) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
No. of Completions
1a. Well Status: 0 Oil 0 Gas 0 Plugged IS! Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
DIL, BHeS I GR, FDC, ML I MLL, SNP, LL3, CBL
CASING, LINER AND CEMENTING RECORD
$eJ\l:J~~,Oe~;HMP ß~N(a,PËFgHrY~' , .1)~qLe ' . ' . '. .....'. '. '. , .'. .
. ,'..'fOP':"....'tsOtfQM,' :'rop: ,I:SOTTOM'" '1,'S,z,é .;. " ,CeMEN,.INGRecORD"
Surface 70' Surface 70' 36" 175 sx Fondu I Fly Ash
Surface 931' Surface 931' 26" 2000 sx Fondu I Fly Ash
Surface 4589' Surface 4348' 17-1/2" 3150 sx Class 'G'
Surface 9296' Surface 8226' Tieback 417 sx Class 'G', 118 sx Arcticset
Surface 10410' Surface 9223' 12-1/4" 1370 sx Class 'G', 725 sx Class 'G'
0 GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1080' SNL, 1245' WEL, SEC. 09, T11N, R13E, UM
Top of Productive Horizon:
3360' SNL, 1739' EWL, SEC. 10, T11N, R13E, UM
Total Depth:
3664' SNL, 1920' EWL, SEC. 10, T11N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 643114 y- 5970265 Zone- ASP4
TPI: x- 646146 y- 5968044 Zone- ASP4
Total Depth: x- 646334 y- 5967743 Zone- ASP4
18. Directional Survey 0 Yes IS! No
22.
CASING,
Size .'
30"
20"
13-3/8"
': :, : .:' . '0.1,,' .: I
I' WT.f?ËR,F:T;' ß.~D¡;:;, :
Stove Pipe
94# H-40
72# I 68# I 61 # N-80 I K-55 I J-55
26# L-80
55.5# I 47# N-80
]"
1 0-3/4" X 9-5/8"
23. Perforations oRen to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
26.
Date First Production:
Not on Production
Date of Test Hours Tested
Zero Other
5. Date Comp., Susp., or Aband.
10/20/2004
6. Date Spudded
09/24/1969
7. Date T. D. Reached
10/27/1969
8. KB Elevation (ft):
57.33'
9. Plug Back Depth (MD+ TVD)
10355 + 9173
10. Total Depth (MD+TVD)
10420 + 9232
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
24.
RECEIveD
DEC 9 02004
Alaska Oil & Gas Cons. Commission
1b. Well Class:Anchorage
IS! Development 0 Exploratory
0 Stratigraphic 0 Service
12. Permit to Drill Number
169~097 304-344
13. API Number
50- 029-20023-01-00
14. Well Name and Number:
J-02A
15. Field I Pool(s):
Prudhoe Bay Field I Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL028281
17. Land Use Permit:
SIZE
None
TVD
20. Thickness of Permafrost
1900' (Approx.)
1 'AMOUNT,'
" RUU~.EÔ'
, . "'FI:JElING ReCORD
DEPTH SET (MD)
PACKER SET (MD)
, ~ ".
25,' ' '" ,.."...',,'AC~Q,:FRì\~l)Re,;.C~Mer-.lT,SQUEEZè;,Ett.'
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9985' P&A wI 27.8 Bbls Cement
9916' Set Whipstock
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
GAs-McF
W ATER-BsL
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
PRODUCTION FOR OIL-BsL
TEST PERIOD -+
Flow Tubing Casing Pressure CALCULATED ......a.. OIL-BsL
Press. 24-HoUR RATE"'"
GAs-McF
W A TER-BsL
CHOKE SIZE
GAS-OIL RATIO
q~<?RAVITY-A~~ (~~RR)
27.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none",
RBDMS BFL JAN 04 1005
SCANNE[> .L\N 0 (5 2005
ORtGtiNAL
None
\.J'(
28.
)
29.
)
FORMATION TESTS
GEOLOGIC MARKERS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
9507'
8414'
None
Shublik
9542'
8445'
Ivishak
9617'
8512'
RECEIVED
DEC 3 0 2004
Ab~ska Oil & Gas Cons. Comm. . .
Anchorage d., ~ J$s,on
30. List of Attachments: Summary of Pre Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~IIÎ""; IJ ~I au" T'tl
Terrie Hubble VJ V ~ - ,., J..J(JV '"'<-. - I e Technical Assistant
J-02A 169-097 304-344
Well Number Permit No. I Approval No.
INSTRUCTIONS
Date I ~ ~9 loy
Prepared By Name/Number: Terrie Hubble, 564-4628
Drilling Engineer: Ken Allen, 564-4366
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
)
)
Well:
Field:
API:
Permit:
J-02B
Prudhoe Bay Unit
50-029-20023-02-00
204-184
Accept:
Spud:
Release:
Rig:
10/21/04
10/30/04
11/17/04
Nabors 2ES
PRE-RIG WORK
09/22/04
DRIFT WI 3.70" CENT, TAG XO @ 9164' SLM. EQUALIZE 2 7/8" PLUG @ 9170' SLM, COULDN'T LATCH PLUG
WI GS. RAN LIB TO 9172, (LIB SHOWS MARKS FROM FILL). RUN 5' X 2.25" P.BAILER TO 9169' SLM. POOH.
RECOVERED ABOUT 2 CUPS OF CELLO-FLAKE LOOKING MATERIAL. METAL MARKS ON BAILER.
UNSURE PLUG IS EQUALIZED. RIH WI 5' X 1.75" P. BAILER.
09/23/04
RAN SEVERAL 2.25" PUMP & 2.65" HYD. BAILER RUNS, PLASTIC COATING FILL. MADE TWO ATTEMPTS
TO LATCH PLUG WITH NO LUCK, CONTINUE BAILING WITH 2.25" P. BAILER WI 1.3" SNORKEL BOTTOM.
09/24/04
MADE SEVERAL RUNS W/2.25" X 10' P. BAILER WI SNORKEL. (SNORKEL WAS DAMAGED2X, POSSIBLY
DAMAGED PACKING MANDREL IN PLUG) RECOVERED PLASTIC COATING EACH TIME. PULLED 2 7/8"
PLUG BODY WI 2.65" HYD. BAILER, FLAT BOTTOM. SWALLOWED FISH NECK, BAILER HAD 1 GAL. FILL
(PLUG WAS NOT EQUALIZED) DRIFT WI 2.25" CENT, TEL & SAMPLE BAILER TO 10196' SLM +16' CORR,
10212' MD.
JEWELRY LOG FROM TD TO 8900'. TBG PUNCH AT 9220' - 9222', - ALL SHOTS FIRED. TBG PUNCH 9104'-
9106', ALL SHOTS FIRED. TBG PUNCH CHARGES ARE 1.56" HYPERDOME, 4 SPF.
09/25/04
JEWELRY LOG FROM 10201' TO 8900'. TBG PUNCH AT 9220' -9222', ALL SHOTS FIRED. TBG PUNCH 9104'
-9106', ALL SHOTS FIRED. STRING SHOT 9141' -9153', STRING FIRED. CHEM CUT AT 9152' WITH 3-5/8"
CHC, 3-3/8" ANCHORS. TBG PUNCH CHARGES WERE 1.56" HYPERDOME, 4 SPF. T/I/O BEFORE
OPERATION WAS 700/10010. T/I/O AFTER OPERATION WAS 7001010.
10/18/04
RAN 3.40" D-CENT & 3.75" LIB TO 9153' SLM. RAN 2 7/8" XX PLUG TO 9176' SLM. (2718 XX PLUG W/14" FILL
EXTENSION. OAL 35")
T/I/OIOOIOOOA=125/0101010 CMIT TXIA TO 3500 PSI, IN PROGRESS (RWO PREP) - PUMP 54 BBLS DIESEL
DOWN TUBING TO PRESSURE TXIA TO 3610/3500 PSI, LOST 3301340 PSI IN 15 MIN, FAILED, BETWEEN
1ST & 2ND TEST, TP & lAP STARTED TO FALL OFF FASTER (850 PSI IN 4 MIN), ESTABLISH LLR.7 BPM @
3500 PSI DOWN TUBING, SLlCKLlNE RIH TO RESET PLUG.
10/19/04
FAILED COMBO MIT. PULLED XX PLUG FROM 9176' SLM. REDRESSED AND RERAN XX PLUG TO 9176'
SLM. FAILED MIT, RAN 4 1/2 X-LOCK WI PRONG, SET @ 2016' SLM. FAILED MIT. PULLED X-LOCK BACK
OUT,@ 2014 SLM. PULLED 2.313 X LOCK OUT @ 9173' SLM.
10/20/04
PUMP 1.25" BALL THROUGH NEW CT. PERFORM WEEKLY BOP TEST. MU/RIH WI 1.75" BON BHA. PUMP
400 BBLS 1% DOWN TUBING TO KILL WELL. TAG TD @ 10213'. PUMP DIESEL DOWN TBG & IA. LAY IN
27.8 BBLS CEMENT, 1:1 RETURNS, 0 BBLS BEHIND PIPE. PT 400 PSI OVER SI WHP. POOH REPLACING
VOIDAGE. ESTIMATE TOC @ 9824'. CIRC WELL TO 1% KCL.
')
)
BP EXPLORATION
OperatiønsSummary Report
Page 1 -
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-02A
J-02A
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 16
Start: 9/16/2004
Rig Release: 11/17/2004
Rig Number:
Spud Date: 9/24/1969
End:
Date From - To Hours Task Code NPT Phase Description of Operations
---
10/18/2004 06:00 - 09:00 3.00 MOB P PRE Prepare for rig move
'09:00 - 09:30 O.SO MOB P PRE Move off well S-119 to center of pad. Pad Operator present
due to close proximity of S-108 and S-11 O.
09:30 - 10:30 1.00 MOB P PRE Install rear boosters,
10:30 - 20:00 9.S0 MOB N WAIT PRE Move rig to "V" in S Pad access road and park while waiting for
, 20:00 - 00:00 plugs to be set in J-02.
4,00 MOB P PRE Move rig down S Pad access road to junction with Spine Road.
10/19/2004 100:00 - 03:00 3.00 MOB P PRE Moving rig down Spine Road toward J Pad from S Pad Access
I Road/Spine Road junction.
I
[
103:00 - 03:30 O,SO MOB P PRE Leak of less than 1 gallon of hydraulic fluid released on Spine
¡ Road due to fitting failure. Spill Response notified. Leak
I
103:30- 10:00 cleaned up and bagged by rig crew.
6.S0 MOB P PRE Continue with rig move to J Pad. Park rig on pad. Waiting for
! J-02B to be prepared for rig operations.
; 10:00 - 00:00 14.00 MOB N WAIT PRE Remove rear booster and steam heater. Repaired off driller
! side cellar door sheave. Install new standpipe manifold,
i Change shaker screens. Service TDS, skate, iron roughneck
I and change air slips to 4" body. Inspect drawworks chains.
i Change hydraulic filters. Repair 2. Demeo valve on cement
i line.
I
¡ Coil tubing unit arrived on J-02 at 2200 hrs. Rigging up.
I
i Move camps to J Pad at 2100 hrs.
10/20/2004 100:00 - 00:00 24.00 MOB N WAIT PRE Rig and all equipment on location. Waiting for well to be
prepared for the rig to move on. Coil unit on J-02.
Rig Detail: Clean and prime gen #1. Change out valves and
seats on Mud Pump's # 1 &2. Hang cellar pump. Service
crown and tugger sheaves. Perform derrick inspection.
Change #1 shaker screens. Repaired steam leak in pump
room. Work on #2 mud pump charge pump. Working on water
softener system, Inspect, repair and adjust drag chain.
Fabricate steam lines in new pit complex. Prepare rig floor for
upcoming decompletion operations. General cleaning and
painting.
Coil Tubing Detail: Rig up. Pump 1.2S" ball through coil.
Perform weekly BOP test. MU/RIH with 1.7S" BON BHA.
Pump 400 bbls 1% down tubing to kill well. Tag TO at 10,213'.
Pump diesel down tubing and lA, Lay in 27.8 bbls cement. 1:1
returns, 0 bbls behind pipe. Pressure test 400 psi over shut in
well head pressure. POOH replacing coil displacement.
Estimate TOC at 9,824'. Circulate well to 1% KCI.
10/21/2004 00:00 - 14:00 14.00 MOB N WAIT PRE Rig and all equipment on location. Coil tubing unit on well. Coil
pumped diesel freeze protect and allowed to U-tube. Waited
for cement compressive strength to reach 1,000 psi prior to CT
performing casing pressure test. Rig performing maintenance
and repairs.
