Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout176-031DElft. OF ENVIRONMENTAL CONSERVATION / TONY KNOWLES, GOVERNOR DIVISION OF ENVIRONMENTAL HEALTH SOLID WASTE PROGRAM 41'0 WILLOUGHBY AVE JUNEAU, ALASKA 99687 http :llwww.state.ak.usldec/deh Telephone: (907) 465-5162 Fax: (907) 465-5362 Harry A. Eaton October 23, 2001 HES Manager Unocal Alaska 260 Caviar Street ~> ~ lx ~x~ i.x_% ~ '~as/ra O~?~ r~_ t/ ,2170 / . Kenai, Alaska 99611 Reference: ~~~v°efrPerl?;n~y~~l,°;urI~anA~~~a~tt~~~i!Lle°s~ajt~2~e~: Cook Inl~",)- [ Cx%-o'n% ~-~ --- --,-, Dear Mr. Eaton: h~,'~ The Alaska Department of Environmental Conservation (ADEC) has completed review and public notice for penTlanent closure approval for the above reference reserve pits located in the Susitna Flats State Game Refuge. The closure applications provided the required information describing the history of the reserve pit(s), the present condition of the reserve pits(s), results of any required water sampling and an assessment of the potential risks posed by the clril]ing waste to human health and the environment. At these locations, the reserve pits are backfi]]ed and there Js no exposed drilling waste. ADEC coordinated several field inspections of the sites with the Alaska Department of Fish and Game and the Alaska Department of Natural Resources. Public notice requesting comments on the closure requests was published September 20 and 21, 2001 in the Anchorage Daily News and posted on the state web site September 21,2001. No public comments objecting to closure approval were received in response to this public notice. ADEC has determined that the reserve pit at this site meets the closure requirements of 18 AAC 60.440. Closure Approval Under authority of 18 AAC 60.440 (j), ADEC grants permanent closure approval to Unocal Alaska for the inactive reserve pits at the following sites: Unocal Alaska Mr. Harry A. EatOn October 23, 2001 Page 2 of 2 Well Name Lewis River I (A- 1) Lewis .River B-I ~ Lewis River C-1 Lewis River D-1 '~ Pretty Creek #2 ~ API Number 50-283-20047-00 50-283-20052-00 50-283-20061-00 50-283-20068-00 50-283-20022-90 MTRS Sec. 02, T14N, R9W, SM Sec. 10, TI 4N, R9W, SM ' Sec. 35, TI5N, R9W, SM Sec. 35, T 15N, R9W, SM Sec. 33, TI4N, R9W, SM Landowner ADF&G/ADNR ADF&G/ADNR ADF&G/ADNR ADF&G/ADNR ADF&G/ADNR Terms and Conditions~ This permanent closure approval is subject to the following terms and conditions: 1) In accOrdance with 18 AAC 60.440(1), the Department will require additional investigation, assessment, monitoring or remediation, if n6w information regarding conditions at the reserve pit facilities indiCates that"further' hctions .are necessary to protect human health or the environment. ,. · 2) The approval granted by this letter is for the inactive drilling waste reserve pit(s) only. Closure for the pad as a whole (if required) must be coordinated between the owner/operator and the appropriate land owner/manager. ~: .: ..~. Any person who disagrees with any portion of tlais decision may .request an adjUdicatory hearing in accordance with 18 AAC 15.200-'310. The request should'be mailed to.the Commissioner of the Department of Environmental Conservation, 555 Cordova Ave. Anchorage, AK 9950.1. If a hearing is nOt requested within thirty (30) days of the date of this letter, the right of appeal is waived. If an adjudicatory hearing is requested and .~ranted, this decision remains in full effect during the adjudicatory process. Sincerely, Heather Stockard Solid Waste Program Manager Heather S tockard @ envircon.state, ak.us CC' ~:.: Tom. Maunder;~.A OGCC, ':~'be:¢;hh'~hee~n'er, ADNR, Anchorage Wayne Dolezal, ADF&G, Anchorage John Hammelman, Unocal PLUGGING & LOCATION CLEARANCE REPORT State of Alaska .ALASKA OIL & GAS CONSERVATION COMMISSION Lease Memorandum To File': API No. Well Name Operator . Location Completed ?/~ ~/~6 . · Note casing size, wt, depth, cmt vol, & Procedure. Perf intervals - tops Review the well file, and comment on plugging, well head status, and location clearance- provide loc. clear, code. Well head cut off: Marker post or plate: Conclusions ::~g r / y ; code June 4., 1981 Cities Service Company 1016 W. Sixth Avenue, Suite 420 Anchorage, Alaska 99501 Alaska Oil arid Gas Conservation Con]mission Regulations Article 2, ABANDONMENT AND PLUGGING, 20 AAC 25. 120 I~ELL ABANDONMENT MARKER and 20 AAC 25.170 LOCATION CLEAN UP. Gentlemen: In regard to the above referenced regulations, your attention is called to an attached list of wells which, according to our records, have not received a final location ins~x~ction and approval of clean up. In compliance with 20 AAC 25.170 Section (a), "Within one year of suspension or abandonment of an on- shoro well", all clean up work is to ~ finished. Section (b) provides the means for an extension of time if a valid reason exists. Section (c) provides for on site insFection. Consequently, we are presenting the following list of your abandoned and/or suspended wells. Many of these are now more than one year old and. are not in compliance with regulations. Others should have the final inspection completed this summer while weather permits. This list covers the years 1.~75 to date. There may be so,ne earlier %~;ells that also need inspec- tion. If you have any earlier wells to be inspected this summer please inform us. Therefore, we are requesting a schedule from you for this summer when our field inspectors can accompany your representa- tives to these sites for the final clean up inspection. Yours truly~,~ Lonnie C. ~ Smith Commi s si one r LC$/JKT: L~ CITIES SERVICES COMPANY PLUGGED & ABANDONED E. Lewis River #1 Lewis River #~-1 Hoyle H. Hamilton ~ Commissioner Chairman'fi"' . Commissioner Russell A. Douglass ~ Petroleum Eng~n~r Alaska Oil & Gas Conservation Commission February 6, 1979 Final Abandonment Inspection, Cities Service Lewis River B-i Thursday., October 12, 1978 - I traveled to the Beluga River airstrip via Troy Air Service with Reggie Elkins (Cities Service) and Ed Barber (ADL). Purpose of my trip was to witness location cleanup and aban- donment of the Lewis River 5-1. We drove to the location about 11:30AM. Photo #1 looks north across the location. Photo #2 shows the well marker and the western edge of the pad. Photo #3 looks south across the pad, Photo #4 looks west across the pad. Ail photos show the pad to be free of debris and ade- quately graded. The well marker comtained all the required information. I completed a "Field Inspection Report" giving the Lewis River B-1 final abandonment approval. I gave a copy to Mr. Elkins and the original is attached, summary, I witnessed and approved final abandonment of Cities Service,~ ewis River B-1 location. RAD/LCS:emi 'Al~ a Oil and Gas Conservation Commi~ e ' Field Inspection Report Drlg. Permit No.~_ ~Platfm Sec~T Operator___~/~'/E_3' _~<~vg~' Represented by4¢~_~-/~¢' ....~...~ & Number Z~/~ Satisfactory Type Inspection Satisfactory Type Inspection Yes No Item ( ) Location,General Yes No Item ( ) BOPE Tests 1. Well Sign ( ) ( ) 15. "Casing set 2. General Housekeeping ( ) ( ) 16. TesL fluid-( )wtr.-----~ )mud ( ) oil ~. Reserve Pit-( )open( )filled ( ) ( ) 17. Master Hyd. Control Sys.- psig 4. Rig ( ) Safety Valve Tests ( ) ( ) 5. Surface-No. Wells ( ) ( ) 6. Subsurface-No. Wells ( ) Well Test Data ( ) ( ) 7. Well Nos. , , ( ) ( ) 8. Hrs. obser , , ( ) ( ) 9. BS&W ;~ , , , ( ) ( ) 10. Gr. Bbls. , , (,~() Final Abandonment (~/) ( ) l l. P&A Marker ( ) ( ) 18. N2 btls. , ,I,__?sig ( ) ( ) 19. Remote c~-n-trols ( ) ( ) 20. Drilling spool- "outlets ( ) ( ) 21 Kill Line-( )Check valve ( ) () 22 ( ) ( ) 23 () () 24 ( ) () 25 () () 26 () () 27 () () 28 Choke Flowline ( ) HCR valve Choke Manifold No. valvs flus Chokes-( )Remote( )~os.(-~dj]' Test Plue-(!' )Wellhd( )csg( )none Annular Pre~enter, ..... psie B1 ind Rams, psim Pipe Rams ~.psiq (X') ( ) 12. Water well-(/~)capped( )plugged ( ) ( ) 29 Kelly & Kelly-cock ..psig (X) ( ) 13. Clean-up ( ) ( ) 30 Lower Kelly valve psin (~) ( ) 14o Pad leveled ( ) ( ) 31 Safety Floor valves--L-(- --)-BV / )Dart Total inspection observation time~l (~/days Total number leaks and/or equiP, failures Remarks /- ~?~ f'/ ~., .~'L m'_~, ,,~zvO ~)~'/~,e~~'O g?~'~/~ ~ ~ ~oo~ cc' Noti.fy in days or when ready Inspected by~ ~)~ _Date_~ Z,'~!~/~~ CITIES SERVICE COMPANY 900 COLORADO STATE BANK BUILDING 1600 BROADWAY ' DENVER, COLORADO 80202 State of Alaska Department of Natural Resources Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Hayle H. Hamilton Chief Petroleum Engineer Dear Mr. Hamilton: 2-0263 September 23, 19' Re: Lewis River B #1 Sec. 10-T14N-R9W, S.M. Matanuska Susitna Borough, Alaska Enclosed please find the following documents required for the completion report for the subject well: Completion report (Form P-7) in duplicate, two copies of the Sidewall Core Analysis, two copies of Halliburton's Formation Testing report for five different tests, and one sepia and one copy of the mud log. Also enclosed are one sepia and one copy each of the following electric logs: Cement Bond Log Dual Induction Laterolog Formation Density CompenSated Borehole Compensated Sonic If there are any questions concerning the enclosed, please contact some- one at this office. R~M:jah Enclosures Sincerely, Eng±neer ~'orm P--7 ~'STATE 'OF ALASKA ~ (Seeother In- structions on reverse side OILAND GAS CONSERVATION COMMITTEE WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: OII: [--] I;AS {--] DRY [] Other WELL WELL b. TYPE OF COMPLETION': WELL OVER EN BACK nESVR. Other '~. NAME OF OPERATOR Cities Service Company '" 3. A~)DRESS OF 6PERATOR ................. ' ....... 1600 Broadway, Suite 900~ Denver~ Colorado 80202 4, LOCATION OF WELL (Report location c%early and in accordance with any State requirements)* At surface 300 FNL, 1500 FEL At top prod. interval reported below same as above At total depth same as above 13, DAT~ SPUDDF_,~.' il4. DA-~t'~T.D..R:EA~C..I':]~IJD-[1§. D'AT~ CO~IVIP SUSP OrR ~ ]1~.' I~I'-EVA~'IOIN'S 5/18/76 ] 7/4/76 ~''' 7/22/76 [ 64' GR 18. TOTAL DEPTH, 1VLD & TVD ~19. PLUG, BJ~CK MD & TVD~0. IF 1V~JLTI~LE CO~PL.. 21. I-IOW 1VLA.NY* ROTARY TOOLS 10,319 TVD NA NA 22.' PRODUCING INTEHVAL(S), OF THIS COMPLETIO/NI--ZlY)~, BOTTOM. i~A1V/E (MD AND 'CVD)* 5, AP1 N:C~kL CODE 50-283-20052 Plugged and abandoned:. 