Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout181-066 WELL HISTORY FILE COVER PAGE XHVZS This page identifies oversize material and digital information available for this individual Well History file and weather or not it is available in the LaserFiche file. Please insure that it remains as the first page in this file. Iff I (J {; þWell History File # Digital Data 0 CD's - # - 0 DVD's - # - 0 Diskettes - # - Added to LaserFiche File 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No Oversized Material Added to LaserFiche File 0 Maps # 0 Mud Logs # - 0 Other # - 0 Yes 0 No 0 Yes 0 No 0 Yes 0 No General Notes or Comments about this file. If any ofthe information listed above is not available in the LaserFiche file you may contact the Alaska Oil & Gas Conservation Commission to request copies. Please call Robin Deason at (907) 793-1225 if you have any questions or information requests regarding this file. IEl-o&& Winton, Regarding the 17-07 Pre rig P&A cement, or lack off in this case, please review our e-mail discussion pertaining to the issues with the well. We were aware of potential tubing problems. The wells crew made every effort to drift to the top of sandback plug. The tubing was parted and it was impossible to pass through cleanly. They ended up sticking a wireline tool and losing it in the hole at 9,447', which corresponds to the depth of a tubing patch. We elected to move forward with plan 'B' and fully cement our 7" drilling liner up to the TOL, which we were successful in doing. Please call or e-mail with any requests for further documentation. best regards, Dave Wesley, Jr. Operations Drilling GPB Rotary Drilling 564-5153 office 440-8631 cell 564-4040 fax Engineer -----Original Message----- From: winton Aubert [mailto:winton aubert@admin.state.ak.us] Sent: Monday, December 08, 2003 3~42-PM- - ------ To: Wesley, Dave E Subject: Re: 17-07 P&A Dave, The cement requirement can be satisfied by cementing a subsequent sidetrack liner back into the previous casing, above the retainer. No other cement plug would then be necessary. If the sidetrack liner is uncemented, you should place cement on top of the sand plug. Winton Aubert AOGCC 793-1231 Wesley, Dave E wrote: Mr. Aubert, Well 17-07 is currently being reviewed as a possible sidetrack candidate. A 50 bbl sand pill was pumped into the well in February of 2003 to isolate -60' of open perfs. It apparently held pressure up to 1,500 psi. I'm presently trying to verify this. There is a tubing obstruction, possibly parted tubing, at 8,507' md. Looking forward, I intend to apply for Approval to cut and pull tubing above this obstruction. I plan to set an EZSV at the tubing stump, once the well has been decompleted. My question regarding P&A is whether or not this sand back is sufficient; will we need to place a cement cap on top of the sand plug, or will we need to wash up the sand and completely cover the perfs with cement. thanks Dave Wesley, Jr. operations Drilling GPB Rotary Drilling 564-5153 office 440-8631 cell 564-4040 fax Engineer STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG No. of Completions 1a. Well Status: 0 Oil 0 Gas 0 Plugged IBI Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2242' SNL, 930' EWL, SEC. 22, T10N, R15E, UM Top of Productive Horizon: 1412' NSL, 1788' EWL, SEC. 15, T10N, R15E, UM Total Depth: "Ð~ 1648' NSL, 1-168' EWL, SEC. 15, T10N, R15E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 709176 y- 5928401 Zone- ASP4 TPI: x- 709925 y- 5932077 Zone- ASP4 Total Depth: x- 710031 y- 5932316 Zone- ASP4 18. Directional Survey 0 Yes IBI No Zero Other 5. Date Comp., Susp., or Aband. 2/6/2004 6. D~te Spudded 05117/1981 7. Date T.D. Reached 06/04/1981 8. KB Elevation (ft): KBE = 71' 9. Plug Back Depth (MD+ TVD) 9880 + 8664 10. Total Depth (MD+TVD) 10790 + 9515 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 1b. Well Class: IBI Development 0 Exploratory 0 Stratigraphic Test 0 Service 12. Permit to Drill Number 181-066 303-393 13. API Number 50- 029-20596-00-00 14. Well Name and Number: 17-07 15. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028331 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) 22. i (GASlflli¡: , '~'$IZÉ: : 20" 13-3/8" 9-5/8" 21. Logs Run: OIL 1 Sonic 1 GR, FDC 1 CNL / GR, CNL / GR CASING, LINER AND CEMENTING RECORD : '\lVT:-~€{) ~:'~;-~i~:~1¡';~::=~g~~:=:~ ..n, ~r1;;j'~tê~~!~Re~ :;",.,.: . 94# H-40 Surface 80' Surface 80' 32" 232 sx Arcticset II 72# N-80 Surface 2687' Surface 2687' 17-1/2" 3000 sx Fondu, 850 sx PF II 47# L-80 / SOO-95 Surface 9962' Surface 8739' 12-1/4" 500 sx Class 'G' 29# L-80 9657' 10790' 8462' 9515' 8-1/2" 420 sx Class 'G' 7" 23. Perforations open to Production (MD + TVD of To,e and Bottom Interval, Size and Number; if none, state' none"): None MD TVD MD 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED ....... Press. 24-HoUR RATE"'" ',}íÙSINGREGORÓ, ',' SIZE DEPTH SET (MD) 5-1/2", 17#, L-80 8535' - 9580' 4-1/2", 12.6#, N-80 9644' '~!>è'~;::;{~pJ~~~~9ß~~Þ~:t$~~: ~ç.;, , ,,', " DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 7488' Set EZ Drill Plug ;- 7475' Set Whipstock; 2M:;" TVD PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-Bel GAs-McF WATER-BBl CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". ~BfL APR 51""100,RECEIVED None nIIiIUIIIU 0 RIG I N A L APR - 1 2004 Aláska Oil & Gas Cons. Commission Anchorage OIL-Bel 27. Form 10-407 Revised 12/2003 GAs-McF WATER-BBl CONTINUED ON REVERSE SIDE , d~t#ÔÙrìtr ,PULLeD. PACKER SET (MD) 9567' cJr. ~t\fIt CHOKE SIZE I GAS-Oil RATIO Oil GRAVITY-API (CORR) 'vzV' 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 10021' 8793' None Shublik 10051' 8820' Top Sadlerochit 10133' 8897' OIW Contact 10341' 9092' Base Sadlerochit 10694' 9425' RECEIVED APR - 1 2004 Aláska Oil & 8as Cons. Commission Anchorage 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~~ ~ Title Technical Assistant Date 03. a, ..Ql.¡ 17-07 181-066 303-393 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Dave Wesley, 564-5153 Permit No.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection. Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEMS: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: AttaChed supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Well: Field: API: Permit: 17-07A Prudhoe Bay Unit 50-029-20596-01-00 204-011 Accept: Spud: Release: 02/03/04 02/07/04 02/20104 Nabors 7ES PRE-RIG WORK 12/23/03 TIIIO = SSV/51 010+, TEMP = SI. OA FL FOR FB (PRE-MITOA). OA FL @ 30' (2 BBLS). 12/24/03 T/I/O=200/25010. MITOA TO 2000 PSI PASSED. (PRE RIG ST DIAGNOSTICS). PRESSURED OA TO 2000 PSI WITH 4.1 BBLS OF CRUDE. OA LOST 100 PSI IN FIRST 15 MINUTES AND 30 PSI IN SECOND 15 MINUTES FOR A TOTAL OF 130 PSI IN 30 MINUTES. BLED OA DOWN. FINAL WHP'S=200/25010. 01/09/04 TIIIO = SHUT IN/300/O PPPOT-IC = GOOD TEST AT 3200 PSI. PPPOT-T = GOOD TEST AT 5000 PSI. LDSIPOT = ALL GOOD AT 550 FT -LBS. 01/29/04 DRIFT TUBING WI 1 112" TOOL STRING, 2.20 CENTRALIZER. PARTED WIRE @ ROPE SOCKET @ 9447' SLMD. DRIFT TUBING WI 41/2" CENTRALIZER TO 7800' SLMD. PICTURE OF LOST TIS WITH WELLS GROUP. WELL LEFT SII @ DEPARTURE. 01/30/04 DRIFT WI 4.50 CENT. SAT DOWN @ 8502 SLM. WELL LEFT SII @ DEPARTURE. CHEMICAL CUT TUBING AT MID JOINT - CUT DEPTH = 8472 FT. STRING SHOT AREA OF CUT AND ANCHORS (8460.5 - 8473.5 FT). STRING SHOT HAD 2 STRANDS AT 80G EACH. TIED INTO WELL SCHEMATIC ITUBING TALLY AS PROVIDED BY CLIENT. CUTTER = 4 7/16" HEAD, 2 TUBES @ 48" X 2" EACH. EACH TUBE HAD A CENTRALIZER OVER IT. BOTTOM NOSE CENTRALIZER ALSO INSTALLED. LEFT WELL SHUT IN. 01/31/04 TIO=0/60010. (PRE-RWO) CIRC-OUT WELLBORE WI 734 BBLS 1% KCL WATER. FREEZE PROTECT TXIA WI 150 BBLS DIESEL. FREEZE PROTECT FLOWLINE WI 10 BBLS DIESEL (TWINNED WI 17-16). FINAL WHP'S=OIOIO. BP EXPLORATION Operations Summary Report Page 1 .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 17-07 17-07 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Start: 1/31/2004 Rig Release: 2/20/2004 Rig Number: Spud Date: 5/17/1981 End: 2/20/2004 Date From - To Hours Task Code NPT Phase Description of Operations' 2/112004 04:00 - 13:00 9.00 MOB P PRE PJSM, RID, Move pits and Shop in order to move out with Sub. Move Sub Off Z-30A. RID top drive, bridle up. Lay Down Derrick. 13:00 - 00:00 11.00 MOB P PRE PJSM with Rig Crew, Security, Peak, Tool Services and all involved with move. Move Sub off Z Pad down Access Rd. to Spine Rd. . Move East on Spine Rd. toward Kuparuk River Bridges. 2/2/2004 00:00 - 16:00 16.00 MOB P PRE Continue Moving Sub. Arrived OS 17 @ No Problems. 16:00 - 00:00 8.00 RIGU P PRE Raised Derrick, Pinned Same. Un-bridle Blocks, Hook up Top Drive, Hang Bridle Line, Connect Lines. Spot Mats & set Herculite. Moved Rig onto Mats, Spotted and Leveled Rig Over 17-Q7A. Bermed Rig. 2/3/2004 00:00 - 03:00 3.00 RIGU P PRE Center and level Rig over 17-07. Spot Pit Complex & level same. Hook up all lines. Prepared to take on seawater. 03:00 - 04:30 1.50 WHSUR P DECOMP ACCEPT RIG @ 03:00 HRS 213/2004. Take on Seawater. RlU Lines to Tubing and 5 1/2" X 9 5/8" Annulus to Choke Manifold in Preparation to displace diesel from wellbore. Checked 5 112" Tubing X 9 5/8" Annulus - on slight vacuum. Bled off trapped 500 psi in control line. 04:30 - 05:45 1.25 WHSUR P DECOMP Pressure Test Lines & Tree to 3500 psi. RlU DSM Lubricator & pull BPV. Tubing also on slight Vacuum. 05:45 -10:00 4.25 WHSUR N RREP DECOMP Change out Drag Chain in Pits. 10:00 -15:00 5.00 CLEAN P DECOMP Pump 104 Bbls heated Seawater down lA, dispalcing Diesel out of Tubing. Pumped 30 Bbls before returns. When Clean Returns: Pump Seawater down Tubing taking Diesel returns from Annulus until clean. 15:00 - 16:00 1.00 WHSUR P DECOMP Monitor Well- Static. RlU DSM Lubricator & Set BPV. Test from below to 1000 psi. 16:00 - 18:00 2.00 WHSUR P DECOMP N/D Tree & Adapter Flange & remove from Cellar. FMC Hand set Blanking Plug in Tubing Hanger. 18:00 - 21:00 3.00 BOPSUFP DECOMP N/U BOPE, Riser & Secure Turnbuckles 21 :00 - 00:00 3.00 BOPSUR.P DECOMP Test Blind Rams to 250 psi -Low & 3500 psi -High. P/U FMC Plug pulling tool, MIU to Jt 5" DP. Run in and engage Blanking Plug & Pull Same. P/U 5 1f2 " Landing Jt wI LH Acme Thread Run in and Screw into Tubing Hanger. Fill Stack & Choke Manifold - Resume Testing. 2/4/2004 00:00 - 02:00 2.00 BOPSURP DECOMP Continue to Test BOPE. High Test on Lower failed. 02:00 - 03:00 1.00 BOPSURN SFAL DECOMP Found Seal on Test Jt Failed. Pull test Jt. C/O seal. Run Back in and screw into Hanger. 03:00 - 04:30 1.50 BOPSUR P DECOMP Complete Testing BOPE 250 psi. Low, 3500 psi High all tests 5 minutes. Witness of test waived by John Spaulding, AOGCC. 04:30 - 05:00 0.50 BOPSURP DECOMP Disengage Test Jt from Tubing Hanger. Pull & UD. RID testing Equipment. 05:00 - 06:00 1.00 WHSUR P DECOMP PJSM. RlU 7" Shooting Nipple wI Bowen Connector. RlU DSM Lubricator & Pull BPV. RID DSM. 06:00 - 07:30 1.50 FISH P DECOMP PJSM. M/U Baker Spear Assy and Spear into Tubing. Engage Spear 12' below Hanger. B.O.LD.S. Pulled 160K to Free Tubing = Calculate bouyed Wt + T/D & Blocks. 07:30 - 09:00 1.50 PULL P DECOMP Pull Hanger through BOP to Floor. Fill Hole with 47 Bbls. Monitor Well. (Approx. 16 BPH Losses) 09:00 - 09:30 0.50 PULL P DECOMP Back Out & UD Spear Assy. & Tubing Hanger. 09:30 -10:30 1.00 PULL P DECOMP Circulate Bottoms Up wI Seawater: 379 Bbls @ 6 BPM & 260 Printed 2/2312004 11.14.46 AM Page 2 ... BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 17-07 17 -07 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES Date From - To Hours .Task Code NPT Phase 2/4/2004 09:30 - 10:30 1.00 PULL P DECOMP 10:30 - 15:00 4.50 PULL P DECOMP 15:00 -15:30 0.50 PULL P DECOMP 15:30 - 21:00 5.50 PULL P DECOMP 21 :00 - 22:00 1.00 PULL N SFAL DECOMP 22:00 - 23:30 1.50 PULL P DECOMP 23:30 - 00:00 0.50 CLEAN P DECOMP 2/5/2004 00:00 - 01 :00 1.00 CLEAN P DECOMP 01:00 - 01:30 0.50 CLEAN P DECOMP 01 :30 - 02:00 0.50 CLEAN P DECOMP 02:00 - 05:00 3.00 CLEAN P DECOMP 05:00 - 12:00 7.00 CLEAN P DECOMP 12:00 - 18:00 6.00 CLEAN P DECOMP 18:00-21:30 3.50 CLEAN P DECOMP 21:30 - 23:00 1.50 CLEAN P DECOMP 23:00 - 00:00 1.00 PXA P DECOMP 2/612004 00:00 - 02:30 2.50 PXA P DECOMP 02:30 - 03:30 1.00 PXA P DECOMP 03:30 - 07:30 4.00 STWHIP P WEXIT 07:30 - 12:00 4.50 STWHIP P WEXIT 12:00 - 13:00 1.00 STWHIP P WEXIT Start: 1/31/2004 Rig Release: 2/20/2004 Rig Number: Spud Date: 5/17/1981 End: 2/20/2004 Description of Operations psi. Losses 6 BPH while Circulating. Rig up Camco Spooling Unit. PJSM with All hands involved POH w/5 1/2" Tubing, Spooling Dual Control Line to Camco Ball-O Nipple. RID Camco Spooling Unit & Off Load from Floor. Continue POH, LID 51/2" Tubing & Jewelry. Setting Plate on Top of YC Elevators Broke. Repair BJ, YC Elevators. Complete POH & LID 5 1/2 Tubing & Jewelry. Total 198 Jts Layed down. Chemical Cut only partial on Jt # 197. Jt # 198 pulled out of Collar. Jts 194 through 198 had heavy corrosion damage. STUB is Collar @ 8535' Total Recovery: 198 Jts, 17#,L-80, AB Mod. Tubing 14 ea. Camco GLM's ww/1 0' Pups above & Below 11 ea Camco Ball-O-Nipple w/1 0' Pups Above & Below I 2 Lengths of 2178' - Monel 114" control Line I 1 ea. 135/8" X 5 112" FMC K-Monel Weld Neck Tubing Hanger 125 ea. Control line Clamps I 4 ea SS Bands. RID Tubing Equipment & load Out. Load Pipe Shed With 61/4" DC's & 5" HWDP, Clear & Clean Rig Floor. Run Wear Bushing. Bring Baker cIa BHA tools to Floor. PIU & MIU cIa BHA: 8 112" Junk Mill, BS, 8 1/2" String Mill, Bumper Sub, Jar, 9 - 6 1/4" DC's, 21 Jts 5" HWDP. RIH to 7,595', PIU 5" DP 1 X 1 From Shed. Close Annular Preventer. Have little Red pump 135 Bbls Hot Diesel down Annulus. Chase with 240 bbls Hot seawater with Rig pumps @ 6 BPM I 400 psi. to complete Annular Displacement. Then pump down Drill Pipe, Circulating out Diesel. Keep pumping Hot Seawater until Clean. NOTE: During operation: maintained back pressure with choke to keep hydrostatic pressure same throughout Circulation. Rotated Rig Crew Hands on Choke, with pumping schedule, giving them practical experience in a simulated Well Kill. POH wI 5" DP. Stand back DC's & HWDP. LID cIa Tools. Well took 27 bbls over Displacement. Hold PJSM wI Rig Crew, SWS E-line & Halliburton Tool Hand. RlU SWS. Tour Change - PJSM wI New Crew. MIU EZ Drill Bridge Plug on CCL & RIH. Correlate to 9 5/8" Collars. Collars @ 7458' & 7498'. Set EZ Drill @ 7488'. POH w/E-line & RID SWS. RlU & Test 9 5/8" Casing & BP to 3500 psi. Chart for 30 minutes. Test OK. Blow down all lines. PJSM wI crew, Baker & Anadrill DD & MWD. PIU & MIU Whipstock I Casing Milling Assy, Orient, RIH, & Surface test MWD. RIH to 7,451'. M I U Top Drive, Engaged Pumps, Established Parameters: Pump Rate 500 gpm, 1500 psi, String Weight Up 195,000#, String Weight Down 175,000#. Oriented Whipstock 2 deg Right PrInted 2/2312004 1114,46AM , " Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date Page 3 .. BP EXPLORATION Operations Summary Report 17 -07 17 -07 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 7ES 2/6/2004 12:00 -13:00 From - To Hours WEXIT 13:00 -14:30 14:30 - 21 :30 21 :30 - 23:00 23:00 - 23:30 Task Code NPT Phase 1.00 STWHIP P / 1.5~ STWHIP P 7.00 ~TWHIP P WEXIT WEXIT 1.50 STWHIP P WEXIT 0.50 EVAL WEXIT P 23:30 - 00:00 0.50 EVAL P WEXIT 217/2004 00:00 - 04:00 4.00 STWHIP P WEXIT 04:00 - 06:30 2.50 STWHIP P WEXIT 06:30 - 08:00 1.50 BOPSUR P WEXIT 08:00 - 11 :00 3.00 STWHIP P WEXIT 11:00 -15:30 4.50 STWHIP P WEXIT 15:30 - 16:30 1.00 STWHIP P WEXIT 16:30 - 17:30 1.00 STWHIP P WEXIT 17:30 - 23:30 6.00 DRILL P INT1 Start: 1/31/2004 Rig Release: 2/20/2004 Rig Number: Spud Date: 5/17/1981 End: 2/20/2004 Description of Operations and RIH very slowly, Tagged Up at 7,499' Drill Pipe Measurement. Set Down wi 25,000# and Set Whipstock Trip Anchor. Picked Up wi 10,000# Overpull to Confirm Anchor Set. Slacked Off and Stacked Out wi 40,000# and Sheared off of Whipstock. Pulled up and Confirmed Whipstock was Set and Sheared. Displace Wellbore with 9.7 LSND Mud. Staged pumps up to 500 GPM 11500 psi. Milled Window from 7,475' to 7,503'. WOM 10,000# - 20,000#, RPM 70 - 100, Torque Off Bottom 4500 ft Ilbs, Torque On Bottom 6,500 to 8,500 ft Ilbs, Pump Rate 500 gpm, 1,950 psi. Pumped 2, 30 bbl Hi-Vis Sweeps wi Super Sweep Material. String Weight Up 195,000#, String Weight Down 170,000#, String Weight Rotating 175,000#. Note: Top of Window 7,475'1 Bottom of Window 7,491'. Drilled New Hole to 7,503'. Reamed out Window & Pumped and Circulated Around 30 bbl Hi-Vis Sweep wi Super Sweep Material. Pump Rate 500 gpm, 1,950 psi. Circulated until Returns Over Shakers were Clean. Note: Recovered 187# of Metal Cuttings. RlU & Perform FIT - 1060 psi with 9.7 ppg mud @ TVD of 6,772' WOULD have given us a 12.7 ppg FIT. The Formation Broke Down @ 45 strokes 1021 psi. The Plot of pressures and strokes shows the Formation starting to take fluid @ 958 psi. This gives us a Leak Off of 12.42 EMW. Pump dry Job, RID Lines, Blow Down. POH 5" DP. Stand Back 5" HWDP. UD Whipstock BHA Pull Wear Bushing, MIU Jetting Tool on Stand of 5" DP. Function & Clean Out BOP. Install Wear bushing. Held PJSM. M I U 8-1/2" Directional BHA: 8-1/2" Hughes HMC605 PDC Bit Ser#71 02718 dressed w/5 x 15 Jets - 6-3/4" 5.0 Stg XP Mud Motor w/1.15 deg Bend - 8-1/2" Stabilizer- CDR Assembly - MWD Assembly - 8-1/2" Stabilizer - 3 x 6-3/4" Flex Collars - XO - Jars - 20 Jts 5" HWDP - 8.112" Ghost Reamer - XO. Total BHA Length: 818.79'. Oriented Motor to MWD. Pulsed Tested MWD, OK. RIH, Picking Up & Rabbiting, 99 Jts of 4" DP from Shed. Change Out Elevators and P/U 15 Jts of 5" DP. Continue RIH wi Stands to 7,436'. M I U Top Drive, Established Parameters: String Weight Up 170,000#, String Weight Down 160,000#, Pump Rate 560 gpm, 2,150 psi, ECD 10.4 ppg. Oriented Tools High Side, Shut Down Pumps, RIH Through Window. Re-Engaged Pumps, Washed Down as Precaution from 7,496' to 7,503', Pump Rate 521 gpm, 1,960 psi. Drilled 8-1/2" Directional Hole by Rotating and Slidin 7,503' to 7,759', WOB Slidin 1 , WOB Rotating 10 " RPM 60 to 100, Motor RPM 154, ue Off Bottom 6,000 ft Ilbs - On Bottom 8,000 ft Ilbs, Pump Rate 560 gpm, SPP Off Bottom 2,100 psi, On Bottom 2,450 psi. String Weight Up 175,000#, String Weight Down PrInted 2/2312004 11 14 46 AM bp j ( To: Winton Aubert - AOGCC Date: December 22, 2003 From: Dave Wesley, Jr. - BPXA GPB Rotary Drilling Subject: 17-07 Application for Sundry Approval - P&A for Sidetrack Operations Reference: API # 50-029-20596-00 Approval is requested for the proposed P&A of PBU well 17-07. DS 17-07 was drilled and completed 6/81 and was perfed in 80' of Zone 4. Initial production was 3,700 bopd, at solution GOR. An acid job 3/88 increased oil production 900 bopd. Water production began 8-88, and CaCO3 scale deposition caused production to decline from 4,500 bopd to 2,200 bopd. A mud acid stimulation 5/89 increased production by 1,100 bopd. In 4/90, the Sag and Zone 4 was frac'd with 163k Ibs. By 1/93, production had dropped to 600 bopd, and another acid job was tried, but production remained unchanged. A 112' jointed patch was set over GlM #10 in 1/95, and the well was secured with a sand plug 11/95 for l TSI due to low production. The well was BOl in late 1999 at about 200 bopd, and produced at that rate until failing MIT's caused the well to be secured with a sand plug again. A tubing caliper shows 16 joints of split tubing above 8,762', and possible parted tubing at 8,507'. /' The 17-07A sidetrack is currently scheduled for Nabors rig 7ES, beginning around February 01, 2004, after the completion of the Z-30A sidetrack. The pre-rig work for this sidetrack is planned to begin as soon as the attached Application for Sundry is approved. Scope Notify the field AOGCC representative with intent to plug and abandon Pre-Ria Work: 1. R/U and RIH with coil tubing to plug and abandon the well bore above the sand plug-back. Confirm ". tag at top of sand at -9,880' md. Plug and abandon, with 15.8ppg class 'G' cement. Use adequate .,.- cement volume to fill the 7" liner above the sa trg, plus -100 feet of 5 Y2" X 4 Y2" tubing tail. The estimated minimum cement volume required i 12g.øls. ,- 2. R/U slick-line. Drift the 5 Y2" tubing to 7,800' ..' 6 confirm clear to the required cut depth of 7,600'md. 3. Fluid-pack the 5 Y2" tubing and 9 5/8" x 5 Y2" annulus to surface. Test to 3,000 psi. .,,-'" 4. R/U E-line. RIH with the appropriate chemical cutter and cut the 5 Y2" tubing at -7,600' md. 5. Displace the well to clean seawater by circulating down the tubing through the tubing cut. Continue to circulate until clean seawater returns to surface. Freeze protect to -2,200' MD with diesel. 6. Test the 9 5/8" pack-off and tubing hanger seals to 5,OOOpsi for 30 minutes. Function all lock Down Screws, repair or replace as needed. 7. Bleed casing and annulus pressures to zero. 8. Set a BPV. Secure the well. level the pad as necessary. '. " 'r~s ID,. '-I-O~ offY\J\LGL(. Ria Operations: 1. MI I RU Nabors rig 7ES 2. Circulate out diesel freeze protection and displace the well to seawater. Set BPV with blanking plug. 3. Nipple down tree. Nipple up and test BOPE to 3,500psi. 4. R/U. Pull 5Y2" tubing from the cut at -7,600' MD and above. 5. R/U E-line. M/U 8.5" gauge ring I junk basket. RIH and tag tubing stump. POOH. 6. RIH with HES EZSV on E-line. Set bridge plug as required to avoid cutting casing collar and place top of whipstock at -7,450'. POOH. RID E-line. . J 17-07 Application for Sundry "',',,"", rr h\ I~¡I~\ [~,' \,r,',i,J J ~ t.n 6~ ~ 20 OC1l- ~\\'¡Ii'"\\tJ~ 1'ì.'J@;.;.lb" f'W,lj fJJJ \lJI (' ( 7. Pressure-test the 95/8" casing to 3,500psi for 30 minutes. Record test. 8. P/U and RIH with 95/8" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired, and set on bridge plug. Shear off of whip stock. 9. Displace the well to 11.2ppg LSND based milling fluid. Completely displace the well prior to beginning milling operations. 10. Mill window in 9 5/8" casing at :t 7,450' MD, plus approximately 20' beyond middle of window. Circulate well bore clean. 11. Pull up into 9 5/8" casing and conduct an FIT to 12.7 ppg EMW. POOH. 12. M/U 8 Y2" Dir/GR/PWD assembly. RIH, kick off and drill the 8 1/2" intermediate section to the top of the Sag River, per directional proposal. Circulate well clean, short trip to window. POOH. 13. Run and cement a 7",26.0#, L-80 intermediate drilling liner. 14. M/U 6 1/8" Dir/GR/Res assembly. RIH to the landing collar. 15. Test the 9 5/8" casing X 7" liner to 3,500psi for 30 minutes. Record the test. 16. Drill out the 7" liner float equipment and cement to the shoe. 17. Displace the well to 8.5ppg Flo-Pro drilling fluid. 18. Drill out the 7" shoe. DO NOT drill new formation with this assembly. POOH for build assembly. 19. M/U 6 1/8" Dir/GR/Res/ABI build assembly. RIH, drill 20' new formation, pull up into the shoe and conduct an FIT to 10.0ppg EMW. Drill ahead to end of high dogleg section. POOH. 20. M/U steer-able assembly, RIH, drill to TD of approximately 12,920' MD in the Sag River, according to the directional proposal. Circulate well bore clean, short trip to shoe. POOH. 21. Run a 4 Y2", 12.6#, L-80 slotted production liner. POOH. 22. R/U and run a 3 1/2", 9.2#, L-80 completion, stinging into the 4 1/2" liner tie back sleeve. 23. Set packer and individually test the tubing and annulus to 3,500psi for 30 minutes. Record each test. 24. Set a BPV, with blanking plug, if required. 25. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi. 26. Freeze protect the well to -2,200'. Secure the well. 27. Rig down and move off. Post-Ria Work: 1. MI I RU slick-line. Pull the ball and rod I RHC plug from landing nipple below the production packer. Install gas lift valves. 2. Install well house and instrumentation. Estimated Pre-rig Start Date: 01/15/04 Estimated Spud Date: 02/01/04 Dave Wesley, Jr. Operations Drilling Engineer 564-5153 17-07 Application for Sundry i,VG/{ ; I ~ {ì..-OO c.¡- . ( STATE OF ALASKA ( ,,-)( 'fLfc~ , ALASKA OIL AND GAS CONSERVATION COMMISSION ' APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: ~ Abandon 0 Suspend 0 Operation Shutdown 0 Perforate 0 Variance 0 Other 0 Alter Casing 0 Repair Well ~ Plug Perforations 0 Stimulate 0 Time Extension 0 Chanqe Approved Proqram 0 Pull Tubinq 0 Perforate New Pool 0 Re-Enter Suspended Well 0 Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Numbe/ BP Exploration (Alaska) Inc. LiI Development 0 Exploratory 181-066 3. Address: 0 Stratigraphic 0 Service 6. API Number: / P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20596-00-00 7. KB Elevation (ft): KBE = 71' 9. Well Name and Number: 17-07 / 8. Property Designation: 10. Field / Pool(s): ADL 028331 Prudhoe Bay Field / Prudhoe Bay Pool 11., ""~',' "",'~. ';"'", ,..'.. '." ,I 'i """,' ,PijESENTWELLGQrsJDITlqN$UMM~~Y: "'" ',,"."':,~,""" '," I, ",.",," ,'" " ""'"~ .'"""", Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10790 9515 9880 8664 9880 10632 Caàìöó' 'Lêrll:ith ' Size ,MD. ' , ND """Burst Collapse Structural Conch Ii"fnr 80' 20" 80' 80' 1530 520 ~lIrf::lCP. 2687' 13-3/8" 2687' 2687' 5380 2670 .., 9962' 9-5/8" 9962' 8739' 6870 4750 prnri"dinn Linp.r 1133' 7" 9657' - 10790' 8462' - 9515' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10026' - 10267' 8797' - 9022' 5-1/2",17# x 4-1/2",12,6# L-80 / N-80 9644' Packers and SSSV Type: 9-5/8" x 5-1/2" Baker 'SAB' packer; Packers and SSSV MD (ft): 9567' 5-1/2" Cameo 'BAL-O' SSSV Nipple 2178' 12, Attachments: 13. Well Class after proposed work: LiI Des~ription Su~mary of Proposal 0 BOP Sketch 0 Exploratory LiI Development 0 Service 0 Detailed Operations Program 14. Estimated Date for /" 15. Well Status after proposed work: Commencing Operations: January 15, 2004 0 Oil 0 Gas 0 Plugged LiI Abandoned 16. Verbal Approval: Date: 0 WAG 0 GINJ 0 WINJ 0 WDSPL Commission Representative: 17, I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dave Wesley, 564-5153 Printed Name Bill Isaacson Title Senior Drilling Engineer II ' h . I Prepared By Name/Number: SiQnature L '.1'\_, . II,.. Phone 564-5521 Date IZ 1ð oj Terrie Hubble, 564-4628 " '. , ,,' ,.. '," ", ' " '" "Commission, Use Only' T Sundry Number: :3l>~ "~':2) Conditions of approval: Notify Commission so that a representative may witness 0 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance RECEIVED Other: 0 E C 3 1 2003 . ~, . ", ',~' Øfl~ JÀN \) 7 lUU~\\ Alaska Oil & Gas Cons. Commission Subsequent form required 10- 4- 0 ì ' ' , , Anchorage ." , , BY ORDER OF L'~-"- f ';1 1 Approved By: anginal S~gned BV COMMISSIONER THE COMMISSION Date ,~ ()\..../\ Form 1 0-403 Revised 2/2003 ...alll! 0 RIG I !