Uttle Red pressure tested casing to 2,SOO psi, good test. CT
Printed: 11/2212004 10:20:28 AM
)
)
BP EXPLORATION
Ope~atiÐF8SSUmma~y Repo~t
Page 24118
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-02A
J-02A
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 16
Start: 9/16/2004
Rig Release: 11/17/2004
Rig Number:
Spud Date: 9/24/1969
End:
Date From - To Hours Task Code NPT Phase Description of Operations
10/21/2004 100:00 - 14:00 14.00 MOB N WAIT PRE rig down and move off location.
114:00 - 22:00 8.00 MOB P PRE Lay herculite and set mats. Move over well and shim rig.
Nipple up annulus valves and rig up to circulate. Spot slop
:
¡ i tank. Berm around rig and slop tank.
¡
i Accept rig for well work on J-02B at 22:00 hours.
122:00 - 00:00 2.00 RIGU P PRE Pre-spud meeting with crews. Take on sea water.
10/22/2004 100.00 - 00.30 0.50 RIGU P PRE Hofd Pre-Spud meeting and PJSM for displacement with crew
! and truck drivers.
i 00:30 - 01 :00 0.50 RIGU P PRE Test suriace lines to 2,500 psi.
! 01 :00 - 04:00 3.00 RIGU P PRE Displace well to seawater,S bpm at 500 psi. Pump down IA
¡ taking returns from tubing directly to cuttings tank until all
¡ diesel out of tubing. Pump down tubing taking returns directly
i to cuttings tank until diesel cleared from IA. Pump 40 bbls
¡
i detergent sweep followed by 400 bbls heated seawater to clean
i up well bore.
104:00 - 05:00 1.00 RIGU P PRE Observe well on tubing and annulus sides for 30 minutes. No
flow or losses. Blow down lines.
¡ 05:00 - 08:00 3.00 RIGU P PRE Nipple down tree and adapter flange.
108:00 - 12:00 4.00 BOPSUF P DECOMP Nipple up BOP's.
¡ 12:00 - 14:00 2.00 BOPSUP P DECOMP Modify flow nipple. Connect turnbuckles and drain hoses.
114:00 - 14:30 0.50 BOPSUF P DECOMP Test BOP/well head connection to 2,500 psi and record on
t chart. Good test.. Rig up control line spooler.
j 14:30 - 15:30 1.00 BOPSUP P DECOMP Nipple up flow nipple and flow lines.
115:30-19:00 3.50 PULL P DECOMP Rig up and make up 3.947" 00 grapples on spear assy.
Attempt to engage tubing. Spear assy would not enter
crossover on hanger. Lay down spear assy. Make up 3.885"
00 grapples on spear assy. RIH and engage grapples in
tubing, Pull hanger (140K up weight) free and pull to rig floor.
LD fishing assy and hanger.
Note: There was no control line on hanger. It was investigated
and found that the completion string has a "K" valve nipple,
thus control lines were never installed.
19:00 - 21 :30 2.50 PULL P DECOMP Lay down 50 joints 4.5". 12,6# tubing. Lay down K Valve
landing nipple.
21 :30 - 22:00 0.50 PULL P DECOMP Rig down control line spooler. Rig up to run storm packer.
22:00 - 23:00 1.00 RIGU P PRE Make up storm packer, run in hole and set at 65'. Test from
above with 250 psi. Lay down packer running assy.
Note: Approximately 70,000# buoyed weight of tubing hanging
below packer.
23:00 - 00:00 1.00 BOPSUP P PRE Drain stack and nipple down BOP and tubing spool.
10/23/2004 00:00 - 01 :00 1,00 BOPSUR P DECOMP Continue Nipple Down BOP.
01 :00 - 02:30 1,50 WHSUR P DECOMP Remove existing tubing spool. Change out primary packing
seals (12 x 7),
02:30 - 04:00 1.50 WHSUR P DECOMP Install new tubing spool. Set BOP down on spool for weight.
Fill packing void with plastic and test same to 3,500 psi for 10
minutes. Good test.
04:00 - 06:00 2.00 BOPSUP P DECOMP Nipple up BOP, flow nipple and flow lines.
06:00 - 10:30 4.50 BOPSUR P DECOMP Rig up and test BOP's to 250 psi low and 3,500 psi high. Hold
all tests for 5 minutes and record on circular chart. Rig down
test equipment. pull test plug, set wear bushing and blow down
Printed: 11/2212004 10:20:28 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
)
)
Page 3 ~
BP EXPLORATION
OperationsSum.maryReport
J-02A
J-02A
REENTER+COMPLETE
DOYON DRILLING INC,
DOYON 16
From - To Hours Task Code NPT
10/23/2004 06:00 - 10:30
10:30 - 11 :30
11 :30 - 12:30
12:30 - 13:00
13:00 - 19:30
19:30 - 20:00
20:00 - 22:00
22:00 - 00:00
10/24/2004 00:00 - 06:00
06:00 - 06:30
06:30 - 07:00
07:00 - 07:30
07:30 - 11 :30
11 :30 - 13:30
13:30 - 14:30
14:30 - 17:30
17:30 - 18:00
18:00 - 21:30
21 :30 - 23:00
23:00 - 00:00
10/25/2004 00:00 - 02:30
02:30 - 03:00
03:00 - 03:30
03:30 - 08:30
08:30 - 12:30
12:30 - 15:00
15:00 - 16:00
16:00 - 17:30
17:30 -18:30
18:30 - 19:30
19:30 - 22:30
22:30 - 00:00
4.50 BOPSUP P
I
i
¡ i
1.00: DHB ¡P
¡ ¡
¡ I
1.00i WHSURP
0.501 WHSUR P
6.50, PULL P
i
ì
0.50! PULL P
2.00 i PULL P
2.00 ¡ PULL P
:
6.00; PULL P
0.50 ¡ PULL P
0.50iPULL P
0.50 i PULL
4.00 i PULL
2.00! PULL
!
1.00! PULL
3.00 ¡ PULL
0.50 i PULL
3.50! PULL
1.50 ¡ PULL
P
P
P
¡p
I:
P
P
1.00 PULL P
2.50 PULL P
0.50 PULL P
0.50 PULL P
5.00 PULL P
4.00 PULL P
2.50 PULL P
1.00 PULL P
1.50 CLEAN P
1,00 CLEAN P
1,00 CLEAN P
3.00 CLEAN P
1.50 CLEAN P
Start: 9/16/2004
Rig Release: 11/17/2004
Rig Number:
Spud Date: 9/24/1969
End:
Description of Operations
---.-.--
DECOMP choke manifold.
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECaMP
DECOMP
Note: Witness of BOP test waived by Chuck Scheve, AOGCC
Rep.
Pick up two joints of drill pipe, engage and release storm
packer.
Circulate bottoms up.
POOH and lay down storm packer. Rig up to pull 4.5" tubing.
Lay down 175 joints 4.5", 12.6# tubing, K-Valve, and 19.84' cut
off joint. Calculated top of stub in hole at 9,060.98',
Rig down tubing equipment. Clean rig rloor.
PJSM. Make up overshot BHA.
RIH picking up drill pipe singles from pipe shed. At midnight,
50 joints PU, depth 2,010',
Continue picking up drill pipe singles from pipe shed and RIH
from 2,010' to 8,817' with overshot BHA.
Service rig and TDS
Continue to PU drill pipe and RIH to 9,110'. Wash to 9,157'
(TOF).
Engage fish.
Blow down TDS. POOH from 9,157' to BHA.
POOH with BHA. Lay down recovered fish, 42.06' tubing stub
and SBA. Slick stick still in hole.
Redress and make up overshot assy and RIH to 414'.
RIH on 4" drill pipe to 9,110'.
Wash from 9,110 to 9,182'. Engage fish and release K anchor.
Flow check the well, OK. Blow down TDS. POOH with fishing
assy to BHA
POOH with BHA. Fish completely recovered. Lay down same.
Break out and lay down fishing assy.
Make up packer mills and retrieving tool assy and RIH with
same.
RIH with packer milling BHA to 8,561'.
Service rig and TDS
RIH and engaged packer at 9,204'.
Milling packer from 9204' to 9205.5'. Verify packer free.
175K UP 160K DN 155K RT 5K WOB 5K-6K TaRO 193
GPM 600 psi
POOH to BHA
Rack back collars, LD fishing BHA. Retrieved 139.28' fish
(Packer and tailpipe assembly). Bottom packer slips and half
of the bottom cone not retrieved.
Clean and clear rig floor, Make up junk mill BHA.
RIH with junk mill BHA to 3,279'.
Slip and cut drill line.
RIH picking up drill pipe singles from pipe shed from 3,279' to
3,729'. Picked up a total of 24 joints to allow reaching 9,985'.
RIH from 3,729' to 9,706'. Wash from 9,706' to 9,835',
Mill junk and dress cement from 9,835 to 9,908'
178K UP 156K ON 168K RT
268 GPM 900 PSI
90 ROTARY 5K WOB 4K-5K TORO
Printed: 11/22/2004 10:20:28 AM
)
)
BP EXPLORATION
Operations Summary Report
Page 4 e8Þ
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-02A
J-02A
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 16
Start: 9/16/2004
Rig Release: 11/17/2004
Rig Number:
Spud Date: 9/24/1969
End:
Date .Fröm- To Hours Task Code NPT Phase Description of Operations
---
10/26/2004 00:00 - 00:30 0.50 I CLEAN P DECOMP Continue to dress cement from 9,908' to 9,985'.
00:30 - 01 :30 1.00 I CLEAN P DECOMP Pump hi vis sweep surface to surface to clean hole.
01 :30 - 02:00 0.50 I CLEAN P DECOMP POH 2 stands and run back in hole to bottom to verify hole
2.50 ¡ CLEAN clean. Tagged bottom at 9,985', no fill or debris noted.
02:00 - 04:30 P DECOMP POH from 9,985' to 4,048'.
04:30 - 05:00 0.50, CLEAN P DECOMP Service rig and TDS.
05:00 - 06:30 1 .50 CLEAN P DECOMP Continue POH from 4,048' to BHA.
06:30 - 07:00 0.50 CLEAN P DECOMP - Stand back DC's & UD Baker tools.
07:00 - 08:00 1.00 CLEAN P DECOMP - Clear & clean rig floor.
08:00 - 08:30 0.50 CASE P DECOMP - RlU 51/2" casing equip't.
08:30 - 10:00 1.50 I CASE P DECOMP - PJSM - M/U 51/2" 17# 521 Hydril shoe track & Bakerlock 1st
2 jts.
10:00 - 10:30 0.50 CASE P DECOMP - Repair leak on casing fill up line.
10:30 - 13:00 2.50 CASE P DECOMP - Continue RIH wl5 1/2" 17# 521 Hydril. Ran 20 jts total & 1
1 x-over jt from 5 1/2" 521 Hydril Pin x 5 1/2" BTC B.
I - MIU liner hanger I packer.
13:00 - 13:30 0.50 I CASE P I DECOMP - Circulate 1 liner volume @ 3 BPM 170 psi.
- P/U wt 55K, S/O wt 57K.
13:30 - 20:00 6.50 I CASE P DECOMP - Run 5 1/2" liner on 4. DP & tag bottom @ 9985'.
20:00 - 20:30 0.50 CASE P DECOMP - UD DP single & MIU TO head & pup jts.
20:30 - 22:30 2.00 CASE P DECOMP - Circulate liner & DP volume x 1.5 @ 1 to 3 BPM.
I - Packing off while reciprocating pipe - Stop reciprocation &
finish circulation @
¡ 2.3 BPM 330 psi.
22:30 - 23:00 0.50 CEMT P DECOMP - Pump 5 bbls fresh water & test lines to 4000 psi.
¡ - Pump 32 bbls 15.8 ppg Class G cement @ 2 - 2.5 BPM, 200 -
300 psi.
23:00 - 23:45 0.75 CEMT P DECOMP - Close valve on TO head & wash up cement line. Open valve
& release wiper dart.
- Turn over to rig pump & displace cement wI 115.8 bbls S/W
@ 2.5 - 3 BPM. P/U hanger 3' off bottom to 9982' after cement
tumed corner. Bump plug & pressure up to 3500 psi.
- CIP @ 23:45 hrs.
23:45 - 00:00 0.25 CEMT P DECOMP - S/O 30K to ensure liner hanger set. Bleed off pressure &
check floats. Floats holding.
