Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
180-149
Ima,C'"'~, roject Well History File Cover/"-hge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. / ~'~_~ /~/¢ Well History File Identifier Organizing [~Two-~;ided Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED (Scannable) [] Maps: Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds BY: BEVERLY ROBIN VINCENT~ARIA WINDY Project Proofing BY: ~:ti!~F=~ObIN VINCENT SHERYL MARIA WINDY ~- Scanning Preparation c--~ x 30 = Z~ BY: BEVERLY ROBIN(~ SHERYL MARIA WINDY [] Other Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ,., YES Stage 2 IF NO IN STAGE '1, PAGE(S) DISCREPANCIES WERE FOUND: .. YES BY~ BEVERLY ROBIN VINCE~ARIA WINDY (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION iS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES) NO NO RESCANNED BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: ~SI General Notes or Comments about this file: Quality Checked 12/10/02Rev3NOTScanned.wpd • Page 1 of 1 • Maunder, Thomas E (DOA) From: Greenstein, Larry P [Greensteinlp ©chevron.com] Sent: Friday, October 14, 2011 7:31 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA) Cc: Cole, David A; Martin, J. Hal; Lambert, Steve A; Ayer, Phil M; Ross, Gary D; Quick, Mike [ASRC]; Hallett, Trudi R. Subject: 2011 Third Quarter's LTSI Well Monitoring Report Attachments: Master Well List TIO Report 2011 10 01.xls Hi Tom & Jim, Here is the third quarter's report for the LTSI wells utilizing pressure monitoring in lieu of an MIT to determine any mechanical integrity problems. The wells G -29RD, G -27, G -22 & G -5RD have been moved to this LTSI report as their downhole problems (like parted tubing) do not allow a temp survey to be run to the proper depth to confirm water entry into the perfs. As a result, they are all shut -in and will remain so for now. The An -17, An -29, Ba -16 & GPP 33 -14RD wells showed increases in the 13 3/8" annulus, but they all have leveled off lately. Ba -17, after an MIT, was used in August to disposed of some fluids collected during the well kill operations on Baker. It may be used again in October for fluids collected during a well abandonment operation. I have left this well on the LTSI well list because after this usage, the well will revert to being shut -in for the foreseeable future. All the pressures seen during the usage in August looked appropriate and the well appears to have maintained its mechanical integrity throughout the disposal operations. The general pattern of stable or slowly rising pressure trends continued this month for the Baker & Dillon wells on this list with the only other pressure anomaly related to the seasonal trend in pressures apparent in Ba -15RD. The well kill operations performed on the Dillon platform in August show up very clearly on the plots. Other than the noted issues, there doesn't appear to be any wells that show indications of any well integrity problems. Larry 10/14/2011 Plot Pressure Ake vs Time - Well GP 33 -14RD • 600 - 200 180 •9 5/8" 500 13 3/8" 1 20' 160 •Tubing •Vol 33 -14 140 400 -- 120 d m 300 — 10i' y m a 80 200 — - 60 `a ,1 40 100 20 0 % 0 01 0 CO CT) N CO r o 0 o 0 0 0 0 0 0 p 0 0 Date 13 3/8" 20" TdRIPVINVIIIM TIO Report 10/01/11 395 6 0 0 09/30/11 - i 400 5 0 0 Data Sheet 09/29/11 . 20 395 6 0 0 09/28/11 120 395 5 0 0 09/27/1 120 395 5 0 0 GP 33 -14RD 09/26/11 120 390 5 0 0 09/25/11 120 390 6 0 0 09/24/11 120 390 6 0 0 INJECTION 09/23/11 120 390 6 0 0 09/22/11 120 390 6 0 0 09/21/11 120 390 6 0 0 Permit # 1801490 09/20/11 120 390 6 0 0 09/19/11 120 390 6 0 0 09/18/11 I, 20 390 6 0 0 Sundry # 302 -401 09/17/11 X20 390 5 0 0 09/16/11 j20 390 5 0 0 09/15/11 i.20 390 6 0 0 API # 50- 733 - 20079 -01 09/14/11 '20 390 5 0 0 09/13/11 : 20 385 6 0 0 09/12/11 120 385 7 0 0 04/01 /2011 to 10/01/2011 09/11/11 -. 120 385 7 0 0 09/10/11 i 10 385 7 0 0 09/09/11 - 115 385 7 0 0 09/08/11 110 380 7 0 0 09/07/11 110 380 6 0 0 09/06/11 - - 120 380 7 0 0 09/05/11 a 0 370 6 0 0 09/04/11 380 5 0 0 09/03/11 380 6 0 0 09/02/11 , . .- ' • 11 380 6 0 0 09/01/11 `" 120 380 6 0 0 08/31/11 20 375 6 0 0 08/30/11 120 375 7 0 ` 0 08/29/11 ,. u e 375 7 0 0 08/28/11 375 6 0 0 08/27/11 370 7 10/14/2011 8:45 AM - TIO Reports 7e.xls J J Dolan Master Well List TIO Report 2011 10 01.xIs GP 33 -14RD 2011 First Quarter's LTSI Well Miring Report • Page 1 of 1 Maunder, Thomas E (DOA) From: Greenstein, Larry P [Greensteinlp @chevron.com] Sent: Thursday, April 14, 2011 7:20 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA) Cc: Cole, David A; Martin, J. Hal; Lambert, Steve A; Ayer, Phil M; Ross, Gary D; Quick, Mike [ASRC] Subject: 2011 First Quarter's LTSI Well Monitoring Report Attachments: Master Well List TIO Report 2011 03 31.xls Hi Tom & Jim, Here is the first quarter's report for the LTSI wells utilizing pressure monitoring in lieu of an MIT to determine any mechanical integrity problems. Drilling did some diagnostic pressure bleed downs on the GPP 33 -14RD well in February looking for any integrity concerns. We are monitoring the pressures and there does appear to be some outside pressure coming into the 13 3/8 ", but otherwise no communication between strings is indicated. The An -17 well is still behaving oddly. The 9 5/8" has settled down and doesn't seem to be tracking the 13 3/8 ", but now the 20" is increasing. As we watch the pressures, we'll see where they stabilize and see what that tells us. There are some interesting pressure movements with this well, but the pressures aren't high, just moving 'more than they have in the past. The Baker and Dillon wells have remained fairly stable since drilling completed the bleed downs and well kill operations last year. The recorded pressures for most all the wells remain fairly stable. Other than the noted issues, there doesn't appear to be any wells that show indications of any well integrity problems. Larry «Master Well List TIO Report 2011 03 31.xls >> 4/14/2011 Plot Pressure & Rate vs Time - Well GP 33 -14RD 600 200 180 ''" 9 5/8" 500 13 3/8" ..— 20" 160 Tubing Vol 33 -14 140 400 120 v 3 v, 300 - -... 10i : m a 80 200 60 40 100 _... - � � 1f 1 •A-0 20 0, 0 0 0 0 0 N N N N c N N o co a a M o _ n o 0 Date 13 3/8" 20' _ TIO Report 03/31 /11 210 1 03/30/11 210 1`i' Data Sheet 03/29/11 205 1 ='- 03/28/11 200 1 200 1 " GP 33 -14RD 03/26/11 200 1 1' 03/25/11 190 1'' 03/24/11 190 16 INJECTION 03/23/11 190 16 03/22/11 190 16 03/21/11 190 16 Permit # 1801490 03/20/11 185 16 03/19/11 180 16 03/18/11 175 16 Sundry # 302 -401 03/17/11 175 16 03/16/11 170 16 03/15/11 130 170 16 API # 50- 733 - 20079 -01 03/14/11 ;130 165 16 03/13/11 160 16 03/12/11 160 16 09/29/2010 to 03/31/2011 03/11/11 160 16 03/10/11 155 16 03/09/11 150 15 03/08/11 150 17 03/07/11 150 16 03/06/11 140 16 03/05/11 130 16 03/04/11 135 16 03/03/11 130 15 1 03/02/11 130 16 03/01/11 125 15 02/28/11 120 14 02/27/11 120 14 02/26/11 120 14 02/25/11 110 14 02/24/11 100 14 4/14/2011 9:35 AM - TIO Reports 7e.xls J J Dolan Master Well List TIO Report 2011 03 31 (2).xls GP 33 -14RD :E: <I N t<) ') (S) \J) (S) I .... (S) Z :J "1 ~ ~e 0.. 0.. U (S) (f) Z ... ~ I- <I · From: ~ · Fax # : 907.776.6654 ~ \ <?to ¿ ~ l{ q · Copies including ô~.... \O¡ (l.'\> coversheet: · \J) (I- :e (S) (1\ To: -- 1-1...... ~ Pc:. r . I - --- - ..- . Fax #: 27 ;-ief'J~~ -.' ~Ia$ka Od & Gas Cons. Commiss¡n JlmchafllOf' t<) ') \J) \J) .... (S) . 0.. Granite Point Platform RECEIVED f; 1 2006 1§1r\e\~ r, ~,;;.' JUN-01-06 05:34 AM MARK. ATKINS0 GPP 907 776 6653 P.04 ¡ . , " e - I I i Granite ~olnt Platform ì Well 33-14 -l'8Hures Date May-OS I Pate Tbl PreM. 9 618" Csa Preu. 13318" CSa P...... Bbl'. InJeçted comments 1 ' 480 410 405 0 2' 460 410 400 0 i 3, 460 410 400 0 4' 460 410 400 0 ! 5 460 410 400 0 6 460 406 400 0 , 7 455 405 400 0 i , 8 ' 450 400 400 0 ¡ 9 ' 455 405 405 0 : 10 455 405 405 0 ! 11 ' 452 405 405 0 I 12, 450 405 405 0 : 13 450 405 405 0 i 14 450 405 405 0 : 15 450 405 400 0 16 450 405 400 0 i 17 450 405 400 0 I 18 450 403 400 0 ! 19, 450 402 400 0 ; 20 450 403 400 0 i 21 450 400 400 0 ¡ 22 450 400 400 0 i 23 450 400 400 0 ! 24 450 400 400 0 L 25 450 400 400 0 i 26 450 400 400 0 27 450 400 400 0 : 28 450 400 400 0 I 29 450 400 400 0 :30 450 400 400 0 I 31 450 400 400 0 Total, 4027 12513 12435 0 0 ~Vg, 45 .483871 403.6451613 401.1290323 0 #CIV/O! iopl~to T ilT1 Maunder/Jim Regg; Fax 276-7542 ; i , , ' ; !., t: , , j " ! t <6Ô- t '+9 • • Chevron Steve Lambert Union Oil Company of California 11101. Reservoir Engineer P.O. Box 196247 Anchorage, AK 99519 -6247 Tel 907 263 7658 Fax 907 263 78484 7 Email salambert@chevron.com titMita APR 1 2011 REC E October 19, 2005 T 7:N5 Mr. Tom Maunder no Collo. Alaska Oil and Gas Conservation Commission t iavka t) 333 W. 7th Ave # ntolage Anchorage, Alaska 99501 -3539 CONTINUATION OF INJECTION WELL SHUT -IN GRANITE POINT FIELD WELL NO. 33 -14RD PERMIT NO. 180 -149 GRANITE POINT PLATFORM GRANITE POINT FIELD Dear Tom: Per the attached Assessment of Well Utility, for Granite Point Well No. 33 -14RD (Permit No. 180 -149), Granite Point Field, Chevron submits the following information to demonstrate the stability of the downhole fluids in the wellbore. Well No. GP 33 -14RD is an injector which was shut -in in November 1998 due to a failed MIT. The attached temperature survey from 8/28/04 shows a uniform and steady temperature gradient indicating no movement of the downhole fluids. Chevron requests that the AOGCC, upon agreement with the temperature survey analysis, sign and date the concurrence line below. Please fax a signed copy to Unocal (fax 263- 7847). Chevron will continue to monitor and record daily tubing and casing pressures on the well and provide a report to the AOGCC on a monthly basis. A temperature survey will be run every two years to determine the stability of the fluids in the wellbore. Please call me at (907)263 -7658 if you have any questions. Best regards, Steve Lambert cc: Bob Fleckenstein Attachments Concurrence: Date: Union Oil Company of California / A Chevron Company http: / /www.chevron.com STATE OF ALASKA • s.. ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATION f ission 1. Operations Abandon H Repair Well H Plug Perforations H Stimulate Li Other' 1± - Continue Shut -In Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator Union Oil Company of California (Unocal) 4. Current Well Class: 5. Permit to Drill Number: Name: Development ❑ Exploratory ❑ 180 -149 3. Address: P.O. Box 196247 Anchorage, AK 99519 Stratigraphic ❑ Service 0 6. API Number: 50- 733 - 20079 -01 7. KB Elevation (ft): 9. Well Name and Number: 95' MSL GPP 33 -14 RD 8. Property Designation: 10. Field /Pool(s): UNION -MOBIL STATE #1 Granite Point / Middle Kenai 11. Present Well Condition Summary: Total Depth measured 11420 feet Plugs (measured) true vertical 10666 feet Junk (measured) Effective Depth measured 10266 feet true vertical 9546 feet Casing Length Size MD ND Burst Collapse Structural Conductor Surface 561 18 561 560 Intermediate 4012 13 3/8 4012 3780 Production 9164 9 5/8 9164 8457 Liner 1593 7 8912 -10505 8217 -9785 942 5 10468 -11410 9748 -10657 Perforation depth: Measured depth: various 10000 - 11246 True Vertical depth: various 9281 - 10503 Tubing: (size, grade, and measured depth) 3 1/2 - -- 2 3/8 9.2# N -80 / 4.7# N -80 10387 / 10842 Packers and SSSV (type and measured depth) Baker "FB -1" @9898', Baker "FB -1 " @ 10,201', Baker "FA -1" @10,832' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: no water injection Subsequent to operation: no water injection 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Temp Survey Exploratory I=1 Development ❑ Service Q Daily Report of Well Operations 16. Well Status after proposed work: Oil El Gas ❑ WAG El GINJ ❑ WINJ 0 WDSPL El 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Steve Lambert 263 -7658 Printed Name Steve Lambert Title Reservoir Engineer Signature Phone 263 -765 RBDMS BFI. OCT 0 1 Dat e 10/20/2005 Form 10 -404 Revised 04/2004 0RIGINAL Submit Original Only / . • Unocal Alaska Resources Unocal Corporation • 909 West 9th Avenue, P.O. Box 196247 Anchorage, Alaska 99519 -6247 Telephone (907) 276 -7600 _ ) UNOCAL Steve Lambert Reservoir Engineer September 6, 2005 Mr. Tom Maunder ` Alaska Oil and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501 -3539 — ASSESSMENT OF WELL UTILITY UNION -MOBIL STATE #1 WELL NO. 33-14RD PERMIT NO. 180-149 SUNDRY APPROVAL NO. 302-401 GRANITE POINT PLATFORM GRANITE POINT FIELD Dear Tom: C. ) In response to a request by the AOGCC on a Sundry Approval (No. 302 -401) for Granite Point Well No. 33 -14RD (Permit No. 180 -149), Granite Point Field, Chevron submits the following information concerning an action plan for this well. Well No. GP 33 -14RD, an injector which was shut -in in October 1999 due to a failed MIT, will continue to be considered as a future workover candidate. Please note that this information has been reported to the AOGCC (Mr. Jack Hartz) yearly on an annual shut -in well report. However, in the event that this report is not sufficient as a response to the sundry or has not been reaching you, we are additionally notifying you through this submittal. Attached for informational purposes are copies of the annual shut -in reports for 2002, 2003, and 2004 mentioned above, a copy of the sundry, and a schematic. Chevron will monitor and record daily injection rates and tubing and casing pressures on the well and provide a report to the AOGCC on a monthly basis. A temperature survey will be run every two years to insure that fluids continue to be contained within the completion interval. Please call me at (907)263 -7658 if you have any questions. Sincerely, . Dcai Steve Lambert JHM:jlI Attachments O:\OOE \OOEFields \GPF\Granite Point \Wells \Gp 33 -14 \Gp 33- 14RDInj \State_Forms \Correspondence \GP 33 -14RD Sundry Response Sep05.doc S S Unocal I WeII:IGPP 33 -14RD I Field:IGranite Point 18-28-2004 I Pressure (psia) 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 0 ' 1000 Pressure-Temperature Profile 1. Going in hole 2. Shut -In 2000 3000 4000 w d 5000 2 - 6000 c. 01 7000 8000 9000 10000.. C - 11000 i 50 60 70 80 90 100 110 120 130 140 150 160 170 Temperature (Deg. F) —Pressure — Perfs 13 3/8" 9 5/8" 7" —TBG 5" —Temp 8 -28 -04 • • 'Unocal I Well:'GPP 33 -14RD I Field:IGranite Point 18-28-2004 I Pressure (psia) 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 0 Pressure- Temperature Profile 1. RIH Hole to 9430' TVD 2. Shut -In 1000 -- — 2000 3000 - 4000 a) ( 1) > 5000 - I- - - a a) irD 6000 7000 8000 N 9000 10000 I I I I I I I t 50 60 70 80 90 100 110 120 130 140 150 160 170 Temperature (Deg. F) Pressure — Perfs 13 3/8" —9 5/8" 7 —TBG 5" Temperature III Granite Point UNOCAL • Well # 33 -14RD Injector Completed 3/6/81 RKB to TBG Head = 38.20' CASING AND TUBING DETAIL SIZE WT GRADE CONN ID TOP BTM. Tree connection: 13 -3/8" 61.0 K -55 Butt. LT &C 12.515 Surf 4012' 9 -5/8" 40 & 43.5 N -80 & S -95 Butt. LT &C 8.755 Surf 9164' 7" 29 P -110 Butt. LT &C 6.184 8912' 10,505' 5" 18 N -80 Butt. LT &C 4.276 10,468' 11,410' Tubing: 3 -1/2" 9.2 N -80 Butt 2.992 0' 10,387' L 2 -3/8" 4.7 N -80 Butt 1.995 10,387 10,842' JEWELRY DETAIL Bad Csg NO. Depth ID Item 4003' - 4121. 38 OCT 2 Stage Unihead Tbg Hanger Sgz'd w/ 400 sx ofcl 'G ", 1 9859' Otis "XA" Sliding Sleeve tested to 1300 2 9898' 3.00 Baker Model "G -22" Locator w/ 80-40 Seal Assy, 17.45 Ing psi on 2/2881 - . 3 9899' Baker Model "FB -1" Ret. Prod. Pkr. size 85-40 4 9902' Millout Ext. w/ 5" 8rd X 3 -1/2" Butt. XO L , 5 10,015' 2.867 3 -1/2" Camco MMGW Mandrel w/ "RW" Regulator. 6 10,085' 3 -1/2" Camco MMGW Mandrel w/ "Riked" Dummy. 0 1 7 10,200' Baker Model "G -22" Locator w/ 80-40 Seal Assy, 10.45 Ing 2 7 10 3 8 ,201' Baker Model "FB -1" Ret. Prod. Pkr. size 85-40 I 4 9 10,204' Millout Ext. w/ 5" 8rd X 3 -1/2" Butt. XO 5 10 10,309' 3 -1/2" Camco MMGW Mandrel w/ "RW" Regulator. C -2 1 10,347' 3 -1/2" Camco MMGW Mandrel w/ "Riked" Dummy. g 1 2 10,386' Crossover, 3 -1/2" Butt Box X 2 -3/8" Butt Pin 7 13 10,797' Otis "X" Nipple _-_ 8 14 10,829' Baker Model "G" Locator w/ 20 -25 Seal Assy, 10.45 Ing ir 9 15 10,832' Baker Model "FA -1" Ret. Prod. Pkr. 16 10,841' Mule Shoe 10 btm Si = C - gi 11 Fill Tagged on 5/5/1999 @ 10,266 with 2 "GR 12 v . . FISH: (cleaned out down to 10,239' WLM as of 12/10/98 w/ sl) _- C -5 2- 11/16" Swedge, Spang jars, hyd. jars, 10,400' of wire 10/10/88 f/ XO @ 10,387' to G a (found notation on report a plan to pump acid down tbg to erode 10,239' 7 wire on 10/18/88) C -5 • • 13 PERFORATION HISTORY 14 Interval Accum. ZilZ 15 Date Zone Top Btm Amt spf Present Condition ' 2/25/81 9,250' 9,252' 2' 2' Sqz Perfs f/ Bond 3/2/81 C2 10,000' 10,044' 44' 4' Open f/ Injection 16 2/24/81 10,042' 10,044' 2' 4' Sqz Perfs f/ Bond C -6 3/1/81 C5 10,390' 10,455' 65' 4' Open f/ Injection 3/1/81 C5 10,490' 10,585' 95' 4' Open f/ Injection C -7 3/1/81 C5 10,716' 10,756' 40' 4' Open f/ Injection _ 3/1/81 C6 11,044' 11,074' 30' 4' Open f/ Injection = C -7 3/1/81 C7 11,104' 11,194' 90' 4' Open f/ Injection 3/1/81 C7 11,230' 11,246' 16' 4' Open f/ Injection G � KB ELEV: = 105' PBTD = 11,410'TD = 11,420' MAX HOLE ANGLE = 32° GP_33 -14RD 19990505.doc DRAWN BY: SLT 5/5/1999 ') Unocal Alaska Resourc, ) Unocal Corporation 909 West 9th Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 Telephone (907) 276-7600 UNOCALe ~,:;, r2~ r' E· ß '\. l E r~) ~, ,_ L..;n \'~J "I ¢¡~ " .""'" p OJ " ' Steve Lambert Reservoir Engineer September 6, 2005 ('" ". "f¡;l,ï ~',I::.i.:", :\;\"¡""&',),o!III lì.l:1 !:) r' :<~ì. ();Jf~, .....(~¡'~ ~í ,. ~.,. .:I''', , I .,~1JI'm"'i'I\ \.,!':J tK \.';\_ A;'Ki;~>i<}f;~ I. ... .\e~ ~ï \' . t;', -,'. _ ' or'. .t\"~ I,j--~ ~(~, .l-~~t" ~~~, "~" \t~ (\ , " " : r'O 'Qù€.cJ \'''\C''' " C.O~~,(~~\Q~\ " G~?r ~ ~ ~O\;S~ ~t\h~~ ,\~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501-3539 ASSESSMENT OF WELL UTILITY UNION-MOBIL STATE #1 WELL NO. 33-14RD r PERMIT NO. 180-149 SUNDRY APPROVAL NO. 302-401 GRANITE POINT PLATFORM GRANITE POINT FIELD (' C I!) '11 ~.' î2 0 I'Jr.; ,'»1:.1 Jl.~) ..;tJ Dear Tom: In response to a request by the AOGCC on a Sundry Approval (No. 302-401) for Granite Point Well No. 33-14RD (Permit No. 180-149), Granite Point Field, Chevron submits the following information concerning an action plan for this well. Well No. GP 33-14RD, an injector which was shut-in in October 1999 due to a failed MIT, will continue to be considered as a future workover candidate. Please note that this information has been reported to the AOGCC (Mr. Jack Hartz) yearly on an annual shut-in well report. However, in the event that this report is not sufficient as a response to the sundry or has not been reaching you, we are additionally notifying you through this submittal. Attached for informational purposes are copies of the annual shut-in reports for 2002, 2003, and 2004 mentioned above, a copy of the sundry, and a schematic. Chevron will monitor and record daily injection rates and tubing and casing pressures on the well and provide a report to the AOGCC on a monthly basis. A temperature survey will be run every two years to insure that fluids continue to be contained within the completion interval. Please call me at (907)263-7658 if you have any questions. Sincerely, ~~X~ Steve Lam bert JHM:jll Attachments O:\OOE\OOEFields\GPF\Granite Point\Wells\Gp 33-14\Gp 33-14RDlnj\State_Forms\Correspondence\GP 33-14RD Sundry Response Sep05.doc UNION OIL COMPANY OPERATED PROPERTIES WELL DATA FIELD 1Uö~~;-A(.~:.nmllLIJ SUMMARY äðif_)ííüj~~~)r lUI [I SUMMARY ~î.~JüjUD1IJì~~_~l m SUMMARY WELL 8RD 9RD ISRD 18 31 32 NO wELLS ~~ 4 5 6 7 8RD 9RD2 11 12 NO WELLS æJ..._~ iii! 12-24 22-13RD2 31-13 31-14RD#2 33-14RD 24-I3RD NO WELLS -~~ Informatloa for AOGCC on Shut-In Wells Reg 10 ACC 15.115 DATE Mechanical Cond~tion SHUT-IN Dec-92 No known damage Qct-96 Communication between strings Mar..()() Tubing to Casing communication Oct-94 No known damage Dec-97 No known damage Jan..()() No known damage Ju1-98 Hydraulic pump firilure May-76 No known damage Feb-88 No known damage Dec-84 No known damage Feb-87 Bad Casing Feb-87 No known damage Jun-87 No known damage Joo-87 No known damage Nov-82 No known damage Oct..