\ I~, !" Submit In Duplicate TREE =, FMC GEN 2 ¡,II ('" WELLHEAD= FMC " 17 07 SAFETY NOTES: TxlA COMMUNICATION, ACTUATOR = AXELSON - CT PATCH SET ACROSS GLM#10 KB. ELEV = 71' BF. ELEV = ? KOP = 3277' Max Angle = 48 @ 8600' 2178' -1 5-1/2" CAMCO BAL-O SSSV NIP, ID = 4,562" I Datum MD = 10105' (I) GAS LIFT MANDRELS Datum TVD = 8800' SS ST MD TVD DEV TYÆ VLV LA TCH PORT DA TE 1 2860 2860 2 HES/N-15R RK 2 4968 4774 36 HES/N-15R RK I 13-3/8" CSG, 72#, N-80, 10 = 12,347" 1 2687' 3 6653 6106 37 HES/N-15R RK 4 7798 7041 34 HES/0-20R RK 5 8549 7608 48 CA/RD RK 6 8623 7657 48 HES/D-14R RK 7 9077 7983 41 CA/RD RK 8 9158 8046 39 CA/RD RK 9 9403 8245 34 HES/D-14R RK Minimum ID = 2.250" @ 9569' 10 9483 8312 36 CA/RDO PATCHED HES XN NIPPLE 9445' 5-1/2" HES RETRIEVABLEB TBG PATCH (SET 01/09/95), 10 = 2,350" 9554' -i 5-1/2" BAKER PBR ASSY I 9567' --I 9-5/8" X 5-1/2" BAKER SAB PKR I 9569' -i HES XN NIP, 10 = 2.250" I 5-1/2" TBG-PC, 17#, L-80, 9580' 9575' -1 MULESHOE 1 .0232 bpf, 10 = 4.892" 9580' -i 5-1/2" X 4-1/2" XO I TOPOF 4-1/2" TBG-PC 1 9580' 9642' -i 4-1/2" CAMCO DB-6 LANDING NIP, ID = 3.813" 1 I 9643' l-i 4-1/2" BAKER SHEAROUT SUB 1 4-1/2" TBG-PC, 12.6#, N-80, 9644' 9644' -i 4-1/2" TUBING TAIL I ,0152 bpf, 10 = 3.958" I 9618' l-i ELM IT LOGGED 06/16/81 I TOPOF 7" LNR I 9657' I 9880' 1-1 TOP OF SA NO (12/09/03) 1 I 9-5/8" CSG, 47#, L-80, 10 = 8.681" I 9962' ÆRFORA TION SUMMARY REF LOG: BHCS ON 06/04/81 ANGLE AT TOP ÆRF: 22 @ 10026' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 5 10026 - 10046 C 10/29/94 3-3/8" 8 10148 - 10188 C 05/01/82 3-3/8" 8 10202 - 10242 C 05/01/82 3-3/8" 4 10257 - 10267 C OS/25/84 3-3/8" 4 10257 - 10267 C OS/25/84 10632' -i MC-VR-STD (LOST 05/16/89) I PBTD l-i 10755' 1 17" LNR, 29#, L-80, .0371 bpf, 10 = 6.184" I 10790' DA TE REV BY COMMENTS DA TE REV BY COMMENTS PRUDHOE BAY UNIT 06/11/81 ORIGINAL COMPLETION WELL: 17-07 02/06/01 SIS-LG REVISION ÆRMITNo: 1810660 07/15/01 RNlTP CORRECTIONS API No: 50-029-20596-00 10/26/01 CJITP ÆRF STATUS CHANGE SEC 22, T10N, R15E, 3377,11' FEL & 3628.45' FNL 02/09/03 A TDITP DELETE WAIVER SAFElY NOTE 12/20/03 KEY/TLH SAND DUMP BP Exploration (Alaska) ~ , TREE::; FMC GEN 2 . . ' I w£L~~~g~_-------_.~ 17 -~ 7 Pre-rig Cond ..~on ACTUA TOR = AXElSON -----", -",-,---,----- ,--,- ------ --.,--,-,._, KB, ElEV = 71' , ,.., -, --.. .. ,-, .. BF. ElEV = ? KOP = 3277' MaxAl1gie; 48"@-86Ö¡)i 2178' -1 5-1/2" CAMCO BAL-O SSSV NIP, ID::: 4.562" I ~tu~~ ;~"..__i~~~~i 8 GAS LIFT MANDR8..S DatumTVO= 8800'SS ST MD TVO DEV TYÆ VLV LATCH PORT DATE 1 2860 2860 2 HES/N-15R RK 2 4968 4774 36 HES/N-15R RK I 13-3/8" CSG, 72#, N-80. 10 = 12.347" I 2687' 3 6653 6106 37 HESlN-15R RK 4 7798 7041 34 HES/0-20R RK 5 8549 7608 48 CAIRO RK 6 8623 7657 48 HES/D-14R RK 7 9077 7983 41 CAIRO RK SAFETY NOTES: TxlA COMMUNICATION, 8 9158 8046 39 CAIRO RK CT PATCH SET ACROSS GLM#10 9 9403 8245 34 HES/D-14R RK 10 9483 8312 36 CA/ROO PATCHED / I Pre rig tubing chemical cut I~ -7,600' I~ ~ e I I I 9445' 1- 5-1/2" HES RETRIEVABLE B TBG PATCH (SET 01109/95), 10 = 2.350" I 9554' I~ 5-1/2" BAKER PBRASSY I / -I 9567' 1-1 9-5/8" X 5-1/2" BAKERSAB A<R I I Pre rig cement P&A 1-1 -9,550' I I 9569' 1-1 HES XN NIP, 10 = 2.250" I 5-1/2" TBG-PC, 17#, L-80, ~ 9580' I I 9575' 1-1 MULESHOE .0232 bpf, 10 = 4.892" I 9580' 1-1 5-1/2" X 4-1/2" XO 1 TOPOF 4-1/2" TBG-PC 1-1 9580' I I 9642' 1-1 4-1/2" CAMCO OB-6lANOING NIP, ID = 3.813" 1 4-112" TBG-PC, 12,6#, N-80, -1 9644' I I 9643' 1-1 4-1/2" BAKER SHEAROUT SUB I .0152 bpf, 10 = 3.958" TOPOF 7" LNR 1-1 9657' 1 I 9644' 1-1 4-112" TUBING TAIL I 1,:°' 1 Sand Back plug top (est.) 1-1 -9,880' I PERFORATION SUMMARY I 9-5/8" CSG, 47#, L-80, 10 = 8.681" 1-1 9962' I REF LOG: BHCS ON 06/04/81 ANGLE A T TOP ÆRF: 22 @ 10026' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DA TE 3-3/8" 5 10026 - 10046 0 10/29/94 3-3/8" 8 10148 - 10188 0 05/01/82 3-3/8" 8 10202 - 10242 C 05/01/82 3-3/8" 4 10257 - 10267 C 05/25/84 3-3/8" 4 10257 - 10267 C 05/25/84 I I I 10632' 1-1 MC-VR-STO (LOST 05/16/89) I PBTO 10755' 17" LNR, 29#, L-80, .0371 bpf, 10 = 6.184" I 10790' OA TE REV BY COMMENTS OA TE REV BY COMMENTS PRUDHOE BA Y UNIT 06/11/81 ORIGINAL COMPLETION 12/23/03 DEW Proposed pre rig work. W8..L: 17-07 12/09/00 SIS-MWH CONVERTED TO CANVAS PERMIT No: 1810660 02/06/01 SIS-LG REVISION API No: 50-029-20596-00 07/15/01 RNlTP CORRECTIONS SEC 22, T10N, R15E, 3377.11' FEl & 3628.45' FNL 10/26/01 CJ/TP PERF STATUS CHANGE 02/09/03 ATD/TP 08..EfEWAIVERSAFETY NOTE BP exploration (Alaska) MEMORANDUM- State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser DATE: Commissioner December 15, 2000 THRU: Tom Maunder, P. I. Supervisor FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit Drill Site 17 Friday~ December 15~ 2000: I traveled to BPX's Drill Site 17 and witnessed the semi annual Safety Valve system testing. As the attached AOGCC Safety Valve System Test Report indicates I witnessed the testing of .15 wells and 30 components with one failure. The Surface Safety Valve on' Well 17-4 Failed to close on its initial test. After this valve was serviced and the' hyd lines flushed it operated properly and passed the.retest Mark Womble performed the testing today; he demonstrated good test procedures and was a pleasure to work with. I also inspected the wellhouses on this location while witnessing SVS tests. All the wellhouses and associated equipment appeared clean and in good condition Summary: I.witnessed SVS testing .at BPX's PBU Drill Site 17. PBU DS17, 15 wells 30 components 1 failure 3.3% failure rate 19 Wellhouse inspections Attachment: SVS PBU DS17 12-15-00 CS X Unclassified Confidential (Unclassified if doc. removed') Confidential Alaska Oil and Gas Conservation CommiSsion Safety Valve System Test Report Operator: BPX Operator Rep: Mark Womble AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe / PBU / DS 17 Separator psi:, LPS 165 Date: 12/15/00 HPS Well Permit Separ Set L~ Test Test Test Date Oii, wAG, G~j, Number Number PSI PSI T~p Code Code Code Passed GASorCYCLE ~7-01 1800550: 165 150 130 P P OIL 17-02 1800700' 165 150 10.0 P P 'O~ 17-03A 1972160 165 150 110 P P , 17-04A 1960500 165. 150 120 P 5 12/15/00 OIL 17-05 1800960 165150 110 P P O~ 17-06 1801320 17-07 .... ~!1i$!0660 165 150 140 'P P Om 17-08 1810740 . ,,, 17-09 1810900 165' '. 150 100 P P · OIL , 17-10A 199:1'1.00 ' 17-11 1842440 · 165 150. 120 'P P OIL! 17-12. 184.2450 165 150 '120 P P . . OIL'l 17-13 1841790 165 150 110 P P . OIL 17-14 · 1841660 165 1501 140 'P P OIL 17-15A 1991310: " · · , 17-1.6 1920910! 165 150 '130 P P .' OIL 17'19A 19705501 "165 · 150 130 P P ' OIL !17'20 1921150 165 150 1'20 "P' P' ' OIL' 17-21 .19212501 165 150' '130! P · P. 0IL . Wells: 15 Components: 30 Failures: 1 Failure Rate: 3~3% Elgo var Remarks: Surface Safet~ on 17-4 failed to cio'se, itwas Serviced and retested, 12/19/00 Page 1 of l SVS PBU DS17 12-15-00 CS.xls GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9606 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 8/1/95 Well Job # Log Description Date Field: Prudhoe Bay Floppy BL RF Sepia DIR MWD Disk D.S. 14-34 ~-.~?-~ ~ ~ ~ PROD PROFILE 9 5 0 7 ! 4 I 1 D.S. 16-!3 "~, .[ ~.-"~' INFLATABLE BRIDGE PLUG 950713 I 1 O.S. 17-7 ~[, (~ (~ PRODPRORLE .95..071 4 I I ,, ,, , SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ' ALASI' L AND GAS CONSERVATION(~ '~)MMISSION REPOR'T SUNDRY WELL OPERATIONS 1. Operations performed: operation shutdown Stimulate Plugging Pedorate X Pull tubing Alter casing Repair well O~er X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T1 ON, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1650' FSL, 1909' FWL, Sec. 15, T10N, R15E, UM 5. Type of Well Development Exploratory StralJgraphic 6. Datum of elevation(DF or KB) 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7  mber/approval number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth' measured true vertical 10790 feet 9512 feet Plugs(measured) PBTD @ 10258' MD (10/23/94) Effective depth: measured 10258 feet true vertical 9014 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 232 sx AS II 80' 80' Sudace 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II 2687' 2687' Production 9891' 9-5/8" 500 sx CIG 9962' 8742' Liner 1133' 7" 420 sx CIG 10790' 9512' Perforation depth: measured 10026-10046'; 10148-10188'; 10202-10242'; 10257-10267' true vertical 8801-8819'; 8911-8948'; 8961-8999'; 9013-9022' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 9580' MD; 4-1/2", 12.6g, N-80, PCT tail @ 9644' MD Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSSV @ 2178' MD; Baker SAB packer @ 9507' MD 13. Stimulation or cement squeeze summary 14. RECEIVED Intervals treated(measured) See Attached Treatment description including volumes used and final pressure MAF{ - 7 1995 Reoresentative Daily Averaae Production or Iniection DaiE- ...... Anch0 OiI-Bbl Gas-Md Water-Bbl Casing Pressure TUbing Pressure Prior to well operation Shut In Subsequent to operation 769 702 5973 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Operations OilX Gas _._ Suspended ..._ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Engineering Supervisor FOrm 10-404 Rev 06/15/88 250 Date '~/I/~ ~"~ SUBMIT IN DUPLICATE cc: KZ, JWP 17-7 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 7/5/94 · Ran a leak detection log indicating a leak was present at 9483' MD, at GLM #10. I 0/23/94' RIH & tagged PBTD at 10258' MD. I 0/29194' MIRU & PT equipment. RIH w/perforating gun & shot 20' of reperforations at: 10026 - 10046' MD (Sag) Ref. Log: BHCS 6/4/81. Used a 2-1/8" carrier & shot 4 spf at 180 degree phasing at overbalanced pressure. POOH w/perf gun. Noted all shots fired. Rigged down. 11/16/94- Performed a leak detection log indicating a leak was present at the 5-1/2 x 4-1/2" crossover at 9580' MD, just below the production packer. 11/29/94 - 1 2/2/94' RIH w/5-1/2" Repeta Packer w/2-7/8" tail assembly & set assembly at 9560' MD (middle of packer element). Ran & set PXN plug in 2-7/8 tail & PT tubing to 3000 psi OK. POOH leaving top of packoff assembly at 9550' MD. Rigged down. 1/9/95: MU & RIH w/5-1/2" Repeta Tubing Patch w/2-7/8" tubing & sealbore extension, and stabbed into the lower packer receptacle (above) to complete straddle assembly across leaking GLM #10. POOH leaving straddle top packer set at 9447' MD (middle of packer element) & top of patch at 9445' MD. Patch minimum ID is 2.25" XN nipple at 9566' MD. Rigged down. 1/13/95' PT tubing/patch assembly to 3000 psi OK. 1/16/95' RIH & retrieved the PXN plug from the 2-7/8" tubing tail. Returned the well to production w/gas lift & obtained a valid welltest. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9142 Company: 12/12/94 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar iD.S. 2-03 ~---7~::) "- ~-/'// PERF RECORD (11-29-94) I 1 !D.S. 3-18A '.¢~ '~- 4//~2-- PERF RECORD (11-28-94) I 1 D.S. 4-37~ //'~ ( O '7 RST (11-26-94) I 1 LEAK DETECTION (11-23-94) I 1 D.S. 9-21 '" TBG PATCH RECORD (11-22-94) I 1 D.S. 13-3 ~ ,~'.-- (~, ?..._ LEAK DETECTION (11-25-94) I 1 D.S. 14-11 ~'~ ~- ~ 3 I BOTTOMHOLE PRESS SURVEY (11-25-94) I 1 D.S. 14-12 "~- (... 16 _¢[ BOTTOMHOLE PRESS SURVEY (11-25-94) I 1 O.S. 16-21 ~'-~'-J-- 3/'7..--- LEAK DETECTION (11-22-94) I 1 D.S. 17-07 ~ / -- (,,~, PACKER SETTING RECORD (11-29-94) I 1 -- ¢ SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9134 Company: 12/5/94 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar PWDW 3-1 -'~ ~" h ~ STATIC BHP SURVEY (11-15-94) I ~ 1 D.S. 3-7 7(_~-- ~'~ ~'-.-~ PERF RECORD (11-20-94) I 1 D.S. 3-10 ~ ~-C~--/ INJEC PROFILE (11-17-94) I 1 D.S. 3-32A 0/~ ~/-/'~d.~'- ~/ PROD PROFILE (11-14-94) I 1 D.S. 4-19 ~ ~C~, -O -z-I' DUAL BURST TDT-P (11-21-94) I 1 D.S. 7-19 ~'~--'~-I 7 CNL ((11-13-94) I 1 D.S. 9-21 X'"' ~' ~ --//~ O LEAK DETECTION (11-11-94) I 1 O.s. 9-21 4~,~.. ~Y~ .-- / ~ C) TUBG PATCH RECORD (11-22-94) I 1 D.S. 9-47 ~ ~ ,- ~/~, PROD PROFILE (11-15-94) I 1 D.S. 9-49 (~, ~ "~-~- ~/,~ ~ PROD PROFILE (11-14-94) I 1 D.S. 11-31~ . ~,.'~,.~--~./'2.~_~. R.O.P.E. PERF RECORD (11-14-94) I 1 D.S. 11-32 ~ ~ ~'(7/--f ~_/ R.O.P.E. PERF RECORD (11-15-94) I 1 D.S. 15-41 / "~'~ '~'-' ~7 GR-CCL (11-11-94) I 1 D.S. 16-21 ~.,~'-- ~/"/_ LEAK DETECTION (11-22-94) I 1 D.S. 17-7 ,~/---d(~, LEAK DETECTION (11-16-94) I 1 D.S. 17-13 ./~- ~--/~ ~ LEAK DETECTION (11-16-g4) I I SIGNED: ~~ Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest ~ W. International Alrl~rl Road Anohorage, AK 99518-1199 ATTN: Sherrle NO. 9086 Company: Alaska Oil & Gas Cons Comm , Attn: Larry Grant I 3001 Porcupine Drive Anchorage, AK 99501 11/4/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar D.S. 4.2A ~ U /m ! GR-CCL (10-26-94) 1 1 D.S. 4-2A ! /-' / ~ I CBT (10-26-94) 1 1 D.S. 4-30 ST1 ~ ~"'.- ~'c~ PROD PROFILE (10-29-94) 1 1 D.$. 4-40 ~--~-J Z7. ~'~ PROD PROFILE (10-28-94) 1 1 D.$. GAS LIFT SURVEY (10-26-94) 1 1 D.$. 17-7 ~1' I - ~,~/_ ' PERF RECORD (10-29-94) 1 1 I VI'FI Please sign and return one copy of this transmiffal to Sherrle at the above address. Thank you. AJa~ka oii & G~.~o~l/2mi~s ' [- tt 1 ARCO Alaska, Inc. Date' Subject: From/Location- Telephone: To/Location- September 12, 1994 Kinley Caliper Survey's Karla Zuspan/ATO- 1529 (907) 263-4310 Distribution P.O. Box10036~ Anchorage, AK Transmittal #: 94106 99510~ ~ Number of Records: iWell Number ! 03-01 03-28 09-02 ' i 12-15 i 17-07 Log Date i Tool Type i Contractor (M-D-Y)1 08-07-94 ~ Caliper Survey I Kinley 08-07-94 t Caliper Survey i Kinley 08-08-94 i CaliperSurve¥ i Kinley 08-05-94 I Caliper Survey i Kinley 08-06-94 I Caliper Survey Kinley Karla Zuspan Distribution: Central Files ANO-8 Geology BPX ~ EXxon State of Alaska Pledge ,~¢~i~y signing and returning a copy of transmittal. B/ye.../' ~/"./~,.~./~ /2.~-- ..... Date: ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompeny 500292059600 ARCO (ALASKA) Survey No. 24107 PRUDHOE BAY, 'AK ' August 6, 1994 %~'% 'r' ILEY SURVEY INTERPRF ' Common Abbreviations LTION TABULATION SHEET: IOIN'TS: are numbered from the top down. Numbering starts with the first full joint below the Christmas tree. PUP IOINTS: are designated by decimal numbers. For example, joint 32.1 represents the first pup joint below joint no. 32. SPECIAL,TOOLS & NIPPLE~: are designated bY letters. For example, "B" is the second special tool or nipple from the top of the well. GAS LIFT MANDRELS: are numbered down from the top, as shown: GLM (1), GLM (2), etc. TABULATION SYMBOLS We use a circle as the basic tabulation symbol. The Kinley Caliper records the simultaneous action of all fifteen or thirty feelers. Our survey, therefore, has either 15 or 30 lines. These lines provide a view arotmd the circumference of the inner surface of the pipe. A complete circle on the tabulation sheet indicates that at least 14 of 15 feelers, or 28 of 30 feelers found tubing wall reductions at the same depth in the weU. This would be described as a ring. The number of feelers that indicate tubing wall reductions at the same depth is also noted on the tabulation sheet. For a 15-Feeler Caliper D3to5 D6to9 O 10to 13 D 14to 15 For a 30-Feeler Caliper PIT- A number alone represents the depth of penetration, expressed in hundredths of an inch, of the deepest pit. In this example 0.08". A groove around the pipe, found by 14 of 15 feelers or 28 of 30 feelers. The number inside the drde represents the maximum depth of the ring, expressed in hundredths of an inch. A PARTIAL RING - A groove around the pipe, found by 3 to 13 of 15 feelers or 6 to 27 of 30 feelers. The number inside the partial circle represents the maximum depth of the ring, expressed in hundredths of an inch. MINOR DAMAGE - Indicates a "minor" amount of damage that is not severe enough to warrant measurement. O NO COMMENT - Indicates no damage was found in that joint. Arco (Alaska), Inc. Prudhoe Bay, AK Drill Site #17-07 August 6, 1994 Survey No. 24107 T-30 Chart # M1358 & X1477 This is the first survey of this well to be made with the Kinley Microscopic Caliper. The condition of the internal surface of the 5 1/2" 17# BTRS tubing in the well, from 0' to 9,520' (WLM), is covered in this report. Two separate surveys of this tubing were run. The first run covered the interval from 0' to 7,700' while the interval from 0' to 9,520' was covered on the second run. This report represents a compilation of data from each run. The deepest penetration recorded in the survey is in an area of corrosion located in the lower Pup Joint #216.2. This penetration measures .18" or 59% of the tubing wall thickness. A cross-sectional drawing of the tubing, at the location of the penetration, is included in the report. With the exception of Joint #'s 216.2 and 217, the condition of the tubing surveyed and analyzed ranges from good to fair with respect to corrosive damage. Indications of damage are recorded in most of the joints in the forms of areas of corrosion and roughness of the tubing I.D. As indicated by the Corrosion Profile, the deepest penetrations are recorded in the lower portion of the tubing interval surveyed and analyzed. The pup joints above and below the tool assemblies and GLM's are given individual joint numbers. Indications of corrosive activity are recorded in a number of the pup joints. Picture enlargements of the recordings for some of these assemblies are included in the report. Two of the caliper feelers from 9,280' (WLM) to 9,520'(WLM) did not function properly during the running of the second survey. The rest of the survey recording with the remaining 28 feelers was not affected by the malfunction. CALIPER TECHNICIAN Steve Adcock SURVEY ANALYST Oscar Martinez om Distribution: ARCO (ALASKA), INC., ATTENTION: Records Processor, Room #AT0-1529, P. O. Box 10-3240, Anchorage, AK 99510-3240 (TR) ARCO (ALASKA), INC., ATTENTION: Mr. Jason Weaver, Room #AT0-1788, P. O. Box 10-3240, Anchorage, AK 99510-3240 (1R) Chart received: Report mailed: 08-15-94 08-26-94 KINL Y CALIPER TALLY HEET (Composite) DRILL SITE #17-07 Survey # 24107 August 6, 1994 5 1/2" 17# BUTTRESS Body: 0.304 Upset: 0.304 Penetrations Over 85% (Possible Hole) # of Jts Penetrations 41 - 85% (Poor) JT. #'s 216.2 217 Penetrations 21 - 40% (Fair) JT. #'s 215.1 216.1 214 215 Penetrations 11 - 20% (Good) 33 Penetrations 1 - 10% (Very Good) 163 No Penetrations Recorded 33 TOTAL JOINTS SURVEYED: 235 ( Includes 18 Pup Joints ) DRILL SITE/717-07 PRUDHOE BA Y, AK August 6, 1994 SURVEY # 24 I07 5 ~/2" ! 7~ BUTTRESS CORROSIVE DAMAGE FREO UENC Y DIS TRIBUTIONS MAXIMUM PENETP~Z~ T/ON NUMBER OF JOINTS % WALL LOSS CONFIGURA T/ON NUMBER OF JOINTS DESCRIPTION BODY PENETRATIONS 2O WALL LOSS 40 60 80 PiT DEPTqI"i f l,' l O0 ~,*)c/I~ MEAN STATISTICAL DISTRIBUTION OF DEEPEST BODY PENETRATION PFR JOINT DRILL SITE # t 7-07 PRUDHOE BA Y, AK August ~, 1994 Survey# 24107 5 I/2" 17# BUTTRESS 0,304" Wa/I Thfckness 0.30 0.28 0.28 0,24 O. 22 0.20 0,18 0,16 0,14. 0.12~ 0,10_ 0.08 0 06 0.04 % ?robabil/ty of a Hole 10 20 50 i O0 0 ~ 10 !00 AVERAGE RANK MAXIMUM PROBABLE PENETRA T/ON 0 1 GF DRILL SITE # 17.07 Survey #24107 5 I/2" t 7# BUTTRESS O.D, = 5, 5001n I.D, = 4,892 In I4 0.00 I5 O. O0 1,3 0.02 9 8 I0 0.02 0.04 7 0,02 No Data 11 6 0.03 0.02 12 5 0,02 0.02 4 No Data O, O4 2 O. 04 16 0.02 t 0.02 17 0.12 18 0.17 18 28 O. 18 005 20 27 0.05 0,04 21 26 0.05 O. Ofi 22 25 o 04 23 24 o.o~ 0.04 0.05 0.02 ~9 2~ 0.02 Description: JL # 2 l & 1 CORROSION -- Iower pup jo?nt ~ ~ 18" = 59% Percent Area Reduction = 12,81% Total Area Remaining = 4,33 Sq. fn KINLEY CA . PER 5 1/2" 17# BUTTRESS Body: 0.304 Upset: 0.304 Chart # X1477/M135 Feeler Ratio I · 1 JOINT TABULAT(' gN SHEET DRILL SITE #17-07 PRUDHOE BAY, AK Survey # 24107 August 6, 1994 Run # 1 MAXIMUM MAXIMUM UPSET/MAKEUP BODY DAMAGE . JOINT PENETRATION PENETRATION PROFILE NO % INCHES % INCHES COMMENTS o (%WALL) 10 O. 1 Pup Jt. 1 3 0.01 Roughness; 1st full length Jr. below Tree 2 7 0.02 Shallow corr. 3 4 3 0.01 Roughness 5 3 0.01 Roughness 6 7 0.02 Shallow corr. 7 7 0.02 Shallow corr. 8 3 0.01 Roughness 9 10 3 0.01 Roughness 11 7 0.02 Shallow corr. 12 3 0.01 Roughness 13 3 0.01 Roughness 14 7 0.02 Shallow corr. 15 16 17 3 0.01 Roughness 18 19 7 0.02 Shallow corr. 20 7 0.02 Shallow corr. 21 3 0.01 Roughness 22 23 24 3 0.01 Roughness 25 26 27 28 7 0.02 Shallow corr. 29 3 0.01 Roughness 3,0 3 0.01 Roughness 31 32 3 0.01 Roughness 33 34 7 0.02 Shallow corr. 35 3 0.01 Roughness 36 7 0.02 Shallow corr. 37 38 10 0.03 Shallow corr. 39 7 0.02 Shallow corr. 40 10 0.03 Shallow corr. 41 3 0.01 Roughness 42 43 7 0.02 Shallow corr. 44 10 0.03 Shallow corr. 45 7 0.02 Shallow corr. 46, ,, 3 0.01 Roughness 47 3 0.01 Roughness 48 7 0.02 Shallow corr. 49 50 7 0.02 Shallow corr. -BODY m -UPSET KINLEY PER 5 1/2" 17# BUTTRESS Body: 0.304 Upset: 0.304 Chart # X1477/M135 Feeler Ratio 1 ' I JOINT TABULAT('gN SHEET DRILL SITE #17-07 PRUDHOE BAY, AK Survey # 24107 August 6, 1994 Run # 1 MAXIMUM MAXIMUM UP.~ET/MAKEUP BODY JOINT PENETRATION PENETRATION DAMAGE PROFILE NO % INCHES % INCHES COMMENTS o (% WALL) 51 10 0.03 Shallow corr.; "SSSV" Assembly (A) 52 13 0.04 Shallow corr. 53 7 0.02 Shallow corr. 54 10 0.03 Shallow corr. 55 7 0.02 Shallow con'. 56 7 0.02 Shallow corr. 57 7 0.02 Shallow corr. 58 7 0.02 Shallow corr. 59 10 0.03 Shallow corr. ~ 3 0.01 Roughness 61 62 7 0.02 Shallow corr. 63 7 0.02 Shallow corr. ~ 13 0.04 Shallow corr. 65 3 0.01 Roughness ~ 16 0.05 Shallow corr. 67 7 0.02 Shallow corr. 67.1 7 0.02 Shallow corr.; UPJ; GLM (1) 67.2 3 0.01 Roughness; LPJ 68 7 0.02 Shallow corr. 69 70 71 72 73 74 75 7 0.02 Shallow corr. 76 7 0.02 Shallow corr. 77 3 0.01 Roughness I 78 3 0.01 Roughness 79 7 0.02 Shallow corr. 80 7 0.02 Shallow corr. 8,1 7 0.02 Shallow corr. 82 7 0.02 Shallow corr. 83 7 0.02 Shallow corr. ,8.4 7 0.02 Shallow corr. 85 10 0.03 Shallow corr. 86 7 0.02 Shallow corr. 87 7 0.02 Shallow corr. 88 13 0.04 Shallow corr. 89 7 0.02 Shallow corr. 90 7 0.02 Shallow corr. 91 7 0.02 Shallow corr. 92 10 0.03 Shallow corr. 93 10 0.03 Shallow corr. 94 7 0.02 Shallow corr. 95 10 0.03 Shallow corr. , ,, 96 7 0.02 Shallow corr. 97 7 0.02 Shallow corr. 98 3 0.01 Roughness 99 3 0.01 Roughness ["i00 3 0.01 Roughness -BODY I -UPSET 5 1/2" 17# BUTTRESS Body: 0.304 Upset: 0,304 Chart # X1477/M135 Feeler Ratio 1 · 1 TAB ULAT( ON SHEET DRILL SITE #17-07 PRUDHOE BAY, AK Survey # 24107 August 6, 1994 Run # 1 MAXIMUM MAXIMUM UPSET/MAKEUP BODY JOINT PENETRATION PENETRATION DAMAGE PROFILE ,t NO % INCHES % INCHES COMMENTS 0 (% WALL)" 101 7 0.02 Shallow corr. 102 10 0.03 Shallow corr. 103 10 0.03 Shallow con'. 104 3 0.01 Roughness 105 3 0.01 Roughness 106 107 108 3 0.01 Roughness 109 110 10 0.03 Shallow con'. 111 7 0.02 Shallow con'. 112 7 0.02 Shallow con'. 113 7 0.02 Shallow con'. 114 115 116 3 0.01 Roughness . ' 116.1 3 0.01 Roughness; UPJ; GLM (2) 116.2 7 0.02 Shallow con'.; LPJ 117 3 0.01 Roughness 118 119 10 0.03 Shallow corr. !20 13 0.04 Shallow con'. [ 121 7 0.02 Shallow corr. 122 3 0.01 Roughness 123 13 0.04 Shallow con.. 1H 3 0.01 Roughness 125 3 0.01 Roughness 126 3 0.01 Roughness 127 3 0.01 Roughness 128 7 0.02 Shallow con.. ,,.129 7 0.02 Shallow con.. 130 13 0.04 Shallow con'. 131 7 0.02 Shallow corr. , 132 3 0.01 Roughness - 133 3 0.01 Roughness 134 3 0.01 Roughness 135 7 0.02 Shallow con'. ' 136 13 0.04 Shallow con'. 137 7 0.02 Shallow con'. ,, 138 7 0.02 Shallow con'. 139 3 0.01 Roughness "140 7 0.02 Shallow corr. 141 10 0.03 Shallow con'. 1423 0.01 Roughness 143 7 0.02 Shallow corr. 144 10 0.03 Shallow corr. 145 7 0.02 Shallow corr. 146 7 0.02 Shallow con'. "' 147 20 0.06 Shallow con'. 148 13 0.04 Shallow con'. 149 7 0.02 Shallow con'. 150 10 0.03 Shallow corr. ~ -BODY I -UPSET 5 1/2" 17# BUTTRESS DRILL SITE #17-07 Body: 0.304 PRUDHOE BAY, AK Upset: 0.304 Survey # 24107 Chart # X1477/M135 August 6, 1994 Feeler Ratio I · I Run # 1 MAXIMUM MAXIMUM UPSET/MAKEUP BODY JOINT PENETRATION PENETRATION DAMAGE PROFILE NO % INCHES % INCHES COMMENTS 151 7 0.02 Shallow corr. 152 7 0.~ Shallow corr. 153 7 0.02 Shallow corr. 154 7 0.02 Shallow corr. 155 7 0.02 Shallow corr. 155.1 7 0.02 Shallow corr.; UPJ; GLM (3) 155.2 16 0.05 Shallow corr.; LPJ 156 13 0.04 Shallow corr. 157 10 0.03 Shallow corr. 158 7 0.~ Shallow corr. 159 7 0.02 Shallow corr, 160 7 0.02 Shallow corr. 161 7 0.02 Shallow corr. 162 3 0.01 Roughness 163 7 0.02 Shallow corr. 1~ 7 0.02 Shallow corr. 165 7 0.02 Shfllow corr. 166 10 0.03 Shallow corr. 167 7 0.02 Shallow corr. 168 10 0.03 Shallow corr. 169 7 0.02 Shallow corr. 170 10 0.03 Shallow corr. 171 7 0.02 Shallow corr. 172 7 0.02 Shallow corr. 173 10 0.03 Shallow corr. ,,174 7 0.02 Shallow corr. 175 7 0.02 Shallow corr. 176 10 0.03 Shallow corr, 177 7 0.02 Shallow corr. ,178 7 0.02 Shallow corr. i, 179 7 0.02 Shallow corr. 180 13 0.04 Shallow corr. 181 7 0.02 Shallow corr. 181.1 7 0.02 Shallow corr.; UPJ; GLM (4) 182 13 0.04 Shallow corr. 183 7 0.02 Shallow corr. 184 7 0.02 Shallow corr. 185 186 187 188 7 0.02 Shallow corr. 189 190 10 0.03 Shallow corr. 191 7 0,02 Shallow corr. 192 10 0.03 Shallow corr. 193 7 0.02 Shallow corr. 194 10 0.03 Shallow corr. 195 13 0.04 Shallow corr. 196 10 0.03 Shallow corr. 197 13 0.04 Shallow corr. 198 13 0.04 Shallow corr. 198.1 13 0.04 Shallow corr.; UPJ; GLM (5) !99 16 0.05 Shallow corr.; LPJ 200 7 0.~ Shallow corr. -BODY I -UPSET KINLEY CAI{tPER JOINT TABULAT 'gN SHEET 5 1/2" 17# BUTTRESS DRILL SITE #17-07 Body: 0.304 PRUDHOE BAY, AK Upset: 0.304 Survey # 24107 Chad # X1477/M135 August 6, 1994 Feeler Ratio I · I Run # 1 MAXIMUM MAXIMUM JOINT UPSET/MAKEUP BODY DAMAGE PENETRATION PENETRATION n PROFILE NO % INCHES % INCHES COMMENTS '[ (%WALL) 10 200.1 7 0.02 Shallow corr.; UPJ; GLM (6) 200.2, 7 0.02 Shallow corr.; LPJ 201 7 0.02 Shallow corr. 202 10 0.03 Shallow corr. 203 7 0.02 Shallow corr. 204 13 0.04 Shallow corr. 205 10 0.03 Shallow corr. 206 13 0.04 Shallow corr. 207 13 0.04 Shallow corr. 208 20 0.06 Shallow corr. 209 13 0.04 Shallow corr. 209.1 13 0.04 Shallow corr.; UPJ; GLM (7) 209.2 20 0.06 Shallow corr.; LPJ 210 13 0.04 Shallow corr. 210.1 13 0.04 Shallow corr.; UPJ; GLM (8) 211 13 0.04 Shallow corr. 212 16 0.05 Shallow corr. 213 20 0.06 Shallow corr. 214 23 0.07 Corr. 215 33 0.10 Corr. 215.1 39 0.12 Corr.; UPJ; GLM (9) 215.2 16 0.05 Shallow corr.; LPJ 216 20 0.06 Shallow corr. 216.1 33 0.10 Corr.; UPJ; GLM (10) 216.2 59 0.18 Corr.; LPJ 217 43 0.13 Corr.; Survey ends in Jt. #217 @ 9,520' (WLM) -BODY I -UPSET · · · · · : : ,I : : : : : : . .: : : .. ., · ., -' II I -- ~ ........... -- -- "'~'_ · -- I I ,ml- ~-- .___~, · ~ ...... . ~. _ _~:.~-;-._:..~ .. . : : " ' ,." .. .i ..- ;- . ARCO Alaska, Inc. Date: Subject: From/Location: Telephone: To/Location: August 3, 1994 ARCO Cased Hole Finals Karla Zuspan/ATO- 1529 (907) 265-6547 Distribution P.O. Box 100360, /~..norage, AK .., Transmittal #: 94068 99510,~ ~, Well Log Date Tool Type Contractor Number (M-D-Y) 01-03 7-4-94 Leak Det 1 SCH 03-12 7-2-94 Inj Prof 1 SCH 03-19 7-7-94 Prod Prof 1 SCH 03-25A 7-7-94 Perf Record 1 SCH 04-02 7-3-94 Leak Det I SCH *04-07 ST1 7-8-94 Perf Record I SCH 05-01 7-9-94 Tubing Cutter I SCH 05-11 7-9-94 Perf Record I SCH 06-11 7-2-94 Dual Burst TDT-P I SCH 06-21 7-1-94 Prod Prof 1 SCH 06-22A 7-4-94 Perf Record 1 SCH 07-02' 7-4-94 Prod Log 1 SCH 09-31A 7-8-94 G R/Collar ' 1 SCH 09-32 7-7-94 Dual Burst TDT-P 1 SCH 15-01 7-2-94 Prod Prof I SCH 16-02 7-5-94 Inj Pmf 1 SCH ' 16-10 7-6-94 Inj Pmf I SCH 16-24 7-3-94 Perf Record 1 SCH 17-07 7-5-94 Leak Det 1 SCH *The correct APl number for 04.07 ST1 is 50-029-20189-00. Number of Records: 19 '-------1 / Karla Zuspan Distribution: Central Files Phillips ANO-8 Geology BPX Exxon State of Alaska Mobil Please~g~*~~/~by signing and returning'f/~.p, y'C~,sr,~s~s~~k~ B y~//r,// ~, .. ~ D a t e' ARCO Alaska, Inc. Is a Subsidiary of AllanllcRIchfleldCompeny ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 8-10-93 REFERENCE: ARCO CASED HOLE FINALS 1-6 7-31'93 1-12 7-27-93 1-29 7-27-93 /3-20A 821-93 ~3-20A 8-1-93 6-6 7-26-93 6-13 7-30-93 11-13A 7-28-93 12-26 7-29-93 13-7 7-30-93 14-22A 7-31-93 15-4 7-27-93 -15-6 8-2-93 15-24 7-27-93 15-25 8-3-93 16-6 7-30-93 17-1 8-1-93 17-7 8-3-93 17-9 Production l~og _~un' Productio,n Log~~z~R.n PerfRecord~qz--gqt0 R-n Production Log I~rlSl Burst TDTP Perf Record u~- ~zz%'~ Run 1, 5" Sch Perf Record ~qw-~o Run 1, 5" Sch Perf Record~o~ -~c~? ~ Run 1, 5" Sch Perf Record ~ 0or-d. I~ I~ Run 1, 5" Sch Perf Record ~o~o-io~o Run 1, 5" , Sch Perf Record~5o-lZt~O Run 1, 5" Sch Dual Burst TDTP Run 1' 5"T~.- ~0~ch Dual Burst, TDTP Run 1, 5"~z~6~Sch CNL ~_c~9 Run 1, 5" Sch · Dual Burst TDTP ~zco --Run 1, 5" ~ Sch Production Log~~,~]~un 1, 2"&5"zcco-Sch Production LOg" -~I/un Production Log Run 8-2-93 Production LOg" Run 1, 5" 10~H I?