Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout180-107 Ima ect Well History File CoVer e XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the odginal file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Organizing RESCAN [] Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA OVERSIZED (Scannable) [] Diskettes, No. [] Maps: [] Other, No/Type ~[~ Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds BY: BEVERLY ROBIN VINCENT~ARIA WINDY Project Proofing (,"~BEVE~:~OBIN VINCENT SHERYL MARIA WINDY BY: Scanning Preparation ~ x 30 = (~ [] Other BY: COBIN VINCENT SHERYL MARIA WINDY Production Scanning Stage 1 BY; Stage 2 BY: PAGE COUNT FROM SCANNED FILE: '~9 ~ · PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: NO IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO E~EVER~INCENT SHERYL MARIA WINDY (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAY$CALE OR COLOR IMAGES) ReScanned (individual page [special atte~fi~t~] sca;~ning completed) RESCANNEDBY~ BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: /S/ General Notes or Comments about this file: Quality Checked (do.e) 12110/02Rev3NOTScanned,wpd ARCO ALASKA INC. Cook Inlet/New Ventures Engineering TRANSM1TFAL #343 TO: John Boyle COMPANY: AOGCC DATE: Au$. 22, 1~J89 FROM: Tom Wellman COMPANY: ARCO Alaska, Inc WELL NAME: Listed Below I I Transmitted herewith are the following Blue Sepia Sepia Line Folded Rolled M~,lar Tape Gamma Ray SCU 4179A 1 PLS scU 41~9A 1 Vertilo$ SCU 14-3 i Vertilo$ SCU 31-8 1 Receipt Acknowledgement: Return reciept t~ ARCO ALASKA' Inc. A'IWN: Judy Boegler ATO 1390A Post Office Box 100360 Anchorage, AK 99510-0360' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COM MISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend w Alter casing w Repair well Change approved program __ Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Stimulate Pull tubing __ Variance __ Perforate __ Other ~_bloel~racK I5. Type of Well: Development Exploratory Stratigraphic Service 2. NameofOperator ARCO Alaska, Inco 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 710' FNL, 660' FEL, Sec. 9, T7N, R9W, SM At top of productive interval 580' FNL, 745' FEL, Sec. 9, T7N, Rgw, SM (Approx) At effective depth 579' FNL, 741' FEL, Sec. 9, T7N, Rgw, SM (Approx) At total depth 6. Datum elevation (DF or KB) RKB 150' 7. Unit or Property name Soldotna Creek Unit ell number · +lA-? 9. Permit number 80-107 10. APl number 50-- 133-1 O129-01 11. Field/Pool 579' FNL~ 741' FEL~ Sec. 9~ T7N~ R9W~ SM (Approx) Swanson River Hemlock 12. Present well condition summary For SCU 41A-9 and for proposed sidetrack SCU 41B-9 ~IO,O00±MD Totaldepth: measured lO,900'MD(approx) feet Plugs(measured) 41A-9 plugged ~10,0"15' MD SCU41B-9 truevertica~o,895'MD(approx) feet (approx) Effective depth: measured 10,900'MD(approx) feet Junk (measured) SCU41B-9 trueverticalO,895'MD(approx) feet ,,, feet Casing Length Size Cemented Measured depth True vertical depth Structural 28 ' 20" 28 'MD 28 'MD Conductor Surface 1,998 ' 11-3/4" 1200 sx Intermediate 7" 5" Liner Abandoned frolm0~80/~A-9 1600 SX FOLqnS~'oposed $CU 41,~-9 1,200' 5" 150 sx Blend Perforation depth: measured 1,998 'MD 1,998'TVD 10,000' +MD 9,999' ±TVD 9,700'-10,900'MD 9699'-10895'TVD (approx) (approx) true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Description summary of proposal 13. Attachmeots August 18, 1989 Detailed operations program BOP sketch 14. Estimated date for commencing operation 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil .~ Gas ~ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~ -.~. ~~ Title FOR COMMISSION USE OF;ILY - Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance ~ ,~ ¢ ~. Mechanical Integrity Test __ Subsequent form required 10- ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Approved Copy Returned ..... Commissioner Oate 7/~ 7/~ ? ,,,,,, Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE scu SIDETRACK AND RE-DRILL SUMMARY: The following procedure outlines the planned work to sidetrack and re- drill the $CU 41A-9 (to be .abandoned via sundry application under ~ ~ and~complete the well in the Hemlock separate cover) formation as a single gravel pack. The procedure includes the cutting of approximately a 50 to 70 foot casing section in the existing 7" casing at 10,000'+ and then sidetracking from the original wellbore using conventional methods. The well will then be re-drilled to a total measured depth of approximately 10,900'. The new wellbore is planned for a minimum step out to the west and except for sidetracking out of and away from the original well will be a straight hole with as Iow of angle as possible. Following the re-drill a 5" liner will be run and cemented in place. The well will be completed as a single gravel pack in the Hemlock formation. Actual completion procedures will be determined after cased hole evaluation logs are run. SCU ~ SIDETRACK AND RE'DRILL PROCEDURE FOLLOWING ABANDONMENT OF THE SCU 41A-Cl. COMPLETION: 1. Circulate bottoms up and increase fluid density to 9.9 ppg. Pull out of hole. Test 7" caSing to 3,000 psi. 2. Perforate and squeeze 7" casing at proposed casing section from 9,950'- 10,050'+. 3. Drill out cement with drilling mud and clean out for cutting casing section. 4. Cut a 50' to 70' casing section from approximately 9,960 to 10,030'. 5. Set kick-off cement plug through casing section. Dress of cement to 5- 10' from the tOp o.f the casing Section. 6. Pick up 6" bit with .4-3/4" kick-off bottom hole assembly and run in hole. Orient the assembly to-the west using multi-shot gyro. Sidetrack well to the west. 7. Test the formation to a 12.5 ppg EMW. Drill a 6" hole to 10,900'+ with a minimum step out from the existing well bore maintaining as close to vertical as practical. 8. ConditiOn hole and run 5" liner from approximately 9,700' to 10,900'. 9. Cement liner with approximately 150 sacks of blended cement. 10. Clean cement out of casing and top of liner. Test casing to a minimum of 0.2 psi/ft. 11. Run cased hole logs (gamma ray, density and cement bond logs) and gyro survey. 12. Perforate and gravel pack well as a single gravel pack in the Hemlock formation. (Final procedure to be determined after logs are obtained). 13. Run 3-1/2" x 2-3/8" completion string. Set 3-1/8" 5M tree. Circulate well to lease crude. Release rig and turn well over to production. 13;-5/8 000 PSI BOP DIAGRAM , I' I IANNULAR 1 PRFYENTER PIPE RAMS BLI ND RAHS DRILLING SPOOL PIPE RAHS TB6 SPOOL 1 1-~/4" STARTING HEAD ALL BOP EQUIPMENT 5000 PSI RATED ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER II:VEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH WATER. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN LOCK-DOWN SCREWS IN HEAD. 3. OPEN CASING VALVE(S) ON TUBING HEAD. (MONITOR CASING VALVE FOR FLOW THROUGH OUT BOP STACK TEST). 4. CLOSE ANNULAR PREVENTER AND TEST TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO. 5. OPEN ANNULAR AND CLOSE TOP PiPE RAMS. TEST TOP PiPE RAMS, CHOKE MANIFOLD VALVES, AND STACK VALVES TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN TOP PIPE RAMS AND CLOSE BOTTOM PIPE RAMS. TEST TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 7. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. OPEN PIPE RAMS. 8. CLOSE CASING VALVE(S) AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF A NON-FREEZING LIQUID AND ALL VALVES ARE SET IN THE DRILLING POSITION. 9. TEST STANDPIPE VALVES TO 250 AND 4,500 PSI. 10. TEST KELLY COCKS AND INSIDE BOP TO 250 AND 4,500 PSI. 11. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 12. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. FUNCTION TEST BLIND RAMS EACH TIME OUT OF THE HOLE. 'Z" '"'" i~~ ~ .~ * TEST PRESSURES BASED ON 70% M.I.Y. OF 7" ,23#/FT, N-80 PRODUCTION CASING. ARCO Alaska( -c'"',:;::~e ' :-;ka 995'1%0360 : -:::ne July 18, 1989 Ms. PatW Bielaws~ AK Dept. of Govcmmcn~ C~r~afion Office of ~nagement and Budget 26~ Den~, S~te 7~ Anchorage, AK 99503 De~ Ms. Bielaws~: ARC~I~s~, ~. plus m pe~o~ a r~ll of ~wo wells - SCU 4~-9 ~d SCU 4~ a~ Swanson ~ver Field ~lling ~'s planned to ~in on or aborn August 1, 1989. All ~ work ~I1 b~ done from th~ exisfin~ well pads. ~ Plan of O~rafions for ~e re~ls is a~h~d as w~ll as ~ "Coas~ ~oj~ Qu~sfio~." We have applied for permits as follows: BLM: Permit to Drill, and Land & Water Management: Temporary Water Use. Copies of these applications are attached for your information. Our contact for the BLM permit is Joe Dygas, and for the Water Use permit is Bill Wright. If you have any questions, please do not hesitate to call me at 263-4675. Sincerely, Marcia P. Matthieu Cook Inlet Permits Coordinator MPM:es MPM/07/009 Enclosures: Plan of Operations CZM Questionnaire CC: J. Dygas, BLM, Anchorage* B. Richey, USFWS, Soldoma* J. Gabler, KPB, Soldotna* H. Friedman, ADEC, Anchorage B. Wright, DNR, Anchorage *with attachments .ARCO Alaska, Inc. ,s a Subsidiary of AllanticRichfietdCompany .xR3B-6003C ARCO Alaska, I, .... Office July 18, 1989 Mr. Henry Friedman AK Dept. of Environmental Conservation 3601 "C" Street, Suite 1350 Anchorage, Alaska 99503 Dear Mr. Freidman: ARCO Alaska, Inc. plans to perform a redrill of two wells, SCU 41B-9 and SCU 43B-8, at Swanson River Field in order to improve oil production. The drilling will begin on or about August 1, 1989. All the work will be done from the existing well pads. The Plan of Operations for these redrills is attached for your information. The drilling waste to be generated will consist of used mud and formation cuttings which will be confined to a metal "cuttings box" for transport to the Swanson River Field Central Disposal Facility, which is a lined, permitted facility for the disposal of this type of drilling waste. All pumpable liquids generated during the drilling and testing of the well will be injected into disposal well SCU 43-4. It is estimated that approximately 3000 barrels of drilling waste fluid will be injected in this manner. Our evaluation of the planned activities indicates that this is not storage and therefore, permits are not required. We request, however, that ADEC review and provide written concurrence with the plan outlined above. If you have any questions, please do not hesitate to call me at 263-4675. Sincerely, Marcia P. Matthieu Cook Inlet Permits Coordinator MPM:es MPM/07/010 Enclosures: Plan of Operations CZM Questionnaire cc w/o enclosures: P. Bielawski, DGC, Anchorage J. Dygas, BLM, Anchorage J. Gabler, KPB, Soldotna L. Leatherberry, ADEC, Soldotna B. Richey, USFWS, Soldotna L. Smith, AOGCC, Anchorage B. Wright, DNR, Anchorage July 18, 1989 Mr. Bill Wright Department of Natural Resources Land and Water Management P,O. Box 107001 Anchorage, AK 99510-7001 Dear Mr. Wright: ARCO Alaska Inc. (AAI) is planning redrill operations on two oil wells in the Swanson River Field commencing about the 10th of August, 1989. The wells involved are SCU 41B-9 and SCU 43B-8. As part of this activity, we plan to utilize groundwater from nearby water wells which were drilled prior to 1970. The drilling and testing activities on each well will last less than one month and we anticipate the daily water use to be approximately 10,000 gallons per day for each well.. In anticipation of these and future workover operations, AAI is by this application requesting a temporary water use permit for each of these wells from Land and Water Management. To minimize the administrative burden on AAI and the Division of Land and Water Management, it is preferred that AAI be issued a permit that would allow temporary use of any installed water well within the field for a period of at least one year. We feel that one permit would address the multiple anticipated activities in the field. Periodic reports would be provided to ensure that the State and US Fish and Wildlife Service records are complete. We would, however, continue to obtain USF&WS and BLM authorizations for field operations as needed. I have attached for your information the Plan of Operations that applies to the two subject wells and the required checks for $50.00. If you have any questions or need additional information about these drilling operations, Please call me at 263-4675. I hope to hear from you at your earliest convenience due to the short time frame before the work is planned to begin. Sincerely, Marcia P. I~latthieu Cook Inlet Permits Coordinator MPM:es MPM/07/011 MPM:es MPM/07/011 Enclosures: Plan of Operations CZM Questionnaire CC W/O enclosures: P. Bielawski, DGC, Anchorage J. Dygas, BLM, Anchorage H. Friedman, ADEC, Anchorage J. Gabler, KPB, Soldotna L. Leatherberry, ADEC, Soldotna B. Richey, USFWS, Soldotna L, Smith, AOGCC, Anchorage STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Alter casing __ Change approved program 2. Name of Operator ARCO Alaskas Inc. 3. Address P. 0. Box 100360s Anchorage, AK 4. Location of well at sudace Suspend __ Operation shutdown __ Re-enter suspende(I well __ Repair well __ Plugging .~ Time extension __ Stimulate __ Pull tubing __ Variance __ Perforate __ Other 5. Type of Well: Development ~_ Exploratory __ I Stratigraphic __ 9951 0 - 0360 Service __ 710' FNL~ 660' FEL~ Sec. 9,' T7N, Rgw, SM At top of productive interval 615' FNL~ At effective depth 617' FNLs At total depth 614' FNL, 706' FEL, Sec. 9, T7N, Rgw, SM 12. Present well condition summary Total depth: 710' FEL, Sec. 9, T7N, Rgw, SM 708' FEL, Sec. 9, T7N, Rgw, SM measured 1 0847 ' MD feet Plugs(measured) true vertical 1 0845 ' T V D feet Effective depth: measured 1 0795 ' N D feet Junk (measured) true vertical 10793 ' T V D feet Casing ~ngth Size Cemen~d Measureddepth Structural 28' 20" To surface 28'MD Surface 1998' 11-3/4" 1200 sx 1998'MD Intermediate 10340' 7" 1600 sx 10340'MD Liner 709' 5" 68 sx 10845'MD 6. Datumelevation(DForKB) RKB 150' feet Z UnitorPropertyname Soldotna Creek Unit 8. Well number 41A-9 9. Perr~it number 80-107 10. APl number 50-- 133-10129-01 -~ 11. Field/Pool Swanson River Field None /Vann Gun ~ +1 0750' Fishing tools ~-*-10745 True vertical depth 28'TVD 1998'TVD 10339'TVD 1 0843 ' TVD Perforation depth: measured true vertical 10s727'-10,743' 10s725'-10,741 ' RECE!VE:D ~laska Oil & Gas Cons. C0mlil~ Tubing (size. grade, and measured depth) 3-1/2" N-80 ~ 979~ 3½" J-55 f/979-10~032~ 2-3/8" N-80 f/10,032-10,599 Packers and SSSV (type and measured depth) Baker SC-1 Packer ~10~599a No SSSV 13. Attachments Description summary of proposal Well Schematics 14. Estimated date for commencing operation Detailed operations program __ BOP sketch Anchorage 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Status of well classification as: Oil ~ Gas ~ Suspended Signed Title Area Engi neer Conditions of approval: N,otif)/Commission so representative may witness Plug integrity .,~ BOP Test -- ' Location clearance __ Mechanical I~eg¥ity Test __ Subsequent form required 10- ORIGINAL SIGNED BY ,~. Approved by order of the Commission LONNIE C. SMITH Commissioner Form 10-403 Rev 06/15/88 !Appr°val N°~/'~ /Z~ '~ ~-~ Approved Copy Returned SUBMIT IN TFIIPLICATE SCU 41A-9 PLUG & ABANDONMENT SUMMARY: The proposed plugging and abandonment of the current SCU 41A-9 completion has been planned ~~._.as the initial steo~k in ...... sidetr, ackin(~..._ ..-the existing well and re-drilling it permitted under separate cover). The abandonment procedure calls for the squeezing of the current producing perforations with as much cement as possible through the existing gravel pack completion using a cement retainer. An additional cement plug will be set on top of the retainer to approximately 50' above the 5" liner top, thus sufficiently plugging the current perforations and liner top prior to beginning the sidetracking and re-drilling operations. RECEIVED gUL2Otgg9 Alaska Oil 8, Gas Cons. (;ornmissio~ Anchorage SCU 41A-9 PLUG & ABANDONMENT PROCEDURE (prior to sidetracking as SCU 4'~i1~-9) Pre-riq work: 1. Rig up slickline unit and pull dummy valve from GLM at 10,528'. 2. Circulate and kill well with 9.2 ppg brine. Drilling mud may be used if necessary. (Offset BHP converted to 10,725 TVD = 4,990 psi) 3. Set BPV in tubing hanger. Riq work: 1. Move in and rig up Grace Drilling Co.'s Rig # 154. . Ensure well is dead. Nipple down tree and nipple up 7-1/16" 5M x 13-5/8" 5M DSA and 13-5/8" 5M BOP stack. Pull BPV and set two- way check test plug. Test BOP's to 4,500 psi. Test annular preventer to 3,500 psi. . Pull test plug. Screw into tubing hanger with joint of 3-1/2", 9.2#/ft N-80, BT&C tubing. Pick up on tubing string until seal assembly is above gravel pack packer at 10,596'. Circulate bottoms up. 4. Pull out of hole with tubing string and seal assembly. o Run in hole with 5" 18# cement retainer on tubing. Set retainer at 10,550'+. (Approximately 50' above gravel pack packer.) Test retainer with string weight and 1,000 psi. 6. Squeeze cement below retainer into gravel pack completion (approximately 10-15 sacks). Unsting from retainer and spot a balance cement plug (approximately 45 sacks) on top of retainer such that the final top of cement is at 10,075'+ (50'+ above 5" liner top at 10,136'). 7. Pull out of cement to 10,075'. Reverse out any excess cement. 8. Begin sidetrack operations according to Well Plan ~ o.-:~-~: ;=~._ · .......... WELL PROFILE CURRENT COMPLETION RAN 6/14/88 COMPANY ARCO ALASKA, INC C, AS~G CAS~G C, AS~NG UNER ~, SCU 41A-9 SEE 20" 1.3/4 7" 5" 29 28 FEU:) SWANSON RIVER WE~H? '~ 2 3 # I 8 # STATE ALASKA GRAr:E N- 8 o N- 8 o D~TE 7 - 8 9 THRF.~ 8RD COMPLETION DETAIL DEPTH ~ gg8' 1 0340' 101 3. 1084! 3-1/2-, 9.2#,N-80, BTC AB MOD (0 - 979.) 