Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout175-070PLUGG!_N~_~ & LOCATION CLEA~CE REPORT
State of Alaska .~~ oz,~ ~ ~ co~s~v~zo~ zomcsszo~
We! ! Name
Review the well file, and' c~e~.e~= on pluq~ing, well head
status, and location clearance - urovide loc. clear, code.
Jell head ~= off: ·
Harker 9os= or plate:
Location Clear,ce: -
Conclusions:
Code
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION Plug.
WELL COMPLETION OR RECOMPLETION REPORT AND LOG MAR
'":~':' "Status of Well C las s i ficat i o n o f ~f~ (~tl~/~h~?..~
r-I Oil [--~ Gas E~ Suspended [~] Abandoned [-] Service .
2. Name of 0'~)erator ..................... 7. Permit Number ............ ~'
BP Exploration (Alaska)Inc. 75-70 398-238
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20184
4. Location of well at surface ~~ 9. Unit or Lease Name
4125' NSL, 502' WEE, SEC. 06, T11N, R14E, UM =~' Prudhoe Bay Unit
At top of productive interval ~ tllllllJl~. '~"~. Well Numb~'
199' NSL, 3195' WEE, SEC. 31, T12N, R14E, UM~ E-04
At total depth 11 Field and Pool
435' NSL, 3418' WEL, SEC. 31 T12N, R14E, UM i '
' , Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 56.52'! ADL 028299
1/5/76 2/1/76 1/19/98 N/A...M.SLI . Zero
'J"~i' Total DePth (MD+TVD) 118. Plug Back D~Pth (MD+TV~')I19. Directionai'Survey 120. Dep{h"'where SSSV set 121. Thickness of Permafrost
10195 9295 FTI 9593 7920 FTI [~ Yes [] NoI N/A MD I 1900' (Approx.)
22. Type Electric or Other Logs Run
DIE / SP / GR, DIE / SP, BHCS / GR, FDC / CNL / GR, CBL / VDL / GR / CCL
~3'. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 94# H-40 Surface 132' 26" 100 sx
13-3/8" 72# N-80 Surface 2840' 18-1/2" 4388 sx Permafrost
* 9-5/8" 47# N-80 Surface 9131' 12-1/4" 1470 sx Howco Lite & Class 'G' ~ 9'5/8'; x 10-3/4"
........
7" 29# N-80 8651' 10195' 8-1/2" 593 sx Class 'G'
.......
24. Perforations (~Pen to ProductiOn (MD+TVD of TOp''and 25.' ............... TUBING RECORD
Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD)
None 5-1/2", 17#, L-80 8398'-8565' 8565'
MD TVD MD TVD 3-1/2", 9.3, L-80 8565` - 9817' 9809'
26. ACID, FRACTURE, cEM'E'NT SQUEEZE' ~'TC.
...... , ....... ,,, .................. , .........
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9593' P&A with 36 Bbls Class 'G', 1500 psi
8378' Set Bridge Plug
8347' Set Top of WhipStock
27. '
PRODUCTION TEST ~'~
Date First"lBr°ducti°n .................iMethod of' Operation (Flowing, gas lift, etc.) U ~'~ I U i N A L
Not on Production
N/A
~;~e of Test Hours Tested PRODUCTION FOR iOIL-BBL GAS-MCF WATER-BeE CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-aBE GAS-MCF WATER-BBL O~L GRAWTY-API (CORR)
Press. 24-HOUR RATE
~8. CoRE DATA
..........................
Brief descriPtion of lithology, porosity, fraCtures, apparent dips and presence oi oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
BKB Subsea
Sag River 9419' 8572'
Shublik 9478' 8621'
Ivishak 9561' 8691'
31. List of Attachments
Summary of Daily Drilling Reports
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble~_~_~~.~ Title TechnicalAssistantlll ...... Date 03' /~'~
E-04 75-70 398-238 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number ........ Perm, i~ No. / Approval No. , ...................
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23.' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Progress Report
Facility PB E Pad
Wall E-04A Page 1
Rig Nabors 7ES Date 10 February 99
Date/Time
20 Oct 98 09:00-09:15
09:15-10:00
10:00-12:30
12:30-17:00
17:00-17:30
17:30-18:00
18:00-18:15
18:15-18:30
18:30-20:00
20:00-21:00
21:00-22:00
22:00-23:30
23:30-03:00
21 Oct 98 03:00-03:30
03:30-06:00
06:00-08:30
08:30-09:00
09:00-11:30
11:30-12:30
12:30-13:30
13:30-16:30
16:30-03:00
22 Oct 98 03:00-05:00
05:00-06:00
06:00-08:00
08:00-11:45
11:45-12:45
12:45-13:00
13:00-14:15
14:15-15:00
15:00-17:30
17:30-22:45
22:45-23:00
23:00-01:00
23 Oct98 01:00-02:00
02:00-02:30
02:30-02:45
02:45-06:00
06:00-06:45
06:45-07:15
07:15-08:00
08:00-11:45
11:45-12:00
12:00-13:00
13:00-15:00
15:00-16:00
16:00-16:30
16:30-20:30
20:30-21:30
21:30-22:30
22:30-00:00
24 Oct 98 00:00-02:00
02:00-04:00
04:00-04:30
Duration
1/4 hr
3/4 hr
2-1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
1/4 hr
1/4 hr
1-1/2 hr
lhr
lhr
1-1/2 hr
3-1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
1/2 hr
2-1/2 hr
lhr
lhr
3hr
10-1/2 hr
2 hr
1 hr
2 hr
3-3/4 hr
lhr
1/4 hr
1-1/4 hr
3/4 hr
2-1/2 hr
5-1/4 hr
1/4 hr
2hr
lhr
1/2 hr
1/4 hr
3-1/4 hr
3/4 hr
1/2 hr
3/4 hr
3-3/4 hr
1/4 hr
lhr
2hr
1 hr
1/2 hr
4hr
1 hr
lhr
1-1/2 hr
2 hr
2hr
1/2 hr
Activity
Held safety meeting
Rigged down Drillfloor / Derrick
Installed Rig services
Rig moved 100.00 %
Rigged down Swab cap
Removed Hanger plug
Held safety meeting
Rigged up Lubricator
Installed Hanger plug
Installed BOP stack
Installed Hanger plug
Rigged down Xmas tree
Rigged up BOP stack
Rigged up High pressure lines
Tested BOP stack
Tested BOP stack (cont...)
Rigged down High pressure lines
Removed Hanger plug
Rigged up Bell nipple
Freeze protect well - 150.000 bbl of Diesel
Made up BHA no. 1
Singled in drill pipe to 9288.0 ft
Circulated at 9288.0 ft
Fished at 9288.0 ft
Fished at 9288.0 ft (cont...)
Pulled out of hole to -0.0 ft
Held safety meeting
Laid down fish
Laid down 824.0 ft of 2-1/16in OD drill pipe
Rigged down Tubing handling equipment
R.I.H. to 8121.0 ft
Laid down 8121.0 ft of 2-7/8in OD drill pipe
Held safety meeting
Laid down 450.0 ft of 2-7/8in OD drill pipe
Rigged down Drillstring handling equipment
Tested Casing head
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations (cont...)
Fished at 35.0 ft
Rigged down Tubing hanger
Circulated at 8414.0 ft
Removed Sub sea tools
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Fished at 8525.0 ft
Held safety meeting
Conducted electric cable operations
Installed Slickline unit
Installed Slickline unit
Conducted slickline operations on Slickline equipment - Tool run
Rigged up Rigging equipment
Rigged up Logging/braided cable equipment
Rigged up Rigging equipment
Progress Report
Facility PB E Pad
Well E-04A Page 2
Rig Nabors 7ES Date 10 February 99
Date/Time
25 Oct 98
26 Oct 98
04:30-05:00
05:00-06:00
06:00-07:00
07:00-08:30
08:30-13:00
13:00-18:00
18:00-18:15
18:15-19:30
19:30-19:45
19:45-21:00
21:00-21:15
21:15-22:00
22:00-22:15
22:15-22:30
22:30-23:00
23:00-23:30
23:30-23:45
23:45-02:30
02:30-03:00
03:00-03:15
03:15-06:00
06:00-06:45
06:45-07:15
07:15-08:30
08:30-09:15
09:15-09:30
09:30-10:00
10:00-10:30
10:30-19:00
19:00-19:30
19:30-22:00
22:00-00:00
00:00-04:00
04:00-04:30
04:30-05:00
05:00-06:00
06:00-09:00
09:00-09:15
09:15-09:30
09:30-09:45
09:45-10:30
10:30-10:45
10:45-12:30
12:30-14:30
14:30-14:45
14:45-15:00
15:00-16:00
16:00-16:15
16:15-16:30
16:30-20:30
20:30-20:45
20:45-21:30
21:30-21:45
21:45-01:00
Duration
1/2 hr
lhr
lhr
1-1/2 hr
4-1/2 hr
5hr
1/4 hr
1-1/4 hr
1/4 hr
1-1/4 hr
1/4 hr
3/4 hr
1/4 hr
1/4 hr
1/2 hr
1/2 hr
1/4 hr
2-3/4 hr
1/2 hr
1/4 hr
2-3/4 hr
3/4 hr
1/2 hr
1-1/4 hr
3/4 hr
1/4 hr
1/2 hr
1/2 hr
8-1/2 hr
1/2 hr
2-1/2 hr
2hr
4hr
1/2 hr
1/2 hr
lhr
3hr
1/4 hr
1/4 hr
1/4 hr
3/4 hr
1/4 hr
1-3/4 hr
2hr
1/4 hr
1/4 hr
lhr
1/4 hr
1/4 hr
4 hr
1/4 hr
3/4 hr
1/4 hr
3-1/4 hr
Activity
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations (cont...)
Conducted electric cable operations
Fished at 33.0 ft
Fished at 33.0 ft
Held safety meeting
Removed BOP stack
Held safety meeting
Removed Hanger plug
Held safety meeting
Rigged up BOP stack
Held safety meeting
Fished at 100.0 ft
Conducted electric cable operations
Tested BOP stack
Held safety meeting
Conducted electric cable operations
Rigged down sub-surface equipment - Other sub-surface equipment
Held safety meeting
Laid down Tubing of 8398.0 ft
Laid down 8398.0 ft of Tubing (cont...)
Rigged down Completion string handling equipment
Installed Emergency hang off assembly
Installed Hanger plug
Tested Blind ram
Retrieved Hanger plug
Retrieved Emergency hang off assembly
Laid down 1125.0 ft of 5in OD drill pipe
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Tested Well control
Held safety meeting
Ran Tubing to 4-1/2in (2054.0 ft OD)
Ran Tubing to 2054.0 ft (4-1/2in OD) (cont...)
Installed Hanger plug
Tested Hanger plug
Held safety meeting
Serviced Pipe ram
Held safety meeting
Removed BOP stack
Installed Xmas tree
Tested Xmas tree
Retrieved Hanger plug
Freeze protect well - 145.000 bbl of Diesel
Installed Hanger plug
Functioned %s
Rigged down Drillfloor / Derrick
Held safety meeting
Skid rig
Held safety meeting
Rig moved 100.00 %
Progress Report
Facility PB E Pad
Well E-04A
Rig Nabors 7ES
Page 3
Date 10 February 99
Date/Time
27 Oct 98
28 Oct 98
29 Oct 98
30 Oct 98
01:00-01:30
01:30-06:00
06:00-06:00
06:00-21:00
21:00-06:00
06:00-07:00
07:00-01:00
01:00-06:00
06:00-00:00
Duration
1/2 hr
4-1/2 hr
24hr
15 hr
9hr
lhr
18 .hr
5 hr
18hr
Activity Skid rig
Rigged down Fluid system
Rigged down Fluid system (cont...)
Rigged down Fluid system (cont...)
Rigged down Drillfloor / Derrick
Rigged down Drillfloor / Derrick (cont...)
Rig moved 100.00 %
Rigged up Rig services
Rigged down Drillfloor/Derrick
Progress Report
Facility PB E Pad
Well E-04A
Rig Nabors 7ES
Page 1
Date 10 February 99
Date/Time
14 Dec 98 00:00-06:00
06:00-06:00
15 Dec 98 06:00-12:00
12:00-12:30
12:30-00:00
16 Dec 98 00:00-00:30
00:30-06:00
06:00-10:00
10:00-10:30
10:30-14:30
14:30-18:30
18:30-19:30
19:30-22:00
22:00-00:00
17 Dec 98 00:00-05:00
05:00-06:00
06:00-08:30
08:30-09:30
09:30-11:00
11:00-12:00
12:00-12:15
12:15-13:30
13:30-14:00
14:00-17:00
17:00-18:00
18:00-18:30
18:30-00:00
18 Dec 98 00:00-06:00
06:00-09:00
09:00-09:30
09:30-12:00
12:00-12:30
12:30-13:30
13:30-14:00
14:00-20:30
20:30-21:00
21:00-23:30
23:30-03:00
19 Dec 98 03:00-05:30
05:30-06:00
06:00-08:00
08:00-08:30
08:30-10:00
10:00-10:30
10:30-11:00
11:00-11:30
11:30-14:00
14:00-18:30
18:30-20:00
20:00-06:00
20 Dec 98 06:00-07:30
07:30-08:00
08:00-10:30
10:30-11:00
Duration
6hr
24hr
6hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
4hr
1/2 hr
4hr
4hr
lhr
2-1/2 hr
2hr
5hr
lhr
2-1/2 hr
lhr
1-1/2 hr
lhr
1/4 hr
1-1/4 hr
1/2 hr
3hr
lhr
1/2 hr
5-1/2 hr
6 hr
3hr
1/2 hr
2-1/2 hr
1/2 hr
lhr
1/2 hr
6-1/2 hr
1/2 hr
2-1/2 hr
3-1/2 hr
2-1/2 hr
1/2 hr
2hr
1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
4-1/2 hr
1-1/2 hr
10hr
1-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
Activity
Rig moved 10.00 %
Rig moved 75.00 % (cont...)
Rig moved 75.00 % (cont...)
Held safety meeting
Rig moved 90.00 %
Held safety meeting
Rig moved 99.00 %
Rig moved 100.00 % (cont...)
Held safety meeting
Rigged down Xmas tree
Rigged up BOP stack
Tested Slip & seal assembly
Installed Hanger plug
Rigged up Service lines
Tested BOP stack
Rigged up Tubing handling equipment
Repaired Top drive pipe handler
Retrieved Tubing hanger
Reverse circulated at 2017.0 ft
Laid down 766.5 ft of Tubing
Held safety meeting
Laid down 1250.0 ft of Tubing
Rigged down Tubing handling equipment
Tested Bottom ram
Made up BHA no. 2
Repaired Well control
Made up BHA no. 2
R.I.H. to 5297.0 ft
R.I.H. to 8315.0 ft (cont...)
Held safety meeting
Circulated at 8315.0 ft
Held drill (Abandonment)
Circulated at 8315.0 ft
R.I.H. to 8377.0 ft
Milled Casing at 8378.0 ft
Reamed to 8378.0 ft
Circulated at 8347.0 ft
Pulled out of hole to 1006.0 ft
Pulled BHA
Cleared Flowline
Made up BHA no. 3
Functioned M.W.D. tool
Made up BHA no. 3
Held safety meeting
Serviced Top drive
Made up BHA no. 3
Singled in drill pipe to 2770.0 ft
R.I.H. to 8365.0 ft
Repaired Top drive
Drilled to 8600.0 ft
Drilled to 8621.0 ft (cont...)
Pulled out of hole to 8282.0 ft
Repaired Top drive
R.I.H. to 8563.0 ft
1Z/1U/98 14:49 FA~ 9U7 8§4 ~ tH~ I~Ai~LUi(ATiUi~ ~U~~ ~VVl
~ ~--o~o
--
I I Il d 'f- I '" -- ~ I ~ I~'
TREE: 6" CIW'E-_04__
WELLHEAD: MoEVOY KB. ELEV = ,56.52'
-- m - - BF. ELEV = 28.60'
ACTUATOR: OTIS
DIESEL TO 2,054' --'. ] 50 JTS. 4.5" L-80 MBT. TBG.
~ TO 2,054'
I
13-3/8", 72#/ff, ~
N-80, BTRS.I ~O~V J
i
SEAWATER TO 8,378' -
r
KOP: 3000'
I MAX ANGLE: 35° @ 5700'
j~~-~~ ' BRIDGE PLUG SET ~ 8,378'
"--'----- TBG. CUT @ 8,398'
~ 5 1/2" SLIDING SLEEVE[8484'
OTIS "XA" (4.562" ID)
(2.992"
TOP OF m
LI
NER i ~ ~ ~ Straddle Perfs Squeezed
Fish consists of 270' 1.75" CT, CTC, DCV,~s~l~~l~a~'ii~l~ ' ~
9691
Disc, Circ Sub, Tandem mtr, 2.65" mill ~J~~
---~.
BLAST
JOINTS
:TOP
w/ball0ndiscsea,. See .HA #P- ,of telex ~~ :BTM t _ClR10'
Feb 1, 1998. Top of fish @ 9300 / 'JJJ~~ BAKER K 22 ANCHOR ~ 9810'
CaCo3 fill from
9817' to 9760' J ~ B 7" BAKER (SAB) i 9811'
PERFORATION SUMMARY I la~a~l~ 31/2 X NIPPLE , j '__ , I
..~I' ,ii, k.~~ (OTto) (ZT~O lo) , 9816
4" 4 9687 - 9712' SQZD 1/19/98 J
4" 497:27'9742 ..... J I9798'.
4" 4 975~ - 9795 .... I I
ABO~IE PEF FS BEHIND STRAD[ LE
" / J JJ~J~J~JlJ~J~ Cement 9980 - 10000
4" 4 9810' - 9823' SQ,,ZD 4/2y96... jm=~=m~,l
2 1/8" 4 9890 9920' OI 'EN
' ~1 ~ Cement 10100- 10120
P~TD ! 10,141' J -"
7-. ~,"~. L-,O. ,T~S ~
iii i i iii ii i ii i iiiii
DATE ::lEV. BY COMMENTS
' PRUDHOE BAY UNIT
4-12-76 INITIAL COMPLETION
,,, , ,,,
12-20-84 RWO WELL: E-04 ~24-31-12-1
4,/~6m~ ..... T~va Post Sqzperfs , APl NO: S0-O29-20184
1pD/.qR .ITp .cfr;rtrll~. Rn,,~..;~_ .... SEC 6; TN 1,,,1 N; RG.E 13E
2/09/98 DDW ~,dd CT Fish
11/3/98 ,J JONES DC YON14 PULLED TBG. SETB. PLUG IBP Exploration (Alaska)
I
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION Plugback for Sidetrack
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
r--I Oil [] Gas [--] Suspended [~ Abandoned [] Service
!2. Name of OperatOr ........................ ~'.""perrnit Number
BP Exploration (Alaska) Inc. 75-70 398-238
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20184
4. Location of well at surface · 9. Unit or Lease Name
Prudhoe Bay Unit
4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM .
At top of productive interval I, ,,_~_ ~ 10. Well Number
199' NSL, 3195' WEL, SEC. 31, T12N, R14E, UM~ E-04
At total depth 11. Field and Pool
435' NSL, 3418' WEL, SEC. 31, T12N, R14E, UM ' ~ Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE = 56.52' ....I ADL 028299
12. Date Spudded1/5/76 113' Date T'D' Reached i i 4' Dat~'"~°mP" Susp" °r Aband'115' water depth' if °fish'°re 116' I~'b' °f C°mplefi°ns2/1/76 1/19/98 N/A MSLI Zero
17. Tote~'i'"Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)I19. Directional survey 120. Depth where SSSV set121. Thickness of Permafrost
10195 9295 FTI 9593 7920 FTI [] Yes [] NoI N/A MDI 1900' (Approx.)
22. TyPe Electric or Other Logs Run
DIL/SP/GR, DIL/SP, BHCS/GR,. FDC/CNL/GR, CBL/VDL/GR/CCL
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 94# H-40 Surface 132' 26" 100 sx
13-3/8" 72# N-80 Surface 2840' 18-1/2" 4388 sx Permafrost D r' ~'- [~ ~ ~j~ I
· 9-5/8" 47# N-80 Surface 9131' 12-1/4" 1470 sx Howco Lite & Class 'G' * 9-5/8" ~1~;}/.4'L- I ¥ I
7" 29# N-80 8651' ' 10'i95, 8_1/2,, 593 sxClass 'G' ~
,, ',' ..... Po !99
...................................
24. Perfor~tii)ns open to Production (MD+TVD of"Top"'~d 25. TUBING RECORD ,~}agt(a alii & Gas Cons. Co
Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER ~ge
None 5-1/2", 17#, L'80 8398'-8565' 8565'
MD TVD MD TVD ,, ' ........
3-1/2,9.3, L-80 8565' - 9817' 9809'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
............
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9593' P&A with 36 Bbls Class 'G', 1500 psi
9378' Set Bridge Plug
34' - 2054' 4-1/2", 12.6#, L-80 Kill String Tubing
Freeze Protect with 145 Bbls of Diesel
....
27. PRODUCTION TEST ir~ r'~ ! ~ ! ~, .! ~- i
"~)ate'First Production .... i Ueih°d of Operation (Flowing, gas lift, etc.) 'U K I b A L
Not on Production ] N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF !WATER-BBL CHOKE SiZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing PressUre '0ALCULATED OIL-BBL GAS-McF WATER-BBL OIL GRAVITY-APl (CORE)
Press. i24-HOUR RATE
28. CORE DATA
Brief description of lith01ogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
D
remiss
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
BKB Subsea
Sag River 9419' 8572'
Shublik 9478' 8621'
Ivishak 9561' 8691'
RECEIVED
31. List of Attachments Alaska 0il & Gas Cons. Comli3jssi01
Summary of Daily Drilling Reports Anchorage
'~2'. I hereby rtify that the fo oin ' true anti correct'to the best of my k'n~wle'dge ............
Signed ~t~
,, Title Senior Drilling Engineer Date ........
E-04 75-70 398-238 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Numb, e,r, .... Permit No. / Approval N.,.o,,; ..........................................
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
E-04
DESCRIPTION OF WORK COMPLETED
CT RWO OPERATIONS
01/19/98 A Packer Squeeze was performed using the following fluids:
SUMMARY
Rig up HB&R to pump down IA. Initial pressure was 1150 psig. IA pressured up
after 37 bbls away and would only take 1.6 BPM at 3000 psig. RU CTU with
2.25" cementing nozzle and stingers. Tried to BH tubing but well began to
pressure up. POP'ed well to LDF with chokes cracked and HB&R circulating
water down IA at max rate, RIH circulating gas out to flowline. Tagged scale at
9755' CTMD and did not correct depth. Cooled sump with 230 bbls of FSW. IA
was fluid packed with 625 bbls of FSW and 120 bbls of diesel. Injectivity was 2
BPM at 1150 psig and 1 BPM at 790 psig, Mixed and pumped 36 bbls of
cement. Laid in cement from 9745' - 9400'. Established approximately 1500
psig of squeeze differential at the perfs with 16 bbls of cement out the nozzle.
Pumped the remaining 20 bbls into the IA taking returns down the flowline and
holding WHP constant at 500 psig. Jetted tubing from 9400' to surface while
holding 500 psig on well. FP tubing and FL with methanol. Coil froze off in the
lubricator at 97', RU HB&R and circulated heated diesel through coil. Coil came
free, Left well SI with 500 psig on tubing and IA. Estimated TOC 9400' CTMD
(assumes no U-tubing).Estimate approximately 4 bbls of cement behind pipe.
Estimated TO(; in IA at 9165',360'-400' of cement remaining in tubing,
Fluids Pumped
BBLS. Description
935 Fresh Sea Water
247 Slick Sea Water
20 Fresh Water
64 Methanol
36 Cement
1302 Total
E-04
DESCRIPTION OF WORK COMPLETED
CT RWO OPERATIONS
01/27/98
A Mill Cement, Cut Coil was performed using the following fluids:
SUMMARY
01/27/98:
Moved in rig up DS CTU #6. Rig up Trico. MU dual tandem 2.375" motor
assembly w/2.650" mill. PT tools & lubricator. Come online w/pumps @ 0.5
bpm to displace meoh. RIH. Tag at 9390', fell through. Drill from 9463' to
9530'. Circ, got stuck 9519'. Pump gel sweep, clean hole and POH. Shut down
for night.
01/28/98:
Pick up motor and mill (same assembly as yesterday). Rig in hole. Drill from
9375' to 9593', sweeping hole with rio-pro. While working through GLM at
9590', stuck coil. Couldn't pump down coil or pull free at maximum allowable
coil tension. Pump down backside and surge well. No success. Pump
Methanol intermittently down coil to protect as much as possible. Developed an
ice plug in the coil. Load IA and tubing w/water. Attempt to surge well. No
success. Tarp coil and injector, RU air heaters to thaw ice plug in coil. Circulate
gas all night down IA and up production tubing to keep coil warm through
permafrost.
01/29/98:
RU HB&R. Pump 550 bbls warm KCL water around IA and backside to fluid
pack system. Prepare to cut coil and saw pressure bleed off at 11th hour. Pump
7 bbls Methanol into coil by pressuring up to 4000 psi and bleeding off. Removed
ice plug. Launch 3,~,, disconnect ball and proceed to displace Methanol to goose
neck. Continue through the night to surge ball through coil for disconnect.
01/30/98:
Continue surging ball through coil. Finally get ball over goose neck. Let ball fall.
Ball on disconnect seat. Pressure several times up to 5500 psi at various string
weight without success. Could not disconnect. Ball either not on seat, or not
making positive seal. Still have pressure bleed off through the coil. After many
attempts, bleed off coil and wellhead pressure and cut coil above BOP's. Install
TIW valve on the coil stub. Set down injector head. Pick up lubricator and
pressure cap. Secure well. Shut down for night.
E -04
DESCRIPTION OF WORK COMPLETED
Ct RWO OPERATIONS
01/31/98:
Moved in rig up SWS Completion Unit for coil chemical cut. Cut coiled tubing at
9300'. Chemical cutter stuck in coil. Work cutter and e-line. Can't pull free at
maximum line tension. Pump down coil w/mech. Finally pull out of rope socket.
Left cutter in hole. Bleed down well (fluid u-tubing) RD e-line. Cold roll on
injector end, install TIW valve, lubricator and pressure cap. Secure well, shut
down for night.
02/01/98:
LD lubricator & TIW valve. Cold roll pipe together, walk injector down and
connect to BOP's. Open pipe and slip rams. Pick up, pipe is free. Spool pipe
on reel. Begin cutting pipe to check for cutter. Found chemical cutter in the
bottom 20' of the coil. Lay down cutter, Rig up on well and freeze protect
flowline with 38 bbls Methanol. Blow coil dry with Nitrogen. Bleed down coil.
Secure well. Rig down CTU #6 and send to yard to spool pipe. Job suspended
until CTU #2 available to fish BHA.. Left BHA #2 in hole and 270' of 1.75" coil
looking up. Top of fish is 9300'.
Fluids Pumped
BBLS. Description
2267 2% KCL w/friction reducer
227 Methanol
45 FIo-Pro
425 Diesel
2964 Total
Facility
PB E Pad
Progress Report
Well E-04A Page 1
Rig (i-'---------------~ l)O~OV~ I t~ Date 02 December 98
Date/Time
20 Oct 98
21 Oct 98
22 Oct 98
23 Oct 98
24 Oct 98
09:00-09:15
09:15-10:00
10:00-12:30
12:30-17:00
17:00-17:30
17:30-18:00
18:00-18:15
18:15-18:30
18:30-20:00
20:00-21:00
21:00-22:00
22:00-23:30
23:30-03:00
03:00-03:30
03:30-06:00
06:00-08:30
08:30-09:00
09:00-11:30
11:30-12:30
12:30-13:30
13:30-16:30
16:30-03:00
03:00-05:00
05:00-06:00
06:00-08:00
08:00-11:45
11:45-12:45
12:45-13:00
13:00-14:15
14:15-15:00
15:00-17:30
17:30-22:45
22:45-23:00
23:00-01:00
01:00-02:00
02:00-02:30
02:30-02:45
02:45-06:00
06:00-06:45
06:45-07:15
07:15-08:00
08:00-11:45
11:45-12:00
12:00-13:00
13:00-15:00
15:00-16:00
16:00-16:30
16:30-20:30
20:30-21:30
21:30-22:30
22:30-00:00
00:00-02:00
02:00-04:00
04:00-04:30
Duration
1/4 hr
3/4 hr
2-1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
1/4 hr
1/4 hr
1-1/2 hr
1 hr
1 hr
1-1/2 hr
3-1/2 hr
1/2 hr
2-1/2 hr
2-1/2 hr
1/2 hr
2-1/2 hr
1 hr
1 hr
3 hr
10-1/2 hr
2 hr
1 hr
2 hr
3-3/4 hr
1 hr
1/4 hr
1-1/4 hr
3/4 hr
2-1/2 hr
5-1/4 hr
1/4 hr
2 hr
1 hr
1/2 hr
1/4 hr
3-1/4 hr
3/4 hr
1/2 hr
3/4 hr
3-3/4 hr
1/4 hr
1 hr
2 hr
1 hr
1/2 hr
4 hr
1 hr
1 hr
1-1/2 hr
2 hr
2 hr
1/2 hr
Activity
Held safety meeting
Rigged down Drillfloor / Derrick
Installed Rig services
Rig moved 100.00 %
Rigged down Swab cap
Removed Hanger plug
Held safety meeting
Rigged up Lubric, ator
Installed Hanger plug
Installed BOP stack
Installed Hanger plug
Rigged down Xmas tree
Rigged up BOP stack
Rigged up High pressure lines
Tested BOP stack
Tested BOP stack (cont...)
Rigged down High pressure lines
Removed Hanger plug
Rigged up Bell nipple
Freeze protect well - 150,000 bbl of Diesel
Made up BHA no. 1
Singled in drill pipe to 9288.0 ft
Circulated at 9288.0 ft
Fished at 9288,0 ft
Fished at 9288.0 ft (cont...)
Pulled out of hole to 0.0 ft
Held safety meeting
Laid down fish
Laid down 824.0 ft of 2-1/16in OD drill pipe
Rigged down Tubing handling equipment
R.I.H. to 8121.0 ft
Laid down 8121.0 ft of 2-7/8in OD drill pipe
Held safety meeting
Laid down 450.0 ft of 2-7/8in OD drill pipe
Rigged down Drillstring handling equipment
Tested Casing head
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations (cont...)
Fished at 35.0 ft
Rigged down Tubing hanger
Circulated at 8414.0 ft
Removed Sub sea tools
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Fished at 8525.0 ft
Held safety meeting
Conducted electric cable operations
Installed Slickline unit
Installed Slickline unit
Conducted slickline operations on Slickline equipment - Tool run
Rigged up Rigging equipment
Rigged up Logging/braided cable equipment
Rigged up Rigging equipment
Facility
PB E Pad
Progress Report
Well E-04A Page 2
Rig (null) Date 02 December 98
Date/Time
25 Oct 98
26 Oct 98
Duration
04:30-05:00 1/2 hr
05:00-06:00 1 hr
06:00-07:00 I hr
07:00-08:30 I-1/2 hr
08:30-13:00 4-1/2 hr
13:00-18:00 5 hr
18:00-18:15 1/4 hr
18:15-19:30 1-1/4 hr
19:30-19:45 1/4 hr
19:45-21:00 1-1/4 hr
21:00-21:15 1/4 hr
21:15-22:00 3/4 hr
22:00-22:15 1/4 hr
22:15-22:30 1/4 hr
22:30-23:00 1/2 hr
23:00-23:30 1/2 hr
23:30-23:45 1/4 hr
23:45-02:30 2-3/4 hr
02:30-03:00 1/2 hr
03:00-03:15 1/4 hr
03:15-06:00 2-3/4 hr
06:00-06:45 3/4 hr
06:45-07:15 1/2 hr
07:15-08:30 1-1/4 hr
08:30-09:15 3/4 hr
09:15-09:30 1/4 hr
09:30-10:00 1/2 hr
10:00-10:30 1/2 hr
10:30-19:00 8-1/2 hr
19:00-19:30 1/2 hr
19:30-22:00 2-1/2 hr
22:00-00:00 2 hr
00:00-04:00 4 hr
04:00-04:30 1/2 hr
04:30-05:00 1/2 hr
05:00-06:00 1 hr
06:00-09:00 3 hr
09:00-09:15 1/4 hr
09:15-09:30 1/4 hr
09:30-09:45 1/4 hr
09:45-10:30 3/4 hr
10:30-10:45 1/4 hr
10:45-12:30 1-3/4 hr
12:30-14:30 2 hr
14:30-14:45 1/4 hr
14:45-15:00 1/4 hr
15:00-16:00 1 hr
16:00~16:15 1/4 hr
16:15-16:30 1/4 hr
16:30-20:30 4 hr
20:30-20:45 1/4 hr
20:45-21:30 3/4 hr
21:30-21:45 1/4 hr
21:45-01:00 3- !/4 hr
Activity
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations (cont...)
Conducted electric cable operations
Fished at 33.0 ft
Fished at'33.0 ft
Held safety meeting
Removed BOP stack
Held safety meetihg
Removed Hanger plug
Held safety meeting
Rigged up BOP stack
Held safety meeting
Fished at 100.0 ft
Conducted electric cable operations
Tested BOP stack
Held safety meeting
Conducted electric cable operations
Rigged down sub-surface equipment - Other sub-surface equipment
Held safety meeting
Laid down Tubing of 8398.0 ft
Laid down 8398.0 ft of Tubing (cont...)
Rigged down Completion string handling equipment
Installed Emergency hang off assembly
Installed Hanger plug
Tested Blind ram
Retrieved Hanger plug
Retrieved Emergency hang off assembly
Laid down 1125.0 ft of 5in OD drill pipe
Held safety meeting
Conducted electric cable operations
Conducted electric cable operations
Conducted electric cable operations
Tested Well control
Held safety meeting
Ran Tubing to 4-1/2in (2054.0 ft OD)
Ran Tubing to 2054.0 ft (4-1/2in OD) (cont...)
InstalIed Hanger plug
Tested Hanger plug
Held safety meeting
Serviced Pipe ram
Held safety meeting
Removed BOP stack
Installed Xmas tree
Tested Xmas tree
Retrieved Hanger plug
Freeze protect well - 145.000 bbl of Diesel
Installed Hanger plug
Functioned %s
Rigged down Drillfloor / Derrick
Held safety meeting
Skid rig
Held safety meeting
Rig moved 100.00 %
~ STATE OF ALASKA --'-",
ALAsK/-, ,J~L AND GAS CONSERVATION CL,..,MlSSlON
APPLICATION FOR SUNDRY APPROVAL
Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
199' NSL, 3195' WEL, SEC. 31, T12N, R14E, UM
At effective depth
5. Type of well:
[] Development
r--] Exploratory
[] Stratigraphic
[--I Service
6. Datum Elevation (DF or KB)
KBE = 56.52'
At total depth
435' NSL, 3418' WEL, SEC. 31, T12N, R14E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
E-04
9. Permit Number
75-70 / 398-238
10.
j11.
10195 feet Plugs (measured)
9295 feet
9593 feet Junk (measured)
7920 feet
APl Number
Ziaska Oil & Gas Cons. Commission
Anchorage
Cement Plug at 9593' (10/98)
270' Coil TubinQ Eauip. Fish, ToD at 9300' (02/98)
Casing
Length
Structural
Conductor 104'
Surface 2812'
Intermediate 9103'
Production
Liner 1514'
Size Cemented
20"
13-3/8" 4388 sx Permafrost
10-3/4" x 9-5/8" 1470 sx Howco Lite & Class 'G'
7" 593 sx Class 'G'
MD TVD
132' 132'
2840' 2840'
9131' 8388'
8651'-10195' 7981'-9295'
Perforation depth: measured Cemented: 9890' - 9920'; Straddle Packed (& Sqzd): 9687' - 9712', 9727' - 9742',
9755' - 9795', Non-straddle packed (& Sqzd): 9810' - 9823', 9843' -
true vertical subsea 8799'-9003' (five intervals) ORIGINAL
Tubing (size, grade, and measured depth) 5-1/2", L-80 to 8565' with 3-1/2" tailpipe to 9817'
Packers and SSSV (type and measured depth) 9-5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9809'; 5-1/2" SSSV
at 2125'
13. Attachments [] Description summary of proposal
t , ,
14. Estimated date for commencing operation
October 22, 1998
16. If proposal was verbally approved
Name of approver ........... Date approved
contact Engineer Name/Number: Bob Kaluza, 564-5344
[] Detailed operations program [] BOP sketch
15. Status of well classifications as:
[] Oil [--] Gas r-] Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby ce~ify that the fo~jgoing is true and correct to the best of my knowledge
Signed
Da ........ /~ Title Engineering Supervisor
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Plug integrity__ BOP Test ~ Location clearance
Mechanical Integrity Test__ Subsequent form required
Approved by order of the Commission ..,,'iglrlaJ Signed By ~ ~ .~t~.~,7~,. Z3 .,~3ommissioner
Form 10-403 Rev. 06/15/88 ;3avid W. Johnston
Approval Nc~Oj~-b3.~
Date
Submit In Triplicate
BP EXPLORATION
To: Blair Wondzell AOGCC
From: Bob Kaluza MB 8-1
Operations Shutdown (E-04)
Subject:
Re: Sundry Permit # 398-238, APl Number 50-029-20184
Date: October 22,1998
The rig Workover objective on Doyen 14 was to pick up a 1%" overshot, latch over a CT
(coiled tubing) fish at 9,300' and attempt to pull the fish free. If the fish did pull free then the rig
would PU a small milling assembly, mill out _+ 170' of cement, clean out wellbore to _+ 9,980',
displace the well to inhibited seawater and release the well to production. There would be no
need to Sidetrack the well.
If the CT fish was not recovered, the original wellbore would then be considered abandoned
below the cemented 3 ~" production tubing (cement plug set and tested from 9,760' to 9,593')
and 9 5/8" x 5 ½" production packer set at 8,565'. The production tubing above the open
perforations (at 9,890' - 9,920') is cement plugged and the plug tested to 3000 psi. The Sundry
Permit was for approval of the abandoned condition of the wellbore should the workover
objective not be achieved.
The CT fish did not pull free.