6. LEASE DESIGNATION AND SERIAL NO. ADL 58802 .. ?. IF INDIA_~, ALLOTTEE OR TRIBE NAll&E i None i8. UNIT,FA.HNi OR LEASE NAME Lewis River B 9. WELL NO. 10. FIEI.2D AND POOL, OR WII-~DCAT Lewis River 11. SEC., T., R., M., (BOTTOM OBJECTIVE) Sec. 10-T14N-R9W S.M. 12. PEP,2/IIT NO. 76-31 1 (D.F, RKB, RT, GR, E'I~C)*{17. ~. CASINGHEAD KB 79' INTERVALS DRILLED BY CABLE TOOLS 0-10,319 None 23. WAS DIRECTIONA~L !SURVEY 1VfADE No 24.TYPE ELECTRIC A4N. D OTHER LOGS'RUN DIL, Formation De,nsit~,' Compensated, Compensated Borehole Sonic~ Cement B, ond Log 25. CASING RECORD (Report all strings set in well) 30" / 104#'- [ L? ! 60' IDriven' INo cement used None 20- I :s~# · / ~.r i 3n" [ 26- /soo sx Class G -- · 13-3/8" [61 & 5:4,5#']K-55 [ 2399'I i 17~.." ~400 sx Class G -- ~-~/~;' ~7 ~ ~'3~# [s~ ~ ! s~7', [ i21~,, ,~7~ ~ c~ o -- 2~. LIN~a ~co~ ~ N80 [ ~. ~USmG ~cO~ .S:~B '~[ ~ TOP (MD).'[ I :~O~O=.,., [ [ {1SACKS C~T, J~',~D) I m: t' ~ =~ '=D? ,!{ --m<=__~::~:~ <~, 28. PERORATIONS OP~ TO PRODU~ON (In~N~ size ~d n~mb r~ ~ -~- -'ACID si:roT F2~:'U~ C~:'NT SQU~Z~ ~C DATE FIRST P~ODUC~ON ~O.DUCTION ME'I:HO~~ [~z~.t. pump~[~size and t~pe oi pump) [WELL STATUS (~oduc~ or ! shut-in) ~ o~ rzS~, I~O~S TES~ ~I~OXE SIZE [~OD'~ FO~ O~BEL. G~CF. WA~B~. ! GAS-OIL K~IO I . ! t~'~~ ~ .... - , ., I. i i i F OW, ~BING ICAS~G P~S~ [CAL~~ OI~BBL. GA~. 'I" ,. 'F ~l. ms~6~i~o~ o~ ~ (~ol~, ~ lot ]~el, ~t~l, etc.) 'LIST 0~' ATT-ACHMENTS WATEI~--BBL. ! OIL GRAVITY-API (COLOR.) I ] I TEST WITNESSED BY ' See Revere m z? ~ 33. I hereb~ certjf, Y7. t¥'at/the ~6~e$6rJ~ and .attacheq/~nfl/¥n, glion is complete and correct as determined from alUavallable records *(See Instructions and S~ces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for sut:)mitting a complete ~,nd correc! well completion repor~ end log on all types of lands and leases in Alaska. Item: 16: Indicate_.. which elevation is used as reference (where not otherwise shown) for depth measure- ments given in cther spaces on this form and in any atl,~chmer~ts. Items 20, and 22:: If this well is completed for separate, prcduction from, more than one interval zone (multiple completion), so state ,n item 20, and in item 22 show the prc. Jucia9 interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the intervol reported in item 30. Submit a separate report (paoe) on this form, adequately identified, for each additional inte, val to be seperately produced, show- ing the acktitional data pertinent to such interval. It.m]6: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMM"AItY ¢)~' I~();~IVI'ATiON TF,.S'I:S 'IN('LuI)IN(; IN'I'EI'{VAI- TE,$TED."I'HEZ~'kSUIIE DATA. AND ~,COYERIF,,S OF O1~'/. GAS. .. 35 (;I~)L,OGIC MARKE~L~ WAT~C,H. AND MUD NA. ME Dr±l~ S~em Tes~ D~a EnClosed Sterling Surface Same Beluga 2805 ' Same Tyonek 6550 ' Same Middle Ground , Shoals 8312 ' Same i S2dewa1Z Core DaCe Enclosed . . , . r i ' ~ L U ~1 D S A M P L E D A T A Date - 7-11 - 76 Number 817578 , ~, ,., Ticket Sampler Pressure .P.S.I.G. at Surface Kind Halliburton Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE cc. Oil cc. Water T~ster MR. BOWEN Witness cc. Mud Drilling Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY DR S Gravity oAPi @ °F. EQU I PMENT & HOLE DATA Gas/Oil Ratio cu. ft./bbl. Formation Tested - RESISTIVITY CHLORIDE Elevation 64 ' CONTENT Ft. Net Productive Interval 4392-4418" Ft. Recovery Water ~ @~ °F. ppm All Depths Measured From Kelly Bushing 85' Recovery Mud ~ @ ~ °F. ------ppm Total Depth 4480' PBD Ft. Recovery Mud Filtrate ~ @ ~°F. ppm Main Hole/Casing Size 9 5/8n Csg. Mud Pit Sample @ °F. ppm Drill Collar Length 1 80' I.D. Mud Pit Sample Filtrate @ °F. ppm Drill Pipe Length 4l 34' I.D. 2.441" Packer Depth(s) 4343 ' .Ft. Mud Weight 9 2 Salt H20vis cp Depth Teste,r,,Valve 4318' · TYPE AMOUNT Depth Back Surface Bottom Cushion Ft. Pres. Valve Choke 1 / 4-1 / 2" Choke· 87 Recovered 273 Feetof hole fluid Recovered Feet of Recovered Feet of . Recovered Feet of Recovered Feet of · Remarks SEE PRODUCTION TEST DATA SHEET *-Closed in pressure readings at the end of segmented readings, not at the end of time allotted for closed in pressure periods. , Gauge No. 489 Gauge No. ' Gauge No. TEMPERATURE Depth: 4331' TIME F,t. Depth: Ft. Depth: Ft. 1 O0 48 HourClock Hour Clock HourCIock Tool A.M. Est. °F. Blanked off No Blanked Off Blanked Off Opened P.M. Opened A.M. Actual *F. Pressures Pressures Pressures Bypass P.M. Field Office Field Office Field Office Reported Computed Initial Hydrostatic 1 983 2004 Minutes · Minutes ~.~o Initial 24 53 ~.c Flow ;r~. Final 74 76 120 98 _ Closed in 1958 2006' 240 193 ~ Initial 74 96 c o Flow ~of, ~ino, 86 97 ~,, 60 64 _ C~osed in ] 934 ] 920* ] 20 ] 25 3'~ Flow Initial 86 117 ~.~ .., Final 103 117 60 62 Closed in 1092' 40 85 _Final Hydrostatic 1983 UTR UTR-UNAJ~LE TO READ __ i'ri r'rl O O FORM igI-RI--PRINTED IN U.S.A. FORMATION 'TEST DATA L. ITTI. IE'8 96671 IOM e/74 Casing perfs. Bottom choke . Surf. temp °F Ticket No, 81 7578 Gas grovity Oil gravity_ ..... GOR Spec. gravity ,. Chloride~ ppm Res. @ ,'F INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED Date Choke Surface Gas Liquid Time a.m. Size Pressure Rate Rate Remarks ~).m. psi MCF BPD Set packer @ 4343' 7' 30 AM Opened tool wi th a li§ht blow. .9- 30 Closed tool 1'30 Reopened tool with a light blow. 2-30 Closed tool 4-30 Reopened tool with a weak blow to dead. 5:30 Closed tool ,, 6:10 Pul led loose I Pulled and recovered 273' hole fluid , , .o..,.,..,-..,...o,....,A. PRODUCTION TEST DATA _Cauge. No' ,,, 489 Depth 4331 ' Clock No. 10054 ~8 hour No. 817578 First First Second Second Third Third Flow Period Closed In Pressure Flow Period Closed In Pressure Flow Period Closed In Pressure Time Deft. Temp.PSlG Time Deft. Log t .~L ~ Temp.PSlG Time Deft. Temp.PSiG Time Oefl. Log t -f- 8 Temp.PSlG Time Deft. Temp.PSi~ Time Deft. Log t .000" Corr. .000" ~) Corr. .000" Corr. .000" ~ Corr. .000" Corr. .000" ~ Corr. o ."000 ..... 53 .000 76 ,, .000 96 .000 97 .000 l 17 .000 l 1 7 1 .0301 59* =0217 278 .106 97 .020 688 ..104 ll7 .0093 222 2 .0569 64 .0434 644 .040 944 .0186 313 3 .0837 73 .0651 980 .060 1163 .0279 421 .... 4 .1105 ..... 73 J. 0868 1253 .080 1345 .0372 538 s .1372 74 '.1085 1489 .100 1501 . .0465 650 6 .,1640 761302 1670 .120 1627 .0558 743 7 t1519 1795 , ,1.Z~O 1739 .0651 844 8 736 1889 ,160 1832 .0744 929 9 I, 1953 1963 ,185 . 1920'*' ~ .0836 1006 lo .2120 12006** / .0060 1092'* !1 / 12 . 13 14 Gouge No. Depth Clock No. hour o I 1 2 3 5 6 ,, ? 8 10 11 12 13 .,, 14 Reodin~l In,tervol l 6 13 12 6 Minutes REMARKS: *-18 minutes **-10 minutes · 0nly 127 minute se¢m. jhted' prior 't0-'hydr°~_~atic ipre.ssur_e bypassi_ng. · **_i5 minutes .... Only lll minute segmented prior to hydrostatic pressure.bypassing, ****-8 minutes ..... Only 62 minutes segmented prior to apparent leakage FORM 18~-RI--Pi~INTED IN SPECIAL PRESSURE DATA LITTI,,,Ir'Ii ~J$7] 75G 11/74 i Drill Pipe or Tubing ................ Reversing Sub ...................... Water Cushion Valve ................ Drill Pipe ........................ Drill Collars ...................... Handling Sub & Choke Assembly .' ..... Dual CIP Valve ................... Dual CIP Sampler .................. Hydro-Spring Tester ................ 2 7/8" 1, 11 Multiple CIP Sampler ............... ~,, fixten~ion Joint .................... AP Running Case .................. 5" Hydraulic Jar .................... VR Safety Joint .................. Pressure Equalizing Crossover ......... 11 Packer Assembly ................... 8.18" Distributor ........................ Packer Assembly ................... Flush Joint Anchor ................. Pressure Equalizing Tube ........... Blanked-Off B.T. Running Case ....... Drill Collars ...................... Anchor Pipe_ Safety Joint ............ Packer~ Assembly ................... Distributor ........................ Packer Assembly ................... Anchor Pipe Safety Joint ............ Side Wall Anchor .................. Drill Collars ...................... Flush Joint Anchor .................. Blanked-Off B.T. Running Case ........ Total Depth ....................... I. Do TICKET NO. LENG'rH 817578 DEPTH 3" 1' 4.37" 4'134' 180' 43i8' 4331' 4343' 4480' PBD. EQUIPMENT DATA L. ITTLE'$ gee7e 7~C ./~. ' TIME ' Each Horizontal Line Equal to 1000 p.s.i. ~- Ticket ~ FLU~ID SAMPLE DATA Date 7-14-76 Number 817581 Sampler Pressure .P.S.I.G. at Surface Kind Halliburton Recovery: Cu. Ft. Gas of Job HOOK WALL TEST District ANCHORAGE cc. Oil cc. Water Tester MR. BOWEN Witness cc. Mud Drilling Tot. Liquid cc. Controctor BRINKERHOFF DRILLING COMPANY PW Gravity ° APl @ °F. EQU I PM EN T & HOLE DATA Gas/Oil Ratio cu. ft./bbl. Formation Tested RESISTIVITY CHLORIDE Elevation 64 ' Ft. CONTENT Net Productive Interval 3562' - 3582' Ft. Recovery*Water __ @ °F. ppm All Depths Measured From 85' Kelly Bushing Recovery Mud __ @ __ °F. ----pprn Total Depth 3764 ' P. B ~ T.D. Ft. Recovery Mud Filtrate __ @ °F. ppm Main Hole/Casing Size 9 5/8" - 43.5# Mud Pit Sample @ 'F. ppm Drill Collar Length 180' I.D. 3" Mud Pit Sample Filtrate @ °F. ppm Drill Pipe Length I.D.2.441" Packer Depth(s) 351 61 .Ft, Mud Weight vis cp Depth Tester Valve 3496' Ft. TYPE AMOUNT Depth Back Surface Bottom Cushion Ft. Pres. Valve Choke 1/4"-½" Choke ,75" Recovered Feet of Reversed out. · Recovered Feet of Recovered Feet of Recovered Feet of Recovered Feet of Remarks Charts indicate Possible partial plugging during flow period. Opened tool with a medium strong blow, increasing to a strong blow. Fluid to the surface in 8 minutes - turned to gas-blowing gas-turning to gas and mud water- flowing on 1/4" choke. 850 PSI dropping to 350 PSI - dead. Closed tool at 9.05. P~Jll~d lnn_~ at 11-25_ Gauge No. 489 Gauge No. Gauge 'No. TEMPERATURE TIME Depth: .'