Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout171-037PLUGGING & LOCATION CLEARANCE REPORT
State of Alaska
.ALASKA OIL & GAS CONSERVATION COMMISSION
-.
v~o No. 7 t-0057 ,
Lease
Memorandum To File': API No.
Operat°r
'Location
Spud: lZfSS/'t'! ,
Abnd Date
Note casing size, wt, depth, cmt vol, & procedure.
Long Csg:
Liner:
Perf intervals - tops:
Review the well file, and comment on plugging, well head
status, and location clearance- provide loc. clear, code.
Well head Cut off:
Marker post or plate:
Location Clearance:
Conclusions:
Code
Signed
Date
December 9, 1980
Mr. -Robert A. Ballog
Area Paleontologist
Union Oil Company of California
P.O. Box 6176
Ventura, California 93003
Re: Preparation of Palynologic/kerogen
slides from well samples and cores
in the state library collection.
Dear Bob:" ~ ......
Pursuant to our November 20, 1980 discussion, permission is
hereby granted to Union Oil Company of California to extract a
maximum 1 cc. of sample material per sample envelope or 1 cc.
of core material per foot of core from the State's set of
samples and cores for the sole purpose of preparing palynologic
and kerogen Slides within the designated intervals in the
following wells, subject to the conditions set forth below:
Sample
Set No.
179
167
260
311
188
139
162
110
203
164
Wel 1
SOCAL Lewis River #13-2
ARCO Middle River Unit #1
Texaco Nicolai Cr. Unit ~4
Texaco Long Lake Unit 81
Cherryville Middle River
Unit # 2
Shell Cottonwood Cr. St. #1
Shell Kustatan Ridge 81
Shell Middle River St. #1
Pan Am Bachatna Cr. S~. ~1
Mobil Tower #2
Interval
20' - 11,625'
(including cores)
0' - 10,586'
(including cores)
310' - 12,744'
365' - 11,097'
2112' - 8,267'
42' - 4,245'
(including cores)
30' - 6,718'
110' - 5,277'
(including cores)
60' - 6,320'
1180' - 12,060'
Mr. 3{obert~, ~.~l log
'union Oil ~_. California
-2-
__~ecember 9, 1980
CONDITIONS
1) Cuts of the sample and/or core material from the State
collection are to be extracted only from those indivi-
dual envelopes or bags in which total content of
cuttings or core material is greater than 10 cc. (No
cuts are to be extracted if the volume of material in
the individual envelope is less then 10 cc.)
2) Union will proVide the State with a list of the speci-
fic sample and core footages from which material was
extracted.
3) One standard set and one screened set of palynologic
slides and one set of kerogen slides are. to be pre-
pared for each well.
4) Each group of slides is to be received by the Commis-
· sion within approximately 90 days from the time the
material was cut from the Commission sample library.
5) All residue and excess material is to be returned to
the Commission.
6) All slides are to be transmitted direct to the Commis-
sion and not examined by outside parties.
7) Petrographic or other thin sections are not to be
prepared without specific consent from the commission.
8) ~Uni'on~'Sha~l bear all costs entailed.
We. are ~leased to work with you in this beneficial project and
look forward to your company's continued exercise of care and
good judgement in the handling of this limited quantity of well
material. I knew we both understand that the State's well
sample library is public property and that granting' Union
permission to extract portions of material from this library
for the purpose of preparing the. indicated slides enhances the
value of the library and is in the public interest.
Very truly yours,
William Van Alen
Petroleum Geologist
cc: Craig K. White
Union Oil Company of California
P.O. Box 6247
Anchorage, Alaska 99502
WVA = mm ~
02-001B
~TATE
. 'et ALASKA
TO: ~
FROM:
t)EP'/,d~~ OF NATAL RE~ES
Dl¥151~ OF OIL
DATE : F~I~I,11'~ 29, 1972
SUBJECT:
Field Trip - Abandoned ~el I
Locatto. laSl~ctlon of Union-
~aa C,relk Un I t
t, 3, tl~17.
i
~~rY.~__~,.....1972 :, ! ~.~ for l~st Forelaad by company
- hl:a ~t,,e ~tl~k-rlt~ at 9:i5 A.14. with Ek~ lllerden and Ben
Talley, L~t.~ 0ti of Callforala per-am~el In cha~ of drllting operations
t.n Ae A Inlet &rea. The purpose of the trip wa~ to ~ake final abandoned
well Iota- tt~ l~luas of U~l~-Bacbet~a Creek Unit ~rs I, 3, and
JJe laaded at Se ~est Forelaad airstrip a~d were met by a Union c~c*e~d
~lt~ter f~ ~t F~et~. ~ felt t~iafely ~ ~ lns~l~ trip.
~ ft'~ ~r t~ off-t--dl~ site at ~t F~lend ~ ~e house t~l lacs,
drl!'ll~ rig, .~~ ~ui~t ~ supplies f~.the c~al ~ ~d ~ell
l:~t~ ~ ~ ~- Ail this ~uf-~f-will be ~~d ,o ~al
r~t s~. ~ f!~ ~ r,d, vhi~ m In e~llent m~ltt~, ~
~t~:~s ~~ t~ of a Iw ~III, c~tralty t~t~ ~ ~e original seven
pro~ ~itll~ i~att~s, ~Is ~ bad b~, ~ in the past by Shell
Oil ~y. ~-Tatl~ ~tl~ ~t ~fore ~lng to this site they
~led out ~~ el~ 55 ~tI~ dr~ ~ich h~ ~n left by Shell 011
~. T~ ~ st~ ~ b~ pt~ aft~ e~~.tng was ~ved a~ay
' : , ~bl~ ~-~. ~ e~tal~d ~t the.s~ b~ wes push
. .' -~ ~ ~ t;'~ sl~ th~ it ~~ s.~ ~ d~rls ~ buried,
:--:-.::~ bef~e ~ ~tlt-~ ~ui-~ was ~a~ ~ ~ off-I~dlng a~. See
~ left*~ cm~l ~ sl~ ~d fte~ ~e t7 mtles of Ice ~ad ~ fha ~s*
-~Stant ~il, ~-. 7. ~ ~d ~s laid ~t tn a ~n~rlng pattern In order
~ :mlss ~ a~s ~ ~o give t~ ~ ~~ra~ as *he cr~ and
..~~ In ~bls v'Icl~l~. Pa~s of *he ~ ~ ~ere ~tfted ~lth s~
"d~id ba~ ~ls ~.I-~ eff~ In ~ confrasf"~ ~ s~algh* sel~lc
i~a~!mq. *~ ~t ~*ly drlited ~ell. This. I~*1~ had b~ ~l~n clean
'a.,tn cam ~ .~,~ all ~e~ I~-~ and".pu* fh~ In ~e ch~r. The
~II pl* ~d ~a ~~ ~ ~ ~d a~alnSt ~und set*l lng la*er on.
