Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
182-081
FilittiPei Ir WV STATE OF ALASKA �LASKA OIL AND GAS CONSERVATION COMM! APR 4 Z016 WELL MPLETION OR RECOMPLETION REPO AND LOG (�}�/�+r�[/e�j/� la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned l ' Suspended 0 lb.Well Class:AOGCC fir/w!. 20AAC 25.105 20AAC 25.110 Development p Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero ' Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 3/14/2016 • 182-081 " 315-730 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 7/13/1982 50-029-20753-00-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 7/25/1982 PBU C-21 • Surface: 884'FNL,1523'FEL,Sec.19,T11N,R14E,UM • 9 KB Ref Elevations 17. Field/Pool(s): 67-5 • Top of Productive Interval: 1317'FNL,2121'FEL,Sec.19,T11N,R14E,UM GL 33.1 • BF 34.6 • PRUDHOE BAY,PRUDHOE OIL • Total Depth: 1415'FNL,2270'FEL,Sec.19,T11N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: " 8960'/8809' • ADL 028305 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD). 19. Land Use Permit: Surface:x- 663845. y- 5960324 • Zone - ASP 4 - 9282'/9119' • 80-274 TPI: x- 663258 y- 5959878 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 663111 y- 5959777 Zone - ASP 4 None 2080'/2080' 5. Directional or Inclination Survey: Yes 0 (attached) No RI 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary DIL/BHCS/CDL/CNL/CAL/GR/SP,CBL/VDL/GR/CCL,Gyroscopic Survey 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20"x 30" 35' 115' 35' 115' 36" 8 cu yds Concrete 13-3/8" 72# L-80 34' 2670' 34' 2670' 17-1/2" 3883 cu ft Arctic Set II 9-5/8" 47# L-80 33' 8484' 33' 8359' 12-1/4" 1136 cu ft Class'G',130 ft Arctic Set I 7" 26# L-80 7968' 9280' 7882' 9117' 8-1/2" 368 cu ft Class'G' 3-1/2" 9.3# L-80 7991' 9146' 7903' 8988' Scab Liner 73 cu ft Class'G' 24. Open to production or injection? Yes 0 No RI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 3-1/2",9.2#,13Cr80 x 8048' 7755/7688' 5-1/2",17#x 4-1/2",12.6#,L-80 7882'/7803' Af•hP0 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. -€ E@41- flA7 E Was hydraulic fracturing used during completion? Yes 0 No 0 • 3��Nl H Per 20 AAC 25.283(i)(2)attach electronic and printed JUN^ information JUN SCANNED 2 4 2015 ‘;rp!c1Fr1 1.-I. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ------ 8960' --- 8960' Set Whipstock 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corn): Press 24 Hour Rate •• Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only 1G---1/7-1- 5/3/1 Lfa�� RBDMS Lk. APR 1 1 2016 =Lls-/•/4 28. CORE DATA • Conventional Core(s) Yes ❑ No 21 111 Sidewall Cores Yes 0 No 0 • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. s " 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No RI Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 8661' 8524' separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. Sag River Sst. 8542' 8413' Shublik 8576' 8444' Ivishak 8661' 8524' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Browning,Zachary H Email: Zachary.Browning@bp.com Printed Name: Joe Lastu Title: Drilling Technologist ` Signature: Phone: +1 907 564 4091 Date: LY!/ 1/E INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 MC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 MC 25.071. Item 31.Pursuant to 20 MC 25.070.attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • C-21, Well History (Pre-Rig Sidetrack) INITIAL T/I/O = 50/260/0 PSI. RUN#1 -- RIH W/20'X 2.74" DUMMY WHIPSTOCK DRIFT. TAGGED EVOTRIEVE PLUG @ 9130' MD. RUN#2 -- RIH W/ BAKER 35 KB PACKER WHIPSTOCK -- SET TOW @ 8960' W/ORIENTATION @ 5 DEG ROHS. DEPTH CORRECTED TO SLB JEWELRY LOG DATED 22-AUG-2012. WELL LEFT SHUT IN UPON 1/11/2016 DEPARTURE - NOTIFIED PAD OP OF WELL STATUS. FINAL TII/O = 0/260/0 PSI. SET WHIDDON IN XN-NIP @ 7,816' SLM, 7,824' MD. LAY DOWN FOR SLB SAFETY STAND 1/12/2016 DOWN. T/I/O=0/227/0 MIT-T to 3000 PASSED pumped 1.7 bbls dsl to reach test pressure lost 169 and 60 1/12/2016 psi bled tbg back to 0 rig off tbg standby for slickline. PULLED ST#3 RK-DGLV FROM 5193' SLM, 5,196' MD. SET ST#3 RKP-FLOW SLV @ 5193' SLM, 5,196' MD. CIRC IA TO TBG DOWN FLOWLINE (440 BBLS DIESEL). PULL ST#3 RKP- FLOW SLV FROM 5,193' SLM, 5,196' MD. SET RK-OGLV(20/64" ports) IN ST#3 @ 5,193' SLM, 5,196' MD. PULL ST#4 DGLV FROM 3,084' SLM, 3,092' MD. SET RK DOME-GLV(16/64" ports, 1,500#tro) IN ST#4 @ 3,084' SLM, 3,092' MD. PULL EMPTY WHIDDON FROM 7,816' SLM, 7,824' 1/13/2016 MD. MIT-T TO 2,500 PSI PASS. Pumped 2 bbl meth spear followed by 440 bbls diesel down IA taking returns up TBG down flowline to circ-out well. Pumped 2.5 bbls diesel to achieve test pressure. 1st 15 min TBG loss = 95 psi. 2nd 15 min TBG loss = 37 psi. Total loss in 30 min test= 132 psi. MIT-T 2500 psi ***PASS***. Bled TBG pressure to 300 psi. Bled back- 6 bbls. FP FL using WOA crude recipie 10 neat 113 crude 1/13/2016 FWEHP=300/0/0 (slickline on well has control annulus valves open to gauges). 2/25/2016 T/I/0=1400/0/0. Pre Nordic 2. Install CTD TS 06. PT tree cap to 500 psi. Final WHP's 1400/0/0. 2/26/2016 record on MV hand wheel. RDMO. FWHP=1400/0/0. T/I/O = 1060/10Nac. Temp= SI. Bleed WHPs (Pre CTD). No AL, flowline or wellhouse. Drilling scaffold installed. T FL &OA FL near surface. IA FL @ surface. Bled TP from 1060 psi to 0 psi (gas &0.3 bbls fluid)to slop tank in 50 mins. IA went on a vac. Monitored for 30 mins. TP increased 21 2/29/2016 psi. Final WHPs= 21NacNac. SV, WV& SSV= C. MV= 0. IA&OA= OTG. 11:55. • North America-ALASKA-BPPage 1 sae Operation Summary Report Common Well Name:C-21 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2016 End Date:3/23/2016 X3-017L6-C:(3,764,930.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/13/1982 12:00:00AM Rig Release:3/26/2016 Rig Contractor:NORDIC CALISTA UWI:500292075300 Active datum:ORIG KELLY BUSHING @67.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/11/2016 12:00 - 14:00 2.00 MOB P PRE RIG RELEASED FROM DS 3-21AT 1200 HRS. CONTINUE WITH PREPARATION FOR MOVING RIG OFF OF 3-21. COMPLETE PREP OF RIG AND SITE. PJSM FOR MOVING RIG OFF WELL 3-21. DISCUSSION FOCUSED ON: PLACING PHYSICAL BARRIER(12"X12" CHOCK)IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREE/WELLHEAD. ESD IN CELLAR IS FUNCTION TESTED AND MANNED BY NORDIC FIELD ,SUPERINTENDENT RADIO COMMUNICATION VERIFIED FOR ALL INDIVIDUALS INVOLVED IN THE MOVE THE AGREED PHYSICAL SIGN "COMMAND"AND RADIO COMMAND TO STOP THE RIG MOVE IS UNDERSTOOD BY ALL 14:00 - 16:00 2.00 MOB P PRE MOVE RIG OFF OF WELL -PLACE PHYSICAL BARRIER(12"X 12" CHOCK)IN PLACE BEHIND WHEEL -FUNCTION TEST ESD IN CELLAR -TEST RADIO COMMUNICATIONS WITH ALL HANDS -MOVE RIG OFF OF WELLAND TO EDGE OF PAD -PICK UP RIG MATS AND CLEAN UP AROUND 1 WELLAND PAD 16:00 - 00:00 8.00 MOB P PRE MOVE RIG FROM DS 3 TO C PAD.ARRIVE AT GUARD SHACK AT MIDNITE. 3/12/2016 00:00 - 08:30 8.50 MOB P PRE CONTINUE TO MOVE THE RIG FROM GUARD SHACK. WSL VERIFIED PRESSURE OF OA AND IA,0 PSI ON BOTH. -CONDUCT CREW CHANGE,MOVE RIG ONTO ACCESS ROAD. STAGE RIG ON C-PAD. -PJSM FOR PULLING OVER WELL. DISCUSSION FOCUSED ON RIG MOVE CHECKLIST AND WELL PLAN CRITERIA. CREW UNDERSTANDS RADIO COMMUNICATION AND THE AGREED PHYSICAL SIGN"COMMAND"AND RADIO COMMAND TO STOP THE RIG 08:30 - 09:30 1.00 MOB P PRE MOVE RIG OVER WELL. -PLACED PHYSICAL BARRIER(12"X12" CHOCK)IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREE/ WELLHEAD. -FUNCTION TESTED ESD IN CELLAR BEFORE MOVING RIG AND WAS MANNED BY NORDIC FIELD SUPERINTENDENT WHILE MOVING RIG I-CHECKED RADIO COMMUNICATIONS WITH ALL SPOTTERS AND DRIVER RIG ACCEPT AT 0930 HRS 09:30 - 11:00 1.50 MOB P PRE PREPARE FOR RIG OPS: -BUTTON UP CELLAR -STAGE SUPPORT EQUIPMENT -CYCLE SSV AND ALL TREE VALVES IN PREPARATION FOR LEAK TIGHT TEST. NO PRESSURE FROM WELL. Printed 3/28/2016 3:10:01PM *All depths reported in Drillers Depth* • North America-ALASKA-BP • Page 2 Operation Summary Report Common Wet Name:C-21 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2016 End Date:3/23/2016 X3-017L6-C:(3,764,930.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/13/1982 12:00:00AM Rig Release:3/26/2016 Rig Contractor:NORDIC CALISTA UWI:500292075300 Active datum:ORIG KELLY BUSHING©67.50usft(above Mean Sea Level) Date From-To Hrs Task Code j NPT NPT Depth Phase Description of Operations (hr) (usft) _ 11:00 - 15:45 4.75 BOPSUR P PRE NU BOP 15:45 - 17:30 1.75 RIGU P PRE INSTALL STUFFING BOX ONTO LUBRICATOR EXTENSION TO BOP. NU GOOSENECK, INSTALLAND MU INJECTOR. 17:30 - 20:30 3.00 RIGU P PRE -VALVE CREW CHECK TORQUE ON BOLTS ON TREE AND GREASE VALVES. --PJSM,PULL TEST GRAPPLE,REMOVE SHIPPING BAR FROM COIL,PULL COIL 'ACROSS TOP AND STAB INTO INJECTOR.CUT GRAPPLE OFF.SECURE COIL IN GOOSENECK.RD STABBING CABLE.RU • INJECTOR SIDE PULL BACK CABLE. • -CONDUCT PRE-SPUD WITH NIGHT CREW DURING NIGHT PTM • 20:30 - 23:30 3.00 RIGU P PRE GET STACK MEASUREMENTS. SET TEST PLUG. GREASE MUD CROSS. FILL SURFACE LINES,MGS,STACK WITH WATER. -- 23:30 - 00:00 0.50 BOPSUR P PRE SHELL TEST 300PSI/4500PSI-PASS. TEST BOPE PER NORDIC PROCEDURE / AOGCC/ WELL PROGRAM FROM RIG FLOOR &SLB REMOTE PANEL ALL TESTS INCLUDING ANNULAR ARE BEING TAKEN TO LOW 250 PSI/HIGH 3500PSI FOR 5 CHARTED MINUTES EACH **AOGCC REP JEFF JONES WAIVED WITNESS BY EMAIL ON 03/11/2016 AT 08:13 3/13/2016 00:00 - 03:00 2.00 BOPSUR P PRE CONTINUE TO TEST BOPE. -ALL TESTS TO LOW 250 PSI/HIGH 3500PSI I FOR 5 CHARTED MINUTES EACH. HAVING DIFFICULTY TO GET STABLIZED FLAT-LINE DUE TO COLD,TAKING TIME TO OBTAIN FLAT-LINE. -TEST ALLAUDIBLE AND VISUALALARMS -CONDUCT PRE-SPUD WITH DAY CREW DURING MORNING PTM 03:00 - 03:00 0.00 BOPSUR P PRE DAY LIGHT SAVING TIME. 03:00 - 08:00 5.00 BOPSUR P PRE CONTINUE TO TEST BOP PER REQUIREMENTS 08:00 - 11:30 3.50 BOPSUR P PRE INSTALL BOOT ONTO E-LINE. INSTALL COIL CONNECTOR,PRESSURE TEST COIL CONNECTOR AND HIGH PRESSURE SCREEN CONNECTIONS. STAB ON,PRESSURE TEST PACKOFFS AND INNER REEL VALVE TO 250 PSI LOW/3500 PSI HIGH. -OBTAINING GOOD LOW TEST BUT DIFFICULT TO GET FLAT-LINE ON HIGH PRESSURE TEST DUE TO FLUID COOLING OFF AND SHOWING PRESSURE DECREASE. BREAK CIRCULATION TWICE TO AVOID FREEZING COIL. - THIRD TEST STABILIZED FOR 5 MINUTE FLAT-LINE AT 3500 PSI. Printed 3/28/2016 3.10.01PM *AII depths reported in Drillers Depth* • North America-ALASKA-BP • Page 3 Operation Summary Report Common Well Name:C-21 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2016 End Date:3/23/2016 X3-017L6-C:(3,764,930.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/13/1982 12:00:00AM Rig Release:3/26/2016 Rig Contractor:NORDIC CALISTA UWI:500292075300 Active datum:ORIG KELLY BUSHING @67.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 11:30 - 12:00 0.50 RIGU I P PRE PJSM FOR CONDUCTING PRESSURE TEST I OF PRESSURE BULKHEAD AND REELHOUSE I IRON THAT WILL BE USED IN CEMENTING OPERATION. -REVIEW NORDIC PRESSURE TESTING PROCEDURE,BP PRESSURE CROSSCHECK CHECKLIST,AND DHD PRESSURE TESTING PROCEDURE -DISCUSS LOW AND HIGH EXPECTED PRESSURES,WEAK LINKS IN SYSTEM AND HOW TO MITIGATE THEM FROM SEEING PRESSURE,PERSONNEL DUTIES INVOLVED IN TESTING 12:00 - 15:30 3.50 RIGU P PRE CLOSE INNER REEL VALVE,BRING UP TEST PRESSURE OF BULKHEAD TO 250 PSI LOW WITH GOOD TEST. INCREASE PRESSURE FOR HIGH PRESSURE TEST. PRESSURE UP TO 6305 PSI. BLED 15 PSI IN 5 MINUTES TO 6290 PSI FOR GOOD TEST PER CRITERIA IN BP PRACTICE 10-45. -BLEED SYSTEM OFF,RE-ALIGN VALVES TO - OPEN INNER REEL VALVE AND BY-PASS MICROMOTION WITH BLEEDER VALVE FOR TATTLETALE. LOW PRESSURE TEST TO 250 PSI GOOD. BRING PRESSURE UP TO 6307 PSI,BLED TO 6298 PSI FOR GOOD TEST. BLEED DOWN SYSTEM. -MOBILIZE DHD EQUIPMENT OFF RIG 15:30 - 16:00 0.50 RIGU P PRE CONDUCT RIG EVACUATION DRILL WITH DAY CREW. SIMULATE OUT-OF-CONTROL FIRE, EVACUATE RIG. GOOD DRILL FOLLOWED BY MR. 16:00 - 17:30 1.50 STWHIP WEXIT PULL BOP TEST PLUG. PJSM ON MAKING UP NOZZLE ASSEMBLY. -MU NOZZLE BHA WITH DUAL BACK PRESSURE VALVES. STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. -PJSM ON INITIAL ENTRY,OPEN UP TO WELL WITH TESTED BARRIER,NO PRESSURE ON WELL 17:30 - 19:20 1.83 STWHIP N HMAN WEXIT RIH WITH NOZZLE ASSEMBLY DISPLACING TO FLOW BACK TANK PER NORDIC FLUID MANAGEMENT POLICY.TAG BOTTOM AT 8960FT. 19:20 - 22:50 3.50 STWHIP N HMAN WEXIT PUMP 200BBLS OF 115DEG F 1%KCL TO REMOVE GASEOUS FLUID OUT OF WELL BORE(4 BOTTOMS UP)FOLLOWED BY 19.5PPG POWERPRO AT 2.4BPM/3780PSI. I NOTICE HIGHER THAN NORMAL DOWNSTREAM PRESSURE RESULTING IN HIGHER THAN EXPECTED WHP WITH VERY I LOW PRESSURE BLEED OFF RESPONSE ON LINE GOING TO TIGER TANK.STOP& DISCUSS-POSSIBLE DEBRIS.NOTICE HIGH PRESSURE NOISE COMING FROM 2"VALVE ON TIGER TANK LINE ON RIG(CH2HILL). BLEED DOWN IA THREE TIMES. _ 22:50 - 23:00 0.17 STWHIP N HMAN WEXIT FLOW CHECK-NO FLOW. Printed 3/28/2016 3.10:01PM *All depths reported in Drillers Depth* 4110 North America-ALASKA-BP • Page 4 o1Q8 Operation Summary Report Common Well Name:C-21 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2016 End Date:3/23/2016 X3-017L6-C:(3,764,930.00) Project:Prudhoe Bay Site:PBC Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/13/1982 12:00:00AM Rig Release:3/26/2016 Rig Contractor:NORDIC CALISTA UWI:500292075300 Active datum:ORIG KELLY BUSHING©67.50usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr)23:00 - 00:00 1.00 STWHIP N HMAN (usft) WEXIT POH.PUMP 1.756PM/3175PSI WHILE POH. NOTICE HIGHER THAN NORMAL CIRC PRESSURE VERSUS EXPECTED RATE. 3/14/2016 00:00 - 00:30 0.50 STWHIP N HMAN WEXIT CONTINUE TO POH WITH NOZZLE BHA.PJSM REGARDING LD NOZZLE BHA. 00:30 - 00:50 0.33 STWHIP N MISC WEXIT POP OFF WELL.LD NOZZLE BHA.LARGE AMOUNT OF CEMENT CHUNKS IN NOZZLE. PLACE INJECTOR OVER BUNG HOLE. REMOVE 2"HARDLINE VALVE FROM RIG. RECOVER LARGE(2.25"x1.75"x0.75")PIECE OF LEAD.BUTTON UP HARDLINE. 00:50 - 01:00 0.17 STWHIP N HMAN WEXIT PJSM REGARDING MU XN MILLING BHA. 01:00 - 01:30 0.50 STWHIP N HMAN WEXIT MU XN MILLING BHA.#2.STAB ONTO WELL. TEST QTS 250PSI/4000PSI.SET COUNTERS. CIRC 0.25BPM/923PS1. 01:30 - 03:05 1.58 STWHIP N HMAN WEXIT RIF!WITH XN MILL BHA.CIRC 0.24BPM/952PSI.WEIGHT CHECK AT 7800FT, RIW 25K,PUW 34K.DRY TAG AT 7826FT. 03:05 - 06:00 2.92 STWHIP N HMAN WEXIT CIRC AT 1.23BPM/2500PS1. MILL XN PROFILE AT 7826'. MAINTAIN CIRC RATE OF 1.25 BPM AND 300-400 PSI DIFFERENTIAL PSI. -MAKE TOTAL OF THREE PASSES THROUGH XN PROFILE,DRIFT RUN CLEAN DOWN TO 8100' -FLOW CHECK,ALL GOOD 06:00 - 07:30 1.50 STWHIP Int HMAN WEXIT POH WITH MILLING BHA. PJSM FOR FLOW CHECKAND HANDLING BHA. FLOW CHECK AT SURFACE,ALL GOOD. POP OFF. 07:30 - 08:00 0.50 STWHIP N HMAN WEXIT LD BHA#2. MILL IN GOOD SHAPE,GAUGE OF 2.80"GO,2.79"NO-GO. 08:00 - 11:15 3.25 STWHIP P__ WEXIT PUMP 3/4"DRIFT BALLAROUND,CAPTURE BALL. CUT OFF CURRENT COIL CONNECTOR,CUT 274'OF COIL TO OBTAIN 1.75%SLACK. RE-INSTALL CTC COIL CONNECTOR. PUMP SLACK FORWARD. 11:15 - 14:00 2.75 STWHIP P WEXIT TEST E-LINE,GOOD TEST. HEAD UP WITH BHI UPPER QUICK CONNECT SUB. PRESSURE TEST CONNECTION,GOOD TEST. INSTALL DUAL FLAPPER CHECK VALVES, STAB ON AND PRESSURE TEST TO 250 PSI LOW/3500 PSI HIGH. 14:00 - 14:30 1 0.50 STWHIP P WEXIT I CONDUCT CREW CHANGEOUT AND SAFETY WALK AROUND -OPEN UP WELL TO TESTED BARRIERS. NO PRESSURE,NO FLOW. ALL GOOD,POP OFF WITH INJECTOR AND STAND TO SIDE. 14:30 - 15:15 0.75 STWHIP P WEXIT PJSM ON MAKING UP BHA#3. MU 2.80" DIAMOND SPEED WINDOW MILLAND STRING REAMER ASSEMBLY ONTO.6°BEND MOTOR AND BHI SMART TOOLS. _ 1 -STAB ON WITH INJECTOR Printed 3/28/2016 3:10:01 PM *All depths reported in Drillers Depth" North America-ALASKA-BP Page 5 pf$.8 Operation Summary Report Common Well Name C-21 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2016 End Date:3/23/2016 X3-017L6-C:(3,764,930.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/13/1982 12:00:OOAM Rig Release:3/26/2016 Rig Contractor.NORDIC CALISTA UWI:500292075300 Active datum:ORIG KELLY BUSHING @67.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:15 - 17:15 2.00 STWHIP P WEXIT PRESSURE TEST QUICK TEST SUB WHILE WAITING ON MWD TO SET DEPTH,OPEN EDC. -RIH WITH MILLING BHA#3 -BHI TOOLS ARE ACTING ERRATIC, POWERING ON AND OFF AT VARYING INTERVALS. BHI PERSONNEL -TROUBLESHOOTING ON TRIP IN,CHECKING CABLES. STAGE BHA AT LOGGING DEPTH OF 8640'IN PREPARATION TO CONDUCT PRIMARY DEPTH CONTROL LOGGING RUN,STOP MOVEMENT -MW IN 9.41 PPG,MW OUT 9.41 PPG 17:15 - 17:30 0.25 STWHIP N WEXIT TROUBLESHOOT POWER AND COMMUNICATION ISSUES.WHIL WAITING, CONDUCT FLOW CHECK DUE TO ANOMALY IN MUD DENSITY READING. NO FLOW. AS ISOON AS PUMPS WERE BROUGHT UP TO FULL RATE,DENSITIES WERE GOOD. 17:30 - 19:00 1.50 STWHIP P WEXIT CONTINUE TO RIH.CIRC MIN RATE. 19:00 - 19:45 0.75 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 8640'CIRC AT 0.25PSI/1100PSI.PLUS 16FT CORRECTION. 19:45 - 20:00 0.25 STWHIP P WEXIT CONTINUE TO RIH WITH MILLING BHA#3. 20:00 - 00:00 4.00 STWHIP' P WEXIT MILL WINDOW FROM 8959.5FT.DWOB= D� 0.25-3.02K. 1.62/1.62 BPM IN/OUT 9.49/9.40 PPG AT C !/ 1'4 3890PSI. IA/OA 125/157 ECD 11.30 BLED DOWN IA FROM 145PSI&OA FROM 445PSI TO OPSI. MILL TO MIDNIGHT DEPTH OF 8962FT. n 3/15/2016 00:00 - 03:15 3.25 STWHIP P WEXIT MILL WINDOW FROM 8962.4FT.DWOB =1.8-3.02K. 1.62/1.62 BPM IN/OUT 9.49/9.40 PPG AT 3890PSI. IA/0A 46/271 PSI(BLED IA FROM 175 PSI TO 0 PSI),ECD 11.30 MILL TO DEPTH OF 8965.5FT. `LOSS OF WOB AT 8964.72'.CONTINUE AT 1'/HR AS PER PLAN. 03:15 - 04:10 0.92 STWHIP P WEXIT REAM WINDOW -PUMP 5 BBLS LO-VIS FOLLOWED BY 5 BBLS HI-VIS SWEEP -REAM WINDOWAS PLANNED 3 TIMES -PUW 41K,SOW 38K -SHUT DOWN PUMPS AND DRY DRIFT WINDOWAS DRILLED TOOLFACE -SOW 30K,PUW 45K 04:10 - 06:00 1.83 STWHIP P WEXIT POH WITH MILLING BHA#3 -POH ABOVE WINDOW -FLOWCHECK WELL FOR 10 MINUTES-WELL STATIC -OPED EDC -POH WITH MILLING BHA -MM IN/OUT-1.96/1.57 BPM,MW IN/OUT- 9.50/9.36 PPG,PUMP PRESSURE-3620 PSI, PUW 34K -FLOWCHECK BEFORE BHA CROSSES BOP STACK-WELL STATIC -POP OFF WITH INJECTOR Printed 3/28/2016 3:10:01PM *All depths reported in Drillers Depth* • North America-ALASKA-BP Page 6 etiY Operation Summary Report Common Well Name:C-21 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2016 End Date:3/23/2016 X3-017L6-C:(3,764,930.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/13/1982 12:00:OOAM I Rig Release:3/26/2016 Rig Contractor:NORDIC CALISTA UW:500292075300 Active datum:ORIG KELLY BUSHING©67.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 06:15 0.25 STWHIP P WEXIT BREAK OFF BHA#3,MILL GAUGED AT 2.80 NO GO,STRING REAMER GAUGED OUT AT 2.79 GO,2.78 NO GO. -SEND MOTOR TO BOT TO REMOVE MILL AND BUCK UP NEW MILL FOR NEXT RUN. 06:15 - 07:00 0.75 STWHIP N WEXIT WAIT ON MOTOR AND FAT RADIUS MILL TO RETURN FROM BOT MACHINE SHOP TO BE TORQUED UP 07:00 - 08:00 1.00 STWHIP P WEXIT MOTOR BACK ON LOCATION. CHANGE BEND ON MOTOR TO 2.0°,MU SECOND MILLING BHA#4. STAB ON WITH INJECTOR. 08:00 - 11:30 3.50 STWHIP P WEXIT PRESSURE TEST QUICK TEST SUB WHILE MWD INPUTS BHA INFORMATION AND POWERS ON. -RIH. LOG TIE-IN WITH+2'CORRECTION. RECORD UP AND DOWN WEIGHTS BEFORE MILLING OPERATION. EASE DOWN TO 8965' TO INITIATE MILLING. 11:30 - 18:00 6.50 STWHIP P WEXIT BEGIN MILLING OPERATION ON 7"CASING FROM 8966'. FREE SPIN OF 3580 PSI AT 1.65 BPM. MW IN 9.47 PPG,MW OUT 9.40 PPG,1 TO 1 RETURNS MILL PER SCHEDULED TIME AND WOB PARAMETERS IN WELL PLAN. MAINTAIN CONSISTENT 1.61 BPM FLOW RATE. -CALCULATED EXIT AT 8969',INDICATIONS OF WOB DROPPING OFF ACCORDINGLY. CIRC PRESSURES REMAINED FAIRLY STEADY AT 3580-3680 PSI UNTIL MILL BEGAN TO CONTACT FORMATION. PRESSURES ROSE TO 3755-3780 PSI AT SAME FLOW RATE. -IA INCREASED FROM 25-140 PSI,OA FROM 70-435 PSI. 18:00 - 19:30 1.50 STWHIP P WEXIT MILL RATHOLE FROM 8972'.FREE SPIN OF 3580 PSI AT 1.65 BPM. -MM IN/OUT-1.61/1.62 BPM,MW IN/OUT- 9.50/9.41 PPG,CIRC PRESSURE 3699 PSI, I TEMP IN/OUT 85.7/84.3 DEGREES WOB2.5-3.8K,EDC 11.31PPG, -IA/OA-145/450 PSI.BLEED DOWN IAAND OA TO 0 PSI. IA/OA 22/45 PSI -MILL TO 8975'(END OF RATHOLE) 19:30 - 22:50 3.33 STWHIP i P WEXIT START REAMING PASSES. PUMP SWEEP -REAM WINDOWAT 45°LEFT /45°RIGHT -NO MOTOR WORK SEEN. -1.61 BPM IN /1.63 BPM OUT -9.48 PPG IN/9.40 PPG OUT 22:50 - 23:40 0.83 STWHIP P WEXIT SHUT PUMPS DOWN DRY DRIFT WINDOW. OPEN EDC. PUMP FINAL PILL TO BIT. 10 BBLS LOVIS /10 BBLS HIVIS '23:40 - 00:00 0.33 STWHIP P WEXIT PERFORM 10 MIN FLOW CHECK. WELL STATIC. POOH 3/16/2016 00:00 01:10 1.17 STWHIP P WEXIT POOH WITH WINDOW MILLING BHA 01:10 - 01:20 0.17 STWHIP P WEXIT PERFORM 10 MINUTE FLOW CHECK. WELL STATIC Printed 3/28/2016 3:10:01 PM *AII depths reported in Drillers Depth* TREE= CM/FLS WELLHEAD 6"X�MCEVOY • C-2 1 NOTES:***CHROME TBG•" ACTUATOR= BAKER C QKB.ELEV= 67.5' 24' H4-1/2"X 3-1/2 XO,D=2.992' BF.ELEV= 34.6' KOP= 6800' 2222' --13-1/2"HES X NP,D=2.813" Max Angle= 27'@ 7500' Datum MD= 9021' Datum ND= 8800'SS 259W —19-5/8"DV fi(R 4-1/2"TBG, 12.6#,13CR TC11, H 24' GAS LFT MANDRELS 0152 bpf,D=3.958" ST MD ND DEV TY FE VLV LATCH PORT DATE 4 3092 3092 1 14/PAG DOME RK 16 01/13/16 11[ 11 3 5196 5196 1 !WIG SO RK 20 01/13/16 13-3/8"CSG,72#,L-80,BTRS,D=12.347" —1 2670' 2 6794 6792 9 WAG DMY RK 0 07/20/08 1 7665 7606 25 MAG DMY RK 0 07/20/08 Minimum ID =2.75" @ 7824" 3-1/2" HES BXP XN NIPPLE 7723' —13-1/2"HES XNP,ID=2.813" 7744' —13-1/2"X 4-1/2"XO,ID=2.950" `/ 7745' --19-5/8"X 4-1/2'BKR S-3 PKR,ID=3.875' 7751' —14-1/2"X 3-1/2"X0,ID=2.950- 7771' —13-1/2"FES X NP,ID=2.813" 7824' —13-1/2"FES BXP XN NP,D=2.75" 3-1/2"TBG,9.2#,13CR VAM H 7847' 7845' —13-1/2"X 4-1/2"X0,ID=2.992" TOP,.0087 bpf,D=2.992" 7857' —5-1/2"TBG STUB(03/06/06) 5-1/2"TBG,17#,L-80,0232 bpf,D=4.892" —1 7884' 1— 7861 —14-112"MULE SHOE D=3.958" 8"x2"x1/2"SLIP SEGMENT(FOR PHOTOS,SEE --1 UNKNOWN 14/ 7884' —{9-518"OTISPKR,D=4.00" RWO FLE 3/15/06-COULD BE N 1 OF 2 LOC.) 7"BOT LNR HGR W/TEBACK SLV --i 7968' r : 7965' —14-1/2"OTIS X tom,D=3.813" 7"LNR,26#,L-80,.0383 bpf,D=6.276" —{ 7982' 7991' - 13.75"BKR DEPLOYMENT SLV,D=3.00" 8006' —14-1/2"OTIS XN NP,D=3.725"(BAND PIPE) 4-1/2"TGB,12.6#,L-80,.0152 bpf,D=3.958" —{ 8048' 8049' —14-1/2"WLEG(BEHIND PIPE) 8042' ELMO TT LOGGED 05/04/93 1� 9-5/8"CSG,47#,L-80,.0732 bpf,D=8.681' --[ 8484' -1-41 3-112"LNR 9.3#,L-80-JT1,.0087 bpf,ID=2.992" J 9145' t 8775' —{TOC-SCMT RLN LOGGED(10/02/15) +� it '1'��'�� 8960" 13-112"BKR KB PKR WHIPSTOCK w/2 PP REF LOGBHCS BF 07/25/82 1111 1�1• 11 l. TAGS(01/11/16) 1 . ANGLE AT TOP PERF:16"@ 9030' Nvfl � 114 9130' H3-1/2"EV OTREV E PLUG(10/02/15) Note:Refer to Production DB for historical perf data SPF SE SINTERVAL Opn/Sqz SHOT SQZ 9146' �T GUMSHOE, =2.992' D 3-3/8" 4 9027-9030 S 08/22/96 04/04/99 2" 6 9030-9035 C 05/11/14 3-3/8" 4 9046-9134 S 08/22/96 04/04/99 2-1/2" 4 9143-9153 C 01/05/01 2-1/2" 4 9153-9173 C 01/05/01 2-1/8" 6 9155-9175 C 08/25/99 3-3/8" 6 9165-9192 C 08/31/96 PBTD H 9237' 11tat1111111,4 [7"LNR,29#,L-80,.0371 bpf,D=6.184" - 1 9280' �ilAii1£1A1A1i A DATE FEV BY CONVENTS DATE REV BY COMMENTS PRU HOE BAY 1)47 07/12/82 INITIAL COMPLETION 01/26/16 SWC/JMD GLV C/O(01/13/16) WELL: C-21 04/04/98 NORDIC 3-1/2"SCAB LNR 04/07/16 JNUJMD CORRECTED PKR DEPTH PER TALLY PERMIT No:'1820810 03/14/06 N3S RWO API No: 50-029-20753-00 10/13/15 RCR/JMD UPDATED TOC PER SCMT(10/02/15) SEC 19,T11 N,R14E,884'SNL&1523'WEL 12/07/15 GTW/JMD GLV GO(10/01/15) 01/12/16 MRD/AD SET WHIPSTOCK(01/11/16) 11 BP Exploration(Alaska) oFr rye THE STATE • • ,i)" �jy,sAAlaska Oil and Gas � %' - � of® � i\ SJ(i\ Conservation Commission s - } z__ 333 West Seventh Avenue / GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 ^h'i Main: 907.279.1433 ALAS Fax: 907.276.7542 5��6e��EU yf 0 9 'I www.aogcc.alaska.gov [ John McMullen � Engineering Team Lead ��f BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-21 Sundry Number: 315-730 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 161 /° C Cathy P. Foerster Chair DATED this I`$ day of December, 2015 Encl. RBDMS DEC 212015 STATE OF ALASKA ECEIVED •ALASKA OIL AND GAS CONSERVATION COM N DEC 0 3 2015 APPLICATION FOR SUNDRY APPROV LS 20 AAC 25.280 owI 2( I r�/` _ 5 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate 0 Pull Tabing 0 Change Approved Program ❑ Plug for Redrill p. Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing 0 Other ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 182-081 Exploratory LI Development p- a Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-20753-00-00 • 99519-6612 Stratigraphic LI Service 0 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No p PBU C-21 - 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028305 • PRUDHOE BAY,PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 9282. 9119 • 9130 8973 2364 9130 7913 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"x 30" 35-115 35-115 Surface 2635 13-3/8" 34-2670 34-2670 4930 2670 Intermediate 8452 9-5/8" 33-8484 33-8359 6870 4760 Liner 1312 7" 7968-9280 7882-9117 7240 5410 Liner 1155 3-1/2" 7991 -9146 7903-8988 10160 10530 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 9030-9192 8876-9032 3-1/2",9.3#x 5-1/2",17#x 4-1/2",12.6# 13Cr80/L-80 31 -7871 Packers and SSSV Type: 5-1/2"Otis Packer Packers and SSSV MD(ft)and TVD(ft): 7882/7803 4-1/2"Baker S-3 Packer 7755/7688 12.Attachments: Proposal Summary p Wellbore Schematic p 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch p Exploratory ❑ Stratigraphic ❑ Development p • Service ❑ 14.Estimated Date for Commencing Operations: December 15,2015 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended p 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG o Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned LI 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Browning,Zachary H be deviated from without prior writte appro al. Email Zachary.Browning@bp.com Printed Name _ '' Title Engineering Team Lead Signatu Phone +1 907 564 4711 Date /2 6 / COMMISSION USE ONLY Co .itions of approval:Notify Commission so that a representative may witness Sundry Number: 15. 7 O Plug Integrity EJ BOP Test Mk Mechanical Integrity Test 0 Location Clearance ❑ Other: 5/)P 7,--c t-- 4-4 7800 /24i /" ?175 /3 2344 /25/9 ) frvi vt r-//q r p rt de N f l r 1- s-t 7.0 Z SG v p s.-1�•• Al 1f 1-7-7.3 1-L--P/�1j7J e 1'12 1Z" c�./.7pre..,ved pr•- 2.c' .9-4-C 2 5--11 Z Post Initial Injection MIT Req'cr? .fes 0 No 0 Spacing Exception Required? Yes 0 No Gd/ Subsequent Form Required: it)— 40-7- APPROVED Approved by: t1^_� COMMISSIONER COMMISSION Date: Date: YT re /4//s Ci RBDIVISJ DEC 212015 ORIGINAL ,,,6 (z.. ,. .,� Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • To: Alaska Oil & Gas Conservation Commission From: Zach Browning bp CTD Engineer Date: November 9, 2015 Re: C-21 Sundry Approval Request Sundry approval is requested to plug the C-21 perforations as part of the preparation, drilling and completing the proposed C-21A coiled tubing sidetrack. History of C-21: C-21 was completed as a vertical well perforated in Zone 2 back in 1982. Multiple squeeze and perf jobs were performed and in 2005 a RWO was needed to keep C-21 online. The history of perf/squeeze/reperf has left this well without the ability to control where the flow is coming from and has limited the ability to re-perforate and drain the remaining oil lenses. Re-drilling and cementing — new liner through the build section is proposed and will provide a fresh interval to be logged and selectively perfed. The wellbore has confirmed integrity and is fit for sidetrack. Proposed plan for C-21A: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around January 25th, 2016. The C-21A sidetrack will be a dual string exit from the existing 3-1/2" liner x 7" liner. A packer whipstock will be set pre-rig allowing isolation from the parent perforations. The planned well kicks-off in lower Zone3, builds through the conglomerates and will land and target reserves in Zone 2A/1 B. The proposed sidetrack is a -3015' horizontal Ivishak producer to be completed with a 2-3/8" L-80 solid liner, cemented in place and selectively perforated. This Sundry covers !Jugging the existing C-21 perforations via the packer whipstock set pre-rig and liner cement lob or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. �/ cP�cl�'� ago( /5 6- /ewe`/ el��i�h 10 c/i 11 54,/r/ c// i fi°I ' 710/� 0� 14e ,00� • • • Pre-Rig Work(scheduled to begin December 15th, 2015) 1. S Drift for Whipstock. Set Generic GLVs. 2. F A/SL: Circ IA to diesel 3. E Set 3-1/2" Packer Whipstock. 4. F A/EL: Load and kill well. MIT-T. 5. V Pre-CTD tree work. Thr`5. 5"-z-cfr - Rig Work(scheduled to begin January 25th, 2016) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,364 psi). 2. Mill 2.80"window and 10' of rathole. 3. Drill build: 3.25" OH, -366' (25 deg DLS planned). 4. Drill lateral: 3.25" OH, -2650' (12 deg DLS planned). 5. Run 2-3/8" L-80 liner leaving TOL at-8930' MD. 6. Pump primary cement job: 18 bbls, 15.3 ppg Class G, TOC at-8930' MD.* 7. Perform liner lap test. 8. Freeze protect well to a min 2,200'TVDss. 9. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install wellhouse, and flowline. 2. Set liner top packer if liner lap test fails.* 3. GR/CCL/RPM log. Perforate -200' based on log interpretation. Zach Browning CC: Well File CTD Engineer Joe Lastufka 564-5220 • TREE= 6"X 7"CNV FL.S • C-2 I S `/"NOTES:***CHROME TBG*** 1 WELLHEAD= NK;EVOY t ACTUATOR= BAKER C OKB.ELEV= 67.5' —1 " " I 24' --14-1/2"X 3-1/2 XO,Q=2.992" BF.E_EV= 34.6' KOP= 6800' 1 1 1 2222' —13-1/2"HES X NP,D=2.813" 1 N6x Angle= 27°@ 7500' Datum MD= 9021' Datum TVD= 8800'SS = 2598' H9-5/8"DV FKR 4-1/2"TBG,12.6#,13CR TC11, I 24' GAS LFl MANS [ST ND TVD DEV TY t£ VLV LATCH FORT DATE .0152 bpf,ID=3.958" 4 3092 3092 1 PAG DOME RK 16 08/27/12 .._._.7 13-3/8"CSG,72#,L-80,BTRS,D=12.347"1--1 2669' 3 5196 5196 1 MAAG DONE RMC 20 08127f12 2 6794 6792 9 MMG DMY RK 0 07/20/08 1 7665 7606 25 MNG DMY RK 0 07/20/08 Minimum ID =2.75" @ 7824" 3-1/2" HES BXP XN NIPPLE 1 7723' —13-1/2'HES xNIP,ID=2.813" — 7744' --13-112'X 4-1/2'XO,D=2.950" 7745' —19-5/8"X 4-1/2"BKR S-3 PKR,D=3.875" 1 7751' H4-1/2"X 3-1/2"X0,ID=2.950" 1 7771' H3-1/2"HES X NP,D=2.813" 1 7824' —13-1/2"FES BXP XN IM',D=2.75" 3-1/2'TBG,9.2#,13CR VAM —1 7847' 7845' H3-112"X 4-112'X0,D=2.992" TOP,.0087 bpf,D=2.992" 7857' _H5-1/2"TBG STUB(03/06/06) 5-1/2"TBG,17#,L-80,0232 bpf,D=4.892 —1 7884' I-- 7861' —14-112"MULE SHOE D=3.958" 18'x2"x 112"SIP SEGNEIN T(FOR PHOTOS,SEE —1 UNKNOWN ";44 r— 7914'1-r9-5/8"OTIS PKR, )=a.00"-1 I RWO FLE 3/15/06-COULD BE N 1 OF 2 LOC.) 7'BOT LNR HGR WI TEBACK SLV —{ 7967' 1------ 7965' 4 112'OTIS X ,D=3.813' 7991' —+3-3/4"BKR DEFLOY KENT SLV,Q=3.00" 8006' H4-1/2"OTIS XN tom',D=3.725'(BEHIND PIPE) 4-1/2"TGB,12.6#,L-80,.0152 bpf,D=3.958' 804$' 8049' —14-1/2"WLEG(BOUND PIPE) C 5/8"CSG,47#,L-80,.0732 bpf, =8.681" 8484'__` 8642.--1-1E0.43 TT LOGGED 05/64/931 9- D 13-1/2"LNR 9.3#,L-80-JT1,.0087 bpf,Q=2.992' —j 9145' f PERFORATION WAWA RY 1.1• we' 8710" --1 CALCULATED TOC • REF LOG: BI-CS BHC'A 07/25/82 �.1. 1111 ANGLE AT TOP PERF:16'@9030 #44,, $'•1�$ 9130' H3-1/2"EV OTREV E RUG(10/02/15) Note:Refer to Production 08 for historical pert data V 9146' HTEN GLIDE SHOE,D=2.992' SEE SPF INTERVAL Opn/Sgz SHOT SQZ 3-3/8" 4 9027-9030 S 08/22/96 04/04/99 2" 6 9030-9035 C 05/11/14 3-3/8" 4 9046-9134 S 08122196 04/04/99 I 2-1/2" 4 9143-9153 C 01/05/01 2-1/2" 4 9153-9173 C 01/05/01 I 2-1/8" 6 9155-9175 C 08/25/99 3-3/8" 6 9165-9192 C 08/31/96 I PBTD --1 9237' ♦A���AA 111111111M - 1.1.1.1.1.1.1.1.1 7"LNR,29#,L-80,.0371 bpf,Q=6.184" — 92$0' � DATE REV BY COHABITS (ATE REV BY CONVENTS PRUDHOE BAY LINT 07/12/82 INITIAL COMPLETION 05/13/14 JS/JM.7 ADPERFS(05/11/14) WELL C-21 04/04/99 NORDIC 3-112"SCAB LM 10/08/15 NLW/JND SET EVOTREVE PLUG(10/02/15) PERMIT No: 1820810 03/14106 N3S RWO API No: 50-029-20753-00 07/22/08 KB/JND GLV C/O(07/20/08) SEC 19,T11N,R14E,884'SNL&1523'WE!_ — 08/29/12 DJS/JND GLV CIO(08/27/12) 03/20/14 RB/JND TREE 00(03/18/14) BP Exploration(Alaska) TREE='. WELLHEAD=_ MCEVOY PROtOSED C-2 1 A NOTES:***CHROME TBG*** R �7 G ACTUATOR ET( - 6 I -' I 24 --14-1/2"X 3-1/2 XO,D;2.992" i CNCB.ELEV= 67.5' --� BF.EI.EV= 34.6' _ KOP= 6800' , 2222' H3-1/2"HES X NP,D=2.813 Max Angle= •©_' Ctum MU Datum TVD= 8800'SS � 2599' 9-5/8"DV F (R 4-1/2"TBG,12.6#,13CR TC11, - 24' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE .0152 bpi,D=3.958" / 4 3092 3092 1 MMG DOME RK 16 08/27/12 13-3/8"CSG,72#,L-80, RS,D=12.347" ---I 2670' 3 5196 5196 1 MMG DOME RK 20 08/27/12 MRS, I. 2 6794 6792 9 MMG DMY RIC 0 07/20/08 1 7665 7606 25 MMG DMY RK 0 07/20/08 Minimum ID = 2.75" @ 7824" 3-1/2" HES BXP XN NIPPLE 1 I 7723' -13-1rz'HES XNP,ID=2.813" 7744' -13-1/2"X 4-1/2"XO,D=2.950" 7745' -19-518"X 4-1/2"BKR S-3 PKR,D=3.875' `-----1 7751' H4-112"X 3-1/2"XO,D=2.950" 7771' H 3-1/2"HES X NP,D=2.813" u I 7824' H3-1/2"HES BXPXN NP,D=2.75' 3-1/2"TBG,92#,13CR VAM --I 7847' I-7845" H3-1/2"X 4-1/2'XO,D=2.992"_ TOP,.0087 bpf,D=2.992" 7857' 1-15-1/2"TBG STUB(03/06/06) 5-112"TBG,17#,L-80,0232 bpf,D=4.892" -I 7884' --------------1 T�1' H4-1/2"MULE SHOE D=3.958" 8"x Tx 112'SLP SEGMENT(FOR PHOTOS,SEE H UNKNOW N. X [--784-1--19-5/8"OTIS F D=4.00" RWO FLE 3/15/06-COULD BE N 1 OF 2 LOC.) / ` r BOT LNR HGR W/TACK SLV -I 7968' 'fix , 7965' -4-1/2"OTIS X NP,D=3.813' 7"LNR,26#,L-80,.0383 bpf,D=6.276" -I 7982' ' • X 7991' H3.75"BKR DEPLOYMENT SLV,D=3.00" ' I 8-14-1/2"OTIS XN NP,D=3.725"(BEEN)PIPE)4 I4-1/2"TGB,12.6#,L-80,.0152 bpf,D=3.958"H 8048' ` 8049• N4-112"WLEG(BBMFiD PIPE) 9-5/8"CSG,47#,L-80,.0732 bpf,0=8.681' - 8484' J 8042' -1—ELMD TT LOGGED 05/04/93 TOP OF 2-3/8'LNR/CMT(_/ /-__) -{ -$930' I ( 8930' H-"DEPLOY.0 IT SLV,D xxx"BKR PACKER WHIPSTOCK(WOW Y) -I -8960' MLLOUTwraow(C-21A) -8960'- 8970' 3-1/2"OR,9.3#,L-80-JTI,.0087 bpf,D=2.992' -I -8960' 7"LNR,29#,L-80,.0371 bpf,D=6.184" -I -8960' PERFORATION SI LNARY REF LOG: ON_/_/_ ANGLE AT TOP PERF:_•@ Note:Refer to Ptoduction 013 for historical perf data111 TBD H PUP JT w IRA TAG SIZE SPF INTERVAL Opn/Sqz SHOT SOZ PBTD -1 2-3/8'LW,X.X#,L-80 STL,.0039 bpf,ID=1.99X' --I 11975' DATE REV BY C OMIVENTS DATE FEV BY COMvENTS PRUDHOE BAY UNIT 07/12/82 INITIAL COMPLETION WELL: C-21A 04/04/98 NORDIC 3-1/2"SCAB LNR FERMT No: 03/14/06 Ms RWO AR No: 50-029-20753-01 XX/XX/XX CTO(C-21A) SEC 19,T11N,R14E,884'FM_&1523'FEL 10/29/15 JMD BOLT PROPOSED BP Exploration(Alaska) ! • . 