Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne (GPMA) - Hilcorp North Slope, LLC2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
50.3%
0.1%
0.0%
0.3%
10.0%
0.0%
0.0%
0.0%
0.0%
0.1%
39.3%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,942,076 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 43,317; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,739 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,034;
Block 18: LPC Rich Gas to CGF = 1,804,094
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Hilcorp January-2025
Disposition Volume MCF
6. Sold 161,886
7. Reinjected 8,308,820
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 0
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)13,104,271
11. Assist Gas 145,380
10. Pilot and Purge 12,764
12. Fuel gas used in lease operations.1,014,282 AOGCC Use Only
13. Other (see instructions)3,461,139 Safety:
15. NGL Gas Equivalent 161,886
MCF16. Purchased gas 0 Waste:
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,942,076
18. Transferred to: (Express as a negative #)-1,804,094
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,275
Continuous Assist 14,532
TOTAL FLARED 15,807
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,412
Continuous Assist 73,003
TOTAL FLARED 79,415
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 5,028
Continuous Assist 57,288
TOTAL FLARED 62,316
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 12
Continuous Assist 133
TOTAL FLARED 145
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 37
Continuous Assist 424
TOTAL FLARED 461
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
52.8%
0.3%
0.0%
0.3%
7.0%
0.0%
0.0%
0.1%
0.0%
0.9%
38.7%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,669,786 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 19,224; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,552 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,210;
Block 18: LPC Rich Gas to CGF = 1,652,862
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,669,786
18. Transferred to: (Express as a negative #)-1,652,862
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
15. NGL Gas Equivalent 134,845
MCF16. Purchased gas 0 Waste:
12. Fuel gas used in lease operations.796,612 AOGCC Use Only
13. Other (see instructions)3,319,269 Safety:
12,026,855
11. Assist Gas 126,805
10. Pilot and Purge 11,529
Hilcorp February-2025
Disposition Volume MCF
6. Sold 134,845
7. Reinjected 7,637,401
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 394
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 2 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 2 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 11 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 5 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 17 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 37
Total Flare > 1 Hour 0
Volume Flared 37
Measured Safety Pilot 808
Continuous Assist 8,890
TOTAL FLARED 9,735
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 12 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 12 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 61 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 29 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 83 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 197
Total Flare > 1 Hour 0
Volume Flared 197
Measured Safety Pilot 6,089
Continuous Assist 66,969
TOTAL FLARED 73,255
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 10 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 10 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 49 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 23 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 66 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 158
Total Flare > 1 Hour 0
Volume Flared 158
Measured Safety Pilot 4,467
Continuous Assist 49,138
TOTAL FLARED 53,763
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 0 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 0 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 0 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 0 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 0 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 0 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 0 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 0 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 0 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 0 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 0 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 0 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 0 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 0 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 1 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 29
Continuous Assist 320
TOTAL FLARED 350
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 0 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 0 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 0 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 0 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 0 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
2/1/2025 2:00-2:10 0 1803 LPS Compresor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:00-2:10 0 1804 LPS Compressor shut down due to plant upset.U Depressurization completed.
2/1/2025 2:36-3:12 0 Restart attempt for 1803 LPS Compressor.U Failed to restart due to vibration.
2/1/2025 3:36-3:53 0 Second restart attempt for LPS 1803 Compressor.U Successfully restarted compressor.
2/1/2025 9:30-10:20 1 Restart attempts for 1804 LPS Compressor.U After two failed restarts, compressor stayed online.
