Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
175-026
RECEIVt:.U _ STATE OF ALASKA I ^ ALAS~ILAND GAS CONSERVATION COM SSION MAR 1 7 200b WELL COMPLETION OR RECOMPLETION REPORT AND LOG 'I & G Cons Commission Alaska 01 as . Anchorage 1a. Well Status: D Oil DGas D Plugged 1m Abandoned D Suspended DWAG 1b. Well Class: 20AAC 25.105 20AAC25.110 D Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic 1m Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 12/11/2005 175-026 305-363 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 06/04/1975 50- 029-20160-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 07106/1975 PBU 01-08 4204'FSL,3758'FEL,SEC.08,T10N,R15E,UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 1515' FSL, 3495' FWL, SEC. 04, T10N, R15E, UM 72' Prudhoe Bay Field I Prudhoe Bay Pool Total Depth: 9. Plug Back Depth (MD+ TVD) 1583' FSL, 4182' FWL, SEC. 04, T10N, R15E, UM 2500 + 2500 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 698864 y- 5939851 Zone- ASP4 13550 + 9139 Ft ADL 028328 -- ------ 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 706037 y- 5942636 Zone- ASP4 Total Depth: x- 706722 y- 5942722 Zone- ASP4 N/A MD _n_ --- -- -- -----. - _________n__n 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 1m No N/A MSL 1900' (Approx.) - 21, Logs Run: DIL, Sonic I GR I Density, CBL 2. CASING, LINER AND CEMENTING RECORD CASING ~ETTING )EPTH MO - ~ETTING I EPTH TVD HOLE - }V.4QUNr SIZE Wr. PÉR.FT. GAADE Top I BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 100' Surface 100' 32" 13-318" 72# MN-80 Surface 2674' Surface 2674' 17-1/2" 6400 sx Permafrost II 9-5/8" 47# MN-80 I SOO-95 2390' 11960' 2390' 8188' 12-1/4" 1500 sx Class 'G', 125 sx PF II 7" 29# MN-80 11647' 13550' 8809' 9139' 8-1/2" ~OO sx Class 'G' 23. Perforations oRen to Production (MD + TVD of Top and 24. TUBING RECöRD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 5-1/2", 17#, L-80 2950' - 11406' 11395' MD TVD MD TVD 4-1/2", 12.6#, MN-80 11406' - 11534' 25. ACIP,FFlACTURE, CEME.NT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED '\1\";':'-,,£· !J) , P&A wI 93 Bbls of Class 'G' ,/ ->ç 'J,: (. 11100' 2500' Set CIBP 2370' Set EZSV / 2350' Set Whipstock 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Injection N/A Date of Test Hours Tested PRODUCTION FOR Oll-BSl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oil -BSl GAs-McF WATER-Bsl Oil GRAVITy-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None R80MS BfL MAR .2 0 2006 ~ , 't,Gk ~\q'(, Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE I \.:J 28. GEOLOGIC MARKER 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results, List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state 'None', Sag River 12515' 8519' None Shublik 12579' 8558' Sadlerochit 12683' 8623' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the forego' Signed Terrie Hubble PBU 01-08 Well Number Title Technical Assistant Date D3 It ~ (ðro 175-026 305-363 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on alllypes of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Ken Allen, 564-4366 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated, Each segregated pool is a completion, ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness, ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain), ITEM 27: If no cores taken, indicate 'None', ITEM 29: List all test information. If none, state 'None'. Form 10-407 Revised 12/2003 Submit Original Only e e Well: Field: API: Permit: 01-08A Prudhoe Bay Unit 50-029-20160-01-00 205-195 Accept: Spud: Release: Rig: 12/26/05 01/03/06 02/07/06 Nabors 2ES .... ....... ··....·,·v·y, PRE-RIG WORK 11/29/05 BAILED FILL FROM TOP OF PLUG BODY. PULLED 4.5 PX PLUG BODY. DRIFTED W/3.625 CENT, TEL, AND SAMPLE BAILER. TAGGED TD AT 13,301' CORR MD, 12/1 0/05 FLUID PACK COIL AND PUMP 1.3" BALL FOR DRIFT. BALL RECOVERED. STAB BACK ON WELL AND PERFORM BOP TEST; PASSED. POP OFF AND SHUT DOWN FOR NIGHT. JOB IN PROGRESS (TO PLUG AND ABANDON PERFS). 12/11/05 MU BHA 2.5" BDN. STAB ON WELL AND PT. RIH AND TAG LINER TOP AT 11647' CTM. POOH. ADD STINGER AND RBIH. TAG TD AT 13314' CTMD. PUMPED AND LAYED IN 93 BBLS OF 15.8 PPG CLASS 'G' CEMENT. 12 BBLS BEHIND PIPE FOR 300 PSIG PRESSURE BUMP. EST TOC AT 11100'. POOH. TRAPPED 350 PSIG WHP. WELL IS FP WITH 60/40 METH. JOB COMPLETE. 12/13/05 DRIFT WI 4.55" CENT AND SAMPLE BAILER TO 10245' SLM, NO SAMPLE. DRIFT WI 3.625" CENT AND SAMPLE BAILER TO 10275' SLM, NO SAMPLE. SHOT 4.15" TUBING CUTTER AT 2966'. CCL STOP DEPTH = 2951.7'. CCL TO CUTTER = 14.25'. CUTTER SHOOT DEPTH = 2966'. TIED INTO SSSV NIPPLE AT 2223', BASED ON WELL SKETCH PROVIDED. BP EXPLORATION Operations Summary Report Page 1 ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-08 01-08 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Start: 12/26/2005 Rig Release: 2/7/2006 Rig Number: Spud Date: 6/4/1975 End: 2/7/2006 Date From - To Hours Task Code NPT Phase Description of Operations 12/25/2005 09:00 - 11 :00 2,00 MOB P PRE Lay down derrick, Pull shop and pits away from sub base. 11 :00 - 12:00 1,00 MOB N WAIT PRE Wait on Security for escort, 12:00 - 00:00 12.00 MOB P PRE Move sub base off of well Y-11Ci and to D,S, 1 well # 8, 12/26/2005 00:00 - 07:00 7,00 MOB P PRE Move sub base from Y-11Ci to D.S, 1 well # 8, 07:00 - 12:00 5,00 RIGU P PRE Spot rig over well. Double mat under sub base and set rig. 12:00 - 13:00 1.00 RIGU P PRE Close cellar doors and cover cellar. 13:00 - 20:00 7,00 RIGU P PRE PJSM, Raise and pin derrick. Set pipe shed chute, Spot pits, shops and shacks, Bridle down derrick. R/U floor. Spot and berm cuttings tank. Complete pre-spud check list. Take on seawater. 20:00 - 20:30 0,50 WHSUR P DECOMP Hold pre-spud meeting with drill crew, Tool Pusher & WSL. Rig accepted for operations @ 20:00 hrs 12/26/2005. 120:30 - 22:30 2,00 WHSUR P DECOMP Install secondary annulus valve. R/U circ lines in cellar and to cuttings tank, 22:30 - 23:00 0,50 WHSUR P DECOMP RlU DSM lubricator & pull TWC valve, 23:00 - 00:00 1,00 WHSUR P DECOMP Pump Safe Surf pill and circ out diesel freeze protect through cut tubing @ 2950'. Displace well to clean seawater. Pump 260 bbls down tubing to annulus through choke to slop tank, 12/27/2005 00:00 - 01 :30 1,50 PULL P DECOMP Circ out freeze protect and displace well to clean seawater @ 5 bpm @ 1100 psi. 01 :30 - 02:30 1.00 WHSUR P DECOMP Set BPV and test from below to 1000 psi. 02:30 - 05:00 2.50 WHSUR P DECOMP NID tree and adaptor flange, remove from cellar. Dress wellhead. Install blanking plug, 05:00 - 06:30 1.50 BOPSUF P DECOMP N/U 13 5/8" x 5000 psi BOPE. 06:30 - 07:30 1.00 BOPSUF P DECOMP M/U test joint. Blow through choke manifold, kill and choke lines. 07:30 - 17:30 10,00 WHSUR P DECOMP Test BOPE to 250 low & 4000 psi high test. Test annular preventor to 250/2500 psi. Test top, bottom & blind rams. HCRs, manuals and choke manifold and valves on top drive. Perform Koomey test. RID test equipment and blow down all lines. Test witnessed by AOGCC Rep. John Crisp, Co. Rep, John Rail and Tool pusher Cleve Coyne. 17:30 - 18:30 1.00 WHSUR P DECOMP P/U tools and retreive FMC blanking plug, UD tools & plug. 18:30 - 19:30 1.00 WHSUR P DECOMP P/U DSM lubricator and extension. Pull BPV, RID DSM. 19:30 - 21:30 2.00 WHSUR P DECOMP P/U single of drill pipe and double spear. Attempt to spear weld neck tubing hanger. Grapples would not enter hanger, Change 121:30 - 00:00 to smaller grapples and spear hanger. 2.50 WHSUR P DECOMP BOLDS. Pull hanger free with 190K, UWT = 75K. Pull hanger to floor, Flow check. Release spears, break out hanger. Clear rig floor. RlU power tongs and casing tools. Bring Control line I spooling unit to rig floor. 12/28/2005 100:00 - 01 :00 1.00 WHSUR P DECOMP RlU and reverse circ out seawater contaminated with diesel. 01 :00 - 05:30 4.50 PULL P DECOMP POH UD 5 1/2· 17# tubing from cut @ 2950'. Recovered 93 105:30 - 06:00 joints of tubing, 1 SSSVLN, 1 cut joint 13_15' long and 64 SS bands, RID casing tools. Clear and clean rig floor. 0.50 BOPSUF P DECOMP P/U 5' test joint and RlU to test BOPE. 106:00 - 09:00 3.00 BOPSUF P DECOMP Test BOPE with 5· test joint. Test top rams, bottom rams & top i drive valves to 250 low test and 4000 psi high, Test annular preventor to 250/2500, Test witnessed by Rig Rep, John Rail & Tool Pusher Cleve Coyne, 09:00 - 09:30 0.50 BOPSUF P DECOMP Pull test plug, UD test joint. Blow down top drive and all lines. 09:30 - 11 :30 2,00 CLEAN P DECOMP P/U 9 5/8· casing scraper, 8 1/2· bit, bumper sub, 9 drill collars & 18 HWDP. RIH to 856'. Printed: 2/1312006 12:00:39 PM BP EXPLORATION Operations Summary Report Page 2 .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 01-08 01-08 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Start: 12/26/2005 Rig Release: 2/7/2006 Rig Number: Spud Date: 6/4/1975 End: 2/7/2006 Date FronT-To Task Code NPT Description of Operations 12/28/2005 11 :30 - 13:30 2.00 CLEAN P DECOMP RIH P/U drill pipe to 2751'. 13:30 - 14:30 1.00 CLEAN P DECOMP Pump Safe Surf pill & CBU @ 625 gpm @ 950 psi. 14:30 - 15:30 1.00 CLEAN P DECOMP POH from 2751' to 856'. 15:30 - 16:30 1.00 CLEAN P DECOMP Stand back HWDP & D,C,s, Break & UD bit, casing scraper, float sub, bumper sub & jars. 16:30 - 17:00 0.50 DHB P DECOMP M/U 9 5/8" CIBP to drill pipe. 17:00 - 20:00 3.00 DHB P DECOMP RIH @ 90 fpm P/U drill pipe. 20:00 - 20:30 0.50 DHB P DECOMP Wash down from 2495' to 2505'. Set CIBP @ 2500' and shear off. Pull 1 stand of drill pipe. 20:30 - 21:00 0.50 DHB P DECOMP M/U 9 5/8' RTTS and set @ 29'. 21:00 - 22:00 1.00 DHB P DECOMP Test 9 5/8" casing & CIBP below RTTS to 3000 psi. Unsting & pull running tool. Close blind rams & test above RTTS to 3000 psi. 22:00 - 00:00 2.00 BOPSU DECOMP Drain BOP stack & install test plug, PJSM. Change lower set of rams to 9 5/8' casing rams. 12/29/2005 00:00 - 00:30 0.50 BOPSU DECOMP Test lower BOP door seals to 250 low, 4000 psi high test. 00:30 - 01 :00 0.50 BOPSU DECOMP BOLDS & pull test plug. 01 :00 - 01 :30 0.50 DHB DECOMP RIH with RTTS running tool to 29' and sting in to RTTS, Pull to rig floor. 01 :30 - 02:30 1.00 DHB P DECOMP POH from 2400' & UD CIBP running tool. 02:30 - 04:00 1.50 STCTPL P DECOMP M/U Baker 8 1/4' MultiString casing cutter on drill pipe, 04:00 - 05:30 1,50 STCTPL P DECOMP RIH with casing cutter to 2390', 05:30 - 07:00 1,50 STCTPL P DECOMP Cut 9 5/8" casing at 2390'. Pump @ 134 gpm @ 575 psi, 60 rpm, 07:00 - 08:30 1.50 STCTPL P DECOMP POH with casing cutter. (wet) 08:30 - 09:00 0.50 STCTPL P DECOMP UD casing cutter tools and clear rig floor. 09:00 - 10:00 1.00 STCTPL P DECOMP M/U 9 5/8" casing spear assy. 10:00 - 12:00 2.00 STCTPL P DECOMP Spear casing @ 2390', BOLDS. Heat wellhead with steam, 12:00 - 13:30 1,50 STCTPL P DECOMP Disengage spear & UD, MIU packoff running tool. Engage top of hanger and rotate packoff seal assy 1/4 turn counter clockwise, UD packoff tool and MIU spear. Change out grapple on spear and MIU to top drive, Engage hanger with spear. Pull 190K to unseat hanger, P/U 3' and close annular preventor. 13:30 - 15:30 2.00 STCTPL P DECOMP Line up through choke to take returns to cuttings tank. Attempt to break circ, Pressure up slowly to 1270 psi, pressure dropped to 1100 psi @ 1.5 bpm. No returns. Bleed off, open annular preventor and attempt to circ. Work pipe and stage up to 1000 psi. Pull hanger to rig floor. Packoff on spear not holding, Land hanger, break out spear and change packoff cup. Blow down top drive and kill line. M/U spear to top drive, monitor well, 15:30 - 19:00 3.50 STCTPL N HMAN DECOMP Thaw hard lines to cuttings tank. 19:00 - 21:00 2.00 STCTPL P DECOMP Engage casing hanger with spear and pull hanger to rig floor, UWT = 175K. Attempt to break circ while working pipe. No returns, injecting @ 3 bpm @ 1000 psi. Mix and pump dry job. 21 :00 - 21 :30 0.50 STCTPL P DECOMP PJSM. Install false bowl & slips, disengage spear & UD. RIU tongs, break & UD casing hanger, RIU power tongs, change elevators, 21 :30 - 00:00 2.50 STCTPL P DECOMP POH UD 9 5/8" casing from 2390'. Pipe connections tight and hard to break. R/U double line on break out tongs. Steam casing collars before breaking, Fill hole through 9 5/8" casing as hole will not take fluid down the backside due to Arctic Pack sheath between the 13 318" and 9 5/8" casing, 12/30/2005 00:00 - 17:00 17.00 STCTPL P DECOMP POH UD 9 5/8" casing from 2270'. Connections tight and hard Printed: 2/1312006 12:00:39 PM , . - '- BP EXPLORATION Page 3" Operations Summary Rep.ort .... ." Legal Well Name: 01-08 Common Well Name: 01-08 Spud Date: 6/4/1975 Event Name: REENTER+COMPLETE Start: 12/26/2005 End: 2/7/2006 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/7/2006 Rig Name: NABORS 2ES Rig Number: Date From - To Hoúrs Task Code NPT Phase DescriptiÖnof ()perations 12/30/2005 00:00 - 17:00 17.00 STCTPL P DECOMP to break, Using double line on break out tongs, Steam casing collars before breaking, Fill hole through 9 5/8' casing as hole will not take fluid down backside due to Arctic Pack sheath between 133/8' x 95/8' casing. Recovered 60 joints, 1 cut joint 27.25' long and 13 bow spring centralizers, RID casing tools, clear & clean rig floor. 17:00 - 17:30 0.50 STCTPL P DECOMP P/U 9 5/8" casing spear (from previous run) break & UD. 17:30 - 18:30 1,00 CLEAN P DECOMP P/U 133/8" casing scraper BHA to 517'. CBU, Arctic pack returns, 18:30 - 21:00 2.50 CLEAN P DECOMP RIH Break circ @ 880' & 1350'. RIH to 9 5/8" casing stump @ 2390'. 21 :00 - 22:30 1,50 CLEAN P DECOMP Pump Safe Surf pill and circulate out Arctic Pack with 110 degree seawater, CBU, Rotate & reciprocate, Pump Safe Surf pill #2 and CBU, returns clean, 22:30 - 23:00 0,50 CLEAN P DECOMP POH to BHA @ 880', 23:00 - 23:30 0.50 CLEAN P DECOMP Rack back HWDP & drill collars. 23:30 - 00:00 0.50 CLEAN P DECOMP UD drilling jars & casing scraper. 12/31/2005 00:00 - 01 :00 1,00 CLEAN P DECOMP UD 13 3/8" casing scraper assy, Clear rig floor. 01 :00 - 01 :30 0,50 BOPSUF P DECOMP Set wear bushing, RILDS, 01 :30 - 02:00 0,50 EVAL P DECOMP PJSM. RlU SWS and GyroData, 02:00 - 04:30 2,50 EVAL P DECOMP RIH with GyroData gyro and take surveys @ 100' intervals to 2350'. POH with wire line, UD gyro 04:30 - 06:30 2,00 DHB P DECOMP Re-head SWS rope socket and prepare to run CCL & 13 3/8" EZSV plug. 06:30 - 08:00 1,50 DHB P DECOMP RIH with 133/8" EZSV & CCL to 2350', CCL not locating. POH with wire line, UD EZSV. 08:00 - 09:30 1,50 DHB P DECOMP Re-run CCL to 2350', POH, 09:30 - 10:30 1.00 DHB P DECOMP P/U 133/8" EZSV and RIH, Set the top of the plug @ 2370'. POH with wire line, 10:30 - 11:00 0.50 DHB P DECOMP RID SWS, Clear rig floor, 11 :00 - 14:00 3.00 DHB P DECOMP M/U 5" mule shoe on HWDP & RIH to 572'. P/U 133/8" RTTS, Set RTTS below wellhead. Test 133/8" casing, pressure up to 1650 psi below RTTS, no test. Pressure up above RTTS to 2000 psi, OK. Leave RTTS set & POH, UD running tool. 14:00 - 15:30 1.50 DHB P DECOMP Change bottom rams from 9 5/8' to 2 7/8" X 5" variable. 15:30 - 17:00 1.50 DHB P DECOMP Pull wear ring, set test plug. Test bottom rams to 250 low, 4000 psi high test. 17:00 - 17:30 0,50 DHB P DECOMP Pull test plug, set wear ring, UD test joint. 17:30 - 18:30 1,00 DHB P DECOMP M/U RTTS running tool. RIH and engage RTTS, release and pull to rig floor. UD RTTS. 18:30 - 19:00 0.50 DHB P DECOMP POH with HWDP from 572'. 19:00 - 19:30 0.50 DHB P DECOMP P/U RTTS & circ valve, 19:30 - 22:30 3.00 DHB P DECOMP RIH with RTTS to 571'. Test 133/8" casing to 2000 psi, OK. RIH, test casing @ 1141' and 1711'. Tag EZSV @ 2370'. POH to 2280'. Test below RTTS, pressure up to 2000 psi, test bled off rapidly to 875 psi. Test above RTTS to 2000 psi, OK. 22:30 - 23:30 1,00 DHB P DECOMP POH with RTTS from 2280', 23:30 - 00:00 0,50 DHB P DECOMP Break & UD RTTS. Clear rig floor. 1/1/2006 00:00 - 00:30 0.50 DHB P DECOMP UD 133/8" RTTS, clear rig floor. 00:30 - 01 :30 1,00 STWHIP P WEXIT Bring subs and tools for whipstock BHA to rig floor. 01 :30 - 06:00 4.50 STWHIP P WEXIT P/U whipstock BHA & GyroData gyro tool to 158'. Orient tools and UBHO sub. 06:00 - 07:00 1.00 STWHIP P WEXIT Upload MWD tools. Diffaculty reading GyroData. Printed: 2/1312006 12:00:39 PM · .. Page 4_ BP EXPLORATION Qperat,ions Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 1/1/2006 1/2/2006 01-08 01-08 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Hours Ta.sk Phase 07:00 - 08:00 1.00 STWHIP P WEXIT 08:00 - 09:00 1,00 STWHIP P WEXIT 09:00 - 10:30 10:30 - 13:00 1.50 STWHIP P 2.50 STWHIP P WEXIT WEXIT 13:00 - 14:30 1,50 STWHIP P WEXIT 14:30 - 15:30 1.00 STWHIP P WEXIT 15:30 - 16:00 0.50 STWHIP P WEXIT 16:00 - 00:00 8.00 STWHIP P WEXIT 00:00 - 18:00 18.00 STWHIP P WEXIT 18:00 - 19:00 1,00 STWHIP P WEXIT 19:00 - 19:30 0,50 STWHIP P WEXIT 19:30 - 20:00 0.50 STWHIP P WEXIT 20:00 - 21 :00 1.00 STWHIP P WEXIT 21 :00 - 21 :30 0.50 STWHIP P WEXIT 21 :30 - 22:00 0.50 STWHIP P WEXIT 22:00 - 00:00 2,00 STWHIP P WEXIT 1/312006 00:00 - 01 :30 1.50 STWHIP P WEXIT 01 :30 - 02:00 0,50 STWHIP P WEXIT 02:00 - 04:00 2,00 STWHIP P WEXIT 04:00 - 09:00 5.00 STWHIP P WEXIT 09:00 - 10:30 1.50 STWHIP P WEXIT 10:30 - 11 :30 1.00 STWHIP P WEXIT 11 :30 - 14:00 2,50 DRILL P INT1 14:00 - 14:30 DPRB 14:30 - 19:30 N N DPRB INT1 Start: 12/26/2005 Rig Release: 2/7/2006 Rig Number: Spud Date: 6/4/1975 End: 2/7/2006 of Operations Shallow test MWD and GyroData tools, pump @ 600 gpm @ 700 psi. Slow down top drive. P/U SHA to 168', bumper sub wijl not close, P/U new bumper sub. RIH with BHA, 2/5K drag from 168' to 997', RIH from 997' to 2139', 2/5K intermittent drag to 2115', Work through tight spot @ 2115'. UWT & DWT = 115K. Wash down from 2115' to 2325'. Orient whipstock 80 degrees left, RlU Sperry Sun E-line truck, RIH with gyro for check shot. RID gyro and E-line, Orient whipstock 80 degrees left and set @ 2383'. (Halliburton EZSV was set @ 2370' and slipped down hole to top of 9 5/8" cut off @ 2390',) Displace seawater from well to 8,8 ppg LSND milling fluid, Pump @ 600 gpm @ 760 psi. Mill window in 133/8" 72 # casing from 2350' to 2356'. UWT = 120K, DWT = 120K, RWT = 115K. Pump @ 600 gpm @ 820 psi. RPM = 90 to 100, torque off bottom = 1250, on = 517000. Recovered 180 pounds of metal cuttings, Mill window in 133/8' 72 # casing to 2377'. Pump @ 600 gpm @ 850 psi. RPM = 90, Torque = 15/25K, WOB = 12/26K, Drill 20' of new formation to 2405'. UWT = 120K, DWT = 120K, RWT = 115K. TOW @ 2353', SOW @ 2377', TD of 12.25" hole @ 2387', TD of 11,625' hole @ 2405'. Recovered 950 # of metal cuttings, Pump Super Sweep and ream window clean, CBU X 2 @ 650 gpm. Take gyro 4 point survey. Perform FIT test to 10.8 ppg mud weight. TVD = 2405', Mud weight = 8.8 ppg, Pressure = 250 psi. Pull 1 stand drill pipe, Slip & cut drill line. Service top drive, POH to 965', POH, stand back 6 stands of HWDP, UD 9, 6 1/4" drill collars, Down load MWD. Stand back MWD & gyro tools, UD mills. Full gage, Clear & clean rig floor. Service wear ring. Flush BOP stack & surface equipment. Remove rotary table cover and clean out with super sucker. PJSM. P/U 12 1/4' drilling BHA - 1.83 deg motor, gyro tools, LWD, MWD, Orient. Shallow test. RIH wI BHA. RIH picking up DP from 850' to 2,266'. Install blower hose. SPR's. Orient 80 LHS. Slide thru window, No problems. Drill from 2,405' to 2,552'. topped nlling to va I ate r surveys. Will cross hard on traveling c Ii I surveys are correct. Pull u:J t run Gyro on E-Line perry Sun E-line. Ran eight check shots with Gyro on from 2,333 to 2,429'. GWD surveys were good, MW in 8.8 ppg, g. Slug DP, POOH to check tion. Printed: 211312006 12:00:39 PM 01-08 Sundry e II ç:-- O~, e Subject: 01-08 Sundry From: "Allen, Kenneth W" <Kenneth.Allen@bp.com> Date: Thu, 01 Dec 200517:52:03 -0900 To: Winton Aubert <winton_aubert@admin.state.ak.us> Winton, During a few discussions over here we decided to bring the cement P&A plug slightly higher during the pre-rig work on well 01-08A. I have enclosed a copy of the changes in the Operations summary and also attached new schematics showing the higher P&A plug. Please let me know if you'd like me to submit a new sundry stating this slight change. Thanks for your time, Ken Allen Operations Drilling Engineer Mobile: 907.748.3907 Office: 907.564.4366 e-mail: allenkw(iÙ.bp.com CC' 'lNME"r', ' ¡~.'"'.JJ E.-['... r. ('2[ìrì~ ~ M /'\1 '", I' C _ ) 3.J -08 Pre_Rig.ZIP Content-Description: 01-08 Pre_Rig.ZIP Content-Type: application/x-zip-compressed Content-Encoding: base64 -08 Content-Description: 01-08 Decomplete.ZIP Content-Type: application/x-zip-compressed Content-Encoding: base64 01-08A Proposed Content-Description: 01-08A Proposed Completion.ZIP Content-Type: application/x-zip-compressed Content-Encoding: base64 Content-Description: 01-08A Sundry Application.ZIP 01-08A Sundry Application.ZIP Content-Type: application/x-zip-compressed Content-Encoding: base64 1 of 1 12/2/2005 7:46 AM e e GP~-d . td'år/tr: To: Winton Aubert - AOGCC Date: December 01, 2005 From: Ken Allen - BPXA GPB Rotary Drilling Subject: 01-08 Application for Sundry Approval - P&A for Sidetrack Operations Approval is requested for the proposed P&A of PBUwell 01-08. Well 01-08 is an Ivishak injector that is currently shut-in for tubing by IA communication. The well was secured with a TTP set at 11,465' in May-05. The well bore is providing no injection or value to the field as it currently sits. Well 01-08 was drilled in July 1975 as a Zone 2 producer. The well produced from 1977 - 1985. In 1985, well 1-08 was converted to an Ivishak injection well. Repeated injection profiles showed that the water injection was going only into Zn 3. In Dec-88, the well was squeezed and only reperforated in Zn 4. Although squeezed, injection profiles continued to show that Zn 3 (13,000- 13,030' md) was still taking all the injection. By the middle of 2001 the well was shut-in to stop the out of zone injection. The plan is to exit the parent 01-08 wellbore at -2,350' md. This will require cutting and pulling the 9-5/8" casing just above the top 9-5/8" FO cementer. A whipstock will be run and a 12-1/4" window will be milled in the 13-3/8" casing. A 12-1/4" hole will then be drilled to just above the Ugnu formation at -5,163' and 9-5/8" casing will be run and cemented to surface. A 8-3/4" hole will then be drill to the Top of the Put River formation. A 7" liner will then be run and cemented in 2 stages. A 7" tieback will then be stung into the top of the previous 7" liner top and brought to surface. The 6-1/8" wellbore then builds to horizontal landing just above the base of the Put River. The planned well then runs horizontally for about 300' staying within the Put River formation. A solid 4-1/2" liner will be cemented in place throughout the production interval. The 01-08A sidetrack is currently scheduled for Nabors 2ES beginning around 12/10/05, after completing the Y-11 C sidetrack. The pre-rig work for this sidetrack will be priority scheduled immediately after the Application for Sundry is approved. Changes from version 1.0 are show with Red text. 01-08 Application for Sundry Version 1.1 e e 01-08A Operations Summary Pre-Ria Work: 1. Rig up slickline. Pull PXN plug from TP. Drift 5-1/2" x 4-1/2" tubing through WLEG. Tag and record PBTD below WLEG. 2. Fluid pack the tubing and inner annulus. 3. P&A perfs in 7" liner from the 10' of cement on top of the IBP set at 13,314' MD. RIH with coil to PBTD (-13,314' MD). Lay in 74 bbls of cement to -11,320' MD (Above top of production packer). Wash down to confirm TOC @ 11,320'. POH with coil. a. Cement Calculations: · 7" liner = 13,314' - 11,647' or 1,667' (-62 BBLS) · 9-5/8" casing::: 11,647' - 11,534 or 113' (-8 BBLS) · 4-1/2" tubing::: 11,534' - 11,406' or 128' (-2 BBLS) · 5-1/2" tubing = 11,406' - 11,320' or 86' (-2 BBLS) · Total cement volume of 74 BBLS 4. Rig up slickline, drift 5-1/2". Tag TOC. 5. Jet cut the 5-1/2" tubing at - 2,950' MD. 6. Pressure test T X IA to 3,500 psi for 30 minutes. Pressure test the OA to 2,000 psi for minutes. 7. Circulate the well to sea water through the cut. Freeze protect the IA and tubing with diesel to -2,200'. 8. Bleed OA, fA & TBG to zero. Test the 9-5/8" pack-off to 3,500 psi and tubing hanger seals to 5,000 psi. Function all lock-down screws. Repair or replace as needed. 9. Bleed casing and annulus pressures to zero. Set a BPV in tubing hanger. Secure well. 10. Remove the well house. Level the pad. Please provide total well preparation cost on the handover form. 01-08 Application for Sundry Version 1.1 e e Ria Operations: 1. MIRU Nabors 2ES 2. Pull BPV. Circulate out freeze protection and displace well to seawater. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. Pull TWC. 4. Pull 5-1/2" tubing from the pre~rig cut -2,950'. Spool up SSSV control lines. 5. MU 9-5/8" casing scraper assembly, RIH picking up 5" DP to -2,700' & circulate wellbore. 6. MU a 9-5/8" CIBP on DP & set -2,500'. POOH. 7. C/O to 9-5/8" Rams. 8. MU a Baker 9-5/8" casing cutting assembly. RIH picking up 5" drill pipe to -2,390'md. Cut the 9-5/8" casing per Baker representative instructions. POOH and LID assembly. 9. MU a 9-5/8" casing spear assembly and unseat the casing. Circulate the Arctic Pack from the annulus with warm diesel followed by sea water and detergent sweeps. Pull the 9-5/8" casing from the cut at -2,390'. 10. RU e-line. Run Gauge Ring / Junk basket and Gamma Ray tool for 13-3/8",72# casing with CCL to casing stub - 2,390'. 11. RIH with 13-3/8" EZSV on e-line. Set EZSV at -2,370 to avoid cutting a casing collar during window milling operations. RD e-line. 12. C/O to variable Rams. 13. Close rams and pressure test the 13-3/8" casing and bridge plug to 3,000 psi for 30 minutes. 14. PU 13-3/8" whipstock and bottom trip anchor with a 12-1/4" window milling assembly. BHA will contain a UBHO sub and G/MWD tool for whipstock orientation. RIH on 5" DP to EZSV. Orient and set the whipstock. Swap well over to 8.8 ppg milling fluid. E-line will be utilized to ensure G/MWD tools match up to Gyrodata's e~line Gyro orientation. 15. Mill a window in the 13-3/8" casing at ±2,350' MD plus 20' from mid window. Perform FIT to 10.8 ppg. POOH for Drilling BHA. Note: Verify that the mud weight is 8.8 ppg prior to cutting the window. 16. MU the 12-1/4" drilling assembly with DIR(G/MWD}/GR/RES/PWD and RIH. Kick off and drill 12-1/4" interval to 9-5/8" casing point at the shale interval just before the Top Ugnu 4 (-4,440' ssTVD 1-5,537' MD). Short trip and condition wellbore for 9-5/8" casing. POOH. The G/MWD surveys will be used until clear of magnetic interference. 17. Run a 9-5/8" BTC-M casing throughout the 12-1/4" hole and back into the 13-3/8" casing to surface. Cement will be brought up to surface. 18. MU the 8-3/4" RSS drilling assembly with DIRlGR/RES/PWD and RIH to the landing collar. 19. Pressure test wellbore to 3,500 psi for 30 minutes. 20. Drill shoe track. Ensure good 9.0 ppg mud throughout system and drill 20' of new formation. Perform FIT to 11.5 ppg. 21. Continue drilling 8-314" interval holding inclination -650 to the THRZ Formation at -13,585' MD. Mud weight will be increased to 10.8 ppg before drilling into the THRZ. Drill ahead holding angle until 7" casing point -14,161 '. Short trip and condition hole for 7" liner run. POOH racking back as much 5" drill pipe as possible to limit the amount of time before running 7" liner. 22. Run and cement a 7" drilling liner throughout the 8-3/4" hole and back into the 9-5/8" casing 150' to -5,387' MD. Cement will be pumped in two stages. Set hanger /Iiner top packer and displace cement with mud. POOH laying down the 5" DP. LD all 5" DP from Derrick. 23. RU and run 7" Tie-back liner to surface. Cement will be brought up to -4,537' MD. The top 2,200' of 9-5/8" by 7" annulus will be freeze protected to surface. 24. MU 6-1/8" clean out BHA with used bit. RIH picking up 4" DP to the 7" tieback landing collar. 25. Pressure test wellbore to 4,000 psi for 30 minutes. 26. Drill out 7" tieback float equipment. 27. Continue to RIH picking up 4" DP to the 7" ES cementer. Drill out 7" ES Cementer equipment. 28. Continue to RIH picking up 4" DP to the 7" drilling liner landing collar. 29. Pressure test well bore to 4,000 psi for 30 minutes. 30. Drill out shoe track. Swap over to 8.4ppg FloPro mud. POOH for USIT logging tools. 31. RU e-line. RIH w/USIT to 7" shoe. Log USIT from 7" shoe to -3,000'. POOH RD e-line. 32. MU 6-1/8" BHA with DIRlGRlRES and RIH to the 7" shoe. Drill at least 20' (not more than 50') of formation sliding for build. 01-08 Application for Sundry Version 1.1 e e 33. Perform FIT to 10.3 ppg. 34. Drill the 6-1/8" build interval as per directional plan building to -930 (estimated -14,438' MD). POOH for horizontal assembly. 35. MU 6-1/8" BHA with DIR/GR/RES/NEUlDEN and RIH. Drill horizontal interval to an estimated TD of -14,590' md. Condition well bore for the 4-1/2" solid, cement liner. POOH racking back DP. LD drilling assembly. 36. Run and cement a 4-%" solid production liner extending the liner lap 100' into the drilling liner. Set liner top packer and displace well to clean seawater above the liner top. POOH. Note: A perf pill will be left in the 4-1/2" liner. 37. RIH with DPC perf guns, Perf intervals to be determined from LWD logs. Plan to perforate overbalance. POOH, LD DP and perf guns. 38. Run the 4-1/2", 12.6#, L-80 completion tying into the 4-1/2" liner top. 39. Set packer and individually test the tubing to 4,000 psi and annulus to 4,000 psi for 30 minutes each. 40. Set and test TWC. 41. ND BOPE. NU and test the tree to 5,000 psi. 42. Freeze protect the IA and Tubing to -2,200' and secure the well. 43. RDMO. Post-Ria Work: 1. Install wellhouse and flowlines. New "S" Riser will be manufactured. 2. MIRU slickline. Pull the ball and rod / RHC plug from 'XN' nipple below the new production packer. 