1 1 i i 1 ..M.. \\t\\110, I , , 1 , 1 IA P°' S U h . 1 ,a p" k ' '...... 1 Ei E a Uf U 11 1 a n 6 6 10:0 .. - *06 iI :0 1 � AYfwffv� r< j ), 1� I i 3g f. 1 Y 2 < O i s •t i i i _ t 1 O w I i'',01- 1 1 0 V �-� 1Ur i ,.II ..� �. I u_ „.A.. ,,-_ 1 Nil. i 1 . g MEI, r i O I I'M• I =11 I E 1 Q3 m v � a.,,,a,s.e... — I 1 V 031 I__ 10\ — R 1 cc . I 1 \ io . a < 1 U 1 .I zr 1 \ W 1 MI 1 MI • • ,, 1 f \ Imp 1 LLI Ce 0'°1' ' • Y m . - \ 1 NZ W U: •• uQ ■r , 0 L. i, , 1 4, Zq , 3 U .., i., 1 U o E m t',' °*� i _ \ 1 N a 1. ii U \ I I i §Pti , -8? : '1 _ ^ _ i .. Z f h -' ' , _ �tiIlk� MI : --...... -i O 3 I s im n � _3 is : o U I ' E u; cc I i °E U5 1 1 - PPM a I II I ..I -1 1 i. vimINI S • I Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geolo istt in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist A`J =. work) the initial reviewer will cross out that erroneous entry and initial then / it on both copies of the Form 10-403 (AOGCC's and operator's copies). v Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) V � 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. viS Ogg k WELL LOG TRANSMITTAL FCC E IV ED tau v32015 AO GCC PROACTIVE DIAGNOSTIC SERVICES, INC. DATA LOGGED A /'l/20155 M.K.BENDER To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2-1 900 Benson Blvd. Anchorage, AK 99508 aancpdc@bp.com and SCANHE° ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 03-Oct-15 (run 1) C-21 BL/CD 50-029-20753-00 2) Signed : �r � r fir. ;� Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 Fax: (907)245-8952 E-MAIL: PDSANCHORAGE()MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx \`'t.2 D`61 • 2(012.5 WELL LOG TRANSMITTAL 1\10k �, 20,5 /40 PROACTIVE DIAGNOSTIC SERVICES, INC. SCC DATA LOGGED %l/4/201% K ETENDER To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2—1 900 Benson Blvd. Anchorage, AK 99508 SCANNED pancpdc@bp.com and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 04-Oct-15 (run 2) C-21 BL/CD 50-029-20753-00 2) Signed : '�-' ''./ Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_TIansmit.docx \Ic2'a13 k WELL LOG -rTIN ED Nov 0 3 2015 TRANSMITTAL PROACTIVE DIAGNOSTIC SERVICES, INC. DATA LOGGED /2015 K BENDER To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2—1 900 Benson Blvd. Anchorage, AK 99508 gancpdc@bp.com and SCANNED ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 04-Oct-15 (run 3) C-21 BL/CD 50-029-20753-00 2) Signed : / Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx 4.9 r 06- • 0 1M IP [IIIvco u Lir O ►. CV O L1 9 0 , nFN N c 0 f 11 aq Name 0 Z 1. OO E2 Y o `° v V V1 > E 0 U fp Q c cu � o .o -o GI Q ,_" 0 0 L in w inin Lo m O 0 La C v y CO y u Fr WOo 0 Q Q v Q , C O � � - N v m c @ 0 N Z W O N fn O fn J"' f6 i 0�m f- N N r CO w -O _.6 O_ N un 6; O f6 N Q Q1 a a:Y. Q OY O v E O >, CC 0 ~ 00000 .... a" v = 0' L J J J J J } W W W W W pOD O i� O p ..� H LL LL LL LL LL � N E - N J J J J J Q p C O 00 O) 01 < Z Z Z Z Z o o u 0) LL Ll. LL LL LL V Ql 65 a) tOl a G> O O 0 Z , a CD +-+ -6 ca V i)4 O O 0 a) C01 Y.r(( F 4J a, a.+ N (�' r�Q Qi O. F. > > C 'L = 2 V �? 2 Q 4, CO O� > r� co ... 0 U > aili cel 1.14 il, W a) ly W c' W U CO d 0 \� Q 'v t 0 U G E. Q $4). .'. `� Ni W V C3 0) PI 8 DI V2 W > ca 0 a Z « = a' O r. 0) Z 2" ay c-' w 2 ` >, >, � cil M p z z E E E 3 'F z a cam^, - N W E E E lY•\ a r W >, >, >, >, >, 2mmmmm Z 0 0 00 0 0 0 t t t s t V v a aU W 3 3 3 3 7 LL a a a a a �. @ C CC _ 0.0 `1 X cn C W N N W (O 0 'V co N in O O O G CO 0 O O O O O C O W # O O O O O _ al Q1 U 5 t0 t0 f/) •c > > X CO a Ea C4 U U U 0 0 grra a x > fa a° a o o 0 0 IN 0 0m to 0ICE ill N Moa ' ° o a P�) 3t N N N O) i[) - N O N O M - > ^ d N N N N N m N < O a) O) O) a E O p N N N N N �n 0 Q1 '' O O O O O C N O O O O O ` C N N )() O l[) v a+ ELI • 0 a 00 E fl v m 7. E v • o m CO i <u ti a w U X } o o co N Q 0 VD 0. F- a 0. 0 Ima( ~roject Well History File Cover lge XHVZE This page identifies those items that were not scanned during the initial production 'scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. / _ Well History File Identifier RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: [] Other, No/Type [] Other items scannable by large scanner OVERSIZED (Non,Scannable) [] Logs of vadous kinds [] Other BY: E~EVERLY ROBIN VINCENT~ARIA WINDY Project Proofing BY: BEVERLY ROBI~SHERYL MARIA WINDY. Scanning Preparation x 30 = BY: Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ NO III IIIIII1 11111111 ReScanned (individual page [special attentions] .~canning completed) RESCANNEDBY: BEVERLY ROBIN VINCEN'F SHERYL MARIA WINDY DATE; ~si General Notes or Comments about this file: Quality Checked 12110/02Rev3NOTScanned,wpd • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 August 22, 2011 SEp ? F 3 Mr. Tom Maunder RECEIV ED, Alaska Oil and Gas Conservation Commission 2Q1� 333 West 7 Avenue Anchorage, Alaska 99501 6 83 : w . e m ssi on Subject: Corrosion Inhibitor Treatments of GPB C -Pad Ancortrage Ti Dear Mr. Maunder, 1 Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) C -Pad 7/19/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal C -01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010 C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010 C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010 C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010 C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010 C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010 C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010 C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010 C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010 C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010 C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010 C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010 C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010 C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010 C -16B 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011 C -17B 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010 C -18B 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010 C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010 C -20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010 r> C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010 C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010 C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011 C -24A 2040580 500292081601 Sealed NA NA NA NA NA C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010 C -26A 1981450 500292083401 0.8 NA 0.8 NA 3.40 11/22/2010 C -278 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010 C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010 C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011 C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010 C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010 C -32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010 C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010 C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010 C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010 C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010 C -37B 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010 C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010 C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010 C-41A 2041880 500292238501 Sealed NA NA NA NA NA C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010 OPERABLE: C-21 (PTD #1820810) for Sustained casing pressure due to TxIA Comm Page 1 of 2 • Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Wednesday, July 23, 2008 12:58 PM ~~~ To: Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, GC3 Wellpad Lead; GPB, GC3 OTL; GPB, Area Mgr Central (GC1/3/FS3); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr Cc: Roschinger, Torin T.; Dean, James A; NSU, ADW Well Integrity Engineer Subject: OPERABLE: C-21 (PTD #1820810) for Sustained casing pressure due to TxIA Comm Follow Up Flag: Follow up Flag Status: Yellow Hi all, Well C-21 (PTD #1820810) passed a TIFL on 07/22/08 after dummying aft the gas lift valves proving integrity has been restored. The weil has been recfassifiied as Operable and may be rought on line when convenient far ,~ operations NUJ `./ :~ 6 20D8 From: NSU, ADW Well Integrity Engineer Sent: Sunday, July 13, 2008 8:46 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, GC3 Wellpad Lead; GPB, GC3 OTL; GPB, Area Mgr Central (GCl/3/fS3); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr Cc: Winslow, Jack L.; NSU, ADW Well Integrity Engineer; Dean, James A Subject: UNDER EVALUATION: C-21 (PTD #1820810) for Sustained casing pressure due to TxIA Comm Hi all, Well C-21 (PTD #1820810) has been found to have sustained casing pressure on the IA. The wellhead pressures were tubing/IA/OA equal to SSV/2290/0 psi on 07/03/08. Due to the constraint of not being able to bleed pressure down to the production system due to the shut-down, the diagnostic work took longer to complete. On 07/13/08, a TIFL failed on IA repressurization overnight confirming TxIA communication. The well has been reclassified as Under Evaluation and placed on a 28-day clock. Operations may allow the IA pressure to continue as is or may return the well to production once the facility is online. The plan forward for the well is as follows: 1. DHD: TIFL -FAILED 2. Slickline: Set dummy gas lift valves 4. DHD: re-TIFL post dummy gas lift valves 10/27/2008 OPERABLE: C-21 (PTD #1820810) for Sustained casing pressure due to TxIA Comm Page 2 of 2 • • A TIO plot and wellbore schematic have been included for reference. Please calf with any questions. Thank you, ,,~nna 1~ude, ~? E. Well Integrity Caardinatar GPB Wel)s Graup Phane: (907) 659-5102 Pager: (907) 659-5100 x1154 10/2'7/2008 dC O T ~ i ~ i ~ i 4 ~ I O O C'7 ~ i I'ti I O O O O CM O O U7 ^ ^ ^ ^ ^ s ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ° 0 0 a o ~ a; O O {~Y} 0 ~ I ~ I I a 0 o `r' ct °a °o o a cv TREE = 6" MCEV OY WELLHEAD = MCEVOY ACTUATOR = OTIS KB. ELEV - 67.5' ~,..w. BF. ELEV = ,.,n. -._,._r. 34.6' KOP _ .. 6800' Max Angle = 27 @ 7500' Datum MD = 9021' Datum N D = 8800' S5 ~4-112" TBG. 12.6#, 13CRTCII, ID= 3.958" 13-318" CSG, 72#, L-80, BTRS, ID = 12.347" • C-21 NOTES: *** CHROME TBG *** 24' i-~4-112" X 3-112 XO, ID = 2.992" 24' 2669` Minimum ID = 2,75" @ 7824" 3-112" HES BXP XN NIPPLE 3-112" TBG, 9.2#, 13CR VAM TOP, .0087 bpf, ID = 2.992" 5-112" TBG, 17#, L-80, 0232 bpf, ID = 4.892" (-1 7$$4 8"x2"x1/2" SLIP SEGMENT (FOR PHOTOS, SEE UNKN01 RWO FILE 3115/06 - COULD BE EN 1 OF 2 LOC.} ~-- 7" BOT LNR HGR W! TIEBACK SLV 7967' 4-112" TGB, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 804$' 9-518" CSG, 47#, L-80, .0732 bpf: ID = 8.681" $4$4' 3-112" LNR, 9.3#, L-80-JT1, .0087 bpf, ID = 2.992" 9145' PERFORATION SUMMRRY REF LOG: BHCS BHCA 07.`25182 ANGLE AT TOP PERF: 16 ~ 9027' Note: Refer to Production DB for hlstarica[ pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 4 9027 - 9030*" S 08/22196 3-318" 4 9046 - 9134** S 08!22/96 2-1;2" 4 9143 - 9153 O 01/05/01 2-1l2" 4 9153 - 9173 O 01105/01 2-1i8" 6 9155 - 9175 O 08/25/99 3-318" 6 9165 - 9192 O 08/31/96 **BEHIND SCAB LNR {04106199) PBTD 9237' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 92$0' 9146` ~--{ TIW GUIDE SHOE. ID = 2.992" DATE REV BY COMMENTS O7t12182 ORIGINAL COMPLETION 04!04(99 NORDIC 3-1I2" SCAB LNR 03/14/06 N3S RWO 03123;06 DAV/PJC GLV CIO 04%10.'06 BMcUPA ANNULUS FISH (03!15;06} 05!20106 BMcL1TLH DRLG DRAFT CORRECTHJNS DATE I REV BY ~ COMMENTS 7101106 KSBIPAG GLV Cl0 PRUDHOE BAY UNIT WELL: G21 PERMIT No: 1820810 API No: 50-029-20753-00 SEC 19. T11N, Ri4E. 884' SNL & 1523' WEL BP Exploraflon {Alaska) 222--~ 3-1/2" HES X NIP, ID = 2.813" 2598' 19-518" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3092 3092 1 MMG DOME RK 16 07!01/06 3 5196 5196 1 MMG DOME RK 16 07/01106 2 6794 6792 9 MMG DOME RK 16 07/01/06 1 7665 7606 25 MMG SO RK 22 07/01/06 ~~1 3-1I2" HES X NIP, ID = 2.813" 7744' 3-1/2" X 4-112" XO, ID = 2.950" 774$` 9-5/8" X 4-1i2" BKR S-3 PKR, ID = 3.875" 7751' 4-112" X 3-112'° XO, ID = 2.950" 7771 ` 3-1l2° HES X NIP, iD = 2.813" 7$24` 3-1 f2" HES BXP XN NIP, ID = 2.75" 7$45" 3-112" X 4-1l2" XO, ID = 2.992" 7$57" 5-1/2" TBG STUB (03106(06} 7$61` 4-112" MULE SHOE, ID = 3.958" 7914' 9-518'° OTIS PKR, ID = 4.00„ 7965` 4-112" OTiS X NIP, !D = 3.813' 79$1' ~ 3-314" BKR DEPLOYMENT SLV, ID = 3.00" $(j06' 4-112" OTIS XN NIP, ED = 3.725" {BEHIND PIPE) $049' 4-112" WLEG {BEHIND PIPE) 8042' ELMD TT LOGGED 05/04!93 $710' CALCULATED TOC STATE OF ALASKA a ALASKAe. AND GAS CONSERVATION CO_ISSION REPORT OF SUNDRY WELL OPERATIONSOiI& Gas Cons C '. A I. . ommlSSJon nCl/orage " 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage. Alaska 7. KB Elevation (ft): 8. Property Designation: ADL 028305 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Scab Liner Length Perforation Depth MD (ft): Perforation Depth TVD (ft): o Suspend !HI Repair Well !HI Pull Tubing 67.5' 9282 9119 9237 9076 80' 2669' 8484' 1313' 1155' t-<Et,;t:IVED 2 3 o Operation Shutdown o Plug Perforations o Perforate New Pool o Perforate o Stimulate o Waiver o Other o Re-Enter Suspended Well o Time Extension 4. Current Well Class: !HI Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number: 182-081 6. API Number: 50-029-20753-00-00 99519-6612 9. Well Name and Number: PBU C-21 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool feet feet Plugs (measured) None feet Junk (measured) None feet Size MD TVD Burst Collapse 20" x 30" 80' 80' 13-318" 2669' 2669' 4930 2670 9-5/8" 8484' 8359' 6870 4760 7" 7967' - 9280' 7881' - 9117' 7240 5410 3-1/2" 7991' - 9146' 7903' - 8988' 10160 10530 9143' - 9192' 8985' - 9032' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 3-1/2",9.2# 5-1/2", 17# 9-5/8" Otis packer; 9-5/8" x 4-1/2" Baker 'S-3' packer 13Cr80 L-80 7862' 7850' - 8049' 7914' 7745' Treatment description including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Oil-Bbl Tubin Pressure Re resentative Dail Gas-Mcf Water-Bbl 15. Well Class after proposed work: o Exploratory !HI Development 0 Service 16. Well Status after proposed work: !HI Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL est 0 my nowe ge. Sundry Number or N/A if C.O. Exempt: N/A o Copies of Logs and Surveys run !HI Daily Report of Well Operations o Well Schematic Diagram 17. Printed Name Terrie Hubble Signature ~ Form 10-404 Revised 04/2004 Title Technical Assistant Phone Page 1 of 8 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date I From - To Hours I Task , , oo:o~ ~ -06:~ -6.00 '-~;¿U 06:00 - 12:00 I 6.00 RIGU C-21 C-21 WORKOVER ~<..I.-~C'~ ~ ~ Code N PT Phase ._n__._n_u__ __ ..___.. _. ._._~.__ ---.----.-------.. PRE Moving rig components onto pad, including Rig camp. PRE Final rig up of rig and components. Pits, Pipeshed etc. Accept rig @ 12:00. Veco crew on location and pull BPV. Wait on fluids. Vac trucks unavailable due to Code Black at GC-2. WHP's = 0/010. DECOMP Rig maintenance and wait on fluids. Discuss with town setting TWC, and testing to 1000 psi to nipple down tree and nipple up BOPE and test. Waiver of planned scope granted. Call for Veco Lubricator and Cameron with TWC. 24 hr. notice to AOGCC of BOPE test given to Jeff Jones at 1530 hrs. Prepare to set and test TWC and N/D tree. Load pits with 250 Bbls of seawater. PJSM. PUMU lubricator and set TWC. Test TWC to 1000 psi from below. Pumped 41 bbls. seawater to catch fluid. Test good. LID lubricator. PJSM. N/D production tree. PJSM. N/U BOPE. Continue NU BOPE. Changed pipe rams to 3-1/2" x 6 VBR's. Test BOPE - LP 250 psi HP 3500 psi. Jeff Jones - AOGCC waived witnessing of test. Continue to NU BOPE. Energize Koomey unit. Function test and full body test to begin. LP 250 psi - HP 3500 psi. Pipe ram doors leaking, flange to kill line leaking. Tighten flange nuts, fill and bleed air from system. Trouble shoot BOPE equipment to try to find where pressure is bleeding down from. Losing 200 psi consistently in 5 minutes. Block and isolate BOPE components. Identify leak in gland nut of LDS. Safety stand down for 15 minutes to review pinch point safety discussion as presented at previous safety meeting. Start BOPE testing. DECOMP Leak in valve number 12 on choke manifold. Grease and repair same. Stab 5-1/2" test joint and continue BOPE testing per BP/AOGCC requirements. LP 250 psi - HP 3500 psi. BOPE test completed satisfactorily. DECOMP Drain BOPE stack. Pull and LID pitcher nipple. Nipple up shooting flange. PU/MU lubricator. Pull TWC. SITP after pull TWC = 120 psi. lAP = 0 psi. Hole out of balance due to 41 bbl's seawater pumped down IA to catch fluid and PIT TWC from bottom side. Flowed back 5 bbls. diesel to pits. Line up choke manifold to bleed tbg. to tiger tank. Hardline connection and riser in tiger tank frozen. Verified Tiger tank inlet riser full of ice. Called well support to deliver tiger tank that is ice free. Wait on well support to deliver ice free tiger tank and connect hardline. Well support delivered new tiger tank. Changeout frozen hose in well support hardline connection to tiger tank and blowout with steam. Used rig hose. Bleed tbg. pressure off to 0 psi. taking returns to tiger tank. Flowed -20 bbls. diesel to tank. LID lubricator & TWC. Line up circulating equipment to circulate well taking returns to tiger tank. Circulate well @ 2 bpm @ 90 psi. taking returns to tiger tank. 40 bbls away to get returns to tank. Increase rate to 4 bpm @ 3/2/2006 P P 12:00 - 17:00 5.00 WHSUR C 17:00 - 19:00 2.00 WHSUR C DECOMP 19:00 - 21 :30 2.50 WHSUR P DECOMP 21 :30 - 23:00 1.50 WHSUR P DECOMP 23:00 - 00:00 1.00 BOPSU P DECOMP 3/3/2006 00:00 - 06:00 6.00 BOPSU P DECOMP 06:00 - 08:30 2.50 BOPSU DECOMP 08:30 - 09:30 1.00 BOPSU DECOMP 09:30 - 13:00 3.50 BOPSU P DECOMP 13:00 - 16:30 3.50 BOPSU P 16:30 - 00:00 7.50 BOPSU P 3/4/2006 00:00 - 00:30 0.50 KILL P DECOMP 00:30 - 03:00 2.50 KILL N WAIT DECOMP 03:00 - 03:30 0.50 KILL N WAIT DECOMP 03:30 - 04:30 1.00 KILL P DECOMP 04:30 - 05:00 0.50 KILL P DECOMP 05:00 - 06:00 1.00 KILL P DECOMP Start: 3/2/2006 Rig Release: Rig Number: Spud Date: 7/13/1982 End: Description of Operations Printed: 3/20/2006 12: 1 0: 13 PM BP EXPLORATION Operations Summary Report Page 2 of 8 Legal Well Name: C-21 Common Well Name: C-21 Spud Date: 7/13/1982 Event Name: WORKOVER Start: 3/2/2006 End: Contractor Name: Rig Release: Rig Name: Rig Number: I NPT I Date From - To Hours Task :Code: Phase Description of Operations ...._._n_._...._ .____.__ .------- I ----..---- --. .. n_____.____.... 3/4/2006 05:00 - 06:00 1.00 KILL P DECOMP 350 psi. Increase rate to 4.5 bpm @ 420 psi. Pump rate 4.5 bpm @ 90 psi w/230 bbls. away. 06:00 - 08:00 2.00 KILL P DECOMP 600 bbls seawater circulated down tubing and returns from annulus. Final circulation pressure of 340 psi @ 4.5 bpm. Shut down and monitor well. WHP TIIA I OA of 0 I 0 I 0 psi. Pit volume of 250 bbls seawater. PJSM with rig crew and SLB slickline. 08:00 - 12:00 4.00 PULL P DECOMP PJSM. PUMU SLB slickline BOP and lubricator equipment to rig floor. Rig up lower sheave, take control of wire, MU Tool String, 4 1/2" equalizing prong with pump bailer, centralizer, spangs, oil jars, 8' of weight bar. Stab on to 10 riser, PT to 250 psi and 2500 psi, OK. Bleed and open well to 0 psi. RIH with Equalizing prong Toolstring. No change in pressure when equalizing plug. 4 1/2" XX plug at 7794' SLM. POH. Scale in bailer. 12:00 - 14:30 2.50 PULL P DECOMP PUMU slickline toolstring,4 1/2" GS pinned with brass, spangs, 8 ' of weight bar. Latch into XX plug at 7795' SLM. Pull 1800 Ibs, 2 jar licks, appear to be free. RU pump 4 bbls down kill line, Tbg IIA pressure to 650 psi and holding. to pull 4 1/2" XX plug. RIH and attempt to latch plug. Unable to do so. POH 14:30 - 18:30 4.00 PULL P DECOMP Break out SL tool string. GS sheared. MU equalizing prong assembly with bailer and RBIH to equalize again. Work prong and bailer on plug and POH. Good indication (rings on prong and centralizer), small amount of scale recovered. Make up 4 1/2" GS pinned with steel, spangs, oil jars, 8' stem, RIH. Latch plug. Plug moved down hole. PU and work plug between TOL and X nipple. 18:30 - 19:30 1.00 PULL P DECOMP Halt tool movement activity and wait for fluid equalization rate past plug to decrease. 19:30 - 19:45 0.25 PULL P DECOMP PU and work plug between TOL and X nipple. Plug appears to have come through nipple. POH wltool string. 19:45 - 20:15 0.50 PULL P DECOMP Bleed off and break off lubricator. XX plug retrieved. Filling hole w/seawater. Filled hole w/90 bbls. seawater. Bullhead 30 bbls. seawater into perfs. @ 1.5 bpm @ 425 psi to flush any gas in hole below plug into perfs. At 30 bbls. away pump psi - 550 psi. 20:15 - 23:00 2.75 PULL P DECOMP Rig down SLB slickline unit and tools. Keeping hole full while rigging down slickline unit and rigging up e-line unit. Fluid losses = 20 bbls./hr. Ordered 250 bbls heated seawater. 23:00 - 00:00 1.00 PULL P DECOMP PJSM. MIRU SLB e-line unit. Keeping hole full of seawater wlfluid losses at 35-37 bbls./hr. 3/5/2006 00:00 - 04:00 4.00 PULL P DECOMP PU e-line BOP and lubricator equipment to rig floor. MU 10ft. riser to top of shooting flange. RU lower sheave. Take control of wire. PU lubricator wlgrease head. PUMU tool string. Stab lubricator onto 10ft. riser. PIT lubricator to 250 psi LP and 1500 psi HP wlrig BOP test pump. Tested against top of blind rams. Pressure leakoff to 900 psi and held. Raised pressure again to 1500 psi. Leakoff to 900 psi and held. Break off lubricator. Clear rig floor of non-essential personnel. MU jet cutter to tool string. Stab lubricator on e-line BOP. 04:00 - 05:30 1.50 PULL P DECOMP RIH with 4.15" O.D. e-line jet cutter to cut 5-1/2", 17# tubing in middle of first full joint above packer set @ 7914'. Keeping Printed: 3/20/2006 12: 1 0: 13 PM BP EXPLORATION Operations Summary Report Page 3 of 8 Legal Well Name: C-21 Common Well Name: C-21 Spud Date: 7/13/1982 Event Name: WORKOVER Start: 3/212006 End: Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours ; Task ¡COde N~T_lpha~~ Description of Operations . ....u_ _n____. 3/5/2006 04:00 - 05:30 1.50 PULL P I DECOMP hole full of seawater with charge pump. Fluid losses = 35-37 bbls./hr. Pit volume at 0500 hrs. = 108 bbls. 05:30 - 06:00 0.50 PULL P I DECOMP Correlate jet cutter depth to leak detection log dated 5/3/2005 ! and completion tubing tally. Stop depth @ 7849.6' placing cutter head at 7857' correlated to jewelry log dated 5/4/93. Cleared rig floor and pipe shed of all non-essential personnel prior to detonating jet cutter. Detonated cutter head at 0615 hrs. Good line action and weight indicated successful detonation of cutter. Cut tbg at 7857' with deviation of +1- 25 degrees. 06:00 - 09:00 3.00 PULL P DECOMP POH with cutter. Stop at 1000 ffs, SLB crew change. PJSM with rig crew and SLB and discuss procedures for pulling cutter to surface, securing well, and rig down. Stop cutter at 200' and clear rig floor of all non-essential personnel. POH into lubricator, secure well, break out inspect cutter (properly detonated), and lay down SLB e-line equipment. 09:00 - 1 0:30 1.50 PULL P DECOMP Keeping hole full by pumping across the top, losses @ 28 bbllhr. ND shooting flange, NU pitching nipple. PUMU landing joint, SLB control line spooler. 10:30 - 17:30 7.00 PULL P DECOMP PJSM. RIH w/3 1/2" DP landing joint with head pin and TIW valve, and XO to 7" IJ4S hanger thread. Screw into hanger with 7 1/2 turns. Back out LDS. PU tbg and hanger with 11 OK. Pull hanger to rig floor. Fill hole with 20 bbls of seawater. Keep hole full by circulating across the top of the hole. Rig up Air Slips with 5 1/2" inserts. Reconfigure tong dies to break out 7.375" OD XO (below hanger) from top of 51/2" tubing. Slips set too high. PU out of air slips, lower pipe 6 inches and set slips. When set slips, pipe crushed, and shattered 3 of the 4 inserts. in the Air Slips. PU slightly and fish out pieces of slip inserts. Remove air slips. PU and set manual slips with 5 1/2" dog collar. Rig up snub line to prevent twisting off top of Tbg. Break out and lay down tubing hanger, stab TIW valve with head pin. MU 5 1/2" elevators. Break out and lay down the damaged joint of tubing. 17:30 - 18:00 0.50 PULL P DECOMP Disassemble 5 1/2" inserts from air slips. Piece together to see what was missing. 2 pieces at worst case being 4" long x 21/2" wide x 1/2" thick lost in the hole. 18:00 - 00:00 6.00 PULL P DECOMP POH and lay down 51/2" tubing and spool control line. 2 metal bands on control line at surface. Rig spotted off center of hole and causing control line clamps to hang up on rotary busings as they come to surface. Rig being off center also causing major difficulties in setting slips each time. 3/6/2006 00:00 - 02:15 2.25 PULL P DECOMP Pipe hanging up at every casing collar. PUW = 75K SOW = 50K. Working pipe to 35K over PUW and back to SOW and pulling -15 ft./minute with pipe dragging intermittently while pulling. Fluid losses = 18-20 bbls.hr. Hydraulic tubing tongs sheared low gear. Changed out broken ones with different set of tongs from Nabors shop in Deadhorse. 02:15 - 04:00 1.75 PULL P DECOMP 49 jts. out. Stop filling hole at 48 jts. out to allow fluid to fall below BOP stack and wellhead to enhance possibility of seeing broken slip segments on top of SSSV. Did not see broken slip segments in BOP stack nor on top of SSSV. Break out and LD SSSV. SSSV O.D. = 6.08". Recovered 24 rubber/controlline Printed: 3/20/2006 12: 1 0: 13 PM BP EXPLORATION Operations Summary Report Page 4 of 8 Legal Well Name: C-21 Common Well Name: C-21 Spud Date: 7/13/1982 Event Name: WORKOVER Start: 3/2/2006 End: Contractor Name: Rig Release: Rig Name: Rig Number: From - To Hours Task I Code NPT Phase Description of Operations ....-.--.--- 3/6/2006 02:15 - 04:00 1.75 PULL P DECOMP cllampslcentralizers wlpins and 5 SS bands. Old reports indicate 26 were run. Resume keeping hole full with charge pump. Fluid losses = 18-20 bbls./hr. Continue POH with 5-1/2" Tbg. PUW = 51 K Pipe still dragging at casing collars. Pulling 25K over PUW and working pipe to free pipe. 04:00 - 06:00 2.00 PULL P DECOMP 58 jts. out. Pipe intermittently sticking at casing collars. PUW = 50K. Pulling 25K over PUW and working pipe to free pipe. Fluid losses = 18-20 bbls./hr. 06:00 - 10:00 4.00 PULL P DECOMP POH to joint #72. Observe wellbore as pull GLM # 13 into csg spool. No sign of metal slips. Rubber control line protector stripped around GLM. Work pipe to try to recover rubber protector. Unable to recover, rubber still in hole. Top of GLM scarred and gouged with obvious signs of dragging metal slips pieces by. Significant gouges at top, and lesser down the length of the mandrel. Caliper GLM and Tbg collars. GLM- 7.67" OD, collars - 6.14" OD. Inspect collars on all 72 joints POH, inspect SSSV and no sign of metal damage. 10:00 - 14:00 4.00 PULL P DECOMP Continue POH with 5 1/2" Tbg. Metal andlor rubber grabbing occasionally. Work pipe and continue. Keeping hole full by pumping across the top with charge pump. Losses @ 18 - 20 bbls per hour. POH to GLM # 12. Work into stack and pull above rotary table. Mandrel scarred and gouged similar to previous mandrel. 14:00 - 18:00 4.00 PULL P DECOMP POH laying down 5 1/2" Tbg. Appear to have worked 1 ea 5.5" x 7" control line protector into tubing spool. Break out and lay down GLM's #11 - #9. GLM #11 deeply gouged at connection bottom of upper pup joint and top of GLM. Pipe and Tool joint with divet. GLM #9 and #10 with minimal damage. GLM's continue to hang up and have to massage them to surface. 137 of 175 jts of 512" Tbg OOH, 5 of 14 GLM's OOH. Losses at 15 - 18 bbls/hr. 18:00 - 23:00 5.00 PULL P DECOMP POH laying down 5 1/2" Tbg keeping hole full pumping across top with charge pump. Fluid losses = 18-20 bbls./hr. Reciprocating pipe and occasionally rotating 180 degrees to free up drag. max. overpull was 25K during recovery operations post 0600 hrs. Recovered 176 full jts. 5-1/2" tubing, 100% control line, 1 ea. 5-1/2" SSSV, 13 ea. 5-1/2" GLM's, 1ea. 5-1/2" sliding sleeve and cutoff jt. No metal junk recovered. All GLM's scarred heavily from metal junk dragging by. Sliding sleeve showed no visible signs of scarring from metal junk dragging by it. Jet cut on tubing was clean with no hangnails present. Length of cut jt. recovered - 21.94', leaving 20.39' of tubing stub looking up according to an original completion pipe tally indicating first full jt. above packer to be 42.33' in length. O.D. of jet cut calipers out to 6.00" and shows no measurable ovality. Pictures of jet cut e-mailed to workover engineer and wellsite leaders. 23:00 - 00:00 1.00 PULL P DECOMP Clear & clean rig floor. Rig down 5-1/2" tubing handling tools. Stop hole fill to allow fluid level to fall below BOPE stack and allow visible inspection of stack internals and possibly locate junk from broken slip dies or completion debris. No visible junk in BOPE stack. Prepare to wash out BOPE stack with "Johnny Whacker" to ensure no junk from broken slip dies andlor rubber Printed: 3/20/2006 12:10:13 PM Pa BP EXPLORATION Operations Summary Report Start: Rig Release: Rig Number: Phase DECOMP controllinelturbolators from completion are present. DECOMP Continue rig down 5-1/2" tubing handling tools. Wash out BOPE stack with "Johnny Whacker" to ensure no junk from broken slip dies and/or rubber controllinelturbolators from completion are present. DECOMP Rig up floor and pipe handling tools to run 3-1/2" DP, drill collars and BHA#1. DECOMP PUMU Baker fishing tool BHA #1: 5.5" Dress off Shoe, catchers below 7.875" Reverse Circulating Basket, 2 ea boot baskets, 95/8" Csg. Scraber, Bit Sub, Bumper Sub, Oil Jars, 4 3/4" Drill collars. RIH with BHA #1. 154 jts. in hole. RIH w/BHA #1 and 241 jts. 3-1/2" DP. Establish parameters. PUW = 85K -- SOW = 85K. P/U jt. #242 and soft tag top of tubing stub at 7857' with 2000# down wt. 22 ft. in on jl. #242. Rig up floor and lines to reverse circulate 33 bbl. Hi-Vis sweep. Complete rigging up lines and floor to reverse circulate hole. Establish circulating parameters @ 2 BPM @ 100 psi. Increased pump rate to 4.0 BPM @ 450 psi. Losses = 40 BPH. Decreased pump rate to 3 BPM @ 300 psi. Losses 25-27 BPH. Recovered sweep to pill pit. No junk or debris recovered in sweep. DECOMP R/U Lil Red to increase Circulating Rate to 7-8 BPM when combined with Rig Pump. Rigging up lines to circulate ball into jet sub and hoover off top of 5-1/2" tubing stub. DECOMP Drop Ball and wait for ball to engage Jet Reverse Circulating Basket Seat. Slowly lower string until weight drops -2,000 Ibs then Yo-Yo in 5' cycles for 15 minutes while circulating at 2-BPM wI Rig Pump and 5-BPM wI Lil Red. Clear and clean Rig Floor and RID Lil Red. BIO Head Pin and LID 2-joints DP. Service Rig. POH and SIB 3-1/2" DP in Derrick. 58-Stands out and SID to changeout dies in Rig Tongs. Changeout dies in Rig Tongs. Resume POH and SIB 3-1/2" DP in Derrick. SIB DCs in Derrick. Breakout and LID BHAand empty Junk Basket and boot baskets Recovered 1 ea. composite control line clamp including keeper pin and -1 gallon of scale. Clear and clean rig floor. Prep to PUMU BHA #2. PUMU BHA #2. RIH w/BHA #2 on 3-1/2" DP. Continue RIH w/BHA#2 on 3-1/2" DP, find top of tubing stub @ 7,858' vs 7,857' tally of recovered pipe. Sting 3-5/8" junk basket thru top of 5-1/2" tubing stub, stack out on Guide Shoe and Shear Pins shear wI 9,000 Ibs. Continue RIH to top of 3-1/2" Baker Deployment Sleeve and soft tag it @ 7,994' Nabors 3S RKB vs Tally depth of 7,992'. Note: Rig spotted off center of hole continues to cause inefficiencies in trip times and extra effort to engage rotary slips each time they are set. DECOMP P/U 3-1/2" DP Pup Joint and replace DP Jt #242 to improve safe handling of circulating line and valve. Reverse Circulate C-21 C-21 WORKOVER Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date I From - To ' Hours I Task ¡ Code NPT ; 3/6/2006 3/7/2006 23:00 - 00:00 00:00 - 02:00 1.00 PULL P 2.00 CLEAN P 02:00 - 06:00 4.00 CLEAN P 06:00 - 09:00 3.00 CLEAN P 09:00 - 06:00 21.00 CLEAN P DECOMP 06:00 - 23:00 17.00 CLEAN P DECOMP 23:00 - 00:00 1.00 CLEAN P DECOMP 3/8/2006 00:00 - 01 :00 1.00 CLEAN P DECOMP 01 :00 - 04:00 3.00 CLEAN P DECOMP 04:00 - 06:00 1.50 CLEAN P 06:00 - 07:00 1.00 CLEAN P 07:00 - 08:30 1.50 CLEAN P DECOMP 08:30 - 09:00 0.50 CLEAN P DECOMP 09:00 - 13:30 4.50 CLEAN P DECOMP 13:30 - 14:15 0.75 CLEAN P DECOMP 14:15 - 18:00 3.75 CLEAN P DECOMP 18:00 - 19:00 1.00 CLEAN P DECOMP 19:00 - 19:30 0.50 CLEAN P DECOMP 19:30 - 23:30 4.00 CLEAN P DECOMP 23:30 - 00:00 0.50 CLEAN P DECOMP 3/9/2006 00:00 - 06:30 6.50 CLEAN P DECOMP 06:30 - 08:00 1 .50 CLEAN P 3/2/2006 Spud Date: 7/13/1982 End: Description of Operations ..... _________.