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 136
Continuous Assist 1,488
TOTAL FLARED 1,625
2. Facility NamePBU LISBURNE PROD (GPMA)Percent51.7%0.3%0.0%0.2%5.8%0.0%0.0%0.0%0.0%3.2%38.9%Reviewe19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,852,287 and Fuel Gas from Prudhoe = 0Pt McIntyre NGLs at CGF gas equivalent = 16,785; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,906 andLisburne LPC Rich Gas NGLs at CGF gas equivalent =6,493;Block 18: LPC Rich Gas to CGF = 1,811,997STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of DispositionHilcorpMarch-2025DispositionVolume MCF6. Sold137,7777. Reinjected8,334,9549. Flared or vented more than 1 hour (see instr.)2,0978. Flared or vented 1 hour or less140290000009PBU - GPMA14. TOTAL VOLUME (ITEMS 6-13)13,253,88811. Assist Gas141,97210. Pilot and Purge12,73812. Fuel gas used in lease operations.886,126AOGCC Use Only13. Other (see instructions)3,738,210Safety:15. NGL Gas Equivalent137,777MCF16. Purchased gas0Waste:MCFAuthorization >1 hr:Conservation:MCFMCFLease Use: Date of Revision: Authorized Name and Digital Signature with Date:Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com640132640183640152640147Form 10-422 Revised 10/2021COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm.Date17. Transferred from:2,852,28718. Transferred to: (Express as a negative #)-1,811,997I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?20.For production from multiple pools, list contribution of each pool as a % of Total Volume.Pool Code640144640148640187640180Pool NamePrudhoe Bay, Lisburne OilPrudhoe Bay, Niakuk OilPrudhoe Bay, W Bch Tr Un WTRSPPrudhoe Bay, Sag Riv Undef OilPrudhoe Bay, Prudhoe OilPrudhoe Bay, W Beach OilBROOKIAN UND OILPrudhoe Bay, Pt M Stump Is OilPrudhoe Bay, N Prudhoe Bay OilPrudhoe Bay, Raven OilPrudhoe Bay, Pt Mcintyre Oil640165640150640186Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2025.04.15 14:47:19 -08'00'Richard Everett (006020):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:23:16 -08'00'
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 11837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour103/30/2521:59-23:101111837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour111Volume Flared 112Measured Safety Pilot 739Continuous Assist 8,224TOTAL FLARED 9,075
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 81837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour83/30/202521:59-23:101,2151837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour1,215Volume Flared 1,223Measured Safety Pilot 6,582Continuous Assist 73,463TOTAL FLARED 81,268
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 51837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour503/30/2521:59-23:107011837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour701Volume Flared 706Measured Safety Pilot 4,951Continuous Assist 55,102TOTAL FLARED 60,759
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 01837 off gas compressor shut down due to control/instrumentation failure.UTotal Flare <= 1 Hour003/30/2521:59-23:1001837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 01837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour003/30/2521:59-23:1001837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 01837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour003/30/2521:59-23:1071837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour7Volume Flared 7Measured Safety Pilot 38Continuous Assist 433TOTAL FLARED 478
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, BROOKIANLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 01837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour003/30/2521:59-23:1001837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSMar-25VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE3/25/20257:31-7:41 01837 off gas compressor shut down due to control/instrumentation failure.UTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare <= 1 Hour003/30/2521:59-23:10631837 MI Compressor shut down due to control/instrumentation failureUTroubleshot; reloaded 1837, stabilized operations, and facility processes.Total Flare > 1 Hour63Volume Flared 63Measured Safety Pilot 428Continuous Assist 4,750TOTAL FLARED 5,241
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
57.3%
0.3%
0.0%
0.3%
5.5%
0.0%
0.0%
0.0%
0.0%
0.4%
36.2%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,753,416 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 15,667; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,843 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,099;
Block 18: LPC Rich Gas to CGF = 1,763,235
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Hilcorp April-2025
Disposition Volume MCF
6. Sold 116,918
7. Reinjected 8,215,600
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 6
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)12,550,807
11. Assist Gas 143,035
10. Pilot and Purge 12,280
12. Fuel gas used in lease operations.856,984 AOGCC Use Only
13. Other (see instructions)3,205,984 Safety:
15. NGL Gas Equivalent 116,918
MCF16. Purchased gas 0 Waste:
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,753,416
18. Transferred to: (Express as a negative #)-1,763,235
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 0 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 668
Continuous Assist 7,765
TOTAL FLARED 8,433
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 4 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 4
Total Flare > 1 Hour 0
Volume Flared 4
Measured Safety Pilot 7,040
Continuous Assist 82,029
TOTAL FLARED 89,073
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 2 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 2
Total Flare > 1 Hour 0
Volume Flared 2
Measured Safety Pilot 4,441
Continuous Assist 51,706
TOTAL FLARED 56,149
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 0 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 0 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 0 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 41
Continuous Assist 480
TOTAL FLARED 521
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 0 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/6/2025 02:28:00-02:30:00 0 1801 STV-IP Compressor flared due to heat pump shut down.U Flare valve closed
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 90
Continuous Assist 1,055
TOTAL FLARED 1,145
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
56.6%
0.4%
0.0%
0.3%
3.3%
0.0%
0.0%
0.0%
0.0%
0.6%
38.9%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,945,201 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 25,577; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,292 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,202;
Block 18: LPC Rich Gas to CGF = 1,787,991
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Hilcorp May-2025
Disposition Volume MCF
6. Sold 125,675
7. Reinjected 7,313,706
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 1,050
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)12,174,137
11. Assist Gas 147,668
10. Pilot and Purge 12,648
12. Fuel gas used in lease operations.924,519 AOGCC Use Only
13. Other (see instructions)3,648,871 Safety:
