Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout170-003DEPT. OF ENVIRONMENTAL CONSERVATION TONY KNOWLE$, GOVERIVOR DIVISION OF ENVIRONMENTAL HEALTH SOLID WASTE PROGRAM 410 WILLOUGHBY AVE JUNEAU, ALASKA 99687 http://www.state.ak.us/dec/deh Telephone: (907) 465-5162 Fax: (907) 465-5362 Mr. John AmundsenOctober 23, 2001 Forest Oil Corporation 340 K Street, Suite 700 Anchorage, Alaska 99501 ~ ~'O,, Reference: Issuance of Permanent Closure Approval for Inactive Reserve Pits located at'°~°n Sunrise Unit gl on the Kenai Peninsula and Lupine Unit #1 on the North Slope Dear Mr. Amundsen: The Alaska Department of Environmental Conservation (ADEC) has completed review and public notice for permanent cloSure approval of the reserve pits at Sunrise Unit # 1 and Lupine Unit # 1. The closure applications provided the required information describing the history of the reserve pit(s), the present condition of the reserve pits(s), results of any required water sampling and an assessment of the potential risks posed by the drilling waste to human health and the environment. At these locations, the reserve pits are backfilled and there is no exposed drilling waste. ADEC coordinated field inspections of the sites with the appropriate land managers. Public notice requesting comments on the closure requests was published September 20 and 21, 2001 in the Anchorage Daily News and posted on the state web site September 21,200 I. NO public comments objecting to closure approval were received in response to this public notice. ADEC has determined that the reserve pit at this site meets the Closure requirements of 18 AAC 60.440. Closure Approval Under authority of 18 AAC 60.440 (j), ADEC grants permanent closure approval to Forest Oil Corporation for the inactive reserve pits at the following sites' Well Name API Number MTRS Landowner Sunrise Lake Unit # I 50-133-20210-00 Sec. 15, T8N R8W, SM USFWS Lupine Unit # 1 50-223-20011o00 Sec. 3, T4S, R14E,UM DNR Forest Oil Corporation Mr. John Amundsen October ~, 2~ i Page 2 of 2 Terms and Conditions This permanent closure approval is subject to the following terms and conditions: 1) In accordance with. 18 AAC 60.440(1), the Department will require additional investigation, assessment, monitoring or remediation if new information regarding conditions at the reserve pit facilities indicates that further actions are necessary to protect human health or the envirOnment. 2) The approval granted by.this letter is for the inactive drilling waste reserve pit(s) only. Closure for the pad as a whole (if required) must be coordinated between the owner/operator and the appropriate land owner/manager. Any person who disagrees with any portion of this decision may request an adjudicatory heating in accordance with 18 AAC 15.200-310. The request should be mailed to the Commissioner of the Department of Environmental Conservation, 555 Cordova Ave. Anchorage, AK 99501. If a hearing is not requested within thirty (30) days of the date of this letter, the right of appeal is waived. If an adjudicatory hearing is requested and granted, this decision remains in full effect during the adjudicatory process. Sincerely, ! Heather Stockard Solid Waste Program Manager Heather Stockard @envircon.state.ak.us cc: Tom Maunder, AGOCC Gary Schultz, ADNR, Fairbanks Claire Caldes, USFWS, Soldotna PLUGGING & LOCATION CLEARANCE R~PORT State of Alaska .ALASKA 0IL & GAS CONSERVATION COMMISSION PTD No.~O Lease Memorandum To File: API No. Well Name Operator Location Note casing size, wt, depth, ~t vol, & procedure. Liner: Perf intervals - tops: Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. Well head ~t off: -- .. Marker post or plate: , Location Clear.ce: Conclusions: Code Date FOREST OIL CORPORATION Chairman Division of Oil & Gas Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99501 September 1, 1970 RE: Sunrise Lake No. 1 Section 15, T8N-R8W, SM Gentlemen: Enclosed in.duplicate is Form P-7 "Well Completion or Recompletion Report and Log" for the captioned well. Very truly yours, FOREST OIL CORPORATION H. E. Snider Division Production Manager :km Enc's 'Porto CONFIDENTIAL SUBMIT IN DUPLI (See structions on "~-" '"" reverse side) OIL AND GAS CONSr~ATION cOMMITTEE WELL cOMPLETION OR RECO I £ REpORT AND LOG * WELL WELL Other b. TYPE OF COMPLETION: ~-; OVeR " ~, q] ~ ':'i '," FOR~T OIL COR~RgTI~-' ~. *.D~.~, o, 0,~,*.o. ~10 let National }: uildin9 ~25 "G" Street, gnch~rage~ "~laska~ 99501 At top prod. interval reported belo~ ~' ~ At total de~ Same - De~tatton~~~A~tached 5. AP1 N~CAL CODE 50-133-20210 _ _ 6. ~E D~I~ON AND SnRI_A.L NO. A-051~30 7. IF LN-DIA.N, ALLOTTEE OR TR/BE NA_M~ None 8. UNIT,FARM OR LEASE NAME Sunrile Lake Unit 9. W~IL,L 1~O. 10. FEI~LD A~FD pO~L; OR WILD.,AT- 11. S~C,, O~E~) ' 5~: CASING 20" OD ~.