HomeMy WebLinkAboutNorthStar - Hilcorp Alaska, LLC2. Facility NameNorthstarPercent72.86%27.14%MCF19. Remarks:Authorized Name and Digital Signature with date:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5.Month/Year of Disposition0290000025 Northstar HILCORP ALASKA LLC January 2025Disposition Volume MCF20. For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.5901508. Flared or vented 1 hour or less7. Reinjected18,263,367NORTHSTAR, NORTHSTAR OIL590100NORTHSTAR, NORTHSTAR-KUPARUK OIL1,9346. Sold0Pool Name Pool Code11. Assist Gas012. Fuel gas used in lease operations10. Pilot and Purge 5,4869. Flared or vented more than 1 hour (see instr.) 3,424545,00513. Other (see instructions) 0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-13)18,819,216124Lease UseMCF15. NGL Gas Equivalent 97,536ConservationMCF16. Purchased gas:Title: Production Analyst SrWaste17. Transferred from: (Off-lease Gas) 0Reviewed by Commissioner:18. Transferred to:0Comm. Comm.I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision?Date of Revision:Contact Phone: 346-237-2399Note: All volumes must be corrected topressure of 14.65 psia and to atemperature of 60° F. Authority 20 AAC25.235.Contact Email:diana.bowling@hilcorp.comForm 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.govDigitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.02.22 20:04:51 -06'00'Diana Bowling (13407):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:18:32 -08'00'
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
1/1/2025 124250 290000025 1/20/2025 13:50 15:17 1/20/2025 U 179
Excess flaring due to shutting down HPA
due to oil leak.
Excess flaring necessary to make
repairs.
1/1/2025 124250 290000025 1/20/2025 13:57 15:52 1/20/2025 U 2459
Excess flaring due to shutting down HPA
due to oil leak.
Excess flaring necessary to make
repairs.
1/1/2025 124250 290000025 1/21/2025 7:10 8:20 1/21/2025 U 786
Excess flaring due to shutting down HPA
due to oil leak.
Excess flaring necessary to make
repairs.
2. Facility NameNorthstarPercent73.14%26.86%MCF19. Remarks:Authorized Name and Digital Signature with date:Date of Revision:Contact Phone: 346-237-2399Note: All volumes must be corrected topressure of 14.65 psia and to atemperature of 60° F. Authority 20 AAC25.235.Contact Email:diana.bowling@hilcorp.comTitle: Production Analyst SrWaste17. Transferred from: (Off-lease Gas) 0Reviewed by Commissioner:18. Transferred to:0Comm. Comm.I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision?Lease UseMCF15. NGL Gas Equivalent 91,852ConservationMCF16. Purchased gas:13. Other (see instructions) 0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-13)17,760,6311131,314509,80911. Assist Gas012. Fuel gas used in lease operations10. Pilot and Purge 4,9559. Flared or vented more than 1 hour (see instr.)6. Sold0Pool Name Pool Code5901508. Flared or vented 1 hour or less7. Reinjected17,244,428NORTHSTAR, NORTHSTAR OIL590100NORTHSTAR, NORTHSTAR-KUPARUK OIL125STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field 4.Operator 5.Month/Year of Disposition0290000025 Northstar HILCORP ALASKA LLC February 2025Disposition Volume MCF20. For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.Form 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.govDigitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.03.15 14:57:43 -05'00'Diana Bowling (13407):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:21:23 -08'00'
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
2/1/2025 124250 290000025 2/27/2025 5:48 9:27 2/27/2025 U 623
Excess flaring due to losing LP
Compressor from frozen transmitter PSHH-
2056.
Excess flaring necessary while
compressor transmitter was fixed.
2/1/2025 124250 290000025 2/27/2025 5:50 9:32 2/27/2025 U 691
Excess flaring due to losing LP
Compressor from frozen transmitter PSHH-
2056.
Excess flaring necessary while
compressor transmitter was fixed.
