Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout178-083.~ev!ew ~e well file, well head e Well hea~ em= ~-~: Harkmr 'post or plats STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Plugged Back for Sidetrack WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [~ Gas I--I Suspended [] Abandoned [] Service Water Injection 2. 'Name of Operat°'~ ............................................ 7. Permit Number ................ BP Exploration (Alaska)Inc. 78-83 399-105 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20341 4. Location of well at surface..~ ~ ~ 9. Unit or Lease Name 1740' SNL, 1608' WEE, SEC. 31, T11N, R14E, UM ,t~ Prudhoe Bay Unit At top of productive interval'1 10. Well Num'l~'~'i ....... 1398' NSL, 918' WEL, SEC. 36, T11N, R13E, UM B-13i At total depth ! 11. Field and Pool 1355' NSL, 1157' WEL, SEC. 36, T11N, R13E, UM ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 64.16' AMSLI ADL 028286 12. Date Spudded 113. De~'"T.D. Reached 114. Date Comp., Susp., 0r Aband.115. water'd'epth, if offshOre "1~ 6.'"'~'~i of ~'~pleti0n~ 12/7/78I 1/10/79I 6/23/99 ........I N/A MSLI ............. Zero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+~D) 19. Directional Survey 120. Depth where sssv set 121. Thickness of PermafrOSt 11032 9114 FTI 10940 9048 FT F~Yes [~NoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIL/SP/GR, BHCS/GR , , , 23. CASING~ LINER AND CEMENTING RECORD .... CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 30"x 20" Insulated Conductor Surface 110' 36" 454 cu ft Permafrost ............................................ 13-3/8" 72# ' L'80 Surface 2686' 17-1/2" 5766 cu ft Permafrost II 9-5/8" 47# ~ L-80 Surface 10366' 12-1/4" 1062 cu ft C..!ass 'G', 300 cu ft PF ,C, ............. 7-5/8" 29.7# NT-80S 3241' 9844' 8-1/2" 230 cu ft Class 'G' (Tieback) 7" 29# L-80 9844' 11032' 8-1/2" 517 cuft Class 'G' 24. Perforations open to P~'d'~'~ion (MD+'I-~D"~f Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 7" & 5-1/2" & 4-1/2" 10567' 9807' & 10538' MD TVD MD TVD 4-1/2" 108'25' - 10839' '""i"0825' ' ....... 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED , ........ 10601' Top of set Whipstock 10601' P&A with 45 Bbls Class 'G', Sqzd 500 psi .............. 27. ~ ........... PRODUcTION"TEsT ...... 0 D I ~'"'i'ltlA'"'"i' Date' FirSt Production ............ I Method '~"~peration (Flowing, gas lift';' etc.) .... I \ ! ~ '1' I ~ t~ Not on ProductionI N/A , Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ' I GAs-OIL RATIO iTEST PERIOD I Flow TUbing Casing Pressure !CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 124-HOUR RATE ~ ~ ~ 28. ,,, ' ................... CORE DATA,, ,,,,',,',',,',,,,' ......... , ......... ,~ ff ~':! ~" Brief description of"liihology, porosityi' fractures, apparent dips and presence of oil, gas or water. Submit core chips. O;i 1999 '~,¢aska OJ! & Gas Oor,,s. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests , ,, Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. BKB Subsea Sag River 10475' 8646' Shublik 10508' 8670' Ivishak 10604' 8739' , , 31. List of Attachments Summary of Daily Drilling Reports 32. I h(~';'~'~'""c'~rtify th'at the foregoing is true and correct to the"l~"est of my knowledge .................... ...................... Terrie Hubble Title Technical Assistant III ....... Date v v....,.~v~., , B-13i 78-83 399-105 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. , .............. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 To: Anchorage Producti~..;ngineering ..ocation: Prudhoe Bay From: Kirby Walker Date: June 21, 1999 Operation: B-13ai Cost Code: 4P1287 Job Id: 9335-070-xxx Detail Code: CTSDTRK/WHIPSTK / etc Set Whipstock E-Line Summary MIRU SWS. MU Baker whipstock and setting tool with weight bar oriented 30° right to offset the whipstock's natural tendency to lay about 5° left (can only set weight bars in 30° increments). RIH w/BHA #1and tie into shod joint referencing CBL (1/30/79) at 10,667'. Attempt to rotate tool to desired angle of 20- 300 left. Tool face will only move from 0 to 70 left. Talk to Ted Stagg in town and decide to POOH and add weight bar (total of 19'). MU BHA #2 and RIH. Tie into shod joint and attempt to log into position. Once again cannot get positioned within set window- can only get to 120 left. POOH to reconfigure BHA weight bars. Turn weight bars an additional 30° right- now at 600 right. RIH w/BHA #3 to 10,725'. Tie into shod joint and log into position. Fire charge and note tension decrease- setting top of whipstock at 10,601' and 230 left. Wait 3 minutes to allow to whipstock to completely set and log off. Re-tag whipstock at 10,590. POOH. RDMO SWS. Notify PCC to put well back on injection at previous rate. Estimated Daily Cost: $51,900. 06/21/99 Initial Well Status Fwhp lap 0ap GIp FIp Fit psi psi psi psi psi °F SI 0 0 80 N/A 0 133 Time Operation 08:30 MIRU SWS. 09:45 Hold [are-job safety meeting with SWS and Baker. 10:15 Call for radio silence - arm setting tool. 10:40 RIH w/BHA #1. 11:45 On bottom- begin tie in. 12:05 Tied into shod joint at 10,667'. Attempt to rotate tool- continually 0°- 7o left. 13:07 Talk to town. Agree to POOH and add more weight bar. 14:05 On surface with tools. Add weight bar and joint of lubricator. 15:45 MU and RIH w/BHA#2. 16:40 On bottom. 16:52 Tied into shod joint. Attempt to log into position. 17:25 POOH. Cannot get fudher than 12° left. 18:20 On surface. Rotate weight bars one more notch to the right. 18:45 RIH w/BHA #3- weight bars rotated 60° right. 19:50 At depth- tie into shod joint. 20:27 Log onto depth and fire charge setting top of whipstock 1' deep/10,601') at 23° left. 20:30 Log off. 20:37 Re-tag top of whipstock. 20:40 POOH 21:30 On surface with tool. Release radio silence. RDMO SWS. Operation: B-13ai Page: 2 Final Well Status Fwhp lap 0ap GIp FIp Fit psi psi psi psi psi °F SI 0 0 80 N/A 0 133 IWhipstock and setting tool Bottom Hole Assembly # 1 Tool String Descriptions O.D. Length Comments Perforating Head 3.375 1.7 POS Tool 3.375 3.5 Adapter 3.625 0.4 Adapter 3.625 2.3 Weight bars 3.375 8.3 oriented 300 right Setting tool 2.875 6.3 Whipstock 3.625 16.7 Total Length 39.2 IWhipstock and setting tool Bottom Hole Assembly # 2 Tool String Descriptions O.D. Length Comments Perforating Head 3.375 1.7 POS Tool 3.375 3.5 Adapter 3.625 0.4 Adapter 3.625 2.3 Weight bars 3.375 19.0 oriented 30° right Setting tool 2.875 6.3 Whipstock 3.625 16,7 Total Length 49.9 Whipstock and setting tool Bottom Hole Assembly # 3 Tool String Descriptions O.D. Length Comments Perforating Head 3.375 1.7 POS Tool 3.375 3.5 Adapter 3.625 0.4 Adapter 3.625 2.3 Weight bars 3.375 19.0 oriented 600 right Setting tool 2.875 6.3 Whipstock 3.625 16.7 Total Length 49.9 To: Anchorage Productic. :ngineering ,.ocation: Prudhoe Bay From: Kirby Walker Date: June 23, 1999 Operation: B-13i Cost Code: 4P1287 Job Id: 9335-070-xxx Detail Code: CTSDTRK / SQZ / etc Cement Plug Summary 6~22: (10:00am) Notify AOGCC of operation. SI injection at 17:00. 6/23: MIRU CTU. MU BHA #1 and RIH. Tag whipstock and stack about 4,000#. Adjust depth and PUH to WCTOC (9,000') and continue cooldown. RU cement crew. Begin pumping cement. Have problems with mixing and have to abort job. Reverse out a total of 5 bbl (1.9 bbl cmt) to slop tank. Have more materials brought to location and start again. Pump 30 bbl of cement (2 bbl neat - 20 bbl w/agg. - 8 bbl neat) injecting 20 and laying in 10. With 2 bbl of cement left above W/S obtain 500 psi. S/D and wait. Pressured up to 550 psi with no cement above W/S - pump away cement and RIH to wash off W/S tray while waiting for more cement. Injectivity decreased from 500 psi @ 4.0 bpm to 750m psi @ 2.3 bpm. Mix and pump 15 bbl additional cement (2 neat- 5 w/agg - 8 neat). Inject 9 bbl and lay in the remaining 6 bbl. Attempt to hesitate the last 6 bbl in one bbl increments. Able to build pressure to 500 psi but bled off slowly. Left 3 bbl above top of tray. Bled off wellhead and dropped ball. Seated ball and jetted to 10,450'. POOH jetting. Freeze protect to 2,000' with methanol. Estimated Daily Cost: $43,000 06/23/99 Initial Well Status Fwhp lap 0ap GIp Inj Line Fit psi psi psi psi psi °F Dead 0 0 0 N/A 1200 60 Time Operation 10:00 MIRU Dowell #2, 14,575' of 1-3/4" (ctv 33.2 bbls). 11:15 Hold pre-job safety meeting. Ty George is spill champion. 11:30 Start in hole with BHA #1. 13:00 Tag whipstock- continue cooldown. 14:10 Hold safety meeting with cement crew. 14:21 Start cement. 14:28 Abort cement job. Order more chemicals. Problem with bladder that controls dry cement flow. 15:30 Start cement on 1st plug. 18:42 Start cement on 2® plug. 20:24 Bleed off WHP and POOH jetting. 21:37 Start pumping methanol. 22:35 On'surface with coil. RDMO Dowell. Time Depth Rate Ctp Whp Total Remarks ft bpm psi psi bbls 11:30 0 3.3 2571 0 0 Start in hole with BHA #1. 12:11 5025 3.0 2633 550 135 Weightcheck-lO,O00#. 12:58 10500 0 475 500 268 Weight check -18,500#. 13:01 10601 0 300 347 Tag Whipstock and stack -4,000# - adjust depth (-7') 13:03 10601 3.0 2267 405 268 Continue cooldown and PUH to 9,000' (WCTOC) 14:13 9016 0 525 515 436 Pressure test cement lines. Operation: B-13i Page: 2 14:19 9200 1.7 1134 180 437 Start fresh water ahead. 14:21 9235 1.7 1718 243 Start cement. 14:23 9324 0 10 0 2 Powder up tub, 14:32 9971 5.0 0 350 2 Reverse cement from coil with KCI. Order more chemicals. 15:28 9972 2.3 1385 0 5 Pressure test cement lines- Start fresh water ahead. 15:31 9972 1,7 484 0 2 Start cement. 15:33 10010 1.6 1949 0 2 Start aggregate. Pump down annulus to obtain positive pressure. 15:50 10550 1.5 2907 284 22 Finish aggregate. Continue with neat cement. 15:56 10590 1.5 2901 306 30.3 Start fresh water behind. 15:58 10590 1.5 3510 330 3 Cement at nozzle. 16:20 9975 1.0 988 197 33 Cement out of nozzle. Pull to safe depth. 16:23 9700 1.0 963 205 36 Park coil. Close choke apply squeeze pressure FIRST SQUEEZE 16:45 9694 0.5 610 402 42 Attempt to squeeze. 16:48 9697 0 550 500 43 S/D and wait. 16:58 9700 0.7 500 490 43 Attempt to get squeeze. 17:00 9700 0 1688 635 44 Did not get squeeze. Pump away cement. 17:32 10601 1.3 1703 741 84 Tag whipstock and thoroughly wash tray. 18:33 9962 0 815 758 162 S/D. PT cement lines. 18:34 9955 1.5 1590 764 Start freshwater. PT cement lines. 18:42 9933 1.7 1758 767 2 Start cement. 18:53 10193 1.6 3663 785 16.3 Start freshwater behind, 19:04 10590 1.7 2977 786 17 Cement at nozzle. SECONB SQEEZE 19:20 9900 0 600 511 37 S/D pump and leave 500 psi on WH. 19:30 9900 0.5 512 483 37 Attempt to squeeze. 19:32 9900 0 525 630 38 S/D- hesitate 19:52 9900 0.5 769 475 38 Attempt to squeeze. 19:53 9900 0 445 545 39 $/D hesitate. 20:15 9900 0.5 700 420 39 Last attempt. 20:16 9900 0 693 500 40 S/D. Pressure fell off 30 psi immediately after S/D. 20:24 9900 0 425 400 40 Final pressure before jetting. 20:24 9900 3.0 2705 80 40 Bleed off WHP and begin pumping. Drop ball and RIH to 10,450' 20:37 10450 3.0 2677 70 72 Ball on seat. POOH jetting. 21:37 3450 2.1 1430 5 122 Switch to methanol for freeze protect. 21:53 2000 2.1 3807 23 33 Methanol at nozzle. POOH laying in methanol. 22:05 1246 2.0 3640 20 80 Switch to water. 22:35 0 0 18 10 33 On surface with coil. RDMO Dowell. First Squeeze: Time Depth Rate Ctp Whp Stage Out Rtn Remarks ft bpm psi psi bbls Nzl bbls 15:58 10590 1.7 3330 325 34 1 15:59 10590 1.7 3214 320 35 2 16:00 10590 1.7 3089 316 36 3 16:00 10590 1.7 2952 310 37 4 16:01 10590 1.7 2867 315 38 5 Operation: B-13i Page: 3 16:01 10590 1.7 2759 322 39 6 16:01 10590 1.7 2715 330 40 7 16:02 10590 1.7 2710 341 41 8 16:02 10590 1.7 2728 353 42 9 Pedorations am covered. 16:03 10590 1,7 2726 361 43 10 16:04 10590 1.7 2724 373 44 11 16:05 10590 1.7 2726 386 45 12 16:05 10590 1.7 2722 390 46 13 16:06 10590 1.7 2738 405 47 14 16:06 10590 1.7 2734 411 48 15 16:07 10590 1.7 2726 437 49 16 16:07 10590 1.0 2694 450 50 17 16:08 10590 1.0 2690 455 51 18 16:08 10590 1.0 2675 471 52 19 16:09 10590 1.0 1820 480 53 20 Open choke and begintola¥in cement 16:09 10590 1.0 611 395 54 21 1 16:10 10590 1.0 578 235 55 22 2 16:10 10524 1.0 537 195 56 23 3 16:11 10459 1.0 640 190 57 24 4 16:11 10393 1.0 645 197 58 25 5 16:13 10327 0.7 712 185 59 26 6 16:15 10262 0.6 794 197 60 27 7 16:17 10196 0.7 882 200 61 28 8 16:18 10130 0.7 934 200 62 29 9 16:19 10065 0.7 979 194 63 30 10 Pulltosafedepth. Second Time Depth Rate Ctp Whp Stage Out Rtn Remarks ff bpm psi psi bbls Nzl bbls 19:04 10590 1.7 2954 770 34 1 19:05 10590 1.7 2895 757 35 2 aggregate outofnozzle 19:05 10590 1.7 2825 748 36 3 19:06 10590 1.7 2756 746 37 4 19:06 10590 1.7 2707 748 38 5 19:07 10590 1.7 2665 758 39 6 19:07 10590 1.7 2606 761 40 7 19:08 10590 1.7 2529 770 41 8 19:08 10590 1.7 2350 773 42 9 peds covered 19:09 10590 1.7 945 722 43 10 19:10 10590 1.0 875 540 44 11 1 Openchoke-takereturns. 19:11 10590 1.0 893 520 45 12 2 19:12 10524 1.0 1029 493 46 13 3 19:13 10459 1.0 1077 492 47 14 4 19:15 10393 0.5 1099 500 48 15 5 19:16 10327 1.0 1049 496 49 16 6 Pulltosafedepth. Operation: B-13i Page: 4 Final Well Status Fwhp lap 0ap GIp FIp Fit psi psi psi psi psi °F Dead 20 0 0 N/A 1100 52 Fluid Summary 754 Freshwater w/2% KCI & friction reducer. 46 Cement 8 Fresh water 80 MeOH 888 Total Cement Nozzle Bottom Hole Assembly # 1 Tool String Descriptions O.D. I.D. Len~lth Comments DS ct connector. 2.0 1.0 0.125 DS X-O 2.0 1.0 0.375 Stinger 2.0 1.0 5.75 Joust cement nozzle (tapered 3.0" - 2.25") 3.0 1.17 multiple around swirl- 7/8" ball Total Length 7.42 Dowell Cement Summary 15.8 PPG Class G Cement containing: 0.02 gps D047 0.350 % BWOC D156 0.20 %BWOC D065 0.23 % BWOC D800 Thickening Time = 4 hrs and 45 mins. Lab APl fluid Loss = 106 mi @ 170 Deg. F. Requested 90-110 mi., 100 cc target Requested 3-5 hours PRUDHOE BaY, ALASKA TO: PE REPORT GROUP FROM: YEAGER PAOLINO WELL NAME: IB-13 MAIN CATEGORY IcTSDTK SUB CATEGORY IPRESSURE TEST I OPERATION DATE 16/24/99 DATE: 16/25/99 I OPERATION: PRESSURE TEST CEMENT PLUG IN TUBING IN PREP FOR CTU SIDETRACK INITIAL PRESSURE: SIWHP = 50 PSIG, IAP = VAC, OAP = 0 PSIG. 2000 HRS: MIRU HB&R, SAFETY MEETING, PRESSURE TEST HARDLINE TO 3000 PSI. Time WHP lAP OAP Fluid BPM Total Fluid COMMENTS Type BBIs Temp 2014 50 VAC 0 DSL 1 0 AMB START PUMPING DOWN TUBING 2016 1500 VAC 0 DSL .5 2 AMB SHUT DOWN AND MONITOR 2046 1460 VAC 0 GOOD TEST, BLEED BACK TO ZERO 2050 0 VAC 0 RIG DOWN HB&R Final Pressures: SIWHP = 0 PSIG, IAP = VAC, OAP = 0 PSIG. Fluid Summary: PUMPED 2 BBLS DIESEL CONCLUSION: B-13 CEMENT SQUEEZE PASSED PRESSURE TEST. OVER 30 MINUTE TEST TUBING PRESSURE LOST 40 PSI. STATE OF ALASKA ALASKA ~)IL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1740' SNL, 1608' WEL, SEC. 31, T11 N, R14E, UM At top of productive interval 1398' NSL, 918' WEL, SEC. 36, T11 N, R13E, UM At effective depth 1364' NSL, 1097' WEL, SEC. 36, T11N, R13E, UM At total depth 1355' NSL, 1157' WEL, SEC. 36, T11N, R13E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [~ Service 12. Present well condition summary 6. Datum Elevation (DF or KB) KBE = 64.16' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-13i 9. Permit Number 78-83 10. APl Number 50-029-20341 1. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Tieback Liner 11032 feet 9114 feet 10940 feet 9048 feet Length Size 110' 20"x 30" 2686' 13-3/8" 10366' 9-5/8" 1188' 7" 6603' 7-5/8" Plugs (measured) Junk (measured) 14 999 Junk from three EZ drills to 10940' Naska 0ii & Gas Cons. C0mmissi~ Cemented M D Anch°ragr~D 454 cu ft Permafrost 110' 5766 cu ft Permafrost 2686' 1062 cuft Class 'G', 365 cuft PF 'C' 10366' 110' 2686' 8633' 517 cu ft Class 'G' 230 cuft Class 'G' 9844'-11032' 8268'-9115' 3241'-9844' 3235'-8268' Perforation depth: measured 10608' - 10675'; Straddled: 10484' - 10502' true vertical 8807' - 8855'; Straddled: 8718' - 8731' Tubing (size, grade, and measured depth) 7", 26#, L-80 to 3162'; 5-1/2", 17#, NT-80S 3162' - 9787'; 4-1/2", 12.6#, L-80 9787' - 10567'; 4-1/2" from 10825' - 10839' Packers and SSSV (type and measured depth) 7" Otis 'WD' packer at 10825'; 7" TIW HB-BP packer at 10538'; 7-5/8" TIW HBBP-R retrievable packer at 9807'; 7" Otis 'RPB' BVN at 2112' 13. Attachments [~ Description summary of proposal E~ Detailed operations program r-] BOP sketch 4. Estimated date for commencing operation June 19, 1999 16. If proposal was verbally approved Name of a..p. prover Contact Engineer Name/Number: Ted Stagg, 564-4694 Date app.r0¥e.d 15. Status of well classifications as: r-~ Oil [-I Gas [-I Suspended Service Water Injection Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that ~t~e foregoing is true and correct to the best of my knowledge Signed ~,~~--~ Ted Stagg Title CT Drilling Engineer _ ..,,,1 Commission Use Only Date Conditj~,~:)~'/~.pproval: Notify Commissiop so representative may witness ,.,n~)~°~'~,~ ~' Plug integrity ,,"" BOP Test ,-'""- Location clearance ' ~3,~~ Mechanical Integrity Test Subsequent form required 10-~¢) ~ ~ \ ' ORIGINAL SIGNED. BY A~)proved by order of the Commission Robert N Chdstens0n Commissioner Form 10-403 Rev. 06/15/88 ,, eared rvices rilling Date: June 14,1999 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Petroleum Engineer Re~ Well B-13ai Prep for CT Sidetrack Well B-13 is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare B-13 for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of this proposed completion is attached. 1. A Mechanical Integrity Test was successfully performed with AOGCC witness on 4/27/99. 2. A Schmoo-B-Gone treatment was performed on 4/30/99. 3. A Kinley caliper was run on 5/1/99. 4. A whipstock drift run was done on 5/6/99. 5. E-Line will be used to set a mechanical whipstock in the 7" liner at approx. 10,600'. 6. Service coil will be used to pump approx 25 bbls cement to abandon the existing Ivishak perfs. 7. Abandonment cement will be pressure tested to 2200 psi with AOGCC witness prior to milling the window with drilling coil. 8. The 2 7/8" sidetrack liner will be cemented to at least 200 ft above the window to provide additional isolation. Steps 5 & 6, setting the whipstock and squeezing cement are scheduled for June 19, 1999. Step 7 is scheduled to be performed by the drilling coil on June 25, 1999, pending approval of the Permit to Drill. These dates are based on our estimate for completion of summer rig maintenance currently in progress. Ted Stagg CT Drilling Engineer cc: Well File TREE: 7-1/16" 5M CIW B-13ai Proposed Completion KB. ELEV = 64.16' BF. ELEV: 37.72' WELLHEAD: 13-5/8" 5M McEvoy Conv. ACTUATOR: OTIS FOC I13'3/8'' 72# L'8° 2686' BUTT, CSG. 7" OTIS LANDING NIPPLE W/INSERT, ID: 3.813" W/O,INSERT, ID= 5.962" I2112' I3241' I 7-5/8"TIW LINER HANGER 7-5/8" 29.7# NT-80S FL4S TIEBACK Crossover, 7" IJ4S X 5-1/2" NSCC I3161' KOP: 2800 MAX ANGLE: 48° @ 6900' 5.5" 17# NT-80S NSCC TUBING, ID: 4.892" CAP=0.02324. BBLS/FT TAILPIPE 4.5" 12#/FT, TDS TUBING, ID= 3.958" CAP= 0.01521 .BBLS/FT 7II RECEPTACLE I10366' I 9-5/8" 47# L-80 BUTT,CSG. 2 7/8" cemented liner PERFORATION SUMMARY REF LOG: SWS- BHCS- 1-10-79 INTERVAL 10484'-10502' 10608'-10675' 10675'-10685' 10685'-10704' 10714'-10734' 10744'-10822' 10844'-10876' 10876'-10896' ~PEN/SQZ'D STRDLD/8-2-87 OPEN/11-11-84 OPEN/8-2-87 OPEN/7-14-89 ii ii ii ii OPEN/8-2-87 ii ii IWhipstock ~'/' IAbandonment Cement Crossover, 5-1/2" NSCCX 4-1/2" TDS J 9785' 4.5" PARKER-SWS-NIPPLE I ID= 3.813" I 9798' 5/8" TIW(HBBR-R ) I RETR. PACKER I 9807' ID= 3.890" Caution: the TIW packers in this well may fail if more than 2100 psi differential pressure is exceeded. TIW (HBBP) Packer ID= 4.00" 4.5" PARKER-SWS-NIPPLE ID= 3.813" 4.5" PARKER-SWS-NIPPLE ID= 3.813" WLEG ELMD 10538' I 10548' 10559' W/1/2 ORIFICE 10825' 10838' 10839' 10948' I PBTD I I 7'' ' 29#/ft' L'8°' 11032' BUTT, CSG. NOTE: JUNK FROM 3 E-Z DRILLS LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE .ANCHORAGE AK, 99501. Date: 14 December 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL N-24 (22-17-11-13) DESCRIPTION 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF Run ~ 1 Run # 1 Run # 1 ECC No. 522 12 5008.05 5734.05 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street ~C~/ Suite 201 7%~_ ~/~D Anchorage, AK 99518 .. .-~ Or FAX to 907 563 a/~C 7~ Received b~/~ _~----~( ) -78034~ .... ~/ / ' ~ ~ . - ~Chor~g;' ~b~i~etor' LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 22 March 1995 Transmittal of Data ECC #: 5008.04 Sent by: MAIL Data: PLS Dear ~ir/Madam, Reference: PRUDHOE BAY NORTH SLOPE, AK · Enclosed, please find the data as described below: Prints/Films: 1 PLS FINAL-BL+RF Run # 1 Received by: Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 hA Anchorage, AK 99518 O FAX 907) ~563-7803 Flease s i~n and return Petrctechnica! Data Center BP E~iora'~icn (Alaska ~ Inc 900 Last Dead. son Date MAR 30 995 Alaska 0il & Gas Cons. Commission Anchora§8 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 22 March 1995 Transmittal of Data ECC #: 5008.04 Sent by: MAIL Data: PLS Dear Sir/Madam, Reference: PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 PLS FINAL BL+RF Rhn # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 O FAX 907) ,563-7803 Received by:. ~~~' ~~ Date: ~'Lease ~ .... and retur!~ to: Petrctechnical Data BP E:.:pic. ra-t!cn (.Aiask-~:! 900 ?' ....... S:~'.~': ~ .... ~::.""