~ (~ .i~ING P~COI~D i050 Sx, e SIZE ' ..; · TUBLI~(~ F~OO1R,D ,,. DEPTI-I SE~ · . AiVl OUNT PULLED ;30. : DATE FIRST R'~'ODUCT~ON ii ,]~ METIfOD (Flowh, g, gas lift, pumping--size; ...~,. DATE OF G~F. '::5 l:~ ~..': ~.~ - P~S~ CAL~~ OI~BBL. GA~. WA~B~. lOlL G~VITY-~ (C~.) o~ CAS (~4, ~*e4 ~;0r .::; ._r:~ WlT~SS~ ,,, . d ~2. LIST ~: ~*CHMENTS ~- ......... ~ell Hlstor' 4~ O~eg D~ Sub, ~t~ ~e~ rately 33. I herebz cortez th,t~e ~o,egolhg ~ at ~d ln,o~.o~;~ ,~ eo,,,~, ,. determined from ,ll-:,v,fl,ble ,eeo,ds ; Sm~D ~ a~ ~~/ :'~rt,~: ~b~VlS~On :'oroa,,cri~ M~r. DATE S/31/Tn *(See Instructions and S~ce, [or A6$itiOnal Data on Reverse Side) . FLOW I~P,.ESS. INSTRUCTIONS General: This form is designed~-for submitting a complete and correct w~l completio.~...report and log on all types of lands a.n~Jleases in Alaska. ' '~ _.I , , Item: 16: Indica..t.e,..w.h,'iich ele.~ai.~, n is u.~ied ,:{~ i~eference (whe~'.l~ not ;6the(~ise shown} for depth measureT-: ments given in r',.~s.~aces on Ut[bis form"' and in any atlachmeR~ts. :::': r..z ~" · " ;'"', ,.L~ '- '-' .... -- ~'.~. Items 20, nnd 2D:~.jlt~this well is completed for separatc praduction from:~more than'-".one interval zon~- (mult pie corr~plcti~'-'n)~,.O so- state in item 20, and in item 22 show the prcducing interval, d~ intervals',~ 'top(s), bottom(s~ a:~di.~ame (s) (if .any) for only the interval reported in item 30. Subm;q a Separate repo~t. ~' ,.~ [..' ~.j ,['J · ~ .. ~ . ,-. ,,-, u ,r'"a"'e~ on this .lorm,¥,., ,~ ,r~,qe,',uate~,,,,., ,,., ,.,;4en';ne4, for. each ad6itional interval ' ·., ~ .. to be seperately produred,, sho~¢ ~'~ ing the adlditid~al.id~ta pertinent to such int~'r~l. :'.-: -': n' ;-- ,~. r.) .'-'.:; Item26: '$acks!L~ent": Attached suPp~emen!~'~ records for this wOJi';shouldn:' show the details of any mul- ?.. tiple stage ceMe"nti:ng:-and, the Iocbtion of thelJ:-~ementing. ,--- tool. ,.._, ..q Item 28: Submit a separate completion repod ~n this'-form for each~ intO~val to be separately produc~l. (See instruction?'~c[.~'i~ms 20 and 22 al~.ve).' ~' - ...-, .. .... : ...... ~ _--~ 34. SUMMARY OF' FOI~ATION TES'I'~ INCLUDIN('i 'II~ERVAI.,'T~S~D. PR~6RI~. ~A~A~ ~OV~ O~ OIL. ~ ~.~ ' . ~ J ~ I ' r ;. ' ~'U 35. G~GIC c~ ~..9 '.~' [~ 'WA~ AND MUD ;~ p, . Tyonek F~. t..%~-, '"~--': "' "-::- c. ,.az:' ;~ ~.,~,s'. ~-~ v~r. ~... DST ~(: 11708 118~8 .... Packer faii'~d (op"~n h01e test) --? n , ~.~ -;~ DST ~2.~ 11~75 11878 Took p~ugged (open hol~'..~'est) ~ ~ Stefttng Fms ":.~:; surface.'~O'~ . DST ~3j.. 11629 1178D Tool did no~t open (opg-~ hole tea. t)"- Beluga Fm. DST ~&~ perf 11698" 11758 Packs~ failed ~t~'st tb~u' casing'~~ T~o~ek [m. >.~:J~;~555 ~ 7555 (-73~2 DST ~5~ perf 116984 11758 Flowed 30001: ~ater cushion plUs' -~>.i Hemlock ;,~gl~:',[~' ~i3865 ~: [3865 (~136 ~...) formation ~ate~';$,~ rat~'of 9 bb.l~/hr. U. ~ore~nd :"F~' ~6~05 .: ~05' ( 1~1 c.' :~:~, and' small ~'~0u~'~'~Sr g~ ~,~ ~h cs~t :' ::" .:': '-- ~ ~ '-~ '"" " DST ~:,._...~ f~e~_ 11170 lllB~ Tool al aa d~_u~$~: ::, ~, c: DST ~7'~ parr 11170 11186 Tool .pluggad..L, it.vsrsS-~ out 580~,' ~ati: r.: - -::,_r:~ ,. :,: 11220 11260 cushion-g 15~2fl' b'bls '~ .~:emen~ :ut ~bd :~Y "~' ~ ~ ''::~ 36. ~.E 'DATA. A3~ACI{ BRIEF D~CRIPI~ONS OF LITHOLOGY. ' '~ m-~ '' .,. .. DI~S '.i.) .~?~ POROSI?.~. [iFR AC~R~. APPaNT ...... ':3. ~' AND D~'I'ECq'~I} ~IIOWS O~ Ol~, G~ O~ ~A~I. ~ ;~ .... ~ · DST ~8.- perf 11170 lllB~ Recovered 6OQO'.~: er-:.'aush~on &~l~~ ~ ....~ 11220 11260 bbls. of cem~4-.;&~: 1~ ~bls. for~tiq~ u ~ter[~ " '.> ~;.', '. ,~": S23 ' . ' ' ' .} '~ '; ': No~e: .'.:' See addi~ional sheets fd~ dega[led description ~'~ Dr[ll~am.--ge~ ~s. . L2 /'" .,. C] ~.t z ".. C'T ~ '. ' ", , ) ) CONFIDENTIAL C P L, E 'T-,I 0 N R E P 0 R T 1 February 2-11 BUild-Access Reed- & Location. Drill Waterwell. Drive 30" OD Conductor. Casing to ~-iOve in & Ri9 Up 8rinkerhoff Drilling Co. Rig -.NO'. 12 February Spud 26" hale .~';.J 2200 hrs. 13-I5 February 16 Februa~ Drill 26" hale to 337~. Run (8) Joints of 20" OD, .H-~O~ .S.T&C, 9~..OO lbs/ft, casing equipped ~ith Float Shoe. Casing Landed ~9. 333~ Ground Level. Cement 20" OD Casing uith 950 Sx .Clas~ G Cement. Had full returns & Circulated l~O f~'.~ cement. 17 Feb~uar~ Install 20" - 2000 ~,Isp Hydril .on 20" OD Casing. .Preseure. test casing & DUPE to 500 psi ?o~ I{, hr. Drill .1~~ ho'lo. 18-21 22-23 February Drill 177~" hole to-255D'. Mud: 10.~ ppg Vis 67 'Run (~5) Joints ot 13 3/B" OD Casino equipped with Float Shoe'& Float Collar. Casing parted on top' 0¢ Joint ~. 36. Run Tri-State Type ~ Casino Spear & latch intb taP-of casing, Pull out o? hole & lay d~n all casing. 2~ February '"~" bit & drilling 'to condition Go in hole witt~ ~-,~ hole. Run. (6~) Joints of 13 3/8" OD Caaing, equipped with Float Shoe ~ Float Collar. Casing Set ~ 2537 GrOund Level. 25 February Cement 13 3/8" OD Casing with 2~00 Sx Class G Cement + ~'~ CaC12 + 0.1% DR 33 + ~ Diacel O. Had full ~etu~ns & circulated '~50 ft.