10/27/2004 00:00 - 00:30 0.50 CASE P DECOMP - Rotate DP 15 turns & pressure up to 800 psi. P/U string &
unsting running tool from hanger.
- S/O 35K & set packer. Good indication of shear.
- P/U string to clear running tool from packer & CBU x 1.25 @
8 - 11 BPM, 2500 - 3100 psi.
- Approximately 4 bbls cement back to surface on B/U.
00:30 - 01 :00 0.50 CEMT P DECOMP - RID cement head.
01 :00 - 01 :30 0,50 CEMT P DECOMP - CBU @ 10 BPM, 2070 psi, 100 RPM & reciprocating.
- BID TO.
01 :30 - 05:00 3,50 CEMT P DECOMP - Monitor well - static,
- POH from 9107'. Dog sub sheared,
05:00 - 05:30 0.50 CEMT P DECOMP - P/U plug dropping head & break out pup jt. LD same,
05:30 - 06:00 0.50 CEMT P DECOMP - Lubricate rig.
06:00 - 08:30 2.50 CLEAN P DECOMP - MIU & RIH wI clean-out BHA. 4 3/4" mill, bit sub, 6 DC's, jars,
x-over, 24 jts 2 7/8" DP & 2 x-overs.
08:30 - 12:30 4.00 CLEAN P DECOMP - RIH & tag landing collar on depth @ 9935'.
12:30 - 13:30 1.00 CLEAN P DECOMP - CBU @ 4 BPM 650 psi.
13:30 - 14:00 0.50 CLEAN P DECOMP - Test 7" x 5 1/2" casing to 3500 psi for 30 min.
Printed: 11/22/2004 10:20:28 AM
)
)
BP EXPLORATION
Operations Summary Rep.ort
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-02A
J-02A
REENTER+COMPLETE
DOYON DRILLING INC,
DOYON 16
Date
From-'To Hotlrs Task Code N PT Phase
-----
10/27/2004 14:00 - 16:00 2.00 CLEAN P
16:00 - 17:00 1.00 CLEAN P
17:00 . 18:00 1.00 CLEAN P
18:00 . 20:00 2.00 STWHIP P
20:00 . 23:30 3,50 STWHIP P
23:30 - 00:00 0,50 STWHIP P
10/28/2004 00:00 - 05:00 5.00 STWHIPP
05:00 - 06:00 1.00 STWHIP N
06:00 . 09:30 3.50 STWHIP N
09:30 . 12:30 3.00 STWHIP N
12:30 - 14:00 1.50 STWHIP N
14:00 - 16:00 2.00 STWHIP N
16:00 - 17:30 1.50 STWHIP N
17:30 - 19:30 2.00 STWHIP N
19:30 - 20:00
20:00 - 00:00
10/29/2004 00:00 - 01 :00
0.50 STWHIP N
4.00 STWHIP N
1.00 STWHIP N
01 :00 - 01 :30
01 :30 - 03:00
0.50 STWHIP P
1.50 STWHIP N
03:00 . 04:00
04:00 - 04:30
1.00 STWHIP P
0.50 STWHIP P
04:30 . 09:30
5.00 STWHIP P
09:30 - 10:30
10:30 - 11:00
11 :00 - 14:00
1.00 STWHIP P
0.50 STWHIP P
3.00 STWHIP P
DECOMP
IDECOMP
DECOMP
i DECOMP
!WEXIT
I
I
iWEXIT
\WEXIT
I
i
I
DPRB IWEXIT
i
DPRB I WEXIT
i
DPRB ¡ WEXIT
DPRB I WEXIT
DPRB iWEXIT
I
I
DPRB ! WEXIT
DPRB IWEXIT
I
¡
DPRB I WEXIT
DPRB WEXIT
DPRB WEXIT
WEXIT
DPRB WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
Page 5 of 14
Start: 9/16/2004
Rig Release: 11/17/2004
Rig Number:
Spud Date: 9/24/1969
End:
Description of Operations
. POH from 9935' to 4208'.
. RIH w/4 3/4" DC stands - POH & UD.
- POH from 4208' to 1526'.
- POH & UD BHA & 18 jts 4" DP.
- M/U whipstock BHA - scribe & orientto MWD.
. P/U 11 x 2 7/8" DC's & RIH w/6 stands 2 7/8" DP.
. Shallow test MWD - BID TO.
. RIH wI whipstock to 1200'
- RIH wI whipstock from 1200' to 9920'.
- Fill pipe and break circ at 4000'.
. Cont RIH to 9920'. Attempt to break circulation wlo success.
Pressure up to 2500 psi & bleed off several times in attempt to
unplug string.
. POH to 5 1/2" liner top & attempt to unplug string by applying
pressure & bleeding off wlo success.
- POH from 9050' to 5296' attempting to unplug drill string
every 1000' wlo success.
- Drop ball & open up circ sub - continue POH to BHA @ 1003'.
- UD 2 7/8" DP & 3 1/2" DC's.
- Break down & clean out BHA. BHA plugged wI fine metallic
scale from bumper sub to mills.
- Recovered approx 6 gal of scale from BHA.
- M/U whipstock assy.
. P/U 27/8" DP & 3 1/2" DC's & RIH.
- Empty active pits containing SIW. (pits 2 & 4) Clean suction
pit. Suction pit was clean wI no material in bottom that
resembled material that was found in drill string. Fill pits wi
clean SIW.
. Shallow test MWD.
- RIH to 6734' & break circ every 10 stands.
- RIH wI whipstock from 6734' to 8654' breaking circ every
1000'.
. Lubricate rig & service TD.
- RIH wI whipstock from 8654' to 9916'.
- Orient whipstock @ 51/2" liner top.
. Wash down whipstock throughout 51/2" liner @ 2 BPM 550
psi.
- P/U wt 185K, S/O wt 145K wlo pump @ 9916'.
- Attempt to get tool face from MWD. Out of sync wi SIW.
. Set whipstock anchor w/15K & shear mill set screw wi 25K.
- Set whipstock 36 deg LHS.
- Mill window through 5 1/2" & 9 5/8" casing @ 190 GPM 1980
psi, 80 - 100 RPM, Tq 8. 10K, Wt on mill 1 .5K.
- TOW @ 9916', BOW @ 9928'.
- Drill 20' new hole from middle of window to 9942'.
- P/U wt 185K, S/O wt 145K, Rot wt 167K.
. CBU wI SIW @ 190 GPM, 1980 psi, 100 RPM,
- PJSM for displacement.
- Pump SIW followed by 245 bbl used flo-pro sweep & displace
well to new 8.4 ppg flc-pro drilling fluid. Pump @ 190 GPM,
1980 - 2250 psi.
Printed: 11/22/2004 10:20:28 AM
)
)
BP EXPLORATION
Operations Summary Report
Page 6"
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-02A
J-02A
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 16
Start: 9/16/2004
Rig Release: 11/17/2004
Rig Number:
Spud Date: 9/24/1969
End:
Date From - To Hours Task Code NPT Phase Description of Operations
---.----...-
10/29/2004 14:00 - 15:00 1.00 STWHIP P WEXIT - Conduct FIT to 9.8 ppg EMW - 600 psi surface pressure.
15:00 - 16:30 1.50 STWHIP P WEXIT - Open circ sub & circulate hole clean @ 11 BPM 1400 psi.
- BID TO, choke & kill lines.
16:30 - 21 :00 4.50 STWHIP P ¡WEXIT POH & rack back 4" & 2 7/8" DP.
I
121 :00 - 22:30 1.50 STWHIP P !WEXIT - UD BHA - Starter mill & lower string mill 1/4" out of gauge,
IWEXIT upper string mill full gauge.
22:30 - 00:00 1.50 STWHIP P - R/U & flush stack - function all rams - RID.
I - BID TO, choke & kill lines.
10/30/2004 00:00 - 00:30 0.50 STWHIP P WEXIT - R/U handling equip't for BHA.
00:30 - 02:00 1,50 STWHIP P WEXIT M/U 4 3/4" drilling BHA.
02:00 - 03:00 1.00 STWHIP P WEXIT RIH w/6 stands 2 7/8" DP from derrick - shallow hole test
MWD @ 160 GPM 850 psi.
03:00 - 04:00 1.00 STWHIP P WEXIT P/U 24 jts 2 7/8" DP from pipeshed & RJH to 1525'.
04:00 - 08:30 4.50 STWHIP P WEXIT C/O to 4" handling equip't & RIH wI 4" DP to 8234' filling every
[WEXIT stands to 5100' & filling every 10 stands after 5100'.
08:30 - 09:30 1.00 STWHIP P - C/O saver sub.
09:30 - 1 0:00 0.50 STWHIP P WEXIT ,- Service TO
10:00 - 11 :00 1.00 STWHIP P jWEXIT ! - Cut & slip 95' of drilling line.
11 :00 - 12:30 1.50 STWHIP P WEXIT t - RIH from 8234' to 9730'.
12:30 - 14:00 1.50 STWHIP P ¡WEXIT ! - Mad pass from 9730' to 9942' @ 2.8 BPM 940 psi.
14:00 - 14:30 0.50 STWHIP P ¡WEXIT I - Establish baseline ECD @ 9.01 ppg.
14:30 - 16:00 1.50 DRILL P I PROD1 : - Drill directional in 4 3/4" hole from 9942' to 9962'. 100% slid.
16:00 - 17:00 1.00 DRILL N SFAL PROD1 : - Attempt to get survey. MWD signal lost.
I ¡ - Regain MWD signal.
I
17:00 - 19:30 2.50 DRILL P ! PROD1 : - Drill directional in 4 3/4" hole from 9962' to 100
: slide.
19:30 - 22:00 2.50 DRILL N SFAL PROD1 ¡ - Attempt to get survey - MWD signal 10 . Adjust pump rates &
! reduce pump pulsation dampener ssures in attempt to get
¡ surveys,
: - Regain MWD signal.
22:00 - 00:00 2.00 DRILL P PROD1 ! - Drill directional in 4 3
¡slide.
¡ - WOB 5 - 10 60 GPM 1480psi, P/U wt 165K, S/O wt 150K.
10/31/2004 00:00 - 00:30 0.50 DRILL P PROD1 1- AST 3.6 s
¡ - Drill rectional in 4 3/4" hole from 10059' to 10074'. 100%
Is' e.
I
00:30 - 01 :30 1.00 DRILL N - CBU @ 160 GPM 1420 psi.
- Due to lack of cement behind 9 5/8" casing, original wellbore
1 was tracked. Will not be able to hit target wI current 1.69 deg
¡ bent housing motor. Discuss options wI Anchorage Geologist &
I Drilling Engineer. Decision made to POH for 2.38 deg bent
, housing motor.
01 :30 - 07:00 DPRB PROD1 1- POH to change out motor. Note additional hour on time for
I change to daylight savings.
06:00 - 07:00 N DPRB PROD1 1- UD jars, DC's, motor, & bit.
07:00 - 08:30 N DPRB PROD1 1- P/U BHA - 4 3/4" XR15DPS bit, mud motor wI 2.38 deg bent
I housing, float sub, XO, PWD, XO, MWD collar, flow sub, XO, 3
NM flex collars, Circ sub. XO, jars & XO.
1.50 DRILL N DPRB PROD1 - RIH w/2 7/8" DP.
- Shallow hole test MWD @ 190 GPM 1070 psi.
5.50 DRILL N DPRB PROD1 - RIH wi BHA to 10074' on 4" DP filling every 25 stands.
- Lose & regain MWD signal.
Printed: 11122J2004 10:20:28 AM
¡¿,q ,..0'17
~o 4 - !A4-
J-O2B
Pre-Ria Operations to date (10/20/04):
1. Bleed OOA, OA, IA and tubing pressures to zero. Test the 7" and Tubing pack-offs, Function
all lOS, repair or replace as necessary. IiZI Done 09/01/04. PPPOT - T passed to 5000 psi,
PPPOT - IC failed. All LDS cycled okay.
2. MIT the OA to 2000 psi. CMIT IA and Tubing to 3500 psi for 30 minutes. IiZI Done 09/20/04.
CMIT T x IA passed to 3500 psi. MIT OA passed to 1000 psi with N2 on 9/19/04 and
passed with crude to 500 psi on 9/20/04.
3. RU Slick-line. Drift the tubing with gauge rig / junk basket to the 4-1/2" x 3-1/2" crossover at
9186', POOH. Pull XX plug from the X profile at 9187', POOH.1iZI Done 09/2V04.