~': MAR 30 1995 Alaska Oil & 6as Cons. Commission ~ct~orage --' STATE OF ALASKA .... ALAS blLANDGAS CONSERVATION COMMISSI( 0 It I G IN A L REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging ... Pull tubing x Alter casing x Repair well X 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development .... Exploratory Stratigraphic Service X Perforate Other .. 6. Datum elevation (DF or KB) KBE -- 64.16 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 1740' SNL, 1608' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 1398' NSL, 918' WEL, SEC. 36, T11N, R13E, UPM At effective depth 1366' NSL, 821' WEL, SEC. 36, T11N, R13E, UPM At total depth 1355' NSL, 883' WEL, SEC. 36, T11N, R13E, UPM 8. Well number B-13i (43-36-11-13) 9. Permit number/approval number q~'"' C~CJ/ Conservation order 258~ 10. APl number 50- 029-20341 11. Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate Production Liner 6603' Perforation depth: measured 11032 feet BKB 9114 feet 10940 feet BKB 9048' feet Plugs (measured) Junk (measured) Junk from three EZ drills to 10940'MD Size Cemented Measured depth True vertical depth 7-5/8" 230 cu fl C/ass "G" 3241 '-9844' 24 70'-8260' true vertical Tubing (size, grade, and measured depth) 7", 26#, L-80, Surface -3162', 5-1/2", 17#, NT-80S, 3162'-9787', 4-1/2", 12.6#, L-80 9787'-10567' Packers and SSSV (type and measured depth) 7" Otis 'WD' Packer @ 10825; 7" TIW HB-BP Packer @ 10538', 7-5/8" TIW HBBP-R retrievable packer @ 9807', 7" Otis 'RPB' BVN @ 2112' 13. Stimulation or cement squeeze summary 14. RECEIVED Intervals treated (measured) Treatment description including volumes used and final pressure MAY - ,5 199 a ~ ~,3 o,~ ~vIla~j~'~-- - Representative Daily AVerage Production or Injection Da ~k~ ~. & ~v,,~. Oii-Bbl Gas-Mcf Water-Bbl Casing Pressure ~~ssure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations x 16. Status of well classification as: Oil Gas Suspended Service Water Injector . ._ 17. I hereby certify that the foregoing is true and correct to..t.h_e._best of my knowledge. Signed ~~,~ ' ~~TitleWorkoverEn~TineerSupervisor Form 10-404 Rev 06/15/88 Date SUBMIT IN DU'PLI~ATE ACTIVITY SUMMARY for WELl tOJECT 145067 COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK FIELD : PRUDHOE BAY WELL : B-13I Page: 1 DRLG RIG : NONE WO/COMP RIG: DOYON 16 (COMP) NU ND: 12.5 PL TBG: 5.5 06/13/91 ( 1) PUMP SALT PILL MW: 0.0 TD:l1032 MOVE RIG FROM R-PAD TO B-PAD, R/U TREE PUMP SALT PILL, PB:10948 INSTALL 6-3/8" TWC, N/D TREE, N/U BOPE, TEST BOPE,PULL OUT SUPV:SCALES OF 7" PBR, PULL TBG HGR TO FLOOR, HOLE TAKING 90 BPH, PUMP SALT PILL. (145067) DAILY: $ 73,640 CUM: $ 73,640 EFC: $ 979,000 06/14/91 ( 2) TD:l1032 PB:10948 SUPV:SCALES RIH W/ MILLING ASSEMB. (145067) DAILY: $ 36,429 CUM: $ MW: 0.0 110,069 EFC: $ 979,000 (COMP) PL PKR: 12.0 PL TBG: 12.0 06/15/91 ( 3) RIH W/ MILLING ASSEMB. MW: 0.0 TD:l1032 PUMP SALT SIZED PILL, REDUCED FLUID LOSS TO 22BPH, POH LD PB:10948 TBG, INSTALL WEAR RING, PU MILLING ASSEMB, RIH, MU KELLY, SUPV:SCALES SERVICE RIG, PU 3-1/2" DP, RIH W/ MILLING ASSEMB (145067) DAILY: $ 1 CUM: $ 110,070 EFC: $ 979,000 (COMP) CLN OUT: 2.0 06/16/91 (-- 4) TD:l1032 PB:10948 SUPV:SCALES PL PKR: 22.0 RIH W/ BOOT BASKETS MW: 0.0 RIH W. MILLING ASSEMB, TAG UP ON TOP OF PKR @ 10825', MILL ON PKR, BRK FREE PUSH TO 10861', CBU, CIRC OUT GAS, POH W/MILL, RIH W. SPEAR, TAG FISH @ 10861, CHASE TO BTM @ 10925', SPEAR INTO FISH, CBU, POH LD FISH, MU 6" BIT RIH W/BOOT BASKETS (145067) DAILY: $ 26,458 CUM: $ 136,528 EFC: $ 979,000 (COMP) CLN OUT: 7.5 06/17/91 (-- 5) TD:l1032 PB:10948 SUPV:SCALES TEST CSG: 16.5 POH TO RUN TST PKR MW: 0.0 RIH W/6"BIT, KELLY UP, WAH & REAM FROM 10925'-10948', REV CIRC, POH SLM, MU 7" BAKER BRIDGE PLUG, RIH, SET @ 9924', ATTEMPT TO TEST CSG, POH LD RUNNING TOOL, MU BIT & SCRAPER, RIH TO LINER TOP, REV CIRC, POH TO RUN TEST PKR (145067) DAILY: $ 113,355 CUM: $ 249,883 EFC: $ 979,000 (COMP) LOG PERF: 17.5 RUN CSG: 6.5 06/18/91 (-- 6) RIH W/~-5/8" CSG MW: 0.0 TD:l1032 RIH W/TEST PKR, LOCATE LEAK IN 9-5/8" CSG @ 3418'-3450',POH PB:10948 W/TEST PKR, RU ATLAS WL, RIH W/ GR&JB TO 9829', POH, RIH W/ SUPV:SCALES TEMP LOG, MAKE ONE PASs' POH, RIH W/ VERTILOG, POH RD ATLAS, CHANGE RAMS, RU CSG CREW, RIH W/ 7-5/8" CSG (145067) DAILY: $ 244,072 CUM: $ 493,955 EFC: $ 979,000 (COMP) RUN CSG: 24.0 06/19/91 (-- 7) TD:l1032 PB:10948 SUPV:SCALES CIRC HOLE CLEAN MW: 0.0 RUN 7-5/8" SCAB'LINER, CIRC, RUN LINER ON DP, LOCATE IN TIE-BACK RECEPTACLE, PUMP 250 SX CL 'G', POH, LD LINER TOOLS PU DC, PU & SET STORM PKR @ 90', ND BOPE, CHG OUT TBG SPOOL, TEST BOPE, SET WEAR RING, PULL STORM PKR, RIH, TAG SOFT CMT @ 3040 (APPROX 200' CMT), WASH TO LINER TOP, CIRC HOLE CLEAN. (145067) DAILY: $ 66,020 CUM: $ 559,975 EFC: $ 979,000 RECEIVED MAY - 5 1992 Alaska Oil & Gas Cons. GommiSS~on Anchorage 'ACTIVITY SUMMARY for WELL 3ROJECT 145067 COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK FIELD : PRUDHOE BAY WELL : B-13I Page: 2 DRLG RIG : NONE WO/COMP RIG: DOYON 16 06/20/91 (8) TD:l1032 PB:10948 SUPV:SCALES (COMP) RUN CSG: 24.0 TEST LINER LAP, POH MW: 0.0 CIRC HOLE CLEAN, POH W/8-1/2" BIT,RIH W/ BIT & DC, TAG CMT @ 9674', DRILL FIRM CMT TO LANDING COLLAR @ 9808', DRILL TO TIE-BACK @ 9847'. CIRC, POH, RIH TO LINER TOP W/SCRAPER, CBU, POH, RIH W/ 6-3/4" BIT & 7-5/8" SCRAPER, CIRC, TEST LINER LAP, POH. (145067) DAILY: $ 25,741 CUM: $ 585,716 EFC: $ 979,000 (COMP) RUN COMP: 9.0 06/21/91 ( 9) TD:l1032 PB:10948 SUPV:SCALES RUN PKR: 15.0 POH LD DP MW: 0.0 POH LD DP, ND RISER, NU SHOOTING FLANGE, RU ATLAS WL, RUN GR & JB TO PBTD, RIH & SET OTIS 7" WD PKR @ 10825', RD ATLAS ND SHOOTING FLANGE, NU RISER & FLOWLINE, SLIP & CUT DRLG LINE, PULL WEAR RING & RU TO RUN TBG, RIH W/COMP STRING. (145067) DAILY: $ 41,553 CUM: $ 627,269 EFC: $ 979,000 (COMP) NU ND: 10.5 RUN COMP: 7.5 06/22/91 (10) RELEASE RIG @ 24:00 MW: 0.0 TD:l1032 RUN TBG PER PROGRAM, ND BOPE, NU TREE, SECURE ELL, RU OTIS PB:10948 & SET 4-1/2" XX PLUG BELOW 7" PKR, RD OTIS, PRESSURE TEST SUPV:SCALES TBG, TEST ANNULUS TO 2500 PSI FOR 30 MIN, RELEASE RIG @ 24:00 6/22/91 (145067) DAILY: $ 221,139 CUM: $ 848,408 EFC: $ 979,000 N AY - ,5 19 Alaska 0il & Gas cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/20/92 T~ 83191 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. / S'~ ~7''1# PITS --t0 ~' ' ~2 ~ INa LEAK DET PROD-F GAS ENTRY LOG 5 " 12/31/91 #1 01/02/92 91 01/04/92 #1 01/01/92 91 01/01/92 #1 01/07/92 #1 01/01/92 #1 8970.00- 9500.00 CAMCO 5 " 9300.00- 9850.00 CAMCO 5 " 9410.00- 9914.00 CAMCO 5 " 11700.00-12600.00 CAMCO 2/5" 8450.00- 9850.00 CAMCO 5 " 10580.00-10835.00 CAMCO 5 " 10200.00-10520.00 CAMCO 5 " 12/31/91 9700.00-10065.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED JAN 2 9 ;992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 f / BP CASED HOLE FINALS DATE: 01/03/92 T# 83152 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. GAS LIFT SURVEY 12/08/91 #1 2000.00-11539.00 CAMCO INJ PITS 12/07/91 #1 PROD-F 12/07/91 #1 12/09/91 #1 INJ 12/04/91 #1 CCL 12/08/91 #1 INJ 12/06/91 #1 Y-34J~ GAS LIFT SURVEY 12/07/91 #1 TEMP 12/08/91 #1 ~l-~,x-18vf, PROD-F 11108191 #1 ~-Z6Z-32%///'J TEMP 11/05/91 #1 ~e-t~ P-15'~/,~ PROD-F 11/09/91 #1 ~r-~ N-213< CL 11/06/91 #1 ~1~" S-03~J TEMP 12/06/91 #1 qe-~ W-16J /~. PROD-F 11/21/91 #1 q~Y-15Y-31~~/ / GAS LIFT SURVEY 11/24/91 #1 ~) J~/ GAS LIFT SURVEY 11/24/91 #1 ,lq.)6D-08__._¥"'" GAS ENTRY 5 " ~'t0%-20~/~ GAS ENTRY 9450.00- 9710.00 CAMCO 9150.00- 9520.00 CAMCO 10586.00-10935.00 CAMCO 9800.00-10080.00 CAMCO 8758.00-10259.00 CAMCO 9350.00- 9850.00 CAMCO 100.00- 9130.00 CAMCO 10500.00-10867.00 CAMCO 12850.00-13445.00 CAMCO 10000.00-11010.00 CAMCO 9900.00-11038.00 CAMCO 12000.00-12337.00 CAMCO 9750.00-11270.00 CAMCO 11095.00-12076.00 CAMCO 5300.00-11200.00 CAMCO 0.00- 2840.00 CAMCO 0.00- 9860.00 CAMCO 12/08/91 #1 12/05/91 #1 12/05/91 #1 Information Control Well Records Adrian J. Martin 2/5" 5 " 5 " 5 " 5 " 5 " 5 " 2 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 2/5" 11 9950.00-10240.00 CAMCO 11100.00-11450.00 CAMCO 9850.00-10200.00 CAMCO RECEIVED JAN 0 8 1992 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTR lB UTION Date :07/10/91 T#:82574 FROM' Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-~.~.'!.5. B-13 ~--/' 2-.~-26 M-25 M-25 R-11 &Y-32 Per/ 06/11/91 #1 9780-9960 Sch 5" GR , 06/28191 #1 9900-10560 Sch 5" Perf 06/10/91 #1 10700-10270 Sch 5" G R/Jewelry 06/12/91 #1 10200-11381 Sch 5" P rod/Temp 06/13/91 #1 9920-10597 Sch 5" Prod/Static Runs 06/13/91 #1 9920-10597 Sch 5" Production Log 06/05/91 #1 12200-12760 Sch 5" Prod Log/FM 06/15/91 #i. 12200-12760 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION .~ Date:06/28/91 , T#:82546 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-18 B-13 B-13 B-13 G-15 U-13 X-04 TDT-P (Borax) 06/23/91 #1 9700-10283 Sch 5" CL 06/21/91 #1 10600-10865 Sch 5" DTL 06/17/91 #1 9900-9920 Sch 5" Vertilog 06/17/91 #1 0-9800 Sch 5" CL 06/21/91 #1 8730-10178 Sch 5" CL 06/18/91 #1 10050-10734 Sch 5" PLS 06/23/91 #1 10357-10800 Sch 5" Production/PITS 06/22/91 #1 9350-10022 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED J~l. 8 1991 Commission BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date:06/23/91 T#:82533 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINAL,~ Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. B-13 CCL 06/17/91 # 1 9450-9819 Atlas 5" B-27 CL 06/20/91 #1 10250-10860 Atlas 5" H-16 CL 06/16/91 #1 9806-10012 Atlas 5" X-13 PLS 06/20/91 #1 9820-10280 Atlas 5" X-18 PLS 06/18/91 #1 11169-11171 Atlas 5" X-25 PLS 06/19/91 #1 10300-10775 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES TO: THRU: MEMORANoUM State of Alaska ALASYJ~ OIL AND GAS CONSERVATION COMMISSION · Lonnie C. Smi DATE: June 2 7 Commissioner / FILE NO: HH627 TELEPHONE NO: SUBJECT: Casing Pressure Test BPX PBU Pad B-13 Inj Prudhoe Oil Pool FROM: Harold R. Hawkins PetrOleum Inspector ~hursdav~_.June 20_.J 199_!: I went to BPX PBU Pad B-13 injector to witness the 7 5/8 liner put inside 9 5/8 casing that had holes in it. The 7 5/8 liner was run in from the top at 3241' down to 9924 at the bridge plug. I witnessed the pressure test of 3000 psig for 30 minutes with only 100 psig loss. Donna Parker was the engineer for BPX and Jerry Lorenzen, the company man. This was performed from 12:00 midnight to 3'45 a.m. In summary: The 7 5/8 patch was satisfactorily tested on BPX PBU Pad B-13. 02-00lA (Rev. 6/89) 20/11LMEMO1.PM3 BP EXPLORATION o ~°0 TO' DIS~~~3~ DateT~:8241:05/20/911 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. B-13 Leak Det 04/14/91 #1 50-10800 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION May 16, 1991 AEC 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Lonnie Smith A. BP Exploration (Alaska) Inc. ~ 900 East Benson Boulevard P.O. BOX 196612 An chorage, Alaska 99519-661;~S-~--~'~ G (907) 561-5111 ' ~ ~ Well B-13 (44-36-11-13} PBU Dear Mr. Smith: As agreed in a recent telephone conversation with you, we are sending the information you requested on the status of B-13. A recent MIT test in the B-13 injector failed. To determine the cause of the failure a Leak Detection survey was conducted on 5/13/91 and it showed no spinner counts in the tubing nor liner while injecting into the IA. Despite IWHP of 1400 psi. during the well's injection phases the lAP is only 400 psi., which is a good indication that there is no tubing-annulus communication and that all injected water is going into the open perforations. A radioactive tracer was injected into the annulus on 5/14/91 to detect possible leaks in the 9-5/8" casing. Leaks were identified in the 3445-3480' and 3830-3870' sections indicating annulus-formation communication. A variance is being requested to allow injection until a rig workover can be performed. The workover is top priority and is scheduled to start within two weeks as soon as a rig becomes available. The scope of the work to be performed on B-13 is outlined below. The well is currently shut-in. B-13 Rig Workover . 2. 3. 4. 5. 6. Pull tubing. Mill WD. Set 9-5/8" to 7-5/8" liner hanger Run new 5-1/2" tubing. Run casing patch over SAG interval to isolate a thief zone. Recomplete the well. Your prompt consideration of our request will be greatly appreciated. Yo~urs very tr...uly, .z::A.o L.S. Mc.,Keague Waterflood/MI Petroleum Eng. Supervisor RECEIVED MAY Alaska 0il & Gas Cons. Commission Anchorage INJECTION' WELL ANNULUS STATUS WELL INJ MIT P NAME SERV DATE F COMMENTS A-03 PW 4/25/91 P No problem; currently stable on MI @250 lAP A-08 PW 4/25/91 P lAP looks thermal; WHT varies 30°F-IA/OA expands from 0 to 800 psi over time A-11 MI 4/27/91 P Wellhead TI~ & Cs~ Primary seal leak. OK on PW. LKs on MI. A-16 PW 4/15/90 P RWO 4/15/90; OA pressures up over time; requires monitoring A-17 PW 4/25/91 P Slow IA leak on SW and MI, not PW. Continue to monitor. A-27 MI 4/16/88 P 4/4/88 RWO B-09 SW 5/13/88 P B-13 PW 4/27/91 F ACTIVE INVESTIGATION UNDER WAY AFTER FAILURE CC-2A CRET 4/3/90 P unwitnessed MIT also 11/4/90 (passed) F-18 SW 10/13/90 P TBG/IA COMM 0.2 BPM @ 2000~ DIFF. ID'lng location is underway. F-19 SW 10/13/90 P GC-ID CRET 2/23/91 P Leak rate while on inj ~ 12 gpd @ 2000 psi diff. Req RWO letter 3/15/89. GC-1E CRET 9/21/89 P GC-2A SI 2/10/87 P RWO scheduled for lack of injectivity GC-2C CRET 12/29/88 P GC-3C PlA P/A - P8~, 1/11/91 GC-3D CRET 4/27/91 P H-03A CRET 11/3/88 P OPERATES IN SUMMER MONTHS ONLY. CURRENTLY SI AND FREEZE PROTECTED H-09 PW 10/12/90 P H-10 PW 10/12/90 P M-01 SI 11119/86 P Suspended well. M-03 SW 4/25/91 P RWO 1/9/91; P-test IA durir~l completion M-12 SW 10/2/88 P RWO 10/2/88; P-test IA 2500 duri~ rwo M-13 MI 2/22/90 P RWO 2/22/90; P-test IA during completion M-14 SW 4/25/91 P After initial blesding for 1st MI cycle; lAP stable @150 Psi for MI and good for SWl M-28 SW 4/25/91 P lAP rose to 1200 psi during last MI cycle; however looks thermal M-29 SW 2/2/89 P 2/2/89 RWO N-08 MI 4/25/91 P lAP-480 to 9(X)psi on MI cycle(but WHT goes fr/68 to 140°F too) N-23 SW 7/24/90 P RWO 7/24/90; Just finished last MI cycle; 0/240 during cycle and 0/0 after R-02 PW 10/12/90 P Bled IA to 220; stabilized @ 700 psi. Pulled wellhead Aug/90 R-03 PW 10/12/90 P Max lAP during last MI cycle was 440-1AP/0-OAP R-05 PW 10/12/90 P RWO 11/89. R-06 PW 10/12/90 P RWO11189. Stable IA/OA pressures. Bled upon conversion fr/MI to PW due to thermal expansio~ R-07 MI 10/12/9O P R-20 PW 10/12/90 P Page I INJECTION WELL ANNULUS STATUS WELL INJ MIT P NAME SERV DATE F COMMENTS S-06 PW 4/27/91 P S-09 SI 8/13/88 P Frozen flowline and well; plugged and SI since 5/24/90 , S-11 MI 4/27/91 P Very slow communication on SW; probably due to cold shortening tubing. S-14 SW 4/27/91 P Looks like slow communication on SW; again, due to steel contraction; continue monitoring T-01 SW 10/15/88 P T-07 SW 10/15/88 P RWO1/90. No problems. U-03 SW 10/13/90 P U-04 SW 10/13/90 P U-05 SW 10/13/90 P U-09 SW 10/13/90 P U-10 SW 10/13/90 P Apears to have TBG/IA communication that requires I bleed down per month. Further investigati~ W-42 G/I W-44 G/I X-06 PW 4/25/91 P OAP mostly higher than lAP. Both bleed off to zero and require weeks to build X-11 PW 4/25/91 P OAP mostly higher than lAP. Both bleed off to zero and require weeks to build X-23 PW 8/30/87 P X-24 PW 4/25/91 P Possible slow leak between Tubing and IA; monitor; Iow priority X-26 PW 8/30/87 P Y-03 PW 10/12/90 P Anomor~s need checking out. Y-05 PW 10/12/90 P Trouble shooting in progress. Y-06 PW 10/12/90 P Slow tbg/IA comm. WHT varies considerably, lAP-tests OK. Plan to plug/test tubing Y-07 PW 10/12/90 P lAP rising. Y-11 PW 10/12/90 F IA tracks tbg-:)'~00 psi. Tubing patch did not hold. RWO scheduled mid-March 1991. Y-18 PW 10/12/90 P Z-33a G/I Page 2 BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/15/91 T#:82398 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Leak Det. 05/03/91 #1 0-10847 Camco 5" GR/CCL/JEW 05/02/91 #1 9400-10780 Camco 5" Prod-F 05/06/91 #1 9000-9404 Camco 5" Gas Entry/Prod-F 05/04/91 # 1 8250-9639 Camco 5" Pmd-F 05/06/91 #1 10475-10740 Camco 5" Prod-F/PITS 05/04/91 #1 8550-9528 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :09/10/90 T#:81645 FROM- SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. - A-18 Prod-F Jewelry 08/15/90 #1 2150-10030 Camco 5" · B-13 PITS 08/24/90 #1 10300-10839 Camco 5" . D-18 Prod-F 08/19/90 #1 10850-11250 Camco 5" · F-26 Gas Entry 08/14/90 #1 10180-10535 Camco 5" H-08 Gas Entry 08/15/90 #1 8950-9420 Camaro 5" M-21 Prod-F 08/22/90 #1 8850-9250 Camco 5" M-29 inj 08/16/90 #1 9550-10025 Camco 5" X-24 inj 08/28/90 #1 9050-9450 Carrx~ 5" Y-27 Prod- F 08/23/90 #1 13000-13250 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESER~ RECE. iVED S E P 1 7 1990 Alaska Oil & 6as Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO' DISTRIBUTION Date :08/27/90 T#:81520 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. V/B-13 TDT-P Borax 08/22/90 #1 9400-10832 Sch 5" ~/H-21 P rod- F 08/21/90 #1 9300-9887 Sch 5" ~Z-13 Packer/Gun Pos. 08/21/90 #1 12400-12635 Sch 5" VZ-13 CBT 08/21/90 #1 12058-12989 Sch 5" ~,Z-!3 CET 08/21/90 #1 12058-13008 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR RECEIVED A U G 3 0 1990 .Alaska Oil & Gas (;oils. uommissio[~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 05/08/90 T#:81145 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-03 INJ 04/17/90 #1 11550-12000 CAMCO A-17 INJ 04/17/90 # 1 9850-10530 CAMCO B-13 INJ 04/23/90 #1 ,10180-10824 CAMCO E-03 INJ 04/18/90 #1 ' ,'12350-12685 CAMCO E-12 PROD-F 04/19/90 #1 8900-9411 CAMCO M-13 INJ 04/20/90 #1 9350-10073 CAMCO Z-27 CCL/GR 04/22/90 #1 0.0-13074 CAMCO 5. 5" ('Fro, ~cF," 5" 2"/5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES E RECEIV D Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL'. PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR Date: 07-10-89 T~: 80156 ARCHIVES BP CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: B'13 INJ-F 06-26-89 #1 10400-10824 Camco 5" H-26 PROD 06-22-89 #1 9400-10000 Camco 5" R-20 INJ-F 06-21-89 #1 10850-12000 Camco 5" Received: Date: . < j// ~ig:10JJ~SS'0~..[~Lq,-~ ..... InfOrmation Control ~?i'~'?~f~%~-~ .... ~'~'~Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION HOUSTON ARCO CHEVRON EXXON TEXACO 'TO: MOBIL PHILLIPS STATE OF INDEXED BP ExDloration (Alaska) Inc. '--'-'-' 900 East 8enson Boulevarcl RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561.5111 Date: 07-11-89 T~: 80158 REFERENCE: BP FINAL DATA - PRESSURE SURVEY DATA The following material is being submi~red herewith. Please acknowledge receipt by signing a copy of this.let"ret and returning it to this office: A-3i A-10 A-10 A-10 A-14 A-24 A-34 B-13 B-24 B-29 C-19 G-30 W-17 X-03 Z-15 Z-26 Z'26 Static Gradient 07-01-89 Camco Static Gradient 06-17-89 Camco Static Gradient 06-19-8,9 Camco Static Gradient 06-24-89 Camco Static Gradient 06-17-89 Camco Static Gradient 06-25-89 Camco Static Gradient 06-18-,8'9 Camco Static Gradient 06-20-&9 Camco Static Gradient. 06-20-89 Camco Static Gradient 06-20-89 Camco Static Gradient 06-22-89' Camco Static Gradient 06-10-89 Camco Static Gradient 06-28r89 Camco Static Gradient 06-25-89 Camco Static Gradient · " 07-01-89 Camco Static Gradient 07-04-89 Camco Static Gradient 07-04/05-89 Camco Rece 1 ved Date Shirley R. McCurry ~NFORMAT~ ON CONTROL Wel I Records LR2-t Slandard Ala $1~a P~oduclion Company 900 East Bens, on Boulevard P.O. 6o~ 196612 Anchorage. Alaska 99519-6612 (907) 564-.~ I ! ! INDEXED DALLAS ARco STANDARD CHEVRON ALASKA PRODUCTION KXXON Dote: 06/03/88 TEXACO TO: TI: 78897 MOBIL PHILLIFS · STATE OF ALASKA ARCHIVES REFERENCE: ~APC FINAL DATA - PRESSURE SUKVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this let-far end returning it to this offlce: A-6 05/05/88 GO Static A-10 05/05/88 .GO " ,B-lB 05/04/88 GO " B-Z5 d5/o4/88 GO " U-2 05/20/88 GO " X-5 05/06/88' GO " X-14 05/05/88 GO " Y-24 05/11/88 GO " Race I ved Date Jennifer Dietz IN~C~q~AT ION CONTR0[ Well Records /~2-1 TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS GEOSCIENCES INDEXED STANDARD AL ASKA PRODUCTION Date: 03/17/88 Ti: 78668 REFERENCE: SAPC CASED HOLE FINAL LOGS The following materlal Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: B-28 C-21 C-29 H-7 N-8 N-15 N-18 N-19 W-40 W-40 Y-22 B-13 Miscible Gas Injection Profile 03/14/88 #1 10400-10826 CH/CNL 03/12/88 #1 10450-11341 Sch 5" 'FM/Temp 03/10/88 #1 8900-9229 Camco 5" CH/CNL 03/13/88 #1 10900-11930 Sch 5" Production Profile 03/11/88 #1 10550-10890 Camco 5" Injection Profile 03/11/88 #1 9600-9840 Camco 5" PITS 03/09/88 #1 9600-10200 Camco 5" PIT 03/12/88 #1 9700-10035 Camco 5" PIT 03/13/88 #1 9700-10115 Camco 5" CBT 03/13/88 81 9302-10564 Sch 5" TCP Gun Positioning Log 03/14/88 #1 9973-10351 Sch 5" Temp/Gas Lift Survey 03/09/88 #1 3440-10585 Camco 5" Sch 5" Rece i ved Date Gas Cons. Comm!ssion .... ~_ --m~l0 A un.~ ol ~h~. o,.9.noI 5'ondo~'d 0.1 Company ~ou~ded ,n [le-et¢,~d C)i",.o. 0- 1870 Victoria Aldridge INgOR~b~IION CONIROL We~ Records LR2-~ Stondo~d P~oclu¢ lion Compo PO Bo~ 196612 Anchoroge. Alosl. o 99.519.0612 1907~ 564-511 I I NDE XED DALLAS ARCO CHEWON STANDARD AL ASKA PRODUCTION EXXON TEXACO Oate: 01/06/88 lO: MOBIL TI: 78391 PHILLIPS . STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE'FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: CCL/Perf. 11/19/87 CCL/Perf. 11/21/87 CNL/GR 12/28/87 Spinner/TEMP/Hydro on coil tubing 1 Plug setting & Tubing Puncher Record CCL/Perf. 11/29/87 Completion Record 12/29/87 X-Y CALIPER 11/26/87 CCL/Perf. 11/19/87 Squeeze Perf. Record 12/23/87 H1 10590-10750 GO 5" #1 9500-9800 GO 5" H1 11830-12216 SCH 5" 1/21-22/87 #1 9750-10515 GO 12/30/87 #1 3450-3734 Sch H1 9600-9832 GO 5" Hi 10765-11972 Sch 5" Hi 10400-11710 GO 5" H1 9500-9900 GO 5" H1 11192-12138 SCH 5" 11 5" Rece j red Date ,, Anchorage Auml ol the Or,9;nol $'ondo,d 0,1 Co.