Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout181-039Ima.~roject Well History File CoveOge XHVZE This page identifies those items that were not scanned during the initial pro'duction scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. L~. L- 0~(~ Well History File Identifier Organizing RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [3 Grayscale items: [] Poor Quality Originals: [] Other: NOTES: [] Diskettes, No. [] Other, No/'rype BY; BEVERLY ROBIN VINCENT ~ MARIA WINDY [] Maps: ~-- Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other Project Proofing ., BY; ~ROBIN VINCENT SHERYL MARIA WINDY Scanning Preparation BY: BEVERLY ROBIN Production Scanning Stage 1 VINCENT SHERY~WINDY BY: Stage 2 BY~ (scANNING IS COMPLETE AT THiS POINT UNLE~ SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE 1'O QUAUTY, GRAY$CAt. E OR COLOR IMAGES) PAGE COUNT FROM.SCANNED FILE: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: YES '~ NO BEVERLY~VINOENT SHERYL MARIA WINDY DATE;/'--/ IF NO IN STAGE t, PAGE(S) DISCREPANCIES WERE FOUND: YES NO Ill Illllllllll II Ill ReScanned (individual page [.~pecial a~et~tiotq.~ca~mlng completed) RESCANNED BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: IS~ General Notes or Comments about this file: Quality Checked 12/10102Rev3NOTScanned.wpd ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG No. of Completions 1a. Well Status: 0 Oil 0 Gas 0 Plugged 181 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: DIL / GR / SP, GR / SP / DIL / BHCS, GR / FDC / CNL / CAL, HDT, CBL / CCL / GR / VDL, Gyro, USIT CASING, LINER AND CEMENTING RECORD SEÏTINß'D~~<~D ,SETllN<?DEflTH'fVp, HQI.E;,> '"" . " ," ,,', , , Top', BQT1fOM ,:,ToÞ ,BorrOM 'SIZE';, "1 Cr;MENJINß RgÇORP , Surface 110' Surface 110' 36" 8 cu yds Concrete 30' 2699' 30' 2699' 17-1/2" 2627 cu ft Arcticset II 29' 9458' 29' 8465' 12-1/4" 1292 cu ft Class 'G', 130 cu ft AS I 8960' 10265' 8058' 9079' 8-1/2" 438 cu ft Class F' 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1743' SNL, 883' WEL, SEC. 06, T11N, R14E, UM Top of Productive Horizon: 4385' SNL, 1326' EWL, SEC. 05, T11N, R14E, UM Total Depth: 4829' SNL, 1478' EWL, SEC. 05, T11 N, R14E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664103 y- 5975313 Zone- ASP4 TPI: x- 666379 y- 5972720 Zone- ASP4 Total Depth: x- 666542 y- 5972280 Zone- ASP4 18. Directional Survey 0 Yes 181 No 22. CASING SIZE 20" X 30" 13-3/8" 9-5/8" Wt. P~RFf: . Insulated 72# 47# 26# GRADE, Conductor L-80 L-80 L-80 7" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD . '1 If.'..U 'E""~"Ìj St;¡~~'!! ~~."'. ,., 8 2.nO~i 26. Date First Production: Not on Production Date of Test Hours Tested 27. TuéÎNGRECORD SIZE DEPTH SET (MD) 5-1/2", 17#, L-80 8870' - 8921' 4-1/2", 12.6#, L-80 8921' - 9052' ACID; FRACTURE,CEMENT SQUEEZE, ETC. Zero Other 5. Date Comp., Susp., or Aband. 9/28/2004 6. Date Spudded 11/27/1981 7. Date T. D. Reached 12/13/1981 8. KB Elevation (ft): 60.5' 9. Plug Back\Depth (MD+ TVD) 10219 + 9045 10. Total Depth (MD+TVD) 10265 + 9079 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 24. , ~ 1b. Well Class: 181 Development 0 Exploratory 0 Stratigraphic 0 Service 12. Permit to Drill Number 181.;039 304-358 13. API Number 50- 029-20576-00-00 14. Well Name and Number: PBU E-20 15. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028304 17. Land Use Permit: TVD 25. DEPTH INTERVAL (MD) 9500' 8810' 8791' 20. Thickness of Permafrost 1900' (Approx.) AMQLI~T , PUI-LED PACKER SET (MD) 8890' AMOUNT & KIND OF MATERIAL USED P&A w/ 30 Bbls Class 'G', Sqz to 1000 psi Set EZSV Set Whipstock RBDMS BFL NOV 1 6 2004 0 RIG I N A L GAs-McF W A TER-B8l PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A PRODUCTION FOR 01l-B8l TEST PERIOD -+ Flow Tubing Casing Pressure CALCULATED...... 01l-B8l Press. 24-HoUR RATE""'" GAs-McF W A TER-B8l CHOKE SIZE GAS-Oil RATIO Oil GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach sePé3rate s~~e:!.jf necessary). Submit core chips; if none, state "none". ~. \¡F;. ~s None Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE NOV 1 2004 Gf 28. ) 29. ) FORMATION TESTS GEOLOGIC MARKERS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9464' 8470' None Shublik 9495' 8494' Ivishak 9544' 8533' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~<2/IAiQ. ~ Title Technical Assistant Date ll-ll-Olf PBU E-20 181-039 304-358 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Thomas Schaefer, 564-4685 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". SCANNED NOV 1. S 2004 Form 10-407 Revised 12/2003 Submit Original Only ) ) Well: Field: API: Permit: E-20A Prudhoe Bay Unit 50-029-20576-01-00 204-189 Accept: Spud: Release: Rig: 09/29/04 10/08/04 10/16/04 Nabors 2ES PRE-RIG WORK 09/25/04 RIH WI 41/2" X EQUAL PRONG NO CHANGE IN PRESSURE. LATCH STA # 2 @ 8595' SLM, OJ HITS UP TO 1200# S FOR A HOUR, TAP DOWN FOR A HOUR. 09/26/04 RU .125 WIRE AND EXTRA SECTION LUB. RUN 3.5" BELL GUIDE WI 2 1/2" JDC LOCATE AND SD 8572' SLM, POOH, RECOVER GO-DEVIL. RUN 3.5" BELL GUIDE W/ 21/2" JDC LOCATE AND SD ON FISH @ 8563' SLM JAR 45 MIN PULL FISH WITH DGLV #2. RUN 4.5" GR SD @ 8980' SLM, LOCATE PLUG, ATTEMPT TO PULL, SHEAR PIN POOH. PULL 4.5" XXN PLUG. RUN 3.615" CENT TEL WI SAMPLE BAILER. LOCATE TTAIL @ 9018' SLM, 22' CORR. TAG @ 10114' SLM, BAILER WAS EMPTY. 09/27/04 RIH WITH 2.5" BDN. FLUID PACK IA WITH 1% KCL AND TOP WITH DIESEL. LOAD AND KILL WELL WITH 1% KCL AND TOP WITH DIESEL. SAT DOWN WITH 2.5" NOZZLE IN OPEN POCKET OF GLM #2. POOH. MU AND RIH WITH 3.0" BDN. 09/28/04 RIH WITH 3.0" BDN. LOAD & KILL WELL W/ 1% KCL, DIESEL CAP. LAY 30 BBLS 15.7# CLASS G CEMENT FROM 10,125'. BUMP WHP UP TO 500 PSIG, HOLD FOR 30 MIN. WORK WHP UP TO 1000 PSIG, HOLD FOR 30 MINUTES. EST. 6 BBLS BEHIND PIPE. ESTIMATED CEMENT TOP @ 9500'. CLEAN OUT W/ 44 BBLS BIOZAN FROM 8830' TO 9200' CTMD AND CHASE TO SURFACE @ 80% WI XS 1% KCL. ALLOW IA TO U- TUBE DIESEL INTO TUBING. LEFT WELL SHUT-IN. RDMO. NOTIFIED PAD OPERATOR OF CONDITION. JOB COMPLETE. SCANNED NO\! 1. 8 200~, ) ) BP EXPLORATION Operations SummélryReport Page 1 ., Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-20 E-20 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Start: 9/27/2004 Rig Release: 10/16/2004 Rig Number: Spud Date: 11/27/1981 End: 10/16/2004 Date From-To Phase Description of Operations -------- 9/27/2004 00:00 - 07:00 7.00 MOB P PRE Cleaned pits and prepared for moving. Bridled up and secured service loops. Staged out camp, shops and pit module to OS-15 access road. Laid down derrick. Moved camp shops and pit module to E-pad. Staged rig module to OS-15 access rod. 07:00 - 10:00 3.00 MOB P PRE Wait on escort. Cleaned area around OS 15-26B 10:00 - 00:00 14.00 MOB P PRE Moved rig module to E-pad. Rig on pad at 23:50 hours. 9/28/2004 00:00 - 00:00 24.00 MOB N WAIT PRE Standby with rig while pre-decompletion work was completed. Cleaned and organized rig. Performed general maintenance. Bringing location to grade for rig placement. 9/29/2004 00:00 - 04:00 4.00 MOB N WAIT PRE Standby with rig. Raised area in front of well 6" to 8" for rig pad. Cleaned and organized rig and performed general maintenance while standing by. 04:00 - 05:30 1.50 MOB P PRE Laid down heculite and mats. Set wellhead equipment behind cellar. 05:30 - 08:30 3.00 MOB P PRE Moved camp, pit module and sub to location. 08:30 - 12:00 3.50 MOB P PRE Moved and spotted rig module over E-20. Laid down heculite and matts for pit module. Set in pit module. Spotted and hooked up camp. Built berm for cuttings tank. 12:00 - 15:30 3.50 MOB P PRE Held PJSM. Raised and pinned derrick. Unbridled. Rigged up floor and cellar. Spotted shop. Completed pre-spud checklist. 15:30 - 16:00 0.50 WHSUR P DECOMP Rig accepted at 15:30 hours. Held PSJM. 16:00 - 16:30 0.50 WHSUR DECOMP Installed secondary annular valve. 16:30 - 17:30 1.00 WHSUR P DECOMP Rigged up OSM lubricator. Pulled BPV. 17:30 - 18:00 0.50 KILL P DECOMP Rigged up circulating lines. 18:00 - 20:30 2.50 KILL P DECOMP Circulated out diesel freeze protect with clean seawater at 3 BPM with 100 psi. Well dead. Rigged down circulating lines. 20:30 - 21 :00 0.50 BOPSUR P DECOMP Installed TWC and tested from below with 1000 psi. 21 :00 - 00:00 3.00 BOPSUP P DECOMP Nippled down tree and adaptor flange. Installed double studded adaptor and BOPS. 9/30/2004 00:00 - 03:00 3.00 BOPSUF P DECOMP Filled BOP stack with water. Made up 5 1/2" test joint. Tested upper pipe rams, blind rams, manifold & valves, TIW valve, inside BOP & top drive to 250 psi low and 3500 psi high. Tested annular to 250 psi low and 2500 psi high. Rigged down test joint. BOP test witness waived by Chuck Scheve - AOGCC. 03:00 - 04:30 1.50 BOPSUP P DECOMP Rigged up lubricator. Pulled TWC. Rigged down lubricator. Cleared floor. 04:30 - 06:00 1.50 PULL P DECOMP Held PJSM. Rigged up Schlumberger to run string shot and chemical cutter. 06:00 - 08:00 2.00 PULL P DECOMP Ran in hole with string shot to 9052'. Shot interval from 8859' to 8871' to prepare for chemical cut. Pulled string shot. Made up chemical cutter. 08:00 - 10:30 2.50 PULL P DECOMP Ran in hole with 4 7/16" chemical cutter and cut 5 1/2" tubing at 8870' ELM. Pulled chemical cutter. Rigged down Schlumberger. 10:30 - 13:00 2.50 PULL P DECOMP Made up landing joint and screwed into tubing hanger. Drained stack and backed out lock down screws. Pulled tubing hanger to floor. PU - 185,000 Ibs. String weight - 175,000 Ibs. Laid down tubing hanger and landing joint. 13:00 - 14:00 1.00 PULL P OECOMP Rigged up 5 1/2" running equipment and spooling unit for control line. 14:00 - 16:30 2.50 PULL P DECOMP Laid down 5112" 17# 1-80 IBT-M tubing and spooled control line to control valve. Retrieved +/-2060' of stainless steel tubing, 26 Printed: 10/18/2004 9:55:35 AM SCANNEr) NO\! 1 8 2004 ) ) Page 2" BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-20 E-20 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Date From - To Hours Task Code NPT Phase ----- ---- - ---~._--- 9/30/2004 14:00 - 16:30 2.50 PULL P DECOMP 16:30 - 00:00 7.50 PULL P DECaMP 10/1/2004 00:00 - 01 :00 1.00 BOPSUF P DECOMP 01 :00 - 01 :30 01 :30 - 04:30 0.50 EV AL P 3.00 EV AL P DECOMP DECOMP 04:30 - 05:30 1.00 EVAL P DECOMP 05:30 - 10:00 4.50 EV AL P DECOMP 10:00 - 16:30 6.50 EV AL P DECaMP 16:30 - 17:30 1.00 EVAL P DECOMP 17:30 - 20:00 2.50 STWHIP P WEXIT 20:00 - 21 :00 1.00 STWHIP P WEXIT 21 :00 - 00:00 3.00 STWHIP P WEXIT 10/2/2004 00:00 - 01 :00 1.00 STWHIP P WEXIT 01 :00 - 08:00 7.00 STWHIP P WEXIT 08:00 - 08:30 0.50 STWHIP P WEXIT 08:30 - 09:30 1.00 STWHIP P WEXIT 09:30 - 12:00 2.50 STWHIP P WEXIT 12:00 - 12:30 0.50 STWHIP N RREP WEXIT 12:30 - 17:30 5.00 STWHIP P WEXIT 17:30 - 18:30 1.00 STWHIP P WEXIT 18:30 - 19:00 0.50 STWHIP P WEXIT 19:00 - 20:00 1.00 STWHIP P WEXIT 20:00 - 21:00 1.00 STWHIP P WEXIT 21:00 - 00:00 3.00 STWHIP P WEXIT SCANNE[! NO\ll 8 2004 Start: 9/27/2004 Rig Release: 10/16/2004 Rig Number: Spud Date: 11/27/1981 End: 10/16/2004 Description of Operations -----.-------- ~.-- - - "---._- clamps and 3 stainless steel bands. Completed pulling out of hole with 5 1/2" 17# L-80 IBT-M tubing. Recovered a total of 211 joints, 20.22' cut joint, 12 GLM, control valve and XA nipple. Made up 4" test joint and set test plug. Tested upper and lower variable bore rams, dart valve and TIW to 250 psi low and 3500 psi high. Tested annular to 250 psi low and 2500 psi high. Rigged down test joint. Ran and set wear bushing. Held PJSM. Rigged up Schlumberger. Ran in hole with junk basket and 81/2" gauge ring. Tool initially stopped at +1- 8770'. Worked down to 8850'. WLM. (+1- 20' above tubing stub. Ran correlation strip for US IT tool. Pulled junk basket. Recovered pieces of possible banding material and cement. Correlation log showed Junk basket on top of tubing stub. Changed out wireline heads and tools. Tested US IT tool on surface. Ran in hole with US IT tool to 8865'. Logged from 8825' to surface. Made up gyro tool and ran in hole. Ran gyro survey from 8850' to surface. Held PSJM. Made up 9 5/8" EZSV. Ran and set 9 5/8" EZSV at 8810'. (4' above casing collar). Cleared floor. Tested 9 5/8" casing to 3500 psi for 30 minutes. Test was good with no seepage in cellar. Made up 9 5/8" whipstock with starter mill, 8" lower string mill and 8 1/2" upper string mill. Picked up MWD. Scribed MWD and uploaded. Made up UBHO, 9-DCS &1 HWDP. Surface tested MWD. Picked up 21 joints of 5" HWDP. Run in hole with whipstock assembly, picking up 4" DP to 8791'. Orient whipstock to 86 deg LHS. Tagged EZSV at 8791' DPM. Set anchor with 25K down. Shear lug with 40K down. TOW- 8767'. Pump high-viscosity pill and displaced the well over to 10.6 ppg LSND drilling fluid. Milled window from 8767' to 8772'. Top drive locked up - overheating. Trouble shoot top drive. Milled window from 8772 to 8783 and 12' of new hole to 8795'. PU - 225k Ibs, SO - 160k Ibs, RT - 185k Ibs, off btm torque - 11,000, on btm torque - 15,000 at 80 RPM. Circulated at 500 GPM @ 2150 psi. TOW - 8767' and BOW - 8783'. Pumped sweep. Reamed and back reamed thru window. Worked pipe thru window wlo rotating - window is clean. Circulated bottoms up. Ran FIT to equivalent of 12.0 ppg MW with 10.6 ppg mud and 575 psi. Monitor well- okay. Blew down surface equipment. Laid down 2 singles. Serviced rig and top drive. Inspected oil lube filters. Found large metal shavings in filters which appeared to be from bearings.. Slipped and cut 100' of drilling line. Pulled out of hole laying down 4" DP. Printed: 10/18/2004 9:55:35 AM ') ) BP EXPLORATION Operations Summary Report Page 3 .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-20 E-20 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Start: 9/27/2004 Rig Release: 10/16/2004 Rig Number: Spud Date: 11/27/1981 End: 10/16/2004 Date From - To Hours Phase Description of Operations -- -- -. -- - --._---- -- 1 0/3/2004 00:00 - 03:00 3.00 STWHIP P WEXIT Continued to pull out of hole. Laid down 4" DP and stood back HWDP. 03:00 - 04:00 1.00 STWHIP P WEXIT Laid down DCS and bumper sub 04:00 - 04:30 0.50 STWHIP P WEXIT Down loaded MWD and laid down. 04:30 - 05:00 0.50 STWHIP P WEXIT Broke out and laid down milling assembly. Upper mill was full gauge. 05:00 - 06:00 1.00 STWHIP P WEXIT Pulled wear bushing. Flushed out metal shavings from inside BOP stack. Re-ran wear bushing. 06:00 - 07:30 1.50 STWHIP N RREP WEXIT Ran in hole with HWDP. Made up RTTS and set at 50'. Tested RTTS w/1 000 psi - okay. Laid down running tool. 07:30 - 11 :00 3.50 STWHIP N RREP WEXIT Rigged down floor. Removed Bails and elevators. Broke saver sub, IBOP and swivel packing connections. 11 :00 - 12:00 1.00 STWHIP N RREP WEXIT Bridled up. 12:00 - 15:00 3.00 STWHIP N RREP WEXIT Drained lube oil from top drive. Removed kelly hose, electric service loop and block links. Lowered pipe chute. 15:00 - 16:00 1.00 STWHIP N RREP WEXIT Held PJSM. Laid down derrick. Secured blocks and drilling line. 16:00 - 17:30 1.50 STWHIP N RREP WEXIT Held PJSM with crane crew. Removed top drive and secured to transport trailer. 17:30 - 19:30 2.00 STWHIP N RREP WEXIT Raised derrick & pipe chute. Bridled down Hung off blocks. 19:30 - 00:00 4.50 STWHIP N RREP WEXIT Removed draw works guards, brake band equalizing bar, pin and bushing for inspection. Prepared cellar for paint and performed general housekeeping. 10/4/2004 00:00 - 00:00 24.00 STWHIP N RREP WEXIT Re-installed brake band equalizer bar. Tore down top drive and found the main thrust bearing had failed. Washed out metal shavings and cleaned parts. New parts for top drive have arrived in Deadhorse. Performed general housekeeping, painting and maintenance while overhauling top drive. 10/5/2004 00:00 - 00:00 24.00 STWHIP N RREP WEXIT Performed general housekeeping, painting and maintenance while overhauling top drive. Top drive cleaned and reassembled. Chip found in main gear. Continue topdrive overhaul while order new bull gear. 10/6/2004 00:00 - 00:00 24.00 STWHIP N RREP WEXIT Perform general maintenance, welding and painting on rig. Installed main drive gear on top drive and continued overhaul. 1 on /2004 00:00 - 08:00 8.00 STWHIP N RREP WEXIT Performed general housekeeping, painting and maintenance while overhauling top drive. Top drive reassembled. Finished top drive overhaul and off rig checks. Laid down derrick. 08:00 - 09:30 1.50 STWHIP N RREP WEXIT Spotted crane. Picked up and set in top drive. 09:30 - 11 :00 1.50 STWHIP N RREP WEXIT Raised derrick and hung block links. 11 :00 - 12:00 1.00 STWHIP N RREP WEXIT Bridled down. 12:00 - 17:30 5.50 STWHIP N RREP WEXIT Made up kelly hose. Reconnected service loops. Tied back bridle lines. Filled gear case. Installed blower hose and bales. Welded bracket on top drive. 17:30 - 21 :00 3.50 STWHIP N RREP WEXIT Energized top drive and test functioned. Adjusted clamps on link tilt. Reassembled grabber foot. Torqued up saver sub connections and clamps. Tightened wash pipe unions. 21 :00 - 22:00 1.00 STWHIP N RREP WEXIT Circulated through top drive and rotated at 80 RPM for 15 minutes, 100 RPM for 15 minutes and at 156 maximum RPM for 10 minutes. Pressure tested wash pipe packing to 3500 psi. 22:00 - 23:30 1.50 STWHIP N RREP WEXIT Held PJSM. Made up RTTS retrieving tool and TIW valve. Engaged packer at 50', checked for pressure and released packer. Broke out and laid down packer. Hole was full. 23:30 - 00:00 0.50 STWHIP N RREP WEXIT Pulled out of hole with HWDP. 10/8/2004 00:00 - 01 :00 1.00 DRILL P INn Made up Directional BHA #2 with bit, motor and MWD. SCANNE.[) NO\! 1 8 ¿UU4 Printed: 10/18/2004 9:55:35 AM ) ) Page 4 .. BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-20 E-20 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 2ES Date From -To HoUrs --_..u_-.-_.-_._..--- -.,------.--------.-- 10/8/2004 00:00 - 01 :00 1.00 DRILL P INT1 01 :00 - 03:00 2.00 DRILL P INT1 03:00 - 08:30 5.50 DRILL P INT1 08:30 - 09:30 1.00 DRILL N RREP INT1 09:30 - 11 :00 1.50 DRILL P INT1 11 :00 - 11 :30 0.50 DRILL N RREP INT1 11 :30 - 12:00 0.50 DRILL P INT1 12:00 - 00:00 12.00 DRILL P INT1 10/9/2004 00:00 - 04:30 4.50 DRILL P INT1 04:30 - 05:30 1.00 DRILL P INT1 05:30 - 06:30 1.00 DRILL P INT1 06:30 - 07:30 1.00 DRILL P INT1 07:30 - 08:00 0.50 DRILL P INT1 08:00 - 09:00 1.00 DRILL P INT1 09:00 - 10:00 1.00 DRILL P INT1 10:00 - 10:30 0.50 DRILL P INTi 10:30 - 11 :00 0.50 DRILL P INT1 11 :00 - 12:30 1.50 DRILL P INTi 12:30 - 16:30 4.00 DRILL P INT1 16:30 - 18:00 1.50 DRILL P INT1 18:00 - 19:30 1.50 DRILL P INTi 19:30 - 20:30 1.00 CASE P 20:30 - 22:00 1.50 CASE P 22:00 - 22:30 0.50 CASE LNR1 22:30 - 00:00 1.50 CASE LNR1 10/10/2004 00:00 - 03:30 3.50 CASE LNR1 03:30 - 04:00 0.50 CASE LNR1 04:00 - 04:30 0.50 CAS LNR1 04:30 - 05:00 0.50 C LNR1 05:00 - 05:30 0.50 ASE LNR1 05:30 - 06:30 P LNR1 :'::;CANN[[~ NOV t 8 200lJ Start: 9/27/2004 Rig Release: 10/16/2004 Rig Number: Spud Date: 11/27/1981 End: 10/16/2004 Description of Ope tat iOns . Oriented and uploaded MWD. Picked up jars and ran in hole with HWDP. Tested MWD. Ran in hole, picking up 4" DP to 8646'. Filled pipe and broke circulation every 3000'. Stood back DP from 8646' to 7710'. Checked out top drive. Lube oil pump not maintaining correct oil pressure. Picked up 4" DP from 7710' to 8739'. Broke circulation and oriented tools to 80 degrees left. Changed out lube oil pump on top drive. Worked thru window from 8767' to 8783'. Reamed from 8783' to 8795'. PU - 215k Ibs. SO 150 k Ibs. Had 2500 psi oft bottom and 2750 psi on bottom at 516 GPM. Directionally drilled and slide from 8795 to 9218 (8305 I VD). Dropping angle and turning left. Directionally drilled 8 1/2" hole from 9218 to 9393. Circulate bottoms up for samples. Directionally drilled 8 1/2" hole to 9425'. Circulate bottoms up for samples. Pulled out of hole from 9425' to 8767'. Completed MAD Pass from 8767 to 85 to 350 FPH. Slipped and cut drilling line. Serviced rig and top drive. Ran in hole from 8567' to 25'. No problems. Pumped high viscosit weep at 540 GPM and 2950 psi. Flow checked well. Spo ö liner-running pill on bottom. Pulled out of h to window. Flow checked well. Pumped dry job. Contin pulling out of hole to HWDP. Laid do HWDP, jars and DCS. Flus ä out MWD and downloaded. Laid down MWD, motor a bit. Cleared floor. eld PJSM. Rigged up to run 7" liner. Made up 7" 26# float equipment. Checked floats. Picked up 19 joints of 7" 26# L-80 BTC-M and L TC-M liner. Made up 7" X 9 5/8" HMC liner hanger and ZXP Liner top packer w/ running tool. Ran in one stand of DP and circulated liner volume. Ran in hole with 7" liner on 4" DP, filling pipe every 10 stands. Run in hole with 7" liner to 8767. Circulated liner and DP volume. Run in hole from 8767' to 9401'. Made up cementing head, manifold and lines. Tagged bottom at 9425'. Staged pump up to 7 BPM w/1400 psi. Circulated bottoms up. Rigged up Schlumberger. Pumped 5 BBLS of water. Pressure tested lines to 4500 psi. Flushed water from lines. Pumped 25 BBLS of 11.6 ppg Mud Push II Spacer followed by 38 BBLS (183 sxs) of 15.8 class G cement with .4% 0167, .3% 065, .2% 046 and .03% B155. Washed cement from lines and dropped dart. Displaced cement with 10.6 ppg mud using Dowell. Latch plug at 81.6 BBLS and bumped plug at 113 BBLS with 4000 psi and set hanger. Bled oft pressure. Floats held. Set down 45K Ibs and rotated to release tool. Pressured up to 1000 psi and Printed: 10/18/2004 9:55:35 AM Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well ffl.. '~ DS15-13A I <il.... E-20 ~~I{-O Þ1, 8-33A l£);; ..