4. RU E-line. RIH with Gamma Ray I CCl tool and tag top of fish - 10217', log from fish up to X
nipple at 9187' to tie into jewelry log. This log will be used to optimize the KOP (avoid cutting
a collar and verify TCGl). Perform tubing punch in 2-7/8" pup joint of tubing just below the x
nipple located at 9253'. This places the holes about 9256'. This hole will alleviate some of the
possible gas trapped behind the tail pipe during milling operations with the rig. IiZI GR/CCL
log performed on 9/24/04. The tubing punch was performed at the wrong depth... To
shallow. Shots performed at 9220' - 9222'.
5. RU Slick-line. Set a plug in the x nipple at 9253' Oust above the previous tubing punch). This
plug will act as a barrier for Nabors 2ES while r!.9..ging up. It will also act as a bottom to aid
circulating out the gas and freeze protection job. blI NOT DONE because tubing punch was
shot too shallow. Shots performed at 9220' - 9222'.
6. RU E-line. RIH and perform tubing punch (above packer), POOH. RIH and perform string
shot at - 9165', POOH. RIH and chemical cut the 4-1/2" tubing in the middle of joint #1 -
9165' Oust below sliding sleeve and just above the 4-1/2" x 3-1/2" crossover). IiZI Done
09/25/04. Tubing cut @ 9152'.
7. Circulate the well to seawater. Freeze protect the IA and tubing with diesel to - 2200'. IiZI
Done 09/25/04. Freeze protection performed by bullheading down IA and T.
8. Bleed all pressures to zero. 'SêrBPV. Secure,well.,1iZI NOT DONE. The BPVcouJd not be
- ,
9. RU SI,ick. Set a plug below th,~ chemical C"ut":in,,,,"the X nip lite, at 9187'(The same profile that
previously tested to 3500 psi on 5/31/03:t;I,A:d 9120/04):, ¡¡z) Done 09120104. Slick ,line was
successful at getting through the cutt~þing, but tlieplug FAILED to hold'35OQpsl;'At
3500 psi there was a %bpm leak rate ,..comed. A second plug was run, bat, it. to did nOt
"'old pressure.
10. RU coil, tubing. ',CømCjlrJt P&AJ-O2A ,with, coil, tubing from PBTD,',{10217') to:: -9,900'
(shallqwest perfOråtíår1;':Î$10QO71 RU and RIH:laying 30,bbls ofcement:from,PBTD to
-9,900', Squeeze ..."' bP~'in~o pedorettions.' Do 'l1plwash or dress TOG, to avoid the possibility
of getting ceme.i1t behin(f,thepab~~~,j~nd tubing~1tcut.;Jf 'the perforations 'will' not take any
cement the 30bbl jobWit~'::plåCe ~he:'TOC -9,8QO!;':9;8PO'" is the 'shallowest we want,the
cement topto~id in sidetraçkcjperations,'Cement,Cålci.Jlåtions include the, following (total job
volume is 30bqls): 23 bbls ferg-5/8n'casing and7 bblš #>fsqueeze,.
H.lt necessary, level the pad.
/'
Planned Ria Operations that have changed:
1. MI,RU Doyon 16
2. Test cement plug, to ,2500 psi.
3. Ci.rculateout freeze pr9t~,c:tion and djs~!ace well~o¡Sea Water.
4. Monitor QA, IA ahdTf()t.p)¡essure. Veiif9,well isdê~.
5. Nipple down tree. l'r,,ppi~:up;,t30PE.
6. Pull and lay down,thehafi9êf'a~d3'joints of 4-1/2P'tubing,from pre-rig cut at'~ 9165',. (Haveå
spear on locatìon¡as,:å ,,:'CQrififíger'Ícy since ,the threads; have a good, chance öf,~being
damaged).
7., Makeup remaining tubing ,to a 7~ RTTS w/SSCV, RIH and hang off at about 50'. Test BOPE.
8:' Pull and lay down RTTS~ Pull an,d lay down the remaining 4-1 i2n tubing.
:-;CANNED OCT 2. .1 2004
~
~
~lf~lfŒ (ill~ ~~~~~~
AI ~A S IiA. OIL AlQ) GAS
CONSERVATION COMMISSION
I
September 13, 2004
FRANK H. MURKOWSKI, GOVERNOR
333 W. 1'" AVENUE. SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Bill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519
Re:
PBU J-02A
304-344
Dear Mr. Isaacson:
Enclosed is the approved Application for Sundry Approval relating to the above-
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this decision,
or such further time as the Commission grants for good cause shown, a person
affected by it may file with the Commission an application for rehearing. A
request for rehearing is considered timely if it is received by 4:30 PM on the 23rd
day following the date of this letter, or the next working day if the 23rd day falls
on a holiday or weekend. A person may not appeal a Commission decision to
Superior Court unless rehearing has ~!:~
Chairman
Enc!.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
~
~
VJ(¡ft- ., [O 12°oq
ø~ '7//¡) /1-
1. Type of Request:
III Abandon [] Repair Well II Plug Perforations [] Stimulate [] Other
[] Alter Casing [] Pull Tubing [] Perforate New Pool [] Waiver [] TIme Extension
[] Change Approved Program [] Operation Shutdown [] Perforate [] Re-Enter Suspended Well
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
7. KB Elevation (ft): 57.33'
4. Current Well Class:
/
B Development D Exploratory
D Stratigraphic D Service
5. Permit To Drill Number
,< 169-097 ..;::
6. API Number:
50-029-20023-01-00 /'
9. Well Name and Number:
./
J-O2A
11.' '.
Total Depth MD (ft):
10420
Casing
ADL 028281
. ' .PRËŠ
Total Depth TVD (ft): Effective Depth MD (ft):
9232 10355
, I Annth Size.
70' 30"
931' 20"
4589' 13-3/8"
ME
70'
931'
4589'
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
," '
Effective Depth TVD (ft): Plugs (measured): Junk (measured):
9173 9187 10217
TVD Burst ' Co/laese
70'
931'
4348'
1530
3090
520
1540
8. Property Designation:
10410'
10-3/4" x 9-5/8"
10410'
9223'
6870
4760
Liner
Tieback Liner
9296'
7"
9296'
8226
7240
5410
Perforation Depth MD (ft): I Perforation Depth TVD (ft): I
10180' - 10200' 9015' - 9033'
Packers and SSSV Type: 7" x 3-1/2" Baker '3-H' packer;
4-1/2" Otis SSSV Nipple
Tubing Size:
4-112", 12.6# x 2-7/8',8.5#
Tubing Grade: I Tubing MD (ft):
L-80 9350'
Packers and SSSV MD (ft): 9211'
2028'
12. Attachments:
B Description Summary of Proposal
D Detailed Operations Program
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Bill Isaacson Title Senior Drilling Engineer
Signature r J.k~ I A.o--- Phone 564-5521 Date ~/rfO""
ComMissiOn U..Ontv <
D BOP Sketch
13. Well Class after proposed work:
D Exploratory B Development D Service
September 13, 2004
Date:
15. Well Status after proposed work:
DOil DGas
D WAG D GINJ
/
B Abandoned
D WDSPL
D Plugged
DWINJ
Contact Ken Allen, 564-4366
Prepared By Name/Numbe~
Terrie Hubble, 564-4628
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number: ~4 '.)<.Jt.f
D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance ß
Aerr1/V'~ d k7r'nA-. 10 ~ 40 l I-<j u.¡ .vi:J~¡;I~¡¿ IUP.I/ j-a ~ ' . tit d
Other: ßO P E,- te~+ ve.Ó~~ ¡¿~ 'Ç~~1l ;tUYl'^1 '^f-ef,,-k~~ Ol-fPW
lMÅð~N +-tv{ ~ t ö - 40 ~. l 3 P "92004
"'b""em F~-i 1J"'Z.(.0 1. AIUkt Oil" Q".Cen.. ColM1ission
Approved II ....J ~ COMMIS=': ~~~".i~I:~ION
Form 10-403 ~d 06~ - ~
ORfGfNAL
Date '!J ï 3 /Oe¡ t/
$ubmn In Duplicate
RBDMS BF L
SEP 1 6 ?OO~
~
~
Obp
G~ JJa6r AT
To:
Winton Aubert - AOGCC
Date:
September 03, 2004
From:
Ken Allen - BPXA GPB Rotary Drilling
J-O2A Application for Sundry Approval - P&A for Sidetrack Operations
Subject:
Approval is requested for the proposed P&A of PBU well J-O2A. This conventional well is currently shut-in
due failing a TIFl and a subsequent caliper showing significant corrosion in the upper part of the tubing.
The wellbore is providing no production or value to the field as it currently sits. Prior to being shut in for /'
leaky tubing, J-O2A was making 900 BOPD (3%WC) at a 33,000 GOR with a cumulative production of
22.4 MMBO.
J-02A is a conventional well located in the southeast portion of the J Pad gravity drainage area. Originally
named Put River 31-10-16, J-02 was later renamed J-O2A and completed with perforations in both Zone 1
and Zone 2. Initial production peaked at 13.000 BOPD in early 1978. Prior to field startup, collapsed pipe
was found in both the 9 5/8" and 13 3/8" strings. Collapsed pipe in both strings was fished and repaired
with Baash Ross casing patches. In July of 1982 a rig workover was neéded to replace leaking
Thermocase. leaks were found in the 9 5/8" casing during RWO operations, and repaired by running and /
cementing a 7" scab liner.
The J-02B horizontal well bore will target Zone 1 B. The play type is Zone 1 B gravity drainage and the
reservoir target is stacked fluvial and deltaic sands. The well will be drilled in Zone 1 B just above the
MHO/HOT to maximize standoff from the GOC. Also, the 14N shale or other lower permeability silts and
shales at the top of TZ1 B may help to shield the well from early high GOR production. It is anticipated that ,./
the Zone 2 oil pad in the area will be produced from a Zone 1 B completion as seen in several analog wells
in the area. The well bore path is oriented in a West to East direction. The single string sidetrack will exit
the J-O2A well bore at the top of Zone 2. The well will build to horizontal and stay 5 to 10 feet above the
MHO/HOT until TD at about 11975' MD. A fully cemented solid liner will be run.
The J-02B sidetrack is currently scheduled for Nabors 2ES beginning around 09/21/04, after completing
the 15-26B sidetrack. The pre-rig work for this sidetrack will be priority scheduled immediately after the
Application for Sundry is approved.
Scope
Pre-Ria Ooerations:
a. Bleed OOA, OA, IA and tubing pressures to zero. Test the 7" and Tubing pack-offs. Function all lDS.
repair or replace as necessary.
b. MIT the OA to 2000 psi. CMIT IA and Tubing to 3500 psi for 30 minutes.
c. RU Slick-line. Drift the tubing with gauge ring / junk basket to the 4-1/2" x 3-1/2" crossover at 9186',
POOH. Pull XX plug from X profile at 9187', POOH.
d. RU E-line. RIH with Gamma Ray 1 CCl tool and tag top of fish - 10217'. log from fish up to X nipple at
9187' to tie into jewelry log. This data will be used to optimize the KOP (avoid cutting collar and verify
BCGl). RIH and perform a tubing punch in the first joint of 2-7/8" tubing just below the packer millout
extension -9225'. This will minimize gas when packer milling commences with the rig. RIH and
perform tubing punch, POOH. RIH string shot at - 9165', POOH. RIH and chemical cut the 4-1/2"
J-O2A Application for Sundry
~
~
tubing in the middle of joint #1 - 9165' Oust below sliding sleeve and just above the 4-1/2" x 3-1/2"
crossover).
e. Circulate the well to seawater. Freeze protect the IA and tubing with diesel to - 2200'.
f. Bleed all pressures to zero. Set BPV. Secure well.
g. Remove the wellhouse. If necessary, level the pad.
Ria ODerations:
1. MIRU Nabors 7ES
2. Pull BPV. Circulate out freeze protection and displace well to Sea Water.
3. Monitor OA, IA and T for pressure. Verify well is dead.
4. Set TWC. Nipple down tree. Nipple up and test BOPE. Pull TWC.
5. Pull 4-1/2" tubing from pre-rig cut at - 9165'. (Have a spear on location as a contingency).
6. PU overshot assy. RIH picking up 4" DP. Washover tubing stub and rotate latch assy free, POOH.
NOTE: If SBR rotates free a second trip to retrieve the latch assy. will be required.
7. PU packer mill and PRT assy. RIH, engage PRT and mill until packer releases as per Baker
representative, POOH with packer and 2-7/8" tailpipe assy.