-pony [o,~ndcd ,.', Cl¢.t'lo~,d Oh,o. ,,, 1870 Victoria Aldridge INFOR~TION CONTROL Wel I Records LR2-1 Standard Alaska Production Compan~ 900 East PO ~ 196612 Anchorage. AIosLo 99519 661~ (907~ 564-51 ~ 1 INDEXED DALLAS ARCO CHEVRON E ~x[ON TEXACO Dote: 12/30/87 10: HOBIL 1#: 78363 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASK/?,, PRODI]C TtON B-13 D-4 D-4 E-29 F-4 GC-2B G-24 G-24 G-24 H-3 H-5 K-ii N-10 R-26A REFERENCE: SAPC CASED HOLE FINAL LOGS The following material ls being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: Fullbore Spinner Packer Setting Record Tubing Puncher Perf. Squeeze Record Perf. Record Production Profile 12/09/87 #1 12/06/87 #1 12/05/87 #1 12/11/87 #1 12/15/87 #1 12/06/87 #1 Plug Setting & Tubing Puncher Record Completion Record HP~Gradient Survey Perf. Record Multi-finger Caliper GR Positioning Log CBT Perf. Record Production (Spinner/Temp) 12/06/87 #1 12/08/87 #1 12/16/87 #2 12/19/87 #1 12/11/87 #3 12/18/87 #1 12/12/87 #2 12/20/87 #1 10400-10833 Sch 5" 10555-10520 Sch 5" 9550-10040 Sch 5" 8134-10148 Sch 5" 10900-12504 Sch 5" 10050-10530 Sch 5" 12/17/87 #1 2589-2815 8787-10365 Sch 5" 0-10106 Sch 5" 9400-10370 Sch 5" 8300-10042 Sch 5" 11088-11548 Sch 5" 10450-11626 Sch 5" 10100~10500 Sch 5" 9050-9310 Sch 5" Sch 5" Date ~'~;S~L~{ Oil & Gas Cons. Commissio~ ~chorage A un;l of the or,g;nol Stondo,d ~1 Company Founded ~n Cleveland. ~,o. *n t870 Victoria Aldridge INFORMAIION CONIRO~ Well Records hR2-1 Stondord Alasko .... ~" Production Comp,. 900 ~ost PO Bo,, 196612 Anchoroge, Alosko 99519-6612 (907'~ 564-511 I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD r~,L ASFA, PRODUCTION Date: 12/10/87 T#: 78352 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge recelpt by signing a copy of thls letter and returnlng it to thls office: mm C-21 ',~ x-5 Injection Profile 11/29/87 #1 10400-10885 Camco 5" Caliper 11/28/87 #1 8200-9230 Camco 5" PIT/HPFM 11/29/87 #1 10000-10480 Camco 5" ~01~rage Rece i ved Date A un;! of !he O, ig;nol Stondord Od Co.npony Founded ,n Cle.elor~d. Oh,o. ;. 1870 Victoria Aldridge I NFORMAI ION CONTROL Wel I Records LR2-1 Standard Alasi~a /~ P~oducllon Comp~ 900 Eo~,l Be-~o- P, oulevo~d PO Bo. 19661~ Anchoroge. Alos~a 99519.6612 ~90~ 564 5 I I I INDEXED DALI.AS ARCO CHEVRON STANDARD AI.A.%r./, !'Pr')l )1 EYOiON TEXACO Da+e: 09/18/87 lO: MOBIL l#: 78180 PHILLIPS 4 STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-3 B-7 B-13 C-21 K-9 Injection Profile~ 09/08/87 #1 11550-11925 Schlum 5" Production 09/10/87 #1 11550-11862 Schlum 5" Injection Profile 09/11/87 #1 10390-10914 Sct~lum 5" Completion Record,! 09/12/87 #1 9112-9214 Schlum 5" CBT 09/12/87 #1 9054-9922 Schlum 5" Recei red  ~as~ nllr~lon 01% & Gas Cons. Corn Victoria Aldridge I NFORHAT I ON CONTROL Well Records LR2-1 .... STATE OF ALASKA -- AL,..,KA OIL AND GAS CONSERVATION CO.. MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate ~ Pull tubing Alter Casing [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchoraqe, Alaska 99519-6612 4. Location of well at surface 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM At top of productive interval 1398' NSL, 918' WEL, Sec. 36, TllN, R13E, UPM At effective depth 1378' NSL, 1015' WEL, Sec. 36, TllN, R13E, UPM At total depth 1355' NSL, 1157' WEL, Sec. 36, TllN, R13E, UPM 11. Present well condition summary Total depth: measured true vertical 11032 feet 9114 BKB feet Effective depth: measured 10955 true vertical 9100 BKB Casing Length Size Structural Conductor 110 ' 20"X30" Surface 2686' 13-3/8" Intermediate 10366' 9-5/8" Production 1188' 7" Liner Perforation depth: measured 10484' - true vertical (Subsea) 12. 13. 5. Datum elevation (DF or KB) KBE = 64.16' AMSL 6. Unit or Property name Prudhoe Bay Unit 7. Well number B-13i (43-36-11-13) PBU 8. Approval number 7-259 9. APl number 50-829-20341 10. Pool Prudhoe Oil Pool Fee Plugs (measured) feet Junk (measured) feet Cemented Measured depth ~ue Verticaldepth BKB 454 c.f. P 110' 110' 5766 c.f. P 2686' 2686' 1062 c.f.Class G 10366' 8632' 365 c.f. PFC 517 c.f. Class G 9844'-.11032' 8268'-9114' 10896' (5 intervals) Tubing (size, grade and measured oSeCp'~' - 8952' 7" 26# L-80 IJ4S Tubing @ 9849' Packers and SSSV (type and measured depth) Stimulation or cement squeeze summary Intervals treated (measured) Squeezed: 10842' - 10844' Treatment description including volumes used and final pressure SE~ Y q 9S7 Representative Daily Average Production or Injectiol~.~{~¢l~0~% & ~,B¢~'~e' Prior to well operation Subsequent to operation OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 17,500 bbls Tubing Pressure 1650 17,500 bbls 1100 14. Attachments Daily Report of Well Operations,l~ Copies of Logs and Surveys Run E3 15. I hereby certify that the foregoing is true and correct to the best of my knowledge '~'~g n ed ¢~.. 5. 12_1.85 ~Form 10-404 Rev. ~ Title Division DrillinE Engineer S u bDmati p , cFat ATTACHMENT I WELL B-13i WORKOVER PROCEDURE SUMMARY 1. Rigged up slickline. Pulled SSSV. Shifted sliding sleeve open. 2. Circulated and conditioned well to filtered seawater. 3. Set BPV in tubing hanger. 4. Moved in rig. Nippled down tree. Nippled up and tested BOPE to 5000 psig. Pulled BPV. 5. Pulled 4-1/2" tubing. RIH and recovered SBR slick joint. RIH, milled and recovered 9-5/8" production packer. 6. RIH with 6" bit. Drilled out EZ-Drill bridge plug at 10,835'. Cleaned out junk to new PBTD - 10,955'. 7. RIH with 7" and 9-5/8" casing scrapers. 8. RIH with 7" RTTS and set inside top of 7" liner. 9. Pressure tested 9-5/8" casing and liner lap to 2500 psig. POH. 10. RIH with liner PBR polish mill. Polished 7" tie-back. 11. RIH with 7" seal assembly on 7" tubing. Located liner PBR. 12. Changed 7" x 9-5/8" annulus over to 9.6 ppg NaC1. Stabbed into PBR and landed tubing. 13. Set BPV in tubing hanger. Nippled down BOPE. Nippled up and tested tree to 5000 psig. ~~~ 14. Moved rig off. 15. Reperforated the following interval at 6 spf. 10780' - 10822' BKB (Ref. BHCS/GR, 1/10/79) 16. Perforated the following additional intervals at 6 spf: 10484' - 10502' BKB (Ref. BHCS/GR, 1/10/79) 10675' - 10685' BKB (Ref. BHCS/GR, 1/10/79) 10844' - 10876' BKB (Ref. BHCS/GR, 1/10/79) H/kb/2OO5D 17. Perforated the following additional interval at 1 spf: 10876' - 10896' BKB (Ref. BHCS/GR, 1/10/79) 18. Set and tested SSSV. 19. Put well back on injection and tested. /?H/kb/2005D SAPC Daily Dri 1 i ing Report -- PBU May 4, 1987 at 0600 hours Rig' Nabors 1ES Well' B-13i (43-36-11-1 3) 0600 Depth' Day' 1 24-Hour Ftg- ' Water Used' Current Operation- Nippling up BOP's. Accept rig at 0900 hours on 5/3/87. Moved on location. Rigged up. Attempt to pull BPV. Well flowing. Bullhead brine into tubing and casing tubing annulus. Install TWC. N.D. tree. N.U. BOP. MUD TYPE- WT' VIS- PV' YP' FL' SOLIDS- TEMP-°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES · DLS ,. 1606h- SAPC Daily Drilling Report - P';ltl May 5, 1987 at 0600 hours Rig: Nabors 1ES Well' B-13i(43-36-11-13) 0600 Depth' Day' 2 24-Hour Ftg' ' Water Used' Current Operation' RIH with fishing tools. Test BOPs. Shear out SBR and pull tubing. MUD TYPE- WT: VIS: PV- YP' FL' SOLIDS' TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 1606h' SAPC Daily Drilling Report -- PBU May 6, 1987 at 0600 hours Rig: Nabors 1ES Well: B-13il43-36-11-13) 0600 Depth: Day: 3 24-Hour Ftg: ' . Water Used: Current Operation' Milling on packer @ 9801'. RI.H~with fishing tools. Latch on and pull SBR polished riser. Rig up and pump a lO0 bbl Litesal LCM pill. POH. RIN with mill. MUD TYPE- WT: VIS: PV: YP: FL: SOLIDS: TEMP:°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 1606h: SAPC Daily Drilling Report -. PBU May 7, 1987 at 0600 hours Rig: Nabors 1ES Well: B-13i(43-36-11-13). 0600 Depth: Day: 4 24-Hour Ftg: ' Water Used: Current Operation' Milling on Bridge Plug. Mill 9-5/8" packer. POH wi th packer tail assembly. RIH wi th 6" mill. Clean out fill from 10,412' to 10,835'. Milling on bridge plug at 10,835'. MUD TYPE- WT: VIS: PV: YP: FL: SOLIDS: TEMP:°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 1606h: SAPC Dai~y Drilling Report -- P~lU May 8, 1987 at 0600 hours Rig' Nabors 1ES Well' B-1 3i (43-36-11-1 3t. 0600 Depth' Day' 5 24-Hour Ftg' ' Water Used' Current Operation' RIH with scrapers. Milled bridge plug and cleaned out to 10,955'. RIH with scraper combo BHA. MUD TYPE- WT: VIS: PV' YP' FL' SOLIDS' TEMP'°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 1606h' SAPC Daily Drilling Report -- PBU May 9, 1987 at 0600 hours Rig: Nabors 1ES Well: B-13i(43-36-11-13)AFE 0600 Depth: Day: 6 24-Hour Ftg: ' Water Used: Current Operation: NU BOP's. Made combo scraper run. Tested 9-5/8" x 13-3/8" annulus to 1000 psi - O.K. Ran bridge plug. Tested casing and lap to 2500 psi - O.K. Unable to pull 9-5/8" primary seals. Replaced tubing spool with new secondary and tested - O.K. NU BOP's. MUD TYPE- WT: VIS: ?V: YP: FL: SOLIDS: TEMP:°F ~ MD ANGLE DIRECTIQN TVD SECTION COORDINATES DL$ 1606h: Rig: N~bors 1ES Well{ B-13i(43-36-11-13) SAPC Daily Drilling Report -- PBU May 10, 1987 at 0600 hours 0600 Depth: Day: 7 24-Hour Ftg: ' Water Used: Current Operation: POH with junk basket. NU and tested BOP's. RIH and retrieve storm packer. RIH. Unable to latch retrievable bridge plug. POH. Found junk marks on retrieving tool. RIH with globe basket and 3 boot baskets. Reverse circulate. Circulate high vis. sweep. POH. MUD TYPE- WT~ VIS: PV: YP: FL: SOLIDS: TEMP:eF SURV~ MD ANGLE DIRECTION ~ ~ECTION COORDINATES DL~ 1606h: SAPC Daily Drilling Report -- PBU May 11, 1987 at 0600 hours Rig: Nabors 1ES Wells B-13i(43-36-11-13) 0600 Depth: Day: 8 24-Hour Ftg: ° Water Used: Current Operation: POH with mill prior to dummy seal run. Boot baskets had cuttings, part of packer slips and bands. RIH and recovered bridge plug. Well taking 1/2 bbl/mln. RIH with mill and polished tie-back. POH. MUD TYPE- WT: VIS: PV: YP: FL: SOLIDS: TEMP:°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 1606h: SAPC Daily Drilling Report -- PBU May 12, 1987 at 0600 hours Rig: Nabors 1ES Well: B-13i(43-36-11-13' 0600 Depth: Day: ~'~ 24-Hour Ftg: Water Used: Current Operations Running 7" tubing. Lay down PBR Mi11. Test 9-5/8" x 13-3/8" annulus at 1000 psi. O.K. RIH with Dummy Seal Assembly and test at 1000 psi. O.K. POH. Change Rams. RIH with 7" tubing. MUD TYPE- WT: VIS: Pr: YP: FL: SOLIDS: TEMP:°F ~ __~ ANGLE DIRECTION T~ _ ~ COORDINATES DL$ 1606h: SAPC Daily Drilling Report -- PBU May 13, 1987 at 0600 hours Rigs Nabors 1ES Well: B-13i(43-36-11-13) 0600 Depth: Day: 10 24-Hour Ftg: ' Water Used: Current Operation, Moving to B-16. Ran 7" tubing. Pump 250 bbl 9.6 Nat1 + 15 bbl diesel don annulus. Stabbed seal assembly and test at 2100 psi. O.K. Pumped 25 bbl diesel into tubing. N.D.B.O.P.'s. NU and test tree to 5000 psi. O.K. Set BPV. Release rig at 1800 hours on 5-12-87. MUD TYPE- WT: VIS: PV: YP: FL: SOLIDS: TEMP:'F SURVEY ~ ANGLE DIRECTION TVD SECTION COORDINATES DL$ 1606h: Slot~dord Alosi~c '~' P~oduction Cornt. 900 I~o,,! Be..,o. P, oule~o,,.I P 0 Bo. 196612 A,~(ho, oge. AIo~ko 99519 6612 J9071 564 51 II INDEXED DA1.LAS ARCO CHEVRON STANDARD ,"~1/~F)K/.. P[,)()I )t J(~ l'lC)bJ EXXON TEXACO Da1.e: 08/26/87 lO: blOBIL T#: 78154 PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-13 A-15 A-15 B-6 B-13 C-8 F-4 H-3 Q-5 s-2 Y-12 Y-12 Y-23 WOPITS 07/31/87 #1 9300-9815 Camco 5" Production Profile 07/29/87 #1 10650-10950 Camco 5" Flowmeter 08/06/87 #1 10500-11000 Camco 5" Production Profile 08/11/87 #1 8400-9200 Camco 5" Injection Profile 07/20/87 #1 10350-10900 Camco 5" Collar · 08/05/87 #1 10000-10240 Camco 5" Production Profile 08/01/87 #1 10100-10525 Camco 5" CCL 07/25/87 #1 8800-10096 Camco 5" Flowmeter/Temp. 08/06/87 #2 10100-10365 Camco 5" PITS 08/03/87 #1 10400-11294 Camco 5" Production Profile 08/02/87 #1 9000-9310 Camco 5" Flowmeter 08/06/87 #1 9000-9300 Camco 5" Production Profile 08/02/87 #1 10950-11510 Camco 5" Rece i ved Da t'e Cons, Colt~lrlis.~in. "~ ~ Victoria Aldrid§e INFORH^T ION CONTROL Nel I Records LR2-1 Standmd Alaska '~ Productlon Compan 900 Eos! Benson BOuI,~ . d P.O. Box 196612 Anchorage, Alaska 99519-66 (907) 564.511 I INDEXED DALLAS ARCO CHEVRON E~Y~XON TEXACO Date: 08/05/87 TO: MOBIL TI: 78103 PHILLIPS STATE OF ALASKA GEOSC IENCES STANDARD A C' . ._ ,-~L A.~F'A, PRODt jcl TION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returnlng it to this office: B-13 G-3 N-18 Perf. Record 08/02/87 #1 10382-10880 Sch Perf. Record 07/27/87 #1 8800-9250 Sch 5" CNL/GR 07/31/87 #2 9490-10062 Sch 5" Rece i ved Date A umt at the or,ginol Standard O,I Company Founded ,n Cleveland. Ohio. ,n t87¢) Victoria Aldridge INFORMATION CONTROL Well Records LR2-1 Standard Alaska Production Compo~'~'''' 900 Easl Benson Be Jrd P.O. Box 196612 Anchorage. Alaska 99.519-6612 (907) 564.511 I INDEXED DALLAS . ARCO CHEVRON E,Y~XON TEXACO Date: 07/31./87 TO: MOBIL T~: 78088 PHILLIPS STATE OF AnASr, A GEOSC IENCES STANDARD Al. ASKA f~F;(][)[Jd FiON REFERENCE: SAPC CASED HOLE FINAL LOGS The following material ls being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning tt to this office: Temp. 07/20/87 #1 10500-10924 Camco 5" Temp. 07/20/87 #1 Surf-3150 Camco 2" Prod. Profile 07/01/87 #1 10250-10650 Camco 5" Prod. Profile 07/06/87 #1 10550-10880 Camco 5" Temp. 07/12/87 #1 Surf-3000 Camco 5" Temp. 07/14/87 #1 0-3000 Camco 5" Temp. 07/21/87 #1 Surf-2057 Camco 5" Injection Profile 06/30/87 #1 8600-8975 Camco 5" Perf. Record 07/26/87 #2 10100-10563 Sch 5" Spinner 07/14/87 #1 9850-10350 Camco 5" InjeCtion Profile 07/16/87 #1 9150-9534 Camco 5" Victori'a Aldridge ~ NFORMAY ~ ON CONIROL We~ ~ Records LR2-1 Standard Alaska Production Compam 900 East Benson Bouh, P.O. Bo~ 196612 Anchorocje, Alaska 99519-6612 (907) ,564-5 TO: DALI, AS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES * RESERVOIR * DRILLING REFERENCE: SAPC CASED HOLE FINAL LOGS - INDEXED STANDARD ALASKA PRODUCTION Date: 07/14/87 TI: 78041 The following material Is being submit-red herewith. Please acknowledge receipt by signing a copy of This letter and returning IT To This office: * B-12 B-13 E-II F-24 F-29 F-31 M-16 M-16 M-16 U-4 U-5 Production Log 07/09/87 al 8850-9427 Sch 5" DFT/Borehole Audio Trmcer Survey 06/10/87 al 1800-10730 CCL/Perf. 06/04/87 al 9450-10753 Go 5" Temp. 06/02/87 al 11800-12315 Go 5" CCL/Perf. 06/03/87 al 9950-10215 Go 5" CCL/Perf. 06/03/87 al 9200-9500 Go 5" Hydro 06/10/87 al 10900-11460 GO 5" CFS 06/10/87 al 10850-11580 Go 5" GR 06/10/87 al 10900-11575 Go 5" CCL/Perf. 06/06/87 al 10800-11700 Go 5" GR 06/02/87 al 8580-9400 GO 5" 5tI * ONLY this log is being sent to Reservoir & Drilling. Rece I ved  v I NFORNAT I ON CONTROl_ Date ....... ~.~. ¢.nmmJ.~.~iOll Well Records LR2-1 r ~lasR~ u. ~ ~ ~' ........ A u.. o, ,h. o,~.o, s,a~o,dc~, p¢~'~,., Anchorage Founded in Clevelond. Oki8?0 Production ~)mpany 900 East ~n$ofl Boulevard P.O. Box 196612 Anchorage. Alaska 99.519-6612 (907) 564-51 I I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD ALASKA PRODUCTION Date: 06/18/87 77970 REFERENCE: SAPC CASED HOLE FINAL LOGS The following ma?erlal is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: A-3 A-7 B-13 B- 23 E-ii U-5i R- 23 Injection Profile 06/0 2/87 #1 11000-11963 Camco 5" F1 owme ter WHUT 06/01/87 #1 11450-11808 Camco 5v Injection Profile 06/0 2/87 #1 10500-10853 Camco 5" CCL-GR 06/05/87 #1 9880-988 2 Camco 5" WOPITS 06/5-6/87 #1 10300-10740 Camco 5" Injection Profile 06/05/87 #1 8750-9437 Camco 5" WOPITS 06/04/87 #1 11 200-1 2118 Camco 5" i',,zL ' E ~d:.:.,:~!(a Oil & Gas Cons. Commission Anchol ~,r. T9 Received ~ Ce lina Plack INFORMAT ION CONTROL Wel I Records tR2-1 Date A unit of the o, iginol $1ondard Od Company Founded in CleYelond. Ohio. *n 1870 ........ STATE OF ALASKA ALA .... OIL AND GAS CONSERVATION COM~,,,,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing ]~ Amend order FJ Perforate L~ Other 5. Datum elevation (DF or KB) KBE = 64o16' AMS]', 2. Name of Operator Standard Alaska Production Company 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM At top of productive interval 1398' NSL, 918' WEL, Sec. 36, TllN, R13E, UPM At effective depth 1378' NSL, 1015' WEL, Sec. 36, Tlll% R13E, UPM At total depth 1355' NSL, 1157' WEL, Sec. 36, TllI~, R13E, UPM 6. Unit or Property name Prudhoe Bay Unit 7. Well number B-13i (43-36-11-13) PBU 8. Permit number 78-83 9. APl number 50-029-20341 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 11032 feet Plugs (measured) 9114 BKB feet Effective depth: measured 10835 feet Junk (measured) true vertical 8971 BKB feet Casing Length Size Cemented Measured depth Structural Conductor 110' 20"X30" 454 c.f. P 110 ' Surface 2686' 13-3/8" 57~6 c.f. P 2686' Intermediate 10366' 9-5/8" 1062 c,f,Class G 10366' Production 365 c,f, PFC 1188' 7" 517 c.f. Class G 9844'-11032' Liner Perforation depth: measured 10608' - 10675' 10714' - 10734' 10685' - 10704' 10744' - 10822' true vertical (Subsea) 8742' - 8790' 8819' - 8833' 8840' - 8897' Tubing (size, grade and measured de'"p"tll)' ' 8811' 4-1/2" 12.6# L-80 A/B Mod. Buttress IPC @ 9879' Packers and SSSV (type and measured depth) q-~/~" ~ ._qz~ P_~_cker @ 9783': n_-!/2" SSSV @ 2!9!' 12.Attachments Description summary of proposal [] Detailed operations program ~ue Verticaldepth BKB 110' 2686' 8632' 8268'-9114' BOP sketch [] 13. Estimated date for commencing operation April, 1986 14. If proposal was verbally approved Name of approver Date approved 'i ,, i¢,,5. I hereby certify that the foregoing is true and correct to the best of my knowledge 'Signed~'" ,~. ~. ~ Title Divi~iQn Drilling Engineer Commission Use Only Conditions of approval Approved by Form 10-403 Rev 12-1-85 Notify commission so representative~.may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance ~ '-~)--~?~ AP~:~'~-' , 'ii~ Commissioner ' 'th~"~omm~s~on Date~'-/~ 0 Y ~ Submit in triplicate ATTACHMENT I WELL B-13 WORKOVER PROCEDURE OUTLINE 1. Rig up slickline. Pull SSSV. Shift sliding sleeve open. 2. Circulate and condition well to filtered seawater. 3. Set BPV in tubing hanger. 4. Move in rig. Nipple down tree. Nipple up and test BOPE to 5000 psig. Pull BPV. 5. Pull 4-1/2" tubing. RIH and recover SBR slick joint. RIH, mill and recover 9-5/8" production packer. 6. RIH with 6" bit. Drill out EZ-Drill bridge plug at 10,835'. Clean out junk to new PBTD - 10,950'. 7. RIH with 7" and 9-5/8" casing scrapers. 8. RIH with 7" RTTS and set inside top of 7" liner. 9. Pressure test 9-5/8" casing and liner lap to 2500 psig. POH. 10. RIH with liner PBR polish mill. Polish 7" tie-back. 11. RIH with 7" seal assembly on 7" tubing. Locate liner PBR. 12. Change 7" x 9-5/8" annulus over to 9.6 ppg NaC1. Stab into PBR and land tubing. 13. Set BPV in tubing hanger. Nipple down BOPE. Nipple up and test tree to 5000 psig. 14. Move rig off. 15. Reperforate the following interval at 4 spf. 10780' - 10822' BKB (Ref. BHCS/GR, 1/10/79) 16. Perforate the following additional intervals at 4 spf: 10484' - 10502' BKB (Ref. BHCS/GR, 1/10/79) 10675' - 10685' BKB (Ref. BHCS/GR, 1/10/79) 10844' - 10876' BKB (Ref. BHCS/GR, 1/10/79) pm/ 1605D 17. Perforate the following additional interval at 1 spf: 10876' - 10896' BKB (Ref. BHCS/GR, 1/10/79) 18. Set and test SSSV. 19. Put well back on injection and test. m/1605D B.O.P. STACK CONFIGURATION 13-5/8 IN. TRIPLE RAM STACK SO00 PSI WP DRILLING ANNULAR PREVENTER ,t ], PIPE RAMS ! ! BLIND RAMS I I , 2 IN. KILL LINE GATE GATE DRILLING SPOOL i PIPE RAMS I 4 IN. CHOKE LINE ~HyO. ASST~ GATE GATE INDEXED SOHIO ALASKA PETROLEUM COMPANY ~o: DAL/UNIT/STATE: REFERENCE: (-Marathon) DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE- BPAE (Transmittal Only) , - 3 ! 11 "C" STREET ANCHORAGE. ALASKA TELEPHONE 19071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: T#: 03/13/86 76934 SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-ii Step Rate 02/12/86 Camco B-13 Step Rate 02/13/86 Camco C-12 Static Gradient 02/11/86 Camco C-12 Static Gradient 02/29/86 Camco D-13 BHPD 01/30/86 Camco Static Gradient 01/30/86 Camco K-4 Static Gradient 02/25/86 Camco G-3 Static Gradient 02/09/86 Camco H-9 Step Rate 02/14/86 Camco J-9 Static Gradient 02/09/86 Camco N-19 Flowing Gradient 02/09/86 Camco U-8 Static Gradient 02/22/86 Camco X-10 Static Gradient 02/19/86 Camco Y-5 Step Rate 02/18/86 Camco Y-6 Static Rate 02/15/86 Camco Y-18 Step Rate 02/21/86 Camco SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON EXXON To: DAL/UNIT/STATE: TEXACO (-.Marathon) MOBIL PHILLIPS 31 ! 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907! 265-0OO0 MAIL: POUCH 6-6 ! 2 ANCHORAGE. ALASKA 99502 Date: 03/07/86 T~: 76922 STATE OF AK BPAE GEOSCLENCES REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-II "~ B-9 ~B-13 G-5 '"~M-20 ~M-22 '"~M-24 "~R-13 U-8 X-5 X-23 Y-5 Y-18 Injection Profile-Spinner !! I! I1 II !1 Caliper Injection Log Injection Profile-Spinner Temperature Survey Spinner Spinner/Temp. Spinner Spinner Spinner Pump-in Temp. Survey Injection Profile Spinner Injection PrOfile Spinner Injection Profile Spinner-Temp. 02/12/86 #1 9600-10430 02/20/86 #1 9600-9960 02/13/86 ~1 10500-10760 02/13/86 #1 Surf-9500 02/14/86 #1 9600-10000 11/16/85 #1 10600-11640 02/28/86 #1 9200-9700 03/01/86 ~1 10100-10700 02/27/86 #1 9000-9410 03/02/86 #1 9600-9900 10/29/85 #1 9350-9830 Camco 5'! Camco 5" Camco 5" Camco 5" Camco 5" Camco 5" Camco 5" Camco 5" Camco 5" Camco 5" Camco 5" 10/31-11/1/85 #1 9950-10730 Camco 5" 02/26/86 #1 11400-11820 Camco 5" 02/18/86 #1 9750-10120 Camco 5" 02/21/86 #1 10600-11400 Camco 5" · RECEIVED DAT[ . ._ Ancn0ra~8 .