2. Facility NameNorthstarPercent73.51%26.49%MCF19. Remarks:Authorized Name and Digital Signature with date:Date of Revision:Contact Phone: 346-237-2399Note: All volumes must be corrected topressure of 14.65 psia and to atemperature of 60° F. Authority 20 AAC25.235.Contact Email:diana.bowling@hilcorp.comTitle: Production Analyst SrWaste17. Transferred from: (Off-lease Gas) 0Reviewed by Commissioner:18. Transferred to:0Comm. Comm.I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision?Lease UseMCF15. NGL Gas Equivalent 95,841ConservationMCF16. Purchased gas:13. Other (see instructions) 0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-13)19,068,46868220,271520,25211. Assist Gas012. Fuel gas used in lease operations10. Pilot and Purge 5,4869. Flared or vented more than 1 hour (see instr.)6. Sold0Pool Name Pool Code5901508. Flared or vented 1 hour or less7. Reinjected18,514,603NORTHSTAR, NORTHSTAR OIL590100NORTHSTAR, NORTHSTAR-KUPARUK OIL7,856STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5.Month/Year of Disposition0290000025 Northstar HILCORP ALASKA LLC March 2025DispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.Form 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.govDigitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.04.14 18:12:39 -05'00'Diana Bowling (13407):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:25:15 -08'00'
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
3/1/2025 124250 290000025 3/7/2025 15:49 17:36 3/7/2025 U 7,901
Excess flaring due to facility shutdown for
valve testing.
Excess flaring necessary until after
testing was completed.
3/1/2025 124250 290000025 3/14/2025 18:06 20:01 3/14/2025 U 7,379 Excess flaring due to plant shutdown.
Excess flaring necessary until faulty
hardware replaced and facility
restarted.
3/1/2025 124250 290000025 3/14/2025 22:59 0:02 3/15/2025 U 4,821 Excess flaring due to plant shutdown.
Excess flaring necessary until faulty
hardware replaced and facility
restarted.
3/1/2025 124250 290000025 3/14/2025 23:48 1:58 3/15/2025 U 170 Excess flaring due to plant shutdown.
Excess flaring necessary until faulty
hardware replaced and facility
restarted.
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.05.13 19:58:21 -05'00'Diana Bowling (13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
4/1/2025 124250 290000025 4/29/2025 12:25 14:00 4/29/2025 P 9,798
EXCESS FLARING DUE TO SHUT
DOWN TO REPLACE A SEAL GAS
RUPTURE DISC.
EXCESS FLARING NECESSARY
TO COMPLETE THE
MAINTENANCE.
4/1/2025 124250 290000025 4/29/2025 12:25 14:05 4/29/2025 P 360
EXCESS FLARING DUE TO SHUT
DOWN TO REPLACE A SEAL GAS
RUPTURE DISC.
EXCESS FLARING NECESSARY
TO COMPLETE THE
MAINTENANCE.
2. Facility Name
Northstar
Percent
73.40%
26.60%
MCF
19. Remarks:
Authorized Name and Digital Signature with date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 Northstar HILCORP ALASKA LLC April 2025
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
590150
8. Flared or vented 1 hour or less
7. Reinjected 17,966,254 NORTHSTAR, NORTHSTAR OIL 590100
NORTHSTAR, NORTHSTAR-KUPARUK OIL
39
6. Sold 0
Pool Name Pool Code
11. Assist Gas 0
12. Fuel gas used in lease operations
10. Pilot and Purge 5,309
9. Flared or vented more than 1 hour (see instr.)10,158
523,556
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)18,505,316
121
Lease Use MCF
15. NGL Gas Equivalent 95,340
Conservation MCF
16. Purchased gas:
Title: Production Analyst Sr
Waste
17. Transferred from: (Off-lease Gas)0 Reviewed by Commissioner:
18. Transferred to:0 Comm.Comm.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Revision?Date of Revision:
Contact Phone:346-237-2399
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60° F. Authority 20 AAC
25.235.Contact Email:diana.bowling@hilcorp.com
Form 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.gov
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.06.12 13:29:02 -05'00'Diana Bowling (13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
5/1/2025 124250 290000025 5/5/2025 12:00 13:34 5/5/2025 U 9,216
EXCESS FLARING DUE TO A A BAD
CARD FOR CRUDE STABILIZER
CAUSING A BLOW DOWN EMERGENCY
SHUTDOWN.
