Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
175-030
? STATE OF ALASKA .ýJ ~ ALAe OIL AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIONS :~ 8 \, i,W,"~' ,..(' >;:t'; ,'n m; ~.. 1. Operations Abandon D Repair Well D Plug Perforations D Stimulate D Other .[].....".N~ Performed: Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Extension'O····· . ¡ ,\, Change Approved Program D Opera!. Shutdown D Perforate 0 Re-enter Suspended Well D 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory 176-0300 3. Address: P.O. Box 196612 Stratigraphic D Service [.( 6. API Number: Anchorage, AK 99519-6612 50-029-20207-00-00 7. KB Elevation (ft): 9. Well Name and Number: 52 KB 04-09 8. Property Designation: 10. Field/Pool(s): ADL-028324 Prudhoe Bay Field/ Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 12053 feet Plugs (measured) None true vertical 9118.1 feet ';';,v'¡ ¡,., ~1i';:;(j (me?s,liFyA) None (,: b ¿U~r-..c ,""'_" ~ '''M Effective Depth measured 11957 feet true vertical 9041.78 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 94" H-40 33 - 113 33 - 113 520 1530 Surface 2658 13-3/8" 72# MN-80 32 - 2690 32 - 2689.92 5380 2670 Production 2400 9-5/8" 47# R-S-95 30 - 2430 30 - 2429.95 8150 5080 Production 8678 9-5/8" 47# MN-80 2431 - 11109 2430.95 - 8353.18 6870 4760 Liner 1264 7" 29# MN-80 10786 - 12050 8116.34 - 9115.73 8160 7020 Liner 912 3-1/2" 9.3# L-80 10786 - 11698 8116.34 - 8828.94 10160 10530 Perforation depth: Measured depth: 11575 - 11615 11635 - 11654 11666 - 11674 11682 - 11696 11752 - 11792 11807 -11824 11840 - 11865 True Vertical depth: 8727.68 - 8760.5 8776.95 - 8792.6 8802.5 - 8809.1 8815.71 - 8827.28 8873.75 - 8907.12 8919.67 - 8933.82 8947.06 - 8967.6 Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 28 - 10667 4-1/2" 12.6# L-80 10722 - 11815 Packers and SSSV (type and measured depth) 5-1/2" Baker S-3 Packer 10511 5-1/2" BOT 3-H Packer 10711 12. Stimulation or cement squeeze summary: Intervals treated (measured): RBDMS 8Ft MAY (I 3 2006 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 0 19149 10 1655 Subsequent to operation: 0 0 9813 10 911 14. Attachments: 15. Well Class after Droposed work: Copies of Logs and Surveys Run Exploratory Development Service R1 Daily Report of Well Operations X 16. Well Status after proposed work: Oil D Gas D WAG D GINJ D WINJ R1 WDSPL D 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I~Undry Number or N/A if C.O. Exempt: N/A Contact Sharmaine Vestal Printed Name Sharmaine Vestal ~ Title Data Mgmt Engr Signatu~ Phone 564-4424 Date 4/20/2006 Form 10-404 Revised 04/2004 OR' Submit Original Only GfNAL e e ~ 04-09 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE I SIiJMMARY 3/15/2006 Initial T/I/O 0/0/0. Perforated intervals 11682' - 11696' and 11666' - 11674' ft using 2.5" HSD 2506 PJ Omega, 6 SPF, 60 degree phasing. Final T/ I/O = 0/ 0/ O. TD not tagged. Job completed. Turned well over to DSO. FLUIDS PUMPED BBLS 1 I ::::L 1 A34-14RD Fm Tops Subject: A34-14RD Fm Tops Date: Tue, 2 Apr 2002 12:58:37 -0900 From: Bill Penrose <bil!~fairweather. com> To: ""oob_fleckenstein~admin.state.ak.us"' <bob_fleckenstein~admin.stat¢.ak.us> Bob, As requested, here are the tops in the A34-14RD wellbore that was P&A'd to drill the A34-14LW sidetrack. Bill AK 3460 MD ..... 3014 BA 3688 ........ 3804 BG 4050 ........ 3458 FG 8034 ........ 6380 FS 8660 ........ 6831 GD 9267 ........ 7258 GN 9573 ........ 7489 GO 9618 ........ 7524 GR 10052 ....... 7865 GS 10108 ....... 7909 HC 10350 ....... 8100 HZ 11274 ....... 8830 TVD I of I 04/03/2002 10:00 AM TO R G y March 29, 2002 Ms. Cammy Oechsli Taylor, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Well Completion Report: Well A34-14RD P&A Dear Commissioner Taylor, XTO Energy, Inc. hereby submits its Well Completion or Re-completion Report and Log (Form 407) for the work it performed to plug and abandon its well A34-14RD on XTO Platform A in the Middle Ground Shoal Field of Cook Inlet. After abandonment of the bottom portion of the wellbore, the well Was sidetracked as A34-14LW. A separate Form 407 has been submitted for the sidetrack. Please find attached the following information for your review: 1) Form 10-407 Well Completion or Re-completion Report and Log 2) Well Operations Summary If you have any questions or require additional information, please contact me at (915) 620-6718 or Bill Penrose at 258-3446. Sincerely, XTO ENERGY, INC. Bob~by S~mith~~' Drilling/Operations Manager enclosures RECEIVED XTO Energy Inc. · 3000N. Garfield · Suite 175 ° Midland, Texas79705 ° (915)682-8873 · Fax: (915)687-0862 STATE OF ALASKA --- ALASKA ulL AND GAS CONSERVATIO,, COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Wel OIL: GAS: SUSPENDED: ABANDONED: X SERVICE: 2. Name of Operate 7. Permit Numbel XTO Energy, Inc. 175-030 3. Address 8. APl Number 3000 North Garfield, Suite 175, Midland, Texas 7970 50- 733-10086-01 4. Location of well at surface 9. Unit or Lease Nam( 1622' FSL, 432' FEL, Sec. 11, T8N, R13W, SIV j['~;,,(~¢ll,'t"tO~ ~ Middle Ground Shoe At Top Producing lnterva ii ~i, 10. WellNumberA34.14RD 402' FSL, 2152' FEL, Sec 14, T8N, R13W, SlY ,_~ 'At Total Depth 11. Field and Poe 193' FNL. 2329' FEL, Sec 23, T8N, R13W, SM~ ~i~. ~'~il 5. Elevation in feet (indicate KB, DF, etc. I 6. Lease Designation and Seri~l"N'~:~' Middle Ground Shoe 116' DFI ADL 18756 12. DateSpudded8/15/01 13' Date T'D' Reached 114'DateC°mp"Susp'°rAband' 115' Water Depth' if °ffsh°re 116'N°'°fC°mpleti°nSN/A 8/25/01 80 feetMSL None 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set I 21. Thickness of Permafrost 12,100'MD/9,032'TVD 3,545'MD/3,077'TVD Yes: No: XI N/A feet MDI N/A 22. Type Electric or Other Logs Rut None 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 61 Ib/ft J-55 116' 1,565'MD 17-1/2" 800 sx 0 9-5/8" 40 Ib/ft N-80 116' 5,638'MD 12-1/4" 700 sx 0 7" 29 Ib/ft N-80 116' 9,078'MD 8-1/2" 515 sx 3,750' 24. Perforations open to Production (MD+TVD of Top and Bottom ar 25. TUBING RECORD interval, size and number SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2" 11,838' 10,899', 11,158 None (Cut off at 4,540' MD'/ 11,532', 11,787 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A 27. PRODUCTION TEST Date First Productior I Method of Operation (Flowing, gas lift, etc I N/A Date of Tesl Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD => Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE -> 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chi N/A Form 10-407 Rev. 7-1-80 ORIGINAL CONTINUED ON REVERSE SIDE RECEIVED 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravit~ MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS Wellbore schematic, Summary of Rig Drilling Operation.. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ Z _~-~~ Title __ Drilling Manager Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log o all types of lands and leases in Alaska Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, sal water disposal, water supply for injection, observation, injection for in-situ combustior Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurement given in other space on this form and in any attachments Item 16 and 24: If this well is completed for separate production from more than one interval (multipl~ completion), so state in item 16, and in item 24 show the productin intervals for only the interval reporte, in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interv~ Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.) Item 23: Attached supplemental records for this well should show the details of any multiple stage cemenl ing and the location of the cementing tool Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In. jection, Gas Injection, Shut-in, Other-explain Item 28: If no cores taken, indicate "none". Form 10-407 Cross- Timbers_Operating Company MGS A34-14RDIi WIW Cook Inlet, Alaska Leg 1, Conductor 5 APl No.: Spud: Jan 1966 P&A Orig WB 10/75 P&A ST 12/75 Spud ST 6~76 CTI 7/79 Surf Csg: 13 3/8", 61 lb, J55. Set @ 0-1565'. Cmt'd w/800 sx.. Intermed Csg: 9 5/8", 40 lb, N80 BTC. Set @ 0-5638'. Cmt'd w/ 700 sx. 9-5/8" TOC @ 3,545' 9-5/8" Cmt Retainer @ 3,700' 7' Csg cut off @ 3,752' 13.5+ Ppg mud left between cmt plugs 7" TOC @ 4,270' 7" Bridge Plug @ 4,536' Tubing: 3-1/2", 9.3~, N-80, EUE 8rd Cut off at 4,540'. Camco Mandrel @ 10830' MD (8010° TVD) (Dummy) Guiberson Uni-Packer VII @ 10899' MD (8062' TVD) Camco Mandrel @ 11059' MD (8186' TVD) (Dummy) Guiberson Uni-Packer VII @ 11158' MD (8264' TVD) Guiberson Uni-Packer VII @ 11532' MD (8568' TVD) Camco Mandrel @ 11659' MD (8673' TVD) (Dummy) Guiberson Uni-Packer VII @ 11787' MD (8778' TVD) Otis "X" Nipple @ 11806' MD (8794' TVD) Guiberson Shear Sub (EOT) @ 11838' MD (8820' TVD) Prod Csg: 7" 26 lb., S95 New @ 6667'. N80 Used ×-Line @ 6667'-12100'. Cmt w/845 sx. HC-HD: 11049'-11110' HE-HF: 11210' HK-HN: 11574'-11576' HN-HR: 11700'-11740' TD: 12010' iD: 12100' HR-HZ: 11806'-11872' HR-HZ: 11890'-11940' XTO Energy, Inc. MGS Well A34-14 Decompletion Well Operations Summary 0600, 8/15/01 - 0600, 8/16/01 MW: 13.5 ppgVis: 51 sec Build mud system and weight up to 13.5 ppg. Bleed well from 1,400 psi to 0. Built back to 100 psi. Circulate well with 13.5 ppg mud. Sa - 0 psi. Attempt to set BPV - pressure built back to 200 psi. Attempt to bullhead down tubing - would not take fluid at 3,500 psi. Monitor well - no flow. Attempt to set BPV - hanger threads bad. Set plug in X-nipple. Test against plug indicated leak above plug. Attempt to set BPV again- no good. Wait on DD plug to set below tbg hgr. 0600, 8/16/01 - 0600, 8/17/01 MW: 13.3 ppgVis: 44 sec C&C mud. Set DD plug in tbg at 50' RKB. Six attempts to get a pressure test on plug - none good. Modified BPV and got it to set in tbg hgr. N/D tree, N/U BOP stack and riser. 0600, 8/17/01 - 0600, 8/18/01 MW: 13.5 ppgVis: 48 sec Finish N/U BOPE. Test BOPE. P/U tbg spear. Back out lock-down screws in tbg hgr, spear tbg and pull hgr to floor. L/D spear, tbg hgr and 2 tbg pups. C&C mud, monitor well amd pump dry job. POH and L/D badly corroded 3- 1/2" tbg. 0600, 8/18/01 -0600, 8/19/01 MW: 12.8 ppgVis: 45 sec POH w/add'l tbg. Total of 4,076' recovered. M/U overshot and washpipe. RIH, tag scale at 2,050'. Work to 2,500'. Circ out scale and gas at 2,500'. POH, L/D overshot and washpipe. P/U 6" bit and RIH. Wash & ream from 2,450' to 2,721' and from 3,884' to 4,071' Circ out scale. POH, L/D bit, P/U washpipe, RIH. Tag top of fish at 4,076'. Attempt to wash over. 0600, 8/19/01 - 0600, 8/20/01 MW: 12.8 ppgVis: 45 sec Wash over fish and jar on same. POH. Recover 5 jts tbg plus parted pieces. TOF at 4,266'. Service BHA and RIH. Tag TOF at 4,266'. Work over and jar on fish. POH. Recover 3 jts tbg plus parted pieces. Service BIlA and RIH. Tag TOF at 4,375'. 0600, 8/20/01 - 0600, 8/21/01 MW: 12.2 ppgVis: 43 sec Work over fish and jar. POH. Recover 4 jts tbg plus parted pieces. M/U 6" bit and scaper. RIH, tag TOF at 4,540'. POH. P/U bridge plug and RIH. Set at 4,536'. Place 225 sx Class G cement plug on top of bridge plug. Reverse out DP and POH. L/D BP running tool, N/D riser to remove tbg spool. 0600, 8/21/01 - 0600, 8/22/01 MW: 11.5 ppgVis: 40 sec N/D flow nipple and riser. Remove tbg spool. Tack weld 7" csg slips to 7" csg. N/U riser and BOPE. Test BOPs to 3,000 psi. P/U 6" bit, RIH to 4,270' TOC. Set 15,000 lbs wt on cmt w/pumps running - cmt hard. Set 13.5+ ppg mud on top of cmt plug and POH, laying down 3-1/2" DP. 0600, 8/22/01 -0600, 8/23/01 MW: 11.0 ppgVis: 45 sec M/U Baker csg cutter and RIH to 3,750'. Cut 7" csg at 3,750'. Circ 7" x 9- 5/8" annulus w/mud and monitor well - dead. POH, L/D csg cutter. M/U 7" csg spear, spear top of 7" csg, unseat slips. Circ around 7" csg. Monitor well - dead. Pull and L/D 7" csg. R/D csg tools and clear floor, set wear ring. M/U 8-1/2" bit and 9-5/8" csg scraper. RIH and tag top ofT' csg at 3,752'. CBU. 0600, 8/23/01 - 0600, 8/24/01 MW: 10.6 ppg Vis: 44 sec POH and L/D scraper assy. RIH w/9-5/8" cmt retainer on WL. Log collars, tag stub and set retainer at 3,700' WLM. POH and RJD WL. P/U and RIH w/ cmt retainer stinger. R/U to cement. Sting into retainer and perform injection test. 4 BPM at 2,654 psi. Mix and displace 10 bbls Class G (w/ additives) cement through retainer, then pull up and place 18 bbls Class G (w/ additives) cmt on top of retainer. Pull up, reverse out and POH, laying down 3-1/2" DP. 0600, 8/24/01 - 0600, 8/25/01 MW: 9.0 ppg Vis: 50 sec R/U drill floor for handling 5" DP. Dress BOP stack w/5" rams and test doors to 3,000 psi- OK. M/U 8-1/2 "bit on 5" DP and RIH. Tag cmt at 3,522'. Drill firm cmt and polish to 3,545'. POH, backload boat and prepare for BOP test. Note: See Well Completion Report for MGS Well A34-14LW sidetrack for remainder of operations. PLUGGING & LOCATION CLEA_~_MCE REPORT Sta~a cf Alaska 0iL & GAS C-'~S~TATION CCESSION Review the we!! fi!e, a.:d' cc:rune:: c: pluqc~~, well head s~:~m,A ~ !ocm~i:: c~ea~ce'- ~r~e ~. clear. Loca:!cn C[e~ce: , October-2001 DATE & NOTES 01-Oct-2001 02-Oct-2001 03-Oc~-2001 A34-14 INJ INJ ANNU 0 0 0 0 0 0 A41A-I ILN INJ INJ ANNU 619 3600 630 3600 637 3600 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL A44-11 Al 1-13R2 490 1400 100[ 231 3600 25 0 500 100~ 236 3600 25 0 500 1001 254 3600 25 AIl-12 I 706 3600 550[ 752 3600 550I 781 3600 550~ I I A33-14 A44-02 570 3600 350 760 3600 280I 04-0ct-2001 05-Oct-200l 06-0ct-200 07-0ct-2001 08-0ct-200 09-Oct-2001 10--Oct-2001 I I-O~t-2001 12-0ct-200 13-0ct-200 14-Oct-200 15-Oct-200 16-Oct-200 17-Oct-200 18 -Oct- 200 19-Oct-200 20-Ocl-200 21 -Oct-200 22-Oc~-200 23-Oct-200 24-Oc~-200 25-OCt-200 26-Oct-2001 27-Oct-200 28-0ct-2001 29-OCt-2001 30-Oct-200 31 -Oct-200 TOTAL MAXIMUM AVERAGE # DAYS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11113/2001 0 0 0 0 612 3600 623 3600 625 3600 634 3600 634 3600 627 3600 615 3600 623 3600 602 3600 606 3600 598 3600 602 3600 609 3600 606 3600 605 3600 593 3600 592 3600 611 3600 593 3600 595 3600 589 3600 572 3625 571 3625 562 360 586 3625 577 3625 586 3625 566 3625 0 18.700 3.625 0 603 3.500 0 450 1400 10(3 0 500 100 450 1500 100 460 1800 100 0 500 100 600 1600 100 0 500 90 0 500 90 490 1600 120 0 50 120 0 600 110 1458 1700 110 250 1500 110 1966 1800 110 629 1600 50 0 1850 70 0 750 80 584 1700 100 0 1200 50 0 1200 50 0 600 100 0 550 120 0 500 110 534 1700 110 0 1000 70 0 1000 100 0 650 110 0 350 110 8.361 1.850 120 270 1.052 96 261 3600 25 225 3600 25 201 3600 30 233 36O0 30 334 3600 30 353 3600 30 336 3600 25 305 3600 25 242 3600 50 220 3600 50 229 3600 25 221 3600 25 250 3600 25 253 3600 25 216 3600 30 211 3600 30 255 3600 25 306 3600 25 291 3600 25 300 3650 25 334 3600 25 335 3625 25 319 3650 20 328 3625 20 324 3625 20 293 3625 20 275 3625 25 261 3625 25 8.432 3.650 50 272 3,608 27 764 3600 550 762 3600 550 748 3600 525 755 3600 525 747 3600 525 749 3600 525 746 3600 500 721 3600 500 693 3600 520 678 3600 520 697 3600 500 677 3600 500 683 3600 500 693 3600 500 687 3600 500 702 3600 500 705 3650 450 701 3625 450 701 3650 450 687 3650 450 697 3650 450 688 3625 450 695 3625 450 685 3625 425 713 3625 400 687 3625 420 693 3625 420 688 3625 400 22.081 3.650 550 712 3.613 487 645 3600 300 644 3600 300 625 3600 300 640 3600 300 624 36O0 300 634 3600 300 632 3600 300 589 36O0 300 558 3600 300 549 3600 300 574 3600 300 555 3600 300 563 3600 300 573 3600 280 572 3600 280 599 3600 275 599 3650 275 596 3600 225 589 3650 250 576 3650 25O 590 365O 25O 582 3650 250 590 3650 225 579 3650 210' 602 3650 200 584 3650 2101 592 3650 2101 593 3650 2~01 18.536 3.650 375 598 3.618 277 ~,34-14 shut in for upcoming rig work. 777 3600 250 790 3600 250 758 3600 240 771 3600 240 766 3600 25O 766 36O0 250 771 3600 275 755 3600 275 754 3600 230 724 3600 230 761 36O0 220 741 3600 220 752 3600 22( 754 3600 21( 745 3600 20( 756 3650 19( 760 3650 17( 768 3650 16( 752 3650 17( 750 3650 16( 755 3650 16( 748 3650 15( 769 3650 14( 768 3650 13( 791 3650 11~ 768 3650 12( 782 3650 12( 767 3650 11£ 23.692 3,650 285 764 3.621 202 September-200 I DATE & NOTES 01-Sep-2001 02-Sep-200! 03-Sep-200 I 04-Sep-200 I 05-Sep-200 I 06-Sep-200l 07-Sep-2001 08-Sep-200 ! 09-Sep--200 I 10-Sep-200 I I I -Sep-200 I 12-Sep-200 I 13-Sep-200 ! 14-Sep-200 I 15-Sep-200 I 16-Sep-200 I 17-S¢p-200 I 18-Sep-200 I 19-Sep-200 I 20-Sep-200 I 2 l-Sep-200 ! 22-Sep-2001 23-Sep-200 I 24-Sep-200 ! 25-Sep-200 ! 26-Sep-200 ! 27-Sep-200 i 28-Sep-200 ! 29-Sep-200 I 30-Sep-2001 TOTAL MAXIMUM AVERAGE #DAYS 10/15/2001 A34-14 INJ INJ ANNU 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 A41A-I ILN INJ INJ ANNU 615 3600 611 3600 612 3600 607 3600 618 3600 615 3600 620 3600 613 3600 WATER INJECTION REPORT PLATFORM A , 0 475 13C 390 3600 20 742 3600 600 0 350 13C 395 3600 20 737 3600 600 0 300 14C 415 3600 20 737 3600 600 0 250 I~ 410 3600 20 735 3600 625 467 1600 13C 416 3600 20 740 3600 625 0 250 13C 408 3600 20 735 3600 600 0 250 13~3 395 3600 20 737 3600 600 0 250 13~3 394 3600 20 732 3600 600 I ! 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 613 3600 612 3600 611 3600 608 3600 6O9 36OO 614 3600 6O4 36O0 616 3600 607 3600 6O4 3600 633 3600 622 3600 622 360O 627 3600 622 3600 624 3600 620 3600 619 36O0 622 3600 622 3600 610 3600 618 36O0 18,470 3,600 616 3,600 496 1500 13C 0 250 13C 0 250 13~ 382 1600 13~ 527 1500 13~ 385 1700 13~ 0 250 13C 280 1600 13~ 735 1600 13~ 0 250 13C 1057 1600 130 490 1550 I0~ 0 I00 10~ IlO0 1500 12~ 0 600 12C 621 1600 12g 440 1500 10~ 0 500 I0~ 405 1600 10~ 0 !00 0 500 IO3 440 1750 !0~ 7,825 1,750 140 261 904 122 394 3600 20 363 3600 20 336 3600 20 334 36OO 20 338 3600 20 338 3600 20 326 3600 20 329 36OO 2O 339 3600 20 326 3600 20 302 3600 20 280 3600 20 321 3600 20 337 3600 20 290 3600 20 275 3600 20 256 3600 25 255 3600 25 248 36O0 25 321 3600 2~ 257 3600 25 235 3600 25 10,023 3,600 25 334 3,600 21 730 3600 600 732 3600 600 729 3600 600 723 3600 600 725 3600 600 722 3600 600 716 3600 600 726 3600 600 717 3600 600 713 36OO 600 717 3600 600 712 3600 600 713 3600 600 719 3600 575 713 3600 575 713 3600 575 704 3600 575 704 3600 575 710 3600 550 713 3600 60~ 708 36O0 550 699 3600 550 21,653 3,600 625 722 3,600593 A33-14 A44-02 55:52 33~6~0 33:55[ :6538 33~ 33:~ a 562 · 3600 375 565 3600 27~ 571 3600 35( 564 3600 35( 571 3600 35( 568 3600 35( 562 3600 35( 571 3600 35£ 566 3600 35( 559 3600 35( 566 36OO 35( 561 3600 35( 559 36OO 35( 570 360O 35( 562 360O 35( 555 36O0 35( 563 3600 35( 559 3600 35( 562 3600 35( 570 3600 356 · 564 3600 35 564 3600 35 556 3600 350 556 3600 356 565 3600 350 562 3600 350 568 3600 350 554 36OO 350 · . 16,902 ' 3,600 375 563 3,600 350 752 3600 3R 763 3600 31C 771 3600 31C 771 3600 30( 755 3600 30( 765 3600 30( 766 3600 30( 779 3600 30( 776 3600 30( 772 3600 30( 780 36O0 30( 767 360O 3O( 758 36O0 30( 777 3600 30( 754 3600 295 764 3600 295 762 3600 295 775 3600 29C 767 3600 28 ~ 774 36OO 27( , 767 3600 28£ 773 3600 28£ 771 3600 28( 771 3600 28( 781 3600 28C 767 3600 28( 757 3600 28C 770 3600 28C 23,026 3,600 31~ 768 3,600 294 at34-14 shut in for upcoming rig work. Augus{-2001 DATE & NOTES · ' 0 l-Aug-2001 02-Aug-2001 03-Aug-2001 04-Aug-2001 05-Aug-200 1 06-Aug-2001 07-Aug-2001 08-Aug~200 I 09-Aug-2001 10-Aug-2001 1 l-Aug-200 I 12-Aug-2001 I YAug-200 l 14-Aug-2001 15-Aug-2001 16-Aug-2001 17-Aug-2001 18-Aug-200 I 19-Aug-2001 20-Aug-2001 2 l-Aug-2001 22-Aug-200 I 23-Aug-2001 24-Aug-2001 25-Aug-2001 26-Aug-2001 27-Aug-2001 28-Aug-200 I 29-Aug-2001 30-Aug-2001 3 l-Aug-2001 TOTAL MAXIMUM AVERAGE # DAYS A34-14 ACT [ INJ INJ ANNU 0 1600 160(I 0 1610 16113 0 1610 16113 0 1440 1440 0 1400 140( 0 1370 137( 0 1360 136( 0 1360 136( 0 1360 136( 0 1400 140( 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 100 100 0 100 1013 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,610 1,610 0 700 700 WATER INJECTION REPORT PLATFORM A A41A-IILN INJ INJ ANNU 613 3600 613 3600 618 3600 621 3600 0! 491 1700 120 606 3600 0 0 150 120 620 3600 0 150 620 3600 0 150 1213 618 3600 50 1500 1213 618 3600 2160 1600 12~ 617 3600 1301 1800 12£ 629 3600 378 1600 12£ 613 3600 367 1600 12( 514 3600 0 150 120 608 3600 0 150 120 602 3600 415 1500 120 611 3600 0 150 120 607 3600 0 150 120 616 3600 O' 0 150 120 613 3600 0 0 150 120 614 3600 0 520 1500 120 597 3600 0 0 150 120 601 3600 0 0 150 120 599 3600 493 1500 1413 611 3600 430 1500 120 614 3600 611 1600 10( 610 3600 0 550 12E 607 3600 0 400 12£ 609 3600 320 1500 13£ 603 3600 0 700 12( 615 3600 456 1500 130 615 3600 0 400 130 09/12/2001 18,872 3.600 609 3,600 DISPOSAl, WELL I I INJ INJ ANNU INJ INJ ANNU INJ IN.I ANNU 0 700 1oo[ 268 3600 201 822 3600 60( 0 700 1ooI 273 3600 201 822 3600 60( 0 700 1001 274 3600 20[ 817 3600 60( I A33-14 ACT I INJ INJ ANNU 550 3600 350 556 3600 350 562 3600 350 279 3600 213 273 3600 283 36OO 2£ 283 3600 276 3600 281 3600 2( 277 3600 2( 298 3600 20 289 3600 20 240 3600 20 343 3600 20 272 3600 20 293 3600 20 304 3600 20 318 3600 40 307 3600 213 305 3600 20 331 3600 2C 350 3600 2~ 348 3600 2( 336 3600 2( 317 36OO 2( 349 3600 2( 337 3600 2( 346 36OO 2OI 361 3600 20: 36O 360O 20 381 3600 20 818 3600 60( 810 3600 60( 806 3600 799 3600 600 796 3600 600 797 3600 600 785 360O 600 831 3600 600 813 3600 600 643 3600 550 792 3600 550 804 3600 5513 801 3600 60( 794 3600 60( 795 3600 60( 791 3600 60t2 777 3600 60( 762 3600 60( 772 3600 600 755 3600 600 761 3600 600 755 3600 600 753 3600 600 748 3600 600 746 3600 650 737 3600 650 744 3600 625 747 3600 625 7,992 1,800 140 258 845 119 9,552 3,600 40 308 3,600 21 24,193 3.600 650 780 3,600 600 565 3600 350 559 3600 350 559 3600 350 553 3600 375 558 3600 35C 558 3600 35¢ 551 36OO 40( 618 3600 40( 586 3600 40( 505 3600 26( 600 3600 260: 607 3600 260 604 3600 350 600 3600 350 603 3600 350 592 3600 350 581 3600 350 567 3600 350 582 3600 350 559 3600 40( 576 3600 375 570 3600 375 566 3600 375 565 3600 375 564 3600 40£ 556 3600 375 566 3600 37~ 569 3600 375 17,707 3,600 400 571 3,600 356 A44-02 ACT . INJ [NJ ANNU 751 3600 265 762 3600 285 760 3600 285 761 3600 282 756 3600 285 748 3600 29( 749 3600 295 756 3600 295 752 3600 295 746 3600 300 783 3600 300 763 3600 2913 662 3600 260 823 3600 260 799 3600 26£ 805 3600 288 783 3600 28~ 787 3600 292 780 3600 29( 768 3600 29( 752 3600 30( 770 3600 316 754 3600 320 748 3600 330 755 3600 320 752 3600 330 754 3600 330 763 3600 340 763 3600 320 773 3600 320 774 3600 320 23,652 3,600 340 763 3,600 298 ,34-14 shut in for upcoming rig work. July-2001 01-Jul-2001 02-Jul-2001 03-Jul-2001 04-Jul-2001 05-Jul-2001 06-Jul-2001 07-Jul-2001 08-Jul-2001 09-Jul-2001 10-Jul-2001 11 -Jul-2001 12-Jul-2001 13-$ul-2001 14-Jul-2001 15-Jul-2001 16-Jul-2001 17-Jul-2001 18-Jul-2001 19-Jul-2001 20-Jul-2001 21-Jul-2001 22-Jul-2001 23-Jul-2001 24-Jul-2001 25-Jul-2001 26-$ul-2001 27-Jul-2001 28-Jul-2001 29-Jul-2001 30-Jul-2001 3 l-Jul-2001 TOTAL MAXIMUM AVERAGE #DAYS A34-14 I INJ INJ ANNU 0 1600 170~ 0 50 lOC 0 250 22C 0 350 34~ 0 490 4712 0 500 4712 0 500 55C 0 650 6612 0 800 80( 0 910 91( 0 1000 102( 0 1000 !10( 0 1200 120{ 0 1250 1260: 0 1300 1300 0 1350 1370 0 1400 1400 0 1400 1400 0 1440 1440 0 1460 1460 0 1480 1480 0 1500 1500 0 1520 1520 0 1540 154(1 0 1560 15613 0 1570 15713 0 1590 159~ 0 1600 160~ 0 1600 160~ 0 1600 160~ 0 1600 16(K 0 1,600 1,7013 0 1,163 1,172 iA41A-IILN INJ INJ ANNU 554 3600 550 3600 551 3600 551 3600 556 3600 561 3600 573 3600 571 3600 566 3600 574 3600 571 3600 572 3600 563 3600 575 3600 574 36O0 572 3600 573 3600 578 3600 582 3600 480 36OO 633 3600 634 3600 600 3600 599 3600 621 3600 628 3600 635 3600 627 3600 626 3600 623 3600 631 3600 WATER INJECTION REPORT PLATFORM A DISPOSAL WELL A44-11 AII-13R2 INJ INJ ANNU 305 3600 213 309 3600 20 321 3600 213 322 3600 2~ 323 3600 2~ 311 3600 20 314 3600 2~ 312 3600 2¢ 312 3600 2C 315 3600 2C 314 3600 2C 331 3600 2C 320 360O 2C 313 3600 2C 314 36O0 2( 295 3600 20! 303 3600 20 266 3600 20 244 3600 20 206 3600 20 277 3600 20 292 3600 20 285 3600 20 286 3600 20 281 3600 20 278 3600 20 276 3600 20 273 3600 20 280 3600 20 270 3600 213 262 3600 213 INJ INJ ANNU INJ INJ ANNU INJ INJ ANN INJ INJ ANNU 1149 3600 450 0 0 ' 585 3600 250' 769 360013:~ 1112 3600 450 1096 3600 450 1083 36OO 450 1072 3600 475 1045 360O 500 1036 3600 500 1022 3600 500 1007 3600 500 1010 3600 525 1013 3600 525 1047 3600 500 1003 3600 500 1002 3600 500 997 3600 500 978 3600 500 971 360O 500 971 3600 500 964 3600 50~ 793 3600 50~ 872 3600 50~ 885 3600 50~ 863 3600 50~ 858 3600 50f 866 3600 5512 849 3600 575 849 3600 60( 843 3600 60( 838 3600 600 835 3600 600 840 3600 600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18,104 3,600 584 3,600 INJ INJ ANNU 931 1500 90 1213 1600 50 468 1800 80 0 0 80 0 0 60 667 1800 100 0 0 100 0 0 1113 381 1650 1113 0 0 1113 444 1700 110 367 1600 110 0 0 0 0 110 0 378 1850 0 405 1800 I lC 0 0 0 11¢ 0 0 1112 405 1600 llC 375 1600 Ill 0 0 11£ 362 1500 !1( 0 0 110 0 0 110 407 1500 110 0 0 120 405 1400 120 0 0 120 0 0 120 0 0 120 440 1500 120 7,648 1,850 120 247 787 105 9,110 3,600 20 294 3,600 20 29,769 3,600 600 960 3,600 515 580 3600 250 582 3600 250 578 3600 250 573 3600 250 573 3600 250 571 3600 300 569 3600 300 569 3600 300 574 3600 300 594 3600 300 640 3600 255 603 3600 250 603 3600 2513 607 3600 2513 595 3600 30~ 597 36OO 30~ 605 3600 30~ 610 3600 30~ 494 3600 30~ 589 3600 275 567 3600 30f 555 3600 30( 557 3600 325 565 3600 35( 556 3600 35( 558 3600 35( 557 36OO 35( 567 3600 350 547 3600 350 565 3600 350 17,885 3,600 350 577 3,600 295 751 3600 135 738 3600 140 741 3600 145 740 3600 150 732 3600 158 733 3600 175 747 3600 184 737 3600 187 756 3600 191 768 3600 196 746 3600 18¢ 727 3600 184 738 3600 184 762 3600 184 777 3600 184 781 3600 184 779 3600 22£ 768 3600 21~ ~ 625 3600 21( 780 3600 17( 770 3600 20[ 736 3600 22~ 723 3600 23( 772 3600 239 771 3600 246 775 3600 252 773 3600 258 764 3600 254 762 3600 258 778 3600 260 23,319 3,600 260 752 3,600 199 08/14/2001 A23-01R shut in as it is now being convened to a producer A34-14 shut in for upcomi~ WATER INJECTION REPORT PLATFORM A ~ ' May-200 I DATE & No'rE~ · · 01 -May-200 ! 02-May-200 I 03-May-2001 04-May-2001 05-May-200 i 06-May-2001 07-May-2001 08-May-2001 09-May-2001 O-May-200 I I-May-2001 12-May-2001 3-May-200 I 14-May-200 I ! 5-May-2001 6-May-2001 17-May-2001 8-May-200 ! 9-May-200 ! 20-May-2001 2 l-May-2001 22-May-2001 23-May-200 ! 24-May-2001 25-May-200 ! 26-May-200 ! 27-May-200 ! 28-May-2001 29-May-2001 30-May-200 ! l-Ma),-2001 TOTAL MAXIMUM AVERAGE #DAYS A34-14 INJ [NJ ANNU 975 3650 3650 978 3650 3650 988 3650 3650 964 3650 3650 970 3650 3650 954 3650 365( 967 3650 365( 950 3650 365( 947 3650 365( 952 3650 365( 953 3650 365( 952 3650 365{ 949 3650 365C 954 3650 365C 948 3650 365C 954 3650 365C 956 3650 365C 948 3650 365£ 435 3650 365C 889 3600 355C 952 3650 365¢ 957 3650 365C 955 3650 365C 840 3650 365C 1005 3650 365~ 976 3650 365~ 958 3650 365~ 952 3650 365~ 956 3650 3650 964 3650 3650 950 3650 3650 29,048 3,650 3,650 937 3,648 3,647 A41A-I ILN [NJ [NJ ANNU 564 3625 566 3~0 579 3650 5~ 3650 538 3650 551 3650 550 3650 475 3~0 480 3650 483 3~0 476 3650 535 3650 535 3650 518 3650 498 3~0 503 3~0 526 3~0 508 3650 236 3650 525 3600 484 3650 516 3650 518 365O 447 3650 489 3~0 488 365O 476 3650 484 3~0 481 3650 487 3650 493 3650 7 15,574 3,650 75 502 3,648 2 06/13/2001 t~23-01R shut in as it is now being converted to a producer DISPOSAL WELL A44-11 ACT [ INJ ]ANNU[NJ 0 50 9~ 0 50 8~ 0 50 80 0 50 80 0 50 9~ 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 0 50 90 664 1700 100 375 1600 140 0 50 90 0 50 90 0 50 90 449 1700 100 0 50 90 460 1700 225 0 50 90 465 1700 200 0 50 90 390 1750 160 0 50 90 2,803 1,750 225 90 368 1011 AlI-13R2 [NJ INJ ANNU 362 3650 15 406 3650 I0 421 3650 I0 405 3650 10 395 3650 10 382 3650 l0 363 3650 10 335 3650 l0 333 3650 10 357 3650 10 377 3650 10 377 3650 i0 374 3650 10 376 3650 10 364 3650 l0 351 3650 10 362 3650 15 369 3650 15 168 3650 15 248 3600 20 337 3650 15 362 3650 20 372 3650 20 310 3650 12 319 3650 15 333 3650 15 332 3650 15 337 3650 15 357 3650 15 352 3650 15 340 3650 15 AIl-12 [NJ [NJ ANN 0 1775 90(3 0 1775 89(] 0 1800 90~ 0 1775 90(] 0 1775 900 0 1775 900 0 1775 900 0 1775 900 0 1775 900 0 1775 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 900 0 1750 875 0 1750 900 0 1750 900 0 1750 790 0 1750 880 0 1750 880 0 1750 880 0 1750 875 0 1750 875 0 1750 875 0 1750 900 A23-01R ] INJ INJ ANNU 0 1150 0 !150 0 !!50 0 1150 0 1150 0 !150 0 Il50 0 550 0 300 0 300 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10,876 3,650 2C 351 3,648 13 0 1,800 900 0 1,759 891 0 1,150 0 297 A33-14 [ A44-02 I I 652 3650 800 3650 659' 3650 795 3650 666 3650 800 3650 654 3650 784 3650 644 3650 819 3650 633 3650 819 3650 641 3650 820 3650 632 3650 786 3650 634 3650 781 3650 630 3650 823 3650 637 3650 20 824 3650 629 3650 20 823 3650 628 3650 20 815 3650 624 3650 20 808 3650 613 3650 20 806 3650 622 3650 20 811 3650 625 3650 20 809 3650 618 3650 20 806 3650 279 3650 20 345 3650 603 3600 100 751 3600 647 3650 '659 3650 663 3650 573 3650 738 3650 683 3650 671 3650 647 3650 664 3650 666 3650 667 3650 19,601 15 808 3650 50 820 3650 50 837 3650 10 688 3650 5 846 3650 l0 824 3650 10 812 3650 15 808 3650 15 793 3650 15 807 3650 50 809 3650 24,477 3,650 I00 3,650 0 632 3,648 18 790 3,648 0 31 31 April-2001 DATE & NOTES 01-A 9r-200 I 02-A ,r-200 I 03-A ~r-2001 04-A ~r-200 I 05-A ~r-2001 06-A ~r-200 I 07-A ~r-200 I 08-^ ~r-2001 09-^ ~r-200 I 10-A ~r-2001 I 1-^ ~r-200 1 12-^ ~r-200 I 13-A ~r-2001 I O,-A: ~r-2001 15-A' ~r-200 I 16-A ~r-2001 17-A ~r-2001 18-A ~r-200 I 19-A ~r-2001 20-A ~r-200 I 2 I-A ~r-200 I 22-A ~r-200 I 23-A ~r-2001 24-A ~r-200 I 25-A ~r-2001 26-A x-200 I 27-A ~r-200 I 28-A ~r-2001 29-A >r-2001 30-A ,r-2001 TOTAL MAXIMUM AVERAGE #DAYS 05/I 5/2001 A34-14 ACT I INJ INJ ANNU 937 3650 3650 978 3650 3650 980 3650 3650 986 3650 3650 992 3650 365C 969 3650 365C 981 3650 365~ 981 3650 365~ 979 3650 365¢ 979 3650 365C 969 3650 365~ 982 3650 365( 980 3650 365( 983 3650 365( 975 3650 365( A41A-IILN WATER INJECTION REPORT PLATFORM A DISPOSAL WELL A44-11 ~J ~J ANNU ~J ~J ANNU 759 3650 0 200 65 778 3650 0 200 65 796 3650 0 750 20 761 3650 0 200 60 0 0 0 200 70 382 3600 0 0 150 80 413 3600 0 0 1000 40 397 36O0 0 0 200 66 385 3600 0 0 300 ~ 374 3625 0 0 150 ~ 337 3625 0 0 150 ~ 300 3650 0 150 7~ 3~ 3650 0 150 7~ 370 3650 0 150 7C 257 3650 0 75 ~ AlI-13R2 ~J ANNU 369 3650 10 382 3650 10 371 3650 10 372 3650 10 379 3650 15 361 3650 15 362 3650 15 356 3650 lC 368 3650 1~ 365 3650 lC 365 3650 1£ 366 3650 IC 373 3650 !~ 375 3650 1£ 379 3650 1£ Ali-12 INJ ANNU 1725 1000 1725 1000 1750 1000 1775 975 1800 925 1800 900 1800 900 1800 900 1800 900 1800 900 1800 900 1750 90 1750 900 1750 900 1750 900 A23-01R INJ INJ ANNU 0 1175 1175 0 1175 1175 0 1175 1175 0 1175 1175 0 1200 1200 0 1200 1200 0 1200 1200 0 1200 120(1 0 1200 1200 0 1200 120(] 0 1200 1200 0 1200 1175 0 1200 115~3 0 1200 115~3 0 1175 1175 971 3650 365( 968 3650 3650 983 3650 3650 992 3650 3650 966 3650 3650 979 3650 3650 978 3650 3650 972 3650 3650 972 3650 3650 962 3650 3650 978 3650 3650 977 3650 3650 967 3650 3650 981 3650 3650 973 3650 365~ 29,270 3,650 3,650 976 3,650 3,650 305 3650 308 3650 311 3650 323 3650 301 3650 312 3650 324 3650 296 3650 294 365O 288 365O 298 3650 208 3650 0 3650 630 3600 581 3625 11,432 3,650 381 3,518 0 75 7C 0 0 8C 0 0 0 0 8( 0 0 9ff 0 0 90 0 0 90 0 0 90 0 0 90 0 0 90 0 0 85 0 50 80 0 50 90 0 50 90 0 50 90 0 1,000 90 0 143 74 368 3650 1( 380 3650 1( 383 3650 1( 397 3650 10 391 3650 10 392 3650 10 397 3650 10 395 3650 10 394 3650 10 384 3650 10 394 3650 12 390 3650 10 395 3650 10 393 3650 10 371 3650 15 11,367 3,650 15 379 3,650 11 0 1750 900 0 1750 900 0 1750 900 0 1750 90~ 0 1750 900 0 1750 90~ 0 1750 90~ 0 1750 90( 0 1750 90( 0 1750 90( 0 1775 88C 0 1750 90( 0 1750 90( 0 1775 90( 0 1775 90( 0 1,800 1,00( 0 1,763 886 0 1200 115C 0 1200 115C 0 1150 115C 0 1150 120( 0 1150 115£ 0 1150 115( 0 1150 115( 0 1150 115( 0 1150 115( 0 1150 115( 0 1150 1150 0 1150 i150 0 1150 1150 0 1150 1150 0 1150 1150 0 1,200 1,200 0 1,174 1,168 ,il A33-14 A44-02 INJ INJ ANNU INJ INJ ANNU 633 3650 691 3650 660 3650 720 3650 661 3650 708 3650 655 3650 ff 720 3650 667 3650 0! 785 3650 652 3650 0 714 3650 661 3650 756 3650 658 3650 760 3650 658 3650 760 3650 660 3650 758 3650 651 3650 762 3650 660 3650 779 3650 658 3650 770 3650 663 3650 758 3650 648 3650 763 3650 646 3650 789 3650 646 3650 3 810 3650 659 3650 25 809 3650 671 3650 786 3650 647 3650 769 3650 658 3650 799 3650 659 3650 811 3650 649 3650 813 3650 649 3650 815 3650 639 3650 801 3650 655 3650 798 3650 657 3650 813 3650 651 3650 815 3650 655 3650 795 3650 652 3650 785 3650 19,638 23,212 3,650 3{ 3,650 655 3,650 3 774 3,650 A23-01R and Al 1 - 12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. / WATER INJECTION REPORT PLATFORM A DISPOSAL WELL March-2001 A34-14 A41 A- 11LN A44-11 A 1 I- 13 R2 A 11 - 12 A23-01R A33-14 A44-02 i iiiii~ ~i~.~ili i i iii iiiiii!iiiil ][NJ INJ ANNU INJ [NJ ANNU [NJ [NJ ANNU [NJ [NJ ANNU [NJ INJ ANNU [NJ [NJ ANNU [NJ [NJ [NJ [NJ ANI~qu' OI-Mar-2001 1015 3650 365(800 3650 C 326 1600 40 363 3650 0 0 1500 1150 0 1250 125~ 741 3650 742 3650 0 02-Mar-2001 1009 3650 365( 794 3650 ~ 435 1600 60 370 3650 0 0 850 1150 0 1250 120~ 722 3650 733 3650 0 03-Mar-2001 989 3650 365( 782 3650 C 365 1600 25 386 3650 0 0 850 1150 0 1250 1250 702 3650 737 3650 04-Mar-2001 986 3650 365( 774 3650 ~ 453 1800 25 390 3650 0 0 1000 1150 0 1250 1250 693 3650 743 3650 05-Mar-2001 999 3650 365( 789 3650 ~ 1170 650 25395 3650 0 0 1000 1200 0 1250 125fl 698 3650 765 3650 06-Mar-2001 984 3650 365( 771 3650 C 618 1700 20 391 3650 0 0 1100 1150 0 1250 1250 674 3650 710 3650 07-Mar-2001 997 3650 365( 781 3650 ~ 490 1700 40 321 3650 0 0 1100 1150 0 1250 1250 671 3650 803 3650 08-Mar-2001 987 3650 365( 754 3650 C 0 700 50 340 3650 0 0 900 1200 0 1250 1250 665 3650 ( 763 3650 09-Mar-2001 990 3650 365( 783 3650 £ 370 1700 60 379 3650 0 0 900 1200 0 1200 120fl 673 3650 748 3650 10-Mar-2001 983 3650 365( 797 3650 ~ 0 700 50 387 3650 0 0 900 1200 0 1200 1200 655 3650 728 3650 II-Mar-2001 990 3650 365( 810 3650 C 340 1800 60 394 3650 0 0 900 1200 0 1200 1200 662 3650 730 3650 12-Mar-2001 977 3650 365{ 801 3650 £ 0 700 60 377 3650 0 0 900 1200 0 1200 120~ 663 3650 ~ 710 3650 13-Mar-2001 995 3650 365( 813 3650 £ 924 1800 60 386 3650 0 0 900 1200 0 1200 120~ 674 3650 ~ 731 3650 14-Mar-2001 973 3650 365( 767 3650 £ 0 700 60 369 3650 0 0 900 1200 0 1200 120C 655 3650 0 718 3650 15-Mar-2001 993 3650 365( 784 3650 £ 750 1800 60 379 3650 0 0 1025 1200 0 1225 1225 675 3650 0 760 3650 0 16-Mar-2001 976 3650 365( 771 3625 £ 346 1800 40 376 3650 0 0 1225 1175 0 1225 1225 658 3650 0 747 3650 0 17-Mar-2001 989 3650 365( 778 3650 £ 423 1800 40 365 3650 0 0 1225 1150 0 1225 1225 668 3650 0 741 365~ 0 18-Mar-2001 987 3650 365{ 789 3650 { 0 925 20 375 3650 0 0 1225 1150 0 1225 120C 670 3650 0 758 3 ~0 19-Mar-2001 994 3650 3650 804 3650 ( 0 875 20 390 3650 0 0 1225 1150 0 1225 120C 676 3650 0 738 3~ 20-Mar-2001 974 3650 3650 769 3625 ( 0 875 60 368 3650 0 0 1000 1200 0 1225 122 657 3650 0 725 3650 0 21-Mar-2001 992 3650 3650 791 3625 { 0 650 60 368 3650 0 0 1000 1250 0 1225 120£ 672 3650 0 745 3650 0 22-Mar-2001 998 3650 3650 810 3625 ( 0 650 60 406 3650 0 0 1000 120C 0 1200 120( 683 3650 0 757 3650 0 23-Mar-2001 996 3650 3650 811 3625 ( 424 1750 60 407 3650 0 0 1000 1200 0 1200 120( 685 3650 0 763 3650 0 24-Mar-2001 986 3650 3650 786 3625 ( 457 1700 60 395 3650 0 0 1000 120~ 0 1200 120£ 669 3650 0 726 3650 0 25-Mar-2001 979 3650 3650 778 3625 ( 0 650 60 385 3650 0 0 1000 120~ 0 1200 120£ 658 3650 0 728 3650 0 26-Mar-2001 977 3650 3650 818 3625 ( 0 650 60 374 3650 0 0 1000 120~ 0 1200 120( 656 3650 0 718 3650 0 27-Mar-2001 980 3650 3650 809 3625 ( 0 650 60 385 3650 0 0 1000 1200 0 1200 120( 660 3650 0 718 3650 0 28-Mar-2001 974 3650 3650 821 3625 ( 0 650 60 384 3650 0 0 1000 120~ 0 1200 120( 656 3650 0 717 3650 0 29-Mar-2001 989 3650 3650 820 3650 ( 254 1700 60 384 3650 0 0 850 1225 0 1200 120( 665 3650 0 717 3650 0 30-Mar-2001 978 3650 3650 769 3650 ~ 0 650 65 383 3650 0 0 850 125~ 0 1200 120( 661 3650 0 718 3650 0 31-Mar-2001 995 3650 3650 787 3650 0 0 400 40 387 3650 0 0 1650 I10C 0 1200 1175 668 3650 0 714 3650 TOTAL 30,631 24,511 8,145 11,759 0 0 20,885 22,851 MAXIMUM 3,650 3,650 3,650 0 1,800 65 3,650 0 1,650 1,250 1,250 1,250 3,650 0 3,650 0 AVERAGE 988 3,650 3,650 791 3,642 0 263 1,191 49 379 3,650 0 0 1,031 1,185 0 1,219 1,214 674 3,650 0 737 3,650 0 # DAYS 31 31 16 31 0 0 31 31 04/12/2001 ..... A23-01R and Al 1-12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A ? ' · Februaw-200 I I' o1.