Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout176-067PLUGGING
& LOCATION
CLEARANCE
REPORT
State of Alaska
.ALASKA OIL & GAS CONSERVATION COMMISSION
· .
..
PTD No. ~6-067
Memorandum To File: AP! No.
Well Name
Note casing size, wi, dep~, =t vol, & procedure.
Liner:
Perf intervals - tops:
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
Well head cut off:
Marker post or plate:
Location Clearance:
Conclusions
Code
:
Amoco Production Company
P.O. Box 779
Anchorage, Alaska 99510
G, J. Ross
Area Superintendent
December 9, 1976
File: GJR-921-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Open Hole Logs
MGS 17595 Well No. 9 Redrill
Please refer to our letter of November 18, 1976, File: GJR-867-WF,
submitting the Well Completion Report, Form P-7, for MGS 17595 Well
No. 9 Redrill. Attached are the open hole logs for the subject well.
Your~ very truly,
George J. Ross
Area Superintendent
GAS
Amoco Production Company
P.O. Box 779
Anchorage, Alaska 99510
G. J. Ross
Area Superintendent
November 18, 1976
File: GJR-867-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Well Completion Report P-7
MGS 17595 Well No. 9 Redrill
Please refer to our letter of November 5, 1976, File: GJR-826-WF, sub-
mitting Form 10-403, Subsequent Report of Abandonment of MGS 17595 Well
No. 9 Redrill. Attached is the State Form P-7, Well Completion Report,
a chronological well history, and the final directional report for the
subject well. The logs will be mailed as soon as the final prints are
available.
Yours very truly,
George J. Ross
Area Superintendent
Attachments
}.'(~rr'u J:'. 7
SUBMIT IN DUPLICATE*
STATE OF ALASKA (See other in-
structions on
OIt AND GAS CONSERVATION COMMITTEE reverse si(tel
i
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
b. TYP~ OF COMPLETION:
x~:w [~r,v~w°nI< ~ DEEP-l---lEX nACKrt't° [~ ~vr.nSSVR. ['--] OtherPlUg. & Abandon
W El,I,
NAME OF OPERATOR
Amoco Production Company
3. ADDRESS OF OPERATOR
P. O. Box 779, Anchorage, Alaska 99510
4. LOC^TION OF WELL (Report location clearly and in accordance with any State requirements)*
At~urtaee Leg 1, Slot 5, MGS Platform Baker, 1934' FNL, 544'
FWL, Sec. 31, T9N, R12W, S.M.
At top prod. interval reported below
N/A '
At total depth
5000' FNL, 2166' FWL, Sec. 30, TgN, R12W, S.M.
I E~EVATIONS (DF,RKB
13. DATE SPUDDED 14. DATE T.D. RF-J~C~D [15.' Dk'r~ CO,1VLP SUSP O/{ ABANI). ltl.'
!
9-3-76 10-17-76 } 10-22-76 79.4 MSL-KB
,,
9944'/9473' TVD 844'/6493' TVD [ aowy,_~¥, N/A RO~OO~
5. API NUiViE~ICAL CODE
50-133-10076-01.
6. LEASE DE~iIGNATION A2qD SERIAL NO.
ADL 17595
IF INDIA.N, ALLOTTEE OR TRIBE NAME
8. -JNIT,FA.H.[VI OR LEASE NAME
MGS 17595
9. WELL NO,
No. 9 Redrill
10. FLED AND POOL, OR WII-A')CAT
Middle Ground Shoal
11. SEC., T., R., M,, (BOTTOM I-IeEE
OtBJECTIVE)
Sec. 30, T9N, R12W, S.M.
12. P~I/VIIT N'O.
76-67
RT. GR, ETC)*~17. ~. CASINGHEAD
I 46.8 MSL
INTERVALS DRILLED BY
0-9944 ' ! C,,,~L~, ~ooI.,s
23. ~VAS DIRECTIONAL
SURVEY NfADE
22. PRODUCING II'~'I'EHVAL(S), OF THIS COMPLETIO~q--T(XP, BOTTOM, NAME (M'D AND TVD)*
N/A
Mag. S.S.
l(attach~d)
24. TYPE ELECTIIIC AND OTHER LOGS RUN
Cz~SLN G SIZE
9-5/8"
CI~'~LNTINC- RECO!RD A~OU/XIT PULLED
DIL-SP, BHC Sonic-SP, FDC-GR
__
- ' CASING RECORD (Report all strings set in well)
\VEIGHT, LB/FT. ~ GR~kDE J DEPTH SET (NLD) HOLE SIZE
43.5 !S-95 , 39.6' 12-1/4"
40.0 IN-80 i 938.6' 12-1/4"
40.0 ! S-95 6567.0' 12-1/4"
[ 43.5 I 6843.7' 12-114"
LINER 1R~COL:LD
750 sacks Class G
26. 27. TUBING 1RECOFJ])
SIZt~ TOP (MD) BOTTOM (MD) SACKS CE%{Ei~T' SCT~EEN (MD) SIZE
DEPTH SET (MD) [ PACtIER SET (MD)
28. PERFORATIONS OPFiN TO
(interval, size and number) 29. ACID, Si!OT, Yi~A.C~'URE, CEC~II~NT SQUE_~ZE, ETC.
D]~k~TIi INT]~V.~L(MD) AMOUN'F AND t<IND OF MA~EP~IAL USED
None ~,
PmODucrio~
DATE FiI~MT PllODUCTION ! PI~ODUCTION MEIHOD (Flowh~g, gas 1if~, pumping--size and type of pump) ![}[~.~!~l~ .!~g .~ ~ (~. c~r~io~r
m ' ~nUt-m) ..........
i
DATE TEST, CHOKE SiZE OIL--BBL. WATER--BBL. GAS-OIL R~%TIO
FLOW, TUBING CA~ING PRESSURE [cALCULATEI) OIL--BBL. GAS--1~CF. WATER--BBL. [OIL GRAVIT¥-A~'I (CO1RR%.)
1
31'. DISPOSITION OF GAS (Sold, used/or/ueI, vented, etc.) [T~ST WIT~rSSED ~Y
32. LIST OF ATTACHMENTS
Directional Survey
33. I hereby certify that the foregoing an.l~! attached Information l~ complete and correct a8determined from allWavallable records
~¢' ~ /~._~z~f5 Area Superintendent
..... Z'~ ~' ! -- ,~ -~;,'~.t,~.k.,,,~..~ TITLE 11--18--76
SIGNED, ~, //~' -~i- DATE
*(See Instructions and Spaces [or Additional Data on Reverse Side)
General: This form is designed for submitting a complete arid correct ,.,,,.eli completion report
all types of lanJs ar'~d le¢~ses ~r~ Al,~ska.