()() Tubing to Casing Communication Jun-97 No known damage Jul-98 No known damage Oct-99 Tubing and Casing Leaks Mar"()() Tubing Plugged Page 2 Why weD was Shut-In Stopped taking water Mechanical integrity problem Failed MIT (Temperature anomaly) Gas well that watered out Produced water Depleted No production Stopped producing Failed WO, no production No injection on platfonn Noi~ectiononpmtfonn No injection on pmtfonn No injection on platfonn No injection on platform Won't take water Failed MlT (temperature anomaly) High Water Cut High Water Cut Mechanical integrity problem Scheduled for cleanout Future UtiHtyofWeD Potential WO candidate Potential WO or Coil tubing c1eanout Injector Potential WO candidate Potential redrill candidate into Hemlock -' Convert to Rod Pump êompletion. Potential redrill candidate. Potential gas producer. Potential redrill candidate Potential to convert to E & F producer Potential to convert to E & F producer Potential redrill candidate Potential redrill candidate ~ Potential coil tubing clean out and return to iniection. IDjector Convert to water injector Possible conversion to water injector. Potential WO candidate Potential WO candidate Downloa'CSteveMcMaines.XLSSIIUUn_ WeB_Status UNION OIL COMPANY OPERA TED PROPERTIES WELL DATA FIELD WELL AL - DILLON 2RD 3 4 5 6 7 8RD 9RD2 11 12 13 14 15 16 17 18 SUMMARY NO WELLS --- 12-24 22-13RD2 31-13 31-14RD#2 33-14RD 24-13RD SUMMARY NO WELLS - Information for AOGCC on Shut-In Wells Reg 20 ACC 25.115 DATE Mechanical Condition SHUT-IN Dec-02 No known damage Dec-02 No known damage Jul-98 Hydraulic pump failure May-76 No known damage Feb-88 No known damage Dec-84 No known damage Feb-87 Bad Casing Feb-87 No known damage Jun-87 No known damage Jun-87 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Nov-82 No known damage Oct-OO Tubing to Casing Communication Jun-97 No knoWÍl damage Jul-98 No known damage Oct-99 Tubing and Casing Leaks Mar-OO Tubing Plugged Why well was Shut-In Platform shut-in -- uneconomic Platform shut-in -- uneconomic No production Stopped producing Failed WO, no production No injection on platform No injection on platform No injection on platform No injection on platform No injection on platform Platform shut-in -- uneconomic Platformshu~in--uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Won't take water Failed MIT (temperature anomaly) High Water Cut High Water Cut Mechanical integrity problem Scheduled for clean out Page 3 tMA;tmflrlO1/ 6ft ' Future Utility of Well None None None None None None None None None None None None None None None None ~' '-" Potential coil tubing clean out and return to injection. Injector Convert to water injector Possible conversion to water injector. Potential WO candidate Potential WO candidate WeILCouncShuUn_Status_2004_Complete.XLSShuUn_ Well_Status UNION OIL COMPANY OPERA TED PROPERTIES WELL DATA FIELD WELL AL - DILLON 2RD 3 4 5 6 7 8RD 9RD2 11 12 13 14 15 16 17 18 SUM:MARY NO WELLS 11-24 12-24 22-13RD2 31-13 31-14RD#2 33-14RD 24-13RD MUCI-2 GP52 GP55 SUMMARY NO WELLS - Infonnation for AOGCC on Shut-In Wells Reg 20 ACC 25.115 DATE Mechanical Condition SHUT-IN Dec-02 No known damage Dec-02 No known damage Jul-98 Hydraulic pump failure May-76 No known damage Feb-88 No knoWn damage Dec-84 No known damage Feb-87 Bad Casing Feb-87 No known damage Jun-87 No known damage Jun-87 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Dec-02 No known damage Sep-97 Corroded tubing mostly pulled Nov-82 No known damage Oct-OO Tubing to Casing Communication Jun-97 No known damage Jul-98 No known damage Oct-99 Tubing and Casing Leaks Mar-OO Tubing Plugged Dec-03 Tubing to Casing Communication Aug-97 No known damage Aug-97 No known damage Unsuccessful workover, perfs cemented Possible redrill to the C-5 sand Won't take water Potential coil tubing clean out and return to injection. Failed MIT (temperature anomaly) Injector High Water Cut Convert to water injector High Water Cut Possible conversion to water injector. Mechanical integrity problem Potential WO candidate Scheduled for cleanout Potential WO candidate Questionable value with limited H2O Possibly restore injection at a later date. Drilling susp due to wet GP-53 well Shallow depth allows flexibility for future redrills Drilling susp due to wet GP-53 well Shallow depth allows flexibility for future redrills Why well was Shut-In Platform shut-in -- uneconomic Platform shut-in -- uneconomic No production Stopped producing Failed WO, no production No injection on platform No injection on platform No injection on platform No injection on platform No injection on platform Platform shut-in -- uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Platform shut-in -- uneconomic Page 4 ?ff~~ Future Utility of Well None None None None None None None None None None None None None None None None ~ -' if V' WeICCouncShuUn_Status_Jan05 Rev'xLSShuCIn_ WelCStatus ` U N O CA 76 • • Granite Point Well # 33 -14RD Completed 3/6/81 RKB to TBG Head = 38.20' CASING AND TUBING DETAIL Tree connection: SIZE WT GRADE CONN ID TOP BTM. 13 -3/8" 61.0 K -55 Butt. LT &C 12.515 Surf 4012' 9 -5/8" 40 & 43.5 N -80 & S -95 Butt. LT &C 8.755 Surf 9164' 7" 29 P -110 Butt. LT &C 6.184 8912' 10,505' 5" 18 N -80 Butt. LT &C 4.276 10,468' 11,410' Tubing: 3 -1/2" 9.2 N -80 Butt 2.992 0' 10,387' L '7_1/R" a 7 N_Rn n,,tt 1 QQG I n 2 R7 I n Rd')' JEWELRY DETAIL Bad Csg NO. Depth ID Item 4003' - 4121'. 38 OCT 2 Stage Unihead Tbg Hanger Sgz'd w/ 400 sx of cl "G ", 1 9859' Otis "XA" Sliding Sleeve tested to 1300 psi on 2/28/81 2 9898' 3.00 Baker Model "G -22" Locator w/ 80 -40 Seal Assy, 17.45 ing - 3 9899' Baker Model "FB -1" Ret. Prod. Pkr. size 85 -40 4 9902' Millout Ext. w/ 5" 8rd X 3 -1/2" Butt. XO L 5 10,015' 3 -1/2" Camco MMGW Mandrel w/ "RW" Regulator. 6 10,085' 3 -1/2" Camco MMGW Mandrel w/ "Riked" Dummy. - 1 2 r-2- 7 10,200' Baker Model "G -22" Locator w/ 80 -40 Seal Assy, 10.45 Ing :•: 3 8 10,201' Baker Model "FB -1" Ret. Prod. Pkr. size 85 -40 ir 4 1 9 10,204' Millout Ext. w/ 5" 8rd X 3 -1/2" Butt. XO 5 10 10,309' 3 -1/2" Camco MMGW Mandrel w/ "RW" Regulator. • C - 11 10,347' 3 -1/2" Camco MMGW Mandrel w/ "Riked" Dummy. 6 12 10,386' Crossover, 3 -1/2" Butt Box X 2 -3/8" Butt Pin 7 13 10,797' Otis "X" Nipple .-2 8 14 10,829' Baker Model "G" Locator w/ 20 -25 Seal Assy, 10.45 ing 9 15 10,832' Baker Model "FA -1" Ret. Prod. Pkr. ir 16 10,841' Mule Shoe 10 btm HI C -5 PI 11 Fill Tagged on @ 12 . FISH: = 10/10/88 2- 11/16" Swedge, Spang jars, hyd. jars, 10,100' of wire f/ XO @ 10.387' to 350' = C -5 12/10/98 Finished retrieving approximately 10,200' of wire and scale, Mooed 10 739' w1m = C -5 .. 13 PERFORATION HISTORY 14 Interval Accum. A -- J 15 Date Zone Top Btm Amt spf Present Condition 2/25/81 9,250' 9,252' 2' 2' Sqz Perfs f/ Bond 3/2/81 C2 10,000' 10,044' 44' 4' Open f/ Injection 16 c 2/24/81 10,042' 10,044' 2' 4' Sqz Perfs f/ Bond - C -6 3/1/81 C2 10,390' 10,455' 65' 4' Open f/ Injection 3/1/81 C5 10,490' 10,585' 95' 4' Open f/ Injection - C-7 3/1/81 C5 10,716' 10,756' 40' 4' Open f/ Injection - C -7 3/1/81 C6 11,044' 11,074' 30' 4' Open f/ Injection 3/1/81 C7 11,104' 11,194' 90' 4' Open f/ Injection G 3/1/81 C7 11,230' 11,246' 16' 4' Open f/ Injection KB ELEV: = 105' PBTD = 11,410'TD = 11,420' MAX HOLE ANGLE = 32° 33-1 4rdHist 12- 10 -98. doc REVISED: 9/1/2005 DRAWN BY: SLT STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casing: Repair well: Plugging: Time extension: X Stimulate: Change approved program: Pull tubing: Variance: Perforate: Other: 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) Unocal Alaska Resources Development: KB 95' MSL feet 3. Address Exploratory: 7. Unit or Property name Box 196247 Stratigraphic: UNION-MOBIL STATE #1 Anchorage, Alaska 99519 Service: X 4. Location of well at surface 8. Well number 2371'S & 1258'E of the NW corner, Sec.13, T10N, R12W, SM. GP 33-14RD At top of productive interval 9. Permit number 1604'N & 1728'W of the SE corner, Sec. 14 T10N, R12W, SM. 80-149 At effective depth 10,266' 10. APl number 1580' N & 1734' 'W of the SE corner, Sec. 14 T10N, R12W, SM. 50- 733-20079-01 At total depth 11. Field/Pool 1500'N & 1507'W of theSE corner, Sec. 14 T10N, R12W, SM. Granite Point/Middle Kenai 12. Present well condition summary Total depth: measured 11420 feet Plugs (measured) true vertical 10666 feet Effective depth: measured 10,266' feet Junk (measured) true vertical 9,546' feet Casing Length Size Cemented Measured depth True vertical depth Surface 561' 18" 736sx 0'-561' 0'-560' Intermediate 4,012' 13.375" 2250sx 0'-4012' 0'-3780' Production -, 9,164' 9.625" ~ 0'-9164' 0'-8457' Liner 1593' 7" 400sx 8912'- 10505' 8217'-9785' 942' 5" 200sx 10,468'- 11410' 9748'- 10657' Perforation depth: measured 11246-11230 11194-11104 11074-11044 10756-10716 10585-10490 10455-10390 10044-10000 true vertical 10503-10488 10453-10368 10339-10311' 10033-9994 9864-9771 9735-9670 9325-9281 Tubing (size, grade, and measured depth) 3.5" N-80 10,387' 2.375" N-80 10,842' Packers and SSSV (type and measured depth) Baker "FB-1" @9898' Baker "FB-1" @ 10,201' Baker "FA-l" @ 10,832' 13. Attachements Description summary of proposal: Detailed operations program: BOP sketch: 14. Estimated date for commencing operation 15. Status of well classification as: N/A 16. If proposal well verbally approved: Oil: Gas: Suspe~., .~ 2002 Name of approver Date approved Service: X 17. I hereby certify th~oing is J,-um~n~ect to the best of my knowledge. Signed: T}tle: Waterflood technician Date: 12127/2002 [ / FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness IApproval No. Plug integrity BOP Test~ Location clearance~ Integrity Te_st_____ Subsequent form required 10-~. ~:~-~, ~'~.~,,,~, Mechanical Approved by order of the Commissioner Commissioner Date Form 10-403 Rev 06/15/88 ", REIDMS BFL SUBMIT IN T ~TE Granite Point Well # 33-14RD Injector Completed 3/6/81 RKB to TBG Head = 38.20' Tree connection: 3 5 KB ELEV: = '105' PBTD = lt,410'TD = 11,420' MAX BOLE ANGLE = 32° C-2 C-5 C-5 C-5 CASING AND TUBING DETAIL SiZE WT GRADE CONN iD TOP BTM. 13-3/8" 610 K-55 Butt LT&C 12515 Surf 4012' %5/8" 40 & 435 N-80 & S-95 Butt LT&C 8.755 Surf 9164' T' 29 P-I I0 Butt LT&C 6.184 8912' 10,505' 5' 18 N-80 Butt LP&C 4.276 10.468' I 1,410' Tubing: 3-1/2" 92 N-80 Butt 2992 0' 10.38T 2-3/8" 47 N-80 Butt 1995 10,387 1(L842' NO. 38 i 9859' 2 9898' 3 9899' 4 9902' 5 10,015' 6 10~085' 7 10,200' 8 10,20I' 9 10,204' I0 10,309' I1 ~0,347' 12 10,386' 13 10,797' 14 10.829' 15 ~0,832' 16 I0,841' btm JEWELRY DETAIL LD Item 3 00 2867 OCI' 2 Stage Unihead Tbg Hanger ()tis "XA' Sliding Sleeve Baker Model "G-22" [ ocator w/80-40 Seal Assy, 1745 lng Baker Model "FB-I" Ret Prod Pkr size 85-40 Miliout Ext w/5" 8rd X 3-1/? Butt XO 3-I/2" Camco MMGW Mandrel w/'IiW" Regulator 3-I/2" Canlco MMGW Mandrel w/'Riked' Dummy Baker Model "G-22" Locator w/80-40 Seat Assy, 1045 lng Baker Model 'TB-I" Ret Prod Pkr size 85-40 Millom Ext w/5" 8rd X 3-1/2" Butt XO 3-I/2" Camco MMGW Mandrd w/"RW' Regulator 3-I/2" Camco MMGW Mandrel w/'~Riked" Dummy Crossover, 3-1/2" Butt Box X 2-3/8" Butt Pin Otis '~X" Nipple Baker Model 'G" Locator w/20-25 Seal Assy, 1045 lng Baker Model "FA-I" Ret Prod Pk~ Mule Shoe Fill Tagged on 5/5/1999 FISH: cleaned out down to 10,239' WLM as of' I2/10/98 w/si) 2-11/16" Swedge. Spangjars, hyd. jars, 10.400' of wire 10/10/88 (fbund notation on report a plan to pump acid down 1bg to erode wire on 10/18/88 ) (¢ 10,266 with 2"GR 1; / XO ~ t0,387' to t0,239' PERFORATION HISTORY Interval Accum. Date Zone Top Btm Amt spt Present Condition 2/25/81 9,250' 9,252' 2' 2' Sqz Perfs f/Bond 3/2/81 . C2 ~ 10.000'. 1.0,04~i44' _ 4' .Open f/Injection 2/24/81 10,042'. 10,044'.2' . 4' Sqz Peals f/Boo~ 3/1/81 C5 10 390' 10 455' 65' 4' Open f/Injection 3/1/81 C5 10,490' 10,585'__ 95' . 4' QRen f/Injection 3/1/81, C5 . 10,716'. 10.756'.40' . 4' Open f/Injection 3/1/81 C6 11,044' 11,074' 30' 4' Open f/Injection 3/1/81, C7 11,104' 11,194' 90' . 4' ,Open f/Injectior~ 3/1/81 C7 11,230' 11,246' 16' 4' Open f/Injection GP 3%14RD 19990505.doc DRAWN BY: SLT 5/5/1999 GRANITE POINT PLATFORM APl # 50-733-20079-01 GRANITE PT. ST. GP # 33-14RD WELL HISTORY LAST WORK: 5/5/99 Date Finaled Work Performed 1981 3/6 Completed as a Water Injector. 1998 6/15 GR - RIH w/2.75" Gauge Ring to 500', pulled up to 300', worked area for 30 min., did not see wire, POOH. 6/17 10/2-5 FISH - (Pulled 1,167' of wire out of hole, black asphultine substance on tools.) RIH w/3" side wall cutter, ran in slow to avoid setting down, set down @ 1,517', sheared off cutter, POOH. (Asphultine type substance on tools). RIH w/3" Bowen wire retriever, found wire @ 350', latched wire, POOH w/wire, striped 1,167' wire out of hole. RIH w/3" Bowen wire retriever to 1,500' to make sure all wire was gone to side wall cutter. RIH w/3" JDC to 1,517', beat down, would not latch cutter, POOH. WL - Tried to fish wire. RIH w/ 2.5" lead impression block to 1,530', POOH. Showed impression of wire. (Pulled 2,600' wire out of hole.) RIH w/2 Y2" RS & 1 3,4" RS & 3 prong wire grab to 4,153', latched wire, POOH w/160' of wire. (Pulled 1,609' of old wire out of hole .) 10/6-13 TAG - WL - (Fished 367' of wire out of hole w/3 prong wire grab to 6,222'). Fished 367' of wire out of hole w/2 prong wire grab to 7,262'. RUH w/2 prong wire grab to 6,500' to make sure tubing is clear of wire. RIH w/2.23" blind box to 9,835' (tools are @ 10,386') beat down (solid), POOH. RIH w/ 2 prong wire grab to fished 395' wire out of the hole. Fished wire from 8,085' to 8,700'. Fish wire 8,892' to 9,104'. Fish 200' of wire from 9,198' to 9,520'. Fished wire, couldn't make hole, ran sample bailer, tagged fill & got sample @ 9,612'. 10/20-22 TAG - WL - Bailed injection muck on every run, spang jars would get fouled in muck & wouldn't function After 2 or 3 downward hits, no problem filling bailer. RIH w/ 2.24" gauge ring & tagged fill @ 9,584' KB, Continued bailing fill, 3' away from wire to be fished. Finished bailing solids, only getting sloppy mush in bailer, started fishing wire. RIH w/2.7" wire grab to 9,639', POOH w/3' of wire. 10/29-31 WL - Continued bailing iron sulfide sludge from 9,590' - 9,629'. Bail & fish wire to 9,634'. Continued bailing & fishing wire to 9,676', on last two runs tools got stuck w/no jar action, had to oil jar tools free. Unocal Corporation 909 West 9* Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 UNOCAL ) December 10, 2001 Tom Maunder State of Alaska Alaska Oil and Gas Conservation Commission 333 W 7th Ave # 100 Anchorage, Alaska 99501-3539 Re: Request for Time Extension GP33-14RD MIT Dear Tom; This letter is to request an extension for the shut in MIT on Granite Point 33-14RD. This well has been shut in since November 1999. We currently have a approved project to do the diagnostics required to plan a course of action regarding this well. The proposed diagnostic work includes caliper, spinner and temperature surveys. These will be used to design a repair program for the well. Unocal respectfully requests an time-extension to complete the diagnostic and follow up repair work on the Granite Point 33-14RD well. It is difficult to determine the ti~6 frame to do the repairs prior to the diagnostic work, but we request an extension unti_l Dec 31~, 2002 and plan to leave the well shut in except as needed to complete the diagnostic work. We will keep you updated as the work progresses and submit a form 10-403 with a repair plan as it develops. Please call me if you have any questions or clarification on these issues. Attached is an 10-403 for your approval, please call me at 263-7830, if you have any questions. ~hfi'Stol~h~lfA. Ruff Senior Reservoir Engineer Cook Inlet Waterflood Management RECEIVED DEC 2 1 200! Alaska Oil & Ge, s Cons. Commi,~ Anchorage .Type of Request: ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casing: Change approved prograrr 2. Name of Operate Unocal Alaska Resource., Repair well Pull tubing: 5. Type of well Development Exploratory Stratigraphic: Service: 3. Address Box 19624? Anchorage, Alaska 9951.( 4. Location of well at surfac( 2371'S & 1258'E of the NW comer, Sec. 13, T10N, R112W, SM At top of productive interva 1604'N & 1728'W of the SE comer, Sec. 14 T10N, R112W, SM At effective deptl' 1500'N & 1507'W of the SE comer, Sec. 14 T10N, R112W, SM At total deptl' 1500'N & 1507'W of the SE comer, Sec. 14 T10N, R112W, SM Plugging: Time extension X Variance: Perforate: Stimulate: Other: 6. Datum elevation (DF or KB 7. Unit or Property name UNION-MOBIL STATE #1 8. Well number GP 33-14RD 9. Permit numbel 80-149 10. APl number 50- 733-20079-01 11. Field/Poe Granite Point / Middle Kena KB 95' MSL feel 12. Present well condition summar Total depth: measu red true vertical Effective depth: measured true vertical Casing Surface Intermediate Production Liner Perforation depth Length 561' 4,012' 9,164' 1593' 942' measured 11246-11230 true vertica 10503-10488 Tubing (size, grade, and measured depth) 3.5" 2.375" Packers and SSSV (type and measured deptl' 11420 feet Plugs (measured) 10666 feet 11410 feet Junk (measured) 10657 feet Size Cementec 18" 736sx 13.375" 2250sx 9.625" --- 7" 400sx 5" 200sx 11194-11104 11074-11044 10453-10368 10339-10311 N-80 N-80 Measured deptl' 0'-561' 0'-4012' 0'-9164' 8912'- 10505' 10,468'-11410' 10756-10716 10033-9994 10,387' 10,842' True vertical deptl- 0'-560' 0'-3780' 0'-8457' 8217'-9785' 9748'- 10657' Baker "FB-I" @9898 10585-10490 10455-10390 10044-10000 9864-9771 9735-9670 9325-9281 Baker "FB-I" @10,201 Baker "FA-I" @10,832 13. Attachement~ Description summary of proposal X Detailed operations prograrr BOP sketch: 14. Estimated date for commencing operatic 16. If proposal well verbally approve( Name of approver Date approved 15. Status of well classification as Oil: Gas: Service X Suspended: 17. I hereby certify_thatJhe fo_reg~p~s true and correct to the best of my knowled.( Signed: / ~ ,/F~J//.,,d¢ -' Title: Senior Reservoir En~inee ~' · ~ ' FOR COMMISSION USE ONLY Date: 12/20/01 Conditions of approval: Notify Commission so representative may witness IIAppr°va' No. 301 Plug integ rity.~ BOP Test Location clearance~ ~ * _ Mechanical Integrity Test Subsequent form required 10-~~ ~1~3~% Approved by order of the Commissioner 0riginal,, ..... Commissioner Date "'"'"' RECEIVED DEC 3 1 Z001 Alaska Oil & G~.s Cons. Commission Ancifot'a§e Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE Reason For Time Extension: G P33-14Rd is currently shut-in due to tbg/casing communication. The variance granted on 2/18/99 was granted for 2 years. We are requesting a time extension till 12/31/02 to diagnose this well, repair the well, prove tbg/packer integrity and renew the variance. An AFE has been submitted for partner approval and the diagnostic work will begin early in 2002, as scheduling permits. Run Slickline Tbg Integrity Survey Granite Point Platform Well #GPP 33-14RD Granite Point Field The GP 33-14RD well is completed in the Tyonek C-2, C-5, C-6, and C-7 intervals. This well appears to have communication between its 9-5/8" and 13-3/8" casing strings. The well had been shut-in in 1990 due to slickline tools and 10,400' of wire being left in the hole. The AOGCC had granted a variance to allow injection into this well as long as pressure integrity is maintained in the 3-1/2" tubing above the packer at 9,899'. Removal of the wire down to 10,201' with slickline, and the subsequent tbg punches, allow injection to be restored at about 774 bwpd @ 3600 psi. GPP.33-14RD is currently shut-in with the discovery of a breach in the tubing's integrity resulting in tbg/csg communication on 10/31/99. It is proposed to run a slickline conveyed caliper, spinner & temperature survey on GPP 33-14RD to determine the tubing condition and location of tubing holes for isolation with either coil tubing or tbg patch(es). RECEIVED I EC 3 200 12/20/01 \g~,k-Anchorage\Groups\OOE~OOEFields\GP~Granite Point~Wells\Gp 33-14\Gp 33-14RDInjAState_Forms\403\Time Extension 12-20-01 .xls 5:06 PM RF~,: FW: GPP 33-14RD Subject: RE: FW: GPP 33-14RD Date: Mon, 1 Nov 1999 18:35:57 -0800 From: "Ruff, Christopher A" <ruffc~unocal.com> To: "Wondzell, Blair E" <Blair_Wondzell~admin.state.ak.us> Thanks for the response. We will contact you when we have more information. Chris Ruff Reservoir Engineer Waterflood and Reservoir Mg~nt Unocal Alaska 907-263-7830 Check out : http://kodiak.anchortown.unocal.com/Surveillance/Goal.htm From: Wondzell, Blair E Sent: Monday, November 01, 1999 4:39 PM To: Ruff, Christopher A Subject: Re: FW: GPP 33-14RD Chris, Got your note for Blair. Please keep us informed of the work. Chris Meyers called earlier today regarding the well, however we were not able to talk. I have called him back and left my home number. I will probably try to call you' as well. Home phone if you need it is 345-0850. Thanks. Tom Maunder "Ruff, Christopher A" wrote: > Blair, > Granite Point Well 33-14RD, which currently has a variance to inject, > experienced communication between the tubing and casing this weekend. We > have shut in the well and are scheduling some diagnostic work. I will keep > you informed of our progress. > The well will remain shut-in, except for minor injecting to allow testing of > the well, until we have figured out the problem. > Thanks > Chris Ruff > Reservoir Engineer > Waterflood and Reservoir Mgmt > Unocal Alaska > 907-263-7830 > Check out : http://kodiak.anchortown.unocal.com/Surveillance/Goal.htm > > From: Tyler, Steve L. -Contract > > Sent: Monday, November 01, 1999 8:08 AM > > To: Lawrence, Steve C > > Cc: Ruff, Christopher A; Rhodes, Dustin J; Collins, Jerry D; Cowan, 1 of 2 11/17/99 2:59 PM RE; FW: GPP 33-14RD ! Tim > > S; Medley, Ted J > > Subject: GPP 33-14RD > > Steve > > 33-14 lost it's tbg integrity and started communicating with the tbg x > > 9-5/8" and 9-5/8" x 13-3/8" annuli's this weekend. > > Could you make arrangements, with the platform, to perform a wellhead > > integrity test when your schedule permits? > > Thanks >>> > > Steve Tyler > > Unocal Alaska > > Contract > > (907) 263-7649 Office > > (907) 263-7884 Fax > > tylerslSorion, unocal, com 2 of 2 11/17/99 2:59 PM FEB-11-99 THU 18:59 UNQORL ~SSET GRS GRP FRX NO, 9072~7874 i~) STATE OF ALASKA)'' ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS P. 03/06 I I. Type of Request: ~.... 2. N~rne 'of Operator Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casing: Repair weJl: Plugging: Time extension: Stimulate: ,, Chan, g.e approved program: Puli tubing: Variance: X Perforate"-;- Other: ...... 5. Type of well: 6. Datum elevation (DF or KB) Unocal Alast(a Resources 3. Address Box 196247 Anchorage, Alaska 99S19 4. Location of well at surface 2371'S & 1~.58'E of the NW corner, Sec. 13, T10N, R112W, SM. At top of productive interval 1604'N & 1728'W of the SE corner, Sec. 14 T10N, R112W, SM. At effective depth 1500'N & 1507'W of the S E corner, Sec. 14 T 10 N, RI 12W, S M. At total depth 1500'N & 1507'W of the SE corner, Sec. 14 Tt0N, R112W, SM. Development: Exploratory' Stratigraphic: Service: 7. Unit or Property name UNION-MOBIL STATE #1 8. Well number GP 33-14RD 9. Permit number 80-149 "i0. APl number 50- 733-20079-01 11, Field/Pool Granite Point t Middle Kenal KB 95' MSL feet 12. Present well condition summary Total depth: measured 11420 feet true vertical 10666 feet Plugs (measured) Effective depth: measured 11410 feet Junk (measured) true vertical 10657 feet Casing Length Size Cemented Measured depth True vertical depth Surface 561' 18" 736sx 0'-561' 0'-560' Intermediate 4,012' 13,375" 2250sx 0'-4012' 0'-3780' Production 9,164' 9.625" --- 0'-9164' 0'-$457' Uner 1593' 7" 400sx 891 Z- 10505' 8217'.9785' 942' 5" 200sx 10,468'- 11410' 9748'- 10657' Perforation depth: measured 11246-11230 11194-11104 11074-11044 10756-10716 10585-10490 10456-10390 10044-10000 true vertical 10503-10488 10453-10368 10339-10311 10033-9994 9864-9771 9735-9670 9325-9281 Tubing (size, grade, anti measured depth) Packers and SSSV (type and measured depth) 13. A'~tacnements Descrlptfon summary of proposal: .