Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
177-034
PLUGGI_~iq~ & LOCATION CLEA~_NCE REPORT State of Alaska 0IL & GAS CONSERVATION CCHHIS$ION ,As/ Review the well file, and-cerumen: cn pluqg/.ng, well head s uauus, and !ccaUicn clearance - provide loc. clear..code. L ~e . ~ · ~rker ~csu o= ~la~a: Locaulcn Clearance: '~JD Code ,7 Signed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMib61ON WELL COMPLETION OR RECOMPLETION REPORT V E D 1. Status of well Classification of Service Well , ui i 2O 1999 Oil r-] Gas r-] suspended ~ Abandoned r~ Service ~ 2. Name of Operator 7. Permit Nt~(a 0il &Gas C0m;. C0m~issi ARCO Alaska, Inc. 77-34 3. Address i8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360~ 50-029-20254 4. Location of well at surface,~~"- 9. Unit or Lease Name 2733' FNL, 5069' FEL, Sec. 32, T11 N, R15E, UM Prudhoe Bay Unit At Top Producing Interval{i . i~,~--- ~.ti '~¢ .. .. 10. Well Number 3.655' FNL, 1629' FEL, SEC;. 32, T11N, R15E, UM~'.~.~:.~~. 05-09 '.;:~'* ~ 11. Field and Pool At Total Depth 4073' FNL, 1477' FEL, Sec. 32, T11 N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 64 feetI ADL 28329 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions July 5, 1977 July 26, 1977 May 1, 1999 (P&A'd) I N/A f,~t MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 10230' MD /9058' TVD 9898.5' MD /8777' TVD YES [~ No ~--~I 2234' feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR/Cal, FDC/CNL/GR/Cal, GR/CNL/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WI'. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 20" 94# H-40 Surface 110' 32" 281 Sx PF 13-3/8" 72# MN-80 Surface 2750' 17-1/2" 500 Sx AS 9-5/8" 47# N-80 Surface 10217' 12-1/4" 1100 Sx Class G & 300 Sx AS I 24. Pedorations open to Production (MD + IVD o! lop and Bottom and 25. IUBING RECORD interval, size and number) SIZE DEPIH SET (MD) P^CKER SEI (MD) 5-1/2" 0055' 98:36' 4-1/2" ~011' 3-~/2" 101~3' * Plugged & Abandoned all open perforation intervals. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See P&A Summary) 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) N/A Plugged & Abandoned Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I N/A Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. * This 10-407 is submitted as directed per the 10-403 form approved February 17, 1999 (Approval #399-023) Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate NAME Top of Sag River Top of Shublik River Top of Sadlerochit Base of Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 9437' 9482' TRUE VERT. DEPTH 8386' 8425' 8496' 9566' 10125' 8969' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS Summary of 05-09 Pre Coil Tubing Sidetrack Plug & Abandonment Operations. 32. I hereby certify that the following is true and correct to the best of my knowledge, Signed ~ Bruce E. Smith, P.E. Title AAI Coil Tubin,q Drilling Supervisor Date __ INSTRUCTIONS Prepared by Paul Rauf 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 05-09 DESCRIPTION OF WORK COMPLETED PRE COILED TUBING SIDETRACK PLUG & ABANDOMENT SUMMARY Date Event Summary 4/26/1999: 4/28/1999: 4/30/1999: 5/01/1999: 5/02/1999: 5/04/1999: 5/05/1999: 5/07/1999: 5/08/1999: 5/11/1999: 5/16/1999: 5/17/1999: 5/18/1999: RIH & tagged PBTD @ 10128' MD. MITIA to 3000 psi - passed. MITOA to 2000 psi - passed. RIH w/tubing puncher & shot circulation holes in the 3-1/2" tubing (in the straddle) @ the following intervals: 9867'- 9872' MD 10028' - 10033' M D Used a 1-11/16" tubing puncher & all shots were @ 4 SPF. POOH. ASF. RD. A CTU Cement Plug was pumped to Plug & Abandon the lower wellbore prior to ST operations as follows: MIRU ELU. PT'd equip to 3000 psi. RIH w/2-1/8" tubing puncher & punched circulation holes in the tubing in the straddle @ the same intervals mentioned above (also @ 4 SPF). POOH w/tubing puncher. RD ELU. MIRU CTU. PT'd BOPE to 4000 psi. RIH w/CT & killed well w/KCL Water. Tagged PBTD @ 10126' MD. Pumped 30 bbls of 17 ppg Class G Cement, to abandon the open perforation intervals located @: 10030'- 10045' MD (Zone lB) Reference Log: BHCS 1/17/1999. 10074' - 10125' MD (Zone 1 B/lA) Placed 15 bbls of Cement into the void between the staddle packers & 4 bbls of Cement behind pipe into the perfs. Attained a max sqz press of 3000 psi. Contaminated cement w/ Biozan & jetted contaminated Cement f/the wellbore to 9800' MD. POOH w/CT. RD. RIH & tagged TOC @ 9802'. MIRU CTU. PT'd equip to 3500 psi. RIH & milled Cement to 9853'. POOH. FP'd well. RIH & milled Cement to 9940'. POOH w/BHA. RIH w/UR & UR'd f/9940' to 9775'. PT'd well to 2500 psi - passed. POOH. FP'd well. RD CTU. RIH & UR'd f/9770' - 9940'. POOH. RIH & drifted to 9941' w/dummy Whipstock. POOH. RU ELU. RIH & set TIW Whipstock Anchor @ 9910'. PUH & retagged anchor @ 9935'. Anchor moved to BTM. RD. RU ELU. RIH & set TIW Whipstock Anchor @ 9910'. RD. MIRU CTU. Cont RU. PT'd BOPE. RIH & set Whipstock in anchor @ 9908' MD. POOH. RIH & tagged Top of Whipstock @ 9898.5'. Began milling @ top of tray. Continued w/05-09A Sidetracking Operations. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon _X Suspend _ Operational shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _X Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Perforate _ Other_ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 2733' FNL, 5069' FEL, SEC. 32, T11 N, R15E, UM At top of productive interval 3655' FNL, 1629' FEL, SEC. 32, T11N, R15E, UM At effective depth 3944' FNL, 1590 FEL, SEC. 32, T11N, R15E, UM At total depth 4073' FNL, 1477' FEL, SEC. 32, T11 N, R15E, UM 5. Type of Well: Development __X Exploratory __ Stratigraphic __ Service _ 6. Datum elevation (DF or KB feet) RKB 64 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 05-09 9. Permit number / approval number 77-34 10. APl number 50-029-20254 11. Field / Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2646' Production 10153' Size 20" 13-3/8" 9-5/8" 10230 feet Plugs (measured) 9058 feet 9967 feet Junk (measured) 8835 feet Cemented Measured Depth 281 Sx PF 110' 5oo sx AS 2750' 1100 Sx Class G & 300 Sx AS I 10217' PBTD tagged @ 9967' MD (1/1/1999) ORIGINAL True vertical Depth 110' 2750' 9047 RECEIVED Perforation depth: measured true vertical 10030' - 10045'; 10074' - 10125'. 8889'-8901'; 8926'-8969'. .a~Ka Oii~ ~' Gas Cons. Cor;i~ission Anchora!~e Tubing (size, grade, and measured depth 5-1/2" 17# L-80 PCT @ 33' MD; 4-1/2" 12.6# L-80 PCT @ 3011' MD; 3-1/2" 9.3# L-80 PCT @ 10153' MD. Packers & SSSV (type & measured depth) Baker DB Packers @ 9836' & 10061' MD; 4-1/2" Camco BAL-0 SSSV @ 2234' MD. 13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __X 15. Status of well classification as: 14. Estimated date for commencing operation March 1, 1999 16. If proposal was verbally approved Name of approver Date approved Oil __X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Bruce E. Srnitht P.E. ,~",~/-,.~Title: AAI Coil Tubing Drilling Supervisor FOR COMMISSION USE ONLY Questions? Call Dan Kara@ 263-4837. Date Prepared by Paul Rauf 2~3-4990 Conditions of approval: Notify Comm!ss.j,i,i,~ so representa~t~ may witness Plug integrity ~ BOP Test __¢ Location clearance _ Mechanical Integrity Test __ Subsequent form required 10- Approved by order of the Commission ORIGINAL SIGNED'BY Robe.t N. Commissioner Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE DS 5-09 Intended P&A Procedure Objective: P&A existing interval in preparation for CT sidetracking operations. Intended Procedure RU slickline unit, tag bottom, install dummy gas lift valves. Drift tubing to 2.8" to XN nipple at 10070'. RU E-line unit. Shoot circulation hole in 3-1/2" straddle interval at 9856'-9870' and ~975' !9a~,n2' for P&A cementing. ~ RU CTU. Load and kill well. RIH with coil, tag TD. Pump 35 bbls Class 'G', 17 ppg cement into 9-5/8" casing from TD to the tubing tail, and up into 3-1/2" tubing and 3-1/2" x 9-5/8" straddle annulus to 9800'. Squeeze up to 5 bbls cement into open perfs. WOC. RIH with motor/mill. Mill cement to 9930'. RU E-line unit. Run in hole with mechanical whipstock. Set whipstock for a KOP at 9900' February 3, 1999 6 5 2 COILED TUBINO UNIT BOP EDU ] PHENT 1. 5000 PSI 7" WELLHEAD CONNEC~0R FLANGE 2. 5000 PSI 4 1/16" PIPE RAUS 3. ~000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS D. ~X)C) PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX HIREL ]NE BOP EOU] PMENT 1. 5DDO PSI 7" WELLHEAD CONNECIOR fLANGE i 2. 5000 PSI WIRELIN£ RAUS (VARIABLE SIZE) t 3. 5OD0 PSI 4 1/6" LUBRICA'I'OR ! 4. 5000 PSI 4 1/6" FLOW I*UBE PACK-OFF ! i DS 05-09A CTD Sidetrack Proposed Wellbore 4-1/2" x 3-1/2" XO 3011' 2234' 4-1/2" Camco Bal-0 SSSVN · 13-3/8" Shoe 2750' X Nipple 9864' Straddle Interval P&A'd w/ 17 ppg Cement 9-5/8" x 3-1/2" Packer 9836' FL4S Liner Top @ 9700' 3-1/2" & 9-5/8" Window @ 9900' 2-3/4" Open hole--~ Mechanical Whipstock Set @ -9900' 2-3/8" FL4S Liner Cemented & Perforated TD @ 11488' Shoot Cimulation Holes in 3-1/2" Tubing 9-5/8" x 3-1/2" Packer 10061' 4-1/2" Tubing Tail 10074' Existing Perfs P&A'd w/ 17 ppg Cement 9-5/8" Shoe 10217' 05-09 2234- SSV 2235 - 3012 - 3145 - 5942 - 8069 - 9155- 9598 - 9754 - 9837 - 9837 - 9865 - 9940 - 9959 - lOOOO- ZON-- 9970 - 9998 - 9998 - 10007 - ~ 002~ - 1002~ - soz 10220 - 102gO - 10225 - 10226 - APl: 500292025400 Spud: 07/05/77 PBTD: 10230.00 ftKB H2S: Orig Compltn: 07/26/77 Max Hole 39 deg @ 6550 Angle: SSSV Type: Last W/O: 06/01/90 Angle @ TS: 32 deg @ 9566 Annular Fluid: Diesel/SW Ref Log Date: 06/26/77 Angle @ TD: 32 deg @ 10230 Reference BHCS Last Tag Date: 01/17/99 Log: Last Tag: 10136 ELM Last Update: 01/20/99 Rev Reason: FISH RKB: 64 ft We! TyPe~ PROD KOP~ o:00 ftKB Date Note 01/18/99 Fish left = 6 slips from packoff slipstop AND two slips from Grapple that was set on GLM #8. TTL ELM @ 10061: ELM Tubing Tail (logged CR/Collar 2/21/93) Daterun: 7/26/77 Size I Weight Grade I T°PI atml Feetl Descripti°n 13.375 172.00 MN-80 I 01 27501 27501 Casing 19.625 47.00 N-80 I 01 102171 102171 Casing Size Weight Grade Top Btm Feet! Description 5.500 17.00 L-80 0 33 33 Tubing-PC 4.500 12.60 L-80 33 3011 2978 Tubing-PC 3.500 9.30 L-80 3011 10074 7063 Tubing-PC ~t~ MD TVD Man Mfr Vlv Vlv Type Vlv VIv Port Vlv Vlv Run Vlv OD Mfr Latch TRO Type 6 9753 9753 CA CA RCl-2 RK 0.188 3500.0 10/31/90 1.[500 Str MD TVD Man Mfr Vlv Vlv Type Vlv Vlv Port Vlv VIv Run Vlv OD Mfr Latch TRO Type 1 3144 3144 CA CA RD RK 0.000 0.0 01/01/60 1.500 2 5941 5941 CA CA RD RK 0.000 0.0 01/01/60 1.500 3 8068 8068 CA CA RD RK 0.000 0.0 01/01/60 1.500 4 9154 9154 CA CA RD RK 0.000 0.0 01/01/60 1.500 5 9597 9597 CA CA REED REP 0.000 0.0 01/01/60 1.500 Str MD TVD Man Mfr Vlv Vlv Type Vlv Vlv Port Vlv Vlv Run Vlv OD Mfr Latch TRO Type 7 9939 9939 CA CA RD RK 0.000 0.0 11/17/94 1.500 8 9997 9997 CA CA REED REP 0.000 0.0 01/01/60 1.500 Depth ID Type Description 33 0.000 XO Crossover 5-1/2" x 4-1/2" 2234 3.812 WSSSV 4-1/2" Camco BAL-O SSSV Nipple 3011 0.000 XO Crossover 4-1/2" x 3-1/2" 9836 0.000 SEALAS 3-1/2" Baker GBH-22 Seal Assembly 9836 0.000 PER 9-5/8" x 3-1/2" Baker DB Packer 9864 0.001 ~NIP 3-1/2" Otis X Nipple ID=2.813" 9958 0.000 i BL/JT 3-1/2" Blast Joints (Two20') 10006 0.000 BL/JT 3-1/2" Blast Joint (One 20') Behind Patch 10027 0.000 BL/JT 3-1/2" Blast Joint w/Carbide Rings (One 31') 10061 0.000 PER 9-5/8" x 3-1/2" Baker DB Permanent Packer 10070 2.560 NOGO 4-1/2" Otis XN Nipple ID=2.813" w/AVA Nip Reducer 10074 0.000 TTL 4-1/2" Tubing Tail Depth Comment 9997 Grapple & Part of Bowl on latoh (03/27/94) 9997 (10,025'md) slip of grapple-Part of Bowl not recovered. 10225 Grapple & Bullnose nut; Maybe in Patoh or GLM#3,4,6 Interval Zone Status Feet SPF Date Type Comment 9963- 9991 ZONE 2 C 28 4 11/05/77 IPERF 10008- 10020 ZONE 2 C 12 4 11/05/77 IPERF 10030- 10045 ZONE lB C 15 4 11/05/77 IPERF 10056- 10099 ZONE C 43 4 11/05/77 IPERF 1B,ZONE lA 10030- 10045 ZONE lB C 15 4~ 02/12/84 RPERF 10056- 10099 iZONE C 43 4 02/12/84 RPERF 1B,ZON E lA 05-09 34- SSV 2234 - !ii 3011 - XO ':i:' 3012 - 3144 - 3145 - 5942 - 8069 2 9155~ 9598 - .AS¥ ........................... 9864 - NI~ 9958- IL/JT ~ ............. ZON-- 1002~ - 10027- lOO ,- 10220 - FISH 10230 - 10225 - 10226 Interval Zone Status Feet SPF Date Type Comment 10092- 10099 ZONE lA C 7 4 05/24/88 APERF 10099- 10118 ZONE lA C 19 4 05/24/88 APERF 10030- 10045 ZONE lB O 15 1 02/05/89 RPERF 10074- 10118 ZONE O 44 4 02/05/89 RPERF 1B,ZONE lA 10118- 10125 ZONE lA O 7 4 02/05/89 APERF Interval Date Type Comment .,, 9963 - 9991 01/04/84 SQZ 10056 - 10099 01/04/84 SQZ 10056 - 10099 10/28/85 SQZ 10030 - 10045 07/03/88 STR 10056 - 10118 07/03/88 SQZ 10056 - 10118 02/04/89 SQZ Rig Sqz ARCO Alaska, Inc. Date: Feb 11, 1994 P.O. Box 100360, 0chorage, Transmittal #: 94021 AK Subject: From/Location: BHP Report John Degrey/ATO- 1529 Telephone: (907) 263-4310 To/Location: Distribution :/-0-'55 ~80- o% ~t-~% Well Log Date Tool Type Run, Scale Contractor Number (M-D-Y) 1-9 12-17-92 BHP - Camco 1-14 8-11-92 BHP - Camco 1-14 8-11-92 I BHP - i Camco 2-2 1-10-93! BHP - Camco 2-13 2-12-93 BHP - Camco 2-35 5-21-92 BHP - Camco 3-15A 3-20-93 BHP - Camco 3-20 12-18-92 BHP - Camco 4-7ST 5-17-92 BH P - Camco ,. 4-14 1-9-93 BHP - Camco 4-29 12-28-92 BHP - Camco 4-42 4-27-92 BHP Camco 5-9 2-21-93 BHP Camco 5-16 2-21-93 BHP - Camco 5-25 2-21-93 BHP - Camco 5-31 2-21-93 BHP - Camco 5-33 1-29-93 BHP - Camco 5-35 1-29-93 BHP - Camco 5-36 1-29-93 BHP - Camco 9-24 2-15-93 BHP - Camco 9-40 1-25-93 BHP - Camco 9-51 3-20-93 BHP - Camco 12-7A 12-6-92 BHP - Camco 12-7A 12-10-92 BHP - Camco 12-9 12-10-92 BHP - Camco 12-29 12-14-92 E3H P - Camco 13-15 7-3-92 BHP - Cam(x) 13-20 7-4-92 BHP Camco 13-23A 7-4-92 BHP Cam(~ 13-32 7-3-92 BH P Camco 14-11 11-23-92 BHP - Camco 16-19 10-19-92 BHP - Cam(~ 16-21 10-19-92 BHP - Camco 16-30 9-28-92 BHP - Camco 17-3 12-12-92 BHP - Camo3 17-10 11-8-92 BHP - Camco 17-11 2-8-93 BHP - Camco 17-20 12-21-92 BHP - Camco 17-21 12-21-92 BH P - Camco 18-15 6-14-92 BHP - Camco ARCO ~ Irt¢, I$ · ~ubIl~Iary of Alla~l¢ltlchlbidC~ RECEIVED FES I< 19 q Alaska Oil ~ Gas Cons. Anchorage C°rrgai$$ion ARCO .A.I~sk9, hc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: REFERENCE: 6-9-93 ~-_~~.~1-7 5-6-93 Static Press~ Run 1, 5" . Sch ~_._~.~_~1-14 5-8-93 Prod Profile Run 1, [~' Sch -20 5-10-93 Production Run 1, 5" Sch ~lSA 5-11-93 CBT/New TBG/Jewelry Run 1, 5" Sch ~3-19 5-10-93 Leak Detect/Spin/Temp/Press Rnn 1, 1~' & 5" Sch ~-~-~..__ _3-36 5-4-93 USIT (Cement & Corrosion) (Color) Run 1, 5" Sch 5-3-93 InJ Proflle/Spin/Temp/Press Run 1, 5" Sch 5-2-93 Inj Profile/PITS thru 1, 5" Sch 91 4-24-93 Leak Detect/Spin/Temp/Press Run 2, 5" Sch 4A 5-7-93 D-_~! Burst/TDT-P (Borax) Run 1, 5" Sch ~22~2~ 5-6-93 Vertilog Run 1, 5" Atlas 5-8-93 GR/Collar Run 1, 5" Atlas -~~9-5A 5'6-93 Pelf Record ' Run 1, 5" Sch ~~31A 5-7-93 GR/CCL thru 1, 5" Sca -,~~9-:2 5-10-93 CNL Run 1' 5" Sch 17-19 5-9-93 TDT-P (Borax) Run 1, 5" Sch ~~7-21 5-3-93 Leak Detect/Spin/Temp/Press Run 1, 5" Sch ~o-~-x 5-3-93 Pelf Record Rim 1, 5" Sch -~'~~8-16A 5-4-93 Production Run 1, 5" Sch 8-29A 5-5-93 CCL/PerfRecord thru 1, 5" Atlas 8-29A 5-8-93 SBT/G~~ Run L 5" Atlas ~ ]~q0GI-4 5-7-93 GR/CCL (Color) l~m 1, 5" Sch ~~AGI-5 5-10-93 GR/CCL (Color) Run 1, 5" Sch ~.~1~d3I-6 5-10-93 GR/CCL (Color) Run 1, 5" Sch ~AGI4 5-3-93 SIYI'/GR/CCL Ibm 1. 2" & (Y' Atlas Please sign and return the attached copy as receipt of data~ R E CE IV ED B ~__._~.~.~ Have A Nice Day! ~ Sonya Wallace ~ w/ ~'?~'~ APPROVED ~ ATO-1529 %. C/4/~ "/~-.Trans# 9306~ .... # CENTRAL FILES ~2o~ ~ # PHILLIPS # CHEVRON ~* "?~,. PB WELL FILES # CLINT CHAPMAN '"'~x # BPX # EXXON '~ # MOBIL # STATE OF ALASKA ARCO ,~l~skn; Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 3-22-93 REFERENCE: ARCO CASED HOLE FINALS ~1 ~-IB 2-9-93 Prod Prome ~_m l, '~ ~1. 25 2-9-93 Prod Profile l~m 1, 22 2-21-93 Prod Profile Run 1, 2-2.o~93 Prod Profile Run 1, 1-24-93 Alpha Patch CCI, l~n 1, 2-21-93 GR/Collar l~_m 1, 2-21-93 InJ Profile ' l~_m 1, 1-25-93 Static Tem__p Run 1, 2-20-93 GR/Collar Run 1, 2-2(b93 Prod Profile Run 1, 4ST 2-11-93 Prod Profile Run 1, Please sign and return the attached copy as receipt of data. RECEIVED BY_~__~_~ Have A Nice Dayl Sonya Wallace ATO-1529 Cslnco Camco Camco Ch_moo Camco C~__mco Camco Camco Camco C~_mco Cs_ moo Camco Camco Camco # CENTRAL FILES # CHEVRON D&M # LUCILLE JOHNSTON # EXXON MARATHON # MOBIL # PI-~.LrPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO The correct well name for this log is 1-1B. RECEIVED MAR 2 6 1993 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ....... ALASKA . AND GAS CONSERVATION Cf. AISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging ,,,, Pull tubing .. Alter casing Repairwell Perforate Other X 2. Name of Operator ARCQ Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2546' FSL, 210' FWL, Sec. 32, T11N, R15E, UM At top of productive interval 1626' FSL, 1629' FEL, Sec. 32, T11 N, R15E, UM At effective depth 1437' FSL, 1365' FEL, Sec. 32, T11 N, R15E, UM At total depth 1421' FSL, 1341' FEL, Sec. 32, T11 N, R15E, UM 5. Type of Well Development X Exploratory Stratigraphic . Service 6. Datum of elevation(DF or KB) 64 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 5-9 9. Permit number/approval number 77-34/90-110 10. APl number 50 - 029-20254 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10230 feet 9045 feet Effective depth: measured 10176 feet true vertical 8999 feet Casing Length Size Conductor 110' 20" Surface 2646' 13-38" Production 10153' 9-5/8" Plugs(measured) Junk(measured) Cemented 281 sx Permafrost 5000 sx Arcticset 1100 sx CI 'G' & 300 sx AS I Measured depth 110' 2710' 10217' RECEIVED True vertical depth 110' 2710' 9034' Perforation depth: measured 10030-10045'; 10074-10125' true vertical 8875-8888'; 8913-8956' [)EC 11 1990 Alaska Oi) & Gas Cons. bommissi¢~ Anchorage Tubing (size, grade, and measured depth) 4-1/2", 12.6:~, L-80, IPCT @ 3011' MD; 3-1/2", 9.3#, L-80, IPCT @ 10074' MD Packers and SSSV (type and measured depth) Baker DB packer @ 9836' MD; Baker DB packer @ 10061' MD; 4-1/2", Camco Bal-0 SSSV @ 2234' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Shut in for tubing patch. Shut in for rig workover. Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date ) ~'//O/~ (-3 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DS 5-9 TUBING PATCH INSTALLATION DESCRIPTION OF WORK COMPLETED 3/2/90 ' RIH & set a 2.25" ID nipple reducer in XN nipple at 10078' MD. POOH. RD. 3/4/90 - RIH w/a 3.75" OD x 3.25" ID tubing patch. Patch stuck in tubing above set point, & could not be pulled free. Left fish in hole at 9965' MD.. RD. 3/10/90- RIH & attempted to jar patch loose. No success. POOH. RD. Shut-in well for a Rig Workover to replace leaky tubing. The Rig Workover was completed 5/31/90, & was reported on a separate Report Sundry (Aprvl# 90-202). RECEIVED Anchorage STATE OF ALASKA AL~,SKA OIL AND GAS CONSERVATION COMM,..,~ION REPORT OF SUNDRY WELL OPERATIONS V 1. Operations Performed: Operation Shutdown__ Stimulate Plugging __ Perforate __ Alter casing X Repair well Pull tubing X Other ){ Workover 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Development ARCO Alaska. Inc. Exploratory __ 64' RKB feet 3. Address Stratigraphic __ 7. Unit or Property name P. O. Box 100360, Anchorage, AK 99510 Service X Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2546' FSL, 210' FWL, Sec. 32, T11N, R15E, UM At top of productive interval 9. Permit number/approval number 1626' FSL, 1629' FEL, Sec. 32, T11N, R15E, UM 77-34/90-208 At effective depth 10. APl number 1437' FSL, 1365' FEL, Sec.32, TllN, R15E, UM 50-029-20254 At total depth 11. Field/Pool Prudhoe Bay Field 1421' FSL, 1341' FEL, Sec. 32, T11N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 1 0230' feet Plugs (measured) None true vertical 9045' feet Effective depth: measured 1 01 76' feet Junk (measured) None true vertical 8999' feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 80' 20" 281 sx PF cmt 1 1 0° 1 1 0' Surface 271 0' 1 3-3/8" 5000 sx AS cmt 271 0' 271 0' Intermediate Production 1 01 96' 9-5/8" 1100 sx Class G & 1 021 7' 9034' Liner 300 sx AS I Perforation depth: measured 10030'-1 0045', 1 0074'-10125' true vertical 8875'-8888', 8913'-8956' Tubing (size, grade, and measured depth) 4-1/2"/3-1/2", L-80, tbg w/ tail @ 10074' '"~° ~' '~'' iX il ~_' Packers and SSSV (type and measured depth) ~ ~-- ~ ~.~ -- Camco 'Bal-O' sssv @ 2234', Baker 'DB' pkrs @ 9836' & 10061' 13. Stimulation or cement squeeze summary ~'~ ~. ~ N/A Intervals treated (measured) .' ~::i~:.~.. ~j~ .~ ~,~ ~0.1]$. Treatment description including volumes used and final pressure 14, N/A Reoresentative Daily Averaoe Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments *Workover Well History 16. Status of well classification as: Copies of Logs and Surveys run ~ Daily Report of Well Operations X* Oil Gas Suspended Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~ev~"~LJ C~~ Title Drillin~ Analyst Date Form 10-404 ~ 05/17/89 SUBMIT IN DUPLICATE ARCO OII and Gas Company Well History - Initial Report- Daily In~lmcllmta: Prepare and ~bmlt tl~ '~IMIIM' flel~l" on the fl~ Wednesday after a well is spudded or workover operations are sis,ed. Dally wO~',~b~ ~ ~~,~ ~mmaHzed on the ~rm giving inclusive dst .... ly. ~ Count. parish or ~rough District ~CO Field ~O~ Lease orU,~t ~: 28326 ~uth. or W.O. ~'S3692 ~;m* ~O~O~R State Jw~°'5_9 API: 50-029-20254 I^RCO W.~. 21. 0000 Prior status if a W.O. Operator ARCO Spudded or w.O.AcCEPTbegun IDate 05/24/90 IHOur Date and depth Complet ...... df ..... h d[~po~e~ as of 8:00 a.m. AUDI 05/24/90 ( TD: 0 PB:10176 SUPV:GLC 05/25/90 ( TD: 0 PB:10176 SUPV:GLC 05/26/90 ( TD: 0 PB:10176 SUPV:GLC 05/27/90 TD: 0 PB:10176 SUPV:GLC 05/28/90 (:i PB:10176 SUPV:GLC 05/29/90 ( ) TD: 0 PB:10176 SUPV:GLC 05/30/90 .