~Sch 1, 5" Sch 1, 2"&5" Sch 1, 5"~b-~ ~5~Sch a~1~0 1, 2"&5"~-~0-Sch~ ~ 1, l"&5"zco-Sch 'i o~9 1, 2"&5"7c~- Sch ~ Please sign and' return the attached cope as receipt of data. RECEIVED BY_~~ ~f/_. ~ Have A Nice Day! · % u°~o ~/~, # CLINT CHAPMAN # BPX # EXXON # STATE OF AI~.SKA MARATHON TEXACO # MOBIL The correct API# for ll-13Ais 5(k029-2122~01 not 50-12~21229-01. The correct API# for 14-22t is 50~29-20747-01. The API# for 16~6 is 50-029-~. STATE OF ALASKA "' ' ALASK,~ ;L AND GAS CONSERVATION C.~'~ ~'MISSION REPORT' UF SUNDRY WELL OI:: RATIONS 1. Operations performed: Operaa3n ~humown ~. S~muate ~ P~Jogb~g ~ Pedorate ---- Pull tubing ---- Altar casing --... Repair well 2. Name of Operator ARCO Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1650' FSL, 1909' FWL, Sec. 15, T10N, R15E, UM 5. Type of Well Development X...~_ Exploratory -- S~oraph~= RECEIVED UAR t ~ 199) Al~sk8 Oil & G~s Cons. Anohomg~ 6. Datum of elevation(DF or KB) 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number/approval number 81-66 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10790 feet 9512 feet Plugs(measured) Fill @ 10320' MD (1/23/93) Effective depth: measured 10320 feet true vertical 9076 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 232 sx AS II 80' 80' Surface 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II 2687' 2687' Production 9891' 9-5/8" 500 sx Cl G 9962' 8742' Liner 1133' 7" 420 sx Cl G 10790' 9512' Perforation depth: measured 10026-10046'; 10148-10188'; 10202-10242'; 10257-10267' true vertical 8801-8819'; 8911-8948'; 8961-8999'; 9013-9022' Tubing (size, grade, and measured depth) 5-1/2", 17', L-80 @ 9580' MD; 4-1/2", 12.6#, N-80, PCT tail @ 9644' MD Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSSV @ 2178' MD; Baker SAB packer @ 9567' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations __ Reoresentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 533 4345 3143 -- 1034 ,--~' 7732 3830 -- 16. Status of well classification as: Oil x...~. Gas..._ Suspended..._ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~e"~'- ~ ' ~ Title Engineering Supervisor Form 10-404'Rev 06/15/88 970/1 MJB cc: SW, JWP Tubing Pressure 211 311 SUBMIT IN DUPLICATE 17-7 DESCRIPTION OF WORK COMPLETED NITRIFIED HCL STIMULATION TREATMENT 1/21/93: RIH & tagged bottom fill at 10245' MD. 1/23/93: MIRU CTU & PT equipment to 4000 psi. POOH w/CT. Rigged down. RIH w/CT & jetted a fill cleanout down to 10320' MD. 1/24/93' ^ three stage Fullbore Nitrified HCl Stimulation for scale removal was performed as follows: MIRU & PT equipment to 4000 psi, then pumped the treatment through the perforations at: 10026 - 10046' MD (Sag) 10148 - 10188' MD (Z4) 10202 - 10242' MD (Z4) 10257 - 10267' MD (Z4) Ref Log: BHCS 6/4/81. Pumped Stage #1' a) 20 bbls 1% NH4CI Water, followed by b) 40 bbls 50% Diesel/50% Xylene @ 8 bpm, followed by c) 10 bbls 1% NH4Cl Water spacer w/foamer, followed by d) 40 bbls 15% HCl w/foamer & Nitrogen injected @ 700 scfb, followed by e) 10 bbls 6% HCI - 1.5% HF w/foamer & Nitrogen injected @ 700 scfb, followed by f) 100 bbls 1% NH4Cl Water w/foamer & Nitrogen injected @ 700 scfb, followed by g) 25 bbls 1% NH4Cl Water w/foamer & Nitrogen injected @ 700 scfb, followed by Stage #2: h) 10 bbls 1% NH4CI Water, followed by i) repeat of steps b through g (listed above), followed by Stage #3: j) 10 bbls 1% NH4CI Water, followed by k) repeat of steps b through e (listed above), followed by I) 400 bbls 1% NH4Cl Water/w foamer, followed by m) Shutdown. Rigged down. 2/1 2/93: Pumped ESL Scale Inhibition treatment. MAR ~ ~ t99,~ Alaska Oil & Gas Cons. Anchorage Returned well to production & obtained a valid production welltest. ARC() ALASKA, INC. F'~O. BOX t (~6, S6(~ ANCHORAi;E, ALAeKA~ 995 i 0 DATE' i'~z-5-0¢,, ~ REFERENCE' AF:CO CA;SiED HOLE F!NAL'2 S-25 ti-4-9,3, F'ROD F'ROFILE RUN ~, S-26 ~¢,--S~-9(~ PROD PROFILE RUN ~, 3-26 ~ ~-26-99 COLLAR/PERF RUN ~, 6-~ ~. ~ ~ -'2~=-~¢,~ . .. PDK-~ ~,6,/GR/CCL RUN ~ , ~6-. ~. PDK-~,3E~/GR/CCL RUN ~ , 7-9 ~ ~-S-9() PIT!~/S'PINNER RUN ~ , 7'-2S i i 24-96' 'F , - CULLAR/PERF RUN i i i-4 I i-4-96, F'ROD PROFILE NUN 1, ti-6 ~ ~-S--9E) PROD PROFII_E RUN ~ , t i-t i i i-7-96~ F'ROD F'RUFILE F~tfiN1 , tS-6 i,E:,-;~t-9(~ MI:i'C GAS' ZNJ PROFILE RUN 2, t4.-i5 !i-5--9E) F'ROD PROFiI_E RUN t , ~. 4 ! i-'25-9¢ VtERTILOG F,'t!i'-4 i , i 6-i 9 i ¢-Si-9E) COL. i_AR RUN i , i '7 .- '? i i .- '~ - o ¢:~ ~, ~:', q n ~. ,-,,. ,,,~,, PROFILE R. tJN t , i7-9 tt 5-9(3 PROD F'ROF=ILE RUN t, t 7-i t t t --~-9¢ F'I:~OD F'R. OFILE RLJN '~ t7-t'2 it--S-9,3 PROD PROFILE RUN i, ~..~ ,, F:'LE-"A;~';E :",:I(;N AN'r£: RETURN 'rile ATTAC'H!~:LD COPY AS RECEiI::"F OF: DATA, RECE];VF::D BY !--! A V E A N I C I!:'. DAY! ,?AL. LY t-IOF=FECI< E'F; ATO- i_,,_~'~ '-~ ¢', · ~r' f' b.. U v b.i, CAMCO CA~'~CO A T'L.A S' A '~ A'f'LA&: CAf'~Ut] A'I'LA$ UAr'*.CO CAMCO CAMCt] CAMCO CAMCO A 'f' L.A iS' CRr'~CO CAPiL;O CAMCO CAMCO CAMCO A I'L..AS~ D I .'":: T R I B U T I 0 N CENTRAL FILE:_? C H E V R 0 N DiM EX]ENSiON EXF'LORATION FXXON MARATHON ''1- PHILLIF'£' PB WELL R & D ~,~- BPX STA'I E OF' I'EXACO RECEIVED DEC 7 1990 Alaska Oil & Gas Cons. Oommission Anchorage STATE OF ALASKA no A S.Ar AND OONSE.V_AT_,ON REPORT SUNDRY WELL 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging Perforate ~ Pull tubing Alter casing ~ Repair well Other 6. Datum of elevation(DF or KB) 2. Name of Operator 5. Type of Well ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1650' FSL, 1909' FWL, Sec. 15, T10N, R15E, UM Exploratory StralJgraphic 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number/approval number 81-66/90-183 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10790 feet Plugs(measured) 9512 feet Effective depth: measured 10755 feet true vertical 9483 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 232 sx AS II 80' 80' Sudace 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II 2687' 2687' Production 9891' 9-5/8" 500 sx CI 'G' 9962' 8742' Liner 1133' 7" 420 sx CI 'G' 10790' 9512' Perforation depth: measured 10026-10046'; 10148-10188'; 10202-10242'; 10257-10267' true vertical 8801-8819'; 8911-8948'; 8961-8999'; 9013-9022' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 9580' MD; 4-1/2", 12.6#, N-80, PCT tail @ 9644' MD Packers and SSSV (type and measured depth)5-1/2" Camco Ba,-0 SSSV @ 217~t1~D' .~~.~~cker @ 9567' MD 13. Stimulation or cement squeeze summary .... ~, · b ~ 14. Intervals treated(measured) See attached .AUG 1 ]990 Treatment description including volumes used and final pressure J[./as~a 0JJ & Gas Cons, Gemmiss[0il Anchnrn~ Reoresentative Daily Averaae Production or Injection Data " OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 2250 2073 1216 -- 234 Subsequent to operation 4498 3164 2615 -- 368 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 457 MRM cc: J. Gruber, AT-1478 SH SUBMIT IN DUPLICATE DS 17-07 DESCRIPTION OF WORK COMPLETED FRACTURE TREATMENT OF SAG RIVER & ZONE 4 4/6/90: RIH & shot perforations in the Sag River at: 10026 - 10046' MD Ref. Log: BHCS 6/4/81. Changed out LGLV's w/DGLV's. RD. 4/9/90: MIRU, & PT lines to 8600 psi. Began pumping Fracture Treatment through perforations at: 10026 - 10046' MD (Sag) 10148 - 10188' MD (Zone 4) 10202 - 10242' MD (Zone 4) 10257 - 10267' MD (Zone 4) Ref. Log: BHCS 10/29/80. Pumped: a) 250 bbls Pre Pad at 45 bpm, 4200 psig. b) Shutdown for 20 minutes. ISIP at 2080 psi. Resumed pumping: c) 2750 bbls Cross Linked Pad, at 45 bpm, 3900 psig, followed by d) 750 bbls Sand Slurry, at 2-10 ppg at 45 bpm at 3600 psig, followed by e) 70 bbl Flush. Shutdown. Placed a total of 165,000 lbs of proppant into formation. Rigged down. 4/10/90: RIH & cleaned out carbolite from wellbore. RD. 4/12/90: MIRU, & RIH to tag bottom at 10099' MD. Pulled DGLV's and replaced w/LGLV's. RD. Returned well to production and obtained a valid welltest. ARCO ALASKA, F'. O. BOX J ANCHORAGE, ALASKA DATE' . 512419e 995J ;~ RECEIfED Oil & Gas cons. ~'ummission Ancl~orage REFERENCE' ARCO CASED HOLE FINALS J-? 4-6-9~ COLLAR i -t ~ 5-~ 6-9~ COLLAR ~°-°9~ ~:~-J 5-9~ GAMMA · RE~ORD 2-29A 5-J7-9e F'ERF "'£ -' 4'-3 5-i3-90 COLLAR 6-4 5-i8-9e COLLAR t2-2t 5"t2-9~ PERF RECORD J3-Je 3-25-9e TRACER CHECK t5-2 5-~4-9e COLLAR ~7--'7 4-6-9e F'ERF i8-ii 5-i3-9~ F'DK-iee G/R i8-24 5-i2-9e F'DK-iO~ G/R RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN PLEAS RECEI E SIGN AND RETUBIN TH~.~~ED COPY AS RECEIPT OF _. VED BY HAVE A NICE DAY! .~ ~.,L.L. Y HOFFECKER ATO- i 529 AF, PROVED~~'~ I'F(ANS~- 90i 99 I) A i, 5' HAL i, 5" AFl_AS i, 5' HAl._ J, 5" SCH i, 5" A'T'LAS i, 5' ATLAS i , ~" SCH t , 5 · HAl_ i, 5" ATLA~ J, 5' HAL i, 5' ATLAS i, 5' ATLAS TA, DISTRIBUTION · . . CENTRAL FILES ~klEVRON D & M "'lJ'l EXTENSION EXFLORATION EXXON MARATHON MOBIL .PHILLIPS F'B WELL FILES R & D BPX STATE OF ALASKA TEXACO ARCO Alaska, Inc{'*¢~ Prudhoe Bdh, ..:ngineering Post Office Box 100360 AnchOrage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager March 27, 1990 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7, Permit No. 81-66 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Sincerely, D. F. Scheve DFS/MRM/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 17-7)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C, STATE OF ALASKA ALASKa' 'IL AND GAS CONSERVATION c~' IMISSION,~ APPLIC (ION FOR SUNDRY A' PROV b 1. Type of Request: 2. Name of Operator ARCO Alaska, Inc. Abandon -- Suspend Operation shutdown Alter casing Repair well Plugging Change approved program Pull tubing 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1650' FSL, 1909' FWL, Sec. 15, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service Re-enter suspended well Time extension Stimulate X Variance Perforate X Other 6. Datum of elevation(DF or KB) X 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number 81-66 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10790 feet Plugs(measured) 9512 feet Effective depth: measured 10755 feet true vertical 9483 feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 232 sx AS II Surface 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II Production 9891' 9-5/8" 500 sx CI 'G' Liner 1133' 7" 420 sx CI 'G' Measured depth True vertical depth 80' 80' 2687' 2687' 9962' 8742' 10790' 9512' CEIVE Perforation depth: measured 10148-10188'; 10202-10242'; 10257-10267' ,...~;, !;~[:;';, .~ 0 true vertical 8911-8948'; 8961-8999'; 9013-9022' .~:.!~:~ G'ij .& GaS C0~$, Tubing (size, 9rad~, and moasurod d~th) 5-1/2", 17~, L-80 ~ 9580' MD; 4-1/2", 12.6~, N-80, POT tail ~ 9644' MD Pack~m and SSSV (typ~ and m~asumd d~pth) 5-1/2" Camco Bal-0 SSSV ~ 2178' MD; Baker SAB packer ~ 9567' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x.,,, 14. Estimated date for commencing operation March 1990 16. If proposal was verbally approved Oil x Gas Name of approver Date approved Service 17. I hereb~certify that the foregoing is true and correct to the best of my knowledge. _Signed /~~J~ Title Operations Engineering Manager FOR COMMI,~.?,ION U~l= ONLY 15. Status of well classification as: Suspended Date Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ufllG1.NAL SIGNED 8Y LONNIE C. SMITH Approved by order of the Commissioner I Approval No. ~) .--//(~)c~ Commissioner Date Form 10-403 Rev 06/15/88 332 M. R. Morgan SUBMIT IN TRIPLICATE Drill Site 17-07 Sag River and Ivishak Formations Peforating and Hydraulic Fracture Treatment Preliminary Procedure ARCO Alaska Inc. proposes to perforate Prudhoe Bay well 17-07 in the Sag River (10021'MD-10053'MD) and subsequently perform a limited entry fracture stimulation of Sag River and Ivishak formations. The stimulation will be designed to treat the perforation intervals (10021'MD-10053'MD, 10148'MD-10188'MD, 10202'MD-10242'MD, and 10257'MD-10267'MD) within the Sag River sand and Zone 4, Ivishak sand . The preliminary procedure is summarized below. 1. Perforate Sag River at limited shot density. 2. Obtain a valid well test. 3. Pull "live" gas lift valves and replace with dummy valves. Pressure test tubing and casing. 4. Replace spool piece with VCI retrofit choke. 5. Rig up fracturing service company. 6. Pump propped fracture treatment at 40-45 bpm using a dual cross linked water system with approximately 215,000 lbs. of 16-20 proppant. The maximum injection rate possible will be obtained following pressure limitations. The pump schedule is outlined as follows: A. 3000 bbl. cross linked water pad. B. 170 bbl. with 2 ppg. in cross-linked water. C. 170 bbl. with 4 ppg. in cross-linked water. D. 170 bbl. with 6 ppg. in cross-linked water. E. 170 bbl. with 8 ppg. in cross-linked water. F. 170 bbl. with 10 ppg. in cross-linked water. 7. Perform a slickline tag. 8. If necessary rig up CTU and cleanout to PBTD. 9. Open well to flow gradually increasing drawdown to allow proper fracture healing. 10. Install gas lift valves, if necessary. 6 ,5 4 2 C01LED 1UBtNt3 UN]'I' BOP E0U ! PHE N~ 1. ~)00 PSI 7" WELLHEAD CONNECTOR FLAN0£ 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. ~)00 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 4 HIRELINE BOP EOUIPHENT 1. 5000 PSI ?" WELLHEAD CONNECTOR IrLAN(;;[ ~. 5000 PSI WIRELIN£ RAI~S (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, INC~ F'.O. BOX J~68 ANCHORAGE, ALASKA DATE' t0-20-89 REFERENCE' ARCO CASED HOLE FINALS -" 3-20 t0-9-89 F'ERF RECORD =~:=~3-28 8-5-89 F'ERF RECORD '~4-3 t0-t8-89 F'DK-tOO/GR/CCL ~9-t lO-it-89 F'ERF RECORD ~ 9-29 i~-i5-89 F'DK-i~ 9-38 8-6-89 F'IERF RECORD '~ii-ti i0-i6-89 SETTING SVC BRIDGE F'LUG  tt-t5 t0-9-89 CBT ii-iS i0-9-89 CET-CA$ING THICKNE$~ '~"~ it-t5 t0-9-89 CORR. F'ROTECTION EVAL. '~ ti-iS i0-t0-89 ~QUEEZE RECORD ~'~ i-t 5 ~e-t 8-89 TEMF'/GR i 6-28 t e-t 7-89 F'DK-i ee/GR/CCI_ ~ 7-7 ~ e-~ 6-89 PDK-i ee RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN t, i, t, t, i, i, PLEASE ~'IGN AND RETURN THE ATTACHED_ A~'COF"~- RECEIPT RECEIVED BY !. .HAVE A NICE DAY! ATO t 529 '~i;lOho~ag8 APPROVED _ - TRANS'~ 894~8 Of"' DATA. 5' 5' 5' 5" 5' 5" 5' 5' 5' 5' 5' $CH HL~ ATLAS $CH ATLA~ HL,~ ATLAS sJCH ~CH $CH $CH ATLAS Al'LAS DISTRIBUTION CENTRAL FI LE~' ~ ' F'HILLIP$ CHEVRON F'.B WELL FILES D & M R & D EXTEN£ION EXPLORATION ~ ' BF'X EXXON ,,-"'STATE OF ALASKA MARATHON ~~ TEXACO MOBIL ARCO ALASKA, INC. F'.O. BOX JO0360 ANCHORAGE, ALASKA DATE' 9-t 8-89 REFERENCE' ARCO CASED HOLE FINALS i -? 8-23-89 2-4 9-2-89 2-i9 8-24-89 3- t 6 8-25-89 4--5 8-30-89 4- ~ 9 8-29-89 4- J 9 8-30-89 6-t 4 9-t 0-89 ?-i -~ 8-3i -89 t 2-2t 8-30-89 i,~-~- '"'~,~. 8-3i -89 t 4-20 8-30-89 J4-24 8--3~-89 ~ 4-34 8-30-89 ~6-4 8-t 3-89 t 7-7 5-t 9-89 i 7-t i 5-i 9-89 PRODUCTION PROFILE LEAK DETECTION SURVEY PITS INJECTION PROFILE STATIC TEMF' SURVEY STATIC TEMP SURVEY TEMF' FM COLLAR LEAK DETECTION SURVEY TEMP SURVEY INJECTION F'ROFILE PRODUCTION PROFILE PRODUCTION PROFILE PRODUCTION F'ROFILE LEAK DETECTION LEAK DETECTION LEAK DETECTION RUN t, 5" RUN t, 2" RUN i, i"&5" RUN t, 5" RUN i, 2"&5" RUN t, 2'&5' RUN ~, 2" RUN RUN J, 2'&5' RUN RUN RUN RUN t, 5' RUN t, 5' RUN RUNS RUNS i-3, 5' PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO A'FL. AS CAMCO HR$ CAMCO CAMCO CAMCO CAMCO CAMCO OTIS OTIS RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-i529 CENTRAL FILES CHEVRON ' D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL AF'F'ROVED~__ TRAN$~ 89394 · .. PHILLIPS F'B WELL F']:L.E$ R & D $ BF'X · .. STATE OF ALA,S'KA ~' TEXACO ARCO Alaska, Incf Prudhoe B~I~ .,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineeri'ng Manager August 9, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7, Approval No. 9-555 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/TPA/jp Attachment cc: J. S. Dietz, BP J. Gruber, ATO-1478 PI(DS 17-7) W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C ALASK/~ STATE OF ALASKA L AND GAS CONSERVATION CJ~ AISSION REPOR'F SUNDRY WELL OP,_RATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 5. Type of Well Development Exploratory StratJgraphic 6. Datum of elevation(DF or KB) 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number/approval number 81-66/9-555 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured 10790 feet Plugs(measured) true vertical 9515 feet Effective depth: measured 10755 feet true vertical 9482 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 232 sx AS II 80' 80' Surface 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II 2687' 2687' Production 9891' 9-5/8" 500 sx CI 'G' 9962' 8742' Liner 1133' 7" 420 sx CI 'G' 10790' 9515' Perforation depth: measured 10148-10188'; 10202-10242'; 10257-10267' true vertical 8911-8948'; 8961-8999'; 9013-9022' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 9580' MD; 4-1/2", 12.6~, N-80, PCT tail @ 9644' MD Packers and SSSV (type and measured depth) 5-1/2" Camco Bal-0 SSSV @ 2178' MD; Baker SAB packer @ 9567' MD 13. Stimulation or cement squeeze summary F~ j~'~' ~ i'V' E D Intervals treated(measured) See attachment AUG Treatment description including volumes used and final pressure Representative Daily Averaee Produ~ion or Injemion Data ~' ~Aneh°rag~ubing OiI-Bbl Gas-Mcf Water-Bbl Casing Press Pressure Prior to well operation 2546 3883 923 -- 278 Subsequent to operation 2571 4572 873 -- 283 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~~,,~~,,4~~~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 137 T. P. Allen, 263-4837 SUBMIT IN DUPLICATE TREATMENT: OBJECTIVE: INTERVALS: Drill Site 17-7 Description of Work Performed Scale Inhibitor Treatment To Inhibit Calcium Carbonate Scale in Zone 4 10148-10188', 10202-10242' and 10257-10267' MD 6/4/81) TREATMENT DATE: July 21, 1989 1. Obtained a valid well test. 2. ,, Fluid packed the 5-1/2 x 9-5/8" annulus with dead crude/diesel. (Ref. BHCS Loaded 50 bbls of filtered fresh water for blending the EDTA. Loaded 281 bbls of filtered 2% NaCI water for blending the scale inhibitor. 4. Flushed pumper with 2 bbls of filtered fresh water. 1 Si Mixed the remaining 2000 gals. (48 bbls) of filtered fresh water and added 1550 lbs of Na2EDTA with additives. Flushed pumper with 2 bbls of filtered 2% NaCI water and mixed one of the current acceptable amine phosphonate inhibitor blends. 7. Loaded 400# of solid OSR diverter and 35 gals of liquid OSR diverter. 1 Si 10. 11. 12. Loaded 30 bbls of methanol, 85 bbls of diesel, and 450 bbls of 2% NaCI water w/1000 mg/I of DETPMP. Batch mixed the 48 bbls of EDTA with 400# of solid diverter and 35 gals of liquid diverter. MIRU pump trucks and transports. Pumped the following fluids down the production tubing: A1 B. C. D. E. F. G H. 30 bbls of diesel 32 bbls of methanol 51 bbls of EDTA w/additives and the solid and liquid diverter 292 bbls of scale inhibitor blend 459 bbls of 2% NaCI water w/1000 mg/I of DETPMP 50 bbls of diesel 235 bbls of dead crude 10 bbls of diesel RD and release equipment. Shut in well for 2 hrs. After this period of time returned well to production. 13. Obtained a valid well test. ARCO Alaska, Inc. J Prudhoe Bay~' .-ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 21, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7, Permit No. 81-66 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/jp Attachment T. B. Gray, BP J. Gruber, ATO-1478 PI(DS 17-7)W1-3 RECEIVED LlUN 2 6 I989 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichlieldCompany AR3B--6132-C STATE OF ALASKA ALASK,~r'~ L AND GAS CONSERVATION C~' MISSION APPLICA I'ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown ~ Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approved program Pull tubing Variance Perforate Other 5. Type of Well Development X Exploratory Stratigraphic Service 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 6. Datum of elevation(DF or KB) 71 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number 81-66 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10790 feet Plugs(measured) 9515 feet Effective depth: measured 10755 feet true vertical 9482 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 232 sx AS II 80' 80' Sudace 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II 2687' 2687' Production 9891' 9-5/8" 500 sx CI 'G' 9962' 8742' Liner 1133' 7" 420 sx CI'G' 1.~7.9.0'_.,,, . _ -q515' Perforation depth: measured 10148-10188'; 10202-10242'; 10257-10267' ~UN 2 ~ i989 Alaska 0ii & Gas Cons. Commission' true vertical 8911-8948'; 8961-8999'; 9013-9022' Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 9580' MD; 4-1/2", 12.6#, N-80, PC tail @ 9644' MD Packers and SSSV (type and measured depth) 5-1/2" Camco Bal-0 SSSV @ 2178' MD; Baker SAD packer @ 9567' MD 13. Attachments Description summary of proposal x Detailed operations program ..... BOP sketch x 14. Estimated date for commencing operation I June 1989 16. If proposal was verbally approved Oil x Gas ..... Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed 2~-~, ~.~~Z~'~_~-' Title 15. Status of well classification as: ..... Suspended Operations Engineering Manager Date FOR COMMISSION URI= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test . Location clearance Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED BY LONNIE C. SMITH .... Approved by order of the Commissioner Commissioner I Approval No. ~, _.,,.~--.~,~,,,~,-- ApproVed Copy I~eturr~ed Date Form 10-403 Rev 06/15/88 073 T. P. Allen, 263-4837 SUBMIT IN TRIPLICATE Drill Site 17-7 Scale Inhibition Treatment ARCO Alaska, Inc. proposes that a scale inhibition treatment be performed on Well 17-7. treatment will be performed as follows: 1. Obtain a valid well test. 2. . . . . . . . The 10. 11. 12. 13. Perform a fluid level survey on the 5-1/2 x 9-5/8" annulus. Fluid pack the 5-1/2 x 9- 5/8" annulus with dead crude/diesel. Load 50 bbls of filtered fresh water for blending the EDTA. Load 281 bbls of filtered 2% NaCl water for blending the scale inhibitor. Flush pumper with 2 bbls of filtered fresh water. Mix the remaining 2000 gals. (48 bbls) of filtered fresh water and add 1550 lbs of Na2EDTA with additives. Flush pumper with 2 bbls of filtered 2% NaCl water and mix one of the current acceptable amine phosphonate inhibitor blends. Load 400# of solid OSR diverter and 35 gals of liquid OSR diverter. Load 30 bbls of methanol, 85 bbls of diesel, and 450 bbls of 2% NaCI water w/1000 mg/I of DETPMP. Batch mix the 48 bbls of EDTA with 400# of solid diverter and 35 gals of liquid diverter. MIRU pump trucks and transports. Pump the following fluids down the production tubing: A. 30 bbls of diesel B. 30 bbls of methanol C. 48 bbls of EDTA w/additives and the solid and liquid diverter D. 285 bbls of scale inhibitor blend E. 450 bbls of 2% NaCI water w/1000 mg/I of DETPMP F. 50 bbls of diesel G 240 bbls of dead crude H. 5 bbls of diesel RD and release equipment. Shut in well for 2 hrs. After this period of time return well to production. Obtain a valid well test. Contact the Drill Site Engineer (J. Y. Julian, x1516) concerning any questions about the well test. 6 5 4 3 2 COILED TUBINg UNIT BOP EOUI PMEN7 1. 5000 PSI 7" WELLHEAD CONN£CTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYD~LIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 3 2 Alaska 0il & Gas Cons. Anchorage H]RELINE BOP EOUIPMENT 1. 5000 PSI 7" WELLHEAD CONNECIOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO Alaska, Inc.~ Prudhoe Ba~ _,,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 21, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7 Approval No. 9-347 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Very truly Yours, D. F. Scheve DFS/TPA/jp Attachment CC: T. B. Gray, BP J. Gruber, ATO-1478 PI(DS 17-7) W1-3 RECEIVED UUN 2 6 1989 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASK r "IL AND GAS CONSERVATION 1MISSION REPORTOF SUNDRY WELL OP=RATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging · Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 5. Type of Well Development Exploratory Strafigraphic 6. Datum of elevation(DF or KB) 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number/approval number 81-66/9-347 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10790 feet Plugs(measured) 9515 feet Effective depth: measured 10755 feet true vertical 9482 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 232 sx AS II 80' 80' Surface 2616' 13-3/8" 3000 sx Fondu & 850 sx PF II 2687' 2687' Production 9891' 9-5/8" 500 sx CIG 9962' 8742' Liner 1133' 7" 420 sx CIG 10790' 9515' Perforation depth: measured 10148-10188'; 10202-10242'; 10257-10267' true vertical 8911-8948'; 8961-8999'; 9013-9022' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 9580' MD; 4-1/2", 12.6g, N-80, PC tail @ 9644' MD Packers and SSSV (type and measured depth) 5-1/2" Camco Bal-0 SSSV @ 2178' MD; Baker SAB packer @ 9567' MD 13. Stimulation or cement squeeze summary R E t~ i~ iV E D " 14. Intervals treated(measured) See attached Treatment description including volumes used and final pressure Prior to well operation Subsequent to operation UUN 2 1989 Alaska 0il & Gas Cons. C0m,rn/ss,/0tl Representative Daily Average Production or In!action Data Anchorage OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure 1968 4878 595 -- 242 2810 5665 968 -- 242 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil ~ Gas _._ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~_ ~yy'~~ ~f/C.~//~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 071 T. P. Allen, 263-4837 Drill Site 17-7 Description of Work Performed TREATMENT: Diverted Mud Acid Stimulation Treatment OBJECTIVE: To Stimulate Zone 4 INTERVALS: 10148-10188', 10202-10242' and 10257-10267' MD (Ref. BHCS 6/4/81) TREATMENT DATE: May 14 to May 21, 1989 1. Performed a tubing wash with 2440 gals of 15% HCL, 250 gals of xylene and 0.4% corrosion inhibitor. Pumped down the production tubing as follows: 2690 gals of 15% HCL/Xylene 165 bbls of crude 2. Flowed the well back to the system. 3. Obtained a wellhead fluid sample from Well 17-7 and performed emulsion and sludging tests with the acids and additives. 4. Obtained a valid well test. . MIRU wireline unit. Changed out the live GLVs to dummy GLV. Loaded the 5-1/2 x 9-5/8" annulus with dead crude/diesel to surface. Pressure tested annulus to 2000 psi to ensure no communication exists. 6. Loaded 7000 gals of 12% HCL and 7000 gals of 6% HCL - 1.5% HF mud acid. 7. Loaded 7000 gals of 2% NH4CL water. Loaded 1000 gals of xylene and 350 bbls of slick diesel. . MIRU pump trucks and transports. Ensured that 2500 psi is placed on the 5-1/2 X 9-5/8" annulus. 9. Rolled all acid compartments on location before pumping fluids downhole. 10. Pumped the following fluids down the 5-1/2" tubing: 11. 