~ _ 14. Estimated date for commencing operation 16. If proposal well verbally approved: Oil: .......,, Name of appro,ver Date a~pproved Service: 17. I hereby certify that the i~l'egoir]g is' ~t;~;at'l~correct to the best of my knowledge. Christo~u~~/// _ .Signed: / . ~//,~'/,,,'""~'-~'~' Title: Senior Reservoir Engineer v · u' - ~ FOR COMMISSION USE ONLY 3, 5" N-80 10,387' 2.375" N-80 10,842' Baker "FB-I" ~9898' Baker 'FB-I" ~10,201' Baker 'FA-I' ~ I0,832' BOP sketch: ........... Detailed operations program: .. 15. Status of well classification as: Gas: Suspended: = ,. Conditions of approval: Notify Commission so representative may witness IApp, ov, No. Plug integrity .... BOP Test Location clearance. . :.~ Mechanical.l.nt .egrity Test.. Subsequent. form required 1 O- . J ~t~.~ .. IGNED BY commissioner o.... I Fo, m 10-403 Rev 0~/1 ,~88 . ,~,~.~ t i~. ~Rrlster}$0n SUBMIT IN TRIPUCATE Approved Copy FEB- 11-99 THU 19:O0 UNOCAL Illl II Illl RKB to TBG Head = 38.Z0' Tree connection: C-2 C-$ C-5 ~- C-6 ~ c-? C-7 _ KB ELEV: = 106' PBTD = 11,410'TD = 11,42;)' MAX HOLE ANGLE = 32° _33-14rdHist 12-10-98.doc UNOORL RSSET GRS GRP FhX NO, 9077~)7874 P, 04/06 Granite Point Well # 33-14RD Completed 3/6/81 SIZE CASING AND TUBING DETAIL GRADE CONN ID TOP BTM. 13-3/8" 61.0 9-5/8" 40 & 43.5 7" 29 5" 18 Tubing: 3-1/2" 9.2 9.'~IR" 4. 7 K-55 Butt. LT&C N-80 & S-95 Butt. LT&C P-I l0 Btm LT&C N~80 Butt. LT&C N-80 Butt 12.5t5 Surf 4012' 8.755 Surf 9164' 6.184 8912' 10,505' 4.276 10,468' 11,410' 2.992 0' 10,387' NO. Deoth 38 I 9859' 2 9898' 3 9899' 4 9902' 5 10,015' 6 I 0,085' 7 10.200' 8 I0,201' 9 10.204' 10 10,309' I 1 10.347' 12 10.386' 13 10,797' 14 i0,829' 15 10,832' 16 lO. 8Z, l' btm JEWELRY DETAIL ID Item OCT 2 Stage Unihead Tbg Hanger Otis "XA" Sliding Sleeve Baker Model "0-22" Locator w/80-40 Seal A.ssy, 17.45 lng Baker Model "lB-l" Ret. Prod. Pkr. size 85-40 Millout Ext. w/5" 8rd X 3-I/2" Butt. XO 3-I/2" Camco MMO'W Mandrel w/"RW" Regulator. 3-1/2" Camco MMGW Mandrel w/"Riked' Dummy, Baker Model "G-22" Locator w/80-40 Seal Assy, 10.45 lng Baker Model "FB-I" Ret. Prod. Pkr. size 85-40 Millout Ext. w/5" 8rd X 3-1/2" Butt. XO 3-1/2" Camco MMOW Mandrel w/"RW" Regulator. 3-1/2" Camco MMOW Mandrel w/"Riked" Dummy. Crossover, 3.112" Butt Box X 2-3/8" Butt Pin Otis "X" Nipple Baker Model "G" Locator w/20-25 Seal Assy, 10.45 lng Baker Model "FA-I" Ret. Pwd. Pkr. Mule Shoe Fill Tagged on FISH: 10/10188 2-II/! 6" Swedge, Spang jars, hyd. jars, !9,~' ef-::ire 12/I 0/98 Finished retrieving approximately 10,200' of wire and scale, Taooed lfl ')'Icl' wl~ PERFORATION HISTORY f/XO @ 10.387' to 350' ' ", ]i Interval .................. A¢cum. · Date; Zonal Top , Btm Amti spf ~Present Conditi0n 2/25/8;I" 9,250' 9,252' 2' 2' Sqz Pads fl Bond 3/2/81 C2' '10,000' 10,044' 44' 4' Open f/Iniection I" 2/24/81 10.042' 10,044' 2' 4' Sqz Perfs f/Bond 3/1/81 .C2 .... 1~,390' 10,455' 65' _ .4' _., Open f/Injection ~_ 3/1/81 CS 10,4,90' 10,585' 95' 4' Opm 1/;njection __ ~U~'l cs j ~o.?~' ~o:~' 40' 3/1/81 C6 11,0~4; ' '1i,074; 30' 4' Ope_n__f/_!_nj_~.a!_' .......... 311181 "C7'"' ' 11,104' 11,194' 90' 4' open f/Injection -- , ....... 3/1/81 C7 11,230' ~ 1.246' 16' 4' Open f/Injection "Hill I I ! I I I I I I I II II ! I REVISED: 12/10/98 DRAWN BY: SLT FEtg-11-99 THU 19:O0 UNOORL R$$ET GRS GRP FRX NO, 90726,¢7874 P, 05/06 [ TIME "[T~__B)'NG P'RESSURi~' 9~1~" CASING I 13 318'' CAS'iNG ) iNJr=cTioN 7:00P. M. 0 248 258 [ 1130 7:30 P.M. 2900 ' 268 262 ......... 1'~ ........... 8:00 P.M. 3000 252 270 103 ' '9:Od P.M' 3O5O ..... 248 ............ 283 ~01 . 10:00 P.M. 2700 239 283 85 ~ 1:0~ p.M. 2940 239 277 -'-~- ........................ 12:00 A.M. 2880 232 275 97 i:00 A;~' 2900 230 272 94 2:00 ............... A.M. 2900 229 .... 272 ' 94 3:00 A.M. 2890 '" 226 ...... 272 ...... ~' 4:00 A.M. 2890 226 272 92 5:00 A.M. z~ '¢"z6 z~z 6:00A. M. ' ........8B~© ................5-~-~' .......... ~7~ ....... 78 8:00 A.M. ~ , ,¢3~ ........... 269 10:00 A.M. 12:00 P.M. 2:00 P.M. . , ,, ~:00 P.M. ............... -6:00 PM., ................ 8:00 ~O:O0~.M. . ........... ~'1ZOo A.M.' ................................... { ..... ", .... · ....... , .......... , ......................................... ......... --~ ....................... .......... .., ........... .......................... ........... ....... TEST3314 FEI3-11-99 THU 19: 01 UNOCAL RSSET G~q$ GRP "7 ,P'a-q ~-~_r- r,', )'- K ~-$~ u F $ FAX NO. 9072637874 P. 06/06 .P.rocedure for MIT on.Shut-in Granite Point Injector 33,14 1. Record daily tubing, casing, and outer casing pressures for a consecutive three (3) day period. 2, Bleed 200 psi off current 9-5/8" casing pressure. Bleed 100 psi off current 13-3/8" casing pressure. Record this pressure along with the date and time. Please note how long it took to bleed the pressure off each casing and indicate fluid type or gas. 3. Continue recording daily tubing, casing, and outer casing pressures for a consecutive seven (7) day period. 4. Fax completed form to Steve Tyler @ 263-7874. Bled press to- Date Time Tubing Pressure 9-518" C...sg Press. .1.3.-.318:'.. Csg Press e/29i~;' oaoo " 0 ' 235 220 8~30~97 ....... 0800 (~ .............. 238 " 220 8131/97 "'080~) ......... 0 .......... 235 " i88- I' o,oo I' 0 I ............ I I iiiiiii iiiii i i i i I II I I II _ 9/1"~'7 ' 0900 ......... 0 ........... ~60 ....... ' ......... '21~" - '" ' ~i2i970900 0 ' 35' 25 "'{~/3i9'7" 0900 .... 0 ........... 100 " 100 9/4/9'~ ' 0900' (~ ........... 140 "' 140 915/97 " 0900 0 ...... 160 ............ 160 9/6/97 0900 0 175 i"75 9/7/97 ...... 0900 0' 18~' ..... 185 9/8197 0gO0 0 197 197 .... , , , 9/2/?7 2" Plug was leaking on 13-3/8" csg. Fixed same. 8/31/97 Bleed offin£o 9-$/8" csg took 2 min to bl~d off. Fluid typo: water. ] 3-3/8" csg bled gas. it took a little more than one min to bleed. DEC-10-98 THU 18:50 UNOOfiL fiSSET GhS GRP F,'qX NO, 9072637874 Unocal Corporation Agricultural Products 909 West ¢ Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 Telephone (907) 263-7830 UNOCAL ) P, 01/04 December 1.2, 1998 Blair Wondzell State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: Granite Point 33.14RD Request for variance Dear Blair: A injection test was run on 33-14RD on February 11, 1998. D£C 1998 1" chicksan pipe, 1" turbine flow meter and 1" choke was hooked-up to the tubing, water was injected down the tubing at a pressure not to exceed 3000 psi, Pressure readings were taken on the tbg, 9-5/8" csg and 13-3/8" csg every two hours, The results from this test prove there is tubing/packer integrity and there is no communication to the 9-5/8" casing string. We have spent around $75K cleaning out around 10,000' of wire from the well and now have access to the interval we were previously injecting into. We would like to begin injection as soon as we can complete the installation of the surface piping. We are requesting a variance on this well since a conventional MIT can not be run due to the possible 9 5/8" casing leak near 4003'MD. We believe the cement squeeze which was tested to 1300 psi on 2/28/81 failed during a MIT in 1992. Senior Reservoir Engineer Cook Inlet Waterflood Management Please return a signed and dated copy of this letter to document a passing~ MIT for our records. Blair Wondzell ~/ Petroleum Engin~r AOCK2C Attachments: 7 day Shut-in MIT 2 hour Injection Test Wellbore drawing Date DEO-lO-98 THU 18:51 UNOCAL RKB to TBG Head = 38.20' C-2 C-5 '.= c-~ :.-= C-? ::_~ C-7 ...... ~r'' · ~ ~ ' KB ELEV: = 105' PBTD = 11,410'TD = 11,420' MAX HOLE ANGLE = 32° C-$ _33-14rdHist 12-10-98.doc UNOOflL flSSET GhS GRP F~× NO. 9072637874 P. 02/04 ) Granite Point Well # 33-14RD Completed 3/6/81 SIZE WT CASING AND TUBING DETAIL GRADE CONN ID TOP BTM. 13-3/8" 61.0 9-5/8" 40 & 43.5 7" 29 5" 18 Tubing: 3-1/2" 9.2 K-55 Butt. LT&C IZ515 Surf 4012' N-80 & S-95 Butt. LT&C 8.755 Surf 9164' P- 110 Butt. LT&C 6. ! 84 8912' 10,505' N-80 Butt. LT&C 4.276 10,468' I 1,410' N-80 Butt 2.992 0' 10,387' N~.R(I IRn~ ............. I ~Q~ I(I 'IR"/ 'If} Rd'/' ....... ~ Depth.., 38 I 9859' 2 9898' 3 9899' 4 9902' 5 10,015' 6 10,085' 7 10,7-o0' 8 10,201' 9 I0,204' 10 10,309' l I 10,347' 12 10,386' 13 10,797' 14 10,829' 15 10.832' 16 10,841' btm .IEWELRY DETAIL ID Item OCT 2 Stage Unihead Tbg Hanger Otis "XA" Sliding Sleeve 3.00 Baker Model "G-22' Locator w/80-40 Seal Assy, 17,45 lng Baker Model "FB-I" Ret. Prod. Pla-, siz~e 85-40 Millout Ext. w/5" 8rd X 3-1/2" Butt, XO 3-I/2" Camco MMGW Mandrel w/"RW" Regulator. 3-1/2" Camco MMGW Mandrel w/"Riked" Dummy. Baker Model "0-22" Locator wt 80-40 Seal Assy, 10.45 lng Baker Model "I~-1'' Ret. Prod. Pla'. size 85-40 Millout Ext. w/5" 8rd X 3-I/2" Butt, XO 3-1/2" Camco MMGW Mandrel w/"RW" Regulator. 3-1/2" Camco MMOW Mandrel w/"Rik'ed" Dummy. Crossover, 3-1/2" Butt Box X 2-3/8" Butt Pin Otis "X" Nipple Baker Model "G" Locator w/20-25 Seal Assy, 10.45 lng Baker Model "FA-I" Ret. Prod. Pkr. Mule Shoe Fill Tagged on FISH: 10/10/88 2-11/16" Swedge, Spang jars, hyd. jars, 10,400' cf 12/10/98 Finished retrieving approximately 10,200' of wire and scale, Tnao~,d II'} ?'i~' wire f/XO @ 10,387' to 350' PERFORATION HISTORY Interval Aooum. Date .... Zone ,Top B{m Amt ....... spf' Present Condition 2/25/81 9,250' "" 9,252' 2' 2' Sqz Perfs f/Bond 3/2/81 C2 10,000' 10,044' 44' 4' Open f/In)eclion ......... 2/24/81 10,042' 10,044' 2' 4' Sqz Perfs f/Bond 3/1/81 C2 ........... '~),390' 10,4,55' 65'" " 4' Open fl Injection $/1/8i C5 ' 10,490' 10,585' 'SE,, '"' 4, ...0...p..e~l. f/Irlle~tlOrl 3/1/81 05 10,716; ...... 10,756; 40' 4' , .Open fl Injection ... 3/1/81 c6 ........ 11 ,o44' 11,074' 30"' 4' Open f/Injection 3/1/81 C7 11,104' 11,194' 90' ~ 4' Op~ f/IOjeC,On . , 3/1/81 i C7 11,230' 11.246' 16' 4' REVISED: 12/10/98 Alas~aO~ &C,~sCo~s.~ DR~WN B DEO-lO-98 THU 18:51 UNOOhL hSSET G~%S GRP FhX NO, 9072637874 P, 03/04 T~'--J~E'== I TUBING PRESSURE]"9 ~/I8~' CA S~ ~N ~~3 3--!8''CASI~--G' j iNJECTION RAT__E_._ ..................... ..,..,,,,,.,,., ........................................ -.,. ..................... .,~.~..._.,~.,,. ............. ,.,,~ ~;~,'.:..'~'$! ~:;~;:~...:::::,:::-;i;:.::,~::¢¥:::.~~~ 7:00P.M. 0 248 258 1130 7:30 P.M. 2900 268 202 108 8:00 P.M. 3000 252 270 103 9:00 P.M 3050 .... 248 283 '" 101 10:00 P.M. ' 2700 ...... 239 - 283 ' 85 -;i-;I ~00 P,M.~ ......... -~'210 ..... 2~9--' 277 ......... 92 12:00 A,M. 2880 232 275 97 2-12298 .`~.`.?~;~.?~?:.~9:~:::~`~¢....~::`:`~:~.~:.?.:q`:i~:::.;:``.~,``..;...~('::,`~:.~.`.:!~`i.::~;;:::~:i:i~:~..``i~`(.%~:~:~:~`~.¥~.~::~;~.~.;~.~`~.~:.~i~b::'~:~!~:.~:i~~ .'~i~.~(~/~...~....~.::~'`~.:~;.::~;:`:```:`:~:~:':....:~.~.~.:~`;.~:.~;:~.`~:`:`~`.`..':`:~``.~ : 1:00 A.M 2900 230 272 94 ................... 2:00 A.M. " 2900 ' 229 272 94 -- ~ ..... 3:00 A.M. 2890 226 272 92 4:00 A.M. 2890 226 272 92 , . 5:00 A,M. z~ -~.zc z?z '~ 'z., 8:00 ^._M. a~?_5 ,,e8~/ ......... ~_6q' e2 ..................... 10:00 A.M. .... 12:00 P.M. l:O0 P.M. r6:oo .. M_.__']'_'"'-.- ................................ i ..... ................. ' .................... '-_-_ ! 8:00 P,M. 10:00 P.M. 12:00 ..................... . ........ -- _ ..................... TEST3314 ' DE0-10-98 THU 18:52 UNOCAL ~$$ET G~S GRP FRX NO, 9072637874 P, 04/04 Procedure for MIT ,,on Shut-in G,ranite Point Injector 33:14 1. Record daily tubing, casing, and outer casing pressures for a consecutive three (3) day period. 2. Bleed 200 psi off current 9-5/8" casing pressure. Bleed 100 psi off current 13-3/8" casing pressure. Record this pressure along with the date and time. Please note how long it took to bleed the pressure off each casing and indicate fluid type or gas. 3. Continue recording daily tubing, casing, and outer casing pressures for a consecutive seven (7) day period. 4. Fax completed form to Steve Tyler @ 263-7874, Bled press to- IWell #: 133-14 Date .. Time Tubing Pressure 9.$18"..Csg Press. 13,3/8" Ceg Press 8/2g/g7 0800 0 235 220 . .... 8/30/97 ....... 0800 ........... 0 ...... 238 220 8/31"/97 0800 0 ........... 23,~ ............. i'88 .... ..11111 iiii ii . iii IIII]1 i III iiiiiiii IIIIIII ~ - iiiiii . _ -- i 8131/97 0900 ! iii ii iiiiii1[ iii ii i~ llllll iiiI i iiiii i - i ii iii ii i'1 i i i iiiii iii ii ii i i - - 9/119~;"" 0900 0 160 20 - 912/97 0900 ........ 0 3-5 ........ 25- ::' ....... " 9/3197 0900 0 100 ....... 100 9/4/97 0900 0 140 140 9/5/97 0900 o 16o 160 ........ g~6~/97 0900' 0 175 175 9/7/97 .... 090'o .... ~ ...... 0 .... 185 '- 185 9/8/97 0900' o 197 197 9/2/97 2" Plug was leaking on 13-3/8" csg. Fixed same. 8/31/97 Bleed off info 9-5/8" cs8 took 2 rain to bleed off. Fluid type: water. 13-3/8" csg bled gas. It took a littlo more than one min to ble~d. FEB-11-99 THU 18:59 UNOO/~L aSSET GaS GRP FaX N0 9072637~4 Unocal Corpol'atio~ Agficultutal Products 909 West 94 Avenue, P,O. Box 196247 Anchorage, Alaska 99519-6247 Telephone (907) 263-7830 UNOCAL P, 02/06 January I9, 1999 Blair Wondzell State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: Granite Point 33-14RD Request for variance Dear Blair: An injection test was run on 33-14RD on February 11, 1998. 1" chicksan pipe, 1" turbine flow meter and 1" choke was hooked-up to the tubing, water was injected down the tubing at a pressure not to exceed 3000 psi. Pressure readings were taken on the tbg, 9-5/8" csg and 13-3/8" csg every two hours. The results from this test prove there is tubing/packer integrity and there is no communication to the 9-518" casing string. We have spent around $75K cleaning out around 10,000' of wire from the well and now have access to the interval we were previously injecting into. We would like to begin injection as soon as we can complete the installation of the surface piping. We are requesting a variance on this well since a conventional MIT can not be run duc to thc possible 9 5/8" casing leak near 4003'MD, We believe the cement squeeze which was tested to 1300 psi on 2/28/81 failed during a MIT in 1992. Attaehn~nts: Form 10-403 7 day Shut-in MIT 2 hour Injection Test Wellbore drawing Senior Reservoir Engineer Cook Inlet Waterflood Management FEB-1 1-99 THU ') STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS ~and;n: Suspend: operation shadow: Re-enter suspended well; Alter casing: Repai~well: Plugging: -- Time extension: Chang.e approved program: Pull tubing: Varian-ce: X Pertorate---~': 2. Name of Operator Unocal Alaska Resources P, 03/06 3. Address Box 196247 Anehom_ge, Alaska 9,9519 ,. 4. Location of well at surface 2371'S & 1258'E o1' the NW corner, $e0.13, T10N, R1 t2W, SM. At top of productive interval 1604'N & 1728'W of the SE corner, Sec. 14 T10N, R112W, SM. At effective depth 1500'N & 1507'W of the SE corner, Sec. 14 T10N, R112W, SM. At total depth lS00'N & 1507'W of the SE corner, Sec. 14 T10N, R112W, SM. Stimulatei Other: 5. Type of well: Development: Exploratory: Stratigraphic: Service: X 6. Datum elevation (DF or KB) KB 95' MSL feet 7. Unit or Property name UNION-MOBIL STATE #1 8. Well number GP 33-14RD 9. Permit number 80-149 10. APl number 50- 733-20079-01 11, Field/Pool Granite Point / Middle Kenal 12. Present well condition summary Total depth: measured 11420 feet true vertical 10666 feet Plugs (measured) Effective depth: measu red t 14 t0 feet dunk (measu red) . ~ ~:~..~, !,~..~ ~., ;~ true vertical 10657 feet .~:, .... , Casing Length Size Oamen~d Measured depth True vertical depth Sur~ 561' 18" 736sx ~-561' 0'-56W I n~rmediate 4,012' 13,375" 2250sx 054012' 0'-378W Production 9,16W 9.625" --- 0'-9 t ~' 0'-84$7' Lin~ 1593' 7" ~sx 8912'- 10505' 8217'.9785' 942' 6" 200sx 10,468'-11410' 9748'- 10657' Perforation depth: measured 11246-11230 11194-11104 11074-11044 10756-10716 10585-10490 1045,6-10390 10044-10000. true vertical 10503-10488 10453-10368 10339-10311 10033-9994 9864-9771 9735-9670 9325-9281 Tubing (size, grade, and measured depth) 3.5" N-80 10,387' 2.375" N-80 10,842' Packers and SSSV (type and measured depth) Baker "FB-I" @9898' Baker "FB-I" {t 10,201' 13. Attachements Descrlpllon summary of proposal: L Detailed operations program: ,, Baker "FA-1" ~ 10,832' BOP ,ketch: 14, Estimated date for commencing operation ~'~. If prOposai Well verbally ap'provec~: .................. Oil: Name of ,approver .... .,Date approved Service: 17. I hereby certify that the f~regoir]g Is ~ugjal~correct to the best of my knowledge. · Christo,~~u~t~/~/// ..... S, gn~: (.~ ~'~//_~ Title: Senior Reservoir Engineer FOR COMMISSION USE ONLY 15. Status of well classification as: Gas: Suspended: ] ,,'~1 K I A I I L IBI/RL Date: Conditions of approval: Notify Commission so representative may witness Approval No. Plug integrity BOP Test~ Location clearance : : Mechanical Integrity Test.· Subsequent form required I O- ....... .,. · TApproved by o, ,r~r of the Commissioner Fo~m 10-40~ Rev 00/18/88 ORIGINAL SIGNED BY Robert N. Chdste~son Commissioner Approved COpY Re. turned SUBMIT IN TRIPUCATE FEB-11-99 THU 19:O0 , UNOCAL RKB to TBG Head = 38.20' Tree connection: C-5 15 [ c-s [ c-? '-- c-? KB ELEV: = 10S' PBTD = 11,410'TD = 11,420' MAX HOLE ANGLE = 32° _3 3 - 14rdHi st 12-10~9 $.doc C-5 UNO0~I. ~SSET G~S GRP FP, X NO, 90726378~4 ,} P, 04/O6 Granite Point Well # 33-14RD Completed 3/6/81 llllll II Imll II I I II I I I I CASING AND TUBING DETAIL SIZE WT GRADE CONN ID TOP B*I~I. 13-3/8" 61.0 K-55 Butt. LT&C 12.515 Surf 4012' 9-5/8" 40 & 43.5 N-80 & S-95 Butt. LT&C 8.755 Surf 9164' 7" 29 P-110 Butt. LT&C 6.184 8912' 10,505' 5" 18 N~80 Butt. LT&C 4.276 10,468' I 1,410' Tubing: 3-1/2" 9.2 N-80 Butt 2.992 0' 10,387' 9.~I/R" d. 7 NJ_Rtl l~.tt ! OQ~ l~1 :IR7 t(~ R/lO' 38 1 9859' 2 9898' 3 9899' 4 9902' 5 10,015' 6 10,085' 7 10,200' 8 10,201' 9 10,204' 10 10,309' 11 10,347' 12 10,386' 13 10,797' 14 10,829' 15 10,832' 16 10,gal' btm JEWELRY DETAIL Item OCT 2 Stage Unihead Tbg Hanger Otis "XA" Sliding Sleeve Baker Model "G-22" Locater w/80-40 Seal Assy, 17.45 lng Baker Model "FB-I" Ret. Prod, Pkr. size 85-40 Millout Ext. w/5" 8rd X 3-1/2" Butt. XO 3-1/2" Camco MMGW Mandrel w/"RW" Regulator. 3-1/2" Camco MMGW Mandrel w/"Riked" Dummy, Baker Model "G-22" Locater w/80-40 Seal Assy, 10AS lng Baker Model "FB-I" Ret. Prod, Pla', size 85-40 Miliout Ext. w/5" 8rd X 3-1/2" Butt. XO 3-1/2" Camco MMOW Mandrel w/'°RW" Regulator, 3-1/2" Camco MMGW Mandrel wt "Riked" Dummy. Crossover, 3-1/2" Butt Box X 2-3/8" Butt Pin Otis "X" Nipple Baker Model "G" Locater w/20-25 Seal Assy. 10,45 lng Baker Model "FA-I" Ret, Prod. Pkr. Mule Shoe Fill Tagged on FISH: 10/10/88 2-11/16" Swedge, Spang jars, hyd. jars, !0,400' cf wire 12/I0/98 Finished retrieving approximately I0,200' of wire and scale, Ta~ed I 0 ~'{g' wl~ PERFORATION HISTORY f/XO @ 10,387' to 350' Interval ......................... A{mUm. Dat® zOO1® T°p I Btm Amt spf"' ~Present Condition --2~-5/81-- 9,250, 9,252' 2. [ Z Sqz,,, Perfs f/Bond ...... 3/2/81 C2 '10,000' 10,044' 44' 4, Open f/Injection 2/24/81 10,042' '"1'0,0;~4'' ' 2' 4' ....... 3/1/81 C2 10,390' 1 O, 455' 65' 4' O.Pen !./. Injection 3/1/8'1 C5 ' 10,4,90' 10,585' 95' 4' Open f/Injection 3/1/81 C5 10.716' 10.756' 40' 4' Open f/Injection 3/1/81 C6 11.044' "'~ i.074" 30' 4' Open f/Injection 3/1/81 C7 11,104' 11,194' 90' 4' Open f/InJecllon ._ 3/1/81 C7 11,230' "~ 1,246, ' .... 16' 4' Open f/Injection REVISED: 12210/98 DRAWN BY: SLT FEB-1 1-99 THU 19',00 UN00~L ~IS:3ET G(~:3 GRP FAX NO, 9072637~.'74 P, 05/06 ~"-~1'7~'i~ ........ -~TU__BING PRESSURI~ 9 5/8" CASING 1' 13 3/8" CASING I INJECTION RATE 7:0OP. M. 0 248 258 1130 7:30 15~'M .... 2900 .... 268 262 1°8 ........................................................................ 8:00 P.M. -' 3000 252 270 103 .... ~:00 ~-~M .... 30§0 24~ ............. 2aa ..... lO~ .......... 10:00 P.M. 2700 239 283 85 ~iO0 P.M. 2040 239 ........ 2-~"7 --~- ......................... -i-2'i00 ^iM. - ..... 2880 ......... 2.32, 275 i:00-A-.~' 2900 230 272 94 2:00 A.-M-.~ ..... 2~00 .......... 22-§ 272 ............ 04 .. , 3:00 ^.M. 20~0 22~ 272 92 ............ ..................... 4:00 A.M. 28~0 22~ 272 02 .... 5:00 A.M. z,~ ~"'~c z?z 9?.- :,.8:oo A:~__. ....... ~75 ...... ,a~q ..... ,?_6~ . ?8 ................ 10:00 A.M. ....... '12:00 P.M. 2:00 P.M. , ~1:00 ~.M. '6:00 P.M. .............. '12:00 A.M. .............. ...... ..... .................... ............................... ...... ............................................. ........... , .... ......................................... , ......................... ..................................... . . , ~ ...... . . _ ................ ........... .................... ........... ..... ...... ................ . ........... · ...... , ......... TEST3314 FEB-11-99 THU 19:O1 UNOCAL aSSET GaS GRP NO, 9072637~4 P, 06/06 Procedure for MIT on Shut-in Granite Point Injector 33-14 1. Record daily tubing, casing, and outer casing pressures for a consecutive three (3) day period. 2~ Bleed 200 psi off current 9-5/8" casing pressure. Bleed 100 psi off current 13-3/8" casing pressure. Record this pressure along with the date and time. Please note how long it took to bleed the pressure off each casing and indicate fluid type or gas. 3. Continue recording daily tubing, casing, and outer casing pressures for a consecutive seven (7) day period. 4. Fax completed form to Steve Tyler @ 263-7874. ]we,,.: 133:i4:::! Date Time . Tub!ng Pressure 9-518" csg Press.13-318" csg Press 8/29/~" 0800 0 235 220 8/30/97 0800 0 238 220 '8/31/97 0800 ' 0 ....................... 235 " 188 ........ 