~ cement. Cement 27 February · 28 February 1-11 12 March Instal~ 13.5/8-5000 psi' casinghead. Rig up DoUble Ge~e & Hy.dril bl'~out preventers with 2"-90[] Choke .& KfI1. manifolds & hydraulio control adjustable- choke...R~Sesu~e test DOPE g Casing to 2000 psi far ' GO-in'..hele with ~""' '"~ ... . ~.~' bit. Tag top ef cern[ ' . D~[II' Fl.~-[.-Colia~ ~ Fleet Shoe. T~ip f~ D~ill 9 ?/8" hole to 9093- Ci~cula[e. and condition hale fo~ lagging., Pull-oUt ef hale. ~uo, 9,6 ppg Uia ~3 ~ -.. . . ~ - Run Schi~berge~ DIL, Sonic, Density & SNP Logs. 13-23 P~rc.h · .- --'. Drill g 7/8" hOle~ to ll,~g2. Install 2"-lSO0'Choke .~-:_'-i.'..' ..... -..~?~?. &'Hill Manifolds. Pressure tes~ all DOPE to , ":':J".' ".... ' ~::.: ;'-.:'::<.::.-'?~..~?':::~O~.:~-~:a~.-':- 'TeS~ ~'uitnessed'':: b~:-U.S.GS, '.~q~;:' 'kl,C.:~ ~u-~fitcke-;~' - / - .....,./.: -..- ,.. -.- > /.::;:;- .-::: .:- ... .... . .. . ~, .. .. ,,~.. . . -';,)- [...~: . . ~ . .. . . . : ... ~ . ~ ~..: : ~ - . ~- ~ , .: .~ - 4729 KENT STREET Page CONFIDENTIAL C 0 M P L'ET ! R E P 0 R T Drill 9 ?/8" hole to I}.~888.. Circulate & condition bUlB ?or log&lng, Run Schlumberger DIL, Sonic,. Density. Oipmater & SNP Logs, M~: 9,? ppg Via 6G.' I0-13 April · 1..APril 15-16 April 19-20 April Drill 9 ?/B" hole to 1~,32~'. Pressure test BOPE to 2000 psi far ~.~ hour..-Circulate & condition hole far lagg-ing. Mud: 9.7 ppg Vis 5~ · Run Schl~mberger DIL. lug to 1~,310'. D~Ill 9 778" hmle~- J~ ~dA~,. ~o, ndL~ion mud A'hole Condition hole for drillm~em teat. Run 8~" oD Lvnes packe~s ~l~h S~add!e Tes~ ToOls. See seOe~a~e DST Ne. 1 RePo~ p~evlously sub~t~ed. ~-~-~ud. 9-7 ppg VLs 87 ._ Run 9 7/8" b~ A d~1llinB assembly ~o cend~on mud A hole. Pull ou~ of hole. Run 9%" OB Lynes Inflatable packe~s ~t~h S~add!e Tes~ Tools DST'-~o. 2. See DST No. 2 Report pr~fously submitted. {~ 9.7 ppg Vis 58 21-23 April 2~-2G April Pril 29 April 30 A'p~il -.- Trip. ~ith 9 ?/B"' drilling assembly to' condition · hole. Run ~.~"~ DD Lynes Inflatable packers ~ith Stzaddle Test Tools. See DST No. 3 Report previoumlv submitted. Trip ui~h 9 ?/8" drilling assemblv to condition hole. ~asu~e 5" GD drillpipe in hole open-ended to 1~,~29~, Mix & pump 26? Sx Claes G Cement + 1¼- ~re-hvdrated gel. Displace ~ith 5 bbls. ~ater & 2~2 bbls. mud. No suction or back-flew. CIP ~ 1850 hrs. Estimated cement top ~J 13,8G0~. Hang 5'"- 0O drillpiPe~a 12,213' open-ended. 18B Sx Clase ~ Cement. Dieplace ~tth 5 bbls. & ~O~ bbl,. mud. No suction or ~ack-fl~. ~D 1,155 n~s. Pull out of hule. !dait on cement. GO. in hole aith 9 7/8" drilling assembly, Drill cemen[ from 11,960 ~o 12~D32. Circulate & cOnditiOn -hole fo~ casing. Ran (305) Joints of 5~" DO Casing equipped ~ith .~ - Baker ~de.l B Flo~t Shoe & Float Collar. Set casing.~S 11,978~. Cement with ~55 Sx Class G Cement.+ 20% Diacel D + 1~-~ L~L; 85 Sx Class G Cement + D.~ Dtacel 'L~L ~umped pi'u9 ~/2DDO psi. A-Caller-Loca~o~ LoBs* ;-?~: -<::. <- -:?~-- ':. ': .... --,-' -.--';-' ':;~'-'-:-"' ' .......... Tag:.cemen~ top-?~ 11,939'.. .............. .-~-: -_ ,..:.,.../. ; .: . · _ . . .. -. .. :.... . .. ...' ~.- -~ Operator ~ ......... ~ ................................................. ~ ........... -k~ell Nam~ Sun~is~ Lake,-No'I -Tes~ casing & BOPE to 2000 psi for ~ t~r. Held ~h. Perforate in[orval 11,598-11,758 aith 2 shots/f~. Run 'Daker Full circulating Sub & tubing t~stor on 2 7/8' [}D tubing. See DoT No. ~ Report previouslv submitted Page 4729 KENT STREET C O -PL E T.i O- N REP'OR T _ Test ToOls for DST Nm. 5. See DST previouslv su~t.tted. Set 3ahnsan Permanen~ '2~tdge Plug ~ l~51B~. Perforate 9 I1 Mav Ran 5skor Full Bore Retrievable Packer with Baker Circulating Sub & Tubing Tester on 217/8" tubing for DST Ne. ~. See DST Ne. ~ Repe~ p~svtouslv submitted. - Mud~ 9.8 ppg Vis ~2 Ran B~ke~. Ful'l Do~e Ret~ieva~l~ Pamke~ ~l~h Oake~ Ci~culm~tmg Sub & Tubing Tes~e~ mn 2 ?/8" Tubing fe~ DST ~.~ ~. ~ee DST' No..~ Repom~ p~evteuelv Mud:' 10.5 ppg Vis 55 Ran aak~ $~odal C aa~rievable Cemente~ on 2 7/8"-' ~ubing a Set i~ ll~O0?. Mix & pump 650 5X Claes a Cement. Final 9isplacin9 p~essu~e ~500 psi. ~ai~ an cement. Ran .;~ drilling assemblV. Tag cement tap : 11,08~'. D~ill cement 11,08}' - 11,272'. Mud'. 1D.'~ ppg ~ts ~5 Pressure Test EOFE & cae&n9 to 2000 psi for i hr. Held'DSo Stumk casing perforator at 5,216'. i7-1'8 Ran '~" OD X 1 ~/8" overshot & recovered Collar Legator & Fi~ing Head. Ran ~" rotary & flatbattom mills. Mi'lied perforator free & pushed Junk to 11.~ ~62 ~ . ~0-21 May . - .. ~.-':.:.. 25 May · Perforated. intervals 11,170 - 11,186 & 11~220 - 11~260 a~h~ abets/ft. Ran Bake~ Re~rievamatt='Cementer Packer & ~.~del F TeSt - Stimulation Valve an 2 7/8" tubing far DST fie. 8.. See DST Ne. S rep~t previously submitted. Pump ~aste fluids ~own 2 ?/8.".tubing & ~hru ps~f~tions ~:i~ 11~170~.