~.l~j~ Ft. Depth: Ft. Depth: Ft. 48 Hour Clock Hour Clock Hour Clock Tool A.M. Est. 1 ~20 °F. '-Blanked Off NO Blanked Off Blanked Off Opened 6' 14 P.M. Opened A.M. · ~Actual 'F. Pressures Pressures Pressures Bypass 11 ' 25P.M. Field Office Field Office Field Office Reported Computed ~ Initial Hydrostatic 1 61 7 163Z Minutes Minutes '.~ Initial 369 397 ~'c Flow ~ Final 1250 1414 171 161 _ Closed in 1 470 1478 140 1 50 -o~ Initial co ~o..- Flow FinaI Closed in initial ~ Flow ~. _ Final -- Closed in Final Hydrostatic 1617 1632 ........ -- FORMATION TEST DATA t. ITTLE'~ 96671 tOM 8/74 Ga.ucje No. , 489 , Depth,, 3508' Clock No. 10054 48 h.our No. 8' 758l .... ..,,, First First Second Second Third Third Flow Period ClOsed In Pressure Flow Period Closed In Pressure Flow Period Closed In Pressure Time Deft. PSIG Time Deft. t ~- e PSIG Time Deft. PSIG Time Defl. t -J- ~ PSIG Time Defl. PSIG Time Deft. t-f-8 PSIG.~ Temp. Log Temp. Temp. Log Temp. Temp. Log Temp. .000" Corr. .000" 8 Corr. .000" Corr. .000" ~ Corr. .000" Corr. .000"~ Corr. .......... o . 000 397 .000 1414 1 .259 1414 .0161 1423 2 .0323 1429 ........ 3 .0484 1435 4 .0645 1441 5 0807 1446 ...... ,ai .0968 1451 7 ,,,.1129 1455 8 .1290 1458 9 .1452 1463 .... ~o .1613 1467 / .... ~ , , .1774 1471 ~/ . 12 ,,.1936 1476 ,,__ ~3 .2097 1477 ,,, ~4 .2258 1478 .... is .2420 1478 ,, , Gmuge No. Depth Clock No. hour o I 1 ............ 2 ,,, 3 , 4 5 6 7 9 10 1:2, _ ' Reodin~ lntervol , ,, ] 0 ............ Minute[ REMARKS: _ .......... SPECIAL PRESSURE DATA ,. Drill Pipe or Tubing ................ Reversing Sub ...................... Water Cushion Valve ................ Drill Pipe ........................ Drill Collars ...................... Handling Sub & Choke Assembly ...... Dual CIP Valve ................... Dual CIP Sampler .................. Hydro-Spring Tester ................ 2 7/8" 5.00" 5.00" Multiple CIP Sampler ............... Extension Joint .................... AP Running Case .................. 5o00" Hydraulic Jar ...... ............... VR Safety Joint ................... Pressure Equalizing Crossover ......... 5.00" Packer Assembly ................... 8. l 5" I. Do 2. 441" , , 3" TICKET NO. 817581 LENGTH DEPTH 180' 58.48" .75" 60. Z1" ~4Y§ ~ 3.06" 49.63" 3508' ] .00" 33.40" 4.06" 57.85" 35]6' Distributor ........................ Packer Assembly .................... Flush Joint Anchor ................. Pressure Equalizing Tube ............ Blanked-Off B.T. Running Case ....... Drill Collars ...................... · ~nchor Pipe Safety Joint ............ Packer Assembly ................... Distributor ........................ Packer Assembly ................... Anchor Pipe Safety Joint ............ Side Wall Anchor .................. Drill Collars ...................... Flush Joint Anchor .................. Blanked-Off B.T. Running Case ........ Total Depth ....................... 3764' P B T TIME Each Horizontal Line Equal to 1000 p.s.i. : ,,~. ~ Ticket FLUID SAMPLE DATA - ~.~ Dote 7-18-76 Number 8.17582 ,~- Sampler Pressure .P.S.I.G. at Surface Kind Halliburton Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE .... cc. Oil cc. Water Tester MR. BOWEN Witness MR. HAMMONE ??? cc. Mud Drilling Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY DR co '~ I Gravity ° APl @ °F. EQU I PM E N T & H aLE DATA "~ Gas/Oil Ratio cu. ft./bbl. Formation Tested - I RESISTIVITY CHLORIDE Elevation 64 ~ Ft. CONTENT Net Productive Interval 3562-3582' Ft. Recovery Water ~ @~ °F. ppm All Depths Measured From85 ~ Kelly Bushing Recovery Mud (~ °F. ----pPm Total Depth 4480" Ft. Recovery Mud Filtrate @ °F. ppm Main Hole/Casing Size 9 5/8'" Mud Pit Sample @ °F. ppm Drill Collar Length 180" I.D. 3" ????? Mud Pit Sample Filtrate~ @ °F. ppm Drill Pipe Length - I.D. Packer Depth(s) 3516 ' Ft. Mud Weight 8,8 Salt water vis cp Depth TesterValve - Ft. TYPE AMOUNT Depth Back Surface Bottom Cushion Ft, Pres. Valve Choke Choke Recovered 896 Feetof hole fluid · Recovered Feet of Recovered Feet of ~ c::: Recovered Feet of Recovered Feet of Remorks Opened tool for 94 minute first flow with a weak blow decreasing to dead. Closed tool for 177 minute first closed in pressure. Reopened tool for 127 minute second flow. Pulled loose C UTR-Unable to read Gauge No. 489 Gauge No. Gauge No. --I TEMPERATURE TIME I Depth:3508'Ft. Depth: Ft. Depth: Ft. 48 Hour Clock Hour Clock Hour Clock Tool A.M. Est. 120 °F. BlankedOff No BlankedOff BlankedOff Opened 1 '42771~.M. Opened A.M. _Actual 'F. Pressures Pressures Pressures Bypass C) .45 P.M. Field Office Field Office Field Office Reported Computed Initial Hydrostatic 1 617 1 622 Minutes Minutes -. *~o Flow Initial 221 239 ~ Fino~ ,.,221 239 120 94 Closed in 1348 1378 1 80 1 77 ~o Initial 221 252 ~.~ Flow' F~noi' 246 267 98 ]27 -- Closed in _ _ Initial ~ Flow ,, Final Closed in Final Hydrostatic 1617 , , , , .... FORMATION TEST DATA ,.,,-r,.,,.., ,,, ..... ,,,/,.,~ Gouge N.,,0. 489 ...... Depth 3508' ,,, Clock No. , 10054 48 ,,hour No., 8]7582 ,,. First I First Second Second Third Third Flow Period~ Closed In Pressure Flow Period Closed In Pressure Flow Period Closed In Pressure Time Deft. '[emp.PSIG Time Deft. Log t -J- ~)Temp.PSIG Time Dell. Temp.PSIG Time Defl. Log t -J- t~Temp.PSIG Time Defl. TemI~.PSIG Time Defl. Log t -f- I~TemD.PSIG .000" Corr. .000" ~ Corr. .000" Corr. .000" ~ Corr. .000" Corr. .000" ~ Corr. .... o .000 239 .000 239 .000 252 ~ .1'59 239 .0254 273* ....... .0455 248** 2 .0559 333 .0792 246 ' ~ .0865 427 .1129 249 ............. ~ .1170 551 .1466 250 ~ .'"1475 713 .1803 267 ~ .1780 8'90 .2140 267 ~ .... .2085 '" 1055 ,, 8 .2390 1189 ~ .... 2695 1300 " 10,,, .3'000 1378 .... "~ ' 12 ,, -, 13 14 , 15 Gouge No.. .... Depth , , , Clock No. , .... hour , 1 ..... 2 , , , , .... 4 , 5 6 ,, _ 7 8 9 10 . , 12 i ..... 14 ,, Reading Inte,rv,al, 18 20 ........ Minutes .,M^.KS: *-15 m~n'utes *'*-27 m~nutes. . . _ SPECIal PrESSUrE DATa TICKET NO. Drill Pipe or Tubing ................ Reversing Sub ...................... O.O. ~, I.D. LENGTH DEPTH Water Cushion Valve ................ Drill Pipe ........................ Drill Collars ...................... ,9 ~.00" 5.00" Handling Sub & Choke Assembly ...... Dual CIP Valve ................... Dual CIP Sampler .................. Hydro-Spring Tester ................ Multiple CIP Sampler ............... Extension Joint .................... AP Running Case .................. 5. O0n Hydraulic Jar ..................... 5.00" VR Safety Joint .................. Pressure Equalizing Crossover ......... Packer Assembly ................... 8. l 5 n Distributor ........................ Packer Assembly ................... Flush Joint Anchor ................. Pressure Equalizing Tube ............ Blanked-Off B.T. Running Case ....... Drill Collars ...................... Anchor Pipe Safety Joint ............ Packer Assembly ................... ,. Distributor ........................ Packer Assembly ................... Anchor Pipe Safety Joint ............ Side Wall Anchor .................. Drill Collars ...................... Flush Joint Anchor .................. Blanked-Off B,T. Running Case ........ Total Depth ....................... 180' 3.06" 1.00" 4.06" 3508' 3516' 4480J .......................... !~'/'~! lli~RAC'I%I'T' I-~A'r'A /ITTL'E~'$'IS~7675C'IB/7~4 ' TIME Each Horizontal Line Equal to 1000 p.s.i. · i Ticket '" FLUID SAMPLE DATA Dote -,7-10-76 Number 817579 Sampler Pressure .P.S.I.G. at Surface Kind Halliburton Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE cc. Oil cc. Water Tester JACK BOWEN Witness cc. Mud Drilling Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY SM Gravity ° APl ~ °F. EQ U I PM EN T & H O LE DATA Gas/Oil Ratio cu. ft./bbl. Formation Tested - RESISTIVITY CHLORIDE ElevationG 64'Ft. CONTENT Net Productive Interval - Ft. Recovery Water ~ @~ °F. ppm All Depths Measured From Kel ly bushing 85' Recovery Mud ~ @~ °F. ---~PPm Total Depth 6520' P1 ug back depth Ft. Recovery Mud Filtrate __ @__*F. ppm Main Hole/Casing Size 9 5/8" CSg~. Mud Pit Sample @ °F. ppm Drill Collar Length 180m I.D. 3m' Mud Pit Sample Filtrate ~) °F. ppm Drill Pipe Length 6176' kD. 2. 764" Packer Depth(s) 6381 m Ft. Mud Weight 9.'2 salt water vis cp Depth Tester Valve 0348' Ft. TYPE AMOUNT Depth Back Surface Bottom Cushion Ft. Pres. Valve Choke Choke Recovered 283 Feet of hole fluid . Recovered Feet of 3 Recovered Feet of Recovered Feet of ~< Recovered Feet of Remark, Set packer and opened tool at 6'50 with a medium blow decreasing to light blow. Closed tool at 10'30. Opened tool at 1'30 PM with a weak blow to dead. Closed at 3:35 PM and reopened at 6:35 PPi. Pulled loose at 7-00 PM. Hydrostatic pressure apparently by-passed prior to second flow period. Gauge No. 489 Gauge No. Gauge No. TEMPERATURE TIME Depth: ~)f~ ?? Fi'. Depth: Ft. Depth: Ft. 48 Hour Clock Hour Clock Hour Clock Tool A.M. Est. 1 ?l') °F. Blanked Off ,IlO Blanked Off Blanked Off Opened Opened A.~) _Actual °F. PreSsures Pressures Pressures Bypass -/' ~0 P.M. Field Office Field Office Field Office Reported Computed '"Initial Hydrostatic 2'935 2949 Minutes Minutes · .~o Flow Initial 24 73 ~'c Final ~ .. 172 195 220 188 Closed in 2886 2916 .... 180 189 ~ Initial 172 214 ~.~ Flaw F~no~ 192 220 125 67 ~ ....... Closed in 2715 2724 180 165 _ Il Flow Initial 197 230 ,, '~'~ F~no~ 197 232 25 88 )1-" Clos~.d in .... Final Hydrostatic 2935 2938 -- ---- ,,.. ,. , ii FORM IgI-RI--PRINTED IN U.$.A, FORMATION 'TEST DATA , I ,,1 ,, , Ill I , ,, , I, ,! II , I JII i "11 G, ou~e No. i 489 ....... Depth 6526' ?? ,., Clock No. i 10054 48 hour No. , 11817579 .i First First Second Second Third Third _ Fiow Period Closed In Pressure ,,Flow Period , Closed In, Pressure FIo,,w Period Closed, !n Pre,ssure Time Deft. PSIG Time Deft. Log t -f- ~ PSIG Time Deft. PSIG Time Deft. Log t -f- ~ PSIG Time Deft. PSI~ Time Defl. t -~- ~ PSIG Tamp, Temp, Temp, ~ Tamp, Temp, Log Tamp, .000" Corr. ,000" ~ Corr. .000' Corr. ,000' {~ Corr. ,000" Corr, .000" ~ Corr, o .0000 73 .0000 " 195 .0000 214 .0000 472 "0000 Z_,._,_ 230 1 .0551' 122 .0300~* 991 .0284***' 216 .0350**** .... 