( ) TD: 0 PB:10176 SUPV:GLC The above is o~rrect '~ ~ For form preparation and distribution, see Procedures Manual. Section 10, Drilling, Pages 86 and 87. 0200 HRS 1) BLEEDING GAS F/ ANN 9-5/8"@10217' MW: 8.5 FSW RD & MOVED TO DS 5-9. ACCEPT RIG @ 0200 HRS., 5/24/90. RU HARDLINE & LUB. PULLED BPV. RU LINES TO T~ & ANN. TSTD KILL LINES & BLED TBG GAS. DAILY: $11,270 CUM: $11,270 ETD:SO EFC: $11,270 2) POOH W/ 4-1/2 COMP 9-5/8"610217' MW: 8.5 FSW BLEED ANN & TBG GAS. BULL HEAD & CIRC FSW TO KILL WELL. SET BPV. ND TR~E. NU BOPS & TEST SAME. PULL TBG HNGR FREE. TEST 9-5/8" PACK OFF. CBU. LOSING FLUID @ 30 BPH. POOH W/ 4-1/2 COMP ASSY. DAILY: $88,528 CUM: $99,798 ETD:SO EFC: $99,798 3) CBU 9-5/8"610217' MW: 8.5 FSW POOH W/ 4-1/2" COMP. C/O RAMS & TEST SAME. MU FTA #1 & RIH ON 3-1/2 DP. CBU. ENGAGE HB RET PACKER. RELEASE BY ROT & STRAIGHT PULL. WORK PKR & CBU. DAILY: $26,594 CUM: $126,392 ETD:SO EFC: $126,392 ) CBU 9-5/8"610217' MW: 8.5 FSW CIRC ~UT GAS. POOH W/ HL PACKER. LD STRADDLE ASSY & INSPECT SAME. MU REP & RIH TO 9916. CIRC PRIOR TO SETTING , ~ ~i:~i?~.~ i~ZLY: $$5,139 CUM: $161,531 ETD:SO EFC: $161,531 N/ RBP 9-5/8 @10217' MW: 8.5 FSW ~.~_EMPT TO SET RBP @ 9925'. NO TEST. RESET @ 9665'. TEST ~ ~?~!~*~!~:~9~$~8w CSG TO 3000 PSI. POOH 2 STDS & SET STORM PKR. ND ~'~S C/O 9-5/8" PO & TBG HD. TEST SAME. NU & TEST BOPS. RET STORM PKR. WORK OVER RBP. REP NOT FUNCTIONING PROPERLY. POOH W/ RBP. RIH W/ TEST PKR. DAILY: $31,255 CUM: $192,786 ETD:SO EFC: $192,786 POOH W/ DUMMY SEAL ASSY 9-5/8"610217' MW: 8.5 FSW TIH W/ TEST PKR. TEST 9-5/8" CSG @ 9904' TO 3000 PSI. POOH W/ PKR. R/U W-LIN E. PULL AVA RED NIPPLE. RIH W/ MOD AVA RED NIPPLE. SET IN 4-1/2" TAIL PIPE NIPPLE. POOH & RD W-LINE. RIH W/ DUMMY SEAL ASSY. STING INTO "D" PKR @ 10070'. TEST RED NIPPLE & PKR TO 3000 PSI. POOH W/ DUMMY SEAL ASSY. DAILY: $43,381 CUM: $236,167 ETD:SO EFC: $236,167 RU ~TO RUN COMP STRING 9-5/8"610217' MW: 8.5 FSW CONT POOH W/ DUMMY SEAL ASSY. PU STRADDLE ASSY & RIH ON DP. BRK CIRC. STING INTO ISOL PKR @ 10061'. SET DB PKR @ 9835'. TEST ANN. POOH & LD SETTING TOOL. HOLD SPCC DRILL. LD DC'S & CLEAR FLOOR. PULL WEAR BUSH. DAILY: $30,742 CUM: $266~ 909 ETD:SO ~FC: S266: 90q ~dmno SuPt INumber all dally well history forms consecutively las they are prepared for each well. I Page no. ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit t~,-~ll~iila~l~lmll~' on the first Wednesday after allowable has been assigned or well ia Plugged, Abandoned, or Sold. "Final Report" should be subrnttte~~Uona are suspended for an indefinite or appreciable length of time. On workovers when an official test is not requ red upon completion, report ~~l)lltl~l~aelttatlve test data in blocks provided, The "Final Report" Iorm may be used for reporting the entire operation if space is available~ i- ' · : ~?~ . Accounting cost center code District ~1:~,CO A~,~S[I~j~ T~e ICounty or Parish NORTH SLOPE state AK JL ...... Unit ADL 28326 Iwe~°' 5-9 Field VRUDHOE : Title WORKOVER Auth. or W,O, noAS3692 Operator ~a~R,C O A.R. Co. Spudded or W.OA~;W~pT Date API: 50-029-20254 W.l. 21.0000 05/24/90 Iotalnumber of wells (active or inactive) on this est center prior to plugging and I bandonment of this well I our 0200 HRS IPrlor status if a w.o. I Date and depth as of 8:00 a.m. Complet .... ord f~[J~c~ d~.r~oo{~e~ 05/31/90 (8) TD: 0 PB:10176 SUPV:DAC 06/01/90 (9) TD: 0 PB:10176 SUPV:DAC NU TREE 9-5/8"610217' MW:'-8.5 FSW RU & RUN 3-1/2 X 4-1/2 COMP ASS~. TEST CIM LINE. SLIP DRL LINE. CONT TO RIH W/ COMP ASSY. MU SSSV & TEST LINES TO SAME. STING INTO PACKER. SPACE OUT & LAND TBG HNGR. RILDS. FRZ PROT TO 3144' W/ DIESEL. TEST TBG. LNDG JT LEAK. ND BOPS. SET BPV & NU TREE. (CAMCO 'BAL-O' SSSV @ 2234', BAKER 'DB' PKRS @ 9836' & 10061', & TT @ 10074') DAILY:S70,304 CUM:$337,213 ETD:SO EFC:$337,213 RIG RELEASED 9-5/8"610217' MW: 8.5 FSW NU TREE. TEST SAME. TEST TBG TO 3000 PSI FOR 30 MIN. TEST CSG TO 3000 PSI FOR 30 MIN. SET BPV. SECURE WELL. RELEASE RIG @ 11:00 HRS 5-31-90. DAILY:S230,460 CUM:$567,673 ETD:SO EFC:$567,673 Old TO I New TD I Released rig I Date I Classifications (oil, gas, etc.) Producing method Potential test data PB Depth Kind of rig IType completion (single, dull, etc.) JOfficial r~servoir name(s) Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length ....Choke si~ze - T.P. · , C.P. · Water % GOR Gravity Allowable Effective data corrected For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87, AR3B-459-3-C INumber all daily well history forms consecutively as they are prepared for each well, jPage no. Dlvldon of AtlantlcRIchfleldCompany A' (A OIL AND GAS CONSERVATION COMi .~ION APPLIGATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon_ Suspend _ Operation Shutdown _ Re-enter suspended well_ Alter casing _ Repair well ~ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing X Variance _ Perforate _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Development .~X ARCO Alaska. Inc. Exploratory _ RKB 64' feet 3. Address Stratigraphic _ 7. Unit or Property name P. O. Box 100360, Anchorage, AK 99510 Service _ Prudhoe Bay Unit 4. Location of well at surface $. Well number 2546' FSL, 210' FWL, Sec. 32, T11N, R15E, UM 5-9 At top of productive interval 9. Permit number 1626' FSL, 1629' FEL, Sec. 32, T11N, R15E, UM 77-34 At effective depth 10. APl number 1437' FSL, 1365' FEL, Sec.32, TllN, R15E, UM 50-029-20254 At total depth 11. Field/Pool Prudhoe Bay Field 1421' FSL, 1341' FELr Sec. 32r T11N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 10230' feet Plugs (measured) true vertical 9045' feet None Effective depth: measured 1 01 76' feet Junk (measured) true vertical 8999' feet None Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 80' 20" 281 sx PF cmt 1 10' 11 0' Surface 2710' 13-3/8" 5000 sx AS cmt 2710' 2710' Intermediate Production 10196' 9-5/8" 1100 sx Class G & 10217' 9034' Liner 300 sx AS I Perforation depth: measured 10030'-10045', 10074'-10125' R~C~/~I-.0 true vertical 8875'-8888', 8913'-8956' ji\~,~ ~-- ~", 'i r';~7~.3.'.,~ Tubing (size, grade, and measured depth ~':: '.e~'2 0i~ & ~5S 4-1/2", L-80, w/tail @ 10082' ;.~.~.~.~ Packers and SSSV (type and measured depth) Baker 'HB' & 'DB' pkr @ 9890' & 10070', Camco 'BAL-O' sssv @ 2231' 13. Attachments Description summary of proposal ~ Detailed operation program ~ BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: M~,y 1. 1990 Oil X Gas __ Suspended _ 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed l,,~'~Z~ ~)J..C~ Title Drilling Analyst Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness IApproval No. Plug integrity ~ BOP Test~ Location clearance ~/ /~ I ,~ ~ Mechanical Integrity Test ~ Subsequent form require ~R~GtNAL SIGNED 9Y' LONNIE C. SMITI~t the order of the Commission Commissioner Date y- ~'-~' Approved by Form 10-403 Rev 06/15/88 SUBMIT IN TRIPI'ICATE 13-5/8" 5000 PSi BOP STACK I I ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING 1.13-3/8" CASING HEAD 2. 5000 PSI TUBING HEAD 3.13-5/8" - 5000 PSI PIPE RAMS 4. 5000 PSI DRILLING SPOOL 5.13-5/8" - 5000 PSI BLIND RAMS 6. 13-5/8" - 5000 PSI PIPE RAMS 7. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR (~APACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSi DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STA(~K TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSi AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPEBA. TI~LS~ERFORM COMPLETE BOP TEST EVERY 21 DAM 11/20/89 BOP SCH (FOR: NAB 2ES) WORKOVER PROCEDURE PRUDHOE BAY DS 5-9 Objective: The objective of this workover is to pull the 4-1/2" tubing and retrieve the top Baker 'HB' retrievable packer and the leaking 4-1/2" straddle assembly. The straddle assembly will '.contain a failed, Teledyne-Merla tubing patch. In preparation for installation of a treater string, ,the existing FMC Gen I, two-port tubinghead will be replaced with a four-port tubinghead. A · 3-1/2" straddle assembly consisting of 60', 3-1/2" steel blast joints, 31', carbide blast rings, two · 3-1/2" gas lift mandrels, one 3-1/2" profile nipple, and a 9-5/8" x 3-1/2" permanent packer will then be run on a 3-1/2" x 4-1/2" tapered tubing string. The completion assembly will incorporate a single, 3/8" OD treater string, six, 3-1/2" x 1-1/2" Camco gas lift mandrels, and a re-run 4-1/2" Camco WLSSSV. The FMC Gen I Retrofit 5-1/2" tubing hanger will be replaced with a similar, four-port tubing hanger. All applicable equipment will be inspected and re-run where possible. . RU slickline. RIH and pull dummy valve from GLM at 9908' MD in straddle. RIH and pull equalizing dummy valve from GLM at 9600' MD above top packer. RD siickline. , MIRU workover rig. Bullhead seawater down tubing and annulus to kill well. Ensure that well is stable or taking fluid at a manageable rate. Total fluid lost on previous workover = 780 bbls. , Set BPV. ND 5-1/2" tree and FMC Gen I tubinghead adapter. NU 13-5/8" 5M BOP stack. Pull BPV. Install test plug. Test BOP's to 5000 psi. Test 13-3/8" packoff. Packoff will probably not hold pressure without some bleed off, however, it should still pass a 30 minute test with less than 10% bleed off. Pull test plug. . Engage FMC Gen I Retrofit 5-1/2" tubing hanger with 5-3/4" RH Acme landing joint. PU on 5-1/2" tubing to insure that seals are free. Circulate bottoms up. POOH, LD tubing hanger and 5-1/2" Mod LTC pup joint. Continue to LD 4-1/2" MOD BTC tubing, GLM's, and seal assembly. Tubing, SSSV, and seal assembly will be inspected and re-used where possible. , RIH w/PBR retrieving tool and retrieve Baker 'HB' packer and PBR and 4-1/2" straddle assembly. Packer will release with righthand rotation or 66,000 lbs upward strain. If packer cannot be released, the tubing below the packer will have to be jet-cut to allow the packer mandrel to rotate. 6. MU 9-5/8" RTTS and RIH to 9925' MD. Set RTTS and pressure test the 9-5/8" above the R'I-rS to 3000 psi for 30 min. Attempt to locate any leaks in the 9-5/8". . MU 9-5/8" RTTS w/storm valve on DP and set packer below tubinghead with full string of DP hung off below. Replace the two-port FMC Gen I tubinghead with a four-port Gen I tubinghead and test to 5000 psi. Replace and test 9-5/8" mandrel hanger packoff. Retrieve RTTS and storm packer. POOH, LD R'I-rS. Se Se 10. 11. 12. 13. RU slickline. RIH w/dummy tool string to 10,100' MD (below lower packer tail). POOH. MU AVA 3.725" OD x 2.560" ID reducer nipple for Otis 4-1/2" 'XN' nipple, 3.813" ID, 3.725" No-Go. RIH and set reducer nipple in Otis 'XN' nipple at 10,078' MD. RIH and set positive AVA plug in reducer nipple profile. RD slickline. RIH w/dummy packer seals for lower Baker 'DB' packer. Sting into packer with DP open. Pressure test packer seals and plug in reducer nipple to 3000 psi. Slowly sting out of packer. Circulate clean. Displace well with inhibited seawater. POOH, LD DP. MU 9-5/8" Baker 'SB-3A' permanent packer with 3-1/2" straddle assembly and seal assembly for lower packer and RIH on +6900', 3-1/2" 9.3g L-80 MOD 8rd IPC tubing and +3000', 4-1/2" 12.6# L-80 MOD BTC tubing. Run 2, 3-1/2"x1-1/2" GLMs in the straddle section and 6, 3-1/2"x1-1/2" GLM's above the top packer. The straddle assembly will also contain 60' of 3-1/2" steel blast joints and 30' of carbide blast rings. An Otis 3-1/2" 'RHC' plug should be run in the 3-1/2" 'XN' nipple in the straddle section. A single, 3/8" OD treater string will also be installed. Sting into the lower packer and space out with 4-1/2" pup joints. MU FMC 5-1/2" Gen I Retrofit tubing hanger with 10', 5-1/2" 17# L-80 MOD LTC IPC pup joint on top of 4-1/2" tubing. Sting seal assembly into lower packer and land tubing hanger. RILDS. Drop ball and pressure tubing to 3000 psi to set 'SB-3A' packer. Bleed pressure. BOLDS. PU on tubing to shear seal assembly from top packer. Re-land tubing. Pressure test tubing and annulus to 3000 psi f/30 minutes. Release pressure, set BPV. ND BOP's. NU FMC Gen I 13-5/8" x 7-1/16" 5M tubinghead adapter and 5-1/2" 5M tree. Pull BPV, install tree test plug. Test tree to 5000 psi. Retdeve test plug. Freeze protect top 3000' of tubing and annulus through 3/8" orifice/check valve in top 3-1/2" GLM station. Set BPV. 14. Release rig. Retrieve'RHC' plug. o BHP = 3700 psi @ 8864' TVD (8.1 ppg) Workover Fluid -- 8.5 ppg Seawater ARCO ALASKA, INC~ P.O. BOX ANCHORAGE ~ ALASKA 995~ DATE · S- ~ '5-9¢ RFF:'E:RENCE: ARCO CASED HOLE FINALS ~ '-'S S .... I ~:)-"9~'3 COLLAR/PE:RF ~ '-7 S-9-9~,') COL. LAR/PERF i-24 3-4 .... 9~ COL. LAR t '-S4 t i '-i '7-89 F'IT2 3-28 i 0-' t 3"'89 EF'I LOG 5-9 3-:3-9~ COLLAR t i-3 3-5-90 COLLAR/PERF' t 4-~9 2-27-~ PRODUCTION i5-t i2-'3i'"8~ GAHH~ I)SN i S"'i ~ 3-t "'~ DU~L BURST TDT-F' t -t-~ 3--9-9~ CC)LLAR WGI-S S--6--9~ CBT WGI--S S-.6-'9~ CEI' R LJN i, .5 RUN t , 5" RUN t , 5 ' RUN RUN i, 5 ' RUN t , 5' RUN i, RUN i, t'&5" RUN i , 5" RU~ RUN RUN RUN PI_EASE SIGN AND RETURN THE A'FTACHED COPY AS RECEIF'T OF DATA, AI'L..AS ATI_AS; A'I'I...AS C A M C O A'T'L.A$ A'l'l.. A,.S' ATI_A,S' $CH S C H ATt. A,S' SCH SCH DISTRIBUTION T~ CENTRAL FILES ~ CHEVRON D & M · .~ EXTEN,S'ION EXPLORATION · ,,."" EXXON MARATHON ~ MOBIL F'H I I_L I F'.";' PB WELL F'ILES R & D' BF'X STATE OF AL. ASKA TEXACO ARCO Alaska, In~ Prudhoe Bay Engineering Post OffiCe Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager February 12, 1990 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 5-9 Permit No. 77-34 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-r, eferenced well. Sincerely, D. F. Scheve DFS/CMH/jp ~ . Attachment cc: J. Gruber, ATO-1478 PI(DS 5-9)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA )IL AND GAS CONSERVATION ( AMISSION ALASK ~? ~ ~ ':~!~! i~ ~'~ APPLICATION FOR SUNDRY AI-'PROVALg3 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate __ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development X Exploratory __ Stratigraphic Service 6. Datum of elevation(DF or KB) 64 RKB 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 2546' FSL, 210' FWL, Sec. 32, T11N, R15E, UM At top of productive interval 1626' FSL, 1629' FEL, Sec. 32, T11 N, R15E, UM At effective depth 1437' FSL, 1365' FEL, Sec. 32, T11N, R15E, UM At total depth 1421' FSL, 1341' FEL, Sec. 32, T11 N, R15E, UM 8. Well number 5-9 9. Permit number 77-34 10. APl number 50 - 029-20254 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10230 feet Plugs(measured) 9045 feet Effective depth: measured 10176 feet true vertical 8999 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 281 sx Permafrost 110' 110' Surface 2646' 13-3/8" 5000 sx Arcticset 2710' 2710' Production 10153' 9-5/8" 1100 sx CI 'G'& 300 sx AS I 10217' 9034' Perforation depth: measured 10030-10045'; 10074-10125' true vertical 8875-8888'; 8913-8956' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, IPCT @ 10082' MD Packers and SSSV (type and measured depth) Baker HB Hyd packer @ 9890' MD; Baker DB packer @ 10070' MD; 4-1/2", Camco Bal-0 SSSV @ 2231' MD 13. Attachments Description summary of proposal ~ Detailed operations program BOP sketch x 14. Estimated date for commencing operation February 1990 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby-certify that the fore_goin~ is true and correct to the best of my knowledge. Signed "~¢~_',~,,~~ Title Operations Engineering Manager 15. Status of well classification as: Oil x Gas Suspended I Approval No. ¢ ~, __/,,/ O FOR COMMI~;ION U~E ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- Approved by order of the Commissioner ORIGINAL S~GNED BY LONNIF C SMITH Commissioner Date Form 10-403 Rev 06/15/88 Approved Copy .Returned SUBMIT IN TRIPLICATE DS 5-9 Patch Installation Procedure P16472-Downhole Maintenance Obiective: To install tubing patch assembly across tubing leak at 10030' ELM. 1. RU WLU, test lubricator, and pull SSSV. Make gauge/dummy run through 5-1/2"x 4-1/2" tubing to + 10100' md. The OD of the Teledyne patch to be run is 3.750" and the overall length is + 20'. Teledyne can furnish dummy assembly, if needed. Run smaller gauge through XN landing nipple (3.725" ID) at 10078' md to insure clearance for nipple reducer. 2. Replace orifice valve in GLM @ 10021' md with dummy. 3. Set AVA "SEL" nipple reducer (2.250" ID) in XN nipple at 10078' md. POH. RD WLU. 4. RU electric line unit, test lubricator and run Teledyne Merla tubing patch (3.75" OD x 3.250" ID). Run tie in log from +10070' to _+ 9800' md and correlate log with Halliburton Production Profile log run 1-27-90. 5. Set patch across leak at 10030' ELM (HRS production log dated 1-27-90) using 3- 1/4" Teledyne multi-stage setting tool. POH and RD ELU. 6. Return well to production and test. Absence of high GOR should indicate patch is holding. Well Data SBHP: 3669 psi est @ 10016' md ( 8800' SS ) SBHT: 185° F @ 10016' md Tubing: 5-1/2", 17ppf x 4-1/2", 12.6ppf Min ID: 3.725" @ 10078' md- Otis XN landing nipple Tubing capacity to bottom perfs at 10125' BHCS = 157 bbls Hole angle at 10030' md = _+ 32.25° Max deviation : 39.0° @ 6419'-6607' md H2S: 4 ppm (11-89) Spucl Date: 7.5,77 Arc~o' Ala~a Inc. * Pruclhoe Bay Aeld · 50.029-202544~ ~ '-- Type: Pro¢lucer Completion Date: 2-6.89 New I~ Workover ~ ~dglnol RKB: 64' Hanger Type: Oct ~p of Socllerochlt: 956~ Maadmum Hole Angle: 39e Annulus Fluid: Diesel/Seawater Reference LoG: A Itl :l MD Ia Tol:) of lcldPfl~nf. 1 ~ ~' Gram arm ~1~-1~ 3,4 12 $ 6 7,13 9 11 2 2231' 9874' 989(7 1aa~ 1C~8' l~r~_l' 1OO62' Hanger: 19' Angle Through SacI.: 32' BI-IC~ 7-18-77 4 1/2' ~c/nc~ BaFo ~ ~ I0=3.821' Bakm~ PBR Bal~ ~' ~ ~ Bc:lk~ 190,47 'OB' PIm ~ ot~ 'x~ I~e ID-3.72S ~ g'mar Out Sul:) Tut~n~ Td 4-1/2' truing ami T~ 13 3/8' 72~ 9 $/8' 47d~ 5 1/2' 17~ 4 1/2' 12.6d~ MN-aO 0 275O' ~ ~ 0 1C~17' Codng LeO 0 3,1' I~ Tubing LeO 33' 1CX~82' IPC Tubing mlxlabd: ) MC~ MC ORIF RK 3/8' MC-FMHO MC DUM RK MC-FMHO MC DUM RK MC~ MC DUM RK MC~ Meda EQD~M RK MC~ MC DUM TKE MC-FMHO MC ORI RK 5/16' . 3134' (3131') 1 ~ ('ru~ 2 ~ C72G1') a 91d4. (8122') 4 91~0 Csslr) S 99G8' (8772')6 ~~ 2 ~ o 2.ee mg sqz 1 ~L'~_ I(X~0 2 12 0 2-~9 Rig ScIz 101330,1G::145 10 15 1/2 2-649 Rpeff 1gG56-1CX374 I! ~ 0 ~ I~ SClZ 1(1:174,,10125 lB 51 4 2-5-89 Aperl'll~ P81D - 10176' 10- 1023l~ Dall. rn 87~= ~~ 88~0'SS = 9998' MO ~ I~te: 1-22-90/by MI I~:I~ Ped dc~ con~'ttorl ~ ~o~ 2-~-~ 6 5 4 3 2 COILED TUB[Nt~ UNIT BOP EOU ! PHENT 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 3 J 2 H]REL INE BOP EOU ! PHENT 1. 5000 PSI ?" W£LLHEAD CONN£CIOR IrLANG[ 2. 5000 PSI WIR£LIN£ RAMS (VARIABLE SIZ£) .3.5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUB[ PACK-OFF !-7 F' F' !.'--_' R E N C F ' A F.: C 0 C A i..~ E g H 0 L E F'" l N A L. F'I..EAZ[" ;~.']:GN AND RETURN THE ATTACHED C:OF'Y A2 !;.'.EC:EII::'T 01-' DATA. D I STR :[ BU'T' ]: ON :~ CiE N -r, R. A L ~l: CHEVRCJN i'-"B WEI_L. F]:LE£ · - D .~.. M R ~. D · .- EXTENSION EXPLORATION ~- ~-:,' F' X '~' EXXON · ~ ;i':."i" A TIE O F ~ L A ~' K A N A R A T H O N '~ MOBIL OIL AND GAS CONSERVATION COMI ')N REPOR, OF SUNDRY WELL OPt r TIONS 1. Operations performed. ODeratton ~'tutclown ._. Pull ruing .,.._ AJter casing .._ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, A[ 99510 ,, Stimulate __ Plug~ng Rel:~r w~l __ 5. Type of Well: Development Exploratory Stratigral:m*c Serwce R15E, UM R15E, UM R15E, UM feet Plugs(measured) feet 4. Location of welt at sudace 2546' FSL, 210' FWL, Sec. 32, TllN, Ri5E, UM At top of proOuctive interval 1626' FSL, 1629' FEL, Sec. 32, TllN, At effective depth 1437' FSL, 1365' FEL, Sec. 32, TllN, At total clepth 1 .21' FSL. 1341' FEL Sec 32, TI1N, 12. Present well conclibon summary Total depth: measured 10230 true vertical 9045 Pedorate __ Pull tul:xng __ Other 6. Datum e~evat,on (DF or KB) 64' RKB ' '7. UniLor pr, gperty name ~ruanoe Bay Unit 8. Well numOer 5-9 9. Permit numbeflapp['oval numC)er 10. APInuml~ ' ' 5O-- O29-2O254 11. Field/Pool Prudhoe Bay Oil Pool Effective ctepth: measured 10176 feet true verbcal feet 8999 Casing Length Size J u nk (measured) Cemented Measured depth True vertical depth feet Conductor 80' 20" Surface 2686' 13-3/8" Production 10153' 9-5/8" 281 sx Permafrost llO' ll0' 5000 sx Arctic Set 2750' 2750' 1100 sx Class G 10217' 9034' Pedoration depth: measured None true vertical None Tubing (size, grade, and measured depth) 4½", N-80, tubing f/9207-9326' MD, Packers and SSSV (type and measur~ depth) Camco 13. Stimulatioh or cement squeeze summary 5½", N-80, tubing Bal-O SSSV @ 2202' RECEIVED Alaska 0il & Gas Cons. Commission Anchorage f/surface - 9207' I nterv .als treated (measured) Attached Treatment ctescription including volumes used and final pressure 14. Prior to Well operation Representative Daily Average Production or I niect~on Data OiI-Bbt Gas-Md Water-Bbl Casing Pressure 981 19709 0 -- Tubing Pressure 2123 0 0 0 -- Subsequent' to operation 15, Attachments 16. Status of well classification as: Copies of D3gs anti Surveys'run--', Dmly Report of Well Ope[ations ~ Oil __ Gas __ Suspencled __ 1Z I hereby certify that the forego, ing is true anti correct to the best of my knowledge. Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE W~T.LRR/4I J. M. Heusser. 263-4266 RECEIVED Alaska Oil & Gas Cons. Commission Anchorage STATE Of ALASKA .~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~ GAS [~] SUSPENDED ~.