Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout199-122 Ima ect Well History File C( ~e XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. J ~ ~_- .~ ~__ ~' Well History File Identifier Organizing (done) r¢'l RESCAN Color items: [] Grayscale items: [] Poor Quality Ori.q inals: Other: NOTES: BY: BEVERLY~ DIGITAL DATA eVE RSIZED (Scannable) ~ Diskettes, No. ~ [3 Maps: [] Other, No/Type [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other Project Proofing BY: ~BREN VINCENT SHERYL MARIA LOWELL Scanning Preparation ' ~'- x 30 = ~ O BY: Production Scanning Stage I PAGE COUNT FROM SCANNED FILE: COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~_ YES NO PAGE IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO / Stage 2 BY~ (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL A~I-i'ENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR #vlAGES) ReScanned (individual page [special attention] scanning completed) RESCANNEDBY; BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Is~ General Notes or Comments about this file: Quality Checked (done) 10/25/02Rev3NOTScanned.wpd · Legal Well Name: MPH-08 Common Well Name: MPH-08B Spud Date: 9/3/1997 Event Name: REENTER+COMPLETE Start: 3/27/2001 End: 4/20/2001 Contractor Name: NABORS Rig Release: 4/20/2001 Group: COIL Rig Name: NABORS 3S Rig Number: : Description of Operati°ns: 3/30/2001 00:00 - 01:20 1.33 STWHIP PROD1 Continue surface checks with EDC, 01:20 - 03:45 2.42 STWHIP PROD1 RIH. Pump 10 Bbls methanol @ 4000'. Pressures up once to 1600~. Broke free. 8300' tool shorts out. Pump and move pipe. No change. 03:45 - 07:30 3.75 STWHIP BHA PROD1 POH. Change out Pawl on level-wind. 07:30 - 09:30 2.00 STWHIP BHA PROD1 At surface. Break off below EDC. EDC found to be the problem. Change out and surface test. OK. 09:30 - 11:15 1.75 STWHIP BHA PROD1 RIH with BHA #2. Circulate in milling fluid; 1/2ppb Biozan in 9.2 ppg KCL/NaCL, with Klagard and corrosion inhibitor. RIH weight ~ 2-4k#. 11:15 - 11:45 0.50 STWHIP PROD1 Set down on 5" x 7" liner hanger. Complete displacement of 60/40 from coil. close EDC. Pump minimum rate. Make it past liner hanger. Continue RIH pumping minimum rate. Tag cement at 9051' CTM. 11:45 - 12:20 0.58 STWHIP PROD1 Pick up 40k#. Bring pump rate up to 2,8 bpm. 3200 free spin. Wash through soft cement to 9088'. Start seeing motor work. Call this notch. 12:20 - 14:30 2.17 STWHIP PROD1 Mill window from 9085'. String weight showing -4k#. Milling rate increases @9097'. (BOW) Make pass up through window. 1 stall in up direction. 14:30 - 17:15 2.75 STWHIP PROD1 I Milling open hole at 6-21 fph from 9097'. Mill OH to 9108°. Circulate 30 Bbls 2 ppb Biozan pill on bottom. Catch samples on bottoms up. Shut I down pump. Drift window. Clean up and down. Above window, open EDC. 2.8 bpm, 2900~ ctp. No fluid losses through milling operation. 17:15 - 18:00 0.75 STWHIP PROD1 Circulate milling fluid at 9070' while wiating on mud truck. Mud arrives. 18:00 - 18:30 0.50 STWHIP PROD1 PJSM with night crew. Mud swap and recovery. 18:30 - 19:30 1.00 STWHIP PROD1 Pump down pit levels. Ship milling fluids to clean tiger tank. Displace well to 9.2ppg FIoPro. 19:30 - 21:30 2.00 STWHIP PROD1 POH circulating. 21:30 - 23:40 2.17 STWHIP PROD1 L/D BHA #2. Window mill guages 3.73" (chromed from formation) string reamer guages 3.8". M/U BI-IA #3, build assembly w/1.7 MMotor. 23:40 - 00:00 0.33 DRILL PROD1 RIH with BHA #3. OAL = 63.1' 3/31/2001 - 00:00 - 01:30 1.50 DRILL PROD1 RIH w/BHA #3. 01:30 - 06:30 5.00 DRILL DATA PROD1 Attempt GR tie-in twice. Computer/Depth problems. 06:30 - 07:30 1.00 DRILL PROD1 Log GR tie-in, -4'. ~ 07:30- 08:10 0.67 DRILL PROD1 P, IH and tag bottom @ 9104'. 08:10 - 09:30 1.33 DRILL PROD1 Drill build f/9104' to 9163°. 1.8 bpm, 2920 psi off bottom, 3200 drilling, BHP=2500. Up wt 35k#, slack off to 2k#, DH WeB ~ 2k#. TF 33L. (oriented from 111 L, slow due to temp. 65 F.) Begin heating recovered milling fluid w! HB&R. Fluid temp. starting @ 30 F. 09:30 - 11:15 1.75 DRILL POWR PROD1 Repair Dowell and BHI computer problems along with rig fuel line freezing. 5 sec. sample rate on Dowell computer appears to be locking it up. Second time in two days. Adjust rate to 30 sec. rate. Wind picking up to 30 mph. Phase one conditions called. 11:15 - 12:25 1.17 DRILL PROD1 Drill to 9200' with 3k# WeB. Losses at 1 bph. 12:25 - 15:00 2.58 DRILL PROD1 POH. Open circ. valve above window. 15:00 - 16:30 1.50 DRILL PROD1 Change bit, adjust AKO, add resistivity. 16:30 - 21:00 4.50 DRILL OTHR PROD1 USMPR resistivity tool not responding in string. Trouble shoot. Break out tool. Retest. Working. M/U BHA #4. 21:00 - 00:00 3.00 DRILL OTHR PROD1 RIH w/BHA #4. OAL = 74.86'. Continue to trouble shoot USMPR 3roblem. 4/1/2001 00:00 - 00:30 0.50 DRILL OTHR PROD1 Trouble shoot USMPR. May be mud-temperature induced. .00:30-03:00 2.50 DRILL PROD1 RIH. 03:00 - 04:30 1.50 DRILL OTHR PROD1 Configure Resistivity display out-put. Printed: 5/1/2001 10:29:37 AM Legal Well Name: MPH-08 Common Well Name: MPH-08B Spud Date: 9/3/1997 Event Name: RECOMPLETION Start: 2/8/2001 End: Contractor Name: Rig Release: Group: RIG Rig Name: Rig Number: 'iiiiii!~i"ii!iiii:ii'"' i! ...... ~:~ ~~iil :,iiiii~ii"~}~:~i!i~:~}i~i!" '! ii:ii'i!iii':'::} !'"i'" ? :::i~i :: ;ii :i' i:'~$sfi?iiPti°n 0foperationS:~ :; i~ii 2/11/2001 18:00 - 19:00 1.00 MOB PRE Scope and lower derrick on MPU C-01 19:00 - 20:00 1.00 MOB PRE Prepare rig for move from C-01 to H-08A 20:00 - 23:00 3.00 MOB PRE Move Rig From MPC-01 to MPH-08A 23:00 - 00:00 1.00 MOB PRE Spot and Berm Sub, Pits and Pipe Shed 2/12/2001 00:00 - 02:00 2.00 MOB PRE Spot and Berm Sub, Pits and Pipe Shed 02:00 - 04:00 2.00 RIGU PRE Raise and scope derrick 04:00 - 07:00 3.00 RIGU PRE RU Lines to Tree and Pull BPV and Fill Pits w 8.5 PPG fluid. Rig up tiger tank for diesel returns 07:00 - 10:00 3.00 CLEAN INTERV Monitor pressure. 250 psi annulus & 200 psi tubing pressure. Bleed tubing down to 0 psi. Bullheaded well with 135 bbls of 9.0 ppg brine at 5 bbl/min at 1050 psi. Well on vacuum. Annulus 250 psi. 10:00 - 11:00 1.00 CLEAN INTERV Monitor well. Install TWC Valve. Test to 3,500 psi 11:00 - 13:00 2.00 CLEAN INTERV Nipple down Tree 13:00 - 16:00 3.00 CLEAN INTERV Nipple up 13 5/8" BOPE 16:00 - 22:00 6.00 CLEAN INTERV Replace packing unit and seals in Annular Preventer 22:00 - 00:00 2.00 CLEAN INTERV Install Bell nipple -Choke line, Open pipeand blind ram doors and clean inside of BOP 2/13/2001 00:00 - 03:00 3.00 CLEAN INTERV Test BOPE to 250 psi/3500 psi. Annular to 2500 psi Test Witness Waived BY Leu Grimaldi of AOGCC 03:00 - 04:00 1.00 CLEAN INTERV Pu Lubricator and Pull TWC valve/Install BPV thread protector 04:00 - 04:30 0.50 CLEAN INTERV Pick up 2 3/8" Nozzle and 2 3/8" x 2 7/8" XO. Make up same. 04:30 - 17:30 13.00 CLEAN INTERV picked up 2 7/8" pac drill pipe in singles. RIH to 9,120'. Broke circulation every 1,000' while going in the hole. 17:30 - 19:00 1.50 CLEAN INTERV displaced well with 58 vis 8.5 ppg brine fluid. Displaced at 3 bbl./rain at 1900 psi with final 2150 psi at 3 bbl./min. 19:00 - 22:30 3.50 CLEAN INTERV Monitor well, work pipe and continue to circulate and condition. Pump at 1.5 bbl/min at 1000 psi. Loss rate of .5 bbl/min. 22:30 - 00:00 1.50 CLEAN INTERV Circulate and condition mud. Pumping at 3 bbl./min rate with 60 vis 8.5 wt and 30 yield point. Lost fluid at rate of 120 bbls/hr. Decreased rate to 2 bbl/min with losses at 60 bbl/hr. 2/14/2001 00:00 - 04:00 4.00 CLEAN INTERV Continue to circulate and condition. Reduced Viscosity from 60 vis at 8.5 ppg to 33 vis at 8.5 ppg. loss rate went from 60 bbls/hr to 5 bbls. hr. Increased rate 2.5 bbl/min at 1250 ps 04:00 - 06:30 2.50 CLEAN INTERV Raised mud weight from 8.5 ppg to 8.6+ ppg circulating and conditioning mud. 06:30 - 07:00 0.50 CLEAN INTERV Wash down from 9,120' to 9,125'. Hit obstruction unable to wash down. 07:00 - 08:00 1.00 CLEAN INTERV Monitor well 08:00 - 17:00 9.00 CLEAN INTERV Pull out of the hole in stands 17:00 - 19:30 2.50 CLEAN INTERV Lay down nozzle and xo. Pick up mill out assembly with Baker Navidrill motor and Hughes 3.80" mill 19:30 - 00:00 4.50 CLEAN INTERV RIH wit BHA and 2 7/8 PAC drill pipe to 4,700' 2/15/2001 00:00 - 04:00 4.00 CLEAN INTERV TIH with BHA and 2 7/8" PAC DP to top of XN Nipple at 8,421'. Tag Top of XN Nipple 8,423' 04:00 - 05:00 1.00 CLEAN INTERV Mill XN Nipple at 2 bpm at 1200 psi. Final 2.8 bpm at 2,800 PSI. Lost 3 bbl/5min 05:00 - 06:30 1.50 CLEAN INTERV TIH with BHA & 2 7/8" PAC DP to 9,105' 06:30 - 09:00 2.50 CLEAN INTERV Wash and ream from 9,105' to 9,125'. Mill from 9,125' to 9,126' 09:00 - 09:30 0.50 CLEAN INTERV Circulate 09:30 - 10:30 1.00 CLEAN INTERV Rig up floor to POH- Pump dry job and monitor well 10:30 - 16:30 6.00 CLEAN INTERV Trip out of the hole SLM from 9,126' to 6090'. 16:30 - 00:00 7.50 CLEAN INTERV Shut down operations secure well and maintain due to phase 3 weather conditions 2/16/2001 00:00 - 01:00 1.00 CLEAN INTERV Shut down operations secure well and maintain due to phase 3 weather Printed: 5/1/2001 10:29:17AM Legal Well Name: MPH-08 Common Well Name: MPH-08B Spud Date: 9/3/1997 Event Name: RECOMPLETION Start: 2/8/2001 End: Contractor Name: Rig Release: Group: RIG Rig Name: Rig Number: :!::} ii~i ii! i!i:ilii :iiiii~~i!i iii}i il ~i'~i!il :i ! ~¢iPti~fi :6f 0pe~ati°ns ' 2/16/2001 00:00 - 01:00 1.00 CLEAN INTERV conditions 01:00 - 10:00 9.00 CLEAN INTERV Trip out of the hole SLM from 6,090' to 3030'. Drop ball and pressure up to 2,500 psi. shear and continue to POH to BHA 10:00 - 11:30 1.50 CLEAN INTERV Laydown 3.80 Mill and 2 7/8" Navidril Motor pick up 3.5" taper mill and 2 7~8" Intec HP Motor !11:30 - 16:30 5.00 CLEAN INTERV Trip in the hole with 3.5" mill and 2 7/8" Intec HP Motor to 9103' 16:30 - 00:00 7.50 CLEAN 'INTERV make up head pin and wash to 9117'. Began milling operations. Milled down to 9,120'. Had tight spot at 9,120' corrected depth and milled 9,126'. Worked out tight spot and picked up to 9,118'. Pumped viscous sweep. Kicked pump out and dropped down to 9,126' with no problems. Recovered no shows of sand of shale. Slight show of metal on ditch magnets. Continue to mill down to 9,141'. 2/17/2001 00:00 - 01:00 1.00 CLEAN i INTERV Unable to make any additional hole with mill. Stack out all wieight and motor would not stall/No differential. PU wt.75 K SO WT. 22K. Worked pipe up to 9,130 and back down to 9,141'. 01:00 - 02:00 1.00 CLEAN INTERV Pull Up to 9,000' monitor well. Pump dry job, 02:00 - 09:30 7.50 CLEAN INTERV POH with 2 7/8" DP and 3.5" Mill and SLM 09:30 - 10:30 1.00 CLEAN INTERV Lay down 3.50" Mill and clean rig floor 10:30 - 11:00 0.50 CLEAN INTERV service rig and clean rig floor. 11:00 - 12:30 1.50 CLEAN INTERV Pick up 3.25" tapered mill and make up same. Test Motor 12:30 - 18:30 6.00 CLEAN INTERV TIH with 3.25" tapered mill and BHA, Fill pipe at 2,000' intervals. TIH and tag at 9,141'. Make up Circulating Head Pin. 18:30 - 00:00 5.50 CLEAN INTERV Wash and mill from 9,141' to 9,144'. Unable to get down any deeper. No progress for 30 minutes. 2/18/2001 00:00 - 01:00 1.00 CLEAN INTERV Continue to atttempt to mill with no progress for 1 1/2 Hrs. 01:00 - 02:00 1.00 CLEAN INTERV Monitor well 30 min. no flow-Pump dry job 02:00 - 08:30 6.50 CLEAN INTERV POH with 2 7/8" DP and BHA 08:30 - 09:30 1.00 CLEAN INTERV Clear rig floor and Lay down BHA 09:30 - 11:30 2.00 CLEAN INTERV Pick up 2 3/8" motor w/2.80" mill. , Ran Motor on 2 joints(62') of 1 1/4" Hydril Tubing followed by 644' of 2 3/8" 2 3/8" PH6 tubing followed by 2 7/8" PAC Drill Pipe. 11:30 - 18:30 7.00 CLEAN INTERV TIH with BHA and 2 7/8" PAC drill pipe. Tag at 9,144'. Pick up WT. 75 K and Slack Off Weight 20 K 18:30 - 22:30 4.00 CLEAN INTERV Milled from 9,144' to 9,156' in 1 HR with 1-2 K wob at 1.9 bpm at 1650 i psi. Milled like washing fill. Only very fine metal shavings at the shaker with no show of sand. Pumped viscous sweep. Continued to ;mill and milled from 9,156' to 9,159' in I Hr. with 1-2 K wob at 2200 psi 1.9 bpm. Attempted to mill at 9,159' with 3.8 k WOB no additional progress. Pumped viscious sweep with no change in recovery. 22:30 - 23:30 1.00 CLEAN INTERV Monitor well - well static - pump dry job. 23:30 - 00:00 0.50 CLEAN INTERV Pull Out of the Hole with 2 7/8" drill pipe and BHA 2/19/2001 00:00 - 04:30 4.50 CLEAN INTERV Pull Out of the Hole with 2 7/8" drill pipe and BHA 04:30 - 06:00 1.50 CLEAN INTERV Check for flow and well static. Lay down 2 3/8" PH-6 Tbg and 1 1/4" Hydril tubing 06:00 - 07:00 1.00 CLEAN INTERV install BP¥ profile protector and clear rig floor. 07:00 - 09:00 2.00 CLEAN INTERV Make up 3.125" mill and TIH to 2,000' 09:00 - 10:00 1.00 CLEAN INTERV POH to jars and lay down same 10:00 - 15:30 5.50 CLEAN INTERV TIH to 9,140' 15:30 - 17:00 1.50 CLEAN INTERV Pick up Kelly and tag 9,144' w/4' down on kelly 17:00 - 00:00 7.00 CLEAN INTERV Make up 2 7/8" PAC pups and began milling at 9,146'. Milled down to 9,166'. Hard milling at 9,155' and 9,160' Hard from 9,160' to 9,166'. 4K WOB 54 rpm at 2 BPM 1200 psi pump pressure. 2/20/2001 00:00 - 03:00 3.00 CLEAN INTERV MILL OUT LINER TO 9168'. COULD NOT MAKE ANY MORE HOLE. Printed: 511/2001 10:29:17 AM Legal Well Name: MPH-08 Common Well Name: MPH-08B 8pud Date: 9131'1997 Event Name: RECOMPLETION Start: 2/8/200'1 End: Contractor Name: Rio Release: Group: RIG Rio Name: Rio Number: 2/20/2001 03:00 - 04:00 1.00 CLEAN INTERV MONITOR WELL, WELL DEAD. 04:00 - 11:30 7.50 CLEAN INTERV POOH W/3 1/8" MILL. 11:30 - 12:00 0.50 CLEAN INTERV L/D BHA & CLEAR FLOOR. 12:00 - 13:30 1.50 CLEAN INTERV SERVICE RIG & CLEAN FLOOR. 13:30 - 14:30 1.00 CLEAN INTERV CUT & SLIP DRILLING LINE. ADJUST BRAKES. 14:30 - 15:30 1.00 CLEAN INTERV M/U 3.625" X 18' WHIPSTOCK DRIFT. & PULL BPV PROFILE PROTECTOR. 15:30 - 21:30 6.00 CLEAN INTERV TRIP IN HOLE & RECORD S/O & P/U WTS. 21:30 - 23:00 1.50 CLEAN INTERV CLEAN PITS & TAKE ON CLEAN 8.6 PPG BRINE. 23:00 - 00:00 1.00 CLEAN INTERV PUMP SWEEP & DISPLACE HOLE TO CLEAN 8.6 PPG BRINE. 2/21/2001 00:00 - 01:00 1.00 CLEAN INTERV DISPLACE HOLE TO 8.6 PPG BRINE. 01:00 - 01:30 0.50 CLEAN INTERV OBSERVE WELL, WELL DEAD. 01:30 - 09:30 8.00 CLEAN INTERV POOH & I_/D DRILL STRING. 09:30 - 10:30 1.00 CLEAN INTERV L/D BHA. R/D HANDLING TOOLS. 10:30 - 11:30 1.00 CLEAN INTERV INSTALL TWC VALVE. TEST TO 3500 PSI. 11:30 - 14:30 3.00 BOPSUF INTERV N/D BOPE. 14:30 - 17:00 2.50 WHSUR INTERV N/U X-MAS TREE. 17:00 - 17:30 0.50 WHSUR INTERV PRESSURE TEST HANGER VOID & X-MAS TREE TO 5000 PSI, OK. 17:30 - 18:30 1.00 WHSUR INTERV PULL TWC VALVE & INSTALL BPV. 18:30 - 19:30 1.00 WHSUR INTERV FREEZE PROECT TBG. PUMPED 35 BBLS DIESEL @ 1.4 BPM, 1200 PSI. 19:30 - 20:00 0.50 RIGD INTERV CLEAN CELLAR & SECURE WELL. RELEASE RIG @ 2000 HRS, 2-21-01. Printed: 5/1/2001 10:29:17 AM Permit to Drill No. 1991220 DATA SUBMITTAL COMPLIANCE REPORT 2/5/2002 Well Name/No. MILNE PT UNIT SB H-08A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22808-01-00 MD 12164 TVD 4235 Completion Date 1/8/2000 Completion Status 1-OIL Current Status P&A UIC N REQUIRED INFORMATION Mud Log No Samples No -- Directional Survey ~ \/ ~ t DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Format D ~1~ SRVY RPT CalR/EWR4-'i'VD iper R SRVY RPT ~ DGR/EWR-MD f_..b,/ DGR/EWR-TVD ~/ DGR/EWR4-MD (data taken from Logs Portion of Master Well Data Maint) Log Log Run Interval OH / Scale Media No Start Stop CH Received Dataset Number Comments 56 25 FINAL 3899 5 FINAL 8300 70 25 FINAL 8588 25 FINAL 3899 25 FINAL 8588 12164 OH O 4235 OH 9115 ch 11090 OH 10442 OH 4190 OH 12164 OH O 2/23/2000 2/22/2000 ~390~8 2/29/2000 3/16/2001 2/23/2OOO 3/2/2000 3/2/2000 2/29/2000 2/22/20OO SPERRY 9019.. 8566-12111 BL, Sepia SPERRY 8571.. PB1 PB1 PB1 8566-11039 Well Cores/Samples Information: Name Start Interval Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Well Cored? Y/(~ Chips Received? ~ Analysis Received? ~ Daily History Received? ~ / N Formation Tops Receuived? (~ N Comments: DATA SUBMITTAL COMPLIANCE REPORT 2/5/2002 Permit to Drill No. 1991220 Well Name/No. MILNE PT UNIT SB H-08A Operator BP EXPLORATION (ALASKA) [NC APl No. 50-029-22808-01-00 MD 12164 TVD 4235 Completion Date 1/8/2000 Completion Status 1-OIL Current Status P&A UIC N Compliance Reviewed By: Date: Review ~ we~ ~ =-' ~ o a.:,:J.' cc~maexx: oxx plu~j-i:~, well hea~ Well hear c-~r. oZ_~: .. .