Doyen rig 14 is doing the well work but will be released from its contract with SSD on
November 1, 1998. There is not enough time to complete the sidetrack drilling before the
release date, therefore the well will need to be left as 'Operatons Shutdown' for a planned
period of less than 60 days.
Before the rig leaves the well the 5 ~" tubing, presently in the well will be chemically cut at
8,520' and the wellbore circulated to 8.4 ppg clean seawater. 200' of the tubing will be laid
down, a storm packer will be set and the 9 5/8" packoff will be changed out.*-The remaining
tubing will be pulled, a retrievable bridge plug will be set at 8,370', the 9 5/8" casing tested to
3,000~ the tree nippled up on the well.
Prepared bRY(~ be r~,~K~a I ~zT,~(~ ~~'
Dan ~tone, Drilling Engr. Supv.
y'o,~ ~,~v ~,,~,~"
If you have any questions, contact Bob Kaluza, ODE, SSD 564 5344, pager 275 1014.
CC:
Tony Bunch MB 8-1
Dan Stone MB 8-1
Tim Burns MB 8-1
Jim Smith MB 8-1
Rig Supervisor Doyen 14
DS E-04A Well File W2-2
Floyd Hernandez MB 10-3
?~,. STATE OF ALASKA
ALASKJ-~ ,J~L AND GAS CONSERVATION CC...,.vIISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
4125' NSL, 502' WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
199' NSL, 3195' WEL, SEC. 31, T12N, R14E, UM
Type of well:
[~ Development
[--I Exploratory
[] Stratigraphic
I--1Service
6. Datum Elevation (DF or KB)
KBE = 56.52'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
E-04
9. Permit Number
75 -70
10. APl Number
At effective depth
414' NSL, 3395' WEL, SEC. 31, T12N, R14E, UM
At total depth
435' NSL, 3418' WEL, SEC. 31, T12N, R14E, UM
12. Present well condition summary
Total depth: measUred
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
10195 feet
9295 feet
10141 feet
9249 feet
Wr D!
~_~i..C~i.. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
I
Plugs (measured) - -
Junk(measuro~g$~['$?[~ [~GO~l I ubing270'~5~h~_?,,{~.~O Equip Fish, Top at 9300' (02/08)
Length Size Cemented M D TVD
104' 20" 132' 132'
2812' 13-3/8" 4388 sx Permafrost 2840' 2840'
9103' 10-3/4" x 9-5/8" 1470 sx Howco Lite & Class 'G' 9131' 8388'
1514' 7" 593 sx Class 'G' 8651' - 10195' 7981' - 9295'
Perforation depth: measured Open: 9890' - 9920'; Straddle Packed (& Sqzd): 9687' - 9712', 9727' - 9742', 9755' - 9795'
Non-straddle packed (& Sqzd): 9810' - 9823', 9843' - 9924'
true vertical subsea 8799' - 9003' (five intervals)
Tubing (size, grade, and measured depth)5-1/2", L-80 to 8565' with 3-1/2" tailpipe to 9817' O~lGINAL
Packers and SSSV (type and measured dePth) 9-5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9809'; 5-1/2" SSSV
at 2125'
13. Attachments ~;~ Description summary of proposal I--I Detailed operations program i--I BOP sketch
14. Estimated date for commencing operation
September 16, 1998
16. If proposal was verbally approved
Name of approver
contact Engineer Name/Number: Bob Kaluza, 564-5344
Date app..rqved
15. Status of well classifications as:
[] Oil I--1 Gas I--] Suspended
Service
Prepared By Name/Numbec Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Dan Stone ~ '~-"~"~-~X~ Title Engineering Supervisor Date
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness i ~pp?val N0...~
Plug integrity ~ BOP Test ~ Location clearance
Mechanical Integrity Test Subsequent form 'red 10-
Commissioner Date
Approved by order of the Commission
Form 10-403 Rev. 06/15/88
re(],~
Original S~gned By ~o~.o~,~~,~.,-.?.~,-~. ... ~ ..
'""-'"hntn ' rd ~, ~'7'
Liavld W J0 S0
· /~ ,,- ~ ~..- Submit In Triplicate
BP EXPLORATION
To:
From:
Subject:
Blair Wondzell AOGCC
Bob Kaluza MB 8-1
Sundry Permit for Well Abandonment (E-04)
Date: September 4,1998
Doyon Rig 14 will move to E-04 on/about Sept. 16, 1998 following the completion of seven (7)
days of rig maintenance. A Sundry Permit for abandonment will be required for this well if the
Workover objective is not achieved. The well, in its current condition, meets abandonment
status but has not been permitted as abandoned.
The rig Workover obiective is to pick up a 1 ~A" overshot, latch over a CT (coiled tubing) fish at
at 9,300' and attempt to pull the fish free. If the fish does pull free then the rig will PU a small
milling assembly, mill out _+ 170' of cement, clean out wellbore to _+ 9,980', displace the well to
inhibited seawater and release the well to production. There will be no need to Sidetrack drill
this well.
If the CT fish can not be recovered, the original wellbore will then be considered abandoned
below the cemented 3 ½" production tubing (cement plug set and tested from 9,760' to 9,593')
and 9 5/8" x 5 1~,, production packer set @ 8,565'. The production tubing above the open
perforations (at 9,890' - 9,920') is cement plugged and the plug tested to 3000 psi. The Sundry
Permit is for approval of the abandoned condition of the wellbore should the workover
objective not be achieved.
The drillinq obiective will be to cut and pull 8,360' of existing 5 1,~"tubing, set a Whipstock on
the cut stub, mill through 9 5/8" csg, directionally drill an 8 1~,, hole and set a 7" liner 10' into
the Sag River. Directionally drill out of the 7" shoe to horizontal, then steer through (2) Z2
targets to TD at 12,737'. Run, cement and test a 4 1~,, liner, perforate the productive zones,
then complete the well with 4 1~,, tubing plus (6) GLM's.
Objective:
The objective of the pre-rig work is to test the 9 5/8" pack off and tubing hanger, set a BPV in preparation of
the rig move.
Pre-Rig Operations:
1. Pressure test the 9 5/8" packoff to 5,000 psi. If the 9 5/8" packoff tests, back out completely and check
each LDS (check one at a time). If the packoff does not test, carefully cycle each LDS (one at a time).
2. Pressure test the tubing hanger packoff to 5,000 psi. (notify ODE of test results and diagnostics).
3. Pressure test the 5 1~,, tubing and the 5 1,~,, x 9 5/8" annulus to 3,000 psi. (report results).
4. Set a BPV in preparation of the rig sidetrack.
Rig Workover Procedure
]. MIRU. ND tree, NU and test BOPE.
2. MU 2 1/16" Drill String wi 1 3A,, overshot, Circ. wellbore to 8.7 ppg brine,
RIH latch onto CT fish @ 9,300'.
3. POOH w/2.65" mill/1 ~A" CT fish.
4. MU Cement milling BHA, mill cement to from 9,593' to 9,760', tag 'X' nipple plug @ 9,816'.
.5. RU slickline POOH with 'X' plug
6. RIH with 2.65 milling assembly to 9,980'. Circ, well clean. LD small drill string.
'7. Set BPV, ND BOPE, NU Tree. Move rig off well.
Note: If the CT fish pulls free, cement squeeze plug milled up and 'X' nipple plug retrieved, then there will be
no need to Sidetrack E-04.
Rig Sidetrack Procedure (if CT fish does not pull free)
]. POOH & LD small drill string
2. RU e-line, RIH wi double anchor chemical cutter, cut 5 ~" tubing @ 8,365'.
3. Pull the 5 1~,, tubing completion. Tubing cut at + 8,365' MD.
4. Replace the leaking 9 5/8" packoff if necessary.
5. Set 9 5/8"whipstock on top of 5 ~" tubing stub and mill window.
6. Kick-off and directionally drill 8 ~/~" hole to 10' into TSAG + 9,670' MD.
?. Run, cement and test 7" liner.
8. Directionally drill 6" hole to horizontal + 10,500' MD.
9. Run DPC log suite when reaching horizontal.
]0. Directionally drill the Zone 2 horizontal section to TD + 12,737' MD.
11. Run and cement 4 1~,,, L-80 solid production liner.
]2. Perforate DPC
]3. Run 4 ~", L-80 tubing completion.
]4. ND BOPE, NU and~st tree. RDMO.
Prepared by: ~- ~'~~~~-"'""'~
Rober[ Kaluza, OISeraiti(ms Drilling Engineer
Endorsed by ~----------~--- ,',~, ~
Dan Stone, Drilling Engr. Supv.
If you have any questions, contact Bob Kaluza, ODE, SSD 564 5344, pager 275 1014.
CC:
Tony Bunch MB 8-1
Dan Stone MB 8-1
Tim Burns MB 8-1
Jim Smith MB 8-1
Companymen Doyon 14
DS E-04A Well File W2-2
Floyd Hernandez MB 10-3
TREE: 6'CIW ~"~' E 04
WELLHEAD: McEVOY / mm J 28.60'
ACTUATOR: OTIS
~ 5 1/2"SSSV LANDING NIPPLE
O (OTIS)(4.562' ID) 2125'
~>R411' -- ~ ..... ~o w..~,~.,
8 3975' 3910'
7 5~5' 5298'
5 1/2"
6 7140' ~02'
KOP: 3~' ~ j 5 8268' 7660'
M~ ANGLE: 35~ ~ 5700' ~ ~ 4 ~15' ~25'
' 1
I
i McM IRRAY "FMHO" w/1" )K ~TCH
3 9~9' 8550'
5 1/2", 17~, L-80, IJ4S 2 9~9' ~34'
TUBING I 95~' 8719'
3 1/2"
~ ~BING ID: 4.892"
I
CAPACI~: .0232 BB~ i
3 1/2" 9.3~, L-80, AB MOD ~ L 9-5~8' BAKER PACKER
(2.992' ID) (CAP = .~07 BB~ i
~--' ~ -~~,,~..~,,~.xo
~' ~'~ I°~s~' I
m- ~ Straddle Pods Squeezed
9-5 8", 47.~, I .... , I ~ ~ ~ TOC ~ 9593' CTMD
N-~. BTRS ~1 ~] ~ /~ ~ '"
w~all0ndi ..... ,. See BHA.2oftelexFebl, 1900. Top of fish . 93~'m~:~:~:~: ' 6 B~ST JOINTS 'TOP 969~'
PERFORA~ONSUMMARY ~ ~ ~~ 31/2' 'X'NIPPLE
~ ~ ~ (eT)S) (2.7~*
SIZE SPF IN a 1/2 TB* TAIL
TER' AL OPE~SQZ'D ~ Im ~'
~ ~m m 9817'
ABOVE ERFS BE~ ND STRADDLE / m
4' 4 9810' - 9823' SQZD 4/24/~~~ ................................~ C~ 99~ - 1 ~'
~;,~. ~ ;;;;:;;X: : : ~_.....................~
2 !/8" 4 98~ - 9920' O[ EN ~ Cement 101~ - 10120'
I I
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
4-12-76 INITIAL COMPL~ION
12-20-84 RWO
· 26/g6 Tave Post Sqz pods WELL: E-04 (24-31-12-14)
1/20/98 JTP ~m~le ~ueeze
~o~ ~w .~c~,s. BP Exploration (Alaska)
I
GAS LIFT MANDRELS
· .
8 3975' 3910'
7 5605' 5298'
6 7140' 6602'
5 8268' 7660'
4 8415' 7725'
McblIRRAY 'FMHO" wi 1" )K LATCH
3 9389' 8550'
2 9489' 8634'
I 9590' 8719'
WELLHEAD:McEVOY ~ I ' BF. ELEV = 28.60'
ACTUATOR:
O I4 1/2''SSSV LANDING NIPPLE(3.813" ID)
FOC --~ I ~ · GAS LIFT MANDRELS
13-3/8", 72#/ft, 12840'
N-80, BTRS.
N-° MD(BKB) TVDss
1
2
3
] 4
4 1/2", 12.6#/ft, L-80, IBT 6
TUBING
BING ID: 3.958"
PACITY: .01522 BBL/FT
KOP: 8,350'
MAX ANGLE: 93 deg. Target #2
7" Liner Top @ 8150' MD -~ 4-1/2" Liner Top
~ L~ @ 9850' MD 4-1/2" Liner Shoe
12,828'
MD
Whipstock @ 8300' MD
5-1/2" Sliding Sleeve t~' ~ 7" Liner Shoe
~,, 8484' MD ~_ ~ @10,006' MD
9-5/8 Packer ___
Top of Fish @ 9300'
TOC @ 9593' CTMD
CaC,o, 3 fill fr~o,m
9817-9760
3 1/2 .... XX" Plug
I
I
Cement 9980 - 10000'
Cement 10100- 10120'
PBTD I 10..141'
7", 29#/ft, L-80,BTCI 10,195'
II-)ATF RI::V RY C;OMMFNTR I PRUDHOE BAY UNIT
Proposed Sidetrack ComDletJon WELL; E-O4A
· ' APl NO: 50-0:29- 20184-01
SEC 6 - TN 11N; RGE 14E
BP I Exploration (Alaska)
GAS LIFT MANDRELS
N-° MD(BKB) TVDss
1
2
3
4
5
6
STATE OF ALASKA
ALAS?~0, IL AND GAS CONSERVATION OOMMISSI~'~
REPORT C. SUNDRY WELL OPEr, ATIONS
1. Operations performed: Operation shutdown Stimulate__ Plugging__
Pull tubing~ Alter casing Repair well
Perforatex
Other X
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0, Box 196612, Anchora_c/e, Alaska 99519-6612
4. Location of well at surface
1158' SNL, 502' WEL, Sec. 06, T11N, R14E, UPM
At top of productive interval
199' NSL, 3195' WEL, Sec. 31, T12N, R14E, UPM
At effective depth
414' NSL, 3395' WEL, Sec. 31, T12N, R14E, UPM
At total depth
435' NSL, 3418' WEL, Sec. 31, T12N, R14E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE = 56. 52
7. Unit or Property name
Prudhoe Bay Unit
feet
8. Well number
E-04 (24-31-12-14) PBU
9. Permit number/approval number
75-70 / 7-966
10. APl number
50.029-20184
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10195
BKB 9295
10141
BKB 9249
feet
feet
feet
feet
Plugs (measured)
Junk (measured)
Casing Length Size
Structural ..
Conductor 104 20
Surface 2812 13 3/8
Intermediate 9103 10 3/4
Production -- ', 9 5/8
Liner 1514 7
Perforation depth: measured
Cemented
4388 sx
1470 sx
593 sx
Measured depth
132
2840
9131
8681-10195
9687-9712, 9727-9742, 9755-9795 (straddle packed)
,qR l ()-.qRP.g. .qR4.g-.q.q24 I'nnn-.~tr~ddl~, n~eck~,d)
true vertica~subsea)
8799'-9003 (five intervals)
Tubing (size, grade, and measured depth,~ 1/2" L-80 to 8565' with 3 1/2" tailpipe to 9817'
True verticaldepth
BKB
132
2840
8388
8007-9295
RECEIVED
JUL 20 1998
Naska Oil & Gas Con6. Commi~on
Ancl~ra~
Packers and SSSV (type and measured depth~ 5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9798';
5 1/2" SSSV at 2125'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
ORIGINAL
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
1290 2334 43 0
1676
Subsequent to operation
1930 3169 249 0
1566
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
17. I hereby certif,~'that the foreb/~ing is true aJad correct
Signed
Form 10-4~)4~Re~ ~)~1~5~ - "-- -
16. Status of well classification as:
Oilx Gas Suspended
Service
to the best of my knowledge.
Title Technical Assistant III
SUBMIT IN DUPLICATE
E-04
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
01/19/98 A Packer Squeeze was performed using the following fluids:
SUMMARY
RU HB&R to pump down IA. Initial pressure was 1150 psig. IA pressured up
after 37 bbls away and would only take 1.6 BPM at 3000 psig. RU CTU with
2.25" cementing nozzle and stingers. Tried to BH tubing but well began to
pressure up. POPed well to LDF with chokes cracked and HB&R circulating
water down IA at max rate. RIH circulating gas out to flowline. Tagged scale at
9755' CTMD and did not correct depth. Cooled sump with 230 bbls of FSW. IA
was fluid packed with 625 bbls of FSW and 120 bbls of diesel. Injectivity was 2
BPM at 1150 psig and I BPM at 790 psig. Mixed and pumped 36 bbls of
cement. Laid in cement from 9745' - 9400'. Established approximately 1500
psig of squeeze differential at the perfs with 16 bbls of cement out the nozzle.
Pumped the remaining 20 bbls into the IA taking returns down the flowline and
holding WHP constant at 500 psig. Jetted tubing from 9400' to surface while
holding 500 psig on well. FP tubing and FL with methanol. Coil froze off in the
lubricator at 97'. RU HB&R and circulated heated diesel through coil. Coil came
free. Left well SI with 500 psig on tubing and IA. Estimated TOC 9400' CTMD
(assumes no U-tubing).Estimate approximately 4 bbls of cement behind pipe.
Estimated TOC in IA at 9165'.360'-400' of cement remaininq in tubing.
Fluids Pumped
BBLS. DescriptiOn
935 Fresh Sea Water
247 Slick Sea Water
-20 Fresh water
64 Methanol '
36 Cement
1302 Total ' '
STATE OF ALASKA
ALA,S~OIL AND GAS CONSERVATION COMMISS[C:~
REPORT (,, .': SUNDRY WELL OPE. 'ATIONS
1. Operations performed: Operation shutdown__ Stimulate Plugging
Pull tubing__ Alter casing Repair well
Perforatex
Other X
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchoraoe, Alaska 99519-6612
4. Location of well at surface
1158' SNL, 502' WEL, Sec. 06, T11N, R14E, UPM
At top of productive interval
199' NSL, 3195' WEL. Sec. 31, T12N, R14E, UPM
At effective depth
414' NSL, 3395' WEL, Sec. 31, T12N, R14E, UPM
At total depth
435' NSL, 3418' WEL, Sec. 31, T12N, R14E, UPM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE = 56.52
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
E-04 (24-31-12-14) PBU
9. Permit number/approval number
75-70 / 7-966
10. APl number
50-029-20184
11. Field/Pool
Prudhoe Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10195 feet Plugs (measured)
BKB 9295 feet
10141 feet Junk (measured)
BKB 9249 feet
Casing Length
Structural ..
Conductor 104
Surface 2812
Intermediate 9103
Production ..
Liner 1514
Perforation depth:
Size Cemented Measured depth
20 132
13 3/8 4388 sx 2840
10 3/4 1470 sx 9131
: 9 5/8
7 593 sx 8681-10195
measured 9687-9712, 9727-9742, 9755-9795 (straddle packed)
True verticaldepth
BKB
132
2840
8388
800~9295
.qR I ~3-.qRP.'~. .qR4.'~-.q.q24 [nr)n-.wtr~rtcil~. n~ckp, rt)
true vertica~subsea)
8799'-9003 (five intervals)
ORIGINAL
Tubing (size, grade, and measured depths 1/2" L-80 to 8565' with 3 1/2" tailpipe to 9817'
Packers and SSSV (type and measured depth~ 5/8" Baker FHL packerat 8565~; 7" BakerSAB ~:~`~r~ ~V ~ p5 1/2" SSSV at 2125'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 1290 2334 43
Subsequent to operation 1930 3169 249
15. Attachments I 16. Status of well classification as:
Copies of Logs and Survey~run__ ~., I ~,~
Daily Report of Well Opera. ns__ /'~? I Oi,._~ Gas Suspended
17. I hereby ce~ifyCthet the f,~r~g°ing is ~.e/.~d ~rrect to the best of my knowledge.
Signed~~~~, ~//~ ~'/~ TitleTechnicalAssistantlll
Form 10'-404[Rev 06/1-~/~)t8 _ v .
1676
1566
Service
SUBMIT IN DuPLI(~A'TE
WELL E-04
NRWO/Reperf Operations
4/24/96
A NRWO GSO (Cement Squeeze) was performed using the
following fluids:
SUMMARY
Well was SI on arrival. Liquid pack well and cool sump. Tag TD at 10133'. Flag
pipe @ 10120'. Pump 13 bbl of acid and let soak for15 min. Well was on a
vacuum, laid in 12 bbls of cement and well was still on a vac. SD and hesitate
for 1 hour. Build squeeze pressure to 2800 psi. Start live reverse out and lost
the squeeze at 9860', WHP dropped about 350 psi. RBU, make jet passes, RBU
again. Pump 10 bbls 10% HCI. Layed in 12 bbls cement from 10000 ft. Ramp up
to 2800 psi squeeze pressure. Estimate 2 bbls cement behind pipe. Live reverse
out to 9980 ft. Jet to WCTOC and back down. Jet GLMs. Reverse bottoms up.
Well held pressure test. Pumped 86,000 scf nitrogen to underbalance well..
FLUIDS PUMPED
BBLS.
1712 SEAWATER
12 METHANOL
13 15% HCL
10 1 O% HCL
24 CEMENT
30 FRESH WATER
4/26/96
The following interval were reperforated using 2 1/8"
guns, 4 SPF, excentralized orientation and zero phasing.
9890'- 9920' MD
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
~CHOP~GE
AK, 99501.
Date: 7 May 1996
RE: Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
?~~B-IO (11-05-10-14)
Z-02A
q .q z-02A
DESCRIPTION
PFC/PERF FINAL BL+RF
PFC/PERF FINAL BL+RF
PFC/PERF FINAL BL+RF
PFC/PERF FINAL BL+RF
PFC/PERF FINAL BL+RF
GR/CCL FINAL BL+RF
PFC/PERF FINAL BL+RF
ECC No.
Run ~ 1 2384.03
Run # 1 4468.05
Run # 1 4912.06
Run # 1 6053.02
Run ~ 1 6225.02
Run ~ 1 6654.02
Run # 1 6654.03
Received by:
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
~Or~07) 563-7803
Date:
LARRy GRANT
Attn. ALASKA OIL + GAS CONSERVATioN
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Dear Sir/Madam,
Reference:
Date: 21 APril 1995
RE:
Transmittal of Data
ECC ~: 6225.01
Sent by: PRIORITY MAIL
Data: PDK
PRUDHoE
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: 1
LDWG TAPE + LIS
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 8 Street
SUite 201
Anchorage, AK 99518
Or FAX to (907) 563_7803
Received by:
Date:
Run # 1
Please si~n and ~e%u~n ~:
Petro%echnical Da%a Oen%e~.
,.o..ation (Alaska) In~
900 ~:~st ~enson Boulevard
_~eho~a~e, ~aska ~508 ..
~l. as.l/a 0ii & Gas Cons. L~UIItJlIlS,~;,L'.''
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 17 April 1995
RE.. Transmittal of Data
Sent by: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
~-~ B-17 (43-25-11-13)
DESCRIPTION
CN/GR FINAL BL+RF
CN/GR FINAL BL+RF
CN/GR FINAL BL+RF
PDK FINAL BL+RF
ECC No.
Run ~ 1 992 10
Run ~ 1 5605.02
Run # 1 5611.05
Run ~ 1 6225.01
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by:
Date:
Plem~e ~J,g~ and ~eturn
PetroteehnleaL Data Centet~
BP Explor~ttoa (Aluka)
900 East Benson Boulevexd
Anohora~, Algebra
RECEIVED
APR 2 0 1995
Alaska 011 & Gas Cons. Commission
Anchorage
Received b3'
Date
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date:
7 July 1~94
RE:
Transmittal of Data
Sent by: ATLAS WIRELINE
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
,,~PL LEAKDET FINAL BL
1PL LEAKDET FINAL RF
C-24 (14-19-11-14)
/~ PLS FINAL BL
! PLS FINAL RF
/ L GASENTRY FINAL BL
1 PL GASENTRY FINAL RF
~--~% %~ W-30 (11-2!-11-12)
/~1PDK/GR FINAL BL
PDK/GR FINAL RF
1 PDK/BORAX FINAL BL
PDK/BORAX FINAL RF
/~ PDK/GR FINAL BL
1PDK/GR FINAL RF
/ PDK/GR FINAL BL
1 PDK/GR FINAL RF
Z-!2 (21-30-11-12)
/~PDK/GR FINAL BL
1PDK/GR FINAL RF.
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Date:
ECC No.
Run # 1 5607.05
Run # 1
Run # 1 3457.04
Run # 1 '"
Run # 1 6225.00
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
6228.00
Run # 1
Run # 1
6026.02
Run # 1
Run # 1
3752.01
Run # 1
Run # 1
4031.03
BP
To:
Distribution
BP ExploraUon (Alaska) inc.
900 East Oenson Ooulev~rd
P.O. Box 196612
AnCt~Oracje, Atast(a 99519-6612
(907) 561-5111
Date: 14-SEP-89
Transmittal: 80355
From:
information control
Well Records LR2-1
subject:
Enclosed is your
questions, please
C-01
C-07
E-04
E-10
E-23
G-15
j-08
X-12
y-01
copy of the material listed belOW- If
contact BP well Records at (907) 564-4445-
09/02/89 91 8750-9140
pITS 09/03/89 91 9440-11747
9500-10113
pITS 08/30/89 91 11300-11694
TEMP 08/31/89 91 11300-11579
PROD-F 09/01/89 91
pROD-F 08/26/89 91 9800-10207
PROD-F 09/02/89 92 11300-12400
300-9250
CCL
GAS LIFT/PROD 08/31/89 92
TEMP/GAS LIFT 08/30/89 92 2800-11500
you have
any
camco
camco 5"
5"
Camco
5"
camco
5"
camco
camco
camco
5"
camco
camco
Distribution:
ARCO
cHEVRON
ExxON
GEOSCIENCES
HousTON
MOBIL
pHILLIPS
RESERVOIR
sTATE OF ALASKA
ARCHIVES
ll ka Oil & Gas Cons. commissioc
Anchorage
TO:
DALL~\S
ARCO
CHEVRON
EY~XON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
INDEXED
STANDARD
ALASKA PRODUCTION
Date: 02/17/88
rt: 78557
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to thls office:
~ A-2 PITS 02/11/88 #1 11150-11490 Camco 5"
~"~A-13 Borehole Audio Tracer Survey 01/15/88 #1 100-8650 GO 2"
'"'~A-13 Temp 01/15/88 #1 100-8650 GO 2"
~'~ A-27 Temp 01/31/88 #1 Surf-8543 GO 5"/2"
'"'~A-27 Borehole Audio Tracer Survey 01/31/88 100-8530 GO 2"
"--.5C-1 CCL/Pacer Setting 02/10/88 #- 7400-8850 Sch 5"
"~- D-27 Perf. Record 02/08/88 #2 9300-9676 Sch 5"
~ E-1 Prod. Profile 02/05/88 #1 9300-9750 Camco 5"
'"'~:E~4: Perf. Record(REPLACEMENT) 01/19/88 #1 9500-10076 Sch 5"
'""~'-'E-~5 CBT 01/26/88 #1 8600-11470 Sch 5"
~-E-25 CET 01/26/88 '#1 8600-11470 Sch 5"
R-23 Temp. 02/01/88 #1 11450-12100 Camco 5"
Victoria Aldridge
INFORhtAT ION CONTROL
Wel I Records LR2-1
Standard Alaska /~
Production Company
900 East Benson Boulevard
P.O. Box 19661 2
Anchorage, Alaska 99519-6612
(907) 561-5111
February 10, 1988
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well E-4 (24-31-12-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
JTB:JAM~
Enclosures (4)
CC: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
E-4 Well File
~, Supervisor
Gravity Drainage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Plugging [] Perforate [] Pull tubing []
Operation performed: Operation shutdown [] Stimulate []
Alter casing [] Other []
Name of Operator
Standard Alaska Production Cornpany
Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
· Location of well at surface
1158'SNL, 502'WEL, Sec. 06, T11N, R14E, UPM
At top of productive interval
199'NSL, 3195' WEL, Sec. 31, T12N, R14E, UPM
At effective depth
414'NSL, 3395'WEL, Sec. 31, T12N, R14E, UPM
At total depth
435'NSL, 3418' WEL, Sec. 31, T12N, R14E, UPM
1. Present well condition summary
Total depth: measured
true vertical
10195 feet
BKB 9295 feet
Plugs (measured)
5. Datum elevation (DF or KB)
KBE = 56.52 feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
E-4 (24-31-12-14) PBU
E~. Approval number
7-966
9. APl number
5 0 - 029-20184
0. Pool
Prudhoe Oil Pool
Effective depth:
measured 10141 feet
true vertical BKB 9249 feet
Junk (measured)
Casing Length Size Cemented Measured depth
Structural --
Conductor 104 20 132
S u rface 2812 13 3/8 4388 sx 2840
Intermediate 9103 10 3/4 1470 sx 9131
True Vertical depth
BKB
132
2840
8388
P rod uction -. x 9 5/8
Liner 1514 7 593 sx 8681-10195
Perforation depth: measured 9687-9712, 9727-9742, 9755-9795 (straddle packed)
9810-9823, 9843-9924 (non-straddle packed)
true vertical (subsea)
8799'-9003 (five intervals)
Tubing (size, grade and measured depth) 5 1/2"L-80 to 8565' with 3 1/2"tailpipe to 9817'
Packers and SSSV (type and measured depth) 9 5/8" Baker FHL packer at 8565'; 7" Baker SAB packer at 9798'; 5 1/2" SSSVat 2125'
2. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
,
Prior to well operation
Subsequent to operation
Represerltative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
1290 2334 43 0
1930 3169 249 0
Tubing Pressure
1676
1566
4. Attachments
Daily Report of Well Operations []
Copies of Logs and Surveys Run []
5, I hereby certify that the foregOing is true and correct to the best of my knowledge
Sig~ ~..O~.~-o'v~,~. Title Supervisor GravityDrainage
Form 10-404'"Rev. 12-1-85
Date
Submit in Duplicate
WellE-4 (24-31-12-14) PBU
Addltlonal Perforating Operations
The following additional interval was perforated January 19, 1988
using Schlumberger 2 1/8" Ultrajet carrier guns at 4 spf:
9858' - 9924' MD BKB (8946' - 9003' TVDss)
Depths are referenced to BHCS, 2/2/76.
A lubricator was installed and tested to 3500 psi for all well work.
The well was returned to production immediately following perforating
operations.
jam
2/08/88
0800Z
Standard AIDe, ko
P,odu¢lmn Company
900 Eo~.! I~'n~on
P O
An(ho~o~e. Alo~O ~19 6612
INDEXED
.,
DALLAS
ARCO
CHEVRON STA N D A R O
^ I A C'"/~
,.,L ~or- ~, PPODUC. F IC)N
EXXON
T~CO 0ate: 02/02/88
TO: MOB~ ~: 785~4
PHILLIPS
..
STATE OF A~S~
GEOSCIENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being subml*ted herewith. Please acknowledge receipt by
signlng a copy of this letter and returnlng it to this office:
C-25
~'~ c-30
~ E-27
Perf. Record 01/25/88 #3 10000-10301 Sch 5"
CBT 01/23/88 #1 8400-9700 Sch 5"
Perf. Record 01/19/88 #1 9500-10076 Sch 5"
Perf. Record 01/20/88 #1 9000-9667 Sch 5"
Rece i ved
Date
k J "';--;'~,.~ " We,, Records LR2-I
A und ol the O.9,nol 5tondu,d O.I Comonny
Fou,"ded ,n Cle-elond. O~,o. ,n 1870
Standard Alaska
Production Compa
900 East Benson Bou,~
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-.5111
STANDARD
ALASKA PRODUCTION
December 18, 1987
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well E-4 (24-31-12-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
Yours very truly,
JTB: JAM ~
Enclosures (9)
cc: J. L. Haas (MB12-1)
E-4 Well File
~. Brown, Supervisor
J.
Gravity Drainage
A unit of the originat Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
~"'"' STATE O F ALASKA ~'"'~'~
AL,.,~,,,-, OIL AND GAS CONSERVATION CO~v~rv,.,SSlON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] stimulate [] Puli tubing [] Amend order [] Perforate X~ Other []
2. Name of Operator 5. Datum elevation (DF or KB)
STANDARD ALASKA PRODUCTION COMPANY KBE = 56.52 AMSL feet
3. Address 6. Unit or Property name
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit
4. Location of well at surface
1158' SNL, 502' WEL, Sec. 06, TllN, R14E, UPM
At top of productive interval (top Ivishak/Sadlerochit)
199' NSL, 3195' WEL, Sec. 31, T12N, R14E, UPM
At effective depth
414' NSL, 3395' WEL, Sec. 31, T12N, R14E, UPM
At total depth
435' NSL, 3418' WEL, Sec. 31, T12N, R14E, UPM
7. Well number
E-4 (24-31-12-14) PBU
8. Permit number
75-70
9. APl number
50--029-20184
10. Pool
Prudhoe Oil Pool
11. Present well condition sUmmary
Total depth: measured
true vertical
10195 feet Plugs (measured)
9295 feetBKB
Effective depth: measured
true vertical
10141 feet Junk (measured)
9249 feet BKB
Casing Length
Structural --
Conductor 104 '
Surface 2812 '
Intermediate 9103 '
Production __
Liner 1514 '
Perforation depth: measured
Size Cemented
20"
13 3/8" 4388 sx
3 5 1470 sx
10 ~ x9 ~
7" 593 sx
, 9755'-9795'
9687'-9712' , 9727" -9742'
9810'-9823" , 9843'-9858'
true vertical (ss)
8799' - 8946' (five intervals)
Tubing (size, grade and measured depth)
5 1/2" L-80 to 8565' with 3 1/2" tailpipe to 9817'
Packers and SSSV (type and measured depth)
9 5/8" Baker FHL pkr. @ 8565'; 7" Baker SAB pkr. @ 9798'
Measured depth
132'
2840 '
9131'
8681'-10195'
(stradd'le-packed)
True Vertical depth
BKB
132'
2840 '
8388'
8007-9295 '
(non-straddle-packed)
ECE V D
';EC 2 i 19 7
_ ~a,¢.m 0il & 6as Cons. C0mrnissi0r~.
;5 sssv
12.Attachments
Description summary of proposal [] Detailed operations program [] BOP sketch
13. Estimated date for commencing operation
January 1988
14. If proposal was verbally approved
Name of approver
Date approved
15..I hereby certify that the foregoing is true and correct to the best of my knowledge
Sig~ed ~ Title Supervisor Gravity Drainage Date Iz-/lT/~7
J.~/~. Brown Commission Use Only
Conditions of approval Notify commission so representative may witness I Approval No. -7
~ Plug integrity. ~ BOP. T~st ~ ~cationclearancel~.. . , - --~
Returned ~~ ~~~~_~
ORIGINAl- SIGNED BY '/~ -~ ~ ;F7
by order of
Approved by LONNIE C. S~tT~ Commissioner the commission Date
Form 10-403 Rev 12-1,85
Submit in triplicate
W~ll E-4 (24-31-12-14) PBU
Additional Perforating Proposal
We propose to perforate the following intervals during January 1987 at
4 spf.
Add'l. 9858' - 9924' MD BKB (8946' - 9003' TVDss)
Depths are referenced to BHCS, 2/2/76.
A lubricator will be installed and tested to 3500 psi for all well
work. The well will be returned to production immediately following
perforating operations.
jam
12/17/87
0800Z
FLOW TUBES
& PACKOFF
GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE
VALVE
GREASE LINE
RISER
,~' ' 4/' BOP
GREASE
-MANIFOLD
GREASE
PUMP
· .-~ GREASE
RESERVOIR
Slanda,'d Alaska
P, oduction Compo"
900 Eosl Bern, on Bo,.
P.O. Bo~ 196612
Anchorage, Alaska 99519-6617
!9071 .564-51 I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 10/21/87
TO: MOBIL · Ti: 78247
PHILLIPS
GEOSC IENCES
STANDARD
Al. ASF~ PRODUC 1-1C)N
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
E-3¸
F-9
J-2
J-20
J-26
J-27
M-13
Production Profile
Temp/Flowmeter
Perf. Record
Production Profile
Perf. Record
Production Profile
Injection Profile
10/02/87 #1
09/27/87 #1
10/11/87 #1
10/01/87 #1
10/14/87 #1
10/03/87 #1
10/01/87 #1
12250-12675 Camco 5"
9700-10220 Camco 5"
9071-10274 Sch 5"
11900-12170 Camco 5"
9400-10647 Sch 5"
9400-9550 Camco 5"
9300-9633 Camco 5"
Rece i ved
Date
Wel I Records LR2-1
A u,~,t of the or,g'~ol $,ondord 0, t Company
Founded ,n Cleveland 0~,o ,n 1870
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (9071 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
TO: SFO/UNIT/STATE:
(-Marathon)
TEXACO
MOBIL
PHILLIPS
Date: 8-07-85
__
T#: 76369
STATE OF ~
BPAE
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewit~lease acknowledge receipt by signing a
copy of this letter and returning it to this office:---
,,
SFO/UN T/S AT .:
E-4
1'-3
1,1-17
R-24
Completion Record
Packer Positioning
GR/CCL
Temp ' Log
HP Survey
Temp Log
Completion Record
a~j~ 0~i & Gas Cons,r~o~io~
Anchorage
11-22-84 8296-8660 Sch #1 5"
2-06-85 10506-11100 Sch #1 5"
7-20-85 11000-11400 Camco #1
5-14-85 175-9543 Sch #1
7-21-85 11000-11500 Camco #1
6-01-85 9200-9572 Sch #1
SFO/ARCO ONLY:
5"
5"
R-24
T-1
CBL
CBL
12-17-84 8 900-9772 Sch #1 5"
1-07-85 10380-10952 Sch "ffl 5"
R£C£1VED
-? ....
· Perkins LR 2-1
Technical Documentation
~UG 0 ~~ Records Management
aas Cons. Commission
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO~ SFO/UNIT/STATE: TE]CACO
(-Marathon) MOBIL
PHILLIPS
STATE OF AK
BPAE
,_
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (9071 265-0000
MAIL: POUCH 6;612
ANCHORAGE, ALASKA 99502
Date: 8-07-85
T#: 76369
REFERENCE:
SOHIO CASED HOLE FINAL LOGS r~n
The following material is being submitted herewith owledge receipt by signing a
cop~t of this letter and returning it to this office:-
·
E-4 '~
M-17
-24 J
Completion Record
Packer Positioning
CR/CC ,
Temp ' Log
HP Survey
Temp Log
Completion Record
SFO/ARCO ONLY:
11-22-84 8296-8660 Sch 0i
2-06-85 10506-11100 Sch 0I
7-20-85 11000-11400 Camco 01
5-14-85 175-9543 Sch 01
7-21-85 11000-11500 Camco 01
6-01-85 9200-9572 Sch 01
1!