Item: 16: Indicate wh,ch elevation is used as reference (,,,vhe~e riot otherwise .~hovvr~! for depth measure-
merits .cj,ven ~n tiber si>ices on this forr~
Items 20, ~nd 22:: If tJ~is well ~s (:omp!etecJ for separ,~tc !)r.:-ct~;cti.'~n '~ror-~ r"~orc' than one ~mterval zone
(mull~pJe completior~), so state ~n ~ten~ ?0 ,trod tr~ ~to": ?g s~o.'~ t~: [>'d..~,<.: ~1 JntcrvdJ, or t~terv3ls,
top(s), bottom(s) and name (s) (if any) for only the ir~tor~.J[ rol)c~rled ir~ iter~ 30 S~hm,t a separate report
(page) on th~s form, adeQ,uately identified, for each 8ddJllor/dl ~mt~v~t to be seperately prodt~cer~, show-
~ng the a~itional data pertinent to such ~nterval.
Item26: "Sacks Cement": Attached supplemental records for this well ~houlJ show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately producsd.
(See instruction for items 20 and 22 above).
, · ,
34. SUMMARY ()F I"OII. I~IATII.)N 'I'I~2~'I','.; IN('I.Lll)IN(; IN'I'IqltVAL TF~TEI). I'II'E,%,,$UIIE DATA AJWD .R~C()VF2IIIF~ ()F ()IL GAS.
35 G IgOL,OG IC
WATER AND MUD
.,
I~AM~
M±ddle Kena± San&
State A 5726 5418
State B 6257 5925
State C 6766 6411
State D 7295 6920
State E 7715 7327
State F 8557 8139
,,v , ' , ,,,,, Conglomerate
~8. ¢'~I'~ DATA. ^'I'I'AcII I-1IIlEI;' D~CR'Jq~iTIo'BT.'g O1~ LITilOL. OG¥. PO.I1OSJT¥. I~I,IAC"I'IJR~,,~i AppA-RE'NT' Di'I~S; · ·
,~N'L~ D'F_TFECTgl) SIIOWS O~ OIL, GAng Oil
~ , State G 9562 9'104
,,
Chronological Well History
Amoco Production Company
MGS 17595 Well No. 9 Redrill
September 1-2:
September 3:
September 4:
September 5:
September 6:
September 7-13:
September 14-15:
September 16:
September 17-19:
September 20-23:
September 24:
September 25-27:
September 28-30:
Cut existing 9-5/8" casing at 2175' with jet cutter
and circulate with filtered Inlet water. Increase
weight to 9.0 ppg.
Pull 2175' of 9-5/8" casing.
Trip in with open end drillpipe to 2175' and spot
hard plug. Tag hard cement at 1838'. Run 13-3/8"
casing inspection log.
TD 2069'. Drill hard cement to 1896'. Circulate,
test 13-3/8" casing to 1000 psi for 30 minutes,
okay. Test Hydril, manifold, kill line and choke
line to 3000 psi, okay. Drill 12-1/4" hole.
TD 2205'. Drill 12-1/4" hole to 2205'. Fill pits,
mix mud and displace hole with LSND mud system.
TD 5200'. Directionally drill 12-1/4" hole to
5200'. Test rams and manifold to 3000 pSi, test
Hydril to 1500 psi, all okay.
TD 5727'. Directionally drill 12-1/4" hole.
TD 5948'. Dynadrill 5825' through 5948'.
TD 6625'. Directionally drill 12-1/4" hole to
6625'. Begin to trip out, experienced salt water
flow. Trip in to bottom and increase mud weight to
9.7 ppg.
TD 7119'. Drilling 12-1/4" hole. Mud weight 10.3.
Test BOP's, manifold and rams to 3000 psi, Hydril to
1500 psi, all okay. Trip in with dynadrill.
TD 7220'. Dynadrill to 7162', trip in with bottom
hole assembly and directionally drill 12-1/4" hole.
TD 7618'. Drill 12-1/4" hole.
TD 7752'. Drilling with dynadrill.
Chronological Well History
Amoco Production Company
MGS 17595 Well No. 9 Redrill
Page 2
October 1-18:
October 19:
October 20:
October 21:
October 22:
October 23-24:
TD 9944'. Directionally drill 12-1/4" hole.
TD 9944'. Log to TD with DIL-SP, BHC Sonic-SP,
FDC-GR logs. Hole tight on FDC run.
TD 9944'. Trip in with bit to condition hole. Ream
9890-9940' and pipe torqued. Twisted off at 1633'
and backed off at 1100' and 9480'. Recover one
fish.
TD 9944'. Recover second fish, third still at TD.
Spot 100 sacks of Class G cement + additives at
9081'. Top estimated to be at 8950'. Pull 18 stands
and circulate. Spot 100 sacks of Class G + addi-
tives at 7392'. Top estimated to be at 7250'. Pull
5 stands and circulate. Spot 200 sacks of Class G
cement + 15% sand at 7113'. Top estimated to be at
6850'.
Rig up and run 9-5/8", 43.5# and 40# S-95 and N-80
Buttress casing as follows:
Size Wt/Ft Grade Interval (KB)
9-5/8" 43.5# S-95 Buttress 0-39.6'
40.0# N-80 Buttress 39.6-938.6'
40.0# S-95 Buttress 938.6-6567'
43.5# $-95 Buttress 6567-6843.7'
The 9-5/8" casing was landed at 6843.7' and cemented
with 750 sacks of Class G cement + additives.
NOVEMBER 4, 1976
',~OCO MGS 9 ~
'A,G*IETIC SINGLE SHOT METHOD OF SURVEY K, B, ELEV, 79,4
"ADIUS OF CURVATURE METHOD OF COMPUTATIONS
f2'~PuTED FOR HAROLD BROWN BY F, M, LINDSEY AND ASSOCIATES,
FT.