____n.__.. Printed: 3/20/2006 12: 1 0: 13 PM Page 6 of 8 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date -.----...--- 3/9/2006 C-21 C-21 WORKOVER Start: 3/2/2006 Rig Release: Rig Number: Spud Date: 7/13/1982 End: , ! ¡ Code! NPT: Phase I From - To t Hours' Task 0~:30 -~~:oo f 1.50' CLEAN P 08'00 - 09,30 I 150 I CLEAN P 09:30 - 17:30 8.00 CLEAN P 17:30 - 21 :00 3.50 CLEAN P 21 :00 - 21 :30 0.50 CLEAN P 21:30 - 22:15 0.75 CLEAN P 22:15 - 00:00 1.75 CLEAN P 3/10/2006 00:00 - 06:00 6.00 CLEAN P 06:00 - 09:00 3.00 CLEAN P 09:00 - 11 :00 2.00 DHB P 3/11/2006 11 :00 - 19:30 8.50 BOPSU P 19:30 - 20:30 20:30 - 23:30 1.00 BOPSU P 3.00 WHSUR P 23:30 - 00:00 0.50 WHSUR P 00:00 - 02:30 2.50 WHSUR P 02:30 - 05:00 05:00 - 06:00 2.50 WHSUR N 1.00 WHSUR P 06:00 - 10:30 4.50 CLEAN P Description of Operations ---.-- DECOMP DP volume of 2,300 Strokes = -54 Bbls. DECOMP Break off Circulating Line, drop 5/8" SS Ball into TIW, connect Circulating Line and realign valves to pump ball on seat. Circulated Bottoms Up and didn't see indication that we had pushed Ball ahead and onto seat. DECOMP POH and SIB 3-1/2" DP in Derrick. DECOMP LID DCs and BHA #2. No debris or junk recovered in reverse circ. junk basket or boot baskets. Ball was found to be on seat as per normal ops. Clear and clean rig floor. Prep rig floor and handling tools to PUMU Halco 9-5/8" RBP. PUMU 9-5/8" Halco RBP. RIH w/9-5/8" Halco RBP on 3-1/2" DP. Keeping hole full circulating over the top with rig charge pump. DECOMP Set RBP @ 7,806'. Release from RBP and POH w/5-stands of DP. Pressure test Casing to 3,500 psi and hold for 30-minutes while charting same. Good, rock-solid test. DECOMP P/U Halliburton RTTS Storm Packer and set one stand below Rig Floor. Set Packer and release DP from RTTS and POH to prepare for BOPE test and subsequent replacement of Tubing I Mandrel Packoffs. DECOMP I PJSM. P/U Test Plug and install in BOP on top of Tubing Mandrel. Pull and re-run Test Plug twice to adjust seal retainer to cause seal to seat against tubing bowl. Test BOPE per AOGCC and BP requirements: 250 psi low, 3,500 psi high. DECOMP Rig down BOPE test equipment. DECOMP PJSM. PUMU 9-5/8" casing mandrel/packing retreiving tool on jt. of 3-1/2" DP. J retreiving tool into packoff and attempt to pull mandrel and packing. Pulled max. pull wlboth tuggers. No movement noted. Latched onto DP wtraveling block and elevators. Traveling Block assembly hanging weight = 10K#. Pulled 50K# tension over traveling block hanging weight wIno sign of movement in mandrel. Wrapped wellhead with herculite and applied steam to wellhead to warm up same. DECOMP While applying steam heat to wellhead, pulled 60K# over traveling blocks hanging weight. Found that one LDS was difficult to back out. Attempted to remove the recalcitrant LDS to ascertain if it is intact before proceeding. Unable to remove LDS. Called workover superintendent to discuss options and path forward. Agreement made to re-energize casing head packing, plastic pack and retest. If test good, move on to next step in plan forward. DECOMP Repack and re-energize casing head packing. PIT to 5000 psi for 30 minutes. Good test. LID casing packing mandrel pulling tool. P/U and set wear ring. HMAN DECOMP Thaw frozen choke line. DECOMP PUMU storm packer retreiving tool. RIH w/2 jts. 3-1/2" DP. Sting into packer and open storm valve. Verify no pressure trapped under packer. POH LID RTTS packer and storm valve. DECOMP RIH w/5-stands 3-1/2" DP from Derrick to grab, release, and retrieve RBP. RBP released enough to allow fluid equalization, but need to P/U additional joint of DP in order to work RBP. DECOMP DECOMP DECOMP DECOMP Printed: 3/20/2006 12: 1 0: 13 PM .. .-.-----.... ._.._......1... ..______m 3/11/2006 06:00 - 10:30 10:30 - 15:30 15:30 - 18:00 18:00 - 00:00 3/12/2006 00:00 - 01 :30 01 :30 - 02:30 02:30 - 03:00 03:00 - 11 :30 11:30 -12:30 12:30 - 18:00 Page 7 of 8 BP EXPLORATION Operations Summary Report DECOMP Bullheaded 30-Bbls and lost 35-Bbls before RBP worked free @ 1000-hrs, but wouldn't go back down. Manage to get RBP moving downhole, so RIH to 7,810' (+1-), then POH 20' and prepare to circulate Surface-to-Surface. Circulate Surface-to-Surface 2-BPM @ 240 psi for 23,000 strokes or 530-Bbls. Saw noevidence of gas in returns. POH and LID 3-1/2" DP through Pipe Shed. POH LDDP - 210 jts. out. Keeping hole full pumping across top of hole with charge pump. Fluid losses = 18 bbls/hr. Finish POH LDDP. POH LID Halco 9-5/8" RBP. Pull wear ring. Clear and clean rig floor. RID DP handling tools. R/U rig floor to run completion equipment. R/U torque turn equipment for running new 3-1/2" 9.3#,13 CR-80, VAM TOP completion string. R/U stabbing board and compensator. Will re-tally completion tubing row by row to confirm pipe tally accuracy while RIH w/same. RUNCMP PJSM followed by Hands-On training session for Rig personnel to familiarize them with the operational requirements for running Yam Top thread Chrome Tubing. RUNCMP RIH wI new 3-1/2",9.2#, 13Cr-80, Vam Top Tubing. Use optimum Torque Turn setting of 2,900 Ib-ft and Jet Lube Seal Guard thread compound on all connections above the Packer Assembly. Baker-Lok was applied to the first 4 connections made up on the rig below the Packer Assembly. All other connections below packer bucked up and Baker-Lok'd at BOT prior to delivery to wellpad. 60 jts. in hole at 1800 hrs. RIH rate = -12 jts./hr. 145 jts. in hole. Keeping hole full pumping across top of hole with charge pump. Fluid losses = 10 bbls./hr. RIH w/Jt. #210. Keeping hole full pumping across top of hole with charge pump. Fluid losses = 10 bbls./hr. RIH w/Jt. #240. Stab headpin. Prepare to space out and land completion. Keeping hole full pumping across top of hole with charge pump. Fluid losses = 10 bbls./hr. RID Headpin. P/U and RIH wI Tubing joints #241, #242, and #243. See slight bobble about l' in on Jt #243, slowly lower and stack out 15' in on #243. POH to middle of #242 and slowly lower back into Tubing Stub with same results. POH to middle of #242, put 1/4 to 1/2 turn into the string while slowly lowering and stack out l' in on Jt #243. POH and take out the 1/4-1/2 turn, lower back in and stack out at 15' in on Jt #243. P/U weight = 65,000 Ibs; SIO weight = 65,000 Ibs. RUNCMP PJSM. Calculate spaceout; need two 3-1/2" Vam Top Tubing Pup Jts. P/U Hanger and M/U to XO and to short DP pup joint to prepare for Reverse Circulation of two, 290-Bbl truckloads of hot seawater throughout wellbore. Mix two drums of Corexit EC-1124A Corrosion Inhibitor, one per truck, and Rev Circ @ 3-Bbls I minute, taking returns to the Blowdown Tank. RUNCMP Blow down circulating line to Tiger Tank. Clear and clean Rig Floor. RUNCMP Break off DP pup joint from landing XOs to Tubing Hanger. C-21 C-21 WORKOVER 4.50 CLEAN Ii; I Code i NPT ! I : ___.___1_ -- P I Phase ! Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To : Hours Task 5.00 CLEAN P DECOMP 2.50 CLEAN P DECOMP 6.00 CLEAN P DECOMP 1.50 CLEAN P DECOMP 1.00 CLEAN P DECOMP 0.50 CLEAN P DECOMP 8.50 RUNCO RUNCMP 1.00 RUNCO 5.50 RUNCO 18:00 - 00:00 6.00 RUNCO RUNCMP 3/13/2006 00:00 - 04:00 4.00 RUNCO RUNCMP 04:00 - 06:00 2.00 RUNCO RUNCMP 06:00 - 09:30 3.50 RUNCO RUNCMP 09:30 - 15:30 15:30 - 16:00 16:00 - 17:00 6.00 RUNCO 0.50 RUNCO 1.00 RUNCO Start: 3/2/2006 Rig Release: Rig Number: Spud Date: 7/13/1982 End: Description oJ Operations ... ....... n.... ____.____.____ ..........-.----.--. Printed: 3/20/2006 12: 1 0: 13 PM Page 8 of 8 BP EXPLORATION Operations Summary Report M/U full Landing Joint and torque same. P/U and RIH to land Tubing Hanger. P/U weight = 68,000 Ibs; S/O weight = 68,000 Ibs. RILDS and test Tubing Hanger to 5,000 psi. Drop Ball and Rod. Pressure up tubing to 3500 psi to set packer. Charted same for 30 minutes. Bleed tubing down to 1500 psi. Pressured up inner annulus to 3500 psi to test packer. Charted same for 30 minutes. Good test. Packer set successfully. Bled off tubing to 0 psi and sheared DCR valve. RUNCMP PJSM. Set TWC. N/D BOPE. RUNCMP N/D BOPE. Disassembling BOPE stack into separate components in preparation to return it to BP stores. A new and different BOPE stack will be assembled and utilized on next well. N/U Adaptor Flange and Tree and Test to 5,000 psi. Good Test. P/U Lubricator and Pull TWC. R/U Hose for U- Tubing Diesel Freeze Protect Fluid. R/U Lil Red Hot Oilers and Freeze Protect Well with 160-Bbls Diesel. Rig down, lower derrick, move rig and components to GPB W-15. Rig released @ 2100 hours. Wait on Weather to lower Derrick. Continue to Rig Down and secure equipment in Rig modules. Wait on winds to decrease in order to Scope and lower Derrick. Scope down and lower Derrick and get modules ready for Rig move to W-15. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-21 C-21 WORKOVER Date i From - To ; Hours I Task ¡Code NPT ¡ Phase ¡ ! ! ; 3/13/2006 16:00 - 17:00 RUNCMP 17:00 - 18:00 1.00 RUNCMP 18:00 - 21 :30 3.50 RUNCMP 3/14/2006 21 :30 - 00:00 00:00 - 09:00 2.50 BOPSU 9.00 BOPSU 09:00 - 14:30 5.50 WHSUR P RUNCMP 14:30 - 19:00 4.50 WHSUR P RUNCMP 19:00 - 21 :00 2.00 RIGD P RUNCMP 21 :00 - 00:00 3.00 RIGD N WAIT POST 3/15/2006 00:00 - 05:30 5.50 RIGD N WAIT POST 05:30 - 08:00 2.50 RIGD P POST Start: 3/2/2006 Rig Release: Rig Number: Spud Date: 7/13/1982 End: Description of Operations _...___n ..... _n .....___.___..____._.. ._n_ --..--.-.. Printed: 3/20/2006 12: 1 0: 13 PM TREE = 6" CrN n~1 ~ CaT C-21 e WHLL~EAO - MCEVOY ~~-~"^'~~'--~""~ ACTUATOR = OTIS Completion KB, ELEV = 67.5' ,,__ ... _ ..... ~. ·~,··7·-,~ BF. ELEV = 34.6' I I 2221' -13-1/2" HESX-NIP, 10=2.813" I KOP= 6800' Max Angle = 27 @ 7500' Datum MD = 9021' Datum 1V0 = 8800'SS 9-5/8" OV PKR I 2598' - . ~ :: GAS LIFT MANDRELS ST MO 1V0 OEV TYPE VLV LATCH PORT DATE 13-3/8" CSG, 72#, L-80, BTRS, 10 = 12.347" I 2669' 1-4 ~ ~ 4 3092 MMG OCR RKP 0 03/13/06 .....! 3 5196 MMG OMY RK 0 03/13/06 2 6794 MMG OMY RK 0 03/13/06 1 7665 MMG OMY RK 0 03/13/06 Minimum ID = 2.75" @ 7823' I · I 7723' 1-13-1/2" HES X-NIPPLE, 10 = 2.813" I 3-1/2" XN NIPPLE :8J .,........." 7745' 1-19-5/8" X 4-1/2" BAKER S-3 PKR, 10 - 3875" C::" I · I 7771' 1-13-1/2" HES X-NIPPLE, ID = 2.813" I · I 7823' -13-1/2" HES XN-NIPPLE, ID = 2.75" 3-1/2" TBG, 9.2#, 13CR, .0087 bpf, 10 = 2.992" 7844' t- - 1-15-1/2" FLUTED "NO-GO" COLLAR 7846' Y ...- I 7861' 1-14-1/2" MULE SHOE, ID = 3.958" 5-1/2" TBG STUB, 17#, L-80, ID = 4.892" 7850' -- :8 ~ 7914' 1-19-5/8" OTIS PKR, ID = 4.00"1 '--' .2S, I I 7965' -14-1/2" OTIS X NIP, ID = 3.813" 1 I 7" BOT LNR HGR W/ TIEBACK SLV I 7967' l-iE I I I I 7992' 1-13-3/4" BKR DEPLOY MENT SL V, ID = 3.00" I I TOP OF 3-1/2" LNR, ID = 2.992" I 7998' I 8006' -14-1/2" OTIS XN NIP, ID = 3.725" (BEHIND PIPE) I 14-1/2" TBG, 12.6#, L-80, 8048' 1 -14-1/2" WLEG (BEHIND PIPE) I 8049' .0152 bpf, 10 = 3.958" I 8042' H ELMD TI LOGGED 05/04/93 I 19-5/8" CSG, 47#, L-80, .0732 bpf, 10 = 8.681" I 8484' f-.4 ~ -f CALCULA TED TOC I 8710' 13-1/2" LNR, 9.3#, L-80-JT1, 9145' .0087 bpf, ID = 2.992" ..,. 9146' HTrN GUIDE SHOE, 10 = 2.992" I PERFORA TION SUMMARY I REF LOG: BHCS BHCA 07/25/82 ANGLEATTOPPERF: 16 @ 9027' ~ Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9027 - 9030 S 05/09/98 3-3/8" 4 9046 - 9134 S 04/05/99 [ I 2-1/2" 4 9143 - 9153 C 01/05/01 2-1/2" 4 9153-9173 C 01/05/01 2-1/8" 6 9155 - 9175 C 08/25/99 ¡ 3-3/8" 6 9165 - 9192 C 08/31/96 [ I I PBTD I 9237' I I I 7" LNR, 29#, L-80, .0371 bpf, 10 6.184" I 9280' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BA Y UNrr 07/12/82 ORIGINAL COM PLETION 12/08/04 RWLITLP GL V C/O WELL: C-21 04/06/99 3-1/2" SCAB LNR 09/24/05 MOR/TLH PX TIP SET (01/19/05) PERMrr No: 1820810 07/30/01 CH/KAK CORRECTIONS 10/22/05 EZLlPJC WAr-fER SFTY NOTE DELETED API No: 50-029-20753-00 10/03/03 JCrv1ITLP GL V C/O 03/13/06 GMH RWO NABORS 3S SEC 19, T11 N, R14E, 884' SNL & 1523' WEL 09/29/03 KDClTLP WA IV ERED WELL 10/03/03 JCM/TLP GL V C/O BP Exploration (Alaska) STATE OF ALASKA ' ALASK/( ,)IL AND GAS CONSERVATION C~wIMISSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other Re-Peris 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, Sec 19, T11N, R14E, UM At top of productive intervhl 1316' SNL, 2120' WEL, Sec 19, T11N, R14E, UM At effective depth 1408' SNL, 2259' WEL, Sec 19, T11N, R14E, UM At total depth 1414' SNL, 2269' WEL, Sec 19, T11N, R14E, UM 6. Datum Elevation (DF or KB) KBE = 67.40 feet 5. Type p_[ ~well:. . I,X,t ueve~opment [] Exploratory [] Stratigraphic [] Service 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number C-21 9. Permit Number / Approval No. 82-81 10. APl Number 50- 029-20753 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 9282 feet true vertical BKB 9119 feet Effective depth: measured 9237 feet true vertical BKB 9076 feet Casing Length Size Structural Conductor 110' 20" x 30" Surface 2647' 13-3/8" Intermediate 8451' 9-5/8" Production Liner 1313' 7" Scab Liner 1155' 3-1/2" Plugs (measured) Junk (measured) Cemented 72 c.f. concrete 3883 c.f. Amticset II 1136 c.f. Class 'G', 130 c.f. AS I 368 c.f. Class 'G' 73 c.f. Class 'G' MD TVD BKB 143' 143' 2680' 2680' 8484' 8359' 7967'-9280' 7881'-9117' 7991'-9146' 7903'-8988' ., Perforation depth: measured Open Peris 9143' - 9192' Sqzd Peris 9027' - 9030', 9046' - 9134' true vertical Open Peris 8985' - 9032' Sqzd Peris 8873' - 8876', 8891' - 8976' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 tubing to 7894' with 4-1/2" tailpipe to 8049'. Packers and SSSV (type and measured depth) 9-5/8" Otis Packer Assembly at 7884'; Cement Packer from 8710' to 9146'. 5-1/2" Otis SSSVLN @ 2094'. 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure RECEIVED 05 2001 qaska Oil & Gas Cons. C0mmissior~ Anchorage 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 5. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ScottLaVoie '~'~ ~,~,~,~ Title TechnicalAssistant "'- """ - ' Prepared By Name/Number: Form 10-404 Rev. 06/15/88 ORiGiNAL Date De Wayne Schnorr 564-51'74 Submit In Duplicate C-21 ('~ Description of Work Completed NRWO OPERATIONS 01/05/2001 01/05/2001 PERF(REPERF): PERF 9153-9173 AND 9143-9153 FT MD PERF(REPERF): FREEZE PROTECT THE TUBING AFTER E- LINE JOB. SUMMARY 01/05/01 GUN #1 - 9153-9173 FT MD = 2.5" HSD @ 4 SPF. CHARGES = PJ2506. EXPLOSIVE LOAD = 10.7 GRAMS. PENETRATION = 25.2". ENTRANCE HOLE = .32". THESE SPECS REFER TO BEING SHOT IN 3.5" CASING. PERFORMANCE MAY BE FURTHER REDUCED SINCE THE LOWER PART OF THE GUN WAS PARTIALLY CENTRALIZED IN THE 7" CASING BY THE UPPER PART OF THE TOOLSTRING WHICH WAS IN 3.5" SCAB LINER. ***WELL LEFT FREEZE PROTECTED WAITING ON PBGL INSTALLATION*** 01/05/01 FREEZE PROTECT THE TUBING. Fluids Pumped BBLS. 5O 5O TOTAL Description DSL RE PERFS 01/05/2001 SUMMARY The interval 9153'- 9173' was perforated using 2-1/2" HSD Power Jets guns, 4 SPF, random orientation. The interval 9143'- 9153' was perforated using 2- 1/8" Enerjet gun loaded with Power Jets, 6 SPF. 9,143'- 9,153' MD 9,153'- 9,173' MD MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, ~k\\b~b\ DATE: Commissioner Tom Maunder, ~ P. I. Supervisor O~1o~-(:3 I~ THRU: March 23, 2001 FROM: Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests PBF1PBU CPad March 23, 200,1: I traveled to Prudhoe Bay Field to witness Safety Valve System tests on BPX's C Pad. Well house inspections were also conducted. Merv Liddelow was the BPX representative in charge of testing, and performed the tests in a professional manner. Twenty-one weilson C-Pad .were tested with five.failures witnessed. The SSV on well C-04A tripped below 50% of the separator psi, the SSV on well C-07A failed to hold D/P, the pilot on well C-19B was frozen, the pilot on well C-20B failed to trip and the SSV failed to hold DIP. Mr. Liddelow indicated, to me that all failures were repaired within 24 hours. I inspected 21 well houses and noted leaking'wing valves on wells C-03A, C-13A and..'C-19B. A hydraulic fluid leak on the SSV control line of well C-05 and a slight crude oil leak from the SSV on well C-25A were also noted. Mr. Liddelow indicated he would have these items corrected. The AOGCC test forms are attached for reference. SUMMA.R, ,Y: I witnessed the SVS tests on twenty-one oil producing wells on C Pad in the Prudhoe Bay Field. 21 wells tested 42 components, Ii failures witnessed, and 11.9% failure rate. 21 well houses inspected. Att,a, chments' SVS PBU C-Pad 3-23-01 JJ CC: SVS PBU C Pad 3-23-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/C Pad Separator psi: LPS ..... i74' ' Date: 3/23/01 ' HPs 662 Well Permit Separ Set L/P Test Test Test Date oa, WAG, aI~J, Number Number PSI PSI Trip Code C, ode Code Passed , ~AS or CYCLE C-O1 1720300 C-02 ' 1~30040 662 550 '525 P P ..... OIL C-03A 1981840 662 550 530 P P OIL C-04A " 1960920 '662 ' 550 ' 220 ' 3 P 0IL C-05 1730110i 174 125 115 P P OIL C-06A 1981'570 662 550 580 P P ' ' ' OIL C-07A 20005'20"' 662 '550 545 " P ' 4 .... OIL C_08A' '195028'0 ................. C-09 1790260 ~-10 1790350 ....... C-Il '1790460 662' 550 595 P P .... oil C-12A 1981160 ................. C-13A 1971430 662 "'550 590 ' P P ......... oIL c-15 1791090 ......... c-16 1800100 ~-17A' '1980230'' ~62 550 580 P b OIL C-18A 1991290 C-19B" 2000050! 662 550 250 '2 ' P ....... OIL ~-20B _..2001140 662 ,',,550 0 1 4 ...... OIL I llllll' 18208i0 174 125 120 P P ' ' ' OIL C-22 18208'80 "662 ' 550 560 P 'P ...... C-23A 1961190 C-24 '1821410 ' 662! '550 545 "P P ...... OIL C-2~A ' '1950110 662! " 550 510 'P P " C-26A 1981450 C-27A 1961390 C-28 1821950 ......... C-29^ 1961700 d-3'0' ' '187i360' 662 ' '550 525 ' P ' P ' 0iL C~3iA 1950060 662 550 ' 560 P 'P .... OIL C.33 ' 1930770 ' C234 1880150 .................. C-35A 1952000 174 125 120 P P OIL C-36A"' 2000020 174 125 .... li5 P 'P .... OIL RJF 1/16/01 Page 1 of 2 SVS PBU C Pad 3-23-01 JJ1 WeB Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Td.p ,, Code Code , Code , Passel GaS or C~O.~: C-37 " 1930550 662 550 550 P P OIL C-38 1860660 , , , C-39 1930940 C-41 1930990 C42 193'0500 '662 ' 5'50 590 'P P .... OIL Wells: 21 Components: 42 Failures: 5 Failure Rate: 11.90°/J~19o Day Remarks: Opg, rator reports all failures repaired and passed retest. [ [ , [; [ [ [ [ u, [ [ [ [ [ , .! ] [ 1[ RJF 1/16/01 Page 2 of 2 SVS PBU C Pad 3-23-01 JJ1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser,~~,'~~\ DATE: Commissioner ,om P. I. Supervisor April 23, 2001 FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit C Pad Monday. Ar~ril 23. 2001: I traveled to BPXs C Pad and witnessed a portion of the 30-day retest of the safety valve systen'=. As the attached AOGCC Safety Valve System Test Report indicates I witnessed the testing of 11 wells and 22 components with 1 failure. The Surface Safety Valve on weliC-20B failed to pressure test. This valve is~a repeat failure from the previous test An attempt was made atthis time to service the valve, but the subsequent retest,also-failed. This-Well' wasshutin until repairs could~becompleted. I.departed location prior to COmpletion of the testing on this Pad due to a required BOP test on Nabors Rig 9ES, I spoke with Merv Liddelow on. the morning of 4-24-01 and he indicated them were no further failures on remainder of the wells tested. Merv Liddelow performed the testing today; he demonstrated good test procedures and was a pleasure to work with. Summary: I witnessed a potion of 30-day SVS testing at BPXs C-Pad. PBU C Pad, 1.1 wells, 22 components, 1 failure 4.55% failure rate on the witnessed portion of the pad. A, ttac, h ~_rnent: SVS PBU C Pad 4-23-01 CS X Unclassified Confidential (Unclassified if doc. removed ) SVS PBU C Pad 4-23-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By:" ChUck'Scheve Field/Unit/Pad: Prudhoe / PBU / C Pad Separator psi: LPS 174 Date: 4/23/01 .. RJF 1/16/01 Page 1 of 2 SVS PBU C Pad 4-23-01 CS Well Permit Separ Set L/P Test Test Test Date oa, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE C-01 1720300! C-02 1730040~ C"-03X '1981840i 644 550 " 500 P ~ ........... OIL C-04A 1960920 C-05' " 1730110 174 125 100 'P ~ OIL C-06A 1981570 C-07A 2000520 "644'" 550'520 P P ..... 0IL C-08A I1950280 174 125! 120 P P OIL C-09 1790260 C-10 1790'350 ............. C'.11 . 1790460 ..... C-12A 19811601 C-13A 1971430'i ................... C-15 1791090 C- 16 1800100 C_'i 7A "'1980230 " i .............. · C-18A 1991290 C-19B 2000050 644 550 5251 'P 'P ..... OIL '~-20B 2001140 'i74. 125 110 P 4 .... OIL C-21 1820810 174! 125 115 P P ' OIL C-22 1820880 '644! 550 550 'P P 0IL C-23A 1961190 C-24 1821410 644 550 525 i~ P -oiL c-25/~ 1950110 '644 550! 475 e ' 'P ....... OIL C-26A 1981450 C.27A .... 1961360 ....... c-28 1821950 ........ C,29A 1961700 ..... c-30 1871360 C-31A 1950060! C-33 1930770 C-34 1880150 .... HPS 644 Well Permit Separ Set L/P Test Test Test Date oi~ WAG, GIN& Number Number PSI PSI Trip Code Code Code Passed GAS or CYCL~ C-35A 1952000 C-36A 2000020 C-37 1930550 C-38 1 $60660 C-39 1930940 644 550 500 i:' P OIL , C-41 1930990 C-42 1930500 ~ , , Wells: 11 Components: 22 Failures: 1 Failure Rate: 4.55% [-[ 90 Day Remarks: Surface Safety Valve on Well C-20B failed when pressure tested. Retest after valve serviced also failed, well was shut in pending repairs. This is a partial pad test. RJF 1/16/01 Page 2 of 2 SVS PBU C Pad 4-23-01 CS MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, Commissioner Tom Maunder, P. I. Supervisor DATE: April 23, 2001 FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit C Pad Monday, April 23.2001: I traveled to BPXs C Pad and witnessed a portion of the 30-day retest of the safety valve systems. As the attached AOGCC Safety Valve System Test Report indicates I witnessed the testing: of11 wells and 22 components with 1 failure. The Surface Safety Valve on well C-20B failed to pressure test. This valve is a repeat failure from the previous test. An ~attempt was made at this time to service the valve but the sUbsequent retest a!so failed. This well was shut in until repaim could.be completed. I departed location prior to completion of the testing on this Pad due to a required BOP test on Nabors Rig 9ES. I spoke with Merv Liddelow on the morning of 4-24-01 and he indicated there were no further failures on remainder of the wells tested. Merv Liddelow performed the testing today; he demonstrated good test procedures and was a pleasure to work with. Summary: I witnessed a potion of 30-day SVS testing at BPXs C-Pad. PBU C Pad, 11 wells, 22 components, 1 failure 4.55% failure rate on the witnessed portion of the pad. Attachment: SVS PBU C Pad 4-23-01 CS X.... Unclassified Confidential (Unclassified if doc. removed ) SVS PBU C Pad 4-23-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe / PBU / C Pad Separator psi: LPS 174 Date: 4/23/01 HPS 644 Well Permit Separ Set L/P Test Test Test Date o~ wng, GmJ, Number Number PSI PSI Trip Code Code Code Passed GASorCYCLE C-01 1720300 C-02 1730040 C-03A 1981840 644 550 500 P P OIL C-04A 1960920 C-05 1730110 174 125 100 P P OIL C-06A 1981570 C-07A 2000520 644 550! 520 P P OIL ~08A 1950280 174 125 120 P P OIL · C-09 1790260 C-10 17903501 C-Il 1790460 C-12A 1981160 C-13A 1'971430 C-15 1791090 C-16 1800100 C-17A 1980230 C-18A 1991290 C-19B '2000050 644 550 525 P P ' OIL C-20B 2001140 174 125 110 P "::~:~.i:~ OIL ~!~,i~,~,~,,,~,??, 1820810 174 125 115 P P OIL C-22 1820880 644 550 550 P P OIL C-23A 1961190 C-24 1821410 644 550' 525 P P 0IL C-25A 1950110 644: 550 475 p P OIL C-26A 1981450 C-27A 1961390 C-28 1821950 C-29A 1961700 C-30 1871360 C-31A 1950060 C-33 1930770 C-34 1880150 ' RJF 1/16/01 Page 1 of 2 SVS PBU C Pad 4-23-01 CS Well Permit Separ Set L/P Test Test Test Date o~, WAC, GmJ, Number Number PSI PSI ,Trip Code Code Code Pas,sed GAS,or CY ,C~E C-35A 19520O0 C-36A 2000020 C-37 1930550 " ' C-38 1860660 C-39 1930940 644 550 500 P " P ' OIL , , i C-41 1930990 C-42 1930500 Wells: 11 Components: 22 Failures: 1 Failure Rate: 4.55% 1"'190 Day Remarks: Surface Safety Valve on Well C-20B failed,when, p,r, ess,~e tested. ,Re,test aft,e,,r.,,valv...e' .v serviced a~o ~,,,w,',euWas shu. t in ~nd,',m, ~, r,e,p..airs. Tlfis~ is a pm'tiM, pad test. , ................. RJF 1/16/01 Page 2 of 2 SVS PBU C Pad 4-23-01 CS STATE OF ALASKA A ASXA . REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: F-I Operation Shutdown I--] Stimulate r-] Plugging [~ Perforate I-~ Pull Tubing I--I Alter Casing [] Repair Well [] Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UM At total depth 1414' SNL, 2269' WEL, SEC. 19, T11N, R14E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 67.40' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number C-21 9. Permit Number / Approval No. 82-81 10. APl Number 50-029-20753 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 9282 feet true vertical 9119 feet Effective depth: measured 9237 feet true vertical 9076 feet Casing Length Size Structural Conductor 110' 20" x 30" Surface 2647' 13-3/8" Intermediate 8451' 9-5/8" Production Liner 1313' 7" Scab Liner 1155' 3-1/2" Plugs (measured) Junk (measured) Cemented 8 cu yds concrete 3883 cuff Arcticset II 1136 cu ft Class 'G', 130 cuff AS I 368 cuft Class 'G' 73 cu ft Class 'G' MD TVD 143' 143' 2680' 2680' 8484' 8359' 7967'-9280' 7881'-9117' 7991'-9146' 7903'-8988' Perforation depth: measured Open: 9155' - 9175', 9165' - 9192' Sqzd: 9027' - 9030', 9046' - 9134', 9144' - 9165' true vertical Open Subsea: 8929' - 8949', 8949' - 8965' Sqzd Subsea: 8806' - 8809', 8824' - 8909', 8919' - 8949' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 to 7884' with 4-1/2" tailpipe to 8049' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary 9-5/8" Otis packer assembly at 7884'; 5-1/2" SSSV at 2094' Intervals treated (measured) Treatment description including volumes used and final pressure FEB 09 14. Pri'or to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby c~,~3tify tJ~'t the $oregoj~g is true and c~ect to the best of my knowledge Signe "' ~ ¢ , _ _ ~.- _ _ ..., Title Technical Assistant IV Prepared By Name/Number: Date ///7/~'¢ In Duplicate Form 10-404 Rev. 06/15/88 C-21 (~ DESCRIPTION OF WORK COMPLETED REPERF 08/25/99 SUMMARY The following interval were reperforated using 2 1/8" guns, 6 SPF, random orientation and 0° phasing. 9155' - 9175' MD KA(~' STATE OF ALASKA (~i ALAS ~L AND GAS CONSERVATION CO : ,~ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [--I Operation Shutdown I--I Stimulate i--1 Plugging [--1 Perforate I--] Pull Tubing I--IAIter Casing [~ Repair Well I--1 Other 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11 N, R14E, UM At total depth 1414' SNL, 2269' WEL, SEC. 19, T11N, R14E, UM Type of well: ~] Development [~ Exploratory ~] Stratigraphic 1--1 Service 6. Datum Elevation (DF or KB) KBE = 67.40' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number C-21 9. Permit Number / Approval No. 82-81 399-051 10. APl Number 50-029-20753 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 9282 feet Plugs (measured) true vertical 9119 feet Effective depth: measured 9237 feet Junk (measured) true vertical 9076 feet Casing Length Size Cemented Structural Conductor 110' 20" x 30" 8 cu yds concrete Surface 2647' 13-3/8" 3883 cu ft Arcticset II Intermediate 8451' 9-5/8" 1136 cu ft Class 'G', 130 cu ft AS I Production Liner 1313' 7" 368 cu ft Class 'G' Scab Liner 1155' 3-1/2" 73 cu ft Class 'G' MD TVD 143' 143' 2680' 2680' 8484' 8359' 7967' - 9280' 7881' - 9117' 7991' - 9146' 7903' - 8988' Perforation depth: measured Open: 9155' - 9175', 9165' - 9192' Sqzd: 9027' - 9030', 9046' - 9134', 9144' - 9165' true vertical Open Subsea: 8929' - 8949', 8949' - 8965' Sqzd Subsea: 8806' - 8809', 8824' - 8909', 8919' - 8949' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 to 7884' with 4-1/2" tailpipe to 8049' Packers and SSSV (type and measured depth) 9-5/8" Otis packer assembly at 7884'; 5-1/2" SSSV at 2094' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl 5. Attachments [~] Copies of Logs and Surveys run [~] Daily Report of Well Operations '1'1, 6. [~ Oil Status of well classifications as: Casing Pressure Tubing Pressure [--] Gas [-] Suspended Service 7. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ...... ~,,~ ~ Terrie Hubble . . Title Technical Assistant III Prepared By Name/Number: Date ~/~i~ ~ Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Well: C-21 Accept: 04/03/99 Field: Prudhoe Bay Spud: N/A APl: 50-029-20753 Release: 04/06/99 Permit: 82-81 CTD Unit: Nordic #1 Date Day Depth O4/O4/99 1 Moved rig. Accepted @ 0900 hrs 4/3/99. NU & Tested BOPE. Inspected & tested DS hardlines. Loaded pipe shed. Started loading well w/2% KCI. 04/05/99 2 Loaded well w/2% KCI. PU 3-1/2" liner (OAL: 1155.28'). Ran 1-1/4" CSH inside 3-1/2" liner. MU Baker CTLRT. RIH to 9146'. Dropped 5/8" ball. Released f/liner. Mixed cmt. Cmt'd liner w/13.0 bbls 15.8 ppg slurry. Sqz'd 1.5 bbls cmt dn backside to 1000 psi. POH w/CTLRT & 1- 1/4" CSH. Welded on coil conn. PU 3.75" cleanout assy. RIH to 7900'. WOC for comp strength to increase. O4/O6/99 3 Test liner top to 1500 psi--OK. Mill cement and float equipment to 9148'. Pressure test liner squeeze to 1500 psi, held OK. Clean out Carbo-Lite to 9226'. Short trip to liner top and back to bottom, no fill. Drop 5/8" steel ball and open circulation sub. Circulate and clean hole, POOH while circulating. Freeze protect tubing from 2000'. POH. LD cleanout BHA. RR 0001 hrs 4-6- 99. Conducted 2 Insta-seal tests. Test was very promising. Circ coil w/water. RD pumping eqmt. RU nitrogen truck. Blew dn coil. . STATE OF ALASKA ~ ALASI~, _ ,L AND GAS CONSERVATION C,J,,..,IISSION APPLICATION FOR SUNDRY APPROVAL Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: [~ Development i--I Exploratory i~1Stratigraphic E]Service 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UM At total depth 1414' SNL, 2269' WEL, SEC. 19, T11N, R14E, UM 6. Datum Elevation (DF or KB) KBE = 67.40' AMSL 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number C-21 9. Permit Number 82-81 10. APl Number 50-029-20753 11. Field and Pool Prudhoe Bay Field / Prudhoe B_ay_ Poo, F F 12. Present well condition summary Total depth: measured 9282 feet true vertical 9119 feet Effective depth: measured 9237 feet true vertical 9076 feet Casing Length Size Plugs (measured) Junk (measured) Structural Conductor 110' 20" x 30" 8 cu yds Surface 2647' 13-3/8" 3883 cu ft Intermediate 8451' 9-5/8" 1266 cu ft Production Liner 1313' 7" 368 cu ft Cemented MD TVD 143' 143' 2680' 2680' 8484' 8359' 7967'-9280' 7881'-9117' Perforation depth: measured Open: 9155' - 9175', 9165' - 9192' Sqzd: 9027' - 9030', 9046' - 9134', 9144' - 9165' true vertical Open Subsea: 8929' - 8949', 8949' - 8965' Sqzd Subsea: 8806' - 8809', 8824' - 8909', 8919' - 8949' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 to 7884' with 4-1/2" tailpipe to 8049' ORIGINAL Packers and SSSV (type and measured depth) 9-5/8" Otis packer assembly at 7884'; 5-1/2" SSSV at 2094' 13. Attachments [~ Description summary of proposal [--I Detailed operations program [--I BOP sketch 14. Estimated date for commencing operation April 5, 1999 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Ted Stagg, 564-4694 Date approved 15. Status of well classifications as: [~ Oil r--] Gas i--I Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,~~~ · Ted Stagg Title CT Drilling Engineer Commission Use Only lAppr°val N0~.,;,~,-- _/0.~/ Conditions of App_..r~val: Notify Commission so representative may witness _^0°¥5 Plug integrity__ BOP Test~ Location clearance__ ~ og~O'~t'~e~,/~ Mechanical Integrity Test Subsequent form required 10- NO ~' ,,,¢ ~e~,~ ~'1 -- ORIGIN-~'L SIGNED__ Appro~ Commission p, cb,,,+ kl ~hri~t~.n.~onBY Commissioner Date °~'o~," ¢ ~ Form 10-403 Rev. 06/15/88 Submit In Triplicate BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: March 19, 1999 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Reservoir Engineer Re: Well C-21 Scab Liner Well C-21 is scheduled for a scab liner job to be installed by the coil drilling unit, DS/Nordic 1. Production logs run on C-21 have identified leaking squeezed perforations in the liner between 9027' and 9134' BKB. These perforations have been squeezed twice but the remedial work has failed to stop gas entry. The 3 W' scab liner is to be hung from the XN nipple in the tubing tailpipe and cemented in place with approx. 12.6 bbls cement. The scab liner will then be drilled out and the well returned to production. The. following summarizes the procedure and is submitted as an attachment tc~ Form 10-403. A schematic diagram of the proposed completion is attached. 1. RU slick line and drift for the 3.5" liner. 2. Dummy off GLM's. Liquid pack and PT inner annulus to 2000 psi. 3. Kill well. 4. Cover existing perfs with 20/40 carbolite to 9,145'. Tag to confirm. 5. Run and cement 3.5" ST-L scab liner. PT to 2000 psi. 6. Drill out float equipment. 