5"
5"
5"
//5"
R-24
T-1
CBL
CBL
12-17-84 8900-9772 Sch #1 5"
1-07-85 10380-10952 Sch '01 5"
RECEIVED
~-: ;. ...... ;. ~,,~s Cons. ~C,~ommiss]o. Records Management
~o: SFO/UNIT/STATE:
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TEXACO
(-Marathon) MOBIL
PHILLIPS
· ~, ~.'~STATE OF: AK
BPAE
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Date:
T#:
2/1/85
75987
REFERENCE:
CASED HOLE FINAL LOGS
e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
12/12/84
11/13/84
12/19/84
11/12/84
12/22/84
11/19/84
SFO / S~ATE/mqlT:
B-2//j CH-CNL
B-8 '/.. CH-CNL
B-12~~ CH-CNL
C-11~ CH-CNL
D-4 /CH-C~
F-16'. CH-cNL
K-6/' CH-CNL 11/18/84
A-14>Cont. Flow Survey 11/12/84
C-2 Cont. Flow Survey 1/8/85
~GC-lC Cont. Flow Survey 11/9/84
/CC-lC Diff.Temp. 11/9/84
N-2/ Temp. 12/31/84
S-6~- EPL 9/12/84
E~4~ GR log 12/21/84
#3 9800-10528 Sch 5"
#11 8850-9779 Sch 5"
#2 8600-9344 Sch 5"
#3 9000-9923 Sch 5"
#3 9900-10674 Sch 5"
#2 8750-9620 Sch 5"
#2 8600-9356 Sch 5"
#1 9300-9750 GO 5"
#1 9800-10150 GO 5"
#1 0-3750 GO 5"
#1 0-3750 GO 5"
#1 10200-10574 GO 5"
#1 Surf.-10500 Sch 5"
#1 9500-10120 GO 5"
RECEIVED
.DAli
LR2-1
SOHtO ALASKA PETROLEUM coMPANY
11 "c" S'¥REF-J,
31 LASKA
ANCHORAGE', A
-i'ELEPHON E (90"D 561-5111
MAIL: pOUCH 6.612
ANCHORAGE', ALASKA 99502-0612
January 16, 1985
Alaska Oil & Gas conservation commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Cha%terton
Notices and ReportS on
duplicate is Form 10-403, Sundry report completes the
Enclosed in abov~-na~ well. ThiS' subsequent
Wells, for
workover of this well.
Very %ruly yours,
~ ~~.H. 'l
Enclosure
cc: Well File ~17
RECEIVED
J AN 1 ? 1985
Alaska Oil & Gas Cons. Commission
Anchorage
"'"- STATE OF ALASKA ,~',~
ALASKA OiL AND GAS CONSERVATION CON,,HISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL [] OTHER
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 75-70
3. Address 8. APl Number
P.O. Box 6-612, Anchorage, Alaska 99502 s0-029-20184
4. Location of Well
At Surface:
1153' SNL, 502' WEL, Sec. 06, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE - 56.52' ~MSL
6. Lease Designation and Serial No.
ADL 28299
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
E-4 (24-31-12-14) PBII
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] - Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [~ Other
Pull Tubing [] Other [] Pulling Tubing
(Note: RepOrt multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following work was performed during the workover on Well E-4.
1. Installed BPV. Moved in rig. Conditioned hole to 8.8 ppg NaC1. Set 2-Way check.
Nippled down tree. Nippled up and tested BOPE to 5000 psig. Pulled 7" tubing.
Recovered seal assembly. Cleaned out to 10,141~.
2. RIH and set RTTS at 8675". Pressure tested 9 5/8" casing and liner lap to 2500 psig, I
ok. Filled 13 3/8" x 9 5/8" annulus with diesel and tested to 1000 psig, ok.
3. Ran straddle-packer completion over top three perforated intervals (9687'-9712',
9727'-9742', and 9755'-9795'). 7" lower packer at 9809', 3~" tubing with 3 gas lift
mandrels, 9 5/8" upper packer at 8565', 5½" tubing to surface with BVN at 2125'. Set ~
packers and tested to 2500 psig, ok. [
4. Installed BPV. Nippled down BOPE. Installed and tested tree to 5000 psi. Changed 5½"
x 9 5/8" annulus over to 9.6 ppg NaC1. Displaced tubing to diesel. Moved rig off.
Installed and tested SSSV.
This work was completed on December 22, 1984.
RECEIVED
JAN 1 7 1985
Alaska 0il & Gas Cons. Commission
. Anchorage
14. I he~cer.~f~O~g is tr~,~n(~ c~rrect to the best of my knowledge.
Signed ~,~ "-""~',,,'~ ~ t._...~--,-_~~ TitlePist~'~£t D~'~ll~ng
The space below for Commission use ~o H, ~eiA~y '
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in' Duplicate
SOHIO ALASKA PETROLEUM COMPANY
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
November 14, 1984 -v'F~/ .....~
Enclosed, in triplicate., is Form 10-403, Sundry Notices and R~~_~_.~n
Wells, for the above-named well. This gives notice of intention to chan~-
tubing, install gas lift mandrels and install a mechanical straddle pack.
Very truly yours,
R. H. Reiley
District Drilling Engineer
RHR:IBG:ckg
111384
Enclosure
cc: Well File ~17
STATE OF ALASKA
ALAS~,,~ OIL AND GAS CONSERVATION ..-OMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER []
2. Name of Operator
._qohio _Al~_ska _Pe~'role~__'~__
3. Address
Pouch 6-612, Anchorage, Alaska
99502
4. Location of Well
At surface:
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE =' 56.~52'~ AMSL '
12.
I 6
. Lease Designation and Serial No.
ADL 282.99
7. Permit No.
75~70
8. APl Number
50- 029-20184
9. Unit or Lease Name
Prudhoe .. Day:.Unit
10. Well Number
E-4 {,24-31.12-14) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
Perforate
Stimulate
Repair Well
Pull Tubing
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
[] Alter Casing [] - Perforations [] Altering Casing
[] Abandon [] Stimulation [] Abandonment
~ Change Plans [] Repairs Made [] Other
~ Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date. of starting any.
proposed work, for Abandonment see 20 AAC 25.105-170).
The. objective, of this' workover is' to remedy the tubir~ leak, to install a mechanical
5~"
straddle pack. across the. top three sets of ~-rforations and to equip the. well with a ~ ~
tubing string including gas' lift mandrels-.. This ~rkover is' scheduled, for January 1984:'
lo
Rig up wireline.. Punch '7'" t~], in the. third joint above the PBR,
Change_ the 7'" tbg., and the. 7'"x 9 5/8"' annulus- over to kill weight NaCl. InStall BPV.
~bve. in rig.. R~m3ove. tree.. Install and test BOPE to 5000 psig..
Pull 7'" tubing.. Cut above PBR if necessary to recover.
RIH with_ 6:' bit and 7'" csg.. scraper, Clean out to PBTD.
RIH with. R~TS. Pressure test 9 5/8" casing..
Run straddle packer completion, over top three perforated intervals.. Completion to
consist of 7"' lower packer set at 49800, ;;3 1/2'" tbg,/blast jts. with. 3 GLM'"s, 9 5/8"
upper pac]~_r s-e~ at ..... ' "-' '
_~8560'~, 5 1/2. sliding sleeve, and 5 1/2" IPC ~3g.. With GLM stations
Ir~'tall BPV. Remove. BOPE, Install and test tree to 5000 psig. Move rig off. InStal]
and test
Subsequent %Ver~k l~epor~e~t
14. IC~h~r:~~ that the foreg_oing is true and correct to
Signed ~
the best of my knowledge.
Title District Drillinq Engineer
The space below for Commission use R,. ~-[i.. Rei'.leyk
Conditions of Approval, if any:
... ~3j~;~l~' ~, ~,~r~ COMMISSIONER the Commission
Approved by .~¢ ~ P.~ , By Order of
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in DuPlicate
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
TO:
EXXON
PHILLIPS
STAT . 0r
CENTI~L FILES (CCI/' s-Transmittal Only
J. ~ D h...2Lt~ JJ
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE ;907) 265-0000
MAIL: POUCH 6.612
ANCHORAGE, ALASKA 99502
Date: 6-27-84
CC#: 75452
REFERENCE:
SOHIO MAGNETIC LIS TAPES & LISTINGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
(4/82)
OPEN HOLE LOGS:
X-26 / SFT w/ Listing 6-26-84
CASED HOLE LOGS: ~
Tape Pos #
GO 0396 11338-01 03023
GE'4~ CH/CNS W/ Listing 6-25-84
-J-8L-' CH/CNS w/ Listing 6-26-84
· M-2/ CH/CNS w/ Listing 6-26-84
'N-6~e CH/cNs w/ Listing 6-26-84
· N-8~, CH/CNS w/ Listing 6-27-84
' A-4/ CH/CNS w/ Listing 6-28-84
' C-8b/ CH/CNS w/ Listing 6-27-84
· E-2ux' CH/CNS w/ Listing 6-28-84
' H-7v~ CH/CNS w/ Listing 6-28-84
J-gl CH/CNS w/ Listing 6-27-84
GO JTN#281832 03025
GO JTN#281834 03024
GO JTN#281836 03028
GO JTN#281833 03027
GO JTN#281835 03026
GO JTN#281838 03033
GO JTN#281838 03029
GO J?N#281840 03031
GO JTN#281841 03032
GO JTN#281839 03030
& ~0~: 'A~ks~i~.(~) ~ ~o a [~s~ aSoav~ aea~s 7ou shou[~ hav~
received the Tape(s) and Listing(s~ ~i?~t!y ~ the respective se~ice c~pany
Please confim th~
_ Devel6~ent GeoloEy
DATE ~ ~ Ak~ka ~ ~ i3as CoaS.'%0~s[onWel'l Records
A~ckorage
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
GETTY
TO. SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE OF AK
BPAE (Transmittal Only)
CENTRAL FILES (CCf!' s-Transmittal Only)
·
REFERENCE
3111 "C" STREEI
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: PQUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 6-26-84
CC#: 75443
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
'-"E'4 CH/CNL
~ J-8 . CH/CNL
~ M-2~.~/ CH/CNL
N-6 CH/CNL
N-8~ CH/CNL
5-17-84 fi4 9300-9878 GO 5"
5-19-84 #1 11400-12381 GO 5"
5-21-84 #1 ' 95~0~10356 GO 5"
5-18-84 #9 10250-11040 GO 5"
5-20-84 ffl 9400-9974 GO 5"
(4/82)
RECEIVED
DATE
:Carolyn Bishop
Development ,Geology
Well Records'
,.
2
JOHNSTON-MACCO
INTEROFFICE CORRESPONDENCE
TO:
FROM:
SUBJECT:
~SOHIO PRUDHOE BAY PARTNERS
J. C. ERDLE
.
PBU PRESSURE PRINTOUT FORMATS FOR
WELLS #D-22, D-16, C-2 & E-4
DATE:
NOVEMBER 4, 1983
Flopetrol Johnston/Schlumberger conducted four (4) pressure buildups in
the Prudhoe Bay Field in late August/early September. At that time, we
were not aware a specific format was required for the presentation of
PBU data. Our standard pressure printout was, therefore, used to
prepare well test interpretation reports for SOHIO and each partner.
Should we receive a contract to provide PBU services for SOHIO, the
report format will be changed to satisfy your requirements.
Ja~n~s C. Erdle, h.D.
Manager of Reservoir
Engineering Services
JCE:ch/20
JS-- 14.B BOND
JS-- 14.1 -B THIN
SOHIO ALASKA PETROLEUM COMPANY
S¥0
ARCO
- CHEVRON
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE 1907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
EXXON
~o~ SFO/UNIT/STATE:
(-Marathon)
GETTY
MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only) _
CENTRAL FILES (CC#'s - Transmittal Only)
Date: 12/12/83
Trans.l~ -
CC#: 74881
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
cOpy of this letter and returning it to this office:--
PBU Pressure Printout Formats for wells #D-22(8/24/83), D-16(8/26-28/83), C-2(8/30-9/1/83) &
Pressure Survey & BHPD
Il II 11 I!
BHPD
Pressure Survey"
BHPD
Static Gradient
BHPD
Pressure Survey & BHPD
Static Gradient
Pressure Survey & BHPD
I! I1 II II
Flowing Gradient
F-17 ~'~ Pressure Survey-& BHPD
F-17J Static
F_18w-/ ,,
H_6~-~
j_6~-~
M-6j
Pressure Survey & BHPD
Static Gradient
N-16"~ Pressure Survey
N-16~ Static Gradient
N-17~ " "
N-18~
N-18 gz
N_19~-~
Q-3 ~-'~" " "
& BHPD
Pressure Survey
Static Gradient
II Il
& BHPD
10/03/83 GO
09/30/83 Otis
08/31/83 Johnston Macco
09/23/83 Otis
08/27/83 Johnston Macco
08/23/83 Johnston Macco
10/03/83 Camco
09/02/83 Johnston Macco
11/13/83 Camco
11/25/83 GO
10/07/83 O0
10/06/83 Otis
11/22/83 Otis
10/29/83 Camco
11/27/83 Camco
10/30/83 Otis
11/04/83 Camco
10/09/83 Otis
11/02/83 Otis
11/24/83 CO
11/26/83 GO
12/02/83 Camco
11/07/83 Otis
11/09/83 Camco
12/04/83 Otis
11/17/83 Otis
11/16/83 Camco
12/05/8] Camco
E-4 (9/2-3/83).
ABOVE BY JOHNSTON-MACCO
Victoria Aldridge TP1-5
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
3111 "C"STREET
ANCHORAGE, ALASKA
TELEPHONE (9071 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
GETTY
TO' SFO/UNIT/STATE:
(-Marathon) MOBIL
Date: 9/23/$3
PHILLIPS
sCATE OF ~
BPAE (Transmittal Only) ,
CENTRAL FILES(CC#'s-Transmittal Only),
CC#: 74730
REFERENCE:
HIO CASED HOLE FINAL LOGS
/_~The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/UNIT / STATE:
.E-4 Spinner 9/3/83 9500-9870 Otis 5" #1
X-7 Cont. Flow-Survey 7/24/83 10700-11000 GO 5" #1
A=18 DFT 7/27/83 990021'0400, GO 5" #1
Y-i3 DFT 7/26/83 10100-10900 GO 5" #1
(4/82)
RECEIVED
-Victoria Aldridge TP
SE~ '' i~ Development Geology 1-5
Alaska 0il & Gas Cons. C0mmj$sj0n Well Records Anchorage
SOH I 0 CONF I DEItT I AL
SOHIO ALASKA PETROLEUM COMPANY
ARCO
To:. SFO/UNIT/STATE: MoM] ....... :
P~lhp~
_- , , ,_ ; ,
(-Marathon)
Logs
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 8/18/81 # 9943
REFERENCE:
C-1
C-6
D-3
D-4
J-10
X-9
SOHIO FINAL DATA 'PRESSURE DATA
following material is being' ~;ubmitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Bottom-Hole Pressur~ 'Data Form & Survey
!! I! !! !! !! !!
II II I1 Il II II
..
II II II II . II II
11 11 Il II II I1
II I! !1 11 11 !1
7/25/81 (Camco)
7/24/81 (Go)
7/22/81 (Otis)
7/28/81 (Camco)
7/31/81 (Co)
8/lo/81 (Go)
8/1/81 (Go)
,~CE,VEO '" '~%YG'J---' '.' ,.C.! g.
DATE
Carol Krieter
Development Geology
Well Records
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
ARCO
TO: EXXON
PHILLIPS
SFO
3111 "C" STR[
ANCHORAGE, At
TELEPHONE (907)
MAI L: POUCH
ANCHORAGE, ALA-(
1/19/81 #5~
ET I RES ENG 1
· 61~ 4
J 3 GEOJ/
I STAT TEC
J STAT TEC
CONFER:
FILF:
REFERENCE:
SOHIO MAGNETIC LIS TAPES
following material is being submitted herewith. Please a(;knowledge receipt by signing a
cop~Apf this letter and returning it to this office:-
.~> Magnetic Lis Tape & Listi"g 12/15/80 #3 #61266
,~-~3 ,, ,, ,, ,, ~/~8/~o #~ #~3~
Well Records
RECEI J~l,~ ~ v %ov,
DATE
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
SFO / UNIT / STATE
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
9/11/80 #350
REFERENCE:
SOHIO DATA
.~~__h~";;llowing material is being submitted herewith. Please acknoWledge receipt by. signing a
· copy of this letter and returning it to this office:-- _ ..............
FO/UNIT / STATE
-~arathon)
Bottom Hole Pressure Data Form & Survey
_ ,, ,, ,, ,, ,, ,,
X-2 " " " " " "
X-3 " " " " " "
(Dresser) 8/25-26/80
(Schlum.) 8/25/80
(Schlum.) 8/21/80
(Schlum.) 8/10/80
Well Records
RECEIVED '
DATE .19 __
SOHIO PETROLEUM CCMPAN~ !
Division of Sohio Natural Remurces Com'pany ' '
SOHIO-BP ALASKA PRODUCTION DIVISION
SFO/UNIT/STATE
(-Marathon)
TO:
SFO/UNIT/STATE ~ ......... '-
"" --mllip~_. .- - _.-
·
1~-7- L ~ · _-__L -
REFERENCE: ' i
.'
. SOHIO CASED HOLE FINAL DATA.
/ ' ' :l ! with
The following material is being s~bmi,ed here ' .
copy o[ this letter and returning iti~to t~i~ of[ice:-
}i ,'1 ..
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
B-9 TDT-M
B-13 Diff. Temp.
B-16 Perf. CCL
C-15 Temp.
Spinner
- Spinner
J-6 Spinner
M-1 Temp.
M-2 CCL
M-6 CCL
M-7 CCL
X-4 Mudlog
West Sak #14 Mudlog
4~24/80 #114
Please acknowledge receipt by signing a
3/23/80 #2 5"
7/13/79 #1 5"
2/29/80 #1 5"
3/25/80 #1 ' 5"
3/16/80 #1 5"
2/29/80 #1 5"
2/25/80 #1 5"
3/12/80 #1 5"
3/9-10/80 #1 5"
3/10-11/80 #1 5"
3/13-14/80 #1 5"
12/25/79-1/23/80 (State
3,/25/80-4/12/80 (State
· ,
only)'
only)
SFO/L'NIT/STATE:
Y-6 FDC/CNL
3/4/80
#1 2"
Well R~cords
DATE
19
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C" STR.EET
ANCHORAGE, ALASKA
TELEPHONE (907)265-0000
soHIO-BP ALASKA PRODUCTION DIVISION
C~-~rc~
TO: C,c t%-)' ~ - '--
SFO/UNIT/STATE
SFO/UNIT/STATE:
'INAL CASED ItOLE:
-Marathon)
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
4/18/80 #110A
--
F:~AE -
SEO .~'---~' --'---'~
/~ .\.
REFERENCE:
/ SOHZO DA~A
/
o he following material is ~ing submit~ herewith. Please acknowledge receipt by signing a
py of this letter and returning ~t to this office:-
A-2 Spinner 3/8/80 ~1
C-7 EPL 3/3/80 ~1
E-2 EPL 3/7/80 #1
F-13 Temp. Log 3/4/80 #1
J-1 Spinner 3/7/80 #1
R-2 DDNLL 3/3,/80 #1
R-5 TDT-M 3,/14/80' #1
R-6 TDT-M 3/13/80 #1
R-6 EPL 3/11/80 #1
X-4 Mudlog 12/25/79-1/23/80
X-5 Temp. Log 3/5/80 #1
NW#1 Spectralog 2./20/80 #1
II
2"/5" (1 Log)
5"
5"
5"
5"
5"
5"
11
RESSURE SURVEYS: D-1
Bottom-Hole Pressure Data Form& Survey
I1 II II II II II
II II II Il II II
II II II II II II
3/10/80(Otis)
3/17/80(Go)
3/16/80(Otis)
2/11/80 (Go)
Carol Kr~eter
Well Records
SOHIO PETROLEUM COMPANY
Division of .Sohio Natural Resources Company
SOHIO-BP ALASKA PRO'DUCTION DIVISION
3111 "C" STREET . '.
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO:
STATE OF ALASKA
Afask8 Ci! & Gas Qo,~=~,r'¢~.',fo.:~
3001 Porcupine Di'ive
Anchorage, /~il~,~.k¢ 09501
Attn: Mr. H, Hamilton
STATE/UNIT/SFO
1/2z/80
?o/
ATE/UNIT (minus
Marathon) :
REFERENCE:
SOHIO ~¢ELL DATA
y The following material is being submitted herewith. Please acknowledge receipt by signing a
copy.of 'this letter and returning it to this office:-
C-4 EPL i/i/80 #2 5"
G-4 CNL 12/20/80 #2 5"
A-7 12/24/79 Bottom-Hole Pressure Data Form & Pressure Survey
B-13 12/10/79 " " " " " " "
C-1 12/28/79 " " " " " " "
C-9 12/13/79 " " " " " " "
C-10 12/22/79 " " " " " " "
E-2 12/31/79 " " " " " " "
12/23/79 " " " " " " "
1/1/80 " " " " " " "
F-2 1/7/80 " " " " " " "
F-3 1/1/80. " " " " " " "
F-5 12/21/79 " " " " " " "
F-6 12/23/79 " " " " " " "
F-7 12/29/79 " " " " " " "
F-S 1/2/80 " " " " " " "
G-2 1/5/80 " " " " " " "
N-1 12/7/80 " " " " " " "
N-2 12,/20/79 " " ...... " "
N-8 12/_4/_7_9 ............... Bottom-Hole Pressure Data Form & Pressure Surx
Carol Kr~eter
///'" ~"//"?./f~'~'//× ~/~,1~'~ '/'~/~/?.,,,/L~~''- _..~ 1~ Re c o r d s ;. ~, ,-.. ," ,
[
DATE 19 :
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
REFERENCE: Well Data Transmission
The following material is being submitted herewith. Ple~e acknowled, ge receipt by signing a
copy of this letter and returning it to this office:-
'Cased hOl'e 10'g,S' 'for. 'the' 'folloWin~ .... io' op'erated we'ils:
F-4 CNL Run 3
C-2 EPL Run 1
D-5 CNL Run 1
C-1 CNL Run 1
D-3 CNL Run 1
J-1 CNL Run 1
C-2 CNL Run 3
C-6 CNL Run 3
CNL Run 2
CNL Run 2
N-8 CNL Run 2
Full Bore Spinner
COlette Traa~ /'
Well Records
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
SOHIO-BP ALASKA PRODUCTION DIVISION
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO:
State of Ala.s~
Department of Natural
Division of 0il &: Gas Conservntton
3001 Porcupi,.~e Dri.c
Anchorage, Alaska ~;!~50'1
ATTN; MR. H. ~:" .,.-,.:,\,
Unit/State/P&P
January 29, 1979
REFERENCE: ~:~11 Data Transmission "~/",:-'
"~61&:,',,90
The following material is being submitted herewith. Please acknowledge receipt by signing
copy of this letter and returning it to this office:--
.... Logs~.pr the-following Sohio operated well:
L GC-31~ ",~... . BHCS Run 1,2 2"
~ .......... DIL Run 1,2 2"
FDC Run 1,2 2"
tE-t
E-2
/' N-8
Transient Pressure & Flowmeter/Data Packet
Pressure Data Packet (corrected)
Gov. Sect ~11 Transient Survey (corrected)
~~.%~Transient Pressure Survey/Data Packet
'~ansient Pressure Survey/Data Packet
1-15-79
12-5-78
7-22-78
1-21-79
1-19-79
.-'
t -/'~ (' t';L," ' v
Colette Tracy
19
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
DEV-PB-250/8
TO: State of Alaska August 24, 1978
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Dr.
Anchorage, AK 99509
Attn: Mr. H. Hamilton
,'7
REFERENCE:
The following material is being' submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
D-1
D-3
D-4 " " " - Governmental
Transient Pressure Survey - Governmental
E-5 " " " "
G-2 " "" " "
G-3 Transient Pressure Survey - Key Well
J-5
Transient Pressure Survey - Governmental Section
Transient Pressure Survey - Post Acidization
Section
Section
Governmental Section Well Transient Survey
Colette Trac~"
Well Records
RECEIVED
DATE 19
SOHIO PETFIOLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Department of Natural Re~ourc~
Division of Oil & Gas Conserw~t,.on
3001 Porcupine Drive
~eahorage, Alaska 99504
~TTN~ MR. II. HAMILTON
3111 "C" STREjET'. '
ANCHORAGE, ALASI[ A-
TELEPHONE (907) 265-0000
-.... .:
MAIL: POUCH 6-612 .
ANCHORAGE, ALASKA 99502
August 21, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:
Key Well Transient Survey for the following wells:
N-7 G-3
Key Well Initial Transient Pressure Survey for the foll, qwing yells:
A-5 C-2
Initial Transient Pressure Survey for the following wells:
C-8 A-1 A-2 A-3 A-8 B-4 C-1 C-5
Governmental Section Transie~~ssure
N-8 N-2 g-2 D-4 D-1 E-3("E-'!.~...)E-5
Survey for the followin.~ wells:
G-2 H-4 H-5 J-5 M-3 M-4
Initial Static Surveys for the following well:
B-3A
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Department of Natural Resources
Division of Oil and Gas, Conservation
3001 Porcupine Dr.
Anchora§g, Alaska 99504
Attn: Mr. O.K. Cilbreth
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
DEV-PB-250/8
June 16, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
Initial Static Pressure Su.rveys for the following wells:
]1)--3 June 8, 1977
D-4 " "
D-5 " "
8/l/77
8/l/77
June 8, 1977
F-2 " "
F-3 " "
F-5 " "
F-6 " "
F-7 " "
N-3 12/6/77
N-5 June 8, 1977
N-8 " "
Colette Tracy
Well Records
RECEIVED
DATE 19
BP ALASKA INC.
T°:State of Alaska
Department of Natural Resources
P. O. BOX 4-1379
3111 "C"STREET
ANCHORAGE, ALASKA 99509
TELEPHONE (907) 278-2611
DEV-PB-250/8
February 17, 1978
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attn: Mr. O. K. G±lbreth
REFERENCE:
The following material is being submitted herewith. Please acknbwledge receipt by signing a
copy of this letter and returning it to this office:-
sepia and 1 print for the following SOHIO operated wells:
TDT-M Run 2
-, Spinner Run
F-5 Spinner
F-8 " "
.
·
G-4 " "
H-2 CCL& Perf. Run 1-5
Mm5 " " Run 1-3
High Resolution Thermometer
Run 1
Colette Tracy
Well Records
BP ALASKA
INC.
P. O, BOX 4-1379
3111 "C" STREET
ANCHORAGE, ALASKA 99509
TELEPHONE (907) 278-2611
January 10, 197'8
T°:State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
8001 Porcupine Drive
Anchorage, Alaska 99'504
Attn: Mr. O. K. Gilbreth
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning'it to this office:-
1 sepia and 1 print spinner survey for the following BD operated
Wells:
H-3 (22-11-13)
E-2 (06-11-13)
E-3 (32-12-14)
.~_ E-4 (:24'31-12)
E-5 (05-11-14)
E-6 (06-11-14)
F-6 (35--12-13)
G-3 (12-11-13)
N-7 (08-11-13')
N-8 (07-11-13)
Well Records
BP ALA*'""KA INC.
P. O. BOX 4-17~%-
3111 "C" STR
ANCHORAGE, ALASKA 99509
TELEPHONE (907) 278-2611
GEN-AK-083
December 27,
TO:State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, AK 99504
Attn: Mr. O. K. Gilbreth
1977
REFERENCE:
The following material is being submitted herewith. Please acknOwledge receipt by signing a
copy of this letter and returning itto this office:-
Compensated Neutron Logs for the 1 zerox copy
%-//'-'- E- 4-~%~].- 12-14 ) 5" 'Run #1 5-28-77
N-2 (17-11-13) 5" Run #1 4-16-77
following BP operated wells:
Well Records
Colette Tracy
RECEIVED
~ 0 U '
DATE 19~
?977
Redi Kwik Printi~cJ, Anchorage
BP ALASKA INC.
TO: State of Alaska
P. O. BOX 4-1379
3111 "C"STREET
ANCHORAGE, ALASKA 99509
TELEPHONE (907) 278-2611
GEN-AK-083
December 20, 1977
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, AK 99504
Attn: Mr. O. K. Gilbreth
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
Enclosed are 1 sepia and 1 print for the following
BP operated wells:
1-12-14) TDT-K Run #1 5" ~
F- 7 ( 34-12-13 ) TDT-K Run ~ 1 5" ~/
G-1 (01-11-13)
PCT/TEMP/FBS Run # 1
G-3 (12-11-1'3)
J-8 (05-11-13)
J-9 (09-11-13)
TDT-K Run #2 5" ~/
Temperature Run #1 5" /
Temperature Run 91 5" ~J
Colette Trac~ ~-~
Well Records
RECEIVED
'Divis~ 7' and Gas ~onservaticn
O. K. 'Gilbreth, Jrt, ~ , Dec~mber 6, 1977
Director ~J~ ,
Hoyle H, I{amiltc~,
Chief Petroleum Eng/neer iv' . .
Surface Safety Valve (SSV) and
Subsurface Safety Valve (SSS V) tests
F_ 's D-I, D-3, D-6, E-l, E-2,
4, F-7, G-2 and C~3
M~nday_, November 2.1, 1977 - I departed my ksane at 7:30 AM for an 8:00 ~M
~cwup and '9-:-00" AM-~ via BP charter for Deadhorse. t~e..avy fog at
~rage International Airport delayed our departure until 9:45 AM and
we arrived in Deadhorse at 11:15 AM. On arrival at BP operations I learned
GC-1 was shut down again which would cz~plionte the .planned testing cf
SSV's and SSSV's in wells flc~ing into that gather~ center. D~ring
bek~:
.-.
Test Test Test 9 5/8"
Tubing SSV SSSV T~me Annulas
PS! @ (~) ~~~ @ (mi) ~~ts (Hr.) mm . Da~
D-1 1080
D-3 920
- ~": D-6 1400
. .-.~.. · ~ E-1 1445.
1600
;~' '?'~: 1640
.
* 450 OK 1/4 0
* 180 OK 3/4 0
* . .. 1000 OK 1/2 190
ox. 2/3 o
OK 3/4 0
OK 1/3 900
* 1130
* 1100
* 1040
* 1200
* 1050
1720 OK 1/2 680
. 1570 OK 1/2 1000
11-22-77
11-22-77
11-22-77.
11-22-77
11-22-77
11-22-77
11-23-77
11-23-77
1700 * 1000 OK 1/4 0
1350 1050 OK 975 OK 3/4 0
11-21-77
11-22-77
SSV's on these wells tested sucoess~y during period of 11-8/11-11-77
Tuesday, ~km~mber 22, 1977 - In addit/mn to HP w~lls tested, four wells cn
Arco's dr~li~'S~It~"%9 were tested and are the subject of a separate report.
_Wednes~ay,~__ November 23.~j..!977 - I de~ Deadhorse via BP dmarter at 6:25 PM,
arriving in-Anchoracje' at '7'~'45 1:~, and at my ~ at 8.15 PM.
In ~ fy: I witnessed successful SSSV tests on BP's wells D-i, D-3, D-6,
E-I, E~2,' E-4, F-4, G-2, and'G-3. SSV was successfully tested ~n well G-3.
~R,bJm
,l.,
Drlg. Permit No
Operator ,c~, ~
Alaska Oil and Gas Conservation Committee
Field Inspection Report
,?~'~$~,~ Well/P.l~a~tJfm . Sec T__R , ~l ,.
Represented by ~',' ,, ~ - Name & Number
Satisfactory Type Inspection Satisfactory. · Type Inspection Yes No Item ( ) Location,General Yes' No Item ( )BOPE Tests
( ) ( ) 1. Well Sign ( ) ( ) 15. "Casing set
( ) ( ) 2. General Housekeepin.q ( ) ( ) 16. Teac fluid-( )Wtr.---~-(-)mud.( ) oil
( ) ( ) ~. ReServe Pit-( )open( )filled ( ) ( ) 17. Master Hyd. Control Sys.- psi~
( ) ( ) 4. Rig ( ) ( ) 18. N2 btls. ,__, ,__psi.q
(.~',.,)~Safety Valve Tests ( ) ( ) 19. Remote Controls
(&,)~' ( ) 5. Surfa'ce'JNo. Wells~ ( ) ( ) 20. Drilling spool- "outlets
(~,)~ ( ) 6. Subsurface-No. Wells~ ( )' ( ) 21. Kill Line-( ) Check valve
( ) Well Tes~ Data ( ) ( ) 22. Choke Flowline ( ) HCR valve
~( ) '( ) 7. Well Nos. , , , ( ) ( ) 23. Choke Manifold No. valvs flos__
( ) ( )~ 8. Hrs. obser' , , , ( ) ( ) 24. Chokes-( )Remote( )Pos.(-~dj'
( ) ( ) 9. BS&W ,--,--, ( ) ( ) 25. Test Pluo-( )Wellhd( )csg( )none
'( ) ( ) lO. Gr. Bbls. , , , ( ) ( ) 26. Annular Preventer, psio
~ ()Final ~a~m~nt -- ( ) ( ) 27. Blind. Rams, _ psi~
~ .
~(...) ( ) ll. P&A Marker ( ) ( ) 28. Pipe Rams .psi~
~?(') ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock ~psig
. ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psio
(') ( ) 14. Pad leveled ( ) ( ) 31 Safety Floor ~alve~~BV ( )Dart
Total inspection observation time~_~,~hrs/da~.s Total number leaks and/or equiP, failures~
Remarks ~'~'~ ,~ ~ -~,'~ ..... ~,.,~ , ............. ~ .... '~ ~,.~. ,~ ·
. ,:~e~ .__ .otify in days or when ready Inspected by
Drlg. Permit No.~._
Opera tor .~,~ - ~
AlasKa Ul[ ara bas bonserva~lon
~'~ Field Inspec..,tion Report
~'~/~"~,~ Well /~'.~ .:f.m Sec T
.,
Represen ted by .~f..~m~m,,~ Name & Number
R , M
Satisfactory Type Inspection
Yes No Item ( ) Location,General
( ) ( ) "-]TWell Sign
( ) ( ) 2. General Hou.sekeepin~
'~ ( ) ( ) ~. Reserve Pit-( )open( )filled
~() ()
(~'()
(~.>~ ( )
() ()
() -()
, ()()
() ()
() ()
() ()
() ()
4. Rig
(,~,~)~Safety Va!ye Tests
5. ~-u'r~face---No.--~l~lls~ ......
6. Subsurface-No. Wells,~
( ) Well Test Data
7. W~~s. , , __,_ ~
8. Hrs. obser , , ,
9. BS&W , , ,
10. Gr. Bbls.
~ 9 9__
( ) F ina~a~m~n't
11. P&A Marker
Satisfactory Type Inspection
Yes No Item ( ),BOPE Tests
( ) ( ) 15. "Casing set ~a
( ) ()' '16. ~'es-L fluid-( )wtr.-----~ )mud ()oil
( ) ( ) 17. Master Hyd. Control Sys.- psig
( ) ()..-18. N2 btls. , ..... , ...... ,~. .psig
nt
( ) ( ) 19. Remote C-'---~o-i--s
( ) ( ) 20. Drilling spool- "outlets
( ) ( ) 21. Kill-Line-( ) C~-~-~--Valve
( ) ( ) 2.2. Choke FloWline ( ) HCR valve
( ) ( ) 23. Choke Manifold No. valvs flgs
( ) ( ) 24. Chokes-( )Remote( )Pos.(-~-A-dj.
( ) ( ) 25. Test Plug-( )Wellhd( )csg( )none
( ) (). 26. Annular Preventer.,______psi~
( ) ( ) 27. Blind Rams, ps~
( ) ( ) 28. Pipe Rams psiq
29. Kelly & KeTly-cock ~psig
30. Lower .Kelly valve psio
31 Safety Floor valve~--)-BV
12. Water well"( )capped( )plugged ( ) ( )
13. Clean-up ( ) ( )
( ) ( ) 14. Pad leveled ( ) ( ) ( )Dart
Total inspection observation time~hrs/da~ys Total number, le~r eoui~, failures ~
cc:/~]~!'~'? ~Jt}.'~w~'~N,~N°tNfy_ ~ .'_ ' in days or when ready Inspected by~2~%~C~,~-t~ Date//-~-~'~ .....
DEPArfI~ OF ~[~TU~ ~2SOURCES
O. K. Gilbreth, Jr~ ~v December 6, 1977
Director
I'
ttoyle H. Hamilton . /~.~
Petroleum Inspector
Surface Safety Valve (SSV) and
Subsurface Safety Valve (SSSV} Tests
BP's "D", "E", "F", "G". , "J" and "M" Pads
Sunday, .No~ 6, 1977 - I departed my hcm~ at 4:00 PM for a 4:30 PM showup
and 5:30' PM departure via Wien flight. #19 for Deadhorse, arriving via Fairbanks
at 8:00 PM. I proceeded to Arco's drill site ~9 for BOPE tests the follc~ing
day.
Monday, November 7, 1977 - I witnessed successful BOPE test em Arco's DS 9-18
during the afteznocm arid was picked up by Nelson Hca, BP wireline coordiDator,
at 8: 00 PM ~ az~ived at BP ,.operati~ at 8: 45 PM.
Tuesday, ~ 8 ~.Friday, ~_ 11,,197!- During this period I
witnessed sS~' and sssv teSt~ and' mCni~~' 9' 5/8' '.annular pressures on all ' , ........
wells on pads "D", "~"~.., "F". and "G" (except ~11 G-3 which was to be pulled)
that flc~ into GC-1. All w~lls _b~__d shut in automa~c~y on iow pressure pilot
when GC-1 was shut down for modification. Low pressure pilots at the ~lls
are set at 590 psi. Low pressure flowline pilot located at the c~ntrol house
is set at 625 psi.. High pressure pilots are set at 2600 psi.