15. NGL Gas Equivalent 125,675
MCF16. Purchased gas 0 Waste:
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,945,201
18. Transferred to: (Express as a negative #)-1,787,991
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 1 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 0 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 1 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 1 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 1 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 2 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 6
Total Flare > 1 Hour 0
Volume Flared 6
Measured Safety Pilot 407
Continuous Assist 4,665
TOTAL FLARED 5,078
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 93 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 6 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 5 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 1 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 28 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 29 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 29 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 29 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 29 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 70 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 66 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 88 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 1 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 474
Total Flare > 1 Hour 0
Volume Flared 474
Measured Safety Pilot 7,139
Continuous Assist 83,276
TOTAL FLARED 90,889
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 111 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 8 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 7 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 1 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 34 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 35 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 35 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 35 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 35 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 85 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 79 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 104 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 569
Total Flare > 1 Hour 0
Volume Flared 569
Measured Safety Pilot 4,962
Continuous Assist 58,097
TOTAL FLARED 63,628
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 0 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 0 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 0 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 0 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 0 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 0 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 0 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 0 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 0 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 42
Continuous Assist 489
TOTAL FLARED 531
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 0 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 0 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 0 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/9/2025 01:22-01:25 0 1808 Reinjection Compressor shut down for Maintenance and Water Wash P 1808 depressurization complete
5/9/2025 7:16-7:17 0 1808 Reinjection Compressor depressurized due to Maintenance activities P 1808 depressurization complete
5/10/2025 12:49-12:51 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 14:00-14:01 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:17-15:18 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 15:36-15:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:08-16:09 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 16:36-16:37 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 17:10-17:11 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 18:09-18:12 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 19:18-19:20 0 1808 Reinjection Compressor shut down due to control/instrumentation failure.U Trouble shot; reloaded; stabilized operations.
5/10/2025 22:02-22:06 1 1807 Reinjection Compressor shut down for Maintenance and Water Wash P 1807 depressurization complete
5/11/2025 0:35-0:36 0 1807 Reinjection Compressor Check Valve Integrity Test P 1807 depressurization complete
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 98
Continuous Assist 1,141
TOTAL FLARED 1,240
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
55.1%
0.2%
0.0%
0.3%
5.5%
0.0%
0.0%
0.1%
0.0%
0.3%
38.5%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,034,934 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 24,090; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,267 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,081;
Block 18: LPC Rich Gas to CGF = 1,742,709
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Hilcorp June-2025
Disposition Volume MCF
6. Sold 123,079
7. Reinjected 6,544,782
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 0
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)11,337,239
11. Assist Gas 143,713
10. Pilot and Purge 12,208
12. Fuel gas used in lease operations.864,619 AOGCC Use Only
13. Other (see instructions)3,648,838 Safety:
15. NGL Gas Equivalent 123,079
MCF16. Purchased gas 0 Waste:
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,034,934
18. Transferred to: (Express as a negative #)-1,742,709
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 665
Continuous Assist 7,826
TOTAL FLARED 8,491
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,720
Continuous Assist 79,114
TOTAL FLARED 85,834
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 4,712
Continuous Assist 55,465
TOTAL FLARED 60,177
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 29
Continuous Assist 344
TOTAL FLARED 373
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 82
Continuous Assist 964
TOTAL FLARED 1,046
2. Facility NamePBU LISBURNE PROD (GPMA)Percent56.1%0.2%0.0%0.3%3.0%0.0%0.0%0.3%0.0%0.2%39.9%Reviewe19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,812,732 and Fuel Gas from Prudhoe = 0Pt McIntyre NGLs at CGF gas equivalent = 12,133; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,280 andLisburne LPC Rich Gas NGLs at CGF gas equivalent =5,984;Block 18: LPC Rich Gas to CGF = 1,738,378STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionHilcorp July-2025Disposition Volume MCF6. Sold105,3087. Reinjected8,173,3839. Flared or vented more than 1 hour (see instr.)6928. Flared or vented 1 hour or less710290000009 PBU - GPMA14. TOTAL VOLUME (ITEMS 6-13)11,546,88111. Assist Gas142,27510. Pilot and Purge12,60312. Fuel gas used in lease operations.810,304AOGCC Use Only13. Other (see instructions)2,302,245Safety:15. NGL Gas Equivalent105,308MCF16. Purchased gas0Waste:MCFAuthorization >1 hr:Conservation:MCFMCFLease Use: Date of Revision: Authorized Name and Digital Signature with Date:Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com640132640183640152640147Form 10-422 Revised 10/2021COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm. Date17. Transferred from:2,812,73218. Transferred to: (Express as a negative #)-1,738,378I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?20.For production from multiple pools, list contribution of each pool as a % of Total Volume.Pool Code640144640148640187640180Pool NamePrudhoe Bay, Lisburne OilPrudhoe Bay, Niakuk OilPrudhoe Bay, W Bch Tr Un WTRSPPrudhoe Bay, Sag Riv Undef OilPrudhoe Bay, Prudhoe OilPrudhoe Bay, W Beach OilBROOKIAN UND OILPrudhoe Bay, Pt M Stump Is OilPrudhoe Bay, N Prudhoe Bay OilPrudhoe Bay, Raven OilPrudhoe Bay, Pt Mcintyre Oil640165640150640186Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2025.08.18 13:11:20 -08'00'Richard Everett (006020)