8/31/97 ..... , .................. .. . i!1 _ ii ! ~ .... i i I I . iiiiiii iiii iiiii ii i i I i iiiii i IIIIIIII i ii I iiiii 9/ /97 o9o0 0 20 9/'2i97 0900 ................. 0 35 2~' ....... 9/3/97 0900 0 100 100 9/4/97 0900 0 ......... 140................ 140 "' 9/5/97 '" ~3~00 0 160............ 160 9/6/97 0900 0 175 175 9/7/9'~ "'0900 ....... 0" 185 ............... 185 ........ 9/8/97 ....... Ogo0 0 ......... 197 197 ........ Bled press to- 9/2/97 2" Plug was leaking on 13-3/8" csg. Fixed same. 8/31/97 Bleed offin£o 9-5/8" csg took 2 rain to bleed off. Fluid type: water, 13-3/8" csg bled gns. It took a little more than one rain to bleed, JUN-29-98 MON 13:41 UNOOA,L SET GAS GRP FAX NO. 9072637 4, P. O1/O1 Unocal Corporation 909 West "' 9 Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 UNOCAL June 29, 1998 Wendy Mahan Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Wendy, Re: Status of Unocal's Cook Inlet Injector Work This letter is to provide you with an update of the work conducted siucc our March 27, 1998 letter which you signed granting time extensions for various wells. Testing or work was completed on the followin~ wells and the results of this work is listed: ~- o7 :, Anna 4642 : SI MIT approved on 4/17/98. King 4RD King 15RD ~o-Dolly D-16RD Dolly D-22 SI MIT approved on 4/17/98, SI MIT approved on 4/17/98. SI MIT approved on 4/17/98. SI MIT approved on 4/17/98. Grayling 22 : Workover completed on 4/19/98. Grayling 36DPN : Workover completed on 4/28/98. Monopod A-12RD2 : SI MIT approved on 6/03/98. Monopod A-29 : SI MIT approved on 6/03/98. Baker 9 : SI MIT approved on 6/03/98. planning acid treatment to clean tubing for lesting. King 22RD : Variance granted on 6/09/98, Jug test proved casing integrity. Anna 27-42 :Coil Tubing clean out completed on 6/25/98, further testing scheduled to prove casing integrity. Anna 19-42 :Coil Tubing cleanout completed on 6/27/98, further testing scheduled to prove casing integrity. Granite Point 33-14RD: Wireline fishing continuing to remove wire and wireline fish from well. Grayling 5 : Redrill in progress. workover scheduled. Jug test proved communication, workover scheduled. Testing or work was attempted on the following shut-in we. lis and a time extension until September 30, 1998 r_eouested to complete further work and testing, ~, Anna 19-42: Coil Tubing clean out completed on 6/27/98, furtl]er testing scheduled to prove casing integrity. el 1~ Anna 27-42: Coil Tubing clean uut completed on 6/25/98, further testing scheduled to prove casing integrity. ,,-4 Grayling 28: Coil Tubing cleanout planned to follow currently active rig program. 0'5 Grayling 40: Workover schedule in current rig schedule. -.lS-o~,z. King 4RD : SI MIT granted on 4/17/98, workover scheduled. ~)%q-King 15RD: SI MIT granted on 4/17/98. Jug test proved communication, workover scheduled. As you can see we are making excellent progress. Unocal respectfully requests a time-extension until September 30, 1998 to complete the work on the above listed Anna wells. The Grayling and King work will be executed per our current drilling schedule. Please call me if you have any questions or clarification on these issues. Cook Inlet Waterflood Management Please acknowledge the approval of the time extension and your receipt of Iris letter b~E~a~s~n~,~v of this letter to Christopher Ruff at 263-7874 (fax). ~ ' ' Wendy-Mal, an ' - JUN 2 9 1998 AOGCC Alaska Oil & Gas Co s. Commission Anchorage FIAR-27-98 FRI 13:52 UNOCAL ASSET GP, S GRP ' '~ FAX NO, 907263,[~74 P. O1/O1 Unocal Corporation 909 West 9'~ Avenue, P.O. Box 19624/ Anchorage, Alaska 99519-6247 UNOCAL March 27, 1998 Wendy Mehan Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: Status of Unocal's Cook Inlet Injector Work Dear Wendy, This letter is to provide you with an update of the work conducted since om' January 23, 1998 letter which Blair signed granting time extensions for various wells. Testing or. svork was completed on the folI0..wi.'ng wells and the....rcsults of this work is listed: Anna 29-42: Well head inspection completed (no leaks), Varianc~ granted on 313/98. Baker 4: MIT passed on 2/15/98 by Lou Gfimaldi Brace 31-42: Coil Tubing operation completed to repair leaking cement plug, Pressure test completed. - GP 33-14RD: SI MIT successfully completed on 2/11/98. GP 22-13RD2: Variance granted on 3/17/98, MIT completed on 12/15/97. Grayling 16: Workover completed on 3/26/98. MIT Passed. Monopod A-SRD2: MIT passed on 1/28/98 by Lou Gfimaldi Testing or.work was attemmed on the followin~ shutqn wells and a time extension until. June 30, 1998 is requested to complete further work and testing. Anna 19-42 ' Scale cleanout of robing completed, fiutber testing scheduled to prove casing integrity. Anna 2%42: Scale eleanout of tubing completed, further testing scheduled to grove casing integrity. Anna 4642: Temp Survey mn on 2/17/98, survey should grove no flow and allow SI status. Baker 9: Mrr attempted on 2115/98, farther wireline testing scheduled to prove casing integrity. Monopod A-12RD2: SI MIT attempted, Temp Survey scheduled to prove no flow. Monopod A-29 : SI MIT scheduled to prove no flow/casing integrity King 4RD : WFL indicates possible casing leak, well shutin, further testing and workover scheduled. King 15RD: 'NFL indicates possible casing leak, well shutin, further testing scheduled. King 22RD: WFL indicates possible casing leak, well shutin, further testing scheduled. Grayling 5 : Workover/Redrill scheduled in current drilling schedule. Grayling 22 : Workover/Redrill scheduled in current drilling schedule. Grayling 28 : Workover/Redfill scheduled in current drilling schedule. Grayling 36DPN : Workover/Redrill scheduled in current drilling schedule. Grayling 40 : Workover/Redrill scheduled in cmrent drilling schedule. Unocal respectfully requests a time-extension until June 30, 1998 to complete the work on the above listed Anna, Baker and Monopod wells. The Grayling and King work will be executed per our current drilling schedule.~l~se call me if you have an)-questions or clarification on these issues. , ,- ~ k/[ L) Senior Reservoir Engineer Cook Inlet Wata'flood Managgfii~ Uii a ~*$ ~'~;~-':' .c0mm~ss~er} ,a. ncnorag~ Please acknowledge the approval of the time extension and your receipt of this letter by faxing back a signed copy of this letter to Christopher Ruff at 263 -7874 (fax). ~Vendykl~han' Dat~ ' - AOGCC FEB-13-98 FRI 12:27 UNOOflL ASSET GAS GRP FAX NO, 9072637874 P, 01/05 UNOCAL ) Christopher Ruff Senior Reservoir Eng. Unocal Corporation Unocal Alaska Resources 909 West 9th Avenue Anchorage, AK 99501 Tel: (907) 283-7830 Fax: (907) 263-7874 To: Blair Wondzell Fax: From: Christopher Ruff Date: February 13, 1998 Total Number of Pages Including This Sheet: Comments: 1) 2) 3) Please fax a signed copy of the attached letter to document the approval of the SI MIT on GP 33. 14RD Please fax a signed copy of the letter dated 2/9/98 to document that the Baker 12 variance which was granted on 11/23/88 is still in effect. Please send a signed copy of the letter dated 2/4/98 to document the approval of the $1 on the Bruce 5-86 well. FEB- 13-98 FRI 12:28 UNOCAL RE:SET G¢~S GRP FAX NO, 9072637874 Unocal Corporation Agricultural Products 909 West 9* Avenue, P.O. Box 196247 Anchorage, Alaska 99519-6247 Telephone (907) 263-7830 UNOCAL P, 02/05 Re: Granite Point 33-14RD Tubing Integrity Test Feb 13, I998 Blair Wondzdl State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Aachorage, AK 99501 Dear Blair: An injection test was nm on 33-14RD on February 11, 1998. 1" chicksan pipe, 1" turbine flow meter and 1" choke were hooked-up to the tubing, water was injcctcd down the tubing at a pressure not to exceed 3000 psi. Pressure readings were taken on the tbg, 9.5/8" csg and 13-3/8' csg ~wery two hours. Thc results from this test indicate that there is tubing/packer integrity and there is no conununieation to the 9-5/8" casing string. The well has been shut-in until a successful fishing job can be accomplished to remove obstructions in the tubing. We submit this well as having passed a Shut-In MIT. The well will remain shut.in until a fishing job and plumbing installation can be accomplished, at which time a request for an injection variance on a 10-403 will be submitted. Senior Reservoir Engineer Cook Inlet Waterflood Management Please return a signed and dated copy of this letter to document a passing Shut-In MIT for our records. Blair W-ondzcll Petroleum Engineer AOGCC Attachments: 7 day Shut-in MIT 2 hour Injection Test Wellbore drawing FEB-i3-98 FRI 12:28 UNOOAL ASSET GAS GRP FAX NO. 9072637874 P, 03/05 Procedure, for MIT on Shut-in Granite Point Injector 33-,!4 1. Record daily tubing, casing, and outer casino pressures for a consecutive throe (3) day period. , Bleed 200 psi off current 9-5/8" casing pressure. Bleed 100 psi off current 13-3/8" casing pressure. Record this pressure along with the date and time. Please note how long it took to bleed the pressure off each casing and indicate fluid type or gas. 3, Continue recording daily tubing, casing, and outer casing pressures for a consecutive seven (7) day period. 4, Fax completed form to Steve Tyler ~ 263-7874. Well#: 133-14 Bled press to- Date Time., Tubing Pressure 9-$/8",,Csg Pre,s,,,s~.,, 13,.318" .C, sg Press 8129/9'7'' 0800 0 235 220 8130197 0800 "'b ........ 238 ................. 220 ...... .. · 8/31i97 0800 ......... 0 ........... i!35 188 ,, , I IIIIII I I I i I I I I III 1 i .... ....... 1' I" 8/31197 0 75 J llJ Illl I I I II ii I IIII I I I I II Illllll [ I 911197 0900 0 160 20 .. 9/2i97 '0900 ................ 0 ...... 35' 25 9/3197 0900 .... 0 ......... 1DO .... 100 ~ '9J4/97 "0900 0 ...... 1~0 ......... 140 .... 91~1~'?" o9oo~' o ............ ~o '" ~0"' 9/(~/97 0900 ~ ............ 175 .............. '~'75 ' 9/7/97 0900 (~ ............. 185 ..... 18~ .... 918/97 '0900 ...... (~ .... '197 ' J 197 9/2/97 2" Plug was leaking on 13-318" csg. Fixed ~mc. 8/31/97 Bleed off info 9-5/8" csg took 2 mm to bleed off. Fluid type: water. 13-3/8' csg bled gas. It took a little more than one rain to bleed. FEB- 13-98 FRI 12:28 UNOCAL ASSET GAS GRP FAX NO, 9072637874 P, 04/05 33-14 TIME }_T.U___B_..I_N,G PRESSURE~ 9 5./8" CASING i 13 3/8" CASING ,"2_~98 ~.~.~';'.;.-,.~; ........... . ........................ ,..,.~ ................ 7: 00P. M. 0 248 258 1130 ............. 7:30 P.M. 2900 268 262 108 .... 8:00 p.M. 3i~-0- ............................ -~52 ....... 270 103 '9:00 P.-M" ' 3050 " 248 ..... 28'3 ....i0h -10:~0 ~.M, ' -- 2700 - 239-- 283 ................... §~5- .................. ii:00P.M, --: 2940 ' '239 -- 277 92 ......... ~ ..................................... ..~ 12:00 A.M. 2880 232 275 97 2-12-'98 ~~~.:.~.~:.~:`.~:.~`~:~.~:~:..~.~:~..~`~.~:~....;:~.~.`~:~..~...`.~.~..?.~:~:~.~:~.:~``.~:..~.~`~`~ ............... '~'"'";' .......... ~'""'"";"'""'~'~:': ....... F;;::?:,':.,;,, .;~.~.~;.~.~.?``.~.!~;~::~:..~:~..~;~;~:..~?~::`~`~.;.```::~:~v:~.;~:.?.``.?!.:..?;~:?~:;~ 1:00 A.M I 2900 230 272 , 94 2:00A.M, 2900 ... 229 -- ,; 272 3:00 A.M. 2890 22~ 272 ~ 92 4:00A.M, __ - 2S90 22-~ .... -27-2 ........ 5:00 A.M. z 3"~ '~"-. c z '.." z -> 7... ........... 8i'o0 A:M; [_.i ...... "Z~?5 ..... ¢~. .... : 76~ ....... ' .... 78 ............. 10:00 A.M.' ........... 12:00 P.M. 2:00 P.M. 4:00 P.M. ............... ..... 6:00 P.M. ........................ ~0:00 ~.M. 12:00 A.M. ....... , ................. ......................................... .................................................. .............. ...... ....................... . ..................................... ........ :.~ ~ : :'-'~ __ ............ ........ -, · .~'", f-. ,,% t,,.;; ;:;.~,, .:. ........................ ..... .................. ......... , ........ .............. ...... 1 .................... TEST3314 FEB-I..3-98 FRI 12:29 UNOCAL ) UIqOOC~L RKB to TBG Head · 311.20' Tree connection: f~SSET GP, S GRP F,qX NO, 907263787.4 P. 05/05 Granite Point Well # 33-14RD Completed 3/6/81 i i ii iiii ii ii i il _ i i iiii iiiii i i ijll iii CASING AND TUBING DETAIL SIZE WI' GRADE CONN II} TOP BTM. 13-318" 61.0 I(.-55 Btm. LT&C 12.515 Surf 4012' 9-518" 40 & 43,5 N-80 & 8-95 [{uti. LT&C 8.755 Surf 9164' 7" 29 P-110 ButL LT&C 6.184 8P12' 10,302' 5" 18 N-gO Bu~. LT&C 4.276 10,468' 11,410' Tubing: 3-1/2' 9.2 N-80 Duff 2.992 0' 10,387' 2-3/8" 4.7 N-gO [luff 1.995 ! 0,387 10,842' C-2 C-2 C4 15 ? KB ELEV; - t06' PBTD = 11,410' TD · 11,420' MAX HOLE ANGLE · 32' NO~. Deo,~h ,, ! 9859' 2 9898' 3 9899' 4 9902' 6 10,08~' 7 10,200' : 8 ' 10,201' 9 10,204' 10 10,309' 11 10,347' 12 10,386' 13 10,79~' 14 10,829' 15 10,1132' 16 10,841' b~m 10,842' 3.00 JI~WELRY DETAIL Item OCT 2 $taBe Unih~d Tb8 flange' ...................... Otis "XA" Sliding/leave Baker Mode{ "O.22" Loeator wi 80-40 Seal ,~y, 17.45 lng Baker Model "FB-I" Ret. Prod. Pkr. size 85-40 Miliout Ext. w/:~" 11rd X 3-1/2" [{utt. XO 3-1/2" Camco MMOW Mandrel w/'RW" Regulator. 3-1/2" Canto ]vilviOW Mandrel w/"Riked" Dummy. Baker Model "0-22" Loeator w/110-40 Seal Auy, 10.45 lng Baker Model "FB-I" Ret. Prod. lakr. size 85-40 Millout Ext. w/5" 8rd X 3-1/2' Butt. XO 3-1/2" Cam~o MMOW Mandrel w/"RW" Regulator. 3-1/2" Cameo MMOW Mandrel w/"Rik~" Dununy. ~ver, 3-1/2" Butt Box X 2.3/r' Butt Pin Otis 'X" Nipple Baker Model "O" Localot w/20-25 Seal A~sy, 10.45 lng Baker Model "FA-I" Ret. Prod. Pkr. Mule Shoe Fill Tagged on FISH: 2-11/16" Swedge, 8pangjars, hyd. jars, 10,400' of wira 10/10/88 (found notation on report a plan to pump acid down tbs to erode wire on 10/18/88) IY XO ~ 10.387' to 350' PERFORATION HISTORY Interval Accum. .... DateZone Top. Btm Amt; -~'Df Present c0nd!.t..!0.n _ 2/2~1 0,25o' g,~z z z s~ Pe..aa r/Bond 3/2/01 ¢2 10,00~ ...... 10:044' 44" "' 4' i0 ,l~n !/in,Je, ctio. 2./24/8t ...... 10,042' ~' 1~},044' Z" 4' Sqz Peffl [! Borld ' ~ 3n/"1 c2" 1o,3~ ~o,45,~~ .... 4' o~,f/...!~...~.'k~ ..... . 3/1/81 ¢5 ..... 10.490' "10,585' 95* 4' Open f/Injection , , 3/1/81 (:;,5 10,7t6' 10,756' 40' 4' Open l/Injection 3/1/81 C6 ' t1',044' 11,074' 30' ..... 4' ....... Open f/Injection , ,, ,, , ...... _33-14RD.DOC REVISED: 8/21/97 DRAWN BY: SLT $EP-09-97 TUF 09:27 Fax transmittal To: Fax Number: From: Date: Subject: Pages: Cover plus / 'i Comments: III II I I IIIIBII RECEIVED SEP 9 1997 Gas Cons..Commis~ ~ctiorage $EP-09-97 ?UE 09:27 UNOO(~L ~S$E? G~S GRP F(~× NO, 9072637874 P, 02/02 Pr. ocedure for M!.T on Shut-in, , Granite Point Injector 33.14 , . . Record daily tubing, casing, and outer casing pressures for a consecutive three (3) day period. Bleed 200 psi off current 9-518" casing pressure. Bleed 100 psi off current 13-3/8' casing pressure. Record this pressure along with the date and time. Please note how long it took to bleed the pressure off each casing and indicate fluid type or gas. Continue recording daily tubing, casing, and outer casing pressures for a consecutive seven (7) day period. 4. Fax completed form to Steve Tyler @ 263-7874. Bled press to- Well #: 133.14 Date Time Tubing Pressure 9,-$18" Cs9 Press. , 13-,31,8" cs9,press 8/29/97 oeo0 0 235 220 8/30/9'7 0800 ....... O' 238 220 ~ 8/31/97' 0800 .......... 0 ' ....... ~35 ..... 188 i IIIII IIiiii1_. II1[11 I I i ii1! I I I iljlllJllll I t o oo'"I o .... i ......... .... '1 ""' I II I I IIII II IIIII I I I I I Jill Illllllll Il IIIIIIIIJl IIIIL_ ~ I IIIIIIIIII II I I III II I II II 9/1197 0900 0 160 20 9/2/9~ 0~00 ............... 0 ..... 35 .... 25 9/3/97 0'900 ........... 0 ......... ~00 ..... ~00 ......... '"9/4197 0900 .... ,0. ,. 140 "140 ,,, 9/5/97 '0900 " 0 ........ 160 ..... 160 .... 9/6/97 0900 '"0 175 '175 917/97 '"0900 '0 . 185 '"185 ...... 9/8/97 0900 "' 0 ............. 197 '" 197 9/2/97 2" Plug was leaking on 13-3/8" csg. Fixed same. 8/31/97 Ble~! offinfo 9-5/8" csg took 2 rain to bleed off. Fluid type: water. 13-3/8" csg bled gas. It took a little more than one rain to bleed. RECEIV£D :,;'~P 9 199 .Oil & I~as Cons. ~c, lio. rage Atas~a Re,mn April 16, 1990 Alaska Oil & Gas Conservation C=~mission 3001 Porcupine Dr. Anchorage, A2f 99504 Attn: Ms. Elaine Johnson Dear Ms. Johnson: I have attached surface survey locations of ti~e "Legs" and conductors for the four platforms in t~e Trading Bay Unit as well as the Union Oil-operated Monopod and Granite Point Platforms. I was unable to locate any plats from a registered surveyor but I hope tkis will meet your needs. Yours very truly, Regional Drilling Manager GSB/lew GRANITE POINT PLATFORM FROM NW CORNER OF SECTION ]3, TION, RlZW CONDUCTOR Leg#1: Leg#2- Leg#3- Leg#4: "Y" COOR. "X" COOR. WELL # FSL 2,544,566.00 263,297.33 2,544,572.08 263,294.75 13-13 2371 2,544,572.41 263,299.33 44-14 2373 2,544,569.75 263,302.99 33-14 & RD 2371 2,544,565.34 263,303.99 31-23 2366 2,544,561.34 263,302.08 31-14 & RD 2362 1.& 2 2,544,599.42 263,297.83 44-11 & RD 2360 2,544,560.67 263,293.33 Open 2,544,564.50 263,290.83 12-24 2363 2,544'569.00 263,291.42 32-23 & RD#2 2368 2,544,610.00 263,364.00 Compressors 2,544,543.33 263,408.00 2,544,548.16 263,403.42 31-13 2382 2,544,549.91 263,407.59 22-13 2379 2,544,548.66 263,412.00 MUC#I-1 2391 2,544,544.99 263,414.41 MUC#I-2' 2386 2,544,540.42 263,413.91 32-13, 33-13 2390 2,544,537.25 263,410.58 24-13 & RD 2392 2,544,537.00 263,406.09 42-23X, 31-23 2380 2,544,539.58 263,402.42 11-24 2383 2,544,544.08 263,401.42 11-13 2379 2,544,499.58 263,341.33 FEL , , 1267 1262 1258 1256 1258 1261 1269 '1269 1370 1375 137.9 1381 1379 1376 1371 1368 1375 O~ STATE Of ALASKA ',~1 ALASKA ,' AND GAS CONSERVATION CO~ ISSlON SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator UNION 0IL COMPANY OF CALIFORNIA 3. Address PO BOX g247 ANCHORAGE AK 99502 4. Location of Well 2371'S & 1258'E of NW corner, Sec. l~, TiON, R12W, SM. 5. Elevation in feet (indicate KB, DF, etc.) __ KB 95' MSL 12. [ 6. Lease Designation and Serial No. ADL 18761 7. Permit No. 80-149 8. APl Number 50-733-20079 9. Unit or Lease Name UNION/MOBIL STATE #1 10. Well Number GPS 33-14RD / 11. Field and Pool MG~'~q~te. Poi0t/ looze ~enaz Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] - Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other :[~ Pull. Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). 1. Drld 6 1/8" hole to 11,410' TD. 2. Ran 5" 18# N-80 butt liner to ll,410'. 3. Cmt'd liner w/ 200 sxs cl "G". 4. Ran CBL-VDL-SIG-GR & CNL-GR logs. 5. Rerfed & sqz'd f/ 10042' to 10044' for isolation w/ 100 sxs cl "G". Rerfed "B"-zone f/ 10455' to 10390'. 7. Completed rest of well as originally permitted. j 14. I hereb~certify that the, foregging is tru~and correct to the best of my knowledge. S~gned~/~_~.~//_~//~~~ Tit,e District Drlg Superintendent · .e Conditions of App/oval, if any: /',5 Date ~ 2/25/83 By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate February 16, 19 83 Union Oil Company of California P.O. Box 6247 Anchorage, Alaska.,9 9502 Res ~ubsequent Reports, Sundry ~otices and Reports on Wells (Form 10-403) For the following lists of "Notice of Intention To:" Sundry Notices and Report on Wells (form 10-403) this office does not have on record the "Subsequent Report of z" defining the action taken on the approved, intention. Please advise this office by Subsequent ~.eport of the disposition Of the intention. Union Date - ~Br. iLef Description. of ._Int.~ntion TBU G- 8RD 10 / 1 / 80 TBU G-SRD 10/1/80 TBU G-2 3RD 10/1/80 TBU A-11L 10/1/80 TBU F.-4 PD 11/6/$0 GPS 33-14~D 2/11/81 ~BU 13-8 6/1/~1 TBU D-9 6/8/81 TBUS C-27 11/25/81 TBUS G-6 1/20/S2 TB-U D-6RD 3/18/~2 TBU G-7 4/21/~2 TBUS G-2 5/24/82 TBUS G-3 6/30/~2 K-1RD 7/14/82 Re~.erforate C-3, C-4 Reperforate B-l, B-2, B-4 Reperforate B-5, B-l, B-4 Reperforate Reperforat e Perforate B zone Clean out, reperforate. Plug & abandon for sidetrack Pull tubing, ruperforate Squeeze cement to abandon hemlock Change kickoff point Reperforate Revise setting abandonment retainer Repair casing Perforate Sincerely, -- '~onnie C. Smith Commissioner LCS/JKT/g lh ) Mr. l~obeE~ C. ~ar~hen ~n~ou 0il Company of Galifornia P. O. Box 6247 .0 Anchorage. Alaska 99502 April 22,. 1982 Hissing Informs=ion - Completed Wells Dear Bob = We vish to b~ng Co your attention that the below-indicated material on the folloving Union Oil Company veils has not yet bees received by the Alaska Oil and Cas ~onservation Commission~ -DIL/SP & CBL/VDL Else. Lo~s. S/2/82 -Dl$itized ~. Log Tape Trading ~ay Unit tB-16RD Trading B~y Unic ~D-17~D Trading Bay 518181 612218.1. 5/22/81 -glee. Logs -DtEeeC~onal Survey -well History Trading Bay St. ~A-9RD 5/6/8l -Directional Survey -Di$itized ]~. Log Tape T~adin8 Bay St. ~A-17RD Cannery Loop. Unit Kenai Uni~ #34-32 7/3/81 9/13/SI 1/lS/82 Log Tape Log Tape -Digitized E. Log Tape -Certified Survey Plat -Directional Survey -DST or Prod. Test-~epor~s Trail Ridge Unit 12/13/80 -Certified Survey Plat Please submit the above material at your earliest convenience since you are nov in violation o~ Title 20, Chapter 25 of the Alaska Admin- istrative Code. Yery ~?ly}~urs, ~illiam Van Alen Petroleum Oeologiat WVA~vdl ~ALASK,~ LAND GAS CONSERVATION C MISSION IVELL COMPLETION OR RECOMPLETION REPORT AND LOG . . -t. Status of Well , ~ . Classification of Service Well :OIL [] GAS [] SUSPENDED [] · 'ABANDONED [] SERVICE ~ . WATER INJECTOR 2. Name of Operator 7. Permit Number ' . .- . UNION 0IL COMPANY OF CALIFORNIA 80-149 3. Address 8. APl Number PO BOX 6247 ANCHORAGE AK 99502 50-733-20079-01 9. Unit or Lease Name 4. Location of wellatsurface 2371 'S & 1258' E of the NN Corner, Section 13, T10N, R12W, SM UNION-MOBIL STATE #l 10. Well Number At Top Producing Interval 1604' N & 1728'W of the SE Corner, Section 14, T10N, R12W, SM GPS #33-14 RD 11 Field and Pool At Tota~ Depth 1500'N & 1507'W of the SE Corner, · Section 14, T10N, R12W, SM -5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. GRANITE POINT- 95' KB above MLLWI ADL 18761 MIDDLE KENAI 12. Date Spudded 13. Date T.D, Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 12/27/80 K.0. 