Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout181-039Ima.~roject Well History File CoveOge
XHVZE
This page identifies those items that were not scanned during the initial pro'duction scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
L~. L- 0~(~ Well History File Identifier
Organizing
RESCAN
DIGITAL DATA
OVERSIZED (Scannable)
[] Color items:
[3 Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
[] Diskettes, No.
[] Other, No/'rype
BY;
BEVERLY ROBIN VINCENT ~ MARIA WINDY
[] Maps:
~-- Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Project Proofing .,
BY; ~ROBIN VINCENT SHERYL MARIA WINDY
Scanning Preparation
BY: BEVERLY ROBIN
Production Scanning
Stage 1
VINCENT SHERY~WINDY
BY:
Stage 2
BY~
(scANNING IS COMPLETE AT THiS POINT UNLE~ SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE 1'O QUAUTY, GRAY$CAt. E OR COLOR IMAGES)
PAGE COUNT FROM.SCANNED FILE:
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: YES '~ NO
BEVERLY~VINOENT SHERYL MARIA WINDY DATE;/'--/
IF NO IN STAGE t, PAGE(S) DISCREPANCIES WERE FOUND: YES NO
Ill Illllllllll II Ill
ReScanned (individual page [.~pecial a~et~tiotq.~ca~mlng completed)
RESCANNED BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE:
IS~
General Notes or Comments about this file:
Quality Checked
12/10102Rev3NOTScanned.wpd
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
No. of Completions
1a. Well Status: 0 Oil 0 Gas 0 Plugged 181 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
DIL / GR / SP, GR / SP / DIL / BHCS, GR / FDC / CNL / CAL, HDT, CBL / CCL / GR / VDL, Gyro, USIT
CASING, LINER AND CEMENTING RECORD
SEÏTINß'D~~<~D ,SETllN<?DEflTH'fVp, HQI.E;,> '"" . " ," ,,', ,
, Top', BQT1fOM ,:,ToÞ ,BorrOM 'SIZE';, "1 Cr;MENJINß RgÇORP ,
Surface 110' Surface 110' 36" 8 cu yds Concrete
30' 2699' 30' 2699' 17-1/2" 2627 cu ft Arcticset II
29' 9458' 29' 8465' 12-1/4" 1292 cu ft Class 'G', 130 cu ft AS I
8960' 10265' 8058' 9079' 8-1/2" 438 cu ft Class F'
0 GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1743' SNL, 883' WEL, SEC. 06, T11N, R14E, UM
Top of Productive Horizon:
4385' SNL, 1326' EWL, SEC. 05, T11N, R14E, UM
Total Depth:
4829' SNL, 1478' EWL, SEC. 05, T11 N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 664103 y- 5975313 Zone- ASP4
TPI: x- 666379 y- 5972720 Zone- ASP4
Total Depth: x- 666542 y- 5972280 Zone- ASP4
18. Directional Survey 0 Yes 181 No
22.
CASING
SIZE
20" X 30"
13-3/8"
9-5/8"
Wt. P~RFf: .
Insulated
72#
47#
26#
GRADE,
Conductor
L-80
L-80
L-80
7"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
. '1 If.'..U 'E""~"Ìj
St;¡~~'!! ~~."'. ,.,
8 2.nO~i
26.
Date First Production:
Not on Production
Date of Test Hours Tested
27.
TuéÎNGRECORD
SIZE DEPTH SET (MD)
5-1/2", 17#, L-80 8870' - 8921'
4-1/2", 12.6#, L-80 8921' - 9052'
ACID; FRACTURE,CEMENT SQUEEZE, ETC.
Zero Other
5. Date Comp., Susp., or Aband.
9/28/2004
6. Date Spudded
11/27/1981
7. Date T. D. Reached
12/13/1981
8. KB Elevation (ft):
60.5'
9. Plug Back\Depth (MD+ TVD)
10219 + 9045
10. Total Depth (MD+TVD)
10265 + 9079
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
24.
, ~
1b. Well Class:
181 Development 0 Exploratory
0 Stratigraphic 0 Service
12. Permit to Drill Number
181.;039 304-358
13. API Number
50- 029-20576-00-00
14. Well Name and Number:
PBU E-20
15. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL 028304
17. Land Use Permit:
TVD
25.
DEPTH INTERVAL (MD)
9500'
8810'
8791'
20. Thickness of Permafrost
1900' (Approx.)
AMQLI~T
, PUI-LED
PACKER SET (MD)
8890'
AMOUNT & KIND OF MATERIAL USED
P&A w/ 30 Bbls Class 'G', Sqz to 1000 psi
Set EZSV
Set Whipstock
RBDMS BFL NOV 1 6 2004 0 RIG I N A L
GAs-McF
W A TER-B8l
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
PRODUCTION FOR 01l-B8l
TEST PERIOD -+
Flow Tubing Casing Pressure CALCULATED...... 01l-B8l
Press. 24-HoUR RATE""'"
GAs-McF
W A TER-B8l
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach sePé3rate s~~e:!.jf necessary).
Submit core chips; if none, state "none". ~. \¡F;. ~s
None
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
NOV 1 2004
Gf
28.
)
29.
)
FORMATION TESTS
GEOLOGIC MARKERS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
9464'
8470'
None
Shublik
9495'
8494'
Ivishak
9544'
8533'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~<2/IAiQ. ~ Title Technical Assistant Date ll-ll-Olf
PBU E-20 181-039 304-358 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. Drilling Engineer: Thomas Schaefer, 564-4685
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None". SCANNED NOV 1. S 2004
Form 10-407 Revised 12/2003
Submit Original Only
)
)
Well:
Field:
API:
Permit:
E-20A
Prudhoe Bay Unit
50-029-20576-01-00
204-189
Accept:
Spud:
Release:
Rig:
09/29/04
10/08/04
10/16/04
Nabors 2ES
PRE-RIG WORK
09/25/04
RIH WI 41/2" X EQUAL PRONG NO CHANGE IN PRESSURE. LATCH STA # 2 @ 8595' SLM, OJ HITS UP TO
1200# S FOR A HOUR, TAP DOWN FOR A HOUR.
09/26/04
RU .125 WIRE AND EXTRA SECTION LUB. RUN 3.5" BELL GUIDE WI 2 1/2" JDC LOCATE AND SD 8572'
SLM, POOH, RECOVER GO-DEVIL. RUN 3.5" BELL GUIDE W/ 21/2" JDC LOCATE AND SD ON FISH @ 8563'
SLM JAR 45 MIN PULL FISH WITH DGLV #2. RUN 4.5" GR SD @ 8980' SLM, LOCATE PLUG, ATTEMPT TO
PULL, SHEAR PIN POOH. PULL 4.5" XXN PLUG. RUN 3.615" CENT TEL WI SAMPLE BAILER. LOCATE
TTAIL @ 9018' SLM, 22' CORR. TAG @ 10114' SLM, BAILER WAS EMPTY.
09/27/04
RIH WITH 2.5" BDN. FLUID PACK IA WITH 1% KCL AND TOP WITH DIESEL. LOAD AND KILL WELL WITH 1%
KCL AND TOP WITH DIESEL. SAT DOWN WITH 2.5" NOZZLE IN OPEN POCKET OF GLM #2. POOH. MU
AND RIH WITH 3.0" BDN.
09/28/04
RIH WITH 3.0" BDN. LOAD & KILL WELL W/ 1% KCL, DIESEL CAP. LAY 30 BBLS 15.7# CLASS G CEMENT
FROM 10,125'. BUMP WHP UP TO 500 PSIG, HOLD FOR 30 MIN. WORK WHP UP TO 1000 PSIG, HOLD FOR
30 MINUTES. EST. 6 BBLS BEHIND PIPE. ESTIMATED CEMENT TOP @ 9500'. CLEAN OUT W/ 44 BBLS
BIOZAN FROM 8830' TO 9200' CTMD AND CHASE TO SURFACE @ 80% WI XS 1% KCL. ALLOW IA TO U-
TUBE DIESEL INTO TUBING. LEFT WELL SHUT-IN. RDMO. NOTIFIED PAD OPERATOR OF CONDITION.
JOB COMPLETE.
SCANNED NO\! 1. 8 200~,
)
)
BP EXPLORATION
Operations SummélryReport
Page 1 .,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-20
E-20
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 9/27/2004
Rig Release: 10/16/2004
Rig Number:
Spud Date: 11/27/1981
End: 10/16/2004
Date From-To Phase Description of Operations
--------
9/27/2004 00:00 - 07:00 7.00 MOB P PRE Cleaned pits and prepared for moving. Bridled up and secured
service loops. Staged out camp, shops and pit module to
OS-15 access road. Laid down derrick. Moved camp shops and
pit module to E-pad. Staged rig module to OS-15 access rod.
07:00 - 10:00 3.00 MOB P PRE Wait on escort. Cleaned area around OS 15-26B
10:00 - 00:00 14.00 MOB P PRE Moved rig module to E-pad. Rig on pad at 23:50 hours.
9/28/2004 00:00 - 00:00 24.00 MOB N WAIT PRE Standby with rig while pre-decompletion work was completed.
Cleaned and organized rig. Performed general maintenance.
Bringing location to grade for rig placement.
9/29/2004 00:00 - 04:00 4.00 MOB N WAIT PRE Standby with rig. Raised area in front of well 6" to 8" for rig pad.
Cleaned and organized rig and performed general maintenance
while standing by.
04:00 - 05:30 1.50 MOB P PRE Laid down heculite and mats. Set wellhead equipment behind
cellar.
05:30 - 08:30 3.00 MOB P PRE Moved camp, pit module and sub to location.
08:30 - 12:00 3.50 MOB P PRE Moved and spotted rig module over E-20. Laid down heculite
and matts for pit module. Set in pit module. Spotted and
hooked up camp. Built berm for cuttings tank.
12:00 - 15:30 3.50 MOB P PRE Held PJSM. Raised and pinned derrick. Unbridled. Rigged up
floor and cellar. Spotted shop. Completed pre-spud checklist.
15:30 - 16:00 0.50 WHSUR P DECOMP Rig accepted at 15:30 hours. Held PSJM.
16:00 - 16:30 0.50 WHSUR DECOMP Installed secondary annular valve.
16:30 - 17:30 1.00 WHSUR P DECOMP Rigged up OSM lubricator. Pulled BPV.
17:30 - 18:00 0.50 KILL P DECOMP Rigged up circulating lines.
18:00 - 20:30 2.50 KILL P DECOMP Circulated out diesel freeze protect with clean seawater at 3
BPM with 100 psi. Well dead. Rigged down circulating lines.
20:30 - 21 :00 0.50 BOPSUR P DECOMP Installed TWC and tested from below with 1000 psi.
21 :00 - 00:00 3.00 BOPSUP P DECOMP Nippled down tree and adaptor flange. Installed double studded
adaptor and BOPS.
9/30/2004 00:00 - 03:00 3.00 BOPSUF P DECOMP Filled BOP stack with water. Made up 5 1/2" test joint. Tested
upper pipe rams, blind rams, manifold & valves, TIW valve,
inside BOP & top drive to 250 psi low and 3500 psi high.
Tested annular to 250 psi low and 2500 psi high. Rigged down
test joint. BOP test witness waived by Chuck Scheve -
AOGCC.
03:00 - 04:30 1.50 BOPSUP P DECOMP Rigged up lubricator. Pulled TWC. Rigged down lubricator.
Cleared floor.
04:30 - 06:00 1.50 PULL P DECOMP Held PJSM. Rigged up Schlumberger to run string shot and
chemical cutter.
06:00 - 08:00 2.00 PULL P DECOMP Ran in hole with string shot to 9052'. Shot interval from 8859' to
8871' to prepare for chemical cut. Pulled string shot. Made up
chemical cutter.
08:00 - 10:30 2.50 PULL P DECOMP Ran in hole with 4 7/16" chemical cutter and cut 5 1/2" tubing at
8870' ELM. Pulled chemical cutter. Rigged down
Schlumberger.
10:30 - 13:00 2.50 PULL P DECOMP Made up landing joint and screwed into tubing hanger. Drained
stack and backed out lock down screws. Pulled tubing hanger
to floor. PU - 185,000 Ibs. String weight - 175,000 Ibs. Laid
down tubing hanger and landing joint.
13:00 - 14:00 1.00 PULL P OECOMP Rigged up 5 1/2" running equipment and spooling unit for
control line.
14:00 - 16:30 2.50 PULL P DECOMP Laid down 5112" 17# 1-80 IBT-M tubing and spooled control line
to control valve. Retrieved +/-2060' of stainless steel tubing, 26
Printed: 10/18/2004 9:55:35 AM
SCANNEr) NO\! 1 8 2004
)
)
Page 2"
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-20
E-20
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Date From - To Hours Task Code NPT Phase
----- ---- - ---~._---
9/30/2004 14:00 - 16:30 2.50 PULL P DECOMP
16:30 - 00:00 7.50 PULL P DECaMP
10/1/2004 00:00 - 01 :00 1.00 BOPSUF P DECOMP
01 :00 - 01 :30
01 :30 - 04:30
0.50 EV AL P
3.00 EV AL P
DECOMP
DECOMP
04:30 - 05:30 1.00 EVAL P DECOMP
05:30 - 10:00 4.50 EV AL P DECOMP
10:00 - 16:30 6.50 EV AL P DECaMP
16:30 - 17:30 1.00 EVAL P DECOMP
17:30 - 20:00 2.50 STWHIP P WEXIT
20:00 - 21 :00 1.00 STWHIP P WEXIT
21 :00 - 00:00 3.00 STWHIP P WEXIT
10/2/2004 00:00 - 01 :00 1.00 STWHIP P WEXIT
01 :00 - 08:00 7.00 STWHIP P WEXIT
08:00 - 08:30 0.50 STWHIP P WEXIT
08:30 - 09:30 1.00 STWHIP P WEXIT
09:30 - 12:00 2.50 STWHIP P WEXIT
12:00 - 12:30 0.50 STWHIP N RREP WEXIT
12:30 - 17:30 5.00 STWHIP P WEXIT
17:30 - 18:30 1.00 STWHIP P WEXIT
18:30 - 19:00 0.50 STWHIP P WEXIT
19:00 - 20:00 1.00 STWHIP P WEXIT
20:00 - 21:00 1.00 STWHIP P WEXIT
21:00 - 00:00 3.00 STWHIP P WEXIT
SCANNE[! NO\ll 8 2004
Start: 9/27/2004
Rig Release: 10/16/2004
Rig Number:
Spud Date: 11/27/1981
End: 10/16/2004
Description of Operations
-----.--------
~.-- - - "---._-
clamps and 3 stainless steel bands.
Completed pulling out of hole with 5 1/2" 17# L-80 IBT-M
tubing. Recovered a total of 211 joints, 20.22' cut joint, 12
GLM, control valve and XA nipple.
Made up 4" test joint and set test plug. Tested upper and lower
variable bore rams, dart valve and TIW to 250 psi low and 3500
psi high. Tested annular to 250 psi low and 2500 psi high.
Rigged down test joint. Ran and set wear bushing.
Held PJSM. Rigged up Schlumberger.
Ran in hole with junk basket and 81/2" gauge ring. Tool initially
stopped at +1- 8770'. Worked down to 8850'. WLM. (+1- 20'
above tubing stub. Ran correlation strip for US IT tool. Pulled
junk basket. Recovered pieces of possible banding material
and cement. Correlation log showed Junk basket on top of
tubing stub.
Changed out wireline heads and tools. Tested US IT tool on
surface.
Ran in hole with US IT tool to 8865'. Logged from 8825' to
surface.
Made up gyro tool and ran in hole. Ran gyro survey from 8850'
to surface.
Held PSJM. Made up 9 5/8" EZSV.
Ran and set 9 5/8" EZSV at 8810'. (4' above casing collar).
Cleared floor. Tested 9 5/8" casing to 3500 psi for 30 minutes.
Test was good with no seepage in cellar.
Made up 9 5/8" whipstock with starter mill, 8" lower string mill
and 8 1/2" upper string mill. Picked up MWD. Scribed MWD
and uploaded. Made up UBHO, 9-DCS &1 HWDP. Surface
tested MWD.
Picked up 21 joints of 5" HWDP.
Run in hole with whipstock assembly, picking up 4" DP to
8791'.
Orient whipstock to 86 deg LHS. Tagged EZSV at 8791' DPM.
Set anchor with 25K down. Shear lug with 40K down. TOW-
8767'.
Pump high-viscosity pill and displaced the well over to 10.6 ppg
LSND drilling fluid.
Milled window from 8767' to 8772'.
Top drive locked up - overheating. Trouble shoot top drive.
Milled window from 8772 to 8783 and 12' of new hole to 8795'.
PU - 225k Ibs, SO - 160k Ibs, RT - 185k Ibs, off btm torque -
11,000, on btm torque - 15,000 at 80 RPM. Circulated at 500
GPM @ 2150 psi. TOW - 8767' and BOW - 8783'.
Pumped sweep. Reamed and back reamed thru window.
Worked pipe thru window wlo rotating - window is clean.
Circulated bottoms up.
Ran FIT to equivalent of 12.0 ppg MW with 10.6 ppg mud and
575 psi. Monitor well- okay.
Blew down surface equipment. Laid down 2 singles. Serviced
rig and top drive. Inspected oil lube filters. Found large metal
shavings in filters which appeared to be from bearings..
Slipped and cut 100' of drilling line.
Pulled out of hole laying down 4" DP.
Printed: 10/18/2004 9:55:35 AM
')
)
BP EXPLORATION
Operations Summary Report
Page 3 ..
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-20
E-20
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 9/27/2004
Rig Release: 10/16/2004
Rig Number:
Spud Date: 11/27/1981
End: 10/16/2004
Date From - To Hours Phase Description of Operations
-- -- -. -- - --._---- --
1 0/3/2004 00:00 - 03:00 3.00 STWHIP P WEXIT Continued to pull out of hole. Laid down 4" DP and stood back
HWDP.
03:00 - 04:00 1.00 STWHIP P WEXIT Laid down DCS and bumper sub
04:00 - 04:30 0.50 STWHIP P WEXIT Down loaded MWD and laid down.
04:30 - 05:00 0.50 STWHIP P WEXIT Broke out and laid down milling assembly. Upper mill was full
gauge.
05:00 - 06:00 1.00 STWHIP P WEXIT Pulled wear bushing. Flushed out metal shavings from inside
BOP stack. Re-ran wear bushing.
06:00 - 07:30 1.50 STWHIP N RREP WEXIT Ran in hole with HWDP. Made up RTTS and set at 50'. Tested
RTTS w/1 000 psi - okay. Laid down running tool.
07:30 - 11 :00 3.50 STWHIP N RREP WEXIT Rigged down floor. Removed Bails and elevators. Broke saver
sub, IBOP and swivel packing connections.
11 :00 - 12:00 1.00 STWHIP N RREP WEXIT Bridled up.
12:00 - 15:00 3.00 STWHIP N RREP WEXIT Drained lube oil from top drive. Removed kelly hose, electric
service loop and block links. Lowered pipe chute.
15:00 - 16:00 1.00 STWHIP N RREP WEXIT Held PJSM. Laid down derrick. Secured blocks and drilling line.
16:00 - 17:30 1.50 STWHIP N RREP WEXIT Held PJSM with crane crew. Removed top drive and secured to
transport trailer.
17:30 - 19:30 2.00 STWHIP N RREP WEXIT Raised derrick & pipe chute. Bridled down Hung off blocks.
19:30 - 00:00 4.50 STWHIP N RREP WEXIT Removed draw works guards, brake band equalizing bar, pin
and bushing for inspection. Prepared cellar for paint and
performed general housekeeping.
10/4/2004 00:00 - 00:00 24.00 STWHIP N RREP WEXIT Re-installed brake band equalizer bar. Tore down top drive and
found the main thrust bearing had failed. Washed out metal
shavings and cleaned parts. New parts for top drive have
arrived in Deadhorse. Performed general housekeeping,
painting and maintenance while overhauling top drive.
10/5/2004 00:00 - 00:00 24.00 STWHIP N RREP WEXIT Performed general housekeeping, painting and maintenance
while overhauling top drive. Top drive cleaned and
reassembled. Chip found in main gear. Continue topdrive
overhaul while order new bull gear.
10/6/2004 00:00 - 00:00 24.00 STWHIP N RREP WEXIT Perform general maintenance, welding and painting on rig.
Installed main drive gear on top drive and continued overhaul.
1 on /2004 00:00 - 08:00 8.00 STWHIP N RREP WEXIT Performed general housekeeping, painting and maintenance
while overhauling top drive. Top drive reassembled. Finished
top drive overhaul and off rig checks. Laid down derrick.
08:00 - 09:30 1.50 STWHIP N RREP WEXIT Spotted crane. Picked up and set in top drive.
09:30 - 11 :00 1.50 STWHIP N RREP WEXIT Raised derrick and hung block links.
11 :00 - 12:00 1.00 STWHIP N RREP WEXIT Bridled down.
12:00 - 17:30 5.50 STWHIP N RREP WEXIT Made up kelly hose. Reconnected service loops. Tied back
bridle lines. Filled gear case. Installed blower hose and bales.
Welded bracket on top drive.
17:30 - 21 :00 3.50 STWHIP N RREP WEXIT Energized top drive and test functioned. Adjusted clamps on
link tilt. Reassembled grabber foot. Torqued up saver sub
connections and clamps. Tightened wash pipe unions.
21 :00 - 22:00 1.00 STWHIP N RREP WEXIT Circulated through top drive and rotated at 80 RPM for 15
minutes, 100 RPM for 15 minutes and at 156 maximum RPM
for 10 minutes. Pressure tested wash pipe packing to 3500 psi.
22:00 - 23:30 1.50 STWHIP N RREP WEXIT Held PJSM. Made up RTTS retrieving tool and TIW valve.
Engaged packer at 50', checked for pressure and released
packer. Broke out and laid down packer. Hole was full.
23:30 - 00:00 0.50 STWHIP N RREP WEXIT Pulled out of hole with HWDP.
10/8/2004 00:00 - 01 :00 1.00 DRILL P INn Made up Directional BHA #2 with bit, motor and MWD.
SCANNE.[) NO\! 1 8 ¿UU4 Printed: 10/18/2004 9:55:35 AM
)
)
Page 4 ..
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-20
E-20
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Date From -To HoUrs
--_..u_-.-_.-_._..--- -.,------.--------.--
10/8/2004 00:00 - 01 :00 1.00 DRILL P INT1
01 :00 - 03:00 2.00 DRILL P INT1
03:00 - 08:30 5.50 DRILL P INT1
08:30 - 09:30 1.00 DRILL N RREP INT1
09:30 - 11 :00 1.50 DRILL P INT1
11 :00 - 11 :30 0.50 DRILL N RREP INT1
11 :30 - 12:00 0.50 DRILL P INT1
12:00 - 00:00 12.00 DRILL P INT1
10/9/2004 00:00 - 04:30 4.50 DRILL P INT1
04:30 - 05:30 1.00 DRILL P INT1
05:30 - 06:30 1.00 DRILL P INT1
06:30 - 07:30 1.00 DRILL P INT1
07:30 - 08:00 0.50 DRILL P INT1
08:00 - 09:00 1.00 DRILL P INT1
09:00 - 10:00 1.00 DRILL P INT1
10:00 - 10:30 0.50 DRILL P INTi
10:30 - 11 :00 0.50 DRILL P INT1
11 :00 - 12:30 1.50 DRILL P INTi
12:30 - 16:30 4.00 DRILL P INT1
16:30 - 18:00 1.50 DRILL P INT1
18:00 - 19:30 1.50 DRILL P INTi
19:30 - 20:30 1.00 CASE P
20:30 - 22:00 1.50 CASE P
22:00 - 22:30 0.50 CASE LNR1
22:30 - 00:00 1.50 CASE LNR1
10/10/2004 00:00 - 03:30 3.50 CASE LNR1
03:30 - 04:00 0.50 CASE LNR1
04:00 - 04:30 0.50 CAS LNR1
04:30 - 05:00 0.50 C LNR1
05:00 - 05:30 0.50 ASE LNR1
05:30 - 06:30 P LNR1
:'::;CANN[[~ NOV t 8 200lJ
Start: 9/27/2004
Rig Release: 10/16/2004
Rig Number:
Spud Date: 11/27/1981
End: 10/16/2004
Description of Ope tat iOns .
Oriented and uploaded MWD.
Picked up jars and ran in hole with HWDP. Tested MWD.
Ran in hole, picking up 4" DP to 8646'. Filled pipe and broke
circulation every 3000'. Stood back DP from 8646' to 7710'.
Checked out top drive. Lube oil pump not maintaining correct
oil pressure.
Picked up 4" DP from 7710' to 8739'. Broke circulation and
oriented tools to 80 degrees left.
Changed out lube oil pump on top drive.
Worked thru window from 8767' to 8783'. Reamed from 8783'
to 8795'. PU - 215k Ibs. SO 150 k Ibs. Had 2500 psi oft bottom
and 2750 psi on bottom at 516 GPM.
Directionally drilled and slide from 8795 to 9218 (8305 I VD).
Dropping angle and turning left.
Directionally drilled 8 1/2" hole from 9218 to 9393.
Circulate bottoms up for samples.
Directionally drilled 8 1/2" hole to 9425'.
Circulate bottoms up for samples.
Pulled out of hole from 9425' to 8767'.
Completed MAD Pass from 8767 to 85
to 350 FPH.
Slipped and cut drilling line.
Serviced rig and top drive.
Ran in hole from 8567' to 25'. No problems.
Pumped high viscosit weep at 540 GPM and 2950 psi. Flow
checked well. Spo ö liner-running pill on bottom.
Pulled out of h to window. Flow checked well. Pumped dry
job. Contin pulling out of hole to HWDP.
Laid do HWDP, jars and DCS.
Flus ä out MWD and downloaded. Laid down MWD, motor
a bit. Cleared floor.
eld PJSM. Rigged up to run 7" liner.
Made up 7" 26# float equipment. Checked floats. Picked up 19
joints of 7" 26# L-80 BTC-M and L TC-M liner. Made up 7" X 9
5/8" HMC liner hanger and ZXP Liner top packer w/ running
tool.
Ran in one stand of DP and circulated liner volume.
Ran in hole with 7" liner on 4" DP, filling pipe every 10 stands.
Run in hole with 7" liner to 8767.
Circulated liner and DP volume.
Run in hole from 8767' to 9401'.
Made up cementing head, manifold and lines.
Tagged bottom at 9425'. Staged pump up to 7 BPM w/1400
psi. Circulated bottoms up.
Rigged up Schlumberger. Pumped 5 BBLS of water. Pressure
tested lines to 4500 psi. Flushed water from lines. Pumped 25
BBLS of 11.6 ppg Mud Push II Spacer followed by 38 BBLS
(183 sxs) of 15.8 class G cement with .4% 0167, .3% 065, .2%
046 and .03% B155. Washed cement from lines and dropped
dart. Displaced cement with 10.6 ppg mud using Dowell. Latch
plug at 81.6 BBLS and bumped plug at 113 BBLS with 4000 psi
and set hanger. Bled oft pressure. Floats held. Set down 45K
Ibs and rotated to release tool. Pressured up to 1000 psi and
Printed: 10/18/2004 9:55:35 AM
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
ffl.. '~ DS15-13A
I <il.... E-20
~~I{-O Þ1, 8-33A
l£);; ..{~SI-05
<L2_32
M1'" L2-32
¡ '!r 1 L2-32
L2-32
2i:JJ ...(E-400
IrA W-400
-400
Job#
10913854
10866600
10861918
10830793
10687661
10672377
10912982
10687650
40009731
10621738
10621779
¡ ør-039
10/21/04
NO. 3238
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Robin Deason
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
~
Log Description
Color
Date Blueline Prints CD
10/04/08 1
10/01/04 1
06/21/04 1 1
04/25/04 1 1
01/02/04 1 1
04/28/04 1 1
09/06/04 1 1
09/22/03 1 1
10/21-26/03 2 1
10/28/03 6 1
05/05/04
SCMT
USIT
MCNL
RST-SIGMA
RST-SIGMA
RST-SIGMA
RST -SIGMA
RST-SIGMA
OH EDIT MWD DATA
OH EDIT AIT/BHC/PEXl6 ARM CALIPER
USIT
~'
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
/7z¡b1
SCANNED DEC 2 82004
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage, AK 99503-2838
ATTN: Be~ ~ /r
Receive~¡~
[Fwd: Re: E-20A A'pplication for Sundry Approval]
Subject: [Fwd: Re: E-20A Application for Sundry Approval]
From: John Norman <john - norman@admin.state.ak.us>
Date: Fri, 01 Oct 2004 11 :22:06 -0800
-------- Original Message --------
Subject:Re: E-20A Application for Sundry Approval
Date:Fri, 01 Oct 2004 11 :21 :38 -0800
From:John Norman <John Nonnan(â!admin.state.ak.us>
Organization:State of Alaska
To:Winton Aubert <winton aubert(â!admin.state.ak.us>
References :<02AB 14 FCB5BF8B488FE8A28E993 62A 13011 ODABD(â!bp 1 ancex002. bp l.ad. bp.com>
<4154A 194.8030 1 (â!admin.state.ak.us>
Winton be sure a hard copy of this gets into the file--best way is to cc: Jodyand she will insure file is
up-to-date. Thanks,
John
Winton Aubert wrote:
Thomas,
This confirms AOGCC's verbal approval to corrmence sidetrack preparations on \/\.ell PBU
E-20 (PTD 181-039), as detailed in the attachrrents. This Form 10-403 approval is valid
through Step 9. of "Rig Operations", during \Ahich the BOPE test frequency is seven days.