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME(Mscf) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:5621837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 1PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour307/16/25 4:34-6:37 2PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 2Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour4Volume Flared7Measured Safety Pilot371Continuous Assist4,126TOTAL FLARED4,504
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:56131837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 21PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 11800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 31800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour387/16/2025 4:34-6:37 187PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.7/18/2025 7:12-8:13 197Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour384Volume Flared422Measured Safety Pilot7,069Continuous Assist79,851TOTAL FLARED87,342
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:5691837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 18PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 21800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour2907/16/25 4:34-6:37 149PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 151Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour300Volume Flared329Measured Safety Pilot5,070Continuous Assist57,242TOTAL FLARED62,641
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:5601837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour007/16/25 4:34-6:370PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 0Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour0Volume Flared0Measured Safety Pilot0Continuous Assist0TOTAL FLARED0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:5601837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour007/16/25 4:34-6:37 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 0Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour0Volume Flared0Measured Safety Pilot0Continuous Assist0TOTAL FLARED0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME(Mscf) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:5601837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour007/16/25 4:34-6:37 1PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 1Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour2Volume Flared2Measured Safety Pilot28Continuous Assist317TOTAL FLARED347
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, BROOKIANLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME(Mscf) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:56 0 1837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour007/16/25 4:34-6:37 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 0Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour0Volume Flared0Measured Safety Pilot0Continuous Assist0TOTAL FLARED0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJul-25VOLUMEPLANNEDDATETIME(Mscf) DESCRIPTION OF INCIDENTS & CAUSEUNPLANNED ACTION TAKEN TO ELIMINATE CAUSE7/3/2025 12:28-12:5601837 Compressor shutdown to troubleshoot VFD noise and breaker work U Depressurized 1837 Compressor7/15/2025 10:14-10:20 0PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually until the transmitter resumed pressure readlings; returned to normal operations7/29/2025 18:03-18:24 01800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.7/30/2025 20:44-20:45 11800 STV-IP Compressor shutdown due to Control/Instrumentation failure associated with anti-surge control.UStarted offline T/C stablizing facility process and operation.Total Flare <= 1 Hour107/16/25 4:34-6:37 1PO36 on the IP Scrubber to Flare went from 85 psig to Zero causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the transmitter and returned to normal operations.07/18/25 7:12-8:13 1Transmitter on the PO36 on the IP Scrubber to Flare read Zero (again) causing the compressor to recycle.UOpened the 22P00036 valve manually; replaced the Card and returned to normal operations.Total Flare > 1 Hour2Volume Flared3Measured Safety Pilot65Continuous Assist739TOTAL FLARED807
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
57.3%
0.2%
0.0%
0.3%
0.6%
0.0%
0.0%
0.3%
0.0%
0.0%
41.3%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,287,925 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 16,096; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,843 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =5,447;
Block 18: LPC Rich Gas to CGF = 1,457,340
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,287,925
18. Transferred to: (Express as a negative #)-1,457,340
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
15. NGL Gas Equivalent 116,376
MCF16. Purchased gas 0 Waste:
12. Fuel gas used in lease operations.804,886 AOGCC Use Only
13. Other (see instructions)3,043,320 Safety:
11,088,905
11. Assist Gas 149,343
10. Pilot and Purge 12,619
Hilcorp August-2025
Disposition Volume MCF
6. Sold 116,376
7. Reinjected 6,962,277
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 84
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 0 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 1
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 81
Continuous Assist 964
TOTAL FLARED 1,046
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 7 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 42
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 49
Total Flare > 1 Hour 0
Volume Flared 49
Measured Safety Pilot 7,202
Continuous Assist 85,195
TOTAL FLARED 92,446
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 5 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 29
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 34
Total Flare > 1 Hour 0
Volume Flared 34
Measured Safety Pilot 5,265
Continuous Assist 62,349
TOTAL FLARED 67,648
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 0 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 0
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 0 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 0
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 0 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 0
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 30
Continuous Assist 351
TOTAL FLARED 381
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 0 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 0
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/5/2025 11:16-11:18 0 1837 Rich Gas Compressor shut down due to power fault.U Field production cut and 1855 off gas compressor started.