3. Install gas lift valves. Estimated Pre-Rig Start: Estimated Spud Date: 11/29/05 12/10/05 Ken Allen Operations Drilling Engineer 907.564.4366 01-08 Application for Sundry Version 1.1 TREE = W B..LHEAD = ACTUATOR = KB, ElEV = BF, ElEV = KOP= Mil)( An It' = DirtumMD= Dirtum TVD = ? FNC AXB..SON 72' -? 01-08 I SAFETY NOTES' SLOW TX IACO_ Pre-Rig 3000' 63 @ 7000' 13095' 8800' SS 2402' & 2628' - 9-5/8" FO Cementers Cement was pumped between FO Cementers 2223' 5,112" OTIS RQM 5S5V NIP. ID = 4.002" 20" CSG. 94#, H,40.ID = 19.124' . 13-318" CSG. 7'2i1. ~-eo. ID = 12:347" , 7 / " -2950' - Jet Cut 5-112" OTIS XA SUDING SLY, ID = 4.562" I I Minimum ID =3.813"@ 11468' 4-112" OTIS X NIPPLE 5-1/2" OTIS XN NIP, ID = 4455" I 5-112" BOT PBR ASSY 11-518" ,'\5-112" EiAKER 5AEi PKR. ID= 4.75" 15.1/2" TBG-NPC.17#, L,ao. .0232 "pf,ID =4,agz' H TOP OF 41/2" lBG-NPC 5-112" X41/2" XO 4112" BOT SHEAROUT SUB 4112" TUBING TAIL I ELIvÐ TT LOGGED 10/22"6 I PERFORA TION SUNMARY REF LOG: BHCS ON 07107f76 A NG LE A T TOP PERF: 52 @ 12776' NotE': Rt'fE'1 to Prllductilln DB fllr historical pE'rf data SIZE 5PF INTffiVAL Opn/Sqz: DA TE 3,318" 6 12776, 12786 S 04,u31S8 3-318" 6 12954- 12964 S O4lU31S8 3- 118" 4 12970 - 12980 S 10/11/84 3,318" 4 13000· 13030 thief zon~ 10/11/84 3-318" 1 13050- 13068 S 10/2718ß 3,318" 1 13(}72, 13092 S 10/2718ß 3·318" 1 13006 - 13116 S 10/2718ß 3,318" 1 13120, '13'140 S 10/2718ß 2-718" 4 13160- 131B5 S 0211 om 7"LNR.29#.MII-80..03T1bpf.ID=e.1134" H 13550' ~ 13550' DAlE 07/22175 09/23/97 02115101 06105103 OB/17103 11129104 IBP W/1Q' CNT ON TOP (08129100) REV BY GOMtoIENTS ORIGINAL COMPLETION LAST WORKOVER TP GORRECTIONS CNOITLP tvl6.XANGLE GNOITLP DATUM t.IÐ CORRECTION DFRITLP 2C" CSG. CORREGT9-518" CSG PRUDHOE BAY UNIT WELL: C1,DS PERMT No: "1750260 API No: 50- (}29- 20 16D- 00 SEC 4. T1(}N. R15E. 1095.37' FB..&369426' FNL DA lE REV BY CONtJENTS 0922,u5 KSB/lLH TTP SET (05105105) BP B<þlcr.;dion (AI,;¡s k,;¡i TREE = W 8..LHEAD = ACTUATOR = KB. ELEV = BF. ELEV = KOP= Mil)( Angle- = DiltumMD= Diltum TVD = ? FMC AX8..S0N 72' ? 3000' 63 @ 7000' 13005' 8800' S S ~ I 20" GSG, 94#, H·40.ID = m124' 01-08 Decomplete 13-318" HES EZSV --2370'- Mechanical Cut - -2390' 2402' & 2628' - 9-5/8" FO Cementers Cement was pumped between FO Cementers FERFORA T10N SUMt.MRY REf" LOG: SHCS ON OìIŒfï5 ANGLE AT TOP PERF: 52 @ 12776' Noæ: Refer to Pr~ductil)n D8 for historical perf data SIZE SPF INTERVAL OpnlSqz DA TE 3-318" 6 12776, 12786 S 04103188 3-318" 6 12954 - 12964 S 04103188 3-118" 4 1297Q - 12980 S 10/11/84 3-318" 4 13000 - 13000 thief zone 10/11/84 3-318" 1 1305J, 13068 S 10/27/86 3-318" 1 13072 - 13DQ2 S 10/27/8ð 3-3/f!' 1 13000 - 13116 S 10/27/86 3-3/f!' 1 13120 - 13140 S 10/27/86 2,7/11' 4 13160 ' 13185 S 02l10nT II In 1m u m ID = 3 .8 1 3 .. G 1 1 4 ç S . 4 -1 /2" 0 T IS X NIP P L E I , 1;:;:· -s c Nr·.:, 1j'; L -: e. ,(: 2: ~ 2 ~.i. I~ - L .;.(,; 2 H 1 14 0 6' ,<> <> ,- I 1(; ., I':: 1 140C¡' 14.1Û.- I :s..:ï-NI·~. 1:l.;4. I 1 U a 4' II ".:t', ..~-!t~ l.I.f,l'; _ ~L;':X I-ç = ç = 7 .N=\ ~ 1 16 47' I ~. ~ 0; t: ~i (: . .. , IP Iv '_I;: n :)c.,,~. . ;1.::;11 1 19 II: á . 1:-I'I.t.)"~,....'-r.:: :::1/1111' ,11;0-;0.. '1."· I 18660' I: 1---1 , :t; 'I'; ò' DATE 07122fiS 09123/97 02 15A:J1 06 05,()3 OS 17A:J3 11 2eA:J4 RBI BY COMIvENTS ORIGINAL': OMPl EI'ION lAST WORKOVER TP CORRECTIONS GMO/TLP MAX. ANGLE CMO/TLP DATUtJIlvO CORRECTION DFRlTLP 20" CSG, CORRECT8-5ta" CSc. DATE REV BY CO IIITv1EN TS 09122105 KS BITLH TIP SET (05105/05) 11/10105 KWA Proþos.d COl'l1'le1ion I SMET'< NOTES, SLOW TX .. CO'" -2500' - 9-5/8" HES CIBP Pull & LD 5-1/2" TBG Set 9-5/8" CIBP Cut & Pull 9-5/8" CSG just above FO CMTR Set 13-3/8" EZSV t' --t ..- P O-I~ X/\ $LI~I":; !:.v, 10 I.~G'· 11320" -Top of Cement P&A Plug 1 Ii 47' - >' ¡. 0-1:: XN ~ IF. I~ - '.1 G:'· I U 6 4' .- ,- ~ ;:, I .~~ A~;::¡' Y 1 U e õ' :0-5 .. ~ t';·11:I " , r I~ ;;A r. :'.(n In .. 1 1404 . ~- . ~ J·1'''' xu 1 148 t· O-I~ X . '''. 10 - J .r, 3 - 0- I!:)I ::11 A h~} I.' ~: .. b 1 Hi 3....' - ,. T... r..1' I? All I 1 1421' H ._~ C I L:J"': W:.U . I.IJ.: 2 It! ~14' IE::~ ·~'·:'C\tT:)N-C"(-:-l2.·~~-:'; PRUDHOE BAY UNIT WELL: 01-0BA PERMIT N D: API ND: 50-029,20160-01 8P E,(ploration (Alas ka) 20" CSG, 94#, H-40, - 100' - 01-08A 1RB::= Wa.LHEAD = AC lUA TOR = KB, ELEV = SF. ELB/= I<OP = M3x A~gl~ = Da1umMD = Da1u m TVD = GAS LlFT~NDRa.S WPE VLV LATCH PORT FMC AXELSON Pro posed Com pletion -2.200' HES 4-1/2" X Nipple 10 = 3.813" ......-------2350· - Top of Whipstock 7". 26#, L-80, BTC,M Tieback 4-112",12.6#, L,80, IBT-M TBG IvÐ TVD DB/ TBD TBD TBD TBD DATE 13-3/8" HES EZSV --2370' Mechanical Cut - -2390' 2402' & 2628' - 9-5/8" FO Cementers CMT between FO Cementers ~ 13-3/8" CSG, 72#, _ -2674' L-80, MN-80 9-5/8" HES CIBP - -2500' Jet Cut - -2950' DATE 07122n5 09123197 0215101 06 05,Q3 0817103 11 2elO4 RBI BY COMtvENTS ORIGINAL C OMPL ElïON LAST WORKOVER TP CORRECì10NS CMOITLP MAA ANGLE CMOITLP DATUM ~¡f) CQRRECTION DFRITLP 20" CSG, CORRECTS,5IS" ':::SG> 5-1/2" TBG-NPC, 17#, L-80 -5537' - 7" Seal assy -5387' - BKR HGR & L TP w/TB slea\Æ! ......------ -5537' - 9-518",40#, L-80, BTC,M /-9685' - BOC &7" HES EZ CMTR / / -12661'-TOC I' / -14,080' HES 4-112" X Nipple 10 = 3.813" / -14,000 BKR 7" x 4-112" BKR PKR -14,020' HES 4-112" X Nipple 10 = 3.813" -14,040' HES 4-112" XN Nipple 10 = 3.725" -14,061' 4-112" WLEG -14061' - BKR HGR & LTPwtrB sleave -14161' - 7",26#. L-80, BTC-M -14490' - PBTO -14590' - 4-112", 12.6#, L-80,IBT-M s ' ~. 0-':5. X^ $LI)I~':: !.\I 10 ~.;ó~.. :t 1320' - Top of Cement P &A Plug ':.-" ~. O-I=: XN \1IF It"' - ! .1(:::· t 18 41' 1&&4' 13 &I' t 1401' t 148 ~-' I. - t: ;,:.. I 'b"\ A :!i ~ y ~_:"ii ... X S_II:' ....A. <rl~ :;Af. :-(I~, In - I 75 ~_. ':. X. 1·1'''' X t1 ~-' :::·0-1::;: x 'IP. I"': - 3.15- .) 1 i -' .. I!~) I :; II A I~ n " ~:.. h 1 1 i -' ~.. T", r: "I? -.....1 11.5Z1' H ~_f,,¡": I L:"t...:::;~L.I ·V,.2 ItS ~ 11960· -9-5/S'CSG, 47#. MN-SO/SOO·95 113 14' IE;' (J'·:·¢\tT;)N-C....~·~.l-::~.;:; IT It<~ ;:$t......,-O::-..:);'71~pl.ln-(i (tt· t--I 18Ei10' _I TO H UI&O' DATE REV BY COWBHS 00122106 KSBlTUi TIP SET(05106105) 11110106 I<WA Proþos ~d COl'r'4'letion PRUDHOE BAY UNIT WELL: 01,08A PERMIT No: API No: 5O,02Q·20160,(}1 BP E-<ploration (Alas ka) e e ~ 1r ~ ü Œ [ID ~ ~ ~ 1% ~ æ ~ / FRANK H. MURKOWSK~ GOVERNOR AI,ASIiA. OIL AlÐ) GAS / CONSERVATION COMMISSION I , J 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501,3539 PHONE (907) 279-1433 F~ (907)276-7542 Dave Wesley Senior Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: PBU 01-08 Sundry Number: 305-363 ~ANNS[; DEC 1 4 2005 Dear Mr. Wesley: Enclosed is the approved Application for Sundry Approval relating to the above referenced weiL Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, t~/~ Cathy P. Foerster Commissioner DATED this~ay of November, 2005 Encl. C(II II- ¡3-J~ e STATE OF ALASKA e ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25"280 Alllka Oil & Gas Cons. Commission \;JG/~ ìf/l~1 ¿ DC ~- RECEIVED NOV 2 2 2005 1. Type of Request: II Abandon o Suspend o Operation Shutdown o Perforate o Other ~------- o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Time Extension 2. Operator Name: 4. Current we~í~: 5. Permit To ÐrI\I Number BP Exploration (Alaska) Inc. ...a-oevelop~ent Iü{xPloratOry 175-026 /' 3. Address: D Stratigraphic Service 6. API Number: /' P.O, Box 196612, Anchorage, Alaska 99519-6612 50- 029-20160-00-00 7. KB Elevation (ft): 72' 9. Well Name and Number: PBU 01-08 / 8. Property Designation: 10. Field I Pool(s): ADL 028328 Prudhoe Bay Field I Prudhoe Bay Pool 11, , PAESENTWELL CONDITIONiSUMMARY : .: :< ::,:" Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13550 9139 13314 9003 11468 None Casing Length Size MD TVD Burst CoUaDse Strll~turA I 100' 20" 100' 100' 1530 520 SllrfA~e 2674' 13-3/8" 2674' 2674' 4930 2670 11960' 9-5/8" 11960' 8188' 6870 4760 Liner 1903' 7" 11647' - 13550' 8809' - 9139' 8160 7020 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: I Tubing MD (ft): None (Squeezed) None 5-112", 17# x 4,1/2", 12,6# L-80 I MN-80 11534' Packers and SSSV Type: 9-5/8" x 5-1/2" Baker 'SAB' packer Packers and SSSV MD (ft): 11395' 12. Attachments: 13. Well Class after proposed work: wilA- IS! Description Summary of Proposal D BOP Sketch D Exploratory -ØJ-O'evelopment ~ervice D Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: December 10, 2005 DOil DGas D Plugged IS! Abandoned 16. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ken Allen, 564-4366 Printed Name Dav~esley / /~ Title Senior Drilling Engineer -,' Æ(/( /Æ /... ¿I»+--- Date/~~:) Prepared £Iy Nam9INumber. Sianature V{/,,· .r Phone 564-5153 Terrie Hubble, 564-4628 C/(/ Comml$slon Use Only I '-# - "1r.? Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ,rrn - , ALA- '} " - . D Plug Integrity IiÍBOP Test D Mechanical Integrity Test D Location Clearancl Tfc,," ' ", -- i·v 1 c- ()," 'j,' {t. Þ ..J 1/ ç Other: I~r p J V ¡f {' d \ i~ ~Jf yv"- IV - 40 { J lRþ (.' f,uf, { , t.:'l-ork, ~".( ¿, (LA. .v ~l" " / . ,"'. ~L íI Subsequent Form Required: iD 4°7. Approved By: ~ ~ .(/~ APPROVED BY ./ COMMISSIONER THE COMMISSION Date 11- l. 3 "'f'J <; Form 10-403 RevisEJd 07/2f(15 , . ~1'Wl> æ5 no1/ Submit In Duplicate OR\G\\~AL N e e To: Winton Aubert - AOGCC Date: November 21, 2005 From: Ken Allen - BPXA GPB Rotary Drilling Subject: 01-08 Application for Sundry Approval - P&A for Sidetrack Operations Approval is requested for the proposed P&A of PBU well 01-08. Well 01-08 is an Ivishak i a /' that is currently shut-in for tubing by IA communication, The well was secured with a TTP~~ 11 ,465' in May-OS, The wellbore is providing no injection or value to the field as it currently sits. Well 01-08 was drilled in July 1975 as a Zone 2 producer. The well produced from 1977 - 1985. In 1985, well 1-08 was converted to an Ivishak injection well, Repeated injection profiles showed that the water injection was going only into Zn 3. In Dec-88, the well was squeezed and only reperforated in Zn 4, Although squeezed, injection profiles continued to show that Zn 3 (13,000 - 13,030' md) was still taking all the injection. By the middle of 2001 the well was shut-in to stop the out of zone injection. The plan is to exit the parent 01-08 wellbore at -2,350' md, This will require cutting and pulling the 9-5/8" casing just above the top 9-5/8" FO cementer. A whipstock will be run and a 12-1/4" window will be milled in the 13-3/8" casing. A 12-114" hole will then be drilled to just above the Ugnu formation at -5,163' and 9-5/8" casing will be run and cemented to surface. A 8-3/4" hole will then be drill to the Top of the Put River formation. A 7" liner will then be run and cemented in 2 stages, A 7" tieback will then be stung into the top of the previous 7" liner top and brought to surface, The 6-1/8" well bore then builds to horizontal landing just above the base of the Put River, The planned well then runs horizontally for about 300' staying within the Put River formation. A solid 4-1/2" liner will be cemented in place throughout the production interval. The 01-08A sidetrack is currently scheduled for Nabors 2ES beginning around 12/10/05, after completing the Y-11 C sidetrack. The pre-rig work for this sidetrack will be priority scheduled immediately after the Application for Sundry is approved, 01-08 Application for Sundry e e 01-08A Operations Summary Pre-Ria Work: 1. Rig up slickline. Pull PXN plug from TP. Drift 5-1/2" x 4-1/2" tubing through WLEG. Tag and record PBTD below WLEG. 2. Fluid pack the tubing and inner annulus, 3. P&A perfs in 7" liner from the 10' of cement on top of the IBP set at 13,314' MD. RIH with coil to PBTD (-13,314' MD). Lay in 62 bbls of cement to -11,647' MD (7" Liner Top), Wash down to confirm TOC @ 11,647'. POH with coil. a. Cement Calculations: · 7" liner = 13,314' - 11 '62' 1,667' (-62 BBLS) --- . Total cement volume of. BLS 4. Rig up slickline, drift 5-1/2" x 4-1/2" t . g. Tag TOC. 5. Jet cut the 5-1/2" tubing at - 2,950' MD. ,/' 6, Pressure test T X IA to 3,500 psi for 30 minutes. Pressure test the OA to 2,000 psi for minutes. 7. Circulate the well to sea water through the cut. Freeze protect the IA and tubing with diesel to -2,200'. 8. Bleed OA, fA & TBG to zero. Test the 9-5/8" pack-off to 3,500 psi and tubing hanger seals to 5,000 psi. Function all lock-down screws. Repair or replace as needed. 9. Bleed casing and annulus pressures to zero, Set a BPV in tubing hanger. Secure well. 10. Remove the well house, Level the pad, Please provide total well preparation cost on the handover form, Ttv1. L, I Q-l, ,/ S :~f ¡nv '-It"l. Ria Operations: 1. MIRU Nabors 2ES 2, Pull BPV, Circulate out freeze protection and displace well to seawater, Set TWC. 3. Nipple down tree. Nipple up and test BOPE. Pull TWC. 4, Pull 5-1/2" tubing from the pre-rig Jet cut -2,950'. Spool up SSSV control lines. 5, MU a 9-5/8" CIBP on DP & set -2,500'. POOH. /' 6. C/O to 9-5/8" Rams, 7. MU a Baker 9-5/8" casing cutting assembly, RIH picking up 5" drill pipe to -2,390'md. Cut the 9-5/8" casing per Baker representative instructions. POOH and UD assembly. 8. MU a 9-5/8" casing spear assembly and unseat the casing. Circulate the Arctic Pack from the annulus with warm diesel followed by sea water and detergent sweeps. Pull the 9-5/8" casing from the cut at -2,390'. 9. RU e-line. Run Gauge Ring / Junk basket and Gamma Ray tool for 13-3/8", 72# casing with CCL to casing stub - 2,390'. 10. RIH with 13-3/8" EZSV on e-line, Set EZSV at -2,370 to avoid cutting a casing collar during /' window milling operations. RD e-line, 11, C/O to variable Rams. 12. Close rams and pressure test the 13-3/8" casing and bridge plug to 3,000 psi for 30 minutes. 3, 13-3 8' whipstock and bottom trip anchor with a 12-1/4" window milling assembly. BHA will contain a UBHO sub and G/MWD tool for whipstock orientation. RIH on 5" DP to EZSV. Orient and set the whipstock. Swap well over to 8.8 ppg milling fluid. E-line will be utilized to ensure G/MWD tools match up to Gyrodata's e-line Gyro orientation. 14. Mill a window in the 13-3/8" casing at ±2,350' MD plus 20' from mid window, Perform FIT to 10.3 ppg. POOH for Drilling BHA. Note: Verify that the mud weight is 8.8 ppg prior to cutting the window. 15. MU the 12-1/4" drilling assembly with DIR(G/MWD)/GR/RES/PWD and RIH. Kick off and drill 12-1/4" interval to 9-5/8" casing point at the shale interval just before the Top Ugnu 4 (-4,440' ssTVD / -5,163' MD). Short trip and condition wellbore for 9-5/8" casing. POOH. The G/MWD surveys will be used until clear of magnetic interference, 16. Run a 9-5/8" BTC-M casing throughout the 12-1/4" hole and back into the 13-3/8" casing to surface. Cement will be brought up to surface, 01-0S Application for Sundry e e 17. MU the 8-3/4" RSS drilling assembly with DIR/GR/RES/PWD and RIH to the landing collar, 18, Pressure test wellbore to 3500 psi for 30 minutes. 19. Drill shoe track. Ensure good 9.0 ppg mud throughout system and drill 20' of new formation, Perform FIT to 11.5 ppg. 20. Continue drilling 8-3/4" interval holding inclination _650 to the THRZ Formation at -13,583' MD. Mud weight will be increased to 10,8 ppg before drilling into the THRZ, Drill ahead holding angle until 7" casing point -14,287'. Short trip and condition hole for 7" liner run, POOH racking back as much 5" drill pipe as possible to limit the amount of time before running 7" liner, 21, Run and cement a 7" drilling liner throughout the 8-314" hole and back into the 9-5/8" casing 150' to -5,013' MD, Cement will be pumped in two stages. Set hanger /Iiner top packer and displace cement with mud. POOH laying down the 5" DP, LD all 5" DP from Derrick. 22. RU and run 7" Tie-back liner to surface. Cement will be brought up to -4,013' MD. The top 2,200' of 9-5/8" by 7" annulus will be freeze protected to surface. 23. MU 6-1/8" clean out BHA with used bit. RIH picking up 4" DP to the 7" tieback landing collar. 24, Pressure test wellbore to 4,000 psi for 30 minutes. 25. Drill out 7" tieback float equipment. 26. Continue to RIH picking up 4" DP to the 7" ES cementer, Drill out 7" ES Cementer equipment. 27. Continue to RIH picking up 4" DP to the 7" drilling liner landing collar. 28. Pressure test wellbore to 4,000 psi for 30 minutes. ,./ 29. Drill out shoe track. Swap over to 8.4ppg FloPro mud. POOH for US IT logging tools, 30. RU e-line. RIH w/USIT to 7" shoe. Log USIT from 7" shoe to -3,000'. POOH RD e-line. 31. MU 6-1/8" BHA with DIR/GR/RES and RIH to the 7" shoe. Drill at least 20' (not more than 50') of formation sliding for build. 32. Perform FIT to 10.2 ppg. 33. Drill the 6-1/8" build interval as per directional plan building to _930 (estimated -14,438' MD). POOH for horizontal assembly. 34, MU 6-1/8" BHA with DIR/GR/RES/NEU/DEN and RIH. Drill horizontal interval to an estimated TD of -14,716' md, Condition well bore for the 4-1/2" solid, cement liner. POOH racking back DP. LD drilling assembly, 35. Run and cement a 4- W' solid production liner extending the liner lap 100' into the drilling liner. Set liner top packer and displace well to clean seawater above the liner top. POOH. Note: A perf pill will be left in the 4-1/2" liner, 36. RIH with DPC perf guns, Perf intervals to be determined from LWD logs. Plan to perforate overbalance, POOH, LD DP and perf guns. 37. Run the 4-1/2",12.6#, L-80 completion tying into the 4-1/2" liner top. 38. Set packer and individually test the tubing to 4,000 psi and annulus to 4,000 psi for 30 minutes each. 39. Set and test TWC. 40. ND BOPE. NU and test the tree to 5,000 psi. 41. Freeze protect the IA and Tubing to -2,200' and secure the well. 42, RDMO. Post-Ria Work: 1. Install well house and flowlines. New "S" Riser will be manufactured. 2. MIRU slickline. Pull the ball and rod / RHC plug from 'XN' nipple below the new production packer. 3. Install gas lift valves. Estimated Pre-Rig Start: Estimated Spud Date: 11/29/05 12/10/05 Ken Allen Operations Drilling Engineer 907.564.4366 01-0S Application for Sundry TREE = ? WB..LHEAD = FMC e ACTUA TOR = AXB..SON KB. B..EV = 72' BF B..EV = ? KOP = 3000' :~~~~== 63~;~~~: ~ DatumTVD= 8800' SS 20" CSG, 94#, H-40, 10 = 19.124" I 100' 01-08 . I SAÆlYNOTES, SLOW TX IACOMM Current 13-3/8" CSG, 72#, MN-80, 10 = 12.347" . 2223' -i 5-1/2" OTIS RQM SSSV NIP, 10 = 4,562" 2402' & 2628' - 9-5/8" FO Cementers Cement was pumped between FO Cementers Minimum ID = 3.813" @ 11468' 4-1/2" OTIS X NIPPLE I I 11310' 11347' 11354' 11395' 15-1/2" TBG-NPC, 17#, L-80, .0232 bpf, 10 = 4,892" H TOPOF 4-1/2" TBG-NPC H 11406' 11406' 4-1/2" TBG-NPC, 12.6#, MN-80, .0152 bpf, 10 = 3.958" TOPOF 7" LNR I 11534' 19-5/8" CSG, 47#, MN-80/S00-95, 10 = 8.681" I PERFORA TION SUMMARY REF LOG: BHCS ON 07/07/75 ANGLE AT TOP PERF: 52 @ 12776' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12776 - 12786 S 04/03/88 3-3/8" 6 12954 - 12964 S 04/03/88 3-1/8" 4 12970 - 12980 S 10/11/84 3-3/8" 4 13000 - 13030 thief zone 10/11/84 3-3/8" 1 13050 - 13068 S 10/27/86 3-3/8" 1 13072 - 13092 S 10/27/86 3-3/8" 1 13096 - 13116 S 10/27/86 3-3/8" 1 13120 - 13140 S 10/27/86 2-7/8" 4 13160 - 13185 S 02/10/77 5-1/2" OTIS XA SLIDING SLV, 10 = 4.562" 5-1/2" OTIS XN NIP, 10 = 4.455" I 5-1/2" BOTPBRASSY I 9-5/8" X 5-1/2" BAKER SAB A<R, 10 = 4,75" 5-1/2" X 4-1/2" XO I 4-1/2" OTIS X NIP, 10 = 3.813" 4-1/2" PXN TIP (05/05/05) 4-1/2" BOT SHEA ROUT SUB I 4-1/2" TUBING TAIL I B..MD TT LOGGED 10/22/76 13314' -i IBP W/10' CMT ON TOP (08/29/90) I 17" LNR, 29#, MN-80, .0371bpf, 10 = 6,184" H 13550' TO H 13550' DATE 07/22/75 09/23/97 02/15/01 06/05/03 08/17/03 11/29/04 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVER TP CORRECTIONS CMOffiP MAX ANGLE CMOffiP DATUM MD CORRECTION DFRlTLP 20" CSG, CORRECT 9-5/8" CSG DA TE REV BY COMMENTS 09/22/05 KSB/TLH TIP SET (05/05/05) PRUDHOE BA Y UNIT WB..L: 01-08 PERMIT No: '1750260 API No: 50-029-20160-00 SEC 4, T10N, R15E, 1095,37' FB.. & 3694.26' FNL BP Exploration (Alaska) DA TE REV BY COMMENTS 09/22/05 KSB/TLH TIP SET (05/05/05) TREE = ? WB..LHEAD = FMC tit ACTUA TOR = AXB..SON . KB. B..EV = 72' BF, B..EV = ? KOP = 3000' :~~~~e: 63@1~~~~: ~ Datum NO = 8800' SS 20" CSG. 94#, H-40, 10 = 19.124" I 100' 13-3/8" CSG. 72#, MN-80, 10= 12.347" I Minimum ID = 3.813" @ 11468' 4-1/2" OTIS X NIPPLE 15-112" TBG-NPC. 17#, L-80, .0232 bpf, 10 = 4,892" H I TOP OF 4-1/2" TBG-NPC I 4-1/2" TBG-NPC, 12,6#, -1 MN-80, .0152 bpf, 10 = 3.958" I TOP OF 7" LNR I 11647' 19-5/8" CSG, 47#, MN-80/S00-95, 10 = 8.681" 1~1960' PERFORA TION SUMMARY REF LOG: BHCS ON 07/07/75 ANGLEAT TOP PERF: 52 @ 12776' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DA TE 3-3/8" 6 12776 - 12786 S 04/03/88 3-3/8" 6 12954 - 12964 S 04/03/88 3-1/8" 4 12970 - 12980 S 10/11/84 3-3/8" 4 13000 - 13030 thief zone 10/11/84 3-3/8" 1 13050 - 13068 S 10/27/86 3-3/8" 1 13072 - 13092 S 10/27/86 3-3/8" 1 13096 - 13116 S 10/27/86 3-3/8" 1 13120 - 13140 S 10/27/86 2-718" 4 13160 - 13185 S 02/10/77 I 7" LNR, 29#, MN-80, .0371 bpf, 10 = 6,184" H TO H 13550' 13550' DATE 07/22/75 09/23/97 02/15/01 06/05/03 08/17/03 11/29/04 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVER TP CORRECTIONS CMO/TLP MAX ANGLE CMO/TLP DATUM MD CORRECTION DFRlTLP 20" CSG, CORRECT 9-5/8" CSG 01-08 . I SAfETY NOTES, SLOW T X IA COMM Pre-Rig . 2402' & 2628' - 9-5/8" FO Cementers Cement was pumped between FO Cementers 2223' -i 5-1/2" OTIS ROM SSSV NIP, 10 = 4,562" I , '/ " " -2950' - Jet Cut 5-112" OTIS XA SLIDING SLV, 10 = 4.562" 5-1/2" OTIS XN NIP, 10 = 4.45S" I 5-1/2" BOT PBR A SSY 9-S/8" X S-1/2" BAKER SAB PKR, 10 = 4.7S" 5-1/2" X 4-1/2" XO I 4-1/2" OTIS X NIP, 10 = 3.813" I 11531' 4-1/2" BOT SHEA ROUT SUB 11534' 4-1/2" TUBING TAIL I 11521' B..MDTTLOGGED10/22/76 ~11647' - Top of Cemenf P&A Plug -1 IBPW/10'CMTONTOP(08/29/90) I PRUDHOE BA Y UNrr WB..L: 01-08 PERMrr No: '1750260 API No: 50-029-20160-00 SEC 4, nON, R15E, 1095.37' Fa. & 3694.26' FNL BP Exploration (Alaska) 15,112' TBG·NPC, 17#, L,80, .0232 bpi, ID = 4.892" ITOP OF 4,1/2" TBG,NPC 4_1f2ft TBG-NPC, 12.6#, M N, 80, .01 52 bpi, ID = 3.958' ITOPOF7"LNR 19,5/8" CSG, 47#, MN,801S00,95, ID = 8.681" TREE = WELLHEA-D = ACTUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = ? FMC AXELSON 72' ? 3000' 63 @ 7600' 1309S' 8800'SS 01-08 e e SAFETY NOTES: SLOW T X IA COMM Decomplete rod 20" CSG. 94#, H-40. 10 = 19.124" / 13-3/8" HES EZSV - -2370' - Mechanical Cut - -2390' - 2402' & 2628' - 9-5/8" FO Cementers Cement was pumped between FO Cementers /' -2500' - 9-5/8" HES CIBP PERFORA TION SUMtvlARY REF LOG: BHCS ON 07/07/7S ANGLEAT TOP PERF: S2 @ 12776' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12776 - 12786 S 04/03/88 3-3/8" 6 129S4 - 12964 S 04/03/88 3-1/8" 4 12970 -12980 S 10/11/84 3-3/8" 4 13000 - 13030 thief zone 10/11/84 3-3/8" 1 130S0 - 13068 S 10/27/86 3-3/8" 1 13072 - 13092 S 10/27/86 3-3/8" 1 13096-13116 S 10/27/86 3-3/8" 1 13120 - 13140 S 10/27/86 2-7/8" 4 13160 - 1318S S 02/10/77 Pull & LD 5-1/2" TBG Set 9-5/8" CIBP Cut & Pull 9-5/8" CSG just above FO CMTR Set 13-3/8" EZSV M in im u m ID = 3.813" @ 11468' 4 ·1/2" 0 T IS X N IP P L E 1 13 11347 . 11354 ' 113 9 5' 1 406' 468' --I 5 . 1 12" 0 T IS X A SLID IN G S LV, ID = 4.5 6 2 " --I 5 ' 1 /2" 0 T IS X N N IP, ID = 4.4 5 5" I --I 5·112"BOTPBRASSY I 1--1 9-5/8" x 5-1/2" BA KER SA B PKR, ID = 4.75" --I 5,112' X 4·112' XO I --I 4·112" 0 T IS X NIP, ID = 3.81 3' I 1--1 I --I 11 406' 11406' 11534' 4-1/2~ BOT SHEA ROUT SUB 4,112" TUB IN G TAIL I ELMD TT LOGGED 10/22/76 I=: 1-1 1 1 31' 11534 ' 11647' 11 960' 314' --I IBP W110' CMT ON TOP (08/29/90) 17" LNR, 29#, MN,80, .0371 bpi, ID = 6.184" 1--1 13550' TD 1--1 13550' DATE 07/22/75 09/23/97 02/1S/01 06/0S/03 08/17/03 11/29/04 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVER TP CORRECTIONS CMOITLP tvlAX ANGLE CMOITLP DATUM MD CORRECTION DFRlTLP 20" CSG, CORRECT 9-S/8" CSG DA TE REV BY COMMENTS 09/22/0S KSBITLH TIP SET (OS/OS/OS) 11/10/0S KWA A'oposed Corrpletion PRUDHOE BA Y UNIT WELL: 01-08A PERMIT No: API No: SO-029-20160-01 BP Exploration (Alaska) tJ1-08A Proposed Completion e TREE = W8..LHEAD = ACTUATOR = KB. 8..EV = BF 8..EV = KOP- Max Angle - Datum MD = Datum lV D = GAS LIFT MANDRB..S TYÆ VLV LATCH PORT FMC AX8..S0N 20" CSG, 94#, H-40, -100' - -2,200' HES 4-1/2" X Nipple ID = 3.813" ~ -2350' - Top of Whipstock 7", 26#, L-80, BTC-M Tieback 4-1/2", 12.6#, L-80, IBT-M TBG MD lVD DEV TBD TBD TBD TBD DATE 5-1/2" TBG-NPC, 17#, L-80 -4013' - TOe -5013' - 7" Seal assy ~ -5013' - BKR HGR & L TP wITB sleave ~ -5163' - 9-5/8", 40#, L-80, BTC-M -10025' - BOC / -12787' - TOC / / -14,100' HES 4-1/2" X Nipple ID = 3,813" / -14,120 BKR 7" x 4-1/2" BKR PKR -14,140' HES 4-1/2" X Nipple ID = 3.813" .~ -14,160' HES 4-1/2" XN Nipple ID = 3.725" -14,187' 4-1/2" WLEG ~ -14187' - BKR HGR & LTP wITB sleave . .....~ -14287' -7", 26#, L-80, BTC-M 13-3/8" HES EZSV - -2370' Mechanical Cut - -2390' 2402' & 2628' - 9-5/8" FO Cementers CMT between FO Cementers ~ 13-3/8" CSG, 72#, _ -2674' L-80, MN-80 9-5/8" HES CIBP - -2500' Jet Cut - -2950' .111 · -14617 - PST: ij -14717' - 4-1/2",12,6#, L-80, IBT-M 1131 . 11347' 11354' 113 114 6' 11468' -I 5, 1 /2' 0 T IS X A S L 10 IN G S LV, ID = 4.5 6 2 ' -I 5,1/2' 0 T IS X N N IP, ID = 4.4 5 5' 1 -I 5-1/2' BOT PBR ASSY I -I 9,5/8" X 5,1/2" BA KER SA B PKR, ID = 4.75' -I 5-1 /2" X 4,1/2' X 0 1 -I 4,1 /2' 0 T IS X N IP, ID = 3.8 1 3' I 11531' -I 4-1/2"BOTSHEAROUTSUB 5 3 4 ' -I 4 ' 1 /2' TUB IN G TAIL I I 11521' 1-1 ELMD TT LOGGED 10/22/76 ~"647. - Top 0< Cemen' P&A POug 11960',9,5/8" CSG, 47#, MN,80/SQQ,95 13314' -I IBP W/10'CMT ON TOP (08/29/90) 17" LNR, 29#, MN-80, .0371bpf, ID = 6.184" 1-1 13550' __I TD 1-1 13550' DATE 07/22/75 09/23/97 02/15/01 06/05/03 08/17/03 11/29/04 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVER TP CORRECTIONS CMOITLP MAX ANGLE CMOITLP DATUM MD CORRECTION DFRlTLP 20" CSG, CORRECT 9-5/8" CSG DATE REV BY COMMENTS 09/22/05 KSBITLH TIP SET (05/05/05) 11/10/05 KWA Proposed Coll1>letion PRUDHOE BA Y UNIT W8..L: 01-08A ÆRMIT No: API No: 50-029-20160-01 BP Exploration (Alaska) BP Exploration (Alaska) Inc. Post Office Box 196612 PRB-24 Anchorage, Alaska 99519-6612 bp March 6, 2003 Mr. Tom Maunder, P.E. Alaska Oil & Gas Conservation Commission 333 W. 7th Ave. Anchorage, Alaska 99501 Subject: 01-08 (PTD 1750260) Application for Sundry Cancellation Dear Mr. Maunder: Attached is the Application for Sundry Cancellation form 10-404 for well 01-08. This request is for approval to cancel the existing Sundry for this long term shut in well. A description summary of proposal and wellbore schematic is included. If you require any additional information or clarification, please contact either John Cubbon or me at (907) 659-5102. Sincerely, Joe Anders, P.E. Well Integrity Engineer Attachments SCANNED MAR STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ CANCEL 10-403 Pull tUbing _ Alter casing _ Repair well _ Perforate _ Other_X CANCEL t0-403 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage AK 99519-6612 4. Location of well at surface 1078' FNL, 3762' FEL, Sec. 08, T10N, R15E, UM At top of productive interval 3764' FNL, 1800' FEL, Sec. 04, T10N, R15E, UM At effective depth 3707' FNL, 1298' FEL, Sec. 04, T10N, R15E, UM At total depth 3697' FNL, 1097' FEL, Sec. 04, T10N, R15E, UM ' ~2. Present well condition summary 5. Type of Well: Development __ Exploratory__ Stratigraphic__ Service._X (asp's 698859, 5939849) (asp's 706022, 5942636) (asp's 706522, 5942707) (asp's 706722, 5942722) 6. Datum elevation (DF or KB feet) RKB 72 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 01-08 9. Permit number / approval number 175-026 / 300-198 10. APl number 50-029-20160-00 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 100' Surface 2642' Intermediate 11928' Liner 1903' 13550 feet Plugs (measured) 9139 feet 13305 feet Junk (measured) 8997 feet Tagged PBTD @ 13305' (03/16/1998) IBP @ 13314' with 10' CMT on top of it. Size Cemented Measured Depth True Vertical Depth 20" 132' 132' 13-3/8" 6400 sx PF II 2674' 2764' 9-5/8" 1500 sx Class 'G' 11960' 8188' 7" 700 sx Class 'G' 11647' - 13550' 8009'- 9139' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 13. Stimulation or cement squeeze summary Sqzd Perfs 12776'-12786', 12954'-12964', 12970'-12980', 13000'-13030', 13050'-13068', Sqzd Perfs (continued) 13072'-13092', 13096'-13116', 13120'-13140', 13160'-13185' Sqzd Perfs 8680'-8686', 8787'-8793', 8797'-8803', 8815'-8833', 8845'-8856', Sqzd Perfs (continued) 8858'-8870', 8873'-8885', 8887'-8899', 8911'-8926' 5-1/2", 17# L-80 TBG-NPC @ 11406'; 5-1/2" x 4-1/2" XO @ 11406'; 4-1/2" 12.6~ L-80 TBG-NPC @ 11534'. ~*~ !'~'~ ~ ~ ~:'~ ~ I~ 9-5/8" x 5-1/2" Baker SAB Packer @ 11395'. ~'% '~'' ! '~ ~!~ - 5-1/2" Otis RQM SSSV Nipple @ 2223' MD. !' !7 ?00,3 Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation SHUT-IN Subsequent to operation SHUT-IN OiI-Bbl Representative Daily Averaqe Production or Iniection Data Gas-Mcf Water-Bbl Casing Pressure Tubing pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 6. Status of well classification as: Oil w Gas ~ Suspended Service WATER INJECTOR 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~'~ ~ Title: Well Integrity Engineer Welll/nte~ri~En~ineer ~(;~_~.~,,~N~::D~ MAE n ? 2003 Form 10-404 Rev 06/15/88 Questions? Call Well Integrity Engineer 659-5102 Date: Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE 01-08 Sundry Cancellation Request 03~04~03 PTD# 1750260 Sundry~ 300-198 dated 08/15/00 This is a request to cancel the AOGCC SUndry dated 08/15/00. Upon cancellation, the well will remain shut in until the well is repaired or a new Sundry has been approved by the AOGCC. The well will no longer be included in the monthly AOGCC injector report. Reason for cancellation: This well is a Long Term Shut In (LTSI) well. There are no current plans to return the well to injection. SCANNED ~AR 0 ? 