Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutBeluga River - Hilcorp Alaska, LLC2. Facility NameBeluga RiverPercent100.00%Official UseAuthorization Safety MCFLease Use MCFConservati MCFWaste MCFReviewed by:COMMISSIONERComm. Comm.19. Remarks:Authorized Name and Digital Signature with date:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition2830000001 BELUGA RIVER Hilcorp Alaska.LLC January-25Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. Sold1329865Pool NamePool Code7. Reinjected0BELUGA GAS 0805008. Flared or vented 1 hour or less 689. Flared or vented more than 1 hour (see instr.) 49210. Pilot and Purge011. Assist Gas013. Other (see instructions)014. TOTAL VOLUME (ITEMS 6-13)136079912. Fuel gas used in lease operations. 30374Production Analyst15. NGL Gas Equivalent016. Purchased gas017. Transferred from:0Contact Phone: 713.289.2889Note: All volumes must be corrected to pressureof 14.65 psia and to a temperature of 60° F.Authority 20 AAC 25.235.Contact Email: tabitha.timothy@hilcorp.com18. Transferred to: (Express as a negative #) 0I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision? Date of Revision:Title:Form 10-422 Revised 04/2020 20 AAC 25.235 Submit in PDF form to aogcc.reporting@alaska.govDigitally signed by Tabitha Timothy (12086)DN: cn=Tabitha Timothy (12086)Reason: I am approving this documentDate: 2025.02.19 10:14:16 -06'00'Tabitha Timothy (12086):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:16:43 -08'00'
Excess Flare ReportStart: 01/01/2025 End: 01/31/2025BELUGA RIVER UNITBegin Date & TimeEnd Date & TimeEvent Gas MCFPlannedDescription of IncidentCategoryWell NameWell APIReasonWere All BMP Plan Steps Taken?Steps Taken to Minimize ReoccurrenceActions Taken01/07/2025 12:15 AM 01/07/2025 01:30 AM 80.0 Y Excess venting due to liquids unloading at well 214-13.VENT BRU 214-13 (Beluga Sterling PA) 50-283-20187-00-00 Liquids Unloading Y Liquids unloading. Excess venting necessary to complete the procedure.01/10/2025 01:00 PM01/10/2025 02:00 PM75.0Excess venting due to liquids unloading at well 214-26. VENTBRU 214-26L (Beluga Sterling PA) 50-283-20083-00-Liquids UnloadingYLiquids unloading.Excess venting necessary to handle excess gas.01/12/2025 10:15 AM 01/12/2025 11:45 AM 20.0 Y Excess venting due to unloading 242-04 during 1006/1007 outage. VENT BRU 242-04 (Beluga Sterling PA) 50-283-20164-00- EQUIPMENT OUTAGEY Equipment outage. Excess venting necessary until equipment back online.01/12/2025 04:00 PM01/12/2025 05:00 PM50.0YExcess venting due to liquids unloading at well 214-26.VENTBRU 214-26L (Beluga Sterling PA) 50-283-20083-00-Liquids UnloadingYLiquids unloading.Excess venting necessary to complete the procedure.01/16/2025 12:00 PM 01/16/2025 03:00 PM 192.0 Y Excess venting due to liquids unloading at well 214-26.VENT BRU 214-26L (Beluga Sterling PA) 50-283-20083-00- Liquids Unloading Y Liquids unloading. Excess venting necessary to complete the procedure.01/20/2025 02:15 PM01/20/2025 03:15 PM30.0Excess venting due to liquids unloading at well 242-04.VENTBRU 242-04 (Beluga Sterling PA) 50-283-20164-00-Liquids UnloadingYLiquids unloading.Excess venting necessary to complete the procedure.01/31/2025 01:30 AM 01/31/2025 04:00 AM 30.0 Y Excess venting due to unloading 214-26 while C-7 was down.VENT BRU 214-26L (Beluga Sterling PA) 50-283-20083-00- UPSET Y Upset. Excess venting necessary until equipment back online.01/31/2025 07:30 AM01/31/2025 08:30 AM15.0YExcess venting due to unloading 214-26 while C-7 was down.VENTBRU 214-26L (Beluga Sterling PA) 50-283-20083-00-UPSETYUpset.Excess venting necessary until equipment back online.Total > 1 Hour:492.0Digitally signed by Tabitha Timothy (12086)DN: cn=Tabitha Timothy (12086)Reason: I am approving this documentDate: 2025.02.18 14:45:07 -06'00'Tabitha Timothy (12086)