8. PU 6-1/8" mill assembly on DP. RIH to drift the 7" 26# liner and verify PBTD inside the 9-5/8" casing.
Note: If loses are present a LCM pill will need to be pumped and squeezed, while on bottom, to help
guarantee a good cement job between the 5-112" and 9-518" casing.
9. Run and cement a 5-1/2" 17# liner from the previously found PBTD, inside 9-5/8" casing, up 150' into
the 7" tie-back to 9146'. Space out 5-1/2" liner so the collars are at similar depths as that of the 9-5/8"
collars to limit possibility of cutter either one during the window milling job. Space out insert landing
collar to limit spacing pups needed for the bottom of the whipstock. Set hanger I liner top packer as
per Baker recommended procedure and displace cement with sea water, POOH.
10. PU 5-1/2" milling assy. RIH and ta~ landing collar, pressure test wellbore to 3500 psi for 30 minutes.
POOH. l' ~~ /0 ,- 40 ~ JIJi1lVt:t.-(.
11. RIH with 5-1/2" whipstock and milling assy. to the top 01 landing collar. Add extra tubing pup joints to
the bottom of the whipstock so window is milled just below the base of Zone 3, but avoids casing
collars in both the 5-1/2" and 9-5/8" casings - 9890'. Orient and set whipstock, swap over to 8.5 ppg
mud before milling the window.
12. Mill a window through both the 5-1/2" and 9-5/8" casings at -9890' plus 20' from mid window. Perform
FIT to 10.0. POOH for drilling BHA.
13. MU the 4-3/4" drilling assembly with DIRlGRlRES and RIH. Kick off and drill 4-3/4" production interval
as per directional plan to an estimated TD of 11975'.
14. Run and cement a 3-1/2", 9.2#, L-80 liner throughout the 4-3/4" well bore and 150' back into the 5-1/2"
liner to 9,740' MD. Set liner top packer and displace well to clean seawater above the liner top.
15. RIH with DPC perf guns, Perf intervals to be determined from LWD logs. Plan to perforate
overbalance. POOH, LD DP and perf guns
16. Run 4-1/2", 12.6#, 13Cr-80 completion tying into the 5-1/2" scab liner top.
17. Set packer, test and record the tubing to 3500 psi and annulus to 3500 psi for 30 minutes each.
18. Set and test TWC to 1000 psi.
19. ND BOPE. NU and test the tree to 5000 psi. Pull TWC.
20. Freeze protect the well to -2200'. Set BPV and secure the well.
21. RDMO.
Post-Ria Work:
1. Install well house and flowlines.
2. MIRU slickline. Pull the ball and rod I RHC plug from 'XN' nipple below the new production packer.
3. MIRU E-line. Run RST log.
4. MIRU slickline. Install gas lift valves.
Estimated Pre-rig Start Date:
Estimated Spud Date:
09/13/04
09/21/04
Ken Allen
J-O2A Application for Sundry
Operations Drilling Engineer
564-4366
~
J-O2A Application for Sundry
~
> TREE = .
6"CrN
~
J -O2A
SAFETY~TES: 7" SCAB LNR CEMENTED & SET ON
EMERGl - Y SLIPS DURING RWO. **WELL WAS
RENAMED J-o2A WHEN IT WAS DEEPENED FROM THE
RIVER FORMATION TO THE IVISHAK. **
WB..LHEAD = McEVOY
ACTUATOR = OTIS
KB. B..EV = 57.33'
BF. B..EV = 20.0'0
KOP= 2400'
Max Angle = 39 @ 8200'
Datum MD = 10004'
DatumTVD= 8800' SS
Current
20" CSG, 94#,
N-40, 8 rd - 931'
I 7" DV COLLAR I
13-3/8" CSG, 68#, K-55, ID = 12.415" I
7" TIEBACK LNR, 26#, L-80, ID = 6.276"
9122'
I I
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I
9185'
Minimum ID = 2.313" @ 9187'
2-7/8" OTIS X NIPPLE PROFILE
9253'
9296'
12-7/8" TBG, 6.5#, L-80, .00579 bpf, ID = 2.441" I
9349'
9350'
9339'
ÆRFORA TION SUMMARY
REF LOG: BHCS ON 10/28/69
ANGLEATTOPÆRF: 27 @ 10007'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DATE
2-1/8" 4 10007 - 10022 S 06/18/91
2-1/8" 4 10037 - 10046 S 06/18/91
2-118" 4 10067 - 10082 S 06/18/91
2-1/8" 4 10094-10114 S 06/18/91
2-1/8" 4 10128 - 10165 S 06/18/91
2-1/8" 8 10175 - 10180 S 06/18/91
2-1/8" 4 10180 - 10200 0 06/26/91
2-1/8" 8 10200 - 10212 S 06/18/91
-i 13-3/8" Foe 1
-i 13-3/8" CASING PATCH I
-i 10-3/4" X 9-5/8" XO I
4-1/2" OTIS SSSV NIP, ID = 3.813"
-i 9-5/8" FCC I
-i 9-5/8" CASING PATCH I
4-1/2" BKR L SLIDING SLV, ID = 3.812"
4-1/2" X 3-1/2" XO, ID = 2.992"
7" X 3-1/2" BOT 3-H PKR
-i2-7/8" OTIS X NIP, ID = 2.313" 1
-i 9-5/8" X 7" BKR TIEBACK LNR PKR SHOE 1
-i2-7/8"WLEG, ID=2.441" 1
H ELMDTTLOGNOTAVAILABLE
10410'
I PBTD I
10355'
9-5/8" CSG, 47#, N-80, ID = 8.681" I
DATE REVBY COMMENTS DATE REV BY COMMENTS
11/06/69 ORIGINAL COMPLETION
07/06/82 LAST RWO
04/05/02 RN/CI-VTP CORRECTIONS
11/13/02 lW/tih WELL NAME CORRECTION
07/15/03 CMOnLP MAX ANGLE CORRECTION
05/07/04 ??/KAK WB..L NAME CLARIFICATION
PRUDHOE BAY UNIT
WELL: J-02A
ÆRMITNo: 1690970
API No: 50-029-20023-01
SEC9, T11N, R13E, 1080' NSL& 1245'WEL
BP Exploration (Alaska)
. TREE = .
6"CrN
r--..
J -O2A
Pre-Rig
SAFETYr"\TES: 7" SCAB LNR CEMENTED & SET ON
EMERGl ,,(SUPS DURING RWO. **WELL WAS
RENAMED J-O2A WHEN IT WAS DEEPENED FROM THE
T RIVER FORMATION TO THE IVISHAK**
WELLHEAD - McEVOY
ACTUATOR- OTIS
KB. ELEV = 57.33'
BF. ELEV = 20.0'0
KOP= 2400'
Max Angle - 39 @ 8200'
Datum MD - 10004'
DatumTVD= 8800' SS
20" eSG, 94#,
N-40, 8 rd - 931'
.
Minimum ID = 2.313" @ 9187'
2-7/8" OTIS X NIPPLE PROFILE
Est. TOe - 3254'
I 7" DV COLLAR I 4019'
-113-3/8" FCC I
-113-3/8" CASING PATCH I
-110-3/4" X 9-5/8" XO I
4-1/2" OTIS SSSV NIP, ID= 3.813"
--i 9-5/8" FOC I
-1 9-5/8" CASING PATCH I
13-3/8" CSG, 68#, K-55, ID= 12.415" I
)/ Est. TOG - 5955'
7" TIEBACK LNR, 26#, L-80, ID = 6.276"
9122'
Cut 4-1/2" Tubing -9165'
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I 9185'
I I
,
;
I
\"
9253'
9296'
12-7/8" TBG, 6.5#, L-80, .00579 bpf, ID = 2.441" I
9349'
9350'
9339'
ÆRFORATION SUMMARY
REF LOG: BHCS ON 10/28/69
ANGLEATTOPÆRF: 27@ 10007'
Note: Refer to Production DB for historical perf data
SIZE SPF INTER\! A L Opn/Sqz DATE
2-1/8" 4 10007 - 10022 S 06/18/91
2-1/8" 4 10037 - 10046 S 06/18/91
2-1/8" 4 10067 - 10082 S 06/18/91
2-1/8" 4 10094 - 10114 S 06/18/91
2-1/8" 4 10128 - 10165 S 06/18/91
2-1/8" 8 10175 - 10180 S 06/18/91
2-1/8" 4 10180-10200 0 06/26/91
2-1/8" 8 10200 - 10212 S 06/18/91
10410'
I PBTD I
10355'
9-5/8" CSG, 47#, N-80, ID = 8.681" I
DATE REVBY COMMENTS DATE REVBY COMMENTS
11/06/69 ORIGINAL COMPLETION
07/06/82 LAST RWO
04/05/02 RNICHITF CORRECTIONS
11/13/02 lW/tlh WELL NAME CORRECTION
07/15/03 CMOIìLP MAX ANGLE CORRECTION
05/07/04 ??/KAK WELL NAME CLARIFICATION
4-1/2" BKR L SLIDING SLY, ID = 3.812"
4-1/2" X 3-1/2" XO, ID = 2.992"
7" X 3-1/2" BOT 3-H PKR
-12-7/8" OTIS X NIP, ID = 2.313" I
-19-5/8" X 7" BKR TIEBACK LNR PKR SHOE I
-12-7/8" WLEG, ID = 2.441" I
1-1 ELMDTTLOGNOTAVAILABLE
-1KEVLARNYLONCENTARM 6-11/91 I
1-13 URARMS 5-12-91 I
PRUDHOE BAY UNIT
WELL: J-02A
ÆRMfT No: 1690970
API No: 50-029-20023-01
SEC9, T11N, R13E, 1080' NSL & 1245' WEL
BP Exploration (Alaska)
. TREE=""
6" CrN
W8.LHEAD - McEVOY
ACTUATOR- OTIS
KB. 8.EV - 57.33'
BF. 8.EV = 20.0'0
KOP= 2400'
Max Angle - 39 @ 8200'
Datum MD = 10004'
Datum lVD = 8800'SS
20" CSG, 94#,
N-40, 8 rd - 931'
I 7" DV COLLAR I
13-3/8" CSG, 68#,
K-55, 10 12.415" - 4589'
7" Tieback LNR, 26#,
L-80, 10 = 6.276"
Top of 5-1/2" LNR - 9146'
Insert LOG Collar PBTO -9970'
5-1/2 LNR, 17#,
L-80 -10217'
I PBTD I
10355'
J-nB
5-1/2" Liner / P&A Peri's
SAFETY~TES: 7" SCAB LNR CEMENTED & SET ON
EMERGL .. Y SLIPS DURING RWO. **WELL WAS
RENAMED J-O2A WHEN IT WAS DEEPENED FROM THE
PUT RIVER FORMATION TO THE IVISHAK. **
--i 13-3/8" FOC I
--i 13-3/8" CASING PATCH I
--i 10-3/4" X 9-5/8" XO I
4-1/2" OTIS SSSV NIP, ID = 3.813"
9296'
--i 9-5/8" X 7" BKR TIEBA CK LNR PKR SHOE I
PERFORATION SUMMARY
REF LOG: BHCS ON 10/28/69
ANGLEATTOPPERF: 27@ 10007'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/8" 4 10007 - 10022 S 06/18/91
2-1/8" 4 10037 - 10046 S 06/18/91
2-1/8" 4 10067 - 10082 S 06/18/91
2-1/8" 4 10094 - 10114 S 06/18/91
2-1/8" 4 10128 - 10165 S 06/18/91
2-1/8" 8 10175 - 10180 S 06/18/91
2-1/8" 4 10180 - 10200 0 06/26/91
2-1/8" 8 10200-10212 S 06/18/91
>~
...
11&.
-I
9-5/8" CSG, 47#, No80, ID = 8.681" H 10410' 1
DATE REVBY COMMENTS DATE REVBY COMMENTS
11/06/69 ORIGINAL COM PLETION
07/06/82 LAST RWO
04/05/02 RNICHITP CORRECTIONS
11/13/02 lW/tih W8.L NAME CORRECTION
07/15/03 CMOITLP MAX ANGLE CORRECTION
05/07/04 ??/KAK W8.L NAME CLARIFICA TION
PRUDHOE BAY UNIT
W8.L: J-02A
PERMIT No: 1690970
API No: 50-029-20023-01
SEC 9, T11 N, R13E, 1080' NSL & 1245' W8.
BP Exploration (Alaska)
,TREE=.