~ 19 Victoria Aldridge LR2-1 INFORMATION CONTROL WELL RECORDS LR2-1 SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 September 1 8, 1 985 Alaska Oil & .Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' l;ir; C.V, Chatterton Well A-3'.A-8; A-27, B-13' H-9,'Y-6, Y-ll, and Y-18 PBU Gentlemen' Enclosed in duplicate, is Form 10-403, Sundry Notices and Reports on Wells for the above named wells- These contain our subsequent reports of. having converted them from oil wells into water injection wells, Yours very truly, k SOHIO ALASKA PETROLEUM COMPANY M. D. Martin Senior Petroleum Engineer RECEIVED Enclosures cc' T. N. Tyler, (MBg-2) Well Records, (LR2-1) Drilling Well File #17 OCT 0 7 1985 Alaska 011 & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COiv~MISSION $/I_NDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator SOHIO Alaska Petroleum Company 3. Address P, O, Box 196612' Anchorage, Alaska 99519-6612 4, Location of Well At Surface' 1608' WEL, 1740' SNL, Sec. 31, TllN, RI4E, UPM 7. Permit No. 7f~-g3 8. APl Number 5o-029-20341 9. Unit or Lease Name pri_,dhee Bay Unit 10. Well Number B-13 {43-36-11-13)PRU 11. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. _ KBE : 64~16' AHSI I ADi 28286 Prudhoe Oil 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pool SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other X[] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). This well was converted from a Prudhoe Bay production well into a water injection well for Western Peripheral Wedge Zone (W~P'W'Z.) on September 15' 1985, Water was injected through the following perforations at 4 s. p~ f, 10608' -- 10675' BKB 10685' -- 10704' BKB 10714' -- 10734' BKB 10744' -- 10822' BKB 1_4~ I hereby certify that the foregomg is ~true and correct to the best of my knowledge. ne~t Title Seni or Petrol eum Enqineer he space below for Commission use Donditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate Form 10-403 and "Subsequent Reports" in Duplicate R~.v_ 7-14~0 SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502~612 August 21, 985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr. C.V. Chatterton Wells A-3, A-8, A-16, A-27, B-13, H-9, U-3, U-9, Y-3, Y-6, Y-11, and Y-18 PBU Gentlemen' Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named wells. These contain our proposals to convert them from oil wells into water injection wells. Yours very truly, Michael D. Martin Sr. Petroleum Engineer Enclosures cc' T. N. Tyler Well Records (LR2-1) Well File #17 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED W E L LX[~ OTHER [] 2. Name of Operator 7. Permit No. SOHIO Alaska Petroleum Company 78-83 3. Address 8. APl Numbe[ P. O. Box 6612, Anchorage, Alaska 99502 5o_029-20341 4. Location of Well At Surface: 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE : 64.16' AMSL 12. I 6 . Lease Designation and Serial No. ADL 28286 9~Unit or Lease Name rudhoe BayUnit 10. Well Number B-1 3(43-36-11 -1 3)PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other I~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). With reference to the previous Sundry Notices dated' May 23, 1979; July 30, 1979; June 5, 1984; and November 19, 1984, for the perforation of B-13 in the 7" liner~ it is intended to convert this Prudhoe Bay production well into a seawater injection well for WPWZ Waterflood Project. Water will be injected through perforations (4 spf) at' 10608' -- 10675' BKB 1 06851 -- 10704' BKB 10714' -- 10734' BKB 10744' -- 10822' BKB 1 i~g. nlehereby certify that the foregoing is true and correct to the best of my knowledge. ~~~Title Senior Petroleum Engieer space below for Commission use Conditions of APproval, if any: ORIG:NAI. SIGNED BY NAltR¥ IV. KgGLEI Approved by COMMISSIONER Approved Copy Returned By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate / / SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CttEVRO~ ETLON T~,',C4CO HOB~L PHiLLipS BP~ 31 ! ! '°C" ANCHORAGE, ALASKA TELEPHONE 19071 265~0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: T#'.~6323 FIE~FERENCE: The following material · . a,,,~ return/n,. :.. ',~-~wit~.~ COpy ot th~s letter ~..., ~s being submitted ~, .... ' ~ ,t ~o this off/ce. ~ '~,,~e acknowledge receil3t t)y signing a N-7 J B-9-'~ Temp. 5/24/85 //1 ~- 9900-10529 GO 5" Temp. 7/05/85 //1 11500-11980 Camco ' 5" B-13 "Temp. 7/03/85 #1 9650'-10083 Camco U-3.-' Sptnner 7/04/85 //1 10350_10775 5" ~ 7/04/85 #1 Camco 5" 9100-9500 Camco 5" ntCt~vtTO Alaska Oil & Gas Cons. Commissi~ct. or~a Aldr Ang~orage z'ecnnio_~, ,. ldge LR2-1 -'~" u°cttmentation Records Management INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS ~ STATE ~"~ . BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: T#: 7/19/85 76322 REFERENCE: SOHO FINAL DATA - PRESSURE SURVEY DATA - ~e following material is being submitted herewith. Please acknowledge receipt by signing a ~/copy of this letter and returning it to this office:-- A-3 ~' Static Gradient B-9 r Static Gradient B-13- Static Gradient D-6/~..'PBU & BHPD D-7' ~ PBU & BHPD H-8'''~' 'Static M-5~ Static Gradient N-5'-~ B~IPD & Falloff N-8/, B~IPD & Falloff X-7~ PBU & BHPD X-10 ~/ Flowing Gradient X-267 PBU & BHPD 7/05/85 7/03/85 7/04/85 7/08/85 6/22/85 7/06/85 7/06/85 3/04/85 2/Ol/85 7/03/85 7/06/85 6/20/85 RECEIVED DATE 19 LR2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON To~ SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907l 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: T#: 5-13-85 76188 REFERENCE: S~/0 CASF. D HOLE FTNAL LOGS  l~h~e following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- ~ -¥<~£13:/ ~ Spinner 4-12-85 10500-107 95 Camco #1 Y-2 Spinner 4~10-85 10150-1.0500 Camco #1 n[C[ v[O [')A fi ~aska Oil & Gas Cons, OOF~IITjjSS/OI',~ Anchorage ~9 Cathy Perkins LR2-1 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 November 16, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Gentlemen: Mr. C. V. Chatterton Well B-13 (43-36-11-13) Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. Yours very truly, Enclosures cc: A. E. Leske Geology Well File #17 . Bragg '~/ rict Petroleum Engineer (Acting) RECEIVED 5,. ~;,~ '~'~ .~ ., C~i ~-,C", STATE OF ALASKA .... A ALASK ,LAND GAS CONSERVATION .:./IMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] · 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 78-83 .. 8. APl Number 3'Addr~so.o BOX 6612, Anchorage, Alaska 99502 50_029-20341 4. Location of well at surface 9. Unit or Lease Name 1608' ~IL, 1740' SNL, Sec. 31, TllN, R14E, UPM Prudhoe Bay Unit-. At Top Producing Interval 10. Well Number 918' WEL, 1398' NSL, Sec. 36, TllN, R13E, UPM B-Z3 (43-36-11-13) At Total Depth 11. Field and Pool 1157' WEL, 1355' NSL, SeC. 36, TllN, R13E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 64.16' AMSLI ADL 28286 . 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 12-7-78 1-.10-79 1-17-79I feet MS L One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost l1032'MD 9114'TVD k0989'lVD 9074'TVD YES ~ NO []I 2114' feet MD 22. Type Electric or Other Logs Run DIL/SP/GR, BHCS/GR ~'3. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SiZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 30" x 20" En'sulated2onductor' Surface 110' 36" 454 cu. ft. Permafrosh_ 13 3/8" 72~ L-80 Surface 2686' 17 1/2" 5766 cu. ft. Permafrost ....9 5/8" 47# L-80 Surface 10387' 12 1/4" 1062 cu. ft. Class G; 365 cu. ft. PFC 7" 29~ L-80 Surface 11032' 8 1/2" 517 cu. ft. Class G , 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. ': TUBING RECORD interval, size and number) ~ r~V=Dss SIZE DEPTH SET (MD) PACKER SET (MD) Pr~clhoe Oil Pool Top: 10608' 8?42' 4 ._1/2" 9880' 9786' BOtb:)m: 10822' 8903' "26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10608'-10675' BKB (8742'-8790' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10685'-10704' BKB (8797'-8811' TVDss) 10714'-10734' BKB (8819'-8833' TVDss) 10744'-10822' BKB (.8840'-8903' TVDss) ,,, 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 7-14-79 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PER~O~ * I '~loW Tubing Casing Pressure CALCULATED OIL-BBL .GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24,HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Alaska 0il & ..... Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. .30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GO[R, and time of each phase. BKB Subsea Sag River SST. 10475 ' 8646 ' Shublik 10508 ' 8670 ' Ivishak 10604, 8739, - 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge .;~ °/~ ./~ District Petroleum Engineer //~/~¢ Signed ~./ld/L(,/'J /1,.~ Title Date /! .... , _ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which.elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple s'~.age cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". STATE OF ALASKA .... ALASKA . AND GAS CONSERVATION CC .VlISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL:I~ · . 7. Permit No. 2. Name of Operator Sohio Alaska Petroleum Company 78-83 3. ~,ddress 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50029-20341 4. Location of Well OTHER [] At Surface: 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64.16' AMSL I 6 . Lease Designation and Serial No. ADL 28286 t2. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-13 (43-36-11-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ,. · b.e followLng addltlonaZ i~te.t-~aZ ~ras pe~£orated Nov~ 11, 1984 uslng $¢hlt~berger 2 7/8" Hyperdomes at 4 spf. A lubricator was installed and tested to 3500 psi on all well work. 10608'-10675' BKB (Ref. BHCS/GR, 1/10/79) An SSSV was set and"tested in the ball valve nipple at 2114'. 14./~hereby certify that the foregoing is true and correct to the best of my knowledge. 'he spa~etow for Corn_mission use v -- ond~t~n/of APproval, if any: V Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate .... STATE OF ALASKA --. ALASKA .AND GAS CONSERVATION CC MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well ~ Workover ' 2. Name of operator 7. Permit No. Sohio Alaska Petroleum Company 78-83 3. Address 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50029-20341 4. Location of Well at surface 1608' WEL, 1740' SNL, Sec. 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64.16' AMSL 31, TllN, R14E, UPM J6. Lease Designation and Serial No. ADL 28286 November For the Month of. ,19__ 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run 16. DST data, perforating data, shows of H2S, miscellaneous data See Attached 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. B-13 (43-36-11-13) PBU 11. Field and Pool Prudboe Bay Prudhoe Oil Pool 84 I~ ~-I~-~ ·'~ /6 ~ /~ /"~ ~? ~' ~ /7/0_ / f ~/~/'c h District Petroleum Engineer ~ TITLE. . DATE hOTE--R/p/rt on this form is required calendar month, regardless of the status of operations, and must be filed i/a duplicate with the Alaska Oil and ~a_s/Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate PERFORATING DATA - Well B-13 (43-36-11-13) PBU November 11, 1984: Rigged up Schlumberger and perforated the following additional interval using 2 7/8" Hyperdcmes at 4 spf: 10608'-10675' BKB (Ref. BHCS/GR, 1/10/79) Put well on production. November 16, 1984: Set and tested SSSV in ball valve nipple at 2114'. Well on production. SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 October 5, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells B-ii, B-13, and B-26 Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. The~e contain our proposals to perforate these wells. JAB/J¢>'~pjw Enclosur es strlct Petroleum Enginee~ (Acting) cc: J. D. Hartz Geology Well File 917 RECEIVED AlasKa 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ..... ALASt. .OIL AND GAS CONSERVATION )MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL~ OTHER [] 2. Name of Operator Sohio Alaska Petrole~~n Cc~oany 3. Address P.O. BOX 6612, Anchoraqe, Ala.~ka 4. L~cation of Well 99502 At Surface: 1740' SNL,'1608' WEL,'Sec. 31, TllN, R1-4E, UPM I 6. Lease Designation and Serial No. ADL 28286 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64.16' AMSL 7. Permit No. 78-83 8. APl Number 5o-029-20341 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-13 (44-36-11-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate E~ Alter Casing [] Perforations Stim u late [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following additional interval will be perforated in October, 1984, using Schlumberger' 2 7/8" Hyperdom~s-at 4 spf. A lubricator will be installed and tested to 3500 psi for all well work. 10608 '.-10675 ' BKB (Ref. BHCS/GR, 1/10/79) An SSSV will be set and tested in the ball valve nipple at 2101'. Form N°l~-~ Dated RECEIVED AlasKa 0il & Gas Cons. Commission Anchorage ~ for Com__missio_n use Conditi~nslof Approval, if any: hereby certify that the foregoing is true and correct to the best of my knowledge. Title DisC,riot :Petroleum Dng±neer Date Approved by Approved Copy Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY SFO CHEVRON EXXON TO~ SFO/UNIT/STATE: GETTY (-Mar a t-ho n) · MOBIL PHILLIPS --S ZE " BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only) 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL' POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 2/4/83 Trans. H:- CC#: 56104 REFERENCE: O © CASED FINAL LOGS HOLE, The following material is being submitted herewith· Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: 'G-5 CNL/GR 11/30/82 H3 10150-11157 Dres 5" G-l?/, ~ DDNLL 11/21/82 Hi 10460-11342 Dres 5" R-17~fDDNLL 11/19/82 H1 10250-11150 Dres 5" R-18z DDNLL 11/29/82 Hi 9650-10514 Dres 5" ,. R-19~/ DDNLL 11/20/82 H1 9450-10301 Dres 5" .... ~F-18~'TDT-M 12/20/82 Hi 11800-12450 Sch 5" G-15 w'/ Completion Record 12/24/82 H1 8680-10995 Sch 5" ---R-9~.~ TDT-M 1,2/6/82 H1 9000-9777 Sch 5" '-~M-4/× Flowmeter 12/20/82 Hi 11200-11740 GO 5" · -M-4~' Fluid Density '12/20/82 H1 1.1200-11740 GO 5" B-12w~ Fluid Density 12/18/82 HI 8800-9400 GO 5" A-2~/ DTL 12/31/82 Hi 11000-11500 GO 5" .... F-18~EPL I2/18/82 Hi 11750-12350 Sch 5" --- R-9 ~ EPL 12/6/82 HI 9030-9430 Sch 5" · (4/82) RECEIVED DATE Victoria Aldridge Development Geology Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON To:SFO/UNIT/STATE: GETTY (-Marathon) MOBIL PHILLIPS STATE 311 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 12/8/82 Trans.#: 2913 CC~: 55913 BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only~ SOHIO FINAL DATA - PRESSURE SURVEY DATA Thefollowing materialisbeingsubmittedherewith. Pleaseacknowledgereceiptbysigninga copy of, thisletterandreturningittothis°ffice:- B-13 ~ E-10 " E_lS_~ ....... ,, E-20 .... " G-17 ~ " R-2~ " R_17-z ,, R_19~ ,, Pressure Survey & BHPD 11 11 II II II II II Otis 10/12/82 GO 10/28/82 CAMCO 10/27-29/82 GO 10/12/82 Otis 11/9/82 CAMCO 10/22/82 Otis 11/7/82 CO 11/18/82 (4/82) RECEIVED DATE Vic toria Aldridge Development Geology Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES(CC#'s-Transmittal Only) '~o: SFO/UNIT/STATE: REFERENCE: 3111 "C" SI~RE£1' ANCHORAGE, ALASKA 'IELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 11/10/82 Trans.#: 2835 CC#: 55835 SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- B-13 E-16 Spinner 10/12/82 #1 10461-10766 Otis 5" C/O Log 10/7/82 #1 Dres 5" (4/82) RECEIVEO n[c[~v[..D ..................................... Victoria Aldridge NO~ } 6 }DSg Dev(,]opmen~ Geology o~[ ............................................... ,s __. Well Records TPi-5 B-5 B-10 C-11 F-4 F-ii H-ii Q-2 --. SOH I 0 CONF I DENT I AL SOHIO ALASKA PETROLEUM COMPANY Logs Indexed 3111 "C" SIREET t ANCHOf~AGE, ALASKA ^RC_.O -- C_,~v~ 'I'ELEPHONE (907) 265-0000 ~,cx~,~ , -- MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 -. /,L~d~.~ ..... To: SFO/UN~Z/SZAZg: ~ . .~ ~ Da~e:'7/13/81 ~ 914 REFERENCE: , //SOHIO FINAL DATA ' CASED HOLE ~ The following material is bein~"~ubmitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- CNL EPL CCL/perf. CNL CNL Spinner CCL/Perf/Tie In (Sch) 5/9/81 #3 5" (Sch) 5/6/81 H1 5" (Sch) 5/12/81 #2 5" (S~h) 5/16/81 #1 5" (Sch) 5/2/81 #7 5" (Go) 6/13/81 #1 5" (Co) 6/14/81 #1 5" (Sch) 5/i5/8i #3 5" --(Sch) 5/14/81 #3 5" CNL CNL DATE Carol Krieter Development Geol6gy Well Records S0H I 0 ,,: I DENT I AL -SOHI.O ALASKA PETROLEUM COMPANY ARCO C_J~ v Foa TO: 31 11 "C" S'FREET ANCttORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL POUCH 6.612 ANCHORAGE, ALASKA 99502 Date: 6/3/81 ~ 836 ! . REFERENCE: :- SOHIO FINAL DATA The following material is being Submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: ~ . . .SFO/UNIT/STATE'.' (-Marathon) (Cased Hole Finals) Jp4~-6 Flowmeter (go) 5/19/81 ¥/1 /~B-4 Spinner (go) ' 5/17/81 ~/l ~-~ P/~'~!l'31::': Perf. CCL/Tie' In Log (go) 5/19/81 ~/~B-16 CCL (go) 5/12/81 ~/1 1! 5'~ 5~' 5" L~-H-11 Perf.CCL/Tie In Log (go) 5/8/81 ~/1 ~-H-11 CCL/Tie In Log (go) 5/10/81 ¥~1 l, 5'~ /w~- 11 DDNLL (dres) 4/18/81 P~/X-8 DD1NrLL (dres) 4/16/81 1! ~/Y- 2 Diff. Temp. Log -- - RECEIVED DATE Carol ~riet~ Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 June 3, 1981 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 Attn: Mr. H. H. Hamilton Gentlemen: Well B-13 (43-36-11-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-named well for the month of May, 1981. Enclosures cc: Well File ~17 Yours very truly, District Drilling Engineer RFCEIVFD JUN 3 198! Aiaaka 0tl o, -- ..... STATE OF ALASKA ALASKA dlL AND GAS CONSERVATION COMMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [] Workover operation ~ 7. Permit No. 2. Name of operator Sohio Alaska Petroleum Company 78-83 3. Address 8. APl Number Pouch 6-6]2, Anchorage, Alaska 99502 50- 029-20341 9. Unit or Lease Name Prudhoe Bay Unit 4. Location of Well at surface 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ~RF. = 64.16 ' AMSL I ADL 28286 10. Well No. B-13 (43-36-11-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of. May , 19 81 -- 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Well B-13 was worked over from 5/15/81 to 5/24/81. Displaced tubing & annulus to 9.d p~ NaC1. Installed & tested BOPE. (Witnessing of BOP test waived by Ben LeNorman, repre- sentative of AOGCC). Pulled 7" tubing. Cleaned out to 10987'. 13. Casing or liner run and quantities of cement, results of pressure tests Perforated 7' liner at 10856'-10860'; set EZ Drill at 10830'. Squeeze cemented thru per. forations at 10856'-10860 using 50 sks Class G w/18% salt. Cleaned out to 10830'. Pres. sure tested 9 5/8" FO and DV to 3000 psi. Ran 234 jts. 4 1/2" 12.75# L-80 IPC tubing to 9880' w/ball valve at 2101' & 9 5/8" packer at 9782'. Installed and tested Xmas tree. Set packer. Changed annulus over to 9.6 ppg. NaC1 & tubing over to diesel. Installed 2-way check in tubing hanger. Released rig at 1200 hours 5/24/81. 14. Coring resume and brief description None 5. Logs run and depth where run None 16. DST data, perforating data, shows of M2S, miscellaneous data RECEIVFD AIII~KI 011 & u,,,.~ .... ,,. ~v,,.nisslorl i 7. I hereby certify that the foregoing is true and correct to the best of my knowledge. '~ : . . Dzstrzct Drzll~g ~g~eer ~ ~ ¢ &~ S~aNSO, ) .'~ M~ ~ ..... T~rU~ ..... OA~ ....... NOTE--Repott on this form i~r~ ~r each c~endar month, rega[dless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 Submit in duplicate SOHIO ALASKA PETROLEUM COMPANY Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 ANCHORAGE, TELEPHONE (907' MAIL: POUCH Attn: Mr. Ho H. Hamilton Gentlemen: Well B-13 (44-36-11-13) Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-namedwell. This report contains our proposal to squeeze cement at the C~C to shut off water production. RHR:ja Enclosures cc: Well File 417 Yours very truly, R. Ho Reiley District Drilling Engineer STATE OF ALASKA '-- ALASK. )IL AND GAS CONSERVATION L...,MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER I'-I 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum O3mpany 78-83 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20341 4. Location of Well At surface: 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64.16' AMSL 6. Lease Designation and Serial No. ADL 28286 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-13 (44-36-11-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing r-I Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Due to high water production, we propose to squeeze cement at the ~ to shut off the water production. Operations estimated to start May 10, 1981. Program is as follows: 1. Set bridge plug across 7" liner above existing perforations. 2. Shoot hole in tubing and change well over to 9.6 ppg. NaC1 kill fluid. 3. Move in rig, nipple down Xmas tree, rig up and test BOPE. 4. Pull tubing and clean out to bridge plug with 9.6 ppg. NaC1. 5. Clean out to PBTD of 10989'. Perforate the liner at the OWC and squeeze cement. 6. Run 4 1/2" tubing with packer and gas lift mandrels. Install BPV in tubing hanger. 