Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutKuparuk River CPF 3 - ConocoPhillips Alaska, IncPercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000023Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 01/202540,15501,8174318,4520624,5970685,06400569,746(499,852)Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 39,966and Air Force Power generation sale 189 Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT 490100 100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:17:31 -08'00'
1/31/2025CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #3#REF!PLANNEDDATE TIMEVOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR1/29/202512:52:00 AM - 05:32:00 AM 33 Frpzen PIT causing false indicationNWas able to restart VRU. Insulation / heat trace issue is currently being worked1/29/202503:03:00 PM - 04:22:00 PM 10 PIT froze again giving false readingNHeater placed on PIT. Heat tray/heater will be addedTOTAL OVER 1 HOUR 43Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour 43Less than 1 hour 1,817Continuous Assist 0Pilot and Purge 18,452TOTAL FLARED/VENTED 20,312
PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422 Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000023 Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 02/202527,0340742017,1630402,8990447,838070,473140,7720Line 6 is Oooguruk sales 0 Nikaitchuq sales 26,918 and Air Force Power generation sale 116. Transferred from = CPF1 transferred 140,772.KUPARUKRIVER UNIT490100100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com406/03/2025
PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422 Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000023 Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 02/202527,0340742017,1630543,6710588,61000543,410(472,937) Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 26,918 and Air Force Power generation sale 116 Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT490100100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com
2/28/2025
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
#REF!
PLANNED
DATE TIME
VOLUME
MSCF DESCRIPTION OF FLARING EVENT UNPLANNED
ACTION TAKEN TO MINIMIZE
VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR 0
Planned > 1 Hour 0
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour 0
Less than 1 hour 742
Continuous Assist 0
Pilot and Purge 17,163
TOTAL FLARED/VENTED 17,905
PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000023Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 03/202518,23302,24870720,6230588,2590630,07000660,881(600,939)Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 18,125and Air Force Power generation sale 108 Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT 490100 100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:24:51 -08'00'
3/31/2025CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #3#REF!PLANNEDDATE TIMEVOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR3/13/202509:56:00 PM - 11:54:00 PM 445Overpressure protection. Shutting down B GLC for BINReduced IGOR and shut in wells. 3/15/202511:16:00 AM - 12:22:00 PM 262Overpressure protection. OTP pigging and GLC down for BI'sNCut IGOR to drillsites and have OTP hold back gas pressureTOTAL OVER 1 HOUR 707Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour 707Less than 1 hour 2,248Continuous Assist 0Pilot and Purge 20,623TOTAL FLARED/VENTED 23,578
PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422 Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000023 Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 04/20258,71701,532015,4820239,4230265,154068,186317,4700 Line 6 is Oooguruk sales 0 Nikaitchuq sales 8,658, and Air Force Power generation sale 59. Transferred from = CPF1 transferred 317,470KUPARUKRIVER UNIT490100100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com
4/30/2025
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
April-2025
PLANNED
DATE TIME
VOLUME
MSCF DESCRIPTION OF FLARING EVENT UNPLANNED
ACTION TAKEN TO MINIMIZE
VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR 0
Planned > 1 Hour 0
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour 0
Less than 1 hour 1,532
Continuous Assist 0
Pilot and Purge 15,482
TOTAL FLARED/VENTED 17,014
July 16, 2025
To: Recipients of Kuparuk River Unit Gas Disposition Reports
Enclosed are copies of the Gas Disposition Reports for KRU CPF1, CPF2 and CPF3
Facilities during June 2025, along with any Gas Flaring or Venting Incident Reports for
volumes flared over one hour.
If you have any questions, please contact Laurie Beavers at (918) 661-8373.