Since w~ could not bleed into the flowline, a high pressure hose vms connected
to the top of the tree and pressure bled into a tank in the back of a pickup.
The wells w~re extremely gassy and m~st of the time expended in testing was
in 'bleeding the gas caps down. Testing ~ all wells was initiated by reading
the pressure 'above the SSV, bleed/ng it to zero and monit~g for any buildup
for five minutes. SSV was then ~, a tubing pressure recozOed and pressure
aboxm the SSSV bled to an easily read differential on the gauge and munitored
for five m/nutes. Annulas pressure between the tubing and 9 5/8" was recorded
during this t/me. Listed belc~ are results of these wells fl~/ng into GC-1,
plus recently perforated w~lls J-9 and M-3 which flc~ into GC-2:
Test 9 5/8"
Tubing Test SSV Test SSSV. Time
PSI @ (PSI) Besults .9. (..PS_l) B~sults L~_.~Ir..) PSI Date.
D-1
" ~D-3
D-4
;. i:. ~. 'D-5
D-6
D-7
800 0_ OK 700 Bad 3/4 0
850 0 - OK "~ .. .. 340 Bad -1 1/2 0
1400 0 OK 1050 OK 3/4 220.
1500 0 OK 1250 OK 1 0
1400 0 OK 900 Bad 1 0
1500 .0 OK 1200 OK 3/4 0
11-09-77
11-09-77
11-08-77
11-08-77
11-'11-77
11-09-77
E--1
E-2
F,--3
E-5
]~-6
F-1
F-2
F-3
F-4
F-5
F-6
F-7
F-8
G-1
G-2
G~.3
G-4
J-9
M~3
PSI
1670
1600
1600
1600
1600
1600
Test SSV
@' (PSI)
0
0
0
0
0.
0
1450 0
1600 0
1600 0
1600 0
1550 0
1575 0
1300 0
1550 0
1200
1200
1050
1250
1050
1300
OK
OK
~K
OK
CK
OK
Test 9 5/8"
Tim~ Annulas
Bad 1/2 0 11-09-77
Bad 2 0 11-09-77
Ok 1 0 11-09-77
Bad 1 0 11-09-77
OK 1/2 0 11-09-77
OK 1 15D . 11-09-77
950 OK 3/4 440 11-10-77
1250 OK 1 0 11-10-77
1250 OK ' 1 800 11-10-77
1100 Bad 1 570 11-10-77
1175 fK 1 ~5 11-11-77
1100 OK 1 0 11-11-77
800 Bad 3/4 24 11-11-77
107.5 OK 1 75 11-11-77
1600 0 OK 1200 OK 1 60 11-10-77
1550 0 OK 1160 (F, 1 0 11-10-77
(SSSV to b~ p,!1_nd- not tested)
1600 0 OK 1200 OK 1 1/4 0 11-10-77
1500 590 OK 700 OK 1 200 11-08-77
820 140 OK 320 OK 1 1/4 0 11-11-77
SSV's c~ wells D-3, D-7, F-1 and G-2 initially tested bad, but w~re lubriated
on the night of 11-10 and retested success~y on the mozning of 11-12.
SSSV failures ~are eight, or 32% of the t~en~fi~ w~lls tested.
Conclusions: Average test t/me per w~ll was 59.4 minutes under less .than
~ideal' ~tic~s. ~%e ~ w~re ex~ly gassy, having been shut in for
over 48 hours, oold .temperatures (-30° F) froze needle valves and volumes
bled through the hose w~re minJzmx~. Test/rig ~ could easily be halved
while w~lls were flowing fluid into flowl~s, and low pilot shutdown
In a meeting Saturday morn/rig, ~k~ber 12, with Ted Staggs, lead petroleun
engineer, Max Fernandez, field productic~ foreman, and Nelson Hoppe~,
wirel/ne coomS/nator, it was decided to utilize t~o w/reline units to
remove'the faulty SSSV's in wells D-l, D-3, D-6, E-l, E=2, E-4, F-4, and
F-7, replace the~ and test them before they went back on production.
Accoxdi~g to Max Fernandez, 6~2-1 was ~uled to go on stream an Wednesday,
November 16. I advised Max FexTmnde~ these wells could go c~ production
without agency witnessing, but to advise us of the test results and w~
would require a future witnessed test.
Sa~y,_ N ...o~~ _12, 1977'- I de~ Deadhorse via HP charter at 1:00 PM,
'a~iving in A~c~ at 2:~0. PM and at my ~ at 3:00 PM.
-3-
December 6, 1977
In ~ _su~: I witnessed SSV and SSSV tests cn all wells flowing into
~C-1 (except G-3 whid% was to be wor~d over), wells J-9 and M-3 flow~
into GC-2, and ~ annular pressure between the tubing and 9 5/8"
All SSV's tested successfully. F~wever, SSSV's in wells D-l, D~3, D-6,
E-l, E-2, E-4, F-4, and F-7 w~re faulty and ~ work began Saturday,
office before the wells go c~ uroducti~. State witnessing of the SSSV's
will be requested at a la~_r dat~,
North Alaska District }~gineering
f I.DENTIAL
STATE OF
To' DIVISION OF OIL ~ ~ From:
T RAN SM I T TA I,
J. A. Rochon/D. R. Jackson
Date' /Al ~g~ ~qt ,1 .~ ~ 1 977 Well Nmne'
D.S,, E-4. 1.
Transmitted herewith are the following for the subject well'
Run No. Scale
Xerox Sepia BL Line
BttC Sonic/Caliper Log
BHC Sonic/Caliper - Gamma Ray Log
...... '-' BHC Sonic/Ganmia Ray .Log
-~- 'Catiper/CCL -- - ' ....
Cement. Bond Log/VDL
~-- Conpensated Formation Dens:i.ty Log
-- CompenYated Neutron-Formation Density
,__
1 Conpensated Neutron Log
Core Analysis - Interval
Core No.
Core Description (SWC) - Interval
Core Description (Cony.) - Core No.
Directional Survey- Gyro
Single Shot
Multishot
Ih'ill Stem Test - Test No.
IMal Induction Laterolog
Fox, nation Density Log
Fo~nation Density Log/Gan~na Ray
Gamma Ray/CCL
Laterolog
Location Plat
Microlaterolog
Microlog
Mudlog - Interval
_ Sample Log (A.R. C6.')-' Interval
.... Synergetic Log
'TFD-DIL
TVD-Porosity Log
Receipt Acknowledged For:
f z 77
Please return receipt to: Atlm~tic Richfield Company
North Alaska Engineering Manager
P.O. Box 360
Anchorage, Alaska 99510
#560
BP ALASKA INC.
3111 - C - STREET · TELEPHONE (907) 279-0644
CONFIDENTIAL
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
BP well NUmber E-4 (24-31-12-14)
Enclosed, in duplicate, isForm P-7, the Completion Report on the above
well, together with the Well History. This well has been perforated
and is ready for production.
PRJ:kk
Enclosures
cc: Well File #17
Regina McGaffigan
Very truly yours,
BP ALASKA INC.
P. R. Judd
District Drilling Engineer
SUBMIT IN DUPLICATE*
STATE OF ALASKA (see other in-
st ructions on
5.AP1 NLrNI~RICAL CODE
OIL AND GAS CONSERVATION COMMITTEE
50-029-20184
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
la. TYPE OF WELL: ou, GAS ' }r-~
WELI. ~J W ELL
DRY
Other
b. TYPE OF COMPLETION:
WELl, OVER EN BACK P. ESVR. Other 8. UNIT,FAIllVI OR LE2kSE NAME
2. ~'.~E or OPERATO~ Prudhoe Bay
Unit
BP Alaska, Ing. .
3. ADDRESS OF OPERATOR
P.O. Box 4-1379, Anchorage, Alaska 99509.
4. LOC,~r~ON OF WrLL (Report location clearly and in accordance with any State requirements)*
At surface
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
At top_prod, interval reported below
219' NSL, 3249' W-EL, Sec 31, TllN, R14E, UPM
At total depth
411' NSL, 3418' WEL, Sec. 31, T12N, R14E, UPM l~..PmmIT~O.
. 75-77..
1-5-76 t 2-1-76 ! 5-30-77 KBE = 56,52' ,AI~I. SL I . 28.60' AMSL
18. TO~L DEPTH. ~LD 9. PL BJLC'K MD & TVD~0, IF 1ViULT~LE CO1VLPL., 21. INTERVALS BY
TVD [ ~owma~,~Y* ao~a~ TO0~S CA~t,i TOOLS
.. ~0195' 10141' O2An' .| Total .
22. PRODUCING INTE/RVAL(S), OF THIS COMPI2ET-IO--~f~TOP, BOTTOM, NAME (NIT) AND TVI))* 23. %VAS DIRECTIONAL
· SURVEY MADE
Top:. 9687' MD 8855' TVD
Prudhoe 0il Pool - Bottom: 9858' MD 9003' TVD ~ Yes
6. LEASE DESIGNATION A.ND SERIAL NO.
APL 28299
7, IF INDIA2W, A~LOTTEE OR TRIBE NA1VI~
9. WI~,L NO.
E-4 (24-31-12-14)
~0. FmLD AaWD POOL, OR WILDC~,T 0il
Prudhoa Rmv. Pr.dhoo Pool
n. SEC.. T., a., M.7 (~O~OM
Sec. 31, T12N, R14E, UPM
24. TXSPE ELECTRIC AND OTHEt{ LOGS RUN
Vr~./SP/¢R, V~./SP, BaCS/~R, ~C/Cm./aR, CB~./V~U/~R/CCU
~' " ' CAS~G REC:O~ (Report all strings set in well) '
C~S~4G SIZE WEIGHT, DEP~ SET (~) HOLE SIZE [ C~5iLNTING RECO~ I ~OUNT FULLED
SEE AT ~CORD
26, LINE~ ~CO~ 27. TUBING
BOTTOP5 (MD) ACKS CEMenT* I SCi%E~ (MD) SIZE DEP~ SET (MD) ~ PACKER SET (MD)
2"
28. PERFORATIONS OP~ TO PRODU~ON (interval, size and number) 29. . ACID, Si!OT, Fi%ACTURE, C~,iENT SQUEEZZ, ~C.
9687 '-9712 ' B~ 4spf0.'5" (ref. BHCS/GR, 2-1-76) Dm-~ INT~V.~ (MD) ] AMOUNt Z~D I(IND OF MA~PaAL US~
~9727'-9742' " . (. ,, )
I
9755'-9795' " ( " )
9810'-9823' " . ( ,, )
9843 ' -9858' " (-- ,,
30. PRODUCTION
.
DATE FIRST PI%ODUCTION ~ '~ODUCT10.N ~EII{O'D (FlowiDg, gas lif~, puInp~g--size and type of pump) V¢'ELL STATUS (Producing or
DAT~ OF TEST, EOURS TEST~ *]CItOSiE SIZE [PROD'M FOR OI~BEL. GA~MCF. VgATE~BBL. [ GAS-OIL ILkTIO
~ : [ [TEST PZ~!OD
~V.~UBING CAShNG PRESSURE [CAL~TD OI~BBL. GA~-~CF. WA~BBL. [OIL GRAVITY-~I (CO~.)
t~SS. ,[24-~OUR, RA~
"" I 1
31. DISPOSITION OF OaS (80l'~ u~ed ]or Iuel, vented, etc.) "
I TEST W ITNESS~D
32. LIST O~'"ATTACHMENTS '
Well Htstory, ~Casing Record
33. I hereby certify that the foregoi~attached information Is complete aha correct as determined from alI~v&ilable ~eords
SIGNED : ~ . _ _ ~ . _ . _
i iii II
:*(S~ In~mcfio.~ ~.~ Sp~c~ for Addifio.~l D~lo o. R~n~ Sid,)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report end tog on
all types of lanJs and leases in Alaska.
Item: 16: Indicate which elevation is used as referenc'e (where not otherwise shown) for depth measure-
ments given in ether spaces on this forr'n and in any attachments.
Items 20, and 22:: If this well is completed for separatc, production from more than' one interval zone
(multiple completion), so state in item 20, and in item 22 show the p~cJucir~g ·.interval, or intervals,
top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report
(page) on this form, adequately identified, for each additional interval to be seperately produce'J, show-
ing the adiditional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced. ,.r ~
(See instruction for items 20 and 22 above). ~ ~
..
,,,
34. SUMMAt~Y.OF FORMATION TESTS INCLUDIN(; INT'ERVAL TESTED, PHESSURE DATA ~ RECOVERLES OF OIL. GAS,
35. GEOLOGIC M ARK~S
WATF-Ar~ AND MUD
NAME
M£AS. r>gP'n~ r'"~u~ vrr~T..~.~
BKB Sub s aa
Sag River 9419' 8572'
Shub 1 ik 9478 ' 8621 '
Ivishak 9561' 8691 '
3~. ~.H,E DATA. Aq'I'ACI~ '~ :~~3~S ~F ~ITI.tO~OG¥, "'POH:O~Y. '~R.A:~, ~P,P.~ ~ ~ ~
· ~,o :~Ela 'Snows 'OF o~b, .G~S '~ '~v~. . .
..
..
,
;.. _.~
..
.
.
..
, , , ,~ .........
BP WELL E-4 (24-31-12-14)
CASING RECORD
Casing Size
Weight ilb/ft
Grade
Depth Set (MD)
Hole Size
Cementing Record
Amount
Pulled
20"
13 3/8"
9 5/8"
9 5/8"
94#
72#
47#
47#
H-40 104' 26" 100sks
N-80 2840' 18 1/2" 4260 sks
N-80 2104-9131' 12 1/4" 1431 sks
N-80 2113' to surface with top 3 its. 9,5/8"xll 3/4"
Thermocase II
7" 29# N-80 8611-10195 8 1/2" 593 sks
WELL HISTORY
BP Well Number E-4 (24-31-12-14)
DRILLING
~anuary, 1976
Accepted rig 2400 hrs., January 5, 1976. Drilled 18-1/2" hole to 2850'. Ran 73 jts.
13-3/8" 72# N-80 Buttress casing with shoe. at 2840'. Cemented with 4260 sks. Per-
mafrost cement. Nippled up and tested BOPE. Cleaned out to 2865', ran leak-off test.
Directionally drilled 12-1/4" hole to 9155'. Ran multishot survey. Ran Schlumberger
open hole logs. Ran 177 jts. 9-5/8" 47# N-80 Buttress casing with shoe at 9131', PBR
at 2104'. Cemented with 931 sks. cement. Cemented lap through F.O. at 2844' with
250 sks. Permafrost C cement. Tested lap - failed. Squeezed lap with 250 sks.
Permafrost C cement. Tested lap to 3000 psi.
Drilled out shoe and pressure tested to 0.7 psi/ft. Directionally drilled 8-1/2"
hole to 9945'. Cut 2 cores to 10,043', recovering 95'. Drilled to 10,195' , ran
multishot survey. Ran Schlumberger open. hole logs.
Ran 37 its. 7" 29# N-80 Buttress casing with shoe at 10,195', PBR.at 8,611'. Cement-
ed with 593 sks. Class G cement. Cleaned out to 10,141', tested lap to 3000 psi.
Ran inflow test with 3580 ft. mud cushion. Displaced top 2500' to diesel. Nippled
down BOPE, installed and tested tree. Released rig at 2400 hrs., February 6, 1976.
COMPLETION
Rig accepted 0600 hrs., April 7, 1976.. Nippled up and tested B.O.P.E. Dressed
9-5/8" PBR from 2105' to 2117'. Ran 9-5/8" 47# controlled yield N-80 Buttress casing
tie-back string with .120'~ of 9-5/8" x 11-3/4" Thermocase II on toP. Stabbed into
PBR and landed in casing head. Nippled up and tested 13-5/8" 5000# tubing spool.
Tested B.O.P.E. RIH to 2844' found F.O.C. open; closed F.O.C. and tested. Displace
13-3/8" x 9-5/8" annulus to Arctic Pack through F.O.C. at 2057'. Made cleanout run
to 10135' and displaced well over to diesel. Lost 6"'bit in hole on trip out; re-
covered bit from top of 7" PBR at 8611' using Schlumberger magnet. Dressed 7" PBR
from 8611' to 8651'. Ran 7" 26# controlled yield N-80 Atlas Bradford TC-4S tubing
with subsurface safety valve nipple at 1968'. Stabbed into 7" PBR to 8646' and
landed in tubing spool. Nippled down B.O.P.E., nippled up and tested Xmas tree.
Ran gauge to bottom. Set blanking sleeve in safety valve nipple. Released rig at
2400 hours, April 12, 1976.
PERFORATING - May.~ i977
Ran cased hole neutron log. Perforated the following intervals at 4 S.P.F. using
Schlumberger 4" Hyper-jet II 90° phasing:
9687-9712 ft. BKB (ref. BHCS/GR 2/1/76)
9727-9742 " ( " )
9755-9795 " ( " )
9810-9823 " ( " )
9843-9858 " ( " )
PB Well Number E-4 (24-31-12-14) 'cont.
June, 1977
Ran and set insert sleeve. Ran and set downhole safety valve. Ran pressure/tempera-
ture survey, ran pressure/temperature survey.. Tested downhole safety valve, swab
valve, master valve. Test witnessed by state representative. End of Operations. The
well was left with the downhole safety valve closed and with the wellhead ~alves closed
(except the surface safety valves.)
SI'ATE
of ALASKA
DEPARI~.~NT OF NAHTHtAL RESOURCES
Divisic~ of Oil and Gas Conservatio~
TO: ~
FROM:
O. K. Gilbreth, Jr.
Director
· H, Hamilton .
~C~ Petroleum Engin~w .'
DATE
SUBJECT:
July 7, 1977
Subsurface Safety Valve and Surface
Controlled Safe,~alve Tests on
BP's G-2, D-3~ E-2;
Seal ~%ree Valves 'at Arco's (IYfU
Saturday, _J~u!e' !1.,. 1977 - I departed my hcme at 7:30 AM fo= an 8:00 AM
~ and 9:00-'A~4 departure via BP charter for Deadhorse, arriving there
at 10:30 A~. I proceeded to.Arco's DS 5-8 where BOPE t~sts ~ initiated.
~, Jun~... 12,_ 1977.- BOPE tests on. Arco's DS 5-8 ccmc.~uded.
. .a ne_ 77- sssv scsv on: Ar o's
m~"~ ~u~ %a~-p~ to "G" pad for testtn~ SSSV and SCSV at well G-2.
We were accompanied by Ted Stagg, Assistant Production Operator.
Tests began at 9:10 .AM with-the SSsv, set at 2128', open and shut in
tub~ pressure 1500 psig. 5he SSSV was then closed and pressure above
th~ SSSV bled to 750 psig and monitored for five minutes. SSSV was tb~n
reopened and SCSV closed and.., pressure downstream bled to 640 psig and
moni~ for five minutes. ~Tests were ~uded at 10:50 AM.
We the~ p~oceeded to w~ll D-3 wh~re tests began at 11:15 AM with the SSSV
open and shut in tubing pressure of 130'0 psig. SCSV was then closed and
pressure downstream of th~ SCSV bled to 660. psig and monitored for five
minutes. SCSV was then opened and S~%V, set at 2008', was closed and
pres~e 'above tl~ ~ bled to 700 psig and monitored for five minutes.
Tests u~re coacl~ at 11:35 A~L
We then proceeded to. "E" pad %~_re tests on well E-4 began at 12:55 PM.
The SCSV was closed on arrival and c~ open/rig the master valv~ and SSSV,
set at 1975', shut in tubing pressure was 1500 psig. We mcnit~red the
pressure downstream of the SCSV for five minutes and then op~ned the SCSV
and closed the SSSV. Pressure above the SSSV was bled to 1000 psig and
mo~i~ for five minutes. Tests were cc~cl~ at 1:30 PM.
Tests on E-2 began at 1:40 ~4 with the SCSV already closed, the F~V and
master valve open, and a shut in tubin~ pressure of 1250 psig. SSSV was
t~hn closed and pressure bled to 475 p~i~ and mo~itox~d for five minutes.
Tests were c~%cl~ at 2:00~pM.
BP' S G-2, D-3, E-4, E-2
Arco' s COTU
-2- July 7, 1977
Field Inspection Reports w~re prepared with the ~rigi~als given to Nelsc~
Hopper, copies given to Ted Stagg and copies attached to this report.
I .then cc~~ Ken Svetc, Arco's OUIU F~, who advised three valves
rec~!~ed-sealing. I arrived at COTU at 3:40 PM and s~aled t~o valves
downstream of the'~ pump at COT-2 az'zl' one valve ~eam of 't.tme
charge FamP at COT-1.
I then proceeded to drill site %9 fc~ upoc~r~ BOPE test ~n DS 9-13.
Shortly after arrival there I learned rig peril w~re enroute to
~ Station No. 1 to pick up Harold Hawkins. O~ his arrival it was agreed
he ~ould ~ th~ test. By that time it was too late to catch the
Alyeska charter and there was no space avaLlable c~ wien ~r the late ~P
charter.
Wednesday,._ June 15,~ _.1977 -I de~ Deadhor~ at 2:30 PM via ~P charter
~.arriv~ at A~d~ag~ at 4:00 PM and .at my hcme at 4:30 PM.
~ _~: I witnessed successful SSSV and SCSV .tests c~ HP's G-2,
D~3, E-4, E-2. I also sealed three valves at Arco's COTU.
At~t
· Ala and Gas .conSe
T - i' ("-) '( 21::~:-'K~i!? Line.~ :k
.~: ~- . :.~-? (_) (.)-/_?.'22,.ChO. ke..Flowl
:~.:'-' (-:') ('.)~:-".:.'8 ?i,'i.-"'.:', .--iT,_' '-(.) ( ):_'~. 2~'~..-.Ch6keSZ( )R
-": ('.)'.'(-) '-9L~:BS&W.'~.-.~-:~.,...~:.,:'~]..:. ':ii~--'~-~_~'~..:- .:: '( ) ( } ~"-26'. Test Pl'u?(.i~'~)Wel-}hd( )csg~
...... ( ) ~-( ) '~ io~':"Gr..".' B-b~'-'~:'-~-'---- -~ ':'-'~ -( ) ( ) :' '26'. Annular'. PreVenter~_____Psip'
· ~ ( .)..Final Abandonment ( ) ( )_. 27. Blind Rams,~psi.n
( ) .( ')- l l. P&A Marker ( ) (.) 28'. Pipe Rams psiq
'(') ( ) 12-: Water welt-( )c. appe-~l( )plugged ( ) ( ) '29. Kelly & Kelly-cock'__.__]psi'g -,'.-
( ) ( ) 1.3. Clean-up ~ ( ) ( ) 30. Lower Kelly valve 'psi.o.
( ) '( )_ 14. Pad leVeled.. . ' ( ) ( ) 31 Safety Floor valves-~(-")-BV ( )Dart
Total inspection observation ti.meyJl~ hrs/d~l~]~ Total number leaks and/or equip, fai.lures
Remarks -- _ .
~~v.~- ~
cc:~. ~:~~.. Notify in da~S 'or when ready. Inspected by~;
... .... - .- ~ ..... '.. ..... ~:.'.~.....-..~_?~......~ .'~ :.:~ ~ .: '..- -~.:..' .. .... - -..~. ~ .~./..~...-.:':(".?-?..:..~ - ~;~.....- ..
· BP ALASKA INC.
31 1 I - C - STREET · TELEPHONE (907) 279-O644
CONFIDENTIAL
Mr. Hoyle H. Hamilton
Director
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
MAILING ADDRESS:
P.O, [lOX 4- 12Z.O
ANCHORAGE. ALASKA 99509
July 1, 1977
Dear Sir:
Mundry Notices and Monthly Reports:
Wells:~4-06-11-14)
41-32-12-14)
'24-31-12-14)
23-05-11-14)
E-6 (33-06-11-14)
N-5 (34-06-11-13)
N-8 (33-07-11-13)
D-3 (23-14-11-13) '
G-2 (22-07-11-14)
H-4 (32-15-11-13)
H-5 (12-16-11-13)
We enclose the subsequent Reports and Monthly Notices for work performed during
the recent perforating activities in the above referenced wells.
BED/ew
Enclosures
Very truly yours,
BP ALASKA INC.
B.E. Day±es
District Petroleum Engineer
for BP Alaska Inc.
Form 10-403
REV. 1-10-~73
Submit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
1. OW~LL:~WELLGAS D OTHER
2. NAME OF OPERATOR
BP ALASKA INC.
3. ADDRESS OF OPERATOR
P. O. Box 4-1379, Anchorage, AK 99509
4. LOCATION OF WELL
At surface
1153' SNL, 502' W-EL, SEC.6, TllN, R14E
13. ELEVATIONS (Show whether I~F, RT, GR, etc.)
KB=5652' AMSL; BF=28.60'AMSL
14.
CheCk Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
PRUDHOE BAY
9. WELL NO.
E-4 (24-31-12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
SEC. 31,T12N,R14E, UPM
12. PERMIT NO.
70.75
3oft, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT~.~ ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
The following intervals in this well, were perforated on May 30., 19.77~ th.~ ,,~sh%~ density
9687-9712 ft,. BKB (ref. BHCS/GR 2/1/76)
9727-9742 " ( . " )
9755-9795 " ( " )
9810-9823 " (: " )
9843-9858 " ( . " )
Prior to perforating ran a cased hole neutron log. .After perforating ran and set SSSV
in insert sleeve at 1968' BKB. Ran static bottom ~hole pressure and temperature survey.
The sub-surface safety valve was closure tested on June 15, 1977. The test was witnessed
by a state representative.
16. I hereby certify that the foregoing is true and correct
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY.-
T IT LE DATE
See Instructions On Reverse Side
~Fc)rm ~o.
~, ~- I-?0
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
OTHER
0IL ~ GAB ~
WKLL W~LL
2. NAME OF OP~ATOR
BP ALASKA INC.
· 8. AD~kES$ OF OPEP.~tTOR
P. O. Box 4-1379~ Anchorage. AK 99509
4. I.,OCATiON OF W~T-T-
l153'SNL, 502'WEL, SEC.6, TllN, R14E
SUBMIT IN DUP. LICATI!:
5 AP1 NLFA~[ERICA. L CODE
50-029-20184
6 T.EASE DESIGNATION AND SERIAL NO.
ADL 28299
IF INDIAI,~, ALO'i rlsl~ OR TRIBE NAME
8. L~,'IT F.~RIVl OR LEASE NAME
pplln~a~.
9 W~T.T. NO
~-A /gA-q1-1 9-1
Prudhoe
11 SgC , T.. R.. ~{. (~OM HO~
SEC. 31~T12N~Ri~E~
12 P~IT NO
70-75
REPORT TOTAL DEPTH AT END OF MONTH. CI-IJ~NGF~ IN HOLE SIZE, CASING AND CEMF-,1N'riNG JOBS INCLUDING DEPTH
SET AN~) VOLUMES USED. PERFORATIONSi TESTS AlqqD RESULTS FISHING JOB~ Jbq~K LN HOLE AND SIDE-TRACKED HOLE
A2~D AI~Y OTHER SIGNIFICANT CliANG~S IN HOLI~ CONDITIONS
PERFORATING AND ASSOCIATED OPERATIONS-.- May/June, 1977
28 May 77
30 May 77
Ran cased hole
Perforated the
II 90° phasing
neutron log.
following intervals at 4 S.P.F. using Schlumberger 4" Hyper-je
9687-9712 ft. BKB (ref. BHCS/GR 2/1/76)
9727-9742 " ( " )
9755-9795 . " ( " )
9810-9823 " ( " )
9843-9858 " ( " )
4 June 77
Ran and set insert sleeve. Ran and set downhole safety valve.
7'June 77
Ran pressure/temperature survey.
13 June 77 Ran pressure/temperature survey.
15 June 77
Tested downhole safety valve, swabvalve, master valve. Test
witnessed by state representative.~ End of Operations. The well
was left with the downhole safety valve closed and with the wellhead
· valves closed:(except the surface safety valves.)
14. I hereby certify that the foregoing is true and correct
_
oil and gas conservat~ofl committee bythe 15th of the succeeding month, u~leso otherwise directed,
AtlanticRichfieldCompany North Amcric~?n Produci,g Division
North Al~s',~ istrict
Post Of rico ?~,?.~.,'~'~ ~,
Telephono ~07 277 56~7
April 28, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of'Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Subje :~~24-32-12-14)
24-31-12-14)
Dear Sir:
Enclosed please find the Well Completion Report
with attached Completion History for the above
mentioned wells.
Very truly yours,
C. R. ~KnoWles
District Drilling, Engineer
CRK:jl
Enclosures
.- ......... SUBMIT IN v? /A'I~ *
STATE OF ALASKA (Seeo:h~r
st ructions on
OIL AND GAS CONSERVATION coMMITTEE .... erse si,te,~ ~' API N~~ CODE
. 50-029-20184
i i' i i
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
ii i i
la. TYPE OF WELL: '" On'~W~:LL ~' ~SW~L~ ~ V~r ~ other
b. TYPE OF COMPLE~ON:
WELL
:. ~ o~ ow~ro~ ~ Prudhoe Bay
Atlantic Richfield Company 9. w~o.
a.-,~v~zss '~' o,~,~o~ ..................... E-4 (24-31-12-14)
10. F~ ~D POOL, OR WI~CAT
~ P.O. Box'360~ Anchorade~ Alaska 99510
4. ~.oc~.r~o~ o~- w~ (~po~ ~oc~uo, o~e~ ~,~ i, ~cco~d~,ce ~ ~ ~e ~eq,~nU)' Prudhoe Bay, Prudhoe Oil
at su~ace 1153'S~, 502'~L, Sec. 6, TllN, ~.4E, UPM
At top prod. interval reported below Top Sag RSST
lll'NSL, 3155'WEL, Sec. 31, T12N, R14E, UPM
At total dep~
12. P~IT
411'NSL, 3418'WEL, Sec. 31, T12N, R14E' UPM 75-70
l~7'~;~l-~:O~.llt;~'D%T~ T.D.-R~C~D [!5.' 'DA~ C0,~-susP o~ ABAS. ]1~.' ~EV'~{IONS (DF, RKB, RT, GR, ~)* [17. E~V. CASINGHEAD
10195' 9294' ~ 10141' 9248' ~ ~one ·
~. P~ODUCING !~VAL(S), QF ~I~ COMP~TIO~TO,P, ~O~OM, NA~ (~ AND ~)* ,2~'. WAS DI~IO.NAL
~ SU~VE~ ~AD~
. ,
None
2~. TS~ E~CT~IC AND OTH~ ~OGM' ~UN
6. LEASE DF-.S~GNATION AND SERIAL NO.
,ADL 28299
11. SEC., T., 1~., M., (BOTTOM HOLE Pool
OI~JECTIVE)
Sec. 31, T12N, R14E, UPM
None
i
9'-5/8" 47tt . ' ! N:80 [2117'
9~5/8"X11-3/4',, ThermOCase II . i54' to. sur
26. LINER I~E C O~O
SIZD TOP (MD)
t
28. PErFOrATiONS OP~ TO P~O~ O~ (interval, s~ze and number)
None
CASING RECORD ('Report all strings set in well)
HOLE SIZE
:ace
30. :~ PI~ODUCTIO
CEMLNTING RECOtLD A~.iOUNT PULLED
SCi%EEN (MD) J SIZE [' DEPTH SET (MD) I PACKE~ SE~ (~D~
i
',, i!i% , .
DATE FIRST PI%ODUCTION [ PI%oDucTIO.N MEi[{O'D (Flowii*g, gas lif~, pumping--size and type of pump)
DATE. OF TEST. tiO URS TESTED'[[CIiOXE SiZE [TES;I~~TPROD'N FOR
~O~V, TUBING CAS~G P~SS~R~ iCALC~T~ OI~BBL. GAte, CF.
l
'~'~- ms~osn'ms or o~s (8ol'~', u,e~ for lue~, ventea, etc.)
32. LIST OF ATTACHMENTS
.... [W~LI~'SGATU$ (:Producing or
~nuL-in)
[ WATE~BBL. [GAS-OIL I%~%TI0
TEST WITNESSED BY
Well Hist.ory
33. I hereby- certify that the fpregoing}nd attached information is complete and correct as determined from"all-~Gailable records
....... -.-' ,: ..... '(7
*(See Instructions and Spaces I:or Additional Data 0-n Reverse Side)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lanJs and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
ments given in cther spaces on this form and in any attachments.
Items 20, and 22:: If this well is completed for separatc preduction from more than one interval zone
(multiple completion), so state in item 20, and in item 22 show the p, cJucing interval, or intervals,
top(s), bottom(s) and name (s) (if any) for only the interval reported in ite~ 30. Submit a separate report
(page) on this form, adequately identified, for each additional interval to be seperately produce~, show-
ing the acfditional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items· 20 and 22 above). .,;<' "
,.
' 34. SUMMAH. Y OF' FORMATION TF-~'I'S INi.:LUDIN(; INTERVAL TESTED, PHESSURE DATA ~ ~COVERI~ OF OIL, GA'S.
35. G~GIC MARK~
WAT~ AND MUD
.
3~. CO~E DATA, Aq'I'ACI'[ BH1E~". D~~'O.~S
AND" D~.I~ECTED~
~ -
.
..,,
Well E-4 (24-31-12-14)
Completion History
Rig accepted 0600 hrs, April 7, 1976. Nippled up and tested B.O.P.E. Dressed
9-5/8" PBR frOm 2.105' to 2117'. Ran 9-5/8" 47# controlled yield N-80 Buttress
casing tie-back string with 120'+ of 9-5/8" x 11-3/4" Thermocase II on top.
Stabbed into PBR and landed in casing head. Nippled up and tested 13-5/8"
5000# tubing spool. Tested B.O.P.E. RIH to 2844' found F.O.C. open; closed
F.O.C. and tested. Displace 13-3/8" x 9-5/8" annulus to Arctic Pack through
F.O.C. at 2057'. Made cleanout run .to 10135' and displaced well over to diesel.
Lost 6" bit in hole on trip out; recovered bit from top of 7" PBR at 8611'
using Schlumberger magnet. Dressed 7" PBR from 8611' to 8651'. Ran 7" 26#
controlled yield N-80 Atlas Bradford TC-4S tubing with subsurface safety valve
nipple at 1968'. Stabbed into 7" PBR to 8646' and landed in tubing spool.
Nippled down B.O.P.E., nippled up and tested Xmas tree. Ran gauge to bottom'
Set ~.;Bi~nkin~g sleeveinsafety valve nipple. Released rig at 2400 hours,
April 12, 1976
AtlanC~RichfieldCompany
.-
N~orth
Ameri,,,,~-a Producing Division
North Alaska,. ,strict
Post Office Box 360
Anchorago, Alaska 995f0
Telephone 907 277 5637
April 5, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Subject'
E-1 (24-32-12-14)
E-2 (34-06-11-14)
E-3 (41-32-12-14)
E-4 /24-31-1~ 14t
E-5 23-05-1 -14
Dear Si r'
Enclosed please fi nd Sundry Notices describing
a change in the size of the tieback string for
the above-mentioned wells.
Very truly yours,
R. ,-~'~no%l~ s
District Drilling Engineer
/cs
Enclosures
A i{ 6 1976
DIVISION OF OIL AND GAS
Fon~l 0-403
REV. 1-10-73
Subml t ';I ntentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deel~ert
Use "APPLICATION FOR PERMIT---" for such proposals.)
1. O,L t-71 GAs r"']
WELLL.6J WELL OTHER
NAME OF OPERATOR
Atlantic Richfield Company
ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
At surface
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KB 56.52' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re]
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay
9. WELL NO.
E-4 (24-31-12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
)orr, or Other Data
NOTICE OF INTENTION TO.'
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR AClDIZE
REPA! R WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF~
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR AClDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or RecomDletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
...
We intend to change the size of the tieback string from 10 3/4" casing to 9 5/8" casing.
The revised completion program should read:
1. Run 9 5/8" controlled-yield N-80 Buttress casing with three joints of 9 5/8" x
11 3/4" Thermocase on top, and stab into 9 5/8" PBR at 2104'.
2. Place Arctic-Pak in 9 5/8 x 13 3/8" annulus through F. O. cementer at 2064' +.
The remainder of our proposed completion program is unchanged from that submitted via
Sundry Notice dated March 11, 1976.
1976
DIVISION OF OIL AND GAS
A~4CHO~AC-,~
hereby certify that the foregoing is true and correct
(T his space f°r St ate ~'~mi~)- ~,
CONDITIONS OF ?~ROVAL, IF ANY.-
See Instructions On Reverse Side
DATE
Approved Copy
.- Returned
State Of Alaska
Division of Oil & Gas
Attn: Mr. T. Marshall
3001 Porcupine Dr.
To: Anchorage, Ak.
Atlantic Richfield Company
North Alaska District
TRANSMITTAL
From: R.A. McIntosh - North Geological
Date: 3/30/76 We,ll Name: E-4
Transmitted herewith are the following for the subject well:
Rurl No.
Scale Xerox Sepia Bi Line
BHC Sonic/Caliper Log
BHC Sonic/Caliper-Gamma Ray Log
BHC Sonic-Gamma Ray Neutron
Cement Bond Log
Continuous Dipmeter (HPD)
Continuous Dipmeter Polliwog Plot
Continuous Dipmeter Printout
Core Analysis Interval
Core No.
Core Description (SWC) Interval
Core Description (Cony) Core No,
Directional Log
Drill Stem Test - Test No.
Dual Induction Laterolog
Compensated Formation Density
Compensated Neutron Formation Density
Gamma Ray-Neutron
Microlog
Mudlog Interval
Proximity-Microlo g/Caliper Log
Sample Log (ARCO) Interval
Sidewall Neutron Porosity
Samples (SWC) Interval
No. Boxes
Samples (Conv) Core No.
No. Boxes
Samples (Dry) Interval
No. Boxes
Samples (Wet) Interval
No. Boxes
Synergetic Log .
Samples Core Chips 9945'-10042' 2 boxes
Return receipt to: At. tic Richfield Company
North Alaska District
Attn: District Geologist Processed by: _ .