2. Facility NameBeluga RiverPercent100.00%Official UseAuthorization Safety MCFLease Use MCFConservati MCFWaste MCFReviewed by:COMMISSIONERComm. Comm.19. Remarks:Authorized Name and Digital Signature with date:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition2830000001 BELUGA RIVER Hilcorp Alaska.LLC February-25Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. Sold1192889Pool NamePool Code7. Reinjected0BELUGA GAS 0805008. Flared or vented 1 hour or less 849. Flared or vented more than 1 hour (see instr.) 18510. Pilot and Purge011. Assist Gas013. Other (see instructions)014. TOTAL VOLUME (ITEMS 6-13)122363612. Fuel gas used in lease operations. 30478Production Analyst15. NGL Gas Equivalent016. Purchased gas017. Transferred from:0Contact Phone: 346-237-2399Note: All volumes must be corrected to pressureof 14.65 psia and to a temperature of 60° F.Authority 20 AAC 25.235.Contact Email: diana.bowling@hilcorp.com18. Transferred to: (Express as a negative #) 0I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision? Date of Revision:Title:Form 10-422 Revised 04/2020 20 AAC 25.235 Submit in PDF form to aogcc.reporting@alaska.gove and Digital e and Digital gnd DiDigitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.03.18 14:10:45 -05'00'Diana Bowling (13407):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:20:37 -08'00'
BELUGA RIVER UNITStart: 02/01/2025 End: 02/28/2025Excess Flare ReportBegin Date & TimeEnd Date & TimeEvent Gas MCFPlannedDescription of IncidentCategoryReasonSteps Taken to Minimize ReoccurrenceActions Taken02/05/2025 11:30 AM 02/05/2025 01:00 PM 47.0 Y Excess venting due to unloading 214-26 while C-7 was down.VENT Liquids Unloading Liquids unloading. Excess venting necessary until compressor back online.02/17/2025 10:45 AM02/17/2025 12:45 PM72.0YExcess venting due to unloading214-26 while C-7 wasdown.VENTLiquids UnloadingLiquids unloading.Excess venting necessary until compressor back online.02/22/2025 09:30 PM 02/22/2025 10:30 PM 66.0 Y Excess venting due to unloading at well 214-16.VENT Liquids Unloading Liquids unloading. Excess venting necessary to keep well alive.Total > 1 Hour:185.0
2. Facility NameBeluga RiverPercent100.00%Official UseOnlyAuthorization Safety MCFLease Use MCFConservationMCFWaste MCFReviewed by:COMMISSIONERComm. Comm.19. Remarks:Authorized Name and Digital Signature with date:Contact Phone: 346-237-2399Note: All volumes must be corrected to pressureof 14.65 psia and to a temperature of 60° F.Authority 20 AAC 25.235.Contact Email: diana.bowling@hilcorp.com18. Transferred to: (Express as a negative #) 0I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision? Date of Revision:Title: Production Analyst15. NGL Gas Equivalent016. Purchased gas017. Transferred from:013. Other (see instructions)014. TOTAL VOLUME (ITEMS 6-13)130525712. Fuel gas used in lease operations. 3321211. Assist Gas09. Flared or vented more than 1 hour (see instr.) 5710. Pilot and Purge0BELUGA GAS 0805008. Flared or vented 1 hour or less 682830000001 BELUGA RIVER Hilcorp Alaska.LLC March-25Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. Sold1271920Pool NamePool Code7. Reinjected0STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Revised 04/2020 20 AAC 25.235 Submit in PDF form to aogcc.reporting@alaska.govDigitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.04.18 12:19:05 -05'00'Diana Bowling (13407):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.08.05 11:24:17 -08'00'
BELUGA RIVER UNITStart: 03/01/2025 End: 03/31/2025Excess Flare ReportBegin Date & TimeEnd Date & TimeEvent Gas MCFPlannedDescription of IncidentCategoryReasonSteps Taken to Minimize ReoccurrenceActions Taken03/03/2025 12:00 PM 03/03/2025 01:00 PM 17.0 Y Excess venting due to liquids unloading at well 222-24.VENT Liquids Unloading Liquids unloading. Excess venting necessary to unload well.03/05/2025 04:00 PM03/05/2025 05:10 PM40.0YWell loaded up with erratic flow rate. Vented to tank, unload. 7 BBL fluid to surface.VENTLiquids UnloadingTotal > 1 Hour:57.0
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.05.21 00:32:22 -05'00'Diana Bowling (13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
4/1/2025 124250 2830000001 4/1/2025 0:00:00 3:45:00 4/1/2025 P 150 EXCESS VENTING DUE TO C7 COMPRESSOR
GOING DOWN ON KNOCK ALARM. VENTED 214-
26 WHILE COMPRESSOR WAS DOWN.
EXCESS VENTING NECESSARY WHILE COMPRESSOR WAS
DOWN.