~b-2O61' [ 02-Feb~2001 I 03-Feb-2001 A34-14 ACT INJ [ INJ ANrNU 1030 3650 365C 1032 3650 365£ 1025 3650 365£ DISPOSAL WELL A41A-I 1LN A44-11 Al 1-13R2 761 3650 463 1900 60[ 463 3650 810 3650 1726 1850 20[ 470 3650 798 3650 0 950 201 460 3650 I Al 1-12 A23-01R A12-12 I A33-14 I ACT ACT ACT ACT 0 850 1200 0 1300 1300[ 0 0 0[ 747 3650 0 SS0 110( 0 1300 1300[ 0 0 0[ 750 3650 0 850 115( 0 1300 130~ 0 0 q 745 3650 A44-02 · ACT [ ~ INJ INJ ANNU 716 3650 0 726 3650 0 721 3650 0 04-Feb-2001 05-Feb-2001 06-Feb-20Ol 07-Feb-2001 08-Feb-2001 09-Feb-2001 10-Feb-2001 Il-Feb-2001 12-Feb-2001 13-Feb-2001 14-Feb-2001 15-Feb-2001 16-Feb-2001 17-Feb-2001 18-Feb-2001 19-Feb-2001 20-Feb-20OI 21-Feb-2001 22-Feb-2001 23-Feb-2001 24-Feb~2001 25-Feb-200 I 26-Feb-2001 27-Feb-2001 28-Feb-2001 TOTAL MAXIMUM AVERAGE # DAYS 1031 3650 365( 1036 3650 365( 1022 3650 365( 1033 3650 365( 1033 3650 365( 1024 3650 365( 1020 3650 3650 1027 3650 3650 1026 3650 3650 1021 3650 3650 1017 3650 3650 1034 3650 3650 996 3650 3650 1022 3650 3650 1004 3650 365C 1017 3650 365C 1022 3650 365C 819 3650 365G 1048 3650 360( 1010 3650 360( 999 3650 360( IO13 3650 360( 994 3650 365( 774 3650 365( 1088 3650 365( 28,217 3,650 3,650 1,008 3,650 3,643 799 3650 803 3650 789 3650 800 3650 805 3650 798 3650 795 3650 780 3650 792. 3650 783 3650 788 3650 8i5 3650 762 3650 786 3650 780 3650 775 3650 782 3650 638 3650 825 3650 792 3650 793 3650 808 3650 814 3650 611 3650 839 3650 ..; 21,921 3,650 783 3,650 490 1800 50 0 750 30 0 750 50 619 1800 60 577 1800 40 453 1800 40 0 650 40 433 1800 60 0 800 20 320 1850 60 0 100 60 468 3650 479 3650 459 3650 469 3650 470 3600 463 3650 449 3650 451 3650 456 3650 462 3650 441 3650 0 1100 115{ 0 1000 1160 0 925 1200 0 950 1200 0 1000 1150 0 900 1200 0 900 1200 0 850 1200 0 1050 1150 0 850 1200 0 1850 1050 0 1300 1275 0 1300 1300 0 1300 1300 0 1275 1275 0 1300 1275 0 1250 1250 0 1250 1250 0 1250 125< 0 1250 1250 0 1250 1250 0 1250 1250 625 1750 40 398 1800 50 398 1800 50 375 1800 6C 395 1800 5( 0 650 4( 339 t750 6( 389 1750 4( 0 600 4( 0 600 4( 394 1750 4( 446 1700 4( 339 1750 4( 0 600 4( 9,179 , 0 1,900 60 0 328 1,382 44 18 439 3650 425 3650 432 3650 433 365O 436 3650 443 3650 355 3650 360 3650 339 3650 347 3650 361 3650 360 3650 282 3650 369 3650 11,841 3,650 423 3,648 0 1650 120G 0 1650 120~ 0 875 120C 0 875 120C 0 875 120( 0 875 120( 0 775 1225 0 800 120( 0 800 120( 0 800 120( 0 1200 120£ 0 1200 120( 0 1200 120( 0 1200 120( 0 0 1,850 1,225 0 0 1,025 1,183 0 0 1275 1275 0 1275 1275 0 1275 1275 0 1275 1275 0 1250 125( 0 1250 125( 0 1275 1275 0 1250 125( 0 1250 125{ 0 1250 1250 0 1250 1250 0 1250 1250 0 1250 1250 0 1250 1250 0 1,300 1,300 0 1,268 1,266 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 754 3650 754 365O 742 3650 741 3650 744 3650 732 3650 736 3650 743 3650 738 3650 733 3650 727 3650 738 3650 705 3650 728 3650 724 3650 719 3650 721 3650 570 3650 760 3650 728 3650 713 3650 726 3650 704 3650 546 3650 797 3650 20,265 3,650 724 3,650 745 3650 725 3650 735 3650 726 3650 733 3650 715 3650 722 3650 744 3650 727 3650 714 3650 712 3650 712 3650 716 3650 722 3~-' 730 736 3o~v 707 3650 588 3650 753 3650 725 3650 723 3650 738 3650 702 3650 559 3650 794 3650 20,066 0 3,6500 0 717 3,650 0 28 03/12/2001 A23-01R and A 11-12 shut in to lower the pressure while we are doing a sidetrack on A 14-01 and A24-01. RECEIVED 1 3 001 Alaska Oil & Gas Cons. Commission Anchorage WATER INJECTION REPORT PLATFORM A January-2001 0 l-Jan-2001 02-Jan-2001 03-Jan-2001 04-Jan-200 1 05-Jan-2001 06-Jan-2001 07-Jan-2001 08-Jan-2001 09-Jan-200 1 10-Jan-200 1 1 l-Jan-2001 12-Jan-200 I 13-Jan-200 1 14-Jan-2001 15-Jan-200 ! 16-Jan-2001 17-Jan-2001 18-Jan-2001 19-Jan-2001 20-Jan-2001 21-Jan-200 1 22-Jan-2001 23-Jan-2001 24-Jan-200 1 25-Jan-2001 26-Jan-2001 27-Jan-200 1 28-Jan-2001 29-Jan-2001 30-Jan-200 1 31 :Jan-200 1 TOTAL MAXIMUM AVERAGE #DAYS 0~1~2001 A34-14 INJ INJ ANN 1~7 3675 3625 1047 3675 3625 1033 3675 3625 1037 3675 3625 1043 3650 365C 1035 3650 365C 1033 3650 365¢ 970 3600 360( 1031 3650 365£ A41A-I ILN INJ INJ ANNU 778 3625 795 3625 787 3625 778 3625 795 3650 778 3650 786 3650 800 3600 787 3650 DISPOSAL WELL A44-11 INJ INJ ANNU 0 1000 20 0 1000 20 0 1~ 20 379 1150 20 0 850 40 362 1200 50 0 830 1907 1150 40 220 I100 AII-13R2 ACT ] INJ INJ ANNU 449 360O 438 3600 437 3600 435 3600 447 3650 436 3650 411 3650 370 3600 407 3650 AIl-12 INJ INJ ANNU 0 1300 1100 0 1300 1100 0 1300 1100 0 1300 1100 0 1100 1130 0 1050 1130 0 1050 1120 0 1100 11~ 0 1300 1~ A23-01R I INJ INJ ANNU 0 1325 1325 0 1325 1325 0 1325 1325 0 1325 1325 0 1350 135£ 0 1350 135£ 0 1350 135£ 0 1350 135( 0 1325 1325 A12-12 ACT INJ INJ ANNU 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1054 3650 365( 1050 3675 3675 1040 3675 3675 1034 3650 365( 1029 3675 3675 1034 3650 3650 1039 3650 3650 1036 3650 3650 1038 3675 3675 1028 3675 3675 1026 3650 3675 1039 3650 3675 1033 3650 3675 1039 3650 3675 1031 3650 3675 1026 3650 3650 1027 3650 3650 1025 3650 365C 1035 3650 365C 1032 3650 365E 1028 3650 365¢ 1025 3650 365C 32,004 3,675 3,675 1,032 3,656 3,653 794 3650 798 3625 785 3650 787 3650 789 3650 805 3650 809 3650 778 3650 804 3650 792 3650 778 3650 790 3650 777 3650 800 3650 787 3650 800 3650 799 3650 795 3650 776 3650 776 3650 776 3650 774 3650 24,453 3,650 789 3,644 345 1100 40 0 650 45 310 1100 6( 0 650 45 0 600 6( 0 600 6( 0 600 7( 350 1200 65 0 675 6( 786 1000 7( 0 700 4( 384 1100 60 290 650 40 0 650 50 402 1150 60 0 600 60 0 60O 60 0 600 60 0 600 60 790 1200 60 0 600 60 0 600 60 6,525 1,200 70 210 855 49 i12 426 3650 433 3700 435 3600 427 3600 426 3600 423 3600 425 3600 427 3600 415 3600 422 3600 420 3600 409 3600 415 3600 423 3600 425 3600 439 3600 445 3600 447 3600 455 3600 460 3600 458 3600 461 3600 13,346 3,700 431 3,611 1300 15~ 900 15¢ 900 175 900 175 875 175 850 175 850 1175 850 120( 900 1175 875 1200' 950 1175 925 1200 925 1175 875 2000 850 2000 850 1200 850 1200 850 1200 850 1200 850 1200 850 1200 850 1200 0 1,300 2,000 0 983 1,212 0 1325 1325 0 1350 1350 0 1325 1325 0 1350 1350 0 1325 1325 0 1325 1325 0 1325 1325 0 1325 1325 0 1300 1325 0 1325 1325 0 1300 1300 0 1325 1325 0 1325 1325 0 1300 130(3 0 1300 130~ 0 1300 130(3 0 1300 130~ 0 1300 130(2 0 1300 1275 0 1300 1275 0 1300 1275 0 1300 130( 0 1,350 1,350 0 1,321 1,319 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 ~NCf INJ ANNU 780 3650 0 795 3650 0 778 3650 0 787 3650 0 788 3650 0 788 3650 768 3650 682 3600 768 3650 807 3650 794 3650 780 3650 768 3650 764 3650 765 3650 772 3650 770 3650 766 3650 0! 759 3650 0 759 3650 0 769 3650 0 765 3650 765 3650 764 3650 750 3650 752 3650 750 3650 764 3650 761 3650 755 3650 748 3650 23,781 3,650 767 3,648 A23-01R and A 11-12 shut in to lower the pressure while we are doing a sidetrack on A 14-01 and A24-01. A44-02 ACT INJ I ~ I^~ 742 3650 1000 3650 495 3650 735 3650 740 3650 753 3650 741 3650 697 3600 744 3650 766 3650 764 3650 753 3650 742 3650 739 3650 737 3650 737 3650 735 3650 728 3650 729 3650 738 3650 711 3650 714 3650 734 3650 722 3650 711 3650 721 3650 708 3650 0 716 3650 0 734 3650 0 725 3650 0 733 3650 22,744 0 3,650 0 734 3,648 31 December-2000 A34-14 A41A-I 1LN INJ INJ ANNU WATER INJECTION REPORT PLATFORM A DISPOSAL WELL I A44-11 I All-13R2 I Ali-12 01-Dec-2000 02~Dec-2000 03-Dec-2000 04-Dec-2000 05-Dec-2000 06~Dec-2000 07-Dec-2000 08-Dec-2000 09-Dec-2000 10-Dec-2000 11-Dec-2000 12-Dec-2000 13-Dec-2000 14-Dec-2000 15-Dec-2000 16-Dec-2000 17-Dec-2000 18-Dec-2000 19-Dec-2000 20-Dec-2000 21-Dec-2000 22-Dec-2000 23-Dec-2000 24-Dec-2000 25-Dec-2000 26-Dec-2000 27-Dec-2000 28-Dec-2000 29-Dec-2000 30~Dec-2000 31 -Dec-2000 1066 3650 3650 1055 3650 3650 1073 3650 3650 1062 3650 3650 1059 3650 3650 1059 3650 3650 1009 3650 3625 1041 3625 3625 1047 3650 365C 1047 3600 360( 1046 3650 365£ 1024 3650 365( 1052 3650 3650 I045 3650 3650 1028 3650 3650 1041 3650 3650 1042 3650 3650 1026 3650 3650 995 3650 3650 1042 3675 3675 1079 3675 3675 1051 3675 3675 1049 3650 365C 1051 3650 365£ 1043 3650 365C 1051 3650 365( 1042 3675 3675 1051 3675 367~ 1033 3675 3625 1031 3675 3625 1052 3675 3625 TOTAL MAXIMUM AVERAGE # DAYS 01/12/2001 32,392 3,675 3,675 1,045 3,654 3.648 833 3625 841 3625 816 3625 863 3625 835 3625 889 3625 838 3625 857 3600 890 3625 854 3600 878 3600 852 3625 886 3625 769 3625 797 3600 785 3625 768 3600 781 3625 763 3625 820 3625 840 3625 810 3625 794 3625 813 3625 811 3625 815 3625 820 3625 788 3625 790 3625 815 3625 801 3625 25,512 3,625 823 3,621 528 1800 40 414 3600 0 650 20 415 3600 0 500 50 430 3600 0 350 60 432 3600 0 350 60 435 3600 714 1650 70 433 3600 0 700 440 3600 0 300 454 3625 0 200 458 3650 0 150 65 451 3600 448 1800 65 444 3600 820 1650 C 423 3650 0 300 4C 430 3650 0 200 5£ 432 3650 0 100 65i 420 3625 0 100 70 426 3600 848 1600 80 434 3600 0 250 40 425 3600 402 1500 60 396 3600 402 1600 20 427 3600 0 400 30 366 3600 0 100 60 368 3600 379 1600 60 381 3600 345 1800 70 387 3600 0 800 20 393 3600 379 1800 20 413 3600 0 1000 2C 427 3600 392 1800 2C 443 3600 384 1800 2C 446 3600 371 1850 2£ 459 3600 0 1000 2C 468 3600 13,170 8C 3,650 41 425 3,608 31 6,412 1,850 207 958 0 2450 750 0 2450 75£ 0 2400 75C 0 2400 75£ 0 2400 75C 0 2400 75C 0 2400 73( 0 2375 75( 0 2375 750 0 2350 750 01 0 2350 750 0 0 2350 750 0 0 2350 750 0 2300 750 0 2300 775 0 2350 760 0 2350 775 0 1400 1450 0 2400 1400' 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 1400 0 1400 14012 0 1400 140G 0 1400 140C 0 1375 1375 0 1375 1375 0 1375 1375 0 1400 140( 0 1375 1375 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 845 3650 0~ 835 3600 840 3650 01 817 3650 845 3650 0 848 3650 823 3650 812 3650 820 3650 778 3650 819 3650 799 3625 738 3650 723 3625 797 3650 0 729 3600 796 3650 0 745 3625 800 3600 745 3600 788 3600 747 3600 775 3650 731 3650 791 3650 788 3650 775 3650 787 3650 789 3625 0 2350 775 0 2325 775 0 1275 1025 0 2325 8ff 0 2325 77.~ 0 2300 800 0 2300 800' 0 900 900 0 2050 1025 0 0 1275 1025 0 0 1275 1025 0 0 1275 1025 0 0 1300 11013 0 0 1300 1100 0 0 2,450 1,100 0 0 2,094 830 0 0 1375 1375 0 1375 1375 0 1350 1350 0 1375 1375 0 1375 1375 0 1375 1375 0 1375 1375 0 1375 1375 0 1375 1375 0 1350 1350 0 1350 1350 0 1350 1350 0 1350 135£ 0 1325 1325 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 760 3625 738 3625 802 3650 859 3650 826 3650 826 3650 821 3650 810 3650 812 3650 802 3650 816 3650 782 3650 781 3650 800 3650 0 2,400 1,450 0 1,412 t,381 0 0 0 0 24,851 3,650 0 802 3,644 756 3650 742 3650 752 3625 742 3625 756 3650 737 3650 707 3650 750 3650 791 3650 0 788 3650 0 789 3650 768 3650 780 3650 747 3650 750 3650 772 3650 737 3650 756 3650 765 3650 23,694 3,650 0 764 3,640 ~23-01R and Al 1-12 shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A ~' ' 01 .No',;. ?000 02- Nov 03.-Nov..20C,0 05- No',;. 2000 06-Nov-2000 07..Nov..2000 09- N or. 2-:)00 1 O-Nov-Z000 1 12-Nov-20C,) 15.Nov. 2000 14-Nov-2000 t 5-.Nov.-20CO 16-Nov-2000 17.Nov. 20-:'X) I g-Nov-2000 19--Nov..20C, O 2(l-Nov-20;.,~) 21 .Nov.2000 22-Nov-2000 23--Nov..20CO 24- Nov-2(.~nly0 25.. Nov. 2000 26-Nov-2000 27 ..NO~-20(..v,) 2g-Nov-2000 29-Nov- 20(X) 30-Nov'-2000 TOTAL MAXIMUM AVERAGE # DAYS I A34-14 I A41A-I ILN I ACT ACT INJ INJ ANNUI INJ [NJ ANNU 1107 3650 365£ 1091 3650 365C 1087 3650 365C 1091 3650 365C 1079 3650 365C 793 3650 365C 358 2350 235~ 1211 3650 365G 1143 3625 3625 1083 3650 3625 1084 3625 3625 1066 3650 3650 1076 3625 3625 1037 3625 3625 1055 3625 3625 1039 3625 3650 1036 3625 3625 1035 3625 3625 1036 3625 3625 1039 3625 3625 1023 3625 3625 1024 3625 3625 1087 3650 3625 1078 3650 3650 1069 3650 3650 1076 3650 3650 1079 3650 3650 1073 3650 3650 1078 3650 3637.5 1110 3650 3650 31,243 3,650 3,650 1,041 3,597 3,595 929 3625 904 3625 902 3625 835 3625 878 3625 662 3625 237 1400 931 3600 956 3600 897 3625 964 3600 954 3600 953 3600 935 3625 966 3600 929 3600 944 3600 947 3600 941 3600 893 3600 924 3600 920 3600 904 3600 873 3625 909 3625 930 3625 901 3625 854 3625 867 3612.5 881 3625 26,520 3,625 0 884 3,539 0 DISPOSAL WELL A44-11 ACT ] [NJ l'NJ ANNU A11-13R2 ACT ] [NJ [NJ ANNU 541 3600 568 3600 557 3600 549 3600 530 3600 387 3600 108 1100 420 3625 453 3600 315 3600 344 3650 340 3650 355 3625 349 3625 338 3600 336 3600 355 3600 360 3600 374 3600 362 3600 362 3600 367 3600 401 3650 413 3650 391 3650 409 3650 379 3650 384 3650 397 3600 544 3600 All-12 ACT [ . [NJ INJ ANNU 594 3675 150 591 3675 150 587 3675 150 592 3675 15( 585 3675 15( 428 3675 15( 0 2800 15C 0 2800 15C 0 2700 55£ 0 2675 575 0 2650 60( O' 2650 625 0 2600 63£ 0 2600 65C 0 2600 65C 0 2600 65C 0 2600 675 0 2550 70( 0 2550 70C 0 2550 70C 0 2525 70C 0 2525 70C 0 2500 725 0 2475 725 0 2475 725 0 2475 725 0 2500 725 0 2500 725 0 2475 737.5 599 3675 150 A23-01R ACT I [NJ INJ ANNU 0 1500 150C 0 1500 150C 0 1500 150G 0 1500 150C 0 1500 1475 0 1475 1475 0 1475 1475 0 1475 14'75 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1450 1450 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1425 1425 0 1412.5 1412.5 0 1500 1500 0 50 5G 0 50 5~ 0 50 50 0 50 50 0 50 50 0 50 50 0 50 50 0 5O 50 381 1600 50 0 50 45 850 1700 10 0 125 10 0 50 60 507 1500 70 0 180 60 500 1750 60 402 1500 60 0 100 60 501 1500 60 0 100 40 426 1500 60 1820 1500 20 1200 1700 20 0 130 20 0 125 50 477 1500 50 607 1700 5( 0 100 2( 500 1600 4~ 924 1600 9C 9,095 1,750 90 303 734 47 11,988 3,650 400 3,533 3,976 3,675 738 133 2,837 518 0 1,500 1,500 0 1,452 1,451 A12-12 · [NJ [NJ ANNU 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o A33-14 INJ [NJ ANNU 913 3650 0 903 3650 0 891 3650 0 901 3650 0 881 3650 0 644 3650 0 281 3000 0 1044 3650 0 947 3600 0 897 3650 0 884 3650 0 861 3650 0 865 3650 0 819 3650 0 835 3650 0 822 3600 811 3600 806 3600 804 3600 0 810 3600 0 792 3600 0 787 3600 0 888 3650 0 878 3650 0 857 3650 0 863 3650 0 866 3650 0 855 3650 0 869 3650 0 926 3650 0 25,200 3,650 0 840 3,615 o 12/11/2000 A23-01R and A 11-12 shut in to lower the pressure while we are doing a sidetrack on A 14-01 and A24-01. WATER INJECTION REPORT PLATFORM A ....... DISPOS'M. WELL"' Oc I,,')i'~er. 20£K) A34-14 A41A-I ILN A44-11 A1 I-13R2 Al 1-12 A23-01R A12-12 A33-14 . · :':-:.:.:.:.:,:.:.:.:.:-:.:.:-:-:':.:.:.:.:.:.:.:.:-: ACT ACT ACT ACT ACT ACT ACT ACT . Ot .-Oct- 300-'.',' 1103 3600 360(; 1002 3575 0 0 50 100 426 3600 C 528 3600 25C 0 1550 1550 0 0 0 924 3600 16 2-0c~-200~. 1107 3600 3600 1001 35750 0 50 100 434 - 3600 C 533 3625 250 0 1550 155(] 0 0 0 930 3600 16 03-0c~..20('-'0 1097 3600 3601 996 3575 0 0 50' 100 436 3600 0 530 3625 25C 0 1550 155C 0 0 0 915 3600 17 04-Oc1.0 :'~ :',' '.' 1155 3600 360(1 1015 3600 O= 0 50 1 O0 463 3500~ 572 3650 245 0 1550 155(1 0 0 0 1 O01 3600 17 05 Oc. '.::';00 1129 3600 3625 975 3600 Ol 0 50 100 457 3500 563 3650 24(2 0 1550 155(] 0 0 0 971 3600 17 o6..0c~-2000 1109 3600 362~ 985 3600 0 0 50 10(1 472 3500 Oi 555 3650 25C 0 1550 152~ 0 0 0 948 3600 0 ',',':;:- 0c.',-.2000 1141 3600 362~ 1013 3600 0 0 50 10(1 522 3500 0i 594 3650 25¢ 0 1550 150(: 0 0 0 1019 3600 0 05-'0c~-.2;:,~)6 1148 3600 362,,. 982 3600 0 0 50 10(~ 515 3500 0 600 3650 25C 0 1550 150(; 0 0 0 1019 3600 0 09..0,,~.'.. 2 .;~'~-','~ 1149 3600 362~ 95.1 3600 0 0 50 10C 520 3500 0 603 3650 25£ 0 1550 150(; 0 0 0 1015 3600 0 i 0-0o:-20-,30 1147 3600 362~ 946 3600 0 0 50 10(1 526 3500 0 603 3650 25£ 0 1550 150(; 0 0 0 1006 3600 0 I ! .0c.~..2000 1133 3600 362,~ 928 3600 0 0 50 10C 519 3500 0 597 3650 200 0 1550 1500 0 0 0 992 3600 0 i ..'. -0c;-20c,,') 1140 3600 360C 922 3600 0 0 50 10C 521 3600 0 601 3600 175; 0 1500 1500 0 0 0 990 3600 0 13 .Oct. ?. o0.',~ 1127 3600 3600 931 3625 0 0 80 10(; 515 3600 0 593 3650 190 0 1500 1500 0 0 0 971 3650 0 i 4..0c~20-a0 1133 3650 3650 981 3625 0 0 50 10{; 517 3625 0 597 3650 180 0 1500 1500 0 0 0 976 3625 0 ! 5.0c'.-2c00 1119 3650 3650 971 3625 0 0 50 10(; 491 3625 0 589 3650 200 0 1500 1500 0 0 0 957 3625 0 i 0-0c;-2000 1129 3650 3650 984 3625 0 0 50 100 502 3625 0 596 3650 200 0 1500 1500 0 0 0 967 3650 i ','..Oct. 2 .'.'~ 0-:'~ 1122 3650 3650 981 3625 0 0 50 10£ 499 3625 0 594 3650 190 0 1500 t 500 0 0 0 958 3650 ~ ~:-oct-2000 1132 3650 3650 980 3625 0 0 50 10[ 494 3625 0 595 3650 190 0 1500 1500 0 0 0 955 3650 u 19.0c,,..2000 1109 3650 3625 961 3650 0 0 50 100 508 3625 0 591 3650 200 0 1500 1500 0 0 C 948 3650 0 20-0c~.-2C,0C, 1120 3650 3625 947 3625 0 0 50 100 503 3625 0 595 3650 200 0 1500 1500 0 0 (1 950 3650 0 21..Oct..2000 1112 3650 3625 913 3625 0 0 50 100 512 3625 0 591 3650 200 0 1500 1500 0 0 C 939 3650 0 22-0c~-2000 1116 3650 3625 885 3625 0 0 50 1 O0 523 3625 0 597 3650 175 0 1500 1500 o 0 .c 949 3650 0 23-0ct..2000 1105 3650 3625 945 3625 0 0 50 100 519 3600 0 588 3650 175 0 1500 1500 0 0 ¢ 927 3650 0 24-0c~- 2,':,00 1096 3650 3650 950 3600 0 0 50 1 O0 514 3600 0 583 3650 175 0 1500 1500 0 0 C 916 3650 0 25-.()ct. :.?.o(ff~ 1103 3650 3650 936 3625 0 0 50 100 500 3600 0 590 3650 150 0 1500 1500 0 0 0 922 3650 0 26-0c~-2000 1097 3650 3650 959 3625 0 0 50 100 497 3600 0 585 3650 175 0 1500 1500 0 00 914 3650 0 27.0ct..2000 1104 3650 3650 925 3625 0 223 1475 100 519 3600 0 591 3675 150 0 1500 1500 0 0 0 921 3650 0 .2~-0c~..2oc,0 1106 3650 3650 940 3650 0 0 50 70 520 3600 0 593 3675 150 0 1500 1500 0 0 0 919 3700 0 29..0ct. 2000 1142 3650 3650 965 3650 (1 0 50 80 530 3600 (1 615 3675 150 0 1500 150(] 0 0 0 951 3650 0 30-0ct-2000 1110 3650 3650 881 3625 (1 0 50 90 544 3600 (1 599 3675 150 0 1500 150(1 0 0 0 926 3650 0 .3 l..Oc',..2,'X~O 1080 3650 3650 918 3625 (1 0 50 90 532 3600 O 588 3675 150 0 1500 1500 0 0 0 897 3650 0 TOTAL 34,720 29,669 223 15,550 18,149 0 0 29,593 MAXIMUM 3,650 3,650 3,650 0 1,475 100 3,625 0 3,675 250 1,550 1,550 0 0 3,700 17 AVERAGE 1,120 3,629 3,631 957 3,615 0 7 97 98 502 3,581 0 585 3,649 200 0 1,518 1,509 0 0 0 955 3,631 3 # DAYS 31 31 I 31 31 0 0 31 I 1/14/2000 a.23-01R shut in to lower the pressure while we are doing a sidetrack on Al4-01 and A2.4-01. WATER INJECTION REPORT PLATFORM A DISPOSAL WELL .,',~g.'..~.~.v.~ 00!~ A34-14 A41A-I ILN A44-11 Al 1-13R2 Al 1-12 A23-01R Al2-12 A33-14 :i:iiiiiii:i:iiii!iii~iiiiii:i:~:~ili}:i:!':! ACT ACT ACT ACT ACT ACT ACT ACT :::::::::::::::::::::::::::::::::::::::::::: ii !DA..'tEi&!N0.?tE~ !iiii i i ii iii iiiii il INJ [NJ ANNU [NJ INJ ANNU [NJ [NJ ANNU [NJ [NJ ANNU [NJ INJ ANNU INJ INJ ANNU INJ INJ ANNU [NJ [NJ ANNU ::::::::::::::::::::::::::::::::::::::::::: .... -'.') i ..Aug. 200,.'.~ 1128 3400 340C 1035 3650 (3 0 75 116 555 3650 0 510 3650 500 0 1700 1700 0 0 C 1115 3100 C (.'.2 · A ug..200(.'. I 157 3450 345C 1037 3650 (3 0 75 I 16 552 3650 0 507 3650 45(: 0 1700 1700 0 0 C 1141 3150 03.- '¥,~,'..,-2000 1146 3450 345C 1045 3600 (3 0 75 115 560 3650 0 513 3650 450 0 1725 1725 0 0 C I I 13 3175 C (~4-Aag-200(: 1176 3475 34751061 3625 (30 75 115 571 3650 0 518 3650 45C 0 1750 1700 0 0 C 1152 3175 C 05. Aug..2000 1205 3500 350C 1035 3600 0 0 75 115 559 3650 0 506 3650 45C 0 1700 1700 0 0 C 1197 3250 C 06../\ u.g 2000 1197 3500 350C 1044 3625 ~3 0 75 115 564 3650 0 509 3650 425 0 1700 1700 0 0 0 1181 3275 0 · ';;'-/,,uo-20. ,.., .... '~0 1165 3500 350C 1035 3600 0 0 75 117 558 3650 0 502 3650 4251 0 1750 1700 0 00 1137 3300 0 C,-8-Au,',,...200C~ 1172 3500 350C 1041 3625 (3 0 75 119 562 3550 0 506 3650 450 0 1700 1700 0 0 0 1160 3325 0 ..'~9.. .... ,~ uo-~000:.~,. 1183 3500 3525 1047 3600, ~3 0 75 I 19 566 3550 0 508 3650 425 0 1700 1700 0 0' 0i 1256 3350 0 } -',). Aug..200(,'. 1254 3575 355C 1040 3600 (3 816 1750 119 564 3550 0 508 3650 400 0 1700 1700 0 0 0 1328 3400 0 I i ..A~tg-2000 1312 3600 360( 1053 3600 (3 0 75 120 571 3550 0 515 3650 400 0 1700 1700 0 0 0: 1348 3450 0 i 2-Aug-2()0(~ 1286 3625 360(:1030 3600 C 0 75 120 558 3550 0 502 3650 400 0 1700 1700 0 0 0 1324 3450 0 13..Aue--2 '~00 ,, 1291 3650 365C 1037 3600 (3 0 75 120 562 3550 0 507 3650 400 0 1700 1700 0 0 0 1429 3475 0 ,~.-At .:,.. 2000 1273 3650 365(: 1043 3600 f~ 0 75 120 570 3550 0 510 3650 400 0 1700 1700 0 0 0 1488 3525 0 15-Aug-2000 ,661 3650 365f 591 3600 (3 0 75 120 278 3550 0 152 3650 400 0 1700 1700 0 0 0 735 3525 16-Aug-2000 .1242 3450 345(: 865 3600 (3 0 75 120 357 3550 0 322 3650 500 0 1650 1650 0 0 0 1159 3500 t 7.-Aug.2000 2169 3450 34951045 3450 (3 0 50 119 443 3400 0 412 3510 400 0 1680 1650 0 0 0 1316 3500 l ~ ..Aug..200(,'. 667 3475 350£ 1013 3450 (3 0 50 120 447 3400 0 407 3525 400 0 1650 1650 0 0 0 1085 3500 0 19-.,\ug-2000 1362 3450 349£ 1004 3450 £ 0 50 120 458 3400 0 409 3510 440 0 1650 1650 0 0 0 1078 3450 0 20-Aug-200(I 1362 3450 350(: 1006 3450 C 0 50 120 457 3400 0 413 3515 425 0 1650 1650 0 0 0 1129 3450 0 ': ~, .Aug..2000 1343 3450 3500 1003 3450 C 0 50 120 458 3400 0 416 3510 415 0 1650 165(3 0 0 0 1165 3450 0 22.-A~o~. 2000 1331 3450 350£991 3450 ¢ 0 50 119 458 3400 0 416 3510 440 0 1650 1650 0 0 0 1129 3500 0 23-Aug..2000 1356 3450 350C1018 3450 (3 0 50 120 468 3400 0 427 3505 450 0 1650 1650 0 0 0 1136 3500 0 2-';-Aug-2000 1433 3600 3575 1047 3550 C 0 50 120 537 3500 0 505 3600 400 0 1'650 1650 0 0 0 1320 3600 0 25..Aug.200() 1496 3650 360(: 1087 3600 G 0 50 118 601 3550 0 572 3650 350 0 1600 1600 0 0 0 1406 3600 0 2(;-.Aug..2000 1474 3650 36001166 3600 (: 0 50 118 608 3550 0 578 3650 375 0 1600 160~ 0 0 0 1366 3600 0 27-q ..e-20r)~ 1459 3650 360(: 993 3600 (3 0 50 118 606 3550 0 574 3650 350 0 1600 1600 0 0 0 1329 3600 0 2bNAug-200(~ 1452 3650 3600 1077 3600 C 0 50 i 16605 3550 0 575 3650 350 0 1600 160(3 0 0 0 1297 3600 0 29-.Aug..2000 1413 3650 36001 ! 135 3600 C 0 50 116 584 3550 0 562 3650 350 0 1600 160(3 0 0 0 1256 3600 0 30..Aug. 2000 1429 3650 360(: 983 3600 (3 0 50 115 588 3550 0 568 3650 350 0 1600 160(3 0 0 0 1248 3600 0 3 l-Aunt-200.0 1404 3625 3700 1052 3600 (: 0 50 115 587 3700 0560 3650 390 0 1700 165(~ 0 0 0 1215 3600 0 TOTAL 39,998 31,659 816 16,412 14,989 0 0 37,738 MAXIMUM 3,650 3,700 · 3,650 0 1,750 ' 120 3,700 0 3,650 500 1,750 1,725 0 0 3,600 0 AVERAGE 1,290 3,541 3,542 1,021 3,570 0 26 117 118 529 3,542 0 484 3,617 413 0 1,671 1,665 0 0 0 1,217 3,438 0 # DAYS 31 31 I 31 31 0 0 31 09/18/2000 &23-01R shut in to lower thc pressure while we are doing a sidetrack on Al4-01 and A24-01. WATER INJECTION REPORT PLATFORM A ' DISPOSAL WELL ' ' ........ J uiy-2(~(~C, A34-14 A41A-I ILN A44-11 Al I-13R2 A11-12 A23-01R A12-12 A33-14 G1..Jul.2000 0 940 100C 9'76 3600 0 0 75 102 484 3600 0 207 3650 800 0 1900 1900 0 0 0] 0 0 0i 02-.J uI..2000 0 940 975 988 3600 0 0 75 103 470 3600 0 441 3650 850 0 1900 1900; 0 00l 0 0 0l 03-Jul-2000 0 940 975 974 3600 0 0 75 103 481 3600 0 445 3650 850 0 1900 1900 0 0 0 0 0 0 04-Jul-2004~ 0 940 975 996 3600 0 0 75 103 497 3600 0 ~55 3650 850 0 1900 1900 0 0 0l 0 0 0 05-..tui.-2000 0 920 975 960 3600 0 0 75 104 491 3600 0 441 3650 850 0 1900 1900 0 0 0 0 0 0 06..Jul. 2.000 0 930 975, 988 3600 0 0 75 104 510 3600 0 454 3650 875 0 1875 1875 0 0 0 0 0 0 (;'7-J ul-2000 0 920 950 983 3600 0 0 75 125 506 3600 0 454 3650 875 0 1875 1875 0 0 0 0 0 0 08-Jv.l-2000 0 920 950 976 3600 0 0 75 125 501 3600 0 448 3650 875 0 1875 1875 0 0 0 0 0 0 09.-Ju1.2000 0 950 920 982 3625 0 0 75 125 501 3600 0 450 3650 875 0 1850 1850 0 0 0 0 0 0 10...I ttl..20(K,'. 0 950 920 977 3600 0 0 75 135 495 3600 0 448 3650 875 0 1850 1850 0 0 0 0 0 0 ! I-.lul-2000 0 950 920 978 3625 I~ 0 75 135 480 3600 0 445 3650 900 0 1850 1850 0 0 0 0 0 0 12-Jvl-2000 0 910 950 986 3600 0 0 75 10~ 478 3600 0 451 3650 900 0 1825 1825 0 0 0 0 0 0 ~ 3.,Jul..2000 0 910 950 976 3600 13 0 75 105 478 3600 0 451 3650 900 0 1825 1800 0 0 0 0 0 0 hl..Jul. 200(~ 0 910 950 979 3600 ~ 0 75 i0~ 475 3600 0 456 3650 900 0 1825 1775 0 0 0 0 0 0 i5-Jul-2000 0 910 950 975 3600 0 0 75 I0~ 477 3600 0 454 3650 900 0 1825 1750 0 0 0 0 0 16-.hfi-2000 0 910 950 978 3600 13 0 75 10S 492 3600 0 ,j56 3650 950 0 1825 1750 0 0 0 0 0 ! 7.-Jul.2000 0 900 950 918 3600 G 0 75 10~ 415 3600 0 388 3650 950 0 1800 1800 0 0 0 0 0 i 8.d u1.-200() 0 900 950 826 3600 C 0 75 109 348 3600 0 355 3650 9513 0 1800 1800 0 0 0 0 0 19-Jt.-'1-2000 34 1950 2000 909 3650 13 0 75 111 400 3600 0 415 3675 825 0 1800 1800 0 0 0 0 0 0 20-J ul-20(.~i) 244 1950 2000 1087 3650 C 0 75 fll 491 3600 13531 3675 825 0 1800 18013 0 0 13 0 0 2 t ..J ul..2000 307 2650 2650 1070 3650 ~ 0 70 112 520 3650 0 533 3650 7712 0 1750 17713 0 0 0 0 0 C 22.Jt;1.2000 469 2875 2875 1067 3650 ( 0 70 112 534 3650 13533 3650 73(2 0 1750 1775 0 0 13 0 0 C 23-Jui-.2000 478 2900 2925 1045 3650 12 0 70 112 535 3650 (l521 3650 725 0 1750 175C 0 0 13 0 0 C 24- v:l-230{) 491 2950 2950 1057 3650 £ 0 60 114 548 3650 12 528 3650 725 0 1750 17512 0 0 C 0 0 12 25..Jut.2000 482 2950 2950 1045 3650 ( 0 60 114 549 3650 13 520 3650 750 0 1750 17512 0 0 C 0 0 C 26...t ut..2000 631 3000 3000 1054 3650 0 0 60 115 557 3650 12 525 3650 70( 0 1750 17512 0 0 12 0 0 27-.1ul.2000 794 3100 3150 1053 3650 01 0 75 118 564 3650 12 531 3650 70( 0 1750 17512 0 0 22 2000 28-Jc.1-2000 924 3250 3250 1058 3650 0 0 75 118 575 3650 12535 3650 650 0 1750 1750: 0 0 0 431 2600 0 2~- -. vi.2 '~00 929 3300 3300 1036 3650 0 0 75 119 552 3650 12510 3650 600 0 1700 170( 0 0 0 777 2800 0 30..Jui-'..O00 1033 3350 3350 1049 3650 O, 0 75 117 557 3650 12 513 3650 550 0 1700 170( 0 0 Oi 979 2900 0 31 -J c'.1-2000 1079 3400 33513 1044 3650 0 0 75 117 555 3650 ( 511 3650 525 0 1700 1700 0 0 0 1040 3000 0 ..... TOTAL 7,895 30,990 0 15,516 14,405 0 0 3,249 MAXIMUM 3,400 3,350 3,650 0 75 135 3,650 03,675 950 1,900 1,900 0 0 3,000 0 AVERAGE 255 1,751 1,772 1,000 3,623 0 0 73 113 501 3,618 01 465 3,652 806 0 1,810 1,804 0 0 0 105 429 0 # DAYS 13 31 0' 31 31 0 0 5 08/08/2000 33-14 down due to annular communication problem. Form 10-403 submitted to AOGCC on 11/19/1999. Began injection on 7/27/00 after successful rig job. Form 10404 to be submitted within 10 days. 34-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on 11/19/I 999. Began injection on 7/19/00 after repair orA33-14. Form 10-404 to be submitted within 10 days. 23-01R shut in to lower the pressure on A33-14 per Production Superintendent Doug Marshall. ,., WATER INJECTION REPORT PLATFORM A DISPOSAL WELL June-2000 A34-14 A41A-1 ILN A44:11 Al 1-13R2 A11-12 A23-01R A12-12 A3'3-14 i ii~i~i~ ililii ii i i iiii ilili i INJ INJ ANNU INJ INJ ANNU INJ 1NJ ANNU INJ INJ ANNU INJ INJ ANNU INJ INJ ANNU INJ rNj ANNU INJ INJ ANNrU 01.-J un.2000 0 1000 1050 1055 3600 30 0 75 89 491 3600 0 489 3600 350 1075 3600 3600 0 0 0 0 1760 1760 02-Jun..2000 0 1000 1050 1051 3600 45 0 75 89 486 3600 0 486 3600 350 1069 3600 360( 0 0 0 0 1760 1760 03-Jtm-2000 0 1000 1050!':1058 3600 55 0 75 89 -490 3600 0 490 3600 350 1078 '3600. 3600 0 0 0 0 1760 1760 04-Jun-2000 0 1000 105121038 3600 80 0 75 89 484 3600 0 478 3600 375 1056 3600 3600 0 0 0 0 1760 1760 O$.-Jun..2000 0 1000 10512 1042 3600 130 0 75 92 487 3600 0 477 3600 400 1056 3600 3600 0 0 0 0 1760 1760 06..J'un. 2000 0 1000 10512 1045 3600 115 0 75 92 489 3600 0 482 3600 400 1066 3600 3600 0 0 0 0 1760 1760 07-Jun-2000 0 1000 100121028 3600 130 0 75 92 471 3600 0 473 3600 400 1041 3600 3600 0 0 0 0 1760 1760 08-Jun-2000 0 980 1025 1034 3600 160 0 70 92 462 3600 0 473 3675 400 1051 3700 3625 0 0 ' 00 1750 1750 09--Jun.2000 0 980 1025 1028 3600 185 0 70 92 452 3600 0 472 3675 400 1046 '3700 3625 0 0 0 ' 0 1750 175( 10.Jun..2000 0 980 1025 1041 3600 185 0 70 92 463 3600 0 479 3675 400 1060 3700 362~ 0 0 0 0 1750 175( I .l~Jun-2000 0 980 1000 1030 3600 200 0 - 70 92 451 3600 0 474 3650 42~ 1042 3700 3625i 0 0 00 1750 175( 12-Jun-200() 0 980 1000 1026 3600 225 0 70 941 440 3600 0 47 i 3650 4251040 3700 3625 0 ' 0 0 0 1750 175C 13.-Jun-2000 0 980 1000 1022 3600 230 0 75 9~ 433 3600 0 469 3650 42~ 1043 3700 3625 0 0 0 0 1750 175C 14-.J un. 2000 0 970 I000 1036 3600 235 0 75 95 444 3600 0 478 3650 425 1060 3700 3625 0 0 0 0 ! 750 175C 15-Jun-2000 0 970 1000 1034 3600 235 0 75 95 458 3600 f 481 3650 425 1058 3700 360C 0 0 0 0 1750 176C t6-Jun-2000 0 970 1000 1008 3600 23~ 0 75 95 459 3600 C 495 3650 40C 0 3700 270C 0 0 0 0 1750 17~J'un.2000 0 970 1000 1008 3600 235 0 75 95 452 3600 C 501 3650 60C 0 2500 250C 0 0 0 0 500 18.-Jun..2000 0 970 1000 1004 3600 23~ 0 75 95 454 3600 C 498 3650 58{2 0 2500 240C 0 0 0 0 400 375 19-Jun-2000 0 970 I000 995 3600 235 0 75 95 452 3600 C 493 3650 5812 0 2300 23012 0 0 0 0 350 3012 20-Jml-200() 0 970 1000 994 3600 235 0 75 95 457 3600 12 492 3650 6812 0 , 2300 22012 0 0 0 0 300 2812 21 .Jun-2000 0 970 1000 993 3600 235 0 75 95 466 3600 12 492 3650 6812 0 2300 22012 0 0 12 0 300 2812 22--Jun-2000 0 960 1000 · 985 3600 3612 0 70 97 471 3550 12 485 3650 755 0 2200 21512 0 0 12 0 280 2812 23~Jun-2000 0 940 1000 ' 991 3600 358 0 75 98 488 3550 12 489 3675 760 0 2100 2100 0 0 12 0 1600 1601 24-Jun-2000 0 960 1000 983 3600 356 0 75 98 496 3550 0 484 ~6,75 775 0 2100 2050 0 0 12 0 1660 1660 254un.2000 0 950 1000 981 3600 37'/ 0 75 99 500 3550 0 482 3675 775 0 2075 2050 0 0 12 0 405 400 26.Jun-2000 0 940 1000!984 3600 405 0 75 I00 509 3550 0 483 3650 790 0 2000 2005 0 0 12 0 68 100 2?-Jun-2000 0 940 ' 100( 972 3600 417 0 75 100 518 3550 0 478 3650 800 0 2000 2000 0 0 12 0 9 19 28-Jun-2000 0 940 100( 989 3600 435 0 75 102 536 3600 0 484 3650 800 0 2000 1975 0 0 12 0 1600 1600 29.Jun..2000 0 940 I00( 984 3600 415 0 75 102 544 3600 0 482 3650 800 0 1950 1950 0 0 12 0 1600 100 30-.J'un. 2000 0 940 100( 980 36® 415 0 75 102 548 3600 0 479 3650 800 0 1900 1900 0 0 C 0 100 160 TOTAL 0 30,419 0 14,351 14,489 15,841 0 0 MAXIMUM 1,000 1,050 3~600 435 75 102 3,600 0 3,675 800 3,700 3,625 0 0 1,760 1,760 AVERAGE 0 972 1,013 1,014 3,600 240 0 74 95 478 3,590 0 483 3,643 551 528 2,958 2,889 0 0 0 0 1,241 1,188 lq DAYS 0 30 0 30 30 15 0 0 ' 07/10/2000 A33-14 down due to annular communication problem. Form 10-403 submitted to AOGCC on 11/1911999. A34-14RDII down to ~educc pressure on A33-14. Form 10-403 submitted to AOGCC on 11/19/1999. A23-01R shut in to lo(vet the pressure on A33-14 per production Superintendent Doug Marshall. Aiasi<a Oit & Gas Cons. Commission WATE~R INJECTION REPORT PLATFORM A i.) I, M :.ry. 2000 02.,M ay..2000 :~3.M ay-2000 04-May.200o (JS-.M ay..2 ~6. M ~y. 2000 0 '2 ..M ay..2000 (6:-May-2000 09. M ay. 10..M ay..2000 I I -May.2000 I 13..M ay..2000 14. Mmy. 2000 1% M ay.-2 16-.May..2,)O0 I 7.M 18-.M ay-2000 19-May.2000 20-May.2000 21 --May..2000 22.May.2000 23 .M 24.May-2000 25.May.2000 26..Mnp.2000 27.May.2000 2g.May-20(,o 29..Mny..2000 30. May. 2000 31 -M 0%2000 TOTAL MAXIMUM AVERAGE #DAYS 06/14/2000 A34-14 0 I100 il30 0 1050 llOO 0 1050 II00 0 1060 II00 0 1040 1100 0 1040 IlO0 0 I060 I100 0 IO60 1100 0 1060 1100 0 1050 i1~ 0 1050 I100 0 1050 IIO0 0 1050 I100 0 1050 i100 0 1050 I100 0 1050 I100 0 1030 1075 0 1050 105( 0 1050 105( 0 1050 105( 0 I~0 105( 0 1050 105( 0 1050 105( 0 1050 105( 0 1010 105( 0 I010 105( 0 1000 105( 0 1000 1 ~( 0 I000 104( 0 lO00 I~( 0 1000 1~( 0 I,i00 1,130 0 1,041 ' 1,077 0 A41A-IILN 984 3575 9C 993 3600 105 1004 3600 25 989 3600 4C 974 3600 4C 93~ 3600 155 982 3550 95 984 3550 85 1005 3600 95 982 3575 55 1000 3575 55 996 3575 105 992 3575 120 993 3575 125 I000 3575 100 .987 3575 100 1000 3575 150 994 3575 150 994 3575 150 1003 3575 150 1008 3575 150 994 3575 150 1000 3575. 150 1005 3575 150 I001 3600 250 968 3600 280 1036 3600 25 1037 3600 45 1035 3600 65 1044 3600. 35 I057 '3600' I0 30,978 3,600 280 999 3,584 106 31 DISPOSAL WELL A44-11 Al 1-13R2 0 70 80 0 70 79 0 50 ' 80 0 50 80 0 50 78 0 50 80 0 70 80 0 70 81 0 70 8 i 0 70 81 0 70 82 0 70 83 0 70 83 0 70 82 0 70 82 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 83 0 70 85 0 70 87' 0 70 87 0 70 88i 0 70 89 0 70 8~ 0 70 8~ 0 70 89 0 67 83 0 507 3600 520 3600 512 3600 510 3600 387 3600 422 3600 417 3600 438 3650 458 3600 459 3600 449 3600 448 3600 459 3600 469 3600 467 3600 471 3600 474 3600 472 3600 479 3600 482 3600 470 3600 475 3600 480 3600 476 360O 484 3600 491 3600 482 3600 476 3600 497 3600 499 3600 Al 1-12 A23-01R 424 3600 2601 1060 3600 357 :7, ',7, 428 3600 300 415 3600 300 388 3600 325 453 3600 300 461 36OO 300 481 3650 300 495 3625 275 496 3625 275 489 3625 3O0 482 3625 300 486 3625 300 489 3650 300 480 3650 300 483 3625 300 482 3625 300 478 3625 300 480 3625 300 480 3625 300 470 3625 300 473 3625 300 473 3625 300 469 3600 340 461 3600 340 456 3600 350 458 3600 35C 457 3600 36( 484 3600 36( 495 3600 35C 14,633 3,650 0 472 3,602 0 31 14,428 3~50 360 465 3,615 307 31 1066 3600 3600 1021 3600 3600 883 3600 3600 1009 3600 3600 1010 3600 3575 1058 3650 3550 1057 3650 3600 1068 3650 3600 1059 3700 3600 1055 3700 3600 1063 3675 3600 1063 3675 3600 1066 3675 3600 1065 3650 3600 1063 3650 3600 1058 3650 3600 1062 3650 3600 1065 3650 3600 1043 3650 360O 1052 3650 3600 1057 3650 3600 1047 3600 357~ 1035 3600 357~ 1024 36O0 3575 1034 3600 3575 1044 3600 357~ 1064 3600 1088 3600 32,493 3,700 1,048 3,631 31 AI2~12 0 o 0 0 0 o 0 0 0 0 0 · 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 0 1800 1820~ 0 1800 1810 0 1800 1810 0 1760 180C 0 1760 180( 0 1750 180~ 0 1750 180£ 0 1750 179C 0 0 1750 179£ 0 0 1750 178C 0[ 0 1750 1780 0 1750 178¢ 0 1750 1780 0 1750 1780 0 1750 1780 0 1750 178C 0 1750 0 1780 0 1780 1780 0 1780 1780 0 1780 1780 0 1780 1780 ~ 0 1780 1780 0 1780 1780 0 1750 1780 0 1750 1780 0 1750 1780 0 1730 1770 0 1730 1770 0 1730 1770 0 1730 1770 0 1,800 1,820 0 1,760 1,785 0 33-14 down due to annular communication problem. Form I0-403 submitted to AOGCC on ! 1/19/1999. 34-14RD11 down to reduce pressure on A33-14. Form 10-403 submitted to AOGCCon 11/19/1999. WATER INJECTION REPORT PLATFORM A DISPOS^L WEL~ "-~' April-2000 A34-14 ~, A4 IA-I ILN A44-1 I Al 1-13R2 Al 1-12 A23-01R AI2-12 A33-14 O[-Apr-2000 0 1170 120£ 1072 3575 I( 0 70 77 514 3600 0 400 3600 20C Il51 3600 3575 0 0 0 0 1800 180( 02-Apr-2000 0 1170 120£ 1017 3575 ~ 0 70 76 488 3600 0 379 3600 20C 1097 3600 3575 0 0 0 0 1800 184C 03-Apr-2000 0 Il70 120£ 1060 3575 I~ 0 70 78 505 3600 0 392 3600 200 Il41 3600 3575 0 0 0 0 lB10 184C 04-Apr-2000 0 Il60 120£ 1039 3575 23 0 70 76 494 3600 0 398 3600 21~ IlOI 3600 3575 0 0 0 0 1800 186C 05-Apr-2000 0 1160 ~20C 1088 3575 I$ 0 70 7~ 498 3600 0 494 3600 175 1143 3600 3575 0 0 0 0 1800.186£ 06-Apr-2000 0 1150 120C 1067 3600 2¢ 0 75 7~ 488 3600 0 488 3600 175 Il20 3600 3600 0 0 f 0 1825 184( 07-Apr-2000 0 1150 1200 1075 3600 2~ 0 75 75 500 3600 0 489 3600 200 1132 3600 3600 0 0 £ 0 1800 184£ 08-Apr-2000 0 1140 1200 1053 3600 20 0 75 78 490 3600 0 474 3600 200 lllO 3600 3600 0 0 C 0 1800 184C 09-Apr-2000 0 !140 1200 1058 3600 20 0 75 78 492 3600 0 472 3600 200 1114 3600 3600 0 0 ~ 0 1800 1840 lO-Apr-2000 0 Il40 1200 1051 3600 25 0 75 78 490 3600 t 465 3600 200 1102 3600 3600 0 0 C 0 1800 Il-Apr-2000 0 1140 1200 1050 3600 25 0 75 78 475 3600 £ 463 3600 200 1126 3600 3600 0 0 0 0 1800 1840 12-Apr-2000 0 i140 1200 1041 3600 25 0 75 78 463 3600 C 456 3600 20£ 1108 3600 360£ 0 0 0 0 1800 1840 13-Apr-2000 0 1165 Il70 1045 3600 40 0 70 79 460 3500 C 451 3640 2lC Il09 3700 360C 0 0 0 0 1800 14-Apr-2000 0 1160 1160 1045 3600 45 0 75 80 458 3500 G 450 3600 21C Il08 3600 359C 0 0 0 0 1800 15-Apr-2000 0 Il60 ll6C 1048 3600 55 0 75 81 467 3500 0 448 3600 225 Il13 3650 3600 0 0 0 0 1800 16-Apr~2000 0 i130 116C 1040 3600 3~ 0 75 77~ 487 3510 0 445 3650 225 1112 3600 3600 0 0 0 O 1775 182ff 17-Apr-2000 0 Il60 115C 1047 3600 33 0 75 75 500 3525 0 ~49 3650 21~ 1117 3600 3600 0 0 0 .0 1800 182ff 18-Apr-2000 0 1160 11SC 1043 3600 3C 0 75 7~ 494 3525 0 441 ~650 200 1103 3650 3600 0 0 0 '0 1800 181~ 19-Apr-2000 0 Il50 115G 1046 3600 35 0 75 7~ 469 3510 0 442 3600 225 1115 3600 360¢ 0 0 0 0 1800 181 20-Apr-2000 0 1150 115~ 1040 3600 35 0 75 7~ 453 3510 0 437 3600 225 1106 3600 3600 0 0 O[ 0 1800 181~ 21-Apr-2000 0 1150 1150 1033 3600 35 0 75 71 461 3510 0 439 3600 250 1103 3600 3600 0 0 C 0 1800 180 22-Apr-2000 0 1150 1150 1032 3600 35 0 75 77 46'3 3510 0 439 ~600 250 1104 3600 3600 0 0 C 0 1800 180~ 23-Apr-2000 0 Il50 1150 1025 3600 35 0 75 77 467 3510 0 437 3600 250 Il00 3600 3600 0 0 C 0 1800 180q 24-Apr-2000 0 1150 1150 1018 3600 35 0 75 77 481 3510 0 436 3600 250 1099 3600 3600 0 0 C 0 1800 185 25-Apr-2000 0 1150 1150 1006 3600 35 0 75 77 486 3510 0 432 3600 250 1087 3600 3600 0 0 .C 0 1800 185~ 26-Apr-2000 0 1150 1150 1004 3600 35 0 75 77 487 3510 C 431 3600 250 1082 3600 3600 0 0 g 0 1800 185 27-Apr-2000 0 II00 I130 1009 3575 60 0 70 77 497 3600 C 432 3600 250 1080 3600 3575 0 0 ~ 0 1800 182~ 28-Apr-2000 0 IlO0 1130 1002 3575 60 0 70 78 505 3600 C 431 3600 250 1076 3600 3575 0 0 G 0 1800 182~ 29-Apr-2000 0 IlO0 1130 1002 3575 85 0 70 79 500 3600 C 428 3600 250 1074 3600 357~ 0 0 0 0 1800 182q 30-Apr-2000 0 1 I00 1130 987 3575 90 0 70 79 496 3600 ~ 424 3600 2601 1060 3600 357: 0 0 0 0 1800 182 TOTAL 3 I, 143 0 14,528 13,262 33,193 0 0 0 MAXIMUM 1,170 1,200! 