1125 ,0217 "~?~ 232 2 .1069 143 .0618 1639 .0451 217 .0617 ,1440 .0468 229 . , 3 . 1587 161 .0933 2143 .0619 217 .... 0883 1709 :,0718 2,29 4 .2105 171 .1250 2457 .0786 218 .1150 .,1940 .0969 230 5 .2622 181 .1567 2677 ....0953 218 .141.7 ..2129 ,1220 232 6 .3140 195 .1884 2820 .1120 220 .1684 .... 2295 .1470 232 7 .2200 2886 .1950 2432 .... 8 .2517 2907 .2217 2551 9 .2834 2914 .2484 .2650 . ]o ,, , .3150 ,., 2916 .2750 2724, / ...... 12 , , 13 ..... 14 . ......... 15 Gauge No. Depth Clock No. hour - o I 1 2 ,,, 3 4 5 6 7 8 10 11 12 13 ,,, 14 15 R;odin~l Interval "3'1 .... 1 91" , .... 1 0 ...... 1,6 ' ' 1 [; .... RE~RKS: *First int~'rval,, is equal to 33 minuS:es ** = 18 minutes. ~** = 1,7 minutes. **** ---"21 minutes. ***** I fill I I I Ill llllll I lllll I II I I i FORM I~31-R$--IIIRINT~ED IN U.'m.A. SPECIAL PRESSURE DATA [.ITTL. II"$ gelB73 75C e/74 , ' TICKET NO. 817579 · Drill Pipe or Tubing ................ Reversing Sub ...................... Water Cushion Valve ................ Drill Pipe ........................ Drill Collars ...................... Handling Sub & Choke Assembly ...... Dual CIP Valve ................... Dual CIP Sampler ........... i .... i . Hydro-Spring Tester ................ O. D~ ,. I.D. 3½" 11 11 Multiple ClP Sampler ............... Extension Joint .................... 5 ii AP Running Case .................. 5" Hydraulic Jar .................... VR Safety Joint .................. Pressure Equalizing Crossover Packer Assembly ................... 11. 8.18" Distributor ........................ Packer Assembly ................... Flush Joint Anchor ................. Pressure Equalizing Tube ........... Blanked-Off B.T. Running Case ....... Drill Collars ...................... Anchor Pipe Safety Joint ............ Packer Assembly ................... Distributor ........................ Packer Assembly ................... Anchor Pipe Safety Joint ' Side Wall Anchor .................. Drill Collars ...................... Flush Joint Anchor .................. Blanked-Off B.T. Running Case ........ Total Depth ....................... FO.bl ,I?-.I--..INTED IN U.I,.A. EQUIPMENT 2. 764"' 3" 3" 1" 4.37" DATA LENGTH DEPTH 6176' 180' 6348' 6526' ?? 6381' L. ITTf,.K'S g6676 7gC 8/74 · TIME Each Horizontal Line Equal to 1000 lO.s.i. ~- Ticket F L U I D S A M P L E D A T A Date -'~.u/'n-~c Number o,°~ 7577 Sampler Pressure .P.S.I.G. at Surface Kind Halliburton Recovery: Cu. Ft. Gas of Job }tOOK WALL District ANCHORAGE cc. Oil cc. Water Tester JACK BOWEN Witness cc. Mud Drilling Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY SM Gravity ° APl @ °F. EQU I PM E NT & H aLE DATA · Gas/Oil Ratio cu. ft./bbl. Formation Tested - RESISTIVITY CHLORIDE Elevation 64 CONTENT ~ Net Productive Interval 6608- 6638' Ft. Recovery Water __ @ CF. ppm All Depths Measured From Kelly bushing 85' Recovery Mud __ (~__°F. ~ppm Total Depth6655' Plug back depth Ft. Recovery Mud Filtrate __ (~ __°F. ppm Main Hole/Casing Size 9 5/8" CSg. Mud Pit Sample __ @__ °F. ppm Drill Collar Length 180" I.D. 3" Mud Pit Sample Filtrate__ (~__°F. ppm Drill Pipe Length - I.D. Packer Depth(s) 653]" Ft. Mud Weight 9.2 salt wat~er cp Depth Tester Valve - , Ft. TYPE AMOUNT Depth Back Surface Bottom Cushion Ft. Pres. Valve Choke 1/4-1/2" Choke, .87" Recovered 450 Feetof hole fluid Recovered Feet of Recovered Feet of Recovered · Feet of o- Recovered Feet of Remarks Set packer and opened tool with light blow for 5 minutes decreasing to a slight blow. , Gauge No. - Gauge No. - Gauge No. TEMPERATURE TIME Depth: , - F,t. Depth: - Ft. Depth: Ft. Hour Clock - Hour Clock Hour Clock Tool A.M. Est. 125 °F. Blanked Off - Blanked Off - , Blanked Off Opened 5'00 P'A~X Opened AXA~.X _Actual CF. Pressures Pressures .... Pressures Bypass 5' 00 P.M. Field Office Field Office Field Office RepOrted Computed -Initial Hydrostatic Minutes Minutes Initial ~_o Flow ~ ..... F~nal No B.T,recorders ran .... ran wirelin~ recorders Closed in ~ Initial c o Flow . ~'~ Final Cio~d in ~, , ~ Flow,, Initial ~... Final Closed in --'J~inol HydroStatic -- FORM ItlI.RI--PRINTEO IN U.S.A. FORMATION TEST DATA ,.,-r-,'-.,....,,,o../.,, ~'.~ ',.- _. TICKET NO. 8] 7577 Drill Pipe or Tubing ................ Reversing Sub ...................... Water Cushion Valve ................ Drill Pipe ........................ Drill Collars ...................... Handling Sub & Choke Assembly ...... Dual CIP Valve ................... Dual CIP Sampler .................. Hydro-Spring Tester ................ Multiple CIP Sampler ............... Extension Joint .................... AP Running Case .................. Hydraulic Jar ..................... VR Safety 'Joint ................... Pressure Equalizing Crossover ......... Packer Assembly ................... O. D. 5" 5" .. 5" 11 - 8.15" Distributor ........................ Packer Assembly ................... Flush Joint Anchor ................. Pressure Equalizing Tube ............ Blanked-Off B.T. Running Case ....... Drill Collars ...................... Anchor Pipe Safety Joint ............ Packer Assembly ................... Distributor .............. , .......... Packer Assembly ................... Anchor Pipe Safety Joint ' Side Wall Anchor .................. Drill Collars ...................... Flush Joint Anchor .................. Blanked-Off B.T. Running Case ........ Total Depth ....................... ,.,.,,-,,,,.... ,,,,...,,. ~(711 ! I DMr~NIT I. a. 11 .87" .75" 3.06" 1" 4.06" I-IA'T'A LENGTH 180' 58.48" 60.21" 49.63" 33.40" 57.85" DEPTH 6531' 6655' PBD LITTLff'$ ge~?e 7~C e/74~ ¢~--~I~-~v ~' " ~ CORE LABORATORIES. INC. Petroleum Reservoir Engineering DALLAS. TEXAS CORE ANALYSIS RESULTS Company Cl ti e s Servi ce Formation__ ~rell L_e_w|sRiver B - 1 Core Type Side Wall Field ..... ~'~ildcat Drilling Fluid Wafer Base County_ _Mot- Su StateAK .... Elev.__ , Location__ Lithologieal Abbreviations SAND - SD DOLOMITE - DOL ANHYDRIT E - ANHY SANDY - SDY FINE - FN CRYSTALLINE - XLN SNA LE · SN CH IrRT -"CH CONGLOMERATE. CONG SNALY · SHY MEDIUM - MED GRAIN - GRN LIM It. LM GYPSUM - GYP FOSSI LI FEROUS * FOSS LIMY - LMY COARSE - CSE GaANULAR - GRNL File BP -3-394 '~"- S- Analysts .. WSP GRAY-GY VUGGY-VGY FRACTIJe ~:O - FIRA: SLIGHTLY LAMINATION - LAM STYLOLI T lC - STY WITH - NUMBER FLEET PER CENT J O,C wA,ER Dns.~ 1 2662 142 27.0 0,0 93,0 2,70 2 2680 173 26.6 0,0 92,8 2.55 3 2830 64 32,4 0,0. 93,5 2.56 4 2352 131 29,6 0,0 93,4 2,63 5 3650 0,5 20.4 0,0 90,7 2.64 6 4241 226 24,2 0,0 94,3 2,56 7* 4362 0,0 24.2 0,0 94, 3 2, 65 8 4400 398 24.9 0,0 91,6 2,53 9 4602 14 22, 6 0.0 87, 6 2,73 10 4945 6, 7 22.2 0,0 93,6 2,69 11 5578 28 22.8 0,0 80.3 2, 70 12 6192 5.7 20.3 0,0 85,7 2,70 13 63:50 14.7 ! 9,9 0.0 94.5 2.67 14 643 4 17, 2 21.5 0.0 92,3 2,64 15 .5438 424 24.6 0,0 79,0 2,64 16 6495 56 23,5 0,0 87.5 2,65 17 6615 55 23,7 0.0 82.3 2,65 18 6618 67 24.7 0.0 85.1 2.68 19 6635 75 24.0 0.0 85.8 2.65 20 6646 114 23.1 O. 0 91.0 2.66 21' 6920 0.0 23.2 0.0 95.1 2.71 22 8240 6.5 21.6 0.0 92.2 2.68 23 8258 28 22.8 O. 0 92.5 2.67 24 8350 19 23,6 O. 0 94, 9 2.69 25 8370 60 22.6 O, 0 90.1 2.67 26* 8480 O. 0 17.5 O. 0 96.7 2.63 * Poor Sample SAMPLE DESCRIPTION AND REMARKS sand same sa me sand sand Siltstone; slightly sandy shale sand, lJgnitlc sand soPld same sa nd sa nd sand, sJighlty ca!careous sand, slighlty calcareous sand, chert nc~Jule sand sa nd sa nd sand shale sand sa nd sand ~ha]e These analyses, opinons or ';nterlr~retations arc based on observations and materials supplied by the client to whom. and for whose exclusive and confidential use. this report is made. The interpretations or opinions expressed represent the best judgment of Core Laboratories. Inc. (all errors and omissions excepted); but Core Laboratories Inc. and its officers and employees, assum.e no respo, nsibiljt}- and make no warranty or representations, as to the productivity, proper operations, or l~rofitableness of any oil, gas or other mineral well or sand m connectmn with which such report is used or relied upon. Form 10-403 Submit "Intentions" in Triplicate REV. 1-10~73 & "Subsequent Reports" in Duplicate STATE OF ALASKA 5. APl NUMERICAL CODE -- OIL AND GAS CONSERVATION COMMITTEE 50-283-20052. I D,,~ SUNDRY NOTICES AND REPORTS ON WELLS I ¢. ENO 1 ._ --F : (Do not use this form for proposals to drill or to deepen A~DL 58802 1 ~'~',JG use "APPLICATION FOR PERMIT--" for such proposals.) -~. ..... 1.OwlE%LD GAS N OTHER 7. IFNoneINDIAN, ALLOTTEE OR TH, IR: _~.Ai~IE/3, E/.~,? .... z NAME OF OPERATOR. 8. UN,T, FARM OR LEASE NAMELewis River B-'1 ; .'.Jr,,,~/~ Cities Service Company 3. ADDRESS OF OPERATOR 9. WELL NO. I ] 1016 6th Avenue, Suite 420, Anchorage, Alaska- #1 -~'--~ 4. LOCATION OF WELL 10. FIELD AND POOL, ORWILDC~,T I' ...... ~ G~.O~. Lewis River I REV Atsurface , ,_:.__ .', - 300' FNL, 1500' FEL, Sec. 10-T14N-R9W S.M. lZ. SEC.,T.,R.,M.,(BOTTOMHOL/O~.J.._E~cI~,E_)! .... Sec. 10-T14N-RgW S.I~ . CONFER: 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 12. PERMIT NO. .E, ILI:: _ 64' GR 76-31 CheCk Appropriate Box To Indicate Nature of Notice, Re )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF L-~ PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF.' WATER SHUTrOFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) .... (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. 50 sack cement plugs from 10,219-10,319, 9850-9950, 8550-8650. Ail tested zones capped with C.I.B.P. and pressure checked. ~laced 50 sx Class G plug with 2% CaC12 from 2500-2650. 14.4#/gal. Mud below bridge plug at 6700. 