12. A. 5 0 bbls B. 1000 gals C. 3020 gals D. 3020 gals E. 3020 gals F. 4030 gals G 4030 gals H. 4030 gals I. 240 bbls Slick diesel to establish treating rate and pressure Xylene 12% HCL w/additives 6% HCL & 1.5% HF mud acid w/additives, and 100 ball sealers 2% NH4Cl with 10#/1000 gals of gel and 200 ball sealers 12% HCL w/additives and 300 ball sealers 6% HCL & 1.5% HF mud acid w/additives and 150 ball sealers 2% NH4Cl with 10#/1000 gals of gel Slick Diesel Immediately following the treatment, unloaded the well. R E After all stimulation fluids have been recovered, obtained a valid well t~ Alasl(a Oil & Gas Cons. C0n~r~iss,i0~ Anchorage ARCO Alaska, Inc. ~. Prudhoe Bay ~En~gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager May 1 , 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7, Permit No.81-66 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 17-7)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASKA{i~' L AND GAS CONSERVATION CC(' ,41SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approved program Pull tubing Vadance Perforate Other 5. Type of Well Development Exploratory Stratigraphic 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T1 ON, R15E, UM At top of productive interval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM At effective depth At total depth 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 6. Datum of elevation(DF or KB) 71 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 17-7 9. Permit number 81-66 10. APl number 50 - 029-20596 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10790 feet 9515 feet Effective depth: measured 10755 feet true vertical 9482 feet Length Size Casing Structural Conductor Sudace Intermediate Production Liner Perforation depth: Plugs(measured) RECEIVED Junk(measured) AlasFa 0il & ~as Cons, Cemented ~ ~ '_~O~d depth 80' 20" 2616' 13-3/8" 232 sx AS II 80' 3000 sx Fondu & 850 sx PF II 2687' 9891' 9-5/8" 500 sx Cl G 1133' 7" 420 sx CIG measured 10148-10188'; 10202-10242'; 10257-10267' True vertical depth 80' 2687' 9962' 8742' 10790' 9515' true vertical 8911-8948'; 8961-8999'; 9013-9022' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 9580' MD; 4-1/2", 12.64t, N-80, PC tail @ 9644' MD Packers and SSSV (type and measured depth) 5-1/2" Camco Bal-0 SSSV @ 2178' MD, Baker SAB packer @ 9567' MD 13. Attachments Description summary of proposal x~ Detailed operations program m BOP sketch X. 14. Estimated date for commencing operation May 1989 ' 16. If proposal was verbally approved Oil x Name of approver Date approved Service 17. I hereby,qertify that the foregoing is true and correct to the best of my knowledge. .Signed:j~~~~~ Title 15. Status of well classification as: Gas Suspended Operations Engineering Manager FOR COMMI~ION Ll.~l= ONLy Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- . Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH Form 10-403 Rev 06/15/88 Date '~/r? I Approval No. ,~ ~.,.~'<~ ~ Approved Copy SUBMIT IN TRIPLICATE 017 T. P. Allen, 263-4837 Drill Site 17-7 Mud Acid Perforation Breakdown Treatment ARCO Alaska, Inc. proposes that a perforation breakdown treatment using mud acid be performed on Well 17-7. The treatment will be performed as follows: 1. Perform a tubing wash with 2500 gals of 15% HCL, 250 gals of xylene and 0.4% corrosion inhibitor. Pump down the production tubing as follows: 2750 gals of 15% HCL/Xylene 165 bbls of crude 2. Flow the well back to the system. 3. Obtain a wellhead fluid sample from Well 17-7 and perform emulsion and sludging tests with the acids and additives. 4. Obtain a valid well test. . MIRU wireline unit. Tag bottom to ensure that fill is not covering the perfs. Change out the live GLVs to dummy GLV. Load the 5-1/2 x 9-5/8" annulus with dead crude/diesel to surface. Pressure test annulus to 2000 psi to ensure no communication exists. 6. Load 7000 gals of 12% HCL and 7000 gals of 6% HCL - 1.5% HF mud acid. 7. Load 7000 gals of 2% NH4CL water. Load 1000 gals of xylene and 350 bbls of slick diesel. 8. MIRU pump trucks and transports. Ensure that 2500 psi is placed on the 5-1/2 x 9-5/8" annulus. 9. Roll all acid compartments on location before pumping fluids downhole. 10. Pump the following fluids down the 5-1/2" tubing: ~ 50 B. 1000 ~ 3000 D. 3000 E 3000 F. 4000 G 4000 H. 4000 I. 300 bbls Slick diesel to establish treating rate and pressure gals Xylene gals 12% HCL w/additives gals 6% HCL & 1.5% HF mud acid w/additives, and 100 ball sealers gals 2% NH4Cl with 10#/1000 gals of gel and 200 ball sealers gals 12% HCL w/additives and 300 ball sealers gals 6% HCL & 1.5% HF mud acid w/additives and 150 ball sealers gals 2% NH4Cl with 10#/1000 gals of gel bbls Slick Diesel 11. Immediately following the treatment, unload the well. 12. After all stimulation fluids have been recovered, obtain a valid well test. ~!aska 0il .& Gas Cons. 6 5 4 3 2 COILED TUBING UNIT BOP EI)U l PMEN~ 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PiPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 H]REL]NE BOP EOUIPHENT I I I I IIII 1. 5000 PSI ?" W£LLHEAD CONNECIOR IrLANG[ 2. 5000 PSI WIRELIN[ RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO Alaska, Inc.J~ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 7, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7 Approval No. 8-298 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Ver~ truly yours, D. F. Scheve DFS/JMV/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 PI(DS 17-7)W1-3 WELLS2/125 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM ..,ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown - Stimulate,X, Plugging -' Perforate - Pull tubing Alter Casing ~ Other 2. Name of Operator ARCO Alaska, T~c 3. Address P.O. Box 100360, Anchorage, AK 99510 Location of well at surface 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM Attop ofproductiveinterval 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM Ateffective depth Attotaldepth 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 5. Datum elevation (DF or KB) 71' RKB Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 17-7 8. Approval number 8-298 9. APl number 50-- 029-20596 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured '10790 true vertical 9515 Effective depth: measured 10755 true vertical 9482 Casing Length Size Conductor 80' 20" Surface 2616 ' 13-3/8" Production 9891 ' 9-5/8" Liner 1133 ' 7" feet feet feet feet Plugs (measured) Junk (measured) Cemented Measured depth 232 sx AS II 80' 3000 sx Fondu & 2687' 850 sx PF II 500 sx C1 G 9962' 420 sx Cl G 10790' ~ue Verticaldepth 80' 2687' 8742' 9515' Perforation depth: measured 10148-10188' 10202-10242' true vertical , 10257-10267' 8911-8948' 8961-8999' 9013-9022' Tubing (size, grade and measured depth) 5½", 17#, L-80 @ 9580' MD; 42 , 12.6#, N-80, PC tail @ 9644' MD Packers and SSSV (type and measured depth) ~t, ll ,'~ I J-2 , ~amco Bal-0 SSSV @ 2178', Baker SAB packer @ 9567 M~¢~ . 12. Stimulation or cement squeeze summary 'Intervals treated (measured) See Attached Treatment description including volumes used and final pressure 13. Prior to well operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 4800 3360 50 -- Tubing Pressure 32O Subsequent to operation 4400 3080 50 320 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed f~'~/'~z~~~.~ Title Operations Engineering Manager Date Form 10-404 Rev. 12-1-85 WELLS2/125 J. M. Vitucci, 265-6358 Submit in Duplicate DRILL SITE 17-7 AMINE PHOSPHONATE SCALE INHIBITION TREATMENT ARCO Alaska Inc. performed the following scale inhibition treatment on Well 17-7 on 4/30/88: · 1. Obtained a valid well test. 2. Fluid packed the 5-1/2" x 9-5/8" annulus with crude. 3. MIRU pump trucks and transports. 4. Pumped the following fluids: B. C. D. D. E. 5. Shut in well for 12 hrs. RD and released equipment. 6. Returned well to production following 12 hr shut-in period. 7. Obtained a valid well test. 48 bbls of EDTA w/additives and 800 lbs of solid OSR/125 gals of liquid OSR 120 bbls of scale inhibitor blend 195 bbls of diesel 420 bbls of diesel w/10% EGMBE 238 bbls of dead crude 12 bbls of diesel ANCHOR. AF.,E.. AI..A,~KA 995t G DATE: ..%-24-BB R'F..FERENC.E: ARCO CA.~;ED HFI..I_E FINAl.. 9-26 . -,_0-88 PDK-t O0/r;AMMA RA~-;..[,I.. '~"-4'7:"7''::~:;~ 5-~ 9-8D Pr)E-1GG/[,AMMA RAY-C£1... R'I.IH t. '5 · RI..IKI t: %" PI,EA..g'F. ..g'I~N ~J!) REI'I..IIR'N THE ATTACHED C..OF'Y A.~ RE[:F.T.F'T OF I')AI'A.. ........ - I--I~vE A i,,I]~CF-. I)~.~",', ~L18~.i~8 Oil & Gas Cons. COilll~l{~Ch,~,[ PE[,I;Y 1F~FNNFI'I' Allcliorage O .T..~."r t:;~ .T BLIT '[ I;.IN '"',,.fi E N 1' !:;,' ¢~. I. F 1'...I... I':". ,,c' '"- [: 14 E V ~' ltl N · ~. . F X' 'l' F [,J Y, TI fi ~,~ E '~ l::' I... ('1 [;: ~'r T fTI -,. · se. ,. M ~;:', I::~ ~, T !.-I [) N '"' M I'i i.i ]~ I DATF · !-?F-FERFNF.'.F: ARCO HC~F.,NEI'Tr, I'~F'E,~ I~I/!.T~I'TNI; F'!. F~XF-. ,~T(.';N .~nND I;'F'fllIN:N ~l-¢'f~.~J'l[,r:l'tF~ f:i'}F'Y ~.,': F:Fr. FTF'T l:~' J::' f: l":-' 1~ VF'D P,Y ..... :'_L~.~J.......,,-..,,, " 1.4,:.,, v F:; ,.~ N T n F' D,~ ',' ' ~..,.~.Oil & Gas Cons. Commissfr!-... ADchor~.,q.e I::' F:' f.; f';, Y ?, F' ~-.!. N F!: '1[' 'f' ¢:; 'f' Fi --- t ":".: ? (~ T) TI' :~: T F;: 'f T:{! I 'f' T fl N R'I Ih, I t ARCO Alaska, Inc. ( Prudhoe Bay~,,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 20, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 17-7 Permit No. 81-66 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JMV/jp At t a chment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 17-7)W1-3 RECEIVED APR 2 2 Naska 0il & Gas Cons. Commission Anchorage WELLS2/125 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM .,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend :~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing LC Time extension [] Change approved program [] Plugging [] Stimulate ]~ Pull tubing [] Amend order [] Perforate [] Other [] 2. Name of Operator ARCO Alaska, Inc, 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 2242' FNL, 930' FWL, Sec. 22, TiON, R15E, UM 5. Datum elevation (DF or KB) 71' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 17-7 feet At top of productive interval 1500' FSL, 1734' FWL, Sec. At effective depth At total depth 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 15, T10N, R15E, UM 8. Permitnumber 81-66 9. APInumber 50-- 029-20596 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 10790 feet 9515 feet Plugs (measured) Effective depth: measured 10755 feet true vertical 9482 feet Junk (measured) Casing Length Size Surface 112' 20" Intermediate 2616' 13-3/8" Production 9891' 9-5/8" Liner 1133' 7" Cemented 275 sx PF I 2300 sx Fondu & 400 sx PF 500 sx C1 G & 300 sx PF I 400 sx C1 G Measured depth 112' 2687' 9962' 10790' WueVerticaldepth 112' 2650' 8687' 9491' Perforation depth: measured 10148-10188 ' 10202-10242 ' 10257-10267 ' true vertical 8911-8948', 8961-8999', 9013-9022' Tubing (size, grade and measured depth) 5~" 17~f L-80 PCT @ 9580' MD; 4~" 2 , ~ , , Packers and SSSV (type and measured depth) 5q", Camco Bal-0 SSSV @ 2178' , BAker SAB packer @ 9567' MD 12.Attachments Description summary of proposal [] Detailed operations program RECEIVEO APR 2 2 1988 12 6¢/ N-80 PCT tail @ 9644'A~kaOil&Gasc°ns'commissi°~ · , , Anchorage BOP sketch [] 13. Estimated date for commencing operation April 1988 14. If proposal was Verbally'approved Subsequent Work Reported on ~. Name of approver Form No.~Dated.~/~~ Date approved 15.1here~certifst~t~e~;egoingis~/./.._ true and correct to the best of my knowledge Signed ~",~~~~ Title Operations Engineering Manager Commission Use Only Date Conditions of approval Approved by Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI Approved Copy · .:ORIGINAL SIGNED BY Returned - LONfl!E C. SMITH o/_/j~ 7-' ~Y' Form 10-403 Rev 12-1-85 WELT,S2/125 Commissioner J. M. Vitucci, 265-6358 ~¢'?~ by order of the commission Date " Submit in triplicate DRILL SITE 17-7 AMINE PHOSPHONATE SCALE INHIBITION TREATMENT 1. Obtain a valid well test. 2. Fluid pack the 5-1/2" x 9-5~8" annulus with crude. 3. MIRU pump trucks and transports. 4. Pump the following fluids: A. 48 bbls of EDTA w/additives and 800 lbs of solid OSR/125 gals of liquid OSR B. 120 bbls of scale inhibitor blend C, 600 bbls of diesel D. 240 bbls of dead crude E. 5 bbls of diesel 5. Shut in well for 12 hrs. RD and release equipment. 6. Retqrn well to production following 12 hr shut-in period. 7. Obtain a valid well test. RECEIVED APR 2 2 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: May 2, 1985 Reference: ARCO Pressure Data 14-35 Static Gradient 4-3-85 16-4 Static Gradient 4-18-85 16-12 Static Gradient 3-11-85 ~~ Flowing Gradient 4'-8-85 Camco Camco Camco Camco Please sign as receipt ~f data. Received by / /L/~' ' i¥i'~'~'0 ~ ' Al~,:~-z ~i! ~ %ss Cc:ns. C,~mmis$ion Pam Lambert ATO 1429C Trans 087 Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio .State.of Alaska Texaco ARCO Alaska, Inc.(~' Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer July 9, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 17-1 DS 17-2 DS 17-5 DS 17-7 DS 17-9 Permit No. 80-55 permit No. 80-70 Permit No. 80-96 Permit No. 81-66 Permit No. 81-90 Enclosed are the Completion Reports for work done on the above mentionedwells. Very truly yours, D. F. Scheve DFS/WT/lmh Enclosures CC: SOHIO Alaska Petroleum Co. File Pi(DS 17-1)W4-3 File PI(DS 17-2)W4-3 File Pi(DS 17-5)W4-3 File Pi(DS 17-7)W4-3 File PI(DS 17-9)W4-3 RECEIVED J U L ! 6 984 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc.'it a Subsidiary of AtlanllcRIchfleldCompany ALASK4" ,'L AND GAS CONSERVATION C tMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG L 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-66 3. Address 8. APl Number P.O. Box 100360~ Anchoras;e~ Alaska 99510 50-029-20596 4. Location of well at surface 9. Unit or Lease Name 2242' FNL, 930' FWL, Sec 22, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1500' FSL, 1734' FWL, Sec 15, T10N, R15E, UM DS 17-7 At Total Depth ~,~¢ 11. Field and Pool f~ FSL, ~' FWL, Sec 15, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0il Pool 71' RKBI ADL 28331 12. Date Spudded 13. Date T.Do Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 5/17/81 6/4/81 6/11/81I __ feet MSL 1 17. TotalDepth(MD+TVS) 18. Plug Back Depth (MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set 121. Thickness of Permafrost 10790' MD ~;~f~ 10755' MD YES]~ NO [] 2178 feet MD 1900' (_apprOX) 22. Type Electric or Other Logs Run DIL/BHCS/GR. FDC/CNL/GR: CNL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE ITOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED I q-R/R- 79~4~ k]-R~q RL~r¢., 2¢,R7' 17k-,, ~nnn o,, ~,,~,, , ~cn _-x PF II 7" 9.9~ T,-Rf) q6c~7, 1RTq~, R~" ;.on ,-z ~1 ,°o ¢,_ cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) *New Perfs w/4Spf SIZE DEPTH SET (MD) PACKER SET (MD) 10148 - 10188'MD (40') 8914- 9026' TVD . 5~" 96/:/:' 9558' 10202 - 10242'MD (40') *10257 - 10267'MD (10') 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. ' · ' DEPTH INTERVAL (MD) ~AMOUNT& KIND OF MATERIAhUSED 'IX*l* / A " . ' ', · , . ' '" ~i ";!'~; ' ~" , : '. ,, ! , 27. PRODUCTION TEST Date First Production j I~lethod'o~:Operation (FlOwing, gas lift, etc.) : . ,,. ' ,' 3/13/82J Flnw~ng ';' ~'::' ~' ' ' : · " ' Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 6/'lo/R& 6' 1 TEST' PERIOD e' '!058: ' :106! 'f~ /45 I002 FIowTubJng ! Casing Pressure CAL.CULA~FED -~ OIL,BBL'. · GAS;MCF" WATEI~-BB;L ' OIL GRAVITY-APl (Corr) Press. Bg4 24-HOUR RATEI~ :":&l~q: : '; :""'/,I?R ¢i " 9& /, 28. CORE DATA " --' ' Brief description of lithology, porositY, fractures, apparent dips and presence of oil, gas or water. Submit core chips. - , ,. ~/A ' : 'RECEIVED AlaSka Oil & GaS Cons, OOmmiS$io. , Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE "' · . -, ' 30... GEOLOGIC MARKERS ,~OR;?'.~; '::7 ;, "" :; ~ :': NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 10133' 8897' O/W Contact 10341' 9092' Base Sadlerochit 10694 9425 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed 7~~~~ Title Regiona 1 Engineer Date 7/~///~//' / / INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types o'f lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item .5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so.state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc.~ t~'~ Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 25, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 17-1 DS 17-2 DS 17-5 DS 17-7 DS 17-9 Permit No. 80-55 Permit No. 80-70 Permit No. 80-96 Permit No. 81-66 Permit No. 81-90 Attached are "Subsequent Report" Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments cc: Sohio Petroleum File Pi(DS 17-1)Wl-3 Pi(DS 17-2)W1-3 P1 (DS 17-5)W1-3 Pi(DS 17-7)W1-3 Pi(DS 17-9)Wl-3 RECEIVED J U N 2 8 1984 Alaska Oil & (~as Cons, Commission Anchorage ARCO Alaska, Inc. Is a Subsidiary of AllantlcRIchfleldCompany , f STATE OF ALASKA ~- ALASKA . ~.AND GAS CONSERVATION C ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL~ OTHER [] 2. Name of Operator 7. Permit Nd. ARCO Alaska, Inc. 81-66 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well ($urt~ace) 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM (Producing Interval) 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM (Total Depth) 1711' FSL, 1844' FWL, Sec. 15, T10N, R15E, UM 5. Elevation in feet (indicate t<B, DF, etc.) 71' RKB 6. Lease Designation and Serial No. ADL 28331 8. APl Number 50-- 029-20596 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 17-7 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ]~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 5/25/84. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 10257 - 10267' MD (4spf), flowed well to clean up. Shut-in well, POOH, all shots fired. Ran SSSV, secured well, RD. Ref: BHCS 6/4/81 RECEIVED 'JUN2 81984 ~.~asKa 0il & Gas Cons. C0mmlssi0. Anchorage 14.1hereby~ify that ~,~,~go~,~s t~nd correct to the best of my knowledge./,] Regional Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc?( Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 June 6, 1984 Reference: ARCO Cased Hole Finals D.S. 1-26j 5-17-84 D.S. 2-17J/ 5-12-84 D.S. 4-1 5-6-84 D.S. 5-8-' 5-5-84 D.S. 6-18~. .... 5-22-84 D.S. 9-4~/ 5-7-84 D.S. 9-6-/ 5-7-84 D.S. 12-17/ 5~14-84 D.S. 12-23/ 5-16-84 D S 13-34,/_ 5-17-84 · · / 5 'DS. 17-10 5-18-84 D.S. 17-10 '~ 5-18-84 D.S. 18-~ 5-14-84 Collar/Perf Log Run 1 5"'GO Collar Log to set Casing Patch Run 1 5" GO CN/MSN/GR CN/MSN/GR CPL/TDT-M w/listing CN/MSN/GR CH CNL CPL/TDT-m w/listing Run 2 5" DA Run 1 5" DA 5" Sch Run 1 5" DA Run 1 5" GO 5" Sch X-Y Caliper Log w/Borehole Volume Run 1 5" GO CPL/TDT-M w/listing CH DIL Collar/Perf Log Collar/Perf Log CET Log CCL/Perf Record Temperature Log 5" Sch . Run 12 5" Sch Run 1 5" GO Run 1 5" GO Run 1 5" Sch Run 1 5" Sch Run 1 5" GO  /~ase sign and return the attached copy as receipt of data. Be .PATRIOTIC! - Hang out your flag on the 14th. Kelly McFarland ATO-1429F Trans. 9231 DISTRIBUTION 'Chevro~ D&M Drillin$ Exp. Services Ext. Exploration Exxon C~y ~ara~hon "~" 0,/ ' ' Phillips "::-;:' ,.-';. ..... Prudhoe Bay Well'"Files . ,' ,,, - .~,~,;/.,,~. .... "'- '""'/~"'~'/~/7 R&D Carolyn Smith · State of Alaska ARCO Alaska, Inc~r Prudhoe Ba~ .-ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer April 2, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 17-1 DS 17-2 DS 17-5 ii, DS 17-7 DS 17-9 Permit No. 80-55 Permit No. 80-70 Permit No. 80-96 Permit No. 81-66 Permit No. 81-90 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments cc: Sohio Petroleum File P1 (DS 17-1)W1-3 Pi(DS 17-2)W1-3 PI(DS 17-5)W1-3 P1 (DS 17-7)W1-3 P1 (DS 17-9)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlsntlcRIchfieldCompany ALASK(' ¢ STATE OF ALASKA ~" _ ~ AND GAS CONSERVATION ~( ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL~ OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 81-66 3. Address 8. APl Number P.O. BOX 100360, Anchorage, Alaska 99510 50- 029-20596 4. Location of Well 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM 1500' FSL, 1734' FWL, Sec. 15, T10N, R15E, UM 1711' FSL, 1844' FWL, Sec. 5. Elevation in feet (indicate KB, DF, etc.) 71' RKB 12. 15, T10N, R15E, UM I 6. Lease Designation and Serial No. ADL 28331 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 17-7 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 17-7 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 10257-10267' MD Ref: BHCS 6/4/81 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed .... _ r Title Regional Engineer The space below for Commission use Date Conditions of APproval, if any: Approved Copy By Order of Approved by COMMISSIONER the Commission Form 10-403 Rev. 7,1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Anchorage, Alaska 99510 Telephone 90-7 -"7' 5637 August 5, Reference: 1982 Arco Pressure Data D.S. 1-6 1-23/25-82 ,D. S. 15-14 6-28-82 D.S. 17-7 . 4-28-82 Pressure Survey Pressure Gradient Survey Pressure Survey Please sign and return the Kelly McFarland Trans. # 343 attached copy as receipt of data. D !'STR. IBIITION:" NORTH GEOLOGY ,. EXXON ? R&D MOBIL DRILLING GETT~ PEILLIES~ D&~ $OEIOU GEOLOG~' MARA/~ON' c~Ew. 0N STATE. OF ALASKk ARCO Alaska, Inc.'~"(~ Post OfficeB(~×' 360 Anchorage, Alaska 99510 Telephone 907 277 5637 June 30, 1982 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' DS 17-7 (Revised Well Completion Report) Dear Mr. Chatterton: Enclosed is a revised completion report for DS 17-7. The original completion report, dated September 17, 1981, incorrectly l i~.ts the BHL as: 1711' FSL, 1844' FWL, Sec. 15, TION, R15E, UM The correct location is: 1650' FSL, 1909' FWL, Sec. 15, TION, R15E, UM Sincerely, J. Gruber Associate Engineer JG:llm Enclosure cc: M. Kellis, AFA 403 R. W. Crick, ANO 912 G. Arnold, ANO 927 Op. Engr. Coord., PBOC 103 Well File GRU1/L39 RECEIVED J U L - 5 1982 A~tska Oil & Gas Cons. Corr~misslon ~nchorag~ ARCO Alaske, inc. is a subsidiary of AtlanticRichfieldCompany ALASKA .. L AND GAS CONSERVATION C .~IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL)~l~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-66 3. Address 8. APl Number P. O. Box 2,60, Anchorage, AK 99510 50- 029-20596 4. Location of well at surface 9. Unit or Lease Name 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1500' FSL, lY2,4' FWL, Sec. 15, T10N, R15E, UM DS 17-7 At Total Depth 11. Field and Pool 1650' FSL, 1909' FWL, Sec. 15, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 71 ' RKB ADL 282,2,1 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 05/17/81 06/04/81 06/11/81I N/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionaISurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost 10790'MD,9512'TVD 10755'D, 9482,'TVD YES IX-t NO [] 2178 feet MD 1900' (approximate) 22. Type Electric or Other Logs Run D IL/Sonic/GR, FDC/CNL/GR, CNL/CR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" ~ H-z;U Surf 80' 32" 232sx AS I I 13-3/8" 72# N-80 Surf 2687' 17-1/2" 3000sx Fondu + 850 sx PF II 9-5/8" 47# L-80& Surf 9962' 12-1/4" 500sx Class G cmt S00-95 7" 29# L-80 9657' 10790' 8-1/2" 420sx Class G cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A 5-1/2" 9644 ' 9568 ' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT.& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First ProductiOn Method of Operation (FI0wing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO I TEST PERIOD ~ - Flow Tubing Casing'Pressure CALCULATED.1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (cor'r) Press. 24-HOUR RATE I~' 28. CORE DATA Brief description of lithology, porosity; fractures, apparent dips and presence of oil, gas or water. Submit core chips. None 14on J U L - 6 i982 Alaska 0il & Gas Cons, C0mmJssi0~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Sadlerochit O/W Contact Base Sadlerochit MEAS. DEPTH 10133' 10340' 10694' TRUE VERT. DEPTH 8900' 9093' 9428' Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the bes,t of my knowledge Signed ~~ Title Area Drilling Engr. Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ' Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well. is completed for separate production from more than one interval (multiple completion), so state in itern 16, and in item 24 show the producing intervals for only the interval reported in item 27,. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' AttaChed supplemental records for this well should show the details of any multiple stage cement- ing and the lOcation of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. Post Office Bt ^ 36u Anchorage, Alaska 99510 Telephone 907 277 5637 May 25, 1982 Mr. C.D. Chat Chatterton State of Alaska .Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Subject: ~:-S~.,~ Permit No. 81-66 D.S. 17-8 Permit No. 81-74 D.S. 17-9 Permit No. 81-90 D.S. 17-10 Permit No. 81-97 Enclosed are our Subsequent Sundry Notices · detailing the Work done of the above-mentioned wells. Very truly you_rs, ~. F. Scheve District OPerations 5'.ngineer DFS:TKKW:mlc Enclosures Distribution: Sohio Petroleum Co. RECEIVED MAY 2 71982 Alaska 0il & Gas Cons. Commission Anchorage AlasKa, ~c. is ~ suo:;::~!ary ol AtlanticRichfieldCompany STATE OF ALASKA ALASKA ~_/~NDGASCONSERVATION O ~M SION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [~ OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 360, Anchorage, Alaska 4. Location of Well 99510 2242' FNL, 930' FWL, Sec. 22, T1ON, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 71' RKB 12. I 6 . Lease Designation and Serial No. ADI 2R.8'~1 7. Permit No. 81-66 8. APl Number 50- 029-20596 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 17-7 11. Field and Pool Prudhoe Bay Field PrudhnP 0il Ponl Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations )~( Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 3-11-82. Tested tubing and annulus-tested tree. NU and tested perforating equipment. NU and tested wireline BOP and lubricator. Perforated 10222-42' M.D. with 4 spf. Unloaded to tanks. Flowed to flow station. Perforated 10202-22' M.D., 10168-88' M.D. and 10148-68' M.D. with 4 spf. Recorded BHP. Rigged down perforating equipment. Secured well 3-13-82. MAY 2 7 Alaska Oil & Gas Cons. Commiss~or~ rmchorage Signed The space be _~fr ~:omm ission ;se Conditions o~pproval, if any: the best of my knowledge. Title District Operations Engineer Approved by Form 10-403 Rev. 7-1-80 By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office B,... 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 25, 1982 Mr. C.D. Chat Chatterton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Sub j ect: ~Di~S~i,~iii~~Permit No. 81-66 D.S. 17-8 Permit No. 81-74 D.S. 17-9 Permit No. 81-90 D.S. 17-10 Permit No. 81-97 'Enclosed are Completion Reports for work done on the above-mentioned wells. Very truly yours, ~J F. Scheve District Operations Engineer DFS:TKKW:mlc Enclosu. res Distribution: Sohio Petroleum Co. RECEIVED MAY 2 71982 Oil & Gas Cons. ~mmission /~horage ARCO Af,'~:~ka, Inc. is a subsidiary of AtlantlcRichfieldComPany WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-66 3. Address 8. APl Number P.O. Box 360 Anchorage, AK 99510 50- 029-20596 4. Location of well at surface 9. Unit or Lease Name 2242' FNL, 930' FWL, Sec. 22, TION, R15E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1500' FSL, 1734' FWL, Sec. 15, TION, R15E, UM U.S. 17-7 At Total Depthl~_.-__~ i,~ O°1 '11. Field and Pool ¢-t 1-7:~' FSL,~' FWL, Sec. 15, T10N, R15E, UN Prudhoe Ba:y Field .5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe 0i 1 Pool 71' RKBI ADL 28331 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 5/17/81 6/4/81 6/11/81 --_ feet MSL 1 .17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional SurveY107 90I MD 107551MD YESjJ~ NO[] [ 20' Depth where SSSV set I 21'Thickness°fPermafr°'t2178 feetMD 1900' (approx) 22. Type Electric or Other Logs Run DIL/sonic/GR, FDC/CNL/GR, CNL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surf 80' 3'2" 232 sx AS II 13 3/8" 72# N-80 Surf 2687' 17 1/2" 3000. sx Fondu.:~ 850 sx PF II ' 9 5/8"' '47# L-80& Surf 9962'. .1.2 !/4" 500 SX Class G..cmt S00-95 7" 29# 1-80 9657' 10790' 8 1/2" ..420 sx Class G cmt 24. Perforations open to Production (M.D+TVD of.ToP and Bottom and 25. TUBING RECORD ' .. interval, size and number) SIZE '" DEPTH SET (MD) PACKER SET (MD) 5 1/2" 9644' 9568' 10,148-10168' M.D.?. 10,168-10188' M.D.-~ 26. "'" ACID, FRACTURE, CEMENT SQUEEZE, ETC. . ' 1.0,202-1.0222' M. D ~ DEPTH I,NTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10,222-10242' M.DiJ ' '°3/~I~ "" N/A"':' ' " ' "' 8,914~9002' TVD ,'. 27. PRoDucTION~-ES~" ': :~""" ": ' ' .... Date ,First'Production ' ""' I Method of OperatJo, n (Flowi.n.g, gas lift, etc.) 3-13-82I Flowing ,.