Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout178-054STATE OF ALASKA 3 ~/-G+~ ALASK~L AND GAS CONSERVATION COM~SION ~IA~i 1 (~ 21j~9 WELL COMPLETION OR RECOMPLETION REPORT AND ~R;C~~ ~d~ ~ ~~$ ~~~~ ~mmissia~ flnnMn~..ri., 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended zoAAC zs.~os zoAAC zs.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband 2/16/2009 12. Permit to Drill Number 178-054- 308-456 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 09/20/1978 13. API Number 50-029-20321-00-00 - 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 10/15/1978 14. Well Name and Number: PBU B-10 2070 FNL, 1611 FEL, SEC. 31, T11N, R14E, UM Top of Productive Horizon: 288' FNL, 615' FWL, SEC. 05, T10N, R14E, UM 8. KB (ft above MSL): 64.3' - Ground (ft MSL): 37.24 15. Field /Pool(s): _ Prudhoe Bay Field / Prudhoe Bay Total Depth: 876', FNL, 871' FWL, SEC. 05, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 5760' 5359' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 664056 y- 5948581 Zone- ASP4 10. Total Depth (MD+TVD) 11100' - 9405' 16. Property Designation: ADL 028313 - TPI: x- 666371 y_ 5945133 Zone- ASP4 Total Depth: x- 666642 y- 5944550 Zone- ASP4 11. SSSV DeN hA(MD+TVD) 17. Land Use Permit: 18. Directional Survey ^ Yes ®No u mi I r ni n rin inf rm i n e 2 2 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIL, SP, BRCS, GR, FDC, CNL, CAL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD' SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM .TOP BOTTOM SIZE CEMENTING RECORD PULLED = " x 20" In ulat C nd r urf 11 S 11 79 c Ar i et ~~ -1/ ~~ / " 47# L- 0 1 11' rfa 17' 1 -1/ " 1 7 I P rm fr ' 7" 2 L- 0 1 -112" 1 CI 23. Open to production or inject ion? ^ Yes ®No 24. TUBING RECORD If Yes, IISt each I (MD+TVD of Top & Bottom; Pe nteNal Open rforation Size and Number): SIZE DEPTH SET MD PACKER $ET MD None 4-1/2", 12.6#, L-80 9354' - 10344' 9428' & 10336' MD TVD MD TVD 25. ACID, FRACTURE,: CEMENT. SQUEEZE, ETC. ~ ,y ~ % ~ ! tl ~ j f1('I~k DEPTH INTERVAL MD AMOUNT St KIND OF MATERIAL USED H ~J 9300' Set EZSV -9200' P&A w/ 40.5 BBIs 'G' (Placed 8 Bbls on top EZSV) 5759' . Set 2nd EZSV 5760' Set Whipstock Z6. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) A uired? ^ Yes ®No Sidewal l Core s A uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results pe-ZO AAG250.071. None ~~;s,- _~ ~~i)~ `'o? ~=~:. Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE . ~-~~w ~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN KERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10024' 8627' None Shublik 10063' 8655' Ivishak 10172' 8735' Formation at Total Depth (Name): 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. ~ Signed Terrie Hubble Title Drilling Technologist Date v /fib/b PBU B-10 178-054 308-456 Prepared By Name/Numt~er. Terrie Hubble, 564-4628 Well Number P m' . / A rov I N Drilling Engineer: Jovy Roach, 564-4352 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITenr 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-{n, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only • • BP EXPLORATION Page 1 0 -3' Operations Summary Report Legal Well Name: B-10 Common W ell Name: B-10 Spud Date: 9/20/1978 Event Nam e: REENTE R+COM PLET E Start : 2/8/2009 End: Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: 3/2/2009 Rig Name: NABOB S 2ES Rig Number: Date From.- To Hours Task ~, Code NPT Phase Description of Operations 2/7/2009 19:00 - 00:00 5.00 MOB P PRE Prepare and begin to move rig from 07-08B. Rig was released 19:00. 2/8/2009 00:00 - 01:30 1.50 MOB PRE Move the rig off of the well and onto the other side of the pad and prepare for move to B-Pad. Transported the shop, camp, and pits to B-Pad. 01:30 - 06:00 4.50 MOB PRE Transport the rig from DS 7 to B-Pad. 06:00 - 12:00 6.00 MOB PRE Spot rig over Well B-10/Cand lay out herculite. Level the sub and place mats in front of the sub. Also place a berm around cellar area. Welder replaced a hinge on the derrick house that was broken. 12:00 - 15:00 3.00 MOB PRE Spot the pit module and hook up the interconnect steam and water lines. 15:00 - 18:00 3.00 MOB PRE Raise the derrick and pin up the cattle chute. Spot the cuttings box, shop, and outside buildings. Complete the pre-spud checklist. -Ri acce ted ~ 1800 hrs. 18:00 - 19:00 1.00 MOB PRE Install the 2nd annulus valve. 19:00 - 21:30 2.50 MOB PRE Bridle down while taking on seawater to the pits. 21:30 - 23:00 1.50 WHSUR DECOMP Rio up and perform MIT on the OA to 2000 psi for 30 minutes and chart. Good test. 23:00 - 23:30 0.50 WHSUR DECOMP Rig up on the cellar and prepare to reverse circulate. 23:30 - 00:00 0.50 WHSUR N SFAL DECOMP Respond to 2 bbl leak into secondary containment outside the pits, located the leak in the outside wall of the pill pit. 2/9/2009 00:00 - 01:00 1.00 WHSUR N SFAL DECOMP Wait on SRT to come and investigate our 2bbl seawater spill. After looking at the spill location and talking about our plan on how to dispose of the frozen seawater. We were given the go ahead to continue. 01:00 - 06:00 5.00 WHSUR P DECOMP Rig up DSM lubricator and test to 500 si. Had issues due to the cold, but after steaming the tree, the BPV pulled free with no issue. Close the master valve, bleed off the tree, and rig down DSM. 06:00 - 07:00 1.00 WHSUR P DECOMP Pre-Job safety meeting and Pre-Spud meeting. 07:00 - 08:30 1.50 WHSUR P DECOMP Rig up to kill the well. 08:30 - 11:30 3.00 WHSUR P DECOMP Reverse circulate 38bbls of diesel out of the tubing at 169 gpm@ 600 psi. Shut down and switch lines to pump down tubing 310bb1s ~ 242gpm and 600psi. All returns out to the cuttings tank. 11:30 - 12:00 0.50 WHSUR P DECOMP Install the TWC 12:00 - 14:00 2.00 WHSUR P DECOMP Test TWC x IA from below to 3500 psi for 30 minutes. Good Test. Test from above to 1000 psi for 10 minutes. Good test. 14:00 - 17:00 3.00 WHSUR P DECOMP Nipple down the tree and remove it from the cellar. Functiori all lock down screws. 17:00 - 20:00 3.00 WHSUR P DECOMP Nipple up the BOP stack, install the turnbuckles, riser, and mousehole. Air up the boots and fill stack with water to check for leaks. 20:00 - 21:30 1.50 WHSUR P DECOMP Pick up 4" test joint and make up crossover to hanger, TIW, and dart valve. 21:30 - 22:30 1.00 WHSUR P DECOMP Conduct a body test on the BOP stack to 250 psi/3500 psi high. Good test 22:30 - 00:00 1.50 WHSUR N WAIT DECOMP Wait on AOGCC Rep. Jeff Jones to arrive to begin the BOPE test. 2/10/2009 00:00 - 03:30 3.50 BOPSU P DECOMP Test BOPE to 250 PSI low 3500 PSI hi hand Hydril to 250 PSI low, 2500 PSI high as per AOGCC. Test witnessed by Jeff Printed: 3/6/2009 1:43:59 PM • • BP EXPLORATION Page 2 e, Operations .Summary Report Legal Well Name: B-10 Common W ell Name: B-10 Spud Date: 9/20/1978 Event Nam e: REENTE R+COM PLET E Start : 2/8/2009 End: Contractor Name: NABOR S ALASK A DRI LLING I Rig Release: 3/2/2009 Rig Name: NABOR S 2ES Rig Number: I Date From - To Hours Task Code NPT Phase Description of Operations 2/10/2009 00:00 - 03:30 3.50 BOPSU P DECOMP Jones with AOGCC. Test witnessed by WSL Chris Kobuck and Tourpusher Ken Helf. Tested the choke manifold, manual and hydraulic choke, HCR, Kill, and dart valve. All tests were ', good. At approx. 03:30 while tightening the unibolt on the kill line, the driller attempted to pump through the choke line and it was found that the choke line and the kill line were froze up. 03:30 - 08:45 5.25 BOPSU N SFAL DECOMP Thaw kill & choke lines. Blow kill and mud lines. Place another tioga heater in the cellar. 08:45 - 09:45 1.00 BOPSU N WAIT DECOMP Wait for arrival of AOGCC Rep to continue testing. 09:45 - 13:30 3.75 BOPSU P DECOMP Continue testing BOPE with 4" test joint & LD. PU 4-1/2" test joint, test top rams -fail. Witnessed by Jeff Jones AOGCC. 13:30 - 15:30 2.00 BOPSU P DECOMP C/O top rams with spare 3-1/2" x 6" variables. 15:30 - 18:00 2.50 BOPSU P DECOMP Contacted AOGCC Rep John Crisp. Fill stack & lines & start low pressure test while waiting on AOGCC Rep to arrive on location. Finish testing BOPE except for lower VBR's. Witnessed by John Crisp, AOGCC Rep. L/D testing tools. 18:00 - 20:30 2.50 BOPSU P DECOMP RU DSM. Remove TWC. RD DSM. 20:30 - 21:30 1.00 BOPSU P DECOMP PJSM with all personnel plus Dan Hebert and Clyde Treybig. 21:30 - 22:30 1.00 PULL P DECOMP MU landing joint and RIH to tubing hanger. BOLDS. Pull hanger to floor. PU - 90k. 22:30 - 00:00 1.50 PULL P DECOMP CBU - 443 gpm ~ 364 psi. LD hanger and landing joint. 2/1 i/2009 00:00 - 07:00 7.00 PULL P DECOMP Pull 4-1/2" killstrin from 5880' and LD. 07:00 - 08:30 1.50 PULL P DECOMP RD tubing handling equipment. Clean and clear rig floor. 08:30 - 09:30 1.00 BOPSU P DECOMP RU and test lower set of rams to 250/3500 psi. Good test. RD testing equipment. 09:30 - 10:00 0.50 DHB P DECOMP Install wear ring. ID - 8.75". 10:00 - 16:00 6.00 DHB P DECOMP PU and RIH with RBP retrieval tool. Single in with DP to 5963'. PU - 115k; SO - 110k. Establish circulation C~ 477 gpm; 1252 psi. 16:00 - 17:00 1.00 DHB P DECOMP Circulate and condition hole. 17:00 - 17:30 0.50 DHB P DECOMP Unlatch RBP at 5963'. PU to 130k, plug free. Immediately get a kick with 75% return flow. Open choke, close preventer, SI well. 11 bbl gain in pits. 17:30 - 00:00 6.50 DHB P DECOMP Monitor casing and drillpipe pressures. SICP - 220 psi; SIDPP - 80 psi. Establish circulation @ 3 bpm, 200 psi. Circulate surface to surface sweep through the Gas Buster. SI well. SICP - 280 psi; SIDPP - 30 psi. Monitor for 25 minutes. SICP - 390 psi; SIDPP - 100 psi. Begin second circulation through the gas buster. Establish circulation C~? 3 bpm, 250 psi. SICP and SIDPP still do not match. 120 bbls lost during circulation. Notif Chuck Scheve at AOGCC of event. Close choke and bullhead C~3 98 gpm, 591 psi to displace remaining 147 bbls of well displacement below RBP. 2/12/2009 00:00 - 08:00 8.00 DHB P DECOMP Continue bullhead ~ 98 gpm. At 350 bbls bullheaded, pump pressure @ 850 psi. SI well. SICP - 860 psi, SIDPP - 740 psi. Monitor for 12 minutes. SICP - 660 psi, SIDPP - 490 psi. Open choke and pump 6 bbls. SICP - 120 psi, SIDPP - 20 psi. CBU ~ 120 gpm with SICP - 220 psi, SIDPP - 150 psi. Lose 45 bbls. Max SICP - 550 psi before dropping to 270 psi then re-climbing to 350 psi. Shut down. SICP - 350 psi, SIDPP - 70 Printed: 3/6/2009 1:43:59 PM • BP EXPLORATION Page 3 o#~.a' Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: REENTER+COMPLETE Start: 2/8/2009 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/2/2009 Rig Name: NABOBS 2ES Rig Number: Date From- To ,Hours Task ~ Code NPT' Phase Description of Operations 2/12/2009 00:00 - 08:00 8.00 DHB P DECOMP psi. Monitor for 10 minutes. SICP - 430 psi, SIDPP - 110 psi. Reset RBP at 5962' MD and release. Test to 2000 psi from above for 10 min -good test. CBU C~ 126 gpm. Monitor well - no flow. 08:00 - 10:00 2.00 DHB N WAIT DECOMP Wait on orders from town. Circulate to prevent freeze up of lines ~ 122 gpm, 220 psi. 10:00 - 12:00 2.00 DHB P DECOMP Pump dry job and POH from 5962' to 2808'. Found two bad joints and replaced -galled threads. 12:00 - 16:30 4.50 DHB P DECOMP RIH from 2808' to 5959' picking up DP singles. Install TIW valve. PU - 110k, SO - 110k. 16:30 - 18:00 1.50 DHB P DECOMP Swap well above RBP to 9.0 pp brine. Circulate ~ 580 gpm, 1725 psi. 18:00 - 21:30 3.50 DHB P DECOMP Build 700 bbls and receive additional 580 bbls of 9.0 ppg brine for bullhead operation. 21:30 - 22:00 0.50 DHB P DECOMP PJSM. 22:00 - 00:00 2.00 DHB P DECOMP Unlatch RBP, close preventer, and PU 3' to open RBP bypass valve. o pressure on surface, open preventer. PU 10' past set depth and close preventer. Bullhead 402 bbls, pumping 2 bpm @ 1160 psi through the drillpipe and 7 bpm ~ 1520 psi through the IA. Monitor well. Pressures bleeding down with SICP matching SIDPP. Bleed down pressures and open preventer. Establish circulation C~ 304 gpm, 630 psi and CBU. At 250 bbls of 350 bbls displacement, gain 12 bbls with gas at surface. SI well and circulate through the gas buster for the remainder of the BU. SICP - 310 psi. SIDPP - 195 psi. 2/13/2009 00:00 - 01:30 1.50 DHB P DECOMP Continue circulating. At BU, SICP - 340 psi, SIDPP - 195 psi. At BU + 38 bbls, SICP - 355 psi, SIDPP - 185 psi. At BU + 53 bbls, SICP - 355 psi, SIDPP - 185 psi. SI and monitor well for 10 minutes. SIDPP bled from 80 psi to 50 psi. SICP bled from 350 psi to 340 psi. 01:30 - 03:00 1.50 DHB P DECOMP PJSM. RU to strip in hole. Resume circulation to prevent freezing of lines, taking returns through gas buster while rigging up. At 2:00, SIDPP - 160 psi, SICP - 100 psi. SI well and monitor for 15 minutes. SIDPP - 0 psi, SICP - 0 psi. Open preventer. Fluid level not visible. Turn on hole fill pump and fill hole with 25 bbls. Monitor fluid level, no gas returns. Proceed to RIH, ready to strip in if necessary. 03:00 - 06:00 3.00 DHB P DECOMP RIH from 5959' to 9049'. Fill pipe with another 25 bbls. 06:00 - 09:00 3.00 DHB P DECOMP CBU plus 1000 stks. Circulate at 196 gpm, 360 psi until gas returns show. Take returns thru gas buster at 3 bpm, 290 psi. Set RBP and bullhead 100 bbls at 9 bpm with 2bpm, 960 psi thru the rillpipe an 7 pm, 1310 psi down the annulus to clear any gas below the RBP back in to the perfs. Bleed down all pressures to zero. Printed: 3/6/2009 1:43:59 PM • BP EXPLORATION Page 4 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: REENTER+COMPLETE Start: 2/8/2009 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/2/2009 Rig Name: NABOBS 2ES Rig Number: Date FFrom - To Hours Task Code NPT Phase Description of Operations __ _- ~ - _ 2/13/2009 09:00 - 10:00 1.00 DHB P DECOMP Release_R_BP and RIH to 9300' to verify we can get down to 10:00 - 16:30 6.50 DHB P DECOMP POH from 9300' to surface. Found washout in DP in pipe body of one joint and a second washout -washed tooljoint seal face when POH. LD bad joints. Lay down RBP and retrieving tools. Clean and clear rig floor. 16:30 - 19:30 3.00 DHB N RREP DECOMP Repair hydraulic leak on top drive. 19:30 - 22:00 2.50 BOPSU P DECOMP RU test 'oint and test the followin BOPE: 4" dart valve, Choke manifold valve #7, Top Rams, 4" TIW, HCR choke, annular preventer. Test witness waived by AOGCC rep Jeff Jones. Test witnessed by BP WSL Travis Peltier and NAD Driller Matt Turcotte. RD test equipment. 22:00 - 00:00 2.00 DHB P DECOMP MU EZSV & running tool and RIH to 1030'. 2/14/2009 00:00 - 05:00 5.00 DHB P DECOMP RIH with EZSV from 1030 to 9300'. Set EZSV. 05:00 - 05:45 0.75 REMCM P DECOMP Rig up to establish injection pressures for cement squeeze. Monitor for signs of flow up the annulus -None. 05:45 - 06:00 0.25 REMCM P DECOMP PJSM with crew and service companies for cement squeeze. 06:00 - 07:15 1.25 REMCM P DECOMP Displace DP to fresh water. Establish infectivity at 3 bpm - 1000 psi. Remain stung in to retainer for cement squeeze. 07:15 - 07:45 0.50 REMCM P DECOMP ine up to cementers. ump s res water. est lines to 4000 psi. 07:45 - 08:10 0.42 REMCM P DECOMP Mix & pump 40.5 bbls (195 sx) Class G slurry at 15.8 ppg. 3 bpm at 730 psi at start. 3 bpm at 200 psi at end. Follow with 10 bbls fresh water to clear lines. 08:10 - 08:40 0.50 REMCM P DECOMP Switch to rig pump. Displace & squeeze cement to perfs. 3 bpm at 75 psi at start. 3 bpm at 65 psi at 500 stks. 3 bpm at 55 psi at 1000 stks. 3 bpm at 500 psi - 1100 stks. 3 bpm at 600 psi - 1150 stks. 2 bpm at 680 psi - 1200 stks. 2 bpm at 750 psi - 1250 stks. 2 bpm at 790 psi - 1260 stks. 2 bpm at 820 psi - 1270 stks. 2 b mat 840 si - 1285 stks and SD s ueeze. 08:40 - 09:00 0.33 REMCM P DECOMP Pull up and unsting from retainer. Mousehole top single and RD cement line and head pin. Pull 3 stands slowly and allow remaining 8 bbls of cement to fall on top of retainer - approx 100' in 9 5/8" casing. 09:00 - 10:30 1.50 REMCM P DECOMP POH to 9028'. Pump 20 bbl nutplug sweep and circulate ~ 530 gpm, 2450 psi to clean out drillpipe and excess cement. 10:30 - 12:30 2.00 REMCM P DECOMP POH from 9028' to 4566'. Brine flowing up drillpipe -well out of balance. 12:30 - 13:00 0.50 REMCM P DECOMP CBU at 400 gpm, 800 psi. At 12:30, roustabout (spill champion) was on his walk around the rig and saw brine leaking out of pits on back side of complex. Shut down pump, and brine still leaking. Lowered fluid level in trip tank and leak stopped. x5700 called and Spill Response Team responded. 1 bbl spill on pad covering 100 sq. ft. Printed: 3/6/2009 1:43:59 PM ~J 2.50 CLEAN 2.50 CLEAN 1.00 CLEAN 2.00 CLEAN 2.50 CLEAN 1.50 CLEAN 4.50 DHB BP EXPLORATION Operations Summary Report Page 5 Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: REENTER+COMPLETE Start: 2/8/2009 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/2/2009 Rig Name: NABOBS 2ES Rig Number: 2/1 4/2009 12:30 - 13:00 0.50 REMC~ 2/15/2009 00:00 - 02:30 Date From.- To ,Hours Task 13:00 - 16:00 3.00 REMCi\ 16:00 - 21:00 5.00 CLEAN 21:00 - 21:30 0.50 CLEAN 21:30 - 00:00 02:30 - 03:30 03:30 - 05:30 05:30 - 08:00 08:00 - 09:30 09:30 - 14:00 14:00 - 15:00 15:00 - 19:00 19:00 - 21:30 21:30 - 00:00 2/16/2009 00:00 - 02:30 02:30 - 08:30 08:30 - 09:30 09:30 - 10:30 10:30 - 18:00 ~ - ~~ a.-f 18:00 - 19:00 19:00 - 20:00 20:00 - 21:30 21:30 - 22:00 22:00 - 23:30 23:30 - 00:00 Code ~ NPT Phase Description of Operations P DECOMP Continue to CBU. P DECOMP POH from 4566'. LD EZSV running tool. Clean and clear rig floor. P DECOMP MU 9-5/8" cleanout BHA and RIH to 6505'. P DECOMP Circulate SS polymer sweep at 500 gpm, 1750 psi. PU - 150k, SO - 125k. N RREP DECOMP POH from 6505' to 3621' laying down drillpipe. N RREP DECOMP POH from 3621' to 740' laying down drillpipe. N RREP DECOMP RIH with drillpipe in derrick from 740' to 4272'. P DECOMP Cut and slip 80' of drilling line. Service top drive. N RREP DECOMP POH from 4272' to 740' laying down drillpipe. P DECOMP Laydown cleanout BHA. P DECOMP RU E-line. RIH with GR/CCL and EZSV bridge plug. Log hole from 6000' to 5500'. Set EZSV with top at 5759' - 4.5' above a coupling. Test EZSV for 5 mins to 3500 psi - OK. RD SWS. 1.00 DHB P DECOMP Test EZSV for 30 mins at 3500 psi -good test. 4.00 DHB N RREP DECOMP Remove all fluids from pits. Jack pits up and pull herculite under pits. Build berm around entire pit module with 8x8 timbers. 2.50 DHB N RREP DECOMP Load shed with 4" 14# HT-40 S-135 drillpipe and tally pipe, Refilling pits while loading and tallying drillpipe in shed. 2.50 STWHIP P WEXIT MU whipstock BHA and RIH to 124'. 2.50 STWHIP P WEXIT Continue to MU whipstock BHA and RIH to 859'. 6.00 STWHIP N RREP WEXIT RIH picking up 4" 14# HT-40 drillpipe 1x1 to 5746'. Fill pipe and circulate 2 drillpipe volumes every 30 jts. PU - 135k, SO - 120k. 1.00 STWHIP P WEXIT Orient whipstock 56 degrees left. SO 18k and shear to set anchor at 5760'. Overpull 10k to verify set -good set. SO 35k to shear off milling assembly. PU - 135k, SO - 120k. 1. 0 I WEXI Displace well to 9.0 ppg L ND. irculate 450 gpm. 7.50 STWHIP P WEXIT Mill window. TOW = 5737'. BOW = 5753'. Drill new hole from 5753' to 5777'. PU - 135k, SO - 120k, RT - 125k. Circulate at 500 gpm, 1410 psi. RPM - 100, TO - 5k. Some cement seen during milling operations. Work mills through window with no pump or rotation. No PU or SO changes, window looks good. Recovered 325 Ibs of metal. POH to 5723'. 1.00 STWHIP P WEXIT Circulate super sweep around at 500 gpm, 1390 psi. 1.00 STWHIP P WEXIT Attempt FIT two times to 11.5 ppg EMW, LOT performed, On first attempt, well pressured up slowly to 200 psi after 40 strokes. Bleed off and attempt FIT again. On second attempt, well broke down at 450 psi on the Martin-Decker, EMW - 10.6. Mud weight in & out - 9.0 ppg. 1.50 STWHIP P WEXIT Pump dry job and POH from 5723' to 4882'. Well swabbing on way out. Suspect balled up mill and BHA. 0.50 STWHIP P WEXIT Circulate at 500 gpm, 1390 psi attempting to remove balling material. 1.50 STWHIP P WEXIT POH from 4882' to 3850'. Well still swabbing. 0.50 STWHIP P WEXIT Circulate 40 bbl SAP and nutplug sweep at 500 gpm, 1140 psi, attempting to un-ball mills. Printed: 3/6/2009 1:43:59 PM TREE= 4-1/16"CNV WELLHEAD= MCEVOY ACTUATOR= BAKER C KB. ELEV = 64.3' BF. ELEV = 37.24' KOP = 2800' Max Angle = 61 ° @ 7000' Datum MD = 11190 Datum TVDss= 9162' DRLG ~ DRAFT B-10A SAFE~TES: 4-1/2" CHROMETBG &LNR 13-3/8" CSG, 72#, -~ 2675' L-80 BTRS, ID = 12.347" Expected TOC behind 9-5/8" casin 5414' Minimum ID = 3.725" ~ 10478' 4-1/2" HES XN NIPPLE 9-5/8" WHIPSTOCK ~ , ~5 ' 9-5/8" EZSV 9-5/8" ¢sv 9300' 4-112^ TUBING STUB (XX/XX/XX) 93$4' MILLOUT WINDOW (B-10A) 5737' - 5753' 10299' --+4-1/2" HES X NIP, ID = 3.813" I 10371 7" X 4-1 /2" BKR S-3 PKR, ID = 3.870 10405' 4-1 /2" HES X NIP, ID = 3.813" 10478' I-i 4-1 /2" HES XN NIP, ID = 3.725" ~ 9-s/a^ csG, a~#, L-ao BTRS, ID = s.6ar I~ 10011' PERFORATION SUMMARY REF LOG: A NGLE AT TOP PERF: ~ Note: DA 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" 10490 7" LNR, 29#, L-80 BTGM, .0383 bpf , ID = 6.276" 10645' 4-1/2" CSG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" ~~ 11190' DATE REV BY COMMENTS DATE REV BY COMMENTS 10!24/78 ? ORIGINAL COMPLETION 07/11/90 N1 ES RWO CORRECTION (11/16!06) 04/10/08 D14 RWO SUSPENDED 03/02/09 N2ES SIDETRACK (B-10A) 03/05/09 PJC DRLG CORRECTIONS 03/07/09 DAV/PJC GLV C/O 10482 ~ 7" X 5" BKR G2 LNR TOP PKR, I it w /FLEX LOCK LNR HGR, ID = 4.400" 10490' 4-1/2" WLEG, ID = 3.958" 10501' 7" X 5" BKR FLIX-LOCK LNR HGR, ID = 6.31" 10511' 5" X 4-1/2" XO, ID = 3.958" i 10561' PBTD PRUDHOE BAY UNff WELL: B-10A PERMIT No: 2082050 API No: 50-029-20321-01 SEC 31, T11N, R14E, 2069' FNL & 1611' FEL BP Exploration (Alaska) 2096 9-5/8" FOC 2219' 4-1/2" HES X NIP, ID = 3.813" 2306' 9-5/8" DV COLLAR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3452 3445 12 KBG2 DOME BK 16 03/07/09 3 6318 5699 61 KBG2 SO BK 20 03/07/09 2 9150 7239 30 KBG2 DMY BK 0 02/26/09 1 10220 8240 18 KBG2 DMY BK 0 02/26/09 5578 -j 9-5/8" X 7" BKR HRD ZXP LTP, ID = 6.28" I 5594 9-5/8" X 7" BKR FLIX LOCK HGR, ID = 6.31" 9200 TOP OF CEMENT Nabors 2ES Well B-l0a Well Control Incident Page 1 of 2 • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Tuesday, February 17, 2009 9:22 AM To: 'Hobbs, Greg S (ANC)'; (NSUADWDrIgRig2es@bp.com) Cc: DOA AOGCC Prudhoe Bay Subject: RE: Nabors 2ES Well B-10 (178-054) Well Control Incident Dick and Greg, Thanks for the info regarding the incident at 2ES. Look at the record, it probably would have been appropriate to set the retainer and cement in April 2008. One other item, since the original well had not been plugged, the incident and work up to milling the window are considered to be accomplished in B-10 rather than B-10A (208- 205). Good luck with the operations. Call or message with any questions. Tom Maunder, PE AOGCC From: Regg, James B (DOA) Sent: Tuesday, February 17, 2009 8:44 AM To: Maunder, Thomas E (DOA) Subject: FW: Nabors 2ES Well B-10a Well Control Incident Jim Regg x ~' ~~B ~ "~ ~~o AOGCC 333 W.7th Avenue, Suite 100 Anchorage, AK 99501 907-793-1236 From: NSU, ADW Drlg Rig 2es [mailto:NSUADWDrIgRig2es@bp.com] Sent: Saturday, February 14, 2009 2:54 PM To: DOA AOGCC Prudhoe Bay Cc: Hobbs, Greg S (ANC) Subject: Nabors 2ES Well B-10a Well Control Incident Gentlemen, Well B-10A had been suspended by Doyon 14 in April 2008, with a Halliburton retrievable bridge plug in the 9 5/8" casing at 5963'. On February11th, 2009, at approx 17:00 hours, Nabors 2ES unseated this RBP prior to setting a cement retainer to squeeze off perfs in the old wellbore in preparation for a sidetrack. As soon as the RBP was unseated, significant flow from the wellbore was seen at surface. The well was immediately shut in using the annular preventer. At this point, SIDPP = 80 psi. SICP = 220 psi. In subsequent operations to circulate out the influx, the choke line HCR valve was operated as was the hydraulic choke and the valve downstream of the choke (valve #7 on the manifold). As part of the well control operation, a contingency was put in place to strip in the hole with drillpipe. A floor safety valve and a dart sub were run in the string as part of this plan, but stripping operations were ultimately unnecessary, and we were able to RIH to the previously cut tubing stub at 9354', to circulate out gas and bullhead additional fluid to the perts. 2/17/2009 Nabors 2ES Well B-l0a Well Control Incident Page 2 of 2 • At the end of the well control operation, the annular preventer was tested to 250/2500 psi. In addition, the choke line HCR, valve #7 on the choke manifold, the floor safety valve and the dart valve were each tested to 250/3500 psi. All tests passed. If any further information is needed, please let me know. Dick Maskell BPX Company Rep Nabors 2ES maskelcrC~bp.com Tel: 659-4103 Fax: 659-4177 2/ 17/2009 05`( SARAH PALIN, GOVERNOR ALASKA � *� AND T �+ A+�L7��AI��►�St�qKA�T 01% AND GAS 333 W. 7th AVENUE, SUITE 100 CGIM'ERVA.Ll O C01tMSSIOX ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 January 29, 2009 FAX (907) 276-7542 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7004 1160 0001 3621 1878 Harry Engel BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Request for Verification of Suspended, Shut -In and Observation Well Information Dear Mr. Engel: This letter supersedes our correspondence of January 28, 2009. Enclosed are lists of suspended, long term shut-in and observation wells operated by BP Exploration Alaska Inc. and BP Alaska Inc. For each list, please verify the information for each well, and provide any corrections by April 1, 2009. Location inspections required under 20 AAC 25.110 should be coordinated with Jim Regg at 907-793-1236 or jim.regg@alaska.gov. If you have any questions regarding this notice, please contact Tom Maunder at 907-793- 1250 or tom.maunder@alaska.gov. Sincerely, V/17;� Cathy7.Foerster Commissioner Enclosures NED CERTIFIED MAILT,,, RECEIPT (Domestic Mail Only, No Insurance Coverage Provided) a y A06JnABE AK -9,950-6h2" M Postage $ $0.59 054, r--1 E3 Certified Fee $2.70 O N� C3 Return Reclept Fee Required) 2 ( (Endorsement $2.20 0 9� � r cted Del very Fee Y (EndoRestrsement Required) $0.00 \�4 G ---- 901 PS Form 3800, June 2002 See Reverse for Instructions ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: /-/Qrr y gpx/v A. Signatu X Ag Ad B. Re eiv by (Printed lame) C. Date of A 4%. 1 t D. Is delivery ardress dint from item 1? ❑ Y, If YES, enter delivery address below: ❑ No 3. Se ce Type Q�Certified Mail ❑ Express Mail ❑ Registered —,FMeturn Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Transfer from service label) 7004 116 0 0001 3 6 21 1878 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 y A. Signatu X Ag Ad B. Re eiv by (Printed lame) C. Date of A 4%. 1 t D. Is delivery ardress dint from item 1? ❑ Y, If YES, enter delivery address below: ❑ No 3. Se ce Type Q�Certified Mail ❑ Express Mail ❑ Registered —,FMeturn Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Transfer from service label) 7004 116 0 0001 3 6 21 1878 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 Operator BP ALASKA INC Field Permit API Number PRUDHOE BAY Suspended, Shut In and Observation Wells Current Date of Well Name Status Status Surface Location .................................................... Lease(s)................................... 169-068-0 50-029-20036-00-00 PUT RIV 01-10-14 169-069-0 50-029-20037-00-00 PUT RIV 02-10-14 169-070-0 50-029-20038-00-00 PUT RIV 11-10-14 169-059-0 50-029-20033-00-00 PUT RIV 13-10-14 169-062-0 50-029-20034-00-00 PUT RIV 14-10-14 169-081-0 50-029-20043-00-00 PUT RIV 17-10-15 Thursday, January 29, 2009 OBSW 9/19/1975 555 FNL 710 FEL See 11 T ION R 14E UM OBSW 9/19/1975 555 FNL 820 FEL Sec 11 T ION R 14E UM OBSW 9/19/1975 555 FNL 930 FEL See 11 T ION R 14 E UM OBSW 9/19/1975 650 FSL 555 FWL Sec 13 T ION R 14E UM OBSW 9/19/1975 430 FSL 555 FWL Sec 13 T ION R 14 E UM OBSW 9/19/1975 755 FNL 600 FEL Sec 19 T ION R 15E UM Operator Suspended, Shut In and Observation Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location.._—_.. . ................. Lease(s)................................... *EXPLORATORY 198-252-0 50-089-20027-00-00 ENDICOTT 196-022-0 50-029-22644-00-00 MILNE POINT RED DOG 1 DUCK IS UNIT MPI 1-59/024 SUSP 4/2/1999 1682 FSL 4508 FEL Sec 34 T 10 N R 21 E UM SUSP 2/21/1996 3083 FSL 2202 FEL Sec 36 T 12 N R 16 E UM 196-009-0 50-029-22642-00-00 MILNE PT UNIT KR B-24 SUSP 3/3/1996 827 FSL 4289 FEL Sec 18 T 13 N R 11 E UM 199-091-0 50-029-21373-01-00 MILNE PT UNIT KR C -12A SUSP 7/13/2003 496 FSL 2027 FEL Sec 10 T 13 N R 10E UM 185-110-0 50-029-21364-00-00 MILNE PT UNIT KR C-16 SUSP 10/27/1993 610 FSL 2063 FEL Sec 10 T 13N R 10E UM 196-032-0 50-029-22650-00-00 MILNE PT UNIT KR K-25 SUSP 3/23/1996 3592 FSL 2078 FEL Sec 3 T 12 N R 11 E UM 197-080-0 50-029-22766-00-00 MILNE PT UNIT KR L-34 SUSP 12/1/2008 3285 FSL 5106 FEL Sec 8 T 13N R 10E UM 201-109-0 50-029-22768-01-00 MILNE PT UNIT KR L -35A SUSP 10/12/2002 3177 FSL 4937 FEL Sec 8 T 13 N R 10E UM 201-075-0 50-029-23012-00-00 MILNE PT UNIT SB 1-13 SUSP 8/19/2001 2346 FSL 1253 FWL Sec 33 T 13 N R 10E UM NORTHSTAR 200-211-0 50-029-22996-00-00 NORTHSTAR UNIT NS -26 SUSP 2/1/2001 1298 FSL 648 FEL Sec 11 T 13 N R 13 E UM 206-138-0 50-029-23325-00-00 NORTHSTAR UNIT NS -33 SUSP 4/26/2007 1369 FSL 650 FEL Sec 11 T 13 N R 13E UM PRUDHOE BAY 174-006-0 50-029-20133-00-00 E BAY ST 1 OBSW 10/6/1986 1536 FNL 635 FWL Sec 15 T 11 N R 15E UM 175-059-0 50-029-20177-00-00 GETTY STATE 1 OBSW 5/11/1980 1388 FSL 887 FWL Sec 2 T 10 N R 13E UM 180-092-0 50-029-20504-00-00 PBU MP 11-33-11-12 1 SUSP 4/29/1981 1966 FNL 1380 FEL Sec 33 T 11 N R 12 E UM 198-035-0 50-029-22866-00-00 PRUDHOE BAY UN BORE 02-01 SUSP 4/22/1998 453 FSL 4553 FWL Sec 19 T 12 N R 11 E UM 205-010-0 50-029-23245-00-00 PRUDHOE BAY UN BORE 1-100 SUSP 4/17/2006 3219 FSL 3945 FEL Sec 20 T 12 N R 11 E UM 189-075-0 50-029-21959-00-00 PRUDHOE BAY UN LIS 1-3-01 SUSP 9/13/1994 287 FNL 550 FWL Sec 22 T 11 N R 15E UM 189-104-0 50-029-21978-00-00 PRUDHOE BAY UN LIS L4-02 SI 12/8/1994 2426 FSL 2176 FEL Sec 24 T 11 N R 15E UM 202-002-0 50-029-22789-01-00 PRUDHOE BAY UN NIA NK -11A SUSP 2/22/2002 1312 FSL 1021 FEL Sec 36 T 12 N R 15E UM 206-031-0 50-029-22668-01-00 PRUDHOE BAY UN NIA NK -14A SUSP 5/4/2007 1358 FSL 944 FEL Sec 36 T 12N R 15E UM 197-158-0 50-029-22778-01-00 PRUDHOE BAY UN NIA NK -41A SUSP 11/2/1997 1474 FSL 717 FEL Sec 36 T 12 N R 15E UM 202-052-0 50-029-23072-00-00 PRUDHOE BAY UN NWE 04-01 SUSP 4/7/2002 3203 FSL 4003 FEL Sec 20 T 12 N R 11 E UM Thursday, January 29, 2009 Operator Suspended, Shut In and Observation Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... 201-222-0 50-029-23054-00-00 PRUDHOE BAY UN ORIN V-201 SUSP 1/25/2008 4838 FSL 1775 FEL Sec 11 T 11 N R 11 E UM 191-037-0 50-029-22146-00-00 PRUDHOE BAY UN PTM 12 SUSP 4/30/1991 1359 FSL 980 FEL Sec 16 T 12 N R 14 E UM 192-082-0 50-029-22283-00-00 PRUDHOE BAY UN PTM P2-55 SUSP 10/12/1992 565 FNL 4052 FEL Sec 14 T 12 N R 14 E UM 176-034-0 50-029-20208-00-00 PRUDHOE BAY UN WBH WBST-03 SUSP 7/26/1976 70 FSL 2000 FWL Sec 25 T 12N R 14E UM 170-040-0 50-029-20076-00-00 PRUDHOE BAY UNIT 01-05 SUSP 5/25/2007 547 FNL 1420 FWL Sec 8 T 10 N R 15E UM 200-126-0 50-029-22202-02-00 PRUDHOE BAY UNIT 02-30B SUSP 7/6/2007 154 FNL 774 FWL Sec 36 T 11 N R 14 E UM 195-024-0 50-029-20096-01-00 PRUDHOE BAY UNIT 04-04A SUSP 4/17/1995 916 FNL 382 FEL Sec 34 T 11 N R 15E UM 187-082-0 50-029-21744-00-00 PRUDHOE BAY UNIT 07-27 SUSP 9/4/1994 952 FNL 497 FWL Sec 34 T 11 N R 14 E UM 182-207-0 50-029-20878-00-00 PRUDHOE BAY UNIT 13-98 OBSW 1/17/1983 1405 FSL 361 FWL Sec 13 T 10 N R 14 E UM 201-148-0 50-029-20764-01-00 PRUDHOE BAY UNIT A -25A SUSP 11/22/2001 2651 FNL 1703 FEL Sec 35 T 11 N R 13E UM 178-054-0 50-029-20321-00-00 PRUDHOE BAY UNIT B-10 SUSP 4/10/2008 2070 FNL 1611 FEL Sec 31 T 11 N R 14 E UM 204-139-0 50-029-20654-02-00 PRUDHOE BAY UNIT E -18B SUSP 5/2/2008 1853 FNL 501 FEL Sec 6 T 11 N R 14 E UM 200-163-0 50-029-20600-01-00 PRUDHOE BAY UNIT G -13A SUSP 10/6/2008 2224 FNL 2368 FEL Sec 12 T 11 N R 13E UM 197-190-0 50-029-20487-01-00 PRUDHOE BAY UNIT H -10A SUSP 11/24/1997 1982 FNL 1264 FEL Sec 21 T 11 N R 13 E UM 180-067-0 50-029-20484-00-00 PRUDHOE BAY UNIT H-12 SUSP 7/22/1994 1762 FNL 1264 FEL Sec 21 T 11 N R 13 E UM 181-061-0 50-029-20591-00-00 PRUDHOE BAY UNIT H-15 SUSP 10/22/2004 1432 FNL 1265 FEL Sec 21 T 11 N R 13E UM 169-046-0 50-029-20026-00-00 PRUDHOE BAY UNIT J-04 OBSW 9/19/1975 970 FNL 1245 FEL Sec 9 T 11 N R 13 E UM 100-242-0 50-029-21821-00-00 PRUDHOE BAY UNIT OWDW-C SUSP 6/23/1973 651 FNL 1048 FEL Sec 11 T 10 N R 14E UM 194-144-0 50-029-22522-00-00 PRUDHOE BAY UNIT R-36 SUSP 11/1/2000 782 FSL 3629 FEL Sec 32 T 12 N R 13E UM 191-123-0 50-029-20765-01-00 PRUDHOE BAY UNIT S -10A SUSP 11/6/1991 1644 FNL 1745 FWL Sec 35 T 12 N R 12 E UM 204-071-0 50-029-20804-01-00 PRUDHOE BAY UNIT S -14A SUSP 12/18/2007 1651 FNL 2185 FWL Sec 35 T 12 N R 12 E UM 180-108-0 50-029-20511-00-00 PRUDHOE BAY UNIT TR 18-11-12 SUSP 12/24/1980 809 FSL 3893 FEL Sec 7 T 11 N R 12 E UM 180-066-0 50-029-20483-00-00 PRUDHOE BAY UNIT TR 3-10-12 SUSP 10/11/1980 1993 FNL 1479 FEL Sec 33 T 11 N R 12 E UM 169-104-0 50-029-20047-00-00 PRUDHOE BAY UNIT TR PR 33-12-13 SUSP 12/20/1969 683 FNL 755 FEL Sec 33 T 12 N R 13E UM 178-102-0 50-029-20356-00-00 PRUDHOE BAY UNIT TW -C SUSP 4/25/1979 1320 FSL 1321 FEL Sec 3 T 11 N R 12E UM 192-011-0 50-029-22244-00-00 PRUDHOE BAY UNIT U-01 SUSP 3/16/1992 5134 FNL 2498 FEL Sec 18 T 11 N R 13E UM 204-102-0 50-029-21947-01-00 PRUDHOE BAY UNIT W -09A SUSP 8/7/2006 1437 FNL 1194 FEL Sec 21 T 11 N R 12 E UM 179-031-0 50-029-20369-00-00 PRUDHOE BAY UNIT WGI-01 SUSP 8/28/2006 258 FNL 1209 FEL Sec 11 T 11 N R 14E UM 188-115-0 50-029-21558-01-00 PRUDHOE BAY UNIT Y -22A SUSP 10/29/1988 1394 FNL 132 FEL Sec 33 T 11 N R 13E UM 208-140-0 50-029-21883-01-00 PRUDHOE BAY UNIT Y -25A SUSP 11/14/2008 1403 FNL 169 FEL Sec 33 T 11 N R 13 E UM 202-046-0 50-029-22403-01-00 PRUDHOE BAY UNIT Y -37A SUSP 3/31/2002 1425 FNL 276 FEL Sec 33 T 11 N R 13 E UM Thursday, January 29, 2009 Operator Suspended, Shut In and Observation Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... 169-014-0 50-029-20011-00-00 SAG DELTA 31-11-16 SUSP 4/28/1969 1102 FNL 1743 FEL Sec 31 T 11 N R 16 E UM 186-056-0 50-029-20138-01-00 W BEACH ST 1-A SUSP 5/6/1986 70 FSL 1880 FWL Sec 25 T 12 N R 14 E UM PT THOMSON 196-008-0 50-089-20026-00-00 SOURDOUGH 3 SUSP 4/24/1996 2245 FSL 5068 FEL Sec 29 T 9 N R 24 E UM Thursday, January 29, 2009 0 14- I - SARAH FALIN, GOVERNOR ALASKA OIL AND GAS 333 W 7th AVENUE, SUITE 100 CONSERVATION COMDUSSION ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 January 28, 2009 FAX (907) 276-7542 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7005 1820 0001 2499 5951 Harry Engel BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Notice of Revised Suspended Wells Regulations and Request for Verification of Suspended and Shut -In Well Information SWNFp G C i iO 20'14 Dear Mr. Engel: Enclosed are the Alaska Oil and Gas Conservation Commission's revised regulations regarding suspended wells (i.e., 20 AAC 25.110). Also enclosed are a list of suspended wells and a list of long term shut-in wells operated by BP Exploration Alaska Inc. For each list, please verify the information for each well, and provide any corrections by April 1, 2009. Location inspections required under 20 AAC 25.110 should be coordinated with .11111 Regg at 907-793-1236 or jim.regg@alaska.gov. If you have any questions regarding this notice, please contact Tom Maunder at 907-793- 1250 or tom.maunder@alaska.gov. Sincerely, Cathy P. oerster Commissioner Enclosures It K complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. W. Print your name and address on the reverse so that we can return the card to you. K Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Harry Engel BP Exploration Alasl<a Inc. PO Box 196612 Anchorage AK 99519-6612 A, Sign ire tal GX Agent PISOW F" (Embr earns Reoli+dl ❑ Addressee B. R eived b ame) _ C. pate of D ery D. Is delivery address different from item 1? 0 Yes If YES, enter delivery address below: ❑ No rvice Type lbtot Poeeeps a F+-- I s Certified Mail ❑1 Express Mail ❑ Registered -kL Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Transfer from service label) 7005 1820 0001 2499 5951 PS Form 3811, February 2004 Domestic Return Receipt 102595.02-M-1540 Er -11EAtT-t ® tal Service— coAd" PISOW F" (Embr earns Reoli+dl $2.20 ® ru(ErdorsWOW E FIED MAIL. RECEIPT r -R lbtot Poeeeps a F+-- I s $5.49 Provided) Mail only: No insurance Coverage Er -11EAtT-t ® O~ Fee $2.70 coAd" PISOW F" (Embr earns Reoli+dl $2.20 ® ru(ErdorsWOW Raftled t dWY Fee tMaied) $0.00 r -R lbtot Poeeeps a F+-- I s $5.49 L U E. Ln Harry Engel a r`- rIK-7 BP Exploration Alaska Inc. orADBoiNo PO Box 196612 Anchorage AK 99519-6612 Operator Suspended and Shut In Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location.. . Lease(s).. ............................ 'EXPLORATORY 198-252-0 50-089-20027-00-00 RED DOG 1 ENDICOTT 196-022-0 50-029-22644-00-00 DUCK IS UNIT MPI 1-59/024 MILNE POINT 196-009-0 50-029-22642-00-00 199-091-0 50-029-21373-01-00 185-110-0 50-029-21364-00-00 196-032-0 50-029-22650-00-00 197-080-0 50-029-22766-00-00 201-109-0 50-029-22768-01-00 201-075-0 50-029-23012-00-00 NORTHSTAR 200-211-0 50-029-22996-00-00 206-138-0 50-029-23325-00-00 PRUDHOE 6A Y MILNE PT UNIT KR B-24 MILNE PT UNIT KR C -12A MILNE PT UNIT KR C-16 MILNE PT UNIT KR K-25 MILNE PT UNIT KR L-34 MILNE PT UNIT KR L -35A MILNE PT UNIT SB 1-13 NORTHSTAR UNIT NS -26 NORTHSTAR UNIT NS -33 SUSP 4/2/1999 1682 FSL 4508 FEL Sec 34 T 10 N R 21 E UM ADL0377013 SUSP 2/21/1996 3083 FSL 2202 FEL Sec 36 T 12 N R 16E UM ADL0312828 SUSP 3/3/1996 827 FSL 4289 FEL Sec 18 T 13N R 11 E UM ADL0047432 SUSP 7/13/2003 496 FSL 2027 FEL Sec 10 T 13N R 10E UM ADL0047434 SUSP 10/27/1993 610 FSL 2063 FEL Sec 10 T 13N R 10 E UM ADL0047437 SUSP 3/23/1996 3592 FSL 2078 FEL Sec 3 T 12 N R 11 E UM ADL0375133 SUSP 12/1/2008 3285 FSL 5106 FEL Sec 8 T 13N R 10 E UM ADL0025514 SUSP 10/12/2002 3177 FSL 4937 FEL Sec 8 T 13N R 10E UM ADL0025514 SUSP 8/19/2001 2346 FSL 1253 FWL Sec 33 T 13N R 10E UM ADL0025517 SUSP 2/1/2001 1298 FSL 648 FEL Sec 11 T 13N R 13E UM ADL0312799 SUSP 4/26/2007 1369 FSL 650 FEL Sec 11 T 13N R 13E UM ADLO321798 180-092-0 50-029-20504-00-00 PBU MP 11-33-11-12 1 SUSP 4/29/1981 1966 FNL 1380 FEL Sec 33 T 11 N R 12E UM ADL0047452 198-035-0 50-029-22866-00-00 PRUDHOE BAY UN BORE 02-01 SUSP 4/22/1998 453 FSL 4553 FWL Sec 19 T 12N R 11 E UM ADL0047446 205-010-0 50-029-23245-00-00 PRUDHOE BAY UN BORE 1-100 SUSP 4/17/2006 3219 FSL 3945 FEL Sec 20 T 12N R 11 E UM ADL0047446 189-075-0 50-029-21959-00-00 PRUDHOE BAY UN LIS 1-3-01 SUSP 9/13/1994 287 FNL 550 FWL Sec 22 T 11 N R 15E UM ADL0034631 189-104-0 50-029-21978-00-00 PRUDHOE BAY UN LIS 1-4-02 SI 12/8/1994 2426 FSL 2176 FEL Sec 24 T 11 N R 15E UM ADL0028323 202-002-0 50-029-2.2789-01-00 PRUDHOE BAY UN NIA NK -11A SUSP 2/22/2002 1312 FSL 1021 FEL Sec 36 T 12 N R 15E UM ADL0034629 206-031-0 50-029-22668-01-00 PRUDHOE BAY UN NIA NK -14A SUSP 514/2007 1358 FSL 944 FEL Sec 36 T 12 N R 15E UM ADL0034625 197-158-0 50-029-22778-01-00 PRUDHOE BAY UN NIA NK -41A SUSP 1112/1997 1474 FSL 717 FEL Sec 36 T 12 N R 15E UM ADL0312827 202-052-0 50-029-23072-00-00 PRUDHOE BAY UN NWE 04-01 SUSP 4/7/2002 3203 FSL 4003 FEL Sec 20 T 12 N R 11 E UM ADL0047446 201-222-0 50-029-23054-00-00 PRUDHOE BAY UN ORIN V-201 SUSP 1/25/2008 4838 FSL 1775 FEL Sec 11 T 11 N R 11 E UM ADL0028240 191-037-0 50-029-22146-00-00 PRUDHOE BAY UN PTM 12 SUSP 4/30/1991 1359 FSL 980 FEL Sec 16 T 12 N R 14 E UM ADLO375136 Wednevhq, January 14, 2009 ADL0034630 ADL0047447 Operator Suspended and Shut In Fells BP EXPLORATION (ALASKA) INC Field Permit API Number Well Name Current Date of Status Status Surface Location .................................................... Lease(s)................................... 192-082-0 50-029-22283-00-00 PRUDHOE BAY UN PTM P2-55 SUSP 10/12/1992 565 FNL 4052 FEL Sec 14 T 12 N R 14 E UM ADL0034622 176-034-0 50-029-20208-00-00 PRUDHOE BAY UN WBH WBST-03 SUSP 7/26/1976 70 FSL 2000 FWL Sec 25 T 12 N R 14 E UM ADL0034627 170-040-0 50-029-20076-00-00 PRUDHOE BAY UNIT 01-05 SUSP 5/25/2007 547 FNL 1420 FWL Sec 8 T 10 N R 15E UM ADL0028328 200-126-0 50-029-22202-02-00 PRUDHOE BAY UNIT 02-30B SUSP 7/6/2007 154 FNL 774 FWL Sec 36 T 11 N R 14 E UM ADL0028308 195-024-0 50-029-20096-01-00 PRUDHOE BAY UNIT 04-04A SUSP 4/17/1995 916 FNL 382 FEL Sec 34 T 11 N R 15E UM ADL0028324 187-082-0 50-029-21744-00-00 PRUDHOE BAY UNIT 07-27 SUSP 9/4/1994 952 FNL 497 FWL Sec 34 T 11 N R 14 E UM ADL0028309 201-148-0 50-029-20764-01-00 PRUDHOE BAY UNIT A -25A SUSP 11/22/2001 2651 FNL 1703 FEL Sec 35 T 11 N R 13E UM ADL0028286 178-054-0 50-029-20321-00-00 PRUDHOE BAY UNIT B-10 SUSP 4/10/2008 2070 FNL 1611 FEL Sec 31 T 11 N R 14 E UM ADL0028313 204-139-0 50-029-20654-02-00 PRUDHOE BAY UNIT E -18B SUSP 5/2/2008 1853 FNL 501 FEL Sec 6 T 11 N R 14 E UM ADL0028304 200-163-0 50-029-20600-01-00 PRUDHOE BAY UNIT G -13A SUSP 10/6/2008 2224 FNL 2368 FEL Sec 12 T 11 N R 13E UM ADL0028304 197-190-0 50-029-20487-01-00 PRUDHOE BAY UNIT H -10A SUSP 11/24/1997 1982 FNL 1264 FEL Sec 21 T 11 N R 13E UM ADL0028283 180-067-0 50-029-20484-00-00 PRUDHOE BAY UNIT H-12 SUSP 7/22/1994 1762 FNL 1264 FEL Sec 21 T 11 N R 13E UM ADL0028283 181-061-0 50-029-20591-00-00 PRUDHOE BAY UNIT H-15 SUSP 10/22/2004 1432 FNL 1265 FEL Sec 21 T 11 N R 13E UM ADL0028283 100-242-0 50-029-21821-00-00 PRUDHOE BAY UNIT OWDW-C SUSP 6/23/1973 651 FNL 1048 FEL Sec 11 T 10 N R 14 E UM ADL0028311 194-144-0 50-029-22522-00-00 PRUDHOE BAY UNIT R-36 SUSP 11/1/2000 782 FSL 3629 FEL Sec 32 T 12 N R 13E UM ADL0028279 191-123-0 50-029-20765-01-00 PRUDHOE BAY UNIT S -10A SUSP 11/6/1991 1644 FNL 1745 FWL Sec 35 T 12N R 12 E UM ADL0028257 204-071-0 50-029-20804-01-00 PRUDHOE BAY UNIT S -14A SUSP 12/18/2007 1651 FNL 2185 FWL Sec 35 T 12 N R 12E UM ADL0385193 180-108-0 50-029-20511-00-00 PRUDHOE BAY -UNIT TR 18-11-12 SUSP 12/24/1980 809 FSL 3893 FEL Sec 7 T 11 N R 12E UM ADL0028262 180-066-0 50-029-20483-00-00 PRUDHOE BAY UNIT TR 3-10-12 SUSP 10/11/1980 1993 FNL 1479 FEL Sec 33 T 11 N R 12 E UM ADL0047454 169-104-0 50-029-20047-00-00 PRUDHOE BAY UNIT TR PR 33-12-13 SUSP 12/20/1969 683 FNL 755 FEL Sec 33 T 12 N R 13E UM ADL0028278 178-102-0 50-029-20356-00-00 PRUDHOE BAY UNIT TW -C SUSP 4/25/1979 1320 FSL 1321 FEL Sec 3 T 11 N R 12E UM ADL0028261 192-011-0 50-029-22244-00-00 PRUDHOE BAY UNIT U-01 SUSP 3/16/1992 5134 FNL 2498 FEL Sec 18 T 11 N R 13E UM ADL0028283 204-102-0 50-029-21947-01-00 PRUDHOE BAY UNIT W -09A SUSP 8/7/2006 1437 FNL 1194 FEL Sec 21 T 11 N R 12E UM ADL0047453 179-031-0 50-029-20369-00-00 PRUDHOE BAY UNIT WGI-01 SUSP 8/28/2006 258 FNL 1209 FEL Sec 11 T 11 N R 14 E UM ADL0028302 188-115-0 50-029-21558-01-00 PRUDHOE BAY UNIT Y -22A SUSP 10/29/1988 1394 FNL 132 FEL Sec 33 T 11 N R 13E UM ADL0028288 208-140-0 50-029-21883-01-00 PRUDHOE BAY UNIT Y -25A SUSP 11/14/2008 1403 FNL 169 FEL Sec 33 T 11 N R 13E UM ADL0028287 ADL0028288, 202-046-0 50-029-22403-01-00 PRUDHOE BAY UNIT Y -37A SUSP 3/31/2002 1425 FNL 276 FEL Sec 33 T 11 N R 13E UM ADL0028287 ADL00474 i 169-014-0 50-029-20011-00-00 SAG DELTA 31-11-16 SUSP 4/28/1969 1102 FNL 1743 FEL Sec 31 T 11 N R 16E UM ADL0028343 186-056-0 50-029-20138-01-00 W BEACH ST 1-A SUSP 5/6/1986 70 FSL 1880 FWL Sec 25 T 12 N R 14 E UM ADL0034628 PT THOMSOM W'ad'ap d4y, Anmarp 1-1, A09 Operator Suspended and Shut In Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s).................................. 