7. Wash out carbolite covering perforations. 8. Put well on production. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center TREE: 6-" ClW WELLHEAD: MCEVOY ACTUATOR: OTIS C-21 Proposed Scab Liner I 9-5/8 D.V. PACKER I 2598' 13-3/8", 72#/ft, I 2669' L-80, BTRS I IKOP:6500" I MAX ANGLE: 27°@ 7500' IDB-I/2", 17#/ft, L-80, BTC MOD TUBING IPC : 4.75" APAClTY: .0232 BBL/FT LINER 9-5/8", 47#/ft, 1 8484' L-80, BTRS Planned top of cement 8672' Cemented 3 1/2" ST-L scab liner KB. ELEV = 67.50' BF. ELEV = 34.60' SSSV LANDING NIPPLE ( OTIS )( 4.562" ID) I 2094' I GAS LIFT MANDRELS OTIS LBD WI RA LATCH) Na MD~'BKB3 'l'VDss 3 3097 3097 2 4486 4486 I 5265 5265 10 5801 5801 9 5958 5958 8 6317 6317 7 6472 6472 6 6801 6799 5 6957 6952 4 7285 7263 3 7441 7405 2 7597 7545 I 7754 7686 SLIDING SLEEVE OTIS XA ( 4.562" MIN. ID) I"""~ I 3 SEAL ASSY. I 7894' 9-5/8" PACKER (OTIS)(4.0"ID) I7914' 4.5", 12.7#/ft, L-80 TAILPIPE 4.5 .... X" NIPPLE (3.813",D) I 7985' "' "'XN"NIPPLE L 8006' ( 3.725" ID) 4.5" WLEG I 8049' (OTIS) ( ?.?? "ID ) (ELMD) 8041' 9027 Leaking squeezed perfs Planned shoe depth 9140' PERFORATION SUMMARY REF: LOG: BHCS BHCA 7/25/82 3-3/8"I 4 I 9027-9030' SQZ"D 3-3/8"I 4 I 9046-9134' SQZ'D ~'~"1" I sez'~ 3-3/8"I 6 I OPEN 3-3/8"16I OPEN 9144-9165' 9155'-9175' 9165'-9192' - 9134 - 9144 - 9192 PBTD l 9237' 7", 29 #/ft, L-80,1J4S DATE 7-12-82 12/30/90 8/31/96 9/5/96 REV. BY HART EBK SRB I9280' COMMENTS COMPLETION ORIGINAL MAC DIAGRAM Post Sqz Perf ADD PERFS PRUDHOE BAY UNIT WELL: C-21 (19-11-14) APl NO: 50-029-20753 SEC 19; T11N ; RG14E BP Exploration (Alaska) STATE OF ALASKA ALAS,~,~'L AND GAS CONSERVATION COMMISSIO,,bI,~~, REPORT ([. SUNDRY WELL opE'[.',.,TIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging.m Perforate Pull tubing Alter casing 2. Name of Operator BP Exl~loration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchoracle, Alaska 99519-6612 4. Location of well at surface 884'SNL, 1523'WEL, SEC. 19, T11N. R14E. UPM At top of productive interval 1316'SNL, 2120' WEL. SEC. 19, T11N, R14E, UPM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414' SNL. 2269' WEL. SEC. 19, T11N, R14E, UPM Repair well Other × 5. Type of Well: Development ..~ Exploratory Stratigraphic Service ~ 6. Datum elevation (DF or KB) KBE = 67.50 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number C-21 (32-19-11-14) PBU 9. Permit number/approval number 82-81 / 10. APl number 50-029-20753 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9282 feet Plugs (measured) BKB 9119 feet 9237 feet Junk (measured) BKB 9076 feet Casing Length Size Cemented Measured depth True vertical depth Structural .. BKB Co nd ucto r 110 20x30 8 c. v. 143 143 Surface 2647 13 3/8 3883 c.f. 2680 2680 Intermediate 8451 9 5/8 1266 c.f. 8484 8359 Production .. Liner 1313 7 368 c.f. 7967-9280 7881-9117 Perforation depth: measured Squeezed off: 9027'-9030'; 9046'-9134'; 9144'-9180'; 9180'-9185' true vertical~ubsea 806'-8809'; 8824'-8909';8919'-8953'; 8939'-8965' t~ E C ~ l V ~ D Tubing (size, grade, and measured depths 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' Packers and SSSV (type and measured dept~ 5/8" Otis packer assy. at 7884'; 5 1/2" SSSV at 20 ' 13. Stimulation or cement squeeze summarySee attachment Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINA 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 602 14454 6 0 1046 14688 11 0 Tubing Pressure 2330 364 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: OilX Gas Suspended Service 17. I hereby certify that the f(x~going is true ,:3pd correct to the best of my knowledge, ~igned / Title TechnicalAssistantlV Form 10-404 I~ev-0~) 1~5/8'8 ~ - -- Date/////~ ~ SUBMIT IN DiJPL~CATE.~ 05~08/98 C-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS A GSO Marasel Squeeze was performed using the following fluids: SUMMARY RIH with 3.0" combo nozzle. Dry tag sand at 9,034 and correct depth to 9,042'. PUH to 8600' and cooled liner with 315 bbls of water. BH 10 bbls of 15%HCL/Xylene into perfs. Had a nice break but lost all benefit before Maraseal arrived. Over displace acid with 40 bbls of FSW and 15 bbls of FW. Pump 50 bbls of Maraseal. Formation gradually pressured up while BH Maraseal. When injectivity got to 1500 psig at .6 bbl, opened chokes and held 1000 psig on well. Cut cement stage to 8 bbls. Circulated cement down to 9035 and closed chokes when perfs were covered. Pressure ramped quickly 3000 psig then broke back for about 0.5 bbls. Held 3000 psig on squeeze for 45 mins. Jetted excess Maraseal and cement OOH with slick water and 25 bbls of dual polymer. Attempt to jet through interface but was unable. Laid 10 bbls of TEA across perfs. Began to POOH and lost a suction valve. Pump was down for 11 mins for repairs. Ran back in hole to 9010' and jetted liner and tubing while POOH. FP well to 2000'. Final PT was JFT at 550 psig. We gauged 26 bbls of returns from the time chokes were opened until cement got to nozzle - estimate 24 bbls of Maraseal went behind pipe and approximately 1 bbl of cement. Estimated TOC 9042' Fluids Pumped BBLS. Description 50 Maraseal 21 Fresh Water 10 TEA 8 Cement 353 KCL Water 25 Dual Polymer 384 Slick KCL water 10 15% HCL/Xylene 861 TOTAL A(L,-, STATE OF ALASKA ii~ ,SKA OIL AND GAS CONSERVATION COMM ~ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging .. Pull tubing Alter casing Repair well Perforate X Other × 2. Name of Operator BP E~loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884'SNL, 1523'WEL, SEC. 19, T11N, R14E, UPM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UPM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414' SNL, 2269' WEL, SEC. 19, T11N, R14E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 67.50 AM.. SL 7. Unit or Property name Prudhoe Bay Unit 8. Well number C-21 (32-19-11-14) PBU 9. Permit number/approval number 82-81 /90-363 10. APl number 50- 029-20753 11. Field/Pool Prudhoe Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 9282 feet BKB 9119 feet Plugs (measured) measured 9237 feet Junk (measured) true vertical BKB 9076 feet Length Size Cemented .. Measured depth 110 20x30 8 c. y. 2647 13 3/8 3883 c.f. 8451 9 5/8 1266 c.f. .. 1313 ' 7 368 c.f. 143 2680 8484 7967-9280 measured 9155'- 9175; 9165'-9192' (open r~p, e~d~). Squeezed off: 9027'-9030', 9046-9134', 9144'-9155' true vertical subsea 8929'-8949', 8939'-8965' True vertical depth BKB 143 2680 8359 7881-9117 ORIGINAL Tubing (size, grade, and measured depth) 5 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' Packers and SSSV (type and measured depth) 9 5/8" Otis packer assy. at 7884'; 5 1/2" SSSV~£~ ~ ! ~1 F F~ 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure SEP 1997 .Gas Cons, Commiss 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 602 14454 6 0 1046 14688 11 0 Tubing Pressure 2330 364 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended . 17. I here~.~ that.,~ for?l?7 is tr~7~ect to the best of my knowledge. Si~lned ' //2'/~r-~ /~ Title TechnicalAssistant III Form 10-404 Re~ 06/15/88 Service Date SUBMIT IN DUPLICATE WELL C-21(11-05-10-14) _ NRWO/Reperf 8/23/96 A CTU GSO Cement Squeeze was performed using the following fluids: SUMMARY Clean out fill to PBTD at 9232 ft. May have picked up IBP rubber lost in 1/90, but didn't pull it up past 9212 ft. Squeezed with 13 bbls cement. Got good squeeze but it broke down during live reverse out near the bottom of the lower perfs. Jetted interval and reversed out. Tried pressure test and got 0.25 bpm injectivity at 1300 psi WHP. Since it broke down In the intended reperf interval we decided not to resqueeze. Left the well with a nitrogen cap to maintain pressure on the well while the cement set. Recovered 11 bbls cement to solids van. Cement details: 15.8 ppg class G 0.57% FL-33 0.1% CD-32 0.34% R-11 1 gps FP-6L Fluid loss 44 cc/30 min (lab), 43 cc/30 min (field) Thickening time 8 hours plus 1 hour surface time. BBLS. Description 4 9 3 Produced water 1 3 Flopro 5 8 0 Seawater 2 0 Freshwater 1 3 Cement FLUIDS PUMPED 8/31/96 The following interval were reperforated using guns, 6 SPF, non- orientation and 60° phasing. 9165'-9192'MD 3 3/8" 9/05/96 The following interval were reperforated using3 3/8" guns, 6 SPF, non- orientation and 60° phasing. 9155'-9175'MD LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 18 April 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~-~1 C-21 (32-19-11-14) ~q- [qq U-02 ~3--~5k A-38 DESCRIPTION 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 PLS FINAL BL+RF ECC NO. Run # 1 4352.03 Run # 1 4502.03 Run # 1 5962.03 Run # 1 6503.04 Run # 1 6624.02 Run # I Run # I 6650.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by:. Date: tAAY 0 5 ]996 ~chorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference, BP C-21 (32-19-11-14) PRUDHOE BAY NORTH SLOPE, AK Date: RE: 24 January 1996 Transmittal of Data ECC #: 4352.02 Sent by: HAND CARRY Data: LDWG Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE+LIS Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 RECEtVED Received by, Date, FIB 0 g 1996 Alaska Oil & Gt~s Cons, ~;ommission Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 16 January 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 CN FINAL BL+RF 1 CN FINAL BL+RF 1 PDK FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC No. Run # 1 1390.11 Run # 1 1393.05 Run # 1 4352.02 Run # 1 4590.03 Run # 1 5853.04 Run ~ 1 6308.02 Run # 1 6444.05 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Received ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 24 May 1994 Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION R-27 C-21 (32-19-11-14) W-07 (44-27-11-12) /1 CN/GR FINAL BL 1 CN/GR FINAL RF SEPIA / DTEMP/GR FINAL BL 1 DTEMP/GR RF SEPIA /~ PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA ECC No. Run # 1 5670.02 Run # 1 Run # 1 4-352.01 Run # 1 Run # 1 6052.01 Run # 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: Please sign and return to: ~petrotechnieal Data Center Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alaska 99508 Received by ~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP/PBU ~S DATE: 05/11/93 T# 84558 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. PRODUCTZO~ PRODUCTZO~ M-26 ~0-O I PFC R-28 ~ ~ PFC x-0 6 gO -t~ ~r/ 05/04/93 #1 05/04/93 #1 05/07/93 #1 05/04/93 #1 05/06/93 #1 8900.00- 9175.00 ATLAS 5 " 7690.00- 9183.00 ATLAS 5 " 10912.00-11200.00 ATLAS 5 " 9200.00- 9680.00 ATLAS 5 " 11950.00-13130.00 ATLAS 5 " Information Control Well Records RECEIVED ~Y 2 ~-199~ ,~at~il& Gas t;u~s. Commission Anchorage STATE OF ALASKA .KA OIL AND GAS CONSERVATION COMMI .. REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown .... Stimulate Plugging Pull tubing Alter casing Repair well 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 5. Type of Well: Development ~ Exploratory Stratigraphic ..... Service 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UPM At top of productive interval 1316'SNL, 2120' WEL, SEC. 19, T11N, R14E, UPM At effective depth 1408'SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414' SNL, 2269' WEL, SEC. 19, T11N, R14E, UPM 12. Present well condition summary Total depth: measured true vertical Alaska 0it & Gas Cons. 9282feet Plugs (measured) BKB 9119feet Perforate x Other~ 6. Datum elevation (Dlerd~J[B) KBE= 67.~~SL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number '" C-21 (32-19-11-14) PBU 'g' Permit number/approvaZnUmber 82-81/90-363 10. APl number 50- 029-2O753 tl. Field/Pool Prudhoe Oil Pool Effective depth: measured 9237feet true vertical BKB 9076feet Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20x30 8 c.y. Surface 2647 13 3/8 3883 c.f. Intermediate 8451 9 5/8 1266 c.f. Production -- Liner 1313 7 368 c.f, Perforation depth: measured 9144'- 9180' Measured dePth True vertical depth BKB 143 143 268O 2680 8484 8359 7967-9280 7881-9117 Squeezed off: 9046'-9134' true vertical subsea 8919' - 8953' Tubing (size, grade, and measured depth) 5 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' Packers and SSSV (type and measured depth) 9 5/8" Otis packer assy. at 7884'; 5 1/2" SSSV at 2094' 13'.'" Stirnulaii;3n Or cement squeeze s~mm~ry '5/19/90 The following intervals were added using 3 3/8" guns, random orientation and 90° phasing. Intervalstreated (measured) 9180'- 9185'5 spf 9O27' 9030' 3 sl~f Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average .Production or Inje.¢tion Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1810 13171 18 0 285O 2358 29 0 Tubing Pressure 694 233 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I herebY"certify th_at the foregoing i~ tru~ and coriect to the best of my knowledge. Signed ~5~'A~/m~, ~. ~//~ Title Senior Technicai Assistant l Form 10-404~ Rev 06/15/88 Service Date SUBMIT IN D'I~'~L'~CA~E BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 661-5~11 TO: DISTRIBUTION ' Date :03~28/91 T#:82256 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-17 Inj 03/17/91 #1 9900-10800 Camco 5" B-10 Gas Entry 03/10/91 #1 10200-10527 Camco 5" C-12 Prod-F 03/11/91 #1 11500-11448 Camco 5" C-21 Temp 03/18/91 #1 .8900-9163 Camco 5" D-24 Temp 03/18/91 # 1 10700-10930 Camco 5" F-18 Leak Det. 02/19/91 #1 0-11438 Camco 5" G-31 PITS 03/08/91 # 1 8900-9200 Camco 5" H-16 Gas Entry 03/09/91 # 1 1900-10037 Camco 5" N-09 Tie In CCL 03/19/91 #1 8100-9350 Camco 5" Q-02 Prod-F 03/08191 #1 8850-9350 Camco 5" Q-03 Prod-F 03/07/91 # 1 8850-9350 Camco 5" Q-06 Pmd-F 03/07/91 #1 11050-11350 Camco 5" Z-18 CCL 03/15/91 #1 13081-13929 Camco 5" Z-32 Leak Der. 03/16/91 # 1 400-10250 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED APR 1 Alaska 0il & (~as C~,~s. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc.. 900 East Benson Boulevarcl P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 05/30/90 EXXON T# 81193 PHILLIPS STATE OF ALASKA ARVHIVES SYSTEM Taoe & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. C-12 CH/CNT-D SCH#73881 C~-21 CH/CNT-D SCH#73868 05/14~90 1600bpI 05115/90 1600bpi #4 11096-11979 4 passes AP!#50-029-20387 #1 8489-9217 4 passes AP!#50-029-20753 C-22 CH/CNT-D 05/16/90 #1 9292-10110.5 SCH#73869 1600bpi 4 passes AP1#50-029-20758 05/17~90 1600bpI 05/17/90 1600bp~ J-13 CH/CNT-D SCH#73871 J-26 ::-CH/CNT-D SCH#73874 #1 4 passes #1 4 passes. 10779-11726.5 TP#07069 AP1#50-029-20497 9812:5--10651.5 -TP#07070 7 AP!#50-029-21734 Z-14 CH/CNT-D 05/16/90 SCH#73872 1600bp~ #1 4 passes 9592-10251.5 TP#07071¥~., AP1#50-029-21844 ,Z//~ ,_~ Z-20 CH/CNT-D 05/16/90 SCH#73873 1600bpi #1 4 passes 10586.5-11568 TP#07072 AP1#50-029-21859 4~- ~'_5'~ / ***ARCHIVES ONLY: Information Control Well Records LR 2-1 J. Dietz/S. McCurry Alaska Oil & Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 05/23/90 T#:81206 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-21 CNL 05/15/90 #1 8500-9189 SCH 5" C-22 CNL 05/16/90 #1 9300-10088 SCH 5" J-13 CNL 05/17/90 #1 10800-11699 SCH 5" J-26 CNL 05/,17/90 # 1 9820-10627 SCH 5" Z-14 CNL 05/16/90 #1 9600-10235 SCH 5" Z-20 CNL 05/16/90 # 1 10650-11526 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. .~9.00 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :05/23/90 T#:81167 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-21 PFC 05/18/90 #1 8950-9174 Atlas 5" R-04 CN/GR 05/19/90 #1 91100-9824 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR_ APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing Repair well ,, Change approved program . 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UPM At top of productive interval 1316'SNL, 2120' WEL, SEC. 19, T11N, R14E, UPM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414'SNL, 2269'WEL, SEC. 19, T11N, R14E, UPM 12. Present well condition summary Total depth: measured 9282 feet true vertical BKB 9119 feet Opera, on Shutdown Plugging 'Pull tubing .... Variance 5. Type of Well: Development X Exploratory ~ S~'atigraphic Service Re-enter suspended well~ Time extension Stimulate Perforate x Other Plugs (measured) 6. Datum elevation (DF or KB) KBE = 67.50 AMSL feet 7. Unit or Property name Prudhoe Bay Unit · . 8. Well number C-21 (32-19-11-14) PBU i ii 9. Permit number 82-81 10. APl number 50- 029-20753 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 9192 feet true vertical BKB 9032 feet Junk (measured) fill at 9192' (03/90) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20x30 8 c.y. 143 Surface 2647 13 3/8 3883 c.f. 2680 Intermediate 8451 9 5/8 1266 c.f. 8484 Production -- Liner 1313 7 368 c.f. Perforation depth: measured 9144'- 9180' true vertical subsea 8919'- 8953' Tubing (size, grade, and measured depth) 5 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' True vertical depth BKB 143 2680 8359 7967-9280 7881-9117 Packers and SSSV (type and measured depth) 9 5/8" Otis packer assy. at 7884'; 5 1/2" SSSV at 2094' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation May 1990 16. If proposal was verbally approved Oil X Gas . . Name of ap. pr~over Date approved Service 17. I hereby~ that the foreg~s tr/:f_~ and cor.rect to the best of mY kn°wledge. Si~ned · ,7,/ Title Su ervisorGraw' Draina e ~ - ~ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10---~z~- ORIGINAL SIGNED BY LONNIE C. sMITH i , Approved by order of the Commission Form 10-403 Rev 06/15/88 15. Status of well classification as: . Suspended . Approved Copy Returned 2__z-9o Date I oprova' "o. pa ' [ Commissioner DateS-I~ I SUBMIT IN TRIPLICATE WELL C-2! ¢32-19-11.14~ PBU ADD'L. PERFORATION PROPOSAl. We propose to perforate the following additional intervals during May 1990: 9027' - 9030' MD BKB 9180' - 9192' MD BKB A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jm 5110190 BOWEN PACKOFF FLOW TUBES & PACKOFF HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE FLOWLINE VALVE RISER GREASE /" -MANIFOLD GREASE PUMP BOP .-.---GREASE RESERVOIR BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 03/16/90 Transmittal: 80941 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you questions, please contact BP Well Records at (907) 564-4445. C-21 TEMP 03~03~90 #1 8950-9191 Camco C-25 TEMP 02/28/90 #1 10000-10223 Camco J-14 PROD-F 03/05/90 #1 10250-10527 Camco Q,01 PROD-F 03/06/90 #1 '9250-9650 Camco R-18 TEMP 03/04/90 #1 ~700-1005~ Camco W-~6 PROD-F 03/01/90 #1 13050-13321 Camco W-23 LEAK DET. 02/27/90 #1 ~-10100 Camco W-~3 LEAK DET. 03/03/90 #1 9700-10100 Camco have any 5" 5" 5" 5" 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR RECEIVED BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 21, 1990 Alaska Oil & Gas Conservation Conmtission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well C-21 (32-19-11-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing remedial/capacity sustainment work on the well. R. B. Frazier Supervisor Gravity Drainage RBF:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File RECEIVED FEB 2 ~ lggo ~Chora~ ~ STATE OF ALASKA ( (~' .~SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIOI 1. Operations performed: Operation shutdown Stimulate ..... Plugging Pull tubing Alter casing 2. Name of Operator BP Explorati~ (Alaska)/nc. 3. Address P. O. Box 196812, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UPM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UPM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414' SNL, 2259'WEL, SEC. 19, T11N, R14E, UPM 12. Present well condition summary Total depth: measured 9282feet true vertical BKB 9119feet Repair well 5. Type of Well: Exploratmy Plugs (measured) Perforate Other X 6. Datum elevation (DF or KB) K~E. 67.50 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number C,-21 (32-19-11-14) PBU 9. Permit number/approval number 82-81 / 8-936 10. APl number 50- O29- 2O 753 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 9237feet true vertical BKB 9076feet Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20x30 8 c.y. Surface 2647 13 3/8 3883 c.f. Intermediate 8451 9 5/8 1266 c.f. Production -- Liner 1313 7 368 c.f. Perforation depth: measured 9144'- 9180' Measured depth True vertical depth BKB 143 143 2680 2680 8484 8359 7967-9280 7881-9117 Squeezed off: 9046'-9134' true vertical subsea 8919'- 8953' Tubing (size, grade, and measured depth) 5 1/2" L-80 to 7884'with 4 1/2"tailpipe to 8049' Packers and SSSV (type and measured depth) 9 5/8" Otis packer assy. at 7884'; 5 1/2" SSSV at 2094' 13. Stimulation or cement squeeze summary see attachment Intewals treated (measured) Treatment description including volumes used and final pressure FEB 2 3 1990 Alaska 011 1 Gas Cons, ,~. mlssb 14. Reoresentative Daily Averaae Production or Iniection Data -- - OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1810 13171 18 0 694 Subsequent to operation 2850 2358 29 0 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run ... Dally Report of Well Operations X Oil X Gas ... Suspended ..... 17. I here~ ~y th~ t~reg.~)g is true and correct to the best of my knowledge. Signed ~.4~ ~_.). 7~~ Title Supervisor Gravity Orainage Form 10-404 Rev 06/15/88 ~" 233 Service SUBMIT IN DUPLICATE WELL C-21 (32-19-11-14~ PBU CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as follows: 3/9189 Rigged up CTU and support equipment and pressure tested BOP's to 4000 psi. Performed perforation acid and pumped cement to squeeze existing perforations. Squeeze broke down. 3/1 1/89 Rcsqucczcd. well. 3/13/89 Performed injcctivity test, okay. 3/31/89 Rigged up Schlumberger and rcpcrforatcd as follows using 3 3/8" Ultrajcr carrier guns at 4 spf: 9144' - 9180' MD BKB 4/6/89 Performed nitrogen lift, well would not flow. 4/14/89 Performed HCI perforation wash and nitrogen lift. Returned well to production and tested. 5/5/89 Ran production logs; upper squeezed pcrfs had broken down. 10/30/89 Set inflatable bridge plug at 9138' and dumped sand on top to 9120' MD. 1 1/9/89 Resqueezed well. 11/10/89 Performed inflow test, okay. 11/15/89 - 1/13/89 Retrieved bridge plug after several attempts and lost tools. Returned well to production and tested. jam 2/14/90 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Renson Boulevard P.O. Box 196612 Ancl3orage. Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES BP CASED HOLE FINAL LOGS Date: 05/15/89 T$: 80063 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-ii Inj-F 05/03/89 %1 9800-10053 Camco 5" C-21 Prod-F 05/05//89 91 8900-9214 Camco 5" D-18 Temp 05/04/89 %1 '2900-11200 Camco 5~ H-12 GR 04/27/89 %1 9100-11310 Camco J-23 Completion 05/08/89 %1 10396-11607 Sch Q-04 Tubing Record 05/05/89 %1 8882-9524 Sch R-19 Prod-F 05/02/89 %1 9500-9950 ~amco W-17 Completion 05/07/89 %1 11370-11850 Sch 5" W-18 PITS 05/05/89 %1 9050-9507 Camco W-22 PITS 05/04/89 $1 9300-9650 Sch 5" W-22 Prod-F 05/04/89 $1 9300-9674 Sch 5" X-24 Inj-F 05/03/89 %1 9100-9345 Camco 5" Y-18 Inj-F 05/02/89 ~1 10850-11115 Camco 5' Received: Date: Anchorage Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION TO: HOUSTON ARCO CHEVRON BP Exploration (Alaska) In~ 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 9951~6612 (907) 561-5111 EXXON TEXAuO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES Date: 04-07-89 T~: 79941 RESERVOIR REFERENCE: ARCHIVES : Bp'CASED HOLE FINAL LOGS The following material is being submit-fed herewith. Please acknowledge receipt by signlng a copy of this letfer and returning It to this office: C-21 Completion 03-31-89 #I 7950-9201 Sch 5" D-26 Completion 03-02-89 #1 9690-9930 Sch 5" K-lO Completion 04-01-89 #1 9440-10070 Sch 5" U-3i Completion 04-02-89 #1 8910-9492 Scb 5" U-lOi Copmletion 04-02-89 #1 9450-10104 Sch 5" Y-3i Completion 04-04-89 ~1 0-9280 Sch 5" Y-09 Completion 04-05-89 #1 10120-10450 Sch 5" Y-11i Completion 04-05-89 #1 9546-9850 Sch 5" Z-01 CNL (2 1/2")03-31-89 #1 10100-10784 ' Sch 5" Y-05i Completion 04-04-89 #1 9680-9900 ,Sch 5" Rece I ved Date Anchorage S h i r l e y R. M c~. I NFOR~T I ON CONSOL .. We I I Records LR2-i BP EXPLORATION REFERENCE: HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OFALASKA GEOSCIENCES RESERVOIR ARCHIVES ' · BP'CASED HOLE FINAL LOGS BP EXlOlOration (AlaSka) Inc. 900 East Benson Boulevard Ra Box 196612 Ancftorage. Alaska 995196612 (907) 561-5111 Dale: 03-30-89 Ti: 79915 The following material Is being submll-i'ed herewith. Please acknowledge receipt by signing a copy of this lePter and returning It to this office: ~A-29 $C-21 ~D-08 ~D-26 ~E-11 · E-17 m J-05 eM-03 -M-14 m N-04 · R-08 mu-gI eW-04 ~ W-1 0 mY-01 PROD-R 02-21 -89 #1 Leak Det 03-09/1 0-89#1 Completion 03-07-89 #1 PROD-R 03-11 -89 #1 PROD-R 03-1 2-89 #1 PITS 03-08-89 #1 PITS 03-10-89 #1 INJ 03-14-89 #1 INJ 03-1 4-89 '#1 PITS 03-09-89 #1 GAS LIFT 03-1 0-89 #1 INJ 03-15-89 #1 CCL 03-11-89 #1 CCL 03-11 -89 #1 GAS LIFT PROD 3-13-89 #1 10600-11067 · Camco 5" 7800-921 5 Camco 5" 8800-10472 Camco 5" 10500-10920 Camco 5" 10400-10572 Camco 5" 10800-11093 Camco 5" 10000-10250 Camco 5" 10600-11100 Camco 5" 10100-10770 Camco 5" 10100-10400 ,Camco 5" 2500-10500 Camco 2"/5" 10700-11320 Camco 5" 11310-12210 .Camco 5" ' 1 3640-1 4604 Camco 5" 12250-12794 Camco 5" Rece i ved Date '4nch~J;' c°n]~nis~''~[~ ~ k Shirley R. McCurry I NFORMAT I ON CONTROL We I I Records LR2-1 Standard Alaska J~roduction Company ( 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION December 6, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well C-21 (32-19-11-14) PBU Gentlemen: Enclosed, in triplicate, is FOrm 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze on a leaking squeezed interval. Yours very truly, JAB:JAM Enclosures (9) cc: L. Burke, MB12-1 C-21 Well File A. Bragg vv ager Production Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operal~on Shutdown ~ Re-enter suspended well Alter casing , Repair well~ Plugging Time extension ~ Stimulate ~ Change approved program ,,, Pull tubing ~ Variance~ Perforate~ Other X , 2~ Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T1 IN, R14E, UPM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UPM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414'SNL, 2269'WEL, SEC. 19, T11N, R14E, UPM 121 Present well condition summary Total depth: measured 9282 feet true vertical BKB 9119 feet 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 67.50 AMSL feet ,, 7. Unit or Property name Prudhoe Bay Unit 8. Well number C-21 (32-19-11-14) PBU ,, 9. Permit number 82-81 10. APl number 50- 029-20753 11 Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 9237 feet true vertiCal BKB 9076 feet Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20x30 8 c.y. Surface 2647 13 3/8 3883 c.f. Intermediate 8451 9 5/8 1266 c.f. Measured depth 143 2680 8484 True vertical depth BKB 143 268O 8359 Production Liner 1313 7 368 c.f. 7967-9280 7881.9117 Perforation depth: measured 9144'. 9180' true vertical subsea 8919' - 8953' Tubing (size, grade, and measured depth) 5 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' Packers and SSSV (type and measured depth) 13. Attachments 9 5/8" Otis packer assy. at 7884'; 5 1/2" SSS V at 2094' Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: December 1988 ' 16.' if proposai Was Verbally approved " Oil X Gas, Suspended Name of approver Date approved Service 17. I hereby certify 'that the foregoing is true and correct to the best of my knowledge, Signed (~,,//~,~~~f/ FOR COMMISSIoNTitle Manager Production EngineeringusE ONLY Condigns of approval: Notify CommisSion so representative may witness Plug integrity ~ BOP Test Location clearance ~ Mechanical Integrity Test~ Su-'-'--bsequent form required 10- Approved by order of the Commission Form 10-403 Rev 06/15/88 Date/Z" I Approval No. ORIGINAl. SIGNED BY Approved Copy Returned /~- ~__~ ~ Commissioner SUBMIT IN TRIPLICATE STATE SUNDRY APPLICATION WELL C.21 It is planned to cement squeeze well C-21 and reperforate as before. Well C-21 was first squeezed in September 1987 to reduce gas production from an upper perforated interval. The squeezed perforations are now leaking gas sufficiently to warrant a re,squeeze with coiled tubing. The post-workover perforations will be 9,144' - 9,180'MD BKB. The leaking squeeze perforations extend across 9,046' - 9,134'MD BKB. 1. Rig up coiled tubing unit and pressure BOP's to 4000 psi. 2. Surge the perforations with a shear out disk set in tailpipe nipple. 3. Return well to production. 4. Set low fluid loss, non-damaging, sized salt pill across target production interval. Top of salt to be dressed at 9136'MD. 5. Liquid pack wellbore with produced water. 6. Acid wash target squeeze perfs (9046-9134'MD) with acid. 7. Pump cement with surfactant/mutual solvent pre-flush. 8. Perform cement squeeze on leaking perforations (9046-9134'MD). 9. Contaminate cement in the wellbore. 10. Reverse out contaminated cement. 11. Leave well freeze protected and slightly overbalanced with nitrogen filling top ~4000'MD of tubing. 12. Remove salt and place well back on production by releasing trapped nitrogen to low pressure system. Coiled Tubin~ Blow-Out-Preventers Coiled Tubing . Pack-Of'~ Blind Rams [~=:{ I '1 Cutter Rams 2' Chlcksan (Kill Line) Pump-In Sub (Clrcu[a te/R e turns) W ell Head Swab Valve Standard Alasl~a · P~odu¢llon Company 900 Eos! Benson 8oulevord PO. Bo. 196619 Ancha,oge. Alaska 99~%19-6612 fgO?! .564-51 I ! ARCO EXXON PHILLIPS STANDARD ALASKA PRODUCTION Date: 11/17/88 79553 TI: SYSTEMS (Transmittal & Tape) ARCHIVES SA_PC MAGNETIC LIS TAPES & LISTINGS Ihe following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: * C-21 C-29 ·E-06 ·E-16 e F-28 · G-30 · H-16 ***~*~*J-26 CH/CNL MS 4 Pass 10/16/88 #I Atlas~3564 1600bpi API~50-029-2 CH/CNL/MS 3 Pass 10/20/88 #I Atlas#3569 1600bpi API#50-029-2 CH/CNL MS 3 Pass 11/13/88 Atlas#360.0 1600bpi API#50-029-2 CH/CNL MS 3 Pass 10/25/88 #I Atlas#3573 1600bpi API#50-029-2 CH/CNL MS 3 Pass 10/26/88 #I Atlas#3576 1600bpi API#50-029-2 CH/CNL MS 3 Pass 10/27/88 #I Atlas#3580 1600bpi AP1#50-029-2 CH/CNL MS 3 Pass 10/28/88 Atlas#3582 1600bpi API#50-029-2 CH/CNL MS 3 Pass 10/28/88 #I Atlas#3583 1600bpi API#50-029-2 CH/CNL MS 3 Pass 10/29/88 #I Atlas#3584 1600bpi API#50-029-2 CH/CNL MS 4 Pass 10/15/88 #I Atlas#3561 1600bpi AP1#50-029-2 10667-11611 0439 8409-9201 0753 10893-11968 1472 8783-9495 0101 8675-9363 0481 8826-9506 0424 8540-9324 1649 8986-9754 1613 9325-10500 0592 9776-10669 1734 Tape Pos. #06152 Tape Pos.#06156 Tape Pos. #06157 · Tape Pos. #06158 Tape Pos. #06159 Tape Pos. #06160 Tape Pos. #06161 Tape Pos. #06162 Tape Pos. #06163 Tape Pos. #06153 * EY~XON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. Received Date ~ ..... Alaska .................. . ..... , s ...... ,,,,,, <~, c .... or C-I 7&J-26from Trans#79538 ~e1! ~eco~d~ ~2-~ Standard Ala$l,a P~oduction Company 900 l~ost Ben,on t~oule,,ord P O. Bo. 196612 ~907~ 564 31 I I HOUSTON ARCO CHEVRON E~XON TEXACO TO: bIOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS I ND£ XED STANDARD Date: 10-27-88 Ti: 79474 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this off, ice: C-21 E-06 CNL/GR #1 10-10-88 8450-9190 Atlas 5" CNL/GR #1 10-25-88 8800-9478 Atlas 5" Received Date ~ ~Uaslm 0il & Gas Cons. Commission ~nchomge A un;t of She orlg;nol S,ondo,d C~I Co,,,por,), Founded Cie-fiend. 0~;o..n 1870 Shirley R. McCurry I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Company ( 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION April 12, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton 32-19-11-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforatlon of the well. Yours very truly, JAB: JAM ~ nager Production Engineering Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 C-21 Well File R'ECEIYEI) APR: 1 ~ ]gFJ8 Alaska Oil:& Gas :Cons. Coallalsslon Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. KA(r'~., STATE OF ALASKA ~' ALAS iL AND GAS CONSERVATION C v~MISSION REPORT OF SUNDRY WELL OPERATIONS Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter casing I-! Other [] Gas Shut-off Cement Squeeze 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 884' SNL, 1523' WEL, SEC. 19, T11N, R14E, UPM At top of productive interval 1316' SNL, 2120' WEL, SEC. 19, T11N, R14E, UPM At effective depth 1408' SNL, 2259' WEL, SEC. 19, T11N, R14E, UPM At total depth 1414' SNI~ 2269' WEL, SEC. 19, T11N, R14E, UPM 5. Datum elevation (DF or KB) KBE = 67.50 AMSL 6. Unit or Property name Prudhoe Bay Unit 7. Well number c-21 (32.19.11-14) PBU 8. Approval number 7-472 9. APl number 5 0 - 029.20753 10. Pool Prudhoe Oil Pool feet 1. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 9282 feet true vertical BKB 9119 feet measured 9237 fee t true vertical BKB 9076 feet Length Size .. 110 20x30 2647 13 3/8 8451 9 5/8 Tubing (size, grade and measured depth) Plugs (measured) Junk (measured) Cemented Measured depth True Vertical depth BKB 143 143 2680 268O 8484 8359 8 c.y. 3883 c.f. 1266 c.f. .. 1313 7 368 c.f. 7967-9280 7881-9117 measured 9144'- 9180' Squeezed off: 9046'-9134' true vertical subsea 8919'- 8953' 5 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' RECEIVED APR ! ~ ]988 Packers and SSSV (type and measured depth) Alaska 0il & Gas Cons. Commisslol 9 5/8" Otis packer assy. at 7884';5 1/2" SSSV at 2094' Anchorage 2. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 1.3. Reoresentative Da~'v Average Production or In!eG1;ion Oa~a Prior to well operation Subsequent to operation OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1880 14105 0 0 2225 1660 1659 10 0 201 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 5. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 1 Submit in Duplicate ,Well C-21 (32-19-11-14) PBU CTU CEMENT SQUEEZE OPERATIONS The following coiled tubing cement squeeze of existing perforations was performed as detailed below. Following CTU operations, the existing perforations were left squeezed and lower perforations were added. 1. Added squeeze perforations 9175' - 9180' MD BKB. 2. Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi. 3. Performed a mud acid stimulation of all perforations; flowed well. 4. Cleaned out wellbore to PBTD. 5. Performed cement squeeze on existing perforations and cement channel. Contaminated cement in the wellbore, then reversed out after 48 hours. Tested squeeze. 6. Perforated the following additional interval using Schlumberger 2 7/8" guns at 4 spf. 9144' - 9180' MD BKB 7. Returned well to production and tested. 8. Performed a selective mud acid stimulation of the interval 9144' - 9180' by isolating the interval from the upper squeezed intervals with an inflatable packer at 9138'. The above work was completed December 3, 1987. Alaska Oil & Gas Cons. Commission Anchorage 0834Z/jm 03/11/88 Slondo,d Alosl~o P~ocluctGon Componv-- 900 EOSIr ~'n%on P.O. 8o,, TO: DALLAS ARCO CHEVRON EXXON TEXACO ,MOBIL PHILLIPS STATE OF ALA~) GEoSCIENCES INDEXED S'FANDARD ALASKA PRODUCTION Date: 03/26/88 TI: 78685 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknovledge receipt by signing a copy of this letter and returning It to ?his office: A-13 B-9 C-4 C-14 C-27 C-34 · D-9 D-13 D-17 D-22 E-25 F-9 F-24 K-10 K-12 M-13 R-12 U-04 X-10 Y-24 Collar '; 11/14/87 #1 8400-9770 Atlas 5" " :: 02/26/88 #1 8500-9824 Atlas 5" ;::' 12/13/87 #1 10250-10681 Atlas 5" " ?~' 01/07/88 #1 10000-11859 'Atlas 5" " .. 11/15/87 #1 11000-11244 Atlas 5" DTL 0.3/11/88 #1 8800-9210 GO 5" CBT 03/17/88 '#I 8300-9615 Sch 5" Collar "01/09/88 #2 10150-10450 Atlas 5" " ~ 01/.08/88 #2 11200-11446 Atlas 5" " 1i/25/87 #1 8800-10392 Atlas 5" " 01/10/88 #2 9000-9443 Atlas 5" Collar/GR 03/06/88 #1 8500-10050 GO 5" Collar 11/04/87 #1 9750-10100 Atlas 5" Perf. Record 03/15/88 #1 11800-12289 Sch 5" CCL/Perf. 03/09/88 #1 9050-10050 GO 5" Collar 12/25/87 #1 8200-9353 Arias 5" Fullbore Spinner 03/15/88 #3 9300-9640 Sch 5" Production Logs 03/16/88 #2 10550-10950 Sch 5" PFC 02/29/88 #1 10765-11586 Atlas 5" Prod log 03/20/88 #1 10600-10900 Sch 5" Collar 11/22-23/87 #1 12820-13441 Atlas 5" Rece i ved , , Victoria Aldridge I NFORHAT I ON CONTROL Date 0il & Gas Cons. Commission Well Records LR2-1 Anch0~age' ' A un~! ct the ot,9;r, ot $1ondo.d Oil Founded ~ Cie-cio.cl. C:Y~o. ,. 1870 Standard AIo~i,o 900 Eo~, PO A~¢ ho, ocje. AIo~o TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS GEOSCIENCES INDEXED STANDARD ALASKA PRODUCTION Date: 03/17/88 TI: 78668 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by slgnlng a copy of this letter and returning it to this office: ' ~-28 H-7 N-8 N-15 N-18 N-19' W-40 W-40 Y-22 B-13 Miscible Gas Injection Profile 03/14/88 #1 10400-10826 CH/CNL 03/12/88 #1 10450-11341 Sch 5" FM/Temp 03/10/88 #1 8900-9229 Camco 5" CH/CNL 03/13/88 #1 ..10900-11930 Sch 5" Production Profile 03/11/88 #1 10550-10890 Camco 5" Injection Profile 03/11/88 #1 9600-9840 Camco 5" PITS 03/09/88 #1 9600-10200 Camco 5" PIT 03/I2/88 #1 9700-10035 Camco 5" PIT 03/13/88 #1 9700-10115 Camco 5" CBT 03/13/88 ~1 9302-10564 Sch 5" TCP Gun Positioning Log 03/14/88 #1 9973-10351 Sch 5" Temp/Gas Lift Survey 03/09/88 #1 3440-10585 Camco 5" Sch 5" Rece i red Date A un;t Ot the O,.9,nol Stondo,d OI Compony Founded ,n Cle-elond. ~,o. ,~ 1870 Victoria Aldridge INFORMAT I ON CONTRC)L Wel I Records LR2-1 Standard Alaska 900 East 8en~o,~ B<t PO ~, 19601? A~(ho, age. Alaska INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 12/30/87 TO: MOBIL TI: 78364 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED EIOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: ~J C-3 '" C-5 ~ C-27 "o J-2 ~ q-02 Spinner 12/07/87 #1 9850-10200 Camco 5" GR/CCL 12/08/87 #1 10900-11839 Camco 5" GR/CCL 12/01/87 #1 7800-9100 Camco 5" Production Profile 12/06/87 #1 10000-11230 Camco 5" Flowmeter 12/09/87 #1 9950-10260 Camco 5" Producttion Profile 12/03/87 #1 8850-9330 Camco 5" Recei ved Date Victoria Aldridge Alaska Oil & Gas Cons. Commi~[o~ '~ I NFORHAT I ON CONTROL Anh ,,~..c. oral~B Wel ! Records LR2-1 A un;! of the o,~g;nol Stondo,d Od Company Founded ,. Cle,,elond. C~*o. ,. 1870 TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES 'INDEXED STANDARD AL ASK A PRODUCTION Dete: 12/10/87 T~: 78352 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: ~ X-5 Injection Profile 11/29/87 #1 10400-10885 Camco 5" Caliper 11/28/87 #1 8200-9230 Camco 5" PIT/HPFM 11/29/87 #1 10000-10480 Camco 5" Race i ved Founded ,n Cle,,elond. Oh,o. in 1870 Victoria Aldridge INFORHAT ION CONTROL Wel I Records LR2-1 Standard Aloska ' P~ocluction Compan~~' 900 Eow B~,,~on ;907 564 5 I I I INDEXED DALLAS ARCO STANDARD CHEVRON /\L ASKA PR(")IM J(. I-I( )N EXXON Date: 10/01/87 TEXACO TO: TI: 78208 HOBIL ?HILLIPS STATE OF ALASKA · REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter end returning it to this office: '"~ B-27 ~ B-27 ~ B-3B ~ C-21 '"-- E-1 ~'-J-27 '~ J-28 J-28 ~ S-13 'JY-2 ~ Y-3 09/16/87 Camco Flowing Gradient 09/28/87 " " " 09/09/87 GO Flowing Pressure 09/16/87 Camco Static 09/22/87 Camco " 09/25/87 " " 09/17/87 " " 09/25/87 " " 09/12/87 " Flowing Pressure 09/22/87 " Static 09/15/87 GO Pressure Fall OFF INFORMAT ION CONTROL Oil & Gas Cons. Commiss[o~i ~ Alaska W~,l I Records ER2-1 · Anc, orage Co'"t)*a-x Standard Alaska P, oduction Compa( ( 900 Eo~.~ PO Bo. 196612 Anchotoge. 1907~ .564 511 I INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 09/18/87 TO: MOBIL T#: 78180 PHILLIPS & STATE OF ALASKA GEOSCIENCES STANDARD AI_A.%I'"/. !'Pr~I'~I I~ i i~ REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: A-3 B-7 B-13 C-21 K-9 Injection Profile 09/08/87 #1 11550-11925 S('hlum . 5" Production 09/10/87 #1 11550-11862 Schlum 5" Injection Profile 09/11/87 #1 10390-10914. Schlum 5" Completion Record,', 09/12/87 #1 9112-9214 Schlum 5" CBT 09/12/87 #1 9054-9922 Schlum 5" Rece i ved Victoria Aldridge INFORHAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Compan( 900 East 13en~on I~ou~, , P.O, Bo. 196612 Anchorage. AIo~,ko 99519-6612 1907'1 564-511 I INDEXED DALLAS ARCO CHEVRON STANDARD AL ASF~, PRQDI.JC TION EXXON , TEXACO Date: 08/18/87 TO: MOBIL - ' TI: 78128 PHILLIPS · STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: ~X.A_25 ~'~C-23 ~E-17 "'~ U-13 Perf. Record 08/01/87 #1 11952-12630 Sch 5" Production Log 08/07/87 #1 10800-11168 Sch 5" Production Log 08/08/87 #1 10350-10634 Sch 5" PFC 08/04/87 #1 8460-9214 Atlas 5" Collar 08/05/87 #1 .0-10272 Atlas 5"' Collar. 07/23/87 #1 10700-11201 Atlas 5" Flowmeter .07/26/87 #1 9900-10250 Camco 5" Collar 07/24/87 #1 10250-10562 Atlas 5" Collar 07/17/87 #1 10100-10550 Atlas 5" Gas Cons, (;0mmisst0~ .Anch0mge Rece i ved Date A un,I of she or,g,nol 51ondo~'d Fou-ded ,n Clevelc~,,d O~,r,) ,n 187(i Victoria Aldridge I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Compa~ 900 East Benson Bou,,~ard P.O. Box 196612 Anchorage, Alaska 99519-6612 (9071 561-5111 July 28, 1987 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well C-21 (32-19-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. Yours very truly, JAB:JAM¢ Enclosures (9) cc: J. L. Haas (MB12-1) C-21 Well File A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. A. Bragg ~/~ rvisor Production Operations RECEIVED ^Jas~a 0il & 6~s 0ohs. Anchorage APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 67.50 feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 884' SNL, 1523' WEL, Sec. 19, TllN, R14E, UPM At top of productive interval (top Ivishak/Sadlerochit) 1316' SNL, 2120' WEL, Sec. 19, TllN, R14E, UPM At effective depth 1408' SNL, 2259' WEL, Sec. 19, TllN, R14E, UPM At total depth 1414' SNL, 2269' WEL, Sec. 19, TllN, R14E, UPM 7. Well number C-21 (32-19-11-14) PBU 8. Permit number 82 -81 9. APl number 50--029-20753 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9282 feet 9119 feet BKB 9237 feet 9076 feet BKB Plugs (measured) Junk (measured) Casing Length Structural -- Conductor 75 ' Surface 2645 ' Intermediate 8449 ' Production -- Liner 1313 ' Perforation depth: measured 9046' - 9134' true vertical(SS) 8824' - 8909' Size 20"x30" 13 3/8" 9 5/8" 7" Cemented 8 cu. yds. 3883 c.f. 1266 c.f. 368 c.f. Tubing(size, grade and measured depth) 5 1/2" L-80 to 7884' with 4 1/2" tailpipe to 8049' Packers and SSSV(type and measured depth) 9 5/8" Otis packer assy. at 7884'; 5 1/2" SSSV at 2094' Measured depth 110' 2680' 8484' 7967'-9280' True Vertical depth BKB 110' 2680' 8359' 7881'-9117' RECEIVED 0il & Gas Cons. Commission 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation August 1987 14. If proposal was verbally approved Name of approver Date approved 15. I .hereby certify that the foregoing is true and correct to the best of my knowledge s igne~ ~ ~~ Title Supervisor Production O~)erations Date ?. __/ /J. A. Bragg (/(,/ Commission Use Only Conditions of approval Notify commission so representative may witness ~ Approval No. ~ Plug integrity ~ BOP Test ~ Location clearanceI ~ -- by order of L~H~IE ~ Approved by Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate WELL C-21 CTU CEMENT SQUEEZE PROPOSAL The following coiled tubing cement squeeze of existing perforations is proposed. Following CTU operations, perforations lower in the LOC will be added (9144'-9180' MD BKB) and the upper perforation intervals will be left squeezed (9046'- 9134' MD BKB). 1. Add squeeze perforations 9175' - 9180' MD BKB. 2. Rig up coiled tubing unit and pressure BOP's to 4000 psi. 3. Clean out wellbore to PBTD or to top of solid fill. 4. Perform cement squeeze on existing perforations. 5. Contaminate cement in the wellbore. WOC. 6. Reverse out contaminated cement after 48 hours. 7. Test squeeze. 8 Add perforations over the following interval at 4 spf: 9144' - 9180' MD BKB 9. Put well back on production and test, 10. If the well has problems in sustaining flow then perform a mud acid stimulation of the perforated interval. 11. Put well back on production and test. RECEIVED 2 9 Alaska OiJ & (~,s Cons. Com~issio.~ ^nchom~ Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams ' Chicksan (Kill Line) r I Slips Pipe Rams Pump-In Sub (Circulate/R e turns) Well Head Swab Valve RECE Alaska Oil &. Gas SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 October 20, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Wells C'-21'and D-16 PBU Enclosed, in duplicate, are Forms 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our subsequent reports of performing wells. GJP/J~Pjw Enclosures scale inhibitor treatments on these s~ly, ~GDis tJ;ic~t ' ;eg~rol e~~ Engineer cc: J. D. Hartz Geology Well File ~17 4 ~.~ C ho rag~ ~"~r~ts ~on STATE OF ALASKA (~ ALAStaA OIL AND GAS CONSERVATION C IdMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator Sohio Alaska Petroleum Company 3'Add~uch ~-612, Anchorage, Alaska 99502 4. Location of Well At Surface: 884' SNL, 1523' WEL, Sec. 19, TllN, R14E, UPM 7. Permit No. 82-81 8. APl Number 50_029-20753 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number C-21 (32-19-11-14) PBU 11. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 67.50' AMSL I ADL 28305 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Stimulate [] Abandon [] Stimulation :~ Repair Well [] Change Plans [] Repairs Made [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Altering Casing [] Abandonment [] Other [] 13. Describe Proposed or COmpleted Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.10.5-170). A 377 Bbl. Scale inhibitor squeeze treatment was performed over the following interval October 14, 1983, The well was shut-in for 24 hours after the treatment. The SSSV was removed prior to stimulation and reset after the Job at 2094'. RECEIVED Alaska 0il e.~ Gas Cas. C;omrnissior~ A~,ch0rage 9046'-9134' BKB (Ref. BHCA/GR, 7-25-82) 14. I ce t lng is true and correct to the best of my knowledge. Sign Title District :Petroleum ~.nqineer The ~,ge below fer ~ommissio ~ Conditions of Appr~al, if any: Approved by_ By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate Form 10-403 Rev. 7-1-80 and "Subsequent Reports"in Duplicate SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: SFO/UNIT/STATE: GETTY (-Marathon) MOBIL Date: 10/20/83 PHILLIPS STATE OF-AK ., BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmit tal Only) CC#: 74777 REFERENCE: · //~__HIO CASED HOLE FINAL LOGS // The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- F-6 Spinner 10/6/83 #1 CRUDE-10200 Otis 5" C-20'" Spinner 9/16/83 #1 12150-12480 Camco 5" C-21'/ Spinner 9/17/83 #1 8950-9170 Camco 5" C-23-'" Spinner 9/19/83 #1 9900-10160 Camco 5" D-20--~ Spinner 9/15/83 #1 10000-10300 Camco 5" X-3-~' Spinner 10/2/83 #- 11700-11915 Camco 5" 4/82) RECEIVEO DA]'E 19 .... Victoria Aldridge TP1-5 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99 502 EXXON To~ SFO/UNIT/STATE: (-Marathon) GETTY MOBIL PHILLIPS STATE BPAE (Transmittal Only) _ CENTRAL FILES (CC#'s - Transmittal Only) Date: 10/20/83 Trans.#: - CC#: 74778 REFERENCE: .. SO 0~' FINAL DATA - PRESSURE SURVEY DATA //e submitted herewith. Please acknowledge receipt by signing a following is being · copy of this letter and returning it to this office:- fA-21 Static Gradient 10/7/83 Camco /B-23 PBU & BHPD 7/16/83 Camco /C-19 PBU & BHPD 9/15/83 GO /C-20 Flowing Gradient 9/16/83 Camco .~C-21 FLowing Gradient 9/18/83 Camco ..C-22 PBU & BHPD 9/18/83 GO ,-C-23 PBU & BHPD 9/19/83 Camco ,,C-28 PBU & BHPD 9/30/83 GO zD-17 PBU '~ 9/01/83 Camco ,.D-17 BHPD 9/07/83 Camco ~-D-18 PBU & BHPD 9/08/83 GO ..D-20 PBU & BHPD 9/14/83 Camco ~ D-21 PBU & BHPD 8/23/83 Dresser /D-23 PBU 8/31/83 GO BHPD 8/01/83 GO ,~N-7 PBU 10/08/83 Camco /82) RECEIVED DATE 19 Victoria Aldridge TP1-5 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 September 22, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well C-21 (32-19-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the aDove-named well. This contains our proposal to perform a scale inhibitor treatment on this well. GJP/J~H/pjw Enclosures cc: J. D. Hartz Geology Well File #17 ~rs very truly, istrict Petroleum Engineer STATE OF ALASKA ALASKA(' LAND GAS CONSERVATIONr' tMISSION SUNDRY KOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Sohio Alaska Petroleum Company 3, Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of Well At Surface: 884' SNL, 1523' WEL, Sec. 19, TllN, R14E,. UPM 6. I~e~ De~g~(~n and Serial No. 5. Elevation in feet (indicate KB DF, etc.) LBE = 67.50' ASML' 7. Permit No. 82-81 8. APl Number 50-- 029-20753 9. Unit .or Lease Name Prudhoe Bay Unit 10. Well Number C-21 (32-19-11-14) PBU 11. FieldandPool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] - Perforations Stimulate I~ Abandon ' [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple compl.etions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ~i.::377 .Bbl. Scale inhibitor squeeze treatment will be performed over the following interval during October/November , 1983. The well will be shut-in for 24 hours after the treatment. The SSSV will be removed prior to stimulation and reset after the job at 2094'. 9046'-9134' BKB (Ref. BHCA/GR, 7-25-82) ~ 9/2_G)~3 Anshora~ 14. I h t $ true and correct to the best of my knowledge. Signed,~/'/ .~.,A.~"'--.~ {J.-~d,~ Title DiStrict Petroleum Engineer The sp~el~w fo~ ~mission use 0 ~ Conditions of Approval, if any: Approved Copy By' Order of Approved by ~ J'[~]J[ ~° ~J~]~ COMMISSIONER the Commission deturnec~ Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Dupli~ate SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY ~o: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE ., BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE Ig071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 9/22/83 Trans.#: - CC#: 74726 REFERENCE: FINAL DATA - PRESSURE SURVEY DATA i'he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- B-25 ~"~ Static Gradient 9/7/83 Otis C-18 ~' " 8/18/83 Otis C-19" " 8/20/83 Camco C-20" " 8/21/83 Camco C-21~''~ " 8/23/83 Otis C-22-'~' " 8/25/83 Camco C-23'~' " 8/31/83 Camco C-24 ....'~ " 9/3/83 GO C-28f' " 9/5/83 Otis D-3 ..... BH Pressure Report & BHPD 8/9/83 GO D-17 Static 8/13/83 Camco D-18~ " 8/19/83 Otis D-20--~ " 8/17/83 Camco Transient Pressure Survey & BHPD Sperry Sun H-8 ~ Pressure BU 8/11 & 12/83 Sperry Sun M-2/' Static Gradient ' 9/7/83 Camco N-9 Initial Well Transient Pressure & Spinner 9/5/83 GO Pressure BU 9/4/83 GO Static Gradient 9/8/83 Camco N-9' R-1/ 8/11/83 8/11/83 ;/82) RECEIVED DATE Victoria Aldridge TP1-5 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C- STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 September 1, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well C-21 (32-19-11-14) PBU Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. GJP/~/pjw Enclosures cc: J. D. Hartz Geology Well File #17 Yours very truly, ~roleum Engineer SEp 0 6 .983 Alaska Oil & Gas Cons. Commission Anchorage ALASK --IL AND GAS CONSERVATION .,.~MISSION ~¢t~. WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] .. ABANDONED [] SERVICE [] ~2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-81 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20753 4. Location of well at surface 9. Unit or Lease Name 884' SNL, 1523' WEL, Sec. 19, TllN, R1AE, UPM Prudhoe Bay Unit At Top Producing Interval top of Sag R. Sst. 10. Well Number 1293' SNL, 2086' WEL, Sec. 19, TllN, R14E, UPM C-21 (32-19-11-14) PBU At Total Depth 11. Field and Pool '1414'. SNL, 2269' WEL, Sec. 19, TllN, R14E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB DF etc.) I 6. Lease SesJ~natioz~ and Serial No. Prudhoe oil Pool KBE = 67.50' AMSL' 'I ADL 28305 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions ?-13-82 ?-25-82 ?-29-82I feet MSLI One ,17. Total Depth (MD+TVD)9282 'MD 9119 'TVD 18.Plug Back Depth (ME~-TVD)19. Directional SurveY9237 'MD 9076 'TVD YES ~ NO [] I20' Depth where SSSv set2094 feet MD I21' Thickness °f Permafr°st2080 ' 22. Type Electric or Other Logs Run DIL/BHCS/CDL/CNL/CAL/GR/SP, CBL/VDL/GR/CCL, Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" x 30'Insulatec[Conductoz Surface 80., 36- 8 cu.yds, concrete 13 3/8" 729 L-80 Surface 2669' 17 1/2" 3883 cu.ft. Arctics;t II '9 5/8" 47# L-80 Surface : . 8484' 12~]/4"'. 1136 cu.ft. Class G " 130 cu. ft. Arcti~i~ T 7" 26# L-80 i 7~9_67' 9280' 8 1/2" 368 cu.¢t. C.]a.~.~ C. w/]R~ 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD , · interval, size and number) [V]~ T~Dss SIZE DEPTH SET (MD) pACKER SET (MD). · 5 1/2" 8049' 7884' Prudhoe Oil Pool Top: 9046' 8824' · ,, Bottom: 9134 ' 8909 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 9046,_9134, BKB (8824' _ 8909, TVDss) , ',.,., , . ~,.'~ . ,,. : . 27. ' "PRODUCTION TEST ' Date First Production .. l.Method of.:Operati.on.(F!owing, gas lift, etc.) August 15, 1983 Flowing · Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAs~OILRATIO .,. TEST PERIOD I~ . . . : I FIow!ubing. Casing Pressure - CALCULATED ,OIL-BBL' GAS~MCF WA'~-ER-BBL OILGRAVITY-API (corr) 'Press. 24-HOUR RATE'1~ ' '~ ' ,' :_ ' :.. , ~ , . 28. CORE DATA ,. Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ~- ' ' · None · · · A~as~,a 0it & Gas Cons.. Commissior~ A~chora~e Form 10-407 Submit i n duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS __ ..... NAME , , Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. __ , , BKB Subsea Sag. R. Sst. 8542' 8345' · Shublik 8576' 8377' Ivishak 8661' 8457' 31. LIST OF ATTACHMENTS , ,, , , 32, I hereby certify that the foregoing is true and correct to the best of my knowledge Title Date ..... //- ~, (/ ,;. - .......... INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". . 10-407 STATE OF ALASKA ALASKA( LAND GAS CONSERVATION C(' ,tMISSION SUNDRY NOTICES AND REPORTS' ON WELLS 1. DRILLING WELL [] COMPLETED WELL:xE3 OTHER 2. Name of Operator Sohio Alaska Petroleum Company 3. Address Pouch 5-612, Anchorage, Alaska 99502 4. Location of Well At Surface: 884' SNL, 1523' WEL, Sec. 19, TllN, R14E, UPM 6. Lease Designation and Serial No. ADL 28305 5. Elevation in feet (indicate KB, DF, etc.) KBE = 67.50' AMSL 7. Permit No. 82-81 8. APl Number 50- 029-20753 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number C-2! (32-19-11-14) PBU 11. FieidandPool Prudhoe Bay Prudhoe Oil Pool 7 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] - Perforations [] Altering Casing r-I Stimulate [] Abandon ' [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals were perforated August 15, 1983, using Gearhart 3 1/8" Hollow Carrier guns at 4 spf. A lubricator was instal, led and tested to 3500 psi on all well work. 9046' - 9134' BKB (Ref. BHCA/GR, 7-25-82) An SSSV was set and tested in the ball valve nipple at 2094'. 14. I hereby certify/that the foregoing is true and correct to the best of my knowledge. Signed ~//~-/~~ ~ ~'~TitleDiStrict Petroleum Engineer The spac//i~w for C om mission use / Condit~/~f Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1430 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ! ' ('~ STATE OF ALASKA C(O ALASKA OIL AND GAS CONSERVATION : MMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONST · Dri,,ing we,, ~ workove; operation [] ~)~ 2. Name of operator 7. Permit No. Sohio Alaska Petroleum Compan7 82-81 3. Address Pouch 6-612, Anchorage, Alaska 09502 4. Location of Well at surface 884' SNL, 1523, WEL, Sec. 19, TllN, R14E, OPM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 67.50' AMSL ADL 28305 8. APl Number 50- 029-20753 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. C-21 (32-19-11-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of August ,19 83... 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run E C E V E D 6, DST data, perforating data, shows of H2S, miscellaneous data See Attached 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. '~/. .= ., ... Z~,/,4/%e/' /,_ District petroleum Engineer SIGNED A~..J'~'FY~,"'~' I ~ I ~~ 1 ,~ TITLE . ,- _ . I~. _ '~1 . .. ..... ; , .... DATE ' ' f "' ' b~f le¢in du'~licate with ~he A~ask~ NOTE~ort on thi, form is require8 ¢o, ea¢ calendar month, regardless o the status of o,eratlons, and must i Oil aC Cs Conservation Commission by the 15th of the succeeding month, unless otherwise directed. / For~ ~404 Submit in dupli~te Rev. ~-1-80 PERFORATING DATA - Well C-21 (32-19-11-14) PBU July 16, 1983: Pressure tested tubing and inner annulus. August 15, 1983: Rigged up Gearhart and perforated the following intervals using 3 1/8" Hollow Carrier guns at 4 spf: 9046' - 9134' BKB (Ref. BHCA/GR, 7/25/82) Put well on production. August 21, 1983: Shut well in to prepare for static pressure survey. August 23, 1983: Ran static pressure/temperature survey at 8800' TVDss. August 24, 1983: Set and tested SSSV in ball valve nipple at 2094'. Well on production. SOHIO ALASKA PETROLEUM COMPANY 3111 "C- STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 May 9, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells B-18 through B-23 and B-25, C-18 through C-28, and D-16 through D-23 (excluding D-19) Gentlemen:. . ~. Encl'osed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. This contains our proposal to perforate the~se wells. GJP:JLH:pjw Enclosures CC: J. D. Hartz Geology Well File #17 ._Dist.~i~ Petroleum Engineer SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 82-81 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20753 4. LocationofWell At Surface: · 884' SNL, 1523' WEL, Sec. 5. Elevation in feet (indicate KB, DF, etc.) KBE = 67.50' AMSL 12. 19, TllN, R14E, UPM I 6. Lease Designation and Serial No. ADL 28305 9. Unit or Lease Name Prudhoe Bay unit 10. Well Number C-21 (32-19-11-14) 11. Field and Pool Pr udhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data PBU NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~[ Alter Casing [] , Perforations I--I Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other I-'1 Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated June/July, 1983, using 3 1/8" carrier guns at 4 spf. A lubricator will be installed and tested to 3500 psi for all well work. 9046' - 9134' BKB (Ref. BHCA/GR, 7-25-82) An SSSV will be set and tested in the ball valve nipple at 2094'. ~o~~',; , her~e ~~~' 14. rti going is true and correct to the best of my knowledge. I Sign~Z'~C~_~__ _) L~6~%_ TitleDistrict Petroleum Enqineer [ The~pace b~w ~r ~mmission use ~ ConditiOns of App~&~al, if any: ORIS~f~L SIGNED Approved by BY LONI~llE C. SMITII COMMISSIONER Approved Cop~ Returned' By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASI;A PF_T~OLEUM CO;':~PAiWY SFO ARCO 31 1 I "C" STREET ANCHORAGE, ALASKA TELEPHONE 1907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 TO: EXXON Date:_ 9~29-87 - Trans.f!: 2676 PHILLIPS CCi!: 55676 STATE OF AK CENTRAL FILES(CC#'s-Transmittal Only · PAGE 2 Of 2 REFERENCE: SOHIO MAGNETIC LIS TAPES & LISTINGS The following material is being submittbd' herewith.-Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- OH/DIFL/BHC/CN/CD/GR OH/DTFL/BHC/CN / CI)/GI~ TAPE POS, ~.-. 2/25/82 ECC 1388 '01961 t~- 8/13/82 ECC 1412 01962 OCT 1 1982 Alaska 0i! & At~chorage 32) *SFO & EXXON: An Asterisk:(*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective, service company. Please confirm this. .... · ..... ', ..... ~-'" /~ RECEIVEE~"~//'--~'/~,'/'-<'-'''"?~'j[~.[,,',z~G,.~,''/''--'/-,-¢''',- f ~'"' ~'' ,,-, Kar'en Hestas :~.~ '~ ~ ..... ~ ........ ~ ~:: ' "~! Development Geology DATE , ~/~ /~:"~ 19 Well Records SOHIO ALASKA PETROLEUM COMPANY SFO · -. . ARCO · - CHEVR6N ' EXXON GETTY. SFO/UNIT/ STATE: MARATHON MOBIL PHILLIPS ~ttal Only) ~FEREN~NTRAL FILES(CC~'s-Transmittal Only) 3i 1 i "C- ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 8-26-82 Trans.#: 2563 CC#: 55563 * Date to State Via Drilling: SOHIO OPEN HOLE FINAL LOGS '. The following ma, terial is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- 8/31/82 SFO/UNIT/STATE: C-21 Dres. DIFL #1 7-25-82 8~52-9284 C-21 Dres. BHC #1 7-25-.82 8452-9262 C-21 Dres. CDL/CNLog #1 7-25-82 8452-9238 C-21 Dres. CDL #1 7-25-.82 8452-9224 C-21 Dres. GR #1 7-25-82 7350-8444 5" & 5" & 2" 5If 5" 5" & 2" & 2" SFO/UNIT ONLY: C-21 Dres. Prolog .' #- 7-25-82 511 STATE, ONLY: DIRECTIONAL SURVEYS: Magnetic Single Shot Directional Survey Gyroscopic Directional Survey DATE ~A!aska 0il & Gas Cons. Commission Anchorage Date: 7/13-22/8~ob#: 0782-022 Date: 8/2/82 Job#:#1391 Karen Mestas Well Records Dept. Development Geology SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 August 31, 1982 Alaska Oil & Gas Conservation Conm~ssion 3001 Porcupine Drive Anchx~rage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WRLL.'C-21 ,~ (32-19'11'14) ~PBU Enclosed, in duplicate, is Form 10-407, Well Completion Report, for the above-named well together with the Well History, Well Logs and Directional Surveys. This well has been completed as a non-perforated oil well. Very truly yours, R. H; Reiley District Drilling Engineer encs cc: Well File 917 Geology AUG Z 982 Alaska 0il & Gas Cons. CommissJor~ Anchorage STATE OF ALASKA ALASKA AND GAS CONSERVATION C ,.¢IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio A~aska Petrolet~ ~y 82-81 3. Address 8. APl Number _ Pouch 6-612, Anchorage, Alaska 99502 50-029-20753 4. Location of well at surface 9. Unit or Lease Name 884' SNL, 1523' WEL, Sec. 19, TllN, R14E, UPM -~OCAT~O~¥ Prudhoe Bay Unit At Top Producing Interval top of Sag R. Sst.j VERIFIED : 10. Well Number C-21 (32-19-11-14) PBU- 1293' SNL, 2086' WEL, Sec. 19, TllN, R14E, UPM.jSurf' At Total Depth ~8. H. ~---- _ 11. Field and Pool 1414' SNL, 2269' WEL, Sec. 19, TllN, R14E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. P~oe Oil POOl KBE = 67.50 ' AMSL ADL 28305 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 7-13-82 7-25-82 7-2 9-82I feet MS L One 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set I 21. Thickness of Permafrost 9282' MD-9119' T~) 9237'MD-9076'TVD YES [] NO []I 2094 feet MDI 2080' 22. Type Electric or Other Logs Run DIL/BHCS/CDL/CNL/CAL/GR/SP, CBL/VDL/GR/CCL, Gyroscopic survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20 x 30 Insulate~] Conduc%~ ,r Surfao_= 80 36' 8 cu.yds, concrete 1.3 3/8 72# L-80 Surface 2669 17 1/2 3883' cu. ft. Arctics~,~t II '' 9 5/8 47~ L-80 Surface . .. 8484 12 1/4 1136 cu. ft. Class G , 130 cu. ft. Arctics~ :t I 7 26# L-80 7967 9280 8 1/2 368 cu. ft. Class G w/18% salt , 24. Perforations open to Production (MD+TVD of Top and Bottom and · 25. TUBING RECORD , , interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5 ]/2" 8049 ' 7884 None , ~ .: 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. · DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED , , ' ." ' .. i,. ; . . '" '- '- ,' '~, ' 27. PRODUCTION TEST , Date First Production . Method of OPeration (Flow rig, gas ift, etc ) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS]OILRATIO' , TESTPERIOD ~ . . ~ ' - ..I . Flow Tubing Casing Pressure CALCULATED,,~ OIL-BBL· - GAS-MCF WATER-BBL OILGRAVITY-API (corr) "Press. :. . . 24-HOUR RATE 28. CORE DATA . ' Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None .',' ' AUG .z .!. 1982' ,, Alaska Oil & Gas Cons. Commission " ' ' ~:' ' " ' ' ' ': ".':::¥',, . ~^nc"ora-e · Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE , 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag. R. Sst. 8542 ' 8345' Shublik 8576 ' 8377: Ivishak 8661 ' 8457 ' · 31. L~SI OF AIIACHMENIS Well History, ~11 Log's and Di.rec~ional Surveys '"3~. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title ~i~ __ . Date ...8' ~' ~"~.. ... INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this well is completed for separate production Yrom more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported · in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 W~.T. C-21 (32-19-11-14) 'PBU Spudded .well at 1700 hours July 13, 1982. Drilled 17.1/2" hole to 2680'. Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2669'. Cemented with 3883 cu. ft. Arcticset II cement. Installed and tested BOPE. Cleaned out to 2628'; tested casing to 3000 psi, okay. Drilled out to 2704'; ran leak-off test to 0.65 psi/ft, gradient. Directionally drilled 12 1/4" hole to 8498'. Ran 208 jts. 9 5/8" 47# L-80 Buttress casing to 8484'. Cemented in tw~ stages: First stage with 1136 cu. ft. Class G os~snt; second stage through D.V. packer at 2598' with 130 cu. ft. Arcticset I cement preceded by Arctic Pack. cleaned out D.V.; tested casing to 3000 psi, okay. Cleaned~ out float equipment aD~ directionally drilled 8 1/2" hole to 9282'. Ran open hole logs. Ran 33 jts. 7" 26# L-80 IJ4S liner to 9280'. Cemented with 368 cu. ft. Class'G cement with 18% salt. Cleaned out to 9237'; tested liner to 3000 psi, okay. Changed w~ll over to NaCl. Ran CBL. Ran 176 jts. 5 1/2" 17# L-80 AB M3d Buttress~ IPC tubing with 4 1/2" tailpipe assembly to 8049'. Landed tubing with ball valve at 2094'. Installed and tested tree. Displaced tubing to diesel; set packer at 7884'. Tested tubing to 3500 psi, okay. Released rig at 0900 hours JulY 29, 1982. Ran gyrosoopic 'Survey, secured and tested wellhead August 3, 1982. Naska Oil & ~as Cons. ~o~rnissior~ ,~nchorage SOHIO ALASKA PETROLEUM CO. PAD-C (,,'32.19. II-I~) C'21 Controlled LES HENDERSON 349-3114 Drilling Consultants 7608 Highlander Drive Anchorage, Alaska 99502 (907) 349-3114 J~lly 26, 1982 Mr. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502 RE: Magnetic Single Shot Survey Job No. 0782-022 Well C-21'(32-19-11-14) Prudhoe Bay Field North Slope, Alaska Date of Survey: 7-13-82 to 7-22-82 Dear Mr. Rose: Please find enclosed the "Original" and six (6) copies of our Magnetic Single Shot Survey on the above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 2700 to 8498. Thank you for giving us this opportunity to be of Service. Yours very truly, Controlled Drilling Consultants Wayland \'a~cy f' Directional h;~ pdrvi/sor RADIUS OF CURVATURE METHOD OF COMPUTATION COMPUTED FOR CDC 8Y OCEANTECH(FM L tNDSEY ECORD OF SURVEY 22 dULY 82 WELL C-21(32-19-I 1-14 ) K B ELEV. 67.50 D ¸Il DEG. · 0 ,00 ;0 $ .OOW .00 $ · 2700 0 0 2700.00 2632, SO S ,OOW .00 S .00 2803 0 45 2803,00 2735,30 854,00W ,58 8 ,29 ~6,44 8 22,99 7' ~9 8 24,96 6622 ',~30 662~,52 6554,02 864,50W ~,56 8 3f,32 847,$0U 36.76 ~ 71,90 s o,oou s 04, 7385 25 30 7355.~9 7288,09 855,50W 123,08 8 178,77 7855 24 IS 7781,97 7734,47 856,50a 233,63 S 342,67 ~' ' 8 ~ , 527,66 8 EXTRAPOLATED TO TO 8498 21 30 83,4.$5 8307.0~ S~800W 368.25 S .00 W 552,66 ~~E-CLOSUE5 664-,1..I..