-il,260'~. ~tx & pump ~00 Sx Ciasa G Cement thru pe~fozations 8 11,170~-11',260~. Final displacing pressure 5,?00 psi. ~att on cement. Perforate interval 3,500'-3~515 with 1 shot/rt. using easing Perforator. Mix & pump ?00 Sx Class ~ -Cement, down 2 7/8" tubing thru pmrfaratians, with Bake~ Retrievama[[~ Packe~ Set 0 ~,1~5~. Final displaein9 pressure I~500 psi. ~ai~ on cement. Ran ~" drilling assembly & drill cement ?ram .' ':':i< '_-:~' ? '-:': i.-3une".-'.-" '. "'-. ~hru pe~foratianS' '~ith gaker-Re~fe-vamatfC Packer ~":"- ..... ~"" - Set ~ ~i~5:'. Mix & pump 150 Sx Claes G Cement . ~ daun tubl~ & thru perforations. Final displacing .:. :. ,... .. pressure 2~250 psi. * ": ' '" r ' ' - ' ' ~ ' * ~ .. /. - * '. -.. : . · ' - . .. - U~ll Name ~un~is__ gRILLING S RVIC;.$, INC. 4729 KENT STREET Page t .. Rare-2 ?/8~ ~ub~nu open-ended t.a 350' .. ~4~× & pu~p ~0 5x Class G Cement, d~n tubing, Cement ~ surface, Poi! tubing out of ho.la. =Ceaent in . piece :~ 105~I h~$, Plugging & abandoning aitnseaed by' U.'S.~S, install hole marker an 13 5/8" Casinghead. dO~n. Rig released ~i.~ 2~]0 h~s. FO~EST OIL CORPORATION Ope~ato~ .- ....................................................................................... Sunrise Lake No. 1 Well Narp. e ...... -- .. Page DRILLII G SEIiV CEf, i lC. 4729 KENT STREET ~O~E~ O~ L CO~ PO~AT ~ 0 N 425 "G" Street Suite 410 Anchorage, Alaska 99501 Transmitted herewith are the following materials pertain- ing to tile Sunrise Lake Unit No. 1 well Sec. 15 - T8N - R8W SM. Please acknowledge receipt by signing and returning one copy to this office. ITEM NO. PIECES DEPTH Dual Induction 2" DUal Induction 5" Mud Log DUal Induction Laterolog-Linear Well CUttings 1 Print 14,485 1 Reverse Sepia 1 Print 1 Reverse Sepia 1 Print 2560 - 14,500 1' Reverse Sepia 1 Print 8,864 l~Reverse Sepia 2560 - 14,500 Received by'i_ Date l~rm No. P--~ STATE OF ALASKA OIL AND GAS CONSERVATION CO/v~AAITTEE MONTHLY RE'PORT OF DRILLING AND WORKOVER OPERATIONS o,,.~== ~ o,,.~,~,.,. ['"'] o~.~,, ---CONFIDENTIAL :. ~ o~ OPm~.~TO~ FOREST OIL COR~ORATIOS 3. ADDRESS OF OP~TOR ~lU fiSt National Bank Building 425 "G" Street~ Anchorage~ Alaska~ 99501 4. ~CA~ON OF WF-J~ 1031~ FEL 1341~ FSL SE~ Sec 15 TeN 18± Miles N.E. of Naptowne RBW S.M. A-051430 None 8. U-NIT,F.~{ OR LEASE N.~ME Sunrise Lake Unit g. WELL NO. 1 10. 1,-~ A_ND POOL, OR WILDCAT i1. SEC., T., R., 1%{., (BO/'TOM HOLE 12, PERMIT NO. 70-13 13. R~ORT TOTAL D~ AT END OF MONTH, CI-LA~G~ IN HOLE SIZE, CASING AND CE1Vi~NG JOES INCLUDING DEPTH SET A1N-D VOLU/VIES USED, PEP,.FO.RATIONS, TESTS A1N-D ~SULTS, FISHING JO~, JLTNK ~ HO~ AND SIDE-TRACKED HOLE AND A.NY OTHER SIGNIFICANT CI-LA-NTG~ ~ HO~ ~N'DITIONS. 1. Run Temperature, Gamma-Ray & Collar Locator Logs. Top cement indicated ® 9150'. 2. Perforate interval 11,698 to 11,758. 3. Test perforated interval(make two test tool runs). Flowed milky-white water with Chloride content of 900ppm~. @ rate o~ 9bbls./hr. with 1-2' gas flame. 4. Set Permanent Bridge Plug @ 11,518'. 5. Perforate intervals 11s.170~ to 1~.~184~& 11~.220~ to 11,.260~. 6. Test perforated intervals(make two test tool runs). Tests unsuccessful due to tool plugging. 7. Cement thru perforations 11~.170~ to 11.~.260~ with 650 sks Class G Cement. Final displacing pressure 4500psi. 8. Drill Cement out of.5~" casing from 11,083' to 11,:272~. 9. Stuck perforating tools ~ 5216'. Fished out'collar locator and pushed perforating charges to 11s.462~. 10. Reperforate intervals 11:~.170~ to 11~.184 & 11,~220~ to 11~260~. 11. Tested perforated intervals. No flow to surface. Recovered water with Chloride content of 1200ppm. 12. Pump 7300± Bbls. waste fluid from reserve pit thru perforations ~ 11,170~ to 1fl,260~. 13~, Cement thru perforations ~ 11~170' to 11,.260' with 400 sks Glass G Cement. Cement top inside ~ casing estimated ~ 11,090'. 14. Perforated 5~" casing ~ 3500~ to 35~~'. 15. Cement thru perforations ~ 3500-15! with 700 sks Glass G Cement. Estimated cement top ~ 2100'. 16. Drill cement from 3458' to 3536'. 17. Perforated 5~" casing from 4260~ to 4275'. 18. Pump waste fluids from reserve pit thru perforations ~ 4260-75~. Pumping operation continuing ~ 2400hrs. on 31 May 1970. ce~,y~tha the fore.lng is e arid correct 14. I hereby ~.%~~ SIGNED ~ ,~/~/~. m?,.~.DRILLING SERVICES INC. n,.~ 13 June 1970 NOTE--Report on this form is required for each ~:alendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. Form P--3 REV. 9-30-6 9 CONFIDENTIAL Smbmit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATIO'N COMMI]'[EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not ~se this form for proposals to drill or to deepen Use "APP].ICATION 'FOR ~'ER~I'i'-~-~' 'for such 'p~o~osal-~.) · . ... WELL WELL OTHER 2. NAME OF OPERATOR FOREST OIL CORPORATION 3. ADDRESS OF OPERATOR 410 1st National Bank Building 425 "8" St., Anchorage. A!mskm 4. LOCATION OF WELL Atsurface 1031 FEL 1341t FSL SE~ Sec 15 TSN RSW SM 18~ Miles N. E. Naptowne 13. ELEVATIONS (Show whether DF, RT, GR, etc. 197 a[~ Check Appropriate Box To I,nd',icate Nature of N~)ti'ce, Re, None UNIT, F.