2003 TREE = '?. AIN ELLHEAD =C %IATOR = AXELsFMCoN 0108' ISAFEFY NOT ES: SL OW TXIA c DM M KB. ELL=J = KOF= 3000' MaxAn~ll,-- 83e8100' t 222~* I--~ 5-1/2" OTISRQM$SSV NIP. ID =4.E~]2" I Datum MI) = 12058' DatumTVD= 85[Z)' SS i --~ { 11310' ~-~ ~I/2"OTI=SXASUDINOSLV, ID=4.6~2"I ~ S-------~ 11395' H g-5~I"XS-t/2"BAKERSABPKE, ID=4.75" PERFORATION SU IvNARY REF LOG: BHC$ ON B7/DT/75 ANGLEATTOP I~RF: 52 ~ 12778 Note: R~fef to Production DBfor historical parr data =SEE SPF HTERVA L Op./~ClZ DA3E I I ~ 3/a" 6 12776 - t27B6 S 04f03/88 3-3/~' 6 12~154- 129i~4 $ ~3/I~' 4 13000- 13030 thiefz~ne! 1D/11/~4 ($ETOg/ZD/gD) :~3/~' I 13050- 13Q08 $ 1D/27/8~ 3- 3/E~' I 13Q72- 13Q92 S I D/27/86 3-3/E~' 1 13Q{;}6 - 13116 S 1D/27/86 F DATE REV BY (;OMvlENTS DA'IN REV BY COMIvENTS PRUDHOEBAY UNIT 07/22/75 ORlelNAL COI~PLETION WELL: 01-08 09/23/97 LAST WORKOVER PERMIT No: 175026D 11/t0/00 SIS-LG CONVERTED TO CANVAS AR N~: 50-D2~-':'n160-OO Q2/(]7/0t SI=S-IvD REVISION SEC 4, TIGN, Rt§E, t01~.37 FEL 3~94..2~ FNL Q2/t5/~1 TP CORRECTIONS BP Exploration {Alas PERFORATION SUltRY REF LOG: BHOS ON 07/D7/'/5 ANGLEATTOP PERF: 52 ~ 12778 Note: R~f&fto Pr=duatian DBfar histari=al perf data =SIZE SPF NTERVAL Op,/~qz DA3E ~ 3/a" 6 12776 - 127B6 S 04fo3/ee 3.3/~' e 12~154- 129i~4 $ 3-1/8" 4 12870 - 129B0 $ 1Dill/84 3-3/I~' 4 13000- 13030 thiefz~n~ 11)/11/84 3-3/8" I 13050- 13068 $ 1D/27/80 3-3/8" 1 13072- 13092 S I D/27/86 3-3/D' I 13086- 13116 S 1 D/27/86 ~3/B' 1 13120- 1314(I S 2- 7/i~' 4 t3t60- 13tB5 S 02/10/77 $¢. RNNED MAR 0 7 2003 BP Exploration Alaska Inc. Post Office Box 196612 PRB-24 Anchorage, Alaska 99519-6612 bp July 27, 2000 Mr. Tom Maunder Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Subject: DS 01-08 (PTD 175-026) Sundry Notice Variance Request Dear Mr. Maunder: Attached is an Application for Sundry Approval form 10-403 variance request for well 01-08 (PTD 175-026). The request is for approval to continue produced water injection with known production casing communication. Also attached is a proposed Action Plan and a wellbore schematic. If you require any additional information or clarification, please feel free to contact either Joe Anders or me at (907) 659-5102. Sincerely, Jerry Dethlefs Problem Well Specialist Attachments STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon_ susPend_ Operational shutdown _ Re-enter susper~ed Well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program Pull tubing Variance X Perforate _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska),, Inc. Development__ RKB 72 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service x Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1076' FNL, 3761' FEL, Sec. 8, T10N, R15E, UM (asp's 698859, 5939849) 01-08i At top of productive interval 9. Permit number / approval number 3764' FNL, 1800' FEL, SEC. 4, T10N, R15E, UM (asp's 706o20, 5942636) 175-026 At effective depth 10. APl number 50-029-20160 At total depth 11. Field / Pool 3694' FNL, 1095' FEL, Sec. 4, T10N, R15E, UM (asp's 706722, 5942722) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 13550 feet Plugs (measured) Tagged PBTD @ 13305' on 3/16/1998. true vertical 9139 feet IBP @ 13314' w~ 10' of cement on top of it Effective depth: measured 13305 feet Junk (measured) true vertical 8997 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 100' 20" 100' 100' Surface 2602' 13-3/8" 6400 Sx PF II 2674' 2764' Production 11888' 9-5/8" 1so0 Sx Class a 11960' 8188' Liner 1903' 7" 700 Sx Class G 13550' 9139' ORIGINAL ~ ¢, ~. ,,,~ Perforation depth: measured all perfs have been squeezed but well takes injection. ~. -~ ~ ....... %,,~ !~ ",I '"' " true vertical all perfs have been squeezed but well takes injection. UL,",._ 0 Tubing (size, grade, and measured depth 5-1/2% 17#, L-80 NPCT @ 11406' MD; 4-1/2", 12.6#, MN-80 NPCT @ 11534' MD. Packers & SSSV (type & measured depth) 9-5/8" X 5-1/2" BAKER SAD PACKER @ 11395' MD. 5-1/2" OTIS RQM SSSV @ 2223' MD. 13. Attachments Description summary of proposal ___X Detailed operations program __ BOP sketch __ 14. Estimated date for commencing operation 15. Status of well classification as: August 2, 2000 16. If proposal was verbally approved Oil __ Gas __ Suspended __ Name of approver Date approved Service ___.(Water In j)__ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Call Joe Anders / Jerry Dethlefs @ 659-5102. Signed /~-_-¢~,.~¢'-,¢~ ('~._. Q¢~--~"~/~ '-~¥' Title: BPA Problem Wells Specialist Date Jerr~ Dethlefs FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness I Approval_no:. Plug integrity __ BOP Test__ Location clearance --I 3 Mechanical Integrity Test ~,~W~,~\ [..~.~"4,. Subsequent form required 10- ~,,¢x~ ~.3t~.~,~ ~'-~,~_.~\t,~-~--~k,,4 Appr..o..v..ed by o rder of the Commission Commissioner Date ....... _ ........... .- A ........ ,4' ~ ...... , ..... · ' · - ORiGiNAL ~IGNED BY ,pi PY D Taylor Seamount Returned ,., _ PI,-,~o-', ~,,-,t..rn fn PRR.9,4 - I - DS 01-08 Sundry Request SUNDRY DISCUSSION AND PROPOSED ACTION PLAN July 27, 2000 DISCUSSION Prudhoe well DS 01-08 (PTD 175-026) failed an MIT-IA on 6/14/00 due to lack of pressure stabilization during pre-pit dewatering pressure testing. A pressure loss of 100/140 psi in 15/30 minutes was observed. A leak rate of 0.76 gpm was established into the IA @ 2500 psi. The leak location is unknown and is too small to locate with normal logging tools. The well is currently injecting produced water at 11,000 BWPD @ 1500 psi. The well last passed an MITIA @ 2500 psi on 6/26/98 prior to pit-dewatering. This Sundry request is to allow continued water (only) injection into well 01-08. Justification for the request: · The slow rate of pressure loss (-_-100 psi / 15 minutes) indicates the leak is small; · The leak rate will be monitored and quantified with annual leak rate tests. PROPOSED ACTION PLAN 1. Continue water injection (only) into the well; 2. Monitor wellhead pressures daily; 3. Conduct yearly MIT-IA / LLR test. When leak rate is large enough, run leak detect logs to locate leak point; 4. Perform 4-year CMIT T x IA; 5. Submit monthly report of injection rate and tubing & IA pressures; 6. Shut-in and secure the well should MIT's or wellhead pressures indicate problems and notify the AOGCC. : APh 500292016000 Well Type: INJ RKB: 72ff H2S: Spud: 6/4/75 KOP: 0.00 ftKB Tub~ SSSV Type:, 2 Orig Compltn: 7/22/75 PBTD: 13304.00 ftKB Annular Fluid:i Diesel/10.6 CaCI2 Last W/O: 10/22/76 TD: 13550.00 ftKB Reference Log: BHCS Ref Log Date: 7/7/75 Max Hole Angle: 63 deg @ 8100 Last Tag: Last Tag Date: Angle @ TS: 52 deg ¢,, 12683 Rev Reason: FISH Last Update: 4/16/98 Angle @ TD: 55 deg @ 13550 EleV~tion~ :: : KB I 72 ft Cas Flng 0 ft GrdI 0 ft Tub Head 0 ft KB-Grd 72 ft Depth ID Type Description 2223 4.562 WSSSV 5-1/2" Otis RQM SSSV Nipple 11310 4.455 eLS 5-1/2" Otis XA Sliding Sleeve 11347 4.455 NOGO 5-1/2" Otis XN Nipple 11354 0.000 PBR 5-1/2" BeT PBR Assembly 11395 0.000 PKR 9-5/8" x 5-1/2" Baker SAB Packer 11406 0.000 XO Crossover 5-1/2" x 4-1/2" 11468 3.813 NIP 4-1/2" Otis X Nipple 11531 0.000 SOSUB 4-1/2" BeT Shearout Sub 11534 0.000 TTL 4-1/2" Tubing Tail 13304 0.001 IBP IBP ~ 13314' wi10' CMT on Top (Set 08/29/90) General NOt~S :: : : : Date Note Leaking Sqz Perfs 13000' - 13030' 11468 Min ID = 3.813" (4-1/2" Otis X Nipple) 11521' ELM Tubing Tail (Logged 10/22/76) FiSh,FISH : :: Depth Description Comment 135451 FISH FISH: A1 Inj Valve & Corrosion Coupon (Lost 09/07/97) Casing String; SURFACE ~ Item ToP I Btm I Wt Grd (in) (ftKB~ (ftKB) 13.375 in Casing .00 2674.00 72.00 MN-80 C~sihg StHhg i~ PRODUCTION Item Top I Btm I Wt Grd (in) (ftKa~ (ftKB) 9.625 in Casing .00 11960.00 47.00 MN-80 ca~ih~ String i~ LINER : :i ii.ii~ Item Topi BtmI Wt Grd (in) (ftKB) (ftKB) 7.000 in Liner 11647.00 13550.00 29.00 MN-80 Item Top Bottom Len Wt Grd i.'...~'~!~.'.~;~,-~'.'.~'.-.! .'.- (in) (ffKB) (ftKB) (ft) 5.500 in Tubing-NPC 0.00 11406.00 11406 17.00 L-80 · 4.500 in TubingoNPC 11406.00 11534.00 128 12.60 MN-80 p~O~ti~ns summa~ : Interval Zone Statu., Feet SPF Date Type Comment 12776 - 12786 ZONE 4 C 10 0 12/12/88 Sqz 12954 - 12964 ZONE 4 10 0 12/12/88 12970 - 12980 ZONE 4 10 0 12/12/88 13000 - 13030 ZONE 3 30 0 12/12/88 13050 - 13068 ZONE 3 18 0 12/12/88 13072 - 13092 ZONE 2 20 0 12/12/88 13096 - 13116 ZONE 2 20 0 12/12/88 13120 - 13140 ZONE 2 20 0 12/12/88 13160 - 13185 ZONE 2 25 0 12/12/88 13200 - 13225 ZONE 2 25 0 12/12/88 13280 - 13284 ZONE 2 4 0 12/12/88 13284 - 13290 ZONE 2 O 6 0 2/10/77 APERF 13370 - 13385 ZONE 2 O 15 0 2/10/77 APERF 13395 - 13435 ZONE 2,ZONE O 40 0 10/11/84 APERF I1B stimulations & Treatments:;; Interval Date Type Comment 12776 - 13284 112/12/88 SQZ 13284 - 13290 i 12/12/88 ISO 13370 - 13385 12/12/88 ISO 13395-13435 12/12/88 ISO Re: Well 01-08 (PTD 175-026) Failed MITIA ~- __ Subject: Re: Well 01-08 (PTD 175-026) Failed MITIA Date: Thu, 22 Jun 2000 07:59:15 -0800 From: Tom Maunder <tom_maunder@admin.state.ak. us> To: PRB Problem Wells <P1041@ppco.com> Joe, Thanks for the information. Please keep us informed of the diagnostic work. Good luck. Tom PRB Problem Wells wrote: > Hello Tom. Well 01-08 (PTD 175-026) failed an MIT-IA due to lack of pressure stabilization. During pre-pit dewatering pressure testing, a pressure loss of 120 psi~15 minutes was observed. The IA was bled to a tank and a leak rate of. 7 GPM was established. 01-08 is currently injecting produced water, 11,000 BWPD @ 1500 psi. The leak location is unknown. Plan is to leave the well online while evaluating the leak source. A tubing tail plug will be run, then another MIT-IA conducted to evaluate casing integrity. We will keep you informed of progress. Please call if you have any questions. Joe Anders, PE Problem Well Specialist Phillips Alaska, Inc. (907) 659-5102 plO41@ppco, com Tom Maunder <tom maunder~admin.state.ak, us> Petroleum Engineer Alaska Oil and Gas Conservation Commission ' ' ' 6/22/00 10:04 AM .... STATE OF ALASKA ,,LASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Alter casing _ Change approved program _ Abandon _ Suspend __ Operaf~on Shutdown __ Repair well _ Plugging _ Time extension __ Pull tubing __ Variance __ Perforate_ Name of Operator: ARCO Alaska, Inc. 3. Address: 5. Type of Well: Development __ Exploratory __ Stratagrapic _ Service _X P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface: 1078' FNL, 1517' FWL, SecS, T10N, R15E, UM At top of productive inten/al: 1515' FSL, 1800' FEL, Sec 4, T10N, R15E, UM At effective depth: At total depth: 5400' FSL, 1105' FEL, Sec 4, T10N, R15E, UM 12. Present well condition summary Total Depth: measured 13550 feet Plugs (measured) true vertical 9173 feet Effective Depth: measured 13308 feet Junk (measured) true vertical 8999 feet Casing Length Size Cemented Conductor 100' 20" Surface 2602' 13-3/8" 6400 Sx PF II Production 11888' 9-5/8" 1500 Sx Class G Liner 1903' 7" 700 Sx Class G Perforation Depth Reenter suspended well _ Stimulate _ Other _X 6. Datum of elavation (DF or KB feet): 72' RKB 7. Unit or Property: Prudhoe Bay Unit 8. Well number: 1-08i 9. Permit number: 75-26 10. APl number: 50-029-20160 11. Field/Pooh Prudhoe Bay Oil Pool Measured depth 100' 2674' 11960' 13550' measured All the perforations have been squeezed, but the well takes injection. true vertical All the perforations have been squeezed, but the well takes injection. Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT @ 11406' MD; 4-1/2', 12.6#, MN-80, NPCT @ 11534' MD. Packers and SSSV (type and measured depth) Baker SAD Packer @ 11395' MD; Otis RQY SSSV @ 2223' MD. Description summary of proposal _X Detailed operations program_ BOP sketch . Trueve~icaldepth 100' 2674' 8209' 9173' 13. Attachments 14. Estimated date for commencing operation 16, If proposal was verbally approved September, 1997 Name of approver Date approved 17. I hereby certify that the forgoing is true and correct to the best of my knowledge. Conditions of approval: Notify Comission Plug integrety _ ,,)¢ BOP test _ Mechanical integrety test _ Subsequent form required ,10- ~,tr 15. Status of well classification as: Oil _ Gas _ Serv ce Injector Suspended _ Title: Engineering Supervisor Date ¢,~/¢ ? FOR COMMISSION USE ONLY Location clearance_ h°,a'"°' Approved by order of the Commissioner Form 10-403 Rev 08/15/88 Original Signeo By David W. Johnston ~ommi~,~"":¢-~ SUBMIT IN TRIPLICATE Sundry Application DS 1-8' Simultaneous Gas / Water Injection Test Existing waterflood injection well DS 1-08 will be temporarily converted from a water injection well to a simultaneous water / gas injector. The purpose of this conversion is to test the reservoir injectivity with simultaneous water and gas injection. This test is expected to last approximately 3 months. The gas source will be from the DS 1-30 artificial lift gas line. Gas injection will be through the "companion valve" on the tree while water injection will continue through the "wing valve". During the test, the maximum gas injection rate is expected to be less than 20 MMSCFPD and the maximum water injection rate is expected to be less than 30 MBWPD. The gas injection rate, water injection rate and injection pressure will be monitored with existing equipment and will be reported on monthly on Form 10-406. As a active water injector, well 1-8 is equipped with a surface safety valve. If the test is successful, DS 1-08 may be permanently converted to a simultaneous water / gas injector. The gas source would then be from a high pressure, high GOR producing well. This will result in an increase in total field gas handling and therefore an increase total field oil production. ~ GeoQuest :500 W. Intern~.iior~al Airport I{oad iAnChorage, A~( 99518-1199 ATTN: Sherrie NO. ! 0237 Company: Alaska Oil & Gas Cons Corem Attn: Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501 6/1 3/96 Field: Prudhoe Bay Anadrill Anadrill Anadrill Floppy Well Job # Lo9 D~scription Date BL RF Sepia Survey Program Perforn3ance Disk Calculation Letter ~D.'s. 1-11 .'~,-0~'? 96103 [)UAL BURST TDT-P 960401 1 1:).S. 1-4 .-j~) ,X(, . . PERFRECORD 960528 I I ...... XD.S. "~-8 ?)-- ,~.I~ INJEC PROFILE 96051 9 I 1 ~).S. 2-3A W~-.I'/~ PROD PROFILE 960531 I 1 'D.s. 2-3A ~- {~ DUAL BURSTT~-Yi'-P (BORAX) ..... .960601 I 1 !D,s. 2-18A ..~rF- b ~ ['ROD PROFILE 96051 8 I 1 ~.S. 2-32 ~[ l [ ,~ iGAS DETEC'I1Oi ! 960530 I 1 '~;S, 2-35 ~l hl.? [.EAKDETECT!£!N__ .... 960525 I . 1 I~.S. 3-14 ~. 0~'1' PERFRECORD 960526 I 1.. ~/:).S. '~-36 ~5i.~5 !~ PERFRECORD 960523 1 I , ~)~.S. 4-29A '~'5'. /'7.,1 ....PERFRECORD .... .. '96051, .6, I I ,, --~ ~.S. 5-5A ~'f- 0'/~ DUAL., .BURS'.FT__?)~'-P (BORAX) ,960520 ,,! 1 /D.S. 5-11 '/?'- 0~O CHEMICAL CUTTER RECORD 960528 I 1 1~.S. 7-6A e!'. Iff 7 [)UAL BURST TD-~*-P (BORAX) ,96051 5 . ! 1 1~.S. ,,13-06 ~/- /~ ~ INJEC PROFILE 960524 , ! 1 ~.S. 13-18 ~';k- ~ ) i' INJEC PROFILE 960527 I 1 D.S. 15-08A c/) . I ~'~ LEAK DETECTION 960526 I I ..... P.S. 15-28 ~J~L 0~" LEAKDETECTI~N 960516 I 1 D,S. 15-32 ~,~ O¥? ....pERFRECORD 960517 I I ...... /D.S. .1,7-21 ~,L.,I,Z~" LEAKDETECT!ON 960519 I I ..... ~D.S. 18-31 ~'-! ll~ff DUAL BURST TDT-P (BORAX) 960521 I I .......... i! ·,~SIGNED: _ DATE: i ' ' ~.~ i~ Please sign and return one copy of this transmittal to Sherri~ at the above address. Thank you. JUN 1 ;5 1996; ,Alaska Oil & Gas Cons. Corr~ission Anchorage ..... STATE OF ALASKA ..... ALASKi-~ . AND GAS CONSERVATION C 'ISSION REPORT OF SUNDRY WELL OPP_.HATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1078' FNL, 1517' FWL, Sec. 8, T10N, R15E, UM At top of productive interval 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At effective depth 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At total depth 1540' FSL, 1105' FEL, Sec. 4, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 72 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-8i 9. Permit number/approval number 75-26/90-604 10. APl number 50 - 029-20160 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 100' Surface 2602' Production 11888' Liner 1903' 13550 feet Plugs(measured) 9173 feet 13530 feet 9125 feet Junk(measured) Size Cemented Measured depth True vertical depth 20" 100' 100' 13-3/8" 6400 SX PF II 2674' 2674' 9-5/8" 1500 sx CI 'G' 11960' 8209' 7" 700 sx CI 'G' 13550' 9173' Perforation depth: measured All perforations have been squeezed, but well is taking injection{Sr~ true vertical Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT @ 11406' MD; 4-1/2", 12.6~, MN-80, NPCT @ 11534' MD Packers and SSSV (type and measured depth)Baker SAB packer @ 11395' MD; Otis ~~.~tW~D. 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached DF_C '~ '~ 199(~ Treatment description including volumes used and final pressure A~;~Sk~. 0it & Gas 6ohs. r-,or~t~"s'''-~-'~ ~'~ Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure 6829 Tubing Pressure 587 12135 -- 778 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~..~.. -¢ . (.~'~ Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE"'~~,/ ~oo I'~ ('", D DS 1-8i DESCRIPTION OF WORK COMPLETED BRIDGE PLUG INSTALLATION FOR INJECTION PROFILE MODIFICATION 8/29/90: MIRU CT. RIH w/Inflatable Bridge Plug & set plug at 13320' MD (center), to isolate leaking squeezed perforations at · 13370 - 13385' MD Ref. Log: BHCS 7/7/75. 13395 - 13435' MD POOH. Rigged down. 8/30/90 - MIRU, & made runs w/dump bailer to dump 16 gallons of cement on top of bridge plug. POOH. Rigged down. 9/3/9O · RIH & tagged top of cement at 13294' MD. Returned the well to seawater injection and obtained a valid injection rate. Note: The well takes injection, but all perforations in this well were squeezed 12/13/88. Reperforations are being evaluated, but no plans exist to perforate in the near future. Squeezed Perforations above Bridae Plua that may be takina Iniection: 12776 - 12786' MD 12954 - 12964' MD 12970 - 12980' MD 13000 - 13030' MD 13050 - 13068' MD 13072 - 13092' MD 13096 - 13116' MD 13120 - 13140' MD 13160 - 13185' MD 13200 - 13225' MD 13280 - 13290' MD Ref. Log: BHCS 7/7/75. RECEIVED DEC '11 1990 Alaska 0il & Gas Cons. {;ummisSio~ Anchorage ARCO ALA;:.;KA, INC~ F:' O B il) X ~ u ~ ,.~ .~ (') ANCHOF;..'hC-E, AL. ASK A 99'5 ~ 0 D A T E ' i i "o, _. c;,, (:)., R El: I::' Iii: I:;: Iii: N C Iii: ' A F;..' C 0 C: A S' E D !"1 C] J... E F I N A t... S i .... 8 i (') .... i 7'-' 90 I N,.Jiii: C: T I 0 N P R 0 F:' I I... Iii: 4 - i i (') - 2. iii '"' 9 (:' F' E F;,' F R Iii: C 0 F;,' D 6 .... i 6 i i .... 4 -' 9 (:~ C 0 L L. A R / F:' E R I::' .... ) .~ ' . .... c:~ .... ,:.., '~(9 i ~ .... 90 Pii"S i ':~- :~ ~ ,:::, .... ~ o c~ (~, F:'R 0 D U C 1' T 0 N P R 0 F:' I L. E &.. ~ .... L.~ .... t ~ ~. . L. E.~..~ k D E TE C: T I 0 N i 2.""8B i G""'2'.~::'"'9'3'~" ' iS .... 8 i(') .... i8-9(:' F:'M i'EMP i4-:5i iG .... i7 .... 9G TEMP i5: .... 2 i(') .... i7 .... 9G F:'RE-'F:RAC F'II"S i ':~.., - ~. ''~ '~, i .... i .... 9 O) C C L.. / F:' E R F: i 5: .... 2 i i <¢' .... i 6- 9 (') F:'R E'"' F: R A C S U R V E Y A N).') F:tii:'i" U F;,' N T t"liii: A i" '¥' A C: H E D C 0 F:' 'f i..iA\/E A NiCtii: DAY~ R U N R'UN RUN RLJN F;..' UN RUN I:~: !.J i".4 F< t..l N RLJN. RUN RUN. A S F;.'. li!: C ii'.': t F:' 1" U I::' ii:' A '¥' A ,. C A M C: 0 $ C t--I ATLAS C A N C C) CAMCO C A a C 0 C A i'q C 0 C A ri c: 0 C A H C: 0 A'i"I...A S C A M CCI D I S 'i" 1:;..' I B U 'T :i: C)N RECEIVED NOV 15 1990 Alaska Oil & G~s ¢on~. Oommiesion Anchorage ---- STATE Of ALASKA · ALASKA .. AND GAS CONSERVATION C( ,ISSION APPLICA, ION FOR SUNDRY APPROVALS 1. Type Of Request: 2. Name of Operator ARCO Alaska, Inc. Abandon Suspend Operation shutdown Alter casing Repair well Plugging Change approved program Pull tubing 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 Variance Re-enter suspended well Time extension .~'~ ~-.~St~e 6. Datum of elevation(DF or KB) 72 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-8i 9. Permit number 75-26 10. APl number 50 - 029-20160 4. Location of well at surface 1078' FNL, 1517' FWL, Sec. 8, T1 ON, R15E, UM At top of productive interval 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At effective depth 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At total depth 1540' FSL, 1105' FEL, Sec. 4, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 13550 feet Plugs(measured) 9173 feet Effective depth: measured 13530 feet true vertical 9125 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 100' 20" 100' 100' Sudace 2602' 13-3/8" 6400 sx P F II 2674' 2674' Production 11888' 9-5/8" 1500 sx CI 'G' 11960' 8209' Liner 1903' 7" 700 sx CI 'G' 13550' 9173' Perforation depth: measured None Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT@ 11406' MD; 4-1/2", 12.6#, MN-80, NPCTtail @ 11534' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 11395' MD; Otis RQY SSSV @ 2223' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation I 15. Status of well classification as: August 1990 ! Oil Gas Suspended 16. If proposal was verbally approved I Name of approver *~ Date approvedI Service Injector 17. I hereby,certify that the foregoing is true and correct to the best of my knowledge. Signed ~ Title Sr. Area Operations Engineer Date 'FOR COMMiSSiON LI~E ONLY Conditions of approval:. NOtify Commission so representative may witness Plug integrity; BOP Test ~,~: Location clearance MechaniCal Integrity Test Subsequent form required 10- Z¢ o/-) Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH I Approval No. ~) _ ~¢~ ¢ ~pprOVed CoPY Returned Commissioner Date "' Form 10-403 Rev 06/15/88 441 ~P. Iq ~P_' . I P~ri ih~r ATC~-I Zl.7R SUBMIT IN TRIPLICATE DS 1-8i Inflotable Bridgeplug Plugback Procedu.~ Objective: Set bridge-plug above Romeo thief interval. Cap bridge-plug with 10 linear ft of cement. Re-establish injection into the Tango and Victor intervals. The attached procedure incorporates the following major steps: 1. Tag bottom with 3 3/8" dummy gun on slickline. 2. RU E-line with 7" inflatable bridgeplug. Set plug at 13,320'. 3. RIH with E-line dump bailer and cement. Dump 10' of cement. 4. WOC for 1-2 days. 5. Tag cement to ensure hardness. 6. Reperforate as recommended by DS #1 surveillance engineer. 6 5 4 3 2 . COILED IUB[Ni~ UNIT BOP E~IU 1 PllENT 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYD~ULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 H]REL]NE BOP EOU]PMENT 1. 5000 PSI ?" WELLHEAD CONN£CIOR fLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PS~ 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO Alaska, Inc. Prudhoe Ba~ _ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-8i, Approval No.7-900 Dear Mr. Chatterton' Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/MJB/jp Attachment CC: T. B. Gray, BP J. Gruber, ATO-1478 PI(DS 1-8i) W1-3 ARCO Alaska, Inc, is a Subsidiary of AtlanticRichfieldCompany AF{;~B -6132-C ~--- STATE Of ALASKA ALASK[~ AND GAS CONSERVATION C' ,ISSION REPORT ,JF SUNDRY WELL OP,--RATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1078' FNL, 1517' FWL, Sec. 8, T1 ON, R15E, UM At top of productive interval 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At effective depth 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At total depth 1540' FSL, 1105' FEL, Sec. 4, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 72 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-8i 9. Permit number/approval number 75-26/7-900 10. APl number 50 - 029-20160 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 13550 feet 9173 feet Plugs(measured) Effective depth: measured 13530 feet true vertical 9125 feet Casing Length Size Conductor 100' 20" Su dace 2674' 13-3/8" Production 11960' 9-5/8" Liner 1903' 7" Junk(measured) Cemented 6400 sx PF II 1500 sx CI 'G' 700 sx CI 'G' Measured depth 100' 2674' 11960' -'" ~! ?~ 13550' True vertical depth 100' 2674' 8209' 9173' Perforation depth: measured See attachment true vertical See attachment & {~as Cons. Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT @ 11406' MD; 4-1/2", 12.6~, MN-80, NPCT tail 11534' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 11395' MD; Otis RQY SSSV @ 2223' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attachment Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Averaqe production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 39289 Tubing Pressure 1609 Subsequent to operation 25957 1818 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~.,,~-'~ ~ ~c-~~: Title Operations Engineering Manager Date ,~'~' Form 10-404 Rev 06/15/88 lP7 ~/1 .I Rrnwn PRR-RCPIP SUBMIT IN DUPLICATE DS 1-8i DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE: INJECTION PROFILE MODIFICATION 12/10/88: A CTU Squeeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/seawater. Pumped 95.5 bbls cement, squeezing perforations: 12776 - 12786' MD Ref. Log: BHCS 7/7/75. 12954 - 12964' MD 12970 - 12980' MD 13000 - 13030' MD 13050 - 13068' MD 13072 - 13092' MD 13096 - 13116' MD 13120 - 13140' MD 13160 - 13185' MD 13200 - 13225' MD 13280 - 13290' MD 13370 - 13385' MD 13395 - 13435' MD Put 91 bbls of cement behind pipe, with no significant pressure bump. Contaminated cement with 110 bbls contaminant. 2/11/89: Cleaned out contaminated cement from WB. 2/13/89: A Resqueeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/seawater. Pumped 100 bbls cement, squeezing perforations: 12776 - 12786' MD Ref. Log: BHCS 7/7/75. 12954 - 12964' MD 12970 - 12980' MD 13000 - 13030' MD 13050 - 13068' MD 13072 - 13092' MD 13096 - 13116' MD 13120 - 13140' MD 13160 - 13185' MD 13200 - 13225' MD 13280 - 13290' MD 13370 - 13385' MD 13395 - 13435' MD Put 100 bbls of cement behind pipe. No significant pressure bump. Contaminated cement with 100 bbls contaminant. 12/13/89: Cleaned out contaminated cement from WB. Following the squeezes, no reperforations have been shot. Well was returned to injection and a valid injection test was obtained. ATI'ACHMENT DS 1-8i Perforation Intervals 2776- 2954- 2970- 3000- 3050- 3072- 3096- 3120- 3160- 3200- 3280- 3370- 3395- 12786 12964 12980 13030 13068 13092 13116 13140 13185 13225 13290 13385 13435 8703-8709' 8810-8816' 8819-8825' 8837-8855' 8867-8878' 8880-8892' 8894-8906' 8908-8920' 8932-8947' 8956-8971' 9005-9011' 9059-9068' 9074-9097' ARCO ALA.S'KA, INC, P,O~ BOX iOOS60 ANCHORAGE, ALASKA DATE · 5-9-89 RtEFFZRENC1E' ARCO CASED HOLE F'INALS t .... 8 4-t 6-89 t -24 4-8-89 2-i 2 4-23-89 2-i 4 4 .... i'5-89 '2- i 7 2- i '7 -89 2'''''''~ 4- ,..S t ~'~-.- 89 ,1--.7 4-i 6-89 4-.2~ 4- t 8-89 7....25 4-t 0-89 9 .... t 4-. 1 ~.-89 t t-3 4-24-89 1 t-t 0 4-t 4-89 ti .... t6 4-i2-89 I 2-'7A 4 .... i 9-89. i 2-i 0 4--2i -89 i 2-29 4-2S-89 i ~:]-'-3 4--i 4-89 t S-8 4-22-89 i 3-23A 4-2S-89 i 4-2 4-i 9-89 i4-i8 4-6-89 t 6'-i i 4-24-89 i 7-'6 4-i 9-89 t '?-8 4-t 7--89 iS-S 4-2i -'89 i 8-'7 4-2 i --89 I N d E C l' I 0 N F:' R 0 F I [.. E R U N F'F','ODtJCT I ON F'ROFII_E RUN 'i' E:' M P , R U N F'RODUCTI ON F'F;:OI;:' I LE RIJN SF:'I NNER/TEMF:'/FI...LJ I D DFNS/GI:;..' RLIN F'RODUCT I ON F'ROF I I_E RLJN F:'RODLJCTI ON PROF I LE R'UN SF' INN El;,'/T EM F' I:;: U N I... E A K I) E'f' E: C T I 0 N R U N F'RODUCTiON F'ROFILE RUN LEAK DETECTION RL.IN LEAK DEl'ECl'ION F;,' U N PRODLJCT ]: L1N F:'ROF I LE RUN F'RODUC'f'ION LOGGING ,.'.S'VCS', F,,'UN GAS LIFT SURVEY RLJN t"EMF' RUN L..EAK DETECTION I:<UN PRODUCTION PROFILE RUN MI INJECTION PROFILE RUN PRODUCTION PROFILE RUN F'I TS RUN L. EAK DEFECTION RUN INJECTION F'ROFILE/TEHP i',.~LJN HUL'i"I-RAI'E INJEC'I"/'ON F'ROF~LIE RUN PRODLJCT]:ON LOGGING SVCG'. RUN F't;,'ODUC'IFION LOGGING 5'VC$. RUN · .- ,~I .. 'l # F't...EA,~E SIGN AND RE. TURN THE ATTACHED CClPY AS RECEIPT OF' DA'FA ~ CENTRAL FILES ~- F'HILL. I F:'S :Il: CHEVRON ~ MOB I L '"' EX'I'EN21 (lIN EXPL. ORA T I ON :~ BPX ~: E X X 0 N ~ ~ 5' T A T E CJ F MARATHON ~ TEXACO ALASKA 5" t "& '5" '3" 5" I:;.' Ii _,, '5" '2" &'5" '5" 5" 5" 5" t "&5" 2" &5" 5" 5" 5" 5" 5" 5" 5" 5" C A H C 0 C A M C 0 C A H C 0 CAHCO C A M C 0 C A M C 0 C A H C: 0 0 T I $ C A Pi C 0 C A M C 0 C A i'4 C 0 C A M t~; 0 CAMCO A'i'LA~' C A M C 0 (]AMC(] [:AMC[.] (]AMC(] C A M C 0 CAMCO C A M L; 0 o.: ~....j.-.. t., ~..~ rl _, O ........ L.; A I'1 L; U C A i"i U 0 A 'f'l... A,S' A'I't_A THE COF;;I:;,:ECT API-~ FOR 2-12 IS "1 "s ' ** 'tHE CORRE..,T AF'I~ FOR t6.-t i 15,' 50-029-20516 ARC() AL. ASKA, F' ,. 0, BOX ANCHORAGE, AL..ASI< A 995 J ¢ DATE~ 9.-S~-88 I:~E']F'EERENCE' ARCO CASED HOI_E F'INAL. S ~ -8 9- i 0-88 I NJEC'Y' I ON PF(:OF' I L.E: 2-~ ~-') 9-26-88 F'ERF RECORD -'"~'> 9'"',~.? 88 AMENDMENT TO ACBL. OF 5'-'~8""89 2-')') 9-23-88 F:'FC :5'" t 9 .... ~ -' 88 P R 0 D tJ C T I 0 N P R 0 F: I L. E ~""4 9-S-88 INJECTION PROFILE :~ "" 20 9 "" 2'"' 88 P R 0 D U C '1" I 0 N F:' R 0 f:' I L E :3-22 9'- ~ "'88 PRODUCTION F'ROFIL. E 5 - 27 9-2 -' 88 P R 0 D U C "f i 0 N P R 0 F I L.. E ~-"~ 9-9-88 PRODUCTION PROFILE 5- ~ 9- 9- 88 P R 0 D LJ C T I 0 N PR 0 F:' I L E 6-t 4 9-4-88 F'IT~ 7 .... i3 9-2S-88 COLLAR/PERF' 9'"'9 9-S-88 PRODtJC'i"I ON F:'ROF: ! LE t 5 - 9 9- 5: '"' 88 PR t ~""i OA 9-2i -88 VERTIL06 i.,. ~'- t ¢'A 9-2t-88 i~"'t2 9-t4-88 PRODUCTION F'ROF:iLE ...... ""~'" ~ 8 PRODUCTION I::'RC~F:' I LE: t 5-t 9 9-20-88 COMI::'L. tETION RECORD i ~'_, - ~..':~ ~',, 9'"' 2 S- 88 COl... _ LAR i 6-4 9-2-88 C-AMMA RAY i7 .... 4 9 .... t0-88 F'IT t8 .... t 9""it .... 88 PIT SAL. I...Y HOFrF:'tECK E:F;.'. A T C) - t ':~ '"' ~ 't"RAN$ ¢:88598 '~ /'1/ '" '" "[ .... D_ ~.~ Al.. I.. R ~ v E ......................................................... .............. . .' D :[ S i' R I B l,J T I 0 N RUN i , ~':'".., F;.:tJN t, S" RtJN i, 5" RLJN t, RtJN i , '5" RUN i, 5 ' RtJN t , S" RUN t , 5" l:;:tJN t , ..5" RLJN i, D" I:;.: i.J N RLJN i, 5" RUN 2, RUN t , '5" RUN t , ~" R UN i , .5" R UN i , 5" RUN i, 5" R[JN i , S" RLJN t , 5" RtJN i , 5" i:(U,iI , :.'." RUN t , ..,.':~'" RUN t , 5" OF DATA, CAMCO $CH ~ CAMCO (]AMC(] CAMCO CAMCO CAMCO CAMCO CAMCO C A M C 0 ATLAS CAMCO CAMCO ATLAb] ATLAS CAMCO CAMCO SCH ATLAS C A M C 0 CAMCO CAMCO C E N T R.A L.. F'I L.E S CHF'VRON D & M EXTENSION EXF:'Lf' "' ..) R A T I 0 N [:'XXON HAI'i'ATHON · ,- MC)B I L. :II: F:' Ft 1 I.. L. I PS F' B W E L I.. F' .[ 1... I:i 5' R & D :~ S A P C :,'[:,S' T A T E: 0 f:' A L.. A,S' K A '"' i E.,, ~ t., 0 .... · .~ ~ -,,-... 'Ir ~NCH[.)RAGE: AI...A,.~ K A !::.'1:!i !::' E F:.' F' N [; E ' ~ R. F: 0 I'.'.. A S E g H 0 t... E 1::' ]' N A L. [.'. I.:.i N l' R A I... t:." ]~L E S · "' ('.'. H .F7 V !