196-008-0 50-089-20026-00-00 SOURDOUGH 3 SUSP 4/24/1996 2245 FSL 5068 FEL Sec 29 T 9 N R 24 E UM ADL0343112 JVcdne.wblp, JOnUari' 14. 2009 • ~ ~- . ~ ~.d ~ .d e__..,a s t.., :~~ iw.~ ~ ~~ k.~ ~. {.. ~t ,f` f_1 • ~ ` ~ t. 11 ~ . I' ,: ,, ~ i I ~ r ~ 5 SARAH PALIN, GOVERNOR ALASSA OII, A1~TlD (~5 333 W 7th AVENUE, SUITE 100 CO1~T5ER~ATIOPIT COl-'II-IISSIOI~T ANCHORAGE, ALASKA 99501-3539 !f PHONE (907) 279-1433 Greg Hobbs FAx (so7) 27sasaz Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 x ~ w ~, L- (, ~ ~~~ Anchorage, AK 99519-66 "`~~~~~ ~. `(~ ~~ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B-10 Sundry Number: 308-456 Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Coxrunission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:3p PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ,/ Chair DATED this ~ ~ day of December, 2008 Encl. ~;~'~ b , STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COM~SSION ,/ ~ l- ,^- APPLICATION FOR SUNDRY APPROVAL ~`~ ~Jtr1~- ~n aac ~~ ~Rn ~~ /o? ~~8 ~~ b~ w'~ 1. Type of Request:~Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ®Re-Enter Suspended Well ^ Change Approved Program ~ I Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 178.054 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20321-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU B-10 Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): - o ADL 028313 64.3' Prudhoe Bay Field / Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11100' ~ 9405' ~ 10604' - 9049' - Yes, See Diagram -9350' D B r » 7' 1-/" 27' 75' 430 In 1 11' 47 n r 7" '-1 1 2 '- 816 7 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10310' - 10398' 8837' - 8901' Kill String: 4-1/2", 12.6# L-80 5881' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker'HB-Ret' packer; Packers and SSSV MD (ft): 9428': 7" x 4-1/2» Baker'SAB' Perm packer 10336' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: January 6, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Jovy Roach, 564-4352 Printed Name Greg bs ~ Title Engineering Team Leader Prepared By Name/Number: Signature ,~ Phone 564-4191 Date ~' /~,~ Terrie Hubble, 564-4628 m Commission Use Onl Sundry Number: , Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity .BOP Test ^ Mechanical Integrity Test ^ Location Clearance ~fJc roc. Z ~ ~'1~sCr`~J t~ C~c Gl~ ~ ~~'ni~~~ ~~~ {--~y~. Other: r' ~'~~ D~C ~ ~ s. d~c~~ ®PS~ ~`~i ~.~r~1i1Y~ 3S~© ~Sh~ 'nG.1~`~S'~ t c~ Subsequent Form Required: l~Qr-~ APPROVED BY j ~ ~ (~' ~ A roved B COMMISSIONER THE COMMISSION Date / ` Form 10-403 Devised 06/2006/ Submit In Duplicate ~ 4 {~ A L - ~~~ ~ ~ ~~ . z~Qe • by B-10A Rig Sidetrack Well Type: Producer Current Status: This well is completed with 4-1/2" L-80 tubing and is currently shut-in with a kill string and an RBP at 5971' MD. Request: Plug and abandon wellbore in preparation for sidetrack. Well History: B-10 was shut-in for TxIA communication in July 2006. Subsequent diagnostics confirmed that a RWO was the only option for returning this well to service. A RWO to replace corroded tubing on parent well B- 10was started in April 2008. During the decompletion phase of the RWO, a length of corroded tubing was left in the well, and fishing operations commenced to recover the corroded tubing debris. Probability of completing the workover was considered very low, and the RWO was aborted. NOTE: It was not possible to test the 9-5/8" production casing pre RWO due to an obstruction at +/- 8454'MD. The Rig tested PC during RWO ops and determined there is a PC leak above 8343' dd and below 5971' dd. Other Requests: T+h:~ `~5 t~cc,y~~~'~ `~ Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams: That lowest set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three-ram drilling BOP stack. Scope of Work: Plug and Abandon: 1. MIRU Nabors 2ES. 2. Pull kill string at 5881' and RBP at 5971'. 3. Set cement retainer at approximately 9300' MD. Establish injectivity through cement retainer. a. If able to establish injectivity, P&A through cement retainer with cement volume adequate to fill from perforations to retainer if pressures allow. Release retainer and set 100' cement on top. b. If unable to establish injectivity, set retainer and place 100' of cement on top of retainer. 4. Set RTTS and find PC leak depth. Set EZSV, whipstock. Mill window and drill sidetrack. MASP: 2420 psi • Pre-rip prep work: O 5 Bleed OA and IA to zero psi. PPPOT - IC (9-5/8") 3500 psi, PPPOT-T (4-1/2") 5,000 psi. Function all lock-down screws. O 6 Pressure test the OA (13-3/8" casing) to 2000 psi for 30 minutes. CMIT T x IA to 3,500 psi for 30 minutes. O 7 Bleed all casin and annulus ressures to zero. Ensure BPV in tubin han er. Secure well. O 8 Remove the well house. Level the pad. Provide total well preparation cost on the handover form. Rip Operations: 1. MI / RU. Pull BPV. 2. Circulate out diesel freeze protection and displace the well to seawater. Install TWC and test. 3. MIT-OA to 2000 psi for 30 min charted. 4. Nipple down tree and adapter. Nipple up and test BOPE to 3,500psi. Pull TWC. 5. R/U. Pull 4 ~/z" tubing (kill string) from 5881'. 6. With RBP as barrier, ND BOPs and change-out 9-5/8" pack-offs. Test packoff. NU and test BOPs. 7. RIH and pull RBP from 5971'. 8. MU 8-1/2" clean-out assembly and clean-out the 9-5/8" casing down to the top of tubing stub at 9354' MD. 9. RIH with cement retainer to 9300 MD. Perform injectivity test on TxIA and record LLR. 10. If injectivity is confirmed, squeeze cement through retainer to P&A wellbore. Pull up above retainer and lay cement to leave 100' of cement above retainer. If no injectivity established, set cement above retainer only. 11. RIH with RTTS to 7350' and pressure test 9-5/8" casing above RTTS to confirm IA leak is below whipstock setting depth. If test fails, move up in 500' increments until pressure test passes. Note: If leak is found above KOP, plan to run 7" liner to 150' above leak depth. From 04/08 RWO, leak depth should be below 5971' MD. 12. RU E-line and RIH with 9-5/8" GR/JB & GR/CCL below whipstock setting depth ~ 7350' MD in ~h~ ~ G preparation to set EZSV for whipstock. ~~p~J~.\ 13. With E-line, set 9-5/8" CIBP at ~ 7360' to allow fora 7350' MD whip-stock KOP (max hole angle 41.05 degrees at 6685' MD). Pressure test casing. 14. P/U and RiH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whipstock and set on bridge plug at 7350' MD. Shear off of whip stock. 5. D si place the well to LSND milling fluid. Mill the window and 20' new formation. Perform LOT. 16. RIH w/ 8'/i" DIR/GR/Res drilling assembly and drill to top Sag River. POH. 17. Run and cement 7" L-80 BTC-M drilling liner. 18. RIH with 6 1/8" bit /motor assembly with GR/Res/Den/Neu to landing collar. 19. Test casing to 3500 psi. Drill shoe tract. 20. Displace the well to 8.4 ppg Flo-Pro drilling fluid. Drill 20' formation; perform FIT. ~~~ ~~ 21. Drill ± 700' to TD at 10973 MD in Zone 2. 22. Circulate, short trip, spot liner running pill, POOH. 23. Run and cement a 4'/z", 12.6#, 13-Cr-80 Vam Top solid production liner. POOH. 24. R/U and run 4 1/2", 12.6#, 13-Cr-80 VamTop completion tubing. Land tubing, RILDS. 25. Reverse circulate inhibited seawater to the packer depth. 26. Drop ball & rod and set packer and individually test the tubing and annulus to 3,500 psi 30 minutes. Record each test. 27. Shear the DCK valve and pump each way to confirm shear. 28. Set a TWC and test to 1000 psi. 29. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. Pull TWC w/lubricator. 30. Freeze protect the well to --2,200' 31. Install BPV and secure the well. 32. Rig down and move off. • Estimated Pre-rig Start Date: 1 /6/2009 Estimated Spud Date: 2/6/2009 Drilling Engineer: Jovy Roach (907) 242 - 6259 Production Engineer: AI Schmoyer (907) 564 - 5865 Geologist: Cole Abel (907) 564 - 4476 ATTACH: Current Schematic Proposed Schematic TREE=° 7-1/16" CM/ DRLG DRAFT WELLHEAD= MCEVOY ACTUATOR= OTIS KB. ELEV = 64.29' BF. ELEV = 37.24' KOP = 2800' Max Angle = 45 @ 11000' Datum MD = 10348' DatumTVDss= 8800' 13-3/8" CSG, 72#, L-80, ID = 12.347" ~4-1/2" KILL STRING TBG, 12.6#, L-80, ID = 3.958" f B-~ ~ SIJ~'ENDED 04/10/08 1958' --~4-1/2" HES X NIP, ID = 3.813" 2306' 9-5/8" DV PKR 5869' I" 'L4-112" HES X NIP, ID = 3.725" 5880' 4-1/2" WLEG, ID = 4.00" 5971' 9-5/8" HES RPB (04/08/08) 9354' TBG STUB (LAST TAG ON 04/07/08) GAS LIFT MANDRELS 9373) 8053 ~ 43 ~ OTIS) DMY) RM ( 0 )07/' IGINAL TBG STRING 402' 4-1/2" PKR SWS NIP, ID = 3.813" 406' 4-1/2" BKR PBR SEAL ASSY, ID = 4.0" 7" TBG STUB, 26#, L-80, .0383 bpf, ID = 6.276" TOP OF 7" LNR 9-5/8" CSG, 47#, L-80, ID = 8.681 " PERFORATION SUMMARY REF LOG: BRCS, 10/15/78 ANGLE AT TOP PERF` 43 @ 10354 Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 10296 - 10320 S 2-7/8" 6 10310 - 10330 C 03/18/01 5" 4 10320 - 10330 C 5" 4 10354 - 10370 C 05/22/00 2-1/2" 4 10370 - 10398 C 05/02/96 4" 4 10416 - 10426 S 4" 4 10442 - 10450 S 4" 4 10465 - 10480 S 04/01 /96 ~ 4-1 /2" LNR 12.6#, L-80, .0152 bpf, ID = 3.958" ~-~ 10344' ~ PBTD H 10604' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11100' 428' H 9-5/8" x 4-1 /2" BKR HB-RET PKR ID = 4.0" 10276' -~4-1/2" OTIS XA SLIDING SLV, ID = 3.813" 10283'-10289' MERLA TBG PATCH, ID = 3.25" 10291'-10335' 4-1 /2" TDS, BLA ST JOINT, ~ = 3.959" 10306' 7" MA RKER JOINT 10336' 7"x4-1/2" BAKER SAB PERM PKR 10343' 4-1/2" OTIS 'XN' NIP, ID = 3.725" 10344' 4-1/2" WLEG, ID = 3.958" 10347' ELMD - LOGG® 10409' FISH - 79' TBG-CONVEYED 5" PERF GUN '~ 7" PERMANENT BRIDGE PLUG ? 7" PERMANENT BRIDGE PLUG DATE REV BY COMMENTS DATE REV BY COMMENTS 10/24/78 ORIGINAL COMPLETION 04/10/08 GBMISL KILL STRING (RWO ATTEINPT 07/11/90 HS/PAG RWO CORRECTION (11/16/06) 04/20/08 JDMITLH DRAWING CORRECTIONS 03/26/01 RN/TP CORRECTIONS 11/01/01 WB/TP SURF LOC CORRECTION 07/18/06 CJWPJC GLV GO 10/20/06 HS/PAG PERF CORRECTION (10/18/06) PRUDHOE BAY UNfT WELL: B-10 PERMIT No: 178-0540 API No: 50-029-20321-00 SEC 31, T11N, R14E BP Exploration (Alaska) TREE = 4-1/16" CAM B ~ 10 A SA F OTES Drlg DRAFT 2100' 4-1/2" X-NIP, ID = 3.813" 2306' 9-5/8" DV PKR 2675' 13-3/8" CSG, 72At, L-80, ID = 12.347" Minimum ID = 3.725" ~ 10069' XN Nipple TBD 7x9-5/8" Liner hanger /packer 7350' KOP • ... O .. • • ~ ^- 9979' 41/2' HES X NP, ID= 3.813" • - 9999' 7" X 41 /2" BKR S-3 PKR ~ - 10029' 41/2" HES X NP, ID = 3.813" ~ s ' ~ - 10069 41/2" HE.S XN Nom, ID = 3.725" ~ 1 . • • _ 10093' WLEG ~ 10113' HangerlL'ner top packer 1 • ~ ~ 10263' 7" CSG, 26# L-80, BTGM .0383 bpf ELLHEAD= MCEVOY ACTUATOR= OTIS KB. ELEV = 64.29' BF. ELEV = 37.24' KOP = 7350' Max Angle = 47.7 @ 9348' Datum MD.~ 10550' Datum TVDss= 8800' GA S LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3 2 1 ~9-5/8" Whipstock 9-5/8" EZSV TOC above cement retainer 141 /2" Tubna Stub from Jet Cut I 9-5/8" CSG, 47#, L-80, ~ = 8.681 " PERFORATION SUMMARY REF LOG: A NGLE AT TOP PERF: ~ Note: S¢E SPF NJTERVAL OpNSgz DATE 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11100' ~~• ~•" ~a s .. .. ~~ ;, DATE REV BY COMMENTS DATE REV BY COMMENTS 10/24/78 ORIGINAL COMPLETION 07/11/90 IiS/PAG RWO CORRECTION (11/16/06) 03/09/08 LH/PJC JET CUT 09!24/08 JER Drilling Draft X41/2" LNR, 12.6M, 13-G-80 ~ PRUDHOE BAY UNff WELL: B-10A PERMff No: 178-0540 API No: 50-029-20321-01 SEC31, T11N, R14E BP Exploration (Alaska) _~ STATE OF ALASKA S- ALAS~IL AND GAS CONSERVATION CO SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~ V G ~i~Y 1 9 2008 ss Cans. Commission 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ®Suspended zoAAC zs.~os zoAAC zs.»° ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1 b. Well Class: Al1C i'a 2 ®Development ~ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aba~~~ 4/10/2008 12. Permit to Drill Number 178-054 308-128 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 09!20!1978- 13. API Number _ 50-029-20321-00-00 4a. Location of Well (Governmental Section): Surface: 2070' FNL 1611' FWL SEC 7. Date T.D. Reached 10/15/1978- 14. Well Name and Number: PBU B-10 r , , . 31, T11N, R14E, UM Top of Productive Horizon: 288' FNL, 615' FWL, SEC. 05, T10N, R14E, UM 8. KB (ft above MSL): 64.3 Ground (ft MSL): 37.24 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 876', FNL, 871' FWL, SEC. 05, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 10604' 9049' Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 664056 y- 5948581 Zone- ASP4 10. Total Depth (MD+TVD) 11100' 9405' 16. Property Designation: ADL 028313 TPI: x- 666371 y- 5945133 Zone- ASP4 Total Depth: x- 666642 y- 5944550 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ^Yes ®No u mit electronic nd rint d inf rmati n r 20 AAC 25.0 0 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIL, SP, BHCS, GR, FDC, CNL, CAL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 30" x 2 Insulate onductor Surfa 11 urf ce 11 279 Arcti 13-3/8" 72# L-80 Surface 2675' Surface 2675' 17-1/2" 5964 cu ft P rmafrost II 9-5/8" 47# L-80 Surface 10011' Surface 8617' 12-1/4" 1797 cu ft Class'G' Permafrost'C' 7" 2 -80 9493' 111 8 2 ' 9405' -1/2" 1 I 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH .SET MD PACKER .SET MD 4-1/2", 12.6#, L-80 Kill String 5881' MD TVD MD TVD 4-1/2", 12.6#, L-80 -9350' - 10344' 9428', 10336' 2-7/8" GD 6 SPF 2-718" GD 6 SPF 2-1/2" GD. 4SPF 2-1/2" GD. 4SPF 25 ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10310' - 10330' 8837' - 8851' 10371)' - 10398' 8880' - 8901' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 5" GD 4 SPF 5" GD 4 SPF 2000' Freeze Protected with 140 Bbls Diesel . . 5971' Set 9-5/8" HES Retrievable Bridge Plug 10320' - 10330' 8844' - 8851' 10354' - 10370' 8869' 8880' - 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUrS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press: CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical resuks per 20 AAC 250.071. ~AMPLE7!(}N None U .p ~p~~iNNE~ JUL ~ ~ 2008 Form 10-407 Revised 02/20 ~ ~ ~ ~ r, f ~ t CONTINUED ON REVERSE SIDE ~~~~ ~~~' '~~~ ~ 1 ~~~~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS A KERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Test ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River SST 10024' 8627' None Shublik 10063' 8655' Ivishak 10172' 8735' Formation at Total Depth (Name): 30. List of Attachments: Summary of Daily Drilling Reports, Well Work Summary and a Well Schematic Diagram. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. I ~y Signed Sond Stewma Title Drilling Technologist Date"! `~ '~~ PBU B-10 178-054 308-128 Prepared By Name/Number. Sondra Stewman, 564-4750 Well Number P mlit No. /A rOV81 N Drilling Engineer: pawl Chan, 564-5254 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only TREE= 7-1/16" CM/ WELLHEAD= MCEVOY C~CTUATOR= OTIS KB. ELEV = 64.29' BF. ELEV - 37.24' KOP = 2800' Max Angle = 45 @ 11000' Datum MD _ 10348' Datum TVDss= 8800' 13-3/8" CSG, 72#, L-80, ID = 12.347" 2675' ~4-112" KILL STRING TBG, 12.6#, L-80, ID = 3.958" ~ ~~ ~ ~ ~ B~~ O ..~ c ~ . ,, 1 .: 158` -~4-112" HES X NIP. ID = 3.813" 2306' 9-5/8" DV PKR 5869' -j 4-1/2" HES X NIP; ID = 3.725" 5880` 4-112" WLEG, ID = 4.00" 5971' 9-5.?8" HES RPB (04108108} 9354' TBG STUB {LAST TAG ON 04!07!08) GAS LIFT MANDRELS MD TVD DEV TYPE VLV LATCH PORT DATE "1 ~ 9373 ~ 8053 ~ 43 ~ OTIS ~ DMY ~ RM ~ 0 ~ 07/ '"`ORIGINAL TBG STRING 9402' 4-1/2" PKR SWS NIP, ID = 3.813" 9406' 4-1/2" BKR PBR SEAL ASSY, ID = 4.0" 9428' 9-5/8" x 4-1/2" BKR HB-RET PKR, ID = 4.0" I7" TBG STUB, 26#, L-80, .0383 bpf, ID = 6.276" ~ 9478' TOP OF 7" LNR 9493' 9-5/8" CSG, 47#, L-80, ID = 8.681" 10011' PERFORATION SUMMARY REF LOG: BHCS, 10/15/78 ANGLE AT TOP PERF: 43 @ 10354 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8' 4 10296 - 10320 S 2-7/8" 6 10310 - 10330 C 03/18/01 5" 4 10320 - 10330 C 5" 4 10354 - 10370 C 05/22/00 2-1/2" 4 10370 - 10398 C 05/02/96 4" 4 10416 - 10426 S 4" 4 10442 - 10450 S 4" 4 10465 - 10480 S 04/01 /96 4-1/2" 612.6#, L-80, .0152 bpf, ID = 3.958" ~-j 10344' PBTD ~ 10604, 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11100' 10276' 1~4-1/2" OTIS XA SLIDING SLV, ID = 3.813" 10283'-10289' MERLA TBG PATCH, ID = 3.25" 10291'-10335' 4-1/2" TDS, BLAST JOINT, ID = 3.959" 10306' 7" MARKERJOINT 10336' 7"x4-1/2" BAKER SAB PERM PKR W/ANCHOR, ID = 4.0" 10343' 4-1 /2" OTIS 'XN' NIP, ID = 3.725" 10344' 4-112" WLEG, ID = 3.958" 10347' ELMD -LOGGED 10409' FISH - 79' TBG-CONVEYED 5" PERF GUN 7" PERMANITIT BRIDGE PLUG 7" PERMANEM BRIDGE PLUG DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfT 10/24/78 ORIGINAL COMPLETION 04/10/08 GB/WSL KILL STRING (RWO ATTEM PT) WELL: B-10 07/11/90 HS/PAG RWO CORRECTION (11/16/06) 04/20/08 JDNVTLH DRAWING CORRECTIONS PERMIT No: 178-0540 03/26/01 RN/TP CORRECTIONS API No: 50-029-20321-00 11/01/01 WB/TP SURF LOC CORRECTION SEC 31, T11N, R14E 07/18/06 CJN/PJC GLV C/O 10/20/06 HS/PAG PERF CORRECTION (10/18/06) BP Exploration (Alaska) Digital Well File Well: B-10 Well History Well Date Summary B-10 2/27/2008 ***WELL S/I ON ARRIVAL***( PRE RWO ) DRIFT TUBING W/ 3.70" CENT & SAMPLE BAILER SD @ 8474' SLM HANG UP OIL JARS NOT WORKING, SPANG FOR 45 MIN. JAR DOWN HARD SEVERAL TIMES TOOLS COME FREE. NO SAMPLE RECOVERED IN BAILER ****WELL S/I ON DEPARTURE*** (NOTIFIED PAD OPERATOR ) B-10 3/6/2008 ****WELL SHUT IN ON ARRIVAL**** INITIAL T/I/O = 1650/1700/0 PSI CUT 4.5" TUBING AT 8420' IN MIDDLE OF FIRST FULL JOINT ABOVE OBSTRUCTION WITH 3.65" POWER CUTTER. HAD MISFIRE, DUE TO CUT O-RING IN FIRING HEAD AND FLIUD WAS ABLE TO ENTER INSIDE THE TOOLSTRING ***JOB CONTINUED ON 07 MAR 08*** 6-10 3/7/2008 T/I/0= SSV/1760/0 Temp = SI MIT-OA PASSED to 2000 osi. (Pre-RWO) Pumped 1.5 bbls of 38*F crude to achieve test pressure. OA lost 60 psi in 1st 15 mins, OA lost 20 psi 2nd 15 mins for a total loss of 80 psi in 30 min test. Bled back to final WHP= SSV/1760/0. Annulus casing valves are open to gauges. B-10 3/7/2008 ***CONTINUED FROM 06-MAR-08*** CUT 4.5" TUBING AT 8420' IN THE MIDDLE OF THE FIRST FULL JOINT ABOVE OBSTRUCTION. PAD OP NOTIFIED UPON DEPARTURE. WELL LEFT SHUT IN. FINAL T!I/O =1700!1750/0. ***JOB COMPLETE*** B-10 3/22/2008 T/I/0= 1500/1500/100 Temp= S/I Double truck well kill (RWO expense) LRS unit 70 and T-98 cost information recorded, pump data recorded in LRS unit 46 AWGRS. *** Job continued on 3-23-08*** B-10 3/22/2008 T/I/0=1500/1500/100 Temp=S/I Load & Kill TBG & IA (Pre RWO) Spot up equipment. Grease crew services wing valve. ****Continued on 03-23-08 WSR**** B-10 3/23/2008 *** Job continued from 3-22-08 WSR*** Double truck well kill (RWO expense) LRS unit 70 and T-98 cost information recorded, pump data recorded in LRS unit 46 AWGRS. B-10 3/23/2008 ****Continued from 03-22-08 WSR**** Double Truck Load & Kill- T&IA (Pre RWO) Pumped down TBG w/ 5 bbls neat meth spear, 545 bbls 2% KCL, 22 bbls Flow-Pro, 88 bls 2% KCI, 5 bbls neat meth & 31 bbls DSL (FP). Pumped down IA w/ 5 bbls neat meth spear, 619 bbls 2% KCL, 78 bbls Flow-Pro, 294 bbls 2% KCL, 5 bbls neat meth & 107 bbls DSL (FP). Pumped down both TBG & IA at same time, to space Flo- Pro in similar position in well. ***Tags hung, Casing valves tagged & open to gauges. FWP= 820/820/0 B-10 3/23/2008 T/I/O = 800/800/0+. Temp SI. TBG, IA & OA FL (pre FB). TBG FL @ 1860'. IA FL @ 2100'. OA near surface. SI the SSV & bled the void between the SSV & Wing valve to 0 psi. The flow line is @ 500 psi. Monitored for 30 min. The void remained 0+ & the flow line remained @ 500 psi. Final WHP's = 800/800/0+. B-10 3/24/2008 T/I/0=0/0/0, Temp=S1. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: Opened bleeder screw to check test void pressure, bled to 0 psi. Removed internal check and installed Alemite external check. Function LDS, 3 pins were tight but moving, all other pins moved freely with no sign of bent or broken pins. Pumped through void until clean fluid returns were achieved. Pressured void to 5000 psi for 30 min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Opened bleeder screw to check test void pressure, bled to 0 psi. Removed internal check and installed Alemite external check. Function LDS, all pins moved freely with no sign of bent or broken pins. Pumped through void until clean fluid returns were achieved. RU elephant gun, pumped 1 stick of plastic to energize secondary Y seal. Pressured void to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 20 psi in second 15 min (PASS). Bled void to 0 psi. B-10 3/24/2008 Well Kill -Frozen tanker due to Schlumberger B-10 3/24/2008 T/I/0=750/750/40 Temp= S/I Double truck load and kill, TxIA (RWO expense) Pumped down TBG with 5 bbls meth, 632 bbls 2% KCL, 142 bbls Flo-Pro, 102 bbls 2% KCL, 5 bbls meth, spacer 30 bbls diesel. Pumped down IA with 5 bbls meth, 735 bbls 2% KCL, 253 bbls Flo-Pro, 330 bbls 2% KCL, 5 bbls meth, spacer 107 bbls diesel. Monitor well head psi 30 min Pumped down TBG and IA simultaneously to position Flo-Pro at similar depths in TBG and IA. Final Whp's=vac/vac/0 casing valves open to gauge's B-10 3/26/2008 Set 6 3/8" CIW BPV for Pre Rig.. T/I/0= 0/0/0. Set @ 108" http://digitalwellfile.bpweb.by.com/WIInfo/Reports/ReportViewer. aspx Page 1 of 2 5/16/2008 Digital Well File • B-10 3/28/2008 pulled 6" CIW BPV thru tree,tagged Cam? 108" w/2' exten. for Doyon 14 B-10 3/29/2008 pulled 6" CIW TWCV thru stack w/25' of exten. tagged C~ 108" B-10 4/10/2008 T=O. Set 4 1/8" CIW "H" BPV thru tree for rig to move off well. 1 - 2' ext used. Tag at 102". No problems. R. Bryan Print Date: 5/16/2008 Page 1 of 1 http://digitalwellfile.bpweb.by.com/WIInfo/Reports/ReportViewer. aspx Page 2 of 2 5/16/2008 • B'P EXPLORATION Page 1 of 14 Operations Summary Report Legal Well Name: B-10 Common W ell Name: B-10 Spud Date: 9/20/1978 Event Nam e: WORKO VER Start : 3/26/2008 End: Contractor Name: DOYON DRILLIN G INC . Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours ', Task Code NPT Phase Description of Operations -__ _. 3/26/2008 06:00 - 12:00 6.00 RIGD P PRE String line to UD Top drive. Remove torque tube. -UD IBOP. Remove Kelly hose. Remove service loops. -Install Bail lock. Unhook Stand jump Rams. -Remove O.D.S. Top roller on Top Drive. -Remove rail brace. UD Top Drive. -Hook up carriage to blocks. Unhook lights and camera. -Raise & pin "C" section. 12:00 - 14:00 2.00 RIGD P PRE Continue to pin "C" section. Hook up Bridle line. -Install layover line on front Wind walls. -Blow down Rig floor. 14:00 - 14:30 0.50 RIGD P PRE PJSM. R/D lines and hoses to Skid Rig floor. -R/D Gas buster line. Skid Rig floor. 14:30 - 18:00 3.50 RIGD P PRE Move Rock washer. -Prepare and L/D Wind walls. 18:00 - 21:00 3.00 RIGD P PRE Lay Derrick over. -Jack up Rig. Move to end of location. 21:00 - 00:00 3.00 MOB P PRE Depart DS # 9 and travel to B-Pad. 3/27/2008 00:00 - 01:30 1.50 MOB P PRE Move Rig from DS # 9 to Ice Road at Sag river. 01:30 - 04:00 2.50 MOB P PRE Move Rig to within 1 mile of West side Guard shack. 04:00 - 10:00 6.00 MOB P PRE Continue Rig move onto B -Pad. 10:00 - 12:00 2.00 RIGU P PRE Spot Rig on B -Pad. -Raise Derrick. 12:00 - 14:00 2.00 RIGU P PRE Raise Wind walls onto Derrick. 14:00 - 15:00 1.00 RIGU P PRE Skid Rig floor back into position. 15:00 - 17:30 2.50 RIGU P PRE Unbridle. Lower "C" section. -Hang Bridle lines. 17:30 - 00:00 6.50 RIGU P PRE Remove Trolley from Traveling Blocks. -Hang Top Drive. Install braces on bottom of Top Drive rails. -Install Wind wall braces. Install roller above Beaver slide. -M/U Mud manifold. Hang Rig tongs. -Install Kelly hose. Slide cuttings conveyor into place. -Rig upTop Drive. 3/28/2008 00:00 - 04:00 4.00 WHSUR N WAIT DECOMP Accept Rig & place Rig on Stand by. -Waiting on Pad prep to move Rig over well. -Bring Subs & pipe handling equipment to rig floor. 04:00 - 05:00 1.00 WHSUR P DECOMP Spread herculite around well cellar. -Blow down Rig floor. 05:00 - 08:00 3.00 WHSUR P DECOMP Skid Rid floor. -Continue to spread herculite. -Lay Rig mats around well cellar. -Position Rig near well cellar. 08:00 - 10:30 2.50 WHSUR P DECOMP Move Rig over well. -Shim substructure to level Rig into place. 10:30 - 11:30 1.00 WHSUR P DECOMP Mat, Berm & Spot Rock washer into position. 11:30 - 12:30 1.00 WHSUR P DECOMP Skid Rig floor in final position. 12:30 - 13:30 1.00 WHSUR P DECOMP Hook up Rig floor service lines. -Take on heated (140 F) - 3% KCI to the pits. 13:30 - 15:30 2.00 WHSUR P DECOMP P/U & R/U DSM lubricator. Remove flanges from Tree. -Install pump-in flanges. -Test lubricator to 500 si / 5 minutes -Pass. -Pull BPV. 15:30 - 17:00 1.50 WHSUR P DECOMP R/U lines, valves T's & hoses to circulate out diesel. -Pressure test lines with air. Printed: 4/21/2008 1:16:00 PM • BP EXPLORATION Page 2 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code's NPT ' Phase I Description of Operations 3/28/2008 15:30 - 17:00 1.50 WHSUR P DECOMP -Heat lines with steam. -Test lines to 3,500 psi -Pass. 17:00 - 20:00 3.00 WHSUR P DECOMP Circulate (120 F) 3% KCI down annulus. Returns to Tiger tank. -Got returns after 49 bbls pumped. -Pump rate 210 gpm / 500 psi. -Continue to pump 40 bbls to displace diesel out of Tbg. -Total 3% KCI pumped is 89 bbls. -Shut down. R/U to pump down Tbg. -Pump (120 F) 3% KCI down Tbg. Returns to tiger tank. -Got returns after 15 bbls pumped. -Pump rate 210 gpm / 500 psi. -Continue to pump 156 bbls to displace diesel out of annulus. -Total pumped = 260 bbls. Shut down & blow down. -Wait 30 minutes for diesel to migrate. -Pumped an additional 82 bbls for the well bore to clean up. -Total KCI oumoed =342 bbls. -Total KCL lost to formation =64 20:00 - 20:30 0.50 WHSUR P DECOMP Blow down and rig down circulating lines, valves & T's. 20:30 - 21:30 1.00 WHSUR P DECOMP Install TW on i 4 ar.M TA/!` fa.rr. ~ti,,.,~+., ~ inn .,~~ _ to ,.,~.,~~+o~ _ -R/D test equipment. 21:30 - 00:00 2.50 WHSUR P DECOMP PJSM on N/D Tree & Adaptor flange. -Sim Ops: -Tighten IBOP and secure Top Drive, test run same. -N/D Tree & adaptor flange. P/U XO for Tbg Hanger. -Turn IJ4S XO 7 turns into Tbg hanger. -Plug off control lines. Check LDS. -Install Spacer spool. 3/29/2008 00:00 - 04:00 4.00 WHSUR P DECOMP N/U BOP's & Kill line. -N/U & install extension in Choke hose. ---BOP Configuration: -Hydril GK 13 5/8" 5000. -3 1/2" X 6" Variables. -Blind Rams. -Drilling Spool. -2 7/8" X 5" Variables. 04:00 - 05:00 1.00 WHSUR P DECOMP M/U XO on test jt. Install test jt in Stack. 05:00 - 11:00 6.00 WHSUR P DECOMP Test BOP and related equipment. -Test per BP / AOGCC procedures and regulations. -Test to 250 psi low - 3,500 psi high, for 5 min each on chart. -Test Hydril w/ 4" test jt. -Test Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13 &14. -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP. -TIW & Dart valves. -All Pass -Test top and bottom rams w/ 4" test joint and 4-1/2" test joint - Pass. -Perform accumulator test. Test witnessed by WSL and Toolpusher. -Test witness waived by John Crisp AOGCC. 11:00 - 11:30 0.50 WHSUR P DECOMP R/D BOP test equipment. Printed: 4/21/2008 1:16:00 PM BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code. NPT Phase Description of Operations 3/29/2008 11:30 - 14:30 3.00 WHSUR P DECOMP P/U & R/U lubricator & extension. -Test lubricator to 500 psi / 5 minutes -Pass -Pull TW_C.. 14:30 - 15:00 0.50 WHSUR P DECOMP Install Bails, Elevators. P/U 1 jt of 4" D.P. 2 XO's. -Screw into Hanger 7 turns. 15:00 - 15:30 0.50 WHSUR P DECOMP Back out Lock down screws. Pull Hanger to Rig floor. -Pulled 165K to break free. Pull Tbg to Rig floor ~ 140K. 15:30 - 17:00 1.50 WHSUR P DECOMP Break circulation. Hole took 46 bbls to fill. -Pump Safe Surf-O & Safe Scav sweeps. Circulate sweeps surface to surface (7600 strokes). -Noted Safe Surf-O sweep returns at 1400. 3700 & 7.600 strokes. -Pump rate 334 gpm / 100 psi. 17:00 - 17:30 0.50 WHSUR P DECOMP UD Hanger, XO's, 1 jt of 4" D.P. Blow down Top Drive. -Change out elevators. R/U Csg equipment. 17:30 - 00:00 6.50 WHSUR P DECOMP PJSM on pulling & laying down questionable condition Tbg. -Pull & UD 171 'ts of 4 1/2", 17#, L-80 TDS Tbg. -Multi le holes noted in Tb . -Fluid lost for day= 85 bbls. -Total fluid lost to well= 149 bbls. 3/30/2008 00:00 - 03:00 3.00 WHSUR P DECOMP Continue to lay down 4 1/2" Tbg. -Total Tbg pulled = 210 jts. 2- pups (9.90' & 5.93'). -1 cut jt pulled ~ 22.41' - 2 splits (apprx 1 1/2" long) in bell of cut. -Average bell = 5", maximum bell = 5 1/4". -Also recovered - 2 GLMs, 1 SSSV, 3 SS bands, 27 rubber clamps. 03:00 - 03:30 0.50 WHSUR P DECOMP Clear Rig floor of Tbg tools. 03:30 - 04:30 1.00 WHSUR P DECOMP Clean Rig floor. Pressure wash mats. 04:30 - 05:00 0.50 FISH P DECOMP Install wear ring. 05:00 - 05:30 0.50 FISH P DECOMP P/U Baker tools to Rig floor: -8 1/8" Over Shot Guide w/ Hollow Mill Container. -4 1/2" basket grapple and MCP. 05:30 - 07:00 1.50 FISH P DECOMP MU 8 1/8" O.S. w/ HMC and 4 1/2" basket rapple and MCP.. -P/U B.S. jars & DC's to 310' md. 07:00 - 13:30 6.50 FISH P DECOMP P/U 4" DP f/ pipeshed to 8,422' md. 13:30 - 14:30 1.00 FISH P DECOMP Screw in T.D., obtain parameters. -PUW= 175k, SOW= 148k, ROW= 162k w/ 3k Tq. -Wash down and tap T.O.F. at 8.436' md_ -Pump rates 84 gpm / 80 psi. 169 gpm / 240 psi. -P/U and rotate down w/ 40 rpm- Mill on T.O.F. w/ 0-2k WOB- Weight fell off. -Attempt to slide_oyer C~ 8.436' and w/ no scr_oasc.- __ _ __ -Rotate down w/ 10 rpm, 3-5k Tq. -Swallow 7.5' to 8,443' and cutlip guide depth-P/U w/ no overpu . -PU 12' -Set back down in same place. 14:30 - 17:30 3.00 FISH P DECOMP Observe well (static). Blow down Top Drive . -POH f/ 8,436' to 310' and 17:30 - 19:30 2.00 FISH P DECOMP Rack back D.C's. Pull up & break off fish. -Recovered: 1-GLM C~ 19.20' & Cut jt (stump) ~ 17.10'. Printed: 4/21/2008 1:16:00 PM BP EXPLORATION Page 4 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT ' Phase Description of Operations 3/30/2008 17:30 - 19:30 2.00 FISH P DECOMP -Redress Overshot w/ new grapple. -RIH w/ Fishing Assy, BHA & 1 Std of D.P. 19:30 - 21:30 2.00 FISH P DECOMP PJSM on cutting Drilling lirie. -Cur Drlg line, service Top Drive and Blocks. -Cut line length= 158'. Adjust brakes. 21:30 - 00:00 2.50 FISH P DECOMP RIH w/ 4" D.P. f/ 405' to 8,400' md. -Fluid lost for day= 134 bbls. -Total fluid lost to well= 283 bbls. 3/31/2008 00:00 - 00:30 0.50 FISH P DECOMP RIH t Fi h 8 476' md. 00:30 - 01:00 0.50 FISH P DECOMP Obtain parameters. PUW= 172k, SOW= 150k, ROT wt= 162k. -Tq= 2k @ 40 RPM. Pump rate 126 gpm / 160 psi. -Mill top of Fish f/ 8.476' to 8.483' md. -Slide down 7' no rotary P/U w/ 3k-5k overpull (175k+). 01:00 - 04:00 3.00 FISH P DECOMP POH w/ Fishing Assy on 4" D.P. f/ 8,483' md. 04:00 - 04:30 0.50 FISH P DECOMP Stand back D.C's. Pull out fishing tools - No fish. 04:30 - 07:00 2.50 FISH P DECOMP Break off Cut lip guide. Inspect Grapple - OK -Mobilize tools to floor -MU 8 1/2" x 7" washover shoe & extensions -MU 8 1/8" O.S. w 5 1 4" grapple, 3- O.S. top extensions -PU B.S., jars- RIH w/ 4 3/4" DC's 07:00 - 10:00 3.00 FISH P DECOMP RIH w/ 4" D.P. to 8,476' md. 10:00 - 11:00 1.00 FISH P DECOMP Screw in T.D.- Obtain parameters -PUW 173k -SOW 150K -ROW 163k w/ 60 rpm, 3k Tq -Wash over T.O.F. w/ 3 bpm 290 psi ~ 8476' md. -Taking weight- Rotate pipe 1 turn, continue wash down. -Taking weight -Rotate pipe 1 turn. -Continue process and set down 3k at 8,496' md. -PU to 180k and bleed jars. -PU to 183k and pipe moving. 11:00 - 14:30 3.50 FISH P DECOMP Observe well -hole taking 6 bbls / hr when static. , -POH w/ Fish slowl f/ 8,463' to 319' and w/ 4" D.P. 14:30 - 16:00 1.50 FISH P DECOMP Rack back D.C's. Bring Fish to Rig floor. -Break Baker tools. RU Csg equipment. 16:00 - 17:00 1.00 FISH P DECOMP L/D 4 1/2", 17#, L-80 TDS Tbg. . - b L1D= 560' (14 full jts + 1 pup jt C~3 8.36'). -Total joints recovere rom we = 5 17:00 - 17:30 0.50 FISH P DECOMP Break down Baker tools, Shoe, Guide, Bowl, 3 Extensions. -Break Upper extension, Overshot & Pumpout Sub. 17:30 - 19:30 2.00 FISH P DECOMP Clear Rig floor of all Tools not needed. -Mobilize BHA to rig floor. -MU: Shoe Over shot, Sub, 2 jts Wash pipe, Drive sub. -MU: Lubricated Bumper sub, Oil jar, XO & (9) D.C's. 19:30 - 22:30 3.00 FISH P DECOMP RIH w/ 4" D.P. f/ 366' to 8,605' md. -PU D.P. 1 x 1 from pipeshed f/ 8,605' to 9,020' md. 22:30 - 00:00 1.50 FISH P DECOMP Obtain parameters: PUW 180k, SOW 156k, ROT wt 168k. -168 gpm / 300 psi, Tq 2-3k ~ 40 RPM. -Work down Taq TOF ~ 9032' md. -Continue to work down over Fish. -Fluid lost for day= 248 bbls. Printed: 4/21/2008 1:16:00 PM • • BP EXPLORATION Page 5 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date From - To .Hours Task Code NPT 3/31/2008 22:30 - 00:00 1.50 FISH P 4/1/2008 00:00 - 01:00 1.00 FISH P 01:00 - 04:00 3.00 FISH P 04:00 - 06:00 2.00 FISH P 06:00 - 07:30 1.50 FISH P 07:30 - 10:30 3.00 FISH P 10:30 - 12:00 1.50 FISH P 12:00 - 14:00 2.00 FISH P 14:00 - 15:00 1.00 FISH P 15:00 - 18:00 3.00 FISH P 18:00 - 19:30 1.50 FISH P 19:30 - 20:30 1.00 FISH P 20:30 - 21:00 0.50 FISH P 21:00 - 00:00 3.00 FISH P Spud Date: 9/20/1978 Start: 3/26/2008 End: Rig Release: 4/10/2008 Rig Number: Phase Description of Operations DECOMP -Total fluid lost to well= 531 bbls. DECOMP Contine to rotate and washover Fish to 9,056' md. -PUW 180k, SOW 156k, ROT wt 168k. 168 gpm / 300 psi. Free Tq 3k ~ 40 RPM. DECOMP POH w/ Fish f/ 9,056' to the BHA C~3 366' md. -No overpull noted. DECOMP Stand back D.C's. -UD Oil jars, Bumper sub & Drive sub, 1 jt of Wash pipe. -Pull Fish to Rig floor. -Lay down Fish: a -Recovered 2 pieces of Tbg. 1 pc= 12.73' & 1 pc= 2.28' . -Pieces were we ge esi a eac o er insi a was pipe. -Total Fish recovered this run = 15. 01' -NOTE: 4 dogs missing from cage in overshot. -C/O rolling Dog insert. DECOMP MU 8 1/2" x 6 5/8" Dra Tooth shoe, Rolling dog O.S. -MU 3 jts 8 1/8" washpipe, Bumper sub & Oil jar. -RIH w/ 3 Stds of D.C's. to 397' md. DECOMP RIH w/ 4" DP from 397' to 6,081' md. DECOMP Cut & slip 60' drilling line. -Service rig. DECOMP Continue RIH w/ 4" D.P. from 6,081 to 9,050' md. DECOMP Screw in TD -Obtain parameters. -PUW 180k, SOW 155k, ROW 167k w/ 40 rpm, 3k Tq. -Break circulation w/ 168 gpm / 280 psi. -Tag TOF at 9,057' and -Rotate down to 9,060' md. -Wash & slide down: -Work over coupling at 9;078' and O.S. depth w/ 5k weight, no rotary. -Continue to wash down. Taking weight at 9,088' and shoe _ depth. M~ ~ ~m -Attempt to rotate past slowly -Rotary stalling w/ 5k torque - No success. -PU w/ 5k over and bleed jars - PU w/ 10k over and weight fell off. DECOMP Observe well 6 bbls / hr losses. -Blow down Top Drive. POH f/ 9,088' to 397' md. DECOMP Stand back D.C's. UD Wash pipe -Fish dropped out of last jt of wash pipe while in the slips.. -Drain Stack- Fish part can be seen in bottom of Stack. Service break oe i -Recovered a 2.30' piece of 4 1/2" Tbg from top of Rolling dog cane' -Caae missinq two dogs. DECOMP Wait on magnet to Fish Fish out of Stack. -Lower magnet in hole on Tugger. -Retrieve 2' piece (1/2 of 1 side) of Fish from Stack. DECOMP MU Baker BHA: -8 1/2" x 6 5/8" Drag Tooth shoe, 8 1/8" T-Dawg Overshot, -3- jts of Wash pipe, Drive sub, Bumper sub, Oil jar, XO, -MU 3 Stds of 4 3/4" D.C's. to 396' md. DECOMP RIH w/ Fishing BHA on 4" D.P. from 396'to 6,742' md. Printed: 4/21/2008 1:16:00 PM • • BP EXPLORATION Page 6 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase i Description of Operations 4/1/2008 21:00 - 00:00 3.00 FISH P DECOMP -Fluid lost today= 241 bbis -Total fluid lost= 772 bbls 4/2/2008 00:00 - 01:00 1.00 FISH P DECOMP Continue to RIH w/ Fishing Assy on 4" D. P. from 6,472' to 9,048' md. 01:00 - 02:30 1.50 FISH P DECOMP Obtain parameters: -PUW 180k, SOW 156k, ROT wt 168k, Free Tq 3k ~ 40 RPM. -Wash down ~ 168 gpm / 330 psi, Tag Fish @ 9,055' md. -Rotate and wash over Fish to 9,108' md.- WOB 8k, Tq 8k. -Work up and down two times with the same result. 02:30 - 06:00 3.50 FISH P DECOMP Observe well 6 bbl / hr losses. -POH w/ Fish on 4" D.P. from 9,108' and to 850' md. 06:00 - 07:30 1.50 FISH P DECOMP Stand back DC's -LD B.S., jars, drive sub and 2 jts. 8 1/8" washpipe -Pull fish to clear rotary -Break shoe, "T" dog O.S. -LD fish and wash i e on skate -Recovered 2 pieces (1 w/ collar) 29.63' and 20.93' -Total = 07:30 - 09:00 I 1.501 FISH I P 09:00 - 12:30 3.50 FISH P 12:30 - 15:30 3.00 FISH P 15:30 - 19:30 4.001 FISH ~ P 19:30 - 20:30 I 1.001 FISH I P 20:30 - 22:00 I 1.501 FISH I P 22:00 - 00:00 I 2.001 FISH I P 4/3/2008 100:00 - 01:00 1.001 FISH ~ P -Total joints recovered from well = 226 + 1/2 of 227 DECOMP MU shoe, "T" dog, 3 jts 8 1/8" washpip?, B.S. and jars DECOMP RIH w/ 4" D. P. from 395' to 9,107' md. DECOMP Screw in TD -Obtain parameters -PUW 180k, SOW 155k, ROW 168k, w/ 40 rpm & 3k Tq. -Tag TOF at 9,110' and -Set down 5-6k w/ no movement -Rotate and mill down to 9,127 and -Set down 25k - No -PU to 185k (5k over) - PU to 190k -Allow jars to bleed. -Pull to 200k, work down to neutral - PU to 205k and repeat process. -Pull to 208-209k and pipe moving -Pull up to 9,107' and w/ 4-5k over. -NOTE: Safety meeting in Doghouse w/ Workover Supt & ADW safety Advisor (See Remarks). DECOMP Observe well _ 6 bbls / hr losses. -Blow down Top Drive. POH from 9,110' to 395' md. -Noted Overpull C~ 8,634' & 4,373' md. DECOMP Rack back D.C's. -UD XO, Oil jars, Bumper sub, drive sub, 2 jts of Wash pipe. -Total lenoth of 4 1/2" Tbp recovered this Trip is 6'. DECOMP -C/O Mill shoe.PU & MU BHA. -8 1/2" x 6 5/8" Mill shoe, 8 1/8" T-Dawg overshot, -3 jts of 8 1/8" Wash pipe,Drive sub, Bumper sub, Oil jar, -XO & 3 Stds of 4 3/4" D.C's. DECOMP RIH w/ Fishing BHA on 4" D. P. from 397'to 6,836' md. -Fluid lost today= 219 bbls -Total fluid lost= 991 bbls Continue to RIH w/ Fishing Assy on 4" D.P. f/ 6,836' to 9,110' md. 01:00 - 05:30 4.50 FISH P DECOMP Obtain parameters: -PUW 180k, SOW 156k, ROT wt 170k, Tq 3k ~ 50 RPM. -Pump rate 169 gpm / 330 psi. -Wash down Taa Fish ~ 9.121' md. Printed: 4/21/2008 1:16:00 PM • • BP EXPLORATION Page 7 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To ~ Hours Task II Code NPT Phase Description of Operations __ -- _ 4/3/2008 01:00 - 05:30 4.50 FISH P DECOMP -Wash & rotate over Fish to 9.127 md._ -Tq= 8k, W06= 20k. Pulled up to 195k. -Let jars bleed off. Weight fell off to up wt. -Work Fish several times, Stacking weight & stalling rotary. -Worked Mill shoe de th to 9,132' md., -Pull up to 190k, weight fell off to up wt. -No noticable over pull. 05:30 - 09:00 3.50 FISH P DECOMP Observe well - 6 bbl / hr losses. -POH with Fish f/ 9,132' to 395' md. 09:00 - 09:30 0.50 FISH P DECOMP Secure well. -Safety Stand Down w/ Ops Workover Supt and ADW Safety Advisor. -Topics included wellhead safety and New Score Card. 09:30 - 11:00 1.50 FISH P DECOMP Stand back D.C's. -LD jars, BS, 2 jts 8 1/8" washpipe. -Break off shoe and "T" dog O.S. -9 total pieces of tubing recovered: -1 piece 4` long w/pin end down, partial coupling. -Plus other pieces totaling 10' of recovery. -Total recovery = +/ -10' ' 11:00 - 12:00 1.00 FISH P DECOMP M shoe, "T" dog OS, BS, jars, 3 jts 8 1/8" washpipe. ' ' , s to 395 md. -~wT3 stands DC 12:00 - 13:30 1.50 FISH P DECOMP PJSM. 'I -Cut & slip 59.5' drilling line. -Service Top Drive, Blocks & Crown. 13:30 - 16:00 2.50 FISH P DECOMP RIH from 395' to 9,111' and with 4" D.P: 16:00 - 22:00 6.00 FISH P DECOMP Screw in TD -Obtain parameters: ', -PUW 180k, SOW 156k, ROW 168k, w/ 3k Tq at 40 rpm. -Tag TOF at 9,130' md. - & rotate down from 9,130' to 9,133' md. -Attempt to slide down with no success. -Continue rotating with pipe torque maxing out. Release torque. -Start over several times. Worked pipe down and freed up the torque. -Washed down free to 9,155' md. Ta ed u . -Started rotating 40-60 RPM. Continued to work pipe. -Pipe torqued up to 8k. Worked pipe down to 9,171' md. -Max Tq= 10k, max W06= 20k, slack off ~ 30k, -No overpull, 7k drag noted. 22:00 - 00:00 2.00 FISH P DECOMP Observe well - 6 bbls / hr losses. -POH,from 9,171' to 4,658' and with Fishing BHA on 4" D. P. -Fluid lost today= 242 bbls -Total fluid lost= 1233 bbls 4/4/2008 00:00 - 01:30 1.50 FISH P DECO on roue o w/ Fish from 4,658' to 395' md. 01:30 - 03:00 1.50 FISH P DECOMP Stand back D.C's. -L/D Jars, Bumper sub, drive sub, 2 jts of 8 1/8" Wash pipe. -Break off shoe & T-Dawg. Remove Fish from Wash pipe. -Total 4 1/2" Tbg recovered= 22' in several pieces. - awg ie missing. 03:00 - 03:30 0.50 FISH P DECOMP PU Baker Tools to Rig floor - 8 1/2" x 6 5/8" Mill shoe. 03:30 - 04:30 1.00 FISH P DECOMP MU shoe. C/O T-Daw ca e & 3 jts of 8 1/8" Wash pipe. -MU iars & 3 tds of 4 3/4" D.C's. Printed: 4/21/2008 1:16:00 PM ~ • BP EXPLORATION Page 8 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Cade ~ NPT ', Phase ' Description of Operations 4/4/2008 04:30 - 07:30 3.00 FISH P DECOMP RIH w/ Fishing Assy on 4" D.P. from 395' to 9142' md. 07:30 - 12:00 4.50 FISH P DECOMP Screw in TD -Obtain parameters: -PUW 180k, SOW 156k, ROW 168k, w/ 3k Tq at 40 rpm. -PU & rotate down from 9,169' to 9,174' md. -Rotary stalling at 8k. -PU to 10k over, allow jars to bleed off. -PU to 20k over and work bumper sub closed and repeat. -PU to 30k over, work BS - PU to 40k over and pipe pulled free. PU to 9,165' -Slack off and tag TOF at 9,169' md. Continue millin to 9,177' and -Lost torque. PU w/ no overpull observed. 