{~SI-05 <L2_32 M1'" L2-32 ¡ '!r 1 L2-32 L2-32 2i:JJ ...(E-400 IrA W-400 -400 Job# 10913854 10866600 10861918 10830793 10687661 10672377 10912982 10687650 40009731 10621738 10621779 ¡ ør-039 10/21/04 NO. 3238 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Robin Deason 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay ~ Log Description Color Date Blueline Prints CD 10/04/08 1 10/01/04 1 06/21/04 1 1 04/25/04 1 1 01/02/04 1 1 04/28/04 1 1 09/06/04 1 1 09/22/03 1 1 10/21-26/03 2 1 10/28/03 6 1 05/05/04 SCMT USIT MCNL RST-SIGMA RST-SIGMA RST-SIGMA RST -SIGMA RST-SIGMA OH EDIT MWD DATA OH EDIT AIT/BHC/PEXl6 ARM CALIPER USIT ~' PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: /7z¡b1 SCANNED DEC 2 82004 Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage, AK 99503-2838 ATTN: Be~ ~ /r Receive~¡~ [Fwd: Re: E-20A A'pplication for Sundry Approval] Subject: [Fwd: Re: E-20A Application for Sundry Approval] From: John Norman <john - norman@admin.state.ak.us> Date: Fri, 01 Oct 2004 11 :22:06 -0800 -------- Original Message -------- Subject:Re: E-20A Application for Sundry Approval Date:Fri, 01 Oct 2004 11 :21 :38 -0800 From:John Norman <John Nonnan(â!admin.state.ak.us> Organization:State of Alaska To:Winton Aubert <winton aubert(â!admin.state.ak.us> References :<02AB 14 FCB5BF8B488FE8A28E993 62A 13011 ODABD(â!bp 1 ancex002. bp l.ad. bp.com> <4154A 194.8030 1 (â!admin.state.ak.us> Winton be sure a hard copy of this gets into the file--best way is to cc: Jodyand she will insure file is up-to-date. Thanks, John Winton Aubert wrote: Thomas, This confirms AOGCC's verbal approval to corrmence sidetrack preparations on \/\.ell PBU E-20 (PTD 181-039), as detailed in the attachrrents. This Form 10-403 approval is valid through Step 9. of "Rig Operations", during \Ahich the BOPE test frequency is seven days. An approved Form 10-401 is required br sidetrack well E-20A. Please submit required documentation as soon as possible. Winton Aubert AOGCC 793-1231 Schaefer, Thomas J (CONTRACT PROFESSIONALS) wrote: Winton, As I mentioned on the phone, the well preceding the E-20A is experiencing dif ficulties that might make it impossible to move onto it by Monday. For that reason we are trying to get E-20A ready in case the problem s are not resolved. To that end I am attaching the supporting docum ents for the E-20A so that you might review them and verbally endorse E-20 abandonm ent for this weekend. I will also fax the schematics in case you cannot open the Canvas files. Thank you for your cooperation. Regards, Thomas Schaefer Alaska Drilling & Wells 907 564-4685 Office 907564-4040 Fax 907 748-2883 Cell 10f2 SCANNED OCT 0 9 2004 10/1/2004 1:26 PM [Fwd: Re: E-20A Application for Sundry Approval] 20f2 ì I I <;<E-20 Pre-rig ZIP» «E-20 Two-string Proposed.ZIP» «E-20ZIP» «E-20A Sundry : I I Application.ZIP» John K. Norman <John Norman(â!admin.state.us> Commissioner Alaska Oil & Gas Conserv ation Commission SCANNED OCT 0 9 2004 10/1/2004 1:26 PM ,,--., ~ ~1r~1rŒ (ID~ ~~~~æ~ AI1ASIiA OIL AlQ) GAS CONSERVATION COMMISSION / I f / , ì ffiA~~M~KOWS~GO~RNOO 333 W. ]fH AVENUE. SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279.1433 FAX (907) 276-7542 Bill Isaacson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 1 YJi-D31 Re: Prudhoe Bay E-20 Sundry Number: 304-358 Dear Mr. Isaacson: Enclosed is the approved Application for Sundry Approval relating to the above- referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. BY ORDER OF THE COMMISSION DATED this Hday of September, 2004 Enc!. '#'J'4{4;: "It. ((£.';>°1 ~ ~ RECEIVED SEP 2 4 2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 Alaska Oil & Gas Cons. Commission . 1. Type of Request: II Abandon 0 Repair Well II Plug Perforations 0 Stimulate 0 Other 0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well 2. Operator Name: 4. Current VYell Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. !HI Development D Exploratory 181-039 / 3. Address: D Stratigraphic D Service 6. API Number: / P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20576-00-00 7. KB Elevation (ft): 60.5' 9. Well Name and Number: PBU E-20 /' 8. Property Designation: 10. Field / Pool(s): ADL 028304 Prudhoe Bay Field / Prudhoe Bay Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10265 9079 10219 9045 None None Casino I ANoIth SiZe MD TVD Borst COllapse Structural - 110' 20" x 30" 110' 110' SurfacA 2699' 13-3/8" 2699' 2699' 5380 2670 .. 9458' 9-5/8" 9458' 8465' 6870 4760 P liner 1305' 7. 8960' - 10265' 8058' - 9079' 7240 5410 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: T Tubing MD (ft): 10027' - 10135' 8902' - 8983' 5-112',17# x 4-1/2',12,6# L-80 9052 Packers and SSSV Type: 9-5/8. Baker SAB Packer; Packers and SSSV MD (ft): 8890' 5-1/2. Otis SSSV Landing Nipple 2064' 12. Attachments: 13. Well Class after proposed work: !HI Description Summary of Proposal D BOP Sketch D Exploratory !HI Development D Service D Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: / Commencing Operations: October 1, 2004 J DOil DGas D Plugged !HI Abandoned 16. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Thomas Schaefer, 564-4685 Printed Name Bill Isaacson Title Senior Drilling Engineer Prepared By Name/Numbe~ Sianature Phone 564-5521 Date Terrie Hubble, 564-4628 , COmmisSion u.. OnlY. "" I Sundry Number: .30tj-3)f? Conditions of approval: Notify Commission so that a representative may witness D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance Other:Te~~ ßorE {o ~ÇOD }?~:; 1e~t Gv~6LLévl~ ¡ 'J çf!"¡ev"- clt4z( cLui/t't1 CV¡)j JW ¡j e C/4 ÅP tll'ú I/t J ¡:t; v V"'- 1(/ . 40 t yJ¿:Ú LV(' r-e J ~ ý ~ ¿ ip h¿:--f k /ÞVÎl{ E ~ 'lv 4- . Su"'OQ""'" F~' . /; - 4 0 '7 ' fII)MS BF L SEP 2 7 7004 9iÞ1í/)tf Approved By. -I .} V ~ APPROVED BY COMMISSIONER THE COMMISSION Date Form 1 0-403 Revis~6/2 ~ '-- Stj5mit In t>uplicate )F(J . v ORIGINAL ~ ~ p G~/N~æ To: Winton Aubert - AOGCC Date: September 22, 2004 From: Thomas Schaefer - BPXA GPB Rotary Drilling Subject: Reference: E-20 Application for Sundry Approval - P&A for Sidetrack Operations API # 50-029-20576-00 Approval is requested for the proposed P&A of PBU well E-20. In October 1999 E-28A, a new sidetrack, was put on production. E-20 is twinned with E-28A. E-28A is a full time well that produces into the Low Pressure (LP) line. E-20 produces into the High Pressure (HP) line. Because of this incompatibility, and the fact that E-28A is a much better well, E-20 cannot compete. Anyon-time E-20 had during 2000 and 2001 is due to the fact that it temporarily supplied PBGL to E-27A. E-20 has been shut-in since April 2001 to allow E-28A to produce without competition. E-20 has produced -14.49 million barrels of oil, 70.956 bcf gas, and negligible water. E-20 is a conventional, vertical well that is currently shut in due to high GOR, tubing/lA communication, and inability to compete with its twin (E-28A). E-20 has had a GSO squeeze that was successful, however because of where the GOC is picked (just 5' above the top set of perforations) and the absence of any shale barriers, a second cement squeeze would most likely be unsuccessful at shutting off the gas and lowering the GOR. Because of this, there are no viable remediation options available to this well. Since it is shut in, E- 20 adds minimal to zero value to field production. This new sidetrack would give opportunity to increase additional recovery potential within Zone 1 B/2A of the E-Pad area. To preserve future coiled tubing opportunities the well will be completed by cementing and perforating a 4%". The sidetrack is currently scheduled for Nabors rig 2ES, beginning around November 1 st, 2004, after the completion of the J-23A sidetrack and summer maintenance. The pre-rig work for this sidetrack will begin at the Well's Group earliest convenience after sundry approval. Current Condition: ./ E-20 has been shut in since April 2001 to allow E-28A to produce without competition. ./ Failed MITIA 4/15/01. LOL run indicated hole in tubing near surface. ./ Left XXN plug w/ fill extension in XN nipple at 8970' 4/24/01. Plug did not pass pressure test. ./ Confirmed badly corroded tubing with Kinley caliper log 5/13/01. ./ Passed PPPOT-IC to 3000 psi and tubing to 5000 psi on 8/16/04 ./ Tubing head LOS: 2 are frozen in out position. Will not move with 1200 ft-Ibs. ./ CMIT TXIA performed to 2,500psi, o.k. Failed MITOA. 9/4/04 Scope Pre-Ria Work: 1. Function all tubing hanger and 9 5/8" casing pack-off lock down screws and verify free movement. Completely back out and check each lock down screw for breakage; check one at a time. 2. R/U slick-line. Dummy off any live GLM. 3. Pull the tubing plug from the XN nipple at 8970'. 4. Fluid pack the tubing and the tubing X 9 5/8" annulus as necessary for abandonment plug. 5. R/U coil tubing. RIH and P&A the 7" liner and open perforations with at least -k4bbls (10% excess) of 15.8ppg class 'G' slurry. Leave cement top at 9,800'md. ~ vJ6k- 6. Pressure test against the cement plug to 3,500psi. 7. R/U slick-line. Drift the 5 %" tubing and tag TOC. Confirm sufficient clearance for the 5 %" tubing chemical cutter (4 7/16" 0.0.) to the planned cut depth of -8,875'. E-20A Application for Sundry ~ ~ 8. R/U E-line. RIH wI a 4 7/16" chemical cutter. Cut the 5 W' tubing -8,875' or in the center of the first joint above the packer. 9. Displace the well to clean seawater by circulating down the tubing through the tubing cut until clean seawater returns to surface. Freeze protect to -2,100' MD with diesel. 10. Bleed casing and annulus pressures to zero. 11. Set a BPV and test to 1000 psi from tubing annulus. Secure the well. Level the pad as necessary. RiCl Operations: 1. MI I RU Nabors rig 2ES. 2. Circulate out diesel freeze protection and displace the well to seawater. Set BPVfTWC. 3. Nipple down tree. Nipple up and test BOPE to 3,500psi. Pull BPVfTWC. 4. Pull 5-1/2" tubing from above pre-rig cut at -8,875'. 5. RIH wI 8 W' gauge ring I junk basket with gamma ray/CCL to top of tubing stub. Log casing from tubing stub to surface shoe at 2699' 6. Run USIT from tubing stub to surface. 7. MU 9 5/8", 47# bridge plug on e-line with CCL. RIH and set as required to allow for an 8800' whipstock KOP, (set as needed to avoid cutting a casing collar). POOH. RD e-line. 8. Pressure-test the 9 5/8" casing to 3,500psi for 30 minutes. Record test.. . ( 9. Perform to 'ob on conductor x 13 3/8" annulus. T~ I;, 10 ,- 4o?; Ovf;J &J yo 1/ ~ , 10. P/U and RIH with 9 5/8"" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired, and set on bridge plug. Shear off of whip stock. 11. Displace the well to 10.6 ppg LSND based milling fluid. Completely displace the well prior to beginning milling operations. 12. Mill window in 9 5/8" casing at :!: 8,800' MD, plus approximately 20' beyond middle of window. Circulate well bore clean. 13. Pull up into 9 5/8" casing and conduct an FIT to 12.0 ppg EMW. POOH. 14. M/U 8 W' Dir/GR/Res assembly. RIH, kick off and drill the 81/2" intermediate section to the top of the Sag River, per directional proposal. Circulate well clean, short trip to window. POOH. 15. Run and cement a 7",26.0#, L-80 intermediate drilling liner. 16. Test the 9 5/8" casing X 7" liner to 3,500psi for 30 minutes. Record the test. 17. Run and cement a 7" tieback from drilling liner to surface. 18. ND BOP, cut casing, set slips and packoff. 19. Install new tubing spool and NU and test BOPs. 20. M/U 6 1/8" Dir/GR/Neu/Den/ABI assembly. RIH to the landing collar. 21. Drill out the 7" liner float equipment and cement to the shoe. 22. Displace the well to 8.4 ppg Flo-Pro drilling fluid. 23. Drill out the 7" shoe plus drill -20' new formation; pull up into the shoe and conduct an FIT to 10.0ppg EMW. Drill ahead to TD as directed by wellsite geologist. 24. Circulate, short trip, spot liner running pill, POOH. 25. Run and cement a 4 W', 12.6#, L-80 solid production liner. POOH UD all drill pipe. 26. R/U and run 41/2",12.6#, 13Cr-80 completion tubing. Land the tubing and RILDS. 27. Set a TWC and test to 1000 psi 28. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi. 29. Reverse circulate inhibited seawater to the packer depth. Set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test. 30. Shear the DCK valve and freeze protect the well to -2,100'. Secure the well. 31. Rig down and move off. Post-RiCl Work: 1. Pick perfs from LWD log. RIH with 2 7/8" perf guns and perforate:!: 30'-40'. 2. Install well house and instrumentation 3. MI I RU slick-line. Pull the ball and rod I RHC plug from landing nipple below the production packer. Install gas lift valves. 4. POP well to test unit until cleaned up. Estimated Pre-rig Start Date: Estimated Spud Date: 10101/04 11/01/04 Thomas Schaefer Operations Drilling Engineer 564-4685 E-20A Application for Sundry TREE ¡= 6" erN ~ E-20 WELLHEAD = FMC ACTUATOR = OTIS KB. ELEV = 60.54' BF. ELEV = 32.01' KOP= 3000' Max Angle = 42 @ 10100' Datum MD = 9971' DatumlVD= 8800' SS 13-3/8" CSG, 72#, L-80, 0 = 12.347" 2699' Minimum ID = 3.725" @ 900S' 4-1/2" OTIS XN NIPPLE 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" 1 8890' I TOP OF 4-1/2" TBG I 8923' I TOP OF 7" LNR 1 4-1/2" TBG, 12.6#, L-80, .01522 bpf, 0 = 3.958" H 9-5/8" CSG, 47#, L-80, ID = 8.681" 1 9052' PERFORATION SUMMARY REF LOG: SWS BHCS ON 12/12/81 ANGLE AT TOP PERF: 42 @ 9930' Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DATE 2-5/8" 8 9930-9940 S 06/28/88 2-5/8" 8 9954-9996 S 06/28/88 2-5/8" 8 10011-10027 S 06/28/88 2-5/8" 4 10027-10046 0 07/14/88 2-5/8" 8 10046-10060 S 06/28/88 2-5/8" 4 10060-10114 0 07/14/88 2-5/8" 4 10125-10135 0 07/14/88 I PBTDI 10262' 10219' I 7" LNR. 26#, L-80, 0.0383 bpf, ID = 6.276" 1 . I I I SAF~NOTES: 8966' -14-1/2 OTIS X NIP, 0=3,813" 1 9008' -14-1/2" OTIS XN NIP, ID = 3.725" I H4-1/2" BAKER TBG TAIL I 9051' 9040' H ELMD TT LOGGED 07/14/88 I 9911' -1MARKERJOINT 1 2064' ST tI.I) lVD 12 3006 2955 11 5150 4794 10 6302 5746 9 6453 5873 8 7076 6392 7 7227 6518 6 7616 6848 5 7754 6966 4 8152 7312 3 8307 7445 2 8612 7708 1 8760 7835 8826' 8890' 8921' DATE REVBY COMMENTS DATE REVBY COMMENTS 12/17181 ORIGINAL COMPLETION 01/24/01 SIS-QAA CONVERTED TO CANV AS 02/27/01 SIS-LG FINAL 10/04/01 RNITP CORRECTIONS -15-1/2" OTIS SSSV LAND NIP, 0 = 4.562" I GAS LFT MANDRELS DEV lYPE VLV LATCH 10 OTIS RA 35 OTIS RA 33 OTIS RA 33 OTIS RA 34 OTIS RA 34 OTIS RA 31 OTIS RA 31 OTIS RA 31 OTIS RA 31 OTIS RA 30 OTIS RA 31 OTIS RA PORT DATE -15-1/2" OTIS XA SLDING SLY, ID = 4.562" I -1 BAKER SABR PACKER W/ SBR, 10=3.813"1 -15-1/2" X 4-1/2" XO I PRUDHOE BAY UNIT WELL: &20 PERMrrNo: 181-0390 API No: 50-029-20576-00 SEC6, T11N, R14E BP Exploration (Alaska) , TREE = 6" erw ~ WELLHEAD = FMC ACTUATOR = OTIS KB. ELEV = 60.5' BF. ELEV = 28.5' KOP= 3000' Max Angle = 42 @ 10,100' Datum MD = 9971' Datum TVD = 8800' SS 1::-20 Pre-rig . Minimum ID = 3.725" @ 9008' 4112" OTIS X NIPPLE 113-318" CSG, 72#, L-80, 10= 12.347" I 2699' H 8,875' 1 I Pre-rig chem cut 51/2" tubing I TOP OF 7" Lt\R I 14-1/2" TBG, 12.6.#, 13-CR. .0152 bpf, ID = 3.958"1 9052' 9-518" CSG, 47#, L-80, ID = 8.681" I ~ .' ¡j' I Pre-rig cement P&A plug 9800' . II ft 'Ii ~ .. ft' ... .. , ." 11\ II . I PBTD H 10219' I 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" H 10262' I I :~NOTES: 2064' --i5-1/2" OTIS SSSV LAND NIP, ID = 4.562" I GAS LIFT MANDRa.S DEV TYPE VLV LATCH PORT DATE 10 OTIS RA 35 OTIS RA 33 OTIS RA 33 OTIS RA 34 OTIS RA 34 OTIS RA 31 OTIS RA 31 OTIS RA 31 OTIS RA 31 OTIS RA 30 OTIS RA 31 OTIS RA ST MD TVD 12 3006 2955 11 51504794 10 6302 5746 9 6453 5673 6 7076 6392 7 7227 6518 6 7616 6848 5 7754 6966 4 8152 7312 3 8307 7445 2 8612 7708 1 8760 7835 --i5-1/2" OTIS XA SLIDING SLV, ID = 4.562" I H BAKER SABR PACKER WI SBR, Ð=3.813" I --i5-1/2" X 4-1/2" XO I 8890' 8921' "4-1/2 OTIS X NIP, ID = 3.813"' H4-1/2" OTIS XN NIP, ID = 3.725" I 9008' H4-1/2" BAKER TBG TAL 1 9051' H EL MHTLCX3GED 7/14/88 H M6.MR JOINT I I 9040' 9911' FffiFCRA. TICJ'. SlMv'ARr' REF LOO: &NS BI-CS ()\. 12/12/81 AfG..EA T TOP ÆRF: 42 @ 9930' f\bte: ~er to A'oduction œ for historical perf data SIZE SR= INTffiV AL Q:>nISqz OA.lE 2518" 8 9930-9940 Sqz 06128188 2518" 8 9954-9996 Sqz 06128188 2518" 8 10011-10027 Sqz 06128188 2518" 4 10027-10046 QJn 07/14/88 2518" 8 1 0046-1 0060 Sqz 06128/88 2518" 4 10060-10114 QJn 07/14/88 2518" 4 1012~10135 QJn 07/14/88 OA.TE Æ:V BY CDvMNTS OA.TE Æ:V BY CDvMNTS 12/17/81 œlGNA.L CD\REl"'IGJ 01/24/01 CDNERTID TO CAtfJ AS 02127/01 SlS-LG FML 02127/01 SlS-LG c:æREC1lONS 08127/04 TJS A'e-rig wark for Sidetrack FRDŒ BA Y LNT IJIAìL: 6-20 ~ f\b: XXX-XXXX AA f\b: 50-029-20576-00 SEC6, T11N, R14E 8P exploration (Alaska) TREE"" 6" GrN WELLHEAD = FMC ACTUATOR = OTIS KB. ELEV - 60.5' BF, ELEV = 28,5' KOP= 8800' Max Angle - 31.5 @ 8820' Datum MD = 10134' Datum TVD - 9192' 13-3/8" CSG, 72#, L-80, D = 12.347" TOG /' E-2tJA Proposed I SA~!NOTES: -14-1/2" X NIP, ID = 3,813" PORT DA TE ST MD 4 3414 3 6184 2 7964 1 9295 H -4,400' 1 Minimum ID = 3.725" @ 4-1/2" OTIS XN NIPPLE 41/2" 12.6# 13Cr80 BTC-M (3.958" ID) 17" 26# L-80 Tieback Liner (6,276" ID) 1-1 8640' 17" 26# L-80 Drilling Liner (6.276" ID) H TOP OF 7" LNR 9-5/8" CSG, 47#, L-80, ID = 8.681" I I Pre-rig cement P&A plug 8640' I 8800' H 9 5/8" Window I 19,182' H41/2"XNipple(3.813"ID) I I 9,197' 1-17" x 41/2" Baker 5-3 Packer 1 1 9,217' H4 1/2" X Nipple (3.813" ID) I 1 9,232' H4 1/2" XN Nipple (3.725" ID) I I 9,242' H4 1/2" WLEG 1 I 9242' 1-14 1/2" Hanger I liner top packer I I 9392' H7" 26# L-80 (6.276" ID) 0.383 bpf I 8959' 9458' H I--~. III . tIÞ 9800' .. II ~) .'~ .. lit' 110 .0 IPBTD l-l 10,052' 1 141/2" 12.6# (3,958" ID) 0.0152 bpf H 10,134' I ~ . ... I PBTD H 10219' I 7" LNR, 26#, L-80, .0383 bpf, ID= 6,276" -1 10262' ~ DATE REVBY COMMENTS DATE REVBY COMMENTS 12117181 ORIGINAL COMPLETION 01/24/01 CONVERTED TO CANVAS 02/27/01 SIS-LG FINAL 02/27/01 SIS-LG CORRECTIONS 08/27/04 TJS Proposed Rig Sidetrack 09/09/04 TJS Tieback Revision PRUDHOE BA Y UNrr WELL: E-20A ÆRMrr No: XXX-XXXX API No: 50-029-20576-00 SEC6, T11N, R14E BP Exploration (Alaska) LARRY GRANT Attn · ALASKA OIL + GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 September 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: E-02 (34-06-11-14) # DESCRIPTION 1 CN/GR FINAL BL 1 CN/GR FINAL RF SEPIA 1 CCL/PATCH FINAL BL 1 CCL/PATCH RF SEPIA Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 1470.01 5938.02 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage Received by Please sign and. ~u~n ~O.: Petroteehnteal Da~a BP Exploration (Alaska) Ino 900 Eas~ Benson Boulevard Anchorage, Alaska 99908 Received by Date LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 29 September 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~~~-~ DESCRIPTION E-20 (24-05-11-14) 1 CN/GR LDWG TAPE+LIST c-°. {~0-~i-~- 9 ,~ ~/~ ~.