~3x'ke_-' poar. ¢c' place: STATE OF ALASKA ' ALASK~ OIL AND GAS CONSERVATION COMmv, SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 199-122 301-042 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22808-01 4. Location of well at surface !~ ~. 9. Unit or Lease Name 2767' NSL, 4061' WEL, SEC. 34, T13N, R10E, UMr ,~ Milne Point Unit At top of productive interval ~~~.~ ~: 875' SNL, 1978' NWL, Sec. 01, T12N, R10E, UM At total depth il~' ~ 10. Well Number 3509' SNL, 3577' NWL, Sec. 01, T12N, R10E, UM . MPH-08A 111. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit / Schrader Bluff KBE = 65.68' AMSL ADL 380109 12. Date Spudded1/4/2000 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'l/12/2000 3/15/2001 115' water depth' ', °"sh°reN/A MSL 116' N°' °, C°mpleti°nsZero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 12164 4235 FTI 12164 4235 FTI [] Yes [] NoI N/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, PWD 23. CASING, LINER AND CEMENTING RECORD CASING .... SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.1tf H-40 32' 110' 24" :~50 sx Arctic Set (Approx.) 7" 26# L-80 31' 8588' 8-1/2" 2047 sx PF 'E', 263 sx 'G', 191 sx PF 'C 4-1/2" 12.6if L-80 8436' 9417' 6" 46 sx Class 'G' 24. Perforations open to. ProdUction (MD+.TVD of Top and 25. TUBING RECORD Bottom and imerva~, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 8433' 8398' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL {MD) AMOUNT & KIND OF MATERIAL USED 9085' Set Whipstock 9085' P&A w/29 Bbls Class 'G', Sqzd to' 1000 p,~i 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF :WATER'BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. 4,1aska 011 & Gas Co~s. Con]mlss/or~ , Anchora,q~, , Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered Depth Depth and gravity, GOR, and time of each phase. SBF2- NA 8728' 3997' SBF1 - NB 8761' 4019' SBE4 - NC 8821' 4056' SBE2 - NE 8848' 4071' SBE 1 - NF 8963' 4124' TSBD - OA 9068' 4152' TSBC 9200' 4181' 31. List of Attachments: Summary of Daily Drilling Reports :32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble,~_~ ~ Title TechnicalAssistant Date ~'°~'~)l MPH-08A 199-122 301-042 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No.. / Approval No.. . INSTRUCTIONS GENERAL-' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24.' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 3/5/01 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 1042 Company Field: Alaska Oil & Gas Cons Corem Attn: Lisa Weeple 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Milne Point (Cased Hole) Well Job # Lo~l Description Date BL SePia CD MPE-25 L1 ~O~-/{~'7 WFL/RST-/~ 02/21/01 1 1 MPH-08A~ ~ C]4/./,~ ,~ PSP CALIPER LOG 02/25101 I 1 r , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. PetroteCtnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 RECEIVED Date Delivered: HAR 1 6 2001 Naska Oil & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic BIvd Anchorage, AK 99503 ATTN: Sherrie Received by: ~ ~ bp February 25, 2001 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Ddve Anchorage, Alaska 99501 BP Exploration Alaska Inc. Drilling & Wells Coiled Tubing Drilling Team RECEIVED Attention: Subject: Tom Maunder Petroleum Engineer MPH-08a CTD Sidetrack Prep FEB 2 ? 2001 Alaska Oil & Gas Cons. Commission Anchorage Well MPH-08a is scheduled for a multilateral sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prep MPH-08a for drilling and is submitted as an attachment to Form 10-403. A schematic diagram of this proposed completion is attached, Background Nabors 4ES was unable to regain access to the existing horizontal wellbore (H- 08A) below 9126' DPM due to apparently collapsed 4 %" slotted liner. As such, the plan is to set a cement plug to abandon the MPH-08A and then CTD drill MPH-08B in the OA sand (replace MPH-08^) and MPH-08B L1 in the OB sand. P&A Procedure 1. Set whipstock at 9110' in 4 %" slotted liner. - service coil 2. P&A H-08A by bullheading ~10 Bbls of 15.8 ppg class G cement from just above whipstock. (The cement serves to plug off H-08A in the heel area to reduce mud losses while drilling and to further anchor the whipstock). - service coil CTD Sidetrack Operations 3. MIRU CTD drilling rig. Test BOPs. 4. Mill window off whipstock at 9110'. Drill Schrader OA sand horizontal. Run 2 7/8" pre drilled liner. 5. Set whipstock at 9075' in 4 %" slotted liner. 6. Mill window off whipstock at 9075'. Drill Schrader OB sand horizontal. Run 2 7/8" pre drilled liner. The P&A portion of this work is expected to begin 3/5/01. CTD sidetrack is scheduled for mid March. Mark O. Johnson CT Drilling Engineer 564-5666 office 240-8034 cell johnsomo@BP.com STATE OF ALASKA --"",, ALASKi iL AND GAS CONSERVATION COMi, ,SION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Alter Casing [] Change Approved Program 2'. Nam'e of Operator ...... BP Exploration (Alaska) Inc. 99519-6612 3. Address P.O. Box 196612, Anchorage, Alaska Location of well at surface 2767' NSL, 4061' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 875' SNL, 1978' EWL, Sec. 01, T12N, R10E, UM At effective depth 3509' SNL, 3577' EWL, Sec. 01, T12N, R10E, UM At total depth 3509' SNL, 3577' EWL, Sec. 01, T12N, R10E, UM [] Suspend [] Repair Well [] Operation Shutdown 5. RECEIVED [] Plugging [] Time Extension [] Perforate [] Pull Tubing [] Variance [] Other [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack Type of Well: '" 6. Datum Elevation (DF or KB) [] Development KBE = 65.68' AMSL [] Exploratory 7. Unit or Property Name [] Stratigraphic Milne Point Unit [] Service 8. Well Number MPH-08A 9.Permit Number 199-122 10. APl Number FEB 2 7 ZO01 50-029-22808-01 11. Field and Pool Milne Point Unit / Schrader Bluff Alaska 0il & Gas Cons. Commission Anchorage 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 12164 feet Plugs (measured) 4235 feet 12164 feet Junk (measured) 4235 feet Length Size Cemented MD TVD 110' 20" 250 sx Arcticset I (Approx.) 110' 110' 9222' 7" 2047 sx PF 'E', 263 sx 'G', 191 sx PF 'C' 9253' 4376' 981' 4-1/2" 46 sx Class'G' 8436'-9417' 3799'-4183' Perforation depth: measured 4-1/2" Slotted Liner: 9047' - 9373' 6" Open Hole Completion: 9417' - 12164' true vertical 4-1/2" Slotted Liner: 4147' - 4184' 6" Open Hole Completion: 4183' - 4235' Tubing (size, grade, and measUred depth) 4-1/2", 12.6#, L-80 to 8433' Packers and SSSV (type and measured depth) 4-1/2" Baker 'S-3' packer at 8398'; 7" x 4-1/2" Liner Top packer at 8421' (w/6' tieback) 13. Attachments [] Description Summary of Proposal 14. Estimated date for commencing operation Mamh 5, 2001 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Number: Mark Johnson, 564-5666 [] Detailed Operations Program [] BOP Sketch Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Numbec Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is correct to the best of my knowledge Signed Mark ~ .{~,. Title CT Drilling Engineer Date Conditions of Approval: Notify representative may witness %~'OO ~t t"~(~ "¥~%-~. Approval No. (--~-')1 - Plug integrity ~ BOP Test "~ Location clearance __ Mechanical Integrity Test Sub.se~teRt form required 10- ~'~ ~ order of the Commission ltor seamount Commissioner Date Form10-403 Rev. 06/15/88 N~ IRiNiAI Submit ln Triplicate Tree: 4.5" 5M Wellhead: 11" 5M FMC Gen 6 4.5' 8rd. EUE bottom and top, 4.5" ClW BPV profile. 20"91.1ppf, H-40 I 115' I MyU H-08a Orig. KB Elev. = 64.9' (N 22E) Orig. GL Bev. = 36.0' RT To Tbg. Spool = 30.6' (N 22E) KOP @ 300' Max. hole angle = 78 to 80 deg. f/3600' to 7450' Hole angle thru' perfs = Horizontal Proposed M and L1 (Post CTD) 4.5" 12.6 ppf,L-80 IBT mod tubing ( drift ID = 3.958", cap = 0.0152 bpf ) 7" 26 ppf, L-80, BTC mod production csg. ( drift ID = 6.276", cap. = 0.0383 bpf ) Milled 6-1/8" window at 8588'-8600' (12') 4.5" 12.6#, L-80 IBT Slotted liner from 9047'-9373', lB CTD sidetrack Sand 4.5' HES 'XD' sliding sleeve I I 3.813'1D shifts down to open I I 4.5' Baker S-3 packer I 8398' 4.5' HES XN nipple 3.725" idI 8421' Baker ZXP Liner top packer I 8421' w/6' tie back (5.25" ID) Baker 5"x7" HMC liner I 8436' (4.375' ID) Baker HMCV cement valve I 8961' Baker CTC 20' PZP ECP I 8979' L1 Second CTD sidetrack OB Sand TD 13302' ~, 3.75"Openhole / l CoiICADE estimated TD I -11800' both horizontals DATE 10-01-97 REV. BY JBF 3.75' Openhole TD 13095' 4.5" Baker drill~ guide shoe 19417' I Open hole to 12164' COMMENTS Drilled and Cased by Nabors 22E 6/20/98 M. Linder Frac and completion by Nabors 4-ES P&A well for sidetrack 4-ES Sidetrack completion for jet pump Proposed H-O8B & L1 (Post CTD) M. Linder M. Linder MOJ 12/19/99 1/19/O0 2/25/01 MILNE POINT UNIT WELL No: H-08A APl: 50-029-22808-01 BP EXPLORATION (AK) FEB Alaska Oil & Gas Co;,:i: · ::'., Anchorag(: To: WELL LOG TRANSMITTAL State of Alaska .Alaska Oil and Gas. Conservation Co.mm Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 iq MWD Fomtion Evaluation Logs - MPH-08A PB 1, March 02, 2000 AK-MM-90216 MPH-OSA PBh 2" x 5" ,MD Resistivity and Gamma Ray Logs: 50-029-22808-70 2"x 5" TVD Resistivity. and Gamma Ray Logs: 50-029-22808-70 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia PLEASE ACKNOWLEDGE RECEIFF BY SIGNING AND RETURNING THE ATFACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silvemdo Way, Suite G. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 RECEIVED DateL~hg~ 0 ~9 9_000 .Alaska 0il & (3a3" .... 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company 0 F:t I L-I_I ffi I~i S ~:: !::!~ I r' E S To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPH-O8& AK-MM-90216 February 24, 2000 MPH-08A: 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22808-01 2" x 5" TVD Resistiviw and Gamma Ray Logs: 50-029-22808-01 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia ~'LEASE ACKNOWLE. DGE RECEIFF BY SIGNING AND RETURNING THF~ A3~FACHED COPIES OF THE TRANSMITTAL LETTER TO THE A~ENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECEIVED Date}::~8 2 ? 2000 Alaska Oil & Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 . S ' 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company STATE OF ALASKA ALASKA OIL AND GAS OONSEFIVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well .... [] Oil [] Gas [-1 Suspended I~1 Abandoned i--I Service 2. 'Name of Operator ......... 7. Permit Nun~ber " BP Exploration (Alaska). Inc.... 199-122 ...... 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22808-01 4. Location of well at surface ' ~'~r~ ~ ' ~'",~' '- 9. Unit or Lease Name At top of productive interval [ ~~,_'~ i~~ 10. Well Number 875' SNL, 1978' NWL, SEC. 01, T12N, R10E, UM ~ V~;-:~L~ 'i; MPH-08A At tot,al depth ~!~ ~ 11 ' Field and Pool 3509 SNL, 3577' EWL, SEC. 01, T12N, R10E, UM Milne Point Unit / Schrader Bluff 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 65.68' AMSLI ADL 380109 12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband. 115. Water depth, if Offshore 118. NO,"Of Comple~i'0ns .... 01/04/00 I , 01/12/00 I, 01/18/00 ..... I N/A MSLI One 17. Total Dep{i~ (MD+TVD) ]18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth wher~ SSSV s'e{'l~)l. Tl~ickness of Permafrost 12164 4235 FTI 12164 4235 FTI [~Yes [--INo ! N/A MDI 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, PWD 23. '" CASIN% LINER AND CEMENTING 'RECORD CASING SE'I-rING DEPTH HOLE SIZE WT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# H-40 32' 110' 24" 250 sx Arctic Set (Approx.) 7" 26# L-80 31' 8588' 8-1/2" 2047 sx PF 'E', 263 sx 'G', 191 sx PF 'C' 4-1/2" 12.6# L-80 8436' 9417' 6" 46 sx Class 'G' , 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 6" Open Hole Completion 4-1/2", 12.6#, L-80 8433' 8398' MD TVD MD TVD .. 9047' - 9373' 4147' - 4184 9417' - 12164' 4183' - 4235' !26. ACID, FRACTURE, CEMENT ,.,-~QUEEZE, ETC. ,, ...... DEPTH iNTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 88 Bbls of' Diesel 27. PRODUCTION TEST .............. Date FirSt Production I Method of Operation (Flowing, gas lift, etc.) .... February 7, 2000 i Jet Pump Date of Test Hours Tested PRODUCTION FOR OIL-BBL G^s-MCF WATER-DEL CHOKE SIZE IGAs-OIL RA~'iO TEST PERIOD I Flow Tubing casing Pressure CALCULATE OIL-BBL G^s-McF WATER-BBL OIL GRAVITy'API (COBH) Press. D 24-HOUR 28. RATE CORE DATA Brief description of lithology, porosity, fractures, al~Pare~t"dips and presence of oil, gas or water. Submit c°'~; chiP~. ' RECEIVED ,,';3 23 .000 Form 10-407 Rev. 07-01-80 S-'-u'u'u'u'u'u'u'~~~plicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth SBF2- NA 8728' 3997' SBF1 - NB 8761' 4019' SBE4 - NC 8821' 4056' SBE2 - NE 8848' 4071' SBE1 - NF 8963' 4124' TSBD - OA 9068' 4152' TSBC 9200' 4181' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I her;by certify that'"ihe fo).eg;'i'"ng is true and .correct'to the besi"of my kn0'~ledge ................... Signed Terrie Hubble ,~ Title Technical Assistant III Date MPH-08A 199-122 Prepared By Name/Number: Terrie Hubble, 564-4626 Well Number Permit No. ! Approval No. .................... INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. RECEIVE[ Form 10-407 Rev. 07-01-80 Progress Report Facility M Pt H Pad Well MPH-08A Page 1 Rig Nordic3 Date 24 January 00 Date/Time 29 Dec 99 04:01-06:00 04:01-06:00 04:01-06:00 06:00-17:30 06:00-09:00 09:00 09:00-12:00 12:00 12:00-13:00 13:00 13:00-17:30 17:30 17:30-18:30 17:30-18:30 18:30 18:30-19:30 18:30-19:30 19:30 19:30-22:30 19:30-22:30 22:30 22:30-23:00 22:30-23:00 23:00 23:00-06:00 23:00-06:00 23:00-06:00 Duration 1-3/4 hr 1-3/4 hr 1-3/4 hr 11-1/2 hr 3 hr 3 hr 1 hr 4-1/2 hr 1 hr 1 hr 1 hr lhr 3 hr 3 hr 1/2 hr 1/2 hr 7 hr 7 hr 7 hr Activity Move rig Rig moved 50.00 % Finish moving rig to MP H-Pad. Top drive cooling radiator failed. Rig moved 50.00 % Move rig off MP J-08A. Clean up contaminated snow from previous seawater spill. PU herculite. Start move to MP H-08A. Move rig (cont...) Rig moved 95.00 % (cont...) Move rig off MP J-08A. Clean up contaminated snow from previous seawater spill. PU herculite. Start move to MP H-08A. Top drive failed - Change operation Held safety meeting Core on cooling radiator for top drive started leaking. Filled catch pan. Less than one gallon spilled to pad. Crew shut down move. Leak contained. Notifications made. Cleaned up contaminated snow & ice. Completed operations Rig moved 100.00 % Finish spotting rig on MP H-08A. At well location - Cellar Rig accepted @ 1300 hrs on 12/29/99. Rigged up Drillfloor / Derrick Level rig. Berm and spot ancillary equipment. Stopped due to weather: Whiteout / Phase 3 Suspend operations Rig waited: Whiteout / Phase 3 Change out crew with convoy. Resumed operations Wellhead work Rigged down Xmas tree ND tree & adapter. Equipment work completed Nipple up BOP stack Rigged up BOP stack NU drlg spool & BOPE. Install riser & mousehole. Equipment work completed Test well control equipment Tested BOP stack Function tested BOPE. No test plug or TWC on location due to Phase 3 conditions. Function test completed satisfactorily Suspend operations Rig waited: Whiteout / Phase 3 Tried to stay busy during whiteout. Change out tongs. Plow drifts & move 3.5" DP. Reviewed Unit 4- Training. Load pipe shed w/3.5" DP. Tally pipe. Cleaning up rig. Rig waited' Whiteout / Phase 3 Continue cleaning and painting rig. Pull top driw. radiator core out a,n,d plumb bypass. Test run-Oi~i~,~. {~[l~,~ ~F~n~i.?_h l~o_a~i:n~go_3.o5_ p_.P.. ~l~e~.r_don_' f!s~.t.o._M~P..J.-p_a..d.