12:00 - 16:00 4.00 FISH P DECOMP Observe well _ 6 bbls / hr losses. -POH to 9,110' md. LD single jt of D. P. -Pulled to 225k (45k over) at 9,070' md. -Screw in TD and pump ~ 330 gpm / 980 psi. -Work free. -Continue POH from 9,070' to 396' md. 16:00 - 18:30 2.50 FISH P DECOMP Rack back D.C's. -L/D XO, Oil jars, Bumper sub, Drive sub, -L/D Wash pipe, clean out T-Dawg overshot, -Recovered 5' of 4 1/2" Tb . -MU -Mill shoe to Wash pipe, MU T-Dawg, -MU Overshot. PU 2 jts Wash pipe from pipe shed. -PU & MU Drive sub, Pin X Pin sub, Boot basket, Bit sub. -PU & MU Bumper sub, Oil jars, XO & 3 Stds of 4 3/4" D.C's. 18:30 - 21:30 3.00 FISH P DECOMP RIH with Fishin Ass on 4" D. P. from 403'to 9,150' md. 21:30 - 00:00 2.50 FISH P DECOMP _ Obtain parameters: PUW 180k, SOW 156k, ROT wt 168k. -Free Tq 3k @ 40 RPM. Pump rate 168 gpm / 300 psi. -Tag stump C~ 9,177' md. Break circulation. -Work over stump to 9,180' md. -Fluid lost today= 215 bbls -Total fluid lost= 1448 bbls 4/5/2008 00:00 - 03:30 3.50 FISH P DECOMP Wash over Tbg stump from 9,180' to 9,230' and Mill shoe -Stalling C«~ 10 then 12k Tq, Work pipe & rotary. Wt will not Mill off. -Work pipe several times. Increase over pull in 5k increments. -PU 185k, SO to 157k. PU 190k, SO 157k. PU 195k, SO 157k. -PU 200k, SO 157k. PU 205k, SO 157k. PU 210k SO 157k. -PU 210k and weight broke down to 157k. -Reconfirm Tag and PU / SO wt. -No overpull noted, 2k down drag noted. -Stand 1 Std back. Observe well - 5 bb / hr lossses. -LD 1 single to 9,118' md. 03:30 - 07:00 3.50 FISH P DECOMP POH w/ Fishing Ass _ on 4" D.P. from 9,118' and to BHA at 404' md. 07:00 - 09:00 2.00 FISH P DECOMP Stand back 3 Stds of D.C's. -LD Bumper sub, Jars, Boot basket and 2 jts of washpipe. -Break shoe off of jt. #3. -Release fish f/ shoe. Printed: 4/21/2008 1:16:00 PM • • BP EXPLORATION Page 9 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date From - To Hours Task Code NPT 4/5/2008 07:00 - 09:00 2.00 FISH P 09:00 - 10:00 1.00 FISH P 10:00 - 14:30 4.50 FISH P 14:30 - 15:00 0.50 FISH P 15:00 - 16:00 1.00 FISH P 16:00 - 19:00 3.00 FISH P 19:00 - 00:00 5.00 FISH P 4/6/2008 00:00 - 00:30 0.50 FISH P 00:30 - 01:00 0.50 FISH P 01:00 - 04:00 3.00 FISH P 04:00 - 05:30 1.50 FISH P 05:30 - 06:30 1.00 FISH P Spud Date: 9/20/1978 Start: 3/26/2008 End: Rig Release: 4/10/2008 Rig Number: Phase Description of Operations DECOMP -Recovered: remainder of jt # 228 (12') & 19' of jt #229 (including coupling). -Total recovered this trip = +- 31'. -Total recovered from well 228 1/2 jts. DECOMP Clear rig floor of all equipment not needed. -Clean rig floor. DECOMP RU test a ui ment -Test BOPE: -Performed tests w/ 4" D.P -Annular 250 psi low / 3500 psi high - 3 1/2" x 6" top rams. -Choke manifold. HCR choke & Kill -Floor safety valves. -Test: Upper & Lower IBOP. 2 7/8" x 5" lower rams. -Perform Accumulator test. -Test Blind rams - 250 psi low / 3500 psi high. -Pull 4" test joint -Install 4 1/2" test joint -Test top & bottom rams. -Test to 250 low 3500 high all tests 5 minutes each - No failures. -All tests witnessed by WSL and Tool Pusher. -Lou Grimaldi with AOGCC waived witness of test . DECOMP RD test equipment and pull test plug. -Install wear ring. -Blow down lines. DECOMP MU: Shoe, 1 jt Wash pipe, Over shot, 2 jts Wash pipe, Drive sub, -Double pin sub, Boot basket, Bit sub, Bumper sub, oil jars, -XO & 3 Stds of 4 3/4" D.C's. DECOMP RIH w/ Fishing Ass on 4" D. P. from 402'to 9,210' md. -MU 1 Std in mouse Rhole. DECOMP Obtain parameters: PUW 181 k, SOW 157k, ROT wt 170k. -Free Tq 3k ~ 40 RPM. 168 gpm / 310 psi. -Ta TOF (~ 9,228' md. Mill over to several times. -MITI & Wash over to 9,270' md. Tq range 3-12k ~ 40 RPM. -Fluid lost today= 123 bbls -Total fluid lost= 1571 bbls DECOMP Mill & Wash over Fish from 9 270' to 9 274' md. -PUW 181 k, SOW 157k, ROT wt 170k. -168 gpm / 310 psi. DECOMP Work pipe attempt to unseat seals f/ PBR. -Work pipe several times. Increase over pull in 5k increments. -PU 185k, SO to 157k. PU 190k, SO 157k. PU 195k, SO 157k. -PU 195k jars bled off. -PU 195k, SO 157k. PU 197k, weight broke down to 185k. -Reconfirm Tag and PU / SO wt. DECOMP Stand back 1 Std. Blow down Top Drive. Install Air slips. / 4" D.P. from 9,200' to 402' md. DECOMP Stand back 3 Stds of 4 3/4" D.C's. -L/D & clean Boot basket. M/U same. -L/D Bumber sub, jars and Drive sub. -L/D 2 jts of Wash pipe into pipe shed. -Break shoe, Recover Fish (+- 16' stuck inside Washpipe #3). -Total recovery this trip = +-36' (1 couplin ) DECOMP L e`1 a~or~ can rig loor. Printed: 4/21/2008 1:16:00 PM • • BP EXPLORATION Page 10 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date From - To ' Hours Task 'Code NPT Spud Date: 9/20/1978 Start: 3/26/2008 End: Rig Release: 4/10/2008 Rig Number: Phase Description of Operations 4/6/2008 106:30 - 07:30 I 1.001 FISH I P 07:30 - 08:30 I 1.001 FISH I P 08:30 - 11:00 ~ 2.50 ~ FISH ~ P 11:00 - 11:30 I 0.501 FISH I P 11:30 - 14:30 I 3.001 FISH I P 14:30 - 18:00 3.501 FISH P 18:00 - 22:30 ~ 4.50 ~ FISH ~ P 22:30 - 00:00 I 1.501 FISH I P 4/7/2008 100:00 - 01:30 I 1.501 FISH I P 01:30 - 04:00 I 2.501 FISH P 04:00 - 09:00 I 5.001 FISH I P DECOMP PU Washover assembly: -MU: Mill Shoe, 3 jts Wash pipe, Drive sub, -Double pin sub, 7" Boot basket, Bit sub, Bumper sub, Oil jars, -XO & 3 Stds of 4 3/4" D.C's. -RIH w/ 4 3/4" DC's and 4 stands 4" DP to 771' md. -2nd run of Redress shoe. DECOMP Cut & slip 59.5' of drilling line. -Service TD, blocks & crown. DECOMP RIH from 771' to 9,207' md. -PU 2 singles from shed. PU Std # 94. DECOMP Screw in TD -Obtain parameters: -PUW 180k, SOW 157k, ROW 169k, w/ 3k Tq at 40 rpm. -Break circ. w/ 168 gpm / 290 psi. DECOMP Ta TOF at 9 267' md. -PU & rotate down from 9 267' to 9 280' md. -Weight fell off -Slide w/ no rotary to 9,290' md.Taking weight. -Rotate and wash over f/ 9,290' to 9,320'md. -Parameters: w/ 80 rpm, 3-10k WOB, 4-15k Tq. -Stalled out C«? 9,301 & 9,312' md. -At 9,320' and Torque fell off - No more progress. -PU w/ 10k over for 5-6' pulling free -Pulled 30k over (210k). -Set down w/ 20k weight - PU w/ pipe moving free to 9,295' md. -Pull 15k over, let jars bleed -pull freely w/ 20k over to 9,270' md. DECOMP Blow down Top Drive. Observe well - 3 bbl / hr losses. „~lfrom 9,320' to 399' md. -Dragging 20k-80k over 9,320 to 9,255' md. -Continue POH to BHA w/ no overpull. DECOMP Rack back 3 Stds of 4 3/4" D.C's. -LD: XO, Oil jars, Bumper sub, Bit sub. -Break out 7" Boot basket- clean. MU Boot basket. -LD Pin X pin sub, Drive sub & 3 jts of 8 1/8" Wash pipe. -LD Mill shoe. Recovered +- 20' of 4 1/2" Tb . -MU new Mill shoe, 3 jts Wash pipe, Drive sub, -Double pin sub, 7" Boot basket, Bit sub, Bumper sub, -Oil jars, XO & 3 Stds of 4 3/4" D.C's. DECOMP RIH w/ Fishing BHA on 4" D. P. From 403'to 5,042' md. -Fluid lost today= 210 bbls -Tot - 81 bbls DECOMP Continue to RIH w/ Fishing Assy on 4" D.P. -RIH from 5,042' to 9,306' md. DECOMP MU Top Drive. Obtain parameters: PUW 180k, SOW 157k, ROT wt 170k, Free Tq 3k ~ 40 RPM. -Pump rate 168 gpm / 290 psi. Tag Fish ~ 9,317' md. -Mill and Wash over to 9,337' md. Pump Hi Vis Sweep (70 YP). -Nothing of note in returns -Small scale (B-B size & pipe dope). DECOMP Millin and Washin over from 9,337' to 9,354' md. -PUW 180k, SOW 157k, ROT wt 170k, Free Tq 3k ~ 40 RPM. -Pump rate 168 gpm / 290 psi. -Milling Tq up to 14k. Printed: 4/21/2008 1:16:00 PM BP EXPLORATION Page 11 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date ~ From - To ~! Hours Task Code NPT Phase Description of Operations 4/7/2008 09:00 - 12:30 3.50 FISH P DECOMP Stand back 1 Std. Blow down Top Drive. Install Air slips. -Observe well - 3 bbls / hr losses. -POH w/ 4" D. P. from 9,307' to the BHA ~ 402' md. 12:30 - 15:30 3.00 FISH P DECOMP Stand back 3 Stds of 4 3/4" D.C's. -LD & clean Boot basket. -LD XO, Oil jars, Bumber sub, jars and Drive sub. -LD 3 jts of Wash pipe into pipe shed. -Break shoe, Recover Fish. -Recovered 25' total including 1 GLM. -Got call rom town to run Kill strip and end "Work-Over". --~ 15:30 - 17:30 2.00 FISH P DECOMP Clear Rig floor of all equipment & Baker Tools. -PU Clean out BHA & Scra er. MU Clean out BHA. ~~ -8 1/2" Bit, Boot basket, 9 5/8" Csg scraper, Bit sub, Oil jars, XO -MU (9) 4 3/4" D.C's. to 310' md. 17:30 - 20:00 2.50 CLEAN P DECOMP RIH w/ 4" D. P. from 301' to 9,300' md. 20:00 - 22:30 2.50 CLEAN P DECOMP PJSM on fluid transfers and pumping sweep. -Circulate Hi Vis Sweep (64YP) surface to surface. -Chase /circulate HV Sweep with clean 120 F Sea Water. -Pump rate 343 gpm / 1040 psi. PUW 180k, SOW 155k. -Circulate hole clean. 22:30 - 00:00 1.50 CLEAN P DECOMP w II - I hr lose : Pump Dry job. -LD 1 Jt of 4" D.P. Blow down Top Drive. -POH from 9,300' to 6,931' md. 4/8/2008 00:00 - 02:30 2.50 CLEAN P 02:30 - 03:00 0.50 CLEAN P 03:00 - 03:30 0.50 TA P 03:30 - 08:00 4.50 TA P 08:00 - 09:00 1.00 TA P 09:00 - 09:30 ~ 0.50 ~ TA ~ P 09:30 - 10:30 1.00 ~ TA ~ P -Fluid lost today= 130 bbls -Total fluid lost= 1911 bbls DECOMP Continue to POH w/ Clean out BHA & 9 5/8" Casing scaper. -POH from 6,931 to BHA ~ 300' md. DECOMP LD (9) 4 3/4" D.C's, Oil jars, 9 5/8 Casing scraper & 8 1/2" Bit. -Bit OD in gauge. SURE Clean & clear Rig floor. PU Haliburton "RBP". -MU RBP. SURE RIH slowly w/ RBP on 4" D.P. to 9,000' md. SURE Screw in TD -Obtain parameters: -PUW 165k -SOW 150k. -Break circulation 84 gpm / 200 psi. -S of RBP at 8,992' and and set per HES Re . -POH 15'. RU to test 9 5/8" casing. Circulate 1 ~D.P. volume. SURE Close top rams -Line to Pump down DP and Kill line -Att m to ressure u on 9 5/8" casin -Fluid um in awa~ -11 bbls um ed to achieve 2200 psi -Check surface equipment -Lost 1000 psi in 5 min. -Bleed pressure - RD test equip. SURE Enoauoe RBP and release per HES rep. -POH to 8,350' md. Screw in TD -Obtain parameters: -PUW 160k -SOW 142k -Break circulation. -Spot RBP at 8335' (Mid element = 8339') and set per HES ~'~ Printed: 4/21/2008 1:16:00 PM • • BP EXPLORATION Page 12 of 14 Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours ~! Task '~, Code' NPT Phase I Description of Operations 4/8/2008 09:30 - 10:30 1.00 TA P SURE Rep. -POH 15'. 10:30 - 11:00 0.50 TA P SURE RU to test 9 5/8" casing -Circulate DP volume 11:00 - 11:30 0.50 TA P SURE Close top rams -Line to Pump down DP and Kill line -Attem t to ressure u on 9 5/8" casin -Fluid um in awa -12 bbls um ed to achieve 2500 si -Check surface equipment -Lost 1500 psi in 5 min. -Lost additional 200 psi to 800 psi in 10 min -Bleed pressure - RD test equip. 11:30 - 12:00 0.50 TA P SURE Engage RBP and release per HES Rep. -P rom 8,343' to 8,168' md. 12:00 - 13:30 1.50 TA P SURE Continue to POH w/ 4" D. P. from 8,168' to 5,991' md. 13:30 - 15:00 1.50 TA P SURE Screw into Top Drive. Obtain parametres: -PUW 125k, SOW 122k, 118 gpm / 60 psi. -Top of RBP C~ 5,971' md. Btm of element @ 5,975' md. -RU test equipment. Circulate D. P. volume. -Test 9 5/8" casin to 2,500 psi for 5 minutes -Pass. -Chart test of 9 5/8" casin to 3,500 si or 30 minutes -Pass. -Bleed off pressure. Blow down Top drive, Cmt line Kill line. -RD test equipment. Release from RBP. ~>~ ~. 15:00 - 17:00 2.00 TA P SURE ; a` V ~- LD 4" D.P. from 5,971' to 3,560' md. 17:00 - 17:30 0.50 TA P SURE PU Storm packer, XO & 1 Std of 4" D. P. PUW 98k, SOW 98k. -Set top of Storm packer ~ 98' md. Set w/ 44k down wt on packer. 17:30 - 18:00 0.50 TA P SURE rm acker to 1,000 si f/ 10 minutes on chart.-Pass -Blow down Choke Kill lines 18:00 - 00:00 6.00 TA P SURE PJSM on ND BOP Stack. Blow down Hole fill line. -Pull Wear ring. Pull Riser. Suck out Stack. -Release Turn buckles. RD Choke hose & Flow line. Break seals. -Std back BOP Stack. Remove Tbg spool. BOLDS. -Change out Primary packoff. -NOTE: -6 of 12 Cap screw bolts on Primary seal are sheared off. -Bolts are broken at top where they go into the slips. -Fluid lost today= 166 bbls -Total fluid lost= 2,077 bbls 4/9/2008 00:00 - 00:30 0.50 TA P SURE Continue to install new Packoff. 00:30 - 03:00 2.50 TA P SURE Install Tbg spool. Set BOP stack on. Install Choke line. -Install Riser & Flow line. -Test Packoff to 3,500 psi for 30 minutes -Pass. -Witnessed by T.P. &WSL. 03:00 - 03:30 0.50 TA P SURE -Install test plug. RU test equipment. Fill BOP Stack. 03:30 - 04:00 0.50 TA P SURE Test Stacks tits: Tbg spool /BOP Stack flange & Choke line split. -250 low psi / 3,500 psi high pressure. -Chart tests for 5 minutes each -Pass. -Witnessed by WSL & T.P. ^'~ Y `~ l Printed: 4/21/2008 1:16:00 PM ~ ~ BP EXPLORATION Operations Summary Report Page 13 of 14 Legal Well Name: B-10 Common Well Name: B-10 Spud Date: 9/20/1978 Event Name: WORKOVER Start: 3/26/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date .From - To Hours Task 'Code NPT Phase ~', Description of Operations 4/9/2008 04:00 - 04:30 0.50 TA P SURE RD test equipment. Clean Rig floor. 04:30 - 05:00 0.50 WHSUR P SURE Blow down Choke & Kill lines. Install wear bushing. 05:00 - 05:30 0.50 TA P SURE -Clean & clear Rig floor. PU Storm packer retrieval tool. -MU TIW valve. -Retrieve storm acker and ull to ri floor. LD storm acker 05:30 - 08:00 2.50 TA P SURE POOH and LD 4" DP f/ 3,560' to surface 08:00 - 08:30 0.50 TA P SURE -LD RBP running tool -Clear rig floor 08:30 - 09:30 1.00 TA P SURE RIH remaining 4" DP f/ derrick to 2,940' 09:30 - 11:00 1.50 TA P SURE -Cut and slip drilling line (59.5') -Service top drive, blocks and crown 11:00 - 13:30 2.50 TA P SURE POOH and LD 4" DP f/ 2,940' to surface 13:30 - 14:00 0.50 WHSUR P SURE Pull wear bushing 14:00 - 15:30 1.50 TA P SURE RU to run 4-1/2" kill strip C/O elevators, RU tongs, mobilize tubing hanger to rig floor 15:30 - 22:00 6.50 TA P SURE RIH 149 jts 4-1/2" 12.6# L-80 IBT tubing w/ wireline entry guide, XN-nipple and X-nipple (kill string) 22:00 - 23:00 1.00 TA P SURE -Check parameters: PUW 112k /SOW 110k -PU and MU tubing hanger, XOs and 1 jt 4" DP -Land tubing hanger. RILDS -LD 1 jt 4" DP and XOs -D rod TWC -Wireline ent uide ~ 5 881'. XN-ni le ~ 5 869'. X-ni le ~ 1 958' 23:00 - 00:00 1.00 WHSUR P SURE -RU to test TWC -Test TWC f/ below to 1 500 psi x 10 min on chart. Test f/ above to 3 500 psi x 10 min on chart -Clear rig floor of equipment used to run tubing. 4/10/2008 00:00 - 00:30 0.50 WHSUR P SURE RD testing equipment f/ testing TWC 00:30 - 02:00 1.50 BOPSU P SURE -Clean drip pan. Suck out stack. -ND BOP. RD flow line, riser, fill and bleeder line. PU stack. LD spacer spool 02:00 - 04:00 2.00 WHSUR P SURE -Mobilize tree and adapter flange to cellar. -NU adapter flange and tree -Test adapter flange to 5,000 psi x 30 min per Cameron rep. 04:00 - 07:30 3.50 WHSUR P SURE -Fill tree w/diesel -Attempt to test tree to 5,000 psi. Swab valve not shutting all the way. Steam swab valve f/outside. Valve closed. Cont. attempting to test tree, observing 200 psi bleed offs in 5 min. Cycle master, wing and swab valves under pressure several times per Cameron rep. -Test tree to 5,000 psi x 10 min on chart w/ diesel after cycling valves. Good test. 07:30 - 08:00 0.50 WHSUR P SURE -RU DSM lubricator and test to 500 psi x 5 min. -Pull TWC. -RD lubricator 08:00 - 10:00 2.00 WHSUR P SURE -RU Little Red. Test lines to 3,000 psi -Pump 140 bbls diesel down IA for freeze protect. 2 bpm / 700 si 10:00 - 11:00 1.00 WHSUR P SURE Jump IA to tubing. Let diesel U-tube. 11:00 - 11:30 0.50 WHSUR P SURE -RU lubri I - -RD lubricator Printed: 4/21/2008 1:16:00 PM s • BP EXPLORATION Operations Summary Report Legal Well Name: B-10 Common Well Name: B-10 Event Name: WORKOVER Start: 3/26/2008 Contractor Name: DOYON DRILLING INC. Rig Release: 4/10/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task ~ Code NPT Phase 4/10/2008 11:30 - 12:00 0.50 WHSUR P SURE 12:00 - 14:00 2.00 WHSUR P SURE Page 14 of 14 ~ Spud Date: 9/20/1978 End: Description of Operations -Test BPV f/ below to 1,000 psi x 10 min on chart w/ Little Red -Suck back lines w/ Little Red. RD Little Red -Secure tree. Clean cellar -Release rig ~ 14:00 Printed: aizvzoos tas:uuPnn CO1~T5ER~A ATIO CO1~II II55Ip1~ David Reem • SARAH PALlN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Engineering Team Leader ~ ( ~ BP Exploration Alaska, Inc. b "1 PO Box 196612 ~~ 1 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B-10 Sundry Number: 308-128 ~ ~~~ ~ ~ zoos Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. h Chair DATED this ! ~ day of April, 2008 Encl. ~ii ~ ~~ STATE OF ALASKA ~~ "' ~! ~ O ~' I~ ALA OIL AND GAS CONSERVATION COM~ION APR 0 9 2 O { 0 ~ APPLICATION FOR SUNDRY APPROVAL ~`~ 20 AAC 25.280 ~~aska Oil & Gas Conc r~,,,.,,,:__~_ 1. Type of Request: ^ Abandon ®Suspend ~ ^ Operation Shutdown ^ Perforate ^ Time Exten>~IchOrage ^ After Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ` ®Development ^ Exploratory 178-054 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20321-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU B-10 - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028313 - 64.3' - Prudhoe Bay Field / Prudhoe Bay Pool ` 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured): 11100' 9405' 10604' 9049' Yes, Unknown Depth 9350' Ca in L n Siz MD TVD Burst.. Colla se Structural Conductor 110' 3 " x 2 11 110' Surface 2675' 13-3/8" 2675' 2675' 4930 2670 Intermediate 10011' 9-5/8" 10011' 8617' 6870 4760 Pr cti n Liner 1507' 7" 9493' - 11100' 8229' - 9405' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10310' - 10398' 8837' - 8901' 4-1/2", 12.6# L-80 9350' - 10344' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker'HB-Ret' packer; Packers and SSSV MD (ft): 9428'; 7" x 4-1/2" Baker'SAB' Perm packer 10336' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: SAS Commencin O erations: April 7, 2008 ^ Gas ^ Plugged ^ Abandoned 17. Verbal Approval: Date: 4/7/2008 ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: Tom Maunder 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact David Reem, 564-5743 Printed Name avid Rem Title Engineering Team Leader Prepared By NamelNumber. Signature Phone 564-5743 Date ~ ~ ~ Terrie Hubble, 564-4628 Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: Subsequent Form Required: / /~ A roved B ~ COMMISSIONER THE COMMISSION Date ` Form 10-403 Revise 6/2006 ~ ORIGINAL Submit In Duplicate • Hubble, Terrie L From: Reem, David C Sent: Monday, April 07, 2008 3:48 PM To: NSU, ADW Drlg Rig 14; Haberthur, Jerry E (ASRC) Cc: Schmoyer, AI; Wooster, Chris E (TSA); Maunder, Thomas E (DOA); Hubble, Terrie L Subject: B-10 Plan Forward to Suspend Operations Attachments: B-10.pdf Jerry, Steve Rossberg is pretty adamant about Suspending Operations on B-10. As such, plan on the following: 1) Run 8" bit and 9-5/8" scraper BHA w/bumper-sub. Scrape csg to ~9000'md. Circ sweep around. POH. 2) RIH with Halliburton model 3L RBP and set at ~8990'md. Release from RBP, fill hole and PT casing to 3500 psi for 30-min (charted). 3) POH and LDDP until 40,000# hanging weight. P/U storm packer and set one stand below wellhead. PT storm packer to 1000 psi for 10-min. Confirm OA pressure is ZERO psi thru 2" O/A valve. 4) ND BOPs, ND tbg spool. BOLDS. Change out primary pack-off on emergency slips. NU new McEvoy 2-Step with YB secondary pack-off. Energize YB secondary seal with plasic packing. Test pack-off to 3800 psi for 30-min. NU BOP and test breaks to 250 psi/3500 psi. Notify Well Tie-in Coordinator of tubing spool change (Tom Germaine/Earl Beverly). 5) Retrieve storm packer and continue POH and LDDP. 6) Prepare to pick-up 4.5", 12.6#/ft, L-80 IBT killstring. Rabbit tbg and jewelry before RIH. RIH with the following killstring: 4.5" W LEG 10' pup jt 4.5" 12.6#/ft, L-80 TC-II PxB 4.5" "XN" nipple (3.725" ID) 10' pup jt 4.5", 12.6#/ft, L-80 TC-II pin x IBTM box 160 joints of 4.5", 12.6#/ft, L-80 IBTM cond. "B" tubing -make-up to the mark 10' pup "X" nipple (3.813" ID) 10' pup ~50 joints of 4.5", 12.6#/ft, L-80 IBTM cond. "B" tubing -make up to the mark tubing hanger with 4.5" TC-II pin X 4.5" IBTM pin. 7) Land tbg hanger & RILDS. LD landing jt. PT tbg hanger pack-off to 5000 psi. 8) Dry rod in TWC. PT from below to 1500 psi for 10-min. PT from above to 3500 psi for 10-minutes. ND BOP. 9) NU adapter flange and tree. PT with diesel to 5000 psi. 10) RU lubricator & PT to 500 psi for 5-min. Pull TWC. RU hot oilers. FP wellbore with 140 bbls diesel. RU jumper and U-tube IA to tbg f/1-hour. 11) Install BPV and test from below to 1000 psi for 10-minutes. Secure tree and cellar. RDMO. Tom, this well had TxIA communication and an obstruction in the tubing at 8445'. As such, no Sundry was required. We cut the tbg above this obstruction and successfully retrieved tbg in one piece from the cut. The pipe condition worsened the deeper we got. We have since spent -8 days fishing the remaining tubing in pieces above the upper packer in the well. We have not recovered all of the tbg above the upper packer (we lack one GLM and -60' of tbg and/or pup jts). The tbg is in terrible condition and to fix the well right it is highly likely we'd either have to recover the entire 900' of straddle or P&A the wellbore in favor of a rig sidetrack. We are opting to suspend the well with the intent of returning to it later in 2008. / Attached is a current schematic. I will forward a proposed schematic once I get it drawn up. B-l0.pdf (41 KB) Call with questionslconcerns. Dave Reem TREE= 7-1/16" CNV WELLHEAD= MCEVOY ACTUATOR= OTIS KB. ELEV - - 64.29' - BF. ELEV = 37.24' KOP = 2800' Max Angle = 45 @ 11000' Datum MD = 10348' Datum TVDss= 8800' . ~ - ~ 0 SA OTES 13-3/8" CSG, 72#, L-80, ID = 12.347" 2675' Minimum ID = 3.25" @ 10283' MERLA TBG PATCH JET CUT (03/09/081 8421 (7" TBG STUB, 26#, L-80, .0383 bpf, ID = 6.276" TOP OF 7" LNR 9-5/8" CSG, 47#, L-80, ID = 8.681" I 9478' I 00 PERFORATION SUMMARY REF LOG: BHCS, 10/15/78 ANGLE AT TOP PERF: 43 @ 10354 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 10296 - 10320 S 2-7/8" 6 10310 - 10330 O 03/18/01 5" 4 10320 - 10330 O 5" 4 10354 - 10370 O 05/22/00 2-1/2" 4 10370 - 10398 O 05/02/96 4" 4 10416 - 10426 S 4" 4 10442 - 10450 S 4" 4 10465 - 10480 S 04/01 /96 14-1/2" LNR 12.6#, L-80, .0152 bpf, ID = 3.958" I PBTD -j 10604, 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11100' 2103' -j4-1/2" OTIS SSSV Landing NIP, ID = 3.8 O 2306' 9-5/8" DV PKR GAS LIFE MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3034 2968 6 OTIS DMY RM 0 07/18/06 4 6017 5484 40 OTIS DMY RM 0 07/18/06 3 8451 7382 35 OTIS DMY RM 0 07!18/06 2 9306 8012 43 OTIS DMY RM 0 1 9373 8053 43 OTIS DMY RM 0 07/18/06 9402' 4-1/2" PKR SWS NIP, ID = 3.813" 9406' 4-1/2" BKR PBR SEAL ASSY, ID = 4.0" 9428 9-5/8" x 4-1 /2" BKR HB-RET PKR, ID = 4.0" 10276' --~ 4-1/2" OTIS XA SLIDING SLV, ID = 3.813" 10283'-10289' MERLA TBG PATCH, ID = 3.25" 10291'-10335' 4-1/2" TDS, BLAST JOINT, ID = 3.959" 10306' 7" MARKERJOINT 10336' 7"x4-1/2" BAKER SAB PERM PKR W/ANCHOR, ID = 4.0" 10343' 4-1 /2" OTIS 'XN' NIP, ID = 3.725" 10344' -{-1/2" WLEG, ID = 3.958" 10347' ELMD-LOGGED 10409' FISH - 79' TBG-CONVEYED 5" PERF GUN 7" PERMANENT BRIDGE PLUG 7" PERMANENT BRIDGE PLUG DATE REV BY COMMENTS DATE REV BY COMMENTS 10/24/78 ORIGINALCOMPLETION 03/09/08 LWPJC JET CUT 07/11/90 HS/PAG RWO CORRECTION (11/16/06) 03/26/01 RN/TP CORRECTIONS 11/01/01 WB/TP SURF LOC CORRECTION 07/18/06 CJWPJC GLV C/O 10/20/06 HS/PAG PERF CORRECTION (10/18/06) PRUDHOE BAY UNff WELL: B-10 PERMIT No: 178-0540 AF1 No: 50-029-20321-00 SEC 31, T11 N, R14E BP Exploration (Alaska) TREE= 7-1/16" CNV WELLHEAD= MCEVOY ACTUATOR= OTIS KB. ELEV = 64.29' BF. ELEV = 37.24' KOP = 2800' Max Angle = 45 @ 11000' Datum MD = _ _... _ 10348' DatumTVDss= 8800' B-'R~ Proposed Suspe 13-3/8" CSG, 72#, L-80, D = 12.347" 4-1/2", 12.6#/ft, L-80 IBTM kill string with WLEG @ -8400`md 17" TBG STUB, 26#, L-80, .0383 bpf, D = 6.276" I (TOP OF 7" LNR CSG, 47#, L-80, D = 8.681" PERFORATION SUMMARY REF LOG: BHCS, 10/15/78 ANGLEAT TOP PERF: 43 @ 10354 Note: Refer to Roduction DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8 4 10296 - 10320 S 2-7/8" 6 10310 - 10330 O 03/18/01 5" 4 10320 - 10330 O 5" 4 10354 - 10370 O 05/22/00 2-1/2" 4 10370 - 10398 O 05/02/96 4" 4 10416 - 10426 S 4" 4 10442 - 10450 S 4" 4 10465 - 10480 S 04/01 /96 4-112" LNR 12.6#, L-80, .0152 bpf, D = 3.958" PBTD 7" LNR, 29#, L-80, .0371 bpf, D = 6.184" ior~ ~4-1/2° HES X NP, D = 3.813" ~ 9-5/8" DV PKR 4-1/2" HES XN N~, D = 3.725" 6 HES 9-5/8" RBP @ -l000'md Remaining tubing fish (-'80`) w/top @ --9350'md 9406' 4-t/2" BKR PBR SEAL ASSY, ID = 4.0" 9428' 9-5/8" x 4-1/2" BKR HB-RET PKR, ID = 4.0" DATE REV BY COMMENTS DATE REV BY COMMENTS 10/24178 ORI~i1NAl COMPLETION 07/11/90 HSIPAGi RWO CORRBCTKNd 11/16/08 03/26/01 RNITP CORRECTIONS 11/01/01 WB/TP SURF LOC CORRECTION 07/18/06 CJWPJC GLV GO 10/20/06 HSIPAG PERF CORRECTION (10/18/06) 4-1l2" OTIS XA SLDWG SLV, D = 3.813" ' MERLA TBG PATCH, ~ = 3 2~, imeuu~~u~,mm 4-1/2" TDS, BLAST JOWT, D = 3.959" 7" MARKER JOINT 7"x4-1/2" BAKER SAB PERM PKR 4-1/2" 0715 'XN' N~ ID = 3.725" 4-1/2" WLEG, D = 3.958" ELMD-LOGGED FAH - 79' TBG-CONVEYED 5" PERT GUN 7" PERMANENT BRDGE PLUG 7" PERMANENT BRDGE PLUG PRUDHOE BAY UNIT WELL: B-10 PERMIT No: 178-0540 API No: 50-029-20321-00 SEC 31, T11N, R14E ~+ 6cpioratfon (Alaska) B-10 Proposed Schematic for Suspended Ops Page 1 of 2 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Monday, April 07, 2008 4:21 PM To: 'Reem, David C' Subject: RE° ljoposed Schematic for Suspended Ops Dave, Thanks for the information. Your drawing is about what I figured. Rough fishing days. have apprised the Commissioners of your request. Commissioner Norman has given his oral approval of you plan. I look forward to the sundry. The well will be considered suspended. Call or message with any questions. Tom Maunder, PE AOGCC From: Reem, David C [mailto:ReemDC@BP.com] Sent: Monday, April 07, 2008 3:48 PM To: NSU, ADW Drlg Rig 14; Haberthur, Jerry E (ASRC) Cc: Schmoyer, Ah, Wooster, Chris E (TSA); Maunder, Thomas E {DOA); Hubble, Terrie L Subject: B-10 Plan Forward to Suspend Operations Jerry, Steve Rossberg is pretty adamant about Suspending Operations on B-10. As such, plan on the following: 1) Run 8" bit and 9-5/8" scraper BHA w/bumper-sub. Scrape csg to ~9000'md. Circ sweep around. POH. 2) RIH with Halliburton model 3L RBP and set at ~8990'md. Release from RBP, fill hole and PT casing to 3500 psi for 30-min (charted). 3) POH and LDDP until 40,000# hanging weight. P/U storm packer and set one stand below wellhead. PT storm packer to 1000 psi for 10-min. Confirm OA pressure is ZERO psi thru 2" O/A valve. 4) ND BOPs, ND tbg spool. BOLDS. Change out primary pack-off on emergency slips. NU new McEvoy 2- Stepwith YB secondary pack-off. Energize YB secondary seal with plasic packing. Test pack-off to 3800 psi for 30-min. NU BOP and test breaks to 250 psi/3500 psi. Notify Well Tie-in Coordinator of tubing spool change (Tom GermainelEarl Beverly). 5) Retrieve storm packer and continue POH and LDDP. 6) Prepare to pick-up 4.5", 12.6#/ft, L-80 IBT killstring. Rabbit tbg and jewelry before RIH. RIH with the following killstring: 4.5" WLEG 10' pup jt 4.5" 12.6#/ft, L-80 TC-II PxB 4.5" "XN" nipple (3.725" ID) 10' pup jt 4.5", 12.6#/ft, L-80 TC-II pin x IBTM box 160 joints of 4.5", 12.6#/ft, L-8016TM cond. "B" tubing -make-up to the mark 10' pup "X" nipple (3.813" iD) 10' pup 4/8/2008 B-10 Proposed Schematic for Suspended Ops Page 2 of 2 ~50 joints of 4.5", 12.6#/ft, L-80 IBTM cond. "B" tubing -make up to the mark tubing hanger with 4.5" TC-11 pin X 4.5" IBTM pin. 7) Land tbg hanger 8 RILDS. LD landing jt. PT tbg hanger pack-off to 5000 psi. 8) Dry rod in TWC. PT from below to 1500 psi for 10-min. PT ftom above to 3500 psi for 10-minutes. ND BOP. 9) NU adapter flange and tree. PT with diesel to 5000 psi. 10) RU lubricator & PT to 500 psi for 5-min. Pull TWC. RU hot oilers. FP wellbore with 140 bbls diesel. RU jumper and U-tube IA to tbg f/1-hour. 11) Install BPV and test from below to 1000 psi for 10-minutes. Secure tree and cellar. RDMO. Tom, this well had TxIA communication and an obstruction in the tubing at 8445'. As such, no Sundry was required. We cut the tbg above this obstruction and successfully retrieved tbg in one piece from the cut. The pipe condition worsened the deeper we got. We have since spent ~8 days fishing the remaining tubing in pieces above the upper packer in the well. We have not recovered all of the tbg above the upper packer (we lack one GLM and ^-60' of tbg and/or pup jts). The tbg is in terrible condition and to fix the well right it is highly likely we'd either have to recover the entire 900' of straddle or P&A the wellbore in favor of a rig sidetrack. We are opting to suspend the well with the intent of returning to it later in 2008. Attached is a current schematic. I will forward a proposed schematic once t get it drawn up. «B-10.pdf» Call with questions/concems. Dave Reem From: Reem, David C [mailto:ReemDC@BP.com] Sent: Monday, April 07, 2008 4:f8 PM To: Maunder, Thomas f (DOA) Subject: B-10 Proposed Schematic for Suspended Ops Tom, here is a schematic for our proposed Suspended Operations on well B-10 at Prudhoe. Sundry to follow.... «g-10 Proposed Suspension.pdf» Thanks. Dave Reem 4/8/2008 B-1O (PTD #1780540) Classified as Problem Well . All, Well B-10 (PTD #1780540) has been found to have sustained casing pressure on the IA. The TIO pressures were SSV/2070/0 psi on 03/09107. The plan forward for this well is as follows: 1. D: Blind AIL line and bleed WHPs; monitor BUR SCANNED MAR 2 7 2007 2. F: Pump tubing sandback for secure A wellbore schematic has been included for reference. «B-1 O. pdt» The well has been classified as a Problem well. Please call if you have any questions: Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 Content-Description: B-IO.pdf B-IO.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 3/16/2007 12:49 PM TREE = WELLHEAD= A CTUA TOR= KS. ELEV = SF. ELEV = KOP = 2800' "'====.=""=m.'"'''''' Max Angle = 45 @ 11000' 10348' 8800' 113-318" CSG, 72#. L-80, ID = 12.347" I Minimum ID = 3.25" @ 10283' MERlA TBG PATCH 17" TBG STUB, 26#, L-80, .0383 bpf, 10 = 6.276" I TOPOF 7" LNR I 9493' ÆRFORA TION SUMMARY REF LOG: BHCS, 10/15/78 ANGLE AT TOP ÆRF: 43 @ 10354 Note: Refer to Production DB for historical perf data INTERV AL Opn/Sqz DA TE 10296 - 10320 S 10310-10330 0 10320 - 10330 0 10354 - 10370 0 10370 - 10398 0 10416 -10426 S 10442 - 10450 8 10465 - 10480 8 6 5" 4 5" 4 2-1/2" 4 4" 4 4" 4 4" 4 9478' 19-5/8" CSG.47#. L-80, 10 = 8.681"H 10011' 03/18/01 OS/22/00 05/02/96 04/01/96 14-1/2" LNR 12.6#, L-80, .0152 bpf, ID= 3.958" H 10344' , PBTDI 111 DO' 10604' 17" LNR, 29#, L-80, .0371 bpI, ID = 6.184" I 8-10 . I I REV BY COMMENTS 2103' -14-1/2" OTIS SSSV Landing NIP, 10 = 3.813"1 -j 9-5/8" OV PKR I 8T MD TVD DATE 5 3034 2968 07/18/06 4 6017 5484 07/18/06 3 8451 7382 07/18/06 2 9306 8012 1 9373 8053 07/18/06 9402' 1-14-112" PKR SWS NIP. 10 = 3.813" I 9406' -14-1/2" BKR PBR8EAL ASSY. 10=4.0" I 9428' H 9-5/8" x 4-1/2" BKR HB-RET PKR, 10 = 4.0" I 10276' 10343' 10344' 10347' 10409' -1 FISH - 79' TBG-CONVEYED 5" ÆRF GUN -j ? H 7" ÆRIV1ANENT BRIDGE PLUG -17" ÆRrv'ANENT BRIDGE PLUG PRUDHOE BA Y UNIT WELL: 8-10 ÆRMIT No: 178-0540 API No: 50-029-20321-00 SEC31, T11N, R14E BP Exploration (Alaska) Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth W /-7'6- ö5LJ 01/26/2007 ,1AN;~ {~ zorn J D ell ob# Log escription ae o or B-26B 11285930 MCNL 06/26/06 1 1 B-10 11225985 RST 07/03/06 1 1 J-21 11217277 RST 08/28/06 1 1 J-06 11321006 RST 08/30/06 1 1 J-22A 11217478 RST 08/30/06 1 1 J-12 11243953 RST 08/29/06 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 SCANNED JAN 3 0 2007 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: NO. 4129 I Ll3Sd Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay D t CI . CD BL . Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 99503-2838 ATTN: Beth Received by: \Jl STATE OF ALASKA ~ ALASK/~ _,IL AND GAS CONSERVATION C~. .,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Operation Shutdown [] Stimulate [] Plugging [] Pull Tubing [] Alter Casing [] Repair Well [] Other 5. Type I~ well: Development [] Exploratory [] Stratigraphic [] Service 4. Location of well at surface 2070' SNL, 1611' WEL, Sec 31, T11N, R14E, UPM At top of productive interval 257' SNL, 712' EWL, Sec 05, T10N, R14E, UPM At effective depth 446' SNL, 667' EWL, Sec 05, T10N, R14E, UPM At total depth 842' SNL, 993' EWL, Sec 05, T10N, R14E, UPM [] Perforate Add Perfs 6. Datum Elevation (DF or KB) KBE = 64.29 feet 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-10 9. Permit Number / Approval No. 78-54 / 10. APl Number 50- 029-20321 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 11100 BKB 9382 10400 BKB 8898 Length 110' 2648' 9984' 1607' feet feet feet feet Size Plugs (measured) Junk (measured) 20"X30" 279 c.f. 13-3/8" 5964 c.f. 9-5/8" 1797 c.f. Fish - 79" TBG-Conveyed 5" Perf Gun @ 10409' Cemented MD 137' 2675' 10011' 7" 515 c.f. 9493' - 11100' TVD BKB 137' 2675' 8601' 8214'-9382' Perforation depth: measured true vertical Open Perfs 10295'-10330', 10354'-10398' Sqzed Perfs 10296'-10320', 10416'-10426', 10442'-10450', 10465'-10480' Open Perfs 8826'-8851', 8868'-8901' Tubing (size, grade, and measured depth) 4-1/2" tubing to 9406', 4-1/2" L-80 tubing from 9406" to 10344'. Packers and SSSV (type and measured depth) 9-5/8" BKR HB-RET PKR @ 9428', 7" BKR SAB PERM PKR @ 10336'; 4-1/2" OTIS SSSV Landing NIP @ 2103'. 13. Stimulation or cement squeeze summary See Attachment RECEIVED Intervals treated (measured) Treatment description including volumes used and final pressure Alaska 0tl & Gas Cons. Commission Anchoraqe 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. Signe ~ to I hereby c/9~tify/jthat t~;)~'~oreg~ng is true ~nd correct the best of my knowledge d/"~ o~~e ~'~f'~ .~./'~ Title Technical Assistant Prepared By Name/Number: Form10-404 Rev. 06/15/88 '~ 0RJClI\~IA! Date ~'/2~/ De Wayne $chnorr 564-5174 Submit In Duplicate~.~ B-10 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 02/02/2001 PERF(ADD-PERF): D&T W/2 7/8" DUMMY GUN 03/18/2001 PERF(ADD-PERF): ADD PERFORATIONS SUMMARY 02/02/01 D & T W/2 7/8 DUMMY GUN & T.E.L. TAG T.D. @ 10398' CORRECTED DEPTH. CONTACT DSO, WELL POP. 03/18/01 PERF 10310-10330 WITH 20 FT GUN PJ 6SPF. GUN#l: INTERVAL 10310-10330 FT.CCL-TOP OF GUN:3.8 FT. STOP CCL: 10306.2 FT TD TAGGED AT 10390 FT. SECOND GUN FAILED TO FIRE. ***TURNED WELL OVER TO PAD OP. WILL COME COMPLETE PERF IN A FEW DAYS*** - 3/22/01 TOWN HAS CANCELLED REMAINING PERFS UNTIL THERE IS MORE INJECTION SUPPORT Fluids Pumped BBLS. Description DIESEL - PRESSURE TEST LUBRICATOR I TOTAL ADD PERFS 03/18/2001 SUMMARY The following interval was perforated using 2-7/8" HSD Power Jets guns, 6 SPF, random orientation and 60° phasing. 10310' - 10330' MD MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation Commission' Julie Heusser, ;~?~ Commissioner Tom Maunder, ~ ~/~~ P. I. Supervisor c;\.~.~ \~-C)\ DATE: January 18, 2001 FROM: Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit B Pad Thursday, January 18, 2001' I traveled to BPXs B Pad and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report shows I witnessed the testing of 17 wells and 34 components with 2 failures. The Pilot on well B-18 tripped below the required set'point and the pilot on well B-21 was frozen. Both failures were repaired and-sucessfully retested before I departed location. The` new style pilot insulation box fabricated using pipeline insulation installed on most wells on this pad shoUld. be installed on. the remaining SVS pilots to eliminate the freeze up problems evident on this pad. I also inspected the well houses on this pad while witnessing SVS testing. All the well houses inspected were clean and the equipment appeared to be in good condition. Summary: I witnessed the SVS testing at BPXs PBU B Pad PBU B Pad, 17 wells 34 components 2 failures 5.8% failure rate 22 well house inspections Attachment: SVS PBU B Pad 1-18-01 JJ X Unclassified Confidential Confidential (Unclassified if doc. removed ) SVS PBU B Pad 1-18-01 JJ.doc · Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Alaska Oil and Gas Conservation Commission Safety Valve SYstem Test Report Submitted By: Jeff Jones Field/Unit/Pad: PBF /PBU /B Pad SeParatorpsi: LPS 174 Date: 1/18/01 HPS 658 Well Permit SePar Set L/P Test Test Test Date · Oil, WAG, G~J, Number Number PSI PSI ' T~p Code Code Code Passed CAS or CYCLE B.01 1700080 174 125 120 P-. P OIL B-02A ~ 19611'10 658/174 550/125 500/120 P P OIL B-03B 1870480 B-04 1700320 B-05A '1960990 B-06 1770740 174 125 120 P P OIL B-07 1780020 658 550 520 'P P OIL B-08 1780410 658/174 550/125 510/110 P .P OIL B-09 1780490 ... B-10 ~ 1780540 174 125 110 P P OIL B-Il 1780690 ' .' ! . B-12A 1970090 658 550 530 P P OIL B-13A 1990570 B, 14 1780930 · B-15 1790190 B-16 '1790250 ' - B-17 1'790280 B-18 1820020 658 550 0 3 · P 1/18/01 OIL B-19 1820030 174 125 . 120 P P !B-20 · 1821680 174 125 120 P P B-21 1821760 '658 550. 510 2 P 1/18/01 OIL B,22 1820890 · B,23A 1970590 658/174 550/125 550/120 P P B-24 1821400 B-25 1821510 174 125 115 P P B-26B 2000570 '174 125 '125 P P B-27A 1961010 658/174 550/125:520/125 P P B-28 1853030 - B-29 1860140 . B-30 1860310 B-31 1910460 B-32A. 1991180 B-33A 1931450 174i 125 115 P P OIL · B-34 1930370 . Well Permit Separ Set I~/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE · B-35 1931460 B-36 1960650658/174 550/125 540/120 P P OIL J-05B 2000180 · · · · Wells: 17 Components: 34 Failures: 2 Failure Rate: 5.8% Remarks: The 2 failures were corrected and passed a retest. I IIC~1~1 O~ '9 ~.lr'9 R'TTR Pl::tT T T:t PaR 1.1R.fll TI 'vie STATE OF ALASKA - ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing__ Alter casing __ Repair well Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2070' SNL, 1611' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 257' SNL, 712' EWL, SEC. 05, TION, R14E, UPM At effective depth 446' SNL, 667' EWL, SEC. 05, TION, R14E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R 14E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 64.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11-05-10-14) PBU 9. Permit number/approval number 78-54 / 10. APl number 50- 029-20321 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11100 feet BKB 9382 feet 10400 feet BKB 8898 feet Plugs (measured) Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20 x 30 279 c.f. Surface 2648 13 3/8 5964 c.f. Intermediate 9984 9 5/8 1797 c.f. Production -- Liner 1607 7 515 c.f. Perforation depth: measured 10296'- 10330', 10354'- 10406' true vertical subsea 8759'-8839' (two intervals) Tubing (size, grade, and measured depth) 7" L-80 stabbed into top of liner at 9493' Inflatable bridge plug @ 10400' MD BKB Measured depth True vertical depth BKB 137 137 2675 2675 10011 8601 9493-11100 8214-9382 Sqzd: 10416'- 10426', 10442'- 10450', 10465'-10480' Packers and SSSV (type and measured depth) 7" WD packer & TP aSsy. at 9430~ 4 1/2" SSSV & insert at 1999' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 798 ~/~ 3962 2340 Subsequent to operation 668 /" 1803 708 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run.~ I Daily Report of Well Operatiofs? I ,-~ Oil X Gas~ Suspended~ 17. I herebj/, certD, t that ~.h. e."'~ ~,//? ~,,//' ,,/"//¥ fore~'oi~g is true ~/~j~t to the best of my knowledge. Signed //// ( f_./f'/j~,///' //'i. /___-//"..,,'f.~.,~,,~.-t._, Title TechnicalAssistantlll Form 10-404 Re~/06/1,~/88 - v ~_ 1520 2090 2O9 226 Service SUBMIT IN DUPLICATE WELL B-10(11-05-10-14) Reperf 4/25/96 The following interval were reperforated using 2 1/8" guns, 6 SPF, random orientation and 60° phasing. 10370'-10388'MD 5/02/96 The following interval were reperforated using 2 1/8" guns,4 SPF, random orientation and 90° phasing. 10370'-10398'MD Stimulation Operation 5/15/96 A CTU HCL/Acid Treatment was performed using the following fluids: SUMMARY: -- Well was a dog after squeeze and reperfs. Shutin well to rig up, killed well with 80 bbls filtered sw to get ct in hole, rih tagged td at 10398 etd pu and circ kill well through trico w/130 bbls of fsw. Loaded coil with 34 bbls acid (7.5% Hcl), closed trico and pumped acid away while pumping down bs with fsw at 1:1 ratio @ 10390. At 2 bpm, inj was 1080 init and came dowon to 1030 psi. Displaced w/ fsw while pooh and fp ct w/ meoh. Put well on production. FLUIDS PUMPED BBLS. 345 Filtered seawater 34 7.5% HC1 Acid 4 Methanol 383 Total 7 / 14 / 9 6 A CTU HCL/Perf Wash was performed using the following fluids: SUMMARY: Well was shutin on arrival. MIRU CAMCO #4906 CTU, BJ EQUIP, HOLD SAFETY MEETING, PT LINES. FLUID PACK WELLBORE WITH 162 BBLS FSW. SPOT ACID ACROSS PERF AND LET SOAK FOR 9 MIN. CONTINUE PUMPING ALL ACID AWAY WHILE JETTING PERFS. POOH PUMPING MIN RATE FSW TO KEEP COIL DISPLACED WITH FSW.RDMO. POP. FLUIDS PUMPED BBLS. 314 Fsw 50 15% HCL 364 Total Bbls Pumped Received by:,,, Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 r AnChorage, AK ~518 FAX.~o/ (907) 563-7~02 ~! Date: Oil & Gas Cons. Comm~o~- ,,.'L~chora~e LARRY GRANT Attn. ALno~ ual + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 9 May 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PLS FINAL BL+RF ECC No. ~]-3~ A-10j ~A-~[7 A-26 7/'' 2'9' H-04 / 1 PLS FINAL BL+RF I CN FINAL BL+RF I PLS FINAL BL+RF 1 CN FINAL BL+RF Run # 1 1130.08 Run # 1 2413.02 Run # 1 2452.06 Run # 1 3385.03 Run # 1 4112.05 1 PFC/PERF FINAL BL+RF Run # 1 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 CN FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 1 CN FINAL BL+RF Run # ! 1 PLS FINAL BL+RF Run # 1 1 PLS FINAL BL+RF Run # 1 1 PLS FINAL BL+RF Cont/ 1 PFC/PERF FINAL BL+RF Run # i 1 GR/CCL FINAL BL+RF Run # i Alaska Oil & Gas Cons. Commission Anchor~ ........... ~-~ ...... ............. 4468.06 5609.04 5627.13 5665.11 6090.05 61C3.05 3224.05 6624.03 6667.00 6670.00 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 7 May 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL N-22 (37-17-11-13) ~,~ ~B-10 (11-05-10-14) z-04 .Z-02A z-02 DESCRIPTION PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF GR/CCL FINAL BL+RF PFC/PERF FINAL BL+RF ECC No. Run # 1 2384.03 Run # 1 4468.05 Run # 1 4912.06 Run # 1 6053.02 Run # 1 6225.02 Run ~ 1 6654.02 Run # 1 6654.03 Received by: Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 18 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION J-07 '7'7'~\~) ~ .~,0~,1 CN/GR FINAL BL+RF ~-1o (1~-o5-1o-14) I CN/~R ~INAL ~+R~ J-08(05-n-13~,0~ 1CN/~R FINAL B~+RF ECC No. Run ~ i 3964.05 Run ~ 1 · 4468.04 Run # 1 4751.06 Run $ 1 5806.04 Run ~ i 6356.05 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by:/~ ~f_/ Date: Please sign and ~etu~6 Petrotechnical Da%a Centem B~ F~'~',~rctlon (At-aska) Ill~ f~0L'.