WaLHEAD =
,~,~" '
ACTUA TOR =
KB. ELEV =
,,~ ""
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum TVD =
J-r1B
SAFETY~TES: 7" SCAB LNR CEMENTED & SET ON
EMERGL J Y SLIPS DURING RWO. **WELL WAS
RENAMED J-02A WHEN IT WAS DEEPENED fROM THE
PUT RIVER FORMATION TO THE IVISHAK. **
Proposed Completion
)
20" CSG, 94#, ~ /'
N-40, 8 rd -931' /\
7" Tieback LNR, 26#, '1
L-80, 10 = 6.276" ~
I 7" DV COLLAR H 4019' I
13-3/8" CSG, 68#, ')
K-55, 10 12.415" - 4589'
Top of 5-1/2" LNR - 9146'
9-5/8" x 7" BKR Tieback
LNR PKR Shoe - 9296'
Top of 3-1/2" LNR - 9740'
Top of Whipstock -9890'
Tubing space out joints
Insert LNOG Collar PBTO -9970' -
5-1/2 LNR, 17#,
L-80 -10217'
I PBTD H 1 0355' ~
DATE REV BY COMMENTS
11/06/69 ORIGINAL COM PLETION
07/06/82 LAST RWO
04/05/02 RNICH/TP CORRECTIONS
11/13/02 lW/tlh WELL NAME CORRECTION
07115/03 CMOITLP MAX ANGLE CORRECTION
05/07/04 ??/KAK WELL NAME CLARIFICATION
~
X;þ
-
f~ 861' H 1>-318' FOC I
~ 918' !-i13-3/8" CASING PATCH I
, -i 2003' H 10-3/4" X 9-5/8" XO 1
i ---I 2042' H 9-5/8" FOC I
- ~ ~I 2053' H 9-5/8" CASING PATCH I
?--A2200' - HES 4-1/2" X Nipple 10 = 3.813"
- ~
~ ... Est. TOC - 3254'
....... .............. Est. TOC - 5955'
4-1/2" TBG, 12.6#, 13Cr-80, 10 = 3.958"
HES 4-1/2" X Nipple 10 = 3.813"
BKR 7" x 4-1/2" PKR
HES 4-1/2" X Nipple 10 = 3.813"
HES 4-1/2" XN Nipple 10 = 3.725"
4-1/2" WLEG
I" I 1
....
3-1/2" Solid LNR, 9.2#,
L-80,11975'
~J
-,
~
Kevlar Nylon Cent Arm 6-11/91
3 UR Arms 5-12-91 -10217'
9-5/8" CSG, 47#, N-80, ID = 8.681" H 10410' I
DA TE REV BY COMMENTS
08/25/04 kw a A"oposed Completion &
add calc. Cmt from previous
7" tieback liner
PRUDHOE BAY UNIT
WELL: J-02B
PERMIT No:
API No: 50-029-20023-xx
BP Exploration (Alaska)
gyro data
Naska Oit & Gas Co~s. Co~iss~°r~
B.P. EXPLORATION
J PAD, WELL NO. J-02
PRUDHOE BAY FIELD, ALASKA
G~ro MultishOt.ln~ide:.i~.i5. TU'B'i'NG
Survey date · 10/19/01
Job number :AK1001GCE526
gyro/data
CONTENTS
JOB NUMBER :AK1001GCE526
1. DISCUSSION , SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. INRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
gym/data
1, DISCUSSION, SURVEY CERTIFICATION SHEET
;yro/ ata
DISCUSSION
JOB NUMBER ' AK1001GCE526
Tool 066 was run in J-02 on Schlumberger's Wireline. The survey was run without any problems.
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER: AK1001GCE526
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
Checked by :-
WALTER KILEY
OPERATIONS MANAGER
gyro~iata
2. SURVEY DETAILS
gyro/data
SURVEY DETAILS
JOB NUMBER: AK1001GCE526
CLIENT:
B.P. EXPLORATION
RIG:
J PAD
LOCATION:
PRUDHOE BAY, ALASKA
WELL:
J-02
LATITUDE:
70.2900 N
LONGITUDE:
148.9000 E
SURVEY DATE:
10/19/01
SURVEY TYPE :
GYRO MULTISHOT CONTINUOUS
DEPTH REFERENCE:
ROTARY TABLE ELEVATION 57.33'
MAX. SURVEY DEPTH:
10150.0
SURVEY TIED ONTO:
SURFACE
SURVEY INTERVAL:
0 - 1O15O'
APl NUMBER
TARGET DIRECTION'
50-029-2002301
128.56 .
GRID CORRECTION:
N/A
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
TOM STODDARD
gyro/data
3. INRUN SURVEY LISTING
A Gyrodata Directional Survey
B.P.
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526
Run Date: 10/19/0i 8:48:10 AM
Surveyor: Tom Stoddard
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.290000 deg. N
Sub-sea Correction fi'om Vertica! Reference: 57.33
Azimuth Correctio:-_.:
Gyro: Bearings are Relative to Tree North
Proposed Well Direction: !28.560 deg
Vertical Section Calculated fi-om Well Head Locatmn
Closure Calculated fi'om Well Head Location
Horizontal Coordinates Calculated fi-om Local' Horizontal Reference
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH
feet deg. deg. deg./- feet feet feet feet deg.
100 ft.
0.00
0.33
0.25
0.25
0.37
0.0 0.00 0.00
100.0 0.33 179.18
200.0 0:16 227.35
300.0 0.16 123.56
400.0 0.40 190.61
0.0 -57.3 0.0
100.0 42.7 0.2
200.0 142.7 0.3
300.0 242.7 0.5
400.0 342.7 0.8
500.0 0.57 189.58
600.0 0.47 199.75
700.0 0.44 181.97
800.0 0_30 159.49
900.0 O14 310.55
0.17 500.0 442.7 1.2
0.14 600.0 542.7 1.5
0.15 700.0 642.7 1.9
0.20 800.0 742.7 2.4
0.43 900.0 842.7 2.4
1000.0 0.14 167.22
1100.0 0.12 15.27
1200.0 0.14 . 14.87
1300.0 0.16 1.16
1400.0 0.15 164.26
0.27
0.26
0.02
0.04
0.31
1500.0 0.20 53.26 0.29
1600.0 0.32 35.01 0.14
1700.0 0.22 2.73 0.18
1800.0 0.19 87.88 0.28
1900.0 0.12 280.68 0.31
2000.0 !.03 128.46
2100.0 5.2~ 131.84
2200.0 7.17 118.52
2300.0 8.63 118.66
2400.0 9.90 117.26
1.14
4.25
2.37
1.46
1.29
1000.0 942.7 2.4
1100.0 1042.7 2.5
1200.0 1142.7 2.4
1300.0 1242.7 2.3
1400.0 1342.7 2.3
1500.0 1442.7 2.4
1600.0 1542.7 2.5
1700.0 1642.7 2.3
1800.0 1742.7 2.3
1900.0 1842.7 2.4
2000.0 1942.6 3.2
2099.8 2042.5 8.7
2199.2 2141.9 19.4
2298.3 2240.9 32.9
2397.0 2339.6 48.8
0.0 0.0
0.3 179.2
0.7 188.2
0.8 185.7
1.3 181.5
2.1 184.9
3.0 187.7
3.8 188.4
4.4 186.2
4.6 186.1
4.6 186.8
4.6 186.1
4.4 185.6
4.1 185.5
4.1 185.0
411 182.5
3.8 178.2
3.4 175.2
3.2 171.7
3.2 170.5
3.9 163.0
9.0 144.3
19.5 133.3
32.9 !27.2
48.9 124.2
HORIZONTAL
COORDINATES
feet
0.00 N
0.28 S
0.66 S
0.84 S
1.26 S
2.09 S
2,98 S
3.75 S
4.37 S
4,53 S
4.58 S
4.59 S
4.37 S
4,11 S
4.10 S
4,12 S
3,79 S
3.37 S
3.17 S
3.14 S
3.68 S
7.31S
13.35 S
19.93 S
27.47 S
0.00 E
0.00 E
0.10W
0.08W
0.03 W
0.18W
0.40W
0,56W
0.48W
0.48 W
0.55W
0.49W
0.43 W
0.39W
0.36W
0.18W
0.12 E
0.28 E
0.46 E
0.52 E
1.12 E
5,25 E
14.16 E
26,23 E
40,45 E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDItOE BAY, ALASKA
Job Number: AK 1001GCE526
MEASURED I N C IJ AZIMUTI! DOGI.EG
DEPTH SEVERITY
feet deg. deg. deg./
100-fi.
A Gyrodata Directional Survey
VERTICAL SUBSEA VERTICAL
DEPTH DEPTH SECTION
feet feet feet
CLOSURE
DIST. AZIMUTH
feet deg.
IIORIZONTAL
COORDINATES
feet
2450.0 10.44 117.12
2500.0 11.48 116.76
2550.0 11.98 t 17.18
2600.0 12.86 117.38
2650.0 13.97 117.75
2700.0 14.86 117.78
2750.0 15.80 117.72
2800.0 !6.37 118.44
2850.0 17.45 119.05
2900.0 18.53 119.09
2950.0 19.66 119.50
3000.0 20.51 118.99
3050.0 21.76 119.09
3100.0 23.06 1!9.36
3150.0 24.09 119.58
3200.0 25.20 119.86
3250.0 26.77 !20.38
3300.0 28.21 120.88
3350.0 29.56 12!.33
3400.0 30.97 12i.35
3450.0 32.53 121.57
3500.0 33.08 121.36
3550.0 33.06 121.37
3600.0 32.71 121.73
1.06
2.10
1.01
t .76
2.22
1.79
1.87
1.22
2.19
2.15
2446.2 2388.8 57.4
2495.3 2437.9 66.7
2544.2 2486.9 76.7
2593.0 2535.7 87.2
2641.7 2584.3 98.6
57.7 ~23.1
67.1 122.2
77.3 121.5
88.0 121.0
99.6 120.6
2690.1 2632.8 110.8 112.0
2738.3 2681.0 123.8 125.2
2786.4 2729.0 137.5 139.1
2834.2 2776.9 151.8 153.6
2881.8 2824.4 167.0 169.0
2.28 2929.0 287117 183.2 185.4
1.75 2976.0 2918.6 200.1 202.6
2.49 3022.6 2965.3 217.9 220.6
2.61 3068.8 3011.5 236.7 239.7
2.06 3114.6 3057.3 256.4 259.7
2.23 3160.1 3102.8 277.0 280.5
3.18 3205.0 3147.7 298.7 302.4
2.90 3249.4 3192.1 321.6 325.5
2.75 3292.2 3235.8 345.5 349.6
2.82 3336.3 3279.0 370.5 374.8
3378.9 3321.5 396.6 401.1
3420.9 3363.6 423.5 428.2
3462.8 3405.5 450.6 455.5
3504.8 3447.4 477.5 482.6
3.13
1.13
0.05
0.81
120.3
120.0
119.8
119.7
119.7
119.6
119.6
119.6
119.5
119.5
119.5
119,6
119.7
119.8
119.9
120.0
120.1
120.1
120.2
31.50 S
35.81S
40.42 S
45.35 S
50.72 S
56.52 S
62.67 S
69.19 S
76,19 S
83.69 S
91.70 S
100.09 S
108.84 S
118.15 S
127.99 S
138.33 S
149.32 S
161.08 S
173.56 S
186.67 S
200.40 S
214.54 S
228.74 S
242.95 S
48.31E
56.78 E
65.84 E
75,40 E
85.69 E
96.70 E
108.40 E
120.62 E
133.37 E
146.87 E
161.13 E
176.11E
191.87 E
208.51E
225.92 E
244.03 E
262.97 E
282.83 E
303.51E
325.03 E
347.48 E
370.58 E
393.88 E
417.01E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK1001GCE526
MEASURED I bl C L AZIMUTH DOGLEG
DEPTH SEVERITY
feet deg. deg. deg./
100 fi.
3650.0 32.55 121.55
A Gyrodata Directional Survey
3700.0 31.44 122.00
3750.0 30.80 !21.15
3800.0 29.99 121.21
3850.0 30.03 121.19
3900.0 30.29 120.78
VERTICAL SUBSEA VERTICAL
DEPTH DEPTH SECTION
feet feet feet
3950.0 30.26 121.39
4000.0 30.68 121.19
4050.0 3093 121.14
410o.0 31.40 121.44
4150.0 31.69 121.55
0.37 3546.9 3489.6
4200.0 31.84 121.45
4250.0 32.06 121.64
4300.0 32.311 122.04
4350.0 32.52 122.11
4400.0 32.68 121.82
2.27
1.54
1.62
O.08
0.53
4450.0 32.41 118.66
4500.0 31.64 116.34
4550.0 31.45 116.50
4600.0 31.05 115.60
4650.0 31.i7 115.99
0.63
0.88
0.50
1.00
0.58
47(10.0 32.10 115.84
4750.0 33.23 115.92
4800.0 34.16 116.16
0.32
0.49
0.63
0.44
0.44
3.44
2.90
0.42
1.23
0.47
504.3
CLOSURE
DIST. AZIMUTH
feet deg.