~FEET AT $ 56 19 26 W . CLOSURES DISTANCE ANGLE D ri .00 $ 90 0 0 W . O0 S 90 0 0 W .65 S 26 ,59 59 W 13.70 8 45 6 56 W 28.26 S 54 26 18 W 25,97 S 73 56 4 W 28,41 8 87 49 S2 W 3J ,36 S 87 9 6 W 3S,62 $ 83 23 30 W 50.47 S 72 40 31 W 80.75 S 62 55 7 W t23.42 S 57 57 56 W 177.B2 S SS 49 43 W 217.04 S 55 27 ~ 0 ~1 4~4.73 S 55 42 49 W 634,64 S 56 ~4 45 W 664.11 S 56 t9 26 W DOG LEG SEVERITY DEG/i OOFT .000 .000 .728 ,021 .023 · 029 ,033 t, 726 2,783 3,490 2,532 2,8S2 2.538 3.417 .268 .446 SEC T I~ .00 ,57 15, 28.25 24.76' 26.93 3i 48, 80,2 i 23.37 217,02 414,71 634,6~. 664. I i '21 iSINGLE ~SHOT SURVEy D~:TH i~_ OT~-O~A FOR EyER¥ jOO~FEET OF SUB SEA DEPTH, 22 JULY {32 VERTICAL CORRECT ~68, 1 O0 767, 700 t2~8 868 1868, 2468 2568 3068 3168 t300 JSO0 JgO0 30~8. 0 2400 0 2500 0 0 ~o o 3000 0 3100 0 0 0 0 0 0 0 0 0 0 0 0 0 .0 :0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL COOROIHATE$ .00 .00 .00 .00 .00 ,00 ,00 .00 .00 .00 .00 ,00 .00 ,00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 J.08 1,88 2.72 3.57 4,46 5.37 6,3! 7'.28 .00 W .00 W .00 W .00 W .00 W .00 W .00 W .00 W .00 W ,00 W .00 W ,00 W .00 W .00 .00 W ,00 W .00 tO ,00 W .00 W ,00 W .00 W .00 W .00 W ,00 W ,00 W · 00 W ,09 W ,97 W 2.01 W 3.02 W 4,01 W 4.97 W 5.91 6,82 W 7,71 W .A VERTiCAL C ORREC T i ON 3668 3668. 3600 4168 4168, 4t O0 4268 4268. 4200 4768 4768, 4700 4868 4867. 4800 5468 5467. 5968 5967. 6068 6067~ 6568 6568, 6668, $300 5400 5900 6000 6500 6600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL COORDINATES 8.26 S 8.57 9.27 8 9.40 10.30 $ 10.23 11.28 S 11.t6 12.21 8 12.21 13,08 S 13.36 I3.87 S 14,62 14.57 S 15.97 15,18 $ 17.42 15.69 S 18.94 16.08 S 20.54 16.35 S 22.20 16.39 S 23.92 I5.90 S 25.53 14.94 8 26,87 ~3.64 S 27,80 ~2.I4 S 28.24 I0.60 S 28.!6 9. t9 S 27.59 8.06 $ 26.6i 7.30 8 2S,~0 6,94 ~ 24,02 6.99 S 22.79 7,43 S 21 ,69 8.19 S 20.86 9.~7 S 20.36 ~0.24 S 20.24 11.26 S 20,49 . 9 ~ 8 25.62 ,94 8 28,57 }0.37 S 42,90 36.87 S 72.02 54.99 S 9~.38 22 JULY 82 INTERPOLATED 'VALUES, FOR EVEN 1000 FEET OF MERJURED DEPTH TOTnL COORDINATES ~ 000 { 000. '-)3~. . O0 2000 2.000. ~' 000 .... 2. ~000 ~9~ 5. 7847, 265,93 .00 .00 2.34 26,00 7'6.96 22 JUL ¥ 82 EVEN 100 FEET OF SUB SEA DEPTH, 7t82 ??29 7839 8383 VERTIC-nL ..SUB , MD~ TVD ,~ DEPTH-.SEn DIFFERENCE VERTICAL CORRECT I ON 7167, 7100 7667, 7600 7767, 7700 30 71 8267, 8200 1t5 8367, 8300 t22 7 9 11 10 10 $ 8 7 TOTAL COORDINATES 76,14 S t17,50 W 100,03 $ t47,32 W 126,30 S 183,45 W 152,99 S 222,51 W 179,18 S 261.16 W 204,86 S 299,40 W 230,03 S 337,23 W 254,62 $ 374,53 Id 2.78,48 S 411,12 W 301,60 S 446,99 W 324.00 8 482,14 W 345,69 S 516,57 W 366,77 $ 550.31 W 22. JULY 82 SCIENTIFIC DRILLING INTERNATIONAL 1111 East 80th Street, Anchorage, Alaska 99502 · 9071349-3541 · Telex: 09025364 (SDC AHG) Subsidiary of AMF INCORPORATED ATTN: SOHIO Drilling Department Please find enclosed our completion copy of the gyroscopic survey on Well C-21. If there are any questions concerning this report please do not hesitate to call our survey department. We at AMF/Scientific Drilling tnt'l, thank you for the oppor- tunity to provide this service and look forward to serving you again. Thank you, ~ Allan ~;oshall . ~ Manager, Alaska District- .EEE!VED AUG .t 982 0il & Gas Cons. Co~'r~missi~n · .~nchora~e ~OHIO:ALASKA P£TROLEUMF'~O. OYRO~COPI~ DIR£~TIONALSURVEY '~RRD.IUS OF CURYRTURE'HETHOD OF CALCULATION sURVEY RAN'BY CHRPPELL/PERRY 1 JOB · 13~1 WELL C-2:l~SEC,:lg~llN,R14E KB ELEV, SURVEY DATE 2 RUG 82 COMPUTED. FOR SDi.BY OCEANTECH(FH LINDSEY & ASSOC,)'PROPOSED DIRECTION S56-25W RECORD OF .SURVEY TRUE .MEAS,. DRI'FT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA' DIREC .... D M DEG, :0 0 ~ .~O'iO '-6;',50 S · t0'0 ?0 9 · '1'~09.0.0 32,5'0 855,'!2W 20'0 0 1'9 2'00 ..00 1.32,50 S3! ,.?3E 30'0 ~ '!7 300,.00 . 232,50 S 9,'!.~)W 40~ - O'1'0 4'0.0,~00 ':332,5'0 $36, ITE 5~ ~0 8 50'0,:~0 '432,5:0 S34,85E 60:0; ;0 4 60:0,~0 "532,5~ S39,78E 200 ~ 5 7:00,:00 '.'632,5.0 $22,9~W G:O0 ~ 1:3 8:00, :0'0 732.5.0 S43, 'I"OE 900 0 5 900,0:0 '832.,50 S21,2'0W : '10'0~. 0 5 '10~,0'0 .932,50 S67,12W '~t~O 0 1:0 '11.'~0,~00 '1.:~'032,50 HIS,20E 12e~ · 7 12'~0,0.0 '1132,5.0 -N97,5.~E 130e 0 ' B 1300,~0 1'232,5~ H79,42~ 1409 ~0 12 1.400,:0;0 1:332,50 H 9,2.?E '3500 ~0'2e '1499,99 1.~32.,49 H68., 460e ~0 8 1599,99 1:532,49 H43, t?.~0 :O 16 1699,99 1.632,49 H26, ~ 8~ ~0 22 1799,99 1'732,49 N58.'02~' 49:9e e 4 '1899,99 ..t:832,49 H65, 2:0e'e · 4 '1999,99 1~932,49 H24 21:00 ~"16 2:099,99 '2:032,49 H6.5,:05~ 22ee ~0-37 ' 2I:99,99 2132,d9 s28,12~ 230~ '~ 25 2299,99 2232,49 s36;97~ .24.~e ~0 43 2399,9e 2.332,49 .s41,07w TOTAL COORD ~NATES ,~0 S ,00 W ,11 S ,06 W ,36 S ,11 W :;?3 S ,03 U ':I,.tl $' .~06 E .. 1 .32 S ...... ** ..~:,.., -, 2 i';:"E ' 1,46 $' "-:' ':;3;1-:!E:~'' · 1.se s , 2.~07 $ '.' - ;;42!E; 2 ,.'17 S 2,~5S 1,.91 S I , 76 'S "1,55 S I ,'t? S ,95 S ,64 S ,22 S .04 S .~04 N ,25 H ,~2 H ,.73 S 1,50 S ,32 E ',lg E ,37 E ,39 E ,23 E ,.02. E . ,32 W ,53 W ,92 W '1,25 W I ,33 W 1,54 W 2,20 U 2,6~ ~ 3.31 U CL'OSU RES DISTANCE ANGLE D M S 'DOG LEG SEVERITY DEG/I O'OFT .'00 $ 90 0 O El ,'1-3 S 27 33 30 W ,37 S 16 58 55 W ,73 S 2 37 16 W 1..!1'1 S 2 53 40 E '1.34 S G 57 35 E 1.49 S 12 8 44 E '1,62 S 11 51 37 E 1.86 S '11 37 35 E . 2,11 S 11 32 49 E 2,19 S 8 29 27 E 2"06 S 5 20 .3 E 1,95 S 11 1 52 E 1,80 S 12 15 40 E 1.56 S 6 31 36 E 1,t, 7 S 0 52 4 E 1,'00 S 18 30 52 W ,83 S 39 49 30 W .95 ~ 76 49 5 W 1.25 S 88 20 51 W '1,33 N 88 5 45 W 1,56 N e.O 53 49 W 2,2.0 H 89 21 35 W 2.78 S 74 41 2 W 3.63 S 65 32 55 W .000 ,150 ,.01 ? .'117 .117 , .033 ,067 ,01 ? .133 .133 ,.065 , .093 · 050 ,01 7 · 067 ,133 ,200 · 16? · 067' ,300 .046 ,200 ,35'0 ,200 ,300 SECTI~i'~ DISTAH ,00 ,11 .30' ,45 .60 .59 · 59 ,65 ,75 °85 .. 1 , 03 ,80 ,?1 ,67 .81 ,~1 ! .04 1 . 06 1 .11 1 . 78 2,61 3,57 I , SOHIO IdELL C-21 SEC,'l~~TllH,RI4E GYROSCOPIC SURVEY .JOB # 1391 SURFACE LOCATION'884 ,SNL., "152~ WEL 26 'AUG 82 KB ELEV 67.50 FT RECORD OF SURVEY TRUE HERS· DRIFT VERT-ICAL DEPTH ANGLE DEPTH D H SUB DRIFT SEA DIREC DEG, 2508 '0 32 2499,$? 243'2,47 2600 ;0'50 2599.96 2532,45 S64,02W 2?0.0 0 .40 2699.96 2632,46 S76. 2800 .0 49 2.799.95 2.732,45 S54, 2900 · 41. 2899.94 2.032.44 3000 3 34 2999.93 2932,43 31.~0 01'41 3~99.93 3032.43 3200' '0 20; 31'99,92 3'132,42 H85,52~ 3300 · 38 3299.92 3232.42 S78,28W 3430 :0 30 3399.91 3332.4! S01,'10~ 3500 · 26 3499.9'1 3432,41 S44'.55W .36-00 3 39 35.99.91 3532.41 S6.0, 3?00 e 29 3699 . 93 3632, 40 S60,02bi 3800 · 29 3799.90 3?32,4'0 S36 3903 0 37 3899.G9 3832.39 4000 · 28 3999.69 3932,39. 41'00 ~0 41 4099.66 4032,36 S30,66~ 4200 0 4? 4199.86 4132.36 S41,47~ 4300 0 54 4299.66 4232.36 4400 :0 50 4399.85 4332,35 S52..72~ 4500 :0 51 4499,64 4'432.34 4600 3 49 4~99.83 4332,33 S52.28~ 4?03 0 58 4699.62 4632,32 S49,~8~ 4600 0 55 4799,8'I 4732.31 S54.~7~ 4900 O .52 4899.79 4832,29 S52,42~ 5000 0 55 4999,.?~ 4932,26 S52. 5100 · 52 5099,77 5'032.27 $54', ~2~0 :0 37 ~199,Z6 ~1~2,~6 G~6,1'OU 5300 0 23 5299,76 ~232.E6 S42,53~ TOTAL COORDIHATES DOG:LEG C L '0 S U R E S SEVERITY DISTANCE' ANGLE :DEG/IOOFT D M S . 2,33 S 4.01 Id 3,~6 S 4.94 U 3,5.O S 6.17 U 4,~)3 S ?,35 U 4,~3 S 8.54 U 4,78 S 9,61 U 4,76 ~ 10,68 U 4,58 S 11,55. U , 6,23 6,79 7,44 8,13 1.0,03 11.-03 1 ! ,95 · 12, ~6 1.3, 14,74 15,7.7 16,70 17.64 18,56 19,30 19,87 16,31 U '17, O0 W 1.7,64 bi · liB, 14bt 18,89 ~ '19,96 t4 21,17 bi 22,.,.32 bi 23., 46 bi 24,67 U 27,20 W 26,44 U 29.69 U 3'0,76 W 31.42 Id 4,64 S 59 48 ~6 W 5.,82'S 58 12 1.0 bi 7,10 $ 60 26 2 W 8,38 $ 61 15 3:7 W 9,67'S 62 2 51 W '10.73 S 63 31 31 W 11,69 S 65 59 19 ~ 12.,42 $ ~8 22 3 W 13.22 S 69 29 39 ~ 14.20 S ?0 12 2 ~ 14,99 S 69 48' 26.~ .15.9.0 S 68 49 30 W ~1.6,87 S 68 19 7 ~ 17..66 S 67 23 26 ~ t8.56-S 66 21 23 ~ 19,42 .S 65 15 33 ~ 20.25 S 63 36 39 ~ 21,39 S 62 1 41 ~ 22.61 S 61 4 '16.~ 24,31 S 60 32 45 W 25.76 S 60 3 29 ~ 27,20 S 59 36 54 ~ 28,74 S 59 8 0 W 30.37 S 58 43 32 U 3].92 S 58 27 31 U 33,4? S 5~ ~1 6 U 3S.02 $ 57 59 3 W 37,17 $ 57 41 25,~ ,183 ,300 ,1&7 .15,0 .1 33 ,,117 ,117 ,' 350 ,300 ,.133 , .067 ,217 , '167 ,195 .133 ,150 ,217 .100 . '117 .067 ,:017 , ,,033 .150 .050 ,'050 · ~050 , OSO .,2~0 ,233 SECTZON DISTANCE . 5.81 7.06 6,32 9.59 1 0.60 11,46 12. ~06 12.78 13,6.7 · .. 14,47 15.41 16.39 1 7,23 18,17 20; 21,21 22,66 24 ,:18 25..64 27, '1.0 28,65 30,29 31 ,84 33.40 34.96 36,2~ 37,12 SOH!O IdELL C,21 SEC, 1 '9., T11H,, R 14E GYROSCOPIC SURVEY JOB'# 1391 SURFACE LOCATION 884' SHL., 1523 WEL 26 AUG 82 KB'ELE¥ 67.50 FT RECORD OF SURVEY TRUE MEAS, DRIFT"VERTICAL DEPTH ANGLE DEPTH D M SUB SEA DRIFT TOTAL COORDINATES DIREC ~ DEG, 5480 O 16 5399.76 5332.26 823.. 95E 5500' 0 33 5499.75 5432,25 N49,82E 5600 9 33 5599,25 5532.25 N39,17E 5700 0 3t 56~9.74 5632.24 N44 ..73E 5800 ~ 35 5799,74 5732.24 .N20.35E 5900 ~ 26 5899.74 5832,24 N22,45E 6000 :0 40 5999,73 5932.23 N 2.33E 6I~0 .0 29 6099.73 6032.23 · 2~0 ~ 31' '6199.72 6132,.22 N 1,,08E · 30~ 0 23 6299,.72 6232.22 6400 'O 27 6399.72 ~332;22 .~58~ · 34 6499.71 6432,21 N81.13W 62.00 6 14 6699.30 6631,8~ 851, 6800' 9 2l 6798,32 6730.87 S47.43W 6~e 12 5 6896.61 6829.11 S46.65W 7000 14 41 69~3,69 6~26.39 71'0~ '17 34 7089.94 7~022.44 S49. 7~0 20 24 7164,5'0 7117,0'0 73~0 23 13 7277.33 7209,83 S52. 7490 26 .9 7368.24 7~00,74 7500 26 46 7457.82 7~90.32 S54.22~ 76,00 25 40 7547,53 7460,03 S59. ~7~0 25 7 7637.67 75.7.0.37 S53 ' 67W 7880 24 45 7728,55 7661,05 7900 23 55 7819,67 7752,~7 S53.02~ 80.00 23 11 791 I , 34 7843, e4 S53., 8t80 22 54 8003.,36 7~35,86 S54~'17~ B2oo 22 38 8095,57 8028..07 $53. CLOSURES DISTANCE ANGLE D M 'DOG!LEG SEVERITY DEG/IOOFT 2:0,4'0 S 31 , 5.0 id 2!0,53 S 30,90 bi 19.85 S 3.0,23 W 19,16 S 29.61 '18.36 S 29.'1:0 W 17.53 S 28,77 W 16,60 S 28.., 57 15., 61 S 2~,39 14,76 S ..28,25 '13,99 S 28,11- 13,30 S 28,22 · , . . 12,85 S 13.27 17.54 S ~ 39.15 26,39 :g 49.4'1 39, ~06 54,75 S 8.0,03 73,04 S 1 93,83 S 125., 94 It6,90 S 1'55,05 141,89 S 18~.35 167,95 S 224.34 192.95 S 261.35 215,60 S 297,1 240.7e S 330.97 265.57 S 363. 289.45 312.52 $ 427.53 335.27 S 458.84 37,53'S 57 4:42 .id 37,10 S 56 23 49 W 36.17 S 56 42 37 W 35.27 S 5.7 5 44 bt 34.40 S 57 45 17 Id 33,69 S 58 3;) 57 bi 33,;04 S 59 5'0 44 Id 32,40 $ 61 11 35 W 31.87 -g 62 25 5 W 3~,39 $ 63 32-44 ~ 31,~9 S 64 46 6 ~ .31,68 S 66 3 5e W ~ 34,.79.S 67 34.22 ~ 42,89 S 65 52 4 W 56.01 S 61 53 31 W :74.'14 S 56 '12 24 W 96,96 S 55 37 13 id 124,58 S 54 6 12 W 157.05 S 53 16 46 W 194,18 S 52 59 6 W 235,02 S 53 '0 30 W 280.25 S 53 10 48 W 324,32 S 53 4'1 2.7 W 367,13 S 54 2 13 W 4'09,29 $ 53 57 52 W 450,49 S 53 52 37 W 490,44 S 53 49 48 Id 529.58 8 53 50 ~0 Id 568.28 S.53 50 41 W' . '11 ? ,284 · 1 O2 ,033 .067 · 150 ,233 ,183 ,033 ,133 , 067 ,117 2,619 3,055 3,'118 2, ?34 2,601 2,887 2,838 2, e24 2, e'02 .768 I ,500 1 .210 . 385 ,833 ,739 ,297 ,271 SECTION DISTANCE 37, 37, u9 36,14 35,23 34,35 33,61 32, 32,1 9 31 .57 31 ,.el 30.70 31 . :05 33,90 42 .~07 55.56 73,99 '96, ~ 1 24. 157,'-01 1.94 ..1 !0 235, .7.3 280,16 324,28 367,12 409,26 45 O, 45 49 O, 40 529,53 568,23 SOHIO WELL * C-21 SEC., J 9., Tt ]H.,R14E 'GYROSCOP'IC SURVEY' .dOB ~* t3-91' SURFACE LOCATION 88'4 SHL~, 1523 WEL 26-AUG 82 KB*ELEV 67.50 FT RECORD OF SURVEY TRUE MEAS,' DRIFT .VERTICAL SUB DRIFT DEPTH' ANGLE DEPTH SEA DIREC D H DES, TOTAL COORDINATES CLOSURES D ZSTANCE ANGLE D H $ DOG LEG SEVERITY DEG/IOOFT · B300 22 ;15 8l'8B.00 8'12'0,50 S54.23~ 8400 21'56 8280,65 ' 8213,15 S54.70~ 8500 21 37 8373,52 83'06,02 S55,6:0~ 8640 2,0 '16 8466,91 B399,41 S56,02~ .$800 1'? 42 8655.31 8588,81 S56.25W 9000 '16 18 6847.57' 8780.07 S56.35id 9100 1'5 31 8943,74 8876.24 $57.15W THE FOLLOId[-HG I.$ E~TRAPOLATED TO TD 357'69 S 489,74 379,55 8 529,34 439,1~ S ~ ~07,97 456,29 S 4.?2,94 'S 488,92. $ 503,95g . 9282 15 31 91'19.'1~ e051.61 $57.15id 530.36 5 1533.87 Id 1682,35 Id . , -~_. 388 323 ,339 ,351 802 768 718 ,685 ,785 ,000 BOTTOH HOLE CLOSURE 9'15.46 FEET AT S 54 35 45 W. .SECTION DISTANCE 606. ,~0 644 ,:01 681 , 10 71 6,84 7'49 ..98 781, O0 01 '0,8 0 $39.43 ~66,82 9'15.46 SOHIO ~JELL C-21 GYROSCOPIC :SURVEY JOB ' ~' "1391 SEC,,'lg~ TIIH~,R14E SURFACE LOCATIOH e84 SNL,, .1523 .tdEL MEASURED DEPTH AND' OTHER DATA FOR 'EVERY :EVEN '*t:O~ 'FEET OF SUB SEA DEPTH, 26 AUG 82 KB ELEV 67,5~ FT TRUE MEASURED '¥ERT ]~CAL SUB MD-TVD YERT-ICAL DEPTH ..DEPTH SEA DIFFERENCE CORRECTZOH TOTAL COORDZNRTES 168 268 368 468 568 668 768 868 968 1~68 1168 1268 .1468 1568 1668 1766 1868 1968 2068 2268 2368 2468 2568 2668 2868 2968 3068 3169 3268 3368 ..3468 168, 268, 367, 567, 668, 768, B67.. 968. 't :068, 1167. :1268. 1:368. ,1468, .156? .. ~1.668. '!,768, .1-86.?, 1967. 2'068, 2168, 2267, 2368. 2467. 2568. 2667, 2768 .. 2867., 29.67., 3~068. 3167, 3266, 3367, 3467.. -68 1 00 0 2:00 3.00 .0 4 00 0 500 '0 6:0-0 .700 · 900 0 900 0 1.000 · 11-00 .0 12 O0 '0 13 0:0 0 1400 0 150-0 0 16.0.0 0 1 7.00 0 1800 0 ! 9.00 .0 2000 0 21 O0 0 2200 0 23 00 .0 24 O0 · 2500 2600 .0 27-00 0 280'0 ~'0 2900 '.0 3'.0:0.0 !0 3'!'0'0 320:0 :O 330.0 0 34'00 .0 0 ~:0 0 :0 :0 ~O ~0 :0 0 ~0 ~0 -:0 O :0 ~'0 ~0 ,:0 ~0 :0 ~0 0 :0 ~0 ~0 0 :0 ~.0 ..0 'l ..~)~ .27 ~59 1.02 I .42 1,54 '1,73 2,'15 1,92 ..... ... , 2,01' · t.-~.;~:. 1.65 j-~.~ ..,,~.,., 1,32 ..... ' ':" 1 .~2 i: :_".':i :':: :;!: , .34 ,06 ,.0! o17 ,.21 .,53 '1..2'1 2,:09 2,83 3.4~0 3.B~) 4,44 4,7!0 4,84 .4,6.0 4.59 4.., 76 5,.01 ,00 .13 . .03 ,00 ,16 .29 ,34 ,33' ,45 ,36 ,21 .30 ,44 .,25 ,39 .25 .45' ..?'6 '1.19 1,31 '1,43 · !. 97 2,53 3; 06 3.81 4.57 5,79 6,96 8 .'16 1.0,31 ! 2.06 3.07 13.,e8 U E E E E E E E E E E E SOHIO'WELL C-21 GYROSCOPIC SURVEY .dOB # 139'1 SEC,1.9~TtlN,R14E SURFACE LOCATION 884. SNL., t523 UEL MEASURED DEPTH fiND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB'$ER DEPTH, 26'flU082 KB ELEV 67,5'0 FT TRUE MEASURED .VERTICAL SUB MD-TVD VERTICAL DEPTH ·.DEPTH SEA DIFFERENCE CORRECTIOH TOTAL COORDIHATES 3568 3568, 350·0 3666 366.7, 3690 3768 3.768, 3700 3868 3868. 380.0 3968 3967, 3900 4068 4068, 40:00 4168 4'168, 41'00 4268 4268, 4200 4368 4367, 4300 4468 4468, 4400 4568 4567., 4500 4668 4669, 4600 4768 4767, 4700 4868 4667, 4800 4968 4968. 4900 5068 5067, 5000 5168 5167, 5'10'0 5268 5267, 5200 5368 5367, 5300 5468 5468. 5400 5568 5568. 5500 5668 5667,. 5600 57~8 '. 5760, 5700 5868 -5867, 5800 5960 '5968. 590'0 6.068 64)67. 60.00 6'168 6168, 61'00 6268 ~ 6267,' 6200 6366 6368. 6'300 6468 6468. 6400 6568 6~60. 6500 6668 6668. 66:0-0 ~769 6?6?. 6700 6870 6867, 6000 6973 6967, 6900 0 ,0 0 0 '0 0 ,0 0 0 0 0 0 :0 0 0 0 :0 0 .0 0 .0 0 0 0 :0 :0 0 0 1 2 5 ~0 · · ~0 0 ~0 . ~0 ~0 :0 4) 0 :0 0 :0 .0 ,0 ~0 O' 1 '1 3 5,56 6,58 7,24 7,89 8,68 9,70 10.72 11,66 12,56 1.3.4.7 14,4'0 .... 15,45 16 40 ' 1.7..- 33"S 10.;28 '19,70 2:0.24 2.0,6.0 20,.'08 "19,37 18,65 1.7., · 16,95 '15, 89 15,:04 14,2~ '13,62 'I 2,95 '1.5-. ?:0 23,18 34.94 5:0.. 22 t4,53 Id 15 .'.43 td '16.13 U 16,74 U 17,49 Id 17,95 bi 18,62 19.58 W 2.0.79 21.95 td 23; 10 24,26 25,54 26.81 U 28 ,.03 W 29,29 to 3'0.45 31.25 to 3't. 55 .tO 31,16 30.43 tO 29.8t tO 29.23 tO 28.87 tO 20.61 28,47 28,27 28.18 27,81 28,67 30.67 36,54 45,82 56.63 U .75 ;04 SOHIO WELL C-21 GYROSCOPIC SURVEY ~OB # 139'1 SEC. Ig.,TII. N,RI4E SURFACE. LOCATION 884 SNL~ 1523 WEL MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN I:0!0 FEET OF SUB SEA DEPTH. 26 AUG 82 KB ELEV 67,5~ FT TRUE HERSURED VERTZCAL. SUB MD-TVD YERTICRL DEPTH DEPTH SEA DIFFERENCE CORRECT[OH 7.077 7{)67. 700:0 9 7182 ;'167, 71.00 14 7289 7267 · 72 01) 21 7399 736.8, 7.3:00 31 7511 7467. 7400 43 762~ 2567. 7500 S4 7733 ~ 7667, 7.600 65 .7,e43 ~2~7, 7700 75 7952 7~67, 7800 84 ~61 7967. 7900 93 ~170 8067, 800'0 102 8278 81 67, 81 O0 1 1 '0 e386 8267. 8200 I l e 8494 8367, 8300 126 96,01 6467. 8400 133 e7~7 9567. 95,00 139 8812 8667, 86 O0 144 891 6 8767, 8700 148 902 ~ 8867, 880.0 1 53 ~125 896~. 8900 '157 9228 9.068, "9~0.0 160 TOTAL COORDINATES 4 7 '1~) 12 '11 :1:1 "1~0 9 9 8 66,52 89.89 1'1 4,33 14 I, 68 170,77 196.97 223,82 251.49 2.7-9.17 303,60 · 32a, 35 352,77 4 5 4 3 475.63 492,12 507.,53 522.,59 S .S S S S S S S $ S S S S S $ $ S S S S 95.64 W '121,11 W 151 . 75 ~ 188,07 W 228,29 W 269.54 W 308.29 W 345.20 W 38:0.71 ~ 449.36 W 4.82,91 W 516.01 W 548.81 W 580,53 W 609.71 W 636,82 W 662,54 W 687.17 W 71:0.82 U '.734,14 U SOH];O IdEi..L C'21 SEC,,..19~. T ! 1N,Rt4E GYROSCOPIC SURVEY ,JOB ~ 13-9'1 SURFACE. LOCATION. 884 SNL, 1523 WEL INTERPOLATED VALUES FOR EVEN 1:000 FEET OF MEASURED' DEPTH. TRUE HERSURED YERT'tCAL SUB DEPTH .DEPTH SEA TOTAL COORDIHRTE$ -'4 O. -68. 1 GO0 1~:0!0, 932. 3~ 3~0:0. 2932. 4~:0 4~, 3932, 50.0~ 50~, 4932', 6~00 6~0~. 5932. ?~0:0 6994. 6926. 9~00 8848. 8780. 2.17 .04 4,,?.e 8.13 1,7.64 54,75 289,45 488.92 26 RUG' 82 KB ELEV 67.50 FT HORIZONTAL VIEW · .......... ~- SOHIO ALASKA PETROLEUM CO. (~ ' WELL C- 2 I ~ RADIUS OF CURVATURE .... : , OYROSCOPIC SURVEY ....... K.B.E. = 67;50' -' - i SURFACE LOCATION IS - _.884;_SNL,. !525'. WEL, .... ' .... ~ ,- , SEC.! 19, ;1',~ IIN., R. 14 E., U.M. '. i :; SCALE=. '=. I000' '~ ............ ~ .... : AUG.~ 26, 1982 : i CLOSURE S 54°~:56' W ? 915'~ ' ..... :_.~ ......... : --, ......... -' TMO =.gtst ~-~o~ ..... 1523' ALL DEPTHS SHOWN ARE .TVD · T. IIN.~ R. 14E.,U.M. 18 17 19 20 · · Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. Operator, We]~l Name and Number Reports and Materials to be received by: %-~ ~- Date Required Date Received Remarks Ccmp letio n Report Yes We11 History Yes ,, , , ...... ~ , Core ~scription ,, , ...... , . . Registered Su~ey Plat .... _ Incl~n~o~ Sudsy ~ "~¢~ , ,, ~ ___Dire~i°nal. .... ~ey . y~ _pi ~'-'~ 1--~ ~ ~. ~ ~. ¢, Drill St~ Test Returns M/d ~~" ~'[:' , _ , ,, , Pr~u~ion Test Re~s ~s R~ ,' Yes TI:IRU: Lonnie C. Smith ~.¢~ Commi s sioner FROM' Edgar W. Sipple, Petroleum Inspector MEMORANDUM Stale of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION TO: C. ~.~~.~rton DATE: July 27, 1982 Chaia~ n~ F~LE NO: 108A/O TELEPHONE NO: SUBJECT: Witness BOPE Test on Sohio ' s C-21 Sec. 19, TllN, R14E, ~iUP Permit No. 82-81 Nabors Drilling 26E Thu.rsda¥, July 15, 1982 - I left Anchorage via Alaska ~r'l'i~s for ~ru~0e ~y. upon arrival at sohio's C-21, Nabors Rig 26E was i-n the process of running casing. The BOPE test com~nced 'at 10:45 p.m. and was concluded at 1:15 a.m. There were no failures. I filled out ~e A.O.G.C.C. BOPE test report ~hich is attached.. In summary I witnessed the BOPE test on Sohio's C-21, Nabors Drilling Rig 26F. 02-00 ! A(Rev.10/79) 4/81 .. ~, STATE OF ALASKA Oli : CAS 09~IoLRVAI.[~ '!~ CC~tMISSION B .O.P.E. Ins[~cb ion ~te _ · :,Ope rator SD/~z o Wel 1 C- 2. / Location: 'Sec :/~._ ,T// ! N f Frillinq Contractor. · _,;VA~6m~ location, General ... ~. ~ Wel 1 Sign OK Ceneral Houseke ,eping_~__~ ..... ?eserve pit ,- Rig _ o & BOLE' Stack · i,~ 1~3~ ,Preventer- Pi~. ~ ' ' ~ ~ Blind.Pa;ns. :.Test Results: Representative. 7~.~-~ ~ Permit ,~ ~"-Z-'--~ / /~/~Casing Set ~ 2~ ~ . ACCU~%EA~R SYS'~M Failures, ft. I Test Pressure. Full CJ]arge. Pressurc___~_/OO psig Pressure After Closure /~OO psig. .k~,p i.cr. clos. pres. 200 psig... Full Chalx3e Pressure Attained:,, '~"':'"' ~ l So . ps ig · Controls: ~aster__ ~emo. ze :.,~.. ...... ~!±n.ds.:'.'.'sw±~d..t cove: . ... Kelly and Floor SafeW :V,~!Yes..- Upper Kally..,.L--cJ~, ' Test 'press..ulr..( % ooo ~-'~r Kelly_ °Lf_~Test'::Pres~e .. ., ..',:;:,&:....', ~ooc; ' Ball Type_ o/l, , ,TeSt?, ~ Oo o Ins ide BOP~est ~do o Choke ~nifold Test Press, ~'0o0 No. Valves ~1.~ /3~. ~.. NO. 'f]anges_ ~_.' N~j ustable' ~%okes I~fdrauical. ly operated choke _J ,_ -. Repai~r..or'Replacament of failed cquipment to >be made within_.-rD --~ys and _ Inspector]Ccmmigsion off ice n~otified .- --" Remarks Distribut ion orig. - BO&fCC cc - Ope_ r~tor cc - Supervisor 4/8]. {" STATE ALAStCA 011, & CAS B.O.P.E. Ins[~ction Operator ~ z¥-~ o well ~- Z, t location: Sec .~/'~ Fril linq Contractor Location, General Wel 1 Sign ~ Ceneral Housekeeping -- z .......... - .-21 .- ' --3--~:-'.2.----JL5 Rci)resentative ~i.pC~ ~ .TfJ/'IR '-i/~ M "'//;?:" t?'['~' Casing Set @ ~.~ ~ ~ ~ .. I~essure After Closure~'~:9 psiq ft. Peserve pit .... Test Pres sure POPE stack ,, ,155ul~ Preventer Pipe Rams Blind Rams / zj$/o( ~ Choke Line/Ualves ~ ,%. ~) .w ..i:: 7 :.. 9 :' ~oCoRo Valve Kil 1 Line Valves 0 Check Va lve~ ~/~ c K ~u~,~) incr. clos. pres. 200 psig. .('.~) rain Full Cha~.~e Pressure Attained: . ~ min~,S ~sec. Controls: F~aster ~Z:~. ~ . :~/->. :' '.,,, .... KeZly and FZmu Safe~, VaZves · Upper Kal ly. , ~_~...-t. Test Pressure. ~'r }<el 1y p.,.L__~est ~11 ~p ', Test l~essure Choke k~nifold ~. Val%~s ~ Test Pressure No. flanges Zo~ AJj t~table Chokes.. ._ , j I~fdrauica!ly operated choke. Test Results: Failures '--- 0 .......... Test Time: ~ hrs.~:~% Repair or Replac~en~ of fa~l~ ~uipmn~ ko ~ ~de w~kh~n .... ¥~,_~ys .->%./,/ ,, DistrJJ0ut ion ,orig. - BO&CCC cc -OFm_ rator cc - Supervisor June l, 1982' Mr. 1t. tl. l~eiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-$12 Anchorage, Alaska 99502 Re ~ t~rudhoe Bay Unit C-21 Sohio AlaSka Petroleum Company Permit No' 8:1-81 Sur. Lee. 884tSNL, 1523t~L, Sec 19, TIIN, l~14B, UPM.' Bi,cie Loc. 150$*SNL, 2462'~L, See 19, TI1N, F~14B, U~. Dear Mr. Reiley: ~nelosed is the approved application for permit to drill the above referenced well. l~e. ll samples and a mud log are not required. A continuous directional su~-vey is required~as per 20 AAC:25.{)50(b)(5). If available, a tape eontatnin~ the digitized 1o~ information shal I be submit ted on all logs~ for copying except expe~t~ntal lo~s, velocity surveys and dip~eter surveys. ~any rivers in Alaska and thei= draina{~e s~stems have been classified as important for the spa~ntn~ or t~t~r~tion of anadr~us fish. Operations In these a~eas a~e subject to AS 16.05.870 and the regulations pr~ul~ated thereunder (Title 5, Alaska A~intstrattve C~e). Prior to e~enein~ operations you ~y be contacted by the Habitat ~ordtnator's Office, Depart~nt of Fish and Ga~e. Pollution of any waters of the State is prohibited by AS 46, C~apter 3, Article ? and the regulations p~o~ul~ated thereunder (Title I8, Alaska Administrative Code, Chapter ?0) and by the Federal ~ater Pollution Control Act, as amended. Prior to comr~encin~ operations you r~ay be contacted by a representative of the Departaent of Environmental Conservation. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a representative of the Com~dssion may be present to witness [~ir. R. H. Reiley Prudhoe Bay Unit C-~l -2- June I, 1982 testing of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. - Ver~ truly yours, C. V. (Ynatterton Chairman of Alaska Oil and Gas Conservation Commission Eric 1 o sure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. CVC~ be SOHIO ALASKA PETROLEUM COMPANY 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 May 27, 1982 Alaska Oil & Gas Conservation Con~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton WELL 'C-21 (32-19-11-14) Enclosed are the following documents, in triplicate, for the above-named well together with our check for $100.00 to cover the permit filing fee. 1. Application for Permit to Drill; 2. Proposed Drilling Program Outline; 3. Blowout Prevention Equipment Diagram; 4. Surveyor's Plat showing well location; 5. Directional Map. If you have any questions, please contact either myself at 263-5183 or Karl Kolthoff at 263-5176. Very truly yours, encs cc: Well File #17 R o H. Reiley District Drilling Engineer STATE OF ALASKA ALASKA AND GAS CONSERVATION C ' IlSSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE ~ MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 884' SNL, 1523' WEL, Sec. 19, TllN, R14E, UPM At top of proposed producing interval (target) 1400' SNL, 2300' WEL, Sec. 19, TllN, R14E, UPM At total depth 1508' SNL, 2462' WEL, Sec. 19, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF etc.) Est. KBE = 70.0' AMSL 6. Lease designation and serial no. ADL 28305 9. Unit or lease name Prudhoe Bay Unit 10. Well number C-21 (32-19-11-14) 11. Field and pool 12. Bond information (see 20 AAC 25.025) Type Blal~et Surety and/or number Safeco InsureD. ce 2975387Amount $200,000.00 13. Distance and direction from nearest town I 14. Distance to nearest property or lease line NW of Deadhorse 15 miles I East of ADL 28285 2665 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 9473 ' ~-9133 'TVD feet 2480 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 6500 feet. MAXIMUM HOLE ANGLE 30.~I (see 20 AAC 25.035 (c) (2) 15. Distance to nearest drilling or completed well C-1 1600 feet 18. Approximate spud date July 20, 1982 3300 . psig@ Surface 4390 ,,psig@ 8800 ft. ~ {TVD) 21 Proposed Casing, Liner and Cementing Program SIZE Hole I Casing 36 ~20 x 3( 17 1/2 13 3/8 12 1/~ 9 5/8 Weight Inst~l at 72~ 47~ 26~. CASING AND LINER Grade Coupling :ecl Conductor L-80 Butt. L-80 Butt. I L-80 IJ4S 22. Describe proposed program: Length 80' 2680' SETTING DEPTH MD BOTTOM TVD 110'~ 110' I 2680'I 2680' M D TOP TV D Surface Su.r~ace 8458' Surface 8458'1 8328' I I 9473'11 9203' I 7958'1 7826' t 1515' QUANTITY OF CEMENT (include stage data) ~3%2Q, cu. ft. 1136 cu. ft. Class G 130 cu. ft. 368 cu.ft. Class G' See proposed drilling & cca~letion program attached. 'RECEIVED MAY 2 81982 Naska 0ii & Gas Cons. Commission Anchorage ).1 hereby cer~fy that the foregoing is true,nd correct to the best of my knowledge I/.L 14 District Drilling Engineer The space below for Commission use CONDITIONS OF APPROVAL samples required Mud log required I-~YES ~JO []YES ~LNo Permit number Approval tt/~'~ ' / APPROVED BY Form 10-401 Rev. 7-1-80 Directional Survey required I APl number [~YES [~NO [ 50.0 L?-Z SEE COVER LETTER FOR OTHER REQUIREMENTS June 1, ,COMM ISSI ON ER DATE by order of the Commission Submit in triplicate W~.T, C-21 (32-19--11--14) PROPOSED Dt~TT.T.TNG AND CC~~~ PROGRAM Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 8 cu. yds. concrete. Drill 17 1/2" hole to 2700' and cemmnt 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Arcticset II cement. Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams and annular preventer from 13 3/8" casing point to T. D. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Max~ possible surface pressure is 3330 psi based on a gas column to surface frcm 8600' TVDss and an oil coltm~ to 8800' TVDss. Vertically drill 12 1/4" hole to 6500' TVD and directionally drill 12 1/4" hole to 8328' TVD. Run 9 5/8" 47# L-80 Buttress casing to 8324' TVD and cement first stage with 1136 cu. ft. Class G ce~_nt. Cemmnt second stage through D. V. packer collar at 2600' with 130 cu. ft. Arcticset I cement. The 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T. D. at 9203' TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 368 cu. ft. Class G cement with 18% salt. Run 5 1/2" 17# L-80 A/B Fbd Buttress IPC tubing with 13 gas lift mandrels and a production packer .assembly at 7852' TVD. A subsurface safety valve with dual control lines will be placed at 2110'. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. perforations to be sutmtitted on Sundry Notice to follow. Details of proposed 2 $19B2 Alaska Oil & Gas Cons. Commissio~ Anchorage 5000 PSI WP Jl I II DRILLING ANNULAR PREVENTER PIPE RAMS BLIND RAMS KILL LINE DRILLING SPOOL CHECK GATE .GATE GATE 4" CHOKE LINE HYDE. ASST. GATE PIPE RAMS RECEIVED MAY 2 81982 At~ska Oil & Gas Cons. CommJssJoll Anchorage 04 !3 25 30 PAD DETA!L SCA[_E , ~: 4;:)0 RECEIVED MAY 2 81982 A~aska Oil & Gas Cons. Com~ssJon Anchorage , CHECK LIST EOR NEW WELL PERMITS Company Lease & Well No. IT~ APPROVE DATE (3) Admin (~ thru 11) (4) Casg ~~. ~-t-~'-'l (12 thru 20) 1 1 1 (21 thru 24) (6) Add: 1. Is the pemnit fee attached ..................... 2. Is well to be located in a d~i~'po~i'.iil.., i ii''' '' ' i ii' 3. Is well located proper distance from property line · .......... 4. Is well located proper distance from other wells .... 5. Is sufficient undedicated acreage available in this pool .......... 6. Is well to be deviated and is well bore plat included ............. .7. Is operator the only affected party ............................... 8. Can permit be approved before ten-day wait ........................ YES NO 9. Does operator have a bond in force .................................. ~ 10. Is a conservation order needed ...................................... 11. Is administrative approval needed ................................... · 3. 4. 5. 16.' 17. 18. 19. 20. 21. 22. 23. 24. 25. Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons .............. .. ..... Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ...... ...... Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... ~ Are necessary diagrams of ~ and. BOP equipment attached ..... "...~ Does BOPE have sufficient pressure rating -Test to ~5"'~ psig .. ~ Does the choke manifold comply w/AP1 RP-53 (Feb.78) .................. , , Additional requirements ................... ~ R~MARKS AdditiOnal Remarks: Geology: Engine. ering: rev'.f 01/13/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. PROGRAM: LISCAN REVISION: 5.1 PART NUMBER: W5790-PE32 Start of execution: ~r± 11 NOV 88 10:05e **** REEL HEADER **** LIS 88/10/20 ATL4S 01 LIS CUSTOMER FORM&T TAPE **** TAPE HEADER **** LIS 88/10/20 3569 01 3 PaSS CN/MS FILE # 1 PASS 1,00! **** FILE HEADER **** 1024 CN WN FN COUN STAT : STANDARD ALASKA PRODUCTI : C-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CURVES : NAME CODE SAMPLE# UNIT 1 GR 68 1 API 2 TTEN 68 1 LB BYTES 4 4 4 SPD 68 1 F/MM 4 5 CCL1 68 1 VOLT 4 6 CCL 68 I VOLT 4 7 SSN 68 I CTS 4 8 CSSN 68 1 CTS 4 9 LSN 68 1 CTS 4 10 CLSN 68 I CTS 4 11 CN 68 1 PCT 4 12 ~NC 68 I PCT 4 * D~T/~ RECORD DEPTH CCL1 CLSN 9201.000 2.000000 8.901997 9151,000 0.0000000 11,21099 9101.000 1.000000 13,10908 9051.000 3.000000 15.68529 9001.000 3.000000 15,59177 8951.000 3.000000 26.32657 8901.000 3.000000 40.20549 8851.000 4.000000 44.05908 8801.000 3.000000 32.94604 8751,000 3.000000 28.62463 8701.000 1,000000 35,21344 8651.000 4.000000 ~ ~/,~0 (TYPE# O) GR CCL CN 34.943415 2.000000 I 5. 25704 29.78528 0.0000000 34,40770 20.62335 1,000000 30.62514 17,05853 3,000000 26.59380 18.26631 3.000000 28.69963 18.56009 3,000000 15.39878 15,28207 3.000000 11.36090 16,94600 4,000000 10,12994 15.05025 3,000000 12.37409 26.19576 3.000000 15.26796 19.71358 t.000000 11,95638 84.90034 4.000000 "')/, 994 BYTES * TTEN SSN CNC 622.1377 148.0972 12.96257 773.64tl 197.4814 31.02985 762.3101 204.1689 27,40248 734.5977 218.3349 23.56841 741 .8945 200.7619 25.56709 741, '3086 252,6143 1,3 · 09356 744,9578 317.6895 9.377659 747,8821 285,8889 8.251404 727.4700 249.2816 10.30696 723.8594 287.5571 12,97267 717.1750 254.2670 9,923586 701.0781 265.2400 TEN CSSN 91 .49086 148.0972 66.90451 184.5840 -38.75391 194.6600 -68,95012 209.6028 -63,59525 217,4917 -58,26201 246.8102 -65.81963 319.4812 -59,63359 333.0874 -63.31 526 272.9146 -62.91116 264.9141 -67.33730 287.1333 -68,14677 222.0637 SPD LSN 22,99770 41 .82368 22.73080 59,43773 22,67090 66.49164 22.99770 80.59958 22.99770 59,80002 22,87109 108.0972 22.99770 159,8095 22.99770 129.6526 22.99770 105,4003 22.99770 140,0164 22.99770 117.6195 22,99770 105,3609 8601. 000 66.1 6878 700. 8596 3 · 000000 3 . 000000 I 80 · 31 I 5 I 2.71 647 33.01 260 29.68861 8551.000 45.46408 703.5901 1.000000 1.000000 275.7603 30.13420 13.94374 11.75075 8501 . 000 70. 98982 694. 0713 O. 0000000 O. 0000000 1 I 1 . 2099 4. 38191 5 74.61 447 71 . 37552 8451 .000 55.72502 685.6670 1 . 000000 1 . 000000 I 29. 6668 3.31 4976 107. 2870 1 06. 5689 -69.63976 200.7994 -66.00203 265.5291 -62.73120 131.8894 -65.86963 126.4146 22.99770 51.40564 22.99770 127.5361 22.99770 20.84621 22.99770 21.17220 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 84 9201.00 ENDING TAPE DEPTH = $409.00 FILE ~ 2 PASS 2.002 **** FILE HEADER **** 1024 FO ON TA 12 RMAT RECORD (TYPE# 64) E DEPTH PER FRAME PE DE PTH UNIT : FT CURVES : NAME CODE 1 GR 68 2 TTEN 68 3 TEN 68 4 SPD 68 5 CCL1 68 6 CCL 68 7 SSN 68 8 CSSN 68 9 LSN 68 10 CLSN 68 11 CN 68 12 CNC 68 SAMP 1 1 1 1 1 1 1 1 1 1 1 1 LE# UNIT API LB LB F/MM VOLT VOLT CTS CTS CTS CTS PCT PCT BY 4 4 4 4 4 4 4 4 4 4 TES * DATA RECORD DEPTH CCL1 CLSN (TYPE# O) GR CCL CN 994 BYTES * TTEN SSN CNC TEN CSSN SPD LSN ! 0.0000000 8.901997 9151.000 3.000000 14.94191 91 01 . 000 4.000000 13,5239'; 9051.000 5.000000 16.03481 9001.000 1.000000 14,46042 8951.000 3.000000 24.54509 8901,000 I .000000 42.06068 8851.000 2.000000 46.10982 8801,000 3.000000 31.54945 8751 .000 3.000000 26.65329 8701,000 3.000000 34.47922 8651.000 4.000000 16.47246 8601.000 3.000000 13.63704 8551.000 3.000000 29.76767 8501.000 3.000000 5.289317 8451.000 1.000000 3,717297 0.0000000 15.25704 25.60399 3.000000 26.94186 18.12068 4.000000 29.48827 22.71738 5.000000 25.09804 21.93784 1.000000 31.02271 24.40390 3,000000 18.07881 14.51370 1,000000 10.52055 15.25085 2.000000 10.16422 16.81578 3.000000 13.20241 27.56802 3.000000 17.06850 18,55147 3,000000 12,89832 79,18420 4.000000 25.86633 65.22403 3,000000 29.50937 49.37701 3,000000 14,81188 73.47945 3.000000 57.90549 56,66019 1.000000 87.80869 149.2523 12,o6257 748.4810 lO$,4731 23.89813 725.6929 206,9627 26,31790 708.4250 204.9841 22.15419 707.9990 202.2389 27.78238 710.8381 247.2030 15.57813 700.4202 304,6270 8.608461 718,5764 297.2244 8,282726 701,8428 244.7890 11.06824 671.5173 282,2100 14,63979 684.7668 246,8093 10.78860 688.0164 258.7771 22,88004 667,4014 190.9838 26,33801 673.2659 277,0867 12.55142 657.1216 109.6584 54.21176 653.4844 132,0939 85.32784 149.2523 16.17630 201.0084 -60.81213 195.8504 -56.07091 205.6064 -59.59244 214.4695 -58.96414 252.0904 -65.39140 322.2024 -56.68579 347.7234 -66.43114 270.3127 -70.88721 263,3945 -66.06760 292.6067 -70.24944 214.4862 -62.21118 195.9354 -66.03706 270.5830 -65.72597 134.3289 -68.57410 125,6245 41,82368 17.99821 59.85730 21,99780 66.48656 22.99770 74,69965 22.99770 61.41147 22. 