~t Benson Boulevs~ ,'~achorage, Alaska 99908 ~eeeived b;F LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 22 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, B-10 (11-05-10-14) Enclosed, please f~nd the data as described below: 1 LDWG TAPE+LIS i LDWG TAPE+LIS ECC No. Run # i 4468.04 Run $ I 5806.04 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: RECEIVED ////' (,/ ""-'" Anchorage°'~'ummissi°n · .-LARRY GRANT Attn. ALASKA OIL. + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 24 August 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, ' '--': ~"Enclosed, please find the data as described below: ~-:r"~':~t':'~c~'~'' -:'D-23 '(22-24-11-13) :,._:~.1 PFC/PE~ FIN~ BL+~ .-.;~ .... '~'f.'.~t'/'(-.~Please sign and return to: Attn. Rodne¥ D. Paulson :'- .... .~ .-. Atlas Wireline Services ~:~--"~:7:'--'---~i~'i.~:L'~.'~-~~.~'''::''''' 'i ..... ' . - .... 5600 B Stree ...... ' '" ' "-:" t"~ch°rage'~ to ~'99518- ............ ' ' r F ( ) __ -, . -- . $~p I · ......... '~:~"~ -~"~"'"' ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. - ANCHORAGE AK, 99501. USA Date: 3 December 1993 RE: Transmittal'of Data ECC #: 4468.02 Data: CN/GR Dear Sir/Madam, Reference: BP B-10 (11-05-10-14) PRUDHOE BAY 'NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: Sent by U.S. MAIL CN/GR LDWG TAPE+LIST Run # 1 Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: ~~ ~_~ ~ Date: This is to acknowledge.i~eceipt of the followin9 p~nts and negatives. COMPANY: STATE OF ALASKA 'ATTENTION: LARRY GRANT FIELD: PRUDHOE BAY WELL - LOG DESCRIPTION PRINTS NEGS. SEPIA , D-11 PLS %EAK DETECTIO~ 5" 1 ]0qOO-- 107000 1 F-05 CN/GR (c~ 5,~ ]o9oO--1 ~%~ 0 1 F-39 PFC/G%{~C~ING PATCH) ~,, 1 U~o-- 7~50© 1 G-04 PFC/G~ACKER SET REC~ ~,, 1 ;00~O- ;~0 1 J-10 PLS 5" %1 ~o-gq~O 1 0 1 ~K-13 GR/CCL ~~) 5'~ IO~50~ I~O 0 1 K-13 PLS ~, ~~ ~ ;~qO 1 0 1 Q-01 PLS 5" ~Q-q.~O 1 0 1 R-01 PLS 5" ~0~lfl~ 1 0 1 F-04 (PERF]PFC/CCL 5" ~ ~gq~t o~7 0 1 R-16 PLS 5" [%D00 - ~qg~ 1 0 1 X-21 PLS 5" fl0OO-q%~ 1 0 1 SIGNED DATE Please return one copy of signed transmittal to each of the fol'iowi~ Atlas Wireline Services BP Exploration (Alaska) Inc. Pouch 340013 Petrotechnical Data Center MB 3-3 Prudhoe Bay, AK 99734 900 E. Benson Blvd. Anchorage, AK 99519-6612 FT/RTNCARD1 This is to acknowie receipt of the following ~P~ints and negatives. COMPANY: STATE OF ALASKA ATTENTION: LARRY GRANT FIELD: PRUDHOE BAY WELL - LOG DESCRIPTION PRINTS NEGS. SEPIA · Z-22 A SBT/GRICCL 5" ~Zq00~ ;~bO 0 - 1 . . SIGNED DATE Please return one copy of signed transmittal to each of the following: Atlas Wireline Services Pouch 340013 Prudhoe Bay, AK 99734 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519 - 6612 REPORT OF SUNDRY WELL OPERATION 1. Operations performed: Operation shutdown Pull tubing .. Stimulate Plugging Perforate X Alter casing Repair well Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2070' SNL, 1611' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 257' SNL, 712' EWL, SEC. 05, TION, R14E, UPM At effective depth 446' SNL, 667' EWL, SEC. 05, TION, R14E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R14E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 5. Type of Well: Development Exploratory Stratigraphic Service 11100 feet Plugs (measured) BKB 9382 feet 10400 feet BKB 8898 feet Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20 x 30 279 c.f. Surface 2648 13 3/8 5964 c.f. I nterm ediate 9984 9 5/8 1797 c. f. Production -- Liner 1607 7 515 c.f. Perforation depth: measured 10296'- 10330', 10354'- 10406' true vertical subsea 8759'-8839' (two intervals) Tubing (size, grade, and measured depth) 7' L-80 stabbed into top of liner at 9493' 6. Datum elevation (DF or KB)~' I I KBE = 64.29 AMSL .et 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11-05.10-14) PBU 9. Permit number/approval number 78-54 / 10. APl number 50- 029-20321 11. Field/Pool Prudhoe Oil Pool Inflatable bridge plug @ 10400' MD BKB Measured depth True vertical depth BKB 137 137 2675 2675 10011 8601 9493-11100 8214-9382 Sqzd: 10416'- 10426', 10442'- 10450', 10465'-10480' Oil X Gas .. Suspended Service 17. I hereby certify that the fore, Icing is true and correct to the best of my knowledge. Signed ~",~ 0j~,O ()_~ ~ ~'xvJ Title Senior TechnicalAssistantl Form 10-404~ Rev 06/15/88 Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 14. 16. Status of well classification as: 930 3326 2571 0 241 1930 ~'""~8736 176 0 238 Date SUBMIT IN DI~LIG'ATE Intervals treated (measured) Treatment description including volumes used and final pressure ~ G ~ ~) ~O~ Re0resentative Daily Average Production or Injection Data J~[aSKa, uu '~,j~~.l~ Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure TdfS'i~ig Pressure Packers and SSSV (type and measured depth) 7" WD packer & TP assy. at 9430'; 4 1/2" SSSV & insert at 1999' 13. Stimulation or cement squeeze summary see attachment R~~I~~ 3/22/92 WELL B-10(11-05-10-14) NRWO/Reperf A NRWO was performed using the following fluids: 260 bbls PW to Load Well 173 bbls PW 5 bbls FW 24 bbls ACID 5 bbls FW 112 bbls PW 147 bbls PW(Cool Sump) 5 bbls FW(Preflush) 16 bbls Cement 17 bbls FW(Spacer) 40 bbls PW(Displacement) 212 bbls PW(Live Reverse Out) 80 bbls PW(Jet Pass) 43 bbls PW(Final Reverse Out) 47 bbls Recovered(Sweep Gas Displacement) 35 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 10521' 245 bbls load fluid behind pipe(Cumulative Approximate Total Load Fluid Behind Pipe is 245 bbls) 10.5 bbls Cement Recovered(Does Not Include Cement not pumped) ACID: 12% HCL W/20% XYLENE(12.1 FIELD TIT RATE), 2% WS-36, .4% HAI-85, .45% FERCHEK-A CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .4% CFR-3, .26% HR-12, .14 GAL/SK HALAD-344L 3/26/92 The following interval were reperforated using 2 7/8" guns, 4 SPF, 90° orientation and 180° phasing. 10370' - 10406' MD fjh 12/13/92 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/27/92 T# 83999 BP CASED HOLE PRODUCTION LOGS Enc'losed is your copy of the materials listed questions, please contact BP Well Records at A-33~-' f~ 9/15/92 #1 ~B-10 ~'~ PROD*F,.~'~- ~ 09/11/92 B-218Z-,g~ PROD.~--~(- ~ 09/12/92 B-22~ ~~%~f~/9/15/92 below. If you have any (907) 564-4004. 1000.00-11112.00 CAMCO 2 " 10200.00-10439.00 CAMCO 5 " 8828.00-10000.00 CAMCO 5 " 10800.00-11080.00 CAMCO 5 " 2050.00-10780.00 CAMCO 2/5" Information Control Well Records RECEIVED OCT 2 9 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 04/03/92 T# 83369 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 03/26/92 #1 03/27/92 #1 03/29/92 #1 10250.00-10480.00 SCH 5 " 9200.00- 9923.00 SCH 5 " 8750.00- 9190.00 SCH 5 " Information Control Well Records Adrian J. Martin R£C£1VED APR 5 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/20/92 T~ 83191 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ./.~ ~..111 PITS .,ioo LEAK DET P ROD-F GAS ENTRY LOG 5 It 12/31/91 01/02/92 01/04/92 01/01/92 01/01/92 01/07/92 01/01/92 8970.00- 9500.00 CAMCO 5 " 9300.00- 9850.00 CAMCO 5 " 9410.00- 9914.00 CAMCO 5 " 11700.00-12600.00 CAMCO 2/5" 8450.00- 9850.00 CAMCO 5 " 10580.00-10835.00 CAMCO 5 " 10200.00-10520.00 CAMCO 5 " 12/31/91 9700.00-10065.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED JAN 2 9 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION ~. Date :03/28/91 T#:82256 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-17 C-12 C-21 D-24 F-18 G-31 H-16 N-09 Q-02 Q-03 Q-06 Z-18 Z-32 Inj 03/17/91 #1 9900-10800 Carrx~ 5" Gas Entry 03/10/91 # 1 10200-10527 Camco 5" Prod-F 03/11/91 # 1 11500-11448 Camco 5" Temp 03/18/91 #1 8900-9163 Camco 5" Temp 03/18/91 #1 10700-10930 Camco 5" Leak Det. 02/19/91 #1 0-11438 Camco 5" PITS 03/08/91 # 1 8900-9200 Camco 5" Gas Entry 03/09/91 #1 1900-10037 Camco 5" Tie In CCL 03/19/91 #1 8100-9350 Camco 5" Prod-F 03/08/91 # 1 8850-9350 Camco 5" Pmd-F 03/07/91 #1 8850-9350 Camco 5" Prod-F 03/07/91 #1 11050-11350 Camco 5" CCL 03/15/91 #1 13081-13929 Camco 5" Leak Der. 03/16/91 #1 400-10250 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED APR 1 Alaska 011 & Gas Cons. Anchorage , STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Stimulate Plugging Perforate X 1. Operations performed: Operation shutdown Pull tubing X Alter casing 2. Name of Operator BP Exploration ~ 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surface 2070' SNL, 1611' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 257' SNL, 712' EWL, SEC. 05, TION, R14E, UPM At effective depth 446' SNL, 667' EWL, SEC. 05, TION, R14E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R14E, UPM 12. Present well condition summary Total depth: measured 11100' feet Plugs (measured) 9382' feet BKB true vertical Other X 6. Datum elevation (DF or KB) KBE = 64.29 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11-05-10-14) 9. Permit number/approval number 78-54 / 90-409 10. APl number 50- 029-20321 11. Field/Pool Prudhoe Bay Field~Oil Pool Effective depth: measured true vertical 10614' feet Junk (measured) 10535' Tubing conveyed perf gun 8898' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured Length Size Cemented Measured depth 110' 20"x 30" 279 cu fl 137' 2648' 13-3/8" 5964 cu ft 2675' 9984' 9-5/8" 1797 cu ft 10011' 1607' 7" 515 cu fl 9493'-11100' True vertical depth BKB 137' 2675' 8601' 8214'-9382' 10320-10330',10296'-10330', 10354'-10406' (open intervals) 10296-10320', 10416'- 10426', 10442'- 10450', 10465'- 10480' (squeezed intervals) true vertical 8759'-8839' (two open intervals) Tubing (size. grade, and measured depth) 4-1/2" L-80 TDS @ 10423' R E ~ E i V ElD PaCkers and SSSV (type and measured depth) ~5/8" BakerHB Ret~c~erat ~t29; 4-1~"SSSVat 21~' , D~d In 13. Stimulmion or cement squeeze summaw ~as~ 011 & Gas Cons. C0~ Intewals tremed (measure) 10296-10330', 1~54-10406', 10416-10426', 10442-10~0', 10465-10480' 14. Treatment description including volumes used and final pressure squeezed with 155 cu ft class "G" cement to 3000 PSI Tubing Pressure Reoresentative Daily Averacm Production or Iniection Data - OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 967 881 203 Prior to well operation (4 hours) 1590 8416 6420 Subsequent to operation (24 hours) 2160 1734 453 Date/~~D SUBMIT IN DUPLICATE 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations . X Oil x Gas Suspended Service 17. I here,by certify th,~t~the foregoing is tr~je 'and' correct to the best of my knowledge. Sic, lned ~ "~ ,~~J,~'~' Title Completion Engineering Supervisor Form 1 ~)-404 Re~ 06/15/88~/ ~missio Attachment I WELL B-10 WORKOVER · Accepted rig at 1800 hours on 6/26/90. Cut 7" tubing at 9380'. Pulled 7" tubing. Pulled 7" tubing. Milled 7" WD packer and pushed to bottom. Tested 9-5/8" casing and 7" liner lap to 3000 psi. Pickled drill pipe with 13 bbls HCL and reversed out. Acidized perfs with 24 bbls HCL and cement squeezed with 135 sx Class G to 3000 psi. Cleaned out cement from 10275'- 10614'. Test squeezed to 1500 psi. Perforated 10320' - 10330'. Ran 4-1/2" straddle completion with tubing-conveyed perf guns. Set packer and tested tubing to 3000 psi. Tested annulus to 2500 psi. Released rig at 2100 hours on 7/10/90. 14.1 Days RECEIVED DEC 10 1990 Alaska 0il & Gas Cons. Comm'tss'to~ Anchorage BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Monday, June 25, 1990 WELL: B-10 (11-05-10-14) Day: -1 Expense AFE Number: 145008 Expense AFE Amount = Current Field Cost = Estimated Final Cost = PRUDHOE BAY UNIT RIG: NABORS , , , , , , , #1-ES , ,, ,,,, , Current Operation' Move rig from M-pad. Summary of Last 24 Hours: Move rig from M-pad. RE( EIVED DEC 1 0 1990 Alaska Oil & Gas Cons. Corniness'ton Anchorage Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Tuesday, June 26, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS #1-ES Day: 0 Expense AFE Number: Expense AFE Amount = 145008 Current Field Cost = Estimated Final Cost = Current Operation: Move rig from M-pad. Summary of Last 24 Hours: Move rig from M-pad. Reviewed By: ~('~ BP EXPLORATION DAILY WORKOVER REPORT: PRUDHOE As of 0600 Hrs. Wednesday, June 27, 1990 WELL: B-10 (11-05-10-14) BAY UNIT RIG: NABORS Day: 1 Expense AFE .Number: Expense AFE Amount = 145OO8 Current Field Cost = Estimated Final Cost = #1-ES Current Operation' Circulating well to seawater. Summary of Last 24 Hours: Accept rig at 1800 hrs on 6/26/90. Circulate and kill well. Reviewed By' ~/b~ BP EXPLORATION DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, June 28, 1990 WELL: B-10 (11-05-10-14) RIG: NABORS #1-ES Day: 2 Expense AFE Number: Expense AFE Amount = 145OO8 Current Field Cost = Estimated Final Cost = Current Operation: Pull and lay down 7" tubing. Summary of Last 24 Hours: Circulate and kill well. ND tree, NU BOP's and test. RU WL and cut 7" tubing at 9380'. Pull 7" tubing. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Friday, June 29, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS #1-ES Day: 3 Expense AFE Number: Expense AFE Amount = 145OO8 Current Field Cost = Estimated Final Cost = Current Operation: Pump LCM pill. Summary of Last 24 Hours: Pull and lay dOwn 7" tubing. RIH and spear fish at 9392'. Unable to jar seal assembly free. Reviewed By: ~p~ ~ BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Monday, July 2, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS #1-ES Day: 6 Expense AFE Number: Expense AFE Amount = 145OO8 Current Field Cost = Estimated Final Cost = Current Operation' POH with 41' 7" tubing. Summary of Last 72 Hours: Pump LCM pill. Mill 7" WD packer and push to bottom. Cut 7" tubing at 9481', 20' above PBR. RIH and spear 7" tubing stub, POH, 1 joint collapsed and parted. RIH and latch onto fish. POH with 41' of 7" tubing. Reviewed By: 'D"~ ¢' BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Tuesday, July 3, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS Day: 7 Expense AFE Number: Expense AFE Amount = 145008 CUrrent Field Cost = Estimated Final Cost = #1-ES Current Operation: RIH to recover WD packer. Summary of Last 24 Hours: RIH to recover seal assembly, unable to pull free. POH. RIH with 8-1/2" tapered mill and dress off top of seal assembly. POH. RIH with spear to recover WD packer at 10535'. Reviewed By:,~:~~ BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Friday, July 6, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS #1-ES Day: 11 Expense AFE Number: Expense AFE Amount = 145008 Current Field Cost -- Estimated Final Cost = Current Operation' Summary of Last 72 Hours: RIH w/8.5" tapered mill. Push WD packer to 10,690'. POH. RIH w/7" test packer to 9,296'. PU & set storm packer. ND BOP's & tubing spool. Change 9-5/8" packoff. NU new tubing spool and test. NU BOP's and test. Puli storm packer and set 7" test packer. Test 9-5/8" casing and 7" liner lap to 3000 psi. POH. RIH to 10,676'. Pickle drill pipe w/13 bbls HCL and reverse out. Acidize perfs, w/24 bbls HCL and cement squeeze w/135 sx Class G to 3000 psi. POH. RIH to cleanout, unable to get thru 7" stub without rotating. POH. Reviewed BY: ~~0~ BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Monday, July 9, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS #1-ES Day: 1 4 Expense AFE Number: Expense AFE Amount = 145008 Current Field Cost = Estimated Final Cost = Current Operation' Lay down drill pipe. Summary of Last 72 Hours: RIH and polish 7" tubing stub. POH. RIH and clean out firm cement from 10275'- 10614'. Test squeeze to 1500 psi (ok). POH. Make 9-5/8" and 7" casing scraper runs. Reverse circulate to filtered inhibited seawater. RU WL and run 8.5" gauge dng / junk basket to 9484'. Perforate 10320'- 10330'. Run 5.95" gauge ring / junk, basket to 10490'. RIH to LD drill pipe. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Tuesday, July 10, 1990 WELL: B-10 (11-05-10-14) PRUDHOE BAY UNIT RIG: NABORS #1-ES Day: 15 Expense AFE Number: Expense AFE Amount = 145OO8 Current Field Cost = Estimated Final Cost = Current Operation: Log perf guns into position. Summary of Last 24 Hours: RU and run 4-1/2" completion with tubing-conveyed perf guns. Reviewed By' ~.~. BP EXPLORATION DAILY WORKOVER REPORT: PRUDHOE As of 0600 Hm. Wednesday, July 11, 1990 WELL: B-10 (11-05-10-14) BAY UNIT RIG: NABORS #1-ES Day: 16 Expense AFE Number: Expense AFE Amount = 1450O8 Currant Field Cost = Estimated Final Cost = Current Operation: Rig released at 2100 hrs on 7/10/90. Summary of Last 24 Hours: Set packers and test tubing to 3000 psi. Shear PBR, space out and land tubing. ND BOP's, NU tree and test. Test annulus to 2500 psi, freeze protect well with diesel. Release rig at 2100 hours on 7/10/90. Reviewed By: "~'~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 07/13/90 T#:81355 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-~45. 'A-03 PERF 07/07/90 #1 11500-11910 SCH 5" A-03 CCL 07/08/90 #1 9190-11872 SCH 5" B-10 GR 07/10/90 #1 10000-10362 ATLAS 5" B-1 0 COLLAR 07/08/90 #1 10200-10460 ATLAS 5" M-12 PERF 07104/90 #1 9760-10167 SCH 5" M-21 CNL 07/01/90 .... #1 8190-9375 ATLAS 5" M-21 CCL 07~02~90 #1 8197-9354 ATLAS 5" , W-36 PERF 07~08~90 #1 9400-9695 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RE E JUL Alaska 0it & Gas Cons. Anchorage TO: THRU: MEMORA,.DUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lorfflie C. Smit~z~ DATE: July 11, 1990 Commissioner FILE NO: JT. BF. 711.6 TELEPHONE NO: SUBJECT: RIG/BOPE Inspection BPX PBU B-10 Prudhoe Oil Pool FROM: Petroleum Insp~efor Wednesday July 4, 1990: I made a walk thru inspection of Nabors 1ES B0~E".' '~he OnlY<::no~2C°mpliance I found were threaded connections in the kill line. I spoke with Gene Sweat, Nabors rep., and he informed me that another shock hoSe'had been shipped and would be installed as soon as it arrived. 02-001A (Rev. 6/89) 20/11fMEMOLPM3 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 07/06/90 T#:81328 FROM: sUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. B-10" TUBING CUTTER 06/27/90 #1 9060-9415 SCH 5" E-26/ CNL/GR 06/29/90 #1 9050-9721 SCH 5" H-16. PACKER RECORD 06/30/90 #1 9800-10155 SCH 5" J-20- TUB/PKR POSIT REC 06/27/90 #1 10732-12025 SCH 5" J-20- PERF 06/26/90 #1 10710-12120 SCH 5" M-06 ,,' PROD-L 06/30/90 #1 11000-11703 SCH 5" M-19-' CCL 07/03/90 #1 9463-10479 ATLAS 5" W-06- PFC 07/04/90 · #'i 12850-13290 ATLAS 5" X-15 - PROD-L 06/26/90 #1 9400-10041 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECKED J (J L 1 0 1990 Alaska Oil & Gas Cons. L;ommJssJ0n Anchorage STATE OF ALASKA -~-",-~ n 13 I _ . .ASKA OIL AND GAS CONSERVATION COk -~SION U IR I APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend ~ Alter casing ~ Repair well Change approved program ~ 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2070' SNL, 1611' WEL, SEC. 31, TI IN, R14E, UPM At top of productive interval 257' SNL, 712' EWL, SEC. 05, TION, R14E, UPM At effective depth 446' SNL, 667' EWL, SEC. 05, TION, R14E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R14E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Operation Shutdown Plugging ~ Pull tubing X Variance~ 5. Type of Well: Development Exploratory Stratigraphic Re-anter suspended well Time extension __ Stimulate Perforate X Other X Cement Squeeze 6. Datum elevation (DF or KB) KBE ,. 64,29 feet 7, Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11-05-1o-14) 9. Permit number 78-54 10. APl number 5O- 029-20321 11. Field/Pool Prudhoe Bay Field~Oil Pool 11100' feet Plugs (measured) Inflatable Bridge Plug @ 10400' MD BKB 9382' feet BKB 10400' feet Junk (measured) 8898' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth BKB 137' 137' 2675' 2675' 10011' 8601' 110' 20"x30" 279 cu ft 2648' 13-3/8" 5964 cuft 9984' 9-5/8" 1797 cu ft 1607' 7" 515 cu ft 9493;11100' measured 10296; 10330', 10354; 10406' (open intervals) 10416;10426', 10442; 10450', 10465; 10480' (squeezed intervals) true vertical 8759;8839' (two open intervals) 8214'-9382' Tubing (size, grade, and measured depth) 7"L-80 stabbed into top of liner@ 9493' ;::'~$/~a Oj/ & Gas Cons, Packers and SSSV (type and measured depth) 7" WDpacker& TP assy at 9430'; 4-1/2" SSSV insert at 1999' Anchora~ 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation June 1, 1990 16. If proposal was Verbally approved Oil x Gas __ Name of approver Date approved Service 17. I hereby certify that the fore[jging~is true and~correct to the best of my knowledge. Sic, lned f~~ Title CornpletionEn~ineerin~ISupervisor ' /~ ' FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity__ BOP Test__ Location clearance__ Mechanical Integrity Test ~ Subsequent form required 10- 15. Status of well classification as: Suspended __ J,',pprov,,, No?o Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY LONNIE C. SMITH Commissioner SUBMIT IN TRIPLICATE Approved CoDy . 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. ATTACHMENT I WELL B-10 WORKOVER PROCEDURE OUTLINE: Pull SSSV and Insert. Kill well (Reservoir Pressure is 3700 psi @ 8800' TVDss). Punch circulation holes in the 7" tubing. Circulate well to seawater. Freeze protect well to 1000' with diesel. Set BPV. MIRU workover rig. Pull BPV, circulate diesel from well, and install 2-way check valve. ND tree, NU and test BOP's to 5000 psi. Pull 7" tubing with WD Packer/tailpipe assembly inside. RIH with bit. PU 9-5/8" storm packer, set and release. ND BOP's, ND tubing spool and replace 9-5/8" packoff. NU replacement tubing spool and PT to 5000 psi. NU BOP's and test to 5000 psi. Recover storm packer. Cleanout to 11057' PBTD. RU wireline and set an EZ Drill bridge plug at ~10500'. Pickle the drill pipe with 10 bbls 15% HCl. Acid wash the perforations with 22 bbls BJ One Shot Acid (5 gal/fi), overflush with 75 bbls 2.0% Surfactant water. Cement Squeeze all existing perforations with ~ 100 sacks Class G. Clean out to EZ Drill. Pressure test squeeze to 2500 psi and clean out to PBTD. RU E-line and perforate 10320-10330', 5" guns, 4 spf, 90 deg. phased. Make 9-5/8".and 7" casing scraper runs, reverse circulate hole clean and change over to filtered inhibited brine. Make 8.5" and 5.95" gauge ring/junk basket runs. RIH with 4-1/2" completion string with straddle packer assembly and tubing conveyed perforating guns. Log into place. Set plug in tailpipe. Set and test packers, test backside. Shear PBR, space out completion. Sting into PBR and land tubing, test backside to 2500 psi. Install 2-way check valve. ND BOP's, NU tree and test to 5000 psi. Shear valve in top GLM and displace 140 bbls diesel down the annulus and U-tube to the tubing. Set BPV. Pump down cellar, release rig. After rig release, drop detonating bar to fire perf guns, 10354-10406'. BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP ATTACHMENT II TRIPLE RAM STACK WORKO VER RISER ..i I "'l ANNULAR PREVENTER i 2" KILL LINE MANUAL HYDRAULIC GATE GATE i i , I I PI PE RAMS i i I I PI PE RAMS I "i DRILLING SPOOL I I BLIND RAMS I I RE¢ IVE Cons. Commj Anchora~a 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 12, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton ' 'Well B-10 (11-05-10-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustainment work on the well. B. J. Policky / . . Supervisor Waterflood/Miscible Flood BJP:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File RECEIVED APR 1 ) 1990 t){i.a Gas Cone, Comolls~oiI ~ 'Anchorage STATE OF ALASKA ~'~ AI;ASKA OIL AND GAS CONSERVATION COMb, iON ~ APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: Abandon Suspend Alter oaslng Repair well Change approved program 2. Name of OperatOr BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 . 4. Location of well at surface 2070' SNL, 1611' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 257' SNL, 712' EWL, SEC. 05, TION, R14E, UPM At effective depth 446'SNL, 667' EWL, SEC. 05, TION, RI4E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R14E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB operation Shutdown Plugging Time extension __ Pull tubing Varlanoe Perforate 5. Type of Well: 6. Development X Exploratory Stratigraphlc 7. Service Re-enter suspended well . Slimulate" Other X Datum elevation (DF or KB) KBE- 64.29 AMSL feet Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11-05-10-14) PBU 9. Permit number 78-54 10. APl number 50- 029-20321 11. Field/Pool Prudhoe 0il Pool 11100 feet 9382 feet Plugs (measured) Inflatable bridge plug (~ 10400' MD BKB 10400 feet Junk (measured) 8898 feet Casing Length Structural -- Conductor 110 Surface 2648 Intermediate 9984 Production -- Liner 1607 Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20 x 30 279 c.f. 137 137 13 3/8 5964 c.f. 2675 2675 9 5/8 1797 c.f. 10011 8601 7 515 c.f. 9493-11100 8214.9382 10296'. 10330', 10354'. 10406' Sqzd: 10416'-10426', 10442'-10450', 10465'-10480' true vertical subsea 8759'-8839' (two intervals) Tubing (size, grade, and measured depth) 7" L-80 stabbed into top of liner at 9493' Packers and sssV (type and measured depth) 7" WD packer & TP assy. at 9430'; 4 1/2" SSSV & insert at 1999' 13. Attachments Description summary of proposal × Detailed operations program BOP sketch 14. Estimated date for commencing operation April 1990 16. If proposal was verbally approved Name of approver 17. I hereby 15. Status of well classificatE EE E I V j; P Oil X Gas Suspende~_ ~ APR 1 ] jo Date approved Service ~rrect to the best of my knowledge. ~ ~ ~ ' Title ' Waterflood/Miscible Flood FOR COMMISSION USE ONLY Conditions of Notify Commission so representative may witness Plug integrity BOP Test Location clearance ~ Mechanical Integrity Test. Subsequent form required lO- ORIGINAL SIGNED BY Approved by order of the Commission I CINNIF C, ~M!TH Form 10-403 Rev 06/15/88 Date Approval No. Date SUBMIT IN TRIPLICATE Well B.IO CTU Cement Squeeze Proposal A coiled tubing cement squeeze of existing perforation is proposed as follows: 1. Perform pre-workover surveillance. 2. Rig up CTU and support equipment and pressure test BOP's to 4000 psi. 3. Perform perforation acid wash and sump cleanout. 4. Pump cement and squeeze existing perforations. 5. Reverse out cement after squeeze is obtained. Wait overnight, then test squeeze by performing inflow test. If squeeze fails, immediately resqueeze 6. if squeeze is successful, perforate the following intervals: 10354'-10406' MD BKB All depths are referenced to BHCS 10/15/78 7. Return well to production and test. 8. If well will not return to production and/or sustain production, a perforation acid wash may be performed. REEEIVED ~R 13 ]9,90 ~ J)il & Gas Cons. Comm~lon Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2" Chicksan (Kill Line) Slips ~-~ Pipe Rams Pump-In Sub (C irc ula te/R e turns ) W ell Head Swab Valve RECEIVED APR 1319so ~il & ~as Co,'~ Com~. BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 December 28, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton "Well'B, lO (11-05-10-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, J. . ragg Manager Production Engineering JAB:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File ,'"~ STATE OF ALASKA . REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation shutdOWn Pull tubing 2. Name of OPerator BP Exploration (Alaska) Inc. 3' AddreSs P. O. Box 196612, Anchorage, Alaska 99519-6612 ~. Lo~tion of Well at surface 2070'$NL, 1611' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 257'$NL, 712'EWL, SEC. 05, TION, R14E, UPM At effective depth 446' SNL, 667' EWL, SEC. 05, TION, R14E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R14E, UPM 12. present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Stimulate X Alter casing 11100 feet BKB 9382feet 10400feet BKB 8898feet Plugging Repair well 5. Type of Well: Development X Exploratory , Stratigraphlo Service Perforate ..... Other 6. Datum elevation (DF or KB) KBE , 64.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11.05.10.14) PBU 9. Permit number/approval number 78-54 / 9-391 10. APl number 50- 029-20321 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Inflatable bddge plug @ 10400' MD BKB Junk (measured) Casing Length Size Structural -- Conductor 110 20 x 30 Surface 2648 13 3/8 Intermediate 9984 9 5/8 Production -- Liner 1607 7 Perforation depth: measured 10296'- 10330', I0354'- 10406' Cemented Measured depth True vertical depth BKB 279 c.f. 137 137 5964 c.f. 2675 2675 1797c. f. 10011 8601 515 c.f. 9493-11100 8214-9382 Sqzd: 10416'-10426', 10442'-10450', 10465'-10480' true vertical subsea 8759'-8839' (two intervals) Tubing (size, grade, and measured depth) 7" L-80 stabbed into top of liner at 9493' Packers and SSSV (type and measured depth) 7" WD packer & TP assy. at 9430'; 4 1/2" SSSV & insert at 1999' 13. StimulationOrcementsqueezesUmmary see attachrnent .;.~. i'i~ ~.~ 14, InterVals treated (measured) Treatment description including volumes used and final pressure Re.°resentative Daily Average ProdUctiOn or Iqjection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to Well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well.Operations X 17, I here "~b~~__~b". ~ is true Signed p~E:~~~ Form 10-404 Rev 06/15/88 1010 2804 2811 2740 2189 230 16. Status of well classification as: Oil X Gas Suspended Service and correct to t~,best of my knowledge. y/- Title Manager Production Engineerinj~ 1047 658 SUBMIT IN DOP,.L~CATE WELL B-10 (11-05-10.14] PBU STIMULATION OPERATIONS The following work was performed on the perforated intervals listed. 10310' - 10330' MD BKB 10365' - 10395' MD BKB 5/20/89 A half-strength mud acid treatment was attempted with a TAM inflatable straddle packer. The packer would not set properly. The following fluids were pumped: 12 bbls. 15% HCI w/mutual solvent 24 bbls.. 6% HCI - 1.5% HF 45 bbls.. 2% NH4C1 brine w/mutual solvent 5 bbls. 2% NH4C1 brine w/mutual solvent as spacer The well was put back on production and tested. 5/21/89 Performed a 29-bbl. HC1 perf wash and nitrogen lift. 5/29/89 Performed jet pump lift. 5/30/89 Performed nitrogen lift. 6/25/89 Performed diesel/xylene solvent wash. 6/27/89 Performed jet pump lift. 10/15/89 Set inflatable bridge plug at 10400' MD BKB for water shut-off. Dumped cement on top of plug. 10/17/89 Performed nitrogen lift. jm 12/19/89 BP EXPLORATION May 15, 1989 I/V L BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well B-10 (11-05-10-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, Manager Production Engineering JkB: JA~4 Enclosures ( ) cc: L. Burke (MB12-1) Well File RECEIVEF MAY I ? ]~ Alaska Oil & u:~s O~, ..... Cu,n,,~as,ai Ancho['age 1:Type of Request: STATE OF ALASKA A~SKA OIL AND GAS CONSERVATION COMMISt=,ON APPLICATION FOR SUNDRY APPROVALS 2. Name of Operator BP Exploration (Alaska) Inc. Abandon Suspend Operation Shutdown Alter casing ~ Repair well Plugging Time extension Change approved program Pull tubing ~ Variance ~ Perforate 5. Type of Well: 6. Development X Exploratory ~ Stratigraphic ~ Service 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2070' SNL, 1611' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 257' SNL, 712' EWL, SEC. 05, TION, R14E, UPM At effective depth 498'$NL, 829' EWL, SEC. 05, TION, RI4E, UPM At total depth 842' SNL, 993' EWL, SEC. 05, TION, R14E, UPM 2. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Re-enter .uspended well Stimulate X Other Datum elevation (DF or KB) KBE, 64.29 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-lO (11-05-10-14) PBU 9. Permit number 78-54 10. APl number 50- 029-20321 11. Field/Pool Prudhoe Oil Pool 11100 feet Plugs (measured) BKB 9382 feet 10560 feet Junk (measured) BKB 8999 feet fill at 10560' WLM (05/88) Casing Length Size Cemented Structural -- Conductor 110 20 x 30 279 c.f. Surface 2648 13 3/8 5964 c.f. Intermediate 9984 9 5/8 1797 c.f. Production -- Liner 1607 7 515 c.f. Perforation depth: measured 10296'- 10330', 10354'- 10406' true vertical subsea 8759'-8839' (two intervals) TUbing (size, grade, and measured depth) 7" L-80 stabbed into top of liner at 9493' Measured depth True vertical depth BKB 137 137 2675 2675 10011 8601 9493-11100 8214-9382 Sqzd: 10416'.10426', 10442'-10450', 10465'-I0480' RECEIVED MAY 1 7 198cj packers and SSSv (type and measured depth) nopacker; 4 1/2" SSSV& insert at 1999' 13. Attachments ' Description summary of proposal x Detailed operations program AlaSka Oil & Gas Cons. C0m,,'aissi~i~ Ancho~a~le BOP sketch x 14. Estimated date for commencing operation 15. Status of well classification as: May/June 1989 16. If propOsal was verbally approved Oil X Ges~ Suspended Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I .// ~"L,/ FOR COMMISSION USE ONLY I Con(~J~ns of approval: Notify Comm,ssion so representative may witness I Approval No. ... 3 Plug integrity ~ BOP Test Location clearance Approved CUpy- I MeChanical Integrity Test SUbsequent form required ~~0-/J' Returned I .~'-~ ~o ~c~ I SIGNED Approved by order of the Commission :t~Y LONNIE C. SMITH Commissioner / Date .~'--~/,~"- ~"~ I Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL B.10 (11.0~;.10.14] PBU STI~VIULATION pROPOSAL A half-strength mud acid treatment is proposed for the following perforated intervals. 10310' - 10330' MD BKB 10365' - 10395' MD BKB A TAM inflatable straddle packer run on coiled tubing will be utilized to selectively stimulate the perforations in ten-foot stages with each stage being treated with the following. 12 bbls. 15% HC1 w/mutual solvent 24 bbls.. 6% HCI - 1.5% I-IF 36 bbls.. 2% NH4CI brine w/mutual solvent 5 bbls. 2% NH4CI brine w/mutual solvent as spacer The packer Will be retrieved following the treatment, and the well will be put back on production and tested. jm 5/12/89 Coflcd Tubing /Blow-Out-Preventers Coiled Tubing .o " Pack-O i"~  Blind Rams ,~ .... l' .~ C~tt~erRams · "~~2" Ch~ksan (KIlt Line) ]' ~ St[ps ' ) ( .. .Pump-In SuD (Clrcu~ t~R e turns) ~ ett Head Swab Valve HOUSTON ARCO CHEVRON EXZXON TEXACO TO: MOBIL REFERENCE: PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS INOEXED STANDARD ALASKA PRODUCTION Date: TI: 11-14-88 79546 The following material Is being submitted herewith. Please acknowledge receipt by slgning a copy of this letter and returning it to this office: W-22 11-09-88 CBT #1 8853-9696 Sch 5" W-22 11-09-88 CET #1 8853-9690 Sch 5" W-22 11-09-88 Perf #1 0.0-0.0 Sch 5" B-10 11-08-88 Prod #1 10200-10530 Sch 5" G-08 11-09-88 Prod #1 11900-12381 Sch 5" I NFORHAT I ON CONTROL ( / ~ 0il & Gas Cons. C0mmism'T~ Date ~ / "i~} ~nnhnrnn= Wel I Records LR2-1 V Founded m SOHIO ALASKA PETROLEUM COMPANY ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TE,'OkCO (-Marathon) MOBIL PHILLIPS BPAE 3111 "C" STREET ANC~()tlA(;E. ALASKA TELEPHONE 1907} 265.0000 MAIL: POUCH 6-G 12 ANCHORAGE. ALASKA 99502 Da te: T#: 11-05-85 76542 REFERENCE' SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- B-10 B-10 B-10 B-10 S-14 S-14 9-20-85 b/~Temp Survey 10000-10750 #1 Sch 9-20-85 ~H.P. Gradient 10000-10750 ~1 Sch ~9-21-85 ~ X~Set Otis WD Packer 9170-9500 #1 Sch \ \,WIT.P. ASS. 9-27-85 ~ ~Temp-Gradio-GR-CCL 9100-10560 #2 Sch 9-17-85 ~ ~ EPL 10260-10810 #3 Sch 9-15-85 EPL 10242-10814 #2 Sch 5~! 5" 5" 5" a£C[Iv[O Alaska Oil & Gas Cons. Contt~JssJon Anchorage Cathy Perkins LR 2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS BPAE 31 I 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE 19071 265-0000 MAIL: POUCH 6.612 ANCHORAGE, ALASKA 99502 Date: 10/31/85 T#: 76532 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a Copy of this letter and returning it to this office:-- SFO~,UNIT/STATE: ~.._'vE-2 Temp. Flu~id ID Spinner Cont. Flow Survey Temp. . · 10/01/85 #1 10250-10540 Camco 10/05/85 #1 11000-11430 Camco 10/05/85 #1 11000-11430 Camco 10/05/85 #1 11000-11430 Camco 10/03/85 #1 9900-10180 GO 5" 10/03-04/85 #1 9000-10110 Camco 5f! 5" 5" 5" 5" R£C£~v£O Ale,sim Oil & G~ Gone. Oomm~ And~rage 19 Technical DocumentatiOn Records Management LAO~I SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 October 30, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage; Alaska 99501 Attention' Gentlemen' Mr; C; V; Chatterton Well B-10 (11-05-10-14) PBU Enclosed in duplicate is Form ~{ells' for the above named well' RSA/~'~dg/1 Enclosure 026N CC: S. R. Bundy T. N. Tyler Wel 1 Records Drilling Well File #17 P. E. Well File #17 10-403, Sundry Notices and Reports on Very truly yours, SOHIO ALASKA PETROLEUM COMPANY R, S. Allan Division Drilling Engineer RECEIVED Alaska Oil & Gas Cons. "i%mm/ss'or~ ' ~nChor~go STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~ OTHER [] 2. Name of Operator 7. Permit No. SOHI~O ALASKA PETROLEUM COMPANY 78-54 . 3. Address 8. APl Number P, O. BOX 19..6612, ANCHORAGE, ALASKA 995.19-6612 50-029-20321 4. Location of Well 9. Unit or Lease Name At Surf~c.e: Prudhoe Bay Unit 10. Well Number 2070.': SNL, 16,11" WEL, Sec,. 31, TllN, R14E, UPM B-10 (11-05-10-14) PBU 11. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool KBF. = 64,29t' A_MSL ADL28321 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other ~} Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The follo~±ng' work was: performed on Well B?10, using a Coiled Tubing Unit (CTU). 1, Cement squeezed existing perforated intervals to shut off water channel. 2,. Reperforated the following, intervals at 4 s,p..f,: 1Q296~-10330:' MD 10354 '-104Q6" MD Intervals 10416':-10426t 10,442"-10450' and 10465'-10480' MD were left squeezed. 3. Put well back on production, The above work was completed on October 13, 1985. FCF VED t tlhe ............. lj~. reby certify that the foregoing is true and correct to the best of my knowledge. ~S'in~~'~ ~. ~. ~~-~ Title District Drilling Engineer T~e space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Submit "Intentions" in Triplicate ...... ~ . ,, ,_ ,..... _,~ .... SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 September 10, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C V. Chatterton Well B-10 (11-05-10-14) PBU Gen tl emen: Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named well. This contains our proposal to workover the well. Yours very truly, R. S. Allan District Drilling Engineer RSA:SRB:JLH:kkm 091 085: 0661N Enclosure cc: T. N. Tyler, MB9-2 Wel 1 Records (LR2-1) P. E. Well File #17 Drilling Well File #17 RECEIVED Alaska ~,,, ,, ~*~:~s Cons. Commission STATE OF ALASKA '""'"" ALASKA OI`L AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS Y_ 1. DRILLING WELL [] COMPLETED WELL'LI 7. Permit No. 2. Name of Operator SOHIO Alaska Petroleum Company 78-54 3m Address 8. APl Number P, O' Box 6612, Anchorage, Alaska 99502 5o_029-20321 9. Unit or Lease Name Prudhoe Bay Unit OTHER [] 4. Location of Well At Surface: 2070' SILL, 1611' ~EL, Sec' 31, Tll~' R14E, UP~ 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64,29' AMSL 12. I 6 . Lease Designation and Serial No. ADL 28321 10. Well Number B-lO (11-05-10-14)PBU 11. Field and Pool Prudh0e Bay Prudhoe 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other ~:] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed to squeeze the existing perforations in Well B-10 using a coiled tubing unit (CTU). After the squeeze, the well will be cleaned out and re-perforated, leaving the lowest perforated interval (10465' -- 10480' MD) abandoned. The work is outlined as follows: 1. Lay in mud from PBTD to 10500' MD. 2. Pump in cement and squeeze off perforations. e Contaminate cement in wel 1 bore. Reverse out contaminated cement after 12 hours. ® ~ Fo~ No. ~._~D~,e~ ~-~ 6. Re-perforate the following intervals at 4 s.p.f. -- .. -- C. E IV E D 10416' -- 10426' MD 10442' -- 10450' MD SEP! !~ Put well back on production and test.Alaska This work is scheduled to commence September 16, 1985. .. ,s. C0m~ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed - v The space below for Commission use Conditions of Approval, if any: HAL Approved by Title District Drilling Engineer Date C'///0/o~ .~' By Order of COMMISSIONER the Commission nisslon Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY SYO A~CO CHEVRON EXXON TO SFO/UNIT/STATE: TE]LACO (-Marathon) MOBIL PHILLIPS ~- STATE OF AK ! BPAE 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907i 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 12/12/84 Date: CC#: 75926 CENTRAL FILES(CC#'s-Transmittal Only) REFERENCE: · S~ CASED HOLE FTNAL LOGS /The following material is being submitted herewith, acknowledge receipt by signing a Please (./ copy of this letter and returning it tq this office:-- iA-4 /B-7 /,B-10 /C-8 /E-2 ..H-7 ./F-5 CH-CN% 11/7/84 #11 10300-10993 Sch 5" CH-CNL: 11/9/84 ~9 10800-12053 Sch 5" CH-CNL 11/11/84 #2 10000-10748 Sch 5" CH-CNL 11/6/84 #13 9450-10211 Sch 5" CH-CNL 11/8/84 ~.~/~ 9150-9955 Sch 5" CH-CNL 11/10/84 #13 9900-10950 Sch 5" Cont. Flow Survey 10/21/84 #1 11000-11320 GO 5" Cont. Flow Survey 10/27/84 #1 10100-10550 GO 5" Cont. Flow Survey 10/26/84 #1 10600-10900 GO 5" RECEIVED OAT( .... 19 Victoria Aldridge TPI-1 Development Geology SOHIO ALASKA PETROLEUM COMPANY SFO ARCO EXXON ?O: PHILLIPS ATE OF AK ,) CENTRAL FILES(CC#'s-Transmittal Only :3111 "C" TELEPHONE (907, 265 0000 MAIL POUCH 6 612 ANCHORAGE, ALASKA 99502 Date: 11-27-84 CC#: 75896 REFERENCE SgI~IO MAGNETIC LIS TAPES & LISTINGS : T e~following materialisbeingsubmittedherewith. Pleaseacknowledgereceiptbysigninga /"'copyofthisletterandreturningittothisoffice:-- Tape Pos~ / '*A-4~/ CH CNL '*B-7-' CH CNL '*B-8 / CH CNL *B-10X CH CNA I *C-i~~ CH CNL '*E-2~ CH CNL '*H-7- CH CNL w/ Listing w/ Listing w/ Listing w/ Listing w/ Listing w/ Listing w/ Listing 11-7-84 #11 Sch~69776 03228 11-9-84 #9 Sch#69775 03234 11'13-84 #11 Sch#69771 03230 11-11-84 #2 Sch#69772 03229 11-12-84 #3 Sch#69773 03232 11-8-84 #6 Sch#69777 03231 11-10-84 #13 Sch#69774 03233 (4/82) *SFO & EXXON: An Asterisk.(*) next to a listing above means you should have received the Tape(s) and Listing(s) dir.e.c_t, ly..from the respective service company. , ease RECEIVED olyn Bishop ..... ~--~'/'-~~'~'~'~-~. ~pment Geology DATE ..... ~ '_~_.i ,~ ..... t~'' Well Records f SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY TO: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES(CC#'s-Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6.612 ANCHORAGE, ALASKA 99502 Date: 8/19/83 CC#: 74666 REFERENCE S.~ CASED HOLE FINAL LOGS he material is being submitted herewith. Please acknowledge receipt by signing a following copy of this letter and returning it to this office:-- SFO/UNIT/STATE: X-14 CEL 6/18/83 #3 11151-12202 Sch 5" B-i0 DFT 7/30/83 #1 10100-10761 Camco 5" 'F-18' DFT 8/2/83 #1 11950-12450 Camco 5" N-10 DFT 8/4/83 #1 10250-10580 Camco 5" Y-6 DFT 7/31/83 #1 9900-11577 Camco 5" '(4/82) ' ' ,_,,?,: z...: ,.:.