~., Date of Test Hours Tested PRODUCTION FOR OIL-BBI. GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO "3-30.~8.2 6.2 : . . TEST PERIOD I~ . 834 · 663, · . ~,0.. 46 ..I 795 . . . Flow',Tubing, Casing Pressure CALCULATED. '1~ OI.L;,BBL GAS-MC'F. '. ~.:- t' WATER-'BBL... . OIL GRAVITY-APl (corr) -Press. 666.' ' ". NA 24-HOUR'RATE. --r ' 3227'."iI.':: 2565 .0 26.4 · : 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. '~ ' r ' N/A , ..... ,, . ,,,. ,, RECEIVED ' "'MAY 2 '? B82 · .. 'Alaska 0il,& Gas 'Cons. Commission Anchorage Form 10-407 SUbmit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. T. Sadlerochit 10133' 8900' Oil/Water 10340 ' 9093 ' B. Sadlerochit 10694' 9428' 31. LIST OF ATTACHMENTS 32. , I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' ,Gas injection, water injection, steam injection, air injection, salt water dispOsal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supp.lemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 Anchorage. Al".~,a 99510 Telephone S: '7 5637 May 13, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.14-30 5/4/82 · D.S.1-8 4/23/82 D~ S' 17-7:~ 4/28/82 ~ D:~S;;i~7-7~.- 4/30/82 Collar & Perforating Log Bridge Plug Tie In Flow Survey Collar & Perforating Log Run 1 5" Run 1 5" Run 1 5" Run 1 5" '~~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 1'61 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY -~ STATE '~,~ OF "ALASKA, ARCO Alaska. Inc. Post Oflice 9~x 360 Anchorage. ka 99510 Telephone 90/ 277 5637 April 12, 1982 Reference: ARCO PRESSURE DATA D.S.16-16 D.S.16-1 D.S.7-2 D.S.2-1 D.S.2-6 D.S.6-1 D.S.6-9 D.S,2-15 D.S.17-9 D.S.2-15 D.S.17-6 D.S.2-i4 DS..6-4 DS..5-11 DoSo5-17 D. S. 17~7', D. S .'17-8 3/10/82 PreSsure Survey 3-12/13-82 " " 3/4/82 " " 2/10/82 '" " 2-7/8-82 " " 1/24/82 " " 2/5/82 " " 1/23/81 " " 3/14/82 " " 1/24/81 " " 6/26/81 " " 11/9/80 " " 3/8/82 " " 2/7/82 " " 2/26/82 " " 3/13/82 " " 3/15/82 " "' ease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #92 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING .GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON CHEVRON STATE OF ALASKA ARCO Alaska, Inc. North Slope D *ct Post Office Bo,, .,60 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer January 29, 1982 Mr. C. D. Chat Chatterton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Subject- D.S. 16-5 D.S. 16-6 D.S. 16-12 D.S. 16-13 D.S. 16'14 D.S. 17-8 D.S. 17-9 D.S. 17-10 Permit No. 81-37 Permit No. 81-51 Permit No. 81-26 Permit No. 81-27 Permit No. 81-32 Permit No. 81-66 Permit No. 81-74 Permit No. 81-90 Permit No. 81-97 Enclosed are our Sundry Notices detailing the work to be done on the above mentioned wells. VerY truly yo,u,.~s L~]. A R°chon JAR.TKKW:ml c Enclosures RECEIVED FEB 0 3 1982 ~aska Oil'& Gas Cons. Commission Anchorage . STATE OF ALASKA '~ ALASKA L AND GAS CONSERVATION C ,,AMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL:~3 OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 81-66 3. Address 8. APl NUmber P.O. Box 360, Anchorage, Alaska 99510 50_029-20596 4. Location of Well 2242' FNL, 930' FWL, Sec. 22, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 71~ R~l~ 6. Lease Designation and Serial No. ADT, 28331 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 17-7 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit i.n Triplicate) (Submit in Duplicate) Perforate ~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment ' [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska proposes to perforate selected intervals within the Sadlerochit Sand for production from the Prudhoe Bay Unit. Upon perforating the well will be flowed to the flow station for clean up and production. ShoUld additional drawdown be necessary to unload the wells it may be flowed to a tank for initial clean up. The perforated intervals will be given in the subsequent report. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to working pressure. - The SSSV will be installed at the conclusion of the perforating and clean up operation. om Form 1~Io. t~-gZ~? Dated FEB 0 3 Z982 . ~laska O~l & Gas Cons Signed14' I hereby certifY7~. "~r-'t~ ~/~'~y~c/-~'-'''-that the fgu;eg~s true / The space below for Commission use and correct to the best of my knowledge. Title D±str±¢t Eng±neer Date Conditions of Approval, if any: Approved by I~RIG HAL SIGNED BY I. BH~IE C. SMITH Approved '?opy Returned By Order of COMMISSIONER the Commisslon Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Oil and Gas Company North Alask strict Post Olfice t,., 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer October 19, 1981 Reference: ARCO MAGNETIC TAPES & LISTS / :.D.S.1142' 9/25/81 . D.S.12-13 ×' 8/31/81 D.S.13-7j 9/27/81 Tape #62204 Tape #62160 Tape #62206 D.S.15-11y 10/3/81 Tape #62222 / D.S.16-1 ~ 9/27/81 Tape #62215 DOS.16-11~/ 9/24/81 Tape #62202 DoSol6-16 ~/' ' 9/25/81 Tape #62203 D.S.17-7 J 6/4/81' Tape #61671 CORRECTED TAPE ase sign and return' the at'tached copy as receipt of data. Mary F. Kellis North -Engineering Transmittal #676 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY . STATE OF ALASKA EXXON MOBIL " GETTY. PS/'7 ..,~.~.,~E I ~ , ' SOHIO MARATHON Oit & Gas Cons. ~omm~sslon CHEVRON Anchorage ARCO Alaska, Inc. Post Office Bo>, 360 Anchorage, Alaska 99510 Telephone 907 277 5637 October 9, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject- Completion Gyroscopic Surveys Dear Sir' Enclosed please find the co. mj~letion Gyroscopi~Survey for the following/wells: DS 12-12,'~I~.~,.~!i~71~ DS 17-9, A-5~A-6, fl~-6,~x and B-7. Sincerely, P. A. VanDusen District Drilling Engineer PAV:cm Enclosures ALASKA OIL AND GAS CONSERVATION COMMISSION i~LL LOCATION DISCREPANCIES Kuparuk 25647 Kuparuk 25648 Kuparuk 25649 A-2 B-4 C-8 The following are all in the Prudhoe Bay Unit: DS 12-12 DS 14-11 DS 14-19 DS 14-20 DS 16-4 DS 16-5 DS 17-8 DS 17-9 /35 October 9, 1981 Mr. P. A. VanDusen District Drilling Engineer ARCO Alaska, Inc. P. O. Box 360 Anchorage, Alaska 99510 Dear Mr. VanDusen: We have recently received completion reports on several wells where the reported bottom hole location cannot be verified by the directional surveys that have also been submitted. The list of the wells in question is enclosed. We would appreciate your checking to determine the data used in arriving at the bottom hole locations for these wells. Since we have an internal program to cross-check the accuracy of the submitted data, it is necessary to detemine why the discre- pancies exist. If you could have a member of the department that determines this data call Mrs. Elaine Johnson at 279-1433 it should pin- point wl~ere and why there are differences. Thank you for your help in this matter. Yours very truly ~{ar~y W. Kugler Commi ssioner Enc 1 o sure HWK:be P. A. Van Dusen September 2, 1981 Incomplete Completion Reports Well Name and Number Comp 1 e t ion / Aba ndonment Suspension Late Prudhoe Bay Unit DS .16-1 Prudhoe Bay Unit DS 14-9A Prudhoe Bay Unit DS 16-4 West Sak 18 Prudhoe Bay Unit DS 16-5 Kuparuk C-8 Prudhoe Bay Unit DS 14-19 Prudhoe Bay Unit ~~ Prudhoe Bay Unit DS 14-20 Prudhoe Bay Unit DS 12-11 Kuparuk A-2 Prudhoe Bay Unit DS 17-8 1-9-81 3-21-81 3-27-81 4-17-81 4-21-81 5-15-81 6-6-81 6-10-81 6-30-81 7-1-81 7-2-81 7-2-81 _Overdue _(?) Completion Reports Prudhoe Bay Unit DS 16-14 Kuparuk B-4 Kuparuk A-3 Prudhoe Bay Unit DS 17-9 Prudhoe Bay Unit DS 12-12 7-9-81 7-14-81 7-24-81 7-25-81 7-26-81 PLEASE REPLY TO 5700 RALSTON STREET - SUITE 306 VENTURA, CALIFORNIA ~ SCHLUMBEI~ OFFSHORE SERVICES 5000 GULF ~r,~EEWAY,-- P.O. BOX 2175 HOUSTON, TEXAS 77001, (713) 928-4000 October 3, 1981 Dr. David Herndon SOHIO Petroleum Co. 160 Pine Street San Francisco, Caf 94111 Dear Dr. Herndon: EnclOsed is a remake of job 10707,61671, because of incorrect data This is the corrected LIS tape. Sorry for any inconvenience caused you. Sincerely~ Annemarie Nas~, LDP AN/an cc: Exxon, Houston (4) Anchorage A DIVISION OF SCHLUMBERGER LIMITED ARCO Alaska, Inc. Post Offi¢o rt[ Anchorage..Ale,.~ka . Telephone g~.7 277 5637 September 28, 1981 Mr. Harry Kugl.er State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: DS 12-11 DS 16-4' ~est Sak #18 DS 12-12 DS 16-5 A-2 DS 14-9A DS 16-14 A-3 DS 14-19 DS 17-7 B-4 DS 14-20 DS 17-8 C-8 DS 16-1 DS 17-9 Dear Si r' Enclosed please find the Completion Reports for the following wells' A-2, A-3, B-4 and C-8. Although these Kuparuk wells have been .per- forated, production test data has not been obtained; this information will be forwarded to your office when availabl.e. Also encloSed are Completion Reports for :the following wells' .DS 12-12, DS 14-19, DS 14-20, DS 16-4, DS 16-5, DS 17-7, DS 17-8 and DS 17-9. Production test information is not applicable for these wells since they haVe not Yet been perforated but will be submitted to your office when we obtain the information. Previously unreported information such as locations for bottom hole, producing interval and geological forma- tions have been added to the updated Completion Reports. DS 14-9A and West Sak #18 have been plugged and abandoned. An updated Completion Report with Drilling Histories for these wells is enclosed. Information regarding West Sak #18 is of a confidential nature and we would appreciate securely storing the report where it will receive mi'nimum exposure. The initial Gyroscopic Survey for DS 16-1 was unacceptable and a rerun is presently being authorized 'by our engineering staff. An updated Completion Report for this well will be sent to your office subsequent to our receiving an acceptable survey. The remainder of the requested information - an overdue Completion Report on DS 16-14 and an incomplete Completion Report for DS 12-11 was sent to your office August 27, 1981 and was apparently enroute at the time of your September 2, 1981 letter to this department. Also included are completion Gyroscopic Surveys for DS 12-12, DS 17.-7 and DS 17-9. Sincerely, p,i. s,trii~t.~.Dri 1 ] i ng Engineer .... RECEIVED SEP 0 1981 · Al;~ska Oil & Gas Cons. Commissiort Anchorage STATE OF ALASKA ALASKA O AND GAS CONSERVATION CO ,ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG -1. Status of Well Classification of Service Well OIL)~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, ;Inc. 81-66 3. Address 8. APl Number P,0. Box 360 Anchorage, AK 99510 50- 029-20596 4. Location of well at surface 9. Unit or Lease Name 2242' FNL, 930' FWL, Sec 22, TiON, R15E, UM ~ Prudhoe Bay Unit At Top Producing IntervalI ¥1::k~JFJED !. 10. Well Number 1500' FSL, 1734' FWL, Sec 15, TiON, R15E, UM iSur~.~ DS 17-7 At Total Depth/~'"Ol¢5~l /~¢¢.~ /)=~&¢~)/.. ~ 1 1. Field and Pool 1711j FSL, 1044' FWL, Sec 15, TION, R15E, UM Prudhoe Bay Field .5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe 0i 1 Pool 71' RKB ADL 28331 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 5/17/81 6/4/81 6/11/81 --- feet MSL] 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+l-VD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of PermafroSt 10790'MD 10755'MD YESE~X NO[] 2178 feetMD11900' (aPprox) , 22. Type Electric or Other Logs Run II,L/Sonic/GR. FDC/CNL/GR, CNL/GR 23. ' CASING, LINER AND cEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP 'BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# FI-413 .qurf 80~' 32" 232 sx AS II !3 3/8" 72# N-Rtl Surf 26R7' 17 1/2" 3000 SX Fondu + 850 sx PF II 9 5/8" 47# L-Sn~ '%urf ~. 9962' '12 1/4" 500 sx Class G cdt SO0-9E 7" ?q¢ I-RO 9657' 10790' 8 1/2" 420 sx Class G cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A _~ 1/?" 9644' 9568' " 26. ;:; ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INT.ERVAL(MD) AMOUNT& KIND OF MATERIAL USED ,; . N/^ , 27. PRoDUcTION TEST Date F Tst.Rroduction i Method of. Operation (Flowing, gas lift, etc.) ~/A Date of. Test Hours Tested PRODUCTION FOR OI L-EEL GAs-MCF WATER-EEL CHOKE SIZE GAS-OIL RATIO · ~, TESTPERIOD I~ Flow:,Tubiug; Cas ng Pressure CALCULATED ,. OIL~BBL~ GAS-MCF wATE'R-BBL OIL GRAVITY-APl (corr) Press. I': ' ~ !'. 24'H~UR RATE $' " ' 28. CORE DATA . Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/A . ,SEP 0 198:1 · · " ~' ' :': , ..... Alaska 0il &'Gas Cons. C0mmiss[0r~ ,. · ~chorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit 'in duplicate NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sad]erochit 10,133' 8900' N/A 0i 1/Water i0,340' 9093' Base Sadlerochit 10,694' 9428 31. LIST OF ATTACHMENTS Drilling History 32. I hereby certify that the foregoing is true and correct to the best of my knowledge : Signed -~ Title Dist. Drlg Engr. Date 9/17/81 INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injeCtion, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production frorn more than one interval (multiple completion), so state in item 16, and i'n item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 SCIENTIFIC DRILLING INTERNATIONAL 1111 East 80th Street, Anchorage, Alaska 99502 · 907/349-3541 · Telex: 09025364 (SDC AHG) Subsidiary of AMF INCORPORATED August 3, 1981 job #5257 North Slope Drilling: Enclosed please find our Gyro Survey on Dril!site 17-7 along with our Vertical Section and Horizontal View maps. Also enclosed you will find the Calculations. If any other information is needed please call at 349-3541. Thank you for using Scientific Drilling International and please call again. Sincerely Manager RECEIVED SEP ~ 0 1981 0il & Gas Cons. Commis$ior~ knchomg~ COHPLET[ON REPORT ARCO OIL & GAS GYROSCOPIC SURVEY RADIUS OF CURVATURE METHOD OF COMPUTATION COHPUTED FOR 5DC BY FM LINDSEY & ASSOC 31 AUGUST 81 WELL DS 17-7 KB ELEV 71. FT. JOB NO 5257 RECORD OF SURVEY TRUE MEAS, DRIFT VERTICAL DEPTH ANGLE DEPTH D M SUB DRIFT SEA DIREC DgG. 0 0 0 0.00 100 0 0 100.00 200 0 0 200.00 300 0 0 300.00 400 0 0 400.00 500 0 0 500.00 600 0 0 600.00 700 0 0 700.00 800 0 0 800.00 900 0 0 900.00 1000 0 0 1000.00 -71.00 S O,OOg 29,00 $ O.OOE 129,00 S O.OOE 229.00 $ O,OOE 329.00 S O,OOE 429,00 $ O.OOg 529.00 S O.OOg 629.00 S O.OOE 729,00 $ O.OOE 8'29.00 $ O,OOE 929.00 $ O.OOE 1100 0 0 1100.00 1029.00 S O.OOE 1200 0 0 1200.00 1129.00 S O.OOE 1300 0 0 1300.00 1229.00 S O.OOE 1400 0 0 1400.00 1329.00 S O.OOE 1500 0 0 1500.00 1429.00 1600 0 0 1600.00 1529.00 & O.OOE 1700 0 30 1699.99 1628.99 $35.16E 1800 0 30 1799.99 1728,99 S31.05E 1900 0 0 1899.99 1828.99 S O.OOE 2000 0 0 1999.99 '1928.99 S O.OOE 2100 0 0 2099.99 2028e99 S O.OOE 2200 0 30 2199.99 2128.99 S32.58E 2300 0 0 2299.99 2228.99 S O.OOE 2400 0 0 2399.99 2328.99 $ O.OOg TOTAL COORDINATES 0.00 S 0.00 W 0.00 S 0.00 W 0.00 S 0.00 W 0.00 S 0.00 W 0.00 S 0.00 W 0.00 S 0,00 W 0.00 S 0.00 W 0.00 S 0.00 W 0.40 S 0.12 E 1,1~+ S 0.60 E 1.55 S 0,72 E 1.55 S 0.72 E 1.55 S O,TZ E 1.96 S 0.8/+ E 2.38 S 0.96 E 2.38 S 0,96 E CLOSURES DISTANCE ANaLE D M S DOG LEG SEVERITY DEG/IOOFT 0.00 $ 0 0 0 W 0,00 S 0 0 0 W 0,00 S 0 0 0 W 0.00 S 0 0 0 W 0,00 S 0 0 0 W' 0,00 S 0 0 0 W 0.00 S 0 0 0 W 0,00 S 0 0 0 W 0,00 S 0 0 0 W 0,00 S 0 0 0 W 0.00 S 0 0 0 W 0,00 S 0 0 0 W 0,00 S 0 0 0 W 0,00 S 0 0 0 W 0.00 S 0 0 0 W 0.00 $ 0 0 0 W 0,00 S 0 0 0 W 0,~+2 S 17 3~ 59 E 1.29 S 28 0 1.71 S 2Z+ 53 18 E 1.71 S 2~+ 53 18 leT1 S 24 53 18 E 2.14 S 23 9 59 E 2,56 S 22 1 2 E 2.56 S 22 1 2 E 0,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,000 0,000 0.000 0.000 0,000 0.500 0,036 0,500 0,000 0.000 0.500 0.500 0,000 SEC T i,-"~ 0,00 0.00 0,00 O.OO 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.~ 0.~ 0.00 O,O0 0,00 -0.36 -0,96 -1,33 -1.33 -1,33 -1.70 -2.08 -2.08 ARCO DS 17-7 GYROSCOPIC SURVEY JOB NO 5257 31 AUGUST 81 RECORD OF SURVEY TRUE MEAS, DRIFT VERTICAL DEPTH ANGLE DEPTH D M SUB DRIFT SEA DIREC DEG, 2500 0 30 2499,98 2428,98 547,11E 2600 1 0 2599,98 2528e98 S 1.96E 2700 1 0 2699e96 2628,96 514.80E 2800 1 30 2799,94 2728,94 S78.36E 2900 3 0 2899.86 2828.86 N36,50E 3000 4 45 2999,62 2928.62 N34.61E 3100 6 15 3099,16 3028,16 N19,80E 3200 8 0 3198,38 . 3127.38 N18,93E 3300 10 0 3297.15 3226.15 N15.10E 3400 11 15 3395,43 3324,43 N 5.45E 3500 13 15 3493,15 3422.15 N 5,63E '3600 15 0 3590.12 3519.12 N O.OOE 3700 17 15 3686.18 3615,18 N 5,81W 3800 20 0 3780.94 3709,94 N 6.10W 3900 22 30 3874,13 3803.13 N 4.36W 4000 24 45 3965.74 3894,74 N 2.35W 4100 27 0 4055.71 3984,71 N 1.46W 4200 29 0 4144.00 4073e00 N 1.56W 4300 33 0 4229'70 4158.70 N 1,11W 4400 35 15 4312.48 4241.48 N O.13W 4500 35 30 4394.02 4323.02 N 0,36g 4600 35 45 4475,30 4404.30 N O.05W 4700 36 0 4556.3.3 4485.33 N 0,45E 4800 35 0 4637,74 4566.74 N 2.15W 4900 36 0 4719.15 4648.15 N 1.4~W 5000 35 30 4800.31 4729.31 N 1.16W 5100 35 0 4881.97 4810.97 N 0,90W 5200 37 0 4962.87 4891.87 N 0.80W 5300 36 0 5043-25 4972.25 N 2.01E TOTAL COORDINATES CLOSURES DISTANCE ANGLE O M S 2,77 S 1,13 E 3,93 S 1.66 E 5,65 S 1,91 E 7.07 S 3,42 E 5.74 S 6.89 E 0.25 S 10.82 E 8'24' N 15.19 E 19.94 N 19.30 E 3~.90 N 23.88 E 2.99 S 22 14 8 E 4.26 $ 22 55 28 g 5.96 S 18 43 26 E 7.86 S 25 47 48 E 8.97 S 50 lO 17 E 10.82 S 88 40 i g 17.28 N 61 30 9 E 27.76 N 44* ~ 40 ~ 42.29 N 34 22 53 E 5~.OZ.~.N 27.16 E 59,.57 N 27 7 43 E ~ 79.69 N 21 30 27 5 157.99:~:N' 160,06 N 9 14 lO g 194.08 N. 22.38 E 234.08 N 20.03 E 277.6'9 N 18.58 E 324.62 N 17.34 E 376.10 N 16.13 E 432.19 N 15.52 E ~90.08 N 15.64 E 548.33 N 15.80 E 606,93 N 16.00 E 664.99 N 15.14 E 723.03 N 13.33 E 781.44 N 12.00 E 839.15 N 10.96 E 897.91 N 10.09 E 957.39 N 10.72 E 195.36 N 6 34 47 E 234.93 N 4 53 34 E 278.31 N 3 49 44 E 325,08 N 3 3 29 E 376.44 N 2 27 25 g 4~2.47 N 2 3 26 E 490.33 N 1 49 41E 548.56 N 1 39 3 E 607.14 N 1 30 39 E 665.16 N 1 18. 17 E 723.15 N i 3 2~ E 781.53 N 0 52 ~9 ~ 839,22 N 0 4~ 55 E 897.97 N 0 38 38 E 957.45 N 0 38 30 E DOG LEG SEVERITY DEG/iOOFT 0.500 0.500 0.502 1.511 1.750 1.510 1.750 2.003 1.~03 2.000 1,790 2.307 2.750 2.513 2.275 2.257 2,000 4.002 2.274 0.302 0.288 0,304 ~.316 1.030 0.508 0.508 2.000 1.395 SECTION DISTANCE -2.41 -3.,~ 2.34 il.64 23.99 ~9.60 97.9d 78.98 102.92 lg9.DO 159.54 193.79 Z32.06 274.06 ~19.~ 423.33 479.57 ~36.1b 593.il 549.27 705.19 761.~8 817.36 87~.21 932.10 A~CO DS 17-7 GYROSCOPIC SURVEY JOB NO 5257 31 · AUGUST 81 : MEAS. DRIFT DEPTH AN~LE D M 5400 36 30 5500 37 0 5600 38 0 5700 39 0 5800 39 0 5900 39 30 6000 39 0 6100 39 0 6200 38 45 6300 38 0 6400 38 30 6500 38 0 6600 38 0 6700 37 0 6800 37 30 6900 36 0 7000 36 0 7100 35 0 7200 35 0 7300 35 0 7400 34 30 7500 34 30 7600 34 0 77OO 34 0 78O0 33 30 7900 35 0 8000 37 0 8100 38 45 8200 41 O TRUE VERTICAL DEPTH 5123,90 5204'02 5283,36' 5361,62 5439,33 5516,77 5594.21 5671.93 5749,78 5828.17 5906.70 5985,24 6064.04 6143,37 6222.97 6303,09 6384.00 6465.41 6547,92 6629,24 6711.40 6793,81 6876,47 6959,38 7042,52 7125,18 7206,08 7285,01 7361.75 SUB SEA 5052.90 5133.02 5212,36 5290,62 5368,33 5445,77 5523,21 5600,93 5678.78 5757,17 5835.70 5914,24 5993,04 6072,37 6151,97 6232,09 6313,00 6394,41 6476.32 6558,24 6540,40 6722,81 6805.47 6888,38 6971,52 7054,18 7135,08 7214.01 7290.75 RECORD OF SURVEY DRIFT DIREC DEG, N 4,35E N 7.85E Nll.95E N13.46E N13.05E N13.60E N13.01E N13,43E N14,55E N15.70E N15,38E N13,965 N13,53E N14,B3E N14,21E N14,95E N14,88E N15,43E N15,B5E N14.36E N16,18E N17,01E N15,81E N17,58E N15,43E N16,75E N16,865 N16,98E N19,185 TOTAL COORDINATES 1016,42 N 14,00 E 1075,91 N 20,36 E 1135,86 N 30,83 E 1196,59 N 44,52 E 1257,84 N 58.95 E 1319,41 N 73.53 E 1380,98 N 88,10 E 144~,24 N 102,50 E 1503,14 N 117.67 E 1563,07.. N 133,87 E 1860.10 N 210,56 E 1918,00 N 225.63 E 1974,80 N 240.76 E 2030,85 N 255,94 E 2086.15 N 271.16 E 2141'59 N 285.87 E 2196,57 N 300,89 E 2250,85 N 317,07 E 2304.83 N 332.98 E 2358,39 N 349,04 E .2411,66 N 364.83 E 2465,73 N 380,43 E 2521.99 N 397,42 E 2580,73 N 415.30 E 2641.66 N 435.19 E C I O S U DISTANC~ RES ANGLE O M $ 1016,52 N 0 47 22 E 1076.10 N i 5 3 E 1136,28 N 1 33 17 E 1197,41 N 2 7 51 E 1259,22 N 2 41 0 E i321,46 N 3 11 24 ~ 1383.79 N 3 39 1 E 1445,88 N 4 3 54 E 1507.74 N 4 28 3,4 E i568,79 N 4 53 43 E 1629,68 N 5 17 50 E 1690,79 N 5 38 21 E 17~1,76 N 5 55 24 E 1812,04 N 6 11 41 E 1871,98 N 6 27 30 E 1931,23 N 6 42 ?,3 E 1989,42 N 6 57 3 E 2046,91 N 7 10 58 E 2103.70 N 7 24 21 ~ 2160.58 N 7 36 12 E 2217,08 N 7 48 0 E 2273.07 N 8 1 6 E 2328,76 N 8 13 14 E 2384,08 N 8 25 7 E 2439,10 N 8 36 8 E 2494.90 N 8 46 15 E 2553,12 N 8 57 19 E 2613,93 N 9 8 30 E 2677.27 N 9 21 18 E DOG LEG SEVERITY DEG/100FT 0,965 1,363 1,848 i.167 0,262 0.547 0,551 0.262 0.504 0.867 0,515 0,734 0.267 10064 0e514 1.521 0.039 1,016 0.048 0.564 0,768 0.472 0,625 0,988 0.824 1,561 2,000 1,751 2.~41 SECTION OISTANCE 990,20 1110.20 1172,43 1235.36 1298.63 1361.90 1424,82 1487.59 1549,6~ 1611.53 1673.43 1735.00 1795,87 1856,40 1916,23 1974.99 2090 9 2147.73 2204,71 2261,29 2317.51 2373.36 2428,85 2485.09 2543.79 2805.09 2669,02 AI~CO DS 17-7 GYROSCOP!(2 SURVEY gOB NO 525'1 · 31 AUGUST 81 · RECORD OF SURVEY TRUE MEAS. DRIFT VERTICAL DEPTH ANGLE DEPTH 9 M SUB DRIFT SEA DIREC DEG, TOTAL COORDINATE5 8300 43 30 7435.76 7364.76 N16.93E 2705,58 N 8400 46 0 7506,78 7435,78 N19,63E 2772,41 N 8500 48 0 7574,.97 7503,97 N20,11E 2841,19 N 8600 48 0 764.t.89 7570,89 N18,63E 2911,29 N 8700 46 0 7710,08 7639,08 N19,91E 2980,32 N 8800 44 0 7780.79 7709,79 N21,28E 3046,51 N 8900 43 0 7853.33 7782,33 N22,18E 3110~,4.5 N 9000 41 0 7927,64 7856,64 N21.76E 317~,50 N 9100 39 15 8004.10 7933,10 N24,28E 323~.80 N 456,03 E 478.12 E 502.98 E 527.63 E 551.77 E 576.65 E 602 . 14- E 627,18 E 652,38 E 9200 37 15 8082,63 8011,63. N23,98E 9300 35 30 8163,14 8092,14 N23,80E 94.00 33 30 8245,55 8174,55 NgE,86E 9500 32 0 8329.65 8258e65 N25.30E 9600 29 0 8415,80 8344.80 N21.48E 9700 27 0 8504,09 8433,09 N22,96E ~532.73 N 9800 24 15 8594.25 8523.25 N27.665 3571,81 N 9900 24. 30 8685.33 8614.33 N28.65E 3608.20 N 10000 23 0 8776.86 8705,86 N33,18E 3642,74 N 10100 21 30 8869,41 8798.41 N33.45E 3674,38 N 10200 20 45 8962e69 8891.69 N26,21E 3705,63 N 10300 20 0 9056,44 8985.44 N26.56E 3736.81 N 10400 20 0 9150,40 9079,40 N25,10E 3767,60 N 10500 19 0 9244,67 9173,67 N20,56E 3798,35 N 10600 19 0 9339,22 9268.22 N2'2.005' 3828.69 N 10650 19 0 9386.50 9315,50 N22,48E 3843.76 N 10700 19 0 9433.77 9362,77 N22,9~E 3858,77 N 107qO ,q 0 N~.qsa 3g~S.7~ N BOTTOM HOLE CLOSURE 3974,40 FEET AT N 13 51 17 E 328 ~' ~,~, 3 :N 677,69 786 e 75 805,24 824 · 72 845,40 866 · ~0 899 914~ 50 927 · 45 939 , 26 945 · 43 951,71 %3. Ol CLOSURES DISTANCE ANGLE D M S 2743,74 N 9 34 3 E 2813.~4 N 9 47 5 E 2885.37 N 10 2 21 E 2958.72 N 10 16 21 E 3030,97 N 10 29 20 E 3100.60 N 10 43 6 E 3168.20 N 10 57 22 E 3233.90 N 11 10 D7 5 3296.99 N 11 24 45 ~ 3~57.41 i~ 11 38 42 E ~415.38 N 11 51 22 E 3470,60 N 12 3 58 E 3523.22 N 12 16 18 E ~573,01 ~ 12 25 43 E 3619,28 N 12 33 18 5 ~661.4.~ N 12 4.2 16 5 3701,25 N 12 52 29 E ~739.56 N 1~ 3 97 E 3775,10 N 13 15 ~3 ~ 3809,64 N 13 25 9 [ 3843.57 N 13 S2 8 ~ 3877,00 N 13 38 36 E ~909.94 N 13 43 17 E 3942.~2 N 1~ 47' 1 ~ ~958.32 N 13 49 6 E 3974.40 N 13 51 17 [ DOG LEG SEVERITY DEG/IOOFT 2.718 2.864. 2.018 1.102 2.107 2.106 1.084 2.008 2,019 2.00~ 1.751 2,097 1.508 2,023 2.862 0,302 1,652 1.500 1.178 0.751 0.502 1.109 0.467 0.31~ 0.~04 SECTION DISTANCE 27~6.06 2806,~ 2878.9~ 2952,94 3025.74 3095.96 3164.14 32~0.3~. 3294.00 33D4,91 3413,31 3468.90 ~521.87 361~,35 3660,72 3700,71 3739,~. 3774.~ 3~09.53 3843.51 3876.97 3909.93 3942.22 3958,32 3974,40 ARCO DS 17-7 GYROSCOPIC SURVEY JOB NO 5257 INTERPOLATED TRUE VERTICAL DEPTHS, COORDINATES AND CLOSURES FOR GIVE/'.4 DEPTHS TRUE CODE ,'VlEA SUR ED VERT ! (;::AL NAME DEPTH DEPTH TOTAL COORDINATES CLOSURE DISTANCE ANGLE D ~4 5 31 AUGUST 81 SUB SEA TOP SAD 10133 BASE SAD 10694 OIL/WATER 10340 PBTD 10755 TD. 10790 8900,1Z+ 3684,60 N 9428.10 3857,04 N 9093,38 3750.18 N 9483,42 3878.36 N 872.55 E 950.79 E 9'07.62 E 964.30 E 3786,51 N 13 19 22 E 8829.14 3972.50 N 13 50 52 E 9357.10 3858.45 N 13 36 18 g 9022J38 3996.44 N 13 57 45 E 9412e42 4013.24 N 14 7 16 E 9440.89 : , ARCO DS MEASURED 17-7 GYROSCOPIC SURVEY JOB NO 5257 DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, 31 · AUGUST 81 MEASURED DEP TH TRUE VERTICAL SUB MD-TVD VERTICAL DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES 171 271 371 471 571 671 771 871 971 1071 1171 1271 1371 1471 1571 1671 1771 1871 1971 2071 2171 2271 2371 2471 2571 2671 2771 2871 2971 3072 3172 3273 3375 3477 3580 171. 100 0 0 271. 200 0 0 371. 300 0 0 471. 400 0 0 571. 500 0 0 671. 600 0 0 771. 700 0 0 871. 800 0 0 971. 900 0 0 1071. 1000 0 ~ 0 o . o zoo oii o o 1871. 1800 0 0 1971, 1900 0 0 2071, 2000 0 0 2171, 2100 0 0 2271, 2200 0 0 2371. 2300 0 0 2471. 240Q 0 0 2571. 2500 0 0 2671, 2600 0 0 2771, 2700 0 0 2871, 2800 0 0 2971, 2900 0 0 3071, 3000 0 0 3171, 3100 1 1 3271. 3200 2 1 3371. 3300 4 2 3471, 3400 6 2 3571. 3500 9 3 0.00 S 0.00 S 0.00 S 0.00 S 0.00 S 0.00 S 0.00 S 0.00 S 0.00 S 0.00 S 0.00 $ 0.00 S 0.00 S 0.00 S 0.00 S 0,21 S 0,92 S 1,51 S 1.55 S 1.55 S 1.76 S 2.34 S 2.38 S 2.58 S 3,48 $ 5.16 S 6,79 S 6,59 S 2.08 S 5.53 N 16.42 N 30.55 N 48.26 N 69.00 N 93.40 N O,OO W O.O0 W O.OO W O,OO W 0.00 W O,OO W' O.OO W 0.00 W 0.00 W 0.00 W 0,00 W 0,00 W 0,00 W 0.00 W 0.00 W 0.04 E 0,47 E 0,74 E O,7g E 0,72 E 0.76 E 0,98 E 0.96 E 1.02 E 1,55 5 le78 E 2.76 E 5,82 E 9,48 E 13,98 E 17,95 5 22.52 5 28,56 E 30,22 E ARCO DS 17-7 MEASURED DEPTH AND OTHER DATA GYROSCOPIC SURVEY FOR EVERY EVEN 100 JOB NO ,,,5257 FEET OF SUB ,SEA DEPTH. 31 AUGU'ST 81 NEASURED DEPTH TRUE VERTICAL DEPTH SUB MD-TVD VERTICAL SEA DIFFERENCE CORRECTION TOTAL COORDINATES 3684 3789 3897 4006 4117 4231 4349 4472 4595 4718 4841 4964 5086 5210 .5334 5459 5584 5712 5841 9970 6099 6227 6354 6482 6609 6735 5860 6984 7107 7229 7351 7472 7593 7714 7834 3671. 3600 13 3771. 3700 18 3871. 3800 25 3971, 3900 34 4071. 4000 46 4171. 4100 60 4271, 4200 78 4371. 4300 lO0 4471, 4400 123 4571. 4500 147 4671. 4600 169 4771, 4700 193 4871. 4800 215 4971. 4900 239 5071, 5000 263 5171. 5100 287 5271. 5200 313 5371. 5300 341 5471. 5400 369 5571, 5500 399 5671. 5600 428 5771. 5700 456 5871, 5800 483 5971. 5900 511 6071, 6000 538 6171. 6100 563 6271. 6200 589 6371. 6300 613 6471. 6400 636 6571. 6500 658 6671, 6600 680 6771, 6700 701 6871, 6800 722 6971, 6900 743 7071, 7000 763 5 7 9 12 14 18 22 23 121,56 154,31 192.80 236,50' 285,45 339,94 403,18 473.68 545.23 617.49 688.44 760,47 831,11 903.93 ,40 ,36 28 1282,92 30 1362,63 29 1441,56 28 1519.49 27 1595.28 28 1671.93 27 1747,69 25 1821,72 26 1899.27 24 1965,87 23 2034.63 22 2102.17 22 2169.76 2.1 2235.70 21 230~,16 21 2365.88 20 2429,89 31,26 E 26,32 E 22,62 E 19,95 E 18,45 E 17,07 E 15,78 E 15,52 E 16.41 E 16.04 E 14,41 E 12.67 E 11,51 E 10,10 E 11,54 E 16.99 E 28.07 E 46e22 E 6~,74 E 83.51 E 102,09 E 121.79 E 142e50 E 162.89 E 182,00 E 200,59 E 219.33 E 237.56 E 256,95 E 275,41 E 293.16 E 312.38 E 331,56 E 351.31 E 369,77 E ARCO DS 17-7 MEASURED DEPTH AND OTHER DATA GYROSCOPIC SURVEY ~ JOB NO 5257 FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. 31 AUGUST · 81 MEASURED DEPTH TRUE VERTICAL SUB DEPTH SEA MD-TVD DIFFERENCE VERTICAL CORRECTION TOTAL COORDINATES 795 808 821 834 849 864 878 892 9O5 918 931 943 954 966 977 988 999 010 020 031 042 052 063 7171. 7100 785 7271. 7200 811 7371. 7300 841 7471. 7400 878 7571. 7500 923 7671. 7600 972 7771, 7700 1015 7871, 7800 1093 7971. 7900 1086: 8071. 8000 1114 8171. 8100 1139 8271. 8200 1159 8371. 8300 1177 8471. 8400 1192 8571. 8500 1203 8671, 8600 1213 8771, 8700 1223 8871, 8800 1231 8971. 8900 1238 9071. 9000 1244 9171, 9100 1251 9271, .9200 1257 9371, 9300 1263 2497,0~ N 2570,22 N 2649,14 N 2738.24 N 2837,16 N 2941.54 N 3037,65 N 3125,61 N 3206,87 N 3280.19 N 3347.66 N 3408,84 N 3~6~.64 N 3602.56 N N 3674.91 N 3708.45 N 3741,43 N 377~.38 N 3806.86 N 3838,83 N 389.41 E 411.25 E 437.74 E 465.86 E 901.01 E 537,58 E 572.48 E 608,23 E 640.96 E 673.49 E 703.90 E 732.45 E 759,08 E 779.83 g 799e86 5 821.19 E 843.79 E 8'66,54 ~ 889.49 E 901e84 E 917,58 E 930.29 E 943.36 E ARCO DS 17-7 GYROSCOPIC SURVEY ,JOB NO 5257 INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH. TRUE MEASURED VERTICAL SUB DEPTH DEPTH SEA TOTAL COORD [NATES 1000 lOOO, 2000 1999, 3000 2999, 4000 3965, 5000 4800, 6000 5594. 