~ OR LEASE NAMI~, Sunrise Lake Unit ~L NO. 10. F~ ~ P~L, OR WI~CAT Wildcat 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 15 TSN RSW S.M. 70-13 m~, or Other Data ' NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CASINO FRACTUSE TREAT MULTIPLE COMPLETE I--I nEPAIR WELL CHANO~ PLAN8 tOther) .... SUBSEQUENT REPORT OF: WATER SItUT-OFF REPAIRINO WELL FRACTURE TREATMENT &LTERINO CASINO S"OOTI~O OR ~CImZ~O A~AN~ONME~T* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) , , 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an)' proposed work. To Submit Plan for Plugging & AbandOning, on 5-22-70 foncon. as discussed with Mr. ~.L. VonderAhe 1. Cement thru perforations 11170-11260 with 460 ft.3 Cement leaving 180'± Cement inside 5~ Casing. ' 2. Cement thru perforations @ 3500-3515 with 800 ft. Cement. 3. Place Cement Plug in 5~" OD Casing ~ 0-200±'. 4. Place required monument & marker. Abandoning due to failure to discover commercial petroleum. 16. I hereby c~rtff~; t~j~,i~, fg~eg~ln~, is tr2~ and correct SIGN . .. ........ CONDITIONS O~p~hOVAL, IF A~: TITLE DRILLING SERVICES~ lNG. TITLE DATE 5-26-70 , DATE Approved~ ,,,C'Opy R~turn.ecl .~ .~J":~, J ~,~ :~,~,,' ,? ~.~.~ See [nstrucfions On Reverse Side Form P--3 REV. 9-30~ 9 CONFIDENTIAL S~brnit "Intentions" in Triplicat~ & "SUbsequent Reports" in Duplicate STATE O,F ALASKA OIL AND GAS CONSERVATIO. N COMMI'I-I"EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APP-I~ICATION 'FOR ~'ER~-~iT-~' 'for such 1. WELL WELL OTHER 2. NAME OF OPERATOR FOREST OIL CORPORATION 3. ADDRESS OF OPERATOR 425 HO" Street Anchoraqe, Alaska, 99501 4. LOCATION OF WELL 5. AP1 NLrM_F,R~CA_L, CODE~-~~'' v , A-051430 ~ None · Sunris~ Lake Unig 10. ~ ~D PO0~, OR WI~A~ ^tsurfacel031' FEL, 1341' FSL 5E~, Sec 15 TBN RBW, 18± Miles N.E. Naptowne SeM. Wildcat 11, SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) SE 15 TBN RBW, 5-M. 13. ELEVATIONS (Show whether DF, RT, GR, etc. 12. PERMIT 197 6L 70-13 14. Check Appropria~BoxToind}~ Niature of NO~tice, Re~d, orOtherD~a' NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CASINO FRACTURE TREAT ~ MULTIPLE COMPI.ETE SHOOT OR ACIDIZE ABANDONs REPAIR WELL CHANGE PLANS t Other) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMEN'T$ (Other) Cementing & Perforating (NOTE: Report results of multiple completion on Well Completion or Reeompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an)' proposed work. · 1. Place Cement thru 5" OD Drillpipe to plug 9 7/8" hole back. a. 14,430'-13,865 with 400 cu.ft. (2675½8)Class 6 Cement + 1% Pre-hydrated Gel. b. 12,200'-12,000' with 222 Gu.ft. (188 SMS) Class G Cement. 2. Run 5~" OD Casing as shown-Casing Set @ 11,977.86 RMB 0-2018 23 lbs/ft NSO LT&C 2018-6065 20 lbs/ft PllO LT&G 6065-11978 20 lbs/ft NSO LT&G 3. Cement Casing with 1100 cu.ft. (455 S½S)Class G + 20% Diacel D followed with 100 cu.ft. (85 SMS) Class G Cement 4. Perforate following Intervals with 2 Holes/ft. a. 11,698-11,758 b. 11,240-11,260 c. 11,170-11,184 5. Place permanent plug in 5~" Casing ~ 11,518. 6. Cement thru Perforations @ 11,170-11~260 with 745 Gu.ft. (650 16. I hereby cerJ;ffL tha~egoin~ is ~rue and correct TITLE DRTIITNG .qFRVTRFR~ TEll":.. DATE May ]A~ 't970 (This space for State,o!~ice/use) CONDITIONS OF APPROVAL, IF ANY: TITLE STATE OF ALASKA OIL AND GAS CONSERVATION COMMI'I-I'EE CONFIDENTAL MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WELL WELL OTHER 2. NA.MEOFOPEI:J. ATOR FOREST OIL CORPORATION 3. ADDRESS OF OPERaTOR 410 1St National Building 425 '8" 6~eet, Anchorage: Alaska 99501 4. LOCATION OF W~,LL SUBMIT IN DUPLICATE A-051430 --' ~. IF INDIA~,[ ALOJ. J.,~ OR TRIB~E-- None ..... - 8. L"N'IT,F.~:tJ, i OR LEASE N.~-,ME Sunrise Lake Unit 9. %VELL NO. 1 10. FLI~LD A_~TD POOL. OR WILDCA? 1031 FEL; 1341 FSL, SE~ Sec 15 TBN R8W S.M. 18~ Miles N.E. of Naptowne Wildcat 11. SEC., T., R., M., (BOTTOM HOLE OB.TECT~ Sec 15 TBN R8W S.M. 12. PERMIT ~O. ?0-13 13. REPORT TOTAL D~ AT ~D OF MON~, CI-LANGES IN HOLE SIZE, CASING AND CELVI~TING JOBS INCLUDING DEPTH SET AND VOLUATES USED, PERFORATIONS, TESTS A/ND ~SULTS, FISHING JO~, JU/~K ~ HO~ A_ND SIDE-TRACKED HOLE AND A_NY OTHF_.2::{. SIGNIFICANT CI-IANG~ ~ HO~ ~NDITIONS. 1. Drill 9 7/8" Hole to 14,500~. 2. Run Wireline Logs @ 13,888, 14,324 & 14,500. 3. Make (3) DST Attempts of Intervals 11~630 to 11,830 & 11,040 to 11,270. 4. Plug Hale Back with Gement placed as follows: a. 14,430-13,865 400 cu.ft. (267 SHs) Class 8 Cement + 1% Prehydrated Gel. b. 12,200-1,200 222 cu.ft. (188 S~s) Class 8 Cement. 5. Run 5~" OD Casing as shown-Casing Set ~ 11,977.86 RHB 0-2018 23 lbs./ft. N80~ LT&C 2018-6065 20 lbs./ft. PllO~, LT&O 6065-11978 20lbs./ft. NBO, LT&C 6. Cement Casing with 1100 cu.ft. (455 SHs) Glass G + 20% Diacel D followed with 100 cu.ft..(85 SHs) Class 8 Cement. 