3,600 90 75 81 3,60~ 0 3,650 260 3,700 3,600 0 0 1,825 1,86 AVERAGE 0 1,146 1,169 1,038 3,593 35i 0 73 77 484 3,558 0 442 3,606 220 1,106 3,607 3,592 0 0 0 0 1,800 1,8 # DAYS 0 30 0 30 30 30 0 0 2~8 05/10/2000 ~ .... L33-14 down due to annular communication problem. Form 10-403 submitted to AOGCC on I 1/19/1999. ~34-14RDII down to reduce pressure on A33-14 Form 10-403 submitted to AOGCC on 11/19/1999 WATER INJECTION REPORT PLATFORM A March-2000 01 -Mar-2000 02-Mar-2000 03 -Mar-2000 04-Mar-2000 05-Mar-2000 06-Mar-2000 07-Mar-2000 08-Mar-2000 09-Mar-2000 10-Mar-2000 1 l-Mar-2000 12-Mar-2000 13 -Mar-2000 14-Mar-2000 15-Mar-2000 16-Mar-2000 17-Mar-2000 18-Mar-2000 19-Mar-2000 20-Mar-2000 21-Mar-2000 22-Mar~2000 23-Mar-2000 24-Mar-2000 25-Mar-2000 26-Mar-2000 27-Mar-2000 28-Mar-2000 29-Mar-2000 30-Mar-2000 3 l-Mar-2000 TOTAL MAXIMUM AVERAGE # DAYS 04/12/2000 A34-14 ACT INJ I'NJ ANNU 0 1350 126¢ 0 1260 130¢ 0 1270 130C 0 1260 130C 0 1260 130C 0 1260 130~ 0 1240 1280 0 1240 1270 0 1240 1300 0 1240 1275 0 1240 1300 0 1230 1275 0 1220 1275 0 1210 1275 0 1210 1250 0 1210 1275 0 1210 1250 0 1200 1250 0 1200 1250 0 1200 1250 0 1200 1250 DISPOSAL WELL A41A~I ILN A44-11. 1119 3550 1097 3575 1007 3575 1517 3575 543 3575 1146 3575 1133 3575 1135 3575 1102 3575 i114 3600 1109 3575 1102 3600 1102 3575 1096 3575 1111 3575 1095 3575 1088 3575 1096 3575 1094 3575 1094 3575 1084 3575 0 75 0 70 76 0 70 76 0 70 75 0 70 74 0 70 74 0 70 76 0 70 76 0 75 74 0 75 75 0 75 75 0 75 78 0 75 76 0 75 76 '0 75 76 0 75 76 0 75 771 0 75 7~ 0 75 7~ 0 75 75 0 70 75 A11-13R2 A11-12 526 3600 482 3600 150 516 3600 474 3600 150 468 3600 411 3600 145 397 3600 376 3600 210 538 3600 504 3600 100 550 3600 509 3600 100 546 3600 502 3600 100 544 3600 502 3600 100 538 3500 0 492 3600 125 543 3500 0 495 3600 !00 541 3500 0 490 3600 125 532 3500 0 484 3600 125 537 3500 0 482 3600 125 526 3500 01 476 3600 150 543 3500 482 3600 150 527 3500 472 3600 150 522 3500 464 3625 150! 525 3500 465 3625 150 520 3500 456 3625 15( 525 3500 450 3625 15( 518 3500 440 3625 125 A23 -01R ACT [ 1129 3650 3600 1116 3600 3575 1041 3600 3575 1143 3600 3500 1250 3600 3550 1232 3600 3575 1210 3600 3560 1207 3600 3575 1180 3525 3550 1186 3550 3575 I 186 3550 3575 1175 3550 3575 1170 3550 3575 1169 3550 3575 1184 3550 3575 1169 3650 3575 1162 3650 3575i 1179 3650 3575 1176 3650 3575 1176 3650 3575 1161 3650 3575 0 1200 1250 0 1200 1250 0 1200 1250 0 1150 1250 0 1150 1250 0 1180 1250 0 1200 1250 0 1200 1250 0 1180 1225 0 1170 1200 0 1,350 1,300] 0 1,219 1,265i 1097' 3575 1085 3575 1086 3575 1083 3575 1082 3575 1082 3575 1076 3575 1077 3575 1078 3575 1072 3575 0 70 75 0 70 75 0 72 75 0 70 78 0 70 78 0 70 78 0 70 78 0 70 78 0 70 78 0 70 77 526 3500 519 3500 521 3500 521 3500 524 3500 534 3500 524 3500 524 3500 518 36OO 517 3600 33,802 3,600 1,090 3,576 31 0 75 80 0 72 76 0 16,210 3,600 0 523 3,532 0 31 439 3625 125 430 3625 125 424 3625 125 421 3600 17C 419 3600 416 3600 408 3600 17C 404 3600 17¢ 401 3600 15C 401 3600 145 14,071 3,625 210 454 3,606 140 31 1180 3650 3575 1166 3650 3575 1165 3650 3575 1162 3650 355£ 1164 3650 355C 1193 3650 355¢ 1125 3650 355C 1151 3650 355~ 1147 3600 3575 1149 3600 3575 36,203 3,650 3,600 1,168 3,612 3,567 31 AI2-12 ACT [NJ INJ ANNU 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 ~ ACT I ' INJ I'NJ ANNU 0 30 1840 0 33 1860 0 29 1860 0 27 1850 0 27 1843 0 30 185( 0 33 184( 0 28 185( 0 28 184( 0 28 184( 0 35 184( 0 38 183( 0 38 · 0 38 0 0 35 184C 0 0 35 182C 0 0 39 182C 0 0 38 182C 0 0 33 181C 0 0 34 182C 0 0 34 181C 0 0 34 181C 0 0 36 181C 0 0 36 181C 0 0 35 180C 0 0 35 180C 0: 0 35 180C 0 0 35 180C 0! 0 35 180C 0 0 28 180C 0 0 23 180£ 0 O! 39 1,860 O, 0 33 1,825 : 0 A33-14 down due to annular communication problem· Form 10403 submitted to AOGCC on 11/19/1999 A34-14RDII down to reduce pressure on A33-14. Form 10403 submitted to AOG-CC on 11/19/1999. RECEIVED · 13 000 Alaska Oil 8, Gas Cons. Commission .~chorage WATER INJECTION REPORT PLATFORM A : '" Di~POS^LWELL '" ebrua~-2000 A34-14 A41A-I ILN A44-11 Al I-I 3R2 Al 1-12 A23-01R AI2-12 A33-14 01-Feb-2000 0 1450 145( 1096 3575 0 0 75 73 454 3550 0 429 3600 200 1123 3650 3550 0 0 ( 0 20 1150 02-Feb-2000 0 1450 145( Il04 3575 0~ 0 75 73 456 3550 0 430 3600 200 1124 3650 3550 0 0 C 0 20 1150 03-Feb-2000 0 1400 144( 1070 3575 0 0 70 80~ 439 3600 0 384 3600 200 1089 3600 3575 0 0 ( 0 21 Il70 04-Feb-2000 0 1400 144( 1088 3575 0 0 70 8( 439 3600 0 0 2900 370 Il09 3600 3575 0 0 ( 0 27 1240 05-Feb-2000 0 1400 1425 1080 3575 O[ 0 70 7g 437 3600 0 0 2850 450 1098 3600 3575 0 0 C 0 24 Il80 06-Feb-2000 0 1400 1425 1089 3575 0 0 70 7~ 438 3600 0 0 2850 500 Il06 3600 3575 0 0 ( 0 24 1790 07-Feb-2000 0 1400 142~ 943 3575 C 0 70 7~ 370 3600 . 0 469 2850 500 1015 3600 3575 0 0 ( 0 27 1840 08-Feb-2000 0 1400 142~ 1105 3500 C 0 70 78 381 3550 0 474 3550 - 200 1102 3550 3500 0 0 C 0 26 1850 · 09-Feb-2000 0 1370 140( 1110 3550 £ 0 70 78 460 3600 0 488 3600 175 1103 3600 3525 0 0 C 0 23 1860 10-Feb-2000 0 1370 140( 1120 3550 ( 0 70 78 519 3600 0 498 3600 150 1118 3600 3575 0 0 C 0 25 1860 II-Feb-2000 0 1360 140C 1123 3550 C 0 75 78 525 3600 0 496 3600 175 1121 3600 3575 0 0 C 0 25 1860 12-Feb-2000 0 1350 1400' 1098 3550 £ 0 75 78 490 3600 0 482 3600 150 1096 3600 3575 0 0 C 0 25 1860 13-Feb-2000 0 1340 140( Il01 3550 C 0 75 78 483 3600 0 480 3600 150 II00 3600 3575 0 0 14-Feb-2000 0 1340 140£ II01 3550 ( 0 75 78 479 3600 0 481 3600 150 1107 3600 3575 0 0 0 0 25 15-Feb-2000 0 1320 140( 1064 3550 ( 0 75 75 493 3600 0 482 3600 150 llll 3600 3575 0 0 C 0 22 1860 16-Feb-2000 0 1320 135C 1103 3550 C 0 75 76 493 3600' 0 474 , 3600 150 il02 3600 3575 0 0 G 0 25 186( 17-Feb-2000 0 1320 1375 I100 3550 ~ 0 75 75 490 3600 01 471 3600 150 Il01 3650 '3575 0 0 0 0 25 185( 18-Feb-2000 0 1310 1375il05 3550 C 0 75 76 507 3600 0 470 3600 150 !124. 3650 3575 0 0 G 0 22 185( ]9-Feb-2000 0 1320 1375 1140 3575 0 0 75 78 538 3600 ( 499 3650 150 1154 3650 3575 0 0 0 0 23 185( ~0-Feb-2000 0 1310 13751121 3600 O 0 75 78 507 3600 C 490 3650 150 !131 3650 3575 0 0 0 0 28 185( 2 I-Feb-2000 0 1300 1375 1123 3600 ~ 0 75 81 518 3650 £ 497 3650 150 1139 3650· 3575[ 0 0 0 0 28 1850 22-Feb-2000 0 1300 13501725 3600 0 0 75 80 521 3600 £ 498 3650 125 1137 3700 3575 0 0 0 0 28 1850 23-Feb-2000 0 1300 1350537 3600 0 0 75 80 527 3600. C 503 3650 125 Il51 3650 360( 0 0 0 0 28 185( 2,l-Feb-2000 0 1300 13501122 3600 0 0 75 80 529 3600 ( 497 3650 150 I 137 3650 355( 0 0 0 0 28 1840 25-Feb-2000 0 1300 1350 1118 3600 0 0 75 80 532 3600 C 494 3650 150 1130 3650 355( 0 0 0 0 28 184( 26-Feb-2000 0 1300 1350 1121 3600 0 0 75 80 534 3600 C 494 3650 150 Il31 3650 355( 0 0 0 0 28 184( 27-Feb-2000 0 1300 13501114 3600 0 0 75 80 529 3600 C 486 3650 150 1122 3650 355C 0 0 0 0 28 184( 28-Feb-2000 0 1300 1350 1113 3600 0 0 75 80 536 3600 C 484 3650 150 1122 3650 355C 0 0 0 0 28 184C 20-Feb-2000 0 1350 1260 Ill0 3550 0 0 75 80 533 3600 C 481 3600 150 1120 3650 355C 0 0 0 0 28 184C TOTAL 0 31,944 0 14,157 12,431 32,323 0 0 MAXIMUM !,450 1,450 . 3,600 0 75 81 3,650 0 3,650 500 3,700 3,600 0 0 28 1,860 AVERAGE -- 0 1,348 I.,387 1,102 3,571 0 0 74 78 488 3,597 0 429 3,514 199 I,i15 3,626 3,565~ 0 0 0 0 25 1,732 # DAYS 0 29 0 29 26 29 0 0 03/09/2000 14 down due [o annular communication problem. Form 10-403 submitted to AOGCC on I 1/19/1999 14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AOGCC on 11/19/1999. WATER INJECTION REPORT PLATFORM DISPOSAL WELL Janua~-2000 A34-14 A41A-I ILN A44-1 I Al 1-13R2 Al 1-12 A23-01R Al2-12 A33-14 01-Jan-2000 0 1750 1650 ili0 3600 C0 74 76 458 3500 C 441 3600 15G Il51 3650 3450 0 0 0 '~. 0 0 80~ 02-J~in-2000 0 1750 1650 1102 3600 E0 75 76 461 3500 ~ 434 3600 15~ 1139 3650 3450 0 0 00 0 80~ 03-Jato-2000 0 1750 1650 1105 3600 . a0 75 76 469 3500 C 432 3600 150 1137 3650 3450~ 0 0 00 0 801 04-Jan-2000 0 1700 1650 1094 3600 00 75 76 464 3500 0 426- 3600 175 1135 3650 34501 0 0 0 0 0 75~ 05-Jan-2000 0 1700 1650 1122 3600 00 75 76 490 3500 a 400 3600 175 1142 3650 345c 0 0 00 0 06-Jan-2000 0 1560 1575 1086 3575 00 70 76 485 3600 0 445 3600 170 1113 3600 3575 0 0 00 0 901 07-Jan-2000 0 1550 1575 IlOI 3575 0 0 70 76 492 3600 0 417 3600 190 1124 3600 3571 0 0 0 0 0 901 08-Jan-2000 0 1575 1575 - 1098 3575 0 0 70 78 498 3600 ' 0 415 3600 ' 175 1124 3600 3575 0 0 0 0 0 90( 09-Jan-2000 0 1575 15751098 3575 0 0 70 78 494 3600 0 369 3600 2001122 3600 3575 0 0 0 0 0 901 10-Ja~-2000 0 1575 1575 II01 3575 0 0 70 76 501 3600 0 383 3600 2201127 3600 3575 0 0 0 0 0 97: II-Jan-2000 0 1575 15751091 3575 0 0 70 76 503 3600 0 397 3600 2001123 3600 3575 0 0 0 0 0 90~ 12-Jan-2000 0 1575 1575 Il31 3575 0 0 70 76 530 3600 0 419 3600 200 1157 3600 3575 ~0 0 O 0 0 951 13-Jan-2000 0 1500 1550 1095 3600 0 0 75 76 515 . 3600 0 409 3600 2001122 3600 3600 0 0 C 0 01 14-Jan-2000 0 1500 1550 Il13 3600 0 0 75 7~ 518 3600 0 416 3600 200 1134 3600 3600 0 0 C 0 15-Jan-2000 0 1500 155CIlOI 3600 · 0 0 75 78 504 3600 0 414 3600 . . 200 il27 3600 3600 0 0 E 0 O 90( 16-Jan-2000 0 1500 155~ 1097 3600 C 0 75 78 472 3600 C 415 3600 20£1125 3600 3600 0 0 ~ 0 0 90( 17-Jan-2000 0 1500 155~1102 3600 C 0 75 78 480 3600 ~ 421 3600 20C 1138 3600 3600 0 0 0 0 0 90( l'8-Jan-2000 0 1500 155~1095 3600 G 0 75 78 477 3600 ~ 419 3600 20C 1129 3600 3600 0 0 0 0 0 95( 1~9-Jan-2000 0 1500 15501084 3600 ~ 0 75 78 474 3600 ~ .' 414 3600 20GIl15 3600 3600 0 0 0 0 0 95( 20~Ja~-2000 0 1450 1500Il09 3600 ~ 0 75 80 478 3600 fl 424 3650 20fl 1138 3650 3575 0 0 0 0 0 98( 2t-Jan-2000 0 1450 1500IlO0 3600 0 0 75 78 484 3500 0 424 3600 200 1132 3650 ' 3575' 0 0 0 0 0 90( 22-Jan-2000 0 1425 1500llOI 3600 0 0 75 79 481 3550 0 422 3600 2001132 3650 3575 0 0 0 0 0 89C 23-Jan-2000 0 1425 1500 1094 3600 0 0 75 81 481 3550 0 420 3600 200 1126 3650 3575 0 0 0 0 0 89~ 24-Jan-2000 0 1425 1500 1091 3600 0 0 75 81 471 3550 0 417 .3600 200 !119 3650 3575 0 0 0 0 0 98C 25-Jau-2000 0 1420 15001107 3600 0 0 75 79 482 3550 0 426 3600 200 1136 3650 3575 0 0 0 0 0 90£ 26-Jan-2000 0 1420 1475 1106 3575 0 0 75 77 493 3550 0 428 3600 2001143 3650 3575 0 0 0 0 0 875 27-Jan-2000 0 1450 1450 Il02 3575 0 0 75 77 482 3550 0 425 3600 2001132 3650 355£ 0 0 0 0 0 925 28-Jan-2000 0 1450 1450 1099 3575 0 0 75 77 479 3550 0 425 3600 200 . '1129 3650 355~ 0 O 0 O' 0 90£ 29~J~n-2000 0 1450 1450 IlOI 3575 0 0 75 77 476 3550 0 429 3600 200 Il31 3650 355¢ 0 0 0 0 0 90C 30-Jan-2000 0 1450 1450 Ill4 3575 0 0 75 77 493 3550 0 434 3600 200il42 3650 355¢ 0 0 0 0 0 90£ 31-Jan-2000 0 1450 14501082 3575 0 0 75 77 467 3550 0 420 3600 200 1109 3650 355C 0 0 0 O. 0 95C ,TOTAL 0 34,132 0 15,052 12,980 35,053 0 0 MAXIMUM 1,750 1,650 3,600 0 75 81 3,600 0 3,650 220 3,650 3,600 0 0 0 980 AVERAGE 0 1,529 1,544 I, I OI 3,590 00 74 77 486 3,565 0 419 3,602 192 I,I 31 3,627 3,556 0 0 0 0 ' 894 # DAYS 0 31 0 31 31 31 0 0 02/I 0/2000 __ ~33-14 down due to annular communication problem. Form 10-403 submitted to AOGCC on I 1/I 9/1999. ~4-14RDII down to reduce pressure on A33-14 Form 10-403 submitted to AOGCC on I 1/19/1999. ~~' WATER INJECTION REPORT PLATFORM A December-99 01-Dec-99 02-Dec-99 03-Dec-99 04-Dec-99 05-Dec-99 06-Dec-99 07-Dec-99 08-Dec-99 09-Dec-99 10-Dec-99 1 l-Dec-99 12-Dec-99 13-Dec-99 14-Dec-99 15-Dec-99 16-Dec-99 17-Dec-99 18-Dec-99 19-Dec-99 20-Dec-99 21 -Dec-99 22-Dec-99 23-Dec-99 24-Dec-99 25-Dec-99 26-Dec-99 27-Dec-99 28-Dec-99 29-Dec-99 30-Dec-99 31 - Dec-99 TOTAL MAXIMUM AVERAGE # DAYS 01/13/00 A34-14 A41A-IILN INJ INJ ANNU 0 1925 1925 0 1900 1900 0 1900 1900 0 1900 1900 0 1900 1900 0 1900 1900 0 1900 1850 0 1800 18001 0 1800 1825 0 1800 1825 0 1800 1800! 0 1775 1775 0 1775 1775 0 1775 1775 0 1750 175C 0 1750 175£ 0 1800 175f 0 1800 175£ 0 1750 175£ 0 1775 1725 0 1750 170£ 0 1750 170£ 0 1750 170~ 0 1750 165£ 0 1750 165c 0 1750 1675 0 1750 1675 0 1700 165c 0 1750 165c 0 1750 16501 0 1750 1650 0 ! 34,343 1,925 1,9251 3,650 0 0 1,796 1,7641 1,108 3,560 0 0 31 DISPOSAL WELL I A44-11 I AII-13R2 ' 117 3550 108 3550 111 3550 I!0 3550 104 3550 117 3550 I099 3550 1109 3550 I087 3550 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 70 81 0 70 8~ 0 70 8C 0 70 7S 0 70 Y 8~ 0 80 8~ 0 80 8C 0 80 7'~ 0 80 7J 0 80 8C 0 80 8C 0 80 8C 0 70 7{5 0 70 7~ 0 70 7'~ 0 70 8C 0 70 7{5 0 70 81 0 70 7{5 0 70 0 74 481 3500 458 3500 453 3500 456 3500 463 3500 471 3500 471 350O 547 3500 459 3600 AIl-12 ACT I INJ I INJ ANNH I 465 3575 200 460 3575 200 463 3575 2O0 460 3575 200 456 3575 200 461 3575 200 456 3575 200 460 3575 200 451 3600 200 il01 3550 0 1106 3550 0 il04 3550 0 1108 3550 0 1087 3550 0 Il07 3550 0 1115 3550 0 1098 3550 0 1114 3550 0 Ii01 3550 0 1097 3550 0 1113 3650 0 1113 3550 0 Il13 3550 0 1120 3575 0 1127 3575 0 il08 3575 0 1099 3575 0 !104 3575 0 1122 3575 0 I114 3575 0 !110 3600 0 o 80 86 o 72 82! o 557 3600 532 3600 514 3600 511 3600 487 3600 493 3600 494 3245 490 3400 495 3400 480 3400 484 3450 512 3450 504 3450 495 3500 501 3500 501 3500 479' 3500 465 3500 470 3500 474 3500 467 3500 461 3500 15,125 3,600 488 3,500 31 459 3600 200 456 3600 200 0 456 3600 200 0 458 3600 200 0 447 3600 200 0 452 3600 · 200 0 455 3575 200 0 450 3575 200 0 453 3575 150 0 442 3550 150 0 445 3575 200 0 463 3600 150 0 459 3600 150 0 461 3600 175 0 467 3600 150 0 468 3600 150 454 3600 150 446 3625 150 0 447 3625 175 0 456 3600 150 0 451 3600 150 0 445 3600 150 14,122 0 3,625 200 0 456 3,590 181 31 A23-0 i R INJ INJ ANNU 1121 3600 3475 I I I I 3600 3450 1120 3600 3450 I I 18 3600 3450 1107 3600 3450 I 124 3600 3450 I I l I 3600 3450 I 118 3600 3450 1106 3600 3425 I I i 8' 3600 3425 1117 3600 3430 I 113 3600 3450 1127 3600 3430 1104 3600 3460 1121 3600 3430 1134 3650 . 3450 AI2-12 { A33-14 I ..... I I I 0 0 0 0 0 975 0 0 0 0 0 100C 0 0 0 0 0 1000 0 0 0 0 0 950 0 0 0 0 0 950 0 0 0 0 0 950 0 0 0 0 0 950 0 0 0 0 0 925 0 0 0 0 0 925 0 0 0 0 0 925 0 0 0 0 0 950 0 0 0 0 0 960 0 0 0 0 ~ ~ o o o! o 0 0 0 0 0 1025 0 0 01 0 0 1050 Il14 3650 3450 1130 3650 3450 1108 3650 3450 Il20 3650 3450 il49 3650 3500 1142 3650 3450 1146 3650 3450 1158 3650 3475 1164 3650 3475 1136 3650 3475 1127 3650 3475 '1136' 3650 3450 1169 3650 3450 1157 3650 3450 1151 3650 3450 34,977 3,650 3,500 1,128 3,626 3,452 31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1050 o' 0 0 1000 0 0 0 975 0 0 0 975 0 0 0 925 0 0 0 900 0 0 0 900 0 0 0 925 0 0 0 900 0 0 0 900 0 0 0 850 0 0 0 850 0 0 0 850 0 0 0 850 0 0 0 800 o 0 1,050 o o o 941 o 33-14 down due to annular communication problem. Form 10403 submitted to AOGCC on I I/I 9/I 999. 34-14RD11 down to reduce pressure'on A33-14. Form 10-403 submitted to AOGCC on 11/19/1999 WATER INJECTION REPORT PLATFORM A November-99 I A34-~4 I DISPOSAL WELL I A41A-I ILN I A44-I I ~J~ I~i~:i t~0'~'~1 :: ~ :: i i :: i i i :: i::i :: i i i iI' [NJ ] INJ [ANNU 01 -Nov-9O 02-Nov-99 03-Nov-99 04-Nov-99 0S-Nov-99 06-Nov-99 07-Nov-99 08-Nov-99 09-Nov-99 I O-Nov-99 I I -Nov-99 12-Nov-99 13-Nov-99 14-Nov-99 15-Nov-99 16-Nov-99 17-Nov-99 18-Nov-99 19-Nov-99 20-Nov-99 21-Nov-99 22-Nov-99 23-Nov-99 24-Nov-99 25-Nov-99 26-Nov-90 27-Nov-OO 2g-Nov-99 29-Nov-99 30-Nov-99 TOTAL MAXIMUM AVERAGE # DAYS 12/I 3/99 796 3500 3475 814 3600 3600 830 3550 3600 830 3600 3600 829 3600 3600 816 3600·3600 820 3600 3600 820 3600 3600 830 3600 3600 833 3600 3600 826 3600 3600 855 3600 3600 825 3600 ~3600 833 3600 3600 852 3600 3600 841 3600 3600 846 3600 3600 853 3600 3600 501 2600 2600 0 2300 2300 0 2250 2250 0 2150 2150 0 2125 2125 0 2075 2075 0 2020 2020 0 2020 2000 0 2050 2000 0 2000 1975 0 2000 1950 0 1950 1950 15,450 3,600 3,60O 515 3,006 3,002 19 1117 3500 1121 3550 1142 3550 1131 3600 1131 3600 Il19 ' 3600 1120 3600 Il18 3600 1129 3600 1125 3550 1044 3550 Il13 3550 1091 3550 1107 3550 1134 3550 1119 3550 1125 3550 1132 3550 1102 3550 1089 3550 Il13 3550 1114 3550 1093 3550 IlO? 3550 1140 3550 Il04 3550 IIII 3550 1124 3550 1097 3550 1127 3550 33,432 3,600 0 I,II4 3,558 30 0 70 93 0 70 91 0 70 90 0 70 9c 0 70 9(3 0 70 9(3 0 70 9(3 0 70 90 0 70 9(3 0 70 9(3 0 70 91 0 70 91 0 70 9i 0 70 91 0 70 88 0 70 89 0 70 89 0 75 88 0 75 90 0 75 90 . 0 75 90 0 75 '90 0 75 90 0 75 88 0 70 87 0 70 86 0 70 86 0 70 86 0 70 86 0 70 86 0 75 93 0 71 89 0 Al 1-13R2 553 3500 672 3~00 618 3500 589 3600 545 3600 603 3600 576 3600 582 3600 567 3600 564 3~00 572 3600 620 3600 578 3600 582 3600 656 3600 667 3600 647 3600 613 3600 437 3600 546 3450 531 3450 408 3500 513 3500 509 3500 1521 3600 503 3500 493 3500 516 3500 489 3500 507 3500 17,777 3,600 593 3,550 30 479 3525 225I 492 3575 1751 498 3575 175 495 3600 15C 493 3600 150~ 484 3600 15ff 485 3600 175 483 3600 175 4'90 3600 175 490 3600 175 486 3600 160 500 3600 150 482 3600 140 485 3600 15C 497 3600 14C 493 3600 12C 492 3600 I lC 496 3600 15C 458 3600 15(3 458 3575 20(3 472 3600 20(3 473 3600 20(3 463 3600 20(3 443 3600 20(3 479 3600 20C 465 3575 225 466 3575 225 470 3575 20C 461 3575 20£ 472 3575 20C 14,400 0 0 480 30 3,600 225 3,591 175 A23-OIR AI2-12 ^ TI I I^cTI I I10 3600 340C 133 3650 345C 155 3650 3'45C 151 36O0 350C 149 3600 350¢ 131 3600 350C 138 3600 345C 131 3600 345C 143 3600 345C 138 3650 345C 140 36OO 345C 171 3600 345C 131 3600 346C 140 3600 344C 167 3600 345C 153 3600 3475 156 3600 345C 166 3600 345(3 1097 3600 3475 I00 3575 3450 125 3550 3450 121 36O0 345(3 107 36O0 345~ 105 3600 345(3 145 3600 345(3 108 3600 345C 114 3600 345C 124 3600 345C 104 3600 3475 130 3600 345C 33,983 3,650 3,500 1,133 3,603 3,456 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A33-14 · t 0 1275 1275 0 1050 1075 0 950 I000 0 I000 I000 0 I000 1000 0 1000 1000 0 I000 I000 0 1000 1000 0 I000 1000 0 800 800 0 850 850 0 450 475 0 20 1850 0 20 Il50 -0 20 105C 0 0 IIOC 0 0 95C 0 0 IOOC 0 0 95C 0 0 90C 0 0 9OO 0 0 850 0 0 850 0 0 850 0 0 925 0 0 925 0 0 lO00 0 0 975 0 2,000 2,075 0 44' ~060 0 ,3-14 down due to annular communication problem. Form 10-403 submitted to AOGCC on I 1/19/1999. 4-14RDII down to reduce pressure on A33-14. Form 10-403 submitted to AC)GCC on I 1/19/1999. ALASKA OIL AND GAS CONSERVATION COMMISSION MONTHLY INJECTION REPORT 20 AAC 25.432 ROSS TIMBERS OPERATING COMPANY Name of Operator MIDDLE GROUND SHOAL Field and Pool .: November-99 Month and Year of Injection 1. 2. 3. 4. 5. Well # APl # Type Field & Method 50- Pool Code TUBING PRESSURE CASING PRESSURE 6. 7. 8. 9. 10. Days in MAX Average MAX Average Operation PSIG PSIG PSIG PSIG DAILY AVERAGE INJECTION 11. Liquid (~nL) 12. Gas (MCF) TOTAL MONTHLY INJECTION 13. 14 Liquid Gas (nnL) (MCF) Il-12 7331008300 4 524114 6 11-13R2 7332000701 4 524114 6 12-12 7332004400 4 524114 6 23-01R 7332023801 4 524114 6 33-14 7332005700 4 52¢114 6 41A-liLN 7332017903 4 524114 6 34-14 7331008601 4 524114 6 23-23 7332010200 4 524114 6 23-26 7332007100 4 524114 8 24-23 7332014501 4 524114 6 34-23 7332004100 4 524114 6 41-23 7332016300 4 524114 6 41-26 7332040900 4 524114 8 24A-23 7332040100 4 524114 6 44-I1 7332002700 5 524036 9 4414RD 7332025201 5 524036 9 30 3,600 3,591 225 30 3,600 3,550 0 0 0 0 0 30 3,650 3,603 3,500 0 2,000 449 2,075 30 3,600 3,558 0 19 3,600 3,006 3,600 30 3,500 3,440 3,110 0 50 50 0 30 3,500 3,499 3,500 30 3,560 3,549 0 0 750 715 650 0 645 637 450 30 3,500 3,498 140 0 .75 71 93 0 0 129 550 175 0 0 3,456 1,060 0 3,002 3,108 0 3,500 0 65O 450 115 89 550 480 593 0 1;133 0 1,114 515 1,374 0 391 1,965 0 0 125 0 0 14,400 17,777 0 33,983 0 33,432 15,450 41,207 0 11,729 58,942 0 0 3,741 0 0 i~ereby certify that the foregoing is tree and/gafrect to the best of my knowledge. Total 230,661 itle: Office Manager Date: I 0-Dec-99 Form lO~06 ,~nn 10-406 Rev 07127/99 Submi! in Duplicate From the Ollice of, ' Bill Penrose Date: ,August 20~ 2001 ....... To: Tom Maunder Fax: 276-7542 Pa~cg~: 4 ,.{~cluding cover) XTO A34-14 P&A RECEIVED AUG ~0 ~001 Alaska 01i & G~ Cons. O0~flllllSSiOl" Anchoraoe Fairweather E&P Services, Inc. 715 L Slreet, Anchorage, Alaska 99501 Phone: (907) 251~-3446 Fax: (907) 258-5557 E-mail' bill@fairweather.com I'A~'. ^ I L./ VV~II/q.,~,¥'f- Iq'--I" I L/ ! I ~-U,~L/ Subject: Re: XTO Well A34-14-PTD 175-030 Date: Mon, 20 Aug 2001 10:33:06 -0800 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: Bill Penrose <bili@fairweather. com> Bill, Thanks for the email and fax regarding your fishing/washing/milling operations on A34-14. You indicate that operations are not proceeding smoothly due to suspected settled barite from the 13.5 ppg kill fluid left in the well. The rig has not been able to pump into the formation with 3000 psi surface pressure. It does appear that as you indicate, the previously open intervals in the wellbore are now plugged. Your proposal is to cease fishing operations, install a bddge plug in the 7" casing above the present tubing stub and cap that BP with 100' of cement. You will then continue with the previously approved plan to cut and pull the 7" casing from about 3700', install a 9-5/8" retainer, squeeze cement below it and lay in cement above it. After cleanout, you would proceed to mill the window and sidetrack the well. Your proposal is acceptable. You have demonstrated that the old completion interval is effectively plugged with a positive pressure test and the remaining cased hole section will remain filled with 13.5 ppg mud. The bridge plug and cement cap will effectively isolate the old wellbore. Good luck with the remaining operations. Tom Maunder, PE Petroleum Engineer AOGCC Bill Penrose wrote: > Tom, > Per our discussion this morning, I'm writing to propose a new course of > action in the P&A of XTO Well A34-14RD so we can proceed with sidetracking >it. > I'm faxing you under separate cover the originally approved plan. It > involves pulling the old tubing, setting a cement retainer above the > producing interval (all Hemlock) and squeezing cement. We have had the rig > over the well for several days now and the situation we're facing warrants a > different course of action. First, the old tubing we're pulling out is > badly corroded and is coming out in small pieces. When we first picked up > on the tubing, it came apart at 4,100'. We then latched onto the rest with > an overshot and pulled until it came apart again. We recovered 5-1/2 > joints. We went in again with an overshot and recovered 3 joints. We're > now back on the tubing going for additional recovery. Furthur, we've found > that apparently some barite has settled out of the mud and plugged the > tubing down deep as we can pressure up on the well to 3, 000 psi and it holds > like a jug. > > Due to the diminishing returns in our tubing retrieval efforts and the lack > of ability to inject cement even if we did get it all out, / propose that we > set a bridge plug at the top of the tubing fish where we are now (+4, 400') > and set a 100' cement plug on top of it. Our permitted plan for the > subsequent sidetrack includes cutting and pulling the 7" casing from 3, 700' > and a cement plug being set across the top of the stub, so there will 1 of 2 8/20/01 10:34 AM > eventually be 2 mechanical and 2 cement plugs in this well. > Please let me know if you have any additional questions. As soon as we hear > from you, we'll set a new course of action in motion. > Regards, > Bill Tom Maunder<tom maunderL'~.admin.state.ak, us> Petroleum Engineer tAlaska Oil and Gas Consewalion Commission · 2 of 2 8/20/01 10:34 AM Subject: XTO Well A34.14 Date: Mon, 20 Aug 2001 09:05:09 -0800 From: "Bill Penrose" <bili@fairweather.com> To: "Tom Maunder \(E-mail\)" <tom_maunder@admin.state.ak.us> CC: "Bobby Smith \(E-mail\)" <bobby_smith@xtoenergy. com>, "Doug Schultze \(E-mail\)" <doug_schultze@xtoenergy. com>, "XTOC Drlg Platforms \(E-mail\)" <drilling@sarcomgs.com> Tom, Per our discussion this morning, I'm writing to propose a new course of action in the P&A of XTO Well A34-14RD so we can proceed with sidetracking it. I'm faxing you under separate cover the originally approved plan. It involves pulling the old tubing, setting a cement retainer above the producing interval (all Hemlock) and squeezing cement. We have had the rig over the well for several days now and the situation we're facing warrants a different course of action. First, the old tubing we're pulling out is badly corroded and is coming out in small pieces. When we first picked up on the tubing, it came apart at 4,100'. We then latched onto the rest with an overshot and pulled until it came apart again. We recovered 5-1/2 joints. We went in again with an overshot and recovered 3 joints. We're now back on the tubing going for additional recovery. Furthur, we've found that apparently some barite has settled out of the mud and plugged the tubing down deep as we can pressure up on the well to 3,000 psi and it holds like a jug. Due to the diminishing returns in our tubing retrieval efforts and the lack of ability to inject cement even if we did get it all out, I propose that we set a bridge plug at the top of the tubing fish where we are now (+4,400') and set a 100' cement plug on top of it. Our permitted plan for the subsequent sidetrack includes cutting and pulling the 7" casing from 3,700' and a cement plug being set across the top of the stub, so there will eventually be 2 mechanical and 2 cement plugs in this well. Please let me know if you have any additional questions. As soon as we hear from you, we'll set a new course of action in motion. Regards, Bill 1 of 1 8/20/01 10:17 AM · Cross Timbers p~rating Compa~ny' ' Prepared by: irs 5121199 Checked by: MGS A34-14RDII WIW Cook Inlet, Alaska .ag 1, Conductor § 'APl No.: Spud: Jarl 1966 P&A Orlg WB P&A ST 12/7{~ Spud ,ST 6/76 CTI 5';~Jr'f Cs[J: 13 3/8", 81 lb, J55, Set 0.i!), [)-15§5'. cmrd w/800 lnlermed Csg: 9 5/8", 40 lb, NS0 L"~'FC;. Set @ 0-5638', Crnrd w~ '700 sx~ KI~; Water Depth.' Tubing: 3 t/2", 9.31t, N80 EUE 8rd @ 0- 11838'. 1111982 Otis "X" Nipple ~ Camco Mandrel @ 10830' MD (8011)' 3'VD) (Dummy) Gul~rson U~t-Packer vii ~ 10899' MD (8~2' 'rVD) Call!CO Martdml ~ 1105P' MD (Bt 86' TV~) (Dummy) ~lbemon Un,-Packer VII ~ 11158' ~ (8264' Gulberson IJnl-Pack~ VII ~ 11532' MD Camco Ma~rel ~ 11659' MD (8673' ~D) Gulberson Uni-Paclter Vii ~ 11787' MD (8778' O[is '~' Nipple ~ 1 ~806' MD (e794' '~) Guibers0n Shear Sub [EOT) ~ 11838' MD Prod Csg: 7" 29 lb N80 @ 0-66', 26 lb., sg5 New @ 66-6657'. NSO Used X,,Line @ 6667'-12100', Cmt wi 845 sx, HC-HE): 11049',,11110' HE-HF: 11210' I-IK-HN: 11574'- 11576' HN-HR: 11700'.,11740' HR-HZ: 11806'- 11 [172' HR,-HZ; '11890'-11940' TD: 12010' ' t LO: '12100' XTO Energy, Inc. !, MGS A34=Ii4RD De,¢0m.p[efi0n _P edure Pre~. Rio 'Work 1. Test the annulus seal on the 7" pack0ffto 2,000 psi. 2. Check for pressure on the 7" X %5/8" annulus. Bleed off if necessary. 3. Load the 7" X 9-5/8" annulus with 13.5 ppg mud. Ri~ Work Note: Notify AOGCC 24 hours before testing BOPE. 4_ Move rig over well. Check for pressure on thc 7" X 9-5/8" annulus and bleed off i f necessary. , Bleed off pressure on tubing and 7" annulus. Ensure well is dead by circulating 13.5 .ppg mud down the tubing, through the tubing cut at 10,868' and ~aking returns via the annulus. Monitor well to ensurcit r~nmins dead. . Install BPV, Nfl) tree, N/U BOPE. Install 3-1/2 rams. Test BOPE to 250/3,000 psi. Notify AOGCC 24 hours in advance of test. [Note: at the discretion oftl~e Drilling Supervisor and AOC~C Inspector (if present), blind .rams will be tested after tubing is pulled 'from bole ifthere is a chance a gas bubble will settle under BPV, making it difficult or dangerous to release.] 7. M/U landing joint to tubing hanger, 'hack out lock-down ~erews and pull hanger to drill floor. Circulate bottoms up with 13.5 ppg mud. Ensure well is dead. 8. POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry mad send to "shore. 9. P/U a 6" bit ami 7" ca.,ting ~-mper on 3-1 I2" drill pipe. RIH and lightly tag the tubing stub at 10,868' MD. 10. POH, ~anding back 3-1/2" drill pipe and L/D casing scraper and bit. 11. M/U a 7" cement retainer. RIH to 10,900' (32' above the tubing stub) and set the retainer. RECEIVED AUO 20 2005 Oil & Gas CONS. Anchorage 12. Eslablish injectivity into the peflbra~ions I~low the retainer. 13. R/U BJ. Hold PJSM and pressure test the cementing lines to 5,000 psi. 14. Un-sting from the retainer and establish circulation. 15. 16. While un-stung froJn the ret. ainer, mix and pump 10 bbis of fresh water pre-flush, then 46 bbls of cement mixed as follows: 225 sx Class O cement 4., 0_2% hwoe CD-32 + 0.15% bwoc R-3 + 44.2% 'fresh water. Slurry Wt. 15.8 ppg Slurry Yield 1.15 cf/fit Mix Water 4.98 gps When fl~e fresh water pre-flush is at the end ofthe drill pipe, sting into the retainer and squeeze thc preflush and cement below the retainer. 1,7. Displace with 71 bills ,,f 13.5 ppg mud. l)o not 0ver4isplaee. 18. Un:sting from the retainer and reverse out. Shut down ami ensure well remains dead. 19. R/D BJ and POll laying down. all but 3,800' o'f3- I/2" drill pipe. 20. Proceed with sidetrack procedure to drill A34-14LW. A34-14RD Abandonment Sundry Subject: A34-14RD Abandonment Sundry Date: Wed, 6 Jun 2001 08:37:53 -0800 From: "Bill Penrose" <bill@fainNeather. com> To: "Tom Maunder \(E-mail\)" <tom_maunder@admin.state.ak. us> CC: "Doug Marshall \(E-mail\)" <marshall@sarcomgs.com>, "Doug Schultze \(E-mail\)" <doug_schultze@xtoenergy.com>, "Bobby Smith \(E-mail\)" <bobby_smith@xtoenergy.com> Tom, You had asked me to supplement the XTO Sundry for the A34-14RD abandonment with an e-mail stating our intent to pull the valves from the GLM's between and below the packers before pumping cement. Yesterday, we attempted to enter the hole with slickline without success. The tubing is apparently scaled up right up to near the surface. Our current plan is to clean out the production tubing with coiled tubing, then punch holes in the production tubing between and below the packers before cutting the tubing above the top packer and proceeding as indicated in the original Sundry procedure. I think this will actually give us a better abandonment cement job, though I would rather have not had to use the coiled tubing. Let me know if you have any questions on this. Regards, Bill 1 of 1 6/8/01 2:59 PM Cross Timbers Operating Company June 1,2001 Ms. Julie Heusser, Commissioner Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Application for Sundry Approval; P&A of MGS Well A34-14RD, Cook Inlet, Alaska Dear Commissioner Heusser, XTO Energy, Inc. (formerly Cross Timbers Operating Company) hereby applies for Sundry Approval of its plan to permanently abandon the perforations existing in Middle Ground Shoal Well A34-14RD to allow the sidetracking of that well to drill A34-14LW. The Application for Permit to Drill A34-14LW is submitted under separate cover. The anticipated commencement date of this work is approximately June 25. The perforations will be abandoned by cutting and recovering the tubing above the topmost of the four existing packers, then pumping sufficient cement via drill pipe through the tubing tailpipe and across the perforations to be abandoned. The packer and plug integrity will then be verified and the well sidetracked to a new location in the reservoir. XTO Energy requests continuation of the variance from the BOPE requirements of 20AAC25.035(e) as requested in our letter of January 30, 2001 (copy attached). The rationale is the same as was set out in that letter. Pertinent information attached to this application includes the following: 1) Form 10-403 Application for Sundry Approval 2) A copy of the proposed abandonment procedure 3) A schematic showing the current condition of the wellbore 4) A copy of the January 30, 2001 BOPE variance request If you have any questions or require additional information, please contact me at (915) 620-6718 or Bill Penrose at (907) 258-3446. 3000 North Garfield, Suite 175, Midland, Texas 79705 (Q1 ['~ RRg-RRTq ~v /(3t ~ Ms. Julie Heusser Page 2 Sincerely, XTO ENERGY, INC. Bobby L. Smith Drilling/Operations Manager enclosures cc' Bill Penrose Doug Marshall Mike Langeler Paul Figel STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: IX] Abandon [ ] Suspend [X] Plugging [ ] Time Extension [ ] Perforate [ ]Alter Casing [ ] Repair Well [ ]Pull Tubing [ ]Variance [ ]Other [ ] Change Approved Program [ ] Operation Shutdown [ ] Re- Enter Suspended Well [ ] Stimulate 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) XTO ENERGY, INC. [X] Development 116' DF [ ] Exploratory 3. Address [ ] Stratigraphic 7. Unit or Property Name 3000 NORTH GARFIELD, SUITE 175, MIDLAND, TEXAS 79705 [ ] Service Middle Ground Shoal 4. Location of well at surface v/' v" ,./~ 8. Well Number 1622' FSL, 432' FEL, SEC 11, T8N, R13W, SM A34-14RD At top of productive interval 9. Permit Number 402' FSL, 2152' FEL, SEC 14, T8N, R13W, SM 175-030 At effective depth 10. APl Number 135' FNL, 2310' FEL, SEC 23, T8N, R13W, SM 50-733-10086-01 At total depth 11. Field and Pool 193' FNL, 2329' FEL, SEC 23, T8N, R13W, SM Middle Ground Shoal 12. Present well condition summary Total depth: measured 12,100 feet ~ Plugs (measured) None true vertical 9,032 feet Effective depth: measured 12,010 feet Junk (measured) None true vertical 8,958 feet Casing Length Size Cemented MD TVD Structural Conductor Surface 1,565' 13-3/8" 800 sx 1,565' 1,547' Intermediate 5,638' 9-5/8" 700 sx 5,638' 4,605' Production 12,100 7" 845 sx 12,100' 9,032' Liner Perforation depth: measured 11,049' - 11,940' (6 intervals) True vertical 8,175' - 8,901' (6 intervals) Tubing (size, grade and measured depth) 3-1/2", 9.3#, N-80, EUE 8rd at 11,838' Packers and SSSV (type and measured depth) No SSSV, 7" Guiberson Uni-Packet VII at 10899', 11158', 11532' and 11787' MD 13. Attachments [X] Description of Sumary Proposal [ ] Detailed Operations Program [X] BOP Sketch 14. Estimated date for commencing operation 15. Status of well classification as: 25-Jun-01 16. If proposal was verbally approved [ ] Oil [ ] Gas [ ] Suspended Name of approver Date Approved Service: Water Injector Contact Engineer Name/Number: Bill Penrose (907) 258-3446 Prepared By Name/Number: Bill Penrose (907) 258-3446 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~_~ L ~ Title: Bobby L. Smith, Operations/Drilling Manager Date ~/I/~/ ' / '~ Commission Use Only Conditions of Approval: Notify Commission so representative may witness ..~~ 9~, [~I~ .~,.~. IApproval No..-'-~, ~ , Plug integrity__ BOP Test ~ Location Clearance Mechar~al Integrity Test__ " Subsequent form required 10- t~O ~'~ / Approved by order of the Commission ~. J~. ~~ Commissioner Date , Form 10-403 Rev. 06/15/88 Si , ~ Triplicate Cross Timbers (' ;rating Company Prepared by: irs 5/21/99 Checked by: MGS A34-14RDII WIW Cook Inlet, Alaska Leg 1, Conductor 5 APl No.: Spud: Jan 1966 P&A Orig WB 10/75 P&A ST 12~75 Spud ST 6~76 CTI 7~79 Surf Csg: 13 3/8", 61 lb, J55. Set @ 0-1565'. Cmt'd w/800 sx. Intermed Csg: 9 5/8", 40 lb, N80 BTC. Set @ 0-5638'. Cmt'd w/ 700 sx. KB: ' Water Depth: Tubing: 3 1/2", 9.3#, N80 EUE 8rd @ 0- 11838'. 