~w~ ~..~.s~ %~-25 (42-14-11-13) i CN/GR LDW~ TAPE+LIST ECC No. Run # 1 1470.01 Run # 1 4811.01 Run # 1 6221.01 Run # 1 6262.00 Run # 1 6269.00 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 D. Paul Received BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 05/25/93 T9 84580 BPX/PBU~OGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-04'~'0~~ PFC 05/13/93 #1 B-07~'O~ C-29~~CNLPRODUCTION LOG' 05/11/93 05/12/93 #1%1 C-42~5/'~ STATIC 05/12/93 #1 E-07~O-~PROD-F 05/12/93 #1 ' PRODUCTION LOG 05/12/93 #1 E-20~ PROD-F 05/13/93 #1 F-1i~"'~O~-'~' PROD-F 05/10/93 %1 F-16~[q~ CNL 05/11/93 %1 F-l~[--%~ PFC 05/10/93 ~1 F-429~%%~ PRODUCTION LOG 05/09/93 ~1 F-46~-I~ PDK-100 H-i?~-~0 PROD-F M-21~-3~ TUBING CUTTER P-04~l-3~ PFC R-30~,.-~ P~C S-07A~,9~SPINNER/TEMP X-26~O INJ/TEMP 05/08/93 #1 05/09/93 #1 05/19/93 #1 05/11/93 #1 05/18/93 #1 05/16/93 #1 05/14/93 #1 05/20/93 #1 10500.00-10893.00 ATLAS 5 " 11540.00-11785.00 ATLAS 5 " 11000.00-11811.00 ATLAS 5 " 8750.00- 9852.00 ATLAS 5 " 9050.00- 9400.00 ATLAS 5 " 11000.00-11350.00 ATLAS 5 " 9700.00-10140.00 ATLAS 5 " 9200.00- 9500.00 ATLAS 5 " 8830.00- 9564.00 ATLAS 5 " 10380.00-11165.00 ATLAS 5 " 2158.00-11300.00 ATLAS 5 " 9000.00- 9383.00 ATLAS 5 " 10260.00-10720.00 ATLAS 5 " 8400.00- 8474.00 ATLAS 5 " 9100.00-11110.00 ATLAS 5 " 11400.00-11750.00 ATLAS 5 " 11130.00-11400.00 ATLAS 5 " 0.00-10916.00 ATLAS 2/5" 9100.00- 9680.00 ATLAS 5 " Information Control Well Records TO: THRU: MEMORAi OUM S tate of Alaska ALASKA OIL AN~'GAS CONSERVATION COMMISSION / Lonnle C. Sml~~ DATE: July 11, 1990 - Commissioner /~ FILE NO: JT.BF.711.1 TELEPHONE NO: SUBJECT: RIG/BOPE Inspection BPX PBU E20 Prudhoe Oil Pool FROM: Sot, t,y ~). ~o~'~ Petroleum Sunday July 8~ 1990: I made a walk through inspection of the BOPE on D-0y0n worko~e-~'~Rig-16 on BPX's E20 and found all equipment installed properly and appeared to be in good working order. I also checked the BOPE test report of 7/7/90 and no failures were indicated. 02-001A (Rev. 6/89) .~. 20/11/MEMO1.PM3 Standard Alaska j, Production C~ml~ 900 East Benson Bou~ .~rd P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION November 14, 1988 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well E-20 (24-05-11-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. JAB:JAM Enclosures (4) Yours very truly, Manager Production Engineering cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 E-20 Well File . RECEIVED NOV 1 6 !~88 Alaska Oil A G~s Cons. Commission Anchoraga A unit of the original Standard Od Company Founded in Cleveland Ohio in 1870. STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development Exploratory Sffafigraphic Set, ce Perforate Other X 6. Datum elevation (DF or KB) KBE = 60.54 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 1743' SNL, 883' WEL, SEC. 06, T11N, R14E, UPM At top of productive interval 895'NSL, 1337' EWL, SEC. 05, T11N, R14E, UPM At effective depth 525'NSL, 1466'EWL, SEC. 05, T11N, R14E, UPM At total depth 451' NSL, 1491' EWL, SEC. 05, T11N, R14E, UPM 12. Present well condition summary Total depth: Effective depth: 8. Well number E-20 (24-05-11-14) PBU 9. Permit number/approval number 81-39 / 8-468 10. APl number 50- 029-20576 11. Field/Pool Prudhoe Oil Pool measured 10265 feet true vertical BKB 9079feet measured 10148feet true vertical BKB 8992feet Plugs (measured) Junk (measured) fill at 10148' (07/88) Casing Length Structural -- Conductor 110 Surface 2670 Intermediate 9429 Production -- Liner 1305 Perforation depth: measured Size 20x30 13 3/8 9 5/8 7 Cemented 8 c.y. 2627 c.f. 1422 c.f. 438c. f. 10027'- 10046', 10065'- 10114', 10125'-10135' Measured depth 139 2699 9458 true vertical subsea 8830'-8922' (three intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8890' with 4 1/2" tailpipe to 9052' True vertical depth BKB 139 2699 8464 8057-9079 Sqzd: 9930'-9940', 9954'-9996', 10011'-10027', 10046'-10060' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary see attachment 14. Intervals treated (measured) 9 5/8" Baker SAD packer at 8890'; 5 1/2" SSSV at 2064' LEIVED Treatment description including volumes used and final pressure Representative Daily Averaae Production or Iniection Data - OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure t OV ! 6 1 88 Alasl-~a 0ii & (~s C0n~. Commi~sio~ Anchorage Tubing Pressure Prior to well operation 740 2417 14 0 1345 Subsequent to operation 2260 1726 15 0 219 Daily Report of Well Ope~tions X J Oil X Gas Suspended Service 17. I hereby ,~~~t~e'/~ng~rue and correct to the be, st of my knowledge. Signed ~/~__~'~/'-_-_-_-_-_~.. ~¢-1... ..~ Title Mana~Ter Production En~Tineerin~7 Date//,/., .~/dc~o Form 10-404 Rev 06/15/88 / SUBMIT IN,I~F~ICATE WELL E-20 (24-0~-11-14~ PI]ILl CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as detailed below: 6/27/88 Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi. Performed mud acid perforation wash and sump cleanout. 6/28/88 Performed a cement squeeze on existing perforations. Contaminated cement; WOC. Reversed out after 24 hours and tested squeeze. 7/14/88 Perforated the f411owing intervals using Schlumberger 3 3/8" carrier guns at 6 spf: 10027' - 10046' MD BKB (reperf) 10060' - 10065' MD BKB (reperf) 10065' - 10076' MD BKB (add'l) 10076' - 10100' MD BKB (reperf) 10100' - 10114' MD BKB (add'l) 10125' - 10135' MD BKB (add'l) Returned well to production and tested. jm 11/3/88 RECEIVED NOV 1 6 i888 Al~sk~ Oii& Gas Cons. Comlll|ssio. ll Anchora!]e, Slanda,d Alad~a 900 Fast Sanson 8ouleva,d P.O. 8o= 196612 Anchorage. AID,ko 995 ! 9-66 (907) .~64-S I I I DALLAS ARCO CHEVRON EXXON TEXACO TO: MOBIL REFERENCE: PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED b-'rANDARD ALASKA PRODUCTION Date: 07/20/88 TI: 79113 · o. The following material Is being submll~ed herewith. Please acknowledge receipt by slgnlnga copy of this letter and returning It to thls office: · g-08 R-20 H-23 K-09 Prodiction Log 07/16/88 #1 9900-10130 Sch 5" Completion Record 07/14/88 #1 8800-10114 Sch 5" Completion Record 07/15/88 #1 8995-10130 Sch 5" CET 07/13/88 ~1 9050-9914 Sch 5" Race i ved Date ~10I the o~;g;~ol S~o~do,d O~1 Compo.y F~ed in C~vdo~. ~. ~ 1870. Standard Alaska ( Production Company% 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION June 8, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well E-20 (24-05-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. Yours very truly, JAB:JAM~ Enclosures (9) cc: J. L. Haas (MB12-1) E-20 Well File nager Production Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA[ t" ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon r'l Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perlorate [] Other 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 ¢. Location of well at surface 1743' SNL, 883' WEL, SEC. 06, T11N, R14E, UPM At top of productive interval 895'NSL, 1337'EWL, SEC. 05, T11N, R14E, UPM At effective depth 525'NSL, 1466' EWL, SEC. 05, T11N, R14E, UPM At total depth 451'NSL 1491' EWL, SEC. 05, T11N, R14E, UPM 1. Present well condition summary Total depth: measured 10265 feet true vertical BKB 9079 feet Effective depth: measured 10148 feet true vertical BKB 8992 feet Casing Length Size Structural -- Conductor 110 20x30 S u rface 2670 13 3/8 I nte rmediate 9429 9 5/8 Production Liner Perforation depth: 5. Datum elevation (DF or KB) KBE = 60.54 AMSL feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number E-20 (24-05-11-14) PBU 8. Permit number 81-39 9. APl number 5 0 - 029-20576 10. Pool Prudhoe Oil Pool Plugs (measured) Junk (measured) fill at 10148' (08/87) Cemented Measured depth True Vertical depth BKB 8 c.y. 139 139 2627 c.f. 2699 2699 1422 c.f. 9468 8464 .. 1305 7 438 c.f. 8960-10265 measured 9930'-9940', 9954'-9996', 10011'-10065', 10076'-10100' true vertical subsea 8769'-8895' (four intervals) Tubing (size, grade and measured depth) 5 1/2" L-80 to 8890' with 4 1/2" tailpipe to 9052' Packers and SSSV (type and measured depth) 8057-9079 9 ~/8" B~er SAB pa~er at 8890'; ~ 1/2" SSSV at 2064' 12. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 3. Estimated date for commencing operation June~July 1988 :14. If proposal was verbally approved Name of approver Subsequen~ Work Beported on Vorm No." Dated Date approved 15. I herebYr~ce~tify that the foregoing is true and correct to the best of my knowledge Signed ~.j_~ ,~,..~_~,.~ / . ~~, Title Manaf~erProduction En~lineerin~l Commission Use Only Conditioh~ of approval Notify commission so representative may witness IApproval [] Plug integrity [] BOP Test [] Location clearance I Approved by ORIGINAL SIGNED BY -~pproved Copy by order of No. LONNIE C. SMITH Returnedx.) vO - ~,ommi~sioner the commission Form 10-403 Rev 12-1-85 Submit in triplicate Workover Procedure Well E-20 1. Perform pre-workover surveillance. 2. RU slickline unit and determine current TD. If insufficient sump depth is present, perform a gelled water fill cleanout while flowing the well. 3. Install plug with shear disk in tailpipe nipple. Perform perforation surge to clear possible plugged perforations. 4. Rig up CTU and support equipment. 5. Perform perforation mud acid wash, flow well. 6. Fluid pack the well and cement squeeze all perforations. 7. Contaminate cement. WOC. 8. Clean out contaminated cement. Pressure test squeeze. 9. Perforate: 10,027-10,046' MD (19') reperforate (Zone 2A) 10,060-10,065' MD (05') reperforate (Zone lB) 10,065-10,076' MD (11') add perforations (Zone lB) 10,076-10,100' MD (24') rePerfora~e (Zone lB) 10,100-10,114' MD (14') add perforations (Zone lB) 10,125-10,135' MD (10') add perforations (Zone lB) (S3') Reference BHCS 12-12-81. 10. Return the well to production. Perform CTU nitrogen lift if necessary. ' 11. In the unlikely event that the well fails to return to production, perform a stimulation treatment utilizing a CTU inflatable packer set in the 15' blank interval between 9,996-10,011' MD. Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off' Blind Rams Cutter Rams 2' Chicksan (Kill Line) Slips PiPe Rams Pump-In Sub (Circula te/R e turns) Well Head Swab Valve SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO - CHEVRON 3111 '*C" STREET ANCHORAGE. ALASKA TELEPHONE {go7! 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 EXXON zo: SFO/UNIT/STATE: (-Marathon) GETTY MOBIL - pHILLIPS : STATE - BPAE (Transmittal Only) __ CENTRAL FILES (CC#'s - Transmittal Only),, Date: 12/8/82 Trans.#: 2913 CC#: 55913 REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of, this letter and returning it to this office:-- B-13" Pressure Survey & BHPD Otis 10/12/82 E-10~ " " " " GO 10/28/82 E-18-' ...... " "~ " "'~" CAMCO 10/27-29/82 E-2'0f " " " " GO 10/12/82 G-17~ " " Otis 11/9/82 R-2-" " " CAMCO 10/22/82 R-17j " "' Otis 11/7/82 R-19f " " GO 11/18/82 82) RECEIVED DATE - '.. ,.: EIV D Victoria Aldridge Development Geology Well Records TP 1--5 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO - CHEVRON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCR 6-612 ANCHORAGE. ALASKA 9950:2 EXXON To: SFO/UNIT/STATE: (-Marathon) GETTY Date: 12~2~82 MOBIL Trans.#: 2899 PHILLIPS CC#: 55899. BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmit tal Only) 'REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/ARCO ONLY: Y-2 GO CCL/Perf. S-7 "-~c--h---'-'CB~V~ - -- D-2t - Sch __~~- B-25~~s CBL -28 Sch ' CBL/VD 5!~ 5'-! 5'! 5 5'~ '2) SFO/UN IT / STATE: E¥16f' Dres E-16 w Dres E-20j Go H-12]~ Camco X-2 -- Go X-14~/ Go f . A-9 '~ Go D-10 Go RECEIVEO DATE C/O #1 10i7-82 8650--9300 5" Fluid Density #1 '10-6-82 8600,-9300 5" Cont. Flow Survey #1 10-12-82 9700-:10172 5'! Temp. Survey #1 11-.9,-82 10650-,,11200 5'! Differ. Temp.. #1-4 10--11-,82 9.800,-10300 5" Differ. Temp. #1-6 10-.10,-.82 11400--11800 5'! Differ. T~p. #1 10-19-.82 9300~9930 5" Differ. Temp, #1-4 10-9-82 ~ 10800~,11180 5" ~ ..~~~~n Mesmas Alaska Oil & Gas Cons. ' ' '"' ............... ~l~rage SOHIO ALASKA PEIROLEUM COMP,~NY SFO ARCO - CHEVRON 3111 "C" S~REET ANCHORAGE. ALASKA TELEPHONE {9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 9950:2 EXXON GETTY SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS BPAE (Transm'i tt:al Only) _ CENTRAL FILES (CC#'s - Transmittal Only) Date: 9-24-82 Trans.#: 2670 CC#: 55670 REFERENCE: .. ~,,~0 ~FINAL DATA- ~PRESSURE SURVEY DATA copy of this letter and returning it to this office:-- A-15~ GO Pressure Survey and BHPD 8/27/82 N-15-~ Otis Pressure Survey and BHPD 8/28/82 A-19 ..... Sch. Pressure Survey and BHPD 8/29/82 A-18~ GO Pressure Survey and BHPD · 8/29/82 G-19 ~ Camco Pressure Survey 8/27/82 E-15'~ GO Pressure Survey and BHPD 9/3/82 ~ E-10~'~ GO Pressure Survey 9/14/82 E-1~ GO Pressure Survey 9/14/82 E-20-' GO Pressure Survey 9/7/82 N-14 ~ GO Pressure Survey and' BHPD 8/16/82 R-7 '"~ Otis Pressure Survey and BHPD 8/19/82 N-12 "° GO Pressure Survey and BHPD 8/18/82 X-7~ Otis Pressure Survey and BHPD 8./9/82 M-16~ Camco Pressure Survey and BHPD 9/10-12/82 R-8~ Otis Pressure Survey and BHPD 9/13/82 E~ll~' Otis Pressure Survey 9/1/82 E~ll~ Otis Pressure Survey and BHPD 9/11/,82 82) RECEIVED DATE Al:~k,~ Oit & G~s Cons. Commisoton Ancho.~age Karen Mestas Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 September 27, 1982 Alaska Oil and Gas Conservation Con]nission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: E-20 (24-05-11-14) PBU Enclosed, in duplicate, are the following forms for the above-named well. l® e Form 10-407, Completion Re.port; Form 10-403, Sundry Notice and Reports on Wells; Form 10-404, Monthly Report of Drilling and Workovers. ' Yo y~ Enclosures CC: J. D. Hartz Geology Well File #17 RECEIVED SEP 0 1982 Alaska 0ii & Bas Cons, Gommission ALASKA OIL AND GAS CONSERVATION C i ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG - 1. Status of Well Classification of Service Well OIL~I GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum ~y 81-39 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50_029-20576 4. Location of well at surface 9. Unit or Lease Name 1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM Prudhoe Bay Unit At Top Producing Interval top of Sag River SST. 10. Well Number 944' NSL, 1319' 5WL, Sec. 5, TllN, R14E, OPM E-20 (24-05-11-14) At Total Depth 11. Field and Pool 451' NSL, 1491' EWL, Sec. 5, TllN, R14E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool k~E = 60.54' A~LI ADL 28304 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 11./27/81 12/13/81 12/17/81 feet MS LI one 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10265'~ 9079'TVD 110219'MD 90'45'TVD YEs [~'' NO []I 206'4 feetMD 2030l 22. Type Electric or Other Logs Run DIL/GR/SP, GR/SP/DIL~HCS, GR/FDC/f2~L/Cal, HDT, CBL/CCL/GR/VDL, gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD ,,, SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE sIzE CEMENTING RECORD AMOUNT PULLED 20"x30" Insu~atE~d conduc~:or Surface 110' 36" 8 cu.yds., concrete 13 3/8" 72~ L-80 Surface 2699' 17%" 2627 cu. ft. ArcticsE:t II 9 5/8" 47~ L-80 Surface :9458' 12¼ 1292 cu. ft. Class G 130 .cu. ft. Arctics~;t I 7" 26~ L-80 8960' 10265' 8~" 438 cu. ft. Class F w/i8% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER, SET (MD) Prudhoe Oil Pool Top: 9930' '~7~9; 5~"2 9052' 8890'. Bottom: 10100 ' 8895 ' 9930'L 9-~74~'BKB'-(~9'--8776'~sS) ...... 2(~. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9954'-- 9996'BKB (8787'.8818'TVDss) .' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL.=, USED ' 10011'-10065'BKB (8829'-8870'TVDss) 10076'-10100'BKB (8878'-8895'TVDSS) , , 27. PRODUCTION TEST . Date :First ProdUction, r ' ' '" .Method of Operation (.Flowing, .gas. lift, etc.) 08/31/82 Flowing . Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-M'CF WATER-BBL CHOKESIZE IGAS-OILRATIO' . . TEST PERIOD I~I "' FlowTubing CasingPressure 'CALCULATED OIL-BBL GAS-MCF WATER-BBL . OIL GRAVIT'Y-API (corr) · Press. -. 24.HOUR.:RATE I~': ' . ' , 28. CORE DATA Brief description of lithoiogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · · Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. C,~=TH GOR, and time of each 13hase. BKB Subsea _ Sag River SST. 9460' 8405' ShublJJc 9493' 8431 ' · Ivishak 9544 ' 8472 ' , None ' ,~ Sign _ ~'~ ~~L~ TitleDistriCt Field Date f × ~. d~. ~sga ~1 Ehg~neer INSTRUCTIONS General: ;,Th:is form is d. esigned for submitting a complete and correct well completiOn report and log. on .~'. all types df lands and lea'Ses in Alaska. Item 1' C~aSsification::of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which' elevation is used as reference (where not otherwiseishown) for depth measurements given in other spaces on this form andilin any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and ir~ item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27i Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALASKA~ AND GAS CONSERVATION C~"~'~MISSION SUNDRY NOTICES AND REPORTS N WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. Sohzo Alaska Petroleum Company 81-39 3. Address 8. APl Number Pouch 6-612,Anchorage, Alaska 99502 50- 029-20576 4. Location of Well At Surface: 1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number ~.-20 (24-05-11-14) 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 60.54' AMSL I ADL 28304 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data [] 11. Field and Pool Prudhoe Bay Prudhoe Oil' Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] ~ 'Perforations J~] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The follwoingintervals were perforated August 31, 1982, using Dresser Atlas2 5/8" carrier guns at 8 spf. A lubricator was installed and tested.to. 3200 psi on well work. 9930' - 9940' BKB (iRef. B~CS/GR, 12/21/8~) 9954' - 9996' B~ 10011' - 10065' BKB ( " ) 10076' - 10100' BKB C " ) An SSSV was set and tested in the ball valve nipple at 2064'. RECEIVED SEP 0 ]982 Alaska Oil & aaa Cons, Commission Anehorage · 14., her~erti~tha, t.~g~g ~ true and correct to the best of my knowledge. ' Sign~l"_//~~~ ~ 'Title ~_~cr~*l-_ Field Eno~eer The Ra~ belo~3ommi.ion us~ Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-14~0 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well Workover operation ["] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchoraqe, Alaska 99502 4. Location of Well at surface 1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 60.54.' AMSLI ADL 28304 For the Month of .... September 7. Permit No. 81-39 8. APl Number 50- 029-20576 9. Unit or Lease Name 10. Well No. " E-20 (24-05-11-14) 1 1. Field and Pool Prudhoe Bay Prudhoe Oil Pool ,19 82 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run RECEIVED 6. DST data, perforating data, shoWs of H2S, miscellaneous data See Attached SEP 0 ]982 Alaska 0il & Gas Cons, Commis~ion Anchorage 1 7. I herebv l~tif¥~ing is :rue and correct to me best of my knowledge. I SIGNED/'~~-.