7000 6384. 8000 7206. 9000 7927. 10000 8776. 929. 0.00 S 0.00 W 1928, 1.:55 S 0.72 E 2928. 0.21 S 10.76 E 3894. 234'.09 N 20,28 E 4~729. 781.45 N 12.31 E 5523, 1381.06 N 87,77 E 6313, 1975.03 N 239.85 E 7135. 2522.23 N 396.63 E 7856. 3172.70 N 626,66 E 31 AUGUST 81 · 400* 800- · · 1200- 1600- 2000- 2400- 2800- 3200' SURFACE LOCATION IS 2242' SNL, 9:50' EWL, SEC. 22 T. ION., R. 15 E., U.M. VERTICAL SECTION ARCO ALASKA~ INC. WELL DS 17-7 RADIUS OF CURVATURE GYROSCOPIC SURVEY SCALEs I" = I000' SEPT. I~ 1981 $600 ALL DEPTHS SHOWN ARE TVD 721 · . 8400~ · 8800~ 9200~ TVD: 94:54' TMD: 10,700' HORIZONTAL VIEW ARCO ALASKA, INC. WELL DS 17-7 RADIUS OF CURVATURE GYROSCOPIC SURVEY SCALE= I" = I000' .SEPT. I, 1981 T. I0 N., R. 15 E., U.M. 21 TVD = 9434 ' eaoo TMD = 10,700' 850O, 8400. eooo .. o ALL DEPTHS SHOWN ARE TVD ARCO Oil and Gas Company North Alaska ' 'trict Post Off;ce B. 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer September 23, 1981 Reference: ARCO Magnetic Tapes & Listings D.S.14-4 9/16/81 D.S.-7-4 9/21/81 D.S.17-7 9/3/81 Tape #CN/Multispaced 11560-12690 Tape'#CN/Multispaced Tape#CN/ Multispaced Dresser 8850- 9320 " 2650-10750 "~~ ase sign and return the art. ached copy as receipt of data. Mary F. Kellis' North Engineering Transmittal #622 DISTRIBUTION NORTH GEOLOGY R&D DRILLING -. ENG. MANAGER D-&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY MARATHGN CHEVRON Ai;mk~ Oit & G~s Co~s.'Commlssion ~chorage ARCO Oil an(~ GJs Company ~s a Divi.~=ort oi AtlanlicRichfieldCompany ARCO Oil and Ga,. mpany North Alaska District Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer September 16, 1981 Reference: ARCO DIRECTIONAL SURVEYS ~.?~D.S.17-7 8/31/81 Gyroscopic D.So12,12 8/31/81 Gyroscopic D.S.l'7-9 8/31/81 Gyroscopic Job No. 5257 Job No. 5256 Job No. 4469 . se sign and return the attached copy as receipt of data Mary F. Kelli's North Engineering Transmittal #599 DISTRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D & M SOHIO GEOLOGY MARATHON S~ATEiOF CHEVRON 'Alas~ Oit & Gas Cons. Commissio Anchorage September' 2, ~1981 .. ~ · Mr. P. A. Van Dusen District Drilling Engineer Arco~'Alaska, 'INC. P.O. 'BOX 360 I Anchorage, Alaska 99501 Rez Overdue Data Submission ~ear Mr· Van Dusen: Wells on the attached lists are those for which Completion ~eports (form 10-407) are either incomplete or apparently overdue, with 'completion,~ abandonment, or suspension dates prior~to'August 1, 1981. i The first list is of those wells for which an incomplete Completion P. eport was filed, with the comment that the locations at the top of the producing interval and at the total depth were be submitted" or "N/A." The'icompletion dates go back to January,' 9. t The second, list is of those Wells for which available information indicates the wells have been cc~.~pleted, but the 30 day filing period has passed without a Completion Report having been subm~[tt ed. · We need to be brought up-to-date on directional survey proDlems that may be responsible for these late filings, or have the required directional surveys, and reports submitted to us. We would appreciate a respons~e at your earliest convenience. Sincerely yours, Harry Ku9 ler Commissioner RWK/JAL/g lh ARCO Oil and GasF~mpany North Alask[ istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer August 17, 1981 Reference: ARCO Magnetic Tape & L'isting D.S.17-7 8/13/81 Tape #CN Multi-Spaced Alac-1071 Dresser Atlas e sign and return 'the attached copy as receipt of data. Mary F. Kellis NorthEngineering Transmittal #522 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany EXXON MOBIL GETTY PHILLIPS SOHIO _ REr I VEI), CHEVRON AlaskaOil& GasCons. Commission Anchorage ARCO Alaska, Inc. Pcst Office [ 360 Anchorage. A,aska 99.510 Telephone 907 277 5637 July 21, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil' and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SubjeCt: DS 12-10 DS 16-14 DS 12-11 DS 14-18 DS 17-8 DS 14-19 A-1 DS 14-20 A-2 DS 16-1'3 B-3 B-4 Dear S ir' Enclosed 1 ) The 2) The. 3) The DS 1 4) The A-1 please fi nd: monthly reports for DS 16-14 & B-4. subsequent Sundry Notice for DS 14-18. Completion Report~s~S 12 10 DS 12-11 DS 1_~-19, 4-~0, ~s ~-~a, s ~!_Z!~s ~7-~, ^-~, ^-~ ~ ~ . Gyroscopic Surveys for DS 12-10, DS 14-20, DS 16-13, and B-3. Sincerely, P. A. VanDusen District Drilling Engineer PAV/KJG-sp Enclosures RE[EIVED JUL 2 1 198] 'A!3ska Oil & Gar, Cons. Commissiol] .An. chora§~ ! · .,J · i STATE OF ALASKA ' ALASK ,'~ AND GAS CONSERVATION C v,MISSION , WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~( GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-66 3. Address 8. APl Number P.O. Box 360 Anchorage, AK 99510 BO- 029-20596 4. Location of well at surface 9. Unit or Lease Name 2242' FNL, 930' FWL, Sec 22, TiON, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number To be Submitted DS 17-7 At Total Depth 11. Field and Pool To be Submitted Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease D~signation and Serial No. Prudhoe 0i 1 Pool : 71' RKBI ADL 28331 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 5/17/81 6/4/81 6/11/81 --- feet MSL 1 17. Total Depth (M D+TVD, 18. Plug Back Depth (MD+TVD: 19. Directional Survey I 20. Depth where SSSV set I 21. Thickness of Permafrost 10790' MD 10755'MD YES []XX Nor--] 2178 feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIL/Sonic/GR, FDC/CNL/GR, CNL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surf 80' 32" 232 sx AS II 13 3/8" 72# N-80 Surf 2687' 17 1/2" 3000 sx Fondu + 85[ sx PF II 9 5/8" 47# L-80& .Surf 9962' 12 1/4" 500 sx Class G cmt S00-9! 7" 29# L-80 9657' 10790' 8 1/2" 420 sx Class G cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD · interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A 5 1/2" 9644' 9568' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED .... " ' N/A . 27. ' pRoDUCTION TEST Date First Production l Method o[ O. perati.on (FIo~ving, gas lift, etc.) . ~.r..~t~. . .. . . I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OILRATIO I TEST PERIOD ~ Flow T~bing ', Casing Pressure. CALCULATED OI L-BBL GAs-Mc F WATER-BB L ~ ~? ~Vi V ~ (corr) Press. '" 24-HOUR RATE j~ · -Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit C°yL~_PS~__ 1 · . · . N/A ~laska 0il &a.~ _~as COns. C0mmissimi .., : . .. ,~,, . ,~,c,0rau0 ,,. . Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. To be Submitted N/A ]ling Histor,v . 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Dist. Drlg Engr. Date 7/10/81 INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item' 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this Well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". DS 17-7 DRILLING HISTORY NU 20" riser. Spudded well @ 1230 hrs, 5/17/81. Drld 17½" hole to 2700'. Ran 66 its 13-3/8" 72#/ft L-80 Butt csg w/shoe @ 2687'. Cmtd 13-3/8" csg w/3000 sx Fondu & 850 sx Permafrost II. ND 20" riser. Instld 13- 3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 12¼" hole to 9985. Ran 247 jts 9-5/8" 47#/ft L-80 + S00-95 csg w/shoe @ 9962'. Cmtd 9-5/8" csg w/500 sx Class G. Instld 9-5/8" packoff & tstd to 5000 psi - ok. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8½" hole to 10,790 TD. Ran DIL/Sonic/GR, FDC/CNL/GR, CNL/GR. Arctic packed 9-5/8" x 13-3/'8" annulus w/300 bbls H20, 300 sx Permafrost type C & 131 bbls Arctic Pack. Ran 39 its 7" 29#/ft L-80 8rd/AB Mod lnr fr/ 9657-10,790'. Cmtd 7" liner w/420 sx Class G. Drld cmt to 10,755' PBTD. Tstd lnr lap to 3000 psi .- ok. Displaced well to NaCl. Ran VDL/GR. Ran 5½" completion assy w/tail @ 9644' & pkr @ 9568'. Tstd tbg hanger & packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Displaced well to diesel. Dropped ball & set pkr. Tstd tbg to 3000. psi & ann to 200 psi ok" Tstd tbg to 200 psi & ann to 3000 psi - ok. Closed SSSV. lnstld tree cap & tstd to 5000 psi - ok. Secured well & released rig'@ 0830 hrs, 6/11/81. RECEIVED JUL 2 1 1981 Alaska Oil & Gas Cons. Commission Anchorage ~.~. i Eastman _~------~'~ ,~ Wh~P~~ot~9Ak~ AL/ REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO ALASKA, INC. COMPANY Drill Sight 17r Well Number 7 WELL NAME RECEIVEi) JUL ! 7 ]98] 0~ & Ca$~ons. Comrnissio Anchorage Prudhoe Bay, North Slope, Alaska LOCATI ON JOB NUMBER A581D0339 TYPE OF SURVEY Directional Single Shot DATE 30-Jun-81 SURVEY BY Hensley/Cook OFFICE Alaska Eastman Whip sJ c3 P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 34~4617 June 30, 1981 ARCO ALASKA, INC. P.O. Box 1479 Anchorage, Alaska 99510 Well Number: DS 17-7 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Directional Single Shot Date: 30-Jun-81 Method of Computation: Radius of curVature Surveyor: Hensley/Cook Job Number: A581D0339 Attn: Bob Hines Dear Mr. Hines,: I am enclosing the original'and one copy of the Directional Single Shot Survey run on the above mentioned well. We wish to take this opportunity to thank you for calling on our services and trust that we may continue to serve you in the future. Sincerely; L~ROY KEYS District Directional Drilling Supervisor LK/dj cc: file enclosure Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide ARCO ALASKA INCo DS 17, WELL NO: 7 DSS F'RLIDHOE BAY, NORTH SLOPE , .. ALASKA JOB NO; A581DOS~9 DSS, 0-10790 MD, DRILLER; HENSLEY/COOK RIG: ROWAN 35 DECLINA'I'ION: S0 1/2 BEG EAST VIERT II;Al. SECI'I ON CALCULATE~i';;'~;'~i~ F'LANS~:OF: :PR:OF'OSAE''~ ,~., DIRECTION: N 11 'DEG.. 18 MIN. .. . RECORD OF SURVEY ............................. RAI)IUS OF CURVATURE ME:I'HOD RCO ALASKA INC. ~S :1.7~ ~EL.L NO: 7 DSS F.'UDHOE BAY~ NORTH SLOPE~ ALASKA . COMF'UTATION PAGE NO': ' 1 , JOB NO1 A581D0339 TIME DATE 18:20;21 29-JUN-81 ~, TRUE .I£ASURED DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N O U l. A R C L 0 S U R E DOGLEG DEPTH ANGLE' DIRECTION LENGTH DEF'TH , SE[;TION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITY 1::' ti!: E: T D M D M F E E T F'E E T F E E T F' E E T F E E T F' E E T D H D G / 100 F:' T O. 457. i 146. 1663, 2700 · 0 0' 0 0 O, .. 0,00 0 '0'" 0 0 457. 457,00 0 15 N 20 0 W 689, 1146.00 0 15 N 89 0 E 517, 1662.99 I 15 S 30 0 E 1037. 2699.89 0,00. -71,00 0,00 386,00 ~o 1075.00 3.05 1591.99 -0.99 ...... ~o ~o~o,89 0.00 0.00 0.00 0.00 1.41N 0.51W S.O0 N 0.58 E: 3.38 S 11.85 E 2843. .1. 45 N i 0 W 2966. 3 45 N 23 0 E S090. 5 45 N ,-_,=°~' 0 E 3277, 9 0 N 12 0 E 3400. 11 0 N 5 0 E 3608. 14 45 N I 0 E ,.,/0,,.. 17 0 N I 0 W 3858. 21 0 N 0 0 W 3984. 24 0 N 0 0 W 4110. 27 30 N 0 0 W 143. 2842.84 I~.~. 2965.69 124. 3089.26 187. 3274.69 123. 3395,81 0.25 2771.84 6.11 2894.69 16.18 3018.26 40.03 3203.69 61.35 3324.81 2.64 S 14.50 E 3.11N i5.61E 12.60 N 19.54 E 35.52 N 26.55 E ,o 63 N 29.71E 208, '.-: ~u.8,55:: .......... 107,20 ~'3527,55 i:.-~ 102,89 N 94 · -' ' o.-, 96' ?: ~'"' ~ooo · 132 .-0.60 N 1 ...,,_.. 3836.4~ i c.,.... o~.,11> 3765.43 179.38 N .-.~ 126. 4066.29':::''~;''';~ 283.06 3'-795 .'2 9'i':~ 282.32" N 32.13 E 32.13 E 31.69 E 31/.69 E 31.69 E 0.00 0 0 0.00 0 0 1.50 N 20 0 W 3.05 N 10 59 E 12.32 S 74 6 E 14.73 S 79 41E 15.92 N 78 44 E 23.25 N 57 12 E 4,4.35 N 36 47 E 63.95 N 27 41E 107.79 N 17 21 E 1:52.56 N 14 2 E 182.16 N 10 1 E ,~9.79 N 7 56 E 284,10 N 6 24 E 0.00 0.00 0,04 0.08 0,11 2 3 1.84 1.61 1.86 1.90 1.85 ° 46 57 2,38 2,78 "~"~':'q 30 0 N 'g 0 E ~ m:.. C) "" 4~,~.,. ,~5 0 N i 0 E 4694. 36 0 N 0 0 E 5100. 36 30 N 1 0 E 5317. ~6 SO N 6 0 E 5460. S6 30 N 7 0 E ..~uu. 37 0 N 9 0 E 5952. 39 30 N 1°~ 0 E 6200. 39 ~5 N ~4 0 E 6514. 38 30 N 15 0 E 118. 4169.74 338.90 4098.74 130. 4279.35 407.70 4208.35 336, 4552,89 599,36 4481.89 406. 4880,30 ..... 835.17 .4809.30 217. 5054.74 963.01 4983.74 339.06 N 408.87 N 603,97 N 844.03 N 972.82 N 143. 5169.69... 1047.77 5098.69 1057.34 N 90. 5241.80 1101.53 5170.80 1110.66 N 40n~.. ~7.47 1350.~3 ~'486.47 1355.32 N 248.. 5749.18 ._1507.59 5678.18 1508.61 N 314. 5993.63 1704.35 5922.63 1699.40 N 32.68 E 34.51E 36.21E 38.30. E 46.18 E 340.64 N 5.30 E 410.32 N 4 49 E 605.06 N 3 26 E 844.90 N 2 36 E 973,92 N 2 43 E: 55.81 E 1058.81 N 3 1 E 63.30 E 1112.46 N 3 16 E 108.65 E 1359.67 N 4 35 E 144.04 E 1515.47 N 5 27 E 193.38 E 1710.37 N 6 30 E 3.87 0.34 0,19 0.42 1.44 0.77 0.52 0.31 ~' ..... . . . "'"' , 95 N 7 34 E :.982. 36. 45 N_J. 3 .0 E. 468.,. 6364.,28 ........ 1989,7':-2... 620-,3,28 1976 60 N .. ~o2,49 E 1993, 7294. 35 1=-,., N 13 0 E 312. 6616.69 2173.02 o':.~,15., .69 .-:'"155.28 N 303.75 E ,_.~176.58 N 8 i E 7790. 34 0 N 10 0 E 496. 7024.84 2454.81 6953.84 2431.42 N 359.93 E 2457.91 N 8 25 E 8nn6...~ 0 38 0 'N 12 0 E 436. 7377..50~...,'-,"v11.01 7306.50. ,~")/,°'~...92 N 408.81 E 2713~88. N '840 E ~,~8.~"'~ 46 15 N 15 0 E 31'-~.. 7608.70 291'9.93 7537.70 2886.21 N 457.62 E ..,~_,=-~e-~.~.26 N 9 i E 0.46 0,48 0.43 0,96 2,72 RCO r.,LI-.~..~I'.A INC. ~S :1.7, WEi_L NO: 7 DSS 'RUDFIOF BA/", NORTH SLOPE, ALASKA BOB NO: A581DOSS9 TRUE COMPUTATION TIME DATE 18:20;21 29-JUN-81 PAGE NO, 2 ~Ii.']ASURED DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E OOGLEG DEPTH ANGLE DIRECTION L. ENGTH, DEF'TH SECTION TVI) C 0 0 R D I N A T E S I)ISTANCE DIRECTION SEVERITY F:'E:EI' D M D id FEE:T FEEl' FEET F'EET F'EET FEEl' D M I)G/iOOFT 8807. 46 .0 N 16 0 E 9024. ,;2 'O'N 1.8 0 E 91:1.8, 40 0 N 19 0 E 9427, 35 0 N 20 0 E 9734. 29 0 N 25 0 E ~:6y.. 7795.14 311~.32 7724.14 3073.07 N 217. 7951.21 3263.'-~8,, 7880."~1~. 3217.19 N 94. 8022.15 3324.46 7951.15 ~,~"~'"~::~,. 66 N .~ 2v 3510,='''' 81c',~ 2.~ .=..~ 309. 8~67. .~ ~..o ~o..~ 34u~.92 N S07. 8527.45' S670.04 8456.45 S60S.11 N 9o8s, ~5 1~ '~"^~ 94 N ...... , N~.n~, 0 E 251, 8750,80 ..... 3780,71 8679,80 o/u~, 10790. 19 0 N 25 0 E 805. 9496.15 4073.81 9''~'4~.~.15 ~/o~"'~'.30 N 509.44 E 5115.01 N 9 25 E 553,50 E 3264.45 N 9 46 E 573.07 E 5325.41 N 9 55 E 6S5,8.4 E 7~510.98 U 10 ,~6 E 698.05 E ;5670.10 N 10 58 E 748.20 E 3780.72 N 11 25 E 881.0,; E 4074.69 N 12 29 E 0.28 1.95 ~ 24 106~ 2.14 I ~ 0.78 F]:NAL CLOSURE DIRECTION; N 12 DEGS 29 MINS E D I STAt. ICE ~ ,1-074,69 FEE]" " ...... :-. .... j ,~ ,:~ :',:' ,; -~, ................. ..... 18:20:21 2~-JL~N-81 FILoE NUMBER; 22.9 ARCO ALAS~A INC. Ill-] 17~ WELL NO; 7 OSS PRUDHOE BAY, NORTH SLL.I~.E, ALASKA JOB NO~ A581DOSS9 'ONVERSATIONAL SURVEY PROGRAM V02~11 ARCO A[..ASI'(A INC. :OS ].7, WELL NO: 7 riSS F:'RUDHOE BAY, NORTH SLOPE, ALASKA DRIFT.,~HART'S RELAI'ED DATA FILE JOB NO,* A581DOSS9 · ':i.;tJRVEY FILE NUMBER '229 BOTTOH HOLE ASSEHBLY VALUES USED FOR DEPTH ARE: MD DEF'TH 0.00 2800.00 S460. O0 5100.00 5952,,00 8226 .. O0 8538. O0 9995.00 DESCRIPTION .... DYNADR I L.L.. ~ ANGLE BUlL. FI ASSEMBLY F RL;IxEL FtOLE ¢-,oc>EMBLY..j::::..:...;:::j:ilji:_;: PACKED HOLE ASSEHBLY SLIGHT ANGLE BUILD ASSEMBLY ANGLE I)ROF' ASSEHBLY F'ACKED HOLE ASSEHBLY DAY 1 DRILLING BAYS VALUES lC. L,...ET~ FOR DEPTH ARE MD I)EF'TH 0.00 WEIGHT ON BlT WE:IGHT IS GIVEN PER 1000 POUNDS VALUES USED FOR DEPTH ARE: l"iD DI:.-. F' T I'~ WE I Gl-IT ,.JlO0. O0 595~ . O0 8°26-'., O0 8~;38. O0 9995.00 45.00 60.00 60.00 65.00 46,00 ....... :. .':...; i?' ,':'':;' .. ,?: .'.; "-:*. ' ..... '¢" ... REVOLUTIONS F'ER.MINUTE V~.~LUE... LISED FOR DEF'TH ARE MD D E F' '1" I.-I 2800. O0 S460.00 ,., 1 O0 · O0 5952° O0 8,-,n · -..6 + O0 8538o00 9995.00 0,00 120,00 60~00 128,00 120,00 130,00 90°00 NELL NO: 1 ,.,SS JOB · " PRUDHOE BAY, NORTH SLOPE, RLRSKR. ! - ' , ... ' DRIFT CHART ..... i - . .... ..... ...... 5000 ..:.:. 4oo0': · .:.3000 _ .. ... EO00 ;. 'lOOO 8000 .... ~ ..... ~ ......~ ......... : ....... , ,.. ~ ..... ~ . ~ ~ ..... : ~ -- . ........................... ~ ....... ~ .... +_.;__,'' '! .... ~. L'7 ': ' ~ ..... ~ ....' "-! ........... 000 .... : "' ; i ... ~i.. ; .... ' : ' . ....~"~ :.:.;i ::'i": ~ ......... : ! ....I I ~ :-- ............ : T .... .-:' :- :::~' '----.-?"' ..--':-:.~.': ................ ~ ................ · . ' 6:-Ouu "· ,' -i .......... .. ~: . .., ........ I , .. ..~ ,.::::.':.:,';--: ... .... -: .....: ' ... ;~ '. :':'i-.: Z'.: ~. ':..:.;.',:: ': :" , .... ~ .... '' ' ".'~--i~ :":..:i" · .- -~ - i ....... .......... I ' ..: .... ,' ',' ..~ ............ ; ; ~ ..... · :' "i::"-~-~-:i':-..':;.--:-i'- / . ~'-.' ': ,' ! .:.': .... t ' :-~' ..... ~":' · : .... ~ ~ ~ ....:' " .... ........ ~ ...... ~. '-~ .......... ~ ' ~ '. ~ ....... i ..... .... , ..... ~- .',--.~-,--.i--' !. ', '"{ ' ''~ ........ !'. , ' ::::::::::::::::::::::::::::: ?' :..-'-:-;' ' ':"" ~",-':~."::':":..-":: '::-:' I :'" ::' ::'..: '.'- 'i ....~ :.-.:;. ..~-:,..'- . , ~ ·~ . ~ ............... I ........ · - , ..... ! .... i!:~. ............ !.. ; . . ..~ ....... : ......... ; .... __~ ..... ~.-:- . . ._~ '! · ..; ............. , .... . ---:-----~ .--TTT'" .. :.--T'-T%5---.-'T~":' ', '":T--~ ....... F~-T-:-7':':-' : ,-:':T,, :--':- .... :":': .... i::'.'--_':'~.':-',::::::"'-,"':::': ;'::: ........... !~-'-".'- !':': .... "-'-- '': t ..... ! ......t ....... ~;: ~,~:: · :~ ....... :, ....... !' " .... ', :: ....].:Z'.: ,. .... ! ..... !::.. '; ..... i '''! '! '' ' .'' ~ "':1 ..... ! .... ',''"' · ' Z:..:.~ ....~'. L'..' _ ' :. .." ,~ '~'~"''' '','' ' " :-'.":' ~ . :' ':~:":. :Z' ,,:':':'.:':'.'-":".':":'T-':::-:'~ I . . .:'::':";"~"' .... ~ ;.... , · ..... ~ ..-; -,..: , ~,, ..... - .. __'__ ' ...... f "I '" ; ~ ....I : ..! .'..I ........ ; : i ~:;. i"':.! : i''-- ' ":--:- .................... ~ .... ~ ................... i ...... ~-" :: ..... ! ............................. '~ ....... ........ : . ~ ..... ~ ............ :, .~ ..... : ...... : '-:-': ....... -.'! .......... :¢ ......... i ........ :, .... : ........ : .... :;:-':.' - · ] · . . ..... .~ ........... .-:-:-.-::-:- . ½ . .~ · . . 0 ......... i . ~. " I ' _ I ~ . . ~90 '' BXO I 9:90 950 10 -'. "':: : ' ... :,:i .... :. ,.- · ' !RZ I MU TH ..... ':.: .:. ::.': :. L':. '-- '..'-_. · .. . ;':: :.:.~'.:.'-.'j.': .... .......... F: ..... . .......................... :-' .+ ......... : ....... :'. .... ""- ........................ , i , B~ OYNRDRILL · ' C: ANGLE BUILD RSSEHBL¥ ' .......... D: PACKED HOLE RSSEHBLY -'. '' ' :' E: PACKED HOLE RSSEHBLY . : .,, : : ; ~ -- : F: SLIGHT RNGLE BUILD · . . , . ; : ......... J ........................ ............... ASSEMBLY ........... . ..... i ....... :: ...... Z.-::" '.' "Z-T- :-:'.'! ................ , · . · , -- G: ANGLE DROP RSSEHBLY : ~ ....... ~ H: PRCKF..D HOLE R$$EI'~LY ..... ; i : ~ . ,'' ; : · _ . ~RE6ORLRSKR INC.~'-~ S DS 17, NELL NO: S PRUDHOE BRY, NORTH SLOPE, RLRSKR . . . · ERSTHRN WHIPSTOCK. INC. Vii~ T I CRL PROJECT I ON SCRLE 1 IN. = 2000 FEET · .. 2000 . _m 4000 . ¢ o .... 6000 . ~. 8000 .......... I0000 2843 3608 5460 . : · 6982 "' 8807 9985 ........... .... iZ.~_T..XZ~i'ZiiL ............................ :~_.._]Z_;_~LiZZ:Z_~ .... i.- ..... i..£ ........... ...___' .... ~ ...... :, i - I I I 0 2000 4000 6000 ~ ........... YERTICRL SECTION .............. CLOSURE 4074.68 N 12 29 14._.E .................................................... ~ . . . ; RRCO RLRSKR INC. ;? BS 17, WELL NO: ~ QSS PRUDHOE BAY, NORTH SLOPE, RLASKR ZONTRL PROJECTION SCALE 1 IN. = 500 FEET DEPTH INDICRTOR: TVD ERSTHflN WHIPSTOCK. INC. ...... ' .................. i ................ ,,,., FINRL STATION: .. ' ....... . . )u DEPTH 10790 HD. 9496.:1.5 TVD ' · ! '/NORTH 397e. P9 ERST SSI.03 ..- ...... ' . .'/CLOSURE ..4.0,/4;68..N_ !2 29 14...E._ · ' ' i-'.. ' ' ........ . ~ .......... i .-f~-.~-: ................ .... i .... ,.: .......... :-~{ ........ ~..: .... :-:.~ 5169 ' ; 4169 Chcck Foden for tin~ly ccnipli~u~ce .with our regulations. O~rator, Well I.~ame and Reports .a.nd Materials to be received by: · DJte Cc~pletion Rq~rt ' Wel 1 History Sa~oles R~]uired Date Received Yes I Core Description J Registered Survey Plat .Inclination Survey '~ D~rectional Survey Drill Stem Test Reports Production Test Reports Logs Run Digitized Log Data Yes r7- /3 ARCO Oil and Gas ~ompany North Alasi ~istrict Post Olf:,ce Box 350 Anchorage. Ak~.ska 5'9510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer July 13, 1981 Reference: ARCO Directional Surveys D.S.16-13 6/20/81 Gyroscopic D.S.12-10 6/7/81 Gyroscopic D.S.14-19 6/30/81 Single-Shot D.S.12-11 6/26/81 Single-Shot D.S.17-7 6/30/81 Single-Shot /Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #428 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY P,r,' 'I PHILLI~'5'C~. ' ": " '"J " '" f" J ~ ~ !i SOHIO ,,,~ - ~z~'-'~ CHEVRON r,.-,,~,.~ ~,.,~ · .. Anchorage. Alaska 79510 Telephone 907 277 5637 Jerry A. Rochon Dislric! Operations Engineer July 9, 1981 Reference: ARCO Cased Hole Finals D.S.16-13 6/14/81 ACBL/VDL/Gamma Ray Run 1 5" D.S.17-6 6/13/81 Fluid Density Run 10 5" .~D?S,.lY~7~ 6/16/81 CNL/Gamma Ray Run 1 2"/5" se sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #423 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY . RECEIVED CHEVRON Alaska Oit& Gas Cons. Commission Anchorage ARCO Oil and Gas Company North Alask ;strict Post Office box 360 Anchorage. Aiaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer June 26, 1981 Reference; ARCO Cased Hole Final Prints / D.S. 12-10 6-3-81 ACBL/VDL run 1 5" ~ ': D.S. 14-19 6-1-81 ACBL/VDL run 1 5"'/ D.S. 16-2 4-14/15-81 CCL run 1 2" D.S. 16-13 6-9-81 CNL run 1 5" D.S. 17-5 6-4-81 ~D. S,~?~=~{ii 6.7-81 CNL: Gamma Ray Multi-Spaced Neutron run 1 ! ACBL/VDL Ganm~ Ray run 1 5" ~/ Please sign and return the attached copy as receipt of data. Kelly McFarland North Engineering Transmittal # 375 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENGo MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHGN CHEVRON RE£EIVED JUN 3 0 1981 ~ast~ Oil & Gas Cons. Commission A~ch0rage ARCO Oil and Ga( ~mpany North Alasl~, District Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer June 23, .1981 . . Reference; Magnetic Tape and Listing S. 17-7 6-4-81 Magnetic Tape and List # 10707, 61671 Please sign and return the attached copy.as receipt of data. Kelly McFarland North Engineering Tr~an~/smittal # 381 7-la- F/ DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG, MANAGER D&M GEOLOGY 'STATE OF ALASKA EXXON. MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON RECEIVED JUN ~ 0 1981 011 & Gas Cons. Comnd~don Anchorage / ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany ARCO Oil and Gas(' mpany North Alask& .Jistrict Post Off;ce Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer June 19, .1981 Reference; ARCO Open Hole Finals D.S.17-7 6/4/81 D.S.17-7 6/4/81 D.S.17-7 6/4/81 D.S.17-7 6/4/81 D.S.17-7 6/4/81 FDC FDC/CNL DIL/SFL BHCS CPL (cyberlook) I-~ 3 ENG ~ 2 GEOL ~TAT TEC -STAT TEC- Run 1 ~'' & 5 Run 1 5" Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering T~ra~smittal fJ366 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO Oil and Gas Company is a Division of AtlanticRichfieidCompany ARGO Alaska, Inc. Post OIlice Box 360 Anchorag,: 'lsl:n Telepho,',e . 27, June 22, 1981 Hr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject' DS 4-13 DS 5-1 DS 12-9 DS 12-10 DS 13-12 DS 14-18 DS 14-19 DS 16-6 DS 16-13 A-1 B-3 C-8 Dear Sir' Enclosed please find' / 1.) The subsequent sundries for DS'~4-13 & DS 5-1. ./ 2.) ,,The monthly reports for DS 12110, DS 14~19, DS 16!t3~ DS 17-7, A-1 & B-3'./ , · , ", DS 16-6 3 ) The completion reports for DS 1219 DS t3-}2 DS 141'i8, N,B-2 & C-8}/ . ~x~/ "'"' ',?/ 4.) ~'The-'Gyroscopic Surveys for DS 12-9,' DS' 1'~%$, DS 16'L~ :& C-8. S i ncerely~~.,~ /~/2- P.A. VanDusen District Drilling Engineer PAV/KJG'sr Enclosure ~i STATE OF ALASKA (~ ALASKA _AND GAS CONSERVATION C ,~IlSSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [~ Workover operation [] 2. Name of operator ARCO Al aska, I nc. 3. Address P.O. Box 360, Anchorage, AK 99510 Location of Well at surface 2242'FNL, 930'FWL, Sec 22, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 7!' RKB 6. Lease Designation and Serial No. ADL 28331 7. Permit No. 81-66 8. APl Number so-029-20596 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. DS 17-7 11. Field and Pool Prudhoe Ba~v Field Prudhoe 0il Pool For the Month of May ,1981 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spuded well @ 1230 hrs, 5/17/81. Running 9-5/8" csg, as of 5/31/81. .See attached Drilling History. 13. Casing or liner run and quantities of cement, results of pressure tests .. 20" cond @ 80'. Cmtd w/300 sx Permafrost. 13-3/8" csg @ 2687'. Cmtd w/3000 sx Fondu & 850 sx Permafrost II. See attached Drilling History. 14. Coring resume and brief description N/a 15. Logs run and depth where run None to date. ;16. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 'S,GNED,.'~/~, ~)~_ T,TLE Dist. Drilling Engineer DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in plicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in dupliCate DS 17-7 DRILLING HISTORY NU 20" riser. Spudded well @ 1230 hrs, 5/17/81. Drld 17½" hole to 2700'. Ran 66 jts 13-3/8" 72#/ft L-80 csg w/shoe @ 2687' Cmtd 13-3/8" csg w/3000 sx Fondu & 400 sx Permafrost II. Cm~d top job w/450 sx Permafrost. ND 20" riser. Instld 13-3/8" pack- off & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 12¼" hole to 9985'. Running 9-5/8" csg, as of 5/31/81. ARCO Oil and Gas Company North Alasl ,istrict Post Otlice Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer June 19. 1981 Reference; ARCO Cased Hole Finals '-I' 4 ENG '1 GEOL ---2 '~-'EOL I~_ . SGEOL _. STAT TEC__ _ _ ~ 'Z h7 T__~ FILE: ............ D.S. 1-8 4-22-81 CNL run 2 ,. .. D.S. 5-1 4-25-81 CCL/Perf record run 1 5" '~'".~' D.S. 5-7 4-22-81 CNL run 6 5",(,-" c,' D.S. 5-10 4-26-81 Gamma Ray run 1 (since workover) D.So 5-14 4-8-81 EPL run 2 5" U/// D.S. 16-12 4-10-81 CNL run 1 5" D.S. 16-12 4-11-81 Perforating Depth Control run 1 5" ;.---~,.,~' 6-4-81 CNL run 1 5" ._ . . ,, Please sign and return the attached copy as receipt of data. Kelly McFarland North Engineering Tr'ansmittal .J/ 365 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ALASKA OIL AND GAS CONSERVATION COMMISSION Hoyle H. Hamilton Chairman Thru: Lonnie C. Smith Commissioner May 29, 1981 Harold R. Hawkins Petroleum Inspector Witness B.O.P.E. Test on ARCO, D.S. 17-7 Sec. 22, TllN, R15E, UM Permit #81-66. 1981~ I left Anchorage at 7:30 AM, by Wien Airlines, to Pru~ Bay arriving at 9~40 AM and at D.S. 17-7 at 10:30 AM. when I arrived at.~the location, the 13 3/8" surface pipe was run and cemeht.ing was in process. While cementing was in process, I witnessed the test on the choke manifold. May_.. 20, 1981: I witnessed the B.O.P.E. test, there were no faileres. I filled out an A.O.G.C.C. report (attached). In summary, I witnessed the B.O.P.E. test on Arco's Well No. D.S. 17-7. The B.O.P.E. test's were satisfactory. HRH~mm 'O&G #4 :~/81 .... STATE OF ALASKA ALASKA OIL & ~AS CONSERVATION CCMMISSION B .0. P.E. Inspection Report .Inspector Date Operator. /~..~. ~'~ Well /'7-- ? Location: Sec ~ % T/~a. /~'~m Eril linq Contractor Representative ~~asing Set @ 2~ ~7 ft. Rig # 3._5'"' 'Representative Location, Genera] ~//~ Well Sign d ,~' Ceneral Housekeeping_ _ 6~(/ Reserve pit ..... M_ZQ~ BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves.__ H.C.R. Valve--__ Kil I ~,~ ne Valves Check Valve Test Pressure ACCT~UIATOR SYSTEM Ful 1 Charge Pres sure ~.D ~ O Pressure After Closure Pump incr. clos. pres. 200 psig Full charge Pressure Attained: psig psig ---- min~ sec. ~ min i~(9 sec. Contmls: Master · Remote Kelly and -Floor Safety Valves Upper Kelly., Test Pressure Lo~r Kelly ' Ball Type ~' .__ Ins ide BOP- Choke Manifold · '/3. NO. flanges . ~'~'"V Adjustable C%~okes ~ HydrauiCally- operated choke Test Pressure _~0 ~:~ ~:~ .Test Pressure 0)[ '.