-i' i7'~ N .ou· . _ '~: .F,"Y. Tt:'N1 fin F F !. [tRt~T T [IN .ilo -,- E X ¥ n N H6RA'rI-ION · "'.,,. NO~ .T.L ARCO Alaska, In Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager November 17, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-8 Permit No. 75-26 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. S cheve DFS/DMF/jp At t a chmen t Oil & 6~.s Cons. C, ommisslo" A~ch.o[aoje cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 1-8)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B 6132-C ..... STATE OF ALASKA AL/-, LA OIL AND GAS CONSERVATION CO, ,,iloSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~; Alter casing Time extension ~ Change approved program ~ Plugging [] Stimulate [] Pull tubing ~ Amend order F~ Perforate,~ Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1078' FNL, 1517' FWL, Sec. 8, TiON, R15E, UM At top of productive interval 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UM At effective depth 1515' FSL, 1800' FEL, Sec. 4, TION, R15E, UM At total depth 1540' FSL, 1105' FEL, Sec. 4, T10N~ R15E, UM 13550 feet Plugs (measured) 9173 feet 11. Present well condition summary Total depth: measured true vertical 5. Datum elevation (DF or KB) 77' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 1-8 Junk(measured) 8. Permit number 75-26 9. APl number 50-- 029-20160 10. Pool Prudhoe Bay Oil Pool 3 R ECEIVE NOV 1 8 1987 feet · Effective depth: measured 13530 feet true vertical 9125 feet .~!:,,~sk~ 0i~ & Gas Cons. c0m~iss[0~ Casing Length Size Cemented Measured dep'[15 Al'lT~l~l'~l'tical depth Conductor 100 ' 20" 100 ' 100 ' Surface 2674' 13-3/8" 6400 Sx PF II 2674' 2674' Production 11960 ' 9-5/8" 8209 ' Liner 1903 ' 7" 9173 ' 1500 Sx C1 G ~o11960' sx ' Perforation depth: measured 12970-12980'; 13000-13030'; 13050-13068'; 13072-13092'; 13096-1 13120-13140'; 13120-13140'; 13160-13185'; 13200-13225'; 13280-13290'; 13370-13385'; 13395. true vertical 8800-8806'; 8818-8837'; 8847-8858'; 8860-8872'; 8875-8887'; 8889-8901'; 8913-8928'; 8936-8951' ' ' ~bing(size, gradeand measured depth) ; 8984-8990 ; 9038-9044 ; 9052-9076' 5~"2 , 17#, L-80, 11406' MD, NPC tbg; 4~"2 , 12.6#, MN-80 @ 11534' MD, NPC tbg Packers and SSSV (type and measured depth) Baker SAB Packer @ 11395' MD; Otis RQY SSSV (a 22~' MD 12.Attachments Description summary of proposal ~.' Detailed operations program ~_ BOP sketch December 1987 13. Estimated date for commencing operation 14. If proposal was verbally approved Date approved Name of approver 15. I hereb/~ertify t~,,~t~e/~re~ng is true and correct to the best of my knowledge Signed _~~. _ _ Title Operations En~ineerin~ Manager Commission Use Only Notify commission~so representative may witness I Approval No. .~ Plug integrity L~ BOP Test ~ Location clearanceI Approved Copy Returned .,~ Conditions of approval Date /¢~../~' ~' Commissioner Approved by Form 10-403 Rev 12-1-85 WELLS/36 D. M. Fife, ATO-1510 by order of the commission Date 116' 1343f Submit in triplica~ DS 1-8 Coiled Tubing Unit Cement Squeeze Procedure AFE #797332 Property Code - 2182262 1. Cleanout fill to 13530' MD. 2. Shoot squeeze perfs from 12776'-12786', and 12854'-12864'. 3. RIH with CT. Wash the perforations with full strength mud acid/15% HC1. Put well on injection to disperse the acid. 4. RIH with CT. Fluid pack the tubing with filtered water. 5. Pump 90 bbls of cement followed by 2 bbls of water and 250 bbls of contaminant. Hold 5100 psi for at least 60 minutes. 6. Jet or reverse out the contaminated cement. 7. Reperforate the following intervals: (Ref.: BHCS 7-7-75) Interval SPF Comments Zone 12746'-12787'f 4 Add Perf 12800'- 12808 4 Add Perf 12820'-12876' 4 Add Perf 12896'-12942' 4 Add Perf 12970'- 12980' 4 Reperf 13050'- 13140' LSD Reperf 13160'- 13185' LSD Reperf 13200'- 13225' LSD Reperf 13280'- 13290' LSD Reperf 13370'-13385' LSD Reperf Zulu(4) Zulu(4) Zulu(4) Zulu(4) U. Victor(4a) Victor(2c) Victor(2c) Victor(2b) Tango(2b) Romeo(2a) 8. Put well back on injection. · i Jll~ .... ~ ii i i ii i i ii ii iI i ii iii i ii ...-..-,--,~. . ~ 3 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANOE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) :3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PS1 4 1/6" FLOW TUBE PACK-OFF WIRELINE BOP EOUIPMENT 6 4 2 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE ~2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX III I I I I II CO ] LED TUB ]NG: UN ! T BOP Ei~U ! PNENT IIIII II II I ARCO Aia~km, Inc, Anchormge, A [moskm 99.5 DAI'E:: 9-25'"'87 RE.I:ERENC:E: ARCO Cas'ed HoLe F'inaL 4-~ 8-t6--'87 ProducTion F'rofi I.e Run i, 5" Camco i-.-E1 8-.22--87 Injection Pro fi Le Ru.n i, 5' Camco t-5 8-2e--8'7 F'roducfion F'rofi Le Run t, 5" Cam~:'o 4 ...- 5 8 -. 2 ~ .... 8'7 F' r o d u c t i o n F' r o f i L e R ~ n i , 5 ' C: a m c o 4-2 8.-24-87 F'roduc'[ion F'rofi [e/Ftuid Den.s., Run i, 5" Camco i4-i7 8-28-87 F'rodu. c~ion F'rofi Le Run i, 5' Camco tS-.6 9-i8--87 Injeci'ion Profi[e Run i, 5" Camco ~---28 9-..~6--87 F'u. mp-In Temperature Ru.~'~~ , 5" Camco ,5--.5 9--..9--87 F'roduc'~ion F'rofi [e Run ~, 5" Camco 5-'-~6 8--2S-.-87 CCL Run ~, 5" Camco ~.-J 9 .... ~0.-.-87 F'ump-..In" Temperature Run ~, '5" Camco S..28 8-..2~-87 t.eak l) etec'tion Rtzn ~, 5" Camco NDI-.~2 9-i5-87 40 Arm In.spection Catiper Run i, 2" Camco ti .... 25 9 .... t2.-.8'7 F:'rodu. c:'tion F:'rofi I.e Run t, 5" Camco '~" C a hi C 0 S...-9 ~..- 2 ?-.-87 P ~ T.? R u n ~ , .. I::'l. ea~e .sig'n a~'~d re'l.'uvn 'the at'l:.ached copy as' rec:eipi' of data. ICE DAY ( _J--:, HAVE A N ..... .. ' '" fl ~ SE A'¥' 0--. i 5 2 9 / / Anchorage ('~; F' 1 I' .oved ...................... ' .......... D I ::: "1' R I B I.J T I 0 N :,",:C e r, 't r a L F:' i L e s ql: I::' h i I. I. i !::' .s · ,,.'"' C h e v ~' o .~'~ F:' .P.. W e I. I. F' i I. e _'..;' I) & M R & '.f.') '"' ~' .AI::'C · 'I~ F.: x i' e n:.~' i o n E x p I. o r a T i o n ~ .,- ..., .IL · ,,- E x >.'. o n :,",: ' S +. a t: e o f A. L a .'..;' · H a r' ,~ '!' h o n ~ 1" e x a c o II. ,,. f'i o b i L F:',.Ci~ Bc)x i8C')3;6() Anchorage, ALa.s"l<a DA'fEi' JuLy 6, i987 REFEI:'(ENCE: ARCO Ca~ed I--Ic~Le F'i ne L l::'Lea:~e ~ign and i::' I. o p ,. P .,. L _. ( C C L./6. R / H F:' / T E H I::', ) I::' i. op ~ F:'., I._., ((:.':CL./GR/I'~F'/'FEHP,) I::' Lop .,. F:' ,. L ,. (. CCL/6. R/HF:'/'f'EHF:'., ) Perf, Record F'er'f,. Record F' I. op., F'. I .... ( C, CI_/(;,F~/HP/TEHF'. ) F'erf, I:;.'.ecord F:'erf.. Record F' L o p, F:', L., ( H e m ~.:.', r y S p i n, ) F' I. o p ,. P., I_ ,. ( M e m o r y ,S' p i n, ) F/,., <, ret' Ltr~ R u n R ti 'n R u n R un R u'n F;:. u 'n I:;,' ti y'~ R u. 'n Received By ..... -- '- """~"o"2 Oil ,~. Gr~s .r,:::.~:s. O0;i:rHissJ0rl HAVE A NICE DAY! eo~8 line Peek ATO-t 529 'FRANS -,-8 7,..,44 A !D P F o v e d ................................................................................~. D I S T R .T. B U 'r I 0 N i, i, i, t, t, i, 5" 5" 5" .5" 5" .5" 5" dst,a ,, · "'.,- C:,:-:,r~tra L I:: i Les · "'.,,- [.'. h e v r o n I) & M :E E x .1: e n.s i o n E x p L o r .,3 t i r','n ~ Exxo'n ida r a 'f h on ~,.'"' Mob i L :~ I::'hi L L i p.s PB WeLl. Fi Le.s R & D · " ,S' o h i o '"'.~.'-";'fate. of A La..ska '~' Texaco A n c h o'r' ,':~ g e, A [ a .'...;' k a R E F:' Iii: R Iii: N C':lii: · A R C 0 C a .~i: e d i..I o I. e F:' i n a I. I) I .'.. I t-. I B U T I 0 N ,$': C e n 't' 'r' a I. F' i I e -.- C h e v 1" o n D & H ~: E x -I: e n ~ J o n E x p 1. o ¥' a ~,.' i o n · ".~: E x x o n Ha'r'athon -.. P'iob i 1. ~,.""F'h i l Iip s' PB Well. I::'i I.e.? R ~ D ¢: ~i: o h i o :~": ,~tate o1"' A La.s"l<a ~: "['e x a c 0 ARCO Alaska, Inc. Prudhoe Bay L~gineering Post Office Box Anchorage, Alaska 995'! 0-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering k{anager November 25, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton- Re- DS 1-8 Permit No. 75-26 Enclosed is the "Subsequent" Sundry Notice detailing work completed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/TLB/sd Enclosures cc: Standard Alaska Production Company File: Pi(DS 1-8)W1-3 ARCO Alaska, Inc. is a S[~bsidiary of AtlsnticRichfieldCompany STATE OF ALASKA ALAS~... OIL AND GAS CONSERVATION COMM..,,SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate I~ Pull tubing EJ Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 72' RKB Feet 3. Address 6. Unit or Pl~oc:)uec~thVo%ar~ty Un i t Foss: 0ffice Box 100360, Anchorage, AK 99510 4. Location 1078' At top of 1515' of well at surface FNL, 1517' FWL, Sec. 8, T10N, R15E, UH productive interval FSL, 1800' FEL, Sec. 4, TION, R15E, UM 7. Well number DS 1-8 8. Approval number 466 At effective depth 1515' FSL, 1800' FEL, Sec. 4, TION, R15E, UM At total depth 1540' FSL, 1105' FEL, Sec. 4, TION, R15E, UM 11. Present well condition summary Total depth: measured 13550 feet Plugs (measured) true vertical 9173 feet 9. APl number 5O-- 029-20160 10. Pool 13400 Prudhoe Bay Oil Pool Effective depth: measured 13530 feet Junk (measured) true vertical 9125 feet Casing Length Structural Conductor 100' Surface 2674' Intermediate Production 11960 ' Liner 1903' Perforation depth: measured Size Cemented Measured depth 20" To surface 13-3/8" 6400 sx PF II Cmt 9-5/8" 7" 1500 sx Class G Cmt 700 sx Class G Cmt True Vertical depth 13050'-13140', 12970'-13435 true vertical 8778' -8830', 891 3 ' -9047 ' Tubing (size, grade and measured depth) 5~-" 17#, L-80, 11534'MD Packers and SSSV (type and measured depth) Baker SAB Packer' @ 11395'MD Otis RO. SSSV ¢. 222.R'MD 12. Stimulation or cement squeeze summary 100' 2674' 11960' 11647'-13550' 100' 2674' 8209' 9173' Intervals treated (measured) Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure ~bing Pressure 13800 680 902 13900 675 770 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~,~/Z .~~,~t~/ Form 10-404 Rev. 12-1-85 TI R (265-6998 Title Operations Engineering Manager Date '~/~d¢l~ I Submit in Duplicate SUMMARY OF OPERATIONS On October 27, 1986, perforations were added to the current 1-8 completion interval. Gearhart performed the job using a 3-3/8" tool with density jet shots. The perforated interval was from 13050'-13140'MD (Ref: BHCS 7/7/75). The shot density and orientation used were 1/4 spf and 0°, respectively. STAT16/1-8 ARCO Al.a.~:ka, I'nc~ P ,. 0 ~ B o x 'i () (.) S 6 (') Anchc, rage, ALa.s'ka 995 ~ (') I"1o I. e Fi'ha I. & I::' e r l"' ,. Log Ru'n ~, & F:'er'f"~ i...og Run ~, t... o g !:;,' u n '1 , [:,ea 'r' (::, e a r o 'l: d a 't' a, D I ~i: T R I B LJ T ]: 0 N :,T- C: e n '~' r a I. F' i L e.'...;' ~: C h e v r o 'n D & M :II: E x -t: e'n s i o'n Ii!: x p L o r a -!: i o ¥'~ · $" Iii: x x o n M a r a .!: h o o :Il: N o t::, i I. · "'.,. Phi t. t. ip F:'B Wel. I. F:'i Le · '" 5' o h i o -,-'"' '¥' e x a c: o ARCO Alaska, Inc. Prudhoe Bay ~.,,gineering Post Office Box 100360 Anchorage, Alaska 995'~0-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 8, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 1-8 Permit No. 75-26 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve D FS/SAS: sd Enclosure cc: Standard Alaska Petroleum Co. File PI(DS 1-8)W1-3 ARCO Alaska, Inc. is a Subsidiary of AttanticRichfieldCornpany STATE OF ALASKA ALASK.. OIL AND GAS CONSERVATION COMk. _,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order ' - Perforate ~ Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 72' RKB feet 3. Address 6. Unit or Posl~ Office Box 100360, Anchorage, AK 99510 Unit 4. Location of well at surface 1078' FNL, 1517' FWL, Sec. 8, T10N, R15E, UN A[ top of productive interval 515' FSL, 1800' FEL, Sec. 4, T10N, R15E, UN At effective depth 1515' FSL, 1800' FEL, Sec. 4, T10N, R15E At total depth 1540' FSL, 1105' FEL, Sec. 4~ TION~ R15E 11. Present well condition summary Total depth: measured feet true vertical 13550 feet 9173 Effective depth: measured feet true vertical feet , UM ~ UM Plugs (measured) Junk (measured) 7. Well number DS 1-8 8. Permit number 75-26 9. APl number 50-- 029-2016 10. Pool Prudhoe BaS 0il Poo] 13412' Casing Length Structural Conductor 100' Surface 2674' Intermediate Size 20" 13-3/8" Production 11960' 9-5/8" Liner 1903' 7" Perforation depth: measured Cemented 6400 sx PF II cmt Measured depth 1500 sx Class G cmt 700 sx Glass G cmt 13050' - 13140' true vertical 8778' - 8830' Tubing (size, grade and measured depth) 5:" 17# L-80 11534' MD 2 , , , Packers and SSSV (type and measured depth) Baker SAB Packer @ 11395'MD Otis RO $$$V @ 2223'MD 12.Attachments 100' 2674' ~ue Vertical depth 100' 2674' 11960' 13550 8209' 9173' Description summary of proposal [] -.. ' "..~','.-~ 0ii & C::fi Ccri::. C~: :::', :::,:::! Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation October 25, 1986 14. If proposal was verbally approved Name of approver Date approved 15. ' hereby~ertify____ /¢//.......t~h/~ ~J~e f~r-~egoing is true and correct to the best of my knowledge Signed. ~,~.~¢~, ,¢¢~,,~¢~/¢~-~~'_ . Title Operations Engineering Manager Commission Use Only Date Conditions of approval Notify commission so representative may witness I Approval No. <i'~./'~'~..~ [] Plug integrity [] BOP Test [] Location clearance ~I ;~,~ by order of Commissioner the commission .Approved by i j~ LilY'iii IL f,[lll Form 10-403 Re~:85 SAS (6872) Submit in triplicate ARCO Alaska, Inc. proposed to perforate Well 1-8 at selected intervals within the Sadlerochit sand of the Prudhoe Bay Unit. Upon completion of the perforating procedure, Well 1-8 will be returned to normal injection. The procedure will consist of 6 passes with a shot density of 1/4 spf. The procedure will add 90'(MD) of new perfs from 13050'-13140'(MD). Upon completion of the procedure, the well will be secured and service company rigged down. Ref. Log: BHCS 7/7/75 Proposed Interval- 13050'-13140' MD 8778'-8830' SSTVD ARCO Alaska, Inc. I::'~0, Box i00360 Anchorage, ALaska 995i~ DATE:' ,~ ep.'t emb er~."~"~, i 986 REF'ERENCE' ARCO (]axed Hol. e Final --~'i-6 9-L3-86 Spinner I_og Run i, ~-8 9-8-86 Inj. F'rofi te Run t, ~i-.i 5 8-~t-.86 F Lowmeter Run i , ~i-t7 8-i~i-86 Spinner Log Run t, ~-5 9-3-86 Spinner L. og Run t, ~5--23 9-4-86 GR/SPIN/WHUT Run i, ~:3-2~ 9-7-86 F'ump in Temp~ S~rvey Run i, ~-24 9-7-86 Pump in Temp. Survey Run t, ~-.24 9-6-86 GR/SPIN/WHUT Run i, ~:~-28 9-5-86 Pump i~ Temp. Survey Ru}~ t , ~'.S--4 9-4-86 Spinner Log Run i, ~5-ii 9-4-86 Spinner Log Run i, ~9-i~ 9-7-86 In.j, F'rofi te Run i, 9-,8 8-.~i-86 TEHF'. Log Run t, ~--~ 8-28-86 Spinner Log Run i, ~l-i~ 9/5-6/86 Spinner i_og Run t, 5 ' 5 ' 5' .5 ' 5' 5' 5' 5' 5' 5' 5' 2' 5 ' 5' 5' C8 ~lc o C a m c: o Ca mc o [; a m c: o C a mc o C a m c o C a ~l C: 0 C a m c o Camco C a m c o C 8 ~lc o C8 ~lc o C a m c o C a m c: o i::'l.e@s"e .'.~ign a~urn th.~'~'~tached copy~...a-q receip~ of ~ .~,. ~.,~ ~ Alaska Oil & Gas Cons, Commbsion ~ / .... / ~ Anchorage TRANS cia ~a, I) I S' l' I:;: I B U T I 0 N ARCO A-:'-aska, Ir, c. p,,_,,r' ,.~:'ox. ~ ~0S6r'',-~ Ap. chormge: A Ira,_-.. km 995~ 0 .~.~,..':_.L t..e:=-ed [e --.-'l]a L I)$ 7-7A DS 7-8 DS 7-9 l',;!.,' 7 .... ~'" ~..-2' ;3'-'~ · DS !6-i 3- .5:-,.,'"'. - 9 6 X-'? Ca' ~;-e ' Run 5 R u'r~ i 5: 5" DA i).'a- -..-'.: .- . Sch C a m C o F'!~-',a!:e $ig',",, .re'nd ;-e--'.'ur'n ~h-,= ai'i'acr~ed cc.-py as 'recmiF,-f o-.:' irma Ca'...." I. ir., ATO-!429F ]"RAN$ _~86242 ARC(] At. ast<~, F'~O~ Box Anchorage, A[a.s'I<a DATE' Jar~uary 7, ~,986 REF"ERENCE · ARCO.. Ca ;:. .... .¥o~ I--lo L e F'i'n a i. z,' F:' L ~.:, a :!!.'e :~: i g ~"~ a 'n d r e '~' u. r r., t ~: e a ,. '!' a c: h e d Recei vecl By ............................................... HAVE A NiCE DAY! KeLLy McF'ar Lar,.d A T C./. - '! -,,', ".'..... :'~z ,I: (" C: l::" Y @ ::-': D I ;~: T F;.'. ]: B LJ T I 0 N ~ Cent'raL Fi Le.~ . 'Chevror~ D & N : Ex±en~ion ExpLoratio¥'~ Ex xon f-'i a r a t h o ~"~ Nob i I. Phi L Lip£' F:' B W e I. I. ' F:' i L e.'..~: R & D ,S' o h i o ,$-~a:'t.e of Ala'.~k@ Texaco ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 DAte August 21, 1985 REference: ARCO CH Finals 1-8" Spinner '~6-9 ~ Temp ~9-8 ~ Spinner ~x~9-12/Spinner ~.~/~ ~ 6~ Spinner -~15-20~Spinner ~5-20 ~ollar 16-10~Spinner 8-15-85 Run 1 5" Camco 7-31-85 1 5" GO 8-8-85 1 5" Otis 8-8-85 1 5" Otis 8-8-85 1 5" Otis 8-7-85 1 5" Otis 7-26-85 1 5" Otis 7-15-85 1 5" GO 7-25-85 1 5" GO Please sign as Received by Pam Lambert ATO 1429C Trans 282 receipt of data ~! ~_.~FI/%/[~E% ~ u~ ~;, e,~ Cons, Commission Anchorage Chevron Phi 11 ips D & M PB Well Files Expl. Services R & D Ext. Exploration Sohio Exxon State of Alaska Marathon Texaco Mobil ARCO Alaska. Inc. is a SuOsicliary of AtlanticRichfieldCompany ARCO Alaska. Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date: Jun 5, 1985 Reference: ARCO Pressure Data 1-8 PFO 5-15-85 Camco _. 1-18 Static Gradient 5-20-85 Camco 5-2' Static Gradient 5-16-85 Camco 12-21"Flowing Gradient 5-15/16-85 Camco 12-22 Flowing Gradient 5-19/20-85 Camco 12-27 PFO 4-17/18-85 Cameo 12-28-Flowing Gradient 5-17/18-85 Camco 12-29 ~-Flowing Gradient 5-16/17-85 Camco . ,., ... Para Lambert ATO 1429C Trans 138 Chevron D & M Phillips Expl. Services PB Well Files Ext. Exploration R & D Exxon Sohio Marathon ~a~e of Alaska Mob i 1 ~: ~T~xaco ARCO Aka~ka P,O, Box i0036(.) Anchorage, t ! .! DATE:' March F:.'.EFERFNCE · '~ ~ 98"~' A R L'. 0 Ca~e¢:i ... (:) .....t]'l =:..' · " ~I S- i i -85 3-.7-85 :.'5- i 0-.'8'.5 2; -" o ... q ~. ~-8--85 I'njec'l; ion r':"rof i re/Si::-- i~"..ner CF'I_/TDT MB w/I. i s"t' ing I~'~]e:,ct'ion Profi le/Spinner ,S'p i r)ner' I'njec:t'ion F'rofi le/,S'pir~'ler l'e~'0.1:~ e~- ~ '!: t.t~- e/Sp inner :,"e'[' urn i'he a'i."l.'ached c'opy as receip'~ of d a t' a. Received By ............................................ HAVE A N ICI-.' DAY! · Ke[I.y Nc:Fa~-i.a~'fd ,~,'rc', .... i 429F 'i" R A N $ "" ~ ..-056 I)I,.>~"r =' I B U T I 0 N, ,, . ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 10, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-8 Permit No. 75-26 Dear Mr. Chatterton: Attached is a "Subsequent" Sundry Notice for work completed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/JB/mjb Attachment cc: Sohio Alaska Petroleum Company File Pi(DS 1-8)W1-3 RECEIVED Alaska 0il & (~as Cons~ Commission Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfieldCompany -~' STATE OF ALASKA --' ALASKA L, _ AND GAS CONSERVATION CO .... ~ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] :2. Nam~ap~rska, In~. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) 1078'S & 1517'E Sec 8, T10N, R15E, UM (Producing Interval) 1515'N & 1800'W Sec 4, T10N, R15E, UM (Total Depth) 1540'N & 1105'W Sec 4, T10N,. R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) ~ 6. Lease Designation and Serial No. 72' RKB ~ ADL 2R32R 12. 7. Permit No. ?5-26 8. APl Number 50- 029-20160 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 1-8 (33-4-10-15) 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Arco Alaska Inc. has converted DS 1-8 to water injection service. This well is part of the Flow Station 2 waterflood project. The well began receiving water on December 18, 1984. Ref: BHCS 7/7/75 RECEIVED .!Ah! 1 ,,'", '.1985 14. I herebv ~J'tify that the f~reqoinq is true and correct to the best of my knowledge. AlasKa 0il& 6aS 0otis, C0mmi~si0n Date s, ..d *e¢o.a O erat ons ncneer The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date ..................... Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Cc, I. L a '~"/Pe'.," f i..c.,,:i ._ "f' e ¢.q i:-" e i" a '{' tl i- e ~"" ; ............ i...og ~,'/Y' :'~-" i::'- i '~"., '.,"., e ~" _',') e p !' h~;'" :....-- '-:.' e ~." m i '.,",. a -':,' i c:-: n E-.PI... ~ ._ ~'~ 1".. ~-" ~: I i I / ,'" '": ..,-. Io.. .-ol .- .--; ~-- : ...... ~-. ~,- i..: ?' ~:':./' Z'.'- :.-,." i i i i i ,=:', E'F' L. ii: P L.. ~"~"' !-"' D i -'-'7 IZ: I EF'L.. C C L.. / F' e'r' f F-:.'. e c: (:.','F d ~' C E T G F:.'. i,.~ .'C, i... :' · -;.':: c.',. m p .. e ~' i c:, n F ;.: ,'.'-:-- c :::---',-" d i:;..' u r, ! 5.:-'" t...-'" ,.,r'" . ._ R u. ni 5-" C a r:'~ ,'.:: ,.':.', F;..' t.'.--, n i ....-~'"-'" C a .,.;,', ~.¢' ,,.::, · '" '"~ 1"'"" --..%-.........-. F;: t-:'r'., i :>" .......- .... , ..... ~'., L i r.; e'r' ¢'¢"¢'-~..,.'.,"~ i 2 ": & 5" $ c h i::-.: u. n 3 "~' '" '"-.".'- ?.- ...~ ~,.,.. -..., .- R t..'. n 'i _: .':-.) A . R t'_, n i ....-"= :' Z..'.-' R u'n i 5:" g C':--' F.: u. n i 5" ;:.-:':' c i"...- i':, .-, ,,--, i !::' !~ ':." .-. !--. ..} :..:- ~..-' .= ~ '-. ~.'-. ! i R L-~'.,'~ i 5: '"' S" c h :"'- -":: !::' .q *.'.': ..-. b'-.' L,'. l"i .,-.. _:- ,.:. :.. :~ F.:-'. :..t n i ,S: :.::: h R .',t ni 5:" ::i: c h R u. n I 5" ;E-: ::: h F< u n i 5: :' ::i:-:::: h !::.:-:,:: r:: i 5-" " ....... ":: ....... ":: ::: ~ ,'.:i:-:.':: }' a n d ',." e '[ u.'.," n ± h e 8 i' i' a c: h ecl c: o p y a -'-: ~- e c: e i p t c.'-: f d .:: '[ a. NOV o 7 u,I a ~s Gens. Commission Anchorage i) i ,? T F:-:. i B U T i 0 N ,.,,, evi" c.', '...-., .".:.') & ?i F' x I::' L o r @ i' i o n S e r v i ¢ e.'.....- Ex Ce'n~i' i on EXp l. ora.*, i on lex x on '~'g-t-"T';,,' .... Fi a :,- a 't' i"., c:, Mob i l N..-.':)b[ i F & i::' F'hi L i i p--; 'F"..---u.c!hoe Bay WeL i. R & D '-:.~'h'~"~ .................... St_~±e o-f Alaska ..... F' i -[-es h:'EFERENCE ' RNL, U ~.,a:...~.:'-d Ho Le F'i ne ..... ,. ~. ,::: , l.. o g ',"-~' u'n i 5:" C--' 0 _-. ., ~-... . .'_._ · ~.., · ~, ... D ,. 5:.. E; --' 2 --i, -'"",,, -'- i 7 .,'" '~. 8 .... 84 T'e .,':'., p e '~" a i' -'.,., '..--- e R u.r., i ...~,:-' ,, 'r'-,., ...::-' .,,,--', ....," ~.,,"-- )1.':'-' Z 7.;:;-.. 2'i. '~ C, -- 12 .... 8 -'i- .i{: p i 'n'n e'~" L c, 0 F-:-'. '.-'..--:.,..":.- i ~:-'" C am...':.: .-'.::, a ~ I . ..--' . )'-::,. 5.' , iT!; 26 i,:.")-i'" .... ' '" , ..... · .-- - 82 Y i., i ,'.,'.,"~ e r i... o g ~--..' u.'n ~ 5" C a m c: o .". !"-.. ~ ... D ...... ..? -;:: ... '7.: ,...'"' '-':'~,. -" 4 .... 8 -'~. ..... l":, e ,':, t h ,...-"'"'- ::: .... -i.. e '.." m i r,. a -!: i c.', 'n C ,_"., ! i !::-' e '~" :---.. -.-.....:: D .. 5'.~ :5: ..... i ¢, 7--. i E'; .... 84 E F' L. F...' u n S 5 ' ~: c h D,. 5' , 6 --. 3 '! ,.,-":' --- 14 -- 84 -G.;..I:;.'. R u. 'n i 5: ' D A.. ..... ,.-, ,... ,.... ,:.. ,. · · · ~.--' * 'i"~ A ~_,- ,. c:. ,. I ~'--'" 'i C:,--'i I --E':,.,-DD f i'.,."-L..i._/(:;.i:i: R ur~ '~ ..;. ,., i'": ':"' " ' ... _. '"'" "" .'."" I::' C' / '-?: ,.; "'" ,., ,. ,-:., t 5-" 6 I ./:; 'i ,-' -" 8-'., ..... -. ..... ,., i 'ri'n.'...'.,',." :.--.-; u n 'i 5:" G 0 .,o~ · .... ! ..... ! i D,. ;:-7 ,. I ,.,: --' ,..'::' ,.t, ,.' -- ¢..-.. ,::: 4 ~.-.'!- ,.. .~-:. t..' n i 5-" Z c h · -~¥. -:.- .,-~ #.. '"'" :: I ,.~ "~:,,.;. 7 -" i c.- 4. E P L. ~-:' ,_,., , ,.., ,-. u ~."~ i 5: '" ;!," c n · ~-. n .'-.::i 4- i "-; o_ 4 -.-- :ii'.';---l- E F'i.. R u 'n i- 5: '" ,i-.:.'c h .. ,..,..... ~.. ,...-....-~..,, · , ,..,.~ .... ,';.; I::' l::,-'. ~ ;; ~"~2 ."-.'.' r' h ~'" ..... "';.' ~ -,.-I 8-- i ':~: .... n Z; _,.~'"-'" n '"..-' ;-.-: ~- ............... .s..- _. ~.. -.... : /i .. "2.' 0 '"' "" ' -%" LC' '.' '"' D ,. ,'.? ,. '~ --,...., i ,... -.. i; .... .'.::: -"~. L., ,... ~'< u-'nI 5: c h · , ,'.::, .,: ....... .."'...'".! /,':.: ........ --:-' "'. ,-~. r..? L~. !'l I ~'.'; :" :":.: r' !"~ ~":~ .~ ,S! ~ ', 4-'S'i :.: , c'::~ .... :::::-':~ ~.,~.,,..:, ~:-, ,,'-,:ecc, r :: · ~..'T. _. -'C., ~.; ,:Z, .....'" r., .? ~ ..: ~-. -,, :., i 4- ::::: 4 C E'. T r.:. ~.,. n i ':';" ;~: c h- · ,', ~" ,I ,:.'.'-- "~ .,'.", o. .... 'i '::' 8 4. ~.-.,'" ...--,.-'"' . F.: :-'..'.. 'n i ..-~'"" ' :"-.'~ c h ~ ....'- .... ,1..; ,~. ~'.'- ;. ,.-' .-.'.. '--.~.... D ,. ;}:..' i '"'" .... '-:' ;;;'::~ .... 1 4 .... 8 4. '"'":"' ";'~'"' .... ... ../. ..,;.. %/ ~. ,.,, ":'" '"-'" i 4 .... i 0 N o D 8 I- ~.';: C ..':.:, .,'~'., p ~. e '~' i c.'. 'n R e ,'.:: o '.,." d R u r,: ".'-.!..,"":" ..19 c: ~"., &..' ,n ~:- ~ .... ',. · F:' i. e a z:' e ..T i g r., a n d r e ~,.' u.'," r., t h e a ~' i' a c i"..-- e d c o p y a -':.: r e c: e i p t o f' d a 't' a, NOV 0 7 Alaska Oil & Gas Cons. Commission Anchorage [.'~h e\:r Ol~ ,,.; & M ExF,' lot@ !' i c)~ 5:err i c:e.~ E×'l:en~'t ion .Ei'P i~ra.'t' i~¥~ Ex xon .... Fi E, r a i.- h o ~.-~ F' ".,em' ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer November 1, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-8 DS 5-8 DS 17-10 Permit No. 75-26 Permit No. 77-24 Permit No. 81-97 Dear Mr. Chatterton: Attached are "Subsequent" Sundry Notices for work proposed on the above-mentioned wells, as well as Completion Reports. Very truly yours, D. F. Scheve DFS/JB/mjb Attachments cc: Sohio Alaska Petroleum Company File Pi(DS 1-8)W1-3 File Pi(DS 5-8)W1-3 File Pi(DS 17-10)W1-3 RECEIVED NOV Alaska 0Jl & Gas Cons. C0mmissiorl Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlanflcRIchfieldCompany '--' STATE OF ALASKA '~-- ALASKA _AND GAS CONSERVATION C( .~IlSSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL[] COMPLETED WELL OTHER [] Water Injector 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (surface) 1078'S & 1517'E Sec 8, TiON, R15E, UM (Producing Interval) ].515'N & 1800'W Sec 4, T10N, R15E, UM (Total Depth) 1540'N & ll05'W Sec 4, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 72' RKB I ADL 28328 12. 7, Permit No. 75-26 8. APl Number 50-- 029-20160 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 1-8 (33-4-10-15) 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 10/11/84. RU perforating unit, pressure tested equipment. RIH with gun ~1, shot interval 13415 - 13435' MD (4 spf). Shut-in well, POOH, all shots fired. RIH with gun #2, shot interval 13395' - 13415' MD (4 spf), shut-in well, POOH, all shots fired. RIH with gun fi3 shot interval 13010' - 13030' MD, (4 spf), shut-in well, POOH, all shots fired. RIH with gun #4, shot select fire interval 13000' - 13010' MD, pulled up, shot select fire interval 12970' - 12980' MD, 4 spf, shut in well, POOH, all shots fired. Ran SSSV, secured well, RD. Ref: BHCS 7/7/75 RECEIVED NOV 0 Alaska Oil 8, Gas Cons. CommJssJor~ Anchorage 14. I hereby c_,F~tify that the foregoing is true and correct to the best of my knowledge. Signed .... Title Regional Eng~ The space below for Commission use Conditions of APproval, if any: By Order of Approved by COMMISSIONER the Commission Date ..................... Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ~ STATE OF ALASKA "- ALASKf. _AND GAS CONSERVATION C ,vllSSlON ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well Water Injector OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~ .. 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 75-26 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20160 4. Location of well at surface 9. Unit or Lease Name 1078'FNL & 1517'FWL Sec 8, TiON, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1515'FSL & 1800'FEL Sec 4, TION, R15E, UM DS 1-8 (33-4-10-15) At Total Depth 11. Field and Pool 1540'FSL & ll05'FEL Sec 4, TiON, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 72' RKBI APL 28328 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 6/4/75 7/6/75 7/22/75I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 13550'MD 9137'TVD 13530' MD 9125'TVD YES~] NO [] 2226 feet MDI 1900' (approx.) 22. Type Electric or Other Logs Run DIL, Sonic/GR/Density, CBL . 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 100 ' 32- '~. 13-3/8" 72# N-80 2674' 17~" 6400 SX PF II cmt. 9-5/8" 47# MN-80 11960' 12~" 1500 sx Class G cmt. & 500-95 125 sx PF II 2nd stg. . ,, 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUB I NG RECOR D interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 13370-13385' MD w/ 4 SPF 5~ 11~568 11~433 13280-13290 ' MD 13200-13225' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13160-13185' MD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED *Added on 10/11/84 *12970-12980' MD N/A *13000-13030' MD Ref: BHCS 7-7-75 *13395-13435' MD TVD of Perfs: 8794-9070' 27. PRODUCTION TEST ,, Date First Production I Method of Operation (Flowing, gas lift, etc.) March 1977I Flowing , Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OI L RATIO 6-24-77 20 TEST PERIOD I1~ 1042.4 793.6 32.5 38° 761 Flow Tubing ~Casing Pressure CALCULATED.~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 945 N/A 24-HOURRATE ~1~ 1251 952.3 39 27.0 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED NOV 0 Naska 0il & Gas Cons. Commission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME ~ Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 12,517' MD 8520' TVD Shublik 12,581' MD 8559' TVD Sadlerochit Sand 12,684' MD 8623' TVD Base Sadlerochit 13,512' MD 9115' TVD 31. LIST OF ATTACHMENTS ,, 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed -~""~"///7 ~~~~..~.. _ _ Title Regional Enmineer Date ,.. ~/////~////~F INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". ARCO Alaska, In Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F, Scheve Regional Operations Engineer September 25, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 RE: DS 1-8 Permit No. 75-26 Dear Mr. Chatterton: Attached is "Notice of Intention" Sundry Notice for work proposed on the above mentioned well. Very truly yours, D. F. Scheve DFS/DWR/mjb Attachments cc: Sohio Alaska Petroleum File PI(DS 1-8)W1-3 ARCO Alaska, Inc. Is a Subsidiary of AtlanflcRIchfleldCornpany ~' STATE OF ALASKA - ALASl4 ¢.~AND GAS CONSERVATION ~ ...MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL[] COMPLETED WELL OTHER 2. Name of Oper~or ~RCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 (Surface) 4. Location of Well 1078' S, 1517' E, Sec 8, T10N, R15E, OM (Producing Interval) 1515' N, 1800' W, Sec 4, T10N, R15E, UM (Total Depth) 1540' N, 1105' W, Sec 4, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease Designation and Serial No. '72' RKB ' I ADL 28328 12. 7. Permit No. 75-26 8. APl Number 50-- 029-2016 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 1-8 (33-4-10-15) 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~( Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations to DS 1-8 with intent to convert to ~ water injection w~ell. Perforations will be added to selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 12970' - 12980' MD 13000' - 13030' MD 13395' - 13435' MD Ref: BHCS 7/7/75 RECEIVED Subsequent Work' Eeported / .