11/1982 Otis "X" Nipple @ 296' Camco Mandrel @ 10830' MD (8010' TVD) (Dummy) Guiberson Uni-Packer VII @ 10899' MD (8062' TVD) Camco Mandrel @ 11059' MD (8186' TVD) (Dummy) Guiberson Uni-Packer VII @ 11158' MD (8264' TVD) Guiberson Uni-Packer VII @ 11532' MD (8568' TVD) Camco Mandrel @ 11659' MD (8673' TVD) (Dummy) Guiberson Uni-Packer VII @ 11787' MD (8778' TVD) Otis "X" Nipple @ 11806' MD (8794' TVD) Guiberson Shear Sub (EOT) @ 11838' MD (8820' TVD) Prod Csg: 7" 29 lb N80 @ 0-66'. 26 lb., S95 New @ 66-6667'. N80 Used X-Line @ 6667'-12100'. Cmt w/845 sx. HC-HD: 11049'-11110' HE-HF: 11210' HK-HN: HN-HR: 11574'-11576' 11700'-11740' PBTD: 12010' TD: 12100' HR-HZ: HR-HZ: 11806'-11872' 11890'-11940' XTO Energy, Inc. MGS A34-14RD P&A Procedure Use slickline to pull the dummy valve from the GLM at 8,010', leaving the pocket empty. Move rig over well. Kill well as follows (tubing may have one or more holes in it at unknown depth(s)): With the annulus shut in, bullhead 9.0 ppg water-base mud down tubing to perfs. Then, switch over to the tubing x 7" annulus and, with the tubing shut in at the surface, bullhead one annulus volume of 9.0 ppg water-base mud to the peris. Install BPV, N/D tree, N/U BOPE. Test BOPE to 5,000 psi. [Note: at the discretion of the Drilling Supervisor and AOGCC Inspector (if present), blind rams will be tested after tubing is pulled from hole if there is a chance a gas bubble will settle under BPV, making it difficult or dangerous to release.] Pull BPV. RIH with a jet cutter and cut 3-1/2" tubing at 10,850' (between the GLM at 10,830' and the topmost packer at 10,899'). M/U landing joint to tubing hanger, back out lock-down screws and pull hanger to drill floor. Circulate until returns are clean and uniform. Ensure well is dead and POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry and send to shore. P/U a 7" cement retainer on 3-1/2" drill pipe, RIH and set the retainer at 10,900' MD (149' above the topmost perforation). Establish injection into the perforations. Mix and pump sufficient cement to extend from at least 100' below the lowermost perforation to the retainer. POH and proceed with sidetrack procedure to drill A23-01LW. January 30, 2001 Ms. Julie Heusser, Commissioner Alaska Oil and Gas Conservation Commission 333 West 7~ Ave., Suite 100 Anchorage, Alaska 99501 Request for Variance BOP Arrangement Dear Commissioner Heusser, Cross Timbers Operating Company requests a variance from 20AAC25.035(e): Blowout Prevention Equipment and Diverter Requirements for its workover and drilling operations on Platforms A and C in Cook Inlet. This variance is being requested per 20AAC25.035(h). Request Cross Timbers requests authorization to utilize a BOP stack that consists of an annular preventer, one blind ram and one variable bore ram in lieu of the annular preventer and three rams required in the AOGCC's regulations. The approved BOP arrangement currently on file with the Commission is for a 5,000 psi WP annular preventer, one set of 5,000 psi WP blind rams and 2 each sets of 5,000 psi WP pipe rams. The requested stack arrangement would contain a 5,000 psi WP annular preventer, one set of 5,000 psi WP blind rams and one set of 5,000 psi WP variable-bore rams. The proposed BOP components and arrangement provide an equally effective means of well control as the currently permitted arrangement. Rationale This variance is being requested because the lack of vertical space in the rigs' subbases on these small platforms do not permit the installation of a 3-ram stack. Only a two-ram stack is short enough to fit. Background Cross Timbers began planning to work over wells on Platform C and re-drill others on Platform A shortly after the platforms' purchase from Shell Oil Company in October 1998. Rig work was permitted and commenced in the summer of 2000. The BOP stack arrangement that was submitted to the Commission and approved prior to the start of work was a standard 3-ram stack. Upon attempting to install the stack under the rig on Platform C, it was found to be too tall to fit. The Commission was contacted and it was verbally agreed that a 2-ram stack could be used as long as one ram was a blind ram and the other was a pipe ram that always had rams fitted to the pipe being run into and out of 21 0 Park Avenue, Suite 2350, Oklahoma City, Oklahoma 73102-5605 (405) 232-4011 Fax (405) 232-5538 Ms. Julie Heusser 1/31/01 Page 2 the hole. This worked well as no tapered strings Were used during the workovers on Platform C. When the workovers were finished, operations and equipment, including the BOP stack, were moved to Platform A to commence the drilling program there. The same BOP arrangement was used since the same headspace constraints apply as on Platform C and there were initially no tapered strings used. However, on the current well a tapered drilling string is necessary and Commission representatives pointed out that the stack no longer meets requirements. We made inquiries as to how Shell operated when they last drilled on this platform in the mid-90's and found that they used a single set of variable- bore rams in lieu of 2 single pipe rams. Cross Timbers has now installed variable-bore rams with the verbal concurrence of the Commission, but a formal review and approval of this BOP arrangement by the Commission is necessary. Also, we would like to have the new stack arrangement diagram placed on file with the Commission, to replace the one currently on file. Please find enclosed a new BOP diagram, which, if approved, should replace the diagram currently on file with the Commission. If you have any questions or require additional information, please contact me at (405) 319-3213 or Bill Penrose at (907) 258-3446. Sincerely, CROSS T/MBERS OPERATING COMPANY Susan I. Sudduth Sr. Engineering Technician Mid-Continent Division enclosure CC: Bill Penrose Doug Marshall Doug Schultze CROSS TIMBERS OIL COMt'ANY BOP COMPONENTS M/DDLE GROUND SHOAL FIELD PLATFORMS "A" AND "C" · 0 ' ~ KILL LINE" ~.", 5 00~PSI WP MANUAL GATE 'VALVE' / ~,:, ~ooo,~I w? ~,,~ ~^~ v,~v~. ' 5000 PSI WP RISER :X 11'; 5000 PSI WP i'/ ........ 13-5/8", 5000 PSI WP HYDR/L GK ANNULAR PREVENTER W/ COMPANION FLANGE TO BELL NIPPLE BLIND RAIVIS ON TOP ~ ~c.~2-7/8" X 5" VARIABLE BORE RAMS ON BOTTOM 5000 PSI WP GATE VALVE W/ . HYDRAULIC ACTUATOR . ,~_~,,, ~ooo ~s~ w~ ~~o s~oo~ w~ ~o~,,,~ooo~w~o~~ C -oss' Timbers Operating Company t ? o-b o ' November 19. t999 Alaska Oil & Gas Conservation Commission ATTN: Blair Wmldzell 3001 Porcupine IL)rive Anchorage, AK 99501 Blair: SUBJECT: APPLICATION FOR SUNDRY APPROVAL (FORM 10-403) TO CONTINUE INJECTION OPERATIONS ON A34-14RDII Enclosed in t~ ;l,licate is the ~_n_ ~_Jication For Stmdrv Approva} to continue injection operations on Middle Ground Shoal (MGS) well no. A34-14RDI1. Cross Timbers Production Superintendent, Doug Marshall, notified the AOGCC of pressure communication observation berween the injection tubing and casing via telephone conversation with you on 10/28/1999. Pressure communication was observed and confirmed via annulus pressure observations. Injection rate and pressure have been monitored closely since identification of the problem and have not indicated a problem with casing integrity. A summary of the daily injection from 07/01/1999 to 11/11t/1999 is attached. Also attached is the monthly injection, history for the same period - note mechanical integrity, was last verified by MIT on 01/12/1999. Note that the injection rate and pressure has remained constant indicating that injection is being contained with the target in?.rval. Cross Timbers will continue to monitor injection rate and pressure on a daily basis and injection operations will be shut down immediately if the injeetivity increases significantly for unexplained reasons. Necessary data for monitoring the injectivity is reported monthly on AOGCC form 10- 406. Additionally, daily injectivity data is submitted to you, in compliance with AOGCC letter dated 11/06/1972. Based upon the above information, we request approval to continue injection operations on A34- 14RDII by way of Administrative Relief provided by Rule 9 of Area Injection Order (AIO) No. 9.5 (dated 10/21 / 1991 ), for a variance to Rule 6(b). Mechanical integrity of the casing will be monitored and demonstrated on a daily basis via injectivity indications. Please notify us of approval or any required action to continue injection operations. If you have any questions or wish to discuss further, please call me at (907) 776-2511. Sincerely, W. A. Miller Office Manager Attachments HO01 Box 485, Old Wik Road, Kenai. AK 99611-9704 Onshore phone: (907) 776-2§11, Onshore fax; (907) 776-2542 P'atform A fax: (907) 776-2522, Platform C fax: {907) 776-2532. www.crosstimbers.~'om ID= STATE OF ALASKA ALASKA OIL AND GASCONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS P03/13 1, Type of Request: Abandon .... Suspend ~ Operation shutdowll ~ Re-enter suspended well __ After casing . Repair well ~ Plugging Time exte~ion Stimulate Chanp~ approved program ~ Pull tubing ~ Variance X Perforate, Other 2, Name of Operate[ Cross.,T. jmbers ~p, era.!: lng Company . 3. Address 52260 Shell Road Kenai AK 99611-9704 5, Type of Well: Development Exploratory Stmt~raRhic ~ervloe 4, Location of well at ¢~ ff~oe Leg 1, tend. 5~J.621'FSL & 435'FEL from SE cnr of Sec. l:1,TaN,R13w. SM At top of productive i ,terval 11409'MDt~4895'F'NL& 2135'FEL of NE cnr of Sec, 14, T8N, R13W. SM At effective depth At total depth 12100'~194'FNL & 2322'FEL of NE cnr of Sec. 23, TSN, RI3W, SM Datum elevation (DF or KB) 116' KB feet ?, Unit or Properb/name Middle Ground Shoal 8, Well number A34-14RDltl 9.~Permit numbly__ 10, APl number 5o- 10086- 11. Field/Pool MGS "E", "F" & "6" Pools Present well condition Total depth: tr,~ vertical Effective depth: r,~;'~ured tr,,~ vertical 12100 feet Plugs (measured) 9035 feet 12010 feet Junk (measured) 896:1 feet Casing !. ength Structural Conductor Surface 156ri' intermediate Production 563..8' Liner 12100' Perforation depth: Size Cemented 13- 3/8", 61~, J- 55 800sx 9-5/8",40#,N-80 BTC 700sx 7", 26&2o~f, N- 80 845 sx measured 11049' - 11940' 6 intervals true verdi 8Z78' 8904' Measured depth 1565' 5638' 12100' True vertical depth Tubing (size, grade, and measured depth) 3-i/2" 73~, N-80 Buttress e 8949' Packers and S$SV (~¢~ and measured depth) Unipacke~~ VI! @ :10899', 11~58', ~1532', & i1787' ORIGINAL 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: October 25, 1999 1~, If proposal was verbally approved Oil Gas SUspended __ ...~.a..m._e.._O.~_._a.P~._rs_ver __~B1 air Wondzel 1 Date approved 10/27/99 Service ..... .Water ! n jeerer 1 ?. I hereby ce~lfy that thc fore~{ng is true,and correct to the best of my knowledge. Signed I~~~ (J~ Tit[e Ofr'Jc:e Ha.agar - - ~_7-__~- FOR ¢OUmJ'$~Ol( LJ~'0-I~LY Conditions of approval: Hotify Commission so representative may witness Plug integrity' .... [BOP Test ~ Location clearance · Mechanical tntegri~ Test ~ Subsequ. ent form required 10-_ ORIGINAL SIGNED' BY Approved by order of the Oemmission Robert N. Christenson Commissioner Form 10-40~ Rev 0G/15/8~ 11/19/1999 [Approval ..;~amission BAKKELS INJECTED A34-14RDII INJECTION PRESSURE ANNULUS PRESSURE 07/01/1999 07/02/1999 07/03/1999 07/04/1999 07/05/1999 07/06/1999 07/07/1999 07/08/I999 07/09/1999 07/10/1999 07/11/1999 07/12/1.999 07/13/1999 07/14/1999 07/15/1999 07/16/1999 07/17/1999 07/18/1999 07/19/1999 07/20/1999 07/2,1/I999 07/22/1999 07/23/1999 07/24/1999 07/25/1999 07/26/1999 07/27/1999 07/28/1999 07/29/1999 07/30/1999 07/31 / 1999 587 71,0 687. 662 67I 676 673 7O3 727 727 733 726 731 726 724 719 837 828 826 826 827 822 826 815 835 830 830 813 807 747 780 23431 756 3600 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 3650 July1999I~ection Ju~ 1999 Average DailyI~eetion 140 130 135 140 I45 140 150 150 150 155 155 155 155 155 155 150 150 150 150 150 150 165 165 165 165 165 165 170 170 160 150 RECEIVED 1999 AImlm & Gas Oons. Comn-,imbn 11-19-99 10:33 ID= P05/13 BARRELS INJECTED A34-14RDII INJECTION PRES SURE ANNULUS PRESSURE 08/01/1999 08/02/1999 08/03/1999 08/04/1999 08/05/1999 08/06/1999 08/07/I 999 08/08/1999 08/09/1999 08/10/1999 08/11/1999 08/12/1999 08/13/1,999 08/14/1999 08/15/1999 08/16/1999 08/17/1999 08/18/1999 08/19/1999 08/20/1999 08/21/t 999 08/22/1999 08/23/1999 08/24/1999 08/25/1999 08/26/I999 08/27/1999 08/28/1999 08/29/1999 08/30/1999 08/31/1999 788 775 773 780 786 783 786 786 787 787 784 790 788 785 784 782 779 786 782 778 789 780 783 782 784 795 787 739 725 817 800 24250 782 3650 3650 3650 3650 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 36O0 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3500 3650 3650 August 1999 Injection Augx~st 1999 Average Daily Injection 150 150 150 160 160 160 160 i55 150 155 150 140 140 140 140 140 150 160 160 160 155 155 I50 150 140 140 140 150 130 130 RECEIVED 1999 Ala~ 011 & Gas Cons. (.;oa~ 113= BARRELS INJECTED A34-14RDII INJECTION PRESSURE ANNULUS PRESSURE 09/01/1999 09/02/1999 09/03/1999 09/04/1999 09/05/1999 09/06/1999 09/07/1999 09/08/I999 09/09/1999 09/10/1999 09/11/1999 09/12/1999 09/13/1999 09/14/1999 09/15/1999 09/16/1999 09/17/1999 09/18/1999 09/19/1999 09/20/1999 09/21/1999 09/22/1999 09/23/1999 09/24/1999 09/25/1999 09/26/1999 09/27/1999 09/28/1999 09/29/1999 09/30/1999 787 803 799 755 763 759 694 I02 843 773 772 779 782 774 777 765 77O 774 767 774 762 776 775 400 0 0 464 926 923 884 20722 691 3650 130 3600 135 3600 128 3600 130 3600 125 3600 125 3600 125 2600 55 2600 100 3650 100 3650 110 3650 110 3650 110 3650 110 3650 110 3600 1.25 3600 130 3600 125 3600 120 3600 115 3600 115 3600 110 3600 100 3600 I00 2500 50 2400 50 3500 130 3550 100 3600 100 3600 110 September1999 I~ection September1999 Average Daily I~ection 10/01/1999 10/02/1999 10/03/1999 I0/04/I999 10/05/1999 10/06/1999 I0/07/1999 10/08/1999 10/09/1999 10/10/1999 10/11/1999 10/12/1999 10/13/1999 10/14/1999 10/15/1999 10/16/1999 10/17/1999 10/18/1999 10/19/1999 10/20/l 999 i0/21/1999 10/22/I 999 I0/23/I999 10/24/1999~ 10/25/1999 10/26/1999 10/27/I 999 10/28/1999 10/29/I999 10/30/1999 10/31/1999 BARRELS INJECTED 876 873 855 884 873 865 862 864 858 849 856 828 838 835 829 746 798 787 783 789 803 802 8O8 796 808 804 803 gl0 802 807 850 25641 827 A34-14RDII INJECTION PRESSURE ANNULUS PRESSURE 3600 3600 3600 3650 3650 3650 3650 3650 3600 3600 3600 3600 3600 3650 3650 3600 3650 3600 3600 3600 3600 3550 3600 3600 3550 3575 3575 3575 3600 3600 3575 October 1999 Injection October 1999 Average Daily Injection 105 I10 105 105 100 100 I00 90 90 90 9O 90 80 70 70 75 80 75 65 65 65 65 0 0 3600 3575 3575 3520 3520 3530 3575 RECEIVED 1999 11-,19-99 I0:34 ID= P08/13 BARRELS INJECTED A34-14RDII INJECTION PRESSURE ANNULUS PRESSURE 11/01/1999 11/02/1999 11/03/1999 11/04/1999 11/05/1999 11/06/1999 11/07/1999 11/08/1999 11/09/I 999 11/10/1999 11/11/1999 11/12/1999 11/13/1999 11/14/1999 11/15/1999 1 I/16/1999 I I/17/1999 11/18/1999 796 814 830 830 829 816 820 820 830 833 826 855 825 833 852 841 846 853 14949 83! 3500 3475 3600 3600 3550 36O0 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 YTD November1999I~ection November1999 Average DailyI~ection 'Cross Timbers operating company ID= November 1.9, ~ 999 Alaska Oil & Ga:.-.~ Consen, ation Commission ATTN: Blair WYndzell 300I POrcupine l)rive Anchorage, AK 99501 Blair: SUBJECT: APPLICATION FOR SUNDRY APPROVAL (FORM 10-403) TO CONTINUE INJECTION OPERATIONS ON A34-14RDII Enclosed in t, ;i!~,licate is the Ao~J!eation For Sundry_ Ao~r_ov_a! to continue injection operations on Middle Grounrl Shoal (MGS) well no. A34-14RDII. Cross Timbers Production Superintendent, Doug Marshall, notified the AOGCC of pressure communication observation between the injection tubing and easing via telephone com,ersation with you on 10/28/1999. Pressure communication was observed and confirmed via annulus pressure observations. Injection raze and pressure have been monitored closely since identification of the problem and have not indicated a problem with casing integrity, A summary of the daily injection from 07/01/1999 to ! 1/18/1999 is attached. Also attached is the monthly injectiot~, history for the same period - note mechanical integrity was last verified by' MIT on 01/1:2/1999. Note that the injection rate and pressure has remained constant indicating that injection is being contained with the target Cross Timbers will continue to monitor injection rate and pressure on a daily basis and injection operations will be shut down immedialely ffthe injectivity increases significantly for unexplained reasons. Necessary data for monitoring the injectivity is reported monthly on AOGCC form 10- 406. Additionally, daily injectivity data is submitted to you, in compliance with AOGCC letter dated 11/06/1972. Based upon the above information, we request approval to continue injection operations on A34- laRDII by way of Administrative Relief provided by Rule 9 of Area Injection Order (AIO) No. 9,5 (dated 10/21/199I ), for a variance to Rule 6(b). Mechanical integrity of the casing will be monitored and demonstrated on a daily basis via injectivity indications. Please notify' us of approval or any required action to continue injection operations. If you have any questiom~ or wish to discuss further, please call me at (907) 776-2511. Sincerely, W. A. Miller Office Manager Attachments On~hom phone: (907) 776-2511, Onshore fax: (90~ 776-2542 P~orm A fax: (god ~6-2522, Platform C fax: (907) 776-253~ www. cm~timbers,~om RECEIVED ~a~ka 0it & ~as Anchorage July 1, 1991 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 Lc-' ,~ ~'~' , .. ~ ,-q ¢ Gentlemen: SUBJECT: SUBMISSION OF THE APPLICATION FOR SUNDRY APPROVAL FOR A VARIANCE ON MIDDLE GROUND SHOAL WELL NO. A34-14RD II Enclosed in triplicate is the application for sundry approval to receive a variance to continue injection operations on Well No. A34-14RD II. Our understanding is that the Commission wishes to further review our June 26, 1991 request for amendment to Area Injection Order No. 9, Rule 6. The request is to reduce the mechanical integrity test pressure requirement for MGS wells equipped with hydraulic set retrievable packers. For your information, enclosed are the results of an annular pressure test conducted on the subject well on June 29, 1991. The results indicate casing mechanical integrity at 1000 psi test pressure. We appreciate your consideration in this matter. If you have any questions, please call Ms. Susan Murnan at (907) 263-9614 or Mr. Paul Huckabee at (907) 263-9646. Very Truly Yours, W. F. Simpson Manager Regulatory Affairs Alaska Division WFS/slm Enclosures RECEIVED J U L - 1 1991 Alaska Oil & Gas Cons. CommiSSiOn Anchorage AOGCC\SUNDRY.DOC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS,~N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend__ Operation shutdown Re-enter suspended well Alter casing __ Repair Well Plugging __ Time extension Stimulate Change approved program __ Pull tubing Variance X Perforate __ Other 5. Type o! Well: 6. Datum elevation (DF or KB~ 2. Name of Operator Shell Western E&P Inc. Development 116' KB feet 3. Address 601 West 5th Avenue, Suite 800 Exploratory 7. Unit or Property name Anchorage, AK 99501 Stratigraphic __ Middle Ground Shoal Service X 8. Well number 4. Location of well at Platform "A", Leg 1, Conductor 5, L@ 1621' FSL and 435' FEL A34-14RD II surface from SE Corn. of Sec. 11, T8N, R13W 9. Permit number At top of productive @ 11,409'MD, 4895'FNL & 2135'FEL of NE Corn. of Sec. 14, T8N, 66-2/9-687 interval R13W 10. APl number At effective depth 50-733-10086-02 11. Field/Pool At total depth @12,100'MD, 194'FNL & 2322'FEL of NE Sec. 23, T8N, R13W MGS/E, F, and G Pools 12. Present well condition summary Total depth: measured 12,100 feet Plugs (measured) true vertical 9035 feet Effective depth: measured 12,010 feet Junk (measured) true vertical 8961 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor Surface 1565' 13-3/8", 61#, J-55 800sx 1565' Intermediate Production 5638' 9-5/8", 40#, N-80 BTC 700sx 5638' Liner 12,100' 7", 26 & 29#, N-80 845sx 12,100' Perforation depth: measured 11,049'- 11,940" 6 Intervals R E C E IV E D true vertical 8178'- 8904' d U L - 1 '~9°J1~ Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 Buttress @ 8,949' Alaska 0il & Gas Cons. Packers and SSSV (type and measured depth) Unipacker VII @ 10,899', 11,158', 11,532', 11,787' Anchorage , 13. Attachments De. scr. iption summary of proposal __ Detailed operations program BOP sketch ~echanical Integrity Tes~ Form X -- __ 14. Estimated date for commencing operation 07/01/91 15. Status of well classification as: Oil Gas Suspended 16. If proposal was verbally approved -- -- -- Service Injector Name of approver Date approved 17. I hereby certify that the foregoin, g is true and correct to the best of my knowledge Signed -,-.d_ ~ :, Title /,',.4,,-,~-:.~,~ ~ ~'<;,.~ :-A~-~~' /~F,,",t/:: Date / ' FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witnessIIAppr°val Nc.c/ Plug integrity__ BOP Test__ Location clearance__ - Mechanical Integrity Test__ Subsequent form required 10- ' /- ORIGINAL StGNEO BY LONNIE C, SMITH I J Approved by order of the Commission Approved CoPy Commissioner Date --J I i Iq/ Form 10-403 Rev 06/15/88 ~ SUBMIT IN TRIPLICATE 20 JU~C :M AK 2~)..kT2(cl RECEIVED dUL - 1 tB9t Alaska Oil & Gas Cons. Commission Anchorage '6 Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 June 21, 1991 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen- SUBJECT' SUBMISSION OF THE APPLICATION FOR SUNDRY APPROVAL TO PERFORM MECHANICAL INTEGRITY TEST LOG ON MIDDLE GROUND SHOAL WELL NO. A34-14RD II Enclosed in triplicate is the application for sundry approval to run a mechanical integrity test log on Well No. A34-14RD II. The estimated date for commencing sundry operations is June 25, 1991. If you have any questions, please call Ms. Susan Murnan at (907) 263-9614 or Mr. Paul Huckabee at (907) 263-9646. Very Truly Yours, W. F. Simpson Manager Regulatory Affairs Alaska Division WFS/slm Enclosures AOGCC~SUNDRY. DOC STATE OF ALASKA ALAoKA OIL AND GAS CONSERVATION COMMISb~ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend__ Alter casing Repair Well Change approved program __ Pull tubing 2. Name of Operator Shell Western E&P Inc. 3. Address 601 West 5th Avenue, Suite 800 Anchorage, AK 99501 Variance 5. Type ot Well: Development Exploratory Stratigraphic Service X 4. Location of well at surface At top of productive interval At effective depth At total depth Operation shutdown Re-enter suspended well Plugging __ Time extension__ Stimulate __- Perforate Other X 6. Datum elevation (DF or KB3 Platform "A", Leg 1, Conductor 5, L@ 1621' FSL and 435' FEL from SE Corn. of Sec. 11, T8N, R13W @ 11,409'MD, 4895'FNL & 2135'FEL of NE Corn. of Sec. 14, T8N, R13W @12,100'MD, 194'FNL & 2322'FEL of NE Sec. 23, T8N, R13W 116' KB feet 7. Unit or Property name Middle Ground Shoal 8. Well number A34-14RD II 9. Permit number 66-2/9-687 10. APl number 50-733-10086-02 11. Field/Pool MGS/E, F, and G Pools 12. Present well condition summary Total depth: measured true vertical 12,100 feet 9035 feet Effective depth' measured 12,010 feet true vertical 8961 feet Plugs (measured) Junk (measured) Casing Length Size Cemented Measured depth Structural Conductor Su trace 1565' 13-3/8", 61#, J-55 800sx 1565' Intermediate Production 5638' 9-5/8", 40#, N-80 BTC 700sx 5638' Liner 12,100' 7", 26 & 29#, N-80 845sx 12,100' True vertical depth Perforation depth: measured 11,049'- 11,940" 6 Intervals ¢,~,~ Tubing (size, grade, and measured depth) 3-1/2", 9.3¢, N-80 Buttress ~ 8,949' Packed and SSSV (type and measured depth) Unipacker VII ¢ 10,899', 11,158', 11,532', 1 13. Attachments Description summaw of proposal __ Detailed operations program ~ BO~ket~ 14. Estimated date for commencing operation 06/25/91 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ Title ,~/.r,.-/~¢~.~ /~.~-G ~ ,-,47~,¢Y p,P,~-,4,',.~- Date ,. FOR CO M,SS ON USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity.__ BOP Test__ Location clearance__ Mechanical Integrity T est~pCrUobvS~U~,~tpfcrm required 10-. ~o/¢ Returnee .. ,_~_ ..,~.. ./__ ORIGINAL SIGNED BY Approved by order of the Commission//'~'/'-' '-'//~ LONNIE C, S]~lo~missioner [Approval No.~//.., Date ~ f/.~/~j~ SUBMIT IN TRIPLICATE Form 10-403 Rev 06/15/88 MIDDLE GROUND SHOAL WELL No. A34-14RD2 MECHANICAL INTEGRITY LOGGING SURVEY OPERATION: OBJECTIVES'. Run Oxygen Activation Injection Tracer Survey. STATUS: 1) Check mechanical integrity of the wellbore above the top packer in compliance with Area Injection Order # 9. 2) Check mechanical integrity of isolation packers and dummy mandrels. Injecting 998 BWPD at 3500 psi (6/11/90). Tubing/Casing Annulus Pressure = 430 psi. MECHANICAL DETAILS: see attached equipment detail sheet. REFERENCE LOG: DIL/SP dated / /76. (Have requested print from log files in Houston.) Dresser Atlas GR/CCL dated 11/11/82. EOUIPMENT REQUIRED: 1) Slickline Unit to drift tubing to > 1.75". 2) ATLAS Electric Wireline Unit (EWLU) with the following tools: a) 5000 psi lubricator b) Gamma Ray (GR) c) Casing Collar Locator (CCL) d) Temperature (Temp) transducer e) HYDROLOG oxygen activation logging tool 3) Empty drum to catch fluid back-flow & grease from lubricator. ATTACHMENTS: 1) Completion Equipment Detail Sheet MGS ]%34-14RD2 Mechanical Integrity Logging Procedure RECOMMENDED PROCEDURE: 1. RU Slickline Unit. Drift tubing to > 1.75". (NOTE: Minimum restriction should be 2.75" at Otis "X" nipples at 296' MD and 11806' MD. The HYDROLOG tool assembly OD is 1-11/16".) Tag PBTD ('12010'). POOH. RD Slickline Unit. Report results on morning report to Engineering and Files. NOTE: For verification of Mechanical Integrity Testing, the AOGCC must be notified at least 24 hours prior to the survey. They may elect to witness the survey. NOTE: Before calling out the EWLU, be sure the well has not been shut-in within the last 48 hours and the injectivity is stabilized at a representative rate for this well. Stable and representative injectivity must be maintained throughout the survey. 2. Close swab (crown) valve. RU ATLAS Wireline with 5000 psi lubricator. RU 1-11/16" HYDROLOG tool/ Temperature/ GR/ CCL. Test lubricator to 3500 psi using 1" line from injection manifold. 3. With well injecting, open swab valve and RIH. If well was shut- in for any reason during rig-up, inject for a period of time equal to or greater than the shut-in time. Ensure well injectivity is stabilized at the rate & pressure indicated by recent well tests. 4. Log base (injecting) Temp/GR/CCL from 10000' to PBTD (~ 12010'). Correlate GR/CCL to reference DIL/SP log depths. 5. Perform and record stationary mechanical integrity tests via the oxygen activation method at the following station depths. At each station depth, the source must be activated at least three times. Stationary measurements of at least 3-5 minutes duration must be taken for each source activation. page 2 MGS ~34-14RD2 Mechanical Integrity Logging Procedure STATION No. STATION DESCRIPTION RECOM MAX MIN SOURCE SOURCE DETECT DEPTH DEPTH DEPTH Calibration of 02 activation tool in rat hole below bottom HR-HZ perf 11960 ' PBTD 11950 ' Tubing tail check between packer (8) and profile nipple (9) 11800t 11800' 11790' Between packers isolating HK-HN and HN-HR perfs - below HK-HN perfs and above GLM (7) 11600t 11650' 11590' Between packers isolating HE-HF perfs 11300' below HE-HF perfs & above packer (6) 11520' 11220' Between packers isolating HC-HD perfs 11140' below HC-HD perfs & above packer (5) 11150' 11120' Above top packer (3) & below GLM (2) 10870' 10890' 10820' Above top packer (3) & above GLM (2) 10810' 10820' 10800' · PU to 10000'. Shut in (SI) well injection (do not close master valve or swab valve on wireline). Wait a minimum of six hours but no longer than 8 hours. With well SI, log SI GR/CCL/Temp from 10000' to PBTD to observe temperature anomalies. 7. Return well to injection. POOH. Close swab valve. RD ATLAS Wireline. Install tree cap. 8. On 2"/100' an~ 5"/100' scales, present a composite overlay of the "injecting" and "shut-in" Temperature from 10000' to PBTD. Send blueline copies of log presentations as indicated on the distribution list dated April 9, 1990. RECOMMEND: W~k~p h: 263-9646 Hm Ph: (907) 344-5857 APPROVED: page 3 DATE: MGS A34-14RD2 Mechanical Integrity Logging Procedure ANCHORAGE. Manager Alaska Operations - R. G. Blackburn Division Drilling Engineer - V. E. Unger Production Foreman, Kenai - D. L. Marshall Platform "A" Operations Foreman - R. V. Hill/J. W. Landess Environmental Technician - S. S. Brown-Maunder Anchorage Engineering File Room - Category (6) HOUSTON WOODCREEK R. G. Lippincott - WCK 1140 S. M. Logan - WCK 1162 E. W. Kitchen - WCK 1136 ORIGINAL TO: Woodcreek File Room - WCK 4100 page 4 . 7 8 9 10 'COMPLETION EQUIPMENT DETAIL SHEET MGS A34-14RDII 3/12/87 NO. ITEM APPROXIMATE TVD. MD. PSI OR -- 1. OTIS "X" NIPPLE 2. CAMCO MANDREL 3. GUIBERSON UNI-PACKER VII 4. CAMCO MANDREL 5. GUIBERSON UNI-PACKER VII 6. GUIBERSON UNI-PACKER VII 7. CAMCO MANDREL 8. GUIBERSON UNI-PACKER VII g. OTIS "X" NIPPLE 10. GUIBERSON SHEAR SUB (E.O.T.) 296 296 8010 10830 DUMMY ~;"~10899 8186 11059 DUMMY 8264 11158 8568 11532 8673 11659 DUMMY 8778 11787 8794 11806 8820 11838 CASING 13 3/8", 61#, J-55 @ 0 - 1565' 9 5/8", 40#, N-80 BTC @ 0 -5638' 7" 29#, N-80 @ 0 - 66' 26#, S-95 NEW @ 66 - 6667' 29#, N-80 USED X-LINE @ 6667 - 12100' w/845 sx PBTD = 12,010' TD = 12,100' TUBING , ,,, 3 1/2", 9.3#, N-80 EUE 8RD @ 0 - 11838' PERFORATED ZONE GROSS INTERVAL HC-HD 11049-11110' HE-HF 11210' HK-HN 11574-11576' HN-HR 11700-11740' HR-HZ 11806-11872' HR-HZ 11890-11940' Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 June 11, 1990 Alaska Oil and Gas Conservation Commission ATTN' Elaine Johnson 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT' TRANSMITTAL OF REQUESTED INFORMATION REGARDING THE SWEPI OPERATED MIDDLE GROUND SHOAL FIELD Dear Ms. Johnson' In a recent telephone conversation you discussed with Ms. Susan Brown-Maunder information that would be helpful to you if we could provide it. Enclosed, for your convenience and use, are the following' 2 location surveys showing the location of Platform A 1 list of conductor/well locations (in relation to the SE corner of Sec. 11, T8N, R13W) for Platform A wells 1 location survey showing the location of Platform C 1 list of conductor/well locations (in relation to the SE corner of Sec. 23, T8N, R13W) for Platform C wells In addition you requested a revised copy of the Well Completion or Recompletion Report and Log (10-407) for the recently completed well C21-23. The well location at the top of the producing interval and the well location at total depth as been changed to reflect the actual surveyed location. If you have any further questions regarding these matters, please continue to contact Susan Brown-Maunder at (907) 263-9613. Very Truly/Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/vj Enclosures cc' Susan Elsenbast-AOGCC \LETTERS\AOGCC\061190. DOC RECEIVED dila~ka Oil & Gas Cons. Comml~JtOl~ Anchora~ MIDDLE GROUND SHOAL P1 atform "A" WELL/CONDUCTOR LOCATIONS Leg I - Center of Leg i @ 1627'N & 435'W from SE corner of Sec.11, T8N, R13W, S.M. A 12-01 1 A 11-01 2 A 43-11 3 A 34-11 4 A 34-14 RD 5 A 22-14 6 A 12A-01 7 A 13-01 8 1632 1632 1630 1625 1622 1622 1625 1630 N & 440'W N & 437'W from SE corner N & 432'W " " " N & 430'W " " " N & 430'W " " " N & 433'W '" " " N & 437'W " " " N & 440'W " " " I! II II Leg 2 - Center of Leg 2 @ 1681'N & 372'W from SE corner of Sec. 11, T8N, R13W, S.M. A 42-11 9 1685 A 44-02 10 1685 A 42-14 11 1683 A 41A- 11 12 1678 A 11-12 13 1675 A 11-13 RD 14 1675 A 31-14 15 1678 A 44-11 16 N & 374 N & 370 W N & 368 W N & 368W N&371W N&375W N & 378 W 1683 N & 378 W W from SE corner II II II II II II II II II II II !1 II II II II II II II II II Leg 3 - Center of Leg 3 @ 1620'N & 321'W from SE corner of Sec.11, T8N, R13W, S.M. Le9 4 - Center of Leg 4 @ 1566'N & 383'W from SE corner of Sec.11, T8N, R13W, S.M. A 33-11 25 1571 A 14-01 26 1571 A 12-12 ,~ 27 1568 A 24-01 28 1564 A 13-12 29 1561 A 33-14 30 1561 A 41-11 31 1559 A 23-01 32 N & 385 N & 381 W N & 378 W N& 378W N&381W N& 385W N & 388 W 1569 N & 388 W W from SE corner II II II I! II II II II II II II II II II II ~',k,~sl<a Oil & Gas Cons. commission Anchora~a ~ ADL 18754 . : e LIT. GO* 47' 44.80~ : STXTE O~O COORO. Z~ Z2 t3 .' . Z4 19 20 . 33 34 35 36 ~1 32 ~ [ :;. LOCATION OF ~tlas~a, ~ii & Gas Cons. t ~mmission P R 0 D U C I N 0 P L ,',T F O R M T 8 N S.M. , Anchora~ [ 5~ELL MIDOLE GROUND SHOAL ~ T 7N S.M., t , ; PLATFORM A 0 4009 BOO0 12000 APPLICATION BY SHELL OIL CO. . Ii T. 8 N., R.13 W., S.M. 3 £ I0 ADL II 14 I0 15 I I - -k 1_8 7_5.4 I I I 12 II LEG NO. I,,~" 14113 LEG NO. I LEG NO. 2 LEG NO. 5 LEG NO. 4 P L ,4NE X : 232,783 X = 232,846 Y = 2,q85,845 Y = 2,485,897 C 00FFDIN,~ TES X: 232,896 Y: 2~485,835 X: 2:52,833 Y: ~_,485,785 1627' N B 435'W FROM THE SE COR. OF SEC. II,TSN, RI3W, SM. PUBLIC L4ND 1681' N B $72' W FROM THE SE COR. OF SEC. II, T8N, RISW, SM. D ES CtFI P T I OIV 1620'N I~ 321' W FROM THE SE COR. OF SEC. II, TSN, RI3W, SM. 1566'N D 383'W FROM THE SE COR. OF SEC. II, TSN,RI3W, S.M. LAT.- G0°47'44.839'' LONG.-151° 29' 45. 112". GEODETIC CO0/?DIN,4 LAT.- 60°47'45.368'' LAT.- 60°47'4~.7G8'' LONG.-151°29' 43.942" LONG.-151°29' 42/899" LAT.- 60°q7'4~,.24~'' LONG.- 151029, 44.154" Shell Western E&P Inc. 601 West Fifth Avenue · Suite 810 ~,/~ .~:.: ~{..i Anchorage, Alaska 99501 January 17, 1990 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen: SUBJECT: CANCELLATION OF OUTSTANDING REPORT OF SUNDRY WELL OPERATIONS FOR MGS WELL NOS. A33-14, A12-12, A23-OIRD, A34-11, A34-14RDII, A44-11, A13-12RD AND C31-26 Enclosed are two copies of the Report of Sundry Well Operations for MGS well nos. A33-14, A12-12, A23-OIRD, A34-11, A34-14RD II, A44-11, A13-12RD and C31-26. These workovers were all cancelled and none of the work was performed. If you have any questions concerning these reports, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/raf Enclosures SBBL/aogcc.011790 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown m Stimulate __ Plugging ~ Perforate m Pull tubing __ Alter casing __ Repair well OtherL CANCELLED 2. Name of Operator 5. Type of Well: She11 Western E&P I nc, Development ~ Exploratory __ 3. Address 601 West Fifth AVenue, Suite 810 Stratigraphic Service Z Anchoraae- AK 99501 - - 4. Location of well at surface Platform "A", Leg 1, Conductor 5. Center of Leg 1 @ 1621'FNL and 435' FEL Sec. 11, TSN, R13W At top of productive interval At effective depth Attotal depth 6. Datum elevation (DF or KB) 116 ' K B feet 7. Unit or Property name Hidd]e Ground Shoal 8. Well number A3~.-!,.,RD! ! 