P.O. Box 360 /~_
Anchorage, Alaska 99510
ATLANTIC RICP~FIELI) CO~'~PAN¥ "'"
To'
DISTRIBUTED TO, T R A N S ']~I I T T A L
STATE OF ALASKA
DIVISION OF OIL ~ GAS
_ t..~rom: ,]'. A. Rocl~.on./~g. '.l'ol.i.vcr
])ate' March 26,515)7(5
We].]. Name' Arco I'!c:].l E---4 (5'I.-12-].4)
Trm~smitted herm¢i'th are the following for the subject'well:
Run No. Scale Xerox Sepia
BHC Sonic/Caliper Log
B}IC Sonic/Caliper -.Gan~:a Ray Log
.1. BHC Sonic - Ganma Ray Log
/ Cement Bond Lo&VI)L
__/
1 Compe'ns~ ted Formation Density Log
]. Compensated Neutron-Formation Density
Core Analysis - Interval ..........
_
Core No.
Core Description (,~VC) -- Interval
Core Description (Cony.) - Core No.
Directional Su'rv'ey - Gyro'
Single Shot
~ltiSkot
Drill Stem Test - Test No.
.1, ~ Dual Induction Laterol. og
Fm~nation Density Log
Formation Density Log - Gamma Ray
Gan~na Ray- ~CL.~~'. ,-.-:.
Laterolog
Location Plat
Nicrolaterolog
l%crolog
5Mdlog- In'terval
Sample Log (A.R.Co.-~ - Interval
Synergetic Log
BL Line
Receipt Acknowledged For:
Please return receipt to: Atlantic Richfield Compan,/
North Alaska District Engineer
P.O. Box 360
ga~chorage, Alaska 99510
. AtlEnticRichfieldCompany
North American Producing Division
NOrth AlZ'~"~ District
Post OfficeBox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
March 25, 1977
Mr. Hoyle Hamilton
State of Alaska
Department of Natural Resources
Division of Oil and. Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject ~( 41-32-12-14 )
C'~ .D~ill _Si. ts E,_~24-31-12-14)
b~ill s±~ 'E'5 (22-05-11-14)
Permit No. 75-65
Permit No. 75-70
Permit No. 76-15
2 GFOL'.
....... DR.'%Fl'
CONFER:
FILE:
Enclosed please find a Sundry Notice outlining our plans for
the above-mentioned well.
Very truly yours,
Frank M. Brown
District Drilling Engineer
/vp
Enclosure
[<iiCEIVED
MAR 2 9
Division of Oi! a;~,'J 6~:s Con~rwtion
Form 10-403
REV, 1-10-73
Submit "1 ntentions" in Triplicate
& "Subsequent Reports" in Duplicate
.TRI C TLY
~% ON F I DENT I AL
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
1. '
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drilt or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
WELL L...J OTHER
'NAME OF OPERATOR
Atlantic Richfield Co.
3.~ADDRESS OF OPERATOR
P.O. Box 360, Anchorage, Alaska 99510
g.~i':L~6C'ATION OF WELL
At su cf ace
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
13. ELEVATIONS (Show whether OF, RT, GR, etc.)
KB = 56.52' AMSL; BF = 28.60' AMSL
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay
9. WELL NO.
E-..4 ..(24-31-12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Ba~, Prudhoe Oil_ Pool
11. SEC., T., R., ~1., (BOTTOM HOLE OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO,
75-70
)oct, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF g--.J PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT {:~R.3~3C]~J30~ , ABAN DON*
REPAIR WELL CHANGE PLANS
_ _.
(Other)
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
5HOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
I'5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
The following intervals in this well will be perforated (at 4 spf) for production:
9687- 9712 ft. BKB (ref. BHCS/GR 2/01/76)
9727 - 9742 " ( " )
9755 - 9795 " ( " )
9810- 9823 " ( " )
9843 - 9858 " ( " )
Immediately following the perforation operations, the reservior pressure will be
measured. The well will be left with a SSSV in the ni/le at approximately 2000
ft. BKB.
RECEIVED
MAR 2 9 1977
t-6. I :hereby certify that the foregoing is true and correct
Division of Oil and Cas Conservation
Anchor~o
DATE,.
(This' space for State office use)
~:A~,PROV ED By ~..~. ~j~j~ ~~ Petroleum Engineer
· - . _ , TITLE
coNDITIONS OF APPROVAL, IF AI~:
See Instructions On .Reverse Side
DATE 3'30--77
.
/eumed
AtlanticRichfieldCompany
North American producing Division
North 'Ala sk/'"~"~strict
poSt Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
March lO, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
· Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
RE' E-1 (24-32-1 2-1 4)
E-2 (34-06-11-14)
. ~(41-32-1 2-14)
(24-31-12-14)
E-5 (23-05-11-14)
Dear Si r:
Enclosed please find Sundry Notices describing
our proposal to complete the above mentioned wells.
Very truly yours, -
C. R. Knowles
District Drilling Engineer
CRK'cs
Enclosures
Fcarm ! 0-403 /,~ Subml t "1 ntentions" In Triplicate ~
REV. 1-10-73 &-"Subsequent Reports" in Duplicate 0 N ~ I m ~ S T I m m
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
~' o,L ~ GAS r,J
WELL ~L~J WELL OTHER
2. NAME OF OPERATOR
Atlantic Richfield Company
3. ADDRESS OF OPERATOR
P, 0, Bo× 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
At surface
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM.
13. ELEVATIONS (Show whether DF, RT, GR, et~)
KBE 56.52' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
AD~. 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay
9. WELL NO.
E-4 (24-31-12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec, 31, T12N, R14E, UPH
12. PERMIT NO.
75-70
sort, or Other Data
NOTICE OF INTENTION
TEST WATER SHUT-OFF L--~
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other) COMPLETE
PULL OR ALTER CASING L.__.J
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR AClDIZING ABANDONMENT*
(Other) '
_
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
[5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
We propose to re-enter this well approximately April 7, 1976 to complete the well in
preparation for production from the Prudhoe Oil Pool, as per the following program:
1. Run 10-3/4" 55.5# N-80 casing with three joints of 9-5/8". x 11-3/4" Thermocase on
top, and stab into 9-5/8" PBR at 2104'.
2. Place Arctic Pak in 10-3/4" x 13-3/8" annulus through F.O. cementer at 2064'±.
3. Displace well to diesel from PBTD to surface.
4. Run 7" 26# N-80 tubing and stab into 7" liner PBR at 8611'. A subsurface safety
valve, with dual control lines, will be placed at 2000'±.
5. Install and test Xmas tree.
6. Suspend well for perforating subsequent to rig release. D~t~i.~s.~f proposed
perforations to be submitted on Sundry Notice to follow. ~:."~'
3.6. I hereby certify that the foregoing is true and correct
(This space for State office use)
APPROVEDBY~,--(~'f~ -~~..._TITLE
CONDITIONS OP~J~.PPRO~/~L, IF ANYt
See Instructions On Reverse Side
: R~tumed
AtlanticRichfieldCompany
North Amet~""~'3 Producing Division
North Alasl~. _~istrict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
March 2, 1976
Mr. O. K. Gilbreth
state of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Dri~ve
Anchorage, AK 99501
RE' E-4 (24-31-12-14)
Permit No. 75-70
Dear Sir'
Enclosed please find the Well Completion Report
with attached Drilling History and Directional
Surveys for the above-mentioned well.
Very truly yours,
C. R. Knowles
District Drilling Engineer
CRK'cs
Enclosure
OiL AND GAS
SUBMIT IN
STATE OF ALASKA (See other in-[.
st ructions on.
-- . ! 5 AP1 N~~ CODE
GAS CONSERVATION COMMITTEE
50 02~ 20~8~
[ ~. L~E D~GNA~ON ~D SER~ NO
.... ""~ ~ /~lO [Prudhoe Bay
2. NAME OF OPERATOR
~-~4-31-12-14)
10. FIELD A~ID POOL, OR WILDCAT
Prudhoe Ba¥~ Prudhoe 0il.
11. SEC., T., R,, M., (BOTTOM HOT.~E Pool
OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PEI~IIT NO.
411' NSL, 3418' WEL, Sec. 31, T12N, R14E, UPM
75-70
2-1-76 2-6-76 KBE = 56.52' AM~Li_~/J BFE = 28.60' AMSL·
Atlantic Richfield Company Ol~_~!O?} ~ ....
A~DRESS or OP~,ATOR ........ ~um~.~ ~~'- ~ AN~ OA~'
P. 0. Box 360, ~chorage, ~aska 99510 ~-,~'~c~
LOCATION OF WELL-(Report Ioc~tio~.cl6~rl~ ~d i~ ~ccord~c~ ~i~A ~y ~ requirements)*
At su~ace 1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
top Sag RSST
At top prod. interval reported below
111' NSL, 3155' ~L, Sec. 31, T12N, R14E, UPM
At total dep~
13. D.~T~ SPUDDED
1-5-76
~z~OW I~Y* ROTARY TOOLS
10,195' 9,294' [10~141' 9~248'. All
22. PRODUCING INTERVAL(S), OF ~IIS COMPLETION---TOP, BOTTOM, NAiVIE (MI} AND TV~)*
INTERVALS DRILLED BY
CABLE TOOLS
23. WA~ DIRECTIONAL
SURVE~ MADE
Yes
None
24' ~Cl~E ELECTRIC ~ND OTHER LO(}S RUN DIL/SP/OR, 2834''-9129'. DIL/SP, 9119'-10,177'. BHCS/OR,
8300' - 10,176'. :FDC]C~/GR~ 9119' - 10~158'. CBL/~L/GR/CCL, 8648' - 10,112'
CAS~G RE~ (Re~ all str~s set in well)
C~S~G SIZE WEIGh, LB/ DE~ ~T (~) HO~ S=E C~%~N~NG RECO~ I ~O~ PULL~
20" 94~/-
13-3 72~ '~
SIZE
9-578"
7"
28. PER~ORATIONS
LINER P~E CO P~D
[ TOP (MD) [ BOTTOM (MD) I SACKS C~WIEBIT*
2104' ~ l' '9131'i 1431 sks.
8611' - [10195 ~
'~oP~ To PROUU~O~ (z.~.~ 593~d ~umber)sks.
27. fusing ~co~D [
SCREEN (MD) SIZE ' DEPTH SET (I~D) I PACKER SET (MD)
2,9. ACID. Si!OT, FiIA~CI'LTIR~I~, C~fE:NT SQU~ZE, ETC.
DI~PTII INTI~VAL (MD) AMOUN'r ;,,/MD KIND O,F 1YLa~TE~R/AL USED
30. PI%ODUCTION
DATE FEE.ST Pi%ODUC'rION I I~RODUCTION METHO'D (Flowhlg, gas li~. pumping-size and type of plzlTzp)
DAT~ OF T~ST. II'{OURS TE~T]~D '[CHO!KE SIZE [PROD'N FOR OIL--BBL. GAS,--iVICF.
FLOW, TUBING' [CA~ING PP,.ESSM |CALCULA~ OIL---BBL. GA~---~C~.
31". DISPOSITION OF GAS (~old,'used f~r el, vented, etc.)
LiST OF ATTACHMENTS
Well History, Well Logs, Directional Surveys
WELL STATUS (Producing or
shut-in)
i WAT~R-~BI~J.~. [ GAS-OIL 1R~,TIO
WATER~BBL. ] OIL GRAVITY-A~I (CORR.)
TEST WITNESSED BY
33. I hereb~ certify that the' foregoing and attached information is complete and correct aj~_~letermined from all'available records
and Spaces [o, Aa~di~ti°nal ~) .'~,',"'~n Reverse Side) -
Instructions
?
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report end log on
all types of lands and leases ~n Alaska.
Item: 16: Indicate which elevation is used as reference (where not o;herwise show, r~) for depth measure-
meats given in other spaces on this form ancJ in any attachmer~ts
Items 20, and 22:: If this well is completed for separatc, prcctuction fror,"n, more than one interval zone
(multiple completion), so state ~n item 20, ~]nd in item 22 show the prc:]uc~r~U interval, or ~nte~'vals,
top(s), bottom(s) and name (s) (if any) for only the interv,~l rel)orted in item 30. Submit a separate report
(page) on this form, adequately identified, for each additional interval to be separately produce,'J, show-
ing the additional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well shoulzJ show the details of any mul-
tiple stage cementing, and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for iterns 20 8nd 22 above).
, , , ,
34. SUMM~It¥ Ob~ I~¢)tTMA'I'I~')N 'I'F.:'~'I'N IN('I.UI)IN(; INTEIIV~L TF,~'FED. I'I?E~tJI~E DATA ~ ~EC'()VEI{IF-~ ()F ()II, C;A~
35. G~GIC MARK~
WAT~I AND MUD
Lo~e~ Cretaceous
Unconformity 8600 ' 7710
Sag River 9409 ' 8564
ShUblik 9476 ' 8619
Ivishak Sst. 9559 ' 8689
Ivishak Shale 10126 ' 9178
rill, · . ' i · ,' ' · i r I , ill
AN~+ l~g'P'Ec'~'gi')' s[~'()W~ 0~' OIL. GnS O~ W-A~T~.
In~erva~ .~.ecovery Porosity L~holo~y Shows
Core ~ 99~5 - 9933 9~ Good Sst. Cong~. o~/wa~er
Core ~2 9983 - 10,0~3 100~ Good Ss~. water
WELL HISTORY
BP Well E-4. (24-31-12-14)
January, 1976
5 - 10
11- 24
25- 2/2
Feb. 2 - 3/26
Accepted rig 2400 hrs., January 5, 1976. Drilled 18-1/2" hole
to 2850' Ran 73 its. 13-3/8" 72# N-80 Buttress casing with
shoe at ~840'. Cemented with 4260 sks. Permafrost cement.
Nippled up and tested BOPE. Cleaned out to 2865', ran leak-
off test.
Directionally drilled 12-1/4" hole to 9155'. Ran multishot
survey. Ran Schlumberger open hole logs. Ran 177 jts. 9-5/8"
47# N-80 Buttress casing with shoe at 9131', PBR at 2104'.
Cemented with 931 sks. cement. Cemented lap through FO at
2844' with 250 sks. Permafrost C cement. Tested lap - failed.
Squeezed lap with 250 sks. Permafrost C cement. Tested lap to
3000 psi.
Drilled out shoe and pressure tested to 0.7 psi/ft. Directionally
drilled 8-1/2" hole to 9945'. Cut 2 cores to 10,043', recovering
95'. Drilled to 10,195', ran multishot survey. Ran Schlumberger
opem hole logs.
Ran 37 jts. 7" 29# N-80 Buttress casing with shoe at 10,195', PBR
at 8,611'. Cemented with 593 sks. Class G .cement. Cleaned out
to 10,141', tested lap to 3000 psi. Ran inflow, test with 3580 ft.
mud cushion. Displaced top 2500' to diesel. Nippled down BOPE,
installed and tested tree. Released rig at 2400 hrs., February 6,
1976.
DIVISION 0i: OIL AND GAS
l Eastman ~~ ~~~~ "*~
Whipstock l*"' ·
,. A PETROLANE COMP~
REPORT
of
SUB-SURFACE
D IREC TI OIVA L
SURVEY
B.P. ALASKA INC.
COMPANY
PAD E- 4
, .-
WELL NAME
Prudhoe Bay
LOCATION
JOB NUMBER
A176-S0050
TYPE OF SURVEY
Multi Shot
--
DATE
SURVEY' BY
Shyam Talwar
.DOG-g~G
SE-~[-T-Y SE-GTI.ON
D ! S.T-~q~CE~~GL E ........... DEG/!OOFT
... Z~_7_8 ......... 0 ..... 2.0 ........ 4.7_7, 99 ....... /~2_I, 4.7 ........
5_7.2 ......... 0 _35 ......... 57.1.9 ~ 7
:~ ........ 51_5 .., ~ ......... 53 3.., ..0.0]~ ......... 0_~ 93
. 7.8.0 .... 0.4.0 ............... T 5.9,9.8 ...... _703 ,.46 ......... Si..&,D 0. W 3..,i8.._& ......... ~.,2.-9-~. ~ 3,-&.3-~-22~.~--23--W 0~.!
8~..4 ...... 0_.3.0 ............ B 53 · 97 ............ 7._9.~.,.45 .....
~_~8~_0__33_ ._9/+.Z_,9.! ..._ __8321,,_45: _ %13_,.0..~ ............ _5.,..OL ._S .......... !.,~9~~ 5-,~~ ..... 30 ..... 2~.W_ _ - 0 ~096
1 ~~_0._~0_ , 1041.96 ......... _98 5..,_4&_~31..,._OO~t
~3_8 .... 0.~5 ....... 113 5., 9.8 ............. 1.~79. ,A~ ......
-0*38
........ 0.-84.
-~
8.,~.6 _. $ ........ _2_ ._4 [~ w
9~00--.S I2-~~
9--,-/* ! .... $--12--3~ .......... 0-~-8 ..... ...........
!,~ 5~-W ...... : 9:00 -: S--.~-~-~! 0: ~- 5,6
...................................... ALL_C AL. CiLLA Ii 0 N S.._g. EREORMED_B_Y__I_B_J~4_EL_E~CX.R~I.C_C.~P.U_T~F~R
.TRUE
.~5A:6 _0_S_5__25..~.5._,.9~ .... 2.~ 8_9 ,..43 ...... S2.1_,.O0.W .......... 9.,2_5_5 1_,.~. ~&,..8.5.~... _ 8 .... ~~ 0 ~? ..... 3-..~
2_7..3_~ ..... O__!...~ ...... 2.73.3....tg.&. .2 6_17_ '..Z~ .......... _S_~.!..&OE 10.93 s 0,81 w__ t0,96 s
2765 0 35 27(:-,a,94 2708,a2 $83,00E 10,94 S 0,58 W 10,96 S 3 3
,,$006 2 3..5 3005,.87 29/4.9.3.,5 N39.00W 7.i4 $ 1./+0 W 7.28 S 1]. 6
".3'f0"1' ....... 2+" ....... 0 ...... ~ 1 o 0 .'72 ....... f0'~'4-;' 2"E' - N" ~'2", '6' 6' ([i ........ '3'-. 36 s 5.32 w 6.29--$ 5'7 42
--3291 7--'i-0--'-~-2"~'9-'-7"5 3233.23 N68.OOW 4.81 N--22.30 W 22.81 N 77 48
46 W
17 E .
49 W 1,486 3.06
9 w 1.943 11.19
.........
19 W 1,400 21,89
3951 .................................... 22 50 3927,35 ~¢.70,83 N64,00W; ...... 73,19
4045 25 0 a0!a.18 3957.66 N63.50W 90.23
~140 27 0 409R.67 40~2.15 N63.00W 108,77
~234 29 15 ~181.56 a125.04 N63.00W 128.89
4~23 29 ~0 ~346,70 ~2~9-0-'18 N61,OOW--172,04
4612 29 45 4511,28 4454,76 N60,OOW 218,14
W 36,18-N"-7'4 4 14 W 2.105-- 35.30
W 52.02 N 71 50 6 W 1.246 51.16
W 70.68 N 70 9 29 W 2.479 69,86
W 93.3~ N ~8 50 32 W 2.8~1 92,57
W 119.81 N 67 56 14 W 2.224 ' 1]~04
158.26 W la9,9.3 N6.7_..1~ 46 W__2.737
169,44 W 184,57_~._~.6 38 11 W 2,989
203.98 W 223.05 N 6~ 8 17 W ~_2_16 2_2_2~j_0
280,26 W 308.48 N 65 18 7 W 2.394 307,77
321,27 W 354.67 N 64 56 12 W 0,361
361,43 W 400,29 N 64 ~2 41W 0,311~-, 399.69
..........
40!.89 W 446,67 N 64 7 27 W 0.37-3 446,18
442,09 W 492.98 N 63 44 10 W iii:03~4__~0' 4923_5~
/4-7_q~__30 ..... Q .... hg. 9.Z_t?~ .... ¢_535,...4_!__.~_!.8~0.00W 241.31 N ~82.21 W ~9.2~ N 63 2~ 5fi W
479~ 30 i5 4672,~6 &615,84 N59,00W 264.99 N ' 522,42 W 585,79 N 6~ 6 1~ W
o. 269
0.383 ' 5 S
RECORD OF SURVEY
.......................................... A.b.. L .... c A L..C...L2~ 67_:[O ,N 5., .P. E_R.F O _R ~:_E ~__..~. Y !__~__ME _I,.,._E.E.T_RQ.I.N.._I.E__¢D~P_U_IE.B_.
__
.......
DEPTH AN.~...~- ..... ~...EPTH SEA DIREC DISTANCE ANGL~ ...... . ~_~G~~
_~.~2..7.0 ..... 3 L ........ 0 ..... 5..q7.9., 28 ........ ~.q 2~.,. 76 ...... ~_.7..~..,_O.ON ..... 3_7_6., 2.~___~C___Z_3~_,_.~O~ . .8_2_~_,.9_2___N_.5.2 ..k_9_~_3__N~ .. 3_,...2~2
5.3_~&_3.~__4~5~%!57 ,..7 7,5.j.P. 1..,..25 ..... N?_l..,~.,,03.~ ~.9..2_,A_5. N _ ~8_~,~_~_W . ~73_~O_7_.N_5.3_gO_~ 2 ,~_5
5~_5_7__.3 5 ...... !.0 .... 5 23 3 ,.~.9 ...... 5_1.77, n 7 ........ N..7_!._.,_5Ow ~_0_9..,._7.8~W_ E~JZ_,_5._0~ J_~!.,.88._~._._6.3~7_3_1 W 0 ,_~.6
__5.5.5 ! .... 3.5 . 0 _.. 5.31.0,9,.2 ............. 525.z, ,.~ 3.9 ...... N72., 0.0..~( __ ~ 2_5.,..~.O.JL~_8_8.3_,,,.8.1_L___9.8_l,,,.~.Z_N_64_i 3__~.3.~_ ,0_~2
5_~,(,~_3 ~_~..5 ........ 5..3.$..8_.,_8,~__5...3..3.2..,..3 2 ..... ~J...7.2_.~...0_QJ~L_._9_~.3_,_~..8~ _ ..... 9.33_,_~7_~~ ....... L0JJ_,.Z?_LS.4J_LJ_W ..... - o. 263
_5_8._3~_.3 ~ .... 0 ..... 55~6,0..l .....5_~.S._9,49 .......... ?{7!.,._0qW ..... ~.7 8.,.68_.N _.1,.Q3_6_~_~6~ !_!_~..!:,.~_S__N__65 ...... i2_ ~_L~ _~,5B9_ 1
5qz_.5__$..s ..... ~0 ........ ~.7~3,23 ....... 5645,...71 .......... N7_0.~.50~. ........ 513,04_.N i_13..5..,...3.6__W .... 1_2A5_,_9..0 N 65 ....... ~0 ..... 58_W_ _O_,..Z~B
_fL1_!_9_3..3 ...... 0 .......... 5...7~ ~, 84 ........ 5725,32 ...... N 7..O.,_O.OW_ ....... 53_0 · ~6__~L I~_83_,_8_Z ~z~ig.9_]._,_2B..~6.5 _5.!._~_0_~ ....... 0~_5~3
5215 32 ~.0 5850 ~2 ......... 5_~..0.~..,..3.0 .... .N.Y..0.,.Q~L~5~..Z,.8.9~ 1~,3_~~_~,,.1~~.6..6. _~3...~W ..... 0 ~1
5~07 B2 Z0 ~9ao ~? 5883 65 N?Z,00W ...... 55~,T~ ...... ~__ i~.Zg_,_ZT___W ~3~..8_,_~_~_.N ...... 5b_. O_.~.3_W .... ~,.bZI
...... 6..~_0,2 ..... B.2 ..... 0 ....... 6_020 · 55 ....... 595~, 1.4 ......... N.7..1.,~O0.W .......... 58 1 ,..1~ ....... N ....... !_3_2_6...,_98 ..... W .!..~.4_8...,._66_N_..66__2,0 .5_7 W 0.,~ .~ 1443,3~
549~ 31 aO 6100.52 50~a. CO N7I,OOW 597.28 N ~373,86 W 1498,08 N 66 30 10 W O,~l
67J1 30 45 63aa C5 6~. .53 NT0,00W 6~_,_7.0 b i~_LBJ~ W 1_6_~5_,_8.0~5.6_5~_W ~3~&
6.~7_.0___3.~__ ._0__.__65~02 ... 1.3 6~ 5_0. ,61 .......... N.6..g.,..5._0W. ..... 6~_9_,.i.Z_N 1.603_.,_ZSW i_7_~_L,L7 N_&7 ..... 2_~B~ 0,~--~8
.
705~5 29 40 6~%8_9_,~4__ 6533,02 ~0,0QW 69~,5~ 16.4_7_,55 W 1788,3_~_52._5_4.5~ 0,3'7!
7.1.59 ..... 29_3.0 ~67!...,_2_8_ _ 6.6..!~_,76 ....... N 70.,.0..05~_ _ZlA_.,_4.1~,~ .169_1__,2~O~~ .~.8~_~.,_~.~_6J__.11_ _8 W 0 · 18 ] .--
7443 ...... 28 ..... O ...... 6_9.20.~_!_3.__>..863..,..S_t~.6.7_,00W .7~D._,A!~. 1_8_1._8_ ,_9~_ W .Lg_Ti,A8~_6_7 18 .~.5_ %~ 0_,7~2"
7538 27 45 70..0.~..,_t_!_ 6_9.~7_~5...9~>16_7_~_O..ON_~_7_%_~_5_b: 185_9_,_82 W ~_0~_,~D__N_5_7~..S~.0 Vl~.~, g 63 ' 20 05.
7633 27 I0 70_8..8..~._~_0 ....... ~_03_!...~._~_~__N_SA.,e_0~w 795,23 N .... 1_839,~9_W 2059,70_B_63_iJ_l_8_W , .O_,_6~
.7_7.2.8_2..7_ 0. 2.1..7.2.,..99 .... _71.1.6 · ~.7 ....... F~5~.., OOW __.8.L3_,5_1~ ~ 93~.19_~~,..9.2_N_6_7._1~ ~9__W - O-,..~Ag. 209-2
ALL CALCULATIONS PERFORMED BY I B N ELECTRONIC COMPUTER
.......................................................... STATE-OF '''""'--'-'"'""V-
~9[F~'-'-D'R-i-f'T--~'-~'R-T"]"C"A-~-- '--S'~"8 ............ ~'~"i"F"T TOTAL COORDINATES
DEPTH A,~ iG L E~: ...................... DE,._°_ ................... TH Sr.A."'_ ....... ~, D I R ~C
D M
_D_O,G_.kE C~
C b 0 LU_ R E _$ ,%~_~I.T.Y
D l STANC.~ AN.G._L._~_ - D_E,_G/i_OOFT Di~.ZAN~E
7918 7,7 0 73~+2.28 7285,76 N62,00W 852,67 N 2016.05 W 2188.95 N 67 4 28 W
_.
8'012 27 0 7~26.03 7369,51 N62,00W 872~70 N. 2053,73 W 2231.46 N 66 58 39 W
~-1-06 ........ 2 7 ....... 5~ .... ~7-5'09, '7"5 ...... 7'~-~'"~'~"2'~ ...... ~[6"0-."0'-~'~' -'~-~-3-"i-~"2' .... N 2-O~i-'--l-i--~ .... f"ff'3"~-9"7 ..... ~'-"-'6'~ .... 51 ...... 5'5 W
8~C~2"~--4-'5~-5"9'~"~-"8"i~536.29 N58,50W--915,92 N 2128.93 W 2317.60 N 66 z+~ 16 w
......... ~2"~5 9-'~ ....... 0---~'~75,'"1-R ........ ~'~i"8"'-'6'~ .... ~"5-5'~'0-0'~F -'-~'~-1,86 N~2168,49 W 236a.21 N 66 31 2! W
~---$'3"') 0 s'~ ......... ~'0---7'7~5'~''.-3''~ ..... ~'69'g~'."s 0 ............. NS"5"ZO~'w ...... '~-6""ZO--~---f~Fi%-~~f~--i"~Tg-~-~-'S~-'~7 ~ 7 w
....... ~::--'3"1 20--8:7"9-'~'"2"~---'8"0"22'"-72 .... ::~-~"0'0':,~"' l'b'fl~,2~ N~2368.92 W 2605.27 N 65 ...... 2~_..._.~_0_~ .
-' s-~-~'3 ..... 3'::-'3"'~ ~'Y6d',":'-: ...... SYO:',"79 .......... ~'sY,"~O':~/ ........ :':i'3""7'j:9~-'2-L-6-87~"3-%~ '121'5-3-Y~"5- ~ s9 :: ~ w
9708 30 ~5 887~.S5 8817.~3 N~,OOW 1~07,26 N 2752.02 W ~090.95 N 62 55 0
...?:<~:Z~':2~-~:~:: ::~':~': s':~-i-:~-?:~':~"~"?'C2':~.'~:'~-::,'_O:°' ~,(-._:::::::~-31~-.,:~3_.~_ 3_~ ~_~.,3. ~.._>' _ _~._~ ~_~.,_.~ ~_._~ ~:: ..... ~:
10195 BO 0 9295.36 9238,8~ N~O,OOW 1537.83 N 2915.95 W 3320.2~ N 61 ~5 ~8
0.000 2_221_.01
0.~52
1.80~
2,~2
O.lS9
0.5~6
o,3~? 2~_~..~.~_.8..1_
.o_,5~..~
o,333
W 0.558 27~6.8~
W 1.062 2755.27
W 0.8~9'
w o,~__~o 3*¥
W ,,0m_%~..2
W ,O,.~l~
TRUE
E'PTH ................................. D~"~ TM .......... S'E'A ...... D-IF F E'~~'~~~T~-~/
257 257. 200 0
TOTAL COORDINATES
0,00 $ 0.00 W
0.00 S 0,00 W
357 357. 300 0
z~57 457. ~+00 0
~ ................ 5'7 'sT~"" .................. ~,"00 ............. o
75'7 ................................ 75' 7"' ..................... 700 ..................... 0
~ 5 7 .............................. s' 5'7', .................. ~'o6 ..........................
'~'5-? elS-?-" ......... 90'0 ........0
05-7 ..................... T0"~'-7";' .............. :['o'0'0 ................. o
i-':-'5--? ...................... ~ 1-'5"7-'~ ................ :"11"00 .............. 0
1-2-~-ff-- ~ ............ " --
~. 25'7 ~ 1200 0
0 0.00 5 0.00 W
0 0,15 S 0,05 W
0 0,79 $ 0,36 W.
0 1.85 5 0.89 W
0 3.13 $ 1.27 W
0 4,15 S 1.28 W
0 5.10 S 1,32 W
0 5,78 $ 1,64 W
0 6,08 S 2.01 W'
0 5.31 $' 1.97 W
I-:' 5-? .................. : 'ff 5'~", ......... 1'3"00 ........... ;'0 .............. o
1"~'5"7 ........................... 1"'~'5'7'~ ........... 1'~'0 O' ...................... o --o
1'5'5'7'-- :'5-5T.---i'5-00 0 '0
165'7 .................. l 6'57", ........... i 600 ......... ~' ......... o O'-
t'75'7 ............................ 17"5'7'~ ............. i'7 0"0 ............... 0 ......................... 0
I"g5-7 1-8~5~-;~--I'~'0'0 .............
l-q5'~ ............................. i'9'5'7-; .... I'"~'0'0 ....................
2"057 ......................... 20-5'?", .......... 2'000 ..............
2-1~'~ 21D?.-- 210'0
2257 2257. 2200
2357 2357, 2300
2457 2457, 2aO0
2 ~'57 ...................... 2' 55-7; .... 2 '5'00 ................ O
ff6'5-7 .......................... 26"5"¥; ...... 2SOO ............... c
2757. ~700 O
2R57 2-8"5-~% .......... 2'8'00 .................... O
~°97 2957, 2900 0
6.64 5 2.02 W
6,73 S 2.06 W
6-;-~%--~ 2. o 6 w
0 9.18 S 2,11 W
0 8,91 S 1.36 W
0 9.19 S
0 9,86 S
0 I0,73 S
1.40 W
f'"2-~ w
0 10.94 S 0,66 W
__ ._
0 11.7t S 0,12 E
0 8.65 S 0.29 W
0 5.22 S 3,18 W :: '
0 0,95 $ 9,04 W ·
1 3,28 N 18,55 W
0 8,31 N 30,79 W
3"~'~7----3057, fO'6'O
3"1-'5~ 3157, 310'0
3a60 3457, 3400
3562 3557. 3500
14.82 N__ 46.._1_1 W
22,86 N 64,06 W
,SUB .SEA DEP__T_H..,_
........... M E A 5 U_ R E D. ................. ~_E.R. !..I ~. A.L__ S u ,.q ............ 3d. D.r_ T V D _Y__E.R.t I_CA L
.D._~ P iH ........................ O.E_P._T_~ ..... _$.E.. A.. D._I._F_E_E.._R_.~_.N_C._E ¢_O.R_R__E_C_T_I_.ON ....I.O_T_Ak___C.ODRDiZNA_T_5~S--
....... 33_~3 .... 3757. 3?.00 .........
3.8_7_5. ~_85..7..., ............ 38.o_o ..........
_~_.9_8.3 3.9.5_%, ............ 39 O0 ........ 26
4..2.0.5 ................. .~..1.5_7, ............. ~_10 0 .............. ~_e .! Z
4 32_0_ ~ 25.?._, ............. 4 20 0 ................ 63 1_5_
~ ~+_3_4~_~ ....... a 357. ......~._30.0__77 1_4
_4_5719_ ................. ..a 4_ 5_.7, ....... z~ 4 00 .......... 9..2 1_5.
4. 6.6~_ ................. ~_5 5..7., ........... 4 5 oo ............ i02_ _ !5.
~ 7~ o__ ~ 6.5.7.., .... .4..~.o o ..... 1.2..~.
...... K~..~_.5 ................. .~.7.. 5...7.... .............. ~ 7 o.0 ......... ~ 3 8 15
5o~2 ~s57. ~oo ~55 17
512 S.. 4957. A~900 171 16
5 z/~..s ................. 59_5_.7..., .......... 5. 0 o o ........ ~.._8.~
53~z 5157. 5~00
5?¢ ~, 5 z 57..: .... 5.20o ........ z_Z._7.
5 60..7_ ........................... 5 3 5_7. ............ 53oo ........ _2..5 o z 3
5728 5457, 5400 271 Z1
5'~ 9 .............................. 55 5-7", .............. 5500 ............. z. ~ 2 21
5969 5557, 5600 312 20
6 0_%.~ .................................... 5.7:5. 7, ......... 57 o o ......... ~_
6208 5857. 5~00 351
6326 5957, 5900 369
6 4 ~.a ..................... 6.0_57..~. ......... 6 00 0..~ ...... 387
6_56_2.
667_9
6795
6a!]
?.p..z 7
71.42.
7257
2O
19
18
_1_8
18
17,
1_6
6.5_5~..~__6600
6757, 6700
4.8.5 .................15 .............
500 15
.~_3_.,_3_.9_jN ....... 86.,..2..2_~:
el,_8_8__IN.~ ........ i. LZ..,_9.3__W
6_0._,_8.~__~ ....... I,~.4
7_.8..,._7_0_~ .... 1..8.0.,.,
_9~9~,..,4.1 ___N __ _ 23_2~._0_1__W ..
_.LZ2..,_53__JN ___2.6_7J_73_ _W
1_4.~_,_1..5__l~ ....... 3.1..7_,33___W. ... .
2_01..,5_6._J~._ . 4..15..,_1_0 W.
Z_3_l__,_0.7__IN~_4._6&.,Aa__W .......
2_&0_,_2_5__.N..__
Z_%0._..!6__ ~ _ ~_6~_.D_Z __W. ,,
:32i.85 N 6i~.60 W
, i
502.81N 1106.12 W
__525.03
5 ~, 6.9,~ _N. ~ LZ. Z3_,_.I_6___W
568.0 i .N. 1_~..88
__.5_8_8_,3__7__N_ 13_4.7._,_9_ fl._._W
6 08_,_7_~__N 14_O_6.,J~9__W
62_9_ ,3._7__N~1~. 6~_, tO_W.
6.4_9_,_15___N ....
6.6~,_k1_~ ._ 1
6_8_9_,_2_1__N L&29._,_8~1 W
.7.D..8_,3._~_.~
727,5~ N 1736,11 W
7_%7..i..
7~8~ 6957,, 6900 527
75'9'7 .................... 70"5'7' ' .......... 7'0 0'0 ............ 54-0
l_Z+ _7_4__7_,16__N 17.83_,3_7__W
13 767,9i N 1836,62 W
13
788.57 N 1884.90 W
770q 7157. 7t00 552 12
78'2'2 .................................... 7'2'5~7-~ ................. 7'2. 00 ............ 5'-65 ! ~
7357 7300 5 12
80~ ........................... ~ 7~-~"Y'"~ ............ 7 ~ Oo ............ ~-8-9 1~
8159 7557. 7500 602 13
8273 7557. 7600 516 1L
8390 7757, 7700 633 17
8 ................................ .50 ~ 7"8"~-?-'; ........... ~"a'O 0 55 ~ ~ s
809.75 N 1931.z+2
832.49 _N. i977.28
856.07 N 2022.~5
880. O~ N
905.83 N__211_2..,_11
935.66 N 2159,13
970,20 N 2208.96
1005,42 N 2259,59
i-6-40.78 N 2309.04 W
87~'i ............................... 80"57. ......... 8'0'0'0 ............. g~,'A 16 1076.04 N
9 09% ................................ ~"3 ~'? ',- ............. 8-30'0 ............... ?3 ? ................................... f"a ........... 1-1-8-'~-;"~:5--~-~ 2506",-7' 5
92"~'3 ................................ 8'-4'5'?'~ .................. 8'4"0"0 ....... ?'5"6' 19 12'2-5.91 N 2557;'65
9'~'5-2 '8"6"5-7'. ............. 8'~"00 ...... ?'95 19 ....... 1312. i0 N 2'656,9'6
87'00 ...........
;-----8-8-0'0 ....
............. 8-9'00 .......... ~'4"? ............................ i-6-
9000 ............ ~'2
W
W '
.W
W
W-
W
W
W
W
W
W
W
W
W
W
W ~
W
INTERPO~_&,TE~ V&LWE$ FO.q EVEN
....................................... ~_~.,_~_.~ ...................................