-: :~ ~~ ~tl ~~r ~s I/4" s*~l plate ~!~ ~e required tnfor~tlon
'~ In~ it, ~ pta~e ~ ~1~ to ~e s,~l p.l'~ ~hlch ~as welded ~
~;.:~': :.::'.. :'~ '~t.t ~t~ ~ ~* [~o ~e ~nf ~sl~ s~J~e plug. The aband~ed
~ :: ;:::": '~ll ~~ ~ at I *~ l~ti~s ~e ~s,~,ed a~ se, the ~. ~
~t. we fla~ ~ross country fo Bachatna Creek Unit No. I. This location was
located In small to medium size timber. The location was cleaned~then the
Homer' Lo f~trr~tl
-2-
February 29, 1972
original trees ~are laid In a random ~anner over the slte to give it a ~ore
Ratural ap~~e ~d ~ l~lblt e~sl~. T'~ site was le~l ~pt ~ the
s~tt pit vhl~ ~ ~n~ o~. T~ aba~ veil ~r~r was similar to
~ ~rker at ~1t ~ 7. ~ ~o 15.
~e fte~ fre~ tlell No, i ~ Bac~atna Greek Unlt ~. 3. Thls I~tlon ~s ve~
similar ~ ~ p~l~s 1~t~., It ts I~a*ed In the ~s
tiar ~ ~la~ l'a a ~~ ~ as at ~tl No. 1. The t~dlo~
levied ~t ~ ~ ~It plt ~tch las ~u~d over. T~ ~ell'
was stmttar ~ ~o~r ~ ~ils. ~ ~oto ~6. The ~ll~ter was
~nn~ ~ I~ on f~l Pa ~ ~ flew c~ss ~nt~ b~k to
F~t~
-tle left la~ltatel¥ for ~ via the ~in e~glne Beechcraft. ~n Tal Icy
~~'~ ~tlot ~ fly i~ ~ sl~ al~ ~ 16" ~sln~ ~s
rt~~-~ ~ ~ F~I~ a~ ~nlte ~lnt. App~l~tety the first
~tf of ~ pl~tt.~: I~th e ~ld~ ~ buried, exc~t for str~ ~ssl~s.
~t ~-miles of pt~ at ~ ~h ~ r~i~ ~ be ~t~d. F~r
cr~l~ and f~r r~ c~ssings still ~ ~ be Instal I~.
p-~r~si~ ~ ?~ ~l~, ~ fi~l ~ mtl~ of ~lding, and pipeline
burial .~ ~ fl~ al~ ~e pl~ti~ rl~t~ay. ~ pas~d
a~t 127~5 P.~. t ~ ~ field I~to~ ~~s f~ the
appr~i~ fleet tn~t~ f~ t~ a~~ I~att~s. I ~ve
of ~ ~~ ~ ~ lalley ~ re?ai.~d ~ ~y ot ~ a~ached~ for
our r~ds.
^tfach~e~ts
. SatiS~acto~ .' Item-::-.? ~. "/:' ':?-:., '" ~-'---.:?'~. 'i~::- "SatiSfaCto~ · It~:~ ,~:. ':.-.~ ·
.-" (:~) :/::':' ;;(. ')::~ 1, .~ell' STP':-":_''~ .'~'~ '. ":-~:.',.':':~?.~.':.~?' ( ::)' ..' ( )'". , 11, ~ ~ifold Pressure
(:.) . . ( ) 2. Safety ValVes-FloOr:, ;:: -.:;~::, ... (.) ~'-,~ .¥'. ;( ) 12. ~P Preaau~e Test ....
· ('.) () 3. Safety-Valves-~eIX~?~.'--''~ (-) (.)' 13. Rese~ePi~
('.) ( )' 4. Safety~Valves-SubSu~face:- ~' ~'~-( ) 14. Pi~
~P CloSin~ SYs~a~-::'-'?'~:~' '-> '"'(). <.-~'-( )' 15. Location:
6, .Remote Controls
?. Drtlltnt Spool,ou
8. Flow Lines
9. Kill Lines
10, Manifold Chokes
:lets
() (). 16.
() () 17.
(>9 ( ) 18.
(~:) ( ) 19.
() () 20.
Fuel Berm
Operations off "Pad"
"general Housekeeping"
Abd. Marker in place
Water Well covered
Il
P,.:.,_.ARO,D LAND PHOTOGRAPH
AN ORIGINAL
:
,
lo ~3
AN ORIGINAL POLAROIDe LAND PHOTOGRAPH
For you-r r. oN'vepJence
when ordering co~ies,
indica~.e the number of
copies desired i.q the
appropri~.te box :or the
size(s) you select.
P558A-1 .5/70
REGULAR SIZE COPIES __
WALLET SIZE COPIES__
5 x 7 ENLARGEMENTS __
8 x ]0 ENLARGEMENTS ___
I
35mm SLIDES__
Printed in U.S,A,
:, .,. -.. ::...!.., :.: :_ J
Z: ''-['? -'¥ .~ .....
2/2/72
To Mr. John Leverson ';ROM
Division O£ 0il & Gas Harry C. Lee
AT AT
State of Alaska Southern Alaska District
TELEPHONE NO.
TRANSMITTING THE FOLLOWING:
) ,
1 Sepia and Blueline of the
followin~ on Bachatna Creek ~o. 1
2" & .5" DTI,-T,T,8
2" & 5" SNP
2" & 5" FDC
2" & 5" Sonic
2" Mudlog ~--'~'
1 Set of Dry Samples.
PLEASE CONSIDER ALL SUBMITTE! DATA
CONF I DENT IAL
FORM 369 {REV 2/70) PRINTED IN U,$.A.
