Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (1) (�) 2,237.95 2,159.26 C40 Empty 0.00 2,501.85 2,403.28 C30 Empty 0.00 2,892.51 2,762.08 C20 Empty 0.00 3,182.12 3,022.12 C10 Empty 0.00 4,072.27 3,801.56 K3 Empty 0.00 4,301.34 4,001.91 Central/K3_Basal Empty 0.00 4,345.94 4,040.92 Qannik/K2 Empty 0.00 6,348.71 5,792.58 Albian_97 Empty 0.00 6,871.63 6,249.94 Albian_96 Empty 0.00 7,103.20 6,452.85 Albian_95 Empty 0.00 7,347.74 6,674.02 FCS/HRZ Empty 0.00 7,469.60 6,787.35 Kalubik Empty 0.00 7,514.05 6,829.15 K1_Marker Empty 0.00 7,608.55 6,918.77 Kuparuk_C Empty 0.00 7,615.69 6,925.58 LCU Empty 0.00 7,740.90 7,045.83 Alpine _C Empty 0.00 7,837.24 7,139.33 Kingak_F Empty 0.00 7,904.12 7,204.67 Kingak E Empty 0.00 8,024.22 7,322.77 Nuiqsuit Empty 0.00 8,327.24 7,623.87 Nechelik Empty 0.00 9,483.41 8,779.96 Sag_River Empty 9,523.41 8,819.96 Shublik Empty 9,927.70 9,224.25 Ivishak Empty 10,542.96 9,839.51 TD Empty Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 300.00 300.00 0.00 0.00 KOP: Start 1'/100' DLS, 209' TF, for 300' 600.00 599.86 -6.87 -3.81 Start 2°/100' DLS, 0° TF, for 969' 1,569.00 1,540.69 -192.16 -106.52 Hold for962.85' 2,531.85 2,431.02 -512.80 -284.25 Adjust TF to 0°, for 50' 2,581.85 2,477.25 -529.45 -293.48 Start 1.5-/100' DLS, 63.8° TF, for 744.36' 3,326.21 3,149.05 -770.13 -501.06 Hold for 3710' 7,036.21 6,393.88 -1,926.28 -1,878.90 Start 2-/100' DLS, 180° TF, for 693.37' 7,729.58 7,034.90 -2,093.31 -2,077.96 Adjust TF to 180°, for 756.63' 8,486.21 7,782.76 -2,157.16 -2,154.05 Hold for2056.75' 10,542.96 9,839.51 -2,157.16 -2,154.05 TD: 10542.96' MD, 9839.5l' TVD Checked By: Approved By: Date: 111312021 3-34:45PM Page 7 COMPASS 5000.15 Build 91E &' ZS&'&'3%&'&'&'3%&'&'&'3%&'&'3%&'3%&'&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&'3%&'&'3%&'&'3%&'3%'9LHZ&' ZS1RYHPEHU &' ZS&'&'3%&'&'&'3%&'&'&'3%&'3%&'3%&'&'&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&'3%&'&'3%&'&'3%&'&'&'3%'9LHZ&' ZS1RYHPEHU &' ZS&'3%&'&'3%&'&'&'&'3%&'3%&'3%&'&'3%&'&'3%'9LHZ&' ZS2FWREHU 6RXWK  1RUWK   XVIWLQ         :HVW  (DVW   XVIWLQ &'&'3%&'&'&'3%&'&'&'3%&'&'3%&'&'&'3%&'&'&'&' &'3 %&'&'&'3%&'&'3%&'&' &'3 %&'&'&'&'3%&' &'3 %&'&'&'3%&'&'$&'&'3%&' ZS&'ZS4XDUWHU0LOH9LHZ2FWREHU:(//%25(7$5*(7'(7$,/6 0$3&225',1$7(6 1DPH 79' 6KDSH&'7$OSLQH&B3%B40 &LUFOH 5DGLXV &'76DJB5LYHUB3%B40 &LUFOH 5DGLXV &'ZS 6XUIDFH/RFDWLRQ &'ZS 6XUIDFH/RFDWLRQ &'ZS 6XUIDFH&DVLQJ &'ZS 6XUIDFH&DVLQJ &'ZS $OSLQH& &'ZS $OSLQH& &'ZS 6DJ5LYHU &'ZS 6DJ5LYHU &'ZS ,QWHUPHGLDWH&DVLQJ, &'ZS ,QWHUPHGLDWH&DVLQJ, &'ZS 7' &'ZS 7' REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 3 4/5/00 AJR MRT Per A00001 ACS 8 4/16/10 CZ GD CA Per K0100002ACS ALPINE FACILITY 1 3 0 4 T 121 N o 11 N a n U THIS SURVEY o o P� a� CD1 off. rr,. 10 q LOCATION OF THIS SURVEY 4 8 1 z VICINITY MAP NOT TO SCALE / 1 30� 2 / 2 / 5O 4 7p 6 / 9 O 8 O 10 130�12 / 15014 / 170@16 / 19 O / O 18 21 O 20 23o O 22 / / / 250024 26 29 0208 / N/ 31 p@30 ( 33 0032 / CD\�V 3500 34 O,// / 37**36 390@38 N GO/ 410 *40 43@@42 / LEGEND 450044 / 47p046 o EXISTING CONDUCTORS \ 49 @ @ 48 51 °50 NSBURY LoAS&SOCIATES, / INC. SURVEYORS ENGINEERS PLANNERS \ ALPINE MODULE: CD10 UNIT: CD ConocePhllll S ALPINE PROJECT CD1 WELL CONDUCTORS Alaska, Inc. ASBUILT LOCATIONS CADD FILE N0. LK663D1 3/5/99 DRAWING NO: 1 CE-CD10-663D1 PART: I 1 OF 3 REV: 8 REV DATE BY CK APP DESCRIPTION REV DATE BY CK APP DESCRIPTION 3 �4/5/00 AJR MRT Per A00001 ACS 1 8 4/16/10 CZ I GD I CA Per K1000002ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC 5, T 11 N, R 5 E, UMIAT MERIDIAN Well 'Y' 'X' Lat. N Lon W sFNLec LineFW S Gnd Pad CD1-1 5,975,904.92 385 999.99 70. 