~ ABANDONED ~ SERVICE [] 2. Name of Operator 7. Permit Number 77-34 ARCO Alaska, Inc. 3. Address 8. APl Number P.0. Box 100360, Anchorage, AK 99510-0360 50- 029-20254 4. Location of well at surface 9. Unit or Lease Name 2546' FSL, 210' FWL, Sec.32, T11N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1626' FSL, 1629' FEL, Sec.32, T11N, R15E, UM 5-9 .... At Total Depth 11. Field and Pool 1421' FSL~ 1341' FEL, Sec.32, T11N~ R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) ' ~ 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 64'! ADL 28326 12. Date Spudded 13. DateT.D. Reached 14. Date Comp., Susp. orAband. ]15. Water Depth, ifoffshore 116. No. of C°mpleti°ns 07/05/77 07/20/77 O7/?F;/77- N/A feet MSL 1 17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional S~rve~ 20. Depth where SSSV set 21. Thickness of Permafrost 10230'MD/9045'TVD 10176'MD/8999'TVD YES [~ NO [] 2251 ' feet MD lqflfl' (~p?ro×.) 22. Type Electric or Other Logs Run D IL/SP/BHCS/GR/Cal, FDC/CNL/GR/Cal, GR/CNL/CCL, Gyro 23. CASING, LINER AND CEMENTING RECORD .. SETTING DEPTH MD CASINGSlZEiWT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94.0# U-40 Surf 110' 32" 281 sx PF cmt 13-3/8" 72.0# MN-80 Surf 2710' 17-1/2" 5000 sx AS cmt 9-5/8" 47.0# N-80/S-95 Surf 10217' 12-1/4" 1100 sx Class G & 300 sx AS I 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 10082' 9890' & 10070' 10030'-10045'MD/8875'-8888'TVD w 1/2 spf 10074'-10125'MD/8913'-8956'TVD w/4 spf 90°. phasing 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Perfs f/10008'-1008)' 160 sx Class G See Rept of Sundry/ ~ell 0ps dated 6/10/88, for stimu]at;ion dati]. 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 1/20/78I F1 owing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO 1/25/78 2 TEST PERIOD ~ 333.8 954.9 23 389/64I 716 Flow Tubing Casing Pressure CALCULATED,~. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 836 .... 24-HOUR RATE "IF 6005 11459 275 27.0 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIV£D NOTE: Perforated .ell 11/19/77. Stimulated 5/27/88. Workover, sqz, & re-perf's FEB 1 ? 1989 performed 2/7/89. Alaska Oli& GaS Coi'l~. "".' l$~"rn~-s/o,~ Submit in duplicate Form 10-407 1 09/WC5 CONTINUED ON REVERSE SIDE Rev. 7-1-80 29. NAME Top Sadlerochit Base Sadlerochit · · GEOLOGIC MARKERS MEAS. DEPTH TRUE VERT. DEPTH 8482' 8968' 30. FORMATION TESTS 9565 ' 10140' Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed_~'~ ~ 'J~t~ ~,.F:t d~O$?~l'~(;~i~ Title Regional Drilling EngrDate INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item :27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none" Form 10407 STATE OF ALASKA AL/-,_.,A OIL AND GAS CONSERVATION COMMIS,,,ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate __ Plugging __ Perforate __ Pull tubing __ Alter casing ~ Repair well __ Pull tubing __ Other Workover 2. Name of Operator ARCO Ala.~ka- Inc. 3. Address P.O. Box 100360 Anchorac~e; AK 99510-0360 4. Location of well at surface 2546' FSL, 210' FWL, Sec.32, T11N, R15E, UM At top of productive interval 1626' FSL, 1629' FEL, Sec.32, T11N, R15E, UM At effective depth 1437' FSL, 1365' FEL, Sec.32, T11N, R15E, UM At total depth 1421' FSL~ 1341' FEL~ Sec.32~ T11N~ R15E; UM 12. Present well condition summary Total depth: measured 10230 'MD feet true vertical 9045 ' TVD feet Effective depth: measured 10176 'MD feet true vertical 8999 ' TVD feet Casing Length Size 80' 20" Conductor 2710' 13-3/8" Surface 1 O196 ' 9-5/8" Production 5. Type of Well: Development Exploratory Stratigraphic Service Plugs (measured) Junk (measured) Cemented 6. Datum elevation (DF or KB) Z UnitorPropertyname Prudhoe Bay Unit 8. Well number 5-9 None 9. Permit number/approval number 77-34/8-606 None Measured depth 10. APl number 50-- 029-20254 11. Field/Pool Prudhoe Bay Oil Pool 281 sx Permafrost 5000 sx Arctic Set 1100 sx Class G & 300 sx AS I 1lO'MD 2710'MD 10217'MD True vertical depth 110 ' TVD 2710 ' I'VD 9034 ' TVD Perforation depth: measured true vertical 10030 ' -10045 ' 10074 ' -10125 8875'-8888', 8913'-8956' Tubing (size, grade, and measured depth) 4-1/2" L-80 w/tbg tail @ 10082' PackersandSSSV(typeand measured depth) Baker 'HB' pkr @ 9890' 'DB' pkr ~ 10070', & CAM60 'BAL-O' S$SV @ 2231' iFrr. B 7 !989 13. Stimulation or cement squeeze summary Intervals treated (measured) Perfs f/10008'-10080' Treatment description including volumes used and final pressure 160 sx Class G 14. N/A Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 116. Status of well classification as: Copies of Logs and Surveys run ~ I Daily Report of Well Operations ,.-- , Oil ,-- Gas ~ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. feet Signed ~>'~%.~ -¢2/ "/'./2.¢O~T/~H,,-i/~/2 Title Regional Drilling En~r. Form 10-404 Rev 06/15/88 Servil~ioduced Water Disposal Date * Workover Well History (Dani) SW04/014 SUBMIT IN DUPLICATE ARCO Oil and Gas Company v Well History - Initial Report- Daily Instructions: Prepare and submit the "Initial Report" on the frst Wednesday after a well is spudded or workover operations are s~arted. Daily work prior to spudding should be summarized on the form giving inclusive dates only. ,~o,-,'~ aT.a~wa T~_ J NORTH SLOPE Field .......... ILesse or Unit IWell no. -D-D'r3t%~O~ ]%~Y / Il,tis ADL: 28326 DS 5-9 Auth. or W.O. no. - A-e 2 ~. 93 / WORKOVER Operator A~I: 50-029-20254 S0u(~ded or W.~'b'~un Date and depth IARCO WI /Prior status ii a W.O, Complete record for each day reported as of 8;00 a,m, AUDI 4 01/20/89 ( TD=10230 PB:10176 SUPV:DS/BB MONITOR WELL MW: 8.5 SEAWATER ACCEPT RIG @ 0800 }iRS 1/19/89. PULL BPV, BLEED OFF DRY GAS, BULLHEAD 300 BBLS SEAWATER DOWN TUBING, BLEED OFF PRESSURE, PRESSURE INCREASED IN 15 MIN. MIX & PUMP HEC PILL DOWN TUBING, BLEED OFF GAS & MONITOR NELL. DAILY:S95,370 CUM:$95,370 ETD:SO EFC:$1,124,370 01/21/89 ( TD:10230 PB:10176 SUPV:DS/BB 2) RU TO PULL CT. MW: 8.5 SEAWATER OBSERVE NELL, BLEEDING GAS & FILL W/ SEAWATER, NU CTU BOPE & TEST TO 2000 PSI, MU 1-1/2" OVERSHOT, ENGAGE FISH @ 55',RU E-LINE, RIH W/ 1-1/16"DUMMY TO 9335', POOH, MU 1-1/I6" McCULLOUGH CHEMICAL CUTTER & RIH TO 9338', CUT 1-1/2" COILED TUBING @ 9338'. DAILY:S42,386 CUM:$137,756 ETD:S137,756 EFC:$1,029,000 01/22/89 ( TD:10230 PB:10176 SUPV:DS/BB NU BOPE MW: 8.5 SEAWATER RU FRACMASTER, PULL 9300' OF 1-1/2" COILED TUBING & SPOOL ONTO DRUM, RD CTU, RU SLICKLINE UNIT, SET PUMP OUT SUB IN NIPPLE @ 9266', TEST PLUG TO 1000 PSI, RD SLICKLINE, RU E-LINE & PUNCH HOLES IN TUBING @ 9118-9119', POOH RD E-LINE DISPLACE 10.6 PPG CaCl2 IN ANNULUS W/ SEAWATER, SET BPV, ND TREE, NU BOPE. DAILY:S62,953 CUM:$200,709 ETD:S200,709 EFC:$1,029,000 01/23/89 ( TD=10230 PB:10176 SUPV:DS/BB CIRC SEAWATER MW: 8.5 SEAWATER NU BOPE, TEST TO 5000 PSI, PULL BPV, BOLDS, BROKE OFF ONE SCREW, SPEAR 5-1/2" TUBING, PU TO 240K% NO MOVEMENT, DRILL 3/4" HOLE THRU LOCKDOWN, PU 275K~ NO MOVEMENT, RELEASE SPEAR, CBU. DAILY:$38,457 CUM:$239,166 ETD:S239,166 EFC:$1,029,000 01/24/89 ( TD:10230 PB:10176 SUPV:DS/BBi MU FTA 94 MW: 8.5 SEAWATER CIRCULATE SEAWATER, SPEAR 5-1/2" TUBING, PU TO 275K9 TO SHEAR PBR, POOH LD 5-1/2" TUBING, TEST RAMS ON 3-1/2" DP, LD TEST PLUG, MU FTA 94. DAILY:S25,658 CUM:$264,824 ETD:S264,824 EFC:$1,029,000 01/25/89 ( TD:10230 PB:10176 SUPV:DS/BB POOH W/PBR BBL MW: 8.5 SEAWATER MU FTA & RIH TO 8906', MU RTTS & STORM VALVE, SET SAME @ 62', ND BOPE & TBG HEAD, REPLACE TBG HEAD & 9-5/8"PACKOFF, TEST 9-5/8"PACKOFF, ATTEMPT TO TEST 13-3/8" PACKOFF- WOULD NOT HOLD, NU BOPE & TEST, RETRIEVE RTTS, RIH W/ OVERSHOT, ENGAGE SBR, ROTATE, POOH W/ FISH. DAILY:$29,728 CUM:$294,552 ETD:S294,552 EFC:$1,029,000 The above is correct Signature F ar~n~s~' see Procedures Manual, Section Drilling, Pages 86 and 87. AR3B--459-1-D FEB 1 7 I Number all daily well history forms consecutively as they are pref3ared for each well. iPage no. ARCO Oil and Gas Company Daily Well History--Interim · Illstructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show Iormation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheels until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Subm t weeMy for workovers and following setting of o[I strinG un i comple ion ICounty or Parish I Stat~K District ARCO ALASKA INC. I NORTH SLOPE 1 I Field ILease or ~)nitS 5 9 PRUDHOE BAY . . - iComplet ...... d t.o&.~,.a~h nay while drilling ..... k .... in prog .... AUU .1. Date and depth as of 8:00 a.m. 01/26/89 ( TD:10230 PB:10176 SUPV:TJ/GG 01/27/89 ( TD:10230 PB:10176 SUPV:TJ/GG 01/28/89 ( TD:10230 PB:10176 SUPV:TJ/GG 01/29/89 ( TD:10230 PB:10176 SUPV:TJ/GG 01/30/89 ( TD:10230 PB:10176 SUPV:TJ/GG 01/31/89 ( TD:10230 PB:10176 SUPV:TJ/GG 02/01/89 ( TD:10230 PB:10176 SUPV:TJ/GG Well no. RIH W/NEW MILL SHOE MW: 8.5 SEAWATER TOH W/ OVERSHOT & PBR BBL, RIH W/ PRT, TEST 9-5/8"CASING TO 1500 PSI, PRESSURE UP TO 2300 PSI TO SHEAR S.O.S.,TAG PACKER @ 9191, MILL ON PACKER, MILL QUIT, POOH, CHANGE OUT MILL SHOE, RIH. DAILY:S37,685 CUM:$332,237 ETD:S332,237 EFC:$1,029,000 CBU MW: 8.5 SEAWATER TIH W/ FTA~6, MILL ON PACKER, RELEASE PRT, POOH, CHANGE OUT MILL SHOE FOR NEW MILL, TIH W/ FTA97, MILL THROUGH PACKER, CBU. DAILY:S25,623 CUM:$357,860 ETD:S357,860 EFC:$1,029,000 RIH W/ FTA #9 MW: 8.5 SEAWATER CBU, TOH W/ PACKER & TAILPIPE ASSEMBLY, TIH W/ KELO SOCKET, TAG FISH @ 9343' ATTEMPT TO CATCH FISH, NO INDICATION OF CATCHING FISH, POOH, NO RECOVERY, LD KELO SOCKET, RIH W/ 8-1/2" HOLLOW MILL. DAILY:S28,025 CUM:$385,885 ETD:S385,885 EFC:$1,029,000 W.O. APRS MW: 8.5 SEAWATER RIH W/ 8-1/2" MILL, MILL OVER COILED TUBING F/9343-9634, POOH 1 JT, STUCK DP, WORK SAME, WAIT ON ALASKA PIPE RECOVERY SERVICES. DAILY:S28,495 CUM:$414,380 ETD:S414,380 EFC:$1,029,000 CIRC SWEEP MW: 8.5 SEAWATER TORQUE & JAR ON PIPE, RU WIRELINE, RIH, TORQUE TO LEFT, SHOOT STRING SHOT @ 9370', BACKOFF DP, POOH & RD WIRELINE, POOH W/ DP & 1 DC, MU SCREW IN SUB, DRILL COLLARS & ACCELERATOR JARS, SCREW INTO FISH, JAR LOOSE SAME, CIRCULATE HEC SWEEP. DAILY:S36,260 CUM:$450,640 ETD:S450,640 EFC:$1,029,000 MILL CMT & COIL TBG MW: 8.5 SEAWATER CIRCULATE OUT HEC PILL, POOH, RECOVER 50' COILED TBG, MU NEW FTA, RIH, TAG TOP OF COILED TBG & CMT @ 9634', MILL ON CMT & COILED TBG TO 9800' DAILY:S28,653 CUM:$479,293 ETD:S479,293 EFC:$1,029,000 CUT CT OFF BHA MW: 8.5 SEAWATER MILL CMT & COILED TBG TO 10028', CBU, SHORT TRIP 6 SINGLES (TIGHT) TIH TO 10065', REVERSE CIRCULATE, POOH, REMOVE COILED TBG FROM BHA. DAILY:S26,240 CUM:$505,533 ETD:S505,533 EFC:$1,029,000 The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B FEB 1 7 ?~laska Oil & (~s Coru. C0rJijllj$s],gj] Number all dally well hislory terms as they are prepared for each well. consecutively IPage no, ARCO Oil and Gas Company Daily Well History--Interim · instructions: This form is used during drilling or workover operations If testing, coring, or perforating, show Iormation name in describing 'work performed. Number all drill stem tests sequentially. Attach description of ail cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative Iest on "Final" form. 1) Submit "Interim" sheets when filled out bul not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and lollowing seiting of nfl string until completion. District ICounty orDParish 1 Stal%K ARCO ALASKA INC. NORTH SLOPE Field Lease or Units PRUDHOE BAY . .5-9 Complete record for each day while drilling or workover in progress AUDI 4 Date and depti3 as of 8:00 a.m. 02/02/89 ( TD:10230 PB:10176 SUPV:TJ/GG 02/03/89 ( TD:10230 PB:10176 SUPV:DS/BB 02/04/89 ( TD:10230 PB:10176 SUFV:DS/BB 02/05/89 ( TD:10230 PB:10176 SUPV:DS/BB 02/06/89 ( TD:10230 PB:10176 SUPV:DS/BB 4) 5) 6) ) 8) RIH W/ 8-1/2"MILL MW: 8.5 SEAWATER POOH RECOVER 163'CT & NOZZLE, RIH W/ RTTS & CLOSING FINGERS TO 2600', SET & TEST F.O.'s TO 1500 PSI, POOH, RIH W/ 15 JTS OF 2-7/8" TUBING ON DP TO 10056', SPOT BALANCED PLUG W/ 32.7 BBLS CLASS 'G' CMT, POOH TO 9300', SQUEEZE 8 BBLS INTO FORMATION, HELD 1450 PSI FOR 1 HR, POOH, RIH W/ 8-1/2" MILL. DAILY:S126,451 CUM:$631,984 ETD:S631,984 EFC:$1,029,000 MILLING CEMENT MW: 8.5 SEAWATER WOC 1 HOUR, RIH W/ 8-1/2" MILL, TAG CMT @ 9650', MILL HARD CMT F/ 9650-9895', PRESSURE TEST 9-5/8" CASING TO 2500 PSI FOR 30 MIN, MILL HARD CEMENT TO 10035. DAILY:S25,391 CUM:$657,375 ETD:S657,375 EFC:$1,029,000 RIH W/ SCRAPER MW: 8.5 SEAWATER MILL CMT F/10035-10050',TEST SQUEEZE TO 1000 PSI, MILLED HARD CMT F/10050- 10080',THEN STRINGERS AND JUNK TO 10176',CIRCULATE HI-VIS SWEEP,TEST CASING & PERFS TO 1000 PSI, POOH, STUCK, PUMP 6 JTS OUT OF HOLE, JARRING TO LOOSEN JUNK, PUMP HI-VIS SWEEP,CBU,POOH W/NO DRAG,MU BHA & RIH, SLIP 40' DRILL LINE. DAILY:S26,100 CUM:$683,475 ETD:S683,475 EFC:$1,029,000 MU NEW PERF GUN MW: 8.5 SEAWATER RIH TO 10166' TAG FILL & WASH TO PBTD OF 10176',CBU, REVERSE CIRCULATE 100 BBL HEC PILL AROUND,DISPLACE W/SEAWATER TREATED W/C-193 CORROSION INHIBITOR, POOH, LDDP,PULL WEAR BUSHING,RU E-LINE, RIH PERF F/10105-10125' 4SPF 90 DEGREE PHASING,POOH, MU NEXT PERF GUN. DAILY:S26,429 CUM:$709,904 ETD:S709,904 EFC:$1,029,000 RUNNING 4-1/2" TBG MW: 8.5 SEAWATER RIH AND PERF F/10084-10105 4 SPF, POOH, MU NEW PERF GUN, RIH PERF 10074-10084' 4 SPF AND 10030-10045' 1/2 SPF,POOH, RIH W/ 8.3" GR/JB TO 10070', POOH, MU BAKER DB PACKER AND TAILPIPE, RIH SET PACKER @ 10050', POOH, RD WIRELINE, TEST VARIABLE RAMS ON 4-1/2", RIH W/ HB PACKER ON 4-1/2" COMPLETION STRING. (CAMCO 'BAL-O' SSSV @ 2231', BAKER 'HB' PKR @ 9890' & 'DB' PKR @ 10070', & TT @ 10082'.) DAILY:S62,928 CUM:$772,832 ETD:S772,832 EFC:$1,029,000 IWell no. Sig.n at u~.e '% ' ,~ For for~ pregaration and dis?rib-ution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B Number all dail~ IPage no ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Pluqged, Abandoned, or Sold. "Final Report" should be Submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an olficial test is not required upon completion, report completion and representative test data in blocks provided The "Final Report" form may be used for reporting [he entire operation if space is available. I Accounting cost center code ' ~Slate D,,lriot ,~CO ,U.,AS~ INC. Field PRUDHOE BAY Lease or U~)L 28326 DS 5-9 Auth. or W.O. n~S2483 ]Title WORKO~R ~I: 50-029-20254 Operator ~CO Spudded or W.(~f~T Date and depth as of 8:00 a.m. 02/07/89 ( TD:10230 PB:10176 SUPV:DS/BB A.R.Co. W~ll. 0000 Date 01/19/89 Complet .... o~d~[ea~h day reported Iotal number of wells (active or inactive) on this est center prior to plugging and bandonment of this well I I Prior status if a W.O. our 0800 HRS RIG RELEASED MW: 8.5 SEAWATER RIH W/ 4-1/2" PRODUCTION TBG, STING INTO DB PACKER, VERIFY, SPACE OUT & LAND, PRESSURE TBG TO 2700 PSI TO SET UPPER PACKER, SOS BLEW, SHEAR PBR,RELAND TBG, SET STANDING VALVE IN NIPPLE @ 10078',TEST TBG TO 3000 PSI & ANNULUS TO 2500 PSI,RETRIEVE STANDING VALVE, SET BPV, ND BOPE,NU TREE & TEST TO 5000 PSI, FREEZE PROTECT TOP 3134' WITH DIESEL, RELEASE RIG @ 0600 HRS 2/7/89. DAILY:S288,844 CUM:$1,061,676 ETD:S1,061,676 EFC:$1,029,000 Old TD New TD I PB Depth Released rig Date IKind of rig Classifications (oil, gas, etc.) I Type completion (single, dual, etc.) I Producing method J Official reservoir name(s) I Potential test dale .. Welt no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas par day , Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity AIIowabl~ E'ifective date corrected The above is correct For form preparation and distribution, see Procedures Manual, Section Drilling, Pages 86 a.d 87. AR3B-459-3-C Number all daily well history fO:~'r~s consecutively es they are prepared lor each well. jPage no. Dlvllion of AtlantlcRIchfleldCompany ARC(] ALA~KA., £NC~ F'~O, BOX i ~)(~360 ANCHORAGE, ALA~K~ 995'~g, DATE' 2-i 5-89 REFERENCE' ARCO CAZED HOLE FINALZ i -i 4 2-4-89 S-5 2-S-89 ~-24 2-6-89 .S-.~"'a, ,=o-8-89 5-.9 2-4-8'".:" 6- t 4 2-8-89 tJOLLAR/FE. RF RUN i , 5' PRODUCTION (GRAD!OMANOMETEF..:) RUN i, 5' COLLAR/PERF RUN t , ...,q" FLUID DEN~'I'rY (GRAD!OMANOMETER) RUN i, 5' COLLAR/F'ERF RUN t, 5' COLLAR/F'ERF RUN i, 5· F'LFAS'E ,~IGN AND RETURN THE ATTACHED COF'Y Al;; RECEtF'T OF DATA, A'FLA~~ A'f".... A ~' .?CH ATLA;~;' A'T'LA.? RECEIVED BY HAVE A NICE DAY! ~'ALL. Y ' i40FFt£CK El";..' ATO- ~..,, ~. ,. ]-RAN$ AF:'PROYED _1~. .... A,ss,,,,' '"~ ~i~" ,.," .":i36.:.%. Com~is~,ioli DISTRIBUTION $ CENTRAL FI'~ '' ''' ':" C~.-iEVRON D & M ~ EXTENSION EXPLORATION ~~ EXXON MARATHON ~ MOBii ~ 'PHILLIPS PB WELL FILES' R & D ~~ SAF'C $ ~'T'ATE OF ALA*JKA · ~' TEXACO 995i ':'} DATE' i-Si-89 REFERENCE - i -i 3 t i-t6 i S-iC, 4-i2 i 4-i~ i ~-6 i 5-9 i 7-30 i ii-i i i5-i4 i t6-2i i F'WDW2-i i F'WDW2-i i !- Wi)W.5- i i F'LEAZE SI ARCO CA~ED HOLE FINALS -6-89 -4-89 - i i .-89 .._'~-o3-88 -i ~'" -- 8 9 .,..' . -t 5--89 -i 9-89 -i 9-8':? -'-'i -,q9 -% _ . -6--89 -i ~-89 -9-89 -i 0-89 --i S-89 · -i 9-89 2-24-88 PRODUCTION F'F~'.OF I L.E COI_LAR/F'ERF PF-'.OI)UCT I ON PROFILE COLLAR/PI--RF F'RODUCTION F'R(]FI LE DT_F'FERENTIAL TEMF' 'FEMF' COLLAR/F'ERF C 0 L L A R / P E R F' LEAK DFZTI::CT:[ON DIFFERFNTIAI_ ]"EMF' PRODUCTION F'ROFZLE F'F,'ODUCTION PROFILE Fi_OWMETER LEAK DETECTION TEMP COLLAR/F'IERF--SET PLUG GN AND RETURN THE ATTACHED COPY A~ R E C EL I F:' T 0 F RUN i , 5 RUN I , 5 R LJN '~ , ..,,' RUNS i-3 R U N i ,.,. I:;,' I.J i:~ i, R L.INi , RUN i, ~ F'.'.UN i: 5 F;: U N i , RUN ~, ."2 F,'IJNi, _.,"" RUN 2, 5 RtJN 'i , 2. RUN ~, 5 RUN i, 5 D A 'l' A, ,ii · 14 · · I! C A ~,! C: 0 HLS C A ¢i C: 0 t; E A R C A ri C ('J C A r,i C 0 C A HC 0 A T L A Z A i' L. A Z C A ¢'~ C 0 C A ¢.i C 0 C A i'fi C 0 C A H C C) CAMCO RECEIVED BY__ HAVE A NICE DAY! SALLY HOFFECKER ATO-i529 TRANZ ~89~ AF'PROVED __~___ Anchorage DISTRIBUTION CENTRAL FILE~ Ur'tEVRON D & M 'EXTENSION EXF'LORATION EXXON MARATHON MOBIL FtHILLIF'S PB WELL_ FIL. E.S' R & D SAPC STATE OF' AI_A$1<A TEXACO * HLS (HALLIBLIRTON LOGGING SERVICES) I£ THE NEW NAME FOR GEARHAF(:T. 'THE AP1 ~ ON THIS LOll-' IS INCORREC'/; IT SHOULD BE 50-029-20254, ............. & - .?;._ _ ....... Drilling Caneraccor ~__.U_ Oene~! Hougak~'"p/n!~~/ Rig ...... ~ ........ ..q ......... -~-- . I I ..... -": T.'..",:. · ...... }l~d_ S.v,,,_-~...I VLa_u.__~.. _.Audio. Trip Tank ~/ '- '' I ,e ....... __ .. , ........... '1_ . .... --.- - ..... Flow gas ~ecea~o~. ~...~_~ ..... ' ~ .... . ..... ,. 3lind bm.__ ..........._, , Choke LAfla ,Valvml_ ____ ,i,¢,l, Valve F, ill Line' Valve!: Ghaak Valve , Eelly and .Floor ..-- .1. :.. '~_ it.. ,ff_~ 0 .... Choke hnifold .... . . ...... ~000 ......... au, very. s_.~, ' r ................ ' ....... ..... .. ~ .~dJus ~'.~ bi ~ ~ ~A~.~ ....... / .......................... il _. ---- ..... - .i .... . ...... r. -~'~_ .... ~,. %allures .... .-~ .... __ TeS~ ~e ~lpll% o% impingement of failed equi~mifle Co bi made ~lchin da~e and Znspeccoc/ Oo~iieiou offiaa ao~ified. Dl, lt%l. but:ion. ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 20, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 5-9 Approval No. 8-606 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JMH/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 5-9)W1-3 detailing work per- WELLS3/41 ARCO A~aska, ~.¢. is a $-bsidiary of AHamticRichfie~dCompa.¥ AR3B - 6132-C STATE OF ALASKA - AL~-. ,A OIL AND GAS CONSERVATION COMMI;. ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations pedormed: Operation shutdown __ Stimulate __ Plugging __ Pedorate __ Pull tubing __. Alter casing __ Repair well __ Pull tubing __ Other V/ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development ..~ Exploratory __ Stratigraphic __ Service __ 4. Location of well at surface 2546' FSL, 210' FWL, Sec. 32, TllN, R15E, UM 6. Datum elevation (DF or KB) 64' RKB 7, Unit or Property name Prud~oe Bay Unit 8. Well number 5-9 At top of productive interval 1626' FSL, 1629' FEL, Sec. 32, TllN, At effective depth 1437' FSL, 1365' FEL, Sec. 32, TllN, At total depth 1421' FSL~ 1341' FEL, Sec. 32, TllN, 12. Present well condition summary Total depth: measured 10230 feet true vertical 9045 feet R15E, UM R15E, [TM R15E, UM 9. Permitnumbeflapprovalnumber 8-606 10, APInumber 50-- 029-20254 11, Field/Pool Prudhoe Bay Oil Pool Plugs(measured) feet Effective depth: measured 10176 feet true vertical feet 8999 Casing Length Size J u nk (measured) Cemented Measured depth . True vertical depth Conductor 80' 20" Surface 2686' 13-3/8" Production 10153' 9-5/8" 281 sx Permafrost 110' 5000 sx Arctic Set 2750' 1100 sx Class G 10217' 110' 2750' 9034' Pedorationdepth: measured None None true vertical Tubing (size, grade, and measured depth) 4½", N-80, tubing f/9207-9326' MD, Packers and SSSV (type and measured depth) B~ker SAB packer ~ 9196' MD; Camco 13. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 5~"2 , N-80, tubing f/surface - 9207' Bal-O SSSV @ 2202' 14. Prior to well operation Subsequent to operation ,Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 981 19709 0 -- 0 0 0 Tubing Pressure 2123 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations _.~ Oil ..~ Gas __ Suspended __ 17. I hereby certify that the foregoing is true and correct to the(l~St of my knowledge. Signed ~¢7¢ ~,~~~" Title Form 10-404 Rev 06/15/88 Service H~n2Eer Date SUBMIT IN DUPLICATE Objective: Drill Site 5-9 COILED TUBING CEMENT SQUEEZE GAS SHUT OFF To shut off excess gas production. 7/2/88 7/3-4/88 Performed coiled tubing acid wash across the following intervals: 9963 - 9991'MD (previously squeezed 1-4-84) 10008 - 10118' MD with the following treatment' 1) 2) 3) 59 bbls 12% HC1 dispersed with xylene 59 bbls 12-3% HC1- HF 60 bbls 12% HC1 RU coiled tubing. Attempt to squeeze the existing intervals as noted below.with 40 bbls of cement 10008 - 10020' MD 10030 - 10045' MD 10056 - 10118' MD Reference: BHCS 7-18-77 qt Could not pull coiled tubing from well. Contaminated cement downhole. Flowed well to surface in an attempt to free coiled tubing. Coiled tubing parted at surface. Well shut in awaiting rig workover to recover coiled tubing fish. IMH 10/6/88 \ \'\. ..... '-. STATE OF ALASKA ApPL^ Zs o,.co.s..w ,o. COM ,SS,O. ICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend %Operation Shutdown [] Re-enter suspended well ~ Al~(casing [] Time extension [] Change approved program [] PIb~gjng [] Stimulate [] Pull tubing ~ Amend order ~ Per~o~ate X OtherX 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. RKB 64' feet 3. Address 6. Unit or Property name P. O. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit 7. Well number 5-9 4. Location of well at surface 2546' FSL, 210' FWL, 5ec.32, T11N, R15E, UM At top of productive interval 1626' FSL, 1629' FEL, Sec.32, TllN, R15E, UM At effective depth 1437' FSL, 1365' FEL, Sec.32, T11N, R15E, UM At total depth 1421' FSL, 1341' FEL, Sec.32, T11N, R15E, UM 8. Permit number 77-34 9. APl number 50-- 029-2025b, 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2710' P roducti on I 01 96' I 0230 'MD feet 9045 ' TVD feet 10176'MD 8999'TVD Size 20" 13- 3/8" 9 -5/8" Plugs (measured) None feet Junk (measured) None feet Cemented Measured depth 281 sx Permafrost 110'MD 5000 sx Arctic Set 2710'MD 1100 sx Class G 10217'MD True Vertical depth 110'TVD 271 0 ' TVD 9034 ' TVD Perforation depth: measured 10008'-10020', 10030'-10045', 10056'-10118' true vertical 8859'-8867,, 8875'-8888', 8898'-8950' Tubing (size, grade and measured depth) ,:~ia;:';j~ OJJ & (~.a~ (;:~:;-:;. '~.;c,:.. ;; :.;i:;i;,: 4-1/2", N-80, tubing f/9207'-9326' 5-1/2" N-80 tubing f/surf4ce¢ * 92,07' Packers and SSSV (type and measured depth) Baker "SAB" packer e 9196'; Camco "Bal-O" SSSV 8 2202' 12.Attachments Description summary of proposal [] Detailed operations program ~.~ BOP sketch ,,~ 13, Estimated date for commencing operation September 10, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~t~_ ~L,~~ Title Associate Engineer Commission Use Only ( J6 ) SA3/0028 Conditions of approval Notify commission so representative may witness J Approval [] Plug integrity [] BOP Test [] Location clearanceJ ORIGINAL SIGNED BY Approved Copy c.,,, NO. Approved by Commissioner Form 10-403 Rev 12-1-85 %®'~i~')'''' Date the commission Date <~2 ~, Submit in triplicate DS 5-9 (PRODUCER) WORKOVER PROCEDURE SUMMARY Objective The objectives of the workover are to remove +10,000' of 1-1/2" coiled tubing from inside the 5-1/2" tubing, retrieve the 5-1/2" production tubing, mill and retrieve the permanent production packer, squeeze the production interval, reperforate selected intervals, and install a 4-1/2" x 3-1/2" straddle packer completion assembly and a corrosion inhibition treater string. 1. MIRU WWI. ND tree, NU BOPE and test. Load tubing with seawater to kill well. 2. MU 1-1/2" inside/outside dressing mill assembly on 2-7/8" workstring anc~ RIH. Dress off top of 1-1/2" coiled tubing @ +30' MD. POOH. 3. MU 1-1/2" overshot on 2-7/8" workstring and RIH. Engage fish and pick up to put coiled tubing in tension. . RU electric line. MU 1" dummy chemical cutter and sinker bars and RIH. Run down inside 1-1/2" coiled tubing as deep as possible (coiled tubing stuck @ +10,030' MD). POOH. 5. MU 1" chemical cutter and sinker bars and RIH. Cut 1-1/2" coiled tubing at depth reached in dummy run. POOH. RD electric line. 6. POOH with coiled tubing. . RU slickline unit. Run inside 5-1/2" tubing w/gauge ring/junk basket to _+9325' Md. POOH. 0 MU 4-1/2" DB lock and aluminum pump out plug on slickline and RIH. Set pump out plug in 'DB' nipple in packer tailpipe. Plug is set to shear at 2000 psi. POOH. 9. RIH and set tubing collar stop @ +9080' MD. RIH w/Kinley slickline tubing perforater and punch 1, 3/4" hole in 5-1/2" tubing @ +9080' MD. POOH. RD slickline. 10. Circulate 10.6 ppg CaC12 out of annul us wi th seawater. 11. PU landing joint and engage tubing hanger. Pull tubing hanger and 5-1/2" production tubing. LD tubing and hanger. 12. MU PBR retrieving tool and RIH on 3-1/2" DP. Engage PBR and rotate K-anchor ou~ of packer. POOH, LD PBR and K-anchor. 13. MU packer, ,milling/retrieving tool on 3-~2J'l~QP~and~H.~i~,~,~ ~- .~ i~"~'i Mill over Baker SAB packer and retrieve same. , ~. ~ ~ ~. DCS/010.2 14. MU Fishing assembly for remaining 1-1/2" coiled tubing and 3-1/2" OD nozzle. Retrieve coiled tubing and nozzle. 15. RIH w/8-1/2" cement mill and clean out 9-5/8" casing to _+10,050' MD. Circulate bottom up. POOH. 16. MU 2-7/8" cement stinger on 3-1/2" DP and RIH to 10,050' MD. Mix and spot 200 sx Class 'G' cement and additives. POOH to +100' above TOC. Close annular preventer, squeeze +20 bbls cement into perforation at 9963' - 10045' MD. 17. POOH. LD 2-7/8 tailpipe. MU 8-1/2" cement mill on 3-1/2" DP and RIH. 18. Clean out 9-5/8" casing to _+9900' MD. Test 9-5/8" casing to 2500 psi. 19. Clean out 9-5/8" casing to 10,050' MD. Test squeezed perfs 9963'-10,045' MD to 1000 psi. 20. Clean out 9-5/8" casing to 10,176' MD (PBTD). Test squeezed perfs 9963'-10,118' MD to 1000 psi. POOH. 21. MU 8-1/2" bit and 9-5/8" casing scraper and RIH to PBTD. Circulate and displace hole with inhibited seawater. POOH, LD DP. 22. RU electric line. RIH w/5" OD casing guns and perforate 10,035'-045' MD and 10,056' -125' MD. POOH. 23. MU 9-5/8" permanent isolation packer with pumpout plug in tailpipe on electric line and RIH. Set packer at +10,046' MD with tailpipe at +10,055' MD. POOH, RD electric line. 24. MU 3-1/2" tubing and seal assembly below a 9-5/8" x 3-1/2" retrievable packer and RIH with 4-1/2" x 3-1/2" production tubing equipped with a 3/8" corrosion inhibition treater string. 25. Land seal assembly in isolation packer. Space out and land tubing hanger. Pressure tubing to set upper packer. Pressure test tubing to 3000 psi and annulus to 2500 psi. 26. PU tubing to shear PBR seals. Re-land tubing and install BPV. 27. ND BOP's, NU tree and test to 5000 psi. Retest tubing and annulus to 3000 psi and 2500 psi, respectively. 28. Pressure tubing to shear pump-art plug in lower packer tailpipe. 29. Release rig, turn well over to Production. Application for Sundry Approval Workover Fluid: 8.5 ppg seawater BHP: 8.18 ppg (374.5 psJ @ 8800' TVff) ANNULAR PREVENTER § ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. TUDIN6 HEAD ;5 1. 13-3/8" CASING HEAD 2, 9-5/8" CASING HEAD 3. 5000 PSI TUBING HEAD 4, 13-5/8" - 5000 PSI BLIND RAMS 5. 13-5/8" - 5000 PSI PIPE RAMS 6. 15-5/8" - 5000 PSI ANNULAR BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES, 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI, 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES, 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES, BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES, TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI, 9, OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE, CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI, 10. OPEN BLIND RAMS AND RECOVER TEST PLUG, MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVE5 ARE SET IN THE DRILLING POSITION, 11. TEST STANDPIPE VALVES TO 5000 PSI, 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP, 1:3. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. JG NOVEMBER 21,1986 ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 10, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 5-9 Approval No. 8-300 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi (DS 5-9)W1-3 RECEIVED JUN 1 4 1988 Alaska 0ii 8, (las Cons. Commission Anchorage WELLS2/95 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM~oSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown - Stimulate.~ Plugging '' Perforate Alter Casing F: Other * Pull tubing 2. Name of Operator ARCO Alaska, Inc. 3. Address ;P. O. ;Box 100360, Anchorage, AK 99510 4. Location of well at surface 2546' N & 210' E of SW cr, Sec. 32, TllN, R15E, UM At top of productive interval 1626' N & 1629' W of SE ct, Sec. 32, TllN, R15E, UM At effective depth At total depth 1421' N & 1341' W of SE ct, Sec. 32, TllN, R15E, UM 5. Datum elevation (DF or KB) 64 ' RKB Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 5-9 8. Approval number 8-300 9. APl number 50-- 029-20254 10. Pool Prudhoe Bay Oil Pool 11. Present welt condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2686 ' Production 10166' 10230 feet 9045 feet 10176 feet 8999 feet Size 20" 13-3/8" 9-5/8" Plugs (measured) Junk (measured) Cemented Measured depth 281 sx Permafrost 5000 sx Arctic Set 1100 sx C1 G True Vertical depth 110' 110' 2750' 2750' 10230' 9045' Perforation depth: measured 10008-10020' 10030-10045' , true vertical , 10056-10099' 8857-8867'; 8876-8889'; 8898-8934' Tubing (size, grade and measured depth) 5~" 17(~ N-80 9207' MD; 4~" . , 2 , , , a , 12 6fi N-80 @ 9326' MD Packers and SSSV (type and measured depth) JUN 1 4 1988 SSSV - Camco Bal-0 Nipple, 2202' MD; SAB Baker packer, 9196' MDN~-~ka~'"&g'a~,-ons. Commission 12. Stimulation or Cement squeeze summary Anchorage Intervals treated (measured) Attached Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 981 19709 0 -- 2123 607 19627 0 -- 2465 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 WELLS2/95 T. P. Allen, 163-4837 Date Submit in Duplicate DS 5-9 Description of Work Performed TREATMENT: OBJECTIVE: TREATMENT DATE: Selective Mud Acid Stimulation To Stimulate Zone 2 &lB May 27, 1988 1. Obtained a sample from DS 5-9 and performed emulsification, sludging and titration testing of the acid system prior to pumping. 2. Obtained capacity of well prior to this treatment. 3. Loaded 6% HCL-1.5% HF mud acid and 12% HCL with additives. Loaded diesel with EGMBE. 4 RIH with Coiled Tubing Unit and set nozzle at 9950. 5. Loaded 275 bbl$. of crude down the coiled tubing/tubing annulus at 2 BPM. 6. Pumped the following stimulation fluids down the coiled tubing: 1720 gals 2% NH4CL water w/CHMEC and 800# of diverter 5000 gals 12% HCL w/additives 7730 gals 6% HCL-1.5% HF w/additives 7600 gals 2% NH4CL water 1 5 0 0 gals diesel w/10% by volume of EGMBE 7. Displaced the fluid in the coiled tubing with 20 bbls. of diesel and 6 bbls of methanol, reciprocated across the perforated intervals. 7. Immediately flowed well back to the system. 8. Placed well in the test separator and obtained capacity of well. RECEIVED Alaska 0JJ & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 7, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 5-9 Permit No. 77-34 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, ~ ~ ~? - / / / D. F. Scheve D~'S/Jm~/] p At tachment Standard Alaska Production Company J. Gruber, AT0-1478 P1 (DS 5-9)W1-3 JUN 9 1988 Alaska 011 & {3as Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASK,, OIL AND GAS CONSERVATION COMtv,,,~SlON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 64' RKB feet 3. Address 6. Unit or Property name P.O. Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location of well at surface 2546' N & 210' E of SW cr, Sec. 32, TllN, R15E, UM At top of productive interval 1626' N & 1629' W of SE cr, Sec. 32, TllN, Ri5E, UM At effective depth At total depth 1421' N & 1341' W of SE er, Sec. 32, TllN, R15E, UM 7. Well number DS 5-9 8. Permit number 77-34 9, APl number 50-- 029-20254 10. POOl Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured 10230 feet true vertical 9045 feet Effective depth: measured 10176 feet true vertical 8999 feet Casing Length Size Conductor 110' 20" H-40 Surface 2750' 13-3/8" MN-80 Production 10230 ' 9-5/8" N-80 Plugs (measured) Junk (measured) Cemented Measured depth 281 sx Permafrost 110' 5000 sx Arctic Set 2750' Wue Verticaldepth llO' 2750' 1100 sx C1 G 10230' 9045' 9 Alaska 0it & Gas Cons. commission Anchorage Perforation depth: measured 10003-10020' , 10030-10045' , 10056-10118' true vertical 8868-8883'; 8892-8904'; 8914-8948' Tubing (size, grade and measured depth) 5½", 17f/, N-80, 9145' MD; 4½", 12.6f/, N-80 @ 9145-9326' MD Packers and SSSV (type and measured depth) SSSV- Camco Bal-0 Nipple, 2202' MD; SAB Baker packer, 9196' MD 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation June 15, 1988 14. If proposal was verbally'approved Subsequent Work Beportexl on Name..Df approver Forizi.No,- - D~te~] / __./___ Date approved 15.1 hereby(ciertify tha,t~th/~e forgoing is true and correct to the best of my knowledge Signed~-/~,/~ ~~~/'V/H ,/ Title Operations Engineering Manager Commission Use Only Conditions of approval Notify commission so representative may witness I Approval [] Plug integrity [] BOP Test [] Location clearanceI · Approved Copy No. Approved by ORIGINAL ,SIGNED BY LONNIE O. S~tIH .. · / Returned¢.__ .,, Commissioner by order of the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate 2f ', 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF WIRELINE BOP EQUIPMENT DRILL SITE 5-9 Gas Shut Off CTU Cement Squeeze Preliminary Procedure , . , . . Rig up CTU. Clean out fill as necessary and perform pre-squeeze perforation wash. Perform Valid well test. With the CTU, cement squeeze the existing perforated interval ( 10,030 - 10,045'; 10,056 - 10,1lB' MD )with 40 barrels of cement. Maintain a bottom hole squeeze pressure of approximately 5200 psi for one hour. Contaminate cement for an ultimate contaminant/cement ratio of 2:1. During contaiminating operations, slowly bleed surface squeeze pressure to maintain a minimum 200 psi differential pressure into the formation. Wait on cement for a minimum of 12 hours. Reverse out contaminated cement. 6. Wait on cement for at least 2 weeks prior to reperforating the well. . . Nitrogen lift the top 2000' of fluid in the tubing in preparation for perforating operations. Shoot the following reperforated interval' (Ref. BHCS 7/18/77) 10,062 - 10,125 'MD Reperf 9. Test well. 2 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSi 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS §. 5000 PSI 4 1/16" STUFFING BOX COILED TUB ING: UN I ? BOP EQU I PMEN~ ! ARCO Alaska, Inc. Prudhoe Bay ,_,~gineering Post Office Box 100360 Anchorage, Alaska 99510~0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 20, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 5-9 Permit No. 77-34 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the~'~bove-.referenced well. This procedure will be performed after the APproved perforation work (Approval No. 8-224). Very truly yours, D. F. Scheve DFS/JMH/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 5-9)W1-3 WELLS2/95 ARCO A~aska, ~.¢. is a Subsidiary of AHa.ticRichfieldCompany AR31-~6137 -- STATE OF ALASKA .... ALASt OIL AND GAS CONSERVATION COML ,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well i_. Alter casing .~ Time extension [] Change approved program [] Plugging ~ Stimulate ~ Pull tubing ~ Amend order ~ Perforate E] Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 2546' N & 210' E of SW cr, At top of productive interval 1626' N & 1629' W of SE cr, At effective depth Sec. 32, TllN, R15E, UM Sec. 32, TllN, R15E, UM Attotaldepth 1421' N & 1341' W of SE cr, Sec. 32, TllN, R15E, UM 5. Datum elevation (DF or KB) 64' 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 5-9 feet 8. Permit number 77-34 9. APl number 50-- 029-20254 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured 10230 feet true vertical 9045 feet Effective depth: measured true vertical Casing Length Conductor 110' Surface 2750' Production 10230 ' 10176 feet 8999 feet Size 20" H-40 13-3/8" MN-80 9-5/8" N-80 Plugs (measured) Junk (measured) Cemented Measured depth 281 sx Permafrost 0-110' 5000 sx Arctic Set 0-2750' 1100 sx C1 G 0-10230' ~ue Verticaldepth 0-110' 0-2750' 0-9045' Perforation depth: measured 1~003-10020', 10030-10045' true vertical , 10056-10099' 8868-8883', 8892-8904', 8914-8950' ~bing(size, grade and measured depth) 5~", 17#, N-80, 0-9145' MD; 4½", 12.6#, N-80 9145-9326' MD Packers and SSSV(type and measured depth) SSSV - Camco Bal-0 Nipple, 2202' MD; SAB Baker packer, 9196' MD 12.Attachments Description summary of proposal ~q Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation 14. If proposal was verbally'approved Sut)Sequent Work tt on Fo m Name of approver Date approved 15. I hereby/~ertify that th~ foregoing is true and correct to the best of my knowledge Signed ~/E-'/~~~~ Title Operations Engineerin8 Manager Commission Use Only Conditions of approval Notify commission so representative may witness Approved by [] Plug integrity ~ BOP Test ~ Location clearance] Approval No. Date ORIGINAL SIGNED BY LONNIE C. SMITH Form 10-403 Rev 12-1-85 Approved Copy Returned Commissioner WELLS2/95 T. P. Allen, 163-4837 by order of .~, ,. the commission Date Submit in triplicate Drill Site 5-9 Mud Acid Stimulation Treatment ARCO Alaska, Inc. proposes to perform the following stimulation treatment: 1. Obtain a wellhead fluid sample from well 5-9 and perform emulsion and sludge tests with all stimulation fluids. 2. Obtain a well test prior to performing the treatment. 3. Load 5000 gals of 12% HCl acid and 7500 gals of 6%-1.5% HCI-HF acid with additives (see attached sheets). Titrate acid and test for iron content. 4. MIRU CT unit, pump truck and transports. 5. RIH with CT to 9950'MD. 6. Load the CT/tubing annulus with 220 bbls of dead crude 7. Roll all acid compartments before pumping starts. 8. Pump the following fluids: A. 1500 gals of 2% NH4CL water with CMHEC blended with -600# of oil soluble resin (coarce) -50 gals of liquid oil soluble resin (fine) B. 5000 gals of 12% HCl w/additives C. 7500 gals of 6% HCl - 1.5% HF w/additives D. 7500 gals of 2% NH4Cl water E. 1500 gals of diesel/10% EGMBE 9. Displace coiled tubing with diesel or crude, reciprocating across all perforations w/CT to dissolve diverter material. 10. Immediately start producing well back to the surface. If the well is unable to flow the stimulation fluids to surface, N2 lifting is required. 1 1. Obtain a well test to determine the well's capacity. 6 5 4 3 2 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS ;3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX COILED TUBING UNIT BOP EQUIPMENT III II ARCO Alaska, Inc. Prudhoe Bay ,.;ngineeHr~g Post Office Box 100360 Anchorage, Alaska 99510~0360 Telephone 907 263 4248 Donald F. Scheve Operations Er~gineering Nlanage~' March 25, 1988 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re: DS 5-9 Permit Number: 77-34 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/WJP'sd Enclosures CC' Standard Alaska Production Co. JoAnn Gruber, ATO 1478 File P1(5-9)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtianticRichfieldCompany Af~31~, 6132 C STATE Of ALASKA ALASKa-, OIL AND GAS CONSERVATION COMMI,.,,SlON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing Time extension ~ Change approved program ~ Plugging [] Stimulate~ ~ Pull tubing ~ Amend order ~ Perforate.;,~Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address Post Office Box 100360, Anchorage, AK 99510 4. Location of well at surface 2546'FSL, 210'FWL, Sec. 32, T11N, R15E, UM At top of productive interval 1626'FSL, 1628'FEL, Sec. 32, T11N, R15E, UN At effective depth 1437'FSL, 1364'FEL, Sec. 32, T11N, R15E, UM At total depth 1421'FSL, 1341'FEL, Sec. 32, T11N, R15E, UlVl 11. Present well condition summary Total depth: measured true vertical 10230 feet 9045 feet Plugs (measured) 5. Datum elevation (DF or KB) 64' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 5-9 8. Permit nur~e_~34 9. APl number 50-- 029-20254 10. Pool Prudhoe Ba,v Oil Pool Effective depth: measured 10176 feet true vertical 8999 feet Junk (measured) Casing Length Size Cemented Measured depth True Vertical depth Conductor 110' 20" 281 sx Permafrost 110' 110' Surface 2750' 13-3/8" 5000 sx Arcticset 2750' 2750' Intermediate 10217' 9-5/8" 1100 sx Class G 10217' 9034' Perforation depth: measured 10056-10099' 10008-10020' 10030-10045' true vertical 8898-8934' 8857-8867' 8876-8888 ,, . Tubing (size, grade and measured depth) 5½", N-80, tbg @ 9207'MD; 4½", N-80, tbg w/tail f/9207-9326'.~D_c.;.::.',~ii&ci?'{3::]''~:' Packers and SSSV (type and measured depth) ~ .......... Baker SAB Pkr @ 9196'HD & Camco SSSV @ 2202'MD 12.Attachments Description summary of proposalX Detailed operations program ~ BOP sketch 13. Estimated d,~te for commencing operation Apri 1 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby,certify that the foregoing is true and correct to the best of my knowledge Commission Use Only Conditions of approval Approved by ORIGINAL SIGNED BY LONNiE C. SMITH Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Returned ~ Commissioner I Approva, No. by order of the commission Date Form 10-403 Rev 12-1-85 5-9/STAT17 W. J. Penrose (263-4511) Submit in triplicate DS 5-9 PROPOSED PERFORATIONS APl # 50-029-20254 PERMIT # 77-34 ARCO Alaska, Inc. proposes to perforate within the Sadlerochit interval in well 5-9. The proposed perforation intervals are as follows: Intervals to be Shot Shot Density Zone SS Interval 10099 -10125 MD 8870-8892 SS 4 SPF 1 22' Ref Log: BHCS 7-18-77 A 5000 PSI WP wireline lubricator and BOP, tested to 4000 PSI working pressure prior to the job, will be utilized for this operation. ii i i iiii 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF I I , I I, W I REL I NE BOP EQU I PMENT ii LIST OF CO-OWNERS Mr. M. H. Harris Standard Alaska Production Company P.O. Box 196612 Anchorage, AK 99519-6612 Mr. J. C. Bowen EXXON Company, U.S.A. P.O. Box 5025 Thousand Oaks, CA 91359 Mr. T. A. Edmondson Chevron U.S.A., Inc. P.O. Box 8200 Concord, CA 94520 Mr. W. E. Pritchard Mobil Oil Corporation P.O. Box 5444, Terminal Annex Denver, CO 80217 Mr. J. D. Owen Phillips Petroleum Company 8055 E. Tufts Avenue Parkway Denver, CO 80237 Mr. C. A. Dowden Marathon Oil Company P.O. Box 102380 Anchorage, AK 99510 Mr. R. W. Mullins Amerada Hess Corporation P.O. Box 2040 Tulsa, OK 74101 Mr. R. Iden ARCO Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Mr. Robert J. Chebul The Louisiana Land and Exploration Company Western Division 1675 Broadway, Suite 2100 Denver, CO 80202 Mr. S. M. Buchanan Division Petroleum Engineer Texaco, U.S.A. 3350 Wilshire Blvd. Los Angeles, CA 90010-9990 Mr. R. G. Hollis SHELL WESTERN E & P INC. Pacific Frontier Division P.O. Box 527 Houston, TX 77001 British Petroleum Alaska Exploration Company One Maritime Plaza, Suite 500 San Franciso, CA 94111 Attention: Joint Interest Corp. WJP4/IO DATE: JuLy 6, J987 REI'-'ERENCE: ARCO Ca~-ed HoLe t'-'inaL ~'1 .... : .... ,_,. F:'I. op F:' L (CCL/GR/I'-IP/'T'EHF:'.) Ruin ~, ~" "-' 'l .... 