7. Waiting on Cement ~ 2400 hours, 30 Aprii.1970. 14. I hereby ee~tif~Jthat ~l~:[or,,e'g'6'"'"""~ is~4rue-~d corre~ NOIE--Report on this form is required ~or each calendar month, regardless of the status o~ operations, and must De filecl in dlJplicat~ with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. Form P--3 REV. Smbmlt "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE O'F ALASKA OIL AND GAS CONSERVATIO'N COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to driiI or to deepen Use "APP-LICATION'FO~, ~'EP~iT--' 'for such 'pi;o~osal~.) OIL F-~ GAS 0 OTHER WELL __ WELL 2. NAME OF OPERATOR FOREST OIL CORPORATION 3. ADDRESS OF OPERATOR 410 1st National Bank Building 425 "R" .q+..; llnnhn~mom; I11~_:~_ ggS0~ 4. LOCATION O'F W~L At surface 1031 ~ FEL, 1341~ FSL, 8E~ Sec 15 TSN RSW,. 18~ Miles N.C. Naptowne 13. ELEVATIONS (Show whether DF, RT, GR, etc. 1~7 aR 14. Check Appropriate Box To I,nd',i,cate N, ature of N~)tic'e, Re. NOTICE OF INTENTION TO: TEST WATER 8HUT-OFF PULL OB ALTER CASINO FRACTURE TREAT MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ABANDONi REPAIR WELL CHANGE PLANS tother) .... HI.B B. AP1 NU1VLEI~CAL CODS OKG ~ -- 50-133-20210 _~lV A-051430 , ,,, -- ?. IF IIN-DIAI~, .~LLO'i-r~E OR TRIBE NAi~ S. UNIT, FAP~ OR I~SE NAMe?-~ - S~nmimm Lake l~nit 9. ~L ~O, 10. FIELD AND POOL, OR WILDCA. T Wildcat 11. SEC., T., R., M., (BOTTOM HOL~ OBJECTIVE) Sec 15 TSN RSW 5.M. 12. PERIVLIT N'O. 70-~ )ort, or 'Other D~ta ' SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ~ .. ARANDONMEN'Ts (Other) (NOTE: Report results of multiplecompletion on Well Completion or Recompletion Report and Log form.) 15. DFSCRIBE I'ROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an}' proposed work. To verify verbal communication with Mr. a. L. Vonderahe thru Mr. W. G. Wunnicke on 25 April 1970~ for change in plans as shown below. . Existing Conditions a. 13 3/8" O.D. Casing Set @ 2553 b. 9 7/8".hole drilled to 14,500~ 2~ . Plug Hole Back a. Plug with Cement from t4,4102 to 13,8602 b. Plug with Cement from 12,200 to 12,000 Run 5~" O.D. Casing from Surface to 12,000'~ a. 0-2000~ 23 lbs/ft. N-80, LT&C b~ 2000-6050 20 lbs/ft. P-il0, LT&G c. 6050-12,000 20 lbs/ft. N-80, LT&G 16.1 hereby certify th~ th~~~ tru~ and correct (Thtll spac(e for State ol~c~use),- TITLE ~RILLING SERVICES. INC. . DATE 5 May 1970 CONDITIONS OF APPROVAL, IF ANY: TITLE See I~nstrucfions On Reverse Side Approved 'C~py Returned STATE OF ALASKA SUBMIT IN DUPLICA. TE OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS APl ~UA~ER/CAL CODE 50-133-20210 H~ TRM ~ OKG · ~. L~SE ~.s:~,,,^=os A×~MW~~' REL A-051430 ~ - ?. Ir INDIA]{, ^I.,OTTEE OR IRIB.~E N~ W~LL WZLL 0T"~R ~one ~ .... ~ 8. ~'IT,F~ OR LEASE N.~E 2. N~. OF FOREST 0IL CORPORATION ~i kDDRESS OF ~PI~/I~TOR 410' 1st National' Building 425 "8" Street,,:,.,Anchora~e.. Alaska 99501 4. LOCATION OF WTM 1031' FEL 1341' FSL SE}~ Sec 15 TBN RBW S.M. 1'8+- Miles N.E. of NaptOwne Sunrise Lake Unit 9. WELL .1 I0. FIELD A-'qD POOL. OR WILDCAT hli 1 d~.mfL.. SEC., T.. ~., ~.. (so:rro~ ~o~.~. Sec 15 TSN RSW S.M. 12, PERMIT NO. ....... 70-13 REPORT '~O'T~L dEPTH AT END 01~ MON~I, CI-IA-~4GES lINT H0~s 'SIZe. CASI~G A~ "~TING JOES I~CLUDI~G DE~TH SST ~ VOL~S USED. P~O~TIO~S. ~TS ~ ~SULTS. PISHING JO~. J~ ~ HO~ ~D SIDE-~CKED HOLE AND ~Y O~R SIGNIFIC~T ~G~ ~ HO~ ~ITIONS. 3-31-70 Drilling 9 7/8" Hole ~ 12842~ RECEIVED 14. I hereby t g d ~orrect, ................. mGW~D ~ \t.J~-,-- ~L~ Ma0a. q.er,. Alaska D~ 4-11-70 inl i iiii n nnlllm . i · m n ,1, ,,11 ....... ,i NOTE~Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless 'otherwise directed, STATE OF ALASKA svBMrr n~ DUPmC~T~ OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT O:F DRILLING AND WORKOVER OPERATIONS 1. WELL WELL OTHER 2. NAME OF OPKI{ATOR FOREST 0IL CORPORATION ADDR~SSOFOP~OR 410 1st National Building 425 "G" Street, Anchoraqe, Alaska, 99501 A-051430 7. IF INDIA]q, ALO-I rE~ OR TRIBE None 8. ITNIT,F.~ OR LEASE Sunrise Lake Uni~, g. ~.¥~:~L NO. 10. }'~ ,:~ ~r) AND POOL. OR WILDCAT 1031' FEL 1341' FSL SE~ Sec 15 T8N RBW S.M. 18± miles N.E. of Naptowne Wildcat I1, SEC., T., R., M., (BO/'I~OM HOLE Sec 15-TBN RBW S.M. 1~. PIPIT NO. 70-3 13. REPORT TOTAL DI~PTH AT END OF MONTH, CHANG~.S IN HOLE SIZE, CASING A/VD CE1VIF_2gTING JOBS INCLUDING DEPTH SET A/ND VOLU1ViES USED. PERFORATIONS, TESTS JI/N-D RESULTS, FISHING JOB~. JI/NK IAI HOLE A_ND SIDE-TRACKED HOLE ~ND ANY OTI{ER SIGNIFICAlqT CIiANG~ IN HOL]~ CONDITIONS. 2-15-70 2-17-70 2-23-70 2-24-70 2-27-70 2-28-70 17" hole ~ 360'; 26" hole ~ 337'. Ran (8) joints of 20" O.D., H-40 ST&G~ 94.00 lbs/ft casing; Set ~ 333.47 RMB. Cement thru shoe with 950 ou.ft, cement; Circulated 140~ cu.ft. Nipple up 20"-600 Hydril & pressure test casing & 8POE to 500 psi for ~ hour. 9 7/8 hole @ 2573; 17~" hole ~ 2555. Ran 13 3/8" O.D. Casing; (17) joints ~-55, 61.00 lbs/ft. ST&C on bottom~ (36) joints ~-55 54.50 lbs/ft. ST&G, (9) joints M-55~ 61.00 lbs/ft, on top. Casing Landed ~ 2553.38 RMB - R~B to GR = 16 ft. Cement thru shoe with 3050 cu.ft, cement; circulated 450 cu.ft, cement. Nipple up 12"-900 BOPE on 13 3/8 Casing. Pressure Test BPOE to 2000 psi for ~ hour. Drilling ahead ~ 3785'. 