REV. n ~n_~o : ~.- Slabrnit "Intentions" in Triplicate ~
....... I
OIL AND GAS CONSERV ¢ ~ 50-133-20234 ]"3 ENd'S' ~
SUN~Y NOTICES AND REPORTS ~~~,¢ ~ ~ .~ .......
~ion 0il Co~y of C~li[o~i~ ~~~eek Unit ['
3. ADD~ESS OF OPE'RATO~ ........
909 ~est 9th Avenue, ~orage, ~~ 99501 No. 1
~'. LOCATZON 'OF W~L ' ' ' t0. F~ ~D ~O~L, OR
FILE:
~, ~,"~ Sin'S 6 11~5'~ from ~ co.er ~a~a~a Creek -
Section ~1, T8N, ~6W, ~. n. s~c., ~., ~.. ~., ~o~u ~o~
O~E~IVE}
Sec. 21, T8N, ~6W,
"~3. ELEVATtONS (Show whether DF, RT, GR, etc. ~12. P~T ~O.
11 ft' ground to RT 71-57
, ,
24. Check Appropriate Box To indicate Niat'ure of NOtice, Re ~ort, or Other Dwta
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF I
FRACTURE TREAT l/
SHOOT OR ACIDIZE
REPAIR WELL CHANOE PLANIg
SUBSEQUENT RBPORT OF:
MULTIPLE COMPI,ETE FRACTURE TREATMENT i~ ALTIIRINO CASINO
ABANDON* ~ SHOOTINO OR ACIDIZINO i~' ABANDONMENT* ~
(No~E: Report results of multiple completion on Well
~Other) ~ ~ Completion or Recomplet[on R~port and Log form.)
.,, ~
15 D~:S~a~BE I'aOPOS~D OR COMPLg~gD OPeRaTION8 (Clearl7 ~tat~ all p~rttnent detall~, and giro pertln~nt d~t~, ~neludln~ ~tlm~ted d~t~ of ~t~rttn~ any
~ropo~ed work.
Drove 13-3/8" K-SS 54.5# csg to 340'. Instld ~ tested ~OPE Drld 12-1/4" hole to 740'.Ran
9-5/8'" 728' K-55 40# buttress csg, cmtd to surface w/270 sx Cl~s "G" cmt. 95 cu.ft.of
good ~nt returns to surface. Installed ~ tested BOPF.. Drld 8-1/2" hole 728' to 3083'.
~an Schlumberger DIL, SNP, density, HRD, sonic ~ sidewall saw, let.
Abandoned well w/plugs as follows- (Permission to plug and abandon rec'd from O.K. Gilbreth
State of Alaska, Division of Oil ~ Gas, by telephone on 1/2/72.)
Vertical 6 Measured Depth Lin. Ft.
-- 29~0"-2720' ....... ~
2550'-2550' 200'
800'-500' 300'
200'-100' 100'
10'-S' 5'
7s~ FEB2 I97Z
110
4O
5 DIVISION OF OIL AND GA5
Eight ft. x 5-1/Z" pipe dry hole marker w/ 1' x 2' x 1/4" plaque welded at right angles
w/pipe to 1/2" plate in turn welded to 9-5/8" csg stub.
CIP Last plug~
- abandonment
well plugged an~ aband°ne7
~6. I hereby certify th //~ /~f ' ~ J t . ~ ,
SIGNED
,,,..,..,o. vu ? '
CONDITIONS OF APPROVAL, IF :
1:00 am 1/4/72, R_ig Re!easea at !Zm...dnight ..1._./..4./7.2, and
DAT~ 1/5/72
DATE
Po~ No.
STATE OF ALASKA
OIL AND GAS CONSERVATION
MONTHLY REPORT
AND WORKOVER
l,
o,,. [] °'"
W~LL WELL OTHg~
2. NAME OF OP]~A. TOR
Union Oil
3. ADI~RESS OF OPERATOR
909 West 9th Avenue
4. lOCATION OF WEJ-J~
Alaska
~, API NUA~ERICAL CODE
50-133-20234
6. LF_~SE DESIGNA~ON AND S~IAL NO.
ADL 46958
7, IF INDIAN, AL~DT/-EE OR TRIBE NAME
8. I/NIT FARM OR LEASE N;~ME
Bach&rna Creek Unit
9. WELL
Number 1
99501
813'S & ll3S'W from N?~ corner Section 21
T8N, R16W,
10. FIEI2D ~ND POOL. OR WILDCAT
Badmtna Creek - Wildcat
11. SEC., T., R., I~{., (BOTTOM HOLE
os.mc-rrn~
Sec. 21, T8N, R16W, SH.
1~-, PERMIT NO.
71-57
13. REPORT TOTAL DEP~3-I AT END OF MON/'H, CI-I~NGIkS IN HOLE SIZE, CASING AND CE1VIF_~TING JOBS INCLUDING DEPTH
SET A3XrD VOLUI~ USED, PF-A~FO~TIONS. TF. STS ~ I~ESULTS. FISHING JOBS, JIJNK IN HOLE JKND SIDE-/q~CKED HOLE
AND P~Ny OTHER SIGNIFICANT CI-I-ANGES IN HOLIi: CONT)ITIONS.
BAC!iATNA GREEK BNI.T_ #1, danuar7 1972
continued drlg 8-1/2" hole from 2719' to 3083'TD. I(m~ Sd~lumberger DIL, GR-Pensity,
SNP, sonic log & dip meter. Shot 41 sidewall samples. RI w/oedp. Plugged 8-1/2"
open hole from 2920'-2720' with 75 sx Class "G" cmt. Pull to 2550'. Plugged 2550'-
2350' with 75 sx Class "G" cmt. Layed down dp. Plugged across 9-5/8" shoe from
800' to 500' with 110 sx Class "G" cmt. Plugged 9-5/8" csg from 200' to 100' with
40 sx Class "G" cmt. CIP of last plug 1:00 am~ 1/4/72. Removed BOE. Removed 10"
3000# csg head. Installgd'~' sx top cmt plug 10""'t~'"5'. Welded 1/2" steel plate
on csg stub with drThole marker installed.
h%LL Ai~qDONED and RIG RELEASED fia Bachatna Creek Unit #1 to Bachatna Creek Unit #3
at 12:00 Ni~ight 1/4272.