3-112', 9.3#, J-55, EUE 8RD AB MOD (979' - 1003Z) WITH A BAKER 3-112' X 1' FMHO-1.0 GLM EUE 8RD AB MOD, W/DUMMY VALVE, BK-2 LATCH AT 2019'. - 10136' TOL - 7' ~ 10340' 10,032' - 10,599' 2-3/8" 4.7# N-80 EUE 8rd AB MODTBG 10,528: 2-3/8" X 1" MERLA TMPDX GLM, EUE 8RD AB MOD, WITH A 28/64" CV (ONE JT ABOVE 'X' NIPPLE) 10,565' 2-3/8" OTIS 'X' NIPPLE, EUE 8RD AB MOD, 1.875' ID (ONE JT ABOVE SEAL ASSEMBLY) LOCATOR SEAL ASSEMBLY (10' OF STROKE) EUESRD AB MOD 10,599' GRAVEL PACKER PERFORATED NIPPLE SAFTETY JOINT 10714' 2-3/8" 4.6~ N-80 NU 10rd .020 GUAGE WELDED GP SCREEN 10727' - 10743' ADDED PERFS AND RE-PERFS 10740'- 10752' ORIGINAL PERFS FISH AND FILL BELOW 10745' MD 5" @ 10845' PROPOSED PLUG AND ABANDON WELL PROFILE ,, , ~Am, ARCO ALASKA, INC Va].L SCU 41A-9 ~ SWANSON RIVER ~A~ ALASKA ~ N.00 N.oo ~ * 7-89 ~ ,,,enD_ COMPL~ON D~A~L ~ lOOt' 10240' 10138 , 10148 PROPOSED AREA OF SCU 4lB-0 SIDETRACK O 10,000' CEMENT PLUG FROM 10,075' - 10,550' _+ 10,136' 10,550' +- CEMENT RETAINER CEMENTAGUE;Trn BELOW FIETANER 10,SOO* GRAVEL PACKER PERFOi~TED NI~LE G,P. COMIq. ETiON 'SQUE~ WITH CEMENT 10714' 2-3~' 4.6~ N-80 NU 10rd .020 GUAGE WELDED GP SCREEN 1072T - 10743' ADDED PERFS AND RE-PERFS 10740'- 10752' ORIGINAL PERFS FISH AND RLL BELOW 10745' MO · 5' O 1084~' 1:3-5/6 '5000 PSI BOP DIAGRAM ACCUMULATOR CAPACITY TEST ! , I IpANNULARREYENTER1 PIPE RAHS BLI ND RAHS DRILLING SPOOL PIPE RAHS · ! !, \~ I 1 -:~/4" J'--"l STARTING j HEAD 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER UMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP ST/~I( TEST 1. FILL BOP STACK AND MANIFOLD WITH WATER. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN LOCK-DOWN SCREWS IN HEAD. 3. OPEN CASING VALVE(S) ON TUBING HEAD. (MONITOR CASING VALVE FOR FLOW THROUGH OUT BOP STACK TEST). 4. CLOSE ANNULAR PREVENTER AND TEST TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO. 5. OPEN ANNULAR AND CLOSE TOP PIPE RAMS. TEST TOP PIPE RAMS, CHOKE MANIFOLD VALVES, AND STACK VALVES TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN TOP PIPE RAMS AND CLOSE BOTTOM PIPE RAMS. TEST TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 7. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 250 AND 4,500 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. OPEN PIPE RAMS. 8. CLOSE CASING VALVE(S) AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF A NON-FREEZING UQUlD AND ALL VALVES ARE SET IN THE DRILLING POSITION. 9. TEST STANDPIPE VALVES TO 250 AND 4,500 PSI. 10. TEST KELLY COCKS AND INSIDE BOP TO 250 AND 4,500 PSI. 11. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 12. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. FUNCTION TEST BUND RAMS EACH TIME OUT OF THE HOLE. ALL BOP EQUIPMENT 5000 PSI RATED '- * TEST PRESSURES BASED ON 70% M.I.Y. OF 7" ,23#/FT, N-80 PRODUCTION CASING. · STATE OF ALASKA ALASKA OiL AND GAS CONSERVATION COMMISSION ELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~? GAS [] SUSPENDED ~ ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 80-107 3. Address 8, APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50- 133-10129-01 4. Location of well at surface 9. Unit or Lease Name 710' FNL, 660' FEL, Sec. 9, T7N, Rgw, SM Soldotna Creek Unit At Top Producing Interval 10. Well Number 615' FNL, 710' FEL, Sec. 9, T7N, Rgw, SM SCU 41A-9 At Total Depth 11. Field and Pool 614' FNL, 706' FEL, Sec. 9, T7N, Rgw, SM Swanson River - Hemlock 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. RKB 150'I A-028997 12. Date Spudded _ .04/21/81 ~'/;~O~ ~t 13. Date T. D. Reached05/24/81 14' Date C°mp" Susp' or Aband' I 15' Water Depth° if °ffsh°re ] 16' N°' °f C°mpleti°ns06/02/81 * N/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10847 'MD/10845 'TVl 10795 'MD/10793" ~0Es ~ NO []! N/A feet MD N/A _ 22. Type Electric or Other Logs Run D I L,FDL,Neutron,Densi 1 oq ,GR,Densi 1 og/Neutron, DI FL,Dual Neutron, CBL/VDL. GR/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESlZE CEMENTING RECORD AMOUNT PULLED 20" .... -~,'r~= ?8' -- To 11-~/b." b. 7.~ .... Surf !998' !5-!/2" !200 sx cmt 7,, .... Surf !038/~.' !0-5/81'1 !500 ~_.v. cmt .... 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2"/2-3/8' 10745 ' 10599' 10727'-10743'MD/10725'-10741 'TVD w/8 spf ... 10740 '-10752 'MD/10738 ' -10750'TVD w/4 sp.f 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 10660'-10674' ~' 50 sx Class G 10758 ' -10734 ' 10600'-10674' 50 sx Class G 2~/A pRODUCTION TEST .... . Date First Production Method of OPeration (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA ,, Brief description of lithology, porosity, fractUres, apparent dips and presence of oil, gas or ware r. Submit core chips. None RECEIVED · Note: RD 06/02/81. Workovers performed 4/29/82, 8/30/85 and 6/14/88. '~'~':'~.~ji-A[', qc~- '!~'~ '~f~";~J~:~': ' !'~slm 0il & Gas Cons. C0rnmissim~. ,, ~nch0rage Form 10-407 Submit in duplicate Rev. 7-1-80 021/WC6 CONTINUED ON REVERSE SIDE N/A N/A · . .. . __ 31, LIST OF ATTACHMENTS Addendum (dated 6/29/88) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge · INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 2,4: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (D.F, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10~407 ADDENDUM WELL: 5/13/88 5/15/88 5/21/88 5/22/88 5/23/88 6/16/88 6/18/88 SCU 41A-9 RU Precision WL, shoot fluid level @ 899' on 7" x 3½" ann. Tbg full, 7" ann @ 530 psi, tbg @ 50 psi. RIH w/kickover tl on 1" JDS pulling tl; latched dummy @ 7772'; unable to shear off. POOH w/l" dummy. Redress pulling tl. GIH, latch dummy @ 9999', pull dummy, POH. RIH w/kickover tl, att to reset dummy @ 7772' w/o success. POOH; lost dummy in hole (1" OD, 17" long). PU 2nd 1" dummy & kickover tl, GIH, set dummy @ 7772', POOH, RU Precision WL. GIH w/2.3" OS & 1-1/8" grapple, tag @ 10,752' WLM, att to engage 1" dummy vlv fsh, POOH; no rec'y. Chg out grapple to 7/8", GIH, wrk fsh'g string, POOH; no rec'y. MU knuckle jt above OS & 7/8" grapple, TIH, att to latch onto fsh, POOH; no rec'y. MU 2nd knuckle jt on top of OS & grapple, GIH, tag fsh, att to engage, POOH; no rec'y. Remove 1 knuckle jr, add 1 wt bar, GIH, engage fsh, att to wrk, POOH; no rec'y. RIM w/"R" shifting tl, att to engage fsh, POOH; no rec'y. RD WL & secure well. Pull BPV. Circ well w/8.7 ppg brine. NU BOPE stack to blind plug. Rig on location. Rn accumulator ins to BOP & tst. Tst blind rams to 5000 psi; OK. ND tree, NU & tst BOPE. Make repairs on BOPE. Re-tst to 5000 psi; OK. RU rotary & stand pipe. MU lnd'g jr. Pull tbg hgr to rig floor & LD same. Circ. POOH & LD 3½" tbg. RU E-LinE & rm GP Evaluation log f/10,745' to pkr @ 10,598', RD DA. RU Dowell, displ well to crude by pmp'g dn ann. SI pressure = 1100 psi. RU WL, RIH w/2" kickover to GLM @ 10,504' WLM. I. atch 1" circ'g vlv, pull vlv, POOH. RIH to GLM @ 10,504' WLM, set vlv, POOH, RD WL. · Drilling Supervisor ARCO AL~S~ INC. Cook Inle~qew Ventures Engineering TRANSMITFAL #301 TO:. John F. Boyle COMPANY: AOCK2C DATE: March 21, 1989 FROM: Tom Wellman COMPANY: ARCO Alaska, Ine WELL NAME: Listed Below Transmitted herewith are the following ""Blue Sepia Sepia Line Folded Rolled~ Mylar Tape Temperature Log SCU 41'9A 1 1 Receipt Acknowledgement: Gas Cons. commission Return reciept to ARCO ALASKA, Inc. ATrN: Judy Boegler ATO 1390A Post Office Box 100360 Anchorage, AK 99510- ARCO ALASKA INC. Cook Inlet/New Ventures Engineering TRANSM1Tr~ #293 T~. John F. Boyle COMPANY: AOGCC DATE: Jan. 27, 1989 FROM: Tom Wellman COMPANY: ARCO Alaska, Inc WELL NAME:Listed below Transmitted herewith are the following Blue Sepia Sepia Line Folded Rolled Mylar Tape Pressure Drawdown Record SCU 41-9A 1 1 Casin[~ Collar ..Lo. ~ SRU 21-34 1 1 Cement Evaluation SRU 21-34 1 1 . Receipt Acknowledgement: Date: Remm reciept to ARCO ALASKA, Inc. ATrN: Judy Boegler Post Office Box 100360 Anchorage, AK 1989 Oil & Gas ~ons. ¢Om~lss/otl ~.n~horage ARCO ALASKA INC. Cook Inlet/New Ventures Engineering TRANSM1TrAL #278 TO: Commissioner COMPANY: AOGCC DATE: Dec.23, 1988 FROM: Tom Wellman COMPANY: ARCO Alaska, Inc WELL NAME:Listed below Transmitted herewith are the following - ['Bi~.Uee . Sepia Sepia Folded Rolled M~,lar Tape BRU 224-13 · ' Acoustic CBL 5" i 1 · PDK-100GRCCL 5" i 1 · COllar Log 5" 1 1 · Gamma Ray 5" 1 1 BRU 232-4 ,' Acoustic CBL VDL/Si~m/GR 5" 1 1 SCU 4IA-9 , , ~ Production Log 5" , 1 1 , Receipt Acknowledgemem: A~: Judy B~ ATO 1390A Post ~fice Box 1003~ Anchorage, ~ 99510- STATE OF ALASKA ALAS~,~ OIL AND GAS CONSERVATION COMN..,sSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: 2. Name of Operator ARCO Alaska, Inc. Operation shutdown [] Alter Casing [] Other Stimulate [] Plugging [] Perforate~(] Pull tubing W0RKOVER 5. Datum elevation (DF or KB) RKB 150' 3. Address 6. P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 7. 710' FNL, 660' FEL, 5ec.9, T7N, Rgw, 5M At top of productive interval 8. Unit or Property name Soldotna Creek Unit Well number 41A-9 Approval number 615' FNL, 710' FEL, Sec.9, T7N, Rgw, SM At effective depth 617' FNL, 708' FEL, 5ec.9, T7N, Rgw, SM At total depth 614' FNL, 706' FEL, Sec.9, T7N, Rgw, SM 8-213 9. APl nu'mber 501 133-10129-01 10. Pool Swanson Ri ver Field 11. Present well condition summary Total depth: measured 10847'MD true vertical 10845'TVD Effective depth: measured 10795 'MD true vertical 10793'TVD Casing Length Structural 28' Surface 1998' Intermediate 10384' Liner 709' feet Plugs (measured) None feet feet Junk (measured) feet Vann Gun @ ±10750' Size Cemented Measured depth 20" To surface 28 'MD 1 1-3/4" 1200 sx cmt 1998 ' MD 7" 1600 sx cmt 10384'MD 5" 68 SX Class G 10136'-10845'MD ~ueVertical depth 28'TVD 1998'TVD 10383'TVD 10135'-10843'TVD Perforation depth: measured 10727'-10743'MD (8 spf) 10740'-10752'MD (4 spf) true vertical 12. 10725'-10741'TVD Tubing (size, grade and measured depth) 3-1/2"/2-3/8", N-80/J-55 tbg w/tail ~ 10745' Packers and SSSV (type and measured depth) SCl-L GP pkr ~ 10599' Stimulation or cement squeeze summary N/A Intervals treated (measured) 10738 ' -10750' TVD Oil & GaS Cons. Commission ,. Anchorage Treatment description including volumes used and final pressure 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments (Workover Well Hi story w/Addendum, dated 5/24/88) Daily Report of Well Operations I~ Copies of Logs and Surveys Run [] 15. I hereby certify that the fOregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1~ Title Associate Enqineer Date (Dani) SW03/010 Submit in Duplicate Feet ARCO Oil and Gas Company" v Well History - Initial Report - Daily Instructions: Prepare and Submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District ~ County, parish or borough ARCO ALASKA INC. I SOLDOTNA CREEK UNIT Field Lease or Unit SWANSON RIVER FIELD ADL: 028997 Auth, or W.O. no. ITifle AD6188 I WORKOVER I Well no. SCU 41At9 ]Sta~K API: 50-133-10129-01 Operator ARCO Spudded or W.O. begun IDate ]Hour ACCEPT 05/21/88 Date and depth as of 8:00 a.m. 05/21/88 ( TD:10847 PB=10795 SUPV:JC 05/22/88 ( TD:10847 PB:10795 SUPV:JC 05/23/88 ( TD:10847 PB:10795 SUPV:JC 05/24/88 ( TD:10847 PB:10795 SUPV:JC 05/25/88 ( TD=10847 PB=10795 SUPV:JC 05/26/88 ( TD:10847 PB:10795 SUPV:JC 05/27/88 ( TD:10847 PB:10795 SUPV:JH Complete record for each day reported ROLL'N RIG 5 0230 FRS IARCO W.I. 49.00,00 Prior status if a W,O, NU BOPE'S 5-1/2"@ 10845' MW: 0.0 MOVE RIG AND RU ON 41A-9. FILL PITS W/ BRINE. RU LINES. ACCEPTED RIG @ 0230 FRS, 5/21/88. PULL BPV. CIRC t~ELL W/ 8.7 BRINE. NU BOPE. DAILY=S26,725 CUM:$26,725 ETD:S26,725 EFC=$600,000 RU FLOWLINES 5-1/2"@ 10845' MW: 0.0 RU LINES TO BOPE. FUNCTION TEST SAME. TEST BLIND RAMS. ND TREE AND NU BOPE. TEST SAME. RAISE SUB, CAT WALK, BEAVER SLIDE AND FLOWLINES. DAILY:S21,650 CUM:$48,375 ETD:S48,375 EFC:$600,000 LD 2-7/8" TAILPIPE 5-1/2"@ 10845' MW: 8.7 NACL RU ROTARY AND STAND PIPE. MU LANDING JT. PULL TBG HGR. SAME. CIRC. POOH LD 3-1/2" TBG AND 2-7/8" TAILPIPE. LD DAILY:S19,449 CUM:$63,624 ETD:S63,624 EFC:$600,000 CUT DRLG LINE 5-1/2"@ 10845' MW: 8.7 'NACL TALLY BHA AND 3-1/2" TBG. RU FLOOR. SET WB. RU BHA AND 3-1/2" DP. REPAIR MOTOR. PU 3-1/2" DP. CBU. CUT DRLG'LINE. DAILY:S20,117 CUM:$83,741 ETD:S83,741 EFC:$600,000 POOH 5-1/2"@ 10845' CUT DRLG LINE. POOH. RIH. CIRC. POOH. POH W/ 3-1/2" DP TO LD CSG SCRAPER. MW: 8.7 NACL SLIP DRLG LINE. DAILY:S17,450 CUM:$101,191 ETD:S101,191 ATTEMPT TO REMOVE SPOOL 5-1/2"@ 10845' MW: 8.7 NACL FIN POOH. PU 7" RBP. RIH 64 STDS. CHANGE ORDERS. POOH. PU 5" RBP. RIH. SET RBP AT 10589'. POOH I STD. TEST CSG TO 2000 PSI. HANG STRING OFF ON 7" HOWCO STORM PKR SEATED 2' BELOW TBG SPOOL. ND BOPE'S. ATTEMPT TO REMOVE TBG SPOOL. DAILY:S17,450 CUM:$118,641 ETD:S118,641 EFC:$600,000 RECEIVED' EFC=$600,000 Alask~ Oil & Gas Cons. Commission Anchorage PREP TO REAM TIGHT SPOT 5-1/2"@ 10845' MW: 8.7 NACL REMOVE AND CLEAN OUT TBG SPOOL. TEST PACKOFFS TO 3000 PSI. BOPE'S. TEST SAME TO 3000 PSI. NU BOPE. TEST TO 5000 PSI. PULL 7" STORM PKR. ENGAGE 5" RBP AND POOH. PU 4-1/8" MILL. RIH. TAG TIGHT SPOT AT 10637'. RU KELLY. PREP TO REAM. DAILY:S24,304 CUM:$142,945 ETD=S142,945 EFC:$600,000 NU The above is correct Signature For form preparatlo~l%nd distribution, see Procedures Ma(~llal, Section 10 Dri ng. Pages 86 al%d 87. rDate Title ASSOCIATE ENQINEER ARCO Oil and Gas Company Daily Well. History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final comoletion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ARCO ALASKA INC. Field SWANSON RIVER FIELD County or Parish IState SOLDOTNA CREEK UNIT Lease or Unit SCO 41A-9 Well no, Date and depth as of 8:00 a.m. 05/28/88 ( TD:10847 PB:10795 SUPV:JH 05/29/88 ( TD:10847 PB:10795 SUPV:JH 05/30/88 TD:10847 PB:10795 SUPV:JH 05/31/88 ( 11 TD:10847 PB:10795 SUPV:JH 06/01/88 ( 12 TD:10847 PB:10795 SUPV:JH 06/02/88 ( 13 TD:10847 PB:10795 SUPV:JC 06/03/88 ( 14 TD=10847 PB:10795 SUPV=JC 06/04/88 ( 15 TD:10847 PB:10795 SUPV:JC Complete record for each day while drilling or workover in progress ROLL'N RIG 5 POOH 5-1/2"@ 10845' MW: 8.7 NACL MILL AND REAM F/ 10637' TO 10745'. TAG FISH AT 10745' CBU POH. PU OS W/ 1" GRAPPLE AND RIH. HIT TIGHT SPOT AT 10637'. COULD NOT WORK THROUGH. DAILY:S21,929 CUM:$164,874 ETD:S164,874 EFC:$600,000 RIH 5-1/2"@ 10845' MW: 8.7 NACL POOH. CLEAN OUT OS~ RIH. ATTEMPT TO ENGAGE FISH. POOH. RECOVERY. REDRESS OS. RIH. NO DAILY:S21,970 CUM:$186,844 ETD:S186,844 EFC:$600,000 POOH 5-1/2"@ 10845' MW: 8.7 NACL RIH. ATTEMPT TO ENGAGE FISH. POOH. NO RECOVERY. LD OS. PU 4-1/2" BURNING SHOE. RIH. MILL TIGHT SPOTS AT 10641' TO 10661' MILL OVER FISH AT 10745' TO 10747'. POOH. DAILY:S19,970 CUM:$206,814 ETD:S206,814 EFC:$600,000 RIH 5-1/2"@ 10845' MW: 8.7 NACL POOH. PU 4-1/2" OS W/ 3" GRAPPLE. RIH. TAG TIGHT SPOT AT 10655'. WORK OS TO 10655'. POOH. PU 4-1/2" OS W/ TUNGSTON BTM. RIH. DAILY:S19,970 CUM:$226,784 ETD:S226,784 EFC:$600,000 GIH WITH DP 5-1/2"@ 10845' MW: 8.7 NACL GIH. REAM TIGHT SPOTS. ATTEMPT TO ENGAGE FISH. POOH. LOST OS BOWL AND GRAPPLE. WAIT ON FISHING TOOLS. BREAK AND INSPECT DC'S. GIH WITH TAPER TAP. DAILY:S19,670 CUM:$246,454 ETD:S246,454 EFC:$600,000 TOOH 5-1/2"@ 10845' MW: 8.7 NACL TIH WITH TAPER TAP. BREAK CIRC AND TAG FISH. TOH. SERVICE RIG. TOH. RECOVER GRAPPLE CONTROL. MODIFY TAPER TAP. TIH. PU KELLY AND TAG FISH. TOL. SLIP DRILLING LINE. TOOH. DAILY:S19,670 CUM:$266,124 ETD:S266,124 EFC:$600,000 TIH WITH STRING MILL 5-1/2"@ 10845' MW: 8.7 NACL TOOH. NO FISH. TIH WTIH TAPER TAP. TAG INTO FISH @ 10745'. TOOH. NO FISH. TIH WITH STRING MILL. DAILY:S19,670 CUM:$285,794 ETD:S285,794 Alaska Oil & Gas Cons. Cammissi0n EFC: $600,000 Anchorage TIH W/ STRING MILL 5-1/2"@ 10845' MW: 8.7 NACL TIH. REAM AND MILL TO TOF AT 10745'. MU NEW 4-1/8" MILL AND TIH. DAILY:S19,585 CUM:$305,530 ETD:S305,530 EFC:$600,000 The above is correct Signature ~, ~~' For form preparatioq/~nd distribution see Procedures Ma~u~l Section 10, Drilling, Pages 86 at,~ 87 Date [ Ti ti e AS,?~3ClATE ENGINEER ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Produc ng Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District ICounty or Parish IStateAK ARCO ALASKA INC'. I SOLDOTNA CREEK UNIT I ' Field ILease or Unit SWANSON RIVER FIELD I SCU 41A-9 Complete record for each day while drilling or workover in progress Date and depth as of 8:00 a.m. 06/05/88 ( TD:10847 PB:10795 SUPV:JC 06/06/88 ( TD:10847 PB:10795 SUPV:JC 06/07/88 ( TD:10847 ?B:10795 SUPV:JC 06/08/88 ( TD:10847 PB:10795 SUPV:JC 06/09/88 ( TD:10847 PB:10795 SUPV:JC 06/10/88 ( TD:10847 PB:10795 SUPV:JWH 06/11/88 ( TD:10847 PB:10795 SUPV:JWH 7) 8) ROLL'N RIG 5 IWell no. TOH W/ TAPER TAP 5-1/2"@ 10845' MW: 8.7 NACL REAM THROUGH TIGHT SPOTS W/ STRING MILL F/ 10639' TO TOF AT 10745'. WAIT ON CHAIN F/ DRAWWORKS AND REPAIR SAME. TOH. LD STRING MILL. PU TAPER TAP AND TIH. TAG INTO FISH AT 10745'. TOH. DAILY:S19,685 CUM:$325,035 ETD:S325,035 EFC:$600,000 FILTERING UNIT DOWN 5-1/2"@ 10845' MW: 8.7 NACL TOH W/ TAPER TAP. TIH W/ 4-1/2" MILL. CDL. TIH TAG TOF 5' HIGH. ATTEMPT TO WASH DOWN. RU AND PUMP 30 BBLS PILL W/ 2 PPG SAND. CIRC PILL AROUND. RU TO REV CIRC AND FILTER BRINE. FILTER UNIT GENERATOR DOWN. WO GENERATOR. DAILY:S42,190 CUM:$367,225 ETD:S367,225 EFC:$600,000 JARRING @ 10665' 5-1/2"@ 10845' MW: 8.7 NACL WIRED INTO SPARE RIG GENERATOR TO FILTERING UNIT. CIRCULATE & FILTER BRINE. TOH. MU 4-1/8" MILL. TIH. CUT DRILLING LINE. TIH & MILLED ON FISH. JAR ON STUCK PIPE @ 10665'. DAILY:S21,575 CUM:$388,800 ETD:S388,800 EFC:$600,000 CUT DRILLING LINE 5-1/2"@ 10845' MW: 8.7 NACL JARRED ON STUCK BHA. RU STRING SHOT & RIH. BACKED OFF 270' ABOVE JARS. MU BACKOFF. BACKED OFF @ 10656'. POH & RD WIRELINE. TOH WITH DP. BREAK, INSPECT, & RE-TORQUE BHA. MU 4-3/4"JARS & SCREW-IN SUB, STRAP AND TIH. CUT DRILLING LINE. DAILY:S28,675 CUM:$417,475 ETD:S417,475 EFC:$600,000 MILL ON OBSTRUCTION 5-1/2"@ 10845' MW: 8.7 NACL RIH TO 10656' AND ENGAGE FISH. JAR FISH FREE. POOH. PU MILL. RIH. TAG OBSTRUCTION AT 10669'. MILL AT 10669'. DAILY:S15,885 CUM:$433,360 ETD:S433,360 EFC:$600,000 RECEIVED RU 2-3/8" TUBING 5-1/2"@ 10845' MW: 8.7 NACL MILLED THROUGH TIGHT SPOT @ 10669'. FILTER FLUID. POOH. RU DRESSER. RAN CCL/GR F/1013~'-10747' . GIH. PERF AI~ 0ii & GaS C0~S. 10743'-10727' W/4 SPF,' 120 DEGREE PHASE. RAN GR/JB TO 10700'. RD WIRELINE. PU SURGE VALVE AND 2-3/8" TUBING. DAILY:S18,385 CUM:$451,745 ETD:S451,745 EFC:$600,000' PU BHA; TIH 5-1/2"@ 10845' MW: 8.7 NACL RIH. SET PACKER @ 10640'. SURGE FORMATION; REVERSE OUT. POH. CUT DRILLING LINE; FINISHED POH. LD BAKER TOOLS. PU BHA; TIH. DAILY:S30,544 CUM:$482,289 ETD:$482,289 EFC:$600,000 The above is correct Signature ~,f~ ~j~ For form preparation j~ distribution see Procedures Manu[¥ Section 10, Drilling, Pages 86 anff 87 · IDate ITitle ~SSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing coring or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Produc ng Sect on will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District Field Date and depth as of 8:00 a.m. I County or Parish ARCO ALASKA INC. I SOLDOTNA CREEK UNIT I Lease or Unit SWANSON RIVER FIELD I SCU 41A-9 Complete record for each day while drilling or workover in progress ROLL'N RIG 5 06/12/88 ( 2: TD:10847 PB:10795 SUPV:JWH 06/13/88 TD:10847 PB:10795 SUPV:JWH 06/14/88 ( 2f TD:10847 PB:10795 SUPV:-JWH IStatL POH 5-1/2"@ 10845' HN: 8.7 NACL RIH. TAGGED TIGHT SPOT @ 10634' AND REAMED. TAGGED SAND @ 10679'. CLEANED OUT SAND FROM 10679'-10747'. CIRCULATE BOTTOMS UP. POOH TO LINER TOP. REV. CIRCULATE OUT. POOH. DAILY:SIS, 185 CUM:$500,474 ETD:S500,474 EFC:$600,000 POOH LDDP 5-1/2"@ 10845' MW: 8.7 NACL POOH. PU GP SCREEN & BLANK PIPE & SC-1 PACKER. RIH. TAGGED @ 10747'. DROP BALL AND SET PACKER. CIRCULATE & FILTER. RU DOWELL; PUMPED 10 BBLS, 12 PPG, 12-20m GP SLURRY, GRAVEL PACK & SCREEN OUT WITH 3000 PSI. CIRCULATE & REV. RETEST GP. POOH. LDDP. DAILY:S56,416 CUM:$556,890 ETD:S556,890 EFC:$600,000 5-1/2"@ 10845' MW: 8.7 NACL POOH LD DC'S. RU AND RUN 2-3/8" RUN COMP ASSY POOH LDDP. RIH W/ DC'S. AND 3-1/2" COMP ASSY. DAILY:S39,957 CUM:$596,847 ETD:S596,847 EFC:$600,000 IWsll no, RECEIVED Alaska Oil & Gas Cons. Anchorage The above is correct Date ITitle &SSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test IS not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District I Stat~K ARCO ALASKA INC. SWANSON RIVER FIW. T.D I Well no. SCU 41~-9 I County or Parish SOLDOTNA CREEK UNIT Field ~Lease or Unit Auth, or W.O. no. 028997 AD 6188 ij WORKOVER API: 50-133-10129-01 Operator A.R.Co. W.I. ~otal number of wells (active or inactive) on thisI Icost center prior to plugging and I ARCO 49. 