3589.3 3532.0 530.6
3632.1 3574.8 556.2
3675.2 3617.9 581.3
3718.5 3661.2 606.1
3761.8 3704.4 631.0
5O9.6 120.3
536.1 120.4
561.9 120.4
587.2 120.5
612.2 120.5
637.3 120.5
3805.0 3747.6 656.0 662.4
3848.1 3790.7 681.1 687.8
3891.0 3833.7 706.5 713.4
3933.8 3876.5 732.2 739.3
3976.4 3919.1 758.1 765.4
4018.9 3961.6 784.3 791.8
4061.3 4004.0 810.5 818.2
4103.7 4046.3 837.11 844.8
4145.9 4088.5 863.6 871.6
4188.0 4130.7 890.4 898.6
4230.1 4172.8- 917.0 925.5
4272.5 4215.2 943.0 951.9
4315.1 4257.8 968.6 978.0
4357.9 4300.6 993.9 1003.9
4400.7 4343.4 1019.1 1029.6
1.86 4443.3 4385.9
2.28 4485.4 4428.0
1.87 4527.0 4469.6
1044.7
1071.0
1098.1
1055.8
1082.7
1110.3
120.5
120.6
120.6
120.6
120.6
120.7
120.7
120.7
120.8
120.8
120.8
120.7
120.6
120.5
120.4
120.2
120.1
120.0
HORIZONTAL
COORDINATES
feet
257.09 S
271.04 S
284.57 S
297.67 S
310.62 S
323.54 S
336.53 S
349.70 S
362.95 S
376.39 S
39O.O6 S
403.81S
417.66 S
431.71S
445.94 S
460.20 S
473.74 S
485.99 S
497.63 S
509.02 S
520.26 S
531.72 S
543.50 S
555.68 S
439.96 E
462.49 E
484.50 E
506.15 E
527.54 E
549.04 E
570.60 E
592.27 1£
614.18 E
636.29 E
658.60 E
681.04 E
703.60 E
726.22 E
748.93 E
771.78 E
795.01E
818.52 E
841.94 E
865.24 E
888.5O E
912.09 E
936.37 E
961.29 E
Well: J-02, 4.5"/2.875" ~
Location: J PAD, PRUDIIOE BAY, ALASKA
Job Number: AK 1001GCE526
MEASURED I N C I. AZIMUTH DOGLEG
DEPTII SEVERITY
feet deg. deg. deg./
100 fl.
4850.0 33.95 116.98
4900.0 33.80 i 17.25
A Gyrodata Directional Survey
4950.0 33.77 I 17.38
5000.0 34.19 117.37
5050.0 34 29 118.05
5100.0 33.94 117.89
5150.0 33.85 I i 8.72
5200.0 33.62 119.36
5250.0 33.85 118.96
5300.0 34.10 119.68
5350.0 34.50 !19.53
5400.0 34.44 119.90
VERTICAL SUBSEA VERTICAL
1) EPTI 1 1) EP'F! 1 SECTION
feet feet feet
1.02 4568.4 4511.1 1125.5
0.42 4609.9 4552.6 1152.8
5450.0 34 24 1i9.45
5500.0 33.81 !19.89
5550.0 33.59 120.23
5600.0 33.09 120.41
5650.0 33 04 120.11
t}.15
0.84
0.79
0.73
0.94
5700.0 32.98 120.82
5750.0 32.75 121.24
5800.0 32.74 121.41
5850.0 31.66 120.32
5900.0 31.26 i21.69
O.64
0.94
O.82
0.43
5950.0 31.48 121.60
6000.0 31.85 121.88
0.64
1.00
0.57
1.03
0.34
0.78
0.64
0.18
2.45
1.64
4651.5 4594.1 1180.0
4692.9 4635.6 1207.5
4734.3 4676.9 1235.1
4775.7 4718_3 1262.6
4817.2 4759.8 1290.1
CLOSURE
DIST. AZIMUTII
feet deg.
4858.7 4801.4 1317.5
4900.3 4843.0 1344.9
4941.8 4884.5 1372.4
4983.1 4925_8 1400.3
5024.3 4967.0 1428.2
5065.6 5008.3 1456.1
5107.0 5049.7 1483.7
5148.6 5091.3 1511.2
5190.4 5133.1 1538.4
5232.3 5175.0 1565.4
1138.3 119.9
1166.1 119.9
1193.9 119.8
1221.8 119.8
1249.9 119.7
1278.0 119.7
1305.8 119.6
1333.6 119.6
1361.4 119.6
1389.3 119.6
1417.5 119.6
1445.8 119.6
1474.0 119.6
1502.0 119.6
1529.7 119.6
1557.2 119.6
1584.5 119.7
5274.2 5216.9 1592.3 1611.7
5316.2 5258.9 1619.2 1638.8
5358.3 5301.0 1646.1 1665.9
5400.6 5343.3 1672.5 1692.5
5443.2 5385.9 1698.3 1718.6
0.45 5485.9 5428.6 1724.2 1744.6
0.79 5528.5 5471.2 1750.2 1770.8
119.7
119.7
119.7
119.7
119.8
119.8
119.8
HORIZONTAL
COORDINATES
feet
568.21S
580.91S
593.67 S
606.52 S
619.60 S
632.75 S
645.97 S
659.45 S
672.98 S
686.67 S
700.59 S
714.62 S
728.58 S
742.43 S
756.33 S
770.20 S
783.94 S
797.75 S
811.73 S
825.80 S
839.47 S
852.91 S
866.56 S
880.37 S
986.33 E
1011.14 E
1035.84 E
1060.66 E
1085.56 E
1110.33 E
1134.88 E
i159.15 E
1183.40 E
1207.76 E
1232.26 E
1256.84 E
1281.35 E
1305.66 E
1329.67 E
1353.39 E
1376.95 E
1400.42 E
1423.67 E
1446.78 E
1469.65 E
1492.01E
1514.17 E
1536.50 E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526
MEASURED I N C L AZIMUTH DOGLEG
DEPTH SEVERITY
feet deg. deg. deg./
100 ft.
6050.0 32.46 120.93
6100.0 32.48 !21.80
6150.0 32.25 121.31
1.58
0.93
0.69
6200.0 32.57 121.44
6250.0 '32.94 121.98
6300.0 33.23 122.82
6350.0 34.23 123.38
6400.0 35.14 123.87
0.64
0.94
1.10
2.10
1.89
6450.0 35.93 124.82
6500.0 36.68 124.84
6550.0 37.51 125.31
6600.0 37~79 125.36
6650.0 37.90 125.78
A Gyrodata Directional Survey
6700.0 37.58 126.29
6750.0 37.63 126.39
6800.0 37.46 126.30
6850.0 37.44 126.84
6900.0 36.94 127.37
VERTICAL SUBSEA VERTICAL
DEPTH DEPTH SECTION
feet feet feet
6950.0 36.97 127.43
7000.0 36.49 127.09
7050.0 36.17 127.68
7100.0 36 30 128.06
7150.0 36.10 127.70
7200.0 35.61 128.49
5570.8 5513.5 1776.6
5613.0 5555.7 1803.3
5655.2 5597.9 1829.8
5697.4 5640.1 1856.4
5739.5 5682.2 1883.3
5781.4 5724.1 1910.4
5823.0 5765.6 1938.1
5864'.1 5806.8 1966.4
1.94 5904.8 5847.4 1995.4
1.50 5945.1 5887.7 2024.9
1.74 5985.0 5927.6 2055.0
0.56 6024.5 5967.2 2085.5
0.55 6064.0 6006.7 2116.2
0.90
0.16
0.35
0.66
1.19
CLOSURE
DIST. AZIMUTH
feet deg.
0.10
1.06
0.94
0.52
0.58
1.35
6103.6 6046.2 2146.7
6143.2 6085.9 2177.2
6182.8 6125.5 2207.7
6222.5 6165.2 2238.0
6262.4 6205.0 2268.3
6302.3 6245.0 2298.3
6342.4 6285.f: 2328.2
6382.7 6325.3 2357.8
6423.0 6365.7 2387.4
6463.3 6406.0 2416.9
0503.9 6446.5 2446.2
1797.4 119.8
1824.3 119.9
1851.0 119.9
1877.8 119.9
1904.9 119.9
1932.1 120.0
1959.8 120.0
1988.2 120.1
2017.2 120.1
2046.7 120.2
2076.8 120.3
2107.2 120.3
2137.7 120.4
2168.2 120.5
2198.6 120.6
2228.9 120.6
2259.1 120.7
2289.2 120.8
2319.0 120.9
2348.7 121.0
2378.2 121.1
2407.5 121.1
2436.9 121.2
2465.9 121.3
HORIZONTAL
COORDINATES
feet
894.23 S
9O8.2O S
922.21S
936.17 S
950.38 S
965.01S
980.17 S
995.93 S
1012.33 S
1029.24 S
1046.57 S
1064.23 S
1082.08 S
1100.08 S
1118.16 S
1136.21S
1154.33 S
1172.56 S
1190.82 S
1208.92 S
1226.90 S
1245.04 S
1263.18 S
1281.24 S
1559.21E
1582.13 E
1604.94 E
1627.82 E
1650.83 E
1673.87 E
1697.13 E
1720.82 E
1744.82 E
1769.12 E
1793.80 E
1818.71E
1843.66 E
1868.41E
1892.98 E
1917.52 E
1941.94 E
1966.05 E
1989.93 E
2013.73 E
2037.26 E
2060.59 E
2O83.9O E
2106.95 E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AKi001GCE526
MEASURED IN C L AZIMUTH DOGLEG
DEPTH SEVERITY
feet deg. deg. deg./
100 ft.
7250.0 35.90 128.63
7300.0 35.23 128.94
7350.0 34.88 129.32
7400.0 34.34 130.25
0.61
1.38
0.83 ·
1.51
7450.0 33.50 130.95
7500.0 33.48 131.38
7550.0 33.03 132.39
7600.0 32.91 132.07
7650.0 32.45 133.20
A Gyrodata Directional Survey
7700.0 31.94 134.01
7750.0 32.33 133.99
7800.0 33.13 134_{)8
7850.0 33.60 135.04
7900.0 34.39 135.30
VERTICAL SUBSEA VERTICAL
DEPTH DEPTH SECTION
feet feet feet
7950.0 35.28 135.98
8000.0 36.26 137.06
8050.0 37.17 137.34
8100.0 38.06 137.80
8150.0 38.87 138.85
6544.4 6487.1 2475.4
6585.1 6527.8 2504.5
6626.0 6568.7 2533.2
6667.2 6609.9 2561.6
8200.0 39.33 1,38.72
8250.0 39.25 138.60
8300.0 38.79 139.28
8350.0 37.67 139.t3
8400.0 37.83 139.65
1'.86 6708.7 6651.4 2589.5
0.47 6750.4 6693.1 2617.0
1~.43 6792.2 6734.9 2644.4
0.42 6834.2 6776.8 2671.5
1~52 6876.2 6818.9 2698.5
1.35
0.79
1~61
1.40
1.60
1.94
2.33
1.86
1.87
2.07
0.93
0.21
1.26
2.24
0.70
6918.5 6861.2 2725.0
6960.9 6903.6 2751.5
7002.9 6945.6 2778.4
7044.7 6987.4 2805.7
7086.2 7028.8 2833.5
7127.2 7069.9 2861.9
7167.8 7110.4 2890.8
7207.9 7150.5 2920.4
7247.5 7190.1 2950.5
7286.6 7229.3 2981.1
7325.4 7268.1 3012.2
7364.1 7306.8 3043.3
7403.0 7345.6 3074.3
7442.2 7384.9 3104.7
7481.8 7424.4 3134.8
CLOSURE
DIST. AZIMUTH
feet deg.