MEASURED VERTICAL
1000
2000 ~999 ~9~
........................................................................ · ....................... · ...................... 8_,.~_~__s ~ o w
3000 2999, 29~3,
' .__: ......... ~ ............ -_~_[._:___X_: Z.~; ...... s-I ..........: SC LE_._~. :500-~ ....... : ...... l ....... :_.z_c._, ..... : .................... ~ ......~ .......
- ,~ ................................. '-4.- ..... ~--:--: ........ -~--:-~--~ ....~-z~:--~-~--I-~-~-.: ~ B.R ALASKA INC.~-~-~i- ............ }-'~ .... ~-"~-~ ~-'~ .... ~--~-"~-~
........ '~ ..........: { .............................. i ........ : ..... ~ -. RADIUS OF CURVATURE ~ETHOD} ....... : ~ ............. s ............
...... ~- ........... ~ .................................. ~ MAGNET'.lC MULTI- SHOt ....... : ................. ' .............
..... ~ .... ! .................. ~ ....... : ..... i ....... ~ .~ " ' '-~ .......... i ............ ~ ........ : ....
........... ~ ................. { ......... : ...... : ....... ~ ............. ~ .... . ] _ __~ ........ , .............. '. ............
! '
. .LZ'. . .Z-'Z'/~'..7 ............................. - ............ : ..... ! ........ '. .......... I .......................: .........
.......................................................... a '- ............ - ....... ~ ......
~ ....... ~_.~VB~._9, 95 ~ ......... x ............. ~ ........................... ~ ........... ,~ ....... [ ........ { .... ' ....................... ..
......... ; ....... : ........ ~C:.:~ ~-' '- ............. ~ ............................ ~ ............. F-: ..... -c-'~ ..................... , ....... ~' , '
......... { ............ : ....... <--'., .... :'' ~- ~ ................. > ........... { ............... ¥ ......... ,-"'c ......... ~ ........................................................ ~
....... :~ .......... ~-Y ~-. .~~ .... ~ ........... ~ ............ ' ......... ' ..... ~. ............ ~ ....... i ................. ~ .............. 4 ............. : ............. i ....... ' ..........
-'"' ..... ; .......... ~' ~f;-";"-'~ ......... ~ .... - , ......... : ......... ~ ......... ; : ......... i ....... : ....................
.............. ~-.'-. ..... ~.~--< -----i ............... ~ ....... :~o ..... ~ ........ ~ ....... ~ ....... :":
.......... ~ ............ ~ .... ~ ....... ~~ p - _ ~ ~ ~ ~ ...... ~ .........
............ ~ ............... ~ ......... ~ .... ~- - ~- · ~ -~z~- ' ~ .... ~ - - ~ .......... ~ .... : ....
......... i ............. ~ ' -'[K" ~ .... ~~~.-~~'~ - ~, - ..... i ..... ~ ................
- ; ...... ~- -~ ............. .. .';~._ . }' -"-; - --'; '~--~: ............. ;.-~ -~-~~; ............ ~- ~~;' .: ; ~ : ..... ; ......
, ........... ;.-~ ....., i- .... . .........: ....................
t . . I ,, -
...... ~ ...... ~-~-= .... : .................... ~ ...................... ~- ........... ~ ............ ~ ........... ~ ~- -- B. R ALASKA INO.' .............
' - " ........... J-' .... : .... ~--u ...................... ~ ........... I ....... ~ ..... ~ .......... : ..... WELL
~ 16~ .................... u ...... RADIUS OF CURVATURE METHOD ............. ] ...... = .......... ~ .....
....................................... , - ' - MAGNETIC MULTI - SHOT ........................... :-': ........ : ...... -~--
'..' ............ ~ _~ ~ '_. -_ :- ....... ~ .... :-.. ~__':': .... ~:::~::: .---:S-~-~"~'.'-.~.:L:_:_' ~ ~_~"~'i_.-_~:.-!
......... ; . _~ .~ ....... '-SS. ~ ....... ~ ......... .... ~ ....... ~ ...... ~ _' ....
..... '.: -~ ~ ..... ~ ~ ..... ~ ..... : ...... ~ ..........:~-.~ ...... ~i .'. ~ ....... ~.' .~ ....:. ~ ........ ~ .L ........... : ....
..... ..... · ~ .... ~ ~' · .... ~ ~-.~ - ~ -.. : .....~ ....... :--:---:.--~ ' '- ..... ~ ....... ~ ....... ~ ....... - ....... i ............
" -: ~-~ "~ -~ ':% ~.~..~_S~' '~'~:-' '--- '~ .... ~ .... '~ ............
' ~ : ~'-.-~ - ~-- j~.._'~: '- ' · ~ - ~ .............. ~ ..... ~ ........................- : 'i ....... :'- '
....................... > ...... ~_~ .......... .... .......................................... ~ ..................... ~ ..................................................... ~ ..........
............... ~.: -~.~ ..... -- - ............... ~. ' - : - : ..... ' ~---' ............ i ........ ' ........ ~ ..........
- .'- . . :..:.- - I ..... ':;_-.. : '-:.'-.' ~_.:-._-.--- ~ -. :' ' ' : - ~ ..'-_'.'._~ .... :~'-.--'.._-i-_
..... ~ ..... ~ .'- ~ .... ~ .~ . :.. . ~ ...... ~ .......
................... : ...... I ............. ~ ......... ~ ............... ~ ................ ~ ..... ' - ......: ......
~ . . _~.~ _ i __- ........ ~ ........~ ..... · _ : . .~_ . ~ .....
~ ..... ~- ........ ~. .......~. . ........ ~ ' ... . ~ ...... ~. _ .
. ..... ' -:~ :._ ................... ... .... :..:-::.-~:._~__:.~":..~. :::~--- <:~-:::': -~' ::~::::~' ...... ~'~'-::--:- ~-""L~'~ ' ....... " ' ' .... ~ ......
~-: ..~ ..... '-..-~': -';...'":-.::_-~'_':_"~::._:i:':"":'.:." ~'~__ _ '_ ~ .... ':.~'-_-:"'_ ~.-.'_..:.:.':.::'::. '~ ...-_':'..' ': .. ':..~ ': .... ~ '.-'."-. ~ ..... :_'_"
. . .: .... ~ ..... : .- .... ~. - ~ .......... ~- . _~ ........ ~ .......
.......................................................... : ..... ~ ................. - ................. ~ ........... : ................................... ~ ............................... , ................................... . .............
~ ...... . ........ : .... ~ ....... : ...... ~ ..... ~ ...... . ..... : .... ~ ; --
-' .......... . .... . ...... ~'7': ..... -:.- ...... S-~:LS:~S:TS'~.-SS-~--':-' -7~-T~ ....... : .... S-'-'S- .......... . ~' ' 'C--. ...... S .......
.. i ' ; '' ~ ..... - ~ ' ~' ' ' :
....... '- - ~ ~~- :- ~oo~ ' '
. . ............ ~ ....... . -- , . ., .... ........ ~-. . : --.
.... ..'":"-: ........ : ..... . ............ -' :-"'~::::-:~"::'5~:':_':-:-'-}-::-:-: .... ::-:~:--':5'::~:':::" .... :~::-~: ................... . .........
- - ...... ~- ' ' · - , ........ .... i
- ..... ~- ........ ~ -- - ~,- TVD = ~,S~5 .- .... - ~' .....
/ Eastman/
~ Whipstock l~"))
· A F~TROLANE C__gPMPANY
REPORT
of
SUB-SURFACE
DIREC TIOtVA L
SURVEY
B, P, ALAS~& INC.
COMPANY
PAD E-4
WELL NAME
Prudhoe Bay
LOCATION
JOB NUMBER
TYPE OF SURVEY
Single Shot
DATE
SURVEY BY
OFFICE
FORM D-30Z F~Z
COMPLETION REPORT
O.~C_k.~.,N.&T!q~! ....... 3_! .... O_~.G. 15 M Z r.~. E A S T
KB ELEV, 56,.52 FT.
RADIUS OF CURVATURE HETHOD OF COMPUTATIONS
COMPUTED FOR-EASThiAN
At'
· 1 li,,,~LI ~1 I I/""%1,
RECORD OF
ALL CALCULATIONS PERFORMED BY I
SURVEY All' U? ALASKA' COPY
C_OMPUT_ B _ ....
TRUE
,MEAS. DRIFT VERTICAL
SUR__ DRIFT TOTAL COORDINATES
DEPTH ANGLE DEPTH SEA DIREC
D M DEG,
D I ST A~q[_ .A_N_.G..L_E D_E6/iOOFT D
0 ·
196 0 0 196.00 139.~8 $21.OOW 0.00 $ 0,00 W 0.00 5 0 0 0 W 0,000 0.00
~2gu 0 0 29o,00 2~3.~8 S21,OOW 0.00 $ 0.00 W 0.00 S 0 0 O, W 0.000
~8~ o ..q .... %8.~.....qq ..... ~_..~_7~,..~..~ ........ S..2_~.oow o,_o.o_._S o.oo w o.oo s o o o w o.ooo o.oo.
0 20 477.99 ~2i,4.7 S21.OOw 0.2~ $ 0.09 W 0,27 S 2t 0 0 W 0.~62 -0.02
478
572
666 0 50 665,98 609e&6 S18,00W 1,99 S 0,94. W
7~0 0 40 759.9R 703.46 SI4.00W 3.1R S 1,29 W
83a 0 30 85~.o7 797.a5 Sla. OOE ~.1~ S 1.29 W
948 0 35 947.97 891.~5 S15,00W 5.01S 1.29 W
!~.F2 ........... o 2.0 ..... !_q.~.k, ?6 ..... 985_.~.~ ........ S~.1._~...ogw 57.7.1 s 1.59 w
1136 3 15 1135.96 1079.~ S65.00W 6.03 S 1.9~ W
2,20 S 25 26 57 W 0.266 -0.05
3,43 S 22 3 27 W 0,181 -0,28
4.33 S 17 !_9 ~7..W Q_._!_8_!
5.1_8 _$ !4 30 2 W 0.096
5.....93_$._!.._5_~...5 6 W 0_,2_6_6 . -
6,3~, s 17 .53 38 w 0,096
1230 0 5
132~ 0 15
I~18 0 0
1512 0 5
fEO-6---o o
1229.96 1173,44 S39.00E 6,27 S 2
1323.96 1267.44 S25,00W 6.D3 S 1
1417.96 1361,a4 S25,00W 6,72 S 2
--1511.96 1455-~-~4 SII,OOE 6,79 S 2
1605.96 1549.44 S O.OOE 6,86 S Z
· 00 W 6,58 S 17 42 51W 0,170
.97 W 6.82 S 16 47' 9 W 0.170
· 05 W 7,03 S 17 1 28 W 0'.Z66
· 06 W 7,10 S 16 55 21 W 0,096
.06 W 7.17 S 16 41 51 W 0.096
-1,03
-
-1'21
- 1.
170C) 0 0 1699,94 i643,a4 S O,OOE 6.86 S 2,06 W
7.17 S 16 41 5i W ,0.000.
1794 .q 15 1793.96 1737.a4 S O.OOE 7,07 S 2.06 W
__1982 0 30__!9~1.96. 1925.44 S36.00W __6,35 S 2,22 W
_~ 2..03._~__0 .... !.P.~P_Z_%~.9.~5.__Z~O.!,~!.,?3 .......... S ..... 2_...O0.',L___s.~D_~ S 2,40 W
2J l¢__.o ...... ~_2.L(~.9_,.9 ~..8_l.Z 2~ ..~3 ...... $ .o..._oo..W_ ........ e_,..Q_O_~ .... ~ · ~o w
2264 0 35. 2263,95 220'~_..~.3.__~_5...~_,00E 9.18 S 2,05'W
2358 0 20 2357,95 2301.4~ NSg.OOE 8,90 5 i.~ W
7.36 S 16 14 21 W 0,266"
7,89 S 14 54 22 W 0.191 ·
8,64 S 14 54 51 W 0.07~'
9_.,_1_8__S__i_5___9__!_8 W ., ..... 0_,_3_~_1 ............
9 · 3_1_s_1,/+_5.6__~_ w__.0._,_!_8_1 ...........
9. ~+ 1 S 12 .3.6_~_!__W....Q_. 6__2~,
9.00 S 8 37 22 W 0,266
- 1
- LtT3
,1
RECORD OF SURVEY
~ R r""" __
F/_ E..A_,~,.._EL_!..r'_T V_ F~_T...I_q.&L S U B O R
DEPTH ANGLE DEPTH SEA D
:'~ D M DEG,
ALAS? , COPY
..... D_O6LL_E_6
C k._O__,,S_.~F.~_5 . ~ TY 5EC_T_I.ON
..Ei_$~_6 E .... A_N_'..GLE_.__ D~CzL.1J20 F T D_LSIAJ~iC
. 2_7_3 z+ 0 ~... 2~733.,9 4 ..... 267...7_.,.4_2 ..... 58_8..,.0DF. ....._1_0._,_93_ 5___. -~ ~
......... 0..,..8 .... W i.0_,..~6_._5. &__15 ..... O_m o ,.2~
__2.2._6..5___0_3..52.7_5a,.9.4 ..... 2.70_8 ,~2 ..... $8_3....,...0._0_E__ .... l_0_,_9.~._$ _. 0_,...58 W ....... L0_,._9_6 $___~ ...... ~_.~_6_W ~_-.L,_0_g__7.__
292 ~ : ..... 0 ~ 2.92.3.. 9.3. ......... 28_5.7...,..~.: ...... ~..._.~..,.0..0_'~ .... _i~_,.8_7__$ 0...,_8.~_~_ 1_0.._,_9._0 S_ .... E_.2.6 ~_1_.~_ . 0_,_7_B3..
- 5._,.5.5
30~,0.._ ...'~ 0___'~079,84 302~,32 N4a,OOW 5,97 S 2,2.2 W
__%:_7_5 ...... 5 .... ~_q._ _3!7 ~., ~ v .......... ~:: ~., q~ ......... N.6.7....,..0_g?~ .... ~_,.q!_.5 ........... 7_,~ 8 w .... 8_,5~._S_6~_!.8 Z_~_W
%3.~..:....:_%~ __3.:.3 !. 5 5 ...... ;!2_7..~, o: ......... ~.69__,_0_q.~C~ ~_,.AS__J~ ....... _2_E,.~.6 w 27_,~._~ 8!__28 ~_: w
3746 16 30 3735,22 3678,70 N6.6..,Zu_y~ ~_~3..5_~ .~__~.Q_2.,07 w ~.0~_,~_2 N 69 17 35 W
38~ 20 ~5 3879,23 3822,71 NSO,OOW 60,60 N 1~5,29 W 157,~2 N 67 21 26 W
__402~ 2~ :5 ~%~..,6_2 ....... ~_%3_%,..~0 .... N~_5..,~OW ~2,~ N :S~,23 W 205,5: N 66 ZO :~ W
~..!~_0 _ .2J .... q .... .~..!.09 ,.2 2 ......... ~ q~_%77_0 ......... ~.5_~._,_Q.0 W :0~,07 N 2..3Z,~.!
. 0_.,._.8._0_8 - ~+..., ._53
2 ,_6_~$ ...... 5,75
1 ,J?~6_6 2 3... 5 9
1._9 11
~,3_3_.,l ..... 8.9,.91
i_,_8_7 2 __ lO 8 ,. 5 O
_2,~8~+0..., .... :~7,~_~
4310 28 z+5 4250.64 419/+3_.1_2 N57.00W 135.50 N 306.14 W 33~+,79 N 66 7 30 W
46~6_2.~95 45..2.~.~_5__.446_9_,.83 ....... N6.~_,_O_O.W ......... 199,52 N ~,.~_,~2 W 489_,_!_~ N 55 55 40 W
493_S__30__1.5_~3.9_6_.,_5..5 4YA0..0_3 ....... N 5.9.,_O..Q.W... 2.7_~_,_9_3~: : .~..8_'..3..6_8~ _ :' 6_~_~_7_6_N
52_~6__3_2._3.0 . 5_9_0_?_?_7.~ '..5. ~..5_3_.,__2_4__.~.7_3_,_pp W__
6~50 31 './+5 6150,28 6093,76 NTi.OOW
3_2_0_ .,_l_O~.,_____OY~_ ,_2_7__~. '
3 36 · 22___,.N. __7._1_8._,.5_9
355,74 N 782 .z+Z
408*37 N 949,34
424,53 N 1000,60 W
505.96 N__~2~_~_,~ WI
552,63 N 1410e57 W
_7 ~_~_(iO ._ N _: 629__3_6__! 7. W :
7..~_3_,_3_~ _N 6A_55__3_0 W
859.~o N 6~ 33. o w
.Lo_3_.%,~__.% N ~6 4~ 2 7 W
1086,94 N 67 0 34 W
1364,_Z_5 N 68 13 A~9 W ...
lbiZ+,96 N 68 35 ~0 W
1.., !:31
.' 0 '_3_9.-3
. . ~._437
l_,_6_iB
3 ._13j
..... 0,.>_3_6
0,328
7016
7443
29 4_5 ....... 5..~_5_0_,_7_.,4 _6.A~!+.:2 2 ..... N.7...3.~..0_C,_~. : 5.2_6._,_25_N Ld.:_7._,_IS__W. ........ _~_7.5_2_,..8/+_.N._5.9 .... 5 ..... D__W
28 15 6924,19 6867.,67 N70_,OOW 691,93 N ]~_8_3_3,44..W ...... 1~.5_~.,__~....6...N..6.9__.._I_9____25 W
ALL
RECORD OF
CALCULATIONS PF. RFORMED BY
,SURV.[Y
I, B ~V_L_F._LE_C_Tg~_'N_:LC C_O$_P__IJ_T_F._g ....
T D U F. D_O_Cz_LE.L
M~_A._S_,. _ .D_R_ J_F_T VERTICAL. SUB__DRIFT ........ TO T A ~;C 0__0 tR D INA T ELS D E P T H A,tl G L E D E P T H
S.E. & ........................ D I.R E C
D M DE_~_, __/:L ..... M s
7_7_8__9__2.7 1!_5I _7_ 2 ?)..Q.,_ 3.9... _7~1.J_:3..,..87 ......... N 69.:_O.O.~V_
___a...:~D_5__Z..7 .... _0.. _7..5.1..~....._6..~.__.Z~+_~.~_._:~.z ......... _N._.$_O_,_O_O_~j__ ..8._LO'__,..sA_~_ Z..i_!5_,_.Z~+ w 2,_~_6.5_,._Z_0 ,_N.._6_9._ :L_~__L~ :' __. 0.3_92. _ZZ.SZ...5.3
__8362:3t 15 7736,09 7679,57 NS.8,00W __8_7_~_,_7_~__N. ...... 2.2._'.23,,3_'J W 23~jT_:_4~6_8__~_Q__P._6__~Li__J._,_6_67 257.7_,25
.8~.~-.4..~-~--~-Q~_-~.9-7.?..~..~..5.~._~7.9..~.2...~..~4.--N-..5~6..'-~..~...w. 95_..5_,._2_..4.~ 2_3.__~_~_,.A:3 '~ .2..5~_Z._,.._5_0.. _N.. 6_.7_ 5_0_ 2_.~ ..W 0_,_2il .Z.5..Z..~_,_Z~
._ ~8.~-...8~~-.`~.~.-~.5--~.8.~.[;-~..'..3~7..~--~.~..2....3.?.8.5-~.5~.7`.~...~....~`..~. ..~....0_.2..3_!_8...3._._LN .~?..~__9_,...~_6 W 2.654,45 N 67 ~8 /+5 W
__9328 B3 l+5 8554.51 8498.09 N49.00W 1168.58 N 2~41.15 W 2888.1~ N 6_6 7 5_8_W ,,,. 0.~,
9945 29 ~_5 ..... '9..08 0.. ,_6.8_ ..9..0..2A._,3.6_ ~_3...,__093~___!_3_9_6_,_6.8___N2868,~6 W 3190,33 N 64 .Z A~_.W_ 0_.322 _.3_1..B.9,...9_9
10195 SO 0 ,9._2._~_7,46 92z+0 .9.4 N4Q,OO .14~9,93 N 2,950,._8_6 W ~O_9,_.~.6_B__N__.6_,3__l.~_;~_6..,W 0,316
............BOTTO~-.~-'~ ........... HOL:~--'~LOSUR~'"- ......... 3305,58' .................... FEET:-= ............ AT N 6~ 12 ~6 W
DEPTH
..
15 ? '~ 157 · 100 0 0 Q_,_Q_o_5. o
25'7 257. 200 0 0 0..0_0 ~,,
357 357. 300 0 0 0.00
~+ 57 ~+ 57 · 4O0 0 _0 .O_,_.i._~S.
-. 657 657, 600 0 0 _~_,._8..5 5 ...0.,_8.9. W
757 757, 700 0 0 3.i3 $ 1.27 W
857 857. 800 0 0 4.15 S 1.28 W
957 957, 900 0 0 5.10 S 1.32 W
1057 1057. 1000 0 0 5.78 $ 1.6~ W
1157 !157. 1100 0 0 6.08 $ 2.01W
1257 1257, 1200 0 O 6.31S 1.97 W
1357 1357, 1300 0
1~57 1457. 1400 0
0 6.64 S 2.02 W
0 6,73 S 2,06 W
0 6,8~ S 2.06 W
1557 1557, 1500 0
1657 1657. 1-600 .............. 0
1757 175-7',-'- 1700 0
0 6,86 S 2,06 W
0 6,94' S 2.06 W
1857 1857. 1800 0 0 7.40 S 2.04 W
1957 1957, 1900 0 0 8.15 S 2.11 W
. .
2057 2057. 2000 0 0 8.78 S 2.40 W
2157 '2157, ...... 2_~0.0 0 0 __8.99 S__ 2.40 W ~__
2257 2257. 2200 0 0 9.18
2357 2357, 2300 0 0 8,91S 1,36 W
2457 . 2457. 2400 0 0 9.19 S 1.14 w
.._
2557 2557, 2500 0 0 9.86 S 1.40 W
2657 2657. 2600 0 0 10.73 S 1.23 W
__
2757 2757. 2700 0 0 10.9~ S 0.66 W
2857 2857', 2800 0 0 1!.21 5 0.23 E
2957 2957. 2900 0 0 10.25 S 0.68 E
3057 3057. 3000 0 0 7.80 S 1.43 W
3157 3157. 3100 0 0 3.77 S 6.51
3257 3257. 3200 0 0 0.27 N 15.93
3358 33.~7,__3300 1 1 4.8.9 N 27.70
3459 3~57, 3400 2 1 10.76 N z+2.28
3561 3557. 3500 ~ 2 18.53 N 50.18 W
ME_ A_~..~ R E; D D E P T H A N D O T H E___.R__D..~._T_A~_ O__R _~ F.. R Y E Y E~N~0...0._.~E~_F_.._..,,,~,I.~_E_.A_.~._,T...t::L,,
TRUE
M E A $_U__R I~ D '
.
·
,V_E R T LC_&L S.U_B. _ M D- T V D
D E~_T__H_ _ _ SEAI;)_LF_EEJ!gS.C E
V.F.,_~,_T~ C: A L 01/411' OF
..... COPY
..
3664 3657, 3600 7 3
3768 3757, 33__00 !I 4
3874 3857, 3800 17 6
4203 ~,157, ~+100 46 ..................... !_2
4317 4257, 4200 60 14
4431 4357, 4300 74
4546 4457, 4400 89 15
4661 4557, 4500 104 15
4776 4657, 4600 119 15
4892 4757, 4700 135 16
5007 4857, 4800 150 15
:kO3_._SYm_W _.,
L72._,. 6~__W_
2.14__..03_W
..... 2_5...%,._8_9 W.
3_0.9_, i_L.=W. ....
__.~_.5_~_,_8_k__W.
{tkO.., s z w
462,10 W
5A3_~_Q6_w ................
............... 5.63_,.6..1 ...... w
613,89 W
5123 4957, 4900 186
5239 5057. 5000 3.8_2 ................................. !6
5357 5157~ 5!00 200 IR
3 .!_~_,_7_0__ N 66, 6 · 4 L W
_ __ 3._3..6.,_9,.3_N_ 72 0.,,.8. 9 .....
355 · 22 N. 78_0_.3
5&78 5257, 5__2_Q.Q _. 2,._2_2;!,... 21
5599 5357, 5300 242 21
5721 5457. 5400 25a 22
5843 5557, 5500 286 22
5963 '5657,
6083 5757~
6203 5857.
_6321 -
_ 6 43_9 fi_O_57 · 6_0.0.0 3.82
6 % 57 6153_, _ _ 63_00 .~0._0
663_5 6 291t 620.0 , ~l.&
.63_9_1 : &33.:L, ..... 6t0_0 ..... 4.3A
69D7 ......... fi_4J_7_, ..... 6_4_0D 4_5_0
7:~S
7252
560..0. ......3..0__6. ......................... 20__ 4 57,56 .N.. _i _!_ 0_ .8~, _6_..Z W
5700 3_2 6 2 0 ~y~_._~__7.._.._~ ........ IL7. ~_,.l_a_W.
__5 s o o 34 6 2 O_ ~_c2~_,33__N ....
1..8______ ............... 5_14_,..68__N ........ l 2_95.,._12__W.
5 ~'~ 3_,_91.__N .... !.35.-&,_99__W
5.53_,_8.3__N_----Lg_Lg_,.O_5__W
5_73_,_53~__N .... 1A32, Lg__W
59_2_,~__N .... l_5.29_,._L9_.W
6.i.0_,_1_7__N____.125_ 8_5.,.23_ ~-W.
62_7_,_21 ~
&~_L,2_0_iN ..... 169.4._, ~ 4__W ..........
661,65 IN 1747,24. W
. 6_7_9_,_5.6._J~1 ....
_~(,_82._N_ ........ 1~ 49_,_72 .... W
7_!_6_, 2_7__~L_____!..8.9.9.,_5.5__W
7480
7593
5_9_0.0 .%6 ~_
18
]-8
1.8
16
16 ,
6_5_5_7_,_: 6~.O_,O :: 4_.6.6 ............ !6
6 6.5.7. ._6_60..0_ _ A.~..] __ 15
6757. 6700 495 14
6.i%7... ...... 68.00__ 5_09__ 1_4
69 5 7. 6 900 ..... ~.2 3 L~_
70 5_7_,_ ~_ 7D.0_0. ..aD_6 13_ .
_~ N E A~U R ED___ D EF~_T H AN D_.~_~ E B D_A_T__~EO__R_.. E_V.~B_Y_..E_Y. EJ'i_.i.0D_F~~~ S.U.B._~A.~.T~,
TRUE
MEASURED' VERTICAL ~UB _~D-TVD__
DEPTH DEPTH SEA DIFFERENCE
7706 7157, 7100 549 13
7818 7257, 7200 561 12
793% 7357, 7300 574 13
8043 7457, 7400 586 12
8156 7557, 7500 599 13
8270 7657, 7600 613 14
8386 7757, 7700 629 16
754.71N .!9a~.._6.0 W
753,.~__N__
773,6~___~ ..... 2.0_~.3_,.9_~ ....
71~_,_D~__N.. 2..0.e..9_..~ .... ~ ......
850,27
881,30 N 2231,9~ W
8503 7857, 7800 646 17 914.08 N 2283,23 W
8620 7957, 7900 663 17 947,66 N 233g,16 W
8737 8057, 8000 680 17 981,73 N 2384.99 W
8855 8157. 8100 698 18 1015.78 N 2~36,70 W
8973 8257, 8200 716 18 I050,33 N 24~8,63 W
9091 8357. 8300 73~ 18 1087,31 N 2540,11 W
. ,
9210 8457. 8400 753 19 1127,02 N 2591,34 W
9330 8557. 8500 773 20 1169.31N 2641,99 W
9~50 86~'* ............ 8600 793 20 --1213,28 N 2690,88 W
9568 8757, 8700 811 18 1257,13 N 2736,49 W
9685 8857, 8800 828 17 1300.74 N 2778,88 W
- __
9801 8957, 8900 844 16 1343,93 N 2819.17 W
-.
9917 9057, 9000 R60 16 1386.50 N 285fl,86 W
10032 '9157. 9100 875 15 1428.56 N 2897,55 W
1014._~ __9_2_5_..7_.. .......... 9..2_Q0.. ....891 16 1471.92 ...... N ............... 2.9..3._5...59 W
........ R E ~ ME
TRUE
q E_A ,_~}2.R E D' V_E__R_T._I_~_~_.L._______.~.~ B
5000 4850. 4?93.
6000
_..7_O..0.O
9.000
7 41 8 · ....!_3.6..I ·
8279. 8223.
10000
9128. 9071.
T 0 T_A_L..
_5_._~.7_ __5. ..... 2.._~. 0
9 · ~...6_5 O_o_O_4__E
.... 7_8__:~_ N
289.44, __N___610.79 W
"t ~ , ,
._Lo_~_s · 56 N .2_!.O_O_.._z+z+ W
-::/':: '~- - ~ ' :' } 0~ ..... '-' i ............ i ....... . ....... 1' ...... ~ ..... :'-'~ i :":- : .... ~ " ,, .' ~
, i ' ' ~ - -' ~ ...... ~: ........ ' :"; ........... : ~ ........... ; ........... [' ................. SCALE I."500' ' ~ ' -:' 'i .... ·
............... , ...................... i .........B.~ ALASKA INC.- -: ~ - ' ·
........... ~ ............ i- ........... ~ ............ MAGNETIC SINGLE-SHOT
...... ~ ...................TMD ='iO~195'" - t ............ ~ '~ ......
...... _ ..... ~-~ ........ ~ .......... 9~~-~ ...... ~ .... ~ ' ..~ ~ ........
- ; .... ~ ............ ~ ............ ~ .......... t ......... ~ - . ...............
~ , ~ : - . _ : -.
- i ; ..... ;. .................... . ............................... ; .............................
, { , . ~ .... i ....
.............................................. i ................. ~ ........................ ~ ............................... ~ .......... ~..- .....
:::::::::::::::::::::::::: :.':.:::: .... ~ ........................................... ~
{ ............ ~ ......................... { ..... , ~ ~
.......... [-'-': ......... ~ ....... ~ ...... :-- : ...... . ALE~'-~DEP-THS"SHOWN[ ~ ~ i · ~ :
........ -~:~ -:-;' ..... :~::::~:. :_~..~:~::.~-:~':. ARE TvD.- ........... ~' .......... '. ....... i~ ............ ~ .......... ;.: ............. ......... : ........... i-; ....... ............. : ...........
~ -- _
'-- ~ ....................... ~ ........... ~ ........................ : .... ~ ..... i
.......... ~ ...................... .J . - __~ .
.......... , .............. . ............................. ~ ~ ................. ~ . .
' i ..... ~ .......... ~ ~""~ ............................... '
.
, . ] , ' ~ 'I - , · . , ~ - ,' ~ ,
_ ......
1 ~ ~ ........ ; ............
- ~ ,---~ ............................ ~ ................................. : ................
....... : ........ :'~ ~~5. ~_._-'~. _ _ ~-_ - ...... . -. ...... . .... ~ ......... ~ .
_ ..... ~_ : _ALL. DEPTHs.'SHOWN ._
' ' .... ~ ' ' -~ .......... ~ ......:-~--' ..... ' ............... : ARE-TVD.
............. ~..=_L_L_:J_L_:._~..,._:,..: ...... :__. - ........... ~_ ............. ;.~',~:'__./?.-'_5_L:.~-.~.:.7~ '. ........... . .
~ ' I '. ; ~ ..j'~__~.-~.'~ ..... '~[' ..~..~ ~.~_..'j ~ __ ~_ '__ .......
- , -- ;_ -. ~ .... :.~ : ..... ~ ...................
..... ': ..... ~.. ~ ...... _.: _ ~ .... -_:..: : ....::_. ; .... .... · ....... ~ .... , . : ..
.... '--~ ................... : .......... ~.--: ..... ~ ....... ! .... ~-: ..... : :.~-~--:-: ..... ~ ........... ~ ......... : .... ' .... ~ i -
_._:~: :_~_.~_: ......... ~ ........... ~._~N. ............... ~ ...... ~_. .... ~ ............. ~ ........................ ~ ............................... ~ .................
...........~ .............. - i~ ............................ · - ~ ' ...... ~ ~" ~ ..... ~ ........ . :: ........ ' .... I~ ..... ' ......
.... ~ - ~ ........ :' ~ ....... 1 .............. 7'~ ................. i ..... ....... : ................... ~ ........ ~ .....
............ ~ '"":' ~ ....... ~ ............ ~' ..... ._,_ _~ .......... ~ ....... ~S~__~ ...... 1.-" -- .~ .... -~ ....... ~ ...... · ..... ' .................... ........... ~ .............. ~ .............. L ....:--
._ :..__~ ....... ~ . i .... : ..... ~ :.~ ........... ~ ..... L: .....~. ........ ~ ~_ . _ t .... ~. .... : i .....
......... ~ .... ~.~. :-- '~:'I ...... : ...... ~ ............ ~ ....... :-- ~ -'-~- ' · ~ ....... ~' ~ .......
-~-.~'~:':~--'~.~'~'-'~-~-~-~':~':~-:~-~:~---~:-"~-~-'- "~ ...... ...... ..~_~ ...... ~~-~_'~.--_ .... .~,~....~ ............ ....... ~..~ ~ ~~ ...... .......... .... ~ ...... ..~.~ ~..., ...... ..~ ...... ....... ~. ,,---. ....
.......... ~ ................ ~ ........ . ........................ ~ ~.:-.--.
._.:_ ...... ~ ................. ~ ....... ~ z..: ....... ' ..... ; ' , ' ' '~ :; .... I ....
............ ~- .... ~ ..... ............. ~ ............... - ....... ~ - ; ~ . : ~ .... . .
I--~
...... : .... ~ '' ~- ~ ....... ~ ' : ........... i ' '
'~-~:~.,.~:'~::~-~:~':::::~, . , .. ~?~C~-~ i'-:'-~'--?. ..... '-7%~ ' ...... ~-~;~-~ ...... _.-~:-~'--'.-'-~ ?~"-~":~:~ '- ~"~--'~':'-~ .... ~..' .....
........ ~-:'"',-~ ..... ii" ~'-~ ...... ~ ....... :'- - ............. ~' .... :_ '
....... ~-----?.~ .......... _. :---~ .......... ~._:--: .... ~-. ~ i-.~ ~-_ ..~ ..... ,~-'- -~ ~' :--' ........ ~ -- - ~ ....
...... ........ .__, ........ ...... ........... . _~~--_.--..~~._ ~ .... ........... .........
'~i~~~ -~~ ...... ~'~~'~--'~ ...... ~ .... : .... ~ .............. ? ................ ~ .........
~.~:.~.~:~-~---.~-~.:~-~ ...... ~._~._~ .......... ,.~.., .... , ~ ..... ......... ~ .......... ,~. ..... ..... ..... .. ..... ~. ~
...... ~_ 'T'-'~ ............. ~ ..... i' ............... : ....... ~ ......... I .... ~ .... : ~ ..... ~ ......... . ..............
7.' -_~L_~L~ .....L L_~ ......... _ ~_~L~ ...................... ~,____~.L.,_L_L ......
~.~~ ~ ~ ............ ~ ....... ~..__, ._.-~'~---~ .... ~ ~--.--~-~-~~- : ......................... ~ .................. , .........
..... '~ ..... ~ ............ :--' .................. t ......... : ~ -- ' ....... -- . ~ ' .... ~ - .
:_.'::~_ .:.::_:: :~_::::_..~:.:L-'.:-~ ..... : ...... ~ ............. I ....... ~ . ._~ ....................... . .. _~ ~ ............ ~. · .
~::~~:~~:~ -'-. .~", :~, ~ ~ : ............................ . .: ................. . .............
. - ........... 7 ..... : ...... i-- ....... ~. _~
. ~ . ~ -. ~ ....... ~--- ~
...................... ~ ~ ......... F T V D = ~ ~'" .. ..~
'-- ~ ......... T~D = IO~l ~5~ ................................................
I t '
........ ~ ..... ~ ~ ...... ~ .............................. ~ - : ........... ~ .. .
........ ~ i ..................
Atlanti%.;j.chfieldCompany North Amer?'"~ Producing Division
North Alaskt, ._4strict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
February 25, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
RE' E-4 (31-12-14)
Permit No. 75- 70
Dear Sir-
Enclosed please find the Monthly Report of
Operations for the above-mentioned well.
Yours very truly,
C. R. Knowles
District Drilling Engineer
CRK'cs
Enclosure
FEB 3 ? 1976
SUBMIT IN DUPLICATE
For~. P-4
REV. 3-1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND' WORKOVER OPERATIONS
5. AP1 NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME
OIL ~] GAS ~]
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Atlantic-Richfield Company Prudhoe Bay
3' ADDRESS OF OPERATOR 9. WELL NO.
P. O, Box 360, Anchorage' Alaska 99510 E-'4 (31-12-14)
4. LOCATION OF WELL
At sUrface:
1153' SRL, 502' ~EL, Sec. 6, TllN, R14E, UPM
10. FIELD AND POOL, OR WIL~AT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
February, !976
Drilled 8-1/2"hole to'10,195', droppedmultishot. Ran open hole logs. Ran
37 jts. 7" 29# N-80'Buttress casing with shoe.at 10,195', PBR at 8611'. Cemented
with 593 sks. Class 'G' cement, Cleaned out to 10,141', tested lap to 3000 psi,
okay.. Ran inflow test with 3580 ft. mud cushion. Displaced top 2500' to diesel.
Nippled down BOPE, installed and tested tree. Released rig at 2400 hrs., February
6, 1976.
FEB 2, 7 1976
14. I hereby certify that t_he fo/egoing is tr~e and correct ~, . ~
NOTE
-Repor on is orm is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation,committee by the 15th of the succeeding month,unless otherwise directed.
AtFanticRi~hfieldCompany North An'/'"':an Producing Division
Nort. h Alaska District
·
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
February 19, 1976
Mr. o. K. Gilbreth
State of Alaska
D~partment of Natural Resources
~±v, ision of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
~; F~4 and E~-5
Dear Sir'
Enclosed please find Sundry Notices showing a
correction in the lease name for the above
mentioned wells.