0000 labandonment of this well Spudded or W.O. begun Date IHour I Prlor status if a W,O. ACCEPT 05/21/88 ~ 0230' HRS I Date and depth Complete record for each day reported as of 8:00 a.m ROLL'N RIG 5 RIG RELEASED 5-1/2"@ 10845' MW: 8.7 NACL RIH W/ 3-1/2" X 2-3/8" COMP£ASSY. LAND TBG AFTER SPACE OUT. NO SSSV, SCl-L GP PKR @ 10599', & TT @ 10745'. CHECK CIRC VALVE. RD RIG FLOOR AND SUB BASE. ND BOPE. NU 3-1/2" 5M TREE. TEST TREE TO 5000 PSI. SECURE WELL. CLEAN PITS. RELEASE RIG AT 1830 HRS 6/14/88. DAILY:S108,975 CUM:$705,822 ETD:S705,822 EFC:$600,000 06/15/88 ( 2 TD:10847 PB:10795 SUPV:JWH Old TD Released rig Classifications (oil gas, etc.) Producing method Potential test data Algska 0il & Gas Cons. Commission Anchorage JNew TD PB Depth Date [ K nd of r g I Type completion (single, dual, etc.) Official reservoir name(s) Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected __ The above is correct Signature IDate ITitle ASSOCIATE ENGINEER For form preparation/'lnd distribution see Procedures Mar~l, Section 10, Drilling, Pages 86 and 87. ADDENDUM 5/13/88 5/15/88 5/21/88 5/2'2/88 5/23/88 RU Precision WL, shoot fluid level @ 899' on 7" x 3½" ann. Tbg full, 7" ann @ 530 psi, tbg @ 50 psi. RIH w/kickover tl on 1" Jl~ pulling ti; latched dunuy @ 7772'; unable to shear off. 1DO(~ w/l" duTmy. Redress pulling tl. GIH, latch dmmy 0 9999', pull dunr~, 1DC[-I. RIH w/kickover ti, att to reset dunmy ~ 7772' w/o success. PO(~; lost dum~ in hole (1" CID, 17" long). PU 2nd 1" d~uuy & kickover ti, GIH, set dmmy ~ 7772', RU Precision WL. GIH w/2.3" O~ & 1-1/8" grapple, tag @ 10,752' WIM, att to engage 1" duuuy vlv fsh, 1DO[D; no rec'y. Chg out grapple to 7/8", GIH, wrk fsh'g string, BEXD[{; no rec'y. 1VIJ knuckle jt above C~ & 7/8" grapple, TIH, att to latch onto fsh, 1DCl2~; no rec'y, lVIJ 2nd knuckle jt on top of O~ & grapple, GIH, tag fsh, att to engage, POCI-I; no rec'y. RaT~ve I knuckle it, add 1 wt bar, GIH, engage fsh, att to wrk, P(DC~; no rec'y. RIH w/"R" shifting ti, att to engage fsh, FOCI-I; no rec'y. RD WL & secure well. Pull BPV. Circ well w/8.7 ppg brine. NU BOPE stack to blind plug. Rig on location, tin accurnlator Ins to BOP & tst. Tst blind rams to 5000 psi; (I<. ~ tree, NU& tst BOPE. Make repairs on BOPE. Re-tst to 5000 psi; C[<. RIJ rotary & stand pipe. 1VIJ lnd'g it. Pull tbg~ to rig floor & LD same. Circ. ~ & II) 3½" tbg. Gas (;ohs. AnchoraGe XEROX TELECOP I ER 295 ; 5-23-88; 4:56 PM; SWANSON ........ ............. [1~Y-23-',9S iT: E~E1 [E':~NE;Oh4 TEL HEi: i~;S5 .~ ~$E1~ PE11 - Mud Sv~em~' . Viuual Audi¢ ;~ e~c~ Inet, .... --'--' ....... i' Flow Mor, i~o= . _ ~ ., .... ~ ..... .... ~ .... ~" ~T: ..... , STATE OF ALASKA ALAS .... OIL AND GAS CONSERVATION COMI,. .,;SION APPLICATION FOR SUNDRY APPROVALS 1. TyPe of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing,~Amend order [] Perforate/~Other~ 2. Name of Operator ARCO A]aska~ Inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 710' FNL, 660' FEL, Sec. At top of productive interval 615' FNL, 710' FEL, Sec. At effective depth 617' FNL, 708' FEL, Sec. At total depth 614' 9, T7N, R9W, SM 9, T7N, R9W, SM 9, T7N, Rgw, SM FNL, 706' FEL, Sec. 9, T7N, Rgw, SM 5. Datum elevation (DF or KB) RKB 150' 6. Unit or Property name So]do1;na Creek Unil; 7. Well number 41A-9 8. Permit number 80-1n7 9. APl number 50-- ~-~n~q-n~ 10~ Pool Swanson River Field feet 11. Present well condition summary Total depth: measured true vertical 1 0847 ' MD feet Plugs (measured) None 1 0845 ' TVD feet Effective depth: measured 10795'MD feet Junk (measured) Vann (;un (~ ±10750' true vertical feet 1 0793 ' TVD Casing Length Size Cemented Measured depth True Vertical depth S1;ruc1;ura ] 28' 20" To surface 28'ND 28'TVD Surface 1998' 11-3/4" 1200 sx 1998'MD 1998'TVD I nterrnedi a1;e 10340' 7" 1600 sx 1 0340'ND 10339'TVD Liner 709' 5" 68 sx 10845'MD 10843'TVD RECEIVED Perforation depth: measured 1 0740 ' -1 0752 ' MAR 2 5 true vertical 1 0738' -1 0750 ' Alaska 0il & Gas Cons. Commission Anchorage Tubing ~!size, grade and measured depth) 3-1/2" N-80 ~ 10073', 2-7/8" N-80 f/10073'-10645', 2-3/8" N-80 f/10645'-10708' Packers and SSSV (type and measured depth) Baker FHL (~ t0071', no SSSV 12.Attachments Des6r, iption summary of proposal~;L Detailed operations program [] BOP sketch 13. Estimated date for commencing operation Nay t5, 1988 14. If proposal was verbally approved Name of approver Subsequent Work Repor~ocl on form No/~- ~t¢¢ Dated.~/~ Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed &~/~ _ _~l/,~J~_~ Title A ssocial;e E nainear- Commission Use Only ( SRS ) SA3/74 Conditions of approval [] Plug integrity Notify commission so representative may witness [] BOP Test [] Location clearance "ORIGINAL SIGNED BY Approved by LONNIE C. SMITH Approved C.opy Returne(~ Commissioner IApproval No. ~,.,=,~/_~ by order of · the commission Date ~-~_-~ '"'~ ~ Form 10-403 Rev 12-1-85 Submit in triplicate SCU 41A-9 Preliminary Procedure Clean Out And Gravel Pack 1. Move in and rig up Roll'N 5. Kill well with 9.0 ppg brine prior to rig arrival. 2. ND tree. NU BOPS and test same. 3. Pull and LD present completion. 4. Make a bit and scraper run to the top of the 5" liner. 5. PU burning shoe and 3-13/16" WP. GIH and wash/burn over top of Vann gun fish in order to get a fishing neck. 6. PU a slim hole overshot. GIH, catch fish and attempt to pull same. Note - Since the Vann gun fish is 3-3/8" OD, it is not possible to wash over it. If it can not be recovered, enough of it will have to be milled up to give sufficient rathole below perfs for the sump packer. 7. Make bit and scraper run in 5" liner to TD. Circulate well clean. 8. GIH with 5" RBP. Set same @ ±10600 and test casing to 2000 psi. .. 9. With RBP set, hang off DP on storm packer and change out tubing spool. POH w/stormpacker and RBP. 10. perforate 10740-10752 with wireline casing guns. 11. Perforate 10740-10752 underbalanced with tubing conveyed guns. Flow well 30 minutes to clean up perforations. 12. Clean out well to TD. Circulate fluid clean. 13. Run gravel pack assembly and gravel pack. 14. Run new completion. Release rig. 15. Run gravel ~pack evaluation log. RECEIVED z/o8/88 Alaska Oil & ~as Cons. Commissior~ , Anchorage 3bll.'J~ I 1111.~ qqqq.'lf ~oolo. a3 t iO&#J.13 Too o~ p~jj.,O ~./~s., $c,~ . so_t'7c~ t~ ISCU 41A-9 TUBING &CASING D£TAI WELL PROFILE I FIELD COMPLETION DETAIL 01AGRAM 2 - Final C.,~pletiofl -~_~ 5g~-~ ARCO ALASKa, INC SOLOOTNA CREEK ALASKA RECEIVED MAR 2 5 198.3 Alaska Oil & Gas Cons. Commission Anchorage I. Tubing, ',3vo 9, 5'~.u£E, Eb,'~3~q C/co-°` 2. Cross-over,' " 3. Tubing,2-]/8' 4.7= N-80 EUE 8r(I/I;B 4. 2-3/8' ffter~, "~;'~X C4.~, w/ I' circ. valve~ (I Jr. 5. 2-3/8' ows 'X' nipple. ( 1 Jr. above seal assembly) /eo3q . Locator tubing seal assembly, Baker model 'S-22', wi additional seal units to allow for I0' seal movement. 7. Gravel packer, Baker SC I-L ( 50A-26 ) 8. Gravel pack extentlon, Baker 20-26, with lower extentlon to accomodate I0' of seal movement. g. Salty joint, Baker model '6P', 2-3/8' NU lOrd. 10. ~" 2-3/8' 4.6' N-80 NU lOrd blank plpe wi welded blade centralizers for ,~"/~csg, 11...~:)/ - 2-3/8" 4.6= N-80 NU lOrd .r..~ gage Bake, rwela screen w/welded blade centralizers for5"/ECcsg. 12. O-Ring seal sub, Baker, 2-3/8' NU lOrd, I0' - 2-3/8' 4.6= N-80 NU lOrd .O~Ogage Bakerweld telltale screen. PKR ~r? 07~ ~' 14 Baker model'S' snap latch including 2, 40-26 seal 1.5. Sump Packer, Baker mOdel 'DB' 32-26. ANNULAR pREVENTER 7 PIPE RAMS. 6 BLIND RAHS 1. "SURFACE CASING 2. ' CASING HEAD "- 000 PSI FLANGE '~ "- O00P$1X "-5000PSI TUB lNG HEAD 4. "- 5000 PSI X 11"- 5000 PS1 CRO$$-OYER SPOOL. $, 11" - 5000 PSI BLIND RAMS 6. 11" - 5000 PSI PIPE RAMS 7. 11'*- 5000 PSI ANNULAR 10. 11. 12. 15. ACCUMULATOR CAPACIT, Y TEST I. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. :2. ,a~,~URE. THAT ACCUMULATOR PRE~,~SURE 13 3000 PS1 WITH 1500 PS1 DOWNSTREAM OF THE REGULATOR. :3. OI~$ERYE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNIT,5 PRESSURE. I EC E IV E D iYLAR 2 '° * ]..~ BOP STACK TEST ~daska Oil & Gas Cons. Commission - Anchorage 1'. FILL BOP STACK AND MANIFOLD WITH BRINE. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. CLO6E ANNULAR PREVENTER AND CHOKES AND BYPA,,~5 VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PS1 AND HOLD FOR 10 MINUTES. 5. INCREASE PRE~SURE TO 1800 PS1 AND HOLD FOR 10 MINUTES. BLEED TO ZERO P$1. 6. OPEN ANNULAR'PR£YENTER AND CLOSE PIPE RAMS. 7. INCREASE PRE$$URE TO 5000 PS1 AND HOLD FOR 10 MINUTES, 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRE~,~URE TO ZERO PSi TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO Ps1 'DOWNSTREAM. BLEED SYSTEM TO ZERO PS1. 9. OPEN PIPE RAMS. BACKOFF RUNNING,JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR I0 MINUTES, BLEED TO ZERO P $1. OPEN BLIND RAMS AND RECOVER TEST PLUG, MAKE SURE MANIFOLD AND LINES ARE FULL OF BRINE AND ALL VALVES ARE SET IN THE DRILLING POSITION. TEST STANDPIPE VALVES TO 5000 PSI, TEST KELLY C[X;K$ AND INSIDE BOP TO 5000 PS1 WITH KOOMEY PUMP. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM, SIGN AND SEND TO DRILLING SUPERVISOR, DM MARCH 9, 1987 . ' ' STATE OF ALASKA ~'% ALASKA O,~ AND GAS CONSERVATION CO; ..... ,ISSION WELL COMPLETION OR RECOMPLETIOit,' REPORT AND LOG 1. Status of Well Classification of Service Well OIL !~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Chevron U.S.A. Inc. 80-107 3. Address - 8. APl Number P.O. Box 107839~ Anchorage, Alaska 5o-133-10129-01 ,. 4. Location of well at surface 9. Unit or Lease Name 710'S & 660'W of NE Corner Section 9, TTN, R9W, S.B.&M. Soldotna Creek Unit At Top Producing Interval 10. Well Number 622'S & 712'W of NE Corner Section 9, TTN, RgW, S.B.&M. SCU 41A-9 At Total Depth 11. Field and Pool 614'$ & 706'W of NE Corner Section 9, TTN,. R9!!/, S.B.&M. Swanson River - 5. Elevation in feet (indicate KB, DF, etc. I I 6. Lease Designation and Serial No. Hemlock ...... G.L. = 135' K.B. = 150'] A-028997 12. Date SPudded . , 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 4-28-81'5'/£°1MI 5-24-81 8-30-85 NA feet MSLI 1 1-~. Total Depth (MD+TVD) 18. Plug Back Depth(MD+TVD) 19. Directional Survey 20. Depth where ~ssv set I 21. :Fhickness of Permafros~ 10,847'; 10,845' 10,799'; 10,797' YES [] NO ~ NA feet MDI NA 22. Type Electric or Other Logs Run NA , 23. CASING, LINER AND CEMENTING REcoRD 11-3/4" 47.5 K-55 SETT,NG DE1P~I~D , q_t,, 1200 sks "G" CASING SIZE' WT. PER FT. GRADE TOP 18' BOTTOm HdL"E2S~ZE CEMENTING RECORD AMOUNT PULLED 7,, 26 N-80 16, 1998, 15½" 1200 sks ,,O,, ,,. 7" 23 N-80 2994' 4967' 10'5/8" DV. ~ 7570': 1st 7" . . 26 . N.-80 4967' 6722' 10-5/8" 700 sks "O" ;. 2nd . _ 7" 29 N-80 6722' 10,847' 10-5/8" 900'sks "O" ._.5" 18 N-80 10,136' 10,847' 6" 68 sks "O" 24. Perforations open to Production (MD+TVD of Top and Bottom and 251 TUBING RECORD interval, size and number) " SIZE DEPTH SET (MD) PACKER Sl~T (MD) 10,752' MD- 10,740' MD 3½" 10,080' 10,071' ....... 10,750' TVD - 10,738' .TVD 2-7/8" 10,707'. . 26. ACID, FRACTURE, cEMENT SQUEEZE, ETC. 12'. 4 - ½" JSPF (48 total) DEPTH INTERVAL (MD) AMOUN;I' & KIND OF MA, TERIAL USED 10.758'-10.660' ... 150 sks "O" ....... . 27. PRODUCTION TEsT ,. Date First Production I Method of Operation (Flowing, gas lift, otc.) ,I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE' IGAS-OILRATIO .... TEST PERIOD * I · , _ , Flow Tubin. g Cas!ny Pressure . CALCULATED . OIL-BBL' GAS-MCF WATER-BBL' OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ ' .-, '28. 'NA....CORE 'D/~TA . Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED OCT 2 4 Alaska Oil & Gas Cons. C0rnmissior~ Anchorage ., , Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE }f~ ?.-i- ':' :; "-.-' '~ ' :"' ~i ",': ': : ' ~''' : ' ' " ..... GEOLOGIC MARKERS. ' 'FORMATION T~:STS " NA NA . NAME. Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. , 31. LIST OF ATTACHMENTS - 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ Title Area Engineer Date /d-)~/.~'~;~-~- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal; water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. .. Item 16 and 24: If this well is completed f~3~' separate production from more than one interval (multip!e completi°~:i, so state in item 16, and in item 24 show the producing ini'ervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multi'pie stage cement- lng and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON W'EL DRILLING WELL ~ COMPLETED WELL ~ ~ER 7. Permit No. 80-]07 ~e c~¢~, 2. Name of Operator Chevron U.S.A. Inc. 3. Address P.O. Box 107839, Anchorage, AK 99510 4. Location of Well at surface: 710'S & 660'W of NE Corner Section 9, T?N, Rgw, S.B.&M. At total depth: -:61'4~'S & 706'W of NE Corner Section 9, T7N, Rgw, S.B.&M. 5. Elevation in feet (indicate KB, DF, etc.) G.L. = 135' K.B. = 150' 12. I 6 . Lease Designation and Serial No. A-028997 8. APl Number 50- 133-10129-01 9, Unit or Lease Name Soldotna Creek Unit "' 10. Well Number SCU 41A-9 ~ 1 1. Field and Pool Swanson River Field - Hemlock Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing ~] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began operations at 7:00 pm 8/12/85. Killed well with 9.5 ppg fluid. Installed BPV, and nippled down tree. Nippled up BOPE and tested to 5000 psi. Tested annular to 2500 psi. Removed BPV. Released packer, and killed well. Pulled out of hole and layed down the tubing. Picked up and tripped in the hole with a 4-1/8" bit, 2-7/8" drill pipe and 3½" drill pipe. Cleaned out to PBTD of 10,795'. Tripped in the hole with an RBP set at 10,600'. Test liner, casing, and liner top to 2200 psi. Tripped in the hole with open ended drill pipe to 10,778'. Spotted 50 sack balanced plug. Hole took fluid. Pulled out of hole and drilled cement from 10,557'-10,700'. Tripped in the hole with open ended drill pipe to 10,687'. Spotted 100 sacks balanced plug. Pulled up to 9908' and reversed out excess cement. Squeezed perforations from 10,674'-10,660' with final pressure of 1500 psi. Tripped in the hole with a bit and cleaned out to 10,700'. Test to 1500 psi. Tripped in the hole with DST tools, and set packer at 10,612'. Rain wso test and indicated good squeeze. Drilled cement from 10,700'-10,792'. Ran tubing conveyed 3-3/8" guns,' packer and completion tubing. Ran a gamma ray correlation log, and spaced out the tubing. Nippled down the BOPE. and nippled up the tree. : Nut on the BPV fell down the hole. Nippled down the tree and nippled up the BOPE. Tested the BOPE. Pulled the tubing and recovered the nut. Reran the tubing conveyed guns and completion string. Nippled down the BOPE and nippled up the tree. Reversed the tubing with diesel and annulus with lease crude. Set the packer at 10,071' with 1200 psi. Tested the packer and annulus to 1000 psi. Perforated the interval 10,752'-10,740' with 3-3/8"--tubing conveyed guns 4 - ½" JSPF 90° phasing. Flowed well until clean-up. Operations complete at 12-00. pm ~/30/85. / ,r_/~/r~7~y t~/_~e,~...-- Title Area Engineer Signed The space below for Commission use Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE Of ALASKA '-" ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator Chevron U.S.A. Inc. 3. Address P.O. Box 107839, Anchorage, Alaska 99510 4. Location of Well 710' S & 660' W from the NE Cor., Section 9, T?N, R9W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 135' G.L. 6. Lease Designation and Serial No. A-028997 7. Permit No. 80-107 8. APl Number 50-- 133-10129-01 9. Unit or Lease Name Soldotna Creek 10. Well Number scu ql- 11. Field and Pool Swanson River Hemlock 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing I~ Other I~ Pulling Tubing {Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). SEE ATTACHED PROGRAM RECEIVED FEB 2 7 1985 Alaska 0il & Gas Cons. Conll]llSslon Anchorage Suhr~qae~t Work Reported This wo=k will begin on or about May 1, 1985 Signed . , Title Area Engineer The space below for Commission use Date Conditions of Approval, if any: Approved by ,ApProved Copy By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SCU 4 !