An approved Form 10-401 is required br sidetrack well E-20A. Please submit required
documentation as soon as possible.
Winton Aubert
AOGCC
793-1231
Schaefer, Thomas J (CONTRACT PROFESSIONALS) wrote:
Winton,
As I mentioned on the phone, the well preceding the E-20A is experiencing dif ficulties that might make
it impossible to move onto it by Monday. For that reason we are trying to get E-20A ready in case the
problem s are not resolved. To that end I am attaching the supporting docum ents for the E-20A so
that you might review them and verbally endorse E-20 abandonm ent for this weekend. I will also fax
the schematics in case you cannot open the Canvas files. Thank you for your cooperation.
Regards,
Thomas Schaefer
Alaska Drilling & Wells
907 564-4685 Office
907564-4040 Fax
907 748-2883 Cell
10f2
SCANNED OCT 0 9 2004
10/1/2004 1:26 PM
[Fwd: Re: E-20A Application for Sundry Approval]
20f2
ì I I <;<E-20 Pre-rig ZIP» «E-20 Two-string Proposed.ZIP» «E-20ZIP» «E-20A Sundry
: I I Application.ZIP»
John K. Norman <John Norman(â!admin.state.us>
Commissioner
Alaska Oil & Gas Conserv ation Commission
SCANNED OCT 0 9 2004
10/1/2004 1:26 PM
,,--.,
~
~1r~1rŒ (ID~ ~~~~æ~
AI1ASIiA OIL AlQ) GAS
CONSERVATION COMMISSION
/
I
f
/
,
ì
ffiA~~M~KOWS~GO~RNOO
333 W. ]fH AVENUE. SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279.1433
FAX (907) 276-7542
Bill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
1 YJi-D31
Re:
Prudhoe Bay E-20
Sundry Number: 304-358
Dear Mr. Isaacson:
Enclosed is the approved Application for Sundry Approval relating to the above-
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this decision,
or such further time as the Commission grants for good cause shown, a person
affected by it may file with the Commission an application for rehearing. A
request for rehearing is considered timely if it is received by 4:30 PM on the 23rd
day following the date of this letter, or the next working day if the 23rd day falls
on a holiday or weekend. A person may not appeal a Commission decision to
Superior Court unless rehearing has been requested.
BY ORDER OF THE COMMISSION
DATED this Hday of September, 2004
Enc!.
'#'J'4{4;: "It. ((£.';>°1
~
~
RECEIVED
SEP 2 4 2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280 Alaska Oil & Gas Cons. Commission
.
1. Type of Request:
II Abandon 0 Repair Well II Plug Perforations 0 Stimulate 0 Other
0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
2. Operator Name: 4. Current VYell Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. !HI Development D Exploratory 181-039 /
3. Address: D Stratigraphic D Service 6. API Number: /
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20576-00-00
7. KB Elevation (ft): 60.5' 9. Well Name and Number:
PBU E-20 /'
8. Property Designation: 10. Field / Pool(s):
ADL 028304 Prudhoe Bay Field / Prudhoe Bay Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
10265 9079 10219 9045 None None
Casino I ANoIth SiZe MD TVD Borst COllapse
Structural
- 110' 20" x 30" 110' 110'
SurfacA 2699' 13-3/8" 2699' 2699' 5380 2670
.. 9458' 9-5/8" 9458' 8465' 6870 4760
P
liner 1305' 7. 8960' - 10265' 8058' - 9079' 7240 5410
Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: T Tubing MD (ft):
10027' - 10135' 8902' - 8983' 5-112',17# x 4-1/2',12,6# L-80 9052
Packers and SSSV Type: 9-5/8. Baker SAB Packer; Packers and SSSV MD (ft): 8890'
5-1/2. Otis SSSV Landing Nipple 2064'
12. Attachments: 13. Well Class after proposed work:
!HI Description Summary of Proposal D BOP Sketch D Exploratory !HI Development D Service
D Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work: /
Commencing Operations: October 1, 2004 J DOil DGas D Plugged !HI Abandoned
16. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Thomas Schaefer, 564-4685
Printed Name Bill Isaacson Title Senior Drilling Engineer
Prepared By Name/Numbe~
Sianature Phone 564-5521 Date Terrie Hubble, 564-4628
, COmmisSion u.. OnlY.
""
I Sundry Number: .30tj-3)f?
Conditions of approval: Notify Commission so that a representative may witness
D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance
Other:Te~~ ßorE {o ~ÇOD }?~:; 1e~t Gv~6LLévl~ ¡ 'J çf!"¡ev"- clt4z( cLui/t't1 CV¡)j JW ¡j e C/4
ÅP tll'ú I/t J ¡:t; v V"'- 1(/ . 40 t yJ¿:Ú LV(' r-e J ~ ý ~ ¿ ip h¿:--f k /ÞVÎl{ E ~ 'lv 4- .
Su"'OQ""'" F~' . /; - 4 0 '7 ' fII)MS BF L SEP 2 7 7004 9iÞ1í/)tf
Approved By. -I .} V ~ APPROVED BY
COMMISSIONER THE COMMISSION Date
Form 1 0-403 Revis~6/2 ~ '-- Stj5mit In t>uplicate
)F(J .
v
ORIGINAL
~
~
p
G~/N~æ
To:
Winton Aubert - AOGCC
Date:
September 22, 2004
From:
Thomas Schaefer - BPXA GPB Rotary Drilling
Subject:
Reference:
E-20 Application for Sundry Approval - P&A for Sidetrack Operations
API # 50-029-20576-00
Approval is requested for the proposed P&A of PBU well E-20. In October 1999 E-28A, a new sidetrack,
was put on production. E-20 is twinned with E-28A. E-28A is a full time well that produces into the Low
Pressure (LP) line. E-20 produces into the High Pressure (HP) line. Because of this incompatibility, and
the fact that E-28A is a much better well, E-20 cannot compete. Anyon-time E-20 had during 2000 and
2001 is due to the fact that it temporarily supplied PBGL to E-27A. E-20 has been shut-in since April 2001
to allow E-28A to produce without competition.
E-20 has produced -14.49 million barrels of oil, 70.956 bcf gas, and negligible water. E-20 is a
conventional, vertical well that is currently shut in due to high GOR, tubing/lA communication, and inability
to compete with its twin (E-28A). E-20 has had a GSO squeeze that was successful, however because of
where the GOC is picked (just 5' above the top set of perforations) and the absence of any shale barriers,
a second cement squeeze would most likely be unsuccessful at shutting off the gas and lowering the
GOR. Because of this, there are no viable remediation options available to this well. Since it is shut in, E-
20 adds minimal to zero value to field production. This new sidetrack would give opportunity to increase
additional recovery potential within Zone 1 B/2A of the E-Pad area. To preserve future coiled tubing
opportunities the well will be completed by cementing and perforating a 4%".
The sidetrack is currently scheduled for Nabors rig 2ES, beginning around November 1 st, 2004, after the
completion of the J-23A sidetrack and summer maintenance. The pre-rig work for this sidetrack will begin
at the Well's Group earliest convenience after sundry approval.
Current Condition:
./ E-20 has been shut in since April 2001 to allow E-28A to produce without competition.
./ Failed MITIA 4/15/01. LOL run indicated hole in tubing near surface.
./ Left XXN plug w/ fill extension in XN nipple at 8970' 4/24/01. Plug did not pass pressure test.
./ Confirmed badly corroded tubing with Kinley caliper log 5/13/01.
./ Passed PPPOT-IC to 3000 psi and tubing to 5000 psi on 8/16/04
./ Tubing head LOS: 2 are frozen in out position. Will not move with 1200 ft-Ibs.
./ CMIT TXIA performed to 2,500psi, o.k. Failed MITOA. 9/4/04
Scope
Pre-Ria Work:
1. Function all tubing hanger and 9 5/8" casing pack-off lock down screws and verify free movement.
Completely back out and check each lock down screw for breakage; check one at a time.
2. R/U slick-line. Dummy off any live GLM.
3. Pull the tubing plug from the XN nipple at 8970'.
4. Fluid pack the tubing and the tubing X 9 5/8" annulus as necessary for abandonment plug.
5. R/U coil tubing. RIH and P&A the 7" liner and open perforations with at least -k4bbls (10% excess) of
15.8ppg class 'G' slurry. Leave cement top at 9,800'md. ~ vJ6k-
6. Pressure test against the cement plug to 3,500psi.
7. R/U slick-line. Drift the 5 %" tubing and tag TOC. Confirm sufficient clearance for the 5 %" tubing
chemical cutter (4 7/16" 0.0.) to the planned cut depth of -8,875'.
E-20A Application for Sundry
~
~
8. R/U E-line. RIH wI a 4 7/16" chemical cutter. Cut the 5 W' tubing -8,875' or in the center of the first
joint above the packer.
9. Displace the well to clean seawater by circulating down the tubing through the tubing cut until clean
seawater returns to surface. Freeze protect to -2,100' MD with diesel.
10. Bleed casing and annulus pressures to zero.
11. Set a BPV and test to 1000 psi from tubing annulus. Secure the well. Level the pad as necessary.
RiCl Operations:
1. MI I RU Nabors rig 2ES.
2. Circulate out diesel freeze protection and displace the well to seawater. Set BPVfTWC.
3. Nipple down tree. Nipple up and test BOPE to 3,500psi. Pull BPVfTWC.
4. Pull 5-1/2" tubing from above pre-rig cut at -8,875'.
5. RIH wI 8 W' gauge ring I junk basket with gamma ray/CCL to top of tubing stub. Log casing from
tubing stub to surface shoe at 2699'
6. Run USIT from tubing stub to surface.
7. MU 9 5/8", 47# bridge plug on e-line with CCL. RIH and set as required to allow for an 8800'
whipstock KOP, (set as needed to avoid cutting a casing collar). POOH. RD e-line.
8. Pressure-test the 9 5/8" casing to 3,500psi for 30 minutes. Record test.. . (
9. Perform to 'ob on conductor x 13 3/8" annulus. T~ I;, 10 ,- 4o?; Ovf;J &J yo 1/ ~ ,
10. P/U and RIH with 9 5/8"" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as
desired, and set on bridge plug. Shear off of whip stock.
11. Displace the well to 10.6 ppg LSND based milling fluid. Completely displace the well prior to beginning
milling operations.
12. Mill window in 9 5/8" casing at :!: 8,800' MD, plus approximately 20' beyond middle of window.
Circulate well bore clean.
13. Pull up into 9 5/8" casing and conduct an FIT to 12.0 ppg EMW. POOH.
14. M/U 8 W' Dir/GR/Res assembly. RIH, kick off and drill the 81/2" intermediate section to the top of the
Sag River, per directional proposal. Circulate well clean, short trip to window. POOH.
15. Run and cement a 7",26.0#, L-80 intermediate drilling liner.
16. Test the 9 5/8" casing X 7" liner to 3,500psi for 30 minutes. Record the test.
17. Run and cement a 7" tieback from drilling liner to surface.
18. ND BOP, cut casing, set slips and packoff.
19. Install new tubing spool and NU and test BOPs.
20. M/U 6 1/8" Dir/GR/Neu/Den/ABI assembly. RIH to the landing collar.
21. Drill out the 7" liner float equipment and cement to the shoe.
22. Displace the well to 8.4 ppg Flo-Pro drilling fluid.
23. Drill out the 7" shoe plus drill -20' new formation; pull up into the shoe and conduct an FIT to 10.0ppg
EMW. Drill ahead to TD as directed by wellsite geologist.
24. Circulate, short trip, spot liner running pill, POOH.
25. Run and cement a 4 W', 12.6#, L-80 solid production liner. POOH UD all drill pipe.
26. R/U and run 41/2",12.6#, 13Cr-80 completion tubing. Land the tubing and RILDS.
27. Set a TWC and test to 1000 psi
28. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi.
29. Reverse circulate inhibited seawater to the packer depth. Set packer and individually test the tubing
and annulus to 3,500psi 30 minutes. Record each test.
30. Shear the DCK valve and freeze protect the well to -2,100'. Secure the well.
31. Rig down and move off.
Post-RiCl Work:
1. Pick perfs from LWD log. RIH with 2 7/8" perf guns and perforate:!: 30'-40'.
2. Install well house and instrumentation
3. MI I RU slick-line. Pull the ball and rod I RHC plug from landing nipple below the production packer.
Install gas lift valves.
4. POP well to test unit until cleaned up.
Estimated Pre-rig Start Date:
Estimated Spud Date:
10101/04
11/01/04
Thomas Schaefer
Operations Drilling Engineer
564-4685
E-20A Application for Sundry
TREE ¡=
6" erN
~
E-20
WELLHEAD = FMC
ACTUATOR = OTIS
KB. ELEV = 60.54'
BF. ELEV = 32.01'
KOP= 3000'
Max Angle = 42 @ 10100'
Datum MD = 9971'
DatumlVD= 8800' SS
13-3/8" CSG, 72#, L-80, 0 = 12.347"
2699'
Minimum ID = 3.725" @ 900S'
4-1/2" OTIS XN NIPPLE
5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" 1
8890'
I TOP OF 4-1/2" TBG I
8923'
I TOP OF 7" LNR 1
4-1/2" TBG, 12.6#, L-80, .01522 bpf, 0 = 3.958" H
9-5/8" CSG, 47#, L-80, ID = 8.681" 1
9052'
PERFORATION SUMMARY
REF LOG: SWS BHCS ON 12/12/81
ANGLE AT TOP PERF: 42 @ 9930'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DATE
2-5/8" 8 9930-9940 S 06/28/88
2-5/8" 8 9954-9996 S 06/28/88
2-5/8" 8 10011-10027 S 06/28/88
2-5/8" 4 10027-10046 0 07/14/88
2-5/8" 8 10046-10060 S 06/28/88
2-5/8" 4 10060-10114 0 07/14/88
2-5/8" 4 10125-10135 0 07/14/88
I PBTDI
10262'
10219'
I 7" LNR. 26#, L-80, 0.0383 bpf, ID = 6.276" 1
.
I I
I SAF~NOTES:
8966' -14-1/2 OTIS X NIP, 0=3,813" 1
9008' -14-1/2" OTIS XN NIP, ID = 3.725" I
H4-1/2" BAKER TBG TAIL I
9051'
9040' H ELMD TT LOGGED 07/14/88 I
9911' -1MARKERJOINT 1
2064'
ST tI.I) lVD
12 3006 2955
11 5150 4794
10 6302 5746
9 6453 5873
8 7076 6392
7 7227 6518
6 7616 6848
5 7754 6966
4 8152 7312
3 8307 7445
2 8612 7708
1 8760 7835
8826'
8890'
8921'
DATE REVBY COMMENTS DATE REVBY COMMENTS
12/17181 ORIGINAL COMPLETION
01/24/01 SIS-QAA CONVERTED TO CANV AS
02/27/01 SIS-LG FINAL
10/04/01 RNITP CORRECTIONS
-15-1/2" OTIS SSSV LAND NIP, 0 = 4.562" I
GAS LFT MANDRELS
DEV lYPE VLV LATCH
10 OTIS RA
35 OTIS RA
33 OTIS RA
33 OTIS RA
34 OTIS RA
34 OTIS RA
31 OTIS RA
31 OTIS RA
31 OTIS RA
31 OTIS RA
30 OTIS RA
31 OTIS RA
PORT DATE
-15-1/2" OTIS XA SLDING SLY, ID = 4.562" I
-1 BAKER SABR PACKER W/ SBR, 10=3.813"1
-15-1/2" X 4-1/2" XO I
PRUDHOE BAY UNIT
WELL: &20
PERMrrNo: 181-0390
API No: 50-029-20576-00
SEC6, T11N, R14E
BP Exploration (Alaska)
, TREE =
6" erw
~
WELLHEAD = FMC
ACTUATOR = OTIS
KB. ELEV = 60.5'
BF. ELEV = 28.5'
KOP= 3000'
Max Angle = 42 @ 10,100'
Datum MD = 9971'
Datum TVD = 8800' SS
1::-20 Pre-rig
.
Minimum ID = 3.725" @ 9008'
4112" OTIS X NIPPLE
113-318" CSG, 72#, L-80, 10= 12.347" I
2699'
H
8,875' 1
I Pre-rig chem cut 51/2" tubing
I TOP OF 7" Lt\R I
14-1/2" TBG, 12.6.#, 13-CR. .0152 bpf, ID = 3.958"1
9052'
9-518" CSG, 47#, L-80, ID = 8.681" I
~
.' ¡j'
I Pre-rig cement P&A plug 9800'
. II
ft
'Ii ~
..
ft'
...
..
,
."
11\ II
.
I PBTD H 10219' I
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" H 10262' I
I :~NOTES:
2064'
--i5-1/2" OTIS SSSV LAND NIP, ID = 4.562" I
GAS LIFT MANDRa.S
DEV TYPE VLV LATCH PORT DATE
10 OTIS RA
35 OTIS RA
33 OTIS RA
33 OTIS RA
34 OTIS RA
34 OTIS RA
31 OTIS RA
31 OTIS RA
31 OTIS RA
31 OTIS RA
30 OTIS RA
31 OTIS RA
ST MD TVD
12 3006 2955
11 51504794
10 6302 5746
9 6453 5673
6 7076 6392
7 7227 6518
6 7616 6848
5 7754 6966
4 8152 7312
3 8307 7445
2 8612 7708
1 8760 7835
--i5-1/2" OTIS XA SLIDING SLV, ID = 4.562" I
H BAKER SABR PACKER WI SBR, Ð=3.813" I
--i5-1/2" X 4-1/2" XO I
8890'
8921'
"4-1/2 OTIS X NIP, ID = 3.813"'
H4-1/2" OTIS XN NIP, ID = 3.725" I
9008'
H4-1/2" BAKER TBG TAL 1
9051'
H EL MHTLCX3GED 7/14/88
H M6.MR JOINT
I
I
9040'
9911'
FffiFCRA. TICJ'. SlMv'ARr'
REF LOO: &NS BI-CS ()\. 12/12/81
AfG..EA T TOP ÆRF: 42 @ 9930'
f\bte: ~er to A'oduction œ for historical perf data
SIZE SR= INTffiV AL Q:>nISqz OA.lE
2518" 8 9930-9940 Sqz 06128188
2518" 8 9954-9996 Sqz 06128188
2518" 8 10011-10027 Sqz 06128188
2518" 4 10027-10046 QJn 07/14/88
2518" 8 1 0046-1 0060 Sqz 06128/88
2518" 4 10060-10114 QJn 07/14/88
2518" 4 1012~10135 QJn 07/14/88
OA.TE Æ:V BY CDvMNTS OA.TE Æ:V BY CDvMNTS
12/17/81 œlGNA.L CD\REl"'IGJ
01/24/01 CDNERTID TO CAtfJ AS
02127/01 SlS-LG FML
02127/01 SlS-LG c:æREC1lONS
08127/04 TJS A'e-rig wark for Sidetrack
FRDŒ BA Y LNT
IJIAìL: 6-20
~ f\b: XXX-XXXX
AA f\b: 50-029-20576-00
SEC6, T11N, R14E
8P exploration (Alaska)
TREE""
6" GrN
WELLHEAD = FMC
ACTUATOR = OTIS
KB. ELEV - 60.5'
BF, ELEV = 28,5'
KOP= 8800'
Max Angle - 31.5 @ 8820'
Datum MD = 10134'
Datum TVD - 9192'
13-3/8" CSG, 72#, L-80, D = 12.347"
TOG
/'
E-2tJA Proposed
I SA~!NOTES:
-14-1/2" X NIP, ID = 3,813"
PORT DA TE
ST MD
4 3414
3 6184
2 7964
1 9295
H -4,400' 1
Minimum ID = 3.725" @
4-1/2" OTIS XN NIPPLE
41/2" 12.6# 13Cr80 BTC-M (3.958" ID)
17" 26# L-80 Tieback Liner (6,276" ID) 1-1
8640'
17" 26# L-80 Drilling Liner (6.276" ID) H
TOP OF 7" LNR
9-5/8" CSG, 47#, L-80, ID = 8.681" I
I Pre-rig cement P&A plug
8640'
I 8800' H 9 5/8" Window I
19,182' H41/2"XNipple(3.813"ID) I
I 9,197' 1-17" x 41/2" Baker 5-3 Packer 1
1 9,217' H4 1/2" X Nipple (3.813" ID) I
1 9,232' H4 1/2" XN Nipple (3.725" ID) I
I 9,242' H4 1/2" WLEG 1
I 9242' 1-14 1/2" Hanger I liner top packer I
I 9392' H7" 26# L-80 (6.276" ID) 0.383 bpf I
8959'
9458'
H
I--~. III
.
tIÞ
9800'
..
II
~) .'~
..
lit'
110
.0
IPBTD l-l 10,052' 1
141/2" 12.6# (3,958" ID) 0.0152 bpf H 10,134' I
~ . ...
I PBTD H 10219' I
7" LNR, 26#, L-80, .0383 bpf, ID= 6,276" -1 10262' ~
DATE REVBY COMMENTS DATE REVBY COMMENTS
12117181 ORIGINAL COMPLETION
01/24/01 CONVERTED TO CANVAS
02/27/01 SIS-LG FINAL
02/27/01 SIS-LG CORRECTIONS
08/27/04 TJS Proposed Rig Sidetrack
09/09/04 TJS Tieback Revision
PRUDHOE BA Y UNrr
WELL: E-20A
ÆRMrr No: XXX-XXXX
API No: 50-029-20576-00
SEC6, T11N, R14E
BP Exploration (Alaska)
LARRY GRANT
Attn ·
ALASKA OIL + GAS CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 19 September 1994
RE: Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
E-02 (34-06-11-14)
# DESCRIPTION
1 CN/GR FINAL BL
1 CN/GR FINAL RF SEPIA
1 CCL/PATCH FINAL BL
1 CCL/PATCH RF SEPIA
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
1470.01
5938.02
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage
Received by
Please sign and. ~u~n ~O.:
Petroteehnteal Da~a
BP Exploration (Alaska) Ino
900 Eas~ Benson Boulevard
Anchorage, Alaska 99908
Received by
Date
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 29 September 1994
RE: Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL ~~~-~ DESCRIPTION
E-20 (24-05-11-14) 1 CN/GR LDWG TAPE+LIST
c-°. {~0-~i-~- 9 ,~ ~/~ ~.~w~ ~..~.s~
%~-25 (42-14-11-13) i CN/GR LDW~ TAPE+LIST
ECC No.
Run # 1 1470.01
Run # 1 4811.01
Run # 1 6221.01
Run # 1 6262.00
Run # 1 6269.00
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
D. Paul
Received
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 05/25/93
T9 84580
BPX/PBU~OGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
A-04'~'0~~ PFC 05/13/93 #1
B-07~'O~
C-29~~CNLPRODUCTION LOG' 05/11/93 05/12/93 #1%1
C-42~5/'~ STATIC 05/12/93 #1
E-07~O-~PROD-F 05/12/93 #1
' PRODUCTION LOG 05/12/93 #1
E-20~ PROD-F 05/13/93 #1
F-1i~"'~O~-'~' PROD-F 05/10/93 %1
F-16~[q~ CNL 05/11/93 %1
F-l~[--%~ PFC 05/10/93 ~1
F-429~%%~ PRODUCTION LOG 05/09/93 ~1
F-46~-I~ PDK-100
H-i?~-~0 PROD-F
M-21~-3~ TUBING CUTTER
P-04~l-3~ PFC
R-30~,.-~ P~C
S-07A~,9~SPINNER/TEMP
X-26~O INJ/TEMP
05/08/93 #1
05/09/93 #1
05/19/93 #1
05/11/93 #1
05/18/93 #1
05/16/93 #1
05/14/93 #1
05/20/93 #1
10500.00-10893.00 ATLAS 5 "
11540.00-11785.00 ATLAS 5 "
11000.00-11811.00 ATLAS 5 "
8750.00- 9852.00 ATLAS 5 "
9050.00- 9400.00 ATLAS 5 "
11000.00-11350.00 ATLAS 5 "
9700.00-10140.00 ATLAS 5 "
9200.00- 9500.00 ATLAS 5 "
8830.00- 9564.00 ATLAS 5 "
10380.00-11165.00 ATLAS 5 "
2158.00-11300.00 ATLAS 5 "
9000.00- 9383.00 ATLAS 5 "
10260.00-10720.00 ATLAS 5 "
8400.00- 8474.00 ATLAS 5 "
9100.00-11110.00 ATLAS 5 "
11400.00-11750.00 ATLAS 5 "
11130.00-11400.00 ATLAS 5 "
0.00-10916.00 ATLAS 2/5"
9100.00- 9680.00 ATLAS 5 "
Information Control
Well Records
TO:
THRU:
MEMORAi OUM S tate of Alaska
ALASKA OIL AN~'GAS CONSERVATION COMMISSION
/
Lonnle C. Sml~~ DATE: July 11, 1990 -
Commissioner /~
FILE NO: JT.BF.711.1
TELEPHONE NO:
SUBJECT:
RIG/BOPE Inspection
BPX PBU E20
Prudhoe Oil Pool
FROM:
Sot, t,y ~). ~o~'~
Petroleum
Sunday July 8~ 1990: I made a walk through inspection of the BOPE on
D-0y0n worko~e-~'~Rig-16 on BPX's E20 and found all equipment installed
properly and appeared to be in good working order.
I also checked the BOPE test report of 7/7/90 and no failures were
indicated.
02-001A (Rev. 6/89) .~.
20/11/MEMO1.PM3
Standard Alaska j,
Production C~ml~
900 East Benson Bou~ .~rd
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
November 14, 1988
Alaska 0il & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well E-20 (24-05-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of performing a cement squeeze and
reperforation of the well.
JAB:JAM
Enclosures (4)
Yours very truly,
Manager Production Engineering
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
E-20 Well File .
RECEIVED
NOV 1 6 !~88
Alaska Oil A G~s Cons. Commission
Anchoraga
A unit of the original Standard Od Company
Founded in Cleveland Ohio in 1870.
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Stimulate Plugging
Pull tubing Alter casing
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
Repair well
5. Type of Well:
Development
Exploratory
Sffafigraphic
Set, ce
Perforate
Other X
6. Datum elevation (DF or KB)
KBE = 60.54 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
4. Location of well at surface
1743' SNL, 883' WEL, SEC. 06, T11N, R14E, UPM
At top of productive interval
895'NSL, 1337' EWL, SEC. 05, T11N, R14E, UPM
At effective depth
525'NSL, 1466'EWL, SEC. 05, T11N, R14E, UPM
At total depth
451' NSL, 1491' EWL, SEC. 05, T11N, R14E, UPM
12. Present well condition summary
Total depth:
Effective depth:
8. Well number
E-20 (24-05-11-14) PBU
9. Permit number/approval number
81-39 / 8-468
10. APl number
50- 029-20576
11. Field/Pool
Prudhoe Oil Pool
measured 10265 feet
true vertical BKB 9079feet
measured 10148feet
true vertical BKB 8992feet
Plugs (measured)
Junk (measured)
fill at 10148' (07/88)
Casing Length
Structural --
Conductor 110
Surface 2670
Intermediate 9429
Production --
Liner 1305
Perforation depth: measured
Size
20x30
13 3/8
9 5/8
7
Cemented
8 c.y.
2627 c.f.
1422 c.f.
438c. f.