2/18/81 3/6/81I 70 feetMSLI 1 '17' l°tal Depth (MD+TVD)1410,, 10657' TVD18'Plug Back Depth (MD+TVD)__ YES,~19' Directi°nal SurveYNo[] I 20' Depth where SSSV set__ feet MD I21' Thickness Of PermafrOst___ 22. Type Electric or Other Logs Run DLL/SP, CBL-VDL-SIG-GR, CNL-GR, SDC GYRO 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 18" 70_59 B Surface 561' 22,, 736 sx -- 13 3/8" 61 J-55 Surfa£~ 4012, 1 ~,, 22.~1 ~× -- 9 5/8" 40 & 43 ~""~9 I -- ' .,:$ 5&N-80 Surface 9164 12 1/4'.' 7" 29# P-110 8912' 10505' 8 1/2" 400 sx Milled win(low in 9 5/8" csg 5" 18# N-80 10468'. 1.1410' 6 1/8" 2no sx 9169~q?lR'..Knp 9169' 24. Perforations open to Production (MD+TVD o,f Top and Bottom and 25. TUBING RECORD i.nterval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 11246Ll1230' 4 HPF- 4" (10503-10488'TVD) 3 1/2" 10832' 9898, 10200, 10830 11194-11104'"" ' (10453-10368'TVD) .. 11074-11044'" " " (10339-10311 'TVD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10756-10716'" " " (10033-9994'. TVD) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10585-10490'" " " ( 9864'-9771' TVD) 10042-10044' 100 sx 10455-10390' 4 HPF- " ( 9735-9670' TVD) 9250-9251' 100 sx 10044-J0000' 4 HPF- " (9325-9281' TVD) 4003-412!' 400 Sx - . . , . . 27. PRODUCTION TEST Date F, irs~ Production i Method ,of. Operation (Flowing, gas lift, etc.) NoneI InjeCtion Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs'-MCF WATE'R-BBL CHOKE SIZE IGAS-OILRATIO 3/20/81 " TEST PERIOD * I Flow Tubing Casing Pressure CA.LCIJ.LATED OIL-BBL' GAS-MCF. WATER-BBL OIL GRAVITY-APl (corr) · Press.. 5.825 250 24-HOUR RATE I~ ~ 537 BWPD Injection 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED . Alllkl1011 & (~U Corm. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29., ; i .... ,' .~.': ',.. :., "~'.- '-. '*: ....... :' "~ ?' ' ""' GEOLOGIC MARKERS FORMATI'oN TESTS NAME .... Include interval tested, pressure data, all fluids recovered and gravity', MEAS. DEPTH TRUE VERT. DEPTH GOR, and time ~'each.phase. . Middle Kenai 9985' 9266' "A" Interval · · Middle Kenai 10378' 9658' NONE , "B"- Interval Middle Kenai 11037' 10304' "C" Interval · , · 31. LIST OF ATTACHMENTS , 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS 'General' This form is designed for submitting a complete and correct well completion report and log qn all types of lands .and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal,.water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where' not otherwise shown) for depth measurements' given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form fe:r each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate Whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached .supplemental records for this well should show the details of any multiple stage cement- lng and th~ 'location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 1 O-407 ' RECEIVED I I I%%] ~,i, ION OIL. CO. Oi- C&LIJ:O'RNJA FEB ~ WELL J~CO~D ~as~ 0il & Gas Cons. Cmml~j0~ .% ..... Union-Mobil ~~a~ WELL NO 33-14RD i;'~D!,D.. Granite Point LOCATION. 2371'S & 1258'E of the N.W. Corner, Section 13, T10N, 'R12W, S.M. PEI~MIT NO. 80-149 SERIAL NO. 733-20079-01 SPUD DAT : CObITI~ACTO~. Parker TYPE UNIT. Wilson 120H 19. , DRILL P1PE DESCRIPTION 5" 5~ ELF;VATIONS: WATEIL DE~I'H ~ T. TO OCEAN FLOOB -~IZE V;EIGH? THn~&D GRADE D[]PTH " IRE[4ARkS ' 18,, i'~0i-59# Line Pipe B 561' See O~iginal HistorY 1.-~-3/8" 619 Buttress J-55 4012' See Original Hisfiory -- 9 5/8" 40#& 43.[BLTC&STC $-95&N-80 9i64" 1'00 sxs w/additiVes 9 3/8" wind~w'"f/9164' t/gRl-g. 7" .... 29~ , Buttress p-110 ..... 10505' 400 pXp.2/additives-TOL @ 8912, 5'___'_ 18~ ~u~tress N-80 11410' 200 sxs w/a~ditives TOL ~ '10468'' ...... 3' ½" 9.3# 3utt N-80 10387' Pkrs @ 10200' and 9899' -- ~ 4.7# Butt ~,80., 10'842' Pkr ~ 10830' top of 2 3/8" @ i0~87' PERFORATING RECORD / _J~.ATE JI~T~L E.T~D.. ~L ...... P~T CONDITIQJ[ .2r09-80 9174'-9176' 9280 TO Squeeze 9 5/8" s. Prior ~0 m~lling windo~ ..... .~-10?~Q 9228-=~30' ~280 To. Squeeze for redrill. Sqz'd w/300 sxs "G" 2-24-81 1Q042'-10044' 9958 isolation 4 HPF isolation squeeze at base o~ "A" zone ...... 2-25-81 9250'-9252' 9155 isolation 2' LaP.. %-01_____z~ 11~46,-11230'~- i1~406 -injection "C" zone w/~ HP~.. 4~ · Open for injection ~-0&-81 11194'-11104' 11400 igjecti°n "C" zone w/4 hPF..4" Open for injection 3-01-8~ 11074'-11044' 11400 i~jection... "C" zone w/~ HPF. 4" Open-for injection 3-01-81 10756'-11716" 11400. injection the "B" zone w/4 ~PF. 4" Open for injectio~ 3-01-81 10585'-10490' . 11400 injection ' the "B" zone w/4 HPF'. 4" Open for injection 3r02rS1 10455"-10390" 11400. injection 'the "B".zone w/4 HPF. 4" Open fo~ injection -- 3-02-81 10044'-10000' 11400 injection Jthe "A" zone w/4'HpF..4'' Open~ fOr injection · . . ., ., , INITIAL PRODUCTION DATE Il' IHT~BVAL ..~OIL 'CUT GRAV. C._P. T.P. I C~O~.___~ ~CF ~-26-81.NoI p'roduction-v,ater injection 712 BW PD. @ 5800 psi .-5-81 No production-~,ater injection 779 BW PD @ 6075 psi · ,, WELL PI~D_A_$ S E M ttLY TYPE: oct .' · . CASING HEAD: nc_m ,N~-U~.AD 20 1/4". 2000 pSi a ,.13 i 5 /8 ' ' 5 ~ 0 0 psi CASING HANGER:__ 13'5/8" x 9 5/8" Buttress' Fluted Csg. Hanger '' CASING SPOOL: TUBING HEAD:. 13 5/8" 5000 psi UNI-HEAD · 1~ 5/8" 5000 ps'i UNI-HEAD ' TUBING HANGER:_ .Dua. 1 3 1/2" Buttress TUBING tIEAD TOP: 3" EUE MASTER VALVES: ,,,3, ~/8'' 10,000 psi CI-Ill!STMAS TRI£E TOP CONN.:__ 3:_1/2" EUE S~EET D PAGE No, UNIO~'t OIL CO~ANY OF CALIFORNIA WELL RECORD. LEASE Union Mobile State #1 %£~ ~, ~'~' ~-~ '~ FIED Granite Point ];)ATE ~op 11,408.39 11,366.79 11,366.04 11,324.45 11,323.70 11,283.18 11,282.43 10,494.54 10,493.68 10,491.93 10,483.31 10,473.86 10,467.72 Bottom 11,410.00 11,408.39 11,366.79 11,366.04 11,324.45 11,323.70 11,283.18 11,282.43 DETAILS OF' OPERATIONS,' DESCRIPTIONS' J[ RESULTS 5" Casing Detail Granite Pt. 33-14 R.D. 2/19/81 Length Description 1.61 41.60 .75 41.59 .75 40.52 .75 787.89 B.O.T. 5" Float Snoe 1 Jt. 5" 18# N-80 Butt Csg B.O.T. 5" Bloat Collar 1 Jt. 5" 18# N-80 Butt Csg B.O.T. 5" Plug Catcher 1 Jt. 5" 18# N080 Butt Csg B.O.T. 5" Landing Collar 19 Jts. 5" 18~ N-80 Butt Csg 10,494.54 10,493.68 10,491.93 10,483.31 10,473.86 .86 1.75 8.62 9.45 6.14 B.O.T. XO Bushing B.O.T. Cent Bushing B.O.T. 5" Liner Hanger B.O.T. 5" Spacer B.O.T. 5" Tieback Sleeve Top Liner 10,467.72 e 3, I 6. e OTHER EQUIPMENT Baker Model "G-22" Size 80-40 Locator w/ 20' seal assembly and guide shoe @ 9898'. Baker Model "FB-I" pkr size 85-40 @ 9899' (7"X4"). 3-1/2" Butt Mule Shoe @ 9916'. 5" Millout extension @ 9902'. Baker Model "G-22" Size 80-40 Locator w/ 10' seal assembly & guide shoe @ 10200'. Baker Model "FB-I" pkr size 85-40 @ 10200' (7"X4"). O' 38' 3-1/2" Butt Mule Shoe @ lO211'. 18" Casing @ 602' ~ 1~3'-3/8'' Casing @ 4012' Otis 3-1/2" "XA" Sliding Sleeve @ 9859' ~9-5/8" Top of Window @ 9164' 8. 5" Millout extension @ 10203'. A 9. Baker Model "G" Locator Size Zone ~ 20-25 Locator w/ lO' seal I assembly and guide shoe @ 10829'. I lO. Baker Model "FB-I" pkr @ 10830' , (5"X2.5'). Camco 3-1/2" "MMG" Mandrel "RW" Regulator @ lOO15' Camco 3-1/2" "MMG" Mandrel "RKED" Dummy @ 10085' '-' 11. Bottom of Mule Shoe @ 10842'. B Zone IlO Camco 3-1/2" "MMG" Mandrel "RW" Regulator @ 10309' Camco 3-1/2" "MMG" Mandrel "RKED" Dummy @ 10347' 7" Liner @ 10505' top at 8912' Otis 2-3/8" "X" Nipple @ 10797' C Zone Mule Shoe @ 10842' 5" Liner @ ll410' top at 10468' DAt~E . WELL SCHEMATIC UNION-MOBIL STATE #1 33-14 RD SCALE CKD. ~ FOR~4 247 (NEW 8/§6J UNION OIL COMPANY OF CALIFORNIA SHEETS j ~HEEt' SHEET D PAGE Ilo. UNION OIL Ct~ANY DF CALIFOI~4IA LF~E Union Mobile State #1 WELL RECORD ,.. ~~. ~.~. ~-~'~ ~ FIELD Granite Point DATE ElD DETAILS OF' OPERATIONS,' 'DESCRIPTIOn, IS ~ RESULTS · Top 10,503.15 10,460.42 10,458.72 10,417.37 10,416.42 8,951.16 8,950.30 8,940.21 8,918.84 8,912.31 Bottom 10,505.00 10,503.15 10,460.42 10,458.72 10,417.37 10,416.42 8,951.16 8,950.30 8,940.21 8,918.84 7" Csg Detail GP 33-14 RD Length 1.85 42.73 1.70 41.35 .95 1,465.26 .85 10.10 21.37 6.53 Description B.O.T. 7" Butt Float Shoe 1 Jt. 7" 29# P-110 Butt Csg Baker 7" Butt Float Collar 1 Jt. 7" 29# P-110 Butt Csg B.O.T. 7" Butt Plug Catcher 35 joints 7" 39# P-11p Csg B.0.T. 7" Dent Bushing B.O.T. 7" Liner Hanger 7" 29# P-110 Csg Extension B.O.T. 7" Tieback Sleeve Top Liner 8,912.31 UHIOII OIL Ca:PAth' CALIFOPCIIA %NELL RECORD SI-:E F D PAGE --- _ LEASE Union Mobile State #1~ DATE I ETD ] 'ELL H0, 33-14 PI) FIELD Granite Point DETAILS OF OPERATIOI'tS, DESC'RIPTIOI!S &RESULTS Tubing Detail From To 10842.33 10840.50 10830.00 10830.00 10829.00 10828.15 ." 10797.27 10796.62 10795.91 10387.46 10387.12 10386.40 , 10354.84 10346.64 10316.90 .10308.70 10215.74 10215.06 10211.98 10211.31 10200.86 10203.54 10200.86 , 10200.41 10105.65 10093.20 10985.00 10023.10 '10014.90 9920.84 9920.16 9917.00 ' 9916.33 9898.88 9901.56 9898.88 9898.43 9893.28 9862.36 9859.06 9858.34 39.60 38.20 10840.50 10830.00 10831.82 10829.00 10828.15 10797.27 10796.62 10795.91--' 10387.46 10~87.12 10386.40 10354.84 10346.64 10316.90 10308.70 10215.74 10215.06 10203.51 10211.31 10200.86 10203.54 10200.86 10200.41 10105.65 10093.20 10085.00 10023.10 10014.90 9920.84 9920.16 9901.56 9916.33 9898.88 9901.56 9898.88 9898.43 9893.28 9862.36 9859.06 9858.34 39.60 38.20 --0-- Length 1.83 10.50 1.82 1.00 .85 30.88 .65 i .71 408.45 .34 .-.72 .31.56 8.20 29.74 8.20 92.96 .68 11.55 .67 10.45 2.68 .45 94.76 12.45 8.20 61.90 8.20 94.06 .68 · 18.60 , .67 17.45 2.68 .45 5.15 30.92 3.30 .72 9818.74 1.40 38.20 JTS . 13 322 Description Mule Shoe Seal Assembly Size 20-25 Baker "FA-l" Pkr. (413-07-3230) Baker Mod "G" Locator Size 20-25 XO 2 3/8" Butt. Box x 2 3/8" 8rd Pin 2 3/8" Butt. Tbg. Otis X Nipple 2 3/8" Butt. Collar 2 3/8" Butt. Tbg. XO 3 1/2" Butt. Pin x 2 3/8." Butt Pin 3 1/2" Butt. Collar 3 1/2" Butt. Tbg. Camco MMG. ~m~lrel Riked .. 3 1/2" Butt. Tbg. Camco MMG. Mandrel "RW" Reg. 3 1/2" Butt. Tbg. XO 5" 8rd Box x 3 1/2[" Butt. Pin 5" Csg. Millout Extension End of 2nd Pkr. Assembly 3 1/2" Butt. Mule Shoe Seal Assembly Size 80-40 Baker Mod. "FB-i" Pkr. Size 85-40 Baker Mod. "G-22" Size 80-40' Locator 3 1/2" Butt. Tbg. 3 1/2" Butt. Pup. Camco MMG. Mandrel "Riked". 3 1/2" Butt. Tbg. Camco ~-~G Mandrel "~" Regulator 3 1/2" Butt. Tbg. XO 5" 8rd Box x 3 1/2" Butt. Pin 5" Csg. Millout Extension End of Top Section Pkr. Assy 3 1/2" Butt. Mule Shoe Seal ASs' y Size 80-40.,. Baker Mod. FB-1 Pkr. Size 85-40 · . Baker Mod. "G-22" Size 80-40 Locator 3 1/2" Butt. Pup.' '. 3 1/2" Butt. Tbg. Otis XA Sleeve ~' 3 1/2" Butt. Collar 3 1/2" Butt. Tbg. .. Elevation RKBTo Landing Head D IJHIC!I OIL CCI'PF;,'Y CF CALIFCPCIIA 11 · ~SE Unio~-M0bile State #1 I'~LL IlO, 33-i4 :~D FIELO Granite Point 2~TE 11/25/8 ., 2 11/26/~ 3 11/27/~ 5 11/29/8 6 11/30/8 7 12/1/80 8 12/2/80 11,473' TD 11,470' ETD 9 5/8" C. 9 7" f/9360't 0 11,473' TD 11,470' ETE 9 5/8" C. S 7" f/9360' 11,473' TD 11,470' ETE 9 5/8" C. 9 7" f/9360' · 11,473'. TD. 11,470' ETD 9 5/8" C. 9 7" f/9360' 11,473' TD 11,470' ETD 9 5/8" C. 9, 7" f/9360' 11,473' TD 11,470' ETD 9 5/8" C. 9. 7" f/9370' 11 150 11,473' TD 11,470' ETD 9 5/8" C. 91 -7" f/9360' 11,150 11,473' TD 11,470' ETD 9 5/8" C. 95 7" f/9360' t 11,150 DETA'LS, OF OPEP~Ti~'e~,,o, DESCRIPTICilS g RESULTS Commenced operations 00:01 hrs. 11/25/80. Circ. well dead w/F.I.W. Installed BPV. Removed tree. Installe~ and 557' tested BOPE. Pulled and layed down complete 3½" injection )11,150' string. Tubing was split open @ 571', failed in burst. Picked up 3N" 2 drill pipe. RIH w/8~" x 7¼" B.O. shoe #1 w/PRT stinger dressed_.with 5" grapple. 557' to 11,150' Tagged 9 5/8" Otis packer @ 9246'. Mixed W.O. fluid & milled on pkr. Pooh. 557' to 11,150' ~. x ~ '0. ,~hoe. ~. Milled on pkr. Trip for. B.O. shoe'#3. Milled on' pkr. J57' :o 11,150' Pkr. came free. Pooh. RIH w/5" spear. Engauged packer. Pooh. Recovered Otis 9 5/8" perm. pkr. wit~,i6' seal bore i57' ext. :o 11,150' i57' ~o RIH w/pkr, bore mill. Tagged pkr. @ 9291' & ¢.0. pkr. bore. Pooh. RIH w/pkr.'picker. Engauged pkr. @ 9291'. Milled on pkr. Pkr. moved but would not come out of hole. Released f/packer & Pooh. RIH w/B.O, shoe. Milled on pkr. @ 9291'. Trip for new B.O. shoe. Milled on pkr. @ 9291'. ~O 57' Pooh w/B.O, shoe. Recovered bottom slip cone in the burn over shoe. RIH w/5" spear. Attempt to engauge packer @ ~ 9291'. Set 15M# on packer and packer ran down hole.' Chasec packer to 9363'. Pooh. No recovery. Indications of junk on top of packer. RIH w/8½" x 7¼" B.O. shoe. Milled on packer f/9363' to 9365'. ~Circ. high vis. sweep. Recovered 1 cup of rubber and 1 cup of junk packer pieces over shaker. . . Pooh & recovered packer rubbers'and brass ring inside of B.O. shoe. RIH w/6" grapple. Engauged packer. Pooh. Recovered entire packer. RIH w/3 3/4" pilot mill on 3~1/8'' PRT ext. Tag packer @ 10,168'. Couldn't work into packer. Pooh. RIH w/6" x 4 3/4" B.O. shoe. Shoe ~topped @ 9660' - casing damage? U iICl OIL Pi,7 CF CALIF ? 'IIA I,ELL L~r~SE Union-Mobile State #l I': LL IlO, FIELD Granite Point DATE ETD DET,\';,_o <' OF OPEP. ATICNS, DESCRIPTIO~IS & RESULTS 9 12/3/80 10 12/4/80 11 12/5/80 12 12/6/80 13 12/7/80 11,473' TD 11,470' ETD 9 5/8" C. 9. 7" f/9360' 11,150 11,473' TD 11,470' ETD 9 5/8" C. 9~ 7" f/9360' 11,150 11,473' TD 9755' ETD ( 7" f/9360' 11,150 11,473' TD 9755'~ ETD(c~ 7" f/9360' 11,150 11,473' TD 9755'ETD(csl 7" f/9360' · 11,150 57' o 57' Pooh - left bottom 3' of B.O. shoe in hole - parted. RIH w/5" grapple. Engauged B°.O. shoe. Pooh. Recovered B.O. shoe. RIH w/5 7/8" taper mill. Mill stopped @ 9654'. (6' higher-than 6" B.O. shoe had stopped). Milled on csg. 1/2 hr. Pooh. Mill had indications of running on + 5" rest- riction. RIH w/6" casihg roller. Rolled casing @ 9654' for 1 hr. Torque severe and made no progress in 1 hr. Pooh. RIH w/5 7/8" taper mill. Milled on casing f/9654' to 9656'. Mill came fCee. RIH to 9662' & tagged up again. Milled @ 9662' for 1 hr. NOTE: Casing damage in 33-14 during "1972" work over indicated @"the following intervals: 9670' to 9680' 10078' to 10087' 10168' to 10180' 10746' to 10800' All the above were swedged out'w/5 15/16" swedge & then rolled out w/6" csg. roller. Milled @ 9662'. Pooh. Jars had backed off. RIH w/5 7/8" O.S. w/4 3/4" grapple. Pooh. No rec. RIH w/5 7/8" short catch O.S. w/3' ext. above grapple. Engauged fish @ 9662'. Pooh. Recovered fish. RIH w/5 7/8" mill. Milled casing from 9657' to 9668'. Ran in to 10,058'. Milled f/10,058' to 10,063'. Ran in to 10,093'. Dressed out 7" liner w/5 7/8" mill f/10,093' to 10,095', sg. damage) 10148' to 10,151'. Tagged packer @ 10,172'. Pooh. o RIH w/6" mill and dressed out 7" line~ f/9652' to . 9664', 9740' to 9744', 9987' to 9989', 10,023' to 10,026', 10,056' to 10,064' and 10,146' to ·10,154'. ,. ·Tagged.packer @ 10,172'. Pooh Mill 1/8" out of gauge. RIH w/6" taper mill. Had slight 'burr on way in @ 9655.'. g.dam.) Tagged packer @ 10,172'. Pooh. RIH w/5 3/4" burn over shoe. o Set down @ 9655' w/15M#. Rotated B.O. shoe w/7 to 10M#. Pooh. B.O. shoe was splayed to 6¼". RIH w/5 3/4" impress- ion block. Set down 35M# ~ 9662'. Pooh. I.B. had indic- ations of parted pipe. RIH w/6" taper mill w/6" string mill 2½' up. .dam) O Dressed out 7" f/9652' t° 9662'. RIH to 9674' and set down. Circ. btms up. Recovered large amount of coal over shakers. Pooh. Tools indicated they were out of casing2 RIH w/5 '7/8" taper mill to 9665' - couldn'.t enter casing below damaged interval. Pooh. RIH w/5 3/4" I.B. set down @ 9755'. Pooh. I.B. indicates parted pipe and had run outside of casing. 3 'D" UHIO!I OIL CO' CF CALIFC 'IIA I,ELL i' rnt:n lSE Union-Mobile State #1 FIELD Granite Point D. ATE ETD [ DETAILS. OF .OPEP. ATI'''~'~,,',,,, DESCRIPTIOiIS a RESULTS 14 12/8/80 15 12/9/80 16 12/10/8~ 17 12/11/8( 11,473' TD 9347 ' ETD 9 5/8" C.95~7' 7" f/9360' o 11,150 ll,473' TD 9280' ETD(ct 13 3/8"C. 9 5/8" C. RIH w/8½" bit & 9 5/8" scrpr, to 9367'. Circ. clean. Pooh. .t. ret) RIH w/Baker "K" cmt. ret. Set ret. @ 9335'. PresSure tested 9 5/8" csg. f/surface to 9335' to 4000 psi - OK. Pressured up annulus to 2500 psi.. Pumped down d.p. to 6800 psi' annulus" press. Increased-to 3150. Broke down "A", "B" & "C"zones @ 7400 psi w/3 to 4 CFM. Formation , - held 6800 psi after pdmps off for 15 min. Bled off d.p. & annulus press.,'/came up to 3950 & equalized w/d.p. Bled both to 0. Retested 9-'5/8" annulus above ret. to 4000 psi - OK. Held 4000 psi on back side & pumped into formation @ 2 to 3 CFM @ 7400 psi. Annulus press, increased to 4300 psi. Bled off thru choke maintaining a maximum of 4300 psi on annulus while pumping. Shut down pumping & bled off d.p. to 0 & retainer failed and ran down hole to 9347'. Ran and set Baker "K" cmt. ret-. @ 9280'. Tested d.p. & t.ret) lines to 7000 psi. Tested annulus to 4000 psi. Attempted 12' tO break down formation below ret. with 7500 psi. Holding i7' 4000 psi on back side. Formation bled to 6700 psi. 20 min. after pumps off. Pooh. Ran Go W.L. w/2' gun w/2 HPF. Tag- ged ret @ 9282' WLM. Ran collar log Collar @ 9267' : 9226' 9184' 9142' 9100' 9057"& 9015' Perf'd 9 5/8" csg. f/9174' to 9176'. (will cut window f/9164' to 9224'). RIH w/Baker ret-a-matic' Set tool @ 9120'. Pressured up annulus to 4000 psi. ~Broke down perf's f/9174' to 9176' w/3/4 BPM @ 5400 psi. Released tool & move4 up hole to 9040'· Sqz'd perf's f/9174' to 9176' w/200 sxs. Cl. "G" w/.5% D-19, 1.0% D-31 & .1% D-6. Initial rate 1½ BPM @ 5250 psi, final rate 1¼ BPM @ 6700 psi. Sqz. held 4100 psi 10 min. after pumps off. CIP 22:00 hrs. 12/9/80. 11,473' TD 9280' ETDI 13 3/8" C. 9 5/8" C. Held p~ess, on sqz.'for 3 hrs. Released tool - Rev. clean :.ret) & Pooh. RIH w/8½" bit. C.O. cmt. stringers.f/9058' to ' 9113' & hard cmt. f/9113' to 9194'. R.I. to ret. @ 9280'. i7' Circ. clean & ~ooh. Go W.L. perf'd 8 holes f/9228' to 9230'. 11,473' TD 9250' ETD 13 3/8" C. 9 5/8" C. 57' RIH & set sqz. tool @ 9035'. Broke down perf's f/9228'-to .ret) 9230' w/3 CFM @ 6750 psi. Tool failed & communicated with~ annulus. Trip & changed ret-a-matic. Set tool @ 9025'~ Pressured annulus to 4000 psi. Broke down perf's f/9228' to 9230' w/1½ BPM @ 6500 psi. Sqz'd perf's f/9228' to 9230' w/100 sxs. cl. "'G" w/.5% D-19, .75% D-31 & .1% D'6. 'in~tial rate 1½ BPM @ 5800 psi, final rate ¼ BPM @ 7000 psi. CIP @ 20:00 hrs. 12/11/80. Held press. 1 hr. Released press. Rev. clean & Pooh. UNIO:I OIL CC '?A h' CALIFOPJ IA Eli RECORD SH -T D PAGE ih, 4 L~ASE _ 'union-Mobile state #1 DATE 18 12/12/80 19 12/13/80 20 12/14/80 21 12/15/80 22 12/16/80 23 12/17y80 24 12/18/80 25 12/19/80 26 12/20/80 27 12/21/80 28 12/22/80 ETD 11,473' TD ~9280' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" C. 9557' ~1,473'- TD 9280' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" C. 9557' , 11,473 ' TD - 9280" ETD (cmt.ret.) ~3 3/8" C. 4012' 9 5/8" C. 9557' 11,473 ' TD 9174' ETD (¢mt.ret.) 1.3 3/8" C. 4012' 9 5/8'.' C.'9557' 11,473 ' TD .9178' ETD (cmt.ret.) 13 3/8" C. 4912' '9 5/8" C. 9557' 11,473' TD 9180' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" C. 9557' 11,473 ' TD 9195' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" C. 9557' 9195' TD 9280' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" Window f/9164' to 9214~ 9 5/8" C.. 9557' 9211' TD 9280' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" Window f/9164' to 9214' 9 5/8" C. 9557' 9218' TD 9280' ETD (cmt.ret.) 13 3/8" C. 4012' 9 5/8" Window f/9164' to 9214' 9 5/8" C. 9557' 9280' ETD (est. TOC) ,13 3/8" C. 4012' 9 5/8" Window f/9164' to 9218' (54') 'ELL NO, FIELD Granite Point DETAILS_OF OPEPAT_IOItS, DESCRIRTIOI!S &,,RESULTS Completed Pooh. RIH w/8~" bit. C.0. hard cmt. {/9137' to 9239' & stringers to 9280' Circ. clean. f Pooh, laying down 3½" d.p. Picked up 5" d.p. Built gel mud fOr section.' Pooh. RIH w/section Mill #1. Cut window in 9 5/8" csg. f/9164' to 9171'. (Mill #1 7ft. in 7 hrs., 1 FPH). Pooh. P.U. Mill #2. RIH. ThaWed out Kelly & swivel. Milled 9 5/8" csg. f/9t71' to 9175'. Trip for Mill #3..Milled 9 5/8' csg. f/9175' to 9178'. RIH w/Mill #4~ Milled ~ 5/8" csg. f/9178' to 9179'. Trip for Mill #5. Milled 9 5/8" cm~. f/9179' to 9181' w/Mill 05. Trip for Mill f6. Milled 9 5/8" csg. f/9181 to 9195'. RIH w/Mill #7. Plugged tool. Pooh. Changed tool. (Orfice was broken). RIH w/Mill #8. Milled 9 5/8" csg. f/9195' to 9205'. Trip for Mill #9. Mi~led 9 5/8" csg. f/9205' to 9212'. Trip for Mill #10. Milled 9 5/8" csg. f/9212' to 9214'. Milled 9 5/8" csg. f/9214' to 9218' w/Mill #10. Pooh. R%H equalized DOp through OEDP hung at 9280' w/200 sxs CL "G" w/10% sand a~d~3% R-5. CIP 22:00 hours 12-22-80. · SHEEr D PAGF UNIO 'I OIL CO PANY OF CALIFORNIA RECORD. LEASE Union Mobile State #1 WELL NO, FIELD _ Granite Point DATE "DETAILS OF' OPERATIONS,' DESCRIPTIONS'[ RESULTS 29 12/23/80 9050'/86' 13 3/8" C. 40.2' 9 5/8" Window F/ 9164' to 9218 (54') WOC RIH w/8½" bit. Tagged CMT @ 8711'. C.O. CMT to 9050' POOH. 30 12/23/80 9050'/86' 13 3/8" C..40 2' 9 5/8" WindOw F/ 9164' to 9218 (54') Shut down'rig for X-Mas @ 06:00 hrs. 12/24/80. 31 12/26/80 9169'/86' 13 3/8" C. .2' 9 5/8" F/ 9164 to 9218'(54') 32 12/27/80 9169'/86' 13 3/8" C.; L2' 9 5/8" F/ 9164' to 92 (54') 33 12/28/80 9250'/86' 13 3/8" C. 4 .2' 34 9 5/8" 9164' to 9~ 12/29/80 9250'/86' 13 3/8" C. 4 9 5/8" 9164 ' to Commenced operations @ 06:00 hrs. 12/26/80. RIH w/8%" bit and polished off KEP to 9169'. Cir. & cond. mud. POOH. RIH w/8%" bit & Dyna-Drill. Oriented D.D. 130© rt of H.S. 2/SDC steering tool. Dyna-Drilled 8%" hole F/9169' to 9202'. Trip for bit Oriented Dyna-Drill 130© rt of H.S. w/SDC. Dyna-Drilled F/ (54') F/9202' to 9250'. Ran survey: 9235' 15© S-56-W. Shut down to replace crown (fast line sheeve was locked-up). POOH 2/Dyna-Drill. RIH w/Bit #4 on follow-up BHA #4. , '(54') 35 12/30/80 9362'/76' 13 3/8" C. 9 5/8" 9164 ' to RIH to 9150'. Circ. Reamed and washed from 9169' to 9250' 4 12' Directionally drilled 8%" hole F/9250' to 9347' Repaired F/ rotary chain. Drilled F/9347' to 9351'. POOH. RIH w/Bit (54') #5 on BHA #5 (locked up assembly). Reamed F/9321' to 9351' Directionally drilled 8%" hole F/9351' to 9362'. 