20' 34.922" 150` 55' 30.868" 222' 2 572' 13.0' 19.5' CD1-2 5,975,897.89 385 992.91 70° 20' 34.852" 150° 55' 31.071" 229, 2 565' 13.0' 19.5' CD1-3 5,975,890.99 385 985.82 70` 20' 34.783" 150° 55' 31.275" 236' 2 558' 13.1' 19.5' CD1-4 5,975,883.83 385 978.79 70` 20' 34.711" 150` 55' 31,478" 243' 2 551' 13.2' 19.5' CD1-5 5,975,876.67 385 971.58 70` 20' 34.640" 150` 55' 31.685" 251' 2 544' 13.3' 19.5' CD1-6 5,975,869.89 385 964.83 70` 20' 34.572" 150` 55' 31.879" 258' 2 538' 13.4' 19.5' CD1-7 5,975,862.73 385,957.33 70° 20' 34.501" 150° 55' 32.095" 265' 2,530' 13.3' 19.5' CD1-8 5,975,855.21 385,950.60 70- 20' 34.426" 150° 55' 32.288" 272' 2,523' 13.2' 19.5' CD1-9 5,975,848.42 385 943.41 70° 20' 34.358" 150° 55' 32.495" 279' 2 517' 13.1' 19.5' CD1-10 5,975,841.34 385 936.18 70` 20' 34.287" 150` 55' 32.703" 286' 2 510' 13.0' 19.5' CD1-11 5,975,834.23 385 929.27 70" 20' 34.216" 150` 55' 32.902" 294' 2,502' 12.9' 19.5' CD1-12 5,975,827.15 385,922.42 70° 20' 34.145" 150° 55' 33.099" 301' 2,496' 12.8' 19.5, CD1-13 5,975,820.00 385 915.06 70' 20' 34.074" 150` 55' 33.311" 308' 2 489' 12.7' 19.5' CD1-14 5,975,812.97 385 908.00 70` 20' 34.004" 150° 55' 33.514" 315' 2 482' 12.6' 19.5' CD1-15 5,975,805.80 385,901.08 70° 20' 33.932" 150° 55' 33.713" 323' 2,474' 12.5' 19.5' CD1-16 5,975,798.86 385 894.08 70` 20' 33.863" 150` 55' 33.914" 330' 2 468' 12.4' 19.5' CD1-17 5,975,791.81 385 886.84 70` 20' 33.793" 150` 55' 34.123" 337' 2 461' 12.3' 19.5' CD1-18 5,975,784.91 385,879.88 70' 20' 33.724" 150` 55' 34.323" 344' 2,454' 12.2' 19.5' CD1-19 5,975,777.92 385 872.81 70` 20' 33.654" 150` 55' 34.526" 351' 2 447' 12.1' 19.5' CD1-20 5,975,770.66 385 865.67 70° 20' 33.581" 150° 55' 34.732" 358' 2 440' 12.0' 19.5' CD1-21 5,975,763.76 385 858.49 70° 20' 33.512" 150° 55' 34.938" 365' 2 433' 11.9' 19.5' *CD1-22 5,975,756.46 385,851.10 70° 20' 33.440" 150° 55' 34.151" 373' 2,426' 11.9' 19.5' CD1-23 5,975,749.31 385 844.44 70` 20' 33.368" 150` 55' 35.342" 380, 2 419' 12.0' 19.5' CD1-24 5,975,742.40 385,837.30 70' 20' 33.299" 150` 55' 35.548" 387' 2,412, 12.2' 19.5' CD1-25 5,975,735.34 385 830.26 70" 20' 33.229" 150` 55' 35.750" 394' 2 405' 12.4' 19.5' CD1-26 5,975,728.10 385 823.14 70` 20' 33.156" 150° 55' 35.955" 401' 2 398' 12.6' 19.5' CD1-27 5,975,721.21 385 816.08 70° 20' 33.088" 150° 55' 36.158" 408' 2 391' 12.8' 19.5' CD1-28 5,975,714.15 385 809.10 70` 20' 33.017" 150` 55' 36.359" 416' 2 384' 13.0' 19.5' CD1-29 5,975,707.14 385 802.20 70` 20' 32.947" 150` 55' 36.558" 422' 2 377' 13.2' 19.5' CD1-30 5,975,700.17 385,794.75 70' 20' 32.877" 150` 55' 36.772" 430' 2,370' 13.4' 19.5' CD1-31 5,975,692.73 385 787.40 70- 20' 32.803" 150` 55' 36.984" 437' 2 362' 13.3' 19.5' CD1-32 5,975,685.92 385 780.68 70` 20' 32.735" 150° 55' 37.177" 444' 2 356' 13.2' 19.5' CD1-33 5,975,678.67 385 773.79 70° 20' 32.663" 150° 55' 37.375" 452' 2 349' 13.1' 19.5' CD1-34 5,975,671.88 385 766.54 70` 20' 32.595" 150` 55' 37.584" 459' 2 342' 12.9' 19.5' CD1-35 5,975,664.72 385 759.63 70` 20' 32.524" 150` 55' 37.782" 466' 2 335' 12.9' 19.5' CD1-36 5,975,657.49 385,752.52 70' 20' 32.451" 150` 55' 37.987" 473' 2,328' 12.8' 19.5' CD1-37 5,975,650.51 385 745.40 70" 20' 32.381" 150` 55' 38.191" 480' 2 321' 12.7' 19.5' CD1-38 5,975,643.79 385 738.44 70° 20' 32.315" 150° 55' 38.391" 487' 2 314' 12.6' 19.5' CD1-39 5,975,636.34 385 731.37 70` 20' 32.240" 150` 55' 38.595" 495' 2 307' 12.5' 19.5' CD1-40 5,975,629.19 385 724.32 70` 20' 32.168" 150` 55' 38.797" 502' 2 300' 12.4' 19.5' CD1-41 5,975,622.37 385 717.40 70` 20' 32.101" 150` 55' 38.997" 509 2 293' 12.3' 19.5' CD1-42 5,975,615.01 385,710.21 70" 20' 32.027" 150` 55' 39.204" 516' 2,286' 12.2' 19.5' CD1-43 5,975,607.63 385 702.97 70" 20' 31.954" 150" 55' 39.412" 523' 2 279' 12.1' 19.5' CD1-44 5,975,600.75 385 696.00 70` 20' 31.885" 150` 55' 39.613" 531' 2 272' 12.1' 19.5' CD1-45 