RECORD OF SURVEY
ALL CALCULATIONS PERFORMED BY I B Ni ELECTRONIC COMPUTER
TRUE
N~FAS, DRIFT VERTICAL SUB DRIFT
9EPTH ANGLE DEPTH SEA DIREC
D ~ DEG,
0 0 0 0.00 -79.40 N O.OOW
243 0 0 243.00 163.60 N O.OOW
3!6 ! 0 315.99 236.59 N85.00E
~00 ! 30 399.97 320.57 S60.OOE
446 0 SO 445.96' 366,56 sgo,ooE
509 0 SO 508.96 429.56 SSO.OOE
605 0 45 604.96 525.56 NED,OOE
621 ! O' 620.95 541.55 N57.OOE
651 2 0 650.94 571.54 NSO,OOE
604 S 0 6R3.91 604.51 NTO.OOE
7]5 4 0 714.85 635.45 N64.00E
747 5 15 746,75 667,35 NSI,OOE
8]0 6 45 809.40 730.00 N46.00E
843 7 30 842.15 762.75 NSO.OOE
875 9 0 871,83 792,43 N52,00E
905 10 15 903,38 823,98 N54,00E
936 11 30 933.83 854.43 NEO.OOE
1032 !3 15 1027.59 948.19 N44.00E
1096 14 45 1089.69 1010.29 N46.OOE
1191 17 15' 1181.00 1101.60 N54.00E
1285 19 15 1270,27 1190,87 NSI,OOE
1385 21 45 1363,93 1284.53 NSO,OOE
]~R5 25 SO 1455.53 1376.13 N49,00E
15~4 2~ 0 !543,93 1464,53 N48,00E
' ~=.66 45.26 8.00E
TOTAL COORDINATES C L 0
DISTANCE
0,00 S 0,00 W
0.00 S 0.00 W
0.42 N 0.39 E
0,03 N 2.15 E
0,1~ $ 2.91E
0,21S 3.46 E
0.00 N 4.46 E
0.14 N 4.66 ~
0,42 N 5,39 E
0,79 N 6.78 E
1,53 N 8,52 E
2,92 N 10.69 E
7.28 N 15,62 E
10,02 N 18,66 E
12.73 N 22,00 E
15,95 N 26,28 E
19.55 N 30,89 E
33,57 N 45,92 E
44.52 N 56.87 E
61,33 N 76,91 E
79,25 N ' 100.26 E
101,53 N ..!27,28 E
127,55 N .157.75 E
157.07 N 191.12 E
187,94 N 225,4i E
S U
RES
ANGLE
D ~I S
0,00 S 0 0 0 W
0.00 S 0 0 0 W
0.58 N 42 30 0 E
2,15 N 89 0 27 E
2,92 S 86 42 17 E
3.47 S 86 26 7 E
4.46 N 89 56 13 E
4.66 N 88 15 45
5.40 N 85 28 2
6.82 N 83 16 29
8.65 N 79 45 54
11.08 N 74 42 58
17.23 N 65 0 13
21.18 N 61 45 55
25.42 N 59 57 11
30.74 N 58 44 46
36.55 N 57 40 10
56.89 N 53 49 57
72.23 N 51 56 47
98.38 N 51 25 44
127,80 N 5! 40 32
162.82 N 51 25 21
202,87 N 51 2 35
247.39 N 50 35 6
293,49 N 50 i0 ~4
DOG LEG
SEVERITY
DEG/IOOFT
0.000
0.000
1.370
0.596
2,174
0.138
0.261
1.563
3,335
3.031
3.22~
3,921
2.383
2,282
5.003
3,911
4.065
1.852
2,352
2,734
2.156
2.504
3,755
2,535
3.763
DISTANCE
0.00
0.00
0.57
1.29
!.58
1.86
2.62
2.85
3.51
4.63
6.25
19.07
23.23
28,35
3~,97
5a.15
69.~5
94.83
123.05
156.95
195.91
239.41
284.55
RECORD OF SURVEY
ALL CALCULATIONS PERFORMED BY I B N ELECTRONIC COMPUTER
VFAS,
~E~TN
17'~
1879
!97~
295o
2!17
225'
2410
2535
2692
2879
2972
.3253
3~39
25~1
392t
3965
4 ! 04
4261
4415
4828
B076
5109
5262
5367
5637
5700
TRUE
DRIFT VFRTICAL SUB DRIFT TOTAL COORDINATES C L 0
ANGLE DEPTH SEA DIREC DISTANCE
D M DEG,
33 15 1714.18 1634.78 N47.00E 226.29 N 267.26 E
33 0 1794.58 1715.18 N48.00E 261.73 N 305.93 E
32 30 1873,63 1794,23 N46.00E 296.41 N 343,12 E
33 15 1915.63 1~36,23 N47,00E 315.09 N 362.81 E
33 15 1945.73 1866.33 N46,00E 328,68 N 377.13 E
32 15 1994.51 1915.!1 N48.00E 350.07 N 400.07 E
29 45 2114.5t 2035.11 N47.00E 398.78 N 453,23 E
25 0 2250,33 2170,93 N48.00E 446.30 N 505.08 E
20 15 2365,68 2286.28 N48.00E 478.47 N 540.81 E
IX 30 2513.78 2434,38 N46.00E 513.98 N 578,90 E
21 30 2689,49 2610.09 N47.00E 558.00 N 625,28 E
22 30 2775,71 2696,31 N48,0OE 581.54 N 650,97 E
2! 30' 2893.47 2914.07 N4e.OOE 613.37 N 686.32 E
20 0 3037.47 2958.07 N46.00E 650.58 N 726,22 E
19 0 3212,80 3133.40 N46,00E 693,71 N 770,88 E
17 0 3395.39 3315.99 N48.00E 734,17 N 814.27 E
15 15 3577.91 3498,51 N45,00E 770,49 N 852,54 E
12 30 3717.70 3638.30 N45.00E 794.90 N 876.96 E
12 0 ~853.53 3774..13 N38.00E 816,98 N 896.49 E
13 30 4006,66 3927.26 N39,00E 844,10 N 918.06 E
15 30 4155.74 4076.34 N39,00E 874.06 N 942,32 E
16 0 4553.24 4473.84 N35,00E 963.57 N 1009.78 E
15 30 4791.92 4712.52 N28.00E 1020,93 N 1044,93 E
15 0 4823,76 4744,36 N28.00E 1028,60 N 1049,00 E
.
16 30 4971,72 4892,32 N26,00E 1063,30 N 1066,69 E
15 0 5073,26 4993,86 N24,00E 1087.53 N 1077,98 E
15 30 5243.06 5163,65 N24.00E !129.82 N 1096.81 E
!5 0 5333.53 525a,13 N24.00E 1153.13 N 1107.19 E
!5 15 5394.05 531a.65 N24,00E 1169,12 N 1114,31 E
S U
RES
ANGLE
D M
350,19 N 49 44 41E
402.62 N 49 27 8 E
453.42 N 49 10 39 E
480.53 N 49 1 34 E
500.25 N 48 55 36 E
531.61N 48 48 46 E
603.69 N 48 39 22 E
674,01N 48 32 8 E
722.08 N 48 29 59 E
774.15 N 48 23 56 E
838.06 N 48 15 14 E
872.90 N 48 13 26 E
920,47 N 48 12 44 E
975.02 N 48 8 40 E
1037,06 N 48 0 58 E
1096.38 N 47 57 40 E
1149.13 N 47 53 39 E
1183.61N 47 48 35 E
1212.91N 47 39 24 E
1247.13 N 47 24 12 E
1285,29 N 47 9 8 E
1395.75 N 46 20 28 E
1460,88 N 45 39 55 E
!469,16 N 45 33 45 E
1506.13 N 45 5 27 E
1531.27 N 44 44 50 E
1574,64 N 44 9 2 E
~598.62 N 43 50 8 E
1615.09 N 43 37 30 E
DOG LEG
SEVERITY
DEG/IOOFT
1.675
0,404
0.813
1,616
1.523
1,984
1.794
3.107
3,800
1.122
1.606
1.087
0.787
0.986
0.538
1.045
0.928
1.glo
0.420
0.956
1.299
O. 142
0.285
1.515
0.337
0,493
0,284
0.532
0.397
SECTION
DISTANCE
391,[
441.48
468.17
487.58
518.37
589.03
657.94
704.97
756.09
818.97
853.11
899.64
953.20
!014.34
1072.58
1124.4~
1158.{
118?.90
!222.51
1261.01
1373.08
1440.15
1487.21
1513,46
1558.74
1583.69
1600.8!