~..9 Section ~'7N R9W S.B.&M. Swanson River, Alaska Page 3 Well: Field: ,, Location: Elevation: Present Status: PRO 316-1 PROPOSAL FOR WELL OPERATIONS SCU 41A-9 SCU 41A-9 Swanson River __ _ APPRbVED At surface: 710' South and 660' West from NE corner Section 9, TTN, Rgw, S.B.&M. At T.D.: 96.15'N and 45.88'W of surface location. 135' G.L. All measurements based on original KB of 1~'.~ ¢ T.D.: 10,847' Plugs: 10,795'-10,847' F £ B 2 ? 1985 Casing: 20" cemented at 28' 11 3/4" cemented at 1998' Alaska 0il & Gas Cons. C0mm~ 7" window at 10,340' to 10,384' Anchorage Liner: 5" 18# N-80 Buttress cemented at 10,845'. Top of liner at 10,136'. Perforations: 10,740'-10,752' (open) 10,660'-10,674', 10,722', 10,734', 10,759' (squeezed 4-82) . Tubing: See attached detail. Junk: none Note: The 5" liner has sand fill from +10,473' to 10,795'. It is believed that the fill consists of many sand bridges. Blowout Considerations 1) 2) 3) 4) Gas: This well has produced up to 8000 MCFD. Care must be exercised at all times not to swab well. Lost Circulation: None anticipated but lost circulation material should be kept on location ~t all times. Precautions: Any kicks should be handled by normal procedures. Rig crews should b~' made aware of these methods and care must be exercised at all times. The hole must be kept full at all times, Maximum Anticipat. ed Formation .Pressure: 4700 PSI Programed workover fluid weight of 8.9 to 9.5 lb/gal will provide an overbalance of 233 to 566 PSI. SCU 4~_~-9 Seetio~'-~'?TN R9W S.B.&M. Swanson River, Alaska Page 4 5) 6) Maximum Anticipated Surface Pressure: 3770 PSI Blowout Prevention Equipment: Class III - 5000 PSI ~.. N i ~egnarl --. __ SCU 4:'-~9 Se,riot, ~ T7N R9W S.B.M. Swanson River, Alaska Page 5 SCU 41A-9 WORKOVER PROGRAM - ~ppRO~/ED '~ PROG~ / ¢. N. . Prior to moving in workover rig, pull BK check valve from mandrel at 5417' and replace with an EK dummy valve. Pull EK dummy valve from mandrel at 10,017'. 2. Move in rig up workover rig. 3. Kill well using 9.5 lb/gal gelled mud as detailed in attached workover fluid program. 4. Install back Pressure valve and remove tree. 5. ' Install Class III BOPE and test to 5000 psi. Remove back pressure valve. ® . Release 7" 29# Baker "FH" packer. Recover 3~" tubing and associated production equipment, clean and test all gas lift mandrels. Install dummy valves in all mandrels. Redress packer. Install wear bushing. Clean out casing and liner to top of plug at 10,795'. Circulate well clean. Run in hole with open ended 3 1/2" X 2 7/8" drill pipe to 10,770'. Cement squeeze.~as follows: ~..%<'~) .~4~qualize 50 sacks of Class "G" cement with 1.25% CFR-2 or equivalent. ro~ a) Water requirement - 5.0 gal/SX Slurry weight - 15.8 lb/gal Slurry volume - 1.15 CF/SX b) Precede cement with 15 bbl of fresh water, follow with 5 bbl fresh water, Pull up to +9200'. Close annulus and down squeeze. Do not exceed 1500 psi surface pressure. ~ Displace maximum of 3 bbl. Hold squeeze for 30 minutes or until pressure bleeds off. Slowly pull out of hole. WOC for +18 hours. e Run in hole with bit and clean out cement to 10,700'. Pressure test casing to 1500 psi. POOH 10. Run in hole with 5" 18# retrievable packer and test valve and perform WSO test on perforations at 10,660-10,674'. a) b) e) d) Fill_+7500' of tubing with 9.5 lb/gal brine while running, leave remaining tubing dry. Set packer at 10,650'. Pressure test annulus to 1000 psi. Open test valve and observe flOwback to surface, if any. Resqueeze if no shutoff is obtained. 11. Run in hole with bit and clean out cement to 10,795'. Pressure test 7" and 5" casing to 1400 psi. Circulate well clean. 12. Run production string as per attached proposed tubing detail. SCU 4~-9 Sectio' ~TTN R9W S.B.&M. Swanson River, Alaska Page 6 13. Space out tubing such that perforating guns are across DIL interval 10,740- 10,752'. Depth critical, tie into depth using gamma-ray log. 14. Land tubing, install BPV and rig down BOPE. 15' Install production tree and test to 5000 psi. Remove BPV. 16. Displace well fluid with lease crude down annulus and up tubing until clean crude returns are obtained. 17. Set packer and pressure test annulus to insure packer is set. 18. Drop bar and fire tubing conveyed guns. 19. Place well on production for 24 hours and obtain gauge. (May be necessary to gas lift well.) 20. Pending satisfactory gauge, pressure up tubing and drop off perforating guns. Install BPV and move off rig. 21. Remove BPV and return well to production as directed by Area Foreman. Gauge frequently. JBL:mw J.B. Logan 8-14-84 'APP'I~OVED PROGRAM 0 ------- ~ 3628' * 4212 * .... ~ 4516 ' --------. * 5102' ~ 5416' ~ * 7770' ~ 3 I/2" CAMCO MANDREL W/ EK DUMMY VALVE IN PLACE 31/2" 9.3 # EUE 8rd N-80 TUBING *lO010'I 3¥2" CAMCO MANDREL W/ EK DUMMY VALVE IN PLACE *10080'--- 7" 2911 BAKER "FH" PACKER ~10090'"- 31/2" OTIS "S' NIPPLE, POSITION 4 10136'! TOP OF LINER 31/2" 9.3 # ASL N-80 TUBING , 10348'i TOP OF WINDOW "~: 10400'"'- X-OVER 27/8'' x 31/2.. ARMCO SEAL-LOR ' 257' 27/8" EUE 8rd N-80 TUBING ..... :t 10657'! 27/8" RADIOACTIVE COLLAR (C0-60) " 2 JTS 27/8" EUE 8rd N-80 TUBING ~J 0  107~§'P.B.T.D. 1084 5' T.D. I *10717'---- 27/8" HYDRAULIC GUN RELEASE W/ 2~8" 80X X PIN 27/8" ONE-_WAy FLOW VALVE _W/, 27/8" BOX X PIN ,,, X-OVER 2 F/B EUE BOX X 23/'8, EUE PIN ..... 16' 2 3/8" EUE 8rd N- 80 TUBING - 23/6" GUIDE SHOE · :5~8" FIRING HEAD W/ 23/8'' EUE 8rd PIN UP 10740' '~'~ 33/8" TUBING CONVEYED PERFORATING GUN W/ 12' -, 10752'J LOADED 4 JHPF ' NOTE: DEPTH CRITIC,4L "APP~6vED PROGRAM '~. N. ~eg'ha'r i __ _ SCU 41A - 9 PROPOSED TUBING DETAIL ! February 4, 19'83 Mr. T. L. ?erryman Area Operatfons Superintendent Chevron U.S.. A., Inc. P. O. Box 7-839 Anchorage, Alaska 99410 Dear Mr. Perryman :- The Alaska Oil a~d Gas Conservation Co~ission ha8 recently checked the records of wells completed since January 1, 1979. This review has revealed that the digitized data for certain logs run in a well is not on file with--the Commission. ~ The 0il and Gas Regulations require the operator to file, 'within' 30 days after completion, suspension, or abandonment of a drilling well, the digitized data, if available, for copying, for all logs run in-the well except velocity surveys, experimental logs and dip- meter surveys. We would request that you check your records to see if the data has been submitted to the Commission and, if not, that you comply with the regulation with regard to the following wells~ -." ; ' Swanson River Unit No. 31-33 WD Soldotna Creek Unit No. 44-8A Pretty Creek Unit No. 2. -Thank you for your cooperati.on in this matter. Soldotna Creek Unit Mo. 12-3A Soldotna Creek Unit No. 41-9A Yours very truly, Harry W. Kugler ~.Commissioner ', ' . BY ORDER OF THE .COMMISSION COMPLETION REPORT AREA: Swanson River Field LAND OFFICE: Anchorage PROPERTY: Soldotna Creek Unit ~.~:ASE NO: A-O2897 WELL NO: SCU 41-A9 API NO: 50-133-1 O1 29-01 LOCATION AT SURFACE: 710' S & 660' W. from the N.E. Cor., Sec., 9 T7N, R9W, S.M. LOCATION AT TOTAL DEPTH: ELEVATION: ] 50' K.B. DATE: 6/82 Same T. L. PERRYMAN AREA SUPERVISOR DRIT.T.MD BY: DATE COMMENCED REMEDIAL WORK: DATE COMPLETED REMEDIAL WORK: RETURNED TO PRODUCTION: Clanton Rig #1 3/14/82 4/29/82 4/29/82 TOTAL DZPT~: 1 0,847' SUMMARY, Perforations - 10,740'~]0,752 '% .% CASING: Log · 20" - =28' ll 3/4" - 1,998' 7"- 10,348' 5" - 10,845'-10,136' Gamma Ray-Collar Locator Log RE[EIVED J U L 1 i982 Alaska Oil & Gas Cons~ Commission Anchorage SCU 41A-9 3/14/82 Accepted Clanton's well service Rig #1. Began mixing brine water. 3/15/82 Mixed brine water. Rigged up. 3/16/82 Rigged up. Removed tree. Nippled up BOPE. 3/17/82 Killed well down 3-1/2" tubing with 9.5 p.p.g, brine water. Lost returns with 345 bbls. brine pumped (estimated 352 bbls. to circ. well) well on vacuum on both annulus and tubing. Pump 20 bbls. down annulus and observe well. Well dead. ND X-tree and remove .092 wire ball from donut. Back pressure valve threads washed out on donut. Screw in lifting sub into donut and put full opening sa~ valve on top. Strip BOPE over top of lifting sub. N. U. ~BOPE and modify sub to fit BOPE. 3/18/82 Continued to modify sub to fit BOPE (12 hours down time). Build and N. U. hydraulic lines to BOPE, Closed blind rams on 3-1/2" lift sub - collapsed tubing.. ChangedoUt lift sub. 3/19/82 Finish N. U. kill line. Tested BOPE--tested hydril to 2400 psi and all other valves and rams to 5,000 psi - could not test blind rams; all others tested. Release packer and POOH., pump 12 bbls. brine down annulus. POOH and lay dOWn 37 JTS. of 3-1/2" 9.3 NS0 - 8rd tubing. 3/20/82 Finish POOH and laying down 3-1/2" tubing (329 Jt. 3-1/2" 9.3 EUE 8rd (2 jts. were bad), tl Jts. 3-1/2" 8.2# Seal-lok, 8 mand. and 1 - 7" Baker FHL packer) total in hole. Pumped 5 to 10 bbls. of 9.5 p.p.g, brine in every 3-4 hours. 3/21/82 R. U. wire line rope spear and bumper sub and RIH on 25 Jts. of 2-7/8" PAC drill pipe, XO, and 198 Jts. of 3 1/2" 13.3# dp. Reduced brine wt. from 9.5 p.p.g, to 8.9 p.p~g. Pmp 5 - 10 bbls. brine every 5 to 6 hours. Hole on vac. 3/22/82 Continue P.U. and RIH with 3 1/2" dp. Rig down due to repairs 11-1/2 hours. t E£EiVE J U L l ]982 Oil & Gas Cons. Commission 3/23/82 Rig down 24 hours due to repairs. 3/24/82 Finish repairing brakes and clutch. Start P.U. and RIH with 3-1/2" dp. Tag fish (Fish: 6G00' of 0.092 solid wire line and 1'-1/2" b~e~and bumper sub.) at 10,525 push to 10,553'. Worked fish on to spear and POOH. Oil on dp. on 16th etd estimate fluid level at 1000 ft. - fish dragging 10M~ coming out of hole hung up at 7500 ft., worked D.P. up to 80#M over before coming loose - lost all drag. 3/25/82 POOH, drill pipe started pulling wet w/crude, N.U. circulating head and displaced oil out of drill pipe w/58 1/2 bbls. of 8.7 p.p.g, brine. POOH w/3 1/2" d.p. and 2-7/8" PAC drill pipe. Did not recover any of fish - pulled all barbs off spear. P.U. two forked wire line spear w/5- 7/8" od gage, jars and bumper sub and RIH on 3-1/2" dp. 3/26/82 POOH with drag. Recovered ball of wire wrapped around jar mandrel. Left 2 xo and w.1. spear in hole (see above fish) P.U. hook-lip xo sub. 3/27/82 RIH to 6934' - did not tag fish (Fish: 2 prong W.L. spear and 2 x.o.'s = 8.41'. 4 3/4" O.D. fishing neck, and 6000' of 0.092 wire line, bailer and oil jars). RIH tag fish at 7560'. POOH recovered all of 2 prong spear and 300' of 0.092" wire line P.U. 3 prong inside hook wireline spear (5 3/4" OD) and RIH 2 stds. Rig hydraulic pump down 6 hours. ,3/28/82 Down 2 1/2 hours on repairs. RIH with 3 prong W. L. spear (5 3/4" OD) Tag fish at 7560'. POOH recovered 8" of 0.092 WL2 PU & RIH w/ S.L. spear. RIH. Tag fish at 7560'. Pushed wire ball down hole to 5" liner top at 10,135' . Tagged liner. Bounced spear into wire ball. 3/29/82 POOH w/single pole outside hook wire line spear w/6" no-go stop ring. Re- covered 200' of 0.092" OD wire line. Layed down spear and picked up same type of spear with 3 7/8" no-go stop ring and RIH. Tagged ~olid fish at 10,127'. Worked spear into fish and POOH w/some drag. _ 3/30/82 POOH with wire line spear. Recovered est. 100' of broken W. 1. sp~_~. RIH. Tag fish at 10,135' SLM - worked into fish. POOH w/drag but drag 2/3 the way out of hole - recovered est...5~' of w.1. and lost barb in hole. Spear also bent. P.U. new spear w/stronger barbs aad ~ stronger center post. RIH with new spear. Total Brine pumped in 3/31/82 RIH w/new spear. Tagged fish (Fish: 0.092" wire line, 1 1/2" sand bailer, oil jar - 10,135' - 10,845'. ). Pooh w/ large amt of w.]. f~$h. 4/1/82 POOH with spear from 10,668' no recovery. Rigged to test BOPE - could not get test on pipe rams or bbN~ rams. No visible leaks of any kind. Reseated tubing hanger being used as test plug several times. Leak believed to be around hanger. Picked up cutlip shoe, overshot, and 60' - . of washpipe. RIH preparing to washover ..... · · 4/2/82 Mud pump leaking from fluid ends. Attempted to washover fish. Picked up high torque. Could not make any hole without torque. POOH no recovery Markings on overshot showed wire line on top. Picked up spear RIH. · .. 4/3/82 Worked 2" OD spear into fish. Pulled up to 140,000 lbs. before jars wen~ off. Lost drag. POOH. Appeared spear forced 6' pilot hole into fish. Picked up offset spear, RIH. Worked spear 4' into fish. Had 5000# drag coming off bottom. POOH. '- ..- . "~' Bailer. Depth: 10,654'. 4/4/82 POOH w/1 1/4" spear, no recovery. Believe casing may be damaged at 10,654'. Ran fishing assembly to determine size of casing RIH took weight at 10,654'. Tagged bottom at 10,664'. Attempted to mill deeper. Experienced high torque with 5,000 lbs. WOB. POOH to 4,500'. Shut r°iF down to chang? ou~ traveling block. Rig down 6 hours ...... · . 4/5/82 Rig down. Changing out traveling block. POOH w/2 5/8" tubing. End of tubing crushed and splintered to 1 1/2" OD. After rechecking 1 1/4" spear run previously found small marking believed to be end of rope socket. Picked up overshot and RIH. Picked up kelly at 10,649'. Pump pressure increased from 200 psi - 1000 psi at 10,652'. Pulled 45,000 lbs. over string weight before jars~'~ipped freeing fish. Worked fish into overshot. PO0~ w/15000 d~ag. :~ ' ~ . ~ -' · ~ ~ " ' - ~ ~ - '~ ~'~ knuckle jars, piston of oil jPOOH wet w/ I 1/2" overshot. ~ii~ii~reiiad~pli!!~rS!~.~i~!iillF01 i~ii!ek!ig~~!!!ii~~6~ body of oil jar, Sand Bailer. 1 of fish at 10,668' . Rotated increased 500 psi. Pulled 20,000 lbs. over weight of string befc~e fish came free. Dropped bar to open drain sub. Rotary drive housing ~amaged when rotary clutch engaged with locked table. POOH to 4,620' - d~ive chain on hydraulic system broke. No replacements on location down 4 hours. 4/7/82 Down total of oC. 1/2 hourS repairing chain drive on hydraulic system. POOH w/3 13/16" overshot w/1 3/4" grapple. Recovered oil jars, sand bailer. Total length 13'. · 4/8/82. Rig down tQtal of 8 hours waiting on replacement for right angle drive on rotary. Rigged up to test BOPE-~ested rams to 5,000 p.s.i.. RIH with 4" mill to 10,658'. Picked up kelly. Broke circ. took 1 hour to repair leak in swivel. 4/9/82 Began milling on bridge at 10,628'. With 2,000 lbs. WOB had high torque. Milled to 10,631. Large quantity of lost circ. material over shakers. At 10,631' broke through bridge. Circ. down to 10,654'. Down 2 hours repairing mud pump and hydraulic system drive chain. Circ. clean down to 10,787' (10,796' original rig depth). Pumped polymer pill to sweep hole. Made 5 etd short trip. POOH laid down mill and junk baskets. Serviced rig. Rigged up dresser atlas. Tested lub~cator to 500 p.s.i. RIH w/3 1/8" W.S.O. perf gun. 4/10/82 Dresser shot 4 1/2" holes at 10,758', 10,734' and 10,722' w/3 1/~" gun. Rigged down dresser. RIH open ended with 2 ~/8" dp and 3 1/2 dp to 10,780'. ~igged up to squeeze perfs as follows: pumped 15 bbls. fresh water ahead. Slurry - 50 sx class "G" s/5%KCL. 1.5% D-19, 4%D-6. Pumped 4 bbls. fresh 'water behind. 'Displaced w/69 bbls. salt water. Mixed to a density of 15.7 p.p.g. Top of cement 10,106' - POOH to 9,97~'. Closed hydril and squeezed 3 bbls. to a pressure of 500 psi. after 30 min. pressure bled to 150 p.s.i. Recovered 1/2 bbl. POOH picked up 3 ~1/8" bit RIH. 4/11/82 RIH w/bit #1 to top of cement plug at 10,515'. Drilled up cement from 10,515' to 10,549' R.O.P. 90 FPH w/6000 lbs. W.O.B. waited on cement. Drilled up cement from 10,549' to 10,611'. R.O.P. 90 FPH w/6000 lbs. W.O.B. waited on cement. Drilled up cement from 10,611' to 10,642'. R.O.P. 60 FP~ w/6000 lbs. W.O.B. Waited on ~cement. ._Drilled cement fr~m 10,642" to 10,700'. R.O.P. 60 FPH w/6000 lbs. W.O.B. tested perfs to 1500 p.s.i, pressure bled off 700 p.s.i, after 10 min. Drilled cement to 10,728'. Tested WSO perf$~ to 1300 p.s.i. Pressure bled to 800 p.s.i, after 10 min. Drilled cement to 10,750'. 4/12/82 Rig down 2 hours repairing mud pump. Drilled cement from 10,750' to 10,780. Circ. clean 1 hr. POOH RIH open ended to 10,780'. Rigged up to squeeze. pumped cement as follows: 15 bbls. fresh water ahead, slurry 50 sx c~[,~I, V E J U L 1 ]982 Oil & Gas Cons. Commi., 4/12/82 cont. w/2% D-19, 1% D-31, 5% KCL. 4 bbls. fresh water behind. Displaced 69 bbls. brine water at 3.5 bpm. 'POOH to 9,500'. Pumped 2 bbls. with no pressure buildup. 4/13/82 W.O.C. 2 1/2 hours. Tagged top of cement at 10,536'. POOH picked up bit no. 2 RIH to top of cement. Cleaned out. cement from 10,536' to 10,700'. R.O.P. 30 FPH w/6000 lbs. W.O.B. at 10,700'. Tested perfs to 1500 p.s.i, for 10 minutes. Cleaned out cement from 10,700' to 10,728'. Pressure tested perfs to 1400 p.s.i, for 10 min. Cleaned out cement from 10,728' to 10,740'. Pressure te-sted perfs to 1350 p.~s.i, for 10min. 4/14/82 Drilled out cement to 10,795' at R.O.P. of 30 FPH. At 10,795' pressure tested perfs to 1350 p.s.i.-held pressure. Circ. Clean. POOH laying down D.P. Rigged up to run 3 1/2" production tubing. 4/15/82 Ran 3 1/2" production tubing. Rigged up to reverse out brine and displace with tease crude. 