~ Facility M Pt H Pad Progress Report Well MPH-08A Page 2 Rig Nordic3 Date 24 January 00 Date/Time 30 Dec 99 31 Dec 99 O1 Jan O0 06:00-06:00 06:00-00:00 00:00 00:00-06:00 00:00-06:00 00:00-06:00 06:00-06:00 06:00-06:00 06:00-07:30 06:00-07:30 07:30 07:30-16:00 07:30-16:00 16:00 16:00-17:30 16:00-17:30 17:30 17:30-18:30 17:30-18:30 18:30 18:30-21:30 18:30-21:30 21:30 21:30-01:00 21:30-22:00 22:00 22:00-00:30 Duration 24 hr 18hr 6 hr 6 hr 6 hr 24 hr 24 hr 1-1/2 hr 1-1/2 hr 8-1/2 hr 8-1/2 hr 1-1/2 hr 1-1/2 hr 1 hr 1 hr 3 hr 3 hr 3-1/2 hr 1/2 hr 2-1/2 hr Activity motors & mwd tools in pipe shed. Spill & Fire Suspend operations (cont...) Rig waited: Whiteout ! Phase 3 (cont...) Continue cleaning and painting rig. Pull top drive radiator core out and plumb bypass. Test run-OK. Finish loading 3.5" DP. Clear drifts to MP J-Pad. Move Baroid & Sperry shacks & set up. Put mud motors & mwd tools in pipe shed. Spill & Fire Drills. Began precautionary measures Rig waited: Whiteout ! Phase 3 Continue maintainence. Crew change w/convoy. Rig waited: Whiteout / Phase 3 Tested gas monitors. Continue maint, cleaning & painting. Convoy crew changes to MPU base camp. Rig waited: Whiteout / Phase 3 Service TD. Cut & slip Drlg line. Clean & paint rig. Convoyed crews & fuel truck from MP Base Camp. Suspend operations (cont...) Rig waited: Whiteout / Phase 3 (cont...) Service TD. Cut & slip Drlg line. Clean & paint rig. Convoyed crews & fuel truck from MP Base Camp. Suspend operations (cont...) Rig waited: Whiteout / Phase 3 (cont...) Service TD. Cut & slip Drlg line. Clean & paint rig. Convoyed crews & fuel truck from MP Base Camp. Resumed operations Derrick management Racked back drill pipe PU & MU 3.5" DP. Receive whipstock, mills, MWD probe, & MWD engineer by roligon. D1 Drill-OS- 1:15 min. 237 joints picked up BHA run no. 1 Made up BHA no. 1 Start loading BHA in pipe shed. Stopped: To hold safety meeting Suspend operations Rig waited: Whiteout / Phase 2 Crew change with convoy. Resumed operations BHA run no. 1 Made up BHA no. 1 Continue loading BHA, HWDP, & DC's. Spot cuttings box. Take on fuel & water. BHA no. 1 made up Test well control equipment Installed BOP test plug assembly Eqpt. work completed, running tool retrieved Tested BOP stack Test BOPE to 250 ! 2000 psi. Left messages on Anch AOGCC answering machines with no response. Facility M Pt H Pad Progress Report Well MPH-08A Page 3 Rig Nordic3 Date 24 January 00 Date/Time 02 Jan 00 03 Jan 00 00:30 00:30-01:00 01:00 01:00-06:00 01:00-03:30 03:30 03:30-04:30 04:30 04:30-05:00 05:00 05:00-06:00 06:00-14:00 06:00-06:30 06:30 06:30-08:30 08:30 08:30-10:00 10:00 10:00-13:00 13:00 13:00-14:00 14:00 14:00-06:00 14:00-14:30 14:30 14:30-15:00 15:00 15:00-18:30 18:30 18:30-00:00 00:00 00:00-01:00 O1:00 O1:00-02:00 02:00 02:00-05:30 05:30 Duration 1/2 hr 5 hr 2-1/2 hr 1 hr 1/2 hr 1 hr 8 hr 1/2 hr 2 hr 1-1/2hr 3 hr 1 hr 16hr 1/2 hr 1/2 hr 3-1/2 hr 5-1/2 hr 1 hr 1 hr 3-1/2 hr Activity Pressure test completed successfully - 2000.000 psi Installed Wear bushing Pull test plug. Set wear ring Eqpt. work completed, running tool retrieved BHA run no. 1 Made up BHA no. 1 PU &MU 12 DC's & 32jts HWDP. BHA no. 1 made up R.I.H. to 2241.0 ft D 1 Drill-OS-45 sec. Stopped: To circulate Circulated at 2241.0 ft Circulate diesel out of well w/hot water. Hole displaced with Water - 120.00 % displaced R.I.H. to 4000.0 ft BHA run no. 1 (cont...) Serviced Crown block Equipment work completed R.I.H. to 8608.0 ft Tagged retainer @ 8608 DPM. On bottom Circulated at 8608.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 1465.0 ft At BHA Pulled BHA LD drlg jars. BHA Stood back BHA run no. 2 Made up BHA no. 2 PU & load MWD. Stopped: To hold safety meeting Held safety meeting PreSpud meeting w/Nordic crew, Co Rep, Geologists, Sperry directional and MWD, & Baker Fishing. Completed operations Made up BHA no. 2 MU whipstock & bumper sub. Bumper sub not opening-change out. RIH w/BHA #2-Slow. Test MWD. BHA no. 2 made up R.I.H. to 8608.0 ft Blow down. Fill pipe @ 3900' & 6320'. On bottom Functioned downhole tools at 8608.0 ft Break circ. Orient & set whipstock 54 deg Right of Hi. Equipment work completed Circulated at 8590.0 ft  Pump Hi-Vis spacer. Displace well to milling fluid. Hole displaced with Water based mud - 120.00 % displaced Milled Casing at 8617.0 ft RECE Milled window f/8588' to 8600'. Milled 17' formation to 8617'. Sweeps as required. Completed operations brED 000 Progress Report Facility M Pt H Pad Well MPH-08A Page 4 Rig Nordic3 Date 24 January 00 Date/Time 04 Jan 00 05 Jan 00 05:30-06:00 05:30-06:00 06:00-14:30 06:00-08:00 08:00 08:00-12:00 12:00 12:00-14:30 14:30 14:30-06:00 14:30-19:30 19:30 19:30-02:30 02:30 02:30-03:30 03:30 03:30-05:30 05:30 05:30-06:00 06:00-06:00 06:00-02:30 02:30 02:30-03:30 03:30 03:30-04:00 04:00 04:00-06:00 06:00 Duration 1/2 hr 1/2 hr 8-1/2 hr 2 hr 4 hr 2-1/2 hr 15-1/2 hr 5 hr 7 hr 1 hr 2 hr 1/2 hr 24 hr 20-1/2 hr lhr 1/2 hr 2 hr Activity Circulated at 8617.0 ft Circ sweeps while rotate & reciprocate through window. Circulated at 8617.0 ft Continue Circ and pump sweeps while rotating & reciprocating pipe through window @ 8588' to 8600' BHA run no. 2 (cont...) Circulated at 8617.0 ft (cont...) Continue Circ and pump sweeps while rotating & reciprocating pipe through window @ 8588' to 8600' Obtained clean returns - 250.00 % hole volume Pulled out of hole to 850.0 ft Blow down top drive, Mix and pump dry job. POOH to BHA Monitor well for 10 min O.K. At BHA Pulled BHA Pull and stand back BHA. Lay down window mills, Top mill in full 6" gauge. Should have a good window. Completed operations BHA run no. 3 Made up BHA no. 3 Change out MWD. M/U up/load tool, M/U BHA #3 RIH test MWD O.K. BHA no. 3 made up R.I.H. to 8435.0 ft RIH P/U 102 3-1/2" DP f/pipe shed, Run 24 stands out of derrick. P/U 27 jt's 3-1/2" HWDP. Stopped: To service drilling equipment Serviced Block line Slip & cut drilling line 50' Equipment work completed R.I.H. to 8570.0 ft RIH w/2 std's HWDP Orient MWD tool. Slid throt window @ 8588' to 8600' Tag up @ 8620' On bottom Drilled to 8630.0 ft Slid & drill out window BHA run no. 3 (cont...) Drilled to 9449.0 ft Directional drill 6" hole from 8630' to 9449' horizontal. Pumped 3 sweeps. Continue drilling "OA" sand top @ 9220' MD 4156' TVD. Started scheduled wiper trip: due to Footage drilled Circulated at 9449.0 ft Pumped sweep and circulated up in to 7" casing. String displaced with Lo/Hi vis combination - 125.00 % displaced Pulled out of hole to 8712.0 ft Pull up to 8712' to circulate out sweeps from 7" casing. Stopped: To circulate Circulated at 8712.0 ft Circulate out sweeps and clean up 7" casing. 130 spm @ 2640 psi Obtained bottoms up (100% annulus volume) Progress Report Facility M Pt H Pad Well MPH-08A Page 5 Rig Nordic3 Date 24 January 00 Date/Time 06:00-06:00 06:00-07:30 07:30 07:30-08:30 08:30 08:30-10:00 10:00 10:00-11:00 11:00 11:00-12:30 12:30 12:30-19:30 19:30 19:30-20:30 20:30 20:30-02:00 06 Jan 00 02:00 02:00-02:30 02:30 02:30-05:00 05:00 05:00-06:00 06:00 06:00-06:00 06:00-13:00 13:00 13:00-15:00 15:00 Duration 24 hr 1-1/2 hr 1 hr 1-1/2 hr 1 hr 1-1/2 hr 7 hr 1 hr 5-1/2 hr 1/2 hr 2-1/2 hr lhr 24 hr 7 hr 2 hr Activity BHA run no. 3 (cont...) Pulled out of hole to 7650.0 ft POOH Mad pass f/8650' to8500'. Continue to POOH stand back HWDP to 7650' Stopped · To pick up/lay out tubulars R.I.H. to 8640.0 ft RIH w! 10 stands of 3-1/2" DP and 1 stand of HWDP @ 8640' Stopped: To circulate Circulated at 8640.0 ft Circulate and take on 600 bbls of 9.1 ppg BARADRILn drlg fluid. Obtained clean returns - 150.00 % hole volume R.I.H. to 9449.0 ft RIH tag bottom. On bottom Circulated at 9449.0 ft Circulate, reciprocat, Pump sweeps and change over to new BARADRILn 9.1 ppg drilling fluid. Rotate and reciprocate Obtained req. fluid properties - 120.00 %, hole vol. Drilled to 9765.0 ft Continue drilling 6" horizontal hole f/9449' to 9765' Stopped: To circulate Circulated at 9765.0 ft Pump Hi-Vis Hi-Wt sweep. Rotate & reciprocate ECD increased f/11.1 to 11.5 ppg and droped back to 11.15 ppg. Obtained clean returns - 200.00 % hole volume Drilled to 10042.0 ft Drlg 6" horizontal hole f/9765' to 10042'. Stopped :To circulate Circulated at 10042.0 ft Pump Hi-Vis Hi-Wt sweep ECD increased f/11.2 to 11.9 ppg droped back to 11.25 ppg Obtained clean returns - 125.00 % hole volume Drilled to 10082.0 ft continue drlg to 10,082' Trying to slide Unable to make drill string slide. Starting to see some sticking signs from differential. Stopped: To circulate Circulated at 10082.0 ft Pump Hi-Vis Hi-Wt sweep Obtained clean returns - 125.00 % hole volume BHA run no. 3 (cont...) Drilled to 10411.0 ft Continue drilling from 10,082' to 10,411 ', taking survey every 30'. Began precautionary measures Circulated at 10411.0 ft Circulate and work drill pipe. Pump hi-wate, hi-vis sweeps. Obtained clean returns - 125.00 % hole volume · Progress Report Facility M Pt H Pad Well MPH-08A Page 6 Rig Nordic3 Date 24 January 00 Date/Time 15:00-21:30 21:30 21:30-22:30 22:30 22:30-06:00 07 Jan 00 06:00-06:00 06:00-08:00 08 Jan 00 08:00 08:00-10:00 10:00 10:00-11:30 11:30 11:30-14:30 14:30 14:30-18:30 18:30 18:30-19:30 19:30 19:30-21:30 21:30 21:30-22:00 22:00 22:00-23:00 23:00 23:00-00:30 23:30 00:30 00:30-03:30 03:30 03:30-06:00 06:00-12:00 06:00-06:30 Duration 6-1/2 hr 1 hr 7-1/2 hr 24 hr 2 hr 2 hr 1-1/2 hr 3 hr 4 hr 1 hr 2 hr 1/2 hr 1 hr 1-1/2 hr 3 hr 2-1/2 hr 6 hr 1/2 hr Activity Drilled to 10702.0 ft Pump sweep while drilling. Began precautionary measures Circulated at 10702.0 ft Reciprocate and circulate out sweep at 6 bpm. Obtained clean returns - 125.00 % hole volume Drilled to 10990.0 ft Pumping sweeps while drilling, taking surveys every 30 ft. Looking for the top of sand before sidetracking. BHA run no. 3 (cont...) Drilled to 11091.0 ft Continue drilling from 10,990' to 11,091'. Pump sweep at 10,993'. Reached depth prior to side-track Circulated at 11091.0 ft Pump sweep and circulate. Obtained clean returns - 100.00 % hole volume Pulled out of hole to 8858.0 ft At Kick off depth - 9052.0 ft Drilled to 9030.0 ft Rig up for sidetrack, RIH to 9030', and begin sidetracking open hole. Began precautionary measures Drilled to 9090.0 ft Timed drilling at 10'/hr to 9090'. Mud pumps failed - Change operation Lost prime to rig pumps. Serviced Mud pumps Cycle pumps and survey. Equipment work completed Drilled to 9160.0 ft Continue drilling to 9160', sliding, surveying every tool joint. Stopped · To take survey Took MWD survey at 9160.0 ft Acceptable survey obtained at 9160.0 ft Drilled to 9224.0 ft Rotate from 9160 to 9170', slide to 9224'. Stopped · To take survey Took MWD survey at 9224.0 ft Acceptable survey obtained at 9224.0 ft Began precautionary measures Wait on Geologist. Hole angle too low to land well in OA sand. Circulated at 8740.0 ft POH to 8740', Circulate and pump Hi-vis, Hi-weight sweep. Pump dry job. Heavy slug spotted downhole Pumped dry job. Pulled out of hole to 3000.0 ft POOH for bit trip. BHA run no. 3 (cont...) Serviced Top drive Facility M Pt H Pad Progress Report Well MPH-08A Page 7 Rig Nordic3 Date 24 January 00 Date/Time 09 Jan O0 06:30 06:30-09:00 09:00 09:00-11:30 11:30 11:30-12:00 12:00 12:00-15:00 12:00-15:00 15:00 15:00-06:00 15:00-16:00 16:00 16:00-19:30 19:30 19:30-00:00 00:00 00:00-00:30 00:30 00:30-06:00 06:00 06:00-06:00 06:00-08:30 08:30 08:30-16:00 16:00 16:00-17:00 17:00 17:00-18:30 18:30 Duration 2-1/2 hr 2-1/2 hr 1/2 hr 3 hr 3 hr 15hr 1 hr 3-1/2 hr 4-1/2 hr 1/2 hr 5-1/2 hr 24 hr 2-1/2 hr 7-1/2 hr 1 hr 1-1/2 hr /A ~~Activity Equipment work completed Pulled out of hole to 90.0 ft At BHA lled BHA Break down BHA and pull wear ring. Laid out Service~d Top drive Check top drive for loose fittings. Equipment work completed Test well control equipment Tested BOP stack Function test completed satisfactorily BHA run no. 4 Serviced Top drive Inspect Top Drive with Tesco Rep. Equipment work completed Made up BHA no. 4 PFLI mud motor and m/u bit. P/U and up load MWD. RIH w/flex collars, jars, 2 stds. DP and Accelerator. Corrosion ring is in. K/U and test MWD. Blow down top drive. BHA no. 4 made up R.I.H. to 8927.0 ft Survey and orient tool face. At Kick off depth · 9030.0 ft ~ R.I.H. to 9224.0 ft RIH w/HWDP, k/u on stand 4/8 and break circulation. Take survey. ~- On bottom Drilled to 9405.0 ft Slide drill, building angle, looking for sand. Found sand at +/-9347' with +/- 150' outside sand. Maximum dogleg = 17 degrees. Began precautionary measures Stopped to swap out mud. BHA run no. 4 (cont...) Pulled out of hole to 8578.0 ft Circulate and clean hole. Pull back inside window to clean pits. At 7in casing shoe Serviced Fluid system Clean mud pits and take on 570 bbls of 9.1 ppg, 6% KC1 Baradril-N mud. One hour loss while waiting on trucking. Equipment work completed R.I.H. to 9404.0 ft RIH w/stds. Had to rotate through 9070' at top of the "OA" sand. On bottom Circulated at 9404.0 ft Break circulation, rotate and work pipe while pumping weighted hi-vis sweep. Swap out mud. Obtained clean returns - 100.00 % hole volume m ITl Facility M Pt H Pad Progress Report Well MPH-08A Page 8 Rig Nordic3 Date 24 January 00 Date/Time 10 Jan O0 11 Jan 00 12 Jan 00 18:30-06:00 06:00-06:00 06:00-21:30 21:30 21:30-23:00 23:00 23:00-01:00 01:00 01:00-02:30 02:30 02:30-06:00 06:00-06:00 06:00-12:00 12:00 12:00-13:30 13:30 13:30-20:30 20:30 20:30-21:30 21:30 21:30-03:30 03:30 03:30-05:00 05:00 05:00-06:00 06:00-06:00 06:00-17:00 17:00 17:00-00:15 Duration 11-1/2 hr 24 hr 15-1/2 hr 1-1/2 hr 2 hr 1-1/2 hr 3-1/2 hr 24 hr 6 hr 1-1/2 hr 7hr 1 hr 6 hr 1-1/2 hr lhr 24 hr llhr 7-1/4 hr Activity Drilled to 9904.0 ft Drill ahead according to plan, surveying every tool joint. Pump sweep at 9744'. Entire interval in sand. BHA run no. 4 (cont...) Drilled to 10517.0 ft Continue drilling from 9904' to 10,517', surveying every joint. ECD = 11.34 ppg, up wt = 100k, dn wt = 60k, rot wt = 80k Started scheduled wiper trip: due to Footage drilled Pulled out of hole to 8771.0 ft Short trip 18 stands HWDP. Stopped · To circulate Circulated at 8771.0 ft Pump Hi-vis sweep. ECD = 11.18 ppg. POOH 2 stands to window to shuffle HWDP. Obtained clean returns - 100.00 % hole volume R,.I.H. to 10517.0 ft Add 11 stands of 3.5" DP under HWDP. On bottom Drilled to 10654.0 ft Drilling ahead at report time. ECD = 11.55 ppg. BHA run no. 4 (cont...) Drilled to 11024.0 ft ECD = 11.5 while rotating. Stopped · To circulate Circulated at 11024.0 ft Pump sweep and displace to new mud. ECD dropped 11.3 ppg. Obtained req. fluid properties - 100.00 %, hole vol. Drilled to 11383.0 ft Stopped · To circulate Circulated atl1383.0 ft Pump sweeps. The before/peak/and after ECD va were 11.5/11.8/11.45 ppg. Obtained clean returns - 100.00 % hole volume Drilled to 11681.0 ft Stopped · To circulate Circulated at 11681.0 ft Pump sweeps. Before/peak/and after ECD's = 11.56/12.0/11.56 ppg. Obtained bottoms up (100% annulus volume) Both sweeps carried large quantities of cuttings over shakers. Drilled to 11760.0 ft Drilling ahead at report time. BHA run no. 4 (cont...) Drilled to 12164.0 ft ECD = 11.6 ppg Reached planned end of run - Section / well T.D. Circulated at 12164.0 ft Pumped 3 sets of sweeps: 1) weighted followed by hi-vis, 2) weighted followed by hi-vis, 3) hi-vis. 111~., UGItJlGllJGO,.INJgl-IIU-gl. It,G1 13~,_.L~ I Facility M Pt H Pad Progress Report Well MPH-08A Page 9 Rig Nordic3 Date 24 January 00 Date/Time 13 Jan 00 14 Jan 00 00:15 00:15-01:15 01:15 01'15-05:00 05:00 05:00-06:00 06:00-22:00 06:00-07:00 07:00 07:00-07:30 07:30 07:30-10:00 10:00 10:00-10:30 10:30 10:30-11:00 11:00 11:00-12:30 12:30 12:30-19:00 19:00 19:00-20:00 20:00 20:00-21:30 21:30 21:30-21:45 21:45 21:45-22:00 22:00 22:00-06:00 22:00-22:30 22:30 22:30-23:30 23:30 23:30-01:30 01:30 01:30-02:00 02:00 02:00-05:15 Duration 1 hr 3-3/4 hr 1 hr 16hr 1 hr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 6-1/2 hr 1 hr 1-1/2 hr 1/4 hr 1/4 hr 8 hr 1/2 hr 1 hr 2 hr 1/2 hr 3-1/4 hr Activity 1) 11.6/12.1/11.6 Obtained clean returns - 500.00 % hole volume Circulated at 12164.0 ft Spot 120 bbls new mud in hole. Hole displaced with Water based mud - 40.00 % displaced Pulled out of hole to 8490.0 ft Short trip into casing. At 7in casing shoe Serviced Draw works BHA run no. 4 (cont...) Serviced Block line Cut 48.75'. D4 Drill. Line slipped and cut R.I.H. to 8780.0 ft RIH below window. At Window · 8588.0 ft Circulated at 8788.0 ft Circ while rotate & reciprocate. Pump two sets of sweeps to clean up casing. Hole swept with slug - 250.00 % hole volume R.I.H. to 8925.0 ft Rot & circ thru tight spot @ 8925'. Take survey @ 8927'. Observed 5000.00 klb resistance R.I.H. to 9500.0 ft Stopped · To circulate Circulated at 9500.0 ft Circ one set of sweeps while rotate & reciprocate. Cleaned up good. Hole swept with slug - 120.00 % hole volume Pulled out of hole to 194.0 ft At BHA Downloaded MWD tool Completed operations Pulled BHA BHA Laid out Singled in drill pipe to 180.0 ft MU 6 DC's 6 joints picked up Pulled out of hole to 0.0 ft At Surface · 0.0 ft Run Liner, 4-1/2in O.D. Installed Casing handling equipment Equipment work completed Held safety meeting PJSM on running Bonzai liner and inner string. Completed operations Ran Liner to 969.0 ft (4-1/2in OD) Ran total of 8 jts slotted & 14 jts solid liner. D2 Drill-OS 30 sec. Stopped · To change handling equipment Installed Tubing handling equipment RU to run inner string. Equipment work completed Ran Tubing to 840.0 ft (2-7/8in OD) Tagged up at wrong ~pot. Facility M Pt H Pad Progress Report Well MPH-08A Page 10 Rig Nordic3 Date 24 January 00 Date/Time 15 Jan 00 05:15 05' 15-06:00 06:00-08:00 06:00-08:00 08:00 08:00-09:30 08:00-09:30 09:30 09:30-01:00 09:30-10:30 10:30 10:30-11:00 11:00 11:00-19:00 19:00 19:00-21:00 21:00 21:00-22:30 22:30 22:30-01:00 01:00 01:00-06:00 01:00-02:30 02:30 02:30-03:00 03:00 03:00-03:30 03:30 03:30-05:30 Duration 3/4 hr 2 hr 2 hr 1-1/2 hr 1-1/2 hr 15-1/2 hr 1 hr 1/2 hr 8 hr 2 hr 1-1/2 hr 2-1/2 hr 5 hr 1-1/2 hr 1/2 hr 1/2 hr 2 hr Activity Began precautionary measures Held safety meeting Counted all pipe in pipe shed. Nine its of slotted should have been run, but only eight were actually run. Contacted Anchorage SSD & Well Team Leader. Liner shoe OK as is. Prep to pull & re-space inner string. Pull Tubing, 2-7/8in O.D. Pulled Tubing in stands to 0.0 ft POH w/inner string. Respace. Check cup tool & slick stick. Retrieved 0.0 ft from Other sub-surface equipment Run Tubing, 2-7/8in O.D. Ran Tubing in stands to 971.0 ft Verify position & space out. MU hanger & liner top packer. Locator seal assembly installed Run Liner, 4-1/2in O.D. Rigged up Drillstring handling equipment LD tbg tools. RU DP tools. Equipment work completed Circulated at 996.0 ft Circ liner volume. D1 Drill-OS-l:15 min. Obtained req. fluid properties - 100.00 %, hole vol. Ran Liner on landing string to 8520.0 ft RIH w/DC & HWDP (drift). Run 3.5" DP. All pipe @ 3 min / std. PU-95k; SO-60k. At Window: 8588.0 ft Circulated at 8520.0 ft Circ & cond mud @ 1.5 bpm w/630 psi. Obtained req. fluid properties - 200.00 %, hole vol. Ran Liner on landing string to 9417.0 ft PU: 130k; SO: 75k. At Setting depth: 9417.0 ft Circulated at 9417.0 ft RU cement head. Circ & cond mud. Fire Drill-OS-45 sec. Obtained req. fluid properties - 120.00 %, hole vol. Cement: Liner cement Functioned Liner hanger Drop ball & circ down. Set hanger w/1500 psi. Slack off 35k-OK. Release HR running tool. Test PPIT to 1000 psi-OK. Equipment work completed Held safety meeting PJSM w/Dowell, rig crew & Baker. Completed operations Rigged down Cement head RD cement hd. LD 1 jt. RU cement hd. Equipment work completed Functioned Inflatable packer Inflate ECP w/total of 1 bbl mud. Shear ball seat w/3700 psi. Break connection & drop wiper plug. 1"} ..... 