99770 107.10.27 22,99770 156,6291 22.99770 138.6417 23.43961 98.07706 23.99171 144.2788 23.46480 114.3156 23,13670 106,1498 23,10690 49,79776 23.87102 126.7642 23,76772 20,75179 23.99762 21,95581 STARTING TAPE DEPTH FILE TRAILER **** 9201 .00 ENDING TAPE DEPTH = 8417.00 FILE # 3 PASS 3.003 **** FILE HEADER **** 1024-.,. . FO ON RMAT RECORD (TYPE# E DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CURVES : NAME CODE I GR 68 2 TTEN 68 3 TEN 68 4 SPD 68 5 CCL1 68 6 CCL 68 7 SSN 68 8 CSSN 68 9 LSN 68 10 CLSN 68 11 CN 68 12 CNC 68 SAMP 1 1 1 1 1 1 1 1 1 1 1 1 64) LE# UNIT API LB LB F/MM VOLT VOLT CTS CTS CTS CTS PCT PCT BYTES 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH CCL1 CLSN 9201.000 2.000000 8.324419 9151.000 3.000000 11.37498 9101 .000 3.000000 14.t4614 9051.000 2.000000 16.53616 9001.000 3.000000 16.50890 (TYPE# O) GR CCL CN 37.27301 2.000000 15.25704 24.23686 3.000000 33.73618 16.53735 3.000000 27.99222 18.89021 2.000000 24.72736 18.74181 3.000000 25.78702 994 BYTES * TTEN SSN CNC 658.7341 151.5626 12.96257 686.7954 197.5322 30.38376 688.0459 209.1717 24.89468 685.6428 226.1573 21.80441 657.9351 201.8654 22.80505 TEN CSSN 155.5345 151.5626 -11 .70712 183.5877 -50.26401 195.9339 -53.16058 209.1021 -57.32141 213.3260 SPD LSN 17.99821 39.51337 21 .96800 60.76743 21 .99780 65.29433 2t .99780 88.17613 21.99780 62.11836 1. 000000 I. 000000 26.65327 15.94631 262.0669 13.59998 8901.000 16.39455 693.9104 3.000000 3.000000 327.1484 42.05052 10.67818 8.752632 8851.000 17.36420 690.1624 4.000000 4.000000 280.3528 43.14684 10.50569 8.594873 8801.000 16.76451 695. 2283 3.000000 3.000000 255.1 285 32.81 21 8 1 2. 97642 10. 86040 8751.000 25.94089 677.2783 4.000000 4.000000 291.9705 30.19633 14.67899 12.42875 8701.000 23.10318 673.1560 3.000000 3.000000 261.5879 34.38049 12.39861 10.32947 $651. 000 79. 27669 664.1 243 4 . 000000 4. 000000 274. 3733 1 7. 22023 26. 23790 23. 23151 8601.000 64.15024 669.5056 3.000000 3.000000 191.4805 12.87384 32.93140 29.61067 252.9926 -59.97824 324.3684 -57.43365 331.0417 -58.95009 277.8950 -60.44855 272.4138 -70.76640 285.9866 -69.92645 225.7793 -62.72540 201.9430 113.7838 21.99780 165.2485 21 .Q9750 124.5227 22.38010 108.8467 22.67770 146.5138 22.30121 125.6682 22.43970 115.9398 22.99181 50. 57791 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 68 9201.00 ENDING TAPE DEPTH = 8561.00 **** TAPE LIS 88/10/20 3569 01 TRAILER **** TOTAL RECORDS IN THIS LOGICAL TAPE : 248 **** REEL LIS 88/10/20 ATLAS 01 TRAILER **** TOTAL RECORDS IN THIS TOTAL RECORDS IN THIS LOGICAL REEL : 249 PHYSICAL REEL: 249 End of execution: Fri 11 NOV 88 10:07a Elapsed execution time = I minute , 39.0 seconds. SYSTEM RETURN C00E = 0 LIBRARY TAPE CURVE SPECIFICATIONS Company SOHIO ALASKA PETROLEUM COMPANY Well C-21 Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 7-25-82 Curve Name (Abbrev.) 'Standard Curve Name Logs Used Scale GR Gamma Ray Gamma Ray 30-70, 70-110 AC Acoustic BHC/AL 150-50 GR Gamma Ray " 0-100, 100-200 SP Spontaneous Potential " " " CN Compensated Neutron CD/CN 60 - 0 DENP Density PorositY " " CAL Caliper " 6-16 DEN Dens i ty CD / GR 2- 3 CORR Correction " -. 5 - .5 RFOC Resistivity Focused DIFL .2 - 2000 RILM " Medium " " RILD " Deep " " ,,, 0C7' a 198', Anchu~§~ '" SON-iO,-,-.A-E-AS KA.-,-~PETR-O-EE UR-'-~C-O-; .............. 1-q:--CURVES ...... SP ................... S'STq ............ LSN F'R'O'R ................. 7'3'25'";'00'-'T 0 ............... 92'95'";'0'0 ..................................... 'G2'"; ........... PAGE SOHIO ALASKA PETROLEUM CO. 0.0 0.0 .0 0.0 .O O. 0,0 0.0 , 0 Oo 0o0 0.0 "~'"D 0 0.0 0.0 ,0 0.0 0.0 0.0 0.0 .0 0.0 PAGE SOHIO ALASKA PETROLEUP CO. "--D'ATE"-~'LOG'GED: ...... 7725Z62,: ............ DAT'E-'C0t~IPUTED; ....... 92'"2'I7"82 ..................... FT ........................ ........................ 7'37'8'*; .................. ......................................... 738'0'; .......................... .0 0o o0 0. SOHIO ALASKA ....................... ?'~"2-'~"; .................. ..................................... i"~"29~; .................. 55 7 0.0 0.0 · 0 O, 0 0,0 ,0 O. PAGE .0 O. 7 .0 O, 0.0 0.0 0o0 0.0 ; 0.0 .0 .0 Oo 0.0 0.0 o0 O. PAGE 5 SOHIO ALASKA PETROLEUm; CO. O'ATE---[JOGGED'-: ........ T~5"Z'82 ................. DATE- .................................... 752"9'"; ....................... 72-;'7 ...................... ...................................... '7'5'~"0'; ................... 6"9"'; 9 ......................... ~-';'0' .......................... O"';'D .0 0.0 0.0 0,0 .0 ,0 O, 0,0 0.0 O. PAGE 6 SOHIO ALASKA PETROLEUM CO, '¥""-O'-~TE--'-LOGG'L-D-'; ...... ?-~25/~2 ................. 1D-ATE"--COPIP'UTEU-,~ ...... 9'Z2-~'7--8-~ ....................................................................................................................................... ........................ 'KT .................... APT .................... MV .................... IN ........................ 'G'?"C- ................... ~' ..................................... ~ ............................ '/57'9';- .............. 98-';-7: ................... -"O";-O ....................... 0';0 .................... :"'0~"0 .................... 0'2"0 ..................... 02-0 ..... .......................................... ?'580"; ................. 1"0"0";-5 ........................... O-lO .............................. 0"2--0 ............................. 0'-~-0 ................................ '0'~ ,0 0. .0 ,0 0.0 0,0 0,, O t · PAG~ SOHIO ALASKA PETROLEUM CO. ......... O"'-S-~ ......... C~"2--i .......... D-~TE'-' I~'O'GGtSDI ..... TT'2§Z"B2 ............... D~T'E-'"'¢'O'~lPOTED':'--9'Z-2-~78-~- ..................................................................................................................................................... .................. D~'P'TH ......................... GR ................ -SP ............... 'C'-A'~- ................ 0'~ ~l .............. F~-E-F~ P ................... '~-~ ........................ -~' ................ -RFOC .............. ~'-i"[~- ............. -R"i-[~- ..... ..................... ~T ................................. -~'PI ............................... '~f'~' .................. I~I .............................. ~"7'C ....................... ~ ................................ ~ ..................... T'6"2'8", ......... ~ 2'5';-~' .................... 0"; '0 .............. 0"~ "0 0';' O' ............ 0 ~ '0 0"~'"0' 0"~'-0 ..................... 0"'~'-0 ........................... 0"'~"'0- .......................... '0-~-"0' ....... .0 .0 0.0 0.0 0.0 0.0 O. 7~ · 0.0 0.0 0.0 O. 0,0 0.0 O. .0 .0 O. 0.0 O. .0 .0 O, 0,0 0.0 0.0 .0 O. 0,0 0.0 0.0 O, 0,0 ~ O. 0.0 0.0 0.0 0.0 0.0 0.0 PAGE 8 SOHIO ALASKA PETROLEUD'I CO. O¥S; ..... OATK ~ ........... 1.:OGGr_ O · ................... DEPTH .......................... GR ........................ F-T ...................... ...................... ::"76'7'B'"2 ........................................... 7'~'8o'"; ................................ 76'82; ....................... :~:'-9:0'-;'G :-:": ........................ 0'¥0''~: ........................ 0'; PAGE SOHIO ALASKA PETROLEUa~ CO, --- D-';'~";-'-~C-~'-2~ .......... D'AT~--"E'OGGED~-7/25782 .............. DATE-- 7 ,0 0,0 7 ,0 O, 0,0 0,0 0o0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 .0 .0 O, .0 0.0 ~ PAGE SOHIO ALASKA PETROLEUM CO. ........ O-'~'S; ..... 0.0 ,0 O, I m~ 0.0 0.0 0.0 0.0 0 .~< ~sion 0.0 0.0 '7 0. PAGE 11 SOHIO ALASKA PETROLEUM CO. ........ O-ATE-E-OGGED'-: ........ 77-257'82 ............. OA'TE'-"-C ~P~OTE~'~"-~72-i-Z~2 o0 0.0 O. 0.0 O. O. .0 O. O. PAGE SOHIO ALASKA PETROLEUM CO. " ....... D'~TE"-Ig'0'G-GED': ....... 7'72'5782 ............. -DATE- ........................... ~-T ................................ ~PI .......................... R~' ....................... I'"~ ............................. ~"?"C .................. ,0 O. .0 O. PAGE SOHIO ALASKA PETROLEUM CO, ...... ......... D-A'TE'- 12OGGED:--72~2578 2 ............ DA'TE-C0~DUTED-f, '--9-72-f ?-8-2 ................. DK-PTH ................... GR ............... %P .............. C-A-E .................. DEN ............ DENP .......................................... 7"~3"0'-;- .......................... §'8';"~- .......................... DTD' ............................ 0' ;-0 .............................. D-°-'O ........................... iD' .0 0.0 .0 o0 Oo 0o0 0o0 o0 o0 Oo 0o0 O ~ 0,0 O, O. 0.0 O. O,O O. PAGE 14 SOHIO ALASKA PETROLEU;"i CO. ......... DATE "LOGGED: ....... 772-5'782 ......................... 79'T8-; ...................... S"8"';"~' ............................ 0'";"0 PAGE 15 SOHIO ALASKA PETROLEUM CO. ...... ....... O"ATE'-'-I2OG'GED: ?'/25'ZB2 ............ D-ATE' .................... D-EPT H .................. GR" .................. $ P ............... C ~' L .......... i~-E'~I' ............ 'D E~i"-P' ................... C tq ................... A'-C' ............ i~"F-0'~ .............. '~"~ -i"i~' ........... ~'-~-L'D- ........... ........................ 'PT ...................... -API .............................. l~l'V- ................... II~' .......................... ~-?-~' ..................... ..................... ~-'02'~-'~ .................. 5'8' '~ i ............... 0 '~"'0 ................ 0"~ '0 .................... ~'"~--0'0"~' ~ .................. ~'-, "0-'0-~" 0 ...................... ~"'~ '0 O' '~'b .......................... ~'--~-6 ...... 8 .0 0.0 0,0 0.0 0,0 0.0 0,0 0,0 0.0 0,0 0.0 .0 Oo 0.0 0o0 0.0 0o0 0°0 0.0 O° 0.0 0.0 .0 O. 0.0 0.0 .0 0.0 ~ O. .0 .0 O. 0.0 .0 .0 OI .0 0o0 o0 O. 0.0 0.0 0.0 0.0 0°0 0.0 PAGE SOHIO ALASKA PETROLEUm~ CO. D"'-S';-C;"21[ ............ DATE"-l;.OGG'ED-:---'?'725/'8'2 .......... -D-ATE-" ................. D' ,F_PTH ....................... GR ...................... SP ................. C-AE ................... FT ............................... AP~ ................................ MV ..................... 'IN ............................. 80'7":,3-', .................... '50'-;"8 ...................... 0'";'D ...................... 0 ,' ...................................... -8"079"'; ................... 5-5-;'3' .......................... 0-';'O ....................... O ..................................... 808'0-; .......................... 5'8';"0 ........................... 0';'"0 ............................. 0 0o PAGE 17 SOHIO ALASKA PETROLEUFi CO, ........... DATE'--'L 0 GGED":-"-7725 782 D'A T'E--'--C"O M'P OTE'D'"~ ................. O'~"PT'~ 'G'R ............. SP ............... 'C'AL .................... 0-~-~ ~'E'~-P ................. ~'-N .................... A"~' ............. '~'P-O-~' .............. '~-'j'-~-~ ................. ~--~-L-'6' ............ ..................................................................................................................................................................................................................... ~'~ ~'"~"2'~ ", .................. ~"2";5 ....................... 0";"0 0'";'"~ 6";"0 0"; "6 O' ;'0 0";"0 ......................... 0'-';"'0' ........................... 0','"0 ......................... -0-':""0- ....... ':": ............................ '~':'~'2-~';"-'"'~'";':":-:~-~';:'8'~-:'~ ................. 0':;":0-: 0";:'0 ......................... 0":';':'0":' ........ : ....... 0'-;':'-0 0':~;'"'~: ................. ::'0:';'-'~- ......................... ~"-;':'-~'~-: ............ ~'"~-';-0--: ......... '0-~0 ....... .......................................... '~-~"3"0'-; ..................... W"~-';'-5 0';-0 .................................. 8 'q. O. 0,0 0.0 0,3 0o0 0,0 0.0 0o0 8 0.0 0.0 ,0 O. 0.0 0.0 .0 ,0 0.0 o PAGE 18 SOHIO ALASKA PETROLEUM CO. ...................... FT .......................... ~PI ............................ MV .......................... I'N ................................ G'?-C ......................... ~ ~': O, .0 ,0 .0 O, O, .0 ,0 O, 1 0.0 0.0 .0 O. 0.0 0.0 0.0 O. ~ .0 .0 O. PAGE 19 SOHIO ALASKA PETROLEU~i CO. ........................D;,~TE I20GGED.' ..................................................... 7/'25782 DATE COMPUTED~. ............. 9721/82= ........... F ............................... 82'2"8'"; ..................... $'?'"; "~ ...................... 0 -,"0 ....................... 0";'"'0 ........................ -0"';' 0 ...................... 0-;"'0 ...... ............................... '8'22"9'; ...................... ~15';-0 ............................ 0';'0 ......................... 0"; 0 ......................... '0"; 0 .......................... 0"-; 0 ........................... .......................................... 8"2'S"0"; ........................... 6"~"; "2 ............................. 0-;' 0 ......................... 0";'-0 ........................... 0","0 .............. 0-','-0 O · .0 O. 0.0 0.0 ,0 O. PAGE 20 SOHIO ALASKA PETROLEU~ CO, O';S, ......... OAT-~'---EO G GED-": ........ 7Z25"Z82 ............... D'A TE-'C'OR P'OT~D"t 0. PAGE 21 SOHIO ALASKA PETROLEU~i CO, O-ATE'-'-EOGGED': ..... 77'~5782 ............ ...................... O'E'P'TH .................... G'R ......................... S'P .................. C'A[ ................. DE~'~ .................. DEiqP ................... C'N ................ -A-C- .................. R'FO-C ................... '~' ~"~ .............. R IL"~ ....................... 'K-T ............................... A'P'~' ........................... ~ ..................... I~ ....................... G-?-C ..................... ~ ............................. ............................... ~'32'9"; ........................ 76";'"7 ....................... 0"~"0 .................... 0"; 0 ....................... 0-';' 0 .................... 0";--0 ............................ 0-';"0- ...................... 0-';--0 .......................... 0'-~0' ................. '0~-0 .................... ~-~-0 0.0 0.0 0,0 0.0 '0'"'~'"'0 0 . 0 . 0 , 0 , 0 0 , 6 O, O, 0,0 0o0 0.0 0,0 ,0 I .0 0.0 l, 0,0 0.0 0.0 0.0 0.0 0o0 0,0 0.0 I PAGE 22 SOHIO ALASKA PETROLEUM CO. ...... D;S-~ C~21 D'ATI~'"'IOGGED'-: ........ 7725 7;82 ............... DATE' 'C0 MP UT'ED: .................... DE'PT~t ......................... GR .......................... SM .............. CA'[ .................. DEN .............. D'ENP ................. C'N A-'C' ........... 'R-FOC .................. ~'-i"E'M- ................. R-I'['-~' ....... .............. 'FT .............................. -A PI ............................... M~/ ......................... IM ............................ G'?"C- ................... ) ................................ o";' '0~;0 o. I PAGE 23 8 0.0 0.0 0.0 .0 8 O. .0 .0 .0 O. 0.0 0.0 O. 0,0 0.0 O, 0.0 0.0 ~ O. O. .0 0.0 O, 0.0 0.0 0000.0 2. O, 0000.0 2.4 I0000 2. PAGE SOHIO ALASKA PETROLEUM CO. "---D-ATE-':'~OGGE'D"t ....... ~-725762 .......: ....... D'A'~-'"'-CO'RPU~ ...... 9'72 ................. OEPT~ ........................... GR ..................... SP ............... C'AE .................. DE'F; DENP- 8 1 1 ~ 1.5 ol 1 1, 1.~ 1.4 .5 1.4 1.5 1.4 PAGE ~5 SOHIO ALASKA PETROLEUi"i CO. ........... O-';-~-'~ ...... ........ DT~T'~'--"~O'G6EUr-'-'?'/25Z'8'~ ............. D'~-T£---~-ORPOTEU~- --9'Z~-~-~-~-~ ................................................................................................................................. ............ O-~-PT'i:~ .................... ~R .......................... SP .................. 'C'A'i'-' ..................... 0-'~-'~ ............... O1EN'P- ........................ C'~- ................... A"~- .......... -P,-~'O'~ ............... ~'"~'K~ ............ -~-~L-~ ....... .................. P'T ........................... A'PI ........................... M-V ...................... IN ........................ ~7'~ ................ % ................................ 2.4 ~7.4 4.5 112.8 1.8 ,5 1 :.8 1.6 1.5 1.6 1.5 1.8 1.6 .8 15.0 19.~ .o 16.4 .4 PAGE 26 SOHIO ALASKA PETROLEU~I CO, ............ UATE'-T~UGGED'-: ........ 77~'7'82 ............. DA'TE"-C-0MPUTEU: ................... D"~'PT"H ....................... GR ...................... SP ................. C' ~"E .................. DE N ................. DEMP CN- ..................... 'A 'C- ............ ~'F0-C ............... ~-'i i--"M- .............. ~'-i-ED- ....... ........................ P-T ........................... ~'P! ............................. t~'V ........................ IN ............................. G-?-C .................... ~ ................................. .......................... ~'578-'~ ............ 22'6"~'-6' ............. '~-8-"0 "~" '6 ................... 9'"~'"3 2"~ '5 .............. I"1"~' 6 I7' ~'"0 .................... 89"~"~ .................. I'~'-'~' "0 .............. .~ 26, 26.6 28.6 8 2. .? 0.6 8 2, ,8 18.~ 18.0 31.1 16.1 20.0 15.2 1~.5 .8 33.9 30.2 .5 111.4 .2 PAGE 27 SOHIO ALASKA PETROLEUM CO, ......... DA-TE '*"LO GGED': ....... 772'5/82 ........ : ........ DATE--'--C'-OMPOT'ED-F:----"-'N ............................ ~-'G28"; ............... I~'4'";"3 ............... ;50';"~ ................... 9;7 2-;-7 2";'4 ............. I0";"4- ................ GO"';O ....... 2I'8";"3 ...................... 9'9';3 ..................... 8 ;'6 .9 Z89.9 120.0 2. .0 ,~ 250.9 8 .1 197.~ 2' .6 .6 8.8 .7 .9 25. 6,8 6.6 ~.1 2.6 2 2. *.* 2.9 5.3 ~.9 ,0 · 6 .~ 3.8 PAGE 28 SOHIO ALASKA PETROLEU~i CO. ......... D-;S; .... C -- ..................... DAT£ LOGGED,' 7725/82 DATE COnPU~. S680. ~8.8 -GS.I 5.B z.3~' 25.0 I~.7 93.5 S~.8 26.1 31.7 2. .5 13.~ 16.1 10.5 LI.O .~. ';'"'~ ....................................... 5"'; 81.8 205.1 1~+6. 60. PAGE SOHIO ALASKA PETROLEUP! CO, ........ D.-S-, ....... CIATE--' LOGG'ED:---'-?7257'8'2 ................ D AT E' "CO'MPUTED-.~-' '"9'/2-i'/8'2 .............................................................................................................................................. .................... 13'£'P'TI:i ....................... GR' ...................... SP ........... C'A'L ........... OE'i~i ....... OE'NP ..................... 'C-i~;i- ........................ A'~ ............. 'i~'FO-C ............... ~.~'"~'-i~'M ........... -R-[i"i--h- ........... .......................... pT .................... -A'PI ...................... -M'V .................. IN' ......................... ....................... 'i3-72'8"; .................... $'I"';"7 ............ ~'5"0 8 ~. .~ .3 83, 73°0 148.0 2.2 °3 82, 7~.4 161.2 67.0 u~8.! 80.6 8 2. .~ MI 61.~ 106.1 37.5 61.8 .............. ~'~"~'"9 ................ 51, ~.1 ~7.8 PAGE 30 SOHIO ALASKA PETROLEUM CO, : ........ DA-TE"'"'LOGGED': ....... 7725Z82 .............. DATE""-CO'MPUTED"',' ...... 9'/21"?-'~-2 .................... DE-PTF4 ........................ GR ........................ SP ............... C All ................ DEN ...... O E~p C'iq .................. F'T- .......................... AP-I- ............. -MV ............ ; ............. IN ............. ; ............... GTC ......................... q7, 8 .1 2,~ ,0 2, 2,5 .5 66. 8 8. 2. .2 .6 3.2 .7 8~.2 59,7 8~.0 66,8 ~.5 6~.3 ?.~ 62,~ · 1 59.5 79.~ PAGE 31 SOHIO ALASKA PETROLEUM CO. 07~"~-'L'OG'~'T'--TZ25'TB'2-: ............. DA'TE"--C"0MPOT~'~'~---~"7'2'i'7-~'2 2. ,5.~ 41. 2.4 ,8.7 1.9 .1 41.5 32.1 4~.9 77.7 74.9 B2.0 165.0 .0 2. .8 .4 1_ .5 143, 110.9 485.0 PAGE 32 SOHIO ALASKA PETROLEUM CO. .....................DATE LOGGED.= ' ........................................... '7/25/'82 DATE 60MPUTEO,' ............................................................................................................................................................. 97217~2 ~ ......... 90. 17.6 57.0 tl.8 ,7 8 .6 ~6, 55,5 82.2 70.5 ,8 PAGE 33 SOHIO ALASKA PETROLEUM CO, 2. .7 2 ~.0 2. .9 .6 .6 21.0 3q,.6 9.5 !3.3 .q- 6.6 .D .6 20. .6 .5 0.9 PAGE SOHIO ALASKA PETROLEUP; CO. '--'DA;TE'-L-DG GED':--TZ2:52' 82 ............... DATE-"COM PUTED": ...................... D~-P'TH ......................... GR ........................ SP ................... C-Al .................... DEN ......... O ...................... FT ................. --API .................... RV ...................... IN ....................... '-G?"C' ........................ 9 11.2 15.9 PAGE 35 SOHIO ALASKA PETROLEU~'i CO. ........ D','S-; ..... ........ DA'TE-'-IZ"OGGED:--7725~'82 ................ DATE-"--CO'PiPOTED',' ....... 9'Z'2'I/82 ...................... D£-PTFi ....................... G'R ........................ SD ............... 'iS ?~' [ .................... i~-E'iq ........... DEN-P ..................... CN ......................... A -C ................ '~ F'O-'~ ................. ~-~"[-~- ............... -l~'-Z-[-~ ........ ................................. 9-02'8'; ................ I8-';"9 ........... z3"~ ;"I .......................... '6'~'7 .................... '~";-'~- ................ ~5"'~'-~ ..................... 20 ;3' ................... 9'i';'i ................... i"S"~'5 ....................... ~"~"'~'"-~ ............... ~'~'"~--~ ......... ................................. '~'0-2'9-: ................... ~"~ ;"~: .......... '~-'55';"~ ......................... 8';'7 ........................... ~";"2 .................. 2'~-;-'~ .................... I7"~'9 .................... 90"'~'"~' ..................... %'g';-~- ............ ~"g~-5- ........... ................................... ~"0'~"0"~ .......................... ~'7';"~ ............. z'~"8';'O ................... a"';'"'7 .......................... '~-':' S ............... 2'6'-;'-? ...................... I'5";"9 ......................... ~"O"T'i ......................... ~"0'-";'-0 ......................... ~"5'~"~- ...................... -~"6-':~ .......... 8. 2.5 0.3 LS.~ 79.2 1~.3 8.9 2.6 ~.3 21.2 73.~ 8.9 8.8 10.6 8.0 7.~ 5,6 6.~ .1 9~ 2. .6 .1 9, 9 2. .7 8' 10, ,9 9.5 12.1 10,5 12.5 10, LS.0 9,~ 11.8 8,9 0.6 PAGE SOHIO ALASKA PETROLEUM CO. D-';"S'; C.;2I DA'TE-'LO'GGED'": ....... 77'25762 ............. DA'T'E'--CORP'UTED: ...... 92'-2-I'Z8'2 ................................................................ : ....................................................................................................... ;; ................................... ; ..................................... : ............................................................................... : ............................ :': .::-7'"¥:- ':?-~-'=:':---:= --"-:;-:¥'.=- 9 .5 .0 .:3 .0 8. 0.6 9.~ 11.2 6.6 Y.8 .6 9. 8.0 9.5 · 7 8. 7.8 9.8 PAGE 37 SOHIO ALASKA PETROLEUM CO, D;S, 'C-2~ UATE --'-EJOGG-ED': ...... 7725782 ........... D'AT E --C-OMPOTEEF:-"'~-~'2"2--i'?'82 ................................ 'K-T API ..................... H'9 ................... I-N G-/~ ~ ,o~ 2. .W .5 .7 13. 9 o6 8. 2. .8 :0.2 16.~ 20.1 .5 ~6.2 .2 9 .o .5 .0 7. 7.0 7.G 6.7 7.3 PAGE 38 SOHIO ALASKA PETROLEU?i CO, O". S', ...... C-2-I ............... D'AT E"" 'L OGGEU: ...... ?'Z25 / '82 ............... D'A TE-' COMP UTEO: ......................... D-E'P'T'R ......................... GR ...................... SP .............. CAE ..........O E',.'q ..... DEMP ........................... F'T ................................ AP'! ........................... RV .................. IF~ ..................... G?C ..................................... 9"I"8U; ................. '~2.-"; 2' .............. ~"7"I'g"6 .................... 9 , ~ .............. .o ,1 9,6 9. 7.9 10.0 9.~ 6.1 5.5 9 .~: .0 3. 3.2 · 1 2. PAGE 39 SOHIO ALi~SKA PETROLEU?; CO. D""," S',-' C'; 2'i ........... DA TE "-'KO'BGED': ....... 7"/'2'5 / 82 ......... D'A'T'E---C ~D MP'OTED-: ....... ..................... D"E"P'T'[ i .......................... G"R .......................... SD .............. C 'A E ............ O'EN ........ G'E N-P- ............... CN .............. A C- ........... ~FOC' ................ ~"~"E"i~i .............. 'R-i-'E-15 ....................................... 923"0"; ............ I8'5-;"5 ................. ;'"7'3'-;': 7'~'(:; ..................... 2";~ ............ l'~";"O ......... I'9-;"0 ................. 83; 2 ............................... 5';9 3-';"~ ................................. -~-;-~' 9 2.4 .0 .3 8 .3 5. 3.~ 3.0 .4 · 7 8.8 8.6 .0 2. 8.0 .7 2.q. 8.0 ,,,7 6.1 8. 7.8 8.0 6.$ 5. 7. 5.5 5.2 8.7 4..7 4..7 4.6 ~.7 PAGE ~0 SOHIO ALASKA PETROLEUD;! CO. ............ D';"S-;-"~-;2'~- .............. O"A'TE'-"'~-OGGED'I ....... ?Z~5'ZB ~ ................. O ~T£'-'C ~ MP OT ED:-'--'- ...................... ~.~p.T~.~. ......................... GR SD C'A'L .................... D'~'N .......... DEN P ~'N -A--~' ............. ~-'~'O-C .................. ~-~"'L-H ............... -~'~-'C~- .......... .......................... '~-T ...................... -~P'I 'M'V I"N' ~'7'C ~ ~ ....................................................................................................................................................... ':" ............................................. 92~0~' ............................. ~"'~018: ........... ;~0~.0 ................................................................. ?,~ '~2,~ .......................................................................................................................... ~BIO ~.7 7~.~: ............ "-'-: ............ ~7t~:~ .................. T ......... ~'--517'"~;~ ............... -~ .......... ~Y :, ..................................... ~.z...~:~._~ ~..o-;:,~-,;,~-o¥.;.~-..~.:-~ ......... :?.;.~ ............. :_:.-~;.,~.~, ............. :..~.-~-~.;,o~ ~..~_.;.y, ................... y~:;-.~' .................. :..~-~,.;.y .............................. ~s,~.;,y..,~ ..................... :.,~-.:? ....... SI COMPANY NAME : BP EXPLORATION ~ELL NAME : C~2! (32-19w11-14) FIELD NAM~i : P~UDMOE BAY ' BOROUG~ : NORTH SLOPE STATE : ALASKA API NUMBER : 5'0-029-20753 REFERENCE NO ~ 73868 LIS TaLe Verification [,lstinq Schlumberger Alaska Computinq Center 26-NAY-1990 11:19 **** REEL MEADER DATE : 90/05/26 ORIGIN : FbIC R~EL NAME : 73868 CONTINUATION ~ : PREVIOUS REEL COMMENT : BP, PRUDHUE BAY, C-21 (32-19-11-14), API ~50-029-2075~ **** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 90/05126 ORIGIN : FLIC TAPE NAME : 73~6~ CONTINUATION ~ PREVIOUS TAPE COMMENT : BP, PRUDHOE BAY, C-21 (32-19-11-t4), API ~50-029-20753 **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 00lA04 DATE : 90/05/~6 MAX R~C SIZE : 1024 FILE TYPE : LAST WIL~ ******************************************************************************* ******************************************************************************* ** ** ** SCHLUMBERGE~ ~Ehb SERVICES ** ** ** ******************************************************************************* ******************************************************************************* COMPANY ~A~E: BP EXPLORATION wFLL~ C-21 (32-19-11-14) FIELD: PRUDHOE SAY BORUtJGM: NORTH SLOPE 6TATE: ALASKA APl NI.}MBEP: 50-029-20753 LOCATION: 884' SNL & 1523' WEb SECTION: 19 TLJWNSMIP: llN RANGE: 14E PERMANENT DATUM: ~SL ~LEVATION: 0 'bis TaDe Ver.i. flcation Listinq $cblumberoer Alas~[a Computlr~o Center 26-MAY-1990 I~:19 LOG MEASURED FRO~.~ KB 67.5 ABOVE ELEVATIONS KB: 67.5 DF: 66.5 Gt,: 37.6 DATE LOGGED: 15-~AY-1990 RUN NU~iBER: 1 TD DRILLE~: q094 TD LOGGER: 9192 CASING 1: CASING 2: TUBING: 9 5/8" 47 L}~ ~ ORILbER DEPTH OF 0 TO 8484 7" 26 LB .~ DRILLER DEPT}~ OF 7967 TO 9280 5 1/2" ~7 LB (a DRILLER DEPT~ OF 0 TO 8049 BIT SIZE 1: 12 1/4" BIT SIZE 2: a 112" TYPE FLUID I~ ~OLE: D!ES~L/PRODUCED WATER TIME LOGGER [~N BOTTO~: 10:00 15-MAY LOGGING DISTNICT: 4615 LOGGING E~GI~EE~: JOMNSON WITNESS: ~HITLOW TOOL NUMBERS: CNC-DA-IO1 CAb-UB-299 ATC-CB-1152 AT~-AA-374 F~ELD RE~A~KS: TIED INTO DA SONIC DATED 7/25/82 ~ELL }~AD BEEN SHUT IN DUE TO H~GM GOR PU~PED ~30 BBL$ PRODUCED WATER + 50 BBLS DIESEL PRIOR TI) L[]GGING aa;~ 2,5" TOOL O~ LIMESTONE MATRIX DATE JOB STARTED: 26-MAY-90 jOB REFEREPCE MO: 73868 LDP/ANA: KO~4RI~G ****************************************************************************** FILE - ~:DIT,00I BP EXPbORATIO~ PRI.IDHOE gay C-21 (32-19-11-!4) 50-02g-20753 DATA ,q~.PI, ED EYE[~Y -,5000 FEET LIS Ta~e Verification Ltstlnq Schlumberqer AlasKa Computinq Center 26-MA¥-1990 !1:19 DATA INC.b~IDED- TOOI, EXTENSION TOOL TYPE USED NAME .~LA HOOGES-b~YNANN AVERAGED NPHI CNT-A/D/H .PS1 COMPENSATED NEUTRON CNT-A/O/H .PS2 COMPENSATED NEUTRON CNT-A/O/H .PS3 COMPENSATED NEUTRON CNT-A/D/H ,PS4 COMPENSATED N~UTRON 9189' TO 849~' 9189' TO 8494' 9189' TO 849~' 9189' TO 8490' 9~89' TO 8493' PAGE: 3 TABLE TYPE : CONS VALU . E~ I CN ~P EXPLORATION FN PRUDHOE BAY WN C-21 (32-19-t1-14) APIN 50-029-20753 FL 884' SNL & 1523' WEb SECT 1.9 TOwN llb RAN~ 14E STAT ALASKA NATI USA WTTN WHITLOW SON 350059 PDAT MSL EPD FT L~F' KB APD FT 67,5 EKB FT 67.5 EOF FT 66,5 EGL FT 37 6 TDD FI 90~4. BLI FT 9189, TLI FT Company Name Field Name Well Name APl Serial Number Field Location Sectio~ Township Range County Sta~eNat on or Province Witness' Name Service Order Number Permament datum Log ~easured From Bottom Log Interval Top hog Interval 8500 TL.AR 10:0 i5-}~AY Time Logger At Bottom TABLE TYPE : CURV D~PT Depth Cha~el Name NPH! Neutron Porosity NP~I Neutron Porosity TNR~ Calibrated :thermal Neutron Ratio LIS Tare verification L~.sting Schlumberger Alaska Computing Center 26-~AY-199o 11:19 DEFI {~CN~' RCNT RCFT RCFT C~TC CNTC CFTC CFTC GR Gamma TENS Tension CCL CC[, AmPlitude NPH! Neutron Porosity TNRA Calibrated Thermal {geutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC C~ Gamma Rav TENS Tenslo~ CCL CCL Amplitude NPM! Neutron Porosity T~R~ Calibrated ~hermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR Gamma T~NS Tension CCL CCL Amplitude NPH] Neutron Porosity TNR~ Calibrated Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC G~ Gamma ~a¥ TFNS Tension PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64CB ** TYPE REPR CODE VAbUE i 66 0 2 66 0 ] 73 152 4 66 5 66 6 73 7 65 ~ 6~ 0,5 LiS Tape Verlficatlon Listing Schlumh. erqer Alaska Computlsc7 Center' 26-~AY-1990 !1:19 Il 66 6 13 66 0 14 65 FT 15 66 68 16 65 0 66 0 ** SET TYPE - CHAN ** NAME SE ~ T ERVICE bPI AP1 PI I lb NUMB NtJ~8 SI EP ROCE$S ID ORDER # bOG TYPE CbA$$ .OD NUMB SAMP Eb£M CODM (HEX) _ ..... o ..... oo'""ooo .... .... NPH! HLA P!l 350059 O0 000 O0 0 I I 1 4 68 0000000000 NPHI P$1 PU 350059 42 890 O0 0 TN~A PS1 ]50059 42 420 O1 0 RCNT PS1 CPS 350059 42 420 Ol 0 RCFT PSI CPS 350059 42 420 O1 0 CNTC PS1 CPS 350059 42 420 O1 0 CFTC PS1 CPS 350059 42 420 O1 0 GR PS1 GAPI )50059 42 310 O1 0 TENS PS1 LB 350059 42 635 21 0 CCL PS1 V 350059 42 ]50 01 0 NPHT P$2 PU 350059 42 890 O0 0 TNRA PS2 350059 42 420 RCNT PS2 CPS 350059 42 420 0t 0 RCFT PS2 CPS 350059 42 420 Ol 0 CNTC PS2 CPS 350059 42 420 O1 0 CPTC PS2 CPS 350059 42 420 O! 0 GP P$2 GAPI 350059 42 310 O1 0 TENS P$2 LB 350059 42 635 21 O CCL PS2 ¥ 350059 42 ~50 O1 0 NPHI PS3 pl.) 350059 42 8qO O0 0 TMR~ PS3 350059 42 420 Ol 0 RCNT PS3 CPS 350059 42 420 O1 0 RCFT PS3 CPS 350059 42 420 Ol 0 CNTC P$3 CPS 350059 42 420 Ol 0 CFTC PS3 CPS 350059 42 420 O! 0 GR P$3 GAPI 350059 42 3t0 O1 0 TENS PS3 bB 350059 42 635 21 0 CCh PS3 V 350059 42 150 Ol 0 NPHI P$4 PU 350059 42 890 O0 0 TNRA PS4 35~059 42 420 O! 0 RCN~ PS4 CPS 350059 42 420 01 0 RCFT PS4 CPS 350059 42 420 O1 0 CNTC PS4 CPS 350059 42 420 01 0 CFTC PS4 CPS 350059 42 420 O1 0 G~ PS4 GAPI 350059 42 310 Ol 0 TENS PS4 LB 350059 42 635 21 O t I t 4 68 I I ! 4 68 1 1 I 4 68 I 1 i 4 68 1 1, 1 4 68 1 1 I 4 68 i ! 1 4 68 1 t 1 4 6~ I 1 !, 4 6~ I 1 ! 4 69 1 1 I 4 68 i ! 1 4 68 1 1 I 4 68 i ! I 4 68 1 1 I 4 68 i I 1 4 68 I 1 I 4 68. 1 1 1 4 68 1 I I. 4 6~ I 1 I 4 68 I 1 1 4 68 1 1 1 4 68 I 1 1 4 68 t I 1 4 68 I I. 1 4 68 1 i I 4 68 I 1 1. 4 68 ! ! I 4 68 1 1 1 4 68 I I ! 4 68 i 1 I 4 68 i 1 1 4 6~ 1 1 1 4 68 i I t 4 68 ! 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 O00000OO00 0000000000 0000000000 0000000000 0000000000 O00000000O 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 PAGE: LIS Tape Yerlflcatlon Listin<l 8chlu~berqer Al. asks Computin(~ Center 26-~Y-1990 11119 DFPT. 9217.000 ?~PHI,HLR [~CNT,PS1 -999.250 RCMT,PS1 G[~', PS! -999,250 T~No. PS1 r. R~., PS~ ~99,250 RCNT,PS2 CFTC, PS2 -999,250 GR, PS2 MPHT.PS3 -999,2.50 TNRA,PS] CNTC.PS3 -999,250 CFTC,PS3 CCL.PS3 -999.~50 ~!P~I. PS4 RCFT,PS4 -999.250 C~TC,PS4 TflNS. PS 4 -99~. 250 CCh. PS4 DEPT. 9200. 000 ~,PHI, aba RCNT,PM! -999.250 RCFT.PS1 G~,PSI -999 250 TENS,PS1 T~!R~.PS2 41855 RCNT.PS~ CFTC, PS?, 622. 859 GR. PS2 NPHT,PS3 23.585 TNRA,PS3 C~iTC. PS3 3020,172 CFTC PS3 ~CFT P$4 597.250 CNTC. PS4 TENS: PS4 ~50. 000 CCL, PS4 DEPT. 9100,000 NPHI HLA RCNT.PS1 3334.669 RCFT:PSI G[~.PS1 16.531 TENS.PS1 TNRA.PS2 4,481 RCNT.PS2 CFTC, PS~ 796,960 GR. PS2 NPHI PS3 21.058 T>~RA.P$3 CNTC".PS3 3487,300 CFTC,PS3 CCL,PS3 0,000 NPHI,P$4 RCFT,PS4 770'713 CNTC.PS4 T~NS, PS4 1065,000 CCh, PS4 DEPT 9000. 000 ~-~PHI. I~LA RCNT~PS1 3265.306 RCFT.PSI GR PS1 14,797 TENS.PSI TNRAiPS~ 5.04i RC~iT.PS2 CFTC,PS2 687. 530 G~.PS2 NPHI PS3 24.750 TNRA,PS3 C~!TC iPS3 3465,929 C~TC, PS3 CCL PS3 9.000 ~q~I. PS4 RCFT PS4 ~77. 