'with the Division of Minims & Miner~l/s by the 15th of the succeeding month, unless otherwise directed.
· ' ~ SUBMIT IN ~ :ATE*
L ~,~% ~E~ STATE OF ALASKA
structions on ~. API N~C~ CODE
ONSERvATION COMMITTEE reverse side,
50-133-20234
WELL cOMp ~N REPORT AND LOG* ,.~~x~o~~~o.
' ~L 46938
OVER ~ ENDEEP' BACK ~ 8. UNIT,F~ OR L~SE NAME
~VELI,
~. ~.~,~ o. o~.~o~ ' [.~ ~~ I~~ Ba~atna Creek Unit
~ion 0il Co~~ of Cali/onia ~ ~. w~o.
909 ~est 9th Avenue~ ~chorage~ ~ka 99501
4. l. oc~rIox or w~n~ (Re~ort location clearlp and in accordance wit~ a~y Crate requirements)*
xt~uaac~815~S ~ 1155~ ~ ~ co.er ~c. 21, TSN~ ~6~ ~. n. ssc.,r..~..~..(.o~o~o~,
OME~IVE)
At top prod. interval reported below --
~c.
xt total dep~ S~e ~ surface -- vertical hole '~. ~r~o.
71-57
12/2S/71 t 1/2/72 } 1/4/72 ~ Gromd to RT - 11' I 30'
~S. '~OTXL DE.H, ~ & TVDg9. PLUG, ~K MD & ~D~. ~ ~LT~LE CO~L., [ 21. ' '(N'~ERVALS DRI'LLED BY"
.... l ..... [ [ ~OW ~Y* { ROTARY TOOLS ' ' I' CABLE TOOLS
/ 5, m I -- a a t --
None -- P i A [~ ~ I vertical
hole
24. T~E E~CTRIC AND OTH~ LOGS ~UN I k~ /i I~,l
.DIL, SNP, Sonic,, 6?~i~ ~ SWS. ,. _ ....... ,a: ,~. ~.~r, 5A~i · ,
~' CAS~G RE~ (Report all strings set in well~lVI3l~ ~l ~"
'13-3/~" ' 54.S~" ~ / J-55 'l '340; 1 driven none - drive~ to'rof--~l none
none . . hOBO .. .
~. ~o~.~-~o~s oe~ ~o ~o~o~" d~w~. ,i~e a~a ~.,~e~) Z,. -' " , ' " ~t PIU~S
D~I INT~V~ (MD) AMOUNC C~D KIND OF MAI~P~AL US~
2920-2720 75 sx "G" ~t
none 2550-2350 75 sx "G"
, 800-500 110 sx "G" ~t
200-100 40 sx "G"
~o. ~~ 10-5 5 sx "G" ~t
DATg O~ TIST, [EOURS TEiT~ ' [CItOK~:~ ['~P. QD'I~ ~6,R'~ ~i~BDL. '~.%~F. WA'i'E~BBL. [ GAS;OIL ~.~TIO
'-' . I il ''- .... ~I /;' ~; ~%'1' ": -'- ';:;~ ~.~'r~ Ii --- i --- I ---
31. DisPosiTION OF GAS (Sold used for el vented etc.) ~'" ~f ,(~' ~ ,~' ,';:" / [TEST WITNESSED ~Y
%,, ff 2'W ,'~ /V
32. LiST OF ~TTACHMENTS ~ ~;~ ,~' f/' ~,}' ~/
~ ~,,/3:':~; .t ,4/ . ·
--- ~' '~;,
attached intormatlon ~s Complete and correct ~ determined frd~
33. I hereby certify ~Zhe forgg~ng[l~
?. IF INDIA-N, ALLOTTEE OR TRIBE NANIE
10. FLEI.,D A24D POOL, OR WILDCAT
Bachatma Creek - Wildcat
INSTRUCTIONS
General: Th~s form is designed fop submitting a complete and correct well complet,on report and log on
all types of lanJs and leases ~n Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
merits g~ven ~n ether si)aces on this fo~ and
Items 20, tnd 22:: If this well is completed for separate prc'd~ction from more than one ~r~terval zone
(multiple completion), so state ,n item 20. and in item 22 show the p~cJuc,n9 interval, or ~ntervals,
top(s), bottom(s) and name (s) (if any) for only the inter¥,~: reported in ~Tem 30. Submit a separale report
(page) on this form, adequately identified, for each adrifT,gnat interval to be seperately produce.J, show-
ing the ackiitional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
,,
~'~. suMM'Ap.y OF FORMATION TE~'I'S 1N('I.UI)IN(;' IN'I:~RVAL TKSTED. PRE~URE DATA ~~VE~I~ OF OIL. GAS,
~. G~G~C M~K~
WA~ AND MUD
NAME
MEAS.
~0~
Top Tyonek 850
Top ~est Forel~ 2640~ 2640
Top Jurrassic 298S
al. COnE DATA~ A'I*I'ACI[ BRIEF D~C~.IP[~()N8 OF LITItOLOGY. PoROSiTY, FRAC~RES. APP~NT DIPS
AND D~I~C~'EI) S'tlOWS OF OIL, GAS
~oHe ....
,~_
U~,~].
· WELl_ [~E r~ ,~t~k ,,.,~ PAGE biO. _
.............. ~~25/71 COMP D~TE 1/4/72f,,~AS~ ¢~LL NO._.
ylnr,D gad~atna Creek Field - Wildca~c~~ACTOR Sm~ta ~e_ br~g
L~ATION al3'S ~ 1135'~ fr~~~E-0NIT ~p~~'ortable
~-,' ........... L ~.'---~~... '" ~~W~~. ~~Ts: ' -
PEIiMI~'NO:~S~I~&~'~:~C740958 GSo'~u ~~' ~levatio~~ '30'
~~0~{ (B H L ) Verti~ ti°lc ' B.T. I OD!~,L.
................ ~FW ~ .......
- SIZC : WEIGHT THREAD
~78" 5~i'g ~d~ K-SS 340' ~ld ~'driven to ref-~l - no ont.
4O
buttress
K-SS
728'
Gmtd w/270 sx. tiad 95 cu.~. returns to surf.