10027'- 10046', 10065'- 10114',
10125'-10135'
Measured depth
139
2699
9458
true vertical subsea
8830'-8922' (three intervals)
Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8890' with 4 1/2" tailpipe to 9052'
True vertical depth
BKB
139
2699
8464
8057-9079
Sqzd: 9930'-9940', 9954'-9996',
10011'-10027', 10046'-10060'
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary see attachment
14.
Intervals treated (measured)
9 5/8" Baker SAD packer at 8890'; 5 1/2" SSSV at 2064'
LEIVED
Treatment description including volumes used and final pressure
Representative Daily Averaae Production or Iniection Data
-
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
t OV ! 6 1 88
Alasl-~a 0ii & (~s C0n~. Commi~sio~
Anchorage
Tubing Pressure
Prior to well operation 740 2417 14 0 1345
Subsequent to operation
2260 1726 15 0 219
Daily Report of Well Ope~tions X J Oil X Gas Suspended Service
17. I hereby ,~~~t~e'/~ng~rue and correct to the be, st of my knowledge.
Signed ~/~__~'~/'-_-_-_-_-_~.. ~¢-1... ..~ Title Mana~Ter Production En~Tineerin~7 Date//,/., .~/dc~o
Form 10-404 Rev 06/15/88 / SUBMIT IN,I~F~ICATE
WELL E-20 (24-0~-11-14~ PI]ILl
CTU CEMENT SOUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations was performed as detailed
below:
6/27/88
Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi.
Performed mud acid perforation wash and sump cleanout.
6/28/88
Performed a cement squeeze on existing perforations. Contaminated
cement; WOC. Reversed out after 24 hours and tested squeeze.
7/14/88
Perforated the f411owing intervals using Schlumberger 3 3/8"
carrier guns at 6 spf:
10027' - 10046' MD BKB (reperf)
10060' - 10065' MD BKB (reperf)
10065' - 10076' MD BKB (add'l)
10076' - 10100' MD BKB (reperf)
10100' - 10114' MD BKB (add'l)
10125' - 10135' MD BKB (add'l)
Returned well to production and tested.
jm
11/3/88
RECEIVED
NOV 1 6 i888
Al~sk~ Oii& Gas Cons. Comlll|ssio. ll
Anchora!]e,
Slanda,d Alad~a
900 Fast Sanson 8ouleva,d
P.O. 8o= 196612
Anchorage. AID,ko 995 ! 9-66
(907) .~64-S I I I
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
TO: MOBIL
REFERENCE:
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
SAPC CASED HOLE FINAL LOGS
INDEXED
b-'rANDARD
ALASKA PRODUCTION
Date: 07/20/88
TI: 79113
· o.
The following material Is being submll~ed herewith. Please acknowledge receipt by
slgnlnga copy of this letter and returning It to thls office:
·
g-08
R-20
H-23
K-09
Prodiction Log 07/16/88 #1 9900-10130 Sch 5"
Completion Record 07/14/88 #1 8800-10114 Sch 5"
Completion Record 07/15/88 #1 8995-10130 Sch 5"
CET 07/13/88 ~1 9050-9914 Sch 5"
Race i ved
Date
~10I the o~;g;~ol S~o~do,d O~1 Compo.y
F~ed in C~vdo~. ~. ~ 1870.
Standard Alaska (
Production Company%
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
June 8, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well E-20 (24-05-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perform a cement squeeze and reperforation of the
well.
Yours very truly,
JAB:JAM~
Enclosures (9)
cc: J. L. Haas (MB12-1)
E-20 Well File
nager Production Engineering
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA[ t"
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon r'l Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perlorate [] Other
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
¢. Location of well at surface
1743' SNL, 883' WEL, SEC. 06, T11N, R14E, UPM
At top of productive interval
895'NSL, 1337'EWL, SEC. 05, T11N, R14E, UPM
At effective depth
525'NSL, 1466' EWL, SEC. 05, T11N, R14E, UPM
At total depth
451'NSL 1491' EWL, SEC. 05, T11N, R14E, UPM
1. Present well condition summary
Total depth: measured 10265 feet
true vertical BKB 9079 feet
Effective depth: measured 10148 feet
true vertical BKB 8992 feet
Casing Length Size
Structural --
Conductor 110 20x30
S u rface 2670 13 3/8
I nte rmediate 9429 9 5/8
Production
Liner
Perforation depth:
5. Datum elevation (DF or KB)
KBE = 60.54 AMSL feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
E-20 (24-05-11-14) PBU
8. Permit number
81-39
9. APl number
5 0 - 029-20576
10. Pool
Prudhoe Oil Pool
Plugs (measured)
Junk (measured) fill at 10148' (08/87)
Cemented Measured depth True Vertical depth
BKB
8 c.y. 139 139
2627 c.f. 2699 2699
1422 c.f. 9468 8464
..
1305 7 438 c.f. 8960-10265
measured 9930'-9940', 9954'-9996', 10011'-10065', 10076'-10100'
true vertical subsea
8769'-8895' (four intervals)
Tubing (size, grade and measured depth)
5 1/2" L-80 to 8890' with 4 1/2" tailpipe to 9052'
Packers and SSSV (type and measured depth)
8057-9079
9 ~/8" B~er SAB pa~er at 8890'; ~ 1/2" SSSV at 2064'
12. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch []
3. Estimated date for commencing operation
June~July 1988
:14. If proposal was verbally approved
Name of approver
Subsequen~ Work Beported on
Vorm No." Dated
Date approved
15. I herebYr~ce~tify that the foregoing is true and correct to the best of my knowledge
Signed ~.j_~ ,~,..~_~,.~ / . ~~, Title Manaf~erProduction En~lineerin~l
Commission Use Only
Conditioh~ of approval Notify commission so representative may witness IApproval
[] Plug integrity [] BOP Test [] Location clearance
I
Approved by
ORIGINAL SIGNED BY
-~pproved Copy
by order of
No.
LONNIE C. SMITH
Returnedx.) vO
- ~,ommi~sioner
the commission
Form 10-403 Rev 12-1-85
Submit in triplicate
Workover Procedure
Well E-20
1. Perform pre-workover surveillance.
2. RU slickline unit and determine current TD. If insufficient
sump depth is present, perform a gelled water fill cleanout
while flowing the well.
3. Install plug with shear disk in tailpipe nipple. Perform
perforation surge to clear possible plugged perforations.
4. Rig up CTU and support equipment.
5. Perform perforation mud acid wash, flow well.
6. Fluid pack the well and cement squeeze all perforations.
7. Contaminate cement. WOC.
8. Clean out contaminated cement. Pressure test squeeze.
9. Perforate:
10,027-10,046' MD (19') reperforate
(Zone 2A)
10,060-10,065' MD (05') reperforate (Zone lB)
10,065-10,076' MD (11') add perforations (Zone lB)
10,076-10,100' MD (24') rePerfora~e (Zone lB)
10,100-10,114' MD (14') add perforations (Zone lB)
10,125-10,135' MD (10') add perforations (Zone lB)
(S3')
Reference BHCS 12-12-81.
10. Return the well to production. Perform CTU nitrogen lift if
necessary. '
11. In the unlikely event that the well fails to return to
production, perform a stimulation treatment utilizing a CTU
inflatable packer set in the 15' blank interval between
9,996-10,011' MD.
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Off'
Blind Rams
Cutter Rams
2' Chicksan (Kill Line)
Slips
PiPe Rams
Pump-In Sub
(Circula te/R e turns)
Well Head
Swab Valve
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
- CHEVRON
3111 '*C" STREET
ANCHORAGE. ALASKA
TELEPHONE {go7! 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
EXXON
zo: SFO/UNIT/STATE:
(-Marathon)
GETTY
MOBIL -
pHILLIPS
: STATE -
BPAE (Transmittal Only) __
CENTRAL FILES (CC#'s - Transmittal Only),,
Date: 12/8/82
Trans.#: 2913
CC#: 55913
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of, this letter and returning it to this office:--
B-13" Pressure Survey & BHPD Otis 10/12/82
E-10~ " " " " GO 10/28/82
E-18-' ...... " "~ " "'~" CAMCO 10/27-29/82
E-2'0f " " " " GO 10/12/82
G-17~ " " Otis 11/9/82
R-2-" " " CAMCO 10/22/82
R-17j " "' Otis 11/7/82
R-19f " " GO 11/18/82
82)
RECEIVED
DATE
- '.. ,.: EIV D
Victoria Aldridge
Development Geology
Well Records TP 1--5
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
- CHEVRON
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (9071 265-0000
MAIL: POUCR 6-612
ANCHORAGE. ALASKA 9950:2
EXXON
To: SFO/UNIT/STATE:
(-Marathon)
GETTY Date: 12~2~82
MOBIL Trans.#: 2899
PHILLIPS CC#: 55899.
BPAE (Transmittal Only)
CENTRAL FILES (CC#' s-Transmit tal Only)
'REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
SFO/ARCO ONLY:
Y-2 GO CCL/Perf.
S-7 "-~c--h---'-'CB~V~ - --
D-2t - Sch __~~-
B-25~~s CBL
-28 Sch ' CBL/VD
5!~
5'-!
5'!
5
5'~
'2)
SFO/UN IT / STATE:
E¥16f' Dres
E-16 w Dres
E-20j Go
H-12]~ Camco
X-2 -- Go
X-14~/ Go
f .
A-9 '~ Go
D-10 Go
RECEIVEO
DATE
C/O #1 10i7-82 8650--9300 5"
Fluid Density #1 '10-6-82 8600,-9300 5"
Cont. Flow Survey #1 10-12-82 9700-:10172 5'!
Temp. Survey #1 11-.9,-82 10650-,,11200 5'!
Differ. Temp.. #1-4 10--11-,82 9.800,-10300 5"
Differ. Temp. #1-6 10-.10,-.82 11400--11800 5'!
Differ. T~p. #1 10-19-.82 9300~9930 5"
Differ. Temp, #1-4 10-9-82 ~ 10800~,11180 5"
~ ..~~~~n Mesmas
Alaska Oil & Gas Cons. ' ' '"'
............... ~l~rage
SOHIO ALASKA PEIROLEUM COMP,~NY
SFO
ARCO
- CHEVRON
3111 "C" S~REET
ANCHORAGE. ALASKA
TELEPHONE {9071 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 9950:2
EXXON
GETTY
SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
BPAE (Transm'i tt:al Only) _
CENTRAL FILES (CC#'s - Transmittal Only)
Date: 9-24-82
Trans.#: 2670
CC#: 55670
REFERENCE:
..
~,,~0 ~FINAL DATA- ~PRESSURE SURVEY DATA copy of this letter and returning it to this office:--
A-15~ GO Pressure Survey and BHPD 8/27/82
N-15-~ Otis Pressure Survey and BHPD 8/28/82
A-19 ..... Sch. Pressure Survey and BHPD 8/29/82
A-18~ GO Pressure Survey and BHPD · 8/29/82
G-19 ~ Camco Pressure Survey 8/27/82
E-15'~ GO Pressure Survey and BHPD 9/3/82 ~
E-10~'~ GO Pressure Survey 9/14/82
E-1~ GO Pressure Survey 9/14/82
E-20-' GO Pressure Survey 9/7/82
N-14 ~ GO Pressure Survey and' BHPD 8/16/82
R-7 '"~ Otis Pressure Survey and BHPD 8/19/82
N-12 "° GO Pressure Survey and BHPD 8/18/82
X-7~ Otis Pressure Survey and BHPD 8./9/82
M-16~ Camco Pressure Survey and BHPD 9/10-12/82
R-8~ Otis Pressure Survey and BHPD 9/13/82
E~ll~' Otis Pressure Survey 9/1/82
E~ll~ Otis Pressure Survey and BHPD 9/11/,82
82)
RECEIVED
DATE
Al:~k,~ Oit & G~s Cons. Commisoton
Ancho.~age
Karen Mestas
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
September 27, 1982
Alaska Oil and Gas
Conservation Con]nission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
E-20 (24-05-11-14) PBU
Enclosed, in duplicate, are the following forms for the above-named
well.
l®
e
Form 10-407, Completion Re.port;
Form 10-403, Sundry Notice and Reports on Wells;
Form 10-404, Monthly Report of Drilling and Workovers.
' Yo y~
Enclosures
CC:
J. D. Hartz
Geology
Well File #17
RECEIVED
SEP 0 1982
Alaska 0ii & Bas Cons, Gommission
ALASKA OIL AND GAS CONSERVATION C i ISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG -
1. Status of Well Classification of Service Well
OIL~I GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum ~y 81-39
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50_029-20576
4. Location of well at surface 9. Unit or Lease Name
1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM Prudhoe Bay Unit
At Top Producing Interval top of Sag River SST. 10. Well Number
944' NSL, 1319' 5WL, Sec. 5, TllN, R14E, OPM E-20 (24-05-11-14)
At Total Depth 11. Field and Pool
451' NSL, 1491' EWL, Sec. 5, TllN, R14E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
k~E = 60.54' A~LI ADL 28304
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
11./27/81 12/13/81 12/17/81 feet MS LI one
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
10265'~ 9079'TVD 110219'MD 90'45'TVD YEs [~'' NO []I 206'4 feetMD 2030l
22. Type Electric or Other Logs Run
DIL/GR/SP, GR/SP/DIL~HCS, GR/FDC/f2~L/Cal, HDT, CBL/CCL/GR/VDL, gyroscopic Survey
23. CASING, LINER AND CEMENTING RECORD
,,,
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE sIzE CEMENTING RECORD AMOUNT PULLED
20"x30" Insu~atE~d conduc~:or Surface 110' 36" 8 cu.yds., concrete
13 3/8" 72~ L-80 Surface 2699' 17%" 2627 cu. ft. ArcticsE:t II
9 5/8" 47~ L-80 Surface :9458' 12¼ 1292 cu. ft. Class G
130 .cu. ft. Arctics~;t I
7" 26~ L-80 8960' 10265' 8~" 438 cu. ft. Class F w/i8% salt
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER, SET (MD)
Prudhoe Oil Pool Top: 9930' '~7~9; 5~"2 9052' 8890'.
Bottom: 10100 ' 8895 '
9930'L 9-~74~'BKB'-(~9'--8776'~sS) ...... 2(~. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
9954'-- 9996'BKB (8787'.8818'TVDss) .' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL.=, USED
' 10011'-10065'BKB (8829'-8870'TVDss)
10076'-10100'BKB (8878'-8895'TVDSS)
, ,
27. PRODUCTION TEST .
Date :First ProdUction, r ' ' '" .Method of Operation (.Flowing, .gas. lift, etc.)
08/31/82 Flowing .
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-M'CF WATER-BBL CHOKESIZE IGAS-OILRATIO'
. . TEST PERIOD I~I "'
FlowTubing CasingPressure 'CALCULATED OIL-BBL GAS-MCF WATER-BBL . OIL GRAVIT'Y-API (corr)
· Press. -. 24.HOUR.:RATE I~': ' . '
,
28. CORE DATA
Brief description of lithoiogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
·
·
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. C,~=TH GOR, and time of each 13hase.
BKB Subsea
_
Sag River SST. 9460' 8405'
ShublJJc 9493' 8431 '
·
Ivishak 9544 ' 8472 '
,
None ' ,~
Sign _ ~'~ ~~L~ TitleDistriCt Field Date
f × ~. d~. ~sga ~1 Ehg~neer
INSTRUCTIONS
General: ;,Th:is form is d. esigned for submitting a complete and correct well completiOn report and log. on .~'.
all types df lands and lea'Ses in Alaska.
Item 1' C~aSsification::of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which' elevation is used as reference (where not otherwiseishown) for depth measurements
given in other spaces on this form andilin any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and ir~ item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27i Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
STATE OF ALASKA
ALASKA~ AND GAS CONSERVATION C~"~'~MISSION
SUNDRY NOTICES AND REPORTS N WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
Sohzo Alaska Petroleum Company 81-39
3. Address 8. APl Number
Pouch 6-612,Anchorage, Alaska 99502 50- 029-20576
4. Location of Well
At Surface:
1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
~.-20 (24-05-11-14)
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
KBE = 60.54' AMSL I ADL 28304
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
[]
11. Field and Pool
Prudhoe Bay
Prudhoe Oil' Pool
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] ~ 'Perforations J~] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The follwoingintervals were perforated August 31, 1982, using Dresser Atlas2 5/8"
carrier guns at 8 spf. A lubricator was installed and tested.to. 3200 psi on well
work.
9930' - 9940' BKB (iRef. B~CS/GR, 12/21/8~)
9954' - 9996' B~
10011' - 10065' BKB ( " )
10076' - 10100' BKB C " )
An SSSV was set and tested in the ball valve nipple at 2064'.
RECEIVED
SEP 0 ]982
Alaska Oil & aaa Cons, Commission
Anehorage ·
14., her~erti~tha, t.~g~g ~ true and correct to the best of my knowledge. '
Sign~l"_//~~~ ~ 'Title ~_~cr~*l-_ Field Eno~eer
The Ra~ belo~3ommi.ion us~
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-14~0
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well
Workover operation ["]
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchoraqe, Alaska 99502
4. Location of Well
at surface
1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
KBE = 60.54.' AMSLI ADL 28304
For the Month of .... September
7. Permit No.
81-39
8. APl Number
50- 029-20576
9. Unit or Lease Name
10. Well No. "
E-20 (24-05-11-14)
1 1. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
,19 82
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner run and quantities of cement, results of pressure tests
14. Coring resume and brief description
15. Logs run and depth where run
RECEIVED
6. DST data, perforating data, shoWs of H2S, miscellaneous data
See Attached
SEP 0 ]982
Alaska 0il & Gas Cons, Commis~ion
Anchorage
1 7. I herebv l~tif¥~ing is :rue and correct to me best of my knowledge.
I SIGNED/'~~-.~D~~ TIT E District Field Engineer
~ ~. ' ~ ~ DATE
Oil and Gas Conserv~on Commission by ~he 15th of ~he succeeding month, unless otherwise directed.
Form 10404 Submit in duplicate
Rev. 7-1-80
PERFORATING DATA - Well E-20 (.24-05-11-14)
August 24, 1982:
Pressure tested tubing and inner annulus.
August 31, 1982:
September 4, 1982:
Rigged up Dresser Atlas and perforated the following
interVals using 2 5/8" carrier guns at 8 spf:
9930' 9940' BKB (Ref. BHCS/GR, 12/21/81)
9954' 9996' BKB ( " )
10011' 10065 BKB (. " )
1007'6' 10100 BKB ( " )
Put wellon'production.
Shut well in to prepare for static pressure survey.
SePtember.6, 1982.:
Ran static pressure/temperature survey at 8800' TVDss.
September 9, 1982:
Set and tested SSSV in ball valve nipple at 2064'.
Well on production
RF.C IVED
SEP 0 1982
Alaska Oil & 6as Cons, Commission
Ancl~orage
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
July 1~, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V..Chatterton
WELLS R-8, Y-10, Y-13, A-15, A-18, A-19,
E-10, E-15, E-17, E-18,~2Of
E-21, G-18, M-15, M-16, M-17
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named wells. This contains
our. proposal to perf. orate, the wells/~
d Eng±neer
GJP: JLH: ybr
Enclosures'
cc: J.D. Hartz
Geology
Well File #17
O~1~_ STATE OF ALASKA tl
ALASKA ' AND GAS CONSERVATION CO MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL
COMPLETED WELL []
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 81-39
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of Well
At surface:
1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE - 60.54' AMSL
12.
I6. Lease Designation and Serial No.
ADL 28304
8. APl Number
50-- 029-20576
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
E-20 (24-05-11-14)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
(Submit in Triplicate)
Perforate ~ Alter Casing [] ', Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals will be perforated during July/August 1982 using Dresser
Atlas 2 5/8" carrier guns at 8 spt.
A lubricator will be installed and tested to 3500 psi on all well work.
9930' - 9940' BKB (Ret. BHCS/GR, 12/21/81)
9954' - 9996' BKB (Ret. BHCS/GR, 12/21/81)
10011' - 10065' BKB (Ret. BHCS/GR, 12/21/81)
10076' - 10100' BKB (Ret. BHCS/GR, 12/21/81)
An SSSV will be set and tested in the ball valve nipple ca. 2000'.
Subsequent' Work Reported
on Form No./~Datecl
Signed// ~ t'~¢'~ Title District Field Engineer
Thes~ac~belowf~mission use ~.J. Pl:].sga
Date
Conditions of Approval, if any:
Approved b¥ ~ LtlI{NJ[ C, SMIIli COMMISSIONER
Approved .:opy
Returned
the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
January 18, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well E-20 (24-05-11-14)
Enclosed, in duplicate, is Form 10-407, Completion Report, for
the above-named well together with the Well History, Well Logs,
and Directional Surveys.
'This well has been completed as a non-perforated oil well.
RHR: ja
Enclosures
cc: Well File #17
Geology
Yours very truly,
District Drilling Enginee'~
STATE Of ALASKA ~
' ALASKA O~i'L ,~,4D GAS CONSERVATION COI~,,,'ISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum Company 81-39
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20576
4. Location of well at surface 9. Unit or Lease Name
1743' SNL, 883' WEL, Sec. 6, TllN, R14E, OPM '~[OCAT1ON~I Prudhoe Bay Unit
At Top Producing Interval top' of Sag R. SST. VERIFIED i 10. Well Number
944' NSL, 1319' EWL, Sec. 5, TllN, R14E, UPM i Surf. . ~ E-20 (24-05-11-14)
At Total Depth ' B.H. ! 11 Field and Pool
451' NSL, 1491' EWL, Sec. 5, TllN, R14E, OPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 60.54' AMSL ADL 28304
12. Date Spudded11/27/81 13. Date T.D. Reached12/13/81 14. Date Comp., Susp. or Aband.12/17/81 '115' water Depth' if °ffsh°re feet MSL 116' N°' °f C°mpleti°nsOne
17. TotaISepth(MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set I 21.Thickness of Permafrost
10265'MD 9079'TVD 10219'MD 9045'TVD YES~ NO[~ 2064 feetMD 2030'
22. Type Electric or Other Logs Run
DIL/GR/SP. GR/SP/DIL/BHCSo GR/FDC/CNL/Calo HDTo CBL/CCL/GR/VDL° avroscoDic survev
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulated Conducto: Surface 110' 36" 8 Cu.¥ds. concrete
!.3' 3/8" 72# L-80 Surface 2699' 17 1/2" ~.27; cu.ft. Arctics6t II
9 5/8" 47# L-80 Surfa6e .9458' 12 1/4" 1292 ~cu.ft. Class G;
130 cu. ft. Arcticset I
' 7" 26# L-80 8960' 10265' 8 1/2" 438 cu.ft. Class G ~/18% salt
24. Perforations olpen to Production (MD+TVD Cfr Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
5 1/2" 9052' 8890'
None
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
· · ~ ~ DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
·
) ,
· , ,
, ,
·
27. PRODUCTION TEST '
·
Date Fi'rst ProductiOn , · I Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERI,O.D I~ ..'.,
Flow'T~bing" Casing Pressure ~ CAL~CULATED OIL-BBL GAS~McF WATER-BBL OIL GRAVITY-APl (corr)
'" [~24-'HOU R RATE.
~ Press. .
28. CORE DATA
-Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
,.
,
None
·
·
·
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. ' *" 30. ..... ' ·: '
_
GEOLOGIC MARKERS FORMATION* TESTS '
.
·
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
·
BKB ' Subsea
·
Sag River SST. 9460' 8405'
Shublik 9493' 8431'
Ivishak 9544 ' 8472'
31. L~S:T OF ATTACHMENTS
.Well History, Well Logs, Directional Surveys
32. . [ hereby certify that the foregoing is true and correct to the best of my knowledge
sH'~ 'llH/"'/;'~'Signed ~
~d?~ Y/ ~-.
District DrilAing Date I '"
Title
Enqineer
RUCTIONS
General: This form is designed for Submitting a complete and correct well completion report and log on
all types'of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
Water disposal, water supply for injection, observation, injection for in-situ combustion.
·
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given .in. other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (mu~Itiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in .item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any rr~Ultiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
~.T. E-20 (24-05-11-14)
W~LL HISIORY
Spudded well at 1430 hours, November.27, 1981. Drilled 17 1/2" hole to 2699'.
Ran 69 jts. 13 3/8" 72~ L-80 Buttress casing to 2699'. Cemented with 2627
cu. ft. Arcticset II cement. Installed and tested BOPE. Cleaned out to 2587';
tested casing to 3000 psi, okay. Drilled out to 2718', ran leak-off test to
0.73 psi/ft, gradient. Directionally drilled 12 1/4" hole to 9458,. Ran open
hole logs. Ran 247 jts, 9 5/8" 47~ L-80 Buttress casing to 9458'. Cemented
in two stages: First stage with 1292 cu.ft. Class G cement; second stage
through D.V. packer at 2603' with 130 cu. ft. Arcticset I cement preceded by
Arctic Pack. Cleaned out D.V.; tested casing to 3000 psi, okay.. Cleaned
out float equipment and directionally drilled 8 1/2" hole tc~ 10265'. Ran
open hole logs. Ran 31 jts. 7" 26~ L-80 IJ45 liner to ].02.65'. Cemented
with 438 cu. ft. Class G cement with 18% salt. Cleaned out to 10220', tested
casing to 3000 psi, okay. Changed well over to NaC1; ran CBL. Ran 212 jts.
5 1/2" 179 L-80' IJ4S IPC tubing to 9052'. Landed tubing with ball valve at
2064'. Installed and tested tree. Displaced tubing to diesel; set packer
at 8890'. Tested tubing to 3500 psi, okay. Released rig at 2400 hours,
December 17, 1981.
SOHIO ALASKA PETROLEUM CO.
ontrolled
Drilling
PAD. E (24.05 · II · 14) ~,
E.20 '~
Consultants
LES HENDEI~SON
349-3114
Controlled Drilling Consultants
P.O. BOX 1189
PALMER, ALASKA 99645
M~. Brian Rose
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, AK 99502
Dear Mr. Rose
RE: Magnetic Single Shot Survey
3ob No. A1281-008
Well E-20 (24-05-11-14)
Prudhoe Bay Field
North Slope, Alaska.
Date of Survey: 11-29-81 to 12-08-81
·
Please find enclosed the "Original" and six (6) copies of our
Magnetic Single Shot Survey on the above well. Radius of Curvature
was the method in calculating this survey. The depth interval of
the survey was 2665 to 9356,
Thank you for giving us this opportunity to be of service.
Yours very truly,
Controlled Drilling Consultants
c_. :.- h:--,
Terry V. Henderson
Directional Supervisor
COMPLETION REPORT 09 DEC, 81
SOHIO ALASKA PETROLEUM . WELL E-20
-HAGNET'IC £:[NGL'E"SHOT SURVEY ' K B ELEV
RADILJS OF CURVATURE 'HETHOD OF COMPUTATION
_C. OMPUT. E_D..~OR CDC. BY..F~_~_D~EY & ASSOC~ ...........
RECORD OF SURVEY
TRUE ' · :. ~:' .,:' .
· .
~'~_~RI?~_.VF.~.ICAL SUB.-','' DRIFT .. TOIAL_.C.OORDINkTES.. C L 0 5 U_R .E._S ...... SEVERITY .... SECTION~
DEPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE DEG/IOOFT DJSTANCE
D H DEG, D N 5
0 0 0 0'-;'00 -60.54' S :O.OOE 0'66
:: :. :: .. .
ASSUMED VER_-r_.I_,C__AL_._~.O_. 2665 .:'F'T.;:: ' ?:'::: ;..::' !:': ':~:; '::: ~' ;':'; :';, ............................. ' ' :: .................... :_,. :: ....
0,00
2849 2 30 2848.09 2787.55 &72.00E 47.03 5 34.17 E 58.13 S 35 59 59 E 0.088
2942 6 30 2940.79 2880.25 S56,00E 50.22 S 40.70 E 64.64 S 39 I 37 E 4,307
3037 9 45 3~3~,'§2 2974'28 555'OOE ~-"~'~82 'S : .... 5i,~7 E"' 77,61
3131 11 30 3127,20 3066.66 .' S55,'OOE 67.76 S ' '65,96 E 94,57 S 44 13 47 E' ':" 1,862
· .