~D~~ TIT E District Field Engineer ~ ~. ' ~ ~ DATE Oil and Gas Conserv~on Commission by ~he 15th of ~he succeeding month, unless otherwise directed. Form 10404 Submit in duplicate Rev. 7-1-80 PERFORATING DATA - Well E-20 (.24-05-11-14) August 24, 1982: Pressure tested tubing and inner annulus. August 31, 1982: September 4, 1982: Rigged up Dresser Atlas and perforated the following interVals using 2 5/8" carrier guns at 8 spf: 9930' 9940' BKB (Ref. BHCS/GR, 12/21/81) 9954' 9996' BKB ( " ) 10011' 10065 BKB (. " ) 1007'6' 10100 BKB ( " ) Put wellon'production. Shut well in to prepare for static pressure survey. SePtember.6, 1982.: Ran static pressure/temperature survey at 8800' TVDss. September 9, 1982: Set and tested SSSV in ball valve nipple at 2064'. Well on production RF.C IVED SEP 0 1982 Alaska Oil & 6as Cons, Commission Ancl~orage SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 July 1~, 1982 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V..Chatterton WELLS R-8, Y-10, Y-13, A-15, A-18, A-19, E-10, E-15, E-17, E-18,~2Of E-21, G-18, M-15, M-16, M-17 Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. This contains our. proposal to perf. orate, the wells/~ d Eng±neer GJP: JLH: ybr Enclosures' cc: J.D. Hartz Geology Well File #17 O~1~_ STATE OF ALASKA tl ALASKA ' AND GAS CONSERVATION CO MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 81-39 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of Well At surface: 1743' SNL, 883' WEL, Sec. 6, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE - 60.54' AMSL 12. I6. Lease Designation and Serial No. ADL 28304 8. APl Number 50-- 029-20576 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number E-20 (24-05-11-14) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate ~ Alter Casing [] ', Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated during July/August 1982 using Dresser Atlas 2 5/8" carrier guns at 8 spt. A lubricator will be installed and tested to 3500 psi on all well work. 9930' - 9940' BKB (Ret. BHCS/GR, 12/21/81) 9954' - 9996' BKB (Ret. BHCS/GR, 12/21/81) 10011' - 10065' BKB (Ret. BHCS/GR, 12/21/81) 10076' - 10100' BKB (Ret. BHCS/GR, 12/21/81) An SSSV will be set and tested in the ball valve nipple ca. 2000'. Subsequent' Work Reported on Form No./~Datecl Signed// ~ t'~¢'~ Title District Field Engineer Thes~ac~belowf~mission use ~.J. Pl:].sga Date Conditions of Approval, if any: Approved b¥ ~ LtlI{NJ[ C, SMIIli COMMISSIONER Approved .:opy Returned the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 January 18, 1982 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well E-20 (24-05-11-14) Enclosed, in duplicate, is Form 10-407, Completion Report, for the above-named well together with the Well History, Well Logs, and Directional Surveys. 'This well has been completed as a non-perforated oil well. RHR: ja Enclosures cc: Well File #17 Geology Yours very truly, District Drilling Enginee'~ STATE Of ALASKA ~ ' ALASKA O~i'L ,~,4D GAS CONSERVATION COI~,,,'ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 81-39 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20576 4. Location of well at surface 9. Unit or Lease Name 1743' SNL, 883' WEL, Sec. 6, TllN, R14E, OPM '~[OCAT1ON~I Prudhoe Bay Unit At Top Producing Interval top' of Sag R. SST. VERIFIED i 10. Well Number 944' NSL, 1319' EWL, Sec. 5, TllN, R14E, UPM i Surf. . ~ E-20 (24-05-11-14) At Total Depth ' B.H. ! 11 Field and Pool 451' NSL, 1491' EWL, Sec. 5, TllN, R14E, OPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 60.54' AMSL ADL 28304 12. Date Spudded11/27/81 13. Date T.D. Reached12/13/81 14. Date Comp., Susp. or Aband.12/17/81 '115' water Depth' if °ffsh°re feet MSL 116' N°' °f C°mpleti°nsOne 17. TotaISepth(MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set I 21.Thickness of Permafrost 10265'MD 9079'TVD 10219'MD 9045'TVD YES~ NO[~ 2064 feetMD 2030' 22. Type Electric or Other Logs Run DIL/GR/SP. GR/SP/DIL/BHCSo GR/FDC/CNL/Calo HDTo CBL/CCL/GR/VDL° avroscoDic survev 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20"x30" Insulated Conducto: Surface 110' 36" 8 Cu.¥ds. concrete !.3' 3/8" 72# L-80 Surface 2699' 17 1/2" ~.27; cu.ft. Arctics6t II 9 5/8" 47# L-80 Surfa6e .9458' 12 1/4" 1292 ~cu.ft. Class G; 130 cu. ft. Arcticset I ' 7" 26# L-80 8960' 10265' 8 1/2" 438 cu.ft. Class G ~/18% salt 24. Perforations olpen to Production (MD+TVD Cfr Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5 1/2" 9052' 8890' None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. · · ~ ~ DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED · ) , · , , , , · 27. PRODUCTION TEST ' · Date Fi'rst ProductiOn , · I Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERI,O.D I~ ..'., Flow'T~bing" Casing Pressure ~ CAL~CULATED OIL-BBL GAS~McF WATER-BBL OIL GRAVITY-APl (corr) '" [~24-'HOU R RATE. ~ Press. . 28. CORE DATA -Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ,. , None · · · Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ' *" 30. ..... ' ·: ' _ GEOLOGIC MARKERS FORMATION* TESTS ' . · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. · BKB ' Subsea · Sag River SST. 9460' 8405' Shublik 9493' 8431' Ivishak 9544 ' 8472' 31. L~S:T OF ATTACHMENTS .Well History, Well Logs, Directional Surveys 32. . [ hereby certify that the foregoing is true and correct to the best of my knowledge sH'~ 'llH/"'/;'~'Signed ~ ~d?~ Y/ ~-. District DrilAing Date I '" Title Enqineer RUCTIONS General: This form is designed for Submitting a complete and correct well completion report and log on all types'of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt Water disposal, water supply for injection, observation, injection for in-situ combustion. · Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given .in. other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (mu~Itiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in .item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any rr~Ultiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ~.T. E-20 (24-05-11-14) W~LL HISIORY Spudded well at 1430 hours, November.27, 1981. Drilled 17 1/2" hole to 2699'. Ran 69 jts. 13 3/8" 72~ L-80 Buttress casing to 2699'. Cemented with 2627 cu. ft. Arcticset II cement. Installed and tested BOPE. Cleaned out to 2587'; tested casing to 3000 psi, okay. Drilled out to 2718', ran leak-off test to 0.73 psi/ft, gradient. Directionally drilled 12 1/4" hole to 9458,. Ran open hole logs. Ran 247 jts, 9 5/8" 47~ L-80 Buttress casing to 9458'. Cemented in two stages: First stage with 1292 cu.ft. Class G cement; second stage through D.V. packer at 2603' with 130 cu. ft. Arcticset I cement preceded by Arctic Pack. Cleaned out D.V.; tested casing to 3000 psi, okay.. Cleaned out float equipment and directionally drilled 8 1/2" hole tc~ 10265'. Ran open hole logs. Ran 31 jts. 7" 26~ L-80 IJ45 liner to ].02.65'. Cemented with 438 cu. ft. Class G cement with 18% salt. Cleaned out to 10220', tested casing to 3000 psi, okay. Changed well over to NaC1; ran CBL. Ran 212 jts. 5 1/2" 179 L-80' IJ4S IPC tubing to 9052'. Landed tubing with ball valve at 2064'. Installed and tested tree. Displaced tubing to diesel; set packer at 8890'. Tested tubing to 3500 psi, okay. Released rig at 2400 hours, December 17, 1981. SOHIO ALASKA PETROLEUM CO. ontrolled Drilling PAD. E (24.05 · II · 14) ~, E.20 '~ Consultants LES HENDEI~SON 349-3114 Controlled Drilling Consultants P.O. BOX 1189 PALMER, ALASKA 99645 M~. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502 Dear Mr. Rose RE: Magnetic Single Shot Survey 3ob No. A1281-008 Well E-20 (24-05-11-14) Prudhoe Bay Field North Slope, Alaska. Date of Survey: 11-29-81 to 12-08-81 · Please find enclosed the "Original" and six (6) copies of our Magnetic Single Shot Survey on the above well. Radius of Curvature was the method in calculating this survey. The depth interval of the survey was 2665 to 9356, Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants c_. :.- h:--, Terry V. Henderson Directional Supervisor COMPLETION REPORT 09 DEC, 81 SOHIO ALASKA PETROLEUM . WELL E-20 -HAGNET'IC £:[NGL'E"SHOT SURVEY ' K B ELEV RADILJS OF CURVATURE 'HETHOD OF COMPUTATION _C. OMPUT. E_D..~OR CDC. BY..F~_~_D~EY & ASSOC~ ........... RECORD OF SURVEY TRUE ' · :. ~:' .,:' . · . ~'~_~RI?~_.VF.~.ICAL SUB.-','' DRIFT .. TOIAL_.C.OORDINkTES.. C L 0 5 U_R .E._S ...... SEVERITY .... SECTION~ DEPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE DEG/IOOFT DJSTANCE D H DEG, D N 5 0 0 0 0'-;'00 -60.54' S :O.OOE 0'66 :: :. :: .. . ASSUMED VER_-r_.I_,C__AL_._~.O_. 2665 .:'F'T.;:: ' ?:'::: ;..::' !:': ':~:; '::: ~' ;':'; :';, ............................. ' ' :: .................... :_,. :: .... 0,00 2849 2 30 2848.09 2787.55 &72.00E 47.03 5 34.17 E 58.13 S 35 59 59 E 0.088 2942 6 30 2940.79 2880.25 S56,00E 50.22 S 40.70 E 64.64 S 39 I 37 E 4,307 3037 9 45 3~3~,'§2 2974'28 555'OOE ~-"~'~82 'S : .... 5i,~7 E"' 77,61 3131 11 30 3127,20 3066.66 .' S55,'OOE 67.76 S ' '65,96 E 94,57 S 44 13 47 E' ':" 1,862 · . 3225 13 30 3218,97 3158'43'/S5'~".00E 79,57 $ ,... 82,53 E 114,64 S 46 .2 34_..~I ............ 2,128 33I'~-].'6 .... i'~ ..... ~3'09.81 ~'~-~ $53,0~E ......... ~'93 5 101,92 E 138,60 5 47 20 14 E 2,927 3412 18 45 3398.50 3337,96 S54.00E 110.56 S 3538 21 0 3516.99 3456,45 554,00E 135.74 5 .... ' b4.o'6 35 3.52 '$50.0o .......... tS'?*53 s 7 27 15 3717,10 "3656'56'~ :$53,00E 190.71 5 · 3850 30 I5 3798.62 3738~08 S49'00E 2~8,85 S 124,40 E 166.43 S 48 22 14 E 2.690 159,05- E 209,10 S 49 31 19 E 1',786 186.94 E 244.47 $ 49 52 50 E 2.484 228.66 E. 297,75 S 50 10 14' E 3.239 263.41 E' 342.47 S 50 16 43 E 3.405 57,56 64.39 77,55 94,57 114.58 138.38-- 165.96 208.16 243,21 296 · 07 340,46' -3951-'34"45 3883;78 ...... ~g~':~';27~-'--5~+'8';00E ..... 254.80 S' 4424 36 45 4267.64 4207,I0 549,00E 437,90 S 4897 35 45 4649.08 4588,54 S47,00E 625.04 S --5.~--~/~-45"'5'0~34,53 4973e99 547;~'E ..... 810'82 S' 918,07 E - '1'224.86 S 48 32 98 E 0.212 .. 5807 33 ~5 5396.57 5336.03 545.00E 982.05 5 1095.38 E 1471.~5 5 ~8 7 21 [ 0,268 6311 33 45 5815.63 5755,09 S~3,00E 1183~46 5 1289,88 E ·1750.54 5 47'27 49 E ........ 0e220 -6782-33'~0 ..... ~267.82 61~7,28 543-;~0E ......i37'4;21'5 i467.76 E ~2010'.67 5 46-'53 '6 E 0,053 7060.33 ~5 6439.31 6378.77 S43,OOE ~86,80 S 1572.75 E 216~.28 5 ~6 36 32 E 0.090 7540 31 ~5 68~2.99 6782,45 543,00E 1676,70 5 1749,83 E 2423.~8 5 46 13 21 E 0.417 --79"~-?--29"~'0-7167,38 77'~-~6-'2-~-~--~-~3;0'0E" 18i7.'~5 5 1880.80 E ' '304.04"E 396,70 5"5'0- 2" 8'E ...... 4,467 ....... 394.55-- 511.00 E 672.97 S 49 24 18 E 0,430 670.06 718,84 E 952.58 S 48 59 33 E 0,256 949,08 1221.13 1467.48 1747-48 ..... 2'008 2162,17 2421.77 2615.23 5 45 59 10 E 0,597 2613.78 SINGLE S~-IOT SURVEY ........ o9 'DEc. 81 RECORD OF SURVEY TRUE ...... = ..... ;_= _ .................. '-~i ~'~-S ~--'L~R I FT ' vERT I CA L SUB DRIFT TOTAL COORDINATES DEPTH ANGLE DEPTH SEA DIREC D M DEG. 8413 90 1.5 ?.597.~+? 75~6'9:~..:::S~0'00E:- - - 2002.16 S 204~+,A9 E P,~ '., 31 15 8029,74 7969,20 S36'OOE 2204,-/8 S 2202,79 E .... 9~'I~2'-'35 .... 15 ..... 8335'76 ..... 8'~'"/'5,-~-2 5~'O;'O'O-E 2-372;97 5'2312.'02 E DOG LEG C L 0 S U'R"'E'S ....... SEVERITY DI STANCE ANGLE DEG/iOOFT D M S 2861,57 S 45 35 57 E 0.215 3116.63 S 44 58 26 E 0,292 9313.07 $' z+4'15 1"6 E 1'o222 EXTRAPOLATED TO TD, , BOTTOM HOLE CLOSURE- 3354,48 FEET SECTION DISTANCE 2860,56 3116,24, 3354,.~8 'SO~'i 5- ~',[EEL MEASURED DEPTH AND OTHER DATA SINGLE SHOT SURVEY FOR.EVERY EVEN iO0 FEET OF SUB SEA DEPTH, 09 DEC, 81 TRUE ....... ~;i~UREb ....... VERTICAL SUB ,. :MD-TVD DEPTH DEPTH: 'SEA' ;'DIFFERENCE 161 161, 261 261, 361 361. 461 461, 561 561, ..... 66 i .............. 6'6i 761 761 861 861 9g'l ................ 96-1 1061 1061 .~! ~ _z ................ 11 _6_i __ 1261 1261, 1361 1361, VERTICAL CORRECTION "300: 400 ' 500 ..... 100 0 0 200 0 O ::0 0 600 700 800 . ' · .900 0 1 ooo "o 11oo' .'. o 1200 0 1300 0 0 0 0 0 0 0 ' 0 0 0 0 TOTAL. COORDINATES 0.19 0,51 0,99 1,61 :2,38 3,29 4,34 5,53 6,85 8.30 9.87 11.55 13,34 S 0,00 E $ 0,02 E S 0.07 E S 0.16 E S 0,29 E S 0,48 E S 0.73 E S 1,06 E S 1,47 E S 1,97 E S 2,58 E S '' 3,29"E ......... S 4.12 E 1461 1461 1561 1561 1661 1661 1761 1761 ........... 186-i ........ 1'861 1961 1961 2061 2061. 2161 2161 ~ 2261 2'26 236].' 236 2461 246 2561 256 '1600 0 1700 0 1800 0 1900 0 1400 0 0 15 15oo: o .........: ..... .':0 .......... i?' 0 19 0 21 O' 23 0 25 1, 2200 0 i, ........ 23.00___ .... o .............. 1. 2400 0 1. 2500 0 2000 0 0 28 2100 0 0 30 0 32 .. 0 · 35 0 37 0 40 3372 3478 -- 3585 2661 2761 2861 2962 -- 3063 .......... .3165 3268 2661., 2600 0 2761, 2?00 0 2861, 2800' 0 2961- 2900 1 3061, 3000 2 3161, 3100 4 3261, 3200 7 3361, 3300 11 3461. 3400 17 3561, 3500 24 0 0 0 1 1 2 3 4 6 7 42 44 47 51 60 71 85 103 123 146 .23 .21 ,28 .43 ,64 .91 .22 ,58 .97 ,37 .79 .20 .60 .97 .22 .54 ,41 .79 ,78 .17 .36 .13 S 5,08 E S 6,17 E S 7.39 E S 8.76 E S '-' 10.28 E ................ S 11.96 E S 13,79 E S 15,79 E ' S 17.95 E S_ . 20,29..E .................. S S S S S S S S 22,79 E 25,47 E 28,33 E 31,36 E ' . . 34,71 E 42.66 E 55,46 E 71.68 E 90.99 E '114.32 E 142,01 E. 172,85 E -~,OilIo' ~.~/E'EL E--2'O'' .......................... sinGLE SHOT ,%URVEY · _ 09 DEC. 81 MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. TRUE FqE-A§U'RED ........ VERT I CAL ,SUB · MD-TVD .... DEPTH DEPTH SEA DIFFERENCE VERT I CAL CORRECTION 3694 3806 ' 923 ...... 4045 4291 4415 4540 4664 4788 5157 5279 5qOl 5522 3661, 3600 33 3761, 3700. 45 386i. 3800. ,::6~'' ........... 3961, 3900· '. '84 4061. 4000. 106 4161. 4100 130 4261, 4200 154 4361, 4300 179 ~.461' ' 4400 : 203 '" 4561,' 14500:'::'..!'227 4661, 4600' '250 : 4761. 4700 273 4861, 4800 296 4961. 4900 318 5061, 5000' 340 · 5161, 5100 :' 361 9 12 17 22 22 24 24 25 24 24 23 23 23 22 22 21 564 5764 5361. 5300 403 5884 5461. 5400 423 6004 5561 · 5500 443 6'i2 ............... 5600 6245 5761, 5700 ' 484 6365 5861, 5800 504 6485 5961, 6605 6061. 5900 6000 ...... 6100 6200 6300~ 6400'~< 524 544 ......... 5.64 584: 604 : 624' :'- 644 663 682 7OO 717 21 20 20 20 2I 20 20 20 20 20 20 20 2O 19 19 18 17 16 6725 ....... 6.161, 6845 6261, 6965 6361, 7085 6461, 7205 6561. 6500 -7324 6661, 6600 7443 6761. 6700 7561 6861. 6800 '7678 6961. 6900 7794 7061- 7000 TOTAL COORDINATES 173,64 S 204.91 .':5 244,33 S 290,76 337.89 .% 385.82 S 434,37 S 483,43 S .. 532,48 S 581,56 S 630,62 S 679,47 S 727.81 S 775.69 S 823,13 870.44 S 917.74 965,02 S 1012,35 1059.97 S 1107.94 1156,59 1205,39 S 1254,08 S 1302.68 S 13.51,19 $ 1399,66 $ 1448.24 S 1496,94 S 1545,37 S 1592,68 S 1639,09 $ 1684,62 1729.05 S 1772.28 S 206,66 E 246,80 E 292.35 E 344,12 E 397,07 E 451.41 E 506.95 E 562,93 E 6~7,89 E 671,86 E 724.82 E 777.21 E 829,05 E 880.39 E 931.23 E 981,22 E 1030,24 E 1078,30 E 1125.52 E 1172,24 E 1218,53 E 1264.71 E 1310.33 E 1355,73 E 1401,05 E 144_6..29__.E 1491,49E 1536.79 E 1582.21 E 1627.36 E 1671.48 E 1714.76 E 1757,22 E 1798.65 E 1838.96 E . . . .SOHIO WELL E-'20 HEASURED DEPTH AND SINGLE SHOT SURVEY OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA TRUE M, EASURED .... V'ERTI-(~,L SUB DEPTH DEPTH 7909 73.61, 802~ 7261, 8139 7361, 8255 7461 8486 7661 8602 7761 87].9 7861 8835 7961 ,8952 8061 9070 8161 9190 8261 9312 8361 SEA DIFFERENCE MD.TVD-~ VER~ ICAL' CORRECTION 7100 748 7200 763 "7300 '~778 . ,:: :7400 79A- : . · '~::~750'0' ,.::~:'"'809 "'" ' · 7600 825 · 7700 841 · 7800 858 · 7900 ' 874 · ~-::8000 891 ,"'!:: ':8,1100:' 909 , 8200 929 · 8300 951 15 15 15 16 15 16 16 17 16 17 18 · 2O 22 TOTAL DEPTH· . 09 DEC · 81 COORDINATES 1814,26 S 1878,11 E 1855,96 S 1916,61 E 1898,39 S 1954,79 E 1941,85 $ 1992,99 E 1985,62 $ 2030~53 E 2030,52 S 2068,0l~ E 2076,31 5 2105,06 E 2123.41S 2141.92 E 2171·02 S 2177,94 E 2220,03 $ 2213,75 E 2272.22 S ~_.22~9.~.52 E ..... 2328,`22 S 22'85,24 E 2387,96 S 2320,67 E .z SOHI6 WELL £'-20 SINGLE SHOT SURVEY '[r,~TERP'OLATED VALUES'FOR--EVEN zooo--"~E~.'T OF ~4EA'£URED DEPTH. TRUE ...... Z~I~ A,~O'R F~ D V ER'f'! CAL SUB ...... I)EPTH DEPTH SEA TOTAL COORDINATES 1000 999, 939, 7.41 S 1,66 E 2000 1999. 1939, 26,80 S 12.65 E 3000 2998, 2937, 54,48 S 46,95 E 4000 3923. 3863. 273.52 S 324,87 E 5000 4732. 4672"' 655,97 S 762.74 E ............ 6090 .............. ~57. 5496. 1058.38 s lZ70.69 E 7000 6389, 6328, 1462.44 S 1550.03 E 8000 7239, 7179. 1847.22 S 1908.60 E 9000 8101. 8040, 2240.81 S 2228.31E . . 09 DEC. 81 . ...... ~ : --' - - ...... t' ' - J . · I ' - ' 'IORIZONTAL VIEW i -~ ....... ; ' J ..... OHIO ALASK/~ PETROLEUIV ! WELL E-20 (~t-O5-11-14, ~A D_ IUS_OE_ CU~ R_V_A_T.U RE MAGNETIC SINGLE-SHOT ,SCALE' I"-' jOOO' .-' ' DEC. 1,0~ 1981 ' : :_ · . · · . 1. * [-t J ' ' · ._i.~i _-~- i"' ~, ..... . . -: - .- ._ j.._:.:_:_. -___:..:-_:.?.': ....:: ...... I ; · . · J '' . . I ..................................... j :. i ......... t !- ? . - ! ......... J ~ .... --1 ___1._ = · ,ow,i 'ARE TVD ............. December 22, 1981 Mr. Gary Plisga Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Re: Our Boss Gyroscopic Survey Job No. Boss-16947 Well No. E-20 (SEC6 TllN R14E) Prudhoe Bay Field North Slope, Alaska Date of Survey: December 21, 1981 Operator: Thomas McGuire Dear Mr. Plisga: Please find enclosed the "Original" and sixteen (16) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Yours very truly, NL SPERRY-SUN, INC. Ken Broussard District Manager KB/pr Enclosures .CON !DF_NT A L STAT ,.qlf' ,ALASKA , - ' i_SOH.!O..ALASKA PETROLEUM COMPANY ~ E-20 (SEC 6 T11N RlqE) PPUDHOE BAY ?..ALASKA .................... I. RUE ............ SUB.SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH ..................................... $'PERRY-SUN' WELL SURVEYING CoMpANy :]. PAGE INCL DE ANCHORAGE~ AL'ASK A C 0 M'pU TA T I ON'-~'A-T ~ DECEMBER 22, 1981 BOSS GYROSCOPIC SURVEY JOB NUMBER BOSS-16947 .KELJ. J__B_U.S_H I N G F L F V. = R O- _5 A C 0 U R S E .... :L Co u Rs. E_.,___ _ DO G .- L.E..G _J_O IAL : . ' ' INATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL G MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 100 100.00 59,46 0 2 00 ................ 199 '9 9 .............. 13 9.4 5 ............ 0 300 299.99 239.45 0 0 399.98 339.44 0 0 ......... 4.99....96___: ....... ~+3.9 ,.42 ............ 1 40 70 90 0 599,94 5;59,40 0 0 699.93 639.39 0 0 ............ 79.9.,92 ........... 739.38 ................ 0 0 899.91 839.37 0 1000 999,91 939.37 0 .... 1.1.00 ........ 109.9_.~ 0.., ....... 1039,.36 ............ 0 1200 1199.90 1139 36 0 1300 1299,89 12.39,35 0 1~_00 .... 1399,89 ......... 1339,35 .... 0 1500 1~99,88 1~39.36 0 1600 1599,87 1559.33 0 1~0.0 ....,_. 1_6 99..86 ......... 1639.32 1800 1799.86 1739.32 19~00 1'899.85 1839.31 2000 1999.85 1939.31 2100 2099.84 2039.30 2200 2199.85 2139.29 o 0 0 0 0 0 .... 2.3_0Q ............... 2299..83 .......... 22.39.,29 ........... 0 2~00 2399.82 2339,28 0 32 ....... _$_-66.' 5 9._E _,.-"22~,~SSS:~.. '.~:. ::.L_ ._2.~._._,S 1 .,_5_0 ;i '- 37 S 39.80 E .28 .84 S 2.28 E 57 S 19. 0 E .42 2.05 S 2.90 E 8 ........... S ._13_.~. 9_ .E .... ~, .... __.22 ............. ., ...5_..8..0_S .... 3..~rl E . · . 3.72 55 S 6.19 E ~' 5.58 S 37 S 45.89 E .4! 9.52 S 4.87 E 36 S 62.89 E .18 10,14 S 5.72 E 40 .... S_60 .. O_E .... . ..... ,~_9 1.0_,.6.7_S ~ -7 o._ E 37 s ' 72.3 o E ~ '~ ;:~15~..i:!~i~-:~i;~ili.~.~!i//~ !11.1 A s 7.7'4. E i 31 .... Nii~,86,.Bg..E~ : .' ._9_,.5, 6 E ......... 42 N 79. 9 E .20 11.26 S 10.61 E 48 N 90. 0 E .18 11,14 S 11,92 E 44 ......... N_75.., A_O_E ...... . ..... .2J___ .... L0_..9_8_S_ ] :3.25 E · 27 N 76'5 ' 10. 0 S 1 --' : :. .'. ' ' .2. : 24 .......... ~L .G 6' 40..:E ?': -; ...~=~-~..0.91. __LO_._O_7_S.: 'I ~_OJ~ ii._ EL!? .... :: 1 Z~l N 81.40 E .31 9.85 S 17.00 E 18.16 /~9 N 75,80 E ,16 9,56 S 18,30 E 18,74 ,35 ......... $_?.5_, 19 E_ .,.~~3 9_,3_~__S__ 19,5_1 :E 19_,.;57__ · . % 0,00'-"~ L,.LO__ 2,06 3,39 5 -_ .Q9 6,69 8,06 10.52 11,52 12,_55 _- 13,55 14.30 .14...87__ ........... 15.39 16,10 ~ &. 7_P., 7.20 ,, 7.53 ' 7_._78 '2500 2499,82 2439.28 0 30 ': S 12. 0 E' ........ 260.0 ........ 2599,81 ............ 2539 · 27 ....... 0 .~ 23. ........... . S .... '_7..,.. O_f ........... ,:1.6'' ~' ~>':' .iL'-5.8_. $:~ S.: ':': ::'? .:20.. 37 2700 ,'¥;~699,81 2639,27 0 28 S 35.10 E .23 12-22 S 20-65 E 22.27 2800 2799.79 2739.25 1 31 S 62,30 E 1.12 13,17 S 22,06 E 23,89 2_9_00_ ....... 28.9~_,_6! .......2.839.0] .............5 ..... 9 S .62_,.3.9__E ..........3~,.63 ......... 15_,_87 $ .27.,2~ .... -' 29,17 ....... 3000 2998,78 2938,2~ 9 22 S 55,59 E ~,30 ii. i::' . '.22,55 .S : ~0 99 . . .-. / - ... . ,. : .; .-, SOHIO ALASKA PETROLEUM COMPANY E-20 (SEC 6 T11N R14E) COMPUTATIO~-'D'ATE PRUDHOE BAY DECEMBER 229 1981 ALASKA ' MEASURED DEPTH ANCHORAGE, ALASKA ,: ,- DATE OF SURVEY DECEMBER BOSS GYROSCOPIC SURVEY ,JOB NUMBER BOSS-16947 KELLY BUSHING ELEV. : 60,54 ~ ',:.:~..' ..>'~,~.'. ~ OP~'R-~';r-O'R-THOMAS<.:,J MCGUIRE TRUE SUB-SEA COURSE COURSE DOG'LE'Gi- I ' TOTAL VER'TIC'A'L ........ vE'R'TICAL' ....... INCLINATION .... ~I'RECT-I'Or~' ....SEVEriTY · RECTA'N'G-O[-A'P, COORDINATES DEPTH DEPTH DEG MIN DEGREES 'DEG/iO0 NORTH/SOUTH EAST/WEST PAGE 2 21, 1981_ FT, v E R TfC'A' L-- SECTION 316"0 ........ 