7. Nipple down BOPE, install and test Xmas tree, and remove BPV. 8. Displace tubing to diesel, set packer, test, secure well and move rig off. GK:ja Subseq. nent '{Vork F~epm-tec~ ' 14. I hereby ce_rti~ect to the best of my knowledge. Signed, Q ~"- ~ ~ ~_ __ ._~.._. Title District Drilling Engineer The space below for Commission use R. H. Rel~ Conditions of Approval, if any: Approved by ff~--~.'k, .... ~--~ ~ , ~_-~' ~ COMMISSIONER Form 10-403 Rev. 7-1-80 By Order of the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION ARCO TO: EXXON PHILLIPS SFO _Ll"-c'-- I-C~OMM~, ~/ / -'[ / -~--{--'1 GEOL ---1'3 j ..... I STAT TEC - '1 STAT TEC ' "I ............ 5 ~ 3111 "C" STREET '~/ ANCHORAGE, ALASKA TELEPHONE (907) 265~0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 9950~ 28/80 t/171B REFERENCE: MAGNETIC TAPES/SOHIO ollowing material is being submitted herewith. Please acknowledge receipt by signing a of this letter and returning it to this office:- ~B- Magnetic Tape 3/23/80 #2 #60366 ("~-13 ~' " " 1/30/80 #1 #60226 ~ " " 12/3 / 79 #1&2 # 60065 E-2 " " 5/23/80 #1 #60204 J-1 " " 5/23/79 #60252 Carol Krieter Well Records ~f ~/ ~ .~ .~" ~ ....... - , , · DATE SOHIO~BP ALASKA PRODUCTION DIVISION SOHIO PETROLEUM CGMPANy Division of Sohio Natural Re~urce$ Company 5FO/UNIT/STATE (-Marathon) TO: SFO/UNIT/STATE 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 '"' · , REFERENCE: , - SOHIO CASED HOLE FIN, AL DATA. . ' t following material is being su~bmitted herewith. Please acknowledge receipt by signin§ copy of lhis letter and returnin§ TDT-M Diff. Temp.. Perf. CCL Temp. Spinner Spinner Spinner Temp. CCL CCL CCL Mudlog #14 Mudlog 3/23/80 ~2 5" 7/13/79 H1 5" 2/29/80 #1 5" 3/25/80 H1 5" 3/16/80 H1 5" 2/29/80 #1 5" 2/25/80 #1 5" 3/12/80 Hi 5" 3/9-10/80 H1 5" 3/i0-ii/80 #i 5" 3/13-14/80 #1 5" 12/25/79--1/23/80 3/25/s0-4/12/s0 C'15 E-4 H-7 J-6 M-1 M-2 M-6 M-7 X-4 West Sak 4/24/80 #114 · . (State only) (State only) SFO/L~NIT/STATE: Y-6 FDC/CNL 3/4/80 H1 2" Well R&cords 19 DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION UNIT TO: _ ~i~' 'COMM ~i R% !.-_'NG MAIL: POUCH 6-6i2 / 5T,~T 3/11/80 UNIT/SFO/STATE: (-Marathon) Marathon Mobil _ Phillips SFO REFERENCE: SOHIO DATA d~I Please acknowledge receipt by owing material is being submitted herewith, signing a COpy of this letter and returning it to this office:--  EPL 1/19/80 ~1 Temp. Log 2/17/80 ~1 R-3 EPL 1/29/80 91 B-9 Pressure Survey & Data Form Otis C-2 Pressure Survey & Data Form otis D-3 Pressure Survey & Data Form Go F-4 Pressure Survey & Data Form otis G-3 Pressure Survey & Data Form Camco 11 5" 5" 2/14/80 2/22/80 2/21/80 2/5/80 DATE ~arol K~iet Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO'BP ALASKA PRODUCTION DIVISION 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: S-FATE OF ALASKA /:,!ask,.: (?;~ 6: Gas 300I F'orcuFino Drive Anchora,3$, A!at:,ka 09501 Attn: Mr. t-~. llamilton STATE/UNIT/SFO 1/21/80 ,?o/ ATE/UNIT (minus Marathen ) : REFERENCE: SOHIO WELL DATA IloWing material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to ttnis office'- C-4 G-4 A~1~12/24/79 12/10/79 C-1 12/28/79 " " " " " C-9 12/13/79 " " " " " C-10 12/22/79 " " " " " E-2 12/31/79 " " " " " E-4 12/23/79 " " " " " F-t 1/1/so " " " " " F-2 1/7/80 " " " " " F-3 1/1/80 " " " " " F-5 12/21/79 " " " " " F-6 12/23/79 " " " " " F-7 12/29/79 " " " " " F-8 1/2/80 " " " " " G-2 1/5/80 " " " " " N-1 12/7/80 " " " " " N-2 12/20/79 .......... EPL i/i/80 {{2 5" CNL 12/20/80 ~2 Bo%%om-Hele Pressure Data Form & Pressure Survey I! II Il II 11 II II II II II II II Il Pressure Bottom-Hole Pressure Data Form · . ' Ca r~ete ir i! ii 11 ii ii i1 i1 ii Ii ii 1! ii ii SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA !:'o,-cupine Drive A,,ch; age, Alaska 99501 Attn Mr. H. Hamilton MAIL: POUCH ANCHORAGE, ALAS 1/9/80 S 'O/SU:/ONZ REFERENCE: SOHIO WELL DATA e following ·material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- £/SFO/UNIT minus: FINAL CASED HOLE LOGS: Marathon Y-1 Temp. Log 12/21/79 ~1 5" X-2 Temp. Log 12/7/79 #1 5" F-6 Spinner 12/22/7~ 5" F-5 SPinner 12/20/79 ~1 5" D-9 Temp. Log 12/19/79 ~1 5" ~ Spinner 12/13/79 ~1 5" ~~ Spinner 12/9/79 #1 5" . Carol Krieter Well Records RECEIVEI~ DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA A~ska Oil & Gas Consentation 3001 Porcupine Drive Anchc:'age, Alaska 99501 Attn: Mr. H. Hamilton · , "- TELEPHONE (907) 265-(J000©"':Oz- . ~AI L: POUCH 6. ~"r'2 T~ "Fit. F~ .. REFERENCE: Well Data Transmission The following copy of this letter and returning it to this office:- '~q~e~_~c 'talpes ~or tl~e ~°11owQ-~cj ~ells TDT Run 1 #57001 material is being submitted herewith. Please acknowledge receipt by signing a 9/5/79 OH Run 1 #56045 4/29/79 Spectralog #615 8/9/79 CNL/CCL #683 11/12/79 CNL/CCL #682 10/11/79 CNL #643 9/21/79 Colette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Alaska Oil & Gas 3001 Porcupine dr. Anchorage, AK 99504 attn: Mr. H. Hamilton 3111 "C" STREE ANCHORAGE, ALA TELEPHONE (907) 26 MAIL: POUCH 6-~ ANCHORAGE, ALASK September 2 REFERENCE: Well Data Transmission The following material is being submitted herewith. Please a/ckrC6'owledge receipt by signing a copy of this letter and returning it to this office:- ~ Log's for the following Sohio operated wells: Q-5 Spinner Log 9/10/79. Q-6 " " 9/16/79 Q-3 " " 9'/12/79 Q-4 " " 9/8/79 Q-1 " " 9/2/79 B-9 TDT-M Run 1 B-10 " " B-12 " ". Colette Tracy Well Records soHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA /:~:!:.~ Oil & Gas Consentatloo " ;'o'cupine Drive /-, .c::::.age, Alaska 99501 Attn: Mr. H. Hamilton 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 ~,:,\~ I,: t'QLISH G 612 A;~'~3:,O~-;AGE, ALASKA 99502 September 13, 1979 Unit/P&P/State REFERENCE: Well Data Transmission The following material is being submitted herewith./Ple.g,,~cknowledge__ receipt by signing copy of this letter and returning it to this office:- ~ Data for the following wells: ~B-l:3 ~Initial Transient Survey~ta Packet D-6 Key Well Transient Survey "" " B-10 Initial Transient Survey " " G-7 " " " & spinner 8/9/79 8/2/79 8/8~9 8/31/79 9/1/79 ~s for the follc~ing ~,ells: G-5 CNL Rmn 1 Q-2 Spinner Run 1 SOHIO PETROLEUM COMPANY Division of Sohio Natural ResoUrces Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: S!'AT~ OF AL,':,:L,~A AL'-:':~'n Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska g9501 Attn: Mr. H. Hamilton REFERENCE: Well Data Transmission The following material is being submitted herewith. Ple.~se/acknowledge receipt by signing a copy of this letter and returning it to this office:--/ Logs for the following H-8 Spinner ?~7.~ S p i nne r ,~21 3,[,/~ Spinner-~ ~~~,/S p inner B-17 L/Temperature B-15 ',/ " B_14!/' ,, G-7 '" " G- 6 wl/ " G- 5 ""'/ " (2-'/" " B- llt./HSFM Sohio operated wells: Run 1 Run 1 Run 1 Run 2 Run 1 RUn 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Cole~te Tracy SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION July 31, 1979 Alaska Oil & Gas Conservation Conxaission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well B-13 (43-36-11-13) 3111 "C" STREET ANCHORAGE, ALASI ?, TELEPHONE (907) 265- )0-0~ MAIL: POUCH 6-61~._/~-~ ANCHORAGE, ALASKA 99562 C O'N FILF: Enclosed, in duplicate, is FomP-7, C~npletion Report for the above named well together with the Well History. This well has been perforated and is now on production. PRJ: ja Enclosures cc: Well File ~17 Colette Tracy Yours very truly, P. R. Judd District Drilling Engineer Form P--7 SUBMIT IN DUPL .FE* STATE OF ALASKA (see other In- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WEL,'. GAS m WELLI_J DRY r'-] Other b. TYPE OF COMPLETION: NEW ~ WORK DEEP-i I PLUGr--i DIFF. I---I WELLL&I OVER I---1 EN I I BACK.L_I RESER.I I Other 2. NAME OF OPERATOR Sohio Petroleum Company, Div. of Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR · Pouch 6-612, Anchorage, Alaska 995-02 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* Atsurface 1608' ~EL, 1740' S~I Sec. 31, TllN, R14Ei UPM At top prod. interval reported below 918' WEL, 1398' NSL, Sec. 36, TllN, R13E, UPM At total depth 1157' WEL, 1355' NSL, Sec. 36, TllN, R13E, UPM 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. W ~.~,0. 10. FIELD AND POOL, OR WILDCAT Prudhoe Ba¥,Prudhoe Oil Pool 1 . SEC., T., R., M., (8OTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 13. DATE SPUDDED 114. DATET.D. REACHED i15. DATECOMP, SUSP, ORABAND. I16. ELEVATIONS(~F~,RKB RT, GR, ETC)* 117. ELEV. CASINGHEAD .,/~. ~ , ! 18 TOTAL DEPTH MD&TVD 19 PLUG BACK MD&TVD)20 F MULTIPLECOMPL I ~'--~ INTERVALS DRILLED BY · ' I DEPTH _ ~ ' HOW MANY* " 121. ROTARY TOO_LS ~ CABLE TOOLS l1032'MD 9114'TVDI 10989'MD 9074'TVDI I ~~ I 22. PRODUCING INTERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* 123. WAS DIRECTIONAL ........ Top- 10685' MD 8862I TVD I SURVEY MADE ~rucLr~oe u~, ~oo±: Bottom- 10822' MD 8961' TVD ] Yes i 24. TYPE ELECTRIC AND OTHER LOGS RUN 25. DIL/SP/GR, BHCS/GR CASING SIZE 30"X20" I HOLE SIZE 110' 36" I 72~ ] T,-RO I 26R6' I ]7~" I 47~ ] L-80 I 10387' I 12~" 29# I n-80 19844-11032' 8½" 26. LINER RECORD SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* SCREEN (MD) CASING RECORD (Report all strings set in well) nsulated C~nducto~ 454 cu]. ft. P~mfr~.qt~ 1062 cu.ft. Class G: 365 517 cu. ft. Class G 13 3/8" 9 5/8" AMOUNT PULLED 28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number) 10685-10704'BKB 0.5" @ 4spf(Ref.BHCS/GR, 1/.10/79) :10714-10734'BKB 0.5" @ 4spf( ' ~'L~ ) 10744-10822'BKB 0.5" @ 4spf( 04~\" ) cu. ft. PFC 27. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 7" 9864 ' 29. ACID, SHOT, FRACTURE, CEMENT ~C~UEEZE~, E'TQ. ~ ~ DEPTH INTERVAL (MD) I AMOUNT AND KIND OF MA:TERIALUSED ~0. PRODUCT,ON DATE.~F~R~E)~I~T~I~N IPRODUCTION METHOD (Flowing, gas lift, pumplng~lze and type of pump) ~WELL STATUS (Producing or {f" 7/14/79 '-~ I Fi°w~9 I '~"'-'"' Pr~uc~g DA~-TEST: ............. I-Ho~Rs TESTED ICHOKE SIZE I PROD'N FOR OIL--BBL. GAS--MCF. WATER--BBL. IGAS--OIL RATIO OW TU G ICASlNG PRESSURE ~ CALCULATED OIL--BBL. GAS--MCF. ' WATER-BBL. I OIL GRAVITY-APl (CORR.) 31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc.) ~ TEST WITNESSED BY I 32. LIST OF ATTACHMENTS Well History ~ 33. I hereby certify that the foregd[ing~l~d.att~hed information is cornplete and correct as determined from all available records. SIGNED ~ TiTLEDistrict Drilling Engineer , P.R. JU~d~ *(See instructions and Spaces for Additional Data on Reverse Side) DATE INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement": Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28' Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME MEAS. DEPTH TRUE VERT. DEPT BKB Subsea Sag River SST. 10475' 8646' Shublik 10508 ' 8670 ' ~' Ivishak 10604 ' 8739' 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GASOR WATER. Well B-13 (44-36-11-13) WET,]', HISTORY DRILLING December, 1978 Spud well at 1600 hours, December 7, 1978. Drilled 17 1/2" hole to 2705'. Ran 70 jts. 13 3/8" 72# L-80 Buttress casing to 2686'° Cemented with 5766 cu.ft. Permafrost II cement. Cleaned out to 2716', performed formation oompetency test. Directionally drilled 12 1/4" hole to 10744', with lost circulation frc~ 10527'. Stuck pipe at 2993' while POH. Backed off, washed over and recovered fish. Cleaning out. January, 1979 Cleaned out to 9864', left partial BHA in hole while POH. Fished and recovered. Reamed hole to 10387'. Ran 265 jtSo 9 5/8" 47# L-80 Buttress casing to 10366'. Cemented in two stages: First stage with 1062 cu.ft. Class G cement; second stage through D.V. at 2340' with 365 cu.ft. Perma- frost C c~mento Arctic Packed 9 5/8" x 13 3/8" annulus. Cleaned out to 10321', tested casing to 3000 psi. Drilled out shoe, washed and reamed to 10744', drilled 8 1/2" hole to 11032' with partial returns. Ran open hole logs. Ran 29 jts. 7" 29# L-80 Buttress liner to 11032' with top of PBR at 9844'. Cemented with 517 CUoft. Class G cement. Cleaned out to I0989', tested liner to 3000 psi. Displaced well to CaC12. Ran 239 jts, 7" 26~ L-80 ~-iJ-4S tubing to PBR at 9844'. Displaced tubing to diesel, !e~nded -~abing with ball valve nipple at 2031'. Tested tubing to 3500 psi. Installed and tested wellhead, master valve and swab valve° Released rig at 0600 hours, January 17, 1979o PERFORATING July, 1979 Pressure tested tubing and inner annulus. Ran temperature sur~y~ frQm 4500' BKB to T.D. Perforated the following intervals at 4 spf using 4" carrfar 10685' -10704' BKB (Ref BHCS/GR, 1/10/79)./~,-, '~ 10714 ' - 10734' BKB ( " ) "' .. 10744' - 10822' BKB ( " ) &~,., ~ The well was flowed to the gathering center for clean up. Ran s%aLic pressure and t~perature survey at 8800' TVDss. Set and tested insert sleeve and SSSV in ball valve nipple. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION July 30, 1979 Alaska Oil & Gas Conservation Cc~mission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. Hamilton Gentlemen: Wells B-13 ~4-36-11-13), Q-5 (31-15-11-13) ~""~¢~~d Q-7 (12-14-11-13) Enclosed, in duplicate, are Fom10-403, Sundry Notices and Reports on Wells, for the above-namedwells; and Fom 10-404, Monthly Reportof Drilling and WorkoverOperationS.for the month of July for these wells. GJP:MS: ja Enclosures cc: A. E. Leske M. J. Smith Drilling Well Files' Yours very truly, SOHIO PETROI~J3MCOMPANY G. J. Plisga District Field Engineer Form 10-403 '~-~" Submit "Intentions" in Triplicate .... · REV. 1-10~73 & "Subsequent Reports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT-~' for such proposals.) 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME ~' O,L F~ GAS E~] WELLIz~I WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Company Division of Sohio Natural Resources COmpany. 3. ADDRESS OF OPERATOR Pouuch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL At surface 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 64.16' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-13 (44-36-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool' 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 )orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF [~ REPAI RING WELL FRACTURE TREATMENT~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE.' Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. The following intervals, in this-well were perforated for production using 4" DML XXIII guns @ 4 SPF. A t~ature survey was- conducted prior to perforating. 10,685 - 10,704 ft. BKB (Ref. BHCS/GR 1-10-79) 10,714 - 10,734 ft, BKB (: '" " '" ) 10,744 - 10,822 ft. BKB~ (i '" "' " ) After completing perforating operations a static bottom hole pressure was recorded a~d a SS~SV was run in the nipple Ca 2000" BKB' and tested. This work was completed during July-1979, 16. I hereby certify that the foregoing is true and correct TITLE District Field Enqineer DATE (This sDace for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side Form 1~o. 10404 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WELL WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Company A Division of Sohio Natural Resources Company 5. AP! NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN'ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit West 3. ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, AK 99502 B-13 (44-36-11-13) 4. LOCATION OF WELL 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. July 10, 1979 July 13/14, 1979 July 27, 1979 July 28, 1979 Pressure tested tubing and inner annulus. Ran temperature survey-from4500 ft. BKB to T.D. Perforated the following intervals@ 4 s.p.f, using 4" carrier guns. 10,685 -10,704 ft. BKB (Ref. BHCS/GR 1-10-79) 10,714 ~ 10,734 ft. BKB (" " " ) 10,744 -~ 10,822 ft. BKB (" " " ) The well was flowed to the GC for clean up. Ran static pressure/temperature survey @ 8800' TVDss. Set and tested insert sleeve and SSSV in ball valve nipple. 14. I hereby ~a: t~,~.egoing is true and correct ~ be S,GNED, ,,'",.~,~nnm ~ r "'C DI:._ TITLE D!.strict Field Engineer DATE. 7 ~) NOTE-Report on this' form is required for each calendar month, re§ardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION June 13, 1979 Alaska Oil and Gas Conservation Ccmm~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: 'Mr. Hoyle H. Hamilton Chairman 3111 "C"STREET ,~. / P~i~.':., ..... 77,--' ANCHORAGE, ALASK %- '- 1 TELEPHONE (907) 265-£ 9001 ._ MAIL: POUCH 6-61;~ I '~' ANCHORAGE, ALASKA .)'~)502 ' Well B-13 (43-36-11-13) Gentlemen: Due to a faulty inclinometer, the original Gyroscopic Directional Survey was in error and the vertical depths reported are not correct. An amended FormP-7 and corrected Gyroscopic Directional Survey are attached. Very truly yours, Enclosures SOHIO PETROIA-ll~ COMPANY District Drilling,. ,Engineer Form SUBMIT IN DUP., E* STATE OF ALASKA (See other structlons on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: OIL GAS I---] WELL~ WELLI I DRY r-] Other b. TYPE OF COMPLETION: NEW WORK ~ DEEP-i--I PLUG I---] DIFF. r-q WELL[~ OVER I I EN I I BACKI I RESER.I I Other 2. NAME OF OPERATOR Sohio Petroleum Company, 3. ADDRESS OF OPERATOR Div. of Sohio Natural ResOUrces Co. 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. Well B-13 (43-36-11-13) '10. FIELD AND POOL, OR WILDCAT Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM At top prod. interval reported below f_z)p Sag R. SST. At total depth 780' WEL, 1426' NSL, Sec. 36, TllN, R13E, UPM 1157' ,W~L, 1355' NS.L, Sec. 36, TllN, R13E, UPM Prudhoe Bay, Prudhoe Oil 11. SEC., T., R., M., (BOTTOM HOLE Pool OBJECTIVE) Sec. 36, TllN, R13E, UPM 2. PERMIT NO. 7R-R3 l1032'MD 9114'TVD Jt0989'MD 9074'TVD ] None ~ta1 - :~ '''? ~[/' ['' c 22. PRODUCING INTERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* 3. WAS DIRECTIONAL · ;,}~; i "i ~;;:} ~:'ii%?~ / SURVEY MADE / None ~ Yes 24. TYPE ELECTRIC AND OTHER LOGS RUN 25. CASING SIZE 20" x 30" 13 3/8" 9 5./8" 7" 26. DIL/SP/GR, BHCS/GR CASING RECORD (Report all strings set in well) Insulated C~nductgr 110' 36" 72~ ] n-80J 2686' 17~" 47~ / L-80/ 10387 ' 12%" 290 I L-80 19844-:L1032' I 8~" I LINER RECORD CEMENTING RECORD AMOUNT PULLED 454 cu. ft. Permafrost 5766 cu. ft. Permafrost 1062 cu.ft. Class G: 36 517 cu.ft. Class G ½ cuff. Perm. C · TUBING RECORD SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD) 27. 11 9864' (Interval, size and number) PRODI 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED JCTION 28. PERFORATIONS OPEN TO PRODUCTION 30. DATE FIRST PRODUCTION DATE OF TEST. HOURS TESTEDIICHOKE SIZE I PROD'N FOR TEST PERIOD FLOWTUBING CASING PRESSURE ,CALCULATED OIL--BBL. PRESS. 124-HOURRATE I~ 31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc.) PRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) OIL--BBL. GAS-MCF. I I I GAS--MCF. WATER-BBL. I I TEST WELL STATUS (Producing or shut-in) WATER--BBL. JGAS-OIL RATIO lOlL GRAVITY-APl (CORR.) 32. LIST OF ATTACHMENTS Directional Surveys 33, I hereby certify t hat t h~/~ a..ttach_e~nfor_7 is co~nplete and correct as determined from all available records. SIGNED ~ ~':~'~r'''~~F'%'"''"-'~ TITLE District Drilling Enqineer P.'R. ~fdd ' ' - WITNESSED BY *(See instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement": Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME MEAS. DEPTH TRUE VERT. DEPT BKB Subsea Sag R. SST. 10475' 8646' Shublik 10508 ' 8670 ' Ivishak 10604 ' 8739 ' ~"~ 36. CORE DATA, ATTACH BR~EF DEscR~PT,ONS OF L~THOLOS¥, POROS,TY, FRACTURES, ^PPARENT D~PS AND DETECTED SHOWS OF O~U, GAS OS WATER. Form 10-403 Submit '41 ntentions" in Triplicate REV. 1-10-,73 & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals,) 5, APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 2. NAME OF OPERATOR Sohio Petroleum CQmpany Division of Sohio Na~ur~] R~so~.~_s C. omma~v 3. ADDRESS OF OPERATOR Pouch 6-612, Anchoraget Alaska 99502 4. LOCATION OF WELL At surface 1740' SNL, 1608' WEL, Sec. 31, TllN, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 64.16' AMSL CheCk Appropriate Box To Indicate Nature of Notice, Re 14. 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-13 (44-36-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 3orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~] PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT Of: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals in this well will be perforated for production usincf 4" DML XXIII guns @ 4 SPF. A temperature survey will be conducted prior to perforating. Zone 4: !! !! 10,685- 10,704 Ft. BKB (Ref. BHCS/GR 1-10~79) 10,714 - 10,734 Ft. BKB ( " '" " ) 10,744 - 10,822 Ft. BKB ( " " " ) After completing perforating operations a static bottom hole pressure will be recorded and a SSSV will be run in the nipple Ca 2000' BKB and tested. This work is progr~ for June 1979. 16. I hereby true and correct SIGNED CONDITIONS Of-'~PROVAL, IF AN~'..~'' TITLE ~ .... DATE See Instructions On Reverse Side SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION - - ~T-~'----i--1 ,~" b! ":_~,_(~ 3111 "C" STRE ,-T ' 2 [':t~'.~, ANCHORAGE, ALV~SI<',A [~ .:,, : TELEPHONE (907)~ '~2~5-~00'~ r'r'.j % ANCHORAGE, ALASI~A'Op~2) ;'OL CO~ID~~ oTAT i-cb~F~~ ..... Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attenffion: Mr. H. H. Hamilton Gentlemen: Attached in triplicate are Sundry Notices and Reports on Wells, Form 10-403, for the following wells: Q-1 (24-09-11-13) Q-2 (32-16=11-13) Q-3 (11-15.11-13) Q-4 (43-09'11-13) Q-5 (31-15-11-13) Q-6 (43-10-11-13) B-9 (31-06-10-14) B-10 (11-05-10-14) B-11 (11-06-10-14) B~~( 43-31-11-14 ) ~44-36-11-13) GJP:ja Attachments cc: Well File ~17 - Drilling P.E. Well Files Dev. Eng. Yours very truly, SOHIO PETROIAJJM COMPANY District Field Engineer ,-. . ,t~;~,,.,! % .Il .. · ~i~ 1~ .... SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99504 3111 "C" STREET ANCHORAGE, ALASK TELEPHONE (907) 265-(; MAI L: POUCH ANCHORAGE, ALASKA State March 6, REFERENCE:Well Data Transmission The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 1 sepia and 1 print for 'the foll'owing Sohio operated well: B-13 BHCS Run 1 2" DIL Run 1 2" Colette Trac~ Well Records RECEIVED DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State'of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99504 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 State March 6, 1979 REFERENCE:Well Data Transmission The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 1 sepia and 1 print for the following Sohio operated well: B-13 BHCS Run 1 2" DIL Run 1 2" Colette Track Well Records /, .. RECEIVED DATE 19 __ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: State of Alaska ~t of Natural Resource:: D~_sion of Oil & Gas ...... ~01 Porcupi.',:ic /~o~'age, Alaska ~'rl~N; MB, H. HAMt!.Tt~b: 3111 "C" STREET ANCHORAGE, ALASl TELEPHONE (907) 265- MAI L: POUCH 6-61 ANCHORAGE, ALASKA Unit/State/P& February 20, 5 ENG 1 GEOLI { 2.. GFC'L ' 195l~23 OF,: l. ., { RF\/ IFILE: REFERENCE: Well Data Transmission The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- ~a~qP_tic tapes for the 'fo'il'owing 'Sohio operated wells: J-5 #54600 OH 1-10-79 #54741 CH 11-24-78 Colette Trac~ - Well Records v J RECEIVE DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: State of Alaska February 16, 1979 Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, AK 99504 Attn: Mr. H. Hamilton REFERENCE: Well Data Transmission The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- · Well B-13 1 print and 1 sepia CNL Run 1 5" " " " " " D I L " " 5" " " " " " BHCS " " 5" R.' McGaff~a~ ' SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, AK 99504 attn: Mr. H. Hamilton 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAI L: POUCH 6-612 ANCHORAGE, ALASKA 99502 February 16, 1979 REFERENCE: Well Data Transmission The following material is being submitted herewith.PleaSe acknowledge receipt by signing a copy of this letter and returning it to this office:- Well 'B'-13 2 copies: Gyroscopic Multi. shot directional survey, BOSS-16351, January 31, 1979 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION MAIL: POUCH 6-61 ANCHORAGE, ALASKA 3111 "C" STREET ~---~---~ ANCHORAGE ALASKA ...... COF,~F~SR: FILE: Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Hoyle H. Hamilton Chairman Gentlemen: Well B-13 (44-36-11-13) Enclosed, in duplicate, is Fonn P-7, Completion Report for the aboVe-n~medwell, together with the Well. History, Well Logs, and Directional Survey. This well has been suspended pending perforating operations. PRJ: ja Enclosures cc: Well File ~17 Colette Tracy Very truly yours, SOHIO PETROLEUM COMPANY P. R. J District Drilling Engineer Form P--7 SUBMIT IN DUPL .... :TE* STATE OF ALASKA (See oth,~ in- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: ,,,-,- ~.-, ~,1~ LI~-- WELLL_J DRY [~] Other b. TYPE OF COMPLETION: NEW WORK DEEP-r--] PLUG ~ DIFF. WELL[~ OVER[--~ EN I I BACK.I I RESER.[---1 Other 2. NAME OF OPERATOR Sohio Petroleum Cc~npany, Div. of Sohio Natural Resources Company 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM At top prod. interva~ reported be~ow top_=.qa~ R. SST. At tota, depth 808' h~IL, 1340' NSL, Sec. 36, TllN, R13E, UPM 1185' WEL, 1270' NSL, Sec. 36, TllN, 13. DATE SPUDDED 114. DATET.D. REACHED 115. DATE COMP, SUSP, ORABAND. 12/7/78 ' I 1/10/79 J 1/17/79 11032'MD 9049'TVD J10989' MD 9017' None 22. PRODUCING INIERVAL(S), OF THIS COMPLETION - TOP, BOTTOM, NAME (MD & TVD)* None 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-13 (44-36-11-13) 0. FIELD AND POOL, OR WILDCAT Prudhoe Bayr Prudhoe Oil 11. SEC., T., R., M., (BOTTOM HOLE Pool OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. R13E, UPM 78-83 KBE = 64.16' AMSL 37.72' AMSL 21. ROTARY TOOLS INTERVALS DRILLED BY CABLE TOOLS 23. WAS DIRECTIONAL SURVEY MADE Yes 24. TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GR, BHCS/GR 25. CASING SIZE 20"x30" 13 3/8" 9 5/R" 7" 2~. WEIGHT, LBJFT. J GRADE J DEPTH SET (MD) j HOLE SIZE Insulated ~onduct~r 110' I 36" 724 I L-80/ 2686' 17%" 47~ J L-80 J 10387' 12~" 29~ JT,-80 19844-11o32'1 LINER RECORD 127. TOP (MD) BOTTOM (MD) SACKS CEMENT* CASING RECORD (Report all strings set in well) CEMENTING RECORD 454 cu.ft. Permafrost 5766 cu. ft. permafrost 1062 cu. ft. Class G: 365 I 517 cu.ft. Class G TUBING RECORD AMOUNT PULLED :u.ft. Perma. C SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD) 7" 9864' 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. SIZE 2B. PERFORATIONS OPEN TO PRODUCTION None (Interval, size and number) DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED PRODUCTION DATE FIRST PRODUCTION DATE OF TEST. HOURS TESTEDjJCHOKE SIZE J PROD'N FOR TEST PERIOD FLOWTUBING CASING PRESSURE ,CALCULATED OIL--BBL. PRESS. 124-HOUR RA~TE J- 31. DISPOSITION OF GAS (5old, used for fuel, vented, etc.) JPRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) J WELL STATUS (Producing or I shut-In) OIL--BBL. GAS--MCF. WATER--BBL. JGAS--OIL RATIO I I I I GAS--MCF. ~ 7~ ~WATER--BBL. JOILGRAVITY-API (CORR.) 32. LIST OF ATTACHMENTS Well History, Well Logs, Directional Surveys ~k:~i,~' ~ ,~., .... . 33. I hereby certify that the fore~l~"~d attached Information is co;'nplete and correct as determined from all a~!lable '~e'~rds. , . . SIGNED P. T~TLEDlStrict Drillinq Engineer _ *(See instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item' 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME MEAS. DEPTH TRUE VERT. DEPT BKB Subsea Sag R. 'SST. 10475' 8581' Shublik 10508 ' 8605' Ivishak 10604 ' 8673' 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. , Well B-13 (44-36-11-13) HISTORY Dec~, 1978 Spud well at 1600 hours, December 7, 1978. Drilled 17 1/2" hole to 2705'. Ran 70 jts. 13 3/8" 72# L-80 Buttress casing to 2686'. Cemented with 5766 cu. ft. Permafrost II cement. Cleaned out to 2716', performed formation competency test. Directionally drilled 12 1/4" hole to 10744'~, with lost circ%llation frcra 10527'. Stuck pipe at 2993' while POH.~ed off, washed over and recovered fish. Cleaning out. January, 1979 Cleaned out to 9864', left partial BHA in hole while POH. Fished and recovered. Reamed hole to 10387'. Ran 265 its. 9 5/8" 47~ L-80 Buttress casing to 10366'. Cemented in two stages: First stage %~ith 1062 cu. ft. Class G cement; second stage through D.V. at 2340' with 365 cu. ft. Perma- frost C cement. Arctic Packed 9 5/8" x 13 3/8" annulus. Cleaned out to 10321', tested casing to 3000 psi. Drilled out shoe, washed and reamed to 10744', drilled 8 1/2" hole to 11032' with partial ret%~nns. Ran open hole logs. Ran 29 jts. 7" 29~ L-8~X~Bu~ress liner to 11032' with top of PBR at 9844'. Cemented with 517 cu. ft. Class G cement. Cleaned out to 10989', tested liner to 3000 psi. Displaced well to CaC12. Ran 239 jts. 7" 26~ L-80 AB-IJ-4S tubing to PBR at 9844'. Displaced tubing to diesel, landed tubing with ball valve nipple at 2031'. Tested tubing to 3500 psi. Installed and tested wellhead, master valve and ~ab valve. Released rig at 0600 hours, January 17, 1979. d, A. Fouch~ President Hr. Gary Plisga Sohio-BP, }!a ska 3111 C Street Anchorage, AK 99503 1979 June 1!, ~~ Re: Our Boss G!~oscopic Su~mTey Job No. Boss-!6404 Well B-13 Prudhoe Bay Field North Slope, Alaska ..Date of Survey: Jmne 2~ 1979 2~ar ,l,~. P!isge: .... ,_~na~.~:._...0,_~*'~¢:. ~he ".n,,¢4g-;na!" an! s%%een (16) copies of our ~,~ ........... Gyroscopic H~iti. sl¢ot Di~,~ct~on~ S~ev_ on the above well. ~narP, you for giving us this oPl3ortmnity to ]De of sensei ce. Yeurs vei%~ tlm!y, COPPiJI',^ T t 0 k dUNE A, 1VTg EAT[ OF SUEVEY jur, JE 2, 1579 DATE ........ ,ROSS GYRGSCOPIC SURVFY dO[~ NUMP~LR BOSS-1G40A RUN NO. WELLY BUSHING ELEV, = Gq,lq FT. TP UE SUR-S E A COUP.SE £CUt~SE DOG-LEG ~f' A'~P E.D V'CR T I'C ~'L ............ VERTICAL INCLINATION ...... [IIRECTICN SEVERITY PFPlM DEPTH DEPIH BEG MIN DEGREES DEG/lOO 0 200 3O0 aGO r,C,0 I uO 1] DO lt, UO 1700 ]qUO 2lDO 2200 2qO0 2~.bO 27UU 1000 TOTAL RECTANGULAR C66RP~NAIES NURIH/SOUTH EA ST/..E S 1 VERTICAL SECTION 1 OD.CO 5%.86 200.00 135.~,6 300.00 q99 .~8 ~35, a ~ 699,97 635,H3 79q,gG 735.22 8~9.95 ~35.P, 1 ~g9.95 I 0n~.95 1 035. ~ 1199-95 1 135.~ ] 29q.95 1'~35 139q,9~ 1335.80 0 21 lt+99.gq ........... 1-q35.80 0 2~ 15~9, q~ 15=q 20 0 26 .. ~.) · 1999,93 1935,79 0 22 ............... 20~q,95 2035. 'rt~ 5 19 2199.52 2135,7~. O 26 2299.92 2235.7~ 0 3 Z399,91 2335.77 0 5 Pq9%.PO 2~t 35 . 7'.5 1 1 2,.599, ~6 2535.72 1 2 . 269m.83 26,Y5.6~ 1 2 2~9q, 16 ~8~ P~97.97 ..... 2q33,H3 0 ..... 0 .............. h ....... 0', 0 E .................... 0,00 .......................... 0',00 .......... O.O0 ............ ~S 15 S 9.1~ E .2'z., ,20 S .O~,., ,_r O I0 S 2.50 E .06 .Sq S .07 E 0 31 "-'S 8,10 W .36 ......................... 1.15 S '' ,01 E .......... 0 ~0 S 11.7~ W ..15 2,18 S ,17 W 0 q3 S 17.6U W ,09 3.3G 6 q2 S 25.50 ~ .10 4.52 S .9~ W 0 ~3 S 21,7m W .05 5.65 g l,/+q W O ~5 S 19,6~ W .gq 6.85 S 1.g9 W 0 =q,., S 18, 0 W ,17 7.95 S 2.27 W 1 0 22 S 29.19 W .23 8.71 S 2.58 W I 0 6 'k 25. 0 W .q~ ~.91 S 2.7a W ~ o ~2 N ~. o w .'~o ........................... s';'6'6 ...... S ...................... z,~z ..... w ............... I 0 20 N qO.7S W ,I~ 8,28 S N 6~.29 W .1~ ~7,'2 S N .... ~0.70 W .13 ~~65"-S ............................ 4,3G W ............. S -'c,.~.2q ~ .3~, 71 S S 35.G~ ~ 0.00 · 06 . . 1,10 1 - a9 2,20 3.7~ W 8.8a S 6.,.,.. ............. ~ ..... ~,~,~ ~ .os ~ ~ .............. s .... 3z,z"~ ~ .~'~'~'~0'.'(;~ 's ............. ~,?~'~ ................. s sz.~~, ~ .~~ ~.~o s ~,z7 7 S ~5,39 E ~3~ 13,z, 8 S 3,02 ~ 8,55 5 S ~1,69 E ~ 15,3q S 1,56 W 5 ...... S'51,50 W ........ ~9 17,17 S ....... 1,88'w ...... q,12 b S 7~..70 W ~50 1P.52 ,.~e 6.01 W 13.q',,. ] S ~7. O W q.68 21,27 S 15.72 W 23.F, 3 . 6 ............. S .... 6q.50 W ..................... 1,31 ...................... 28"i~ ......~ ................... 29',68 .... W 38.9b q.67 6.10 6.36 6.3~ 6.7a 7.2~ 7.92 8.65 q ~' C'H T ~?- P,P A L t~ ,S~ A Si~ERRY-SUN ~ [, LL !RV .F_Y lNG AN CFC;RAG, E, ALASKA .. COPPUT~TICk gAlE ,JUNE ~, 1.'~79 AGE gATE OF SURVEY ,JUNE 2, 1579 ROSS GYROSCOPIC SURVEY dob NUMBER 8eSS-1GqOq RUN NC,, ~ KELLY BUSHING ELEV. : 64,14 FT. ~'~F t" $ tlr ER V D[ I:" T t-~ T RUE SUH-SE ^ ERllCAL VERTICAL DEPTF OEFTH 319~.50 3130.5£, 5292.08 3227 33t{9.20 3525.06 3~5.~8 3421,qq 35H0.86 3516,72 3674.90 ~610. ,57&7 .H~, 3703,69 3859.07 379A.~' ...... 5g a 7. ~7 18P5.7 ~ U64.30 3970 · 16 4197 .iA 4.155.02 4z.f,.l, 7 42~2.G3 qqlq. A~ q~55 71 4aS3,49. aA29.'~.q aRg7.1~, '~503. O 1 ~64 O · 62 4576. a H q7HG.47 ~722.33 485c:.sq 4795.70 ~q 34 · 06 fl869. ~2 50 O ~. 55 qq44.41 50H2.27 5018.73 51556.71 50n2.57 522q.61 ............ 51¢,5.47 5301.90 5237.76 537~,01 53C) 9,27 5445,51 COURSE COURS[ FlOG-LEG INCLINATI. C;N EIRECTICN SEVERITY DEG M I lr"J DEGREES DEG/1 O0 1. 0 1" 14 25 ] G 25 1H 51 ,,O 51 2.2 25 4.9 ,.?~ 53 31 28 ~5 7 .... · 7'9 55 ~2 42 = 3 42 31 42 28 42 57 43 13 a'~ 17 a2 41 4 t~ 65.2~ G2.39 61 · 39 62,3? 63.39 S 64.1q S 63 · 7 S 61-7g S 61 · S A2,27 ' S 62.3° S 60 · A9 S gO.2q S 60.1~ S 60. S 60 · 3~ ~ 60. 0 S 59.50 S 59.6~ S 60.29 S 60.50 S 60 · 50 1.. ............... S 6 c · a9 2 S ~1 · 39 ~ S 61,1~ 4~ S A1,5~ 40 S 61.19 2 S 61.50 ~9 S 61.19 q2 ~ 61.19 TOTAL .... R£C. TANGULAR COORDINATES ..... NORIH/SOUTH EAST/WEST VERTICAl_ SEC T I oN 1,70 4'..,,R9. S 63,09 W 75. 1,14 ...................... 53,55 ..... S ...................... 82,72 .W 97, ) 1,32 64.77 S 105.71 ~ 121 ....... 2.03 77.28 S 127,18 W 14g. O~ ............ 2 ..4...A ..................... ? ~. O 7 $ ........................ 1.5.4.1.5 ..... 2.02 1GG.0A $ laA.62 N 212.32 1,63 122.23 S 217.79 W 2Aq,23 3.A6 t./*[,.96 S 25q,15 ~ 290.11 3.06 162.72 S 294.62 W J6.02 2,61~_ 186.31 S 339,02 W 386.25 4.9~~ 240.73 S 441,21 W 501.95 2. 273.05 S, q98.5q W 567.59 ~,Of,.G1 S 557,1~ W 634.q4 3~0,16 S 615.8~ ,.=.7=.:.58 S 674.67 W 769.8H qOT.~ 9 S 735,36 W 837.33 aal.$G S 791.95 9 q75.93 S R50.88 W 973,~ 2 510.20 S 910.22 W 1.041.35 .00 243,76 S 969,30 W 1109.13 .47 576.76 S 1027,63 W 1175.99 ................ · 27 609,41 S 10 HS...H I__.W ................ 1.2~2.57 · 4g 1144.42 W 1 309..5~ .54 1203.56 W 1376.71 6~1.69 S 674.08 S W ............1.09 .................. 70G.59 .... S ............. 12.63..63 .... W .................. 1445.0F, W .21 7q0.02 S 1~2q.26 W 151..06 W .42 773.2~ S 1385,07 W 1583.25 w ......... .6 ~ ........... ~,O ~ · Z 6 .... S .......... 1 A ~ 6. A,~ _._.u ................... i G s 3. o ,; W ,0~ 8q0,63 S 1508,03 W 1723,26 CO~PaKY [:ATE OF SURVEY dUNE 2. lg79 i.:USS 6YR LSCOPi C SURVEY dob NLJM~ ER KELLY BtISHIN~ [LEV. = 64.1~ 3 F l · r," [' /~ FI!PLD F)[ P T H ~ ~i b 0 5727.13 5662 · 5 r.~, 0 D 5 79 6 · E2 5 732.3 (.[~ 0 0 5865,32 5H01. ~,7 ~ 0 59 '3 ~. A7 5~ q. 33 ~:,P gO [,gO1.2g 5937. n'.,~u 0 fiO6~J, 3 D 6005, 7000 R 137. [~5 6 073.5 ......... 'f 1 U U 62 0 &, q ~. 61 q2- 7;7 ~ O ~-.P 75 · q6 6211. 7~ [: ~ 6~ 16 · 39 6352. 7r,,S U g4H 7,36 6423, ........... '77 n 0 66 ] 2.09 6567. '~' ~ O 6705 · Rg 664 I · '/'~ () 0 6'1 H 0 · 37 A 716. ............. Fo TM O 0 I 0 ~ q · q. 6 7 020 · P40 O 7162,81 70qP. · 'T,O 0 724 ti, 9H 7 I ~,. .. F~60C '13, 1 q,'P2 ............ 7'/' 5, b. ~:, ~; P~ 0 U 74 H O · q6 7 q I &. g5~2 O 7561 .'0 O 7 ~')q. q(;OO 7~]. 03 7576. ~t00 I720.85 7(,~6.71 g20 O .1'8 [] D.2 0 ............ 7 736. TOTAL r~LC~AKGULAR COORDINATES i',iO k Ttt/S OUTH £A ST/WEST VERTICAL SECTIC)N 17 17 58 27 S"61.39 U-': ........................... .Sn ........................ 87~.58"'"'~ ............... 1'5"76'~"6q ...... W ......................... 1.7~3. R5 61. O U .58 90~,95 S 1652.56 W 1865.'~ 60.~g W .15 5A3.82 S 1695.20 U 1936. ) 6~.69 W .50 979.00 S 1758.02 W 2008.51 60,50 W .49 i01~,63 S 1821,25 W 2080,93 6~.2u W .55 1050,77 $ 1894,88 W 2153,93 60, 0 W ,22 1687,35 S 19fl8,62 W 2227.22 59,39 W .56 112A,33 S 2011,91 W 2300,28 59,29 ~a .19 1161,55 S 207q,71 W 2372.9q 59.29 W .5~ 1198,58 S 2i37,08 W 2qq5,25 59,10 W .45 1235,91 S 2198,86 '~ 2516,88 59.10 u .32 1272,11 S 2260,19 N 2588,05 .................................... S 5~.~g ~ ,¢.'~':¢ ~,.30~'~"~ ""~4'-"S .............. 2320 ,"98--~ ............. 265H ,66 5g.'l~ W '20~~ 1345,09 g 23H1,'28 W 2728,7g :q.,. · lg. W I . 1&A0,93 S 2qqO · q3 W 27q8,08 ..... 59.19 '~ 1415.'~6'-S ................. 2qqg.'lO- W ................. 2866,22 59.'1'~ w lq50.21 S 2557,83 W 2~33,q4 5'~ 8~ 'g 1~'.,TM 7~ S 2615-r'~ W 209~ 5~.7g W 151~.90 S 26'72.6~ W 3065 . b 5u.75. W 1'=4~., .70S 27~ .01 N 60 29 W 1581,P, 8 S 278~ ~5 N 31.~.9~ 61. O-,d 16~3.'01 .... S .......... 28qO,21"'N .............. 3258 61.19 N 7 16~$.3q S 2895.15 W 3321.I1 61,30 W .25 1673,30 S 2949,86 Y 3383,/~0 62.19 62.89 53.79 6q.10 ....... 1.0 7 ............ f'?'G ~'"'"'b 5"--~ ........ 30'0'3','97-~ .................... 344 1.lq 1730.73 S '3056.96 W 35(IA.P,O .AG 1757.9e, S 3109.ql W 35~3.H7 ' 51 ................... l"? P, A',"~ o "'s ............... ~ 1 G 2 '21'% ............ · 60 1~.11.50 S 5215.95 65,1'0 W .................. 1'.'1~ .............. leg's:los' s ............. 3~'2'5 '03 ..... SPERRY-~U[~i CFLL -(~IRVEYiNG /~rqcIr~O! ..... "(:)[':,, ALA'-;'KA F'GF'i:',UT47]OI',,. OATF. ,lUbE q~ 15' 79 COMP P A G E bATE OF SURVEY FOSS GYRCSCOFiC UOR NUMBER DC.~SS-16~Gzt KELLY ~USHING ELEV. : 8q.lq F 1 ,, T R lit:_ SUB-"[ A ~[ ~.~: I/~ [, b VLRT]CAL VERI'ICAL r', r' P T ~. ~ ['! [. P 1 t4 D F' P T lq 781 ]. 7961,14 8U33. la 810A.2u ,q I 73,57 ............... n310.2g g379,6~ 8552.11 86~.2q 8'736.1 ~ 8808.2~ 8881.33 89~1.9~ 90a9.95 ...... TOTAL kECI'ANGULAR CO{]RDINATFS VERTICAL NOR 1H/SOUTH EA..CT/Nc~,oc-r SECT I ON a,i] ,~..; S 6,5.60 W 2.70 q3 .... 5r,, S 67,69 W 1.,qq qq. 1~., $ 70.79 W 2.2~ qq 6 S 73.10 W 1.84 z, 7 12 S 75.7F W 2.86 47 2q S 76.1[~ W z~5 30 S 77.c"'0 W 2.07 ~G 35 S 77.20 w 1.i0 ............... A3 q7 ,S 7~.20 W 2 ....... W 1..25 "' 7 35 79.20 W /~q 2 S 7~.73 W -35 ~['~3,8 45 5~) S 78.39 W iq9 ~lq~ 12 q2 32 S 75.50 ~ 1 29 157 21 ~=., 5~,, S 80.20 ~ 1.55 7.*._O ~3 33 S ~0.20 W 0.00 HOkIZOh~TAL DIFPI. ACEPENT = 5051.56 FEET AT SOtJTH, Gq DEG 1~'[7 CALCLL/~fIOh pRCCE'CuRES /~f.!E L!ASL.[? ON THE USE OF"THliE. E OI 1~17.6~., ., .S 3~q3.2".~ W 3q33.~I igq4.q4 $ 3506.11 W q002. 196~.9S~ S 3570.94 W ~D71.27 1950.76 S 5637.77 W 2C10,06 S 3707.2q ~ q211.93 2027.91 S 3778,5q W 4223.93 20qa.65 S 3849.05 W ~35~.74 2U6¢3.gO S 3919.25 W 2CTS.55 S 3989.6~ W ~q95.2q 2091.48 S fl052.~7 W 4565.~2 2i34.55 S ~12&.33 ~g 4630.66 S /~262.66 W 476q.75 S 4~0.53 W 4g31 S qZ, 97.55 W a297.97 S 4453.32 W ~952 .SR 4.67 S A554.50 W 5051.56 N. ~EST AT MD = 11052 AL' RADIUS ..... OF'CURVATURE 'METHOD. * FrOht linear extrapolation k~low dee, pest station. ANCHOEAGE, ALASKA ~ l Af ~'A COKP A h¥ ~ PAGL DATE OF SLIRVEY jUNE 2, 1979 CU[viPUTATIOi"~ D,~TE ,,iUNF ,'.,~, 1~..i,'9 ,JO[:, NUMF~ER [~,0SS-16404 RUN NO. FT. INiLEPOLATEF) VALUES FCR EVEN IOOG FEEl OF' ,"~LASi, iRLD D[::PT'H ATE:~', :, WI-, ST RIFFLFLNCL VE F<TICSL CORi~C CT~iO'N .0~2 .05 .~'/ 2.U5 I .96 52.15 · 0 50 2,-0.35 234.22 ~'~ ~.4.. 49 268.14 ~[',2,35 307,80 1144.54 282 i 3~"~. '~7 21.~ 9~,5.~ 283.4 9 1 1917~' 8.81 '~[.F CAt. CULATIOK PROCEDURES ARE [!ASED ON THE USE OF THkEE gIFENSI ",ADIUS OF CURVAI'URE METHOD. · ,5 RUN NO [.-,q. ] q VEiR T t C A L VEP, T I C f~ L D [' P l' tl ~ [ P i t., V~LbE,~ FOR DEPTH ~'0 -TVD Di FF EP, L NC E VERTICAL CORRECTION .bu .00 · OO .O0 .00 .00 ............................................ .gl .00 .o1, .O1 · 02 .0I · OZ .01 .Oq .O1 .05 .01 .05 .00 .O ...... .C,O .......................... · 05 .00 · b5 .00 SF'ER~Y., -,::~':'UN ~ELL ,','" L,,,V F Y ][r,~, 0", ANCHORAGE,, AL.ASK& CC, NP,ANY COMPU'FATInN DA TE [;A'fE OF SURVEY ,JUf~:F. 2, ,,j£,r,~ NU~P. ER [?OSS-1G4Oq KFLLY f. lUSi.lh'O FLEV. 1 $7t¢ 1KTERPCLATED V/~LCES FOF, I P. 64. lq 18OD. O0 I'~6A. lq 206~. lq 2 UUO. 0 g P16~. l.~, 2lO0.O0 22&¢4. lq 2200.00 23¢,n .1.~ 2500,00 2SG~. 1,~ 2500.00 P66q.l~+ 2600.00 ; i6q,la 2700.u0 2~6~.i a ............ 2t~Og n L R F' C T/1 NCRTH f'i G I5 L / S 0 u I 10.53 11 .al I 1.52 14 20.20 25.76 '3,05 ,.7 qi .15 50.5 3 7,,. 35 104.26 EVEN iOG FEE1. OF SU[.~-SEA DEFTH S 2q.60 W 1 5'7 1.01 · ,~ --- ' 1 .~+3 S 5'/,lA W q 80~~ ............................... 1.81 .......... · :', 76.a5 ~: '7.1 2.38 S I49.05 w I q,G9 S 180.93 W 6.15 OUt'JE 4,, Iq"/9 CGVP Pr', Y L!A1E OF SURV['.Y dUN[;. 2,, uor', NUXf-~ER !-~OS5-1t?A04 KELLY BUSHING ELEV. : ~ U N N 0 . 6q-l~ Fl'. 6[] ~ al St,, ~" 2 O q ':6 I [' 6167 l'r4 UE V [ R 'I t [ A L S [J El - S [' A V E r~l' I C A L ~ E P 7 ~..! VALUES FOR EVEN 160 FEET OF SI, IB-°[4. o DiiF'TH ] q2. i4 ? 2[.,6.3q lGr7.ql S ~q2.g2 195 03 e 55,% A= 26b.%0 S ~ qI.97 ~ia.~,_, S 571.q~ 36(1.25 S 6F'i. 17 /,(¢5. Xl S 730.97 a[52.4fl S 81 0.82 '". ~ t,. (,~*S 972.7i f. 9 [; · 02 q 1051,66 63:5.b8 S 1129.5q g77.37 ,.," 120q,~6,. 75) 2,,..[,6 or l~q2"' 64 '/f, fi.(,~ S t37g.68 ~15,62 ,> ~' 1462,5q ,.'~'i .87 7.5° 41.51 '/1,11 ]G,62 c3.4 q 22.34 2~ .65 31 .2O t~-0.26 55 ~ o .7 1 2{.B , g O 3G ,22 ...................................... 3Ob, i 7 37.1 7 dUN[: q~ tg'tq C 0 M P A N Y [';AIL OF SL.iRVF. Y Jt!.NF 2, ,JO[3 I',~UHF![R F!,OSS-1&AUq KELLY BLJSi-~ING FLE¥. = RUN NO, 64.14 tkT[l:!t':~(';LA'[E[i V;~,LtJES FUR EVEt.,~ t. O8 FEF.'T CIF' SU2-SEA bLP'l'tl [,: [ C -1' A N G U L A t; C fL:, 0 i:< [.~ [ N ,'.~ T [: S P {3 - T V b NO RTH/S OUt H [{ A c' '~ / ~ E ST,.:, , D I F F EF:E. NCL VFrITICAL CORRECT lO N 6 l~.5. t, 2 42,6:3 (.', ~9 · 02 ..... 43*50 '734,1,~ 45.13 'If 1.0% 46.94 t~ 74 .'j, [ q6,25 iu(':,S.2L 41,33 i J47.7'2 39.5Z, I C 7'.,, Lq ........................... 36,81 1..i I 4. i. '~ o"/4 .5 q t ~ z~ 7. o-~ ~:.. ,3 3.2 3. C C F P A .~ Y PAGE 10 b/~lE. OF SURVEY dUNE 2, 19'I9 OB k,'UF.B[[R BOS KELLY BUSHING "t A ~[:i:t..) ViTFiTICAL VEP-I ICAL 'IH[ kf:,.Akf ST 2i] FO0 [ t'!P (t:i;~OF M,9-1V D DIFFERLNC~ VE RT lC AL CORRECT ION LINEAR INIEUnOLATION R/~I}IUS OF CURV4TUt~F) Fei 14[1,97 33.75 14a~.-59 37.6P I 52~. "lg q(J .1 q 1%7q , '1 fi q/~ 1. 7 ('8.57 q 2,9 ti 17 ~t,. 7'1 38.~ 0 ~,.:.. 9 3R ,8 2 1 t-;2~. 4 I 38.82 I S(~1.2C 36,79 1917.91~ 18.98 T ¢I E F N NTS spe -sun P. O. Box 6207 Anchorage, AK 99502 .. d. A. Fouch~ President Mr. Gary Plisga Sohio-BP, Alaska 3111 C. Street 'Anchorage, AK 99503 Re: Our Boss Qyrosc~pic Survey COpk Job No. Boss 16336 Well B-13 Prudtz~ Bay Field North Slope, Alaska Date Of Survey: January 31, 1979 Dear Mr. Plisga: Please find enclosed the " "Original'' and sixteen (16) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Yours very trtLly, SPERRY-SUN, INC. Doug Walker Survey Engineer II UW/kc EnClosures ~ ANC HO RAG A L ........... .E.PH!..O BP ALASKA PRO DUCT I_ON__DJVIS ION 'OF SURVE'Y: JANtl B-13 COMPUTATION DaTE BOSS GYROSCOPIC SURVEY FPUDHOE BAY FIE'BR{J/~RY Ge 1979 dOB NUMBER BOSS-16351 __ALASKA . KELLY BUSHING ELEV, : Gq.16 FT, . ~ PEASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL ' DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/1DO NORTH/SOUTH EAST/WEST SECTION 2 00 0 300 300,00 235,8q 0 26 S 1,89 E .2q 1,17 S ,~ E ,lz fiD0 399,99 335,83 O 28 S 5.89 E ,Oq 1,98 S ,50 [ ,~3 500 ~99,99 ~35.83 0 3q S 10,89 900 899.96 835.