3225 13 30 3218,97 3158'43'/S5'~".00E 79,57 $ ,... 82,53 E 114,64 S 46 .2 34_..~I ............ 2,128
33I'~-].'6 .... i'~ ..... ~3'09.81 ~'~-~ $53,0~E ......... ~'93 5 101,92 E 138,60 5 47 20 14 E 2,927
3412 18 45 3398.50 3337,96 S54.00E 110.56 S
3538 21 0 3516.99 3456,45 554,00E 135.74 5
.... ' b4.o'6 35 3.52 '$50.0o .......... tS'?*53 s
7 27 15 3717,10 "3656'56'~ :$53,00E 190.71 5
·
3850 30 I5 3798.62 3738~08 S49'00E 2~8,85 S
124,40 E 166.43 S 48 22 14 E 2.690
159,05- E 209,10 S 49 31 19 E 1',786
186.94 E 244.47 $ 49 52 50 E 2.484
228.66 E. 297,75 S 50 10 14' E 3.239
263.41 E' 342.47 S 50 16 43 E 3.405
57,56
64.39
77,55
94,57
114.58
138.38--
165.96
208.16
243,21
296 · 07
340,46'
-3951-'34"45 3883;78 ...... ~g~':~';27~-'--5~+'8';00E ..... 254.80 S'
4424 36 45 4267.64 4207,I0 549,00E 437,90 S
4897 35 45 4649.08 4588,54 S47,00E 625.04 S
--5.~--~/~-45"'5'0~34,53 4973e99 547;~'E ..... 810'82 S' 918,07 E - '1'224.86 S 48 32 98 E 0.212
..
5807 33 ~5 5396.57 5336.03 545.00E 982.05 5 1095.38 E 1471.~5 5 ~8 7 21 [ 0,268
6311 33 45 5815.63 5755,09 S~3,00E 1183~46 5 1289,88 E ·1750.54 5 47'27 49 E ........ 0e220
-6782-33'~0 ..... ~267.82 61~7,28 543-;~0E ......i37'4;21'5 i467.76 E ~2010'.67 5 46-'53 '6 E 0,053
7060.33 ~5 6439.31 6378.77 S43,OOE ~86,80 S 1572.75 E 216~.28 5 ~6 36 32 E 0.090
7540 31 ~5 68~2.99 6782,45 543,00E 1676,70 5 1749,83 E 2423.~8 5 46 13 21 E 0.417
--79"~-?--29"~'0-7167,38 77'~-~6-'2-~-~--~-~3;0'0E" 18i7.'~5 5 1880.80 E '
'304.04"E 396,70 5"5'0- 2" 8'E ...... 4,467 ....... 394.55--
511.00 E 672.97 S 49 24 18 E 0,430 670.06
718,84 E 952.58 S 48 59 33 E 0,256 949,08
1221.13
1467.48
1747-48
..... 2'008
2162,17
2421.77
2615.23 5 45 59 10 E 0,597 2613.78
SINGLE S~-IOT SURVEY
........ o9 'DEc. 81
RECORD OF SURVEY
TRUE ...... = ..... ;_= _ ..................
'-~i ~'~-S ~--'L~R I FT ' vERT I CA L SUB DRIFT TOTAL COORDINATES
DEPTH ANGLE DEPTH SEA DIREC
D M DEG.
8413 90 1.5 ?.597.~+? 75~6'9:~..:::S~0'00E:- - - 2002.16 S 204~+,A9 E
P,~ '., 31 15 8029,74 7969,20 S36'OOE 2204,-/8 S 2202,79 E
.... 9~'I~2'-'35 .... 15 ..... 8335'76 ..... 8'~'"/'5,-~-2 5~'O;'O'O-E 2-372;97 5'2312.'02 E
DOG LEG
C L 0 S U'R"'E'S ....... SEVERITY
DI STANCE ANGLE DEG/iOOFT
D M S
2861,57 S 45 35 57 E 0.215
3116.63 S 44 58 26 E 0,292
9313.07 $' z+4'15 1"6 E 1'o222
EXTRAPOLATED TO TD,
,
BOTTOM HOLE CLOSURE- 3354,48 FEET
SECTION
DISTANCE
2860,56
3116,24,
3354,.~8
'SO~'i 5- ~',[EEL
MEASURED DEPTH AND OTHER
DATA
SINGLE SHOT SURVEY
FOR.EVERY EVEN iO0 FEET OF SUB
SEA DEPTH,
09 DEC, 81
TRUE
....... ~;i~UREb ....... VERTICAL SUB ,. :MD-TVD
DEPTH DEPTH: 'SEA' ;'DIFFERENCE
161 161,
261 261,
361 361.
461 461,
561 561,
..... 66 i .............. 6'6i
761 761
861 861
9g'l ................ 96-1
1061 1061
.~! ~ _z ................ 11 _6_i __
1261 1261,
1361 1361,
VERTICAL
CORRECTION
"300:
400
' 500 .....
100 0 0
200 0 O
::0 0
600
700
800
. ' · .900
0
1 ooo "o
11oo' .'. o
1200 0
1300 0
0
0
0
0
0
0 '
0
0
0
0
TOTAL. COORDINATES
0.19
0,51
0,99
1,61
:2,38
3,29
4,34
5,53
6,85
8.30
9.87
11.55
13,34
S 0,00 E
$ 0,02 E
S 0.07 E
S 0.16 E
S 0,29 E
S 0,48 E
S 0.73 E
S 1,06 E
S 1,47 E
S 1,97 E
S 2,58 E
S '' 3,29"E .........
S 4.12 E
1461 1461
1561 1561
1661 1661
1761 1761
........... 186-i ........ 1'861
1961 1961
2061 2061.
2161 2161
~ 2261 2'26
236].' 236
2461 246
2561 256
'1600 0
1700 0
1800 0
1900 0
1400 0 0 15
15oo: o .........: ..... .':0 .......... i?'
0 19
0 21
O' 23
0 25
1, 2200 0
i, ........ 23.00___ .... o ..............
1. 2400 0
1. 2500 0
2000 0 0 28
2100 0 0 30
0 32
.. 0 · 35
0 37
0 40
3372
3478
-- 3585
2661
2761
2861
2962
-- 3063 ..........
.3165
3268
2661., 2600 0
2761, 2?00 0
2861, 2800' 0
2961- 2900 1
3061, 3000 2
3161, 3100 4
3261, 3200 7
3361, 3300 11
3461. 3400 17
3561, 3500 24
0
0
0
1
1
2
3
4
6
7
42
44
47
51
60
71
85
103
123
146
.23
.21
,28
.43
,64
.91
.22
,58
.97
,37
.79
.20
.60
.97
.22
.54
,41
.79
,78
.17
.36
.13
S 5,08 E
S 6,17 E
S 7.39 E
S 8.76 E
S '-' 10.28 E ................
S 11.96 E
S 13,79 E
S 15,79 E '
S 17.95 E
S_ . 20,29..E ..................
S
S
S
S
S
S
S
S
22,79 E
25,47 E
28,33 E
31,36 E '
. .
34,71 E
42.66 E
55,46 E
71.68 E
90.99 E
'114.32 E
142,01 E.
172,85 E
-~,OilIo' ~.~/E'EL E--2'O''
.......................... sinGLE SHOT ,%URVEY
· _
09 DEC.
81
MEASURED DEPTH AND OTHER DATA FOR EVERY
EVEN 100
FEET OF SUB SEA
DEPTH.
TRUE
FqE-A§U'RED ........ VERT I CAL ,SUB · MD-TVD ....
DEPTH DEPTH SEA DIFFERENCE
VERT I CAL
CORRECTION
3694
3806
' 923 ......
4045
4291
4415
4540
4664
4788
5157
5279
5qOl
5522
3661, 3600 33
3761, 3700. 45
386i. 3800. ,::6~'' ...........
3961, 3900· '. '84
4061. 4000. 106
4161. 4100 130
4261, 4200 154
4361, 4300 179
~.461' ' 4400 : 203 '"
4561,' 14500:'::'..!'227
4661, 4600' '250 :
4761. 4700 273
4861, 4800 296
4961. 4900 318
5061, 5000' 340
·
5161, 5100 :' 361
9
12
17
22
22
24
24
25
24
24
23
23
23
22
22
21
564
5764
5361. 5300 403
5884 5461. 5400 423
6004 5561 · 5500 443
6'i2 ............... 5600
6245 5761, 5700 ' 484
6365 5861, 5800 504
6485 5961,
6605 6061.
5900
6000
...... 6100
6200
6300~
6400'~<
524
544
......... 5.64
584:
604 :
624' :'-
644
663
682
7OO
717
21
20
20
20
2I
20
20
20
20
20
20
20
2O
19
19
18
17
16
6725 ....... 6.161,
6845 6261,
6965 6361,
7085 6461,
7205 6561. 6500
-7324 6661, 6600
7443 6761. 6700
7561 6861. 6800
'7678 6961. 6900
7794 7061- 7000
TOTAL COORDINATES
173,64 S
204.91 .':5
244,33 S
290,76
337.89 .%
385.82 S
434,37 S
483,43 S
..
532,48 S
581,56 S
630,62 S
679,47 S
727.81 S
775.69 S
823,13
870.44 S
917.74
965,02 S
1012,35
1059.97 S
1107.94
1156,59
1205,39 S
1254,08 S
1302.68 S
13.51,19 $
1399,66 $
1448.24 S
1496,94 S
1545,37 S
1592,68 S
1639,09 $
1684,62
1729.05 S
1772.28 S
206,66 E
246,80 E
292.35 E
344,12 E
397,07 E
451.41 E
506.95 E
562,93 E
6~7,89 E
671,86 E
724.82 E
777.21 E
829,05 E
880.39 E
931.23 E
981,22 E
1030,24 E
1078,30 E
1125.52 E
1172,24 E
1218,53 E
1264.71 E
1310.33 E
1355,73 E
1401,05 E
144_6..29__.E
1491,49E
1536.79 E
1582.21 E
1627.36 E
1671.48 E
1714.76 E
1757,22 E
1798.65 E
1838.96 E
. . .
.SOHIO WELL E-'20
HEASURED DEPTH AND
SINGLE SHOT SURVEY
OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA
TRUE
M, EASURED .... V'ERTI-(~,L SUB
DEPTH DEPTH
7909 73.61,
802~ 7261,
8139 7361,
8255 7461
8486 7661
8602 7761
87].9 7861
8835 7961
,8952 8061
9070 8161
9190 8261
9312 8361
SEA DIFFERENCE
MD.TVD-~ VER~ ICAL'
CORRECTION
7100 748
7200 763
"7300 '~778 .
,:: :7400 79A- :
.
· '~::~750'0' ,.::~:'"'809 "'" '
· 7600 825
· 7700 841
· 7800 858
· 7900 ' 874
· ~-::8000 891
,"'!:: ':8,1100:' 909
, 8200 929
· 8300 951
15
15
15
16
15
16
16
17
16
17
18
·
2O
22
TOTAL
DEPTH·
.
09 DEC ·
81
COORDINATES
1814,26 S 1878,11 E
1855,96 S 1916,61 E
1898,39 S 1954,79 E
1941,85 $ 1992,99 E
1985,62 $ 2030~53 E
2030,52 S 2068,0l~ E
2076,31 5 2105,06 E
2123.41S 2141.92 E
2171·02 S 2177,94 E
2220,03 $ 2213,75 E
2272.22 S ~_.22~9.~.52 E .....
2328,`22 S 22'85,24 E
2387,96 S 2320,67 E
.z
SOHI6 WELL £'-20
SINGLE
SHOT SURVEY
'[r,~TERP'OLATED VALUES'FOR--EVEN zooo--"~E~.'T OF ~4EA'£URED DEPTH.
TRUE
...... Z~I~ A,~O'R F~ D V ER'f'! CAL SUB ......
I)EPTH DEPTH SEA TOTAL COORDINATES
1000 999, 939, 7.41 S 1,66 E
2000 1999. 1939, 26,80 S 12.65 E
3000 2998, 2937, 54,48 S 46,95 E
4000 3923. 3863. 273.52 S 324,87 E
5000 4732. 4672"' 655,97 S 762.74 E
............ 6090 .............. ~57. 5496. 1058.38 s lZ70.69 E
7000 6389, 6328, 1462.44 S 1550.03 E
8000 7239, 7179. 1847.22 S 1908.60 E
9000 8101. 8040, 2240.81 S 2228.31E
. .
09 DEC. 81
.
...... ~ : --' - - ...... t' ' -
J . ·
I ' - ' 'IORIZONTAL VIEW
i -~ ....... ; ' J ..... OHIO ALASK/~ PETROLEUIV
!
WELL E-20 (~t-O5-11-14,
~A D_ IUS_OE_ CU~ R_V_A_T.U RE
MAGNETIC SINGLE-SHOT
,SCALE' I"-' jOOO' .-' '
DEC. 1,0~ 1981 ' :
:_
· . ·
· .
1.
* [-t J ' ' ·
._i.~i _-~- i"' ~, ..... . . -: -
.- ._ j.._:.:_:_. -___:..:-_:.?.': ....:: ......
I
;
·
.
· J ''
. .
I
.....................................
j :. i ......... t !-
? . - ! ......... J ~ ....
--1
___1._ =
· ,ow,i
'ARE TVD .............
December 22, 1981
Mr. Gary Plisga
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Re: Our Boss Gyroscopic Survey
Job No. Boss-16947
Well No. E-20 (SEC6 TllN R14E)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: December 21, 1981
Operator: Thomas McGuire
Dear Mr. Plisga:
Please find enclosed the "Original" and sixteen (16) copies of our
Boss Gyroscopic Multishot Directional Survey on the above well.
Thank you for giving us this opportunity to be of service.
Yours very truly,
NL SPERRY-SUN, INC.
Ken Broussard
District Manager
KB/pr
Enclosures
.CON !DF_NT A L
STAT ,.qlf' ,ALASKA , - '
i_SOH.!O..ALASKA PETROLEUM COMPANY
~ E-20 (SEC 6 T11N RlqE)
PPUDHOE BAY
?..ALASKA
.................... I. RUE ............ SUB.SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
..................................... $'PERRY-SUN' WELL SURVEYING CoMpANy :].
PAGE
INCL
DE
ANCHORAGE~ AL'ASK A
C 0 M'pU TA T I ON'-~'A-T ~
DECEMBER 22, 1981
BOSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-16947
.KELJ. J__B_U.S_H I N G F L F V. = R O- _5 A
C 0 U R S E .... :L Co u Rs. E_.,___ _ DO G .- L.E..G _J_O IAL : . ' '
INATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL
G MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION
100 100.00 59,46 0
2 00 ................ 199 '9 9 .............. 13 9.4 5 ............ 0
300 299.99 239.45 0
0 399.98 339.44 0
0 ......... 4.99....96___: ....... ~+3.9 ,.42 ............ 1
40
70
90
0 599,94 5;59,40 0
0 699.93 639.39 0
0 ............ 79.9.,92 ........... 739.38 ................ 0
0 899.91 839.37 0
1000 999,91 939.37 0
.... 1.1.00 ........ 109.9_.~ 0.., ....... 1039,.36 ............ 0
1200 1199.90 1139 36 0
1300 1299,89 12.39,35 0
1~_00 .... 1399,89 ......... 1339,35 .... 0
1500 1~99,88 1~39.36 0
1600 1599,87 1559.33 0
1~0.0 ....,_. 1_6 99..86 ......... 1639.32
1800 1799.86 1739.32
19~00 1'899.85 1839.31
2000 1999.85 1939.31
2100 2099.84 2039.30
2200 2199.85 2139.29
o
0
0
0
0
0
.... 2.3_0Q ............... 2299..83 .......... 22.39.,29 ........... 0
2~00 2399.82 2339,28 0
32 ....... _$_-66.' 5 9._E _,.-"22~,~SSS:~.. '.~:. ::.L_ ._2.~._._,S 1 .,_5_0 ;i '-
37 S 39.80 E .28 .84 S 2.28 E
57 S 19. 0 E .42 2.05 S 2.90 E
8 ........... S ._13_.~. 9_ .E .... ~, .... __.22 ............. ., ...5_..8..0_S .... 3..~rl E
. · . 3.72
55 S 6.19 E ~' 5.58 S
37 S 45.89 E .4! 9.52 S 4.87 E
36 S 62.89 E .18 10,14 S 5.72 E
40 .... S_60 .. O_E .... . ..... ,~_9 1.0_,.6.7_S ~ -7 o._ E
37 s ' 72.3 o E ~ '~ ;:~15~..i:!~i~-:~i;~ili.~.~!i//~ !11.1 A s 7.7'4. E i
31 .... Nii~,86,.Bg..E~ : .' ._9_,.5, 6 E .........
42 N 79. 9 E .20 11.26 S 10.61 E
48 N 90. 0 E .18 11,14 S 11,92 E
44 ......... N_75.., A_O_E ...... . ..... .2J___ .... L0_..9_8_S_ ] :3.25 E ·
27 N 76'5 ' 10. 0 S 1
--' : :. .'. ' ' .2. :
24 .......... ~L .G 6' 40..:E ?': -; ...~=~-~..0.91. __LO_._O_7_S.: 'I ~_OJ~ ii._ EL!? .... :: 1
Z~l N 81.40 E .31 9.85 S 17.00 E 18.16
/~9 N 75,80 E ,16 9,56 S 18,30 E 18,74
,35 ......... $_?.5_, 19 E_ .,.~~3 9_,3_~__S__ 19,5_1 :E 19_,.;57__
· . %
0,00'-"~
L,.LO__
2,06
3,39
5 -_ .Q9
6,69
8,06
10.52
11,52
12,_55 _-
13,55
14.30
.14...87__ ...........
15.39
16,10 ~
&. 7_P.,
7.20 ,,
7.53 '
7_._78
'2500 2499,82 2439.28 0 30 ': S 12. 0 E'
........ 260.0 ........ 2599,81 ............ 2539 · 27 ....... 0 .~ 23. ........... . S .... '_7..,.. O_f ........... ,:1.6'' ~' ~>':' .iL'-5.8_. $:~ S.: ':': ::'? .:20.. 37
2700 ,'¥;~699,81 2639,27 0 28 S 35.10 E .23 12-22 S 20-65 E 22.27
2800 2799.79 2739.25 1 31 S 62,30 E 1.12 13,17 S 22,06 E 23,89
2_9_00_ ....... 28.9~_,_6! .......2.839.0] .............5 ..... 9 S .62_,.3.9__E ..........3~,.63 ......... 15_,_87 $ .27.,2~ .... -' 29,17 .......
3000 2998,78 2938,2~ 9 22 S 55,59 E ~,30 ii. i::' . '.22,55 .S : ~0 99
. . .-. / - ... . ,.
: .; .-,
SOHIO ALASKA PETROLEUM COMPANY
E-20 (SEC 6 T11N R14E) COMPUTATIO~-'D'ATE
PRUDHOE BAY DECEMBER 229 1981
ALASKA
'
MEASURED
DEPTH
ANCHORAGE, ALASKA ,: ,-
DATE OF SURVEY DECEMBER
BOSS GYROSCOPIC SURVEY
,JOB NUMBER BOSS-16947
KELLY BUSHING ELEV. : 60,54
~ ',:.:~..' ..>'~,~.'. ~ OP~'R-~';r-O'R-THOMAS<.:,J MCGUIRE
TRUE SUB-SEA COURSE COURSE DOG'LE'Gi- I ' TOTAL
VER'TIC'A'L ........ vE'R'TICAL' ....... INCLINATION .... ~I'RECT-I'Or~' ....SEVEriTY · RECTA'N'G-O[-A'P, COORDINATES
DEPTH DEPTH DEG MIN DEGREES 'DEG/iO0 NORTH/SOUTH EAST/WEST
PAGE 2
21, 1981_
FT,
v E R TfC'A' L--
SECTION
316"0 ........ 3'0'9'7~'-09- ....... 3b'56'5·5 ................ 11' ' ,]'7 .....S--56·."1-9 E · 2·'2~57'<<?·<!:·· <~ :32,75
3200 3194.75 3134'21 13 10 S 53.39 E.:
3400 ~386.78 3326.24 19
3500 5480.77 3420.2~ 20
..... 3.600 ....... 357.3,.52 .......... 35.!2~,.9.8 ......... 23
3700 3664.34 $603.80. 26
~800 ~752.62 3692.08 29
........... 3~00 ...... 38~.7..67] ......... 3777.!,3 ..... 53
~000 ~919.~5 5858,81 36
4100 3999,3~ 3938,79
4200 4079,30 4018,76 36
4~00 4159.45 4098,89 ~6
4400 ~239,60 4179.06 36
~600
~700
4800
~900
50.00
L._5100
5200
5300
5400
5500 5133.58 5073.04 34
5600 5216,01 5155,~7
......... 5700 ....... 5298.73 .5238.19
5800 ..:5381.&9 5321.15 53
5900 5~64,77 5~04.23 33
.... 6_0_0.0 ......... 5547.72 ........... 5487.18 ........
6i00 5630.5~ 5570.00 34
S
S
S
~400.52 4359,98 36
~481,28 ~20,7~ 36
4'562.30 450!,.~ ........ 35
4643.43 4582.89 35
4724.55 4664.01 35
4805.82' 4745.28 35
4887.39 4826.85 35
4969,38 4908.84 34
5051.47 4990.93 34
12 S 51.60 E 3.10 79.20
42 s 51.89 E i.si 100.32
10 $ ~9, 0 E 2.70 12'+.15
i 5 ........ S-'4e-:~'9 ~E~' ~ ~L'O~9:::.:i::::i??i;-.::~!~i51.75
~0 ...... S ...~ 6.'3 0 .:': E:~' '::
45 S 46.~9 E 3.08 259.35
1 S e6.lO E .28 300.9~
45 S ~.~0 E .27 3~2.57
52,99 E '
7 0.51.:. E:...
90,60 E/<..
78.78
103,16
114.q$ E
141.23 ='_
170.01 E
132.55
165.63
202,06
274 · 3' 7:': E<> ""
243
289
341
,09
,29
.20
315.96 5
359.25 E
402.51E
398.21
457,58
516,95
22 S 45.10 E'
15 s ~'5'Tg'~ E
1 S 45,69 E
S ~5.19 E
· 72.: 467.08 S
. ~ 8 5'o-8-'%-?-'s --
· 24 549, 86 S
· 40 590,98 S
~+45.62. E
.:'
488.7
531.29 :E...
573,47
615,67
657,45
576,11
635.22
694,16
752.83
811.22
869,28
31 S 43.60 E i ; .53::" ' 716,15
9 ...... s ~s',i'9 E .44 75-8". 17
~e s 42.so E .68 8oo.21
57 s ~i.8o E .39 8~2,62
38 ....... . <~ .56 885,27
19 S 41, '0
~ · . . . .
3 S 39,69 [.' ,78., 970.65
~9 S 39.30 [ .33 1013.73
S
S
S
:'S' ' 780,05':''':' i' ? 1043.24
S 819,7-7' ~E ....... 1'i' O-O'
S 858,63 E 1157,79
896,89 E 1214,73
· 9.34.81 >'E;: ;'.:'.i:/~:. ~ ' 1-2 ? 1 · 66
972.~4:?/'E~:<~ .~'~; ~328. z 5
~008,52.~: ~'. : 138~,27
S 1044,04 E 1440,07
49 S 39.10 E .11 1056,87
q S 39.39 E .29 1100.12
S 1079,22 E 1495,72
S 1114,55 E 1551,5~
5 S. 39'30 E ~ ,06~'. .i~.: .1143,45
:
S 1150,09 E 1607,56
'SOHIO_ALASKA.PETROLEUM COMPANY
E-20 (SEC 6 TllN R14E)
PRUDHOE BAY
,_ALASKA
..... TRUE ........ SUB~SEA~
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
6200 5713,45 5652,91 33
6300 5796,67 5736.13 33
6.40.0 5880,18 .......... 581.9.,6a
6500 5964.08 5903,54 32
6600 6048.00 5987,46 33
670.0 ........... 613._1~,50 ......... 60Z0.96 ..........
6800 6214.95 6154.41 33
6900 6298.22 6237.68' 33
........ 7.00.0 ......... 6381,10 ........ 6320.56 ....
7100 6464.08 6403.54 33
7200 6547.21 6486,67 33
........ 7300 ............. 6630.,.77 ......... 6570.23 32
7400 6715.15 6654'61 32
7500.. 6800,08 6739.54 31
........ 76.00 .......... 6885.42 ............ 6824.88
7700 6971.19 6910.65 30
7800 7057.45 6996.91 30
790.0 ............ 7.1~2.6 ............... 7083_.72 ..... 29
8000 7231.42 7170.88 29
8t00 7318.24 7257.70 30
8200 ........ 7404.2.8 ....... ?343.74 ....... 31
8300 7490.11 7429.57 30
8400 7576.10 7515.56
8500 7662,74~0 ................ 7601,86 ........ 30
8600 7749.01 7688.47 29
SPERRY-SUN WELL SURVEYING COMPANY PA2E $'
ANCHORAGE, ALASKA
...................... _: ...... , ...... DA T_E__O F__S U.a.V. E_Y__QE,C_~!,BE.B__2X~ :=! 9_81
COMPUTATION DATE BOSS GYROSCOPIC SURVEY
DECEMBER 22, 1981 JOB NUMBER EOSS-169~7
:. ' ' ' OPERATOR-THOMAS d HCGUIRE
C 0 U R S E CO U KS E.:],_,-- ...... D 0 G = LEG<L" :: _T_UA L .... -
IN.CLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL
DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION
52 S 39.30 E .22 .~.<~.":'I1'86.:71 S .' 1185'50 ~ 1663,43~
28 S 38.69 E .53 ~- 1229,80 S 1220,59 E 1718,86
39 S 38.89 E .67 1314.78 S 1289,33 E 1828.25
15 S 38.89 E .60 1357.11 S 1323.~8 E 1882.63
21 .: S:39,30 E. '<~.' :1392' 86 1992.71
52 S 39.80 E . 59~ ~ L::,:::1485. 32 "S ~ ~ 14'28.11 :E 20~8.0~
... 1 0 ... .... :L.~S~: 39~..8_9--E~ .......... ...,3-0~ Z8~~., ' ~ ~ 3 '9. 7, F ....... P ! ~95 .....
~0 S 39.64 E .52 1571.18 S 1499.66 E 2159.72
50 S 39.69 E .17 1613.97 S 1535.12 E 2215.26
37 S 39.39 E . 1637.~5'~E.~'::.:,:;~ ' 2376.56
. ...{ .. · ,
~0 S 39.30 E .5~ la18.79 S 1703.13 E 2~80.01
6 S 39. 0 a .58 [85B.02 S ~735.07 E 2530.6t:~
16 ...... .':~'S:?:38:':30; E : · 33:<~;~<-~/-.::',.;:~;~93~:..93 :S ;~..::~ 1796-:' 8677E?~>;;;::': 2629.2~
~ ....... S_ 3,8- 39_ ~,. · 7.9_--!-e~J~3,,~_S : _1,8_5_%,~~3_29_.. 8,L
44 S 37.69 E .46 2054,~0 S ~890.79 E 2781.13.
57 S ~6.59 E .67 2095.02 S ~92~.54 ~ 28~2.~5
55 S 35.10 E >' : 1980 37.E.'::>::~:.>::::' 2932.61
~. ~ ,:... ,.:, :,, ,..,:
8700 7855.25 7774
88.00 ........ 7920..59 ..... 7860
8900 .':'8006,~7 79~5
9000 8091.32 8030
...... 9!,0,0 ..........
9200 8257.64 8197.10
· 71 30 53 S 33.19 E ::' ~;"i:,< 11.37:..:.: :iii2218'40 .S'. :' 12008.77i<E<:!:,:'!?~!;:i:::2983.13
.35 ......16 ....... .$ ..... 32,1.o ii .... ao_36- i:!: .........
· 75 31 28 S 30,~9 E ,91 2306,37 S 2063,62 f 3086,31
· 78 31 58 S 28.50 E 1.12 2352.17 S 2089.~7 E 3138,36
33 4 8. .......$ .2_7_~9__E .... ~ . k,~ ..... ~_O_O~A_S 2_!!~ .91. E ..... 3 ~ 91~ 9_0 _
35 16 S 26'50 E < : S
~SO.H!O_ALASKA PET.ROLEUM COMPAN.Y.~ ........................................
~ E-20 (SEC 6 TllN RIOE) COMPUTATION DATE
' PRUDHOE BAY DECEMBER 22, 1981
_ A.. L_A._S..K.A ...........................................................................................