~:/..-~-~. ~ . DATE ........ ,' 19 ' ~'' :: : , :.,-~ ' Well Records' Logs Indu>:ed .. B-5 , . B-13 C-11 F-4 F-11 H-il Q-2 SOH I 0 COIiF I DENT I AL SOHIO ALASKA· PETROLEUM COMPANY · ARCO C~vrc~ . TO: SFO/UNIT/STATE: . . 31 1 1 "C" SIREET ANCHORAGE, ALASKA TELEPitONE {907) 2650000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date:'7/13/81 # 914 ' REFERENCE:  SOHIO FINAL DATA CASED HOLE The following material is being"kubmitted herewith. Please acknowledge rece~p! by signing a copy of this letter and returning it to this office:-- CNL (Sch) 5/9/81 tt3 EPL eCL/perf. 11 (Sch) 5/6/81 #1 5" (Sch) 5/12/81 #2 5" CNL (Sch) 5/16/81 #1 5" CNL (Sch) 5/2/81 /77 5" Spinner (Go) 6/13/81 #1 5" CCL/Perf/Tie In (Go) 6/14/81 #1 5" CNL (Sch) 5/15/81 #3 5" CNL --(Sch) 5/14/81 #3 5" OAT[ ..................... A!Tska 0i~ '~ !.;:.,-_',./~¥_!I1~: ~-; ......... 1'9" _._ Ap,,ch01 a:qu Carol Kriet:er Development Geology Well. Records SOHIO PETROLEUM COMPANY Di¥ision of Sohio Natural Resources Company ~_;,~:~ .... GEO"L/ SOHIO--BP ALASKA PRODUCTION DIVISION TO: ~'~'I-'%t-Z~T~S..TR~E._~.~. STAT'r~c L ANCHOR~G~~ ~' ~TAT T~C MAIL: POUCH ~: ..... ! ANCHORAGE, ALASKA 99502 2/12/80 #016 SFO/UNIT/STATE Mobil Phillips , , BPAE O/UNIT/STATE '.arathon REFERENCE: SOHIO DATA .Thee following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- , B-2 Pressure Survey & Data Form B-8 " - ,, ,, 1/12/80 1/12/80 1/10/80 12/28/79 12/31/79 1/13/80 Carol "K~ieter Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: State of Alaska 'Alaska Oil'&GGas 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Mr. H. Hamilton 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 November 8, 1979 REFERENCE: Well Data transmission ~wing material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- _ '~-2 Corrected cover sheet -3A Transient Pressure Survey/Raw data 10/17/79 1 sepia and i print for the following wells: dL9 DDNLL '~un"i .......... C-10 DDNLL Run 1 ~ FDC Run 1 2" BHCS Run 1 2" CNL/FDC Run 1 2" DIL Run 1 2" I Carol K'rieter Well Records DATE 19 . SOHIO PETROLEUM COMPANY _J .... / 1"-'" .... ;'-'~,' "'/ 3~ 1 "c" STREET .. TELEPHONE (907) 265-0000 /--~ ~ C"C')L / MAlL:POUCH6-612 SOHIO-BP ALASKA PRODUCTION DIVISION j.._.,' 2 C~ "¢ ANCHORAGE ALASKA 99502 / '/ "T'T'¢'% / State/Unlt/p&p TO: STATEAIaska oliO" &ALASKA Ga;. Conse~ation Comml.tO~,-~ ~ Ootobe~ 31, 1979 3001 Porcupine Drive ARcho:age, Alaska 99501 Attn: Mr. H. Hamilton REFERENCE: Well Data Transmission //~The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Magnetic taR. es for the following wells: H-2~ 9/2/79 #5'?01S B-12 . 8/25/79 #57025 8/17/7'9 #57031 9/7/79 #56064 Q-1 ~ 8/27/79~ #57017 Q-6 ~" 8/22/79 #57023 B-9~. 8/2.4/79 #57016 8/22/7 , 560 s7°2° TDT TDT TDT TDT ,/' & SOhiO 'PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION ' TO: State of Alaska Alaska Oil & Gas 3001 Porcupine dr. Anchorage, AK 99504 attn: Mr H. Hamilton ~., 3111 "C"STREE: !.': ~', - ANCHORAGE, AL/~ ANCHOrAgE, ALASK, September REFERENCE: Well Data Transmission The foil.Owing material is. being sUbmitted herewith. Pleas~dge receipt by signing a copy of this letter and returning it to this office:. ~ LOg's for the following Sohio op'erat'ed wells: Q-5 Spinner Log Q-6 " Q-3 " " Q-4 " " Q-1 " " B-13. " B-12 " Q-4 " Q-1 " Q-2 " 9/10/79 9/16/79 9./12/79 9/8/79 9/2/79 Run 1 I! I! II !1 Colette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA ;,,~.r-:!;.~ Oil & Gas Consolation .... i'o: cupine Drive ,'-", .c:~.: age, Alaska 99501 Att,n: Mr. H. Hamll'ton 3111 "C"STREET ANCttORAGE, ALASKA TELEPHONE (907} 265-0000 '.:,\I ~.: t'O~ :',:~ 6 612 A,%'C.-.O~,;AGE, At ASKA 99502 Sept.,her 13, 1979 Unit/P&P/Sta- te REFERENCE: Well 'Dat~ Transmission The following material· is being submitted herewith./Pl~cknowledge r. eceipt by signing a copy of this letter and returning it to this office:- Data for the following wells: B-13 Init/al Transient SXLrvey/Data Packet D-6 Key Well Transient Survey "" " Init/al 5¥ansient Survey " " " " '.' & spinner Q-2 ". " ~,, ,, 8/9/79 8/2/79 8/S/79 8/31/79 9/Z/79 Logs for the following '~,ells: G-5 CNL Rmn 1 Q-2 Spinner Run 1 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: SLATE OF AL,-.,~.,~A A~'r'::'!~a Oil & Gas Conserv,~lon Comml~ltl~l 3001 Porcupine Drive Anchor. age, Alaska 99501. Attn: Mr. H. Hamilton --COMM ._ CC, MM .~_ ' 3111 "~' S1 R ~T,",.'~ ANCHORAGE ~L~S~"" TELEPHONE (901~)'2~5:0000' ANCHORAGE ALASKA ~502~'~ . , .~ ~'.~'---'~ S tate/UnitV'P~ P REFERENCE: Well Data 'Transmission The following material is being submitted herewith. Ple)~e"acknowledge receipt by signing a copy of this letter and returning it to this office:-- J Logs for the following H-8 Spinner N-7 ~' Spinner B-i~ .SD inner .~Spi~nner B- 17 V Temperature B-15 ~'"' " B- 14 ~-?.~ " G-7 !--'''' " G-6 :~' " Sohio operated wells: Run 1 Run 1 Run 1 Run 2 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run. 1 Colette Tracy SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Alaska Oil & Gas 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Mr. H.-Hamilton J 't' J 8 I':,'~G ~C~O~, ~C~S~ ~ [ 3 GEOL MAIL: POUCH 6-612 J STA'T~'~C ANCHORAGE, ALASKA gg~ STAT ~e 20, ~979J ~ CONFER: { FILF: REFERENCE: Well Data Transmission The following material is' being submitt~ herewith.~ea~ acknowl~ge~ec~:t by signing a copy of this letter and returnin it to this office:- ' ~"~'~'~- ..-~/~ ~"~- 1 prin't' 'and 1' 'sepia 'for ~h'e 'followin{/Sohio ope.~a~e~ wells: 'B-1 Hydro log Run 1 Diff. Temp. Log Run 1 Spinner Run !  Fluid Density Run 1 Temperature Run 1 Temperature Run 1 F-5 Temperature Run 1 6/2/79, 5/31/79 i Colette "Tr~c'y Well Records DATE ~, / ,. ./ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION June 20, 1979 ANCHORAGE, ALASKP Alaska O±l and Gas Conservation Cc~.ss:ion 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. Hoyle H. Hamilton Chairman Gentlemen: Enclosed, in duplicate, is Form P-7, Cc~pletion Report for the above named well, together with the Well History. Very truly yours, PPJ: pk SOHIO PETROLEUM C-KI~ANY P. R. Judd District Drilling Engineer Enclosures cc: Well File.~17 Colette Tracy CC #9730 F(~rm P--7 -' SUBMIT IN DL~,~.~JATE* STATE OF ALASKA (See other in- structions on OIL AND GAS CONSERVATION COMMITTEE r.ve,-se side~ WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: O,I,W~.LL ~--] I;ASwELL ~-~ DB, ~--] Other b. TYPE OF COMPLETION: WELL ~ OVER EN BACK nESVR. Other 2. N.ME 0r 0PZRATO~ 5orlio Petro±eum company Division of Sohio Natural Resources Cc~kany 3. A~DRESS Or oPERATOR~ , · ........ Pouch 6-612~ Anchorage~ Alaska 99502 LOCATION OF WELL (Report location clearly and in accordance with any ~tate require~znts)* xt~ac~1611'~L~ 2070'SNL~ SOc. 31~ TllN~ R14E~ UPM At top prod. interval reported below 749'EWL, 332'8NL, Sec. 5, T10N, R14E, UPM At total depth 933'EWL, 842'SNL, Sec. 5, T10N, R14E, UPM OIl$11Jll 5. APl ~CAL CODE 50~029~20321 6, LEASE DESIGNATION AND SERLA~ NO. ADL 28313 ?. IF INDIA2{, ALLOTTEE OR TRIBE NA-M.E 8. UNIT,FA.R.M OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. B-10 (11-05-10-14) 10. FIEL~ A2qD POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil 11. SEC., T., R., M., (BOTTOM HOLE Pool OBJECTIVE) Sec. 05, T10N, R14E, UPM. 12. PI~MIT N'O. 78-54 ~'~=' 9/20/78'A~ S~UVD~D ~ Jla,~,j 10/15/78DA~ t:D.' ~~:.Ji'~,. 'i~~. J 6/6/79C0~-Y S~SP 18~ T~ D~H, ~ & TVD~9. PLUG, ~CK MD & ~D~. ~ ~LT~ ~L., 21. INTERVALS DRILLED BY 11100'~ 93~2'~ 11.057'~ 9352'~ zow~. ~ne aot~,, ~oo~ ~1 J c,,,, tOOL, ,l , ~; PRODUCING I~VAL(S), OF ~S ~M~IO~, BOSOM, N~E (~ A~ ~)- ~. W~ DIRE~ON~ : P~~ Bay Oil P~i -~ ~p 10296 ' ~ 8809 '~ , suRv~ ~DE ~ Yes ~t~ 10480' ~ 8942 24, ~E E~C~IC ~D OT~ ~S RUN DIL/SP/BHCS/GR, FEE/CNL/GR/Cal .CASING I~OP~ (Report all strings set in well) cAscO S~ZE | W?~', ~, I ~" ,', 30" x 20" !r~u. latc:~]. Coridl~¢tor 13 3/8" j 72#~' ' ,~J L-80 9 '8" 47~ 7"5/' ' I 29~' I I L-80, :..~ / z,-8o 26. LINER lq~ECO'l%D . 28. pERFO SffffilONS '[p~.~OTi (p~i .... _ . ~ t BDUC41,io~TTiiiff~i) I SACI~S CLWiENT* i'. ,, " size and number) 10296-10330'BKB 0.5" @ '4 spf (Ref. BHCS/GR, 10416-10426'~ 10442-10450' 10465-10480 7,O. i ii 110' ] 36" 279 ~.ft. ~cticset J 267~" Il7 1/2" 5964 ~.ft. P~fro~t 10011' 112 1/4" 1797 cu. ft. Class G & P~frost C 9493-1~1001 8 i/2" 515 cu. ft. J 27. TUB~G ~. ACID, StiOT, FP~'U~, C~:NT SQU~ZE, ~C. D~-I ~V~ (MD) [ COUNT ~D ~ND O.F ~~ U~ ,, DATE FIRST Pi%ODUCTION I PI{ODUCTION METHC~D (Flowh~.g, gas liit, pumping--size and type of pump) [WELL STATUS (Producing or l ,AT~ or TEST. [HOURS TESTED' 'JCHOICE SIZE JPROD'N FOR I 1 ; 31. DISP081TION OF GAS (80ld, used fOP fuel, v6nted, etc.)' J A~gl]ora~e 32. LIST 0~' ATTACHMENTS Well Histo~. 33. I hereby certify th~~Ogoing and attached information is complete and correct as determined from allVavailable records ' *(See Instructions and S~ces For AdditiOnal Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end Iog'on all types of lands and leases in Alaska. ~ Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- merits given in Cther spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separatc, praduction from more th~n one nterval zone (multiple co~mpletion), so state in item 20, and in item 22 show the p~cJuciag interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be seperately produce,."l, show- ing the additional dat,=~ pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMAJ~[Y OI~ F'ORMATION TF..S'I'S INt.'LUI-)IN(; INTEIq. VAL, TES'TED. PHESSI. JlqE DATA. A.N'D "JR~COVERIE.S'"OF OIL GASi- ' 35. G ]~X)L,OG I(' M A R KIgP~S WATt, Il AND MUD BKB Subsea Sag R. SST 10024' 8611' Shublik 10063' 8639' Ivishak 10172 ' 8719' . '~:. ~o~i~' ~^T^i" A'l~{'4~'i~ ':nnm~.'" '"'-~"~ii~'~N's.-a~4:'2"-"' '~'~"' ~: :';~T. hoz:oa.~.,,.~:~r~0L,~,; ~.{~A,~n~:%_ .... ~ .' ;'-~' ~-'z-"~ .... -' ':"";': ~ A~~'"- "-":~ ~'~ '":~:"~'" ' . .. . . ....................... ~ B-10 (11-0-5-10-14) Drilling Sept~_rz_~_l_9_7__8. ~ELLHISTORY Spud well 0600 hours, September 20, 1978. Drilled 17 1/2" hole to 2690'. Ran 70 jts. 13 3/8" 72# L-80 Buttress casing to 2675'. Cemented with 4464 cu.ft. Permafrost II cement. Performed three top jobs with 1500 cu.ft. Permafrost II cement. Installed and tested BOPE. Cleaned out to 2704'. Ran leak-off test. Directionallydrilled 12 1/4" hole to 8176'. October, 1978 Directionally drilled 12 1/4" hole to 10019'. Ran open hole logs. Ran 257 jts. 9 5/8" 47% L-80 Buttress casing to 10011'. Cemented in two stages: First stage with 1440 cu.ft. Class G cement; second stage through DV'at 2306' with 357 cu. ft. Permafrost cement. Arctic Packed 9 5/8" x 13 3/8" annulus. Tested casing to 3000 Psi, okay. Cleaned out & drilled to 10050' ,performed leak-off test to 0.64 psi/ft, gradient. Drilled 8 1/2" hole to 11100'. Ran open hole logs. Ran 38 jts. 7" 29% L-80 Buttress casing to 11100' with PBR top at 9493'. Cemented with 335 cu. ft. Class G cement. Cleaned out to 11057'. Tested 7" x 9 5/8" lap, no good. Squeezed lap with 180 cu.ft. Class G cement. Tested lap, okay. Displaced well to CaC12. Performed inflow test on 7" liner lap, no inflow. Ran 240 jts. 7" 26% L-80 AB-IJ-4S tubing to PBR at 9493'. Displaced tubing to diesel, landed tubing with ball valve nipple at 1999'. Tested tubing to 3500 psi. Installed and tested tree. Released rig at 1400 hours, October 24, 1978. Perforation May-, 19791 Pressure tested tubing and inner annulus-, June, 1979 ~Ran t~ature survey-fromT.D, to 5000 ft. BKB. Pressure tested equi~t, wai~h~g on rig move. Perforatedthefollc~ing intervals, at 4 s.p.f, with 4" carrier guns. 10296 - 10330 ft. BKB (Ref. BHCS/GR, 10~15-78) 10354 - 10406 " " " 10416 - 10426 " " " 10442 - 10450 " " " 10465 - 10480 " " " Flowed the well to clean up perforations. SSSV. Ran static pressure and temperature survey at 8800 ft. TVD ss. returned to production. II Il' ~ ~" ' ~t ,., ~' ~ 9/: , AtICt~ur~&~~ "" ..... u.::: Set ~d test~ ~s~t sleeve ~a Well SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION June 19, 1979 State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 Attn: Mr. H. Hamilton Subject: Well B-10 (11-05-11-14) Well B-ii (11-06-10-14) Gentlemen: Please find attached in duplicate Form 10-403, Sundry Notices and Reports on Wells, and Form l0-404, Monthly Report of Drilling and Work- over Operations, for the above-mentionedwells. Very truly yours, SOHIO PETBO~CO. District Drilling Engineer cc: M. J. Smith A.E. Leske Drill File I £C, EIVED ~ t, 3 0 1~79 Form 10-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent,Reports", in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) [] GAS 1. ~/LLLL WELL OTHER 2. NAME OF OPERATOR ~%hio Petroleum Co.; Div. of Sohio Na~]~l R~ur~.~ Tn~_ 3;'~'ADDRESS OF OPERATOR Pouch 6-612, g~chora~e, Alaska 4. LOCATION OF WELL At surface ~ 2070' SN1, 1611' WEL, sec. 31, TllN, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 64.29' AMSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28321 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudtx)e Bay Unit West 9. WELL NO. B-10 (11-05-10-14) 10. FIELD AND POOL, OR WILDCAT Pru~ Bay, ~ 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 05, T10N, R14E, UPM 12. PERMIT NO. 78 -54 3ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF l~ PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF E~ REPAIRING WELL FRACTURE TREATMENT~ ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. The following intervals in this ~!1 were perforated for production using 4" DML XXIII guns @ 4 SPF. A temperature survey was conducted prior to perforating. 10,296 - 10,330 Ft. BKB (Ref. BHCS/GR 10-15-78) 10,354 - 10,406 Ft. BKB (" " " ) 10,416 - 10,426 Ft. BKB (" " " ) 10,442 - 10,450 Ft. BKB (" " " 10,465 - 10,480 Ft. BKB (" " " After ccmpleting perforating operations a static bottQm hole pressure was recorded and an SSSV was run in the nipple ca 2000' BKB and tested. This ~rk _was completed in J~ne 19.79. i ,ECEIVED (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE District Field FsAgi~eer TITLE DATE See Instructions On Reverse Side Form No. 10404 SUBMIT IN DUPLICATE STAT E 0 F A LAS KA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50~029~20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28321 1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME OIL ~] GAS [~] WELL WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Company Division of Sohio Natural Resources Ccmpany 3. ADDRESS OF OPERATOR Pouch 6-6'12, Anchoraqe, Alaska 99502 4. LOCATION OF WELL 2070"SNL, 1611'WEL, Sec. 31, TllN, R14E, UPM 8. UNIT FARM OR LEASE NAME Prudhoe Bay' Up/t West 9. WELL NO. B-10 (.11-05-11-14) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay; P~3_dhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 05, T10N, R14E, UPM 12. PERMIT NO. 78-54 13.REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK lN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. May 27, 1979 June 2, 1979 June 3, 1979 June 4, 1979 June. 11, 1979 Pressure tested tubing and inner annulus. Ran temperature s~y from T.D. to 5000 ft. BKB. Pressure te~ equipment, waiting on rCg move. Perforated 't~ following intervals, at 4 s.p.f, with 4" carrier guns. 10296- 10330 ft. BKB (Ref. BHCS/GR 10/15/78) 10354 - 10406" " " '~ " " 10416 - 10426" " " . ,, ,,r 10442 -- 10450" " " " " " 1046'5- 10480" " Flowed the well to clean up .perforations. Set and tested insert sleeve and SSSV. Ran stat/c pressure and temperature survey at 8800 ft. TVD ss. Well returned to production. TITLE DATE NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. SOHIO-Bp ALASKA ., soHIo PETROLEUM COMPANY Division of Sohi° Natural Resources Company PRODUCTION DIVISION Alaska Oil and Gas Conservation Ccrm~ssion 3001 Porcupine Drive Anchorage, AlaSka 99501 Attention': Mr. H. H. Hamilton Attached in triplicate are Sundry Notices and Reports on Wells, Form 10-40'3, for' the following wells: Q-1 (24-09-11-13) Q-2 (32-16-'11-13) Q-3 (11-15~11-13) Q-4 (43-09-11-13) Q-5 (31-15-11-13) Q-6 (43-10-11-13) 1-06-10-14) 11-05-10-14) B-11 (11-06-10-14) B-12 (43-31-11-14) B-13 (44-36-11-13) GJP:ja Attachments cc: Well File #17 - Drilling P.E. Well Files Dev. Eng. Yours very truly, Sp~IO PETRO~ COMPANY (~. "J.<~isga ' District Field Engineer Form ! 0-403 REV. 1-10~73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELLii OTHER 2. NAME OF OPERATOR sohio Petroleum company Division of Sohio Natural Resources Inc. 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL At surface 2070' SNL, 1611 WEL, Sec. 31, TllN, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 64.29' AMSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28321 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West 9. WELL NO. B-10 (11-05-10-14) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 05, T10N, R14E, UPM 12. PERMIT NO. 7854 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF L-J PULL OR ALTER CASING L-._J FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals, in this well will be perforated for production using 4" DML XXIII guns- @ 4 SPF. A temperature survey, will be conducted prior to perforat/ng. Zone 4: 10,296 - 10,330 Ft. BKB (Ref. BHCS/GR 10~15~78) Zone 4: 10,354 - 10,406 Ft. BK~ (i"' " " ) Zone 4: 10,416 ,--, 10,426' Ft. BKB ("~ "'~ " ) Zone 4: 10,442 ~ 10,450 Ft. BKB (" " " ) Zone 4: 10,46'5 - 10,480 Ft. BKB ("' " " ) After completing perfcrating operations a static bottom hole pressure will be recorded and a SSSV will be run £n the nipple Ca 2000' BKB and tested. ~is work is-progranm~ed for June 1979. . ..~,' (This space for St APPROVED BY / /~;'~'~""~ TITLE CONDITIONS O~PPROVAL, I District Field Engineer ORDER OF THE See Instructions On Reverse Side DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA Alask~ Oil & Gas Conservation Commi~mlo~ 3001 Porcupine Drive Anchorage, Alaska 99501 Att, n: Mr. H. Hamilton LK_.I COMM ' "[/_-. I'RES I--'~ ;~-' rz '""~ [I",;'~'.' ANCHORAGE ALASK .... ~- ©~)L · '' TELEPHONE 1907)265- ANCHORAGE, ALASKA//"STAT TEC-- State/P&P/UnitI CONFER: Hay 16, 1979 I"FILFi- REFERENCE: Well Data Transmission The following material is being submitted herewith>,~i~se acknowl.edge receipt by signing a copy.of this letter and returning it to this office:- ~ '~'b-~..~'~/"~//.'7/~' ' 1 copy of the folloWing magnetic ta~ for Sohio operated wells:  TDT #54330 8/15/78 Open hole #54561 10/15/78 vu-4 CNL #54213 9/16/.78 Q~2 OH #54255 11/4/78 °]ette Traby- Well Records SOHIO PETROLEUM COMPANY -?,:~ ..... f ~.? ..... rural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Divison~of Oil & Gas Conservation 3001 Porcupine Dr. Anchorage, AK 99501 Attn: Mr. H. Hamilton 311i ' " Af~CHO F;~kG E, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 November 17, 1978 REFERENCE: Well Data Transmission The. following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 1 print and 1 sepia for the following wells: F-3 B-4 13-1 B-9 RECEIVED DATE ~rod. Log ~CNL 'CNL . _~HCS ~--~-~-N~'?,-~:DC-TVD · . "FDC ..,.' ~-"DIL Run 3 5" Run 2 5" Run 1 5" Run 1 5" Run 2 5" Run 1 5" Run 1,2 2" ~.~,.. .... 1,,2 5" & 2" Run 1 5" & 2" ~ , 2" ~uu 1 & ~Run~l 2" " .... ~ Q~ ~ Run 1 2" Run 1,2 2" .; C01~t'te Well Records SOHIO PETROLEUM COMPANY ,. Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: State of Alaska Departmentof Natural Resources Division of Oil & Gas 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Mr. H. Hamilton 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 November 7, 1978 REFERENCE: The following material is being submitted herewith, Please acknowledge receipt by signing copy of this letter and returning it to this office:- Q-1 GYroscopic Directional Survey B-10 " " " 1 print and 1 sepia for the following ~~Y~ CNL / FDC Run 1 5" -~---~FDC Run 1 5" BHCS Run 1 5" DIL Run 1 5" wells: Q-1 FDC Run 1 5" RFT Run 1 5" DIL Run 1 5" BHCS Run 1 5" CNL/FDC Run 1 5" 19 Colette Tracy ~¢'~"I Well Records RECEIV CONFIDENI'ii.,C SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. H. Hamilton Director Gentlemen: ,.W,el~ B-10 (11-05-197,14) MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 November . ,3~C,~ (.k. ........... CGNFE~: ....................... F~LE: Enclosed, in duplicate, is Form P-7, Ocmlpletion Report for the above-namedwell, together withtheWell History, Well Logs, and Directional Survey. This well has been suspended pendingperforating operations to beperformed at a later date. :'.'~ Very truly yours, PRJ: ja SOHIO PETROLEUM COMPANY District Drilling Engineer Enclosures cc: Well File'!S17 Colette Tracy RECEIVED · SUBMIT IN DOr'~ICATE* STATE OF ALASKA <See other In- st ructions on OIL AND GAS CONSERVATION COMMITTEE ~,~.~ ~ide; i IL I WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* · ~ la. TYPE OF WELL: OII, [] '~AS~ ~ ~-~ " WELL TVELL DRY ~ Other . h. TYPE OF COMPLETION:' WELL OVER EN BACK RESVR. Ct..e-~hr ~ ,, 2, NAME OF OPERATOR ~o Pe~le~ ~~Y.L...Div'. ~° Nat~al :~~ces ~y 3. ADDRESS OF OPERATOR Pouch 6-612,. Anchoraqe, Alaska 99502 4. LOCATION OF WELL (Report location clearly and in accordance with qny State requirements) Xtsu~ace 1611' WEL, 2070' SNL, Sec. 31, TllN, R14E, UPM At top prod. interval reported below top SageR. SST. 669' EWL, 166' SNL, Sec. 05, T10N, R14E, UPM ,.i~ At total depth 993' EWL, 842' SNL, Sec. 05, T10N, R14E, UPM CONFIEtENTi $. AP1 NUM3E, I:~CAL CODE 50-029-20321 ~. LEASE DESIGNATION A_ND SERL~I. NO. ADh 28313 7. IF INDiA. N, ALLOTTEE OR TRIBE NAME 8. UNIT,FA/IAi OR LF~kSE NAME Prudhoe Bay Unit Prudhoe Bay, Prudhoe 0il SEC.. T., a., M., (SO~OM HO'-~- POOl OBJECTIVE) Sec. 05, T10N, R14E' UPM 12. PERa'VIIT NO. 78-54 9' AMSL 37.24' AMSL TOTAL DE.H, ~m & TvD~9/PLUG,~BACK MD & ~D~. ~ ~LT~LE CO~L., [ 21. ~-~ "INTERVALS DRILl,ED BY [ HOW~Y* { ROTARY TOOLS .... ] '' CABI,E TOOLS 11100'~ 9382'~ [ 11057'~ 9352'~ [ ~ne [ ~1 t PRODUCING ~VAL(S), OF ~IS COM~TIO~TOP, BOSOM, NAME (~ AND ~)* ~23. ~VAS DIREC~ONAL ~ SURVEY MADE None ~ ~ Yes i T~E E~CTRIC AND OTH~. LOGS RUN DIL/SP/BHCS/GR, KDClCNLIGR/Cal C;~SI2gG SIZE 13 3/8" 9 5/8" 7" ,, 26, LINER lq/CC O~TD 28. PERFORATIONS OPE2N TO PRODUCII~I ~ ON' (interval size and number) None ! : CASI2XrG RECORD (Report all strings set in well) Instate. ~nduc~ :io,',', ! 36" 279 =.ft. ~cticset ,, 1 72~ [.. L-80[ 2675'[ 17¥' I 5964 ~.ft. P~fmst I[ . 47~ i/L-80 I 1001]' 12~" [ 1797 m~.ft. Class G & Pe~frost C i bd 3-zn00' 1 s%5 m.f . mass l SC:LE~ (5{D) J SIZE [ DEP~ SET (MD) ~ PACI{ER SET (MD) ' 7" ~ " 9513' -. ' ~ .... Oivfelon ,f 611 /% i.i~.~ PRODUCION ~. [V/ELL STATUS (Producing or and of pump~ DATE FIEST PI%ODUC~ON ~ODUCT1ON MEII{O,D (Flowh*z, ~a3 lif~, p~mpkig~size type . ~OUaS TESTD [~-tOXE SIZE [PEOD'N FOE DATZ OF T~ST, OI~BBL. GA~CF. WAX'E~BBL. GAS-OIL IL%TIC FLOW, ~*BING CA~hNG PRESS~E [CALC~ OI~BBL. GA~-~CF. WA~--BBL. [OIL GRAVITY-~I (CO~.) 1 i ,,, i ,, ,, ,. ,, , 31. DISPOSITION 0r OAS (Sold, used lor ]uel, vented, etc.) ~TZST WITNESSED 1 a2. cm~ o~' ~T{kC~M~NTS Well Histo~Well ~s, Directional s~e~ 33. 'I hereb~ certify~~reg0ingand attached in format,on 1~ complete and e orr e et a~ determined from alVavallable records SIGNED __ F. ~~a - , -~--- ' .'] .... ' : *(See Instruction~ and Spaces [or Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in Other spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separatc production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the plc. Jucing interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reporled in item 30. Submit a separate report (page) on this form;,adequateiy identified, for each additional inte, val to be seperately produced, show- lng the ackJitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28:: Submit. .a separate completion report on this form for each interval to be separately produced. (See instruction ,for items 20 and 22 above). 34. SUMM~RY OF ~'O~h~AT'IbN TES'~S INCLUDIN(; INTERVAL TESTED, PR~UR~'"DATA ~ ~0V~I~ OF OI'Lj GAS. WA~ AND MUD NA~ ~AS. ~ ~ V~. B~' S~sea .... , Sag R. SST. 10024' 8611 Sh~l~ 10063 ' 8639 Ivis~ 10172 ' 8719 ,,, , ~ ~.'~ DATA, Aq~'A~I[ 5R'I~F ~Rl~moNs oP 'LIT!lO'LOGY. ~ITY, FRA~. .A~~ .DIP~ WELL B-10 (11-05-10-14) WELL HISTORY September, 1978 Spud well 0600 hours, September 20, 1978. Drilled 17 1/2" hole to 2690'. Ran 70 jts. 13 3/8" 725 L-80 Buttress casing to 2675'. Cemented with 4464 cu.ft. Pezmafrost II cement. Performed three top jobs with 1500 cu.ft. Permafrost II cement. Installed and tested BOPE. Cleaned out to 2704'. Ran leak-off test. Directionally drilled 12 1/4" hole to 8176'. October, 1978 Direction. ally drilled 12 1/4" hole to 10019'. Ran open hole logs. Ran 257 jts. 9 5/8" 47# L-80 Buttress Casing to 10011'. Cemented 'in two stages: First stage with 1440 cu.ft. Class G cement; second stage through DV'at 2306' with 357 cu. ft. Permafrost cement. Arctic Packed 9 5/8" x 13 3/8" annulus. Tested casing to 3000 psi, okay. Cleaned out & drilled to 10050' ,performed leak-off test to 0.64 psi/ft, gradient. Drilled 8 1/2" hole to 11100'. Ran open hole logs. ' ,, .Ran 38 Dts. 7 29# L-80 Buttress casing to 11100' with PBR top at 9493'. Cemented with 335 cu. ft. Class G cement. Cleaned out to 11057'. Tested 7" x 9 5/8" lap, no good. Squeezed lap with 180 cu. ft. Class G cement. Tested lap, okay. Displaced well to CaC12, Performed inflow test on 7" liner lap, no inflow. Ran 240 jts. 7" 265 L-80 AB-IJ-4S tubing to PBR at 9493'. Displaced tubing to diesel, landed tubing with ball valve nipple at 1999' Tested tubing to 3500 psi. Installed and tested tree. Released rig at 1400 hours, October 24, 1978. spe -sun P.O.Box 6207, Anchorage, AK 995 ~J. A. Fouch[, President November 3, 1978 Mr. Gary Plisga 3111 C Street Anchorage, AK 99503 Re: Our BOSS Gyroscopic Survey Job No. BOSS-16322 Well B-10 Prudhoe Bay Field North Slope, Alaska Date of Survey: October 26, 1978 Dear Mr. Plisga: Please find enclosed the ".Original" and eighteen (18) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Bw/rw Enclosure Yours very truly, Bob Wilmeth District Manager O-BP A I.E LL B-10 r-P I.}D HOE HAY ~l Z~SK~ DCTOBER 2f, lg78 OCTOBER ,"JOe 197~ ,JOB NUMBER BOSS-16322 KELLY BUSHING ELEV, = 64.,29 FT. VE:Rf'"IC"A'::~':''' "¥E'~'~Y~';'~::~:"~"'~'~''''':'' "'~]: P'~"C.'Y'i::"~':'~::':':':''''':':?':~:'~'V'E~i'TY''':''':''' ' '~ ~ cT~..~G~Ln~.:........~.:~..6.~.~:~:.~i:.:~.~..~:~:.:.~:.....::.:.......`...v~R Y~~ ...... DEPTH DEPTH DEG MIN DEGPEES EEG/1DO NORTH/SOUTH EAST/~EST SECTION ~::~:':'.~i~:~:}~;~:~ ~:~:'~ ?/:'.'~,;~i?f~:~;::~:~:~:~ ::::::::::::::::::::::::::::: <" :'/:-.'~::'" :': ::::::.:'::~'~::.::~;~. ~:~<~.~? ~:~<~:~%:<:<::::.:.'~e ~:.:' ..'.'":::::~-...:'..:~:-: <'?::~:~'¢~'~:~::~.~.'::?':?-': ~<'.> :-'~<.?~:?.~:~:~:~::;:.:~':~.:::~ :-? .' -. ~ ~ '~':' s' ~,"~'o .... ?"'" ':":':":~ Ss"Y'T:'~'::"~"::':'"' :'"""'~'':" ~'~ ..... s'::"'i'?'";?:'~:~":'??O~:::' ~'"'"":~" .... :"'~:""?;'~'Y'"":'" "': --~;~ .......... 500 600 ~..-: 700 P.,O0 gO0 1000 1100 1.200 1300 1AO0 ]500 399,99 335.70 0 A2 N ~9.GO %¢ .25 ,20 g 1,8A qgg.g~ A35.G9 ! 0 N 86,20 %7 .30 .lq S 3,32 1 1299 1399,92. l~gg.gl 835.65 0 23 N 935.65 O 20 N' 87,q0 W .07 ,21 N 1.035.65 O 37 1535.63 0 5 ' '34 -" 1A35,62 · 1535.61 0 .2.8 ~ 59.10 W .Al A 12,79 1635.61 O 3e N 78-20 g .25 1;3.68 17.35.60 0 1 835. G'~ O 22 .~7' 20 · 2135.59 9 5~., S l~,GO E .57 3,G9 N 1G,38 2235,57 1 5 S 15,50 E .20 2.02 N 15.97 ~600 1700 1800 1'900 200'0 2100 2200 2300 15qq.qO 169q.m.O 1799,~9 1999, 8'9 209g,89 2199.~R 2299.86 2,AO o 250 0 P~,oo 2700 2¢,00 2900 ~ 0 O0 5:.'.~.0 2599 :: 2535 269o.6~ 26 35...,. 27gg.59 2735.30 289g.32 2R35.03 I 58 3 o A 5° S 44,50 E 2.0A 12,38 S 9.70 S 51.~0 E !.90 17.02 S A,36 -3,63 -A,2R -5.12 -5.65 -8.0.~ -9.5 ,.2- ..... -1 1..~- -~2.33 '-12.85 -11..q6 -10,33 -5,01 -1,80 1-;'l"T ..... 5.17 kELL B-lO FRUDHOE B/~Y OCTOBER 399 197P ALASKA PAGE- dOB NUMBER BOSS-16322 KELLY BUSHING ELEV. = &A.29 FT, FFPTH DEPTH DEPTH DEG MIN DEGREES CEGtlO0 NORTH/SOUTH EAST/WEST SECT IO~) 3500 3q~2.2R 3~27.51~ 1.3 2A S 39.80 3600 358g.06 3524.77 15 q2 S 36.10 .3700 ~'800 - 377c),'I5., 3900 3872.06 qDO0 3q63.17 AIOO 4052.22 A200 413P.g/+ q3O.O q223.22 q q 0'0 430'5.0 9 q50'O 4383o91 aGO0 4~qG .n.37 A700 A536.g2 AP, O0 4Glq.DP 5200 492q.5A 5300 500P_ .30 5/+00 507q.19 550'0 5600 5700 , EEO0 5900 5.03 . 3,8.~ 7"· 7' ~'21,96. 38 LIR .,q..q P5 :36 S 29. q,O ?.6 39~7.q3 28 30 S' 28.80 E 2.91 257.A, 6 S 1.70.00 308.50 q074.65 31 13 S ~8.50 E 2.72 301.15 S lC.):.'). 358.1.~ -A~: ' A. 68.6 )1 °6,2:'::: ': i:...':3.60 4'! 52.q.G /+396.08 q9 32 ~z)72.63 3q .'55 S 3~+.2D E 2.68 567.85 S E 658. aSq. 9.7g ?q 25 S 3/-+.20 E .17 620.AE, S E '~782.20, 38 ~860o25 ...R q6 · - q'938.01 'lq 9 S 3:3.20 E .q3 881.10 S 5~G.52 E 5DIA..cl.o qO 2~ S 3:3.50 E 1.20 73A.50 581o6:,7 E · s qO 37 S 32.90 E .21 115 5aS°..7Z~ 5.'!.q5.A5 32.70 E .qA 12.06.68 S T58,01 E · 5535.P2 5q71.53 3A,. 0 E .90 1260.88 S 793.6q E '61 0.0 8q8°51 911.33 973.'R'3" · 1036.70 1100°63 1230.11 l~2q.q3 lqqg. R3 '555.]. '~.~ - TO-BP ~ E L.,L. B-lg FRUDHOE BAY ~L ASK.~ CEPTH DEPTH DEPTH PAG[ ~ 'OBER '26,~ I978 OCTOBER 30, 197~. ,jOB NUMBER BOSS-16;522 KELLY BUSHING ELEV, = 6A.29 FT. ~...~..... ., .COUR $ E. . C OUR SE..:, G.: ::'~ .... ih:C:L"i ~ 4'y 'I'~N '::' ~'i: "'~ C"i"~'6'~':';:':"';'"'":':~'~':V''IR gEG MIN DE'GREES D~G/IO0 NCRTH/SOUTH EAST/UEST S~CTTON 620 0 6~00 6500 6606 6700 5915o00 58")8° 5988.27 592;5og~ 606;5°5§ 5999°26, 6~.00 69O0 7O00 7100 7200 7...zOO 6520.73 7 750 0 '.--:~: 7'60 0 776 0 68 7800 6916.72 7900 6997,77 8000 .. P.. 100 .. 82ao · 6~02.6~ 6,~79.31 ~$00 PSO0 16,86, ~6 1 '7'52 · 1 6 ql- 5 A1 16 S 3q.80 E .Iq 1586.09 S 1016°25 E 1~3.72 ql q $ 3").60 E .P4 16q0.20 $ 1053.70 [ 19~tc}.50 ~. 2 lq'5 · 5 6 =o 5~ S 3' 39 55 S 35.20 E 9 1907,17 S 1238,83 F. 227q.1~ ~9 R S ;57.90 E 89 1958.29 S 1.276.71 E ~337.66 S )8. 0 .36 219P.28 S lq, 65.22 E 26ql. S 38.30 .qf~ 22qq.$q S l§Ol..ql E ~699.7A 6, .02 .~ 9 ~,852.q3 ;56 6933.~8 35 25 . FL · · 7q04o91 73q0.62 7")85,72 7z+21.q3 2814,9 5 72,~g 35 8 S 37. 0 £ .5~ 2q73.56 S 1679.39 ,r_ 29P, 8.R~ .'57 2 S 37.10 'E 1.90 2520.56 S 171~°RR E 30q7.c6 ~700 8800 771 .~000 7~57.79 7793°50 ~100 ' 792R.qq 786q°2n 1~2 O: 0I- ' 7999.67 7955o3~ qA ,)5 S ~5.80 E .gq 2788.17 S 1913.17 E ")5 16 $ ~6. 0 E .54 28A5.q6 S 195q.~',q E ~ ~ --'5 ~ .... ~ 3'6":20 E ' 5':. ':::,1~96'g2 · 3172.67 · . 323g.29 .~£HIQ-BP ~L~,SK'A ........ 1978 WELL B-1 0 FRUFHOE ALASKA ~ASURED ?EPTH OCTOBFR 30 ~ 1978 ,JOB NUMBER BOSS-16322 K~LLY BUSHING ELEV. = 6~,29 FT TRUE ' T'"':"':"?':": ~'...SUB:,,S.~.,'<'~ A' :'"~:!";~ .,. :,..... COUR 'SE., -. ,C eUR.,~, .:.,..,,,. ...... ' <'" "",.. '": ::' ':TOTAL ,. VERTICAL VERTICAL. INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES .... DEPTH DEPTH DEG ~IK DEGREES DEG/IO0 NORTH/SOUTH E~ST/WEST SECTION °600 ~295.~9 8231.20 9700 837~.~7 8~07.0~ °800 8~6.34 8382.05 qgo0 10000 I 0050 862~' .5~ 10100 8665.~5 860Io66 10200 P759.21 R67~.92 10]00 8812.51 87~8.22 0~6 0 8856-I 0400 ~500 ~) C6DO 902~.1q 1 0636 10700 9099.28 1'0775 9152.52 108~'0'":': 9170.22 10900 "92'qO*Sq 11000 9311,q0 ~ 105n. 9346.70 .11100 ~382.01 R989.55 9088,23 91 ~.9176,55 9247.11 9282.~1 9317o72 ...;.'::>:.?....,.'...,,..:..:.:...~ ..:.:...':('/.~.Q .~L.... :.. ;.; .' '2 ". ': ..... :. ..... Al. 3 S 29.10[ ,91 3182,21 S 2177,92 E '385q.51 ql q9 S 28.q0 E .90 32q0,22 S 2209,75 E 3920.53 ~5 q S,25. 0 E .39 S ~2 38 S. 26.10 E .58 3q83.73 S ~331.78 ~3 6. $ 25,90 E ,q9 35AA,88 S 2.361,60 ?':.~ ~, 0 89 · 79 q191.36 q25R.g2 POR 1 20N T.A 'OPE C~LCULATION PROCEDURES ARE BASED l.q7 .15 ON THE USE ,59 E' 71 F ~327,2 ~ ,3755. 3796 S 25R8.65 5 A781,18 81 S 2603.75 E q816,2~ ¢ CHT [~-BP 8L A,SI(A OCTOBER 30~ 1~78 dOE NUMBER BOSS-16322 KELLY BUSHING ELEVo : 6qo, 2q FT. TRUE SUB-SEA TOTAL NE A~,URED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL 'i'~d-----~.~'~ .... ' ..... ""~".".'-~:~'.~',.E~ ......... · ....... · .................... ' ......... -'~:~"~'"':" .......... .......... .o~ ..... PO00 19~5,G0 4,g8 N 16,0~ Y ,11 ~000 29~.5~ 23.25 S 3.22 E 1.17 1.0~ 50'0 0 GO00 lg9go~g 2998, 83 5535-82 7000 6200,51 6226,2 ~.000 7079,3{3 7015,01 °000 7857,79 7793,59 10000 ~ )_]fJC. O 93'1],A0 ":9 ,1.. ~ 0.~ ~_28~.65 S 1537.~-5 El// 920.70 211.21 27~P.,.]7 Sv"/ 1913,17 E ,/ 11a2.2I 221,51 3987'75 281,79 q~ n. 5. I ,~.1. E 1 71.7,99 29,q. 0 THE CALCULATION PROCEDURES ARF BASEO ON THE USE OF THREE DIPENSIONAL flUS OF CURV,aTURE' METHOD. <. C lq ! C-BP 6FLL R-1 0 FDUDHOE RAY :~ SPERRY-SUN WELL SURVEYI:hG COMPANY PAGE . iANCHORA. ALASKA. ' : : OF SURVEy OCT QBE.F{......2.6, 197R COMPUTATION DATE n 1978 UOB NUMBER BOSS ~G~22 OCT,.,RER 30e - KELLY BUSHING ELEV. : EQ.29 FT. ,Nr~URED rFDTH O 6q TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR (,OORDINATFS MD-TV~. VERTICAL 664 7GA 100,,00 .DA S .3~ W .,00 .00 200.00 .05 S .SP W .00 .DO 'oo 76/4.29 864.29 i26',.29 lqGq,P9 lqOO.nn .156q - ::: O GOD,q0 700.Cfi 800.09 1.74 N 11.2~ 3.16 N ! 1.82 · 05 .01 .06 .OIJ .ID"? .01 .01 .: .~ C H: O' B P' : ~.-.:::. :::.:::: :::.:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::: ::.:::::::::: ::. /~ L A.:,K~: :.:.. . FRUDHOE B~Y OCTOBER ~0~ 1978 ~OB NUMBER BOSS-l~22 ~L~SKA KFLLY BUSHING ELEV, = Gq,29 FT, . : :: :::: : : ~':: :::r::: :::~ ::::: :~::::::::::::::::::::::: ::: '::.::.:: :::::: ::: :::::::::::::::::::::::::::::: :::::::::::::::::::::::: :::: '::"::::::::::i:::: :::'~:::~ .::: :' ::: ::: ~:~:::~ ~:: ::: : :::::":: :,::. : ': ::' ' :':: ~: ::::3:: ::: ~':: :::: :'::::~ ::::::' :: ::: ': ;::; :': :'::':'': :::~ ~:::: :: ,'::::'::: ': :: :.': :::::::::::::::::::::::::::::::::::: ::~: ~ ::"~ ::'::::~:::;:~::::f :: ::':: ::::::::::::::::::::: ::::::::::::::::::::::::::::::: , :,::.: ~ ::D :,:::. o ~::., :,:.[ v :, ~ :,.:?:.:.:[ TRUE SUB-SE~ TOTAL ~[~U~D V~.T[CAL V~T[CAL R~C~'A~ULA~ COORD[NAT[S MD-~V~ V~RT~C~.L · .::,:::. ::::.::: ============================================================ :.::':'::. .. 206~ 206~,29 2000,00 5.13 N 16,30 216~ 2164.29 21.90,00 ~.22 ~ 16,52 W ,12 ,00 : '~2 2:6 ::.::-::::: :.' ~ .....~:~.~ ~oo'":' .... .o.: ' ...... ....... ..... ~','~ s'':~:'':''''' ......... P&6~ 266~,29 276~ 276~+,29 SO6 5 ": :,.. 3267 3678 2600,00 8,01 S , lP,02 ~{ °30 ,06 2700,00 10,99 S 11,06 W ,36 ,06 PAGF, ~ OCTODER 50, 197~ dOB NUI~BEr BOSS-16522 KELLY BUSHING ELF_V° = 64o. 2g FTo a TED :...:.' .... ....' ...... . ~' ?.. ?;'.?:~.,. '.....:,.';.;. "-:~-~,,< TRUE SUB-SE8 ~r~SURED VERTICAL VERTTC/~L 38.91 ~001 4qTz;:' ~605 ~7~5 5122 5251 3RG~.29 3800.00 3964.29 3900°00 ¢464.29 ~400.0 0 4564.?.9 4500.00 4664.29 q600.O0 TOTAL RECTANGULAR COORDINATES MD-TVE VERTTCAL ,: u ': · ' ' . . ', .; ..'... : . ~l~ : , . . ... ..?::;. :.. ~: i' .; .... )' : ..?. ~,'..: ~ ' ~:,~':~':~:~<::~:.:..;':~:~.~,::, '. " ' "." " .~:::~'~S'"2~:-~'"""'~::'~''-'' .................. '"'";"'~'~'S'"','S:'a'"'""e'"::"'"'"';:""':":" .......... ':'"~"":~'f';"~"~:":"'~'""'"':'""" .............. ' ........... " .................... '~"'"'Y;'"~"~ 21R.20 S 1~8.16 E 36.95 9.67 ~63.27 S 173.1g E ~g.AR 12,52 516.~1 :301.15 1 586,57 S - 346.~8 E 171 654.52 S 392.78 E 2~0o70 29,~7 53Rtl 506~.29 5030,00 5511 5164.29 5100.00 ~95.07 5642 526q.29 52~0, O0 1066.12 577~ ' 5gC5 '":'5~ . . 603 7 ' 556~:-2-9'"' .00 " 621,42 E 347.47 31,31 667.36 ~'r 378.47 30 ff CH I O-BP I, ELL B-10 FP UDHOE OCTOBER 30e 1978 dOB NUMBER BOSS-1G322 KELLY BUSHING ELEV. = G~.29 FT. TRUE SUB-SE~ TOTAL FEASURED VERTICAL VEPTICAL RECTANGULAR COORDINATES · ,:,:,.~.,-.~:.'?..~ ,.~::~:,..,:??~::.~.~:.~;:,~?~:~:~.:.~:.~..~?~.~!:~ ~:.::..,?~i~?::~,~;:':,:~:~.~.:~:~:~,~,~:~:~::~:~?,~,~~ ~I ~~:~:~;~:~'~::~.~:~:~ 6~02 57G4.29 5700,00 lq2~,~ S ~55 586~.29 5800,00 1~97.15 S '"'6 7 O: 0 7096 7226 7,356 656~.29 6500.09 MD-TI/D VERTICAL 1R 1921.32 S 19fl6.15 S 12~8.81 E 762.69 30 oq. 2 129R.A5 E '~91,80 29o11: 7858 GgGq .29 69 7981 706q,29 7000.00 RlOq 716q,29 7100. O0 2281.3A S 2337o01 S 1550.79 E 91.7.31 .6fl j 157q.6~ E 939 °89 °58 ~CH]O-.BP aLASKA ~FLL B-1 o FRUDHOE D,.~Y PAGE :. oCTOBER 2G,~ 1.978 OCTOBER 30, 197g dOB NUMBER BOSS-16322 : KELLY BUSHING ELEV. = 64.29 FT. TRUE S~JB - MEASURED VERTICAL VERTICAL CE'PT , ::, H 87;30 766q.?9 7600.9n TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL 1a8,6 7 7764.29 7700.00 9009 786q,29 7890..00 m96o ~j n 097'" I D23~. 1 ¢.371 1 ,c51D 06-5 0 10791 1 0,93'5. 11074 8700,00 8964,29 8909,00 2711.99 S 1857.46 E 1102,85 36.97 2793,4P. S 191G.gq E lit+ti.86 ti2,01 3102.5q S 2132.86 r 1204,84 3176,82 S 2174.93 S 1326.33 3254.35 S 2217.3~ E 1359.8[; 9064.29 90DO,PO 93 . .. -OD . 358 3676.q0 S 211211. q3 3764.76 S 2467.69 71'0 'i..62 31.119 3.3.117 $ 6 ' 10:' <'!- :37.54 ' · ':!(:i':;' ' · I, FLL B.-!~ FF, U~HOE B~¥ OCTOBEP ~O~ 1978 dOB NUMBER BOSS-IGC22 'KELLY BUSHING ELEV. = 6Q.29 FT. TRUE SUB-SEA TOTAL SURED VERTICAL VE~TTCAL R E CT~Nt~ULAR COORD.TNATES MD-TyE VERTIC~,L ............ '.' ~F~H' THE CALCULATION PR CCEDU.~ ES USE A LINEAR INTERPOL~tTZON RFTWEEN THE NEAREST 20 FOOT MD (FROP RADTUS OF' CURYATURE) FOINTS OCTO~.,,r.R 3~, 197~ ,JOB IuUMRER ROSS-16322 'KELLY BUSHING ELEV. = 64,29 FT. TRUE SUB-SEA TOTAL FEASLI~ED VERTICAL VERTICAL RECTANGULAR £OORDIN~TES ~ ~ ~"5 '""'::: ~:i"~~' ~ 3380 3793 5633._ ~09~ 6500 ~.716 337~.95 331.0.66 GO,G1 S 3772.58 370P,, 29 148.5;:> S 1311.~6 S 1532.06 S ' ~8,86 S 560G.~8 5q13.0C 58-'IP,. 71 6075.61 6011.32 73'1 7~57,3g :'' 75e ~21~-38 ~601.18 8610.62 85~6.33 9~93 10011 10C24 3367.51 S 3375.54 S 0306 ' "~81:',~:'"' ~q 9" ~752,G0 2275,58 E 9,5/8 SHOE 22'79.51 E S/l~ R IVE'R S F tH! O-BP aLAsKA .,. ,... ,i':'i'i i ~.~" i..i~'i i ii,.i:..:i, i :i UFLL B-!O CO~'~PUTA~ DP UP..'HO E BAY OCTOBER /~L ASK,~ ION DATE 30,~ 1978 ,JOB NUMBER BOSS-16322 PAGE' ~E/~SURED FFPYH 2~ lC~78 .KELLY BUSHING ELEV. = 64.29 FT. TRUE SUB-SE~. TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES · ~'~'". ..... ' ~'~.~?~'.,,'~ ~'~i~i~iiii!!!i:;~!!:~::'!~ :~:~:?~'~..:~i~;~i:ii~!! 51~iii!.i: :'.".: .. ~bi-4"; ~0 ............ .......... 895o' ,'".~;""'"':'"'"'"'",l '" :'""'~"7~ 0 ;'~ ';""S''''''' ......... ................ "~ ............ ............... ' ............... '"' ~' 1[,'.653 9051.71 8987°42 3753.51 S 2~62o29 ~ OIL/WATER CONThCT 1~67 4288.11 9223.R2 3966.61 S 2563.5~; F ZONE lB 9.~57o29 9293°00 A329.39 K 9382.01 9317.72 4951,,,81 S . 2603°73 5 7 INo SHOE 4382.01 931.7.72 4051.~1 $ 2Gt~3°7Z E TD {DRILLER) 11027 11~50 ~I1057 1~065 11100 111@0 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION 3111 'C"'STR EET ANCHORAGE, A L AS K ~_-.:~?'- TELEPHONE (907) 2~- Pouch ~CHOR~E. State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Hoyle Hamilton Director Gentlemen: Well B-10 (11-05-10-14) Enclosed, in duplicate, is form P-4, Monthly Report of Drilling and Workover Operations, for the above-named well for the month of October, 1978. ,. Very truly yours, SOHIO PETRO~ COMPANY District Drilling Engineer PRJ: ja Enclosures cc: Well File #17 RECEIVED NOV.;. ? and Gas Form No. 10404 REV. 3-1-70 SUBMIT 1N DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. AP! NUMERICAL CODE 50-029-20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 WELL WELL OTtlER 2.NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Sohio Petroleum.~y, Div. Sohio Natural Resources Co. Prudhoe Bay Unit 3. ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, Alaska 99502 B-10 (11-05-10-14) 4. LOCATION OF WELL At surface: 1611' WEL, 2070' SNL, Sec. 31, TllN, R14E, UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, UPM 12. PERMIT NO. 78-54 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. October, 1978 Directionallydrilled 12 1/4" hole to 10019'. Ran open hole logs. Ran 257 its. 95/8" 47# L-80 Buttress casing to 10011'. Cemented in tw~ stages: First stage with 1440 cu.ft. Class G cement, second stage through DVat 2306' with 357 cu.ft. Permafrost cement. Arctic Packed 9 5/8" x 13 3/8" annulus. Tested casing to 3000 psi, okay. Cleaned outanddrilled to 10050', performed leak-off test to 0.64 psi/ft. gradient. Drilled 8 1/2" hole to 11100'. Ran open hole logs. Ran 38 its. 7" 29# 5-80 Buttress casing to 11100' with PBRtop at 9493'. Cemented with 335 cu.ft. Class G cement. Cleaned outto 11057'. Tested 7" x 9 5/8" lap, no good. ~Squeezed l_~Rwith 180 cu.ft. Class G cement. Tested lap, okay. Displaced well to CaC12.~-~-~ ~e~f~' ~fi~ ~s~' ~ 7~ li~er ~, no inflow. Ran 240 its. 7" 26# 5-80 AB-IJ-4S tubing to PBR at 9493'. Displaced tubing to diesel, landed tubing with ball valve nipple at 1999'. Tested tubing to 3500 psi. Installed and tested tree. Released rig 1400 hours, 10/24/78. RECEIVED NOV,- ? lg/0 TITLE District Drilling NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Hoyle Hamilton Director 3111 "C" STREET ANCHORAGE, ALASK TELEPHONE (907) 265-0 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 9 October 5, 1978 Gentlemen: Well No, B-10 (1!-~05-10-14) ~ Enclosed, in duplicate, is form P-4, Monthly Report of Drilling and Workover Operations, for the above-named well for the month of September, 1978. Very truly yours, SOHIO PETROLEUM COMPANY P. R. Judd District Drilling Engineer PRJ:ja Enclosures cc: Well File #17 RECEIVED Drlg. Permit No.~_'-~l,~ Operator .S~! ~-~ ~'? A1 ' a Oil and Gas Conservation Commi 'e Field Inspection Report Wel 1/P1 atfm SecL~_]T/Ot~/.Rl~'~: ' Represented bY~O~4~_i.~.l.~..~.!O Name & Numberr/'~'''/~ Satisfactory T:y~p'e Inspection Yes No Item [.~) Location,General () (x) () (X) () () () () () 1. Well Sign 2. General Housekeepin.Q ~. Reserve Pit-(~<)open( )filled (X) ( ) 17 4. Rig (~) ( ) 18 ( ) Safety Valve Tests 5. Surface-No. Wells 6. Subsurface-No. Wells ( ) Well Test Data ( ) ( ) 7. Well Nos. , , ( ) ( ) 8. Hrs. obser__, ,__ () () 9. BS&W , , , Satisfactory Type Inspection Yes No Item (~) BOPE Tests (Z~) ( ) .15./'j~.~Casinq set 0~L7~ (A'): ( ) 16 Tes----~L fluid-(~}wt~( )mud ( ) oil Master Hyd. Control Sys.-~i~) psiQ ~'!2 btls ~,_~~._~,~:psi.q (~ ( ) 19 Remote Controls (~ ( ) 20 DrillinQ spool-__~"~"outlets (X) ( ) 21 Kill Line-(/~') Check valve (~) ( ) 22 Choke Flowline (,~') HCR valve !~ ( ) 23 Choke Manifold No. valvs~/Li[lClS~ ( ) 24 Chokes-(,V)Remote( )Pos.(~]Adj'] (~) ( ) 25 Test Plu.o-(~')Wellhd( )CSQ( )none ( ) ( ) 10. Gr. Bbls. , , , (z~) ( ) 26 Annular Preventer:~l~_~si.Q ( ) FinaT Aba~m[n't (,\) ( ) 27 Blind Rams ~4e Op. s]q ( ) ( ) ll. P&A Marker (~ ( ) 28 Pipe Rams £~siq ( ) ( ) lZ. Water well-( )capped( )plugged (-~ ( ) 29 Kelly & Kelly-cock_~m~ psig ( ) ( ) 13. Clean-up (~ ( ) 30. Lower Kelly valve ~t~__psim ( ) ( ) 14. Pad leveled ~.~/..