3'0'9'7~'-09- ....... 3b'56'5·5 ................ 11' ' ,]'7 .....S--56·."1-9 E · 2·'2~57'<<?·<!:·· <~ :32,75 3200 3194.75 3134'21 13 10 S 53.39 E.: 3400 ~386.78 3326.24 19 3500 5480.77 3420.2~ 20 ..... 3.600 ....... 357.3,.52 .......... 35.!2~,.9.8 ......... 23 3700 3664.34 $603.80. 26 ~800 ~752.62 3692.08 29 ........... 3~00 ...... 38~.7..67] ......... 3777.!,3 ..... 53 ~000 ~919.~5 5858,81 36 4100 3999,3~ 3938,79 4200 4079,30 4018,76 36 4~00 4159.45 4098,89 ~6 4400 ~239,60 4179.06 36 ~600 ~700 4800 ~900 50.00 L._5100 5200 5300 5400 5500 5133.58 5073.04 34 5600 5216,01 5155,~7 ......... 5700 ....... 5298.73 .5238.19 5800 ..:5381.&9 5321.15 53 5900 5~64,77 5~04.23 33 .... 6_0_0.0 ......... 5547.72 ........... 5487.18 ........ 6i00 5630.5~ 5570.00 34 S S S ~400.52 4359,98 36 ~481,28 ~20,7~ 36 4'562.30 450!,.~ ........ 35 4643.43 4582.89 35 4724.55 4664.01 35 4805.82' 4745.28 35 4887.39 4826.85 35 4969,38 4908.84 34 5051.47 4990.93 34 12 S 51.60 E 3.10 79.20 42 s 51.89 E i.si 100.32 10 $ ~9, 0 E 2.70 12'+.15 i 5 ........ S-'4e-:~'9 ~E~' ~ ~L'O~9:::.:i::::i??i;-.::~!~i51.75 ~0 ...... S ...~ 6.'3 0 .:': E:~' ':: 45 S 46.~9 E 3.08 259.35 1 S e6.lO E .28 300.9~ 45 S ~.~0 E .27 3~2.57 52,99 E ' 7 0.51.:. E:... 90,60 E/<.. 78.78 103,16 114.q$ E 141.23 ='_ 170.01 E 132.55 165.63 202,06 274 · 3' 7:': E<> "" 243 289 341 ,09 ,29 .20 315.96 5 359.25 E 402.51E 398.21 457,58 516,95 22 S 45.10 E' 15 s ~'5'Tg'~ E 1 S 45,69 E S ~5.19 E · 72.: 467.08 S . ~ 8 5'o-8-'%-?-'s -- · 24 549, 86 S · 40 590,98 S ~+45.62. E .:' 488.7 531.29 :E... 573,47 615,67 657,45 576,11 635.22 694,16 752.83 811.22 869,28 31 S 43.60 E i ; .53::" ' 716,15 9 ...... s ~s',i'9 E .44 75-8". 17 ~e s 42.so E .68 8oo.21 57 s ~i.8o E .39 8~2,62 38 ....... . <~ .56 885,27 19 S 41, '0 ~ · . . . . 3 S 39,69 [.' ,78., 970.65 ~9 S 39.30 [ .33 1013.73 S S S :'S' ' 780,05':''':' i' ? 1043.24 S 819,7-7' ~E ....... 1'i' O-O' S 858,63 E 1157,79 896,89 E 1214,73 · 9.34.81 >'E;: ;'.:'.i:/~:. ~ ' 1-2 ? 1 · 66 972.~4:?/'E~:<~ .~'~; ~328. z 5 ~008,52.~: ~'. : 138~,27 S 1044,04 E 1440,07 49 S 39.10 E .11 1056,87 q S 39.39 E .29 1100.12 S 1079,22 E 1495,72 S 1114,55 E 1551,5~ 5 S. 39'30 E ~ ,06~'. .i~.: .1143,45 : S 1150,09 E 1607,56 'SOHIO_ALASKA.PETROLEUM COMPANY E-20 (SEC 6 TllN R14E) PRUDHOE BAY ,_ALASKA ..... TRUE ........ SUB~SEA~ MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 6200 5713,45 5652,91 33 6300 5796,67 5736.13 33 6.40.0 5880,18 .......... 581.9.,6a 6500 5964.08 5903,54 32 6600 6048.00 5987,46 33 670.0 ........... 613._1~,50 ......... 60Z0.96 .......... 6800 6214.95 6154.41 33 6900 6298.22 6237.68' 33 ........ 7.00.0 ......... 6381,10 ........ 6320.56 .... 7100 6464.08 6403.54 33 7200 6547.21 6486,67 33 ........ 7300 ............. 6630.,.77 ......... 6570.23 32 7400 6715.15 6654'61 32 7500.. 6800,08 6739.54 31 ........ 76.00 .......... 6885.42 ............ 6824.88 7700 6971.19 6910.65 30 7800 7057.45 6996.91 30 790.0 ............ 7.1~2.6 ............... 7083_.72 ..... 29 8000 7231.42 7170.88 29 8t00 7318.24 7257.70 30 8200 ........ 7404.2.8 ....... ?343.74 ....... 31 8300 7490.11 7429.57 30 8400 7576.10 7515.56 8500 7662,74~0 ................ 7601,86 ........ 30 8600 7749.01 7688.47 29 SPERRY-SUN WELL SURVEYING COMPANY PA2E $' ANCHORAGE, ALASKA ...................... _: ...... , ...... DA T_E__O F__S U.a.V. E_Y__QE,C_~!,BE.B__2X~ :=! 9_81 COMPUTATION DATE BOSS GYROSCOPIC SURVEY DECEMBER 22, 1981 JOB NUMBER EOSS-169~7 :. ' ' ' OPERATOR-THOMAS d HCGUIRE C 0 U R S E CO U KS E.:],_,-- ...... D 0 G = LEG<L" :: _T_UA L .... - IN.CLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 52 S 39.30 E .22 .~.<~.":'I1'86.:71 S .' 1185'50 ~ 1663,43~ 28 S 38.69 E .53 ~- 1229,80 S 1220,59 E 1718,86 39 S 38.89 E .67 1314.78 S 1289,33 E 1828.25 15 S 38.89 E .60 1357.11 S 1323.~8 E 1882.63 21 .: S:39,30 E. '<~.' :1392' 86 1992.71 52 S 39.80 E . 59~ ~ L::,:::1485. 32 "S ~ ~ 14'28.11 :E 20~8.0~ ... 1 0 ... .... :L.~S~: 39~..8_9--E~ .......... ...,3-0~ Z8~~., ' ~ ~ 3 '9. 7, F ....... P ! ~95 ..... ~0 S 39.64 E .52 1571.18 S 1499.66 E 2159.72 50 S 39.69 E .17 1613.97 S 1535.12 E 2215.26 37 S 39.39 E . 1637.~5'~E.~'::.:,:;~ ' 2376.56 . ...{ .. · , ~0 S 39.30 E .5~ la18.79 S 1703.13 E 2~80.01 6 S 39. 0 a .58 [85B.02 S ~735.07 E 2530.6t:~ 16 ...... .':~'S:?:38:':30; E : · 33:<~;~<-~/-.::',.;:~;~93~:..93 :S ;~..::~ 1796-:' 8677E?~>;;;::': 2629.2~ ~ ....... S_ 3,8- 39_ ~,. · 7.9_--!-e~J~3,,~_S : _1,8_5_%,~~3_29_.. 8,L 44 S 37.69 E .46 2054,~0 S ~890.79 E 2781.13. 57 S ~6.59 E .67 2095.02 S ~92~.54 ~ 28~2.~5 55 S 35.10 E >' : 1980 37.E.'::>::~:.>::::' 2932.61 ~. ~ ,:... ,.:, :,, ,..,: 8700 7855.25 7774 88.00 ........ 7920..59 ..... 7860 8900 .':'8006,~7 79~5 9000 8091.32 8030 ...... 9!,0,0 .......... 9200 8257.64 8197.10 · 71 30 53 S 33.19 E ::' ~;"i:,< 11.37:..:.: :iii2218'40 .S'. :' 12008.77i<E<:!:,:'!?~!;:i:::2983.13 .35 ......16 ....... .$ ..... 32,1.o ii .... ao_36- i:!: ......... · 75 31 28 S 30,~9 E ,91 2306,37 S 2063,62 f 3086,31 · 78 31 58 S 28.50 E 1.12 2352.17 S 2089.~7 E 3138,36 33 4 8. .......$ .2_7_~9__E .... ~ . k,~ ..... ~_O_O~A_S 2_!!~ .91. E ..... 3 ~ 91~ 9_0 _ 35 16 S 26'50 E < : S ~SO.H!O_ALASKA PET.ROLEUM COMPAN.Y.~ ........................................ ~ E-20 (SEC 6 TllN RIOE) COMPUTATION DATE ' PRUDHOE BAY DECEMBER 22, 1981 _ A.. L_A._S..K.A ........................................................................................... ~PE'RRY'sUN .... WE~I~4~':'"'s-UR'V-E~'~;TN'-G CONPA.NY ': PAGE ANCHORAGE, ALASKA:' ~ ~ ~'~.-'~':..;.<. ~?;DATE OF SURVEY DECEMBER 21~ 1~81 ....................... TRUE ......... SUB-SEA ..... COURSE ' COURSE DOG_LEG?i!.. i:i <i!~ ., TOTAL MEASURED VERTICAL VERTICAL INCLINATION ...... ~I"RE~Ti'6N .... ~E'V~¥'Ty RECTANGULAR COORDINATES · DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST BOSS GYROSCOPIC SURVEY JOB NUMBER BOSS-16947 KELLY BUSHING ELEVo = 60,54 FT, <'< OPERATOR=THOMAS d.iMC6U!RE VERTICAL SECTION 9400 ......... 95.00 9600 S 19,89 E 9700 ...... 9.8 0.0 9900 10000 1_0.1~0.0 .......... 8956,24 ........... 8895,70 ...... . ~ ..41~ .~58 ...... ~.S_.~,..1.9 E 10265 9078,90 9018,36 41 58 S 19,19 E 8576,58 8516,04 37 57 8654,81 8594,27 39 ~ 873_1,66 ............. 867.1.,12 ............. 40 ..... 28 8807,15 87q6,59 ~ 32 8881,81 8821.27 A1 49 2165,51 i:iE · . 2210 · 9.9 :~' :~-i: il~'' '~: 2673,81 S 2232,16 E 3363,24 3421,80 3480'230 S 18.50 E S 1.7.,_60_ E S 9.19 , E ' S '19,60 E 1,42 2732,62 S 1,50 279'3, ~+5 S -. ~',3..!"~'; >< 2981 · ~ 1 S __ .00 ~085,~5 S 2252,63 2272,~4 2s 2373,72 E 3539.40 3599.69 3661,66 3724,84 3788,29 3893,03 HOR_I.Z.ONT..~AL__O.ISP_LACE.MEN~._: .... 3893,03 _FEE. T_..A!.__.$OUTH~ 37 DEG, 3~ MIN, EAST THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE~DIMENSIONAL?!RADIUS AT MD = 10265 OF CuRVATUR:Ei! METHOD. · :' SOHIO kLASKA PETROLEUM. COMPANY E-20 (SEC 6 TllN RI~E) PRUDHOE BAY .............. ~ ................. . i i . . SPEPRY-SUN ~ELL SURVEYING coMPANY;: ' ~:" ' ~'" :' PAGE 5' ANCHORAGE,~ ALASKA . - ': :_.D_~_~._O.F__$_U_EV_EY_ D~.,_C_EMBER_21, _ 1~8~ COMPUTATION DATE DECEMBER 22~ 1981 INTERPOLATED_VALUES F 0 R E V E N .~ 1 0..0 0 ._E_E.E]'__O F-_.M_~:$_U~_ED._.D_~_T_H .......... JOB NUMBER 80SS-169~7 K£_LL_Y__B_U.8_H_I_N_~.._[~L"' V., = 6QL_. 5 4 F T ~ .OPERATOR-THOMAS d MCGUIRE ' TRUE SUB-SEA ~_MEASUR. ED ..... VERT. I. CAL ....... V, ERTIC, A.L ...... RECTA !DEPTH DEPTH DEPTH NORTH { ............... o ....... o.oo ........ . -eo. 4 iO00 999.91 939.S7 1 ooo iggg. lg g. i i .... ~0,00 .......... 2998,78 ........... 2938..2~ .............. 2 ~000 ~9~9,~5 ~858,8~ 25 5000 472~,55 ~664,01 67 ......... 600.0 ....... 554.?...?e ............ 5q87.18 ............ 110 TOTAL ~ G UL A R.. _COO RDZNA~JE.S__ .... d~L -[I=_T_~D ..... V. EET_I.C_AL /SOUTH EAST/WEST :i-DIFFERENCE. :. CORRECTION O,lq S 5.72 0.07 S 16.08 2.55. S ...... 9.35 S 315-96: 7000 638i.i0 6320.56 1528.27 S i463.97 E 8000 723i.42 7i70.~8 i93~.93 S 1796.86 E ........... ~000 .... 809.1..3~ ............803.0.78 .............. 2352.17..~S .......... ~O.~.~.~.7_E 10000 8881o81 8821.27 2918.~2 S ~ ~2315-25: E 10265,.- 9078.90 9018.36 ~085.6~ S..257~.72 'E THE CALCULATION ~PRocEDuRES ARE"BASED ON 618.90 768.58 908.68 166.62 1~9.68 - - '-i~u.,~u :~. 209 · 51 1186.10""? ' ':T"HE)~dS:E-'o:F'"-~-R-~*f'E-'~'Z-~ENS IONAL RADIUS OF CURVATURE METHOD, Z SpERRY-SUN ~ELL- SURVEYING COMPANy · PAGE 6 ~ ANCHORAGE, ALASKA' "~: ~"'~ ' · · !_SOHIO .ALASKA PETROLEUM . COMp. AN.Y .... "DATE OF SURVEY DECF-MBER 21, 1981- ) E-20 (SEC 6 T11N R14E) 'CO~1'PUT'A'TI'oDT-DX~rE PRUDHOE BAY DECEMBER 22, 1981 JOB NUMBER BOSS-16947 FA-L.-A-SK---A- KELLY BUSHING ELEV, = 60,54 FT, ! . · ,..:.:.: : .i: "OPERATOR-THOMAS J MCGUIRE TRUE SUB-SEA TOTAL ~_,M,E.A,SU~ ED. ......... ..V.E R T,!~,AL ............. ,v. ER T I,C,A~ ...... RECTANGULAR COORDINATES MD-TVD VERTICAL .... I DEPTH ·DEPTH DEPTH N 0 R T H / S'O U~TH ~-~ '~iiETA~ T/W ES.T 60 60.5~ 0,00 ,00 S ,11 E ,00 ,00 160 160.5/~ 100.00 .09 S 1.15 260 _260.54 200'00 .51 S 2.00 360 360.54 300.00: 1.43 S' --'i~:' 112'69: 46o A6o.54 4oo'oo. 3.o s~I'~ .:~3~22 :3.65: E 3.8~ E 4.18 E 4,56 E 5.35: E G.'!30 E i i .......... 560 ............. 560...5~ ............. 500...0 0 ........... 4.9~..S ' 660 660.54 600.00 6.5~ S 760 760.54 700.00 7.98 S , 8..6.0_ ......... 860_,.57 ................. 800.00 9.23 S i 960 960.54 900.00 9.95. S ' ~ 1060 1060,54~ .1000,00 10 44 S' ! ........... 116.0...'__.L1.1.60.~.54 1100,00 11.01 S : :: 7-33. E 1260 1260.54 1200.00 11.32 S "8.35 E 1360 1360.5~ 1.300.00 11.~2 S 9.21 E 1460 1460.5~ 1400.00 11 35 S 10 14 E ..... ........... '5 -,'S 4--' '" 5'o"o. o o s i , i~60 i660.54 i600.0o ii.ii :s L ...... ~ .... !..7_.6.0_ ....... 1.76.0._. 5.~. .......... 1Z.o..o..o.o. ............ i 0 ' 7_7. .06 .08 .08 · · 10 :> .11 .11 .12 .01 .00 .00 SPERRY-SUN WELL ANCHORAGEe ALASKA· I~.SOHI,O,~AL,.AS.KA PETROLEUM COMPANY E-20 (SEC 6 TllN Ri~E) COMPUTATION DATE PRUDHOE BAY DECEMBER 22~, 1981 ALAS K A ................................................. ' ' PAGE 7 : · . JOB NUMBER B06S-169~7 · . K~LJ._Y__B_U. SJ-L~G_, ELEV. = .Rq..B4 FT. ~ . ~' :~ :/::~:,': :OP ER A T 0 R -T H 0 M A S d',:. MCG U IR E I N.T E R P 0 L A T ED, .V A L UES ,], E 0 R, EVE N ,100 .... E,EE I~.._O.F~..S~U~B..~.~~E~ .. :~.':.:;~;; ~;~ ~/'` TRUE SUB-SEA TOTAL F-MEA,S URED .......... VERTICAL .......... VE.R TI CA L_,_,REC T,A NG U L A R ...... ,CO 0 R,DiN KT_ES ...... M D_-_T_VJ3__ ......... V E~_T_I,C, AL S 0 U T H E A S T / W ES T D I F. FER:EN CE!.::~:..::iiii:~ ::::. CO R R E C T I 0 N i::';"i'i! i; :i' ./:' ~ i DEPTH DEPTH DEPTH ' NORTH/ 1960 1960.5~ 1900.00 10.18 S 15.82 E .15 .00 2060 2060,5~ 2000,00 9.90 S ~6.53 E .15 . .00 216.0 ........ 2.16~0,,5~ ................ 21,00.,00 .................9,70_.S ...... 17_,_7~__~ ...... :. ,~.6 ......... ,.01 . . . 2260 2260.5~ 2200.00 9.~0 S ~ :~:': I9'1:ZE ::~ ':' '~' 2560 2560.5~ 2500,00 ' 9,57 S :: :~ :: ~ 20,0~E ;,~ ;:'";~ ?; .01;' 2560 2560.5~ 2500.00 11.3~ S ~0.3~ E .19 .00 2660 2660,5~ 2600.00 11.96 S 20,46 E .19 .00 _2]60 .......... 2760.~5~ ........:..2700.0 0__ .... 12,69 S .......... 2.1..,1_3,~ ........ ,~ ...... .03 2860 2860,5~ 2800,00 [~.~7 S : 2~'53 E ~;.':?' ,08 '.-:: :.~::..:: .. . . 2961~ . 2960-5~ 2900,00 ~0.62 ........... 306.0..5,~ .............. 3000..00 316~ 5160.5~ 3100.00 5267 ~260,5~ ~200,00 ...... 5..512 .......... 336.0.,5~ ............ 3,500-00 5678 5~60.5~ ~00.00 5585 3560.52 5500.00 ........ 66 .......... 560.0 ,oo · . / 2.18 3.00 .&.,_4_~+ 6. o 8 SPERRY-SUN W~LL SURVEYING' COMPANY ANCHORAGE, ~ALASKAi ' ..... ' ~:'. : .'-:: ~ iiDATE OF i_S,OH~IO, ALASK. A PETROLEUM COMPANY ........ : .............. ~ E-20 (SEC 6.TllN R14E) COMPUTATION DATE PRUDHOE BAY DECEMBER 22~ 1981 ALASKA ................................................ I.NT,ERPOLA.~ED.,.,¥.~LUES. FOR ,E~,EN 100 FEET' OF SURVEY DECEMBER 21, 1981 - dOB NUMBER BOSS-16947 KELLY BUSHING ELEV. = 60.54 FT. . ~:. : : OPERAT.OR'.THOMAS-'!:UiiMCGUIRE .., '.: i~ '/::i' ii.:i:,'.: /": .: ,, SUB'SEA DEPTH . ·. :' ' ".'" : TRUE SUB-SEA TOTAL F.MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES ~-EP T H .............. DEpT-H ............ DE'pT'Hi! ........NoR~H/soU~'H ........ ~ EAST/WEST i ........3_809 .............. 3.760,5~ ........... 3700,00 ................. 186 3927 3860.5q 3800.00 230.16 S 285.55 E 4051 3960.54 3900.00 280.68 S 338.18 E 4176 .......... ~..060,54 ........... 4000,00 332,85..S ............... 3.~3.1 ~301 4160.5~ ~100.00 38~.63 S 446.21 E i ~426 4260.5{ q200.O0 q36.27 S ,- 499.99 E , ...... ~55.0 ............ ~3~0.54 .......... ~O0.O.O ......... 48s.i5 s ........... 55R...~9' E ~67~ ~460.54 4~00.00 559.S2 S 60~.88 E ~797 4560,54 4500,00 590,08 S 656,55 E 49[1 ~6.60,5..4 .......... 4600,0..0 ............... 641,27S 707,27 i 50~4 ~760,5~ ~700,00 692,76 S ........ ~ 5167"- 4860,54 4800,00 744,39 S 806,83 L ....... 52~.9 ......... 4960,54 .......... 4900,00 ................... 795,68 .... s ............ 8.51~.,~1: E 5011 5060.5~ 50o0.00 e~7.~5 s 901.~1 E 5532 5160.54 5100.00 ~9~.22 S 947.15 565.3 .......... 5260,5~ ............ 5200,00 ........... 950,80...S ............ 99~,99 5774 5360,54 5300,00 1002,76 S 1035,06 i 5894 5460,5~ 5400,00 1054,67 S 10'77,~3. [ MD-TVD VERTICAL 67,10 90,89 116,04 18.9.~7 213.82 237.29 260,56 283.,.81 · . $0~,62 :':328'. 70 18.48 23,79 25.15 2 ~... 8 0.:?:,'::ii: ?' e :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 24 2.3.95 2;3.47 23.26 2 ,.3.2 22.81 22.09.' f 350.53 -372.23 393.35 21,825 21,70 21.12 2 0 · 3 7":'_':::'::'':':>'':''':' ..... 6015 5560.54 5500.00 1106.81 S 11-20.06 E SOHIO ALASKA E-20 (SEC 6 PRUDHOE BAY · .A LA.S K ~ PETROLEUM TI 1N RlqE) COMPANY SPERRY-SUN WELL SURVEYING COMPANY PAGE ANCHORAGE, ALASKA ........................ DA.TE .... O.F_.S. URVF_Y_D.EC_EM~E_R_2Z.,_i_~81 CC¢,~PUTATION DATE DECEMBER 22, 19A1 JOB NUMBER BOSS-16947 OPERATOR-THOmAS d MCGU~RE INTERPOLATED VALUES FOR EVEN 100 FEET_ OF..SUB._-.S.~_....DER_T__H TRUE ~MEASURED .... VERTICAL DEPTH DEPTH SUB-SEA TOTAL .VERTICAL ..... RECTANGULAR . COORDINATES .......... MD.~_~.D ............... ~.EAT~CAI DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION i~ 6136 5660 6256 ;760 6376 5860 ...... 6495 ........ 5960 6615 6060 673~ 6160 .685~ 6260 6975 6360 7095 6~60 .... 7216_ 6560 7335 6660 7453 6760 7570. 6860 7687 6960 7803 7918 .... 8033 8149 ........ 8265 · 54 5600. .54 5700. · 54 5800. · 54 5900. · 5~ 6000. .54 6100. · 54~ 6200. · 54 6300. · 54 6~00. · 54 6500. .54 6600. · 54 6700. · 54 6800. · 54 6900. 7060.54 7000. 7160.54 7100. 7260,5~ 7200, 7360,5~ 7300. 7460,54 7400, O0 O0 O0 O0 O0 O0 00.· O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 1159.17 S 1211.15 S 1262.58 S 1313,01 S 1365.51 S 141~.84 S 1465.89 S 1517,57 1569,37 1620,8~ 1671.06 1719.91 1767,38 181~.90 i859.~1 S 1905,77 S 1947,73 S 1993,33 S 20~0,38 S 1162 · 95__ E ............. ~._7_5..,_69 . . 1205,4q E z~ 96, lZ~ 12~6,85 E 515,96 1287, 90_F 1328,65 E 554.4& 1570,17 E 57~,29 1455.02 E 61~.,51 1498.15 E 655.21 1540.82_ E' .6_o_5...50__ 1582.41 E 674.88 1621.99 E 693,01 1660,97..~E ................. 7.10,~7_ 1699, 13 E 727,08 17~6,20 E 743,03 1772,05.._E ................ Z58,.i.6 1806,97 £ 772,84 1842.88 E 788.~6 20_,_7~ 20,~5 19,83 L9_,29 19,21 19,83 20.52 20.60 20_..2__9_ 19.38 18.13 1.7_...3.6 .............. 16,71 15,95 L5.~2 1~.68 15.63 1880.0~ .... E ............. 805..06 ...................... 1&.5_O i sPERRy-SuN` WE'L~"S"ORVEY'INGi COMP!AN¥::~'.' :.: .:..: :' ::' ~' ~? PAGE 10 !..S,.QHI_Q..AL.A_SKA...PETROLEUM..CO.,M,PA_N~ .............. i.:~ .:i: i'.DATE'"OF SURVEY*DECEMBER ,21, 1981 ~ E-20 (SEC 6 T11N RZqE) COMPUTATION DAT'E PRUDHOE BAY DECEMBER 22, 198,1 dOB NUMBER BOSS-169q7 F_..A_L.~S_K_A,__ KELLY BUSHING ELEV. = 60.5/+ FT. i . ' : ' 'i:':' "":/:!~ ~!::.:: ~;.; :!::':;:i: :' OPE R A T 0 R' T H 0 M A S.::,J ;;:.' M C GU I. R E [.~L. ..................................... !,.N.TER.pOLATED' VALUES FOR EVEN` 1..oo...F,.EE.T_OF SUB-SEA:DEPTH TRUE SUB-SEA TOTAL ,.ME A S UR E D_ ........... _,VE R T I C A L .......... _VE:R II C.AL ....... RE C T A NG ULA R ,_~.O. ORD !_N A.T ES !-DEPTH DEPTH DEPTH t MD-T'VD' VERTICAL .............. 8.381 .............. 7.56.0.5/+ ......... 7500.0 8q97 7660.5/+ 7600.0 8613 7760.5/+ 7700.0 __8729 ....... ~860..54, ......... 7.8.0.0-0 88q6 7960,5/+ 7900.0 8965 8060.5/+ 8000.0 ........... 9082 ........... 8160 9203 8260 NORTH/SOUTH'.' : EAST/I4EST DIFFE:RENCE::::{?::::~.:::CORREPT'I.ON ....ii..?i;~ii.:i:i:!:..::i:i.:.;:::'.~.:· 2087,60 S ........ :.,..1.9~6,07 E : " 8..2. :...1'.!.3.? -.: :. ,:. __16,31 0 .......... 213q.9/+ S 1950-.'71 .... E 857.31 0 2181.93 S 1984.18 E 852.76 0 ................ 2231...06 .... $ .......... 2013~.05 E 868.93 0 2282.30'S. 20/+9.38 E ', ::;!::.i. 885'85.'. ' ..: 0 2,335.27 S 2080.30 E ::' ii!:i:i:7903":17 i' :.. .:.~. ..., 0.0 ..00 ........ 91.371S 2,110 '" 8200.00 2452.52 S 21ql.51 E 9/+3.01 15 15 16 16 17 18 .9/+ .17 .55 : ?.?i.i~..~i':i: 21.29 9327 9/+53 9579 9707 9R37 ........ 9o. 71 10105 ....... 1.02qO ......... 102,65 T H.E ..C A._L C UL THE NEA 8360 8560 8660 8760 8860 8960 9060 9078.90 0 2518.71 S 2172.09 E 966.79 0 2589.55 S 2200.9/+ E 992.70 8500.00 2662.05 'S 2227.90 E :' 8600.00 2737.03 S 225/+.10 E ':. 8700.00 2816.93 S 2279.89 E ::..~-'1"0:'.7'7./+2: ~ · 5/+ 8300.0 · .5/+ ............. 8400 · 0 .54 .5/+ 23 27 50 8800.00 2900.49 S 2.308.86 E 1110.92 8900.00 2985.06 S 23.58.70 E 11~5.24 9000.00 ........ L ............ 30.70,0.3 ._.S_ .......... 2368., 2.9..~E 1179.76 9018.36 3085.6.% S :12373.72 E $'1::0 ATION PROCEDURES USE'A REST 20 FOOT MD (FROM CURVATURE) POINTS RADI US OF .78 .91 ,50 ,32 ,52 Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. Operator, Well Name and Number Reports and Materials to be received by: !- /~ Date Required Date Received Remarks Completion Report Yes / Well History Yes / , _Samples - ., , Core Chips m 0 ~ ~_ - . Core Description ~ O~ ~ Registered Survey Plat 7 e~ / . Inclination Survey /~ ~ · I- / ~ Directional.. Survey. .~.~C=~, ~ -- P/ Drill Stem TeSt Reports ~. 0 ~, ~ ~/~. production Test Reports ~ ~~ ~,_____~_.., ., , ~ ,.~ · Logs, Run. Yes / ~. )g_.g ~... ~, & ~_~? Digitized Data ~ ~__~.~ · BP EXPLORATION BP Exploration (Alaska} Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 09/08/89 Transmittal: 80345 Prom: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-23 PROD-F 08/25/89 E-02 PROD-F 08/25/89 E-24 PROD-F 08/24/89 E-16 LEAK DETECTION 08/26/89 E-20 PROD-F 08/24/89 G-04 PROD-F 08/29/89 J-24 PITS 08/28/89 W-04 DTL 08/28/89 W-04 PROD-F 08/26/89 X-04 GAS LIFT 12/20/84 Sl $1 $1 $1 $1 $1 $1 $3 $1 10150-10460 Camco 5" 9650-9939 Camco 5" 10350-10668 Camco 5" 5400-8300 Camco 2"/5" 9800-10145 Camco 2"/5" 10000-10308 Camco 5" 11200-11594 Camco 5" 11750-12197 Camco 5" 11750-12180 Camco 5" 2500-10053 Camco 1"/5" DistribUtion: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERVOIR ?ETA ARCHIVES Alaska Oil & Gas Co:s. Commiss o,? Anch0ra~e SOHIO RESTRICTED SOHIo ALASKA PETRoLEuM COMpANy ; TO: 31 ] 1 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907J 265-0000 MAIL: POUCH 6-6 ~ 2 ANGHORAGE, ALASKA 99502 Date: 1111/82 STATE: 1111/82 The foIlo~'ZO FINAL ~." "~ ~ _ W,ng mater,al ,s beinb"~ubm?t~.~ ~ 20 copy of ~u nerewith. Please acknowledge receipt by Signing a this letter and returning it to this office:_ OPEN HOLE FINAL E-20 DIL/SFL E-20 LOGS ' BHCS -~0 FDC " ,i 12/8/81 & 12/12/81 FDC/CNL ,; 12/12/81 ¥/l& 2 ........ . ,, 12/12/81 //2 '- 12/12/81 STATE ONLy: ....... .. .,~ '~- '- . ................ //2 E-20 DIRECTIONAL SURVEYs. E-20 Magnetic Single Shot Survey GYroscopic Survey 11/29-12/8/81 12/21/81 ., 5" Jo b ~~Al 281- 008 ao / 69 7 ~9 CommlsSlOrl Al3ska 0il & Gas Cons. Anchorage De V ~~. Ceolo~y Well yrds ' SOHIOALASK~~ EIROLEUM COMPANY SOHI0 RESTRICTED - 3111 "C"STREET ANCHORAGE. ALASKA TELEPHONE(907) 265-O000 TOt. · ARCO EXXON PHILLIPS MAIL: POUCH 6-612 ANCHORAGE, ALASKA 9950:~ Date:. 