~PE'RRY'sUN .... WE~I~4~':'"'s-UR'V-E~'~;TN'-G CONPA.NY ': PAGE
ANCHORAGE, ALASKA:' ~ ~
~'~.-'~':..;.<. ~?;DATE OF SURVEY DECEMBER 21~ 1~81
....................... TRUE ......... SUB-SEA ..... COURSE ' COURSE DOG_LEG?i!.. i:i <i!~ ., TOTAL
MEASURED VERTICAL VERTICAL INCLINATION ...... ~I"RE~Ti'6N .... ~E'V~¥'Ty RECTANGULAR COORDINATES
·
DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST
BOSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-16947
KELLY BUSHING ELEVo = 60,54 FT,
<'< OPERATOR=THOMAS d.iMC6U!RE
VERTICAL
SECTION
9400
......... 95.00
9600 S 19,89 E
9700
...... 9.8 0.0
9900
10000
1_0.1~0.0 .......... 8956,24 ........... 8895,70 ...... . ~ ..41~ .~58 ...... ~.S_.~,..1.9 E
10265 9078,90 9018,36 41 58 S 19,19 E
8576,58 8516,04 37 57
8654,81 8594,27 39 ~
873_1,66 ............. 867.1.,12 ............. 40 ..... 28
8807,15 87q6,59 ~ 32
8881,81 8821.27 A1 49
2165,51 i:iE · .
2210 · 9.9 :~' :~-i: il~'' '~:
2673,81 S 2232,16 E
3363,24
3421,80
3480'230
S 18.50 E
S 1.7.,_60_ E
S 9.19 , E '
S '19,60 E
1,42 2732,62 S
1,50 279'3, ~+5 S
-. ~',3..!"~'; >< 2981 · ~ 1 S __
.00 ~085,~5 S
2252,63
2272,~4
2s
2373,72 E
3539.40
3599.69
3661,66
3724,84
3788,29
3893,03
HOR_I.Z.ONT..~AL__O.ISP_LACE.MEN~._: .... 3893,03 _FEE. T_..A!.__.$OUTH~ 37 DEG, 3~ MIN, EAST
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE~DIMENSIONAL?!RADIUS
AT MD = 10265
OF CuRVATUR:Ei! METHOD.
· :'
SOHIO kLASKA PETROLEUM. COMPANY
E-20 (SEC 6 TllN RI~E)
PRUDHOE BAY
.............. ~ ................. . i i . .
SPEPRY-SUN ~ELL SURVEYING coMPANY;: ' ~:" ' ~'" :' PAGE 5'
ANCHORAGE,~ ALASKA .
- ': :_.D_~_~._O.F__$_U_EV_EY_ D~.,_C_EMBER_21, _ 1~8~
COMPUTATION DATE
DECEMBER 22~ 1981
INTERPOLATED_VALUES
F 0 R E V E N .~ 1 0..0 0 ._E_E.E]'__O F-_.M_~:$_U~_ED._.D_~_T_H ..........
JOB NUMBER 80SS-169~7
K£_LL_Y__B_U.8_H_I_N_~.._[~L"' V., = 6QL_. 5 4 F T ~
.OPERATOR-THOMAS d MCGUIRE '
TRUE SUB-SEA
~_MEASUR. ED ..... VERT. I. CAL ....... V, ERTIC, A.L ...... RECTA
!DEPTH DEPTH DEPTH NORTH
{ ............... o ....... o.oo ........ . -eo. 4
iO00 999.91 939.S7 1
ooo iggg. lg g. i i
.... ~0,00 .......... 2998,78 ........... 2938..2~ .............. 2
~000 ~9~9,~5 ~858,8~ 25
5000 472~,55 ~664,01 67
......... 600.0 ....... 554.?...?e ............ 5q87.18 ............ 110
TOTAL
~ G UL A R.. _COO RDZNA~JE.S__ .... d~L -[I=_T_~D ..... V. EET_I.C_AL
/SOUTH EAST/WEST :i-DIFFERENCE. :. CORRECTION
O,lq S 5.72
0.07 S 16.08
2.55. S ......
9.35 S 315-96:
7000 638i.i0 6320.56 1528.27 S i463.97 E
8000 723i.42 7i70.~8 i93~.93 S 1796.86 E
........... ~000 .... 809.1..3~ ............803.0.78 .............. 2352.17..~S .......... ~O.~.~.~.7_E
10000 8881o81 8821.27 2918.~2 S ~ ~2315-25: E
10265,.- 9078.90 9018.36 ~085.6~ S..257~.72 'E
THE CALCULATION ~PRocEDuRES ARE"BASED ON
618.90
768.58
908.68
166.62
1~9.68
- - '-i~u.,~u :~.
209 · 51
1186.10""? '
':T"HE)~dS:E-'o:F'"-~-R-~*f'E-'~'Z-~ENS IONAL RADIUS OF
CURVATURE METHOD,
Z SpERRY-SUN ~ELL- SURVEYING COMPANy · PAGE 6
~ ANCHORAGE, ALASKA' "~: ~"'~ ' ·
·
!_SOHIO .ALASKA PETROLEUM . COMp. AN.Y .... "DATE OF SURVEY DECF-MBER 21, 1981-
) E-20 (SEC 6 T11N R14E) 'CO~1'PUT'A'TI'oDT-DX~rE
PRUDHOE BAY DECEMBER 22, 1981 JOB NUMBER BOSS-16947
FA-L.-A-SK---A- KELLY BUSHING ELEV, = 60,54 FT,
! . · ,..:.:.: : .i: "OPERATOR-THOMAS J MCGUIRE
TRUE SUB-SEA TOTAL
~_,M,E.A,SU~ ED. ......... ..V.E R T,!~,AL ............. ,v. ER T I,C,A~ ...... RECTANGULAR COORDINATES MD-TVD VERTICAL ....
I DEPTH ·DEPTH DEPTH N 0 R T H / S'O U~TH ~-~ '~iiETA~ T/W ES.T
60 60.5~ 0,00 ,00 S ,11 E ,00 ,00
160 160.5/~ 100.00 .09 S 1.15
260 _260.54 200'00 .51 S 2.00
360 360.54 300.00: 1.43 S' --'i~:' 112'69:
46o A6o.54 4oo'oo. 3.o s~I'~ .:~3~22
:3.65: E
3.8~ E
4.18 E
4,56 E
5.35: E
G.'!30 E
i
i .......... 560 ............. 560...5~ ............. 500...0 0 ........... 4.9~..S '
660 660.54 600.00 6.5~ S
760 760.54 700.00 7.98 S
, 8..6.0_ ......... 860_,.57 ................. 800.00 9.23 S
i 960 960.54 900.00 9.95. S '
~ 1060 1060,54~ .1000,00 10 44 S'
! ........... 116.0...'__.L1.1.60.~.54 1100,00 11.01 S : :: 7-33. E
1260 1260.54 1200.00 11.32 S "8.35 E
1360 1360.5~ 1.300.00 11.~2 S 9.21 E
1460 1460.5~ 1400.00 11 35 S 10 14 E
..... ........... '5 -,'S 4--' '" 5'o"o. o o s
i , i~60 i660.54 i600.0o ii.ii :s
L ...... ~ .... !..7_.6.0_ ....... 1.76.0._. 5.~. .......... 1Z.o..o..o.o. ............ i 0 ' 7_7.
.06
.08
.08
·
· 10 :>
.11
.11
.12
.01
.00
.00
SPERRY-SUN WELL
ANCHORAGEe ALASKA·
I~.SOHI,O,~AL,.AS.KA PETROLEUM COMPANY
E-20 (SEC 6 TllN Ri~E) COMPUTATION DATE
PRUDHOE BAY DECEMBER 22~, 1981
ALAS K A ................................................. '
'
PAGE
7
:
· .
JOB NUMBER B06S-169~7
· .
K~LJ._Y__B_U. SJ-L~G_, ELEV. = .Rq..B4 FT.
~ . ~' :~ :/::~:,': :OP ER A T 0 R -T H 0 M A S d',:. MCG U IR E
I N.T E R P 0 L A T ED, .V A L UES ,], E 0 R, EVE N ,100 .... E,EE I~.._O.F~..S~U~B..~.~~E~ .. :~.':.:;~;; ~;~ ~/'`
TRUE SUB-SEA TOTAL
F-MEA,S URED .......... VERTICAL .......... VE.R TI CA L_,_,REC T,A NG U L A R ...... ,CO 0 R,DiN KT_ES ...... M D_-_T_VJ3__ ......... V E~_T_I,C, AL
S 0 U T H E A S T / W ES T D I F. FER:EN CE!.::~:..::iiii:~ ::::. CO R R E C T I 0 N i::';"i'i! i; :i' ./:' ~
i DEPTH DEPTH DEPTH ' NORTH/
1960 1960.5~ 1900.00 10.18 S 15.82 E .15 .00
2060 2060,5~ 2000,00 9.90 S ~6.53 E .15 . .00
216.0 ........ 2.16~0,,5~ ................ 21,00.,00 .................9,70_.S ...... 17_,_7~__~ ...... :. ,~.6 ......... ,.01 . . .
2260 2260.5~ 2200.00 9.~0 S ~ :~:': I9'1:ZE ::~ ':' '~'
2560 2560.5~ 2500,00 ' 9,57 S :: :~ :: ~ 20,0~E ;,~ ;:'";~ ?; .01;'
2560 2560.5~ 2500.00 11.3~ S ~0.3~ E .19 .00
2660 2660,5~ 2600.00 11.96 S 20,46 E .19 .00
_2]60 .......... 2760.~5~ ........:..2700.0 0__ .... 12,69 S .......... 2.1..,1_3,~ ........ ,~ ...... .03
2860 2860,5~ 2800,00 [~.~7 S : 2~'53 E ~;.':?' ,08 '.-:: :.~::..::
.. . .
2961~ . 2960-5~ 2900,00
~0.62 ........... 306.0..5,~ .............. 3000..00
316~ 5160.5~ 3100.00
5267 ~260,5~ ~200,00
...... 5..512 .......... 336.0.,5~ ............ 3,500-00
5678 5~60.5~ ~00.00
5585 3560.52 5500.00
........ 66 .......... 560.0 ,oo
· . /
2.18
3.00
.&.,_4_~+
6. o 8
SPERRY-SUN W~LL SURVEYING' COMPANY
ANCHORAGE, ~ALASKAi ' ..... '
~:'. : .'-:: ~ iiDATE OF
i_S,OH~IO, ALASK. A PETROLEUM COMPANY ........ : .............. ~
E-20 (SEC 6.TllN R14E) COMPUTATION DATE
PRUDHOE BAY DECEMBER 22~ 1981
ALASKA
................................................ I.NT,ERPOLA.~ED.,.,¥.~LUES. FOR ,E~,EN 100 FEET' OF
SURVEY DECEMBER 21, 1981 -
dOB NUMBER BOSS-16947
KELLY BUSHING ELEV. = 60.54 FT.
. ~:. : : OPERAT.OR'.THOMAS-'!:UiiMCGUIRE
.., '.: i~ '/::i' ii.:i:,'.: /": .: ,,
SUB'SEA DEPTH . ·. :' ' ".'" :
TRUE SUB-SEA TOTAL
F.MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES
~-EP T H .............. DEpT-H ............ DE'pT'Hi! ........NoR~H/soU~'H ........ ~ EAST/WEST
i ........3_809 .............. 3.760,5~ ........... 3700,00 ................. 186
3927 3860.5q 3800.00 230.16 S 285.55 E
4051 3960.54 3900.00 280.68 S 338.18 E
4176 .......... ~..060,54 ........... 4000,00 332,85..S ............... 3.~3.1
~301 4160.5~ ~100.00 38~.63 S 446.21 E
i ~426 4260.5{ q200.O0 q36.27 S ,- 499.99 E
, ...... ~55.0 ............ ~3~0.54 .......... ~O0.O.O ......... 48s.i5 s ........... 55R...~9' E
~67~ ~460.54 4~00.00 559.S2 S 60~.88 E
~797 4560,54 4500,00 590,08 S 656,55 E
49[1 ~6.60,5..4 .......... 4600,0..0 ............... 641,27S 707,27
i 50~4 ~760,5~ ~700,00 692,76 S ........
~ 5167"- 4860,54 4800,00 744,39 S 806,83
L ....... 52~.9 ......... 4960,54 .......... 4900,00 ................... 795,68 .... s ............ 8.51~.,~1: E
5011 5060.5~ 50o0.00 e~7.~5 s 901.~1 E
5532 5160.54 5100.00 ~9~.22 S 947.15
565.3 .......... 5260,5~ ............ 5200,00 ........... 950,80...S ............ 99~,99
5774 5360,54 5300,00 1002,76 S 1035,06
i 5894 5460,5~ 5400,00 1054,67 S 10'77,~3. [
MD-TVD VERTICAL
67,10
90,89
116,04
18.9.~7
213.82
237.29
260,56
283.,.81
· .
$0~,62
:':328'. 70
18.48
23,79
25.15
2 ~... 8 0.:?:,'::ii: ?'
e ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
24
2.3.95
2;3.47
23.26
2 ,.3.2
22.81
22.09.'
f
350.53
-372.23
393.35
21,825
21,70
21.12
2 0 · 3 7":'_':::'::'':':>'':''':' .....
6015 5560.54 5500.00 1106.81 S 11-20.06 E
SOHIO ALASKA
E-20 (SEC 6
PRUDHOE BAY
· .A LA.S K ~
PETROLEUM
TI 1N RlqE)
COMPANY
SPERRY-SUN WELL SURVEYING COMPANY PAGE
ANCHORAGE, ALASKA
........................ DA.TE .... O.F_.S. URVF_Y_D.EC_EM~E_R_2Z.,_i_~81
CC¢,~PUTATION DATE
DECEMBER 22, 19A1 JOB NUMBER BOSS-16947
OPERATOR-THOmAS d MCGU~RE
INTERPOLATED VALUES FOR EVEN 100 FEET_ OF..SUB._-.S.~_....DER_T__H
TRUE
~MEASURED .... VERTICAL
DEPTH DEPTH
SUB-SEA TOTAL
.VERTICAL ..... RECTANGULAR . COORDINATES .......... MD.~_~.D ............... ~.EAT~CAI
DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
i~ 6136 5660
6256 ;760
6376 5860
...... 6495 ........ 5960
6615 6060
673~ 6160
.685~ 6260
6975 6360
7095 6~60
.... 7216_ 6560
7335 6660
7453 6760
7570. 6860
7687 6960
7803
7918 ....
8033
8149
........ 8265
· 54 5600.
.54 5700.
· 54 5800.
· 54 5900.
· 5~ 6000.
.54 6100.
· 54~ 6200.
· 54 6300.
· 54 6~00.
· 54 6500.
.54 6600.
· 54 6700.
· 54 6800.
· 54 6900.
7060.54 7000.
7160.54 7100.
7260,5~ 7200,
7360,5~ 7300.
7460,54 7400,
O0
O0
O0
O0
O0
O0
00.·
O0
O0
O0
O0
O0
O0
O0
O0
O0
O0
O0
O0
1159.17 S
1211.15 S
1262.58 S
1313,01 S
1365.51 S
141~.84 S
1465.89 S
1517,57
1569,37
1620,8~
1671.06
1719.91
1767,38
181~.90
i859.~1 S
1905,77 S
1947,73 S
1993,33 S
20~0,38 S
1162 · 95__ E ............. ~._7_5..,_69 . .
1205,4q E z~ 96, lZ~
12~6,85 E 515,96
1287, 90_F
1328,65 E 554.4&
1570,17 E 57~,29
1455.02 E 61~.,51
1498.15 E 655.21
1540.82_ E' .6_o_5...50__
1582.41 E 674.88
1621.99 E 693,01
1660,97..~E ................. 7.10,~7_
1699, 13 E 727,08
17~6,20 E 743,03
1772,05.._E ................ Z58,.i.6
1806,97 £ 772,84
1842.88 E 788.~6
20_,_7~
20,~5
19,83
L9_,29
19,21
19,83
20.52
20.60
20_..2__9_
19.38
18.13
1.7_...3.6 ..............
16,71
15,95
L5.~2
1~.68
15.63
1880.0~ .... E ............. 805..06 ...................... 1&.5_O
i sPERRy-SuN` WE'L~"S"ORVEY'INGi COMP!AN¥::~'.' :.: .:..: :' ::' ~' ~? PAGE 10
!..S,.QHI_Q..AL.A_SKA...PETROLEUM..CO.,M,PA_N~ .............. i.:~ .:i: i'.DATE'"OF SURVEY*DECEMBER ,21, 1981
~ E-20 (SEC 6 T11N RZqE) COMPUTATION DAT'E
PRUDHOE BAY DECEMBER 22, 198,1 dOB NUMBER BOSS-169q7
F_..A_L.~S_K_A,__ KELLY BUSHING ELEV. = 60.5/+ FT.
i . ' : ' 'i:':' "":/:!~ ~!::.:: ~;.; :!::':;:i: :' OPE R A T 0 R' T H 0 M A S.::,J ;;:.' M C GU I. R E
[.~L. ..................................... !,.N.TER.pOLATED' VALUES FOR EVEN` 1..oo...F,.EE.T_OF SUB-SEA:DEPTH
TRUE SUB-SEA TOTAL
,.ME A S UR E D_ ........... _,VE R T I C A L .......... _VE:R II C.AL ....... RE C T A NG ULA R ,_~.O. ORD !_N A.T ES
!-DEPTH DEPTH DEPTH
t
MD-T'VD' VERTICAL
.............. 8.381 .............. 7.56.0.5/+ ......... 7500.0
8q97 7660.5/+ 7600.0
8613 7760.5/+ 7700.0
__8729 ....... ~860..54, ......... 7.8.0.0-0
88q6 7960,5/+ 7900.0
8965 8060.5/+ 8000.0
........... 9082 ........... 8160
9203 8260
NORTH/SOUTH'.' : EAST/I4EST DIFFE:RENCE::::{?::::~.:::CORREPT'I.ON ....ii..?i;~ii.:i:i:!:..::i:i.:.;:::'.~.:·
2087,60 S ........ :.,..1.9~6,07 E : " 8..2. :...1'.!.3.? -.: :. ,:. __16,31
0 .......... 213q.9/+ S 1950-.'71 .... E 857.31
0 2181.93 S 1984.18 E 852.76
0 ................ 2231...06 .... $ .......... 2013~.05 E 868.93
0 2282.30'S. 20/+9.38 E ', ::;!::.i. 885'85.'. ' ..:
0 2,335.27 S 2080.30 E ::' ii!:i:i:7903":17 i'
:.. .:.~. ...,
0.0 ..00 ........ 91.371S 2,110 '"
8200.00 2452.52 S 21ql.51 E 9/+3.01
15
15
16
16
17
18
.9/+
.17
.55 : ?.?i.i~..~i':i:
21.29
9327
9/+53
9579
9707
9R37 ........
9o. 71
10105
....... 1.02qO .........
102,65
T H.E ..C A._L C UL
THE NEA
8360
8560
8660
8760
8860
8960
9060
9078.90
0 2518.71 S 2172.09 E 966.79
0 2589.55 S 2200.9/+ E 992.70
8500.00 2662.05 'S 2227.90 E :'
8600.00 2737.03 S 225/+.10 E ':.
8700.00 2816.93 S 2279.89 E ::..~-'1"0:'.7'7./+2: ~
· 5/+ 8300.0
· .5/+ ............. 8400 · 0
.54
.5/+
23
27
50
8800.00 2900.49 S 2.308.86 E 1110.92
8900.00 2985.06 S 23.58.70 E 11~5.24
9000.00 ........ L ............ 30.70,0.3 ._.S_ .......... 2368., 2.9..~E 1179.76
9018.36 3085.6.% S :12373.72 E $'1::0
ATION PROCEDURES USE'A
REST 20 FOOT MD (FROM CURVATURE) POINTS
RADI US OF
.78
.91
,50
,32
,52
Suggested form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
Operator, Well Name and Number
Reports and Materials to be received by: !- /~ Date
Required Date Received Remarks
Completion Report Yes /
Well History Yes /
,
_Samples
- ., ,
Core Chips m 0 ~ ~_
- .
Core Description ~ O~ ~
Registered Survey Plat 7 e~ /
. Inclination Survey /~ ~
·
I- /
~ Directional.. Survey. .~.~C=~, ~ -- P/
Drill Stem TeSt Reports ~. 0 ~, ~ ~/~.
production Test Reports ~ ~~ ~,_____~_.., ., , ~ ,.~
· Logs, Run. Yes / ~. )g_.g ~... ~, & ~_~?
Digitized Data ~ ~__~.~
·
BP EXPLORATION
BP Exploration (Alaska} Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 09/08/89
Transmittal: 80345
Prom:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
D-23 PROD-F 08/25/89
E-02 PROD-F 08/25/89
E-24 PROD-F 08/24/89
E-16 LEAK DETECTION 08/26/89
E-20 PROD-F 08/24/89
G-04 PROD-F 08/29/89
J-24 PITS 08/28/89
W-04 DTL 08/28/89
W-04 PROD-F 08/26/89
X-04 GAS LIFT 12/20/84
Sl
$1
$1
$1
$1
$1
$1
$3
$1
10150-10460 Camco 5"
9650-9939 Camco 5"
10350-10668 Camco 5"
5400-8300 Camco 2"/5"
9800-10145 Camco 2"/5"
10000-10308 Camco 5"
11200-11594 Camco 5"
11750-12197 Camco 5"
11750-12180 Camco 5"
2500-10053 Camco 1"/5"
DistribUtion:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
RESERVOIR
?ETA
ARCHIVES
Alaska Oil & Gas Co:s. Commiss o,?
Anch0ra~e
SOHIO RESTRICTED
SOHIo ALASKA PETRoLEuM COMpANy
;
TO:
31 ] 1 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907J 265-0000
MAIL: POUCH 6-6 ~ 2
ANGHORAGE, ALASKA 99502
Date: 1111/82
STATE: 1111/82
The foIlo~'ZO FINAL ~." "~ ~ _
W,ng mater,al ,s beinb"~ubm?t~.~ ~ 20
copy of ~u nerewith. Please acknowledge receipt by Signing a
this letter and returning it to this office:_
OPEN HOLE FINAL
E-20 DIL/SFL
E-20 LOGS
' BHCS
-~0 FDC " ,i 12/8/81 & 12/12/81
FDC/CNL ,; 12/12/81 ¥/l& 2
........ . ,, 12/12/81 //2
'- 12/12/81
STATE ONLy: ....... .. .,~
'~- '- . ................ //2
E-20 DIRECTIONAL SURVEYs.
E-20 Magnetic Single Shot Survey
GYroscopic Survey 11/29-12/8/81
12/21/81
.,
5"
Jo b ~~Al 281- 008
ao / 69 7
~9
CommlsSlOrl
Al3ska 0il & Gas Cons.
Anchorage
De V
~~. Ceolo~y
Well
yrds '
SOHIOALASK~~ EIROLEUM COMPANY
SOHI0 RESTRICTED -
3111 "C"STREET
ANCHORAGE. ALASKA
TELEPHONE(907) 265-O000
TOt.
·
ARCO
EXXON
PHILLIPS
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 9950:~
Date:. 1/14/~ 1320
Page 1 of 2
* A-19 V/ '(Sch) '-
* B-.8 -'.9, CH-CNL t/62356
* D-1 " CH-CNL t/62436
* D-3 ~'"" " CH-CNL #62367
* n-4 ~// " CN-CNL #62437
* E-20~ " OH-DIL/BHC/FDC/CNL t/62366
* E-21 " OH-DIL/BHC/FDC/CNL #62332
* F-2/ " CH-CNL t/62440
*'F-16 ~'/ " OH-DIL/BHC~FDC/CNL #62423
* J-l~/ " CH-CNL t/62433
* ~-5~ " CH-CNL #62427
* J-8 "
/ CH-CNL #62430
* M-13~ " CH_TDT. #62455
* M-14 v' " CH-T.DT #62454
SFO '
REFERENCE:
/~ SOHIO MAGNETIC LIS. TAPES & LIST.IN__G_S'
The followin§ material is being submitted herewith. Please acknowledge receipt by signing a
cody of this letter and returning it to this office:-
SOHIO MAGNETIC LIS TAPES AND LISTINGS ON THE FOLLOWING WELLS:
OH-'DIL/BHC/FDC/CNL~' #62422 ;' ', '"
i2/2i/8i
i2/2i/8i
i2/26/81
i2/ii/Si
12/27/81
12/12/81
11/19/81
12/23/81
12/22/81
12/22/81
12/19/81
12/20/81
12/31/81
12/29/81
(con' t) ' ~ '
.-- r
JAN 1 5 1982
DATE 19
Carol KraZy
Developm
Alaska0il & Gas Cons. Commission Well Reco 4-5
Anch0ragm
Thru:
ALASKA OIL AND GAS CONSERVATION COMMISSION
Hoyle H. Hamilton/~
Chaiman
Commissioner
Doug Amos
Petroleum Inspector
December 16, 1981
Witness mOPE Test at
Sohio ' s E-2_~el 1
seC~ 6'~;~T11N, R14E, U.P.M.
Permit No. 81-39 on
Nabors Rig No. 22E
Monday November 30, 1981 - I traveled this date from Shell's West
MikkelSen' unit' %~3 weii-~° $ohio's E-20 well to witness the mOPE
test. The test commenced at 12:30 p.m. and was concluded at 7~30
p.m. There were no failures and I filled out an A.O.G.C.C. mOPE
test report which is attached.
In summary I witnessed the successful mOPE test on Sohio's E-20
well. I filled out an A.O.G.C.C. mOPE test report which is
attached.
4/8o ' .
.ALASYJ~ OIL & GAS CC):''i:~WATION COMMISSION -' B.O.P.E. Inspection Report
·
Inspector
Operator
Representative
·
Well ~-~0 Permit ~
.% -
Location: Sec ~ T II~ RI~-ti ~ ~ l~asing Set 0 ~~' ft.
Drilling Contractor ~~~ Rig ~ ~Representativa~~/~
............................
Location, General
Well Sign
General Housekeeping
Reserve pit
Rig .
BOPE Stack
Pipe Rams //
Blind Rams.,~ ~ /
Choke Line Valves j l .,~
I
H.C.R. Valve ,, j ~,z , / J
Kill Line Valves
.Check Valve ~' / ~ '.___.
Test Results: Failures
Tea t PresSnare
/
·
ACCiJtlU IJV!'OR SYSTEH
Full Charge Pressure ,~L~f%L-~ psig
Pressure After Closure. /~J) psig
200 psig Above Precharge Attained: rain /~sec
Full Charge Pressure Attained: / rain,sec
Controls: Nas~e~ ~.
Remote O~ B~nds sw~ch cover ~
Kelly_ and FloOr Safety Valves:
/'~Tes t.. Pressure~
~st Pressure
Test Pressure
upper Keliy
Lower Kelly.
Bal 1 Type
Inside BOP /
Choke ' Manifold
.No. Valves
Test Pressure ..........
/ Test Pr~su~'e
N'0. flanges
Adjustable Chokes
llydrauically operated choke_ ,
......... :: : ::.- ~ . ._:.zz;~;_-z., ~ ..... o r _z_~: .... - .............. - ---- ......
~ Test Time --7 ' hrs. (~,'i"~ .,
.... days and
Repair or Replacement of failed equipment to be made within
·
Inspector/Commission office notified.
!'.
111
Distribution
orig.- - AC&GCC
cc - Operator
cc - Supervisor
Inspector.
ALASKA OIL ~D GAS CONSERVATION COMMISSION
Hamilt ~o
Hoyle H.
Chairman ~f~/...
THRU :Lonnie C. Smith
Commissioner
.
Bobby Foster i j~<~ ~ '.
·
Petroleum Inspector
December 7, 1981
Witness Retest of BOPE
8~ on Sohio'_.~_.E.2_0 ~
Sec. 6 TllN,R14E, UPM
Permit %81-39
Wednesday, December 2, 1981: While standing by to witness the
BOPE test on Arco's DS 15-14', Bill steuble, Sohio drilling foreman,
contacted me and said he w~ ready'tO retest., the BOPE stack.
The stack was tested, 12/1/81 by Doug Amos, .but was nippled down to
perform another cement job~0n the 13 3/8 casing.. Apparently £he float
collar h.ad plugged during ~he first Cement job'and according to the
calculations made by Doweil and sohi0..rep~esentatives, 290 bbls. of
cement had cleared the sh0e~." After nippling up the BOPE stack an4
starting in the hole, gree~Cem~t'was enc0~tered,' ~The.cement was
washed and drilled out tO ~h~ ki6At 601iA~. A st~in tool was run
after nippling down the ~Q~ ~Ck, stabbed in to the collar and
another cement ]ob was ~~ B%l!~ said good cement returns were
received at surface.