9. Permit number/approval number 66-2 /9-687 10. APl number 50-- 733-10086-02 11. Field/Pool E, F & G Pools 12. Present well condition summary Total depth: measured 12,100 ' true vertical feet Plugs (measured) feet Effective depth: measured 12,010' true vertical feet Junk (measured) feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length 1565' 5638 ' 12100' measured 11,049'-11,940' 6 Intervals true vertical Tubing (size. grade, and measured depth) Size Cemented Measured depth 13-3/8", 61# J-55 1565' 9-5/8", 40#, N-80 BTC 5638' 7", 26&29#, S-95 & N-80 845sx 12100' 3-1/2" 9.3# N-80 Buttress (~8,949' , True vertical depth Packers and SSSV (type and measured depth) Unipacker VII ¢ 10,899', 11,158', 11,532', 11,787' 13. Stimulation or cement squeeze summary Intervals treated (measured) N/A Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil __ Gas __ Suspended __ Service INJECTOR 17. I hereby ce~ify7 the foregoing is true and correct to the best of my knowledge. Signed ~/¢~ J,t,~,'( ~ TitleDIVIS ION OPERAT IONS MGR' Form 10-404 Rev 06/15/88 Date 01/17/90 SUBMIT IN DUPLICATE ~,. Shell Western E(xP Inc. 601 West Fifth Avenue. Suite 810 ~ 6 I ~ -' Anchorage, Alaska 99501 August 8, 1989 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: TRANSMITTAL OF APPLICATIONS FOR SUNDRY' APPROVAL FOR MIDDLE GROUND SHOAl_ WELLS A12-12 A23-OIRD A33-14 A34-11 A34-14RDII AND A44-11. ' ' ' ' , Enclosed, in triplicate, are six Applications for Sundry Approval for Middle Ground Shoal wells. The workovers involve stimulating the wells with 15% HC1. The work is scheduled to begin as soon as approval is received from your office. If you have any questions regarding this matter, please contact Susan Brown-Maunder at (907) 263-9613. Very truly yours, ~'/io: W. F. Simpson Manager, Regulatory Affairs Alaska Division MLW/SBBM/dl Enclosures SBBJ/aogcc. 080889 UUUI¥11 I I1~ II~lrLl~.~/~l r STATE OF ALASKA ALASKA OIL AN D GAS CONSERVATION COM MISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate ~ Change approved program __ Pull tubing __ Variance __ Perforate __ Other __ 2. Name of Operator Shell Western E&P Inc. 3. Address 601 West Fifth Avenue, Suite 810 Anchorage, AK 99501 5. Type of Welt: Development Exploratory Stratigraphic Service 4. Location of well at surface Platform "A", Leg 1, Conductor 5. Center of Leg 1 ~ 1622'FNL and 435' FEL Sec. 11, T8N, R13W At top of productive interval At effective depth At total depth 6. Datum elevation (DF or KB) 116' DF 7. Unitor Property name Middle Ground Shoal Well number A34-14RD I I 9. Permit number 66-2 10. APl number 50-- 733-10086-02 11. Field/Pool E, F & G Pools feet 12. Present well condition summary Total depth: measured true vertical 12,100' feet Plugs(measured) feet Effective depth: measured 12,010' true vertical feet Junk (measured) feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 1565 ' 5638 ' 12,100 measured Length Size 13-3/8", 61# J-55 9-5/8", 40#, N-80 BTC 7" 26&29#, S-95 & N-80 11,049 ' -11,940 ' 6 intervals true vertical Cemented 845sx Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 EUE 8rd @ 11,838' Packers and SSSV (type and measured depth) Unipacker VII ~ 10,899', 11,158', 11,532', 11,787' Measured depth 1565' 5638' 12,100 True vertical depth 13. A~achments Description summary of proposal X Detailed operations program __ BOP sketch __ 14. Estimated date for commencing operation As soon as approval is received. 16. If proposal was verbally approved Oil __ Gas __ Name of approver Date approved Service injector 17. I hereby qertify tt-,/~the foregoing istrue and correct to the best of my knowledge. Signed ~t~ ~)~,~ ~ Title Divisions Operations Manager 15. Status of well classification as: Suspended__ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- Approved Copy Returned Original Signed By (~-/-~ Approved by order of the Commissio~ avl d W. Johnston Commissioner Date I Approval No. Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE C;RR I/~ f'iT41Rq'F PROGNOSIS MGS A34-14 RDII OPERATION' OBJECTIVE' COMPLETION EQUIPMENT' STATUS' ACID Pump acid into water injection well. Increase water injection rate from 850 to 900 BWPD. See attached completion equipment detail dated March 12, 1987. The current water injection rate is about 850-880 BWPD. On January 1, 1989, water injection rate was about 900 BWPD. REQUIREMENTS- 1,000 gallons of 15%HC1 w/Inhibitor. PROCEDURE- 1. Rig up D.S. pumping equipment and test all lines and equipment to 5,000 psi using filtered injection water. Test acid for strength by titration method, to be witnessed by SWEPI representative. 2. Pump 1,000 gallons of 15% HCl with inhibitor into well followed by filtered injection water. Place well back on injection. Surface pressure on well will be 3,500 psi while on injection. RD D.S. 3. Note any change in injection rate on Morning Report. RECOMMENDED' DATE. JUL 2 5 lg8g APPROVED' "~./x,,/, CO ~ DATE' HAVS/072589 May 5, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Shell Western E&P Inc. ~ I~ ? 601 West Fifth Avenue. Suite 810. ? ~ /~_-.~-_M]~liVl'--'-'-~~ ~ Anchorage, Alaska 99501 .J,~/ ' I.-_c_-.'aJ~J~qr--'---i-- ..... /' ,:~ ,~:-~' -A~.z~-.--r- ...... / ~ 9~?~?'.. ~ss'r~ ~"/ IS?A'r'~cH I .... Gentlemen: SUBJECT: AREA INJECTION ORDER NO. 9 (CENTRAL PORTION MIDDLE GROUND SttOAL FIELD), RULE 6 As part of the requirements of Area Injection Order (AID) No. 9, Rule 6, a schedule for performing radioactive tracer surveys (RTS) must be submitted to and approved by the commission. During conversations with members of your staff it was indicated that the Commission may accept recent RTS's even though the commission representatives did not have the opportunity to witness the surveys. By way of this letter, SWEPI is submitting our schedule for performing RTS's on in,iection wells and request that you accept the recent surveys as satisfying the requirements of Rule 6 based on the enclosed RTS logs. (See Attachment 1 for list of enclosed logs.) Attachment 2 is a table showing the mechanical integrity history for the MGS injection wells. Also shown is the proposed testing schedule noting those wells for which we are asking your acceptance of the previously run surveys. Your early review of this proposal would be greatly appreciated. If we can be of further assistance, please do not hesitate to call Ms. Susan Brown-Maunder at (907) 263-9613. Very truly yours, W. F. Simpson Manager Regulatory Affairs SBBM/hr Enclosures GTK1/050489 Attachment 1 lIST OF ENCLOSED LOGS Well No. ~' AIl-12 ~, All-13 RD II ~ A12-12 u A33-14 ~'A34-14 RD II / A44-11 ' C23-26 ~ C24-23 v C34-23 V' w C41-23 Log(s) RAT - 6/I7/87 NFL - 1/17/86 NTL - 3/4/88 NFL - 3/5/88 RAT - 6/17/87 NFL - 9/5/86 RTS - 3/26/88 NFL - 1/26/87 NFL - 2/12/87 NFL - 1/27/87 NFL. 2/10/87 NFL - 2/12/87 NFL - 10/24/87 GTK1/050489 TELEC©PY NO: (907) 276-7542 September 11, 1987 Mr. M. L. Woodson Shell Western E & P 601 W. 5th Avenue, Suite 810 Anchorage, AlaSka 99501 RE: API number, MGS well A-34-14 RD2 Dear Mr. Woodson: It has recently come to our attention that subject well has an AP1 number of 50-733-10086-01 which identifies it as redrill number 1 of MGS Well A-34-14. Since the current wellbore is redrill number 2, the AP1 number should be 50-733-10086-02. Please change the API number of A 34-14 RD2 to 50-733-10086-02. Thank you. Sincerely, W. W. Barnwe Commissioner dlf: 1.BEW. 2 SCHLUMBERGER OFFSHORE SERVICES A Division of Schlumberger Limited HOUSTON. TEXAS 77001 August 31, 1987 Shell Western E&P, Inc. 601W. Fifth Avenue, Suite 810 Anchorame,.AK 99501 -- Affention: Mr. Joe Fram Pi,.n'Ae[ R[PLY TO Kenai, AK 9961! Attention: Shelley Ramsey Gentlemen: Enclosed ore2 BL printsofthe Production Log Compony SWEPI ,Well Middle Ground Shoal "A" #34-14 RD2 Field. Middle Ground Shoal ,Coun~ Kenai qtote Alaska on: , Additionolprintsore being sentto: 1BL printm original film Shell Western E&P, Inc. P. O. Box 527 Houston~ TX 77001 Attn: Log Files, WCK 4147 I BL prints, 1 Reverse Folded Sepia v 'State pf Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Attn: H. W. Kugler 1 BL prints Shell Western.~E&P, Inc P. O. Box 52'7 Houston~ TX 77001 Attn: R. J. Valle~o, WCK 1134 1BL prints Shell Platform "A" c/o Shell Kenai Office North Star Route #1 P. O. Box 485 Wik Road Kenai, AK 99611 1BL prints, 1 Mylar ARCO Alaska~ Inc. P. O. Box 100360 Anchorage, AK 99501 Attn: H. F. Blacker prints 2 BL print~ 2 Reverse Rolled Sepia Chevron U.S.A., Inc. P. O. Box 5043 San Ramon, CA 94583-0943 The film is returned to Shell, Houston. We oppreciote the privilege of serving you. · · . . · . . .. prints PLEASE SIGN & RETURN ONE COPY OF THIS TRANSMITTAL. RECEIV DATE: Very truly yours, SCHLUMBERGER OFFSHORE SERVICES Marc A. Gunther DISTRICT MANAGER Shell Western E&P Inc. A Subsidiary of Shell Oil Company 200 N. Dairy Ashford P.O. Box 527 Houston, TX 77079 May 2, 1984 Alaska Oil & Gas Conservation Commission ATTN Mr. C. V. Chatterton 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen' Enclosed for your information are Subsequent Report Sundry Notices for work on the following wells' Seal Island OCS Y-181 Middle Ground Shoal Al1-12 Middle Ground Shoal A34-14RD2. Yours very truly, R. G. Hollis Division Production Administration Manager Pacific Frontier Division RGH'bjh Enclosures RECEIVED MAY 0 7 1984 Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~X Injector 2. Name of Operator Shell Nestern E&P, Inc. 3. Address ATTN: Production Superintendent 601 West 5th St., #810, Anchorage, AK 99501 4. Location of Well Conductor 5, Leg I @ 5.31' S & 1.72' E from Center Leg @ 1622' RNL and 435' FEL, Sec. 11, T8N, R13W. OTHER [] 8. APl Number7'~ /"~/2'~' 50- 733-10086-01 9. Unit or Lease Name MGS 10. Well Number A 34-14RD2 11. Field and Pool MIDDLE GROUND SHOAL E,'F & G Pools 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 116' D.F.t ADL 18756 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). INJECTION PROFILE SURVEY 4/5/84 Rigged up Dresser Atlas Ran spinner flowmeter and RA Tracer survey across perforated interval. Rigged down. RECEIVED MAY o 7 1984 Alaska 0ii & Gas Cons. Commission Anchorage 14. t hereby cer~fy that t.,h/e foregoing is true and correct to the best of my knowledge. Signed i ~ ~--'~/~~~'' , , ,' Title Div, Prod. Adm Mgr The space below for Commission use Date 4/24/84 Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate RE RETAIN THIS SECTION FOR YOUR RECO ~(~sa~,~i~tla, A 11 - 12 (BOTH ARE PLS'S SHELL) PLS'S 1 PRINTS 0 NEG. 1 SEPIA PRINTS NEG. SEPIA ! PRINTS NEG, SEPIA ~ PRINTS NEG. SEPIA :! ' AB©VEREOEIVEDFROM: DRESSER AT --A~TT.: Ho U..-K-U ~ L~ ~ MAY 2 9 ]984 ~~~~~I~-~ ~E)i, ~, 6as Cons. Sgommls$1o. Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CL~MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WE LI_X~ Injector OTHER [] 2. Name of Operator Shel] 0il Company 3. Address dohn Douglas, P,O. Box 4500, Kenai, AK 99611 4. Location of Well Conductor 5, Leg I @ 5.31' S & 1.72" E from Center Leg @ 1622' RNL and 435'~ FEL, Sec. 11, T8N, R13W. 6. Lease Designation and Serial No. ADL 18756 5. Elevation in feet (indicate KB, DF, etc.) 116' D.F. 12. 7. Permit No. 8. APl Number 50- 733-10086-01 9. Unit or Lease Name HGS 10. Well Number A 34-14RD2 11. Field and Pool MIDDLE GROUND SHOAL E, F & G Pools Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other ~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). See Attached 14. I hereby certify that tl~e foregoing is true and correct to the best of my knowledge. The space belo~ for Commission use Date 10/4/83 Conditions of Approval, if any: 8Y LOHHIE C. Shll'i'll ~,,, Order of Approved by COMMISSIONER the Commission ,~.pproved Copy Returned~ .-, Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate AUTHORITY FOR EXPENDITUf-'~ or=m'.-la~ o~=~=lC~'10~IGI-,~'nNG oP;,c~ ~F.~ ~ .-. PRODU~IONI PACIFIC DIVISIONI HOU~ON L~~ OF ~~ ~~IA~ A34-14 Rd2 Platform A HJdd]e Ground Shoal' Field 9/22/83 Cook Inlet, Alaska ORDER ~PE DESCRIPTION R&R 0brain Profile In3ection $]5,000 $5,000 55,000 Suave3 in well A34-]4 Rd2 Non Operators Approval Not Requi red Requested by' J. H. Doug]as T. 5. Burns , . · u.-~o,,~ $]5,000 $5,000 $5,000 BUDGe' AVAILABLE IN BUDGET RETIREMENT POSITION r NEW CAPITAL FUNOS REQUIRED BY 8UOGET REVISION TOTAL COST ~ ~ 000 m,, , i-,, JUSTIFICATION: ...... 5ce attached , · ~ONTINUED OV~ ...... RECOMMENDED APPROVALS Justification Injection Survey A34-14 Rd2 Middle Ground Shoal Field Funds totalling $15,000 ($5,000 Shell's 1/3 share) are requested to obtain an injection survey in well A34-14 Rd2, Platform "A", Middle Ground Shoal Field, Kenai, Alaska. Well A34-14 Rd2 was drilled in August 1971 and converted to injection in July 1979. The .initial injection rate was 4000+ BDW. An injection survey run in July 1980 showed that 63% of the water was going into the HN/HR(U) thief zone. In October 1982, the well was pulled and the HN/HR(U) zone was isolated. The initial injection rate after the job was 750 BDW. It appeared that the job was successful. Since October 1982, the injection rate has increased from 750 BDW to 950 BDW. An injection survey is necessary at this time to determine if total isolation of the HN/HR(U) zone was achieved or whether communication behind pipe is occurring. Prior to the survey, the HC/HD will be opened by removing the dummy valve from mandrel #4. This should supply additional pressure maintenance to C44-14 Rd. The HC/HD will be closed if unfavorable vertical flow is detected behind pipe in this area. Your approval is recommended. TSB:mh Prognosis Injection Profile Survey A34-14 Rd 2 Status' Injection 950 BDW at 3500 psi. See attached completion details for perforations, sliding sleeves, packers, gas lift mandrel depths, etc. Objective' Open HC/HD to injection and determine injection profile. Procedure' · Rig up wireline and lubricator. Test lubricator to 3500 psi. Make drift run to bottom. Record on log heading. Run in and pull dummy mandrel from mandrel #4 at 11,059'. Rig down wireline. e Maintain constant injection rate of 3500 psi pressure for 3 days prior to and during the survey. Record on log heading. e Rig up service company's lubricator (high pressure - wireline), stuffing box, collar locator, continuous flow meter, and radioactive tracer with ejector and two radioactive detectors. e Tie into depths wi th collar locator in casing. Log perforated interval (11049'-11918') with CFM and determine profile for water leaving tubing or casing. 5~ Use R.A.T. to determine profile behind tubing and vertical fluid movement behind casing. · Log tubing to surface with CFM to determine tubing leaks and/or fluid leaving tubing and re-entering at a lower location. If casing leaks are suspected, confirm and locate using R.A.T. 7. Rig down service company, continue injection Date tc~ --~, - ~ A34-14 RD I! Recol-~lpleLed 11/11/82 38' ITEM NO. DESCRIPTION 1. Otis X.-Nit)ple 2. O~mco KI3M Mandrel 3. Guiberson UniPacker VII 4. C~:~?~co KBM Mandrel 5. gu'iberson Uni?acker VII 6. Guiberson UniPacker VII 7. Camco K.[~M Mandrel 8. Guiberson UniPakcer VII 9. Otis X~Nipple 10. Guiberson Shear Sub (EOT) DI£ P'I'$~: 29Fi 10,830 10~89'~ 11 ~059 'l 1.,158 I 1,532 'Il ,659 ll ,787 11,806 11,838 M ! .~ C. 2.7 5 0" 2.9:J2" I.D. 2.992" I.D. 2. 992" I.D. 2. 992" I.D. 2.750" I.D. 2. 992" I.D. I'UBING DETAIL 0 - 18 838 ~ N" 9 3# N-80 EUE 8Fd CASING DETAIL. 0-1565 0-5638 0-7000 0-12000 13-3/8" 61# J-55 9-5/8" 40# N-80 BTC 7" 26# S--95 New 7" 29# N-80 Used X-Line HC/HD HK PERFORATIONS HC/HD - ll020 (Unable to squeeze) 11049-11075 - Open- Il089-11100 (Squeezed) HK ll210 (Squeezed) 1157~-11576 (Squeezed/No test) HN/HR 11600-11760 HR/HZ. 11806-11940 REPERFORATIONS HN/HR HC/HD 11060-11075 HC/HD I 1049-11 t O0'N. liN/HR ll700-11740 F- HR/HZ 11890-11918 J 11/82, 4 JPF 12J© 4"c.g. HR/HZ ~ PBTD 12,010 · I ' . ~ / O, : A~. -- , u ~'~ / : ,~ / I ~ ~-,, : , / ,,, ~?, ~ : , IF,,,J~C ~ION W LL . , /~ . ~ ~,~, ; ~ P.~ ..................... L ....... ' , ~:,,~ 0 - '": i ,~,~-.g~"/ ; 0 4000 .... ~- ~'~ ABND. DRILLING WELL COMPLETED WE L LX~ Injector-. Jme of Operator' - __~ELL Oil COHPAHy 3. Addre~ Wayne Simpson, 601'H' 5th Ave., ~810, Anchorage, AK 99501; 4. L~at;on of We~ Conductor 5, Leg 1 0 5.31'S 1622' R~[ and 435' F[k Sec. 11, Elevation in feet [indicate KB, DF, etc.) D.F. 116' 12. OTHER 7. Permit No. .' 8. APl Number so- 733-10086-01 9. Unit or Lease Name · MGS 10. Well Number A34-14RD2 6. Lease Designation and Serial No. ADL 18756 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEOUENT REPORT OF: 11. Field and Pool HZDDLE GROUND SHOAL E, F & G Pools {Submit in Triplicate) Perforate r-I Alter Casing E] · Perforations Stimulale 0 Abandon Fl Stimulation Repair Well E] Change Plans [~ Repairs Made Puli Tubing ri Other [3 Pulling Tubing ;(Note: Report mutl~ple completions on Form 10-407 with a submitted Form 10-407 for each completion.) {Submit in Duplicate) Altering Casing D Abandonment F1 Other Describe Proposed or Completed Operations {Clearly state all pertinent details and give pertinent dates, including estimaled date of starting any proposed work. for Abandonment see 20 AAC 25.105-170). .. SEE ATTACHED. hereby certify that th~ foregoing is true and correct to the best of my knowledge. ~n~. 'ri,e. ?roduct~on ^dmin~ strat~on sDace below for Commission use Date 11/1'7/82 ~ditions of Approval° if any: . By Order of ~roved by COMMISSIONER the Commission Date ,,n 10-403 7.1-80 Submit "ln~ent~ons" in TriplJcale and "Subsequent Reports'" in Dupl,cale WrZLL F~ECOMPLETI'ON REP~)RT tuo~z ,.,4/,, N~. A34-14RD2 SHELL OIL COHPANY m.]~ M~D~LE GROUND SHOAL' 11/13/82 116' D.F. ~rker Horizons · __ Unchanged NONE 13 3/8-:.~=~ 61# J-55 c.-,..-:-~ "1565' -9 5/8.=.,,~ 40# N-80 BTC -.=.,~d , 5638' : 7 -~-~., 26# S-75 LT&C ,,=,~d -- 6700' _ 7 '::~ 29# H-80~,~'~q~=-, ,, 12100' _ · ___ _ ~. &. 0.~ {JPF w/q~ ' 11/OO/11 11049/1111O _ Produdion Data I nlttal Production Adctl. Prcd. __ llll C~Icul~led P~ntizl Pulled tubi. ng and packer.' Packer had to be fished out. Reperforated HC/HD, HK/HB(L), and HR/HZ zones. Reran tubinn with four isolation packers to mechanically isolate the HN/HR(U) thief zone. Jio.d _ \ \ ./ UIDDLE GROUND SHOAl_ _- A34-14RD2 --_ -- 'KENAI, AK 10/21/82 11/13/82 Sec. '11, T8N, R13W _ , ~ , ,,'-- ~ - - i iii i II m i · i I L I ~ ............. I i~ iir ! .... i i _ i_ · · STATUS_.-_ CURRENTLY CHOKED BACK.TO +500 BPD.' I~N/HR(u) WAS' TAKING 63% OF INJECTION WATER AS-OF LAST SURVEY (7/80). WELL. WAS PREVI'OUSLY CHOKED BACK FROM 3500 BPD TO +1500 BPD IN 8/81. PROPOSAL: PULL TUBING AND PACKER. REPERFORATE HC/HD, HK/HN(['), 'AND HR/HZ WITH CASING GUNS. RERUN ,TUBING WITH ISOLATIO~ PACKERS TO MECHANICALLY ISOLATE (WITHIN THE WELLBORE) THE HN/HR(U) THIEF ZONE. 10/21/82 MOVING RIG FROM LEG #2 TO LEG #1. SHUT DOWN RIG MOVE. WIND (25 to 40 MPH). PLATFORM FROM NORTH TO SOUTH.. RAN IN WITH NtR£L.t-NE TO NITH~.:~RItq'~ RAN IN WITH WIRELINE TOOLS VALVE:-.:AT-=-I 0 ;'698~.. T . ' O(~I,:.~~D~.~;;A]~].~OOO~_ CAME. BACK UP TO 6,648' TO PULL DUMMY. TOOLS-STUCK AND LOST JAR ACTION. ' DROPPED .CUll-ER AND CUT WIRE OFF AT ROPE 'SOCKET. LEFT TOOLS AND CUTTER BAR IN HOLE AT 6648'. RIGGED UP TO BACK FLOW WELL THROUGH TUBING CASING ANNULUS INTO PRODUCTION HEADER. WELL FLOWED 132 BBLS. OF 37 GRAVITY OIL WITH 0 WATER CUT BEFORE IT TURNED TO WATER. 10/22/82 STILL WAITING ON WIND TO LIE BEFORE SKIDDING RIG ANY FURTHER' .. ,. SERVICING RIG AND. DOING WHAT CAN BE DONE WITHOUT HAVING RIG OVER WELL. CONTINUING TO BACK FLOW WELL THROUGH TUBING CASING ANNULUS OVERBOARD. 10/23/82 STILL WAITING ON WIND TO LIE BEFORE SKIDDING RIG ANY FURTHER. WIND SPEEDS 25 TO 40 MPH ALL DAY. SERVICING RIG AND DOING WHAT CAN BE DONE WITHOUT HAVING RIG OVER WELL. CONTINUING TO BACK FLOW WELL OVERBOARD THROUGH TUBING CASING ANNULUS. · 10/24/82 WIND LET UP' ~t3VED::~RI~G:FROM..~LEG~2::.=TO.::LEG:~.~I,1. TURNED RIG · 180 , SKIDDED RIG OVER WELL. RIGGING UP. CONTINUING TO BACK FLOW WELL--OVERBOARD-THROUGH TUBING CASING ANNULUS.,- 10/25/82 PULLED ELECTRIC LEADS. GOT RIG MOTORS RUNNING. RIGGING UP ' LINES FOR RIG. OFF LOADED DRILLING EQUIPMENT THAT CAME FROM PLATFORM C. SET CAT ENGINE IN PLACE. SET PIPE RACKS IN PLACE. SET CAMERON BPV IN TUBING HANGER. NIPPLED DOWN XMAS TREE. S. TA~tNG?~RISER'..AN~~~AT REPORT TIME. 10/26/82 ~B~,E:'~P-~'-BOP~"S-FACt('=':&~RISER, HOOK UP FLOWLINE AND CHOKE AND KILL LINE. P. RE$$1JRE~T£~T-~STACt~.- STACKisEAt(-~B.~.-~LI~.~I;L~I~ J~)$N.T~, PLUS~I RAM CAGE. SEAL ON THE SHAFFER GATE,"~FI~I~~: ~IIDDLE qROUND SHOAl_ . ____KENAI, AK , 10/21/82 -- REPORT .. 11/13/82 · _,~ A34-14RD2 -- q~--,2~oa~ = - Sec..11, T8N, R13W 10/27/82 10/28/82 R ~A~-TA KSymI.~l,-~ ~,S.'~AGg. TEST INSTALL BPV & LANDING JOINT. REMOVE LOCK DOWN SCREWS. TO P~t~AC~. UNABLE TO MOVE, WORKED TUBING W/200,O00~ FOR 2 HOURS. PUP aT. ABOVE TUBING HANGER PARTED DROPPING HANGER ON TREE. PICKED UP TUBING TO CHECK ~. & ASSURE NOTHING PARTED. RIG UP W~[~~N~~U~;~,UBIN~. INSTALL FLOW HOSE ON TUBING '~6'~FLD~ WELL THROUGH TUBING IN ATTEMPT TO CLEAR SCALE OUT OF TUBING. RIG UP TO MAKE ANOTHER WIRELINE RUN ~ 0600. RAN~5~A.B~t~TO:~:4'5~8~ AFTER FL OWI'NG ~ATER FROM WELL THROUGH TUBI~NG. BIT B'~T ~Bg~IO~ 1N TUB I'NG AND, WOULD NOT GO DEEPER. POH-W/WI'RELI'NE AND R~G UP TO RETEST_ STACK AND RISER FOR STATE DEPT. OF O~L AND GAS, ~STED~O~3500.~.~P.S:~ RIG UP LI'NES TO TUBING BY 7" ANNULUS FROM I'NJECTION HEADER-AND RE-- VERSE TUBING WI'TH INJECTION WATER. RUN~~~,~BI~N ~UB~NG TO ~0~~ NO SIGN OF WIRELINE FISH THAT WAS AT +6600'. CHA~GE BIT~TO:~:L2:~5~8"~.GAUGE~-,]Rt'~BLAND RU~ BACK~:TO-.7.I35~e' POH TO RUN DIALOG TUBING CUTTER. TUBING CUTTER (2 5/8") WOULD NOT GO TO 7100'. ~UT-~TUBING,.~6835'~. CUTTER FIRED BUT NO EVIDENCE OF CUT WAS SEEN ON ~. INDICATOR W/lOO,OOOfl BEING HELD ON TUBING. SLOWLY PICKUP TUBING TO VERIFY CUT. TUBtNG::PAR~ED !~?~HOLE~/150~O00~ ~ CALCULATE~DE.P~TN.-:gE?+~32OO~:~, POH LAYING DOWN TUBING ~ 0600 HRS. 10/29/82 'LAY DOWN 3½" TUBING.~ RECOVERED~225~~3½~gBIN~YO CUT OFF ~~§'. PICK UP TR~-STATE FISHING TOOLS (HOLLOW MILL, OVER- SHOT JARS BUMPER SUB 6/4 3/4" DC'S - JAR ACCELERATORS - 3/4 3/4" DC'S 3½" D.P.) MILL OVER FLARED END OF TUBING AND CATCH ~/OVERSHOT. CIRC. SEAWATER THROUGH TUBING AND WORK JARS AND ': ATTEM~~,D_L~ACK~R. ~PPAREtt~NOVEMEN~I~:~.~A£~ER. RIG UP DI'A-LOG TO MAKE RUN INTO TUBING TO DETERMINE IF TUBING IS CLEAR AND IF 1T'"SPOSSIBLE~':TO RUN-TUBING-PUNCHER--OR STRING SHOT. RIGGING UP WIRELINE @ 0600, _.D~!DD~L..E GROU,~,~D SHOAl-. A34-14RD2 _ _ _'KE.(I, AI,,, AK 10/21/82 11/13/82, -_ Sec..11, TSN, R!3W _ i ii _i~ in i i i i i. ii i i ii i ii t i i~i I - ' i III I I II I I ii I · 10/30/82 RAN SPUDDING JARS AND ~/FS. TO 8455'_. TOOLS STOPPED, APPARENTLY ' SET DOWN ON MERLA KICK-OVER TOOLS OR CUTTER BAR. RAN 2" LATCH TOOL ATTEMPT TO RECOVER CUTTER BAR. ,~,~......~_~.~U~:.T,E.R BAR, HOWEVER WELDED LUGS ON SIDE OF CUTTER BAR WOULD NOT PASS THROUGH JARS. RAN BACK DOWN TUBING TO DETERMINE IF TUBING CLEAR OR KICKOVER TOOL STILL IN TUBING, DETERMINED THAT TUBING WAS CLEAR TO BOTTOM.' PULi_ BACK INTO JARS W/CUTTER BAR, UNABLE TO SHEAR OFF LATCH TOOL. PULLED OUT OF ROPE SOCKET AND POH W/WIRELINE. REHEAD LINE AND RAN SPUDDING JARS AND WTS. TO KNOCK CUTTER --- BAR~OUT_OF._JARS._."POH AND RAN STRING SHOT-COLLAR LOCATER FREE POINT TO BACKOFF TUBING. 'UNABLE TO GET FREE POINT-BELOW DRI'LL' COLLARS. POH RESET SPRINGS AND RAN BACK. TOOLS STICKY. POH RIGGED UP AND PUMPED DOWN TUBING· RERAN FREEPOINT GOT DOWN ' ON-SECOND-RUN ..... WORK ~fORQUE-.INTO -TUBING .AND MADE BACKOFF-~~ WT. , INDICATED THAT BACKOFF-MADE IN CORRECT PLACE. POH- @- 0600';-' .. -' 10/31/82 PON LAID DOWN TUBING· TUBING BACKED OFF IN WASHED OUT PIN 8757'. P~£COVERED-189~.?TUBING~ RIM W/OVERSHOT R]~H-W/.~.~2.;.3'/8,,"'OD'~i~(3~,L.~D~.~.CUT~T. EP~ EXPERIENCED Much DIFFICULTY GETTING TOOLS THROUGH~:D~P~'~'~~ 6800?~OUE~T~O-:'DOGLF~t3' AFTER GETTING SHOT INSIDE TUBING SHOT'~¥UBING-'::(a~'~1082~i'- COMING OUT W/DIALOG CUTTER TOOLS STUCK INSIDE OVERSHOT. UNABLE TO WORK' TOOLS EITHER UP OR DOWN. PULLED OUT OF ROPE SOCKET AND POH W/WIRELINE. PICKED UP TUBING AND TUBING PARTED W/260,000. POH W/D.P., LAID DOWN TUBING.._ DIALOG TOOLS WERE NOT IN JARS. POSSIBLY FELL ON TOP~F PACKER. THERE I'S 1,0.~OF'~i'RE'~E TOOLS - ABOVE TOP- OF TUB ING CUT.- RI GGED ~.~O~'-~/~i-~:WI'REL;INE~TOOLS' @ 0600 HRS. · 11/1/82 .... ~- OVEr-SHOT ON WIREL INE ANm~-~RE~Q.~'~-'~iREt~'IN~.~QL'gm,(-CUTTER - CENTRALIZERS ' 5 SINKER BARS - ROPE SOCH<ET) MADE UP HOLLOW MILL, OVERSHOT, JARS, BUMPER SUB, 6 -4 3/4" DRILL COLLARS, JAR · ACCELERATORS, 3 - 4 3/4" DRILL COLLARS. -RIH, PICKED UP. - ADDITIONAL D.P. CIRCULAT~E~).~K)WN~¥Ei~~TttBI'NG~IJBr~27~qBOwE''' KER APPEARED TO MOVE I OR 2 EEET. OVERSHOT SLIPPED OFF TUBING. POH TO CHANGE JARS, GRAPPLE, AND INSTALL OVERSHOT EXTENSION. RIFt~W~F~-S~I~I'~L~S @ 0600 HRS. .___~_!=I DDLE GROUND ~HOAt KFNAI, AK 11/2/82 11/3/82 11/4/82 10/21/82 RI~ORT 11./!3/82_. ! __ A34-14RD2 Sec. 11, TSN, R13W RIB ~.JHOL. LO.t~'M!;LL- 4' OVER. SHOT EXTE11.SIO~I. AND $~.HE FISHI11G TOOL ~'TR.[~G.- ~ JAR ~0_ -~A'C~K~R:'~R~:~:=HOI~R,S, 1/.0 SUCCESS'. RIGGED UP DI'ALOG AND RAN STRING SHOT AND SHOT IN PACKER IN ATTEMPT TO DI'SLODGE. jAR:~ON?~IpA~KE~'~t~-':~t-OI~R. ATTEMPT TO RELEASE OVERSHOT, WOULD NOT RELEASE. RIGGED UP DIALOG ATTEMPTED TO SHOOT OFF @ TOP OF 4' .PUP ON TOP OF PACKER. DRILL PIPE BACKED OFF @ 8000'. POH. PICKED UP scREw. IN SUB R1H SCREWED INTO FISH. WHILE pUTTING IN TORQUE TO TI'GHTEN D~ILL ~I'PE OVERSHOT TURNED, RELEASED OVERSHOT AND POH @ 0600 HRS. POH. W/OVERSHOT, INSTALLED ROTATING HEAD AND CHANGED OUT DRI'LL ING 'L INE. PIC.,E~~I~tOt:N]i~ASHP~t~.~W./PACKER=MILL'-AND FISU.~-N~'~TOO~;T. RING~ RI'H~Oz~UT~.VER-'~BAC.KEI~ WASHED OUT HARD ~._[~L~.~108~~:~-~0863:~. APPEARED 'T'O ~JASH TO TOP OF PACKER WHEN PACKER STARTED MOVING DOWN-.-HOLE-,- PUSHED PACKER. 65'_..AND_P~OH TO PICK UP OVERSHOT TO ATTEMPT TO RETRIEVE PACKER; .... RIH W/OVER- SHOT @ 0600. RI'H W/OVERSHOT, PUSH ~...ACKER;,gONHBOLE~:::~O"A-11091~, pICKED.,L~P PAC~ER.,~ND~.~O.V:ED..~Up:~HOL£-:;~..DRAG:.E.XTREMELyvHI~H. PACKER APPEARED TO SET~AGA~'N~=.~t0913~ (50" DEEPER THAN ORIGINAL SET). WORKED PACKE~UP AND DOWN WITH NO MOVEMENT, W~KED TORQUE DOWN AND _ COHT1NUED TO JAR FOR 4~ HOURS. ~A~.KER: RELEASED AND::..CAME ,OUT ~F]-~OLB. PACKER APPEARED TO BE I'N GOOD CONDITION. RELEASED MECHANISM W~KED OK. MILL,CUT SI'DE OF COLLAR 4' ABOVE PACKER, AND SOME MILL .MARKS ON TOP OF PACKER BUT NO DAMAGE. LAID DOWN FISHI'NG~TOOLS AND RIH W/BI.T AND CASING SCRAPER. TOOLS sTOppED ~N~~s~OWN~L~A]~2~'(]81" ABOVE ORIGINAL PBDT 12010') CIRC. HOLE CLEAN ~ 0600 HRS. PREP. TO RUN DIALOG CASING I'N- SPECTI'ON. 11/5/82 RAN DIALOG CASING INSPECTION LOG. THERE WAS EVIDENCE OF~A't~ DETERtORA.TION-i~lN::THE:;':INTERVAL~:/17..z_60=.to.:~118012~ THIS IS THE INTERVAL WHERE THE BOTTOM PACKER WILL BE SET. CASING CALIPER WAS RERUN TO CORROBORATE THIS, THE RESULTS WERE THE SAME. THE CALIPER INDICATED THERE WAS LESS THAN 30% OF ORIGINAL PIPE REMAINING. RIGGED UP DRESSER ATLAS AND P~-RFORATED~t890=-to~-lz!_9~!~-' ~:. AN~Z:l~OOd:o~:ll-740~'~40~- WITH ~t:~ASt~IG~UNS?FIR~ING ~..~--~~HOT:S'~£R'~'£OO]~IN:?A-20~D:.E~GREE PHASING. CONTINUED TO PERFORATE ~ 0600 HOURS. I III II i ii i ii ii I i '~'iIDDLE GROUND SHOAt A34-14RD2 _ _ 'KENAI, AK ' 10/21/82 11/13/82_ Sec.'11, TSN, R13W _ i~i i ill I IlL ~ i I I · I I i ii il · i I_i i _ -- ~ L ~i I _ III i I I I I IIII · _ _ · i .-- 11/6/82 gER FORAT ED: ~ 1~t 8_.9..0::-.~119 ]8~:-~..~28.~:T.~' A N D' AND ~t:~O~49~'i:~-~]lo,~X~F~T. ~OUR.~HOTS~.ER~OOT?WtTH:~ ~ASINGL~U~S.;:~t~OTOEGR~E~C~S~G: RIH WITH 'BIT AND SC~PER. CIRCULATED 3 HRS., POH LAID DOWN DRILL PIPE. TUBING COMPLETION. , 11/7/82 FINISHED LAY~NG'~DOWN':3~::~ DRI~,:LPIP. E AND:,DRI[t::~OL~ARS. PI'CKED UP THREE GUIBERSON UNIT VII PACKERS AND COMPLETION STRING. RAN IN HOLE WITH TUBING. COMPLE~ON::~T~PED IN CASING AND WOULD~;NOt~:~GO:~.E~:~t443~' WORKED PIPE IN UN- SUCCESSFUL ATTEMPT TO GET TO SETTING DEPTH. POOH WITH TUBING. MARKS ON BOTTOM PACKER INDICATED<~SING PARTIALLY COLLAPSED OR OUT OF ROUND. RE~SE MECHANISM WAS SHEARED ON BOTTOM PACKER WHICH WOULD HAVE PRECLUDED ITS SETTING. THERE WAS CORRELATION -BETWEEN -TIGHT--SPOT AND ANOMALY-APPARENT ~ON DIALOG CASING PROFILE CALIPER;- CALIPER I'NDICATED POSSIBLE OBSTRUCTION BUT WAS INCONCLUSIVEj REDRESS GUIBERSON PACKER AND PICK UP TOOLS TO 'SWAGE CASING. 11/8/82 PICKED UP~::.6~,,.:SWAGB, ~RS.¢~BUHBER,:SUBS ,(2).,F..ACCELERATOR~ AND- DRILL ~OLLARS~ND:~N.-'IN-HOLE..~O 1~24'~ SPUD'AND WORKED SWAGE IN UNSUCCESSFUL ATTEMPT TO SWAGE OUT OBSTRUCTION IN 7" CASING POOH AND CHANGED T0~':~::3/4~, SWAGE~:'~RIH AT 0600 HRS. 11/9/82 RIH WITH~:~3~:49~.:~ASI.NG~SWAGE~ SP~D;:SWAGE':X~ROUGH ~IGHT SPOT 'IN CASING AT~t:~,~;~'. POOH AND CHANGED BRAKE BANDS ON DRAWWORKS. SP. D,., ...... ,~T. iGHT:-SP~:., UNA ~24'. ~ ~~8~?S'WAGE::~HROUGH~ ', BLE -AT' REPORT ' TIME TO WORK 6"-SWAGE THROUGH. CONTINUE TO WORK 6" SWAGE AT RE- PORT TIME. 11/10/82 WORKEO,,~5:~.~/8~::,-SWAGE:~..THROUGH~OL~APSED CA~I..~G.A~Z142~- UNABLE TO WORK 6" SWAGE THROUGH;-- ~S~A~,'~:STUC~AND IT WAS NECESSARY TO JAR IT OUT. PULLED OUT--OF HOLE WITH SWAGES- PICKED UP 6" MILL- AND RIH PICKING ~P 3~". DRILL PIPE'.' PICKED UP PIPE AT REPORT -TIME. · 1i/11/82 P~KED UP DRtLL PIPE WITH TAPER MitL ON BOTTOM AND~'~.~SWAGE::~T ~0~. H'I'T ~~~~86,P PICKED UP KEL~~~L~D,~,~ROUGH TIGHT S'P~,t~Tr~-286~nd:.~t-~-424~ CONTI'NUED TRIPPING IN HOLE TO ~B2~' TRIPPED OUT OF HOLE LAyI'NG DOWN DRI'LL PIPE. MADE UP COMPLETION STRING AND TRIPPED tN HOLE HYDRO-TESTING TUBING. HALF ~AY I'N HOLE AT REPORT TIME. NO BAD TUBI'NG'AS OF REPORT TIME. ~ , ...?,'~IDDLE GROUND Sl-IOAL , A34-14RD2 L,'.KE, NAI,:.,AK 10/21/82 11/13/8~2 Sec.. 11, TGN, R13W i~ i l i i ·, j ii i ii iii iii i i [ i I I I I Il' II II I I l ! I · 11/12/82 ___FI'NI'SHED STRAPPING 'AND HYDRO-TESTING TUBING I'N HOLE, MADE UP OLD TUBI'NG HANGER .AND'SET-IN TUBI'NG SPOOL RI'GGED UP DRESSER AND RAN GAMMA RAY. CORRELATED LOGS, GOOD CORRELATION. UP ANI~]NSTAt]'tED,~:NEW.~:TUBING:'.HANGBR. RIGGED UP LINE OFF OF INJEC- TION HEADER TO SET PACKERS. PACKER i~I:~S'ET AT~.t?.95~tl/87~ SET WITH 1130 PSI PACKER ~?SET AT A1540~'115~2 SET WITH 1505 PSI PACKER~~ SET A~-.1.t167~11~8 SET WITH 1880 PSI PACKER ~ SET AT ~-190~.;10~9 SET WITH 2260 PSI - LAID DO~ LANDING JOINT. I'NS~AL~ED~.BACK~.~E~RE.~.~A~V~ IPBLgDDOWN;BOP, INSTALLED AND TESTED TREE. WINTERIZING ND CLEANING RIG AT REPORT TIME. ~ .... ' 11/13/82~ FINISHED WINTERIZI'NG-RIG-~-CLEANED_UP RIG.-.INSTALLED FLOW L~NE. BSI' CREWS RELEASED AT NOON 11/13/82,~-- .. . . I " Il I......... ~ ~ ~ I I ~IAfE OF ALASKA ALASKA O~-L AND GAS CONSERVATION CO-~,MISSION SU ' DR¥ AND R OR¥$ WELLS DRILLING WELL I-1 COMPLETED WE L LXEj~ Injector OTHER [] 2. Name of Operator SHELl OTZ COHPAtlY 3. Address . Wayne Simpson, 601 W' 5th Ave., #810, Anchoraqe, AK 99501 4. Location of Well Conductor 5, Leg 1 @ 5.31'S & 1.72'E from 'center leg @ 1622' RNL and 435' FEL Sec. 11, T8N, R13W. Elevation in feet (indicate KB, DF, etc.) D.F. 116' 12. I 6 . Lease Designation and Serial No. ADL 18756 7. Permit No. 66-2 8. APl Number so- 733-10086-01 9. Unit or Lease Name M~$ 10. Well Number A34-14RD2 11. Field and Pool MIDDLE GROUND SHOAL E, F & G Pools Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] ~ Perforations ~] Altering Casing ["] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well E] Change Plans F-J Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing ~ {Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). WORK BEGAN ON 10/21/82. JOB NOT COMPLETED. Alask~ Oil & Gas C, Ancl~0rage 14. I hereby certify that th~ foregoing is true and correct to the best of my knowledge. Signed Title. pRODUCTION ADMINI'STRATION The space below for Commission use Date 11/10/82 Conditions of Approval, if any: j By Order of a~l~proved by. COMMISSIONER the Commission Date Form 10-403 ~.ev. 7-1 -~0 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate .__. STATE OF ALASKA ALASKA L AND GAS CONSERVATION C 1MISSION SUNDRY NOTICES AND REPORTS OH WELLS DRILLING WELL ;'l, COMPLETED WELL m m m Inj ect0r 2. Name of Operator Shell 0il Company 3. Address 601 ~!. 5th Ave., #810, Anq. horage, Ak 4. Location of Well 995,,01 Conductor 5, Leg I @ 5.31' S and 1.72' E from center leg @ 1622' RNL and 435' FEL Sec. 11 T8N R13W. ' 7. Permit No. 66-2 8. APl Number 50- 733-10086-01 OTHER [] 9. Unit or Lease Name Middl e,,¢round Shoal 10. Well Number A 34-14 RD2 5. Elevation in feet (indicate KB, DF, etc.} i 6. Lease Designation and Serial No. D.F. 116' ! ADL 18756 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 1 1. Field and Pool NGSEF&G NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit ih Triplicate) {Submit in Duplicate) Perforate ~ Alter Casing []t Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans ~] Repairs Made [] Other Puli Tubing ~] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starti,~g any propcsed work, for Abandonment see 20 AAC 25.105-170). : See Attached. Plan to start work October ]8, 1982 hereby certify that the foregoing ~ true and ~orr~ to the best ~' my k~ e~ '~/~ ~' ~.,~. ~ ._ ,,~, /~ T~ Production Administration s~ace below for Commls~om use 10/4/82 Conditions of Approval, if any: I Approved Copy Returned J]Y LON~IE C. SMITH .... Approved by COMM!SSIONER the Commission Date Form 10-403 Rev. 7-1 ~O Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate A34-14RD2 MIDDLE GROUND SHOAL' WORKOVER STATUS: PROPOSAL: PROCEDURE: 1. 2~ 3. e . . . Bo . Currently choked baCk to +500 BPD.. HN/HR(U) was taking 63% of injection water, as of last survey (7/80). Well was previously' choked back from 3500.BPD to-+_1500 BPD in 8/81. Pull 'tubing and ~packer. Reperforate HC/HD, HK/HN(L), and HR/HZ with casing guns. Rerun tubing with isolation packers to mechanically isolate (within the wellbore) the HN/HR(U) thief ZOFle. M.I.R.U. wi.reline. Test lubrication to 3500 psi. Make 2-1/4" drift run, tag bottom and record depth (tagged fill 11,876'on 2/1/82). Pull dun~ny from KBUG mandrel at 10,698'. Have enough mud available on board the platform to kill well if necessary. NOTE- HC/HD 11,048' (8178' TVD). If it' is necessary to kill well with mud, a supplement workover procedure'will follow. M.I.R.U. on conductor 5, Leg 1. Rig up manifold from casing valve as shown in sketch. Leave valves and choke in overboard position. Set Cameron back pressure valve in tubing hanger. Remove tree and nipple up BOP stack with 3-t/2" Shafco stripper head. Test BOP stack to 3500 psi. Pull tubing and packers as required. Let well backflow overboard through choke manifold to keep pressure from building up. If oil or gas is pre- sent, run through platform on deck tank. Lay down ball valve nipple, KBUG mandrels and Uni-packer VII. R.I.H. with 6". bit and clean well out to bottom (12,010' PBTD). Use filtered'Cook Inlet water for circulating fluid. NOTE: (Tagged fill 11,876' 2/1/82). Rig up wireline and perforate HC/HD, HN/HR(L), and HR/HZ with casing guns as per attached supplement. Make 6" bit, scraper, and gauge ring run to PBTD. POOH. R6n Baker Model "F-l" packer on wireline and set at 11,775'. Pull wireline and ri g down. Run-tubing as per attached sketches. Stab into Baker Model F-1 packer. Set down on location assy. Pick up tubing and space out. Install tubing hanger. Allow enough tubing to slack off 2.5' after locator assembly has made contact with packer. Drop b~ll and pressure up on 3-1/2" tubing. Set packer at 11,560' with 1800 psi and slack off 6". Set packer at 10,920' with 2400 psi and slack off 2'. Land tubing hanger in tubing spool and lock down set screws. Maintain 2400'psi surface pressure for' 30 minutes and check for tubing and/or packer leaks.. Raise pressure to 3500 psi. and shear out shear sub. · ! ., 10. InStall Cameron BPV in tubing hanger. Remove BOP and nipple up tree. Test to 5000 psi. Remove BPV. ll. Install lubricator and test to 3000 psi. Run in with wireline and pull dummy from KBUG mandrel at 10,852'. F. ill tubing/casing annulus with 310 bbls. of fresh water treated with Nalco inhibitor. Replace dummy in mandrel. 12. Put well on strip chart and return to normal injection to test HR/HZ injectivii~y. Additional instructions will follow. APPROVED' DATE TS:~'ckk STATE OF OIL AND GAS CONSERVATION COL/~M I-rTEE i~DRY NOTICES AND REPORTS ON WEI~LS (Oo not u~ this form for proposa!s to drill or to dee, pen O,L F9 WELLL J q0--733-10086-01 6. l_:£.'