36 37 38 12/31/80 9492'/166' 13 3/8" C. 4( 12' 9 5/8" F/ 9164' to ' (54') Directionally drilled 8%" hole f/9326' to 9334'. Replaced rotary chain. Directionally drilled 8%" hole f/9334' to 9492'. Pooh. 1/1/81 1/2/81 T.O.F. 9662' 13 3/8" C.: 4( 12' 9 5/8" f/ 9164' to 921~ ' (54') T.O.F. 964.1' 13 3/8" C. 41 12' 9 5/8" f/ RIH w/bit #6 on BHK #5. Reamed f/9462' to 9492'. Directionall, drilled 8%" hole f/9492' to 9662. (Had drlg. break f/9657 to 9662'). Tried to P.U. - could not. Worked stuck d.p. Changed fast line on crown. Spot lubri-sal-dieSel pill around d.p. Removed goose neck on swivel and RIH w/FPI & CCL on W.L. D.P. was free to crows foot @9640. Pooh w/W.L. Worked 9164' to 9211 ' (54') stuck d.p. D.O.T. jars would not hit consistently. RIH w/ string shot on W.L. Attemped a backoff @ 9640' - did not back'off. Pooh w/W.L. - had a misfire. RIH w/string shot .& backed off @ 9641'. Pooh 2/d.p. (fish - bit, roller reamer, 10' lead collar, roller reamer). 39 1/3/81 T.O.F. 9641' RIH w/fishing tools (screw-in sub, bumper jars. oil jars 6 - 13 3/8" C. 4 12' 6%" C.C.'s Acc. jars, 21 - HWDP). Tagged fill @ 9606'. 9 5/8" f/ Washed f/9606 to top of fish @ 9641'. Circ. Screwed into 9164' to 921 '(54') fish @ 9641'. Jarred on fish. S ET PAGE U,'IIC, OIL CALIFCP 'IIA ~" ~t~ I,ELL · LS SE .U.ni, on-Mo~ile StAte I'£LL IlO, FIELD Granite Point 2~TE 40 1/4/81 41 115181 42 1/6/81 43 1/7/81 44 1/8/81 1/9/81 T. O.F. 9641 13 3/8-c. 9 5/8" Wind 9164' to 9~ 9641' ' T.O.F. 13 3/8" C. ~ 9 5/8" Windc 9164' to 9: T.O.F. 9638 13 3/8" C. 9 5/8" Wind 9164' to 9~ ETD 9169' (cn 13 3/8" C.4( 9 5/8" Wind¢ 9164' to 9~ 9209'/40' 13 3/8" c. , 9 5/8" Wind, 9164' to 9~' 9256' 13 3/8" C., 9.5/8" Wind, 9164' to 9~ DET,\~;~_o e OF OPEP~qTICNS, DESCRIPTIC~IS g RESULTS Spotted 37 bbls. of black magic - SFT pill w/10 bbls. outside and 27 bbls. inside. Jarred on stuck fish. Continued to .012' jar on stuck fish. RIH w/string shot on W.L. while putting iw f/ L.H. torque int° d.p., the pipe unscrewed. Pooh w/W.L. !18'(54') Pooh w/fishing tools. Pipe unscrewed @ screw-in sub. RIH w/waShover assembly (8 1/8" OD diamond shoe, 17.97' of 8 1/8" extension w/screw-in sub at the base, safety joint, boot basket, bumper Ja~s., oil jars 6 - D.C.'s, Acc. jars, 21 - HWDP) to 9504'. Washed and reamed to toP of fish @ 9641'. , · Worked over top of fish @ 9641' w/diamond shoe #1 on BHA #7. Milled on reamer body fOr 6 hours -.made 6". Pooh. Lost 012' diamond insert out of rotary shoe RIH w/shoe #2 on BHA #7. .w f/ Milled on reamer body for 2 hours '- no progress. Pooh.. Laid 18'(54') down washpipe and tools. RIH w/BHA #8 (screw-in sub, Johnson jars, 12- u~=L" DC's, XO, pump out sub, and 21 - HWDP) .to jar on fish. Screwed into fish at 9640'. Jarred on fish for 11 hours - would not pull free. RIH w/Dialog string shot on CCL to ~012' 9641' and attempted a back-off -it was unsuccessful. Re- ~w f/ dressed string shot and RIH. Backed off pipe on toP of ~18'(54') screw-in sub at 9638'. Pooh w/fishing tools. P.U. and RIH w/25 its (774') of 3½" butt. tbg. on 5" d.p. Tagged top of fish at 9638'. Circ. and cond. mud. Circ. and cond. mud @ 9638'. R.U.B.J. and equalized in ~t) 300 sx. of Cl. "G" cmt. w/.3% R-5 and 10% sd. followed by 4 bbls. of H20 and 151 bbls. of mud. CIP @ 01:30 hrs. 1/7/81. 112' Pulled up to 8550' and reversed clean. Pooh and laid down ~w f/ all "G" d.p., and 73 jts. of "E". d.p, RIH w/8%" bit - on i18'(54') BHA #i0 (picked up 103 jts. of X-95 d.p. on top of string) and tagged top.of cmt. @ 9052'. Cleaned out soft cmt. to 907~ WOC 4 more hours (total of 18 hrs.). Drilled firm cmt; f/9075' to 9169'. Circ. and cond. mud. Pooh. ~ Finished Pooh. RIH w/bit #7 on BHA #11 for Dyna-drill' run #3. RIH w/steering tool - packoff failed. Pooh and repaired ~012' packoff. RIH w/steering tool'and oriented.Dyna-drill 170° ,w f/ rt. of high side . Directionally drilled 8½" hole f/9169' to 118'(54') 9209'. Pooh. R~H w/bit #8 on BHA #12 for Dyna-drill run #4. · · Repaired air line on #1 engine. Finished RIH w/BHA #12 for .Dyna-drill run #4. RIH w/steering tool. Oriented D/D. 130° 012' rt. of high side. Directionally drilled~8½'' hole f/9209' to w ~/ 9213'. 'Steering tool failed. Pooh. Repaired tools and 18'(54') W.L. RIH w/steering tool and directionally drilled 8½" hole f/9213' to 9241'. Steering tool failed again. Pooh w/ W.L. Pooh w/d.p.. RIH w/bit #9 on BHA #13. (follow-up assembly). Reamed f/9167' to 9241'. Dir~ctionally drille~ 8½" hole f/9241' to 9256'. UHIC!I OIL G CALIFC 'IIA I ~l..k.,kj ~ ',13 ~;NSE Union-Mobile state Il0, 33- 4 RD FIELD Granite Point 5%TE 46 1110181 47 1/11/81 48 1/12/81 49 1/13/81 50 1/14/81 51 1/15/81 52 1/16/81 53 1/17/81 54 1/18/81 9396' 13 3/8" C. ' 9 5/8" Wind~ 9164' to 9: 9600' 13 3/8" C. 9 5/8" Wind 9164' to 91 9684 '/84 ' 13 3/8" C. 9 5/8" Wind 9164' to 91 9 5/8" 9164 9877'/193' 13 3/8" C. z 9 5/8" Wind~ 10041'/164' 13 3/8" C. 9 5/8" Wind 9164' to 9~ 10130'/89' 13 3/8" C. z 9 5/8" Wind~ 9164' to 10136'/6' 13 3/8" C. 4 9 5/8" Windc 9164' to 92 10388'/252' 13 3/8" C.4( 9 5/8" Wind¢ 9164' to 92 10338' TD' 10288' T.O.F 13 3/8"C. 40 9 5/8" Windo 9164' to 92 DETAILS OF .OPEP~qTIONS, DESCRIPTIO~IS ~ RESULTS Continued to drill f/9256' to 9312'. Dropped suryey and Pooh. (Survey: 9281' 13° S-72-W). RIH w/bit #10 on BHA ~012' #14 (locked-up assembly). Reamed f/9281' .to 9312'. Direct- ,w f/ ionally drilled 8½" hole f/9312' -to 9376' . (Had drlg. break 118'(54') f/9373'" to 9376'). Had high P.U. wt. and high torque. Reamed hole. Continued to drill 8½" hole f/9376' to 9396' - while raising mud wt. to 73 PCF. · Directionally drilled-'8½" hole f/9376' to 9422'. Made short trip. Directionally drilled 8½" hole f/9422' to 9514'. .012' Had high torque (600 unitS) and P.U. wt. (360M#). Reamed )w f/ & worked pipe @ 9514'. Directionally drilled 8½" hole ~18'(54') .f/9514' to 9529'. Mad short trip - OK. Directionally drilled 8½" hole f/9529' to 9600'. Directionally drilled 8½" hole f/9600' to 9638'. Made .012' wiper trip. Raised MW to 75 PgF. Tight'spot on trip @ ,w f/ + 9490'. Directionally drilled 8½" hole f/9638' to 9674'. 118'(54') Trip for bit #11. RIH w/bit #11 on BHA #15. Directionally' drilled 8½" hole f/9674' to 9684'. Directionally drilled 8½" hole f/9684' to 9877'. 012' w f/9164' to 9218'(54') Directionally drilled 8½" hole f/9877' to 9973'. Made wiper 012' trip to shoe. Had tight spot @ 9730' to 9740', 350M# max ,w f/ . pull & it cleaned up well with a couple of passes thru the 18'(54') interval. RIH. Directionally drilled 8½" hole f/9973' to 9993'. Stripped btm. 7' of'Kelly. Pulled into csg. & repaired Kelly drive bushing (will replace Kelly next trip). RIH. Directionaily drilled 8½" hole f/9993' to 10041'. Directionally ~riiled 8½" hole f/10041' to 10109'. Pooh. 012' (tight spot f/9985' to 9995'). Changed Kelly. RIH wJbit w f/ #12 on BHA #16. Directionally drilled 8½" hole f/lO109' to ;218' (54') 10130'. )12 '~ f/ ].8' (54') Directionally dril'led 8½" hole f/lO,130' to 10,136'. Kelly was slipping in b~shings. Pulled to shoe. Repair bushings. RIH & directionally drilled 8½" hole f/10,136' to 10,264'. · . Continued to drill 8½" ho~e f/10 264' to 10,271' Made wiper , ; 12' trip. Had tight spots @ 10,225', 9850', and 9789'. RIH &. ~ f/ directionally drilled 8½" hole f/10,271' to 10,325' (Drlg.. 18'°(54') break @.10,295'). Kelly still 'slipping. Pulled to shoe & repaired bushings. Had tight spots @ 10,228', 9855',' & 9789'. RIH & directionally drilled 8½" hole f/10,325' to 10,338'. Driller made 3' & air line to rotary table broke. Drill pipe was stuck w/bit on bottom @ 10,338'. Worked stuck d.p. jars hitting @ 380-395M#. RIH w/FPI - showed pipe free to top of monel D.C. @ 10,288'. .2' Pooh w/W.L, unstranded. Waited on boat to change out W.L. ~ f/ unit. Mixed and spotted 30 bbls. of IMCO spot - diesel fluid 18'(54') w/20 bbls..outside pipe. Worked stuck d.p. RIH w/FPI on new W.L. unit - backed off drill string @ top of mon&l D.C. @ 10,288'. (Left 50.04''of fish in hole). Pooh. Laid down jars and stabs. PAGE 8 U 'IICI OIL CF CALIFCPCIIA ,ELL LE SE Union-Mobile State #1 I' SLL IlO, FIELD Granite Point D~TE ElD DET,\'I,_4 ~ OF.DPEP~TICNS, DESCRIPTIO~IS ~ RESULTS · . 55 1/19/81 56 1/20/81 57 1/21/81 58 1/22/81 59 1/23/81 60/ 1/24/81 61 1/25/81 10,338'/0' T. 0. F. 10,2~ 13 3/8" C. ~ 9 5/8" Wind, 9164' to 91 10,338'/0' T.O.F. 1028~ 13 3/8" C. 9 5/8" Wind 9164' to 9; 10,338'/0' T.O.F."iO~2( 13 3/8" C. 4 9 5/8" Windo 9164' to 92 10,338'/0' T.O.F. 1030( 13 3/8" C. 4 9 5/8" Windc 9164'to 92 10,338'/0' T.O.F. 1030( 13 3/8" C. 9 5/8" Wind 9164' to 9i 10,338'/0' T.O.F. 10,21 13 3/8" C. ~ 9 5/8" Wind( 9164' t° 9; 1~,338'/0' T.O.F. 10,2 13 3/8" C. z 9 5/8" Wind( 9164' to 9~ RIH w/BHA #17 (diamond.shoe, 52.44' of wash pipe, safety j~., 36' jars, 3 DC's, HWDP). Tagged fill @ 10,222' (66' above ~012' top of fish). C.O. fill. Tagged top of fish @ 10,286' (2' )w f/ high). Worked over fish and cleaned out to stab. blades ~18'(54') @ 10,3i6'.. Kelly was hanging up. Pulled up to 9 5/8" csg. shoe and changed out Kelly and Kelly bushings. completed changing out Kelly and Kelly bushings. RIH ' and worked over top of fish. Reamed f/10,306' to 10,316'. .012' Milled_+ 12" on top stab. when rotarY shoe quit. Pooh & ,w f/ changed shoes. RIH & completed washing over top stab. and 118'(54') worked down to 10,319'. Rotary table failed. Pooh. Drawworks failed w/6 2/3 stands of pipe pulled. Repaired drawworks. Pooh w/W,O, assembly. Replaced rotary tables (12 hrs.). " RIH w/W.O, assembly and worked over'top of fish @ 10,286'. ~12' Washed down f/10,319' to 10,320'. and lost rotary table f/ (drive sprocket spun, on hub). Pulled up to 9 5/8" csg. 18'(54') shoe. Hole was tight f/10,06g' to 9975'. COmpleted repairs on rotary drive sprocket. RIH & worked ' over top of fish. Reamed f/10,300' to 10,320'. Washed )12' down f/10,320' to 10,331' (top of stab. bla~es). Rotary f/ torque indicator quit. Pulled up to 9 5/8" shoe - could 18'(54') not make indicator work. RIH & rotated thru bridge @ 10,270'. Worked over fish and rotated down f/10,300' to 10,331'. Cut over 2nd stab. f/10,331' to 10,3.34'. Drill string began to torque up. Pooh w/W.O, assembly. Finished Pooh w/W.O, assembly. Left diamond-shoe & .3' of ~ mill control extension in hole (2.47' O.A.). RIH w/screw-in .012' assembly & latched onto fish @ 10,286'. Jarred on fish for ,w f/ 4½ hrs - would not pull free. RIH w/Dialog string shat for 118'(54') backoff. Fishing tools backed off w/o shooting string shot. Pooh. Rec. all fishing tools. RIH w/BHA #19 - washover assembly.(Diamond shoe, wash pipe extension w/ screw-in sub, safetY jr., & circ. it., jars, 9 - DC's, acc., Washed over fish to 10,330' & engauged fish w/screw-in ;6' sub. @ 10,286'. Jarred on fish for 2 hrs. (released j-slot ~012' safety jt. to work wash pipe every 15 min.). 'Released from ~w f/ fish & Pooh. RIH w/BHA #20 (washover assemblY) - could not ~18'(54') get over fish. Pooh. RIH w/BHA #21 (overshot). Attempted to work over fish - could not. Pooh. (cut-lip 6' guide indicates junk on top of fish). RIH w/25 jts. of ~012' tubing on 5" d.p. to 10,275'. Circ. & cemented w/125 sx. ,w f/ cl. "G" w/10% sand & .3% R-5 followed by f69 bbls. of mud. 118'(54') CIP @ 16:12 hrs. 1/25/81. Pooh w/tbg~ tail. WOC. S Er.,q' D PAGE UHIC'!I OIL CCf"PP- ',7 CF CALIFCP IIA I,ELL i?rn'- n Union-Mobile State #1 FIELD Granite Point D~TE ETD DETAILS OF-QPEP, ATICNS, DESCRIPT['.C, ilS ~, RESULTS 62 1/26/E 63 1/27/8 64 1/28/8~ 65 1/29/81 66 1/30/81 67 1/31/81 68 2/1/81 1 10,338'/0 T.0. C. 13 3/8" C. 9 5/8" Win to 9218 ' 10,338'/0' T.O.C. 101 9 5/8" Win 9164' to 9 10,338'/0' T.O.C. 1012 9 5/8" Wind to 9218'(~ 10,338'/0' T.O.C. 1013 9 5~8" Wind 9164' to 9 10179'/57' T.O.C. 1013 9 5/8" Wind, 9164' to 921 10215'/36' T.O.C. 1013 9 5/8" Wind, 9164' to 921 10253'/38' T.O'C. 1013 9 5/8" Wind~ 9164' to 92] RIH w/bit #13 on BHA #22. Tagged cmt. @ 10078'. Polished off hard cmt. to 10130'. Circ. clean & Pooh. R~paired 30' drawworks brakes. 4012' ~ow f/9164' ' (54') Repaired Hydromatic. RIH w/bit #14 on BHA #23 for Dyna- · Drill run #5.- Couldn'"t work thru bridge @ 9775'. Pooh. 30" RIH w/bit #13RR #1. Reamed tight spot f/9625' to 9713'. ~ow f/ Piped torque stalled @ 9713' & had to jar loose f/9713' 218'(54') twice. Pulled into 9 5/8" csg. '& raised MW to 78 PCF. RIH & reamed f/9625' to 9729'. Couldn't work below 9729' due to running coal. Recovering large amounts of coal over the shakers. 0i' ow f/ 4') Raised MW to 80 PCF. RIH & reamed f/9713' to 10130' (11 hrs.). Bad spots'f/9727' to 9729', 9956' to 9970', 9997' to lO000",.& f/10090' to 10130'. Circ. clean 4 hrs. Set Kelly back to Pooh & pipe stuck. Pulled 350M#'& hit jars - still stuck. Picked up Kelly & broke circ. & pipe came free. Pumped 1st 10 its. out of' hole to 9700'. Set Kelly back & pulled to shoe. (Note: 'coal section @ + 9700' is prob. interval). Circ. btms up & rec. large amounts.of coal over shakers. Pooh. RIH w/bit #15 on BHA #24. Built MW to 85 PCF @ shoe. RIH to 9665' & circ. Set Kelly back & couldn't work below ' 9625'. Picked up Kelly & reamed'f/9625' to 10130'.. Circ. ~w f/ clean. ' Pulled to shoe - Had tight spots @ 9940' & 9594'. ~18'(54') RIH - reamed spot @ 9940', didn't see spot @.9594', had bridge @ 10122'. Circ. btms. up. Short trip to shoe. Tight SPOTS @ 9466' & 0294', and 2' fill on btm. Circ. clean - Pooh. RIH w/ w f/ BHA #25 & bit #16, for Dyna-Drill Run #5. Oriented Dyna- .8'(54') Drill 80° left on H.S. w/SDC steering tool. Dyna-Drilled 8½" hole f/lO122'.to 10138'. Dyna-Drilled f/10i38' to 10187'. Rigged down SDC & Pooh. O' RIH w/bit #17 on BHA #26. Hit bridge @ 9952'. Reamed f/ ,w f/ 9952' to 10157'. Hole sticky @ 10157'.& couldn't make .8'(54') progress reaming. Raised MW to 87 PCF. Reamed f/10157' 10187'. Directionally drilled 8½" hole f/10187' to 10215 · . Directionally drilled f/10215' to 10253'. Pooh. Tight ' spots o~ trip out @ 10075' 9294' 9267' & 9242' RIH w/ , , · ~ f/ BHA #27 & bit #18. Hit bridge on trip in @ 9239'. Reamed .8'(54') f/9239' to 9745'. 10 'D UHIO!I OIL CO ', i,q' CF CALIFCSIIA I,ELL Union-Mobile State #1 33-14 RD FIED Granite Point 5~TE ETD I DETAILS OF.DPEP~ITIONS, DESCRIPTIO~IS g RESULTS ' 69 2/2/81 70 2/3/81 71 2/4/81 72 2/5/81 73 2/6/81 74 2/7/81 75 2/8181 / 10311'/58' / ' 13 318" c. Zl. o12' 9 5/8" WindSw f/ 9164' to 9~ 10412'/101' 13 3/8" C. 4 9 5/8"'Windo' 9164' to 92. 10505'/93' 13 3/8" C. 4 9 5/8" Windo, 9164' to 92. .10505' TD 10416' ETD ( 9 5/8" C. 91 · 7" Liner f/8 to 10505' 10505' TD 10416' ETD (I 9 5/8" C. 916 7" Liner f/8~ to 10505' · 10505' TD 10467' ETD (C 9 5/8" C. 916 7" Liner f/89 to 10505' 10509'/4' 9 5/8" C. 91( 7" Liner f'/89 to. 10505' Continued reaming f/9745' to 10253'. (16% hrs. total time reaming in on this trip in). Directionally drilled 8½" hole f/10253' to 10311'. Circ. clean. Spot 80 bbl. pill' 18'(54') of holemud w/2 PPB Soltex & 1/2 PPB Drispac in btm. Pooh. Had one-tight spot on trip our @ 9901' - Pulled 40M# over P.U. wt. RIH w/bit #18 on BHA #27. (NOTE: Corrected - bit numbers). ,, Continued running in hole with BHA #27 and bit #18. Reamed )12' 70' to btm. f/1024].' to 10311'. Trip in to 10241' was slick. ; f/ Directionally drilled 8½" hole f/10311' to 10412'. .8'(54') Directionally drilled 8½" hole f/10311' to 10412'. Directionally drilled 8½" hole f/10412' to 10505'. Trip to )12' shoe Hole tight @ 10054' 9958' 9985' 9762' to 9817' & z8f/.( .-9443'.) RIH. 4' fill on btm. tight@ 98 2'. Circ. clean · 54' Spot 80 bbls. hole mud w/an additional 2 PPB Soltex & 1/2 PPB Drispac on btm. .C.) 4' ~12' Pooh.. Had tight-spots on trip out @ 9950', 9684" & 9418' to 9388' max pull 280M# (260M# P.U.'Wt.). Ran 7" 29# P-110 Buttress Liner on BtO.T. hanger. -(Gauged liner to 6 1/8"). Circ. cap. of liner & D.P. dropped ball & set hanger~ Hung liner w/F.S. @ 10505', FC @ 10458', P.C.o @ 10416'.. & top of tie back sleeve @ 8712'. Released f/hanger. Cmt'd 7" liner w/400 sxs. Cl. "G" w/1.5% D-19, .5% D-31, 3% KCL, .2% D-6 & 20% Silica Flour. Mixed to an avg% ~lurry wt. of 118 PCF w/PSB. Pumped 200 CF water ahead of cmt. & displaced with mud. Bumped plug w/2500 psi. C.I.P. @ 20:15 hrs. .C.~ 4' 12' Cleaned.out top of liner @ 8912' w/8½" bit. No' cmt. on top of liner. Closed rams &-tested liner lap. Lap broke down @ 3000 psi. Pu~ped into lap w/llCFM @ 2600 psi. Lap held 2000 psi & stabilized with pumps off - i.e. 121 PCF equiv. @ 9164'. Will squeeze lap when completing Well· Pooh.- Broke fast line shieve in traveling blocks. Unstrung blocks from Monopod. Replaced crown & traveling blocks. mt. ) 4' 12' Layed dow~ 5" X-95 .pipe. Picked up 3½" S-135 pipe· RIH. Drilled out plug c~tcher @ 10416' hard cmt to 10467' ~ · , · · Drilled out hard cmt. from 10467, to 10458', float collar @' 10458', hard cmt. to 10505', & float shoe @ 10505'. Drilled to 10508'. Circ. & cond. mud,-lowered wt. to 74 PCF. ~odh. 'Rigged up'Dresser Atlas & ran CBL-VDL-SIG w/GR & CNL w/GR logs. RIH w/BHA #30 & bit #20. Directionally drilled 6 1/8" hole f/10508' to 10509'. ISE Union-Mobile State #1 '0 ' UNIC.'!I OIL CI3 CF CALIFC 'IIA i,ELL . ¥~LL [I0, 33-14 'RD FIELD Granite Point 5~TE 76 77 78 79 8o 81 82 83 84 2/9/81 2110181 2/11/81 2/12181 2113181 2114181 2/15/81 2/16/81 211718]. 10652 '/143 ' 9 5/8" C. 9 7" Liner'f/ 10505 ' 10735'/83' 9 5/8" C., 9, 7" Liner f/~ 10505' 10822'/87' 9 5/8" C. 91 7" Liner f/; 10505' 1094.0'/118' 9 5/8" C. 92 7" Liner ~/~ to 10505' 11098'Z158' 9 5/8" C. 9: 7" Liner f/~ 10505' 11210'/ii2' 9 5/8" C. 9] 7" Line'r f/~ 10505 ' 11325'/115~. 9 5/8" C. 9] 7" Liner f/~ 10505' 11370'/45' 9 5/8" C. 9] 7" Liner f/8 10505' 11410'/40' 9 5/8" C. 9~ 7" Liner .f/ 10505 ' DETAILS OF.DPEP¢ITICNS, DESCRIPTIO~IS g RESULTS 164 ' ]912 ' to 'Directionally'drilled 6 1/8" hole f/10509' to 10652'. - Pooh. RIH w/bit #21 bn BHA #30. Directionally drilled .64' 6 1/8" hole f/10652' to'10735'. 912' to ..... · Directionally drilled 6 1/8" hole f/10735' to 10789'. 64' Spot 25 bbl. pill w/6PPB Soltex on btm. Pooh. RIH 3912' to w/bit #22 on BHA #30. Directionally drilled 6 1/8" hole f/10789' to 10822'. 64' 1912' Directionally drilled 6 1/8" h°le f/10822' to 10940'. Spot 25 bbl.'pill w/6 PPB Soltex on btm. Pooh. 64' ;912 ' to RIH w/bit #23 on BHA #30. Directionally drilled 6 1/8" hole f/10940' to 11098'. Directionally drilled 6 1/8" hole f/11098' to 11210'. 64' Spot 25 bbl. pill w/6 PPB Soltex on btm. Pooh. Had tight ;912'-to spOts on trip out @ 10901', 10812' & 10777'. Hole cond. good on trip in. ...Directionally drilled 6 1/8" hole f/l1210' to 11325', w/bit 64' #24 on BMR #30. ;912' to Directionally drilled 6 1/8" hole' f/11325' to 11368'. Spot 54' Soltex pill-on btm. Pooh. Hole tight @ 10900', 10812' & )12' to 10777', 2OM# max over P.U. wt. Repaired rot. torque wheel.. RIH w/bit #25 on BHA #30. Reamed thru bridges f/10742' to 10770', 10990' to'~11053' & 11216' to 11231' Washed to btm. f/11298' to 11368'. Directionally drilled g'-'l/8" f/11368' to 11370'. · . Directionally drilled 6 i/8" hole f/11370' tO 11410'. 54' Sweep hole w/viscous pill. Spot Soltexpil! on btm. .912' to Pull to shoe. Hole tight @ 11212', 10995' & 10837', 20M# max ovem P.U. wt. Wait 3½ hrs.' RIH. One slight tight spot @ 10899' on way in. Had 8' fill on"btm. Circ. clean. Spot 100 bbl. pill of 6PPB Soltex w/Drispac on btm. 12 OIL COF-? .iIY CF CALIFC, 'IIA ,ELL i',ECC,?J3 L~;~F~ union=Mobile state #1 D~TE ETD IIO, aa- 4 FIELD Granite Point 85 2/±8/8] 86 2/19/81 87 2/20/81 88 2/21/81 89 2/22/81 90 2/23/81 91 2124/81 11410' TD 9 5/8" C. S 7" Liner f/! to . 10505 ' 11410' T.D. 9 5/8" C. 9 7" Liner f/ to 10505 ' 11410' T.D. 13318' C. 4, 9 5/8" C. 91 7" 8912'-10, 5" 10468 '-1 11399 ' ETD 11346 ' ETD 13 3/8" C. 9 5/8" C. 9 7" 8912'-10 5". 10468 "-1 11410' TD 11 9 5/8" c. 9f, 7" Liner f/8 to 10505' 5" Liner f/l~ to 11410' F.I.W. 11410' TD 11400' ETD (~ 9 5/8" ¢. 91( 7" Liner f/ i to 10505' 5" Liner f/l( to 11410' F.I.W. 11410' TD 9958' ETD (R~ 9 5/8" C. 916 7" Liner f/SS to .10505! 5" Liner f/lC to 11410' F.I.W. 104' 8912' L64' 8912' )12' .64' 505' L410' cmt. ) .012 ' ' ;05 ' 410 ' 399 ETD 54' ~12' ]468' mt. ) ~4' ;912' 468' 4' 12' ~68' DET,\'I,_~e OF .OPEP~TICNS, DESCRIPTI'O~IS ~ RESULTS 'Pooh.for logs. RU Schlumberger and RIH w/logs. .Log stopped @ 10686' WLM (base of coal above B-2 sd.). Ran DLL/SP f/10686' to shoe @ 10505'. Pooh and rigged down Schlumberger. RIH w/BHA #30 to 10385'. Built mud wt. to 80 PCF. RIH - toOls stopped @ 10728'. Reamed bridge f/ 10728' to 10738'. Remainder of hole was smooth. Washed and reamed f/11358' to.Ii410', Had.13' of fill on bottom. Built mud wt,...to 82 PCF. Circ'. w/82 PCF mud. Made.:short trip to shoe of 7" csg. Had tight.spots @.11,351', 11237' & '10,957~. Wait 2 hrs. & RIH to~ll,410'. Circ & spot 6#/bbl. Soltex pill. Pooh. Had tight spots'@ 11,210', 10,8.63' & 10,769' Pooh. Rigged up to run 5" liner. Ran'5'' 18# N-80 buttress liner on B.O,T. hydraulic hanger, hung liner with float shoe @ 11410'. Float collar @ 11366' plug catcher @ 11323', landing collar @~11282' & top of tie back sleeve @ 10468'. Circ cap. of D.P. & liner. Cemented 5" liner with 200 sxs.' .CL. "G" w/ 1.5% D-19, .75% D-31, .1% D-6, 3% KCL & lO%.silica fluor. Bumped plug w/ 2500 psi. C.I.P. @ 07:20 hrs 2/20/81. POOH. RIH w/ 6 1/8" ~bit & 7" csg. scrpr. Tagged cmt. @ 10367'. C.O. cmt f/10367~ to top of 5" liner @ 10468'. X-over to FIW. POOH, RIH w/ 4 1/8" Servco econo-mill. C.O. cmt. stringers in top of 5" liner. RIH. Tagged hard cmt. @ 11275'. C.O. hard cmt f/ 11-275' to 11282'. Drilled out landing collar @ 11282'. C.O. hard cmt. f/11282' to 11323', drilled out plug catcher @ 11323'. C.O. hard-cmt, f/11323' to 11346'. POOH (4 1/8" m-ill #1 71' in 9 1/2 hrs). RIH w/ new mill. C.O. hard cmt..f/ 11346' to 11366'. POOH (4 1/8" mill #2 21' 5 1/2 hrs). RIH w/ new mill. C.O. hard cmt. f/ 11366' to 11399'. Cleaned out cmt. in 5" liner f/ 11399' to 11'~00'. Circ clean w/ viscous pill. POOH. Rigged up Dresser Atlas. Ran CBL-VDL-SIG-GR & 'CNL-.GR logs. Ran SDC gyro survey f/ surface to 11406' ETD. Perf'd 4 HPF. f/10042' to 10044' for isolation sqz at bake of "A" zone. RIH & set 7" RTTS @ 9800'. Broke down ~qz perf's f/10042' to 10044' w/ 6000 psi. Released tool & POOH. RIH & set Howco cmt. ret. @ 9958'. Sqz'd perf's f/10042' to 10044' w/ 100 sxs CL "G" w/ 1.5% D-19, .5% D-31, .1% D-6, 3% KCL & 10% silica flour. Initial rate 6 CFM @ 6200 psi, final rate 4 CFM @ 6500 psi. C.I.P.