14. I hereby certi£y that the foregoing is t~e and corr~c% SmN~ .~f~//~/,~-~)~ ~Tn~DRILLING SERVICES lNG,, mAr~ ~-4-70 NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be fJlecl in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. Form REV. 9-30-69 STATE O'F AI_ASKA St~brntt "Intentions" in Triplicate & "Subsequent Reports" in Duplicate OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WILLS (Do not use this form for proposals to drill or to deepen Use "APP-LICATION 'FO~ ~'EP,~T~-~' 'for such 'pl:o~osal-~.) O,L g WELL WELL OTHER 2. NAME OF OPEI{ATOR FOREST OIL CORPORATION 3. ADDRESS OFOPEI~ATOR 410 1st National Bank Building N25 "S" Street. Ancho~agB, Alnnkn; ggSR1 ~. ~OC~IO~ O~ W~ A~ 1031~ FEL, 13Nl' FSL SE % Sec 15 TBN RBW S.M. 18± Miles N.E. of Naptowne 13. ELEVATIONS (Show whether DF, RT, Gl{, etc. I q7 RR A-051~30 i~roIm,~. ALLOTT~ OR Tt~E None 8. UNIT, FAi~NI OR LEASE NAME Sunri$e C~k~ 9. W~LL NO. 10. FIELD AND POOL, OR WILDCAT Ii. -~-C~, ~, ~'. ,-iYl., (BOTTOM I-IOI.~ OBJECTIVE) Sec 15 TBN RSW S.M. 12. PERIVIIT I~O. 72-~ Ci~ck Appropriate Box To I, nd~t~ N, ature of N~ti'ce, Re, )orr, or Other Da~a ' NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL ~Other) PULL OK ALTER CASINO ~ULTIPLE COMPLETE ABANDONS C.HANOE PLANS SUBSEQUENT REPORT OF: FRACTURE T-REATMI~NT ALTERING CASING SHOOTING OR ACIDIZING I ABANDONMENT$ (Other) (NOTE: Report results of multiple completion on Well Completion or ReeOmpletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and gh, e pertinent dates, including estimated date of starting any proposed work. According to Verbal Agreement with Mr. O. H. Gilbreth, the following change is made in plans as submitted on Application For Permit To Drill. BOPE to consist of 12"-3000 Double Rams and Bag Type Preventer with 3"-5000 choke & kill manifolds, including variable & remote/ adjustable chokes and relief lines. SIGNED Almskmn Opm. mm~.iOnSATE Mn~'nh P&~ !gTO APPROVED B~ /~/~/F ~'~~~' -~'"~ CONDITIONS OF APPROVAL, IF AN~: TITLE See Instructions On Reverse Side ApprOved Cop~' Returned Form ,~, ( .41TED STATES SUZ~,IT IN T(. ~IC*T~.' I form ,pprove~. (~ay ~) DEPARTMENT OF THE INTERIOR (Other instrueU~as on r~ I Budget Bureau ~o. 4~E14~. verse ~de) GEOLOGICAL SURVEY I :A~051~30 SUNDRY NOTICES AND REPORTS ON WELLS Iii~j;I ~ ~I~ ~0~'~~~ ~--'~-~ ~ (Do not use this form for proposals to dr~l or to d~n or plug back to a ~fferent r~ervoir. ~. a~ o~ o~.~o~ /~ 8~ ~ o~ ~~. -- FOREST OIL CORPORATION ~. ~oo~aao~ o~o~ 410 1st National Building 425 "G" Street~ Anchorage~ Alaska, 99501 ~. ~oe,~o~ om w~ (~e~tt ~oe~ttom e~earl~ aa& tm aeeot~aaee ~tt~ aa~ 8~te teqetremeata.· 8~ also apace ~T below.) ~t s~aee 10~1 FEL 1~41' FSL Sec 15 TBN RBW S.M. 18~ Miles N.E. of Naptowne 14. 15. 17. Pelt~ilT NO. I 15. ELEVATIONS (Show whether DF, ET, GE, e$~.) .~1~, STATE AP1 50-13~-20210I 197 Ch~k Appropriate Box To Indicate Nature of Notice, Repod, or ~~ata I I~l , ~ ~ar% urllllng upera%lon8 ~ v~scgmm x,~o~os~v oa co~Lm~v o~mgSmlOSS (Clearly state all pertinent details, and give pertine~'t ~ates,~}~g es~a~d~t~ of s~rting any propo~e~ork._ ~ well is di~tion~y drill~, give subs~e l~ons and measured and true ~ertie~~' ~ for ~11 ~a~and ~ones ~rti- Well Spudded on 12 February 1970 18. I hereby ceftin'at th '0 ~~. ts~~ eo~eet Alaska Operations TITLE *See Instructions on Revere Side (This space for Federal or State o~ce use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: DSI 277-0183 DRILLING SERVICES, INC. 4729 KENT STREET ANCHORAGE, AI..ASKA 99503 KENNETH L. WILLITS Mr. Homer L. BURRELL Chairman Alaska Oil and Gas Conservation Committee Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska~ 99501 Dear Mr. Burrell: Re: Forest Oil Corp. Sunrise Lake No. t Drilling Permit Application Enclosed with this letter is the As-Built Surveyor's Plat of the subject well. This is submitted as a supplement to the Drilling Permit. I trust this will meet your location requirements. 8incerely~ ~enneth L. Willits President ~LW:ww Encl: ~-t-~ (3) Copies Lindsey PlatT Sunrise Lake No. 1 cc: Mr. H. E. Snider~ enclosures sent separate Mr. D. F. Dom w/encl. 18 19 $0 I I I0 L I I 22 i SUNRIS,E LAKE No. I Lot. 60° 46 51.21" I Long. 150039'07.55" 103~' Y = 2,477,933 ~T~ X: 383,453 ELEV. TOP PAD AT RAT HOLE"1~7'-- 1 I I I 23 24 I I I i I f 28 I I 26 25 CERTIFICATE OF SURVEYOR SCALE; I"= IMILE I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision, and that all dimensions and other details are correct. mi TSN. Date SURVEYOR SUNRISE LAKE No. 1 Located in SE I/4 of Protracted Sec. 15 Sew~rd Meridian Surveyed for FOREST OIL CORP.