5,975,593.74 385,689.04 70° 20' 31.815" 150° 55' 39.813" 538' 2,265' 12.0' 19.5' CD1-46 5,975,586.84 385,681.76 70` 20' 31.746" 150` 55' 40.022" 545' 2,258' 12.2' 19.5' CD1-47 5,975,579.96 385,674.74 70` 20' 31.677" 150` 55' 40.224" 552' 2,251' 12.1' 19.5' CD1-48 5,975,572.62 385,667.53 70' 20' 31.604" 150` 55' 40.432" 559' 2,244' 12.0' 19.5' CD1-49 5,975,565.51 385,660.62 70" 20' 31.533" 150` 55' 40.630" 566' 2,237' 12.0' 19.5' CD1-X50 5,975,558.47 385,653.72 70° 20' 31.463" 150° 55' 40.829" 574' 2230' 12.0' 19.5' CD1-X51 5,975,551.23 385,646.84 70° 20' 31.391" 150° 55' 41.026" 581' 2223' 12.0' 1 19.5' * CD1-22 CONDUCTOR WAS AS -BUILT 2 11 98. y� ConocePhilli s Alaska, Inc. ALPINE MODULE: CD10 UNIT: CD ALPINE PROJECT CD1 WELL CONDUCTORS ASBUILT LOCATIONS CADD FILE N0. LK663D1 3/5/99 DRAWING NO: 1 CE-CD10-663D1 PART: 1 2 OF 3 REV: 8 REVI DATE IBYI CKIAPPI DESCRIPTION IREVI DATE 113YICKIAPPI DESCRIPTION 3 4/5/00 AJR MRT Per A00001 ACS 1 8 /16/10 CZ GD I CA Per K1000002ACS NOTES 1. ALL COORDINATES ARE ALASKA STATE PLANE, ZONE 4, NAD 27. 2. ELEVATIONS ARE BRITISH PETROLEUM MEAN SEA LEVEL. ORIGINAL GROUND ELEVATIONS ARE INTERPOLATED FROM MICHAEL BAKER JR. DWG. CE-CD10-102, SHT 1, REV. 0. 3. BASIS OF LOCATION AND ELEVATION ARE TEMPORARY ALPINE MONUMENTS 3 & 4 BY LOUNSBURY & ASSOCIATES. 4. DATES OF SURVEY: WELL CONDUCTORS 10, 13, 14, & 16-19 WERE AS -BUILT 3/10/99, REF.FIELD BOOK L99-20, PAGES 3-11. CONDUCTORS 1-3 WERE AS -BUILT 3/25/99, REF: FIELD BOOK L99-24, PG. 28-31, CONDUCTORS 4-6, 9, 20, 21, 23-30, & 35 WERE AS -BUILT 3/29/99, REF: FIELD BOOK L99-23, PG. 65, 67-73. CONDUCTORS 36-43, & 45 WERE AS -BUILT 4/6, 4/9/99, REF: FIELD BOOK L99-26, PG. 35-38, & 48. WELL CONDUCTOR 34 AS -BUILT 3/11/00, REF: FIELD BOOK L00-09, PAGES 2 & 4. WELL CONDUCTOR 44 AS -BUILT 3/20/00, REF: FIELD BOOK L00-09, PAGE 53. WELL CONDUCTORS 31 & 33 WERE AS -BUILT 4/15/00, REF: FIELD BOOK L00-15, PAGES 45-46. 5. WELL CONDUCTOR 7 WAS AS -BUILT BY KUUKPIK/LCMF, 3/19/01, REF: FIELD BOOK LCMF 2001-05, PG. 72-74. 6. WELL CONDUCTORS 46, 47, 48 & 49 WERE AS -BUILT BY KUUKPIK/LCMF, 5/15/03, REF: FIELD BOOKS LCMF 2003-09, PG. 75-76 AND LCMF 2003-10, PG 11-14. 7. WELL CONDUCTORS 8, 11, 12 & 15 WERE AS -BUILT BY KUUKPIK/LCMF, 4/6/04, REF: FIELD BOOKS LCMF 2004-06, PG. 25-26. 8. WELL CONDUCTORS 50 AND 51 WERE AS -BUILT BY KUUKPIK/LCMF, 4/15/10, REF: FIELD BOOKS LCMF 2010-03, PG. 56. �.' OF 44,.Ito SURVEYOR'S CERTIFICATE Gj:,.•' .•' I HEREBY CERTIFY THAT 1 AM PROPERLY REGISTERED 21 '•: 01 AND LICENSED TO PRACTICE LAND SURVEYING IN THE : 49th STATE OF ALASKA AND THAT THIS PLAT REPRESENTS ,,,,,� ""''""""""""""""""""""` o A SURVEY DONE BY ME OR UNDER MY DIRECT 0......%.........................................� SUPERVISION AND THAT ALL DIMENSIONS AND OTHER 0� ; BRIAN G. MANGOLo .� ,�� DETAILS ARE CORRECT AS OF 4/15/00. �� J ' • LS-8626 •;' :� A 111��� �����• LOUNSBURY & ASSOCIATES, INC. SURVEYORS ENGINEERS PLANNERS O Y� ALPINE MODULE: CD10 UNIT: CD ConocePhillips ALPINE PROJECT CD1 WELL CONDUCTORS Alaska, Inc. ASBUILT LOCATIONS CADD FILE NO. LK663D1 3/5/99 DRAWING NO: 1 CE-CD10-663D1 PART: 1 3 OF 3 REV: 8  'DYLHV6WHSKHQ) 2*& )URP6PLWK0DWW0DWW6PLWK#FRQRFRSKLOOLSVFRP! 