RECORD OF SURVEY
ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER
vEAS. DRIFT
DE° ~H ANGLE
5800 !7 15
59! 2 16 45
5979 !7 30
6137 !P. 15
62?0 lq 0
6449 !7 45
6600
&~45 16 0
700~+ 15
72~ 15 0
737~ la 30
7680 la 15
77P0 13 0
785~ 13 1.5
9097 15 15
~207 16 0
8469 17
77~0 17
TRUE
VERTICAL SUB DRIFT TOTAL COORDINATES C L 0
DEPTH SEA DIREC DISTANCE
DEG,
5489,81 5410,41 N24,00E 1195,44 N 1126,03 E
5596,91 5517,51 N33.00E 1224,19 N 1141.64 E
5660.94 5581.54 N34.00E 1240.64 N 1152.53 E
5811,32 5731,92 N35,00E !280,61 N 1179,99 E
5946,27 5866.87 N30.OOE !3!7,85 N !203.72 E
6108.06 6028,66 N30.OOE 1363,04 N 1229,81E
6252,37 6172,97 N27,OOE 1402,11 N 1251,03 E
6402,80 6323,40 N25.00E 1442,48 N 1270,72 E
6583,18 6503,78 N23.00E 1490,90 N 1292,27 E
6726.49 6647,09 N19.00E 1528,94 N 1306.87 E
6861.48 6782,08 N25.00E 1563,34 N 1320,77 E
6995.90 6916,50 N21.00E 1595,91 N 1334.60 E
7148,07 7'068,67 N21,OOE 163.1,99 N 1348.45 E
7293,53 7214,13 N1B,OOE 166'6,49 N 1360,67 E
7390,72 7311,32 N27,00E 1688,23 N 1369,67 E
7464,73 7385.33 N32,00E 1703,25. N 1378.!7 E
7640,15 7560.75 N31.OOE 1741.24 N !401,44 E
78g0.54 7811,14 N30,OOE 1801,57 N 1436.99 E
8055,35 7975,95 N28.00E 1844,61 N 1460.84 E
8314.16 8234.76 N26.00E 1916,21 N 1497.32 E
8480.56 8401,16 N24,00E !962,31 N 1518.82 E
9003,47 8924,07 N22.00E 2100,33 N 1577.41 E
9473,98 9394,58 N20.OOE 2213,92 N !621.01E
5 U R E S
ANGLE
D M
1642.26 N 43
1673.91 N 43
1693.37 N 42
1741.37 N 42
1784.85 N 42
!835.85 N 42
1879,09 N 41
1922,36 N 41
1973,01 N 40
2011,37 N 40
2046,58 N 40
2080.41 N 39
2117,01 N 39
2151,42 N 39
2173,97 N 39
2190,98 N 38
17 14 E
0 5 E
53 28 E
39 30 E
2/+ 30 E
3 30 E
44 26 E
22 39 E
55 4 E'
31 20 E
11 32 E
54 15 E
33 55 E
13 52 E
3 9 E
58 39 E
2235,16 N 38 49 44 E
2304,47 N 38 34 36 E
2353,01 N 38 22 39 E
2431,84 N 38 0 14 E
2481,43 N 37 44 23'E
2626.71N 36 54 27 E
2743.93 N 36 12 40 E
DOG LEG
SEVERITY
DEG/IOOFT
1,000
0.803
1,128
0,479
0,380
0,147
0,843
0,191
0.407
0.259
0.608
0,402
0.318
0,206
1,330
0.477
1.106
0,290
0.734
0,219
0.303
0.277
0.310
SECTION
DISTANCE
1661,.J
1681.14
1729.62
!773,70
1825.59
1869.67
1913.90
1965.74
2005.10
2041.10
2075.58
2112.91
2148.00
2170.88
2188.03
2232["4
2302 ,
2350.98
2430,35
2480,29
2626.~8
2743.91
,CO,TO HOLI~ CLOSURE 27z,,.3.c~3 FEET AT N 36 12 40 E
G. J. Ross
Area Superintendent
Amoco Production Company
P.O. Box 779
Anchorage, Alaska 99510
November 10, 1976
File: GJR-841-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
MGS 17595 Well No. 9 Redrill
Please find attached State of Alaska Form P-4 summarizing drilling
operations on MGS 17595 Well No. 9 Redrill for the month of October
1976.
Your~ very truly,
george J, Ross
Area Superintendent
Attachment
Form No. P-4
REV. 3- 1-70 .... '~'~'~"
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. API NUMERICAL CODE
50-133-10076-01
6. LEASE DESIGNATION AND SERIAL NO.
ADL-17595
WELL WELL OTHER
2.NAME OF OPERATOR
Amoco Production Company
3. ADDRESSOFOPERATOR
P. O. Box 779, Anchorage, AK 99510
4. LOCATIONOFWELL
Leg 1, Slot 5, MGS Platform Baker, 1934' FNL,
544' FWL, Sec. 31, T9N, R12W, S.M.
8. UNIT FARM OR LEASE NAME
MGS 17595
9. WELL NO.
9 Redrill
10. FIELD AND POOL, OR WIL~AT
Middle Ground Shoal
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 30, T9N, R12W, S.M.
127~;..RgV NO'
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Status as of October 31, 1976: P.B.D. 6750' Rig released
October 1-19 T.D. 9944' Mud 10.4 drilling
October 20 T.D. 9944' fishing, recovered 243 its (7574')
4-1/2" D.P. and 8 its (243') H.W.D.P. Lower fish 10 its.
5" HWDP (306.91'), Dailey jars 32.8', 2 its. 5" HWDP,
KSW 4.61', 3 Spiral D.C. 93.61', bit sub 2.95'
and bit. Upper fish 16 its. 4-1/2" D.P. (497.6')
October 21-22 T.D. 9944', fishing.
October 23-25 P.B.D. 6750'. Spot 100 sx cmt plug x 9081-8950'
100 sx 7392-7250'. 200 sx Class G with 10% sand
and .6% D-31, 7113-6850'. Run 40# and 43.5# N-80
and S-95 9-5/8" csg to 6844'. Cement with 750 sx
Class G cmt + .75% D-31 + .2% D-19. Run
G.O.I. temp. survey.
October 26 Rig released 0600 hrs. P.B.D. 6750'.
October 28-31 No report.
14. I he,eby ce~ti[y that the foregoing is t~r~'~. )orrect
SIGNED_.z/d'"'24~-dL/~'t'-ig_,~,~- \, ~~ TITLE Area Superintendent DATE 11-10-76
NOTE-Report on th~ form ~s required for each calendar month, regardle~ of the ~atus of operations, and mu~ be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
G. J. Ross
Area Superintendent
November 5, 1976
File: GJR-826-WF
Mr. Hoyle Hamilton, Director
Division of Oil and Gas Conservation
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Amoco Production ~ompany
P.O. Bo× 779 f
Anchorage, Alaska 99517 ? ....
/
I
co~Z ~-~
Dear Sir:
Re: Abandonment of 17595 Well No. 9 Redrill
Permit No. 76-67
Please refer to our letter of October 22, 1976, File: GJR-786-WF,
submitting Form 10-403, Notice of Intent to Abandon MGS 17595 Well
No. 9 Redrill. Attached is the State Form 10-403, Report of Subse-
quen~ Abandonment of the subject well.