8 4-'8-'['.~7 F' I. op F:' I.~ (CCL "GR/HF'/'rEHP ) F;,'~n'1 '"=" ,a .~..-, ..' · .' I ..-~ ---- '1 .... 3-4 4'""1 S-8'? F:' I. op ,,I::',,L, (CCL/GR/HF'/TEHP,,) Run '1 ,.5' '~ .... 2 - 6 ,.,,~- - ~.,,. ''~ ''~ - ,_:q -", F' e r f , R e c o r d R u n 2 , 5" '2 .... 'i 6 6-'26-87 P e r 'f', R e c o r d F;:. u. n '~ ,5 ' -"'~ .5 .... ~'S 4 .... '! '~-.-87 F'I. op,F'~I .... (C..CL/Li.R/HF'/TEHF',) Run '"' 6-~ ~ 6 - 2 G-Ej"Z' F' e r f. i:;.', e c o r d I:;..' u n 'l ,5" ~ 6 .... 'i,~. '~. ,.,z. _.,...,.~ ,./, - ,..q ":', P e r' f ~ R e c o r d R u n 'i ,.~'";" .... '"'pin ) Ru.n '1, 5" '"' ":~, 20 6 .... '~,.,. ''~ ...- ..,°-? F' L o p , P , L. , ( H e mo'," y ,, · 16--. '~ 6 6.-~ ~ '~ --- 8'7F' !. o p. F'~ L., ( M e m o r y ,S' p i n. ) R u n ~ , :5" I::'Lea~e ~ig,", and re*urn 'i.'hej~!~[ac:h~:op¥ as' receipk of da*a. ~,~ i ,..j,.no/ R e c e i v e d B ¥ ....................................... ::~.'....L=...;.: .Z.' '~'~"~ Oil ~. (~a~; r>,, ,: C0~m~issi0rl HAVE A NICE DfiY~ Ro~anne Peek A T 0 -. ~ "~'., ''~...° TRAN3' ~87344 .~. A p p r o v e d ................................................................................. D .11 ~' T R I B U T I O N ."¢ c h ,~c h Sch 3' c h ,~;' r.: h ,'.';' c h 5' c h ,t,' c h ~' c h $ c h · ,-'"' C ~-:. ¥', + r .'a L I:-' i L e :s · "'.,- C.'. h e v. r o n I) & M :.,s.E x ..!: e n.~ i c, n F- x p [ o r a '1' i o n ,Il. ~ E × × c)l'i -,,-'"' Mob i L I::'hi !. L i p.s F'B WeLL Fi L e.'..; R & D $ o h i o .'.'.;"t:ate of ALa~:ka 'r e x a c o ARCO ALaska, Inc P.O. Box Anchormge, Atmska oo~ ~ 0 ~"~TE' August i", ~9°... ;_:~. . REFERENCE' ARCO Press ute Dafa ~ ~ 7-2~-86 ~ , j-~ _.- .'. , a: i c Grad ient Car,'~co 5-9 7-25-86 £~ra+,lc Gradien$ Ca¢,~co ~~-t3~ 7-26-86 ~.~+a+. . ir_ Gradien~ 2perrv-~un. ~i8-i 7-24-86 ... ~taiic Gradien! Camco i8-2 7-24-86 Siatic Gradie~t Camco F-=4-~,~, ~tatic Gradient Ca ¢,',c o ~1 8-5 ~ ~. oz F'Lea_--.e _~ig'n ar, d re~.urn the attached copy as receipt of data. 14AVE A Ni~~ L.; ~d a H u [~ Alaska Oil & An~h0rp. o¢Gas Cons. 60mml~sl0n ~ Ce'n±r4L Fi Le~ L-':t"'"L E'¢ ±~n~. i or, ....Exp I o'r.-~~: ~or.,' Ex .xon id;ara thon idob i .'. DATE: May R E F El F;,' F N C'- E: '?, i9""' · . o 0 ARCO P'res's-u'r'e D~'l;a 4 -" '7 _..,.,° 6 3: t' .... a -I- i r- 4--6 .... 86 ;~.? i: a t: i c Gl" a cl e ¥', i: · r a ,::.! e'n t' Grad i en't [] a fl'l C c:, C a i'l'l c 0 C a m c: o F' I. e a :i~ e ::'? i g n a 'nd 'r e 't' u ¥' 'n .t; I-] e a '(' i: a c h e d ,::: ,::, p >' ..:~ .s' 'r e ,::: e i p !' ,::) '1"' d a 't' ai., I:;.' ~:, r' e i \-" e cJ¥') ........ .,.., '? ............................................................. HAVE A NICE i::'AY! :I: 'r' ~',', a C a 'r 1. i n A"f'O--t 429F , F,.~N.:: 862[]5: -'--' I) ]: 3; T R I B U T ]: 0 N IC'l [ .:a .iF I-:: El ARCO Alaska, inc. Post Office E~-360 Anchorage, ~ ~a 99510 Telephone 907 277 5637 April 26, 1984 Reference: ARCO Cased Hole Finals · D.S. 1-25J 3-18-84' PFC/GR D.S. 3-19f 4-7-84 /~'"' Collar/Perf D.S. 3-22J 4-7-84 ~ Collar/Perf Log D.S. 3-23~"~'-4-7-84f Collar/Perf Log D.S. 5-9-~-' 4-8-84-/~ CFS/Temp Survey D.S. 7-16 ~ 3-10-84/ EPL D.S. 9-14~ 4-6-8477~ Collar/Perf Log D.S. 9-17~ 4-6-84/ Collar/Perf Log D S 9-20"-~'4-6-84/ Collar/Perf Log D S. 9-21 1-11-84- ACBL/VDL/Signature/GR D S. 9-23~ 3-8-84/ ACBL/VDL/Signature/GR D S. 9-25~* 4-2-84/ 'Epilog/Sandstone Analysis D S. 12-26 ..... ~2-19-84~ ACBL/VDL/Signature/GR D S 12-27/~3-6-84 / ACBL/VDL/Signature/GR D S 12-28/~3-28-84~' ACBL/VDL/Signature/GR D S. 12-28~ 3-30-84 Collar Log (used to cut tubing) ---D S. 13-11 4-4-84~ Collar/Perf Log -._D S. 13-11 4-4-84/..~ Diff Temp 5" DA Run ALL 5" GO Run 1 5" GO Run ALL 5" GO Run 3 5" GO Run 1 5" Sch Run 1 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" DA Run 1 5" DA 5" DA Run 1 5" DA Run 1 5" DA Run 1 5" DA Run 1 5" GO Run 1 5" GO Run 1 5" GO ~.~ s. 13-98 .S 13-98 S 13-98 S 13-98 S 13-98 D S. 13-98 D S. 13-98 iD S. 13-98 iD S. 13-98 ~D S. 13-98 5-8-83 / Epilog/Carbon-Oxygen 5-pass overlay5" DA 3-16-84~' CPL/GST/DIL (3 runs) w/listing 5" Sch no date' Epilog/overlay avg. CO, SI/CA, SW 5" DA 11-12-83~ Epilog/Carbon-Oxygen 6-pass overlay5" DA no date 2-13-84 2-19-84 2-18-84 3-30-84 2-14-84 Epilog/Compare Induction Curves 5" DA Epilog/Carbon-Oxygen 5-pass overlay5" DA GST Inelastic & Stations Run 3 5" Sch GST Capture & Activiation Run 3 5" Sch CH DIL Run 11 5" Sch CH CNL Run 4 5" Shc ~ 13-98 2-16-84 CH DIL Run 10 5" Sch 14-32~ 4-1-84./ Collar/Perf Log Run 1 5" GO 16-5-- 3-10-84/ Completion Record Run 2 5" Sch Please sign and return the attached copy as receipt of data. Have a Nice Day! Mobil E Phillips Prudhoe Bay Well Files DISTRIBUTION Kelly McFar land ATO-1429F Chevron D &M Trans. f~171 Dallas Drilling Ext. Exploration Exxon R& D Carolyn Smith Getty Sohio Marathon State of Alaska ARCO Alaska, inc. Post Offic"-~-='ox 360 Anchorag, laska 99510 Telephone 907 277 5637 April 13, 1984 Reference: ARCO Cased Hole Finals D.S. 2-17 3-5-84 Basket Flowmeter D.S. 4-16 3-10-84 Spinner D.S. 5-9 1-21-84 Caliper Log · D.S. 13-26 3-7-84 Diff Temp Run 1 5" Camco Run 1 5" Camco Run 2 5" Camco Run 1 5" Camco gn and return the attached copy as receipt of data. FRIDAY THE °13th is upon us - Have a Nice One! Kelly McFar land ATO-1429F Trans. # 131 DISTRIBUTION Chevron D&M Dallas Drilling Ext. Exploration Exxon Getty~ Marathon Mobil Mobil E & P Phillips Prudhoe Bay Well Files R& D Carolyn Smith Sohi~. ~..~ St¢Q~e/o.l~ ~la~<..~,`- ~ · ,_ , ~' ARCO Alaska, Inc. Post Office *--~, 360 Anchorage.. .~ska 99510 Telephone 907 277 5637 February 14, 1984 Reference: Arco Cased Hole Final D.S. 5-9 10-16-83 CET Run 1 5" Sch sign and return the attached copy as receipt of data. HAPPY VALENTINES DAY! Kelly McFar land ATO-1429F Trans. # 065 Chevron D & M Dallas Drilling Exxon Getty Marathon Mobil DISTRIBUTION North Geo~y Prudhoe Bay Caroline Smith Sohio State of,Alaska ARCO ALasKa, Post Offi¢ ~.× 360 /::nchorage. A~aska 995'1C~ Telephone 907 277 5637 December 8, 1983 Reference: Arco Cased Hole Final D.S. 1-10 11-4-83 Epilog D.S. 1-15 11-5-83 Epilog D.S. 5-9 11-23-83 Spinner Run 3 5" DA Run 3 5" DA Run 1 5" Otis Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans. # 661 Dallas Drilling Exxcn Getty Marathon Mobii DISTRIBUTION North C~ology Phillips Prudhoe Bay Sohio State of Alaska ARCO Alaska, Inc. Post Office ~.x 360 /~nchorage. ,ska 99510 Telephone 907 277 5637 November 30, 1983 Reference; Arco Cased Hole Finals D.S. 2-17 b.s. 7-6-83 10-27-83 Temperature Survey Fluid I.D./CCL Tie In Run 1 5" Camco Run 1 5" Otis ase sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans. # 627 Dallas Ge tuy Marathon Mobil D! STRIBUTION (~i;[ North 'GeOlogY '~. PhilliPs Prudhoe/B~ Caroline £x~ith Sohio State of ~aska ARCO Alaska, Inc. Post Office B( 50 Anchorage. AlasKa 99510 Telephone 907 277 5637 June 20, 1983 Reference: Arco Cased Hole Finals D.S. 1-10~ 5-12-83 D.S. 2-6--' 4-14-83 D.S. 3-1~-~ 5-8-83 D.S. 5-9~' 5-5-83 D. S. 5-16-~ 5-12-83 D.S. 7-7A ~ ..... 6-4-83~ 6-4-83L-~ ~ . ~ D~S. 11-6-- ~ ~ D.S. 12-16~ .... 5-29-83~ -7-83./ ~ 6- i~ 6-13-83 · D.S. 14-28 / 6-~3~-83 D.S. 15-6''' 5-6-83 CH CNL CH CNL CH CNL CH CNL CH CNL CPL/Producibility w/Listing CPL/Volan w/Listing JIP~PLOG printout 5-7-83 CH CNL 2-21-83 ACBL/VDL/$ig/GR CH CNL CBL after CBL Temperature Log CH CNL Run 2 5" Sch Run 4 5" Sch Run 3 5" Sch Run 2 5" Sch Run 3 5" Sch 5" Sch 5" Sch Sch Run 2 5" Sch Run 1 5" DA Run 1 5" Sch Run 2 5" Sch Run 4 5" Sch Run 3 5" Sch Run 3 5" Sch Run 9 5" Sch Run 11 5" Sch Run 1 5" Otis Run 2 5" Sch /Pleasesign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. ~ 376 DISTRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLING GETTY PHILLIPS D & M SOHIO STATE OF ALAS~ MA~THON DALLAS CHEVRON CAROLINE SMITH ARCO Oil and Gas Company North Ala?'-~ District Post Offic ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 14, 1980 Reference: ARCO Magentic Ts.pes D.S. 1-1 9/5/80 Tape #102144 ,~Z~_.~Y.~S. 5~-9-~v) 9/1/80 Tape #102165 D.S. 2-17 8/8/80 Tape #102164 R~m 1 D.S. 5-10 10/4/80 Tape #61062 Run 2 D.S. 4-7 10/1/80 Tape #61057 Run 4 ease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #805 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Oil and Gas Company is a Division ol AllanticRichfieldCompany AI~ ~tr~ct Post Ollice B'~'360 Anchorage. A, .~a 99510 Telephone 907 277 5637 April 24, 1980 .! .,. Reference' ARCO Cased?Hol'c, Logs · D.S. 1-1 3/25/80 CNL' Run 1 S" D.S. 2-8 5/21/80 CCL/Perf Run 3 5" D.'S ...... _$~,~ .3/25/80! CNL : . Run 1 ...... D'~['"g"[ ~S.;.9~,-~[.j~ 3/22/80j CNL '. Run I 5" ...... ~"~': ....... ~:6 3/1/80"i Spectralog Run 1 /~D.S. 12-6 1/29/80i ~Col. lar Run 2 2 Pleas sign and return-!the.attached copy of data. ' K. J. Sahlstrom. ', ., North Engineering .,,. 11 & 5" (same log) as receipt TRANSMITTAL #265 DISTRIBUTION North Geology R&D Drilling , Eng. ~knager D&M C<:olo~Q~ State of Alaska E~on Hobil Getty Phillips Sohio Harathon March 30, 1979 -... Reference' · ... EncloSed are the following cased, hole logs' Sonan 9/20/78 Sonan 10/22/78 EPL 1/30/79 GOC log 11/11/78 ~T 12/ .;/78 CCL CNL 1/ 8/79 CNL 2/ 4/79 CBL/VI)L 2/ 4/7'9 TDT 10/17/77 TDT 10/19/78 · Spinner 1/25/79 Please sign and retrain the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITFAL # 141 DISTRIBOTION North Geology Drilling. Eng. Manager R 6 D Geology-. State of Alaska D & ~i ]~xxon . Mobil Getty Sohio Marathon Phillips Chevron North Ala~,k-'a District Post OUice F--*'~' 330 Anchorage,, ~,ska Telephone 907 277 5637 ~anuary 24, 1979 Reference: Enclosed are the following logs: ( C~'~' ~- 4- ~"~'(r~'4. DS ~ ' GR/N 11/12/78 '~ Spinner 6/6/78 CCI_, 12/27/78 Please sign and retu'rn the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSbIITTAL #043 DISTRIBUTION North Geology Drilling Eng. Manager R&D Geology State of Alaska D&M Exxon Sohio Mobil Marathon Phillips Chevron Getty · North American Producing .,Oivision F~orth A!ask, 'strict Pos~ Office Anchorage, Alaska 99510 Te[ephone 907 277 5837 November 16, 1978 Reference: Enclosed are the following l°gs: D.S. #4-2 D,'S. #7-5 D.S. #4-2 ' D.S. #7-2 D.S. #4-2 D.S. #5-1 D.S. #7-5 D.S. #9-19 D.S. #5-1 D.S. #7-4 D.S. #9-17 D.S. #7-4 D.S. #9-9 Fluid Density 9/20/78 Diff. Temp. 10/5/78 CNn 10/10/78 Flow Meter 10/5/78 CBL/VDL/CR' 10/2/78 Fluid Density 10/5/78 Neutron 10/12/78 CBL/VDL/GR 10/9/78 Fluid Density 10/24/78 Flow Meter 10/12/78 CBL/VDL/GR 9/15/78 Dual Spaced Neutron 10/26/78 Noise Log 9/30/78 Neutron 10/28/78 Please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering RECEIVED TRANSMITTAL #566 Atlanti~RichfieldCompany North American ,Producing Division North Alas~<,-~-~istrict Post Office. ~(360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 2, 1978 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Procupine Drive Anchorage, Alaska 99501 Subject: DS 5-7 Permit No. 77-13 ermit No. 77-24 ermit No. 77-34 DS 5-11 Permit No. 77-30 DS 5-15 Permit No. 77-35 DS 5-16 Permit No. 77-43 Dear Sir: Enclosed please find a Completion Report for the above- mentioned wells. Very truly yours, Frank M. Brown District Drilling Supervisor /gk Attachments SUBMIT IN DUPLICATE* STATE OF ALASKA ',s< ..... ~h~r OIL AND GAS CONSERVATION COMMITTEE II I I I II I WELk cOMPLETION OR RECOMPLETION REPORT AND LOG* ' ........ WELl. ~ELL ~ DRY Other b. TYPE OF COMPLE~ON: W~:LL ~ OVE~ Ex n.%CK nEsvm Other Perforated 2. NAME OF OPERATOR Atlantic Richfield .Company 3. ADDRESS OF OPERATOR P.O. Box 360; Anchorage. Ala.qka qq~ln 4. L0c^'rt0N o1~' wELL '(Report"l~Cation c~early an~l in accordance with amy-St--a~e requirements)* 5. API NUIMJgtLICAL CODE 50-029-20254 6. LEASE DF-~IGNATION AND SERIAL NO. ADL 28326 7. 1F INDIA.N, ALLOTTI:iE OiL 'I'i[IBE NAALE At surface 2546'N & 210'E of SW cr Sec. 32, At top prod. interval reported below 1626'N & 1629'N of SE cr Sec. 32, At total depth 1421'N a 1341'W of SE cr Sec. 32, TllN, R15E, UM TllN, R15E, UM TllN, R15E, UM 8. UNIT,FAiUVI Ot( LEASE iN AME Prudhoe Bay Unit 9. 'WELL NO. DS 5-9 (33-32-11-15) 10.~'IELD.,43qD POC~, OR vruanoe ~ay ~~Td Prudhoe Oil Pool 11. SEC., T., R., iVI., ([~OTTOM HOLE ODd Ertl'IV E) Sec. 32, TllN, R15E,UM 12. PE~'IIT NO. 77-34 TOTAL DE--H, N~ & TV~9. PLUG, BACK MD & ~D~. ~ 1ViULT~LE CO~L., [ 21, ' INTER~'AI.S 'DR[LI,ED / HOW 1VI3klN' Y* ~ ROTARY TOOLS [ CABI,E 10,230'MD, 9045'TV~ 10,176'MD, 8999~TVD Single I All PRODUCING ~VAL(S). OF ~ISCO~P~TIO~--TO~, BOSOM, NA~E (MD ANDTVD)' t, 23. WAS DttlECTIONAL , SUIIVEY MADE Top Safllerochit 9565'MD, 8482'TVD Base Sadlerochit 10,14.0'MD, 8968'TVD i Yes 24. TYPE ELECTRIC AND OTIIEI~ LOGS RUN DIL/SP, CASi~{C; SIZE 20" . ,,.1.,3-3/8" 9-5/8:' 26. SIZ~ 28..pERFOrATiONS OP~LN TO PRODUCTION 10,079'-10,099' ]t0,056' ~10,079' 10,030'-10,045' 10,008'-10,020' 9963'-9991' BHCS/GR/CAL, FDC/CNL/GR/CAL, · II · l _ CASING RECORD (Report all strings set in well) - %'EIGHT, LB, FT. ~ GI{ADE I DEPTH SET (NII)) HOLE SIZE 94# [ H-401 110', 32" 72# ButtI MN'-8q 2750' 47~ ButtJN-~0~ 10,217' ' ,oo:gq LINE~ TOP (2,ID) EOTTOA/I (A,ID) SACKS CEAIEXT* 17-1/2 i' -~4 ' ,]2 (interval, size and nurnber) with 4 shOts per fo. GR/CNL/CCL , ,. CEi\ILNTiNG t~ECOILI) ! £~?,'IOUNT PULLED 2al.~x parma~r~s~ cm_J I ii 27. TUBING RECO N.D SIZE DEPTI'I SEI' (3,5D~ ~ I'ACI:E[~ SET (MD) 5-1/2 ' 9326" 9196 ' i , , ACID,Si:CT, b'i:A::'tJHE, CEL,ILNT DEPTIi 1N'!E~VAL (MD~ N/A )t oIL--BBL. G ~%S--A1CF. 11333.8 l GAS--MCF. I 11459 ., 30. PItODUCTION /"""~AT'~ F.[RST-~lC~©DUCTION [ P~ODUCTION NiEi[{OD (FiOWii:a, ffas lifE, pdmping--si ..... d type Of pump, 1/20/78) [ Flowing ~'~T~-~[ ~OURS TEST~ ' [CI-iOXE SIZE [PeOD'N FOR 1/25/78 2 1389/64 FLOW', TUBIN~ CAg~G PRESSURE [CALC~T~ OI~BBL, !~ESS. t2,i-HOUR BATE 836 -- > 16005 3~. D~SPOSlTION OF GaS (Soid~ ~ed ]°'r ~el, ~e~ted, etc.) Reinjected 32. LIST OF ATTACHMENTS i Producin~ 954.9 [ 23 , , i 716 WAq~---IIBL. [OIL GI{~VITY-~I (CO~.) l ..... 275 I 27_g TE~T WITNESNED BY Production Operations ~3. I hereby certify that the foregotng~and attached tnformatiDn is complete and correct as determined from all-available r,c,rds SIGN ~ , .- TITLE District_~_~~er DATE *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and iocj on all types of lands and leases in Alaska. item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in ether spaces on this form and in any attachments Items 20, and 22:: If this well is completed for separatc production from more than one interval zone (multiple completion), so state ~n tten~ 20, and in ite,'~ 2? show the p~cJL~cir~.r3 interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the intervol ret)erred ir~ item 30 Submit a separate report (page) on this form, adequately identified, for each additior~al ir~te~val to be separately produce:], show- ing the additional data pertinent to such interval. .. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage ceme~qting and~ the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). , , 34. SUMMAI~.Y OF FORMATION TE,'S'I'S IN('L,LII)IN(; INTERV^L TF, STED. I-'I'{E,'-i..StJIIE DATA A'N'D"!q..ECOVEP, IES OF OIL. GAS. 35. G~OLOG IC M A RKIKRS VVATT2R AND MUD NA1VI~ .q~ COIIE DA'I'A. A'I'I'ACII llRIEF D,~-,SCRIPITION.q O1;' LITIIOLOGY. POtqO.qlTY. FItACTURFZ:.S. AF~PA.P,-~,NT DI'PS A'ND I')E'I'EC'TEI) t411OWS OF OIL. GA.S OR WATETI1. , ,, ~ ,, , ........ State of Alaska From J. lfcll Naillc' · -:'~;,~} il'cd ]~crc~.:ith are the following for t]Xe .~ubjcct well- Scal~ Xerox Sep.j.a Acj. d or Fracture ]keatment Log · B[.IP Buildup & Flow Profile Surve): ];orchole Geomet~D~ Log Carbon Oxygen Log Casing Collar Log Cement Bond Log ...... Compensated Neutron Log - Cased Itolc --Core ;~alysis - Interval Core No. · Corc Description C~IC) - Interval Col-c Description (Cony.) - Core No. Directional Su~gy- Gyro - Single Shot - ']~ng~necring Production' Log .... Flu ].d Analysis .... : .... .}=luJd D~nsity · ** Ad~tional GOR' reports ..... ].ocation Plat Monthly t~'cll Test Data Nud Log Perforating Record . State Reservoir Pressure Report Surveillance Reports ..... Temperature Transient Pressure'Surveys ...... 'fVD Logs - ~tel Induction Latm-olog ..... - Compensated Formation Density I,og - Compensated Ncutron-Fo~qnation Density Log . - Borc]~o].c Compensated Sonic - Porosity Log Ih" ./ /' ., ,~. ~ ~ ~ ~- ~.,c. Rctta'n kccc. p~. To: Ms R. A. Loguc At]antic Ri.c]~fJ. cld Company P. O. t!o>: 360 Anc]~ora~c, Alaska 995]0 ])ate' /' AtlanticRichtieldCompany Norlh American Producing Division North Alas~3istrict Post Office × 360 Anchora§e, Alaska 99510 .. ~ ~, Telephone 907 277 5637 · ~¢'~ ~,. ~ 4~ ' . Reference' Enclosed are copies of the following Transient Pressure Surveys- · / 5-78 7-78 D.S. #5-12c-6-9-78 D.S. #5-14~'~6-13-78 ~ ,~)S' ¢'--/'~.~_ Please si_gn and retu~ attached copy of tr~smittal as receipt of data. Very truly yours, R.A. Logue North Operations Engineering Transmittal-#384 MILE 4. NORTH RD. BOX 3453 KENAI. ALASKA 99611 PH. 1907) 283'4403 Company Well Location ATLANTIC RICHFIELD COMPANY Location #9 NORTH SLOPE Field PRUDHOE BAY Formation SADLEROCHIT Pressure 1000 2000 3000 Z. 000 i P.'O. BOX 4-15§1 ANCHORAGE, ALASKA TELEPHONE:{907) 2,76;3.~. Z 5 TLX 0D02-6481 DRILL SITE #5 State ALASKA Date 8 NOVEMBER 1977 40584 40585 M.D. 5 $ PRESS. PRESS. GRADIENT -0- -64 1422 1421 ,. 2064 2000 2083 2079 .~19 4143 4000 2709 2713 .317 6644 6000 3409 3412 .350 9076 .8000 4079 4085 .336 10016 3800 4339 4341 .320 Well Information Bev. -64 Datum -8800 Zero Pt. T.H. Csg.,9 5/.:~o 1021'/ .... t 0 Tbg. 5~ to 9326 __to Perfs. Pkr. PBTD ~ Csg Press Oil Level H20 Level Well status Prod rate Date last test Status of well last test Prod. rate last test · Press. last test Press. this test Press. change Element Nos. 40584 Calib. No. Remarks BHT = 190 40585 S.V. @ 2202 'M.D. / North Alaska District Engineering 2'0' From' J. A. Rochon/D. R. Jackson Date' January 1.1,1978 Well Name' · D. S Transmitted herewith are the fol.lm~ing for the subject well' Run No. Scale- Xerox Sepia BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Conrpensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony..) - Core No. Directional SurVey ~ Gyro Single Shot Multishot Drill Stem Test - Test No. Dual InductionLaterolog Formation Density Log Formation Density Log/Ga~na Ray Ganma Ray/CCL Laterolog Location Plat b~crolaterolog Microlog Mudlog - Interval SamPle Log .(A.R. C0.) - Interval Synergetic Log Tk~-DIL TVD-Porosity Log Initial Transient Pressure_Survay:.Noy.8 eao Receipt Acknowledged For: Date' Please return receipt to' ,, / / Attn: },,k. Donovan Jackson 'Atlantic Richfield Co~m~y North Alaska EngineerLng P. O. Box 360 Anchorage, Alaska 99510 By' #753 MILE 4, NORTH RD. BOX 3453 KENAI. ALASKA 99611 PH. {907) 283-4403 P.O. BOX 4'1551 ANCHORAGE, ALASKA 99509 TELEPHONE {907) 276'3525 TLX 0902'6481 Company Well Location ATLANTIC RICHFIELD COMPANY NORTH SLOPE Field Formation 1000 Press u re 2000 3OO0 Location DRILL SITE #5 PRUDHOE BAY SADLEROCHIT 4000 State ALASKA Date 8 NOVEMBER 1977 40584 40585 M.D. $ 5 . PRESS. PRESS. GRADIENT 10016 · 8800 4339 4341 9780 8600 4275 4278 .315 9076 6644 2064 8000 4090 4095 .305 -6000 3431 3436 .3~0 -2000 2113 · 2116 .330 -0- -64 1422 1421 .336 Dev. -64 ., Well Information Datum -8800 Zero Pt T.H. Csg.9 5/8~o 10217., ~to Tbg. 5Z: to 9326 , ~to Perfs. Pkr. PBTD __ Csg Press Oil Level H20 Level Well status Prod rate 40585 Date last test Status of well last test Prod. rat, e last test Press. last test Press. this test Press. change Element Nos. 40584 Calib. No. Remarks BHT = 190" S.V. @ 2202' M.D. Date: .~,.:.!?~,,~,~.~:~i;"~7!~:? ~'~,-: North Alaska District F:,n[~inecring ~*.'., ~ "- From: Am,,ht;v'~¥~ Well N~e: ~ Januar~ 9,1918 J. A. Rochon/D. R. Jackson Transmitted herewith are the following for the subject well: t~n No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamna Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis-- Interval Core No. Core DesCription (SWC) - Interval Core Description (Cony.) - Core No. Directional Su1~ey - Gyro Single Shot ~Mltishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gmmna Ray Gamma Ray/CCL Laterolog Location Plat Microlaterolog Microlog bMdlog - Interval Sanple Log (A.R. Co.-~ - Interval ' Synergetic Log TVD-DIL TVD-Porosity Log Fluid Density Xerox Sepia BL. Line ea. ea. 'Receipt Acknowledged For: Date: Please retmm receipt to: · Attnf ~'~. Ik~novan .Jackson Atld4~tic Richfield Co~any North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 By: // #728 To' North Alaska District Engineering T RANSM I TTAL From: J. A. Rochon/D. R. Jackson Date: December 19,1977 Well Name' D.S. 5-9 Transmitted herewith are the following for the subject well' Run No. Scale' Single ShOt ~'~ltishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma'Ray Gamma Ray/CCL Laterolog Location Plat b~crolaterolog Microlog b~dlog - Interval Sample Log (A.R. Co.) - Interval Synergetic Log TVD-DtL ,, · TVD-Porosity Log- BHC Sonic/Caliper Log BHC Sonic/Caliper - GammaRay Log BHC Sonic/GammaRay Log Caliper/CCL Cement Bond Log/VDL Compensated FormationDensity Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Xerox Sepia BL Line ea. ___J ea. Receipt Aclmowledged For' Date' Please return receipt to' . ? Attn' ~r. Dohovan Jackson Atlantic Richfield Company~ North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 By' December 15, 1977 Mr. Russell A. Douglass State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: It has come to my attention recently that wells 5-8 thru 5-16 as well as DS 9-13 thru 9-16 will not go on production until mid January or Febru.ary. _ So at-~hi-s time I will submit o~{J.y thd ' 'Su~qSsequent Sundry notices and submit completion reports as soon as the-wells go on production. Very truly yours, Karla K. Lenz Engineering Associate KKL/am December 15, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 pOrcupine Drive Anchorage, Alaska 99501 Subject: D~~ (22-6-10.