4/16/82 Displace brine mudwith lease c~ude. Landed donut and attempted to set packer. (Pressured up to 1500 p.s.i, and then the shear sub sheared.) Tested packer and found it had not packed off completely. Attempted to work tubing but en- countered 20,000# over string wt. drag. Packer probably partially set but not completely packed off. RIH with position #,4 plug on. wire line to "s" nipple below packer. Set plug. Pressured up to 220~ p.s.i, to set packer POOH with plug and testedpacker to 500 p.s.i, for 20 min. and held ok. 4/17/82 Pressured up annulus against packer to~500 p.s.i. - ok. Ran gamma ray -collar locater log. and found tubing shoe at 10,977'. Pressured up annulus to 1500 p.s.i, for 15 min. - packer held ok. Set plug in donut, nippled down BOP's and installed tree. Rig released 4/29/82 RIH w/ 2.6" hollow carrier w/ 12 GM jumbo jet II charges and perforated _1.0~' -1 0,752 ' . E[EIVED J/JL 1 i982 Oil & Gas Oo~s. Commission Chevron '  CheVron U.SA. Inc: P. 0. Box 7-839, Anchorage, AK 99510 · Phone (907) 279-9666: T. L. Perryman Area Operations Superintendent Production Department -- July 6, 1982 WELLS SCU flfl-8A SWANSON RIVER FIELD~ ALASKA Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive ~Anchorage, Alaska 99501 Attention: Mr. Russ Douglas Gentlemen: Please refer to preViously submitted forms 10-403 for wells SCU flfl-8A and SCU 41-9A, copies attached.. The bridge plug installation on SCU 44-8A and both perforating operations will be performed through-tubing. A lubricator will be installed and tested to 3500 psig prior to each wireline run. We anticipate this work to begin approximately July 15, 1982. :MJA:,~j Very truly yours,, Attachments REr E!VED J U L - 9 i982 Alaska Oil & 6as Oons. Commission ,Anchorage -~-" STATE OF ALASKA ALASKA ~,L AND GAS CONSERVATION C(., ..,IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ,. OTHER [] 2, Name of Operator 7. Permit No. CHEVRON U.S.A. INC. 3. Address 8. APl Number P.O. Box 7-839, Anchorage, AK .99510 50-133-10129-01 4. Location of Well 710' S. and 660' W. from NE corner, Section 9, T. 7N, R 9W, SB & M. 5. Elevation in feet (indicate KB, DF, etc.) ']50' KB 12. 6. Lease Designation and Serial No. A-O28997 9. Unit or Lease Name Soldotna Creek 10. Well Number SCU-41-9A 11. Field and Pool Swanson River Field Hemlock Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ~ Alter Casing [] ~ Perforations [] Altering Casing r"l . stimulate [] Abandon [] Stimulation I"] Abandonment D Repair Well [] Change Plans [] Repairs Made [] Other D Pull Tubing [] Other [] Pulling Tubing I-] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed 0.perations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Chevron U.S.A., as Operator, proposes to perforate SCU 41-9A interval 10690' - 10711' w/ 4 SPF. EECEIVED J U L - 9 1982 Alaska 0il & Gas Cons. Commission Anchorage 14. I hereby ceqify th~ t~e f'oregoing is true and correct to the best of my knowledge. Tho space below ~or Commission use Title AREA OPERATIONS SUPT. Conditions of Approval, if any: Approved by ORIG~INA[. SIGNED BY LONNIE C. SMITH Approved Copy Returned By Order of . COMMISSIONER the Commission Form 10-403 Rev. 7-1 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ALASKA OIL AND CAS CONSERVATION COMMISSION June 17, 1982 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA 99501'--3192 TEL EPHONE (907) 279.,-1433 .Mr. T. L. Perryman Chevron USA, Inc. P.O. Box 7-839 Anchorage, Alaska~ 99510 Dear Mr. Perryman: We wish to thank you for the material forwarded to the Commission in response to our letter of April 21, 1982. However, all of the requested material was not received at that time or during the subsequent interval. Again we wish to bring to your attention that ~he following required material has not yet been received: We 11 Completion Date Missinq Material Beluga River U. #214-35 3/7/81 -Samples (dry ditch cuttings ) -Mud Log-Directional Survey-DST/Prod. Test Reports-Digitized E. Log Tape Soldotna Cr. U. #21'4A 3/7/81 -Certified Survey Plat -Digitized E. Log Tape Soldotna Cr. U. #42-5A .... S'oldotna Cr. U. #41-9A.. ....... S%~nson Riv. U. #31-33WD 10/5/81 6/2/81 5/29/81 -Digitized E. Log Tape -Digitized E. Log Tape -Inclination Survey -Digitized E. Log Tape Swanson Riv. U.. #3 2-33WD 5/29/81 -Well History -Certified Survey Plat -Inclination Survey -Digitized E. Log Tape Please submit the above material at your earliest convenience since you remain in violation of Title 20, Chapter 25 of the Alaska Administration Code. Very truly yours, Harry W. Kugler Commissioner HWK/WVA/g lh Chevron Chevron U.S.A. Inc. P.O. Box 7-839, Anchorage, AK 99510 · Phone (907) 279-9666 May 25, 1982 T. L. Perryman Area Operations Superintendent Production Department WELL COMPLETION INFORMATION ~State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. Kugler Dear Mr. Kugler: Enclosed is the material requested in your April 21st correspondence. Also' included with this transmittal is information on Soldotna Creek Unit well #323-4. Not ~re mechanical drawings for wells SCU 42-5A, SCU 44-8A and/scu41-9A.~ Our drafting department is presently overloaded. I wil~~hese~-------'"- drawings to you when they haVe been completed. Also missing are the requested samples and core chips from Beluga River Unit well #214-35. There were no core samples taken from this well. Should there, be any questions contact this office. Very truly yours, T. L. Perrym~ DMW: dmw Enclosure COMPLETION REPORT- N~I~ REDRILL · .. AREA: Swanson River Field-Kenai PROPERTY:' Soldotna Creek Unit WEU_ NO: SCU 41A-9 LAND OFFICE: Anchorage -LEASE NO: ADL 028997 API NO: 50-133-10129-01 LOCATION AT SURFACE: 710' South and 660I West from NE Corner Section 9 T.7N., R.9W. SM LOCATION. AT TOTAL DEPTH ELEVATION: 15o' K.B.-- DATE: 9/6/81 ... Same DRILLED BY: Brinkeroff Signal Inc. Rig 54 .. DATE CDMVIENCED REMEDIAL WORK: April 21, 1981 DATE COMPLETED REMEDIAL WORK: June 2, 1981 RETURNED TO PRODUCT!ON: ~ ~3RI Gl NAL DEPTH: 10,852' REDRI LL DEPTH.' 10',847' EFFECTIVE DEPTH: CASING: 20" cemented at 28I 11 3/4" cemented~.at 1,998' 7" window ~:~1'0,348' to 10,384 SLMVtARY .PLUGS: Si detrack O/H 10,760'- 10,849' 10,684' - 10,655' 10,655' - 10,422' 10,422' - 10,356' · Redri l l LINER: 5" cement at 10,845' Top liner at 10,136' S'.T.: 465' of 7" cement at 10,849' ~ ~l J --~ ~J · i~J~ ~ 't/Oil ~.-..k t ---- ,1~'~ "~' I. ~'~ ~ LOGS: DRESSER ATLAS DUAL INDUCTION LATERLOG: DIL WITH LINEAR CORRELATION: FORMATION DENS ITY LOG: COMPENSATED NEUTRON: 10,374' to lO,8~]~J" COMPENSATED NEUTRON MULTISPACE 1 O, 300 ' to 10,~7)''~ COMPENSATED DENSlLOG: COMPENSATED NEUTRON GAMMA RAY: 10,374 to COMPENSATED DESILOG-NEUTRON: .: . II lO,374 to 10,,~ ~UAL INDUCTION FOCUSED LOG: 10,340 to 10, DUAL DETECTOR NEUTRON LIFETIME LOG: 10,380 to lO,~.~.Dll'~ .. ACOUSTIC CEMENT BOND LOG VDL: :':- 10,011 to ~ " 10,.?,,~ .r . 41A-9 April 29, 1981- ~" Moving in Brinkerhoff Signal Inc. Rig 54. T.D. 10,852' PBD 10,760' · April 22, 23, 24, 25 & 26 Rigging up and completing pump lines, mud tanks, fuel tanks, etc. April 27, 1981 ¢ Raised derrick at 7:30 AM.' Water well was completed to 60I T.D. Raised wind walls and hook up stand pipe. April 28, 1981 , , Mix mud .and pressure tested choke manifold to 5,000 psi. 67 pcf mud April 29i 1981 Hook up Dowell lines on production tree to kill wel'l. Initial annulus pressure at 500 psi. Initial tubing pressure 2,280 psi. Bleed off annulus pressure in 5 minutes on ¼ chOke. Pumped down tubing with Dowell annulus 67 pcf mud to kill well thru hole at 10,360', was unable to open sleeve at 10,570'. Circulated out, bleeding casing pressure off. 67 pcf mud April 30, 1981 .o Reset donut and installed safety plug in 2 7/8" t. ubing. Removed X-mas tree and prepa~-~d Class Ill B.O.P.E. 67 pcf mud May 1, 1981 Hooked up and pressure tested B.O.P.E. to 5,000 psi as per spec D-17. :Test waived by AO & GCC, approved;by USGS witnessed. Hydril pressured to 3,500' psi. Approved by USGS. Removed safety plug from donut. Rigged up to pull 2 7/8" production tubing, pulled free with three packers, 10,404'-10,513' and 10,580' could not free packer at 10,648'. Tubing hung up, making 110 turns into tubing and working pipe to 70,000/t over s._.~-.ing, string would not come free. Rigged up 'Go wireline and ran into hole with?Dialog free'point indicator. Indicator showed string was completely stuck at 10,513'. Packer pulled free at 10,404'. Pulled out of hole. Circulating out gassy mud. 67 pcf mud. May 2, 1981 Continued to circulat.~_out gassy mud, pulling out.. Made up GO wireline 8" chemical cutter, cut~?~?~7/8'' tubing at 10,453' pulled tubing, leaving 2 packers and tubing in the hole, top at 10,453' bottom at 10,691'. - 66 pcf mud May 3, 1981 Changed pipe-rams from 2 7/8" to 3 1/2II and tested to 5,000 psi. Made up TRI-STATE fish tools with 6 1/2" Bowen overshot and 2 7/8" grapple with mil control, bumper sub, jars, 10-4 3/4" drill collars. Prepared to enter hole. 66 pcf mud May 4, 198!. Ran into hole with 3 1/2" drill pipe and fish tools. Engaged fish at 10,367" and pulled 75,000# over tubing string, circulated out gas cut mud and found hole taking on fluid. Pulled out of hole-with 10 stands of fish and attempted filling hole with mud. Unable to-fill hole with mud gompleted filling with water. Recovered 195' ~)f fish including one Brown HS-16-1 packer, one Baker "FH" packer and miscellaneous jewelry down to and including Baker Stop subs and sealing assembly. Left one joint of tubing below wireline and packer set at 10,648'. Filled hole with approximately 95 bbls. of water, pulled up. Prepared TRI-STATE fi~sh tools to recover wi reline at 10,648'. 66 pcf mud .. May 5, 1981 Ran into hole with TRI-STATE fis'h assembly, encountered obstruction at 10,395. Circulated and cleaned out to 10,4OO' could not work further. Circulated mud to 66 pcf and pulled out of hole. Made up bit #1 a'nd ream 10,400' to 10,415'. Wash down top of fish at 10,560, circulated and pulled out. · 66 pcf mud May 6, 1981 Made up fishing tools, ran in and engaged fish at 10,651' 'and milled on same. Measured while pulling out fish tools but did not recover packer. Ran into hole and drilled up Model "F" packer;..one joint of 2 7/8" tubing with slotted plug on top of~riginal fish at 10,709.'. .Pushed junk to 10,687', was unable to push junk below 10,687'. - 66 pcf mud May 7, 1981 Pulled out of the hole and made up Dresser.Atlas and lubucator. Reentered the hole recorded Compensated Neutron MultisP~ce Log from 10,300' to 10,687' pulled Dresser Atlas. Ran..into hole with open end 3 1/2" drill pipe to 10,685' circulated tagging fish at 10,684'. With BJ Hughes plugged 7" casing from 10,684' to 10,384'. PumPed in 55~acks of class "G" cement with 3%' R-5 mixed "118 pcf. Pumped in 20 bbls. of W~ter ahead oi~ cement and displaced with 6 bbls. of water and-'70 bbls. of mud. Final displacement measured 475 psi. Pulled to 10,249' and circulated hole clean, pulled out. 66 pcf mud May 8,-'1981 B. J. Hughes plugged 7" casing from 10,65.5' t''° 10,355'. Pumped in 55 sacks of Class "G" cement with 3% R-5 mixed to 118 pcf'~. Pumped 20 bbls. of water, ahead of cement with 6 bbls. water and 70 bbls mud.- Pulled to 10,221', closed Hydril Bag and down squeezed 100' of mud leaving top of cement at 10,403'. Pulled to 9,729' and circulated hole clean, pulling out. · 66-pcf mud May 9, 1981 Ran into hole and tagged plug at 10,422'. Pulled to 10,412' and circulated hole clean, some cement showed in returns. ~c0ntinued circulation and condition mud at 10,381' - circulated. P.lug job was ~pproved by USGS with Oil and Gas Conservation waived. Pulled to 10,392' condition mud to 79 pcf for milling window. Pressure tested 7" casing to 2,500 psi for 30 minutes - test OK. Pulled out of hole with 3 1/2" open end drill pipe. Prepared Servco tools for milling. ' 78 pcf mud May 10, ]981 · Ran into hole with milling tools, milled 7" casing from 10,340' to 10,348' circulated, pulled out of hole and repairedmilling section for #2 assembly. Ran into hole. 78 pcf mud May 11, 1981 Milled on 7" casing from 10 348' to 10,365I, could not get below 10,365' pulled out of hole. ~'- 79 pcf mud , May 12, 1981 Made up 6~bit ran in and pushed junk to 10,'419'. Circulated and pulled out. Unplugged flowline ~nd made up #'3 Servco mill, trip back into hole and milled from 10,365' to 10,375'. 79 pcf mud .May 13, 1981 Continued milling to 10,380' working piPe-and circulating to clean hole. Continued milling to 10,384'. Total milled window 44'. With 3 1/2" drill pipe on bottom stabilized mud to prepare for cement plug. 80 pcf mud May 14, 1981 __ Using 40 sacks Class "G" cement with R-5, D-6 and D-31 additives squeezed at 1,500 psi set plug. Tested to 3,000 psi with BS Services equipment locating plug from 10,"422' to 10,220' final tag found top of plug at 10,310', reversed out. 80 pcf mud ..~?-_-..- May 15, 1981 Trip in with ~3 1/2" drill pipe to tag plug' #2:; was unable to locate top of plug. Circulated and conditioned mud Pulling back to:9,393', pulled 4 stands and reversed out 80 pcf mud · May 16, 1981 .. With B. J. Services, spotted 100 sacks of Class "G" cement with D-31, 15R, D-6 plugged from 10,356' to 9,883', reversed line to 9,619' pulling 7 stands. -~- 80 pcf mud ,, May 17, 1981 · Washed over cement and trip in locating top soft cement at 9,916' circulated out. Reentered hole waShing and drilling cement to 9,'960'. ~ .80 pcf mud May 1 8,' ~81 .. Circulated and washed over cemen_t drilling hard cement from 9,960' to 10,184'. Pulled out of hole. Tested B.O.P.E. to 5,000 psi, test held. Tested Hydril at 2,500 psi, test'OK. Trip back into hole and drille, d hard cement from 10,184' to '10,197' · ~ 79 pcf mud · May 19, 1981 Continued drilling from lO,197r'to 10,344' ~irculated and pulled out of hole. Made up 6" bit, 5" Dyna-dril,' assemblY.(580·'). Ran.into.hole With Dyna-dril #1 and drilled from 10,3441 to 10,346'. 10.7 pcf mud '~i~ .' · May 20, 1.981 .. Drilled from 10,346' to 10,354' at which point Dyna-dril became plugged. Work loose and pulled out. Ran in wit,h'Dyna-drill #2 circulating when tool became plugged~' ..... Pul led ten stands and reversed'cirCulation freeing' plugged pipe, pulled out. Ran in and drilled off cement:plug at 10,354' to '10,397' redrill hole. -- ' .... .. .10 pcf mud May 21, 1981 ~.~ Pulled out of hole_~-changed bit, ran into hole and reamed from 10,344' to 10,40.0' circulating. Continued drilling to.10,509'. Pulled and prepared for survey. ~.:' .80 pcf mud .. May 22, 1981 .,.. ._ , Replaced bit, reentere_d h°le and drilled to 10,612' circulated out. Dropped survey while going b~k"=into hole at 10,492. Pulled out having retrieved survey tools. 80 pcf mud May 23, 1981 Replaced bit, ran into hole and reamed from 10,585' to 10 633' , , circulated. ~i~'~,-Attempted survey and drop same, retrieved and pulled out of hole with survey. 'Repaired weight indicator, ran into hole with bit #8 and drilled to. 10,793'. 81 pcf mud May 24, 1981 _ Continued drilling to 1-~O,847', circulated. Pulled out and prepared to run Dresser Atlas logs. 81 pcf mud May 25, 198~1 With total depth set at 10,847', ran in with Dresser Atlas logging equipment. Ran Dual Induction Focused 'log from 10,340' to 10,847', compensated Densilog- Neutron from 10,347' to 10,~338' compensated Densilog from 10,347' to 10,838' , ' compensated Neutron Gamma Ray 10,374'-10,838' and compensated Neutron from 10,374' to 10,838' pulled logging equipment. Ran into hole plugging bit, pulled to unplug. 82 pcf mud May 26, 1981 _.~ · Reentered hole, reamed and wash from 10,727' to 10,847' circulated out. Prepared to run 5" liner. .~ 81 pcf mud M~ay 27, 1981 ,, Made up Baker hanger and ran into hole with 5" #18 butt thread N-80 liner, was unable to.work past 10,384' (window 10,340' to 10,384'). Pulled 5" liner out, made up 6" Tri-State taper mill assembly (1.75'). Ran back into hole and · . worked through 10,360' to 10,4OO' hole became tight at 10,638' but was able to ream through. Cleaned out fill from 10,837' to 10,847' circulated and condition mud. Pulled 5" liner where float shoe showed signs of having set down on casing cement, as guide was completely gone. 81 pcf mud May 28, 1981 = .. Made ran into hole to 7" casing shoe at 10,384' with 6" taper mill, pulled to run 5" liner. Made up Triple D tongs, ran in with 17 joints (709') of 5" #18 'N-80 butt thread liner, hung at 10,845', top at 10,136' Fit.ted top on Burns hanger and cemented welded guide shoe at 10,845' with 6~ sacks of Class "G" cement with 75% D-31, 2% R-5, 2% D-6 mixed to an average of 126 pcf top cement at 10,800'. Continued cement job with 10 barrels water and displaced with 5 barrels water 81 barrels of mud. Float held OK with good circulation throughout job. Pulled to 9,978' and reversed circulation and found no cement in returns. Pulled out of hole made up 7" casing scraper"~i~d reentered h~__le, tag cement at 10,035'. .. 81 pcf mud May 29, 1981 .. Washed over cement at 10,035', pulled back up ~hole to 9,978' reversed circulation and clean out drill pipe, found no cement. Pulled out and made up 4 1/8" bit, reentered and drill out hard c~r~ent from 10,612' to 10,799' circulated. May 30, 1981 Continued circulation ~ 10,797' and pulled out of hole. Prepared lap test for 7" and 5" lap with pressure at 2,500 psi held for 15 minutes, test OK. Pulled out and made Dresser Atlas recording equipment. Ran in and recorded cement bond log from 10,011' to 10,799' and Dual Detector Neutron Lifetime log from 10,380' to 10,791'. Removed Dresser Atlas equipment. 10 pcf mud _May 31, 1981 With B. J. Hughes pumping 200 barrels of water down annul lus, followed by 510 barrels of crude, had clean OrL returns. Pulled and laid down 3 1/2" drill pipe. Made up production string. 3 1/2" Armco 9.3// EUE 8rd N-80 with seal-lok tubing. ,. · _June I, 1981 Ran in with 3 1/2" EUE 8rd 9.3// p~.r_oduction string testing to 5,000 psi. Production string tail landed at 10,409' (see attached tubing detail). .June 2, 1981 With 5'l liner at 10,845' top at 10 136' , , , 3 1/2" tubing testing complete, (tubing tested to 2,000 psi, annulus to 1,O00 psi) removed B.O.P.E. and cleaned up well site. Released rig at noon. .. June 3, 1981 Rigging down. " _. .June 4, 1981 Rig was moved to SCU 21A-4 location. -, J. W. WILSON 'JWW:mn ~(.,u. 4t- 9A i .... -. buAL. O~r~:c 5"-.~o- 8i 5-30-~1 ~r J~a n s ~ ; l~ a l f~ STATE OF ALASKA ALASKA C.,,,. AND GAS CONSERVATION CO,,,,~llSSION SUNDRY NOTIC N R E ES A D ,EPORTS ON W LLS DRILLING WELL [] COMPLETED WELL I~ 2. Name of Operator Chevron U.S.A. Inc. 3. Address P. 0. Box 7-839, Anchorage, Alaska 99510 4. Location of Well 710' S & 660' Id from 'lq.