9#/gal. salt water between other bridge plugs. Cut 9-5/8" casing 5' below g.1. and pulled stub with pack off assembly. Cut 13-3/8" casing flush with 9-5/8". Set 10 sx. Cement plug in surface, welded dry hole marker and plate to 20" casing. Rig released midnight 7/21/76. Backfilled reserve pit, and will be prepared for state inspection after breakup 1977. (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: EnEineer DATE July 30, 1976 TITLE DATE See Instructions On Reverse Side l~rm No. REV. ~- I-?0 STATE OF ALASKA OIL AND GAS CONSERVATION COMMI~EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS oI~ ~ GAB WELL __ wELL ~ OTHER 2. :NAME OF OPEKATOR Cities Service Company 3. ADDRESS'OF OP~TOR P&A 1016 W. 61.h Avenue, Suite 420~. Anchorase~ Alaska 4. LOCATION OF W~T.T~ 300 FNL, 1500 FEL Sec. 10-T14N-R9W, S.M. SUBMIT ~ 13U'PLICAT~ ~ AP1 NL."MERICAL CODE 50-283-20052 e LEASE DESIGNATION AND SE-~IAL N'O. ADL 58.802 IF IIkIDIA~, AL,Oi iai; OR TRIBE NAME None 8.L.~IT FAI~ OR LEASE :NAME Lewis River B ' 10' ~l~.~.r~ A, ND POOL. OR WILDCAT Lewis River 'n s~c. T.. R.. ~,. ¢~orro~ o~ S10-T14N-R9W S.M. 12. P~LMIT NO 76-31 13. REPORT TOTAL DEPTH AT END OF MONTH. CI-IA,'~GES IN HOLE SIZE. .CASING AND C.I.I.I.I.I.I.I.I.I.~I~NG JOBS INCLUDING DE~'Y-H SET AHD VOLUMES USED. PER,FOHATIONS. TESTS A.N'D 'RESULTS FISHING JOI~ JU~"NK IH HOLE AND SIDE-TRACKED HOI~ AND A.NY OTI-IER SIGNIFICANT CI-LA~GIiiS I'N' HOI.~ C'ON'DITIONS DATE PRESENT'DEPTH July 1 10,056 2 10,130 3 10,234 4 10,319 5 10,319 6 6,700 'PRESENT OPERATION Trip out of hole for bit #36 Drilling Drilling, Mud Wt. 14.4#/g~t Logging, ran DIL, Formation Density Compen-' sated, Compensated Neutron, Proximity log, 1 side w;~ll core gun Plugging back. Plug F1 10,219-10,319 50 sx, Plug #2 9850-9950 - 50 sx, Plug #3 8550-8650 - 50 sx.. Plugging plan approved by John Miller, Department of Oil and Gas. Displacing mud with 9.0#/gal. salt water - Set CIB~ 67107 dump 2 sacks cement on top of same. TITL~ ~ ~c~m~C D~ July 30, 1976 NOTE ~Report on this form is recluired for ~ calendar ~th~ regardless ~. the stotu~ of ooeraf~, and must ~ f/fed In duplt~fe with the oil and gas conservatbn commiflee bythe 15~ of the succ~diflg ~n~, ~le~ otherwise directed. 7/5/76 7/6/76 7/7/76 7/8/76 719/76 State of Alaska Oil & Gas Conservation Committee Monthly Report of Drilling and Workover Operations Continued Page 2 . . 49 days Total Depth: 10,319 ' Present Operations: Plugging back ~,iud wt 14.4, vis 41, ~,.rL 6.8, Ct2 2300 PP~[, solids 26,% Remarks ~ ' ~ . · Loo~.~no 15 hfs LO drill collars 1 hr. TIH open ended 2-1/2 hrs.' CBU 2 hrs. Plug back as follow, s: Plug ~.-~1 10219-10319 50 sx, Plug f,-~2 9850-9950 50 sx, Plug ~,~3 8550-86'50 50 sx. 50 days . Total Depth: 10,3.19 ' PBTD: 6700 ' Present Operations' Displacing mud w/9.0,1~ salt water 1-1ual wt 9.0 +, vis 26, CL2 80~000 P~-~ .. Remarks: TOOH 1-1/2 hrs. LD 80. its DP 2 hrs. Cleaning pits, set.. BP @ 6710' and dump 2 sx cement 'on top' of same 15-1/2 hrs. TII'[ and tag plug 2-1/2 hrs. Displace mud w/brine water 2-1/2 hrs. 51 days PBTD: 6656' Present Operations' TOOt{ w/tubing. Remarks: Displace hole w/9.0~ salt water 1/2 hr., raix and condition salt water 2 hrs., circ. in pits 3/4 hr., pressure test BOP 2 1/4 hrs., circulate 1 1/14 hrs., TOOH w/DP 1 1/4 hrs., rig up Go Interaational and test blind 1 hr., parr at 6668-6670' w/4 shots/ft, and set E-Z drill retainer 6656-6658' 3 1/2 hrs., change BOP rams 1/2 hr., PU 2 7/8" tubing 6 1/2 hrs., rig up to cement 1 1/2 hrs., squeeze 6668-6670' w/75 sx 1 hr. Pressure formation'to 3000 psi. Fomnation broke and established injection rate.of 2 BP~x[ at 3000 psi. }[ixed 75 sx Class 'G" w/l% CFR-I.. Pumped in 70 gx squeeze pressure built to 3450 psi and held. Re%~---~e out 3/4 hr., TOOH w/tubing 1 1/4 hrs. 51 days Total Depth: 10,319' PBTD: 6656' present Operations: Trip in hole w/RTTS to test perf 6608-38' Remar~s: POOH w/ tubing 1-1/2 hrs. RU perf 1 hr. Perf. 4 holes 6605'' 1-1/2 hrs. Trip in w/RTTS 3 hrs. Pressure to 3000 psi, bled 2600 psi' 10 rain 1 hr'. POOH, LD RTTS 1-1/2 hrs. Perf 6608-38' 90 holes 3 hrs. Trip in hole w/RTTS and Hydrospring teste~ to 6567' 4-1/2 hrs. RU test equipment 1-1/4 hrs. Trying to set packer, failed 1 hr'. Trip to change tool 5 hrs. 52 .days Total Depth: 10,319' PBTD: 6656' Present Operations· Trip in hole with RTTS and hydrspring tester Remarks: Finished trip in hole with RTTS packer set @ 6553.'. Pres- sured annulus.to 2000 psi, held OK. RU swab, swabbed fluid to 4000' no fluid rise. (Unable to swab fluid below 4000' due to lack of power on swab unit.) Reversed out, POOI-[~ PU hydrospring tester. ~ow GIH with tubing dry. ': State of Alaska Oil & Gas Conservation Committee MonthlY Report of Drilling and Workover. Operations Continued Page 3 7/10/76 71~1/76 7/3_2/76 5'3 days ' Total Depth: 10,319' PBTD: 6520' (parr 6429-46') . Present Operations: Trip in hole ~ith test tools for test #2 Remarks: Finished trip in hole with 'test tools for test ~2. Opened tools with fair blow, increased to good blow~ dear in 25 min. Ran pressure gauge~ 200' fluid in hole, 115 psi. Open 3 hfs, SI 2 hrs. Then open w~a'~' fair blow, GTS 15 rain TSTM. Burned a lazy flare for 45 rain, went out. SI 3 hrs. Opened with fair blow, gas volume TSTM, no improvement in flow. POOH, set cast iron BP @ 6520'. Test casing! 2800 psi, held OK. Perf 4~ holes, 6460', pressured, to 2800 psi, de- creased to 2400 in 10 min. Perf 6429-46', 3 shots per foot. Now GIH: : with test tools. 54 days PBTD: 4480' (perf 4392-4418') " Present Operations: PreP to GIH for test #3 Re,arks: Results of test f~2: packer @ 6381, perf 6429-4~.- let flow period: Opem 3-172 hrs. Good initial blow, dead in 5 min. Ra~ pres-[ sure gauge~ fluid @ 6000', FFP 160 psi. SI 3 hrs 20 min. ~. 2nd flow period: Open 1 hr 55 min. Weak initial blow, continued weak blow thr.oughout flow period,' no gas. FFP 191 psi, fluid @ 5925'.! SI 3 hrs. 3rd flow period: Open 40 rain, no 'blow. FFP 203 psi, fluid @ '5890' ?OOH, set Bp_ @ 4480', perf 4 shots, 4428 pressured to 2000 psi. P. erf 4392-4418' 3 shots' per foot. 55 days · Total Depth: 10,319' PS'iD: 3764' Present Operations: ~-IOC Remarks- PU test tools and TIH 3-1/2 hrs.- Testing w/packer @ 4344' 10 hrs. TOOa, LD tools 3 hrs ' Set BP_ @ 3766', pet'S_ 3700' w/4 shots, set retainer @ 3690 3-1/2 hrs. Rig dov~a Go International and TI}[ w/tubing 2 hrs. Sting in retainer and try to circ to surface, did not circ~ mix 500 sx Class "G" w/300 sx 2% Ca C12, pump in formatio~ @ 3000 psi, standing pressure 2000 psi after pumping 1-I/2 hrs WOC 1/2 hr. Test- 4392-4414' ' ' let flow p~riod: Open 2 hrs, SI 3 hr 10 min. Open w/goo~ blow,. ..' decreased to very weak blow at end of flow period. 1~o show of gas. ' FL @ '4200' after open 1 hr. Flowing EHP 74 psig @ 4300' at end of flow period. ... 2nd flow period- Open 1 .hr 35 nih, SI 2 hfs Open w/no blo;~, very : weak blow at end of flow period. FBHP 78 ps~g in~.nediately after open- ~ing tool. FBHP 105 psig after ! hr 30 min. ': '3 rd flow period- Open 1 hr. 'No blow TO flow period. FBHP 110 psig. ~iu~nediately after opening tool. FBHP 116 psig @ 4300'. FL ~ 4050' at end of flo.w period. ' 7/13/75 7/14176 7/].5/76 7/16/76 State of Alaska Oil & Gas Conservation Committee Monthly Report of Drilling and Workover Operations Continued Page 4 56 ~ ways Total Depth: 10,319' PBTD: 3690' Present Operations' I'lOC Remarks ' 16 hrs. WOC 2 1/2 hr. Ran bond log & correlation log to 2400'o Cement top at 3200'. Very poor bond. 60% or less thru prospective pay. 1/2 hr. Perf w/4-way squeeze gun at 3550' 1/2 hr. Established injection rate 1 BPbI at 2000 psi. 2 hrs o TIH w/tubing & squeeze packer. 1/2 hr. Set packer at 3395'. 1/4 hr. ~.~ix and pump 150 sx Class 'G' w/.75% CFR-2 Standing pressure 1800 psi. 1 3/4 hrs. WOC 57 days Total Depth: 10,319 ' PB!D: 3690' Present Operations' On trip in hole with bit to drill cement Remarks' [.70C 6 hrs. POOH with tubing and packer. Ran Correlation Log and p'erf-4 holes Q 2725'. Ran tubing with RTTS packer set Q 2567', broke circulation behind 9-5/8". Mixed and pumped 200 s~: Class "G" + 27. CaC1. WOC 9 hrs. POOH with tubing and packer. PU bit and started in hole. 58 days · Total Depth: 10,319' PBTD' 3960' Present Operations- Prep to perforate @ 3548' with 4 way shot to squeeze · Remarks: D'rilled Out 125' cement-@ 2625' and 129' cement @ 34f~2'. Made short trip and circ hole' TOOH w/bit and DP. perf 3562-82' w/3 SPF. TI~! with test tool. Set RTTS @ 3516'. Open tool with gas to surface, 1000 psi through 1/4" choke. Calc volu,~e 1.5 Flowed to pit 1 hr making gas, water and filtrate wa~er. Turned to heater and separator for 56 min. l,;all loaded up with water and died. Circ hole and POOH with test tools. Ran CT_BP and set @ 3555'. · · ,:. 59 days .. Total Depth' 10~3'19 ' PBTD: 3350' Present Operations- WOC Remarks: Perf 35!~8' w/4 way s'queeze gun 1/2 hr. TI}[ for squeeze 2 hrs. Set RTTS packer @ 3395' 1/2 hr. ~i×ed 150 sx Class "G" w/.75% CFR-2, injection rate 2 BP~-! @ 2400 psi, formation squeezed ~ 3000 psi w/120 sx in formation 1 hr. WOC 8 hrs. TO0~[ 1-3/4 hrs. Perf @ 3350' w/4 way squeeze gun 1 hr. TI}[ w/RTTS packer and set @ 3176' 1-1/4 hrs. ~-[ixed 150 sx Class "G" w/.75% CFR-2, injection, rate 2 EPM @ 1800 psi, formation squeezed @ 2500 psi w/135 sx in formation 3/4 hr. WOC 7-1/4 hrs. 7/'17/76 7/18/76 7/].9/76 7/20/76 Alaska Oil & Gas Conservation Committee Monthly Report of Drilling and Workover Operations Continued Page 5 60 days Total Depth- 10,319' PBTD- 3350' ' Present Operations- Drilling cement @ 3220' " Remarks: WOC 1 hr. TOOH 1-1/2 hrs. Rig and perf @ 32'95' w/4 way squeeze gun 1 hr. TIH w/RTTS packer and set @. 3145 1 hr. ~s, ix 150 sx Class ."G" w/.75% CFR-2, injection rate 2 BPM @ 2400 psi~ could not squeeze~ overdisplaced cement 20 bb!s 1-1/2 hrs.. WOC 4 hrs. Mix 150 sx Class "G" w/2% CaC12, injection rate 2 BPM @ 2400 psi, formation suqeezed @ 3000 psi w/130 sx in formation 3/4 hr. .WOC 8-1/4 hrs. TOOff 1 hr. TiH w/bit 1-1/2 hrs. Drilling cement 2-1/2 hrs. -- · 61 days Total Depth: 10,319 PBTD' 3690' Present Operations: Tearing (3562-3582') Remarks- Drilling cement 14-1/2 hrs. Circ hole 1/2 hr. TOOH 2 hrs. Rig and perf 3562-3582' w/3 SPF 1-1/2 hrs. RU test tools 1 hr. TII{ w/tubing 2 hrs. Set DST tools @ 3516' and opened tool w/medium blow, 4 psi @ surface after 5 min. Surged t° pit 1 min. Pinched to 1/4" choke. Pressure built to 3 psi after 30 rain, 4 psi after 50 min. Ran Hewlett Packard bomb, found fluid @ 2480' 1 hr and 25 rain after tool open. Left tool open 2 hfs, 4 psi when tool SI. GTS after 1 hr and 50 rain, TSTM 2 hrs. Ta~.