6HQW7XHVGD\1RYHPEHU30 7R'DYLHV6WHSKHQ) 2*& &F/RHSS9LFWRULD7 2*& %R\HU'DYLG/ 2*& +REEV*UHJ6 6XEMHFW5(>(;7(51$/@5(&58:' 37'  $WWDFKPHQWV:'ZS6XUYH\V[OV[ ,ŝ^ƚĞǀĞ͕ dŚĂŶŬƐĨŽƌƌĞĂĐŚŝŶŐŽƵƚ͘dŽĂŶƐǁĞƌLJŽƵƌƋƵĞƐƚŝŽŶƐ͗ ϭͿWůĞĂƐĞĨŝŶĚĂƚƚĂĐŚĞĚƐƵƌǀĞLJƐŝŶĞdžĐĞůĨŽƌƚŚĞǁĞůů ϮͿdŚĞƉƌĞƐƐƵƌĞƐĐĂůĐƵůĂƚĞĚŝŶƚŚĞ^WŽŶƉĂŐĞϰͬϱŽĨƚŚĞWĚŽĐƵŵĞŶƚĂƌĞĐŽƌƌĞĐƚ͘tŚĂƚ/ŶŽƚŝĐĞĚŚŽǁĞǀĞƌŝƐ ƚŚĂƚƚŚĞ&WWĨŽƌƚŚĞ͚ƌŝůůŝŶŐƵŶĚĞƌϳͲϱͬϴ͟ƐŚŽĞ͛ƐŚŽƵůĚďĞϰϴϲϭƉƐŝ͕ŝŶƐƚĞĂĚŽĨϰϰϬϬƉƐŝ͘dŚĞĂĐƚƵĂů^W ĐĂůĐƵůĂƚĞĚŝƐĐŽƌƌĞĐƚ͕ĂƚϯϴϳϳƉƐŝ͘/ŚĂĚǁŽƌŬĞĚƚŚĞƐĞŽƵƚŝŶĂƐƉƌĞĂĚƐŚĞĞƚĂŶĚŵŝƐƐĞĚƚŚŝƐǁŚĞŶ/ƚƌĂŶƐĨĞƌƌĞĚŝƚ ŽǀĞƌƚŽƚŚĞtŽƌĚŽĐƵŵĞŶƚ͘ ϯͿtĞǁŝůůƉĞƌĨŽƌŵƐƵƌǀĞLJƐĂƚĂŵĂdžŝŵƵŵŽĨĞǀĞƌLJϭϬϬ͛ĨŽƌƚŚĞĞŶƚŝƌĞǁĞůů͕ĂŶĚŵŽƌĞĨƌĞƋƵĞŶƚůLJŝĨŶĞĐĞƐƐĂƌLJĨŽƌ ĂŶLJĐŽŶĐĞƌŶƐ͘^ŝŶĐĞǁĞŚĂǀĞDtƚŽŽůƐŝŶĂůůŽƵƌ,͛Ɛ͕ŝƚŵĂŬĞƐƐĞŶƐĞƚŽĐŽůůĞĐƚĂƐƵƌǀĞLJĂƚĞĂĐŚ ĐŽŶŶĞĐƚŝŽŶ͘ ϰͿtĞǁŝůůƉůĂĐĞĐĞŵĞŶƚĂĐƌŽƐƐƚŚĞ<ƵƉĂƌƵŬŽƵƚŽĨĂďƵŶĚĂŶĐĞŽĨĐĂƵƚŝŽŶ͕ĞǀĞŶƚŚŽƵŐŚǁŚĂƚǁĞĂŶƚŝĐŝƉĂƚĞ ĞŶĐŽƵŶƚĞƌŝŶŐĂƚƚŚŝƐůŽĐĂƚŝŽŶŝƐŶŽƚŐŽŽĚƌĞƐĞƌǀŽŝƌƋƵĂůŝƚLJ͘&ŽƌƚŚĞYĂŶŶŝŬǁĞĚŽĂŶƚŝĐŝƉĂƚĞĞŶĐŽƵŶƚĞƌŝŶŐŐŽŽĚ ƌĞƐĞƌǀŽŝƌ;ŵŝŶŝŵƵŵϱ͛dsŽĨϭϬнŽŚŵƌĞƐŝƐƚŝǀŝƚLJƌŽĐŬͿ͕ĂŶĚďĂƐĞĚŽŶŽĨĨƐĞƚǁĞůůƐŽŶƚŚĞƉĂĚƉĞƌĨŽƌŵŝŶŐĂϮ ƐƚĂŐĞĐĞŵĞŶƚũŽď͕ǁĞƉůĂŶƚŽĚŽƐŽŚĞƌĞĂƐǁĞůů͘ ϱͿ/ĂůƐŽŶŽƚŝĐĞĚĂŶĞƌƌŽƌŽŶŽƵƌƐƵƌĨĂĐĞĐĂƐŝŶŐƉƌĞƐƐƵƌĞƚĞƐƚŽŶƉĂŐĞϱ͘tĞǁŝůůƚĞƐƚƐƵƌĨĂĐĞĐĂƐŝŶŐƚŽϯϱϬϬƉƐŝ͕ŶŽƚ ϰϮϬϬƉƐŝ͘dŚŝƐŝƐĂďŽǀĞŽƵƌ^WŽĨϭϳϯϲƉƐŝďĂƐĞĚŽŶƚŚĞ&ƌĂĐŐƌĂĚŝĞŶƚĂƚƚŚĞƐƵƌĨĂĐĞƐŚŽĞ͕ĂƐǁĞůůĂƐĂďŽǀĞϱϬй ŽĨďƵƌƐƚĨŽƌƚŚĞĐĂƐŝŶŐ͘ /ĨLJŽƵŚĂǀĞĂŶLJĨƵƌƚŚĞƌƋƵĞƐƚŝŽŶƐ͕ƉůĞĂƐĞĚŽŶ͛ƚŚĞƐŝƚĂƚĞƚŽƌĞĂĐŚŽƵƚ͘ dŚĂŶŬƐ͕ 0DWW6PLWK 'ULOOLQJ(QJLQHHU±$ODVND.XSDUXN *67$1&+25$*($/$6.$$72 2)),&( &(// 0$7760,7+#&23&20 &ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗dƵĞƐĚĂLJ͕EŽǀĞŵďĞƌϯϬ͕ϮϬϮϭϵ͗ϯϯD dŽ͗^ŵŝƚŚ͕DĂƚƚфDĂƚƚ͘^ŵŝƚŚϮΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх Đ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗΀ydZE>΁Z͗ZhtͲϬϯ;WdϮϮϭͲϭϬϯͿ CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. DĂƚƚ͕ &ŽƌƚŚĞYĂŶŶŝŬǁ ƌ;ŵŝŶŝŵƵŵϱ͛dsŽĨϭϬнŽŚŵƌĞƐŝƐƚŝǀŝƚLJƌŽĐŬͿ͕   /ŶĂĚĚŝƚŝŽŶƚŽŵLJƌĞƋƵĞƐƚĂŶĚƋƵĞƐƚŝŽŶ͕ďĞůŽǁ͕ŝŶW/͛ƐƉƌŽƉŽƐĞĚŽƉĞƌĂƚŝŽŶƐƉƌŽŐƌĂŵĨŽƌƚŚŝƐĚŝƌĞĐƚŝŽŶĂůůLJĚƌŝůůĞĚǁĞůů͕/ ĚŝĚŶŽƚƐĞĞƐƉĞĐŝĨŝĐŵĞŶƚŝŽŶŽĨĚŝƌĞĐƚŝŽŶĂůƐƵƌǀĞLJƚŽŽůƐƚŽďĞƵƐĞĚŽƌŝŶƚĞŶĚĞĚĨƌĞƋƵĞŶĐLJŽĨĐŽůůĞĐƚŝŽŶĨŽƌĚŝƌĞĐƚŝŽŶĂů ƐƵƌǀĞLJĚĂƚĂ͕ǁŚŝĐŚŚĂǀĞďĞĞŶƉƌŽǀŝĚĞĚǁŝƚŚŵŽƐƚƉĂƐƚĂƉƉůŝĐĂƚŝŽ ŶƐ͘WůĞĂƐĞƌĞǀŝĞǁĂŶĚĞŶƐƵƌĞĐŽŵƉůŝĂŶĐĞǁŝƚŚϮϬ Ϯϱ͘ϬϱϬ͘  tŚĂƚĂƌĞW/͛ƐƉƌŽƉŽƐĞĚĐƌŝƚĞƌŝĂĨŽƌĚĞƚĞƌŵŝŶŝŶŐǁŚĞƚŚĞƌŽƌŶŽƚĐĞŵĞŶƚǁŝůůďĞƉůĂĐĞĚĂĐƌŽƐƐƚŚĞ<ƵƉĂƌƵŬĂŶĚYĂŶŶŝŬ ŝŶƚĞƌǀĂůƐ͍  dŚĂŶŬƐĂŐĂŝŶĂŶĚƐƚĂLJƐĂĨĞ͕ ^ƚĞǀĞĂǀŝĞƐ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ ;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘  &ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'Ϳ ^ĞŶƚ͗DŽŶĚĂLJ͕EŽǀĞŵďĞƌϮϵ͕ϮϬϮϭϰ͗ϱϵWD dŽ͗^ŵŝƚŚ͕DĂƚƚфDĂƚƚ͘^ŵŝƚŚϮΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵ х Đ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗ZhtͲϬϯ;WdϮϮϭͲϭϬϯͿ  DĂƚƚ͕  /͛ŵƌĞǀŝĞǁŝŶŐƚŚĞWĞƌŵŝƚƚŽƌŝůůĂƉƉůŝĐĂƚŝŽŶĨŽƌZhtͲϬϯ͘ŽƵůĚW/ƉůĞĂƐĞƉƌŽǀŝĚĞƚŚĞƉůĂŶŶĞĚĚŝƌĞĐƚŝŽŶĂůƐƵƌǀĞLJ ĚĂƚĂŝŶƐƉƌĞĂĚƐŚĞĞƚŽƌ^//ĐŽŵŵĂͲĚĞůŝŵŝƚĞĚƚĂďůĞĨŽƌŵ͍/ŽŶůLJŶĞĞĚD͕ĂnjŝŵƵƚŚ͕ĂŶĚŝŶĐůŝŶĂƚŝŽŶĚĂƚĂƚŽůŽĂĚŝŶƚŽ ŵLJǁŽƌŬƐƚĂƚŝŽŶ͘,ĂǀŝŶŐƚŚŝƐŝŶĨŽƌŵĂƚŝŽŶŝŶĚŝŐŝƚĂůĨŽƌŵĂƚƐƉĞĞĚƐŵLJƉŽƌƚŝŽŶŽĨƚŚĞĂƉƉůŝĐĂƚŝŽŶƌĞǀŝĞǁ͘  ůƐŽ͕/ŶŽƚŝĐĞĚƚŚĂƚƚŚĞĚŽǁŶŚŽůĞĂŶĚƐƵƌĨĂĐĞŵĂdžŝŵƵŵƉŽƚĞŶƚŝĂůƉƌĞƐƐƵƌĞǀĂůƵĞƐůŝƐƚĞĚŽŶƚŚĞĂƉƉůŝĐĂƚŝŽŶĨŽƌŵĚŽŶŽƚ ŵĂƚĐŚĂŶLJŽĨƚŚĞǀĂůƵĞƐƐŚŽǁŶŝŶƚŚĞ͞^WĂůĐƵůĂƚŝŽŶƐ͟ƐĞĐƚŝŽŶ ;ƉĂŐĞƐϰĂŶĚϱͿ͘tŚŝĐŚĂƌĞĐŽƌƌĞĐƚ͍  dŚĂŶŬƐĂŶĚƐƚĂLJƐĂĨĞ͕ ^ƚĞǀĞĂǀŝĞƐ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ ;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘   Davies, Stephen F (OGQ From: Smith, Matt <Matt.Smith2@conocophillips.com> Sent: Tuesday, December 7, 2021 11:16 AM To: Davies, Stephen F (OGQ Cc: Loepp, Victoria T (OGC); Boyer, David L (OGC); Hobbs, Greg S Subject: RE: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) Steve, Thanks for reaching out again. Please see responses below. If you have any further questions please let me know. Please note that any images shared in this email are confidential Thanks, Matt Smith Drilling Engineer — Alaska Kuparuk 700 G ST ANCHORAGE ALAsxA, ATO-1704 OFFICE: +1.907.263.4324 CELL: +1 432.269.6432 MATPSMITa2C&.coP.com NOTE: Redact CONFIDENTIAL images before public release! SFD 1217/2021 From: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Sent: Thursday, December 02, 20214:43 PM To: Smith, Matt <Matt.Smith2@conocophillips.com> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov> Subject: RE: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) Matt, I have a few questions regarding the diverter waiver variance being sought by CPAI for WD-03. I read through the daily