-xSE D~L%IGNA-FION ANn SERIAL NO. ADL 1 8756 NAMEOF OPERATOR Shell 0il Company Use "APPLICATION FOR PERMIT--" for path proposals.) ADDRESS OF OPERATOR 1700 Broadway, Denver, CO 80202 LOCATION OF WELL At,-~e Conductor 5, leg 1 @ 5.31'S and 1.72'E from center leg @ 1622' FNL and 435' FEL Sec. l l 13. ELEVATIONS (Show whether DF, RT, GR, etc.) D.F. ll6' Check Appropriate Box To Indicate Nsture of No,qce, Re 14. Mi ddle Ground Shoal 9. WEt.L NO. /? MGSE. F. G. -TE- ¥~%$,' ¥S--R-;; -~ :7'i 6 LYr'f-¥-~ . · Sec. 23 TBN R13W 12. PERMIT NO. 66-2 ~ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTUREI'REAT St4OOT OR ACIDtZE R?PAI R WELL PULL OR ALTER CASING MULTIPLE C OM PL r--q' E ABANDON* CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SNOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Compl~l:ion or Recompletion Report and Log form.) · ~ DESCRIBE P~OPOSED OR COMPLETED OPERATICNS (Ct~arl¥ slate all p~rtlnent d~tall~, and 9tve pertinent dates, including estimated date of Cartin9 any proposed work. 7-10-79 7-11 -79 7-12-79 7-1 7-1 7-1 7-1 3-79 4-79 5-79 6-79 7-17-79 7-18-79 7-19-79 Waiting on wireline oper., new water injection line almost complete. No report Pulled five lowermost G.L. valves & ball valve. Preparing to convert to injector. No report Brought .Herlekickover tool over from Platform "C" and set No.. 3 and No. 6 dummies. Set ball valve and rigged down. Fabricating injection line for conversion to a water injector. Removed surface safety valves on fl owline and gas inj. line. Removed fl owline and gas inj. line. Installing water inj. line @ report time. Continued with installation of water injection piping. Started putting water down @ 4:00 PM. Final Report: inj, 3696 Bbls. @ 2900 psi. T,~LE ~/~/F77a/kf {This ~pace for State office u,s~) APPROVED BY CONDITIONS OF APPROVAL, IF ANY.- TITLE BATE see Instructions On Reverse Side F(,~m No. 10404 REV. 3-1-70 STATE- OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS OIL WELL G~S ~-] WELL OTHER 2. NAME OF OPERATOR Shell Oil Company 3. ADDRESS OF OPERATOR 601 West 5th Ave., Suite 810, Anchorage Alaska 4. LOCATION OF WELL Cond. 5, Leg ] @ 5.31'S and ].72' @ ]622' RNL and 435' FEL Sec. '11 E from center leg 50-733-1 0086-01 6. LEASE DESIGNATION AND SERIAL NO. ADL 18756 7. IF INDIAN-ALOTTEE OR TRIBE NAME None 8. UNIT FARM OR LEASE NAME Middle Ground Shoal 9. WELL NO. A 34-14 10. FIELD AND POOL, OI~-~LI)CAT MGSE. F. G. I 1. SEC. T. R. M. (BOT1-OM ttOLE OBJECTIVE) Sec. 23 T8N R13W 12. PERMIT NO. 66-2 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USEDt PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. 7-10-79 Waiting on wireline oper., new water injection line almost complete. 7-11-79 No report 7-12-79 Pulled five lowermost G.L. valves & ball valve. Preparing to convert to injector. 7-13-79 7-14-79 No report Brought Nerle kickover tool dummi es. over from Platform "C" and set No. 3 and No. 6 7-15-79 Set ball valve and rigged down. Fabricating injection line for conversion to a water injector. 7-16-79 Removed surface safety valves on flowline and gas inj. line. Removed flowline and gas inj. line. Installing water inj. line @ report time. 7-17-79 Continued with installation of water injection piping. ..- 7-18-79. Started putting water down @ 4'00 PM. 7-19-79 Final Report" inj 3696 Bbls. @ 2900 psi. NOTE--Report on this' form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and ~as conservation committee by the 15th of the succeeding month,unless otherwise direct~l. S H ELL OIL COMPANY 1700 B ROADWAY DENVER, COLORADO 802.02. October 14, 1976 State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Attention O. K. Gilbreth, Jr. .... o ~ NG 0 C.~C. I . R[:'7 DR,',,?[ ....... s:~_ ..... CONFER: 'F-ik: Gentlemen: Enclosed for your information are the completion data for our Shell-Atlantic-Standard Middle Ground Shoal A34-14 well. Included are the following: 1. Completion Report (Form P-7) in duplicate. 2. Well History. 3. Two sepias and two prints of all electric logs. 4. Directional Survey. KWL :ts ~ very truly, J. W. Kimmel Division Operations Engineer Rocky Mountain Operations Office Enclosures cc: Atlantic Richfield Company (w/Enclosures) Standard Oil Company of California (w/Enclosures) Amoco Production Company (w/Enclosures) United States Geological Survey (w/Enclosures) Files (w/Enclosures) DIV15iO~, OF OIL AND r-' SUBMIT IN DUI STATE OF ALASKA ':~Se~,:;~hor m- st l-nc[ions On ~. AP1 N~~ OIL AND GAS CONSERVATION COMMITTEE .... erse side; i ii i i i ii WELL COMPLETION ~R RE(O~?LETION RE?ORT AND LOG* ii ii ii la. TYPE 0F WELL: on, ~ t;asf~ ~VEl,I, WELL ~ DRY Other ~ b. TYPE OF COMPI,ETION: WEI.I. ~.__z (JVER ~ EN ~ BACK RESVR. Other 2 NlM E OF UP~RATOI~ Shekl 0~k Company 3. AI)DRESS OF OPERATOR ... 1700 Broadway~ Denver~ Colorado 80202 4. Lot'? ri,)N o~: W~:LL (Report location clearly and in accordance with any State requgremet, ts)* ,xt~f,~ Conductor 5, Leg 1 ~ 5.31'~ S and 1.72~ E from Center Leg 0 1622' F~ S 435' FEL Section 11 ::,: ~ At t,~p prod. interval reported below ~lz~ ? ~'~' ~ ~ '5 ~' At total dep~ 217.52' FNL a 2350.65~ FEL Section 23 -. l}; tOTAL DItPTII, MD & TVD~9.1 PLUG, B~CK RID & ~, ~ ~ULT~L~~ CO~L.. ~1. 'INTERVALS DR[[LLED BY 12,100-9033 12,010-8966 ~ow ~2~Y*_ ~oz~12,100~°°~ ' ~. PI~.f)DUCING ~NTEHVAL(S), OF THIS COMP~TIO~TOP, BOSOM, N'AME (MD AND ~)- ,23. WAS DIRECTIONAL ~ SURVEY NIADE 10,327-11,971, 7970-8937 I Yes 24. TYPE I,i[&7'T[2I(' AND (O'['[IE~ LOGS RUN 6. LEASE DESIGNATION AJND SERIAL NO. ADL 18756 7.IF INDIA_N, AJ~LOTTEE OR TRIBE NAiViE _ None 8.UNIT,FA2RA4 OR LF~kSE NAi'4E · Middle Ground Shoal 9. WELL NO. -- MGS A-34-14 RD 10. FIELD A2qD POOL, OR WlLDC&T MGS E.F.G. ;11. SEC., T,, R., M., (BOTTOM 1:[OI-~ OB, JI!iC'TIVE) Section 23-TSN-R13W SM CNFD, IES, CBL C/kSLN£', .%IZI'; [ WEIGI'IT. LB.FT..~ GRADE, 13-3/8" [6lit | J-55 9-5/8" 140~t | N-SO 7" 126~/ S 29t/ ~95-N8, 7" [29, 26 & 25~t N-80 SJZb] i TOP 28 PEIiFD!iA'IIONS OPEN TO I~RODUC~I~[OI~I ' (interval, size and number) i CASING RECORD (Report all strings set in well) 1565' 17-1/2 800 ax !'A" t - 5638' i 112-174 J 700 sx "A" I 11.48o' 8-3/4 I lOOO sx "G" 571~ 12;100 18-3/4 I 1.200 cUft 27. TUBING RECOFJ3 '" ACID, SiL©T, FiiAC2 L-RE, C~;IENT SQUL'L~ZE, ETC. 4 Holes/Ft .33 OD ii i, 11,049-11,075 11,600-il,760 11,806-11,872 11,918-11,940 ii PRODUCTION D£, I i.; l.'l t: ~:71' ! DI~,PT~[i 1,'~TF~VAL (MD) / A2i©UN£ A_ND I-2!ND OF AiiA~IEiLIAL USF_,D 11: 089-11:100 1130! hhl.q e~mmnt (.qqz) ._,574 -,t42 bbls (2 Sqz)' PIIOI)UCT1ON MILi[-fOD (Flowiing, ~.)r a3 lift, pamping--size and type of pump) Gas Lift 8/31/76 ~t,OW, 'Pt £:IN(; ICAS, I,NG' PRESSURE IC~ALCULATED oIL--BBL. .;.~u~;s. 90 I 590 )[ 596 31. o,sPOSVrmx o~* f;^s (So[d, u~ed for J'ue~, vented, etc. [V/ELL STATUS (Produckng or Producing OIL~}3DL. GAS~--P/iCF. 5VY~TER--BBL. ! GAS-OIL IL%TIO 298 ] 349 ] $ [ 117 GAS--MCF. [697 Reinjected and fuel gas DPT 32. 1,18'I' OF AI'TACI-IilEN'I'.'4 k,l~j ; rlectr gs~ll Sistory~ Directional Survey :;2'I hor,'b~Lt~regolng, ~ . _- , and attached information ts complete and correct as deter~f~,~~ ...... aw, a,.Q'l,b~,~o~s SI(;NE~~~f~ TITLE Div, 0pers. E.r, ' DATE *(See [ns*rucfion~ ~na S~ce~ lot Additional D~Ia on Revet~e Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well comp!et,on report end log on all types of lanJs and leases ~n Alaska. Item: 16: Indicate which elevation is used as reference (where not oti~erwise shown/ for depth measure- ments given in other spaces on this forr'q and ~n any att~zh,,:~ents. Items 20, and 22:: If this well is completed for separate prcduct~on from r'~ore than one ~nterv~l zone (multiple completion), so state ~n item 20, and in iten~ 22 show the prcJuc~r~g interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interv~l reported in iten~ 30 Submit ~ separate report (page) on this form, adequately identified, for each add~t~or/~l ~nte~ v~l to be seper~tely produce.J, show- ing the ackJitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shouIJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produc~cl. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDIN(; INTERVAL TESTED, PRESSURE DATA A-ND ~COVERI~ OF OIL~ GAS, 35. G ~G IC MARK~ WAT~ AND MUD , 3fl. CORE DATA. Aq~'ACIr[ BRIE. F ';D~O~I~'O~S OF L.ITILOLOGY. POROSITY, FRACWRF~. A~P~ ~{~S ANO DE'a'~'q~ED StIOWS OF O~L. G~S 'OR WA~. II I I _ A-34~ 1L~ Redri I 1 P1 atform A 12,000 G ,*-~ D.F. l tG' M I DDLE GI{[)t. JND bttOAL A34-14 Redri II P1 atform A 12,O00' G Pool D.F. 116~ 13-3/8" cs9. ® 1565' 9-5/8'~ csg, @ 5638' 7" cs9 ~' ] ] L:"~O' btlDDLE ~ ,~ G ~,OUtlD SIfOAL A--3L:-~IL+ Redril 1 P1 atfo rm A 12,000' G Pool D.F. 116: 13-3/8" csg. (~ 1565' 9-5/8'~ csg. ~ 5638' 7" csg. ©~ l l,L~-80' ]~j~ t) ~[.?Li E ' B i-~ OtJ i'-,! D SHOAl_' A--3~+- 1 L.' Redril 1 P1 atform A 12~OOO' G Pooi D.F. 116' 13-3/8" csg. (73 1565' 9-5/8" csg. ~:~ 5638' 7" csg. (~ 11,480' 10/18 PBTD 11,370' I4ixing mud° Mud: (.520) 75 pc'F/45 Rigged up at 9:00 P.M. 10-17-75. Started pumping 75 pcf mud dowr, tubing. Pumped approx. 540 bbls. mud. Had returns to the surface, gas cut to 65 pcF. Circulating and mixing mud. 10/19 PBTD 11,370' 'fryi~g to work p~cke~'s Hud: (.514.) 7~ pcf/%2/18.0/12,000 C1. Circulated around 75 pc'f fTlUd. Installed Cubit, 9 back pressure valve. Removecl production tree, Flanged up riser and BOP. Pressure t. ested Hydril and 2-7/8" ~ubin9 rams with 1500 psi, held okay. Circular:ed up. LlnseaLed LL~bing ........................ b.a.gqe.E, We.ri<lng pacl<er loose. t,./.~ / ,. , PBTD 11,370' Laying dowr, 2-7/8" tubing. Hud: (.514) 7L~ pcf/QO Circulated and tried tc) work packers free for G hours. Removed tubing back pressure valve. Rigged up Dialofi,, Ran freepo indicator, stopped at tubing at 9(~8'. Found tubing free above this pein1:. Rigged up and ran 2--1/8~ jet cutter, stoPF:,ed a't gas lift valve at 10,176~ Cut off 2-7/8" tubin9 at 10,1~1'. Laid down approx. 300 joint~.; of .......................... tubing, and 7 gas 1i1:~ valves at r~l')orL PBTD 11,370' Picking up 3-1/2" drill pipe. Hud: (.514) 7~ flcf/4-1/]8.0/1200 Cl. ~Laid down 2-7/8" tubing, gas l i-F~ mandrels, and Guiberson packer. Picked up k~:lly. Changed to 3-1/2" pipe rams. Lli~loa(!ecl 11,500~ of ~-1/2" drill pipe from supply boat. Hade up Trig-state fishing tools. Picking drill PiPe (ama)rex. /:'/:;.-. :7,/..:~ PBTD 11,370' Cleaning (-)[~t: scale and 7" casing, Hud: (.51Q) 74 pcf/~2/10. 0/1200 C1. Picked up ~-1,/2'' drill pipe, located top of fish aL 10,181'. Circuiated boLt:ems up. Yeti<ed over the top of the fish. Tool< hold and jarred f'or one hour, came free. l. aid down'fishing tools and I)roduct:ion equip- ment, Mede up 6" bit and gO' of 4..3/4" dr'ill . . , -.~ Hi D'D EE'" G R OU iq~"""~'H OAL A- 314-- 1 z~ Redri ll Platform A i2,OOO' g Pool D.F. 116' · 13-3/8~' csg. @ 1565' 9-5/8~' csg. O} 5638' 7"-csg. @ 11 ,/-~80' ' ........ hlDDLE,GROUND SIIOAL PBTD 11,370' Running in with 3-1/2" drill pipe. Hud: (.520) 75 pcf/h5/lO.O/1400 Cl. Cleaned out to 11,317'. Circulated up. POtt. Ran ii-, 3-1/2" open-ended drill pipe to 11,314'. Number one and nunlbeF two mud pulnps grounded out. Rigged up B.J. Circulated up. Mixed 200 cu.ft, class G cement, 3/1~ of 1% water loss addiEive. Displaced h32 cu.ft, mud. C.I.P. 10:10 P.M. 10-22-75. POll. WOC 8 hourr;. ..Runnino in 3-1/2~' dFill pipe; /~A:us/,,-: A=3h-]~ Redri ] ] P1 atform A 12,000' G Pool D.F. ]16' 13-3/8" csg. @ 1565' 9-5/¥" csg, ® 5638' 7" csg. 0 11 ,ti-g0' . A-3h-lh Redri I 1 Platform A 12,000' G Pool D.F. 1 13-3/8" cs9. O 1565' 9-5/8" csg. O 5638' 7" csg. 0 57t0' 10/25 PBTD 11,370' Pulling out drill pipe. Mud: (.520) 75 pc'F/hl4/8.0/1200 Cl. Ran in 3-1/2" drill pipe and found firm cement a'L ] O, 955 ' . C i FCU ] ated up. B.d. mixed 200 cu.ft. APIG cement, 3/4 of water loss additive. Displaced with h17 cu.ft. mud. C.I.P. 2:00 P.H. 10-23-75. POH. Cut off 200' of dri]]infj line. WOC 8 hours. Ran in open~-ended dri]', pipe and found firm cement at 10,861'. Circulated up. B.J. mixed 160 cu.ft, class G cement, 3//+ of 1% water loss additive. Displaced with h20 cu.ft, mud. C.I.P. 5'OO A.H. 10-2'-'t-.-75. Puiling out drill pipe. 10/26 91+85'PBTD Circulating tip Mud: (.51/+) 7h pcf/Q5/lO/i200 ppm C] POH. WOC 8 hrs. Ran in open-ended D.P. Found fi rm cement .at ]0, ]Z~]~. Circulated and conditioned: mud around. B.J..mixed 200 cu.ft.cla: G cement, 3//4 of' 1% water- loss additive. Dis- pl aced wi th 383 cu. 'ft. of mud. C i P at POH. WOC 8 hrs. Ran in open-ended D.P. Found fir. m cement at 91485'. 6irculat~ng up. 10/27 9h85~ PBTD Laying down 7" casing Mud: (~500) 72 pc'f/hO/]/+/1600 ppm C POH. Laid down 6000' of 3-1/2'~ D.P. Hade up Tri-state 7'~ casing cutter. Rill. CuE 7~ ca.sim?! at 5710'. Circulated aFound 9-'5/8" annulus. F'Oii, Laid down tools. Unf]anged and raised BOP stack, Removed tubing spool. Hade up Tri-state casing spear. Set 7" casing. Pul]ecl off the hanger with 250,000;?. Removed slips, pacl<in9 unit:,. Flanged up drillin9 spools and BOP stack. Layil~!i down 7" casinq. 9485' PBTD Pict<ing up 5" D.P. Hud: (.500} 72 pc'F/l.t. 2/12/1400 ppm C1 Laid down 5700' of 7" casing. Ran in open- ended 3-1/2" D.P. to 5750'. Circulated up. B.J. mixed i00 cu. ft. class G cement, 20% sand, 3/li of 1% Friction redu.cer. Displaced with 228 cu.ft, oF mud. CIP at 4:30 P.M. Laid down 186 .joints of 3-1/2" D.P., 90' of /+-3/ll,'' D.C. Hade up 8--3//4.'' bit and one 6-3/1I," ..... M'I-BD-[:E 'GROUND SftOAL A-3/+-14 Redri 11 Pi a'tform A 12,OO0' G Pool D.F. 116' · 13-3/8'! cs_o,.. ® 15r55' 9-5/8" cs9, ~ 5638' 7" csg. ~ 5710' 5674/31 ' Dynadr i 11 ing. Mud: (.490) 72 pcf/Z~O/15.0/18,000 Cl./1% oil Finished picking up 5" drill pipe. Tagged of cement at 55!9'. Circulated I~ole clean. POH. Tested blind rams and pipe rams to 1500 okay. Tested Hydril to 1000 psi, okay. Ran in hole with dril]ing assembly. Drillecl firm cement 551!)/56L~3'. Circulated hole clean. POH. Picl<ed up dynadri11. Ran in hole to 56Q3'. Rigged up scientific e'/e tool. Fac,.-;d dynadrill S-65-E to achieve S-t5--W clirection. Now dynadrillinq. SHOAL: ' ' //,/,7:,/,~ A~31+-14 Redri 11 Platform A 12,000~ G Pool D.F. !](-:' 13-3/8" csg. ~a 1565' 9-'5/8" csg. @ 5638~ 7'~ csg. @ 5710' DaLE GFIOLIND StiOAL A-3~-IQ Redril i Platform A 12~000 G Pool DeF. 116' 13-,-3/8" csg, ~,) 1565' 9-5/8" csg. (~) 5638' 7" csfl. C~ 5710' 5805/131 Mud' (. Dynadri l Ri gged u Dri 1 led hole wi t plus 12' Oriented Surveys: ' Dri 11 lng. 500) 72 pcf/h.0/8.8/lh00 Cl/1,50% oil led 1:o 5730', tripped for bit .;//3. p eye too!. Oric:ntc. d d'r'n~'~drill. and surveyect to 5800' Pulled out o'~ h eye tool, Picl<ed up two singles pup, Ran in hole with eye tool, dynadri 1 I. Dri 11 ing. 5713/~3~ O'/S-lb-W 5730/~-2° 30'/S-~ 5805/q2° O'/S--I 5850/45' Dr il l i rig. Mud: (.500) 72 pcf/hO/7.ll./1LlO0 Cl./l% oil Dynadrilled to 5818'. Had 1-1/2 hours rig repair on Tatco recorder ancl pump pFessuFe gauge and 1-1/2 houl-S on Dialog unit en,qine. Rigged down eye tool, POH. Laid down dyna-- dril]. Picked u'p stabilizers and 21 joii~ts of 5" heavy weight drill pipe. RIH. Ream- ed from 55~3/5818'. Survey: 5 (:J¢3//4l~° O'/S-16-W Coords: ~588.71/S-2776.98/W-698.58 MIDDLE GROUND SHOAL A--34.- 14 Red r i 1 l P1 atform A 12,000. G Pool D.F. 116' 13-3/8" ese. 0~ 1565' 9-5/8" csg.. ~) 5638' 7" csg. 0 5710' 11/1 11/2 ///9/:;.-' 5994/162' Preparing to pull out of hole. Mud: (.507) 73 pc F/41~/7. 0/1300 Cl ./1% oil Drilled to 5832' (20' correct:ion in drill pipe measurerrent). Circulated hole clean. Dropped survey, 1-1/2 hours to thaw out frozen kill and fi]lup lines. POH. Picked up one 6-3/4'l drill collar, operate BOP's. RIH. Drilling and surveying. Had one misrun at 59Z+7' Surveys' 5818//~.0° 30'/S-l-E 5832/39° 15'/S-3-E 5947,//~.0° 15'/S-4--E Coords: fl816.67/S-2976.16/V/-707.1+1 6177/183' Surveyed, preparing to POrt. Hud: (.507) 73 pc'r/zG/5.0/i300 C],/1.,57 oil Tripped for bit. Had rig repair, Wol-l<ed on rotary table clutcl~, Fouled o~,1 accu~p, ulator and valve, liad war:er in accLunulator oil. Checked BOP. Pumped through choke line and manif:old, drained the same. Drilling at,d surveyil~g. Surveys: 599Z+/4]o IS'/S-I-~-E 6177/~5.° 30'/Sr3-E Coords: l+980.28/5.-3137.l+l/V~-675,1-t-2 .................................. i<fi"i~D'CE'' GROUi~D SI.iOAL 11/3 / · 63~2/1 65~ Dril I ing. Hud: (.505) 73 Pcf/+5/L~.$/1350 C1./1.5/~ oil Pulled 32 stands of drill pipe. Lost plat- form power. No power Sc, rig For lt.-1/2 hours. Finished out of hole. Checl<ed BOP operation. Found accuinlator systei'n 'Fl'oze~, Worl<ed on accumulatol" and 'pulnps. Changed oil. Flushed complete system~througt~ in hole with bit #7. Drilling. · / · /1/ ';;" / /- A-31~-lZI· P, edrill '6503/161' Drilling. Platform A Hud' (.505) 73 pcf/h-5/5,0/130C) C1./1,5% oil 12,000 G Pool /-;~.~., DrilleJ-' to- 63p2r- ', surveyed. "lr~pped' For bit. D.F. l l6' /L/j/)" ,, Checked BOP operation, al i el<ay. Dril led to "cs 15651/iF~:~"/:~ .-, 6447', surveyed Tripped for bit Picl<ecl 13-3/~ g~ 0 9-5/8' csg. ~ 5 ~ui ,~ ~:)' # · , . : . ' . 638 ~ ~ ~ /~/?~ ~..up ]ockeo-~n dr~ll~ng assembly. Had one Imur 7" csg. O)5710' ' ,z ~ ,~':,.- . ."?~ ~ //'~wn time for rig repairs. Changed ouE rotary Or~, '~?.9'- ///Jable air contl-oller. Drilling ahead. ":":'J~ 0~4 a 6447/54 30'/S-.3-E ' '"'..-~.~O~, Coords: '5tQ4.99/S--3351.O4/W-689.61 H IDDLE GROUND SHOAL ' ///4.2,,:(. A-34-th- Redril 1 Platform A 12,000' G Pool D.F. 116' 13'~3/8'' csg. q~ 1565' 9-5/8" csg, O)5638' 7" cs~. (~b 5710' 6855/352' D,-i I '1 lng. /.iud: (.500) 72 pcf/Z/-f/4.8/1350 C1./1.57,; oil Drilling and surveying. Survey' 669~/57° 15'/S-.1-E Coords: 5278. 61/S-3558. 75/W-685, 98 MIDDLE GROUND SHOAL A-~34-14 Redril 1 Platform A' 12,000' G Pool D.F. 116' 13-3/8" csg, @ 1565' 9'-5/8" cs,fi. ~-~, 5638' 7" csg. (~) 5710' 1 '2'~ H1Di~LL.G:,OUND SHOAL A-~3Lwt4 Redrill Platform A i2,000~G Pool D,F. 116' 13-3/8" csg, F~ 1565' 9-5/8" csg, @ 5638~ 7'~ csg. (~';~ 5710' 8-3/4" ho'le MIDDLE GROUND SHOAL A-34- 14 Redri 11 P1 atform A t2,000' G Pool D.F. 13-3/8" csg. ©~ 1565' 9-5/~~' csg. C~) 5638' 7" csg, ~ 57]0~ 8'-314." hole 11/8 7175/320 ' D r ! 11 i rig. Mud: (.500) 72 pcf/Q5/5.0/1300 Cl./l% oil Drilling and surveying, Survey: 6946/58© 30'/S-2-E Coords: 5409.76/S-3772.63/W-678.51 7215/Z~0' Drilling wit Mud: (.500) 72 pc'F/Fi Drilled to 7191'. POH and control lavers· C of drilling line, Mad drill. RiH. Oriented to 7215'. Survey: Coords: 7293/78' Mud: Dynad,- Made ~ single Reamed s toppe a s s el-lib a s s emb h a dynadrill. /5.011000 Cl. · Repaired rotary clutcl~ ut off approximaLely 150' e up and serviced dyne- wit[', eye tool. iS~-illcd 7191/60© O'/S-3-~E 5532. 2611107.92/S-398z~. 52IW~667. I , ,"//~;~/// , Running in drilling assembly, (.5o0) 72 pcf/4~/fl..8/]0o0 cl. iiled to 72.c)3'. POH. I_aid down tools. p drilling assembly. Picked up s of heavy weight drill pipe. Rill. dynadrill run from 71Si/72~2' and bi d. Heasured out, Checked drill iy. Running in hole with drilling ly. 11/9 7563/270' Dr i 1 I ing. Mud: (.500) 72 pc'FI43/4.3/lO00 Cl. Finished running drilling assembly. to 7563~ with bit Surveys: 731Q/54© 45'/S- l I~--W 7465/54 © O'/S-17-W Coords: Drilled 5692.01/1329.09/S-Z~t98.811W-.727.~3 11110 7803/2~0' DFilling with bit i'~'12. Hud: (.500) 72. pcf/42/4.0/lO00 Cl. Drilled to 7690'. POH. Changed drilling assembly.. Repaired the hook ]asl: and air valve on drill clutcl~. Rill. Drilled to 7803' Survey: 7687/52 © O' Coords: 5828.69/1503.92/S-Z~363.20/W-787.26 MIDDLE GROUND SI-IOAL A-34- 1L~ Redri 1 l P1 atform A 12,000 G Pool D.F. 116' 13-3/8" csg. ~t; ]565' 9-5/$" csg: ~ 5638' 7" csg. ~0 5710' 8r.-.3/L¢' hole MIDDLE GROUN[) SHOAL A-3Z~- 1~ Redri 11 P1 atform A 12,000, G Pool D.F. 116' 13-3/8" csg. FL' 1565' 9.~5/8'' csg. ~ 5638' 7" csg. ~ 57t0' 8-g/Q-" hmle HIDDLE GROUND StIOAL A~34-14 Re:d r i 11 Platform A 12,000 g Pool L}.F. t 16' 13-3/8" csg. @ 1565' 9-5/8" csg. ® 5638' 7" cs9. (,Lb 5710I i, i i[.)DLE GROUND SHOAl_ A~3Zl.- 1L~ Redri 11 PIatform A 12,000' G Pool D.F. 116' 13-3/8~' csg. @ 1565' 9~5/8'' csg. @ 5638' 7'~ csg. e 5710' 8~3/~u' hole HIDDI. E GKUUNU bHOAL A-3h- 1l~ Redri 11 P1 atform A 12,000' G Pool D.F. 116' 13-,.3/8" csg. ~ 1565' 9-5/8" csg. ~ 5638' 7" csg. ~ 5710' 8--3/~t.'' hole 8205/I~02' Drilling witl~ bit //12. Mud: (.500) 72 pcf/40/4.1/900 Cl. Drilled 'l~o 8205' with bit //12. Changed packing and swivel. Drilling. Survey: 7937/53° 15'/S-19-W Coords: 5978.27/1703.96/5-4552,50/W-852'~'~7 8515/310' Drilling with bit #12. Hud: (.500) 72 pc'F/L,'.2/3.8/IO00 Cl. Drilled to 8515' with bii- //12. Made 10 stand wiping r'un at 8278'. Had a power shut dow~ for 1-1/2 hours. Survey: 82Q7/5~+° Lt. 5 '/S.- 18-W Coords: 6157.19/1956.50/S-~793 · 37/W-930.70 ld,,x.V ,'., 8605/90' Drilling with bit /113. Hud: (.520) 75 pc'F/L~3/3.8/1000 Cl. Drilled to 8560' with bit //12. Ci rcula[ed and worked up thr'ough Light hoie from 82~0/ 8170'. Made trip For bit change. Drilling with bit #13~ Survey: 85 60/5/~-° 15'/S-21-W .... Coo~1ds.: . 63QO.OG/2210.Lt'8/$-5030~52/W-1021'73 · ' / /~ ,,// ,,/,, ~7//.:- 8880/275' Drillil~g with bit .#13. Mud: (.520) 75 pcf/fl5/3.Q/lO00 Cl. Drilled to 8880' with bit //)3. Hade 10 sl:an~ wiping, run at 8760'.- Drilling. Survey: 8880/53° 30'/S-22-W Coords: 6530.LI.O,/21-~G7.TI/S-5269,02/W-II]8.09 ~ /... //'//"'~ Il/15 9150/270' Drillin9 with bit Mud: (.520) 75 Pcf/ll'2,/3.6/]O00 Cl. Drilled to 9]50'. Made trip for bit change at Survey: 91N~/53~ 30'/S-Z3-W Coords: 6687.%.3/2679.90/S-5~GZ~.37/W-1201.01 11/16 9370/220' Drilling with bit #IL~. Mud: (.520) 75 pcF/~F~-/3.8/lO00 Cl. Drilled to 9370' with bit //14. l j.~j,~7 9655/285' Drillin9 v:i~l', bi,: //,z,.. OCT 9 !976 Mud. 75 Dr'il led to 9655' wi t:h bi t /'/114, sut'veyecl, DWIS~ON OF OIL AN~ r~' . Made i0 stand wipimg I'Lin at: 9412'. ,.' .........~ Survey: 9412/52° 30'/S-2I~-W .... Coo rds' 6850.58/2892.39/g--';,5';8.61/W- 1287.49 H IDDLE GROUND SHOAL A-3L:--Ib Redri 11 P1 atform A 12,OOO' 13 Pool D.F. 116' 13-3/8" csg..~ 1565' 9~5/$" csg..@ 5638' 7" csg, .(P 5,710: 8- 1 !'Z" hn! e. H IDDLE aROUND SHOAL A-31+- 1Z~ Redr'i 11 P1 atform A 12,000' G Pool D.F. II:6' 13~3/8~ csg. ~ 1565' 9-5/8'1 csg, O) 5638' 7" csg, e 5710' 8-]/2~' hole HI DDLE GROUHf} SHOAL A-3h- iz~ Redri Il Platform A 12,OOO' g Pool D.F. 116' 13-3/8" csg. (c,~ 1565' 9-5/8" csg, @ 5638' 7" csg, @ 5710' 8-. '1/2'~ hole f.IiDI)LE GROUND SHOAL A-.3h- I z+ Redri 1 ] Pi atform A 12,000' G Pool D.F. 116' 13-3/8~' csg, 6~~ 1565' 9-5/8" cs9. ~ 5638' 7~' csg. ~a 57tO" 8-1/2'~ hole 9735/80' Dynadri I 1: rig. Mud' (.520) 75 per/fl. 2/3.8/600 Cl. Drilled to 9688' with bit ,//ll-~. Circulated up. Propped survey. POH. Made up dynadrill and tool. RIt-I. Rigged up eye tool. Oriel~tcd and drilled from 9688/9~5' Survey' 9688/54° 3 /S~2li'-w Coords: 7010.85/3116.9~/S--5863.88/W-1778.88 4// 97~.0/~~ CirculaCin9 and working pipe. Hud: (. 520) 75 pcr/Z~-3/3.8/600 Cl. Dynadrilled from 9688/97hO', Laid down eye tool. POH. Laid down clynadrill. Repel red cat head and dynamatic brake. Hade up clriliin9 assembly. Ran in hole and bit stopped at ~8~~ Circulat:ing and trying to work tools free. " ~ ..C //'2 97Zt. O/U' Fishing, pulling out of i~oie wi[h dri I I pi De. Mud: (.520) 75 pc'r/z~'3/5.0/500 Cl. Rigged up Dialog. Ra~ freepoint indicator and back--off shot to 9655'. Tools free at 9582', at top of stabilizer, a~d top o'f drill pipe pup joint. Had split in pipe body while applying ]eft hated torque. Cut: off pipe below split. Pul lcd and r'eplaccd joint with ~" overshot. Ran in hole with back-off shot to top oF stabilizer and atteml)tcd to back off. Drill pipe backed off two joinLs al)ova heavy weight drill pipe at 8575'. Screwed back into fish. Attempted to work and circu]a'l:e ctrii] pipe free for 1-1/2 hours. Ran in hole wiLh freepoint indica,tor, tools free at 9002', Backed off drill string at 9002' (wire'linc'. measurement:). Pulling out of hole with drill pi pe 97l+O/0' F|shing, going in hole with jars. Mud' (.520) 75 pcf/h3/5.O/500 Cl. Finished out of hole. Hade up bumper sub, oil jars, and accelerator. Slipped drill line. RIH. Circulated and screwed into 'l'ish at 9002'. Worked anti jarred on fish for two hours. Rigged up Dialog. Ran 'Freepoint and back-off shot. Fish free at 92OO'. Attempted back off at 9191 ', had misfi re. Pul ]cd out of hole with freepoint. Chocked ~ool Ran in hole with'freepoinL, backed off drill string at 9191'. POH. Recovered 6 joints of heavy weight drill pipe. going in hole with fishing tools to engage fish. _. ............................... 'i:l'i f:}Sj:-[-~'-"GROUN P '-§ HoAE ................ A-34.- 1l~ Redri 11 Platform A 12,000' G Pool D.F. 116' · 13-3/8" cscj. ©) 1565' 9-5/8" csg. ~} 5638' 7" csg. (-~,~ 5710' 8-1/2" hole .............................. CROUND SHO^L A-3~-l/~ Redrill Pi atform A 12,000' G Pool D.F. 116' 13-3/8" c~g. ® 1565' 9-5/$~' csg. Fa 5638' 7" cs9, (~ 5710' 8-3/z~' hole ...................... OCT"t-9 !976- - 11/22 97/-I-0/0' Running Dialog freepoint. Mud' (.SZO) 75 PCf/~3/~.O/500 Cl. Cut and slipped drilling line. Instal led goose neck on swivel. Finished in hole. Circulated and screwed into i'ish ct (drill pipe measurcment). Jarred on fish. Circulated bottorn up. Spotted 50 barrels diesel with 25 barrels across fist~. Diesel inplace at 1.00 P.H. Worked fisl~ing str'ing and staged 2 barrels diesel each hour for 12 hours. Jarred on -Fi sl~ 3 hour's, no move- ment. Slugged drill pipe dry. Ru. moved swivel goose necl<, t{igged up Dialog. Ran freepoint indicator and back-off shot. ' 1]/23 97~K}/0~ going in hole with bit. WO~. Mud. (. 520) 75 pcf/h5/L1-.2/600 Cl lied~-,- ~' hour' br~a~-'~uov~n. ~ ...... R -, 'f:-~epc;i'.~t. ~-~i~'" 'free at 9220', Backed off' at 9211'. POll. Recovered one joint heavy weight: drill Left bit, stabilizer, cross-over, Honel, stabilizer, two dr'ill collars, stal) i lizer, ]2 joints 5" heavy weight drill pipe in hole. Top of fish at 92]1'' Picked up ]5 joints of drill pipe. Ran in hole open-e~,ded Lo ~211'. Circulated ~nd conditior~ed mud, Riflged tll) [~1 J, cenlei',teFs. Set: cenient plug at 9211' with 200 ft. class G with 3/Q% P~-$l. CIP at 11.30 P.H. Displaced cement with 868 cu. ft. of mud. POi.i. Picked up drilling assembly, IG joints heavy weight dritl pipe. Goil~g in hole. , 11/2~ 902~' PB'FD/O' Going in hole with dynadrill Hud' (.500) 7L~ ~cf/J+5/Zl-.2/~00 C1/5% 0il Finished in hole to 8700'. Circulated and con-. ditioned mud. Washed and reamed to top of at 87h8'. Drilled soft cement to 8518~, firm cement to 902Q'. Circulated and conditioned r:'~.,:'~ for cement contamination. POH. Picked up ................................... ~l~-~J~: ~ 1 ....... / ./, .. ///x .: / .. 9096/72~ Pu]led out of hole with dynadril] Hud, (.520) 75 pcf143/3.21600 C]15% Oil Ran in ho]e to',21]O~. Dr:ill string started taking weight. POH. Laid down dynadril'i. Went in hole with bit, dril] collar, stabilize~'. Tagged unidentified object at 21]0~. Finished in hole. Drilled 1~. Returns indicated drill pipe wiper in hole. Circu]ated bottoms up. PoH. Picl<ecl up dynadrFll. RIH. Riggect up scient:ific eye tool. Oriented dynadrill. Reamed 8' oF fill. Dynadrilled l:r~m Rigged down scientific eye tool. POH. _ . Iq iDI)LE GROUND SHOAL A-34- 14 Redri 11 P1 atform A 12,000' G Pool D.F. 116' 13-3/8" csg. ~ 1565' 9-5/8" csg: @ 5638' 7" csg. ~) 5710' 8~3/~" hole A-3h-ll+ Reclrill P1 atform A 12,000i G Pool D.F. 116~ 13-3/8" csg. ~ 1565' 9-5/8" csg. @ 5638' 7" csg. ~ 5710' 8-3/~-" hole .. 5¢/ -=~j~ ~. ,~.~ ~ //~ ' ~..~ / ~ . A-34-14 Redrill P1 atform A t2,000' G Por~l D.F. 116~ 13-3/8" csg. ¢~ 1565' 9-5/8" csg, ~? 5638' '7" csg, ¢)57'tO" 9'188/92' Drilling klud' (.520) 75 pcf/Lf5/3.2/500 C1/h-.5% Oil POH. Laid down dynadrill. Picked up hot:torn hole assembly. Slipped drilling lines. Ran in hole to 8980'. Reamed ~o 9096'. Drilling and surveying. One t~our rig repair, Broke rotary chain. Survey' 9182/52° 30'/S-32-W Coord' 6712.23/S-5482.65/W- 1227,°~' 11/27 93LI. 5/15~' Pulling out: of hole to change ///-~:"7"' bottom hole assembly, Hud' (.520) 75 Pcf/L~-7/3.0/500 Cl./h-.5% oil Drilled to 93~2', su~'veyed. Puil~d out oF hole to change bottom hr)lc: assembly. Survey: 93h2/55° 30'/S.-51-W Coords' 6802.85/2822.25/S-5565.63/W-2822.25 11/28 9Z+18/76' Pulling drilling asseiTtbly. Mud: (.52.0) 75 pcf/h.2/2.8/800 Cl.. Reamed hole fram 9002/~3h2'. Drl l led to 9Z~18' Tool< check shot at: 9352' Surveys: 93~-2/55~ 30'/S-33-W (corrected) 9~.18/57° O'/S-3Z~.-.w Coords: 68~4,2. z~./2898,71/S.-- 56/~6.08/W- i 33 5.3h. 1]/29 9525/]07' Drilling. '//,/,~' Hud- (.520) 75 pcf/4.7/2.8/lO00 Cl. Finished pulling drilling assembly. Changed bottom hole assembly. RIH. Drilled to 9525' 1/3o 12/1 9641/! 16' Dri 11.lng. //~ .'/?> Mud: (.520) 75 pcf/45/3.0/lO00 Cl. Drilled to 9611' wi~h bit //20. POrt, Changed bi l: and bottom stab] l izer, Ctlt off at)proximate1' ]00~ of drilling line. RIH. Reamed tight hole from 954.1/9611'. Drilled to 96~1' with bit //21. Surveys' 9558/61,.° 0'/S-38-W 9611/52° ]~5'/S-32-W Coords: 6958.61/30LI. 7.23/S-5771.11/W-I~27. ~3 9750/109' Pti I 1 i ng, /1_2 '/__5 Mud: (.520) 75 pcf/4-8/3.0/800 Cl. Drilled to 9750' with bit #2]. Repaired rotary chai n. Survey' 974/+/52° 15'/S-33-W Coords: 70140.03/3150.t-f6/S-5859.30/\,/rlhSh..70 9895/1LI. 5' Drilling witt~ bit //2l /.x,/~ / .... , 1/~ Mud: (.520) 75 pcF/Q. 5/2.8/8OO Cl, Drilled ~o 9895' wi ~h bi~ /72~, Made 10 s~and wiping FUn a~ 97GO' MIDDLE GROUND SHOAL A-34-1l+ Redri11 P1 atform A 12,O00' G Pool D.F. 116' 13-3/8" cs~. ~,) 1565' 9-5/8" csg: da 5638' 7" csg. ~) 5710' '8~3/h" hole MIDDLE GROUND SHOAL 9970/75 ' Dr i 11 ing. Mud: (.520) 75 pcf/h6/2.6/800 Cl. Drilled to 9970' with bit //22. Made trip for bit change at. 9904'. Changed out swivels. Rigged up and serviced kelly spinner. Thawed out pump discharge line. RIH. Reamed from 9844/99OZ+' . Survey: 990/4-/52© O'/S-35-W Coords: 7138.54/3273.3]/S-5962.SO/W-I!'J57oO~ A-3h~i~- Redrill Platform A 12,OOO~ G Pool D.F. 116~ 13-3/8" csg. {~ 1565' 9-5/$~ csg. {F~ 5638' 7" csg~ C-~ 5710' MtDI}LE Gt~OUND SHOAL A-3h~- 1/4- Redri 11 P1 aEform A 12,O00' G Pool D.F. 116' 13-3/8" csg: @ 1565' 9-5/8" cs9~ ,~ 5638' 7" csg. ~ 57iO' 8~3//4''. hole. M IDDi~E GROUND St-tOAL. 10,105/135' Drill i~g. Mud: (.520) 75 pcf/h-5/2.8/700 Cl. Drilled to 10,105' witl~ bit //22. Hade 10 stand wiping run at 10,O68'. Drilling. 1.O,195/90' Drilling with bit //22. Mud' (. 520) 75 pcf/hl+/2.8/700 Cl. Drilled to 10~195' with bit //22, surveyed. Made lO stand wipin9 run at 10,179'. Hade thFee splices in sand line. Repaired rot:aF.y cha in. Survey: 'i0,179/h7© h5'/S-37-W Coords: 7323.4~/3469.93/S-6125. . A~3h=lZ~ Redrill P1 atform A 12,OOO~ G Pool D.F. 116~ 13-'3/8" csg. @ 1565' 9-5/8" csg. Cg 5638' 7~' csg.'@ 5710' 8-3/4" hole 12/6 12/7 10,30/4/1091 Pulling out o'F hole. Mud: (.520) 75 pcf/hS/3.0/500 Cl. Dri]led to 10,3OL~' with bit //22. up. Dropped su Fvey. POH. Circulated 10,/4-4/4/140' Drill in3. /)--//7 '_,' Mud: (.520) 75 pcf/Zl. 6/3.0/500 Cl. Fini'shed. n-ial<ing trip 'For bit change al: 10,30/4-'. Reamed from lO,2L~/+/lO,30h' with rerun fill. Drilled to lO,/-'J4h-' Survey' 1 O, 30/4./h4© 30'/S-37-W Coords: 7h. 12.60/355h.55/S-6195.12/W-1732.26 1 O, 661/217 ' S u ,~ey i n9. Mud: (.520) 75 pcf/48/2.8/5OO Cl. Drilled to 10,661' with rerun //11. Made lO stand wiping run at 10,523' SuFvey: 10,523/39© O'/S--3.g-W Coords: 7582.78/3686.33/S-6302.21/W- 1818.98 HIDDLE GROUND SHOAL A~34- 1~- Redri 11 Platform A 12,O00' G Pool D.F, 116' 13-3/8" csg. ~) 1565' 9--5/8" csg. ® 5638' 7" csg. eJ 5710' 8-3/Z~.'' hole 12/13 10,994/99' DFilli Mud: (.520) 75 pc Drilled ahead wit:h couJd not i-etFieve with survey and 'Fo 12-1 l --75. Found t ng ahead with bit //26. f/48/3.2/1500 Cl. t:)~t //25. Surveyecl to 10,936'~ :-:u~-vey. Pul led out or hole F bit change at 10:30 A.M. ight hole at 'Q3 stands out. At 325,000# (hool< toad) set off .jars in both directions. Worked through Light hole 20 minutes. Pulled above 9-5/[3" shoe at Repai i-ed draw woFks water cooling system. Checked BOP operation while out or hole. Ran /~ in hole with bit :26. Reamed fFom 10,876' bottom, Drilling at 11:30 P.H. Survey: 10,936/29© Coords: 7930. 95/3893. 8$/S-Gq. gg. 73/W- 1PG5.75 11,]53../159' D:~]ling ohead w~th b~t //27, Hud: (.520) 75 pcf,/l~p/3.0 Drilled ahead with bit //26. Circulated bottom~: up. Surveyed and dry job at Il ,058'. Pul ]ecl out of hole .[OF bit change, Ra~l P.C.'s and heavy wall. Slipped and cut dr i ]]in(t line. Checked BOP operations, Ran in hole with bit 1/27. Drilling~ (No hole t:ro,,b]e on this trip), Survey' 11, O68/28© Coords: 80Z~.6.PS/39z-i-~.Z~6/S-6507.22,'W-20]~.O0 12/15 ! t · ]t,231/78' Running in hole with bit :.,28 Hud: (.540) 78 pcf/53/2.8 Drilled ahead with bit ',"-7~'~2 . Gas on ditcl~ ,'~fter drilling break at 1],]20/]],]l~-0'. Circ~lated bottoms up,de-ga'seal mud. Lost DC power for ]/2 hour. Circu]a~:e¢l bottoms up. Droppe¢! single shot. S]ippecl pipe. Pulling oul: hole for bit change. Survey: 11,231/29© O'/S--SI-W Coords' 8189. 51/~l.O 18.57/S-6556,95/W-2075.41 I'IIDDLE GROUND SHOAL A-34-14 Redri11 P1 atform A 12,000' G Pool D.F. I 16' 13.~3/8'~ cs.9. @ 1565' 9-5/8~' csg. ~ 56.38' 7" cs9. ~ 5710~ 8-3/4" hole M IDD~..E GROUND SHOAE A-34--14 Redri 11 Platform A 12,000' G Pool D.F. 116' 13-3/8" cs9. ~ 1565' 9'~5/8'' csg. L~ 5638' 7" csg. Ca 5710' 10,710/I-f9' Drilling with bit run /,/23. Mud: (.520) 75 pcf/45/3.0/500 Cl. Finist~ed surveying. POH. Cl'~angc, d bits and drilling jars. Dres:~e.d top ai~d bottom stab- ilizers. Thawed out water line to dynon~atic brake. RIM. Rearncd from 10,577/10,661'. Drilled to 10,710' Survey: 10,661/36° 15'/S-39-W Coords: 7694-. 0613764.. 361S-G365. 63/W-1870. 33 ,. ., , 10848/~38' Circulating up Hud: (.520) 75 pcf /];8/3. 0/600 ppm Drilled to 10,8~t8' wi'th bit //23. Took survey. Made ]O stand wipil,g run at ~p. Survey: ~0,81~/31 ~ 45'/S-39~W Coord. 7821.62/3839.8It.!S-642G.q7/t.~-]920,O] GROUND SHOAL A=34~14 Redr[ll P1 atform A 12,O00' G Pool D.F. 116' 13-3/8" csg, ~ t565' 9-5/8~'' cs9. ~ 5638~ 7" csg. ©) 5710' 8'"'3/4:' hole H fDDLE GROUND SHOAL, ' ........... A-34~14 Redri 11 P1 atform A 12,O00' G Pool D.F. 116' 13-3/8" csg. @ 1565' 9-5/$~' csg. ~ 5638' 7" csg. ~ 5710' 8-3/4" t~ole 10891143' POH Mud: (.520) 75 pc-F/45/2.8/600 ppm Cl Pul led drilling assembly. Hadc; up dynadrill and toolso Cut line. RIH, Rigged tlp eye 'tool, Oriented and dynadrilted from 108h8/10891' /4/~4' // 7'.::', 10,935/4g' Drilling. Mud: (.520) 75 pcf/48/3. 2/1500 Cl. Finished pulling. Laid down dynadrill. DC power was ofF'for 2 hours for repairs. :Made up drilling assembly. NIH. Spent 4 hours thawing out stand pipe and ct~angin9 O kelly hoses Reamed from 10,738/10, 91' Drilled from 10,891/t0,935'. N tDI)LE GROUND- SHOAl] .............................. ':;- .~;~ A-34-14 Redrill Platform A 12,OOO' G Pool D.F. 116' 13-3/8~' csg. (~ 1565' flf]}'! 9 !976 DiV!SiO!q OF OIL AND r7~- 11,310/79' Running in hole with bit /./29 reaming to bottom. Mud: (.540) 78 pcf/55/2.8 Ran in hole with bit //28. Reamed 60' to bottom. Gas kicked, mud cut From 78 to 71 pcF. Circulated and de-gased mutt. Repaired broken rotary chain. Dropped single sbt. Plugged pipe. Pulled out of hole for bit (.:l~ange at lO:O0 P.H.' Ran in hole wiLh new bit. t~eamed from 10,320/10,3Z~5' and l l,OLtO~ to botton]. Ream i nC. Survey: 11,310/30" O'/S-50-W Coords: 8257.93/4053.45/S-6582.34/W-4053.45 MIDDLE GROtJND SHOAL A-31f-lh Redrill PI atform A 12,000I G Pool D.F, 116' ' t3-3/8'~ cs~j~ i~ !565' 9-5/8" csg. ~,~ 5638' 7" csg. ~) 5710' ~-~"!"~ hole F~'I'DD[.E' GROU .~D SHOAL. 11,/-t. 90/180' Drilling ahead wit:h bit //29. Hud: (.SZ~O) 78 per/56/3.0 Reamed from ll,OZ~O' to bottom at 11,310' Drilled ahead with bit /,/29. Hade 10 stand short trip at 1:30 A.H., okay. Continued drilling ahead with bit ]/29. A-34-]4 Reclril] Il 634./IL;L~' Drilling ahead with bit /~29 Piatforrn A Hud- (.5/40) 78 pcf/35/3.0 ]2,000' G Pool Drilled ahead with bit //29. Both DC motors D.F. 116~ on draw works grounded out. with water taken 13-3,I8'~ csg, ~ ]565' in through fresh air intake. Dried out p/ ~' csg. ~ 5638~ motors and stone armatures. Replaced brushes, 7'" csg. ~ 5710' down 3-l/2 hours. Continued drill in9 ahend 8-3/~" hole with bit ff29. Hade 10 stand short trip at 3'00 A.H. at 11,622' Firsi' two stands off bottom pulled at ~I. 00,OO0/~/, next 8 stands at 325/350 ~ 000//. Ran back in okay. On boi:torn dri!l!n.g, at..4:]5 A.H. / · , -, H tDDLE GROUteD SHOAL /, A-3'~-- !t~ Itcd~- i I I P!atform. A 12,000' G Pool D.F. 116~ 13--3/8" csg. ® 1565' 9-5/8~' csg~ ~)5638' 7'~ csg. @ 5710~. 