~ing SI .1/2 hr. 62 days Total Depth- 10~319' PB_~D- 3690' Present Operations: Flowing and testing (3562-3582') Remarks- SI test 2-3/4 hrs. Open tool and flow to bucket through 1/4" valve~ 4 psi on tubing, g~s TSTb[ 1 hr. Reverse out tubing 1 hr. TOOff 1-3/4 hrs. WOO 2-1/4 hrs. TIH w/RTTS tool and set @ 3535' 2-1/2 hrs. Breakdo~m form. ation' as follows: spot 2% l~aC1 water to packer, set packer, breakdo.:.m @ 5 BPM @ 2500 psi (no initial break- down pressure), pumped in 30 bbls @ 2500 psi, 5 BPM, IStP 1500 psi, 2 rain 1000 psi~ 5 rain 750 psi 3/4 hr. Swab hole down, estimated 25 bbls 4-1/4 hrs. Well sluoo~no~.~' ~ water gas and sand to pit 1-3/4 hrs. Swabbing and flowing to clean up, total recovery 50 bbls water~ no measurement on gas,. too wet to measure 6 hrs. .' 63' days Total Depth: 10,319' PBTD: 2720~ Present Operations- Testing (2655-2665') Remarks- 4-1/4 hrs swab testing: swabbed 15 ~.~ 1st 3 hfs, some gas w/swab. Swab broke dowa last 1-1/4 hrs. 5-3/4 hfs SI test. Ran Hewlitt Packard bomb after 2-1/4 hrs. Hours BHP Hours BHP 2-1/4 2-1/2 2-3/4 3 3-1/2 1192 psi 4 .1297 psi 1214 psi 4-1/2 '1318 psi 1232 psi 5 1337 psi 1246 psi 5-1/2 1353 psi 1273 p_s.c~.~ 5-3/4 1360 Es~ 7122/76 Alaska Oil & Gas .~ff~.servation Committee Monthly Report of ~.~illing and Workover Operations ~ontinued Page 6 1 hr pull Hewlitt Packard BHP bomb. 5 hfs swab testing: 1st hr recovered 15 BW, very little gas with s.wab. ' 2nd hr recovered 5 BW, very little gas with swab. 3-1/2 hr recovered 5 b~, vet)- little gas with swab. 5 hfs recovered 0 BW, very little gas with swab. Swab dry, well dead. 2-1/2 hfs TOOH w/tubing. 3/4 hr set BP @ 2720' 1-1/4 hfs pe=f @ 2655-2665' w/3 SPF. 2-1/4 hfs TIH w/test tools and '"' set @ 2591'. 1-1/4 hfs testing. Open tool w/medium blow, surge to pit after 9 rains. No blow after putting through 1/4" valve. After tool open 38 rains, 1/4" water kills well. Shut tool in' after 1 hr. Presently taking SI. ' 64' days Total Depth: 10,319' PBTD: 2500' Present Operatior~s: Laying do~o. DP Remarks: SI testing 3 hrs. Open flow testing 1 hr. TOOH 1-1/2 hrS. LD test tools 1/2 hr. TI[[ to plug 1/2 hr. Set 150' plug 2500-2650' w/50 sx Class "G" and 2'/~ CaC12 1 hr Lay-do:..rn DP 5-1/2 hrs. 65 days . i Total Depth: 10~319' Plugged and abandoned Present Operations: Cleaning mud tanks and tearing down rig Remarks' Finish LD drill pipe 2 hrs. Cut casing off 5' below Well- head 2 hrs'. Nipple down BOP's and wellhead 6 hrs. Set 10 sx cement' plug @ surface 1 hr. Set dry hole marker and cap casing 1 hr' Well plugged and abandoned @ 4:00 PM3 7/21/76 Alaskan time. F IbL&L REPORT 7123-7125/76 Rigging down rig. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WOR'KOVER OPERATIONS 1. WELL WELL OTHER ~..~E OF Cities Service Company 3. ~nb~ss OF OPm~TOR SUBMIT IN DUPLICATE 1016 W. 6th Ave.~ Suite '420, Anchorage. AK 99501 300 FNL, 1500 FEL Sec. 10, T14N, R9W, S.M. J I.C. GEOLI"I-~-'GEOL ADL 58802 J.~.'~--4 r~,,!o- 8. L~IT FARM OR LEASE N~E r Lewis River B 9 WELL NO 10 ~IF2L,D ~.N~D POOL, 0tt WILDCAT I.owS~ R~ ver =~] SEC. T.. m. ~. (~OM HO~ o~ 1 G -~.:', .,L CONFER: ~ , , S10~ T14N, R9W, S.M. 12 P~RA~IT NO 76-31 13. REPORT TOTAL DEPTH AT END OF MONTH. CHA~NGES IN HOLE SIZE, CASING AD C~NG JOBS INCLUDING DEP~ SET ~ VOL~ USD. P~O~TIONS. ~TS ~ ~SUL~ FISHING JO~ JL~K ~ HO~ AND SIDE-~ACKED HO~ ~D ~Y O~R SIGNIFIC~T ~~ ~ HO~ ~ITIONS DATE PRESENT DEPTH PRESENT OPERATION June 1 4368 Drilling 2 4953 Drilling 3 5472 Tripping 4 5965 Drilling 5 6349 Drilling 6 6641 Drilling 7 6911 Drilling 8 7140 Drilling 9 7426 Trip for 10 7737 Drilling 11 7995 Drilling 12 8220 Drilling 13 8505 Drilling 14 8600 Trip out 15 8600 Logging 16 8600 for bit #15 bit #20 - Test BOP to 2000 psi DIVISION OF Ofl~ AND GAS to log Prepare to run 9-5/8" casing, ran Dual Induction linear, Bore hole compensated sonic with gamma ray, Formation Density Compensated, Compensated Neutron, 4 Arm Digital Dipmeter, Proximity log, and 1 side wall core gun 17 8600 14. I hereby SIGN'ED NOTE --Report on this form is required for each calendar montht regardless of the status ot -O~woti~s, and must ~ filed in duplicate with th e oil and gas conservation committee by the 15th of the succNding month, u~le~ Otherwise directed. Running wire line to tag stage collar dart, ran 9-5/8" casing in the following order. Tally Depth 1 Differential fill float shoe 2.25 8556.71 2 its 43.5 # S-95 Lt&c 88.51 8554.46 1 Differential fill float collar 1.90 8465.95 14 its 43.5 S-95 LTC 626.05 8464.05 State of Alaska Oil and Gas Conservation Committee Monthly Report of Drilling and Workover Operations cont. June 30, 1976 Page 2 DATE PRESENT' DEPTH PRESENT OPERATION June 17 8600 cont. 35 its 47# S-95 LTC 1 jt 47# S-95 LTC x Buttress X-0 27 jt 47# N-80 BUttress 1 Baker DV collar 130 its 47# N-80 buttress Casing collar 5' above cut point - 5.00; Casing point - 8556.71 Tally Dep.~ 1585.86 7838.00 41.80 6252.14 1066.85 6210.34 1.83 5143.49 5146.66 5141.66 Ran 4 casing centralizers, cemented stage 1 with 1475 sx class G with 1% CFR2 and 0.2% HR-7. Dropped dart to open stage collar but would not open. 18 8600 Waiting on cement. Tagged stage collar dart at 3960 and bumped to 5143. Pumped thru stage collar at low rate 1000-1500 psi with no returns. Squeezed 2nd stage cement with 200 sx class G with 0.1 HR-7. 19 8600 Drilling DV tool and building mud volume. Test Hydril to 2500 psi pipe & blind rams to 3000 psi. 20 8625 Circulating and bringing mud weight to 12.0#/gal. Tested Casing to 2500 psi for 15 minutes. 21 8733 22 8910 23 9020 24 9152 25 9285 26 9546 27 9769 28 9892 29 9892 June 30 9915 I hereby certify that the ~ng Signed ~,~~ ,~ Drilling Drilling Drilling Drilling Drilling - Tested Hydril to 2500 psi - BOPE to 5000 psi. Drilling Drilling mud weight 12.5#/gal. Shut in and raiSing mud weight Tripping for bit increased mud weight to 14.2#/gal. Tripping for bit ~t~ GAS is true and correct Date~ /' /~ ~on~ No, P---4 ~'. ~- 1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN D~. LICA"F~ MONTHLY REPORT OF 'DRILLING AND WORKOVER OPERATIONS 2. NAMEOFOP~?,.ATOR Cities Service Company 3AD~SSO~"O~/m~TO~ 1016 W. 6thAve., Suite 420~ Ancbora~ qqS~l 5 AP1 NU~![ERICAL CODE 6 L~ E DESIGNA~ON AND I - I J ADL 58802 is. L~IT F.~{ OR LEASE I . . J Lewzs Rxver~: J "l ~_10 ~ ~ iND P~L. OR 300' FNL, 1500' FEL Sec. 10, T14N, R9W S.M.oMStoNJUNoF oILS tgl~JAND ,iii m. ~,+S10~°' T14N, R9 GA~ 76-31 - , sst ~ vo~ ~s~. ~o~t~o~s. ~s ~ ~s~'~ts ,sm~ ~o~ ~ m ~o~ ~ sms-~c~ ~o~ May 1 - May 11, 1976 May 12 - May 16 May 17 May 18 May 19 May 20 May 21 May 22 May 23 May 24 May 25 May 26 May 27 May 28 May 29 May 30 May 31 Building location and drilling water well. Rigging up Finish rigging up, drove 30" conductor to 60'KB Spud 6:00 p.m. - 5/17/76 167' - Drilling with 26" bit 378' - Conditioning 26" to run 20" 378' - Nippling up to 20" casing, ran 9 joints 20", 94#, K-55 Buttress thread and set at 371' RKB. Cement with 600 sxs class G with 2½%!gel and 2% CaC12 followed by 200 sxs class G with 2% CaC12. Good circulation throughout, cement to surface. 593' - Drilling 17½" hole 1224' - Drilling 1375' - Drilling reduced hole size to 12¼" 2128' - Drilling 12¼" hole 2408' - 12¼" hole. 1734'P.D. 17½" hole opening hole to 17½" 2408' - Rigging up to run 13-3/8" casing. Logged from 2408' - 371'with Dual Induction Laterolog 8 2408' - Nippling up on 13-3/8" casing. Ran 383' 61# K-55 Bottom~2019'54.5# K-55 Top,total of 2402'. Cemented with 1200 sx class G with 2½% gel and 2% CaC1 tailended with 200 sx class G with 2% CaC12. Cement circulated to surface. Pulled 100,000# tension on pipe and set slips. 2408' - Completing state BOP test of all equipment to 5000 ps~wittnessed by Harold Hawkins, Division of Oil & Gas 2408' - Drilling cement and shoe 3230' - Drilling 3862' - Tripping in hole with bit #13 14. I hereby~ ~ that th for o, g is e s~G , .. ~-_ '-'~ ' , ~ =Tn~ En_~n~r _~. nA~ June. 3,. 1976 NOTE--Report on this fora is re~utred for ~ch calendar ~th~ regerdless of the etatus of operations, and must ~ filed in dupli~te with the oil and gos conservatbn commiflee by the 15~ of the luoc~din9 mn~. ~le~ otherwise directed. STATE '"of AI.ASKA DEPARTMENT OF NATURAL RESOURCES Division eib. Oil and Gas ~o: F O. K. Gilbreth, Jr./ Director /~~ lhru- Hoyle H. Hamil ton Chief Petroleum Engineer FROM: Harold R. Hawkins Petroleum Inspector DATE ,June 4, 1976 SUBJECT:BOP Test<ewis Rive~ B~- ~and Abandonmen~F~--~E~~S Ri ver # 1 May 27, 1976 - Departed Anchorage at 2:00 PM with Petco Aviation for Beluga River. Arrived at Beluga at 2:30 PM. b~ith me was Ed Barber from the Division of Lands. Randy Hicks, the operator for Cities Service, met us. He drove us to Lewis River B-1. They were nippling up. Time - 3:00 P~q. 3:00 PM, May 27, 1976 - Randy Hicks, Ed Barber and I went to East Lewis River #1 ~'o 'i~'s'p~ct ~:he lo'cat~'ion for abandonment. The well marker was in place, and loca- tion data, etc. was OK. But the location in general was not OK for final abandonment. There was quite a bit of debris on location and several l. ow spots to be leveled plus the mud pit was not completely filled. We will be contacted for final abandonment at a later date when they can fill the Pit with due safety as the surrounding ground is soft. 5:00 PM - We went back to Lew~is River B-1. I toured the location, reserve pit was well built and bermed. The fuel tanks are steel but not bermed. The location in general is very clean. 