1/14/~ 1320 Page 1 of 2 * A-19 V/ '(Sch) '- * B-.8 -'.9, CH-CNL t/62356 * D-1 " CH-CNL t/62436 * D-3 ~'"" " CH-CNL #62367 * n-4 ~// " CN-CNL #62437 * E-20~ " OH-DIL/BHC/FDC/CNL t/62366 * E-21 " OH-DIL/BHC/FDC/CNL #62332 * F-2/ " CH-CNL t/62440 *'F-16 ~'/ " OH-DIL/BHC~FDC/CNL #62423 * J-l~/ " CH-CNL t/62433 * ~-5~ " CH-CNL #62427 * J-8 " / CH-CNL #62430 * M-13~ " CH_TDT. #62455 * M-14 v' " CH-T.DT #62454 SFO ' REFERENCE: /~ SOHIO MAGNETIC LIS. TAPES & LIST.IN__G_S' The followin§ material is being submitted herewith. Please acknowledge receipt by signing a cody of this letter and returning it to this office:- SOHIO MAGNETIC LIS TAPES AND LISTINGS ON THE FOLLOWING WELLS: OH-'DIL/BHC/FDC/CNL~' #62422 ;' ', '" i2/2i/8i i2/2i/8i i2/26/81 i2/ii/Si 12/27/81 12/12/81 11/19/81 12/23/81 12/22/81 12/22/81 12/19/81 12/20/81 12/31/81 12/29/81 (con' t) ' ~ ' .-- r JAN 1 5 1982 DATE 19 Carol KraZy Developm Alaska0il & Gas Cons. Commission Well Reco 4-5 Anch0ragm Thru: ALASKA OIL AND GAS CONSERVATION COMMISSION Hoyle H. Hamilton/~ Chaiman Commissioner Doug Amos Petroleum Inspector December 16, 1981 Witness mOPE Test at Sohio ' s E-2_~el 1 seC~ 6'~;~T11N, R14E, U.P.M. Permit No. 81-39 on Nabors Rig No. 22E Monday November 30, 1981 - I traveled this date from Shell's West MikkelSen' unit' %~3 weii-~° $ohio's E-20 well to witness the mOPE test. The test commenced at 12:30 p.m. and was concluded at 7~30 p.m. There were no failures and I filled out an A.O.G.C.C. mOPE test report which is attached. In summary I witnessed the successful mOPE test on Sohio's E-20 well. I filled out an A.O.G.C.C. mOPE test report which is attached. 4/8o ' . .ALASYJ~ OIL & GAS CC):''i:~WATION COMMISSION -' B.O.P.E. Inspection Report · Inspector Operator Representative · Well ~-~0 Permit ~ .% - Location: Sec ~ T II~ RI~-ti ~ ~ l~asing Set 0 ~~' ft. Drilling Contractor ~~~ Rig ~ ~Representativa~~/~ ............................ Location, General Well Sign General Housekeeping Reserve pit Rig . BOPE Stack Pipe Rams // Blind Rams.,~ ~ / Choke Line Valves j l .,~ I H.C.R. Valve ,, j ~,z , / J Kill Line Valves .Check Valve ~' / ~ '.___. Test Results: Failures Tea t PresSnare / · ACCiJtlU IJV!'OR SYSTEH Full Charge Pressure ,~L~f%L-~ psig Pressure After Closure. /~J) psig 200 psig Above Precharge Attained: rain /~sec Full Charge Pressure Attained: / rain,sec Controls: Nas~e~ ~. Remote O~ B~nds sw~ch cover ~ Kelly_ and FloOr Safety Valves: /'~Tes t.. Pressure~ ~st Pressure Test Pressure upper Keliy Lower Kelly. Bal 1 Type Inside BOP / Choke ' Manifold .No. Valves Test Pressure .......... / Test Pr~su~'e N'0. flanges Adjustable Chokes llydrauically operated choke_ , ......... :: : ::.- ~ . ._:.zz;~;_-z., ~ ..... o r _z_~: .... - .............. - ---- ...... ~ Test Time --7 ' hrs. (~,'i"~ ., .... days and Repair or Replacement of failed equipment to be made within · Inspector/Commission office notified. !'. 111 Distribution orig.- - AC&GCC cc - Operator cc - Supervisor Inspector. ALASKA OIL ~D GAS CONSERVATION COMMISSION Hamilt ~o Hoyle H. Chairman ~f~/... THRU :Lonnie C. Smith Commissioner . Bobby Foster i j~<~ ~ '. · Petroleum Inspector December 7, 1981 Witness Retest of BOPE 8~ on Sohio'_.~_.E.2_0 ~ Sec. 6 TllN,R14E, UPM Permit %81-39 Wednesday, December 2, 1981: While standing by to witness the BOPE test on Arco's DS 15-14', Bill steuble, Sohio drilling foreman, contacted me and said he w~ ready'tO retest., the BOPE stack. The stack was tested, 12/1/81 by Doug Amos, .but was nippled down to perform another cement job~0n the 13 3/8 casing.. Apparently £he float collar h.ad plugged during ~he first Cement job'and according to the calculations made by Doweil and sohi0..rep~esentatives, 290 bbls. of cement had cleared the sh0e~." After nippling up the BOPE stack an4 starting in the hole, gree~Cem~t'was enc0~tered,' ~The.cement was washed and drilled out tO ~h~ ki6At 601iA~. A st~in tool was run after nippling down the ~Q~ ~Ck, stabbed in to the collar and another cement ]ob was ~~ B%l!~ said good cement returns were received at surface. In summary, I witnessed th~ retest of the BOPE~stack only on Sohio ' s E- 20. BF .. vdl ': i?,..!,:: i:? STi,'r,.: ".':'";,~.^S}:a " ' "A~SKA OIL & GAS. CO~i:[ERVA_TIOIi COMMISSION ":""¢?"::"?:~ B.O.P.E. InspectiOn' Report L°c~tion, 'General Welt Sign General Housekeeping ~,(~. 'Reserve' pi t Check Valve BOPE Stack Annular Preventer Pipe Rams Blind' Ram's Choke Line Valves H.C.R. Valve Kill Line Valves., Test Results: Failures Repair or Replace!.nent of Test Pressure . . Date /~___C7 _~. __ f9/ R epr'~ntative -/'~,'!i Permit" ~/ -- ~g . /3~asing Set ~&'~¢~ ft Represents. tive . ACCU:IU]~,TOR SYSTEM ps ig Pressure After Closure psig 200 psig Above Precharge Attained: min Full Charge Pressure Attained: min Controls: Master 'Remote Blinds switch cover ~/ Test Pressure Test Pressure Test Pressure Test Pres sure Test Pressure Kellv. and Floor' Safe_tv Valves Upper Kelly. Lower Kelly Bal 1 Type Ins ide BOP Choke Manifold Mo. Valves No. flanges I Adjustable 'Chokes. __t J.' ~ ~u'~ c~, ~ ~ ~ o?f ~!t_,f.~...ch_.o_~A .... - .-ur ._- :-=_- ....... Test Time hrs. fail. ed equipment to be made within, days and Inspector/Commission office notified. ' Remarks: '7~'/. ~ ~ ~---- , './iFil d ~.:.'",cT ~..J /c'.D/Cfc.2_/.'y/r/~Z'-.'~r~.,,x,~,il~, ~ ' · .... ""~. ' ..--/ .~--..-,:..x x...,,?.~: ' ...J,..::,, ,,J ,". " : ' . Distribution orig] - AO&GCC cc ,- Operator cc - Supervisor Inspector ~.~ · / 4 November 13, 1981 Mr. R. H. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Res Prudhoe Bay Unit E-20 Sohio Alaska Petroleum Company Permit NO. 81-39 Sur. LOC.~ 1743~SNL, 883~WEL, Sec 6, TllN, R14E, UPM. ( CORRECTED ) Bottomhole LOC. l 725~NSL, 1663~EWL, Sec 5, TIIN, R14E, UPM. ( CORRECTED ) Dear Mr. Reiley~ Enclosed is *the approved revised application for permit, to drill the above referenced well. The provisions of the cover letter, dated March 23, 1981, accompanying the original approved permit .are in effect for this revi sion. Very truly yours, ~oyl"~ .~. H~ilton Chairman of A~s.~ Oil & Gas Conser~tion Co~ission Enclosure cc~ Department of Fish & Game, Habitat section w/o encl. Department of Environmental Conservation w/o/encl. aha SOHIO ALASKA PETROLEUM COMPANY November 6, 1981 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907; 276-511'1 MAIL: POUCH 6-6~i2 ANCHORAGE. ALASKA 99502 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well E-20 (24-05-11-14) (Permit #81-39) Enclosed, in triplicate, is Form 10-401, Permit to Drill (Revised), for the above-named well. This revision shows the newtarget and bottomhole locations. Also enclosed are the revised program outline and revised surveyor's plat. If you have any questions, please call me at 263-5183 or Ted Stagg at 263-5173. Yours very truly, RHR: ja District Drilling Engineer Enclosures cc: Well File #17 RECEIVED NOV ~'~ 9 l~ltl A~ask~ 0il & Gas Cons. Commission Anchorage [ STATE OF ALASKA ~,". ALASKA ,L AND GAS CONSERVATION C ,MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL [] lb. Type of well EXPLORATORY I'-1 SERVICE [] STRATIGRAPHIC [] REDRILL [] DEVELOPMENT OIL~ SINGLE ZONERS] DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 9. Unit or lease name 1743' SNL, 883' WEL, Sec. 06, TllN, R14E, UPM Prudhoe Bay Unit At top of proposed producing interval (target) 10. Well number 850' NSL, 1550' EWL, Sec. 05, TllN, R14E, UPM (Corrected) E-20 (24-05-11-14) At total depth 11. Field and pool 725' NSL, 1663' EWL, Sec. 0.5, TllN, R14E, UPM (Corrected) Prudhoe Bay 5. Elevation in feet (indicate KB, DF etc.)~ 6. Lease designation and serial no, Prudhoe Oil Pool Est. KBE = 60 '_ AMSL ADL 28304 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number Sa5eco ];ns. 2975387 AmOunt $200,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed N-W o~: Deadhorse l0 miles ~d~)L 28_30.3 3617 feet well ~,-5 2070 feet., 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 10230'MD 9110'TVD feet 2469 November 22, 1981 , 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures .3.3.30 psig@ Surface KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 34 °l(see 20 AAC 25.035 (c) (2) . 4390 psig@ 8800ft. ~ (TVDkc, . 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 36" 20X30 Insula':ed Con(luctor 110' Surface 110'I 110' 8 cu.yds, conCrete 17 1/2 13 3/8 72# L'80 BUtt. 2680' Sur~ace 2680'~1 2680' 3720 cu.ft. Arcticsetl 12 1/4 9 5/8 479 L-80 Butt. 9290' Surf~ace 9290'1 8330' 1300 cu.ft, class'G'; i I 130 cu. ft. ArCticset 8 1/2 7 26# L-80 IJ4S 1440' 8790' ~, 7916' 10230'11 9110' 355 cu. ft. Class' G 22~ Describe proposed program: W/18% salt See attached proposed drilling program outline. RECEIVED NOV 0 9 1981 ;Alaska Oil & Gas Cons. Commission Anchorage 23. I hereby certify that the foregoing is true and cor~.ct to the best of my knowledge '7, The space below for Commission use a. H. Reiley CONDITIONS OF APPROVAL Samples required Mud log required I Directional Survey required I APl number r-lyES Q~No []YES ~,.O RES I-lNGI 50- 0 Permit number Approval date ~¢/_j ~ .~c-,~J-~/ I SEE COVER LETTER FOR OTHER REQUIREMENTS ~,~~~~ ~ ,COMMISSIONER DATE APPROVED BY I · ' by order of the Commission Form 10-401 Submit in triplicate Rev. 7-1-80 PROPOSED DRILL~ AND (//4PLETION PRDGRAM WE~Z. E-20 (24-05-11-14) Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 8 cu.yds, concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Arcticset II cement. Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to 8330' TVD. Run 9 5/8" 47# L-80 But- tress casing to 8330'TVD and cement first stage with 1300 cu.ft. Class G cement. Cement second stage through D.V. packer collar at 2600' with 130 cu. ft. Arcticset I cement. 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Drill 8 1/2" hole to T.D. at 9110' TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 355 cu. ft. Class G cement with 18% salt. Run 4 1/2" 12.6# L-80 A/B mod. Buttress IPC tubing with'~gas lift mand- rels and a production packer assembly at 7875' TVD. A subsurface safety valve with dual control lines will be placed at 2100'. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. NOV 0 9 ]98] Alaska Oil & Gas Cons. Commission Anchorage TRIPLE RAM 5000 PSI WP DRILLING KILL LINE ANNULAR PREYENTE ,I CH ECX: GATE GATE I PIPE RAMS I I BLIND RAMS DRILLING SPOOL PIPE RAMS I I CHOKE LINE GATE HYDR. ASST. GATE NOV 0 9 1,98T~. Oil A Gas CoDs, ADchora~je L._ 4109' I I ~ , ~3~Y LA~ : 70°20 8 ; ':~ ' ~ t652' , ' J o ,2 · ,, aa : _ I - I ' ~ ~ /E Y :5,~,'6,164 ~ 6 I ~1 '' ~1 - ~[ ' I ~ ..................... :-~-~t'~ "-"z>-[~;~"~, ~ I 03 ' ~ ' ' ~-/~ ! ~1 ~ - ~~,o ~-/~ I 04 ~ I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my suDervision, and that all dimensions and other details are correct. h295 --~180 -~ NE COR. PAD ,1/'[44.05-//. ,laf'AZ. 07-//-/4) CAMP 3001 ~.. ! ~. ,,4e5. 5 ' _PAD DETAIL Scale I" = 500'- PORTION OF T. IIN.~R. 1:5 6 14 E. sca~el":~/2 Mile T. 12N, R. 1581 14 E _l ' ~ '~, -- V~'~-z.. Date SURVEYOR REMOVED (PROPOSED) BHL E-:)2 (REVISED TO PROPOSED BHL E-15). REVISED (PROPOSED) E-18 & E-19 LOCATION ADDED ACTUAL E-16,8800' SUB SEA. ADDED (PROPOSED) E-18 & E-22 BHL; REV.(PROPOSED) E-17 & E-21 BHL ADDED (PROPOSED) ~-21 BHL ADDED (PROPOSED) -20 BNL ADDED (PROPOSED) E - 19 BHL ADDED PAD EXTEN810N 8W COR. TO. PLAT ADDED PAD EXTEN$10N TO PLAT ADDED(PROPOSED)E-17 BHL (FORMERLY PROPOSED E-ID BHL) ADDED (PROPOSED) E- 16 ADDED ACTUA_ E-6 8800' SUB SEA ADDED ACTUAL E-5, E-4 ~E-5 8800' SUB SEA ADDED E-6 (PROPOSED) 8800' SUB SEA ADOE D E- ;' (ACTUAL) 8800' SUB SEA 8 ADDED E- 5 (PROPOSED) 8800' SUr:~ ~,~. A ADDED E- 4 ( PROPOSED ) REVISED E-3(PROPOSED)8 WELL HOLE NUMBERS REVISED WELL HOLE NUMBERS REVISED (PROPOSED) E- 3 LOCATION ADDED (PROPOSED) E~4 REVISED E-I AND ADDED (PROPOSED} TOP SADLEROCHIT (PROPOSED) E-I,E-2 8800'SUB-SEA ELE¥. 9/23/81 9/I /81 7/IS/8 I 7/.15/.81 3110/8 I S/3/81 $/3/81 I/s/el I1 5 I81 4/22/80 .~ ';4/?6 .). 'L',.' ' 75 ~'~ 2 7'5 ~.'24 . 5 P.J.R. P. J.R. P.J.R. P.d.R. D. H.O. D. HO. P. J.R. P. J.R. P.d.R. C.J.R. C.J.R. C.F.G. C.J.R. 3. J_r Cji. c J R 'JR. CJR 3 ,, R. C.J.R. PAD"E" Located in YE: I/4 PROT. SECTION 6~ T. IIN.~RI4E. UMIAT MERIDIANI ALASKA Surveyed for B P ALASKA INC. Surveyed by F M. LINDSEY t~ ASsoc. LAND "B HYDRoGRAPHiC SURvEYo'R$ 2502 West Northern Lights Boulevard Box 4-.081 Anchorage Alaska E-6 4s~d..rvp £-2o 3~ WELL 1"= I00~ £-z 4 E-'3..o ~5 ~o'?vo t March 23, 1981 Mr. R. ~. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Re: Prudhoe Bay Unit E-20 Sohio Alaska Petroleum Company Permit No. 81-39 Sur. Loc.: 1743'SNL, 883'WEL, Sec 6, TllN, R14E, UPM. Bottomhole Loc.: 122'NSL, 1298'EWL, Sec 5, TllN, R14E, UPM. Dear Mr. Reiley: Enclosed is the approved application for permit to drill the above referenced well. well samples and a mud log are not required. A directional survey is required. If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Department of Fish and C~me. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to Mr. R. H. Re iley Prudhoe Bay Unit E-20 -2- March 23, 1981 com~ncing operations you may be contacted by a representative of the Department of Environmenta! Conservation. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a repre- sentativ~ of the commis.sion may be present to witness testing of blowout preventer equipment before surface casing shoe is dri 1 led. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, ~. Hamilton Chairman of BY ORDER OE THE Alaska Oil & Gas ConservatiOn Commission Enclosure cc~ Department of Fish & C~ame, Habitat Section w/o eric1. Department of Environmental Conservation w/o/encl. SOHIO ALASKA PETROLEUM COMPANY March 17, 1981 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAG E, ALASKA 99502 CONFIDENTIAL Alaska Oil & Gas Conservation Conmnission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well E-20 (14-05-11-14) Enclosed are the following documents, in triplicate, along with our check'for $100.00 to cover permit filing fees. 1. Application for Permit to Drill, 2. Proposed Drilling Program Outline, 3. Blowout Prevention Equipment Diagram, 4. Surveyor's plat showing well location, 5. Directional plan. RHR:ja Enclosures cc: Well File ~17 Yours very truly, ~/R. H. Reiley District Drilling Engineer RECEIVED ! 9 1 8.1 STATE OF ALASKA ALASKA (~ AND GAS CONSERVATION COI~i~,ISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [-] DEVELOPMENT OIL I~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE [~ MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at sUrface 1743' SNL, 883' WEL, Sec.06, TllN, R14E, UPM At top of proposed producing interval 370' NSL, 1140' EWL, Sec. 05, TllN, R14E, ~ At total depth 122' NSL, 1298' ~EWL, Sec. 05, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. KB~ 65' AMSL I ADL 28304 9. Unit or le.~se name Prud~e Bay Unit 10. Well number E-20 (14-05-11-14) 11. Field and pool Prudhoe Bay Prudhoe Oil Pool 12. Bond B (see 20 25.025) information AAC Type la~ket Surety and/or number Safeco Ins. 2975387 Amount $200,000o00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed. N~ Deadhorse 10 miles ADL 28303 3982 feet well ,:E~.5 2716 feet 16. Proposed depth (MD & TVD) 10520' MD 9290' TVD feet 17. Number of acres in lease 2469 19. If deviated (see 20 AAC 25.050) [ 20. Anticipated pressures KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 35.1q (see 20 AAC 25.035 (c) (2) 18. Approximate spud date May 18, 1981 3330 psig@~ Surface 4390 , psig@ 8800 ft.~ {TVD) Proposed Casing, Liner and Cementing Program SIZE Hole I Casing 36" [30x20 17 1/q 13 3/[ 12 1/~ 9 5/[ 47% 8 1/2'1 7" ,29% 22. Describe proposed program: -, CASING AND LINER Weight Grade I Coupling ] Length Insulab .,d Condgctor [110 L-SO { Butt.I 2680 72% Butt. 9575 L-80 / Butt.I 1445 MD TOP SurfaCe SurfaCe Surface I SETTING DEPTH I 9075 18100 TVD See attached proposed drilling program outline. MD BOTTOM TVD 110 ~110 !2 80 9575 118510 I ,/0520 119290 QUANTITY OF CEMENT (include stage data) 8 Cu.ydS. 3720 cu. ft, 1345 cu. 130 cu.ft. Arctic Set 275 cu.ft. Class G RECEIVED MAR 1 9 1981 Alaska 0ii & Gas Cons. Commission Anchorage  ~orrect to the best of my knowledge 23. I hereby ~ertify that the foregoi SIGNED (~J~- ~'"' \ ~L ~C~ TITLE District Drilling Engined~LATE The space below for Commission use CONDITIONS OF APPROVAL APl number' Samples required []YES ~NO Permit number APPROVED BY Mud log required DYES .[~'N O Approval date 03/23/81 Directional Survey required J~YES i-]NO 50- O'~ - ~o S~7G SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMM ISSl ON ER DATE by order of the Commission lVh~'~.h 23¢ l qR1 _ Form 10~,01 Submit in triplicate Rev. 7-1-80 p~~D DRILLING AND CCMPLETION P~. WELL E-20 (14-05-11-14) Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 8 cu. yds. concrete. Drill 17 1/2" hole to 2700'and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Arctic Set II cement. Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss (based on original reservoir pressure). Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600 'TVDss and an oil column to 8800' TVD. Directionally drill 12 1/4" hole to 8510'TVD. Run 9 5/8" 47# L-80 Buttress casing to 8510 'TVD and cement first stage with 1345 cu. ft. cement. Cement second stage through D.V. packer collar at 2600'+ with 130 cu. ft. Arctic Set I cement. 9 5/8" casing will be hung at surface, the-9 5/8" x 13 3/8" annulus will be Arctic Packed. Drill 8 1/2" hole to T.D. at 9290' TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 275 cu. ft. Class G cement with 18% salt. Run 5 1/2" 17~ IJ4S IPC tubing with gas-lift mandrels and a production packer~ assem- bly at 8060' TVD. A subsurface safety valve with dual control lines will be placed at 2100 ft. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed per- forations to be submitted on Sundry Notice to follow. B.O.P. STACK CONFIGURATION 1:5 /8" TRIPLE RAM ST(~ -- 5000 PSI WP DRILLING ANNULAR PREVENTER PIPE RAMS CHECK KILL HAND GATE LINE GATE BLIND RAMS DRILLING SPOOL HAND GATE HYDR. ASST. GATE PIPE RAMS i_ 04 O2 fl4 . NE; COR. PAD I1' [ ~I~1- O,f - II- 14) L CAMP :300' _ 1__ 485.5' 4 PAD DETAIL- _ Scale I" = 500' PORTION OF T. IIN.~ R. 1:5 8 14 E. Sca~el"=~/2 MUe T. 12N, R. 1:5 8 14 E I hereby certify that I am properly registered and licensed to practice land' surveying in the State of Alaska and that this plat represents o location survey made by me or under my suRervision~ and that all dimensions and othej~,~ details are correct. , Dele SURVEYOR A- 12363 - 81 PAD"E" Located in Surveyed for B P ALASKA INC. M.L ADDED (PROPOSED) E-20 BHL ADDED (PROPOSED) E- I~ BHL ADDED PAD EXTENSION SW COR.TO.PLAT ADDED PAD EXTENSION TO PLAT ADDED (PROPOSED)E- 17 BHL (FORMERLY PROPOSED E-ID BHL) ADDED (PROPOSED) E - 16 ADDED ACTUAL E-6 8800' SUB SEA ADDED ACTUAL E-3, E-4 ~E-5 8800' SUB SEA ADDED E-6 (PROPOSED) 8800' SUB SEA ADDED E-2 (ACTUAL) 8800' SUB SEA 6 ADDED E-5(PROPOSED) 880~J' SU[~ qt A ADDED E-4 (PROPOSED) REVISED E-3(PROPOSED) 8~ WELL HOLt[ NUMBERS RE.VISED WELL HOLE NUMBERS REVISED (PROPOSED) E-:5 LOCATION ADDED (PROPOSED) E-4 REVISED E-I AND ADDED (PROPOSED) 1[-5 TOP SADLEROCHIT (PROPOSED) E-I~E-2 8800'SUB-SEA EI_F,.~. 3/10/81 3/3/81 D, H.O. $/3/81 D.H.O. /81 P.J.R. 4/22/80 P,J,R. 4/ 6 '76 C.J.R. F 'Z4/76 CJ.R. I / 3/76 C.F.G. I_~/ 2 '75 C.J.R I~. '.,'?S ;.J,R ~,,'~4 75 C d .).'~,2' 75 C. J R I., ~;,','~ 'J R, t.,~ 3 75 C j R Surveyed by EM. LINDSEY & ASSOC, LAND ~ HYDROGRAPHIC SURvEYO'R$ ~,'24 ,5 ~ ,' R, ' ~ ~5 C.J.R, 2502 West Northern Lights Boulevard Anchoroge Box 4-081 Alaska · ~'-2. O 7'1/~> , .o ._ VV/~. &.L. ~ ]7~-S' ' 9-V'D TVD 3766' F-18 'TvD ~r3 78' E-7 TVD "7 ~ ~ EZ° I CHECK LIST FOR NEW WELL PERMITS I~ase & Well No. ITDM APPROVE DATE (1) Fee ('~ '~ -! ~--~'/ _ ,/ (2) Loc. ~..~ "J,~t~, ~! (3) Admin ~~ (ge u 11) e 10. 11. YES NO 1. Is the permit fee at~ached ......................................... 2. Is ~11 to be located in a dmfined pool ............................. 3. Is ~11 located proper distance frcm property line .................. .<~ 4. Is v~ll located proper distance from other ~lls .................... 5. Is sufficient undedioated acreag~ a~ilable in this pool ....... - ..... 6. Is V~ll to be dmviated and is ~11 bore plat includmd ............... 