1..~ fl ..... O- ~1~ ~1 ..... .'~ r~Tl,~'n BIT 0 ..... Facility M Pt H Pad Progress Report Well MPH-08A Page 11 Rig Nordic3 Date 24 January 00 Date/Time 16 Jan 00 05:30 05:30-06:00 06:00-09:00 06:00-06:30 06:30 06:30-07:00 07:00 07:00-08:15 08:15 08:15-08:30 08:30 08:30-09:00 09:00 09:00-17:00 09:00-11:00 11:00 11:00-13:30 13:30 13:30-14:30 14:30 14:30-15:00 15:00 15:00-16:00 16:00 16:00-17:00 17:00 17:00-05:00 17:00-17:30 17:30 17:30-19:30 19:30 19:30-00:30 00:30 00:30-01:30 Duration 1/2 hr 3 hr 1/2 hr 1/2 hr 1-1/4 hr 1/4 hr 1/2 hr 8 hr 2 hr 2-1/2 hr 1 hr 1/2 hr 1 hr 1 hr 12hr 1/2 hr 2 hr 5 hr 1 hr Activity position @ HMCV. Shear open w/2200 psi. Equipment work completed Circulated at 8960.0 ft Circ @ 2 bpm w/660 psi. Batch mix cement. Cement: Liner cement (cont...) Mixed and pumped slurry - 9.500 bbl Pumped 10 bbls spacer, 9.5 bbls ( 46 sxs ) 15.8 ppg Premium 'G', followed by 2 bbls spacer. Tail cement pumped Displaced slurry - 54.500 bbl Dowell displaced with mud. Under displace 1/2 bbl. Close HMCV. Release pressure-no flowback. Pressure to 3300 psi & bleed off. SO & reverse 2 bbls to Dowell. Slurry at required depth, stopped the displacement Circulated at 9020.0 ft Pressure to 4700 psi to shear inflation tool dump valve. Circ & recip 5800 stks. PH indicated some spacer recovered. Obtained clean returns - 150.00 % hole volume Rigged down Cement head Equipment work completed Functioned Liner hanger Set liner top packer. Test annulus to 1000 psi-OK. Equipment work completed Pull HWDP, 3-1/2in O.D. Laid down 1260.0 ft of HWDP LD single. Pull 1 std. Pump dry job. Blow down. LD 42 HWDP. 42 joints laid out Pulled Drillpipe in stands to 1900.0 ft Stopped: To pick up/lay out tubulars Laid down 930.0 ft of HWDP LD 18 HWDP & 12 DC. 30 joints laid out Rigged up Tubing handling equipment Equipment work completed Laid down 960.0 ft of Tubing LD inner string & Baker Tools. Completed operations Rigged up Drillstring handling equipment Clear pipe shed & floor. RU to run DP. Work completed - Drillstring handling equipment in position BHA run no. 5 Made up BHA no. 5 Bit, scraper, 6-DC's, & Jars. D1 Drill-OS-30 secs. BHA no. 5 made up R.I.H. to 8421.0 ft At Top of liner: 8421.0 ft Circulated at 8419.0 ft Circ Lo Vis followed by Hi Vis sweeps while rotating down & reciprocating up. Hole swept with slug - 150.00 % hole volume Functioned Retrievable packer Set Storm Packer @ 35'. Bit depth 8400'. Test packer to .... psi. Facility M Pt H Pad Progress Report Well MPH-08A Page Rig Nordic3 Date 12 24 January O0 Date/Time 01:30 01:30-02:00 02:00 02:00-05:00 05:00 05:00-06:00 05:00-06:00 05:00-06:00 06:00-06:30 06:00-06:30 06:30 06:30-08:30 06:30-07:30 07:30 07:30-08:30 08:30 08:30-10:00 08:30-10:00 10:00 10:00-12:00 10:00-10:30 10:30 10:30-12:00 12:00 12:00-12:30 12:00-12:30 12:30 12:30-16:00 12:30-13:30 13:30 13:30-16:00 16:00 16:00-20:00 16:00-20:00 20:00 20:00-06:00 20:00-21:30 21:30 Duration 1/2 hr 3 hr 1 hr 1 hr 1 hr 1/2 hr 1/2 hr 2 hr 1 hr 1 hr 1-1/2 hr 1-1/2 hr 2 hr 1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 3-1/2 hr I hr 2-1/2 hr 4 hr 4 hr 10hr 1-1/2 hr Activity Equipment work completed Held safety meeting PJSM on Annular work. Completed operations Serviced Annular preventor Replace bonnet seal. Equipment work completed Nipple down BOP stack Rigged down BOP stack ND BOPE. Rigged down BOP stack Abandon Rig Drill-OS-1 min. Nipple down BOP stack (cont...) Rigged down BOP stack (cont...) · Abandon Rig Drill-OS- 1 min. Work completed, equipment laid out Wellhead work Removed Tubing head spool Equipment work completed Installed Spacer spool Equipment work completed Nipple up BOP stack Rigged up BOP stack Work completed - BOP stack in position Test well control equipment Installed BOP test plug assembly Set test plug & function test BOPE. Equipment work completed Tested BOP stack Test BOPE to 250 / 2000 psi. Witnessing waived by John Spaulding-AOGCC Field Inspector. D4 Drill. Pressure test completed successfully - 2000.000 psi Wellhead work Installed Wear bushing Pull test plug. Set wear ring. Eqpt. work completed, running tool retrieved BHA run no. 5 Functioned Retrievable packer Pull & LD storm packer. Equipment work completed Circulated at 8421.0 ft Tag TOL. Circ sweep & spacer. Displace hole to 8.9# brine. Hole displaced with Brine - 100.00 % displaced Suspend operations Circulated at 8421.0 ft Circ & wait on brine truck. All trucks tied up elsewhere. Stopped: To circulate BHA run no. 5 Circulated at 8421.0 ft Pump sweep. Displace well w/clean brine. Hole displaced with Brine - 110.00 % displaced Facility M Pt H Pad Progress Report Well MPH-08A Page 13 Rig Nordic3 Date 24 January 00 Date/Time 17 Jan O0 18 Jan 00 21:30-04:30 04:30 04:30-05:45 05:45 05:45-06:00 06:00-09:00 06:00-08:00 08:00 08:00-09:00 09:00 09:00-11:00 09:00-09:30 09:30 09:30-10:30 10:30 10:30-10:45 10:45 10:45-11:00 11:00 11:00-21:00 11:00-11:30 11:30 11:30-21:00 21:00 21:00-22:30 21:00-22:00 22:00 22:00-22:30 22:30 22:30-00:00 22:30-00:00 00:00 00:00-02:30 00:00-01:30 01:30 01:30-02:30 02:30 02:30-05:00 02:30-05:00 Duration 7 hr 1-1/4 hr 1/4 hr 3 hr 2 hr 1 hr 2 hr 1/2 hr 1 hr 1/4 hr 1/4 hr 10hr 1/2 hr 9-1/2 hr 1-1/2 hr 1 hr 1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 1-1/2 hr 1 hr 2-1/2 hr 2-1/2 hr Activity Laid down 8205.0 ft of 3-1/2in OD drill pipe D1 Drill-OS-30 sec. At BHA R.I.H. to 2810.0 ft RIH w! 28 stds f/derrick. Stopped · To pick up/lay out tubulars Laid down 100.0 ft of 3-1/2in OD drill pipe H2S Drill-OS-l:15 min. BHA run no. 5 (cont...) Laid down 2600.0 ft of 3-1/2in OD drill pipe (cont...) H2S Drill-OS-l:15 min. At BHA Pulled BHA BHA Laid out Wellhead work Installed BOP test plug assembly Pull wear ring. Set test plug. Equipment work completed Installed BOP stack Change top rams to 4.5". Equipment work completed Tested Top ram Test rams to 250 / 2000 psi-OK. Pressure test completed successfully - 2000.000 psi Removed BOP test plug assembly Equipment work completed Run Other completion type completion, 4-1/2in O.D. Held safety meeting PJSM on running completion. Completed operations Ran Tubing to 8432.0 ft (4-1/2in OD) MU Baker 'S-3' packer assembly and HES 'XD' sliding sleeve assembly. RIH on 202 jts 4.5", 12.6#, L-80 IBT-Mod tbg. Buried space out pups. Hanger landed Wellhead work Functioned Tubing bonnet RILDS. Clear floor. Equipment work completed Rigged up Hanger plug B/O landing jt. Set TWC. Drain stack. Equipment work completed Nipple down BOP stack Rigged down BOP stack Work completed, equipment laid out Wellhead work Installed Xmas tree NU tbg hd adapter & tree. Equipment work completed Tested Xmas tree Test hanger, adapter & tree to 250 / 5000 psi-OK. Pressure test completed successfully - 5000.000 psi Fluid system Freeze protect well - 88.000 bbl of Diesel r)IT !..~- ~.'1 ~- .... 1. B ..........I-'~_1 .-! .......... 1..~ Facility M Pt H Pad Progress Report Well MPH-08A Page 14 Rig Nordic3 Date 24 January 00 Date/Time 05:00 05:00-06:00 05:00-06:00 06:00-09:30 06:00-08:00 08:00 08:00-09:30 09:30 09:30-06:00 09:30-11:00 11:00 11:00-12:00 12:00 Duration 1 hr 1 hr 3-1/2 hr 2hr 1-1/2 hr 20-1/2 hr 1-1/2 hr ' 1 hr Activity taking returns out tubing. Shut down and U-tube diesel. Completed operations Run Other completion type completion, 4-1/2in O.D. Functioned Permanent packer Drop setting ball for packer. WO ball to fall. Run Other completion type completion, 4-1/2in O.D. (cont...) Functioned Permanent packer Wait on ball to fall. Circ slow down tbg @ 1 bpm TBG 1000 psi, Annulus 800 psi. Incease rate to 2 bpm pump total of 88 bbl's. Still could not bump ball. TBG 1120 psi, annulus 800 psi. Shut down will have wire line push ball down after rig released. Equipment work completed Installed Hanger plug Install BVP w/lubicator Equipment work completed Move rig Rigged down High pressure lines Raise rig move off well Work completed, equipment laid out Rigged down Scaffolding Remove old well head, Mats and pit liner. Clean up around location. Rlease rig @ 1200 hrs 01/18/2000 Equipment work completed North Slope Alaska Alaska State Plane 4 Milne Point MPH MPH-O8APB1 Surveyed: 7 January, 2000 SURVEY REPORT ORIGINAL 25 January, 2000 Your Ref: API-500292280870 Surface Coordinates: 6009918.79 N, 556584.41 E (70° 26' 15.8911"N, Kelly Bushing: 65.68ft above Mean Sea Level OR~L~N= ,,se~l~v~c:as 149o32'19.0680"W) Survey Ref: svy8995 Sperry-Sun Drilling Services Survey Report for MPH-O8APB1 Your Ref: AP1-$00292280870 Surveyed: 7 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 8571.70 44.870 117.240 3821.87 3887.55 8588.00 44.780 117.520 3833.43 3899.11 8620.07 45.220 117.840 3856.11 3921.79 8652.75 45.750 118.170 3879.02 3944.70 8684.31 45.790 118.810 3901.04 3966.72 8713.48 45.960 120.480 3921.34 3987.02 8743.93 47.640 124.740 3942.19 4007.87 8774.05 51.060 129.080 3961.82 4027,50 8805.33 52.570 133.030 3981.16 4046,84 8834.90 55.460 133.060 3998.53 4064,21 8862.68 58.720 135.740 4013.62 4079.30 8897.73 61.880 137.510 4030.99 4096.67 8926.87 65.210 138.970 4043.97 4109.65 8958.68 68.820 140.900 4056.39 4122.07 8989.61 72.270 142.770 4066,69 4132.37 9019.56 76.460 144.950 4074.76 4140.44 9052.21 81.220 147.190 4081.08 4146.76 9082.98 85.900 149.240 4084.53 4150.21 9116.92 89.230 150.640 4085.97 4151.65 9148.03 88.210 149,940 4086.67 4152.35 9174.38 87.100 149.470 4087.75 4153.43 9209.91 86.220 148.810 4089.82 4155.50 9238.49 86.920 149.870 4091.53 4157.21 9266.96 88.270 151.680 4092.72 4158.40 9300.71 88,680 150.390 4093.62 4159.30 3369.20 S' 5743.67 3374.48 S 5753.87 3385.02 S 5773.95 3395.96S 5794.53 3406.75 S 5814.40 3417.10 S 5832.60 3429.07 S 5851.28 3442.80 S 5869.53 3458.95 S 5888.06 3475.28 S 5905.54 3491.60 S 5922.19 3513.73 S 5943.09 3533.19 S 5960.46 3555.60 S 5979.30 3578.53 S 5997.32 3601.82 S 6014.32 3628.39 S 6032.19 3654.38 S 6048.28 3683.72 $ 6065.27 3710.73 S 6080.68 3733.475 6093.96 3763.91S 6112.15 3788.45 S 6126.70 3813.28 S 6140.59 3842.79 S 6156.93 Global Coordinates Dogleg Northings Eastings Rate (ft) (tt) (°/lOOtt) E 6006593.27 N 562353.48 E E 6006588.06 N 562363.72 E E 6006577.68 N 562383.88 E E 6006566.89 N 562404.54 E E 6006556.26 N 562424.50 E E 6006546.04 N 562442.77E E 6006534.22 N 562461.54 E E 6006520.62 N 562479.89 E E 6006504.61N 562498.54 E E 6006488.42 N 562516.15 E E 6006472.22 N 562532.93 E E 6006450.25 N 562553.99 E E 6006430.92 N 562571.51 E E 6006408.66 N 562590.52 E E 6006385.87 N 562608.71 E E 6006362.71N 562625.88 E E 6006336.27 N 562643.95 E E 6006310.41N 562660.25 E E 6006281.20 N 562677.45 E E 6006254.30 N 562693.07 E E 6006231.67N 562706.52 E E 6006201.36 N 562724.95 E E 6006176.93 N 562739.68 E E 6006152.22 N 562753.76 E E 6006122.82 N 562770.32 E 1.331 1.543 1.774 1.459 4.151 11.593 15.758 11.036 9.774 14.257 10.026 12.276 12.648 12.526 15.647 16.057 16.587 10.642 3.976 4.574 3..094 4.439 7.927 4.009 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 6552.77 6563.95 6586.05 6608.79 6630.90 6651.45 6673.42 6696.21 6720,79 6744,69 6767.96 6798.23 6824.08 6852.98 6881.58 6909.65 6940.51 6969.65 7001.65 7030.94 7055.82 7089.46 7116.48 7143.18 7174.81 Tie-in Survey Window Point Continued... 25 January, 2000 - 8:28 - 2 - DrillQuest 1.05,04e Sperry-Sun Drilling Services Survey Report for MPH-O8APB1 Your Ref: AP1-$00292280870 Surveyed: 7 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 9332.45 89.200 150.910 4094.21 4159.89 9358.97 89.320 151.020 4094.55 4160.23 9397,75 88.680 151.060 4095.23 4160.91 9425.54 89.780 150.600 4095.60 4161.28 9460.60 90.150 149.790 4095.62 4161.30 9489.87 89.940 150.090 4095.60 4161.28 9524.27 89.630 149.640 4095.73 4161.41 9556.66 88.240 149.330 4096.33 4162.01 9583.36 87.840 148.860 4097.24 4162.92 ' 9615.70 87.350 149.140 4098.60 4164.28 9648.32 86.950 149.240 4100.22 4165.90 9676.26 87.500 149.200 4101.57 4167.25 9709.46 88.180 150.530 4102.82 4168.50 9740.42 87.840 149.750 4103.90 4169.58 9768.24 87.800 149.690 4104.96 4170.64 9801.53 88.030 149.980 4106.17 4171.85 9832.73 88.270 149.310 4107.18 4172.86 9860.14 89.030 148.810 4107.82 4173.50 9893.63 88.920 149.960 4108.42 4174.10 9924.93 89.470 148.110 4108.86 4174.54 9951.85 89.660 146.520 4109.07 4174.75 9985.72 89.410 146.270 4109.34 4175.02 10017.50 89.480 145.560 4109.65 4175,33 10044.70 89.380 145.830 4109.92 4175.60 10078.90 89.540 145.060 4110.24 4175.92 Local CoOrdinates Northings Eastings (ft) (tt) 3870.45 S 6172.48 E 3893.64 S 6185.35 E 3927.56 S 6204.13 E 3951.83 S 6217.67 E 3982.25 S 6235.10 E 4007.58 S 6249.76 E 4037.33 S 6267.03 E 4065.23 S 6283.47E 4088.13 S 6297.18 E 4115.82 S 6313.82 E 4143.80 S 6330.50 E 4167.78 S 6344.79 E 4196.47S 6361.44E 4223.31S 6376.85 E 4247.31S 6390.86 E 4276.08 S 6407.58 E 4302.98 S 6423.34 E 4326.49 S 6437.43 E 4355.30 S 6454.48 E 4382.14 S 6470.58 E 4404.80 S 6485.12 E 4433.00 S 6503.86 E 4459.32 S 6521.67 E 4481.79 S 6537.00 E 4509.96 $ 6556.40 E Global Coordinates Northings Eastings (ft) (ft) 6006095.28 N 562786.08 E 6006072.19 N 562799.13 E 6006038.41 N 562818.16 E 6006014.25 N 562831.89 E 6005983.96 N 562849.54 E 6005958.74 N 562864.40 E 6005929.12 N 562881.89 E 6005901.35 N 562898.54 E 6005878.56 N 562912.42 E 6005850.99 N 562929.27 E 6005823.14 N 562946.17 E 6005799.27 N 562960.64 E 6005770.71N 562977.51 E 6005743.99 N 562993.12 E 6005720.09 N 563007.32 E 6005691.45 N 563024.25 E 6005664.67 N 563040.21 E 6005641.27 N 563054.48 E 6005612.58 N 563071.75 E 6005585.87 N 563088.06 E 6005563.33 N 563102.76 E 6005535.26 N 563121,72 E 6005509.08 N 563139.73 E 6005486.73 N 563155.23 E 6005458.71N 563174.84 E Dogleg Rate (°/100fi) 2.317 0.614 1.654 4.290 2.540 1.251 1.588 4.397 2.311 1.745 1.264 1.974 4.497 2.747 0.259 1.111 2.280 3.319 3.449 6.166 5.948 1.044 2.245 1.058 2.299 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 7204.63 7229.49 7265.83 7291.91 7324.95 7352.58 7385.06 7415.70 7441.02 7471.68 7502.57 7529.02 7560.35 7589.51 7615.79 7647.21 7676.69 7702.69 7734.40 7764.09 7789.88 7822.47 7853.13 7879.40 7912.46 Continued... 