operations summaries in AOGCC's files for nearby disposal well WD-02, and for wells CD3-34, CDl-41, CD1-42, and CDi-43, which have casing shoes near that planned for WD-03. These exceedingly brief operations summaries do not mention any major drilling incidents while drilling surface hole. However, reports for CD3-42 and CD1- 43 mention "slight swabbing" while pulling pipe. We see swabbing commonly in surface hole, due to the soft shales and our BHA's becoming partially packed off. When we observe this, we pump out of the hole, to offset this swab effect via ECD's In Alpine 1, Bergschrund 1, and Bergschrund 2 (the nearest wells to WD-03 that were mud logged; all are within 2 miles), what appear to be gas hydrates occur beneath the base of permafrost. While recorded surface -hole gas measurements were mostly insignificant, Bergschrund 1(located about 4000 feet northeast of WD-03) encountered about 630 units of gas at 1270' MD (equivalent to -1229' TVDSS) with 10.1 ppg mud in the well. These observations were not seen on the closer offset wells and we do not anticipate seeing any gas above the C30, as evidenced by the previous wells on CD3. Q: If a diverter waiver is granted, to ensure safety, what measures will CPAI employ to monitor the well while drilling surface hole and tripping pipe? We'll have a riser, and be able to monitor the well on connections for early recognition, as well as utilizing good tripping practices and monitoring hole fill volumes. Gas measurements on the mud logs appear to elevate rapidly as the Tuluvak is approached. In Alpine 1, the Tuluvak registered up to 450 units of gas while drilling with 10.6 tog mud. Bergschrund 1 encountered 347 units of gas while drilling the Tuluvak with 10.2 ppg mud. We do not anticipate encountering the C30 early based on offset wells and having a good understanding of the areal geology and anticipated formation depths. We plan to have a 30ppg mud weight at TO which has proven to be sufficient for the offset wells on CD1, and we'll perform a 30min flow check prior to TOOH. We've done several shallow hazard studies in WNS over the years. Find below amplitude zoomed into CD1. The lower amplitudes (yellows/reds) show the higher risk of encountering the Tuluvak. CD1 is seen as a low risk area for encountering it. As mentioned, this analysis along with previous experience on CD1, along with our MWD suite and formation. Q: What measures will CPAI employ to ensure that the surface hole does not penetrate the Tuluvak? We will have our MWD suite in the hole with GH/Hes measurements. When we looked at this, we decided to target the interval in yellow below, which provides good offset from the C30 along with better anticipated FIT results. There should be ample markers above this depth, to see with MWD to call this TD depth confidently. Thanks again and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message. including any attachments, contains information from the Alaska oil and Gas conservation Commission (AOGCCI, Rate of Alaska and is for the sole use of the intended reciplent(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saying or forwarding it, and so Mat the AOGCC is aware of the mistake in sending it to you, contact Steve names at 907-793-1224 or steve.daviesraalaskagov. From:Davies, Stephen F (OGC) To:Smith, Matt Cc:Loepp, Victoria T (OGC); Boyer, David L (OGC) Subject:RE: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) Date:Thursday, December 2, 2021 4:43:11 PM Matt, I have a few questions regarding the diverter waiver variance being sought by CPAI for WD-03. I read through the daily operations summaries in AOGCC's files for nearby disposal well WD-02, and for wells CD1-34, CD1-41, CD1-42, and