PERFORATII,IG RECORD
~_D~Tlg "' .IILTF VAL '. ,_=D I , . P~IESENT CONDITLQ_i'{ .....
'i/4/72. ' ....... i .... ii'ell .Aband~'xed.w/plu~s a:; ~follows: . -" .... · ..." .. ..
'interval 'Lin: Ft [ ~ Sx ont. ' .....
........ 292'0-.2720 200 .... 75 sx
---- ' '2550-2350.' ' ' 200 ' 75 sx
.... 800"500 500- ' ' 110 sx ·
.
.... ' 200-100._ . 100 40 sx
·
10-S 5 ' ' 'b' SX .....
·
............ ttole left s'mriding frill c)f 70/77~ cu.ft, clay,. ' _
........ lignosull~ho:mte mud duri~xg and foflowing
............ abandomnent: In~tld welcle'd' 1/2" plate' on .......
. . .... ........... 9,5/8"' 'csg ~,tub with .3-1,~2"...X 8' dry liole .... . ....
marker.. .
· ,
,_ n, , .~:m~,,,~. .~
INITIAL PIRODUCTION
__~ATE IItTE_RVA~ NET OIL CUT
, ,
....
·
· ,,PLA .... I .........
·
-.
WELL
TYPE: "
CASING HEAD: Cameron 3000# cgmpact unit head w/9-5/8"' & 7" csg prep & tbgprbp'
·
CASING HANGER' Removed - replaced w/dry h61e marker. No wellhead' re~naining. Dry hole marker --
'-~ 5:1/2" x 8' with: . Union Oil Con~apy of .California - Bachatna Creek Unit #1
CASING SPOOL: NE 1/4, Sec. 21, 'T8N, R16W, ~X,l. ..
TUBING HEAD:
TUBING tIANGER:~
TUBING tIEAD TOP'
MASTER VAf. VES:__
CItRISTMAS 'I'RI.~E TOP
~ .... OIL CO, OF CALl NIA SH~-E:T B
~ MUD RECORD- PAGE NO._ 2
.
Bactmina Creek Unit' ~1 ' FIELD Bachatna' Creei
,EAS~ ElaT. Li~mosu~honate " WELB'NO i .
,~p~_ . .... ms~amu~oa~_ IMC prig ~Md;, I,~c.
i2/26 740' 75/75 50 19:g ...40ppm - "'
--2~ 1125' 75 40 ....... .:~0 [0~5 .3300 " .i/2. '"i5.... ' '
28 18i9' .... 75 45 15.6 [0.0 1850 I 1/2 15 '
J 29 256~I' f 76' 4.~'. 6.2 '[0.5 1800 ..... 1/4 i5 '" .' '.' .... "
,,
- 50 2499' '76 46 ' 4-~6 10.5 ~ 2000- 1/4 15 ....
- $5 '2719' 76... 4~o' $.6 ' .[0,5 -2o,,0o I I ,i,1/4 13. ", .........
'1/1 3.044' 76 48 3.6 [0.5- 2000 , 1/4 12
,._'2 3083' 76 "'1'46 3.61..~L0.5 2000 1/4 ,i'Y2 .... wU ai~,.~98~'; 1/2/,~2 "
·
I
·
, , .. ,
_
·
..
·
·
.....................
·
·
·
I
·
·
·
·
,,
·
.
·
......... ................ . ......... ,
·
·
..
· ·
,
i · -
·
·
,,
· ,
·
...... . ...... , , , ,, ,,
·
·
·
I
·
·
, , · ,, ~. * , q , ~,, ~. , . ., , ,,, , , ,, ·
I
.
.
....-' "'
· DIVISION OF 611
..,
'1 j - -- -- _ J , _=-- , , _-- ~ _ L
·
_
_
, . _. ~ - _ ._~~ ......... ,,. :-__ ,. ·
· .
·
UNION OIL CO. OF CALIFOrNiA
DRILLING RECORD
SHEET D
PAGE NO. ~ 51 ,
LEASE Bachatna Creek Unit
WELL NO. 1
FIELD Bachatna .Creek
DATE
11/6/71
12/13/71
12/13/71
14
2O
21
25
26
27
28
29
E. T. D.
340 '
340 '
740'
740'
1246'
1819 '
2361 '
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
Conm~enced barge movement of co]mtruction equipment across Inlet for
Bachatna Creek drilling project on 11/6/71. Offloaded at West Foreland
site. Conmenced offloading ramp construction 11/10/71. Built rmip,
staging area, ~ road to camp site on bluff overlooking Kustatan River.
COn,hence barging of project equipment & supplies 11/17/71. Completed
barging operation 11/27/71. Built camp & ice bridge across Kustatan
River. Crossed river 12/5/71. Built wintertime ice road, runway, ~
location #1. Completed roads ~ location 12/13/71.
bloved in Alaska Diamond Drill and drlg rig and equipment, onto BCU
location #1. RU.
Drove 13-3/8" K-55 54.5# 8rd csg to 340', point of refusal w/31,000#
hanmer. Csg encountered clay at 310'. Moved out. Worked days only.
Swan~ very. soft to 310'.
Ymtted location, built cellar, started rigging up Santa Fe Drlg Co.,
rig #35.
RU, instld 12" 900 Series hydril BOP w/choke and kill assembly on 13-3/8"
conductor. Set tanks, PU da. RIH to 290' ~ circ. Prep to spud.
Santa Fe. Drlg. Co._ SPUDD ~tiD 12:01 am 12/25/71 (Merry Christmas) II!
Drld 12-1/4" hole' to-740'. FixC~ssive amts of clay (gray) plugging flow
pipe. Circ hole clean. Ran 18 its 9-S/8" 40# K-SS buttress csg as
follows:
18 jts csg w/Howco guide shoe on jt #1 715.37' .
Landing jr., below RT 12.40'
Total Csg, RT to shoe
Qntd csg w/270 sx Class "G" cmt mixed w/80OF fresh water.to a 118# cu.ft.
slurry. Last 1S0 sx mixed, w/2% CaC12 & 80OF fresh water. Disp plug w/292
cai.ft, mud, to within 40 lin ft. of §hoe. Bled off -- float ok. }tad 95
cu.ft, cmt returns to surface. CIP 9:30 pm 12/25/71. Employed slo-flo
cmtng method. CO cellar. Washed- out conduht0¥ (hen-tralizers instld on
collars of j ts #1 and # Z).