6:30 PM- Toolpusher Mr. Dunham for Brinkerhoff and I checked the Swaco superchoke and actuated it and it was working fine. 7:20 PM - Toolpusher and I checked the nitrogen bottles. They tested at 900, 950, 975, lb~. There were only 3 manifolded up. They are to replace these bottles, plus adding one more backup in the manifold. Master gauge on the accumulator was 1350 lbs. Time 7:45 PM. 4:15 PM, ?iay 28, 1976 - b~e started the BOP test. The blind rams were tested to '~000 lbs. and three ~ing low torque valves on the choke manifold tested 5000 lbs. Two manual choke valves on the manifold operated freely. We had one failure - one McEvoy valve bonnet was leaking. Time - 5:00 AM. The McEvoy valves all held on manifold to 5000 lbs. Two wing valves on the kill line and one wing valve and check valve were tested to 5000 lbs. The spool has 3" outlets. 5:20 AM - They are opening blind rams and getting ready to set McEvoy plug to complete test. They also have remote control on the floor that is working fine. 8lind rams opened and closed approximately 5 seconds. O. K. Gilbreth, Jr. ~I.. R. Hawkins - Field Trip Repert ,~ii~~ -2- mane 4, 1976 5:3~ AM - Plug was set. Pipe rams closed approximately 5 seconds and pipe rams teSted'to 5000 lbs. $:00 AM- Pipe rams opened and the bag on the hydrtl was closed and tested to ~-lbs, and held. 7:~ A~.~.L' Upper kelly was tested to 2200 lbs. 7:45~- Lower kelly was tested to 2~0 lbs. Both held test. In conclusion, the test was very good.. June_ 2, !976 - John Miller informed ~e that Randy Hicks called June 1, 1976. Th:~FP~n'i-t-~ bottles have been replaced and one more backup put in and mani- folded up. Attac.hment ~::.:...::ves. :~. ~0. _:~te~:-~:(':).::~ocat~o~,~era~ ':.-:::.:' .: ".' ':".ves". ~o.":'~' (.~BO~ .~ :... :.' ..:-:.-:". ~:tl:~::i':_ ..(. ) .::(:".~'' 2:'-Generai Housekeepinq''F ' ' (). ( ) . 1'6:' ~ f'lui~-( )w~~ud :::?:-' _~ )-'-.( )' ~.: ReServe Pi.f( )open~ )fi-~.~ed ~ ( ) ~7. Master Hyd, Cont[°~[yJ.,-/~YOpsig. :.'.: (). (-)'-', ~.'SurfaCe:NO. We~s ..:. () () ;' '.'_ ~:~ - · :':- ( ) ( ) .- 6. Subsurface-No.. We~ '~) ( )' 21. Kill Li.ne-( ) CheCk valve :" " (') Well Test Data ~ ( ) ( ) 22 'Choke Flowline ( ) HCR va'lve~~ ~.. ( ) (.) 7. Well Nos. , ., , [, ( ) ( ) 8.' Hrs.. ob. ser......, , ,.. . (-) ( ) . 9. BS&W ~:-'i ,--,-- ( ) ( ) lO,-.Gr. Bbls. (~i) Fi nal Abandonment ( ) ( ) 23. Choke.' Ma~.~fold No./valvs ' fl.os ~) () 24 Chokes-( )Remo.te(~),Pqs/(-~dJ.--- (~L) ( ) 25., T.est :P1 up-.( )iW~:l l.hd(J~..csg( )none 0<) ( ) 26' Annular Pr.eventer~si.e ..~I ( ) 27. Blind Rams~,p,~ps~e ( ) ( )- ll P&A Marker ( ) 28. Pipe Rams ~:m~m psiq ( ) ( ) 12. Water well-( )capped( )plugged (X) ( ) 29. Kelly & Kelly-cock,~2~;0psig ( )' ( ) 13. Clean-up (.~) ( ) 30. Lower Kelly valve~m~sio ( ) ( ) 14. Pad leveled (~) ( ) ~21 Safety Floor valves-(~V '(~art Total inspection observation time hrs/days Total number leaks and/or equip, failures -Remarks ~ / //) (.,_~ ~f~' ~ ,(~ m.7' ~ ,~ f ~ ~ ~'~ ~.~ ~"/~l~X~f~ ~-~ D ,:~//~: '~ ~0/..~ ~ ~'~z-~ .~<~/~. .. ~mT,~:. ~o :.~~~2_ ' .' ~ ~ .... Ch',~A~,o~, '/gM-Z/~' Notify in ~da~s or when ready Inspected by/l,4 ~'IM/~: Date:,./2~/.~ Form Z0-403 ' Submit"Intentions" in Triplicate · ' -- '1 REV. 1-10~73 & '*Subsequent Reports" in Duplicate :-- -'c -~O'L"- STATE OF A~SKA 5. APl NUMERICAL CODE [ C.-ENG OIL AND GAS CONSERVATION COMMITTEE 50-283-20052 I] ''~ ~,<~ SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen U.e"~,,UC~T~O- ~O,,E,~--" ~or.uc, ~ro~o.=~..) AD~ 58802 NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME ~ ? ~.-;-;~[ ~'~ Cities Service Comoanv · Lewis River ~ .~. I...3 ~;~;~L ] ..... 1016 W. 6th Ave., Ste. 420, Anch., AK 99501 ~ 1 ~oc~,o. o~ w~ ~0. ~,~ ~.~ .oo~. o. ~,~c~ a~ su r~ac. Unnamed 300' FNL, 1500'FEL, Sec.10 T14NR9W S.M. ~.SEC..T..R..M..(SOTTOMHOL~~~ ......... S10T14NR9W S.M. [~V~TIONS (Show whether DF, RT, GR, etc.) .. ~ 12. PERMIT NO. 64' Gr. 76-31 14. CheCk Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT'REpo RT OF = FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING SHOOT OR ACIDIZE ABANDON* SHOOTING OR ACIDIZING ABANDONMENT* REPAIR WELL CHANGE PLANS (Other) (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. It is planned to set 9-5/8" at' 8500'. The following casing string is proposed. Size'hole 'Size'casing Wt--. 'Gra'de ~'hre'ad 'L'e'ngth 'Depth 12¼ 9-5/8 47 N-80 Buttress 6437 6437 12¼ 9-5/8 47 S-95 LTC 1342 7779 12¼ 9-5/8 43.5 S-95 LTC 721 8500 1976 DIVISION O~ OIL AND OX;; 16. I hereby ce. rtifYt.t~l[at the foregoing SIGNED ~ TITLE Engineer DATE May 11,. 1976 (This space for State ~:e use) CONDITIONS OIr.~PI~ROVAL, IF ~1~' ~.- TITLE See Instructions On Reverse Side Approved Copy Returned 3001 Peecuptne Drive, Anchorage, Alaska 99501 Apr11 gO, 1976 Re: Lewls Rtver B iq Ctties Servtce 0tl Co~pany State Permlt No. 76-31 Rtchard O. Berg Operations ~nager Ctttes Service 0tl Company 1016 West Sixth Avenue Anchorage, Alaska 99501 Dear Sir: Enclosed is the approved application for permit to drill the above referenced well at a lecatton in' Section 10, Township 14N, Range gW, SM. Well samples, core chips and.a mud log are not required. A directional survey is not required. Many rivers in Alaska and their drainage systems have been classified as Important for the spatmln.g or rmlgratlon of anadremous fish. Operations in these areas are subject to AS 16.50.870 and the regulatt.ons premulgated thereunder (Title 5, Alaska Administrative Code), Prior to commencing operations you may be contacted by the Habitat Coordtnator'.s office, Oepart- ment of Fish and Game. Pollution of any waters' of the State is prohibited by AS 46, Chapter 03, Arttcle 7 and the regulatlens prolmulgated there.under (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. Pursuant to AS 38,40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a representative of the Oiviston may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. Apr11 ~0, 1976 ~ ~ e~eat of s, speasi~ ~ ~~t please give thts offtce adequate ~v~ not~¢icatt~m ~ that e may haw a Nit.ss present. Very t~aly ~, ~ O. g. ~l~mth, ~r. Alaska 011 a~: ~ ~~qratton ~tttee ~clo~ CC: Depart ef Fish a~d'~. Hab-t~t ~t~on w/o e~cl. Oepar~,t of E,vtrenmen~1 Conservatto~ w/o ~cl. Oepar~t of La~, Supervisor, Labor Law Compliance O~vtstoa w/o ~1:. DEPARTMENT OF NATURAL RESOURCES April 14, 1976 Cities Service Oil Oompany 900 Colorado State Bank Bldg. 1600 Broadway Denver, Colorado 80202 Re: LO 76-16 L~is Ri~tr B #i JAY $. IIAMMO~YD, GOVERNOR The plan of operations outlined in your letter of March 2, 1976 is hereby approved subject to the following stipula~ons: 1. Solid was~eS (garbage, trash, etc,) and sanitary wastes mas.t be disposed of in compliance with standards set forth, by ............ the Alaska Departn~nt of Enviror~.~tal Conservation .... ' · -': - -- ' -' ':-' ~ · ~ -i ." . .' . ~::":~-:: ............ ~-' - ' 3. All oPP~ating areas s1~11 be maintained and.upon acmpletion of operatians left in a condition satisfactory to the Director. 4. A completion report shall be filed within 15 days of ccm- pletion of operations. Sincerely, Chief, Minerals Section' 1976 DIV'i§[OI,,J OF OIL AND GAS "1776-A TRIBUTE FROM OUR STATE TO OUR NA TION-1976" of ALASKA DEPARTMENT OF NATURAL RESOURCES Division of Oil and Gas TOil FROM: Pedro Denton Chief, Minerals Hoyle H. Hamilton ~ Chief Petroleum Engtnee DATE , March 31, 1976 SUBJECT: (L0 76-16 ) .,Cities Service Co. Lewis River B #1 Sec 1 O, T14N, R9W, SM. The plan of operations for subject well dated March 2'm 1976. has been reviewed by this Dtvision,.,~found to..be adequate, and we hereby recommend its approval STATE of ALASKA TO: F FROM: Kyle Cherry - D~C O. K. Gilbreth O&G Pedro Denton Chief, Minerals DATE SUBJECT: To date we have not received any ~ts from you on the above referenced lease operation application. Your timely sufm~ttal be appreciated. .,!.. 1976 ~ISiON OF OIL AND OAS 02.001B STATE of ALASKA TO: ~- FROM: Bruce Barrett - ADF&G Ky le Che~ - DEC Ed Barber - SCDO DA~ : March 9, 1976 O. K. Giibreth- O~G  SUBJECT: ~0 76-16 Pedro Dent~ L~ River B ~1 Chief, Minerals Section cities Service Cc~ ~ to drill in tt~ Lewis River =ea · . I, iA, R1 ,1976 ULUJ C~ITIE$ SERVICE COMPAH¥ 900 COLORADO sTATE BANK BUILDING 1600 BROADWAY March 2, 1976 ($0:~) 8g2-OZ63 state of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: Please find enclosed our Application for Permit to Drill the Lewis River B ~1 to be located in Section IO-T14N-R9W, S. M. Also enclosed are the following items: 1. Location plat; scale 1" = 1 mile 2. Location plat; scales as shown 20" ing set at 3. Drawing of BOP stack arrangement with cas 350' 4. Drawing of BOP stack arrangement after setting 13-3/8" 0~ casing at 240 5. Drawing of BOP stack arrangement after setting 9-5/8" casing at 7000' 6. $100 check for filing fee If further information is required, please advise. Very truly you.rs, Richard O. Berg operations Manager Western Region ROB:kl Enclosures i~rm I0-- 401 REV. I-I--71 STATE OF ALASKA ' 1S. TYrB or womK b. ?TPE OF W~./. OIL AND GAS CONSERVA.TION COMMITTEE ,. PERMIT TO DRILL OR DEEPEN DEEPEN J--J DRILL [] SUflMIT IN TRIP, ~'['~ (Other Instructions on reverse AP I # 50-283-20052 e. LEASE D~IGNATION ~ SEi?AAL NO. ADL 58802 I.IFINDIAN. kLJ.~TTEE OR TI:?ABE NAME None 8.UNIT FARM OR LEASE NAME Lewis River B g. WELL NO. #1 10.FI~D AND POOL, OR WILDCAT Unnamed 11. SEC., T., R.. M., - HOLE OBJECTIVE} O,L [---] WiLL WKLL OTHmR· I~INGI,m [~ MI'I.TIPI,E ~__] ZONI ZONE 2 NAME OF OPEH. ATOR Cities Service Company 3. ADDRES,S O~F OPERATOR 1016 West 6th Avenue, Anchorage, Alaska 4. LOCATION OF WELL At surface SeCtion 10-T 14N-R9W, At proposed prod. zone 9950,1 S. M. Same as above 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 50 miles west of Anchorage 14. BOND INFORMATION: TYPE blanket Surety a.d/or No. 603-382-223 15. DISTANCE FROM PROPOSED* {16, NO. OF ACRES IN .LEASE LOCATION TO NEAREST PROPERTY OR LEASE LINE. FT. 1500 ' 1280 (Also to nearest dr(g, unit, if any) 18. DISTANCE FROM PROPOSED LOCATION' 19. PROI~SED DEPTH TO NEAREST WELL DRILLING, COMPLETI~D. OR APPLIED FOR, FT. 49661 10,0001 21. ELEVATIONS (Show whethcr DF, RT, CR. etc.) GR Se.c, 10-T14N-R9W, S, M. 12. ~.o,,-, $100 ~ 000 i?. NO. ACRES ASSIGNED TO THiS WELL 640 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX, DATE WORK WILL START* May 1, 1976 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING~ WEIGHT PER FOOT GRAI)E SETTING DEPTH quantity of cement " Driven ~ 30" Line pipe 40' TVD None 26" 20" 94# ": H-40 350' TVD 600 cu'~ic.....feet c 17-1/2" 13-3/8~' 61# K-55 , 2400' TVD 2140 Cubic fe..et ' C,~, ~,7/, ]7-]/2" 13-3/8" ~ 54.5# K-55 1950' TVD 12-1/4" 9-5/8" 43.5# P-Il0 7000' TVD 4000 c'ubic fe~t 12-1/4" 9-5/8" 47# N-80 6400 ' TVD 8-1/2" 7" 29# S-95 10000' TVD (3200' Liner) 650 cubic feet The BOP schematic as shown in'the drawings will be nippled up and tested after each string of pipe is run. A choke manifold with two adjustable chokes and a hydraulic choke will be used. (This space for State office use) [] '""~ ~NO ~ ABOVE SI~ACE D~SCl~BE I~ROPOSED pROGRAM: If ~l is to dee~n give ~ on present p~u~ive zo~ ~d p~ ~w prffdu~ive ~ne..l~p.