8-3/4" hole 11G$7/r53' Pull ing out of I-,o1(~ wi'Ll~ Diaio9 Hud' (.sLur:)) 78 per/52,/3.0 Drilled ahead with hit //2~. Stuck pipe at 11,687~ at 12:30 P.H. after' l~assing collars. Bit torqued up. Pulled h50,O00// I~ook load,. No jar action. Spo~ 20 bbls. o'r' disel across collars while holding ~25,000// on hook. Got jar action back at 2:45 P.H. Jars pulling at 290,000/,/-, very mushy action. Brought l)ial09 and Tri-Skate gear on helicopLer. Rigged up Dialog to run on scientific eye [ool wirelil~e ur:it. Tool failed on ]st ru~. FOI'I. Repaired L!.oL~' , I ear i n9 and reran. Backed off pipe a~ 11,~ Is 5 singtes of heavy wa]l drill pipe and too in hole. LL:;-? MIDDLE GROUND SHOAL A-BQ-- 14 Red r i 11 Platform A 12,O00' G D.F. i16' 13-3/8" cs~. ~ 1565' 9-5/8" csg. @ 5638' 7" csg. (0)5710' 8-3/4" hole 12/20 11,687/0' Circulating up. Mud: (.555) 80 pcf/!iO/2.8/900 Cl. Pul led out Dialog tools. Ci rculate~d bet:terns up. Hud gas cut to GO pcf. Conditioned mud to 80 pcf, POH, Cut oFF drilling line, Ran open-ended drill t~ipe to 5600'. Shut down for high winds. Finist~ed running in to the top of t:t~e fish at 11,404' Circulat:ing up. M IDDLE'GP, OUND SHOAL A-34-14 Redrill Platform A 12,000' G Pool D.F. 116~ 13-3/8" csg. @ 1565' 9-5/8" csg. @ 5638' 7" csg. ~ 5710' 8-3/4" hole 12/2t 1 ], 687/o' POH /?/.~. btud' (.559) 80.5 pcf,'/~8/2.$~500 t')P!" C!7"" '/~ Circulated bottoms up. Hud gas c:t~ Lo 70;,. Circulated and condiLionc,.cl mud around. B.J. cementers mixed 125 Ct,. f:t. clas~ G cement with 3/Q of 1% waceF Joss additive. Pu~nped ~0 cu. oF water ahead. Displacc~d with 105G cu. 'FL. CIP at 11:25 A.M. POlt. Laid clow~ 11 singles of heavy weight dri]l pipe. Moved (:ir'il]lng Made up drilling assembly. RIH. Located firm cement aL ]1,360'. Ci I'CU]aLed ,~c] cond] 'cioned mud around. POH. 12/22 11 250' PBTD/O' POI--I ,4~)/:~'-:~'~-''~'' Mud: (.555) 80 pc'F/l~5/2.8/600 ppm C1 Finished pulling out of hol~. Ran in dri ] ] pipe to ] ] ,360' Ci FcuJated bet:toms Ul). B.J. cementel"S mixed J~O cu. FL. of class G with 3/Q of 1% friction I~educel-. Purnpcd $0 ft. of water ahead. Displaced wTth 1070 cu. mud. C I P a~ 1:~50 P.M. POlt. WOe 8 hfs. Ran drilling assemb]y. Located i:JFIn cen]er~'L aC Cleaned out cemeht to 11,250'. CiFcu)c:tecl and cond j t i oned mud. POH. . . . 11,250 PBTD/O' CircLlla~ing and woFl.~ing pipe Mud: (.555) 80 pcf/55/2.8/GO0 ppm C1 POI-I. Made up clynadFil 1 and tools. Rill. up eye tool and Schlumber'ger line. ',Bi~ stopped aL 1] ,2QO' , could not pull loose. CiFcu]ated and workecl pipe. Spotted $0 bbls. of diesel oil outside o'F tools and heavy weight drill pipe with 20 bbls. inside dj'ill pipe. .Worked pipe. Boosted el] every $O ininutes. Tools wou)d not free. CiFculal:jng out diesel oil and WOFl<ing pipe. H1DDI_E GROUND SHOAL A-.34-14 Redri 11 P!,atform A 12,000' G Pool D.F. ]16'~ 13-3/8" c,~g. ~ 1565' 9-5/8" csg. ~ 5638~ 7" csg. ~ 5710' 8-3/4" hole A-3~.- !L!- Redri 11 P1 atform A 12,OOO' G Pool D.F, ]If' 13-3/$'* csg. ~-~ 1565' 9-5/$'~ csg. @ 5638~ 7~' csg. ® 5710' 8-3/b~'' hole 11,250' PBTD/O' Laying down fishing tools Hud: (.555) 80 pcf/51/2.2 Rigged up Dialog freepo.int back off shot. Found pipe stuck at 7000'. Backed off of i:ool joint aL 6971'. POH. Hade up Tri-State fishing tools, d,-ill collars, and heavy woigt~t drill pipe. RIH. Screwed back in tool:joint at 6971'. Circulated, jarred on 'fish for 4 Ran freepoint back off sho'L. Found pipe stitl stuck at 7000'. Backed off of tool join~ at 6971'. POH. .Laying down fishing . . 12/2,5 12'/26 11,250' PBTD/O' Washing over drill pipe Mud: (.555) 80 pcf/50/2.4/5OO pp,n C1 Finished laying down fishing tools. Waited on ,- j ~ _l. _! ' · ' O, u~i-S. Ran in open~ei,u~u dri ] i pij)e. Screwo., into tool at 6971'. Circulated arid conditoned mud, B.J. mixed 200 cu. ft. of class G cemer,~ with 3/l~ of ]% friction reduce~. Ptunped 30 ft, of water ahead '& lO cu. ft. behind. Di placed with ]04& cu, f~. mud. CIP at 7:25 Tried manual back off - no good, Ran Dialog strit~9 sho~, Backed off' joint at 697]~ POkl. Made up 1~0' of 7-5/f~'~ ']'ri-S~ate was~oipe and tool. RIH. Washing ovel' top of ~ool j'L. a t 6971 '. , PBTD 11,2~0/0~ Cjrr:.u]ating ~ condiLion:ng mud to shoe. joJ ~t. Mud: (.~41} 78 pcf/~O/3.0/~O0 C1. Washed over drill pipe from 5971/7150~ Pulled up 2~, wash pipe stuck. Circulatc, d and jarred on wash pipe 3 hours. Ran Dinlog Fr~epoint, stopped at 7081~, Hade manual bauk-off on top of washpipe saf~::t:y joint. POll. Laid down tools, Ran in dri]~ pipe. Could not get in top oF wash pipe at 5~59~.' Pulled up inside 9-5/8'~ casing. ~ircula~ing and condJti'oning mud, 12/27 PBTD 11,250/0' Circulating. /'.~ ?~.~./'/:.. Mud: (.5z~1) 78 pcf /50 /3. 0 /500 Cl. Circulated and conditioned mud at 5600' Ran in open-ended drill pipe '['o 5945'. B.J. pumped 350 cu.ft, class G cement~ 3/4 of 1% friction reducer. Pumped 30 cu.ft, water ahead and 10 cu.ft, behin~ Displaced 512 cu.ft, mud. CIP at 2:20 P.M. POI-1 Laid down l-t6 singles of 5" drill pipe. WOC 12 h ~ . Ran in open-end d,'il 1 pipe. l_oc;ated fi rm cemen~ at 5755', Circulating up, 12./28 PBTD 5460/0' Securing rig for stancl by. Circulated LIp. B.~I. mixed 170 cu.ft, cla~ G cement with ~/14 of 1~) friction reducer. Pumped 30 cu.ft, water ahead and ]0 cu.ft-, t)ehir~d. Di: ..... pl~3ced with 520 cu.ft, mud. glP at 10',~) A.H. POH, WOC 12 hours. Ran in 8-3/lt~ bit and 5~ drill pipe. Located firm cement at 5l~60' Laid down drill pipe. Washed out pumps and BOP. 9]o ed blind rams. Released rig at t2.00 noon 2-27~75, A--34.-14 .~Nadril! Piatform A I2~000' G Pool D.F. 11..6' 13-3/8" csg @ 1565' 9-'5/8" csg @ 5638' A-34-14 Redriil Platform A 12~000' e Pool D.P. 1.116~ 13-3/8:' asS @ 1565~ 9-5/8" csg $ 5638~ "FR" 5600/54/]./0. Circ'g & cond'g mud. Spud'd w/Rig /f3 @ 3,2 mid',:ight 6/7/76. Ran in g-.l./2~' bit & I j t 5" hvy wt DP & 5" Grade C Df'. CO cmt ~ ~'om 5450-.5600, Nud: (.499) 9,6 x 35 569~/5~/2/~1.9.~. Fulling Dyna-drill. CO cmt from ~a00-5643.~' ~' Pulled tools. Ran EYE tools; oriented & Dyna-.drld from 5643-5692. Mud: (.499) 9,6 x 38 5827/54/3/!35. Drlg. Made up D.A. & worked thrt~ Dyna~dri. Ran from 5643-5692 & drld to 5827. Hud (520) 10 x 45 d~[{ ~0 lO~O 5945/54/4/118. Drlg, RIH w/rubbered ])P & reamed from 5744-5854. Der: 5675' 43 deg S19.8W, 5725' 44 deg $20.3W, 5775~ 45 deg S20 m'.~ ~"~ ~:'~ :,~2_~ 46 de? S2J. W Hud: (.509) 9.8 x 45 x 6 6!12/54/5/167. Drlg. Dev: 507:) 48 deg S22W, 5925' 4o deg $22W, 5975' 50 deg $21N - U:VD 4815.65, V Sec 203.07~ !94.84S~ 73.26W. Hud: (,520) 10 x 45 x 5,6 (Oi1'3%) JUN 14 I97(; 6/12: 6350/54/6/238. Drlg. Da.v: 6050' 52 deS S26W, 6100' 54 deg S28W~ 6150' 55 de~ S31W.~ 6200' 57 deg S32W 6250~ 60 dag S31W~ ~iud: (o52()) 10 x 6'3 x 5 (Oil 2%) _6_.~2.:.1: 6500/5/}/7/150. Drlg, Dev: 6300' 61[ deg S3iW, 6350' 61 deg S30W~ 6394' 61 de.g S28W, 6433' 6.'i. der Mud: (.520) l0 x 4,3 x 4.8 (O:i.J.. 3%) 6/14: 6833/54/8/333. Dr±g, Der: 6:528~ 62 deq S28W, 6687~ 62 deg S31W, 6781' 63 deg $29W- TV]) 52001 V Sec · ' a~ 396 08W 854 69, 7oo.76S~ . . Mud: (.514) 9.9 x 44 x 4,6 (o:i_J. 2%) '.'.:'. A-34-14 RedrilI Platform A 1.2,000' C Pool D.F. 11.6' 13-3/8" csg @ 1565' 9-5/8" csg 0 5638' 6907/54/9/74. Reaming, RU EYF, tools. OrJ. ent. ed& dyna- drtd from 6844-699,7. Reamed from 6800..-6907. A-34-14 ' ' Rear iii ~ lo, t form A 12,000' G Pool D.F. ].16' 13-3/8" csg @ 1565' 9-5/8" csg @ 5638' A-34-14 Redri±l Platform A 12,000' O Pdol D.F. ].!6' .13-3/8'! csg @ ]565: 9--5/8" csg @ 5638' ,~..--3/,,-1 4 R .... Pla t form A ~.,~ 000',O Pool 9~-5/8~' csg ~ 5638' A-34-14 Redril± Platform A 12~000' G Pool D.F. ±16' 13-3/8" csg ~ i565' 9-5/8~ csg @ 5638' 7016/54/i0/109. Drlg. Reamea"~.rom 6844-6913. Dev: 6841' 63 deg S29W, 6903' 65 de $25W, 6955' 65 deg S24W- TVD 5317, V Sec ].094.8, 976.4a 505.67W. Mud: (.525) £0.J. x 43 x 4.8 (~ii 2%) JUN 17 1976 7069/54/11/53. Rill w/junk basket. Ran EYE tools. Oriented & dyna-drld from 7019-7069. POOl{ & all cones off bit. Dev: 7019' 65 deg S24W. Mud: (,525) 10.J. × 42 x 4.6 (Oil 2%) 3Ulq i 8 1~713 7174/54/12/].05. I)rlg, Fi.n'd in hole w/junk basket, Y'U 3 cones & a few rollers, Reamed f]:on~ 7019--7070. Dev: 7067' 64 deg SiSW, 7144' 65 deg S16W. Nud: (.520) I0 x z~3 x 4.6 (O~l ._%) 6/19: 7345/54/13/171.' Drlg. Day: 7235~ 6.5 deg S17W, 7325' 62 deg S16~'~. Hud: (.520) 10 x 42 x 4.6 (Oil 2%) 6/20: 7475/54/14,/130, D]:'Is. RU EYE tools & dyna-drld from 7427-"7475. Der: 7427' 59 deg S17W. Fiud: (.520) 10 x 41 × 4.6 (Oil .'Z) 6/2i: 7535/54/15/60. Run'g DA. Dyna-drJ_d to 7535 & RD EYE tools', Hud: (520) l0 x 40 x 4.4 (Oil 2%) j~.~,{ 2' ::2 i::'.~t:' Platform A ].2~000: C Pool. D.F, 116' 13-3/8'' csg (~ 1565 9-5/8" csg ~ 5638' A-34-J.4 Redrill Plat:form A 12~000' O Pool D.F. i16' .~..,,.~ csg @ 1565 9-~,0 csg ~ 5638' 7669/54/16/!34o Trip'g, Day: 753'!' 52 dog: S!0W, 7574' 5i deg S7W, 7605' 50 de,, S7W-~- TVD 5618, V Sec 1648 53 4287.57$~ 1344.97W~ Hud: (~520) 10 x 52 x 4,8 (Oil 2%) 7958/54/17/289. Run'g: survey. Reamed from 7626-7669', Der: 7669' 50 dag S?W, 7825' 51 deg S7W, Mud: ( ~= " - ,_,/_,,,) .~0.1 x 43 x 4.4 (OiL J.%) JUN 2 4 1978 A-34-14 Redrill Platform A 12,000' G Pool D.F, 116' 13-3/8~ csg @ 1465' 9-5/8" csg @ 5638' . ~,~.2, Dr].g, Day: 7958' 51. deg SN?, $135' 83oo/5~/18/~', 49 deg SSW, 8295' 46 deg S5W -- TVD 6067, V Sec 2.[63.85, 4806 an,, 1408 89W Hud: (.520) lO x 42 x 4.8 (Oil 1%) 8622/54/J..9/~o~' ,,,~z. I)rlg, Dev: 8&22' 44 deg SBW, 8547' 44 deg S6W. Mud: (.520) lO x 45 x 4i;'8 19 t976 ~-34--14 Redrill Platform A 12,000' G Pool D.F. 116' 13-3/8" csg @ ].465' 9-5/8" csg @ 5638' 6/26: 8828/54/20/206. Drlg. ,) from 8692--8765. Mud: (.525) 10.1 x 44 x 4.6 6_~_~: 8986/54/2l/±58. TIH. Dev: 8703' 44 deg S6W, 8862' 42 deg S6W, 8954' 41 deg S16W. Mud: (.514) 9.9 x 41 x 4.8 6/28: 9316/54/22/330. Drlg. Dev: 9111' 41 deg SSW, 9265' 39 deg S6W - TVD 6781.75, V Sec 1552.13, 5458.16S, 1471.96W. ~[ud: (,525) ].0.! × 42 x 4.6 JUN 25 18?'U A.-34,i4 Redrill Platform A 12,000' G Pool D.F. 116' 13-3/8!' csg @ 1465' 9-.5/8TM csg @ 5638~ 9418/54/23/102. Dr]g. Tight slots @ 7967 & 8909; CO from 9266-9316~ Dev: 94J. 8~ 37 deg S6W, TVD 6903.54, V Sec 1649.!1, 5550.26S~ 1481.64W, Mud: (.520) !0 x 43 x 4.6 dUN ~ 0 197'~ A-34-14 Redril! Platform A 12,000' G Pool D.F. 1!6' 13-3/8" csg ~~.~'65 9-5/8" csg @ 5638' 9537/54/24/1i9. Dyna-d~:ig. I,~'ashcd & reamed 9312-9418. Mud: (.525) i0.1 × 46 x 4 Platform A I2,000' G Pool D.F. !16' J.3-3/8~ c,~o' @ .]~6'5' v.-~ csg G 5638' 9645/54/25/!08. Dr!g. Washed & ; ,.amed from 95i6.-9547. Dev: 95].6' 38 deg STE, 9547' 37 deg N78W, 9572' 36 deg S6W, 9635' ~ eo~ V Sec 1778 04, _,, deg ,,,,~ - TVD 7077.54~ . 5678.92S, 1497.19W. , .~ Mu~: (,520) !0 x 46 x 4,8 ,~i~[....~ n~.. ~ ~,.,a'z~.,~ A-34-i4 Redrill P.lat form A 1_2,000~ G Pool D.F. 116' 13-3/8" c°,, @ JZ~65' 9-5/8" csg @~c..:,8~'c"~ ' 9702/54/26/57 Ma].'.'~l up B}!A Day: 9664' TVD 7100 2F~ V cee 796 03~ 5696 79S, i499 7~'v' Mud (,525) _0 ~ x 47 x 4.6 A-34-14 Redrii! P.la t fo~:m. A 12,000~ G Pool D.F. 116' 13-3/8~ csg @. 9-5/8'~ csg @ 5638' 7_/_.3.: 9830/54/27/128, Drlg, Der: 9664' 38 deg SSW, 9702~ 37 deg S12W, 9732' 37 deg Si4W, 9764' 37 deg Sj. 6W, 9826' 37 dag S16b.~. Mud' (~z,) 9 q-~ ','~ "' .......... ~,- x .4 (Oil 3,~,) 7/_ 4.' 9977/54/28/147. Dtrlg. Washed & re. an:ed 9630-9865. ?~ud: (.520) l0 7/6: 10)323/54/30/J_4~.. Drig. Wasl~ed & reamed I0,135-10,205, V Sac 2196.73, 6083.61S, 1605.98W. AND C'- ~[ud: (.520) l0 x 49 x 4 (Oil 24-%) ,~:L"' 0 '[ i876 A---34-14 Redr~ll Plat:form A 12~000' G Pool D.F. ±16' 13-3/8'~ csg @ 1465' 9-5/8" csg @ 5638' 7/7: 10,517/54/31/194. POOl{. Der: 1.0,391' 39 deg SJl. SW, 10,423' 39 deg SZ7W, ].0~485' 40 deg $17W- 'f'VP 7736,82, V Sec 2313,35~ 6.i. 95,22S~ 1641.131'7. Hud: (.520) !0 x 46 x 4.4 (Oil 2qE) 7/8: ].0,6.10/54/32/93. ]bm'5 survey. Der: ].0,546' 4.[ dog S1.5W~ TVD 7982~ V Sec 2353, 6233S, Mud: ( ~'3=~ .o..~) 1.0.3+ x 47 x 4.4 (0:[i 2+Z) JUL [)8 197r: ~-34-14 Redriil Platform A 12,000' G Pool D.F. 116' 13-3/8" csg @ 1465' 9-5/8" csg @ 5638' A-34-14' Redrill P ~ a t fl o ~_' m A 12., O,.")0 ~ G Pool D.F. 1t6~ ~ ~/8'~ cs 6 1465' 9-5/8" csg ~ 5638' Platform A ~2 00n~ G Pool D,F, j..16' 13-3/g" csg @ 1465' 9-5,0 csg ~ 5638' 10,702/54/33/92' Drlg. Dev' 0,671' 41 deg Si4W, Mud: (.556) 10.7 x 43 x 4.6 k~.l 2%) JUL 0 9 197¢ :[J~A2: 10,761154134/59. Dr]g. Hud: (,551) 10.~ × 45 x 4.6 (Oil 2%) 7/~[: 10 ~64/54/35/i03, Drlp;. Der: 10,832' 40 deg .... ' ,4 (Oil !+%) ~md: (556) 10 7 x 47 x 4 7/].2: il,047/54/36/--~3. Drlg. 11,177/54/37/130~ Prlg. Day: 33 deg (q ~,lud: (,556) 10.7 x 48 x 4.G (0ii. 2%) 11,335/54/38/i58. Drig. (Corr to rept ol: 7/13: S/B ii.. lj. 2-11,320. 11~146' "2 d~'g Si6W ) ,~,~",,~,ed & washed from , 1,iUd: (.56i} t0,8 x 49 x 4.4 (Oil 2%) JUL i 4 i87'{'} A-34-14 Redrill Platform A 1.2,000~ G Pool D.F. 1!6~ ~" csg @ t46~'' 1~--~/8'~ ~ 9-5/8" csg @ 5638' ,,.~9/::,~.I-,~/i34. Circle & bidt% mud 577) TM I x 45 x 4 [Q:Li ~.~5~') 11,469/54/40/0 Wash'g t+J"btni .... ~ost.approx i90 bbls mud on trip,- 14ud: (.587) 11.3 x 46 x 4 (OJ.i 2-3/4%) A,-34-!g~ Redrii! Platform A 12,000~' G Pool D,F. 116' 13-3/8" csg @ 1465' 9--5/8~' csg @ 5638' A-34-1.4 Redrill Platform A 12,000~ C Pool D.F. 1.116' 1.3~3/8" csg ~ 1.465'..._ 9-5/8'' csg @ 5638' 7/12: I1,530/54/41/6!. D'rlg, Wasl~ed from JJ.,290-320 32 lost 40 bbls mud. Fmp~d LCM & cleaned from !!, 0-376; lost 90 bb!s mud, 11olc took SO bb.!.s mud while rcl')o, iri~g clutch, CO from 11,376 to btm; lost 50 bbls mud. ])rig w/no mud loss, Hud: (.587} 11.3 x 47 x 4.8 (Oil 2.5%) 7/18: 11,682/54/42/152. Drlg. b~u~: (.577) !1.1 x 47 x 4 (O:li 3%) j~/19.: 11~784/54/43/i02, POOH. Mud: (.582) 11.2 x 48 x 4 (Oil 4%) JUL 11,941/54/44/157. Drlg. CO from 11,660-1.1,784. Dev: 11,784' 34 deg S19W, TV9 8773.26, V Sec 309J..63, 6943.89S. 1858.93W. Mud: (.58~'~) 1.[ 2 x, 45 x 4 (0~1.~ A-34-14 Redrili Platform A 12,000' G Pool D.F. 116' 13-3/8" csg @ 1465' 9-5/8" csg @ 5638' A-34-14 Red rill Platform A 12 ~000' G t).F. itl6' 13--3/8" csg Lq 1465' 9-5/8" csg Lq 5638' ~" 12,046/54/45/105 · Drlg. '~' ~}.~ud: (.5~2) li,2 x 46 x 4.2 (~ ,~'UL Z ~ ~9T~3 12,100/54/46/54. Log'g. RU Schl & ran DIL & Lateral. Tool stop'd Lq 6840, Ran Sonic G!L & tool st.op'd @ 6840'. Mud: (,582) li.2 x 46 x 4.2 JUl 2 2 197G A-34-14' Redri!l I: ~.at form % 12~000' G Pc:oi D ~!?. J.i6 ~ i3-3/8'~ csg @ i465' 9-5/8" csg @ 5638' A-34-14 Redrili Platform A 0~ ~ 12, ~0 G D,iF. 116' i3 3/8'" csg @ i465' 9-.5/8" csg @ 5638' 12 ,100/54/47/0. Logging, Logging throu[;h dril. l pipe, I.iud: (.582) 11,2 x 47 x 4.4, 7/24: ].2,1,00/54/48/0, Pul!in,. Logging, Mud: (.582) 11,2 x 47 x 42, 7/25: 12,!00/54/49/0. Nippling Up. Ran 129 its 7" 29# N-80~ 170 Jts 26#~ 2 jts 25# (Total a.)i jts) Cemented ~;~/.L200 cu~ft. + CFR-2. ~ ~ ...... . , ~ ...... p=~ p!ug with 3500 psi Shoe ~2 12 097 -- F.C. ~ !2~009', Lost 300 bbls mud while cementing. 7/26: 12,100/54/50/0. Laying.down driJ. l pipe. t5 hfs nipp!ing up. JUl, 12,v00' G Pool D.F. 1.I6~ i3-3/8'~ csg ~ 1465' 9-5/8" csg ~ 5638' A-34-14 Redriil Platform A 17 000' C Pool D.F. 116' 1,2-3/8" csg @ I465' 9-5/8" csg ~ 5638' A-34-14 'Redrii± ~' Platform A !2~000' G Pool I).F 116' 12-.~/8' csg ~ 14o~' ~' 9-5/8" csg ~ 5638' 12,{00/54/5i/0, Runhing tubing, Finished logging down 5" drill pipe, N':'~F,Oh~ OF OIL .ANO ,', - TD 12,!00. PB 12~010, Logging. Cite & cond mud. Pulled tbg. ~[ ~8 [~T:' TD 12,J. 00. PB 12~010. Changing to die~'~el. Finished logging. Ran CN-FD CR and CL 15005-5000 CBL 12~025-5500. Top c. ement ~ 8725. Tested csg to 2000 psi - ok. ~' TD 12,100. PB t2,0i0. NipplJng up. changtng out w/diese±. POOH, J:ltu~ prod, equip. per pro-,',-~,-' . ~j,c~:~s. Set Guiberson Packer ~ 10,530' Ereasure. tested tbg to 2250 for 30 m~n A-'.34-14 Redrill ~ Platform A 12,000' G Pool D.F. 116' 13-3/8" csg @ 1465' 9-5/8" csg @ 5638' 7" csg @ 12,i00' .<iD t2,100. PB 12,0J.0. 7/31 Ga' tift'g well. Tested 5ameron tree. Flanged to 4800 ~.,~i & te. sted csg. 8/1 Test'g. Perf'd 11,089-1i,100 (45 holes), 8/2 Kiil'g well. Fin'd gas lift'g well for test. Attempted to retrieve gas valve @ 10,699. COuldn't get retrieving tool below 6800'. Made dummy run w/slick line; retrieved valve. AUG 0 2 19'zB A-34-14 Redrili Plat form A 12,000' G Pool I).F. 116' 13-3/8" csg ~l 1465' 9-5/8~', c~.o~:,> ~ ~638' 7'~ csg ~ 12~I00' A-34-14 Redril.L Plat:form A ~00~ 12~uct G Pool. D.F~ 116 t i3-3/8~' ~,~ coo @ 1465t 7~' csg ~ 12 100' TD 12,.100. PB 'o 010 PulI'g tbg C:Lrc'd w/mt~d & d:fspl'd wtr. Kilted well. Removed tree & tested rams, ]hydr{.1 & ki±i line @ 1500 t)si~ ok. TD !'2~100 ~,~- 1o n n . vlv Circ& tendr~,a' ~c~. Installed :-;el_id plug in tbg hanger. Tested rams to 1500 psi, ok. RIt.i to top of fill ~ 1!,980'' CO to 12 0!0 A-'o~',-14 Radril! Platform A 12~000' G Pool D.F, 116' 13-3,/'q""~ csg ~ ~,,., zoa' = ' 9-5/8~ ~,o~ ~~ ~638' 7 TM csg ~ i2,100' A-34-!4 ]:tee,_ iii Platform A 12~000' G Pool. D.F. 1.!.6' 13-3/8" ess @ 1465' 9-5/8'~ csg @ 5638~ 7" csg @ 12.,lO0' TI) 12~100. PB 12~010. Slip drl line., Tested am-:u.l_us to !000 t>,si~ DP to 3000 & cmt liner to 5000. Pmp'd 30 bbls 15.9 ppg slurry fc,!l'd by 46 bbis mud. Top of cmt {t 10,932. Start:ad sqz'g ~ 3 B/M (~ 2000 t>si & fin'd w/i/4 ~;/i,! ~ 3000 psi. ~:~d i000 psi on annulus during sqz job. (:'~P 6:/,5 p.n~, 8/4. ~g6 05 ~o~ TD 12,100. PB 12~010. Trip'g. WOC 1 hr. Mii.lc.d out ret & CO cmt to 10,916. Could be puah:g junk aide'.ad of mill. Pulled mill. Ran. bit & scraper, A-.-34-14 Redrill &at.~¢ rm /i l?,OnO~ .~ ~; u, Pool D,F. 13-3/8'~ egg ~ 1465 9-5/8" csg ~ 5638' 7" csg ~ 12,i00' TD 1.2,100. PB 12,010. 8/6 Run'g cmt ret. CO ct,at 1.0,916-- t1,106. Tested pe.~:fs to 2000 psi 15 :~'[n~:, ok. (:end for sqz job. Perf'd 4 holes ~ &1,575. g/7 Set ret 0 11,217. P¥ ,-,- , ...... eo~ tested annulus to 1000# & sic eot~p t:o Est breakdown ~ 2 E/Fi w/2000#. Pmp'd 5 bbls dJ.e~:o.l ahead 5 BW behind. Dispi'd 64 bb!s mud leaving 500' of dic~e.i DP. Stung into ret & could not displ cmt. Reversed stung back into ret & ret [ailed. Ran bit 6 four'.d ret 1].,323'; drld out same to 12,0j0. 8/S Shot 4 hol~,.:~ 0 ~].~574. Hole tak'g ntud. Filjcd hole w/45 bb].s. Ron 30 stds. Fii!od hole w/30 bbls; still loosing mud. Set rat 11,310. Pmp~d _s bbls diesel, 114 cu j]t cmt & a~' BW lu,~nd.~ Clearod ret of cmt & reversed out. Sch! shot 4 }~oles 11,210. Reset ret 0 Al,.122'. Lost approx 1.10 l~bls to perfs 0 i1,574'. AUG 0 8 ld/ . ~-34-14 Redrill Platform A 12~000' G Pool D.F. 116' 13-3/8" csg @ t465' 9-5/8" csg @ 5638' 7" csg @ 12,100' TD 12,100. PB 12,010. Trip fr bit. Press'd annulus to t000 psi, DP to 3250 & sfc lit. to 5000; cou.[d not break form down w/3250 psi. Set Howe@ BP ~ 11,070 & press'd to 1000 psi, ok. Schl shot 4 holes ~ 11,020'. Set retainer 0 11,810. " "~ annulus to 1000 psi & DP to 3000; could not break down form w/3000#. PO@ti. AUo ~ n l('' ' A-34-14 Redrill Platform A 12~000? G Pool D.F. 116' !3-3/8~' csg @ 1465' 9-5/8" csg @ 563g' 7'~ csg @ 12,100' TD 12,100. PB 12,010. (Corr. to rept of 8/10/76' Set retainer @ 10,810.) Drilling 'ccta:Lner @ 1.1.,122', Drilled out retainer @ 10,glO' and ]P @ 11,070'. Mud: (,582) ii..2 x 44 A-34-t4 Redrili · Pi. at form A 12,.000~ G Pool D.F. 1!6' 13-3/8'~ cs~ 0 1465' 9-5/8" ass @ 5638' 7" csg @ 12,100' P,~ 12,010 Check's hole. for lost c:[rc, DrJd TI) 12,1.00, ,~ 't, . out ret @ 1i~122. RIH to top of ret 0 1J,3.1,0 & 1)'i~cs:~ t:es:,t'ed to 1500 psi !5 rains, ok. Drld out ret 0 l},3J.(); found top of cmt 0 11~357 . Drld cmt from 11,3.57-11,579. Tented per.['s to_ 12~000 fsi when form l)rk dow::', psi; hole took 40 bbls to fill. A-34-i4 Redrill Platform A. 12,000~ G Pool D.F. 1!6' 13'-3/8" csg @ !&65' 9-1i/g~ ess {} 5638 7'~ ess @ 12,100 TD 12,100. PB 12,010, PU DP. S'x'ab'd 7,5 bt>is. Circ'd cond~d cmt; cor;taminated m,,,,d 0 8766'. RIH w/6" bit scraper; bit stoptd 0 11,589. Cleaned ass from 11,589-650. Fined in hole to i2,010. Circ'd up from btm; mud cut from 11.3-10.7 five rains. POOH~ LD 90 its ALI" A-34-14 Redriil Platform A 12~000' O Pool D.F. !I6' 13-3/8" csg @ !465~ 9-5/8" csg @ 5638' 7" csg @ 12~100' TD ].2~100, PB 12,010. 8/13 Run'g pkr. Well flwd 'wh~Je PU DP. Circ'd gas cut mud; built wt to 11.5#. Hade short trip & well still flw'g; built wt to 11.8#. Rill w/CuJber~;on pkr~ 3-1/2~' tbg & mandrels. 8/J.4 Prep to flw ~2e. J l. Ran tbs w/gas mandra!s. Displ'd 11.7# mud w/filt:erc~d inj wtr. Set pkr ~ !0~870'. Could not shear prop out sub w/4700#. RU to fiw well ~ 1i~575~. 8/t5 Test'g well 0 II,574-75. Fl~,'d & cle~.nedx .~- ' up well 0 11~575 & 1J.,574. Avg fJ.w rate 700--800 B/D ',.::/cut of 80-90% wtr & 10-:-20% oil. Flwd al:pro:: 650 bbls fluid; inj'g i000 NCF. CP 9'70 psi & TF 9.5 psi. A-34-14 Redrilt TD 12,' "". 010 Run' .lO0 PB 12~ o g pkr flow meter te:;t. Fi. wd Platform A well & pulled bail valve. Sheared shear sub w/WL 0 i2~000' G Pool ~ '.. '.i (;~; ~l}0~i~2~:J~'.~-~:l{~ade tag run to 12,210; unab.l.e to get deeper. D.F. 116' ~}J) ~5~; (2J t~tf{Tp~ ~x,, meter test; f~,iled 0 ll,l.50' 9-5/8" cs:g @ 563~~a [].[ ~ ~qTB AU6 ~7 ~976 7" csg ~ 12,100' [1 1, ,~, ,<,,,,, A-34-14 Radrill Platform A 12,000' G Pool D.F. 1t6' ].3-3/8~ csg @ 1~65' 9-5/8TM csg @ 5635~ 7" csg @ i2,.].00' ......... 1D ~.'2,100. I)B 12,0t0. Run'g temp survey & log's. Pkr flow meter indicated fJA.t~fd entry from 1i,210 {~ 720 B/D. Couldn't get took below 11,278. RU slick J. ine &RI]I to fish slnoe 0 J.0,699. RU Sch! & Rill v:/RA j.oS. l,og sl~owed fluid leaving holes 0 11,210. PO@il. AUG ~ 8 ~97~ A-34-14 Redrill Platform A ].2,000' G Pool D.F. ],]..6' ].3-3/8" csg @ 1465' 9-5/8" csg @ 56385 7" csg @ 12,100' A-34-.14 Redrill ]?lat forr.~ A 12,000' G P6oJ. D.F. 116' i3-3/8~ csg @ 1465' 9-5/8" csg @ 5638' 7" csg (~ 12,i00' A-34-14 Redrill Platf orP, 7;. 12,00d' G Pool D.F. 1.16 ~ 13-3/8'~ csg ~ 1465' 9-5/8" csg ~ 5638~ 7'; csg ~ 12,100' A-34-14 Redrill PIatform A 12,000' G Pool D.F. 116' 13-3/8~' csg 9-5/8" ess @ 5638 7" csg (_a 12,!00 A-34-14 Redrill P~txorm A 12,000~ G Pool D.F. iJ~6 ~ 13-3/8'~ csg @ ~6-~%~}}~ 9-5/8'~ csg @ 5638' 7" csg @ 12,100' TD 12,100. PB 12,010. Fin'd~"an'g temp survey. Couldn't get below 11[,240, but log sh, d normal gradient above 11,210. Rec'd valve @ 10,699. Pmp'd 50 bbl.s frh wtr foll"d by ll.8.///gal mud. TP 1450~/. Could prop only ]..6 B/H w/returns going to tester. Held extra 250-300 psi against tbg while circ'g mud. SD w/12.1 ~nud in tbg; had 100 psi back press. Incr'g to 12.3 & circ & tend mud. AUG 1 ~ 1976 TD 12,100. PB 12,0!0. POOl{ w/WL. Cond mud to ]3.3; well dead. Install]ed BPV. Tested BOP & valvc:s on c]fl~ line & kill Iine to prop. NU & tried to unseat pkr; couldn't. Circ & cond mud. R~,I w/Dialog & found free. pt ~ 10 850 (9' above pkr). Cut tbg ~ 10,850. ' ~.]. "'~'~ ,sh. P ' TD~,.l°,,100. PB 12,010. 8/~. POOII wz~.- U f'isi~ g too.l. assyl mill. on Bowen oversilot, bumper sub, jars & 3 DC's. Norked fish free. 8/22 Rill w/OR. I,D fish. NiI]. to 1.I.~300 w/6~ bit & scraper. Hud cut 11.5; some gas & oJ_l. Staged into 11,723 & circ'd. NIH to 12,00~ & found solid Set Bkr BP ~ 11~265. 8/23 Pmp'g cmt, Set cmt r(~t Press'd backside to 1000 psi for 15 ming. Tested DP 5000 psi~ Stung into ret & press'd {o 1000 pai. to 3000 psi L bled off to 2500 in 1 min. Press'd Lo 3500 bled off to 300{. in i min, Pressed to 4000 & bled te 3100 in 1 min. Press'd to 5000 & bled to 3100 in 1 min. Pmp~d 10 bb!s mud ~ 3/4 to ! B/H ~ /}800-5000 psi. Displ'd 21.7 bbls i~to perfs & 5.7 bbls in liP. Press bled to &SO psi from 3750 in 1.5 rains, r .... .... ,~,'.p ci 3/4 blo/.s & pre. ss c,'.m'~e 2200 on DP & 800 on cs~, Reversed out: 6 or 7 bbls. Rill & started drlg out CR. CO IS-20'/hr to !1,185. AUG g 3 1fi7~ TD 12,100. PB 12~010o LD DP. Dr2. d ,':,.ut crnt to J_1,206. Tag~d CI]3P & circ'd btms up. Pmp~d in 30 BW foJ. J.'d by 70 bb!a mud to spt wtr access parrs. Pre. ss'd to 1200 psi. Drld out BP & chased to btm, 'Circ'd hole clean. AUG 2 4 1976 'I1~ 12~I00. PB 12,010. · NU. Ran prod eqt,.ip as per D-~spi Id 12 i mud w/filtered in] wtr, Set FR~' a ]0 ......... ,. ~ o... pmp~d out shear release. Installed };FY & tree, A-34-14 Redrill Platform. A TP 75 psi bc~,o~.-' ~ '~e ~ gas J. ift 12,000' C Pool ':" D.F. J. 16 ' 13-3/8" csg ~ ~/~:" .~ TD 12,1.00. PB 3.2,010. Gas Jilt test'g. Opened bali Ye!ye. AU6 2 6 i870 A-34-14 Redrill Platform A 12,000' G Pool D.F. 1!6' 13-3/8~ csg @ 1465' 9-5/8'~ csg @ 5638' 7" csg @ 12,100' A-34-14 Redrill Platform A 12,000' G Pool D.F. 116' 13-3/g" csg @ 1465' 9-5/8" csg @ 5638' 7't csg @ 12,100' A-34-14 Redrill Platform A 12,000' G Pool D.F. 116' 13-3/8" csg @ 1465' 9-5/8" csg @ 5638' 7" csg @ 12,100' A-34-14 Redrill Platform A 12,000' G Pool D.F. ti6~ 13-.3/8" csg @ ]~465' 9-5/8" csg @ 5638' 7" csg @ i2,100' A-34-14 Redrill Platform A 12,000' G Pool D.F. 116' 13-3/8" csg @ 1465' 9-5/8'~ csg @ 5638' 7" csg @ 12,100' A-34-14 Redrill PlatformA 12,000' G Pool D.F. 116' 13-3/8" csg @ 1465' 9-5/8" csg @ 5638' 7" csg @ ]~2,100' A-34-14 Redrill Platform A 12,000' G Pool D.F. li6' 13-3/8" csg @ i465' 9-5/8" csg @ 5638' 7" csg @ i2,100' TD 12,100. PB 12,010.. Gas li~ ~g & test'g. Perf'd 4 holes @ 11,070 w/steel hollow carrier gun loaded w/6.6 gram chrgs as per prog. AUG 2 7 197~ TD 12,100. PI{ !2,0i0. 8/27 Fin'd test'g holes @ 11,070- 11,071~ Rec'd 78 bbls fluid; well blew dry. Shot 4 holes/ft @ 11,07J.-075 (16 holes) & started test'g. Well Well mak'g ali gas. 8/28 Ferf'd interval !i,060-070 using 6.6 gm hyperdome chrgs as per prog 4 ho]_es/ft. Te:.;ted well; mostly gas. Perf'd 11,049--070 & 11,072-075; 4 hoier;/ft & .33 OD shots. Total of 97 shots using 13.5 gm c]~rgs. 8/29 Tested perfs~ Rec'd 8 bbls fluid. SI ~,;eJ1 & te,,;ted lubrJ.cator to 3000 psi, ok. Perf'd 11,9].8-940 (22~) 4 holes/ft w/6.6 gm hyperdome chrgs. Started test'g we:l!. TD 12,100. PB 12,010. Prep to gas lift. Released rig 1? ~gh~- ~/°0/76 AUG 3 1 1~"'~ TD 12,100. PB 12,010. 8/30 In 7-1/2 hrs gas ~ifted BO~.-,/~'~ouo' '° ~;tr cuts & some ~,mc~.~ Perf'd 11,850---872, 11,828-850 & 11,806--828 ~.~hi].e gas lift'g. 8/31 In 19-1/2 hrs gas lifted 3].0 bbls (2-30% cut) w/75-120# TP. Avg in] rate 100 MCF/hr. SEP 0 I 1976 ... TD 12,100. PB 12,010. In 23 hrs gas lifted 452 bbls fluid (0-3% wtr cut) w/85~100 psi TP. Avg gas ].nj rate !000 MCF/D. (Corr to rept of 9/]./76: Avg in] rate S/B 1000 SEP 0 2 I976 TD 12,100 PB 1.2,010. In 24 hrs gas Jilted 450 BO, .3% ' ' / ~ ~ ~: 'il ~,~ f~.:,~ ~o,,~" ~ , · ~,t~,'c~t ~WJ'~0!!,.~si~ ~P & 560 psi CP Avg gas in] 'd i070 ~C~? N~ g7~&~G~a,vity 33.2. ! 1976 SEP 0 3 978 TD 12,100. PB 12,010. Run'g BHP bomb. In 24 hrs gas lifted 452 BO, .3% wtr cut w/90 psi TP & 560 psi CP. Avg gas inj'd 1070 MCF. GOR 375 & Gravity 33.5. A-34-14 Redrill Platform A 12,000' G Pool D.F. 116' 13--3/8" csg @ 1465' 9-5/8:' csg @ 5638' '" csg @ 12,100' A-34-14 }'ladrill Plati'orm A 12,000' G Pool D.F. !16' J. 3-3/8" csg @ 1465' 9-5/8" csg @ 5638' 7" csg @ 12,100' TD 12,100. PB 12,010. 9/4 ,,un'g BLIPS. 9/5 PuJ. led bomb @ 6:30 a.m. Reran & hung @ 11,600'. Well prod'g on 6/64 chk @ rate of 216 B/D w/.i% BS&W. Opened to 12/64'chk. 9/6 Conrad flw test w/bomb @ 11,600'. Prod'g @ 456 B/D w/1 to 6% BS&W. 9/7 Pulled BHP bomb. Schl perf'd 11,738- 11,760 w/4 Jets/ft, 2-J./2" hyperdome steel hollow-carrier w/6-i/2 gm hyperdome chrgs. Prod'g @ rate of 432-.480 B/D w/.3-.6% cut, Prod'g .5% to 1% emulsion. SEP 0 8 1976 TD~ 12,100.,~, PB-]_2,010. Opened well & began gas lift'g er~ d 11,716-il,738 as per prog. llad no noticeab~e incr. in ~luid prod. Run ¢3 perf'd 11,694-Ii,716 w/wei1 open & gas lift'g. TP i00 psi. Had no tncr Jn fluid prod or wtr cut. Run #4 perf'd J-1,672-1],694 w/well open & gas lift'g. $EP 0 9 I97~: A-34-14 Redrill Platform A 12,000' O Pool D.F. 116' t3-3/8'~ csg @ 1465' 9-5/8" csg @ 5638' 7't csg @ 12,'100; TD 12,100. PB 12,010.. Prod test'g. In 8 hfs prod 597 bbls fluid w/.7% BS&W. SEP ~ 0 ~S70 A-34-±4 Redri!l Plat form A i2,000~ G Pool D,F. ~':' J..£ O 13-3/8~ csg @ !465~ TD 12,.]..00. PB 12,010. 9/j.0 Perf'd J. 1,650-11,672 w/we.Il open & gas ].ift~g as per ~rog,, Opened waiJ & began test'g~ ~arf~d. ~.~.~-',,,,_.~'-r'°°-'~.,_.~650 w/we~l open & ga~.~' J. ift'g a:; 1-,ex. prog. 9/11 Perf~d Jl,606-J.l,628 as per prog. Perf~d as per prog, 9/12 Prod sZab:[lized, In 12 hfs prod 3.13 9-5/8''~ csg @ 5638' BO, 0-.5% wtr cut w/1OO psi TP & 600 psi CP Ay .... ~° i.nj 7'' csg @ 12,100' .... o ~-, .... , SEP ~ 3 1876'ate 1218 MCF/D. (Corr to rept of 9/.].0: Si; 597 B/D fiu:[_d.) A-34-14 Redrill Platform A 12,000~ O Pool D.F. J.J.6' 13-3/8'~ csg @ 1465' 9-5/8~ csg @ 5638~ 7" csg ~ 12,100' A-34-14 Radrill Platform A 12,000' G Poo! D.F. J. 16' 13-3/8~' csg @ 1465' 9-5/8~ csg @ 5638' 7" csg @ 12,100' A-34-J.4 Redrili Plak, form A 12.~000' G Pool D.F. lJ, 6' 13-3/8" csg @ 1465' 9_5/o,, ,: , o csg 0 3638 TD 12,100. PB 12,010. (Repo, rt discontinued until further activity-) . %~ . TD 12,100. PB 12,010. (RRD 9/14/76) 9/14 Prod 598 BO, 6 BW, 1281 HCF inj , ....... 269 C-~~,-O ~ ~ 9/16 I'rod ~ rate of 599 BO, 9 BI9, llJ. 7 MOP inj gas, 205 CO~' ,~- i00 '~'" & 590 CP in 6 hfs 9/J7 Prod ~ rate of 591 BO, 9 BW, 1197 MCF inj gas, 235 COR, 90 TP & 585 CP in 6 h~:s. 9/18 ~" 9 BW 1J_77 Fi(JF ]nj gss, ,:_od 0 rate of 595 BO, , 131 COR, 90 TP & 585 CP in 12 ln:s. 9/21 Prod 0 rate of 596 BO, 6 BW, 33.3 gray,, 1197 HCF inJ gas, 171 COR, S0 TP 6 590 'c76 CP in i2 hrs. SEP 2'? ~,3 , TD 12,100. PB 12~010. (Add'n to rept nf 9/25-27' ali gauses given were based on per day taros.) 9/25 Prod rate of 596 BO/D, 6 BW/D, 12].8 MCF/D inj gas, 117 COil, TP & 590 CF in 12 hrs. SEP 2 8 I,,97(; A.-34-14 Redrill Platform A 12,000' G tool D.F. 116' 13-3/8" csg @ 1465' 9-5/8" csg @ 5638' 7" csg @ 12',100' TD 12,100. PB 12,010. OIL WELL COMPLETE. On 12-hr test 9/25/767 gas lifted (~ rate of 596 BO/D, 6 BW/D, COR .].17, Gray 33.2 A.PI from gross perfs ].1,0!~9--.I.1,075 (1-1C-ltD), 11,600-Ii~760 (HN-HR), ll,806-1.[,872 (ttI?,-ilZ) & 11,918-11,940 (HR-HZ}. Inj'd 1218 MCF/D gas w/90 psi. TP & 590 psi CP. Completion Date: 8/31~/76. Test Date: 9/25/76. Log Tops: GN 10,237 (-10,1.20) GO 10~267 (-~.t0,150) GR 10,728 (-10,6].!) GS 10,771 HC ~ 048 (-i0 9"' _~., . , 31; HD 11~112 (-!0;.995) HE 11,220 (-11~103) FINAL REPORT HF 11,25Ei (-lJ.,14. i) I.t~ 11,330 (-ii,2J. 3) HK 11,397 (-J.J., 280) HN 1i,585 (-.l.I.)468) HR 11,760 (-ii,6z~3) HZ J.l,~TJ (-J_J.~854) .DI.RECTIONA L .,Sg RVEY REPO T PREPARED FOR SHELL OIL COMPAI. IY CALCULATION PROCEDURE' Tangential Magnetic Single Shot; Gyroscopic Single Shot for TYPE OF SURVEY' interval 5725' to 6350 SURVEY INTERVAL· From 5725' To 11784' SURFACE LOCATION' (Original A-34-14); Conductor No. 5 in Leg No. 1: Conductor No. 5 is 5.31 south & 1.72' East of Centerline of Leg No. 1. Centerline o{ Leg No. 1 is 1622' FSL & 435' FEL, Section 11, T8N, R13W, Seward Meridian, Alaska.. ELEVATION & REFERENCE' 116' MSL @ Derrick Floor FIE L D ' Middle Ground Shoal; Cook Inlet, Alaska WE L L No' Platform A A-34-14 Redrill DATE SURVEY JOB No' 002-76 COMPLETED' 23 July 1976 Shell Oil Co., P.O. No. AWR-191994/EAM M I SCEL. DATA ' Bottom Hole Location @ 12100' @ S 15© 05' 01" W. 9032.91TVD 7114.21. South (extrapolated). Closure 7368.05 1917.37 West-217.52' FNL 2350.65' FEL Sec 23 T8N R13W S,M., Alaska. .Telephone.: 907- 274-7671 6617 Arctic Boulevard, Anchorage, Alaska 99502 @ @ @ SHELL OIL- CONPANY F~IDDLE GROUND SHOAL ~iAGNETIC SINGLE SHOT SURVEY DRILLING SERVICES, INC, ANCHORAGE, ALASKA dOB N0.002-76 ..... WELL NO, A-5~-$4RED.RILL COMPLETED ON ?/25/?6 (~ 6&17 ARCTIC BOULEVARD 99502 ANCHORAGE KBE .: 116,0 PAGE 1 TANGENTIAL ~'iETHO0 COMPUTED BY SCS DATA PROCESSING MEAS, TRUE VERT SUB SEA DRIFT ORIFT RECTANGULAR DOG LEG SECTION DEPTH DEPTH DEPTH ANGLE DIREC COORDINATES . SEVERITY DISTANCE, SECTION DISTANCE CORtiECTED TO START @ KOP '~ 5645 ~588,q9 4472,49 ~3 ~5' S 16 W 2777,13 S 698,9g W 0,00 2860,21 5725 q647.23 '551.2~ ~4 15' S 20 W 2850,90 S .1718,51. W 0,00 2917'55 5775 ~682,43 ~566.~5 45 15' S 20 W 286~,26 S 750,65 W 2,00 .2952,81 5825 N717,~6 ~601.16 ~6 0' S 21 W 2897,8~ S '7~5,5~ W 2,07 2988,69 5875 4750.62 465~,62 48 0' S 22 W 2952,29 S 1757,~6 W ~,25 5025,70 5925 4785,58 ~667,58 ~8 ~5, S 22 W 2967,15 S '771.5~ W 1,50 5065,15 5975 ~815.56 4699.56 50 15, S 21 W 5005,0~. S 785,52 W 5,56 5101.~9 6050 ~861,73 47~5.75 52 0' S 26 W 5056,16 S 811,25 W 5,68 5159.86 6100 ~891,12 ~775,12 54 0' S 28 W 5091,87 S 850~22 W 5,11 ~199.57 6150 ~919.44 ~80~,44 55 50' $ 51 W 5127,19 S 851,~ W 5,7~ 6200 q~46.30 ~650.50 57 50' S 52 W ~162,96 S .... 875'79 W 4,5~ 5280,27 6250 ~971.30 ~855.50 60 0' S' 51 W 5200,07 S 896,09 W 5,28 5522,28 6500 ~995.5~ 4879.5~ 61 0' S 51 W 52~7.56 S 918,61 W 2.00 ~56~.70 6550 5019.59 ~905.59 61 15' S 50 W ~275.52-S--9~0,55. W 1,82 659~ 5040,~2 ~92~,42 61 45' S 28 W 5509,7~ S 958,72 W ~,15 6~55 5658.88 ~9~2.88 61 ~5' S 28 W 5540,08 S 97~,85 W 0,06 5~79,17 6528 5103.~8 ~987.40 62 0' S 28 W 5~1~,1~ S 101~'25 W 0,26 ~561,50 6687 5176.28 5060.28 62 45, S 51 W ~555,50 S 1087,06 W 1,75 5698,65 6781 5218.22 5102.22 65 30' $ 29 W 3608,88 $ 1127,~2. W 2.05 5780.91 6841 52q4,76 5128.76 65 45' S 29 W 5655,9~ S 115~,91 W 0,~1 6905 5270.96 5154.96 65 0' S 25 W 5706,87 S 1177,66 W 6,15 5889,18 6955 5292.94 5176,94 65 0' S 2~ W 57~9,92 S 1196,82 W 1,7~ 5955,95 7019 5519.99 5205.99 65 0' S 2~ W 5802,91. S 1220,~2. W 0,05 NOTES': ~ Hole sidetracked at this point. Rectangular Coordinates & True Vertical Depth Determined by Shell Oil Co. Interpolation from original hole magnetic single shot survey. ~ Sperry Sun Gyro Multishot Survey Data at these stations due to magnetic influence on compass from casing in original hole. ~ Section calculated using Course Line Direction of 16.96517° = 16° 57' 55" , 57.14 92.60 128.48 165.49 202.94 241.28 299.65 339.36 379.33 420.06 .462.07 504.49 547.20 585.24 618.96 701.29 838.42 920.70 973.33 1028.97 1075.74 1133.31 TANSENTIAL METHOD MIDDLE GROUND SHOAL MEAS, TRUE VERT SUB SEA DEPTH DEPTH DEPTH 7067 55q0,65 5224,65 71q~ 5372.89 5256.89 7255 5q12,78 5296,78 7525 5q54,69 5558,69 7~27 5506,q5 7551 5570.13 5q54,15 757q 5596,89 5q80,89 7605 5616,61 5500.61 7669 5657,11 55q1,11 7825 5755,28 5639,28 7958 5838,98 5722,98 8156 5955,76 5859,76 8295 6065,71 59q9,71 8~22 6].56.6B 60q0,68 8587 62q6,60 61.50,60 8703 6558.5q 62q2.5~ 8862 6q75,10 6559,10 895q 65~q,00 6~28,00 9111 g662,q9 65q6,~9 9265 6781,75 6665.75 9~18 6903,55 6787.5S 9572 7027,75 6911,75 9635 7077,5~ 6961.5~ 966~ 7100.2~ 698q,2~ 9702 9752 715~,$q 976q 7179,90 7065,90 9826 7229.09 7115.09 9865 7259.71 71~5.71 10016 7577,06 7261,06 10205 7522,90 7~06.90 10~02 7596.~1 7~80.~1 10591 7&Gq.78 75~8.78 DRIFT DRIFT ANGLE OlREC 6q 50' S 18 65 15' S 16 6q 0' S 17 62 15' S 16 59 50' S 17 52 15' S 10 51 50' S 7 50 ~0' S 7 50 .q5, S 7 51 0' S 7 51 O' S 8 q9 O' S 8 ~6 15, S 5 qq 15' S 3 ~ 0' S 6 ~q 15' S 6 q2 q5, S 6 ql 50' S 6 ~1 0' S 5 39 15' S 6 37 15, S 6 56 15, S 6 57 q5' S 9 38 30' S 8 57 50' S 12 57 O, S 57 0' S 16 57 30' S 16 58 15' S 16 ~9 O' S 16 39 50' S 16 41 O' S lq 59 50' S 18 WELL NO Av34~14 REDRILL COMPUTED BY SCS SuRvEy COMPLETED 7/23/76 PAGE 2 DATA PROCESSING RECTANGULAR DOS LEG COORDINATES 'SEVERITY 59~1,35 $ 1255,08 W 2,5~ 5989,55 .S 127&,99.~.W . 1,69 ~066,11 $ 1298,95 W 2,16 ~150,16 S 152~,64 W 2,82 q251,1q..~S.l~8,92~W 8,91 q26q,54 S 1545,02 W 5,75 4288,29 S 13~5,9~ W 3,22 qS~7,q8 S.-1~51,98 W 0,59. 4q57,81 S I~6,75 W 0,16 4560.16 S 1581,1~ W 0,58 ~695,19.S 1~99,85 W 1,12 q807,61 S 1609,8~ W 2,22 q896,11 S 1~1,,.48 W 1,95 .~982,q7.~S~-l~2B,56.W 1,68 5090,75 S 1~.94 W 0,16 5198,06 5258,69 S.1452,59 W 5561.50 S 1461,57 w 0,52 5q58,20 S 1471,75 W 1,21. 