-@ 5:42 p.m. POOH. ' U['IIOi OIL CC('?A IY OF CALIFORIiIA ELL RECORD S}: T D PAGE ih. 13 LEASE 'Union-Mobile State #1 'ELL h'0, FIELD Granite Point 92 93 94 95 96 97 DATE 2/25/80 2/26/81 2/27/81 2/28/81 ETD 11,410' TD 9155' ETD (cmt~et.) 9 5/8" C.'.9164' 7" Liner f/8912' to ', 10,505' 5" Liner f/10,468' to 11,410' FIW DEYAILS__OF OPEP, ATiO[tS, DES,CRIPTIOI!S & }qESUL,TS -. .RIH & set 9 5Z8' RTTS @'8745'. Couldn't pressure up on back side. Pumped into annulus @ 22CFM @ 1400 psi. Pulled out searching for hole. Located bad section of pipe f/4003' to 4121'. Pipe tested to 2500 psi below 4150' to 9251'. -~rH & set cmt. ret-.. @ 9155'. Rigged up Go, Int. & RIH w/2' perf gun, checked collars & perf. f/9250' to 9252' - 2 HPF. Broke circ, through perfs - 3 BPM @ 700 psi. Cmt'd 9 578" x 7" lap w/100 sxs CL "G" w/1.5% D-19, .75%.'D-31, .2% D-6, 3% KCL & 10% silica flour, taking returns up annulus POOH. · · '11,410' TD . RIH & set 9 5/8" RTTS @ 3818'. Sqz'd holes in 9155' ETD (cmt.ret.) " 9 5/8" csg. f/4003, to. 4121' w/400 sxs CL "G" cmt. : 9 5/8" C. 9164-' : w/10% sand & .2% D-6. Initial rate 4 BPM @ 1200 · 7" Liner f/8115' : psi, final rate i BPM @ 1650 psi, Held pressure on 10.,505`.' .; sqz'd for 5 hrs. Released tool & POOH. 'WOC 12 hrs. 5" Liner f/10,468' ~ RIH w/8½" bit. Tagged top of cmt. @ 3939'. Cleaned to 11,410" FIW · ! out hard cmt f/3939' to 4120' & stringers to 4190'. RIH to top of liner @ 8912'. No cmt on top of lap. . ~ .Circ. clean. Same as above ~ Completed. POOH. RIH w/6 1/8" bit. Cleaned out cmt 2 f/907.8' to 9155'. Drilled on ret. @ 9155' 4 1/2hrs. EXCEPT: , POOH. RIH w/6 junk mill. Drilled out ret. @ 9155' 11,400' ETD (cmt.ret.)' Cleaned out cmt f/9155' to 9245' RIH to ret. @ 9958' Same as above 'i Drilled out ret. @ 9958'. Tagged cmt. under ret. @ 10,017' Cleaned out cmt f/10,'017' to 10,040' RIH to top of 5" liner. POOH. RIH & set 9 5/8" · . ' RTTS @ 8797'. Pressure tested 7" '& 5" laps to 4000 psi.: Pressure tested 9 5/8" csg above 8797' to 1300 psi. POOH. RIH w/60 int. 2 5/8" carrier. Couldn't get into 5" liner, POOH w/.WL, RIH w/4 1/8" mill. 3/1/81 ' Same as above Same as above 3/2/81 Cleaned out junk on top of liner @ 10,468'. .RIH to 11,400' ETD. POOH. Had drag coming out & had to pump out to top of 5" liner. Ran back to btm @ 11,400'. Circ high vis pill. POOH. PerfOrated the "C" zone'.f/ll,246' to 11,230', 11,194' to 11,104' & f/tl,074' to 11,044' w/4 HPF using GO Int.. 2 5/8" cased carriers. Perforated the "B" zone f/10,756' to 11,716' & f/10,585' to 10,490' w/4 HPF using Go tnt. 2 5/8" cased carriers. Perforated the "B" zone f/10,455' to and the 10;'~90' ~"A" zone f/10,044' to 10,000' w/4 HPF using Go Int. 4" carriers. Ran 7" scrpr to 10,46~' & 5" scrpr to 11,360' (1 trip). Circ clean. Had some fOrmation gas circ to surface. POOH.. RIH & set Baker 5" Model "D" packer on DP @ 10,830'. PAGE" ' ~'~D, 14 UiiIO, I OIL CC -, OF CALIFO, 'IIA ,ELL I',ECO?JD LS SE Union-Mobile State #1 ~';~ IlO, 33-14 RD FIELD Granite Point 5%TE ! ETD 98 3/3/8: 99 3/4/81 100 3/5/81 lO1 3/6/~)1 11410' TD 11400 ' ET! 9 5/8" C. 7" Liner 5" Liner FIW 1'1410' TD 11400' ETD 9 5/8" C. 7" Liner f/ 5" Liner f/ FIW 11410' TD 11400' ETD 9 5/8" CJ 7" Liner f 5" Liner f FIW ll410' TD 11400' ETD 9 5/8" C. 9 7" Liner f/E 5" Liner f/1 FIW DET,\'I,_~ ~ OF OPEP~ITIONS, DESCRIPTIO~IS & RESULTS (cmt.) )164' /8912' to 10505' /10468' 'to 11410! 'RIH & tested pkr @ 10380'. Established in- jection into "C" zone @ 171 BWPD (7 BBL/hr) @ 6500 psi~ Mixed & spotted 5000 gal 10% HCL in 3 stages. (Each stage 1000 gal 10% HCL fol- lowed by 500 gal 10% HCL w/ 1 1/2 #/gal benzoic acid flake diverter). Initial rate during dis- placement 7 bbls/hr, rate after displacing 1680 gal 3 1/2 bbl,/hr. Had sudden communication to · 'annulus after displacing 1680 gal (8 hrs into displacement). Pulled out of packer @ 10830' w/ seals. Circ clean. cmt. ) 64' ;912' to 10505' 0468' to 11410' POOH. Located wash-out' 2790' f/ surface in 5" 19 1/2 #G, 4" long split in slip area. RIH & retested pkr @ 10830' to 6500 psi w/ lO00 psi on back side. Circ well clean. POOH. RIH & set baker model "F" pkr @ 10200' w/ tubing tai~ Stabbed into pkr @ 10830' Had Washout in,.e drill pipe while setting [he pkr w/ 2000 psil Picked up 5OM# & completed setting pkr. POOH. Found washouts @ 2852' & 2883' in 5" 19~1/2# "E", washed out in slip awea. RIH & tested pkr @ 10200' w/ seals on drill pipe to lO00 psi. Displaced hole w/~ew FIW. !164' 8912' to 10505' 10468' to ll410' :mt. ) 64' 912' to 10505' 0468' to 11410' Completed .POOH. RIH w/ Baker Model "F" packer w/ comp assy under packer. Stabbed into perm pkr @ 10200' & set packer @ 9898'. POOH. RIH w/ s~eals on drill pipe. Tested pkr @ 9898'. POOH. Laying down drill pipe. NOW: Runnipg 3 1/2" ABC tubing. Hydro-tested to 7000 psi. , Completed running 3 1/2" 9,4# N-80 tubing w/ ABC couplings, hydro-testing to 7000 psi. Dis- placed annulus w/ packer fluid (nutro chemicals 'C-75 &.C-II0). Spaced out. and landed .tubing. Installed BPV, removed BOPE, installed .& tested x-mas tree. Released rig to deaCtiviation AFE #311901 @ 24:00 hrs 3/6/81. Completion Equipment: 3 1/2" XA Sleeve @ 9862' Baker Model "F" @ 9898' . Cameo Fl ow Regs @ 10014" & 10086': Baker Model "F" @ 10200' Camco Flow Regs @ 10309' & 10347' 3 1/2" to 2 3/8" X-over @ 10387' Baker Model'."FA-l" @ 10830' 1111 East 80th Anchorage, Alaska 99502 Phone 349-3541 Telex: .25-364 World Leader in Service to the Oil Industry March 15, 1981 Job #4416 North Slope Drilling' /~ Enclosed please find our GyroUSurvey on Granite Point 33-14RD along with our Vertical Section and Horizontal View maps. ~- ~o7¢~oI Also enclosed you will find the Gyro Film, Field Sheet and Calculations. If any other information is needed please call 349-3541. Thank you for using Scientific Drilling International and please call' again. Sincerely Manager · ,~C,V, PL~TION REPORT OIL sYqDSCOPIC- SURVEY CF CURVATURE METHOD OF CO'.'mUTED ,FOR SDC BY FM LINDS[Y coMPUTATION & ASSOC 25 FEB 81 WELL 33-1 4RD KB ELEV ~FT, JOB NO 4416 RECORD OF SURVEY TRUE ',~EAS. DRIFT VERTICAL SUB DEPTH ANGLE DEPTH SEA D ~ 0 0 0 0,00 -94,00 100 0 0 100,00 6,00 200 0 0 200,00 lu6,00 300 2 0 299.97 205,9? 400 3 15 399.87 305.87 500 4 30 499,64 405,64 600 5 0 599,29 505,29 700 4 45 698,93 604,93 8'C0 4 0 798,64 704,64 900 3 45 898,41 804,41 !300 4 0 998,18 904,18 !100 3 0 1097,99 1003.99 1200 3 0 1197,86 1103,86 1300 3 0 1297.72 1203.72 laO0 3 0 1397,58 1303,58 1500 3 30 1497,42 1403,42 IgO0 4 0 1597.21 1503.21 1700 5 0 1696,90 16G2,90 1900 5 30 1796.48 1702.48 1990 7 0 1895,89 1801,88 2090 8 30 1994,96 1900.96 21C0 11 0 2093.51 1999.51 2200 1~ 30 2191,23 2097.23 23:70 16 0 22R7,92 2193,92 2409 17 0 23B3,81 22B9,81 N N N S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S6 S6 S8 N8 N8 S7 DRIFT DIREC DEG. TOTAL COORDINATES O.OOE 0,00 S 0.00 W O.OOE 0.00 S 0.00 W O.OOE 0.00 S 0.00 W 1,OOW 0,60 N 1,26 W 6,00W 2,12 S 4,94 W 1,OOW 6,13 S 10,37 W 5,00W 11,12 S 16,98 W 5.00W 15,99 S 23,94 W 7,0OW 20,26 S 30,27 W 9,00W 23,84 S . 36,00 W 9,00W 27,32 S 41,79 W 9,00W 30,46 S 47,02 W 0,00W 33,50 S 51,28 W 1,OOW 36,83 S 55,32 W 3.00W 40,05 S 59.44 W 7.00W 43,30 S 64,08 W O,OOW 47,19 S 69,34 W O,COW 52,23 S 75,35 W 9,0OW 57,54 S 82,79 W 3,0OW 62,82 S 92,31 W 5.0OW 68.73 S 104,43 W 7,00W 72,80 S 120,76 W 9,OOW 73,17 S 141,97 W 9,00W 72.72 S 167.42 W 7.00W 75.69 S 195.60 W C L 0 DISTANCE 0,00 0.00 0',00 1.39 5.37 12.05 20,30 2b.79 36.42 43.18 49,93 56,03 61,25 66,46 71,6~ 77,34 83.87 91.68 100,82 111.66 125.,02 141,01 159,72 182,54 209,73 U R E S ANGLE D M S 0 0 0 w S 0 0 0 .~ S 0 0 0 w N 64 29 '59 v, S 66 46 40 w S 59 22 56 w S 56 47 3 w S 56 15 2b S 56 12 13 v. S 56 29 5 w S 56 49 30 w S 57 3 43 S 56 50 36 S 56 20 41 w S 56 1 41 W S 55 57 9 w S 55 45 41. ~ S 55 16 10 w S 55 11 58 '~ S 55 45 50 ¥o S 56 38 57 w S 58 54 56 W S 62 43 58 W S 66 31 11 W S 68 50 43 w DOG LEG SEVERITY DEG/iOOFT 0,000 b.ooo 0.000 2.006 1.250 1.250 0.501 0,250 0.750 0.250 0.250 1,000 0.471 0.052 0..105 0,500 O.501 1,000 0,507 1,501 1,501 2.625 2.509 2.500 1,560 SECTI'N DISTAh.,~ O.OO O.CC 0.00 0,85 5.36 12,Ga 20,18 20,59 36.10 42,59 49,63 55,72 5G.~-~ 71.14 76.75 83.20 90,~4 99,68 110,76 124.24 140.64 159.71 182.20 208.66 UNION 33-1'4RD GYROSCOPIC SUR.VEY JOB NO 4416 RECORD OF SURVEY 25 FEB 81 ! TRUE MEAS, DRIFT VERTICAL DEPTH ANGLE DEPTH 2500 20 0 2600 23 0 2700 27 0 2800 28 0 2900 29 30 3000 30 3O 3100 31 15 3200 32 0 3300 32 15 3400 32 15 3500 33 0 3600 33 0 3700 33 0 3800 33 0 3900 33 0 4O00 32 30 4100 33 3O 420O 3S 0 4300 32 0 4400 32 0 4500 31 0 4600 30 30 ~700 30 30 4800 30 30 4900 29 30 5000 29 45 5100 29 15 5200 28 45 5300 28 0 2478.63 2571.66 2662,27 2750.97 2838.64 2925.24 3011,07 3096,22 3150.91 3265.48 3349.70 3433.57 3517.44 3601.30 3685.17 3769,27 3853.14 393'6.77 4021.11 4105.91 4191.17 4277.11 4363.28 4449.44 4536.04 4622.97 4710.01 4797.47 4885.45 SUB ,SEA 2384.63 2477,66 2568.27 2656,97 2744.64 2831.24 2917,07 3002.22 3086,91 3171,48 3255,70 3339.57 3423.44 35O7.30 3591.17 3675.27 3759.14 3842.77 3927.11 4011.91 4097.17 4183.11 4269.28 4355.44 4442.04 4528.97 4616.01 4703.47 4791.45 DRIFT DIREC DEG, S75.00W S76.00w SSO.OOW S74.00W S66.00W S64.00w S65.00W S65.00w S64,50W S66.00W S66.00W S66.00W S67.00W S67.00W 568.00W S69.00W S67.00W S69.00W S67.00W S65.00W S62.00W S62.00W $63.00W S63.00W S64.00w S63,00W S62.00W S63.00W S63.00W TOTAL COORDINATES 83.36 S 226.38 W 92,54 S 261.86 W '10'1.32 S 303.18 W iii.70 S 348,15 W 128.14 S 393.31 W 149.27 S' 438.62 W 171.36 S 484.9'4 W 193.52 S 532.46 W 216.20 S 580.56 W 238.54 S 629,02 W 260,47 S. 678.27 W 282,62 S 728,02 W 304.34 S : 777.97 W 325,62 S 828,10 W 346.46 S ~ 878.42'W 366,29 S 928.75 W 386.69 S 979,25 W 407.23 S 1030.08 W 427.36 S 1079.90 W '448.91 S 1128.31 W 472,22 S 1175.06 W 496.22 S 1220.20 W 519.66 $ 1265.22 W 542.70 S 1310.44 W 565.01 $ 1355.19 W 587.07 S 1399.43 W 609.80 S 1443'11 W 632.19 S 1486.11 W 653.76 S 1528.45 W CLOSURES DI STANCE ANGLE D M 241.24 S 69 277.73 S 70 319.66 S 71 365.63' S 72 413.66 S 71 463.33 S 71 514.33 S 70 566.54 S 70 619.51 S 69 672.73 S 69 726.56 S 68 47 1 W 32 .12 W 31 13 W 12 39 W 57 14 W 12 20 v. 32 17 w 1 34 W 3426 W 13 52 W 59 30 w 780,96 S 68 46 59 W 835,38 S 68 38 3 W 889,83 S 68 32 3 w 944,28 S 68 28 28 W 998.38 S 68 28 33 W 1052,84 S 68 27 5 W 1107.66 S 68 25 44 ~ 1161.39 S 68 24 33 W 1214.33 S 68 18 14 W 1266.40 S 68 6 22 W 1317.25 S'67 52 10 W 1367.79 S 67 40 14 W 1418.38 S 67 30 13 W 1468.26 S 67 22 2 ~ 1517.58 S 67 14 29 w 1566.66 S 67 5 33 ~ 1614.99 S 66 57 18 w 1662.40 S 66 50 31W DOG LEG SEVERITY DEG/IOOFT 3.009 3.004 4.084 1.658 2.452 1.125 0.797 0.750 0.288 0.800 0.750 0.000 0.545 0.000 0.545 0.577 1-171 0,776 1.147 1,060 1,278 O.50O 0.508 0.000 1.029 0.351 0.554 0.551 0.750 SECTIOh DISTANCE 239.57 27~-36 31~_.~17 360.96 408.66 458.63 509.93 562.34 615.49 668.81 722.6D 777.C4 831.41 885.74 940.04 993.89 1048.15 1102-77 1209.21 1261.45 1312.57 1363.33 1414.08 1464.08 1513.51 1562.75' 1611.22 1658.75 ,U":, I ON 33- 1.4RD GY. ROSCOPIC SUR. VEY RECORD OF SURVEY JOB NO 4416 25 FEB 81 MEAS. DRIFT DEPTH ANGLE D I',,4 5400 27 30 5500 27 30 5500 27 0 5700 25 15 5800 25 30 590O 25 0 6000 24 45 6100 24 15 6200 23 45 6300 23 0 6400 22 0 6500 21 0 6600 21 0 6700 21 15 6800 21 30 6900 21 15 7000 21 0 7103 20 30 7200 20 30 7300 20 15 7400 20 15 7500 21 0 7600 21 0 7700 20 30 7800 20 45 7900 20 15 8000 21 0 8100 22 0 8200 22 15 TRUE VERTICAL DEPTH 4973.95 5062.65 5151.55 5240.95 5330.92 5421.37 5512.09 5603.09 5694,44 5786.23 5878.62 5971.66 6065.02 6158.30 6251.42 6344,54 6437.82 6531.33 6625.00 6718.74 6812.56 6906.15 6999.51 7093.02 7186.61 7280.28 7373.87 7466.91 7559.55 SUB SEA 4879,95 4968.65 5057.55 5146,95 5236,92 5327.37 b418.09 5509.09 5600,44 5692.23 5784.62 5877,66 5971.02 6064,30 6157,42 6250.54 6343.82 6437.33 6531.00 6624.74 6718,56 6812,15 6905,51 6999.02 7092.61 7186,28 7279.87 7372.91 7465.55 DRIFT DIREC DEG. S62,00w S64.00W 564,00W S64.00W S64,00W S64,00W 564,00W S64 · OOW S65.00w 564,00W S64,00W S64,50w S65.00W S65.00W S64,00W S66.00W S68,00W S67.00W S67,00W S68.00W S68.00W S69.00W S69.00W S68.00W S68.00w S68.00W S71.OOW STO.OOW S69.00W TOTAL COORDINATES 675,26 S 696.23 S 716,30 S 735,94 S 755.07 S 773,77 S 792,21 S 810,39 S 827,90 S 844 · 98 S 861.76 S 877.68 S 892 · 97 S 908.20 S 923 · 89 S 939.29 S 953.37 S 966.93 S 980.61 S 993.94 S 1006.90 S 1019.81 S 1032.66 S 1045.64 S 1058.84 S 1071,96 S 1084.29 S 1096.52 S- 1109,71 S 1569,75 W 1610,89 W 1652,05 W 1692,32 W 1731,55 W 1769.89 W 1807,70 W 1844,97 W 1881,68 W 1917.49 W 1951.88 W 1984,89 W 2017.31W 2049.97 W 2082.86 W 2115.90 W 2149.07 W 2181.80 W 2214.04 W 2246.20 W 2278.29 W 2311.07 W 2344.52 W 2377.49 W 2410.15 W 2442.62 W 2475.61 W 2510.16 W 2545,43 W CLOSURES DISTANCE ANGLE D M S 1708,83 S 66 43 25 W 1754,91 S 66 37 33 w 1800,65 S 66 33 33 W 1845,42 S 66 29 49 w 1889,02 S 66 26 21 w 1931.64 S 66 23 8 W 1973,67 S 66 20 5 W 2015,10 S 66 17 12 W 2055.76 S 66 15 4 W 2095,41 S 66 13 5 W 2133,65 S 66 10 42 W 2170,28 S 66 8 45 W 2206,11 S 66 7 23 w 2242.14 S 66 6 18 W 2278.58 $ 66'4 46 W 2315.01 S 66 3 44 W 2351.05 S 66 4 36 ~ 2386,47 S 66 5 52 ,' 2421,48 S.66 6 39 W 2456,29 S 56 7 50 w 2490,88 S 66 9 24 w 2526,08 S 66 11 21 W 2561,87 S 66 13 43 w 2597,27 S 66 15 34 W 2632.48 S 66 16 58 W . 2667.49 S 6~ 18 19 w 2702.65 S 66 20 49 ~,, 2739,21 S 66 24 9 W 2776,81 S 66 ,26 40 W DOG LEG SEVERITY DEG/iOOFT 0,544 0.923 0.500 .0.750 0.750 0.500 0,250 0.500 0,526 0.765 1.002 0.179 0.250 0.284 0.363 0,358 0.515 0.000 0.277 0.000 0.761 0.000 0.515 0.250 0,500 0.843 1.010 0.288 SECTION DISTANCE 1705.31 175~.48 179..~26 1842.07 1885.70 1928,35 1970,41 2011.87 2052,53 2092.20 2130,4o 2167.10 2202.92 2238.94 2275.37 2311.8G 2347.75 2383.07 2452.72 2487.20 2522.27 2557.91 2593.18 2628.27 2663.1~ 2696.16 2734.50 2771.92 .UNION 33-1'4RD GYROSCO'PIC SURVEY JOB NO 4416 2b FEB 81 ' RECORD OF SURVEY ,.'"EAS. DEPTH 8300 ~4C0 2600 8700 8800 P~O0 9O00 9100 9200 o300 9400 9500 9600 9700 9800 9900 10000 10100 10200 lO300 19400 10500 10600 10700 IOBO0 10900 11000 11100 · TRUE D'R I FT VERTICAL AN,SLE DEPTH 22 45 7651,94 23 0 '7744,07 23 15 7836.04 23 30 7927,83 22 30 8019,88 21 30 8112,60 20 15 8206,03 1~ 30 8300,36 17 15 8395,53 14 0 84~1,83 12 0 R589,26 11 30 8687,16 lO 0 87~5.40 9 45 8883,92 8 30 8982,65 6 15 9081,82 5 0 9181,34 3 0 9281.09 3 0 9380.95 3 15 9480.80 4 0 9580.60 5 30 96B0.26 5 30 9779.80 6 15 9879.27 10 30 9978.18 12 0 10076.26 15 0 10173.48 17 30 10269.48 lq 0 10364.45 SUB SEA DRIFT DIREC DEG. 7557.94 S70 7650.07 S69 7742.04 S69 7833.83 S69 7925.88 S70 8018.60 S68 8112,03 S66 8206,36 S64 8301,53 S63 8397,83 S63 8495.26 S64 8593.16 S65 8691.40 S67 8789.92 S60 8888.65 S56 8987.82 S55 9087.34 S60 9187.09 S40 9286,95 S40 9386.80' S12 9486,60 S19 9586.26 S39 9685,80 S53 9785.27 S58 9884.18 S64 9982.26 S66 10079.48 S72 10175.48 S72 10270.45 S72 TOTAL COORDINATES · OOW 1123.11 S 2581.28 W · OOW 1136.73 S 2617.69 W · OOW 1150.80 S 2654.35 W · OOW 1165.02 S 2691.39 W · OOW 1178.70 S 2727.99 W · OOW 1192.13 S 2762.96 W · OOW 1206.05 S 2795.76 W · OOW 1220,07 S 2825,82 W · OOW 1233.76 S 2853.29 W · OOW 1245.99 S 2877.29 W · OOW 1256.03 S '2897.42 W · OOW 1264.79 S 2915.80 W · OOW 1272.38 S 2932.83 W · OOW 1280.03 S 2948.17 W · OOW 1288.43 S 2961.62 W · OOW 1295.70 S 2972.20 W · OOW 1300.96 S 2980.46 W · OOW 1305.42 S 2985.78 W · OOW 1309.43 S 2989.14 W · OOW 1314.28 S 2991.51 W · OOE 1320.5'2 S 2991.13 W · OOE 1327.72 S 2987.13 W · OOE 1334.37 S 2980.25 W · OOE 1340.16 S 2971.82 W · OOE 1347.22 S 2959.09 W · OOE 1355.46 S 2941,41 W · OOE 1363.82 S 2919,63 W · OOE 1372.47 S 2893.02 W · OOE 1382,15 S 2863,24 W CLOSURES DISTANCE ANGLE D M S 2815.03 S 66 2853.85 S 66 2893.09 S 66 2932.72 S' 66 2971.75 S 66 3009.17 S 66 3044.80 S 66 30 77.96 S 66 3108.61 S 66 3135,49 S 66 35 3157.95 S 66 33 3178,30 S 66 33 3196.95 S 66 32 3214.06 S 66 31 3229.74 S 66 29 3242.35 S 66' 26 3252.0Z S 66 25 3258.68 S 6b 23 3263,37 S '66 20 3267.49 S~ 66 16 3269.65 S 66 10 3268,92 S 66 2 3265.34 S 65 52 3260.03 S 65 43 3251.34 S 65 31 3238.70 S 65 15 3222.46 S 64 57 3202,07 S 64 37 3179.38 S 64 13 29 9 ~ 31 37 w 33-38 W 35 37 w 37 54 w 39 40 w 39 55 W 3B ~0 W 36 58 W DOG LEG SEVERITY DEG/iOOFT 0.522 0,2'93 0.250 0.250 1.,011 1,035 1.273 1,762 1,253 3,250 2.000 0.502 1.501 0.321 1.253 2.250 1.251 2.001 0,000 0.266 0.765 1.511 1.339 0.752 4.255 1.502 3.027 2.500 1.500 SECTION DISTANCE 2809.94 28~ i57 288~,63 2927,09 2965,92 30.03,17 3038.72 3071,87 3102,56 3129o~? 3151,99 3172,3~ 3190,97 3208.11 3223.90 3236.63 3246.38 325 14 325~.96 3262.20 3264.75 3264.46 3261.34 3256.45 3Z48.30 3236.28- 3220.65 3200.85 3178.69 UNION 33-1~RD GYROSCOPIC SURVEY JOB NO 4416 25 FEB 81 . RECORD OF SURVEY ,, TRUE ',"CAS, DRIFT VERTICAL DEPTH ANGLE DEPTH 11200 17 30 10459.41 11300 19 0 10554,38 11400 22 0 10648,04 POTTO~ HOLE CLOSURE SUB DR I F T SEA DIREC DEG. 10365.41 S7~,OOE 10460,38 S75.00E 10554,04. S76,00E TOTAL COORDINATES 1391.30 S 2833,29 1399.67 S 2803.11 1408.44 S 2769.21 3106,81 FEET AT S 63 2 30 W CLOSURES DISTANCE ANGLE D M 3156,46 S 63 50 46 w 3133,14 S 63 27 56 w 3106.81S 63 2 30 W DOG LEG SEVERITY DEG/IOOFT 1,511 1,504 SECTION DISTANCE 3156,15 3133.05 UNION 33-14RD · ~¢EASURED DEPTH AND OTHER DATA GYROSCOPIC SURVEY JOB FOR EVERY EVEN 100 FEET OF NO 4416 SUB SEA DEPTH, MEAS'URED DEPTH 194 294 394 494 595 695 795 896 996 1096 llg6 1296 1396 1497 1597 1697 1798 1898 1999 2100 2203 2306 2411 2516 2624 2736 2B49 2.064 3080 3197 3315 3434 3553 3672 3791 TRUE VERTICAL SUB DEPTH SEA MD-TVD DIFFERENCE 194, 100 0 294, 200 0 394, 300 0 494, 400 0 594, 500 0 694, 600 1 794. 700 1 894. 800 2 994, 900 1 1094. 1000 2 1194, 1100 2 1294, 1200 2 1394. 1300 2 1494, 1400 2 1594, 1500 2 1694, 1600 3 1794. 1700 3 1894. 1800 4 1994, 1900 5 2094, 2000 6 2194, 2100 8 2294. 2200 12 2394. 2300 16 2494. 2400 22 2594. 2500 30 2694. 2600 41 2?94. 2700 54 2894, 2800 69 2994. 2900 86 3094. 3000 103 3194, 3100 121 3294, 3200 139 3394. 3300 159 3494. 3400 178 3594. 3500 197 VERTICAL CORRECTION 0 0 0 0 0 1 0 1 -1 1 0 0 0 0 0 1 0 1 1 1 2 4 4 6 8 11 13 15 17 17 18 2O 19 19 TOTAL 0 0 1 5 10 15 20 23 27 30 33 36 .39 43 47 52 57 62 68 72 73 72 76 84 94 104 118 141 166 192 219 245 272 298 323 'COORDINATES .00S · 62 N ,93 S .85 S ,85 S ,75 S ,06 S ,69 S · 17 S ,35 S ,36 S .70 S · 92 S · 19 S ,05 S ,06 S ,42 S .71 S · 66 S · 80 S · 16 S · 71 S ,40 S ,79 S · 77 S ,45 S .88 S · 37 S · 97 S · 85 S · 69 S · 90 S .17 S · 35 S · 71 S 0.00 i1,10 4,66 10.01 16,60 23,60 29,97.W 35.75 41,54 46,84 51.12 55.15 59.27 63,91 69.17 75.15 82,59 92.09 104,30 120,76 142,63 169,08 198,66 231.73 271,16 319.17 370.29 422.15 475,56 531,02 587.76 645,53 704.55 763.95 823,59 ONION 33-.14R D MEASURED DEPTH AND · MEASURED DEPTH .; 3910 4029 4149 425~_ 43~6 a503 4620 4851 4967 5092 5196 5319 5423 5535 5647 5759 5870 5980 6090 6199 6308 6417 6524 6631 6738 6R46 6953 7060 7167 7274 7380 7487 7504 7701 OTHER DATA TRUE VERTICAL SUB DEPTH SEA GYROSCOPIC SURVEY FOR EVERY EVEN 100 MD-TVD DIFFERENCE FEET 3694. 3600 216 3794, 3700 235 3894. 3800 255 3994. 3900 274 4094. 4000 292 4194. 4100 309 4294, 4200 326 4394, 4300 342 4494, 4400 357 4594, 4500 372 4694, 4600 388 4794, 4700 402 4894, 4800 416 4994. 4900 429 5094, 5000 441 5194, 5100 453 5294, 5200 465 5394, 5300 476 5494, 5400 486 5594, 5500 496 5694, 5600 505 5794, 5700 514 5894. 5800 523 5994. 5900 530 6094. 6000 537 6194, 6100 544 6294. 6200 552 6394. 6300 559 6494, 6400 566 6594, 6500 573. 6694. 6~00. 580 6794. 6700 586 6894. 6800 592 6994, 6900 600 7094, 7000 607 VERTICAL CORRECTION 19 19 20 19 18 1.7 17 16 15 15 16 14 14 13 12 12 12 11 10 10 9 9 9 7 7 7 8 7 7 7 7 6 6 8 7 JOB NO OF SUB 4416 SEA DEPTH, TOTAL COORDINATES 348,50 S 883,47 371,97 S 943,33 397,00 S 1004,11 420.78 S 1064.17 445,78 S 1121,55 472.95 S I176,42 500.88 S 1228,99 527,87 S 1281,34 554,26 S 1333,38 579,60 S 1384,68 605.60 S 1435,17 631.32 S 1484,39 655,'83 S 1532,49 680.13 S 1578,98 703.29 S 1625.37 725.59 S 1671,.11 747,30 S 1715,61 768,16 S 1758,38 788,54 S 1800,16 808,59 S 1841,27 827.73 S 1881.31 846,35 S 1920,29 864,47 S 1957,44 881.42 S 1992,61 897,67 S 2027,39 914,07 S 2062,46 931,10 S 2097,95 946,92 S 2133,46 961,48 S 2168.83 976.08 S 2203.37 990.49 S 2237.73 1004.31 S 2271.~ 1018,14 S 2306.73 1031.89 S 2342.52 1045,77 S 2377.81 25 FEB 81 UNION 33-1'4RD GYROSCOPIC SUR~EY JOB MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF NO 4416 SUB SEA DEPTH, 25 FEB 81 t TRUE MEASURED VERTICAL DEPTH DEPTH ! SUB MD-TVD SEA DIFFERENCE VERTICAL CORRECTION TOTAL COORDINATES 7~08 7194. 7015 7294. B022 7394. 8129 7494. ~237 7594. 83a6 7694. 8454 7794. 8563 7894, 8672 7994. 8730 8094. 8~87 8194. 8993 8294. 9093 8394. 92O2 8494. 93O5 8594. 9407 8694. 9509 8794. 9610 8894. 9711 8994. 9~12 9094. 9913 9194. 0013 9294. 0113 9394. 0213 9494. 0313 9594. 0414 9694. 0514 9794. 0615 9894. 0716 9994. 0~18 10094. 0~21 10194. 1026 10294. 1131 10394. !236 10494. 1342 10594. 