[. Cor., Sec. 9, T7lq, 5. Elevation in feet (indicate KB, DF, etc.) 150' K.B. I 6 . Lease I~esianation A-028997 R9W, S.M. and Serial No. 7. Permit No. 80-107 8. APl Number 50-133-10129-01 9. Unit or Lease Name Sol dot. na Creek 10. Well Number SCU 41A-9 11. Field and Pool Swanson River Field Hem Iock 12. (Submit in Triplicate) Perforate [] Alter Casing [] t Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) IX1 Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). . . 3. 4. 5. . 7. 8. 9. 10. ll. Moved in Rig. Killed well with 70 PCF NACL water. Removed tree. Instal led and tested Class Ill BOPE. Released Packer and pulled 3 1/2'l production tubing. Recovered wirel ine fish. Cleaned out fill to 10,787. Perfed 4-1/2" HPF @ 10758', 10734' and 10,722'. Laid 50SX Class 'll~" CMT (15.7PPg) plug thru open end D.P. @ 10780. P.O.H. to 9500 down squeezed the above perforation as well as the existing perforations- @ 10660-10674. Cleaned out CMT from 10,536' to 10,795'. Ran. 3 1/2" production tubing with shoe at 10497'. Set packer, installed B.P,. valve, N.D. BOPE, installed and tested tree. Released Rig. Perforated ~'h'iT~-5'~bir~g'--~ ._ .}_O ~' ~ ---S 10752' Returned well to production. RECEIVED MAY 4 1982 A .... ka 0ii & Gas Cons. Commission Anchorage Signe~dF~~I. ~ ~/_7'~_~~/~~_~_~,,%--~e Area Operations Superintendent)ate The space below for Commission u~e Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date__ Form 10-403 Rev. 7-1-80 Submit "1 ntentions" in Triplicate and "Subsequent Reports" in Duplicate :~ - ,.~, STATE OF ALASKA ~ ALASK/~ii~ AND GAS CONSERVATION C,. ~4MISSION MONTHLY RBPORT OF DRILLING AND WORKOVER OPEFLATIONS / 1. Drilling well [] Workover operation [] 2. Name of operator 7. Permit No. CHEVRON U.S.A. INC. 80-107 . 3. Address 8. APl Number P.O. :Box 7-839, Anchor, age, _A~ 99510 50-133-10129-01 4. Location of Well at surface 710'S & 660'W of the N.E. cor., Sec. 9, T7N,R9W,S.M. 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 150' K.B. A-02899 7 9. Unit or Lease Name Soldotna Creek Unit 10. Well No. 11, Field and Pool Swanson River Hemlock For the Month of April 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Recovered W. L. Fish, cleaned out fill to 10,787'. Peforated 4-1/2" H.P.F. at 10,758', 10,734' and 10,722'. Squeezed perfOrations through open ended D.P. at ~i~' with 50 ax. class "G" cmt. Cleaned out cmt. from 10,536'-10,795'. Tested perforations to 1500 p.s.i, landed 3-1/2" production tubing a~lD~,?7~'~ 13. Casing or liner run and quantities of cement, results.of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run 1G. DST data, per{orating data, shows of Ft2S, miscellaneous data 4-1/2" H.P.F. 10,758', 10,734, 10,722!. t!aska 0il & Gas Cons, Comrnis,~i 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. S~GNE Area Operations Supt. DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate With the AlaSka Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed, Form 10~,04 Submit in duplicate ~ U.S.A. Inc. P. O. Box 7-839 Anchorage, Alaska 99510 April 21, 1982 following C~ron ~lls has Pz)t ~t been reoei~! by the Alaska Oil . ~letio~ Date Beluga River Unit #214-35 (2nd notice~ see a~ copy of 10/8/81 letter) -Cer,.-!~ied Survey Plat -D~unal ~ -DST or Prod. Test Reports -Digit/zed E. Log .Tape Soldotna Ct. Unit %21-4A 3/7/81 ~ell H~tory -Cert~fied Survey Plat -Digitized E. Log Tape Soldotna Ct. Unit #42-5A . lO/S/81 -Eke. L~ -DigitiT~d E. Log Tape Soldotna Ct. unit #44-8A . ~ell History ~ell History -Elec. Logs -Digitized E. Log Tape Swanson Ri~r b~t #31-33WD -Inclinatic~ Survey -Digitized E. Log Tape Swanson River Unit 932-337~ 5/29/81 ~ertified Sunny Plat -Inclinatic~ Summy -Digitized E..Log Tape Please ~t the above material at 2Lxlr earliest ccn~~ sinoe you are now in violati~ of Title 20, .~ 25 of the Alaska Admin/strative Code. Very truly yours, / BY oROE~ OF THE COM~JlSSION ~ STATE (Jr: ALASKA ALASKA ¢i_ ~ AND GAS CONSERVATION CO~ AISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [] '~ ' Workover operation [~ · 2. Name of operator -~ 7. Permit No. Chevron U.S.A. Inc. 80-107 3. Address -~ 8. APl Number P.O. Box 7-839, Anchorage, AK 'L 5o-133-10129-01 4. Location of Well at surface 710' S and 660' W from N.E. Corner, Section 9, T7N, R9W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 150' K.B. A-028997 9. Unit or Lease Name Soldotna Creek 10. Well No. SCU 41-A9 11. Field and Pool Swanson River Hemlock For the Month of. March ,1982 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Commenced operation 3/14/82. Kill well with 9.5 p.p.g. Brine Water. Remove Tree. Install and test Class III 5000 p.s./:Bope. Release Packer. POOH with 3 1/2" Production tubing. RIH with spear on 3 1/2" D. P. and screwed into 6000' of wireline, Bailer and Bumper Sub at' 10,553'. POOH with drag did not recover fish. RIH with two forked W.L. spear on 3 1/2" D.P. and tagged fish at 7560'. POOH with drag. Left two X.O's and W.L. spear in hole. RIH - recovered W.L. spear and 200' of W.L. fish. RIH with 3 prong W.L. spear. To 7560'. POOH with 8" of W.L. RIH with spear to 10,135'. Recovered 200' of W.L. RIH with spear to 10,135'. Recovered 100' of W.L. RIH with spear to 10,135' and recovered 50' of W.L. RIH with spear to 10,135' and recovered + 1000' of W.L. fishing for W.L. at month's end. 14. Coring resume and brief description 15. Logs run and depth where run .16. DST data, perforating data, shows of H2S, miscellaneous data 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. RECEIVEI) APR 1 5 1982 Alaska Oil & Gas Cons. Commis~ioi~ NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with 'the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate STATE OF ALASKA ALASKA ~-'AND GAS CONSERVATION CO:~ISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [] Workover operation 2. Name of operator 7. Permit No. Chevron U.S.A. Inc. 80-107 3. Address P.O. BOX 7-839, Anchorage, AK 4. Location of Well at surface 710' S and 660' W from N.E. COrner, Section 9, T7N, R9W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 150' K.B. A-028997 8. APl Number 50-- 133-10129-01 9. Unit or Lease Name Soldotna Creek 10. Well No. SCU 41-A9 11, Field and Pool Swanson Ri vet Hemlock For the Month of. March ,19 82 '12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Commenced operation 3/14/82. Kill well with 9.5 p.p.g. Brine Water. Remove Tree. Install and test Class III 5000 p.s./:Bope. Release Packer. POOH with 3 1/2" Production tubing. RIH with spear on 3 1/2" D. P. and screwed into 6000' of wireline Bailer and Bumper Sub at 10,553'. POOH with drag did not recover fish. RIH with two forked W.L. spear on 3 1/2" D.P. and tagged fish at 7560'. POOH with drag. Left two X.O's and W.L. spear in hol.e. RIH - recovered W.L. smear and 200' of W.L. fish. RIH wi th 3 prong W.L. spear. To 7560'. POOH wi th 8" of W.L. RIH wi th spear to 10,135'. Recovered 200' of W.L. RIH with spear to 10,135'. Recovered 100' of W.L. RIH with spear to 10,135' and recovered 50' of W.L. RIH with spear to 10,135' and recovered +_ 1000' of W.L. fishing for W.L. at month's end. 14. Coring resume and brief description 15. Logs run and depth where run 716. DST data, perforating data, shows of H2S, miscellaneous data RECEIV [ APR 1 5 1982 ~.--~ O|i & Gas Cons, Cornmissiui~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. : ....... ~ch0rage NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unles's otherwise directed. Form 10~,04 - Submit in duplicate ~ STATE OF ALASKA " aLASk~-'~,, L AND GAS CONSERVATION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL~I[~ OTHER [] · , Fy. Permit No. Chevron U.S.A. Inc. · / 80-107 '' I 8. APl Number P. O. Box 7-839, Anchorage, AK 99510 150-133-10129-01 Well ~' . ' 19. Unit or Lease Name 710' South and 660' .Wes. t from NE corner, Section I 10. Well Number_---- 9, T7N., R9W, SB&M. ~9A · ' ' "' ' I 11. Field and Pool ~ ---- I , DF, et .) I 6. Lease Designation and Serial No. I Swanson Ricer Field IA-028997 I Hemlock Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 2. Name of Operator 3. Address 4. Location of Well 5. Elevation in feet (indicate KB, DF, etc.) 150' KB 12. NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] ~ Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] - Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Chevron proposes to squeeze off existing perforations (10,660' - 10,674'), clean out fill and junk and perforate from 10,740' to 10,752' for completion in Hemlock 8 sand. Anchorage 14. I hereby certi~~ is true and correct to the best of my knowledge. Sign ' J, ~ .,/ Title Area Operations Sup~rinY_~nd~_nt Date · The space below for Commission use Conditions of Approval, if any: Approved :opy i~eturnecl 0~i~ ~i~L SIGN[I} ' ~ -~-0c'~ BY LGNNIE ~. SglTH B~ Order of Approved by. ' COmmISSIOnER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ~ STATE OF ALASKA ALASKA L,,~ AND GAS CONSERVATION CO...,~ISSION SUNDRY NOTICES AND REPORTS ON WI=LL$ 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 3. Address CHEVRON U. S. A. INC. P. O. BOX 7-839, Anchorage, AK 99510 4. Location of Well 710' S. and 660' W. from NE Corner, Section 9, T7n, R9W, SB&M. 5. Elevation in feet (indicate KB, DF, etc.) 150 ' KB J 6. Lease Designation and Serial No. . A-028997 12. 7. Permit Nq~0_107 8. APt~_~e6129_01 50- e. Un~dL~D~m(~REEK U~IT 11. Field and Pool SWANSON RIVER FIELD HEMLOCK Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] ~ Perforations [~ Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly State all pertinent details and give pertinent dates, including estimated date of starting any propoSed work, for Abandonment see 20 AAC 25.105-170). On 6/10/81 Chevron U.S.A. perforated SCU 41-9A from 10,660' to 10,674' with'4 s.p.f. 14.1 hereby certify,~ the ~/q~oing is true and correct ,o the best of my knowledge. Signe .. ~Z-~. ~---' Title A_P~A OP~,~TIONS SU~T The space below for Commission u~ RECEIVED: DEC-2198~ A~as~(a 0ii & Gas Cons. COiTiiTi[$$[O~ Anchorage Conditions of Approval, if any: Date By Order of Approved by. COMMISSIONER the Commission Form 10-403 Date Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE OF ALASKA 1. Status of Well . . Classification of Service Well SIDETRACK OIL'FI GAS [] SUSPENDED [] . ABANDONED Fl SERVICE [] Pf~]~T~i'TT~]~T¢PTAT ... 2. Name of Operator 7. Permit Number CHEVRON O.S.A. INC. mn_l n7 3. Address 8. A-P~' NJn~l~er P 0 BOX 7-839 ANCHORAGE ALASKA 99510 50- 133-]012q-01 4. Location of well at surface 9. Unit or Lease Name 710'S and 660' w From NE Corner Sec. 9, T7N, R9W, SB & M Soldotna Creek Unit At Top Producing Interval 10. Well Number same SCO 41-9A At Total DePth 11. Field and Pool same Swanson River Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 150 '. KB A-028997 Hemlock 12. Date Spudded~/~,(~ ~,~ 13. Date T.D. Reached5_24_81 14. Date Comp., Susp. or Aband.6_2_81 115' water Depth' if °ffsh°re feet MSL 116' N°' °f C°mpleti°nsNOne ~)',~/47T-°ta'L ~epth_[. 10,845 ' (_$ D+TVD! 10,799'18' Plug Back Depth_[. 10,797'(MD+TVD) YES ~'19' Directional SurveYNo~_~II 20. Depth where feet MDSSSV set 21.NoneThickness of Permafrost 22. Type Electric or Other Logs Run DIL ~ CDN, CBL, CL, NL, GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP, . . BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 1 ] q/A A7 5 .m,rfmrm 1 qqR' 1 52" 1 ?O0 .RW "C" 7" ?':1 ?R~?Q " ll3RA.-~' 10 ~/'R"i 250'0 .qx "~" R" 1R M--R~ I~I.RA' 1'~R45' 6"' '68 SX "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and ' 25. TUBING RECORD . interval,size and number) SIZE DEPTH SET (MD) PACKER SET (MD) ~" 10409.19 ' 10081.33 ' None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. - , - DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 1.065_5'-10355' iOC~ CI~.~ "G" CMT. .... ': . :' , '10412' 10220.'' ~ ~o "n" ~x~ · 27. PRODUCTION TEST' Date::Fir~t Pro. duc.tion,~ ,.... ,[ Method of Operati.on (Flowing, gas lift, etc.) None[ ..' DateofTest Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO ~ :'.'.;~ . !., . .- : TESTP, ERI.OD~ - , , - .,:..-. Flow:Tubing, Casing. Pressure.. 24.HOuRCALCULATEDRATE 'l~.~ OIL-BBL... . GAS-MCF, WATER-BBL OIL GRAVITY-APl (corr) Press. ,., , _ .. . ~: · 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .. -' ' ..... "" ' : RECEIVED - .- .- .... . ' --i.- .., ...,. - , JUN161981 : ,. Alaska 011 & Gas Cons. Commissio. Anchorage ALASI~_ . ,~..AND,GAS CONSERVATION C~ 211SSION COMmmT,O-# OR RmCOM LmT,ON'Rm ORT AmD bOU' W Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE . · : :~.:?;!--:.:-.:.?.~ .½:~i~.%E~)L~i~.:M~':~':~:S;::'.]L.":~;~t':':":~ .... :-:';:.~.-~.':';'~.;;, :.. -:?.., ..,. ...... . ;~:<.:";-.. ......... FORMATION; ;~ . .:,. TESTS' , , · NAME . . Include interval tested, pressure data, all fluids recovered and g~avity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. · . . . . 31. LIST OF ATTACHMENTS 32. I hereby certify that ~ ~r~oing is true and correct to the best of my knowledge Signed ~: T~ P~A~ Title A~n '~_ ~. Date. . INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. item 16 and 24: If this well is comp!?r..ted for separate production from more than one interval ~'mult~ple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". REPORT OF SUB-SURFACE O~RECTIONAL SURVEY CHLVR - N USA CL,~,PANY SLU..4 ] - 9-A WELL NA~E SWANSON RIVER, ALASKA LO~i-%TION AL 581 D! l .~.~..~,ER Sinole Shot 6/ll/R1 ... .~. · -, - -, - _ TYPE SURVEY DATE DON BURGESS NAME En~inee,r TITLE . .SIGNATURE : , 100- 10847 DEPTH INTERNAL FROM TO 5-14-81 5-25-81 DATES SURVEY WAS TAKEN FROM TO THIS ~S A RECORD OF A SUB-SURFACE SURVEY ~'r YOUR WELL We have retained a copy of your survey report in our files for your convenience; however, should you so desire, al! copies of the survey report will be forwarded to you on written request. All surveys are kept in a locked file' and are held in strictest' confidence. Additional copies of your survey report can be made from the origina! by any blueprint company. RECEIVED JUN 1 6 1981 Oil & Gas Cons. Commission COMPLETION REPORT FOR GLDD BY FM LINDSEY ASSOC, CHEVRON U S A ' WELL~i:JS.C,U, 41-9-A 'Cb'~'P-U-T'E'~C""~iETHOD{ RADIUS OF'"'¢'OR'gATU'~E) .......... CO~4'PUTE'R'""DATE ( 6~ 5-8 i ) FIELD METHODIAVERAGE) SURVEY DATEI1975/5-1~-81) GYROSCOPIC/SINGLE SHOT SURVEY RECORD OF SURVEY MEAS, DRIFT VERTICAL SUB 'ii! DRIFT .... TOIAL..COORDINATES DEPTR--ANG'Ii E ........... DEP TH ................... S E A-- ' D I'R E'C D H DEG. 'U---0 ...... O ...................... O;00 ........ ~15 0'00 W 100. 00.50 2 78, 200 0 0 200.00 50.00 N O.OOW 0.00 5 0,00 W 300 0 15 299.99 1~+9.99 N25.00W 0.21 N 0.0/+ W ~'OO- -0-'-30 ..... 399 ~ 99 .......... 2'4;9'-;~'99~'N2'9%;O'0W"~O'~79'-'N ............. 0 · 34 W 500 0 30 499.99 34,9,99 N59,00W ':../i,4.1 N 0.94 W 600 0 25 599,99 449,99': N55~OOW N 1.62 W ...... 700 0-15 699~98 ..... 5~.9'~98 NIS;.'OOW .... 2'"33"""N -- 1,95 W 800 0 20 799.98 649.98 N 9.00W 2,83 N 2,06 W 90{) 0 30 899.98 749.98 N25.00W 3.53 N 2.27 W --IUOU---O'-'30 ........... 999' 98 ....... 849~'98-C-Nl'7-~00WT'-~-"i"iZF;3~-'N-''-~ ....... 2 · 59 W 1100 0 30 1099,97 949.,97' N32.00W '.<'!' 5,14 N 2,95 W 1200 ' 0 40 1199,97 1049,97' N27'OOW' .::::.!'1.6,02 'N 3,45 W "13'00--~0 .... 45 1299.96 ...... llf9';g6----N3'3';-00W ...... -~7';I0"'"'N ...... 4.07 W 1400 0 45 1399,95 12~9.95- N29.00W 8'22 N 4.7~ W 1500 0 35 1499.94 1349.94 N25.00W' "9.26 N 5.27 W --~-~-'~0 .... 35- 1599,94 ...... 1~4'49 · 94 ' N46.'0:'O'W~'I-0-;0'9-'N ...... ~- 5 · 87 'W 1700 0 35 1699,93 1549,93- Nz+8.00W:.:.-''':' 10,80 N 6,62 W 1800 0 45 1799,93 16z+9,93 :N56,00W "i'"11,52 N 7,54 W -'I'900---0--30 ..... 1899,9'2 ...... 174'9'; 92---N52-;-0 OW ...... I"2; I6--N .............. 8.42 W 2000 0 30 1999.92 18Z~9.92 N62,00W 12.63 N 9,15 W 2100 0 35 2099.91 1949.91 N43.00W ' 13.21 N 9,91 W .... 2'200- 0--'~0 .....2199.9i ........ 204'9-;-9-1~5'-9;.-00W .' .. 'l-3;-;80T-N ......... 10.64 W ~.: · ' ' ' :' 't : . . .~ · DOG LEG ¢ L 0 S U R E 5 SEVERITY DISTANCE ANGLE ..... DEG/IOOFT D M $ 0.00 $ 0 0 0 W 0.000 0.21 N 12 29 59 W 0.250 0.86 N 2.3 24 36 W 0.250 1.70 N 33 41 15 W 0,259 2.46 N 41 10 2 W 0.070 3.04 N 39 59 31 W" 0.180 3,50 N 36 2 37 W 0,090 6,,20 N 32 z~7 39 W 0.160 5.06 N 30 46 ~5 W .... 0.070 5,92 N 29 51 25 W 0.131 6.9~ N 29 /+8 16 W 0.170 8.18'N 29 50 ~' 2 W .... 0,080 9,49 N 29 59 ~1 W 0.052 10,66 N 29 39 59 W 0,160 11,68 N'30' 10 '37 'W 0,215 12.67 N 31 31 28 W 0.021 13.77 N 33 13 30 W 0.160 14.79 N 3~ 43 23 W 0.250 15.60 N 35 56 10 W 0.087 16.5'1 N 36 52 21 W 0.090 17.43 N'37 37 58 W .... 0.090 5ECTIO~ )_~ DISTANCu - 0.00 0.21 0.86 .... 2.37 2.9~ 3,44 ~,17 5,0~ 5.9 6.92 8,I6 10,63 11'"6~ '12,60 13,6~ 14~60 15.34 16.19 17,0~ 8'1 RECORD OF SURVEY TRUE DEPTH ANGLE DEPTH D M SEA DIREC DEG, 2300 0 45 2299,90 2149,90 LNTO, OOW 2400 0 30 2399,90 2249,90:":N64'OOW '-~50'U ....0"'-'3'0 .... 2499~'89 2600 0 30 2599.89 2449,89 N61.00W 2700 0 30 2699.88 2549.88 N63.00W 2900 0 20 2899.88 3000 0 30 2999.88 2849,88 ..NSO'OOW "--'~1~0 .... I ..... 0 ....... 3099~87 ........... 2949-~"8'7'r~N 3200 1 0 3~99.85 3049.85 N69.00~ DOG LEG DINATES C L 0 $ U R'E S ....................... SEVERITY DISTANCE ANGLE DEG/IOOFT D N S 11,63 ,70N 12.6~ 2-N- ............. 13.40 15,55 N 14.15 W W 15,96 N 14.92 .62N 16,07 07'.N 16.65 ............. 17.68 18.70 N 19.21 3300 0 35 3299.84 3149.84 N78,00W 19.10 N 20,54 W --3%-00---0-'-30 ....... 3399 ;. 84 ....... 3'2zi:9-;'Bzi.~5'9~-OOW ' .:i::.:i.i; .~-;'~--N ............... 2I * 4.2 W 3500 0 30 3499,83 3349,83 :.:;N57'OOW :~?!~;~ii.19'9! N 22.I6 W 3600 0 30 :3599.83 3449,83 N67,00W '-..'?]:.::20,31 N 22.93 W -3~00 ...... 0--30 ....... 3699 ' 83 ...... 35fi9 ;'83~NBgg-OOW ...... 2'0-;'~9~N ........ 23,78 W 3800 0 10 3799.82 36~9.82 N58.00W 20,66 N 24.3~ ~ 3900 0 30 3899.82 37~9,82 N~O,OOW 21.0~ N 2~.78 W AIO0 0 20 ~099.82 3949.82 N77,00W': /;:: 22,06 N 25.98 W ~200 0 30 ~199.81 ~049~81 N60.OOW :~"22,~2 N 26.66 W "'A300 '-0 .... 15 4299.81 ...... '4'149;8I- -N3~-gOOW--~22;77~'N ............. 27'13 W ~400 0 20 ~399.81 4249.8~ N14.00E · 23.26 N 27.22 W ~500 0 30 ~99.81 ~3~9.8~ N22.00E 2~,95 N 26.99 ~ ~6~0- '0 .... 20- ~599.80 .... 