25 January, 2000 - 8:28 - 3 - DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for MPH-O8APB1 Your Ref: API-500292280870 Surveyed: 7 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 10112.50 88.610 145,010 4110.78 4176.46 10137.20 88.240 144.320 4111.46 4177.14 10169.90 89.040 146,000 4112.24 4177.92 10201.80 89.630 146.610 4112.61 4178.29 10229.30 87.780 146.810 4113.23 4178.91 10260.50 86.920 148.150 4114.67 4180.35 10292.60 86.550 148.080 4116.50 4182.18 10319.90 86.760 148,350 4118.09 4183.77 10356.50 87.010 148.640 4120.08 4185.76 10387.70 86.490 148,530 4121.85 4187.53 10419.60 87,690 149.740 4123.47 4189.15 10452.60 91,230 150.570 4123.78 4189.46 10481.90 92,280 150.570 4122.89 4188.57 10516.30 91,630 151.140 4121.71 4187.39 10551.70 92.280 151.870 4120.50 4186.18 10584.10 93.360 152,270 4118,91 4184.59 10613.10 93.170 151.680 4117,26 4182.94 10649.00 91.570 150,390 4115.77 4181.45 10681.10 90.650 150.090 4115,15 4180.83 10710.40 90,490 150,540 4114.86 4180.54 10745.80 90.860 150.000 4114.44 4180.12 10778.20 91.230 150.040 4113.85 4179.53 10807.50 91.140 150.050 4113.25 4178.93 10841.40 90.920 149.300 4112.64 4178.32 10874.50 91.200 149.440 4112.02 4177.70 Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) 4537.49 S 6575.65 E 6005431,33 N 563194.30 E 4557.63 S 6589.93 E 6005411,29 N 563208.73 E 4584.46 $ 6608.61E 6005384.61N 563227,61E 4611.00 S 6626.30 E 6005358.20 N 563245.51E 4633.98 S 6641.39 E 6005335.34 N 563260.77 E 4660.26 S 6658.15 E 6005309.19 N 563277.73 E 4687.47S ' 6675.07 E 6005282.10 N 563294.86 E 4710.64 S 6689.43 E 6005259.05 N 563309.39 E 4741.79 S 6708.53 E 6005228.03 N 563328.72 E 4768.38 S 6724.76 E 6005201.57 N 563345.16 E 4795.72 S 6741.11 E 6005174.35 N 563361.71 E 4824.34 $ 6757.53 E 6005145.86 N 563378.35 E 4849.85 S 6771.92 E 6005120.46 N 563392.93 E 4879.87 S 6788.66 E 6005090.57 N 563409.90 E 4910.97 S 6805.54 E 6005059.60 N 563427.02 E 4939.56 S 6820.70 E 6005031.13 N 563442.39 E 4965.12 S 6834.30 E 6005005.67 N 563456.19 E 4996.50 $ 6851.67 E 6004974.42 N 563473.79 E 5024.36 S 6867.60 E 6004946.68 N 563489.94 E 5049.81S 6882.11E 6004921.34 N 563504.64 E 5080.55 S 6899.66 E 6004890.74 N 563522.42 E 5108.61S 6915.85 E 6004862.80 N 563538.82 E 5133.99 S 6930.48 E 6004837.53 N 563553.64E 5163.25 S 6947.59 E 6004808.41N 563570.98 E 5191.72 S 6964.45 E 6004780.06 N 563588.05 E Dogleg Rate (°/100ft) 2.772 3.169 5.689 2.660 6.766 5.099 1.173 1.252 1.045 1.703 5.339 11.018 3.584 2.513 2.760 3.554 2.134 5.723 3.015 1.630 1.849 1.149 0.309 2.305 0.946 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 7945.00 7968.95 8000.60 8031.31 8o57.73 8087.56 8118,13 8144.11 8178,89 8208.53 8238.74 8269.84 8297.37 8329.63 8362.69 8392.81 8419.78 8453.40 8483.64 8511.22 8544.56 8575.12 86O2.75 8634.79 8666.13 Continued... 25 January, 2000 - 8:28 - 4 - DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for MPH-O8APB1 Your Ref: API-500292280870 Surveyed: 7 January, 2000 North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Dogleg Northings Eastings Rate (fi) (fi) (°/100fi) 10905.30 91.970 149.820 4111.17 4176.85 ~. 5218.29 S 6980.02 E 10940.60 93.870 149.520 4109.37 4175.05 5248.71 $ 6997.82 E 10973.40 94.390 150.040 4107.01 4172.69 5276.98 $ 7014.29 E 10998.80 95.060 150.170 4104.92 4170.60 5298.93 S 7026.90 E 11090.00 95.060 150.170 4096.88 4162.56 5377.74 S 7072.09 E 6004753.61N 563603.82 E 6004723.32 N 563621.85 E 6004695.18 N 563638.53 E 6004673.33 N 563651.32 E 6004594.87 N 563697.10 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.818° (27-Dec-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 130.640° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11090.00ft., The Bottom Hole Displacement is 8884.51ft., in the Direction of 127.250° (True). 2.788 5.449 2.239 2.687 0.000 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 8695.25 8728.57 8759.48 8783.35 8868.96 Projected Survey Continued... 25 January, 2000 - 8:28 - 5 - DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for MPH-O8APB1 Your Ref: AP1-$00292280870 Surveyed: 7 January, 2000 North Slope Alaska Alaska State Plane 4 Milne Point MPH Comments Measured Depth (ft) 8571.70 8588.00 11090.00 Station Coordinates TVD Nothings Eastings (~) (~) (~) 3887.55 3369.20 S 5743.67 E 3899.11 3374.48 S 5753.87 E 4162.56 5377.74 S 7072.09 E Comment Tie-in Survey Window Point Projected Survey 25 January, 2000 - 8:29 - 6 - DrillQuest 1.05.04e North Slope Alaska Alaska State Plane 4 Milne Point MPH MPH-O8A Surveyed: 12 January, 2000 SURVEY REPORT ORIGINAL 25 January, 2000 Your Ref: API-500292280801 Surface Coordinates: 6009918.79 N, 556584.41 E (70° 26' 15.8911" N, 149° 32' 19.0680" W) Kelly Bushing: 65.68ft above Mean Sea Level OIRI L'LI N I$i ~iel~VlCeS Survey Reft svy8997 Sperry-Sun Drilling Services Survey Report for MPH-O8A Your Ref: API-500292280801 Surveyed: 12 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Vertical Depth Depth eft) (ft) 9019.56 76.460 144,950 4074.76 4140.44 9030.00 77.980 145.670 4077.07 4142.75 9070.92 74.210 143,660 4086.90 4152.58 9102.00 75.680 141.800 4094.98 4160.66 9133.17 77.460 139.980 4102.22 4167.90 9158.21 78.340 140.870 4107.47 4173.15 9194.80 78.780 139.100 4114.72 4180.40 9224.76 81.970 139.060 4119.73 4185.41 9244.96 85.130 140.630 4122.00 4187.68 9274.57 88.950 141.570 4123.53 4189.21 9317.98 94.070 143.990 4122.39 4188.07 9338.22 94,990 143.880 4120.79 4186.47 9368.11 93.450 141.950 4118.59 4184.27 9397.95 90.430 141.830 4117.58 4183.26 9429.55 90.490 142.310 4117.33 4183.01 9464.90 86.340 145.830 4117.69 4183.37 9496.27 89.080 146.710 4118.39 4184.07 9522.46 90,920 147.300 4118,39 4184.07 9555.75 91,230 147.260 4117,77 4183.45 9586.37 91.540 147.180 4117.03 4182.71 9615.38 91.660 146.410 4116.22 4181.90 9648.43 91.720 146.360 4115.24 4180.92 9679.64 91.720 146.460 4114.31 4179.99 9707.90 91.720 146.230 4113.46 4179,14 9740.19 91.910 146.170 4112.44 4178,12 Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) 3601.82 S 6014.32 E 6006362.71N 562625.88 E 3610.19 S 6020.11 E 6006354.38 N 562631.74 E 3642.59 $ 6043.07 E 6006322.16 N 562654.95 E 3666.47 S 6061.25 E 6006298.41N 562673,30 E 3689.99 $ 6080.37 E 6006275.04 N 562692.61 E 3708.87 S 6095.97 E 6006256.28 N 562708,35 E 3736.33 S 6119.03 E 6006228.99 N 562731.61 E 3758.65 S 6138.37 E 6006206.83 N 562751.13 E 3773.99 S 6151.32 E 6006191,58 N 562764.18 E 3797.00 S 6169.88 E 6006168,72 N 562782.92 E 3831.54 S 6196.12 E 6006134,38 N 562809.42 E 3847.85 $ 6208.00 E 6006118.16 N 562821.42 E 3871.63 S 6225.97 E 6006094.52 N 562839.58 E 3895.09 S 6244.38 E 6006071.19 N 562858.16 E 3920.01S 6263.80 E 6006046.42 N 562877.77 E 3948.63 S 6284.54 E 6006017.96 N 562898.73 E 3974.71S 6301.95 E 6005992.01N 562916,34 E 3996.68 $ 6316.21 E 6005970.15 N 562930.77 E 4024.68 $ 6334.20 E 6005942.29 N 562948.97 E 4050.41 $ 6350.78 E 6005916.68 N 562965.74 E 4074.68 S 6366.66 E 6005892.54 N 562981.80 E 4102.19 S 6384.95 E 6005865.16 N 563000.30 E 4128.18 S 6402.21 E 6005839.31N 563017.75 E 4151.69 S 6417.86 E 6005815.92 N 563033.59 E 4178.51 $ 6435.81 E 6005789.23 N 563051.74 E Dogleg Rate (°/100fi) 16.o38 10.373 7.468 8.054 4.943 4,891 10.648 17.446 13.285 13.044 4.578 8,247 10.129 1.531 11.667 3.665 7.378 0.939 1.046 2.685 0.236 0.320 o.814 0.617 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 6909.65 6919.49 6958.02 6987.37 7017.20 7041.32 7076.71 7105.92 7125.74 7154.81 7197.22 7216.85 7245.98 7275.22 7306.20 7340.57 7370.77 7395.90 7427.79 7457.13 7484.98 7516.78 7546.80 7573.99 7605.08 Tie-in Survey Window Point Continued... 25 January, 2000 - 9:44 Q3AI333a -2- DrillQuest 1,05.04e Sperry-Sun Drilling Services Survey Report for MPH-O8A Your Ref: API-500292280801 Surveyed: 12 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 9772.04 91.910 145.630 4111.37 4177.05 9800.42 90.310 145,980 4110.82 4176.50 9831.91 90,490 145.870 4110.60 4176.28 9863.18 90,490 14~750 4110.34 4176.02 9892.47 89.380 146.680 4110.37 4176,05 9924.95 89.940 146.530 4110.56 4176.24 9956.41 89.630 145.950 4110.68 4176.36 9984.03 88.950 144.800 4111.02 4176,70 10018.80 89.080 145.890 4111.62 4177.30 10050.00 91.720 147,530 4111.40 4177.08 10076.70 92.520 149.000 4110.42 4176.10 10111.30 91.660 147.980 4109.15 4174.83 10142.90 93.820 150.090 4107.64 4173.32 10169.60 94.740 150,330 4105.65 4171.33 10203.30 94.620 149.390 4102.90 4168.58 10234.60 92.090 148.200 4101.07 4166.75 10262.20 92.220 148.250 4100.03 4165.71 10294.20 92,280 148,300 4098.77 4164.45 10326.30 91.980 149.290 4097.58 4163.26 10355.50 91.720 147,980 4096.64 4162.32 10391.60 89.750 145,930 4096.18 4161.86 10424.80 85,130 144,900 4097.66 4163.34 10451.70 84,820 145,170 4100.01 4165.69 10479.60 85,060 144.830 4102.48 4168.16 10496.90 85,440 145.230 4103.91 4169.59 Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 4204.87 S 6453.66 E 4228.34 S 6469.61E 4254.42 S 6487.25 E 4280.28 S 6504.82 E 4304.63 S 6521.11E 4331.74 S 6538.98 E 4357.90 S 6556.47 E 4380,62 S 6572.16 E 4409.22 S 6591.93 E 4435.30 S 6609.05 E 4457.99 $ 6623.08 E 4487.47 S 6641.15 E 4514.53 $ 6657.39 E 4537.64 S 6670.62 E 4566.68 S 6687.49 E 4593.40 S 6703.67E 4616.85 $ 6718.20 E 4644.05 S 6735.01 E 4671.49 $ 6751.63 E 4696.40 S 6766.82 E 4726.66 S 6786.50 E 4753.96 $ 6805.32 E 4775.92 $ 6820.68 E 4798.68 S 6836.62 E 4812.81S 6846.50 E 6005763.01 N 563069.79 E 6005739.66 N 563085.91 E 6005713.72 N 563103.75 E 6005687.99 N 563121.52 E 6005663.77 N 563137.99 E 6005636.79 N 563156.07 E 6005610.77 N 563173.75 E 6005588.16 N 563189.62 E 6005559.71N 563209.60 E 6005533.77 N 563226.92 E 6005511.18 N 563241.13 E 6005481.84 N 563259.42 E 6005454.90 N 563275.87 E 6005431.90 N 563289.27 E 6005402.98 N 563306.35 E 6005376.38 N 563322.74 E 6005353.05 N 563337.44E 6005325.98 N 563354.46 E 6005298.67 N 563371.29 E 6005273.86 N 563386.67 E 6005243.76 N 563406.58 E 6005216.61N 563425.61E 6005194.76 N 563441.13 E 6005172.12 N 563457.24 E 6005158.07 N 563467.23 E 1.695 5,771 0,670 0,384 4,944 1.785 2.090 4.837 3.157 9.961 6.265 3.854 9.550 3.560 2.803 8.930 0.505 0.244 3.221 4.572 7.875 14.256 1.526 1.488 3.183 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) 'Comment 7635.79 7663.18 7693.55 7723.73 7751.95 7783.17 7813.47 784o.18 7873.81 7903.79 7929.21 7962.13 7992.07 8o17,16 8048.88 8078.56 8104.86 8135.33 8165.81 8193.56 8228.20 8260.27 8286.22 8313.14 8329.84 Continued... 25 January, 2000 - 9:44 -3- Q3^I303 J DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for MPH-O8A Your Ref: AP1-$00292280801 Surveyed: 12 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 10531,50 85.940 147.340 4106.51 4172.19 10562.10 87.410 149.450 4108.28 4173,96 10589.30 88.280 148.390 4109.31 4174.99 10623.10 88.280 147.600 4110.32 4176.00 10654.20 88.460 147.330 4111.21 4176.89 10681.20 88.580 147.260 4111.90 4177.58 10715.40 88.650 148.110 4112.73 4178.41 10746.80 88.650 151.180 4113.47 4179.15 10774.40 88.830 151.140 4114.08 4179.76 10808.60 88.890 151.130 4114.76 4180.44 10839.40 87.170 152.220 4115.82 4181.50 10866.70 86.250 152.740 4117.38 4183.06 10900.30 86.310 153.760 4119.56 4185.24 10931.60 85.870 153.610 4121.70 4187.38 10958.20 85.940 154.630 4123.60 4189.28 10992.70 89.200 153.950 4125.06 4190.74 11024.90 89.630 153.750 4125.39 4191.07 11051.40 89.750 153.860 4125.53 4191.21 11085.40 91.480 153.380 4125.17 4190.85 11116.80 91.350 152.830 4124.39 4190.07 11143.90 91,420 153.180 4123.74 4189.42 11178.20 91.480 152.650 4122.87 4188.55 11210.00 90.620 152.540 4122.28 4187.96 11236.10 90.490 152.890 4122.03 4187.71 11271.20 90.920 152.980 4121.60 4187.28 Local Coordinates Northings Eastings (ft) (ft) 4841.51S 6865.65 E 4867.52 S 6881.66 E 4890.80 S 6895.69 E 4919.45 S 6913.60 E 4945.66 S 6930.31E 4968.37 S 6944.90 E 4997.27 S 6963.17 E 5024.35 S 6979.04 E 5048.52 S 6992.35 E 5078.47 S 7008.85 E 5105.56 $ 7023.46 E 5129.73 $ 7036.05 E 5159.67 S 7051.14 E 5187.66 S 7064.99 E 5211.53 $ 7076.57 E 5242.59 S 7091.52 E 5271.49 $ 7105.71 E 5295.27 S 7117.41E 5325.72 S 7132.51E 5353.72 S 7146.71E 5377,86 S 7159.01 E 5408.39 S 7174.62 E 5436.61 $ 7189.25 E 5459.81S 7201.22 E 5491.06 S 7217.19 E Global Coordinates Northings Eastings (ft) (ft) 6005129.51N 563486.60 E 6005103.62 N 563502.80 E 6005080.45 N 563517.01 E 6005051.94 N 563535.13 E 6005025.86 N 563552.05 E 6005003.26 N 563566.81E 6004974.50 N 563585.30 E 6004947.54 N ~563601.37 E 6004923.47 N 563614.86 E 6004893.65 N 563631.59 E 6004866,67 N 563646.40 E 6004842.59 N 563659.18 E 6004812.77 N 563674.50 E 6004784.88 N 563688.55 E 6004761.10 N 563700.32 E 6004730.16 N 563715.50 E 6004701.37 N 563729.91E 6004677.68 N 563741.79 E 6004647.34 N 563757.13 E 6004619.45 N 563771.54 E 6004595.41N 563784.02 E 6004565.00 N 563799.86 E 6004536.88 N 563814,71 E 6004513.78 N 563826.85 E 6004482.65 N 563643.05 E Dogleg Rate (°/100ft) 6.250 8.394 5.039 2,336 1.043 0.514 2.493 9.774 0.668 0.178 6.610 3.869 3.035 1.485 3.834 9.652 1.473 0.614 5.280 1.799 1.317 1.555 2.726 1.430 1.252 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 8363.07 8392.16 8417.96 8450.21 8479.97 8505.83 8538.51 8568.19 8594.03 8626.06 8654.79 8680.09 8711.04 8739.78 8764.11 8795.68 8825.27 8849.64 8880.94 8909.94 8935.o0 8966.73 8996.22 9020.40 9052.88 Continued... 25 January, 2000 - 9:44 -4- DrillQuest 1.05,04e Sperry-Sun Drilling Services Survey Report for MPH-O8A Your Ref: API-500292280801 Surveyed: 12 January, 2000 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 11300.20 91.290 152.940 4121.04 4186,72 11327.80 88.710 153.380 4121.04 4186.72 11363.80 86.740 151.960 4122.47 4188.15 11394.90 85.250 151.410 4124.64 4190.32 11420.80 84.140 151.240 4127.04 4192.72 11457.70 84.020 151.360 4130.84 41'96.52 11488.60 84.390 151.020 4133.96 4199.64 1 1517.80 84.820 150.960 4136.71 4202.39 11554.20 85.440 150.840 4139.80 4205.48 11586.90 85.690 150.660 4142.33 4208.01 1 1615.10 86.490 150.550 4144.25 4209.93 11652.30 86.920 150.200 4146.39 4212.07 11683.40 87.230 150.300 4147.97 4213.65 11713.00 87.290 149.960 4149.39 4215.07 1 1748.90 86.550 150.730 4151.32 4217.00 11782.80 86.800 150.710 4153.28 4218.96 11809.40 86.490 149.850 4154.84 4220.52 11841.20 86.740 151.040 4156.72 4222.40 11876.50 88.280 152.360 4158.25 4223.93 11904.00 90.120 152.060 4158.64 4224.32 11939.80 90.000 151.420 4158.60 4224.28 11972.60 89.940 151.440 4158.62 4224.30 12000.50 90.000 151.650 41 58.63 4224.31 12037.30 89.080 151.250 41 58.93 4224.61 12098.30 84.010 152.390 4162.60 4228.28 5516.89 S 7230.37 5541.51 S 7242.83 5573.47 S 7259.34 5600.78 S 7274.06 5623.40 S 7286.43 5655.60 S 7304.06 5682.53 $ 7318.87 5707.96 $ 7332.97 5739.65 S 7350.61 5768.09 S 7366.54 5792.61 $ 7380.35 5824.89 S 7398.71 5851.85 S 7414.12 5877.49 S 7428.84 5908.65 S 7446.58 5938.16 S 7463.13 5961.23 S 7476.30 5988.84 S 7491.96 6019.89 $ 7508.67 6044.21 S 7521.49 6075.75 S 7538.44 6104.55 S 7554.13 6129.08 S 7567.42 6161.41 S 7585.01 6215.06 S 7613.76 E 6004456.92 N 563856.43 E E 6004432.39 N 563869.08 E E 6004400.56 N 563885.83 E E 6004373.37 N 563900.75 E E 6004350.83 N 563913.30 E E 6004318.78 N 563931.17 E E 6004291.95 N 563946.19 E E 6004266.64 N 563960.48 E E 6004235.08 N 563978.36 E E 6004206.76 N 563994.50 E E 6004182.35 N 564008.50 E E 6004150.21 N 564027.10 E E 6004123.36 N 564042.72 E E 6004097.83 N 564057.64 E E 6004066.82 N 564075.61 E E 6004037.42 N 564092.38 E E 6004014.46 N 564105.72 E E 6003986.97 N 564121.59 E E 6003956.05 N 564138.54 E E 6003931.82 N 564151.55 E E 6003900.42N 564168.74 E E 6003871.73 N 564184.64 E E 6003847.30 N 564198.12 E E 6003815.11 N 564215.95 E E 6003761.68 N 564245.10 E Dogleg Rate (o/~ooft) 1.283 9.483 6.744 5.105 4.335 0.459 1.622 1.487 1.735 0.941 2.863 1.489 1.047 1.165 2.973 0.740 3.431 3.817 5.744 6.779 1,819 0,193 0.783 2.726 8.518 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 9079.70 9105.19 9138.53 9167.49 9191.61 9225.96 9254.74 9282.00 9316.02 9346.64 9373.08 9408.04 9437.30 9465.17 9498.92 9530.70 9555.71 9585.58 9618.49 9644.06 9677.46 9708.12 9734.18 9768.58 9825.34 25 January, 2000 - 9:44 -5- Continued... DrillQuest 1.05.04e Sperry-Sun Drilling Services Survey Report for MPH-O8A Your Ref: AP1-$00292280801 Surveyed: 12 January, 2000 North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 12164.o0 84.01o 152.390 4169.46 4235.14 6272.96 S 7644.04 E 6003704.01N 564275.82 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.818° (27-Dec-99) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 130.640° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12164.00ft., The Bottom Hole Displacement is 9888.44ft., in the Direction of 129.373° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (fi) (ft) (ft) (ft) 9019.56 4140.44 3601.82 S 6014.32 E Tie-in Survey 9030.00 4142.75 3610.19 S 6020.11 E Window Point 12164.00 4235.14 6272.96 S 7644.04 E Projected Survey Dogleg Rate (°ll00ft) 0.000 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) Comment 9886.03 Projected Survey 25 January, 2000- 9:44 DrillQuest 1.05.04e ,ri DIRILLI N I~ I=; I:= F:R ~/I I-- 1=: ~ WELI~ LOG TRANSMITTAL RE: MWD Formation Evaluation Logs MPH-08A & MPH-08A PB 1, AK-MM-90216 To: State of Alaska February 17, 2000 Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 2 LDWG formatted Disks with verification listings. API#: 50-029-22808-0! & 50-029-20808-70 PLEASE ACKNOWLEDGE RECEIFr BY SIGNLNG .Z~ND RE33JRNING THE A~FACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Yum Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 RECE!