BRU
4/1/2025 124250 2830000001 4/7/2025 19:10:00 20:30:00 4/7/2025 P 8 EXCESS VENTING DUE TO VENTING AT WELL
214-26 AFTER SSSV TRIPPED, TO VERIFY VALVE
WAS OPEN.
EXCESS VENTING NECESSARY TO COMPLETE VALVE
VERIFICATION.
BRU
4/1/2025 124250 2830000001 4/8/2025 4:00:00 15:00:00 4/8/2025 P 550 EXCESS VENTING DUE TO UNLOADING LIQUIDS
AT WELL 214-26.
EXCESS VENTING NECESSARY TO COMPLETE PROCEDURE. BRU
4/1/2025 124250 2830000001 4/12/2025 10:28:00 11:28:00 4/12/2025 P 34 EXCESS VENTING DUE TO UNLOADING 223-24
DURING C2 COMPRESSOR MAINTENANCE.
EXCESS VENTING NECESSARY TO COMPLETE PROCEDURE. BRU
4/1/2025 124250 2830000001 4/12/2025 13:33:00 14:33:00 4/12/2025 P 88 EXCESS VENTING DUE TO UNLOADING WELL
214-26 DURING C7 COMPRESSOR SHUTDOWN.
EXCESS VENTING NECESSARY DURING DURATION OF
SHUTDOWN.
BRU
4/1/2025 124250 2830000001 4/15/2025 16:15:00 17:15:00 4/15/2025 P 30 EXCESS VENTING DUE TO WELL 233-23
LOADING WITH LIQUIDS DURING CHOKE
UPSIZE.
EXCESS VENTING NECESSARY TO COMPLETE PROCEDURE. BRU
4/1/2025 124250 2830000001 4/16/2025 14:45:00 17:30:00 4/16/2025 P 1 EXCESS VENTING DUE TO BLEEDING OFF N2 AT
WELL 241-26.
EXCESS VENTING NECESSARY TO COMPLETE PROCEDURE. BRU
4/1/2025 124250 2830000001 4/28/2025 15:30:00 18:00:00 4/28/2025 P 45 EXCESS VENTING DUE TO LIQUIDS UNLOADING
AT WELL 212-35T.
EXCESS VENTING NECESSARY TO COMPLETE PROCEDURE. BRU
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.06.20 17:36:32 -05'00'Diana Bowling (13407)
BELUGA RIVER UNITStart: 05/01/2025 End: 05/31/2025Excess Flare ReportBegin Date & TimeEnd Date & TimeEvent Gas MCFPlannedDescription of IncidentCategoryReasonSteps Taken to Minimize ReoccurrenceActions Taken05/02/2025 10:30 PM 05/02/2025 11:50 PM 5.0 Y Excess venting due to nitrogen blanket.VENT BLOW DOWN WELLBlow down well. Excess venting necessary to vent off nitrogen prior to bringing well back online.05/13/2025 01:30 PM05/13/2025 06:00 PM250.0YExcess venting due to scheduled maintenance.VENTSCHEDULEDMAINTENANCEScheduled maintenance.Excess venting necessary to keep 214-26 unloaded during maintenance.05/15/2025 07:00 AM 05/15/2025 09:00 AM 40.0 Y Excess venting due to liquids unloading at well 223-23.VENT Liquids Unloading Liquids unloading. Excess venting necessary to complete procedure.Total > 1 Hour:295.0
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.07.18 14:43:25 -05'00'Diana Bowling (13407)
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
6/1/2025 124250 2830000001 6/16/2025 15:30:00 17:00:00 6/16/2025 P 120 EXCESS VENTING DUE TO LIQUIDS UNLOADING
AT WELL 221-26.
EXCESS VENTING NECESSARY TO KEEP WELL UNLOADED. BRU
6/1/2025 124250 2830000001 6/21/2025 2:00:00 3:00:00 6/21/2025 P 35 EXCESS VENTING DUE TO LIQUIDS UNLOADING
AT WELL 221-26.
EXCESS VENTING NECESSARY TO UNLOAD THE WELL. BRU
6/1/2025 124250 2830000001 6/25/2025 14:00:00 16:15:00 6/25/2025 P 40 EXCESS VENTING DUE TO LIQUIDS UNLOADING
AT WELL 223-24.
EXCESS VENTING NECESSARY TO UNLOAD THE WELL. BRU
6/1/2025 124250 2830000001 6/26/2025 0:00:00 14:00:00 6/26/2025 U 0 EXCESS VENTING DUE TO UNLOADING WELL
221-26.