~//~ ~est mes~r~ ~/C ~/~ Test ~essure ~ ~ ~ Test Results: Failures ,~ 0 ./3 ~ Test Time' 3 hrs.,. ~ · . Repair or Replacement of failed equipment to he made within days and Inspector/Ccmmission office notified. Remarks: .~/~2~. ~/ /~-- 0 ~ /~ ...f'~/,?3 7- _._ fi, ¢' D . . J ;4 ~ ~_~ , £ ~ ~ ~ ,/ r. ~'~; ?... · 77£ r'_r . ? zs c Distribution orig. - AO ,&~CC cc - Operator cc - Supervisor Inspector. May 12, 1981 Mr. P. A. VanDusen District Drilling Engineer ARCO Alaska, Inc. P. O. Box 360 Anchorage, Alaska 99510 Re: Prudhoe Bay Unit DS 17-7 ARCO Alaska, Inc. Permit No. 81-66 Sur. Loc.: 2242'FNL, 930'F~IL, Sec 22, T10N, R15E, UM. Bottomhole Loc.~ 1710'FSL, 1721'FWL, Sec 15, T10N, R15E, UM. Dear Mr. VanDusen: Enclosed is the approved application for permit to drill the above reference4 well. Well samples and a mud log are not required. A directional survey is required.. If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been ' t classified as lmportan for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Ch.apter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to Mr. P. A. VanDusen Prudhoe Bay Unit DS 17-7 -2- May 12, 1981 commencing operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified, so that a repre- sentative of the commission may be present to witness testing of blowout preventer equipment before surface casing shoe is dri 1 led. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very' truly yours, H. Hamilton Chairman of BY ORD,90~. T~E COMM~$S~O~ Alaska Oil & Gas. Conservation C~amission Enc 1 osure cc.. Department of. Fish &. Ga~, Habitat Section w/o encl. Department of Environmental Conservation w/o/encl. ARCO Alaska, Inc. Post Office B~ 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 4, 1981 Mr. Hoyl e Hami 1 ton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 17-7 Permit to Drill Dear Sir: Enclosed please find our application fOr Permit to Drill DS 17-7 and the required $100 filing fee. Attachments to the application include a plat detailing the section and plan views .of the proposed wellbore, a proximity plat showing the subject wellbore's position .to the nearest well drilled, and a sketch and description of the BOP equipment and testing~ procedure,, including anticipated pressures. As confirmed in previous correspondence from your office, the requirement of using a surface hole diverter system on this well has been waived. There are no existing wells within 200 feet. As we anticipate spudding this well on or around May 25,, 1981, your prompt review of this application would be greatly appreciated. Very truly yours, P. A. VanDusen District Drilling Engineer PAV/SLB:sp Enclosures ARCO Alaska, Inc. is a Subsidiar'~ of AtlanticRichfieldCompany STATE Of ALASKA ALASKA O(~_ AND GAS CONSERVATION COI~',ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL IX-] lb. Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC [] REDRILL [] DEVELOPMENT OIL E~ SINGLE ZONE E~ DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE [] 2. Name of operator ARCO Alaska, Inc. 3. Address P.O. Box 360, Anchorage, Alaska 99510 4. Location of well at surface 9. Unit or lease name 2242'FNL, 930'FWL, Sec 22, TION, R15E, UN At top of proposed producing interval R E {~ ~ ~ V ~ ~ Prudhoe Bay Unit LI0. Well number 1312'FSL, 1641'FWL, Sec 15, TION, R15E, UM DS 17-7 At total depth MAY -- 8 ]~111' Field and pool " 1710'FSL, 1721'FWL, Sec 15, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation aA~!~(~10~& G2~ Cons. 0(,rllr~j~"~l~1Oe Bay Fi el d 71' RKBI ADL 28331 Anch0re~e vruQnoe 0il Pool 12. Bond information (see ~0 AAC 25.025) ' Type Statewide Suretvand/ornumberFed Ins Co 8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance. to nearest drilling or completed ENE Deadhorse, AK 5 miles 3640 feet well 2820 feet' 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 10,678'MD, 9491' TVD feet 2560 May 25, 1981 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3930 ' psig@ Surface .... KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 34 °l (see 20 AAC 25.035 (c) (2) ~ psig@ 9491ft. TD(TVD) 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER ~ SETTING DEPTH 'QUANTITY OF CEMENT Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOMTVD (include stage data) ~ "' ' 30 20 94# H-40 Wel'ded 80 32 I 32 112 ll2 275sx PF I t© surf. 17~ 13-3/8 72# N-80 BUTT 2619 31 ~ 31 2650 2650 2300 Fondu + 400 PF t( I 12¼ 9-5/8 47# L-80 ~ BUTT 9709 30 , 30 9709 '8687 'Stg 1-500 sx 'Class G S00-95 'BUTT ~ I Stg 2-300 Sx PF I . 8~ 7 29# L-80 BUTT 1269 9409' i~ 8438 10678 II 9491 400 sx ClaSs G ..... 22. Describe proposed program: ARCO Alaska, Inc. proposed to directionally drill this well to 10,678'MD (9491'TVD) to produce the Sadlerochit zone. Logs will be run across, selected intervals. A'13-5/8"' 5000 psi RSRRA BOP stack will be installed and tested to 5000 psi. The BOP equiPment will be pressure tested each week and operationally tested each trip. A string of 5½" 17# L-80 tubing, packer and necessary provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all uncemented annuli within the perma- frost interval. The packer will be set above the Sadlerochit. A separate Sundry Notice will be submitted when. the well is to be perforated. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge The space [~elow for Commission use v CONDITIONS OF APPROVAL Samples required Mud log required Directional Survey required APl number []YES ~lql O []YES [~10 .~YES []NO 50-- Permit number Approval date I~/-(~(~ SEE COVER LETTER FOR OTHER REQUIREMENTS n~/1~/~1 I ' APPROVED BY ,COMMISSIONER DATE ~.x] 12; 198! . by order of the Commission sul Form 10-401 Submit in triplicate Rev. 7-1-80 FiRCO RLRSKR, INC, '-'~ '"--' DS 1'7, NELL NO: '/ PROPOSEB '~;7 $CRLF 1 IN, '=-F,_,_,Je~-Me~ ....... -- PRUDHOE 8RY. NGRTH SLGPE. RLRSXR ' ;_-.. 77- ;;" ;.;' ';L_' .......... ~ ................. ', ...... f .... ~ ......; ..... ~ ....... - -:.;-.:;/;.";' z;;:z--;.:/7:. ;:'-.'[;;.-'7;;T.;.;'T; .... ..7.TZ?TTZ-: ...... ~ ......... - ': .....a.i ..... ;.: ..... '_~.__:.Z;~.'J~__~--L_-~[': ...... ': :.. ";.--..'_':_:..Z::;::;;:Z::;:.:;~.:::_:' ;- ::'. ..... -. : : .... :..-.--.- - -..-:::.1 :;;::".: :.". ..... .: ..... ~F~ - ";" -; . ;; :i.: -:_"; ;7'7;7 :--_TT:';Z; :_t'--T-'~--7';T~':T~Z~';~;~7'Z'ZT-7~-~i 777-';TZL. %qZ--FZ '7'-:---;-;'.; ...... Z;7-F-L.7--T. LZ; 77 ;~7;q 7.-:7 . ........ ' .......................... Z ...:... . .' ....... ;.;7"';_ '". :'; ...... _ :~::_ ===== = === ====================== --: NOTE= NO ~[STING'~LS-~ ................ i- :f:::~::-: ::::::::::::::::::::::::::::::::::: .- ..... ~]~]N ~ ~ .... ::.~ .......... ~ .......... :-~:::: :-:: LI'::;EE~.;~;d:.~E371'E~;~:ES~%:~::~E¢~E~E:"~-::: ;": :-:'~- .: :'--"~ ~-:?-'*~ ::::- -!-/ ':'-~ ::::::::::::::::::::::::: :':': ':' '- : ..... -t-~----l- ..... ~ .... ~---,-:--,- :----__h_ ~. ¢_2:2 '-:L::i--:-:.--B'T_._T', :.:2_-:: :_.::./_: :-~-'--: ~ .... .... ,---:--.-, ......... ~ .... , -.-~ ~-..-:--F.-:---;-:::-:; :'::: _. ' .... '77:::: 2:_~::::':'2:.'-: ' ~-'":':';". / ..... :~ ..... T:-4 ..... : ~-:~::.', .... :::::::::::::::::::::::::::: .... .................................. ~ .................................................................. ~ .... ::::: ::::::::::::::::::::::::: :-::-.: ~ -: -~ .... , ===================================== .... ..... :?,.. -.-t ....... : ..... :t .... ~------'-~-~ .......... :-::: :-f'. ............ :--:F.::':: ::::::::::: ::::::: :::: :::: ~'~:~'~' ::~-::::~-:::: ~:.'~-::~;_fZZ~Z-}.::::~ ....: ======================~-~-:.--~ .... ~ ....... h---:.-f .... : F'z-::~ ~'-: :':~:: ~.:-:: :. :::::::::::::::::::::::: .'-?:: :::::::::::::::::::::::::::::::::::::: :_::: ::::-::---.:; -' :-.::,:.: .-: :. ~ ..................... ===================== [0:': :'~] :.:.::.7:::':: :::- :::::::::::::::::::::::::::::::::::::: :.:.:-;:.: - ; -.: -; :: :.:-. ~ .:.:::: ...... ..?__::.:- .... :' :_.: .... :::- ::.::::::. :__::::::_::: :'._:.'_:.::::: .:........ : '. - 3500 4000. .................. ' ........................... :::: _£.:! _'.:.': ~..~: :'7:_:_F.:: '. 'i. :. ::: ' ': 4..- ~. , ~ ..... :":.:' N I 1'- DEG 19'MIN: ::::::::::::::::::::::::::-t:::::::::::::::: .......... ::-:-~ ~---~ .................... ..... !-"::: ::'::::-:: i ' .;..' .... 3.8;34. FT ~..(T.O_:..TRB~ET~! ::_-~::.::::.i.::-:-:L--:~.-.~:-.~i ' ~:::L.'._$500 ._ ' ..... : .:. :-2_..: ............. ~ .............. , - ~ .... , ; ~ ..... ~ ..... , ................. ~ ...................... ~ .......................... ; ......~ ................. , ............. ~ ...... ' 2 . : __::::; ~ :':': :".':: :: '--'~- -,~ ; ! ..... :' -:~ ..... ? ..... ;-.-: :':;-~'-:-:::.::::;'::-~":':': ::::':: ~:.::":::. :::::' :':!":'-':: .} :':::':'-:-:::'.':' ' ~ :'-:_::-~' :~::_:.':';. :7'::"".' :::::' ':-_: _--:~:.-:: -..-:... ============================== :';: ' 'i ........ ~":"' ' ": ~':'' ::'-:":: ~ ': :~::..'-.; ::::: f.:7-:::: ;4':;::-':~.:'7::::;:~: :':::~:::7::,;': :';'.:11::; :'.~ ::_:::;::::': :".: ::: I ......... t ' ":'~: ' ....i ......~ ......i- ...... ~ .... { ......~ ............ .T:::.' ~" '- i :~::'~': .... :'::. ::-7--:::':. ~. ~'::-~ ....... ~.~~-'-:-:-:.~ ...... ? .....~-: .....+ ........ ' --.~ ........ ; ~ ........... :~ ......_' ...... __~_.: .... ~__Z_ .; .... .-- . -'. . .. :. : .. : ! .... . .... ' ..'.:; :':'"}".:::':':'!::":::"::"7":' '}'::': .... ::'i'i.:":'":-:":'-. !:...7:-':'::".::':":':'! 2'-;,:" --:"I' ;:'";:.-:.-: !:'-;::'::!.:7:.-'-'1:7-.::-:'~ 7L":'~:-":.-::! ..... :T: "!.~, ...... $ooo. ' .... "' " :-~ ' :' ....... ": RVERR6E RN6LE : ' -' _/r' .... ~' ' ' ........ - - ..... '. ....... '.:.':--'-.'v' .'-.-::. :: ...:": ':-' ..% . ..... : .... .......... i .................... :.:: ..... ...... ::: ................................. .L.'".: :-_''_....:.:.'..:::._.:!'::::'L'_.:_'..':::.::'.i:.::::,:--..' ,. ..... .... 33 BE6 56 ii:IN .:: :-----'l~,. I -'-'-;:--:..-:--.:i.';::: _::~-----.": 2': ....... . ........ : ..... :-~ ............... ~ ....... ! ........ ." .-i .....~ ...... ::: ....... :;'-.:'&'::-~:: ........ ~-.- .---.-h~:--: ........ :'.: F.:_:'£'L.;.:_2::: . '.: .'.".:~.L:':' '~_7:::":'~ ...... .......... :,~. ,.::. :::~_..-:::.-~- .... :.~ ............. ~..,~.._.: ....... ~..~i ...... ?? .......... .-~.:-:F-~.-~-~:~:: ..... ~ - '~l.iJ~ ....:,~::_.:::.~:::::+_ .... ~-_~ ,- .... .~:~ ......~-. ~':':" ~-":t · . ' ~ ........ ] ......... ?--~ ..... .-t- .... T-:-:' -T:L'r:!_-~'! ~'-'~ ...... :'~-:'~'-:"~ ~-r"'-T- .......'~"~i~"~'~-~'-'"~'~+ .... F ....... '-;-:- ........ f~ · ...... '~ ..... ~-.-~ .- ~ ........ '. ~.~ ...; ..... :.: ::: F~:':. :' F.:. ~ .:'..:.::~:: ::T:':::: I:';':~ :::' F.:'::.-::-~:-:- ~, .::::~:~::-:'::: i:~:~::'~.~ !": ::::.:'- :A.'~:_~::::::'~-::: :'~-+'~:_':_~:: '::::r' 't'":': "~ ..... ;::"~':-::'~' · '"-~'f~i--'~'~'~":"-~--': --:'~: ..... ~:t:):::--"L:. :::-::;: :-: ~: .... :-:-..., ......... :-'.'--'--~.~-~ L:--~...~_~_ ~-:-:- --T --.~ ......... ~ ~ .......................... ~-"---:~ ...... --+-,.-.-~ ..... -~- -~---~ .... ~.--~-.--~-~-~ :::::::::::::::::::::::::::::::::::::::::::::::::: ........ , ........ .... ........ .... ...... ...... , ..... .... L ........ { ' 'I ' ~ -:--' -~ ~ ..... '---:"-' ....... r ........ ~ ' ~ ............. ~'" .............. ' .................. ............ ~ ..... :[::t .... ..... ;~-'::-'"::~' ~ .... .:::_,+.::_.,::_+L:: -! ...... T----!~.-.,.'-~-~' ...... "--- ...... ........... ~ ........... ~ ...... t ' 't-:'~' -':' -~'-- ' ~'"+"+-;'":: ~ -~':-'-' * · , .~ '~"----- - ~"--'~--~ ..... '~- '-,~-~'--' ~--. ...... --'---;- ~ .... ~. ........ ~-~.---~ ...... 4.-. ....... ~ ...... t-' '~-,~"T--. ........... ' :.~,_~_.;_..~ .... ~ - ~ ~ ~...,.,.~ .~._~.:__+_: ..~..,._F___~ .... ~ -. -." r"~- -:-:-~ ...... ~'- '-'?','- ..... ~ :"":'"~--~ ........ : ~, -:---~-'r.! ........ .... ~_..~.~ ............ ~. ............... ~ ............ ~ ...... ~ ...... ._: ..... , --~ ...... -~ ,-h'T",'""~' T'--' , '-----?-"T" L.. ~ ' --"r------ ,'"--T---- ~'"--'~ ~ i ?~':'-'-~ ...... '_1' ................ f ........ ~ ......~ ........ ~ ..... ~...:.~ +:: - ~-.:::::':T_.~::.% :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~--~ 71 .... --~ ..... · :~:"--:~ ~::."i: ::t :' i ':'~:~'-.---~'!!i~:'?~!'!:~'~ :' !:-:i!..: :!'i:{' :'£:'---':: ':': ::':: ::'~i~i'::: ~!: ~ :;'"-: ::: :':: :'...i K-lO TVD=~?$' ~D=80~O DE~=~54~- :-: ,~::::~-~-?-!~-:i:':!:-:--'?-'~{':l:!::-:~:'~-'~ :::-:-~--': ~-~:::~-:::-: 'i-: :':'.:-i-:: ::~L' :~'!': · '-i ..-': - ~: .... :":' ! ;:-'~:' ~ ...... .:- :' -'. i; ' :': -: .": ! :: :'. ::::'~::'~:::. ':?:_:: ~. ':::::~'::'.~':'.i :_::~:.~-.: :'":: ::..: '-;-:'::: :: '_: 2:_. ~500t" .:.:._?:'.L:.L.'_:_:': .'~::.:.L.'.i ::.L_ ~:~{-7 :::::::::::::::::::::::::::::::::::i-~:£:' i: !~'--:. i'~:".-..-i!i L~".:::' ::: :7' ?2.:_ ~ _ · . ~ -i ........... ~ !' -':---~:%--~ ..... ~.--::---~---:-~'T':7-::~:::::~ ~~_:_-: :~\:'7_.: ::::::::::::::::::::::::::::::::::::::::::::::::::: ........ ::' ! ~:---: %- :-~':-:.:::-:-::.- ':-::.-:~:-::--:-'.::::'.~:.-.:----::::.::. :- :~:.:::- :: '...-- .~.: .:...-. : "!:~.":~: :-?:-.~---: ........ _::-i:::~:-:-:--~F.--:-~ ...... i._:_....._~ ...... :~.::.:...:..; .... ; ..... .'.. .... ~.! ....... ~.,:::-:::: ~': . ,o......, .:,. ........ .; ..... ............ ... :. ..... ._....... ._.. : ..~..:'. O~ ~'_.._.:: -'_:~.L_L_'__::::.::;_':'L+::: ...... :-:-:_.:.~_.'._:2..:: :. "' :: :._.L_\_. :.:.:.:~_.i.. ::....: ..... --..':-::: ::. ':-.: :: ::. _'_. ___: ~_ '._L'. ...... +- :-- ................ ::t' .............. : ......:" ...... ~ ......... ~ ........ ~...~., ~-:~ i~ . ~-5 TVD--80S8 T~D=8~9~ DEP=~OS~ :: ':-~_: :.-:: :':-:':.-~ -:-: : 0 --:.'.'i--:'--:::-:.'-:.::' .... :' ' ':'~:--":"::: ' X K-! T~-~=~SO! T~:~=S$O?DE-~=3433" :' ..... .... - '_:-_": '..::--~':- : ....... ' " A~Or~O~' g ............. ' ~ '~R$ .... ~VER TV,3--~'785 T,~=SS~O DFJ='-~55'/ - . .. X/..SHUBL~K TV0=8805 T110=9854 DEP=35'/I -- ~ TRR6ET [TOP SRB) TVB=8886 TMB=9951 BEP=3624  13/14 CONTRCT TYD=911t .TI1D=1022~ ..... ': ..- . , ..... :.--:':..: --"' ." - ' .. - : :L ......... :" .......... ._ 9500 i i i i i i · 0 500 I000 1500 . 2000 2SDO 8000 · VERT'ICRL SECTION ........... BRSE $~D TVD=9385 TMD=10558 DEP=395! . %%, TO TVD=9481TMD=10688 0EP=4025 ......... ~_..: ................. 3500 4000 4500 LIaBlE TVO=S~4$ TV,.9.=IC,8~? 0~2=41~ - ,:,c£'.:..-.ula'_3r C,!3~ci;v 'eSt RE£E[YED Gas Cons. 12. 13. Check and fill accumula~sr ._~-_r,oir .'.a 2rcser level with hydr_~uli' flai.=. 14. 15. 16. Assure that. accu.-.,uia~or ~ °~'*""° .~ ~r ...... is ~°3O wich 15C3 psi dc:-:ns-*=*.,~.m of %ne reguia[sr. Observe time, then close all units simu! eously and record the time and pressure re- maining after all units are closed with charging pump off. Record on IADC report. (The acceptable lo~zer limit is 45 seconds closing :ime and I2CO psi remaining pressure.) 13-5/8" BO? Stack Test Fill BOP stack and manifold with & non- freezing liquid. · . Check that all hold down screws are fully re- tracted. Predetermine depth plug will seat & mark running joint. Run test plug on drill pipe and seat in wellhead. Run in lock down screws in head. · Close annular preventer and chokes and bypass valves on manifold. In each of the following tests, first hol'~ ~- 250 psi low pressure test for a minimum of 3 minutes, then test at the high pressure. Incre. ase"~essure to 3000 psi a~d hold for a mini,~rdm-..o¢ ~,minutes. Bleed pressure to zero. Open annular preventer and close top set of pis --rams. Increase pressure to 5000 psi & hold fo~ at least 3 minutes. Bleed pressure to zero. ClOse valves directly upstream of chokes & ope~ chokes. Increase press, to 5000 psi & hold fo~ at least 3 min. Bleed pressure to zero. Open top set of pipe rams then close bottom se' of-pipe rams. Increase press, to 5000 psi bel~ the bottom set of pipe rams & hold for at leas' 3 minutes. Test remaining untested manifol~ valves (if any) with 5000 psi upstream of valve and zero pressure downstream. · ."-~.. ... Bleed pressure to zero. Open bottom set Of pipe rams. · .. Back off running joint and pull ou{ of hole. Close blind rams and test to 5000 psi for at least 3 minutes. . Bleed pressure off all equipment. Open blind rams. Nake sure manifold & lines are full of non-freezing liquid and all valves are set in drilling position. Test standpipe valves to 500~ psi. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. · Check operation of De Gasser. Record test information on Blowout preventer test form. Sign and send to Drilling Super, " 17.. Perform complete BOPE test once ~ 'w~ek and · .: .. . ....,.~,~...... :L,%"':.:-,.' . ,Z..:;.?:-:"..":.'.:;'.'.. ' functional o2erate BOPE daily .............. '.: - .' .-'-"-':& ',C. :.;'Z.-:..:~',~ -~ :~. ~.?.-.,,-'.,: -' ~ ~-,' -"..~- 2..~: ,~ .... '.... ,. ..... -~' .... . .. . . .' -.-?C · ... · : - '.: Z..; ii ii i lllli ii i ii I I iiii iii iii [ I HEREBY CERTI~ THAT I AM ~ PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF A~S~ AND THAT THIS PLAT REPRESENTS AN AS-BUILT SURVEY' L MADE BY ME, AND THAT ALL , ,, ~ ......... _ ~~~ ' ~ ~ ee~eeeee D.S. 17 - CONDUCTORS 7 THRU 1 1 ' ~N, &S-BUILT LOCATIONS.. , ~,'F49th ~ STATE PLANE, LAT & LONG ~,~ ~-~~-~~-~. LAT = 70~]2'27.70i'' LAT = 70~2'2~.2h8'' -'tl"~~'~:~.. CEL~R BOX ELEV = 36.5' C[LLA~ BOX ELEV = 37.1'~--~~~ 8. Y = 5,~28,28h. 55 ] ]. Y = 5,~27,~35.32 x= [o~,2o~.6o x = Zo~,=87.76 LAT = 70 ~2'26.552" LAT = 70'~2'23'0~5" . __ LONG = lhS°]8'hT.]~]''- LONG = i~8~8'~5.0~]'' cELL . Box LEV = CELL . BOX ELEV = x = ~o~,23].6~ LAT = 7o~ 12' 2S. 3~S" Alaska 0~l & Gas Corns. Commission .LONG ' 1h8°18'h6.h71" .Anchorags CELLAR BOX ELEV = 37.0' I I ~1 I II Ill I I I I Ill I II Ill AtlanticRichfieldCompany ~ DATE: DRAWING NORTH AMERICAN PRODUCING DIVISION ~.~.~ ALASKA DISTRICT - PRUDHOE BAY . I I I llllll I ,Il Illl I II [ I II Ill Illlll Ill I I II J I I I CHECK LIST FOR ~rEW WELL PERMITS Company Lease & Well No. IT~ APPROVE DATE (1) Fee ~.~ (2 thru 8) (3) Admin(/~ 11) (4) Casg ~ (12 thru 20) e 3. 4. 5. 6. 7. 8. e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. YES NO Is the permit fee attached .......................................... Is ~11 to be located in a defined pool ............................. Is ~11 located proper distance from property line . Is ~11 located proper distance from other ~lls .................... Is sufficient undedicated acreage available in this pool ............ Is ~11 to be deviated and is ~11 bore plat included ............... Is operator the only affected party ................................. ~_~ Can permit be approved before ten-day ~ait .......................... Does operator have a bond in force ................................. ~_~ Is a conservation order needed ...................................... / Is administrative approval needed ................................... Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement co~r all known prcductive horizons ..................... Will surface casing protect fresh vater zones ....................... Will all casing give adequate safety in collapse, tension and burst.. Is this ~11 to be kicked off from an existing %~llbore ............. Is old wellbore abandonment procedure included on 10-403 .......... ,. Is adequate ~11 bore separation proposed ........................... PJ~IARKS (5) Bo~ iD 5-r2-8~ (21 thru 24) 21. 22. 23. 24. Is a diverter system required .' ..... ' ................................. Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to ~D6~ psig .. Does the choke manifold comply w/API RP-53 (Feb. 78), ................. (6) Add___L: ~... 5- / 2-2l 25. Additional requirements ............................................. Additional Remarks: Ceology: Enging~.~.~ing: . % WVA ,/~;; JRT' -RAD ~ rev:"' 03/10/81 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX.' ., No special'effort has been made to chronologically organize this category of information. oo LIBRARY TAPE Ci~VE SPECIFICATIONS Company Arco Alaska, Inc. Well DS 17-7 'F~eld Prudhoe Bay County, State North Slope, ;laska Date 8/13/81 Curve Name (Abbrev.) Standard Curve Name Logs Used CN/Muttispaced Scale 60-0 0-1000 O-1000 0-100 100-200 CN LS SS GR Compensated Neutron L?.~.paced CN/Multispaced Short. Spaced CN/MUltispaced G au~r~a Ray CN/Multispaced Company Arco Oil ~ Gas Well DS 17-7 LIBRARY TAPE CURVE SPECIFICATIONS FieId Prudhoe Bay County,State North Slope, Alaska Date 9-3-81 Curve Name (Abbrevialed} Standard Curve Name Logs Used Scale ,, GR Gamma Ray CN/MS 0-100 LS Long Spa,ce, CN/MS 0-2000 SS ,,, Short Space CN/,,MS 0-2000. ...... CN 'Compensated Neutron CN/MS 60-0 · .. , , ,, : ,,, , , . 1 1 PA6E I ARCO ALASKA .... DRILL~ S[T£~ 17-7 PRUDHOE BAY----N. SLOPEi., ALASKA DATA EVER~ ! SA~PL£S ,.3¸ 925 590 5'0 3,~+:' 925 925t 925 50 PA6E: 2 ARCO ALASKA----DRZLL! SXT£: 17"7 PRUDHOE BAY'---N. SLOP£'t ALASKA DATA £V~RY ~27 O0 i 5~5 ...... ~A~O0 90~18 5~6: 72" 511~82~ :55,26 927#. O0 88.70 5q, 9'. 99 ~17' ~8~ ~. 9E~ O0 ~0~ 0,5 587' 01~ 76 9279'00i 10 928, 00~ 92:8 O0 . PA~E 3 ARCO ALASKA .... DRILL~ SITE 17-7 PRUDHOE' BAY .... N, SL'OPE:~ ALASKA DATA ~V~RY . ~ SAmPLeS GR SS. -----LS __ 9291_,0e~ 9~:,83._ 589;55~ 5'50,$1 .... PAGE:. q. ARCO ALASKA----DRILL! S]:T£ 17-7 PRUDHOE: BAY----N' SLDP£:t AL!ASKA DATA _~V~RY 1 SA~PL'r~. 932 67 3l 9~523.00' 95,68 557'90' 528.29 3~.q. 5 ~ 9'~25, O0: 92~69 562. 30~ ~ 07' ~5-21 ~ ....... : 9:326,00 9~.,:67' 565'57' 52~,5~': ~. 35~05:: 93E7',00 I00 90 5a'&~, 30: 5~' 09~' 3:~'73' 932! O0 ~ '9330,00: 933 0 O: 953 O0 i 3- 00 LIBRA~RY TAPE CURVE SPECIFICATIONS Field PR~DHOE B~Y .... ~ ~ .~, ~... ' County, Sta~e NORTH PAGE 1 OF 2 ECC# 3386 Date 5/19/88 DELIVERY DATE 5/26/88 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale CCL LS SS G1 GLES G2 GR BKL ' BKS MON CSS ISS MSD SGMA RATO FILES 1-3 Casing Collar Locator PDK-100 400-600 Long Space " 0-2700 ShOrt Space Gate 1 Gate 2 Gamma Ray Background Lonq Space~ Background Short Soace Monitor " ~apture Short Space " Inelastic Short Space Mean Std. Dev. Sigma Ratio of CamtureCounts RICS Ratio or Inelastic to Captu] RIN Ratio of Inelastics -6000-54000, ~-72000 )-%,2000 )-30O )-3oo 8-0 60-0 33-3 43-0 , 14-4 3 to -1 RBOR Borehole Ratio " Page 2 of 2 LIBRARY TAPE CURVE SPECIFICATIONS Company ARCO Alaska~ Inc. Well D.S. 17-7 £CC# 3386 Field Prudhoe Bay County, State North Slope, Alaska Date 5/19/88 · DELIVERY DATE 5/26/88 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale FILE 4 SGAV Average Sigma PDK-100 60-0 RNAV Average RIN " 14- 4 RCAV Average RICS " 43-0 RTAV Average .Ratio Gamma Ray Pass 1 33-3 GR " 0-100 ** REEL HEADER ** REEL NAME : DATE : ...... ORIGIN : FSYS SERVICE NAME: BITLiS REEL CONTINUATION NUMBER: 01 PREVIOUS REEL NAM: : COMMmNTS:. 9RESS=R. ATLAS LIS CUSTO~,,. T~PE --- CREAT=~ ~Y SDS PROGRAM ,,' ..... LENGTH: 132 BYTES ** TaPE HE&DER ** TAPE NaME : DATE : ...... ORIGIN : FSYS SERVICE N~ME: BASEGR TAPE CONTINUaTiON NUMEER: 01 PREVIOUS TAPE NAME : COMMENTS: LENGTH: 132 BYTES ** FILE FILE NAME: B&SEG~.O01 ~cERV~CE~ NAM:.: VERSION ~ : ! D~TE: ~5/11/2C M~X RECORC LENGTH: !C~ BYT=S FILE TYPE: LC PREVIOUS FILE N~YE: . ** IN~=ORMATICN ~:CORDS ~ MNEM CGNT:NTS AP!N : 5C029205':6-0C CN : ARC,~ WN : DS 17-7 FN : PRUD~3E ~&Y COUN : NORTH SLOP~ STAT : LrC~ : 1S0.~,~] ** FORM4T ** UN=TS.= ENTRY BLOCKS TYP: ENTRY DESCRIPTION 8 9 11 0 II~I/iI I DEPTHS OECRE~,S: 6C.0 FRAME S~CIN,S .lIN FRAME SP~CING UNITS 12 MAXIMUM FR&~ES/RECORC TERMiN~TOR -0.500 LEVEL SPACING DATUM SPECIF!C&TZON SLOCKS CURVE REDR NAM: CO9~ SIZE S.~MPLE U*~iTS iii-- ~UmVE rCDE~ ..c~Z= SAMPL[ UNTTS. CCL 68 4 I DIM LS ~ 4 1 C~S G1 5S 4 1 C~S G2 68 4 ! CPS MON 58 4 I CPS BKS 66 4 I CPS ISS 68 4 I CPS MS~ 58 4 I SU RSOR 68 4 1 RICS 63 4 1 FORMAT ** S$D ~8 4 I F/MN SS 68 4 I CmS GElS 68 4 I CPS GR 68 4 1 ~KL 6~ 4 I CPS CS$ ~ 4 1 SGM~ 6~ 4 I SU ~TO 68 4 I DiM RiN 63 4 I DiM ENTRY ?.LOC~S TYPE ENTRY O=SCRIDTiON I m m m Imm 4. 1 ~EPTwS DEC~EASE 8 6S.0 ~ ~. ~E S~,-&C I NG ~ .lin FRAME S~CiNG UNITS 11 12 M.~XIYUM PRAMES/~ECOR~ 0 T~RFIN~TO~ -~,$00 LEVEL SmACING D~TU.M, SPECIr-i"&TION,~ BLOCK.S CURVE REmR N&ME COgE SiZ= S4MOLE UNITS -I--- I___ CCL 6~ 4 1 2IM LS 6~ 4 1 CPS G1 58 ~ 1 C$S G~ 6,3 4 I CPS MON 58 ~. I CPS ISS 68 4 1 C~S MSS 68 ¢ 1 SU RBOR 68 4 1 DIM ~ICS 58 4 1 DIM DEPTH 1~400v .gOn.. ,=*, z16~', .927C ~ CCL O.COO SPD 29.¢97 61 7.481 GElS 530742.100 MON O.GOO BKL 22.088 ISS 9.548 SGM~ 1 .~1 2 RBOR 1.2]7 RiN 0.000 DF-PTH 10330,CC0 PT 3139,4460 M CCL O.OOO SPO 30.434 61 18.~t3 GElS ~30032.200 MON 0.000 BKL 52.454 ISS 41.190 SGM'~ -119,263 LS G2 BKS M SS RICS LS G2 BKS MSD RICS LS G2 ~KS MSD C.OCC SS O.OOC GR 1~'.9~8 CSS *59 R~Tr' O.SO0 !2,145 SS 4,040 GR 39,294 CSS 4.186 R~TC 1.680 SAMPLE 1 1 ! 1 1 1 1 1 1 16,130 SS 25,164 GR 37.349 CSS 52.997 RATO ~ ~I.~ .... ; . UNITS ~/MN CPS C~$ SU DiM DIN` 0.000 22.083 O. 030 ~'~ 0 *~ '''~ 4.418 15.477 5.634 0.401 29,592 25.489 20,439 1,745 r .. 0EPTH 10200.000 FT 31 08.966C M CCL 0.000 G1 10.437 MON 0 iSS 16.976 RBOR I .215 OE~TH 10100.C00 FT SPD 30.747 LS GElS 218048.800 G2 6KL 40.525 BKS SGMA -212.217 MSO RIN 0.000 RICS CCL 0.000 G1 15.740 MON 0.000 IS$ 17.704 RBOR 1.221 DEPTH 10000.000 mT 3078.48~0 M SFD 30.997 LS G;1S 456752.320 G2 BKL 54.098 BKS SGMA -100.~34 HSD RIN ~.n COO ~ICS CCL O,OOO G1 7,100 MON C,O00 iSS 12.101 RBOR 5,318 DEPTH 9~25.500 FT i i i I i I 304~.... 306'.. .. 30 GElS 229238 BKL 77 RIN 0 3025.2990 M CCL O.CCO G1 19.9~8 GElS MON 0.030 BKL ISS O.CO0 SGMA RBOR 11.000 ~IN STARTING DEPTH :18453,000 FT ENDING DEPTH : 9925,500 FT -* ~ILE TRAILER ** FILE NAME: B~SEGR.O01 SERVICE NAME: VEPSION # : 1 OATE: ~5/11/ MAXIMUM LENGTh: ~024 FILE TYPE: LC NEXT FILE NAME: ** FILE HE6DER ~ 2 ** FiLE NAME: ~SS t.002 SErViCE NAME: VERSION # : ! DATE: 85/11/20 MAX RECORD LENGTH: 102~ ~SYTES ;iLE TYPE: LC ~REVIOUS FiLE N~: , ** IN:O"~ · ~,:ATICN RECORDS INC. MNEM CONTENTS APIN : 500292059~-00 CN : AqCC ~L~SK~, WN : OS 17-7 FN : P~UDHOE BAY · 30.997 LS 109.~$9 G2 19.995 EKS 5 · ~" M 0.00O ~ICS 3155,0~10 3025,2990 UNITS IIm/i 8.377 10.843 26.870 7.215 2.1~6 3~.7c2 8.71~ 65.809 48.755 3.02~. 23.539 6.58~ · 7.6C2 2.~S1 2g,9917 0.~7~ C,OCC SS GR CSS R~TO SS GR CSS R~TC SS CSS RSTO SS CSS R.~TO 5,2q7 22.332 7.7~1 0,626 5.96- 42.24g 5.,~50 .,.~ ,.,. 1~5 7,112 ~1,384 0 .~41 ~7.475 9.999 O.OOO ST~T LCC : ALASK~ : 150.00 ** FORMAT ** ENTRY BLOCKS TYPE ENTRY DESCRIPTION 4 I DEPTHS DECREASE 8 O~.O FRAME SPACING 9 .lIN FRAME SPACING UNITS 11 12 MAXIMUM FRAMES/RECORD 0 TERMINATOR -0.500 LEVEL SPACING DATUM SmECImlC~TION BLOCKS CURVE REDR NAME CODm SIZE SAMPL CCL 68 4 1 LS 68 4 1 G1 68 4 1 G2 68 ~ 1 MON 6~ 4 1 BKS 68 4 1 iSS 68 ~ 1 MSD 68 4 ! RBOR 68 4 1 RICS 68 ~ 1 ** mORM~T ** E UNITS D I M CPS C ~ .S DIM ~ I M ~:NTRv, "LOCKS~, TYPE ENTRY DESCRIPTION I III I I Ii I ! ! I i ! i ti ! m I i ~ I OEPT~S DECRE 8 6O.g FRAME SPACIN 9 ,lin F~AME SPACZN 11 12 Y,~XIMUM ~ TERMINATOR -O.$O0 L~VEL SPACZN III--itl G G UNITS ES/RECORD DATUM SPECi$IC~TION :BLOCKS CURVE REPR NaM= CODE SiZE S~MPLE UNITS I I ! i I i m I CCL 68 4 1 DIM LS 6.~ 4 1 C PS G1 68 4 1 CmS G2 68 4 1 CPS MON 68 4 1 CPS ~KS 68 4 I CPS iSS 68 4 1 CmS MSD 68 4 1 SU RBOR 68 & 1 RICS 68 4 I DATA ** CURVE NaME S=D SS GElS BKL ?, ~,SS SSM~ R~TO CURVE N~ME SPD SS GElS GR CSS SGM~ R~TO R~N C'" I I -- I COS:~ SIZE 4 4 SAMPLE 1 1 1 1 ! I I 1 1 SDMPLE 1 1 1 1 1 1 1 1 1 UNITS ~/~N C~.S CmS CPS SU DiM UNITS F/MN CPS C~S CPS ~.PI ~U ~IM CCL O,CO0 SPC 13.999 G1 7409.258 GElS 102.~59. 800 MON 40,9.¢6 8KL 29,991 I$S 311828,800 SG'.I~ 18,e'80 RBOR 1.777 R!N 12.33C O:PT~ 10300.CC0 =T 313~.z. 460', mil lmmmmmm mlml mm CCL O.OOO SPg 1/..072 ,:.-1 /'6':'4.21= G F-- 1S 1110'06 MON 51 .7.52 ~:<L 10~.Q95 I~S 321222.900 SGMA 19.23,3 REOR ! ,917 RZN 11 .71.5 DEPTH lO~OC 000 mT 31'''''~: 96~C m mm mm mmmmm mmm ! m--l-- mm CCL 0.003 SFD 13.999 G1 14473.4~0 GElS 120251.200 MON 55.