4'~49';'~0 N 8,00W '-:~ 2'4-;-67-N ........... 26.91 'W 4700 0 ~5 ~699.80 ~5~9,80 N ~.OOW-~'.-~-~25,62 N 27.02 W ~800 0 30 4799.79 ~649,79 N13,00~ .:-:' 26.69 N 27,20 W ---'~900- "0"-30' 4899.79 '--4749,-79--NIl~OOW ' 27;55 ....N ....... 27'38 W" 5000 0 35 4999.79 48~9.79 N 9.OOW 28.48 N 27.55 W 5~00 0 30 5099.78 b949.78 N 8.00E 29.~3 N 27.56 W ...,-~, 18,41 N 39 9 52 W 0.250 19.38 N 40 flO 9 W 0,250 20'20 N 41"'32 .... 56'-'W ............... 0.044 21,03 N 42 18 5 W 0.017 21.85 N 43 ~ 20 W 0.017 22,55 ....N-"43-'"/+O'""35"~'W ................ 0~160 23.12 N 4~ 2 24 W 0.036 23,85 25.14 26.82 28.05 28,93 29,79 30.64 31.40 31.92 32.51 33.37 34.08 34.77 35.42 35.81 36.09 36.51 37.24 38,11 38.84 39.63 40.3'2 N 44 17 56 W 0.160 N'~4'"41'-54-W ............. 0,500 N 45 46 23 W 0.261 N 47 5 25 W 0.410 N'47"46'"28 W ......... 0'090 N 48 ~ 21W 0,0~7 N 48 27 53 W 0.087 N 49 1~ 4i W 0,191 N 49 40 14 W 0.330 N 49 39 31W 0.330 N'49'26 45-W ........... 0.026 N 49 40 6 W 0.160 N 50 3 24 W 0.160 N 50 0 3-W 0,250 N 49 29 12 W 0.090 N 48 24 45 W 0.160 N 47 28 35'W .... 0,160 N 46 31 35 W 0,410 N 45 32 23 W 0.250 N 44 49 43 W 0.017 N 44 2 35 W 0.090 N 43 6 56 W 0.090 DISTANCE 17,89- 18,7 20.13 20,83 2 21, 22,58!~ 2 25,16 26,08 26;7~'--'-- 28,21'~ 28.7~ 29.13 29.66 30,5~ 31.63 ~2.7~ 33.25 33,-B6-m- 35,81 36.66 .... 37.57 38-43 CHEV WELl. SCU Z~l-9-A ..SURVEY 5 'JUNE 81 RECORD OF SURVEY TRUE: DEPTH ANGLE DEPTH D M SUB DR SEA '" DIREC DEG. DOG LEG D'iNATES ...... C'"'L"O'"S'"U' R"E ..... ~ .................... ~EVERITY- DI STANCE ANGLE DEG/IOOFT .................................................. ........ .... s_ ........................ SECT DISTANCE 5200 ~.0 50 5199,77 5049,7'~ 27,58 W 41.19 N 42 I 45'W 0,340 5300':0 ~5 5299'76' ~'97./N 27'50 W 42.17 N 5500 1 0 5499,7~ 5349,74 N 5,OOE ' '~5,17 N 26,85 W 44,25 N 37 21 35 W 0,140 5600 1 15 5599,72 5449,72' N ~,OOE -.. ~7e13 N 26,71 W 45.7~ N 35 -~-~0 1 1~ .....~&'99~69 ~"'=N'~!'!'~:~ 26,6~ '~ ...........47.~8"'N'-~4 ......... 7-""25--'W ......... ~;044 590~ i 0 5899' N--'726.89 ~ 51.09 N --~O'O0---O-'"~ .... ~999; ~07 ~ 52'.~8"N 31 ......... 3-'20-W .............. 0.250 6100 0 50 6099.63 5949.63 N]6.00~ .-G6.3! N 27.$9 W 53.81N 30' 36 37 ~ 0°090 6200 0 ~5 619~,62 60~9,62 N 8,00W :~7,66 N 27,68 W 55.~2 N 30 9 ~ W 0,090 '--63-00 -0 ~U"-6'2'99;'6- 7~-"~8','11-'W ........56.33-N'29'"56"-"27-W ..............0'080 640.0.'i.0 A5 6399,60'.;.62~9 8A:...:N 28,81W. 6500 :O 30 6499,60 63.49'60:i 6.~':~iN 29,55 W '--65U0---0--30--"6599~59 ..... 6'4'~9"~5~ ;~8'-N ......... 30'14 W 6700 0 25 6699,59 6549,59 N33,00W 51.96 N 30,57 W 6800 0 25 6799,59 6649,59 N38,00W 52,57 N 31,01 W --690U---0--~'0 .... ~899~59 GT~'~;5~N'~'~O-O-W.'!..:.:.i::;~:~?.'5-~';I6-N-i ..... ~'."'31,57"W ...... 7000 0 3o 6999.5 6 49.587.? NE 'OOW' :ii'ii iEa*70 N 32.25 w 7100 0 40 7099,58 69~9,587'-N~9'"OOW.i!iii~!~?~:i54,40 N ~2,99 W 72'00--~0-'-30 ........ 7199.57"--70~9-;57 .... N'~'~O'OW "i""?'"gE'~IT-N ...........33,66 W 7300 0 15 7299.57 71~9,57 N34.00W 55,68 N 3~.06 W 7400 0 20 7399,57 7249,57 N58,00W '~'56,0~ N ~4,43 W 57,57 N 30 I 41W · 0,080 58,63 N 30 16 32 W 0,250 ' '59,48 N 3'0' 26-'43"W ............. 0,174 60,29 N 30 28 23 W 0.070 61.04 N 30 32 5 W 0,038 61.83 N"30 42 II'"W ............... 0.070 62.64 N 30 59 11W 0.044 63,62 N 31 13 54 W 0,170 64.63 N'31'"23' -7"W ...... 0.170 65,28 N 31 27 23 W 0.250 65.77 N 31 34 5 W 0,090 7500" 0---~0 ...... 7499';56--'-7~'4-9':;-5~'5-~-;UOW.-i,~i~?5~-;'Z~-5- N' 35;03'W ............... 66.4.~+ N Sl-'-49'"'28--W ....... 0.160 7600 0 25 7599-56 '7449'56:~:('.:.N65'OOW:.?~}56~87 N 35,73 W 67,17 N 32 8 24 W 0,070 7700 0 15 7699,56 7549,56::':'::~N29,00W- ";~L.57,27'?.N 36,16 W ~00--~--25 ....... 7799.56 .... 76'~'TE'~5'i~'OOW .... 57';72-'-N ........ 36.54 W 7900 0 15 7899.56 77~9,56 N37.00W 8000 0 30 7999,55 7849.55 N58.OOW 58,15 N 36-95 W 58,59 N 37,43 W 67.73 N 32 16 0 W 0,180 68,31N 32 19 59 W .... 0.180 68,89 N 32 25 58 W 0-180 69,5'2 N 32 34 20 W 0.250 54.9~. ..57. 58,~2 59; 60.06 60.80 '6~';"5'~ 64,29' '- 65.~! 66.72 " 67.26 67'83-- 68.39 69.00 .i ! · ;:';' :S ]-~]N~I~'E'-~]qOT'-SURV'EY ...................................................... 5 .... ,JUNE 81 ,. ~!': L..)~ ~ ~ i,~ ~.,~.· ~:. RECORD OF SURVEY TRUE ~EA~;=UR]F¥'-'VERTI'CAL ................... DEPTH ANGLE DEPTH SEA D 8100 0 15 8099,55 7949,55 39., OOW 8200 0 15 8199.55 8049.55 1,'OOW .... ~'3-0'O .... O .... 30 ....... 8'299~55 ......... 8400 0 ~5 8399.54 8249,54 N78.00W 8500 0 30 8499,54 8349,54 N73,OOW T-~O'O--'~-~O ........ 85'99;5 8700 0 30 8699.53 8549,53 8800 0 25 8799.53 8649,53 iiN57'C 9000 1 20 8999.50 8849.50 N68.00W 9100 1 10 9099.~8 8949,48 N53,00W --9200--0--55 ........ 9199146 .... 90~ DIREC DEG. ,02 ..:N 37.91 W 59'38 N 38,16 W 79'"N ........ : ....... 38.65 W 60,11 N 39.69 W 60,38 N 40,75 W 4I"~ 58 W N '.i"42. Z W '64'N 42,94 W DOG LEG C L O S U R E $ ....................... SEVERITY DISTANCE ANGLE DEG/IOOFT D M S ' 70.15 N 32 43 5 W 0.250 70.58 N 32 43 56 W 0.035 '71.20 N 32 .... 52"53'W 0,250 72,04 N 33 26 23 W 0,250 72,85 N 34 0 52 W 0,250 73.55 N--'34'25-4;I-'W .......... 0-026 74,34 N 34 41 22 W 0,216 75,12 N 34 5), 47 W 0,070 ;'05-N ................. 43'~80 W .... 75,95 N 35 13 12 W ....... 0.240 62.65 N 45.45 W 77,40 N 35 57 38 W 0,670 63.72 N 47.35 W 79,39 N 36 36 54 W 0.170 ................ 48'99 W' 81'01 N'37 12 27'W '0,240 9300 1 5 9299.45 9149,45~ N72,00W 02~'N 50.68 W 9400 0 15 9399,44 9249j44:'..$87,00W !ii'i.iii"65,I7.i N 51 83 W · 94 9.44 ....... w- ............ 52:4 w 9600 0 30 9599.43 9449.43 S72,00W 64.82 N 53.31W 9700 1 0 9699.43 9549,43 NSI,OOW 65,05 N 54,55 W --9'50U U'-55 ........ 9799.4I ......... 9-~'~9'%~I-/'?N~3%OOW-~66¥20-N .......... 55,78 W 9900 1 0 9899,40 9749,40 N29,00W ?.'67.,56 N 56.76 W 10000- 0 30 9999,39 9849,39 N53.00W .... ~-768,54 N 57.62 W I'0100'-~U'-~5-10099,38 .... 99~g;'3~- '$83-;OOW~8;'82--N ................ 58,65 W 10200 1 0 10199,37 10049,.37 N78,00W 68.88 N 60,16 W 82.4~ N 37 55 57 W 0,160 83,27 N 38 29 38 W 0,840 83,60 N 38 53 -1W 0.250 83.93 N 39 26 3 W 0,026 84.90 N 39 58 47 W 0.500 86,57 N 40 6 57 W ...... 0.070 88.24 N 40 2 15 W 0.070 89,54 N ~0 3 5 W 0.500 90.42 N 40 26 16 W 0.250 91.46 N 41 8 6 W 0.250 A-150'gE--SUR-9 EY S--A R E-- GYROSCOPiC'~-OEL-OW-~ N'G-~Iij'RJ/E~--~R E'-'$ INGLE' SHOT ,, ; . 10200 1 0 10199,37 10049,37' NT8,00W. - 68.'88 N 60.16 W 1-03'82---2-30''~ 10381 , 28- 1'0231--;28---S72;0~0W--6~8~.. 60-N ............ 65 · 65 W 10489 4 45 10488.06 10338,06 N48,00E _ 72;80 N 68.08 ~ 10594 4 15 10592.74 10442.74 N48.00E 78,32 N 61.96 W .... -:i:;' ~ ............... .. .: . 91.46 N 41 8 6 W 94.95 N 43 44 37 W - 99.68 N 43 ~ 47 W 99.86 N 38 20 56 W ,~. 0,000 0-825 2.328 0,476 SECT'I DISTANCE "' .... 69,60 70,¢ 71.~5 72,05 73,39 74.12-.-.:~ 74-87 76.12 77,91 ' 79'~3F:~' 8 0 · 5 81.47 82.21 8 3 ~7'T-~' 86,68 87,37 88,08 88,08 90,18-- 95.03 97,37 GIEV WELL SCU 4Z-9-A TRUE ~ DEPTH ANGLE DEPTH D M RECORD OF 'SURVEY SEA DIRE¢ DEG. 10829 6 30 10826,69 10676., 3 "TF~'E'--FOEEOWI 'NG .... I N F 0 R M A'T I ON ...... I-$---EX~7~P 0 10847 6 30 10844.57 10694,57 N37,00E 96.15 N BOTTOM"HOLE CLOSURE 5 JUNE 81 DOG LEG INATES C L 0 S U R E S ............. SEVERITY DISTANCE ANGLE DEG/IOOFT D N S 47,.1i~!'w 105.61 N 26 29 37 W 0,959 SEC DISTANCE 105 45,88 W 106.54 N 25 30 46 W 0.000 106.54 'CHEV-WE-[i~-'- S C~ 41 ';'9' A :{MEASURED DEPTH AND OTHER ~' TRUE '; ......~'f~g'[i~ E D ................... VERTI DEPTH DEPTH =~--S-"i N'G i2 ~':i~HOT-'-SO R V ~ ...................................................... '5" "JUNE DATA FOR EVERY .EVEN '100 FEET OF .SUB .SEA DEPTH. I CAL ........ . ~ CORRECTION TOTAL SEA>' D I FFER ENC E . 250 250. 100 0 350 350- 200 0 450 .................................... 45'0. 550 550. 400< 650 650. 500 75'0 .................... 750'; ........... 60U'----T'O' 850 850, 700 .0 950 950. 800 0 1'05'0 ................................. 1050. 1150 1150, 1000 1250 1250, llOOL I'350 ........................ I'350-~ ............ I'2 1450 '1450. 1300 0 1550 1550, 1400 0 I650 ..................... ~'16'50"J ........ IS'OO,~--O 1750. 1600 1850. 1700 ......... 1950' ............ I'800- --'0' 2050, 1900 0 2150. 2000 0 2250~ ...... 2100 .'"-:-'O---~:.'ii~.",'L:. .................... 2350, 2200 0 ~.:!:~ 1750 1850 1950 2050 2150 2250 2350 2450 2550 2650 2750 2850 2950 3050 2450, 2300 ..... 2550'~ ........ 24'00 ...... O' -- 2650, 2500 0 2750, 2600 0 2850. 2?00 o 2950. 2800 ' 0 3050. 2900 0 -3'150 ........... 3150; ......... 3000 .... 0 ~250 3250, 3100 0 3350 3~50, 3200 0 3'~50 .......... 3450. ......... 3300 ..... 0 3550 3550. 3400 0 3650 3650- 3500 0 COORDINATES 0 0.05 N 0.00 W 0 0.45 N 0.16 W 0 .................... 1-14 N ......... O'.60'TW ................. 0 1.63 N 1,29 W 0 2,08 N 1,85 W 0 .................... 2,56 N 2.01"W .......... 0 3.15 N 2,13 W 0 3.93 N 2,~4 W 4.75 N ....... 2,7~'-W ......................... 0 5.54 N 3.19 W 0 6,55 N 3,73 W 0 .................. 7.65' N ...... 4.41'"W .............. 0 8,76 N 5.03 W 0 9.70 N 5.53 W 10.44 N ........ 6"24-W .............. · :':.':'. 0 11.15 N 7.04 W "'~ 0 11.86 N 8.03 W 0 .............. 12.41N ....... 8'78 W 0 12.88 N 9,54 W 0 13.5~ N 10.26 W '0 .................... 14.04 N ..... 11.07 W ......... 0 1~.49 N 12,18 W '~ 0 14.90 N 13,02 W 0 ..... 15.34 N 13,77 W 0 15e76 N 14.54 W 0 16.15 N 15.28 W 0 16.45 N 15.82 W 0 16.81N 16,84 W 0 17,41N 17.08 W 0 ................. 18.34 N 18.42 'W .... 0 18.95 N 19.'95 W 0 19.24 N 21.01W 0 .... 19.67 N 21,80 W .... 0 20.13 N 22.54 W 0 20,45 N 23,35 W 81 C H-'E V,:~E L:E.-':5C U v.,,: i-.;- 9 - A 'F.~EASURED DEPTH AND OTHER DATA:FOR:EVERY::~VEN 100 FEET_OF SUB ...................................................... 5-;JUNE' '81 SEA DEPTH. TRUE -rq'EA'S'UR E D .................. V 15 R T DEP TH DE PT H SE CAL': ......... ION TOTAL COORDINATES 7250 7250, 7100 7350 7350, 7200 7550 7550" 7650 7650. 7'75'0 ................................. 7750~ ......... 7 7850 7850, 7700 7950 7950. 7800 8'0'50 ............................... 805 825o 8250. 81oo '8'3'5'0 ................................ 8350'; ......8 8~50 "~450, 8300 8550 8550. 81~00 0 0 8-6'5'0 ............. -- .... 865' 0"~'----:::8 5'00~7--0--~7 :.:':.:::::~ ::..::. ::':! ::. "'~-0 ............. 8750 875 o. 860'0 ;!.:: ,i:.:.:::i/:.!: '0 :i:: :?':'"~:,:!!!~i'i.!!:.!i~ ?:!::$:::: 0 s850 as 5o... ·' ~7'oo-i:'::, ~::-!~i~', o'. :'::'":':' :": o 8950 .................... 8950, ...... '8800 :" o' '=' ?">'":" -- ........ 0 ........... 9051 9050. 8900 9151 9150. 9000 9'251 ................... 9250'; ......9100 9351 9350. 9200 9451 9450~ 9300 955! ..... 9550' ......... 9~00 9651 9650. 9500 9751 9750. 9600 9~5! ......................... 98'50; ..... 9700 9951 9950, 9800 0 55.46 0 55.86 J: .................................................. 56.22' 56.69 57.05 57.~8 57.94 58.35 58,81 59.19 N 59.58 N 59,96 N 60,25 N 60.52 .. " 60.85 N 61.~! N 61.84 N 62.29 N 1 63.14 N 0 6~.23 N 0 .............. 64.75 N 0 65.19 N 0 65.15 N '0 .... 64.95 N -1 6~.79 N 1 65.62 N 0 66,84 N 0 68.19 N --1 68,76 N 0 68.79 N 0 69.03 N 0 68.85 '0 ....... 70.~0 N 1 76.13 N 0 81e40 N 10051 10050, 9900 0 10151 ............... 10150; ......1000'0 0 ...... " 10251 10250. 10100 0 10351 10350, 10200 0 10451 ~ 10450, .... 10300 .... U 10551 10550. 10400 1 ":.:.' 1065i 10650. 10500 1 N 33,90 W N 3~.22 W N ........ 34,70"W N 35,38 W N 36,00 W N "' 36'30'""W .................... N 36,78 W N 37.13 W N ............... 37 ,; 73 W 38.05 W 38.3~ 39.12 W .......... 40.28 W ~1,17 W ....... ~1i97"'W ................. ~2,62 43,30 W ..... ~.~9 W 46o~7 W 48,18 49,80"W 51.43 W 5~,10 W ' 52.90 W 53,86 W 55,20 W 56.30 W .............. 57,21W 58~06 W 59.~6 W 61,'2~ W 64.39 W 68,52 W ....... 64,38. W 58,69 W ~ EHEV WELL SCU 4i'9~'A .... -~'~-~-['E'-'S-~CJ'T'-$URVEY 5 JUNE ~!EASURED DEPTH AND OTHER DATA FOR EVERY".EVEN ],00 FEET OF SUB SEA DEPTH, TRUE 'M'E'A'$ IL JR E D ............ V E R T-] R T I CA L DEPTH DEPTH CTION 10752 10750, 10600 1 , 0 TOTAL COORDINATES 88,17 N 52o~ .H_~_A__s_u_R__E_D...,,.DEp?H AND.OTH. ER...DATA FOR EVERY ,EVEN 100 FEET OF SUB SEA DEPTH, TRUE ¥tEA"SUR ED .................. V E RT'ICAK- SUB~'MD;~TVD-T¥ -----VER T ! CAI' DEPTH DEPTH SEA':< D E~ CORRECTION 3750 3750. 3600 0 0 3850 3850. 3700 0 950 3950. ,050 ' 4050 4150 · 5'0 .......................... TOTAL 4350 4350. 4200 0 0 4450 4450, 4300 0 0 4650 22 23 24 25 26' 27' 27. 0 28. 0 ............................ 29, 0 31, 0 32, 0 36, 0 38. 0 .....................40, 0 42, 0 44, 0 ....... 45, 0 46, 4950 '~950. 4800 5050 5050. 4900 5150 ...................... 5250 5.250. 510( 5350 5350, 5200? '5~50 ...................... 5~50"; ............ 5300 ....... 5550 5550. 5400 5650 5650, 5500 5'750 ..................... 5750'~ 5850 5850. 5700 5950 5950- 5800 ~'050 ................ 6050' ........ 5900 ............ 6150 6150. 6000 6250 6250, 6100 0 0 6550 6550. ' 6400 · 0 :' . 0 48, 49* 50. 50, 51. 52. 52, 53, 54. 54. 6'650 ................... 6650; .......... 6500' 6750 6750. 6600 6850 6850. 6700 6~50 ...................... 6950'; ..... 680'0I 7050 7050. 6900 7150 7150. 7000 COORD INATEF, .55 ,79 .37 .94 ,15 .55 .98 ,57 .30 .05 21 12 99 97 93 30 65 30 09 22 40 52 26 62 99 28 31 93 63 26 86 O0 82 N 24.14 N 24.5.1 N ........... 25'06'-W N 25,67 N 26,29 N ....... 26~96W N 27,22 N 27,13 N .......... 26'80-W N 26.96 N 27,10 N 27,30"W N 27,47 N 27.59 N '27,45-'W N 27.62 N 27,32 N 26.96 N 26,78 N 26.66 N 26.58'"W N 26.83 N 26,96 N 27,21 N 27,57 N 27.84 N .... 28,44'"W N 29,19 N 29,87 N 30.36 N 30.'78 N 31,26 N 31,90'"W N 32,61 N 33,34 ~'-S-! N G'i~E'"' ~'~.'OTT"S U R V E Y IN'TERP~OE~A'TED VALUES FOR EVEN-iO'OO-FEET"-;OF""NEASURED DEPTH. SI TRUE ...... ~4EASURED VERT'ICAE DEPTH DEPTH -' ..................... 7000 ....... 69'99' ........ ~8~'9"~ ~' 8000 7999, 7849, 9000 8999. 8849* ~ lO000 ............................. 9999 FAL :"" COORD I NATES 1000 ................999. . ;3'4'-'N ............. 2. 2000 1999, 1849. 12,63 N 9, 3000 2999. 2849, 17.06 N 16. ~0'00 .................................... 3~ ',..:' 25, 500'0 4999' 4t ,.:.. .48'"N 2'7. , 6000 5999. ¢4"96 N 27. 3'~'70'"N ................ 32. 58,59 N 37. 6.2.65 N 45. ~4""~ ................ 57, ................................ .5 '-JUNE 59 W ................... 65 W 35 W .............. i' ................... ' ........................................... 55 W ' 07 W - 25 ~ 43 W 44 W 62 W ....................................................... ..... ~ ~ ICHEYRON U.S.A. ....... ? .............. ~ ..... WELL. S.C.U: 4l=9 . . ~ .... RADIUS OF-¢URYATUFIE- t · = +-' ' GYROSCOPIC!/SINGLE-SHOT SURVEY ...... ~ ....... i SCALE* I" si IOOO"~ ........... = ............ .........., + ........ ,, '~! dU' N-'8'L +-.J.'9-:~l ......, ~ ............... ., _ ~- ............ , ! . 1 ; J ALL DEPTHS SHOWN ARE TVD ~ '- i ~ .... i ~ i . , I .... ~ ~ ~ ...... ' ~.:-' .--~ ' ,: '::'i HORIZONTAL--VIEW~-~-: ... , .................... ' ~.~ - ~ ....... ~ :'T : ~ ' ~ 'R ' " -" ' '--- J '---~ ............. ~ .......... ~ ' ~~-.- ~ ~ ..... ~- . : ~ ~. : ,~ ADIUS OF CURVATUR~ · . . : . . ~ . , · ~ .................. ....... ~ ..... ~: ~ - ' ' , , [GYRO~COPIC~SING~E SHOT SURVEY ~' i ''' ~ Oo~ i -C '~ ~'' '' ; ---'~:: ~ -~ ~ i , ; ~ : '~:--: ; ~'' ~ . : ~ ~ J,-JUNE:-~8, 1981.~--~ ~-~ ........................ ' ~ ..... ~_.. , . ,: :;. ,:::...~, .._ . ,' i , ~1 ~ i . , ~ · . , ~ . ~, E , - - ~-~ ~ , I : ~ · ~ . ~ .......... i . ~ - ~. :, .... · ~ ' ! ' ' ' i ' ' .... ~~ ............ [ .... ~ , ~ . . , . . , - , ~ , : ! '- f '' ' d ...... ~ ..... ~ ~:~ ::..'-. ; : ' ' ' ' ~ ' ' ' ' : ' ' t ~ ' I ' ' ; : t · , : ,' ~ ' ' ' .... ' .... ....... i : ; ~ . ~ : I.. i I ' - ~ ' ' , . : , ] i -; : ~ . , _ ' . ' . ' i ' : ' : / I ' . ' ! ' ' :~ ' ' ' . ' , ........ , .... ' . ~ · , , · ,.. , . , · , , . - ............ ~ .... H---q , ,- , -~--.--, ........ ~ ...... '-~.- , . i ' : ' I . I I . ' I i I · [ I I I Il I i ...... e ' . . ' ' : - T ..... I-~'~~ ..... ~-~-T ........ ~ ................ ~ ........... ~ ' _ ~ J ' ' r ".J ' ~ ' '' I : ]' .~ ~- . .... ,. ...... i . . ....t ~~ .... ~ :---~-~ ........ Check Form for timely compliance with our regulations. OperatOr, Wel 1 Name and Number Reports and Materials to be received by: Required Completion Report Mud Log Core Chips Core Description Registered Survey Plat Inclination Survey N~ Directional Survey Drill Stem Test Reports Production Test Reports Logs' Run \ ......· ~ 1/ Yes Digitized Log Data ~~¥/ Yes Yes Date Received Remarks - STATE OF ALASKA //~ ~ ALASK~'-~riL AND GAS CONSERVATION C/-'"VlMISSION MONTHLY REPOR1 4F DRILLING AND WORKOVER OPERATIONS'1'' · Drilling well [] Workover operation [] CONFIDENTIAL 2. Name of operator 7. Permit No. CHEVRON U.S.A. INC. 80-107 3. Address 8. APl Number P 0 Box 7-839 Anchorage Ak 99510 50-133-10129-01 4. Location of Well atsurface 710's, + 660' w from the NE Corner of Sec. 9, T7N, R9W, SB + M. 5. Elevation in feet (indicate KB; DF, etc.) 150 ' KB 6. Lease Designation and Serial No. A-028997 9. Unit or Lease Name Soldotna Creek 10. Well No. SCU 41-9A 11, Field and Pool Swanson River Hemlock For the Month of, May ,19 81 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks R/u to pull Tbg. Cut + Pulled 10,400' 2 7/8" Tbg. + Pkr's. Fished out 195' Tbg. Pushed 38' Fish to 10687'. Ran Logs. Laid 1st Plug w/55 SX "G" at 10384' - 10684'. Pumped 55 SX "G" for 2nd Plug, Down-Squeezed w/10 CF Mud. Top of Cmt. at 10422'. Abandonment Plug apprOved by U.S,G.S. 5-9-81, A.O.G.C.C. Waived Witness. Tested Casing to 2500 Psi. Milled Window in 7" Casing 10340'- 10384'. Cmt'd w/40 SX "G", Down Squeezed Cmt. w/9CF Mud. C/° Cmt. to 10360'. (continued on back of page) 13. Casing or liner run and quantities of cement, results of pressure tests 5" 18#/Ft N-80 Liner - 10845' - 10136' Shoe at 10845' FC at 10800' Cmt'd w/68 SX Class "G" Tested to 2500 Psi. 14. Coring resume and brief description None 15. Logs run and depth where run DIL 10843' - 10340' Compensated Densilog-Neutron 10838' - 10374' CBL - CL 10799' - 10011' Neutron Lieftime - GR-CL 10799' - 10380' CDN-GR 10679' - 10340' RECEIVED 1 6. DST data, perforating data, shows of H2S, miscellaneous data None JUN 1 6 198] Alaska Oil & Gas Cons. Commission Anchora~ 17... I hereby certify,,thatith~i~bregoing~,.,) ~~/~',, - -- is true and correct to the best of m'y knowledge. SIGNED T. L. PER "'~, TITLE Area Oper. Supt. NOTE--Report on this form is required for eac~alendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15~h' of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicete Rev. 7-1-80. 