~ (~') ( ) 31. Safety Floor valv~L~BV '(~v)Dart Total inspection observation time~ ~ [~r_~.l/days Total number leaks and/or equiP, failures Remarks .S'/~A~'~ ~~ ~'~- '~A~:z~ ~.zl~C_o_ j.~w~,;~-,~ ,~4~t.~z 'T_,,,.¢ _~,.,"~ :fm,~A,i~2,--.~C")'iz~'-'r--' / ......... cc-.._/__t/lC/S'],.'.F~,)i Notif~ in---'--.da, ys-orFwhen ready---- Inspected by~l~/l,:.~.._$_.__Date Form No. 10404 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA~ OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 1. 7. IF INDIAN'ALOTTEE OR TRIBE NAME OIL GAS WELL WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Company, Div. Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR PouCh 6-612~ Anchorage~ Al_aska 99502 4. LOCATION OF WELL At surface: 1611' WEL, 2070' SNL, Sec. 31, TllN, R14E, UPM 8. UNITFARMORLEASENAME Prudhoe Bay Unit 9. WELL NO. B-10 (11-05-10-14) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 05, T10N, R14E, UPM 12. PERMIT NO. 78-54 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. ~gptember, 1978 Spud well 0600 hours, 9/20/78. Drilled 17 1/2" hole to 2690'. Ran 70 its. 13 3/8" 72# controlled-yield N-80 Buttress casing to 2675'. Cemented with 4464 cu.ft. Permafrost II cement. Performed 3 top jobs with 1500 cu.ft. Permafrost II cement. Installed and tested BOPE. Cleaned out to 2704', ran leak-off test. Directionally drilled 12 1/4" hole to 8176'. RECEIVED ~ and Gas Cmmervation Anchorage 14. I hereby certify~t~l~ foregj~ing is true and correct NOTE-Report on th~s form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. H. Hamil~m ~ Di~ · Segtsmber 29, 1978 witness BOP Test, Sohio Well No. B-10 Sec. 5, TION, R14E, UPM. Permit No. 78-25 ~., ~~.~,~..1978 - I left Arco' s Drill Site 7 to Sohio H~ ~'at~B-lO Wall' at- 3:0~~ ~, azriv/ng at B-10 at 3:30 PM. Purpose of t~ was to witness BOP test for-Sohio-~P. I had just witnessed 7-5 .~~W~. I arri~ (~ Drill Site f~r Sohio BP, top job ~ ~ up ~'s ~s ~ bY 4:00 PM. T~e first ~ w~re the b!!r~t rams to 5000 p~. ~,~ mm ~ ~ ~~~ 50~i. ~~~~~ ~~~~ ~ ~ 50~ ~i. ~~~~ ~~~ 3~-0~i. ~ ~pi~ ~e~~~ 6 ~~ ~ ~ ~ ~t~ ~~ ~ 5000 50~ ~i. ~~~~ ~ ~t~~ ~y. ~ ~~~~y~~~~-~00 ~ ~~ly. ~ ~~r ~ ~ ~ 3000 ~, ~ ~fo~ ~ ~ ~00 ~. ~ ~~ ~ ~ 2~, 2s00, 2500 ~ 2500 ~i ~. ~ of ~. ~pit~~~t~~~. ~ ~i~ ~g~ ~ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 3111 'C" STREET = __ .......... ANCHORAGE, ALASKi~- I'C, O~OL IR I ' ~ ~ ENO ANChORAgE ALASKA ~,tSO~ ~ _' ...... September 15 19 ]-8' ...... · ...... ,"-,~'c~,-~t'~{ ,... Attention: Mr. Hoyle Hamilton Director Gentlemen: Well B-10 (11-05-10-14) Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells for the above-named well. This report contains our proposal to change the completion program. Very truly yours, SOHIO PETROLEUM COMPANY p.~~ District Drilling Engineer PRJ: j a Enclosures cc: Well File #17 Form 10.403 ,~REV. 1-10-73 Submit "i ntentlons" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE CONFIbL ,aL SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. OIL I~ GAS r'-I WELL I..~.J WELL OTHER 2. NAME OF OPERATOR · ~Sohio Petrpleum Co~paBy,~, Div: of Sohio Natur. al...R.e.s.ources ,C 3. ADDRESS OF OPERATOR ;Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL At surface 1611' WEL, 2070' SNL, Sec. 31, TllN, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 65' AMSL est. 14. Check Appropriate Box TO Indicate Nature of Notice, Re 5~ APl NUMERICAL CODE 50-029-20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE'NAME ~,,.Prudhoe Bay Unit 9. WELL NO. B-10 (11-05-10-14) 10. FIELD AND POOL, OR WILDCAT' Prudhoe Bay,Prudhoe Oil Pool 11. SEC., '1~., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 05, TiON, R14E, U?M 12. PERMIT NO. 78-54 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER 5HUT-OFF FRACTURE TREAT SHOOT OR AClDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF [~ REPAIRING WELL FRACTURE TREATMENTH ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. We propose to change the;completion program of this well as follows': . mi Set 9 5/8" 47# L-80 casing at 8535' TVD (9894' MD). Cement with 1423 cu.ft. Class G cement)and 360 cu.ft. Permafrost C placed through DV collar at 2300' MD. Drill 8 1/2" hole to T.D. 9300' TVD (10,875' MD). Bi Set 7" 29# L-80 liner at 9300' TVD (10,875' MD); top at 8145' TVD (9394' MD). Cement with 260 cu.ft. Class G cement.* . Complete the well with 7" tubing by stabbing a seal assembly into a PBR placed on top of the 7" liner. RECEIVED SIGNED ~. ~'. '" P. R .... Jud~ - TITLE District Drlg. Engineer DATE (This space for State office use) PETROLEUM ENGINEER See Instructions On Reverse Side DATE SEPT. ,..Jg;.. 1978 .~ 1978 99502 DeparU~nt of Fish ~ ~m~. Pollu~/~-of any waters of the Sta%e i~ ~fted by ~S 46, Chapter 03, Article 7 ~ ~he regula~ p~ted there~ (Title 18, Alaska ~~ ~, ~ 70) amt by the ~ Water Pollution ~t to 2~ 38.40, Local Hire ~ State Leases, tt~ Alaska ~t of Labor is being notified of the issuance of this pezmit to drill. notified so that a representative of the Divisic~ may be ~ to witness test~ of blo~t pze~enter equ~t befoxe surface casing shoe is drilled. P.R.~ -2- P. B. Unit B-10 July 12, 1978 mea~am~ of Fisa a.~ ~, ~a~t~at Sec~.~_~n w/o e,cl. ~par~ent of ~~al Oa~ezva~ w/o eric1. ~ of ~, Bu~ervisor, ~ Law Ocmplianoe Dx'~.sion w/o ~. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 3111 "C" STRI~ETi ANCHORAGE, AI~ASKA;:' TELEPHONE (907)~65-,0000--, MAIL: POUCH ~-61~ ANCHORAGE, ALA~A 99502 Attention: Mr. O. K. Gilbreth Director Gentlemen: Well B-10 (11-05-10-14) Enclosed are the following documents: 1. Application for Permit to Drill 2. Proposed Drilling Program Outline Be . Our check for $100.00 to cover the permit filing fee L'"I Three copies of surveyor's plat showing weii location. JU/~! &'vis/o, oi Oil ,~n~..t Very truly yours, Anchora~,~ SOHIO PETROLEUM COMPANY ~ District Drilling Engineer PRJ:ja Enclosures cc: Well File #17 ,~ SUBMIT IN TRL~"%TE Form 10-401 REV. 1-1-71 (Other in~truc: n reveme sid ~ la. TYPEOF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DRILL [] DEEPEN [--] b. TYPE OF WELL OIL ~-~ GAS SINGLE MULTIPLE 2. NAME OF OPERATOR Sohio Petroleum Company, Div. of Sohio Natural Resources Co. 3. ADDRE3S OF OPERATOR Pouch 6-612, Anchorage, Alaska. 99504 4. LOCATION OF WELL At surface 1611' WEL, 2070' SNL, Sec. 31, TllN, R14E, UPM At proposed prod. zone 880' EWL, 300' SNL, Sec. 5, T10N, R14E, UPM 13. DISTANCE IN MILES AND DI~ON FROM NEAREST TOWN OR POST OFFICE* 10 miles NW of Deadhorse E:ONFI[IENTIAL No. 50-029-20321 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. Hr INDIAN, ALLOTYEE OR TRIBE NAME 8. L.~IT FAILM OR LEASE SAblE Prudhoe Bay Unit '9. ~'ELL NO. B-10 (11-05-10-14) 10. mELD .~D POOL OR ~lrDCAT Prudhoe Bay,Prudhoe 0tl Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJE~ Sec. 5, T10N, R14E, UPM IZ 14. BOND INFORMATION: rn'E Blanket 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest drig, unit, if any) 300' S of Lease 28310 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. .271..1' .qw nF W~11. R-? .. 21. ELEVATIONS (Show whether DF, RT, CR, etc.) American Insurance Co. 3348616 1 16. No. OF ACRES IN LEASE 2501 19. PRoPOsED DEPTH . MD TVD 10875' 9300' KBE = 65' AMSL est. 23. PROPOSED CASING AND CEMENTING PROGRAM ~n, $100,000.00 17. NO.~.CRES A~SIGNED TO THIS WELL 160 20. ROT~Y OR CABLE TOO~ .R0ta~y :Z ~PRO~DATEWORK~LLSTART .August 25, 1978 SIZE .O.F HOLE SIZE OF. CASING., W~iG~ PER FOOT GRADE- MD 'S~-rrINO'DE?THTV[ -- O~.t~., of ~e~,~t ............... .'.'.. 36.'~ ' I 0" 0" · 3 X2.. Im, ulated Condm~tor. 110' 110' 275 cu. ft.. ... .. 3 8" 2670 5000 cu. ft. 17~, 13 /. . . 72# N-SO 2670' ' .12~" 9 5/8" ,. .47# .. N-80 8600' 7500' ,. q ~/R" 47# Soo-q5 1.0875' q300' 1~ 1608 e,~.fr. 2~ q6?'m,_Fr_ . , , See attached drilling program. RECEIVED JUN 3 0 1978 IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on. present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on subsurface locations and me,sm-ed a~d true [~ verj/c~depths. Give blowout preventer program. 24'" hereby ?~lf%l~eg°J~',i$ TN~e and C°"ect ~ ~/~., - ~: ~_ .T~.:3~.- ?._'be.."- ' ' (Th~ spac~ for State office use) CONDITIONS OF APPROVAL,IF ANY: SAMPLES AND CORE CHIPS REQUIRED OYES [~,NO DIRECTIONAL SURVEY REQUIRED [~s [] No MUD LOG [] YEs C~N0 PERMIT NO. 78-54 IOTHER REQUIREMENTS: A.P.I. NUMERICAL CODE TITLE District Drlg. Engineer , 50-029-20321 APPROVALDATE July 12, 197~ APPOVED BY TITLE Chairman Instruction On Reverse Side DATE July 12, 1978 PROPOSED DRILLING AND COMPLETION PROGRAM Dry bucket 36" hole to 80 ft. below a ground level and cement 30" x 20" insulated conductor to surface using Permafrost II cement. Drill 17 1/2" hole to 2670' and cement 13 3/8" 72# controlled-yield N-80 BUttress casing to surface using 5000 cu.ft. Permafrost II cement. Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Directionally drill 12 1/4" hole to 9300'± TVD. Run 9 5/8" 47# controlled-yield N-80 and Soo-95 Buttress casing to 9300' TVD and cement first stage with 1608 cu.ft, cement. Cement second stage through D.V. collar at 2300' with 362 cu.ft. Permafrost II cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus being displaced to Arctic Pack through a "FO" cementer placed at 2050'. Run 7" 26# controlled-yield N-80 Atlas Bradford IJ-4S tubing with a production packer assembly at 8529'± TVD. A subsurface safety valve with dual control lines will be placed at 2000'±. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. I0 ~0 SO 40 4,9';'1.85 OI 02 rO ~ 3~ 05 , 04 ....... 4.,~3.8.~'- - . ...... O! O~ LAT.= 70 05 LO N ~. = I ~ 8° 40* 2q.~2= X = 664~C 58 Y = 5,948,471 04 o; ~-~ ~'/~ J PORTION OF T II N, R 14E, UM SCALE I" -- I/2 MILE CERTIFICATE OF SURVEYOR I HEREBY CERTIFY THAT I AM PROP'".ELY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A REVISION SURVEY COMPUTATION MADE BY ME OR UNDER MY SUPER- VISION, AND THAT ALL DIMENSIONS AND OTHER DETAILS OF THIS REVISION ARE CORRECT. · THIS PLAT IS A REVISION OF A SURVEY PLAT SIGNED AND SEALED BY ANDREW F. POTTS NO. $514-S. THE PERTINENT DETAIL OF THAT PLAT HAVE BEEN INCLUDED HEREON AND THE BELOW REVISION DATA HAS BEEN ADDED. DATE SURVEYOR JSUMP 'o _ J_ $$7' -I kl35' = PAD DETAIL. SCALE: REVISED PROPOSED B-lO BOTTOM HOLE LOCATION 6/21/78 C.L.F. REVISED PROPOSED BOTTOM HOLE LOCATION 6/10/78 C.L.F. PAD "B" EXTENSION LOCATED 'IN NE !/4 PROTRACTED SEC. $1,TIIN, RI4E, U.M., ALASKA COMPUTED FOR SOHIO PETROLEUM CO. II COMPUTED BY ARCTIC SURVEYING, IO20 WEST INTERNATIONAL AIRPORT ROAD ANCHORAGE, ALASKA g950~ INC. CHECK LIST NOR ~-~9 WET,T, PEP~ITS Cc~npan.¥ Yes No Remarks 1. Is the pe_rmit fee attached ..................... /~4~ _: 2. Is well t<., i-~ !ccated in a defined pool .............. /~3K 3. Is a re ...... ~_~_d s~%rvey plat attached 4. Is well ~,'~-atcd proper distance from property line ......... ~ 5. Is well locah~w/ proper distance from., other wells .......... ~f 6. Is sufficient undedicated acreage available in this pool ...... ~ 7. Is well to !-~ deviated ....................... //~ 8.~ ~s operator the only affected party ............... i. Can permit be approved before ten-day wait ............. Does operator have a bond in force .................. .1. Is a conservation order needed ................... :2. Is administrative approval needed ......... . ........ _ _,. //~g~ Item Approve Date -(1) Fee · (2) Loc. (3) Admin. /-~ t3. Is conductor string provided ' [4. Is enough cement used to circulate on conductor and surface .... [5. Will cement tie in surface and intermediate or production s~rings . .'ill cement cover all known productive horizons ........... [?. Will surface casing protect fresh water zones ........... [8. Will all c~sing give adequate safe~y in collapse, tension & burst . ~_~ L9. Does BOPE have sufficient pressure rating - Test to ~0 0 psig . A~,~9. · ~0. Has DMEM ~pproved Plan of Operation ................ ~ %dditional Re~.~iroments: -(5) P~DPE ~ 2-//- 7Z - (6) Plan ~_/~z; ~-IIr?,$ Approval Rec~nded: ~o!~: ~g~eering: ~sed 4/14/78 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is.accumulated at the' end of the file under APPENDIX.' ,o No special'effort has been made to chronologically organize this category of information. · o )953 Run 1: 05 - November - 1993 CNIGR Cased Hole ~0441 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD B - 10 500292032100 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 02-DEC-93 4468.02 R. IORIO C. SEVCIK 31 llN 14E 2070 1161 64.29 37.24 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: RUNNUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 13.375 2675.0 72.00 9.625 10011.0 47.00 7.000 11100.0 29.00 4.500 10344.0 12.60 BASELINE DEPTH 9953.0 9990.0 10016.5 10017.0 10018.0 10019.0 10020.0 10021.5 10022.0 10022.5 10031.0 10033.5 10034.0 GRCH 9953.0 9989.5 10017.5 10018.0 10018.5 10019.5 10020.0 10021.5 10022.5 10023.0 10032.5 10035.0 10036.0 EQUIVALENT UNSHIFTED DEPTH ......... BHCS GR 2 1 20-SEP-78 SCHLUMBERGER WIRELINE SERVICES 10055.0 10056.0 10056.5 10057.0 10061.5 10067.0 10080.0 10081.0 10083.0 10084.0 10085.5 10086.5 10087.0 10102.0 10103.0 10103.5 10107.0 10108. O, 10116.5 10117.0 10120.0 10121.0 10129.5 10130.5 10133.0 10134.0 10135.0 10171.0 10171.5 10178.0 10178.5 10186.5 10188.0 10262.5 10265.0 10266.0 10269.0 10270.5 10272.5 10275.5 10279.0 10282.5 10286.0 10288.0 10303.0 10321.5 10329.5 10351.5 10353.5 10354.0 10360.0 10360.5 10364.0 10366.0 10370.0 10384.0 10393.0 10393.5 10441.0 $ 10057.0 10057.5 10058.0 10059.0 10063.0 10069.0 10080.0 10080.5 10082.5 10083.0 10084.5 10085.0 10085.5 10100.0 10101.0 10102.0 10105.5 10106.0 10114.5 10115.5 10118.5 10119.0 10127.5 10128.0 10130.5 10131.0 10131.5 10172.5 10173.0 10177.0 10177.5 10184.5 10186.0 10263.5 10267.0 10268.0 10271.5 10273.0 10275.0 10278.0 10282.0 10285.0 10289.0 10290.5 10305.0 10322.0 10329.5 10352.5 10354.5 10355.5 10361.5 10362.5 10366.0 10369.0 10373.0 10387.5 10396.5 10397.0 10441.0 REMARKS CN/GR CASED HOLE. LOG TIED INTO CN-DEN LOG RUN 15-OCT-78. CN LOGGING PARAMETERS: LIMESTONE MATRIX CHISM OFF CALIPER CORRECTION = 10.625" CASING CORRECTIONS OFF SALINITY = 0 PPM. WELL SHUT-IN BEFORE LOG. PUMP-IN 150 BBLS. SW (WITH METHANOL CAP) REQUIRED BEFORE LOGGING. GAMMA RAY INDICATED SCALE BUILD-UP IN WELL. PRODUCTION RATES (10-OCT-93): OIL = 1.70 MBPOD WATER = 0.33 MBWPD GAS = 9.42 MMSCFD CHOKE = 95.8 MANIFOLD PRESS.= 246 PSIG @ 130 DEGF WATER CUT = 16.3% GOR = 5540 SCF/STB NO LIFT GAS. OPEN HOLE GAMMA RAY DOWNLOADED 15-NOV-93 FROM THE BP EXPLORATION UPS/CSS COMPUTER SYSTEM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY o 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: i START DEPTH STOP DEPTH 9964.0 10392.0 9976.0 10401.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... (MEASURED DEPTH) BASELINE DEPTH NPHI 9953.0 9953.0 10019.5 10021.0 10020.5 10022.0 10023.0 10022.5 10023.5 10023.0 10024.0 10024.5 10026.5 10027.0 10063.5 10064.5 10064.5 10065.5 10065.0 10066.5 10066.0 10067.5 10080.0 10080.5 10080.5 10081.0 10081.5 10081.5 10083.0 10082.0 10085.0 10084.0 10086.0 10084.5 10087.0 10085.5 10087.5 10086.5 10089.0 10088.0 10100.5 10099.0 10104.0 10102.5 10113.0 10114.5 10115.0 10116.0 10116.5 10117.5 10117.5 10118.0 10118.5 10119.0 10119.5 10119.5 10121.5 10121.5 10128.5 10126.0 10130.0 10127.5 10131.0 10128.0 10133.5 10130.5 10154.5 10152.5 10155.0 10153.5 10158.5 10157.0 10167.0 10166.5 10175.5 10175.0 10176.5 10175.5 10177.0 10181.0 10187.5 1019O.5 10194.5 10195.0 10197.0 10198.0 10218.0 10226.5 10232.5 10235.0 10236.0 10236.5 10257.0 10257.5 10269.5 10270.0 10271.0 10315.5 10319.0 10336.0 10369.0 10370.0 10371.0 10372.0 10372.5 10393.5 10403.5 10404'.5 10432.0 10432.5 10441.0 $ REMARKS: 10176.0 10179.0 10185.5 10188.0 10192.0 10193.5 10195.5 10197.5 10217.5 10227.0 10231.5 10234.0 10234.5 10235.0 10258.0 10258.5 10273.0 10273.5 10274.0 10317.0 10321.0 10336.0 10372.0 10372.5 10373.5 10374.0 10374.5 10393.0 10405.0 10408.0 10435.5 10436.0 10441.0 PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH2 · OUT $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB * DATA RECORD (TYPE# 0) Total Data Records: 24 4 4 86 720 65 4 4 86 720 65 4 4 86 720 65 4 4 86 720 65 4 4 86 720 65 2O 1014 BYTES * Tape File Start Depth = 10441.000000 Tape File End Depth = 9953.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5863 datums Tape Subfile: 2 284 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i START DEPTH STOP DEPTH 9984.0 10393.0 9984.0 10401.0 BASELINE DEPTH 9953.0 10017.5 10018.0 10018.5 10020.5 10022.5 10023.0 10023.5 10025.0 10025.5 10028.0 10030.5 10035.5 10036.0 10036.5 10037.5 10059.0 10061.5 10064.0 10067.5 10080.0 10081.0 10082.0 10083.0 10083.5 10084.5 10085.0 10085.5 10086.0 10086.5 10087.5 10088.0 10088.5 10089.0 10097.5 10098.5 10100.5 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH 9953.0 10017.0 10017.5 10019.5 10024.0 10032.5 10037.5 10038.5 10039.0 10039.5 10060.5 10063.5 10066.0 10070.0 10085.5 10086.0 10086.5 10089.0 10097.0 NPHI 9953.0 10020.0 10023.0 10023.5 10024.0 10025.5 10026.5 10029.0 10036.5 10061.0 10082.0 10082.5 10083.0 10083.5 10084.0 10084.5 10085.0 10085.5 10086.0 10086.5 10087.5 10088.0 10097.5 10099.5 10102. 10102. 10103. 10103. 10104. 10105. 10108. 10110. 10112. 10119. 10120. 10120. 10121. 10121. 10129. 10132. 10133. 10133. 10134. 10134. 10135. 10168. 10171. 10174. 10175. 10176. 10177. 10178. 10178. 10181. 10193. 10193. 10194. 10195. 10197. 10197. 10198. 10198. 10200. 10221. 10226. 10227. 10228. 10228. 10232. 10232. 10233. 10233. 10234. 10235. 10235. 10236. 10236. 10243. 10243. 10244. 10247. 10247. 10248. 10249. 0 5 0 5 0 5 5 5 5 0 0 5 0 5 5 0 0 5 0 5 0 5 5 5 5 0 0 0 5 0 0 5 5 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5~ 5 0 5 0 5 0 5 0 0 5 0 0 10112.0 10118.5 10119.0 10131.0 10131.5 10132.0 10132.5 10133.0 10172.0 10174.5 10176.0 10178.5 10179.0 10196.5 10198.0 10228.5 10229.5 10230.0 10244.5 10248.0 10249.0 10249.5 10250.0 10100.O 10101.0 101O1.5 10102.5 10103.0 10105.5 10110.0 10113.0 10116.0 10120.5 10122.0 10123.0 10123.5 10128.5 10133.0 10173.0 10176.5 10177.0 10177.5 10180.0 10192.0 10193.0 10194.0 10194.5 10196.5 10197.5 10199.5 10222.0 10228.0 10232.5 10233.0 10234.0 10234.5 10235.0 10235.5 10236.5 10237.0 10238.0 10244.5 10245.0 10249.5 10258.0 10259.5 10260.0 10262.0 10267.5 10269.5 10270.0 10270.5 10271.5 10272.5 10275.0 10279.0 10281.0 10282.5 10286.0 10290.5 10291.5 10292.0 10293.5 10299.5 10300.5 10301.5 10303.5 10305.0 10306.5 10307.5 10310.5 10312.5 10319.0 10320.0 10321.0 10325.0 10328.5 10332.0 10333.0 10334.0 10335.5 10336.0 10336.5 10339.5 10342.0 10344.5 10346.5 10348.5 10350.0 10350.5 10353.5 10354.0 10364.0 10367.5 10368.0 10384.0 10385.0 10387.5 10389.5 10393.0 10393.5 10394.0 10403.0 10250.5 10259.5 10261.0 10262.0 10263.5 10269.5 10272.0 10272.5 10274.0 10275.0 10275.5 10278.0 10282.0 10284.0 10285.5 10289.0 10293.5 10294.0 10294.5 10295.5 10302.5 10306.0 10309.0 10309.5 10312.5 10320.5 10321.5 10322.0 10326.0 10329.0 10332.0 10334.0 10336.5 10342.5 10344.0 10348.0 10349.5 10351.0 10352.0 10355.0 10356.0 10366.0 10371.0 10371.5 10386.5 10388.5 10391.0 10392.5 10395.5 10396.0 10299.0 10301.5 10306.5 10316.0 10322.0 10332.0 10334.5 10335.5 10339.0 10394.5 10403.5 10403.5 10441.0 REMA~S: 10404.0 10441.0 10441.0 PASS 2. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. / ? ?MATCH3. OUT /??MATCH4. OUT $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FOPd~AT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units i GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 I CPS 4 NUCT 2418 68 i CPS 5 TENS 2418 68 1 LB * DATA RECORD (TYPES 0) Total Data Records: 24 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 mmmmmmm ~0 1014 BYTES * Tape File Start Depth = 10441.000000 Tape File End Depth = 9953.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5863 datums Tape Subfile: 3 Minimum record length: Maximum record length: 217 records... 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9971.0 10393.0 9984.0 10401.0 BASELINE DEPTH 9953.0 9991.0 9994.5 10017.5 10019.5 10020.0 10020.5 10021.0 10022.5 10027.5 10028.0 10031.5 10037.0 10O55.O 10055.5 10056.5 10057.0 10057.5 10058.5 10061.0 10061.5 10063.0 10063.5 10070.5 10080.5 10082.0 10083.0 10083.5 10084.0 10085.0 10085.5 10086.0 10086.5 10087.5 10088.0 10099.5 10100.0 GRCH 9953.0 9991.0 9994.5 10019.0 10021.0 10021 10022 .5 .0 10028.5 10033.5 10039.0 10057.5 10058.0 10058.5 10059.0 10060.0 10063.0 10063.5 10084.5 10085.0 10085.5 10086.0 10087.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... NPHI 9953.0 10022.5 10023.0 10023.5 10029.0 10060.0 10064.5 10065.5 10072.5 10082.5 10083.0 10083.5 10084.5 10085.0 10085.5 10086.0 10087.5 10099.5 10100.0 10102°0 10103.0 10103.5 10104.5 10106.0 10112.0 10113.0 10115.0 10117.5 10118.5 10119.0 10120.0 10122.0 10123.0 10123.5 10124.0 10125.0 10129.5 10130.5 10131.0 10131.5 10132.0 10133.5 10134.0 lO14g.5 10153.5 10154.5 10157.0 10169.0 10171.5 10173.0 10175.0 10176.0 10177.0 10177.5 10179.5 10193.5 10194.5 10195.5 10196.5 10197.5 10198.5 10199.0 10222.5 10227.5 10228.5 10243.5 10244.5 10246.0 10258.0 10258.5 10268.0 10269.5 10270.0 10270.5 10271.0 10272.0 10277.0 10279.0 10282.5 10103.0 10122.5 10123.5 10124.0 10124.5 10130.0 10130.5 10133.0 10172.0 10174.5 10176.0 10178.5 10179.0 10179.5 10223.5 10228.5 10230.5 10245.5 10246.0 10259.5 10260.5 10270.0 10274.0 10274.5 10275.0 10282.5 10285.5 10100.5 10101.0 10104.0 10105.0 10108.0 10113.0 10116.5 10118.0 10120.0 10120.5 10121.0 10121.5 10123.5 10128.5 10130.0 10130.5 10132.0 10149.5 10153.5 10154.0 10156.5 10174.0 10177.0 10177.5 10194.0 10194.5 10195.0 10196.0 10196.5 10197.5 10198.5 10247.5 10273.0 10273.5 10274.0 10280.0 10285.5 10289.0 10291.0 10294.0 10292.0 10294.5 10294.0 10296,5 10295.0 10297.0 10295.5 10297.5 10297.5 10300.0 10299.5 10309.5 10312.0 10310.5 10312.5 10311.5 10313.5 10312.5 10317.0 10318.5 10317.5 10319.0 10318.0 10320.0 10319.0 10319.5 10321.5 10320.5 10322.0 10325.5 10327.0 10327.5 10328.5 10328.5 10329.0 10330.0 10330.0 10330.5 10335.0 10336.0 10336.5 10337.0 10337-5 10338.5 10339.0 10344.5 10345.0 10350.0 10351.5 10350.5 10352.5 10353.0 10355.0 10354.0 10355.5 10354.5 10356.5 10362.0 10364.0 10362.5 10365.0 10363.0 10365.5 10369.0 10372.5 10391.0 10394.0 10392.0 10395.0 10392.5 10395.5 10441.0 10441.0 $ REMARKS: PASS FUCT, 10303.5 10315.0 10323.5 10330.5 10336.0 10336.5 10337.0 10338.0 10338.5 10339.0 10339.5 10441.0 . NUCT, & TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH5. OUT /??MATCH6. OUT $ : BP EXPLORATION :B-10 : PRUDHOE BAY : NORTH SLOPE : ALASKA " * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME TaPe depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 i CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 2O * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 24 Tape File Start Depth = 10441.000000 Tape File End Depth = 9953.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11726 datums Tape Subfile: 4 199 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9960.0 10393.0 9973.0 10401.0 BASELINE DEPTH GRCH 9953.0 9953.0 9970.0 9978.0 9985.0 9984.0 9987.0 9986.0 9995.0 10018.0 10019.0 10023.0 10027.5 10037.0 10038.0 10037.5 10039.0 10038.0 10039.5 10053.5 10056.0 10054.5 10057.0 10055.5 10057.5 10056.5 10058.0 10060.5 10067.5 10069.0 10082.0 10085.5 10083.0 10086.5 10084.5 10087.0 10085.0 10085.5 10087.5 10086.0 10088.0 10087.0 10088.5 10094.0 10100.0 10101.0 10102.5 10106.0 10111.5 10112.5 10111.5 10115.0 10116.0 10117.0 10118.0 10119.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... NPHI 9953.0 9967.0 9975.0 9998.0 10023.0 10028.0 10061.5 10084.0 10084.5 10085.0 10087.5 10094.5 10100.0 10103.5 10104.5 10107.0 10112.5 10117.5 10118.5 10119.0 10120.0 10120.5 10120.0 10120.5 10121.5 10122.0 10124.0 10125.0 10127.5 10128.0 10129.0 10132.0 10133.0 10134.0 10139.5 10151.5 10152.0 10153.5 10154.5 10160.5 10165.0 10165.5 10166.0 10167.0 10168.0 10171.5 10173.5 10174.5 10176.5 10178.5 10193.5 10194.5 10195.5 10198.5 10199.5 10200.0 10204.0 10232.0 10234.0 10235.0 10237.0 10237.5 10246.5 10247.0 10248.0 10248.5 10258.0 10264.5 10269.5 10270.5 10272.0 10272.5 10275.5 10276.0 10279.0 10283.5 10284.5 10307.5 10308.5 10310.5 10311.5 10315.0 10123.0 10123.5 10130.5 10131.0 10132.0 10155.0 10167.0 10167.5 10168.5 10169.5 10170.0 10174.0 10176.5 10178.0 10194.5 10198.5 10199.5 10203.5 10248.0 10248.5 10249.0 10249.5 10259.5 10271.0 10272.5 10274.0 10275.0 10277.0 10281.5 10286.0 10286.5 10309.5 10310.0 10312.0 10312.5 10121.0 10121.5 10122.0 10122.5 10126.0 10126.5 10127.0 10137.5 10150.5 10151.0 10153.0 10160.0 10174.0 10177.0 10192.5 10194.0 10195.0 10195.5 10196.5 10231.5 10233.5 10234.0 10236.0 10236.5 10264.0 10277.0 10316.5 10319.0 10332.0 10334.0 10337.5 10345.5 10348.5 10351.5 10364.0 10366.0 10381.5 10392.0 10393.0 10393.5 10441.0 REHARKS: 10331.0 10335.0 10337.5 10345.5 10348.5 10353.0 10365.5 10369.0 10395.0 10395.5 10396.0 10441.0 10321.0 10382.5 10441.0 PASS 4. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. / ? ?MATCH7. OUT / ? ?MATCH8. OUT $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 2O * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 24 Tape File Start Depth = 10441.000000 Tape File End Depth = 9953.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11726 datums Tape Subfile: 5 169 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass i gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: 1, 2, 3, 4 1, 2, 3, 4 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL FOUR PASSES. $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GRCH CNAV 68 i GAPI 2 NPHI CNAV 68 i PU-L 3 FUCT CNAV 68 I CPS 4 NUCT CNAV 68 I CPS 4 4 35 725 65 1 4 4 35 725 65 1 4 4 35 725 65 1 4 4 35 725 65 i 16 * DATA RECORD (TYPES 0) Total Data RecOrds: 20 1006 BYTES * Tape File Start Depth = 10441.000000 Tape File End Depth = 9953.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16612 datums Tape Subfile: 6 43 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9964.0 2418 9972.0 $ LOG HEADER DATA STOP DEPTH 10403.0 10412.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MOD. GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 05-NOV- 93 FSYS REV. J001 VER. 1.1 1629 05-NOV-93 10407.0 10407.0 10000.0 10405.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA 0.000 11100.0 0.0 PRODUCED / SEAWATER 0.00 0.0 225.0 0 0.0 0.000 0.000 0.000 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GR 2418 68 i GAPI 2 CNC 2418 68 i PU-L 3 CN 2418 68 i PU-L 4 LSN 2418 68 i CPS 5 SSN 2418 68 i CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 i LB 9 TEN 2418 68 i LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 73 Tape File Start Depth = 10419.000000 Tape File End Depth = 9963.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 29977 datums Tape Subfile: 7 Minimum record length: Maximum record length: 148 records... 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER= 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0. 2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GRCH 9984.0 2418 9984.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10408.0 10416.0 05-NOV-93 FSYS REV. J001 VER. 1.1 1655 05-NOV-93 10407.0 10407.0 10000.0 10405.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MOD. GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ TOOL NUMBER 3507XA 1310XA 2418XA 2323XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED / SEAWATER 0.00 0.0 225.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR 2418 68 1 GAPI 2 CNC 2418 68 i PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 i CPS 5 SSN 2418 68 i CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 72 Tape File Start Depth = 10424.000000 Tape File End Depth = 9976.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34543 datums Tape Subfile: 8 Minimum record length: Maximum record length: 147 records... 62 bytes 1006 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GRCH 9971.0 2418 9979.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL .(FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10407.0 10416.0 05-NOV-93 FSYS REV. J001 VER. 1.1 1721 05-NOV-93 10407.0 10407.0 10000.0 10405.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MOD. GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ TOOL NUMBER 3507XA 1310XA 2418XA 2323XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED / SEAWATER 0.00 0.0 225.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN : BP EXPLORATION WN : B -10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves-. Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 72 Tape File Start Depth = 10424.000000 Tape File End Depth = 9976.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 47908 datums Tape Subfile: 9 Minimum record length: Maximum record length: 147 records... 62 bytes 1006 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0.2500. FILE SUMMARY VENDOR TOOL CODE START DEPTH GRCH 9953.0 2418 9968.0 $ LOG HEADER DATA STOP DEPTH 10426.0 10434.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MOD. GR GAMMARAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 10.625 05-NOV-93 FSYS REV. J001 VER. 1.1 1745 05-NOV-93 10407.0 10407.0 10000.0 10405.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA 0.000 11100.0 0.0 PRODUCED / SEAWATER 0.00 0.0 225.0 0 0.0 0.000 0.000 0.0.00 0.0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 4. $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units I GR 2418 68 i GAPI 2 CNC 2418 68 I PU-L 3 CN 2418 68 i PU-L 4 LSN 2418 68 I CPS 5 SSN 2418 68 i CPS 6 CCL 2418 68 1 7 SPD 2418 68 I F/MN 8 TTEN 2418 68 i LB 9 TEN 2418 68 i LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 79 Tape File Start Depth = 10441.000000 Tape File End iDepth = 9953.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 54074 datums Tape Subfile: 10 Minimum record length: Maximum record length: 154 records... 62 bytes 1006 bytes Tape Subfile 11 is type: LIS 93/12/02 01 **** REEL TRAILER **** 93/12/ 2 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 2 DEC 93 4:20p Elapsed execution time = 51.79 seconds. SYSTEM RETURN CODE = 0 B - 10 ~~ ~>~q~/ PRUDHOE BAY ¢~ IVED S EP ~ 8 Al~$k~ 0~1 & ~s ¢~ns. Run 1: 11 - SEP - 1995 CNIGR Cased Hole 10000 0418 WESTERN ATLAS Logging Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD B - 10 500292032100 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 21-SEP-95 4468.04' K. RICHARDS S. SHIRZADI 31 liN 14E 2069 1611 64.29 0.00 37.24 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 10011.0 3RD STRING 7.000 11100.0 PRODUCTION STRING 4.500 10344.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 20-SEP-78 SWS BASELINE DEPTH 10020.0 10034.5 10035.5 10036.0 10037.0 10042.5 10066.0 10076.5 10077.0 10078.0 10079.5 10084.0 10099.0 GRCH 10019.5 10034.0 10034.5 10035.0 10035.5 10043.5 10067.0 10079.0 10079.5 10080.0 10082.5 10087.0 10100.5 EQUIVALENT UNSHIFTED DEPTH 47.00 29.00 12.60 10099.5 10103.0 10115.0 10165.5 10166.0 10167.0 10175.5 10176.5 10177.0 10197.0 10225.5 10246.0 10249.0 10250.0 10270.0 10270.5 10271.0 10275.0 10339.5 10340.5 10341.5 10350.5 10368.0 10369.0 10369.5 10370.0 10371.5 10372.0 10372.5 10379.5 10380.0 10380.5 $ REMARKS: 10101.0 10106.5 10118.5 10168.0 10168.5 10169.0 10177.5 10178.0 10178.5 10197.0 10224.5 10247.0 10250.0 10250.5 10271.0 10272.0 10273.0 10277.0 10339.0 10339.5 10340.0 10349.0 10365.5 10366.0 10366.5 10367.5 10369.0 10372.0 10372.5 10377.5 10378.0 10378.5 CN/GR Cased Hole. CORRELATED TO CN LOG, DATED:05-NOV-93 WELL TEST SUMMARY TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE 'NET WATER RATE FORMATION GAS RATE LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE MANIFOLD TEMPERATURE WATER CUT (CALC) 10-SEP-95 HOURS 4.0 MBPD 2.40 MBOPD 1.07 MBWPD 1.33 MMSCF/STB 3.60 SCF/STB 3366 MMSCFD 0.00 PSIG 0 SCF/STB 3366 SCF/STB 1500 9.31 PSIG 259 DEGF 154 PCNT 55.0 GAMMA RAY IS VERY HOT DUE TO SCALE BUILD UP IN WELL. WELLHEAD PRESSURE WAS 2300 PSI DURING LOGGING. NO FLUID WAS PUMPED BEFORE LOGGING. NEUTRON LOG PARAMETERS: LIMESTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 9990.0 10408.0 2418 10000.0 10418.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 10024.0 10055.5 10056.0 10063.0 10065.5 10080.0 10099.0 10161.0 10165.0 10166.0 10167.0 10167.5 10170.0 10171.5 10172.0 10172.5 10173.5 10177.0 10193.0 10194.0 10194.5 10196.0 10325.0 10327.5 10328.0 $ REMARKS: PASS 1. NPHI 10023.0 10057.0 10057.5 10063.5 10066.0 10080.0 10100.5 10163.0 10167.0 10167.5 10168.0 10168.5 10170.5 10172.0 10173.0 10173.5 10174.0 10177.5 10191.0 10192.0 10194.5 10196.0 10326.5 10329.0 10329.5 EQUIVALENT UNSHIFTED DEPTH FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN / ? ?MATCH1B . OUT $ : BP EXPLORATION (ALASKA) : B-10 : PRUDHOE BAY : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 21 1006 BYTES * Tape File Start Depth = 10440.000000 Tape File End Depth = 9935.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5056 datums Tape Subfile: 2 217 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9990.0 10408.0 10000.0 10418.0 BASELINE DEPTH ~ 9985.0 9994.5 10015.0 10016.0 10027.5 10029.5 10030.5 10031.0 10031.5 10037.5 10044.5 10056.0 10056.5 10061.5 10065.5 10068.5 10074.0 10075.0 10079.0 10079.5 10080.0 10082.0 10082.5 10084.0 10085.0 10085.5 10086.5 10088.0 10097.5 10098.0 10098.5 10099.0 10099.5 10100.0 10100.5 10101.0 10102.0 GRCH 9984.5 9994.0 10017.0 10018.0 10029.0 10029.5 10030.0 10031.0 10037.0 10045.0 10056.5 10057.5 10069.5 10080.5 10081.0 10082.5 10100.0 10100.5 10101.0 10101.5 10102.0 10103.5 10104.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10026.5 10061.5 10066.0 10074.5 10075.0 10078.5 10081.0 10082.5 10084.0 10084.5 10085.0 10085.5 10087.0 10099.5 10100.5 10101.5 10103.'0 10103.5 10102.5 10103.5 10104.0 10105.5 10106.5 10109.0 10109.5 10111.0 10111.5 10114.5 10115.5 10116.5 10117.0 10117.5 10118.5 10119.5 10126.5 10127.5 10129.5 10130.0 10130.5 10146.0 10147.0 10148.0 10149.5 10150.5 10153.5 10154.5 10159.0 10165.5 10166.5 10167.5 10168.0 10169.0 10172.0 10177.0 10178.0 10180.0 10183 .'0 10183.5 10185.5 10192.5 10193.5 10194.0 10194.5 10195.0 10195.5 10197.0 10197.5 10198.5 10199.0 10200.0 10203.0 10210.5 10211.5 10214.0 10215.0 10215.5 10216.0 10225.5 10105.5 10114.0 10115.0 10157.0 10157.5 10162.0 10168.0 10169.0 10169.5 10179.0 10184.5 10185.0 10192.5 10195.5 10196.5 10197.0 10197.5 10198.0 10202.5 10210.0 10210.5 10213.0 10213.5 10214.0 10215.0 10224.5 10105.0 10106.0 10107.5 10108.0 10110.5 10111.5 10116.5 10117.0 10118.0 10119.0 10119.5 10120.0 10120.5 10127.5 10128.0 10130.0 10131.0 10131.5 10148.5 10149.5 10150.0 10151.5 10152.0 10169.5 10170.0 10173.0 10178.0 10178.5 10180.0 10185.5 10192.0 10192.5 10193.5 10194.5 10199.5 10226.0 10226.5 10231.0 10232.0 10233.0 10236.5 10238.0 10244.5 10245.0 10246.0 10246.5 10247.0 10247.5 10249.0 10249.5 10250.0 10251.0 10251.5 10252.5 10253.0 10255.5 10257.5 10264.5 10266.0 10270.0 10270.5 10273.0 10273.5 10274.0 10275.5 '10276.5 10277.0 10290.0 10292.0 10293.0 10303.0 10305.5 10307.0 10310.5 10311.5 10315.0 10317.0 10319.0 10326.5 10328.0 10330.0 10337.0 10338.0 10340.5 10341.0 10341.5 10346.0 10353.0 10354.0 10356.0 10356.5 10358.0 10359.0 10363.0 10363.5 10225.5 10227.5 10232.0 10232.5 10233.0 10236.5 10238.5 10246.5 10247.0 10248.0 10250.5 10251.0 10252.0 10256.0 10258.5 10271.0 10272.0 10274.5 10275.0 10275.5 10293.5 10294.0 10306.5 10307.5 10311.0 10311.5 10330.0 10338.5 10339.0 10340.0 10351.5 10352.0 10354.0 10355.0 10356.5 10357.0 10361.0 10362.0 10244.5 10245.5 10247.0 10250.5 10251.5 10253.5 10254.0 10254.5 10264.5 10266.0 10276.5 10277.5 10278.5 10290.0 10292.0 10302.0 10315.5 10317.5 10319.0 10326.0 10327.5 10330.0 10335.5 10336.0 10339.5 10346.0 10365.5 10366.5 10368.0 10369.0 10370.0 10370.5 10373.5 10374.5 10376.5 10377.5 10385.5 10386.0 10387.0 10390.0 10391.5 10402.0 10403.0 10404.0 10410.0 10414.0 10414.5 10430.0 10430.5 $ REMARKS: 10364.0 10364.5 10366.0 10366.5 10367.5 10369.0 10372.0 10372.5 10374.5 10375.0 10384.5 10389.5 10400.0 10400.5 10402.5 10412.5 10414.5 10430.0 10430.5 10386.0 10386.5 10387.0 10390.0 10403.0 10410.0 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH2A. OUT / ? ?MATCH2 B . OUT $ : BP EXPLORATION (ALASKA) :B-10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 21 Tape File Start Depth = 10440.000000 Tape File End Depth = 9935.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5056 datums Tape Subfile: 3 235 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9990.0 10000.0 10000.0 10418.0 BASELINE DEPTH 9995.5 10002.0 10002.5 10015.0 10015.5 10016.5 10019.5 10022.0 10022.5 10027.5 10028.5 10030.5 10034.5 10035.5 10036.0 10052.0 10052.5 10054.0 10055.0 10061.5 10069.0 10071.0 10075.5 10076.0 10079.0 10080.0 10082.0 10083.0 10084.0 10O85.5 10086.0 10091.5 10092.0 10098.0 10098.5 10099.5 10100.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH GRCH NPHI 9994.5 10004.0 10004.5 10017.5 10018.5 10014.5 10019.5 10020.0 10023.5 10024.0 10028.0 10028.5 10030.5 10035.0 10035.5 10036.0 10053.0 10050.0 1005'0.5 10055.0 10057.0 10062.5 10071.0 10072.0 10076.0 10076.5 10080.5 10081.5 10083.5 10084.0 10084.5 10086.0 10087.0 10092.5 10094.0 10101.5 10102.0 10102.5 10103.0 10102.0 10100.5 10101.0 10102.5 10104.5 10108.5 10109.0 10118.0 10119.5 10121.0 10123.5 10124.0 10125.0 10136.0 10137.0 10146.5 10147.5 10149.0 10150.5 10153.5 10166.5 10169.5 10170.0 10170.5 10171.0 10173.5 10174.0 10175.5 10176.5 10177.0 10177.5 10185.0 10186.5 10188.5 10190.5 10192.0 10193.0 10195.0 10195.5 10196.5 10197.5 10198.0 10198.5 10203.0 10203.5 10204.0 10204.5 10211.0 10212.0 10212.5 10213.0 10213.5 10214.5 10226.5 10227.5 10228.0 10228.5 10229.0 10231.5 10233.0 10234.0 10104.0 10173.0 10173.5 10176.5 10177.5 10179.0 10179.5 10180.0 10190.0 10192.0 10194.0 101.97.5 10198.0 10204.0 10205.0 10205.5 10211.0 10212.0 10213.0 10214.0 10214.5 10226.5 10227.0 10228.0 10228.5 10231.0 10233.5 10234.0 10102.5 10104.0 10107.0 10111.0 10112.0 10121.0 10121.5 10123.0 10127.0 10127.5 10128.0 10139.0 10139.5 10149.0 10149.5 10151.0 10152.0 10155.0 10169.0 10172.5 10173.0 10178.5 10179.0 10185.5 10187.0 10192.0 10192.5 10194.5 10195.5 10198.0 10199.0 10203.5 10204.5 10214.5 10234.5 10235.0 10236.0 10241.0 10244.5 10245.0 10245.5 10246.0 10250.5 10251.5 10252.0 10252.5 10255.0 10257.5 10258.5 10259.5 10261.5 10262.5 10263.0 10268.0 10268.5 10270.0 10270.5 10273.0 10279.5 10280.5 10290.5 10292.5 10297.0 10298.0 10305.0 10306.0 10321.0 10322.0 10327.5 10328.5 10329.0 10329.5 10330.0 10331.5 10332.0 10333.0 10333.5 10335.0 10336.0 10339.5 10354.5 10355.5 10356.0 10356.5 10366.5 10368.0 10368.5 10369.0 10369.5 10370.0 10371.0 10372.0 10374.0 10375.0 10376.5 10235.0 10235.5 10243.0 10247.0 10247.5 10252.0 10252.5 '10253.0 10254.0 10256.5 10259.5 10260.5 10261.0 10269.5 10270.5 10272.0 10273.5 10282.5 10283.0 10299.5 10300.0 10307.0 10307.5 10322.5 10323.0 10328.5 10329.0 10329.5 10330.0 10336.5 10339.5 10354.5 10355.0 10355.5 10356.5 10366.5 10367.5 10368.0 10371.5 10373.5 10374.0 10375.5 10245.5 10246.5 10248.0 10248.5 10261.5 10262.0 10262.5 10274.5 10291.0 10293.0 10331.5 10333.0 10334.0 10335.0 10336.0 10337.5 10369.0 10370.5 10371.5 10377.5 10385.0 10387.5 10401.5 10402.0 10403.0 10404.0 10420.5 10423.5 10430.0 10430.5 $ REMARKS: 10376.0 10386.0 10400.5 10401.0 10401.5 10403.5 10372.5 10374.5 10375.0 10387.0 10422.5 10423.0 10429.5 10430.0 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT /??MATCH3A. OUT / ? ?MATCH3 B . OUT $ : BP EXPLORATION (ALASKA) : B-10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 21 Tape File Start Depth = 10440.000000 Tape File End Depth = 9935.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10.112 datums Tape Subfile: 4 223 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-L 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 4 38 995 99 i 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 21 Tape File Start Depth = 10440.000000 Tape File End Depth = 9935.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10112 datums Tape Subfile: 5 44 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9948.0 2418 9958.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10420.0 10430.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PCM PCM/CCL GR GAMMARAY CN COMPENSATED NEUTRON $ ll-SEP-95 FSYS REV. J001 VER. 1.1 0934 ll-SEP-95 10604.0 10420.0 10000.0 10418.0 1200.0 YES TOOL NUMBER 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 9500.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B- 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN · 8 TEN. 2418 68 1 LB 4 4 42 310 01 4 4 42 995 99 1 4 4 42 890 01 4 4 42 334 31 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 71 Tape File Start Depth = 10433.000000 Tape File End Depth = 9937.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27978 datums Tape Subfile: 6 146 reCords... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9969.0 2418 9979.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10421.0 10431.0 ll-SEP-95 FSYS REV. J001 VER. 1.1 1003 ll-SEP-95 10604.0 10420.0 10000.0 10418.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 9500.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS) : 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) :B-10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 68 Tape File Start Depth = 10434.000000 Tape File End Depth = 9962.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27114 datums Tape Subfile: 7 143 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9960.0 2418 9970.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10024.0 10434.0 ll-SEP-95 FSYS REV. J001 VER. 1.1 1031 ll-SEP-95 10604.0 10420.0 10000.0 10418.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 9500.0 0.O00 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B-10 : PRUDHOE BAY : NORTH SLOPE : ALASKA 0.0 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 70 Tape File Start Depth = 10437.000000 Tape File End Depth = 9949.