~ A~s,,~ o~l & iJas Cons. O0mmissi0n Anchorage 14. I hereby/~rtify that_t~fore~in~ue and correct to the best of my knowledge. Signed ~.~/~,~ ~ ~,"//,¢./- ~ Title Regional Enqineer The space below for Commission use Date Conditions of Approval, if any: By Order of 7_~ Approved by COMMISSIONER the Commission Date ................. Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay ~.,,gineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer July 5, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 1-8 Permit No. 75-26 Attached is "Notice of Intention" Sundry Notice for work proposed on the above mentioned well. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments cc: Sohio Petroleum File PI(DS 1-8)W1-3 RECEIVED J U L 1 6 1984 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc, Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA --' ALASKA, ,L AND GAS CONSERVATION C ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL[] COMPLETED W E L LX~ OTHER 2. Name of Operator 7. Permit No'. ARCO Alaska, Inco 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell (Surface) 1078' S, 1517' E, Sec 8, T10N, R15E, DM (Producing Interval) 1515' N, 1800' W, Sec 4, T10N, R15E, UM (Total Depth) 1540' N, 1105' W, Sec 4, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 72' RKB 12. I 6. Lease Designation and Serial No. ADL 28328 75-26 8. APl Number 50- 029-2016 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 1-8 (33-4-10-15) 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [-] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to change Well DS 1-8 status from oil producer to water injector. It will be operated as part of the Prudhoe Bay Waterflood Project. RECEIVED JUL 1 6 ]984 Alaska 0il & 6as Cons. C0mrnissi0~ Anchorage 14. I hereby c,¢~tify that the foregoing is true and correct to the best of my kno.wledge. // Regional Engineer The space below for Commission use Date Conditions of Approval, if any: ORI6INAL SIGt't£D Approved by. COMMISSIONER Approved Copy R®turned By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Bill Sheffield, Governor ALASKA OIL AND GAS CONS£RVATIO~V COMMISSIO# November 21, 1983 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA 99501 '-3'! 9 2 TELEPHONE(907) 279-1433 A D M I N I S T R A T I V E A P P R O V A L NO. 165.6 Re: The application of ARCO Alaska, Inc., Eastern Area Operator, Prudhoe Bay Unit, to substitute Prudhoe Bay Unit Wells 6-8, 4-1, and 1-t0 for current key Wells 1-8, 4-13, and 5-7 in the Gas-Oil-Contact (GOC) monitoring key well program. Mr. D. F. S cheve Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510 Dear Mr. Scheve: The referenced application was received on November 9, 1983 and stated that wells 1-8, 4-13, and 5-7 would no longer be suitable for GOC monitoring. Wells 1-8 and 4-13 are scheduled for con- version to water injection and 5-7 has recently undergone mechan- ical changes rendering it unacceptable for GOC monitoring. Our studies indicate the selection of Wells 6-8, 4-1, and 1-10 as suitable for continued monitoring of gas-oil-contact move- ment. The well substitutions will not cause undue problems and appears to be a prudent action. The Alaska Oil and Gas Conservation Commission hereby authorizes the substitution of Prudhoe Bay Unit Wells 6-8, 4-1, and 1-10 for Prudhoe.Bay Unit Wells 1-8, 4-13, and 5-7 in the Gas-Oil- Contact Monitoring program, pursuant to Rule 9(c) of Conservation Order No. 165. Yours very truly, Commi s s ioner BY ORDER OF THE COMHISSION lc ARCO, Alaska, Inc. ? Post Office 360 Anchorage, Alas~,a 99510 Telephone 907 277 .5637 June 10, 1983 Reference: Arco Cased Hole Finals D.S. 1-8 4-18-83 CH CNL Run 6 5" ~ D.S. 1-24~? 2-4-83 PLS/Temperature Run 1 5" ~ D.S. 5-11 4-17-83 EPL Run 1 5" .... D.S. 5-11~ 4-17-83 PAL Run 1 5" D.S. 6-17,_, 2-11-83 PLS/TemDerature Run 1 5" , D.S. 7-20~ 2-13-83 ACBL/VDL/GR/Sig Run 1 5" ~ D.S. 9-4'~' 4-17-83 CH CNL Run 7 5" ~--9.S. 11-6~ 4-22-83 CFS Run 1 5" D.S. 12-17/' 2-3-83 ACBL/VDL/GR/Sig Run 1 5" ~,-D.S. 14-13/~ 4-25-83 EPL Run 1 5" Sch DA Sch Sch DA DA Sch GO DA Sch Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. ~ 368 DISTRIBUTION -:"-SOHIO!,,.' MARATHON ROBIL J DALLAS CAROLINE SMITH ARCO ,Ataske~, Pos! Ollice Bc,. 360 Anchorage. Alaska 99510 Telephone 90?' 277 5637 May 11,1983 Reference: Arco Magnetic Tapes and Listings ~ D.S. 7-25 ~ 4-24-83 OH tape w/List Run 1 Sch #68216 ~ ~4-24-83 RFT Pre-Edit w/List Run 1 Sch ~68216 ~D.S. 2-6----- 4-14-83 CH CNL w/List Run 4 Sch #68214 ~D S 5-7/ 4-14-83 CH CNL w/List Run 10 Sch #68215 ~D.S. 9-4v 4-17-83 CH CNL w/List Run 7 Sch #68201 D.S. 1-8/ 4-18-83 CH CNL w/List Run 6 Sch #68200 · D S 7-26/ 4-8-83 OH w/List Run 1 Sch #68176 ~D.S. 6~3/ 4-13-83 CH CNL w/List Run 1 Sch #68213 D.S. 7-14,,~ 4-22-83 CN/MSN w/List DA #1689 D.S. 4-13~,- 4-23-83 CN/MSN w/List DA #1690 ~/Please sign and return the attached copy as receipt of data. Kelly McFarland AFA-403 Trans. # 336 NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL STATE OF ALASKA' DALLAS !"~ ,/' CAROLINE SMITH ARCO Alaska, Inc. Post Office B,.. 360 Anchorage, Alaska 99510 Telephone 907 277 5637 November 23, 1982 RE: ARCO Cased Hole Finals D.S. 1-8 10-24-82 CH CNL D.S. 1-22~ 11-6-82 CBL/VD D.S. 4-1~ 10-30-82 CH CNL D.S. 5-7f' 10-26/5-14/10-22-82 CNL Gas Monitor Log D.S. 5-7~' 10-22/5-14-82 CNL Gas Monitor Log D.S, 5-7~ 10-22-82 13,S. 5-14~ 10-30-82 D,S. 5-12 .... 10-23-82 D.S. 6-23 ~ 10-21-82 D.S. 6-24~ 11-4-82 D.So 13-5J 8-20/11-1-82 D.S. 13-15~ 10-21-82 Run 5 SCH Run 1 SCH Run 6 SCH Run 3, 10, & 11 SCH Run 10 & 11 SCH CH CNL Run ll SCH CH CNL Run 3 SCH CH CNL Run 7 SCH ACBL Run 1 D/A CBL/VD Run 1 SCH CH CNL (CNL Monitor Overlay) Run 1 & 2 SCH CBL/VD Run 1 SCH ACBL Run 1 D/A Spinner Camco ACBL Run 1 D/A Please sign and return the attached copy as receipt of data. Becky Benedi ct AFA- 403 Trans. #625 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE OF ALAS~.~ DALLAS ...... ARCO Alaska, inc. Post Office · 360 Anchorage. ~,ska 99510 Telephone 907 277 5637 NOvember 3, 1982 Reference· ARCO Magnetic Tapes.with Listings D.S 5-12 '~10' 23 82 D.S. 1,8/x 10'24-82 D.S 18-10 ~1;-18-82 D.S. 5-7/ 10-22-82 D.S. 1-21 10-15-82 Cased Hole CNL Mag Tape #ACC 65764 · Cased Hole CN[" Mag Tape #ACC 65763 Open Hole ' Mag Tape #65734 cased Hole CNL Mag Tape #ACC 65762 DIFL-BHC/AL-CN/CDL Mag Tape #ECC 1489 Run 7 SCH . . Run 5 SCH Run 1 & 2 SCH Run 11 SCH D/A Pleasesign and retrun the attached copy as receipt of data. Becky Benedict AFA- 403 Trans. #587 DISTRIBUTION NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEV O ::~ i~:'!i: ~: ' : ARCO Alaska, Inc. is · Subsidiary of AllenticRichfieldComDan¥ EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS NOV 0 Alaska O'il & Gas Cons. Anchorage ARCO Alaska, Inc Post Office, 360 Anchorage/ ska 99510 Telephone 90Z 277 5637 October 6, 1982 Reference: Typographical error On 4-23-82 there was a Bridge Plug Tie In Log run on D.S. 1-8o. It has just been brought to.my attention that it was not well 1-8, ~but was 1-18. It was run by Gearhart and was a run one. If you have any questions, please call me at 263-4232° e sign and return the attached copy as receipt of memo. Kelly McFar!and , AFA-403 Transo # 530 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON GETTY D&M GEOLOGY STATE OF ALASKA · ',,',: ~,llice Lf, o,,, ~,.;.. Anchorage. Ala,-'-99510 Telephone 907 5637 July 8, 19 82 Reference: ARCO CASED HOLE FINAL LOGS D.S.7-7 ~ 5/16/82 D. S. 7-7,/" 5/16/82 D.S.5-12 ~/'5/15/82 DS.. 14-17~'" 5/16/82 D.S.9-4,~/ 5/15/82 D.S 5-7 5/14/82. DS..2-22 ~5/12/82 DS..15-5~/5/7/82 EPL(PAL LOG) Run 1 5" EPL(ETT LOG) Run 1 5" CNL Run 1 5" CBL/VD Run 1 5" CNL Run 5 5" CNL Run 10 5" CNL Run 10 5" CNL Run 1 5" Run 4 5" Run 1 5" S.r, 1-8 5/12/82 CNL '; S. 2-22~/ 5/15/82 CNL - ease sSgn and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 253 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY a,STATE?'OF "ALASKA" '-" C 7 .. ARGO Ai~s~a, Inc. , Post Office B ..... ~,60 Anchorage, .~ :a 99510 Telephone 90'/ Z77 5637 ,May 24, 1982 Reference: ARCO MAGNETIC TAPES & LISTS D.S.5-7/ ~.D. So t-8~'/ D.S.5-5 · D.S.15-5 D.S.2-22j 5/14/82 Tape # 65100 5/12/82 Tape # 65076 5/13/82 Tape # 65077 5/7/82 Tape # 65067 5/15/82 Tape # 65073 Please sign and return the attached copy as receipt of data. Mary Fo Kellis North Engineering Transmittal # 184 DISTRIBUTION NORTH GEOLOGY R&D DRILLING SOH. IO:?' · HARATHON CHEVRON MOBIL GETTY D&M GEOLOGY ". -.',.¢~-.4~:.~o~ ,:, AL~s~ .~ ~"~- , ~.~..,. ,~ ,:,,,~' ~.~ · , ~ ~_ ~, ,, ~. Telephone c. 0' -~'"7 5637 May 17, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.2-2t D S. 12-14"' 4/29/82 D.S.13-18 / 4/30/82 D.S.14-gB- .... "3/8/82 D. S. 14-9B ~" 4/21/82 D. S. 14-28.- _3/22/82 D S.14-29 /3/12/82 D.S.15-3 3/23/82 D.S.15-4~" 4/22/82 D. S. 15-14 ~// 12/25/81 D S.15-14/ 12/25/81 D.S.i6-14/ 3/18/82 D. S. 17-10 ~'-' 4/7/82 D.S.14=30 .... 5/8/82 D.S.14-5 .... ' 5/8&9/82 ACBL/VDL/GR Run 1 5" PLS Run 1 5" ACBL/VDL/GR Run 1 5" C.A.T. Log Run 1 5" Gamma Ray Neutron Run 1 5" CBL'/VDL Run 1 5" C.A.T. Log Run 1 5" CBL/VD Run 1 5" ACBL/VDL/GR Run 1 5" Collar for Gyro Correlation Run 1 2"/5" CNL/GR Run 1 2"/5" Perf Record W/CCL Run 1 5"/2" PLS Run 1 5" Collar Log Run 1 5" Collar Log for Tattle Tale thru Tubing Vented Bridge Plug Run 1 5' D.S.14-29?' 5/8/82 Collar & Perf Log Run 2 5" D.S. 1-..8/ 4/24/82 Diff Temp Log Run 1 5" ~~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 170 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXObI MOBIL GETT~ D&M GEOLOGY · STATE OF A:.t_,',a Ill c~ '. .......... Anchorage. ,2 'la 99510 Telephone SC .,'7 5637 May 13, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S. 14-30 D.S.1-8 D.S.17-7 D.S.17-7 5/4/82 4/23/82 4/28/82 4/30/82 Collar & Perforating Log Bridge Plug Tie In Flow Survey Collar & Perforating Log Run 1 Run Run 1 Run 1 se sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal YJ 161 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Oil and Ga,~. .npany North Alasko Dislrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5,637 Jerry A. Rochon District Operations Engineer November 13, 1981 Reference: ARCO CASED HOLE FINALS D.S.i-'8' 10/18/81 CNL D.S.2-10/ 9/26/81 Spinner D.S.2-14'~/ 10/14/81 EPL D.So5-5'-/ 10117181 CML D,So5-7 10116181 CNn D.S.5-12~ 10/17/81 CNL DoSo6-3 ~ 9/29/81 Spinner · DOS.6-3 ~ 10/16/81 CNL DoSo9-4 ~' 10/18/81 CNL D.S.14-4 ~ 10/24/81 CBL/VD D.S.17-5 '// 10/7/81 TDT Run 6 5" 5~ Run 1 5" Run 3 5" Run 7 5" Run 5 5" 5~ Run 5 5" Run 3 5" Run 1 5" Run 1 5" Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #741 DISTRIBUTION NORTH GEOLOGY R & D DRILLING ENG. MANAGER D & M GEOLOGY STATE OF ALASKA EXXON MOBIL SOHI0 F. iOV j F: i"" ~ MARATHON CHEVRON ~' ':~'::~_~r?:::. ARCO 0~1 3nd Gas Co,npan~, ~s ~ Oiv~sign of Alla~H,cR~chtJeldCompany ARCO Oil and Gar .npany North Alask~ District Post Otfice Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 13, 1981 Reference: ARCO Magnetic Tapes & Listings D.S.1-8 10/18/81 Tape #62242 DOS.5-5 10/17/81 Tape #62237 D.S.5-12 10/17/81 Tape #62240 D.S.15-12 11/1/81 Tape #62270 Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #740 DISIRIBUIION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL ,, ..... ~ .. GETTY" PHILLIPS SOH I 0 ~"-:': ':.: :.',~ ~ ::.,."~, ~':' "~' '..'~'~~ ' MARATHON ...... " , '-'L'// 'Z, . ' "".2. ' ' - CHEVRON '" A~CO Od and (_;as Company ~s a DIv~S~Qn of At~lnhcRichlleldCompany ARCO Oil and Gas ,npany North Alaska ,District Post OflJce Box 360 Anchorage. AMska 99510 Telephone 907 277 5637 derry A. IRochen District Operations Engineer June 19. 1981 Reference; ARCO Cased Hole Finals D.S. 1-8 4-22-81 CNL run 2 D.S. 5-1 4-25-81 CNL 5"//~/' DoS. 5-1 4-25-81 CCL/Perf record D.S. 5-7 4-22-81 CNL run 6 D.S. 5-10 4-26-81 Gamma Ray D.S. 5-14 4-8-81 EPL run 2 /- .. run I run 1 (since workover) D.S. 16-12 4-10-81 CNL run 1 5" D.S. 16-12 4-11-81 Perforating Depth Control run 1 D.S. 17-7 6-4-81 CNL run 1 5" ~, z.., . . , . . I co~,;.~)._~_ I co~__ I 1GEOL ~'~'~i~O~ __ I 3 G~.~OL .... i STA~ T~'C--' ..... HI_F: 1! ~./' ~//' Please sign and return the attached copy as receipt of data. Kelly McFarland North Engineering Tr~nsmittal~J 365 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO Od and Gas Company is a Division of AllanlicFhchlielclC~mnnnu ARCO Oil and Gas. Company North Alas; istrict Post Office .x 360 Anchorage, At3ska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer May 28, 1981 Reference: ARCO ,MAGNETIC TAPES & LISTINGS D.S.16-12 Tape //61615 4/10/81 D.S.14-18 Tape ~61632 5/5/81 ?~:D?:S7'1'~8'*'' Tape J¢61564 4/22/81 'D.S.9-4 Tape ~61617 4/11/81 Schlunberger Please sign and return the attached copy as receipt of data. Mary Fo Kellis North Engineering DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON "~¢"~ l)ii & (]aS (]t);/S. ~'OillliliSSiOp Anchorage, ARCO 011 and Oas Company is a Oiv,s,on ol Allanl,cRichlieldCompany ARCO Oil and Gas~.~ompany North Alas )istrict Post Of#icc Jx 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A, Rochon District Operations Engineer November 12, 1980 Reference: ARCO Magnetic Tapes · D.S. 6-3j 10/6/80 D.S. 5-5 i0/5/80 ~;~'~; 1-8 .... ~10/3/80 D.S. 5-?~io'/~/8o D.~. 5-1~o/~/8o Tape #61053 Run 3 .Tape #61056 Run 5 Tape #61047 Run 2 Tape #61052 Run 5 Tape #61050 Run 4 ' P~le~Se sign and return the attached copy a.s receipt of data. Mary Kellis North Engineering Transmittal #796 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ,~-~.~ ?.. ~.:~b~ ~i~¢~ 5~ ~~- . , ~ ~d,:-~ ,. , ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany ARCO Oil and Ga~"~,mpany North Alas' Jist rict Post Office ,_,ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 7, 1980 Reference: Arco Cased Hole Finals p.s. 1-8 10/3/80 CN.T_, Run 2 5" lq c°~~J~r i-i' I~-~-"~---~w -t ~ 3 EN:.5 J 4 ENG ~ I O~OL --r'-~ ~~ I s ~ STAT TEC 1 CONFER: .... FILF~ sign and return the attached copy as receipt of data. . Mary F. Kellis North Engineering Transmittal #782 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Oil and Gas Company is a Division of AltanticRichfieldCompany ARCO Oil and Gas~3mpany -\nc,':orar:o. Alaska 99510 T.:lor)hon(: ']07 277 5637 August 9, 1980 Reference: ARCO Magnetic Tapes ~ 5/14/80 D.S. 2-9 1/22/80 D.S. 3-17 7/16/80 D.S. 5-7 5/16/80 D.S. 5-12 5/16/80 Tape #60477 Tape #60213 Tape #CNLOG 7990-9550 Tape #60501 Tape #60503 ,,~lease sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TRANSMITTAL #540 DISTRIBLTION North Geology Exxon R & D Mobil Drilling Getty Eng. Manager Phillips -D & M Sohio Geology ~rathon State of Alaska Chevron ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany ARCO Oil and G~ ,mpany Al~s~ 1~ Pos! Office ~3ox 360 Anchorage. Alaska 99510 Te!ephone 907 277 5637 June 20, 1980 Reference: ARCO Cased Hole Logs 1-8 '~ 5/14/80 ........... 6/1/8o D.S. 2-6 5/30/80 D.S. 2-10 5/31/80 D.S. 4-9 CNL 5" Caliper Run 1 5" " Run 1 5" Caliper Run 1 5" 10/3/78 .-~:Fluid Density Run 1 5" .. Please sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TRANSMITTAL #409 DISTRIBL~ION North Geology Drilling Bng. Manager D ~ M Geology State o£Alaska Mob i 1 Getty Phillips Sohio Marathon ~o~ ARCO Oil and Gas Company ~s ~] Oi,,'is:on of AtlanticRichfietdCompany ARCO Oil and Gas ~mpany .... - .... December 11, 1979 Reference' Enclosed are Magnetic Tapes for the following ARCO wells' ~1-_~ 10/27/79 Tape #57073 Schlumberger ~ 10/30/79 Tape # 57075 " D.~.. 5-12 10/Z7/79 Tape # 57074 " ~~Please sign and return the attached copy as receipt of data, K. J~ S~).lstrom North Engineering T~kNSMITTAL # 513 ~ . T DISTRIBL~FION North Geology R & D I~illing Eng. Manager Geo].ogy State of Al. aska ]] ..~DC on Mobil Getty Ph 5.11 ip s Sohio ~.larathon Chevron North Post Of~ic~ Anchora2e, A~a~ka 925-10 Telephone 907 277 5537 November 26, 1979 Reference: Enclosed are Cased Hole Logs for the following ARCO wells: ""'D.S. 1-8 ) 10/27/79 CNL Run I S" D.S,'"'i-.12 10/25/79 " 'Run 1 5" " " " EPL Run 1 5" D.S. 2~1 10/27/79 CNL .Run 3 5': D.S. 4.-7 10/30/79 " Run 3 5" D..S. 5-5 10/26/79 " Rk~n 3 5'7 D.S. 5~7 10/26/79 " Run 3 5': D.S. 5-12 10/27/79 " Rrm 2 5" D.S. 6~3 10/29/79 " 5" D.S/-9-4 10/29/79 OWL Run 2 5" ~/Please sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TRANSMITTAL # 487 DISTRIBUTION North Geology Drilling Eng. btanager R&D Geology State of Alaska Exxon Mobil Getty Sd~io ~rathon ~]illips Chevron Post Ofiice .-3ox 380 Anchora- '~Iaska 99510 Telephc 997 277 5637 September 20, 1979 Reference' Enclosed are Cased Hole Logs for the following ARCO wells' D.S 1-4'¢' 4/21/79 D.S. 5-11 6/12/79 NGI #11,/ S/6-7/79 ~.S. 1-~ 6/2/79 Spinner '~§ c/ ref 5/28/79 Spinner D.S. 5-5 ~/ 6/19/79 Spi~er D.S. 5-6/ 6/25/79 " 7-7¢' 7/z/Tp ,, Collar Log Run 4 5" Perforating Depth Control Run 1 tt Please sign and return the attached copy as re.ceipt of data. 1: Very truly yoUrs, K. J. Sahlstrom North Engineering TRANS'_'~I~AL # 353 l) I ST'RI B{Yi' I OX North Geology D:i].ling ]lng. Manager State of Alaska ~ lob i 1 Cetty Sohio Marathon Ph :i. 11 Chevron T R A N S H I 'J' '1' A ], J, A'. P, ochon/P,. A. l,og,.~e ~'a~;:;,~i[:l(..d },.erewith are the :[ollowi~'~..i,~ fox' the subject ¥:ell' Seale Xerox "' Svp-~a 'BL Line Acid or Fracture Treatment Log · '- ' Be.imf.. & Flow Profile Sunrey l:orehole Geometry.Log Carbon ~<)'gen Log . Casing Collar Log Cement Bong Log Compensated Neutron L6g - Casecl I lole Core Analysis - Interval Core No. .............. _ Core Description (~xlC)- Interval . Core Description (Conv~) - Core No. .......... I)J_re~t~om.1 SurlrFy Gyro . - Single Shot - ~fltishot _ .... /. ...... ' ]i~g~neering Production- Log ... " Fluid Analysis - ........ ~ ..... :Fluid Density . Gamma Ray Location Plat Monthly Ifell Test Data Mud Log Perforating Record State Reservoir Pressure Report .......... Surveillance Reports Temperature Log Transient Pressure Surx~eys TVI-) Logs - ~el Induction Laterolog - Compensated Formation l)ensity Log - Compensated Neu-tron-Fomation Density - Lox ehole Compens~ ccc Sonic - Porosity I.og ~.:c(::ip'[: Ack~lowledged By' __ T) ' .... lease Re'tt~rn ]}ec:eJ_pt.To' Ms. R. A. Logue Atlantic Rich[ield Co:npc,ny P. O. Box 360 Ancl~orage, Ala~dca 995'1.0 Date' Atlant~c.RichfieldCompany North Ame~:~:''' Producing Division North A~a,, . ~trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 13, 1978 Mr. Hoyle H. Hamilton State of AlaSka Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' ~(33-4-10-15) ~~t No. 75-26 DS 1-9 (31-9-10-15) Permit No. 75-36 DS 1-10 (13-8-10-15) Permit No. 75-43 DS 5-10 (14-32-11-15) Permit No. 77-45 Dear Sir- Enclosed please find a Completion wells. Very truly yours, "Frank M. Brown District Drilling En'gineer /am Attachments Report for the a bove-men t i oned }"~l':ll [) 7 SUBMIT IN DL /~,CATE* STATE OF ALASKA reverse OIL AND GAS CONSERVATION COSMITTEE i i i WELk COMPLETION OR RECOMPLETION REPORT AND LOG WELL W ELL b. TYP~ OF COMPLE~ON: BACK ~ESVR. OV ER W E I, l, 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360; Anchorage, Alaska 99510 4. LOC~TmS oF WELL ('Report location clearly and in accordance with auy State requirements)* At surface 1078'FNL & 1517'FWL of Sec. 8, T10N, R15E, UM At top prod. interval reported below 1515'FSL & 1800'FEL of Sec. 4, T10N, R15E, UM At total depth 1540'FSL & ll05'FEI_ of Sec. 4, T10N, R15E, UM l~' °"~ s"u~°~ [~' °~'~' ~'°' ~c'~'° }~: '~=z c°~ sUS~ °~ ^~^~'6-4-75 7-6-75 7-22-75 TOTAL DEPTH. NLD & TVD [19. PLUG, )BACK MD & TVD~20. IF 1Vt-ULTIPLIg COiVLPL., 13550' MD(9137'TVD)I 13530' MD(9125'TVD)1 e 5. API NU2VIflRlt2CAL CODE 50-029-20160 6. LEASE DESIGNATION A~ND SERIAL NO. ADL 28328 -7. IF IND1A2q, ALLOTTEE OR TI{IBE NAi~LE 8, UNIT,FA/AM OR LEbkSE NAME Prudhoe Bay Unit 9. WELL NO. DS 1-8 (33-4-10-15) 10.~FiEI_~, A_ND POOL, ~ruanoe ua~ 'gi~'l'8~ Prudhoe 0~ Dool 11. SEC., T., R., M., (BOTTOM HOLE OBd EC~i'IV E) Sec. 4, Il0, R15E, UM 12. P~R2ViIT NO. 75-26 ! t16. F_,LEVATIONS tDF. }{liB. I%T, GR, ~L~i'C)* ~17. ELEV. CAS1NGtIEAD ! 33.4 ~R 39,3 Pad 72' 21. INTERVALS I)alLI,ED BY ,o~,. ~oATl '[ ~- ~"~None ,23. WAS DIRECTIONAL 22, PRODUCING INTERVAL(S), OF THIS CO'IVIPLETION--TOiP, BOTTOM, NAME (MD AND TV-D)* 12684'MD (8623'TVD) Top SadlerochSt 13512'MD (9115'TVD) Btm Sadlerochit 24. TYPE ELECTRIC AND OTHER LOGS I~UN SUHVEY MADE Yes- DIL, Sonic/GR/Density, CBL ! CJASING I~ECORD (~eport all strings set in weld 20" [ 94# IH-40 i 100'+ 13-3/8" [ 72# ~JN-80 I 2674'- 9-5/8!, 47# : 'NN:80L | 119~0' & 0'0-9s [ .... LINE~ I~E C O Pal) 26. S!ZD ~ TOP(fID) } EOTTOA'I (,MD) l SACKS CEMENT* Zl' ' ' f I t 00, ~ ' V SiZe and number) ~. PERFORATIONS OPF2N TO PRODUCTION (interval, 13,370'-13,385' 'I3,280'- 13,290' ./i3,200'-13,225' 7"~' 13,160'-13,185' w/4 shots per ft. HOLE SIZE ] CEMENTING RECOIIJ:~ i ?tMOUNT PULLED 2',1 ' :' ' ' 17~.1/2"16400~ax,. PF I T~ cm~_ . 12rl/4'115~0 sX.class 6 cmt .... [ 125 sx pF II 2nd st~. . ........ SCi-iE~ iReD) SIZE DEP'i'I-I SET (MD) PACIiEI{ SET (MD) 5-1/,~" 11,568' 11,433' ,. _ 29. ACID, Si:OT, 1,'llASYIGRE, C~,iEX'[' SQU~UZE, ETC. 30. PRODUCTION '~XT'F, Fi~%~t~ I~1%©DUC2~l(~ I r~ODUGTION '(~.a r~ h,:. :!977 ............ ~ Flowing D~TE OF TEST, ~OURS 2"ES~i'~ ' ' ]Ct~OXE SIZE 6-24-77 20 H~s. I~o~,~ Fo~ 1380 87/64 FLO~V, ~TEING UA~I2qG PRESSUR~ [CkLC~T~ OI~BBL. m~S ~ l,~-~ou~ ~T~ [ 12509 31. DISPOSITION OF GAS (So~d, u~ed for Iud, vented, etc.) Re~n~ected .... 32, LIST OF ATTACHMENTS DFIPT[[i IN'TE~RVAL (MD) ASJOUNf .~kND l'Llb,'l) C)I" R]A,'ZE;IiAL USED N/A :/ i '"" (Fiowh, g, gas lift, pun-,ping--size and type of p~nP.~i( , {. OIL-IABL. 1042.4 GAS--MCF. 19524 ~.. V,,?;LI.. [;'[ATUS I Producing or ,.;':;'":'~'"~' ProdUcing G. AS--lx, IC'F. V(.;/fER--/3BL. ] G21S-OIL [12~TIO i 793.6 ] 325 ] 761 ~ 39~ 270 AP I I TEST WITNESSED BY :--'~'3'. I hereby certify that the foregoing and attached information is complete and correci as determined from all-available rcc,rds SIGNEt TITLE DATI'; ................ . i~ i i i iii *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion reporl and log on all types of lands and leases in Alaska~ item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in other spaces on this forn~ and in any attachr~'~ents. Items 20, and 22:: If this well is completed for separate prczduction fror.'n more tha.n or~e interval :,one (multiple completion), so state ~n item 20, ,]nd in item 22 show the prcJuci~.0 interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in iten~ 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, show- ing the ac,4ditional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoul.J show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced, (See instruction for items 20 and 22 above). 34. su'MM'AIt~ OF FORMATI6N T~'I'S IN('I. UDIN(; INTERVAL T~TED, l'}~g~Si~'RE DATA ~ ~OV~Hl~ OF OIL, GAS, 35. G~GIC M A R~K~ WAT~ AND MUD _ . NAME Sag River Sand 12,517' 8520' Shublik 12,581' 8559' Sadlerochit Sand 12,684' 8623' Base Sadlerochit 13,512' 9115' 3B. ('O[IE DATA, A'I~'ACII 'BRIEF D~tPI~ONS O~ ~ITIIOLOGY, POROSITY, FRAc~RF~, APP~ ~IPS AND DE',t'EC'TEI) ~I~')WS OF OIL, GAS Olt WAT~I DEPAR~4ENT OF MAtC[~AL ~CES Division of Oil and (~s Con~tion O. K. Gl/broth, Jr February 9, 1978 D~ Hoyle H. ~amil~n' /~//r'/~ Chief Petroleum Engineer/v ~" Test Surface Safety Valves (F~V), Subsurface Safeby Valvas (SlaV), L~; Pressure Pilots and Dnm~lar Pressures on AF~0's Drill Sites #1, ~4 Subject test involved ~ separate trips to PruJhoe Bay, ~e first on January 16, 1978, and the second on January 22, 1978, with eight rive days spe~t testing. Part of the second trip was utilized retes%- ing cer~__a~n wells on drill site #1 after guidm lines were agreed upon at a n~a~ be~en agency and ARGO production peril ca J~uary 20~.%. Listed below are f]~e results of the tests: L.P.Pilot Initial SSV Act~nted F lc~ing Tested @ ~s~ Presmm~e _~ ps___im 1-1 720 1550 640 1-2 700 1270 675 1-3 700 790 620 , 1-4 660 1020 680 1-5 700 900 740 1-6 700 1550 800 ~ 700 1140 695 700 1140 740 1-9 700 1600 970 1-10 * 4-1 780 1400 700 4-2 2075 4-3 680 1300 750 4-4 775 1450 750 4-5 670 1560 700 4-6 . 700 1300 4-7 700 1500 775 4-8 700 1350 700 4-9 650 960 660 4-10 650 1450 700 * Not tested ** SSSV inoperable. Being'pulled. *** SSSSV would not close, SSV. SSSV SSSV 9 5/8" 13 3/8" Test Tested Test Annulas ;knnulas Results @ PSI P~sults PSI PSI OK 825 C~( 25 OK 720 OK, 0 C~ 660 Failed 0 C~( 700 OK 0 .. OK 700 OK 90 OK 810 GK 0 OK 650 Failed 60 OK 750 Failed 0 Failed 1000 Failed 0 ** In--able OK 700 OK 0 *** Failed 0 OK 750 OK 0 OK 750 OK 0 OK 890 OK 0 *** Failed 100 OK 700 OK 0 OK 760' Failed 0 OK 650 OK 100 C~{ *** F~iled 50 0 0 0 100 0 5O 0 0 100 0 250 0 0 0 0 0 0 0 ARCO D.S. %1, ~4 Februaz-f 9, 1978 Of the t~enty sssv's tested, nine, or 45%, %~_re inoperable or failed. Fifteen SSV's tested sucoessfully and one failed. Three SSV's %~re not tested after it ~o~s found the SSSV's in the %.~lls would, not test. 5~e three SSV's will be tested when SSSV's in these ~lls have -been ra~d. Field inspection reports ~,~_re prepared and copies n~l~! to A1 Brown, prod~c~ ~~lterzlent, and Don Frar~s, assistan% production sui~rintendent. Originals of ~e field ir~0ection re~ are attached to t2zis report. Atta~t Drlg. Permit No.~__ Opera tor ~~~ Ala~ 'Oil and Gas Conservation Commit~ Field I nspec~~.~port ~- Wel 1 / P~t~f~n Sec T _R____ Represented by~"~?~~ Name & Number ~.~' /-~ Satisfactory Type Inspection Yes No Item ( ) Location,General ( ) ( ) 1. Well Sign ( ) ( ) 2. General Housekeepinq ( ) ( ) ~. Reserve Pit-( )open'( )filled ( ) () 4. Rig (~7~'Safety Valve Tests (~ ( ) 5. Surface-No. Wells___/~ ( ) (~ 6. Subsurface-No. Wells ( ) Well Test Data ( ) ( ) 7. Well Nos. ,__,__, ( ) ( ) 8. Hrs. obser () () 9.~s&w , , ( ) ( ) 10. Gr. Bbls. ( ) Final Abandonment Satisfactory Type Inspection Yes No Item ( ) BOPE Tests () () () () () () () () () () () () () () () () () () () () () () () () () () 15 16 17 18 19 2O 21 "Casing set @~ TesL fluid-( )wtr. ~ )mud ( ) oil Master Hyd. Control Sys.- psig ~2 btl s .~, , , ~ns i g Remote Controls 'Drilling spool- "outlets Kill Line-( ) Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs flus~ 24. Chokes-( )Remote( )Po$.(-~dj. 25. Test Plug-( )Wellhd( )csg( )none 26. Annular Preventer,_~psi~Q 27. Blind Rams, psim ( ) ( ) 11. P&A Marker ( ) ( ) 28. Pipe Rams psiq ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock ~psig ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve _~Dsi~ ( ) ( ) 14. Pad leveled ( ) ( ) 31 Safety Floor valves--Z~- ~BV ( )Dart Total inspection observation'time~hrs/~ Total number leaks and/or equip, failures / Remarks cc'~ ~ Notify in days or when ready~ Inspected DRILL SITE #1-8 PERFORATE AND CLE~~ RECORD February 13-15, 1977 D.S. #1-8 was drilled to a bottom hole location in the southeast con, er of Section 4, T10N, R15E, Prudhoe Bay Field. Depths of interest are: Measured Depth Subsea Depth Zone Top of Sadlerochit Gas/Oil Contact Perforations Water/Oil Contact Base of Sadlerochit Junk Left in Hole 12684' 8551' 12713' 8569' 13160-13185' 8838-8853' 13200-13225' 8862-8877' 13280-13290' 8909-8915' 13370-13385' 8961-8970' 13487' 9029' 13512' 9043' None LBS LBS LBS LBS The first gun, 13370-13385', was fired with the well open to the surge tank on a 1/2" choke. Initial pressure was 50 psi at 2300 BPD. After 3 minutes the choke was opened to 3/4" resulting in no flowing wellhead pressure. After 30 minutes the rate leveled off between 800 and 900 BPD. Gas reached the surface 5 hours and 45 minutes after perforating and flowing approximately 230 bbls. 'IZe turbine meter was bypassed. When gas reached the surface, partial plugging of the choke occurred. The obstruc- tion was cleared by working the choke; no further plugging was encountered. Shake- outs showed no more than 36 percent calcium chloride water, indicating ~e calcium chloride water was som~vhat strung out in the tubing. After flm~ing a total of 717 bbls. in 21 hours, the well was shut-inwhen the water cut reached 0.2 percent. The final flowing wellhead pressure was 135 psi on a 3/4" choke with a temperature of 27°F. Final shut-in tubing pressure was 410 psi. An Amerada pressure bomb was run to obtain a bott~n hole fluid gradient. The results indicate that the calcium chloride water level was at 'approximately 13145' M.D., leaving 9 bbls. of water across the perforations. The three remaining intervals, 13160-13185', 13200-13225', 13280-13290', were shot after flowing the well on a 1/2" choke for 5 minutes. The flowing tubing pressure remained at 0 psi when 13280-13290' was shot. When 13200-13225' was shot, the flowing tubing pressure increased from 700 psi to 860 psi in 2 minutes. When 13160-13185' was shot, the flowing tubing pressure remained at 875 psi. No further testing was performed while perforating. Total estimated production was 720 bbls. oil and 540 MCF gas. JRM /13/77 · AtlantieRichfieldCompany North Amer'~'~ Producing Division North Alas . ~strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 April 28, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' D.S. 1-8 (33-4-10-15) Permit No. 75-76 Dear Sir: --- c. .........I - ~. -' 1 CONFLi~: FILE: Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure RECEIVED ~AY 12 l(tTf .. Form 10-403 REV. 1-10-73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to ~leepen Use "APPLICATION FOR PERMIT--" for such proposals.) ] GAS r-] 1. OwiELLL WELL OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3, ADDRESS OF OPERATOR P. O. Box 360, Anchorage, A1 aska 99510 4. LOCATION OF WELL At surface 1078' FNL & 1517' FWL Sec. 8, TION, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 72' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20160 6. LEASE DESIGNATION AND SERIAL NO. ADL 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. D.S. 1-8 (33-4-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 4, TION, R15E, UM 12. PERMIT NO. 75 - 76 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF [~ REPAIRING WELL FRACTURE TREATMENTH ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) Perforate (NOTE.. Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Began work on DS 1-8 @ 2230 hr on 2/10/77. Set in well house and installed & tstd surf equip. RU & tstd lubricator to 5000 psi OK. Pulled dummy valve. RIH & perf'd 4 shots per ft interval fromm370' to 13~385': Flowed well for clean up on choke sizes 32/64" - 4'8/64". Final flow press 123 psi on 48/64" choke. Perf'd 4 shots per ft intervals 13,280' - 13,290', 13,200' - 13,225' & 13,160' - 13,185'. RIH set ball valve in RQ nipple @ 2222'. Tstd control lines to 5000 psi. OK. Installed xmas tree cap & tstd to 5000 psi OK. Removed well house. Press tstd lower master valve. Released well to Production Department @ 2400 hrs 2/17/77. Note' A spinner and pressure buildup survey was run on 3/30/77. RECEIVED I AY 1 2 lti77 Division ef Oil and Gas , , 16. I hereby c~ifY that t, he foregol~_g~ is true and correct TITLE District Drilling Engineer DATE (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side To' ATL&NTI C RICHFIELD North Alaska District Engineering TRANSM I TTAL From: J.A. Rochon/P. Hellstrom Date' . ..... A. pr.il 12, 1977 Well Name: D. S. # 1-8 · Transmitted herewith are the following for the subject well: Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Lgg- _ BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL compensated Formation Den.s_i_.ty Log Compensate~ Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval ......... Core No. · . . Core Description (SWC) - 'Inter~ai'' . -'_ Core Description (Cony.) - Core No. ~ .... "... Directional SUrvey- Gyro . -., .- Singl~ shot '' ' ' Multishot m Drill Stem Test - Test No. Dual Induction Laterolog FomatiOn Density Log : ................. Formation Density Log/Gamma Ray · Ga,'ma Ray/CCL I' Laterolog. Location Plat .... , ,, ~crolaterolog .. Microlog 5~dlog- Interval Sample Log (A.R.Co.)-Inter~al) ..... Synergetic Log '/VD-DIL TVD-Porosity Log . , . Receipt Acknowledged For: Date: J. Please returni receipt to: Atlantic RiChfield Co.wpany North Alaska Engineering blanager P. O. Box 360 Anchoraoe_ Alaska _e_..~tO '# 210 .~ ~Atla~nti~RichfieldCompany North AmerP'-'- Producing Division North Alas .strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 28, 1977 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject- DS 1-8 (33-4-10-15) Permit No. 75-76 Dear Sir- Enclosed please find the Monthly Report of Drilling Operations for the above mentioned well. Sincerely, Frank M. Brown District Drilling Engineer /jw Enclosures N~'V. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT IN' DUPLICATE ^~;~ i~u~i~uc~u~ coDE 50-029-20160 6 LEASE DESIGNATION AND SERIAL NO. ADL 28328 wI;LL WELL 0THI~R 2. HA. ME OF OP]~%A.TOR 8. L.~IT, FA.r{A,I OR LEASE NAJ~E Atlantic Richfield Company Prudhoe Bay 3.' J{,DDRESS OF OPEP,~TOR 9.WELL NO P. O. Box 360, Anchorage, Alaska 99510 DS 1-8 (33-4-10-15) 4. LOCATION OF WELL "101 F~I]I~ A.,ND POOL. OR WILDCAT 1078' FNL & 1517' FWL sec. 8, T1ON, R15E, UM Prudhoe Ba~{- Sadlerochit Pool ~-,i. sec., f., R.', ML (BOih'6M HO~ ....... O~JECT~ Sec. 4, TION, RI5E, UM 12. PERMIT NO. 75-76 13. REPORT TOTAL DEPTI-I AT END OF MON~rI, CHA~CGES IN HOLE SIZE, CASING AND CL"ViENTING JOBS INCLUDING DEPTH SET AND VOLIT1VI'E~ USED, PER. FOP, MkTIONS, TF-.STS A.N-D IR.ESULTS. FISHING JO~. JU'N'K LN' HOLE A. ND SIDE-~CKED HOLE AJ'qD A.N'Y OTI4ER SIGNIFICA/XTT C'TH. AH~..ES I'N HOI~ CONDITIONS. Began work on DS 1-8 @ 2230 hr on 2/10/77. Set in well house and installed & tstd surf equipoRU & tstd lubricator to 5000 psi OK. Pulled dummy valve. RIH & perf'd 4 shots per ft interval from~l],3_,3_ZQO_' to 13~,385'. Flowed well for clean up on choke sizes 32/64" - 48/64". Final flow press 123 psi on 48/64" choke. Perf'd 4 shots per ft intervals 1~3,~L~-_]~,290'~ 13~200..'. .... ~ ]3,225' & 13,160 - 13,18 .. RIH set ball valve in RQ nipple @ 2~-~"~"~'~'~{d' COntrol lines to 5000 psi OK. Installed xmas tree cap & tstd to 5000 psi OK. Removed well house. Press tstd lower master valve. Released well to Pruduction Department @ 2400 hrs 2/17/77. 14. I hereby certify that the foregoin~,~is true and correct I II Ill I II II roll II Il I Il I Il I I I I ~I~ · J~ II II Ill l oil o.d gos conservotion ¢ommlf~ee by the 15th of ~he su~ce4ding month, unle~ otherwise directed. STATE of ALASKA DEPARTMENT OF ~.~TURAL RESOURCES Division of Oil and Gas Conservation To: [-- Hoyle H. Hami 1 ton/~~ Di rector Thru: Lonnie C. Smith ~...~/,~]/ Chief Petroleum Engineer~i LJ~) FROM: John C. ~li 1 let j~ Petroleum Engineer DATE : February 23, 1977 SUBJECT: Test Surface and Tuesday, February 15~ 1977 - I 'traveled to the North Slope to test operation '~f'hewly i'n's-tall~d Safe~tY-valves on the captioned Prudhoe Bay Field wells. I arrived at Deadhorse on the BP charter flight at 10:40 AM. I caught a ride to the BP Operations Center with Charlie Nark, BP lease superintendent, and met our inspector, Harold Hawkins. Harold brought me up to date on inspection activities on the slope. He had just finished testing SSSV on BP D-5 and was heading south on the 1:00 PM BP charter. We contacted Minos Hebert, drilling forem~n on Arco DS-1. They were stage perforating and flowing to clean-up DS 1-8 and DS 1-9 in prepara- tion to installing SSSV's. He expected testing to start tonight or in the morning. He dispatched drilling engineer, Hark Major, to pick me up. Harold and I had a quick lunch. Mark arrived and we drove to the Arco base camp while ~.~rk filled me in on progress and plans for wells |~o. 8 and No. 9 on Drill Site l. I checked into Arco Base Camp and waited for testing to start. At 3:00 PM Mark ~.~jor and I drove to DS-1 to check on progress and then to the NGI pad where NGI No. 7 was being flared to a pit to clean up the well in preparation to producing it to the Central Cm~.pressor Plant. Nearby, Arco was conducting tests on a smokeless burner. ~e. dnesday, February 16, 1~7_?_~, Ben Davis, Arco drilling foreman, called me a~'4:00 AM to'witneSs SSSV test on DS 1-8. Ben said the 5 1/2" SSSV was installed in the~-'5 1/2" tubing at 2222' in the closed position and ready to ble~ed, off pressure above it. I requested a test on the SCSV first, so it was cTosed with 925 psig below it. Pressure above was- bled to 115 Dsia and that p~bssure was observed for 15 minutes. The SCSV was opened an~l they attempted to bleed down the 925 psig surface tubing pressure. It would not bleed~f~, indicating the SSSV was not seated in the profile (seating nipple) DS 1-8 & DS 1-g February 23, lg77 The SSS¥ valve was pulled, the seals were redressed, and the valve was re-run, While this was being done, I visited the testing of the Noralco twin 17drner. The previous day they had burned used Arcttc-Pak with extra diesel mixed, in it. Today I watched the Noralco flare burn crude from DS 1 with 20~ aqueous CaCI2. it burned quite clearly, giving off a medium gray s~ke which apparently was mostly steam from the entrained and added wa~r. They were burning at a rate of 5 Bbl/min. To do this, the oil was pumped to the burner where it was mixed with 2.25 CFM of air and 1/4 Bbl water/min. The water cooled the fl~ and provided some~ 02 for combustion. The burner is ignited using a propane pilot which is electrically ignited. Another test was planned for the a f~rnoon. I returned to DS 1. The SSSV valve was again reportedly set in the profile but again it came out when closed and pressure was bled dorm above it. Again the SSS¥ was retrieved. I returned to watch Arco's Pete Vandussen~running the flare tests, attempt to burn a mixture of DS 1 crude and 50~ aqueous CaC12. They could not get tP~ mixture to ignite. Just west of the ~4oralco tes~, the Central Compressor Plant was being c~issioned and was flaring 15 to 18 MMCF/D of gas at their new 500 M[~CF/O emergency flare facility. I returned to DS 1 where progress was slow. I toured the new DS-1 manifold facility while ~rking tin~. The SSS¥ was on bottom again at 6:30 P~4. We bled pressure down above the valve starting at 1060 psig in three increments to 0 psig and observed the valve holding at each increment including 0 psig for 15 minutes, and observed control line pressure holding at 3000 psig. The test was completed at 8:45 The crew i~diately started moving the Schlumberger lubricator to DS 1-9 which was perforated, cleaned up, and ready for SSSV installation. Thursday_,_.~Februarg ]7, ]977 - ! was called at 12:45 AH to witness safety valve ~ests on os lJg.' ~TP~ 'SCSV was closed and 1200 pstg pressure above the valve was bled to 0 and observed for 15 minutes. The SCSV was opened and with the 5 1/2" SSSV at 2194' in the closed position~ ihe 1200 psig surface tubin~ pressure was bled to 200 psig in four increments and the valve was observed to be holding pressure below it for 15 minutes at each increment. The control line pressure held 3000 psig throughout the test which was completed at 2:45 A~4. I co~leted "Field Inspection Reports" for satisfac, tory SSSV & SCSV tests for DS 1-8 and DS 1-9 and left copies with Ben Davis. I made travel reservations at 8:t5 AH and then called on Lee Hoench, Arco gas processing superintendent. He made arrangements for me to see the DS 1-8 & DS 1-g 3~ February 23, 1977 Central Compressor Plant. I drove to the plant and was met by Bob Hodges, plant superintendent, and his assistant, Don Turner. Bob gave me a guided tour of the facility which was operating on about 20 MMCF/D of gas cap gas from NGI No. 6 at 3100 psig. Fuel is being provided to BP's Central Power Generation Plant. Compressors are being installed, so the 15 to 18 t4MCF/D of excess gas is being ~ared. Condensate is being injected into rlGI No. 8. I returned to the Arco camp in time for a quick lunch before catching the Arco airport bus. I departed ~adhorse on a conmmrcial aircraft at 1:00 and arrived at Anchorage at 2:50 I..n_summ_ary.: I witnessed the satisfactory operation of' subsurface and g'UrfaCe Safety valves on Arco's DS 1-8 and DS 1-9 wells. Appropriate "Field Inspection Reports" were left with Ben Davis at the wells, copies were sent to Bob Hines, Arco drilling superintendent in Anchorage, and copies are attached. Attachment ~'~ ~.?~.--~-~!?~i'~-','?..~.~ !~.,~'~ '!-ii~'~.'-~' Ala[ ?Oil-~'and Gas C°nservation C~Ommii~, Field Inspect-ion Report ~.~.Drl'g,~'~ Permi.t. NO~' ~ '~i~i~.--~ !~ ~': .... ~ '.~'~ - ~ ~'~ Wel 1/-P:~a~-fm Sec.~ T.~ R ~-~ U M Operator-~~o - ' ' .Represented by~ ~-v/~ Name & Number ~._~. J -~-- Satisfactory Type Inspection Yes No Item ( ) Location,General () () () () () () () () (~ () (~) () () () () () () () () () 1. Well Sign 2. General Housekeeping ~. Reserve Pit-( )open( )filled 4. Rig (~') Safety Valve Tests 5. Surface-No. Wells ! 6. Subsurface-No. Wells / ( ) Well Test Data 7. Well Nos. , , , ,8. Hrs. obser , , , -9. BS&W , , , 10. Gro Bbls. ( ) Final Abandonment Satisfactory Type Inspection Yes No Item ( ) BOPE Tests () () () () () () () () () () () () () () () () () () () () () () () () () () 15. "Casing set @ 16. Test fluid-( )wtr.--~ )mud ( ) oil 17. Master Hyd. Control Sys.- psig 18. N2 btls. , , , psig 19. Remote Control~ -- .20~ Drilling spool- "outlets 21. Kill Line-( ) Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs flos 24. Chokes-( )Remote( )POs ~(-~dj. 25. Test Pluo-( )Wellhd( )csg( )none 26. Annular Preventer,_ psi.o 27. Blind Rams, psio ( ) ( ) 11. P&A Marker ( ) ( ) 28. Pipe Rams __psiq ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock ~psig ( ) ( ) t3. Clean-up ( ) ( ) 30. Lower Kelly valve ___psi~ (). ( ) 14. Pad leveled ( ) ( ) 31 Safety Floor valves-( )BV ( )Dart Total~ inspection observation time /~ hrs/-da~ Total number leaks and/or equip, failures ~ Remarks Noi~ify in days or when' ready Inspected by~,.~An/v~;//t,r Date ~//~; ~ North Alask~-~strict Post OffiCe ~ 360 Anchorage, A~aska 99510 Telephone 907 277 5637 January 14, 1977 Mr. Hoyl e Hami 1 ton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 1-6 (13-4-10-15) Permit No. 75-13 ~,. DS 1:8~:~33-4-10-15) Permit No. 75-76 .... DS~'i~9 (31-9-10-15) Permit No 75-36 DS 1-10 (13-8-10-15) Permit No. 75-43 Dear Si r' Enclosed please fi nd a Sundry Notice outlining our perforating plans for each above-mentioned well. Very truly yours, F. M. Brown District Drilling Engineer CER/FMB/jw RECEIVED JAN 1. 9 197'7 l~ivlolofl of 0tl A G~ l~A~arv,m~n Enclosures Form 10-403 REV. 1-10-73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchora§e, Alaska 99510 4. LOCATION OF WELL At surface 1078' Sec. FNL & 1517'FWL 8, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 72' RKB · z4. Check Appropriate Box To Indicate Nature of Notice, Re -5. APl NUMERICAL CODE 50-029-20]60 6. LEASE DESIGNATION AND SERIAL NO. ADL - 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. DS 1-8 (33-4-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay-Sadlerochit Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 4, T10N, R15E, UM 12. PERMIT NO. 75-76 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF [.__.._j FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other)_ Perforate PULL OR ALTER CASING g.---J MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING ORACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent detalls, and give pertinent dates, including estimated date of starting any proposed work. Atlantic Richfield Company proposes to perforate the intervals as follows' 13370' - 13385'MD, 13280' - 13290'MD, 13200' - 13225'MD, 13160' - 13185'MD A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized· with all wireline work. All perforations will be made with 2-7/8" Hyperdome Guns at 4 shots per foot. Well will be flowed to a portable separator to recover load fluids and any produced well fluids. All recovered liquids will be flowed to on-site tankage, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. T-he downhole safety valve will be installed and tested upon conclusion of job. Spinner and pressure build-up data will be taken approximately 30 days after E Estimated start date' February 7, 1977. D 16. I hereby certify that the foregoing is true and correct T,TLE District Drilling En_qineer DATE. (This space for State office ~se) CONDITIONS ~AP~ROVAL, IF ANY: ' . ~ ~ / ~e Instructions On Reveme Side Refumed Cu, i ,trlDENT!AL DISTBIBUTED TO: STATE OF ALAS}Lt, DIViSiON OF OIL & GAS ATIJtNTIC RICHFIELD North Alaska DistrictEngzn~v~zn~' ==~' ~ TRANSMI TTAL From: J.A. Rochon/P. Hellstrom Date' Jan. 4, 1977 Well Name' D.S.# 1-8 Transmitted herewith are the following for the subject well' Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutror~ Log ( Cased Hole ) Core Analysis - Interval Core No. Core Description (SI?C) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot ~ltishot Drill Stem Test - Test No. Dual Induction Laterolog Fomation Density Log Formation Density Log/Gamma Ray G~mma Ray/CCL Laterolog Location Plat Microlaterolog Microlog Mudlog- Interval Sample Log (A.R.Co~.)-Interval) Synergetic Log TVD-DIL TVD-Porosit~ Log . Receipt Acknowledged For' Date' Please return receipt to' Dlvllion 'of ~11 lind ~t~i~ Conservation / / ' A~eher~o Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 # ].14 AtlanticP, ichfieldCompany North Amer'~-'' Producing Division North A~asl ~strict Post Office Bo× 360 Anchorage, Alaska 995'10 Telephone 907 277 5637 November l, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 1-8 (33-4-10-15) Permit No. 75-76 F. t ! :',: C t Dear Sir' Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above-mentioned well. Very truly yours, C. R. Knowles District Drilling Engineer /jw Enclosure F~'rm 10-403 REV. 1-10-,73 Submit "1 ntentions" in Triplicate & "Subsequent Reports,' in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) o,L IT! GAs i-"I WELL i~ I WELLi I OTHER · 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. O. Box 360, Anchoraqe, Alaska 4. LOCATION OF WELL At su trace 1078'FNL & 1517'FWL of Sec 8, TION, RI5E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 33.4 GR, 39.3 Pad Elevation, 72'RKB 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20160 6. LEASE DESIGNATION AND SERIAL NO. ADL 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. DS 1-8 {33-4-10-15) 10, FIELD AIXID POOL, OR WILDCAT Prudhoe BaS - Sadlerochit Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 4, TION~ R15E 12, PERMIT NO. 75-76 ~ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) Recompl eti on (NOTE; Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of start_lng any proposed work. Accepted rig @ 1700 hrs 10-17-76. NU & tstd BOPE. Unlanded tbg & pulled out of PBR. Displ diesel w/CaCl~ wtr. Pulled & LD 5½" Hydril pipe. Tstd 9-5/8" csg to 3000 psi OK. Replacedz& press tstd new 9-5/8" csg pk0ff to 5000 psi OF. PU 5" DP. RIH & engaged pkr asbly @ 11,377' POH. LD PBR & pkr. PU 6" bit & 7" csg scraper. RIH to 13,512'. Circ. POHi LD DP. Press tstd FO to 3000 psi OK. Chge & press tstd 5½" rams. Ran wireline junk basket & gauge ring. RU & ran 5½" 17#, L-80 LT&C ABC completion asbly w/4 jts 4½" 17# 12.6#, N-80 Butt tbg. Shear out sub @ 1, , 4½" X n pple @ , ] ,568' Otis i @ 1~ 502'. Baker Model SAB pkr ~ PBR @ 11,422 5½" Otis XN nipple @ 11,382 ; 5½" Otis XA sleeve @ 11,347-', 5½" Otis RQ nipple @ 2226'. Installed ball valve control lines to hgr. Tstd to 5000 psi OK. Landed hgr. Tstd ball valve control line nipples & hgr to 5000 psi OK. Pumped 4 bbls CaCI~ down tbg. ND BOPs. Installed & tstd xmas tree to 5000 psi OK. Pulled dum~ny valve. Dropped ~all & set pkr. Sheared @ 3150 psi. Press tstd w/200 psi on tbg & 2000 psi on anul OK. Tstd w/200 psi on anul & 3000 psi on tbg OK. Opened sliding sleeve & displ tbg w/273 bbls diesel. Closed sliding sleeve & press tstd OK. Ran CNL/GR/CCL log & dummy gun. Reset dummy valve. NU xmas tree. Started 48 hr press tst. Released rig .@ 1200 hrs 10-22-76. NOTE; Did not submit a Sundry Notice of Intentions as noted in conversation of Mr.. John Miller and Mr. Michael Waggoner on 10/22/76. 16. I hereby certify that the foregoing is true and correct (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY.. TITLE DATE See Instructions On Reverse Side ATL/~NTIC RIG{FIELD COt~\~f North Alaska District En'~ineering TRANSMITTAL Date' NOVE&4BER 7,1975 From' J.A. ROC~ION ARCO D.S.#1-8(8-10-15) lYell NamegRCO D.5.#1-4{23-5-10-15) Transmitted herewith are the £ollowing for the subject well' Run No. Scale - Xerox Sepia BI, Line 1 1-3 BHC Sonic/Caliper Log BHC Sonic/Caliper - Garmna Ray Log BHC Sonic - Gamma Ray Log Cement Bond Log Compensated Formation Density Log Compensated Neutron-Formation Density 2" _..~ S" Core Analysis - Interval ............ Core No. Core Description (~,'~C) -' 'Interval ............. Core Description (Cony.) - Core No. Directiona! Survey - Gyro Single Shot MultiShot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log' Formation Density Log - Gamma Ray Gamma Ray - Neutron Log Laterolog Location Plat Microlaterolog biicrolog b~adlog- Interval San~le Log (A.R.Co.-) - Interval Synergetic Log Borehole Geometry Log 5" Casin~ Collar Lo~ S" Temperature Log S" Thru Tubing Caliper S" Receipt Acknc~vledged For' Date' ! Please return receipt to: Atlantic Richfield Company North Alaska District Engineer P.O. Box 360 Anchorage, Alaska 99510 ATLANTIC RICHFIELD CO~Tn\~ North Alaska District- Engineering T RAN SM I T TA L To' State of Alaska From: J.A. Rochon/N. Sisler Date' Sept. 16~ 197.S, ...... Well Name' D. S. #1-8 (4-10-15) Transmitted herewith are the follm¢ing for the subject well' Run No. Scale Xerox 1 1. ]. 1 1 . BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC S6nic - Gan~na Ray Log :. Cement Bond Log uomp~nsa~.~d Formation Density Log Compensated Neutron-Formation Densi~ Core Analysis - Interval Core No. Core Description (~VC) - Interval Core Description (Con~.) - Core No. Directional Survey - Gyro .~..I0775G-21 Single Shot Mag.b~ltiShot Addco Drill Stem Test - Test No. P. ml Induction Laterolog !~o~n,..ation Density Log Formation Density Log - Gam~ma Ray Gmoma Ray - Neutron Log Laterolog Location Plat ?.!ic'rolaterolog Microlog. 3~dlog - Interval Sa.Tple Log (A.R.Co.) - Interval S>._~roet~c Log 1 GR/CCL 11 5f ! ll 511 $epia BL Line f L'/ sent previoUsly .. sent previously I 1: sent pr. evious ly I i Receipt Ackmc~,'ledged For' Date' Please return receipt to' Atlantic Richfield Company North Alaska District Engineer P.O. Box 360 Anchorage, :Alaska 99510 By: Atlan~icRichfieldCompany · North Am ~ Producing Division North Alas,¢,a ~)istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 22, 1975 Mr. O. K. Gilbreth State of Alaska Department of Natural Resources Oil and Gas Division 3001 Porcupine Drive Anchorage, Alaska 99504 Permit No. 75-26 Dear Sir' We are enclosing the Well Completion Report along with the Well 'History and Directional Survey for the above mentioned well. Sincerely, C. R. Knowles District Drilling Engineer CRK: aim Enclosures STATE OF ALASKA SUBMIT IN OIL AND GAS CONSERVATION COMMITTEE i ii i WELk COMPLETION OR RECOMPLETION REPORT AND LOG* w ELL W ELL DR f Other b. TYPE OF COMPLE~ON: W~:LL OVER ~ E~ BACK RESVR. Other ~ 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 4. LOC~'rlON OF wELL (Report location clearly and in accordance with any State requirements)* '~t su~bc58'FNL ~ 1517'FWL of Sec 8, T10N-R15E, tim At top prod. interval reported below 1515'FSL & 1800'FEL of Sec 4, T10N-R1SE, UM At total depth 1540' FSL & 1105'FEL of Sec 4, T10N-R15E API NU1ViF-~LICAL CODE 50-029-20160 6. LEASE DESIGNA'FiON A.ND SERLZkL NO. ADL 28328 7.IF INDiA~N, ALLOTTEE OR TRIBE NAJXIE 8.UNIT,FAILM Ot~. LEASE NAME Prudhoe Bay 9. WELL NO. DS 1-8 (33-4-10-15) 10. FIELD AND POOL, OR WILDCA. T Prudhoe Bay' ~Sadlerochit sec., T., R., ~:., (~OTTOM ~OLm Pool OLMECTIVE) Sec 4, T10N-R15E 12. PER2,IIT NO. 75-26 6-4-75 7-6-75 7-22-75 j33.4 GR 39.3 Pad 72'RKBJ [ lu~OWi%(LtkNY* [rOTARY TOOL.q ' '---- CABI,E TOOI.M 13550'MD (9137'T~) 13530'MD (9125' .T~). Single All None 22. PRODUCING INTERVAL(S), OF THIS CO,iVIPLJgTIO~--TO,P, BOTTOM, NA~viE (MD AND TV'D)* 23. ~VAS DIRECTIONAL 12684'MD (8623'TVD) Top Sadlerochit , 13512'MD (9115'TVD) Bottom Sadlerochit } Yes 24, TYPE ELF_CTRIC AND OTHtg~ LOGS RUN DIL, Sonic/GR/Density, CBL 25. CASING RECORD (Report all strings set in ,, !\VEIGFIT' LB' PT' ~ GI~kDI~ I D~PTH $F'T (AID) HOL1g SIZ~47#94'~72# ~N-80~N780~-40 /11960'.[ 2674 '[100' ~ . ' 12-1/417-1/232 [150016400 sxSXC~M~NTING RECOJ~ [ ~O.q'(>UNT PULLE~classPemafrostG ~t II .... ~t & [Sm-95[ ,[125 sx pF II second stagel 26 "' LINEX ~CO~ .... ] 27. TUBING RECO[~J) , /i ,,, 7" -- [11647' ' [ [ 700., '13550' ' I 5-1/z ] 11555' i 1 ....... I I ,'1 28. PERFORATIONS OP~ TO PRODUC~ON (interval size and number) 29. ACID, Si:OT, FiiA. 7'[ JRE. C~,iENT SQULI~Z2~, ETC. D~TIi 1X'I'~V.~ (MD) ] AMOUNF AND LAND OF , . ~ ,, C~kSI~fG SIZE 20" ...... 13-3/8" 30, Pl-lO DUCT! ON DATE FIRST PIKODUCTION [ pI~ODUCTION MEi[{O'D (Fiov:ii~g, gas lifi, pumping~size and type of pump~ [V, 1,;LL [YI'ATUS lProducing o,: ~ ~ Unoerfc,rated comnl eti or Ct{ONE SIZE Pt~OD'N FO~ OI~BDL. G:kS~AI. CF. ~V//I'E~BL. GAS-OIL II,%TIO TEST P~iL!OD ~5%V~%~ ~hW'~ PRESSURE ICALC~T~ OI~BBL. OAS--~CF. ' WA'I~R--BBL. [OIL GRAVITY-~I (CORR.) ~i~ ~'ION OF OAS (Sold, used ]or ]uel, vented, etc.) ' TEST WITNESSED BY 32'."LiST OF ATTACHMENTS Drilling History ~d G~o Survey '" 33.'I hereby certify that the foregoing and atiaehed information is complete and correct as determined from all-available r~:cords *(See Instructions and Spaces [or Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on ~11 types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise sho'wl9 for depth measure- ments given in other spaces on this form and in any attachmer~ts. Items 20, and 22:: If this well is completed for separate production from more than one ~r~terval zone (multiple completion), so state in item 20, and ir'~ item 22 show the prcJtJcir~,g interval, or ir~tervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, show- ing the ackJitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoul.d show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately producod. (See instruction for items 20 and 22 above). 34. SUMMAI~Y OF ~'OkMAT,ON TbTS INCLUDIN(i IN'IiEIIVAI- T~STED. PHE~URE DAT~ ~'~COVERI~ OF Oil, GAS. ' ........ WAT~ AND MUD NAM~ , ,, ,,, ,,, ,,, , ,,,, ,,,,,,, Sag River Sand 12,517 ' 8520 '. ShublSk 12,581 SadlerochSt Sand 12,684' 8625' Base Sadlerochit 13,512' 9115' 36 COI1E DATA. Aq'I'ACI[ BRIEF D~C~[PI~ONS OF LITIIOLOGY. POROSITY. FIIAC~R~. APP~ D~PS AND DE'I'ECq'EI) SiI(3WS OF OIL, GAS OR _ ......... Atlantic Richfield Company DS 1-8 (33-4-10-15) AP1 50-029-20160, ADL 28328, Permit No. 75--26 Drilling~ History Set 20" conductor @ 100'+. Spud @ 5 AM 6-4-75. Drilled 17-1/2" hole to 2700'. Ran 13-3/8" casing w/shoe set @ 2674'. Cemented w/6400 sx Permafrost II cmt Washed out 13-3/8" x 20" annulus, landed 13-3/8" csg, recemented annulus. C~t casing, set OCT head, tested packoff. NU and test BOPE. Drilled to 2710', tested formation to 0.65 psi/ft gradient. Directionally drilled 12-1/4" hole to 11985'. Ran 9-5/8" csg w/shoe @ 11960'. Cemented w/1500 sx Class G cmt. Installed and tested packoff. Cemented second stage w/125 sx Permafrost II cmt. RIH w/RTTS, washed 9-5/8" x 13-3/8" armulus w/475 bbls water, pumped 290 bbls Arctic Pack. Installed 5" rams and test BOPE. RIH w/8-1/2" BHA and drilled to 11995', tested formation to 0.62 psi/ft gradient. Drilled ahead to 13550'. Ran DIL, Sonic/GR/Density logs. Ran 7" liner w/shoe @ 13550' and top @ 11647'. Cemented w/700 sx Class G cement. Cleaned out cement to top of liner at 11647', tested lap to 3000 psi. Ran WSO test on liner lap okay. Ran 6" bit and scraper to 13530', POH. Ran cased hole logs. Reversed out mud w/water and checked well for flow. Reversed out water w/diesel, checked for flow. Installed 5-1/~2,' rams. Tested BOPE. Ran 5-1/2" tubing assembly w/4-1/2" tail- pipe w/shear sub @ 11555' and BOT Arctic RH-1 pkr @ 11,425'. Landed tubing and tested control lines. Pulled and reset dummy valve. Set BPV and ND BOPE. NU and test tree. Set packer and shear out PBR. ~ Sheared out ball seat. Ran dummy gun to 13530' PBD. Release Rig 9 AM 7-22-75. Well shut in. ,.~U~-~URF~CE D~RECT#G~f.~ J. Atlantic Richfield Co, mpan¥ COMPANY _Drill Si,,te, ,~ Well 8 WELL NAME Slo=eo , ....... ~ NO ~th LOCATION _JOB NUMBE R~ TYPE OF SURVEY, AMO775G-21 Gyroscopic ........ I II I 11 I DATE July 18, 1975 Raius of Curvature SURVEY BY OFFICE Alaska CC:¥'m~ =TI'~',' ~='gO~T ~'ORT'- SLOPE' D S 1 ~ AUGUST 11, ].975 _F.,,__~,_.£L='VATIO..",: 72 FT, GY~OS.~PLC SURVEY maDIU~ OF' _C ___. U_.....V~ T h: O_D OF "' RECORD OF SURVEY ALL CALCULATIONS mERFOR~ED BY I B ~ ELECTRONIC COMPUTER T~UE DOG LEG ~'_.."=~:~..$. DRIFT VERTICAL SUB DRIFT TOTAL CCOqDINATES .CLOSURES ._ S.EVERI TY SECTION DEPTH ANGLE DEPTH SEA DIREC DISTANCE ~,ANGLE DEG/IOOFT DISTANCE D ~ DEG. t'D M S 0 0 0 0,00 '~.72,00 SlO,OOW 7~7,00 S 142,00 E 780,03 S 10 29 1~ E 0,000 -~3,20 100 0 0 1CO,OO 28,00 SiO,OOW 767,00 S 142,00 E 780,0.~ S 10 29 19 E 0,000 -B3,20 __200' 0 0 200.00 128,0~. SIC,OOW 767,00 S 1~2,00 E 780,08 S 10 29 19 E 3,000 -~3,20 ~00 0 0 300,00 228,00 SlO,OOW 767,00 S !42,00 E 780,0~ S 10 29 19 E 0,000 -3~.20 .. 400 0 0 ~00,00 328,00 SIO,OOW 767,00 S 142,00 E 780,08 S 10 29 19 E 0.000 500 0 25 499,99 427,99 SIO,OOW 767e86 S 141,98 E 780,38 S 10 28 44 E Oe4BO -DB.B5 600 0 0 599e99 527,9.9 SB6,00E 767172 S 142,01 E 780,75 S 10 28 $9 E 0,430 700 0 0 699,99 627,99 SB6.00E 767,72 S la2eO1 E 780e75 S 10 28 49 E' O,OOO 800 0 20 799,9~ 727,99 536,00E 767,96 S 142.19 E 781,01 S 10 29 22 5 0,340 900 0 25 899,99 827,99 SB~,00E 768,49 S 142,60 E 781,61S 10 30 43 E 0,090 1000 O 30 999,99 927,99 S40,OOE 769,12 $' 14~,11 E 782,32 5 10 ~2 27 E 0,070' -32,59 .1100 0 15 1099,98 1027,98 S2~,OOE 1200 0 20 I109,98. !127,98 S40.gOE 1300 0 20 1299,98 1227,98 SSO,OOE 769,67'S 14~,46 E 770,10 S 143,74 E 7.70,~9 S 144,24 E 782,93 S l_O 33 31 E 783,40 S .!__r.O..__.B.i__.2____~ E 783'78 S 10 36 18 E 0,2.5o ' -~_2 ._._~7 ' __ C.'._, o 90 '- ~.2_..2 O' i0 J ~') ' B_l.: 77 1400 0 ~ 1399,9~ !~2~,9e N5~,O0~ 770,24 S Ia4,94 E 1500 O, 30' 1499,98' 1427,98 N20,OOE 769,56 S !45,46 E 1600 0 30 1599,97 1527,97 N50,OOE 768,85 S 145,96 E 783,76 S !.¢ ~9 26 E .~__~_ !__~_0 7 83 · 13__S .... 1..0__~..2_I14 E Q .,_~_.~....1 7 82,58 S LO ' _~_.~_.~..7___g. .......... C m "m .2~ 9 ...........!900 O. 25 !899,97 . 1.F. 2_7_.J...O..L._S..7._6,..O0_~ ........ _7_68,68 S 147.,12 E 782.~__6_~_......~ ..... 1.0_ii_~.i0__ ....... ~ ~ .............. :g. Ii ,_~ 0 II ..... .2.':9...00 O. 35 1999.,~..6 .......... .~.~.2..7.,96_ ...... $5.O.~..O..gE 769'08 S 1~7"91 5I.Z.B_3'--.~J!....7.__.S.___.l..O___5..} ...... ~..1 ...... ~ ............ 0._"__i...50 b' mECDRD OF SURVEY aLL__C_ALC_U_LATI_C,~S_L~ERE_FO__RF,'.,E_D BY I B ~," EL_E_¢TRO,X.'LC__C__C,VPUTER T ,'.~EAS, DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES____ C L__C S__U R E S "',KD TU A '%S& F D=DTH S_EA D I FL~_C. D_ I_ &_T__A_D_LC E A,S".G LE _'..-'..... , ..... ~-__~ .' . S_E.V.E R i TY .S..E_.CTI_O__~ _2.._5_0..0_ 1 .... ~ 2_A~9_~9_1 ~%2~7__;9_1_.__.S_4.9_,:90E 77~_,_3_0 $ 1.5_3,_24 E _ZS.~.O ! 10 2'5_9~_,~9 2A2~.,_~9. $.5._0_,_0_0E _7_7..4,?~ $ ~54.,_.E5 E _2_7_0...0_~2 9 26~_~_.,_B_:5. 2~6...2.._7_,_55. S_5_'Z_,_O_Q_-E_ ? 7 6 · z+ 2_ S_ 1 D 7' ,._.0_~. E Z~O 6___4.5. 279c " ' e ......... ,_.5_m Z327,3..3.. 7.2 7 ,__19 S ....... N.6.~-,._O..O ~- .. 1 ~ A,, 3_8__E _2R.09 1.0_31)' 2...?9.9,.~.,SL2.B2&,3~ ~,!.7~,_OOE___T_T..2,_l..B_S LT_E,_5.2 : 3000 15 30 2~_,o, B. 7 .g 2~_..2_~... ? 9..",,'__7_5_.._.0_0._E.. 7..6 ~__,~LS 2_O_O_,m_~ E 3100 18 15 3091,.Z+7 3019,t+7 N69,OOE 78_e.,.__,_.~_~ 5__L1__!. 2_3_2_ E 7 9_..O_,_l_Q $_i..!_1...8_!.!_ E__ 7 9_2_,_!_5.__5_;L-1_26__! ~ E 73~_,_~..8__.S_.~1_5..6_~._4_ E 7 9.L,_5_5_..5_1.3___1 2 E ..... 73_i_,5_ 0_$_ _I_A_.%e__3.Z E__ 0._,_~_4_0._ - 2_3_,_6_5 ' Q..,_l_7_0 -2 2.., 4.1__ 0_,_83 0 - &.,.~D_~ - 13..,..6_6 3__,~.5i !..,.21__ 5.....0.0 5 7 5._~._~__~_~___$ 227_._m.