In summary, I witnessed th~ retest of the BOPE~stack only on
Sohio ' s E- 20.
BF .. vdl ':
i?,..!,:: i:? STi,'r,.: ".':'";,~.^S}:a " '
"A~SKA OIL & GAS. CO~i:[ERVA_TIOIi COMMISSION
":""¢?"::"?:~ B.O.P.E. InspectiOn' Report
L°c~tion, 'General
Welt Sign
General Housekeeping ~,(~.
'Reserve' pi t
Check Valve
BOPE Stack
Annular Preventer
Pipe Rams
Blind' Ram's
Choke Line Valves
H.C.R. Valve
Kill Line Valves.,
Test Results: Failures
Repair or Replace!.nent of
Test Pressure
. .
Date /~___C7 _~. __ f9/
R epr'~ntative -/'~,'!i
Permit" ~/ -- ~g
.
/3~asing Set ~&'~¢~ ft
Represents. tive .
ACCU:IU]~,TOR SYSTEM
ps ig
Pressure After Closure psig
200 psig Above Precharge Attained: min
Full Charge Pressure Attained: min
Controls: Master
'Remote
Blinds switch cover
~/
Test Pressure
Test Pressure
Test Pressure
Test Pres sure
Test Pressure
Kellv. and Floor' Safe_tv Valves
Upper Kelly.
Lower Kelly
Bal 1 Type
Ins ide BOP
Choke Manifold
Mo. Valves
No. flanges
I Adjustable 'Chokes.
__t J.' ~ ~u'~ c~, ~ ~ ~ o?f ~!t_,f.~...ch_.o_~A ....
- .-ur ._- :-=_- .......
Test Time hrs.
fail. ed equipment to be made within, days and
Inspector/Commission office notified. '
Remarks: '7~'/. ~ ~ ~---- , './iFil d ~.:.'",cT ~..J /c'.D/Cfc.2_/.'y/r/~Z'-.'~r~.,,x,~,il~,
~ ' · .... ""~. ' ..--/ .~--..-,:..x x...,,?.~: ' ...J,..::,, ,,J
,". " : ' .
Distribution
orig] - AO&GCC
cc ,- Operator
cc - Supervisor Inspector ~.~
· /
4
November 13, 1981
Mr. R. H. Reiley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Res Prudhoe Bay Unit E-20
Sohio Alaska Petroleum Company
Permit NO. 81-39
Sur. LOC.~ 1743~SNL, 883~WEL, Sec 6, TllN, R14E, UPM.
( CORRECTED )
Bottomhole LOC. l 725~NSL, 1663~EWL, Sec 5, TIIN, R14E, UPM.
( CORRECTED )
Dear Mr. Reiley~
Enclosed is *the approved revised application for permit, to
drill the above referenced well.
The provisions of the cover letter, dated March 23, 1981,
accompanying the original approved permit .are in effect for
this revi sion.
Very truly yours,
~oyl"~ .~. H~ilton
Chairman of
A~s.~ Oil & Gas Conser~tion Co~ission
Enclosure
cc~ Department of Fish & Game, Habitat section w/o encl.
Department of Environmental Conservation w/o/encl.
aha
SOHIO ALASKA PETROLEUM COMPANY
November 6, 1981
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907; 276-511'1
MAIL: POUCH 6-6~i2
ANCHORAGE. ALASKA 99502
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well E-20 (24-05-11-14)
(Permit #81-39)
Enclosed, in triplicate, is Form 10-401, Permit to Drill
(Revised), for the above-named well. This revision shows
the newtarget and bottomhole locations.
Also enclosed are the revised program outline and revised
surveyor's plat.
If you have any questions, please call me at 263-5183 or
Ted Stagg at 263-5173.
Yours very truly,
RHR: ja
District Drilling Engineer
Enclosures
cc: Well File #17
RECEIVED
NOV ~'~ 9 l~ltl
A~ask~ 0il & Gas Cons. Commission
Anchorage
[ STATE OF ALASKA ~,".
ALASKA ,L AND GAS CONSERVATION C ,MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work. DRILL [] lb. Type of well EXPLORATORY I'-1 SERVICE [] STRATIGRAPHIC []
REDRILL [] DEVELOPMENT OIL~ SINGLE ZONERS]
DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE []
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of well at surface 9. Unit or lease name
1743' SNL, 883' WEL, Sec. 06, TllN, R14E, UPM Prudhoe Bay Unit
At top of proposed producing interval (target) 10. Well number
850' NSL, 1550' EWL, Sec. 05, TllN, R14E, UPM (Corrected) E-20 (24-05-11-14)
At total depth 11. Field and pool
725' NSL, 1663' EWL, Sec. 0.5, TllN, R14E, UPM (Corrected) Prudhoe Bay
5. Elevation in feet (indicate KB, DF etc.)~ 6. Lease designation and serial no, Prudhoe Oil Pool
Est. KBE = 60 '_ AMSL ADL 28304
12. Bond information (see 20 AAC 25.025)
Type Blanket Surety and/or number Sa5eco ];ns. 2975387 AmOunt $200,000.00
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed
N-W o~: Deadhorse l0 miles ~d~)L 28_30.3 3617 feet well ~,-5 2070 feet.,
16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
10230'MD 9110'TVD feet 2469 November 22, 1981
,
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures .3.3.30 psig@ Surface
KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 34 °l(see 20 AAC 25.035 (c) (2) . 4390 psig@ 8800ft. ~ (TVDkc, .
21
Proposed Casing, Liner and Cementing Program
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
36" 20X30 Insula':ed Con(luctor 110' Surface 110'I 110' 8 cu.yds, conCrete
17 1/2 13 3/8 72# L'80 BUtt. 2680' Sur~ace 2680'~1 2680' 3720 cu.ft. Arcticsetl
12 1/4 9 5/8 479 L-80 Butt. 9290' Surf~ace 9290'1 8330' 1300 cu.ft, class'G';
i I 130 cu. ft. ArCticset
8 1/2 7 26# L-80 IJ4S 1440' 8790' ~, 7916' 10230'11 9110' 355 cu. ft. Class' G
22~ Describe proposed program: W/18% salt
See attached proposed drilling program outline.
RECEIVED
NOV 0 9 1981
;Alaska Oil & Gas Cons. Commission
Anchorage
23. I hereby certify that the foregoing is true and cor~.ct to the best of my knowledge
'7,
The space below for Commission use a. H. Reiley
CONDITIONS OF APPROVAL
Samples required Mud log required I Directional Survey required I APl number
r-lyES Q~No []YES ~,.O RES I-lNGI 50- 0
Permit number Approval date
~¢/_j ~ .~c-,~J-~/ I SEE COVER LETTER FOR OTHER REQUIREMENTS
~,~~~~ ~ ,COMMISSIONER DATE
APPROVED
BY
I · '
by order of the Commission
Form 10-401 Submit in triplicate
Rev. 7-1-80
PROPOSED DRILL~ AND (//4PLETION PRDGRAM
WE~Z. E-20 (24-05-11-14)
Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated
conductor to surface using 8 cu.yds, concrete.
Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to
surface using 3720 cu. ft. Arcticset II cement.
Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind
rams, and annular preventer from 13 3/8" casing point to T.D. Maximum
possible bottomhole pressure is 4390 psi at 8800' TVDss based on original
reservoir pressure. Maximum possible surface pressure is 3330 psi based on
a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss.
Directionally drill 12 1/4" hole to 8330' TVD. Run 9 5/8" 47# L-80 But-
tress casing to 8330'TVD and cement first stage with 1300 cu.ft. Class G
cement. Cement second stage through D.V. packer collar at 2600' with 130
cu. ft. Arcticset I cement. 9 5/8" casing will be hung at surface; the
9 5/8" x 13 3/8" annulus will be Arctic Packed.
Drill 8 1/2" hole to T.D. at 9110' TVD. Cement 7" liner to 500' inside
9 5/8" casing shoe with 355 cu. ft. Class G cement with 18% salt.
Run 4 1/2" 12.6# L-80 A/B mod. Buttress IPC tubing with'~gas lift mand-
rels and a production packer assembly at 7875' TVD. A subsurface safety
valve with dual control lines will be placed at 2100'. Displace tubing
to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of
proposed perforations to be submitted on Sundry Notice to follow.
NOV 0 9 ]98]
Alaska Oil & Gas Cons. Commission
Anchorage
TRIPLE RAM
5000 PSI WP
DRILLING
KILL LINE
ANNULAR
PREYENTE
,I
CH ECX: GATE GATE
I
PIPE RAMS
I I
BLIND RAMS
DRILLING
SPOOL
PIPE RAMS
I I
CHOKE LINE
GATE HYDR. ASST.
GATE
NOV 0 9 1,98T~.
Oil A Gas CoDs,
ADchora~je
L._ 4109'
I
I
~ , ~3~Y LA~ : 70°20 8
; ':~ ' ~ t652' , ' J o ,2 · ,,
aa : _ I - I ' ~ ~ /E Y :5,~,'6,164
~ 6 I ~1 '' ~1 - ~[ ' I
~ ..................... :-~-~t'~ "-"z>-[~;~"~, ~ I
03 ' ~
' ' ~-/~ !
~1 ~ - ~~,o ~-/~ I
04 ~
I hereby certify that I am properly registered and
licensed to practice land surveying in the State of Alaska and
that this plat represents a location survey made by me or
under my suDervision, and that all dimensions and other
details are correct.
h295 --~180 -~
NE COR. PAD
,1/'[44.05-//.
,laf'AZ. 07-//-/4)
CAMP
3001 ~.. ! ~. ,,4e5. 5 '
_PAD DETAIL
Scale I" = 500'-
PORTION OF T. IIN.~R. 1:5 6 14 E.
sca~el":~/2 Mile T. 12N, R. 1581 14 E
_l '
~ '~, -- V~'~-z..
Date
SURVEYOR
REMOVED (PROPOSED) BHL E-:)2 (REVISED TO PROPOSED BHL E-15).
REVISED (PROPOSED) E-18 & E-19 LOCATION
ADDED ACTUAL E-16,8800' SUB SEA.
ADDED (PROPOSED) E-18 & E-22 BHL; REV.(PROPOSED) E-17 & E-21 BHL
ADDED (PROPOSED) ~-21 BHL
ADDED (PROPOSED) -20 BNL
ADDED (PROPOSED) E - 19 BHL
ADDED PAD EXTEN810N 8W COR. TO. PLAT
ADDED PAD EXTEN$10N TO PLAT
ADDED(PROPOSED)E-17 BHL (FORMERLY PROPOSED E-ID BHL)
ADDED (PROPOSED) E- 16
ADDED ACTUA_ E-6 8800' SUB SEA
ADDED ACTUAL E-5, E-4 ~E-5 8800' SUB SEA
ADDED E-6 (PROPOSED) 8800' SUB SEA
ADOE D E- ;' (ACTUAL) 8800' SUB SEA 8 ADDED E- 5 (PROPOSED) 8800' SUr:~ ~,~. A
ADDED E- 4 ( PROPOSED )
REVISED E-3(PROPOSED)8 WELL HOLE NUMBERS
REVISED WELL HOLE NUMBERS
REVISED (PROPOSED) E- 3 LOCATION
ADDED (PROPOSED) E~4
REVISED E-I AND ADDED (PROPOSED}
TOP SADLEROCHIT (PROPOSED) E-I,E-2 8800'SUB-SEA ELE¥.
9/23/81
9/I /81
7/IS/8 I
7/.15/.81
3110/8 I
S/3/81
$/3/81
I/s/el
I1 5 I81
4/22/80
.~ ';4/?6
.). 'L',.' ' 75
~'~ 2 7'5
~.'24 . 5
P.J.R.
P. J.R.
P.J.R.
P.d.R.
D. H.O.
D. HO.
P. J.R.
P. J.R.
P.d.R.
C.J.R.
C.J.R.
C.F.G.
C.J.R.
3. J_r
Cji.
c J R
'JR.
CJR
3 ,, R.
C.J.R.
PAD"E"
Located in
YE: I/4 PROT. SECTION 6~ T. IIN.~RI4E. UMIAT MERIDIANI ALASKA
Surveyed for
B P ALASKA INC.
Surveyed by
F M. LINDSEY t~ ASsoc.
LAND "B HYDRoGRAPHiC SURvEYo'R$
2502 West Northern Lights Boulevard Box 4-.081
Anchorage Alaska
E-6 4s~d..rvp
£-2o 3~
WELL
1"= I00~
£-z 4
E-'3..o ~5 ~o'?vo t
March 23, 1981
Mr. R. ~. Reiley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Re: Prudhoe Bay Unit E-20
Sohio Alaska Petroleum Company
Permit No. 81-39
Sur. Loc.: 1743'SNL, 883'WEL, Sec 6, TllN, R14E, UPM.
Bottomhole Loc.: 122'NSL, 1298'EWL, Sec 5, TllN, R14E, UPM.
Dear Mr. Reiley:
Enclosed is the approved application for permit to drill the
above referenced well.
well samples and a mud log are not required. A directional
survey is required. If available, a tape containing the
digitized log information shall be submitted on all logs for
copying except experimental logs, velocity surveys and dipmeter
surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to AS
16.50.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations
you may be contacted by the Habitat Coordinator's office,
Department of Fish and C~me.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
Mr. R. H. Re iley
Prudhoe Bay Unit E-20
-2-
March 23, 1981
com~ncing operations you may be contacted by a representative
of the Department of Environmenta! Conservation.
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 hours after the well is
spudded. We would also like to be notified so that a repre-
sentativ~ of the commis.sion may be present to witness testing
of blowout preventer equipment before surface casing shoe is
dri 1 led.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
Very truly yours,
~. Hamilton
Chairman of BY ORDER OE THE
Alaska Oil & Gas ConservatiOn Commission
Enclosure
cc~ Department of Fish & C~ame, Habitat Section w/o eric1.
Department of Environmental Conservation w/o/encl.
SOHIO ALASKA PETROLEUM COMPANY
March 17, 1981
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAG E, ALASKA 99502
CONFIDENTIAL
Alaska Oil & Gas Conservation Conmnission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well E-20 (14-05-11-14)
Enclosed are the following documents, in triplicate, along with
our check'for $100.00 to cover permit filing fees.
1. Application for Permit to Drill,
2. Proposed Drilling Program Outline,
3. Blowout Prevention Equipment Diagram,
4. Surveyor's plat showing well location,
5. Directional plan.
RHR:ja
Enclosures
cc: Well File ~17
Yours very truly,
~/R. H. Reiley
District Drilling Engineer
RECEIVED
! 9 1 8.1
STATE OF ALASKA
ALASKA (~ AND GAS CONSERVATION COI~i~,ISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL
REDRILL
DEEPEN
lb. Type of well
EXPLORATORY [-]
DEVELOPMENT OIL I~
DEVELOPMENT GAS []
SERVICE [] STRATIGRAPHIC []
SINGLE ZONE [~
MULTIPLE ZONE []
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of well at sUrface
1743' SNL, 883' WEL, Sec.06, TllN, R14E, UPM
At top of proposed producing interval
370' NSL, 1140' EWL, Sec. 05, TllN, R14E, ~
At total depth
122' NSL, 1298' ~EWL, Sec. 05, TllN, R14E, UPM
5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no.
KB~ 65' AMSL I ADL 28304
9. Unit or le.~se name
Prud~e Bay Unit
10. Well number
E-20 (14-05-11-14)
11. Field and pool
Prudhoe Bay
Prudhoe Oil Pool
12. Bond B (see 20 25.025)
information AAC
Type la~ket Surety and/or number Safeco Ins. 2975387 Amount $200,000o00
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed.
N~ Deadhorse 10 miles ADL 28303 3982 feet well ,:E~.5 2716 feet
16. Proposed depth (MD & TVD)
10520' MD 9290' TVD
feet
17. Number of acres in lease
2469
19. If deviated (see 20 AAC 25.050) [ 20. Anticipated pressures
KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 35.1q (see 20 AAC 25.035 (c) (2)
18. Approximate spud date
May 18, 1981
3330 psig@~ Surface
4390 , psig@ 8800 ft.~ {TVD)
Proposed Casing, Liner and Cementing Program
SIZE
Hole I Casing
36" [30x20
17 1/q 13 3/[
12 1/~ 9 5/[ 47%
8 1/2'1 7" ,29%
22. Describe proposed program:
-,
CASING AND LINER
Weight Grade I Coupling ] Length
Insulab .,d Condgctor [110
L-SO { Butt.I 2680
72% Butt. 9575
L-80 / Butt.I 1445
MD TOP
SurfaCe
SurfaCe
Surface
I
SETTING DEPTH
I
9075 18100
TVD
See attached proposed drilling program outline.
MD BOTTOM TVD
110 ~110
!2 80
9575 118510
I
,/0520 119290
QUANTITY OF CEMENT
(include stage data)
8 Cu.ydS.
3720 cu. ft,
1345 cu.
130 cu.ft. Arctic Set
275 cu.ft. Class G
RECEIVED
MAR 1 9 1981
Alaska 0ii & Gas Cons. Commission
Anchorage
~orrect to the best of my knowledge
23. I hereby ~ertify that the foregoi
SIGNED (~J~- ~'"' \ ~L ~C~ TITLE District Drilling Engined~LATE
The space below for Commission use
CONDITIONS OF APPROVAL
APl number'
Samples required
[]YES ~NO
Permit number
APPROVED BY
Mud log required
DYES .[~'N O
Approval date
03/23/81
Directional Survey required
J~YES i-]NO
50- O'~ - ~o S~7G
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMM ISSl ON ER DATE
by order of the Commission
lVh~'~.h 23¢ l qR1 _
Form 10~,01 Submit in triplicate
Rev. 7-1-80
p~~D DRILLING AND CCMPLETION P~.
WELL E-20 (14-05-11-14)
Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated
conductor to surface using 8 cu. yds. concrete.
Drill 17 1/2" hole to 2700'and cement 13 3/8" 72# L-80 Buttress casing to
surface using 3720 cu. ft. Arctic Set II cement.
Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer from 13 3/8" casing point to T.D. Maximum possible
bottomhole pressure is 4390 psi at 8800' TVDss (based on original reservoir
pressure). Maximum possible surface pressure is 3330 psi based on a gas
column to surface from 8600 'TVDss and an oil column to 8800' TVD.
Directionally drill 12 1/4" hole to 8510'TVD. Run 9 5/8" 47# L-80 Buttress casing
to 8510 'TVD and cement first stage with 1345 cu. ft. cement. Cement second stage
through D.V. packer collar at 2600'+ with 130 cu. ft. Arctic Set I cement. 9 5/8"
casing will be hung at surface, the-9 5/8" x 13 3/8" annulus will be Arctic Packed.
Drill 8 1/2" hole to T.D. at 9290' TVD. Cement 7" liner to 500' inside 9 5/8" casing
shoe with 275 cu. ft. Class G cement with 18% salt.
Run 5 1/2" 17~ IJ4S IPC tubing with gas-lift mandrels and a production packer~ assem-
bly at 8060' TVD. A subsurface safety valve with dual control lines will be placed
at 2100 ft. Displace tubing to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of proposed per-
forations to be submitted on Sundry Notice to follow.
B.O.P. STACK CONFIGURATION
1:5 /8" TRIPLE RAM ST(~
--
5000 PSI WP
DRILLING
ANNULAR
PREVENTER
PIPE RAMS
CHECK
KILL
HAND
GATE
LINE
GATE
BLIND RAMS
DRILLING
SPOOL
HAND
GATE
HYDR. ASST.
GATE
PIPE RAMS
i_
04
O2
fl4 .
NE; COR. PAD
I1' [ ~I~1- O,f - II- 14)
L CAMP
:300' _ 1__ 485.5' 4
PAD DETAIL-
_
Scale I" = 500'
PORTION OF T. IIN.~ R. 1:5 8 14 E.
Sca~el"=~/2 MUe T. 12N, R. 1:5 8 14 E
I hereby certify that I am properly registered and
licensed to practice land' surveying in the State of Alaska and
that this plat represents o location survey made by me or
under my suRervision~ and that all dimensions and othej~,~
details are correct.
,
Dele SURVEYOR
A- 12363 - 81
PAD"E"
Located in
Surveyed for
B P ALASKA INC.
M.L
ADDED (PROPOSED) E-20 BHL
ADDED (PROPOSED) E- I~ BHL
ADDED PAD EXTENSION SW COR.TO.PLAT
ADDED PAD EXTENSION TO PLAT
ADDED (PROPOSED)E- 17 BHL (FORMERLY PROPOSED E-ID BHL)
ADDED (PROPOSED) E - 16
ADDED ACTUAL E-6 8800' SUB SEA
ADDED ACTUAL E-3, E-4 ~E-5 8800' SUB SEA
ADDED E-6 (PROPOSED) 8800' SUB SEA
ADDED E-2 (ACTUAL) 8800' SUB SEA 6 ADDED E-5(PROPOSED) 880~J' SU[~ qt A
ADDED E-4 (PROPOSED)
REVISED E-3(PROPOSED) 8~ WELL HOLt[ NUMBERS
RE.VISED WELL HOLE NUMBERS
REVISED (PROPOSED) E-:5 LOCATION
ADDED (PROPOSED) E-4
REVISED E-I AND ADDED (PROPOSED) 1[-5
TOP SADLEROCHIT (PROPOSED) E-I~E-2 8800'SUB-SEA EI_F,.~.
3/10/81
3/3/81 D, H.O.
$/3/81 D.H.O.
/81 P.J.R.
4/22/80 P,J,R.
4/ 6 '76 C.J.R.
F 'Z4/76 CJ.R.
I / 3/76 C.F.G.
I_~/ 2 '75 C.J.R
I~. '.,'?S ;.J,R
~,,'~4 75 C d
.).'~,2' 75 C. J R
I., ~;,','~ 'J R,
t.,~ 3 75 C j R
Surveyed by
EM. LINDSEY & ASSOC,
LAND ~ HYDROGRAPHIC SURvEYO'R$
~,'24 ,5 ~ ,' R,
' ~ ~5 C.J.R,
2502 West Northern Lights Boulevard
Anchoroge
Box 4-081
Alaska
·
~'-2. O 7'1/~> ,
.o
._
VV/~. &.L. ~
]7~-S' ' 9-V'D
TVD 3766'
F-18
'TvD ~r3 78'
E-7 TVD
"7 ~
~ EZ°
I
CHECK LIST FOR NEW WELL PERMITS
I~ase & Well No.
ITDM APPROVE DATE
(1) Fee ('~ '~ -! ~--~'/ _
,/
(2) Loc. ~..~ "J,~t~, ~!
(3) Admin ~~
(ge u 11)
e
10.
11.
YES NO
1. Is the permit fee at~ached .........................................
2. Is ~11 to be located in a dmfined pool .............................
3. Is ~11 located proper distance frcm property line .................. .<~
4. Is v~ll located proper distance from other ~lls ....................
5. Is sufficient undedioated acreag~ a~ilable in this pool ....... - .....
6. Is V~ll to be dmviated and is ~11 bore plat includmd ...............
7. Is operator the only affected ~arty .................................
8. Can permit be approved before ten-day mit .......................... ~-~
Does operator have a bond in force ..................................
Is a conservation ordmr needed .....................................
Is administrative approval needed ...................................
(12 thru 2b)' ~ 13.
14.
15.
16.
17.
18.
19.
20.
(21 thrd 24) ~- 22.
, ~" 23.
24.
25.
Is conductor string provided ........................................ ~
Is enough cement used to circulate on conductor and surface ......
Will cement tie in surface and intermediate or productiOn strings __
Will cement cou~r all known productive horizons ................... ' ~__
Will surface c~sing protect fresh ~ater zones ....................... ~
Will all casing give adequate safety in collapse, tension and burst.. ~ . ,,
,
Is this roll to be kicked off from an exiating mllbore ............. ,
Is old mllbore at~ndonmnt procedure included on 10-403 .............
Is adeqmte roll bore separation proposed ........................... ~,~,
·
Is a dimrter system required .......... , ......................... ,... ~
Are necessary diagrams of diverter and BOP equipment attached ....... ~ .....
Does BOPE have sufficient pressure rating - Test to ~o psig .. ~
Does the choke manifold comply w/API RP-53 (Feb. 78)'...., ............ __ A~ ~
.
Additional requiren~nts .............................................
Additional Remarks:
, ology:
rev: 03/10/81
..... INITIAL ': GEO. UNIT' iON/OFF
POOL CLn~S STATUS AREA NO. SHORE
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No.
ITEM APPROVE DATE
(1) Fee -/~. //- ~f!
~-~t
(~ thru
1. Is the permit fee attached ............................
2. Is well to be located in a defined pool ........... '' '' '
3. Is well located proper distance from property line
4. Is well located proper distance from other wells'..
5. Is sufficient undedicated acreage available in this
6. Is well to be deviated and is well bore plat included ..
7. Is operator the only affected party ......... ..........1''1''' '
8. Can permit be approved before ten-day wait ..'''''''''.'."' '.'
(3) Admin~~' // ~'f! 9.
(~ thru 11) 10.
11.
Casg~~ //-?~ ~/
thru 20)
(5) BOPE (~~
~21 thru 24)
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
(6) Add:
eee
·
·
·
Does operator have a bond in force .................................. (
Is a conservation order needed ...................................... /
Is administrative approval needed ...................................
YES NO REMARKS
Is conductor string provided ................... ' .............
Is enough cement used to circulate on conductor and surface .
Will cement tie in surface and intermediate or production str
Wil
Wil
Wil
IS
Is
Is
1 cement cov~er all known productive horizons ........ ...
·
1 surfa'ce casing protect fresh water zones .. '~... '.'
1 all casing give adequate safety in collapse, tension and
this well to be kicked off from an existing wellbore .....
old wellbore abandonment procedure included on 10-403 ....
adequate well bore separation proposed ...................
ings
burst
eeeleeee ,,, ~
eeeeel·e
Is a diverter system required ................... .~_p__ ~~-~ . c/-zo-%/
Are necessary diagrams of diverter ~g~ ~ eqglp g ; ...... ~
Does BOPE have sufficient pressure rating - Test to ~o psig .<~ _
Does the choke manifold comply w/API RP-53 (Feb.78) .................. , .... ~o~~:r~<~T~
Additional requi-rement s
Additional Remarks:
Geology:
' -- LCS. ~'BEW ~
~~_'JKT Engi~n~r ~ng:
JAL~ ~ RAD ~--
/
rev: 03/10/81
' INITIAL ..... GEO. UNIT' ON/OFF
POOL CLASS STATUS AREA NO, SHORE.
.
,.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
,.
No special 'effort has been made to chronologically
organize this category of information.
,o
515 TAPE
VER]FICATIUN LISTING
LVP O,J'-~.H{)5 VERIFICATIOi,,~ LISTING
PAGE
** REEu HEADER **
SERVICE NAME :SWRVIC
DATE :~1/12/~1
ORIGIH :
REEL ~AME ;REEL ID
CONTI~,~ATiON #
PREVIU~IS ~EEL :
COMNEN'!'S :REEL CONNENTS
** TAPE MEAOER **
SERVIC~: NANE :$ERVIC
DAT~ :al/12/21
ORIGid :1070
TAPE H~%ME :62366
CONTI:~t!]ATI~]N # :0~
PREVIsionS TAPE :
COMME::I.~S :TAPE COMMENTS
** F'I~: HEADER
FILE NAME :SERVIC.O01
SERVIC;:: NAME
VERSI~].~ ~ :
DAT~ :
FILE TYPE :
PREVI,]~S ~'ILE
CONTENTS
CN : $()HIH ALASKA PETROLEUM COMPANf
WN : E-20
FN : PRUDHUE BAY
RANG:
TOWN:
SEC~: 6
COUN: NDRTH SLOPE
STAT: ALASKA
CTRY: USA
PRES: NEDiTL~
** RLCORL YPE 047 ~*
TYPE CATE SIZE CODE
000 000 03O O65
000 000 004 065
000 000 012 065
000 000 003 065
000 000 003 065
000 000 001 065
000 000 012 065
OOO 000 006 065
0.00 000 004 065
UNIT TYPE CATE SIZE CODE
000 000 OO7 O65
LYP O0~.H05 VERIFICATIO:9 LISTING PAG~ 2
RECORD TY~E 047 ~*
JOB # 10707,62366
COMPANY NAME
WELL ~%ME
FIELD
COUI~Tf
SECTIO:~
TOWNS~.[P
SOHIO AbASKA ?ETR~]LEUh
E'20
PRUDHOE 6A~
NORTH SLOPE
14g
lin
RANGE = 6
DIL RO:'{ #1 & 2, LOGGED X12'OEC'81
BOTTO~ LOG iNTERVAL = 10252 FT.