-15) Permit No. 77-24 ,C"~'S~ 5-9-'5' (33-32-11-15) Permit No -/7-34 "'"-~--~d (14-32-11-15) Permit No 77-45 DS 5-11 (12-31-11-15)Permit No. 77-30 DS 5-12 (41-31-11-15) Permit No. 77-14 DS 5-13 (43-29-11-15) Permit No. 77-26 DS 5-14 (13-29-11-15) Permit No. 77-33 DS 5-15 (43-30-11-15) Permit No. 77-35 DS 5-16 (41-30-11-15) Permit No. 77-43 Dear Sir: Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above mentioned wells. Very truly yours, District Drilling Engineer /am Enclosures Form~l 0-403 REV. 1-10~73 Subml t "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) OIL r'~ GAS D OTHER WELLI-~ WELL 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.0. Box 360; Anchorage, A1 aska 4. LOCATION OF WELL At surface 99510 2546'N & 210'E of SW cr Sec. 32, TllN, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 64' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 6, LEASE DESIGNATION AND SERIAL NO, ADL 28326 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 5-9 (33-32-11-15) 10, FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) SeC, 32, TllN: R15E: UM 12. PERMIT NO. 77-34 )crt, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL ~ FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) Perforati oR .. {NOTE; Report results of multiple completion on Well Coml31etlon or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all I~ertlnent details, and give pertinent dates, including estimated date of starting any proposed work. Began perf operations 11/5/77. Tstd tree, csg & wireline BOP's. Pulled dummy valve. Perf'd intervals 10,079' - 10,099', 10,056' - 10,079', 10,030' - 10,045', 10,008' - 10,020', 9976' - 9991', 9963' - 9976' w/4 shots per ft. Ran Amerada press bombs & FDL. F1 owed well. Ran & set ball valve @ 2202'. Tstd balance & control lines to 5000 psi OK. Bled press above ball valve, held OK. Installed & tstd tree cap to 5000 psi OK. Released well to Production Dept. 11/19/77. hereby certify that the foregoing Is true and correct TITLE Di stri ct Drl 9- Engineer DATE (This space for State office use) APPROVED BM CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side TH RU: ~- DEPARTMENT OF NATURAL RESOURCES ~ ,Division of Oil and Gas Conservation O.K. Gllbreth, Jr. ~' ~ovember 22, 1~77 DI rector ~ Hoyle tt. Hami Iron Chief Petroleum Enginee rtV' ' Harold R. Hawkins Petroleum Inspector To witness - subsurface safety(SSSV) valves and surface safety valves(SSV) ARCO - PRUDHOE BAY Drtll Site 5-8/5-9/5-10/5-11/ 5-12/5-13/5-14/5-15/5-16 November 16 - I went to the slope by Wlen Airline at 10:O0 a.m. arriving on slope at II:30 a.m. and Arco Base Camp at 12:30 p.m. Purpose of trip to witness tests on subsurface safety valves and surface safety valves for Arco on Drill Site 5. There were 9 SSSV's and SSV's to test. Average test time on these wells was I 1/2 hours per well including observation. Between tests it took 2 to 4 1/2 hours to manifold up on another well, DRILL We// TUB lNG TEBT ISSSV S I TE NO. SSSV SSV PS I PS I DEPTtt , 5 8 OK OK 1400 900 2166 5 g OK OK 1400 900 2202 5 I0 OK OK 1400 900 2204 5 11 OK OK 1400 900 2216 5 12 OK OK 1400 900 2184 5 13 OK i OK 1400 900 2246 5 14 OK OK 1400 900 2250 5 15 OK OK 1400 900 2222 5, 16 OK OK 1400 900 2256 ~/hen Well No. 13 test's were started Jhere was a break in the bleed line. This caused a 20 hour delay in testing. The clean up operations resulting from the break are on separate report. November 1~ - Tests were completed. All SSSV's and SSV's for Arco on Drill Site 5. There were no leaks. Tests were satisfactory. fad Drlg. Permit No. Opera tor--~/~' ?-~_) Ala_.,a Oil and Gas Conservation Commi~__e Field Inspection Report Wel 1/P1 a tfm Sec T R Represented byj~/j~,~ ~/,..,~,~,/z= _Name & Satisfactory Type Inspection Yes No Item ( ) Location,General () () () () () () () () 1. Well Sign 2. General Housekeeping 3. Reserve Pit-( )open( )filled 4. Rig ( ) Safety Valve Tests 5. Surface-No. Wells 6. Subsurface-No. Wells__/__ ( ) Well Test Data 7. Well Nos. , , , 8. Hrs. obser , , , 9. BS&W , , , 10. Gr. Bbls. ( ) Final Abandonment () () () ()' () () () () Satisfactory Type Inspection Yes No Item ( ) BOPE iests () () () () () () () () () () () () () () () () () () () () () () () () () () 15. "Casing set @ 16. Test fluid-( )wt'r.~(-)mud ( ) oil l?. Master Hvd. Control Sys.- psia 18. N? btls .......... psig 19 REmote Controls 20. Drillinfl spool-__ ..... "outlets 21. Kill Line-( )Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs flus 24. Chokes-( )Remote( )P(is.(-)-~,d,i.- 25. Test Plug-( )Wellhd( )csa( )none 26. Annular Preventer, ...... _psim 27. Blind Rams, psiq ( ) ( ) ll. P&A Marker ( ) ( ) 28. Pipe Rams psig ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock .... psig ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psig ( ) ( ) 14. Pad leveled ( ) ( ) 31. Safety Floor valves-( )BV ( )Dart Total inspection observation time / ~-~.~_.rF~/days Total number leaks and/or equip, failures/~_~~_.. -Remarks ~_~ :'-5 LX'. TX~5 Z~ z~/F ~ ?~ T~z) ~ /~ ~Z~.~,'~i~~J_ .__j-~-~ cc' /~?~r?~' ,./~/X,./XS'f Not~fy in days or wh~en read~- Ingpected by~_~././l~//~.!~___Date/~ -~~-~-~ To' North Alaska District Engineering. TRANSMITTAL From' J. A. Rochon/D. R. Jackson Date' s.pt.mh.r 27; ]q77 Well Name' Transmitted herewith are the following for the subject well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core ~lnalysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. DireCtional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gamma Ray/~Neutron Laterolog Location Plat Microlaterolog Microlog Mudlog -Interval Sample Log (A.R. Co.) -' Interval Synergetic Log TVD-DIL TVD-Porosity Log .p,S, 5-~ Xerox Sepia BL Line ~ ea / ea ReceiPt Ac~ow~_h~dge~Cfor: ,=, ~ ~ ate' Please re~u~ec~pt to' 'Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 ~599 North Alaska District Engineering TRANSMI TTAL To' From' J. A. Rochon/D. R. Jackson Date' August 17,1977 Well Name' D.S. 5-9 Transmitted herewith are the following for the subject well' Run No. Scale BHC Sonic/Caliper Log 1 BttC Sonic/Caliper - Garmna Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log 1 Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. DireCtional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. 1 Dual Induction Laterolog Formation Density Log Formation Density Log/Gan~na Ray Gamma Ray/CCL Laterolog Location Plat Microlaterolog Microlog Mudlog- Inten~al Sample Log (A. R. Co7-) - In'terval Synergetic Log TVD- D I L 2IfD-Porosity Log Xerox Sepia BL Line Iea I ea _ ! ea .... 1 ea Receipt Acknowledged For' Date' PI_ease return receipt to: Atl I~chfield Company North Alaska Engineering ~Ianager P. O. Box 360 ~chorage, Alaska 99510 t~566 AtlanticRichfieldCompany .: North Amer~an Producing Division North Aiast istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 11, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject~3-32-11-15) ~. 77-34 D.S. 5-14 (13-29-11-15) Permit No. 77-33 D.S. 9-13 (13-7-10-16) Permit No. 77-8 Dear Sir- Enclosed please find a Completion Report along with the Drilling History and Multi-Shot Directional Survey for the above mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /am Enclosure SUBMIT IN DUP~.,~a.,t£* STATE OF ALASKA ~m, s'~ r il(, t ~ o r'~.q o1'1 rcvei~t' side ~ 5. API NU~ltlCAL Ct)DE o~ ~v ~s co~s~v~no~ comm~wr~e 50-029-20254 WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: ou, ~ 6~s ~ WELl. WELL ~ DRY Other b. TYPE OF COMPLE~ON: WELI. OVER EN BACK RESVR. Other ~ , 2. ~,.~ o~ o,~,~o~ Prudhoe Bay Unit Atlantic Richfield Company a. ,~ o, o~,~o~ . BS 5-9 (33-32-11-15) P.0. Box 360; Anchorage, Alaska 99510 4, LOC~r~ON OF WELL ~(Report tocation cteari~ and in accordance with any State requireme, t~)* At ~ufface 2546'N S 210'E of S~ cr Sec. 32, IllN, R15E, U~ At top prod. interval reported below 1626'N i 1629'~ of SE cr Sec. 32, TllN, R15E, U~ At total dep~ 1421'N i 1341'~ of SE cr Sec. 32, TllN, R15E, U~ ~.~~o. 77-34 7/5/77 7/20/77 7/26/77 64' RKB _. 18. TOTAL DE.H, 7v~ & TVD~9. PLUG, .B~CK MD & ~D~. ~ ~ULT~LE CO~L., 21. 10,230'~B, 9045' . ,176'NB, 8999' S~ngle ALL . ~. PRODUCING ~N~RVAL(S), OF ~IS CO,~P~TIO~TO~, BOSOM, NA~E (MD AND ~)~ ,23. WAS D!RECTIONAL ~ SUI~VEY MADE Top Sadlerochit 9565'~, 8482'TV~ ~ Yes BaSe Sadlerochit 10,140'ND, 8968'TV~ 6. LEASE DE2SIGNATiON AND SERLAL biO, ADL 28326 7, 1F INDIA2q, ALLOTTEE OR 'i'}IlBE NA~LE 10. FIELD AND POOL, O1{ WILDC&T Prudhoe Bay Fi~ld - Prudhoe u~ 1 Pnn~ 11. SEC., T., t{,, M., (BOTTOM HOLE O]_kJ EC~I'IV E ) Sec. 32, TllN, R15E, UM 24, TYPE ELECTRIC AND OTItE_I% LOGS RUN DIL/SP, BHCS/GR/CAL, FDC/CNL/GR/CAL, GR/CNL/CCL 2~5. ' _ ~ i CASING RECORD (Report all strings set in well) C~S124C; SIZE 72# Butt 94# H-40I 20" !.,,~- 3/8I' MN-80 ' __ N-,80a ] i ~500-95 47# Butt ii 26 .LJNEX n m I i i 28. PERFORATIONS OP~N TO PRODUCTION (interval, NA DEPTH SET (MD) ' 110~ 2750' 10,217'. i S~CKS CEMENT* ii Size alld nurnber) i i ii ii ii i m 30, PR. ODUCTION HOLE sIZE !,' CISMLNTINC} 32" 281 sx Permafrost Cmt , 17½" 15000 sx Arcticset Cmt 12~".[1100 sx Class G Cmt I 27. TU BiNC; SCiiEE2'¢ (~ID~ SIZE DEl>TI{ S~;'1' 29, ACID, i:CT, D~I'Ii IN2~V.~ (MD) ] /C,I'.mUN I' AND I',.!ND 01" MA.'Li<YIiAL USED 1-- FkL%L,t V L.W,. CI-!OZ<E SiZE PP~OD'N FOR OIL--EEL. GAS--AICF, 'I'E:S:I~ Pigi~IOD FLO~V, T~BING CA~qG PRESSURE [cALC~T~ OI~BBL. GAS--RICF. 31.a~s?osmuoN oF6,s (Sold, u~ed for lu¢[, vented, etc.) A?.'IOUN T PULLED SET I(_iA S-OII~ lt,kTIO WATER--1..~BL. [ OIL GR A. VITY-API (CORR.) 1. 1 IYE~T WITNESSED BY 32. LIST OF ATTACHMENTS Drilling History, Directional Survey 33. I hereby certify that th~$ foregoing and attached information tg complete and correct as determined fr(,m all-~vallab~e recurds *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete arid correct well completion report end log or'~ all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given ~n c, ther spaces on this form and in any attach~r~ents. Items 20, and 22:: If this well is completed for separate f3rccJucti©n from more than one ~nterval zone (multiple completion), so state ~n item 20, and ir'~ item 22 show the p~cJvc*~,.~l interval, or i~'~tervals, top(s), bottom(s) and name (s) (if any) for only the interv,~l ref~orted in ~,'~e~'~ 30. ,.Sui'~r-nit a separate report (page) on this form, adequately identified, for each additior~al interval to be seperately produce,J, show- ing the adlditional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the dei-ails of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. ~UMMAItY (IF' b'¢)ItS/IA'I'I()N 'l'I~k.'~'l'.'q INt'I,UI)IN¢; IN'I'FTI{VAL 'I'F~q'I'E~). I>I~tJI~E D'A'I'A ~ ~ECOVElllY~ ()F OIL GA~. 35. G~G IO MARK~ WATer AND MUD , ~ , 3~. COIIE DATA. Aq'I'ACI[ I]RIE~ D~BIP~ONS OF LITIIOLOGY. POROSITY. FIIAc~R~. ~p~NT DIPS AND D~I'ECq'EI) NIIOWS OF OIL. GKS OI1 xVA~{. - ., DRILLING HISTORY DS 5-9 (33-32-11-15) API 50-029-20254, ADL 28326, Permit No. 77-34 .. Spud @ 1600 hrs 7/5/77. Drld 17½" hole to 2750'. Circ & cond for csg. RU & ran 13-3/8"'72# MN-80 w/float shoe @ 2710', FC @ 2627'. Cmtd w/5000 sx Arcticset cmt, slurry 15.2 ppg. Displ cmt w/29 bbls mud. Did 40 sx top job. NU & tstd csg OK. Drld 12¼" hol'e to 10,200'. Circ & cond to log. Dropped multishot. Ran DIL/SP, BHCS/GR/CAL, FDC/CNL/GR/CAL. Drld to 10,230'. RU & ran 9-5/8" 47# butt csg w/ float shoe @ 10,217. Cmtd w/1100sx Class G cmt w/0.75% D65 & 0.2% D13, slurry 15.8 ppg. Displ cmt w/mud. Bumped plug w/2OOOpsi', floats held OK. Tstd 9-5/8" pkoff to 5000psi OK. Circ thru upper FO @ 2335'. Closed & tstd FO to 2000psi OK. Circ thru btm FO. Closed & tstd btm FO. Arctic Packed 9-5/8" x 13-3/8" annul thru lower FOo Closed & tstd both FO's to 3000psi OK. Displ mud W/wtr until clean. Displ wtr w/10.6 CaC1 wtr. Ran GR log. Ran gauge ring & junk bskt. Ran 5½" tb§ string W/shear su~ @ 9326', Baker pkr @ 9196', Bal-O nipple @ 2202'. Displ tbg to diesel. Dropped ball & set pkr. ND BOP & NU xmas tree. Pulled dummy valve. Ran CCL & dummy gun. 'Ran dummy valve. Tstd control lines to 5000psi OK. Press tbg & anul for long term tbg tst."Released ri.g @ 1300 hrs 7/26/77. .gyro/data WELL NO:5-09 DRILLSITE#5 PRUDHOE BAY FIELD, E.O.A. Gyro Multishot Survey Of 3.5" Tubing Survey date · 28 MARCH 1996 Job number' AK0396C334 RECEIVED JUN 1 1 1996 Alaska Oil & Gas Cons. Commission Anchorage SR334.DOC GyrOdata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 May 13, 1996 Arco Alaska, Inc. B.P. Exploration (Alaska) Inc. ~Petrotechnical Data Center, MB 3-3 900 E. Benson Anchorage, AK 99519-6612 Re: DRILLSITE 5, WELL #5-09, PRIJDEHOE BAY FIELD E.O.A. Enclosed please find one (1) original and four (4) copies and one (1) disk of the completed survey of Well#5-09 We would like to take this opportunity to thank you for using Gyrodata and we look forward to serving you in the furore. Sincerely, Operations Manager RS/fec Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK0396C334 . DISCUSSION, SURVEY CERTIFICATION SHEET 2. 'SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR334.DOC gyro/data 1. DISCUSSION , SURVEY CERTIFICATION SHEET SR334.DOC gyro/data DISCUSSION JOB NUMBER: AK0396C334 Tool 080 was run in well# 5-09 on ATLAS 5/16" Wireline inside casing. The survey was run without problems. SR334.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER' AK0396C334 The data for ~this surVey and the Calculations for this SurveY were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR334.DOC gyro/data 2. SURVEY DETAILS SR334.DOC ,,gyro/data' SURVEY DETAILS JOB NUMBER' AK0396C334 CLIENT· ARCO ALASKA RIG · LOCATION· DRILLSITE #5 PRUDHOE BAy FIELD WELL · LATI'~UDE· 5 - 09 70.2600 N LONGITUDE: 149 W SURVEY DATE' 28 MARCH 1996 SURVEY TYPE ' MULTISHOT IN 3.5" TUBING DEPTH REFERENCE' MAX. SURVEY DEPTH · ROTARY TABLE ELEVATION 64.0 FT. 5200 SURVEY TIED ONTO · SURVEY INTERVAL' UTM CO-ORDINATES ' NA 100' FROM 0-3300' 50' FROM 3300' TO 9900' TARGET DIRECTION ' 107.67 GRID CORRECTION ' N/A CALCULATION METHOD' MINIMUM CURVATURE SURVEYOR · TOM STODDARD SR334.DOC gyro/data 3. OUTRUN SURVEY LISTING SR334.DOC A Gyrodat a D i re c t i ona i Survey for ARCO ALASKA WELL: 5-09, 3.5" TUBING Location: DRILLSITE #5, PRUDHOE BAY FIELD, E.O.A. 'ob Number: AK0396C334 .un Date: 28-Mar-96 17:56: 6 lurveyor: TOM STODDARD lalculation Method: MINIMUM CURVATURE lurvey Latitude: 70.260000 deg. N lub-sea Correction from Vertical Reference: 64 ft. ~zimuth Correction: ~yro: Bearings are Relative to True North ~roposed Well Direction: 107.670 deg Tertical Section Calculated from Well Head Location ~losure Calculated from Well Head Location torizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a Di r e c t i ona I Survey RCO ALASKA PELL: 5-09, 3.5" TUBING ,ocation: DRILLSITE #5, 'ob Number: AK0396C334 PRUDHOE BAY FIELD, E.O.A. [EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -64.0 0.00 0.0 0.0 Page HORIZONTAL C 00 R D I N A.T E S feet 0.00 N 0.00 E 1-9900 FT. GYRO MULTISHOT SURVEY IN 3.5" TUBING ~LL MEASURED DEPTHS REFERENCED TO R.K.B. ELEV. OF 64 FT. 100.0 .13 15.74 100.0 .1 36.0 200.0 .14 117.15 200.0 .2 136.0 300.0 .15 253.97 300.0 .1 236.0 400.0 .10 117.52 400.0 -.0 336.0 500.0 .16 177.80 500.0 -.2 436.0 600.0 .17 260.94 600.0 -.3 536.0 700.0 .17 171.37 700.0 -.5 636.0 800.0 .10 298.76 800.0 -.6 736.0 900.0 . .13 125.84 900.0 -.6 836.0 1000.0 .17 335.41 1000.0 -.6 936.0 1100.0 .09 274.58 1100.0 -.4 1036.0 1200.0 .19 241.39 1200.0 -.5 1136.0 1300.0 .18 207.68 1300.0 -.7 1236.0 1400.0 .15 117.69 1400.0 -.9 1336.0 1500.0 .25 184.44 1500.0 -1.2 1436.0 1600.0 .30 145.35 1600.0 -1.6 1536.0 1700.0 .63 216.22 1700.0 -2.3 1636.0 1800.0 .82 231.66 1800.0 -3.2 1736.0 1900.0 .38 229.84 1900.0 -3.8 1836.0 2000.0 .07 128.10 2000.0 -4.1 1936.0 .13 .21 .27 .23 .14 .22 .24 .24 .23 .29 .15 .13 .11 .23 .23 .19 .60 .27 .44 .40 .1 .2 .2 .1 .3 .4 .5 .6 .7 .6 .5 .7 1.0 1.1 1.3 1.7. 2.4 3.5 4.5 4.8 15.7 45.7 63.8 91.3 136.0 174.2 189.8 192.8 190.3 188.2 206.8 221.0 222.3 213.8 203.4 193.4 193.8 204.4 210.5 211.1 .11 N .03 E .16 N .17 E .07 N .15 E .00 S .10 E .18 S .18 E .35 S .04 E .52 S .09 W .62 S .14 W .65 S .12 W .58 S .08 W .44 S .22 W .52 S .45 W .73 S .67 W .93 S .62 W 1.21 S .52 W 1.64 S .39 W 2.30 S .56 W 3.18 S 1.45 W 3.84 S 2.26 W 4.09 S 2.47 W A Gyrodat'a D i r e c t iona i Survey RCO ALASKA ELL: 5-09, 3.5" TUBING ocation: DRILLSITE #5, ob Number: AK0396C334 PRUDHOE BAY FIELD, E.O.A. Page EASURED DEPTH feet 2100.0 2200.0 2300.0 2400.0 2500.0 I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet .15 304.70 2100.0 .19 40.59 2200.0 .24 46.66 2300.0 .49 115.41 2400.0 .49 113.05 2500.0 VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg., 100 ft. -4.1 2036.0 .21 4. -3.9 2136.0 .25 4 -3.6 2236.0 .05 4 -3.6 2336.0 .46 4 -4.0 2436.0 .02 4 .8 211.9 .6 213.2 .2 212.2 .0 205.5 .1 193.4 HORIZONTAL COORDINATES feet 4.06 S 2.53 W 3.86 S 2.52 W 3.59 S 2.26 W 3.63 S 1.73 W 3.98 S .95 W 2600.0 2700.0 2800.0 2900.0 3000.0 · 56 100.45 2600.0 · 66 96.89 2700.0 · 03 106.76 2800.0 .18 95.31 2899.8 .10 90.88 2999.3 -4.2 2536.0 .13 4 -4.4 2636.0 .10 4 -4.7 2736.0 .40 5 -5.3 2835.8 3.18 8 -5.8 2935.3 2.95 17 .2 181.0 .5 167.4 .3 152.9 .7 127.6 .7 109.0 4.23 S .07 W 4.39 S .98 E 4.72 S 2.42 E 5.32 S 6.91 E 5.75 S 16.73 E 3100.0 3200.0 3300.0 3399.0 3449.0 9.30 101.24 3098.3 11.58 107.17 3196.7 13.66 99.20 3294.2 16.04 98.75 3389.9 17.24 99.24 3437.8 -7.4 3034.3 2.64 3 -12.0 3132.7 2.51 4 -16.8 3230.2 2.71 7 -20.8 3325.9 2.40 9 -23.0 3373.8 2.42 11 1.7 103.5 9.8 103.9 1.6 103.6 6.9 102.4 1.2 101.9 7.42 S 30.84 E 11.96 S 48.36 E 16.81 S 69.61 E 20.76 S 94.67 E 23.00 S 108.81 E 3499.0 3549.0 3599.0 3649.0 3699.0 18.46 99.53 3485.4 19.80 100.13 3532.7 20.96 100.58 3579.5 22.00 100.65 3626.1 22.99 100.90 3672.3 -25.5 3421.4 2.45 12 -28.3 3468.7 2.71 14 -31.4 3515.5 2.33 16 -34.8 3562.1 2.08 17 -38.4 3608.3 1.98 19 6.5 101.6 2.9 101.4 0.3 101.3 8.6 101.2 7.8 101.2 25.50 S 123.93 E 28.30 S 140.08 E 31.43 S 157.21 E 34.81 S 175.20 E 38.39 S 193.99 E 3749.0 3799.0 3849.0 3899.0 3949.0 23.84 101.12 3718.1 24.45 101.11 3763.8 25.03 101.25 3809.2 25.89 101.54 3854.3 26.87 101.88 3899.1 -42.2 3654.1 1.72 21 -46.1 3699.8 1.21 23 -50.2 3745.2 1.16 25 -54.4 3790.3 1.74 28 -58.9 3835.1 2.00 30 7.6' 101.2 8.1 101.2 9.0 101.2 0.5 101.2 2.7 101.2 42.18 S 213.50 E 46.12 S 233.57 E 50.18 S 254.09 E 54.43 S 275.16 E 58.94 S 296.91 E A Gyroda t a D i re c t i ona i Survey RCO ALASKA 'ELL: 5-09, 3.5" TUBING' ,ocation: DRILLSITE #5, Ob Number: AK0396C334 PRUDHOE BAY FIELD, E.O.A. Page 3 iEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg. / feet deg. 100 ft. HORIZONTAL COORDINATES. feet 3999.0 27.92 102.11 3943.5 4049.0 29.02 102.31 3987.5 4099.0 30.05 102.57 4031.0 4149.0 30.87 102.91 4074.1 4199.0 31.67 103.38 4116.8 -63.7 3879.5 -68.8 3923.5 -74.1 3967.0 -79.7 4010.1 -85.6 4052.8 2.10 325.7 101.3 2.22 349.5 101.3 2.07 374.2 101.4 1.68 399.5 101.5 1.68 425.5 101.6 63.72 S 319.41 E 68.76 S 342.71 E 74.07 S 366.78 E 79.66 S 391.50 E 85.57 S 416.77 E 4249.0 32.43 103.78 4159.2 4299.0 32.99 103.91 4201.2 4349.0 34.27 104.29 4242.9 4399.0 35.53 104.26 4283.9 4449.0 36.90 104.29 4324.2 -91.8 4095.2 -98.3 4137.2 -105.0 4178.9 -112.1 4219.9 -119.3 4260.2 1.58 452.0 101.7 1.13 479.0 101.8 2.58 506.7 102.0 2.53 535.2 102.1 2.73 564.8 102.2 91.80 S 442.57 E 98..27 S 468.80 E 105.01 S 495.66 E 112.06 S 523.38 E 119.35 S 552.01 E 4499.0 37.41 104.19 4364.1 4549.0 37.75 104.41 4403.7 4599.0 37.99 104.48 4443.2 4649.0 3q.60 104.60 4482.7 4699.0 37.63 104.56 4522.3 -126.8 4300.1 -134.3 4339.7 -142.0 4379.2 -149.7 4418.7 -157.3 4458.3 1.03 594.9 102.3 .72 625.4 102.4 .48 656.1 102.5 .79 686.7 102.6 .08 717.2 102.7 126.78 S 581.28 E 134.31 S 610.83 E 141.97 S 640.55 E 149.66 S 670.21 E · 57.34 S 699.74 E 4749.0 37.45 104.58 4561.9 4799.0 37.39 104.77 4601.6 4849.0 37.40 104.85 4641.4 4899.0 36.86 104.87 4681.2 4949.0 37.17 104.94 4721.2 -165.0 4497.9 -172.7 4537.6 -180.5 4577.4 -188.2 4617.2 -195.9 4657.2 .36 747.7 102.7 .26 778.0 102.8 .11 808.4 102.9 1.07 838.5 103.0 .62 868.6 103.0 165.00 S 729.22 E 172.70 S 758.61 E 180.46 S 787.97 E 188.20 S 817.14 E 195.94 S 846.23 E 4999.0 37.01 105.01 4761.0 5049.0 36.28 105.32 4801.2 5099.0 36.61 105.45 4841.4 5149.0 36.92 105.88 4881.4 5199.0 36.94 106.20 4921.4 -203.7 4697.0 -211.5 4737.2 -219.4 4777.4 -227.5 4817.4 -235.8 4857.4 .34 898.8 103.1 1.49 928.6 103.2 .67 958.3 103.2 .81 988.2 103.3 .39 1018.2 103.4 203.73 S 875.36 E 211.54 S 904.16 E 219.42 S 932.80 E 227.50 S 961.62 E 235.81 S 990.49 E A Gyrodat a D i re c t iona I Survey ~RCO ALASKA ;ELL: 5-09, 3.5" TUBING · ocation: DRILLSITE #5, [ob Number: AK0396C334 PRUDHOE BAY FIELD, E.O.A. Page ~EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA SECTION DEPTH feet feet DOGLEG CLOSURE SEVERITY DIST. AZIMUTH deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 5249.0 5299.0 5349.0 5399.0 5449.0 36.96 106.36 4961.4 37.00 106.44 5001.3 36.60 106.68 5041.3 36.50 106.92 5081.5 36.38 107.10 5121.7 -244.2 4897.4 -252.7 4937.3 -261.3 4977.3 -269.9 5017.5 -278.6 5057.7 .20 1048.2 103.5 · 12 1078.2 103.6 .86 1108.1 103.6 · 34 1137.9 103.7 .32 1167.5 103.8 244.23 S 1019.34 E 252.73 S 1048.19 E 261.26 S 1076.90 E 269.87 S 1105.40 E 278.56 S 1133.80 E 5499.0 5549.0 5599.0 5649.0 5699.0 36.35 107.18 5162.0 36.44 