~01 BKL 72 =S~ 341592 I~r, ~Gr4~ 1~ ~7~ RaO~ I .402 RIN 8.6S9 DEPTH 10000.00'"u FT. 3043.',.;-u60'""' 1'4 CCL C,O00 SPg 14.430 G1 4,718.738 6-15 113z, 76. 800 MON 4.R,. ~63 8. KL 180.C~2 !SS 32 C C 7,~. 1 r" 0,,, ,.~ "' !,,I ,¢.,..., ...,~., · ~6"'_ ~ RSOR 1 .549 RiN 8.792 DEPTH 9~25.500 FT 3025.29~0 H mlmmlmmmm----mm--m--.mm__--__m____mm______ CCL 0.'300 S~9 13.999 G1 6539.3~ GElS 11~92~.400 MON 36.996 BKL 179.9.~2 ZSS 31]~08.200 SGM~ 31.423 R~OR 1.445 RZN ~.723 LS G2 BKS MSS RI~'S~. LS G2 EKS MSD RICS LS BKS MSD RICS LS 82 BKS RIDS LS G2 :JKS MSS RiCS LS G2 BKS MS~ RiCS LS G2 BKS MSS RICS STARTING DEPT,~ :10453.000 FT 3186.081'0 M ENDING DEPTH : 9925.500 FT 3'325.2990 M ** FILE TRAILER ** FILE NAME: P~SS 1.002 SERVICE N4~E: VERSION # : 1 D~TE: 85/11/ MAXIMUM LENGTH: 1024 CTI IZ T'V:::)=, I ~ · . 1259.874 2C8g,791 549.945 0,260 17,o54 13~.764 275~.C75 122.5¢~ C.223 17,771 1171 2022,158 159,297 0,~41 18,:7.5 27~9.045 4107.387 154.~63 O.2ZC 1~_.271 "~6 CC6 4631.035 24~.226 C.245 12 3~ 1153,101 4S2 .JO8 268 .C73 C 17.1~5 1359.36~ 77~.022 249.975 C.236 15.327 SS GR CSS RATO SS CSS R4TO SS GR CSS RATO SS CSS RATC SS GR CSS RATO SS rcS RATC SS GR CSS R~TC 23747.630 16.730 17308.2:"0 1 8. 997 2~235.970 16.8~1 1316C.62G 17.368 22005. 300 24.85"',. 17293.230 19.173 ~5885.180 27837.050 16.697 4=972.060.. 29588.360 14.003 29~31.990 65.977 18668.~50 _mE.4Q¢. 56.881 ZC757.9~0 2~.Q7~ NEXT FILE NAME: ** FILE HE,~DER $ 3 ** FiLE N.~ME: PaSS 2.003 SERVICE NAME: VERSION # : 1 O~TE: $5/11/Z0 MAX RECORD LENG?M: 1024 BYTES FILE TYPE: LO PREVIOUS FILE N~E: . ** INFORMATION RECORDS ** MNEM CONTENTS CN : ARCO ALASKA, ~N : TS 17-7 FN : P~UDHOE COUN : NORT~ SLOPE STAT : AL~SK~ LCC : 15Q.OO * FORM2T ** INC. UNITS ~NTRY ~LOCKS TYPE lIlI & 1 8 9 .lIN 11 12 G -0.500 DATUM ENTRY DESCriPTION ~?HS DECREASE ~R~m S~ACING FR~: So~C!NG UNITS M.~XI~4UM FRAMES/RECC~D T~R~INATOR LEVEL SmACING SPECIFICATION BLOCKS CURVE REmR NAME COOE SIZE S~MPLE bNITS IIII IiII lIIII CCL 68 4 ! DIM LS 6~ C 1 CPS G1 68 4 I C~S G2 ~8 4 I C~S MON 68 4 1 C~S 5KS 65 4 1 CPS lOS 68 4 1 C~S MSJ 68 4 1 SU R~OR 68 4 I DIM RiCS 68 ~ 1 DIM ** FORMAT ** CURVE NfiYE SPS SS G E1 .S CSS RATO R!N i--Ii 6~ SIZ~ 4 4 4 4 4 4 4 4 S~PLE 1 1 1 1 1 1 1 1 1 UNITS F/NN CPS CPS C~S SU DIM DIM TYPE I I I I 8 9 ENTRY BLOCKS ENTRY DESCRIPTION I DEP?MS DECD~SE 60.0 FRAME SPACING .lIN FRAME SPACING UNITS · . · : T.=_~M ZNATOR L_EYEL SPACING DATUM SPECIFICATION BLOCKS CURVE REPR NAME CODE SIZE SAMPLE UNITS CCL 68 4 1 LS 63 4 I CPS 01 68 4 1 C~S 02 68 4 I CPS MON 68 4 I CPS BKS 68 4 I CPS ISS 68 4 I CPS MSD 68 4 I SU RBOR 68 4 1 RIGS 68 4 I DiM ** DATA ** DEPTH 10452.000 ;T 31:~5.7760 F1 CCL 0.000 SP2, 13,999 01 6559.344 GE1 S I 08269. 200 MON 56,994 BKL ~9,991 !SS 314478.600 SSMA 21 ,228 RBOR I .886 RIN 1 2 DEPTH 10400.000 FT 316::).9270 M CCL O.O00 SPO 1~.822 S1 8349..785. G=IS 1r'.gA~7~ :_..8:30 MON 52.702 iS2 322800.300 55M~ 17.172 R8OR 1 .91~ RIN 11 . 891 OEPTM 10"400.. .00n~ ;T 31'~9 CCL O.O00 SPO 13,793 01 6394.887 GE1S 111 MON 51 ,229 BKL 93.¢09 ISS 323103,900 SGM~ 19.481 RBOR 1.931 RIN 11 .'745 DEPTH 10~00.000 FT 3108.9060 M COL 0.000 SPD 13.325 01 14118.865 GElS 11~C95.~00 MON 54.489 BKL 65.1C7 ISS 331837.100 SGMA 19.257 RBOR 1.399 RZN 8.571 OEPTH 10100.000 FT 3078.4860 M CCL O.CO0 SPD 1 01 14360.910 GElS 138532.10~' MON 56.961 BKL 11~.3¢5 ISS 359334.500 SG.MA 17.2'b5 RBOR I .515 RIN 8 · 704 DEPTH 10000.000 FT 30~$.0060 ~ CURVE NAME SP2 SS GElS G~ SKL CSS SGM~ R~TO RIN LS 02 HSD ~,I£S LS .~ K S MS'D R!CS LS 02 RICS LS 5KS RICS LS 02 5KS RICS LS 02 R~PR CODE 68 6~ SIZE i III 4 4 4 4 4 1229.$7~ 145Q.853 67Q.932 C.624 18.522 1381.,832 2093.941 178.500 0.24~ 17.582 118~.308 1342.519 209.~26 0.548 18,9~3 4027.25~ 1~!.3Z5 0.257 12.245 3255,546 4688,105 ~3,5.¢01 0,301 12,369 1171.016 515.795 1 1 1 1 1 1 1 1 1 SS CSS R~TO SS G~ SSS RATC SS GR CS,S RATO SS ~R CSS RATC SS GR CSS RATC SS GR UNITS IIIII ~/MN CmS CmS SU 22937.7t0 ~7.437 16¢7~.300 18.854 24421 .~80 17, c',- 12.35';. 95,2 17.671 21 Q?I. .~.3.706 17050.b, 10 18.3,80 44107.370 33.553 27100.850 16.1~6 ~4605.510 53.~52 29051.2S0 13.708 28~48.340 70.612 ISS 3166 .1 0 SGMa . S RBOR I 577 R~ ,. · .N ~- 9C5 DEPTH 9940.500 FT 3029.]71g M COL 0.000 SPD 13 ·999 G1 162~.~37 G=IS_ 28~67.,.~.~0 MON 15.998 BKL Z9.~92 ISS 78182.130 SGMA 3~.736 RBOR I .¢73 RIN 8.~39 MSO RZCS · LS G2 MSO RICS STARTING DEmTH =10452.000 ~T ENDING DEPTH = 9940.500 FT 31~.776C M ~029.871~ M -- $ILE TRAILER ** FIL~ NA~::.,, P~S~ 2.~ SERVICE NA~E: VERSION ~ : 1 OATE: ~5/11/ MAXIMUM LENGTH: ~iL~ TYPE: N~XT.mTLm, . ** FiLE HE~DER ~ 4 ** :ZLE N6ME: P~SS 3.00& SERVICE NAME: VERSION # : ! D~TE: 8S/11/2~ MAX RECORD LENGTh: FILE TYP=: LO PREVIOUS FILE N~E: '~2~ *'~ INFORMATION RECORDS 0.360 17.228 4C9.959 2~9.971 1A9.9~5 1·040 14.95C RATO SS GR CSS RATO 24 775 54.399 5229.480 21.6~9 MNEM CONTENTS APiN : 5gO2920596-OO CN : ~DCO ~L~SK~, WN : DS 17-7 ~N : PRUDHOE B~Y' COUN : NORTH SLOPE STAT : ~LASK~ LCC : I~0.00 FOR,MAT ** ~.NC. UNITS ENTRY BLOCKS TYPE ENTRY mmmI mlmmm ~ 1 B 6C.0 9 .lin 11 12 0 DATUM CURVE NAM~ CESCRIPTION DEPTHS CEC~EaEE FRAME SP&CiN$ ~RSME SP$CING UNITS M~X'MUM~ FRAM=S/RECnRD.. TERMINATOR LEVEL SPACING SPEC!r-ICaTION BLOCKS REP~ CODE SIZE SAMPLE CNITS ,, ,. .. CURV: NAM= CODE SIZE SAMPLE UNITS CCL 68 4 I DIM LS 68 4 1 CPS G1 68 4 1 CPS G2 68 4 1 CPS MON 68 4 1 CPS BKS 68 4 I CPS ISS 6B 4 I CPS MSD 68 4 I SU REOR 6~ 4 I DIM RICS 68 4 I DIM SPD SS GElS GR BKL CSS RATO 68 68 68 F/MN CPS CPS CPS SU DIM DIM FORMAT ** ENTRY BLOCKS TYmE ENTRY OESCRIPTION 4 I O~PT~S_ .. DcrREASE~,~ 8 60.0 FRAME SPACING 9 .lIN F~AME SPACING UNITS 11 12 MAXIMUM ~RAMES/RECORD 0 T~RMINATOR -g.500 &~VEL SPAC!NS DATUM SPECIFICATION ~LOCKS CURVE REPR NaM= CODE SIZE S~MPLE UNITS mmmm mmm-- CCL 68 4 I DIM LS 68 4 1 C~S G1 6~ 4 1 CPS G2 68 4 1 CPS MON 65 4 I CPS ~KS 68. C 1 CPS ISS 68 C 1 CPS MSD 68' ~ 1 SU RBOR 68 4 1 DiM RICS 68 4 I DIM CURVE N~ME S~3 SS G~IS 5KL CSS SGM~ R$TO REmR CODE mm, mm 68 SIZE 4 4 4 4 4 4 SAMPLE 1 1 1 1 1 1 1 1 1 UNITS r/MN C~S CPS · ~ SU ** D~TA ** LS F'.? SC RICS 11~9 8~1 2099.79C C.32L 17 7~5 SS CSS R~TO 22~77.720 23.422 173~ '~. _,:"00 OEPTm 10400.C'0 FT '3169.927C M ii~iiIIll~iII CCL 0 C~ . ~ SFD 14.278 G1 30~0 2?0 GElS 107554 10~ ..... · · m MON &8.251 BKL 46.947 ISS 317798.900 SGMA 16.991 RSOR 1.8~8 RiN 11.735 LS HSD RICS t39~.07C 2543.159 157.48C 0.41C 17.657 SS GR CS~ RATC 23854.780 17996.6E0 17.126 OEPTH CCL 0.000 SPO G1 5497.6~5 GElS MON 53.580 BKL ISS 319939.80C SgM~ 1 0300. 000 FT 31 39. 4460 M 14.302 LS 112361.500 G2 96.297 BKS 20.3~3 MSO 1051.538 1524.119 lg6.505 0.544 · ', SS GR CSS R~TO 2C903.680 44.169 16380.500 lO.712 · . · DEPTH I 0200. 000 FT 31 03. 966,3 COL O.OCO S~O 14.229 G1 14029.450 GElS 113270.4CC~ MON 52 157 ~.KL ~ ISS 325147.400 SGM~ 1~.7~2 REOR 1.3~ R~N ~.~ LS f]KS -~iCS DEPTH 1013C.C..'0 :T 337~.45~_C M CCL :::- .... G1 MON ISS RSOR £ .CZ~ C.215 7.~ · ~. 'S G,_,. E'~S CCL 0.000 SPD 1 G1 42~9.525 GElS 10603 MON 47.023 BXL 15 ISS 306¢25.900 SGMA 3 R~OR 1.536 ~IN LS G 2 D$PTH 9Q25.5C0 FT 3025.2990 M CCL 0.090 S~D 1 61 1149.885 GElS 221~ MON 4.000 5KL 17 ISS 652~3.470 SGM~ 3 RBOR 1.4~8 2.999 LS 7.?EO G2 2.91~. ~ ,N~S~, 8.338 ~ICS STARTING DEPT~ :10/,53.000 .CT ENDING DEPTH : 9925.500 FT 3156.38!0 M 3025.2990 M ~F~2. P'"5 ,ii, C.IZa 12.3~5 1113.174 4~1.162 17.55C 239.97~ 15;.9~4 22;.977 C.SCC 1 6. 042 SS G~ CSS R~TO SS CSS S~ G~ CSS SS Gq CSS mSTO 43161.7~J 35.120 ~47~.c~ 15.9~ ~S:Z5.13,5 5~.53~ 2E3~6,610 14.975 27717,~03 75.130 1 ...'747~ 5~' ,.~. ..' ~.! 69~9.$09 4069.59~ 25.917 10 ** FILE TRAILEq ** FILE N~ME: PASS 3.004 SERVIC~ NAME: VERSION # : 1 D~TE: 85/11/ MAXIMUM LENGTH: 102~ FILE TYPE: LO NEXT FILE NAME: ** TAPE TRAILER ** T~:DE NAME: SERVICE NAME: PASS 3 DATE: ...... ORIGIN OF: D~1TA: FSYS T4PE CONTINUATION ,~ : N,-2XT TAPE N~ME: COMMENTS': 01 ** REE REEL N SERVIC D~TE : ORIGIN REEL C NEXT R COMMEN .D ~1 ~ L TRAILER ** AME: E NAME: BITLZS OF DATA: FSYS ONTZNdATZCN ~ : 31 EEL NA~E: TS: DRESSE~ ATLAS LIS CUSTOMER TA~E --- CRE.&TEB ~Y R 2.C TADE HEAOE~ - FILE HEADE~ - INFORMATION - ~ORMAT - DATA - TABLE DUmP - FILE TRAILER - TAPE TRAILE~ - REEL TRAILER - TOTAL RECORDS: I 1 4 8 350 1 1 37B . '.' .',..... RECEIVED OCT 2 o 1981 ~ Oil & .~as. Cons. Commission Anchorage ~----$CHLUMBERGER----~ ********************** ~I$ TAPE VERIFICATION ~I$~NG LVP 009.H05 VERIFICATION LISTING PAGE ** REEL HEADER ~* SERVICE NAME :SERVIC DATE :Si/lO/ 2 ORIGIN : REEL NAME IREEL ID CONTINUATION ~ fO! PREVIOUS REEL I COMMENTS :REEL COMMENTS ** TAPE HEADER SERVICE NAME :SERVIC DATE :81/10/ 2 ORIGIN :6217 TAPE NAME CONTINUATION # PREVIOUS TAPE COMMENTS :TAPE COMMENTS ********** EOF ********** ** FILE HEADER ** FILE NAME :$ERVIC.O01 SERVICE NAME VERSION # DATE : MAXIMUM LENGTH : 1024 FILE TYPE PREVIOUS FILE ** INFORMATION RECORDS MNEM CONTENTS mmmm mmmmmmmm WN : 17'7 FN : PRUDHOE BAY RANG: RANGE TOWN: TOWNSHIP SECT: SECTION COUN: N. SLOPE STAT: ALASKA CTRY: USA MNEM CONTENTS ~mmm mm~m~m PRES: DIbOO1F RECORD TYPE 047 *~ UNIT TYPE CATE SIZE CODE 000 O0 016 065 000 ~ 0 o6~ o~ oo o00 000 012 065 000 000 005 065 00 000 008 065 O0 000 0O7 O65 000 000 008 065 000 000 006 065 000 000 004 065 mm, mmmmmm ,mm,m, mmmmmmmmmmmm ,mm, mmmmmm 000 000 O07 065 5VP 009.H05 VERIFICATION LISTING RECORD TYPE 047 ** RECORD TYPE 047 *~ *~ COMNENTS ~ JOB # i0707,61671 DIL RUN #1, LUGGED 4-jUN'8! BOTTOM LOG INTERVAL TOP LOG INTERVAL CASING-LOGGER BIT SIZE TYPE HOLE FLUID DENSITY VfSCOSITY PH FLUID LOSS RM ~ ~EAS. TEMP. RMF @ MEAS. TEMP. R~C @ ~EAS. TEMP. RM ~ BHT 10782 FT. 9948 FT. 9948 IN. ~ 9948 FT. 17 IN. LIGNOSULFONATE 10,0 39.0 12,0 1.170 ~ 60.0 F 0.~40 $ 59,0 F ~.420 ~ 60.0 F 0.423 ~ 178 F MATRIX SANDSTONE ************************************************ PAGE LVP 009,H05 YERIFICATZON LISTING PAGE 3 ** DATA FORMAT RECORD ENTRY BLOCKS TYP DATUM SPECIFICATION BLOCKS NNE~ ~ERVICE SERVICE UNIT ID ORDER # DEPT FT SFLU ISN OHMM SP DIL MV GR ISN GAPI DT AVG US/F RHOB ISN G/C3 NPHI ISN PU DRHO ISN G/C3 GR ISN GAPI CALI ISN IN NRAT ISN NCN5 ISN FCNb ISN DEPT SP NPHI NRAT DEPT SP NPHI NRAT DEPT SP NPHI NRAT DEPT SP NPHI NRAT DEPT SP NPMI NRAT 10817 50O SFbU -999:250 GR 39.355 DRHO 3,104 NCNb 10800.000 SFbU -42.719 GR 60 DRHO :1o4 10700,000 SFLU -42 823 GR 24:854 DRHO 2.432 NCNb 106~0,000 SFLU 8.208 GR 27.88i DRHO 2.588 NCNb 10500.000 SFLU -83.938 GR 24.121 DRHO 2.352 NCNb SIZE 4 ! API API LOG TYPE 0 0 0 0 0 0 0 12 7 0 31 0 52 0 35 0 68 0 44 0 31 0 28 0 42 0 34 0 34 REPR CODE 65 ~6 API API FILE CLASS MOD NO. 0 0 0 0 0 0 0 0 0 46 0 0 o o ~2 0 32 0 0 ! 0 0 2 0 0 0 0 0 32 0 0 3 0 0 ! 0 0 92 0 0 93 0 0 -999.250 IbM -999.250 DT 0.321 GR 2544.000 FCNL 62 4'43~ D 101. T 0.263 GR 2544.000 FCNL 7.750 IbM 84.435 DT 0,005 GR 3020.000 FCNL 3 416 ILM 25."297 DT -0.002 GR 3018.000 FCNL 5.289 24.53i DT 0,100 GR 3120.000 FCNL ENTRY _ ,liN 0 SIZE PROCESS LEVEL 4 0 ~ 0 4 0 o 0 4 0 4 0 4 0 -999,250 -999,250 RHOB i01,875 CALI 767.500 5.688 84.750 RHOB  01,875 CALI 67,500 6,973 ILD 75,050 RHOB 99,688 CALI 1181,000 525 85,234 CALI 10 0.000 2,592 ILD 36.212 RHOB 1,344 CALI 1329.000 SAMPLE 1 EPR ODE 68 68 68 8 68 68 68 ~250 613 6.145 7,012 2.641 ,930 8'367 2.271 547 LVP 009.H05 VERIFICATION LISTING PAGE 4 DEPT 10400.000 SFhU SP -83.167 GR NPHI 24.854 DRHO NRAT 2.406 NCNb . 21. O. 3546. 258 641 016 000 IbM DT GR FCNL DEPT 10300,000 SFLU SP '76 .354 GR NPHI 25.195 DRHO NRAT 2.428 NCNL 83o 44 004 000 DT FCNL DEPT 10200.000 SFDU Sp -93.646 GR NPHI 25.488 DRHO NRAT 2.434 NCNb 16. 33. O. 3588. 922 063 017 000 DT GR FCNb DEPT 10100.000 SFLU SP -43.010 GR NPHI 12.158 DRHO NRAT 1.666 NCNb 53~i, 74. 0 500 312 058 000 DT GR FCNL DEPT 10000.000 SFLU SP -38 479 GR NPHZ 36:963 DRHO NRAT 3,381 NCNb , 117. O. 1646. 745 250 152 000 IbM DT FCNL DEPT 9914 000 SFbU SP -43:729 NPHI -999.250 DRHO NRAT -999.250 NCNb :999 27 7s8 250 250 IbM DT GR FCNL ** FILE TRAILER FIDE NAME :SERVIC.O0i SERVICE NAME : VERSION # : DATE : MAXIMUM LENGTH I 1024 FILE TYPE NEXT FILE NAME EOF ** FILE HEADER FIDE NAME ISERVIC.002 SERVICE NAME : VERSION # : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE INFORMATION RECORDS .I46 8 ,938 RHOB t9.547 CALl 1394'000 9~,141 '475 RHOB 28.359 CALI 131i'000 11.820 87,575 RHO~ 33.844 CALI 1388.000 49.531 IbD 66.850 RHOB 84.500 CALI 2122.000 01,484 ILD 11~:1775 RMOB 88 CALX 484.250 2000,000 IL 56,356 RH~B -999.250 CALl -999,250 :906 289 8,594 8.594 20,14I .398 .422 5~,938 .605 9.898 1.452 ,461 1~,102 . 6.594 .-999,250 999.250 LVP 009.H05 VERIFICATION LISTING PAGE 5 MNEM CUNTENTS PRES: FDNOOiF RECORD TYPE 047 ** RECORD TYPE 047 ** RECORD TYPE 047 ** UNIT TYPE 00o C TE 000 007 co .s 065 ** DATA FORMAT ENTRY BLOCKS RECORD DATUM SPECIFICATION MNE~ SERVICE SERVICE ID ORDER # DEPT NPHI NRAT NCNb ISN FCNL GR ISN TYPE 4 8 9 0 BLOCKS UNIT FT GAPI DATA ** DEPT 10004 500 NPHI FCNL 1367:000 GR DEPT 10000,000 NPHI FCNL 1367,000 GR DEPT 9900,000 NPHI FCNL 338.000 GR DEPT 9800,000 NPHI FCNL 305.000 GR DEPT 97~.000 NPHI FCNb 3 ,250 GE DEPT 9600,000 NPHI FCNb 347,750 GE DEPT 9500,000 NPHI FCNL 361,000. GR SIZE REPR CODE 4 73 4 65 ! 66 AP1 AP1 AP1 FILE LOG TYPE CLASS NOD NO. 0 0 0 0 0 0 68 2 0 0 0 o o 0 ~ 0 34 93 0 0 0 31 32 0 0 4 49.~21 NRAT 406, 50 49 414 NRAT 51,367 NRAT 105,750 5 49 023 NRAT 62:094 45 ENTRY ,liN 0 SIZE PROCESS SAMPLE REPR PEVEL CODE 4 0 1 68 4 0 ~ 68 ~8 4.098 NCNb 5984,000 4,098 NCNb 5984,000 4,113 NCNb i459,000 4,219 NCNb i468,000 4,250 NCNb 1414.000 4,090 NCNb 1472.000 3,914 NCNb ~492,000 bVP 009,H05 VERIFICATION LISTING PAGE 6 DEPT 9 FCNb DEPT 9 FCNL DEPT 9 FCNL DEPT 9 FCNb DEPT 9 FCNL DEPT 8 FCNL DEPT 8 FCNL DEPT 8 FCNL DEPT 8 FCN5 DEPT 8 FCNL DEPT 8 FCNb DEPT 8 FCNL DEPT 8 FCNL DEPT 8 FCNL DEPT 8 FCNL DEPT 7 DEPT 7 FCNL DEPT 7 FCNL 400.000 NPHI 4 341,750 GE 9 300.000 NPHI 5 316,250 GR i0 0.000 NPHI 4 ~0.000 100.000 NPH! 4 308.250 GR 5 000.000 NPHI 4 347'000 GR 4 900 000 NPHI 4 397:000 GR 5 800.000 NPHI 4 390,000 GR 4 700,000 NPHI 4 355,250 GR 5 600.000 NPHI 4 438.250 500.000 NPHI 4 300.250 GR 5 400,000 NPHI 4 333.500 GR 4 300,000 NPHI 4 369.000 GR 4 00,000 NPHI 4 ~17.250 GR 7 100.000 NPHI 4 312.000 GR 7 0,000 NPHI 4 ~2'750 GR 5 900.000 NPHI 4 366.250 GR 5 800,000 NPHI 5 334,250 GR 6 700,000 NPH! 4 357,000 GR 4 8.877 0.938 0.684 3.188 8.779 9.063 5 801 4:906 5.508 2,844 2.139 5,219 O~ 5,344 0 088 6.729 0.469 5 68 4.336 9.438 8.779 7.438 7 461 3~375 8. 6.6~1 6,9 8 94 2.285 5.000 NEAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT ~RAT NRAT 4,082 NCNb 4.184 NCNb 4.078 NCNb 3,914 NCNb 3.898 NCNb 3,713 NCNb 3,832 NCNb 4,109 NCNb 3.602 NCNb 3'967 NCNb 3,873 NCNL 3.834 NCNb 4.078 NCNb 4.004 NCNb 3,910 NCNb 3,963 NCNb 4.211 NCNb 3,723 NCNb 1489.000 t517.000 t433.000 1419.000 1422.000 ! 547. O00 1543.000 1487.000 1604.000 t284. 000 1393.000 1534. O00 1397,000 1468. 000 1542.000 1422,000 1397.000 1538. 000 bYP 009.H05 YERIFI CATION DEPT 7600,000 NPHI FCNL 365.500 GR DEPT 7500,000 NPHI FCNL 389,000 GR DEPT 7400.000 NPHi FCNb 441,000 GR D£PT 7300.000 NPHI FCNb 267.000 GE DEPT 7200,000 NPH! FCNL 298.000 GR DEPT 7100.000 NPHI FCNL 290.750 GR DEPT 7000 000 NPHI FCNL 437:750 GR DEPT 6900,000 NPHI FCNb 305,500 GR DEPT 6800.000 NPHI FCNL 441.500 GR DEPT 6700.000 NPHI FCNb 374.250 GR oo ~EP~ 6~00,000 ~PHE DEP? 6300,000 NPH! FCNb 6.875 eR DEPT 6000.000 NPH! FCNL 231.750 GR DEPT 5900,000 NPHI FCNL 411,000 GR bISTING 40,869 48.969 43 652 :soo 6,963 5.406 50,635 52.219 8,730 ~0.594 47.510 44,250 4 041 50.879 41.406 38,574 28,203 44,336 38.469 ,563 0 869 35 596 64.404 53.031 41. 5 68.506 42.219 55,029 47,031 41.797 23.531 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT 3,645 NCNb 3,799 NCNb 3,432 NCNb 4.180 NCNb 4.074 NCNb 4.008 NCNb 3,709 NCNb 4.19! NCNb 3.518 NCNb 3.836 NCNb 3.78i NCNb 3.645 NCNb 3.357 NCNb 4.934 NCNb 4.336 NCNb 5.160 NCNb 4.422 NCNb 3.697 NCNb PAGE 1487.000 1564.000 1189,000 1388,000 I274.000 2613.000 1324.000 2662.000 2370,000 2530.000 1661,000 1527,000 1203,000 1200.000 2~29,000 1244,000 1533,000 I bVP DEPT FCNL DEPT FCNL DEPT FCNL DEPT FCNL DEPT FCNL DEPT FCN5 DEPT FCNL DEPT FCNL DEPT FCNL DEPT FCNL DEPT FCND DEPT FCNL DEPT FCNL DEPT FCNL DEPT FCNb DEPT FCNb DEPT FCNL DEPT FCNL , , 009.H05 VERIFICATION LISTING 5800,000 NPHI 317.750 GR 5700,000 NPHI 291,750 GR 5600,000 NPH1 302,000 GR 5500,000 NPHI 396,000 GR 5400 O0 NPHI 5300.000 NPHI 246,375 GR 5218.000 NPHI 3 ,500 GR 5100,000 NPHI 437.000 GR 5000,000 NPH! 364,750 GR 4900,000 NPHI 370.000 4800 000 NPH! 35725oo 4700.000 NPHI 291,250 GR 4600 000 NPHI 287:000 GR 4soo. Goo 320,250 4400,000 NPHI 241,875 GR 4300.000 NPHi 234.500 GR 4200 000 NPHI 4100.000 NPHI 224,500 GR 46 43 49 48 4 57 45 50 21 41 ~-5 4O 32 47 48 ~5 46 50 47 5O 5 40 4O 56 46 .729 .063 805 '406 '969 .324 .500 59 748 '656 820 :063 ,998 .141 34O '0i6 584 391 :906 .488 .688 ,275 ,563 .182 .656 .836 .938 .348 .969 NRAT NRAT NRAT NRAT NRAT ~RAT NRAT NRAT NRRT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT 3,965 NCNb 4.133 NCNb 3,994 NCNb 3.81! NCNb 4,188 NCNb 4.547 NCNb 4,i76 NCNb 3.69t NCNb 3.643 NCNb 4,035 NCNb 4.055 NCNb 4.066 NCNb 4.164 NCNb 4.172 NCNb 4,543 NCNb 4,758 NCNb 4.520 NCNb 4.492 NCNb PAGE 1323,000 1373.000 1284,000 1567.000 1203.000 131!,000 1502.000 1605.000 1388,000 1603.000 1465,000 1187,OO0 i326,000 1348,000 1217,000 II14,000 1203,000 1072.000 LVP 009.H05 VERIFICATION DEPT 4000.000 NPHI FCNL 248.125 GA DEPT 3900.000 NPHI FCNL 224.250 GR DEPT 380~,000 NPHI FCNL 27 .250 GR DEPT 3700.000 NPHI FCNL 219.750 GR DEPT 3600.000 NPHI FCNL 249.625 GR DEPT 3500.000 NPHI FCNL 231.250 GR DEPT 3400 000 NPHI FCNL 296:500 GR DEPT 3300.000 NPHI FCNL 227.750 GR DEPT 3200.000 NPHI FCN5 221.250 GR DEPT 3100.000 NPHI FCNL 303.000 GR D~ ~ooo oo ~ ~, ~oo.ooo ~ ~ ~oo ooo ~ FCNL 240~250 GR DEPT 2700,000 NPHI FCNL 2 .250 GR ** FILE TRAILER ** FILE NAME ~SERVIC.O02 SERVICE NAME ~ VERSION # : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : NEXT FILE NAME ~ LISTING 58.838 39.594 60 254 51 31 65.604 44.469 56 055 36:500 63,28! 45.469 54.395 36.625 60 596 45:z88 60,840 32.Z88 52 344 26:859 50 879 979 2 44 61.572 40,750 63,574 22,?97 , 56 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT 4,629 NCNb 4.707 NCNb 4.215 NCNb 5.i64 NCNb 4.477 NCNb 4.87i NCNb 4.387 NCNL 4.727 NCNb 4.738 NCNb 4.273 NCNL 4.195 NCNb 4.309 NCNb 4.777 NCNb 4.891 NCNb 4.926 NCNb PAGE 1199,000 1121.000 1126.000 I082. 000 1222,000 1233. 000 t271.000 1i98,000 1157,000 1448. 000 1278.000 1306,000 1184.000 f051.000 li98,000 LVP 009,H05 VERfFICATION LISTING PAGE 10 $$ TAPE TRAILER ~ SERVICE NAME :SERVIC DATE :81/10/ 2 ORIGIN :6217 TAPE NAME : CONTINUATION ~ ~01 NEXT TAPE NAME ~ COMMENTS :TAPE COMMENTS $* REEL TRAILER rS SERVICE NAME :SERVIC DATE :81/10/ 2 ORIGIN : REED NAME :REEL ID CONTINUATION # 50! NEXT REEL NAME : COMMENTS :REEL COMMENTS ZOZOOeOO OeO0 OeO0 OeO0 Oeo0 loloo.5o o.oo o.oo o.oo o.oo 10103,00 201,22 252,76 ~9,30 10103.50 202.~ 252.76 %9.19 93.62 -:' :'=- :='' ''="- "-= :=:= ::::::::::::::::::::::::::::::::::::' ::::::::::::::::::::::::::::::::::::::::::::: :: :::'::./::::::.: :: .:. S:'::: ::'...";;.::::Ei::~::: ~ ':.i:i'::~:i::::?7::.~--:, :: : ': :"': :: :;:::~ ::F::! !:!!!':'!:l.~:::: '.: :' ::::7: 5:~ 0~:~:.05::i~:0:0:;: ~.;:;.;~ ::~2 :~;;::i::05.::: ;;~:;:~:~:.~;:25;~:;:~99:.?:; :.:? :: ;~;8~;:i:::6::fi:~::; i? ::; i?:::~?.'~::::~:;:~:::6:.2;' ~; ;~.:?.~:~ ~:: ;~i;.~;:;.:::::::;::::~::;-:~::::-:~.~: ::.;::~:~ :::: :;: :. :: ~?:'.:: ::~:;: :::::::;: :~:~ :::~ ::::: ::.:~::::::.:?::: .:~:: :c ::: ':::: :~::~' ::; :: ;:::?.~5.:~ ~ ?:;:;: ~.:.:::: ::~:~ :: :;:~:.::;;~; .:.: :::::: :::::::: :::::::::::::: .: ::.;.:?.;:::.:~5;';~.?; ~:.~ ~:::::: :'.:? ;: ::.: ::: ~ ~.: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::: 10106.00 209.15 2%8,%7 %5.~% 96.69 10106.50 210.98 299.08 ~g,60 95.85 10107.00 212,20 2~8.~7 44,23 96~ ~.~.':... ~:,;.:-~1;;: :::: :~]~:.~;::::~:;;~}:~.:'.:~ :~::];:: :::]':;:::??¥~::?{:~::? ~.:~:::?~:':7:~:~::::::~:::~:~:'?';'1':~:::?¥::~:~:??~::?:.:;: :'::; :?:]::~].. ,, :5:~ 10109,00 21~.65 258,28 ~5,~0 9~,11 10109,50 219.51 260.12 ~5.60 9~.11 10112.50 212.Z0 252.15 ~5.00 95.85 :.l:~:~::Wi;~:~;~,~::%~:::;T~:':::2::~:~4::~~:~;:%~::~;:.~:~:.:~:~:~'~ ::;'~6~:~.~:~;;':?';;:?:'i~';~8"?:: 10115.00 20~.88 250.92 ~8.12 92.02 loll5,50 200.61 252,76 ~9,66 9e,~9 · ::,.._ .......... .. I 0i:~6.';50:?: :::::~1;97:.~' ;5~::~: ~ ::. .: :::252: . 15;' :: ::: .: ::::: ;' 5 0::~:~6~::: 10118,00 20~,88 253,~7 ~7,97 10118.50 20~.27 252,76 ~8,05 96,52 10119..50 2.09.1.5 2:50 '~5',26 :".98.'77 10120.00 21~,6~ 2~'8.~7 ~3.13 98,77 ~0~2~.00 2~.02 25~,~9 ~5.~0 1012i.50 e10.98 258.e0 ~7.86 95.21 10122.5.0 2:18'90 273,01 ~7.9~.:': :"98'65 10123.:00 217,.07 278.55: .~9.I9': :' :98,.16 ~:_0 lg.~., 5'0 ~II,59 278.5 ~ ......... ~,2.~ ' 95'..~ 10124.00 210,98 277.91 51,28 95.71 ~o~.so ~.~ ~7~.~ 5o.~5 ~7.o~ ............................................. PAGE 2 ARCO ALASKA INC. 10125,50 228.66 282.21 qq.56 91.78 10126.00 232.32 277.91 q2.80 88.59 , 10128.50 232.93 28q'.05 q$,35 98, oq. 10129.00 2;56.59 278.5;5 q0,67 96.07 ~_...~,:~.~~~~;~ i;~2~~LZ:~.~~:i~;~ ;~:~ ~ ~ ;~'~:::::~::~;::~;::~:;;~:::~::~ ~:::~::::~::~:.::~::::~:~:~;;:::~:::::~::~:~:~:::~:~:::~:~;~`~:~:~::: ~:~::;~;~:~ ~;~'~::~ :~ ::~;::~ ~:~:~;~:~;~:'~:::~::~;: ~:~::::~:~:~::~;~;::~::~::~:~:: ~"::::;~:~:~:~:~:~ :'~:/:':~:~: ;;: :~ ~:~: :: :~' :: ~ :~:: ~ ~ ~:/~:~~~~ ~:~ ~;,~;~:~:.:;~_~L~;~_55&::~ ~.i;;;L:' :~:::: :~: ~:~': ~ ::: ::~::::~:'~::~:~: .;;~:::~:~;~::/:~:::~:.;~;;:<:::.~;~:;:j~.~:~::/~:.~:~:::::~.::~::::~:::~::~/::~ ;:~::~:~;:~' ~;:;:"~ :~:~:/:~:;~::~:~;:;~ ~:/<~:~: ~'~': '~ ~'~ 10131.50 209.i5 269.9~ ~9,70 99,51 )~ :~'~ 10132,00 212.20 266,87 ~7,53 98,65 ~ .... -~~Z~--~?~~-~5 ~ 0 ~~ .... ~ .... "~2 :: :::.: : .... :.: ........... :: :'.: ..:.: ....... ....: :::-::~T:~: ~H:::.': ~:~ :;:~: ~ :::.:~:~::~ :~:~":' :~:~:, ~ : :. ~'~ 1 ~'.' : ;., '~:::~.~':~:::'..:':'::::::~T ":, "'.:~::. ::~' :::::::::::::::::::::::::::::::::: '.::.:::..:..::..'":.:: :.': :::':: :::' ":: :: :.. :"::. ":.:::. :::::::::::::::::::::::: "':~:~:~:~:~::".i::::~.:::' i:~;L::::.:::...:,....,..... ,......_,................ ~.' C:~,:, :::'::~::. '. ::.::: :: .:.:. ::: ::::::::.~: .:: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::.: ::..:' :: :::::.. ~ ~;:.::-:::;: :::: :. :.,:' .::::. ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :.::: ,:: ::::.::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::: ::::. ~ 1013~,50 210,37 263,19 ~7,~6 93,13 "~ F.~~'~2;; ":.':::~'~:;';~ ::'... '::.: :: ..~ :~.:O~;~&~::::~~::.:: ~; :::: ~ ~ ~:~:; ~::~::~'~ ~: ~'~::~ ~ ':~:~:'~:':':g~;~:~:~::~ ~:::'~::~:::::~:~::: ;~; ~:: ~:'~:~:~:'~::~::':~::~ ~::::~::~::~::~:~:::'~:::~ ;~'~::~:~::;~:~::':::~':~:~:::~;~::::'::~::'~::';~:::: ~ ~::'~:::': :~::~:'~;~:::'~::'~;~;~ ~::::::~:~::~':~:~::~::~::::~{~i'::~;~; :'~;~;~::~:::~;::: ~ ::::::~::'~'~::; ~ ~ ::~ ::~::':':: :::::'::~ ~ :: :: ::~ :: :: :: :: :: ::~:::~ ~ ;::::::~ :'::~:~::~:~::~ ~::::~:'~:: :~; ::'::::'~:'::~;:;:~:'~::~::::::~:~:}::~;~ :~;::~::~::~;::~::~ ~:'~: '~::~ ::::~::::;~::~::~::~::~;::~ ::~::~~~:~::;,~~ ?'~ 10137.50 217.68 262.58 ~.23 9~.85 )~{ 10138.00 220.73 257.67 ~2.10 96,69 ~'.~_~:~.~': ' :'"'" : :: '" ':' :+ ' ''~ ' '::"~' ' :': ~'<:~:~'~" "::' ':: ::'::::':: ' '::" :": ::':: ":':' ":"~":~':~ :'::J.~~:.~::'::~:" :: ":':: / :::::::::::::::::::::: '" < ::'? :'::" ':': ....................... '':< "::':':':':":'::~'~':'"::':~':'~:~": ':~ ......................................................................................................................................... :::::::::::::::::::::::::::: :: :'::"< :'"" :::'" :'": '<: ~::" ':':: ::~: :::':::::':': ' '::"': ':' :'::::' :" '::':'' : .x.:.:.:+:.,. ::. :+.:./.:::: :: ::::::::::::::::::::::::::::::::::::: :':':'::::::2':. ::::::'.2::::.":':.: :..:.: .'..: ': .:.'. :'::: :.~.2::: ~.: .:..:: ':::': .:': ::':::' :. ,':::<' :-: · ~, '.:.: · ...: ::: .'.: .' ::"~ :::<'.':::':.~::..::::,.:"~,,".:... :..::~ .: .',~" '...:.. :.. :',+' :":' "':< :'.-~:~; · :-~:.:: ............ : :,. :" ~'~ lOlqO.50 220.73 255.37 ql.59 97,~2 .~ . 101~1,00 215,85 252,76 ~3,53 99,02 :~: 1Q~~ ..... 216,q6 253,_~ q~jg.~_ _.!.0..0..,..57 .... 101q3.50 208,5q 267.q8 50,58 95,95 ) :'~ lOlqq,O0 200.00 269.94 53,70 96,56 ~'~ ~'~0:~.~5. O0 : 200.0:0::: '2'6~1'55 :' :51"02 ~,:92i52 )~' I01~5,50 207,52 '257,06 '~' 101q6.50 212.80 250.31 q3.5~ 97.18 .) ~'~ 101%7,00 21%.63 2~7.2~ ~3,2~ 96,93 '~' 101%8::. O0 226,22 250,51 59-05 ) ~: 101:~,8~50 2;52,95 -2:5:0.31 57,36 9~...62 ~ 101~9.50 2~.29 258,90 ~6.5~ ~2.88 '~i 10151.00 2~e.07 280.~7 ~0.85 85,~0 ) ~'~ 10151,50 259,02 285'28 4.1'70 ~.~ ~152,00 2~2,~2 282,82 ~3,20 88~2 ~ 1015~.00 237,80 275,~6 ~0,78 97.91 )~'~ Z015~,50 233.5ff 276.69 ~1,51 ~01,60 ~ ~.. ~55 ~00 235 ~7 27 ~2 ~.~ 2~ ) "';" 10157,50 209,15 2~9,08 ~5,~0 100,37 ~ 10158,00 206,7~ 2~08 ~1 99~ ~?.r: ~0160,00 217,07 255,21 ~,98 98.~8 ) ~?'~ Z0160,50 219,51 252,15 ~1,29 98,28 ~" 10161,00 21~.63 2~7,85 ~2,~3 100,37 ~L??:'~' :~] :.~ ~'~ :::; :~:~ ~ ~/~,~::~:~::;:~d~ :~:~.?~J~:~:~;~ :~;:~ ~J ?'~;~ 10163.00 184,76 25B.60 58,~B 95.21 )~z~i 10163,50 185,37 258,90 59,50 96.20 ~o~ 1016~.00 193.90 265.03 57,56 9~.85 10166,00 228.66 275.46 42,25 90,45 10166,50 220,75 265.64 42.76 90.31 ) %~': 10'I6:8 "00:. '::::":.':.::~5!;:i~i:5,:: ::?'?.::';'?.:.,~'~ii' 85:":: ' . ..... ' ~'~.~: 10169,00 201,83 2q. 4,17 4.6,69 94,35 )-" 10169,50 196,54 239,88 48,56 98,40 "'~_ .................... !.~_~2._q.,_P~P ...... 19__._7. ,_5_~ ....... _2.3_p_,__2~ .......... ._q._8_.,A~ ........ P__7., 6 7 ':-'~ 10170,50 197,56 242,94 : 49,37 97,9I )" 10171,00 198,78 2L~G,OI 49,59 99,0:2 .... 10172.00 196.95 2~.17 ~9.15 101.23 )'~ 10172,50 196.34 2~2.33 49.11 100.86 '_~::: ................ ~_O_lT_3_._,p.p_ .... _1_8._8__,.4_1_.23~,_88_ ...... 5!.~8_..7 _. 99 '-'.-~: 1017:3,50 185.37 238,0~ 5a'38 )~'~*" 1.0174. O0 184,76: 254,36 52.~6~ 1:0:0 .~_!~ ............ _1_g~!_7__~._,._5_.0 ....... _1=.8_._6_,59 2.~4,9,7_ ....... ~:.!.., q~.3 98:,,0._~_ ~-~ 10175.00 192.07 253.13 4~.78 )~=-~ 1017s.50 200.61 232.~2 ~.11 9s.ua !~_.:. ................... ~_0.._1Z_6_:_09_ ......... .2_._0._0_..~.~ _2__33___. 13 ....... ~..5..,._7__0 ..... _9 .... - ...................................................................................................................... -- : ~ :.. ....... : ...... ::..::..::.::.: .: ..: .:..x.. :.:::::::: :.:...:... :....:.:: .:.:... ..... .: ............ ::... ......... · .... : .. :. ·: ...:.::.: .........:.:.::.:..>: .:..:..:.:... {,~{ 10176.50 198.78 236.81 q, 8.4.5 925.87 ') ~ 10177200 201222 2~6,01 ~9.33 93.37 . , 10182,50 196,3~ 239.26 ~7.53 95,95 ) ~:' 10183.00 195,12 23q.56 ~7,2~ 96.56 ~ ~,,o ;, ::.,:::?::~:, :: .;;~;d:t8,'-,5 O: ::.*:,: i :~;~;~ ~:~:~ ::~*::2~:*~*~::*::;:::::;~*: ~2',~*.::::~;~ ~:~:*/,~8;;2~*d~?/:~:: ),** 10186.00 196.~ 236,20 ~8,16 98.0~ b')5 ~7~:{ ~ '" ': ':..:...: :....: ¥::~: ~:: :~;:~:~:~'' ;~ :~:~;":: ::::::::::::::::::::::::: .... .. · ......... .............. .: ..... .......:....... ~'"'"":':':+:'"': ":'"::':":~ ~ :":": ::::::::::::::::::::::::::::::::::::::::::::: L__~::;~*~?.~}.~;~:..,.. :~.~.~'~~;~~;;~;~*'~;;*'*.. *~?:?'~? "~}~~~,~?,~ 10188,50 206,10 23q,97 %3,~6 101.35 ~0~ · !:~! 10191.50 204'.27 2:36.20 4'4'.4'1 99,59 -)i~'~l 10192.00 198.17 23~.36 ~6,18 101.55 ~, 1019~.~.___ 199,39 231_~ %5,~% 10q.17 '35"' ::: :: ': .:" ::"::' '< 1019~.50 227.q~ 2~9.69 39.27 108,22 ~'~ 10195.00 231.10 253.37 37.51 111.55 '~ 101~96,0:0 2'26.85' 2~:0'~ "'" 10196.50 226.83 : 237, ~2'" 56 .'5:5 i:85,5I: ................ ~01 ~7/..._0~ ........... 2~_~_~_....~ 9. '~ 10197.50 2~2.68 2~7.2~ 36.0~ 121.35 )~:" 10198.00 25~.88 266.26 56,55 120.25 50 2 0 ~9 290 10199.00 5~2.80 ~18.%0 Z0~99.50 ~0.2~ 5%~.01 ):s ARCO ALASKA i.NC, ':'. ::'. ........... P_-.. _S_,. __. _.1_7. ~7..._P...[!:Ug_H__ .0:.~..__ _BA :Y__ N.O_BT_H.: _,<;_ b_O.._ ? ~ ............................................................................................... _; L