Removed hydril ~ landing jr. Instld Cameron 10" 3000# compact unit head
on 9-5/8" stub (male.:: thread). 13-3/8" cut off ~ st:apped to 9-5/8" to
prevent movement. Installed choke and kill lines, all accumulator lines
and controls. Now installing BOPs -- unit head, 10" 900 x 10" 900 spool,
double 10" 3000# hydraulic Fflaaffer ~ hydril GK. Prep to test BOP's.
Tstd BOP's, choke & kill lines. Drld firm cmt from 687' to 727' (shoe).
Conditioned mud-fOr a 10 cc water loss. Drld 8-1/2" hole from 740' to
1246'. POll for bit d~ange.
Drld 8-1/2" hole 1246' to 1819'. Poll for bit chng. Hole tight & swabbing.
Circ three times to pull 8 doubles. Now POH. Lrg amts of blue-gray clay.
POH w/bit #3. RIH w/bit #4. Drld 8-1/2" hole 1819' to 2361'.
FEB2 197
DIVISION OF OIL AND GAS
A~ ..-,:"l,.. -..kG
UNION OIL CO. OF CALIFORNIA
DRILLING RECORD
SHEET D
PAGE NO. 4
LEASE_ bachatna Creek Unit
WELL NO. 1 FIELD Bachatna Creek
DATE
12/30/71
31
1/1/72
E. T. D.
2499'
2719'
3044'
3083'
3083'
plug tops
2720'
2350 '
$00'
3083 '
plug top
100 '
5'
DETAILS OF OPERATIONS, DESCRIJ=TiONS & RESULTS
Orld 8-1/2" hole to 2415'. POt! for bit cling. Drld 8-1/2" hole to 2499'.
POti for bit chng. Eadl trip swabbing hole due to clay ~ coal.
RI}t w/bit #6. Drld 8-1/2" hole 2499' to 2702'. POll for bit drag. RI
w/bit #7. Drld 8-1/2" hole 2702' to 2719'. Now drlg. Ilole tight first
3 stds off btm due to clay ~ coal.
Drld 8-1/2" hole from 2719' to 2856'. POll w/bit #7. Rlll w/bit #8. Drld
8-1/2" hole from 2856' to 3002'. blade short 5 stmld bit trip. llole
tight for 4 stands. Drld 8-1/2" hole from 3002' to 3044'.
Drld 8-1/2" hole from 3044' to 3083'TD. Circ btms up. POll. RU Schlumberger.
Ran DIL, density and SNP. Now logging. Sd~lumberger fnd bottom at 3078'.
Ran sonic log, Hrd and shot 41 sidewalls. RD Schlmnberger. Layed down
drill collars. Rill w/oedp at 2920'. -Laid 75 sx - 118# "G" cmt abandonment
p~l..ug_fron ~2920' to 2720'. Pulled oed~'-to 2Sbu~. Laid ?5"sx"lfS# ,,~,t cmt
abandonment plug from 2550' to 2550'. Laid 'do~m ~p. 'P~lied t0-'800'.' Laid .
-110 s~ ~-~onment plug-i18# ,-,~-i-~ ~{{ fr-~ 8-~i .t-0 S00J~- Laid 'dcwn dp.' '
No.~e: Oipmet~i indicates"0""%o 1" hole angle to 'I'D.
Laid down dp to 200'. Laid in 40 sx --- 18# "G" cmt abandormmnt plug from
200' to 100'. CIP last abandomnent plug 1:00 am 1/4/72. Laid in top 5 sack
plug from 10' to 5'. Removed BOP's & cs~ h~ad~ Instldsteel p~te'
welded on 9 "
[ .' )- - -5/8 & installed dry hole marker. Dry hole marker 3-1/2"
tbg x 8' long welded to pla~over 9-5/8" stub. b{arker reads as follows:
Union Oil Company of California
Bachatna Creek Unit #1'
NE 1/4, Sec. 21, TSN, R16W, Rd.
Rigged down. Prep to move out. RIG P~LEASED for move to Bachatna Creek
Unit #3 at 12':00 Midnight 1/4/72.
11 days from spud to rig down and move out.
l~days from rig up to spud.
days total well w/Santa Fe rig.
8 days - Alaska Diamond Drill w/conductor
(Rig up and conductor days not 24 hr days).
DIVISION OF OIL AND GAS
OIL AND GAS CONSERVATION ~I~E/:,~% :~: ::' ':.~, ,.:!.~::;.~ 50-133-20234
AND WORKOVER OPERATIONS ~<~?' ~'~ ~ ~,
.... o,,,, .--, ,,t
Union 0il Co, my of California ]~ ' ,,,,~ ~ Ba~at~~eek
909 W. 9~ Avenue, ~chorage, Al~ka ~1 No. I '~-~
DNi5~O~>,.~ .... . ~ .... Ba~atna Creek - Wi td~ats~c '~ ....
813'S E 1135'W from N~ co.er ~ction 21; '~rSN, .,n,s~c..t..~.,~Lmo~o~.oU:co?.~F~?.:
~6W, ~. o~~
Sec. 21
12. P~IT
71-37
_
,, ,, ,
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING Al~q) CE1VIENTING JOBS INCLUDING DEPTH
SET AND VOLUiVIES USED, PF~P~FO.I~-~TIONS, T'F~STS AND RESULTS, FISHING JOB~, JUNK IN HOLE A~D SIDE-TRACKED HOLE
~ND ;dXIY O~R SIGNIFIC~NT Cq-'-~NGES IN HOI~ CONDITIONS.
December 1971
Con~aenced barge movement of construction equipment across Inlet for Bachatna Creek
drilling project on 11/6/71. Started off-loading ramp construction 11/10/71. Built
off-loading ramp, staging area, and road to camp site on bluff overlooking Kustatan
River. Commenced barge of equipment and supplies 11/17/71. Completed barging 11/27/71.
Built camp and ice bridge across Kustatan River. Completed river crossing 12/5/71.
Constructed wintertime roads and Bachatna Creek #1 drilling location. Completed
12/15/71. Moved Alaska Diamond Drill on location 12/14/71. Drove 15-5/8" 54.5# J-55
8rd csg to 540' as conductor. Built cellar and conmenced movement of Santa Fe Drlg
Company- equipment on location 12/21/71.