EXCESS VENTING NECESSARY TO KEEP WELL FLOWING. BRU
6/1/2025 124250 2830000001 6/30/2025 0:00:00 14:45:00 6/30/2025 U 0 EXCESS VENTING DUE TO UNLOADING WELL
214-26L.
EXCESS VENTING NECESSARY TO KEEP WELL UNLOADED. BRU
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.08.19 13:04:16 -05'00'Diana Bowling (13407)
End Date & TimeEvent GasMCF Description of Incident Category Reason Actions Taken07/01/2025 04:35 PM 0.1 Excess venting due to liquids unloading at well 214-26.VENT Liquids Unloading Excess venting necessary to unload liquids.07/03/2025 12:00 PM 45.0 Excess venting due to liquids unloading at well 223-24.VENT Liquids Unloading Excess venting necessary to unload liquids.07/14/2025 11:00 PM 30.0 Excess venting due to cap string removal.VENT Scheduled MaintenanceExcess venting necessary to keep well maintained. 07/15/2025 02:00 AM 5.0 Excess venting due to liquids unloading at well 214-16.VENT Liquids Unloading Excess venting necessary to unload liquids.07/16/2025 10:45 PM 15.0 Excess venting due to liquids unloading.VENT Liquids Unloading Excess venting necessary to unload liquids.07/20/2025 09:40 AM 5.0 Excess venting due to liquids unloading at well 214-26.VENT Liquids Unloading Excess venting necessary to unload liquids.100.1Excess Flare ReportStart: 07/01/2025 End: 07/31/2025BELUGA RIVER UNITBegin Date & Time PlannedSteps Taken to Minimize Reoccurrence07/01/2025 12:00 AM N Liquids unloading.07/03/2025 09:30 AM Y Liquids unloading.07/14/2025 11:30 AM Y Scheduled maintenance.07/15/2025 12:00 AM Y Liquids unloading.Total > 1 Hour:07/16/2025 05:45 PM Y Liquids unloading.07/20/2025 07:30 AM Y Liquids unloading.
Digitally signed by Diana Bowling (13407)DN: cn=Diana Bowling (13407)Date: 2025.09.17 16:50:51 -05'00'Diana Bowling (13407)
Excess Flare Report Start: 08/01/2025 End: 08/31/2025 BELUGA RIVER UNIT Begin Date & Time End Date & Time Event Gas MCF Planned Description of Incident Category Well Name Well API Reason Were All BMP Plan Steps Taken? Steps Taken to Minimize Reoccurrence Actions Taken 08/02/2025 04:30 PM 08/03/2025 05:30 PM 15.0 Y Excess venting due to unloading well 214-26. VENT BRU 214-26L (Beluga Sterling PA) 5028320083- Liquids Unloading Y Liquids unloading. Excess venting necessary to complete procedure. 08/03/2025 10:00 AM 08/04/2025 01:15 PM 30.0 Y Excess venting due to unloading well 214-26. VENT BRU 214-26L (Beluga Sterling PA) 5028320083- Liquids Unloading Y Liquids unloading Excess venting necessary to complete procedure. 08/08/2025 08:45 PM 08/08/2025 10:15 PM 30.0 Y Excess venting due to unloading well 223-24 after C2 was brought back online. VENT BRU 223-24 (Beluga Sterling PA) 5028320183-00 Liquids Unloading Y Liquids unloading. Excess venting necessary to unload the well. 08/09/2025 03:45 PM 08/09/2025 05:30 PM 30.0 Y Excess venting due to liquids unloading at well 223-24.VENT BRU 223-24 (Beluga Sterling PA) 5028320183-00 Liquids Unloading Y Liquids unloading. Excess venting necessary to complete procedure. 08/13/2025 11:00 AM 08/13/2025 12:30 PM 35.0 Y Excess venting due to liquids unloading at well 223-24.VENT BRU 223-24 (Beluga Sterling PA) 5028320183-00 Liquids Unloading Y Liquids unloading. Excess venting necessary to unload liquids. 08/18/2025 06:15 AM 08/18/2025 12:15 PM 40.0 Y Excess venting due to liquids unloading at well 214-26 due to C7 shutdown. VENT BRU 214-26L (Beluga Sterling PA) 5028320083- Liquids Unloading Y Liquids unloading. Excess venting necessary to unload liquids. 08/26/2025 12:45 PM 08/26/2025 02:15 PM 30.0 Y Excess venting due to liquids unloading at well 214-26L during C7 outage. VENT BRU 214-26L (Beluga Sterling PA) 5028320083- Liquids Unloading Y Liquids unloading. Excess venting necessary to unload liquids. Total > 1 Hour: 210.0