165 C~TC. PS4 TENS. PS4 1090. 000 CCL. PS4 22 -999 -999 -999 -999 -999 -999 -999 -999 -999 363 NPH!,PSI 250 CNTC,PSI 250 CCL,PSI 250 RCFT,PS2 250 TENS,PS2 ~0 RCNT,PS3 0 GR,PS3 250 TNRA,PS4 :250 CFTC,PS4 , . .250 23,975 -999.250 -999 250 2873i469 16 594 4.742 630 367 25~397 2992,296 0,000 21 833~ 1085, 3307, 15. 4 802i 21 3538 0. 25. 73~ 1080i 327O 15. 4 708i 25 3390 0. O45 667 0o0 086 664 431 374 058 6i0 000 146 694 000 541. 516 138 247 859 000 NPMI,PSI CMTC,PSI CCh,PS! RCF~,PS2 TENS.PS2 ~CNT,PS3 GP.PS3 T~RA,PS4 CFTC,PS4 NPHI.PSI CNTC,PS1 CCh,PS1 RCFT,PS2 TENS,PS2 RCNT,PS3 GR,PS3 TMRA,PS4 CFTC,PS4 NP}{I,PSI CNTC,PSI CCh,PS! RCFT,PS2 TENS,PS2 ~CNT,PS3 OR PS3 CFTC.PS4 -999 250 -999 250 -999 250 -999 250 -999 250 -999.250 -999.250 -999i250 -999 250 -999.250 -999 250 -999 250 62i 677 775 000 2944 238 21 500 4 960 i9 758 3455 587 0 000 847 784 1045 000 3426 326 15 234 4 43i 797 382 25.028 3442,390 0.000 691,552 1020,000 3363.458 14,953 4.942 684.094 TNRA,PS1 CFTC,PS1 NPHI.PS2 CNTC PS2 CCL:PS2 RCFT,PS3 TENS,PS3 RCNT.PS4 GR.P$4 TNRA.PS1 CFTC.PS1 NPHI P$2 CNTC PS2 CCh P$2 RCFT PS3 TENS PS3 RCNT P$4 GR,PS4 TNRA CFTC:PS1 NPHI,PS2 CNTC,PS2 CCh,PS2 RCFT,PS3 TENS.PS3 RCMT,PS4 GR.PS4 TNRA,PS1 CFTC,PSi NPHI PS2 CNTC:PS2 CCL.PS2 RCFT.PS3 TENS.PS3 RCNT,PS4 GR.PS4 -999,250 -999'250 -99~250 -999,250 -999'250 -999;250 -999;250 -999~250 -999;250 -999,250 -999,250 24,513 30~0,172 o.oo0 621,212 815'000 2841,,699 22,891 4 267 812 747 21 457 3465 194 0 000 818,533 1065;000 3393,939 4,9!6 709'923 26*080 3421',794 o,ooo 724,409 1040,000 3206,287 !7,188 LIS Tape Verification I, istlnq Scblumberoer AlasKa Computing Center O~PT, 8900,000 ~PHI,HLA RCNT,PD1 5061,225 RCFT,P$1 GR,PSI 8,531 TENS,PSI TNRA.PS2 2,915 RCNT,PS2 FTC,PS2 1~29.773 T~GR.P$2 . PHI,PS3 I0,384 RA,PS3 C~TC.PS3 5298,999 CFTC,PS3 CC!.,PS3 O,000 NPMI,PS4 RCFT,PS4 la54,617 CaTC,PS4 TENS,PS4 1105,000 CCL'PS4 DMPT. 8800.000 NPHI,MbA RCNT.PS1 4048.979 RCFT.PS1 GR.PS1 22.094 TENS.PS/ TNRA PS2 3.450 RC~T PS2 CFTCiPS2 1338.536 ~R[PS2 NPHI,PS3 14 751 T,qRA,PS3 · PS3 4475:260 CFTC.PS3 CNTC, CCD,PS3 0,000 NPHI PS4 RCFT.PS4 ~3!2.000 CaTC!PS4 TENS.PS4 1040,000 CCh PS4 DEPT. 8700.000 iqPHI MbA RCNT,P$1 4310.204 RCFT:P$1 G~.PS1 16.641 T~NS.PSI T~R~,P$2 3,145 RCNT,PS2 CFTC,PS2 1462,737 G~,PS2 NPHI,PS3 12,096 TNRA,PS3 CNTC PS3 4516.411 CFTC.PS3 CCLiPS3 o.000 NPHI,PS4 RCFT.PS4 1445.972 CNTC.PS4 TENS,PS4 1045.000 CCD.PS4 DFPT, 8600.000 NPHI.MLA RCNT.PS1 2833.333 RCFT.P$! G~,PS1 49,219 TENS,PS1 TNRA.PS2 5.343 RCNT,PS2 CFTC. PS2 59~, 203 (;R, PS2 NPH] .PS3 2E,]46 I~.'RA. PS3 CMTC,PS3 3i32 250 CfC PS3 CCL,PS3 0.000 olPHI. PS4 RCFT.PS4 641.2~2 CMTC.PS4 TENS.PS4 1040.000 CCD' PS4 DEPT 8500,000 NPBI.HLA RCNT:PS1 1.~3~,31l RCFT,PSI GP.PS1 42.688 TENS.PS! TNRA.P$2 O,841 RCNT,PS2 CFTC P$2 295,3~3 GR,P$2 ~PHI:PS3 54.132 TNRA,PS3 CNTC.PS3 1899.442 CFTC.PS3 CC[..PS3 0.000 NPHI,PS4 RCFT,P$4 282.90a C~TC.PS4 TENS.PS4 !040.000 CCD,PS4 26-~AY-1990 1!:19 I0 ~PHI,PSI !799 C~TC.PS1 1080 CCD.PSI 5226 RCFT,PS2 !l TEN~:P$2 3 RCN PS3 1760 GR,PS3 i0 !'NRA'PS4 5266 CFTC,PS4 0 i~ NPMI.PSI 1233 CNTC'PSI 1075 CCD'PSI 4306 RCFT,PS2 i8 TENS,PS2 3 RCNT,PS3 1280 GR,PS3 14 TNRA'PS4 4344 CFTC,PS4 0 12 1390 1.105 4424 16 1415 i2 4435 0 7 616 1!00 2938 46 5 611 25 2970 0 5O 283 1085 1827 47 7 256 52 1886 0 .352 .591 000 ,648 325 , .390 2 ,2.0 .000 .746 ,333 ,000 .483 ,141 ,612 ,206 ,798 ,178 ,000 158 ~593 000 85O 75O 247 094 437 527 o000 .197 667 000 775 875 '1874 648 854 ,000 ,732 .333 000 :655 .6~8 o74! ,727 .425 ~034 ,O00 CNTC'PS1 CCD,PS! RCFT,PS2 TENS,PS2 RCNT,PS3 GR,PS3 CFTC,PS4 NP~I,PS! CNTC,PS1 CCD,PSi ~ ' PS2 CF~. TENS'PS2 RCNT'PS3 OR'PS3 TNRA,PS4 CFTC,PS4 NPMI.PS! CNTC,P$1 CCD PSi RCFT PS2 TENS PS2 RCNT PS3 GR:.PS3 T~A'PS4 CFTC,PS4 !0,81~ 5290.32 0 OO0 1875 751 103~ 000 ~99.. 035 10.945 3,005 1775'795 i5,896 4138,554 0.000 1362,725 1050.000 4384.000 18,938 3,618 ~27~,059 1.2,45~ 4465'56 0,000 i477,406 1025.000 4447.876 16,500 3,295 !399,613 26,493 2996.816 0 000 62s:2 'o !040.0 0 3008,OOO 5!,500 4.990 628.076 50 174 19171769 0 000 304:000 ,000 i :ooo 55 219 7:58! 263.916 TM~A,P$1 CFTC.PSI NPHI.P~2 CNTC,P$2 CCh,PS2 RCFT,PS3 "E' PS3 RCNT,PS4 GR,PS4 TNRA,PSI CFTC'PS! NPMI,PS2 CNTC.PS2 CCD.PS2 RCFT,PS3 TENS'PS3 RCNT,PS4 GR,P$4 TMRA.PS! CFTC,PS1 NP~I~P$2 C~TC PS2 CCL PS2 RCFT PS3 TENS PS3 RCNT PS4 G~,PS4 '~" PSi 7~.RA, . CFTC'PSi ~PHI~PS2 CNTC,PS2 ~CL;PS2 RCFT.PS3 TENS,PS3 RCNT'PS4 GR,PS4 NRA,PS1 FTC,PSi NPMI,PS2 C TC,PS2 CCD'PS2 ReFT,PS3 TENS PS3 ..C~:PS4 GR,PS4 PAGE: 3 065 1726 457 9 767 5334 844 o o00 !811 023 105 858 513~ 000 !3,609 3,766 1i'70,058 13.559 4435,213 0 000 128~ 802 104 000 4243 6!5 t9 1.72 3,297 I409.206 tl 374 4535 290 .0 000 1445 972 1030 000 4355 2!2 14 242 5,090 604,563 28.,664 3130.476 o,o0o 657,315 i040,000 7,835 29~i.,844 7.371 272,753 44'5!3 1922,713 o'000 272,545 .10!5~000 179!:'749 · 52~938 BIS Tame Verlficatlon ListinO Schlumberger AlasKa Computlmq Center 26-MAY-~990 !1:~.9 DEPT. 8489.000 NPHI,HLA RCiqT.PS1 ~n9,250 RCFT.PS1 G~,PS1 ~99,250 TENS,PSI TNRA.PS2 -999.25(3 RCNT,PS2 CFTC.PS2. -99~, 250 GR.P$2 NPHI,PS3 -999,250 TNRA PS3 CNTC.PS3 -99q.250 C..TC.PS3 CCL.PS3 -999.250 NPHI,PS4 RCFT.PS4 -999.250 CNTC.PS4 TENS.PS4 -9gQ.250 CCh,PS4 ** END OF DATA ** 0,000 -999.~50 -999,250 '999,250 '999,250 '999,250 ~999,250 999.250 9 9,250 ~PHI,P81 C~TC'PSI CCh,. RCFT,PS2 TENS PS2 RCNT PS3 GR P83 TNRA PS4 CFTC PS4 -999.250 TNRA,P$1 999, 50 NP~I'P82 999.250 CNTC*P$~ 999 250 CCh'PS2 ~999:250 RCFT,P$3 i 999,250 TENS'PS3 999,250 RCNT,P$4 999,250 GR,E$4. '999 250 :'999 250 -999 250 '999 250 -999 250 -999 250 · -999 250 '999 250 -999 250 **** FILE TRAILER F/bE NAME I EOIT ,00! SERVICE ~ FLIC VE~8ION : 00lA04 DATE : 90/05/2b MAX REC SIZE : 1024 FIbF TYPE : bO L~S? FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 90/05/26 ORIGIN : FhlC TAPF NAME : 73868 CONTtN[;ATION ~ : PREVIOUS TAPE COMMENT : BP, P9UDHOE BAY, C-9! (32-19-11-i4), API #50-029-20753 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 90/05/26 ORIGIN : FLIC REEI, NANE : 73868 CONTINUATION ~ PREVIOUS REEL COMMENT I BP, PRUDHOE BAY, C'21 (32'19-11'14), AP1 #50-029-20753 C-21 PRUDHOE BAY r::: :'~ :~::: :: :': :::: :::::::::::::::::::::::::::::::: · :::::::::::::::::::::::::::: ::::::::::::::::::::::: ............. :::::::::::::::::::::::::::: · . ............. ::::::::::::::::::::::::: ::::::::::::::::::::::::::::: :; t:;,;;;: ~t;~::;; ::'~ :;::: ::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::: ................. :::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ================================================ .... v~ ...... ; .............. ~..%.-.%~ .............. t... .......... ~...., ................ , ......... ~.1..~...,.. ............ . ...... ~ ...... ;..~. ....... :;.::..?.,: ....... ;....:.: ..... :.::: .... Run 1: 04 - January - 1996 CNIGR Cased Hole RECEIVED r:~'p, 0 8 1~96 WESTERN ATLAS ,,,.,,,,**,,,o,,,,,. 4ragging Services ~orage 8500' 9177' Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER= OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD C- 21 500292075300 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 24-JAN-96 4352.02 K. RICHARDS S. WHIPP 19 11N 14E 884 1523 67.50 0.00 34.60 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING f ~JRVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/PT) 9.625 8484.0 47.00 7.000 9280.0 29.00 5.500 7914.0 17.00 4..500 8049.0 12.60 BASELINE DEPTH 8486.5 8507.0 8511.0 8533.5 8534.0 8534.5 8535.5 8536.5 8553.0 8554.0 8554.5 8571.0 8571.5 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH 8485.5 8506.0 8510.0 8532.0 8533.0 8533.5 8534.0 8535.0 8552.0 8552.5 8.553.0 8571.0 8571.5 PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 13-JUL-82 SWS 8573.0 8583.5 8586.0 8587.0 8595.5 8598 · 5 8602 · 0 8607.5 8621.5 8622.5 8636.0 8636.5 8637.0 8638.0 8639.0 8640.0 8642.0 8644.0 8646.5 8647.0 8651.5 8652.5 8653.0 8665.5 8666.5 8668.0 8669.0 8671.0 8675.5 8676.0 8679.5 8680.5 8684.5 8687.0 8687.5 8694.0 8698.0 8699.0 8750.5 8751.0 8752.0 8755.5 8769.0 8.773.5 8.777.0 8778. o 8779' 0 8780.0 8780.5 8781'. 0 8784.0 8789.0 8790.5 8791.5 8795.0 8.795.5 8796.5 8801.0 8808.5 8572.0 8582.5 8585.0 8587.0 8595.5 8599.0 8602 · 5 8607.5 8621.5 8622.0 8635.5 8636.5 8637.0 8637.5 8638.5 8639.0 8641.5 8643.0 8645.5 8646.5 8651.0 8651.5 8652.5 8665.0 8665.5 8667.0 8667.5 8669.5 8674-0 8675.0 8678.5 8679.0 8683.0 8685.5 8686.5 8693.0 8697.0 8697.5 8750.5 8751.0 8751.5 8755.0 8755.5 8768.0 8772.5 8776.5 8777.5 8778.0 8779.0 8779.5 8780.0 87'83.0 8788.0' 8790.0 8791.0 8793.5 8794.0 8794.5 8799.5 8806.5 8809.0 8811.5 8812.5 8820.5 8868.0 8869.0 8870.0 8874.5 8879.5 8880.5 8881,0 8944,5 8958,0 8958,5 8959,0 8960,0 8960.5 8975,0 8982,0 9036.5 9038,0 9039,.5 9042,5 9043.0 9044,5 9045,5 9046,0 9047,5 9055,0 9056.0 9056.5 9132,0 9132.5 9133.0 9133.5 9135.0 9136.5 9137,0 9137.5 9147,0 9148.0 $ REMARKS: 8807.5 8810.0 8810,5 8818.5 8867,0 8868,0 8868,5 8873,0 8878.0 8878.5 8879.0 8943.0 8956.5 8957.5 8958,0 8959.5 8960,0 8974,0 8980.5 9035,0 9037,5 9038,5 9041.0 9042.0 9043.5 9046.0 9046.5 9047.0 9054.0 9054,5 9055,0 9131.5 9132.0 9133.0 9133.5 9134.0 9135.5 . . 9136.5 9137.0 9148.5 9149.5 CN/GR Cased Hole. REFERENCE LOG: ACOUSTILOG, DATED: WELL TEST SUMMARY TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE NET WATER RATE FORMATION-GAS RATE LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLDPRESSURE HOURS MPBD MBOPD MBWPD MMSCFD SCF/STB MMSCFD PSIG SCF/ST SCF/BBL PSIG 2 5-,.Tu'L- 8 2 03-JAN-96 2.0 1.10 1.09 0.01 12.47 11436 0.00 0 11436 11322 49.6 2302 MANIFOLD TEMPERATURE DEGF WATER CUT (CALC) PCNT 134 1.0 NEUTRON LOG PARAMETERS: LIMESTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. · / ? ?MATCHiA. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0. 5000 FILE SUMNARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 8491.0 9168 . 0 2418 8500.0 9177.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH NPHI 8486.5 8485.5 8507.0 8506.0 8511.0 85'10.0 8533.5 8532.0 8534.0 8533,0 8534.5 8533.5 8535.5 8534.0 8536.5 8535.0' 8553.0 8552.0 8554 · 0 8552 . 5 8554.5 8553.0 8571.0 8571.0 8571.5 8571.5 8573.0 8572.0 8583.5 8582.5 8586.0 8585.0 8587.0 8587.0 8595.5 8595.5 8598.5 8599.0 8602.0 8602.5 8607.5 8607.5 8611.5 8611 · 5 8621.5 8621.5 8622.5 8622.0 8636.0 8635.5 8636.5 8636.5 8637.0 8637.0 8638'. 0 8637 . 5 8639. 0 86-38 · 5 8640.0 8639.0 8642.0 8641.5 8644.0 8643.0 8646.5 8645.5 8647.0 8646.5 8651.5 8651.0 8652.5 8651.5 8653.0 8652.5 8665.5 8665.0 8666.5 8665.5 8668.0 8669.0 8671.0 8675.5 8676.0 8679.5 8680.5 8684.5 8687.0 8687.5 8694.0 8698.0 8699.0 8750.5 8751.0 8752.0 8757.5 8769.0 8773.5 8777.0 8778.0 8779.0 8780.0 8780.5 878].. 0 8784 · 0 8789.0 8790.5 879]..'5 8795.0 8795.5 8796.5 8800.5 8808.5 8809 · 0 881i. 5 8812.5 8820.5 8868 · 0 8869.0 887 0.0 8874.5 8879.5 8880.5 8881'. 0 8944.5 8958.0 8958.5 8959; 0 8960.0 8960.5 8975.0 8982.0 9036.5 9038.0 9039.5 9042.5 9043 .'0 9044.5 9045.5 8667 · 0 8667.5 8669 · 5 8674.0 8675.0 8678.5 8679.0 8683.0 8685.5 8686.5 8693.O 8697 · 0 8697.5 8750 · 5 8751.0 8751.5 8755.0 8768.0 87-72 · 5 8776.5 87-77 · 5 8778.0 8779 · 0 8779.5 8780.0 8782.5 8788.0 8790.0 87~,91 · 0 8793.5 8794.0 8794 · 5 87-98 · 5 8806.5 8807.5 8810 · 0 .8810.5 8818.5 8867.0 8868.0 8868 · 5 8873.0 8878.0 8878.5 8879.0 8943.0 8956.5 8957.5 8958 · 0 8959 · 5 8960.0 8974.0 8979 · 0 9035.0 9037.5 9038.5 9041.0 9042.0 9043.5 9046 · 0 9046.0 9047.5 9055.0 9056.0 9056.5 9132.0 9132.5 9133.0 9133.5 9135.0 9136.5 9137.0 9137.5 9142.0 9151.0 9046.5 9047.0 9054.0 9054.5 9055.0 9131.5 9132.0 9133.0 9133.5 9134.0 9135.5 9136.5 9137.0 9141.0 9149 · 5 PASS 1. FUCT & NUOT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. /??MATCHiB.0UT $ CN WN FN COUN STAT * FORMAT RECORD BP EXPLORATION (ALASKA) C - 21 *' PRUDHOE BAY NORTH SLOPE ALASKA (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units Size I GRCH 2418 68 i GAPI 4 2 NPHI 2418 68 i PU-L 4 3 FUCT 2418 68 i CPS 4 4 NUCT 2418 68 i CPS 4 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 30 API API API API Log Crv Crv Length Typ Typ Cls Mod 4 42 995 99 1 4 42 995 99 1 ,,~,4~.42 995 99 1 "4 42 99'5 99 i 16 Tape File Start Depth = 9195.000000 Tape File End Depth = 8455.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 ? 406 datums Tape Subfile: 2 377 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 8491.0 9168.0 2418 8500.0 9177.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: I ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH GRCH NPHI 8486.5 8485.5 8495.5 8494.5 8-505.0 8504.0 8529.0 8527.0 8534.5 8533.5 8535.5 8534.0 8538.0 8536.5 8546.0 8544.5 8547.0 8545.0 8548.0 8545.5 8548.5 8546.5 8549.0 8547.5 8547.0 8549.5 8548.5 8548.5 8551.0 8550.0 8552.0 8550.5 8553.0 8551.5 8554.0 8552.0 8560.5 8559.5 8561.0 8560.5 8561.5 8561.0 8562.0 8561.0 8566.0 8566.0 8567.5 8567.5 8568.5 8568.0 8569.5 8568.5 8574.0 8573.0 8575.0 8573.5 8575,5 8574.5 8586.0 8585.0 8585.0 8586.5 8586.0 8587.5 8587.5 8589.5 8589.0 8590.5 8590.5 8591.5 8591.5 8592.0 8592.5 8595.5 8596.0 8596.5 8596.5 8599.0 8603.0 8604.0 8605.0 8606.0 8607.0 8608.5 8609.5 8610.0 8621.5 8622.5 8630.0 8631.0 8632.5 8633.0 8634.0 8635.0 8638.5 8639.5 865O.5 8651.0 8652.0 8652.5 8654.0 8665.0 8665.5 8666.5 8667.5 8668.5 8669.5 8670.5 8676.5 8677.0 8677.5 8678.5 8687.5 8688.0 8688.5 8698.5 87.00 · 0 8704.5 8707.5 8714.5 8715.5 8716'5 8720.5 8723.0 8726.0 8727.5 8730.5 8731.5 8732'.0 8734.5 8735.5 8743.0 8.749.5 8750.5 8751.5 8752.0 8753', 0 8599.5 8606.5 8609.5 8621.5 8622.0 8665.0 8665.5 8667.5 8668.0 8686.0 8687.0 8703.5 · . 8721.5 87'24.5 8751.0 8603.0 8604.0 8604.5 8605.5 8606.0 8607.5 8608.0 8610.0 8630.0 8630.5 8632.0 8633.0 8634.0 8634.5 8638.0 8638.5 8649.5 8650.5 8652.5 8653.0 8653.5 8664.5 8665.5 8667.5 8668.0 8669.0 8675.0 8676.0 8676.5 8677.0 8686.5 8687.5 8697.5 8698.5 8706.0 8714.5 8715.5 8716.0 8720.0 .o 8728.0 8731.0 873i.5 8732.0 8734.0 8734.5 8743.0 8749.5 8750.0 8750.5 8751.0 8759.0 8760.0 8762.0 8762.5 8763.5 8767.0 8767.5 8768.0 8768.5 8772.5 8773.0 8773,5 8775~5 8776.0 8776.5 8777.0 8778.0 8779.0 8789.0 8791.0 8792.0 8795.0 8805.0 8805.5 8806.0 8810.5 8811.0 8812.5 8813.0 8823.0 8830.0 8832.5 8848.0 8849.0 8849.5 8850.0 8852.0 8856.5 8858.0 8865.0 8865.5 8868.0 8868.5 8869.0 8879.0 888O.O 8880.5 8881.5 8885.0 8890.5 8891.5 8905.0 8905.5 8906.5 8907.0 8908.0 8909.5 8934.5 8935.0 8936.0 8766.0 8766.5 8767.0 8771.5 8772.5 8773.0 8774.5 8788.0 8793.5 8803.5 8804.0 8809.0 8809.5 8810.5 88,11.0 8848.0 8851.0 8866.0 8866.5 8867.5 8757.0 8757.5 8759.5 8760.5 8761.5 8767.5 8775.0 8775.5 8776.0 8777.0 8777.5 8789.5 8790.0 8803.5 8821.5 8828.5 8831.5 8847.0 8847.5 8848.0 8849.0 8855.5 8856.5 8863.5 8864.5 8867.0 8867.5 8877.5 8878.0 8878.5 8880.0 8883.5 8888.5 8889.0 8903.5 8904.0 8904.5 8905.0 8905.5 8907.0 8934.0 8934.5 8935.0 8938.0 8941.5 8943.0 8944.0 8944.5 8945.5 8949.0 8950.0 8951.0 8952.5 8957.5 8958.5 8959.5 8963.0 8964.0 8965.0 8965.5 8971.0 8973.0 8975.0 8975.5 8976.0 8976.5 8977.0 8978.0 8989.5 8990.5 8991.5 8992.0 8995.5 8996.5 9008.0 9008.5 9012.0 9012.5 9033.0 9033.5 9040.5 9041.0 9043.5 9044.0 9044.5 9046.0 9046.5 9047.5 9048 o 0 9048.5 9049.5 9050.0 9051.0 9064.5 9084.5 9086.5 9089 o 0 9090~0 9091,0 9095.5 9096.5 9103.0 9110.0 8940.0 8974.0 8974.5 8975.0 9039.0 9040.0 9042.5 9043.0 9046.0 9047.0 8937.0 8940.0 8941.5 8942.0 8943.0 8944.0 8947.0 8948.0 8948.5 8950.0 8956.0 8957.0 8958.5 8962.0 8962.5 8963.5 8964.5 8970.0 8971.5 8973.5 8974.0 8975.0 8975.5 8987.0 8987.5 8988.5 8989.5 8993.0 8993.5 9005.0 9006.0 9009 .'5 9010.5 9031.0 9032.0 9042.5 9043 ~.5 9045 .'0 9046.0 9048.0 9048.5 9049.0 9049.5 9063.0 9083.5 908-5.5 9088.5 9089.5 9090.0 9094.5 9095.0 9101.5 9109.5 9113.0 9113.5 9114.0 9115.0 9116.0 9117.0 9118.0 9119.5 9120.5 9126.0 9135.5 9136.5 9137.5 9138.0 9138.5 9144.5 9145.0 9147.0 9147.5 9149.0 9154.5 9155.5 9156.5 9159.5 9160.0 9161.0 9169.5 9170.0 9170.5 9171.5 9172.0 9173.0 9182.5 9183.0 9184.0 9184.5 9185.0 9~85.5 REMARKS.' 9126.5 9147.5 9148.5 9150.5 9151.0 9163.0 9172.0 9172.5 9112.5 9113.0 9113.5 9114.5 9115.0 9116.0 9116.5 9118.0 9118.5 9134.5 9135.5 9136.0 9136.5 9137.5 9143.5 9144.5 9154.0 9154.5 9155.0 9158.5 9159.0 9159.5 9168.0 9169.0 9169.5 9170.0 9170.5 9172.0 9181.5 9182.5 9183.5 9185.5 9186.0 9186.5 PASS 2. .. FUCT & NUCTWERE SHIFTED WITH NPHI. CN WN FN COUN *STAT / ? ?MATCH2A. OUT / ? ?MATCH2 B. OUT $ : BP EXPLORATION (ALASKA) : C- 21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units I GRCH 2418 68 I GAPI 2 NPHI 2418 68 i PU-L 3 FUCT 2418 68 I CPS 4 NUCT 2418 68 I CPS A~T A~! A~I A~! Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 16 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 30 Tape File Start Depth = 9195.000000 Tape File End Depth = 8455.000000 Tape File Level Spacing = 0.500000 · Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7406 datums Tape Subfile: 3 320 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBUTOOL CODE GRCH 2418 $ # CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 # START DEPTH STOP DEPTH 8491.0 9168.0 8500.0 9177.0 BASELINE DEPTH 8'486.5 8495.5 8505.0 8506~5 8524.5 8534.5 8536.0 8537.0 8538.0 8538.5 8539.5 8541.5 8542.5 8543.5 8544.0 8546~0 8548.0 8548.5 8549.5 8550.5 8551.5 8556.5 8562.5 8567.5 8568.0 8571.0 8573.5 8586.0 8586.5 8587.0 8589.0 858'9.5 8590.0 8590.5 8592.5 8593.5 8595.5 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... ' GRCH NPHI 8485.5 8494.5 8504.0 8506.0 8523.5 8534.0 8535.5 8536.0 8585.0 8587.0 8589.0 8590.0 8593.0 8593.5 8595.5 8536.5 8537;0 8537.5 8538.0 8540.0 8540.5 8541.5 8542.5 8544.5 8547.5 8548.5 8549.5 8550.0 855O.5 8554.5 8563.0 8568.0 8569.0 8572.0 8572.5 8585.0 8586.0 8589.5 8590.5 8599.0 8600.0 8601.0 8601.5 8605.5 8606.5 8607.5 8615.0 8615.5 8623.0 8624.0 8634.0 8635.0 8637.0 8638.0 8646.5 8647.0 8647.5 8649.0 8649.5 8650.0 8651.5 8652.0 8652.5 8653.5 8654.0 8655.0 8666.5 8667.5 8668.0 8668.5 8669.5 8670.5 8673.5 8674.5 8676.5 8677.0 8678.0 8679.0 8688.5 8689.0 8692 .'5 8699.0 8706.5 8714.0 8719.5 8724.0 8726'0 8726.5 8727.0 8.731.0 8747.5 8748.5 8749.5 8750.5 8751.5 8752.0 8753.0 8754.0 8762.5 8602.0 8606.0 8606.5 8623.0 8623.5 8648.5 8649.5 8654.0 8654.5 8666.0 8667.0 8687.5 8688.5 8692.0 8697.5 8751.0 8599.0 8599.5 8600.5 8601.5 8606.5 8607.0 8614.5 8615.5 8634.0 8634.5 8636.5 8637.0 8645.5 8646.5 8647.0 8650.0 8651.5 8652.5 8653.0 8653.5 8667.5 8668.0 8669.0 8669.5 8672.5 8673.0 8675.0 8676.0 8677.0 8677.5 8687.0 8688.0 8705.'5 8714.5 8720.0 8724.0 8726.0 8726.5 8727.0 8731.0 8748.0 8749.0 8749.5 8750.5 8751.0 8751.5 8752.0 8760.5 8765.0 8771.0 8777.0 8778.0 8779.0 8788.5 8790.5 8795.0 8797.0 8797.5 8798.0 8806.0 8808.5 8810.5 8811.5 8812.0 8826.5 8828.0 8829.0 8829.5 8830.0 8832.5 8833.5 8849.0 8850.0 8851.0 8853.0 8857.5 8859.5 8860.0 8863.0 8864.0 8868.5 8870.5 8871.5 8872.0 8873.0 8874.0 8880.5 8881.5 8882.0 8883.5 8891.5 8906.0 8906.5 8907.5 8908.0 8935,0 8935.5 8939, 0 8943:. 0 8944.0 8948.0 8948!. 5 8S49.5 8950.5 8951.0 8952', 0 8952.5 8953.5 8788.0 8793.5 8795.5 8796.0 8796.5 8804.5 8806.0 8809.5 8828.0 8829.0 8867.0 8879.0 8947.0 8947.5 8948.0 8949.0 8764.0 8770.0 8776.5 8777.5 8778.0 8789.5 8795.5 8809.0 8809.5 8824.5 8826.5 8828.0 8832.0 8833.0 8847.5 8848.5 8849.0 8851.0 8856.5 8858.5 8859.5 8862.5 8863.0 8869.5 8870.0 8871.0 8872.0 8872.5 8880.0 8881.0 8882.5 8889.5 89.04.5 8905.0 8905.5 8906..0 8934.5 8935.0 8937.5 8941.5 8942.0 8949.0 8949.5 8950.0 8952.0 8955.5 8956.0 8956.5 8974.0 8975.0 8975.5 8976.5 8977.5 8978.5 8979.0 8982.0 8983.0 8984.0 8985.0 8986.0 8987.5 8992.0 8993.0 8998.0 8999.0 9000.0 9000.5 9010.0 9013.0 9024.5 9029.5 9030.0 9033.5 9041.0 9042.0 9042.5 9043.0 9045.0 9045.5 9046.0 9046.5 9047.5 9048.0 9048.5 9049.0 9049.5 9050.5 9058.5 9075.0 9080.5 9086.0 9088.0 9092.0 9095.0 9107.0 9108.0 9113 '. 0 9115.0 9116.0 9116.5 9117.5 9120.5 9121.0 9122.5 9124~. 5 8954.5 8975.5 8976.0 8977.0 8978.0 8980.5 8982.0 8982.5 8986.0 9029.0 9044.0 9044.5 9046.5 9080.0 9085.5 9123.o 9125.0 8954.5 8955.5 8973.0 8973.5 8974.0 8974.5 8983.0 8983.5 8989.5 8990.0 8995.0 8995.5 8996.5 8998.5 9008.5 9011.5 9022.5 9027.5 9032.5 9040.0 9040.5 9041.0 9042.0 9044.0 9045.0 9046.0 9046.5 9047.5 9048.5 9049.0 9049.5 9057.5 9074.5 9087.5 9091.0 9094.0 9108.0 9109.0 9113.0 9115.0 9115.5 9116.0 9116.5 9119.5 9120.5 9126.0 9126.5 9127.0 9135.0 9135.5 9136.5 9137.5 9144.5 9145.5 9146.0 9146.5 9148.0 9153.0 9153.5 9154 · 5 9155.5 9156.0 9159.0 9159.5 9160.5 9161.0 9170.0 9170.5 9182.5 9183.0 9185.0 9185.5 $ REMARKS: 912.5.5 9126.0 9126.5 9135.0 9135.5 9136.0 9137.0 9144.5 9146.5 9149.0 9153.0 9154.0 9155.0 9155.5 9156.0 9158.5 9159.o 9159.5 · 9163.0 9172.0 9172.5 9181.5 9184.5 9186.5 9163.0 9187.0 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN CO~FN STAT · / ? ?MATCH3A. OUT / ??MATCH3B. OUT $ BP EXPLORATION (ALASKA) C - 21 PRUDHOE BAY NORTH SLOPE ALASKA (TYPES 64) · . ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units I GRCH 2418 68 2 NPHI 2418 68 3 FUCT 2418 68 4 NUCT 2418 68 I ' GAPI I 'PU-L I CPS i CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 i * DATA RECORD (TYPE# O) TOtal Data Records: 30 1006 BYTES * 16 .Tape File Start Depth = 9195.000000 Tape File End Depth' = 8455.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet. **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14812 datums Tape. Subfile: 4 308 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 8491.0 9168.0 2418 8500.0 9177.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: I BASELINE DEPTH 8486.5 8495.5 8510.0 8510.5 8511.5 8534.5 8538.0 8539.0 8539.5 8540.0 8540.5 8541.5 8542.0 8543.0 8543.5 8544.0 8546.0 8547.0 8548.0 8550.5 8554.0 8558.0 8558.5 8559.5 8560.5 8561.0 8571.0 8571.5 8572.0 8573.0 8582.0 8586.0 8586.5 8587.5 8588.5 8589.0 8590.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH NPHI 8485.5 8494.5 8509.0 8510.0 8511.0 8533.0 8538.0 8539.0 8539.5 8540.0 8552.5 8570.5 8571.0 8571.5 8584.5 8 89.o 8537.0 8537.5 8538.0 8540.0 8540.5 8541.0 8542.0 8544.0 8544.5 8545.0 8547.5 8557.5 8558.0 8558.5 8559.5 8561.0 8571.0 8571.5 8581.0 8584.5 8586.0 8587.0 8587.5 8589.0 8590.5 8591.0 8591.5 8592.5 8604.5 8605.5 8608.0 8608.5 8609.0 8610.0 8610.5 8611.5 8613.0 8613.5 8615.0 8616.0 8620.0 8621.0 8623.5 8624.0 8628.0 8629.0 8633.0 8634.0 8634.5 8635.5 8638.0 8638.5 8639.0 8639.5 8644.0 8644.5 8646.0 8647.0 8648.0 8649.0 8649.5 8650.0 8650.5 8651.0 8651.5 8652.0 8652.5 8656.5 8657.0 8664.5 8665.5 8667.0 8667.5 8668.5 8669.0 8670.0 8670.5 8671.5 8678.5 8679 · 0 8687.5 8688.0 8689.0 8689.5 8610.5 8611.0 8632.5 8633.0 8633.5 8635.0 8638.0 8638.5 8648.5 8649.5 8650.5 8651.0 8652.0 8664.0 8664.5 8666.0 8667.0 8686.0 8687.0 8590.5 8591.5 8592.0 8592.5 8604.5 8605.0 860'7.5 8609.0 8609.5 8610.0 8613.0 8614.0 8615.5 8616;0 8620.0 8620.5 8623.0 8624.0 8628.0 8628.5 8634.0 8634.5 8637.0 8637.5 8642.5 8643.5 8645.0 8647.0 8648.0 '8648.5 '.. 8649.0 8650.0 8651.0 8655.5 8656.5 -. 8667.0 8667.5 8668.0 8668.5 8669.0 8669.5 8676.5 8677.5 8687.5 8688.5 8692.5 8693.5 8695.0 8698.5 8700.5 8701.5 8708.0 8713.5 8715.5 8716.0 8717.5 8724.0 8731.0 8731.5 8732.0 8732.5 8739.5 8740.0 8742.0 8742.5 8743.0 8750.5 8751.0 8751.5 8752.5 8753.5 8763.0 8764.5 8771.0 8777.5 8778.0 8779.0 8788.5 8790.5 8791.5 8792.0 8792.5 8795.0 8805.0 8805.5 8806.0 8808.5 8809.5 8811.0 8827.5 8828.5 8829.5 8830.5 8831.0 8847.0 8847.5 8848.0 8849.0 8849.5 8850.0 8854.0 8854.5 8855.5 8865.5 8867.5 8691.5 8692.0 8697.0 8730.5 8731.5 8750.0 8751.0 8751.5 8787.5 8789.5 8790.0 8790.5 8793.0 8803.0 88O4.0 8804.5 8809.0 8825.0 8826.0 8826.5 8827.5 8694.0 8699.0 8699.5 8706.0 8712.0 8714.0 8715.0 8716.5 8723.5 8730.5 8731.0 8738.5 8739.5 8741.5 8742.0 8742.5 8750.5 8751.0 8751.5 8761.0 8763.0 8769.5 8776.5 8777.0 8777.5 8789.0 8789.5 .. 8806.5 8807.0 8828.5 8845.5 8846.5 8847.0 8847.5 8848.0 8849.0 8853.0 8854.0 8855.0 8864.0 8866.0 8868.5 8869.0 8869.5 887O.0 8878.5 8879.0 8880.5 8882.O 8903.0 8903.5 8907.0 8907.5 8944.0 8946.0 8946.5 8.950.5 8951.5 8954.0 8955.0 8955.5 8959.0 8968.0 8971.5 8972.5 8975.0 8976.0 8977.0 8986.5 8987.0 8987.5 8988.0 8988.5 8989.5 8990.0 8991.0 8991.5 8995.0 8995.5 8996.5 8997.0 8999.5 9008.5 9009.5 9010.5 9013.0 9014.0 9016.0 9020.5 9024.5 9033.5 9036 · 5 9037.5 9039.0 9039.5 9040.0 9040.5 9043,0 9044.0 9046.5 9047.0 8866.0 8867.0 8867.5 8868.5 8879.0 8942.0 8944.0 8945.0 8985.5 8996.0 8996.5 9014.5 9038.5 9039.5 9042.0 9042.5 8866.5 8876.5 8877.5 8880.5 8900.5 8901.0 8905.0 8905.5 8947.0 8948.0 8953.0 8954.0 8955.0 8958.5 8967.0 8970.'5 8971.0 897'3.5 8974.0 8974.5 8984.0 8984.5 8985.0 8986..0 8986.5 8987.0 8987.5 8988.5 8993.5 8.994.5 8997.0 9007.5 9008.5 9009.0 9011.5 9012.0 9018.5 9022.0 9032.0 9035.0 9035.5 9037.0 9038.0 9045.0 9046.0 9047.5 9054.5 9062.5 9065.0 9067.0 9077.0 9078.5 9083.0 9115.0 9116.0 9117.0 9117.5 9118.5 9120.0 9121.0 9121.5 9134.5 9135.0 9136.0 9136.5 9137.0 9137.5 9145.0 9145.5 9146.0 9153.5 9154.0 9154.5 9155.0 9156.0 9157.0 9161.0 9170.0 9170.5 9171.0 9173.0 9182.0 9182.5 $ REMARKS: 9046.0 9134.5 9135.0 9136.5 9145.5 9146.5 9163.0 9172.0 9172.5 9053.5 9061.0 9063.5 9065.0 9076.0 9077.5 9083.0 9115.0 9115.5 9116.0 9116~5 9117.0 9118.5 9120.5 9121.0 9135.0 9135.5 9136.5 9144.0 9145.0 9153.0. 9153.5 9154.0 9154.5 9155.0 9155.5 9168.5 9169.0 9172.0 9181.0 9181 .'5 PASS 4. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH4A- OUT /??MATCH4B.OUT $ BP EXPLORATION (ALASKA) C -'21 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT 'RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units i GRCH 2418 68 I GAPI 2 NPHI 2418 68 i PU-L 3 FUCT 2418 68 i CPS -4 NUCT 2418 68 I CPS API AP! API A~! Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 1 4 4 42 995 99 i 16 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 30 Tape File Start Depth ~ '9195.000000 Tape File End Depth = 8455.000000 Tape.File Level Spacing = 0'.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14812 datums Tape subfile: 5 319 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass I gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418' $ REMARKS: CN WN FN COUN STAT 1, 2, 3, 4 1, 2, 3, 4 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 4 PASSES. $ : BP EXPLORATION (ALASKA) : C- 21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units AP1 API AP1 AP1 Log Crv Crv Size Length Typ Typ Cls Mod i GRCH CNAV 68 i GAPI. 2 NPHI CNAV 68 i PU-L 3 FUCT CNAV 68 I CPS 4 NUCT CNAV 68 i CPS 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 4 4 38 995 99 1 16 * DATA RECORD (TYPES 0) 1006 BYTES * Total Data Records: 30 Tape File Start Depth = 9195.000000 Tape File End. Depth = 8455.000000 Tape File Level spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 22218 datums Tape Subfile: 6 53 records... Minimum record length.- 62 bytes Maximum record length: 1006 bytes. Tape Subfile 7 is type.- LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8465.0 2418 8474.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9178.5 9187.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR SBAR SINKER BAR PcM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ .BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): IX)GGER'S CASING DEPTH (FT): BOP. EHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): · GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: · HOLE CORRECTION (IN): 04-JAN-96 FSYS REV. J001 VER. 1.1 1138 04-JAN-96 9237.0 9180.0 8500.0 9177.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA 0.000 9280.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL LIMESTONE 0.00' 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): O. 0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT. RATE LOW SCALE (CPS): 4 FAR COUNT RATE HIGH SCALE (CPS): 404 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT BP EXPLORATION (ALASKA) : C- 21 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code. Samples Units I GR 2418 68 I GAPI 2 CNC 2418 68-. I PU-L- 3 CN 2418 68 i PU-L' 4 LSN 2418 68 I 'CPS - 5 SSN 2418 68 i CPS 6 CCL 2418 68 1 7 SPD 2418 68 1' F/MN 8 TEN 2418 68 i LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 106 Tape File Start Depth = 9191.000000 Tape File End Depth = 8455.000000 Tape File Level Spacing = 0.250000 ~Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 41318 datums Tape Subfile: 7 Minimum record length= Maximum record length.- 183 records... 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8476.0 2418 8485.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: LOG ER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9180.5 9189.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR SBAR SINKER BAR PCH PCH/CCL GR. GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE. AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT' WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (,IN): 04-JAN-96 FSYS REV. J001 VER. 1.1 1225 04-JAN-96 9237.0 9180.0 8500.0 9177.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA 0. 000 9280.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0. 000 0.000 0.000 0.0 THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING. WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 4 FAR COUNT RATE HIGH SCALE (CPS): 404 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2 · $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : C-21 :.. PRUDHOE BAY : NORTH SLOPE : ALASKA *' FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool' Code.' Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR 2418 68 1 2 CNC 2418 68 1 3 CN 2418 .68 1 4 LSN 2'418 68 1 5 SSN 2418 68 1 6 CCL 2418 68 1 7 SPD 2418 68 1 8 TEN 2418 .68 1. GAPI PU-L · . PU-L CPS .' CPS LB ' 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPES. 0) 1014 BYTES'* Total Data Records: 105 Tape File Start Depth· = 9193.000000 Tape File End Depth = 8465.000000 Tape File Level'Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 48436 datums Tape Subfile: 8 Minimum record length= Maximum record length= 182 records... 42 bytes ~ 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER= DEPTH INC~EMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8475.0 2418 8484.0 $ LOG HEADER DATA DATE LOGGED= SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) ': TD LOGGER (FT) TOP LOG INTERVAL (FT) BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO) STOP DEPTH 9180.5 9189.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT)': BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): ' GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 04-JAN-96 FSYS REV. J001 VER. 1.1 1308 04-JAN-96 9237.0 9180.0 8500.0 9177.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA 0.000 9280.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 '0.'000 0. 000 0.000 0.0 THERMAL LIMESTONE 0.00 0.000 f BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 4 FAR COUNT RATE HIGH SCALE (CPS): 404 NEAR 'COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : C- 21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPEf '64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GR 2418 68 2 CNC 2418 68 3 CN 2418 68 4 LSN 2418 68 5 SSN 2418 68 6 CCL' 2418.. 68' 7 SPD 2418 68 8 TEN 2418 68 GAPI PU-L' PU-L CPS CPS LB 4 4 42 310 01 1 4 4 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 i 32 * DATA RECORD (TYPES O) 1014 BYTES * Total Data Records: 105 Tape File Start Depth' = 9193.000000 Tape File End Depth = 8465.000000 Tape File Level.Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 67536 datums Tape Subfile: 9 Minimum record length.' Maximum record length: 182 records... 42 bytes 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0. 2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8477.0 2418 8486.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9180.5 9189.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (PT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTI°N (IN): 04-JAN-96 FSYS REV. J001 VER. 1.1 1352 04-JAN-96 9237'.0 9180.0 8500.0 9177.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA 0.000 9280.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0.000 - 0. 000 0.000 0.0 THERMAL LIMESTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (PT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 4 FAR COUNT RATE.HIGH SCALE (CPS): 404 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS ~ PASS 4. $ COUN STAT BP EXPLORATION (ALASKa) : C- 21 PRUDHOE BAY NOR'TH SLOPE ALASKA * FORMAT RECORD -(TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units' GR 2418 68.' 1 CNC 2418 68 1 · . CN 2418 68 1 LSN 2418 68 1 SSN 2418 68 1- CCL 2418 .68 1' SPD 2418 68 1 TEN 2418 68 i GAPI .PU-L PU-L CPS. CPS' F/MN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 42 310 01 1 4 4. 42 995 99 1 4 4 42 890 01 1 4 4 42 334 31 1 4 4 42 334 30 1 4 4 42 150 01 1 4 4 42 636 99 1 4 4 42 635 99 1 32 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records.: 105 Tape File Start Depth = 9193.000000 Tape File End Depth = 8465.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation, code decoding summary: Rep Code: 68 74654 datums .-. Tape Subfile: 10 Minimum record length: Maximum record length: 182 records... 42 bytes 1014 bytes Tape Subfile 11 is type: LIS 96/ 1/24 01 **** REEL TRAILER **** 96/ 01 Tape Subfile: 11 Minimum-record length: Maximum record length: 2 records... 132 bytes 132 bytes End of execution:. Wed 24 JAN 96 2:32p Elapsed execution time = 10.87 seconds. SYSTEM RETURN CODE = 0