RU Santa Fe Drlg Company. Install 12" 2000# l~ydril on 15-5/8" conductor. SPUDDED
Bachatma Creek Unit #! at lZ:01 am 12/25/71. Drld 12-1/4" hole to 740'. R~ts
9-5/8''l 40~ K, 5~~ bu~t~e'~s cSgll~ hung w/shoe at 728'. Cmtd w/270 sx Class "G" ant.
[md 95 cu.ft, good ant returns to surface. CIP 9:50 pm lZ/2S/Tl!. WOC. Removed
hydril, cut off 15-5/8" conductor ~ welded t~ 9-5/8" csg. Installed Cameron 10" 5000#
studded unitized csg-tbg head. Installed 10" 5000# Double Shaffer ~ 10" ~000# hydril.
Tstd ok. Drld out cmt 687'-740'. Drld 8-1/2" hole 740'12719'.
Nowdrilling at 2719'. C~!
~4. I hereby certify that ~j~t~.;go ~;:]i
Union Oil and ~. ; D~i~ion: Western Region
Union Oil Company oT California
.909W. 9th Avenue, Anchorage, Alaska 99501
Telephone: (907) 279-7681
union
.January 3, 1977.
Yw. O.K. Gilbreth, Jr.
Chief Petroleum Engineer
Division of Oil 6 Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Sir:
Reference is made to Sundry Notice submitted December 21, 1971,
concerning the change in surface location of Bachatna Creek Unit #1.
This notice was inadvertently' marked as a gas well. The notice should
have been submitted as an exploratory well.
Please change this on your records to reflect the correction.
Very .l:rt~J.y you]
District Drill
~Superintendent
cc- Wade HcAlister
Note to files
UN ION BACHATNA CREEK UN IT NO. !
On Sunday night January 2, 1972, Mr. Ben Tally called to secure approval for
abandonment of the subject well. I agreed to abendoning the well in such a matter
that the West Foreland and Hemlock would be separated. ~he Hemlock and Tyonek would
be separated and a I00' plug would be placed inside and outside the surface casing
which was set around 700' and a I00' lineal plug would be set at the surface. Since
the location is above high tide mar~, the conventional dry-hole marker is to be in-
stalled with the operator's name, lease and well number, and the quarter section, ~~1
township and range are to be noted on the marker. Mr. Tailey advised that they were
working on an ice freeze-up type location and that all work, including clean-up work
would have to be consumated very rapidly. And they would have the location ready
for final inspection in the very near future. They will be moving to well no. 3
very soon and ! advised him we would want to check the BOPs prior to drilling out
surface casing. He said there would be no problem in this and would keep me advised.
REV. 9-30-69 & "Subsequent Reports" in Duplicate I C. ENG -
STATE O,F ALASKA __
OIL AND GAS CONSERVATION: COMMI]WEE .... ,','J~-3 EN?-J
" 6. LEA~E DE~IGNA.TION AND sERIA. L, ¢O:-'J" 4c::r.l'(~., J
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form /or proposals to drill or to dedpen
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT, FAI~M OR LF_J~SE NA'ME
__1__~ REV
Onion 0il Company of Califo~ia Ba~a~a Creek, 0nit i
909 ~. 9th Ave.~ ~ora~e, ~ka 99501 ~ tl
4. LOCATION OF W~L " 1~. F~ ~D POOL, OR WI~CAT
FILE:
~t ~-~ 815 ~ S ~ 1155 ~ ~r~ ~ Co.er ~ Sec. 21 ~ T 8N Ba~a~a Creek
R 16W~ ~ n. ssC.,om~zvs~ r'' R.. ~., ~O~O~ ~O~
Sec. 2,1~,T 8N~ R 16~
13. ELE~A'FIONS (Show whether DF. RT. GR. eec. 12. P~T ~O.
10'_ R.T.
Check Appropriate Box To I,ndicate Nature of N~ti'ce, Re
~ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-O]r~ I PULL OR ALTER CASING
FRACTURe. TREAT ! MULTIPLE COMPLETE
sUOOT o~ *C~DXZ~ ~
~PAIR W~LL eH*~
tOther) [. ,J
SUBSEQUENT REPORT OF:
SHOOTING OR ACIDIZINO O~ ABANDONMenT*
~Oth~) ~ge trace Loc.
(NOTS: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
!5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
Surface Location change due to terrain; moved location 507' N ~ 185' E.
Original Proposed Location:
1320'S ~ I320'W iro~ NE comer Sec. 21, T 8N, R 16W, S~I.
Actual Location:
'813'S-~ 1135'W from NE Comer Sec. 21, T 8N, R 16W, SM.
16. I hereby ce true an~ correct
[~.//// TITLE Drilling D~TE
Dist.
Supt
12-21/71
C0~DI~10~ 0[ tP~tS, l~ t ~: ~~e ~h~8 appa~ntly ~s to be/a ~as well too close to
property lines, the ~nit must be ~omplete~ or an exception obtained before
the well can be completed as ~ gas we~l. ,~.~-,ved Cop~
~ In~rudions ~ Rever~ Side Returned
~ Cmk. U~lt 1~. I
Un, t~ Ol I ~ of Cml I fornla
Permit No. 71-~
&~closed Is tt~ ~ tpplicatto, for Nr~lt ~to drl I t the above r~f®reflced
.tt, d~rt~ lt~ .~tb of ~r, 1971. at a Io~atlon tn Section 21, To~n-
~tl g~-tes ~d core ails ~r~ r~qt.tr~. A dlrectton~l surv~/ Is
~, a ~tstered ~w~for*s pla~ of tim location Is requ. lred prior to
-mmol~t oF drtltlH.
~ rivers In Alaska and ~thetr draln~ systms t~ve been cla, l ft~ as I~-
~n~ f~ '~ ~1~ ~ ~gr~?~ of a~r~s fl~. ~atlons In t~. ams
adv~ nofiflcaflo~ so tl~t ~ ~ay have a wlfness present..
yours
cc: '~~ of Fish and Oaae, itebltat Sectton ./o ~.cl,
De~t of Envlrome~al Conserver:Ion v/o enct.