Sincerely,
Laurie Beavers
Laurie Beavers, Analyst
Production & Revenue Accounting
Enclosures
ConocoPhillips
315 Johnstone Avenue
Bartlesville, OK 74004
0290000023Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 05/202510,07101,03527515,8730206,4170233,671063,821345,4570Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 193 Nikaitchuq sales 9,841, and Air Force Power generation sale 37. Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT 490100 100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com
5/31/2025CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #3May-2025PLANNEDDATE TIMEVOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR5/31/202510:50:00 PM - 12:35:00 AM 275 Emulsion in the primary that carried over NAdd chemicals to a well that was recently worked over when bringing online.TOTAL OVER 1 HOUR 275Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour 275Less than 1 hour 1,035Continuous Assist 0Pilot and Purge 15,873TOTAL FLARED/VENTED 17,183
PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422 Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000023 Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 06/20255,16602,591017,3590127,7570152,873079,254362,8430 Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 5,158, and Air Force Power generation sale 8. Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT490100100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com
6/30/2025
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #3
June-2025
PLANNED
DATE TIME
VOLUME
MSCF DESCRIPTION OF FLARING EVENT UNPLANNED
ACTION TAKEN TO MINIMIZE
VOLUME
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
0
TOTAL OVER 1 HOUR 0
Planned > 1 Hour 0
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour 0
Less than 1 hour 2,591
Continuous Assist 0
Pilot and Purge 17,359
TOTAL FLARED/VENTED 19,950
0290000023Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 07/20255,20301,10311,84619,0260389,9510427,129090,61861,7560Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 0 Nikaitchuq sales 4,861,and Air Force Power generation sale 342. Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT 490100 100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com
7/31/2025CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #3#REF!PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR7/20/202501:14:00 PM - 03:49:00 PM 6,710 Overpressure protectionNVenting gas from 3N/K cross country pipeline7/29/202511:38:00 AM - 01:25:00 PM 5,136 Overpressure protectionNSemi- hot morning. Both gas lift compressors struggled. All GLC recycles went to manual control when we went off PBFG importTOTAL OVER 1 HOUR 11,846Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour 11,846Less than 1 hour 1,103Continuous Assist 0Pilot and Purge 19,026TOTAL FLARED/VENTED 31,975
0290000023Central Processing Facility #3Kuparuk River Unit CONOCOPHILLIPS 08/20259,40507,03312,18419,7040255,2610303,587079,121199,1860Reinjected vol does not include volumes of Oooguruk Gas production reflected on line 17. Line 6 is Oooguruk sales 2,313 Nikaitchuq sales 7,028, and Air Force Power generation sale 64. Line 18 is Oooguruk returned gas.KUPARUKRIVER UNIT 490100 100.00Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com
8/31/2025CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #3#REF!PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR8/2/202511:23:00 AM - 06:39:00 PM 6,922 Overpressure protectionNMassive Flare event. Cut many production wells to try to get off of flare. Abnormally high ambient temperatures throughout the day. 8/15/202503:49:00 AM - 06:11:00 AM 45Plant was upset from 3T-731 due to canceling the flowback. NTreated with chemicals8/15/202506:38:00 AM - 08:47:00 AM 22Plant was upset from 3T-731 due to canceling the flowback. NTreated with chemicals8/16/202502:46:00 AM - 05:34:00 AM 37Plant was upset from 3T-731 due to canceling the flowback. NTreated with chemicals8/19/202508:11:00 AM - 10:34:00 AM 3,576 Tie line repair at 1YNRepaired line8/19/202510:43:00 AM - 01:17:00 PM 1,531 Tie line repair at 1YNRepaired line8/31/2025 03:46:00 PM 22 emulsion and formation clay to facilityNOperating plant in challenged condition8/31/202504:39:00 PM - 06:41:00 PM 293S-713 tripped and coughed. Brought emulsion and formation clay to facilityNIncreased chemical and interface level. Shut in 3T-731 long termTOTAL OVER 1 HOUR 12,134Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour 12,184Less than 1 hour 7,033Continuous Assist 0Pilot and Purge 19,704TOTAL FLARED/VENTED 38,921