¥ED FEB Date: Alaska Oil & Gas Cons. Commissio~ Anchorage BP Exploration (Alaska) Inc. Petro-teehnieal Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535 A Halliburton Company RE: MPH-08A ~ ~ .~ '--'~, Subject: RE: MPH-08A Date: Fri, 14 Jan 2000 17:57:54 -0500 From: "Mallary, Chuck (ARCO)" <MallarCR~BP.com> To: "'blair_wondzell@admin. state.ak.us'" <blair_wondzell@admin. state.ak.us> CC: "'tom_maunder~admin. state.ak.us'" <tom_maunder@admin. state.ak.us> Mr. Wondzell, Our completion plan for the subject well, H-08A, has changed from what I stated on 7 January. We now plan to position the payzone packer (ECP) above the open hole junction between the aborted first lateral and the recently TD'd second lateral. This will effectively turn the well into a multilateral in the Schrader Bluff 'OA' sands. Our hope is that both laterals will contribute to the well's production. The well will be completed with a jet pump as per our original permit application I will fax you a hand sketch illustrating these plans. regards, Chuck Mallary Sr. Drilling Engineer, WNS/ENS Shared Services Drilling (907)564-5061 > > From: > Sent: > To: > Cc: > Triolo, Mike T > Subject: MPH-O8A > Importance: High > Mr. Wondzell, Mallary, Chuck (ARCO) Friday, January 07, 2000 11: 05 AM Johnson, Frederick C (ARCO); Vandergon, Mark A; Jenkins, David P; ~o~1~.~{~~Ft The purpose of this email is to update you on progress on well MPH-O8A (API# 50-029-22808-01; Permit # 199-22) and to obtain your approval for our forward plans. Progress to Date: We have drilled the 6" lateral to a measured depth of ll,091-ft. There have been no drilling problems, but geologic steering has been difficult in the Schrader Bluff "OA" sands. We believe the hole drilled thus far will access only a fraction of the reserves targeted, and we are pessimistic that geosteering efficiency will improve in the remaining 1600-ft of hole. For this reason we plan a geologic sidetrack of the well. Sidetrack and Abandonment Plan: We plan to low-side sidetrack the well in open hole. The sidetrack point will be below the 7" whipstock and above the "OA" sand penetration depth. This will be accomplished by "trenching" and time drilling. The original sidetrack will be left open as we essentially twin the originally hole lO-12-ft TVD deeper. After reaching TD, we will run and cement a 4-1/2" liner into the new hole. This liner will be equipped with a payzone packer (External Casing Packer) on the bottom and a liner top packer at the top. These two packers and the cement will effectively isolate the first sidetrack from the new wellbore. We currently plan to leave the hole below the liner barefoot. The well will be completed with a jet pump as per our original permit application. .... 1/18/00 9:02 AM ?90 ~,~ t! AP£ # 4"0 -ozcT- 2z~o2'-o/ ..... 878o'- ~ooo' ~ b 7-0 NE~ ~ OETIZ-AC/<. / 5z ..T4M Z ooo Subject: Re: MPH-08A _ ~.,. . Date: Fri, 07 Jan 2000 14:27:22 -0900 From: Blair Wondzcll <blair_wondzell@admin. state.ak.us> Organization: State of Alaska, Dept of Admin, Oil & Gas To: "Mallary, Chuck (ARCO)" <MallarCR@BP.com> CC: "Johnson, Frederick C (ARCO)" <JohnsoFC~BP.com>, "Vandergon, Mark A" <vanderma~BP.com>, "Jenkins, David P" <JenkinDP~BP.com>, "Triolo, Mike T" <TrioloMT@BP.com> Chuck, Thanks for the information provided in our phone converation, this e-mail as well as the faxed sketch. Tom Maunder, Bob Crandall and I looked at all the information you provided. We understand that the logs showed the redrill was in the top of the sand - sometimes in and sometimes out - and that it cut at least three faults. Based on this infromation your geolgists concluded that the current redrill should be abandoned and a new horizontal wellbore segmaent drilled lower in the sand. You proposed drilling a new horizontal wellbore in the same sand going to the same bottomhole location as the one permitted, but approximately 12 feet lower - the two could be in communication within the sand. You proposed that a solid liner with ECP will be cemented from within the top of the new wellbore segment into the original casing, approximately 150 feet above the top of the window. Because of the mechanical problems you encountered in controlling the well path and because the bottom hole location is not changing - you are only cutting a new wellbore withing the permited sand at the permitted location, we concluded that a new PTD is not necessary, neither is a 10-403. It comes under 20 AAC 25,005(e) straightening the wellbore. Therefore this e-mail correspondance will be sufficient. Sincerely, Blair Wondzell 7jan00. "Mallary, Chuck (ARCO)" wrote: > Mr. Wondzell, > The purpose of this email is to update you on progress on well MPH-O8A (API > # 50-029-22808-01; Permit # ~ and to obtain your approval for our > forward plans. > Progress to Date: > We have drilled the 6" lateral to a measured depth of ll,091-ft. There have > been no drilling problems, but geologic steering has been difficult in the > Schrader Bluff "OA" sands. We believe the hole drilled thus far will access > only a fraction of the reserves targeted, and we are pessimistic that > geosteering efficiency will improve in the remaining 1600-ft of hole. For > this reason we plan a geologic sidetrack of the well. > > Sidetrack and Abandonment Plan: > We plan to low-side sidetrack the well in open hole. The sidetrack point > will be below the 7" whipstock and above the "OA" sand penetration depth. > This will be accomplished by "trenching" and time drilling. The original > sidetrack will be left open as we essentially twin the originally hole > lO-12-ft TVD deeper. After reaching TD, we will run and cement a 4-1/2" > liner into the new hole. This liner will be equipped with a payzone packer > (External Casing Packer) on the bottom and a liner top packer at the top. > These two packers and the cement will effectively isolate the first > sidetrack from the new wellbore. We currently plan to leave the hole below > the liner barefoot. The well will be completed with a jet pump as per our /7/00 2:28 PM original permit application. I am faxing you a hand sketch which should illuminate these plans, and will call you to discuss. regards, Chuck Mallary Sr. Drilling Engineer, WNS/ENS Shared Services Drilling (907) 564-5061 1/7/00 2:28 PM TONY KNOWLES, GOVERNOR ALASiIA OIL AND GAS CONSERYA~ION COPL~ISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Charles Mallary Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit MPH-08A BP Exploration (Alaska), Inc. Permit No: 199-122 Sur Loc: 2767'NSL, 4061'WEL, SEC. 34, T13N, R10E, UM Btmhole Loc. 4056'SNL, 3878'EWL, SEC. 01, T12N, R10E, UM Dear Mr. Mallar).:: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Robert N. Christenson, P. E. Chairman BY ORDER OF THE~OMMISSION DATED this {~'=~ day of December, 1999 dlffEnclosurcs Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o cncl. STATE OF ALASKA .... ALAS[,. :,~OIL AND GAS CONSERVATION C~. ?IISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb' Type of well [] Re-Entry [] Deepen I [] Exploratory [] Stratigraphic Test [] Development Oil 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface V'f ,./" ,/ 2767' NSL, 4061' WEL, SEC. 34, T13N, R10E, UM At top of productive interval 1120' SNL, 2014' EWL, SEC. 01, T12N, R10E, UM At total depth 4056' SNL, 3878' EWL, SEC. 01, T12N, R10E, UM 2. Distance to nearest property line 113. Distance to nearest well ADL 380110, 1401' MDI No Close. Approach 16. To be completed for deviated wells Kick Off De 8597' MD Maximum Hole Angle 18. Casing Program Specifications Size Casing Grade Coupling 4-1/2" L-80 IBT-M [] Service [] Development Gas [] Single Zone 90° i5. Datum Elevation (DF or KB) Plan KBE = 66' 6. Property Designation ADL 380109 7. Unit or Property Name Milne Point Unit 8. Well Number MPH-O8A 9. Approximate spud date 12/22/99 [] Multiple Zone 10. Field and Pool Milne Point Unit / Schrader Bluff" 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 Amount $200,000.00 !14. Number of acres in property 15. Proposed depth (MD and TVD) 12746' MD / 4156' TVD 2560 L 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Maximum surface 1315 psig, At total depth (TVD) 4000' / 1775 psig Setting Depth To Bottom Quantity of Cement (include stage data) sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured ,,9275 feet true vertical ¥4392 feet Effective depth: measured 9167 feet true vertical 4314 feet Casing. Length Size Structural Conductor Surface Intermediate Production Liner 110' 20" Plugs (measured) Junk (measured) 9222' 7" ORIGINAL Cemented MD TVD 250 sx Arcticset I (Approx.) 110' 110' Perforation depth: measured 8940'- 8960', 9014' - 9034' true vertical 4150' - 4164', 4203' - 4218' 2047 sx PF 'E', 263 sx 'G', 191 sx PF 'C' 9253' 4376' RECEIVED DEC 1 b 1999 Nasl INI & Gas Cons. c0mm' ion 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Fred Johnson, 564-5427 Prepared By Name/Number: Terrie Hubble, 564-4628 21.1 hereby ce~if~~o~~ect to the best of my knowledge Signed~~~-'~-' Charles M~a. llary Title Senior Drilling Engineer ~/ Commission Use Only j J , ApprovaLDate~ Permit Number APl Number ,/' 50-029-22808-01 Conditions of Approval: Approved By Date /~//~ ~/'~ ~ I See cover letter for other requirements Samples Required [] Yes ~ No Mud Log Required [] Yes l~'No Hydrogen Sulfide Measures [-I Yes~u No Directional Survey Required [~Yes F'] No Required Working Pressure for BOPE "J~2K; []3K; []4K; [] 5K; [] 10K;' [] 15K Other: ORIGINAL SIGNED'BY by order of DateI''~'oL,-'' ~I]jI"~-C~I Robert N. Chfistenson Commissioner the commission Form 10-401 Rev. 12-01-85 .q,,hmit In TrinlidntP. I Well Name: IMP H-08A Well Plan Summary I Type of Well (producer or injector): I Producer I Surface Location: 2767' NSL, 4061' WEL, Sec. 34, T13N, R10E X = 556,584.41 Y = 6,009,918.79 Target Start: 1120' SNL, 2014' EWL, Sec. 1, T12N, R10E X = 562,691 Y = 6,006,080.00 Z = 4,080' TVDss Intermediate Target End: 4056' SNL, 3878' EWL, Sec. 1, T12N, R10E X = 564,581.00 Y = 6,003,160.00 Z = 4,090' TVDss I AFE Number: 1337172 I I Rig: J Nordic3 I Estimated Start Date: I Dec 22, 1999 J J Operatin~l days to complete: I 15.0 I MD 112,746' I ITvDrkb: 14,156' I IKBE: ] Well Design (conventional, slim hole,etc.): IExtended HOrizOntal sidetrack 1 66.00' Objective: Sidetrack out of existing 26#, 7" csg into the Ugnu Formation, directionally drill 6" hole, land horizontally in the Schrader Bluff 'OA' sands. Geosteer horizontally through the OA target sands to TD at 12,746' MD. Run, cmt and test a 4 1/2" Banzai (solid) liner at the top of the "OA" sand, complete with a 4-1/2" jet pump completion. Current Well Information Well Name: APl Number: Well Type: Current Status: Last H2S Sample: Cement: TD / PBTD: BHP: BHT: Is this well frac'd? Mechanical Condition: MP H-08 Wellhead: Nordic 3: Tubing: Liner: Casing: Casing Head: Casing Hanger: 7" Packoff: Tubing Spool: Tbg. Hanger: Tree: Open Perfs: 7" Casing Fluids: MPH-08 50-029-22808 Shrader Bluff Producer All,open perf's P & A'd '~ 0 ppm 7" casing cemented to surface. Estimated top of tail' cement 7500' t' 9,275' / 8,606' 1,800 psi Schader Bluff 'OA' sand. Estimated from shut-in pressure 80°F@ 4,020' ss Estimated Yes Cellar Box MSL = 36.00' KB / MSL = 66.00' No tubing in well at present. Completion tubing will be 3-1/2", 9.3#, L-80, EUE 8rd None Conductor: 110', 20", 92#, H-40 Welded Surface: None Production: 9253', 7", 26#, L-80, BTC None 7" FMC Mandrel None FMC Gen 6 11", 5M FMC 11" x 2-7/8" EUE top and btm. ESP and heat trace penetrator prep. with dummy mandrels installed 2-1/2", 'H' type BPV profile Cameron 5M, 2-9/16" None. Well Decompleted by Nabors 4ES SW with diesel cap down to -2000' No kill string installed Target Estimates: Estimated Reserves: Expected Initial Rate: Expected 6 month avg: Materials Needed: L-80 Intermediate: Expected reserves 1.3 mmbbl Production rate: 1,000 b/d Production rate: 1,000 b/d L-80 Production: L-80 Completion: 3500' contingency 1000' 7" x 4-1/2" 4-1/2" 50 - 4-5/8" x 5 3/4" x 8" 1 lot Bonzai liner equipment 8500' 4-1/2" CMU SSD 2x4-1/2"Landing nipples 7"x4-1/2" Packer 4-1/2" 4-1/8' 5M 4.5", 12.6#, L-80, IBT-Mod Slotted Liner ~,\~,,~'\ % 4.5", 12.6#, L-80, IBT-Mod Solid Liner ~c_c~~::,~ '~1~ Baker liner top hanger / packer Halliburton Guide Shoe Rigid Straight Blade Centralizers and stop rings 20' CTC ECP, HMCV, Indicator subs, packoff bushing, spacer subs 4-1/2', 12.6#, L-80, 8rd EUE tubing Baker sliding sleeve X and XN nipples Baker S3 FMC tubing hanger and adapter Gen 6 Cameron Tree riilin.q Hazards· .andContin: encies : . . . . Well Control a) At the end of the 4-1/2" Bonzai liner procedure the well will be displaced over to 8.8 lb/gal completion fluid. According to recent pressure data 8.8 lb/gal completion, fluid,s[~ould be .3 BP,g .~verbalance. During and after displacement monitor the well closely to!¢~hS;U~:~ t~hat there is';.~-:;:'-¢ Kick tolerance a) The kick tolerance for the 6" open hole section is infinite assuming an influx at the 12,746' TD in the Schrader OA formation. This is a worst case scenario based on a 8.8 ppg pore pressure gradient in the top of the production section and a minimum fracture gradient of 12.5 ppg at the base window in the 7" casing with a 9.1 ppg mud in the hole. b) H-08 ran a single string of 7" casing to TD and cemented the casing to surface. The top of the 13.1 lb/gal tail cement slurry is estimated to be 7500'. Lost Circulation a). Earlier wells H-03 and H-05 experienced some lost circulation above the Schrader Bluff. The other H pad wells did not experience lost circulation. b) Several minor faults are possible in the horizontal target interval. Maintain minimum ECD thru use of proper hole cleaning procedures and PWD monitoring. c) Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to Cementing. Unexpected ~High PreSsures a) It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. The original H-08 well had a reservoir pressure is 1,774 psi, 3,945'TVDss or 8.5 EMW. In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. Stuck Pipe a) During the drilling phase of MPJ-01A we did not experience any stickiness while building angle through the shaley clay !nterval of the Ugnu formation, however there were possible indications that we experienced differential sticking while drilling horizontally in the OA sand interval. b) c) Stuck Pipe: Go immediately to SURE manual, determine stuck pipe mechanism, follow recommendations in the SURE manual. DO NOT JAR UP if packed-off! There is a risk of differentially sticking the 4-1/2" liner. The 9.1 lb/gal mud will be 0.6 lb/gal overbalanced to the 8.5 lb/gal OA sand reservoir pressure (125 psi differential pressure @ 4,000' TVD). The liner should be kept moving as much as possible while running in the open hole. The 5-1/2" casing on the J-151 well was just recently differentially stuck. We previously encountered differentially sticking in the OA Sand interval while running in the hole with the 4-1/2" liner on MPJ-01A, with 350 psi differential pressure and no centralization. Moderate differential sticking was encountered while running the centralized slotted liner on the MP J-09A well with 9.1 lb/gal mud and 300 psi differential pressure. d) To reduce the risk of becoming differentially stuck with the 4-1/2" Bonzai liner, the BARADRILn mud weight is programmed to be 9.1 ppg. This is 0.5 ppg lower than was run in the J-01A well and will be accomplished by decreasing the calcium carbonate and KCI concentrations. No compromise in well bore stability is anticipated as a result o. e density or KCI concentration changes. . o . 