7. Is operator the only affected ~arty ................................. 8. Can permit be approved before ten-day mit .......................... ~-~ Does operator have a bond in force .................................. Is a conservation ordmr needed ..................................... Is administrative approval needed ................................... (12 thru 2b)' ~ 13. 14. 15. 16. 17. 18. 19. 20. (21 thrd 24) ~- 22. , ~" 23. 24. 25. Is conductor string provided ........................................ ~ Is enough cement used to circulate on conductor and surface ...... Will cement tie in surface and intermediate or productiOn strings __ Will cement cou~r all known productive horizons ................... ' ~__ Will surface c~sing protect fresh ~ater zones ....................... ~ Will all casing give adequate safety in collapse, tension and burst.. ~ . ,, , Is this roll to be kicked off from an exiating mllbore ............. , Is old mllbore at~ndonmnt procedure included on 10-403 ............. Is adeqmte roll bore separation proposed ........................... ~,~, · Is a dimrter system required .......... , ......................... ,... ~ Are necessary diagrams of diverter and BOP equipment attached ....... ~ ..... Does BOPE have sufficient pressure rating - Test to ~o psig .. ~ Does the choke manifold comply w/API RP-53 (Feb. 78)'...., ............ __ A~ ~ . Additional requiren~nts ............................................. Additional Remarks: , ology: rev: 03/10/81 ..... INITIAL ': GEO. UNIT' iON/OFF POOL CLn~S STATUS AREA NO. SHORE CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE (1) Fee -/~. //- ~f! ~-~t (~ thru 1. Is the permit fee attached ............................ 2. Is well to be located in a defined pool ........... '' '' ' 3. Is well located proper distance from property line 4. Is well located proper distance from other wells'.. 5. Is sufficient undedicated acreage available in this 6. Is well to be deviated and is well bore plat included .. 7. Is operator the only affected party ......... ..........1''1''' ' 8. Can permit be approved before ten-day wait ..'''''''''.'."' '.' (3) Admin~~' // ~'f! 9. (~ thru 11) 10. 11. Casg~~ //-?~ ~/ thru 20) (5) BOPE (~~ ~21 thru 24) 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. (6) Add: eee · · · Does operator have a bond in force .................................. ( Is a conservation order needed ...................................... / Is administrative approval needed ................................... YES NO REMARKS Is conductor string provided ................... ' ............. Is enough cement used to circulate on conductor and surface . Will cement tie in surface and intermediate or production str Wil Wil Wil IS Is Is 1 cement cov~er all known productive horizons ........ ... · 1 surfa'ce casing protect fresh water zones .. '~... '.' 1 all casing give adequate safety in collapse, tension and this well to be kicked off from an existing wellbore ..... old wellbore abandonment procedure included on 10-403 .... adequate well bore separation proposed ................... ings burst eeeleeee ,,, ~ eeeeel·e Is a diverter system required ................... .~_p__ ~~-~ . c/-zo-%/ Are necessary diagrams of diverter ~g~ ~ eqglp g ; ...... ~ Does BOPE have sufficient pressure rating - Test to ~o psig .<~ _ Does the choke manifold comply w/API RP-53 (Feb.78) .................. , .... ~o~~:r~<~T~ Additional requi-rement s Additional Remarks: Geology: ' -- LCS. ~'BEW ~ ~~_'JKT Engi~n~r ~ng: JAL~ ~ RAD ~-- / rev: 03/10/81 ' INITIAL ..... GEO. UNIT' ON/OFF POOL CLASS STATUS AREA NO, SHORE. . ,. Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. ,. No special 'effort has been made to chronologically organize this category of information. ,o 515 TAPE VER]FICATIUN LISTING LVP O,J'-~.H{)5 VERIFICATIOi,,~ LISTING PAGE ** REEu HEADER ** SERVICE NAME :SWRVIC DATE :~1/12/~1 ORIGIH : REEL ~AME ;REEL ID CONTI~,~ATiON # PREVIU~IS ~EEL : COMNEN'!'S :REEL CONNENTS ** TAPE MEAOER ** SERVIC~: NANE :$ERVIC DAT~ :al/12/21 ORIGid :1070 TAPE H~%ME :62366 CONTI:~t!]ATI~]N # :0~ PREVIsionS TAPE : COMME::I.~S :TAPE COMMENTS ** F'I~: HEADER FILE NAME :SERVIC.O01 SERVIC;:: NAME VERSI~].~ ~ : DAT~ : FILE TYPE : PREVI,]~S ~'ILE CONTENTS CN : $()HIH ALASKA PETROLEUM COMPANf WN : E-20 FN : PRUDHUE BAY RANG: TOWN: SEC~: 6 COUN: NDRTH SLOPE STAT: ALASKA CTRY: USA PRES: NEDiTL~ ** RLCORL YPE 047 ~* TYPE CATE SIZE CODE 000 000 03O O65 000 000 004 065 000 000 012 065 000 000 003 065 000 000 003 065 000 000 001 065 000 000 012 065 OOO 000 006 065 0.00 000 004 065 UNIT TYPE CATE SIZE CODE 000 000 OO7 O65 LYP O0~.H05 VERIFICATIO:9 LISTING PAG~ 2 RECORD TY~E 047 ~* JOB # 10707,62366 COMPANY NAME WELL ~%ME FIELD COUI~Tf SECTIO:~ TOWNS~.[P SOHIO AbASKA ?ETR~]LEUh E'20 PRUDHOE 6A~ NORTH SLOPE 14g lin RANGE = 6 DIL RO:'{ #1 & 2, LOGGED X12'OEC'81 BOTTO~ LOG iNTERVAL = 10252 FT. TOP bO~; INTEHVAU CASING'LOGGER BIT SIZE TYPE M:]LE FLUID DENSITY VISCOS.(TY PH FLUID RM @ qEAS. TEMP. RMF ~ qEAS. TEMP. RMC 9 :,IEAS. TEMP. RM @ 9448 FT. 13.38 IN. ~ 2'101 FT. 8.5 IN. DURENEX 9.0 32.0 : g.o 4.5 ~b 2.070 ~ 6~ F 1.780 ~ 68 F 2.120 @ 6,9 F 0.940 9 158 F LYP 00~.~05 VERIFICATION LISTING PAGE DATA FORMAT ENTR~ ~LOCKS ~ECORD ** T~Pg SIZE REPR CODE .~ 1 66 ~ 4 73 ~ 4 65 O I 66 DATUM SPECIFICATION BbOCKS MNEM SEAVlCE SERVICE UNiI APl AP ID ORDER ~ LOG TYP DEPT FT 0 SFbU ,)IL OHMM 7 ILM :)lb OMMM 7 ILD ,)iL OHMM 7 SP ')IL ~ 7 GR '.)IL GAPI 7 3 DT ~%HC U$/F 60 5 GR ~HC GAPI 60 NPHI ?DN PO 42 6 RHOB ~DN G/C3 42 3 DRHO FDN G/C3 42 4 CALI ~'D~ IN 42 2 GR ?DN GAPI 42 NRAT ?DN 42 4 NCNb ~DN 42 3 FCN[~ ~ON 42 APl API FILE CLASS MOD NO. 0 0 0 0 0 0 0 0 0 46 0 0 0 0 0 32 0 0 32 0 0 32 0 0 2 0 0 I 0 0 0 0 0 3 0 0 32 0 0 t 0 0 92 0 0 93 0 0 ENTRY 1 60 .lIN 0 SIZE PROCESS SAMPLE LEVED 4 0 4 0 4 0 4 0 4 0 1 4 0 4 0 4 0 1 4 0 I 4 o 4 0 4 0 4 0 1 4 0 4 0 4 0 I REP COD 68 68 68 68 68 68 68 68 68 68 68 68 68 68 ~8 68 DEPT 10306.00u SFbd -99 SP -999.250 GR -99 NPHi 38.477 R~Od GR ~23.125 NRAf DEPT 10300.000 SFLU SP -22.594 GR NPHI 38.477 RHOB GR 123.125 NRAT DEPT 10200.000 SFLQ SP -29.531 GR NPHI i3.184 RHGB 9.250 iL~ 9.250 DT 2.113 DRHO 3.209 NCN& 295 IbM 6~6q~ DT 2.268 DRHO 3.209 NCN5 1.383 ILM 0.125 DT 2.881 DRMO -999.250 ILD -999.250 GR 0.118 CALI 2562.000 FCNb 3.504 86.750 GR 0.107 CALl 2562.000 FCNL 9.148 IbD 78.375 GR 0.187 CALI -999.,250 . 0 '999,'25~0 4.418 86 688 2:709 764.50O 10.i41 80.125 8.719 bVP OOg. HO5 VERIFICATION LISTING PAGE 4 GR 61.LBO NRA~ DEPT 10100.000 SFLO SP -76.063 GR NPHI 22.949 RHOS GR 94.438 NRA~ DEPI£ 10000.000 SFBU Sp -69.000 GR NPHi 22.26b RHOB GR 3b.18~ NHAT DEP~> 9900,000 SFLU Sp -70.375 GR NPHi 19.727 RhOB GR 26.641 NRAT DEPT 9800.000 SFbO Sp -67.875 GR NPHI 15.820 RHOB GR !8.76~ NRA~ DEPT 9700.000 SFLU SP -66.875 GR NPHI 17,773 RHOB GR 26.781 NRAT DEPT 9600.000 SFb~ SP -74,938 GR NPHI 13.81~ RHOS GH 21.~41 NRAT DEPT 9500.000 SFbU SP -15.859 GR NP~ii 20.1!7 RHO5 GR 96,125 NRAT DEPT 9400.000 SFLU SP -999.250 GR NPHI 47.217 GR 62,781 NRAT DEPT 9300,000 SFhU Sp -19.078 GR NPHi -999.250 RHOB GR -999.250 NRAT DEPT 9200.000 SFDU SP -14.602 GR NPHi -999.250 RHOB GR -999.250 NRAT DEP'£ 9100.00~ SFLU SP -1~.672 GR 43 2 2 17 2 2 23 23 2 2 7 2 2 42 23 2 2 5O 27 2 20 92 2 2 -999 62 2 4 2 50 -999 -999 1 110 -999 -999 2 8O ,9 .4 .5 .4 .5 .9 .3 .4 .7 .0 .4 .3 .2 .7 .4 .0 .4 .4 .4 .2 .0 .1 .! .9 .7 .2 .0 .4 .1 .1 .8 .4 .1 .2 .2 .8 .5 11 ~4 63 39 44 69 81 98 81 94 71 70 98 9~ 69 67 19 O0 41 27 81 03 25 75 50 14 -6O 78 13 5O 5O 80 88 5O 5O 14 O0 NCNb ILM DT NCNb DT DRHO NCNb DT DRH. O NCNb IbM DT DRMO NCNb DT DRHO NCNb DRHO NCNb IbM DT DRNO NCNb DT DT DRHO NCNb IbM DT DRHO NCMb IL~ DT 3~90.000 11.070 83,000 0.079 3084.000 16.984 89.563 0.022 3430.000 16.938 83.000 -0.012 3blO.O00 9.578 75.000 -0.016 4040.000 33.8q4 8!.375 0.00~ 3672.000 32.000 105.563 -0.0~5 3666.000 1~,398 7 .750 0.012 2928.000 -999.250 57.375 -0.531 1672.000 2.40B 76.375 -999.250 -999.250 1.245 57.594 -999.250 -999.250 2.766 56,781 FCHb GR CALl FCNb GR CghI FCNL IbD GR CALI FCNh IbP GM CALl FCNL GR CALI GR CAbi FCNb ILD GR CAI.,I FCNb lbo GR ILl) CALl FCNh ILD 1883,000 11.992 43.563 8.367 1142.000 18.906 32.969 8 430 1334:000 17.547 23,094 8.578 1567.000 14.773 18.719 8.805 1856.000 35 69 8,7003 606. 00 45 938 9 70 1775.000 11.555 92.625 9 38 1074:0900 -999.250 62.063 8.750 379.750 2.506 50.813 -999.250 -999,25O 1.178 55.438 -999.250 -999.250 2.701 41.406 LVP GR DEPT SP NPHI GR DEPT NPHi DEPT SP NPHI GR DEPT SP NPHI GR DEPY SP NPHI DEPT SP NPHI GR DEPT SP NPHI GR DEPT SP NPHI DEPT SP NPHi DEPT SP NPHi DEPT Oog. H05 VERIFICATION -999.250 RHDF~ -999.250 NRAT 9000,000 SFLU -10,844 GR -999.250 RHOB -999.250 NRAT 8900.000 SFLU -8.016 GE -999.250 RHUB -999.250 NEAT 9800.000 SFbU -14.289 GR -999.250 RHOB -999.250 NRA]? 8700.000 SFLO -15.320 GR -999.250 RHOS -999.25V NRAT 8600.000 SFbU '11,070 GR '999,250 RHOB '999.250 NRAT 8500.000 SFLU -12,b5b GR -999.250 RHG6 -999.250 NRAT 8400.000 SFbU -3.029 GR -999.250 RH06 -999.250 NRAT 8300.000 SFbU 5.379 GR -999.250 RHO~ -999,250 NRAT 8200,000 SFbU 2.145 GR -999.250 RHOB -999.250 NRAT BlO0,O00 SFLU 0.922 GR -999.250 RHOB -999.250 NRAT 8000,000 SFLU LISTING =g99 -999 1 103 =gg9 -999 i 107 -999 =999 3 88 -999 '999 2 94 -999 '999 3 174 =999 -999 5 198 =999 -999 4 160 -999 -999 130 -999 -999 7 79 -999 -999 10 81 -999 -999 .250 .250 ,497 .688 ,250 .250 ,749 ,563 .250 .250 .469 875 '250 . .250 .971 .188 .250 .250 .746 ,000 ,250 ,250 ,895 .625 ,250 .250 .082 .750 .250 .250 .828 .125 ,250 .250 ,500 .688 .250 ,250 .766 ,312 .250 .250 ,777 DRHO NCNb IbM DT DRMO NCNb IbM DT DRMO NCNb IbM DT DRRO NCNb DT DRHO NCNb IbM DT DRHO IbM DT DRHO NCNb IbM DT DRHO NCNb IbM DT DRMO NCNb Ib~ DT DRHO NCNb DT DRHO NCNb -999,250 -999,250 1.379 56,375 -999.250 -999.250 1,433 -999,250 -999,250 =999.250 i.800 -999.250 -999.250 -999.250 2,641 -999.250 -999.250 -999.250 3.635 '999,250 '999.250 '999.250 4,305 '999.250 '999,250 '999.250 3.801 -999,250 -999.250 -999.250 6.629 -999.250 -999,250 -999.250 7,176 -999,250 -999,250 -999.250 14.031 -999,250 -999.250 =999,250 4.539 FCNb GR CAbI FCNb GR CALl FCNL GR CALl FCNb IbD GR CALI FCNb IbD GR CALi FCNb ILO GR CAGI FCNL GR CALI FCNb ILL GR CALl FCNb GR CALl FCNL ILL GR CALl FCNb PAGE -9999,250 -99 , 250 67 2 -999.25O -999.250 ~.369 -999.250 -999.250 -999.250 1.714 -999.250 -99 250 2.5~7 -999,250 -999,250 -999,250 :424 -99 250 =999.250 -999.250 4 223 -999:250 3.754 .-999 250 -999,250 6 - 50 -999.250 -999.250 7.242 9 250 -999.250 - 50 -999.250 -999.250 4.477 LVP 009.H05 VERIFICATION LISTING PAGg 6 SP NPHI GR DEPT SP NPHI GR DEPT SP NPHI DEPT SP NPHI DEPY SP NPiii DEPT BP NPHI GR DEPT SP NPHI GR DEPT SP NPHi DEPT SP NPHI DEPT SP NPHi DEPT SP 3,664 GA -999.250 RHOS -999,250 NRAf 7900,000 8FLU 1,405 OR -999.250 -999,250 NRAT 7800.000 SFLO -13.914 GA -999,250 RHOB -999.250 NRAT 7700.000 SFLd -2i.~0~ G~ -999.250 RHG~ -999.250 NRA/' 7600 . 000 9 922 GR 7500.000 SFbU -32,688 GR -999.250 R~OB -999.250 NRAT 7400.000 -31.469 GR -999.250 RHOB -999.250 NAA1~ 7300,000 $F50 -20.188 GR -999,250 RHOi~ -999.250 NRAt 7200.000 SFLU -24,984 GR -999,250 RHOB -999,250 ~RAT 7100.000 SFbd -27.063 GR -999,250 RHO~ -999,250 NRAT 7000.000 SFLd -999,250 RHOD -999,250 NRAT 126.6 -999.2 -999.2 6.9 100.7 -999,2 -999.2 6.8 86.3 -999.2 -999.2 7.0 82.6 -999 2 -999:2 4.7 87.0 -999.2 -999.2 6.4 99.4 -999.2 -999.2 3.1 89.6 -999.2 -999.2 2.6 76.0 -999.2 -999.2 3.3 82.2 -999.2 -999.2 3.2 80.9 -999.2 '"999.2 3.2 79.0 -999.2 -999.2 25 50 5O 49 50 50 5O 91 12 5O 5O 39 5O 50 63 50 5O 49 38 50 50 8O 5O 5O O0 50 50 59 5O 5O 5O 7O 38 5O .50 ~7 00 50 5O DT DRHO DT DRBO NCNb IL~ DT DRHO NCNb DT DRHO NCNS DRMO NCNb IbM DT DRHO NCN& IbM DT DRHO I~ DT DRHO NCN5 DT DRHO Ib~ DT DRHO NCNb DT DRHO -999,250 -999,250 -999,250 6.883 -999.250 -999.250 -999.250 6,547 -999.250 -999.250 -999.250 7,184 -999,250 -999,250 -999.250 4.836 -999.250 -999,250 -999,250 6.469 -999,250 -999,250 -999.250 3,371 -999,250 -999,250 -999.250 3.178 -999.250 -999.250 -999.250 3,018 -999,250 -999,250 -999,250 3,029 -999.250 -999,250 -999,250 3.469 -999,250 -999,250 -999.250 G~ CAL~ FCN~ IbP GR CALl FCNL IbD GR CAb i FCNL GR CALI FCNL IbD CALI FC~b GR CALl FCNL ILD GR CALI FCNb GR CALl FCNL ILD GR CALl FCNL ILD GR CALl FCNL ILD GR CAbi -999,250 -999.250 -999,250 6.883 -999.250 -999.250 -999.250 6.695 -999 50 -999,250 7.2~7 -999,2 0 -999.250 -999,250 4.859 -99 250 -999.250 6 449 : 99 99~250 3.410 -999.250 -999.250 -999,250 3.018 -999.250 -999.250 -999.250 3,340 -999 250 -999~250 -999,250 3.158 -999,250 -999.250 -999.250 3,574 -999,250 -999.250 -999,250 DEPT ~PH~ GR DEPT SP NPHI DEPT SP NPHi DEPT SP NPHI DEPT SP NPHi GR DEPT SP NPHI DEPT SP NPHI DEPT SP NPHI DEPT SP NPHI DEPT SP NPHI GR DEPT SP NPHI GR 0900.000 ,F~U -60.500 GR '999.250 RHO~ -999,250 NRAT 6800,000 SFLU -98,375 GR -999,250 RH08 -999,250 NRAT 6700.000 ,FhU -5i,750 GR -999.250 RHOE -999,250 NRAT 6600,000 SFhU -56,000 GR -999.250 RHOB -999.250 NHAT 6500.000 SFLO -70.375 GR -999,250 RHOB -999.250 NRAT 6400.000 Sf'LU -53.219 GR -999.250 RHOB -999.250 NRAT ~300,000 'FLU -119.563 GR -999,250 RtiO~ -999.250 NRAT 6200,000 SFLU -86.250 GR -999.250 RHOB -999.250 NRAT 6100.000 SFLb -73.563 GR -999.250 RROB -999.250 NR~Y 6000.000 SFLU -80.375 GR -999.250 RHOB -999.250 NRA~ 5900.000 SFLU -64.750 GR -999.250 RH06 -999.250 NRAT LISTING , 59. -999, -999 , 51. -999, -999, . 79, '999. -999, , 69. -999, -999. . 70, -999, -999. 75. '999 '999 , 26, -999. -999. 53. -999 -999 2~ 51, -999 . -999. , 49. -999. -999' . 51. -999, -999, ~63 250 259 348 750 250 25O 857 438 25O 250 76O 3t2 25O 25O 164 5OO 25O 250 662 250 250 2.50 250 250 2.5,'0 576 219 250 250 207 312 250 250 283 063 250 25O 180 000 250 250 ILM DT DRHO NCNb IL~ DT DRHO NCNb DT DRHO NCNL DT DRHO IbM DT DRHO NCNb IL~ DT NCNb In~ DT DRHO NCNL IL~ DT DT DRHO NCNb IbM DT DRHO NC~L DT DRHO NCNb 2,891 -999.250 -999.250 -999.250 2.39~ -999.250 -999.250 -999.250 ~,250 -999.250 -999.250 -999.250 3,055 -999.250 -999,250 -999.250 1.965 -999,250 -99~.250 -999.250 2.631 -999.250 -999.250 -999.250 0,935 -999.250 -999,250 -999.250 1.583 -999,250 -999.250 -999.25O 1.781 -999.250 -999,25O -999.250 1.837 -999.250 -999,250 -999.250 1.499 -.999.250 -999.250 -999,250 CALl FCNL ILL GR CALl FCNb ihO GR CALl FCNL I LD GR CALI FCNL ILL GR CALl ' GR CALl FCNb ILD GR CASf FCNG G~ CALl FCNb ILL GR CALl FCNL ILL GR CALl FCNh GR CALf FCNL PAGE 2.840 -999,250 -999.250 -999.250 2,086 -999 50 -999.250 4,406 -999.250 -999 ~50 -999~ 50 3.312 -999 2250 -999: 50 -999.250 - 50 -999.250 -999,250 2.527 -999,250 -999.250 -999.250 805 -999.250 -999.250 1.414 99~*.250 -999,250 919,673 -9 .250 99 250 ! .603 99.250 99.250 1.398 99 250 -999.250 LVP 009.H05 VERIFICATION LISTING PAGE DEPT 5800.000 SFLU Sp -40.469 GR NPHI -999.250 RHOb GR -999.250 NRAT DEPT 5700.0{)0 SFLO Sp -66.375 GR NPHI -999.250 RHO~ GR -999.250 NRAT DEPT 5600.000 SFLb Sp -29.51~ GR NPHi -999.250 RHOb GR -999.250 NRAT DEPT 5500.000 SFbU SP -47.719 GR NPHI -999,250 RHOD GR -999,250 NRAT DEPT 5400.000 SFLU SP -72.125 GR NPHi -999.250 RHO~ GR -999.250 NRAT DEPT 5300,000 SFLb Sp -41.781 GR NPHI -999,250 RHOD GR -999.250 NRAT DEPT 5200.000 SFLU Sp -51.bO0 GR NPHI -999,250 RHOB GR -999.250 NRAI DEPT 5100,000 SFbb Sp -107.125 GR NPHI -999,250 RHOB GR -999.250 NRA~> DEPT 5000,000 SFLO Sp -50.78! GR NPHI -999.250 RHOD GR -999.250 NRAT DEPT 4900.000 SFLU Sp -55.531 gR NPHi -999,250 RHOB GR -999,250 NRAI DEPT 4800.000 SP -30.500 NPH~ -999.250 RH05 3,443 63.53~ -999.250 -999.250 2.~23 55.094 -999.250 -999.250 2.7~5 77.875 -999.250 -999.250 3,455 77.25U -999.250 -999.250 3.465 55.9m6 -999.250 -999.250 3.354 86.93~ -999.250 -999.250 3.45i 67.250 -999.250 -999.250 3.7!7 26.859 -999.~50 -999.250 2.469 66.186 -999.~50 -999.250 5.547 61.5h3 -999.250 -999.250 3,262 94,1~6 -99~.250 DT DI NCNb IbM DT DRHO Ib~ DT DRHO NCNb DT NCNb IDN DT DRHO NCNb DT DRHO NCNb DT DRHO NCNb IbM DT DRHO NCNb DT DRHO ,2.875 -999.250 -999.250 -999.250 ~,54~ -999.250 -999.250 -999.250 3.055 -999.250 -999.250 -999.250 3.406 -999.250 -999 50 2.357 -999,250 -999.250 -999,250 3.410 -999.250 -999.250 -999.250 3.088 -999.250 -999,250 -999.250 1.500 -999,250 -999.250 -999.250 2.232 -999,250 -999,250 3.721 -999,250 -999.250 -999.250 3.447 -999,250 -999.250 GR CALI FCNh GR CALI FCNb I bD GR CALI FCNL GR CALI FCNL ILO GR CALl FCNL GR CALi FCNb CALI FCNb I6D GR CALI FCNb ILD GR CALl FCNL GR CALI FCNL I6D GR CALI 2.721 -999.250 -999.250 -999.250 ! .506 -999.250 2.959 -999 ~50 -999:50 -999.250 3 66 -999 50 2.199 -999.250 -999,250 -999.250 25O -999,250 -999.250 2,998 -999.250 -999.250 -999.250 1,340 -999,250 2.230 -999.250 -999,250 -999.250 -999 50 -999 250 -999,250 3,766 -999,250 -999.250 GR DEPT SP NPH1 GR DEPT SP NPHI DEPT SP NPHI DEPT SP NPHI GR DEPT SP NPHI GR DEPT SP NPHI GR DEPT SP NPHi GR DEPT SP NPHI GR DEPT SP NPHI GR DEPT SP NPHI GR DEPT SP Ou~.H05 VERIFICATIOt: -999.250 NRAT 4700,000 SFLU -32.781 GR -999,250 RHO5 -999.250 NRAT 4600,000 SFLU -59,781 GR -999.250 RHO~ -999.250 NRAT 4500.000 SFbb -33.250 GR -999.250 RHOE -999.250 NRAT 4400,000 SFLD -76.938 GR -999,250 RHOB -999'250 NRAT 4300.000 SFbU -32.781 GR -999.250 RHOB -999,250 NRAT 4200.000 SFLU -43.000 G~ -999,250 RHOB -999.250 NRA~ 4100.000 SFLU -75.563 GR -999.250 RHOB -999.250 NRAT 4000.000 SFDU -81.375 GR -999.250 RHOB -999.250 NRAI 3900.000 SFbU -75.813 GA -999.250 RHO~ -999.250 NRAT 3800,000 SFLU -45.750 GR -999.250 RHOB -999,250 NRA%' 3700.000 SFhU -86,000 GR '999 86 -999 -999 4 56 -999 -999 4 79 -999 -999 4 39 -999 -999 4 86 -999 -999 4 70 -999 -999 4 63 -999 -999 4 51 -999 -999 47 -999 -999 4 72 -999 -999 4 51 .256 .62r-- .250 ,250 .109 .7!9 .250 .250 .445 .332 .250 .250 .152 .094 .250 .250 .277 .68~ .250 .250 .387 .125 .250 .250 .703 .000 .250 .250 .152 .938 .250 .250 .07~ .094 .250 .250 .648 .i25 .250 .250 .723 .344 DT DRHO NCNb DT DRHO NCNb DRH~ NCNB IL~ DT DRHO DT DRHO NCNB ~T DRHO DT DRHO NCNb IL~ DT DRHO IL~ DRHO DI DRHO NCNb IbM DT -999.250 4.391 -999.250 -999.250 -999.250 3.688 -999.250 -999.250 -999.25O 6.402 -999.250 -999,250 -999.250 2.484 -999.250 -999.250 -999.250 4.137 -999.250 -999.250 -999,250 6.234 -999.250 -999.250 -999.250 2.95! -999.250 -999.250 -999.250 2.455 -999,250 -999,250 -999.250 2,691 '999,250 -999,250 -999.250 4,156 -999,250 -999,250 -999,250 2.484 -999.250 GR FCN5 CA~i FCN~ I bD GR CAI,i FCNL ILD GR CALI GR CALl FCNL CALl FC~L GR CAI!I IbD GR CALl FCN6 GR CALl FCNb I hD GR CALI FCNb ILD GR PAGE -999,250 4,480 -999 250 -999!250 -999 250 3.439 -999,~50 -999, 50 -999.250 4.633 -999.250 -999.250 -999.250 2.186 -999 250 -999i250 -999 250 4,566 -999,250 -99 250 219 250 -999,250 2,551 -999,250 -999,250 -999.250 2. I'95 .250 -999,250 2 512 -999~250 50 4 266 99'250 -999.250 2,225 -999.250 LVP 0£.9.H05 VERIFICATION LISTING PAGE 10 DEPT SP NPHI DEPT ,P NPHI DEPT SP NPHI GR DEPT ,P NPHi GR DEPT $P NPHI DEPT ,P NPHI DEPT ,P NPHI DEPT SP NPHI GR DEPT BP NPHI GR DEPT SP NPHI GR DEPT -999.25U RHOf: -999.250 NRA~ 3600.000 SFLU -47.969 GR -999,250 RHOB -999,250 NRA~~ 3500.000 SFbU -25.500 GR -999.250 RHOE -999.250 NRAT 3400.000 ,Fbb -45.781 GR -999.250 RHOB -999.250 NRA~ 3300.000 BP'Lb -86.250 GR -999.250 R[tOS -999.250 NRAI~ 3200.000 SFLU -66.500 GR -999.250 RHOB -999.250 NRA? 3100.000 -31'750 GR -999.250 -999.250 NRAT 3000.000 ,FLU -49.750 GR -999.250 RHOB -999.250 NRAT .2900,000 $FLU -57.563 GR -999.250 RHOb -999.250 NRAT 2800.000 SFbU -35.312 GR -999.250 RMOB -999.250 NRAT 2700.000 SFbU -36.781 GR -999.250 R~OD -999.250 NRAT 2~83.500 SFLO -999. -999. . -99 . -999. , 89. -999. -999. . 72. -999. -999. e 45. -999. -999. · -999, · 81. -999. -999. · 71. -999. -999. · 54. -999. -999. . 