TOP bO~; INTEHVAU
CASING'LOGGER
BIT SIZE
TYPE M:]LE FLUID
DENSITY
VISCOS.(TY
PH
FLUID
RM @ qEAS. TEMP.
RMF ~ qEAS. TEMP.
RMC 9 :,IEAS. TEMP.
RM @
9448 FT.
13.38 IN. ~ 2'101 FT.
8.5 IN.
DURENEX
9.0
32.0
: g.o
4.5 ~b
2.070 ~ 6~ F
1.780 ~ 68 F
2.120 @ 6,9 F
0.940 9 158 F
LYP 00~.~05
VERIFICATION
LISTING
PAGE
DATA FORMAT
ENTR~ ~LOCKS
~ECORD **
T~Pg SIZE REPR CODE
.~ 1 66
~ 4 73
~ 4 65
O I 66
DATUM SPECIFICATION BbOCKS
MNEM SEAVlCE SERVICE UNiI APl AP
ID ORDER ~ LOG TYP
DEPT FT 0
SFbU ,)IL OHMM 7
ILM :)lb OMMM 7
ILD ,)iL OHMM 7
SP ')IL ~ 7
GR '.)IL GAPI 7 3
DT ~%HC U$/F 60 5
GR ~HC GAPI 60
NPHI ?DN PO 42 6
RHOB ~DN G/C3 42 3
DRHO FDN G/C3 42 4
CALI ~'D~ IN 42 2
GR ?DN GAPI 42
NRAT ?DN 42 4
NCNb ~DN 42 3
FCN[~ ~ON 42
APl API FILE
CLASS MOD NO.
0 0 0
0 0 0
0 0 0
46 0 0
0 0 0
32 0 0
32 0 0
32 0 0
2 0 0
I 0 0
0 0 0
3 0 0
32 0 0
t 0 0
92 0 0
93 0 0
ENTRY
1
60
.lIN
0
SIZE PROCESS SAMPLE
LEVED
4 0
4 0
4 0
4 0
4 0 1
4 0
4 0
4 0 1
4 0 I
4 o
4 0
4 0
4 0 1
4 0
4 0
4 0 I
REP
COD
68
68
68
68
68
68
68
68
68
68
68
68
68
68
~8
68
DEPT 10306.00u SFbd -99
SP -999.250 GR -99
NPHi 38.477 R~Od
GR ~23.125 NRAf
DEPT 10300.000 SFLU
SP -22.594 GR
NPHI 38.477 RHOB
GR 123.125 NRAT
DEPT 10200.000 SFLQ
SP -29.531 GR
NPHI i3.184 RHGB
9.250 iL~
9.250 DT
2.113 DRHO
3.209 NCN&
295 IbM
6~6q~ DT
2.268 DRHO
3.209 NCN5
1.383 ILM
0.125 DT
2.881 DRMO
-999.250 ILD
-999.250 GR
0.118 CALI
2562.000 FCNb
3.504
86.750 GR
0.107 CALl
2562.000 FCNL
9.148 IbD
78.375 GR
0.187 CALI
-999.,250
. 0
'999,'25~0
4.418
86 688
2:709
764.50O
10.i41
80.125
8.719
bVP OOg. HO5 VERIFICATION LISTING PAGE 4
GR 61.LBO NRA~
DEPT 10100.000 SFLO
SP -76.063 GR
NPHI 22.949 RHOS
GR 94.438 NRA~
DEPI£ 10000.000 SFBU
Sp -69.000 GR
NPHi 22.26b RHOB
GR 3b.18~ NHAT
DEP~> 9900,000 SFLU
Sp -70.375 GR
NPHi 19.727 RhOB
GR 26.641 NRAT
DEPT 9800.000 SFbO
Sp -67.875 GR
NPHI 15.820 RHOB
GR !8.76~ NRA~
DEPT 9700.000 SFLU
SP -66.875 GR
NPHI 17,773 RHOB
GR 26.781 NRAT
DEPT 9600.000 SFb~
SP -74,938 GR
NPHI 13.81~ RHOS
GH 21.~41 NRAT
DEPT 9500.000 SFbU
SP -15.859 GR
NP~ii 20.1!7 RHO5
GR 96,125 NRAT
DEPT 9400.000 SFLU
SP -999.250 GR
NPHI 47.217
GR 62,781 NRAT
DEPT 9300,000 SFhU
Sp -19.078 GR
NPHi -999.250 RHOB
GR -999.250 NRAT
DEPT 9200.000 SFDU
SP -14.602 GR
NPHi -999.250 RHOB
GR -999.250 NRAT
DEP'£ 9100.00~ SFLU
SP -1~.672 GR
43
2
2
17
2
2
23
23
2
2
7
2
2
42
23
2
2
5O
27
2
20
92
2
2
-999
62
2
4
2
50
-999
-999
1
110
-999
-999
2
8O
,9
.4
.5
.4
.5
.9
.3
.4
.7
.0
.4
.3
.2
.7
.4
.0
.4
.4
.4
.2
.0
.1
.!
.9
.7
.2
.0
.4
.1
.1
.8
.4
.1
.2
.2
.8
.5
11
~4
63
39
44
69
81
98
81
94
71
70
98
9~
69
67
19
O0
41
27
81
03
25
75
50
14
-6O
78
13
5O
5O
80
88
5O
5O
14
O0
NCNb
ILM
DT
NCNb
DT
DRHO
NCNb
DT
DRH. O
NCNb
IbM
DT
DRMO
NCNb
DT
DRHO
NCNb
DRHO
NCNb
IbM
DT
DRNO
NCNb
DT
DT
DRHO
NCNb
IbM
DT
DRHO
NCMb
IL~
DT
3~90.000
11.070
83,000
0.079
3084.000
16.984
89.563
0.022
3430.000
16.938
83.000
-0.012
3blO.O00
9.578
75.000
-0.016
4040.000
33.8q4
8!.375
0.00~
3672.000
32.000
105.563
-0.0~5
3666.000
1~,398
7 .750
0.012
2928.000
-999.250
57.375
-0.531
1672.000
2.40B
76.375
-999.250
-999.250
1.245
57.594
-999.250
-999.250
2.766
56,781
FCHb
GR
CALl
FCNb
GR
CghI
FCNL
IbD
GR
CALI
FCNh
IbP
GM
CALl
FCNL
GR
CALI
GR
CAbi
FCNb
ILD
GR
CAI.,I
FCNb
lbo
GR
ILl)
CALl
FCNh
ILD
1883,000
11.992
43.563
8.367
1142.000
18.906
32.969
8 430
1334:000
17.547
23,094
8.578
1567.000
14.773
18.719
8.805
1856.000
35
69
8,7003
606. 00
45 938
9 70
1775.000
11.555
92.625
9 38
1074:0900
-999.250
62.063
8.750
379.750
2.506
50.813
-999.250
-999,25O
1.178
55.438
-999.250
-999.250
2.701
41.406
LVP
GR
DEPT
SP
NPHI
GR
DEPT
NPHi
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPY
SP
NPHI
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
DEPT
SP
NPHi
DEPT
SP
NPHi
DEPT
Oog. H05 VERIFICATION
-999.250 RHDF~
-999.250 NRAT
9000,000 SFLU
-10,844 GR
-999.250 RHOB
-999.250 NRAT
8900.000 SFLU
-8.016 GE
-999.250 RHUB
-999.250 NEAT
9800.000 SFbU
-14.289 GR
-999.250 RHOB
-999.250 NRA]?
8700.000 SFLO
-15.320 GR
-999.250 RHOS
-999.25V NRAT
8600.000 SFbU
'11,070 GR
'999,250 RHOB
'999.250 NRAT
8500.000 SFLU -12,b5b GR
-999.250 RHG6
-999.250 NRAT
8400.000 SFbU
-3.029 GR
-999.250 RH06
-999.250 NRAT
8300.000 SFbU
5.379 GR
-999.250 RHO~
-999,250 NRAT
8200,000 SFbU
2.145 GR
-999.250 RHOB
-999.250 NRAT
BlO0,O00 SFLU
0.922 GR
-999.250 RHOB
-999.250 NRAT
8000,000 SFLU
LISTING
=g99
-999
1
103
=gg9
-999
i
107
-999
=999
3
88
-999
'999
2
94
-999
'999
3
174
=999
-999
5
198
=999
-999
4
160
-999
-999
130
-999
-999
7
79
-999
-999
10
81
-999
-999
.250
.250
,497
.688
,250
.250
,749
,563
.250
.250
.469
875
'250
.
.250
.971
.188
.250
.250
.746
,000
,250
,250
,895
.625
,250
.250
.082
.750
.250
.250
.828
.125
,250
.250
,500
.688
.250
,250
.766
,312
.250
.250
,777
DRHO
NCNb
IbM
DT
DRMO
NCNb
IbM
DT
DRMO
NCNb
IbM
DT
DRRO
NCNb
DT
DRHO
NCNb
IbM
DT
DRHO
IbM
DT
DRHO
NCNb
IbM
DT
DRHO
NCNb
IbM
DT
DRMO
NCNb
Ib~
DT
DRHO
NCNb
DT
DRHO
NCNb
-999,250
-999,250
1.379
56,375
-999.250
-999.250
1,433
-999,250
-999,250
=999.250
i.800
-999.250
-999.250
-999.250
2,641
-999.250
-999.250
-999.250
3.635
'999,250
'999.250
'999.250
4,305
'999.250
'999,250
'999.250
3.801
-999,250
-999.250
-999.250
6.629
-999.250
-999,250
-999.250
7,176
-999,250
-999,250
-999.250
14.031
-999,250
-999.250
=999,250
4.539
FCNb
GR
CAbI
FCNb
GR
CALl
FCNL
GR
CALl
FCNb
IbD
GR
CALI
FCNb
IbD
GR
CALi
FCNb
ILO
GR
CAGI
FCNL
GR
CALI
FCNb
ILL
GR
CALl
FCNb
GR
CALl
FCNL
ILL
GR
CALl
FCNb
PAGE
-9999,250
-99 , 250
67 2
-999.25O
-999.250
~.369
-999.250
-999.250
-999.250
1.714
-999.250
-99 250
2.5~7
-999,250
-999,250
-999,250
:424
-99 250
=999.250
-999.250
4 223
-999:250
3.754
.-999 250
-999,250
6
- 50
-999.250
-999.250
7.242
9 250
-999.250
- 50
-999.250
-999.250
4.477
LVP 009.H05 VERIFICATION LISTING PAGg 6
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
DEPT
SP
NPHI
DEPY
SP
NPiii
DEPT
BP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHi
DEPT
SP
NPHI
DEPT
SP
NPHi
DEPT
SP
3,664 GA
-999.250 RHOS
-999,250 NRAf
7900,000 8FLU
1,405 OR
-999.250
-999,250 NRAT
7800.000 SFLO -13.914 GA
-999,250 RHOB
-999.250 NRAT
7700.000 SFLd
-2i.~0~ G~
-999.250 RHG~
-999.250 NRA/'
7600 . 000
9 922 GR
7500.000 SFbU -32,688 GR
-999.250 R~OB
-999.250 NRAT
7400.000
-31.469 GR
-999.250 RHOB
-999.250 NAA1~
7300,000 $F50
-20.188 GR
-999,250 RHOi~
-999.250 NRAt
7200.000 SFLU -24,984 GR
-999,250 RHOB
-999,250 ~RAT
7100.000 SFbd
-27.063 GR
-999,250 RHO~
-999,250 NRAT
7000.000 SFLd
-999,250 RHOD
-999,250 NRAT
126.6
-999.2
-999.2
6.9
100.7
-999,2
-999.2
6.8
86.3
-999.2
-999.2
7.0
82.6
-999 2
-999:2
4.7
87.0
-999.2
-999.2
6.4
99.4
-999.2
-999.2
3.1
89.6
-999.2
-999.2
2.6
76.0
-999.2
-999.2
3.3
82.2
-999.2
-999.2
3.2
80.9
-999.2
'"999.2
3.2
79.0
-999.2
-999.2
25
50
5O
49
50
50
5O
91
12
5O
5O
39
5O
50
63
50
5O
49
38
50
50
8O
5O
5O
O0
50
50
59
5O
5O
5O
7O
38
5O
.50
~7
00
50
5O
DT
DRHO
DT
DRBO
NCNb
IL~
DT
DRHO
NCNb
DT
DRHO
NCNS
DRMO
NCNb
IbM
DT
DRHO
NCN&
IbM
DT
DRHO
I~
DT
DRHO
NCN5
DT
DRHO
Ib~
DT
DRHO
NCNb
DT
DRHO
-999,250
-999,250
-999,250
6.883
-999.250
-999.250
-999.250
6,547
-999.250
-999.250
-999.250
7,184
-999,250
-999,250
-999.250
4.836
-999.250
-999,250
-999,250
6.469
-999,250
-999,250
-999.250
3,371
-999,250
-999,250
-999.250
3.178
-999.250
-999.250
-999.250
3,018
-999,250
-999,250
-999,250
3,029
-999.250
-999,250
-999,250
3.469
-999,250
-999,250
-999.250
G~
CAL~
FCN~
IbP
GR
CALl
FCNL
IbD
GR
CAb i
FCNL
GR
CALI
FCNL
IbD
CALI
FC~b
GR
CALl
FCNL
ILD
GR
CALI
FCNb
GR
CALl
FCNL
ILD
GR
CALl
FCNL
ILD
GR
CALl
FCNL
ILD
GR
CAbi
-999,250
-999.250
-999,250
6.883
-999.250
-999.250
-999.250
6.695
-999 50
-999,250
7.2~7
-999,2 0
-999.250
-999,250
4.859
-99 250
-999.250
6 449
: 99
99~250
3.410
-999.250
-999.250
-999,250
3.018
-999.250
-999.250
-999.250
3,340
-999 250
-999~250
-999,250
3.158
-999,250
-999.250
-999.250
3,574
-999,250
-999.250
-999,250
DEPT
~PH~
GR
DEPT
SP
NPHI
DEPT
SP
NPHi
DEPT
SP
NPHI
DEPT
SP
NPHi
GR
DEPT
SP
NPHI
DEPT
SP
NPHI
DEPT
SP
NPHI
DEPT
SP
NPHI
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
0900.000 ,F~U
-60.500 GR
'999.250 RHO~
-999,250 NRAT
6800,000 SFLU -98,375 GR
-999,250 RH08
-999,250 NRAT
6700.000 ,FhU -5i,750 GR
-999.250 RHOE
-999,250 NRAT
6600,000 SFhU -56,000 GR
-999.250 RHOB
-999.250 NHAT
6500.000 SFLO -70.375 GR
-999,250 RHOB
-999.250 NRAT
6400.000 Sf'LU
-53.219 GR
-999.250 RHOB
-999.250 NRAT
~300,000 'FLU
-119.563 GR
-999,250 RtiO~
-999.250 NRAT
6200,000 SFLU -86.250 GR
-999.250 RHOB
-999.250 NRAT
6100.000 SFLb -73.563 GR
-999.250 RROB
-999.250 NR~Y
6000.000 SFLU -80.375 GR
-999.250 RHOB
-999.250 NRA~
5900.000 SFLU
-64.750 GR
-999.250 RH06
-999.250 NRAT
LISTING
,
59.
-999,
-999
,
51.
-999,
-999,
.
79,
'999.
-999,
,
69.
-999,
-999.
.
70,
-999,
-999.
75.
'999
'999
,
26,
-999.
-999.
53.
-999
-999
2~
51,
-999 .
-999.
,
49.
-999.
-999'
.
51.
-999,
-999,
~63
250
259
348
750
250
25O
857
438
25O
250
76O
3t2
25O
25O
164
5OO
25O
250
662
250
250
2.50
250
250
2.5,'0
576
219
250
250
207
312
250
250
283
063
250
25O
180
000
250
250
ILM
DT
DRHO
NCNb
IL~
DT
DRHO
NCNb
DT
DRHO
NCNL
DT
DRHO
IbM
DT
DRHO
NCNb
IL~
DT
NCNb
In~
DT
DRHO
NCNL
IL~
DT
DT
DRHO
NCNb
IbM
DT
DRHO
NC~L
DT
DRHO
NCNb
2,891
-999.250
-999.250
-999.250
2.39~
-999.250
-999.250
-999.250
~,250
-999.250
-999.250
-999.250
3,055
-999.250
-999,250
-999.250
1.965
-999,250
-99~.250
-999.250
2.631
-999.250
-999.250
-999.250
0,935
-999.250
-999,250
-999.250
1.583
-999,250
-999.250
-999.25O
1.781
-999.250
-999,25O
-999.250
1.837
-999.250
-999,250
-999.250
1.499
-.999.250
-999.250
-999,250
CALl
FCNL
ILL
GR
CALl
FCNb
ihO
GR
CALl
FCNL
I LD
GR
CALI
FCNL
ILL
GR
CALl
' GR
CALl
FCNb
ILD
GR
CASf
FCNG
G~
CALl
FCNb
ILL
GR
CALl
FCNL
ILL
GR
CALl
FCNh
GR
CALf
FCNL
PAGE
2.840
-999,250
-999.250
-999.250
2,086
-999 50
-999.250
4,406
-999.250
-999 ~50
-999~ 50
3.312
-999 2250
-999: 50
-999.250
- 50
-999.250
-999,250
2.527
-999,250
-999.250
-999.250
805
-999.250
-999.250
1.414
99~*.250
-999,250
919,673
-9 .250
99 250
! .603
99.250
99.250
1.398
99 250
-999.250
LVP 009.H05 VERIFICATION LISTING PAGE
DEPT 5800.000 SFLU
Sp -40.469 GR
NPHI -999.250 RHOb
GR -999.250 NRAT
DEPT 5700.0{)0 SFLO
Sp -66.375 GR
NPHI -999.250 RHO~
GR -999.250 NRAT
DEPT 5600.000 SFLb
Sp -29.51~ GR
NPHi -999.250 RHOb
GR -999.250 NRAT
DEPT 5500.000 SFbU
SP -47.719 GR
NPHI -999,250 RHOD
GR -999,250 NRAT
DEPT 5400.000 SFLU
SP -72.125 GR
NPHi -999.250 RHO~
GR -999.250 NRAT
DEPT 5300,000 SFLb
Sp -41.781 GR
NPHI -999,250 RHOD
GR -999.250 NRAT
DEPT 5200.000 SFLU
Sp -51.bO0 GR
NPHI -999,250 RHOB
GR -999.250 NRAI
DEPT 5100,000 SFbb
Sp -107.125 GR
NPHI -999,250 RHOB
GR -999.250 NRA~>
DEPT 5000,000 SFLO
Sp -50.78! GR
NPHI -999.250 RHOD
GR -999.250 NRAT
DEPT 4900.000 SFLU
Sp -55.531 gR
NPHi -999,250 RHOB
GR -999,250 NRAI
DEPT 4800.000
SP -30.500
NPH~ -999.250 RH05
3,443
63.53~
-999.250
-999.250
2.~23
55.094
-999.250
-999.250
2.7~5
77.875
-999.250
-999.250
3,455
77.25U
-999.250
-999.250
3.465
55.9m6
-999.250
-999.250
3.354
86.93~
-999.250
-999.250
3.45i
67.250
-999.250
-999.250
3.7!7
26.859
-999.~50
-999.250
2.469
66.186
-999.~50
-999.250
5.547
61.5h3
-999.250
-999.250
3,262
94,1~6
-99~.250
DT
DI
NCNb
IbM
DT
DRHO
Ib~
DT
DRHO
NCNb
DT
NCNb
IDN
DT
DRHO
NCNb
DT
DRHO
NCNb
DT
DRHO
NCNb
IbM
DT
DRHO
NCNb
DT
DRHO
,2.875
-999.250
-999.250
-999.250
~,54~
-999.250
-999.250
-999.250
3.055
-999.250
-999.250
-999.250
3.406
-999.250
-999 50
2.357
-999,250
-999.250
-999,250
3.410
-999.250
-999.250
-999.250
3.088
-999.250
-999,250
-999.250
1.500
-999,250
-999.250
-999.250
2.232
-999,250
-999,250
3.721
-999,250
-999.250
-999.250
3.447
-999,250
-999.250
GR
CALI
FCNh
GR
CALI
FCNb
I bD
GR
CALI
FCNL
GR
CALI
FCNL
ILO
GR
CALl
FCNL
GR
CALi
FCNb
CALI
FCNb
I6D
GR
CALI
FCNb
ILD
GR
CALl
FCNL
GR
CALI
FCNL
I6D
GR
CALI
2.721
-999.250
-999.250
-999.250
! .506
-999.250
2.959
-999 ~50
-999:50
-999.250
3 66
-999 50
2.199
-999.250
-999,250
-999.250
25O
-999,250
-999.250
2,998
-999.250
-999.250
-999.250
1,340
-999,250
2.230
-999.250
-999,250
-999.250
-999 50
-999 250
-999,250
3,766
-999,250
-999.250
GR
DEPT
SP
NPH1
GR
DEPT
SP
NPHI
DEPT
SP
NPHI
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHi
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
SP
Ou~.H05 VERIFICATIOt:
-999.250 NRAT
4700,000 SFLU -32.781 GR
-999,250 RHO5
-999.250 NRAT
4600,000 SFLU
-59,781 GR
-999.250 RHO~
-999.250 NRAT
4500.000 SFbb
-33.250 GR
-999.250 RHOE
-999.250 NRAT
4400,000 SFLD -76.938 GR
-999,250 RHOB
-999'250 NRAT
4300.000 SFbU -32.781 GR
-999.250 RHOB
-999,250 NRAT
4200.000 SFLU
-43.000 G~
-999,250 RHOB
-999.250 NRA~
4100.000 SFLU -75.563 GR
-999.250 RHOB
-999.250 NRAT
4000.000 SFDU -81.375 GR
-999.250 RHOB
-999.250 NRAI
3900.000 SFbU -75.813 GA
-999.250 RHO~
-999.250 NRAT
3800,000 SFLU -45.750 GR
-999.250 RHOB
-999,250 NRA%'
3700.000 SFhU
-86,000 GR
'999
86
-999
-999
4
56
-999
-999
4
79
-999
-999
4
39
-999
-999
4
86
-999
-999
4
70
-999
-999
4
63
-999
-999
4
51
-999
-999
47
-999
-999
4
72
-999
-999
4
51
.256
.62r--
.250
,250
.109
.7!9
.250
.250
.445
.332
.250
.250
.152
.094
.250
.250
.277
.68~
.250
.250
.387
.125
.250
.250
.703
.000
.250
.250
.152
.938
.250
.250
.07~
.094
.250
.250
.648
.i25
.250
.250
.723
.344
DT
DRHO
NCNb
DT
DRHO
NCNb
DRH~
NCNB
IL~
DT
DRHO
DT
DRHO
NCNB
~T
DRHO
DT
DRHO
NCNb
IL~
DT
DRHO
IL~
DRHO
DI
DRHO
NCNb
IbM
DT
-999.250
4.391
-999.250
-999.250
-999.250
3.688
-999.250
-999.250
-999.25O
6.402
-999.250
-999,250
-999.250
2.484
-999.250
-999.250
-999.250
4.137
-999.250
-999.250
-999,250
6.234
-999.250
-999.250
-999.250
2.95!
-999.250
-999.250
-999.250
2.455
-999,250
-999,250
-999.250
2,691
'999,250
-999,250
-999.250
4,156
-999,250
-999,250
-999,250
2.484
-999.250
GR
FCN5
CA~i
FCN~
I bD
GR
CAI,i
FCNL
ILD
GR
CALI
GR
CALl
FCNL
CALl
FC~L
GR
CAI!I
IbD
GR
CALl
FCN6
GR
CALl
FCNb
I hD
GR
CALI
FCNb
ILD
GR
PAGE
-999,250
4,480
-999 250
-999!250
-999 250
3.439
-999,~50
-999, 50
-999.250
4.633
-999.250
-999.250
-999.250
2.186
-999 250
-999i250
-999 250
4,566
-999,250
-99 250
219
250
-999,250
2,551
-999,250
-999,250
-999.250
2. I'95
.250
-999,250
2 512
-999~250
50
4 266
99'250
-999.250
2,225
-999.250
LVP 0£.9.H05 VERIFICATION LISTING PAGE 10
DEPT
SP
NPHI
DEPT
,P
NPHI
DEPT
SP
NPHI
GR
DEPT
,P
NPHi
GR
DEPT
$P
NPHI
DEPT
,P
NPHI
DEPT
,P
NPHI
DEPT
SP
NPHI
GR
DEPT
BP
NPHI
GR
DEPT
SP
NPHI
GR
DEPT
-999.25U RHOf:
-999.250 NRA~
3600.000 SFLU
-47.969 GR
-999,250 RHOB
-999,250 NRA~~
3500.000 SFbU
-25.500 GR
-999.250 RHOE
-999.250 NRAT
3400.000 ,Fbb
-45.781 GR
-999.250 RHOB
-999.250 NRA~
3300.000 BP'Lb
-86.250 GR
-999.250 R[tOS
-999.250 NRAI~
3200.000 SFLU
-66.500 GR
-999.250 RHOB
-999.250 NRA?
3100.000
-31'750 GR
-999.250
-999.250 NRAT
3000.000 ,FLU
-49.750 GR
-999.250 RHOB
-999.250 NRAT
.2900,000 $FLU
-57.563 GR
-999.250 RHOb
-999.250 NRAT
2800.000 SFbU
-35.312 GR
-999.250 RMOB
-999.250 NRAT
2700.000 SFbU -36.781 GR
-999.250 R~OD
-999.250 NRAT
2~83.500 SFLO
-999.
-999.
.
-99 .
-999.
,
89.
-999.
-999.
.
72.
-999.
-999.
e
45.
-999.
-999.
·
-999,
·
81.
-999.
-999.
·
71.
-999.
-999.
·
54.
-999.
-999.
.
80.
-999.
-999.
·
32.
-999.
-999.