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 45556 datums Tape Subfile: 8 145 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: LIS 95/ 9/21 01 **** REEL TRAILER **** 95/ 9/22 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes· End of execution: Fri 22 SEP 95 7:13a Elapsed execution time = 9.28 seconds. SYSTEM RETURN CODE = 0 11 000000 11 000000 1111 O0 O0 1111 O0 O0 11 O0 0000 11 O0 00=00 11 O0 O0 O0 11 O0 O0 O0 11 0000 O0 11 0000 O0 11 O0 O0 11 O0 O0 11111.1 000000 111111 000000 7777777777 7777777777 77 77 77 77 77 77 77 77 77 77 77 77 000000 666666 666666 O0 66 O0 O0 66 O0 0000 66 0000 O0 66666666 0000 O0 66 66 0000 O0 66 66 O0 O0 66 66 O0 O0 66 66 000000 666666 000000 666666 5555555555 5555555555 55 55 555555 555555 55 55 55 55 55 55 55 55 555555 555555 44 44 44 44 44 44 4'4 44 44 44 44 44 4444444444 4444444444 44 44 44 44 44 44 5555555555 5555555555 55 55 555555 555555 55 55 55 55 55 55 55 55 555555 555555 666666 11 666666 11 66 I I 66 1, 66 11 66666666 I1 66666666 11 66 66 11 66 66 11 66 66 I1 66 66 II 666666 1111 666666 1111 11 11 M M MM MM M M M M M M M M M M M j AAA d A A J A A J A A J J AAAAA d d A A jJJ A A PPPP RRRR P P R R P P R R PPPP RRRR P R R P R R P R R U U DDDD U U O D U U D D U U D D U U D D U U D D UUUUU DDDD H H (')OO EEEEE H H O O E H H O O E HHHHH O O EEEE H H 0 O E H H O O E H H O~)O EEEEE *START* MONIT()R *START* MONITOR USER PCCC SWS KLIOB31 USER PCCC SWS KLIOB]I [10706,54561] JOB 21'NOV'78 *START* [1~706,54561] JOB 21 NOV-78 *START* SHIP SEQ. SHIP SEO. _~232 DATE 29-d~N-79 3232 DATE 2q-OAN-79 16:56:44 16:56144 SSSSSSSS HH HH SSSSSSSS HH HH SS HH HH SS HH HH SS HH HH SS HH HH SSSSSS HHHHHHHHHH SSSSSS H H HHHHH HHH SS HH HH SS HH HH SS HH HH SS HH H[~ SSSSSSSS HH HH SSSSS.SSS HH HH IIIIII PPPPPPPP IIIII1 PPPPPPPP II PP PP II PP PP II PP PP II PP II PPPpPp'ppPP II PPPPPPPP II PP II PP II PP II PP IIIIII PP IIIIII PP O0 O0 TT OO O0 T~T O0 O0 TT O0 O0 T~ O0 O0 TT O0 O0 TT O0 O0 TT O0 O0 TT O0 O0 TT O0 O0 TT 000000 TT 000000 $START~ USER PCCC [30706,54561] JOB SHIP SEO. ]2]2 MONITOR SWS KLIOB31 21-NOV-78 ~START~ FILE: DSKHCSHIP T0<255>[~0706,54561~ CREATED: 29-JAN-7~ PRINTE6: 29-JAN-779 16:57:0 QUEUE SWITCHES: /FILE:FORT /COPIES:/ /SPACING:I /LIMIT:III /FORMS:NORMAL DATE 2g-JAN-79 15:01:37 16:56:44 SHIPPING INSTRUCTIONS iSSUED 29-JAN-79 15:00 SHIP TO : PCCC BY MJA PCCC VV VV EEEEEEEEEE RRRRRRRR ¥¥ VV EEEEEEEEEE RRRRRRRR VV VV EE RR RR VV VV EE RR RR VV VV EE RR RR VV VV EE RR RR VV VV EEEEEEEE RRRRRRRR VV VV EEEEEEEE RRRRRR~R VV VV EE RR RR VV VV EE RR RR VV VV EE RR RR VV VV EE RR ~R VV EEEEEEEEEE RR RR VV EEEEEEEEEE RR RR III III I I I I I I I I I I III III III III I I I I I I I I I III III FFFFFFFFFF FFf'FFFFFFF FF FF FFFf'FFFF f'FFFFFFF FF FF FF FF FF FF YY YY ¥¥ Y¥ YY YY YY YY YY YY YY YY YY YY YY YY YY YY YY YY 000000 000000 000000 000000 O0 O0 00 O0 llll O0 O0 O0 O0 1111 oo O0 O0 O0 OO 11 O0 O0 O0 O0 11 000000 000000 1111 000000 000000 1111 1I I! *START* USER PCCC [10706 54561] JOB SHIP SEQ. MONITOR SWS KL10B31 2 FILE: DSKH:VERIFY.001 CREATED: PRINTED: QUEUE SWITCHES: , /SPACING:! /LIMIT:Il3 /FORMS:NORMAL 3232 DATE 2q-JAN-79 2g-JAN-79 15:19:05 16:56:44 PACI~IC COAST COMPUTING CENTER 10706,54561 REEL HEADER LENGTH: 112 BYTES REEL NAME: P.C.D.C. SERVICE NAME: EDIT REEL CONTINUATION NUMBER: Ol PREVIOUS REEL NAME: COMMENTS: LIS FORMAT CUSTOMER TAPE TAPE HEADER LENGTH: 1.32 BYTES TAPE NAME: 54561 SERVICE NAME: EDIT TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: COMMENTS: DATE: 79/ 1/29 DATE: 79/ 1/29 EOF FILE HEADER LENGTH: 62 BYTES FILE NAME: EDIT .001 MAXIMUM PHYSICAL RECORD LENGTH: PREVIOUS FILE NAME: 024 BYTES ~ R WELL SITE INFORMATION RECO D LENGTH: 147 BYTES COMPANY: WELL: FIELD: COUNTY: STATE: SOHIO PETROLEUM CO. B-! -10-14) PRU NORTH SLOPE ALASKA DATA FORMAT SPECIFICATION LENGTH: 290 BYTES ENTRY BLOCKS: TYPE 0 SIZE REP CODE ENTRY 1 66 0 DATUM SPECIFICATION BLOCKS: '~N E TRY lC TOO6 SVORD# []NITS API AP1 AP1 APl FILE# SIZE EXP PROC SAN REP DEPT SHIFT DEPT 2 SP DIL CILD DIL CILM DIL CLL8 DIL 6 GR BHC 7 DT BHC FT 0 0 0 0 0 4 0 0 I 68 0 0 MU 7 I 0 0 0 4 0 0 168 0 0 MMHO 7 I1 46 0 0 4 0 0 I 68 0 0 MMHO ~ 11 4~ 0 0 4 0 0 0 GAPI 7 31 32 0 0 4 0 0 1 68 0 0 US/F 7 52 32 0 0 4 0 0 1 68 0 0 DEPTH 8870.000 8800.000 8700.000 8600.000 8500.000 8400.000 8300.000 8200.000 8100.000 8000.000 7900.000 7800.000 7700.000 7600.000 7500.000 7400.000 7300.000 7200.000 7100.000 MN EMONIC SP SP GR SP GR SP GR SP GR R SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR VALUE MNEMONIC VALUE MNEMONIC VALUE CIhM -999.250 -973.374 CILD -999.250 -999.250 DT -999.250 27.183 CILD 3?3.250 CILM 356.451 203.600 DT 116.800 20.828 CILD 3'31.I31 CILM 319.154 100.200 DT 99.600 I3.738 CILD 549541 CILM 478.630 124.200 DT 111'.050 23.272 CILD 373.250 145.500 DT 110.600 CILM 346.737 1:4.716 : CILD 6:42.688 , CILM 564.937 171.300 DT 104.800 17.405 CILD 737.904 CILM 666.807 157-300 DT IH'.050 21.317 CILD 469.894 CILM 432.514 130,900 DT 97.100 16.916 CILD 440.555 CILM 401.791 72.500 DT 88.200 19.850 CiLD 487. CILM 4 84.300 DT 91'529300 44.631 21.317 CILD 444.631 CILM 413.047 100.000 DT 96.250 21.561 CILD 452.898 CILM 424.620 83.200 DT 92.900 21.317 CILD 394.457 CILM 369.828 87.400 DT 91.450 20.828 CILD 369.828 CILM 343.558 86.900 DT 90.700 20.828 CILD 409.261 CILM 387.258 91.400 DT 97.750 17.650 CILD 401.791 CILM 376.704 71.400 DT 97.600 22.783 CILD 369.828 CILM 349.945 97.100 DT 97.300 22.539 CILD 313.329 CILM 296.483 96.900 DT 96.250 23.761 CILD 310.456 CILM 288.403 86.200 DT 97.300 MNEMONIC CLL8 CLI.,8 CLL8 CLL8 CLL8 CL58 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 CLL8 VALUE -999.250 283.139 177.011 280. 543 237.684 363.078 461.318 337.287 343.558 376.704 369.828 366.438 322.107 296.483 331.131 296.483 291.072 248.886 258.226 DEPTH MNEMONIC VALUE MNEMONIC 'VALUE MNEMONIC VALUE MNEMONIC VALUE 7000.000 6900.000 6800.000 6700.000 6600.000 6500.000 6400.000 6300.000 6200.000 6100.000 6000.000 5900.000 5800.000 570O.OO0 5600.00O 5500.000 54O0.O0O 5300.000 5200.000 SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR SP GR 28.161 CILD 220.800 21.805 CILD ]83.707 73.200 DT 98.450 39'162 CILD 398 73.700 DT 93~ 78.275 CILD 405. 58.000 DX 96' 61.163 CILD 325. 61.000 DT 93. 42.095 CILD 267. 9 3' O00 :DT 97., 7 52 CILD 49.673 CILD 81.400 DT 22.783 CILD 84.300 DT 70.697 CILD 42.500 DT 35.006 CILD 57.900 DT 79.741 CILD 38.200 DT 80.964 CILD 36.400 DT 23.761 ClLD 77.500 DT 76.319 CILD 43.200 DT 27.672 CILD 74.000 DT 50.651 CILD 56.900 DT 40.384 CILD 55.900 DT 242. 96. 293. 96. 608. 101. 413. 97. 1066. 111. CILM 21,2.814 C ILM 31 3 . 329 CILM 373.250 928. 105. 373. 104. 654. 109. 515. 104. 534. 111. 304. 119. 107 ClLM 250 509 CILM ]22.107 800 087 CILM 255. 859 45O 917 CILM 265.461 500 047 CiLM 343.558 100 103 CILM 235.505 500 765 CILM 263.027 300 135 CILM 478.630 85O 047 CILM 334.195 100 596 CILM 809.096 650 966 CILM 731.139 700 250 CILM 390.841 5OO 636 CILM 515.229 200 229 CILM 483.059 000 564 C1LM 483.059 ]00 789 CILM 288.403 2OO CLL8 210.863 CLL8 299.226 CLL8 343.558 349.945 CLL8 270.396 CLL8 181.970 CLL8 190.546 CLL8 242.103 CLL8 197.697 CLL8 231.206 CLL8 175.388 CLL8 167.494 CLL8 173.780 CLL8 165.959 CLL8 169.044 CLL8 353.183 CLL8 175.388 CLL8 398.107 CLL8 255.859 CLL8 207.014 DEPTH 5100.000 5000.000 4900,000 4800.000 4700,000 4600.000 4500.000 4400.000 4300.000 4200.000 4100.000 4000.000 3900.000 3800.000 3700.000 3600.000 3500,000 3400.000 3300.000 MNEMONIC SP GR SP GR SP GR SP $P SP GR SP SP GR SP GR SP GR SP GR SP GR SP GR SP SP GR SP SP $P SP GR VALUE MN 34.028 63.500 39.895 69.900 54.807 51.200 55.05I 71.300 53.096 55.200 81,942 37.900 EMONIC VALUE MNEMONIC VALUE MNEMONIC VALUE CILD 325.087 CILM 293.765 CLL8 237.684 DT 111.100 CZLD 319 I54 CZLN 283.139 CL,L8 165.959 OT 1081450 CILD 288.403 CILM 224.905 CUL8 57.544 DT 81.000 CIhD 127,057 CILM I20,226 CLL8 138,038 DT 117.900 CILD 369.828 CILM 319,154 Chh8 214,783 DT 120.450 ClLD 487-529 DT 123.400 82.186 CILD 40,400 :~'DT 31.584 CIbD 34.800 DT 72.652 CILD 42.600 DT 501.187 125~800 46.132 147.750 316.228 124,300 31.339 CILD 192.309 68.600 DT 114.500 26.695 CILD 192.309 78.800 DT 129.350 42.438 CILD 180.409 65.438 DT 0.000 33.719 CILD 141.671 70.188 DT 0.000 52.375 CILD 177.040 58.313 DT 0.000 28.953 CILD 152.654 79.750 DT 0.000 58.963 CILD 173.780 55.400 DT 115.600 58.474 CILD 208.930 52.200 DT 121.900 63.363 CILD 188.799 52.500 DT 120.200 41.362 CILD 158.489 72.700 DT 124.100 CILM 409.261 CILM 424.620 CLL8 CLL8 214.783 220.800 CILM 45.709 ChL8 63.096 CILM 270.396 CILM 181.970 CILM 201.372 CILM 168.977 CILM 143.177 CILM 165.911 CILM 162. 850 CILM 154.170 CILM ' 197.697~ CLL8 CLL8 CLL8 CLL8 CLL8 CLI.,8 CLL8 Chh8 CLL8 CLL8 CLL8 CILM 167.494 CILM 155.597 141.906 148.594 190.546 155.907 116.047 122.605 142.143 110.662 113.763 113.763 1.45.881 DEPTH MNEMONIC ]200.000 SP GR .~lO0.O00 SP GR 3000.000 SP GR 2900.000 SP GR 2800.000 SP GR 2700. 000 SP GR 2600.000 2565.000 SP GR VALUE 70. 697 49.200 .90 36.228 63-900 MNEMONIC VALUE C iLD DT C I L D DT CILD DT CDILD T CILD DT MNEMONIC VALUE 285.759 CILM 253.513 130,550 ¥~,46I CILM 258,226 ,450 CILM 288.403 387.258 CILM 353-18] 1.35.450 428.549 CILM 383.707 138,500 ]4.~63 CIi~D 7. 00 DT 13 .087 .5O0 3.716 CILD 9999.998 0,000 ~ DT 0~'000 716 :ooo MNEMONIC VALUE CLL8 I 34. 276 CbI~8 208.9]0 CLL8 199.526 CLL8 226.986 CLL8 233. 346 CILM 307.610 i CLL8 C.II.,M 9999.998 CLL8 CILD 9999 998 CiLM 9999.998 DT 0~000 242.10] 9999.998 CLL8 9999.998 SUMMARY OF DATA ~ECORDS NUMBER OF RECORDS: 351 LENGTH OF RECORDS: 1014 BYTES LENGTH OF LAST RECORO:' ]14 BYTES FILE TRAILER LENGTH: 62 BYTES FILE NAME]: EDIT .001 MAXIMUM PHYSICAL RECORD LENGTH: NEX, T FILE NAME: EOF TAPE TRAILER LENGTH: 132 BYTES TAPE NAME: 54561 SERVICE NAME: EDIT TAPE CONTINUATION NUMBER: O! NEXT TAPE NAME: C(')MMENTS: 1024 BYTES DATE: 79/ 1/29 _] ~,laska Oi~ & ~as Cons. HiD A~A2KA PETROLEUM COmPANy' UDHOK BAY S b O [' E 6CHLU,,'!BERGER : 000 000 030 065 000 000 004 065 000 000 011 065 000 000 O03 O65 000 000 003 065 OhO 0oo 002 065 UO0 000 007 065 oho 000 006 065 000 000 003 065 :L PS1 O0 150 O~ ' PS2 ;ill P$2 PU O0 890 O0 0 ~AT PS2 0 0 420 iRA PS., O0 000 O0 0 0 :ML PS2 CPS O0 330 31 0 0 'Nb P82 CPS O0 330 30 0 0 4 ~L PS~ O0 ~50 O1 0 0 4 ~ PS~ GAPl 00 3~0 Ol O 0 4 ~I PS3 PU O0 890 O0 0 0 /AT PS3 O0 420 Ol O 0 4 I~A P$3 O0 000 O0 0 0 4 iNL PS3 CPS OO 330 31 ~ 0 4 INL P$~ CPS O0 330 30 0 0 4 IL P$3 9~ 150 O1 0 0 4 ( PS4 GAPI O0 310 O~ 0 0 4 ~HI P&4 PU OU 890 O~ 0 0 4 '0 '  68 000000000 0000 68 00000000000000 1 68 00000000000000 1 68 00000000000000 I 68 O0000OO0000000 I 68 00000000000000 ~ 68 I 68 ~§~0000'00000oo 00o0000000o 68 00000000000000 I 68 00000000000000 1 68 O00000000000UO 1 68 00000000000000 1 68 00000000000000 23 1560 19 2 ,5560 ~,,~,~'t 2'78,32 ~NRA ,3'046 512 ~0:0:0:0 :':CCI!, ::' 0 :~ 1"!5'9'5: GR: ' 2:6 · 8:43:7 . ¢-~ .-~ , . ~ ~ ' ?o'7~2~ ~RA 2.6367 ,01.30 · G.R 30,4688 NPHi 2,~7~ NCNb ~598,0000 0600.00:00 OR 1:7.g687: 2,83~0 NCI,II~ 1517,0000 FCNL 53 000) CCL I6. ~4~7 NPMi NR~T z.'~77-9] ~NRA ¢. ' ~'"~ "'~ 5o00 cob 1 45 OuO(, ~_C~ b 55 , '~'8 6035 NCNb I ,5i .,i MR~T ,5957 RNRA 576,5000 C~L -0,0716 GR 2 ,4844 N~HI ~.R672 ~NRA ~i9062 NCNb 2.6934 '0,0456 2.63:28 16,9219 1502.000:0 21.9727 521,0000 10500 OUO9 GA 34 6875 NPHi 7,3'130 N~AT t:~92~ NCNb 215~0000 WCNb 1137.0000 CCI, 24,4~86 NPHi 8..1543 NKAI 1.9307 Rt~RA 2452.000~ ~CNb t~30.0000 CCI, -0.0732 GR , 078i ~;~T 1,6768 RNRA 1,7~42 NCNb lP5 .0000 CCL -0,1302 ~R 26ii094 NPMI 1.8633 R~RA 1.9219 NCNL 2036,0000 FCNL -0.1!56 1,869i 0,1660 1 9932 25~4531 2234,0000 7,3242 1059.0000 10400 O00o GR 23.7500 NPNI 18,0664 NRAT 2~7d32 NCNb 2324,0000 FCNb 835,0000 CCL 2- 4219 NPHi 17 2U52 NR~T ~.5762 RNRA 2310 (}00u FCNL 810 5000 CCL -0,0179 GR 15~5762 NRAT 2[4648 RNRA ~.4707 NCNb R95 OooO CCL 0,128~ Gi< 28.625(3 NPHI ?[6309 PaRA 2.7832 NCNb 2228,0000 FCNL 2.6270 -O,O?6b 24,375U 2212.0000 18.1152 800.5000 L'I'~I'I [I1 iii ~I:4 ~[': [:4 ~ RA 3. NL 1435, Hi 63, Nh 274. ~T 4. PT 9985 ~A -999' NL :999. 999, 'HI '999, 'NL 99q. L -0, 22,.7539 NflAT ~:07 ,'!'~ .... ~' 85:. 8'I~5 4.9062 OOOO G~ 36,~:I:~7~H1 60.30~7 NRA 5469 NC~!b 1398,0000 FCN~ 252.0000 CCL - 0798 828I NPH:I 56:28359: NRAT 4;~227RN:RA .1758 o"o' - 3~,50o0 O.O FCNL 277.2bOU CCL 0,0'11.6 GR 5742 NRAT 5;0820 RNRA 5.1523 NCNb 1412,0000 0~00 CCL -0,1318 G~ 34,5938 NP,Hi 56,8359 7227 WNR, A 4.7g30. . . ~C~I., 1365,0000 FCN 284.7500 0537 5OOu Ga -999.2500 NPHI -999 ~500 NKA'£ -999.2500 ~bO0 ~CNL -99912500 FCNb -999:z500 CCL -999.~500 2500 NPHi -999,2500 ~!i< ~T -999.2500 RNRA -999,2500 0~) FCNb -999.2500 CCL -999.2500 GR -999,2500 250o NR~T -9~9.2500 RNRA -999.2500 NCNb -999,2500 2500 CCI, -999.9500 ~R 43.4063 NPMI 57.6660 7695 RNRA 4.7266 NCNL i4~5.0000 FCN~ 309.7500 10n9 ;RV!CE ~ANE : ,TE : ,XIMU~ LEt;GTH : ]XT FTLE ~)AM~] : .001 I024 11 000000 11 000000 1111 O0 O0 1111 O0 O0 11 O0 0000 11 O0 0000 11 -00 O0 O0 I1 O0 O0 O0 11 0000 O0 11 0000 O0 11 O0 O0 11 O0 O0 111111 000000 111111 000000 7777777777 000000 7777777777 000000 77 00 O0 77 00 O0 77 O0 0000 77 O0 0000 77 O0 O0 O0 77 O0 O0 O0 77 0000 O0 77 0000 O0 '77 00 O0 77 00 00 77 000000 77 000000 666606 666666 66 66 66 66 66666666 66666666 60 66 66 66 66 66 66 66 666666 666666 5555555555 660606 5555555555 666666 55 66 55 66 555555 Ob 555555 66 55 66666666 55 66666666 55 66 55 66 5 66 66 66 000000 606666 000000 666666 O0 O0 06 O0 O0 66 O0 0000 66 O0 0000 66 O0 O0 O0 66066666 O0 O0 O0 66666606 0000 O0 00 66 0000 O0 66 66 O0 66 66 O0 66 66 44 44 44 44 44 44 44 44 44 44 4q 44 44~4444444 4444444444 44 44 44 44 44 44 GGGG G GGG H BBBB H" :B:: :: B H H .B B HH,HNH::':B:B:BB: :~: H H BBBB D :H:HHH~ 0 0 0 0 ~E:EE P R, R OUUOU DDDD H H. O00 EEEEE tt.H HH HH HH PPPPPPf pPppPppt - PP P SSSSSSSS HH HH HH HH HH II II O0 O0 O0 TT O0 OO TT 00 OO  T O0 O0 W O0 O0 TT O0 O0 TT O0 O0 TT T~ *START* USER PCCC [10706,Eb064] JOB ShIP MONITOR SWS KLIOE3~ JUL-?9. *START* FILE: DSKH:SHIP.TO<255>[10706,5~60.641 CREATED: Pi~INTED: 11-OCT-79 13.39.08 QUEUE S~II'CHES: /FILE:~'ORT /COP1E6:I /6PACING:I /LiMIT:122 /FORNS:NORMAL SEQ. 1651 DATE 11-0CT-79 10-OCT-79 13:26:05 13:38:51 S~'IP TI · SHIPPING INST!RUCTi[3NS iSSUED IO-UCT-79 : 13:25 i ~y GHB i PCCC CALI~'i[3RN:IA 93003 VV V¥ RR RR VV EE EE RR, RR EE RR:;: i~.:RR VV EEE~EEEEEER~ RR VV R:Ri IIII] ) I I II II YY :YY YY YY YY 00 O0 33 0.0 O0 33 33 33 O0 O0 00 33 O0 O0 O0 33 000000 000000 000000 000000 *START* USER PCCC [10706,56064] dO~ SHiP SEQ. MONITOR S~S ~L10E34 JUL-?9. *START* FILE: DSKBlVERi~Y.003<057>L107~O.5b0641 CREATED: PRINTED: 11-0CT-79 13~39~17 QUEUE S~I'ICHES: /FILE:f'ORT /CUPIES:I /$PACING:I /LIMI'r:122 /FORMS:NORMAL 1.651DAT~ 11-OCT-79 11-0CY-79 13:~8:01 13:38:51 PACIFIC COAST COMPUTING CENT ER 10706,56064 REEL HEADER REESNAME: ON NiUMBER:0I DATE: 79/10/10 APE HEADER LENGTH: 132~ BYTES TAPE NAME: 5'606:4 $ RViC~, NAME. EDIT TAPE:CONTiNUATION, NUMBER:' 01 C:OM~ENTS':~ ~ONiQOE WELL IDENTIFICATI. 0N=NUMBER I$~2032! .5 EOF FILE MEADE~ 1024 SYTES WELL alTE INffORMATION RECORD I.,ENGIH: 195 COMPANY: WELL: FIELD: RANGE: TOWN: SECTIO COUNTY STATE: N: SOHIO PETROLEUM COMPANY 0-10 (11-05-10-14) PRUDROE BAY lin NORTH S~OPE DA( ~"OR l~A T ~PkC 1~ ICA~I~ IUi'~ LENGTH: 850 BYTES EN'I'R~ BLOCKS: I 0 SIZ~ 1 REP CODE 66 0 DA~'U~ SPECI~ICAI~ON BbOCKS: EN~IRY lC TOOL SVORD# UNITS APl AP1 APl API FILE# SiZE EXP PROC SAM REP OEPT SHlf'T 1 DEPT 2 GH TAU TDT 5 $[GM TOT 6 NiTD IDT 7 N2TD TDT 8 N]TD TDT 9 F~TD TDT 10 fZ~'D TDT F3TD TDT 12 GR TDT 1] TAU TDT 14 TRAT IDT 15 3IGM TDT 16 N1TD N2TD TDT 18 N3TD TD~ 19 FITD TD~ 20 ~2TD TDT 21 ~TD 'IDT FT 0 0 0 0 0 4 0 0 1 68 0 0 GAPI 51 31 32 0 0 4 0 0 1 08 0 0 US 51 41 1 0 0 4 0 0 1 68 0 0 C/C 51 42 1 0 0 4 0 0 1 68 0 0 CU 51 40 ! 0 0 4 0 0 1 68 0 0 CPS 51 39 1 0 0 4 0 0 1 68 0 0 CPS 51 39 2 0 0 4 0 0 1 68 0 0 CPS 51 39 3 0 0 ~ 0 0 1 b8 0 0 CPS 51 39 1 0 0 4 0 0 I 68 0 0 CPS 51 39 2 0 0 ~ 0 0 1. 68 0 0 CPS 51 ]9 3 0 0 4 0 0 1 b8 0 0 GAPi 51 3i 32 0 0 4 0 0 1 68 0 0 US 51 4 1 1 0 0 4 0 0 I ~8 0 0 C/C 51 42 1 0 0 4 0 0 1 b8 0 0 CO 51 40 I 0 0 4 0 0 I 68 0 0 CPS 51 39 1 0 0 q 0 0 1 b8 0 0 CPS 51 19 2 0 0 4 0 0 1 68 0 0 CPS 51 39 3 0 0 4 0 0 I 68 0 0 CPS 5] 39 1 0 0 4 0 0 i 68 0 0 CPS 51 39 2 0 0 4 0 0 1 68 0 0 CPS 51 ]9 3 0 0 4 0 0 1 68 0 0 10785.000 10700.000 10600,000 10500.000 10+00.000 10300,000 10200,000 10100,000 MNEMONIC VALUe: GR 0,6O0 N1TD -4,004 i2TD -1,001 T~AT -0,005 N3TD -4,004 GR 18,b00 NITD 1351,351 f2TD 175,175 TRAT N3TD 572,573 GR 19.600 NITD 1345,345 ~'2TD 204.204 TRAT 2,620 N3TD b12.613 GR lb.400 N1TD 1301.301 F'2TD 261.261 TRAT 1.940 N3TD 608.609 GR , 28,000 N1TD 2058.058 ''D ~ 300 f2~ 30 N3IL) 644.645 MN EMUNiC V~ E MN~MUNiC VAbUE TAU -1.~B4 TRAT 0.000 N2TD -2.002 N3TD -4.004 ~'3TD 7.007 GR 0.500 5IGM 0.000 N1TO -4.004 F1TD -2.002 F2TD -2.002 IAU 230.818 r~RAT 3.230 N2TD 756.757 N3TD 200.200 ~3TD 36.036 GR 28.000 SIGN 19.550 NITD 1305.305 E'ITD 274.274 f'2TD 202.202 ~AU 273.333 TRAT 2.805 N2TD 810,811 N3TD 264.264 f3TD 42.042 GR 23.200 $1GM 16.900 NITD 1317.317 F1TD 297.297 F2TD 200.200 I'AU ~06.541 TRA~ 2.225 N2TD 822.823 N3TD 322.322 ~3TD 53.053 GR 20.200 SiGN 14.300 NITD 1272777. F1TD 386.386 F2TD 274.274 TAU 230.314 TRA2 2.905 N2TD 1203.203 N3TD 406.406 62.062 GB 28.300 t9,575 N1TO 1891.892 ~'ITD 420.:420 b2TD 261.261 TAU 291.:195 TRAT 2.b10 N2TD~: ~ ~1021.02! N3TD 436.436 ?0,070 GR 21.100 1'5i~72i5 NITD 1709.71 0 N3TD 666.667 FITD 432,432 F2TD 286.286 MNEMUNIC VAbU('~ SiGN 0,000 F1TD 0.000 TAU -1.132 N2TD -2.002 ~3TD -1.001 SIG~ 19.950 F1TD 271.271 ~AU 233.585 N2TD 906.907 f'3TD 70.070 S1GM lb.800 F1TD 3½8.318 TAU 2 3.082 N2TD 974.975 F3TD 64.064 SIG~ 15.025 F1TD 390.390 TAU 319.623 N2TD 918.919 F3TD 79.079 $1GM 19.900 F1TO 469,469 F3TD 86.086 GM 15.~25 ~TO : 403.403 AU 292,453 N2TD 1145,145 F3TD 88.088 GR 34.200 TAU 26 .799 MAT ~2,925 SIGN 3TO ! ~ i 492-'492 ~F1TD ~ ~4 30~:306 F3TD 87.087 GR 33,400 TA~ 278.616 : 8I~5i' ~ ~S'IGM 16-675 "'~-~'NiTD: 1,693'69'4 N2i~Di, I, I9i'191 I3TDv ' 672.6:'73 f'ITD 426.426 f'2iD 293.293 F3TD 97.097 GR 93.600 TAU 147.547 TROT 3.795 NITD 2718,718~ :i, ~N2TD:,~ :, 1613-6i4 N:3!ID :: 5i48-548 ~2~ 287,287 3~O 90,090 GR 102,900 TRAT 4~OOO!: :! SIGN 30:.:22.5 ::~ :~:'NtT:D 2504:,504 N3TD 770.771 f'ITD 416.416 F2TD 289.289 40.:000 TAU 130. 189 TRAT 5. 265 2558.558 N2TD, 1555,555 ::N3TD 584~584 . 3 724.725 ~1I 10000.000 ~R N3TO M1GM 31 200 F1TD IAU 152.075 2TD 15:7:7'5::77 F3TD 115.115 SIGM 35 300 FiTD: 344~34.4 TAU 137 484 N2TD :148i]48! 3I 87.087 D~PIH 9900.000 988~.500 ~NEh~ONiC GR N1TD f2TD TRAT N3TD N1TD F2TD TRAT N3TD VAL 176 5 740 0 -4 0 -0 -4 U~ .600 .356 . 1 "76 .835 .741 .bOO .004 .000 .010 .004 EMUNIC ~AU N2TD ~3TD SIGM F1TD TAU N2TD F3TD SIGM ~'ITD 116.855 1469.469 75.075 39.350 282.282 -1.132 -4.004 -2.002 0.O5O -2.002 MNEMONIC NiTD ~21D N3TD N1TD ~2TD VADU~ 6.020 594.594 65.000 2332.332 199.199 -0.005 -2.002 0.600 -4.004 -1.001 MNEMUNIC SlGM F1TD TAU N2TD ~3TD 8IGM F1TD TAU N2TD FBID VAbUE 39.475 280.280 117.862 1527.527 128.128 0.075 0.000 -0.881 0.000 0.000 S( IARY Ut DATA RkC[,JRDS NIJNB~R O~' RECURDS: 151 LENGTH OF RECORDSI i014 BYTES LENGTH DE LAST RECORD: 174 FILE TRAILER LENGTH: 62 BYTES fILE NAME: EDIT .001 MAXIMUM PHYSICAL RECORD LENGTH: NEx'r ~iLE NAMk: 1024 B~TES E 0 F FILE HkADER LENGTH: 62 BYTES ~!LE NAME. EDIT .002 · MAXIMUM PHYSICAL RECORD LENGTH: PREV AME: PASSTHREE 1024 BITES WELL SITE INFORMATION RECQRD LENGIM:I 195. BXTE6 CO:~PA:N:¥ :: "~ h~ ~EL . FiELD~ SOHIO: PETROLEUM COMP:~NY B lO ( .... 1 05-.10-14) PRU DH:OE 'BAY STAT~: lin ,ALASKA DATA ~OBMAT SPECIfICATiON 6BNGT~: 450 ~¥TE$ ~N~R~ BLOCKS: TYPE 0 SIZE REP CODE i 66 DA( I SPECIFICAI:IuN EflTR~ lC ~OOL 1 DEPT 2 GN ~U TDT 4 T~AT 5 SIG~ TDT N1ZD TDT ? N2TD TDT 8 N]TD TDT 9 ~ITD TDT I0 ~ITD TDT 11 TD TDT SVORD# UNITS API APl AP1 APl FILE# SIZE EXP PROC SAM RSP DEPT SHIFT FT 0 0 0 0 0 q O 0 I 68 0 0 GAPI 51 31 32 0 0 4 0 0 1 ~8 0 0 US 51 41 I 0 0 4 0 0 1 68 0 0 C/C 51 42 1 0 0 q 0 0 1 68 0 0 CO 51 40 1 0 0 4 0 0 1 68 0 0 CPS 51 ]9 1 0 0 4 0 0 1 68 0 0 CPS 51 ]9 2 0 0 4 0 0 ! 68 0 0 CPS 51 39 3 0 0 4 0 0 I 68 0 0 CPS 51 ]9 1 0 0 4 0 0 I 68 0 0 CP~ 51 39 2 O 0 4 0 0 1 68 0 0 CPS 51 ]9 ] 0 0 4 0 0 1 68 0 0 D~PTH 10785,000 10700.000 10600.000 10500°000 10400,000 10300.000 10200,000 10100.000 10000,000 9900.000 9884.5OO MNEMONIC VALUE MNkMONiC VALUE MNLMUNIC VALUk MNEMONIC $IGM F1TD GR 0.500 N1TD 708.709 f2TO 210.210 ~Ab 698.490 N2TD 548.548 F3TD 176.176 2RAT 0.105 l~]TO 554.554 GR 30.800 1AU 229 NITD 1309.309 N2TO 1015 f2TO 200.200 f3TO 81 ,811 .015 ,081 VALUE 4.700 246.246 GR 26.500 ~AU 283 NITD 1299.299 N2TD 966 f'2TD 220.220 F3TO 8,~ TBAI 3.135 $1GM 20.100 N3TD 088.689 F1TD 268.268 SIGM F1TD GR 24.800 N1TD 1293.293 F2TD 254.254 'tAU ]20 N2TD 994 f3TD 78 .596 ]?RAI 2.740 .g67 N3TD 700.701 .083 TRAI' 2,0~5 N]TD 720.721 $iGM ~ITD GR 31.300 'fAO 221 NITD 2222.222 N2TD 1501 ~2TD 30u.306 ~3TD 104 .126 .995 .078 16.150 278.278 GR 27.200 TAU 280 NITD 1839.840 N2TD 1303 f2IO 309.309 F3TD 100 .258 .501 ,104 14.350 355.355 TRAT 2.900 6IGM 20.875 m.3TD 796,797 F1TD 462.462 GR 33.300 TAU N1TO 1705.706 N2TD f'2TD 312.312 f3TD .126 .303 .100 IRAI 2.570 N3TD 764.765 $1GM F1TD 281.132 1945.245 102.102 TRAT 2,735 N~TD 772.77~ GR TAU 149.560 N1TD N2TD 1679'680 f2TO 302.302 F3TD 122.122 ::4~.800 TAU 2442'442 N2TD 204.204 ~'3TD SIGM F1TD ~-2TD 16.525 446.446 16.475 415.415 ~RAI 3.940 SIGS 30.850 N]TD 820.821 FITD 436.436 5.445 $iGM 796~797 F1TD ' T OR 69.800 : AU 138 TRAT 6.025 SIGM N1TD : :2190'190 N2TD ~459 N3TD 816.81:7 FITD ~'2TD 190.190 F3TD 91.091 N1TD :00'2 N2TD -2.002 -4.004 FIT ~2TD -1.001 ~ lTD -2.002 34.125 312.312 0.100 '2.002 NUMBER OF ~ECORDS: 79 LENGTH O~' RECORDS: 101@ B~TE8 LENGT~ U~ LAST RECURO: 358 B~IES FILE I~RA 1LEE 1024 BYTES LENGTH: 62 BYTES FILE NAME: EDiT .002 MAXIMUM PHYSICAL BECORD LENGTH: NEXT FILE NAME: EOF FILE HEADER LENGTH: 62 BYTES fILE ~AME. EDIf .003 . M:AXIMU~ PH~:SlCAL RECORD LENGTH. 1024 BYTE8 PREVIOUS ~',ILE NAME: FILE COMMENTS PASS FOUR AND PASS FiVE ~E!.~L SITE !NI;i3RMATiON RECORD bENG!{~i: 195. ~ANGk: DOWN.', S E C T i.IL) N: C O:UNT ¥ :: STATE: SOHIO PETROLEUM COMPANY B.10:~11-0 -10-14) PRUDHOE~:BA:~ ALASKA /O DAIA ~ORMAT SPkCi~iCA~£1ON LENGIH: 850 EN'IRY 8LOCKS: 0 $1Zk ~{EP CODE ENTRY 1 bb 0 DA I SPECIf'ICAIION 5briCkS| ENTRY lC TOOL 2 GR lOT TAU IDT TRAT 'IDT 5 $1GM TD~ 6 N1TD 7 N2TD TOT 8 N~TD TDT 9 ~ITD.TDT 10 ~2TD TOT 11 ~]TD TDT 12 GR TDT TAU TDT T~AI TOT SIGM TDT lb N1TD TDT 17 N2TD TOT 18 N3TD TDT 19 F1TD TDT 20 P2TD TDT 21 F~TD TDT SVORD# UNITS APl API AP1 AP1 Fi6E~ $IZk EXP PROC SAN REP DEPT SHIFT FT 0 0 0 0 0 4 0 0 I 68 0 0 GAP1 51 31 32 0 0 4 0 0 1 68 0 0 U8 51 41 1 0 0 4 0 0 1 68 0 0 C/C 51 42 I 0 0 4 0 0 1 68 0 0 CU 51 40 1 0 0 4 0 0 1 68 0 0 CPS 51 39 1 0 0 4 0 0 1 ~8 0 0 CPS 51 ~9 2 0 0 4 0 0 1 68 0 0 CPS 51 ]9 3 0 0 4 0 0 1 68 0 0 CPS 51 39 1 0 0 4 0 0 I 68 0 0 CPS 51. 39 2 0 0 4 0 0 I 68 0 0 CPS 51 ]9 3 0 0 4 0 0 1 b8 0 0 GAPI 51 31 32 0 0 4 0 0 I 68 0 0 US 51 41 1 0 0 4 0 0 1 68 0 0 C/C 51 42 1 0 0 q 0 0 1 u8 0 0 C~ 51 40 1 0 0 4 0 0 1 68 0 0 CPS 51 39 1 0 0 ~ 0 0 1 68 0 0 CPS 51 ]9 2 0 0 4 0 0 1 b8 0 0 CPS 51 39 3 0 0 ~ 0 0 1 68 0 0 CPS 51 39 I 0 0 4 0 0 1 68 0 0 CPS 51 39 2 0 0 4 0 0 1 68 0 0 CPS 51 ]9 ] 0 0 4 0 0 1 68 0 0 DkPTB 10785.000 10700.000 10600.000 10500.000 1040.0.000 1,0300.000 10200.000 10100.000 10000.000 MNEMLINIC VALUk NNkMUNiC VAL~UE MNkNONIC VALUE MNEMONIC VALUE GR 0.bO0 1AU -0.629 TRAI -0.010 SIGN 0.000 NITS -6.006 N2TD -4.004 N3TD -4.004 F1TD 0.000 ~2TD 0.000 F'3TD -1.O01 GR 0.600 TAU 362.641 TRAX -0.010 SIGN 10.700 N1TD 848.849 N2TD 670.671 N3TD b]8.639 ~'ITD 212.212 F2TD 198.198 f'3TD 154.154 GR 29.700 TAU 235..14b TRA'f 2.930 SiGN 19.675 N1TD 1325.325 N2TD 1041.041 N3TD 754.755 FI~D 266.266 f"2TD 200.200 fITS 80.080 GR 36.800 TAU 23b.101 TRAT 2.865 SIGN 20.675 N1TD 1333.33] N2TD 1063.06] N]TD 804.805 F!TD 289.289 f2TD 190.190 F3~D 92.092 GR 26.500 'fAO 276.855 TRA'I 2.845 SIGN 16.650 N1TD 1389.389 N2TD 1061.O61 N3TD 77~.773 FITS 282.282 f2TD 200.200 ~3TD 84.084 GR 29.600 TAU 279.119 TRAX 2.870 $iGM 16.575 N1TD 1381.381 N2TD 1093.093 N3TD 776.777 fITS 293.293 f2TO 205.205 FITS 84.084 GR 24.800 '£AU 325.918 'I'RAT 2.000 SIG~i 14.075 N1TD 1229.229 N2TD 964.965 NJTO '750.751 F1TD 350.350 ~2TD 254.25~ F3TD 88.088 GR 27 ~00 TAU 319~.371 TRAT 2.060 SIGN 14.450 N1TD 1279:-79 N2TD 104-.043 NJTD 768.769 FITS 353.35,~ ~2TD 247.247 F3TD 80.080 GR 3'7.700 fAg 240,880 TRAX 3.105 SiGN 19.075 N1TD 1921.922 N2TD 1311.]11 N]%;D 768.769 F1TD 411.411 235.849 F2TD 29~ 294 F3TD 97.097 GR 36.100 2'A~ TRAX ' ~870 SIGM 19.525 NiTS 1965.966 N2~D 1367.367 N3TD 828.829 ~ITD 410.410 ~2TD 290.290 F3TD 96.096 GR .30,400 IAU 289. 434 SIGN N1TD 1655.656 N2TD 126!.267 FITD GR 32.300 TAU 284.906 N1TD ~725.726 N2TD 1~53.253 N3TD 828.829 F1TD 439.439 ~2TD 312.312 F3TO 107.107 N3TD .39.700 TAU 269. ~RAT ~. )5 SIaM 17.175 1909,910= N2TO: ~ I3792 ~38' )9 FIlD 446,:'44~ 32~,326 ~3TD 119,119 GR~ 44.500 TAU 2~ .7)0: ~ SiGN ~ ~7'200 ~~ N'I~D 1879.880 N2TD 13~ 828.829 ~1 O : 444..444 [2ID 327:.327 f'3TD 115.115 2TS [~2T :279 279 f3XD N~TD 950. 951 [~ lTD 152.075 ~RAT 3 845 61GM 30.475 1653'65'4 N:3TD ~ 844~8:45~ ~ ~P'liTD: ~ ; 414.414 1]~.124 Oh ~ 91.700 TAU 143.522 . '075 : :N<I~D 2904.905 N~TD 1855.856 458.458 F2TD 319.319 F3TD 142.142 N3TD 50.000 ~'AU 140.000 2~0:~;~04 N2TD 1511.511 202.202 f3TO i02 75 852.853 F1TD, ]12.J12 TRAX GR NITS f2TD 5,480 SIGM 32.925 844.8:45 F1TDi :314'3t4 220.220 F3TD 101.101 9900.000 9884.500 MNEMUN lC GR N lTD P 2TO TRAT N3TO GR N1. TD F2TD TRAT N3TD VALUE 74.000 360.360 32.032 5.945 424.424 0.600 -4.004 -1.001 0.000 -4.004 ¸MN TAU N2TD ~ 3TD SIGM F1TO TAU N2TD ~3TD S1GM FITO -0.377 27b.276 26.026 36.800 140.146 -0.377 0.000 -1.001 0.O00 -2.002 MNEMONIC N]TD GR N1TD F2TD IMAT N]TD N1TD ~'2TD VALUE 5.895 142.142 74.100 1133.133 110.110 -0.010 -4.004 0.000 -4.004 -2.002 MNEMONIC $iGM FITD TAU N2TD F3TD 81GM F1TD N2TD FOTD VALU~~ 11.900 44.044 -0.377 866.867 87.087 0.100 -1.001 -1.887 -4.004 -2.002 /? SUMMARY O~ DATA R~CORDS NUMOER OF RECORDS: 151 LENGTH O~ RECORDS: 1014 B~TES LENGTH 01; LAST RECURO: 174 B~I'ES fILE T~AILER LENGTH: 62 BYTES f'iLE NAME: EDIT .003 ~AXIMUM PHYSICAL RECORD LENGTH: NEXT FILE NAME: EOF 1024 B~TE$ '~APE TRAILER LENGTH: 1]2 BYTES TAPE NAME: 56064 SERVICE NAME. TAPE CONTINUATION NUMBER: Ol NEXT TAPE NA~E. C(3g~ENT$:: UNIQUE WELL IDENTI~"ICATION NUMBER IS DATE: 79/~0/10 B- 10 R~.GE%VEO . PRUDHOE BAY oc~ ~,~ /~a Oil & Oas Cons. Oommission Anchorage :::::::::::::::::::::: :::::1:::::<: :::::::::::::::::::::::::: . . ..... :: ................. .~'~ ' -'~J: ...... "}:~ ',¢ ....... "* · ::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::~:i::..:;:::~:~:~ ...................... ;:::~t: ........... ::::::::::::::::::::::: ......... , ...... ~,.[~.. .............. :::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::: ...~ .............. ::::::::::::::::::::::::: ~:::::::::;:: ::::::::::::::::::::::::::: .................... ~.;., =================================================== ====================================================== .......... ~....~ ................. · .......... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ..... , ....... ,., .................... i ............. ~.:.~:,::::::::: ........ ,. ;. - Run 1' 13 - September - 1996 CNIGR Cased Hole WE~E~ ATLAS 99§0' 10393' Logging Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY 1/NIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION ~DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD B - 10 500292032100 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 26-SEP-96 4468.07 D. BARBA E. KRUMANOCKER 31 liN 14E 2069 1611 64.29 0.00 0.00 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 10011.0 3RD STRING 7.000 11100.0 PRODUCTION STRING 4.500 10343.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 20-SEP-78 SWS BASELINE DEPTH 10028.5 10061.5 10071.5 10088.5 10094.0 10095.0 10095.5 10096.5 10097.5 10105.5 10106.0 10108.5 10112.0 GRCH 10028.5 10061.5 10071.5 10087.5 10095.0 10096.0 10097.0 10098.0 10098.5 10106.5 10107.5 10110.0 10114.0 EQUIVALENT UNSHIFTED DEPTH 47.00 26.00 12.60 10114.0 10115.0 10116.0 10116.5 10117.5 10118.5 10119.5 10120.0 10121.0 10126.5 10127.0 10129.0 10129.5 10136.5 10137.5 10139.5 10147.5 10148.0 10149.0 10150.5 10151.5 10152.0 10152.5 10159.0 10166.0 10171.0 10195.5 10204.0 10239.5 10268.5 10292.5 10303.5 10319.0 10346.0 10360.5 10371.5 10386.0 $ REMARKS: 10116.0 10116.5 10117.5 10118.5 10119.5 10120.0 10120.5 10121.0 10121.5 10127.0 10128.0 10130.0 10131.0 10138.0 10138.5 10140.5 10149.5 10150.5 10151.5 10152.0 10152.5 10153.0 10154.0 10160.5 10167.5 10172.0 10195.0 10205.0 10239.5 10268.0 10291.5 10301.5 10319.5 10346.5 10360.5 10371.5 10387.5 CN/GR Cased Hole. TIED INTO BHCS DATED 15-0CT-78. NEUTRON LOG PARAMETERS: LIMESTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. /??MATCH1A.OUT FILE HEADER FILE NIIMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9921.0 2418 9930.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH NPHI 10028.5 10028.5 10061.5 10061.5 10071.5 10071.5 10088.5 10087.5 10094.0 10095.0 10095.0 10096.0 10095.5 10097.0 10096.5 10098.0 10097.5 10098.5 10105.5 10106.5 10106.0 10107.5 10108.5 10110.0 10112.0 10114.0 10114.0 10116.0 10115.0 10116.5 10116.0 10117.5 10116.5 10118.5 10117.5 10119.5 10118.5 10120.0 10119.5 10120.5 10120.0 10121.0 10121.0 10121.5 10126.5 10127.0 10127.0 10128.0 10129.0 10130.0 10129.5 10131.0 10136.5 10138.0 10137.5 10138.5 10139 . 5 10140 . 5 10147 . 5 10149 . 5 10148 . 0 10150 . 5 10149.0 10151.5 10150.5 10152.0 10151.5 10152.5 10152.0 10153.0 10152.5 10154.0 10159.0 10160.5 10166.0 10167.5 10171.0 10172.0 for each run in separate files. STOP DEPTH 10385.0 10394.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 10195.5 10204.0 10239.5 10268.5 10292.5 10303.5 10319.0 10346.0 10360.5 10371.5 10386.0 $ REMARKS: 10195.0 10205.0 10239.5 10268.0 10291.5 10301.5 10319.5 10346.5 10360.5 10371.5 10387.5 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B. OUT $ : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH' 2418 68 1 GAPI 4 2 NPHI 2418 68 -1 PU-L 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 21 Tape File Start Depth = 10410.000000 Tape File End Depth = 9910.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5006 datums Tape Subfile: 2 224 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate PASS NUMBER: 2 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - 0.5000 START DEPTH STOP DEPTH 9941.0 10385.0 9950.0 10394.0 PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 9941.0 9938 . 0 9943.0 9940.0 · 9946.5 9946.0 9948 . 5 9948 . 0 9949.0 9949.0 9952.5 9952.5 9953.0 9953.5 9954.0 9954.5 9965.0 9966.5 9966.5 9975.5 9975.5 9976.5 9976.0 9979.0 9978.5 10012.5 10012.5 10018.5 10028.5 10056.5 10056.5 10057.5 10057.0 10061.0 10060.5 10061.5 10061.5 10071.5 10074.5 10074.5 10076.5 10075.0 10077.5 10075.5 10078.0 10076.5 10079.0 10077.5 10079.5 10078.5 10088.5 10087.5 10089.5 10088.0 10091.5 10090.0 10094.0 10095.0 10095.5 10096.5 10097.5 10098.5 10099.5 10104.0 10105.0 files. (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 9963.5 10018.0 10028.5 10061.5 10071.5 10087.5 10095.0 10096.0 10097.0 10098.0 10098.5 10104.5 10105.5 10106.0 10108.5 10112.0 10114.0 10115.0 10116.0 10116.5 10117.5 10118.5 10119.5 10120.0 10121.0 10126.5 10127.0 10129.0 10129.5 10136.5 10137.5 10139.5 10146.5 10147.5 10148.0 10148.5 10149.0 10150.5 10151.5 10152.0 10152.5 10156.5 10157.0 10159.0 10160.0 10166.0 10167.0 10168.0 10171.0 10178.0 10186.5 10195.5 10197.5 10198.0 10202.0 10202.5 10203.5 10204.0 10204.5 10205.5 10208.5 10209.0 10209.5 10223.0 10224.0 10239.5 10244.5 10245.5 10248.0 10248.5 10249.0 10106.0 10119.0 10119.5 10140.5 10148.0 10150.0 10157.5 10159.0 10162.0 10168.0 10168.5 10178.5 10186.0 10197.0 10198.0 10202.0 10203.5 10204.5 10205.0 10206.0 10208.5 10209.0 10210.0 10223.5 10224.0 10244.5 10245.0 10247.5 10248.0 10248.5 10106.5 10107.5 10110.0 10114.0 10116.0 10116.5 10117.5 10118.5 10119.5 10120.0 10120.5 10121.0 10121.5 10127.0 10128.0 10130.0 10131.0 10138.0 10138.5 10140.5 10149.5 10150.5 10151.5 10152.0 10152.5 10153.0 10154.0 10160.5 10167.5 10172.0 10195.0 10205.0 10239.5 10258.5 10259.5 10268.5 10286.5 10287.0 10287.5 10288.5 10292.5 10294.0 10295.0 '10298.5 10300.0 10302.5 10303.5 10304.0 10308.0 10308.5 10311.0 10317.5 10319.0 10320.5 10321.0 10332.0 10333.0 10334.0 10334.5 10346.0 10351.0 10352.0 10358.5 10359.5 10360.5 10363.5 10364.0 10367.0 10368.0 10370.0 10370.5 10371.~0 10371.5 10372.5 10378.0 10378.5 10386.0 10387.5 10388.0 $ REMARKS: 10258.0 10258.5 10268.0 10285.5 10286.5 10287.0 10287.5 10291.5 10293.0 10293.5 10297.0 10298.0 10300.5 10301.5 10302.5 10306.5 10307.5 10310.0 10317.5 10319.5 10320.5 10321.5 10332.5 10333.0 10334.0 10335.0 10346.5 10351.5 10352.0 10358.5 10359.0 10360.5 10363.0 10364.0 10367.0 10367.5 10369.5 10371.0 10372.0 10372.5 10371.5 10373.0 10378.5 10380.0 10387.5 10389.0 10389.5 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN / ? ?MATCH2A. OUT / ? ?MATCH2B. OUT $ : BP EXPLORATION : B - 10 : PRUDHOE BAY : NORTH SLOPE (ALASKA) STAT * FORMAT RECORD : ALASKA (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS * DATA RECORD (TYPE# 0) Total Data Records: 21 1006 BYTES * API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 Tape File Start Depth = 10410.000000 Tape File End Depth = 9910.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5006 datums Tape Subfile: 3 198 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER .. FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9941.0 2418 9950.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS .PBU CURVE CODE: GRCH PASS NIIMBER: 1 for each run in separate files. STOP DEPTH 10385.0 10394.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9945.5 9944.5 9952.5 9951.5 9950.0 9973.0 9972.5 9976.5 9976.0 9977.5 9976.5 9985.5 9984.0 10019.5 10018.5 10022.5 10021.0 10023.0 10022.0 10026.0 10025.0 10027.0 10025.5 10029.0 10027.5 10032.0 10032.0 10032.5 10032.5 10034.0 10033.5 10056.0 10055.5 10057.0 10056.0 10058.0 10057.0 10058.5 10058.0 10060.0 10059.5 10061.0 10060.0 '10065.5 10064.5 10066.0 10065.5 10067.0 10066.5 10075.0 10074.0 10078.0 10075.0 10078.5 10075.5 10079.5 10076.0 1-0080.0 10078.0 10082.5 10080.5 10081.5 10083.0 10081.5 10083.5 10082.0 10085.5 10084.0 10086.5 10084.5 10091.5 10089.5 10090.0 10093.0 10092.5 10095.5 10095.0 EQUIVALENT UNSHIFTED DEPTH NPHI 10096. 10099. 10099. 10100. 10102. 10102. 10104. 10105. 10108. 10108. 10112. 10113. 10115. 10116. 10117. 10118. 10118. 10120. 10123. 10124. 10126. 10127. 10130. 10134. 10135. 10136. 10136. 10138. 10142. 10150. 10151. 10152. 10153. 10154. 10157. 10157. 10158. 10159. 10160. 10161. 10165. 10166. 10167. 10168. 10169. 10176. 10180. 10183. 10185. 10189. 10190. 10190. 10192. 10192. 10193. 10194. 10195. 10196. 10197. 10197. 10098.5 10101.5 10102.5 10104.5 10105.5 10113.0 10113.5 10126.5 10127.5 10136.0 10136.5 10157.0 10158.5 10162.5 10167.0 10168.0 10168.5 10182.5 10184.5 10189.5 10191.5 10195.5 10196.5 10096.0 10099.5 10100.5 10108.5 10109.5 10116.0 10116.5 10117.5 10118.0 10119.0 10120.5 10123.0 10123.5 10126.0 10127.0 10130.5 10134.5 10136.5 10137.5 10139.5 10142.5 10152.0 10153.0 10153.5 10154.0 10154.5 10158.0 10158.5 10159.5 10160.5 10165.5 10166.5 10167.5 10177.0 10178.5 10188.0 10189.0 10191.0 10192.0 10192.5 10193.0 10194.5 10195.0 10196.0 10199 10200 10200 10203 10204 10210 10210 10211 10211 10212 10213 10213 10214 10215 10216 10224 10225 10231 10232 10235 10240 10243 10244 10259 10259 10260 10260 10261 10267 10276 10277 10277 10278 10291 10292 10294 10295 10303 10305 10306 10310 10311 10317 10321 10346 10355 10356 10359 10360 10362 10370 10371 10378 10378 10382 10387 10388 $ REMARKS: .0 .0 .5 .5 .0 .0 .5 .0 .5 .0 .0 .5 .5 .5 .5 .0 .5 .5 .0 .5 .5 .0 .0 .0 .5 .0 .5 .0 .0 .0 .0 .5 .5 .0 .0 .0 .0 .0 .5 .0 .5 .5 .0 .0 .5 .5 .5 .0 .0 .0 .0 .5 .0 .5 .0 .5 .0 PASS . 10199.0 10200.0 10203.0 10204.0 10211.0 10211.5 10212.5 10213.5 10215.5 10216.0 10231.0 10232.0 10235.5 10240.0 10242.5 10243.0 10258.0 10258.5 10259.0 10259.5 10274.5 10275.0 10276.0 10289.5 10290.0 10292.0 10292.5 10303.0 10304.0 10308.5 10316.5 10355.0 10355.5 10358.0 10358.5 10361.0 10369.0 10371.5 10378.0 10380.0 10389.0 10389.5 10198.0 10211.5 10212.0 10212.5 10215.5 10216.0 10226.0 10227.5 10257.5 10265.0 10278.0 10302.0 10310.0 10321.0 10346.5 10382.0 FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH3A. OUT / ? ?MATCH3B. OUT $ : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TaPe depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-L 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 21 Tape File Start Depth = 10410.000000 Tape File End Depth = 9910.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10012 datums Tape Subfile: 4 209 records... Minimum record length: Maximum record length: 26 bytes 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth Shifted and clipped curves PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9941.0 2418 9950.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 9941.0 9943.5 9946.5 9949.0 9949.5 9951.0 9952.0 9953.0 9972.0 9973.5 9974.5 9975.0 10019.5 10028.5 10029.5 10030.0 10038.0 10038.5 10043.0 10043.5 10047.0 10055.0 10055.5 10057.5 10069.5 10070.5 10072.5 10073.0 10074.0 10074.5 10075.0 10078.5 10079.5 10080.0 10081.5 10082.0 10083.0 GRCH 9937.5 9940.0 9945.5 9948.0 9949.0 9951 9952 9972 9973 9974 .5 .0 .5 .0 .0 10042.0 10043.0 10046.5 10053.5 10054.5 10072.0 10072.5 10073.5 10077.5 10078.0 for each run in separate files. STOP DEPTH 10385.0 10394.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 9951.5 9972.5 10019.5 10027.0 10027.5 10028.0 10038.5 10039.0 10056.5 10068.5 10069.0 10071.0 10072.0 10073.0 10073.5 10078.5 10081.0 10081.5 10082.0 10084.0 10084.5 10085.5 10086.5 10089.5 10090.5 10091.0 10097.0 10097.5 10098.0 10098.5 10099.5 10100.5 10101.5 10102.0 10104.0 10104.5 10106.5 10108.0 10108.5 10112.5 10113.5 10116.0 10117.0 10117.5 10118.0 10118.5 10119.0 10120.0 10123.0 10126.0 10126.5 10128.0 10128.5 10130.0 10131.0 10131.5 10134.0 10135.0 10136.0 10136.5 10137.5 10138.5 10139.5 10140.0 10146.0 10147.0 10148.0 10149.5 10150.5 10151.0 10151.5 10152.5 10153.0 10154.0 10161.0 10165.0 10166.0 10166.5 10167.5 10084.0 10084.5 10087.5 10088.0 10088.5 10098.5 10100.5 10101.0 10102.0 10104.0 10105.0 10108.5 10109.5 10113.5 10114.0 10118.0 10118.5 10128.0 10129.0 10134.5 10135.0 10136.0 10137.0 10139.0 10139.5 10140.5 10161.5 10166.5 10167.5 10082.5 10083.0 10083.5 10087.5 10097.5 10098.0 10100.0 10100.5 10101.0 10101.5 10103.0 10107.0 10116.5 10117.0 10117.5 10118.0 10119.5 10120.5 10123.0 10126.0 10127.0 10130.5 10131.0 10131.5 10137.0 10138.5 10146.5 10147.5 10148.0 10149.5 10151.5 10152.5 10153.0 10153.5 10154.0 10154.5 10165.5 10166.0 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 !0 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 '10 10 10 10 10 10 10 10 168.5 175.0 175.5 176.0 177.0 178.0 179.0 180.0 185.0 186.5 189.0 190.0 190.5 192.5 193.5 195.0 197.0 197.5 202.0 202.5 205.0 209.0 216.5 217.5 230.5 231.5 232.0 233.0 233.5 234.0 234.5 236.0 237.0 237.5 238.5 240.5 241.5 242.0 242.5 243.0 244.5 245.0 245.5 247.0 260.0 261.0 261.5 267.5 268.0 269.0 274.0 275.0 277.0 281.0 291.0 292.0 294.0 295.0 303.5 306.0 10168.0 10177.5 10185.5 10188.0 10188.5 10195.5 10196.5 10201.0 10202.0 10204.5 10209.0 10216.5 10217.0 10231.0 10232.0 10233.5 10238.0 10241.5 10242.0 10243.5 10244.0 10244.5 10259.0 10259.5 10260.5 10267.0 10267.5 10272.5 10273.0 10275.0 10279.5 10289.5 10290.0 10292.0 10292.5 10303.5 10175.0 10176.0 10176.5 10177.0 10178.5 10179.0 10184.0 10190.0 10192.0 10192.5 10193.0 10195.0 10230.5 10233.0 10233.5 10234.5 10236.0 10236.5 10237.5 10240.5 10241.0 10241.5 10242.5 10246.5 10260.0 10266.0 10302.5 10306.5 10309.0 10309.5 10310.5 10314.5 10317.0 10331.5 10337.5 10338.5 10339.0 10358.0 10358.5 10359.0 10359.5 10361.5 10364.5 10365.5 10366.0 10366.5 10367.5 10368.5 10369.0 10369 .'5 10370.0 10378.0 10378.5 10382.5 10387.5 10388.0 $ REMARKS: 10304.5 10307.0 10308.0 10309.0 10314.0 10316.5 10331.0 10337.0 10337.5 10338.5 10357.5 10357.5 10358.0 10359.0 10361.0 10363.5 10364.0 10364.5 10365.5 10366.5 10367.0 10367.5 10368.5 10370.0 10378.0 10380.0 10382.5 10389.0 10389.5 PASS 4. FUCT & NUCT WERE SHIFTED WITH NPHI. / ? ?MATCH4A. OUT / ? ?MATCH4B. OUT $ CN : BP EXPLORATION WN : B - 10 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units GRCH 2418 68 1 GAPI NPHI 2418 68 1 PU-L FUCT 2418 68 1 CPS (ALASKA) Size API API API API Log Crv Crv Length Typ Typ Cls Mod 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 * DATA RECORD (TYPE# Total Data Records: 0) 1006 BYTES * 21 16 Tape File Start Depth = 10410.000000 Tape File End Depth = 9910.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10012 datums Tape Subfile: 5 Minimum record length: Maximum record length: 241 records... 26 bytes 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH '2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3, 4 1, 2, 3, 4 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 4 PASSES. $ : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-L 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 21 Tape File Start Depth = 10410.000000 Tape File End Depth = 9910.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15018 datums Tape Subfile: 6 44 records... Minimum record length: 26 bytes Maximum record length: 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9920.0 2418 9929.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SBAR PCM GR CN $ SWIVEL S INKER BAR PCM/CCL GAMMA RAY STOP DEPTH 10397.5 10406.5 COMPENSATED NEUTRON 13-SEP-96 FSYS REV. J001 VER. 1.1 1444 13-SEP-96 10604.0 10395.0 9950.0 10393.0 900.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT): 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER 'CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE ToP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS) : 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-L 4 3 CN. 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 · 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 71 Tape File Start Depth = 10410.000000 Tape File End Depth = 9914.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27878 datums Tape Subfile: 7 Minimum record length: Maximum record length: 147 records... 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9941.0 2418 9950.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 10396.5 10405.5 13-SEP-96 FSYS REV. J001 VER. 1.1 1519 13-SEP-96 10604.0 10395.0 9950.0 10393.0 900.0 YES TOOL STRING (TOP T© BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : LOGGER' S CASING DEPTH (FT) : 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 69 Tape File Start Depth = 10409.000000 Tape File End Depth = 9929.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 32308 datUms Tape Subfile: 8 Minimum record length: Maximum record length: 145 records... 62 bytes 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9940.0 2418 9950.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 10396.5 10405.5 13-SEP-96 FSYS REV. J001 VER. 1.1 1549 13-SEP-96 10604.0 10395.0 9950.0 10393.0 900.