80. -999. -999. · 32. -999. -999. · 250 25o 445 375 250 250 371 438 250 250 176 3~.2 250 250 312 250 250 3~] 394 250 250 172 813 250 250 113 688 250 250 287 250 250 03i 625 250 25O ~32 813 250 25O 96i DRHO NCNL DT DRHO NCNb DT DRH~ NCNb DR~O DT DRHO NCNL DT DR~O NCNb DT DRHO NCNb DT DRHO NCNb IbM DT DR~O NCNb DT DRMO NCNb IbM DT ORNO NCNb -999.250 -999.250 2.859 -999.250 -999.250 -999.250 2.225 -999.250 -999.250 -999.250 2.586 -999.250 -999.250 -999.250 1.214 -999.250 -999.250 -999.250 2,043 -999,250 '999,250 '999.250 2.176 -999.250 -999.250 -999.250 1.909 -999.250 -999.250 -999.250 2.529 -999.250 9.250 2.064 -999.250 -999.250 -999.250 2000.000 -999.250 -999.250 -999.250 40.688 CALl FCNb ILO GR CALI IbD GR CALI FCNb IbP GR CALI FCNL GR CALl FC~b GR CALI FCNb GR CALl FCNb IbD GR CALI FCNL GR CALf FCNL ILD GR CALI FCNb G~ CALl FCNL I LD -999 250 -999;250 2.818 -999 ~50 -999~ 50 -999.250 2 90 - 50 2 506 99 250 999 250 1,141 99,250 999.250 I 872 '999i250 -999 250 -999 250 2 -999,250 -999.250 1.834 -999.250 -999,250 -999.250 2.332 -999.250 '999,~50 -999. 50 2.320 -999.250 -999.250 -999.250 2O00.0O0 -999.250 2000.000 LVP O(;g. H05 vERIFICATION LISTING SP NPHI GR 33.71~ G~ -999.250 RHO~ -999.250 NRAY 27.266 D~ -999.250 DRUO -999.250 ~CNL *~ FILE T~AIDER FIDE NA~,E :SERVIC.OO1 SERVICE NAME VERSION # : DAT~ : MAXIMU~ LENGTH : 1024 FILE TYPE NEXT FILE NAME : '999.250 GR -999.250 CALf -999. 250 FCNL PAGE '99 250 -999.250 ** TAPE THAIbER ** SERVICE NA~E :$ERVIC DATE :81/12/21 ORIGIN :1070 TAPE NAME :62366 CONTInUATiON # :01 NEXT TAPE NAME : COM~EP:T$ :TAPE COMMENTS ** REEL TRAILER ** SERVICE NAME :SERVIC DATE :91/12/21 REED LAME fREED ID CONTi[~UATI[]N ~ NEXT REEL NAME : COMME~T$ :REEL COMMENTS ***~*~**** EOF ~as~a Dil & WESTERN ATLAS Atlas Wireline Services Tape Subfile 2 is type: LIS - TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD E - 20 (24-05-11-14) 500292057600 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 24-SEP-94 1470.01 K. RICHARDS J. BENNETT 6 11N 14E 1743 883 60.50 59.50 30.40 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 9458.0 47.00 7.000 10262.0 26.00 5.500 8909.0 17.00 4.500 9051.0 12.60 BASELINE DEPTH 9370.0 9458.0 9464.5 9472.0 9474.0 9476.5 9488.5 9492.5 9495.0 9497.5 9501.0 9501.5 9504.0 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH 9370.0 9458.5 9464.5 9473.5 9475.0 9478.0 9490.0 9494.0 9495.5 9499.0 9503.0 9503.5 9505.5 BHCS GR 2 1 27-NOV-81 SCHLUMBERGER WELL SERVICES 9506.5 9507.0 9519.5 9520.5 9523.5 9528.0 9537.0 9538.0 9551.0 9551.5 9552.5 9553.5 9555.0 9561.5 9571.0 9574.0 9579.0 9586.0 9589.0 9600.5 9624.0 9626.0 9632.0 9633.0 9636.0 9639.0 9640.5 9641.5 9642.0 9645.5 9650.0 9658.0 9662.5 9678.5 9681.0 9683.0 9692.5 9696.0 9697.5 9701.0 9708.0 9713.0 9717.0 9721.0 9738.0 9746.5 9748.5 9754.0 9763.5 9764.5 9766.5 9767.0 9771.0 9774.0 9788.0 9791.0 9802.0 9810.0 9815.0 9816.0 9508.0 9509.0 9521.5 9522.0 9525.0 9529.0 9538.0 9538.5 9551.5 9552.5 9553.5 9554.0 9555.5 9562.5 9572.0 9574.0 9579.0 9584.5 9589.0 9601.0 9624.5 9626.5 9632.5 9634.0 9637.0 9640.0 9641.5 9642.0 9642.5 9646.5 9650.5 9659.0 9663.5 9679.0 9681.5 9683.5 9693.5 9697.0 9698.0 9701.0 9708.0 9713.0 9717.0 9721.0 9739.0 9746.5 9748.5 9754.5 9764.0 9764.5 9766.5 9767.5 9771.5 9774.5 9788.5 9792.0 9798.5 9808.5 9813.5 9815.5 9820.5 9831.0 9845.0 9851.0 9857.0 9862.5 9864.5 9873.0 9874.5 9884.0 9888.0 9891.5 9892.0 9895.0 9895.5 9896.0 9897.5 9900.0 9901.0 9902.0 9904.0 9905.0 9906.5 9909.0 9913.0 9919.0 9920.5 9924.0 9926.0 9932.0 9936.0 9939.0 9941.5 9947.5 9949.0 9953.5 9954.5 9957.0 9958.0 9959.0 9960.5 9961.5 9968.5 9973.0 9976.0 9980.0 9984.0 9987.0 9992.0 9995.0 9998.0 10006.0 10007.5 10009.5 10013.5 10017.0 10019.5 10022.5 10026.0 10033.0 9818.5 9832.0 9845.0 9852.0 9857.5 9861.5 9863.5 9872.0 9873.0 9883.5 9888.0 9891.0 9892.0 9895.0 9896.0 9897.0 9897.5 9900.5 9901.0 9901.5 9903.5 9905.0 9906.5 9909.0 9912.0 9919.0 9920.5 9922.5 9925.0 9932.0 9936.0 9939.0 9941.5 9948.0 9949.0 9953.5 9954.0 9956.5 9958.0 9959.0 9960.5 9961.0 9968.0 9973.0 9977.0 9981.5 9984.0 9986.5 9991.5 9994.0 9996.5 10006.0 10007.5 10009.5 10013.0 10016.0 10019.5 10022.0 10025.5 10031.0 10036.0 10041.0 10046.0 10051.0 10061.0 10064.0 10068.0 10069.5 10074.0 10078.5 10086.0 10087.0 10089.5 10091.0 10093.0 10095.0 10097.0 10098.0 10098.5 10099.0 10103.5 10109.0 10121.0 10165.0 $ REMARKS: 10034.0 10039.0 10046.0 10050.5 10061.0 10064.5 10068.0 10069.5 10074.5 10078.5 10084.5 10086.0 10088.0 10091.5 10093.0 10095.0 10098.5 10099.5 10100.0 10100.5 10104.5 10107.5 10120.5 10165.0 CN/GR CASED HOLE. LOG TIED TO GAMMA RAY LOG DATED 30-AUG-82. ORIGINAL OPEN HOLE CNL LOG RAN IN LIMESTONE MATRIX. MAX DEV. ANGLE 42 DEGREES AT 10,000 FEET. LOG RAN AFTER PUMPING 150 BBLS OF SEAWATER. CN LOGGING PARAMETERS: LIMESTONE MATRIX CHISM OFF CALIPER CORRECTION = NONE CASING CORRECTIONS OFF SALINITY = 0 PPM. PRODUCTION TEST (27-AUG-94): GROSS FLUID RATE = NET OIL RATE = FORMATION GAS = WATER CUT = CHOKE = 2.01 MBPD 2.00 MBOPD 24.06 MMSCFD 0.2 PCT 55.8 SHIFT PROCEDURE IS AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. /??MATCHiA.OUT FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: i DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9380.0 10128.0 9393.0 10136.0 BASELINE DEPTH 9370.0 9456.0 9457.5 9503.5 9506.5 9508.5 9511.5 9514.5 9517.5 9548.0 9548.5 9549.5 9553.5 9554.0 9588.5 9623.5 9636.0 9650.0 9667.0 9679.0 9681.5 9683.0 9696.0 9699.0 9707.5 9717.0 9721.0 9732.5 9737.5 9774.0 9814.5 9816.0 9847.0 9856.5 9886.5 9888.0 9889.0 9890.0 9893.5 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH NPHI 9370.0 9453.0 9454.0 9499.0 9502.0 9504.5 9508.5 9510.0 9518.0 9545.5 9547.5 9548.5 9555.0 9555.5 9588.5 9622.0 9636.0 9650.0 9669.0 9680.0 9682.5 9684.0 9698.5 9701.0 9706.0 9716.0 9720.0 9732.0 9737.5 9772.0 9813.0 9815.0 9844.5 9856.5 9887.5 9889.0 9889.5 9890.5 9893.5 9896.0 9897.0 9899.0 9899.5 9900.5 9901.5 9936.5 9937.5 9951.0 9951.5 9953.0 9954.0 9954.5 9959.0 9973.0 9984.0 9987.0 9989.5 9998.5 10008.5 10010,5 10022.5 10036.5 10046.0 10064.0 10067.5 10070.5 10073.5 10077.0 10086.5 10100.5 10106.5 10112.0 10144.0 10144.5 10145.5 10146.5 10165.0 $ REMARKS: 9896.0 9896.5 9898.5 9899.5 9900.5 9901.0 9936.0 9936.5 9948.0 9948.5 9949.0 9949.5 9950.0 9957.5 9970.0 9981.0 9982.5 9985.5 9992.0 10007.0 10008.5 10017.5 10030.0 10042.5 10059.5 10064.5 10066.5 10068.5 10071.0 10080.5 10101.0 10106.5 10112.0 10141.0 10141.5 10142.0 10142.5 10165.0 PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B . OUT $ : BP EXPLORATION : E- 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 2O * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 Tape File Start Depth = 10165.000000 Tape File End Depth = 9370.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9547 datums Tape Subfile: 2 388 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9381.0 10128.0 9393.0 10136.0 BASELINE DEPTH GRCH 9370.0 9370.0 9383.5 9382.5 9387.0 9385.5 9388.5 9394.0 9393.0 9395.5 9395.5 9398.0 9399.5 9400.0 9402.5 9401.5 9405.0 9404.5 9410.0 9410.5 9412.5 9412.5 9416.0 9420.5 9424.0 9425.5 9427.5 9434.0 9440.0 9442.5 9444.0 9446.5 9448.5 9454.5 9461.5 9463.5 9416.0 9420.0 9424.5 9426.5 9428.0 9436.0 9440.5 9443.0 9445.0 9447.0 9448.5 9451.5 9458.0 9460.5 9462-5 9463.5 9464.5 9467.5 9468.5 9469.0 9471.0 9471.5 9472.0 9477.0 9479.5 9467.5 9471.5 9477.0 9481.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH - NPHI 9370.0 9387.5 9397.0 9459.5 9460.5 9461.0 9464.0 9464.5 9465.5 9466.0 9483.5 9485.5 9488.0 9490.0 9490.5 9491.0 9491.5 9492.5 9494.5 9498.0 9499.5 9504.0 9506.5 9513.0 9515.0 9515.5 9516.5 9520.5 9526.0 9528.5 9529.5 9534.5 9536.0 9538.0 9540.5 9542.0 9543.0 9544.5 9545.5 9548.5 9549.5 9551.0 9553.5 9561.5 9567.0 9569.0 9578.5 9582.0 9589.0 9591.5 9592.0 9593.0 9594.0 9600.0 9603.0 9609.0 9611.5 9617.5 9618.5 9619.5 9620.5 9621.0 9621.5 9624.0 9627.0 9627.5 9631.0 9631.5 9632.0 9633.0 9488.5 9490.5 9492.0 9494.5 9498.5 9501.0 9507.5 9516.5 9517.0 9529.0 9529.5 9548.5 9549.0 9553.0 9561.5 9567.5 9569.5 9578.0 9581.0 9588.5 9592.0 9593.0 9593.5 9600.0 9603'0 9610.5 9623.5 9627.0 9632.0 9633.0 9480.0 9482.0 9485.5 9486.0 9486.5 9487.0 9498.5 9509.5 9511.5 9519.5 9525.0 9532.0 9534.5 9536.5 9538.5 9540.0 9540.5 9542.0 9542.5 9548.0 9591.0 9599.5 9607.0 9615.5 9616.0 9616.5 9617.5 9619.0 9619.5 9626.0 9629.5 9630.5 9631.5 9636. 9638. 9639. 9640. 9640. 9643. 9644. 9650. 9653. 9659. 9667. 9677. 9680. 9682. 9683. 9687. 9687. 9690. 9693. 9695. 9698. 9707. 9708. 9717. 9720. 9721. 9722' 9726. 9728. 9737. 9738. 9739. 9743. 9747. 9749. 9755. 9756. 9757. 9758. 9758. 9763. 9769. 9769. 9770. 9771. 9773. 9773. 9777. 9781. 9783. 9784. 9798. 9803. 9816. 9828. 9832. 9834. 9836. 9849. 9851 · 9636.5 9638.5 9640.0 9641.0 9643.5 9644.0 9650.0 9653.0 9659.0 9669.0 9678.5 9682.5 9692.5 9698.5 9707.0 9717.0 9721.0 9721.5 9728.5 9738.0 9740.0 9747.0 9754.5 9755.0 9757.0 9758.0 9763.0 9768.5 9769.5 9770.0 9770.5 9772.5 9773.5 9777.5 9802.5 9815.0 9832.0 9850.0 9852.0 9639.0 9680.5 9683.5 9687.5 9688.0 9692.0 9697.0 9706.5 9716.0 9718.5 9725.0 9738.0 9742.5 9746.0 9748.5 9757.5 9772.0 9781.0 9782.5 9783.0 9801.5 9815.0 9828.0 9831'.5 9833.5 9856. 9856. 9864. 9867. 9868. 9874. 9876. 9877. 9877. 9880. 9885. 9885. 9886. 9887. 9887. 9888. 9890. 9890. 9891. 9894. 9894. 9895. 9896. 9898. 9899. 9901. 9903. 9904. 9915. 9920. 9925. 9936. 9937. 9939. 9940. 9940. 9942. 9947. 9950. 9951. 9952. 9953. 9955. 9959. 9961. 9962. 9963. 9964. 9966. 9970. 9972. 9979. 9980. 9981. 9982. 9984. 9986. 9987. 9990. 9990. 0 5 0 5 0 0 0 0 5 5 0 5 5 0 5 5 0 5 0 0 5 5 5 5 5 5 0 5 0 0 5 O' 0 5 0 5 0 5 5 0 0 0 5 5 0 5 0 0 5 0 5 0 5 0 0 0 5 0 0 5 9856.5 9872.5 9880.5 9886.5 9887.0 9890.0 9891.0 9894.0 9898.5 9899.0 9901.0 9905.0 9915.0 9918.5 9925.0 9936.0 9940.0 9947.5 9952.0 9952.5 9955.0 9958.5 9962.0 9962.5 9966.0 9969.5 9972.5 9980.5 9981.0 9981.5 9984.0 9986.0 9990.0 9853.5 9863.5 9867.0 9868.0 9876.0 9876.5 9877.0 9885.5 9886.0 9886.5 9887.0 9887.5 9889.0 9894.0 9895.0 9895.5 9902.0 9935.5 9938.0 9938.5 9939.0 9947.5 9948.5 9950.0 9951.0 9959.5 9961.0 9962.0 9976.5 9983.0 9985.5 9991.5 9994.0 9997.5 9998.0 10003.5 10008.5 10011.0 10012,5 10017.0 10022.5 10026.5 10027.5 10028.0 10028.5 10030.5 10031.5 10033.0 10035.0 10036.5 10038.0 10039.0 10041.0 10043.0 10046.0 10046.5 10049.5 10050.5 10053.5 10056.5 10057.0 10057.5 10060.5 10062.5 10064.5 10065.5 10067.0 10068.5 10070.0 10071.5 10073.5 10074.0 10078.5 10082.0 10086.5 10087.5 10089.0 10094.0 10095.5 10096.0 10097.0 10099.5 10103.5 10105.5 10107.5 10110.0 10111.5 10112.0 10114.5 10117.5 10123.0 9990.5 9993.0 9997.0 10003.0 10008.5 10012.0 10016.5 10022.0 10026.0 10026.5 10029.5 10030.0 10033.5 10041.0 10046.5 10050.5 10052.5 10055.5 10056.5 10060.0 10066.0 10069.0 10071.5 10074.5 10079.0 10082.5 10086.0 10089.0 10097.0 10097.5 10098.0 10104.5 10107.0 10109.0 10111.0 10113.0 10116.5 10123.0 9992.5 10008.0 10010.0 10022.0 10022.5 10023.5 10024.0 10027.0 10029.0 10032.0 10033.5 10037.5 10043.5 10046.5 10051.5 10055.0 10058.5 10060.5 10067.5 10071.0 10074.5 10083.5 10090.5 10095.0 10099.5 10106.5 10112.0 10128.5 10129.5 10130.0 10130.5 10137.0 1O139.5 1O142.0 10142.5 10165.0 REMARKS: 10165.0 10125.5 10126.5 10127.5 10128.5 10135.5 10139.5 10140.0 10140.5 10165.0 PASS 2. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH2A. OUT / ? ?MATCH2 B . OUT $ : BP EXPLORATION : E- 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-L 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 Tape File Start Depth = 10165.000000 Tape File End Depth = 9370.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9547 datums Tape Subfile: 3 Minimum record length: Maximum record length: 358 records... 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 9384.0 10128.0 2418 9396.0 10136.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH 9370,0 9386.5 9388.5 9389.5 9394.0 9395.5 9397.5 9398.0 9399.5 9405.0 9407.5 9415.0 9420.0 9428.0 9430.0 9431.5 9435.5 9440.0 9447.0 9448.5 9452.0 9454.0 9455.0 9457.5 9460.0 9462.0 9466.0 9469.0 9472.0 9485.0 9491.5 9492.0 9493.0 9493.5 9494.5 9497.5 9504.5 ......... EQUIVALENT UNSHIFTED DEPTH ......... GRCH NPHI 9370.0 9370.0 9388.0 9390.5 9390.0 9393.0 9395.5 9397.5 9400.0 9399.5 9405.0 9407.5 9415.0 9420.5 9427.0 9430.0 9431.5 9435.5 9440.0 9446.5 9448.0 9454.0 9451.0 9452.0 9454.0 9459.5 9458.5 9465.5 9469.0 9472.0 9482.0 9492.5 9489.0 9489.5 9490.0 9495.0 9499.0 9500.0 9505.0 9505.5 9506.0 9508.0 9509.0 9509.5 9514.5 9517.0 9521.5 9525.5 9532.0 9532.5 9533.0 9534.5 9536.0 9538.0 9538.5 9540.0 9542.5 9543.5 9545.5 9547.0 9548.0 9549.0 9549.5 9550.5 9551.5 9552.0 9561.5 9570.5 9572.5 9579.0 9594.5 9596.0 9600.5 9607.0 9619.5 9624.0 9629.0 9629.5 9632.0 9633.0 9636.0 9638.5 9639.0 9641.0 9650.0 9653.0 9663.5 9670.5 9674.5 9675.5 9679.5 9683.0 9690.0 9693.0 9698.0 9701.5 9708.0 9714.5 9507.0 9517.5 9532.5 9533.0 9538.5 9545.0 9549.0 9551.0 9552.0 9562.0 9578.0 9594.0 9624.0 9630.0 9632.0 9633.0 9636.5 9639.5 9641.5 9650.0 9653.0 9683.0 9693.0 9701.5 9708.0 9500.5 9501.0 9503.0 9503.5 9504.0 9510.5 9515.5 9520.0 9522.5 9529.0 9532.5 9534.0 9536.0 9538.0 9540.5 9541.0 9544.5 9545.0 9545.5 9546.0 9547.0 9568.0 9570.0 9595.0 9599.5 9605.0 9617.5 9627.5 9628.0 9635.5 9638.5 9664.5 9670.5 9674.5 9675.0 9679.0 9691.5 9699.5 9713.0 9717.0 9720.5 9726.5 9728.5 9735.0 9737.5 9743.5 9748.5 9749.5 9756.0 9759.0 9761.5 9763.0 9764.0 9764.5 9767.0 9772.5 9774.0 9778.5 9779.5 9781.5 9783.5 9802.0 9814.5 9816.0 9816.5 9817.5 9825.5 9829.0 9833.0 9836.0 9838.0 9840.5 9843.0 9847.0 9849.0 9850.5 9851.5 9852.5 9853.0 9856.5 9866.5 9867.5 9877.0 9877.5 9882.0 9884.0 9885.5 9886.5 9887.5 9888.0 9888.5 9889.0 9890.5 9891.0 9891.5 9894.5 9895.5 9897.0 9902.5 9716.5 9737.5 9749.5 9759.5 9761.5 9763.5 9767.0 9772.5 9774.0 9778.5 9779.0 9801.5 9815.5 9847.0 9856.0 9869.5 9884.0 9888.0 9888.5 9890.0 9891.0 9894.5 9895.0 9716.0 9718.5 9725.5 9728.5 9734.5 9738.0 9743.0 9749.0 9756.0 9765.0 9765.5 9781.0 9783.0 9813.0 9815.0 9817.0 9823.5 9827.0 9831.5 9834.5 9837.0 9841.5 9844.0 9850.0 9851.5 9852.0 9853.0 9854.0 9865.0 9876.0 9876.5 9882.0 9886.0 9886.5 9887.0 9887.5 9891.0 9896.0 9901.5 9908.0 9910.0 9911.0 9914.5 9920.5 9922.0 9924.0 9925°5 9937.0 9937.5 9939.5 9940.5 9941.5 9943.5 9945.0 9947.0 9949.5 9950.0 9951.5 9952.5 9953.0 9954.0 9957.0 9958.5 9961.0 9963.5 9967.0 9968.0 9969.0 9972.5 9980.5 9981.0 9983.0 9984.0 9987.0 9989.0 9991.0 9992.0 9992.5 9998.5 10000.5 10005.0 10008.5 10012.5 10013.5 10014.0 10016.5 10022.5 10025.0 10026.5 10029.0 10029.5 10030.5 10031.5 10032.5 10033.5 10034.5 10035.0 10036.0 10037.5 9910.5 9920.5 9925.0 9936.5 9937.5 9940.5 9952.5 9958.5 9963.5 9966.5 9968.5 9972.5 9980.5 9983.0 9983.5 9990.5 9991.0 9991.5 9998.0 9999.5 10004.5 10008.5 10012.0 10016.0 10022.0 10026.0 10028.0 10028.5 10029.0 10030.0 10030.5 10031.5 10032.0 10033.0 9905.5 9907.5 9912.0 9919.5 9923.5 9935.5 9938.0 9938.5 9939.0 9941.5 9943.5 9945.5 9947.0 9948.0 9949.5 9950.0 9950.5 9951.0 9955.0 9957.0 9959.0 9961.5 9964.0 9964.5 9977.5 9982.5 9984.0 10007.5 10011.5 10012.0 10020.5 10028.5 10030.0 10038.5 10039.5 10041.0 10042.5 10046.0 10048.0 10054.5 10057.5 10060.5 10064.5 10067.0 10067.5 10070.0 10073.5 10074.0 10076.5 10078.0 10079.5 10086.5 10087.0 10088.0 10090.5 10095.5 10096.5 10097.5 10102.5 10104.5 10106.0 10106.5 10109.0 10112.0 10114.0 10119.0 10121.0 10123.0 10125.5 10132.0 10132.5 10133.0 10138.0 10142.0 10142.5 10165.0 $ REMARKS: 10032.0 10033.0 10041.0 10037.5 10046.0 10045.0 10054.0 10051.5 10057.5 10060.0 10059.0 10068.5 10067.5 10071.0 10074.5 10075.0 10077.0 10079.0 10079.5 10088.0 10088.0 10089.5 10091.0 10097.0 10098.0 10098.5 10103.5 10105.5 10107.5 10107.0 10108.0 10111.0 10112.5 10118.5 10121.0 10123.0 10124.0 10132.0 10132.5 10131.0 10136.0 10140.0 10140.5 10165.0 10165.0 PASS 3. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ??MATCH3A. OUT /??MATCH3B. OUT $ : BP EXPLORATION : E- 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2418 68 I GAPI 2 NPHI 2418 68 1 PU-L 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 mmmmmmm 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 Tape File Start Depth = 10165.000000 Tape File End Depth = 9370.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decOding summary: Rep Code: 68 19094 datums Tape Subfile: 4 332 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass i gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: .5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION : E- 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH CNAV 68 i GAPI 2 NPHI CNAV 68 i PU-L 3 FUCT CNAV 68 I CPS 4 NUCT CNAV 68 i CPS 4 4 35 725 65 1 4 4 35 725 65 1 4 4 35 725 65 1 4 4 35 725 65 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 32 Tape File Start Depth = 10165.000000 Tape File'End Depth = 9370.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17503 datums Tape Subfile: 5 55 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9380.0 2418 9389.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM GR CN CCL $ PULSE CODE MODULATOR GAMMA RAY COMPENSATED NEUTRON CASING COLLAR LOC. BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): STOP DEPTH 10141.0 10150.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE .00 .000 11-SEP-94 FSYS REV. J001 VER. 1.1 1527 ll-SEP-94 10219.0 10141.0 9400.0 10140.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA .000 10262.0 .0 PROD.FLUIDS+SEAWATER .00 .0 .0 0 .0 .000 .000 .000 .0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 2 FAR COUNT RATE HIGH SCALE (CPS): 402 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION : E- 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 _______ 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 126 Tape File Start Depth = 10157.000000 Tape File End Depth = 9373.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 50465 datums Tape Subfile: 6 Minimum record length: Maximum record length: 201 records... 62 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9381.0 2418 9389.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10146.0 10154.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSECODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER cuTs (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL LIMESTONE .00 .000 ll-SEP-94 FSYS REV. J001 VER. 1.1 1629 ll-SEP-94 10219.0 10141.0 9400.0 10140.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA .000 10262.0 .0 PROD.FLUIDS+SEAWATER .00 .0 .0 0 .0 .000 .000 .000 .0 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 2 FAR COUNT RATE HIGH SCALE (CPS): 402 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION : E - 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64 ) .0 .0 ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API AP1 API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-L 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 m m emmmmm -- m ~mm -- 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 126 Tape File Start Depth = 10162.000000 Tape File End Depth = 9378.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 48874 datums Tape Subfile: 7 Minimum record length: Maximum record length: 201 records... 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9377.0 2418 9392.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10145.0 10154.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): ll-SEP-94 FSYS REV. J001 VER. 1.1 1712 ll-SEP-94 10219.0 10141.0 9400.0 10140.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA .000 10262.0 .0 PROD.FLUIDS+SEAWATER .00 .0 .0 0 .0 .000 .000 .000 -~ .0 THERMAL LIMESTONE .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 2 FAR COUNT RATE HIGH SCALE (CPS): 402 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION : E - 20 (24-05-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TypE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code'Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 cNc 2418 68 1 PU-L 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL' 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 126 Tape File Start Depth = 10161.000000 Tape File End Depth = 9377.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep COde: 68 81836 datums Tape Subfile: 8 Minimum record length: Maximum record length: 201 records... 62 bytes 1006 bytes Tape Subfile 9 is type: LIS 94/ 9/22 O1 **** REEL TRAILER **** 94/ 9/23 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 23 SEP 94 1:54p Elapsed execution time = 20.82 seconds. SYSTEM RETURN CODE = 0