12. (continued) Second Plug, 100 SX "G". Tagged Hard Cmt. at 9660'. C/o Cmt. to 10344'. Test BOPE. Drl'd w/6" DYNADRILL to 10847'. Ran Logs. Ran Liner + Cmt'd. Tagged Cmt. ~} 10612' w/ 4 1/8" Bit, C/o Cmt. to 10799'. Test Liner + Casing to 2500 Psi. Ran Logs. Ran Production Tubing, Tested Tbg. to 2000 Psi, 6-1-81. Remove BOPE, Release Rig 6-2-81. ' c · ~, STATE OF ALASKA ~ ~ ~/',!~'/ ~'--M ALASK ~-~IL AND GAS CONSERVATION Cc' ~IMISSION ' /~,, ONTHLY REPORTOF DRILLING AND WORKOVER OPERATIONS · Drilling well [] Workover operation ~] I ~/ 2. Name of operator ' 7, Permit No, CHEVRON U.S.A. INC. 80-107 , ' . 3. Address 8. APl Number P. 0. Box 7-839 Anchorage, AK 99510 50-133-10129-01 4. Location of Well atsurface 710' South and 660' West from the Northeast corner of Section 9, T7N, RgW, SB&H 5. Elevation in feet (indicate KB, DF, etc.) 150.' KB 6, Lease Designation and Serial No. A-028997 , For the Month of Ap ri i 9. Unit or Lease Name Sol dotna Creek 10. Well No. SCU 41-9A 11. Field and Pool Swanson River Field Hemlock ,19 81 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Commenced operations 2400 hours of April 28, install 5000 psi A0&GCC waived test. USGS witnessed ~and approved. BOPE. Tested same. 13. Casing or liner run and quantities of cement, results of pressur9 tests N/A 14. Coring resume and brief description N/A 15. Logs run and depth where run N/A 1 6. DST data, Perforating data, shows o~ H2S, miscellaneous data N/A RECEIVE!I MAY 1/, i ',J Alaska 0ii & Gas Cons. L~.~missi0n' Anchorage 17. I hereby certify that the foreg~nd correct to the best of my knowledge· _~~ ~ Area Operations Supt. SIGNED ~ ~ LE_ ~ _ _ ~ ..... DATE. NOTE--Report on this form is required for each calendar month, regardless of the Status of operations, and must be filed in duplicate With the AlaSka Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate December 15, 1980. Mr. R. W. M agee Area Engineer Chevron U.S.A., Inc. P. O. Box 7-839 Anchorage, Alaska 99510 Re: Soldotna Creek SCU 41-9A Chevron U.S.A., Inc. Permit No. 80-107 Sur. Loc.~ 710'S, 660'W of NE cr Sec 9, T7N, R9W, SBM. Bottomhole Loc.: 69'N, 61'W of the surface location. Dear Mr. Magee: Enclosed is the approved application for permit to drill the above referenced well. Well samples and a mud log are not required. A directional survey is required. If. available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereund6r (Title 18, Alaska AdminiStrative Code, Chapter 70) and by the Federal. Water Pollution Control Act, as amended. Prior to Mr. R. W. Mcgee Soldotna Creek SOU 41-9A -2- December 15, 1980 commencing operation~ you. may be contacted by a representative of the Department of Environmental Conservation. Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit' to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a repre- sentative of the commission may be present to witness testing of blowout preventer e~uipment before surface casing shoe is drilled. In the event of suspension or abandonment, please give this office adequate advanoe notification so that we may have a witness present. Very truly yours, Hoyl~ H. Namilton Chairman of ~Y O.~DE~ OF' Ta~ CO~'~ISS~ON Alaska Oil & Gas Conservation Commission Enclosure Department of Fish & Game, Habitat Section w/o eno1. Department of Environmental Conservation w/o/she1. Department of Labor7 Supervisor, Labor Law Compliance Division w/o encl. Chevron U.S.^.' Inc. P. 0. Box 7-839, Anchorage, AK 99510 · Phone (907) 279-9666 October 16, 1980 SIDETRACKING OF FIVE (5) SCU WE[ SWANSON RIVER FIELD - ALASKA Mr. Harry W. Kugler Commi ssi oner Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99510 Dear Mr. Kugler' Please find attached Form 10-403 for abandonment of SCU wells 21-4, 12-3, 42-5, 44-8, and 41-9. Form 10-401 is al so submitted for the sidetracking and recompletion of SCU wells 21A-4, 12A-3, 42A-5, 44A-8, and'41A=9. Separate application for abandonment and recom- pletion was' requested by Your office. Mr. B. E. Wondzell has advised us that resubmission of well programs and technical information as included in our original application will not be necessary. Very truly yours, Area Engineer :MJA'sj Attachments 980 Alaska 011 & ~a~ P,o.~, Cornrrll$~ion Anchorage RECEIVED DEC1 2 i9~0 Alaska Oil & (~as Cons. Comrnissio. Anchorage 100 Years Helping to Create the Future Form 10-401 ' REV. 1-1-71 SUBMIT IN TK JATE (Other instructions on reverse side) STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DEEPEN ['-] SINGLE MULTIPLE ZONE ~] ZONE la. TYPE OF WORK DRILL [] b. TYPE OF WELL OIL~ GAS r"-! WELL L~ WELL [~ OTHER 2. NAME OF OPERATOR ChevrQn U.S.A., Inc. 3. ADDRESS OF OPERATOR P.O. Box 7-839, Anchorage, Alaska API 950-133-10129-01 6. LEASE DESIGNATION AND SERIAL NO. A-028997 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Soldotna Creek 9. WELL NO. SCU 41-9 /9 10. FIELD AND POOL, OR WILDCAT Swanson River 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 4. LOCATIONOFWELL710! South and 660' West from the Northeast corner of At surface Sec. 9, T7N, R9W, SB&M Atproposed'prod. zone 69~ north and 61' west of the surface location 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Approximately 16.5 miles from Kenai Sec. 9, T7N, Rgw, SB&M 12. 14. BOND INFORMATION: · VPENationwides~etyand/orNo. SL 6205862 AmountS150}000 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest drig, unit, if any) 2040' 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 660' 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 150'KB 16. No. OF ACRES IN LEASE 1120 19. PROPOSED DEPTH 10840 ' 17. NO, ACRES ASSIGNED TO THIS WELL 40 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK ~qLL START lO/8O 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Quantity of cement As in exL'~ting w(~ll SCU 41-9 We propose to sidetrack SCU 41-9 to within 50' Of the existing location per the attached program. ' ~,1, ~" ........ ~ ~O~ SPACE DESCmBE PRO~SED PROG~M: If propo~l is to deepen ~ve data on present productive zone and ~se~:~' &;Ii ~; new productive zone. If pr0~ is to ~ or deepen ~ecfion~y, ~ve pert~ent data on sub~face locations ~d measured ~d true ve~ dep~s. Give blowout preventer pro,am. 24. I hereby ~e~Fgregging is~T~ru~_~ an~d Correct (This space for State office use) SAMPLES AND CORE CHIPS REQUIRED [ MUD LOG [] ~s [~o ] [] YES DIRECTIONAL SURVEY REQUIRED ~YES [] NO DATE CONDITIONS OF APPROVAL, IF ANY: OTHER REQUIREMENTS: A.P.I. NUMERICAL CODE 3-o -/Z3 -/olz.~- ot ~TLE Area Engineer PERMIT NO.__~ '__7 APPROVAL DATE APPOVED BY TITLE Chairman *See Instruction On Reverse Side Dacanber 15, 1980 DATE 12/15/80 PROPOSAL FOR WELL OPERATIO?.IS PRO 316-1 Field' S~,,ans on River - Property and Well No.: Soldotna Creek Unit 41-9 Surface Location: 710 feet South and 6"60 feet West from the Northeast corner of Section 9, T7N, R9W, SB & N. Bottom Hole Location:' 69 feet North and 61 feek W~st o~ the surface location. 'Total Depth' 10,852 feet Plugs' 10,760 feet. Casin~ : 20" conductor pipe cemented at 28 feet. 11-3/4" 47.5# cemented at 1,998~feet. 7" 23~, 26~, and 29P cemented at 10,849 feet. Note: 13 feet pup joint 10,285.5 feet - 10,298.5 feet. Partially co~lapsed casing at 10,709 feet. Perforations: 5 - ~" holes at 10,467 feet-WgO ~ 2 - 3/8" holes at 10,499'; 10,561'; '10,604'; 10,609; 10,670'; 10f724'. 4 -'~" holes per foot: 10,483'-10,510'; 10,522'-10,542'; 10,557'-10,567'; 10,592'-10,625'; 10,632'-10,636';. 10,656'-1~,735' Reperforated - 4 - ~" holes pe~ foot: 10,525'-10,539'; 10,560'-10,564'; 10,595'-10,633'; 10,659'-1'0,695'. Tubino' See attached tubing detail .. Junk' Left in hole: 2 7/8" Venturi shoe, 1 jr. 2 7/8" EUE tubing, and 2 crossover subs. Top of fish 10,709 feet. .o Datum' 15 feet above-ground level at original KB elevetion of 150 feet. Blowout Prevention Considerations' For killing and redrilling 1. Potential Problems: A. Gas may be e'ncountered after packers are released,while cleaning out the 7" prior to abandonment and while redrilling. Shut.in tubing pressure is approximately 3000 psi. Care must be exercised not to swab the well while tripping or pulling production equipment. B. Extreme caution must be 'exercised while redrilling due to the possibility of high pressure water entries. The first 100 feet Of int&rval~to be ~edrill&~ is normally drilled with 98 pcf mud. The programmed mud weight of 77-79.pcf will overbalance a 5350 psi pressure by 175-320 psi. C'. A mud weight of 77-79 pcf should minimize potential for lost circu- lation while drilling the Hemlock. However, LCM should be kept on hand at all times. D. Any kicks should be handled by normal procedures. All personnel should be made aware of these methods and care must be exercised at all 'times. The hole is to be'kept full at all times. 2. Maximum anticipated formation pressure' A. 5350 psi in the "G" at window depth 10,340 feet. B. 4650 psi in the He~nlock. Top Hemlock 10,470 feet. 3. Maximum possible surface pressure' 3500 psi. 4. Blowout prevention equipment: Class III - 5000 psi for all o o o . . o . . PROGRAM Open "C" sleeve at 10,370 feet. Move in drilling rig and kill well with 66-68 ~cf mud. Install safety plug in donut, remove xmas tree. Install and test Class III, 5000 psi BOPE, inc.lud~ng 5000 psi blow and kill lines. ~ivision of Oil & Gas Conservation and U.S.G.S. to witness test. Remove-plug. Release packers. Uppermost packer is a Baker "FH" at 10,404 feet. Remaining hydraulic packers are Brown "HS-16-1" at 10,513 feet and a Baker "FH" at 10,580 feet.-There are no safety joints. . Pull tubing and production equipment. Clean out 7" casing to top of Baker model "F" packer at 10,648 feet (E-log depth). . R~n packer mill and recover Model "~".packer. Make note of E-log - drill pipe depth correlation. Clean out to 10,709 feet. Condition mud for logging. Take ~2 gallon sa~nple before pulling out. 10. Run Dresser-Atlas Dual Spaced Compensated Neutron - GR log from cleanout depth to 10,340 feet. Use 0-60% porosity scale and 0-100 GR scale. 11. 12'. ].3. t5. 16. Run drill pipe to 10,709 feet, equalize + 400 lineal, fect in stages if necessary, of Class "G" cement. Puli. out of cement, close pipe rams and down-squeeze to leave top of ceme'nt at + 10,400 feet. , Run bit and tag top of plug. If below 1.0,400 feel:, recemcnt. Division of Oil & Cas Conservation and U.S.G.S. to witness the location and bari]ness of the final plug. Pressure test 7" casing to 3000 psi for 15 minutes. Condition mud to 77-79 pcf. Run a 7" section mill and cut: a minimum /~0' w~_ndow in t:l~(~ 7".,_"'9;,.. casing fro;n ].0,340'-10,380'. Casing collars are loc;~Ccd ac 10,285 feet:, 10',298 feet, 10,341 fee~ and 10,381 feet, .E-log dcpt:l~s. Note: Continua].]ymonitor mud system for possible hig, l~ pre:;:;urc fluid entry during milling and redrilling operations. This interval is normally drilled ~ith 9~ pcf mud. BE PRI:;PAI{I.]D TO SIlUT TIlE WELL IN AXD !{AISE x,,~ ,,- . ...... ~hlCIITS AI'PROPRIATELY 17. Plug window and 7" casing stub with [[cnsified Class "¢;" cement (126 pcf) pre-mixed with 3/4% CFR-2. Puli. out of cement and Braden- head squeeze + 10 cu. ft. Top of plug to be at or above + 10;320 feet. -- .. 18. Clean out cement plug to + 10~346 feet. · · 19. Sidetrack. original hole; precise :directional control is not required. Run single shots as necessary to ensure adequate deviation from orlginal hole. Preferred' direction of move: North. Deviation from present location to be 25-50 feet. '20. Drill 6" hole to + 10~840 feet (depth equivalent to 10~840 feet in SCU .41--9 original hole). 21. Condition hole for logs. Obtain ½ gallon sample of drilling fluid prior to pulling out of hole. '-' 22. Run Dr~sser Atlas. Dual..Induction .Focused log with -SP and GR. A0 Run linear scale for 2" DIFL and logorithmic for 5" DIFL B. Use + 10 ~JV SP scale and 0-50 ohm-meters for the linear DIFL. .. C. Use'O-100 GR scale. 23. Condition hole to run 5" liner. 24. Run and cement approximately 700 feet of 5", 18/j,N-S0 Buttress casing with special clearance PllO couplings at +' 10,840 feet with sufficient dcnsificd Class "G" cement pre:nixed with 3/4% CFR-2 to obtain returns above top of liner. ' 'Equip liner with 5" x 7" Burns liner hanger · grooved for c'ementing. Use float collar and float shoe. Float collar to be one joint above shoe. 25. Clean out cement to float collar. 26. Run Dressc,v Atlas \~BL--CBL-i'Icutron-CCL log a~d Dual Detect:or Nct, t:ron .. Lifetin~e - GR log from effective del)th t:o above top of liner l~snger~ Scales lo be j)rovided by Engineering representative on locati'3'n. 2'/ Pressure test 7" casil:~_,, x 7 liner lap 8nd 5" l~l:cr to 3000 psi 11() l)e i:;'.;::,zd cftc.:' [:!:e 1. o~;:; l~ax'e beel~ rt:n. ' I ~ ,. · DRILLING FLUID PROCRA>i SidetraCk of SCU 41-9 - Swanson River :Field Basic Drilling Fluid System Medium treated lignosulfonate mud. Optimum Drilling Fluid Properties - Weight - pcf Viscosity-sec/qt., API Fluid loss cc, API Plastic viscosity cps 2 Yield point lb/100 ft. Gel strength lb/100 ft. pH . -. Calcium ppm Solids content % vol. In:'7"'& 5" While Redrilling 66-68 77-100 43-47 43-47 4-7 4-7 18-24 18-24 8-12 8-12 0-5 10 Max. 9-10 9-10 50 Max 50 Max R em ark s 1. Limit dry jobs to 20 sacks of barite or as directed by Drilling Foreman. 2. Haintain adequate supply of barite and L'CM on location. . During milling and redrilling con'tinually monitor (on.24-hour basis) mud system, for evidence of high pressure water entry. BE PREPARED TO S}IUT WELL IN AND RAISE WEIGHT AS REQUIRED. ~Chevron U.S.A. I~c. : I CO0' I POllflO;l OF STIIUCTUIIE COtITOUII S','/A[ISOi~ RIVER FIELD, ALASKA COI,~TOURS Ot, J TI-tE.H-,i POINT · .S.C.U. 41-9 · TO ACCO:APAt,IY PP~O 316 Ole I" .50 JOIHTS-- SG dOIHTS -- 27 JOINTS -- 18 JO'~HTS-- 12 JOINTS -- 18' JOINTS ; RE ' ; ' !5.00' ;5.95' 15 15 ~5.90'-- 27C 2.30'-- 2715.~8' 3.SOS.S3'---- 55~1.28' 4 I f0.73'-- 'I- I '.23.65: . 45.:"2.61' I' 1 t lO,: o4.12. . . 2.17 · . . LAN DI .... L A .,,~ DI t,10 h':AI;DRF, t. ' l'O K.13. MAtIDR EL · . r-CAt,,',CO 2)%' Mb', I/,At4DREL .. ~CAMCO 2'.,~ MI,l MAIIDREL ,-CAMCO 2~o' Mb1 14AtlOREL >-CAMCO 2?6' MM t~ANDREI_ >-CAMCO £}~,' him ,,,,,"'I,,'DREL 15,00' ..95' 1537.O4' 12,91' 1136. qO' 12.98' 8,.53.25' 12.9.3' 5G9.27' 12.95' 378.93 ' 1.3.01 5813.98' CAMCO "C" SLE-EVE 2,z~' OPE.H-UPWARD I JO;NT 27g" EUE 8RD TUBII,~G HYDRAULIC PACKER 2;~' x 7" I'JOINT 2~0' EUE 8RD TUBING .OTIS "S" NIPPLE'., Position~ I JOINT 2]~" EUE 8RO TUBII';G CAMCO 'C' SLEEVE 2~'OPEN-UPWARD ~.05' ;51.47 ' 6.60' 31.45: .I .BO' 31.50' ;5,05' BAKER BLAST JOIt'ITS 2~",? 8RD 34.86' . -~ ~osl3 18'11 ' ' ' - , ~ ~' i~.:--"~L BRO'.;'N IIR-!G-I PACKER 2]~' ~7" 5.97' . .- 110520751 [ OT,S o NtFFLE, los t~on 2 1.60' 1'--- ..... Ih :' I-':~ ' 'lqSST'10 >--HYuRAJLIC P,,CK,:R ,-,'¢ x 7 1.60' 9oo~ OTIS 'S' NIPPLE Fosition~l F:--~ "' ~ ---~.T~17~t- - ':', ~ I ~ ,.-.~-:.~...'-' I -'..'~- ,~%¢I -~*~:~ ,t ...... ~ ¢o~ ~ .- ~:,.~:,?'.. ~,:.t :""-I:'I~:'~-~' :~ - ..... · '---'-~1'~%'%'~---':--':°~' .... .... ~ ~., ~BAKE_,~ o,OP ¢UU5. A,'~b S-AL~ ,~o.,~,,u~]' 7. o.: . .-.~ ..'.r . ~:::,,~/ / ' ' t t~ ~ ~ ~ ~ It ~ ~ ~ ,?, ,~ ~--t--~---~------'"~'-=-~ .... f'-- ~.' ~ - I , . ' ' * .~P-..~ · '' ' ' .. ' , Z } [ C,3 ~ / j ':.',F~;;'. f - . - .:z ' . I ' ' [-¥[{~ 1' IH ~IOt. E 2:; V[jllT')RI GI~OE i ~:' ; '. ~;-.,-:- ,'.- .. -. ~ I ~ dl'. 2]j'EUK ]'fiG, ~ ~ C~055CN'ER SUDS. --~--~i -: :': .... ~ ::':: :.'I:.-: -:'. ~..: ;> i'-~-'t ..... t'" t'-'t-''~' , . ~:-i- ~-- · ";-/---,- :F.': :- ', ~' ':;'"'f- ~ ...... I ..... 1-'1- '-I-"; ii~_;,_:_~_l~,_:~_:__i ....... .t~_:~_:: .... F--~--~--i TOP O: F~LL 10,~,;8' ' : , -~- , ,', ' ,7, : ,.~- ~ -'t ~:... 1 o: ,,,_~,o ,o,-,:,o.oo' . . .... L.~~'.~--':._~_._I~ /t:~ :;'t___~ .... .u ~2 '~_L_~_~__;~_~__ / ~ .......... ::~-"L--. -- t" "" t/'l-':" ""-'" I - ,--;'~¢-*~:=-~;---+ .... ~--/ I ---' .--~--; .... f-'~'-- I--% I , .~ t ' , , I : ; I I .'~. ..... : · '~'-' '' ~ I I ' S~.'.':2An2 OiL CHECK LIST FOR NEW ?~LL PERMITS Item Approve Date' (1) Fee ~/~<'/t.. ~'?~'~ x 1. e Yes No Is the permit fee attached .......................................... ~. -- / Is well to he located in a defined pool ............................. / Is a registered survey plat attached ................................ Is well located proper distance frcm property line .................. Is well located proper distance from other wells .................... Lease & Well No. ~C~. Remarks 6. Is sufficient undedicated acreage available in this pool ............ 7. Is well to he deviated ............................................ . .~ 8 Is operator the only affected .party ..' . ./' 9. Can permit he approved before ten-day wait ......................... ~--~f~'/~°_~ 10. Does operator haves bond in force .............. . .................. '~1 Is a conservation order needed ............... ' (4) Casg. ~_~ 12. Is administrative approval needed ................................... ~. f 13. Is cor~uctor string provided ........................................ ~ .~ // 14. Is enough cement used to circulate on conductor and surface ......... ~ ~ ~~15.%1~ Will cement tie in surface and intermediate or production strings.. '~--t/'~ Will cement cover all kno~ productive horizons ...... , ............ ~ 17. Will surface casing protect fresh water zones ....................... ~__ ~ 18. Will all casing give adequate safety in collapse, tension and burst..~ (5)B OPE ~ ~~>9. Does BOPE have sufficient pressure rating- Test to 5-000__ ~ A~proval Reccmmended: Additional Requirements: ~ ~ ~ ~-- /og-~ F ~~" Geology: rev: 03/05/80