8/22/2025 11:27-12:10 0
1837 Rich Gas Compressor shut down for control valve testing;
1855 off gas compressor blew a fuse upon start-up resulting in
black smoke event.U
Following start-up failure of 1855 off-gas compressor, 1837
Rich Gas Compressor restarted and loaded.
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 41
Continuous Assist 484
TOTAL FLARED 525
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
54.6%
0.1%
0.0%
0.2%
7.6%
0.0%
0.0%
0.3%
0.0%
0.1%
37.2%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,187,426 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 15,252; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,361 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,3686;
Block 18: LPC Rich Gas to CGF = 1,733,394
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,187,426
18. Transferred to: (Express as a negative #)-1,733,394
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
15. NGL Gas Equivalent 132,443
MCF16. Purchased gas 0 Waste:
12. Fuel gas used in lease operations.964,890 AOGCC Use Only
13. Other (see instructions)3,699,907 Safety:
12,430,229
11. Assist Gas 146,990
10. Pilot and Purge 12,424
Hilcorp November-2025
Disposition Volume MCF
6. Sold 132,443
7. Reinjected 7,473,575
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 0
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 943
Continuous Assist 11,165
TOTAL FLARED 12,108
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,781
Continuous Assist 80,209
TOTAL FLARED 86,990
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 4,648
Continuous Assist 55,007
TOTAL FLARED 59,655
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 19
Continuous Assist 217
TOTAL FLARED 236
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 33
Continuous Assist 392
TOTAL FLARED 425
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
53.0%
0.1%
0.0%
0.2%
8.7%
0.0%
0.0%
0.3%
0.0%
0.0%
37.8%
Reviewe
d by:
19. Remarks:Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,140,885 and Fuel Gas from Prudhoe = 0
Pt McIntyre NGLs at CGF gas equivalent = 11,646; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,567 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,361;
Block 18: LPC Rich Gas to CGF = 1,812,292
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Hilcorp December-2025
Disposition Volume MCF
6. Sold 132,619
7. Reinjected 7,735,346
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 0
0290000009 PBU - GPMA
14. TOTAL VOLUME (ITEMS 6-13)12,889,543
11. Assist Gas 152,934
10. Pilot and Purge 12,920
12. Fuel gas used in lease operations.1,030,273 AOGCC Use Only
13. Other (see instructions)3,825,451 Safety:
15. NGL Gas Equivalent 132,619
MCF16. Purchased gas 0 Waste:
MCFAuthorization >1 hr:
Conservation:MCF
MCFLease Use:
Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
640132
640183
640152
640147
Form 10-422 Revised 10/2021
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Date
17. Transferred from:2,140,885
18. Transferred to: (Express as a negative #)-1,812,292
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?
20. For production from multiple pools, list contribution of each pool as a % of Total Volume.
Pool Code
640144
640148
640187
640180
Pool Name
Prudhoe Bay, Lisburne Oil
Prudhoe Bay, Niakuk Oil
Prudhoe Bay, W Bch Tr Un WTRSP
Prudhoe Bay, Sag Riv Undef Oil
Prudhoe Bay, Prudhoe Oil
Prudhoe Bay, W Beach Oil
BROOKIAN UND OIL
Prudhoe Bay, Pt M Stump Is Oil
Prudhoe Bay, N Prudhoe Bay Oil
Prudhoe Bay, Raven Oil
Prudhoe Bay, Pt Mcintyre Oil
640165
640150
640186
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,118
Continuous Assist 13,231
TOTAL FLARED 14,349
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,847
Continuous Assist 81,042
TOTAL FLARED 87,889
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 4,916
Continuous Assist 58,194
TOTAL FLARED 63,110
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 16
Continuous Assist 191
TOTAL FLARED 207
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, BROOKIAN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-25
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 23
Continuous Assist 276
TOTAL FLARED 299