CD1-43, which have casing shoes near that planned for WD- 03. These exceedingly brief operations summaries do not mention any major drilling incidents while drilling surface hole. However, reports for CD1-42 and CD1-43 mention "slight swabbing" while pulling pipe. In Alpine 1, Bergschrund 1, and Bergschrund 2 (the nearest wells to WD-03 that were mud logged; all are within 2 miles), what appear to be gas hydrates occur beneath the base of permafrost. While recorded surface-hole gas measurements were mostly insignificant, Bergschrund 1 (located about 4000 feet northeast of WD-03) encountered about 630 units of gas at 1270' MD (equivalent to -1229' TVDSS) with 10.1 ppg mud in the well. Q: If a diverter waiver is granted, to ensure safety, what measures will CPAI employ to monitor the well while drilling surface hole and tripping pipe? Gas measurements on the mud logs appear to elevate rapidly as the Tuluvak is approached. In Alpine 1, the Tuluvak registered up to 450 units of gas while drilling with 10.6 ppg mud. Bergschrund 1 encountered 347 units of gas while drilling the Tuluvak with 10.2 ppg mud. Q: What measures will CPAI employ to ensure that the surface hole does not penetrate the Tuluvak? Thanks again and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Smith, Matt <Matt.Smith2@conocophillips.com> Sent: Tuesday, November 30, 2021 3:45 PM To: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov>; Hobbs, Greg S <Greg.S.Hobbs@conocophillips.com> Subject: RE: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) Hi Steve, Thanks for reaching out. To answer your questions: 1. Please find attached surveys in excel for the well 2. The pressures calculated in the ASP on page 4/5 of the APD document are correct. What I noticed however is that the FPP for the ‘Drilling under 7-5/8” shoe’ should be 4861 psi, instead of 4400 psi. The actual ASP calculated is correct, at 3877psi. I had worked these out in a spreadsheet and missed this when I transferred it over to the Word Document. 3. We will perform surveys at a maximum of every 100’ for the entire well, and more frequently if necessary for any AC concerns. Since we have MWD tools in all our BHA’s, it makes sense to collect a survey at each connection. 4. We will place cement across the Kuparuk C out of abundance of caution, even though what we anticipate encountering at this location is not good reservoir quality. For the Qannik we do anticipate encountering good reservoir (minimum 5’ TVD of 10+ohm resistivity rock), and based on offset wells on the pad performing a 2 stage cement job, we plan to do so here as well. 5. I also noticed an error on our surface casing pressure test on page 5. We will test surface casing to 3500psi, not 4200psi. This is above our ASP of 1736 psi based on the Frac gradient at the surface shoe, as well as above 50% of burst for the casing. If you have any further questions, please don’t hesitate to reach out. Thanks, Matt Smith Drilling Engineer – Alaska Kuparuk 700 G St AnchorAGe AlASkA, Ato-1704 office: +1.907.263.4324 cell: +1.432.269.6432 mAtt.Smith2@cop.com From: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Sent: Tuesday, November 30, 2021 9:33 AM To: Smith, Matt <Matt.Smith2@conocophillips.com> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov> Subject: [EXTERNAL]RE: CRU WD-03 (PTD 221-103) CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Matt, In addition to my request and question, below, in CPAI’s proposed operations program for this directionally drilled well, I did not see specific mention of directional survey tools to be used or intended frequency of collection for directional survey data, which have been provided with most past applications. Please review