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : LOGGER' S CASING DEPTH (FT) : 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD. (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 2 ~CNC 2418 3 CN 2418 4 LSN 2418 5 SSN 2418 6 CCL 2418 7 SPD 2418 8 TEN 2418 68 1 GAPI 4 68 1 PU-L 4 68 1 PU-L 4 68 1 CPS 4 68 1 CPS 4 68 1 4 68 1 F/MN 4 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636' 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 69 Tape File Start Depth = 10409.000000 Tape File End Depth = 9929.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary:, Rep Code: 68 45168 datums Tape subfile: 9 Minimum record length: Maximum record length: 145 records... 62 bytes 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9941.0 2418 9950.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 10396.5 10405.5 13-SEP-96 FSYS REV. J001 VER. 1.1 1619 13-SEP-96 10604.0 10395.0 9950.0 10393.0 900.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : 0.000 11100.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER~ FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 4. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B - 10 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 69 Tape File Start Depth = 10410.000000 Tape File End Depth = 9930.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 49598 datums Tape Subfile: 10 Minimum record length: Maximum record length: 145 records... 62 bytes 1014 bytes Tape Subfile 11 is type: LIS 96/ 9/26 O1 **** REEL TRAILER **** 96/ 9/26 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 26 SEP 96 3:40p Elapsed execution time = 3.89 seconds. SYSTEM RETURN CODE = 0 * ALASKA COMPUTING CENTER * . ****************************** . ............................ . * ....... SCHLUMBERGER ....... * . ............................ . ****************************** COMPANY NAME : BP EXPLORATION (ALASKA), INC. WELL NAME : B- 10 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292032100 REFERENCE NO : 98263 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/06/ 2 ORIGIN : FLIC REEL NAME : 98263 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20231-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/06/ 2 ORIGIN : FLIC TAPE NAME : 98263 CONTINUATION # : 1 PREVIOUS TAPE : COF~4ENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20231-00 TAPE HEADER Prudhoe Bay CASED HOLE WIRELINE LOGS WELL NAME: B-10 API NUMBER: 500292032100 OPERATOR: BP Exploration (Alaska), Inc. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 2-JUN-98 JOB NUMBER: 98263 LOGGING ENGINEER: S. Morrison OPERATOR WITNESS: A Coleman SURFACE LOCATION SECTION: 31 TOWNSHIP: liN RANGE: 14E FNL: 2070 FSL: FEL: 1611 FWL: ELEVATION (PT FROM MSL O) KELLY BUSHING: 64.29 DERRICK FLOOR: GROUND LEVEL: 37.24 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) .............................................. 1ST STRING 8.500 7. 000 11100.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 10364.5 10344.5 10336.5 10333.0 10331.5 10330.5 10316.0 10290.5 10290.0 10274.5 10264.0 102 63.5 10229.5 10228.5 10225.0 10224.5 10204.5 10204.0 10199.5 10183.0 10177.5 10174.0 10172.5 10171.5 10169.0 10168.5 10164.5 10164.0 10137.5 10123.5 10120.5 10119.0 10109.5 10095.0 10093.5 10078.5 10076.5 10070.5 10067.5 10064.5 10064.0 10061.0 10060.5 10055.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88890.5 88890.5 10367.0 10367.0 10346.5 10346.5 10338.0 10338.0 10334.5 10334.5 10332.5 10332.5 10330.0 10330.0 10318.0 10318.0 10291.5 10292.0 10274.5 10275.0 10265.0 10265.0 10229.5 10229.5 10225.0 10224.5 10203.5 10203.5 10199.5 10200.0 10182.5 10182.5 10178.5 10178.5 10175.0 10172.0 10171.5 10168.0 10168.0 10164.0 10163.5 10137.5 10137.5 10121 . 0 10121 . 0 10115.5 10117.0 10107.5 10107.5 10096.5 10093.0 10080.5 10078.0 10070.0 10067.5 10067.5 10064.0 10064.0 10061.5 10061.5 10055.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 10052.5 10054.5 10033.0 10035.0 10028.0 10030.0 10026.0 10028.0 10025.5 10022.5 10023.5 10022.0 100.0 101.0 $ REMARKS: 10030.0 10028.0 10023.5 101.5 CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTD DATA AQUIRED ON BP EXPLORATION'S B-10 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BCS GAF~A RAY, ALSO PASS #1 NPHI AND THE BCS GAM~A RAY, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ $ PA GE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMFIARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10370.5 9995.0 CNTD 10384.5 9995.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD .............. REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #1. THERE ARE LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-L 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1092623 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: DEPT. 10384.500 NPHI. CNTD 34.100 NRAT. CNTD NCNT. CNTD 2205.810 FCNT. CNTD 384.577 CFTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1445.000 CCL.CNTD DEPT. 9995.000 NPHI. CNTD -999.250 NRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD GRCH. CNTD 611.243 TENS. CNTD -999.250 CCL.CNTD 5. 736 CRAT. CNTD 374. 512 CNTC. CNTD 0.000 -999.250 CRAT. CNTD -999.250 CNTC. CNTD -999.250 5.946 2444.333 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUF~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 10371.0 9993.5 CNTD 10381.5 9994.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: BASELINE DEPTH .............. 88888.0 10381.0 10378.5 10375.5 10369.0 10363.5 10363.0 10355.0 10344.5 10343.0 10341.5 10339.0 10338.0 10334.0 10331.5 10329.0 10325.0 10324.0 10319.0 10315.5 10314.5 10313.5 10309.5 10309.0 10307.0 10305.5 10304.5 10303.0 10301.5 10294.0 10293.0 10289 0 10287 0 10286 5 10286 0 10285 0 10279 5 10277 5 10274 5 10271 0 10270 5 10264 0 10263 5 10261 0 10260 0 10256 5 10253 5 10251 5 10249 5 10248 5 10247 5 10243 5 10238 5 GRCH CNTD 88891.0 88887.5 10366.5 10357.5 10346.5 10344.5 10342.0 10337.5 10330.5 10327.5 10325.0 10320.5 10318.0 10315.5 10311.5 10309.0 10306.0 10304.5 10303.0 10294.5 10288.0 10286.5 10285.5 10280.0 10275.0 10270.5 10265.0 10265.0 10262.0 10255.5 10250.0 10380.5 10377.5 10373.0 10368.0 10363.5 10346.5 10343.5 10335.5 10326.0 10316.0 10311.0 10307.0 10304.0 10297.5 10290.5 10288.0 10282.0 10278.5 10275.0 10271.5 10263.0 10256.5 10252.5 10251.5 10249.5 10243.5 10241.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 10231.0 10230.0 10228.5 10224.0 10222.0 10219 5 10217 5 10210 0 10207 5 10206 5 10202 5 10200 5 10196.5 10195 5 10192 0 10188 5 10188 0 10187 5 10185 0 10182 0 10180.5 10178.0 10174.5 10172.5 10171.0 10169.5 10168.0 10164.5 10163.5 10154.0 10151.0 10146.0 10142.5 10139.0 10130.0 10126.5 10118.5 10118.0 10114.5 10113.5 10110.0 10105.0 10102.5 10099.5 10095.5 1O093.0 10087.5 10086.5 10082.5 10077.0 10075.5 10072.0 10069.5 10068.5 10066.5 10231.0 10222.0 10219.0 10207.5 10196.5 10192.0 10190.0 10187.5 10185.0 10181.0 10178.5 10172.0 10168.0 10164.0 10150.0 10145.5 10143.0 10129.0 10125.0 10116.5 10112.0 10108.0 10102.0 10099.0 10094.5 10088.0 10083.5 10078.0 10069.0 10067.0 10232.5 10229.5 10224.5 10217.0 10212.0 10206.5 10202.0 10198.0 10195.0 10190.0 10182.0 10175.0 10171.5 10168.0 10163.5 10153.5 10139.0 10129.0 10114.5 10110.0 10107.5 10104.0 10096.5 10087.5 10079.0 10072.5 10070.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 10064.0 10064.5 10064.0 10060.5 10061.5 10059.0 10061.0 10051.5 10050.5 10050.0 10051.0 10047.0 10046.5 10042.0 10041.5 10037.0 10039.0 10034.5 10037.0 10033.0 10033.0 10026.0 10028.0 10028.0 10021.5 10023.5 10018.5 10018.5 10017.5 10018.0 10014.5 10014.0 10012.5 10012.0 10005.5 10006.5 10005.0 10002.0 10001.5 9998.0 10000.0 9997.0 9998.5 9996.0 9998.0 100.0 101.5 102.0 $ REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NPHI PASS #2 AND NPHI PASS #1, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: TYPE REPR CODE VALUE 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-L 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTD CPS 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 1092623 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10381.500 NPHI. CNTD 31.814 NRAT. CNTD 5.572 CRAT. CNTD NCNT. CNTD 2142.787 FCNT. CNTD 384.577 CFTC. CNTD 374.512 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1453.000 CCL.CNTD 0.000 DEPT. 9993.500 NPHI. CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 605.816 TENS. CNTD -999.250 CCL.CNTD -999.250 5.696 2480.497 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 10 **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: O. 5000 FILE SUFk4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10368.0 9986.0 CNTD 10384.0 9984.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 10379.5 10378.0 10371.5 10366.5 10362.5 10360.5 10359.0 10354.5 10353.0 10345.0 10343.5 10337.5 10335.5 10331 0 10328 5 10324 0 10323 0 103185 103155 10313.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CH CNTD 88888.0 88890.0 10366.5 10363.5 10357.5 10346.5 10338.0 10330.5 10329.0 10324.5 10321.0 10318.0 10316.0 10381.5 10377.0 10373.5 10364.0 10361.5 10354.5 10346.5 10337.5 10326.0 10320.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 11 10311.0 10314.5 10309.5 10312.0 10302.5 10304.5 10301.0 10303.0 10305.5 10298.0 10303.0 10292.5 10294.0 10285.5 10287.0 10287.5 10279.0 10280.0 10274.5 10275.0 10274.0 10274.5 10272.0 10271.5 10270.0 10270.5 10269.5 10269.0 10266.0 10267.5 10264.0 10263.5 10263.5 10265.0 10261.0 10261.5 10260.0 10255.5 10257.0 10253.5 10254.5 10248.0 10250.0 10244.5 10245.0 10241 . 5 10245.0 10240.5 10242.0 10239.5 10241.5 10233.0 10234.5 10230.0 10230.5 10229.5 10231.0 10224.0 10225.0 10222.0 10222.5 10221.0 10222.5 10218.5 10219.0 10216.0 10217.5 10206.5 10207.0 10206.0 10206.0 10202.5 10203.0 10199.0 10201.0 10198.5 10197.0 10196.0 10196.0 10191.5 10192.0 10187.0 10188.0 10185.0 10184.5 10182.0 10182.5 10181 . 5 10182 . 5 10179.5 10179.5 10176.5 10177.5 10172.0 10172.0 10170.5 10171.5 10169.0 10168.0 10167.5 10167.5 10164.0 10164.0 10163.5 10163.5 10156.0 10155.5 10150.0 10150.5 10147.0 10148.5 10145.5 10145.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 12 10141.5 10143.0 10139.5 10139.0 10136.5 10137.5 10134.5 10134.0 10133.0 10132.0 10130.0 10130.0 10129.5 10129.0 10126.0 10124.5 10124.5 10122.5 10119.0 10115.0 10116.5 10116.0 10113.0 10110.5 10108.0 10109.0 10108.0 10108.0 10104.0 10102.0 10102.0 10098.5 10099.0 10092.0 10092.0 10090.0 10087.0 10088.5 10090.0 10086.5 10087.5 10082.5 10083.5 10080.0 10081.0 10077.5 10079.0 10075.0 10078.0 10072.0 10074.5 10070.0 10070.0 10069.5 10069.5 10066.5 10067.5 10063.5 10064.0 10060.5 10061.5 10059.5 10061.0 10052.0 10055.0 10048.5 10050.5 10047.0 10049.5 10042.0 10041.5 10040.5 10043.5 10037.5 10038.5 10037.0 10039.0 10032.5 10035.0 10031.5 10033.5 10026.0 10028.0 10025.0 10028.0 10022.0 10022.5 10017.5 10018.5 10017.0 10018.5 10013.0 10014.0 10009.0 10011.5 10004.5 10006.5 10002.5 10005.0 9999.0 9999.5 100.0 102.0 100.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 13 PASS #3 AND GRCH PASS #1, ALSO NPHI PASS #3 AND NPHI PASS #1, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 66 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 44 1 0.5 FT 23 0 FT 68 1 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 3 1 1 4 68 0000000000 DEPT FT 1092623 NPHI CNTD PU-L 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 FCNTCNTD CPS 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1092623 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 14 DEPT. 10384.000 NPHI. CNTD 29.288 NRAT. CNTD NCNT. CNTD 2301.478 FCNT. CNTD 456.918 CFTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1488.000 CCL. CNTD DEPT. 9984.500 NPHI.CNTD 53.773 NRAT. CNTD NCNT. CNTD 1629.328 FCNT. CNTD 227.990 CFTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1451.000 CCL. CNTD 5.037 CRA T. CNTD 444. 960 CNTC. CNTD 0.000 7.146 CRAT. CNTD 222.023 CNTC. CNTD 0.000 5.415 2503. 840 7.707 1722.049 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTD REIW3~RKS: THIS FILE CONTAINS THE ARITPi~IETIC AVERAGE OF PASSES 1,2, &3. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 15 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-L 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 1092623 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10384.500 NPHI. CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1445.000 DEPT. 9995.000 NPHI. CNAV -999.250 NRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV GRCH. CNTD 611.243 TENS. CNTD -999.250 -999.250 CRAT. CNAV -999.250 CNTC. CNAV -999.250 -999.250 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 16 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE · FLIC VERSION : 001 CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0. 5000 FILE SUM~IARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10411.5 9942.5 CNTD LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 07-NOV-97 8B1-129 1700 07-NOV-97 10395.0 10396.0 9994.0 10382.0 TOOL NUMBER ........... LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 17 GR CNTD $ GAMMA RAY COMPENSATED NEUTRON CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluids/Sea NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 12500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to 10-15-78 Schlumberger Sonic-GR Fluid Packed with 170 BBL Sea Water 20 BBL Methanol Limestone Matrix used PERF INTERVAL 10320-10330 F, 10370-10398 F THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 18 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 CCLD PS1 V 1092623 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10411.500 NPHI.PS1 RCNT. PS1 1939. 394 RCFT. PS1 GR. PS1 271. 212 TENS. PS1 4.387 RTNR.PS1 2.000 TNRA.PS1 969.697 CNTC. PS1 2158.876 CFTC. PSi 887.000 CCLD.PS1 0.000 DEPT. 9942.500 NPHI.PS1 74.501 RTNR.PS1 9.116 TNRA.PS1 RCNT. PS1 1313.971 RCFT. PS1 144.144 CNTC.PS1 1462.672 CFTC. PSI GR.PS1 588.735 TENS.PSi 1404.000 CCLD.PS1 -999.250 2.116 944.318 9. 646 140. 372 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 19 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUF~Lau~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 10409.0 9944.0 CNTD LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 07-NOV-97 8B1-129 1700 07-NOV-97 10395.0 10396.0 9994.0 10382.0 TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 20 GR CNTD $ GAMMA RAY COMPENSATED NEUTRON CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluids/Sea NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 12500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to 10-15-78 Schlumberger Sonic-GR Fluid Packed with 170 BBL Sea Water 20 BBL Methanol Limestone Matrix used PERF INTERVAL 10320-10330 F, 10370-10398 F THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 21 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1092623 O0 000 O0 0 6 I 1 4 68 0000000000 NPHI PS2 PU 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PS2 CPS 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 CCLDPS2 V 1092623 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 10409.000 NPHI.PS2 4.387 RTNR.PS2 2.000 TNRA.PS2 RCNT. PS2 1939.394 RCFT. PS2 969.697 CNTC. PS2 2158.876 CFTC. PS2 GR.PS2 135.606 TENS.PS2 899.000 CCLD.PS2 0.000 DEPT. 9944.000 NPHI.PS2 51.555 RTNR.PS2 7.087 TNRA.PS2 RCNT. PS2 1249.249 RCFT. PS2 176.176 CNTC. PS2 1390.628 CFTC.PS2 GR.PS2 558.629 TENS. PS2 1400.000 CCLD.PS2 -999.250 2.116 944.318 7.500 171.565 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 22 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUF~r~RY VENDOR TOOL CODE START DEPTH STOP DEPTH 10414.5 9936.5 CNTD LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 07-NOV-97 8B1-129 1700 07-NOV-97 10395.0 10396.0 9994.0 10382.0 TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 23 GR CNTD $ GAMMA RAY COMPENSATED NEUTRON CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluids/Sea NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 2500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 12500 TOOL STANDOFF (IN): REMARKS: Depth Correlated to 10-15-78 Schlumberger Sonic-GR Fluid Packed with 170 BBL Sea Water 20 BBL Methanol Limestone Matrix used PERF INTERVAL 10320-10330 F, 10370-10398 F THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 24 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 CCLDPS3 V 1092623 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 10414.500 NPHI.PS3 727577.625 RTNR.PS3 -999.250 TNRA.PS3 RCNT. PS3 0.000 RCFT. PS3 0.000 CNTC. PS3 0.000 CFTC. PS3 GR.PS3 236.912 TENS. PS3 909.000 CCLD.PS3 -0.010 DEPT. 9936.500 NPHI.PS3 76.910 RTNR.PS3 9.329 TNRA.PS3 RCNT. PS3 1367.939 RCFT. PS3 195.420 CNTC.PS3 1522.746 CFTC. PS3 GR.PS3 578.369 TENS.PS3 1451.000 CCLD.PS3 -999.250 -1057.435 0.000 9. 872 190. 305 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JUN-1998 10:55 PAGE: 25 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/06/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/06/ 2 ORIGIN : FLIC TAPE NAME : 98263 CONTINUATION # : 1 PREVIOUS TAPE : COF~IENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20231-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/06/ 2 ORIGIN : FLIC REEL NAME : 98263 CONTINUATION # : PREVIOUS REEL : COM~IENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20231-00 .............................. . . ~¢orage * ~S~ COMPUTING C~TER * . ****************************** . ............................ ....... SCHL~BERGER ....... . . ............................ COMPANY NAME : BP EXPLORATION (ALASKA), INC. WELL NAME : B- 10 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292032100 REFERENCE NO : 98255 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/05/28 ORIGIN : FLIC REEL NAME : 98255 CONTINUATION # : PREVIOUS REEL : COM~ENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20321-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/05/28 ORIGIN : FLIC TAPE NAME : 98255 CONTINUATION # : 1 PREVIOUS TAPE : COM~ENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20321-00 TAPE HEADER Prudhoe Bay CASED HOLE WIRELINE LOGS WELL NAME: B- 10 API NUMBER: 500292032100 OPERATOR: BP Exploration (Alaska), Inc. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 28-MAY-98 JOB NUMBER: 98255 LOGGING ENGINEER: C Yon OPERATOR WITNESS: M Martin SURFACE LOCATION SECTION: 31 TOWNSHIP: 1 IN RANGE: 14E FNL : FSL: 1611 FEL : FWL: 2070 ELEVATION (FT FROM MSL O) KELLY BUSHING: 64.29 DERRICK FLOOR: GROUND LEVEL: 37.24 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8. 500 7. 000 11100.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 10346.0 10345.5 10336.0 10332.0 10331.5 10322.5 10322.0 10319.5 10319.0 10316.0 10289.0 102 75.0 10274.5 10264.0 10252.5 10229.5 10227.5 102 O1.5 10199.0 10191.5 10185.0 10184.5 10182 5 10182 0 10177 0 10174 0 10172 0 10171 5 10169.0 10168.0 10166.5 10166.0 10164.5 10163.5 10156.0 10154.5 10152.5 10150.0 10142.5 10137.5 10124.5 10123.0 10120.0 10119.0 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNL .............. 88889.0 88888.5 10346.5 10338.0 10333.0 10323.0 10318.5 10316.0 10274.5 10265.0 10254.5 10229.5 10203.5 10190.5 10185.5 10183.0 10178.5 10172.0 10168.0 10165.5 10163.5 10152.0 10147.0 10141.0 10121.0 10116.0 10346.5 10338.0 10333.0 10323.0 10318.5 10288.5 10275.0 10265.0 10254.5 10229.5 10203.5 10201.5 10190.5 10185.5 10183.0 10178.5 10174.5 10172.0 10168.0 10165.5 10163.5 1 O152.0 10149.5 10137.0 10121.5 10116.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 10109.0 10107.5 10107.5 10107.5 10103.5 10103.5 10102.0 10103.5 10099.0 10097.0 10098.0 10097.0 10093.0 10091.5 10092.5 10091.0 10087.0 10085.0 10085.0 10082.5 10081.0 10072.5 10072.5 10070.0 10070.0 10067.0 10067.5 10065.0 10065.0 10064.0 10064.0 10060.5 10061.5 10061.5 10054.5 10055.0 10055.0 10033.0 10034.5 10032.5 10034.5 10029.0 10030.0 10028.0 10030.0 10026.5 10028.0 10026.0 10028.0 10018.5 10020.0 10020.0 100.0 101.5 101.5 $ REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNL DATA AQUIRED ON BP EXPLORATION'S B-10 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BCS GAI~r~ARAY, ALSO PASS #1 NPHIAND THE BCS GAMMA RAY, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~m~ARY LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10369.0 9991.5 CNL 10383.5 9991.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNL .............. REMARKS: THIS FILE CONTAINS CASED HOLE CNL PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-L 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1022544 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10383.500 NPHI.CNTD 30.560 NRAT. CNTD 5.421 CRAT. CNTD NCNT. CNTD 3075.075 FCNT. CNTD 567.208 CFTC. CNTD 520.220 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1638.000 CCL.CNTD 0.000 DEPT. 9991 . 500 NPHI. CNTD 41. 383 NRAT. CNTD 8.316 CRAT. CNTD NCNT. CNTD 2574. 338 FCNT. CNTD 309. 572 CFTC. CNTD 283. 927 CNTC. CNTD GRCH. CNTD 410.534 TENS. CNTD 1626.000 CCL. CNTD 0.000 5.560 3193. 980 6.579 2358.217 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: FILE HEADER FILE 1FUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUF~La~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10369.0 9994.5 CArL 10384.0 9993.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. 88888.0 10381.5 10377.5 10368.5 10364.5 10362.5 10359.5 10357.0 10355.5 10352.5 10344.5 10344.0 10342.0 10338.5 10336.0 10335.5 10332.5 10331.5 10331.0 10330.0 10328.5 10323.5 10319.0 10315.5 10314.5 10313.0 10309.5 10307.0 10302.5 10298.5 10295.5 10293.0 10292.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNL .............. 88889.0 88889.0 10365.5 10361.5 10358.5 10354.0 10346.0 10338.5 10338.0 10334.0 10333.0 10330.5 10323.5 10318.5 10316.0 10313.5 10309.5 10307.0 10303.0 10298.0 10292.5 10382.5 10378.0 10373.0 10364.5 10356.0 10345.5 10343.0 10336.5 10333.0 10331.0 10314.0 10308.0 10299.5 10293.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 10289 . 5 10288.5 10286.0 10286.0 10286.0 10281 . 0 10281 . 5 10279.0 10279.0 10274.0 10274.5 10273.0 10275.0 10269.5 10270.5 10266.0 10266.5 10265.0 10266.5 10263.5 10265.0 10261.5 10263.5 10261 . 0 10262.0 10256.5 10258.0 10253.0 10254.5 10248.5 10249.5 10247.5 10250.5 10241.5 10242.0 10238.0 10239.5 10229.0 10229.0 10228.5 10231.0 10224.0 10224.0 10221.0 10223.5 10216.0 10217.5 10208.0 10210.0 10203.0 10201.5 1 O195.5 1 O196.5 10192.5 10195.5 1 O191.5 1 O190.5 10191.0 10193.0 10187.0 10187.5 10184.0 10185.5 10185.5 10182.0 10183.0 10178.0 10180.0 10177.0 10178.5 10173.5 10174.5 10172.0 10172.0 10171.0 10172.0 10169.0 10168.0 10166.0 10165.5 10163.5 10163.5 10161.5 10161.0 10160.5 10160.0 10159.0 10157.5 10157.5 10154.5 10152.5 10154.0 10152.0 10146.0 10144.0 10142.5 10140.5 10138.5 10137.0 10138.0 10137.0 10133.5 10131.0 10129.5 10126.5 10128.5 10129.0 10125.5 10122.5 10124.5 10123 . 0 10120.0 10116.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 10117.5 10114.0 10111.0 10110.5 10110.5 10109.5 10109.0 10107.5 10105.0 10103.5 10102.0 10103.5 10100.0 10099.0 10097.5 10097.5 10096.0 10095.0 10095.0 10094.0 10094.5 10091.5 10086.5 10085.0 10080.0 10079.0 10077.5 10077.5 10075.5 10075.0 10069.5 10070.5 10066.0 10067.5 10064.5 10065.0 10063.5 10064.0 10063.0 10063.5 10059.5 10061.0 10052.0 10054.5 10050.5 10052.0 10049.5 10054.0 10046.5 10049.5 10042.0 10043.5 10038.5 10040.0 10037.0 10038.0 10036.5 10038.0 10032.5 10034.5 10027.5 10030.0 10025.0 10027.5 10027.5 10017.0 10020.0 10020.0 10015.5 10018.5 10015.0 10015.5 10012.5 10012.0 10011.5 10011.0 10010.0 10009.5 10007.5 10007.5 10004.5 10007.0 10004.0 10004.5 9998.5 9997.0 9998.0 9998.5 9995.5 9995.0 100.0 100.5 99.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE CNL PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NPHI PASS #2 AND NPHI PASS #1, CARRYING ALL CNL CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CH_AN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-L 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 NCNTCNTD CPS 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 1022544 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10384. 000 NPHI. CNTD 29. 412 NRAT. CNTD 5. 396 CRAT. CNTD NCNT. CNTD 3314. 345 FCNT. CNTD 614.173 CFTC. CNTD 563.295 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD 1655. 000 CCL. CNTD O . 000 DEPT. 9993.500 NPHI.CNTD 43.009 NRAT. CNTD 7.085 CRAT. CNTD NCNT. CNTD 2267.311 FCNT. CNTD 320.000 CFTC. CNTD 293.491 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1604.000 CCL.CNTD 0.000 5.429 3229.730 6. 701 2270. 627 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28~MAY-1998 14:46 PAGE: 10 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: O . 5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10369.0 9996.0 CNL 10383 . 5 9994.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNL 88888.0 88889.0 88888.5 10377.5 10378.0 10375.5 10376.0 10368.5 10373.0 10364.5 10365.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 11 10363.0 10361.0 10356.5 10349.0 10345.0 10344.5 10336.0 10334.5 10331.0 10330.0 10329 0 10323 5 10322 0 10321 0 10319 5 10317 0 10316 0 10314 0 10309 5 10307 0 10303 0 10300 5 10299 0 10293 5 10292 5 10289 0 10286.0 10282 5 10279 5 10274 5 10270 5 10265 0 10264 0 10261 5 10260 5 10256.0 10255 5 10253 5 10250 0 10248 5 10248 0 10230 5 10219.0 10215.5 10208.0 10202.5 10199.0 10198.5 10195.5 10192.0 10185.0 10182.5 10177.5 10176.5 10174.0 10362.5 10357.0 10351.0 10346.0 10338.0 10333.0 10330.0 10324.5 10321.0 10318.5 10316.0 10315.5 10313.5 10309.5 10307.5 10303.0 10300.5 10293.0 10286.0 10279.5 10274.5 10271.0 10267.0 10265.0 10263.0 10258.0 10254.5 10252.0 10250.5 10221.0 10210.0 10201.0 10196.5 10193.5 10183.0 10179.0 10364.0 10345.5 10336.5 10331.0 10323.5 10314.0 10299.0 10293.0 10288.5 10282.5 10275.0 10264.5 10258.0 10249.5 10230.0 10217.5 10206.0 10201.5 10185.5 10179.5 10174.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 12 10171.5 10172.5 10171.0 10172.0 10169.0 10168.0 10167.5 10168.0 10167.0 10165.0 10163.5 10163.5 10161 . 0 10160.0 10160.5 10159.0 10157.5 10157.0 10153.5 10152.5 10149.5 10149.5 10146.0 10144.0 10145.5 10144.0 10144.0 10143.0 10142.0 10140.5 10137.5 10137.0 10136.5 10134.5 10129.5 10126.5 10129.0 10129.0 10125.5 10122.5 10119.5 10117.0 10118.0 10115.0 10115.5 10112.0 10111 . 0 10110.5 10110.0 10109.5 10106.0 10103.5 10102.5 10103.0 10098.5 10097.5 10095.5 10094.0 10092.5 10091.5 10086.0 10085.0 10080.0 10079.0 10077.0 10077.0 10076.0 10075.0 10070.0 10070.0 10067.0 10067.5 10063.5 10063.5 10064.0 10060.0 10061 . 0 10058.5 10061.0 10054.5 10055.0 10053.0 10055.0 10045.0 10047.0 10038.0 10041.0 10041.5 10036.5 10038.0 10034.5 10036.0 10032.5 10034.5 10031.5 10034.5 10026.0 10027.5 10028.0 10023.0 10024.5 10018.5 10020.0 10017.0 10019.5 10006.5 10009.0 10005.0 10006.5 10001.5 10001.0 9997.0 9999.0 9997.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 13 100.0 $ 102.0 100.0 REMARKS: THIS FILE CONTAINS CASED HOLE CNL PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #3 AND GRCH PASS #1, ALSO NPHI PASS #3 AND NPHI PASS #1, CARRYING ALL CNL CURVES WITH THE NPHI SHIFTS. LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT i1 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-L 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 FCNTCNTD CPS 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1022544 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 14 ** DATA ** DEPT. 10383.500 NPHI.CNTD 30.407 NRAT. CNTD 5.548 CRAT. CNTD NCNT. CNTD 3434.761 FCNT. CNTD 619.145 CFTC. CNTD 567. 854 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1673. 000 CCL. CNTD O. 000 DEPT. 9994. 000 NPHI. CNTD 30. 506 NRAT. CNTD 5. 898 CRAT. CNTD NCNT. CNTD 2882. 883 FCNT. CNTD 488. 798 CFTC. CNTD 448. 306 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD 1598. 000 CCL. CNTD O. 000 5.543 3347.267 5.554 2791. 429 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUF~iARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10369.0 9995.5 CNL 10385.5 9992.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 15 BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 10375.5 10372.5 10364.5 10361.0 10356.5 10356.0 10345.0 10344.5 10336.0 10335.0 10328.5 10326.0 10324.0 10319.0 10309.5 10307.0 10299.5 10293.5 10292.5 10285.0 10280.5 10278.5 10275.0 10270.0 10263.5 10258.5 10256.0 10250.5 10245.0 10241.0 10237 5 10229 5 10222 0 10219 0 10216 5 10215 0 10208 5 10207.5 10202.5 10202.0 10198.5 10192.0 10186.5 10184.5 10184.0 10182.5 10180.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNL 88889.0 88890.5 10378.0 10373.0 10365.5 10362.5 10357.0 10346.0 10338.0 10330.0 10324.0 10318.5 10309.5 10307.0 10293.0 10285.0 10278 5 10275 0 10270 5 10265 0 10261~ 0 10258, 5 10252, 5 10243.0 10240.0 10224.0 10221.0 10216.5 10210.0 10205.5 10190.5 10187.5 10185.5 10183.0 10181.5 10356.5 10345.5 10336.5 10328.0 10299.5 10293.0 10281.0 10275.0 10262.5 10249.0 10238.5 10230.5 10223.5 10217.5 10209.5 10205.0 10201.0 10185.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 16 10178.0 10174.0 10172.0 10171.5 10169.0 10168.0 10167.0 10166.5 10164.0 10162.0 10160.5 10156.0 10154.0 10146.5 10145.0 10144.5 10142.5 10138.0 10137.5 10133.0 10129.5 10126.0 10120.0 10117.5 10115.0 10110.0 10109.5 10106.0 10099.0 10096.5 10094.5 10087.0 10086.5 10079.5 10076.5 10076.0 10070.5 10064 0 10063 5 10060 0 10054 0 10041 0 10039 5 10033.5 10032.0 10026.0 10025.5 10017.5 10015.5 10012.0 10008.5 10005.0 10004.5 10002.0 9998.0 10178.5 10172.0 10168.0 10165.5 10164.0 10160.0 10152.5 10144.0 10140.5 10134.5 10127.0 10122.5 10115.0 10107.5 10097.5 10094.5 10085.0 10079.0 10077.5 10070.0 10063.5 10055.0 10043.5 10040.5 10034.5 10028.0 10019.5 10006.5 10175.0 10172.0 10168.0 10165.5 10163.5 10159.0 10153.0 10144.5 10143.0 10137.0 10132.0 10129.0 10116.5 10112.5 10109.5 10103.5 10094.0 10085.0 10076.5 10070.0 10064.0 10061.0 10055.0 10034.5 10028.0 10016.0 10011.0 10008.0 10003.0 10001.0 9996.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 17 100.0 $ 1 O1.5 98.5 REMARKS: THIS FILE CONTAINS CASED HOLE CNL PASS #4. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #4 AND GRCH PASS #1, ALSO NPHI PASS #4 AND NPHI PASS #1, CARRYING ALL CNL CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNTD PU-L 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNTD 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNTD 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNTD CPS 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNTD CPS 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNTD CPS 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNTD CPS 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH ClFTD GAPI 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 CCL CNTD V 1022544 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 18 ** DATA ** DEPT. 10385.500 NPHI. CNTD 28.703 NRAT. CNTD 5.832 CRAT. CNTD NCNT. CNTD 3323. 829 FCNT. CNTD 569. 975 CFTC. CNTD 522. 757 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1645. 000 CCL. CNTD O. 000 DEPT. 9992. 500 NPHI. CNTD 33. 677 NRAT. CNTD 5. 419 CRAT. CNTD NCNT. CNTD 2737.271 FCNT. CNTD 505. 092 CFTC. CNTD 463. 249 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD 1588. 000 CCL. CNTD O . 000 5.348 3225. 953 5. 903 2731. 890 ** END OF DATA ** * * * * FILE TRAILER * * * * FILE NAME : EDIT .004 SERVICE : FLIC VERSION ' O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS CNL 1, 2, 3, 4, $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1,2, 3 &4. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 19 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI CNAV PU-L 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 NRAT CNAV 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 CRAT CNAV 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 NCNT CNAV CPS 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 FCNTCNAV CPS 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC CNAV CPS 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC CNAV CPS 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 GRCH CNTD GAPI 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 TENS CNTD LB 1022544 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10383.500 NPHI.CNAV 29.652 NRAT. CNAV 5.422 CRAT. CNAV NCNT. CNAV 3176.400 FCNT. CNAV 585.944 CFTC. CNAV 537.404 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1638.000 5.457 3260.147 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 2O DEPT. 9991. 500 NPHI. CNAV -999. 250 NRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999. 250 CFTC. CNAV GRCH. CNTD 410.534 TENS. CNTD 1626.000 -999. 250 CRAT. CNAV -999. 250 CNTC. CNAV -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUmmARY VENDOR TOOL CODE START DEPTH CNL 10411.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9989.0 31-0CT-97 8C0-069 1626 31-0CT-97 10395.0 10396.0 9990.0 10383.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 21 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~fA RAY CNL COMPENSATED NEUTRON $ TOOL NUMBER CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluid NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Thank you for using Schlumberger This log was depth referenced to a SWS BHC log dated, 10-15-78 LIMESTONE Matrix used to match previous CNL logs Ail depth correlations witnessed by co. rep. Pass #1 & #2 are overlayed and all passes are presented individually. WELL TEST SUM~NkRY: (10-03-97) ELAPSED TIME: 4 HRS FORMATION GAS RATE: 6.26 FI~SCFD, MAN TEMP: 128 DEGF, MAN PRESS: 201 PSIG, GFR: 1.48 MBPD, NOR: 0.95 MBOPD, NWR: 0.54 MBWPD, GOR: 6611SCF/STB, LIFT GAS RATE: 0.0 MMSCFD, CASING PRESS: 0 PSIG, TGOR: 6611 SCF/STB, TGLR: 4216 SCF/BBL, CHOKE: 95.8 DEG LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 22 THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS1 PU 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS1 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS1 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS1 CPS 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS1 CPS 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS1 CPS 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS1 CPS 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS1 GAPI 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS1 LB 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 CCLD PS1 V 1022544 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 23 DEPT. 10411.500 NPHI.PS1 665153.375 RTNR.PS1 RCNT. PS1 1882.353 RCFT. PS1 0.000 CNTC. PS1 GR.PS1 26.324 TENS.PSi 961.000 CCLD.PS1 DEPT. 9989.000 NPHI.PS1 RCNT. PS1 2117.048 RCFT. PS1 GR.PS1 405.825 TENS.PSi 42.216 RTNR.PS1 342.159 CNTC. PS1 1588.000 CCLD. PS1 -999.250 1887.109 0.038 6.187 2358.217 -999.250 TNRA.PS1 CFTC.PSI TNRA.PS1 CFTC. PSI -1011.173 0.000 6.641 313.814 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUI~I~ARY VENDOR TOOL CODE START DEPTH CNL 10412.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : STOP DEPTH .......... 9992.5 31-0CT-97 8C0-069 1626 31-0CT-97 10395.0 10396.0 9990.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 24 BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 10383.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMFLA RAY CNL COMPENSATED NEUTRON $ TOOL NUMBER CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluid NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): RE~L~RKS: Thank you for using Schlumberger This log was depth referenced to a SWS BHC log dated, 10-15-78 LIMESTONE Matrix used to match previous CNL logs Ail depth correlations witnessed by co. rep. Pass #1 & #2 are overlayed and all passes are presented individually. WELL TEST SUMFLARY: (10-03-97) ELAPSED TIME: 4 HRS FORMATION GAS RATE: 6.26 M~SCFD, MAN TEMP: 128 DEGF, MAN PRESS: 201 PSIG, GFR: 1.48 MBPD, NOR: 0.95 MBOPD, LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 NWR: 0.54 MBWPD, GOR: 6611 SCF/STB, LIFT GAS RATE: 0.0 FI~ISCFD, CASING PRESS: 0 PSIG, TGOR: 6611 SCF/STB, TGLR: 4216 SCF/BBL, CHOKE: 95.8 DEG THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA PAGE: 25 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS2 PU 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS2 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 TArRA PS2 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS2 CPS 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS2 CPS 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS2 CPS 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS2 CPS 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS2 GAPI 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS2 LB 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 CCLD PS2 V 1022544 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 26 ** DATA ** DEPT. 10412.000 NPHI.PS2 RCNT. PS2 1882.353 RCFT. PS2 GR.PS2 105.294 TENS.PS2 DEPT. 9992.500 NPHI.PS2 RCNT. PS2 2369.099 RCFT. PS2 GR.PS2 393.975 TENS.PS2 3.812 RTNR.PS2 941.177 CNTC. PS2 911.000 CCLD. PS2 41.372 RTNR.PS2 360.322 CNTC. PS2 1599.000 CCLD.PS2 2.000 1887.109 -0.048 6.575 2291. 280 -999.250 TNRA.PS2 CFTC.PS2 TNRA.PS2 CFTC. PS2 2. 024 863.209 6.578 330. 472 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE · 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~BER' 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUFkr~a_RY VENDOR TOOL CODE START DEPTH CNL 10411.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): STOP DEPTH .......... 9992.5 31-0CT-97 8C0-069 1626 31-0CT-97 10395.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28~MAY-1998 14:46 PAGE: 27 TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 10396.0 9990.0 10383.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNL COMPENSATED NEUTRON $ TOOL NUMBER CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluid NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Thank you for using Schlumberger This log was depth referenced to a SWS BHC log dated, 10-15-78 LIMESTONE Matrix used to match previous CNL logs Ail depth correlations witnessed by co. rep. Pass #1 & #2 are overlayed and all passes are presented individually. WELL TEST SUF~ARY: (10-03-97) ELAPSED TIME: 4 HRS LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 28 FORMATION GAS RATE: 6.26FI~SCFD, MAN TE~IP: 128 DEGF, MAN PRESS: 201 PSIG, GFR: 1.48 MBPD, NOR: 0.95 MBOPD, NWR: 0.54 MBWPD, GOR: 6611 SCF/STB, LIFT GAS RATE: 0.0 ~SCFD, CASING PRESS: 0 PSIG, TGOR: 6611 SCF/STB, TGLR: 4216 SCF/BBL, CHOKE: 95.8 DEG THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELI~4 CODE (HEX) DEPT FT 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 NPHI PS3 PU 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 RTNR PS3 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 TNRA PS3 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 RCNTPS3 CPS 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 RCFT PS3 CPS 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 CNTC PS3 CPS 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 CFTC PS3 CPS 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 GR PS3 GAPI 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 TENS PS3 LB 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 CCLD PS3 V 1022544 O0 000 O0 0 8 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 29 ** DATA ** DEPT. 10411 . 500 NPHI. PS3 665153.375 RTNR. PS3 RCNT. PS3 1939 . 394 RCFT. PS3 O. 000 CNTC. PS3 GR.PS3 162.727 TENS.PS3 1047.000 CCLD.PS3 -999.250 TNRA.PS3 1944.294 CFTC. PS3 -0.038 -1011.173 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE · FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 4 DEPTH INCREMENT: O . 5000 FILE SUA~r~ARY VENDOR TOOL CODE START DEPTH ........................... CNL 10413.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 9991.0 31-0CT-97 8C0-069 1626 31-0CT-97 10395.0 10396.0 9990.0 10383.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 3O DEPTH CONTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNL COMPENSATED NEUTRON $ TOOL NUMBER ........... CGRS-A CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 8.500 11100.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : Produced Fluid NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE 2.71 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Thank you for using Schlumberger This log was depth referenced to a SWS BHC log dated, 10-15-78 LIMESTONE Matrix used to match previous CNL logs All depth correlations witnessed by co. rep. Pass #1 & #2 are overlayed and all passes are presented individually. WELL TEST SUMMARY: (10-03-97) ELAPSED TIME: 4 HRS FORMATION GAS RATE: 6.26 ~SCFD, MAN TEMP: 128 DEGF, MAN PRESS: 201 PSIG, GFR: 1.48 MBPD, NOR: 0.95 MBOPD, NWR: 0.54 MBWPD, GOR: 6611 SCF/STB, LIFT GAS RATE: O.O~MSCFD, CASING PRESS: 0 PSIG, TGOR: 6611 SCF/STB, LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE: 31 TGLR: 4216 SCF/BBL, CHOKE: 95.8 DEG THIS FILE CONTAINS THE RAW DATA FOR PASS #4. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 NPHI PS4 PU 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 RTNR PS4 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 TNRA PS4 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 RCNTPS4 CPS 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 RCFT PS4 CPS 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 CNTC PS4 CPS 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 CFTC PS4 CPS 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 GR PS4 GAPI 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 TENS PS4 LB 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 CCLDPS4 V 1022544 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 28-MAY-1998 14:46 PAGE 32 DEPT. 10413.500 NPHI.PS4 665153.375 RTNR.PS4 RCNT. PS4 2000.000 RCFT. PS4 0.000 CNTC. PS4 GR.PS4 195.781 TENS.PS4 933.000 CCLD.PS4 DEPT. 9991.000 NPHI.PS4 RCNT. PS4 2867.617 RCFT. PS4 GR.PS4 405.924 TENS. PS4 32.509 RTNR.PS4 505.092 CNTC. PS4 1615.000 CCLD.PS4 -999.250 TNRA.PS4 2005.053 CFTC. PS4 -0.105 5.677 TNRA.PS4 2830.852 CFTC. PS4 -999.250 -1011.173 0.000 5.776 463.249 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/28 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/05/28 ORIGIN : FLIC TAPE NAME : 98255 CONTINUATION # : 1 PREVIOUS TAPE : COIV~IENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20321-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/05/28 ORIGIN : FLIC REEL NAME : 98255 CONTINUATION # : PREVIOUS REEL : COMMENT : BP EXPLORATION, PRUDHOE BAY, B-10, API #50-029-20321-00