10. 11. 12. Pad Data Sheet a) Please Read the H-Pad Data Sheet Thoroughly. Breathing: a) No breathing problems are expected drilling the Ugnu or the Schrader Bluff formations. Hydrocarbons: a) Will be kicking off in the Ugnu interval which is oil charged in this area, therefore the first possible hydrocarbon zone will be the Ugnu formation just outside of the window Geosteering: ~ a) -['wo rig site geologists are required onsite for accurate geosteering through the thin OA sands b) It is critical that we achieve 100% in zone drilling of the OA Sand interval in order to obtain enough pay sand to meet the oil rate production goals. HES Cement Retainer: a) The cement retainer was e-line set 3' below a 7" casing coupling. The window is planned to be milled in the middle of a short 20' marker joint of 7" casing. Hole Cleaning and Hole conditions: a) This well has a 80° tangent angle above the planned kick off point. Good window milling and hole cleaning practices will be critical in ensuring that metal and formation cuttings are removed from the well. b) Monitor metal cuttings returns to ensure that the metal is being effectively removed during and after the milling job. While drilling, utilize PWD to monitor hole cleaning efficiency. c) Monitor and record torque and drag data closely to check against modeling to help determine what level of differential sticking or cuttings beds may be occurring during drilling to help make the decision on running the 4-1/2" liner. d) If the Bonzai ECP does not reach the programmed setting depth below the "N" sand, the well could be in jeopardy from sand and water production. The final determination of w-~ether to run the full Bonzai liner will be made based on hole conditions as the well reaches TD. For this reason it is critical that the rig team effectively communicate all information about hole conditions to Anchorage. Hydrogen Sulfide a) MP H Pad is not designated as an H2S Pad. Drilling Program Overview Surface and Anti-Collision Issues Surface Shut-in Wells: No wells need to be shut-in for the rig move on and off MP H-08A. Close Approach Wells: There are n~'~Close approach wells in the H-08A directional plan IWell Name Current Status I Production Priority Precautions None J J Well Control: Expected Formation Pressures & BOPE Test Pressures Expected BHP Max Exp Surface Pressure BOPE Ratin~l 1,775 psi, 4,000' TVD 1,315 psi 5,000 psi WP (estimated) (.115 psi/ft gas gradient) (entire stack & valves) Planned BOPE Test Pres. 2,000/250 psi Rams and Valves 2,000/250 psi Annular Mud Program Production Mud Properties: 6% KCL BaraDriln ! 6" hole section Density (ppg) J Funne, vis J ~, i .~., i 9.1 40 - 55 20 - 27 10 - 15 pH J APl Filtrate J LG Solids 8.0 - 8.5 4 - 6 < 15 ppb NOTE: See attached Baroid mud recommendation LCM Restrictions: No Organic LCM products in the Schrader BlUff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site. Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or ARCO KRU 1R. Formation Markers Formation Tops MD TVDss Pore Psi EMW (ppg) Comments TUZC TUZB Planned Kick Off Point KOP 8598 384O NA 8734 3930 8.65 NB 8776 3954 8.65 NC 8840 3987 8.65 NE 8875 4003 8.65 NF 8998 4046 8.65 TOA 9228 4080 8.50 Top OA sand. Set ECP in the sand 'TOB TD Casing/Tubing Program Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tb9 O.D. MD/TVD MD/TVD 6" 4 1/2" 12.6# L-80 I BT-Mod 780' 8450'/3,800' 9228'/4,146' Banzai Tubing 4-1/2" Jet 12.6# L-80 IBT-Mod 8,400' 30'/30' 8,400'/3,785' Pump Cement Calculations ILiner Size I 4 Y=" Banzai IBT-Mod I BasisI 0% excess in open hole (6" hole), No cement in liner lap/7" casin~l) or above liner top (3 W' dp) I ECP 9,228' MD (4,146' TVDrkb), Window at 8,597' (3,906'), Liner top at 8,450' (3,800') ITotal Cement Volume: Spacer Tail Temp INone if well displaced to completion fluid. Contingency 15 bbls of B45 Viscosified Spacer Weighted to 10.2 ppg if cementing in mud 52 sxs, Class 'G'+ .30%D65 + .12%B71 + .4% D167 + .2% D046 BHST -80° F from SOR, BHCT 85° F estimated by Dowell Centralizer Placement: 1. Run (1) rigid straight centralizer'per joint 2. Run each centralizer floating in the middle of each joint of casing. Other Cement Considerations: 1. Batch mix this single slurry. Survey and Logging Program 6" Section: Open Hole: MWD / GPJRes I PWD - Over production interval. Sample Catchers - None! Cased Hole: None Perforating: None Bit Recommendations BHA Hole Size Depths (MD) Bit Type Nozzle ! Flow Rate K-Rev's Hours Number and Section 1 6" 8,600' - 12,746' PDC 15-15-15: 250+ gpm ~ - Motors and Required Doglegs BHA Motor Size and Motor Flow Rate RPM's Required Doglegs Number Required I 4 3~,, Sperrydrill 4/5, 6.3 stg Slow 250 - 300 gpm 75 mtr, 60 Build out of window at (PDC) Speed, 1.15° adj w/5.9" sleeve rotate 11°/100 to horizontal. Drill to TD. MP H-08A Operations Summary Pre-Rig Operations 1. The prerig decompletion work has been done by Nabors 4ES Snapshot of Well Pro(~ram 1. MIRU Nordic 3. 2. ND Tree, NU Stack and Test. 3. Run and set whipstock on EZSV. Mill window. 4. MU 6"BHA. RIH. 5. Drill 6" hole. Build angle and steer to land horizontal in OA sand. 6. Displace hole to new BARADRILn mud. Drill horizontal section. 7. Run 4-1/2" Bonzai liner. 8. Set liner hanger. Inflate ECP and cement top liner interval above slotted liner. POOH. 9. RIH open ended. Cleanout if required and displace hole to 8.8 KCL completion fluid 10. Run 4-1/2" jet pump completion. 11. ND BOPE, NU tree. Release rig. WELLHEAD: FMC Gen 6 11", 5M tbg. head ~ " ' Cellar Box ELEV = 36.00' 11" x 4-1/2", NSCT (top & btm) FMC tbg. hanger, 'H' BPV profile 110' I 20" 92 lb/It, H-40 Welded ~~ · I 4-1/2", 12.6 Ib/ft, L-80, IBT Drift]ID: 3.833"/3.958" Capacity: .01522 bbl/ft Selective X Nipple 3.813" ID 7", 26#, L-80, UTC Baker CMU Sliding Sleeve with 3.813 ID Selective X Profile Drift. I.D.: 6.151" Capacity: .0383 bbl/ft ~ ~i~!!i~i Baker S3 Packer 8,300' Wireline Entry Guide ~] ~ 7" x 4 1/2" liner/hgr pkr. 8,450' ~.-.-;~:i~i iiili Baker ECP (top of 'OA' sand) 9,228' ~:~:i~:::, 6" Hole TD 12,746' 4-1/2", 12.6# L-80, Banzai Liner ] Window in 7" casing @ 8,598' I I Cement retainer at 8,606' 6" Hole Left as Open Hole Completion All Perforations P & A'd Perfs: 894o'-8960' Perfs: 9o14'-9034' .UTe I 9167' I~ TD I 9,275' ] · ~ ~ DATE REV. BY COMMENTS Miln~ Pcdnt Unit WELL: H-0RA APl NO' 12/12/99 FJ Horizontal Sidetrack BP Exploration (Alaska) Tree: 2 9/16" 5M Wellhead: 11" 5M FMC Gen 6 2-7/8" 8rd. EUE bottom and top, 2.5" CIW BPV profile. 20" 91.1 ppf, H-40 I 110' MPU H-OS(ACTUAL) Orig. KB Elev. = 64.9' (N 22E) Orig. GL Elev. = 36.0' RT To Tbg. Spool = 30.6' (N 22E) KOP @ 300' Max. hole angle = 78 to 80 deg. f/3600' to 7450' Hole angle thru' perfs = 44 deg. 7" 26 ppf, L-80, BTC mod production csg. ( drift ID = 6.276", cap. = 0.0383 bpf ) Stimulation Summary 06/11/98 - 'OB' Sand, 24,260 lbs. 12-20 Ottowa proppant behind pipe coated w/ PropLok resin - natural color (no dye) 06/13/98 - 'CA' Sand, 54,900 lbs. 12-20 Ottowa proppant behind pipe coated w/ PropLok resin - natural color (no dye) Proposed Perforation Summary Ref log: GR / CCI 06/xx/98 Size SPF Interval (TVD) 'N' Sand to ~e co~pleted at a later;late 'CA' Sand 4.5" 4 8,940' - 8,960' (4,150'-4,165') 'OB' Sand 4.5" 4 9,014'- 9,034' (4,203'-4,217') DIESEL FP to 2150' SEAWATER Howco 7 .... ES" Cementer I 2,100' Two 7" x 20' marker Jts. from 8,562' to 8,602' md ~nt Cement Retainer I 8~606' md I 28 gm Jumbo Jet ("big hole") charges @ 0 - 180 deg. phasing (TTP = 5.2", EHD = 0.93"). DATE 10-01-97 6/20/98 10/04/99 12/12/99 REV. BY JBF M. Linder M. Triolo F. Johnson COMMENTS ~rilled and Cased by Nabors 22E Frac and completion by Nabors 4-ES Proposed decompletion by Nabors 4ES Actual decomplet~on status 7" landing collar (PBTD) 7" float collar 7" float shoe 9,167' md 9,209' md 9~251' md MILNE POINT UNIT WELL No: H-08 APl: 50-029-22808 BP EXPLORATION (AK) I DrillQuest~ North Slope Alaska Alaska State Plane 4 Milne Point MPH MPH-08A · '~: ~ ~! ~ '.:~::~t~ 4000 ...::......::::.. ..... :::::::::::::::::::::::::::::::::::::: .... .. ~;~:~:::::::::~;~::::::~::[;~:.:.:.:.~:~:.:.:~:.:~:~:.:.:.~:.~:.:.:.:.:.:.:.:.:~:.:~:.:.~:.:~:~:.:.~:.~:.:.:.:~:.:.:.:.:.:~:~:.:~:.:~:.:~:.:.~:.~:.:.:.:.:~:~:~:.:~:.:.~:.:.:. ..... ...... ~ : : : :: : : : : : ~C- 405~.f~) ~D - Point ~; ............................................................................................................................................................. ~,~.~.~: ~ ~ ........... ~.4~.~ ~500 7000 7500 8000 8500 9000 0500 ~ 0000 ~ 0500 Scalo: ~ inch = 500~ Vo~ical ~octio~ Section Azimuth: ~ 30.627° (True Nodh) I DrillQuest North Slope Alaska Alaska State Plane 4 Milne Poin~cMPt~ch = 500ft MPH-08A 5500 6000 I Eastings 65OO 700O I I 75OO I 8OO0 I Tie-on, Start Dir @ 8.000°/100ft: 8597.40ft MD, 3905.88ft TVD Dir Rate Increase @ 11.000°/100ft: 8627.40ft MD, 3926.93ft TVD -3500 End Dir: 9091.70ft MD, 4130.00ft 'I'VD Start Dir @ 8.000°/100ft: 9176.88ft MD, 4140.49ft TVD -4000 4146.00 TVD 3876.08 S, MPH-O8A(15-Nov) Poly -4500 co) -5000 ._ O Z -5500 -6000 -6500 II I,- ~ -7000 MPH-O8A Wp07 T2 - Point 4146.00 TVD 4679.71 S, 6545.39 E End Dir: I I 5500 6000 6500 Scale:linch = 500ff @ 0.000°/100ft: 10139.14ft MD, 4146.00ft TVD l1.41ft MD, 4146.06ft TVD Total Depth: 12746.11ft MD, I 7000 Eastings Wp07 T3 - Point 4156.00 TVD 6810.34 S, 7938.26 E I 7500 I 8000 Reference is True North - -3500 - -4O0O - -4500 --5000 - -5500 - -6000 - -6500 --7000 .~ North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) 8597.40 44.729 117.668 3839.88 8600.00 44.849 117.910 3841.73 8627.40 46.139 120.395 3860.93 8650.00 47.557 123.194 3876.39 8700.00 50.918 128.946 3909.05 8734.13 53.363 132.556 3930.00 8750.00 54.535 134.155 3939.34 8775.89 56.492 136.668 3954.00 8800.00 58.356 138.905 3966.98 8839.97 61.529 142.422 3987.00 8850.00 62.339 143.271 3991.72 8875.16 64.394 145.347 4003.00 8900.00 66.449 147.326 4013.33 8950.00 70.658 151.131 4031.62 8998.46 74.809 154.635 4046.00 9000.00 74.941 154.744 4046.40 9050.00 79.280 158.213 4057.56 9091.70 82.927 161.028 4064.00 9100.00 82.927 161.028 4065.03 9150.00 82.927 161.028 4071.18 9176.88 82.927 161.028 4074.49 9200.00 84.758 160.760 4076.97 9228.16 86.988 160.436 4079.00 9250.00 88.716 160.186 4079.82 9266.21 90.000 160.000 4080.00 Sperry-Sun Drilling Services Proposal Report for MPH-O8A Wp07 Revised: 1 December, 1999 Vertical Local Coordinates Depth Northings Eastings (ft) . (ft) (ft) 3905.88 3377.44 S 5759.54 E 3907.73 3378.30 S 3926.93 3387.82 S 3942.39 3396.51S 3975.05 3418.82 S 3996.00 3436.42 S 4005.34 3445.23 S 4020.00 3460,43:~S: 4032.98 3475;47S 4053.00 3502;23 S 4057.72 3509;29S 5908.38 E 4069.00 3527.55 S 5921.50 E 4079.33 3546.35 S 5934.01E 4097.62 3586.33 S 5957.79 E 4112.00 3627,51S 5978,86 E 4112.40 3628.86S 5979.50 E 4123.56 3673.53 S 5998.93 E 413~00 3712.14 S 6013.27E 4131.03 3719.93 S 6015.95 E 4137.18 3766.86 S 6032.08 E 4140.49 3792.08 S 6040.75 E 4142,97 3813.80S 6048.27 E 4145.00 3840.30S 6057.61E 4145.82 3860.84S 6064.96 E 4146.00 3876.08S 6070.48E 5761.16 E 6~,575.42 N 562377.91 5778.22 E ;: 60~$66.03 N 562395.05 45 N 562409.12 582~'i~..E ': 60065~.37 N 562439.84 584:3i~.18:E i 6006517.93 N 562460.38 58521~:~ E 6006509.19 N 562469.77 ....... : 586~:i~8 fi 6006494.10 R 562484.86 5~:1~13 E 6006479.16 N 562498.62 5003.03 E 6006452.57 N 562520.72 Alaska State Plane 4 Milne Point MPH Dogleg Vertical Rate Section (°~00~) (~) E 6570.45 E 8.000 6572.24 E 8.000 6591.39 E 11.000 6607.68 E 11.000 6645.40 E 11.000 6672.34 E 11.000 6685.15 E 11.000 6706.41 E 11.000 6726.56 E 11.000 6760.61 6006445.56 N 562526.12 E 11.000 6769.26 6006427.39 N 562539.38 E 11.000 6791.11 6006408.69 N 562552.04 E 11.000 6812.86 6006368.89 N 562576.12 E 11.000 6856.93 6006327.87 N 562597.50 E 11.000 6899.74 6006326.53 N 562598.15 E 11.000 6901.10 6006282.00 N 562617.92 E 11.000 6944.94 6006243.50N 562632.55 E 11.000 6980.96 6006235.73 N 562635.29 E 0.000 6988.06 6006188.93 N 562651.77E 0.000 7030.86 6006163.78 N 562660.64 E 0.000 7053.86 6006142.11 N 562668.33 E 8.000 7073.72 6006115.69 N 562677.86 E 8.000 7098.05 6006095.20 N 562685.36 E 8.000 7117.01 6006080.00 N 562691.00 E 8.000 7131.12 Comment Tie-on Start Dir @ 8,000°;/100ft: 8597.40ft MD, 3905.88ft TVD Dir Rate Increase @ 11.000°/100ft: 8627.40ft MD, 3926.93ft TVD NA NB NC NE NF End Dir' 9091.70ft MD, 4130.00ft TVD Start Dir @ 8.000°/100ft' 9176.88ft MD, 4140.49ft TVD OA Tamet - MPH-O8A Wp07 T1, Geological Continued... 1 December, 1999 - 15:17 - 1 - DrillQuest 1.05.04c North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (~) (~) 9300.00 90.000 157.297 4080.00 9350.00 90.000 153.297 4080.00 9400.00 90.000 149.297 4080.00 9407.65 90.000 148.685 4080.00 9450.00 90.000 148.685 4080.00 9500.00 90.000 148.685 4080.00 9550.00 90.000 148.685 4080.00 9600.00 90.000 148.685 4080.00 9650.00 90.000 148.685 4080.00 9700.00 90.000 148.685 4080.00 9750.00 90.000 148.685 4080.00 9800.00 90.000 148.685 4080.00 9850.00 90.000 148.685 4080.00 9900.00 90.000 148.685 4080.00 9950.00 90.000 148.685 4080.00 10000.00 90.000 148.685 4080.00 10050.00 90.000 148.685 4080.00 10100.00 90.000 148.685 4080.00 10139.14 90.000 148.685 4080.00 10150.00 90.000 148.034 4080.00 10200.00 90.000 145.034 4080.00 10200.56 90.000 145.000 4080.00 10231.41 89.774 146.837 4080.06 10250.00 89.774 146.837 4080.13 10300.00 89.774 146.837 4080.33 Sperry-Sun Drilling Services Proposal Report for MPH-O8A Wp07 Revised: 1 December, 1999 Ve~ical Local Coordinates Depth Nothings Eastings No,hi a~ti~.gs 4146.00 3907.55 S 6082.78 E 6006048'ii~iN .. ~ ?i[~2703.54 E 4146.00 3952.96 S 6103.67 E 6006003.37N''~='=~' 562724.77 E 4146.00 3996.81S 6127.68 E 6~5959.71N 562749.11E 4146.00 4003.378 6131.62 E .=60~5953.18 N 562753.10 E 4146.00 4039.55 S 6153.63 E ~[~'i16~05~i17.17 N 562775.39 E 4146.00 4082.278 6179,62::Ei?i::~;:~.60058~4.65N--"~'~: 562801.70E 4146.00 4124.988 6205:i~.E ?160058~.14N 562828.01E 4146.00 4167.70 S 6231.59iE:::.::i:i~ 6005789.62 N 562854.32 E 4146.00 4210.41S 6257~58 E'..':!!ii~6005747.10 N 562880.63 E 4146.00 4253.13 S 6283;56 E .? 6005704.58 N 562906.94 E 4146.00 4295~85 S 6309.55 E 6005662.06 N 562933.25 E 4146.00 4338;56 S 6335.54 E 6005619.55 N 562959.56 E 4146.00 4381~28:S 6361.53 E 6005577.03 N 562985.87 E 4146.00 4423.998 6387.51E 6005534.51N 563012.18 E 4146.00 4466.71S 6413.50 E 6005491.99 N 563038.49 E 4146.00 4509.43 S 6439.49 E ' 6005449.48 N 563064.81 E 4146.00 4552.14 S 6465.47 E 6005406.96 N 563091.12 E 4146.00 4594.86 S 6491.46 E 6005364.44 N 563117.43 E 4146.00 4628.30 S 6511.80 E 6005331.15 N 563138.02 E Dogleg Rate (°/100~) 8.000 8.000 8.000 8.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4146.00 4637.54S 6517.50 E 6005321.95 N 563143.79 E 4146.00 4679.25 S 6545.07 E 6005280.46 N 563171.67 E 4146.00 4679.71S 6545.39 E 6005280.00N 563172.00E 4146.06 4705.26 S 6562.68 E 6005254.58 N 563189.48E 4146.13 4720.82 S 6572.85 E 6005239.10 N 563199.77E 4146.33 4762.688 6600.20 E 6005197.45 N 563227.43 E 6.000 6.000 6.000 6.000 0.000 0.000 Alaska State Plane 4 Milne Point MPH Ve~ical Section (~) 7160.95 7206.37 7253.15 7260.40 7300.67 7348.21 7395.74 7443.28 7490.82 7538.36 7585.89 7633.43 7680.97 7728.50 7776.04 7823.58 7871.11 7918.65 7955.87 Comment 7966.21 8014.29 8014.83 8044.59 8062.44 8110.45 Dir Rate Decrease @ 0.000°/100ft '. 10139.14ft MD, 4146.00ft TVD Tamet - MPH-08A Wp07 T2, Geological End Dir' 10231.41ft MD, 4146.06ft TVD Continued... 1 December, 1999- 15:17 -2- DrillQuest 1.05.04c North Slope Alaska Sperry-Sun Drilling Services Measured Sub-Sea Ve~ical Depth Incl. Azim. Depth Depth (~) (~) (~) 10350.00 89.774 146.837 4080.53 4146.53 10400.00 89.774 146.837 4080.73 4146.73 10450.00 89.774 146.837 4080.92 4146.92 10500.00 89.774 146.837 4081.12 4147.12 10550.00 89.774 146.837 4081.32 4147.32 10600.00 89,774 146.837 4081.52 4147.52 10650.00 89.774 146.837 4081.72 4147.72 10700.00 89.774 146.837 4081.91 4147.91 10750.00 89.774 146.837 4082.11 4148.11 10800.00 89.774 146.837 4082.31 4148.31 10850.00 89.774 146.837 4082.51 4148.51 10900,00 89.774 146.837 4082.70 4148.70 10950.00 89.774 146.837 4082.90 4148.90 11000.00 89.774 146.837 4083.10 4149.10 11050.00 89.774 146.837 4083.30 4149.30 11100.00 89.774 146.837 4083.49 4149.49 11150.00 89.774 146.837 4083.69 4149.69 11200.00 89.774 146.837 4083.89 4149.89 11250.00 89.774 146.837 4084.09 4150.09 11300.00 89.774 146.837 4084.28 4150.28 11350.00 89.774 146.837 4084.48 4150.48 11400.00 89.774 146.837 4084.68 4150.68 11450.00 89.774 146.837 4084.88 4150.88 11500.00 89.774 146.837 4085.07 4151.07 11550.00 89.774 146.837 4085.27 4151.27 Proposal Report for MPH-O8A Wp07 Revised: 1 December, 1999 Local Coordinates Northings Eastings (ft) (ft) (ft)~?