107.42 5202.2 36.38 107.63 5242.5 36.12 107.85 5282.8 36.32 108.06 5323.1 -287.3 5098.0 -296.1 5138.2 -305.1 5178.5 -314.1 5218.8 -323.2 5259.1 .12 1197.1 103.9 .33 1226.7 104.0 .27 1256.3 104.1 .58 1285.9 104.1 .47 1315.3 104.2 287.29 S 296.12 S 305.05 S 314.06 S 323.17 S 1162.13 E 1190.45 E 1218.75 E 1246.91 E 1275.02 E 5749.0 5799.0 5849.0 5899.0 5949.0 35.81 108.48 5363.6 35.64 108.53 5404.2 35.14 108.68 5444.9 3-5.43 108.59 5485.7 35.60 108.68 5526.4 -332.4 5299.6 -341.7 5340.2 -350.9 5380.9 -360.1 5421.7 -369.4 5462.4 1.13 1344.7 104.3 .35 1373.8 104.4 1.00 1402.7 104.5 .58 1431.5 104.6 · 37 1460.5 104.7 332.40 S 341.66 S 350.90 S 360.13 S 369.41 S 1302.97 E 1330.65 E 1358.10 E 1385.46 E 1412.99 E 5999.0 6049.0 6099.0 6149.0 6199.0 36.01 108.77 5567.0 36.66 108.69 5607.3 37.27 108.74 5647.2 37.84 108.93 5686.8 37.71 109.03 5726.4 -378.8 5503.0 -388.3 5543.3 -398.0 5583.2 -407.8 5622.8 -417.8 5662.4 .81 1489.7 104.7 1.32 1519.2 104.8 1.21 1549.2 104.9 1.15 1579.6 105.0 .28 1610.2 105.0 378.80 S 388.31 S 397.96 S 407.80 S 417.76 S 1440.69 E 1468.75 E 1497.22 E 1526.07 E 1555.03 E 6249.0 6299.0 6349.0 6399.0 6449.0 37.89 109.06 5765.9 37.99 109.11 5805.3 38.12 109.38 5844.7 38.83 109.40 5883.8 38.85 109.37 5922.8 -427.8 5701.9 -437.8 5741.3 -448.0 5780.7 -458.3 5819.8 -468.7 5858.8 .35 1640.7 105.1 .21 1671.4 105.2 .42 1702.2 105.3 1.41 1733.2 105.3 .05 1764.5 105.4 427.76 S 437.82 S 447.98 S 458.30 S 468.71 S 1584.00 E 1613.05 E 1642.15 E 1671.49 E 1701.07 E A Gyrodat a D i re c t iona I Survey ~CO ALASKA TELL: 5-09, 3.5" TUBING ~ocation: DRILLSITE #5, rob Number: AK0396C334 PRUDHOE BAY FIELD, E .O.A. Page IEASURED DEPTH. feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL C 00 R D I N A T E~S feet 6500.0 6500.0 6550.0 6600.0 6650.0 38.77 109.34 5962.5 38.78 109.33 5962.5 39.01 109.38 6001.4 39.00 109.35 6040.3 38.68 109.29 6079.2 -479.3 5898.5 .15 1796.4 105.5 -479.3 5898.5 .00 1796.4 105.5 -489.7 5937.4 .46 1827.7 105.5 -500.1 5976.3 .05 1859.1' 105.6 -510.5 6015.2 .64 1890.4 105.7 479.30 S 1731.23 E 479.30 S 1731.23 E 489.71 S 1760.85 E 500.14 S 1790.53 E 510.52 S 1820.12 E 6700.0 6750.0 6800.0 6850.0 6900.0 38.80 109.31 6118.2 38.27 109.12 6157.3 38.09 109.13 6196.6 38.07 109.06 6236.0 37.69 108.96 6275.5 -520.9 6054.2 .25 1921.6 105.7 -531.1 6093.3 1..07 1952.7 105.8 -541.2 6132.6 .37 1983.5 105.8 -551.3 6172.0 .10 2014.3 105.9 -561.3 6211.5 .76 2045.0 105.9 520.86 S 531.11 S 541.24 S 551.33 S 561.33 S 1849.65 E 1879.07 E 1908.27 E 1937.41 E 1966.43 E 6950.0 7000.0 7050.0 7100.0 7150.0 37.69 109.07 6315.0 37.31 108.95 6354.7 37.43 109.02 6394.4 3.7.40 108.96 6434.1 37.06 109.00 6474.0 -571.3 6251.0 .13 2075.5 106.0 -581.2 6290.7 .78 2105.9 106.0 -591.1 6330.4 .24 2136.2 106.1 -601.0 6370.1 .08 2166.6 106.1 -610.8 6410.0 .68 2196.8 106.1 571.29 S 581.20 S 591.08 S 600.96 S 610.80 S 1995.34 E 2024.12 E 2052.81 E 2081.54 E 2110.15 E 7200.0 7250.0 7300.0 7350.0 7400.0 36.86 108.98 6513.9 36.85 109.07 6553.9 36.50 108.92 6594.0 36.48 108.79 6634.2 36.28 108.81 6674.5 -620.6 6449.9 .41 2226.8 106.2 -630.4 6489.9 .10 2256.8 106.2 -640.1 6530.0 .73 2286.6 106.3 -649.7 6570.2 .16 2316.3 106.3 -659.2 6610.5 .41 2345.9 106.3 620 · 59 S 630.36 S 640.08 S 649.69 S 659.25 S 2138.58 E 2166.93 E 2195.17 E 2223.31 E 2251.38 E 7450.0 7500.0 7550.0 7600.0 7650.0 35.84 108.68 6714.9 35.85 108.71 6755.4 35.40 108.70 6796.1 35.11 108.66 6836.9 34.87 108.66 6877.9 -668.7 6650.9 .88 2375.3 106.4 -678.1 6691.4 .04 2404.6 106.4 -687.4 6732.1 .90 2433.7 106.4 -696.7 6772.9 .57 2462.5 106.4 -705.8 6813.9 .48 2491.2 106.5 668.71 S 678.09 S 687.43 S 696.67 S 705.85 S 2279.25 E 2306.98 E 2334.57 E 2361.91 E 2389.07 E A Gyrodat a D i re ct ional Survey RCO ALASKA tELL: 5-09, 3.5" TUBING ,ocation: DRILLSITE #5, 'ob Number: AK0396C334 PRUDHOE BAY FIELD, E.O.A. Page [EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 770 775 780 785 790 0.0 34.56 108.55 6919.0 0.0 34.46 108.57 6960.2 0.0 34.10 108.56 7001.5 0.0 33.99 108.71 7042.9 0.0 33.90 108.84 7084.4 -714.9 6855.0 .63 2519.6 106.5 -723.9 6896.2 .21 2547.9 106.5 -732.9 6937.5 .71 2576.1 106.5 -741.9 6978.9 .27 2604.0 106.6 -750.8 7020.4 .23 2631.9 106.6 714.93 S 2416.06 E 723.95 S 2442.91 E 732.91 S 2469.61 E 741.86 S 2496.13 E 750.84 S 2522.57 E 795 80O 8O5 810 815 0.0 33.80 109.00 7125.9 0.0 33.79 109.11 7167.5 0.0 33.71 109.22 7209.0 0.0 33.35 109.20 7250.7 0.0 33.53 109.54 7292.4 -759.9 7061.9 .27 2659.8 106.6 -769.0 7103.5 .12 2687.6 106.6 -778.1 7145.0 .20 2715.3 106.7 -787.2 7186.7 .73 2742.9 106.7 -796.3 7228.4 .52 2770.4 106.7 759.88 S 2548.92 E 768.95 S 2575.21 E 778.07 S 2601.45 E 787.16 S 2627.53 E 796.30 S 2653.52 E 820 825 830 835 840 0.0 33.42 109.56 7334.1 0.0 33.55 109.72 7375.8 0.0 33.13 109.96 7417.6 0.0 3~.94 110.07 7459.5 0.0 33.05 110.13 7501.5 -805.5 7270.1 .23 2798.0 106.7 -814.8 7311.8 .31 2825.5 106.8 -824.1 7353.6 .88 2853.0 106.8 -833.5 7395.5 .40 2880.2 106.8 -842.8 7437.5 .22 2907.4 106.9 805.53 S 2679.51 E 814.80 S 2705.49 E 824.13 S 2731.34 E 833.45 S 2756.95 E 842.81 S 2782.52 E 845 85O 855 86O 865 0.0 32.92 110.33 7543.4 0.0 32.76 110.50 7585.4 0.0 32.70 110.72 7627.5 0.0 32.44 110.99 7669.6 0.0 32.10 111.22 7711.9 -852.2 7479.4 .34 2934.5 106.9 -861.7 7521.4 .36 2961.6 106.9 -871.2 7563.5 .27 2988.6 106.9 -880.8 7605.6 .60 3015.4 107.0 -890.4 7647.9 .72 3042.1 107.0 852.22 S 2808.06 E 861.68 S 2833.47 E 871.20 S 2858.78 E 880.78 S 2883.93 E 890.39 S 2908.84 E 870 875 880 885 89O 0.0 32.07 111.57 7754.3 0.0 31.38 111.87 7796.8 0.0 31.16 112.25 7839.5 0.0 31.29 112.93 7882.3 0.0 31.07 113.66 7925.1 -900.1 7690.3 .38 3068.5 107.1 -909.8 7732.8 1.43 3094.7 107.1 -919.6 7775.5 .59 3120.6 107.1 -929.5 7818.3 .75 3146.4 107.2 -939.8 7861.1 .88 3172.1 107.2 900.08 S 909.81 S 919.55 S 929.51 S 939.75 S 2933.57 E 2957.99 E 2982.04 E 3005.97 E 3029.75 E A Gyroda t a D i re c t iona i Survey RCO ALASKA ~ELL: 5-09, 3.5" TUBING ,ocation: DRILLSITE #5, 'ob Number: AK0396C334 PRUDHOE BAY FIELD, E .O.A. Page [EASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SUBSEA DOGLEG CLOSURE SECTION DEPTH SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 8950.0 30.83 114.68 7967.9 9000.0 30.85 115.81 8010.9 9050.0 30.58 116.86 8053.9 9100.0 30.43 117.94 8096.9 9150.0 30.99 119.43 8139.9 -950.3 7903.9 1.15 3197.7 107.3 -961.2 7946.9 1.16 3223.1 107.4 -972.5 7989.9 1.19 3248.3 107.4 -984.2 8032.9 1.15 3273.3 107.5 -996.5 8075.9 1.89 3298.3 107.6 950.28 S 3053.20 E 961.21 S 3076.38 E 972.54 S 3099.27 E 984.22 S 3121.80 E 996.47 S 3144.20 E 9200.0 30.74 120.52 8182.8 9250.0 30.87 122.16 8225.8 9300.0 30.82 123.48 8268.7 9350.0 30.64 124.62 8311.7 9400.0 31.21 126.54 8354.6 -1009.3 8118.8 1.23 3323.4 107.7 -1022.6 8161.8 1.70 3348.3 107.8 -1036.5 8204.7 1.36 3373.0 107.9 -1050.8 8247.7 1.22 3397.6 108.0 -1065.7 8290.6 2.28 3422.1 108.1 1009.29 S 1022.60 S 1036.50 S 1050.80 S 1065.75 S 3166.42 E 3188.29 E 3209.83 E 3231.00 E 3251.89 E 9450.0 31.08 128.50 8397.4 9500.0 31.55 129.66 8440.1 9550.0 31.60 130.41 8482.7~ 9600.0 32.15 130.48 8525.2 9650.0 32.29 130.32 8567.5 -1081.5 8333.4 2.05 3446.5 108.3 -1097.9 8376.1 1.53 3470.8 108.4 -1114.7 8418.7 .79 3495.1 108.6 -1131.8 8461.2 1.10 3519.7 108.8 -1149.1 8503.5 .33 3544.4 108.9 1081.50 S 1097.88 S 1114.72 S 1131.84 S 1149.12 S 3272.40 E 3292.57 E · 3312.61 E 3332.70 E 3353.00 E 9700.0 32.20 130.60 8609.8 9750.0 32.61 130.21 8652.0 9800.0 32.17 130.29 8694.2 9850.0 32.47 130.36 8736.4 9900.0 32.09 130.23 8778.7 -1166.4 8545.8 .35 3569.3 109.1 -1183.8 8588.0 .92 3594.2 109.2 -1201.1 8630.2 .88 3619.3 109.4 -1218.4 8672.4 .60 3644.2 109.5 -1235.7 8714.7 .77 3669.2 109.7 1166.43 S 1183.80 S 1201.10 S 1218.40 S 1235.68 S 3373.30 E 3393.70 E 3414.14 E 3434.52 E 3454.89 E ?inal Station Closure: Distance: 3669.22 ft Az: 109.68 deg. A Gyrodat a D i re c t i ona I Survey for ARCO ALASKA WELL: 5-09, 3.5" TUBING Location: DRILLSITE ~5, PRUDHOE BAY FIELD, E.O.A. 'ob Number: AK0396C334SS ~.un Date: 28-Mar-96 17:56: 6 :urveyor: TOM STODDARD ~alculation Method: MINIMUM CURVATURE ~urvey Latitude: 70.260000 deg. N lub-sea Correction from Vertical Reference: 64 ft. ~zimuth Correction: ~yro: Bearings are Relative to True North ~roposed Well Direction: 107.670 deg Tertical Section Calculated from Well Head Location 21osure Calculated from Well Head Location {orizontal Coordinates Calculated from Local Horizontal Reference A Gyroda t a D i re c t i ona I Survey RCO ALASKA ELL: 5-09, 3.5" TUBING ocation: DRILLSITE #5, ob Number: AK0396C334SS PRUDHOE BAY FIELD, E .O.A. SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH feet deg. deg. feet feet deg./ feet deg. 100 ft. -64.0 0.00 0.00 0.0 0.0 0.00 0.0 0.0 -9900 FT. GYRO MULTISHOT SURVEY IN 3.5" TUBING ~LL MEASURED DEPTHS REFERENCED TO R.K.B. ELEV. OF 64 FT. Page HORIZONTAL .C 00 R D I N A T E S feet 0.00 N 0.00 E 100.0 .14 80.64 164.0 .1 .18 .2 34.9 200.0 .15 204.72 264.0 .1 .25 .2 57.3 300.0 .12 166.64 364.0 .0 .25 .1 81.4 400.0 .14 156.10 464.0 -.1 .17 .3 119.9 500.0 .17 231.01 564.0 -.3 .19 .4 160.4 600.0 .17 203.61 664.0 -.5 .23 .5 184.2 700.0 .12 252.90 764.0 -.6 .24 .6 191.7 800.0 .12 188.09 864.0 -.6 .23 .7 191.2 900.0 .16 259.97 964.0 -.6 .27 .6 189.0 1000.0 .12 296.48 1064.0 -.5 .20 .5 200.1 1100.0 .16 253.34 1164.0 -.5 .13 .7 215.9 1200.0 .18 219.82 1264.0 -.7 .11 1.0 221.9 1300.0 .16 150.08 1364.0 -.9 .19 1.1 216.8 1400.0 .21 160.41 1464.0 -1.1 .23 1.3 207.1 1500.0 .28 159.42 1564.0 -1.5 .21 1.7 197.0 1600.0 .51 190.71 1664.0 -2.1 .45 2.4 193.6 1700.0 .75 226.11 1764.0 -2.9 .39 3.5 200.6 1800.0 .54 230.50 1864.0 -3.6 .38 4.5 208.3 1900.0 .18 164.70 1964.0 -4.0 .41 4.8 210.9 2000.0 .12 241.16 2064.0 -4.1 .28 4.8 211.6 .15 N .12 E .11 N .16 E .03 S .12 E .12 S .15 E .29 S .09 E .46 S .07 W .58 S .12 W .64 S .13 W .61 S .10 W .49 S .17 W .49 S .37 W .66 S .59 W .86 S .64 W 1.11 S .56 W 1.49 S .44 W 2.06 S .50 W 2.87 S 1.13 W 3.60 S 1.97 W 4.00 S 2.40 W 4.07 S 2.51 W A Gyro da t a Di re c t i ona i Survey ~CO ALASKA ~ELL: 5-09, 3.5" TUBING Jocation: DRILLSITE #5, rob Number: AK0396C334SS PRUDHOE BAY FIELD, E.O.A. Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. H O R I Z O N T A L COORDINATES. feet 2100.0 .18 135.61 2200.0 .22 44.47 2300.0 .40 90.68 2400.0 .49 113.90 2500.0 .54 104.98 2164.0 -3.9 .24 4.6 212.7 2264.0 -3.7 .12 4.2 212.6 2364.0 -3.6 .31 4.0 207.9 2464.0 -3.9 .18 4.1 197.8 2564.0 -4.1 .09 4.2 185.5 3.93 S 2.52 W 3.69 S 2.36 W 3.61 S 1.92 W 3.85 S 1.23 W 4.14 S .39 W 2600.0 .62 98.17 2700.0 .90 103.21 2800.0 3.05 99.42 2900.0 6.07 92.46 3000.0 8.54 97.65 2664.0 -4.3 .12 4.5 172.3 2764.0 -4.6 .29 5.3 158.1 2864.0 -5.1 2.18 8.7 136.7 2964.0 -5.6 3.03 17.7 115.6 3064.0 -6.8 2.75 31.7 105.4 4.34 S .65 E 4.60 S 1.90 E 5.11 S 5.30 E 5.60 S 13.24 E 6.85 S 25.95 E 3100.0 10.82 105.20 3200.0 13.02 101.67 3300.0 15.39 98.87 3400.0 -17.91 99.40 3500.0 20.58 100.43 3164.0 -10.5 2.55 49.8 103.8 3264.0 -15.3 2.65 71.6 103.7 3364.0 -19.7 2.48 96.9 102.7 3464.0 -24.4 2.44 126.5 101.8 3564.0 -30.4 2.46 160.3 101.3 10.46 S 42.54 E 15.31 S 63.02 E 19.69 S 87.88 'E 24.38 S 117.12 E 30.40 S 151.53 E 3600.0 22.81 100.86 3700.0 24.45 101.11 3800.0 26.10 101.61 3900.0 28.43 102.20 4000.0 30.68 102.83 3664.0 -37.7 2.00 197.8 101.2 3764.0 -46.1 1.21 259.0 101.2 3864.0 -55.4 1.79 302.7 101.2 3964.0 -66.1 2.16 349.5 101.3 4064.0 -78.4 1.77 399.5 101.5 37.75 S 190.63 E 46.15 S 233.67 E 55.40 S 279.86 E 66.07 S 330.28 E 78.36 S 385.73 E 4100.0 32.50 103.80 4200.0 34.92 104.27 4300.0 37.41 104.19 4400.0 37.78 104.54 4500.0 37.44 104.59 4164.0 -92.5 1.53 479.0 101.7 4264.0 -108.6 2.55 535.2 102.0 4364.0 -126.8 1.03 594.9 102.3 4464.0 -146.0 .65 686.7 102.5 4564.0 -165.4 .35 778.0 102.8 92.54 S 445.58 E 108.65 S 509.94 E 126.76 S 581.23 E 14'6.02 S 656.19 E 165.40 S 730.75 E A Gyroda t a D i re c t i ona i Survey ~RCO ALASKA JELL: 5-09, 3.5" TUBING ~ocation: DRILLSITE #5, rob Number: AK0396C334SS PRUDHOE BAY FIELD, E.O.A. Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION. SEVERITY DIST, AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL C O O.R D I N A T E S feet 4600.0 37.10 104.86 4700.0 36.95 105.04 4800.0 36.78 105.70 4900.0 36.96 106.37 5000.0 36.54 106.82 4664.0 -184.9 .66 838.5 102.9 4764.0 -204.3 .43 928.6 103.1 4864.0 -224.0 .75 988.2 103.3 4964.0 -244.8 .19 1078.2 103.5 5064.0 -266.1 .57 1137.9 103.7 184.85 S 804.53 E 204.31 S 877.49 E 223.98 S 949.07 E 244.79 S 1021.24 E 266.12 S 1092.97 E 5100.0 36.35 107.20 5200.0 36.24 107.75 5300.0 35.81 108.48 5400.0 35.28 108.64 5500.0 35.98 108.76 5164.0 -287.7 .13 1226.7 103.9 5264.0 -309.9 .44 1285.9 104.1 5364.0 -332.5 1.13 1373.8 104.3 5464.0 -355.2 .80 1431.5 104.5 5564.0 -378.1 .78 1489.7 104.7 287.73 S 1163.54 E 309.86 S 1233.77 E 332.50 S 1303.26 E 355.21 S 1370.89 E 378.11 S 1438.65 E 5600.0 37.51 108.82 5700.0 37.88 109.06 5800.0 38.47 109.39 5900.0 38.79 109.33 6000.0 38.80 109.32 5664.0 -402.1 1.19 1579.6 104.9 5764.0 -427.3 .34 1640.7 105.1 5864.0 -453.1 .91 1733.2 105.3 5964.0 -479.7 .02 1827.7 105.5 6064.0 -506.5 .41 1890.4 105.6 402.13 S 1509.44 E 427.29 S 1582.62 E 453.07 S 1656.63 E 479.70 S 1732.36 E 506.46 S 1808.55 E 6100.0 38.24 109.13 6200.0 37.80 108.99 6300.0 37.34 108.97 6400.0 37.15 108.99 6500.0 36.76 109.03 6164.0 -532.8 .95 1983.5 105.8 6264.0 -558.4 .57 2045.0 105.9 6364.0 -583.5 .65 2136.2 106.0 6464.0 -608.3 .53 2196.8 106.1 6564.0 -632.8 .26 2286.6 106.2 532.83 S 1884.01 E 558.42 S 1958.00 E 583.51 S 2030.84 E 608.34 S 2102.99 E 632.81 S 2174.03 E 6600.0 36.33 108.81 6700.0 35.75 108.71 6800.0 34.95 108.66 6900.0 34.42 108.57 7000.0 33.95 108.77 6664.0 -656.8 .34 2345.9 106.3 6764.0 -680.1 .22 2433.7 106.4 6864.0 -702.7 .51 2491.2 106.5 6964.0 -724.8 .26 2576.1 106.5 7064.0 -746.4 .25 2631.9 106.6 656.76 S 2244.08 E 680.06 S 2312.81 E 702.74 S 2379.88 E 724.78 S 2445.39 E 746.43 S 2509.58 E A Gyrodat a D i re c t iona I Survey ~CO ALASKA ;ELL: 5-09, 3.5" TUBING Jocation: DRILLSITE #5, rob Number: AK0396C334SS PRUDHOE BAY FIELD, E.O.A. Page SUBSEA I N C L AZIMUTH DEPTH feet deg. deg. VERTICAL VERTICAL DOGLEG CLOSURE DEPTH SECTION SEVERITY DIST. AZIMUTH feet feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 7100.0 33.79 109.10 7200.0 33.41 109.31 7300.0 33.51 109.67 7400.0 32.95 110.07 7500.0 32.84 110.42 7164.0 -768.2 .14 2687.6 106.6 7264.0 -790.1 .66 2770.4 106.7 7364.0 -812.2 .29 2825.5 106.8 7464.0 -834.5 .38 2907.4 106.8 7564.0 -856.9 .35 2961.6 106.9 768.20 S 790.07 S 812.17 S 834.45 S 856.86 S 2573.02 E 2635.81 E 2698.12 E 2759.68 E 2820.52 E 7600.0 32.47 110.95 7700.0 31.91 111.64 7800.0 31.23 112.64 7900.0 30.85 114.59 8000.0 30.54 117.11 7664.0 -879.5 .55 3015.4 107.0 7764.0 -902.3 .62 3094.7 107.1 7864.0 -925.3 .68 3146.4 107.2 7964.0 -949.3 1.13 3197.7 107.3 8064.0 -975.3 1.18 3273.3 107.4 879.50 S 902.31 S 925.26 S 949.31 S 975.29 S 2880.58 E 2939.17 E 2995.75 E 3051.05 E 3104.58 E 8100.0 30.85 120.04 8200.0 30.83 123.33 8300.0 31.18 126.97 8400.0 31.57 130.08 8500.0 32.28 130.33 8164.0 -1003.7 1.52 3323.4 107.6 8264.0 -1035.0 1.40 3373.0 107.9 8364.0 -1069.2 2.23 3446.5 108.2 8464.0 -1107.3 1.12 3495.1 108.5 8564.0 -1147.7 .39 3544.4 108.9 1003.66 S 1034.97 S 1069.21 S 1107.32 S 1147.70 S 3156.67 E 3207.47 E 3256.40 E 3303.81 E 3351.34 E 8600.0 32.48 130.24 8700.0 32.22 130.28 8714.7 32.09 130.23 8664.0 -1188.7 .90 3619.3 109.3 8764.0 -1229.7 .71 3669.2 109.6 8778.7 -1235.7 .77 3669.2 109.7 1188.73 S 1229.66 S 1235.68 S 3399.53 E 3447.80 E 3454.89 E ?inal Station Closure: Distance: 3669.22 ft Az: 109.68 deg. gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK0396C334 TOOL NUMBER: 080 MAXIMUM GYRO TEMPERATURE: 85.46 MAXIMUM AMBIENT TEMPERATURE: 74.6 MAXIMUM INCLINATION: 38.85 AVERAGE AZIMUTH: 109.68 WIRELINE REZERO VALUE: 0.0 REZERO ERROR / K: CALIBRATION USED FOR FIELD SURVEY: 1408 CALIBRATION USED FOR FINAL SURVEY: 1408 PRE JOB MASS BALANCE OFFSET CHECK: -.46 POST JOB MASS BALANCE OFFSET CHECK1 ' CONDITION OF SHOCK WATCHES -.48 USED .33 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 9900 32.09 130.23 8778.7 1235.5 S 3454.9 E FINAL SURVEY 9900 32.09 130.23 8778.7 1235.68 S 3454.89E SR334.DOC gyro/data SR334.DOC gyro/data' FUNCTION TEST JOB NUMBER: AK0396C334 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 9900 32.09 32.09 32.09 32.09 32.09 AZIMUTH M.D. ft 1 2 3 4 5 9900 130.23 130.23 130.23 130.23 130.23 SR334.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR334.DOC gyro/data EQUIPMENT REPORT JOB NUMBER' AK0396C334 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL.'. No. 080 GYRO SECTION A0076 DATA SECTION C0031 POWER SECTION C0046 COMPUTER POWER SUPPLY PRINTER INTERFACE A0222 A0085 A0079 A0074 BACKUP TOOL No. 746 GYRO SECTION A0119 DATA SECTION C0063 POWER SECTION C0059 COMPUTER POWER SUPPLY PRINTER INTERFACE A0246 A0107 A0029 A0071 WIRELINE COMPANY · ATLAS WIRELINE CABLE SIZE · 5/16" RUNNING GEAR 2 1/2" SYSTEM TOTAL LENGTH OF TOOL · 32.0 feet MAXIMUM O.D.' 3.6 INCHES TOTAL WEIGHT OF TOOL · 270Lbs SR334.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER: AK0396C334 03//2796 11:20 FLY TO SLOPE 13:30 ' ARRIVED AT ATLAS 17:00 03/28/96 01:30, 02:30 05:30 08:30 09:15 10:45 13:00 16:00 CHECK TOOLS O.K. RU ATLAS START INRUN SURVEY LD TOOL. RD ATLAS. RIH GYROCOMPASS OUT LD TOOL. RD ATLAS. PROCESS SURVEY. RTN TO ATLAS. CK TOOL. CONFIRMED RESULTS. SR334.DOC A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TIONA L SURVEY Atlantic Richfield COMPANY D. S. 5-9 WELL NAME Prudhoe LOCATION JOB NUMBER A?77 S042 TYPE OF SURVEY Multi-shot DATE 7-29-77 SURVEY BY Kevin Dur!ing OFFICE Alaska COHPLETION REPORT JULY 27~ 19 77 ATLANTIC RICHFIELD COMPANY DRILL SITE ~',.IAGNETIC MULTI SHOT SURVEY DECLINATION 31 DEGREES EAST RADIUS OF CURVATURE METHOD OF COr~IPUTATiON K ~ ELEV, 64 FT, CO~,IPLITED FOR EASTMAN WHIPSTOCK INC, BY F. Ft. LINDSEY AND ASSOCIATES RE(;:(] RD OF SURVEY ALL CALCULATIONS PERFORMED BY I B ~ ELECTRONIC COHPUTER MEAS. DEPTH TRUE DOG LEG ANGLE DEPTH SEA DIREC D I S'FAP4CE ANGLE DEG/iOOFT ~' I'-~':, ,~-E D 1,1 . DEG, D M $ 0 30 0.00 - 6 a, 00 N 62, O r,) E -(,,.~ 0-~00 $ 0, D_.O .~..W.. "~ 0,00 S 0 0 0 W 0, O 00 0, O 0 1325 0 30 1324.94 1260.94 N62,00E -~51i'~2 N .............. 10.20 E 11,,56 ['4 62 0 2982 V 0 2980.95 2916.95 N86.OOE ~-Z';O3 r,~ 55.50 E 56.59 N 78 45-- 0 g 0.000 8.20 33 E 0.102 24 E 2,422 41,49 34 ~ 2"927 49,95 34 E 2,473 62.b2 32~-0---~3 15 3254.41 3190.41 S83,00E 2.64 ~..', 103.85 E 103,89 I',; 8t~ 32 19 E 2.223 98.66 2,689 121,57 2,419 148.08 2.423 178,06 1.888 211 . 14~ 2.181 246.71 4024.16 4039.,o ,.,7.,.00,. .,i.il S 458 8~ E 67 $ 83 46 ~2 E 1.~78 4~3.67 4283 33 !5 4181.88 al17.a8 S78.25E 6i-'~0 $ 518,05 E 521.63 S ~3 f~ 1 E 1,366 ~13,58 --~-5' 130 4259,46 4195,a6 279,00E 72,a7 S 570.08 E 574.54 S 82 51 14 E 2,409 5~5,&2 4~0~'8 0 4333,97 4269,97 S79'-~-~ ....... n~]-08 S 624,69 i 630.06 S 82 ~0 50 E 2,688 621,77 ~~'8. 0 4407.26 4343.26 S79,00E 93.01 S 680,90 E 587.22 S 82 13 16 E 0,000 67.~ 465'~37 ~l ~5 a4R1,46 4417.46 S78.75E 104,14 S 737.52 E 744.84 S 81 57 44 E 0,284 7.~_~m~ 4190. 32 0 4103.56 ---&-7'5~ 37 30 4555.1t a49i,li 579.00E i15,i0 S 793,23 E 501,54 S 8i a4 37 E 0,287 792~B ----zF87~ 30 4628.10 4564,10 S78,75E 125,91 S 648.19 E 857.48 S 81 ~3 22 E 0,16~ 84~,39 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER TRUE MEAS. DRIFT VERTICAL SU?5 DRIFT TOTAL COORDINATES DEP TI.~ ANGLE DEPTH SEA DIRGE D M DEG, E L ,Q__$ U g_~__5. ........... &KY_KLKI_IY ............... ID I ,5 T A I',1C E A iN G.L_E. ......... D.~.~/_i_O 0 F T O M '---Z~934 37 30 4.701,09 4637,09 S78,00E 137,19 S--903,04. E 5027 37 0 4775.12 4711.12 $78.00E 148.89 "5-F~"-~-~'W--6---g's"g-8-7~--'~7-~iT;-5-/-J--S-:f'Y'"76"'6-~L' ........ 1 e o. 8 8 5212 37 0 4922.87 4858.87 576.50E 173.71 S 5304 36 ~5 4996.46 4932,46 S76.00E' 186,83 S 5~98 ~6 30 5071.90 5007,90 S76,00~ 20'0,~9 S 5491 37 0 51z~6,42 5082,42 S77,00E 213,38 .... ~. 5584 5677 5768 5861 5953 36 15 .5295 , 57 5231 , 57 S 75 , 005__241 , 20 S ! 336 · 36 E 1357 · ?..5 ..... 5_ _7_ 9__& . 6 ........ 6__F..___._.~L,_.53_~ 13.A9_,.0 ~... 35 45 5369__.._~.9 .....530_5_._,..17_ $..!.5..,9.(!__-E_ ....... 2_5_..5..._0_5. ..... S .......... 1.~8~_.._..0_2...._F_.. ....... 1_.4_1.!_,2._6 .S__'~'..9 .... 35 ...... 1 ? g ........ O_,.~_E_9 ................... 35 0 5445 02 5381,02 574.25E 269,32 S 1439,94 E 1464.91 $ 79 24 21 E 0.8,49 35 15 5520.27 5456,27__S75,00E 283,35 S 1490,9~ ~j__15i7.66 S 79 14 2i E .... 0,-B.8__4 . . 6047 37 0 559 6140 37 45 567 6233 38 0 574 3.51 5679.51 S7a,OOE 328,76 S 1653.72 E- 1686.08 S 78 45 22 E 0,269 i~7b_,_.19__ 6326 38 15 581 6419 39 0 588 6513 39 0 596 6.67 5752.57 S7a. OOE 344,58 S 1708.9i ~g 1743.31 $ 78 35 58 E 0.269 1735~q S 7~ 27 D E__0.80~__1793._~.~_4_ S 78 18 36 E 0.000 18~2.79 6607 39 0 603 6700 38 30 610 6793 38 15 618 5,43 5971.43 S7z+,50E 7. ~,~ ,~0-i~-',--% ......... S'7-4-.o0~ 0.86 6116,86 STa.75'Z 392.95 S i-q78.52 E 1919.18 S 78 ll 5 i£ C'.'J35 191 )qz, 408_,_'_f.'.~ b i~4 34. F 1977.25 S 78 4 ~ ~ ~' :677 L¥7 ,'14 ................... f ?: ' ..... - 2.~_ .... .. ................ ~ ~24.30 5 1990.14 E 2034.87 S 77 57 ~2 E 0,410 2027.86 6886 37 45 6254,15 6190.15 S74,25E 439,60 S 2045.32 E 2092,0~ $ 77 52 11 E 0.574 2085.!~ 6979 37 45 6327.68 6263,68 $~4.00E 455.17 S 2i00.08 E 2148,84 S 77 46 14 ~ 0,165 2142.03 7073 37 45 6402.01 6338,01 S74,50E 470.79 S 2155.a7 E 2206.29 S 77 40 44 E 0,326 2%99.57 7!66 37 0 6475.91 6411.91 S7a.OOE 486.12 S 22C9.80 E 2262.64 S 77 35 36 E 0.830 2256.0Z 725g 36 45 65a9.51 6485.5i S7~.75E 500,99 S 2262,97 E 2B17,76 S 77 ~1 0 E 0.399 2311.21 7352 36 20 662a.95 6560.95 S75.00E 515.62 S 2317,i0 E 2~72.78 S 77 27 i5 E 0,282 2367.