A copy of the logs and a directional report will be included with
the completion report to be filed at a later date.
Yours very truly,
Attachment
"Form ~0 - 403
REV. I - ;0-7~
I~brnit "Intentions" in Triplicate
& "Sub.sequent Reports" in Duplicate
STATE O,F ALASKA
OIL AND GAS CONSERVATION COMMITTEE
OIL
WELL
SUNDRY NOTIC:'ES AND REPORTS
Use "APPLICATION 'FOR PERAirl'--" 'for ~ueh
2. NA~ME OF OPERATOR
/~anoco Production Company
3. ADDRESS OF OPERATOR
P. 0. Box 779, Anchorage, Alaska
4.LOCATION OF WELL
At surface
Leg 1, Slot 5, MGS Platform Baker,
1934' FNL, 544' FWL, Section 31,
T9N, R12W, S.M.
99510
13. ELEVATIONS (Show whether DF, RT, GR, etc.
79.4' MSL - KB
Check Appropriate I~ox To Indicate N',ature of NOtice, Re,
5. AP1 NUIVIFF,2C~ CODE
50-133-10076-01
· 6,~.LEASE DEFmlGNATION A/ND SERIAL NO.
'!.J,~ L 17595
· ~L~IF INDIA. N, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
5 MGS 17595
9. WELL NO.
9 Redrill
10. FIFJ~D ~D POOL, OR WII~DCAT
Middle Ground Shoal
11, SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Sec. 30, T9N, R12W, S.M.
12. PERMIT NO.
76-67
)ort, or Other Da~a
NOTICE OF INTENTION TO:
TEST WATER RHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
PULL OR ALTER CASINO
MULTIPLE COMPI,ETE
ABANDONs
CHANOE PLAN~
tother)
BURBEOUENT REPORT OF:
W&TER SltUT-OFF [ I REPAIRING WELL '"'
(NOTE: Report results of multtple completion on Well-
Completion or Recompletion Report and Log form.)
15 DESCRIBE I'nOPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and gtv~ pertinent dates, including estimated date of starting any
proposed work.
Please refer to Form 10-403, NotiCe of Intent to Abandon MGS 17595 Well
No. 9 Redrill, dated October 22, 1976. The following is a detailed
report of the operations described in that previous correspondence.
October 22: Spot 100 sacks of Class G cement + additives at 9081'.
Top estimated to be at 8950'. Pull 18 stands and circu-
late. Spot 100 sacks of Class G + additives at 7392'.
Top estimated to be at 7250'. PUll 5 stands and circu-
late. Spot 200 sacks of Class G cement + 15% sand at
7113'. Top estimated to be at 6850'.
October 23-24: Rig up and run 9-5/8", 43.5# and 40# S-95 and N-80 Buttress
casing as follows:
Size Wt/Ft Grade Interval (KB)
9-5/8"
43.5# S-95 Buttress 0-39.6'
40.0# N-80 Buttress 39.6-938.6'
40.0# S-95 Buttress 938.6-6567'
43.5# S-95 Buttress 6567-6843.7'
The 9-5/8" casing Was landed at 6843.7' and cemented with
750 sacks of Class G cement + additives.
16. I hereby ceAtffy thst the fore~oi~us &n5 correct
SIGNED ./-~ ~/
TITLE
Area Superintendent
DATE November 5, 1976
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
DATE
See Instructions On Reverse Side
Form 10 -403 8~abmtt "In:entions" in Triplicabe
IR.~V. ~ - ~0-T"J & "Sub~quel~t Reports" in Duplicate
STATE O'F ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
/Do not usc this form /or proposals to drill or to decpefl
Use "APP-LICATION FOR PEt~I~IT--" 'for such 'prol~osal$,)
5. APl NUM.F_,t~CAL CODE
50-133-10076-01
$. LEAS~ DESIGNATION A-ND SERIAL NO.
ADL 17595
7. IF INDIA.N, AJ.J~O'l-l'~E OR TRIBE NAJVLE
~,,L ~ G*s C] Multiple zone completion
WELL u__.J WELl, OTHER
NAME OF OPER~,TOFL 8. UNIT, FA1RJV[ OR LEASE NAME
Amoco Production Company MGS 17595
ADDRESS OF C)PERATOtt 9. WELL NO.
P. O. Box 779, Anchorage, Alaska 99510 9 (Redrill)
4.LOCATION OF ~V~L
At~,,'~e Leg 1, Slot 5, -MGS Platform Baker, 1934' FNL,
544' FWL, Section 31, T9N, R12W, S.M.
10. F~LD AND POOL, OR WI~CAT
~iddle Ground Shoal
11. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
13. ELEVATIONS (Show whether DF, RT, Gl:{, etc.
79.4 KB-MSL , 76-67
Check Appropriate Box To Incii'cate Nature of NOtice, Re ~ort, or Other Date
NOTICI~ OF INTI~NTION TO:
PULL OR ALTE~ CASINO
M ULTIPL~ COM PI,ET~
ABANDONe
CHANO~ PLAN~
TEST WATER 8HUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
I1EP^ IB WELL
Other)
Sec. 30, T9N, R12W, S.M.
12. PEP, JVLIT NO.
WATI~R .Ii UT-0FF [ I ___!
REPAIRINO WI~LL
{Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15 DESf'RII~E I'nOPOSED OR CO.MPLETED OPERATIONS (Clearly state all pertinent details, and glvv pertinent dates. Including estimated date of starting any
proposed work.
Operator drilled 12-1/4" hole to TMD 9944'-and logged. Logs indicate
producing zones are much deeper than previous geologic interpretation,
with the G-1 conglomerate top at 9562, TMD (-9025' MSL) and lower (G-3,
G-4 and G-5) zones below the established oil-water contact of '-9350' MSL.
Operator proposes to plug back existing wellbore to approximately 7000'
and set 9-5/8" intermediate casing. An 8-1/2" hole will then be direc-
tionally drilled by sidetracking to a more favorable producing location
upstructure from existing wellbore. Abandonment plugs will be spotted
at 9120-8950' (100 sacks) and 7380-7160' (100 sacks) in the existing
12-1/4" hole. Casing will be set at approximately c~_m~nted
with 750 sacks Class G cement with additives. ~ ~ =~
·
SIGNED '/"~-C/~:'~"~,~K'''N'~' ~'"V':-~''<~'<~'''~'~ TITLE
(Thl~ ~pace for State office use)
CONDITION8 OF ,~'~ROYAL, IF Al,fY:
(J
Area Superintendent
See Instructions On Reverse Side
DATE
October 22, 1976
G. J. Ross
Area Superintendent
October 15, 1976
File: GJR-770-WF
Mr. Hoyle Hamilton
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Anchorage, Alaska 99510
2 ENG
,
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
MGS 17595 Well No. 9 RD
Attached herewith is the State of Alaska Form P-4 summarizing the
drilling operations for MGS 17595 Well No. 9 RD for the month of
September.