Yours very, t ~ruly,
C. R. Knowles
District Drilling Engineer
CRK:jl
Enclosure
Fprm 10-405
, RE:;~..,1-10-73
~.-
Submit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRy NOTICES AND REPORTS ON WELLS
(Do not use this form for proDosals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
1. OIL ['~ GAS . D
WELLiz~ I WELL OTHER
2. NAME OF OPERATOR
Atlantic Richfield Company
3. ADDRESS OF OPERATOR '
P. O. Box 360, Anchorage, Alaska
4. LOCATION OF WELL
At surface
5. APl NUMERICAL CODE
50-029'20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay
9. WELL NO.
99510 E-4 (31-12-14)
1153' SNL, 502' WEL, Sec.. 6, TllN, R14E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 56.52' AMSL'
Check Appropriate Box To Indicate Nature of N~3tice, Re
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
)ort, or Other Data
NOTICE OF INTENTION To:
TEST WATER SHUT-OFF L---J PULL OR ALTER CASING
FRACTURE TREAT ~ MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Correct lease name
SUBSEQUENT' REPORT OF:
WATER SHUT-OFF E~ REPAIRING WELL
FRACTURE TREATMENTH ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results Of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
'starting any proposed work.
This is to inform you that the lease name for the above named well is Prudhoe Bay.
16, I hereby certlfy that ~~l~ue and correct
SIGNED ~ .~.~I ~,. ~/~ ~. J TITLE .~~~f ~~
(This space for State offl~u~) _ /'~) -~
APPROVED BY ~/~ ...... ~' L ', ~ ~L~¢L TITLE
See Instructions On Reverse Side
DATE
· Approved Copy
Returned
AtlanticRi.chfieldCompany North Amer[~/~Oroducing Division
North Alask, 5 ~trict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
February 13, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Permit No. 75-70
Dear Sir:
Enclosed please find a Sundry Notice describing our
plans to suspend the above mentioned well.
Yours very truly,
C. R: ~ow!es
~istrict Drilling Engineer
CRK: cs
.Enclosure
Form [0-403
REV. 1-10-73
Submit "Intentions" in Triplicate
& "Subsequent Reports" in DuPlicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
· SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
1. OIL [~ GAS ["]
WELL L.--J OTHER
WELL
~- NAME OF OPERATOR
Atlantic Richfield Company
3. ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska 99510
4, LOCATION OF WELL
At surface
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 56.52' AMSL'
z4. Check Appropriate Box To Indicate Nature of Notice, Re
,m m,o-
ABANDON*
REPAIR WELL · CHANGE PL'ANs
(Other)
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Put River
9. WELL NO.
E-4 (31-12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
3orr, or Other Data
SUBSEQUENT REPORT OF.'
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR AcIDIZlNG ABANDONMENT*
(Other) ,
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
After assessing results of cores and logs, we plan not to perform the drill stem
test proposed in Form 10-403 of January 30, 1976, but to continue with the'suspension
of the well.
16. I hereby certify that the folegolng Is true and correct
"-"-il -
'
See Instructions On Reverse Side
DATE
Approved Copy
Returned
Atlant~hfieldCompany
North Amer3'"~{n Producing Division
North Alas~ ~istrict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
February 12, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
E.-4 (31-12-14)
Permit No. 75-70
Dear Sir:
Enclosed please find the Monthly Report of
Operations for the above mentioned well.
C, R. Know!es
District Drilling Engineer
CRa:j1
Enclosure
~" SUBMIT IN DUPLICATE
Form No. P-4
REV. 3-1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
WELLIAI WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Atlantic RiChfield Company Put River
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 36'0, Anchorage, Alaska 99510 E-4 (31-12-14)
4. LOCATION OF WELL
At surface:
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
10. FIELD AND POOL, OR WIL~AT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
January, 1976
Set 20" 94# H-40 conductor at 104' BKB and cemented to surface with 100 sacks
Permafrost cement. Spudded 0000 hrs., Jan.. 6, 1976. Drilled 18-1/2" hole to 2850'.
Ran 13-3/8"-72# N-80 Buttress casing to 2840'. Cemented to surface with 4260 sacks
Permafrost cement. Nippled up and tested BOPE. Cleaned out to 2865'; ran leak-off
test. Directionally drilled 12-1/4" hole to 9155'. Ran multishot survey. Ran
SchlUmberger logs. Ran 9-5/8" 47# N-80 Buttress casing with shoe at 9131', and PBR
at 2104'. Cemented with 931 sacks cement. Cemented lap through FO at 2844' with
250 sacks Permafrost C. Tested lap;.gailed. Squeezed lap with 250 sACks Permafrost
C. Tested lap to 3000 psi. 'Drill.ed out shoe'and presSure tested to.L0..7.psi/ft.
Directionally drilled 8-1/2" hole to 9945'. Cut 2 cores to 10,043','recovering 95'.
Drilled to 10,170'.
14: I hereby certify that~the forgoing is tq/te and Correct ~__~/C~-~ ~/ ~7
SIGNEDC~~.~ ..... TITLE _ . ~~ DATE / 6
NOTE-Repo. on this ,orm is required ,or each calendar month, regardle. Z~e~7~u~ operation, and mu. be filed in du.,,cat, with the
oil and gas conservation committ~ by the 15th o~ the succe~ing month.unl~ otherwise dir~t~.
bPALASKA iNC-
3111 C STREET · TELEPHONE {907) 279-0644
Atlantic Richfield Company
P. O. Box 360
Anchorage, Alaska 99510
Attention: Mr. C. R. Knowles
District Drilling Engineer
Gentlemen:
Well E-4 (31-12-14)
January 30, 1976
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
Enclosed, in triplicate, for submittal to the State of Alaska, is
Form 10-403, Sundry Notices and Reports on Wells for the subject well.
This report contains our intention to core the well and perform a drill
stem test, if required.
Very truly yours,
BP ALASKA INC.
P. R. Judd
District Drilling Engineer
PRJ:cmc
Attachment
cc: Well File
Re~,med
Form 10-403
REV. 1-10-73
Submit "1 ntentions" in TriPlicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
~' O,L I-'41 GAS l---I
WELL '1~.1 WELL OTHER
2. NAME OF OPERATOR
Atlantic Richfield Company
~. ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
At surface
1153' SNL, 502' WEL, Sec. 6, TllN, R14E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, et~)
KBE 56.52' AMSL
14.
CheCk Appropriate Box To Indicate Nature of Notice, Rel
5. APl NUMERICAL CODE
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
kD.l. 28299
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Put River
9. WELL NO.
E-4!~ (31'12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay,' Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
)oft, or O:ther Data
NOTICE OF INTENTION TO:
SUBSEG[UENT REPORT OF:
FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ABANDON* sHOOTING OR AClDIZING ABANDONMENT*
REPAIR WELL CHANGE PLANS (Other)
(Other) (NOTE.. Report-results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
1)
2)
We plan to core the subject well, beginning January30, 1976, from a depth of 9945'
to 10,065'+.
If warranted, depending upon resultsof cores and logs, we plan to perform a drill
stem test, approximately February 4, 1976, after running.and cementing the 7"
liner. Perforations will be shot within the 7" liner in the lowerSadlerochit
sandstone. The exact depth and.interval of the perforations to be determined from
the cores and logs, and reported'by subsequent'.Sundry Notice. At completion of the
DST, a bridge plug--will be set above the'perforations, prior to suspension of the
well.
16. I hereby certify that the
(This space for State office use)
APPROVED ElY ITLE
CONDITIONS OF
See Instructions On Reverse Side
DATE Z ~,~' ' 7A
APproved CoP~
Returned
AtlanticR~hfieldCompany
North Ame~ Producing Division
North Alaska. ,strict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
January 27, 1976
Mr. O. K..Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Permit No. 75-65
Dear Sir:
Enclosed please find a Sundry Notice containing our
proposal to suspend the above mentioned well pending
construction of surface facilities.
C. R. Knowles
District Drilling Engineer
CRK:jha
Enclosure
I Di,'.AFT
CONFER:
FILE:
1976
DWiS!ON OF OIL AND GAS
ApprOved Copy.
Retumed
Form 10-403
REV. 1-10-73
submit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
2. NAME OF OPERATOR
--Atlantic Richfield Company
3. ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska
4. LOCATION OF WELL
At Su trace
APl NUMERICAL CODE
50-0.29-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28299
7, IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Put River
99 g-4 (31-12-14)
: :' ~10. FIELD AND POOL, OR WILDCAT
Z9 I976 Prudhoe Bay, Prudhoe 0il Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
1153' SNL, 502' WEL, Sec. 6, TllN, R14~I¥t~J~ OF OIL AND GA~-
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 56.52' AMSL
Check Appropriate Box To Indicate Nature of Notice, Re
14.
Sec. 31, T12N, R14E, UPM
12. PERMIT NO.
75-70
)orr, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other) Suspension
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF [~ REPAIRING WELL
FRACTURE TREATMENT~ ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or RecomPletion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
Current Status:
Surface Casing:
13-3/8" 72# N-80 Buttress casing at 2840' MD. Cemented to surface.
Intermediate Casing: 9-5/8" 47# N-80 Buttress casing at 9131', cemented to top of liner
at 2104'.
We propose to suspend the subject well pending construction of surface facilities. The
well status will be as follows:
Total Dep_.th:
Approx. 10,310! ~, 9360' TVD.
Last Casing:
7" 29# N-80 Buttress casing from TD to approximately 8600' MD,
which will provide an overlap of approx. 500' inside 9-5/8"
casing.
To be cemented with approx. 2.50 cu. ft. Class "G" cement.
16. I hereby certify that the foregoing is true and correct
SIGNED , , i . . ~ ~
(This space for State office use)
CONDITIONS Of ~OVAL, IF ANY:
See Instructions On Reverse Side
Approved Copy
Returned
~~~,~.H ;"~,. ~ . . ~'' ,,. .
' - II [ III Ir
02~0] B
of ALASKA
DEPARTMENT OF NATURAL RESOURCES ~
Division of Oil' and Gas .....
[--0 Gilbr
TO:.K. eth, Jr
Director
Hoyle H. Hamilton .
Chief Petroleum Engineer~
FROM: Russell A. Douglass
Petroleum Engineering .Consultant
DATE ~
·
·
SUBJECT:
January 16, 1976
. .
Witness BOPE test, BP water
.~.injection well GC- lA, and
BP well E-4.
January 7,_ 1976 - Flew to Prudhoe Bay from Anchorage arriving at 12:30 PM. Purpose
of my trip was to witness BOP£.testing on BP .wells. GC-1A and E-4~
Tal'ked with Brian Rose, BP d~jlling forenmn,, shortly after i checked into the BP
camp. He is drilling the GC-IA well on the Nabors 1SE ·rig.. He .expected to start.
testing around 8:00 PM this evening
Arrived on location at 8:00 PM.' ~. Started BOPE testing a~ ll :30 PM. Tested top pipe
rams and hydril to 3000 and 1.500 psig respectively. ~ Looked at the accumulator and
noticed that the nitrogen back up bottles weredown to 1000 psig. Someone had inad,.
vertently left the valves on the bottles.open and the. pressure had equalized across
them. Brian said he would try .to locate some more bottles.
January 8, 1976 - Continuing With BOPE .testing. ·Tested lower pipe rams, wing valves
and check valve on the kill~line, wing valve and HCR on the choke line, and the lower
kelly valve to 3000 psig. They ·do not·have an upper kelly valve. Tested the blind
rams to 3000 psig. Attempted ~ to test.the choke manifold. There was a U in the choke.
line which had collected water· and was fr. Ozen solid. ~Shut down to unfreeze line.
Pressure was being applied by~ .rig..pumps..
Tested choke manifold to 3000 psig all valves and ~flanges held with no leaks. Mani-
fold was filled with diesel .prior..~to testing..Completed test at, approximately 6:00 AM.
Completed a field inspection'report. ~ Gave original to. Brian Rose, sent one to Swede.
Swenson in Anchorage and a :copy,..is attached, Returned ~.to BP camp 'to await a call from
the E-4 wel 1 si te. .
Januar..y 9, 1976 - Garland G°OdwYn called, f. rom Brinkerkoff Rig 36, on well E-4, about
7'i'O0"'AM'-' He picked me up and.~took .me .to the Well. site. They were.having some problems.
The casinghead .connection had..leaked and they were. preparing to weld over the connection.
While they were gathering the. necessary equipment we tested the BOP stack.
Started t~st at 5:00 PM. Bottom pipe .rams .leaked, top rams ,held and the hydril leaked..
Garland said they would change out the rubbers in.. the lower rams and. we would retest
the hydril when the welding ,was complete. Wing valves on the choke and kill lines also
tested, to 5000 psig. .. .....
·
·
Field Trip Report
Russ Douglass
January 16, 1976
Tested the ten valves on the choke manifold to 5000 psig with no leaks. Also tested
both floor valves and lower kelly valve to 5000 psig. Upper kelly did not hold
pressure. They did not have repair parts nor a spare valve so Garland called in to
have one-sent from Anchorage. Shut down for the .welders.
J. anuary. 10, 1976 Had ~reakfast with Garland at the BP camp and then went to the
E-4 Well s(~te at~ ~:00 A~I. Tested pipe rams (lower} to 5000 psig and the hydril to
2500 psig; both held. Tested the welded casinghead to 3000 psig; test okay. 'Filled
out the field inspection report and gave original to Garland, sent a. copy to Swede
Swenson in Anchorage, and a copy is attached. I told Garland. I would check with him
concerning the upper kelly valve before I left Prudhoe.
January. ll, 1976 - Talked with Garland this morning at about 9:00 AM. He informed
me they had received a new kelly-cock and were replacing it at the moment, then they
would test it to 5000 psig. I gave him the ok.
In summary, I witnessed BOPE testing on BP wells GC-1A and E-4. Well GC-1A had a
problem with the nitrogen bottles on their accumulator backup system and well E-4 had
an upper kelly valve that would not hold pressure. Brian Rose ordered some more
nitrogen tanks for the GC-1A well and Goodwyn replaced the kelly valve on the E-4
well site.
Attachment
RAD :bjm
---22:
Ki1-1.-Li
.~:-:f.,~'t':(:? -) .. : .-.. (:":-)i:r:":' ": .... ~ ' --"' ~ ~.:; ChOkes . -
,'-.??-.:(-) (--")?,-?' 8,' Hl
.11.-P&AMarker ' ; : - '(~. (-:) 28, Pipe Rams' ~ps]g - .. -.
( ) ( ) ]3.'Clean-up. ' -
( ~( ~'- ]~ Pad ]~v~]~d
' "~ ' ' observation tii, e /~"hrs/da~s Total. n~mber leaks and/Or equip.-failures .' '~ ...
Total inspection .. . ~-...,. ,. , F : , - .: ,, - ~.(~ . r ~ 7 ' ·
,.. ..~, , .. ~ ~ ~ ''..- ~- . ~- ~. . ~ .
Rema r k
Cc flotif~ in / da~ or:~hen readY.'.~ In;speared b "Da
DEPARTMENT OF NATURAl,, RESOURCES
!
DIVISION OF OIL lIND GAS / 3001 PORCUPINE DRIVE-ANCHORAGE 99501
/
JAY S. HAMMOND, Covernor
November 20, 1975
Re: Put River E-4 (31-12-14)
Atlantic Richfield Company
State Permit No. 75-70
C. R. Knowles
District Drilling Engineer
Atlantic Richfield Comapny
P. O. Box 360
ANchorage, Alaska 99510
Dear Sir:
Enclosed is the approved application for permit to drill the above referenced
well at a location in Section 31, Township 12N, Range 14E~ UPM.
¥~ell samples, core chips, and a mud log are not required. A directional sur-
vey is required.
Many rivers in Alaska and their drainage systems have been classified as
important for the spawning or migration of anadromous fish. Operations in
these areas are subject to AS 16.50.870 and the regulations promulgated there-
under (Title 5, Alaska Administrative Code). Prior to commencing operations
you may be contacted by the Habitat Coordinator's office, Department of Fish
and Game.
._
Pollution of any waters of the State is prohibited by AS 46, Chapter 03,
Article 7 and the regulations promulgated thereunder (Title 18, Alaska
Administrative Code, Chapter 70) and by the Federal Water Pollution Control
Act, as amended. Prior to commencing operations you may be contacted by
a representative of the Department of Environmental Conservation.
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department
of Labor is being notified of the issuance of this permit to drill.
To aid us in scheduling field work, we would appreciate your notifying this·
office within 48 hours after the well is spudded. We would also like to be
notified so that a representative of the Division may be present to witness
testing of blowout preventer equipment before surface casing shoe is drilled.
In the event of suspension or abandonment please give this office adequate
advance notification so that we may have a witness present.
Very truly yours,
Thomas R. Marshall, Jr.
Executive Secretary
Alaska Oil and Gas Conservation Committee
C. R. Knowles 2-
November 20, 1975
TRM-bjm ·
Enclosure
cc' Department of Fish and Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Department of Labor, Supervisor, Labor Law Compliance
Division w/o encl.
AtlanticR, ichfieldCompany North Amer!paq., ProduCing Division
North AlasK strict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
November 17, 1975
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
F -4 (31-1 .-14)
Dear Sir'
Enclosed please find the following documents in
triplicate plus the $100 filing fee'
1. Application for Permit to Drill Well E-4
(31-12-I4).
2. Proposed Drilling Program Outline.
3. Surveyors' Plat showing well location.
Sincerely,
C. R. Knowles
DistriCt Drilling Engineer
CRK: alh
Enclosures
NC.
- - STREET · TELEPHONE {907) 279-0644
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
November 12, 1975
Attention: Mr. O. K. Gilbreth,
Director
Gent 1 emen:
Well BP E-4 (31-12-14) - Bottom Hole Location
We have received a copy of ARCo's application for Permit to Drill Well
E-4, and this letter serves as our statement of non-objection as
required in Paragraph 22.050, Title II, Section 3 of the Alaska
Administrative Code.
Very truly yours,
BP ALASKA INC.
PRJ:vjp
cc: Well File E-4
Atlantic Richfield Company
G. D. Taylor
Manager Operations
~ OF OIL AND GAS
Form 10.401
REV. 1-1-71
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR DEEPEN
SUBMIT IN TRIP[ :.
(Other instruction.
reverse side)
la. TYPE OF WORK
DRILL [~
b. TYPE OF WELL
OIL ~ GAS
?I~LL .|'}' ! WELL .Fl OTHER:
2. NAME OF OPERATOR
Atlantic Richfield Company
DEEPEN
SINGLE
. ZONE. []
MULTIPLE
ZONE [-']
3. ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
At surface 1153 } SNL 9
502' WEL, Sec. 6, TllN, R14E, UPM.
At proposed vrod. zone
B855' TVD, 3380' WEL, 200' NSL, Sec. 31, T12N, R14E, UPM
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
.... 10 miles from Deadhorse.
50-029-20184
6. LEASE DESIGNATION AND SERIAL NO.
ADL-28299
7.IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
Put River
9. %roLL NO.
E-4 (31-12-14)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11.SEC., T., R., M., (BOTTOM
HOLE OBJECIIVE)
Sec, 31, T12N, R14E, UPM,
12.
14. BOND INFORMATION: State of Alaska
· WE Blanket. SmetyandforNo' 80113840 Federal Insur. ance Co.
Amoun,~ $100,000.00
15.LOCATIoNDISTANCE FROMTo NEAREsTPROPOSED'* ~.'>mn,,,, , ~,xT ,.~.,-¢ L,~as,~,... ,~ 28304 .116. No. OF ACRES tN LEASE .
' 2459
PROPERTY OR LEASE LINE, FT. ' ' .
(Also to nearest drip., unit, if any)
18. I~'ISTANCE'FRoI~ PROPOSED LOC~TION ' ' '} 19. PROP~Si:D DEPTH
TO NEAREST WELL DRILLING, COMPLETED, [
OR APPLIED FOR, FT ....
4800' from Well E-1 (32-12-14)., [9360' TVD 10,.310' MD
2I. ELEVATIONS (Show whether DF, RT, CR, etc.)
Est. KB = 55' AMSL
17. NO,ACRES ASSIGNED
TO THIS WELL
320
20. ROTARY OR CABLE TOOLS
Re tary
22. APPROX. DATE WORK WILL START
December 12, 1975
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE ~ZE OF CASING WEIGItT PER FOOT GRADE ,. Vl~:. · .... ....
' ' ~ , ......... T EITING DE~t~ ' ' ' Quantity of cement
..... ~8i'iw ..... 13'~"-'r'=72~ .... N-BO .2850 2850 "4500 cu. ft.
",.,,12~'' ''~ ' 9~" . ,,47#, ' N'80r 8380 "9110' "30'00 cu. ft.' ' '
-_ ,,' 8~" , .7". , ,- '29# ..... ~280 '9360 10,.310 ..... 280 ,c~.'ft., .' ' .'~ '
See attached summary.
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: [f proposal is to deepen give data on present productive zone and propdged
new productive zone. If p~oposal is to drill or deepen dkectionalty, give pertinent data on subi~face locations and measured and tree
vertical depths. Give blowout preventer pro.am.
24. I hereby certify that the Fo~egging is Txue andJ~orrect
SIGNED. . .. .. . .
(This space for State office use)
SAMPLES AND CORE CHIPS REQUIRED
[] Y~S ~] ~o
DIRECTIONAL SURVEY REQUIRED
CONDITIONS OF APPROVAL, IF ANY:
MUD LOG
[] YES ~] ~0
OTHER REQUIREMENTS:
A.P.I. NUMERICAL CODE
50-029-20184
PERMIT NO 7.5-ri70 ~ . __., , , 'APPROVAL DATE .... 1. l-20-75
*See Instruction On Reverse Side
WelI Number E-4 (31-12-14)
P_rop°sed Drilling Progra__m
Dry bucket'26" hOle to about 80 ft. below ground level and cement conductor
to surface using Permafrost II cement.
Drill 18½" hole to about 28510 ft. and cement 13~" casing to surface using
4500 cu. ft. of slurry.
Drill 12¼" hole under directional conditions to approximately 5380 ft. TVD.
QS!t
Cement ~ casing in stages with 3000 cu. ft. of slurry.
Drill 8½" hole under directional conditions to T.D. at approximately 9360'
TVD. Cement 7" liner to approximately 500 ft. inside of 9~" casing shoe
with 280 cu. ft. of slurry.
Blowout preventer program consists of three 5000 psi W.P. ram-type and one
annular-type blowout preventers from the 13~" casing point to T.D.
At suSpension top ~2500' to be' displaced'i t°, dieSel.
O4
L~... :5960'
--
~____,eY LAT. =i 70o20,28.25,'
LONG. =i1_48° 5 9_'51.6:5"
X= 6614,577
387' Y =5,976,164
5
O2
O3
O4
02
03
04
(Proposed)
- ' 7
1580' .
e
I
I
I
I
I
CERTIFICATE OF SURVEYOR
E- 3 (Propos
I
I
1
I
I
I
Jr T. 12 N
I
E PIT
i
,, , ~NE COR. PAl)
3(-$2-12-/4)
SUMP
,~4- -/2-/4 )
2(~ 6 //-/4)
.
PAD DETAIL
Scale I" = 400'
PORTION OF TIIN., R. 13 & 14 E.
scale I"= I/2 Mile TI2N.,R.13 &I4E.
I hereby certify that I am properly registered and
licensed to practice land surveying in the State of Alaska and
that this plat represents o location survey made by me or
under my supervision, and that oll dimensions and other
details are correct.
~-~-,~ - ~,~-l-z..
Date
SURVEYOR
~..
F,
ADDED E-4(PROPOSED)
REVISED E-$(PROPOSED)I& WELL HOLE NUMBERS
REVISED WELL HOLE NUMBERS
REVISED (PROPOSED) E- :~ LOCATION
ADDED (PROPOSED) E-4
REVISED E-I AND ADDED (PROPOSED)E-3
,TOP SADLEROCHIT (PROPOSED) E-I,E-2 8800'SUB-SEA ELEV.
I
ii/~ o/75
~o/a4/75
~o/2o/75
10/ 2/75
9/24/75
8/5/75
C.J.R.
C.J.R.
CJ.R.
C.J. R,
C. J.R.
C.J.R.
C,J.R.
M.L.S.
PAD"E"
Located in
NE V'4 PROT. SECTION 6j T, IIN.~R.14E. UMIAT MERIDIAN~ ALASKA
Surveyed for
B P ALASKA INC.
I
Surveyed by
F.M. LINDSEY I~ ASSOC.
LAND I~ HYDROGRAPHIC SURvEYors
2§02 West Northern Lights Boulevard Box 4-081
Anchorage · Alaska
CHECK LIST FOR NEW WELL PERMITS
Company /~F~O
Yes No Remarks
I. Is the permit fee attached ................ - .... X/~a~
Lease & Well No. ~A~ ~iVm_]/' ~-c/_
_~. Is well to be located in a defined pool .............. /~
]. Is a registered survey plat attached ................
~. Is well located proper distance from property line .........
5. Is well located proper distance from other wells ........ ~J~
6. Is sufficient undedicated acreage available in this DO01 .....
7. Is well to be deviated ....................... .A~F,
~ ~-..,o operator the only affected party .............. · ~:~i~~
9. Can permit be approved before ten-day wait ............. ~ ~
O. Does operator have a bond in force ................. ~/~C
1. Is a conservation order needed ....................
2. Is administrative approval needed .................
3. Is conductor string provided ............... ~ .....
~. Is enough cement used to circulate on conductor and surface '. ....
5. Will cement tie in surface and intermediate or production strings .
11 cement cover all known productive horizons ..........
17. Will surface casing protect fresh water zones ...........
~. Will all casing give adequate safety in collapse, ten~ion & burst
i9. Does BOPE have sufficient pressure rating .............
\dditional Requirements'
Approval Recommended'
Geology Engi neeri n~'
TRM HWK X~ OKG
JAL ~7
~HHH
LCS ~.7~x J CM
Revised 1/15/75
Well Histow File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information: of this
nature is accumulated at the end of the file under APPENDIXi
.,
No 'special 'effort has been made to chronologically
organize this category of information,
~~ ~ E - 04
~'~'~ ~ ~°"~' ~°m~~UDHOE BAY
Run 1'
12 - April - 1995
PDK-1001GR
Cased Hole
0102
WESTERN
ATLAS
Logging Services
~ape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
E - 04
500292018400
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
20-APR-95
6225.01
K. BRUNNER
P. ANGEL
6
liN
14E
1154
502
56.52
28.60
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
9.625 9131.0 47.00
7.000 10441.0 29.00
5.500 8573.0 17.00
3.500 9817.0 9.30
BASELINE DEPTH
9371.5
9372.0
9415.5
9435.5
9437.5
9480.0
9509.5
9522.5
9527.0
9551.0
9563.5
9605.5
9650.0
GRCH
9369.0
9369.5
9413.5
9433.5
9434.5
9476.0
9509.5
9522.5
9527.0
9551.0
9562.5
,9607.5
9648.0
EQUIVALENT UNSHIFTED DEPTH
DENS
GR
2
1
05-JAN-76
SWS
9652.5
,
9686.5
9710.5
9720.0
9721.0
9830.5
9880.0
9880.5
9969.5
9970.0
9980.0
9981.0
9999.0
10008.0
10009.0
10022.0
10023.0
10044.0
10076.0
10077.5
10078.5
10079.5
10081.0
10082.0
10087.5
10088.0
$
REMARKS:
9650.5
9685.5
9710.0
9719.5
9720.0
9829.5
9879.5
9880.0
9969.5
9970.0
9979.0
9980.0
9999.0
10008.0
10008.5
10021.5
10022.0
10043.0
10074.0
10075.5
10076.0
10077.5
10079.0
10079.5
10086.0
10086.5
PDK-100/GR Log.
LOG TIED INTO SONIC RUN 01-FEB-76.
NOTE TUBING TAIL AND STRADDLE PACKER HARDWARE IS
IN THE WELL.
WHP = 780 PSI WHILE LOGGING
PASS 2 IS SPLICED AT 9824.
LOGGING PROGRAM ORGANIZATION:
1. PUMPED 321 BBL SEAWATER & 17 BBL METHANOL
2. LOGGED 3 PASSES
A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR ALL
THREE PASSES. THE CURVE IS NAMED SGNT AND WAS
CORRECTED WITH THE FOLLOWING PARAMETERS:
BOREHOLE SIZE = 8"
CASING SIZE = 5.5"
SALINITY = 25,000 PPM
A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR ALL
THREE PASSES.
SHIFT PROCEDURE AS FOLLOWS:
1. FIRST PASS GAMMA RAY DEPTH MATCHED TO PREVIOUS
OPEN HOLE GAMMA RAY.
2. FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST
PASS GAMMA RAY.
3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS SGMA.
/ ??MATCH1A. OUT
$
~ILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 9328.0 10090.0
PDK 9340.0 10102.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH SGMA
9368.5 9364.5
9421.0 9417.5
9432.5 9430.5
9435.0 9433.0
9435.5 9434.0
9479.5 9475.5
9515.5 9512.0
9528.5 9528.0
9529.5 9529.0
9542.0 9543.5
9547.0 9548.5
9547.5 9550.0
9548.0 9550.5
9570.0 9570.0
9607.0 9609.0
9609.0 9611.0
9617.0 9616.5
9623.0 9622.5
9623.5 9623.5
9710.5 9710.5
9714.0 9713.5
9720.0 9719.5
9973.5 9973.5
10000.0 10000.0
10009.5 10008.5
10010.0 10009.0
10016.5 10016.0
10021.5 10021.0
10033.5 10033.5
10042.0 10041.5
10042.5 10042.0
10043.5 10042.5
10044.5 10043.5
10076.5 10075.0
10077.5 10075.5
10089.5 10087.5
10105.0 10103.0
$
EQUIVALENT UNSHIFTED DEPTH
REMARKS:
PASS 1.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
/ ? ?MATCH1B . OUT
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CSLS PDK 68 1 CU 4
6 LS PDK 68 1 CPS 4
7 MSD PDK 68 1 CU 4
8 RATO PDK 68 1 4
9 RBOR PDK 68 1 4
10 RICS PDK 68 1 4
11 RIN PDK 68 1 4
12 SGMA PDK 68 1 CU 4
13 SGMB PDK 68 1 CU 4
14 SS PDK 68 1 CPS 4
15 SGNT PDK 68 1 CU 4
16 PHI PDK 68 1 PU-S 4
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24
64
* DATA RECORD (TYPE# 0) 958 BYTES *
Total Data Records: 115
Tape File Start Depth = 9305.000000
Tape File End Depth = 10105.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 27218 datums
~ape Subfile: 2
Minimum record length:
Maximum record length:
313 records...
62 bytes
958 bytes
~ape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE S~Y
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 9308.0 10090.0
PDK 9320.0 10102.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH GRCH
9347.0
9379.5
9380.0 9378.0
9403.5 9400.0
9414.0 9410.5
9423.5 9420.5
9435.0 9433.0
9436.0 9433.5
9436.5 9434.0
9473.0 9469.5
9473.5 9470.0
9474.5 9470.5
9479.5 9475.5
9483.5 9479.5
9484.0 9480.5
9485.0 9481.5
9490.5 9487.0
9503.5 9500.5
9510.5 9510.0
9515.5 9512.5
9522.0 9522.0
9527.0 9527.0
9530.5 9530.0
9535.5 9535.0
9540.0 9541.5
9548.0 9549.5
9549.0 9550.0
9549.5 9551.5
9558.5 9560.5
9559.5 9561.0
9560.5 9560.0
9561.0 9562.5
9562.0 9563.0
9562.5 9563.5
9563.5 9564.0
9567.5 9568.0
9568.5 9568.5
EQUIVALENT UNSHIFTED DEPTH
SGMA
9343.0
9376.0
9570.5
9571.0
9573.5
9577.0
9581.0
9581.5
9590.5
9591.0
9595.0
9595.5
9600.5
9609.5
9610.0
9618.5
9619.5
9620.5
9622.5
9623.0
9645.5
9646.0
9647.5
9648.5
9657.0
9658.0
9658.5
9659.0
9661.5
9672.5
9673.0
9674.5
9676.5
9682.5
9710.0
9711.0
9718.5
9721.0
9727.0
9736.5
9739.5
9777.5
9782.5
9819.0
9828.0
9829.0
9831.0
9839.0
9841.5
9842.0
9875.0
9905.5
9909.5
9912.0
9922.0
9943.0
9948.5
9953.5
9954.5
9956.5
9959.5
9969.5
9573.5
9577.0
9602.5
9611.5
9681.0
9718.0
9826.5
9829.5
9874.0
9570.5
9571.5
9581.5
9582.5
9591.5
9592.5
9596.5
9597.5
9612.0
9618.5
9619.5
9620.0
9622.0
9623.0
9645.5
9646.5
9648.0
9648.5
9657.0
9658.5
9659.0
9659.5
9661.5
9672.5
9673.5
9675.0
9676.5
9710.0
9710.5
9720.5
9727.0
9736.5
9739.0
9777.0
9782.5
9819.0
9828.5
9838.5
9840.5
9841.5
9905.0
9909.5
9912.0
9921.5
9942.5
9948.5
9953.5
9954.0
9956.0
9959.5
9969.0
9975.5
9987.0
9992.0
9995.5
9998.5
9999.0
10000.0
10008.0
10008.5
10009.5
10010.5
10012.0
10013.0
10013.5
10016.5
10033.0
10034.0
10043.0
10044.0
10044.5
10046.0
10046.5
10047.0
10048.0
10049.0
10057.5
10076.0
10077.5
10080.0
10080.5
10081.0
10082.0
10082.5
10090.0
10091.0
10091.5
10094.0
10094.5
10105.0
$
REMARKS:
9974.5
9986.5
9992.0
9995.5
9998.0
9998.5 9998.5
9999.0
10007.5
10008.5
10009.5
10010.0
10011.5
10012.0
10012.5
10016.0
10032.0
10032.5
10042.5
10043.0
10043.0
10045.0
10045.5
10046.0
10047.0
10047.5
10056.0
10073.5
10075.0
10077.5
10078.5
10079.5
10079.5
10080.5
10088.5 10088.0
10088.5
10089.0
10092.0
10095.0 10092.5
10103.0
PASS 2.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH2A. OUT
/ ? ?MATCH2B. OUT
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
1 GRCH PDK 68 1 GAPI
2 BIF PDK 68 1
3 BKL PDK 68 1 CPS
4 BKS PDK 68 1 CPS
5 CSLS PDK 68 1 CU
6 LS PDK 68 1 CPS
7 MSD PDK 68 1 CU
8 RATO PDK 68 1
9 RBOR PDK 68 1
10 RICS PDK 68 1
11 RIN PDK 68 1
12 SGMA PDK 68 1 CU
13 SGMB PDK 68 1 CU
14 SS PDK 68 1 CPS
15 SGNT PDK 68 1 CU
16 PHI PDK 68 1 PU-S
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 O0 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
64
* DATA RECORD (TYPE# 0)
Total Data Records: 115
958 BYTES *
Tape File Start Depth = 9305.000000
Tape File End Depth = 10105.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 27218 datums
Tape Subfile: 3 285 records...
Minimum record length: 62 bytes
Maximum record length: 958 bytes
T~pe ~ubfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9333.0 10090.0
9345.0 10102.0
BASELINE DEPTH GRCH
9314.5 9314.0
9319.0 9318.5
9319.5
9376.0
9381.0 9378.5
9381.5 9379.0
9383.5
9384.5
9411.5
9412.5
9414.0 9412.5
9415.0 9413.5
9416.0 9414.0
9417.0
9426.0
9429.5
9430.0
9430.5
9434.5
9435.0
9435.5
9436.0 9434.0
9437.0
9443.5
9444.5
9445.0
9446.0
9447.0
9447.5
9473.5 9469.5
9492.0
9492.5
9493.5
9494.5
9497.0
9497.5
9510.5 9510.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
SGMA
9313.5
9318.5
9372.5
9378.5
9380.5
9381.0
9408.0
9408.5
9412.0
9413.5
9422.5
9427.0
9427.5
9428.5
9432.5
9433.5
9434.0
9434.5
9440.5
9441.0
9441.5
9442.0
9442.5
9443.0
9469.5
9488.0
9489.0
9490.0
9490.5
9493.0
9494.0
9518.0 9514.5
9518.5 9515.5
9519.5 9516.5
9520.0 9517.5
9520.5 9518.5
9521.0 9519.5
9522.0 9522.0 9520.5
9527.0 9527.0
9528.0 9527.5
9530.0 9529.5
9540.0 9541.5
9546.5 9548.0
9547.5 9548.5
9549.0 9550.0
9549.5 9551.0
9550.0 9551.5
9551.0 9553.0
9558.5 9560.5
9559.5 9561.0
9560.5 9560.0
9561.0 9562.5
9562.0 9563.0
9563.0 9564.0
9564.0 9564.5
9564.5 9565.0
9565.5 9564.5
9566.5 9565.0
9567.5 9567.5
9570.5 9570.5
9573.5 9573.5
9574.5 9575.0
9577.0 9577.0
9581.0 9581.5
9581.5 9582.5
9587.0 9588.0
9593.0 9594.5
9595.5 9597.0
9596.0 9598.0
9601.5 9603.5
9609.0 9611.0
9610.0 9612.0
9617.5 9617.5
9621.5 9622.5
9642.0 9642.0
9642.5 9643.0
9648.0 9648.5
9649.0 9649.0
9649.5 9649.5
9650.0 9650.5
9651.5 9652.0
9652.5 9652.5
9659.5 9659.5
9660.0 9660.5
9663.0 9663.5
9663.5 9664.0
9664.0 9664.5
9671.0 9671.5 9671.5
9672.0 9672.0
9672.5 9673.0
9673.5 9674.0
9678.5
9680.5
9683.0
9683.5
9688.0
9688.5
9689.0
9710.0
9710.5
9711.0
9713.5
9740.0
9740.5
9824.0
9828.5
9829.0
9830.0
9839.0
9862.0
9863.5
9864.5
9865.5
9883.5
9899.5
9900.5
9901.5
9902.0
9908.0
9922.0
9923.0
9925.0
9925.5
9931.0
9948.5
9949.0
9950.0
9957.0
9959.0
9960.5
9969.0
9969.5
9970.5
10010.0
10012.0
10022.0
10022.5
10023.0
10029.0
10041.0
10041.5
10042.0
10042.5
10043.5
10044.0
10044.5
10046.5
10052.0
10052.5
10053.0
10053.5
9679.5
9682.0
9710.0
9713.0
9823.0
9827.5
9828.5
9829.5
9839.5
10010.5
10012.0
10023.0
10028.5
10041.0
10042.0
10044.0
10053.0
9679.0
9683.5
9688.0
9689.0
9689.5
9710.0
9710.5
9739.5
9740.5
9862.0
9864.0
9865.0
9865.5
9883.5
9900.0
9901.0
9901.5
9902.0
9908.5
9922.5
9923.0
9925.0
9926.0
9931.5
9949.5
9950.0
9950.5
9957.5
9960.0
9961.5
9969.5
9970.0
9970.5
10022.0
10023.0
10041.5
10042.0
10042.5
10043.0
10043.5
10044.5
10046.0
10051.5
10052.5
10053.0
lOQ54.o
10058.5
10076.0
10087.5
10088.5
10089.0
10089.5
10090.0
10091.0
10094.0
10094.5
$
REMARKS:
10087.0
10087.5
10088.0
10089.0
10089.5
10094.0
10053.5
10058.0
10074.5
10089.5
10093.0
10093.5
PASS 3.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH3 A. OUT
/ ? ?MATCH3 B. OUT
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CSLS PDK 68 1 CU 4
6 LS PDK 68 1 CPS 4
7 MSD PDK 68 1 CU 4
8 RATO PDK 68 1 4
9 RBOR PDK 68 1 4
10 RICS PDK 68 1 4
11 RIN PDK 68 1 4
12 SGMA PDK 68 1 CU 4
13 SGMB PDK 68 1 CU 4
14 SS PDK 68 1 CPS 4
15 SGNT PDK 68 1 CU 4
16 PHI PDK 68 1 PU-S 4
GAPI 4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
64
* DATA RECORD (TYPE# 0) 958 BYTES *
,Total Data Records: 115
Tape File Start Depth = 9305.000000
Tape File End Depth = 10105.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
54436 datums
Tape Subfile: 4
317 records...