- Surveyed by F M. LINDSEY 8[ ASSOC. LAND & HYDROGRAPHIC SURVEYORS ;3502West Northern Ligh'ts Boulevard Box 4-081 Anchorage Alaska DSI' 277-0183 DRILLI G SEL ¥1CES, 4729 KENT STREET ANCHORAGE, ALASKA 99503 KENNETH ~.. WILLITS Mr. William J. LiNTON Regional Oil & Gas Suoervisor Conservation Division United States Geological Survey 214 Skyline Building 508 Second Avenue Anchorage, Alaska, 99501 January 14, 1970 TRM FILE Re: ~orest,Oil Oorp. Sunrise Lake No. 1 Drilling Permit AppliCation Dear Mr. Linton- This letter confirms conversations with you and Mr. Wunnicke on January 12 & 13, 1970, concerning supplemental information and revision of the referenced Drilling Permit Application. The' geologic markers anticipated during the drilling of the subject well, are given below. The present 7" O.D. casing program, i~cluding additional bursting capacity, is also shown. Geologic Marker Estimated Depths Beluga Formation Hemlock Conglomerate 6000'-7500' 12,500-13,000 7" O.D. Casing Program Interval Weight, lbs./ft. & Grade _. 0-1700' 29;00 NsO 1700'-7100' 2~o.00 7100'-10,250' 26.00 Pi~O 10,250'-13,500' 29.00 PIiO i trust this will complete the Drilling Permit Application. Your assistance with this is appreciated. Alaska O&G Commission H. E. Snider, Forest 0~1 Corp. D. F. Dorn, Forest Oil Corp. - Sincerely, · Kenneth L. Willits President - Denver Anchorage ~I¥1~ION OF OIL AND AHCHORAGE In ~ ~ ~t ~ ~ ~: ~ ~ttmws present, lOorm P~I REV. STATE OF ALASKA (OSher i~struct .i~ reverse side) AP! 50-133-20210 OIL AND GAS CONSERVATIO'N ,COMMITTEE APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK DRILL iX] DEEPEN FI PLUG BACK FI b. TYPJ OF WmLL Oil, 0 GA8 0 81NGLJ 0 WILl, WELL OTHI[R ZON~: ZONE NAME OF OPIKIiATOR FOREST OIL CORPORATION :~. ^DDSESSO~OPr. r~Oa 410 1st National Building 425 "S" Street, Anchoraqe, Alaska 99501 4. LOCATION OF WELL At surface Center SEC, Sec 15, TGN RGW, S.M. At proposed prod. zone Same 13. DISTANCE IN MILES AND DIRECTION FAOM NEAREST TOWN OR POST OFFICe' 18± miles N, E. of Napto. wne 14. BOND INFORMATION : Hartford Accident & BLM Ref 3126.1 Nation- TYPE W 1 [~ e Surety and/or No. Inaamnity Co. 15. DISTANCE FROM PROPOSED' ilS. NO. OF ACRF~ IN LEASE LOCATION TO NEAREST iAlso to nearest drig, unit, if any) 1320 ' 12/+0 18. DISTANCE FROM PROPOSED LOCATION* 19. PROPOSED DEPTH 6. I.~F.d%SE DI~$1GNATION Dd~FD SIgRIAL NO. A-0514~0 ~. ,r INDI~, A_nUO~E oa ~r N~ Nnn~ 8. UNIT, P~M OR LKAS~ NAM~ ~,nm~mm [aka ~nit ~. WELL NO. ] 10. mELD AND POOL, OR WILDCAT hl~ ] n. s~c., t., m, M., ~BO~O~ HOLE O~ECTIVE) 12. Henai Borrough TO TI-IlS WELL TO NEAREST WELL DRILLING, COMPLETED. OR APPLIED FOR. FT. Nnnm 21. ELEVATIONS IShow whether DF, RT, C-R, etc.; 20. ROTARY OR CABLE '[ ~3()LS 2~. APPROX. D~[TE WORK WI J.l, START* 175' GR l Febr!,arV !97B 23. PROPOSED CASING AND CEMENTING ~ROGRAM ,L , SIZE OF HOLE SIZE ,O,,F CASING .WEIGHT PER FOOT GIIAI:~ [] $~I~ING.DEPTH QUANTITY OF CEMENT 36" 30" OD 157.53 AP1 S 30' 60 260. cu, ft. fr/(~ /~ ~ . 26" 20" OD 94.0.0 _ H-40 300' 900 q 7/a,, g,, nn 23.fla-Pq tis Plla_N;~n ~ man, 1350 , ,,J ,, ,, , MUD PROGRAM BOPE PROGRAM Freshwater-ael-Lignosulfonate 0-2500~ '9.0-10.0 ppg 2500~-1~,500' 9.5-11.0 ppg 0-30.0.~ None 300'-'2508~ 20"-2000 psi 2500'-10,500' 12"-3000 psi !0,500"~-1},500' 10"-5000 psi 12,400-13,500~ Objective Interval estimated Formation Evaluation: Mud Logging, Wireline Louuinu . cu~zn0soSPo~:~r~~e..qp~s~ ar~~e~ p,u, ~ck .,v. ~.~ present productive ~d IN ~ ~A~ D~BE ~O~ : on zone (This space for S~te offia u~) CONDI~ONS OF ~P~V~, I~ A~: {SAMPL~ AND CORE CHIPS R~U~ ~ ~U~S: See Transmittal Lelie~ A.P.I. ~CA.L CODE ~5-~> -- / 3.3 - ;zo [] YES [] NO DIRECTIONAL SURVEY RE~ [] YES ]~ NO January 14, 1970 n.~ Ja'nuary, 14,.,, 1970 1. Is well to be located in a defined pool .... · ............ 2, !~,;: statewide rules apply ................... . ........ ~ ................................................................................ e ~s a registered survey' pl~t ~:~:~.t~ched ........... ~ 4. ~:~ well located proixi~r distance from property line ........... x4~ 5, Is well located proper distance from other wells ............ ~ 6. Is sufficient undedicated acreage available in this pool ........ ~ 7. Is well to be deviated ......................... ~ Be Is operator the only affected party ................... ~_~ ..... 9. Can permit be approved before ten-day wait ............... ~ 10, [Joes operator have a bond in force .... .; .............. ll. Is conductor string provided ....... , .............. Is enough cement used to circulate on conductor and surface ...... ~:~l cement tie in surface an(~ intermediate or productic:i strings 14. Will cement cover all possible productive horizons .......... 15. Will surface casing cover all fresh water zones ~6. ~li surface csg. internal burst equal ~5 psi/ft, 17. Will all casing give adequate safety in collapse and tension ......