__~ ? E , 3200 23 15 3184,95 3112,95 N68,00F 743,85 S.. 2._5_0,__6_2_E 3300 25 30 3276,04 320~,0/.1. N6S,OOE 729,39 S 29P..,88 E .3400 27 0 3365,72 3293,72 N59,00E 712,18 S 340,03 E _ 3600 29 15 3541,58 3469.58 N7O.OOE__~3__8.,.45 S 429'09 E 3700 31 30 ~627,84 3555,84 N70,OOE 661.16 S 476.~0 E 3800 32 15 3712,7.6 36~0.76 NTO,OOE 6~3,10 .$ 5~6.2_?~__E 3900 33 15 3796,87 3724.87 N71,OOE 625,0~ S 577,22 E ~100 35 ~5 395_2.41 389_0_,al NJ_D_,.O'OE__5:~4.15 $ .6~5L04 E a. 2OO 37 0 40a2,93 3970,93 N77.OOE 579,81 S 742.59 E 4.300 38 30 ~.!21~99 ~0~9,g9 N77,00E '566,0~ S 802,24 E a400 40 30 4199.15 4].27,15 N75,00E 550,55 S 863,95 E 4500 41 4600 44 0 4347,76 4275,76 N73,0CE 516,00 S 993,18 E &SO0 41 45 4ag3.87 &a21.87 .'~71.OOE .............. 5~'00 50' O a705.01 a63~_.~_.~. ..... N6B.OOE z+95.83 S ]0~.15 E , '9 4 7/, , 96 S -. _!. ~_m_,3_Q E 451,91 S ilB6.73 E · 426.C5 : 1252,37 E 39~,05 $ 1321_.,_~_6 E 3_5..~, O~__5..____~_3_E~_,._D_S .... E 7~._8_,_!_9__ S_1.9__!.8__ 3.2_E. ...... 5,0..0.2 7 8 7 ,_3~__5__.2._2 ;_8~ 36 E _. 7_89 ,_2_Q__~2.5_ 3_.3. 20 E__ 7' 9 £~.~9£._5_ 2 _8_5. 3__k LE ~_0_2__,__7.~ 5__32 1_8 ~+2 E 815,04 $ ~5 47 11 E 832,3_6._5_33 17 32 E. 8_~0._.,_~0 S 42.__~_~_ 20 E 8_7_~, !_6 S 4 k_5._L2 ~ E__ 90_5__,8!___S 49 .-__5_!_ E 942,13 $ 5__.2 1 2 E 9~1,,~3 $ 54 47 39 ~' 1_0_2._4__._5_.1__5__5 7 2 ~ i_.6_ E. 19_ 70 ,_.z+__%.__5__.6_03___5_Q ,_E~ ..1._!_!iL2.2__S___6.2 IZ 45 S L!_~._,.'_ ~,_~'..~ ~, 5__6~. . ...... 54___%~.__E 12.._..1_9_,__6..E__S_..6_7____~ ...... 5.._5 E 12 6._~_.._~._5__S_._ a9 ....... ~_..11 E ..!_2.22_.._~5__ S..__7_L~_2._4.1 S ! 3 50,31 5__.7_2__1..~_._] g E .1_#_~_I, 5.5_....5 ~ " ...... _.7. ..... -2 ~7 E i~C7.:____4!_ 5 77 7 6 E 2_:_2'5_0 ,!._,.,_..5_1~ 1.,__7.3_0 _. __..O_,_D3 4 2,..~, 12 5 0 o .. 7_ID. o.. 1_,9.4 ~ I_.33 2 2__,_C_0_0 .... 1 · _.1 · ~.0_0 2,171 1..,_~ 2 S _2.,..52~ ._ e..,_7_5_0___~ L~_,L.49 .. _1,5f8 ..3._._.2 ~ O. ...... 3,500 _!__7..2_,_07 2.1.8_, 3.~__ 2%~.~--' i~ 2 3 !_6_._6_0 ~_5_9.._,.0.,C',.~ 422,74 ' 477,78 .- 5"_3~. 7a .5.9__~_,._0b, '655,26 RECC,.RD OF .SURVEY ~,LL.CA.L_CU_LATi.02.~ P'-RFO_P_,Y. ED ~Y I E :.'. ELECTRONIC C.u.~P_JJTER : T~US D_OG LEG " : N'EAS, DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES C L 0 S U R E S SEVERITY SECT!f' DE~TH Ar'..:GLE DEPTH SEA DIREC DISTANCE ANGLE. I_D_E_~_L.!_QOFT u__!_S_IA}.-E ,.. ' 5400 59 30 a877,24 4805,24 N67,OOE 302,88 S 1547,64 E 1576,99 S 38 55 '56 E 2,75~' 1'g40,64 $ 5600 60 ~0 4976,8S 4904,86 N6!,00[__235,12 S 1707,27 E 1723,38 S ~R.. 9 31 E 0,2~0 16..~_1_~.~8 5800 61 0 ~O~a,~6 5002,~6 N7Q,OO5 169,14 c ~858,56 ~ 1875,.2_~ S ~& 4~ 39 E ~.~na .- ~ ' - -' ~ ~ -- . ......... ~..~_~.~-W ........ __5900 61 30 5123,0S 5~51,06 N69,00E 13E,43 S !950,67 E 1955,58 S 85 ~6 28 5 __0,920 _~000 61 DO 5170,77 5098,77 N69,OOE__ 106,94 S 2032,72 E 20]~,53 S 86_._~.9 lS E 0,000 .... ~_~.00.&2 0 52].8,1i 5146,11. N68,00E. 74.,65 S 2114,68 E 2116,00 S 87 58 40 ~ Q..,_~_~ 2..044,~7_ 6200 62 15 5264,86 5!92,$6 N68,00E 41,54 S 2196,54 ii 2...197,03 5___88 54 59 E .Q.e...i.2,__~_Q ........... 2.!3.1_,_6..6__ 6300 62 0 5311,6215739,62 N68,00E 8,43____$ 2_27¢_t60 E' 2_278,51 S 89 47 16 E O,&...5_O 2_2_~8,95 6~00 62 0 5358,56. 52_8_6_,_5_5 N57,00E 25,3.5 N '~60,17 E- .2.~.~.~~.~_9_23 4 I E 0--1.-8..8.3.. 6500 61 O' 5406,28 53~4,28 ~"~°,00= 5n 27'N 2441.,_65 1= 2442,.3..4 N 88 37 57 E 1,8~_8 2392,79 ' :~' F_ 1.. .. · ,. __ . ................... 6600 60 45 545a,95 5382,95 N68,00E '90,29 5! 2522,92-.E 2524',54 N 87 57 I F. 0,80'1 6700 60 45' 5503,81 5431.,.nl N68..,007 122,97' N 2603,82 E '2606,72 N 87 17 45 E O,O00 2565, 6PC'.9 60 30 ..... ~552,86 ~'6.90,86 N68,00E 155,62 N 2'684,62 ~ 2_689,12 'N 86 40 56 ~ u,'250" 2651,38 6%00 61 30. 5601,34 5529,34' k68,OOE__ 187.,38 N' 2765,71 Ei2772,12 N 86 6 12 E .!;_O0'Q.. .'27_.B-1975 7000 61__~5 7100 62 30 7300' ~2_'15 7aO0 62 15 7500 62 45 7500 63 0 7700 63 0 .7800 63 0 79~0 63 0 ~64~, ' ,~7 ~_~.,~ N~_,LO~.._E 22!_,_3.4 N .28~7,~3 E 5595,62- 562.~.,52 NT~,OOE 2~3,74' N 2929,~3 E . .. ~7~8,i7 571~,17 ~5~.,OO':E 319,43 N ~094~_~1_____E 5~94·73 5762·73 N6g,OOE 351·87 N ~17&,55 ~ 5880,90 5808,90 N6.8,00E 384,38 N %~_9 · 0~..~ ~925,~,q 5 ~5/' ,"c~ ;NTo- ~n= %_1 7.:..(I0 ,N ~ ~_~_L,_.8_~_ ~- -' .. . ..... ..,_ P_.W_ ~ '-- -' 5971,89 5899.89 N69,,OOE /-...,.48,93 N ~_4_..2_35_,_Q_7 E 6017.29 59a5.29 5:6...8 , 005 481,58 N 3_.5-_07.~7 5 __6062,59 5aon.6o N69..n'= ,, ,__2~. N __3_5_9_0_~_87/__F.._ ..... -- ...... _.._;_ ...._ ...... ._ ................ ,., O- ~ ! 4 28_~_5.,88 'N~,5 ~3__17 = 2940.50 N 8_5 2 58 E 3_Q..2.5_,_6.3 ~._...8..~__3.~._..1_6 E_ ........ 3_!_1_.0_,_6_6_ N_ 8~ 6_2_0__5 ~2._.8 l..._6.2__N_&3_. ....... 1 ~_5_~_ ,._.5.'..6._~_2_~1._~_ 7..E £~_5__._~ 0._.,.._8_~..j%..8 2_. :. 0..~ E.. T.rO.. U E 'v,E_&E, D~ ! FT PEP TH A"'"...GL:' VERLLC&L SUB .__DEl FT TOTAL____C_O_.ORD i NATES D E P T H S_EA._~D_.I_'=,, F,.._C '. DEG., DOG_.LEG _C_j..._O S__U_~L.5 S~WF__R.I_TY .~I- ~ I F"' "" I' : ~"' SZA~.~ r__ _AJ.'X~ L F DEG/10.OFT D__.~,"__ $ _S.EC T _ 83_0_0__~ 2_15 62 '.. 5 ,_6_5 _9_8 ¢_.0--62___15 .629_2.,_21 ~.,.~ 00 62 0 $~-~,. 96__ , _8_~ 00 62_15 6 ~_?E5._._7_2 .... .._N2. _-r_....A_.~-'.._ ~. _ .N,,,, 89,.n._....n. 6~ ~_0_ 6_5_27,__1.~ __~., e o 6 l__lJ 0 ~, 65_0. 3_.,_~_,__~,..~LT_C_,_Q_O_E.. 91OO 61 15 6623,1416551,14 NTQ_,_QOE 8_8.7:9__9 9200 61 0 667!,43 6599,43 N 7..0_, 0 OS 917,94 9300 61 0 67.!J_,_9_1 664'7_,.3_!. N7.0._,~_O_E. 9~7,_.8..5 N 9~00 60 30 6768,77 6696,77 NZ.I.OOE 976.98 N 45_.E_3__._ES__E 4_6.6_9_._0_7__~_~_1.9_ .... 2 .... l.O_g__ .... __~L6_6_6_~_14 ,e _z'.__7_,.,=_5_,~.__?___~ 7_B__.52__l_4__E 47 ~8_.~..,~_E 48A2 ...O.1._N_7..L_42._J.9_E 4~3__0.57 E 4928.38 N 78 3_3 5__8 £ 4912,76 E 5014.56 N 78 26 7 E 9500 60 15 6818,21 6746,21 N71,OOE 1005,28 N 9600 59 30 6868.39. 6796,39 N71,__OOE 1033,4~ 9700'59 0 6919.52 6847,52 N72,00E 1060,71 9800 58 30 6971,40 6P99,40 N72,00E 1087,12 N 7.~_,$_.0~_--L1_1_3_,__2_~ ' .N72.OOE !!39,17 ~5 82..,.5_1_N__7.9 ..... 12__3.0_E ..... O. · 2.5..~ .... ~ 5.mZ .9 '.3~ _O.'_O.Q.O------'----__6.&&5 .'33 10900 56 30 7079,22' 7007,22 N /,994,54-E .5_1_0_.0._,34 IN 78 18 34 = N 5076,04 E ~_.!;4._.5_:_$._8.. N 78 11 49 E N' 5..157,2)5 E 527Q,58 N 78 ~ '48 E__ N 5317.54 E 54~£,19 N 77 5~' 29 E 10100 56 15 713~,60 7062,60 'N71~Q_Q.E !165,59 10200 56 1.5 7190,15 7118.15 N71,OO'E 1192.66 10300 56 0 7205,89 7173.89 N7!,OOE 1219,70 10~00 55 45 730!,99 7229,99 N71,OOE 12~6,65 106nO 55 30 7~'15,09 7~43.09 ,NTn,C.O~ 1~,01,03 10700 55 15 7471,91 7399.9~ .... I_._'j_~.~O_OE 19~00 55 0 '752'9,09 7~5~~' ,~5~,~_ 10900 55'~0 7586,9e 7514.09 N69,00E 11000 11100 1329,84 1359,91 1390,02 N 5396.50 ri 5 U 75,12 E ~6 03, ~!_N 7.7 _4 2 3_9. E O.,~.D_O 5.6.Q..~.,., 17 X 5553.62 E 57 ~9~.~3 E__..~_~_O_,_~3 N 77 2~ ~ 5 E ~ O_, ~ ~ ~ = ~.5 0 ..12_ N ;.! 57~7,.~2 E 5932_.-0_.5 N 7_7 1SiS_O. E ,N 5864.69 E 60 !__$,__5_8 N 77 1.~._.._2_.~ E _ f'.. 5941.02 F ~_~_~_.,._6~ N 77 6 2.5... E 55.~"--0- ...... Z.i~...~_..~_i,.~.Z3 ........ .7...570,73 :\69,00F !419,5.6. N 6394,41__,~=. 6257.5~ N -26 5 ..... l...&=_.._ ,, 5= ~5 '"6Oq.lC~ 762'~,~0 ?.~6o~,__,.~.._~_r~"=' 144.9,81 ~',: 6~71,_20 ~ 5_~_3_.9_..._2.2_~'~_._7_~_.45 42. .£ RECORD C~ SURVEY ALL CAL_~ATLON$_~E.REORNE_DI.BY I B ~.' EL~.~.LC C~.~.~_U,~-R TRUE ~QG LEG DRIFT VERTICAL DE°TH ~.~'GLE DEPTH SUB DRIFT TOTAL COORDINATES C L O S U R E S SEVERITY SEA DI~EC DISTANCE ANGLE ~5~/L~OFT Dj_s T A N CLx_ DE_G_,___ D M S 6420.6¢_ N 7_&_3_~___37 E_~__0.724 ~.k'~2. ,. O.l_.~i~_.6__ ~. 2,1_~__5 0_,_250 6~.~.6m N ~.,~ ~ n c- Q.9_O.'.O I~...~: -- '__,, ~m, .... .-- ,.~i.. ......... ~ 7'+ a_.,._~_N ~_.5__1.1 4~ ~ ~_,_7__20 E827,67 N 76 6 13 E 0,7!6 (, &2_ _c__,_ ~_ 2 5~.'%L,..'L8 5 ~.%~_.,.1.7 __6_~.5/+ ·/+3 6826.70 ..!.!.200 55 ~0 775.5,65__ ._1_.. !. D_ ~_ _,0__,5. ~ ~,~ c ~ 792 86 __1_ 15_~_~:- ...... ~...J_ 0 ~ · ~__1600 .%5 15 7931,68__ 11700 55 0 803e,.86 7683_,_6_5_ N 6_.7., 00 E 14 ~I_. 3.9 %74.e_,_L2 .... Fi6.L.,9.9.E 15_.1.~..._63 _ b. 6..l_,~_.u.~___.~ 45,. 7796 · 4'.0. " r, ,;:' ~ o4 7852_,_8_..6...._. 790.0..,68 ~,~6 ~,O"E 1509, · ., . ~.! ...........63 7'966,96 N69,005 1639,75 11800 55 0 8096,21 B024,21 N70,OOE 1668,43 N 670&,57 E n~= 1695,86 N 57~2.02 ~ 11900 55'.~0 8153,21. 8081.21 .~71,~= ~ - 12000 54 45 8210,39 8138,39 N72,00E 1721,89 N 6859,82.5 12100 54 30 8258,2~ 8196,28 N72,00E 1747,09 N ~937,37 E 12200 5~ 30 8327,06 E255,06 N7~,OOE 1771,41 N '701/+..§~_E ..... ~ N76, . 12~00 53' 0 ~3~6,89 8~14,..~ OOE 1792,83 N 7091,73 E 6909,05 N 76 1 32 E 0,819 -- 699C,83 N 75 57 39 E 5,? 69~9,52 7072,63 N 75 54 33 E 1,004 7071,17 7153 :_9_8_~_.7.._5__5_1 52 E .~.__,_2_5_0 72_3...4,74 N _7~5 49_.~7 E __1_,]3_1 7~1a,83 N 75 48 45 E '1,978 7152,39 7 2. ~.3_ _03 7 g:_l_~_.,..O 7 12400 52 30 8447'42 5375,42 NBI,OOE 1808,69 N 7169,70 E 7~94.~2 N 75 50 29 E 3.187 7392.62 .- 7/+7!, 12500 51 30 850~,99 8436,99 N84.00E 1818,97 N 7247,82 E 7/+72,59 N ~ 54 41 : 2,002 !960n.' 51 45 ~571,07 8~99,07 N.~6,00E 1R25,81 iq 7325,91 E 7'550,01 N 76 0 19 'E' 1,259 7548_,70 12700 52 0 8632,81 ~60,.8~1 N88.00E. !829~9! N 12800 5'2 ~0 8694,03 12900 5~ 0 8754,56 13000 53 0 8~!4,7a 13100 53"!5 8874,75 13200 54 O 893a,05 __ 8 s 22 · 0 ~ N ~ .'_LO_ 0 E 1 'el2 .'6...8' __S 682, ..5._.~__}i 88 .'00 F-. !13_5,46 S 742._,__7'__%_-._. N__..%.&~_C.'_'.O_E 183 e., 2..5' ~E_O, 2... 75. , [!.~_e_,...O. fO_E__~l..[40 · 3/+ 8862.05 N58,00E 1842,45 133OO 54 30 !3500 5/+ /..5 .J~50 5= /+5 89'92,48 ~ 920 · 4.~__ i'.._.'.,':~... _7_.,_ .O_Q= 1845.99 ~. o__.5_.r...,.:_3_7 ..8_,9.2-5,.3.7_ = k'"..El..,_O OE !8 5 ~,__Z6 oI?,F. ,O..O ~r,-.~r., C:~ .,~o--,_ ~n:' !_.8..,...5z+,53. · ,~ . _.__~...\ 4:._....~..e__ ::'_w ....... .~. _r._, ._~__~._.~.. ~_ ~. ..... ,..O 0._= ...... ,_~5...6_~ 7 7404.47 E 7627.24 N 76 7' 5 E __I__1__~_~7 ,..._Lg_ .... ,J, N 77 .... _6__17. ~_E_ .... O,..Q.O_D ....... 8.2.9R,.51 ~oTTo"¢ _H.Q...-..' '=.:-___~..i.r n,, S U R -~ 9 2._%8...,...5..l.._F_EE_T_A_T_~__77 4 17 E __~,'E'~ CUR;'~ V~- R T_.I..C_A.L_SU~' N'D__-J_.VD V~- ~, ! CAL . DE~ T~ r':~- .~ T ~. S-.5A. ~I F F..E,~.E2~C.='_ C_.C~C T I ON T OTA L .172 172 · I00 '~. m.. 7~7e. O0 ~ !a"..~_ , O0 E 272 272· 200 0 0 757,00 S 142,00 E 372 372, BO0 O 0 757,00 S 1~·0~ E ~+ 72 & 72 · ~ 0 Q. 5v2 572, 500 0 , ~ ,t'6a S 141,~7 E 672 ' 672, 600 0 0 75.'7_,_22 S __!_4_2._,_0_1 E __ .73_ 2 7 7 2_., .7 0 o 0 o 7 6._7_,?_.-__a _$ _ 1_~. 2. ,. !_~. E .87_2 ~ 12 .__~ 00 0 0 .7__6_.~_., 32 -~ I..~_ 2..,A6 E 9_72 9 7 ?. 9 0 0 0 o 7 ,,.~_.%,_9_~ s 1.~. 2..:.~ 5 E 1072 1072 · 1000 0 0 7 ,5 g ,_.~_4__S !..~_..,_.z/-_, ..0_.~ 1172. 1172,- 1100 0 0 75.%·97 S I_4_.~_...,...5~+ E 127~_ 1272, .~200 0 0 7vt'.,..,,,",,. ~' lZ+4,O~. E 1372 1~72, 1300 0 0 770,}4 S 14~,73 E 1~72 lq72, 1~00 0 0 759,78 5 1~5,36 E 1572 !572· 1500 0 0 769·02 $ 145,78 E 157'2' 1672, 1600 0 0 76e,60 S 146·40 E 177.2 1772· 1700 0 0 768,57 $ !~6,74 E 1872 !872, 1800 0 0 768·63 5 146·9~ 5 , ( 1972 !~2, 1900 0 C 76~,91 S 1~7·57 E . 2072 2.072· 2000 0 0 769·&7 5 lgB·~? 5 2172 2172· 2100 0 O' 769,95 $ '14~,98 E ~,._.__2~:Y'.2 '2272, 2200 2372 2372, 2300 O '0 770·67 $ 1_.50,.0__2 E. '.' 0 O. 771,59 S 151·37 E '.' 2472 2~72, 2~00 2572 2572, 2500 0 0 772~86 S 152,79 0 774,39 S 15~,41 2672 2672, 2600 0 0 775·90 S 155.32 E 2772 .2772, 2700 0 C 777,49 S 151·53 E . 2873 2~72· 2300 1 1 77~,68 $ 174·08 5 2975' 2972, 2900 3 2 767,52 S !9~,9! E 3080 3072, 3000 7 4 759,C1S 221,7& E 3186 ~lV2· __3100 13 6 745,8~ S 255'"57 E 3.29 5 ~_2_~.2 · .3_2D 0 2 3 .3..-~.Q1 ~ 3_72.., .......... 33..0_D....- ~. 3.5_ ................... ~.52.0_ ......... ~_.~.3.2_,_ .... _~A0..0. ..... i 4,~ ~53.:, ~572, 3500 63 10 729,19 S 296,90 E 12 7..!.,.,....O_~_,, ...... 3...4.,....0.1 5 ,!~. 6 !,c ...... ~,~.. 9_ ......... 9 S ....... 2 ~..~_.~___.E · 15 672,53 S a, 45,~6 E TEUE !V. EAqU°ED_..,. , VE=TICAL, 5t. JB ;."D-TVD VEOTICAL COp~ECTI'''~' "' L n,-',. T" 3_ ~_ 2 ~_~_. 3 _ 6 _:,,? n ,', 7~ 16 6~. 1 .,~.3__5 ~.0 Z..2 Z_F 3_870 3 v','~ '~ '~ ~.~. 5_:61.,_7_5_ E_ , .~.., 37D_~,. 1 g 6._30_, ~ 2 S 3~9e 3_812.., ~..0.0 _L] ~, 20 b.l.fi,3_6_S _62~ · 63_.E 4112 3_.02 ~--,, 3.9_00 1.3 = 21 ~ 0 q ' m -- .... ~.--'-2 I i ~_~__.',.,, 691 ·_7 .~__F _~.Z%.6_ ' ~+072.:_. n'O0____ . 5~,. on S ~$~- 8~__E .. ~:,.., .__ 1.64 25 , ~..,~_~ , ...... _&3.54 _ ', 12.Z_.__._~ 1_0_.0 ~ 92 Z_8 556.,5_0 S _8_ 41 · 5. O__E z+~97 ~+2'~2_,_ 3.2.0,..0_.' ~° . . . .... ~ g_ ~_2 ~.3_.~,_/.Z__5 ~..2.9....~.8_E 4533 4372. 4300 2~..1 37 509 ·.~2 5 !_~ !._5__,..P..5 ' E __4770 4472, 4400 298 ' 37 ~,81.39 S__ i.!iC:_/e..,..._4__Q ' E /-+ 9_0_6 a 5 .......... 72, 4., ~..Q.O 3.3.3.__. ' '~.,., ~ __ __ 5050 4.67__2., - _4_6_.0_ P_ .3_77 44 52'08 4772, 4700 436 59 5390 4872· 4~00 517 ~1 5590 4972, 4900 ~18 1~1 5793 5072, 5000 721 103 6002 5!72, 5100 8~0 109 6215 5272· 5200 943 ..113 6428 5372· 5300 1056 113 . _ ( - 663a 54,72. 5400 1152 106 101.40 N 2550.43 E 6539 5572, 5500 !267 105 16~,36 N 27!6,15'E 70~9 5672, 560'0 1377 110' 237·35 N 2887,45.E .. 72.6'_5 5772. 5.1.00 '1/+93' 1'16' 307,83 N 3_C.6_.5.48 E 7480 5872, 5800 1608 115. 377·75 ,N. 3242,59 E 7700 5972, 5900 '172~ .120 4a~.93 .N 3~.2_5,07 E 7920 6072, 6'000 1848 : 120 520,59 N 3607,52 E $!~0 5172, 6100 '1968 120 589,40 N' 379.!~02 E 8356 6272.· 6200 2084 116' 658,02 N 3969·76 E 87.83 " 6a72, 5~0C 2311 113 7ql.78 N 4~_.2.2.~45 E 8993 5572~_ ...... 6m..~,~__~ 2421 110 ~855,90 N__ 4ag~,3.Q E 9201 6672, ~.~.QO 2529 108 9!a, 24 ~'~ $~56.m*~J.~ 9406 6772· 6~00 263q 105 9'78,68 N 4835,51 E .................. ~!!~_, ..... : .... f:_.%20 ...... .~135 101 !~.i.~, ,_Q__~ ........... 5.000..~2 ~ E 7072, 7000 291& ~5 !1~5.56. N 5~05,4'} 5 L ................ 3:6...0,. 7__ .' ...................... ~._,.~.01 9986 '. :A.SU=~~ '~'-OT~ A:.!~ OT,.-'E~ DATA FOR F_V-'Z'RY EV=~''' ..100 F~'FT OF SU..__U~ SEA __ ,..-, · , _ ~ ~...~ ...... · , , , _. , . __ , ' TRUE ' :':iEA.S_L?_.E_~ VERT.!_Cr....L S._UB ~.~.D-TV9 VS'.~T ! CAL DFOTH ~.EO T? S.~_A. ~_I_E_F_E R E~_C_.[ CO,--:...RE'CT I O~ T O T A_L £ Q£.3R. Dj:Ai A__T_[$ 10167 7172. .710C 2995 81 1!~3.73 ~: 5449,17 E ~ ~ 7200 3C7~ 79 1232.10 N 55~.65 E .( _ 103~'6~ 7~7., ' -- 10524 7372. 7300 3152 78 !279.97 N 5728,55 5 10700 7a72, 7~00 3223 76 1329.84 X 5~64.69 E 10875 7572, 7500 3303 75 1392.60 N 599S,27 E 11051 7672. 7600 3379 76 143~,81N 6_1~.~3~3 [ 7700 3~56 1~90,~1 ~ _~2.68,70 [ 11229 7772, 77 11406 7872, 7800 .353~ 78 1547.88 i'~ :S~.0~'.08 E 1.583 7972. 7~00 3611 77 1604,43 ~ 6'538.57 E 11757 8072, 8000 3585 74 1655,'26.N 667.!,52 E 11933 8172,__ 8100 3~_~.1. 76 12106 8272. 8200 3834 73 170~+,64 N 6~07,76 E 17~8,59 N 6942.01 E .... 12~75__L 8372. 8300 3903 69 17R7.86 N : 12440 8472. 8400 3969 65 1813,.33 N i. 12601 8572. 8500 4029 61 1825.86 N ,._ 72..._C,_I.1.~ E 7'326,70 E 12764 8672. 8600 4091 62 183_!.69 1836,27 745a.98 E 12929 8772, 8700 4157 66 75A~,17 E 13095 8872, 8S00. 4223 66 1840,27 N 7718.82 E 13264 ~972. 8900 4292 69 1844.,55 N 7855.15 E 13~37 9072. 9000 4365 73 7995.99 E DEPTH SEA TOTAL r~ ',,: TE --'~. ..... I A 1 oO0 9°.9, 927, 2000 q 99q', 19.2_7_, 7.63_,_97 %9 0 0 2~0 .%5. 2~ 9_2 3_, 7 6 5_.~O___S &COO 39E0. 3808. 602.91 ~ 000 4.6__3 %, 45_6%, 42_6_._0_5 .... 143. lC E _.,_._[9 E 2-LC."~. ,_08E .,' 52g. 99 E 7000 56t:8. 5576. .. 8 0.0 0 5._1_C_.!, .... 6_0_.~, 9 ~00 65.7 ~ . 6,5_.0:_~ · !000,0 70T9. 7007. ........... 11000 76n2, 7570. 12000 __13000 88Lz~. 87~2. ~'- HORIZONTAL VIEW i' SCALE I."=1OO0' J i , I f'I ATLANTIC RICHFIELD COMPANY ' i -I ..... · I~ WELL DS i.8 .... ! RADIUS iOFiCURVATURE METHOr~ . . ', ,' "' r .... I"'='"~'"'i ....... ; I. ALL DEPTHS SHOWN 1:. ,! _. i,~ ' ,~ ~l'!"" ;Il'ill ' I !]", i'1;'t;']'~1~', ..... I' ...........','ri' .... I'I'I '- I' '1 '.'"~"r q ..... 1 ........ r']'-T' · . . . !, .......... 1--- l:.:r,.:i.'-t-;l'. 1 ;. 'r'i ......... ......... I't-1 ......... ,.""l ...... [ Ii .... i Ii' i *!'i i' i~ !' ," I ' I ~ 'r"l','-i'"'i-~'i't i '~ ~I / I 'I~!F'I'!'-l-'l '!"'t~ . t I 'l i ;i ...... ~i"'i ..... I ....... i ..... - ........................................................................ i ....... - ~I ,!' '_~1"I. ........ _ . ,l'l I · ' I' i ' , I'~' [ "' !I {"'( ...... i'-~ ....... , ..... i"'] ..... ] .... I"1"1";."~,'' ' ' ~ ' i": I 'i' 'i ......... / 1'1 ' '';"i.i' '~l i:, i'~ ....!~'l , 'I :' ";' !',":" ...... i' F' t'"F'tllt'I ..... i'" ti.I'. -I .~l ' .... ' ........ '~ ..... ,. ~1'"" ...... ,-~' ."1'~'-i~ .~ ..... .,~ ..... i"'1 i. '~ ' '1 VERTICAL SECTION SCALE I"=1000' ATLANTIC RICHFIELD COMPANY WELL DS I-8 RADIUS OF CURVATURE METHOD 1600 2000 ~400 ~800 ALL DEPTHS SHOWN ARE TVD 7200~ 7600'~,.~.,. TVD= TMD =1~,550' Atlant~Richfi~ldCompany North Amer Producing Division North Alas ~trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 8, 1975 Mr. O. K. Gilbreth State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 RE' Drill Site 1-8 Permit No. 75-26 Dear Sir' Enclosed is a Report of Operations on the above mentioned well, covering the month of July, 1975. Very truly yours, C. R. Knowles District Drilling Engineer CRK' alm Enclosure STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY RE!PORT OF DRILLING AND WORKOVER OPERATIONS 2. NAME OF OP]gI{ATOR Atlantic Richfield Company 3. ADDRESS 3F"OPEI~A~R .... P. O. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WF_J-J~ 1078' FNL & 1517' FWL of Sec 8, T10N, R15E SUBMIT II~ DU?LICATE ~-~AAP! NUA{ERICAL CODE 50-029-20160 LEASE DESIGNATION AND SERIAL ADL 28328 T IF INDIA~I( ALO/TE.E OR TRIBE NAME 8. UNIT FARA~ OR LEASE NAME Prudhoe Bay 9 WELL NO 10 FIEI_J<) A-ND POOL. OR WILDCAT Prudhoe Bay, Sadlerochit Pool -n SEc, T., R.', m. CBO~VO~ HOnE OB.rF. CT~ Sec 4, T10N-R15E 12. PEi%MIT NO 75-26 13. REPORT TOTAL DEkDTH AT END OF MONTH. CI4ANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLLrMES USED, PERFORATIONS. TESTS ~NT) I~gSULTS FISHING JOt~; JI/NK LNI HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CI~iA3qGF~ IN HOLI~ CONDITIONS Report on operations from July 1, thru July 22, 1975 Drilled to 13550'TD, circ and cond for logs. Ran DIL and Sonic/GR/Density. Stuck and recovered Sonic logging tools. Wash and reamed from 12286' to 13550'. Ran 1904' of 7" liner w/shoe @ 13550' and top @ 11647'. Cemented w/700 sx Class G cmt. CIP @ 11:00 PM 7-13-75. Drilled hard cmt 10721-11647'. Tested liner lap okay. Cleaned out landing collar and hard cmt to 13530' Tested casing and liner to 3000 psi okay. Ran cased hole logs. Reversed out mud w/Qater and water w/diesel. Observed well for flow. Installed 5-1/2" rams, PU tubing safety valve and tested both to 5000 psi. Ran 5-1/2" tubing assembly w/4-1/2" tailpipe bottomed @ 11555'. Landed tubing and tested control lines and hanger to 5000 psi. Pulled dummy valve from nipple @ 2215', and circ lines. Reset dummy and tested to 5000 psi. Set BPV & ND BOPE. NU tree and test w/5000 psi. Set packer and sheared out PBR. Tested packer okay. Ran dummy gun to 13,524'PBD. Release Rig @ 9:00AM 7-22-75. Well shut in. 14. I hereby eerti}y that She fp~regoing_ is true arui correct " , ' , ' , NOTE--Report on this form is required for each calendar month& regardless of I ,fetus of operoti~n-~, and must bo filed in duplicate with the oil and gas conservation committee by the ISth of the succeeding month, uflles~ otherwise directed. AtlanticRichfieldCompany North Amc Producing Division North Alas. Astrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 July 31, 1975 Mr. O. K. Gilbreth State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 RE' Drill Site 1-8 Permit No. 75-26 Dear Sir' Enclosed is a Report of Operations on the above mentioned well, covering the month of June, 1975. Very truly yours, -~'ONFER: FI'E C. R. Knowles District Drilling Engineer CRK:alm Enclosure AUG 4 1975 Form STATE G, ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT ~ D'UPL,ICAT~ ~5~API NUAffERICAL CODE 50-029-20160 6 LEASE DE$1GNATION AND SERIAL NO. ADL 28328 2. NA/~E OF OPEI%ATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. O. Box 360, Anchorage, Alaska 99510 LOCATIOI~ OF WELL 1078'S & 1517'E of NW cr Sec 8, T10N-R15E 8. L.~IT F.~J~A~ OR LEASE NAME Prudhoe Ba7' 9 WELL N'O DS 1-8 (33-4-10-15) 10. FIELD AND POOL, OR WILDCAT __ P~oe Bay, Sadlerochit Pool 11. SEC,, T,. ~., M.,-{BOSOM HO~ O~~ Sec 4, T10N-R15E 12. PJ~MIT ~o. ,,75-26 13. REPORT TOTAL D]KPTH AT END OF MON'I'H, CHA~NGES IN HOLE SIZE, CASING AND C~ENTING JOBS INCLUDING DEPTH SET A/kq3 VOLUIVIES USED. PERFO1R3kTIONS, TESTS A/q-D I:LESULTS. FISHING JOB~. JUNK Ilq HOLE A_ND SIDE-TRACKED HOLE AND A/qY OTITER SIGNIFICANT CI-IA2~GES rN HOL~ CONT)ITIONS. Report on operations from 6-4-75 thru 7-1-75. 20" conductor set @ 100'±. Spud @ 5 AM 6-4-75. Drilled 17-1/2" hole to 2700'. Ran 77 jts of 13-3/8" 72# MN-80 Buttress csg to 2674. Cmtdw/6400 sx Permafrost II cmt. CIP @ 10:40 PM 6-7-75. Washed out 13-3/8" x 20" annulus. Landed 13-3/8" csg. Re- cemented 13-3/8" x 20" annulus. Cut casing, set OCT head, test packoff. NU and test BOPE. Cleaned out to 2582', tested casing to 1500 psi okay. Drilled to 2710', tested formation to 0.65 psi/ft gradient. Directionally drilled 12-1/4" hole to 11675', trip. Hole taking mud on trip in. Lost 15 bbls mud, circ and cond okay. Drilled ahead to 11985'. Ran 288 jts 9-5/8" 47# MN80 and S0095 Buttress csg to 11960', float @ 11881', lower FO @ 2628', upper FO @ 2402'. Cemented w/1500 sx Class G cmt. CIP @ 8:10 PM 6-25-75. Installed packoff and test to 5000 psi okay. Open lower FO, cement~dw/ll5 sx Permafrost II. CIP @ 6:30 AM 6-26-75. Closed FO and tested to 2500 psi okay. Ran RTTS. Opened upper FO, pumped 4'75 bbls water and 290 bbls Arctic Pack. Pack in place @ 6:50 PM 6-26-75. Closed FO and test to 2500 psi. Installed 5" rams and test BOPE. RIHw/8-1--/~" BHA. Drilled float, hard cement, shoe @ 11960', and formation to 11995'. Tested to 0.62 psi/ft. Drilling @ 12760' on July 1, 1975. fl r , Il !i ~ ~'-' IL, II ~,lll ' '~'~)T~'--Rel)ort on thi$,orm ,. required for each ~alen. ar .nth~ regar.les' of ,'e *tatu'o, operations, and m~til''in~p~t'wi~t~ JJj,' oil and gas conllrvation commlflee by the 15~ of the suocNdJflg mon~. unleK othlrwile directJd. AU6 4 1975 May 5, i97§ 'Re: Prudhoe Bay, DS 1-8 ( 33-4--18-15) Atlantic Richfield Company Permit No. 75-26 Mr. C. R. ~owles Atlantic Richfield C~mpan~v. P.O. Box 360 ~chorage, Alaska 9~10 --~ Dear Enclosed is the approved appii~tion for permit to drill the above referenced well, at a location in ~tton 4, Township lO N, Range 15 E, U. M. ~ll s~ples, core chips, and a mud log are not required. A directional survey is r~uired Since ~i-s will be the Bird .well drilled into Section 4, Township 10 N, Range l§ E, U. M., it is called to your attention that only two of the wells can have sa~s of the Pr~hoe Oil Pool open to the well bore. ~ny rivers in Alaska and t. hei~r drainage systems have been classified as important for the spawning or mi§ration of anadromous fish. Operations in these areas a~ subj~t to AS 16.50.870 and the regulations promulgated there- under (Title 5, Alaska ~inistrati~ Code). Prior to commencing operations you may be contacted by tPm. Habitat Coordinator's office, Department of Fish and ~. Pollution of any wate~ of the State is prohibited by AS 46, Chapter 03, -Article 7 and the regulation~ .promulgated thereunder (Title 18, Alaska Administrative Code, C~pter 70) and by the Federal Water Pollution Control Act, as m,qended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. Very truly you~, ~. O. K. Gilb~th, Jr. Chai~n Alaska Oil and Gas Conservation Committee ~G:be Enclosure cc: Department of Fish and Game, Habitat Section w/o encl. Depar~nt of Envir~ntat Conservation w/o encl. Department of LabOr, Supervisor, Labor Law Compliance Divisi~ w/o encl. ,.Atl~nticRichfieldCompany North Art'~'~ ~-'~')roducing Division North AJa=,~,a ~ ,~trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 April 30, 1975 Mr. O.K. Gilbreth State of Alaska Department of Natural Resources Division of Oil & Gas 3000 Porcupine Drive Anchorage, Alaska 99504 RE: DS 1-8 (33-4-10-15) Sec. 4, T10N-R15E, UM Dear Sir: Enclosed is our Application for Permit to Drill for the subject well together with the $100 application fee and the required plat. This well will be directionally drilled. The surface locatlon will be on Lease ADL 28329 and the target location is on Lease ADL 28328. Both leases have effective dates of 9-30-65 and termination dates of 3-27-84. The information in the above paragraph will be helpful to the State Department of Labor. Sincerely, C. R. IC, nowles District Drilling Engineer CRK:alm CRK/PA¥/alm Enclosure SUBMIT IN T .ATE, Form IP--I (Other instruct~ ,s on reverse side) P,.EV. STATE OF ALASKA OIL AND GAS CONSERVAIION COMMITTEE __. APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK ~ft, TYPE 01~ WORK DRILL OIL[] OAS F-' W~LL WELL OTHER ZONE ZONE 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRF~S O~ OP~TOR P. O. Box 360, Anchorage, Alaska ,, 4. LOCATION OF WELL At surface 1078'S & 1517'E of N3V cr Sec 8, T10N, R15E At proposed prod. zone 1320'N & 1320'W. of SE cr Sec 4, T10N, R15E 13. DISTANCE IN MILES AND DIRECTION F.-IOM NEAREST TOWN OR POST OFFICE* Approximately 2-1/2 miles No.rth of Deadhorse, Alaska 14. BOND INFOFLMATION: Type Statewide suret,~ ~.d/or No. Federal Insurance Co. #8011-38-40 15. DISTANCE FROM PROPOSED* i16. NO. OF ACRE.5 IN LEASE LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. 3960' 2560 (Also to nearest drig, unit, if any) 18. DISTANCE FROM PROPOSED LOCATION* 19. PR'~)POSED DEPTH - TO NEAREST 'WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2640' 14~010 21. ELEVATIONS (Show whether DF, RT, CH, etc.) 39' Gravel Pad APl 50-029-20160 6, LEASE DESIGNATION AND SEI~LAL NO. ADL 28328 7. IF INDIAN, ALL~E OR ~IBE NAME 8. UNIT~FARM OR LEASE NA~ME Prudhoe Bay 9. WELL NO. DS 1-8 (33-4-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay~ Sadlerochit Pool 11. SEC., T,, R., M., (BO'CTOM HOLE OBJECTIVE) Sec 4, T10N-R15E 12. ,~.o.~t $100~000 17. NO, ACRES ASSIGNED TO THiS WELL 320 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE ~VORK WILL gTAR'F* May 15, 1975 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEP3~I QUANTITY OF ¢'EMZN~ -- i , ~ ~, ,- , 32" 20" 94# ,,H-40 100' Circ to surface approx 500 sx 17-1/2" 1,3-3/8',' 72# .1 MNrS0 .2700' C. irc to surface approx 5500 sx ., ]2-]/4,' 9-5/8" 47# MN-80 12550' 2900'+ cmt coltm~ Oa 1st stg appr. _ ,, ~ ,~C~q.-:~.~_ _. I1 750 .s~c/ SOO'_+ cml column on 2nd .., a~ro× 125 5X stg 8-1/2" 7" (liner) 29# N-80 12250-14010 1800'± cmt column, approx 400 sx The Atlantic Richfield Company proposes to directionally drill this well to 14010' MD (9256'TVD) to produce the Sadlerochit zone. Logs will be run over selected intervals. A 20-3/4", 2000 psi Hydril will be used on the 20" conductor. A 13-5/8", 5000 psi Hydril, 5000 psi blind and pipe rams will be used on the 13-3/8" casing. The BOP equipment will be pressure tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. Due to the depth and high kick angle (59-1/2°), a 7" casing liner will be run over the bottom 1600' MD interval. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen or plug back, give data on present productive zone and propose<i new productive zone. If proposal is to drill or deepen direct Lonally,, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer program. 24.1 hereby certi~fy~th~is ~Drue an& Correct DATE - 4/30/75 (This space for State office use) I SAMPLES AND CORE CHIPS HF_~UIRIilD OTHER REQU~EN'I~: YES ~i No DIRECTIONAL SURVEY REQ~ ~ YF_~ [] NO _ 75-26 PERMIT NO~ ~. _ . A~PROVAL DAT~ APPROVED B~ ~ ' ~*~e In~u~ons ~ Reve~ Side · CONDITIONS OF APPROVAL, IF ANY: t SEE TRANSMITTAL LETTER A.P.I, NIYMI/iKICAL COD~ 50-029-20160 May 5, 1975 ..... DATE... May 5, 1975 WELL $ (Control Pt.) LAT 70° 14' $0.55" LONG 148° ?.~ 42.60" Y = 5,94061Z X = 698~ 697 ELE:V.' :~$.4 Ground · ,9.5' Top of 133§' _) 1356' 1378' 1399' 1420' i_ 1452' ...... 1485' 1517' 154~' ..... $¢ L~ ADDED HOLE No. 6 SCALE: OEC. t~' ,1974 CJR DEC. 13, 1971 A.L.L. DRILL SITE N -I t.l; (..,) .~ P· I-'i _~-, UM!.A.'! MI?~!U.I~.N.,A~.. AtlanticRichfieldCompany c. :.; r v ~ y (: ,J J~, 'f ....... '~'~[E'cK'' LIST .FOR NEW .NELL 'PERHITS Compa. n~ , ". ~ . · " Yes,,,,~'". ~ 1 I the permit' fee-attached ~K ' 2. Is well to be located in a defined pool ......... , ..... ~ 3. Is. a registered survey plat attached ................ 4. Is well loCated proper distance from property line .......... ~. 5-. Is well located proper distance from other wells .......... · .6. Is sufficient undedi.cated acreage available in this pool ..... , ~. 7 Is well to be deviated " · ' ' · · · · · · · · ! · · · · · e ~ ' · I · · · · · · · -; ' affected party ' " 8 Is operator the ly m l ' · · on · :. · · · · ..... . 9..Can permit be approved before ten'day Wait .. ..... .. ~. . . . . . : . ~. . ) . . · · . ·· · · . '.. · hv i ' .. ... , .lO..,.Does operator a e a bOnd'.n force . ~" . · /~J~ . cOnservation °¢der needed....... ll I ' ' · sa ' '' · .............. :' .." · i va'.. aPpr°Vallne. . 'eried .' . ........ /~ 12 .. is administ---- . .. . . , . r~c. · ...... . ............ · . .... · . .... ' ct'Or stri: 'proVided...... m m m m : 13 I"cond "m m m ........ m '" s u ng.' ' :' ' ' "' .... · mm . , e, · ' · · ' · · ' p · e. · . & · · . · '· ~ · :. :e · · '~.f~--~ " Lease& Well NO. ~'.~. . RemFrkS ....... ... _ . 1'4.,':':..; I:s en'ough..cement...used to Circulate on ConductOr.and Surface. ., .,. . ....'. ,..' ...:.: .i...:::'..'.':.............. ... .. . . ...... : m ' : m.' mm' . ' m ' mm · ' ' mm m .. '' m : . : m m . :mm.m. · ' ......... m : mm ' · m ' ' · ' . ' ' , ' '. m'' ' · m m' ' ' . "m · ~ m ' '~ 'm . m m . ' m ' mm' .' ': 'lUi 11 '.'Cement 'itie' in surface .and in. temediate .or' ,._ _ __. _ ___ ~ nrodUCtiOn:"s't-r~nos" ".'.' .~'~::.".."'. ' "' :..' .... - ; · ''" 'm ' ' m m :=...:. ml.;' m mm m m ~ m ' ' : m m ' . . mm . . pm mm . m . m:. . . . ;.' m m ' m "m ' ~ mm . . . . . ~ .. lmm . . : '' mm m . ~.. mI : ' '' ' m 'm . m mI m .mlm mm . . m mm . . m ; mm ' ' ' m m m' m'' m ' '' ' 'm''' ' '' mm'' mm m~' '"(ppm : ''=:Am ' mlm 1 5' '1':6.'''"";'' ~Wi'l'i cement'cover a 11 known "productive..;' hori zo.ns' "i~"',' ','. ","" '.' .;,""'. "',:, '.' ,. "','".", ':':":.;;~ '?,'. ':......' ....:'.:,.':'.:'""":~ ..".."i.'''''