Minimum record length:
Maximum record length:
62 bytes
958 bytes
T~pe Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited PaSs 1 gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: 0.5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
PDK
GRCH
$
REMARKS:
1, 2, 3
1
AVERAGED PASS.
PASSES 1, 2, & 3 WERE AVERAGED.
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length TyP Typ Cls Mod
1 GRCH PNAV 68 1 GAPI 4
2 BKL PNAV 68 1 CPS 4
3 BKS PNAV 68 1 CPS 4
4 BIF PNAV 68 1 4
5 CSLS PNAV 68 1 CU 4
6 LS PNAV 68 1 CPS 4
7 MSD PNAV 68 1 CU 4
8 RATO PNAV 68 1 4
9 RBOR PNAV 68 1 4
10 RICS PNAV 68 1 4
11 RIN PNAV 68 1 4
12 SGMA PNAV 68 1 CU 4
13 SGMB PNAV 68 1 CU 4
14 SS PNAV 68 1 CPS 4
15 SGNT PNAV 68 1 CU 4
16 PHI PNAV 68 1 PU-S 4
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
4 71 784 90 5
64
* DATA RECORD (TYPE# 0) 958 BYTES *
,Total Data Records: 115
Tape File Start Depth = 9305.000000
Tape File End Depth = 10105.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS regresentation code decoding summary:
Rep Code: 68 54436 datums
Tape Subfile: 5 137 records...
Minimum record length: 62 bytes
Maximum record length: 958 bytes
T~pe Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9327.0
PDK 9339.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10099.0
10111.0
12-APR-95
FSYS REV. J001 VER. 1.1
1408 12-APR-95
10141.0
10110.0
9350.0
10102.0
1200.0
YES
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL
SBAR SINKER BAR
PDK PDK-100
$
TOOL NUMBER
2725XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
10441.0
0.0
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
SEAWATER/METH
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT): 0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 700
FAR COUNT RATE HIGH SCALE (CPS): 3200
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 1.
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
24 Curves:
Name Tool Code Samples Units
1 GR PDK 68 1 GAPI
2 BIF PDK 68 1
3 BKL PDK 68 1 CPS
4 BKS PDK 68 1 CPS
5 CCL PDK 68 1
6 CSLS PDK 68 1 CU
7 CSS PDK 68 1 CPS
8 G1 PDK 68 1 CPS
9 G2 PDK 68 1 CPS
10 ISS PDK 68 1 CPS
11 LS PDK 68 1 CPS
12 MON PDK 68 1 CPS
13 MSD PDK 68 1 CU
14 RATO PDK 68 1
15 RBOR PDK 68 1
16 RICS PDK 68 1
17 RIN PDK 68 1
18 SGMA PDK 68 1 CU
19 SGMB PDK 68 1 CU
20 SPD PDK 68 1 F/MN
21 SS PDK 68 1 CPS
22 TEN PDK 68 1 LB
23 SGNT PDK 68 1 CU
24 PHI PDK 68 1 PU-S
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 06 511 09 0
4 4 00 201 24 1
4 4 39 705 61 6
4 4 74 169 61 6
4 4 92 630 79 6
4 4 00 201 24 1
4 4 00 201 24 1
4 4 35 975 96 1
4 4 36 631 32 1
4 4 71 162 89 6
4 4 71 162 89 6
4 4 32 125 68 0
4 4 00 201 24 1
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 96 761 61 6
4 4 00 201 24 1
4 4 52 386 28 5
4 4 05 626 89 6
4 4 17 922 28 5
4 4 00 201 24 1
4 4 00 201 24 1
96
* DATA RECORD (TYPE# 0) 1006 BYTES *
,Total Data Records: 314
Tape File Start Depth = 9327.000000
Tape File End Depth = 10111.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 132862 datums
Tape Subfile: 6 389 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
T~pe ~ubfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9307.0
PDK 9319.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL
SBAR SINKER BAR
PDK PDK-100
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
10100.0
10112.0
12-APR-95
FSYS REV. J001 VER. 1.1
1516 12-APR-95
10141.0
10110.0
9350.0
10102.0
1200.0
YES
TOOL NUMBER
2725XA
0.000
10441.0
0.0
SEAWATER/METH
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT):
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) : 700
FAR COUNT RATE HIGH SCALE (CPS) : 3200
NEAR COUNT RATE LOW SCALE (CPS) : 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 2.
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
24 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 G1 PDK 68 1 CPS 4
9 G2 PDK 68 1 CPS 4
10 ISS PDK 68 1 CPS 4
11 LS PDK 68 1 CPS 4
12 MON PDK 68 1 CPS 4
13 MSD PDK 68 1 CU 4
14 RATO PDK 68 1 4
15 RBOR PDK 68 1 4
16 RICS PDK 68 1 4
17 RIN PDK 68 1 4
18 SGMA PDK 68 1 CU 4
19 SGMB PDK 68 1 CU 4
20 SPD PDK 68 1 F/MN 4
21 SS PDK 68 1 CPS 4
22 TEN PDK 68 1 LB 4
23 SGNT PDK 68 1 CU 4
24 PHI PDK 68 1 PU-S 4
4 06 511 09
4 00 201 24
4 39 705 61
4 74 169 61
4 92 630 79
4 00 201 24
4 00 201 24
4 35 975 96
4 36 631 32
4 71 162 89
4 71 162 89
4 32 125 68
4 00 201 24
4 23 260 40
4 23 260 40
4 23 260 40
4 23 260 40
4 96 761 61
4 00 201 24
4 52 386 28
4 05 626 89
4 17 922 28
4 00 201 24
4 00 201 24
0
1
6
6
6
1
1
1
1
6
6
0
1
0
0
0
0
6
1
5
6
5
1
1
96
* DATA RECORD (TYPE# 0) 1006 BYTES *
,Total Data Records: 323
Tape File Start Depth = 9307.000000
Tape File End Depth = 10112.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 134962 datums
Tape Subfile: 7 398 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
T~pe ~ubfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9332.0
PDK 9344.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL
SBAR SINKER BAR
PDK PDK-100
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
10099.5
10111.5
12-APR-95
FSYS REV. J001 VER. 1.1
1551 12-APR-95
10141.0
10110.0
9350.0
10102.0
1200.0
YES
TOOL NUMBER
2725XA
0.000
10441.0
0.0
SEAWATER/METH
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT):
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) : 700
FAR COUNT RATE HIGH SCALE (CPS) : 3200
NEAR COUNT RATE LOW SCALE (CPS) : 0
NEAR COUNT RATE HIGH SCALE (CPS) : 60000
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 3.
$
CN : BP EXPLORATION
WN : E - 04
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
24 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 G1 PDK 68 1 CPS 4
9 G2 PDK 68 1 CPS 4
10 ISS PDK 68 1 CPS 4
11 LS PDK 68 1 CPS 4
12 MON PDK 68 1 CPS 4
13 MSD PDK 68 1 CU 4
14 RATO PDK 68 1 4
15 RBOR PDK 68 1 4
16 RICS PDK 68 1 4
17 RIN PDK 68 1 4
18 SGMA PDK 68 1 CU 4
19 SGMB PDK 68 1 CU 4
20 SPD PDK 68 1 F/MN 4
21 SS PDK 68 1 CPS 4
22 TEN PDK 68 1 LB 4
23 SGNT PDK 68 1 CU 4
24 PHI PDK 68 1 PU-S 4
4 06 511 09 0
4 00 201 24 1
4 39 705 61 6
4 74 169 61 6
4 92 630 79 6
4 00 201 24 1
4 00 201 24 1
4 35 975 96 1
4 36 631 32 1
4 71 162 89 6
4 71 162 89 6
4 32 125 68 0
4 00 201 24 1
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 96 761 61 6
4 00 201 24 1
4 52 386 28 5
4 05 626 89 6
4 17 922 28 5
4 00 201 24 1
4 00 201 24 1
96
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 312
Tape File Start Depth = 9332.000000
Tape File End Depth = 10111.500000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
210838 datums
Tape Subfile: 8
387 records...
Minimum record length:
Maximum record length:
62 bytes
1006 bytes
Tape Subfile 9 is type: LIS
95/ 4/20
01
**** REEL TRAILER ****
951 4~20
01
Tape Subfile: 9 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Thu 20 APR 95 4:00p
Elapsed execution time = 22.79 seconds.
SYSTEM RETURN CODE = 0
CONFIDENTIAL
STATE OF ALASKA COP~
DIRECT
DIGITAL
LOGGING
COMPUTER
PROCESSED
ANALYSIS
RECEIVED
JUL 0 2 ~.984
Alaska 0il & Gas Cons. Corn
Comp~n~2 SOHIO ALASKA PETROLEUM CO.
Wmlt E-4 CH?CHS
Fimtd PRUDHOE BAY
Count? NORTH SLOPE
Stmtm
wLmoKA
Countrp USA
CLIENT
FORMAT
DATA
TAPE
LOG
INFORMATION
STANDARD
FORMAT ( L, I ,
Nature: E-.4 CH,."C:HS
F i m I d: PRUDHOE BAY
['-,..ate: 26 JUNE_
Ti~e: 4:21 PM TUE,
Page:
L, I, S,
TAP.E RECORDS
Smrvic~ name_,' &GSFOi
Pr~viou:--, re:el:
HEADER
Date: 84?06/26 Origin
Comments~
RECORDS
'-'ont,_. inuati::,n ~: 01
Set. vice r, amm: &GSFOt
Rr'evious tap¢~
Oatm: 84/06726 Origin:
Comments:
Tapm namm:
28 i 8S2
Continuation ~: Oi
** EOF
FiLE HEADER
Fii~ na~:~: &GSF01. 00t
HEADER RECORDS
S~rvic~ namm;
Maximum t~_ngt, h: 1024 Fit~_ typ~.: LO
V~rsion ~:
Prmviou$ ~ilm:
Oat~:
P~g~
MNEN
CN
WN
FN
C 0 U N
CTRY
SECT'
TOWN
RANG
EK8
EDF
EGL
PD
LMF
RUN
LCC
SON
FL
LUL
ENGt
WiTN
TLi
8Li
TCS
TLR8
8HT
MRT
MT
MSS
MViS
RM
RMF
NFST
RMC
MCST
MCSS
INFORMATION
CONTENTS
:$JHIO Ht...H~.~,H PETROLELIM CO
E-4 CH,,'CNS
PRUDHOE BAY
NORTH SLOPE
AL'"'-M.:,KH .... ,
].:A , , ,
!4E
56,520 , , ,
55 .S°O
O, 000,
SL
KB
.-,o i 83';
NORTH SLOPE
NORTH SLOPE
.CH i TE
WOI_FE
'I Oi41 ,8OO
9oo-~ 800
9o~o O00
O,OOO
O, OOO
i95,088
~95,088
CRUDE
0,000 .....
0.000 .....
0,000 .....
O, OOO .....
RECORDS
UNiT
t
TYPE
CAT6 SiZE CODE
P.age
COMMENT
RECORD¢'
:~ This LIS tapm was writtmn b~.,~ Gmarhart industrims Wir~tinm Smrvicms,
** All cur. vm and tool mnmmonics usmd mrm thosm which most ciosmly match
** Gmmrhart curvm and tool mnmmonics.
GEARHART TO SCHLUMBERGER
MNEM SERVICE UNIT MNEM SERVICE UNIT
DEPTH FEET DEPT FT
GR MCP GAPI GR GAPI
CCL MCP MV CCL MV
CNS MCP ~'
~. LIME NPHi PU
FCNS MCP CPS FCNL CPS
NCNS MCP CPS NCNL CPS
RAT COMPUTED RAT
AVG COMPUTED AVG
P~g~
DATA
ENTRY E:LOCKS :~ · '~-' ~:
EHTRY
FORMAT
'TYPE SIZE
,_.PEu I F I cA T I O_Nc'
CODE
0 1 G6
Pagm
ENTRY 8L. OCK LEGEND
TYPE DESCRIPTION
0 Terminator ( no more entries )
DATA
FORMAT
,-..F t~L: i F i CAT iOH 8LOCKS
;;.1~;~;~< DATUM '-' '-"
SERVI.,E SERVICE APl AP1 APl APl
i'INEM ID ORDER ~ UNiT LOG TYPE CLASS MOD
DEPT 281832 FT 0 0 0 0
u~-.: z,u 1 ~._~2 ~AP i 0 :~ i 0 O
CCL 28~8~2 MY 0 0 0 0
NPH i 28 i '=
:s.m~ PU 0 68 2 0
FCNL 281832 .-.o,-,
u~ 0 0 0 0
NCNL 28i832 CPS 0 0 0 O
RAT 281,~:; -" "~..,. 0 0 0 0
AYG 28 i 832 0 0 0 0
SPEC I F I CAT I ON
.
FiLE
PR_. C-
SiZE LVL SHPL
RC
4 0 1 68
4 0 i 68
4 O t 68
4 0 i 68
4 0 I 68
4 0 i 68
4 0 i 68
4. 0 i 68
PROCESS iNDiCATORS
000000 O0000O 000000
000000 000000 000000
000000 000000 O000OO
000000 000000 000000
000000 O0000O 000000
000000 000000 000000
O00OO0 000000 000000
000000 000000 000000
Pag ~!
DEPT
GR
CCL
DA
NPHI
TA
RECORD®
FCNL
NCNL
RAT
99i8, 000
0,000
0 000
27,950
521.500
688 ?00
i 32i -742,263
98t8,000
3t ,600
!70
14,880
636,008
646 900.
i 0t7
9718,000
23,500
05O
lt,?O0
782.400
728 000
10,852
9618. 000
40,000
030
14,01 0
5,97,000
594 700
t 01.3
14.757
9518,000
I 03,200
260
9,690
738,800
678 900
9.775
94!8.000
92,600
200
14,630
624,300
644 500
I 032 -238,390
93i8,000
8i,800
iiO
25,i50
280.700
.357 i00
i 272
26,893
Maximum ]Length: t024'
TRA I LER RECORD'-'o
Film type: LO
Version
Next ¢ilm:
P.ag 6,
:~ EOF ***
Ma:.,:'. i mum i~ngth: ~ 024
HEADER RECORDS
V~rsion ~:
F i im type: LO
Previous ¢ilm:
P~g~
10
ON
W N
r~,~:
l- t",!
COUN
STAT
SECT
TOWN
EKB
EDF
EGL.
PD
LMF
u r! r
RUN
LCC
S O N
LUL
ENG i
W i TN
uL
~Ll
TL~B
8HT
HRT
M T
HS, S
HViS
RH
RMF
biFST
FiF ~.
oS
RHC
HCST
HC':'~
L':ONTENTS
SOHIO
E-4 CH/CNS
PRUDHOE BAY
NORTH SLOPE
ALASKA
UE;A.
i iN,,,
i4E, , ,
55,52 0
O, 000
SL
KB,,.
, eOB
t--IU P..'; n
NORTH
WA i TE
WOLFE
10141
98
9300,
987°
O. 000
O, 000
i95,0
195,0
CRUDE
ALMoKM PETROLEJM
SLOPE
. 000 .
O00. ,
000..
O00..
u, 000,,.
O, 000.,,
0,000.,,
O, 000, ,,
0.000...
INFORMATION
RECORD"'o
UNiT TYPE CATG SiZE CODE
0 O 40 ~-.o:'
0 0 40 6.5
0 0 40
0 0 20 65
0 0 20 65
0 0 2 0 E, 5
O. 0 ~.<' 65
0 0 3 65
0 0 75 65
FT 0 3 4 68
FT O 2, 4 68
FT O ~ 4 FiR~,-
0 3 2 65
0 3 2 65
O 3 2 65
0 0 2 79
0 O 2 79
0 0 i 0 65
0 0 10 65
0 0 20 65
0 0 20 65
O 0 20 65
0 0 20 65
FT 0 3 4 68
FT O 3 4
FT O .3 4 68
FT 0 3 4 .-o
HR 0 2 4 68
HR O 4 4
~,,~
DEGF 0 i 4 68
DEGF 0 i 4 68
O :-:' Z U
0 2 20 65
CP 0 2 4 68
Ft ...... ~ o
,. ~. r,': 0 2 4 _...,
0 H t,i t'i 0 2 4 ,S
DF
_GF 0 ~. 4 68
0 2 i2 65
0 H Mt'i 0 c, 4 ~ o
DEGF 0 .--'-' 4 68
0 2 i2 65
CONFIDENTIAL
STATE OF ALASKA COPt
Pag~
11
COMMENT '.RECORDS
-'~m This LIS tmpm was writtmn b~.. G~_arhmrt industrims Wirmiinm Smr',~icms, :si:+:
mm All curve and tool mnemonics used mr~ those which mo~t closmip match ~.:~.
*:~. Gearhart curvm and .tool mnmmonics. ..
GEARHART TO SCHLU~lSERGER
i4NEM SERVICE UNIT MNEM
DEPTH FEET DEPT
GRi MCP GAPi GR
CCLi MCP MY CCL
'CNSi MCP X LIME NPH!
FCNSi MCR CPS FCNL
NCNS1 MCP CPS NCNL
RATi COMPUTED RAT
SERVICE UNiT
FT
GAPi
PU
CPS
CPS
Pag~
~2
DATA
' ~:'~. ~.~ ENTRY BLOCKS ~$~.~
EN TR:r'
FI~RMA
T SPECIFICA
TYPE ..... t'
olZE UUCE
i 66
TION~
~=~m ENTRY 8LOCK LEGEND
TYPE DESCRIPTION
0 Tmrminator ( no morm'mntrims )
DATA FORMRT
SERVICE SERVICE
i"~HEH i D ORDER ~
AP1 AP1 AP1 AP1 FILE
UNiT LOG TYPE CLASS HOD ~
D E P T
~]R
CCi_
HPH i
F"'HL..,
NCNL
RAT
281832 FT
28i832 GAPi
281832 HV
281872 PU
281832 CPS
281872 CPS
281872
0 0 0 0 0
0 3 i 0 0 i
0 0 0 0
0 68 2 0 1
0 0 0 0
0 0 0 0
0 0 0 0
oPEC 1 F ,I CATI UNS
PRC ~
SiZE LVL SHPL
4 0 1
4 0 i
4 0 i
4 0 i
4 0 t
4 0 i
4 0 1
RC
68
68
68
68
68
6,8
68
PKu~.~.., INDiC:ATORS
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000.000000 000000
000000 000000 000000
DEPT
GR
C;C L
DATA
NPHi
RECORDS
FCNL
NCNL
RAT
'i 5
9900,500
0.000
0 00o
30 100
302,400
,380,400
i ,258
9800.500
24.800
640
770
752,500
727.000
,966
9700.500
22.~00
390
7 550
938.900
8i5.500
.869
9600,500
29,600
040
19 .360
486,000
546.500
!'24
9500.500
65,500
050
24 420
409. 1 O0
506,800
1 .239
9400.500
66.200
070
35 860
237,500
322.200
I .357
9300 ~00
72,200
050
27 090
272,500
350.800
287
Film name:: &GSFOi,002
TRA I LER RECORD"'o
Maximum tmngth: i0~24 Film t~pm: LO
V~rsion ~:
N~xt ¢ilm:
Oat~:
P~g~
EOF :e.~: *
~'::+:$ F t LE HEADER
F~ .l.e:. nama:. &GSFOi . 00'"
Fimximum le:ngth: i0~4
HEADER RECORDs,
Film typm: LO
Prmviou$ ?ilm:
MNEM
CN
t,Ji',i
FN
COUN
S T A T
CTRY
TOWN
RANG
EKB
EDF
EGL
PD
LNF
DMF
RUN
LCC
SON
LUN
FL
LUL
W i T N
DL
TL.i
TLAB
HRT
MY
HVi$
HFST
MFSS
RMC
MCS~
INFORMATION
CONTENTS
SOHIO ALASKA PEv':',
E - 4 C H ,/C iq S
PRUDHOE BAY
NORTH SLOPE ,
USA
06
i tN
0,000.
SL ....
K~ ....
30 ....
28i832
7208
NORTH
NORTH
WA i TE
WOLFE
iOi4l
9882,
933300,
9878,
O, OOO
O,OOO
195.0
i95,0
CRUDE
SLOPE
SLOPE
.000 ,,
000, , ,
000. , ,
000..,
OO. , .,
0 000
0,000
0,000
0,000
u,O00
0,000
RECORDS
UN I T TYPE
SIZE
CODE
0 0 40 65
0 0 40 65
0 0 40 65
0 0 ']0 "'~
0 0 20 65
0 0 20 65
O 0 2 65
0 0 .S 65
0 0 ._~ ~,..
FT 0 3 4 68
FT O 3 4 68
FT 0 3 4 68
O 33 2 65
0 .3 2 65
0 3 2 65
0 0 2 2:9
0 0 2 79
0 0 i 0 65
0 0 i0 6:
0 0 20 65
0 0 20 65
0 0 2 0 65
0 0 20 65
FT 0 .3 4 68
FT 0 ~ 4 68
FT 0 .7, 4 68
FT 0 ,.,'~ 4 68
HR 0 2 4 68
HR 0 4 4 68
DEGF 0 1 4 68
DEGF 0 i 4 68
0 2 20 65
0 ,- 9 ..-":' 0 6 5
CP 0 2 4. 68
OHMM O 2 4 68
OHMM O 2 4 68
DEGF 0 ~."~ 4 68
0 2 i '2 65
OHMM O 2 4 68
DEGF 0 2 4 68
0 9 1 '-' 6 5
Pag~
COMMENT
RECOED°
This LIS tmpm was wcitt~_n bp Gm,~r. hmrt Industrims Wir~.linm Smr. vicms, m*
All curvm mhd tool mnmmonics usmd mrm thosm which most closmly mat~h **
G~ar. hart cur-vm and tool mnemonics. **
GEARHART TO SCHLUMBERGER
MNEM SER;~ i CE UN i T MNEM
DEPTH FEET DEPT
NCNS2 Mr:F' C:PS Nr:NL
FCNS2 MCP CPS FCNL
~R'-~ MCP GAP i GR
L. ~L~ MCP MV CCL
p,~c.-~, MCP '"
.-. LIME NPHi
RAT2 COMPUTED RAT
SERVICE UNiT
FT
CPS
CPS
GAPI
MY
PU
Pagm
19
DATA FORMAT SPEC I F I CAT IONS
ENTRY
TYPE SIZE CODE
0 i 66
Pa g~z
2O
;:~:,":* ENTRY BLOCK LEGEND
TYP[ C £.~URIPTION
0 Ter'minmtor < no more entriez )
FORMAT
'='ERV!...E SERVi~.E AP1 AP1 AP1 AP1 FILE
i"i~-~EM iD oRDER ~ UNiT LOC~ TYPE CLARR MOD
DEPT 28 i - 3'-,
,~ ._ ,_ FT 0 0 0 0 0
NCNL 28i832 CPS 0 O 0 0 2
FCNL 29i,~'='~"",..,~ CPS; 0 O 0 O 2
GR ::'8 i ~..~ GAP i 0 ,.7 i 0 0 2
CCL 2818'3;-2 MV O O O 0 2
NPH i 28 i 8.7,2 PU O 68 '--'
~ 0 2
RAT 28 i :R.72 O 0 0 O 2
'-'PEC._,- I F i CA T I ONe.-,
PRC ~
SiZE LVL Sf, iPL RC
4 0 1 68
4 O i 68
4 O I 68
4 0 i 68
4 0 i 68
4 0 i 68
4 0 i 68
PRCU~_oo iNDICA IU~o
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 O0000O 000000
000000 000000 000000
000000 000000 000000
P~g~
DEPT
NCNL
FCNL
DATA
GR
RECORDS
CCL
NPH I
RAT
P~g~
9900,000
601 ,700
576 800
0.000
0,000
i5,830
I 047
~00.000
r ¢.....~ , 400
742 300
2t ,600
,230
i2.1iO
983
9700,000
804., 900
94i 000
'22. 500
.i20
7.450
9600,000
545,500
4._. ~, 600
~0 400
,0'!. 0
20
9500,000
51 0.o-00
43i 200
6i.900
.030
24.?60
t i85
9400,000
23.3 800
'FO
,!t0
42.41 0
9.300. 000
337,700
260 400
6'8,900
,030
32,870
i 297
FiLE TRAILER
Maximum imngth: 10~4
Film typm: LO
TRAILER RECORDS
Vmr. mion ~:
Nmxt ~ilm:
Oatm:
23
· ~: EOF :~.m~
EOF :~.m~
11
I1
1111
1111
11
11
11
I1
11
11
11
11
1111
1111
11
11
000000
O0000O
O0 O0
O0 O0
O0 0000
O0 0000
O0 O0 O0
O0 O0 O0
0OO0 OD
0000 O0
OD OD
O0 O0
00OOO0
000000
7777777777
7777777777
77
77
77
77
77
77
77
77
77
77
77
77
000000
oooooo
OD OD
O0 O0
00' '0000
O0 0000
00 OD OD
O0 OD O0
OOO0 O0
0000 O0
O0 OD
O0 O0
OOOOO0
000000
7777777777
7777777777
77
77
77
77
77
77
77
77
77
77
77
77
666666 11
666666 11
66 Illl
66 1111
66 11
66 11
6666666b 11
66666666 11
66 66 11
66 66 1.1
66 66 11
66 66 11
666666 1111
666666 11.1.1
11
11
22 22
22 22
22
22
22222222~
222222222
066666
666666
66 66
66 66
66 66
66 66
66666666
66666666
66 66 66
66 66 66
6 66 66
6 66 66
666666 666666
666666 666666
66
PPPP AAA M M
P P A A MM MM
P P A A M M M
PPPP A A M M
P AAAAA M M
P A A M M
P A A M M
PPPP BRRR
P P P R
P P P R
PPPP RRRR
P ~ R
P ~ R
P R R
U U DDI)D
U U D D
U U D I)
U U D D
U U D D
U U D D
UUUUU DDDD
H H ()OO EEEEE
H H O O E
H H O O E
HHHHH 0 0 EEEE
H H 0 O E
H H O 0 E
H H OOO EEEEE
*START* USER PCAL
MONITOR SWS KLIOE40
*START* USER PCA.L
MONITOR 8WS KL10E40
[1070'7,61266] JOB
NOV-80. *START*
[10707,61266] JOB
Ni)V-80. *START*
SHiP
SEQ. 4667
SHIP SEQ. 4667
DATE oq-JAN-81
DATE Oq-jAN-81
10:06:00
10:06:00
SSSSSSSS HH HH
SSSSSSSS HH HH
SS HH HH
SS HH HH
$S HH HH
SS H~ HH
SSSSSS HHHHHHHHHH
SSSSSS HHHHHHHHHH
SS HH }iH
SS HH HH
SS HH HH
SS HR HH
SSSSSSSS HH HH
SSSSSSSS HH HH
IIIIII
IIIIII
II
II
II
II
II
II
II
ii
II
II
Iiiiii
IIIIII
PPPPPPPP
PPPPPPPP
PP PP
PP PP
PP PP
PP PP
PPPPPPPP
PPPPPPPP
PP
PP
PP
PP
PP
PP
TTTTTTTTTT
TTTTTTTTTT 0.0OOOO
TT OO O0
TT ~0 O0
TT O0 OO
TT O0 O0
TT O0 O0
TT O0 O0
TT O0 O0
TT 00 O0
TT O0 OU
TT O0 O0
TT 000000
TT 0,00000
*START* USER PCAL [10707,61266] dOB SHIP SEQ. 4667 DATE 09-JAN-81
MONITOR SwS KLIOE40 NOV'80. *START*
EILE: DSRH:SHiP.TO<255>[10707,61266] CREATED: 09-JAN-81 09:19:18
PRINTED: 09-dAN-81 10:06:25
OUEUL SWITCHES: /FILE:FORT /COPIES:I
/SPACING:I /LIMIT:108 /FORMS:NORMAL
10:06:00
SHIP TO :
SHIPPING INSTRUCTIONS
iSSUED 9-JAN-81 09: ! 8
BY PAM
PCCC
PCCC
V~:NTURA, CALIFORNIA
V¥ V¥ EEEEEEEEEE RRRRRRRR
VV ¥¥ EEEEEEEEEE RRRRRRRR
VV YV EE RR RR
VV V¥ EE RR RR
VV YV EE RR RR
VV VV EE RR RR
VV VU EEEEEEEE RRRRRRRR
VV YV EEEEEEEE RRRRRRRR
VV V¥ EE RR RR
VV VV EE RR RR
VV VV EE RR RR
VV VV EE RR ~R
YV EEEEEEEEEE RR RR
VV EEEEEEEEEE RR RR
IIIIII
iIIIII
I1
II
I1
II
ii
II
II
I1
II
iIIIII
IIIIII
YY
YY
YY
YY
YY YY
YY YY
YY
YY
YY
YY
YY
YY
YY
YY
YY
YY
YY
000000 000000 666666
000000 000000 666666
O0 O0 O0 O0 66
O0 O0 O0 O0 66
O0 0000 O0 0000 66
O0 0000 O0 0000 66
O0 O0 O0 O0 O0 O0 66666666
O0 O0 O0 O0 O0 O0 66666666
0000 O0 0000 O0 66
0000 O0 0000 O0 66
O0 O0 O0 O0 66
O0 O0 O0 O0 66
000000 000000 666666
000000 000000 666666
66
66
66
66
*START* USER PCAL [10707,61266] ,JOB SHIP
MONITOR S~S KLIOE40 NOV'80. *START*
FILE: DSKH:VERIF¥.OO6<05Z>[10707,61260] CREATED:
PRINTED: 09-dAN 81 10:06:]9
OUEUE 8WITCHES: /FiLE:FORT /COPIES:!
/SPACING:I /LIMiT:lO8 /FORMS:NORMAL
4667 DATE O9-jAN-81
Og-JAN-81 09:50:24
10:06:00
VERSION 15,H01 79/0]/26
SCHLUMBERGER COMPUTING CENTER
1.0707,61266
REEL HEADER
I,ENGTH: !]2 BYTES
REEL NAME: P.C.A.L.
SERVICE NAME: EDIT
REEL CONTINUATION NUMBER: 01
PREVIOUS REEL NAME:
COMMENTS: LIS FORMAT CUSTOMER TAPE
DATE: 81/ I/ 9
TAPE HEADER
LENGTH: 112 BYTES
TAPE NAME: 61266 DATE: 81/ 1/ 9
SERVICE NAME: EDIT
TAPE CONTINUATION NUMBER: 01
PREVIOUS TAPE NAME:
COMMENTS: UNIOUE WEbb IDENTIPICATiON NUMBER IS 50'029'20184
TAPE COMMENTS
THE NEAR COU.NT RATES FROM PASSES 1 AND ) .ARE NOT
ANY GOOD , AND S(] WERE NOT PUT ON THIS TAPE.
FILE HEADER
LENGTH: 62 BYTES
FILE NAME: EDIT .001
MAXIMUM PHYSICAL RECORD LENGTH:
PRE¥IOUS ~ILE NAME:
FILE COMMENTS
WORDS 2-5 ARE PASS fINE
WORDS 6-10 ARE PASS TWO
W()RDS 11-15 ARE PASS THREE
COMPANY : SOBI(] ALASKA PETRO.
WELl., : E-4
FIELD : PRUDHOE BAY
RANGE : 14E
TOWNSHIP : liN
SECTION : 6
COUNTY : N. SLOPE
STATE : ALASKA
DENSIT~ : 800.
1024 BYTES
DATA F(']PMAT SPECIFICATION
LENGT~: 570 BYTES
ENTR~ BI,,,OC~S:
T~PE
0
SIZE I~EP CODE ENTRI
1 66 0
DATI~N SPECIPICATION B6t3CKS:
NAME TOOL UNIT API AP1 AP1, API FILE SIZE SAN REP PRUCESS iNDICATORS
! DEPT
2 GR CML
] NPHI CML
4 NRAT CML
5 FCNL CML
6 GR CNL
7 NPHi CML
8 NRAT CML
9 NCNL CML
10 FCNL CML
11 GR CML
12 NPHI CML
I]NRAT CML
14 FCNL CML
FT 0 0 0 0 0 4 I 68
GAPI 42 31 ]2 0 0 4 I 68
PU 42 68 ] 0 0 4 1 68
C/C 42 42 1 0 0 4 1 68
CPS 42 34 93 0 0 4 I 68
GAPI 42 31 32 0 0 4 I 68
PU 42 68 3 0 0 4 1 6~
C/C 42 42 1 0 0 4 ! 68
CPS 42 ~4 92 0 0 4 1 08
CPS 42 34 93 0 0 4 1. 68
GAPI 42 31 32 0 0 4 1 68
PU 42 68 3 0 0 4 I 68
C/C 42 42 t 0 0
C~S 42 ~4 93 0 0
USER DEFINED OUTP[JT ARRAY
OUTPUT GR AT 2
OUTPUT NPHI AT
OUTPUT NRAT AT 4
OUTPOT FCNL AI 5
OUTPt]T GR AT 6
OUTPUT NPH! AT 7
OUTPUT NRAT AT 8
OUTPUT NCNL AT 9
OUTPUT FCNL AT 10
OUTPUT GR
OUTPUT NPHI AT 12
O~TPUT NRAT AT
OUTPUT FCNL A~ 14
DEPTH
9945.000
9900o000
9800.000
9700.000
9600.0'00
9500.000
9400.000
9300.000
9280.000
MN
EMClN .I.C
GE
GR
FCNL
FCNL
GR
GR
FCNL
FCNL
GR
GR
FCNL
FCNL
G~
GR
FCNL
FCNL
GE
GR
FCNL
FCNL
GR
GR
FCNL
FCNI,
GR
GR
FCNL
FCNL
GR
GR
FCNL
FCNB
GR
GR
FCNL
FCNL
VALUE
0.000
-999.0oo
-999.000
-999.000
21.2OO
22.400
268.554
258.687
14.100
17.600
390.390
387.387
MNEMONIC
NPHI
NPHI
GR
VALUE MNEMONIC
0.000 NRAT
-999.000 NR.AI
-999.000 NPHI
NPHI 15.800 NRAT
NPHI 14.980 : :NRAI
GR 1,8.700 NPHi
NPHI
NPHI
GR
12,060 NRAT
11.560 NRAT
I6.000 NPHI
16.100 NPHI 7.580 NRAT
16.200 NPHI 7 740 NRA~
520.806 GR 17~600 NPH~,
517.803
23.600
7.100
21 213
77.300
71.30
169.02~
155.298
NN PHI
PHI
GR
NPHI
NPHI
GR
9 740 NRA
25.:600 NPHI
27.780 NRAT
27.160 NRAI
72.000 NPHI
VALUE
73.800
71.200
87.516
95.238
73.900
68.400
99.528
97.812
215.400
198.900
991.848
983.268
MNEMONIC VALUE
0.000 FCNL 0.000
-999.000 NCNb -999.000
-999.000 NRAT -999.000
2.412
2. 328
16.340
FCNL 260.403
NC:NB 606.606
NRAT 2.494
2 122
2]098
12.080
NRAT 2.098
1.724 FCNL
.720 NCNB
.820 NRAT
531.102
2.656 FCNb 226.512
.778 NCNb 595'881
19.740 RA~ 2.722
NPH! 45.460 NRAT 4.364 FCNB 88.374
NPHI 48.]20 NRAT 4.492 NCNb 399.828
GR 71.700 NPHi 43.280 NRAT 4.202
38.680 NRAT
]9.540 NRAT
75.200 NPHI
NPHI
NPHI
GR
NPHI 19.880 NRAI
NPHI 20.000 NRAT
GR O.000 NPH1
3.866 FCNL 102.960
3.944 NCNB 374.517
39.520 NRAT 3.888
2.298 FCNb 995.280
2.298 NCNL 997.425
-5.000 NRAT 2.282
SUM, MAP.~ OF DATA RECORDS
N[]MBSR OF RECORDS: 74
LENG~B £)F R~]CORDS: 1014 BYTES
LENGTH OF LAST RECURD: 958 BYTES
FILE TRAiLE
LENG~I~H: 62 BYTES
FILE NAME: EDIT .001
MAXIMUM PHYSICAL RECORD LENGTH:
NEXT FILE NAME:
024 BYTES
EOF
TAP~ TRAILEB
LENGTH: ].]2 BYTES
TAPE NAME: 51266 DATE: 81/ l/ 9
SERVICE NAME: EDIT
TAPE C£]NTINUATi~N NUMBER: O1
EXT TAPE NAME:
,OMMENTS: UNIQUE WELL IDENTIFICATION NUMBER IS 50-029-20184