Your~ very truly,
George J. Ross
Area Superintendent
Attachment
No~ P-~ STATE OF ALASKA
i-l-70
SUBMIT IN DIJP. LICATE
OIL AND GAS CONSERVATION CO/~AITTEE
MONTHLY REPORT O'F DRILLING
AND WORKOVER OPERATIONS
APl NL~.~ERICA]L CODE
50-133-10076-01
6 LE~kSE DESiGNA.WlON AN'D SEtRIAL NO.
ADL 17595
7 IFTNDIA~ AiXDTT~%E OR TRIBE NAME
1.
W~LL ~VZLL OT~ER
2. N~dVlE OF OPt~ATOR 8. %~IT FA~I OR LEASE
~oco Production Company MGS 17595
3. AD~'REss OF OPhiR g WE~ NO
P. 0. Box 779, ~chorage, Alaska 99510 9 Redrill
I0 F~D F~ND P~L, OR %VILDCAT
Middle Ground Shoal
4 LOCATION OF WELL
Leg 1, Slot 5, MGS Platform Baker, 1934' FNL,
544' FWL, Section 31, T9N, R12W, S.M.
11 SEC, T,, R. M (BOTTOM HOLE
Sec. 30, T9N, Ri2W, S.M.
1:~. PEI:i,MIT NO
76-67
13.REPORT TOTAL DEPT~q AT EI~D OF MON~. CHANGES IN HOLESIZE, CASING A~ C~N'flNG JOBS INCLUDING DEPTH
SET A~ VOL/~ES USED, PF~O~TIONS, ~.~TS .~ ~SULTS FISHIk¢G JO~ JUnK ~ HOLE AND SIDE-~.ACKED HOLE
AND ~Y O~t1 SIGNIFIC~T ~NG~ IN HO~ C~ITIONS
Status as of September 30, 1976: TD 7788', drilling with dynadrill.
September 1-2:
Cut existing 9-5/8" casing at 2175' with jet cutter
and circulate with filtered Inlet water. Increase
weight to 9.0 ppg.
September 3:
Pull 2175' of 9-5/8" casing.
September 4:
Trip in with open end drillpipe to 2175' and spot
hard plug. Tag hard cement at 1838'. Run 13-3/8"
casing inspection log.
September 5:
TD 2069'. Drill hard cement to 1896'. Circulate,
test 13-3/8" casing to 1000 psi for 30 minutes,
okay. Test Hydril, manifold, kill line and choke
line to 3000 psi, okay. Drill 12-1/4" hole.
September 6:
TD 2205'. Drill 12-1/4" hole to 2205'. Fill pits,
mix mud and displace hole with LSND mud system.
September 7-13:
September 14-15:
September 16:
(continued)
TD 5200'. Directionally drill 12-1/4" hole to
5200'. Test rams and manifold to 3000 psi, test
Hydril to 1500 psi, all okay.
TD 5727'.
TD 5948'.
Directionally drill 12-1/4" h°le·
Dynadrill 5825' through 59!48'.
--14. I hereby ce~iiy that the foregst~{~ true and correct
Y~.,-. ~ ( ' ~' Area Superintendent ~ October 15~ 1976
NOTE--Repor~on this form is required for each calendar month~ regardl, ss of the eto~us ~f o~eratio.~, and mu.~t L~ fil,d in duplicate ~ith the
oil and gat conlervation commiffee by the 15~ of the tune.ding mont~, u~l~ ~t~erwi.a ~r~cted.
Amoco Production Company
MGS 17595 Well No. 9 Redrill
State of Alaska Form P-4
October 15, 1976
Page 2
September 17-19:
September 20-23:
September 24:
September 25-27:
September 28-30:
TD 6625'. Directionally drill 12-1/4" hole to
6625'. Begin to trip out, experienced salt water
flow. Trip in to bottom and increase mud weight to
9.7 ppg.
TD 7119'. Drilling 12-1/4" hole. Mud weight 10.3.
Test BOP's, manifold and rams to 3000 psi, Hydril to
1500 psi, all okay. Trip in with dynadrill.
TD 7220'. Dynadrill to 7162', trip in with bottom
hole assembly and directionally drill 12-1/4" hole.
TD 7618'. Drill 12-1/4" hole.
TD 7752'. Drilling with dynadrill.
Amoco Production Company
P.O. Box 779
Anchorage, Alaska 99510
G. J. Ross
Area Superintendent
September 15, 1976
File: GJR-693-WF
Mr. Hoyle Hamilton, Acting Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
CONFER~
FILE:
Dear Sir:
Re: Monthly Report of Drilling and Workover Operations
MGS 17595 Well No. 9 Redrill
Attached herewith is theState of Alaska Form P-4 summarizing the
drilling operations for MGS 17595Well No. 9 Redrill for the month
of August.
Yours' very truly,
George J. Ross
Area Superintendent
Attachment
Form No, P--4
l~gl/. 3- 1-70
STATE OF AI.A~KA
OIL AND GAS CONSERVATION COMMITTEE
SUBMI~f I~ DL?LICAT~
MONTHLY REPORT O'F DRILLING
AND WORKOVER OPERATIONS
NAME OF OPERATOR
Amoco Production Company
ADDRESS OF'OPERATOR
P. 0. Box 779~ Anchora~e~ Alaska
LOCATION OF WELL
~API Nb~EmCAL CODE
50-133-10076-01
~ LE.~SE DESiGNA/qON AN'D SE/RIAL NO.
ADL-17595
7 IF INDiA~ ALP/TEE Ol~ TRIBE NAME
8. L~,'IT FARA{ OR LEASE NAME
MGS 17595
g W~LL NO
99510 9 Redrill
I0 FLFJ~D A_ND POOL. OR WILDCAT
Leg 1, Slot 5, MGS Platform Baker, 1934' FNL,
544' FWL, Section 31, T9N, R12W, S.M.
Middle Ground Shoal
11 SEC. T.. R. 1%i (BO'I'TOB,.~ HOL~
Sec. 30, T9N, R12W, S.M.
1~ P]~RMIT NO
76-67
13.REPORT TOTAL DEP~I-I AT END OF MONTH. CHANGES IN HOLESIZE, CASING AN/) CF2~IF_~N,TING JOBS INCLUDING DEPT/-I
SET ANqZ) VOLUMES USED PERFORATIONS, T'F-STS A/N-D RESULTS FISHING JOBS JL~K LN HOLE AND SIDE-~'IAR, ACKED HOLE
AND A3qY OTi~J~R SlGNIFICA2qT ~GK.S FN HOL2~ CO~ITIONS
Status as of August 31, 1976: PBD 2620', circulating mud from 9-5/8" x
13-3/8" annulus.
August 29:
August 30:
August 31:
PBD 6405'. WOC. Rig up and kill well. Unsting tubing,
circulate and spot 200 sacks of neat G with additives.
W0C and run in and tag cement plug at 6405'.
PBD 5900'. WOC. Spot 200 sacks of neat G + additives.
Top of plug at 5900'. Pull and lay down tubing.