~'~,~~,~ (ft) 4804.53 S 6627.55 E 6005155'~iiN. ::?i~:.~63255.10 E 0.000 4846.39 S 6654.90 E 6005114.16 N:':: :':~ 563282.77 E 0.000 .. 4888.24 S 6682.25 E 6005072.51 N 563310.44 E 0.000 4930.10 S 6709.60 E .::: 60~030.87 N 563338.10 E 0.000 4971.95 S 6736.95 E : :~00~989.22 N 563365.77 E 0.000 · 5013.81 S 6764.,3~:E:~ - '::"::':: 60049~::57 N 563393.44 E 0.000 5055.66 S 6791::16~E:.: :;:::. 600490~.93 N 563421.11 S 0.000 5097.52 S 6819.00 E 6004864.28 N 563448.77 E 0.000 5139.38 S 6846,36 E 6004822.63 N 563476.44 E 0.000 5181.23 S 6873:71 E 6004780.99 N 563504.11 E 0.000 Dogleg Rate (°/100ft) 5223;09 S 6901;06 E 6004739.34 N 563531.78 E 0.000 5264':94 S 6928.41E 6004697.69 N 563559.45 E 0.000 5306~80 S 6955.76 E 6004656.05 N 563587.11E 0.000 5348.65 S 6983.11E 6004614.40 N 563614.78 E 0.000 5390.51S 7010.46 E 6004572.75 N 563642.45 E 0.000 5432.36 S 7037.81E 6004531,10 N 563670.12 E 0.000 5474.22 S 7065.16 E 6004489.46 N 563697.78 E 0.000 5516.08S 7092.51 E 6004447.81 N 563725.45 E 0.000 5557.93 S 7119.86 E 6004406.16 N 563753.12 E 0.000 5599.79 S 7147.22 E 6004364.52 N 563780.79 E 0.080 5641.64 S 7174.57 E 6004322.87 N 563808.46 E 0.000 5683.50 S 7201.92 E 6004281.22 N 563836.12 E 0.080 5725.35 S 7229.27 E 6004239.58 N 563863.79 E 0.000 5767.21 S 7256.62 E 6004197.93 N 563891.46 E 0.000 5809.06 S 7283.97 E 6004156.28 N 563919.13 E 0.000 Alaska State Plane 4 Milne Point MPH Ve~ical Section (fi) 8158.46 8206.47 8254.48 8302.50 8350.51 8398.52 8446.53 8494.54 8542.56 8590.57 8638.58 8686.59 8734.60 8782.61 8830.63 8878.64 8926.65 8974.66 9022.67 9070.69 9118.70 9166.71 9214.72 9262.73 9310.74 Comment Continued... 1 December, 1999- 15:17 - 3 - DrillQuest 1.05.04c North Slope Alaska Measured Sub-Sea Depth Incl. Azim. Depth (~) (~) 11600.00 89.774 146.837 4085.47 11650.00 89.774 i46.837 4085.67 11700.00 89.774 146.837 4085.87 11750.00 89.774 146.837 4086.06 11800.00 89.774 146.837 4086.26 11850.00 89.774 146.837 4086.46 11900.00 89.774 146.837 4086.66 11950.00 89.774 146.837 4086.85 12000.00 89.774 146.837 4087.05 12050.00 89.774 146.837 4087.25 12100.00 89.774 146.837 4087.45 12150.00 89.774 146.837 4087.64 12200.00 89.774 146.837 4087.84 12250.00 89.774 146.837 4088.04 12300.00 89.774 146.837 4088.24 12350.00 89.774 146.837 4088.43 12400.00 89.774 146.837 4088.63 12450.00 89.774 146.837 4088.83 12500.00 89.774 146.837 4089.03 12550.00 89.774 146.837 4089.22 12600.00 89.774 146.837 4089.42 12650.00 89.774 146.837 4089.62 12700.00 89.774 146.837 4089.82 12746.11 89.774 146.837 4090.00 Sperry-Sun Drilling Services Proposal Report for MPH-O8A Wp07 Revised: 1 December, 1999 Vertical Local Coordinates Depth Northings Eastings (~) (~) (~) 4151,47 5850,92S 7311,32E 600411~:!~:N :563946,79E 4151,67 5892,78S 7338,67E 6004072,99N':??~'S63974,46E 4151,87 5934,63 S 7366,02 E 6004031,34 N 564002,13 E 4152,06 5976,49 S 7393,37 E ~.~:~.60~3989,70 N 564029,80 E 4152,26 6018,34 S 7420,72 E ~;.:'76003948,05~ N 564057,47 E 4152,46 6060,20 S 7448,0~iii~?~':?:i!:iii~ 6003~6~40~: ':: -~ N 564085,13 E 4152,66 6102,05 S 7475;~i.:E~ !;ii:i;ii60038~'76: -~- N 564112,80 E 4152,85 6143,91S .,~502~78i!E~:...;:'6003823,11N 564140,47 E 4153,05 6185,77S .:~530;:t3 ~'i::'i 6003781,46 N 564168,14 E · 4153,25 6227,62S :75571~8 E · 6003739,82 N 564195,80 E 4153,45 6269;48 S 7584,83 E 6003698.17 N 564223,47 E 4153,64 631:1,33 S :i 7612.18 E 6003656,52 N 564251,14 E 4153,84 6353,19S 7639,53 E 6003614,87 N 564278,81E 4154,04 6395,04 S 7666,88 E 6003573,23 N 564306,48 E 4154,24 6436,90S 7694,23 E 6003531,58 N 564334,14 E 4154,43 6478,75 S 7721,58 E 6003489,93 N 564361,81 E 4154,63 6520,61S 7748,94 E 6003448,29 N 564389,48 E 4154,83 6562,47 S 7776.29 E 6003406,64 N 564417,15 E 4155,03 6604,32 S 7803.64 E 6003364,99 N 564444,81E 4155,22 6646,18 S 7830,99 E 6003323,35 N 564472,48 E 4155,42 6688,03 S 7858,34 E 6003281,70 N 564500,15 E 4155,62 6729,89 S 7885,69 E 6003240,05 N 564527,82 E 4155,82 6771,74 S 7913,04 E 6003198,41 N 564555,48 E 4156,00 6810,34S 7938,26 E 6003160,00N 564581,00E Dogleg Rate (°/100ft) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Alaska State Plane 4 Milne Point MPH Vertical Section (ft) 9358.76 9406.77 9454.78 9502.79 9550.80 9598.82 9646.83 9694.84 9742.85 9790.86 9838.87 9886.89 9934.90 9982.91 10030.92 10078.93 10126.94 10174.96 10222.97 10270.98 10318.99 10367.00 10415.02 10459.29 Comment Total Depth: 12746.1 lft MD, 4156.00ft TVD Tamet - MPH-08A Wp07 T3, Geological Continued,,, 1 December, 1999 - 15:17 - 4 - DrillQuest 1.05.04c Vt:mA;M ll~! ,~,I,~.A,~ I ] Zi. (JtJ DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET )~279c; CK10279c~]: 100. O0 100. O0 IANDL]:NG TNST: S/H TERRIE HUBBLE X4&28 ,11'ACI~D CHECK I~ m PAYI~I~r ~ rl~ll~ I)~CRI~J) A~OVL ~ 1 OO. OO 1, O(") ("JO 'm!~IST':N~ATI~-SANK OF ASHLAND · ::.:..:i! .".'.!' .:A~iA~A'r~.~.. -:: !i:'..:' ::: '.: .. ':'.:!:::.:i ::...:' N~.'~I~:.0.1TY.B~K ...... :. :'. ': i: :CLEVELAND, 0HIO . .: ' "';i: ".:56-389:- 412 NO. H co.S~,c~D.:~,.~c,~^cc~u,~ '00158'1 ~Y "."::i.':':' '.i.:::..-":~':;i:' "' ' :::::::::::::::::::::: DATE -. :.:'::.:: :..' '-::.:- :...'.:.".' NO~i[VAUD AFTER 1~0 D~..YS,: ". ..:.. '.::' .".. .::':':." . ~;;;. ':.:'..:.:. '::~'::::.i:" ...': "~ ........... ' ........ :i~bcCd!i::::':' :::,::' :~ii'::: :::::::::::::::::::::::: ": :::::::::::::::::::::::: :'". ' ANCHORAOE AK 99501-312::)0 ""L58Lcir--,"" ':OhL;30:~Sc]5~: O0~hhLci." WELL PERMIT CHECKLIST FIELD & POOL ~' ~--~-"'//~//~'~ INIT CLASS ~ ~ t/ 7'0//_.. WELL NAME/~P~ /t/~:;~,~ PROGRAM: exp dev GEOL AREA ~?~ ADMINISTRATION COMPANY 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11.. Permit can be issued without donservation order ........ N Permit can be issued without administrative approval ...... ~,, N Can permit be approved before 15-day wait ........... · ENGINEERING ~DATE 12. 13. ,, v'/redrll v'"' serv wellbore seg ann. disposal para req :GEOLOGY 14. Conductor string provided .............. . ..... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ........... . ...... 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to c~O~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. IIANNULAR DISPOSAL APPR DATE UNIT# ON/OFF SHORE ~,~ Y 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data presented on potential overpressure zones-~. ...... 32. Seismic analysis of shallow gas zones ............. 33. Seabed condition survey (if off-shore) ............. 34. Contact name/phone for weekly progress reports [exploratory only~ N 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ..... . .~.~ N (B) will not contaminate freshwater; or cause drilling w~3ste~... Y N to surface; (C) will not impair mechanical integrity ofth~w~ll used for disposal; Y N (D) will not damage producing formatio~ ~covery from a Y N pool; and ~ (E) will not circumvent 20 AAC 25152 or 20 AAC 25.412. Y N GEOLOGY.: ENGINEERING: UlClAnnular COMMISSION: RP ' ' BEVV"'"~ WIVI~'~'"---~ DWJ  JDH .~ RNC' c:\msoffice\wordian\diana\checklist (rev. 09/27/99) Comments/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this natUre is accumulated at the end of the file under APPENDIXl ., No 'special*effort has been made to chronologically organize this category of information. .o Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue Feb 15 12:03:05 2000 Reel Header Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 2 AK-MM-90216 BRETT HENNIN DON WESTER MPH-08A 500292280801 B.P Exploration, Alaska Sperry Sun 15-FEB-00 MWD.RUN 3 AK-MM-90216 MEL GABEL DON WESTER 34 13N 10E 2767 1120 65.68 65.68 36.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 8588.0 6.000 9224.0 6.000 12164.0 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RECEIVED FEB 22 2000 Alaska Oil & Gas Cons. Commission Anchorage REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. , 3. MWD RUNs 2&3 ARE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING A SCINTILLATION DETECTOR, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 4. THE SHALLOW-SPACING RESISTIVITY SENSOR (SESP) FAILED AT 8941'MD, 4115'TVD. 5. DIGITAL AND LOG MWD DATA ARE DEPTH-CORRECTED TO THE PDC GR LOG OF 09/28/98 WITH KBE = 64.9' A.M.S.L. THIS WELL KICKS OFF FROM MPH-08 AT 8588'MD, 3899'TVD, AND FROM MPH-08A PB1 AT 9052'MD, 4148'TVD. ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 6. MWD RUNS 1-3 REPRESENT WELL MPH-08A WITH API%: 50-029-22808-01. THIS WELL REACHED A TOTAL DEPTH OF 12164'MD, 4235'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 8566.0 12111.5 RPD 8580.0 12118.5 RPM 8580.0 12118.5 RPS 8580.0 8941.5 RPX 8580.0 12118.5 FET 8599.5 12118.5 BASELINE DEPTH 8566.0 8569.0 8575.0 8580.0 8581.5 8584.5 12164.5 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: ~OP 8618.5 12164.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH GR 8565.0 8567.5 8573.5 8577.5 8580.5 8583.5 12163.5 BIT RUN NO MERGE TOP MERGE BASE 200 8565.0 9224.0 300 9224.0 12164.0 MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 Name Service Unit Min Max DEPT FT 8566 12164.5 ROP MWD FT/H -6.54 756.77 GR MWD API 32.83 136.41 RPX MWD OHMM 0.12 1760.17 RPS MWD OHMM 0.06 1760.18 RPM MWD OHMM 0.52 2000 RPD MWD OHMM 1.24 2000 FET MWD HOUR 0.3239 73.0391 Mean 10365.3 108.162 79.9297 27.2667 15.4048 40.756 41.3233 2.20966 Nsam 7198 7093 7092 7078 724 7078 7078 7039 First Reading 8566 8618.5 8566 8580 8580 8580 8580 8599.5 Last Reading 12164.5 12164.5 12111.5 12118.5 8941.5 12118.5 12118.5 12118.5 First Reading For Entire File .......... 8566 Last Reading For Entire File ........... 12164.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... ~ersion Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8565.0 RPD 8577.5 RPM 8577.5 RPX 8577.5 RPS 8577.5 FET 8598.5 ROP 8617.5 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9171.5 9178.5 9178.5 9178.5 8940.5 9178.5 9224.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): 04-JAN-00 Insite 6.54 MEMORY 9224.0 8565.0 9224.0 45.2 77.5 TOOL NUMBER PB1349GRV4 PB1349GRV4 6.000 8588.0 Water Based 9.10 48.0 8.4 27000 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 3.6 .170 .124 .160 .200 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 RPX MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPM MWD 2 OHMM 4 1 68 20 6 RPD MWD 2 OHMM 4 1 68 24 7 FET MWD 2 HOUR 4 1 68 28 8 70.0 98.1 70.0 70.0 Name Service Unit DEPT FT ROP MWD 2 FT/H GR MWD 2 API RPX MWD 2 OHMM RPS MWD 2 OHMM RPM MWD 2 OHMM RPD MWD 2 OHMM FET MWD 2 HOUR Min Max 8565 9224 0.68 289.12 32.83 136.41 0.12 1760.17 0.06 1760.18 0.52 1971.75 1.24 1825.44 0.3239 73.0391 Mean Nsam 8894.5 1319 81.5895 1214 81.082 1214 15.0722 1203 15.3461 727 29.8248 1203 40.5158 1203 4.28001 1161 First Reading 8565 8617.5 8565 8577.5 8577.5 8577.5 8577.5 8598.5 Last Reading 9224 9224 9171.5 9178.5 8940.5 9178.5 9178.5 9178.5 First Reading For Entire File .......... 8565 Last Reading For Entire File ........... 9224 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum PhYsical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9172.5 12110.5 RPD 9179.5 12117.5 RPM 9179.5 12117.5 RPX 9179.5 12117.5 FET 9179.5 12117.5 ROP 9225.0 12163.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL 12-JAN-00 Insite 6.54099988937378 MEMORY 12164.0 9224.0 12164.0 78.3 94.7 TOOL NUMBER PB01402HWM4 PB01402HWM4 6.000 Water Based 9.10 47.0 8.4 28000 4.2 .040 .027 .190 .180 70.0 108.0 70.0 70.O MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 3 FT/H 4 1 68 4 2 GR MWD 3 API 4 1 68 8 3 RPX MWD 3 OHMM 4 1 68 12 4 RPM MWD 3 OHMM 4 1 68 16 5 RPD MWD 3 OHMM 4 1 68 20 6 FET MWD 3 HOUR 4 1 68 24 7 Name Service Unit DEPT FT ROP MWD 3 FT/H GR MWD 3 API RPX MWD 3 OHMM RPM MWD 3 OHMM RPD MWD 3 OHMM FET MWD 3 HOUR Min Max Mean Nsam 9172.5 12163.5 10668 5983 3.09 756.77 113.658 5878 46.84 115.78 79.7063 5877 4.9 1643.95 29.7505 5877 6.05 2000 43.0906 5877 6.61 2000 42.2989 5877 0.4053 26.9648 1.79655 5877 First Reading 9172.5 9225 9172.5 9179.5 9179.5 9179.5 9179.5 Last Reading 12163.5 12163.5 12110.5 12117.5 12117.5 12117.5 12117.5 First. Reading For Entire Filel ......... 9172.5 Last Reading For Entire File ........... 12163.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services~ Reel Trailer Service name ............. LISTPE Date ..................... 00/02'/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments..' ............... STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue Feb 15 12:05:48 2000 Reel Header Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number .... -..01 Previous Reel Name ....... UNKNOWN Comments - STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF RECEIVED Comment Record TAPE HEADER Milne Point MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD MWD RUN 2 AK-MM-90216 BRETT HENNIN DON WESTER Nask~ Oil & Gas Cons. Gom,'n~lon Anchorage OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 8588.0 6.000 6.000 34 13N 10E 2767 1120 65.68 65.68 36.00 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING MPH-08A PB1 500292280870 B.P Exploration, Alaska Sperry Sun 14-FEB-00 /~EMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING A SCINTILLATION DETECTOR, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 4. THE SHALLOW-SPACING RESISTIVITY SENSOR (SESP) FAILED AT 8941'MD, 4115'TVD. 5. DIGITAL AND LOG MWD DATA ARE DEPTH-CORRECTED TO THE PDC GR LOG OF 09/28/98 WITH KBE = 64.9' A.M.S.L. THIS WELL KICKS OFF FROM MPH-08 AT 8588'MD, 3899'TVD. ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 6. MWD RUNS 1-2 REPRESENT WELL MPH-08A PB1 WITH API#: 50-029-22808-70. THIS WELL REACHED A TOTAL DEPTH OF ll091'MD, 4162'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service.name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 8566.0 11039.0 RPX 8580.5 11046.0 RPS 8580.5 8941.5 RPM 8580.5 11046.0 RPD 8580.5 11046.0 FET 8580.5 11046.0 ROP 8618.5 11092.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 8566.0 8569.0 8575.0 8580.0 8581.5 11092.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: GR 8565.0 8567.5 8573.5 8577.5 8580.5 11091.0 BIT RUN NO MERGE TOP MERGE BASE 200 8565.0 11091.0 MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX 'MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Service Unit Min Max Mean Nsam DEPT FT 8566 11092 9829 5053 RO? MWD FT/H 3.36 306.18 88.8155 4948 GR MWD API 32.83 120.42 86.1811 4947 RPX MWD OHMM 0.12 1760.17 18.1915 4932 RPS MWD OHMM 0.06 1760.18 15.4246 723 RPM MWD OHMM 1.7 1971.75 26.7873 4932 RPD MWD OHMM 1.24 1825.44 29.6734 4932 FET MWD HOUR 0.3239 11.031 1.40311 4932 First Reading 8566 8618.5 8566 8580.5 8580.5 8580.5 8580.5 8580.5 Last Reading 11092 11092 11039 11046 8941.5 11046 11046 11046 First Reading For Entire File .......... 8566 Last Reading For Entire File ........... 11092 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8565.0 11038.0 RPX 8578.0 11045.0 RPS 8578.0 8940.5 RPM 8578.0 11045.0 RPD 8578.0 11045.0 FET 8578.0 11045.0 ROP 8617.5 11091.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 04-JAN-00 Insite 6.45 MEMORY 11091.0 8565.0 11091.0 45.2 77.5 TOOL NUMBER PB1349GRV4 PB1349GRV4 6.000 8588.0 Water Based 9.10 48.0 8.4 27000 3.6 .170 70.0 MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 .124 .160 .200 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 RPX MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPM MWD 2 OHMM 4 1 68 20 6 RPD MWD 2 OHMM 4 1 68 24 7 FET MWD 2 HOUR 4 1 68 28 8 98.1 70.0 70.0 Name Service Unit DEPT FT ROP MWD 2 FT/H GR MWD 2 API RPX MWD 2 OHMM RPS MWD 2' OHMM RPM MWD 2 OHMM RPD MWD 2 OHMM FET MWD 2 HOUR Min Max 8565 11091 3.36 306.18 32.83 120.42 0.12 1760.17 0.06 1760.18 1.39 1971.75 1.24 1825.44 0.3239 11.031 Mean Nsam 9828 5053 88.8155 4948 86.1973 4947 18.181 4935 15.3657 726 26.9092 4935 30.643 4935 1.40297 4935 First Reading 8565 8617.5 8565 8578 8578 8578 8578 8578 Last Reading 11091 11091 11038 11045 8940.5 11045 11045 11045 First Reading For Entire File .......... 8565 Last Reading For Entire File ........... 11091 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/02/15 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF ~Tape Trailer Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 00/02/15 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File