7100 614 7200 620 7300 627 7'400 635 7500 643 7600 651 7700 660 7800 669 7900 678 8000 686 8100 693 8200 699 8300 704 8400 708 8500 711 8600 713 8700 715 8800 716 8900 717 9000 718 9100 719 9200 719 9300 719 9400 719 9500 719 9600 720 9700 720 9800 720 9900 722 10000 724 10100 727 10200 731 10300 737 10400 742 10500 748 7 6 7 8 8 8 9 9 9 8 7 6 5 4 3 2 2 1 1 1 1 0 0 0 0 1 0 0 2 2 3 4 6 5 6 1059.88 S 1073.64 S 1086.83 S 1100.27 S 1114.71 S 1129.23 S 1144.31 S 1159.74 S 1174.99 S 1189.39 S 1204.22 S 12 19.09 S 1233.49 S 1246.21 S 1256.47 S 1265 · 38 S 12 72.98 S 1280.87 S 1289,33 S 1296.43 S 1301 · 52 S 1305.94 S 1309.97 S 1315.02 S 1321.39 S 1328.74 S' 1335.17 S 1341.05 S 1348.50 S 1356.99 S 1365.53 S 1374.89 S 1385.18 S 1394,30 S 1403.27 S 2412.74 2447.33 2482.95 2520.37 2558.58 2597.87 2637,44 2677.64 2717.85 2756.12 2791.63 2823.82 2852.76 2877.72 2898.32 2917.05 2934.22 2949.63 2962.95 2973.26 2981.38 2986.21 2989.56 2991.64 2990,80 2986e28 2979.17 2970.38 2956.44 293?,90 2914.37 2885.58 2853.73 2822.72 2789.47 UNION 33-19aD INTERPOLAT£D VALUES FOR EVEN , TRUE qEASURED VERIICAL DEPTH DEPTH · lOOO 998. 9 2000 1994. 19 3000 2925. 28 4000 3769. 36 5000 4622. 45 600O 5512, 54 7000 6437, 63 8000 7373. 72 9000 8300. 82 10000 9281. 91 11000 10269. 101 GYROSCOPIC SURVEY JOB NO 1000 FEET OF HEASURED DEPTH, SUB SEA TOTAL COORDINATES 04, 27.32 S CO, 68 · 73 S 31, 149.27 S 75 · 366 · 29 S 28, 587,07 S 18, 792.21 S 43 · 953 · 37 S 79, 1084,29 S 06. 1220,07 S 87, 1305.42 S 75, 1372,47 S 41.?9 W 104.43 W 43.8.62 W 928,75 W 1399.43 W 1807 · ?0 W 2149,07 W 2475.61 W 2825 · 82 W 2985.78 W 2893,02 W 4416 25 FEB 81 ....... HORIZONTAL VIEW UNION OIL OF CALIFORNIA GRANITE POINT WELL 3:3-14 RD --. ~ RADIUS OF CURVATURE. - --- GYROSCOPIC SCALE I" = I000' MARCH 5, 1981 _ · _.~. ..................... i --. ....... . qo~ TMD= 11,400' ,~- ALL DEPTHS SHOWN ARE TVD ' IZO0- 1600 . ..... ~oo~ MARCH 5, 1981 Z40C VERTICAL SECTION UNION OIL OF CALIFORNIA GRANITE POINT WELL 53-14 RD RADIUS OF CURVATURE GYROSCOPIC' SCALE I" = 4800 5600 ALL DEPTHS SHOWN ARE TVD 680C 72l 760C 840( 8800 9ZO0- ~ . 9600- , ....... I0,000- 10,400. TVD = 10,648'-- Check Form for timely compliance with our regulations. Operator, We11 Name and Number Reports and Materials to be received by: Date Completion Report i:?" Wel 1 History ~ ~.,..~,~"\ S~es Mud Log Core Chips Core Description Inclination Survey Required Yes Yes Date Received Drill Stem Test Reports,I '/~/~ ..... Production Test Reports I~ ~ ~'-~-' Logs Run Yes Remarks CURVE DATA. LO.CATED' IN THE APPENDIX STATE OF ALASKA - ~ ALASKA ~ AND GAS CONSERVATION CC '~ISSION MONTHLY REPORT OF DRILLING Aw_ Nr rWORKOVER OPERATIONS 1. Drilling well [] 2. Name of operator UNION OIL COMPANY OF CALIFORNIA 3. Address PO BOX 6247, ANCHORAGE= AK 4. Location of Well atsurface 2371 'S & 1258'E of the NW corner, Sec. 13, TION, R12W, SM. 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KB 95' Above MS~ A~l_ #18761 7. Permit No. 68-4 8. APl Number 50- 1 9. Uni{ ~r"Le~s~'r~a~e Union/Mohi! S~ate #1 10. Well No. 11 ,'~ i~ld "~ ~'d~Pob I' Granite Point/M~ddle Kena~ For the Month of Fehr~_!ary ,19 8l 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 11410' TD 11.95' Drilled 13. Casing or liner run and quantities of cement, results of pressure tests 7" 29# P-110 Buttress Liner f/ 8912' to 10505' cemented with 400 sxs cmt. 5" 18# N-80 Buttress Liner f/10460' to 11410' cemented with 200 sxs cmt. Both liners pressure tested to 4000 psi. 14. Coring resume and brief description No cores. 15. Logs run and depth where run DIL-SP-GR f/ 10505' FDC-CNL-GR f/ 9164' to 10686' to ll400' (Open Hole) (Cased Hole) 6. DST data, perforating data, showsof H2S, miscellaneous data 10,000' to 10,044' 11,044' to 11,074' All perfs were 10,390' to 10,455' 11,104' to 11,194' 10,490' to 10585' 11 230' to 11 246' 10,716' to 10,756' 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. '- ' - .... NOT~-Report on this form is req e o~y,,~,e.~a~._~ ~l~,~r-/-- of operations, and must be filed in duplicate with the Alaska Oil a~d Gas Conservation Commissio~/~l~,/6f'tlTe~s~-ccc~-[]i?~-Crt~~rwise'directed. Form 10-404 ~ / 8ubmit in duplicate Rev. 7-1-80 February 13, 1981 Re: The application of Union 0il Company of California for an exception to 20 AAC 25.030(b) (5) (B) and (C) for Granite Point State , that all cemented .m 00 feet and be pressure tested. Mr. Jim R. Callender District Drilling Supervisor Union Oil Company of California P. O. Box 6247 Anchorage, Alaska 99502 Dear Mr'. Callender: The application received on February 11, 1981 stated that an exception is necessary because a 7" liner was set @ 10505' which, according to the logs in G.P.S. %33-14's original hole, would have been only to the top of the "B" zone, but in the redri11 it is 110' into the "B" zone sand. This was not dis- covered until the 7" had been set and cased hole logs had been run. No open hole logs were run because of the poor hole conditions existing which required the 7" liner to be set at less than total depth. You proposed to set a 5" liner in 6 1/8" hole from 10480' to 11500' and cement with a minimum of 100 saxs of cement. This would allow perforating the "B" zone from + 10380' to ~ 10480' and from _+ 10505' to , 10620' and the subsequent completion as a water injector. (The #A# and "C" zones will be perforated as originally proposed in the permit to drill and will not require an exception). You stated that if an exception is not granted, the "B" zone completion would be limited to perforations from ~+ 10505' to ~ 10620' resulting in the loss of 100' of perfora- tions and 156,000 barrels of oil which would otherwise be recovered. In regards to the pressure testing of the liner lap, if the casing is perforated from _+ 10380' to ~ 10480' and the 5" casing from ~ 10505' to_+ 10620', for injection into the zone you state that it is not required to have isolation be- tween the 5" and 7" liners as any fluid escaping down the 5" x 7" annulus would be injected in the "B" zone also. Mr. Jim R'. Callender Page 2 February 13, 1981 The Alaska Oil and Gas Conservation Commis. sion hereby grants the requested exception for the reference well pursuant to Rule ? of' Conservation Order No. 76. Very truly yours, ~Hoyll H. Ham£1ton Chairman BY ORDER OF THE ~MMISSION ~' ' ~ STATE OF ALASKA ALASKA' '}L AND GAS CONSERVATION C )MISSION ~-- MONTHLY REPORT'OF DRILLING AND WORKOVER OPERATION · Drilling well [] Workover operation ~ 2. Name of operator 7. Permit No. UNION OIL COMPANY OF CALIFORNIA 68-4 ~ o-/cf ~ 3. Address 8. APl Number P.O. BOX 6247, ANCHORAGE, ALASKA 99502 50-133-20079 --o ~ 4. Location of Well at surface 2371'S & 1258'E of the N.W. cor., Sec. 13, T10N, R12W, S.M. 5. Elevation in feet (indicate KB, DF, etc·) 6. Lease Designation and Serial No. KB 95' Above MSL ADL #18761 9. Unit or Lease Name Union/Mobil State #1 10. Well No. GPS #33-14 ~-~0 11. Field and Pool Granite Point/Middle Kenai For the Month of. January ,19 81 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Drilled f/9492' to 9662' & stuck pipe. Attempted to wash over & rec. fish w/no luck. Plugged back to 9169'. Drilt&d f/9169' to 10338' & stuck pipe. Attempted to wash over & rec. fish with no luck. Plugged back to 10130'. Drilled f/10130' to 10215'. Currently drilling @ 10215'. (Drilled 1424' gross feet during month). 13. Casing or liner run and quantities of cement, results of pressure tests No casing ran. 14. Coring resume and brief description No cores. 15. Logs run and depth where run No Logs. 1 6. DST data, perforating data, shows of H2S, miscellaneous data RECEIVEI) No DST's, Etc. FEB 1 ? 1981 Alaska 0il & Gas Cons, Commission A~clmrage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. E~~'~' .~~~ Dist. Drlg. Supt. 2/11/81 SIGN . ITLE ....... DATE NOT~eport on th~s form m required for each calendar month regardless of the status of operations, and must be filed in duplicate with th® Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Rev. 7-1-80 Submit in duplicate Union Oil and Gas Div,~ion: Western Region Union Oil Company o:California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 union February 11, 1981 Mr. Hoyle Hamilton Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Mr. Hamilton: In order to complete G.P.S. #33-14RD in a manner that will allow the maximum recovery of oil, it is necessary to request an exception to the rule, (20~C 25.030-5-B&C), that all cemented liners have a minimum of 100' of lap and be pressure tested. This has become necessary because a 7" liner was set @ 10505' which according to the logs in G.P.S. #33-14's original hole, this would have been only to the top of the "B" zone, but in the redrill it is 110' into the "B" zOne sand. This was not discovered until the 7" had been set and cased hole logs had been run. No open hole logs were run because of the poor hole conditions existing which required the 7" liner to be set at less than T.D. It is therefore proposed to set a 5" liner in 6 1/8" hole from 10480' to 11500' and cement with a minimum of 100 sxs. of cement. This will allow perforating the "B" zone from + 10380' to + 10480' & from + 10505' to + 10620' and the subsequent completion as an injector. (The "A" and "C" zones will be perforated as originally proposed in the permit to redrill and are not affected by this exception). If the exception is not granted, the "B" zone completion will be limited to perforations from + 10505' to ~ 10620' resulting in the loss of 100' of perforations and 156,~00 barrels of oil which would otherwise be recovered. In regards to the pressure testing of the liner lap, if the 7" is perforated from + 10380' to + 10480' and the 5" from + 10505' to + 10620' for injection into the "B" zone it is not required to have isolation between the 5" & 7" liners as any fluid escaping down the 5" x 7" annulus would be injected in the "B" zone also. JRC: j mo R£[EI VEfl FEB 1 1 1981 Alas~ 0il & Gas Cons. C°~r~issio~ A~Chorage V~ery truly yours, R. Callender Dist. Drlg. Supt. SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. UNION OIL COMPANY OF CALIFORNIA 80-149 '3. Address 8. APl Number P.O. BOX 6247, ANCHORAGE, AK. 99502 50-733-20079 -4. Location of Well 2371'S & 1258'E of the N.W. cor., Sec. 13, T10N, R12W, S.M. 5. Elevation in feet (indicate KB, DF, etc.) KB 95' above MSL 12. I 6. Lease Designation and Serial No. ADL - 18761 9. Unit or Lease Name Union/Mobil State #l 10. Well Number GPS #33,14RD 11. Field and Pool Granite Point/Middle Kenai Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It has been determined that the 7" liner from + 8912' to + 10505' in Well GPS #33-14RD is set 110' into the "B" zone. This necessitates requesting an excePtion of regulation 20 AAC 25.0305 (B), (C), in order to complete the "B" zone in the most productive manner. PROCEDURE: 1. Drill 6 1/8" hOle to 11,500' T.D. 2. Set 5" liner from + 10,480' to + 11,500' and cmt. w/ a minimum of 100 sxs. cmt.~ 3. Perforate "B" zone from + 10,380' to + 10,480' and + 10.,'505' to + 10,620'. 4. Perforate "A" & "C" zones as originally proposed. (See Attached) J ECEIVED Alaska Oil.& Gas Cnn.; ~'~lChorag'~ C~"'"nissiorl 14. I hereb~ certify that the foregoing is true and correct to the best of my knowledge. I ~'~~~/~ Dist. Drlg. Supt. Signed j Title Th e//q~el~w-fo r-Corem issio n use Cort~lftions of Approval, if any: 2/11/81 Date Approved Copy Returned ~~. '~~, /~ By Order of Approved by _ ; ~ COMMISSIONER the Commission Form 10-403 Rev. 7-1 Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL E~ COMPLETED WELL [] OTHER 2. Name of Operator 7. Permit No. UNION OIL COMPANY OF CALIFORNIA 80-149 3. Address 8. APl Number P.O. BOX 6247, ANCHORAGE, ALASKA 99502 50- 733-20079-01 4. Location of Well 2371'S & 1258'E of the N.W. Cor., Sec. 13, T10N, R12W, S.M. 9. Unit or Lease Name UNION/MOBIL STATE #1 10. Well Number CPS 33-14RD 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. GRANITE POINT-MIDDLE KENAI _ ER 95' AR~V~ Hg!. I ADL-18761 12. Check ApproPriate Box To Indicate Nature of Notice, Reppr. t~-or'Ot'~'~-D'~ta- ..... NOTICE'OF INTENTION TO: <.. SUBSEQUENT REPORT OP (Submit in Triplicate) Perforate [] Alter Casing Stimulate [] Abandon Repair Well [] Change Plans Pull Tubing [] Other Perforations [] Altering Casing [] Stimulation [] Abandonment [] Repairs Made [] Other [] Pulling Tubing [] Plug back & sidetra (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). . , The stuck drilling assembly in well 33-14 was sidetracked as follows: 1. Plug backed f/top of fish @ 9638' (bottom @ 9662') to 9050' w/300 sxs. cl. "G" w/10% sand and .3% R-5 thru O.E.D.P. hung @ 9638'. C.I.P. 1/7/81. . . Polished off cmt. plug f/9050' to 9169'. Dyna-Drilled off plug & sidetracked fish. VERBAL APPROVAL GIVEN BY JIM TRIMBLE 1/6/81. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Signe(~4~ ~ ~/~~,/[~2 /7 Title Dist. Drlg. Supt. The~5/~ce below fol Com issiTn use /~'~/~ ~__~/.~,,...~- ' Condlt/ "ionsofApproval, ifany: - Z /' ~ RECEIVED JAN 1 9 1981 Alaska 0il & Gas Cons. Commission Anchorage By Order of Approved by , COMMISSIONER the Commission Date ,f Date 1/16/81 Form 10-403 Rev. 7-1 -~0 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate December 12, 1980 Mr. Robert T. Anderson District Land Manager Union Oil Company of California P. O. Box 6247 Anchorage, Alaska 99505 Re: UniOn-Mobil State 91 GPS ~33-14 RD Union Oil Company of California Permit No. 80-149 Sur. Loc.: 2371'S, 1258'E of ~ cr Sec 13, T10N, R12W, SM. Botto~oIe Loc.: ~I950'W~ 1250'N of SE cr Sec 14, T10N, R12W, SM. Dear Mr. Anderson: Enclosed is the approved application for Permit to drill the above referenced well. Well samples and a mud log are not required. A directional survey is required. If available, a tape containing the digitized log information shall be submitted on al/ logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to Mr. Robert T. Anderson -2- Union-Mobil State $1 GPS%33-14 RD Dec~mber 12, 1980 commencing operations you may be contacted by a representative. of the Department of Environmental Conservation. Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field .work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a repre- sentative of the commission may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension~ or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, H. Hamilton ~V O~D~R OP T~ CO~MISSION Chairman of Alaska Oil & Gas. Conservation Commission Enclosure cc= Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o/eric1. Department of Labor; Supervisor, Labor Law Compliance Division w/o encl. Union Oil and Gas r~J~ison: Western Region Union Oil Company o~)' California P.O: Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 union Robert T. Anderson District Land Manager December 9, 1'980 Mr, Hoyle Hamilton State of Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Mr. Hamilton: GRANITE POINT AR~A State of Alaska Permit to Drill Union-Mobil State #1G?S #33-14 Rd. ADL-18761 (8-86-71-5340-600953) Enclosed for your further handling are three (3) fully executed copies of the above captioned Permit to Drill GPS #33-14 Rd. Also enclosed is our check number 19072 in the amount of $100.00 to cover the required filing fees. Upon approval, we would appreciate a copy to complete our files. Thank you. Very truly yours, sk Enclosures RECEIVED DEC - 9 1980 /~laska 0il &~as. Cons. ComrniSSior~ anchorage PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL [] lb. Type of well EXPLORATORY [] SERVICE ~] STRATIGRAPHIC [] DEEPEN [] DEVEL MULTIPLE ZONE [] 2. Name of operator UNION OIL COMPANY OFCALIFORNIA--- ~DEC-~]980 3. Address P.O. BOX 6247, ANCHORAGE, ALASKA 9950~laska0il & Gas Cons. .__ 4. Location,ofwell atsurface 2371'S & 1258'E. of N.W. corn. of Anchorage 9: ~JB~ or lease name Sect. 13, TION, R12W, S.M. UNION-MOBIL STATE #1 At top of proposed producing interval 10. Well number +_1900'W & 1400'N of S.E. corn. of CPS #33-14 Rd. At total depth Sect. 14 & T10N, R12W, S.M. 11. Field and pool +_1950'W & 1250'N of S.E. corn. of Sect· 14, T10N, R12W, S.M. GRANITE POINT - MIDDLE KENA] 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. 95' KB Above MLLW ADT, 18761 12. Bond information (see 20 AAC 25.025) Type Statewide Surety and/or number United Pacific Ins. CO.Amount $100 ~ 000 . 00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed 28 Miles NW o~ Kenai miles Approx. 3300' feet well Approx. 1300' feet · .. 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 12.,500' MD ll,720'TVD feet 5,089 acres 12/9/80 · 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 0 . psig@ .. Surface KICK OFF POINT +--9260 feet. MAXIMUM HOLE ANGLE 25 o'1 (see 20 AAC 25.035 (c) (2) 1882 .... psig@ 8885 ft. TD (TVD) Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 8~ 7" 29lf N-80 butt. 2500' 9000' 18312' 1150 ~110~730 *400 sxs. minimum 1 I I ~ I *may be mor~ based on caliper log. I ~ I 22. Describe proposed program: .. Abandon the existing wellbore thru a 9 5/8" cement retainer set + 9330' with 400 sxs. of cement or a sqz. perssure of 7000 psi which ever comes first· !. Mill window in the 9 5/8" casing f/+_ 9260' to _+ 9320' & spot kick off plug· 3. Directionally drill 8½" hole to + 11,500' TMD, + 10,730' TVD, TD. ~. Run logs. ~. Run & cement 7" liner f/+ 9000' to + 11,500' TD. ;. Run CBL & Gyro survey (sqz. as needed for zone isolation) Perforate the Middle Kenai "A" "B" and "C" zones as justified by logs · , · Complete the well with 3~" · a ABC modified tubing with down-hole flow regulators. ). Place well on injection. 23. I hereby certify that the foregoing is true and correct to tb~est of[ny knowledge " .,,,.~ SIGNED ITLE District Land M~r. DATE 12/9/80 Thespa~'ebelowforComm~ss~on[~se Robert T. ~e~dn CONDITIONS OF APPROVAL Samples required Mud Icg required Directional Survey required I APl number []]YES ~NO []¥F-,,~. ',~ J~YES i--INOI 50-7.,,15-~oo'77-ol Permit number Approval date ~'u-/~_ 12/12/80 I SEE COVER LETTER FOR OTHER REQUIREMENTS ~ ,COMMISSIONER DATE _~_~_~_~r 1___~; 1cIRCI APPROVED BY by order of the Commission Form 10-401 Submit in triplicate Rev. 7-1-80 .4#GL EO ,FILL UP LIN~ HYDRIL BUND ~,'A~s CHECK V.~L YE . . HY,O~AIdUE OPEPal T£D VALVE · LO-I-O£~UE GAlE C~ LO-TO,~£ G~J TE VALVE 6',4/-E YALV£ REQUIRED i~IOTE ' ,~t.,t.. CHANGES I~UST HAVE WRtT.TEN APPROVAL BY THE DISTRICT DRILLING SUPERiMTENDE[NT VEIl T 'o ~HOKE o* · · . · "'~-" ' BUBBL£. TANK · · · ' . 0£ itOh:rE MADE DEGA$$EH · . _ . . -... . . · · . 'e ' · ':.'.' ': .-.. .' L.P. VALVE, o · · L P. IIA L VES '.~ · POSIITVE CHOKE ADJUST.4BLF ~HOKE · '~ H u~ad. Un/on ~,/II furnish ..~/~ .~.~ ~ '~ ' ' ' e' ' '- ' . -.:-.. :- --. o'.- ~ · · NOTE: ' " ALL CH~NG£S hIUST H.~VE ~,:'RITTEN · APPROVAL BY' THE DISTRICT . o. · DRILLING SUPER:NTENDENT. · t, IIMI/,!UI/. STA/,'£.fi£O ' dHOKE /,:.41,'IFOLD AS£EtI£LY ' ooO /°3/ W,£ '' , . . ~ T : . : i IIIll I L _l__ I J : ~ II m i _l i ~ 114 i i i i , e. e. · DItAWN~O (.~O. , A."D. H.B i. $CALC None / / 0 · AMOCO '/ 7'""'/ MUCI-2 / UNION/MOBIl 0 33-13 ~,~ taucI- t .~,. 0 24-13 I I I / / / / / / / / / / II- 2,4. 0 42-25 © /* ,/ t' ,/ /* /- 12-24 © ZOO0 RECEIVED DEC_ 9 i?e,O Alaska Oil & Bas Cons. Cotntni,8iot Anchorage GRANITE POINT FIELD TOP GRANITE POINT SANDS FEET C.i.' 500 FT. · . CHECK LIST FOR NEW ~LL PERMITS Company Item APl~r eve Da te (1) Fee _//,~/~ /?,~.-f0~ , 1. Is the permit fee attached .......................................... / '~ 2 Is well to be located in a defined pool .... Lease & weii Remarks (2) Loc. (3) k~min .~j~. 3. Is a registered survey plat attached ................................ ,.. 4. Is roll located proper distance frcra property line .................. 5. Is roll located proper d±stance frcm other mils ..................... 7. Is roll to be deviated .................................. 8. Is operator the only affected party ................................. 9. Can permit be approved before, ten-day wait .......................... ] %-~-~c 10. Does operator have a bond in force .......... , ....................... ~ -~11. Is a conservation order needed ...................................... 12. Is administrative approval needed .............. ..................... 13 Is conductor string provided · . ee~eeeeeeeeee eeeeeeeeeeeee®eeeee.eeeeee 14. Is ~enough cement used to circulate on conductor and surface ........ (4) Casg~ /~.~F~ 15. Will c~ment tie in surface and intermediate or production strings ...~~__ d. ~6. Will cement cover all known productive horizons ..................... (5) BOPE ~ 17. Will surface casing protect fresh water zones ...................... 18. Will all casing give adequate safety in collapse, tension, and barst. 19. Does BOPE have. sufficient pressure rating - Test to 3d~ psig ~' Approval R~c~ded: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi .. No special'effort has been made to chronologically organize this category of information. LIBRARY TAPE CURVE SPECIFICATIONS ~'P ,~3'- / q ,eD Company Union Oil of Calif- Well GP 35-14 RD Field Granite Point CoUnty ,State Kenai, Alaska Date 5-17- 81 Curve Name (Abbreviated) Standard Curve Name Logs Used' Scale GR' Gamma Ray CN/MS 0-80 CN Compensated Neutr'on CN/MS 60- 0 .,, LS Long space Neutron CN/MS 0-2000 SS Short Space Neutron CN/MS ........ ,0-2000 .,, · " . f~£C£1~'£o APR - 1 1~ .... Alaska Oil & Gas 'COns 1-' '"' · ~..k ..... ',, 'Ornmt.._. ' -'-',u,age .... oaton ;. ,, ...... ;PAGE 1 UNION OIL OF SRANIT~ POINT .... KENAI, DAYa EVERY 1 Sa,~iPLES CALI~OR~IA .... GP 33-1~ A L ~ ,~ K A .... u-~-;-7-I. ........... 1TTOO .......... 0 .-~TO ~Oaska Oil & Gas con, r~,.,_,__. ....... o--20-0- -- o. o o --' 8 ~ 12 · o O- -.2_~ ............ -3-776-7 ............ O~lYO ...................... ~-~--OO ................................................................................................. 8~:X. 2 o50 '~Z~9~'----~ 0.00 0.'00 ~9i3.00 ;>8.5~ 39.~' - 0.00 ....... 0~00 PAGE 2 UNION 0IL'~ OF GRANITF POINT----KENAI, DATA EVERY 1 SaMP:LES cALIFOR:NIA .... GP AL~A~KA O0 ............................ O-;-'O-O -. - P~c')38 . 00 2~,. 57 -----qr3-.--'iT .... ~0 ...... -0--.--0-0- _~9:5q.50~-- ~1.8~ ---0-,-013 0.00 PAGE ~ UNION OIL OF SRANITF POINT .... KENAI, DATA EVERY ~ S~PLES ALASKA RECE'lvEO PAGE ~ UNION OIL~ OF C~L.I~OR~IA .... Gm: SRANITE POINT .... KENAI, ALiASKA DA~A EVERY 1SAMPL:ES Oo