EXCESS FLARING NECESSARY
TO RESTART THE PROCESS
FACILITY.
5/1/2025 124250 290000025 5/5/2025 12:26 13:43 5/5/2025 U 379
EXCESS FLARING DUE TO A A BAD
CARD FOR CRUDE STABILIZER
CAUSING A BLOW DOWN EMERGENCY
SHUTDOWN.
EXCESS FLARING NECESSARY
TO RESTART THE PROCESS
FACILITY.
5/1/2025 124250 290000025 5/5/2025 14:04 16:19 5/5/2025 U 1,058
EXCESS FLARING DUE TO A A BAD
CARD FOR CRUDE STABILIZER
CAUSING A BLOW DOWN EMERGENCY
SHUTDOWN.
EXCESS FLARING NECESSARY
TO RESTART THE PROCESS
FACILITY.
5/1/2025 124250 290000025 5/5/2025 16:33 19:39 5/5/2025 U 1,825
EXCESS FLARING DUE TO A A BAD
CARD FOR CRUDE STABILIZER
CAUSING A BLOW DOWN EMERGENCY
SHUTDOWN.
EXCESS FLARING NECESSARY
TO RESTART THE PROCESS
FACILITY.
5/1/2025 124250 290000025 5/5/2025 17:04 22:48 5/5/2025 U 666
EXCESS FLARING DUE TO A A BAD
CARD FOR CRUDE STABILIZER
CAUSING A BLOW DOWN EMERGENCY
SHUTDOWN.
EXCESS FLARING NECESSARY
TO RESTART THE PROCESS
FACILITY.
5/1/2025 124250 290000025 5/5/2025 19:47 23:10 5/5/2025 U 1,935
EXCESS FLARING DUE TO A A BAD
CARD FOR CRUDE STABILIZER
CAUSING A BLOW DOWN EMERGENCY
SHUTDOWN.
EXCESS FLARING NECESSARY
TO RESTART THE PROCESS
FACILITY.
5/1/2025 124250 290000025 5/13/2025 15:34 16:57 5/13/2025 U 6,701
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/13/2025 18:08 19:14 5/13/2025 U 928
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/13/2025 19:09 20:09 5/13/2025 U 92
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/13/2025 20:19 21:28 5/13/2025 U 117
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/13/2025 20:29 22:05 5/13/2025 U 142
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/13/2025 22:22 3:46 5/14/2025 U 538
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/13/2025 22:35 0:03 5/14/2025 U 147
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
5/1/2025 124250 290000025 5/14/2025 1:02 3:21 5/14/2025 U 281
EXCESS FLARING DUE TO PLANT
BLOW DOWN EMERGENCY
SHUTDOWN DUE TO POWER FAILURE
TO 24V CIRCUIT.
EXCESS FLARING NECESSARY
TO START PLANT BACK UP AFTER
REPLACING CABLE.
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.07.15 14:48:17 -05'00'Diana Bowling (13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
6/1/2025 124250 290000025 6/26/2025 8:27 9:45 6/26/2025 P 614
EXCESS FLARING DUE TO
DEPRESSURIZING TEST SEPARATOR
TO UNLOAD NS-23.
EXCESS FLARING NECESSARY
TO COMPLETE THE WELL TEST.
6/1/2025 124250 290000025 6/26/2025 18:12 6:09 6/27/2025 U 2,945
EXCESS FLARING DUE TO
ATTEMPTING TO FLOW NS-23.
EXCESS FLARING OCCURRED
UNTIL TEST WAS COMPLETED.
6/1/2025 124250 290000025 6/28/2025 14:39 22:20 6/28/2025 U 932
EXCESS FLARING DUE TO PLANT
SHUTDOWN.