~__~ 7445 36 0 6699.95 6635.95 S74.25E 530,20 S 2370.13 E 2a2~.71 S 77 23 25 E 0.605 2422~ 7538 35'45 6775,30 6711.30 S75,00E 544,65 S 2422.68 E 2483.14 $ 77 19 47 E 0.38~ 47~7_~ RECORD OF SURVEY ALL CALCULATIONS PERFORMED -BY I [¢ M ELECTRONIC COMPUTER T R U E D_.O~_L_E_G__ ~ MEAS. DRIFT VERTICAL SUB DRIFT ,.TOTAL COORDINATES ¢ L 0 S U R E $ ,,, S,%~~!_T,,¥ DEPTH ANGLE DEPTH SEA D I R ~'~. D.I STANCE ANGLE DEG/iOOFT D M DEG, D I,1 S 0 6a51.~3 6787,13 S75,00E 558,58 S 2474,68 E 2536,94 S 77 16 49 ~ 0,806 ?725 34 30 6928.37 6864.37 S76,00E 572.00 S 2526,55 E 2590,49 S 77 14 36 E 0.632 :'.. .................... i ...... , ............. '? ..... ;-- ......................................................... - 7818 34 0 7005.24 6941,24 S76,00E 584.66 S 257'7.34 E 2642,82 S 77 13 7 E 0.538 7912 34 0 7083.17 7019.17 S75.00E 597.82 $ 2628.23 E 8100 34 0 7239,03 7175,03 275,00E 625.25 S 2729.7i E 2800.41 S 77 5 55 E 0,147 ~195 33 30 7318.02 7254,02 $74.00E 639.36 S 2780.57 E 2853,13 S 77 3 2 E 0.616 28~6.7_2 ....................... .' 8290 33 15 7397,35 733B,35 S74,00E 653.76 S 2830,~1 k~ ................ 2.9.05_,...3..2 ..... S_._7~ 59 .... ~4 ..... E ...... ..0..,2.63_ .................... 2.89..8_,_9_8 8669 32 O 7715.77 7651.77 S72.00'E 71~,~1 S 3027.50 E ~110,42 S 76 44 25 E 0.604 8858 31 15 7876.c.~. 78i2.80 STO.OOE 745,6i S ~12i.03 E ~2(;~.8e $ 76 8952 31 0 795-~'"-P'Y ...... 789~-';'2"7 ........ 5~-'8-'-'-66E ......... ~-'g~-"()2 ..... S ......... 3i64-.~9 E .......... 32'5"~"'03 .... 5-76 27 4 9(746 30 45 8037.95 ~/'9'73.95 $66.00E 781,87 S 32i0,79 E 3304,62 S 76 18 50 E 0,617 3299,77 9141 31 0 8119.a9 80~-~-7/-+7) .....-g-~-4--,-0-0-E--802,47 S 3.254.98 E ~352,44 S 76 9 1 E 0.o17 3348,02 __ ~]~'1 0 8281.49 82i7,49 S59,00E 849.27 S 3340.30 E 3446.57 S 7D 44 5 g 1.096 344. . --9520 31 4-5 ..... ,~'4~-;j,-'3-,~ E'~379.38 S5a.OOE 905.59 S 3422.22, E 3540.01 S 7.5 10 40 E 1.531__ 0 · 277 9615 32 0 8524.06 8450.06 S53.75E 935.!6 S 3462.74 E ~586._~_.0 _~_..7_E__5~3 12 9709 32 0 8603,78 8539,78 S55.00E 964,18 S 3503,23 E 3633,49 S 74 36 42 E 9804 32 0 8684.34 8620,3a S54.25E 993,32 S 3544.28 E 3680.84 S 74 20 37 E 0,4._.1_8 ~OfiO_._%Z 3727.86 S 74 4 53 g 989~ 32 15 8763.95 8699.95 SSa.50E 1022,4a S 3584.,91 E 9993 3,2 i5 8844°29--8780,29 $5'"4--~-~."6,.-~---1-6-'5-i-"T9~--S 3626.il E 377~.62 S 73 ~9 ~9 E lOOm7 32 15 8923,79 8859,79 ~'5~-;'50E 1081,18 S 3666,89 E 3822,96 S 7~ 10180 32 15 9002,4a 8938,44 S5~,50E II10,00 S 3707,29 E 3869,90 S 73 19 54 E 0_,_277 ~_7_27.. -_43 O_.,.J._~_2.__ ...... .3 d2.2_,_~ ~. 10230 32 15 9044,73 8980.73 S54.50E 1125.49 S 3729,01 E B895.16 S 73 [Lt_LE 0._0~0 3~.95,_]fa. BOTTOM HOLE CLOSURE 3895~16 FEET AT S 73 12 18 E !4EASUP, ED DEPTH AND OTHER DATA FOR. EVERY T RUE MEASURED VEP,'I'ICAL SUB MD-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES 3693 3664, 3600 28 8 14,01 S 240.45 E 3802 376 ., 37O0 38 4027 3964. ~900 63 14 36,37 4143 406a, 4000 79 16 46,51 $ 444,64 E 4262 416a, 4100 97 18 58,71S 506,62 E 4382 4264. 4200 118 21 72,02 S 572,93 E ) . 4508 4.364, 4300 144 26 86,55 S 647,66 E 46.B5 4.464, 4400 171 27 101,73 $ 724.20 4761 4564.' aSO0 197 26 116,38 S 799,80 4887 4664. 4600 223. 26 131.60 S 874,98 E 5013 476g, 4700 249 26 147,14 S 949,86 E 5138 4854, z,,.800 274 25 163,47 S 1023,29 E 5263 4964. 4900 299 25 181,12 S 1096.37 5388 5064, 5000 324 25 51~ ............................ 5'; "64 , ...... ......... ............................... 5 5638 5264, 5200 374 25 216,4i S 1241,66 235,19 S 1313,91 5761 5364. 5300 397 23 253.99 S 1384.07 E 588z~ 5464. 5400 420 23 272,9B S 1452.64 6007 5564, 5500 442 22 291.67 $ 1521.41 6132 5664. 5600 468 26 312.03 S 1594,03 E 6259 5764, 5700 495 27 33~.17 S t669.12 E 522 27 354.88 S 1744,81 E ,, 6515 5964. 5900 551 29 377,24 S 1822,79 6644 6064. 6000 580 29 399.30 S 1900,68 6771 6164. 6100 607 2.7 420.90 $ 1976,94 6898 626a, 6200 634 27 441,62 S 2052.38 7025 6364, 6300 661 27 462.92 S 2127ell ].51 6464. 6400 687 26 483.86 S 2201.05 7276 6564. 6500 712 25 503.94 S 2273.32 -- 7400 666a, 6600 736 24 52~,11S 2.~_~,56__E 7524 6764. 6700 760 24 542,6~ S 7647 686a, 6800 783 2~ 560,90 S ~768 6964.--6900 804 21 577.87 S 7889 7064, 7000 825 gl 594,50 TRUE MEASURED VERTICAL 5LI8 F~D-TVD VERT:rEAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL C 00 R D_[ h~A_T_.Ei5 16~+ 164. 100 0 ' 0 0.67 N 264 364. 464 664 764 864 964 1064 1164 1...2 6__E 254, 200 0 0 1,nB , 354, :300 0 0 L,_{.~-_%_J~ ..................... 2_,.8.0. .... E 464. aO0 0 0 55~, 500 0 764 · 700 0 0 %.,._iA_N 5_, .48_.~ )-- 1064, 1000 0 0 4,_35 h.. .... 8.,1.9 E ! 154, 1 I00 0 0 1 ~ ~ 4 i ~ 6 4, ........ A~..o_0 ................ 2 ............................... o _~....5__9__~ ........................ 1.o,.~.z ...... g 1464 1464 · 1400 0 0 6 · 0.3__b ......... Ll_,_z.j._5 ..1~. ~ 1564 1564. 1500 0 0 6.5 1_~ .......... 1664 156 z~.. 1600 0 0 7 ._2~.___!'J ......... ! 3...,..S_ ~ E 1764 1764. 1700 0 0 7.51 1864 1864. 1800 0 0 1964 1964. 190C) 0 0 8 ,!~2 ~ ................ 1_..8._._~ 6 ...... E 2064 2064. 2000 0 0 8.94 IN 20.90 E 2164 2164. 2100 0 2264 2264. 2200 0 236a 2364. 2:300 0 246z+ 2464 · 2400 0 2 ~ 6 4 ...... 2-~'/:; ~-'. ....... 2-~-0 (i ........... o 2664 2664, 2600 0 0 9,~4 N 23,13 E 0 9.69 N 25,54 t 0 9,97 .N 28,14 ~ 0 .......................... !q..3_~_!L ........... ~R..?.i ..... ~ ................... ............................ '? .... 0 i0,26 N 33,86 E 0 10.26 N :36.98 ~ 2764 2764. 2700 .0 0 lO.i~ N 40.27 E 2865 2864, 2800 0 0 9.86 N 44.74 2o65 4 ..... . ~964, 2900 C 0 10,86 N b3,51 E 3066 3064, 3000 i 1 10.63 3!67 :3164, 3100 3 2 6,74 3270 3264, 3200 5 2 2,37 N . 106.i2 3373 3364. 3900 9 4 0.56 S 132.47 E 3478 346a. 3400 14 5 3,89 S 163.87 E 3585 3564. 3500 20 6 8,29 S 200,10 E tflEASURED DEPTH_. ' ' ' ~:: ~ '" "-,', ..... , ND 0 L-ti: I~ A ...... c, c .... , .... A . .~_ .....~. ..... A 7[ ...... JE.~..P,_.E.V.E.ItY_.E.V.r_i.,L_.~.O.O_..f_~ -~.PT--~-F--,~k~[~--oE-A--D-L.:-P-.TH-, , ..i ......... '_.f. ...... :iL.'_-. ...... _"_.: ............. j__'_'J__ ................. ......... ....... ' DEPTH DEPTH ,SEA DI FLRtNCiIE. (~ORI.~CTION TOTAL CO0~D.~I~.A_IE~ .................... 8009 7164. 7100 845 20 8130 72~4, 7200 866 21 8250' 7364. 7300 886 20 8370 7a64, 7400 906 20 666,12 $ 2872,72 8489 7564, 7500 925 8508 , ~7664 · 7500 944 8726 7764, 7700 962 8843 7864, 7800 979 8960 795a, 7900 996 '9076 8064. 8000 1012 9193 8164. 8100 1029 9310 826a. 8200 lOa6 9427 8364. 8300 106~ 9652 856Z~. 8'500 1098 9780 8664, 8600 1116 9898 8764. 8700 1134 10016 8864, 8800 1152 18 1022.44 S 18 1059,18 $ 56~6,04 lO13a 8964. 8900 1170 18 1095.92 TROE ~..!EA SUR ED VERT I CAL SUB DEPTH DEPTH SEA TOTAL COORDINATES 1000 999, 93.5, 4 · 09 .~,I. 7 ,,.70 __2000 1999. 1935, 8,66 N __1 _~2_~.~_ 7 3000 2998. 2934, ,11.~3 ~ 57.76 4000 3940,, 3876. ~ 34,24 S 373,12 5000 4753, 4689,. 145,51 S 94.2,18 6000 ~558, 5494, 290,57 S 15i7,43 7000 6344, 6280, 458,72 S 2i12,44 8000 7156, 7092, 610,95 $ 2675,65 10000 8850. 8786. 1054,16 1200 .... 2000- 2400 2 800 - S 600 ~ - . ....................... 40( 4 4800 5 :mOO VERTICAL '-SECTION SCALE i": I000' :ATLANTIC RICHFIELD CO. W E L-L--- .NO J-' 5 'RADIUS OF CURVATURE MAGNETIC MULTI-SHOT ALAREL TDEPTHSvD SHOWN ...... HORIZONTAIZ VIEW SCALE I"= I000' ATLANTIC RICHFIELD CO. WELL NO. 5-9 ' -" RADIUS OF CURVATURE MAGNETIC MULTI-/SHOT "I ,~.tlantlCRichtieldCompany Norlh Arn~:!can Producing Division North Al; District Post Office ~ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 September 7, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' D.S. 5-7 (22-5-10-15) Permit No. 77-13 D.S. 5-8 (22-6-10-15) Permit No. 77-24 t.~D .. S~._.~.5:~_, (33-32-11-15) Permit No. 77-34 D.S. 5-12 (41-31-11-15) Permit No. 77-14 D.S. 5-13 (43-29-11-15) Permit No. 77-26 D.S. 5-14 (13-29-11-15) Permit No. 77-33 Dear Sir' Enclosed please fi nd a Sundry the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /am Enci'osures Notice outlining our plans for Form i 0-403 REV. ~-10-73 Submit "Intentions" in Triplicate & "Subsequent Reports" In Duplicate. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMtT-~" for ~uch proposals.) o,L FF1 GAs F--1 WELLt" ~ WELL OTHER NAME OF OPERATOR Atlantic Richfield Company ADDRB$ OF OPERATOR P.O. Box 360; Anchorage, Alaska 99510 4. LOCATION OF WELL At surface 2546'N & 210'E of SW cr Sec. 32, T11N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR,'etc.) 64' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20254 6. LEASE DESIGNATION ANO SERIAL NO. ADL 28326 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudh0e Bay Unit 9. WELL NO. D.S. 5-9 (33-32-11-15) 10. FIELD AND POOL, OR WILDCAT rudh0e Bay Field-Prudh0e 0il Po01 11. SEC.,T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 32, T11N, R15E, UP1 12. PERMIT NO. 77-34 3orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ PULL OR ALTER CASING FRACTURE TREAT k MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Perforate SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval. All perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The downhole safety valve will be installed and tested upon conclusion of job. Estimated Start Date' 9/27/77 16. I hereby certify that the foregoing is true and correct TITLE District Drilling Engineer ZZ:_-..__-]- E (This space for State office use) APPROVED BY./~'u¢ ~--~-~:~TITLE= Pc[roleum [ngine~r CONDITIONS OF APPROVAL, IF ANY~ / See Instructions On Reverse DATE-- N'i3-77 ,~l~roved Copy, Re~umecl 02~01B STATE of ALASKA [~PAFI~4ENT CF NA~KTRAL ~ Division of Oil and C~as Cc~servati~n TO: ~-- FROM: O. K. Gilbreth, Jr. Hoyle H, Hamil~ '~P Ben L~-kmm~an ~~/, Petroleum Inspector DATE SUBJECT: July 12, 1977 B~ Preventer EquiF~_nt Tests an Arco's DS 5-9 }~l~lay, ~.~ul. y 4, 1977_- I de.-ted my h~ at 4:00 1~ for a 4:30 F~ '~ ~ s~~ed 5:30 ~-I departure via Wien flight #19 for Deadhorse. ~, at departure ~ we w~re ae~ised ~o pilot was available an~ w~ ~a~ited an ino~ing flight fram Kodiak for a flight crew. $~ depert~d Anc~horage at 6:30 ~4 and arriw~d over Deadh~rse via Fairbanks at 8:25 and found ~he airstr/p w~a~ed in. We circled the airstrip until 9:00 ~4and th~n ~. I proceeded to DS 5-14. ~Tuesday, .July 5 ,~ 1977 - Dcnnie Fields, Arco drilling for~m~qn, advised parker Rig' ~_~-4'i ~ and B~PE tests would ~y occur Friday, July 8th. 13 3/8" surface pipe was oam~te~ c~ DS 5-14. Wednesday, July 6, 1977 - Cc~duct~l BOPE tests cn DS 5-14 and moved to _%~}u~--_sdaY!-JU~=_Y-._ 7, 1977 - Te~ S~V's and ~'s m BP's J-5, E-1. ~i~y, .~y 8,. ~_~ - ~ ~'S ~ ~"S m ~'S H-2, H-3. ~~~y, J~y 9,_. 1977 - ~ ~ ~ ~'s ~ ~9 ~~ at 2:10 ~ joLnt ~f ~i~ p~ wi~ %~p ~le j~ ~ ~1 jolt ~] p~ ~ ~ p~s~ ~ ~ ~ f~t ~ ~, ~le. Top pipe rams, ball ~ floor safety valve. (%~ich was made ~p in the ~ of the test joint) and check valve in tb~ ~ill line tested to 5000 psig. ~ kelly valve, cuts~ ~-=lve on tbs ~5/1 line and cu~cside valve cr~ ~%e choke ~ ~ ~ 5000 psig. I~ide valve cn ~ kill lin~, inside valve ~n the chnke ~ and kelly cock tested to 5000 psig. Annular preventer ~ ~ ~ 3000 psig. Lower pipe rams tested to 5000 psig. Eight valves an~. twenty flanges in ~m Choke manifo~ tested to 5000 gsig... The Swaco superchoke was actuated fully cp~ and .fully closed and th~ manual adj~le choke was free moving. Dart type flaor valve was an the floor. While waiting on backing cut. of the teo~t plug to %est the blind rams I toure~ ~ locatic~ v~i~ was w~ll organized., the rig in good .repaY, reserve pit well budlt, steel wel~ fuel tanks not Bmrmed and ~,~11 sign not yet received. Accumulator .pressure %~s 2750 .spig. N2 backup bottles res%ed 2000, 1900, 1700 and 1900 psig. Finally, ~ blin~ ra~s ~ested to 5000 psig and tests w~re cc~cluded at 4:10 ~4. A field iD~~ report was prepared with the original given to Ken Jc~es, a copy mailed to Bob Hines, and a copy attached to this report. I ~ a~ited HP persc~m~_l for test/rig SSSV's and SCSV's c~ Tested SSSV's and SCSV's c~ BP's H-6, H-7, and H-8. I dsparted ~se via Wien flight #2 at 6:25 PM and arrived in And3orage via Fairbanks at 8:35 PM and at r~y h~ne at 9:05 PM.. ~_~___~: I wi~ ~ful BOPE test on Arco's DS 5-9. sati-sfactory Yes NO Item (~l_Ocation,General (,) (~ 1.'~Wel.1 Sign (.~ ( ) 2. General Housekeeping ( (~() () () () () () () () () () () () () () () () () () ~a~is~ac~ory ~ype ~nspec~ on Yes ~No ~Item (~OPE Tests (~() 15./~asing set (~ ( ) 16. ~"~fluid-( )wt~~ud t.. Reserve Pit-( )open( )filled 4-. Rig' ( ) safety:Valve Tests 5. Surface-NO. Wells 6. Subsurface-No. Wells ( ) ~Well Test Data 7. Well Nos. , , , 8. Hrs. obser , , , 9. BS&W , , , 10. Gr. Bbls. ( ) Fi nal Abandonm~-n~-- (~- ( ) (~(). (~F() (~() (~7' ( ) (~() () (~.~,' () (~() (~() 1.1 P&A Marker (~ ( ) lZ. Water well-( )capped( )plugged (~ ( ) 13. Clean-up (~)" ( ) 17, Master:Hyd. Control SYS~.-j~t'.~Psig 18. N2 btls~~~~pslg'. 19. Remote Controls 20. Drilling spool- ,,~ "outlets 21. Kill Li.ne-(~)~Check valve 22. Choke. Flowline ( ) HCR valve 23. Choke Manifold No. valvs~_flgs-~--~b 24 Chokes-(J~)~emote( )P,os.(~dj 25. Tes-t ~lug-(i~)q~.tlhd( )csg( .)none 26. Annular Preventer~sia 27. Blind Rams~'~.sie 28. Pi pe Rams ~--~ psi q 29. Kelly & Kelly-cock~psig 30. Lower Kelly valve ~__~__~psi.o 31 Safety Floor valves-(~)q)V ( J~/~Fart ( ) ( ) 14. Pad l'eveled (~ ( ) Total inspection observation time~___hrs/da~j~ Total number leaks and/or equip, failures Remarks days or when ready June iS, 1977 P~ Bay ~ s-g(xx-32-11-15) atlantic ?dchf~ ~t ~. 77-34 Enc~ is ~ ap~Dved applicati(m for peratit to drill the above ref~ well at a locatic~ Lu Sec~- .~mn 32, Town~p 10N, Range 15E, ~11 ~les, ~ chips ar~ a ~ log are not required. A directional s~ is }~any rivers ~ ~ ~ their drainage systems have been classified as ~%0c~cant ~ ~ sp~ or migration of anadru~us fish. Operations in these ~ ~ ~~ to ~ 16.50.870 and the regulations ~gated th~_~e~ (Title 5, Ala_~ ~strati~ Coae). Prior to ~ing operations you may ~ cc~bacted by the Habi~t ~tor's office, Depart- m~nt ~ Fish Pollution of any wa%ers of ~ State is pr~ited by AS 46, Chapter 03, Article 7 ~ ~ regula~ ~ga~ thereunder (Title 18, Alaska Administrative ~, ~ 70) and by the Federal 9~ter Pollution Control a representative of ~ De~t of Envirc~men~i Conservation. Pur~ant to AS 38.40, ~ H~ ~ State Leases, the Alaska Dep~ut't~nt of ~ is beLng ~ied of ~ issuance of this permit to drill. To aid us in ~~ field ~, ~ %~uld appreciate .your notifyi~$ this office within 48 ~ after ~ well is s~. ~qe would also lik~ to be. ~~ so that a rep~tive of the Division ~y be present to witness tes~ ~ blc~ut p~ter eq~t before surface casing shoe is drilled. F. M. Brown -2- P. B. DS 5-9 June 15, 1977 In ~ event of suspe~-~io~ ~r abandonment please give this ~ffice adequate adv-~r~e n~ific~i~ so that w~ may have a witr~ss Erese~t. Very truly ~s, o. ~. ~i~, ~r. Enclosure c~: De~ of Fish and ~, Habitat Secti~ w/o encl. Department of ~ C~_~er~a~ w/o encl. Divisic~ W/O e~cl. AtlantjcRichfieldCompany ~'~ North Ame-'~'~n Producing Division North Alas~. District Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 June 7, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska i9501 Subject' D.S. 5-9 (xx-32-11-15) .... "'/'~,~ ~. ~'' ~'~ Dear Mr. Hamilton: Enclosed is our Application for Permit to Drill together with the $100.00 application fee and survey plat for the above-mentioned wel 1. Very truly yours, F. M. Brown District Drilling Engineer /kb Enclosures Fo,m ~o.~o~ API No. 50-029-20254 REV. 1-1-71 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITT'EE PERMIT TO DRILL OR DEEPEN la TYPE OF WORK DRILL E~] DEEPEN J--1O)` ' b. TYPE OF ¥,'EI.L OIL GAS SINGLE ,,~LL [~ WELL [--] . OTHER ZONE 2. NAME OF OPERATOR Atlantic Richfield Comp.any 3.ADDRESS OF OPERATOR ~ P.O. Box 360; Anchorage., hlask, a 99510 4. LOCATION OF WELL At surface 2546'N & 2IO'E of SW cr Sec. 32, Tl lN, At proposed prod. zone (@ 8800' ss) 1620'N & 1200'W of SE cr Sec. 13, DISTANCE IN MILES AND DIRECTION FROM NEAREST TOW~ OR POST OFFICE* Approximately 6 miles NE of Deadhorse SUBMIT IN TRI' ~ATI:. (Other instruc m reverse si, MUL[I PLE 'ZONF F--] R1 5E, UM 32, TllN, R15E~ .UM 6. LEASE DESI(;N.%T1ON AND St;RIAL NO. ADL 28326 7. It: 1NDI -\N, AL LO'I TEl-] OR '[ RI lie NAME $. UNFF FARM OR LEASE NAMI: Prudhoe Bay 9. WELL NO. D.S. 5-9 (xx-32-11-15) 10. FIELD AND POOL, OR WII.DCAI' Prudh0e Bay-Prudhoe 0il 1 I. SEC., T.. R., 51., ~ BOTTOM tlOLE OBIEC1 IVE) Sec. 32, TllN, RI5E, UM 1~. 14, BOND INFORMATION: #801 tWE Statewides,re,~,,d/or~o. Federal Insurance Co. 1-38-40 *mo,n, $100,000.00 Po01 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERIY OR LEASE. LINE, FT. (Also to nearest drig, mdt, if any) 1200' 18. .DISTANCE FROM PROPOSED LOCATION 16. No. OF ACRES IN LEASE 2491' ~9. PROPOSED DEPTH ' 9080'+ TVD IO NEAREST WELL DRILLING. COMPLETED, OR APmED ~.'oR, FT. 21. ELEVATIONS {Show whether DF, RT, CR, etc.) 64' RKB, 35' Pad Elevation (Bravel) NO,ACRES ASSIGNED TO Tills WELL 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL START July ll, 1977 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH J Quantity of cement ' '32" '' 20" 94 lb." H-40 146"+MD '300 sx Permafrost II tq. surfa, ce', ~.17-1/2" .... !3-3/8" 72' lb. MN-80 .2700' +-MD Circ to. surface-Approx 5500 sx 12-1/4" 9-5/8" 47 lb. .~I0 & 95 10400'+-MD 1500~+ cmt column-On ls_~_ s~;age · '- . .... - 700 s--x) pltis 300'+ co-lumn on 2nc t-.. stage (Approx 300--sx) · Atlantic Richfield Company proposes to directionally drill this well to IO,400'+MD, 9080'+_TVD to produce the Sadlerochit zone. Logs will be run across selected intervals. ~ 13-5/8" 5000 psi Hydril and 13-5/8" 5000 psi pipe and blind rams will be used on the 13-3/8" casing. The BOP equipment will be pressure tested each week and operationally tested each trip. A ,tring of 5-1/2" 17# N-80 tubing, packer and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A non-freezing fluid will be left in all uncemented annuli .within the permafrost interval. >pro: IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If propesal is ,'.o deepen give data on. present productive zone and proposed new productive zone. If P~oposal is to drill or deepen dkectionally, ~ve pertinent data on subsurface locations and measured and t~ue vertical depths. Give blowout preventer program. 24. I hereby cer*~iify that the,~pregoing is True and Correct DATE, 50-029-20254 (This space for State office use) CONDITIONS OF APPROVAL, IF ANY: SAMPLES AND CORE CHIPS REQUIRED I MUD LOG J OTHER P.~%QL'IREMENTS: '[7]'YES [~ NO ~ YeS ~ NO DIRECTIONAL SURVEY REQUIRED tX.P.L NUMk- RICAL CODE ~ YES TITLE District Drilling Engr. PERMIT NO. APPOVED BY 77-34 · :kPPROVAL DATE_ ,oZ~ Chairman Reverse Side June 15, __ I)ATE 1977 June 15 ,_1977 / SEC. 31 ~ SEC. 6 Well Well 17 Well 16 Well 15 Well 14 WEST DRILL PAD Well 13 Well 12 ii"" · Well 7 259' ! SEC.3?- Section Line. SEC. 5 CERTIFICATE OF SURVEYOR I HEREBY CERTIFY THAT I AM PROPERLY REGIS- TERED AND LICENSED TO PRACTICE LAND SUR- VEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. _ · DATE Well No. 18 fiT. fO° 16 00. .~NG. t48° Wel No. 17 LAT. 70° LONG. 148° Wel No.16 LAT. 70° LONG. 148 o Wel No. 15 LAT. 7()° LONG. 148° Wel No. 14 LAT. 70° LONG, 148° Wel No.13 LAY 70° LONG, I 4 8° Wel No. 12 LAT. 70° LONG. 148° Wel No.I I LAT. 70° LONG. 148° Wel Nc. lO LAT. 70° LC, NG. 148r' Well No. 9 LAT 70° LONG. 148° Well No. 8 LAT. 70° LONG. 148 o Well No. 7 LAT. 70~ LONG. 148° Y 5 949 7F~3. 14 23.920" X 697 035.49 15'59.801" Y 5949 646.72 24'23.188" X 697 065.G9 15' 58.647" 24 22.462" 15 57.495" 24 21.735 15' 56.334" 24'20.999" 15'55 183" 24' 20.266" Y 5 -949 530.13 X 697 091.68 Y 5 949 4 13.71 X G97 I I:J.71 Y 5 949 296.35 X 697 48.0~ Y 5 949 80.05 X 697 76.35 15'54.028" Y 5 949 063.31 24' 19 560" X 697 205.66 15'51.716" Y 5948(d29.61 24' 18.1 14" X 697 259.47 15'50 567" Y 5 948 /13.50 24'17.577" X (';97 287.86 15'4L,4411 " Y 5 948 596.60 24'16_048" X 69T3t5.98 15'48.256" Y 5 948479.91 24'15.930" X 697 54'3.72 [2 IADDEDWELLS7--II 8~ 13-~-~'-- '~4/77.1PC L I [~ODED WELL No. 12 [ 4/77__[600 / .... ~Vh ~-Ibfi ........... . [' DATE ATLANTIC RICHFIELD CO. AS-BUILT DRILl_ SITE No. 5 Located in Protracted Sections 31 &32, TIIN ,RI5 E, UMIAT MERIDIAN, ALASKA PREPARED BY HEWlTT V. LOUNDSBURY & ASSOCIATE,C. 72=5 W 6th AVENUE,ANCHORAGE, ALASKA DATE APR.1511977 CHKD BY GDD SCALE I" = 300' FLDBK, 77-2 CHECK LIST FOR NEW WELL PERMITS 1. Is the permit fee attached ........ : ..... · ...... 2. Is well to be located in a defined pool .............. 3. Is a reqistered survey plat attached 4. Is well located proper distance from property line ......... 5. Is well located pFoper distance from other wells ......... 6. Is sufficient undedicated acreage available in this pool ...... 7. Is well to be deviated . ' .............. 8. Is operator the only affected party ................ ..... 9.Can permit be approved before ten-day wait .............. 10. Does operator have a bond in force ................ tl. Is a conservation order needed ............. t2. Is administrative approval needed .............. 13. Is conductor string p~ovided .................... 14. Is enough cement used to circulate on conductor and surface .... 15. Will cement tie in surface and intermediate or production strings 16. Will cement cover all known productive horizons .......... 17. Will surface casing protect fresh water 7ones ......... Comp a ny ~ ~/xC! Yes No Remarks 18. Will all casing give adequate safety in collapse, tension & burst 19. Does BOPE have sufficient pressure rating - Test to '~. ~ psig 20. Has DMEM approved Plan of Operation ............... Additional Requirements: , I Approval Recommended' Geologs' EnQineering' ~ HWK/-~..~,~.~. LCS ,/c'.q~ RAD Revised 11/17/76 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX.' No 'special'effort has been made to chronologically organize this category of information. .o / /. .