~l ls ~ drilL or a~n d~[onaliy, give ~rt~ent ~' on s~bsu~a~ ~t~ ~d meas~4 ~d ~ue ve~ical ~P~. Give bio.ut prevepter~pmgram. her,by ~e/tiiy t~it the ror~ng !~ ~e ~ Corre~ sm~~. . ~ Hatch 2, 1976 ~ 0perat~ons Hanager CONDI~ON8 OF ~PROV~, IF A~: SAMPL~ AND CORE CHIPS H~U~ m MU.D LO'~ ~ ~U~~: . - J'3 .- Zoo z - . ~ . f/ . '2TM . . ..~o~a~'~~/~,-~- .m .... Ch~,lrman ~.~ April~ 1976 ......... ~~ I.~o., ~ Revere Side . DJ} YtJU ~'~AttT. TO ~?~TFP.,. ., DATA FRO~4. A FILE?NO . ' . . . 0,..) 2 ?,,~ TEi.' ....... 5E CT I Oi'i S PFC5: ('~ ~A (')E, i'.l E l GdT, LEi.,i~H' i, T VD-[)EPT?I, Y I ELD, C Of I A PS <, ~' D~'tJ i-~ST ? 110~ 43.5 ~ 600~'1000~ I I ()6~ 44b()~bTO0 ?(::~0~ 4 1~6400., 6,~()0~ 1 i 61 t 4"150,6u70 C^S I l:,t(} DE510i'4 FOR i',!dl) iiE IG!'--F.[' =10. <5 ESTI ~,~ATE:.i] 5URi:ACE 9· LB./GAL PRESSURE ~, aTA = 4000.0 PS I DEFq"H OF CASIi,iG = '70(-)0.0 FEET C'3LLA i:::'5 E 44 30.0 4750.0 o 7 (3(i). 0 60 lO. 0 --- CA LC UL AT t ON S L.,t'~ '"CTI Obi '"'~'~'~'~ ~ LATI VEA[')JUS TED H'fDROSTATI C i'qi.J/~,iB E R ?~EtorlI v'~z t Gilt COLLAPSE PRESbURE P,-¢~. SSU PE 1 261 00.0 ~_o 1 00. () 4430. O0 3'.d3o. 40 342.d6 £. 2 3 (),,)8 0(). 0 3269:)0.0 4,.'.595.7t 352 '7.68 40 O0 . 0() 5ECTIOiq SAFETY FACT[iR :?,AFETY FACTOR SAFETY FAC!JR . . COLLA t' oE BURST I ,42.3'15 I. 148 25. 375 · .~o2 1 . 331 1 . 718 LIU E D ,.'d. () 0 0()024 . 56 C i-.i' U 0 0 (')0.26 [IFF AT 11 :,36C5T 03102/76 TCH 0 O0 4. o 0 ] KC i BELL NIPPLE · .----- FLOW LINE FILL LINE -.----~ ' HYDRIL I 113 5/8-5000PSl wPJ I BLIND RAMS 13 5/8-5000 PSI WP I.  PIPE RAMS 13 5/8-5000 PSI WP ~[| ~ CHOKE LINE TO MANIFOLD KILL LINE ___,,,. DRILLING .----.---W/ADJUSTABLE, POSITIVE AND FROM MUD PUMPS .~ SPOOL HYDRAULIC CHOKE I CSG SPOOL' I1~ 3/8- 5000 P,~.~ / 23 3/8-5000 PSJ~I ~ CSG HD ~ t..____------ 20" CSG 13 5/8" CSG. ~ 5/8" CS¢ BOP STACK ARRANGEMENT AFTER SETTING 9 5/8" CSG AT 7000' CITIES SERVICE COMPANY LEWIS RIVER B-1 SEC. 10, T14N-R9W S.M. UPPER COOK INLET, ALASKA 10,000' DEVELOPMENT WELL BELL NIPPLE~ .... FILL LINE~~. ~ -- I 1 13 5/8- 5000 P~I WP I , I r ~ BLIND RAMS I, ~3 5/s-5ooo ~s, wP ! PIPE RAMS ~3 5/8-5OOO PS~ WP ,,, i KILL LINE ~ DRILLING FROM MUD PUMPS SPOOL CSG HD  "'---- 20" CSG · I J "--- 13 3/8" CSG FLOW LINE CHOKE LINE TO MANIFOLD ------ W/ADJUSTABLE, POSITIVE AND HYDRAULIC CHOKE BOP STACK ARRANGEMENT AFTER SETTING 13 3/8" CSG AT 2400' CITIES SERVICE COMPANY LEWIS RIVER B-1 SEC. UPPER 10, T14N-R9W S.M. COOK INLET, ALASKA 10,000' DEVELOPMENT WELL FLOW LINE HYDRIL 20"- 2000 PSI i I KILL LINE ~_[DRILLING? FROM MUD PUMPS"--'- SPOOL '----- I 6" CHOKE LINE W/FULL OPENING VALVE 8~ CHOKE "'--- AUXILIARY CHOKE LINE 20" CSG BOP STACK ARRANGEMENT WITH 20" CSG SET AT 350' CITIES SERVICE COMPANY LEWIS RIVER B-1 SEC. · UPPER 10, T I'4N-R9W S.M. COOK INLET, ALASKA 10,000' DEVELOPMENT WELL 32 I I 2 I PROPOSED ,~ LEWIS RIVER "B" No. I LAT. = 61° 19 29.59" .... g--6-- ~ -'--7.-~ --- ~ LONG. =150 51 35. 0 X : 348,728 Y =2,677,211 GROUND ELEV.=64' ~a 1 TI5N TI4N CERTIFICATE OF SURVEYOR SCALE: I": I Mile I hereby certify that i am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision, and that all dimensions and other details are correct. PROPOSED LEWIS RIVER "B"' No.I Located in PROTRACTED SEG. IO,TI4N. SEWARD Surveyed for CITIES SERVICE OIL CO. AK, Surveyed by F.M. LINDSEY I~ ASSOC. LAND & HYDROGRAPHIC SURVEYORS P502West Northern Lights Boulevard Box 4-081 Anchorage Alaska CITIES SERVICE OIL COMPANY March 2, 1976 State of Alaska Department of Natural Resources Division of Lands 323 E, 4th Avenue Anchorage, Alaska 99501 CITGO 900 Colorado State Bank Building 1600 Broadway Denver, Colorado 80202 Telephone: 303-892-0263 ~IIqEEAL$ Bi~3~Ci Noted by Br~,~h Chief .......... ,,., Secretary ....... Assigned. ·.. ATTN: Mr. Pedro Denton Chief Minerals Section RE: Cities Service Company Lewis River B #1 Sec. 10-T14N-R9W, S.M. Dear~Sir: Cities Service Company proposes to drill the Lewis River B #1 located in Section 10, T14N, R9W $.M. to a T.D. of 10,000'. Outlined below and submitted for your approval is a sum3~a_~ry of the proposed operations and location of facilities and roads necessary to efficiently drill the proposed well. It is planned to drill the Lewis River B #1 on an all-weather pad and access roads (see location plats). This construction will begin as soon as permission is received from the state, and drilling commenced as soon as construction work is completed. The access road will exit from the permanent road as shown on the attached plat. To assure'prOPer disposal of mud and to prevent pollution, steel mud tanks will be used for the active mud system and mud mixing. After drill operations are completed, the liquid in the earthen pit will be >:~allowed to dry up and the area will be leveled and revegetated as necessary to prevent erosion and to return the area as near as possible to its original state. The Brinkerhoff Camp presently located in Section 11, T14N, R9W, S.M. will b~ utilized in its present location. Garbage, refuse and other pollutants will be burned in an enclosed incinerator with the ashes buried. This camp and sewage handling equipment meets all state and federal environmental requirements. The Superior barge landing will be utilized for landing of equipment and related supplies for drilling the well. This landing is located NW/4 SE/4 of Section 34, T!3N, R9W, S.M. State of Alaska Mr. Pedro Denton March 2, 1976 Page two Fuel and lubricant storage in Section 4~T12N,R10W, S.M. will be diked to prevent flooding and containment in case of storage leak~ facility meets all state and federal environmental standards. This well will have adequate casing to protect fresh water zones and to prevent commingling, contamination of fresh water formations and to prevent escape of any fluid from the well. Blowout preventors and associated equipment will be 'installed to prevent oil spills. All engines will have mufflers to prevent noise pollution. It is proposed to use the existing gravel pit in SectiOn 22,T14N,RgW, S.M. locally known as'the Ivan River pit near Socals Ivan River 44-1 turnoff. If a gravel source is found along the proposed access route, permission will be requested': and the site will be inspected by a representative of your office 'before utilization. The estimated volume of gravel needed for the road i~ 7000 yd3 and 21,000 yd3 for the location (see attached diagrams). It is planned for the roads to revert to the State of Alaska at the end of our use. It is requested that we not be charged for the gravel for the road. Also enclosed is a gravel permit for the first 8,000 yards to be used for the location pad. It is believed that the drilling and completion operations can be accomplished in a safe and environmentally sound manner. Cities Service Company has always operated strictly under the rules and regulations and with full cooperations of all State of Alaska agencies. At the present time it is planned to utilize Brinkerhoff Rig # 58 which is on standby for us at our Lewis River yard. It would be appreciated if you would consider this proposal at your earliest convenience. If any additional infor- mation is needed, please correspond or call Mr. Ran~Hicks or Mr. Reggie Elkins in our Anchorage office. Sincerely, B. B. Edwards Production Manager Western Region BBE:WR~:ba Enclosures: Location Plat (1) Location Map (1) Location and Road Plan Material Application $10.00 check for filing fee 333' 150' -145' die. CELLARI . I~0' I "J RESERVE PIT 5 'Deep 40,000 bbls 320' Burn Pit ~  11 0~t LOCATION LAYOUT sco~e i-d= ~o' LOCATION CROSS-SECTION slope J~18' / "-,,.---'~ '- ~o' ACCESS ROAD CROSS-SECTION siope CITIES SERVICE COMPANY LEWIS RIVER B-1 SEC. 10, T14N-R9W S.M. UPPER COOK INLET, ALASKA 10,000' DEVELOPMENT WELL LEWIS RIVER No PROPOSe9,_,, _~. ~ [~P~ SOCAL LEWIS RIVER t3-2 LEWIS RIVER B I'~..1~ ~ / -~~- ~-k -- PROPOSED ROAD ~" Ho~AL ~0 T ' U Y THEODORE RIVER No. I CHECK LIST FOR NEW ~'~ELL PERHITS Company Yes No Remarks 1. Is the permit fee attached ..................... ~ 2. Is well to be located in a defined pool .............. 3. Is a registered survey plat attached . 4. Is well located proper distance from property line ..... Lease & Well No. ,,A/e:',~/~ '~:~~' -~ ~ '/ 5. Is well located proper distance from other wells ......... ~ 6. Is sufficient undedicated acreage available in this pool . 7. Is well to be deviated ...................... 8. Is operator the only affected party .............. 9. Can permit be approved before ten-day wait ............. ~4~/[ O. Does operator have a bond in force .............. ~,~)F~ 1. Is a conservation order needed ................... 2. Is administrative approval.needed ................. 3. Is conductor string provided ......... · ........... 4. Is enough cement used to circulate on-conductor and surface 5. Will cement tie in surface and intermediate or production strings 6. Will cement cover all known productive horizons ........ 7. Will surface casing protect fresh water zones ........... 8. Will all casing give adequate safety in collapse, tension & burst 9. Does BOPE have sufficient pressure ratinm ". ............ ~dditional Requirements: ~ ~ ~~ Approval Recommended' Geol octv TRM ~ JAL d~ / Engineering' OKG ~,~ HHH Revised 1/15/75