EXCESS FLARING NECESSARY
AS EQUIPMENT AND WELLS
WERE BROUGHT BACK ONLINE.
6/1/2025 124250 290000025 6/28/2025 15:23 21:53 6/28/2025 U 1,062
EXCESS FLARING DUE TO PLANT
SHUTDOWN.
EXCESS FLARING NECESSARY
AS EQUIPMENT AND WELLS
WERE BROUGHT BACK ONLINE.
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.08.13 16:17:53 -05'00'Diana Bowling (13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
7/1/2025 124250 290000025 7/18/2025 11:23 12:39 7/18/2025 U 5,956
EXCESS FLARING DUE TO FACILITY
SHUT DOWN DUE TO FAULTY FIRE
EYE.
EXCESS FLARING NECESSARY
FOR FACILITY TO RESTART.
7/1/2025 124250 290000025 7/18/2025 12:16 13:35 7/18/2025 U 830
EXCESS FLARING DUE TO FACILITY
SHUT DOWN DUE TO FAULTY FIRE
EYE.
EXCESS FLARING NECESSARY
FOR FACILITY TO RESTART.
Digitally signed by DianaBowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.09.12 15:59:57 -05'00'Diana Bowling(13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
8/1/2025 124250 0290000025 8/3/2025 11:55 14:14 8/3/2025 U 115
S/D LP COMPRESSOR DUE TO HIGH
TEMPS WAIT FOR TEMPS TO DROP
8/1/2025 124250 0290000025 8/3/2025 14:25 18:29 8/3/2025 U 169
S/D LP COMPRESSOR DUE TO HIGH
TEMPS WAIT FOR TEMPS TO DROP
8/1/2025 124250 0290000025 8/3/2025 20:32 7:41 8/4/2025 U 764
S/D LP COMPRESSOR DUE TO HIGH
TEMPS
MINIMIZE FLARING BY REDUCING
NGL THROUGHPUT
8/1/2025 124250 0290000025 8/4/2025 4:03 7:36 8/4/2025 U 343 NONE
MINIMIZE FLARING BY REDUCING
NGL THROUGHPUT
8/1/2025 124250 0290000025 8/14/2025 13:43 14:57 8/14/2025 P 5,028
WATER WASH & RESTART FOR HP-
A/B.
SHUTDOWN & RESTART EACH
COMPRESSOR.
8/1/2025 124250 0290000025 8/14/2025 13:53 15:02 8/14/2025 P 167
WATER WASH & RESTART FOR HP-
A/B.
SHUTDOWN & RESTART EACH
COMPRESSOR.
8/1/2025 124250 0290000025 8/15/2025 2:11 6:15 8/15/2025 P 2,401
ANNUAL FGBESD TEST & START OF
TAR.NONE
8/1/2025 124250 0290000025 8/15/2025 2:12 6:15 8/15/2025 P 493
ANNUAL FGBESD TEST & START OF
TAR.NONE
8/1/2025 124250 0290000025 8/19/2025 9:24 10:37 8/19/2025 P 1,879 STARTUP FACILITY AFTER TAR. PURGE & START EQUIPMENT.
8/1/2025 124250 0290000025 8/19/2025 10:37 13:19 8/19/2025 P 8,853 STARTUP FACILITY AFTER TAR. PURGE & START EQUIPMENT.
8/1/2025 124250 0290000025 8/19/2025 17:50 19:36 8/19/2025 P 169 STARTUP FACILITY AFTER TAR. PURGE & START EQUIPMENT.
8/1/2025 124250 0290000025 8/19/2025 19:46 23:10 8/19/2025 P 307 STARTUP FACILITY AFTER TAR. PURGE & START EQUIPMENT.
8/1/2025 124250 0290000025 8/19/2025 20:04 8:48 8/20/2025 U 993 STARTUP FACILITY AFTER TAR. PURGE & START EQUIPMENT.