and ensure compliance with 20 AAC 25.050. What are CPAI’s proposed criteria for determining whether or not cement will be placed across the Kuparuk and Qannik intervals? Thanks again and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Davies, Stephen F (OGC) Sent: Monday, November 29, 2021 4:59 PM To: Smith, Matt <Matt.Smith2@conocophillips.com> Cc: Loepp, Victoria T (OGC) <victoria.loepp@alaska.gov>; Boyer, David L (OGC) <david.boyer2@alaska.gov> Subject: CRU WD-03 (PTD 221-103) Matt, I’m reviewing the Permit to Drill application for CRU WD-03. Could CPAI please provide the planned directional survey data in spreadsheet or ASCII comma-delimited table form? I only need MD, azimuth, and inclination data to load into my workstation. Having this information in digital format speeds my portion of the application review. Also, I noticed that the downhole and surface maximum potential pressure values listed on the application form do not match any of the values shown in the “ASP Calculations” section (pages 4 and 5). Which are correct? Thanks and stay safe, Steve Davies Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov.  &ƌŽŵ͗^ŵŝƚŚ͕DĂƚƚфDĂƚƚ͘^ŵŝƚŚϮΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵ х ^ĞŶƚ͗dƵĞƐĚĂLJ͕EŽǀĞŵďĞƌϯϬ͕ϮϬϮϭϯ͗ϰϱWD dŽ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх Đ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх͖,ŽďďƐ͕'ƌĞŐ ^ф'ƌĞŐ͘^͘,ŽďďƐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵ х ^ƵďũĞĐƚ͗Z͗΀ydZE>΁Z͗ZhtͲϬϯ;WdϮϮϭͲϭϬϯͿ ,ŝ^ƚĞǀĞ͕ dŚĂŶŬƐĨŽƌƌĞĂĐŚŝŶŐŽƵƚ͘dŽĂŶƐǁĞƌLJŽƵƌƋƵĞƐƚŝŽŶƐ͗ ϭͿWůĞĂƐĞĨŝŶĚĂƚƚĂĐŚĞĚƐƵƌǀĞLJƐŝŶĞdžĐĞůĨŽƌƚŚĞǁĞůů ϮͿdŚĞƉƌĞƐƐƵƌĞƐĐĂůĐƵůĂƚĞĚŝŶƚŚĞ^WŽŶƉĂŐĞϰͬϱŽĨƚŚĞWĚŽĐƵŵĞŶƚĂƌĞĐŽƌƌĞĐƚ͘tŚĂƚ/ŶŽƚŝĐĞĚŚŽǁĞǀĞƌŝƐ ƚŚĂƚƚŚĞ&WWĨŽƌƚŚĞ͚ƌŝůůŝŶŐƵŶĚĞƌϳͲϱͬϴ͟ƐŚŽĞ͛ƐŚŽƵůĚďĞϰϴϲϭƉƐŝ͕ŝŶƐƚĞĂĚŽĨϰϰϬϬƉƐŝ͘dŚĞĂĐƚƵĂů^W ĐĂůĐƵůĂƚĞĚŝƐĐŽƌƌĞĐƚ͕ĂƚϯϴϳϳƉƐŝ͘/ŚĂĚǁŽƌŬĞĚƚŚĞƐĞŽƵƚŝŶĂƐƉƌĞĂĚƐŚĞĞƚĂŶĚŵŝƐƐĞĚƚŚŝƐǁŚĞŶ/ƚƌĂŶƐĨĞƌƌĞĚŝƚ ŽǀĞƌƚŽƚŚĞtŽƌĚŽĐƵŵĞŶƚ͘ ϯͿtĞǁŝůůƉĞƌĨŽƌŵƐƵƌǀĞLJƐĂƚĂŵĂdžŝŵƵŵŽĨĞǀĞƌLJϭϬϬ͛ĨŽƌƚŚĞĞŶƚŝƌĞǁĞůů͕ĂŶĚŵŽƌĞĨƌĞƋƵĞŶƚůLJŝĨŶĞĐĞƐƐĂƌLJĨŽƌ ĂŶLJĐŽŶĐĞƌŶƐ͘^ŝŶĐĞǁĞŚĂǀĞDtƚŽŽůƐŝŶĂůůŽƵƌ,͛Ɛ͕ŝƚŵĂŬĞƐƐĞŶƐĞƚŽĐŽůůĞĐƚĂƐƵƌǀĞLJĂƚĞĂĐŚ ĐŽŶŶĞĐƚŝŽŶ͘ ϰͿtĞǁŝůůƉůĂĐĞĐĞŵĞŶƚĂĐƌŽƐƐƚŚĞ<ƵƉĂƌƵŬŽƵƚŽĨĂďƵŶĚĂŶĐĞŽĨĐĂƵƚŝŽŶ͕ĞǀĞŶƚŚŽƵŐŚǁŚĂƚǁĞĂŶƚŝĐŝƉĂƚĞ ĞŶĐŽƵŶƚĞƌŝŶŐĂƚƚŚŝƐůŽĐĂƚŝŽŶŝƐŶŽƚŐŽŽĚƌĞƐĞƌǀŽŝƌƋƵĂůŝƚLJ͘&ŽƌƚŚĞYĂŶŶŝŬǁĞĚŽĂŶƚŝĐŝƉĂƚĞĞŶĐŽƵŶƚĞƌŝŶŐŐŽŽĚ ƌĞƐĞƌǀŽŝƌ;ŵŝŶŝŵƵŵϱ͛dsŽĨϭϬнŽŚŵƌĞƐŝƐƚŝǀŝƚLJƌŽĐŬͿ͕ĂŶĚďĂƐĞĚŽŶŽĨĨƐĞƚǁĞůůƐŽŶƚŚĞƉĂĚƉĞƌĨŽƌŵŝŶŐĂϮ ƐƚĂŐĞĐĞŵĞŶƚũŽď͕ǁĞƉůĂŶƚŽĚŽƐŽŚĞƌĞĂƐǁĞůů͘ ϱͿ/ĂůƐŽŶŽƚŝĐĞĚĂŶĞƌƌŽƌŽŶŽƵƌƐƵƌĨĂĐĞĐĂƐŝŶŐƉƌĞƐƐƵƌĞƚĞƐƚŽŶƉĂŐĞϱ͘tĞǁŝůůƚĞƐƚƐƵƌĨĂĐĞĐĂƐŝŶŐƚŽϯϱϬϬƉƐŝ͕ŶŽƚ ϰϮϬϬƉƐŝ͘dŚŝƐŝƐĂďŽǀĞŽƵƌ^WŽĨϭϳϯϲƉƐŝďĂƐĞĚŽŶƚŚĞ&ƌĂĐŐƌĂĚŝĞŶƚĂƚƚŚĞƐƵƌĨĂĐĞƐŚŽĞ͕ĂƐǁĞůůĂƐĂďŽǀĞϱϬй ŽĨďƵƌƐƚĨŽƌƚŚĞĐĂƐŝŶŐ͘ /ĨLJŽƵŚĂǀĞĂŶLJĨƵƌƚŚĞƌƋƵĞƐƚŝŽŶƐ͕ƉůĞĂƐĞĚŽŶ͛ƚŚĞƐŝƚĂƚĞƚŽƌĞĂĐŚŽƵƚ͘ dŚĂŶŬƐ͕ 0DWW6PLWK 'ULOOLQJ(QJLQHHU±$ODVND.XSDUXN *67$1&+25$*($/$6.$$72 2)),&( &(// 0$7760,7+#&23&20 &ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'ͿфƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀх ^ĞŶƚ͗dƵĞƐĚĂLJ͕EŽǀĞŵďĞƌϯϬ͕ϮϬϮϭϵ͗ϯϯD dŽ͗^ŵŝƚŚ͕DĂƚƚфDĂƚƚ͘^ŵŝƚŚϮΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх Đ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗΀ydZE>΁Z͗ZhtͲϬϯ;WdϮϮϭͲϭϬϯͿ CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. DĂƚƚ͕ /ŶĂĚĚŝƚŝŽŶƚŽŵLJƌĞƋƵĞƐƚĂŶĚƋƵĞƐƚŝŽŶ͕ďĞůŽǁ͕ŝŶW/͛ƐƉƌŽƉŽƐĞĚŽƉĞƌĂƚŝŽŶƐƉƌŽŐƌĂŵĨŽƌƚŚŝƐĚŝƌĞĐƚŝŽŶĂůůLJĚ ƌŝůůĞĚǁĞůů͕/ ĚŝĚŶŽƚƐĞĞƐƉĞĐŝĨŝĐŵĞŶƚŝŽŶŽĨĚŝƌĞĐƚŝŽŶĂůƐƵƌǀĞLJƚŽŽůƐƚŽďĞƵƐĞĚŽƌŝŶƚĞŶĚĞĚĨƌĞƋƵĞŶĐLJŽĨĐŽůůĞĐƚŝŽŶĨŽƌĚŝƌĞĐƚŝŽŶĂů &ŽƌƚŚĞYĂŶŶŝŬǁĞĚŽĂŶƚŝĐŝƉĂƚĞĞŶĐŽƵŶƚĞƌŝŶŐŐŽŽĚ ƌĞƐĞƌǀŽŝƌ;ŵŝŶŝŵƵŵϱ͛dsŽĨϭϬнŽŚŵƌĞƐŝƐƚŝǀŝƚLJƌŽĐŬͿ͕  ƐƵƌǀĞLJĚĂƚĂ͕ǁŚŝĐŚŚĂǀĞďĞĞŶƉƌŽǀŝĚĞĚǁŝƚŚŵŽƐƚƉĂƐƚĂƉƉůŝĐĂƚŝŽŶƐ͘WůĞĂƐĞƌĞǀŝĞǁĂŶĚĞŶƐƵƌĞĐŽŵƉůŝĂŶĐĞǁŝƚŚϮϬ Ϯϱ͘ϬϱϬ͘  tŚĂƚĂƌĞW/͛ƐƉƌŽƉŽƐĞĚĐƌŝƚĞƌŝĂĨŽƌĚĞƚĞƌŵŝŶŝŶŐǁŚĞƚŚĞƌŽƌŶŽƚĐĞŵĞŶƚǁŝůůďĞƉůĂĐĞĚĂĐƌŽƐƐƚŚĞ<ƵƉĂƌƵŬĂŶĚYĂŶŶŝŬ ŝŶƚĞƌǀĂůƐ͍  dŚĂŶŬƐĂŐĂŝŶĂŶĚƐƚĂLJƐĂĨĞ͕ ^ƚĞǀĞĂǀŝĞƐ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ ;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘  &ƌŽŵ͗ĂǀŝĞƐ͕^ƚĞƉŚĞŶ&;K'Ϳ ^ĞŶƚ͗DŽŶĚĂLJ͕EŽǀĞŵďĞƌϮϵ͕ϮϬϮϭϰ͗ϱϵWD dŽ͗^ŵŝƚŚ͕DĂƚƚфDĂƚƚ͘^ŵŝƚŚϮΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх Đ͗>ŽĞƉƉ͕sŝĐƚŽƌŝĂd;K'ͿфǀŝĐƚŽƌŝĂ͘ůŽĞƉƉΛĂůĂƐŬĂ͘ŐŽǀх͖ŽLJĞƌ͕ĂǀŝĚ>;K'ͿфĚĂǀŝĚ͘ďŽLJĞƌϮΛĂůĂƐŬĂ͘ŐŽǀх ^ƵďũĞĐƚ͗ZhtͲϬϯ;WdϮϮϭͲϭϬϯͿ  DĂƚƚ͕  /͛ŵƌĞǀŝĞǁŝŶŐƚŚĞWĞƌŵŝƚƚŽƌŝůůĂƉƉůŝĐĂƚŝŽŶĨŽƌZhtͲϬϯ͘ŽƵůĚW/ƉůĞĂƐĞƉƌŽǀŝĚĞƚŚĞƉůĂŶŶĞĚĚŝƌĞĐƚŝŽŶĂůƐƵƌǀĞLJ ĚĂƚĂŝŶƐƉƌĞĂĚƐŚĞĞƚŽƌ^//ĐŽŵŵĂͲĚĞůŝŵŝƚĞĚƚĂďůĞĨŽƌŵ͍/ŽŶůLJŶĞĞĚD͕ĂnjŝŵƵƚŚ͕ĂŶĚŝŶĐůŝŶĂƚŝŽŶĚĂƚĂƚŽůŽĂĚŝŶƚŽ ŵLJǁŽƌŬƐƚĂƚŝŽŶ͘,ĂǀŝŶŐƚŚŝƐŝŶĨŽƌŵĂƚŝŽŶŝŶĚŝŐŝƚĂůĨŽƌŵĂƚƐƉĞĞĚƐŵLJƉŽƌƚŝŽŶŽĨƚŚĞĂƉƉůŝĐĂƚŝŽŶƌĞǀŝĞǁ͘  ůƐŽ͕/ŶŽƚŝĐĞĚƚŚĂƚƚŚĞĚŽǁŶŚŽůĞĂŶĚƐƵƌĨĂĐĞŵĂdžŝŵƵŵƉŽƚĞŶƚŝĂůƉƌĞƐƐƵƌĞǀĂůƵĞƐůŝƐƚĞĚŽŶƚŚĞĂƉƉůŝĐĂƚŝŽŶĨŽƌŵĚŽŶŽƚ ŵĂƚĐŚĂŶLJŽĨƚŚĞǀĂůƵĞƐƐŚŽǁŶŝŶƚŚĞ͞^WĂůĐƵůĂƚŝŽŶƐ͟ƐĞĐƚŝŽŶ;ƉĂŐĞƐϰĂŶĚϱͿ͘tŚŝĐŚĂƌĞĐŽƌƌĞĐƚ͍  dŚĂŶŬƐĂŶĚƐƚĂLJƐĂĨĞ͕ ^ƚĞǀĞĂǀŝĞƐ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ;K'Ϳ KE&/Ed/>/dzEKd/͗dŚŝƐĞͲŵĂŝůŵĞƐƐĂŐĞ͕ŝŶĐůƵĚŝŶŐĂŶLJĂƚƚĂĐŚŵĞŶƚƐ͕ĐŽŶƚĂŝŶƐŝŶĨŽƌŵĂƚŝŽŶĨƌŽŵƚŚĞůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ ;K'Ϳ͕^ƚĂƚĞŽĨůĂƐŬĂĂŶĚŝƐĨŽƌƚŚĞƐŽůĞƵƐĞŽĨƚŚĞŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚ;ƐͿ͘/ƚŵĂLJĐŽŶƚĂŝŶĐŽŶĨŝĚĞŶƚŝĂůĂŶĚͬŽƌƉƌŝǀŝůĞŐĞĚŝŶĨŽƌŵĂƚŝŽŶ͘dŚĞƵŶĂƵƚŚŽƌŝnjĞĚƌĞǀŝĞǁ͕ƵƐĞ ŽƌĚŝƐĐůŽƐƵƌĞŽĨƐƵĐŚŝŶĨŽƌŵĂƚŝŽŶŵĂLJǀŝŽůĂƚĞƐƚĂƚĞŽƌĨĞĚĞƌĂůůĂǁ͘/ĨLJŽƵĂƌĞĂŶƵŶŝŶƚĞŶĚĞĚƌĞĐŝƉŝĞŶƚŽĨƚŚŝƐĞͲŵĂŝů͕ƉůĞĂƐĞĚĞůĞƚĞŝƚ͕ǁŝƚŚŽƵƚĨŝƌƐƚƐĂǀŝŶŐŽƌĨŽƌǁĂƌĚŝŶŐ ŝƚ͕ĂŶĚ͕ƐŽƚŚĂƚƚŚĞK'ŝƐĂǁĂƌĞŽĨƚŚĞŵŝƐƚĂŬĞŝŶƐĞŶĚŝŶŐŝƚƚŽLJŽƵ͕ĐŽŶƚĂĐƚ^ƚĞǀĞĂǀŝĞƐĂƚϵϬϳͲϳϵϯͲϭϮϮϰŽƌƐƚĞǀĞ͘ĚĂǀŝĞƐΛĂůĂƐŬĂ͘ŐŽǀ͘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ompanyConocoPhillips Alaska, Inc.Well Name:COLVILLE RIVER UNIT WD-03Initial Class/TypeSER / PENDGeoArea890Unit50360On/Off ShoreOnProgramSERField & PoolWell bore segAnnular DisposalPTD#:2211030COLVILLE RIVER, UNDEFINED WDSP - 120036NA1Permit fee attachedYesEntire well is in ADL0025559.2Lease number appropriateYes3Unique well name and numberNoUndefined Waste Disposal Pool4Well located in a defined poolYes5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYes8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes18Conductor string providedYesSet at 2468' MD; No USDW present19Surface casing protects all known USDWsYes214% excess cement planned20CMT vol adequate to circulate on conductor & surf csgNo21CMT vol adequate to tie-in long string to surf csgYescompleted with perforated cemented liner across Ivishak22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitNA25If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete: CD1-49,CD1-48&CD1-43 SI and bled prior to drilling surface hole26Adequate wellbore separation proposedYesDiverter variance granted per 20 AAC 25.035(h)(2)27If diverter required, does it meet regulationsYesMax formation pressure 5002 psig(11.0 ppg #MW); will drill w/ 9-11.5 ppg EMW28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 4128 psig; will test BOPs to 4500 psig; initial BOP test 5000 psig-SU of Doyon 14230BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYesH2S measures required33Is presence of H2S gas probableNA34Mechanical condition of wells within AOR verified (For service well only)NoH2S measures required. Nearby WD-02 (1.1 miles NE) has injected 7,465,103 bbls of waste since 1999.35Permit can be issued w/o hydrogen sulfide measuresYesRig has sensors and alarms. Expected pressure at intermediate casing shoe is 11.0 ppg EMW, will be36Data presented on potential overpressure zonesNAdrilled with 10.5 to 11.5 ppg mud and MPD. Production hole section will be drilled with 9.5 to37Seismic analysis of shallow gas zonesNA10.5 ppg mud and MPD.38Seabed condition survey (if off-shore)NA39Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate12/7/2021ApprVTLDate1/3/2022ApprSFDDate12/7/2021AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDateJLC 1/4/2022