~0 0 3R S 18.89 W .lq 6.95 S 1,q5 W q.3R lOOO 999.96 935,80 0 22 $ 10.39 W .29 7,80 S 1,69'~/ q,98 1100 1099,96 1035,80 0 q 'N 37,70 E. ,43 R,07 S 1,71 W 5.12 1500 lq99,95 1435.79 0 23 N 6q.F{9 l,t 16 6,72 1600 1599,95 1535,79 0 26 S 69.10 td 6.71 1700 1699,95 1635.79 0 28 S 50,2q W 7,11 0 180 190 200 2100 2099,9q 2035.72 0 16 S 52,69 ,23 9,5q S 2200 2199,93 2135,77 0 29 S q3,6' &-..;~ ,23 9,99 S 2300 2299.93 2235.77 0 ~3 $ 55 ,26 1~,66 S 2500 2600 2599'87 :" ~2535.71 2700 2699,8~ 2635.6.R 1 12 S 39, 0 W 2750 27q9.83 2625,67 1 q6 S 62,60 W 2800 2799.77 2739.61 3 33 S 79,70 W .2785'~5 5 11 S: 76-20 W .. · . 2,55 W 5,2 7 3,22 W 5,87 3.89 W 6,65 .-...,,-... q,.59 W 8,35 4,11 W 8,12 3,29 W 7,68 1.5q 16,19 $ .99 E 1.66 16.96 $ .04 id 3,86 1'7.59 S 2,25 W · ' 18.~1 ~,~ · -98 W 6.8q 5.99 5.qG 6.31 7.57 9.83 13,5..3 5OHIO BP AL~$K'A P E'13 COMPUTATION P~,UDHOE BAY FEBRUARY Ge AGE 2 DATE BOSS GYROSCOPIC SURVEY 1979 dOB NUMBER BOSS-16351 19 11-979 ALASKA KELLY BUSHING ELEV. = GQolG FT. EEPTH DEPTH DEPTH DEG MIN DEGREES BEG/lO0 NORTH/SOUTH EAST/WEST SECTION 3O5 310 I~50 ~613 370 0 0 o ' 30q. 7.ql 298:5.25 9 55 S 63.50 I,/ 30.30 S 3096.6~ r 3032.z)7 10 19 S 6z~.29 W 3Q.17 S 31~+5.77 3081,61 11 3 S~65,P9 W ~8,11 S 22 32 53 1-Oq 32.66 g fl2.73 · 85 q0,55 W 51.51 1.51 qB,gq W. 60,7R 57 17 26 S 61.10 W S 61,39 Id S 62,79 ~ 1,39 62..,85 S 2,16 75,66 S 0 89,.88 S 98,57 Id lq8'85 W S G1.19 S 61,39 S 61.89 0 3389.50 3325.3q 0 3q, 85.86 0 3581.10 ,3516.9q I8 0 0 0 ~000 39Q8,26 388~.10 28 q05O 3991.72 3927,56 30 A!_QO qO3q,6A 3970.q8 31 '26 162.31 S 28B,Sq .W 67 'lTA. 17 S 310-22 36 186.35 S 332-80 'q30 0 ~158'57:~ ~Ogq,41 · '' 0 4197.65 q133,q9 3g AG S GO. q,97 2ql,62 S 0 4235,60 ~lTl.q~ ql 28 S 59 3,~6 257.97 S 0 q272,7~ q208,SR ~2 35 S 59 W 2.2q 27~,9q S ~+~+92. g2 Az}2R.76 ~+2 52 A~:500 q700 qSO0 q566,25 q502.0g ~2 q? S 58,69 W ,35 qlq,.39 S qgO0 /+639,27 q575,11 q3 22 S 58,29 W ,6~ ~50,09 S 5000 q711,79 qGq7.63 /+3 39 S 58.3q g ,29 486,22 S q78~o0~ · .. 5100 ~,62,39 W q91,2q %~ ~.,:70,81: 12,55 116,23 1~2.R6 173.2R !'2:q.'q' 05 330.61 W 355,31 ~ 35 · 73 528.~6 562.25 697,65 72q,qg W 833.16 7R2.73 W 901,20 l:)ql.35 W 96.q.77 _ *~0 ::':. 1038'-65- :i: .... CH E-13 PRUDHOE BAY COMPUTATION DATE FEBRUARY Ge 1979 ..... 1.979 BOSS SYROSCOP!C SURVEY JOB NUMBER BOSS-16351 3 ___ALAS__E~ .......... . KELLY BUSHING ELEV, = 64,16 FT, : :.: ' ' : :' ;::.::.::;:i;?'!;?::! :::' !!<":>:' "'!:i/'!<~ ;::::: '.:',";;?: MEASURED VERTICAL VERTICAL INCLINATION DIRECT'TON SEVERITY RECTANGULAR COORDINATES VERTICAL EEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IOO NORTH/SOUTH EAST/WEST SECTION , 5500 5077.83 5013.67 q? q6 S 59.89 W .51 661.17 S 1135,5q W 1309.2~ 5600 5151.,00 5086.8~, 43 113 S 59,60 V .46 695,52 S 1192'42 W 1377.28 99 ~q 27 S 59,69 W 1.27 730,~+9 S 1252,16 W 1m}4~6,34 6100 5506,q0 6200 5576,18 6300 5 ,20 6400 6500 6600 6700 6800 700 710 7_20 730 7qO 750 5916.q7 5982,94 6049,56 0 61t 0 61 t 0 0 6320.30 0 6389.28 0 6q58,79 5442.24 45 27 S 59,60 5512.02 /46 1 S 59,69 5581,0~ ~+6 ql ' S 59,60 5852.31 48 19' S 5R.7g 5918.7R qR 20 S 58,60 59 5. o 6 s .6o 6256.14 qG 4~ S 58,25 6325.12 q6 2 S 58, 6394,63 ~5 5~ S 57,8g 760 770 7; 790 ~00 820 6745.60 6681.~4 /-+3 6819.18 6755.02 42 6893.56 6829,40 A1 6968.60 . 6904 ,q 4: :i · 2 S 59.1q 11 S 59,10 ~+2 S 59.10 909.65 S 6 946.22 S O' 1096,51 S 15 1135.32 S 24 117~. 18 S · 18 1;528.28 S · 71 1366,~+3 S ,21 1~+04, 53 S · 32 1550.1q S .86 158A.87 S ,49 1619,19 S 1.495,73 W 1557.53 W I619,98 W lB 72,59 1936o42 2000.08 2250,95 W 2312 °49 W 2373.45 W 2611,125 2669.26 2726.61 -22 03 1728,06 1799.51 1871.70 17.19 :2090 · G 7 2164 2239 2313 238' 61 2534 2'606 2678. 2750, 21. ;2890, 2959. 3027. 3095, 3162. °78 .21 .50 o12 80 16 92 76 96 q7 10 53 W .. 322,q. O2 B-13 PRUDHOE BAY 1979 COMPUTATION DATE BOSS GYROSCOPIC SURVEY FEBRUARY 6, 1979 JOB NUMBER BOSS-16351 ALASKA FEASURED DEPTH · KELLY BUSHING ELEV. = 6q.16 FT. VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEPTH DEPTH DEG MIN DEGREES DEG/iOO NORTH/SOUTH EAST/%4EST SECTION ~600 7275,e9 7211,33 58 36 S 61.60 W 1.11 1778,15 S 3007,3~ W 3Q~Q,2O 8700 735q. ST 7290,21 37 13 S 62.19 W 1,A3 1807,10 S 5061,52 W 35~5,62 8800 7q3q,08 7369,92 37 q S 62,69 W ,.3q 1835,03 S 3115,06 W 3606,00 9200 77q9,92 7685.76 39 2 S 6q.,79 W 1,26 19qq,07 S 333~+,':)1 14 3851,40 9300 7826,15 7761.99 ql 36 S 65.60 14 2.62 1971.20 S 3393.65 %4 3916.08 °400 7899,7q 7835,58 q3 36 "S 66,10 W 2.03 1998,88 S 3~55,q2 W 39R3.TP 9'500 - 9600 9' 9800 9900 10000 10100 10200 10500 8179.60 82A6.06 8313.q6 1 1 .. 1 0~00 8591.15 0500 8662.95 OGOO 873q.60 0700 C800 0900 10950 8989.13 11032 90q8,71 ".:;. q053,,3~, ..4123.82 8115,qq q8 10 S 75 2.79 2093.89 S 372q,q~ W q266.gq 8181.90 q8 31 S 7 .70 2111.96 S 3796,9~ W q339,g2 82~9.30 *~ q~ S 1..~ 2129.20 S 386..7S . ~11.92 .'" ~55A~7 8526.99 q3 5~ W 1.01 2190.78 S qzAg.77 W q691.0'4 8598.77 q~ 17 79,20 W .AT 2203.53 S ~218.22 W q758.03 8670.qq AA 9 X~ 78.70 W .38 2216.90 S A286,67 W q825,29 892q,97 q3 2q S 80,89 W ,81 2261,25 S 4522°72 W 898q.55 q3 2q S 80,89 W 0,00 2270,14 S q578o55 W 958,08 5023.56 5056.47 5110,27 HORI; , ........ iR.ADXUS..OF,. CUR V ATURE NETHOD. i. SPERRY-SUN WE LE': ANCHO. RA . SCHIO BP ALASKA.PROD"OCTION:.DIVISION B-lX COMPUTATION DATE PRUDHOE BAY FEBRUARY G~ 197~ A~A PA-GE 5 :i97q ,JOB NUMBER BOSS-16351 KELLY BUSHING ELEV, = 6Q,1G FT, · ~o PEASURED £EPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD~'TVD VERTICAL 1000 2000 3000 ~+000 5000 600___0 7000 BO00 o, 000 10000 11000 11032 999,96 935.R0 7.80 S 1,69 ~t .Oq -0~, 1999.9~ 1935,78 9,08 26 61 S 2998.12 2933.96 · 6116,~5 6819.18 7592,77 9025' 6052,29 1212oR5 S 2_063,56 W 883,55 6755,02 158q,R7 S 2GG9,26 W 1180,82 7528,61 1890,1~ ~ 3223.59 W lq07,2~ 30 ~. -55 .02 319o7~' 297.26 226.~2 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF MENSIONAL RADIUS OF CURVATURE METHOD. S C H ! {3 fl P ALA$ i~!:i:i:!ii!i!iii iii~i:!i?ii-~i:i~i~i:!i~!il :.:i!i:i?'?:.:!:~A!'YE:. :!:: :bP: !;: SU.RV iE.~ .:.ii:.iU:.A'N.UA:.~'Y....~ le ],'e '/g ...... , ...... ....... ....:.,....:.,:,,........:..-.: ....... ...-. ,..,,.:...':...... ,..: . : :,:.::...:, ..... -,,...,., . ~.¥. -' :, .'.:.:. :.:,::,.,,,:.:.,,.:,.::..:,,:.:~,::,,.:,,..:..:,::,.::...:.:::..:::..... ,:,. ,:.::.;~.:~,....:. ,:...:.: .:...:...... :.:....,. ,.:.. ..... ;...: ......... ..... . .~,, ,~ ,. .... , . .. ~ B-13 COMPUTATION D~TE PRUDHOE BAY FEBRUARY 6,~ 1979 JOB NUMBER BOSS-16:~51 AL/~SKA KELLY BUSHING ELEV. = 64.16 FT. TRUE SUB-SEA TOTAL FEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD'TVD VERTICAL DEP T H :": ."'~ P:TH::!:i:!'!!?i!?ii~!! H:i;i'~:i?:ii;?.~'iN:D~i!H'!/!S:OU~!i!ill -: 6~ G~.lG O.O0 .05 S ,04 E ,00 ,DO 164 16A,16 100,00 264 264,16 200,00 66~ 66~,16 ' 600,00 76~ 76~.16 700,00 86~ 86~, 1.6 .. 1166 1264 1264,16 1200,00 1364 1.364,16 1300,00 146~+ 146q,16 1400,00 · 1564 ~ i56 ~-~.: 16...~:~::.: ~..:.... ?:.?..:..:1500 ' 4,30 S ,28 W ,02 5,36 ,<; ,78 ~/ ,.83 6.56 S 1,32 7.68 S ,OA 7.11 S .04 6.825 S , .05 ,00 o01 ,01 ,00 ,00 ,00 PRUDHOE . ALASKA SP£RRY'SUN COMPUTATION DATE BAY FEBRUARY Ge lq79 dOB NUMBER BOSS-16551 '~' P',~ G E 7 51, 1.979 KELLY BUSHING ELEV. : 6q.16 FT. · FEAS ~EPT 216~ 2264 TRUE SUB-SEA TOTAL URED VERTICAL VERTICAL RECTANGULAR COORDINATES MD'-TVD VERTICAL 196A 196A,16 1900.00 8,86 S A,91 W ,06 ,DO 206~ 206~,16 2000,DO 9.~ S 4,72 ~ ,06 216~,16 2100,00 9,77 S 4,32 W ,06 ,00 . L 256~ 256A,16 2500,00 13,55 S 266~ 2664,16 2G00,00 15.60 S 1,A6 E ,15 ,03 276~ 2764,16 27D0.00 17,16 § .~? W 18 ,,03 2864 2965 2900,.00 3067 *00 3168 316A,16 3100.00 3271 3264.16 3200.00 5573 3364,16 3300,00 3688 366{'I6 3690,00 35,30 W 39,63 S 52,24 4.59 1,75 4R,76 S 71,9 6.91 2,32 59 71 S 92, 9.68 2,77 ~-1~ COMPUTATION DATE FRLIDHOE DAY FEBRUARY Ge 1979 dOB NUMBER BOSS-16351 ~L~SKA KELLY BUSHING ELEV. = 6~.16 FT. TRUE SUB-SEA TOTAL ERTICAL VERTICAL RECTANGULAR COORDINATES MD;TVD VERTICAL .................................................................... 3905 ~86~,16 3RO0-O0 ],~1.~2 S 250,27 W ~1,.1.0 ' A660 qz+64o16 4400.00 q'797 ~564,16 4500,00 413,59 ~ 722,84 W 235*00 36,59 ~93~ q66~,16 ~600,00 ~62,45 S 802,7~ W 270,08 37.08 50.72 5209 5 5q81 5618 5757 3964,16 3900,00 166.54 S 296,25 W 54,0,1 12.92 16 65 ~06z+,16 4000,00 195.05 S 3/+9,08 W 70,66 · 365.66 S 6~3,31 W 196,61 36.25 5064,16 5000,00 65~,83 S 1122,60 W ' h 1 35,7'2 516zi,16 5100,00 701.77 S 1203,0R W 9 36,68 5264,16 5200,00 750,82 S . 12RG,Sg g 39,40 5897 :-.'::::536 60.39 '5~64 ., l.'B, 52 B-13 P~'UDHOE COMPUTATION DATE FEBRUARY 6,~ 1979 1.979 BAY dOB NUMBER BOSS-16351 ALASKA KELLY BUSHING ELEV. : 6q.16 FT. ' ' .~, :, ..'<. , . ,::.> '.'-..".::..- .. ' ,.' ,, ' :.''' '.: .-... ,-: . - · : ,,-.......:. :.~.-..._. ,.,-... ........ .,.,i .., ~... .... ... ,, . ....... , . - ' - · TRUE SUB-SE~ VERTICAL VERTICAL MEASURED 6~73 576q.16 5700.00 1010.72 6621, 586~+, 1.6 5800,00 IOGG,Q6 6771 596~+. 16 5900,00 112~.~2 TOTAL RECTANGULAR COORDINATES MD~-TV D VERTICAL S 1728. g~+ W 709.5~ q6o09 S 1B22.62 W 757.51 ~7,93 S 1.918, 3~ tm4 807,58 50.07 7363 7507 76q9 :7788 7.025 ¢,060 R325 8q56 636q.16 6300,00 6qGq,16 6qOO,O0 656A.16 6500.00 1352.67 S 2290.3 lqOT,q7 S 2~7 1~60.6q ~ 2~ U 8585 [~712 F)837 696q,16 6900,00 706q.16 7000.00 716qo16 7100,00 736q'.I6:- 7300'00. ' 7 ~ 6 q · 16.;:'>'~ '~" 7 600,00 1650.8~ S 19 W 1693, ~9 ~+.A8 W 173q. qO W L 1043.56 43,90 1 0~5.32 ~+1,76 12_29o95 33,q9 1261.63 31,68 12'91.96 30.33 P ~G~ ~ o SCH! 0 BP A KA B-13 COMPUTATION DATE PRUDHOE BAY FEBRUARY Gv 1979 ALASKA ) lv 1~g79 ,JOB NUMBER BOSS-16351 KELLY BUSHING ELEV. = 6q.16 FT. ~:!~i~'~,~i:?i:!~::~'~i!~ ~..::::~i,:,!!~:.:.:::::.. :::~ ..: ....:::-: '::~: ;:' '?: !i;:::' "" . TRUE SUB-SEA TOTAL ~EASLIRED VERTICAL VERTICAL RECTANGULAR COORDINATES F!D'TVD VERTICAL 9090 7664.16 7600.00 9218 776q,16 7700.00 86q,16 7800.00 97 9927 826~.16 8200,00 1007~ 8364,16 8300,00 10221 8q6q,16 R4OO,O0 10501 106ql 8 10778 886~.16 10915 8964,16 11032 9048.71 THE, CALCULA T:,! .............. THE NEARt 2116,78 S 3816,85 W 1663,18 50,38 P_lq-l,72 $ 3921,69 W 1710,21 A. 7,.03 2165,91 S 4026,84 W 1757.32 47.11 "0 0 8800.00 8900.00 8~8~+,55 2241,06 S 4fl07,5~ U 191~.,72 37,68 7257,q4 S q. q9 9.36 1951,4q 36,72 2770.1q S . 4578.3 1983,29 31,85 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION ..~A 3111 "C" STREET NCHORAGE, ALASKA ANCHORAGE, ALASKA ~9502 Alaska Oil and Gas Conservation Cc~mission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Hoyle H. Hamilton Chairman Gentlemen: Well B-13 (43-36-11-13) Enclosed, in duplicate, is Form P-4, Monthly R~port of Drilling and Workover Operations, for the ahove-n~ well for the month of January, 1979. PRJ: ja Enclosures cc: Well File #17 CC# 1997 Very truly yours, SOHIO PETROLEUM COMPANY P. R. Judd District Drilling Engineer Form No. 10'404 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME OIL ~] GAS WELL WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Company s. UNIT FARM OR LEASE NAME Division of Sohio Natural Resources Cc~pany Prudhoe Bay Unit 3. ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, Alaska 99502 B-13 (43-36-11-13) 4. LOCATION OF WELL At surface: 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. January, 1978 Cleaned out to 9864', left partial BHA in holewhile POH. Fished and recovered. Reamed hole to 10387'. Ran 265 jts. 9 5/8" 47# L-80 Buttress casing to 10366'. Cemented in two stages: First stage with 1062 cu.ft. Class G cement; second stage through D.V. at 2340' with 365 cu.ft. Perma- frost C cement. Arctic Packed 9 5/8" x 13 3/8" annulus. Cleaned out to 10321', tested casing to 3000 psi. Drilled out shoe, washed and reamed to 10744', drilled 8 1/2" hole to 11032' with partia! returns. Ran open hole logs. Pan 29 jts. 7" 29~ L-80 Buttress liner to 11032' with top of PBR at 9844'. Cemented with 517 cu.ft. Class G cement. Cleaned out to 10989', tested liner to 3000 psi. Displaced we!l to CaC!2. Ran 239 jts. 7" 26# L-80 AB-IJ-4S tubing to PBR at 9844'. Displaced tubing to diesel, landed tubing with ball valve nipple at 2031'. Tested tubing to 3500 psi. Installedand tested wellhead, master valve and swab valve. Released rig at 0600 hours, January 17, 1979. 14. I hereby certify that th~ SIGNED P .' x'X.~.d ~r~i.U - TITLE DisLrict Drlg. Engineer DATE NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed, SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION January 5, 1979 3111 "C" STRE ANCHORAGE, AL TELEPHONE (907) ANCHORAGE, ALA~ Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Hoyle H. Hamilton Chairman Gentlemen: Well B-13 (43-36-11-13) Enclosed, in duplicate, is Fonn P-4, MDnthly Report of Drilling and Workover Operations for the above-named well for the month of December, 1978. PRJ: ja Enclosures cc: Well File 917 Very truly yours, SOHIO PETROLEUM COMPANY P. R. Judd District Drilling Engineer CC# 1918 Form iX~o. 10404 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME OIL [] GAS WELL WELL OTItER 2. NAME OF OPERATOR Sohio Petroleum Company, Div. Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR Pouch 6-612, J~.choraqe, g_l. aska 99502 4. LOCATION OF WELL At surface: 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-13 (43-36-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool I 1. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES 1N HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. December 1978 Spud well at 1600 hours, December 7, 1978. Drilled 17 1/2" hole to 2705'. Ran 70 jts. 13 3/8" 72# L-80 Buttress casing to 2686'. C~aented with 5766 cu. ft. Permafrost II cement. Cleaned out to 2716', performed formation competency test. Directionally drilled 12 1/4" hole to 10744', with lost circulation from 10527'. Stuck pipe at 2993' while POH. Backed off, washed over and recovered fish. Cleaning out. 14. I hereby certi~~ is t~~rrect SIGNED ~ LF')(. . ~ TITLE District Drlg. ~neer q~ _ ~4~_ ~ I'l'lOJCJ NOTE-~eport on this form is required for each calendar month, regardle~ of the status of operations, and must be filed in dupfieate with the oil and gas conservation committ~ by the ~Sth of the succeeding month,unl~ otherwise directS. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION January 3, 1979 ANCHORAGE, ALASKA~ TELEPHONE (907)265-00~--'~- ANCHORAGE, ALASKA State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. Hamilton, Director Well B-13 (43-36-11-13) Enclosed, in triplicate, is' Form 10-403,' Sundry Notices and Reports of Wells, for the above-named well This notice indicates our change of plan to set 9 5/8" casing above the pay zone and to co~lete the well with. a 7" liner. PRJ:ja Enclosure cc: Well File ~17 Very truly yours, CC~ 1907 Form 40-403 REV'[ 1-10-73 Submit "intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use ,,APPLICATION FOR PERMIT--" for such proposals.) OIL ~ GAS r-] WELLI "i WELL OTHER ~_. NAME OF OPERATOR Sohio Petroleum Company, .Div. Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR Pouch'6-612, Anchorage, A1 aska 99502 4. LOCATION OF WELL At surface 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) Est. KBE = 65' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20341 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-13 (43-36-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 36, TllN, R13E, UPM 12. PERMIT NO. 78-83 )o~, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The design plans for B-13 have been changed from a 9 5/8" casing to T.D. to 9 5/8" casing set above the pay zone and cc~npleted with a 7" liner. The proposed drilling, casing, and completion program outline is as follows: Drill 12 1/4" hole to 10336' (8647' TVD0. Run 9 5/8" L-80 47# Buttress casing to 10336' (8647' TVD). C~nent with 1508 cu.ft. Class G cement. Drill 8 1/2" hole to 11209' (9193' TVD). Run 7" L-80 29~. Buttress casing liner with ling hanger and PBR from T.D. to 500' inside 9 5/8" casing. Cement with 460 cu. ft. Class G c~ment. Complete with 9836' 7" L-80 26# IJ-4S tubing with subsurface safety valve placed at 2000' NOTE: Verbal approval received re telephone conversation wi%~t.~0,¢ Hoyie'-Hamilton 12/29/78 16. I hereby cer ' y the f~~./~! and correct ' ~ TITLEDiSt' Drilling Engineer DATE SIGNED__~. 1~. (This space for State office use) APPROVEDBY ~~_ TITLE~ ~ CONDITIONS 0~'ApPI~AL, ~'F ,~.Ny: See Instructions On Reverse Side DEPT. OF I'~TURAL RESOURCES DIVo 'OF OIL & GAS CONSERVATION Hoyle ~. Hamilton· Director ..:-,.. Lonnie C. smith Chief Petroleum Engineer BObby Foster Petroleum Inspector December 26, 1978 BOPE Test on SOHIO's PBU B-i3 Sec. 36, TilN, R13E UPM T__hur___sj~%,. December 7 - I departed my home at 5:15 A~{ for a 6:00 AM showup and ~7:00 AM departure of Wien fit. #23 for Deadhorse arriving at 9:50 AM. I proceeded to NGI-12, where BOPE tests, the subject of a separate report, were concluded at 10:30 PM. Results reported by Ben LeNorman, State Petroleum Inspector. Fr~$day..,..December ,8 - Tested SSSV's on wells 1-17, 1-16, 1-10, the sub- ject of a separate report, Results reported by Ben LeNorman, State Petroleum Inspector. _S~at~ur. day, Dec.em. ber~_P~ - Tested SSSV's on Drill Site #6, wells 6-2, 6-3, subject of a separate report. Results reported by Ben ~LeNorman, State . Petroleum ~tnspector. Sunday, December 10 - BOPE test on Pad B-I3 began at 2:30 PM, testing -t-h'e ~'lYnd rams, 4 lower vai~e~ ·~on choke manifold and 1 valve on kill line to 5000 PSIG, A small leak'"'d~eveloped at bottom flange on lower pipe rams, Pressure was bled do~,~.to 0 PSIG and flange bolts retight- ened. Pressure was then brought b~C~k up to 5000 PSIG and held for 5 minutes. The 4 upper w~lves on the ~hoke manifold and the outer valve on the kill line was closed and the 4 ki~pper choke manifold valves and the inter kill line valve were opened. These valves were then tested to 5000 PSIG. The HCR choke line valve was opened and the check valve was tested to 5000 PSIG. The swaco superchoke was activated and the manual chokes were checked for free movement. .%~ese valves checked okay. The test joint was picked up and an attempt was made to make-up test joint into test plug. The control lines on the bottom pipe ram were crossed and the seal rubbers were ruined by the threads on the test joint. These rubbers were changed and the control lines were uncrossed, the test joint was made-up into test plug. The annular preventer was closed and tested to 3000 PSIG _for five minutes. Pressure was bled off and the annular preventer was opened, The upper pipe rams were closed and tested to 5000 PSIG. The upper pipe rams were opened after pressure was held for five minutes and then bled off. The lower pipe rams were then closed and tested to 5000 PSIG for five minutes and then press~re was bled off. The test plug was then pulled B©PE Test on PBU Pad B~I3 December 26, 1978 amd the kelly was picked up and the kelly cock was tested to 5000 PSIG for five minutes. The lc~r kelly valve leaked and was changed out and tested to 5000 PSIG for five minutes. The dart valve and ball type floor valves were checked and were in place before drawworks. The ac- c~ulator pumps were cut off and and the annular preventer and both pipe rams were closed and the HCR valve was opened simultaneously. Accumu- lator pressure dropped from 2890 PSIG to 1250 PSIG. The pumps were then turned on and accumulator shut-off press~are of 2890 PSIC was attained in three and one-half minut'.es. The ~2 backup bottles checked at 2150, 2150, 2350 and 2100 PSIG. Temts were concluded a~ 12:30 AM, 12/11/78. After the tests, a tour of the location wa~ made, The reserve pit was well built, the rig in good repair and the well sign in place. These tests were conducted with Mr. Harold Hawkins, State Petroleum Inspector. In sum~ry: }~lr. Hawkins and i witnessed satisfactory BOPE tests on Sohio's Pad B-13. LCS/BF: emi DATE RIG WELL TEST FLUID ACCUMULATOR VOLUME TEST TYPE: CIWEEKLY E] CASING SET LAST CASING: "AT [] FLANGE UP BP ALASKA INC. BOP EQUIPMENT TEST REPORT BOP STACK-- LIST ALL ITEMS TOP TO BOTTOM, MANUFACTURER AND TYPE, SIZE OF RAMS, ETC. PRESSURE a PERFORMANCE TESTS: I' ACCUMULATOR ACCUMULATOR ONLY & PUMPS TEST TEST ..... CLOSI NG CLOS I N G RECHARGE UN IT PRESSURE TI ME TIME TIME TIME ANNULAR .- " BLIND RAM PI PE RAM · PIPE RAM CHOKE MANIE TEST TOOL: [--~PLUG, [-]CUP, I'"IPACKER(~ KELLY COCK ~1 - CASING TESTED: FT. TO PSI KELLY VALVE ~2 ACCUMULATOR RECHARGE' PSI BEFORE TE PSI AFTER CLOSING ALL BOI INSIDE BOP ~' ' · :*' ;: · MIN. RECHARGE TIME. KELLY HOSE ~ BOP DRILL SEC. STAND PIPE : . . TRIP DRILL SEC. NITROGEN PRECHARGE; 1.~2__$.__ CHOKE LINE ' 4.. 5 6 7__ 8 KILL LINE 9._ I0. II 12. ,,. 14. 15 16.. ;)UIPMENT CHECKLIST YES NO CIRCULATING HEAD ON FLOOR INSIDE BOP ON FLOOR & SUBS KELLY VALVES ON FLOOR I~ SUBS SPARE KELLY VALVE PVT SYSTEM OPERATING FLOW SENSOR OPERATING 'i STROKE COUNTER OPERATING TRIP TANK LOCKING SCREWS ON BOP 8~ ALL VALVES OPERATE EASILY. REMOTE STATION OPERATING BOP HANDWHEELS INSTALLED GAS SNIFFER OPERATING BARITE ON HAND GEL ON HAND WATER ON HAND SURFACE MUD VOLUME HYDRAULIC OIL ON HAND NITROGEN BACKUP SYS BOTTLES HOOKED UP~ AT NITROGEN PRESSURE. SACKS SACKS BBL BBL DRUMS NO. OF PSI MALFUNCTIONS 8~ COMMENTS (ITEMIZE ALL LEAKS, MALFUNCTIONS, MISSING EQUIPMENT, ETC., AND ACTION TAKEN.) BP SUPERVISOR: D~qg. Permit No.7~ ~ OPera tor~O ~_/ ~ ,.~ ]0 Satisfactory Type Inspection Yes No Item O0 Location,General '~I ( ) 1. Well Sign  ( ) 2. General Housekeeping ( ) 3. Reserve Pit-~)open( )filled ( ) 4. Rig ( ) Safety Valve Tests 5. Surface-No. Wells 6. Subsurface-No. Wells ( ) Well Test Data 7. We'll Nos. , , 8. Hrs. obser , , , 9. BS&W , , , lO. Gr. Bbls. () () () () () () () () () () () () Ala. Oil and Gas Conservation Commit. Field Inspection Report Well/Platfm Se^~'T;~ P,j~'''~,~ ~//_~ ~- Represented by~,./~.j./ ~?~..~ Name & Number_ j?