.'''''''''' .' ":'.~ '.'=';"./':'. :'""';'"~.":."..'" ~';..".. ' .':'.".' "../'. :;' "' . '.:" ' '.." '.' .'.; "" ~-"." .' "'.." '.':: ' :."' .....'"' '.'::'..' .'. '.'...%.::' ;."' i'" ':'-:""'.".". :';.:'."'. ". "'.'.:'i.'.:'.'~-'....'.";: .:i'.71'. "::" tV,'i.: i. 'S Urfa'ce ':',~ S i'ng' :.protect':. 'freSh' :' wa te.~.: zOnes .' '.:: m ~''' ''''''"'' ' ~' :': 'I '' ":"'" ': I'll' '"' :'"'' '''': ~" "'Il:";' . ~.. : ''Il ' ;'1:':~'' '~" ..18.i. :';.i.:."::.:Wi ! l' '. al1 :".casinlg :g live. a dequa te'. 's'a fetY. i"n' c'.o1 l:apse,' tens ion. & 'burst .'".'". '. mmm :~'~"9;"'!i"./' D0 ~ ':' B.'O P E':".'h ;'Ye':':'"; ~¢ f~: c..i'~:~..~":':'P;~s S U~e"" ~a t.i.~g!.:':'" .:..; ;.?'.':.'..'??"i:. :":.'.;:';~,".,:...:',i.'. ;:;.?:':i',...~:.: i""" ::;':.'::"::':i??'i ...... I , , ,' , m , II ,, ',i~ ,I ..... :i ,,iii ,' I i i i ;' , i:, ' i ,I' i I ' , : ,i ,, m ,, i 'I , ,..... I : ' 'I I I : ,: , I i',,' I ....... , i,,i'i:I ....':; .... ;'...: .. ' . . ............., ..... '' ' . : , ' . ....... :' .' .....'. A ' ..I . ' I. ' . r' : . I ,i~ I ' .....i ' , , , ' I' ' ...... ' ii m: 'i'~I,.' ' ,:,:~ ' i': : 'I i , 'Addi.t~onal 'Requirements :- :..?. ~.!..::' :' ..":..".: ::' · ....'.~...'~. ":.......' .~..' ........'.:.'.:.' .':'..":' :...:.':,::..:'..':,.":.::.~..:."..~..:.i/..::.,. :.'..' .. ~...:.'.,.....'..:'..:..:::.:".'..'.:.:.:.."~ '...'..~"..~ .:.:..:.'::.......'i ::.'.i...'/':..": .' "..:.-..i':-.'.~i'.'...".::,:.~.':.~".'.....'. :'.,!'...".'.."~",.'.;. ::" :: ..:..". ..'.' ::"":':~':"~ ':.'.""..".'.'..i :Geology ' ...... :"'.." :i':~ '...!' ~,.../.'.'..:.'.'. '.Engineering :.'..:.".:.'.i:..i.'..i..:'..:.::....;.'. .:'..'..'...::....'.......,.:,:.:..',.::.~..'~ ..':.'" '."""." '...'.:: '~ :' ".: ..' ".::. '.. .... ." .. '.'.'""'~ .'..'.'.:':' "."i ':'...'.:': "'.'.'~ 'i "". :'""' ~""'. '.'.'' ..":.'.'. ",' '".".'." .":'...i'i '-.' .' ..' '."~:'"."~..:'.."'.'." ' :' -'." '""..' ..:":".'-'.i~' .' '.: '..'.JAL' . ' ..:;..."..... : .... '. t. CS 7c~?'"'JC~ .....i-'.-':'/.~'~'".".i'i...'".':'.'"'.'...' '', : 'm: ~:m m m'mm ~, ' m' m,' m ' mm : '~ ....... m' '' , , '~ ',' '' , m 'm , Pm: 'V , m ' '., m m' ' , ) ~ · , ' m ' ,m m' ' : .... m :m' m, m m, ~ · mm m'' m ' ', ' m'ml' m ,,' ::,m ' mm ~ :' ' , m' ' , ~ · · m ' m m , '" m ' , .'' I'm · , m m ' ,' m ' · · ' ~, ' , m · m m mm m mm . m ,' mm ' ,m m, ' ' mm , m m , .... m'm .... 'm ','' , m m m' · p :V m' : ' ' .... ' ....: : ' Im m --' ,m ', m,, m · I' m ,m m m' m , · : ' ' ' ' ' ' ' ' ' ' ' ' ': ' '"' ' ' '.' 'i'i.;":. :': .' ..' . '= ":L . '. ~'.:~.',' '. '. · .... ;' ' 'r~,' . '...: "' . ......... . ' ......... .............. ' ...... ~ ..... ': ..... t~ :: : -- · ~,:~ ,, ,: ,,, · : m . '. m,m, .m .... m ' : : , m , m* , : ........ : m ;..] ' .:, .... i ........ ii ~ ~ .;i ,, .... : ............ i · · · , I , m m ' i "· m , ' mI' i'.','m ': m m ,,'' '' 'm,;':m ' m , ~, mm ': m:~m~,~m;' ' 'm ~j 'm~', ,' m' mm m'~,:'l ,m; m'' m m l':mm:'mm,' ', ,' m m:.',' ,":mm:m"mm m:,' : m' :' m:' ':', mm ','m'' m mm' '' m' ,''': , ~' ' m ' l"ml ' ; , p,'~ J :' mmmm', ",m,m'mm , , mm m :'' ', m:' ': ,'mm::~m ~ ', ',: m'~,"'' i ,m m' m'` ,', m , ' ........... :,m ml" "' ,;','i ;' i i:'I , i 'Ii, iII ...... ' Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. ., No special'effort has been made to chronologically organize this category of information. TAPE LYF' OUg. F02 VEt~IFI,£AI'IO~ h]ST~}.6 PA'(E ** TAPE NEADgR ** SERViC~,~ NANE :Sg~VIC DATE :81!05/1~ TAPE NAME : CUNTINU~IlL)N ~ :01 CUM~gNTS :T~PC "~MENT8 ** FILE HEADER ~Ihg NAME :SERV1G.0( 1 SERVICE NAME} : VERSION ~ : D~TE : MAXIMUM 6ENGTH : 1024 FILE TY'PE PREVIOUS F, ID~ ** [i~ORMATION RECORDS mN : D.S. R.~NG: i5~ TOWN: ION SECT: COUN: N. SLOPE STAT: ALASKA CTH'Y: U.S.A. MN~]M C.ON~ENTS PRES: FDNOO1F H i Ct-ill I ELD RECORD T'iPE 047 ~* R~;CORI) I:¥PE 047 ** U N l T UN iT ~I~YPE 000 000 000 O00 000 000 000 000 000 TYPE CATE 000 000 0 O0 000 000 000 000 000 000 CATE 000 020 010 015 003 003 001 010 010 010 SIZE 007 CODE O65 O65 065 065 O65 065 O65 065 065 CODE O65 LVP 009,~i02 VEHi~ICAIIi35 LiSTI~G PAGE 2 .~ RkCCRD TYFE 047 *~ CI~L RUN ~ 2, LOGGED 22-APH-81 POR[t$1I~ MATHiX = ~ANDSIO~L ~ ~ATA FOAM~I H5CORO * ENTRY BLOCKS ?¥P DATUM SP~2KfICATi. CN 860 MNEM SERVtCg S~RVICE U DEBT NPHi DES P GR SHF 6 FCNL NCNb SIZE REFP CODE EN]'PY 1 66 1 4 73 ~0 4 65 .11N I 66 0 NI~ API AP1 APl ~PI ;~I/E SIZE P~OO~S6 SAMPLE REPR LOG TYPE CLASS MOD ~0. LEVEL CODE ~ 0 0 0 0 0 4 0 1 68 U 0 68 2 0 0 4 0 I 68 0 42 1 0 0 4 0 1 68 AP1 0 31 32 0 0 4 0 1 68 0 34 93 0 0 4 0 1 68 0 34 92 0 0 4 0 1 68 uEPT FCNL DEPT ~'CNb DEBT ffCNb D~PT FCND DEPT ~'CNL ATA ** 13~89.500 NPHI 0.000 NRAT -99~.250 GR -0.004 -1,350 NCNL 13400.~00 NPHi 25,497 NAAT 2,882 G~ 20.362 479.417 NCNL 23~.384 13300.~00 NPHI 26.617 NRAT 3.459 GR 54.505 592,741. NCNL 293.060 13200.000 NPHI 24,937 NAAI 2,808 GR 35,736 839,993 NCNL 407.0~5 13100.)00 NP~I 18,298 NAA? 2.475 GR 29,147 894,938 NCNL 420.6e7 LVP 009.H02 VCRiI"ICATiON LIS~IIN3 PAGE 3 13000.000 NPhI 1554.277 NC~L 129C O, O( 0 NPii i 949.~83 NCNb 12800.000 ~P~I 946,449 mC~L 12700.000 NP~i 1458.123 NCNL 126C0.0(U NPHi 620.21q NChL 12500,000 i~PM1 3'72,962 NCNb 12400.000 NPfi 311.i49 NCNb 12399.0C0 ,NP~ii 77 , 6 3 3 N C N L 14,539 526.281 ,15.098 435.979 13.739 439.382 12.019 527.255 2i.578 362.81,8 47,015 281,575 0. 020 235.537 0,000 54.01,1. N~AT NRA~_ NRA~ NRAT N~l T N~AT ~* FI. hE TRblLER a* FILE NAME :5ERVIC.O0t SERVICE NAME : V'E, RSiON ~ DATE : MAXIMUM LENG~}~ : 1024 ~ILE IYPE : NEXT ?IbE NAME : ** TAPE TRAILt~R 5~sP, V ICk N A~! E ::5 EIqV IC DATE :81/05/18 TAPL NAME : CON~I~UATIUN ~ :01 NE~T TAP~ NAME COMM~'~T~ :T~PE 2~ME,NTS SE}~V12E NAMg] :SERVI2 DAIE :81105/18 OklGlm : R~EL NANE :~EL CONTiN0~TION ~ :01 NEXT kEEL ~A~ : COMM~NT~ :REEL 2.385 2.215 2.029 2,732 4.170 4,379 4.536 GE GR GR 37.633 47.017 54.405 89.147 110.312 1.393 -0.004 [,VP 009.~02 VmRI[~ICa'liOI~ LISTII~!G PAGE 11 0©0000 77777777'77 000000 7777177 !77 11 © 00000 7 ? 717 '! 77 '? '7 000000 7 ? 77 "17 ~ 177 1, lll O0 O0 77 O0 O0 77 1 ill O0 O0 77 O0 O0 77 1 I O0 0000 77 O0 0000 1 ? I i 00 C, 000 77 00 0000 77 i 1 00 00 00 77 00 00 00 7 't I 1 00 00 O0 77 00 00 00 '17 I 1 0000 O0 77 0000 0() 77 I I 0000 O0 77 0000 00 77 1 t 00 O0 77 00 O0 77 i 1 00 00 77 00 00 7 1 I 1 l 1 11 000000 77 0{)0000 77 1111 11 000000 77 000000 77 /-3 ~066t~b 11 000000 44 44 177 ?/7 ? 17 1 6~0. ~-6~: ! 1 000000 ~4 44 7717777717 06 t I 11 O0 O0 44 44 ?'7 60 Ill.1 00 O0 44 q4 77 66 I 1 00 0000 44 44 77 ~:~ ~ 11 00 0000 44 44 7 7 OObbOb66 11 O0 O0 O0 4444444444 7 7 t')6eoOO6b 11, O0 O0 O0 444/444444 77 6e~ 66 11 0OO0 O0 q4 77 6e~ 6~ 11 0000 O0 44 77 0~ b6 1 I 00 00 44 '17 6 o 6 t> 1 1 00 00 44 7 '7 i)bb'i)b6 I 11 I 11 000000 44 '7 '7 006~66 11 I 1 i 1 000000 44 7 'l *~STP-,P,T* Udq. e,R U'CAb [10707,e, lOq7t ,.]('J[5 ShIP SL~,~. 2928 I')ATL 21-uC1-80 08:37:4,~ *5i'aP~', USLA }"CAi: [10707~010z~71 .jf;.!~ S~tlP 5Eg. 2928 DA'fL 2!.-UC1'.-.80 0~:31:44 t4UNIT~tP 5¢~S I<.bl0~.:z~O SLi:'-d~h, ,[ .I. I I I i 1.i II I 1 tl ] I :I 1 I,I I.I. II 81<:0o 2928 OAI'i= 21-UCT-80 21-UCT-8() 08: 04.' 4t~ 08:31:44 PCCC 1 1 1 I I .IL 111111 II II I I I I 1I Ii I1. II 111. i I I i 1 1 1 1 1 YY ¥¥ YY YY 000000 000000 44 44 00 000 0 () 00000 44 44 00 00 00 00 44 44 00 () 0 00 00 44 44 00 0 000 00 0000 ,44 44 O0 0000 OO 0000 44 44 00 00 00 00 00 00 444.44 .~ 44 O0 O0 O0 O0 O0 O0 q4444444 0000 O0 0000 O0 44 0000 O0 0000 0() 44 O0 O0 O0 O0 44 O000OO 000000 44 000000 O00OO0 4,4 44 44 2928 DAT~, 2 1 -'OCT-80 21-uc'r-8o 08:35:1.8 08:.~7:44 COMPUTING C~NflLR 80110121 0 1 I}ATg~ 89110121 Jl'h ii'![,UPYiArit!¢~ P,~CiJRD 0 1, 6 6 0 SPECLI'ICATI[]N BhL~C~,,$: t7) E; F:' 1~ H I ~ % 05.000 t 3SO(). 000 400 . 000 I 3300,000 13200.000 1 ~ ! O0. ! ~ 000 . 000 12900. {)O0 12800 . 009 12700. 000 !, 2e,,O0. OOO 124()0.000 :12 3~0. O0:3 G E G f? f C N b F~ ('7 N L ~, C N L Gl<. 1~ C N L [',i C N b k C N [, lq C N L' f (? N L (; P f,,i C i',i L f C I,~ b N C N b N (: N ~,i C i',i [, (' }: f'CNL VAL - 0 0 2 15 71 185 .1 O0 .0 () 0 .145 .0 00 .000 . :I, 45 .7 (.} 0 ,214 .328 50. 9,',4. 2 ~5. 21. 1 32. .335. 101. 309. 17. .2. I ~1. '424. 2~. 1 38. .~ 3 9. 30. 213. 418. 10. ~9. 285. 92. 21:7. (.) . (J. 2 00 .380 95 0 900 478 40O 7 3 8 000 92g 281 9 () 0 76 ~, 200 585 662 5 O0 21 t 704 10c) 2 t Y 20 () 074 000 t45 000 O00 000 000 N P fi I ~ C N L t,! P H 1 N P H 1 GR fCNL t~ P H 1 G~, ~ CN1. N P }i I G~ f C Nb N i) iH I ' t¸ Phi R · ~ F h l GR ['CNL PCaL [~ CNE ~' C !".I L V A L, LIE .0 O0 .000 .000 0.000 -0. 100 0.000 21. 1,6. 71. 27. 54. 90. 21. 17. I]e,. 20. 101. 10. 25. 15 3. 14. 25. 1%5. ]¸1. 28. 222. IQ 90. 42. 91. ,.52. ,m 0. O. O ~ 0. 9. 7qO 700 643 740 '700 090 ,300 422 22O % O0 67 3 680 40 () 2!16 200 .582 04O 900 431 440 600 980 ¢) 00 040 .5 O0 7 ~7 o 0 () 000 o 00 000 0 O0 0 O0 a ,R A I' I:,~ R A T N F: A f i~ P H 1 N P H 1 NPtd I N P ti I r.1 pt11 t'.~ R A I' V A [, U -0.002 0.000 -0. O02 0. O 00 2,01 B 2~. 440 3.018 27. ,~ 20 2.blb 22.b20 2. 800 22.980 I. 88 4. 10.540 2. -':t 26 17.9%0 2.128 13.920 1.958 11. 320 2.51 .:t 1 ~. 1 40 3. e2:~ 45.980 ~.278 -5.000 0.000 - 5.000 ~ C N b N E A 1' NCNL J'~ R A l' N C N b r~ C N b N R A 1 [~ R A T N C N b N R A 1' i'~ ~ A T NCN1. btRA 1' i'~] C N NC m b NC Nb aHAi ,'4 C N b NRA [ V AbO~ 2.145 -0.002 2.145 -0. O02 186.186 2.1 '7 b 247.902 2.582 341.91 3 308 .O22 434. I.. 329.472 2.41,8 393.822 2.1.02 4 i 8. 104 t .912 21~.421 2 22z.222 3.974 12.012 0.000 2.51q 0.000 i- J. L, E ]~ R A .l 1.,E l:~ 1.024 01 DATk~: 80/i0/21 ,l .,'.: i':0 ~iaska 0ii & C--o~ o 000000 000000 00 O0 O0 O0 O0 0000 00 0000 O0 O0 O0 0 0 0 0 00 0000 00 0000 O0 O0 O0 00 00 OOOO00 0 0 0 o 0 U 177777/777 177 ? 1 ? 1 ? 17 ?? '1 ? 77 77 17 77 ? 7 1'7 tl 17 44 4~ 44 44 44 44 44 4~ 44 44 4'~ 44 4444444~44 ~444444444 44 44 44 44 7'7 i 't 777777 7'777 117'177 ] 7117 ? 1 ? 17 t'77777 l ?'17 77 ? '1 7 '7' 7 ? "77 1 ! 77 j 7 7 7 '7 1 I 7 7 7 7 7 7 7 7 7 ;7 7 '1 "i 7 7 ' 7 'l 7 7 1 / 7 '7 7 7 7 ] U U D 17) D O [1 U D [J 0 D U u D U U P UUJ. IUU Df)DH * 5 [' A ~ .r * t;,:":,. I:. i-: P C A l, L 10 '797, b 04 '! 7 J ~4[Ji,~ll'Lik bw'a t, LIC) C,.~I aPR-~9. *6TA[~'[,~ *L4I'ART't USkP ["CAi.~ l.]0701,bOl'77j M(JHirt{R 5'w& ~LIOk.:l? AP~-~IO. *SI'AR'I:* d tJ SHIP 8k(~. 4097 SHIP ,5L~. 4t}g7 [)A'I;L 22-JOb-80 13 A'i'L 22-JUL-SU 01:2~:5i 01:24:5j I t 11 1 I 11111 ~L 1. i 11 1I 11 11 l 1 tl il il i111t,[ I [ I, I i I ~Y O00i)(~o OUOOOO 5555555555 000000 OOO000 5555555555 00 00 0 o 0 O 55 00 0 0 0 0 00 55 OO 0000 ~0 0000 555555 O0 0000 (~0 0000 555555 O0 O0 OO 0() O0 O0 55 00 00 00 o 0 00 00 55 0000 O0 O~)OO O0 55 0000 UO 0000 O0 55 O0 UO O0 O0 55 55 00 00 0 () 00 55 55 000000 Ot) O000 555555 0000O0 oo0oQO 555555 4. h97 DA'I'i~., 22-dUL-80 22-Jtll.~-~0 01:20:25 01J24:53 8C h b UM F..F;~Gt:.iR CtJMPUTIlN6 10 '? 07,60 '~ 77 80/ 712] T A P E ~ ~, A D ~..R SER V l,C~ N AF~,; bPlT Ol L) A T t:::: 80 ! '? / 21 1024 B~"I'~.8 1 66 0 I 14 0 0.0 0 0 1 ?, 3 0 0 . {3 0 0 1 .~ 2 (! 0 . () 0 ('] 1,3 tO0.O00 1 30~)0. 900 1291) 0.000 12:4UU.Oti0 F C t,~ L. NCi',I b G~ f CNL .N C N L FCN L N C N b G ,R N C N L i,i C N I; G P NC Nb. 6i4 t~ C I~ b G }:: ~ Ci,~b i'~ C N L v ~ L U E 0.000 0.000 -'4. 719 0.000 0.000 0. 000 1. 0. 600 52.3 ]8 203.406 15.4O0 51.91,5 159.588 54.700 83.22b 320.034 50. 900 ? 5.075 192.e21 I 1. 500 105.105 4 ? 1. 042 19.3{)0 108.537 286.1 4.] 15.300 .88.374 4533.290 18.40O 89.232 2 t~ 0.4 ~).3 i. 9.100 lt>2.591 590.304 1 ~. 900 1 '71.60b 22.500 114.114 20.20u 12-~t. t I 0 29i.297 25.900 125.697 491.205 25.300 132.i32 304.590 ~" C N b N Ptt I NPHI GR t, CNL NPr{ l ~CNb [~PHI b C N b fCaL a P }~ I ~'~C NL GP, t' C G~ aF'H J. NPHi V A h U E 0.000 0.000 0.000 0.0 () 0 0.000 0. 000 25. 440 17.200 58..it ,44 2:1. 100 1 7. 400 59.631 27.720 5b.900 68.640 25.460 53. 300 74.64 ,6 2:3.-.580 18.600 102.960 19.b00 19.1.00 11 3.e~85 28.400 16.800 90.519 22. 900 10.700 86.22q 15.06O 22. 100 160.446 1 (). 860 22.1.00 17e,.748 I 8.940 26.400 96.954 I ?. bO() 26.[400 130.416 19.460 29.800 122.265 12. 000 2 6.20 0 130.'ll,6 NRAT NPHI. NRA~f NPHI ir'~ R A '1 N t~ A 1' i,IPH 1 GR i'~ P H 1 i~ R A 1 NPHI G~ NHAT NPH 1 NPhl J~PHI t'~ F~ A t r~P~ 1 G~ i~ R A ! r~PH I. V A h 0.000 0. 000 0. UO0 0.000 0.000 2.8'70 22.800 1a.797 2.098 20.820 2.9]8 29.780 41.594 2.946 23.780 2.'712 24.~20 13.59~ 2.580 20.160 2.91b 29. 600 14. ]98 2.156 22.34O 2.180 14.880 14.398 1.952 10.140 2.708 2~.060 19.984 2.504 !U.700 2.406 I 7. J't0 23.1B8 2.0ob 14.360 a f'~ E M 0 r,t 1 C N R,A I NC N b NRAT NCNb NPrtl NCNb N RA'I NCNb N~AI' NPfil NRA:I' NC N.U NPHI NCNb NPH[ NCNb NRA~f N R Al NCNb NRAI btPHI tqt~A £ NPHI t',i C m b V .A b U b -4.'? 19 -999. 000 26.855 0.000 0.000 249.6i~ 2.002 2b.514 lb3.153 2,088 354.354 3.050 25.b35 201.201, 3.114 2.802 25.195 288.117 2.07o 441.01~ 3.lib 28.02'1 2.75~ b88.159 2.140 lb.~,69 1.90u '40 1.OlO Z.q08 282.2e:z 506.~49 2.302 22.314 29U.862 2.240 25O0,000 12 400.0{)0 I 2 300 . 000 12 ~Oi). O0(ii 121t0.000 170g0.Ol!0 a N 1:., ?,t 0 i',11C VALUE G~ 2,6.5(.}0 i'~P,H l i 2. 940 .~ Cab 1 v t. 878 GR 25. 700 NCNb bO0.171 f Ci~'~b 171. 600 (,;P, ] I, 400 NPHi 10. 240 ~:CfqL 169.88't GR 30.JO0 ~uCNb 364.221 P'C aI,, 175.890 o 3.000 ~'~ P it I 19.660 82. 308 GR bS. 100 41 3.985 FCNb 80.652 69,700 NPH1 17. 280 7 S. 9 ~6 Gi~ 69.500 249.249 ~CNL 75.93~ 88. 800 NPttI 41. 600 46.3 ~t 2 G R 8 .::1.100 .311.025 ~C~b 44.616 8 ~. qO0 ~PHI 38..~00 45.90.~ GR 94.'100 187.04:~ ~Ct'ab 45.474 GF~ -999.250 ¢~PHI -999.250 ~ Ci~L, -999. 250 GR -999. 250 NCt',i£, -999. 250 f CNb -999. 250 GE -999.250 NP},.iI -99925.000 ~ CNL -q99,250 GR -999.25{) ~'~:~ C ~'.i 1..., - 999.250 f C N t., - 9 g 9.250 (ok -999.250 NPHI -999.250 f Cat., -999.250 g}{ -999.250 HCNb -999.250 ~ChL -999.250 OR -999.250 NP}ll -9q925.000 t' C i,JI, -999.250 GM -999.250 NCNb -999.250 1- CNI, -999.250 GE -999.250 r,~PHl -999.250 ? C i',~b -999.250 GR -9c)9. 250 ~'~C i'.i i, -999.25{~ t'CNL -999.250 (;~< -999.250 NPftI -99925.000 f, Ci~i~ -999.250 GR -999.250 :4C.h ~ -999.250 i-CNL -99q.250 -999. -999. -999. -999. -999. -999. 250 NPHi -999.250 25U GM -999.250 250 fCNb -999.250 25() Ni('H1 -99925.U00 250 GP~ -999. 250 250 rCNb -999.250 r,~ C i'J j_, P C h ~ C ~'~ b M £~ k N O N 1 C V A b U k M N E M U N 1 C nRAT 2.020 NCNb 509.28,] aPHI 1.2.500 NRA:t :1.984 GR 23,984 NPHI 12.988 NRAT 1,940 NCNb 347.0bi NPHi 10.300 NRAI' 1.90B nRAT 2.492 NCNb 404.118 NPHI 17.020 NRA'i' 2.28~ G~ 53.969 NPHJ 20.020 ~Ai~ 2.480 NCNb 2~0.bb9 NPHI 15.'100 NRA:'~ 2.322 NkA1 3.81b NCNb 265.122 hPHl, 48.8b0 NRA1' 4.0.30 GA 99.50] NpHI 48.'730 NRA'I' 4.212 NCNb ~4.18'1 NPHi 0.000 N~A'i~ 3.930 NRAT -999.250 NPH1 -999.250 GH 1.0'1.5o3 ~gA1 -999.250 NPHI -99925.000 l~RA'i' -999.250 NPMI -999.250 GR 12b.18B NRAi -999.250 nPHI -99925,000 NRA'f -999.250 I'~PH1 -999.250 bR a~A'l~ -999.250 nPhl -99925.000 NRA:I' NPHI i~CNb NCNb NRAI NCNb NI{Ai' ['~C Nb t~ PH 1 t,~C Nb N RA'i' i'~ C 14 b N NPH1 NCNb NRA'i NRAI' -999,250 NPNI -999.250 GM 94.750 t~RA'I -999,250 NPMi -99925,000 -999.250 -999.250 -999.250 -999.250 -V99,250 -999.25U 49.1/0 -999.250 -999.250 -999.250 -999.250 ~3.?01 -999.250 -~99.2b0 -9~9.250 -999.250 34.033 -999.2b0 llgL!oo()i)O l t ~O0. 000 [ 70 (). 000 1 ! e~O0.O00 1 ! 5 0 0 . 0 0 0 I.I SO0.O0(> 1 ! .300.00() 1. t 20U. OOO k C N L N C N L GP 1' C N .N C r'~ L G~ nCr~L ? CNi~ NC ~,~ b l ~ C t~ L, !',1 C N L, (;~: I,~ C iJ L Gfi /- Ct'ih V A i.: U E; -999. 250 -999. 250 -999. 250 -99<) . 250 -999. 250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.25O -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999,250 -999.250 -999,250 NPH i -999. 250 G}{ -999,250 FCt,~b -999,250 {'~F~'il -99925,000 GR -999. 250 ta C:J~b -9~9. 250 -999. 250 -999. 250 '999.250 '~9925.000 -999. 250 -999.250 NPHI -999,250 GR =999.250 ~C~b -999,250 NPMI -99925,000 GR -999.250 ~'C~b -999,250 ~PHI -999.250 GR -999,250 f'CNb -999.250 NPHI -99925,000 G}'{ -999.250 PCNb -99q.250 NPH1 -999.250 GB -99q.250 ~CNb -999.250 NPHi -99925.000 G~ -999,250 PC~b -99q.250 -999.250 NPhl -99q.250 -999.250 GR -999.250 -999.250 ~CNL -999.250 -999.250 ~PHI -99925.000 -999.250 GR -999.~50 -999,250 ~C~h -999.250 -999.250 -999.250 -999.250 -999.250 -999.2%0 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 NP~)I -999,2b0 GR -999,250 ~CNb -999.250 NPhl -99925.()00 G~ -999.250 ~CNb -9q9.250 -999.250 -999. 250 -999.250 -99925. ~)00 -999.250 - 99 9.2 50 NRAI -999,250 {~PH1 -999,250 GR ~4.3'75 NRAT -999.250 ~PHJ. -99925.000 bi[{AT -999,250 NPHI =999,250 G~ 45,909 NRA'I -999,250 NPMI -99925,000 NEAT -999,250 i~PHi -999,250 G~ 58,781 NRAT -999,250 i~P~tl -99925.000 NRA~ -999,250 NPul -999,250 G~ 98.3'15 NRAT -999,250 ~PHI -99925,000 NRA'£ -999.Z50 NPHJ -999.25{) ~R 53.969 NRA1 -999.250 NPHJ-99925.000 n i.-~ A'l' -999. 250 NF'Hi -999.Z50 P~k,A't' -999. 250 NPH 1 -99925.000 NRA£ -999.250 NP~I -999.250 GA 22.391 ~Ai' -99~.250 NF~i -99925.000 nkAl -999.250 nP~i -999.250 bk -999.250 r~A'i' -999.250 t~PHi -99925.0¢)0 ~'i N E. M (J N J. C NRAT NPHi NHAi NCNb N HAl' NPHi. NC .N R A l ~CNb NRA'I' NPHi NC Nb NRAT NCNb NCNB N R A 1: NPHi NCNB NRA'i NCi'~ b m R A'L NCNb m~Al' i~C N b ii R A'I NPIil ~ C N b NRA1 NRAT NPHi o~CN b NRA [ -999.250 -999.250 52.148 -999.250 -999.250 -999.2b0 -999.250 ~8.242 -999.250 -999.2b0 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 43.311 -999.250 -999.250 -999.250 -999.250 51.074 -999.250 -999.250 -999.250 -999.250 49.~05 =999.250 -9~9.250 -9~9.250 -999.250 -999.2b0 -999.250 -999.250 -99925.000 -999,250 -999.25u 102.4 BITES rAPE I l~. A 1L.~:R DATE: 80/ 7/21 7717777777 7777 777777 71 77 77 77 77 17 7~7 ll 77 7'1 1771777/7 1 ? 777 i) 77 ! 7 17 7'7 ?7 7'7 '17 7'7 77 77 77 77 71 11t7711)71 !7 i 7 77'7777 17 ?7 77 77 I? 17 77 ?! '1 ! 17 33 :~333 33 33 33 33 *Si'AF(q* oS[<F t'C~b tiUiO'?,$'7073j !"![Ji"J! T'I'i~L ~.~;5~ r bi L,b, ~4 Jt.lt,'=' 1~:~, *~'1~.h~t'l,'.* d A'i'i~. 27-3id V"- 79 i2; t7:22 12:~'7: 22 1 ! I i 1 1 1 i JCl, II I 1 .1 I. il !i jr,~ j~) 2'1-!,.t,.~v-79 i2:1'!:0'? 11 11.11 /1 iI~]J!. YY i2:31:22 1070 ? ,.~70'7 J t..)Ai'B; '/91.1 uAI~,:: 7qll 1/27 L, k: [',~ G T P.,: 1 ~o o C lC ..4 I o bl Z,L 0 0 P t,~ 0 0 0 ! 0 0 0 0 0 0 0 0 00 u 776 791 4, 0 o ~ 00 I 1 400 4 1.4 250 i:i .t,..' ti I o. u 0 0 N H A, 0.0o0 VALUE, -~. 1i~ a ~. A I i't tx A 1' 3. $82 2.650 2.916 2. 108 !',;i .... 1 I ~ 00 ~C ¢1 b , ,~.i 12. !60 2.0 ~8 1,~ f:' h i 2 0.16 0 0. 000 i,i i: i-I i, -:[ 6.0 8 0 r,~ C r,,i b ,',f'H.l. -99~425.00() 2b~.w6~ 41(~ .988 44'1.018 5 1~.72i 492. ()o 3 558.558 31U.596 2o5.122 -9~9.250 iu24 ~.) C P8 ~2 42 ~z APl 0 31 .~2 /4P 1 32 3 1 9~ P I 3~00.000 1 330(;'.000 i 31 00. o 00 ! ~ 0 v 0. o 0 I ,2'?00,000 .!~,~ P i:.i :it 2 (t,. ~.) 8 t) V AInU c. · -, 9 ¥ 5J. -999.000 V AbUB -4.719 ;'~ P t~ i 33.760 N R l T ,.~. 2 } 0 N C ~(i b 395 ,, 9 O 7 2. ~30 2.$22 2.o76 !,,i p ti i 23. % 6 O N 8 A i n C r,i .b ~.'; P H i 2 7,0 (40 r'.; P i'i J, I 5*. 54 0 i).,~.P ,~i 1. I. 2.5bl() pate/1 t' 2. OOb t'~iC Nb be) 1. bO I 2.~52 ~RAi o~CNb Jl~JC [~iJ 0,0 0 () NC $11.02b -999.2>0 L, VP OlO*H:02 F~GE I m~ IA.[ E HE, ALEH ** [)ATE 183104125 .... ~'~ ' O00O T A P E N A ~ ~;:~: 8 2 0 c PREVIOi.]S TAPE : FIbE; NA~E :8EHV~IC,OO1 SEaV:[ 2E ~4A~ ~ : DATE : ~;~l;~lUi4 L, ENGT.H : 1024 PI bS TYPE P~'~. V I IT!US k Ci4 : AHCO A!:ASI~ A RAN(;: 15~: SEC ['~: CUtr~: h. sLOPE I a C T ¥ F B 000 000 000 O00 OOC 000 O00 O0 o 000 CATE OCO 000 000 000 000 000 000 o00 000 SIZE 016 004 011 O04 004 002 008 006 004 065 065 065 065 065 065 065 065 065 6~ 68 I 68 31.5918 55 S. 000 6 6. ~516 13,3750 5. 9062 40.527.3 594. 0000 DLPT h!CN L N R A T G*~ .! 3:20( df 0( (., ix [ ,~i ~. 29.6875 i~PAT 35~8.0300a :FCNt: 750:'5000 GP 5,1094 RN~ 4,7266 fiCNL 30. 64 (')6 5. ! 055 PN~A 28.9844 NPt4:I 353~.0000 FC~I 4.7266 687.: 29.' 5 748.5000 DEPT NCNL NR~T 13100.0000 aPBt 92.50q8 NRAq' 4270.0000 F'Ci~L 1113.0000 GF 4.0~34 RNRA 3.695t NCNI,, 23.4375 4 .~t 9_~ 4 ~NI4A t3 ,$41 8 28.4219 NPI4I 21 .2891 414R.O000 'I, CIXI., 1122,0000 DkPT n £ N 15 1300C,00£0 t, PhI 17.382a r~FAT 4740.09OO FO!vi 1442.00OO GR 3,6250 Rt.~ ~A 3,496! NCbL 27.4531 3.5020 t:Nt:~ 3,2852 26.5156 NPHI 18.2017 4724.00o0 F'C,NI. 1351,0000 t2900.0000 NP, F I 24,,2676 48.0000 ~"Chb t 124.0000 (; 4.1 ~t75 RNRA 4,0625 34.2503 4.4258 }{NF~ 4,0430 32.0250 NPH]. 22.460g 4256.0000 :FC~L 1047.0000 D E P 'r NCNL 3,4648 PNI~A 3,1016 :'~1 .o563 NPHI 21 ,5332 49.a0.0000 FCt~.! L 1414,0000 D E,: P T b! '" N P ~ T 137i00.0000 NPLI 15.P2( 3 b124.0()00 ?'C ::~n 1674.()000 3. 447 3 ~N~A 3. 226~ ~4C~,~I 3. ~ 9': 0 tiNRA t3 .0605 a0.2187 /,~PH I 1,6.9434 517~,.0000 :i;C~I 1604.0000 P E P ~1" 4,1! 220000 4. (1000 R Ni:; A ? 45. rl. N C N L At 5703 51.2.b95 ~,,![~: ": 7. 3682~0oo ¢;~ : 94.50oo 6.5352 N~t.~[ 2606.0.000 2 10 9 7500 · ~ T.~PI/ TRALt ER ~ DATE ;83/04/25 0~'I Gl {~ :OOOO TAPE NAt~E :~200 CONTINU%TI{;N ~ :01 ** C T ¥ P E: o00 00 o 000 oo0 o o 0 00 O oo 0 0 u o 000 C) 0,3 o o o 0o0 000 t) 00 000 000 000 o00 r') 0 0 014 012 o 0 3 O0 1 ~ 2 006 0 (:) 6 C © D E O65 O65 065 065 065 065 065 FC~L GP fi' ~ L t50 ~', RA'T; ~,6914 IYC?, [., ] (;, ~; ~ ~: ~'~ f~A~ 5,1016 FJC~; [. a046.0000 39.bOOC: PhRa 4,4R~3 32,3730 t,;RA~ 5.32gl aCNI. 3502,G000 22.f:2!.5 ~, k'~m 4,0273 r~,C~'J I 4!80,n000 13.21.09 H':;R~ 3,66F0 Ng×T FI. Lg N~i¥{E: : VE~<IF!CATION LISTING SERVICE ~'~ A }{ E :$~RVIC DATE :~if11/ 5 OR !G i ~'~' : REEL ~'~AF~E] :REEL iD PRE V'iOL]S REEL : COF~Eg~TS :REEL COi~i~ENTS ** TAPE HEADER SERVICE DATE :~I111/ 5 ORIGIi'.~ :1070 TAPE NA~,~iE :62242 CONY I ~,~dAT I {.]~ PREVIOUS TAPE : ** FILE HEADER ** FI~,E ~iAMg :SERV!C.O01 SERVICE NAME VERSI[~i~ ~ DAT~ : MAXiMUi'~ LE~!G'fH : 1024 FIL~ TYPE PREVIOU~ FILE : CONTENTS CN : ARC{) ALA,%KA Wn : D~{I ~ib SiF~ FN : PRUD~OE 6AY RA~'~G ~ 15E TO ?~ ~'~: 10~ SgC~l~: 8 COLJ~: r,~ORT~ SLOPE STAT: A~,~SKA CTRY: USA PRKS.: Ci:~LOO1F RECORD TYF~,: 0.~7 ~* UNLIT TYPE CATE SIZE CODE 000 000 016 065 000 000 014 065 000 000 012 065 000 000 003 065 000 OOO 003 065 000 000 001 065 000 000 012 065 000 000 00~ 065 O(10 O00 004 065 U:'~ I T 9; lpg (]ATE SIZE CODE 000 000 007 065 RECORD TYPE 0~7 1(.!707,62242 C~L RO.N #6, 18-0CT-81 TOP bOG iNTERVAb 13467 12500 TYPE FL, bID : CROQE : SURFACE BIT Sl,~,r. blOT PRf!]SENT I SIZE.~ = 9.625 iN.~ SURF. TO 11960 SIZE : 7 0 IN 11697 TO 13550 ** DATA FOR74AT RECORD *~ '~¥PE SIZE REPR CODE 4 1 66 8 ~ 73 60 L,V? or',9 Ha5 VERiF!CATIC:~-i B;::STI?Jr ' PAGE 3 DATUM SPECIFICATION 5LOCKS MNE~ 8~RV!CE SERVICE UNI~ ID ORDER ~ API APl APl API Log TYPE CLASS 0 0 0 0 42 68 2 0 42 42 1 0 42 34 92 9 ~2 31 32 42 42 i 0 42 34 92 0 42 34 93 0 42 31 32 0 42 68 2 O 42 42 1 0 42 34 92 0 42 3t 93 0 42 31 32 0 42 ~@ 2 42 42 1 0 42 34 92 42 34 93 0 42 3i 32 0 FILE SiZE PRBCES5 SAMPLE NO. bEVEL 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 1 0 4 0 I 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 ¢) 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 1 0 ~ 0 REPR CODE 68 68 68 68 68 68 68 68 68 ~8 68 68 DEPT 13505.000 NP~I FCUL -999.250 G~ NCF!L '999.250 FC~h NRA% '999.250 NCNb NPHi '999,250 NRAT GR -999.250 DEPT 13500.000 NPiii FCi~b 70.38'7 GR NCNL -999.250 FCNL NRAT -999.250 NCYL NPHi -999,250 NR~T GR -999,250 DEPT 1.3400.000 NPHI FChL 67.812 G~ NCqL, 192.248 FC~b NRAT 2.946 NCNb NPHI 25,337 NRA:r GR DEPr 13300.000 NP~I FCNI~ 89.272 GR NC!~b 340,b98 FCi~b 25.137 ~RAT 45.161 mPHI -999.250 GR -999.250 FCNb '999,250 NCnb 23.53~ ~RA~ 46.26i N?HI -999.250 GR -999.250 FC~b -999.250 ~C~L 23.258 h~RAr 21.280 ~PMi 67.812 GR 191,390 F'C~L 2.880 NCNb 31.757 NRAT 58.751 NPHI i01.2~9 GR -999.250 NCDL -999.250 NRAT -999.250 N?HI -999.250 GR -999.250 FCNL 2,900 NC~b -999.250 NRAT -~99,250 NPHI -999.250 GR -999,250 FCNL 2.865 NCCtb 25.117 ~RAT 18.383 NPHI ~4.~0~ GR l~8,~lb FCNL 3. ,!,28 r4 Cr~ h 2a.917 NRAT 5q,854 NPHI '999.250 -999.250 -999.250 -999.250 -999.250 197.397 -999.250 -999.250 -999.250 -999.250 18~.387 2,898 26.i97 12.987 63.949 351.846 3.212 29.397 LVP DEPT FCNL NCNb NRAT N P ~{ I GR DEPT FCNL NCNb NRAT NPHI DEPT FCNL NCML NRAT NPhI GR D~PT FCNL NCNL NRAT NPHI DEPT FC~L NChB NRAT NP~I GR DEPT N C ~ L N~AT G~ DEPT FC~L NC~%L NRAT NPH1 GR O0~.M05 VER!F!CAT!ON- ~!MTING 26.317 51,750 13200.000 NPHI 355.707 FCNL 2.662 NCNb 22.358 MRAT 26,476 13100,000 NPHI 148'929 GR 381.87~ FCNL 2.~02 NCNb 15.618 NRAY 1B,982 13000,000 NPHi 19W.14~ GR 400.326 FCNh 2,07~ NCNb 11.459 NRAT 17,383 12900,000 NPHi 155,367 GR 411,052 FCNb 2.368 NC~ 14.379 N~A'~ 26,776 12~00.000 NP~!I i75.110 GR 445,374 FCND 2.034 NCi:L 12.319 ~R~T 26.~76 12700.000 230.040 457.38~ FCiC 1,85o 31,672 12600.000 NF!~I 157.942 GR q02.900 FC~h 2.576 NC!~iL i7.45~ N~i 341.978 3,050 2i.018 92.479 130.903 353.562 2.778 19,018 19.I82 152,792 468.112 2.338 13.439 19,482 183.69,~ 508.012 1.990 19.198 29,774 161.37~ 505.008 2.230 16,456 27.675 193.565 538.901 2.096 11.739 30.773 220.513 54~,624 1.812 19.3~8 66.045 153.650 4'71.973 2.454 NC~L NPHI GR FC~b NRAT NRAT NPHI NCNb NPHI GR NCNb NPHI GR FCNL NCnb NRAT ~PHi GR FCNS NCnb i~C{qL 99,143 346.698 2.688 22.098 28.575 133.908 359.139 2.538 18.798 20.1B1 199.145 486,131 1'~.319 21.080 249.789 516.592 2,59~ 17.818 2'7.176 209.874 513,589 2.392 15.478 26.176 265.66'9 549.~27 2.010 12.039 3!,272 29B.717 555.633 2.60~ 2{).618 61.149 17~.973 482 . 699 NCNL NRAT NPHi FC~L NCNb NRAT NPHI GR NC~!b NRAT NPHI NCNb NRAT NPHI GR FCNb NC~ib NRAT N P H i GR FCNb GR FCi~L NHAT GR PAGE: 44,762 105.152 350,130 2.722 21,078 24.678 i31.332 381.020 2.552 16.198 16.984 210,303 415.771 2.216 12.519 16.784 271,678 409.765 2.~95 i5.598 25.17'7 224.896 434.219 2.310 12.079 26,576 257.085 450,b28 2.02~ 9,979 29.973 311.592 405.045 2.630 19.~38 65.945 193.W94 47.995 ;~!~AT a. 3'36 NCnb 242,a73 FCNL 57.082 GR NCNb 2q7,i64 FCNL NR~T 3,~1~ NCN'G NPHI -999.250 NR,AT GR -999.250 96.920 60,515 308,94~ -999,250 ~PH I GR ~EPT 1~81,500 NPHi CNL 99'250 GR NCNb -999.250 FCNb NRAT 0.000 NCNb NPHi :999,250 NRAT GR 999.250 -999.250 -999.250 -999.250 0.045 -999.250 NRAT N?HI FCNb ** ~'ii, EC TRAILER FIbE NAME :SERVIC,O01 SER Y I C ~'~' DATE : MAXiMb~ LENGT~ : 1024 FIL~ TYPE NEXT F]..LE NAME 4q,136 90.988 -999.250 -999 250 -999.250 0.000 -999.25~ N~AT GR NCNb bRAT NPHI G~ FC~L 4,048 33.877 93.823 -999,250 -999.250 -999.250 -999.250 -999.250 -999,250 ** TAPE TRAILER ** SERVICE NA~E :SERVIC DATE :~1/i]/ 5 ORIGt~ :1070 TAP~ KAtiE :622~2 CONTI~LiATIO~ ~ :0% NEXT ~'APE ~AME : CO~ENTS :TAP~ COMMENTS SERVICE NAME :SERVIC DAT~ :~il/ll/ 5 REEL ~AME :REEL ID CONTI~UATIO~ ~ :01 NEX1 R~E:N ~AM~ : CO~SE~r~ :kEEL COMMENTS EOF LIS TAPE VEgIFICATION LISTING Lv,~OIO',HO1 VERIFICATIO!'! L~iSTING ** REEL HEADER ** SERVICe7 NA~F :SF~RVIC DATE : ORIG~N : R~EL Nh~i E : RE,~L CONTI~,~UATIO~: ~ P~EVIO~S REEL CO~'~4E~TS :REEL CO~,~E~TS ** TAPE HEADER ** SERVICE NAPE :SERVIC DATE :~2/05t2I OPIG!N :1070 TAPE NA~ :65076 CONTINUATION # :0I PREVIOUS TAPE : CO~EMTS :TAPC CONSENTS ********** EOF ********** ** FILE HEADER ** FILE NAHUM :SERVIC.001 SERVICE NA~E : VERSIOb! ~ : D~TE : ~.aXIMUM LENGTH : 1024 FILE: TYPE : PREVIOUS FILE : C~ : A~CO ~LASKA I!~C. W~,] : DRII, L SITE F~ : PRUDHGE TOW~: 10~ SECT: ST~T: A[:ASK~ CTRY: PAGE U~IT TYPE CATE SIZE CODE 000 000 016 065 000 000 028 065 0~0 000 01~ 065 000 000 00] 065 000 000 003 065 000 000 001 O65 000 000 012 065 000 000 006 065 000 000 006 065 UhlT TYPE CATE SIZE CODE 000 000 OO7 065 LV~~-010'''~0! V~i~RIFIC~TIO~ LISTING PAGE COMPANY WELL FIELD COUNTY STATE = ~TL~!TIC R!C~FI~L[> CO~PA~iY = P~UDHOE BAY ~0~' ...LOPE = ,! TH S OR O' NUu ER ' J. B B A? ACC, !0707,65076 RUM #4, ~TE bOGGED: 12 ~aY 8~ BOTTO~ DEPTH TOP DEPTH CASING C~.SIMG C~MI~G C~$!~G TYPE FLUID = 13459 FT. ' 1.2490 FT. = 20 I~ 100 = 1] 3/~ I~. P674 FT. -' 9 5/8 IN. {.~647 VT. -' 7 I~. 13550 FT. = CRUDE bVP-OIO"HOI VF~,~IFICATION LISTING PAGE ** DATA FOrMaT PEC~?D ** MMTRY BLOCKS TYPE SIZE REP~ CODE ENTRY 4 I 66 8 4 73 60 9 4 65 .~IN 0 1 66 0 DATI;~ SPECIFICATION BLOCKS OgDER # DEPT NRAT S01 NC~L 801 FC~L NR~T 802 NCNL FCNL G~ 802 U~IT API LOG TYPE FT 0 0 PU 0 6~ 0 42 PU 0 6~ G~PI 0 FC~ L 13476.0000 NPMI -999.2500 G~ -Q99.2500 FCNL DEPT FCNI i 3<,00. 0000 ~,~P~I 0 571 ~ DMPT ~CNL NCNb ~3300.0000 N'PFI 68 7296 27~ ~ 7~05 D~PT FC~L ~C~L 1.3200.0000 !.13.9118 317.3035 D~PT !,3100.0000 NPNI 143.8667 CR 345,2125 FCNL D~PT FCNL 1,3000.0000 !~4.2~6§ gPI AP1 FILE Cb~,S8 ~0O NO, 0 0 0 2 0 0 1 0 0 92 0 0 93 0 0 3~ 0 0 2 0 0 1 0 0 92 0 0 93 0 0 3~ 0 0 0.O00O N~T 0.0071 NPHI -~99.7500 ~w 23.0973 16.8980 63.5'173 25.7458 48.~809 v3.4525 21.2483 NR~T 20.a. g61 NP~I 112.0944 GR 17.8502 N~AT 15.&987 NPH! 144.7254 GP 13.5725 17.4977 SI -999. -999. -999. 23. 20. . 21. 48. . 23. 27. . 15. Zg 4 4 4 4 4 4 4 PROCESS LEVEL 0 0 0 0 0 0 0 0 0 0 0 2500 2500 2500 7944 8668 2962 9205 6880 8809 636.3 6869 392~ 4581 2894 2989 1~19 5720 NCNb NCNb NRA. T NCNb t~ C N b NCWL NRAT NCNb SAMPLE 1 1 1 REPR CODE 68 68 68 68 68 68 68 68 68 68 68 999 2500 173.8944 2.7164 258.0507 2.6003 306.9987 2.7764 347.3594 2.57~2 374.4096 2.2259 b~P~Ot~0',M01 VT~IFICATIO~I LISTING PAGE 4 NCNb 375,6977 177,3563 DEPT 12900,0000 NPMI FCNL 169,1.986 GR MCN! 378,7033 FCNL 14.6119 NPAT 19.096~ NP~I ~70.4867 GR DEPT 12800.0000 ~P~I FCNL 187,6609 GR NCnb 400.6011 FC~L I~.55~5 N~A? ~.8948 ~PNI 193.6715 ~R DEPT X2700,0000 ~P~I FCNL ~29,7376 ~R NCNb 426,3632 FCNL 10.4542 N~AT ~4'6938 NPHI 2~5,0147 ~R DEPT 12600,0000 NPNI FCNL 10!.3605 GR NCNb 2B~,242! FCNL 28,3644 91.~582 94,9202 DEPT 12500,0000 NPHI FCNL 57,1370 CR NCNb 215.5432 FCNL 42.9163 N~AT 80.4640 NPHI 51,1260 GR DEPT 12479,5000 NPHI FCNb -999.2500 ~R NCNb -999,2500 FCNL -999.2500 NRAT -999.2500 NPHI -999.2500 G~ ** FILE TRAILER ?!bE NAMM :$E~VIC.O0~ SERVICE N~NE : VER$IO~ ~ : D~TM : MAXIMUM L~tIGTH : 1024 FILE: TYP~ NEXT FII,E *******~** EOF ** TAPE TRait, E? ** SERVICE ~t~E :SERVIC DATE :82t05/~! ORIGIN :1070 TAPE ~AME :~5076 CONTINUATIO~ ~ :01 NEXT T~PE MAWK : CO~P;~TS :TAPE CO~ENTS ** RE~L TP~ILEP ** ORIGIN : ~E~I., NA~E :RE£L I~ 17,7975 2.2359 14.4121 ~0,9958 2,1399 13,4926 24,4939 1,8836 10,2344 27,5923 3.1407 27.8846 110.7478 4.0215 40,2778 82.~6~9 -999,2500 -999.2500 -999,2500 NCNb NRAT NCNb NRAT NCNb NRAT NCNb NRAT NCNb NRAT NCNb NRAT 372,6921 2,2039 395,4487 2,1399 429.7982 1.8596 295,4058 3,0847 206,0970 3,7573 -999,2500 0,0000 LYP Olo~,}iO1 VS'iR!F!CATION LISTING CONTIMUATION # :01 NEXT REEL COMMENTS :RE~b P~GE