PBD 2620'. Set bridge plug at 2620'. Trip in and latch
on to 9-5/8" casing with casing spear. Pull 350,000#
with no movement. Cut casing at 20', pull 100,000# with
no movement. Displace mud from 9-5/8" x 13-3/8" annulus.
14. 1 hereby c~r~ify that the .foregoing is true ~ correct
Area
Superintendent
September
15,
1976
' ' - ,4'~,i ' (,'i,''~
NOTE --Report on this form is required for each calendar month~ regardless of tho sea?us af o~erati~ns, a~d ~ust I~ filed in duplicate with the
otl and gas conservation committee by tho I~th of the succeeding mont~, u~lss~ otherwise directed.
~IB
STATE
ef ALASKA
DEPARTF~dENT OF ~ATURAL RESOURCES
Division of Oil and Gas
Hoyle H. Hamilton~~
Acting Director
September 8, 1976
FROM:
Harold Hawkins
Petroleum Inspector
SUBJECT: BOP Test for Aha)CO MGS No~ g,
Sec. 30, T9N, R12W, S.M.
.Permi t No. 76-67
September 4~ 1976 - I went to Kenai and then by chopper to platform
'Baker fo~ ~A~oco tO witness BOP testing. Harrell McRaney, operator for
Amoco, and I started the BOP test at 4:00 PM. The test plug was of the
wellhead type. There are two valves on the choke side of the spool and
one valve on the kill side of the spool and a 1o~ ~torque check valve which
was tested to 3000 psi. The .check valve did not hold the test. The
upper pipe rams and lower pipe rams tested to 3000. psi. The blind rams
or CSO's tested to 3000 psi. The hydril or annular preventer tested to
1500 psi. There were 3" outlets on the spool.. There were 12 single flanges
on the manifold connected to crosses and 12 double flanges. Eleven lovl
torque wing valves, two positive chokes and one superchoke were tested to
3000 psi and held. The upper and lower kelly .were .tested last and held
3000 psi.
The accumulator master gauge ~was 2700 psi.. The controls on the accumulator
were actuated plus master controls on the floor which were OK. They had
four N2 backup bottles in the cellar with the accumulator, but were not
hooked up to the accumulator. There was no way at. the time to check them.
The operator for Amoco, Harrel McRaney, told me. he would see that this
was taken care of and manifolded up and also repair or replace the check
valve within 5 days and give us a call as well as the psi on each backup
N2 bottle. There was a dart valve on the floor which was OK.
In summary: I went to platform Baker for a BOP ~test. The rig was in
good shape and all tests were OK except for a check valve which they are
to repair and N2 backup bottles that are: not hooked up. Both Harrel
McRaney, operator for Amoco, and Bill Halverson, superintendent for Amoco,
said this would be taken care of and give us a call within five days.
Sep.%ember 9, 1976 - Bill Halverson called. The check valve has been
r~iaced and N2 backup bottles manifolded up to accumulator and four bottles
have 1600 psi each.
DL~ :bjm
~,,~.. .... , ....... ~ .¥ . Field Inspection ,Beport
~.~ /~ ~ ~/)~_-p ~...'... Represented 'by~ ~'~-~
'. ~ '::' · . ~ , ~ ~ .-,,
;'.Satis~actoc~ ~y e ~nspection. · Satisfacto~ T~pe ~nspect~on
"'(';' ~e~t"~"'No ~tem (~ Location,General ~ Yes'-¥~No Item ~)',BoPE Tests
"'. '( )' "(~) ~] Well Sign ' (~) ( )
. (kz~) ~ 2. General Housekeeping . (~) ( ) 16. ~ fluid-~)wt~{')mud
' ( y
~) ()
()
() ()
() ()
() ()
() ()
() ()
3. Reserve Pit-( ~)open( )filled
4. Rig
( ) Safety Val.ve Tests
5. ~urface-No. Wel. ls
6. SubsUrface-No. Wells
( ) Well Test~Data
7. Well Nos. , , ,
8. Hrs. obser , , ,
9. BS&W , , ,
10. Gr. Bbls.
( ) Final Abandonment
(~) ()
() C~)
(×) ()
() ()
(x) ()
(~) ()
(x) ()
(~) ()
17. Master Hyd. Control Sys.-~Td~ps~i]g:.-.~
18. N2 -btl s. , ,__,__psig
19. Remote Controls
20. Drilling Spool- '~//"outlets
21. Kill Li.ne-(A~) Ch6ck valve
22. Choke Flowline ( ) HCR valve
23. Choke Manifold No. valvs// flas/&-
2~\ Chokes-(X~)Remote(~Pos. (~dj ]
25. TeSt Ptua~(~)Wellhd( )cs.~( )~fone
26. Annular Preventer
(×z) ( ) 27. Blind Rams,~s.ia
() ( ) 11. P&A Marker (X) ( )..:-~-'28 Pipe Rams jmym..psiq
( ) ( ) 12. Water well-( )capped( )plugged (~) ( ) 29. Kelly & Kelly-cock,.~,m~..,m psig
( ) ( ) 13. Clean-up (~) ( ) 30. Lower Kelly valve ~.~sio
( ) ( ) 14. Pad leveled ~) ( ) 31 Safety Floor valves-(~;--)BV (~)Dart
Total inspection observation time hrs/days Total number leaks and/or equip, failures
Remarks l- M /:z-,~ ~ z~/~ T(~ /~ z~ ..,'~z~SA~.~¢~i) ~ .~ & ~., ~ .~A/:t¢ ~', ~'~ ~z~_~
.P _¢ /
cc:~z_z A/.4X..~i~,_~m~/Notify in ~ .da_~ys or when ready
Inspected by H~4w/!,..~/.:~.'S Date
Division of 0tl and Gas
3001 Porcupine Drive, Anchorage, Alaska 99501
August 3, 1976
Re: MGS 17595 No. g (Redrill)
Amoco Production Company
State Permit No. 76-67
George J. Ross
Area Superintendent
Amoco Production Company
P. O. Box 779
Anchorage, Alaska 99510
Dear Sir:
Enclosed is the approved application for .permit to drill the above referenced
well at a location in Section 30, Township 9N, Range 12W, S.M.
Well samples, core chips and a mud log are not required, A directional
survey is required.
Many rivers in Alaska and their drainage systems have been classified as
important for the spawning or migration of anad~omous fish. Operations in
these areas are subject to AS 16.50.870 and the regulations promulgated
thereunder {Title 5, Alaska Administrative Code). Prior to commencing
operations you may be contacted by the Habitat Coordinator's office, Depart-
ment of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46, Chapter 03,
Article 7 and the regulations prolmulgated thereunder {Title 18, Alaska
Administrative Code, Chapter 70) and by the Federal l~ater Pollution Control
Act, as amended. Prior to commencing operations you may be contacted by
a representative of the Department of Environmental Conservation.
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department
of Labor is being notified of the issuance of this permit to drill.
To aid us in scheduling 'field work, we would appreciate your notifying this
office within 48 hours after the well is spudded. We would also like to be
notified so that a representative of the Division may be present to witness
testing of blowout preventer equipment before surface casing shoe is drilled.