55D0,51 S.1'81,~ W.. 1,30 56~0.87 S 1~90,95 W 5678,96 S 1496,98 W 5,72 5696.8, .S ~1~99,50_~W 5719,'7 S 150~,51W 6.99 5756,99 S 1506,67.W ~,56 5755,50~.S_ 151~,98. W 5791,78 S 152q,~9 W 0.80 5814.99 S 1551,0~ W 1,92 5906,35.S..1557,2~.W 0,~9 6021,90 S 1590,~7 W 0,26 $085,6q S 1605.77 W 2.0~ 6137.q8 S 162~,26 W SECTION DISTANCE ~106,75 ~188,5~ ~268,18 .4356,07 ~$7,69 ~5~5.21 ~662,61 ~76q.71 4697,41 5009,77 5095.77 5181,02 5287,88 5q5~o69 5554,~5 5650,11 57~1,0~ 58&8.65 5886,q6 5909,5~ 5927,5q 59q6,79 598q,53 6008,67 6105,69 6225,89 6287,~q · . , SECTION DISTANCE CORRECTED TO START @ KOP 1176.63 1246.54 1328.33 1407.97 1495.86 1577.48 1610.63 1634.19 1688.00 1802.40 1904.50 2037.20 2149.56 2235.56 2320.81 2427.67 2533.63 2593.48 2694.24 2789.90 2880.82 2970.22 3 008.42 3026.25 3049.30 3067.33 3086.58 3124.32 3148.46 3243.48 3363.68 3427.23 3483.83 NOTES: Section calculated using Course Line Direction of 16.96517 o = 16° 57' 55" TANGENTIAL METHOD MIDDLE GROUND SltOAL MEAS, TRUE VERT SUB SEA DRIFT DEPTH DEPIH DEPT~t ANGLE 10425 7689,,7 10485 7756,79 105,6 7782,83 10671 7876,81 10852 7999,2~+ 111,6 82,6,67 11~69 8514.45 1178, (~ 8775.27 12100 9052.91 7575.,7 59 50, 7620.79 qO 15, 7666.83 41 O, 7760.81 ql 15, 7883.2q 40 .50, 8150,6Y 58 O' 8398..5 54 O' 8657.27 54 ~5' 8916.91 34 ~5' DRIFT DIREC S 17 W S 1..7 W S I5 W S 14 W S 11 W S 16 W S 18 W $ 19 W S 19 W ~ELL-NO,.~A~34~I4,REDRILL ..... SURVEY COMPLETED 7/23/76 PAGE 3 COMPUTED BY'SCS DATA PROCESSING RECTANGULAR DOG'LEG COORDINATES SEVERITY 6156,95 S 1629,21 W 1,98 6195,26 S 16~0,92'W 1,21 625~,91.-S..1651,28. W 2,46 6515,88 S 1671,22 W 6~16.52 S 1691,17 W 6602,55..S.I7~.%,~6 W 677~,15 S 1800,27 W 69~,90 S 1858,75 W 711~,21:.S 1917,~7 W 0.56 1,50 1.28 1,29 0.29 0,00 SECTION DISTANCE 636~,~0. 6~0~.~6 6526,76 6650,75 682~,0~ 700q,65 718~.07 7~64,08 SECTION DI ST~zNCE CORRECTED TO START @ KOP 3504.19 3544.25 3584.24 3666.55 3770.54 3963.83 4144.42 4323.86 4503.87 ..... HORIZONTAL DISPLACEMENT 7568.05 FEET AT S 15 5 1 W @- 12 ,'lO(l.. Total "Measured. DeptH. NOTES: ~ Section calculated using Course Line Direction of 16.,~65170 - 16° 57 Extrapolated from 11784" Magnetic Declination used for COOK INLET BASIN, 25° East ./' ~ Date last Directional Magnetic Single Shot Survey taken. CERTIFICATION: The Field Data for this Directional Survey was obtained by K. L. WILLITS for DRILLING SERVICES, INC. ~ This Report is supported by field data records recorded for the interval 5725' to 11784~. Ail magnetic single shot survey film is in the custody of Shell Oil Company. Ail other data included in this Report was customer furnished. This Report is a true and correct representation of the ~ ' borehole location of this well; as determined by the recorded Field Data; to the best of my knowledge. INTERPOLATED DATA, FOR EVEN .i00 FOOT INTERVALS OF:i. TRUE. VERTICAL DEPTH SHELL OI~L COMPANY' SURVEY COMPLETED 7/2.3/76 MIDDLE GROUND SHOAL WELL NO, A-$~+-I~REDRILL MEASURED TRUE VERT, SUB SEA DEPTH DEPTH DEPTH PAGE TOTAL CORDINATES NORTHING EASTING 5658 5800 5950 6115 6509 6520 6759 6971 7207 7418 7578 7756 7896 805~ ~202 8482 8621 8760 8895 9028 9160 9415 9558 9665 9789 9916 10174 10507 10456 10568 10701 4600, 4484. 4700, 4584. 4800. 4684. 4900. 4784. 5000. 4884, 5100. 498~. 5200, 5084, 5500, 518~, 5400, Ii 5284' 5500, 5384' 5600, 5484, 5700, 5584, 5800, 5684, 5900, 5784, 6000. 5884, 6100, 5984, 6200. 608~, 6500. 6184, 6400. 6284, 6500. 6584, 6600. 6484, 6700. 6584, 6900. 6784, 7000. 688~. 7100, 6984, 7200. 7064. 7509. 7184. 7500, 7~84. 7600. 7484. 7700, 7584, 7800. 7684, 7~00. 778~. 2~87,70 S. 702,06 W 2880,97 S 75G,89 W 298~,7~'S 778,64 W ~102,70 'S . 856.09 W ~24~,45..S 922,75 W 5407,95 S 1010,94 W 5575,55 S 1110,61 W '~765,'75 'S 1202,98 W 5966,6~ S 1269,46 W ~512,56 S ~575,96 W 47~2,67 S 1406.~4 W :~84~.,82 S 1~12,92 W 4958,10 S 1417,~1 W 50~5,8~ S 1426,95 W · 5150,70 S 1459,15 W 5220,77 S 1448.60 W 5507'74 S 1457',74 W 5595'~5 S 146~,66 W 5550,99 S 1481,50 W 5622,22 S 1488,99 W 5696,56 S 1499,74 W 5770,11 S 1518,17 W 5845,65 S 1559,85 W 6002,74 S 158~,87 W 6086,91 S 1606,61 W 6165,27 S 1651.75 W 6248,55 S 1655,14 W 6555,56 S 1676,12 W ANCHORAGE MEASUREO DEPTH INTERPOLATED DATA FOR EVEN lO0 FOOT,INTERVALS.OF.., T. RUE,.VERTICALi DEPTH SHELL OIL COMPANY' SU.'R, VEY COMPLETED 7/2.3/76 FiIIDOLE GROUND SHOAL WELL NO, A-~I+...i~+REDRILL PAGE, TRUE VERT. DEPTH SUB SEA .DEPTH i TOTAL CORDINATES NORTHING EASTING 11092 11~59 11695 22059 8200, 8500. 8700, 9000, 8086o, 8586, 858~. 8886, ...... 6§-~?,~O---.S 1729,77 W 6779,00 S 1798,~6 W 689~',01S ~8~0,~8 W 7092,61 S . . 1909,9~ N MEASURED DEPTH !NTERPOLATED~DATA FOR EVEN I00 SHELL OIL COMPANY MIDDLE GROUND SHOAL TRUE VERT, SUB SEA DEPTH · DEPTH FOOT INTERVALS-O~LSUB.-$EA- DEPTH,-, SURVEY COMPLETED 7,/23/76 WELL NO,. A"3~'%qREDRILL PAGE TOTAL CORDINATES NORIHING EASTING 5681 5822 5975 63q2 655~ 677q 7009 72~2 7~5 760q 7762 7921 8078 8226 8366 850~ 86~5 8782 8917 90~9 9181 9309 9556 968~ 9809 9936 10195 10328 10q57 10589 10723 q&16. L~716, q816, q916. 5016. 5116. 52i6, 5316, 5q16. 5516. 5616, 5716, 5616. 5916, 6016, 6116. 6216. 6~16, 6516. 6616. 6716. 6816. 7016. 7116, 7216. 7316. 7516, 7&16. 7716. 7816. 7916. ~500, ~600. ~700, 5000, 5100. 5200. 5300, 5qO0. 5500, 5600, 5700, 5800. 5900. 6000. &lO0. 6200, 6300.' 6~00. 6500, 6600, 6700. 6900, 7000. 7100. 7200, 7qO0. 7500. 7600, 7700. 7800. 2802,.~1~-S ........ 706,66 W 2896,38 S 7~2,65 W 3003,53 S 785.51 W · __3122,~0.~S ....... 8~7,q9 W 3269,31 S 937,69 W · 3~3q,88 S 1025,~ W ................ 3602.Y5-,S ....... 1126,76 W 3795,09 S .3995'8~ S q165,36_S ~287.96 S ~09,190 ~532,1q'S. .~652,1~.S q760,09.S .~858,978 ~950,58.S 50~9,29 S . _51~5,86.S 52~5,~7 S 552~,69 S 5~06,95 S 5~85,75 S 5709,08 S 5781,82 S 5857,91 S 6015,38 S 6100,2~ S 6178,0~ S 6261,80 S 63~7,08 S 1216,93 W 1278,91 W 1329.1~ W 13~5.89 W 1560.76 W 1376.53 W 139~.06 W 1~08,6~ W lq13,88 W 1~18.50 W lq~0.58 W lqqO,73 W lqSO,11 W lq59.21 W lq65,96 W lqT~.6q W lq90,22 W 1501,5~ W 1521.5~ W 15q3,5~ W 1588.50 W 1610.20 W 1655,65 W 1658.75 W 1679,q9 W INTERPOLATED DATA FOR EVEN lO0 FOOT INTERVALS OF_.. SUB SEA DEPT. H SHE.LL OIL CO~PANY' SURVEY' COMPLETED 7/23/76 MIDDLE GROUND SHOAL WELL NO, A-54,,~.4REDRILL MEASURED TRUE VERT, SUB SEA DEPTH oEPTH DEPTH PAGE TOTAL CORDINATES NORTHING EASTING 11112 11357 11712 12079 8216. 8100. .... 6589,&0 .S 8~l&. 8300. 6725,19 S 8716. 8600. &90~,~7 S 9016. 8900. 7105o1.1 S 1.752,,72 1781, ~0 :L8~5,88 :L9'!:~,5~ MEASURED DEPTH INTERPOLATED DATA FOR EVEN 1000 FOOT INTERVALS-OFf-:MEASURED DEPTH SHELL OIL COMPANY SURVEY COMPLETED 7/23/76 ~IDDLE GROUND SHOAL . WELL NO, A-~-lqREDRILL ............ TRUE VERT, DEPTH SUBSEA DEPTH PAGE. 8 TOTAL CORDINATES NORTHING, EASTING 6000 ?000 8000 90O0 10000 11000 12000 q831. 5312, 5866, 6578, 7565, 8128, 8951, q715, 519&, 5750, 6~62, 72q9, 8012, 8855, 3020.,95.S ....... 792,5~ ~787,18 S 1~13,~1 '~592,~7 ,S 1585,66 5288,95. S ..... 1~55,77 5895,9~ ,S 155~,2~ 6521,55 S 171~,~5 7.0&0,51 S 1898,~1 September 23~1980 State of Alaska Alaska 0il and Gas Conservation Commision ATTN Mr. H.W. Kugler 3001 Porcupine Drive Anchorage, .Alaska 99510 Shell Oil Company Gentlemen: Attached are the necessary reports for wells C-24-26 (redrill), A ].2-1 (reperforate), and A 34'-14 (convert to injection). Forthcoming are reports on A 11-13 (P&A) and A 14 A-1. Please excuse the delay. Yours very truly, G.L. Sauer Division Production Engineer Pacific Division EDS' crj Attachments Form No. 10~404 REV.'~3-1-70 -- SUBMIT IN DUPLICATEs. STA'i F OF ALASKA · OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-733-] 0086-01 6. LEASE DESI(;NATION AND SERIAL NO. ADL 1 8756 O,L [-] OAS I--1 None WELL WELL OTitER 2.NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Shell Oil Company Middle Ground Shoal 3. ADDRESS OF OPERATOR 601 West 5th Ave., Suite 810, Anchorage Alaska 4. LOCATION OF WELL Cond. 5, Leg 1 @ 5.31'S and 1.72' @ 1622' RNL and 435' FEL Sec. 11 E from center leg 9. WELL NO. 10. FIELD AND POOL, OI~WILDCAT MGSE. F. G. ! I. SEC. T. R. M. (BO'I-I'OM ttOLE OBJECTIVE) Sec. 23 T8N R13W 12. PERMIT NO. 66-2 13.REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE ,MND ANY OTHER SIGNIFICANq' CHANGES IN HOLE CONDITIONS. 7-10-79 Waiting on wireline @per., new water injection line almost complete. 7-11-79 No report 7-12-79 Pulled five lowermost G.L. valves & ball valve. Preparing to convert to injector. 7-13-79 - 7-14-79 No report Brought Herle kickover tool over from Platform "C" and set No. dummi es. 3 and No. 6 7-15-79 Set ball valve and rigged down. Fabricating injection line for conversion to a water injector. 7-16-79 7-17-79 Removed surface safety valves on fl owline and gas i nj. line. and gas inj. line. Installing water inj. line @ report time. Continued with installation of water injection piping. Removed fl owline 7-18-79 7-19-79 Started putting water down @ 4'00 PM. Final Report.i: inj 3696 Bbls. @ 2900 psi. NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in dup'hcate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. Form 1 0-4-03 REV. -~- 10-73 Submit "IntentionS' in Tripllcate & ,,Subsequent Reports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS {Do not use this form for proposals to drill or to deepen U~e "APPLICATION FOR PERMIT--"' for such proposals.) O,L r-1 ~^s I--1 WELLLJ WELL L--J OTHER NAME OF OPERATOR Shell 0il Company 3, ADDRESS OF OPERATOR 1700 Broadway, Denver, CO 80202 4.LOCATION OF WELL A,~urfac, Conductor 5, leg 1 @ 5.31'S and 1.72'E from center leg @ 1622' FNL and 435' FEL Sec. 11 13. ELEVATIONS (Show whether DF, RT, GR, etc..) D.F. ll6' 14. Check Appropriate Box To Indicate Nature of Notice, Re APl NUMERICAL CODE 50-733-10086-01 6. LEASE DESIGNATION AND SERIAL NO. ADL 18756 7. IF INDIAN, ALLOTTEE OR TRIBE NAME None. &. UNIT, FARM OR LEASE NAME Middle Ground Shoal 9. WELL NO. A 34-14 10. FIELD AND POO~, OR WILDCAT MGS E. F. G. 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) ., Sec. 23 T8N R13W 12. PERMIT NO. 66-2 ~ort, or Other Data NOTICE OF INTENTION TO= TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFFI i~ REPAIRING WELL FRACTURE TREATMENT ~ ALTERING CASING SHOOTING OR ACIDIZING [ I ABANDONMENT* (NOTEt Report results of multiple completion on Well Completion or Recompletlon Report and Log form,) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly stat! all pertinent cletall~ and give pertinent dates, Including estimated date of starting any proposed work. 7-10-79 Waiting on wireline oper., new water injection line almost complete. 7-11-79 No report 7-12-79 Pulled five lowermost G.L. valves & ball valve. Preparing to convert to 7-13-79 No report 7-14-79 Brought MerlekiCkover tool over from Platform "C" and set No-. 3 and No. 6 dummies. 7-15-79 Set ball valve and rigged down.' Fabricating injection line for conversion to 7-16-79 7-17-79 7-18-79 7-19-79 a water injector. Removed surface safety valves on flowline and gas inj. line. and gas inj. line. Installing water inj. line @ report time. Continued with installation of water injection piping. Started putting water down @ 4:00 PM. Final Report: inj. 3696 Bbls. @ 2900 psi. Removed flowline 16. I hereby certify th.a~ the foreg~ true and correct TIT~E.- ~/)7)-/r~77aAr ~Jd/~zp DATE (This space for State office use) APPROVED BY CONDITION5 OF APPROVAL, IF ANY.. TITLE DATE see Instructions On Reverse Side SHELL OIL COMPANY 1700 B ROADWAY DENVER, COLORADO 80202 August 13, 1976 Subject: Shell-ARCO-Standard Middle Ground Shoal A-34-14 Redrill C~w,q /' Mr. O. K. Gilbreth, Jr. State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Gilbreth: Attached are two copies of the Monthly Report of Operations for July, 1976. Yours very truly, For: J. W. Kimmel Division Operations Engineer KWL:ts Rocky Mountain Operations Office Attachments cc w/Attachs: Atlantic Richfield Company Standard 0il Company Amoco USGS Form No. P-4 REV. 3- 1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-133-10086-01 6. LEASE DESIGNATION AND SERIAL NO. ADC 18756 1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME OIL ~-~ OAS ~] None WELL WELL OTHER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Shell 0i1 Company Middle Ground Shoal 3. ADDRESS OF OPERATOR 9. WELL NO. 1700 Broadway, Denver, Colorado 80202 MGS A-34-14 Redrill 4. LOCATIONOFWELL Conductor 5, Leg 1 @ 5.31' S and 1.72' from Center Leg @ 1627' N and 435' W from SE Corner Section 11 10. FIELD AND POOL, OR WIL~AT MGS G Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Section 14-T8N-R13W SM 12. PERMITNO. 75-30 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING .lOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING .lOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. REPORT FOR JULY 1976 Directionally drilled 9537' to 12,100' TD Cemented 129 jts 29# NS0, 170 its 26# & 2 jts 25# 7" csg @ 12,097 w/1200 cu ft Class G w/14% salt, 4% gel & 1% CFR-2 Ran logs thru drill pipe. Cement top @ 8725'. Tested casing to 2000 psi. Prep to perforate 14. I hereby cer~orrect SIGNED TITL~V- Op~rg. ~nEr= DATE 7/!3/76 NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. SHELL OIL COMPANY 1700 B ROADWAY DENVER, COLORADO 802.02 July 1, 1976 Subject: Shell-ARCO-Standard Middle Ground Shoal A-34-14 Redrill Mr. O. K. Gilbreth, Jr. State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Gilbreth: Attached are two copies of the Monthly Report of Operations for June, 1976. KWL: ts Y?urs very tr,u y, ::/, ~/J. W. Kimmel Division Operations Engineer Rocky Mountain Operations Office Attachments cc w/Attachs: Atlantic Richfield Company Standard Oil Company Amoco USGS SUBMIT IN DUPLICATE Form No. P-4 REV. 3-1-70 STAT E 0 F A LAS KA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING _ _ND WORKOVER OPERATIONS $. AP! NUMERICAL CODE 50-133-10086-01 6. LEASE DESIGNATION AND SERIAL NO. ADC 18756 1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME OIL [~ GAS [--'] OTHER None WELL WELL 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Shell Oil Company Middle Ground Shoal 3. ADDRESS OF OPERATOR 9. WELL NO. 1700 Broadway, Denver, Colorado 80202 MGS A-34-14 Redrill 10. FIELD AND POOL, OR WILDCAT MGS G Pool 4. LOCATION OFWELL Conductor 5, Leg 1 @ 5.31' S and 1.72' from center leg @ 1627' N & 435' W from SE corner Section il 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Section 14-T8N-Ri3W SM 12. PERMIT NO. 75-30 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. REPORT FOR JUNE 1976 Resumed operations suspended 12/27/75 Commenced operations 6/7/76 CO cement 5460-5643 Oriented dyna drill Directionally drilled 8-3/4" hole 5643-9537 using EYE tool Reamed occasional tight spots 14. Ihe, ebycerti~t~hf/~~and o~<t// SIGNED' f/''~~--~'~-~/~ff//~e*/~-~'.~~ x~~ TITLE Div, Operso Engr, DATE Jll]y ]; ](~76 NOTE~e~r, on this form~s required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Loff'and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. TELEPHONE (805)648-2751 SHELL OIL COMPANY 196 SOUTH FIR STREET VENTURA, CALIFORNIA 93001 January 13, 1976 O. K. Gilbreth, Jr. State of Alaska Division of Oil and Gas 3001 Porcupine'Drive Anchorage, Alaska.99501 Reference: Shell-ARCO-Standard Middle Ground Shoal A-34-14 Redrill Dear Mr. Gitbreth: MAILING ADDRESS P. O. BOX 92047 WORLDWAY CENTER LOS ANGELES, CA. 90009 CONFER: F Attached are two copies of the Monthly Report of Opera~'i-~ns for December, 1975. Also included are three copies of Sundry Notice (Form 10-403) with our notice of intention to suspend operations due to weather. Yoursvery truly, VJV: j cs Attachments G. T. Karnes Division Operations Engineer West Coast Operations cc w/Attachs: Atlantic Richfield ComPany Standard Oil Company Amoco Form 10-403 Submit "Intentions" in Triplicate REV. 1-10~73 & "Subsequent Reports" in Duplicate STATE OF A~SKA "5. APl NUMERICAL CODE OIL AND GAS CONSERVATION COMMITTEE 6. LEASE DESIGNATION AND SEEM SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL~ WELL OTHER N0~ 2.""NAMEOF OPERATOR 8. UNIT, FARM OR LEASE NAME SHELL OIL COMPA~ MIDDLE GR0~D SHOAL 3. ADDRESS OF OPERATOR 9. WELL NO. ~.0. 30~ 92047 ~0AL~AY Cg~R. [0g A~gT,~ CA 90009 HGS A-34-14 ged~i11 ~. LOCATION OF WELL 10. FIELD AND POOL, OR WILDCAt_ At surface CONDUCTOR 5, LEG 1 AT 5.31' S AND 1.72' E FROM MGS G POOL CENTER LEG 1 AT 1627' N A~ 435' W FROM SE CORER, z~. SEC.,T..R..m..(BOTTOmHOLE~TmnT[~ SECTION 11 SECTION 14, R8N, R13W S.M. 13. ELEVATIONS (Show whetherDF, RT, GR, etc.) 12. PER~IT NO. D.F. 116' (~ bore ~T.I.W ~ 75-30 z4. CheCk Appropriate Box To Indicate Nature of Notice, Re )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~ PULL OR ALTER CASING g-.--J FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Suspend Operations SUBSEQUENT REPORT OF: WATER SHUT-OFF [~ REPAIRING WELL FRACTURE TREATMENT~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form,) 15, DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. DBCEMBER 1975 9-5/8" casing cemented at 5638'o Directionally redrilled well to 11,687'. Cemented 11,404 to 11,250' with fish from 11,404 to 11,687'. Fish at 11,240' to 6971'. Cemented around base of fish with 200 cu.ft, cement. Cemented 5945' to 5460' with 520 cu.ft, cement. Suspend operations 12-27-75, due to weather. 16. I hereby certify t.h~t the foregoing is true and correct (This space'or State offlc~se~ /~)~ ~ CONDITIONS OF ~PROVAL, IF A~: TITLE DIVISION OPERATIONS ENGR. DATE 1/13/76 TITLE ;' ~ ' DATE See Instructions On Reverse Side Approved Copy ,}!~ Returned Form No. P-4 REV, 3- I-?0 SUBMIT IN DUPLICATE STA, _ OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. AP! NUMERICAL CODE ¢~50-133-10086-01 6. LEASE DESIGNATION AND SERIAL NO. ADC 18756 WELL WELL OTHER NONE NAME OF OPERATOR lt. UNIT FARM OR LEASE NAME SHELL OIL ~OMPANY MIDDLE GROUND SHOAL 9. WELL NO. 3. ADDRESS OF OPERATOR · P.O. BOX 92047 WORLDWAY CENTER, LOS. ANGE.LES, CA 90009 4. LOCATION OF WELL CONDUCTOR 5, LEG 1 AT 5.31' S AND 1.72i E FROM CENTER LEG AT 1627' N AND 435' W FROM SE CORNER, SECTION II MGS A-34-14 Redrill 10. FIELD AND POOL, OR WILDCAT MGS G POOL Il. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) SECTION 14, TSN, R13W 12. PERMIT NO. 75-~0 REPORT TOTAL DEPTH AT END OF MONT!I. CHANGES IN HOLE. SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. -REPORT FOR DECEMBER 1975 Drilled 8-3/4" hole from 9750 to 11,687'. Stuck pipe, back off at 11,404'. Cemented 11,404' to 11,250' with 150 cu.ft, cement. Stuck drill pipe at 11,240', backed off at 6971'. Cemented through fish with 200 cu. ft. cement. Unable to wash over top of fish. Cemented 5945' to 5755' with 350 cu. ft. cement. Cemented 5755' to 5460' with 170 cu.fto cement. Suspended operations 12-27-75. 14. ! hereby certify ,h.p,{he ft.b~Jgoing i.~ ~cor~ect S,ONED ~_f--~~ _ ~'' ~~~-~W,TL~DIVISION. , OPE~TIONS ENGR , NOTE-R~ on this form is required for each calendar month, regardle~ of the status of operation, and must bo filed in duplicate with the oil and gas conse~ation committ~ by the 15th of the succ~ding month,unl~ otherwise directS. TELEPHONE (805) 648-2751 SHELL OIL COMPANY 196 SOUTH FIR STREET VENTURA, CALIFORNIA 93001 December 12, 1975 O. K. Gilbreth Jr. State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska: 99501 Dear Mr. Gilbreth: Attached are two copies each of the Monthly Report of Operation: These reports are for the month of November, 1975 on the following well MAILING ADDRESS P. O. BOX 92047 WORLDWAY CENTER LOS ANGELES, CA 90009 ..... ...... Dq, AFT SEC CONFER: fILE: Shell-Arco-Standard Middle Ground Shoal A-34-14 Redrill VJV:gd Attachments You rs very truly, ~. T. Karnes Division Opera~ions Engineer CC: w/attachments Atlantic Richfield Company Standard Oil Company Amoco Form No. P-4 SUBMIT IN DUPLICATE v.~7o~ ~: [t ~J7 ~ ~TATE OF ALASKA ~!= ~::~ B~OtlL~Ai~tD ~ CONSERVATION COMMITTEE .... ~; ._.~.' ~. ,. ..... ~ !.~%/~ REPORT OF DRILLING AND ;I/ RKOVER OPERATIONS WELL ~ WELL 5. APl NUMERICAL CODE #50-133-10086-01 6. LEASE DESIGNATION AND SERIAL NO. ADC 18756 1. OTHER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME SHELL OIL COMPANY MIDDLE GROUND SHOAL 3. ADDRESS OF OPERATOR 9. WELL NO. P.O. BOX 92047, WORLDWAY CENTER, LOS ANGELES CA 90009 MGS A-34-14 REDRILL 4. LOCATION OF WELL CONDUCTOR 5, LEG 1 AT 5.31' S AND 1.72' E FROM CENTER LEG % AT 1627' N AND 435' W FROM SE CORNER, SECTION 11 7. IF INDIAN'ALOTTEE OR TRIBE NAME NONE 10. FIELD AND POOL, OR WILDCAT : MGS G POOL 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) SECTION 14, T8N, R13W, S.M. 12. PERMIT NO. 75-30 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. REPORT FOR NOVEMBER, 1975 WELL: MSG A-34-14 REDRILL Directionally drilled from 5994/974~'. Stuck pipe, recovered fish to 9211'. Plugged back from 9211/9024' with 200 cu. ft. API class G cement. Directionally drilled from 9024/9750'. 14. I hereby certify~4~/thp fo. regoi~g~s true and correct f . SIGNED ..//?i,~ E/~'' /~_~¢~,'~'V"Q4c'q.~'ffv~¢"~'iTg'/LLE~TV'ISION OPERATIONS ENGR. DATE 12/12/75 NOTE-Report on this form is required for each/alendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE R PORT OF DRILLI G WOR OVER OP TtO $ 5. APl NLL",IERICAL CODE ~50-133-10086-01 6. LEASE DI.:SIGNATION AND SERIAL NO. ADC 18756 WELL WELL OTHER NONE 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME SHELL OIL COMPANY MIDDLE GROUND SHOAL 3. ADDRESS OF OPERATOR 9. P.O. BOX 92047, WORLDWAY CENTER~ LOS ANGELES CA 90009 4. LOCATION OF WELL 10. · CONDUCTOR 5, LEG 1 AT 5.31' S AND 1.72' E FROM CENTER LEG 1 AT 1627' N AND 435' W FROM SE CORER, SECTION 11. ~.,. WELL NO. MGS A-34-14 REDRILL FIELD AND POOL, OR WILDCAT MGS, G POOL I l. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) SECTION 14, TSN, R13W, S.M. 12. PERMIT NO. 75-30 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. RE?O. T OCTO E __197_ WELL: MGS A- 34-14 Rigged up 10-17-75. Killed well with 75 pcf mud. Removed 'well hPad, Installed BOPE. Tested Hydril and rams tqi"1500 psi/~ Cut: and recovered 'tubing at 10,161~. Jarred tubing and packer fish free, recovered. Cleaned out to 1].,317'. Cemented 11,314/10,955' with 200 cu. ft. class G. Cemented 10,955/10,861' with 200 cu.. ft. class G~ Cemented 10,861/10,141' ~with 160 cu. ft. class G. Cemented 10,141/9485' with 200 cu. ft. class G. Cut and recovered 7" casing at 5710'. Cemented 5759/5519' with 100 cu. ft. class G. Cleaned out ceme~at 5519/5643'. Directionally drilled new hole 5643/5994'. 14~ I hereby certify]~t the~regoing~ and correct , SIGNED ~_/ .,._.,~ . ,~~ T~TLvDIVISIONOPERATIONS ENGRJ mx;rE 11-12-75 MOTE-Repo~ on this form is required for each calendar month, regardte~ of the status of operations, and mu~ be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unl~ otherwise directS. Form 10-403 REV. 1-10-73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. )~/LLLi-~!WELL GAS 0 OTHER 2. NAME OF OPERATOR Shell 0fl Comlmny 3. ADDRESS OF OPERATOR ~ P.O.Boz 92047, World, ay Centar, ~$ Angeles, Calif. 90009 4. LOCATION Of WELL Atsurface Co~dtl~tor 5, [~!tg i at $.31' S~ 1.72' ]~ from center la8 I al: 1627' 1~' and 435' ~ from SE~ corner, Section 11, T. SS., I. 13~., S.N. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) D.F. at 115' 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 6. LEASE DESIGNATION AND SERIAL NO. .ADZ, 18756 7. IF INDIAN, ALLOTTEE OR TRIBE NAME None 8. UNIT, FARM OR LEASE NAME Htddle Cround Shoal 9. WELL NO. }~S A-34-14 10. FIELD AND POOL, OR WILDCAT 11, SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) I&, T.SN., R.13W., $.H. 12. PERMIT NO. 66-2 3orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF E~ PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT Of: WATER SHUT-OFF r---] REPAIRING WELL FRACTURE TREATMENT~.~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15, DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. Proposal: To abandon extsttn8 A-~-14 well preparatory to redrilltag, 1. Full 2-7/8" tu~ir~ and packers. 2. Cement, in stages from bottom of G pool to 100+ feet above R pool, perforations in pools as follows: a. C pool 11,275 - 10,330' b. F pOOl 10,108 - 10,050' c. E pool 9,617 - 9,572' Fill~lth hea~ymud to 5700'±. Cut and pull 7" e.~stng at 5700'±. Cement fro~belovcut 7" casing to 5600'± preparatory to redrilling. 16. I hereby certify that the foregoing is true and correct TiTLEDiViSiOn Operations (This space for State office./se) x-~ / ,/ T IT LEcoNDiTiONS OF ~ROVAL, I F AI[IY: See Instructions On Reverse Side DATE Proposal: Procedure: OUTLINE 'OF PROPOSED'WORK REDRILL OF WELL NO. 34-14 SHELL-ARCO- SOCAL PLATFORM "A" MIDDLE GROUND SHOAL FIELD COOK INLET,.ALASKA Recover production equipment andplug and abandon existing producing, interval in. Well No. 34-14. Cut 7 inch production at 5700 feet and.recover. Directionally redrill front.shoe of 9-5/8.inch casing at 5638 feet to 12,000 feet as.per · attached target-map. ..' 1o Kill well with 'mud and recover"existing production equipment. .. 2. Set cement plUgs across open perforations..: PerfOrations as 'follows: a. "G" pool, 11,275f10,330' .. b. "F" pool, 10,108/10,050.' " c. "E"'pool," 9,617/9,57-2' · . 3. Fill well with heavy mud. Cut 7. inch production casing at. - . 5700 feet. Recover 7 inch casing.. . · '. .. '4. 'Set cement plug from 5800 feet tO 5600 feet. Use. cl.ass ,,G~, plus '35 percent silica sand. · .. · 5° Dress off cement plug to 5645 feet~ plus or minus. Drill off plug using dynadrill and directionally drill as.per attached target. Use a Water base mud containing 5000 ppm NaC1 and with a fluid loss of 5 cc. .' 6. At T.Df of 12,000 feet, run SP-DIL, SP~BHC, GR-FDC'logs. 7. Run 7 inch production casing to'T.D. .Casing design to be determined pending condition of recovered 7 inch casing. 8. Cement casing with sufficient cement, to obtain annular fill · to 500 feet above upper zone. · 9. Run GR-CBL log. 10.. Perforate and complete as indicated by log results. June 11, lg75 Re: Middle Ground Shoai~S.~ A~34-t4 RD Shell Oil Co~any 75-30 Mr. l~. G. ~Kim .... Shel 1 Oil Company P. O. Box 92047 Worldway Center Los Angeles, California Dear 5ir: Enclosed is the approved application for permit to drill the above referenced well at a location in Section .14, Township 8 N, Range 13 W, SM. Well samples, core chips, and: a mud log are not required. A directional survey is required. Pollution of any waters of the State is prohibited by AS 46, Chapter 03, Article 7 and the regulations promulgated thereunder (Title 18, Alaska _ Administrative Code, Chapter. 70) and by the Federal blater Pollution Control Act, as a~ended, Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. In the event of suspension or abandonment please give this office adequate advance notification so that we may have a witness present. Since. the )4GS A-34-14 well will be plugged and abandoned, a completed Form 10-407 (P-7) will be required within 30 days after the abandonment date, Very tr~ yours, O. K. Gllbreth, Cha'i~n Alaska Oil a~ ~s Conservation ~ittee OKG.~ Enclosure cc: Department of Fish and Game, Habitat Section w/o encl. Oepartment of Environmental Conservation w/o encl. Department of Labor, Supe. rvisor, Labor Law Compliance Division w/o enclo, . TELEPHONE (805) 648-2751 SHELL OIL COMPANY 196 SOUTH FIR STREET VENTURA, CALIFORNIA 93001 June 2, 1975 MAILING ADDRESS P. O. BOX 92047 WORLDWAY CENTER LOS ANGELES, CA 90009 State of Alaska Division of. Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: O. K. Gilbreth Gentlemen: Further to telephone conversations between Mr. Tom Marshall of your staff and our Anchorage production office, please find attached a diagram of the blowout prevention equipment to be used while redrilling well No. 34-14, Platform A, Middle Ground Shoal field. This equipment will be tested to 3000 psi upon installation and periodically thereafter. During the abandonment of the 34-14 original hole we will use the same stack with an adapter flange on the 7 inch casing spool. If there are any further questions please contact myself or Mr. J. H. Smith of our staff. Yours very truly, JHS:jcs Attachment N. G. McKim Agent ~-~7."-O~OL ~ r' ?:,-?"-'-"" ~ ...... ~0~ ~ ~ , . ~ 2 O,: .... ~'3 ~,~o~ '~' i~--'~- ~,~ DIVISION OF OiL AND [ ~ D~ArT ~ ANCHORAGE IHYDRIL G'2~; I - 3,000 DOUBLE SH A_F,~'ER GATE 12 - 3000 12"-3000 TO KILL LINE I $ 3000 CIW RX 57 TO CHOKE MANIFOLD RISER 12"-- 3000 12"- 3000 DOUBLE STUDDED ADAPTER I0"- 5000 ~llxl[ IXl~ 12"-3000 MIDDLE DECK [ 13 3/8 CASING 9 5/s"C ASING DRAWN BY CHECKED BY DATE ,5-50-75 II II II II IIIIIIIII I SHELL OIL COMPANY 3000 PSI BLOWOUT PREVENTER STACK I I SCALE NONE lz.v-,4 I PLATFORM A M.G.S., COOK INLET, STATE OF ALASKA III II I I I I IIJII II III II DIETERICH-POST CLEARPRINT IIX)OH TELEPHONE (805) 648-2751 SHELL OIL COMPANY 196 SOUTH FIR STREET VENTURA, CALIFORNIA 93001 April 16, 1975 MAILING ADDRESS P. O. BOX 92047 WORLDWAY CENTER LOS ANGELES, CA. 90009 State of Alaska Division of Oil.and'Gas 3001 Porcupine'Drive AnchOrage,'Alaska 99501 Attn: O K. Gilbreth' Attached'are two.reqUestSconcerningour Middle'Ground Shoal A-34-14 well. The first' SundrY Noticel0-403 in triplicate, is our request for aban- doning.theexisting.perforated'interValpreparatory to redrilling the well. The SecOnd.is our request:, in'triplicate, to redrill MGS A-34-14 to a new bottom hole location. InclUded with the request to drill are the following: le -PropOsed'Worksheet Target"Map LoCation Plat Filing Fee Cheek for $100.00 JDM:sas Yours very truly, N. G 'McKim .Agent Attachments · cc ' w/attachments Atlantic Richfield Company Standard OilCompany.of'California 'AmocO'Production.Company United'StatesGeolOgical:Survey 2 i::i'.,,.~ ~ ENG ........ h ;:i.:.,':i"-'i .... I I C',:::'t. 2 C:, 'C "... J .... 3 r"':"~'4 ............... ~EV 1 .......... SEC CONFER: FILE: z~m~ tO~ 40! REV. I-I--?1 STATE OF ALASKA OIL AND GAS CONSERVATIO'N ,COMMITTEE PERMIT TO DRILL OR DEEPEN 'Il*, TYP~ 0~' WOI~K DRILL IX1 DEEPEN [] SUBMIT IN (Other mstruct~)~. reverse side) A~ APl 50-1.33-10086-01 _ 6. I.,F_~lI DIIBIGNATION AAWD ,_~-~_l~I., NO. ADC 18756 7. IF INDIAN, AI.,L~ OR TH[BE NAME None 8. UNIT FARM OR LEASE NA~ME Middle Ground Shoal 9. WELL NO. MGS A-34-14 Redrill lO. I~L~,.~D AND POOL, OR WILDCAT MGS, G Pool 2. NAME OF OPERATOR 13, MI!I.TIPLE ZONE Shell Oil Company ADDR~ O~ OP~TOR P. O. Box 92047, Worldway Center, Los Angeles, Calif. 90009 LOCATION OF WELL At surface * See below. Atpr°p°sedpr°d'z°ne430'+ N and 2632'+- W from SE corner, Section 14, T.8N,, R.13W.,_S.M. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 17 miles NW of Kenai, Alaska I1. SEC., T., R., M., (BOq~FOM HOLE OBJECTIVE) Sec 14,T8N,R13W, S.M. 14. BOND INFORMATION: Statewide Oil and Gas TYPE Surety and/or No. TIC 1365'03 15. DISTANCE FROM PROPOSED* LOCATION TO NEAREST PROPERTY OR LEASE LINE, Fr. (Also to nearest drig, unit, if any) 4850 18. DISTANCE FROM PROPOSED LOCATION* TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 1250 NO. OF ACR~ IN LEASE 5120 pROposED D~PTH 12,000 $100.00 [7. NO. ACRES ASSIGNED TO THiS WELL 8O ~ m ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL STAR'E'* June 15, 1975 21. ELEVATIONS (Show whethcr DF, RT, CH, etc.) 115 ' D F. 23. PROPOSED CASING AND ~"EMENTll~G PROGRAM SIZE OF HOLE i ,SIZE OF CASING~ , WEIGHT PER FOOT ~GRAIDE S~I'rlNG D~'rH quantity of cement , .... __ 8-3/4" ..7" '! 26#/ft S-95 6300' Sufficient.. to bring-cmt. . .... ~-3/4" 7" 29#/ft N'80 12,000' 500 ft apove..upper zone ... · * Surface: Conductor 5, leg 1 at 5.31' S and 1 72' E from center leg 1 at 1627' N and '435' W from SE corner, Section 11, T 8N., R.13W., S.M. Purpose: To mbandon producing interval in existing A-34-14, plug back to 5700', cut and pull existing 7" production casing from 5700' to su~e~ ~~E ~~ ~ ~ to new bottom hole location, as noted above. i.~.:~ :' ;~. · ~ IN ABOVE SPACE DI~CRIBE i~ROPOSED PROGRA.M: If ~1 is to dee~n give ~ on present p~Jv, q_~o~ ~_ pro~ 've~ical dept. GI~-bl~[ ~e~eoter-program. 24. I hereby ce.try that thc Forego~g ts ~e ~d Corre~ ANCHO~AGa ~rnrDivision Ops. Engineer (This space for State office use) SAMPLES AND CORE CHIPS [] YES ~NO DIRECTIONAL SURVEY RE~ "~ YES [-] NO CONDITIONS OF APPROVAL, IF AN'Y: MUD LO'C; , [] yES ~ NO SEE TRANSMITTAL LETTER A.P.I. ~CAJ~ COD~ ~0 ,--/.~ - /oo $& ~ o / June 11, 1975 June ll, 1975 I I T. 8 N., R. I$ W., S.M. I0 15 22 23 A-42-11 A-32-11 0 0 A-12-12 0 I I / A-23-12 / 0 i 4::.::.::.::.::.:!~:.:¢::.::.:!:!::.::.:!:¢:~:.::.::::::!?.::::~.:~.!~:~:.:~:.:~.:.:. :: :::.:.:'.:'.:::'.:.:.:.:'.:'.!.:'.:'.:'.:.:.:./. ................... 14 / ADL 18756 /a-~-~4 / A-42-~40 ~ 0A"33-14 A- 34-14 RD(:~_~ 2632' ----*,.. 14 14 C-31-25 0 23 C-41-23 0 C-25-Z3 C-43-23 0 0 ADL 18754 13A- n - ~3 0 - 430' 24 LOCATION OF CONDUCTOR 5, LEG I PUBLIC CONDUCTOR § LEG I LOCATED 5.31'S AND 1.72'E FROM CENTER LEG I CENTER LEG I LOCATED 1627'N. AND 435'W. FROM THE S.E. COR. OF SEC. II T. SN.,R. 13W., S.M. LOCATION OF PRODUCING ZONE WELL A-34-14 RD LAND DESCRIPTION 430' N. AND 2632'W. FROM THE S.E. COR. SEC. 14, T. SN.,R. 13W., S.M. DRAWN BY SCALE I": 2000' SHELL OIL COMPANY ZV-- DATE 4 - 18 -75 LOCATION OF SHELL-ARCO- STANDARD WELL A-34-14 RD. IN SEC, II T. SN,,R.ISW., S.M.- COOK INLET- STATE OF ALASKA I I II I I I O I t:TER I CH-pOIdlT CLEARI~I NT ,,,I Proposal: Procedure: OUTLINE 'OF PROPOSED'WORK · REDRILL OF WELL NO. 34-14 *· SHELL-ARCO-SOCAL PLATFORM "A" " MIDDLE GROUND SHOAL FIELD COOK INLET, ALASKA .. Recover production equipment and plug and abandon existing producing, interval in Well'No. 34-14. Cut 7 inch production at 5700 feet and rec'over. Directionally redrill front.shoe of 9'5/8 inch casing at 5638 feet to 12,000 feet as.per · · attached target' map. · · · - . 1. Kill well with'mud and recover existing production equipment.' .. · 2. Set Cement plugs across open perforations.': Perforations as -follows: ~... a.. "G" pool, 11,275/10,.330' b. "F" pool, 10,108/i0,050.' c. "E" 'pool, '. 9,617/9,57.2' .. . ' · , . 3. Fill well with'heavy mud. Cut 7. inch.production casing at.. . 5700 feet. · RecoVer 7 inch casing.· '4. 'Set cement plug.from 5800 feet tO 5600 feet.· Use. Cl.ass ,,G~, plus '35 percent silica sand. '~ · .. .. 5. Dress off cement plug to 5645 feet,, plus or minus. Drill off plug using dynadrill and directionally drill as-per' .attached target. Use a Water base mud containing 5000 PPm NaC1 and with a fluid loss of 5 cc. · · 6. At T.Df of 12,000 feet, run sP-DIL, SPLBHC, GR-FDC'logs. · . . 7. Run 7 inch production casing to T.D. Casing design to be · . determined pending condition of recovered 7 inch..casingl 8. Cement casing with sufficient cement~to obtain annular fill to 500 feet above upper zone'. 9. Run GR-CBL log. 10.. Perforate.and complete as indicated by log results. '~ICK OFF po/~T 27_~I' 68g' .5~. /-cc. ! I I I I I 7'vD °~ z°//oo' .?013 ' .. , )R 'NEW'. WELL PERMI · . Is the "permit' fee .'attach~'.~'.. -. . '.. Is well to be. located i.n a defined pool . . .~ .... . ....... o . No. Rema'~k~ ..... Lease & 'well l.. Is a registered survey, plat attached ........... . ..... · . ~.. Is.well located proper distanCe from property line .......... ~ i. Is well located prop,er distance from other wells . . '~ ....... . ~ i. Is sufficient undedicated acreage available in thins~ pOol ...... ~ '. Is well to be deviated ....................... ~ I. Is operator the only affected party ................ ~ ~'.'.~ }. Can permit be appro,~ied before ten-day wait ' . .... . ...... ~'~'~"~ ~' ), Does operator have a bond in force ................. _ /~ . Is a conservation o~'~er needed ............... .... -L !'. Is administrative apprOval needed ................. I. Is conductor string provided . .- .................. !. Is enough cement used to circulate on conductor and surface .... /~ i. Will cement tie in surface and intermediate or'production strings . i. Will cement cover all known productive horizons .......... ~ Will surface casing protect fresh water zones ........... ~. Will all casing give adequate safety in collapse, tension & burst . ~. Does BOPE have suff~c~e t p es ure r ~n ·" ' '~ , ' ' . - " ~' ~ _ Approval Reco~ended: ~ditional '' .... ~' ' "' ' ' · . ~. / . m ~-' , ,~J-- ' ' --' ' ~ ~' ~ ' ~ ' . . Requirements. ,', ~' ~ ~, - ~/~ ~-,,~ ~-~ ...... ~ J~ ~, ~ ~-~,~ ~~ ~?~,~ ~'~,GeOlo~y Engineering: ' ~~ ..~. ~ ~~ ~/~/7.~~ /~~, ~t, ~'TRM "WK ~.~. OKG HHH JAL ~'~ LCS Revised 1/15/75 .....