8/1/2025 124250 0290000025 8/20/2025 0:13 8:30 8/20/2025 U 792 STARTUP FACILITY AFTER TAR. PURGE & START EQUIPMENT.
8/1/2025 124250 0290000025 8/21/2025 9:06 14:20 8/21/2025 U 1,705
SCHEDULED MAINTENANCE HPA
STARTUP AND MAPPING
NO RESPONSE NEEDED NORMAL
OPERATIONS
8/1/2025 124250 0290000025 8/21/2025 14:30 19:34 8/21/2025 U 1,455
SCHEDULED MAINTENANCE HPA
START UP AND MAPPING
NO RESPONSE NEEDED NORMAL
OPERATIONS
8/1/2025 124250 0290000025 8/22/2025 10:07 11:18 8/22/2025 U 350 LOST ENTIRE PLANT PURGE & START EQUIPMENT
8/1/2025 124250 0290000025 8/22/2025 10:13 12:04 8/22/2025 U 9,991 LOST ENTIRE PLANT PURGE & START EQUIPMENT
8/1/2025 124250 0290000025 8/22/2025 12:22 14:08 8/22/2025 U 10,799 LOST ENTIRE PLANT PURGE & START EQUIPMENT
8/1/2025 124250 0290000025 8/22/2025 12:37 14:25 8/22/2025 U 676 LOST ENTIRE PLANT PURGE & START EQUIPMENT
8/1/2025 124250 0290000025 8/24/2025 1:05 2:18 8/24/2025 U 124
HP-A AND LP COMPRESSORS
SHUTDOWN.RESTART COMPRESSORS.
2. Facility Name
Northstar
Percent
71.29%
28.71%
MCF
19. Remarks:
Authorized Name and Digital Signature with date:
Date of Revision:
Contact Phone:346-237-2399
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60° F. Authority 20 AAC
25.235.Contact Email:diana.bowling@hilcorp.com
Title: Production Analyst Sr
Waste
17. Transferred from: (Off-lease Gas)0 Reviewed by Commissioner:
18. Transferred to:0 Comm.Comm.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Revision?
Lease Use MCF
15. NGL Gas Equivalent 66,639
Conservation MCF
16. Purchased gas:
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)11,556,970
121
0
321,815
11. Assist Gas 0
12. Fuel gas used in lease operations
10. Pilot and Purge 5,309
9. Flared or vented more than 1 hour (see instr.)
6. Sold 0
Pool Name Pool Code
590150
8. Flared or vented 1 hour or less
7. Reinjected 11,224,084 NORTHSTAR, NORTHSTAR OIL 590100
NORTHSTAR, NORTHSTAR-KUPARUK OIL
5,762
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 Northstar HILCORP ALASKA LLC September 2025
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Form 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.gov
2. Facility Name
Northstar
Percent
68.99%
31.01%
MCF
19. Remarks:
Authorized Name and Digital Signature with date:
Date of Revision:
Contact Phone:346-237-2399
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60° F. Authority 20 AAC
25.235.Contact Email:diana.bowling@hilcorp.com
Title: Production Analyst Sr
Waste
17. Transferred from: (Off-lease Gas)0 Reviewed by Commissioner:
18. Transferred to:0 Comm.Comm.
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Revision?
Lease Use MCF
15. NGL Gas Equivalent 93,637
Conservation MCF
16. Purchased gas:
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:
Safety
MCF
14. TOTAL VOLUME (ITEMS 6-13)17,768,145
125
0
449,603
11. Assist Gas 0
12. Fuel gas used in lease operations
10. Pilot and Purge 5,486
9. Flared or vented more than 1 hour (see instr.)
6. Sold 0
Pool Name Pool Code
590150
8. Flared or vented 1 hour or less
7. Reinjected 17,312,293 NORTHSTAR, NORTHSTAR OIL 590100
NORTHSTAR, NORTHSTAR-KUPARUK OIL
764
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000025 Northstar HILCORP ALASKA LLC October 2025
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
Form 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.gov