·
250
25o
445
375
250
250
371
438
250
250
176
3~.2
250
250
312
250
250
3~]
394
250
250
172
813
250
250
113
688
250
250
287
250
250
03i
625
250
25O
~32
813
250
25O
96i
DRHO
NCNL
DT
DRHO
NCNb
DT
DRH~
NCNb
DR~O
DT
DRHO
NCNL
DT
DR~O
NCNb
DT
DRHO
NCNb
DT
DRHO
NCNb
IbM
DT
DR~O
NCNb
DT
DRMO
NCNb
IbM
DT
ORNO
NCNb
-999.250
-999.250
2.859
-999.250
-999.250
-999.250
2.225
-999.250
-999.250
-999.250
2.586
-999.250
-999.250
-999.250
1.214
-999.250
-999.250
-999.250
2,043
-999,250
'999,250
'999.250
2.176
-999.250
-999.250
-999.250
1.909
-999.250
-999.250
-999.250
2.529
-999.250
9.250
2.064
-999.250
-999.250
-999.250
2000.000
-999.250
-999.250
-999.250
40.688
CALl
FCNb
ILO
GR
CALI
IbD
GR
CALI
FCNb
IbP
GR
CALI
FCNL
GR
CALl
FC~b
GR
CALI
FCNb
GR
CALl
FCNb
IbD
GR
CALI
FCNL
GR
CALf
FCNL
ILD
GR
CALI
FCNb
G~
CALl
FCNL
I LD
-999 250
-999;250
2.818
-999 ~50
-999~ 50
-999.250
2 90
- 50
2 506
99 250
999 250
1,141
99,250
999.250
I 872
'999i250
-999 250
-999 250
2
-999,250
-999.250
1.834
-999.250
-999,250
-999.250
2.332
-999.250
'999,~50
-999. 50
2.320
-999.250
-999.250
-999.250
2O00.0O0
-999.250
2000.000
LVP O(;g. H05 vERIFICATION LISTING
SP
NPHI
GR
33.71~ G~
-999.250 RHO~
-999.250 NRAY
27.266 D~
-999.250 DRUO
-999.250 ~CNL
*~ FILE T~AIDER
FIDE NA~,E :SERVIC.OO1
SERVICE NAME
VERSION # :
DAT~ :
MAXIMU~ LENGTH : 1024
FILE TYPE
NEXT FILE NAME :
'999.250 GR
-999.250 CALf
-999. 250 FCNL
PAGE
'99 250
-999.250
** TAPE THAIbER **
SERVICE NA~E :$ERVIC
DATE :81/12/21
ORIGIN :1070
TAPE NAME :62366
CONTInUATiON # :01
NEXT TAPE NAME :
COM~EP:T$ :TAPE COMMENTS
** REEL TRAILER **
SERVICE NAME :SERVIC
DATE :91/12/21
REED LAME fREED ID
CONTi[~UATI[]N ~
NEXT REEL NAME :
COMME~T$ :REEL COMMENTS
***~*~**** EOF
~as~a Dil &
WESTERN
ATLAS
Atlas Wireline Services
Tape Subfile 2 is type: LIS
- TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
E - 20 (24-05-11-14)
500292057600
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
24-SEP-94
1470.01
K. RICHARDS
J. BENNETT
6
11N
14E
1743
883
60.50
59.50
30.40
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
9.625 9458.0 47.00
7.000 10262.0 26.00
5.500 8909.0 17.00
4.500 9051.0 12.60
BASELINE DEPTH
9370.0
9458.0
9464.5
9472.0
9474.0
9476.5
9488.5
9492.5
9495.0
9497.5
9501.0
9501.5
9504.0
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH
9370.0
9458.5
9464.5
9473.5
9475.0
9478.0
9490.0
9494.0
9495.5
9499.0
9503.0
9503.5
9505.5
BHCS
GR
2
1
27-NOV-81
SCHLUMBERGER WELL SERVICES
9506.5
9507.0
9519.5
9520.5
9523.5
9528.0
9537.0
9538.0
9551.0
9551.5
9552.5
9553.5
9555.0
9561.5
9571.0
9574.0
9579.0
9586.0
9589.0
9600.5
9624.0
9626.0
9632.0
9633.0
9636.0
9639.0
9640.5
9641.5
9642.0
9645.5
9650.0
9658.0
9662.5
9678.5
9681.0
9683.0
9692.5
9696.0
9697.5
9701.0
9708.0
9713.0
9717.0
9721.0
9738.0
9746.5
9748.5
9754.0
9763.5
9764.5
9766.5
9767.0
9771.0
9774.0
9788.0
9791.0
9802.0
9810.0
9815.0
9816.0
9508.0
9509.0
9521.5
9522.0
9525.0
9529.0
9538.0
9538.5
9551.5
9552.5
9553.5
9554.0
9555.5
9562.5
9572.0
9574.0
9579.0
9584.5
9589.0
9601.0
9624.5
9626.5
9632.5
9634.0
9637.0
9640.0
9641.5
9642.0
9642.5
9646.5
9650.5
9659.0
9663.5
9679.0
9681.5
9683.5
9693.5
9697.0
9698.0
9701.0
9708.0
9713.0
9717.0
9721.0
9739.0
9746.5
9748.5
9754.5
9764.0
9764.5
9766.5
9767.5
9771.5
9774.5
9788.5
9792.0
9798.5
9808.5
9813.5
9815.5
9820.5
9831.0
9845.0
9851.0
9857.0
9862.5
9864.5
9873.0
9874.5
9884.0
9888.0
9891.5
9892.0
9895.0
9895.5
9896.0
9897.5
9900.0
9901.0
9902.0
9904.0
9905.0
9906.5
9909.0
9913.0
9919.0
9920.5
9924.0
9926.0
9932.0
9936.0
9939.0
9941.5
9947.5
9949.0
9953.5
9954.5
9957.0
9958.0
9959.0
9960.5
9961.5
9968.5
9973.0
9976.0
9980.0
9984.0
9987.0
9992.0
9995.0
9998.0
10006.0
10007.5
10009.5
10013.5
10017.0
10019.5
10022.5
10026.0
10033.0
9818.5
9832.0
9845.0
9852.0
9857.5
9861.5
9863.5
9872.0
9873.0
9883.5
9888.0
9891.0
9892.0
9895.0
9896.0
9897.0
9897.5
9900.5
9901.0
9901.5
9903.5
9905.0
9906.5
9909.0
9912.0
9919.0
9920.5
9922.5
9925.0
9932.0
9936.0
9939.0
9941.5
9948.0
9949.0
9953.5
9954.0
9956.5
9958.0
9959.0
9960.5
9961.0
9968.0
9973.0
9977.0
9981.5
9984.0
9986.5
9991.5
9994.0
9996.5
10006.0
10007.5
10009.5
10013.0
10016.0
10019.5
10022.0
10025.5
10031.0
10036.0
10041.0
10046.0
10051.0
10061.0
10064.0
10068.0
10069.5
10074.0
10078.5
10086.0
10087.0
10089.5
10091.0
10093.0
10095.0
10097.0
10098.0
10098.5
10099.0
10103.5
10109.0
10121.0
10165.0
$
REMARKS:
10034.0
10039.0
10046.0
10050.5
10061.0
10064.5
10068.0
10069.5
10074.5
10078.5
10084.5
10086.0
10088.0
10091.5
10093.0
10095.0
10098.5
10099.5
10100.0
10100.5
10104.5
10107.5
10120.5
10165.0
CN/GR CASED HOLE.
LOG TIED TO GAMMA RAY LOG DATED 30-AUG-82.
ORIGINAL OPEN HOLE CNL LOG RAN IN LIMESTONE MATRIX.
MAX DEV. ANGLE 42 DEGREES AT 10,000 FEET. LOG RAN AFTER
PUMPING 150 BBLS OF SEAWATER.
CN LOGGING PARAMETERS:
LIMESTONE MATRIX
CHISM OFF
CALIPER CORRECTION = NONE
CASING CORRECTIONS OFF
SALINITY = 0 PPM.
PRODUCTION TEST (27-AUG-94):
GROSS FLUID RATE =
NET OIL RATE =
FORMATION GAS =
WATER CUT =
CHOKE =
2.01 MBPD
2.00 MBOPD
24.06 MMSCFD
0.2 PCT
55.8
SHIFT PROCEDURE IS AS FOLLOWS:
1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE
GAMMA RAY.
2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED"
FIRST PASS GAMMA RAY.
3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS NEUTRON.
/??MATCHiA.OUT
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: i
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9380.0 10128.0
9393.0 10136.0
BASELINE DEPTH
9370.0
9456.0
9457.5
9503.5
9506.5
9508.5
9511.5
9514.5
9517.5
9548.0
9548.5
9549.5
9553.5
9554.0
9588.5
9623.5
9636.0
9650.0
9667.0
9679.0
9681.5
9683.0
9696.0
9699.0
9707.5
9717.0
9721.0
9732.5
9737.5
9774.0
9814.5
9816.0
9847.0
9856.5
9886.5
9888.0
9889.0
9890.0
9893.5
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH
NPHI
9370.0
9453.0
9454.0
9499.0
9502.0
9504.5
9508.5
9510.0
9518.0
9545.5
9547.5
9548.5
9555.0
9555.5
9588.5
9622.0
9636.0
9650.0
9669.0
9680.0
9682.5
9684.0
9698.5
9701.0
9706.0
9716.0
9720.0
9732.0
9737.5
9772.0
9813.0
9815.0
9844.5
9856.5
9887.5
9889.0
9889.5
9890.5
9893.5
9896.0
9897.0
9899.0
9899.5
9900.5
9901.5
9936.5
9937.5
9951.0
9951.5
9953.0
9954.0
9954.5
9959.0
9973.0
9984.0
9987.0
9989.5
9998.5
10008.5
10010,5
10022.5
10036.5
10046.0
10064.0
10067.5
10070.5
10073.5
10077.0
10086.5
10100.5
10106.5
10112.0
10144.0
10144.5
10145.5
10146.5
10165.0
$
REMARKS:
9896.0
9896.5
9898.5
9899.5
9900.5
9901.0
9936.0
9936.5
9948.0
9948.5
9949.0
9949.5
9950.0
9957.5
9970.0
9981.0
9982.5
9985.5
9992.0
10007.0
10008.5
10017.5
10030.0
10042.5
10059.5
10064.5
10066.5
10068.5
10071.0
10080.5
10101.0
10106.5
10112.0
10141.0
10141.5
10142.0
10142.5
10165.0
PASS 1.
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
CN
WN
FN
COUN
STAT
/ ? ?MATCH1B . OUT
$
: BP EXPLORATION
: E- 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI
2 NPHI 2418 68 1 PU-L
3 FUCT 2418 68 1 CPS
4 NUCT 2418 68 1 CPS
5 TENS 2418 68 1 LB
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
2O
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 38
Tape File Start Depth = 10165.000000
Tape File End Depth = 9370.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9547 datums
Tape Subfile: 2 388 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9381.0 10128.0
9393.0 10136.0
BASELINE DEPTH GRCH
9370.0 9370.0
9383.5 9382.5
9387.0 9385.5
9388.5
9394.0 9393.0
9395.5 9395.5
9398.0
9399.5 9400.0
9402.5 9401.5
9405.0 9404.5
9410.0 9410.5
9412.5 9412.5
9416.0
9420.5
9424.0
9425.5
9427.5
9434.0
9440.0
9442.5
9444.0
9446.5
9448.5
9454.5
9461.5
9463.5
9416.0
9420.0
9424.5
9426.5
9428.0
9436.0
9440.5
9443.0
9445.0
9447.0
9448.5
9451.5
9458.0
9460.5
9462-5
9463.5
9464.5
9467.5
9468.5
9469.0
9471.0
9471.5
9472.0
9477.0
9479.5
9467.5
9471.5
9477.0
9481.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH -
NPHI
9370.0
9387.5
9397.0
9459.5
9460.5
9461.0
9464.0
9464.5
9465.5
9466.0
9483.5
9485.5
9488.0
9490.0
9490.5
9491.0
9491.5
9492.5
9494.5
9498.0
9499.5
9504.0
9506.5
9513.0
9515.0
9515.5
9516.5
9520.5
9526.0
9528.5
9529.5
9534.5
9536.0
9538.0
9540.5
9542.0
9543.0
9544.5
9545.5
9548.5
9549.5
9551.0
9553.5
9561.5
9567.0
9569.0
9578.5
9582.0
9589.0
9591.5
9592.0
9593.0
9594.0
9600.0
9603.0
9609.0
9611.5
9617.5
9618.5
9619.5
9620.5
9621.0
9621.5
9624.0
9627.0
9627.5
9631.0
9631.5
9632.0
9633.0
9488.5
9490.5
9492.0
9494.5
9498.5
9501.0
9507.5
9516.5
9517.0
9529.0
9529.5
9548.5
9549.0
9553.0
9561.5
9567.5
9569.5
9578.0
9581.0
9588.5
9592.0
9593.0
9593.5
9600.0
9603'0
9610.5
9623.5
9627.0
9632.0
9633.0
9480.0
9482.0
9485.5
9486.0
9486.5
9487.0
9498.5
9509.5
9511.5
9519.5
9525.0
9532.0
9534.5
9536.5
9538.5
9540.0
9540.5
9542.0
9542.5
9548.0
9591.0
9599.5
9607.0
9615.5
9616.0
9616.5
9617.5
9619.0
9619.5
9626.0
9629.5
9630.5
9631.5
9636.
9638.
9639.
9640.
9640.
9643.
9644.
9650.
9653.
9659.
9667.
9677.
9680.
9682.
9683.
9687.
9687.
9690.
9693.
9695.
9698.
9707.
9708.
9717.
9720.
9721.
9722'
9726.
9728.
9737.
9738.
9739.
9743.
9747.
9749.
9755.
9756.
9757.
9758.
9758.
9763.
9769.
9769.
9770.
9771.
9773.
9773.
9777.
9781.
9783.
9784.
9798.
9803.
9816.
9828.
9832.
9834.
9836.
9849.
9851 ·
9636.5
9638.5
9640.0
9641.0
9643.5
9644.0
9650.0
9653.0
9659.0
9669.0
9678.5
9682.5
9692.5
9698.5
9707.0
9717.0
9721.0
9721.5
9728.5
9738.0
9740.0
9747.0
9754.5
9755.0
9757.0
9758.0
9763.0
9768.5
9769.5
9770.0
9770.5
9772.5
9773.5
9777.5
9802.5
9815.0
9832.0
9850.0
9852.0
9639.0
9680.5
9683.5
9687.5
9688.0
9692.0
9697.0
9706.5
9716.0
9718.5
9725.0
9738.0
9742.5
9746.0
9748.5
9757.5
9772.0
9781.0
9782.5
9783.0
9801.5
9815.0
9828.0
9831'.5
9833.5
9856.
9856.
9864.
9867.
9868.
9874.
9876.
9877.
9877.
9880.
9885.
9885.
9886.
9887.
9887.
9888.
9890.
9890.
9891.
9894.
9894.
9895.
9896.
9898.
9899.
9901.
9903.
9904.
9915.
9920.
9925.
9936.
9937.
9939.
9940.
9940.
9942.
9947.
9950.
9951.
9952.
9953.
9955.
9959.
9961.
9962.
9963.
9964.
9966.
9970.
9972.
9979.
9980.
9981.
9982.
9984.
9986.
9987.
9990.
9990.
0
5
0
5
0
0
0
0
5
5
0
5
5
0
5
5
0
5
0
0
5
5
5
5
5
5
0
5
0
0
5
O'
0
5
0
5
0
5
5
0
0
0
5
5
0
5
0
0
5
0
5
0
5
0
0
0
5
0
0
5
9856.5
9872.5
9880.5
9886.5
9887.0
9890.0
9891.0
9894.0
9898.5
9899.0
9901.0
9905.0
9915.0
9918.5
9925.0
9936.0
9940.0
9947.5
9952.0
9952.5
9955.0
9958.5
9962.0
9962.5
9966.0
9969.5
9972.5
9980.5
9981.0
9981.5
9984.0
9986.0
9990.0
9853.5
9863.5
9867.0
9868.0
9876.0
9876.5
9877.0
9885.5
9886.0
9886.5
9887.0
9887.5
9889.0
9894.0
9895.0
9895.5
9902.0
9935.5
9938.0
9938.5
9939.0
9947.5
9948.5
9950.0
9951.0
9959.5
9961.0
9962.0
9976.5
9983.0
9985.5
9991.5
9994.0
9997.5
9998.0
10003.5
10008.5
10011.0
10012,5
10017.0
10022.5
10026.5
10027.5
10028.0
10028.5
10030.5
10031.5
10033.0
10035.0
10036.5
10038.0
10039.0
10041.0
10043.0
10046.0
10046.5
10049.5
10050.5
10053.5
10056.5
10057.0
10057.5
10060.5
10062.5
10064.5
10065.5
10067.0
10068.5
10070.0
10071.5
10073.5
10074.0
10078.5
10082.0
10086.5
10087.5
10089.0
10094.0
10095.5
10096.0
10097.0
10099.5
10103.5
10105.5
10107.5
10110.0
10111.5
10112.0
10114.5
10117.5
10123.0
9990.5
9993.0
9997.0
10003.0
10008.5
10012.0
10016.5
10022.0
10026.0
10026.5
10029.5
10030.0
10033.5
10041.0
10046.5
10050.5
10052.5
10055.5
10056.5
10060.0
10066.0
10069.0
10071.5
10074.5
10079.0
10082.5
10086.0
10089.0
10097.0
10097.5
10098.0
10104.5
10107.0
10109.0
10111.0
10113.0
10116.5
10123.0
9992.5
10008.0
10010.0
10022.0
10022.5
10023.5
10024.0
10027.0
10029.0
10032.0
10033.5
10037.5
10043.5
10046.5
10051.5
10055.0
10058.5
10060.5
10067.5
10071.0
10074.5
10083.5
10090.5
10095.0
10099.5
10106.5
10112.0
10128.5
10129.5
10130.0
10130.5
10137.0
1O139.5
1O142.0
10142.5
10165.0
REMARKS:
10165.0
10125.5
10126.5
10127.5
10128.5
10135.5
10139.5
10140.0
10140.5
10165.0
PASS 2.
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
/ ? ?MATCH2A. OUT
/ ? ?MATCH2 B . OUT
$
: BP EXPLORATION
: E- 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI 4
2 NPHI 2418 68 1 PU-L 4
3 FUCT 2418 68 1 CPS 4
4 NUCT 2418 68 1 CPS 4
5 TENS 2418 68 1 LB 4
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 38
Tape File Start Depth = 10165.000000
Tape File End Depth = 9370.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9547 datums
Tape Subfile: 3
Minimum record length:
Maximum record length:
358 records...
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 9384.0 10128.0
2418 9396.0 10136.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH
9370,0
9386.5
9388.5
9389.5
9394.0
9395.5
9397.5
9398.0
9399.5
9405.0
9407.5
9415.0
9420.0
9428.0
9430.0
9431.5
9435.5
9440.0
9447.0
9448.5
9452.0
9454.0
9455.0
9457.5
9460.0
9462.0
9466.0
9469.0
9472.0
9485.0
9491.5
9492.0
9493.0
9493.5
9494.5
9497.5
9504.5
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH NPHI
9370.0 9370.0
9388.0
9390.5
9390.0
9393.0
9395.5
9397.5
9400.0
9399.5
9405.0
9407.5
9415.0
9420.5
9427.0
9430.0
9431.5
9435.5
9440.0
9446.5
9448.0
9454.0
9451.0
9452.0
9454.0
9459.5
9458.5
9465.5
9469.0
9472.0
9482.0
9492.5
9489.0
9489.5
9490.0
9495.0
9499.0
9500.0
9505.0
9505.5
9506.0
9508.0
9509.0
9509.5
9514.5
9517.0
9521.5
9525.5
9532.0
9532.5
9533.0
9534.5
9536.0
9538.0
9538.5
9540.0
9542.5
9543.5
9545.5
9547.0
9548.0
9549.0
9549.5
9550.5
9551.5
9552.0
9561.5
9570.5
9572.5
9579.0
9594.5
9596.0
9600.5
9607.0
9619.5
9624.0
9629.0
9629.5
9632.0
9633.0
9636.0
9638.5
9639.0
9641.0
9650.0
9653.0
9663.5
9670.5
9674.5
9675.5
9679.5
9683.0
9690.0
9693.0
9698.0
9701.5
9708.0
9714.5
9507.0
9517.5
9532.5
9533.0
9538.5
9545.0
9549.0
9551.0
9552.0
9562.0
9578.0
9594.0
9624.0
9630.0
9632.0
9633.0
9636.5
9639.5
9641.5
9650.0
9653.0
9683.0
9693.0
9701.5
9708.0
9500.5
9501.0
9503.0
9503.5
9504.0
9510.5
9515.5
9520.0
9522.5
9529.0
9532.5
9534.0
9536.0
9538.0
9540.5
9541.0
9544.5
9545.0
9545.5
9546.0
9547.0
9568.0
9570.0
9595.0
9599.5
9605.0
9617.5
9627.5
9628.0
9635.5
9638.5
9664.5
9670.5
9674.5
9675.0
9679.0
9691.5
9699.5
9713.0
9717.0
9720.5
9726.5
9728.5
9735.0
9737.5
9743.5
9748.5
9749.5
9756.0
9759.0
9761.5
9763.0
9764.0
9764.5
9767.0
9772.5
9774.0
9778.5
9779.5
9781.5
9783.5
9802.0
9814.5
9816.0
9816.5
9817.5
9825.5
9829.0
9833.0
9836.0
9838.0
9840.5
9843.0
9847.0
9849.0
9850.5
9851.5
9852.5
9853.0
9856.5
9866.5
9867.5
9877.0
9877.5
9882.0
9884.0
9885.5
9886.5
9887.5
9888.0
9888.5
9889.0
9890.5
9891.0
9891.5
9894.5
9895.5
9897.0
9902.5
9716.5
9737.5
9749.5
9759.5
9761.5
9763.5
9767.0
9772.5
9774.0
9778.5
9779.0
9801.5
9815.5
9847.0
9856.0
9869.5
9884.0
9888.0
9888.5
9890.0
9891.0
9894.5
9895.0
9716.0
9718.5
9725.5
9728.5
9734.5
9738.0
9743.0
9749.0
9756.0
9765.0
9765.5
9781.0
9783.0
9813.0
9815.0
9817.0
9823.5
9827.0
9831.5
9834.5
9837.0
9841.5
9844.0
9850.0
9851.5
9852.0
9853.0
9854.0
9865.0
9876.0
9876.5
9882.0
9886.0
9886.5
9887.0
9887.5
9891.0
9896.0
9901.5
9908.0
9910.0
9911.0
9914.5
9920.5
9922.0
9924.0
9925°5
9937.0
9937.5
9939.5
9940.5
9941.5
9943.5
9945.0
9947.0
9949.5
9950.0
9951.5
9952.5
9953.0
9954.0
9957.0
9958.5
9961.0
9963.5
9967.0
9968.0
9969.0
9972.5
9980.5
9981.0
9983.0
9984.0
9987.0
9989.0
9991.0
9992.0
9992.5
9998.5
10000.5
10005.0
10008.5
10012.5
10013.5
10014.0
10016.5
10022.5
10025.0
10026.5
10029.0
10029.5
10030.5
10031.5
10032.5
10033.5
10034.5
10035.0
10036.0
10037.5
9910.5
9920.5
9925.0
9936.5
9937.5
9940.5
9952.5
9958.5
9963.5
9966.5
9968.5
9972.5
9980.5
9983.0
9983.5
9990.5
9991.0
9991.5
9998.0
9999.5
10004.5
10008.5
10012.0
10016.0
10022.0
10026.0
10028.0
10028.5
10029.0
10030.0
10030.5
10031.5
10032.0
10033.0
9905.5
9907.5
9912.0
9919.5
9923.5
9935.5
9938.0
9938.5
9939.0
9941.5
9943.5
9945.5
9947.0
9948.0
9949.5
9950.0
9950.5
9951.0
9955.0
9957.0
9959.0
9961.5
9964.0
9964.5
9977.5
9982.5
9984.0
10007.5
10011.5
10012.0
10020.5
10028.5
10030.0
10038.5
10039.5
10041.0
10042.5
10046.0
10048.0
10054.5
10057.5
10060.5
10064.5
10067.0
10067.5
10070.0
10073.5
10074.0
10076.5
10078.0
10079.5
10086.5
10087.0
10088.0
10090.5
10095.5
10096.5
10097.5
10102.5
10104.5
10106.0
10106.5
10109.0
10112.0
10114.0
10119.0
10121.0
10123.0
10125.5
10132.0
10132.5
10133.0
10138.0
10142.0
10142.5
10165.0
$
REMARKS:
10032.0
10033.0
10041.0
10037.5
10046.0
10045.0
10054.0 10051.5
10057.5
10060.0
10059.0
10068.5
10067.5
10071.0
10074.5
10075.0
10077.0
10079.0
10079.5
10088.0
10088.0
10089.5
10091.0
10097.0
10098.0
10098.5
10103.5
10105.5
10107.5
10107.0
10108.0
10111.0
10112.5
10118.5
10121.0
10123.0
10124.0
10132.0
10132.5
10131.0
10136.0
10140.0
10140.5
10165.0 10165.0
PASS 3.
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
/ ??MATCH3A. OUT
/??MATCH3B. OUT
$
: BP EXPLORATION
: E- 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
i GRCH 2418 68 I GAPI
2 NPHI 2418 68 1 PU-L
3 FUCT 2418 68 1 CPS
4 NUCT 2418 68 1 CPS
5 TENS 2418 68 1 LB
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
mmmmmmm
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 38
Tape File Start Depth = 10165.000000
Tape File End Depth = 9370.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decOding summary:
Rep Code: 68 19094 datums
Tape Subfile: 4 332 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited Pass i gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: .5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
GRCH
2418
$
REMARKS:
CN
WN
FN
COUN
STAT
1, 2, 3
1, 2, 3
AVERAGED PASS.
GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3
PASSES.
$
: BP EXPLORATION
: E- 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
i GRCH CNAV 68 i GAPI
2 NPHI CNAV 68 i PU-L
3 FUCT CNAV 68 I CPS
4 NUCT CNAV 68 i CPS
4 4 35 725 65 1
4 4 35 725 65 1
4 4 35 725 65 1
4 4 35 725 65 1
16
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 32
Tape File Start Depth = 10165.000000
Tape File'End Depth = 9370.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 17503 datums
Tape Subfile: 5 55 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9380.0
2418 9389.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM
GR
CN
CCL
$
PULSE CODE MODULATOR
GAMMA RAY
COMPENSATED NEUTRON
CASING COLLAR LOC.
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
STOP DEPTH
10141.0
10150.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
.00
.000
11-SEP-94
FSYS REV. J001 VER. 1.1
1527 ll-SEP-94
10219.0
10141.0
9400.0
10140.0
1200.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
.000
10262.0
.0
PROD.FLUIDS+SEAWATER
.00
.0
.0
0
.0
.000
.000
.000
.0
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 2
FAR COUNT RATE HIGH SCALE (CPS): 402
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS) : 1050
TOOL STANDOFF (IN):
.0
REMARKS: PASS 1.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E- 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI
2 CNC 2418 68 1 PU-L
3 CN 2418 68 1 PU-L
4 LSN 2418 68 1 CPS
5 SSN 2418 68 1 CPS
6 CCL 2418 68 1
7 SPD 2418 68 1 F/MN
8 TTEN 2418 68 1 LB
9 TEN 2418 68 1 LB
4 4 19 991 67 5
4 4 86 720 65 6
4 4 31 149 96 6
4 4 27 466 87 5
4 4 28 122 23 5
4 4 79 150 21
4 4 65 866 87 0
4 4 31 402 87 0
4 4 31 402 87 0
_______
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 126
Tape File Start Depth = 10157.000000
Tape File End Depth = 9373.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 50465 datums
Tape Subfile: 6
Minimum record length:
Maximum record length:
201 records...
62 bytes
1006 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9381.0
2418 9389.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10146.0
10154.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSECODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER cuTs (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
LIMESTONE
.00
.000
ll-SEP-94
FSYS REV. J001 VER. 1.1
1629 ll-SEP-94
10219.0
10141.0
9400.0
10140.0
1200.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
.000
10262.0
.0
PROD.FLUIDS+SEAWATER
.00
.0
.0
0
.0
.000
.000
.000
.0
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 2
FAR COUNT RATE HIGH SCALE (CPS): 402
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
.0
REMARKS: PASS 2.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E - 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64 )
.0
.0
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API AP1 API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI
2 CNC 2418 68 1 PU-L
3 CN 2418 68 1 PU-L
4 LSN 2418 68 1 CPS
5 SSN 2418 68 1 CPS
6 CCL 2418 68 1
7 SPD 2418 68 1 F/MN
8 TTEN 2418 68 1 LB
9 TEN 2418 68 1 LB
4 4 19 991 67 5
4 4 86 720 65 6
4 4 31 149 96 6
4 4 27 466 87 5
4 4 28 122 23 5
4 4 79 150 21
4 4 65 866 87 0
4 4 31 402 87 0
4 4 31 402 87 0
m m emmmmm -- m ~mm --
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 126
Tape File Start Depth = 10162.000000
Tape File End Depth = 9378.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 48874 datums
Tape Subfile: 7
Minimum record length:
Maximum record length:
201 records...
62 bytes
1006 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9377.0
2418 9392.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10145.0
10154.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
ll-SEP-94
FSYS REV. J001 VER. 1.1
1712 ll-SEP-94
10219.0
10141.0
9400.0
10140.0
1200.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
.000
10262.0
.0
PROD.FLUIDS+SEAWATER
.00
.0
.0
0
.0
.000
.000
.000 -~
.0
THERMAL
LIMESTONE
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 2
FAR COUNT RATE HIGH SCALE (CPS): 402
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
.0
REMARKS: PASS 3.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E - 20 (24-05-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
.0
.0
* FORMAT RECORD (TypE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code'Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 cNc 2418 68 1 PU-L 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL' 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TTEN 2418 68 1 LB 4
9 TEN 2418 68 1 LB 4
4 19 991 67 5
4 86 720 65 6
4 31 149 96 6
4 27 466 87 5
4 28 122 23 5
4 79 150 21 1
4 65 866 87 0
4 31 402 87 0
4 31 402 87 0
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 126
Tape File Start Depth = 10161.000000
Tape File End Depth = 9377.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep COde: 68 81836 datums
Tape Subfile: 8
Minimum record length:
Maximum record length:
201 records...
62 bytes
1006 bytes
Tape Subfile 9 is type: LIS
94/ 9/22
O1
**** REEL TRAILER ****
94/ 9/23
01
Tape Subfile: 9 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 23 SEP 94 1:54p
Elapsed execution time = 20.82 seconds.
SYSTEM RETURN CODE = 0