STATE O.F ALASKA
OIL AND GAS CONSERVATION .COMMITTEE
APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR
DRILL [] DEEPEN []
?YP~ OF W~LL
O,Lw,.L,. [~ W,L,.°'" I---1 O,--,, Exploratory ,.or-."'~°L' [-1
2. NAME OF OPERATOR
Union 0il Company of California
3. ADDRESS O~V OPERATOR
909 W. 9th Avenue, Anchorage, Alaska
4.
LOCAT,ONOFW~LL 1320' S and 1320' W of NE cor Sec
At surface * '
SM.
13.
AtPr°~°sedpr°d'z°neSame as above - vertical hole
. . .
DISTANCE iN MILES AND DIRECT!ON F.~OM NEAREST TOWN OR POST OFFICe*
)NFER:
--
FILE:
R16W,
A - 133-20234
6. LE~SE D]~SIGNATION AND SI/:RIAL, NO.
ADL-46938
?.IF INDIAN, ALLOI~'EE OR TH/BE NAME
8. UNIT, FARM OR LEASE NAME
Bachatna Creek Unit
9. WELL NO.
No. 1
10. FIELD AND POOL, OR WILDCAT
IBachatna Creek - Wildcat
Il. SEC.. T., R., M., (BOTTOM
HOLE OBJECTIVE)
Sec. 21, T8N, R16W, S.M.
12.
Approximately 40 miles
14. BOND INFOILMATION:
TYprStatewide Surety and/or No. United Pacific Insurance Co. B-55372
DISTANCE FROM PROPOSED*
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT.
(Also to nearest dr(g, unit, if any)
18. NO. OF ACRF~ IN LEASE
1,320' 2,560
.
DISTANCE FROM PROPOSED LOCATION*
To NEASEST WELL DXILLmO, CO~P~ET~.
OR
APPLIED
FOR,
FT.
4½ mi I es
19. PROPOSEI~ DEPTH
2,700 '
A~o,,-t $100,000..00
17. NO. ACRES AS.qIGNED TO THi~q WELL
160
20. ROTARY OR CABLE TOOLS
Rotary
21. ELEVATIONS (Show whether DF, RT, CR, etc.~ 22. APPHOX, DATE WORK WII,I, ~TART*
10' R.T. December 1, 1971
23. PROPOSED CASING AND CEMENTING ~ROGRAM
,,
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOO~ GRAD~ S~i-r~G DEPTH QUANTIT! OF
,
13-3/8I' 13-3/8" 54.5# K-55 200 Driven and drilled
12-1/4" 9-5/8I' 40# K-55 600,, 300 sx "G" cmt. - cmt. to surface
8-1/2" 7'l .. 26# . Kr~5 ' 700 185 sx "G" Cmt. (shoe) F~I~
,,, :,,, 100 s~ "'G" cmt. th.r.U. DV
Drive 13-3/8" csg. to 200'+. Install 12".- 900 Hydril w/choke and kill spool. Drill
12-1/4" hole to 600'+, Run--600' 9-5/8" 40# K55 Buttress csg, and cement to surface with
class."G" cmt. Install Cameron 10" - 900 Unit head and 10" - 900 double Shaffer and
Hydril BOP. Drill 8½" hole to TD. Log and test as directed. If directed run 7" 26# K~55
Buttress casing to 27001+ w/Cmto, shoe on bottom and a DV@ 6~. fC~i~~s~gv~bove.
Perforate and complete w72-7/8" tubing as directed or abandol~{
UU
OEO 619 1
IN ABO%'-E SPACE DESCRIBE I~ROPOSED I~I~D(~RAMI: I~ pr~l~ll i~ ~o deepen or ptug back, give ~l~ill21~s~ff~t~. P~l~c~_x~__~_~d
proposed' new productive zone. If proposal is to drill or cl~epen direet~onall¥,, ,~ive pertlnen~ data on
true vertical depths. Give blowout preventer program.
S!~N~--.""~,~.~'.'' ....... / , DAT~_ December_ 6, 1971
(This space fo~ s~ate office use) CCDITIONS OF APPROVAL, I~ A~:
[ SA~IPL~ AND CORE CIilPS R~U~ ~ ~U~S:
Y~ , $ No SEE TRANSMITTAL LETTER
DI~IONAL SURVEY R~~ A.P.I. ~C~ CODE
District Land Manager
APPROV'ED BY. . , , - '- '
*S~ IMl~cl~ae~ On Reverse Side
December 8, 1971
December 8, 1971
BEARD OIL
ADL 46938
I'
SECOND STANDARD PARALLEL NORTH
m mmm m mm~mm m m mmmm m Jmmm m m m mm, mm
31
m
BACHATNA CREEK No.I
.~ UNION OIL COMPANY OF CALIFORNIA
_ ALASKA DISTRICT
WELL LOCATION PLAT
BACHATNA CREEK UNIT-
DATE: SEPT 17,1971 0 4o0o'
SCALE' I" = 4000'
CHECK LIST FOR NEW WELL PERMITS
· Yes No Remarks
1. Is well to be locate~ in a defined pool ................. , , /A~K ~
Lease & Well' No. /~Yoo/Jo/.o ~'~e~ /./~ ?z
-.
·
·
2. Do statewide rules apply ........................
3. Is a registered survey plat attached ......... , ........
4. Is well located proper distance from property line ...........
5( Is well located proper distance from other wells .............
6. Is sufficient undedicated acreage available in this pool ........
7. I s wel 1 to be devi abed ......................... /~
· ,
8. Is operator the only affected party ................... ~ ......
9. Can permit be approved before ten-day wait . . .- ............ z~yd_/~
10. Does operator have a bond in force ..... ~. .............
ll Is conductor string ~rovided '
1~. Is enough cement used to circulate on conductor and surface ......
11 cement tie in s=rface and intermediate or production strings
14. Will cement cover all possible productive horizons . . J ........
15. Will surface casing cover all fresh water zones ............
16. Will surface csg. i~mternal burst equal .5 psi/ft, to next string
17. Will all casing give adequate safety in collapse and tens(on ......
18. Does BOPE have sufficient pressure rating ...............
Additional Requirements: ~.~.~- r~:~.reo/~-~.~.~/.~"P.
Approval Recommende,~:
T~ ..- ,~,/. ~r;~) u~¢
KLV . J~ ~:?~-/~ '