George J. Ross -2-
August 3, 1976
In the event of suspension or abandonment please give this office adequate
advance notification so that we may have a witness present.
Very truly yours,
Thos. R. Marshall, Jr.
Executive Secretary
Alaska Oil and Gas Conservation Committee
Enclosure
CC:
Department of Fish and Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Department of Labor, Supervisor, Labor Law Compliance
Division w/o encl.
G. J. Ross
Area Superintendent
July 26, 1976
Amoco Production Company
P.O. Box 779
Anchorage, Alaska 99510
__] SEC
CONFER:
EILE:
File: GJR-581-WF
Mr. Hoyle Hamilton, Acting Director
Division of Oil and Gas
Department of Natural Resources
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Sir:
Re: Application for Permit to Drill
MGS 17595 Well No. 9 Redrill
Attached is a Form 10-401, Application for Permit to Drill MGS .17595
Well No. 9. This well, which was originally a producer, was converted
to water injection in 1971 and has been shut-in since April 1974. We
propose to sidetrack the wellbore by cutting and pulling 2500'.of 9-5/8"
casing and drilling new 12-1/4,' hole to a more favorable upstructure
producing location. There are no affected operators.
Attached also are a draft in the amount of $100 for the'filing fee' a
BOP sketch, and a plat of the MGS Field shoWing the proposed bottom hole
location relative to Platform Baker.
We anticipate starting the~proposed work sometime after August 1, 1976.
Yours very truly,
George'S. Ross
Area Superintendent
Attachments
JUL ? !976
DIVISION OF OIL AND GAS
ANCI..tOCA
Form 10;401
REV. 1-1-71
la. TYPE OF WORK
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT IN TRIPLI
(Other instr uction.,.~_.~.
reverse side)
PERMIT TO DRILL OR DEEPEN
DRILL
b. TYPE OF WELL
WELl. F~
OTItER
DEEPEN E] (recomplete by sidetrack
SINGLE MULTIPLE
ZONE E~ ZONE [~
2. NAME OF OPERATOR
,~noco Product±on Gompany
3. ADDRESS O1: OPERATOR
t'. 0. Box 779, Anchorage, Alaska 99510
4. LOCATION OF WELL
Atsurf .... Leg 1, Slot 5, MGS Platform Baker, 1934' FNL,
544' FWL, Section 31, T9N, R12W, S.M.
At proposed prod. zone
150' FSL, 2150' FWL~ Section 30, T9N, R12W, S.M.
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
20 miles northwest of Kenai, Alaska
API # 50-133-10076-01
6. LF. ASE I)I:;S1GNATION AND SERIAL NO.
ADL 17595
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
MGS 17595
9. WELL NO.
9 (Redrill)
10. FIELD AND POOL, OR WILDCAT
Middle Ground Shoal
11.SEC., T., R., M., (BOTTOM
HOLE OBJECTIVE)
Sec. 30, T9N, R12W, S.M.
12.
14. BOND INFORMATION:
TYPE Surety and/or No.
Blanket bond in force
3100' FEL
Sec. 30
15. DISTANCE FROM PROI'OSI£D *
LOCATION TO NEARES'F
PROPERTY OR LI~ASF, LINE, FT.
(Also to nearest drig. unit, il' any)
18. DISTANCE FROM PROPOSEI) LOCATION
TO NEAREST WELL DRILLING, COMPLF. TEI),
OR APPLII£1) FOR, F'T.
1500' from MOS 17595 Well No.
16. No. OF ACRES IN LEASE
5106
19. PROPOSED DEPTIt
9500
~ount$100,000
17. NO,ACRES ASSIGNED -
TO TillS WELL
8O
20. ROTARY OR CABLE TOOLS
Rotary
21. ELEVATIONS (Shoxv whether i)l:, RT, CR, etc.) 22. APPROX. DATE WORK WILL START
79.4' KB- MSL August 10~ 1976
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF I[OI.E SIZE O1: CASING WE1GIll' I'F,I~, FOOT GRADE SETTING DEPTH Quantity of cement
17-1/2" 13-3/8" 54.5# J-55 1956 To surface (previously set)
12-1/4" 9-5/8" 40 - 47# S-95 9500 As required to cover pay
_
...
Operator plans to plug and abandon existing perforations, cut and pull
2500' of 9-5/8" casing, spot a sand-cement plug to 2200', and drill new
12-1/4" hole directionally to the above target at the top of the Lower
Kenai G-5 zone at TVD 8900. Zones of interest will be perforated, stimu-
lated if necessary, and produced. There are no affe ' s
plat and BOP drawing are attached.
JUL 2 7 t976
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If propo~l is to deepen give data on present productiv~/~r~l~op~
new productive zone. If propo~l is to drill or deepen d~ection~y, ~ve pertinent data on subs~face locations a~ measure~ and~rue , .,
verti~fl depths. Give blowout preventer program,
24. 1 hereby(c~[~tify that the Eoregoing~i.T'msand Correct
(This space for S,,;,e offi3e~se) "~
DATE ....July 26, 1976
CONDITIONS OF APPROVAL, IF ANY:
nTLE Area Superintendent,
I
SAMPLES AND CORE CIIIPS REQUIRED I
I
[] YES E~ NO
DIRECTIONAL SURVEY REQUIRED
E~ yES [] No
MUD LOG
[] YES ~ NO
OTHER REQUIREMENTS:
A.P.I. NUMERICAL CODE
50-133-10076-01
PERMITNO.. 7§-67 APPROVAL DATE Auqust 3, 1976
APPOVED BYi ., "t~~-~--' TITLE Exec. Secretary ...... DATE August 3~ !976
*See Instruction On Beverse Side
Amoco Production Company
ENGINEERING CHART
(TRACING)
SHEET NO.
FILE
APPN .
DATE
BY'
OF
,001 : 'i'9
3~nion~ls 3NOZ ,g-g,
·
,O001=,,I'elD:)S
~NSV"IV '.L3"INI NOO3
0931J ~VOHS ONRO~9 ON3 HIBON
3"10Ql~
£HECr, LIST FOR IiEW ;'!ELL , rRI',ITS
the permit fee attached ................
Company /~--? f~ ~ co
Yes rio P, ema rks
Lease & Well rlo. //~ ...... ..
Is :.:elt to be located in la, defined pool'~
. Is a registered survey plat attached
;-. Is well located eroDo~..~, dis~:nce~ from property, line
'. Is well located proper distance from other wells .
~. Is sufficient undedicated acreage available in this pool
;'_ Is ',.,,ell to be deviated
Is operator the only affected party
Can permit be approved before ten-day wait . .
3. Does operator have a bond in force .... . .....
I. Is a conservation order needed . .
~. Is administrative approval needed
3. Is conductor string provided .................
Is enouah cement used to"circulate on conductor and surface
5. Will cement tie in surface and intermediate or production strings
~_ Witl cement cover all known productive horizons
7. Will surface casing protect fresh water zones
Will all casing give adequate safety in collapse, tension & burst
Does BOPE have sufficient pressure rating
Xdi tional Requirements'
- ' t