~;~ Sati s Factory T.,~pe Inspecti on Yes No Item (~ BOPE Tests () ) () () 1 1 . l'esi[ f'luid-( )wtr.---~--~ )mud ( ) oil 17. Master Hyd. Control Sys.-~2~sig 18. N? btls2i;F 19 R~mote c66trol-~- ' ' 20. Drilling spool- ~/~"outlets 21. Kill Line-~) check valve 22. Choke Flowline ~) HCR val~ve 23 Choke Manifold No. valvs~flgs~ 24 Chokes-~)Rgmote( )Pos.~')Adj. 25 Test Plug-(~tellhd( )cs~( )none 26. A. nnular Preventer~f~psig ~ ( ) Final Abandonment (~ ( ) 27. Blind Ram%9-~opsig ( ) ( ) 11. P&A Marker I~.')~ ( ) 28. Pipe Rams~5~-~ 6psig ( ) ( ) 12. Water well-( )capped( )pluggedk*~ ( ) 29 Kelly & KellY~ock~_'~o~psig ( ) ( ) 13. Clean-up (cz) ( ) 30. Lower Kelly valve~,~_~_psig ( ) ( ) 14. Pad leveled O (~,~) .... ( ) 31 Safety Floor valves-(~()BV (~iODart Total inspection observation time/~ /days Total number leaks and/or equip, failures ~ __ Remarks /~6~'~ //'~.~ ~-Z'.~~-~z/~ ~¢'~ ) ~rl~qc,~x.?z= ~ ~Z~/) ~ _/k?_/_~¢,~..~, .~ ~.~ cc: VJ~'~,~'~- fY .... ~a~s or 'whe~ ready~----qnspected by ;.y~;~ 1/2//'~a¢ ~' Datej[~ r~ove~ ~r 8, 1978 ~~ ~ay Unit L~-13 ~c ~trole~ Cc~.,~.y~ny Perm.it mo. 78-S3 ~r. P. R. J~] ~oI%io Petrot¢..~~: Cc~r~~ Po%~ 6612 P~u(L~r~, Alaska 99502 Fnc!os-~ ~ tb~ ~rov¢~ a~T---lication for ~it ~f~~ ~-~iI at a l~i~ in S~on 36, Tc~~.p 1~, Pmnge ]3~i, U.~. ~e!l ~,les, ~re ~ps, ~ a ~ tc~ ~e nc~ r~juir~l. A directional ~ny ri~rs in Alaska g~ ~~ drayage ~te~ Jn f~e~ areas are s~je~ to P~ 16.50.870 and C~.~ ~e~~ (Title 5, At~%~ Adr~is~a~%~ C~). Pri~ offi~, DepOsit ~ Fi~ ~d ~o!lu~%o~~"~ ~ ~ of ~y wat~ of ~e S~ is ~.~lil~it~ k~~ ~:S 46, ~apter 03, t~leKl!{~atc{.. ~~cer (Title 18, Alas}~a D~ic!e 7 ~ ' lution. ~:~m~aia~rative C~, ~~r 70) a~ hy t}~ ~'ed~'~i Cc~oi A~, ~ ~Jg~- Prior to ~ep~i~ c{~eratio~ you ~c~ed i]~ a rq~~nta~ivc of ~e t~[~ar~e~t of !~virc.~:cnf~J.~ Con- ~z~ntion. P~rs~:t to ~ 38.40, Lo. at ~:i~ Ur~r State Lease.::~, ~:~:: office ~:~ith~ .4~ ~ -~ aft~' tl~e ~<cl! is: ~.~ ?H% P. ~.. Judd -2- !'~vcn~l.~r 8, 15~7~ P~dhoe Bay Unit, B-t3 like to ~ rotified ~ t~t a representative of the Division may he present to witness test/~ng of blowout preventer e~]ipment l~i'ore surface cas~ shore is drilled. Ira.. ~ e%~nt of stuS~nsion or a~mm~o~m~nt, please gi%~ this office ad~t~ a~;ance notification ~ t~=mt ~ may have a witness present. Very truly ~, A!~ Oil & ~ C~~a~ C~it~ Encl~ cc: L~~t of Fill & Game, Habitat Section w/o encl. Department of En-v~onm~ntal Cor~~tion w/o encl. E~pa~nt of I~bor, Supervisor, Labor Law C~liance Division w/o encl. SOHIO PETROLEUM COMPANY Division of S(Jhio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 October 25, 1978 State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Hoyle H. Hamilton Director Gentlemen: Well No. B-13 (43-36-11-13) Enclosed are the following documents: 1. Application for Permit to Drill 2. Proposed Drilling Program Outline 3~ Our check for $100.00 to cover the permit filing fee. 4~ Three copies of surveyor's plat showing well location. Very truly yours, SOHIO PETROLEUM COMPANY PRJ:ja Enclosures P. R. Judd District Drilling Engineer · cc: Well File #17 Form IO-4-01 SUBMIT IN TR' REV. 1-1-71 (Other instruc, reverse side) la. TYPE OF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE ~TE oi1 PERMIT TO DRILL OR DEEPEN DRILL [-~ DEEPEN [--} b, TYPE OF WELL OIL [-~ GAS SINGLE MULTIPLE WELL~ WELL [~ OTHER ZONE [~ ZONE D 2. NAME OF OPERATOR Sohio Petroleum Company, Div.... Sohio Natural Resources Company 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage,,,Alaska 99502 At surface 1608' WEL, 1740' SNL, Sec. 31, TllN, R14E, UPM At proposed prod. zone ~ 1210' WEL, 1780' NSL, Sec. 36., TllN, R13E, UPM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 10 miles NW of Deadhorse API 50-029-20341 6. LEASE DESIGNATION AI~D SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-13 (43-36-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM · HOLE OBJECTIVE) Sec. 36,. TllN, R13E, UPM 12. 14. BOND INFORMATION: Xr~E Blanket Surety and/or No. American Insurance Company 3348616.~ou,t $100,000.00 DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. ' (Also to nearest drig, unit, if any) 1210' W of ADL 28310 18, DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 258h' E of Wo~l] A-8 21. ELEVATIONS (Show whether DF, RT, CR, etc.) KBE = 65' AMSL est. I 16. No. OF ACRES IN LEASE 2560 19. PROPOSED DE~H 11,678'MD 9559'TVD 17. ND,ACRES ASSIGNED TO THIS WELL 160 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL START December 15, 1978 23. PROPOSED CASING AND CEMENTING PROGRAM' , . ' SiZEOFHOLE sIZioF~ASING ~ZIGH~PERF~G' G~DE MD, SETTINGDE~,VD' ,~antityofcement 36" 30" x 20" :nsulated Conductor 110' 110' 454 cu.~t. Permafrost ,,, 17~" , , .z . 13 3/8" 72# L-80 2670' ' 2670'~3500 cu.ft. Permafrost , 12~". 9 5/8" . 47# L-80 :.8856' 7500' 2055 cu.ft. Class G 12~" ,9 5/8" 47# ..Soo-95 11678, 9559' See attached program. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on. present productive zone and proposed new productive zone. If proposal is to drill or deepen direcfionally, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer progam. 24, ! hereby certify that the;Foregoing is True and Correct ~, .. .~ ~ ~ ,? / /L z ,;/., ,"; t' .. .P- E, 5:'_dd ..... DATE nTLEDiSt. Drilling Engineer (This space for State offic~ use) SAMPLES AND CORE CHIPS REQUIRED C-! Y~S ~ No DIRECTIONAL SURVEY REQUIRED ~YES [] NO MUDL~ [] YEs CONDITIONS OF APPROVAL, IF ANY: OTHER REQUIREMENTS: SING A.P.I. NUMERICAL CODE PERMIT NO. 7 g - g.3 APPROVAL DATE November7, 1978 ApPOvED By/~ ~7 -/"w;~ k;i~'~ A?',,,~ ;'J//>'~/~'"'~"/'~TITLE Chai~ DATE 11/8/78. / *See Instruction On Reverse Side PROPOSED DRILLING AND COMPLETION PROGraM Dry bucket 36" hole to 80 ft. below a ground level and cement 30" x 20" insulated conductor to surface using Permafrost cement. Drill 17 1/2" hole to 2670' and cement 13 3/8" 72~ L-80 Buttress casing to surface using Permafrost cement. Blowout Preventer Program consists of 5000 psi ~ pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Directionally drill 12 1/4" hole to 9559'± T~. Run 9 5/8" 47# L-80 and Soo-95 Buttress casing to 9559' TVD and cement first stage with 1705 cu.ft, cement. Cement second stage through DV collar at 2300'± with 350 cu.ft. Permafrost C cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus being displaced to Arctic Pack through a "FO" cementer placed at 2050'. Run 7" 26# L-80 Atlas Bradford IJ-4S tubing with a production packer assembly at 8599'± TVD. A subsurface safety valve with dual control lines, will be placed at 2000'±. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. 30 lO 2( 30 ~' 03 O3 04 !_ i'0 20 50 40 I 29 02 36 {P~opo sed } i 32 1 .~ I .... ('Proposed } LAT, .: 70° I 5' 56.02" ~ LONG q48°40~ 24.42" 664,05~ (Pr OD OS ~ ~) ,.,----, 600' 880~ r~ t PORTION OF T tl N, R 14 E, UM CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed tc practice land surveying in the ~tata of and that this plat represents o iocation sur,,ey made by rne or under my super,,~sion, and that ali dimensions and othe~ details ore correct /0_..._-._.. Z_Z ........... Date Surveyor' ADDED (PROPOSED) BOTTOM HOLE LOCATION iB.I36 B.14 !0-25-18 C,J.R. ADDED (PROPOSED) BOTTOM HOLE LOCATION B- 12 9 -26~78 C.d.R, ADDED (PROPOSED) BOTTOM t~OLE LOCATIONS B-9, B-IO ~ B.. il 9-: i5-78 C J.R i B ~ I.¢ ' ,~ .~.. Jr?.- Ii- 14.; Iv' - I~ r4.~. 6&- 13} SUM P ,2 ~_ ~ ,,,-~.:,. ,,,~, PAD DETAIL SCAt. E i": 500' PAD "B" EXTENSION Locdted in Surveyed for B.R ALASKA INC. .... i tlJ[. _ It[l[IU ,,ll[llll:ll [ .i iJJl_ Surveyed by. E M. LINDSEY 6 ASSOC. LAND 8~ HYDROGRAPHIC SURVE¥'OR~ ok,'2 West Norfhern Lights Boulevard BOX 4. Anc:t~orage Alaska . ! !I Lb i_ 'Jll.l i i! _ - ' -- Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi .. No 'special'effort has been made to chronologically organize this category of information. .o Yes No / 2, Is well [o be located in a defined ~1 .............. 3. Is a regi. ster~ survey plat attached ............... 4. Is we]_! located proper distance from .property line ,,. 5. Is well located proper dis-t~ce from other we]Is 6. Is sufficient undedicated acreage available in this pool ...... Ts well ko be d~viaL~d ....................... . 8. :rs ol~¢rator t/n~ ©nl7 ~ffecCed p~rty ................ /. 9 Can ~.nit be aporoved before ten-day wait i0. ~)es operator h~ve a bond in force ................. .... a conse:~ation order needed ................... ].2. Is adainistrative approval needed ................. ]_3. Is c~-:?,tduc-Lor string provided ................... -~,,t Is enough ~o;"~p'~:t. usod to circulate ~ ........... o~. conductor and sur:~ace · 7 . c.~=~:.~ tie in surface ~nd ~'~termedi. ate or pr:tutti, on s/rinas., .... C.~ .. .... t. cover all }.:no~lTM~, .,. pr~::.,_~x.e horizons : 7. ~"-;, ].] ,_~.~"~=~ ~ ~.,~.~ .... casina nrol-ect fresh water ?:ones . . . ' v'.. :.. ~ .... :, ' ' ' ....... ~i_..' _ : !.,." I:~t'.s }:;,OPE have su~fJ_cient nressure rat~:-:~' - T~-:~"~ to o0~r. / pszc~' ~': ..'~.~ -- (5) .... ...,:,,"'~ {)-..{,'1 { /c:.l~' ~/7 ~ ' - ._. . .............. --~' .~ ........ ~:. "~0 Has ' - :9 ' .:kld i t;Lon a i Requ J rem('n ts: , C~o]_~ - R-n:~ i nec :J ::.,::, '-' ' BVA ................. / '~: ~',: " . ............ 1] 1.1,11 !ili i t 1.i 1 i 11 1I 11 !!11!,!, ]11,,1tl., 7717777'177 7777'177777 77 77 77 77 77 77 77 77 77 71 7'? 000000 000000 O0 O0 O0 O0 00 0000 O0 0(;00 00 00 00 00 00 00 0000 O0 () 0 0 0 0 0 0 0 0 0 0 0 0 0 000000 000000 77777777'77 777'777777 7 ? ? 77 77 77 77 7 ? 77 77 '77 ? '7 222222 2:22222 22 22 22 22 :22 22 22 22 22 22 22 2222222222 2222222222 222222 222222 22 22 22 22 22 22 22 22 22 22 22 2222222222 22222222:22 666666 666666 66 66 66 66 66666666 66666666 66 66 66 b6 66 66 66 66 666666 666660 d &.r~AAA P F ~ I I. u707,o022ol ,J ! i..,- 7 9. * S "I'A F "i' * 0 U [3 D t) ,.) 0 U O U t] l.) 1 ~ i.l l) D tJ i. I 0 D 16:10:56 ,.IU¢ S~.[P 8i:':~o ~549 DATL. 14-Y~h~:-80 l~;10:56 I i 1. i i i I I 1 l.l [I 15145:00 lt:lO:5t VV VV VV VV VV VV V V VV VV VV V V V V I I I I I i I !, i 11 ~! Ii 1 I II I 1 I ,[ I I i 1 1111 it I i .t I i i ! ¥ Y ¥ ~ YY YY ¥¥ ~ ¥ ~Y ,3t:z:.i--~. lt, i.~SFI::: PC..'~,L.: I !07,')7 ,,,f~02.~e>l ...Jiib ': ~:.'i i.j i-,i .[ ']" i.i i,:':' ,~::,/.! ,.:~ k t.~ ] (.i b ] ~i ~} i! [.; ,- ] 9 . ,~ ~ T h ~ 'I.1' ~- ~t'!E Uk &;,'.,.' l ']-'('[ t-'iBt; .', / F 1 l,k;: j: uit.,'T /CO,E'IF:5: i /S.F'nC].i'i(;: ] iJ,.lf'tI']': 10~ IF(]F~".S',t.~(JHb~iP, B 1 i6:0U:59 16:10:5b 0707 Ol APE; DATE:; 801 511.,4 DATE: 801 51:1 i:~ &Sb L! r.: K 1 0:2,4 t: (/N ,L G P, 1~ CNb Gl.' i' C f<, L i;~ C N L ? C 0. 9. -999. i8. 77. 22. !03, 239. 2. 63. 9:1.. 22. 57. 186. 66. 192. 2. 43. 60. 186. 000 000 () () 0 600 22 0 ,':l 00 5 2O 000 (,i 5 100 492 76 ;1 08*) 600 486 I 40 300 924 /, 92 297 000 :186 8. 4O -999.25:) -999. ~50 ! 12. 990 -999 -999 -999 -999 .25'.') .25n .250 ~' C N b i",i C lu b r~ P H I. C;P j.k} C .Pi b h C i'1 L N P .?,.~ ,'t: G~ N C i~ L .IcC {~ L fr:C ?':i L {'~ ii> ~'i I ~PHI Gl-<, N P l:,:i I V ~ b [J E 0.000 -999.000 -999.000 -999. 000 1,4. R 8 D 0. O 00 0.000 ?227. '{ 70 9.680 6. 800 107 .~79 242.385 20. 060 6,3.921 I 8 '7 . 0 4 4 21.800 27.70 0 6:1.776 193. 050 ! 0. 460 58.000 64.779 :I 91. ,;~ :] 4 I 8. 000 63.921 186,!.86 -999P5.000 81.200 -999.250 -99925.000 -99q.250 -999.250 -99q.250 r,t p H i G F', i),t P .H i, V a b V E 0.000 -999.000 -999.000 ,-999.000 2.648 0.000 22.100 91.377 N N E M :L,} N .1 C V A L, U g NCNb 0.429 NRAT -999.000 NPHI -999.000 NCI~tL 206.7 ? 8 N R A T - 0 . 002 NPHI 13 . 200 NRi:[: 2,166 NCNb 2]0.802 i~PHI 8.880 ~RAT 2.138 GR 25.800 NPHI 8.560 f':C~l 111,540 ~[~.AI' 3.052 NCNb 195.624 ~PH1 22.520 NRA'r 3.188 G};~ 24.200 NPHI 21.280 fCNL 06.066 ;1~h'l/ 3.1.90 NCN~ 18~.1, B6 NPHI, 19.040 NRaT 2.896 GR 25.800 N~HI 22.080 ~CNL 58.77] J'~ :[~ A']: 2.22't NCNb 191.334 f,~PHi 9. ?00 NRAT 2. 020 GE< ,58.1 O0 NPHI 11.120 fClqL 69. 069 2.92~ 16.320 44.600 64.350 4.696 37.320 -999.250 -999.250 -q99.250 -99925.000 -999.250 -999.250 G~ ilPHI G~ ~CNL NCNb 182.325 NRAT 2.666 NPHi 17.520 b' i~; ' ,-~C :'~ b 999 250 NR, AT 4. 084 NPHI -99925.000 [~CND -999.250 NRA'[ -999.250 NPHi -99925.000 DATE; 20/ !! ii Ii IL JJ j i I1 111111 10 'i 1 AP1 O 0 0 0 0 0 0 u o 0 0 0 0 0 o 0 0 0 o 0 I 05.09, ~..i i) v 2.174 1.72'9 3.929 t. 7 2 ,a (). t u (; ~"~. I 2% -iU00.25~ 15.t25 i '1. 42. 1,34.~25 22.1qb 191.260 4~.125 0.000 51 bl () ! 1 {) I 9 P, i~ 0.0 () 0 r 2t' ~ '7 -9V9. ~5. t 50 ~ '74.250 53. 25 '2.25o > 3.45a 7 5t . '7 h u 8t,~.250 07.55o - I !)uO. 250 -~99.250 r:. [,., C 0 ix L.' /0 // t 1i 0 0 u 0 u 0 0 0 0 O 0 0 0 t' z i~ L~ t . 72 ':J 86o G h 377, 750 29 1.50O iot,!25 61. 2.0 30 1.}ll ,-'~ 99,25u .3 56 . 0 () 0 3 3. ! ~ 5 .ti. 1 I.. 500 a{~. ul 5 blGf .t" 1 1' [) J I i' i) ~3IGf IJ~ 1 T L~ FIIO F 1 T D 51GP -iOUO,2bO 104.125 I t. 7 2 0 i I. 0 0 0 31.325 I i t. OOO 1 e, i .:750 a~. 0. 2 % ? _. ]. l z 9 -999.250 ,t d. / 29 /i. ~'7~. 125 ,;}07 .~ 9. I 9 5 42 t. 125 G, uuO -touu.2bO I~.oUO 97. 125 26.655 J ~5. 750 z2.10u tg~ .500 39.020 t>b.125 5 9.00 u 0.0 o 0 /7 024 DgPT SH 1 ~ T I 9. 965 i"Td. b25 22.1 38~.125 .~20.125 2b.520 39. 425 .t~25 oO.u15 t). 0 o 0 -iU00.~59 -999.250 i5.4o5 1~.b4:5 z~.285 138.000 2z.205 I~I.~25 ,~ ~. '7 2 5 5b. oo0 ~9 VV · Vv YV VV VV VV VV VV VV VV V V VV V V V V UV VV ililii iIIIiI II II I! ii II 11 Ii II II II I,IIIII liIiIi ~F FF 000000 000000 5555555555 000000 000000 5555555555 O0 O0 O0 O0 55 00 O0 O0 O0 55 O0 0000 O0 0000 555555 O0 0000 O0 0000 555555 O0 O0 O0 O0 O0 O0 55 O0 O0 O0 O0 O0 O0 55 0000 O0 0000 O0 55 0000 O0 0000 O0 55 O0 O0 O0 O0 55 55 O0 O0 00 O0 55 55 000000 000000 555555 000000 0o0000 555555 *STAR:* USER PCCC [10706,54~00] 00i5 SHIP !qONiT[]R 5v~S KLI. OF:.~31 2t.-t:,i0V-78 *START* FILE: DSFH:VEHIFi.O05<057>[1070~ 548001 CREA'rED: PRI~TED: 02-F'ED-79 17:5~:31 OOEOE S~iTCHES: /~IhE:FORT /COPIES:i /SPACING:I /bi/'4i'[:117 /FORNS:NORi'~AL 5q44 DATE 02-FEB- 79 02-~"EB-79 17:53:54 !7:57:53 P&CIFiC COAST COMPUTING CENTER 10706,54600 I, ENGTH: 132 BYTES REEL NA}IE: P.C.D.C. SERVICE NAb~E: EDIT REEL CONT1NUATIUN NUivIBEH: Ol PREVIOUS REEl., NAME: COMMENTS: LIS FORHAT CUST[)ME',,R TAPE TAPE HEADEP, I,ENGTH: 132 BYTES TAPE NAME: 54600 SERVICE NA~E: EDIT TAPE CUNT.iNUATiON NUMBER: 01 PREVIOUS TAPE NAME: C.f}t~MENT8; DATE: 79/ 2/ 2 DATE: 79/ 2/ 2 Flbg iihADER LENGT.H: 62 BY'rES FiL, E NAME:: EDIT .00~ ~AAIMUN P?~'ISICAb RECORD LENGTH: PREVIOUS f'ILE NAME: 024 BYIES W[qL6 Slik iN~UP,,qATiON RECORD BENG'£B C{}MPAN'I F IEI, D C {i I.i N I' STATE 129 B~TES SOHIO PETROLEON CO. B-13 PRUDfiOE BA~ N.SLOPE ALASKA 0 SIZE R~P CODE 1 6 b ENTRY I.C TOtJf.~ 5¥0i~D~ [.t?,~IT8 aPI /~PI APl AP1 Fibg# SIZE EXP PROC S.~.i~ REP DE;PT $~ilFT DEPTH 040 . 000 1!,000.000 1, 0900 . 000 1O800. 000 1:0700. 000 10600.000 !0500.000 04:00. 000 10300.000 10200 . 000 lO ! O0. 000 10000 . 000 qg00.000 9~00.000 q 700.00 () 9600. () 00 q 500.0 t) 0 9400.000 q 300. 000 SP G~ SP GR SP GR SP SP GR SP GR SP GR SP SP SP GR SP Gk SP SP SP (';R SP VALUE -117.949 -0.300 -124.615 25.100 -I12.30~ 18.800 -108.205 27.000 -108.205 27.000 -74.~15 73.800 -95.897 57.400 -,55 897 90:000 -34.359 70.900 -34.359 -0.400 999.250 -999.250 999.250 -999.250 999.25O -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 C I L D GR CILD GR CILD GR CILD GR C ILD GR CILD GR, CiLD GR CILD CILD G}{ CILD GH CILD GR C iLO GR CILO GR CiLD GH CILD GH CILD G~ CiLD CILD GR C I b D GR VA L UE 539.511. -0. 300 510.505 21.100 111.686 21.200 61.944 30.900 40.179 25.300 71 121 1031600 76.560 69.100 672.977 104.900 147.231 62.500 210.~63 62.900 -9gg.250 69.200 -999.250 50.700 -999.250 69.g00 -999.250 /~1.600 -999.250 ~0.000 -999.250 56.500 -999.250 52.400 -999.250 47.000 -999.250 55.000 VALUE 519.996 88.700 432.514 88.550 98.175 82.200 60,256 96,200 37.670 :101..]00 63.096 62.250 57.016 81.850 625.173 137.100 0.006 99.600 0.006 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 MNEMON lC C Ii,! L 8 C 51.,8 CLb8 C L b 8 CLL8 C LL8 CLL8 CLL8 CLL8 C LL 8 CLL8 C L L 8 CbL8 Cbb8 CLL$ CbL8 CLL8 Chh8 CLL8 VALUE 343.558 233.346 46.989 5].456 39.8il 20.893 66.069 496.592 505.825 534 =~4 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 l) E P 9200. 000 9100.000 9000.0()0 890O.OO0 ~800.000 8700.000 8600.000 8500.000 8400.000 ~300,000 8200.000 alOO.OOO 8000.000 7900.000 '? 800.000 ?Tr. 0 000 7600.000 '15 o 0.000 '1400.000 VALUE 999.250 -999,250 999,250 -999,250 999.250 -999,250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.25O -999,250 999.250 -999.250 999.250 -999,250 999,250 -999.250 ~NEF~ONIC CIL[) GR C GP, C GR CiLD GR C I Gl?, CILD CiLD GR CILD GR CILD C i GR C ILD CILD GH CibD GR CiLD GR CiLD Gl4 CILO GR CiLD GR CILD CILD Gl-,' ~ALIIE -999,250 56.600 -999.250 94.6O0 -999. 250 1 O0.40O -999.250 60.200 -999.250 69.400 -999,250 103,400 -999.250 91,300 -999.250 79,300 .-999,250 59.800 -99~.250 46.500 -999.250 50.900 -999.250 59.500 -909.250 49.~00 -999.250 6~.600 -999.250 53.~00 -99~.250 52.20O -999.250 47.000 -999.250 -999.250 6~.000 VALUE -999.250 -999.250 -999,250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.~50 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999 250 MNEMON lC CLL8 CbL8 C L L 8 C Lb8 CLL8 Cbh8 Chh8 Chh8 C h h 8 CLL8 Chh8 C bLS CLb8 C bLS CLL8 CLb8 C L.L8 C bl, 8 VALUE -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 D g PT ~ ? ,300.000 7200.000 7 t O0 . 000 7000.0O0 6900. 000 6800. 000 6700.000 6600.000 ,6500,000 6400. 000 6 ~ 00 . 000 6200.00O tlO0.OO0 6000.000 5900.000 5~00,000 5700.00o 5600.000 55~0, t, 00 M N E~ SP GR SP 8P GR SP G~ SP ;S P SP GR SP 0 N i C VALUE; 999,250 -999.250 999,250 -999,250 999.250 -999.250 999.250 -999,25{) 999,250 -999.250 999,250 -999,250 999.250 -999,250 999.250 -999,250 999,250 -999,250 999,25O -999.250 999.250 -999,250 999.250 -999.250 999.250 -999.250 999,25{) -999.25() 999,250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999,250 -999,250 CiLD C I L D GR CILD C 1LD CILD CILD GR CILO C ILD GP, C I b P CILD GR CiLD G~. CILD Ge CiLD GR C I I., D GR CILD GO, CILD CiLD GR CILD Gl:{ CILO GR VALUE -999.250 58.700 -999.250 50.500 -999.250 5O.60O -999.250 52.100 -999.250 47.20O -999.250 35.200 -999.250 47.400 -999.250 43.500 -999.250 48.600 -999.250 32.600 -999,250 48.800 -999,250 55,~00 -999.250 27.100 -999.250 ~6.~00 -999.250 2{.500 -999.250 27,{00 -999.250 39.~00 -999.250 43.~00 -999.250 30.100 VALUE -999,250 -999.250 -999,250 -999,250 -999,250 -999,250 -999,250 -999.250 -999,250 -999.250 -999.250 -999,250 -999,250 -999.250 -999,250 -999,250 -999,250 -999.250 -999.250 -999.250 -999,250 -999,250 -999,250 -999,250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -9~9,250 -999.250 -999.250 ~iNEMON lC CLL8 CbL8 C h L 8 CLL8 C L L 8 CLL8 C LLB CLL, 8 CI.,L8 C h L, 8 C bbs C bbs CLL8 Cbb8 Cbb8 Chh8 Chh8 Chh8 CL, b8 VALUE -999.250 -999.250 -999,250 -999,250 -999.250 -999.250 -999.250 -999.250 -999,250 -999,250 -999,250 -999.250 -999.~50 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 .5400,000 S300. 000 5200,000 5100,000 5000,000 qgO0. 000 48O0. 000 4700. 000 4600,000 4500,000 4400.000 4300,000 4200. 000 4100.000 4000.000 3900.000 3800.000 '~700. 000 3e, O0. 000 SP GR SP SP GR SP SP SP GR SP SP GR S? GR SP (;R SP g~ SP SP GR SP GP, SP SP 8P GR V A L U E 999.250 -999. 250 999.250 -999.~50 999. 250 -999. 250 999.250 -999.250 999.250 -999.250 999. 250 -999. 250 999.250 -999.250 999.250 -999.250 999.250 -999,250 999.25() -999. 250 999. 250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999. 250 -999.250 999.250 -999.250 NNEMON lC C ILD GR C I I..,D GR C I h [) GR CiLD GR CILD CiLD g~, CILD GR C I b O GR C I L O GR C ill) GR CiLD C I b D GR C I L O GP, CiLO GR C lbo CILD GR C I LO GR CILD GR C I L D GR V AL -999 4:3 -999 ~4 .25O . ~00 .250 .500 -999.250 48. 500 -999. 46. -999. 42. -999. 61. -999. 42. -999. 27. -999. 35. -999. 3 (). -999. 50. -999. 45. -999. 44. -999. 34. -999. 54. -999. 34. -999. 49. -9g9. 45. -999. 40. 25O 7 O0 250 400 250 200 250 900 250 3 O0 250 800 250 gO0 250 100 250 7 O0 250 200 250 800 250 500 250 8 O0 25O 80() 250 gOO 25O 80O C ILi'4 CILtq C DT C iLS tOT C I [~ M DT CILM DT CILM DT CIL.M DT C DT CILM C CILM OT CIL~ DT CIL~i C ibm DT C IL~ DT VALUE -999.250 -999.250 -999.250 .-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 b'tN ENON lC C ,h 68 C668 C 15 L 8 Cbh8 Chh8 C b b 8 C.hh8 CLL8 CLL8 CLL8 CLL8 C b L 8 CLL8 CLLM Cbb8 CbL8 Cbb8 CLL8 VALUE -999.250 -999,250 -999,250 -999.250 -999.250 -999.250 -999.250 -999,250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 7 DEPTH 3500. 000 ]400. 000 ] 300.000 ]200.000 3100.000 3000.000 2900.000 2~00. 000 2700. 000 2670.000 MNE;H(3N lC G[~ SP SP SP GR GR SP GR SP GR SP SP GR GI~ 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 999.250 -999.250 MN EMON IC C ILO GI~ CiLD C I. LD GR C1LD C ILD GR C ILD GR C ILD GR CILD CiLD CILD GR VAb[IE -999.250 37.800 -999.250 54.200 -999.250 50.1,00 -999.250 40.000 -999.250 45.100 -999.250 48.200 -999.250 32.000 -999.250 27.700 -999.250 20.2(i)0 -999 250 26:600 VALUE -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999 250 -999:250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 V,ALUE -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.~50 DATA RECORDS N[jNBEP OF HECORDS: 541 I.,,ENG~I'H OF RECO/<D;S: 998 LE~NG~[H OF LAST REC[~Rt'.): .38 BYTES ~ILE T~A ILEf~ LENGTH: 62 BYTES FILE; NA~4E: gOIl~ .001 ivlA×IMUM PHYSICAL RECORD LENGTH: NEXT FIBE NA~JE: TAPE IRAILER LENGTH: l'J2 BYTES TAPE NAME: 54600 SERVICE NAME: EDiT TAPE CONTINUATION NEiNBER: 01. NEXT TAPE .iqANE: C OM~'~E~NTS: 1024 BITES DATE: 79/ 2/ 2