2494.9 121.4
2523.8 121.5
2552.2 121.6
2580.3 121.6
2607.9 121.7
2635.1 121.8
2662.1 121.9
2688.9 122.0
2715.4 122.2
2741.5 122.3
2767.6 122.4
2794.1 122.5
2821.0 122.6
2848.3 122.7
2876.1 122.9
29O4.5 123.0
2933.5 123.1
2963.1 123.3
2993.! 123.4
3023.5 123.6
3054.1 123.7
3084.5 123.9
3114.3 124.1
3143.9 124.2
HORIZONTAL
COORDINATES
feet
1299.45 S
1317.67 S
1335.80 S
1353.97 S
1372.12 S
1390.28 S
1408.59 S
1426.87 S
1445.16 S
1463.53 S
1482.01S
1500.80 S
1520.09 S
1539.92 S
1560.34 S
1581,55 S
1603.48 S
1626.01 S
1649.24 S
1672.96 S
1696.73 S
1720.47 S
1743.89 S
1767.13 S
2129.79 E
2152.46 E
2174.74 E
2196.56 E
2217.74 E
2238.51E
2258.92 E
2279.07 E
2298.93 E
2318.22 E
2337.35 E
2356.79 E
2376.38 E
2396.O9 E
2416.05 E
2436.16 E
2456.46 E
2477.05 E
2497.73 E
2518.51E
2539.42 E
2560.10 E
2580.31E
2600.24 E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526
MEASURED I Ix! C L AZIMUTH DOGLEG
DEPTH SEVERITY
feet deg. deg. deg./
100 fi.
8450.0 37.3! 139.70
8500.0 36.69 139.76
8550.0 36.57 140.53
8600.0 36.48 139.95
8650.0 36.15 139.71
1.03
1.25
0.95
0.71
0.71
8700.0 35.03 140.16
8750.0 35.25 140.71
8800.0 34.64 141.59
8850.0 33.60 141.75
8900.0 32.99 141.92
2.30
0.76
1.58
2.09
1.24
8950.0 32.61 141.52
9000.0 32.62 142.30
9050.0 32.01 142.50
9100.0 31.48 142.65
9150.0 30.68 143.03
A Gyrodata Directional Survey
9200.0 29.95 143.57
9250.0 28~97 144.52
93110.0 28.58 145.26
9350.0 27~16 146.17
9400.0 26.93 146.97
VERTICAL SUBSEA VERTICAL
DEPTH DEPTH SECTION
feet feet feet
9450.0 26.93 147.50
9500.0 27.33 147.81
9550.0 27,32 148.14
9600.0 27.10 148~11
9650.0 26.85 148.00
7521.4 7464.1 3164.7
7561.3 7504.0 3194.2
7601.5 7544.1 3223.4
764t.6 7584.3 3252.6
7681.9 7624.6 3281.6
7722.6 7665.3 3310.2
7763.5 7706.1 3338.3
7804.5 7747.1 3366.3
7845.8 7788.5 3393.6
7887.6 7830.3 3420.3
0.86 7929.7 7872.3 3446.7
0.84 797!.8 7914.5 3472.9
1.23 8014.0 7956.7 3498.8
1.07 8056.6 7999.2 3524.4
1.66 8099.4 8042.0 3549.4
CLOSURE
DIST. AZIMUTH
feet deg.
i.56
2.17
1.06
2.96
0.86
8142.5 8085.2 3573.8
8186.1 8128.7 3597.5
8229.9 ~i72.6 3620.6
8274.1 8216.8 3642.9
8318.6 8261.3 3664.5
0.48 8363.2 8305.9 3686.0
0:84 8407.7 8350.4 3707.5
0.30 8452.1 8394.8 3729.2
0.45 8:496.6 8439.3 3750.7
0.50 8541.2 8483.8 3772.1
3173.3 124.3
3202.3 124.5
3231.0 124.6
3259.7 124.8
3288.3 124.9
3316.4 125.0
3344.2 125.2
3371.7 125.3
3398.6 125.4
3425.0 125.6
3451.0 125.7
3476.9 125.8
3502.5 125.9
3527.7 126.1
3552.4 126.2
3576.6 126.3
36O0.0 126.4
3622.8 126.5
3644.9 126.7
3666.3 126.8
3687.5 126.9
37O8.9 127.0
3730.3 127.2
3751.7 127.3
3772.9 127.4
HORIZONTAL
COORDINATES
feet
1790.37 S
1813.33 S
1836.23 S
1859.11S
1881.74 S
1904.01S
1926.19 S
1948.49 S
1970.49 S
1992.07 S
2013.33 S
2034.54 S
2055.72 S
2076.61S
2097.18 S
2117.41S
2137.32 S
2157.00 S
2176.31S
2195.28 S
2214.33 S
2233.59 S
2253.05 S
2272.46 S
2291.71S
2619.97 E
2639.42 E
2658.54 E
2677.57 E
2696.67 E
2715.40 E
2733.73 E
2751.69 E
2769.09 E
2786.05 E
2802.83 E
2819.45 E
2835.76 E
2851.75 E
2867.34 E
2882.43 E
2896.87 E
2910.71E
2923.88 E
2936.41E
2948.66 E
296O.86 E
2973.O3 E
2985.11E
2997.11E
A Gyrodata Directional Survey '
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526
MEASURED I N C L AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH
feet deg. deg. deg./ feet feet feet feet deg.
i 00 fl.
HORIZONTAL
COORDINATES
feet
9700.0 27.01 148.23 0.37 8585.7 8528.4 3793.4
9750.0 26.79 148.28 0.43 8630.3 8573.0 3814.7
9800.0 26.72 148.27 0. i 6 8675.0 86 i 7.6 3835.9
9850.0 26.78 !48.32 0.13 8719.6 8662.3 3857.1
9900.0 26.52 145.24 0.52 8764.3 8707.0 3878.2
9950.0 20.80 148.47 0.59 8809.0 8751.7 3899.3
10000.0 26.61 148.50 0.39 8853.7 8796.3 3920.5
10050.0 26.!1 !48.88 1.05 8898.5 8841.1 3941.3
10150.0 25.52 149.26 1.11
8988.4 8931.1 3982.3
3794.1 127,5
3815.2 127.6
3836.3 127.8
3857.4 !27.9
3878.4 128.0
3899.5 128.1
3920.5 128.2
3941.3 128.3
3982.3 128.6
2310,94 S
233¢).18 S
2349.32 S
2368.47 S
2387,54 S
2406.64 S
2425.80 S
2444.76 S
2482.31 S
3009.07 E
3020.97 E
3032.81E
3044.63 E
3056.43 E
3068,20 E
3079.94 E
3091.47 E
3113.92 E
Final Station Closure: Distance: 3982.25 fi Az: 128.56 deg.
9
A Gyrodata Directional Survey
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDlfOE BAY, ALASKA
Job Number: AK 1001GCE526SS
Run Date: 10/19/0! 8:48:10 AM
Surveyor: Tom Stoddard
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.290000 deg. N
Sub-sea Correction from Vertical Reference:
Azimuth Correction:
Gyro: Bearings are Relative to Tree North
57.33 fl.
Proposed Well Direction: 128.560 deg
Vertical Section Calculated fi'om Well Head Location
Closure Calculated fi'om Well llead Location
Horizontal Coordinates Calculated from Local Horizonta! Reference
:
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDI IOE BAY, ALASKA
Job Number: AK 1001GCE526SS
SUBSEA I N C L AZIMUTH
DEPTH
feet deg. deg.
DOGLEG
SEVERITY
deg./
100 ft.
-57.3 0.00 0.00
42.7 0.33 ! 79.18
142.7 0.16 227.35
242.7 0.16 123.56
342.7 0.40 190.61
0.00
0.33
0.25
0.25
0.3;7
442.7 0.57 189.58 0.1'7
542.7 0.47 199.75 0.14
642.7 0.44 18 !.97 0.15
742.7 0.30 159.49 0.20
842.7 0.14 310.55 0,43
942.7 0.14 167.22
i 042.7 0.12 15.27
1142.7 0.14 14.87
12-12.7 0.16 1.16
1342.7 0.15 164.26
1442.7 13.20 53.26
1542.7 0.32 35.01
1642.7 0.22 2.73
1742.7 0. t9 87.88
1842.7 (}. ! 2 28.:).68
! 942.6 1.03 128.46
2042.5 5.27 131.84
2141.9 7.17 118.52
2240.9 8.63 I 18.66
2339.6 9.90 117.26
0.2?
0,26
0.02
0.0,I
0.31
0.29
0.14
0.18
0.:28
0_31
i.14
4.25
2.37
1.46
1.29
A Gyrodata Directional Survey
VERTICAL VERTICAL CLOSURE
DEPTH SECTION DIST. AZIMUTIt
feet feet feet deg.
0.0 0.0 0.0 0.0
100.0 0.2 0.3 179.2
200.0 0.3 0.7 188.2
300.0 0.5 0.8 185.7
400.0 0.8 1.3 181.5
500.0 i.2 2.1 184.9
600.0 1.5 3.0 187.7
700.0 1.9 3.8 188.4
800.0 2.4 4.4 186.2
900.0 2.4 4.6 186.1
1000.0 2.4 4.6 186.8
1100.0 2.5 4.6 186.1
1200.0 2.4 4.4 185.6
1300.0 2.3 4. I 185.5
1400.0 2.3 4.1 185.0
1500.0 2.4 4.1 182.5
1600.0 2.5 3.8 178.2
1700.0 2.3 3.4 175.2
1800.0 2.3 3.2 171.7
1900.0 2.4 3.2 i 70.5
2000.0 3.2 3.9 163.0
2099.8 8.7 9.0 144.3
2!99.2 19.4 19.5 133.3
2298.3 32.9 32.9 127.2
2397.0 48.8 48.9 124.2
HORIZONTAL
COORDINATES
feet
0.00 N
0.28 S
0.66 S
0.84 S
1.26 S
2.O9 S
2.98 S
3.75 S
4.37 S
4.53 S
4.58 S
4.59 S
4.37 S
4.11 S
4.10 S
4.12 S
3.79 S
3.37 S
3.17 S
3.14 S
3.68 S
7.31 S
13.35 S
19.93 S
27.47 S
0.00 E
0.00 E
0.10W
0.08W
0.03W
0.18W
0.40W
0.56W
0.48 W
0.48W
0.55W
0.49W
0.43 W
0.39W
0.36W
O.18W
0.12 L;
0.28 E
0.46 E
0.52 F.
1.12 E
5.25 E
14.16 E
26.23 E
40.45 E
A Gyrodata Directional Survey
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526SS
SUBSEA I N C L AZIMUTH DOGLEG
DEPTH SEVERITY
feet deg. deg. deg./
100 fi.
:
2388.8 10.44 117.12
2437.9 11.48 116.76
2486.9 11.98 117.18
2535.7 12.86 117.38
2584.3 13.97 117.75
2632.8 14.86 117.78
2681.0 15.80 117.72
2729.0 16.37 118.44
2776.9 17.45 119.05
2824.4 18.53 119.09
1.06
2.10
1.01~
1.76
2.22
1.79
1,87
1.22
2.19
2.15
2871.7 19.66 119.50
2918.6 20.51 118.99
2965.3 21.76 119.09
3011.5 23 06 119.36
3057.3 24.09 1~9.58
3102.8 25.20 119.86
3147.7 26.77 120.38
3192.1 28.21 120.88
3235.8 29.56 121.33
3279.0 30.97 121.35
3321.5 32.53 121.57
3363.6 33.08 121.36
3405.5 33.06 121.37
3447.4 32.7! 121.73
2.28
1.75
2.49
2.61
2.06
2:23
3.18
2.90
2.75
2.82
-:
3.1-3
1.13
0.05
0.81
VERTICAL VERTICAL CLOSURE
DEPTH SECTION DIST. AZIMUTH
feet feet feet deg.
2446.2 57.4 57.7 123.1
2495.3 66.7 67.1 122.2
2544.2 76.7 77.3 121.5
2593.0 87.2 88.0 121.0
2641.7 98.6 99.6 120.6
2690.1 110.8 112.0 120.3
2738.3 123.8 125.2 120.0
2786.4 137.5 139.1 119.8
2834.2 151.8 153.6 119.7
2881.8 167.0 169.0 119.7
2929.0 183.2 185.4 119.6
2976.0 200.1 202.6 119.6
3022.6 2!7.9 220.6 119.6
3068.8 236.7 239.7 119.5
3114.6 256.4 259.7 119.5
3160.1 277.0 280.5 119.5
3205.0 298.7 302.4 119.6
3249.4 32!.6 325.5 119.7
3293.2 345.5 349.6 119.8
3336.3 370.5 374.8 119.9
3378.9 396.6 401.1 120.0
3420.9 423.5 428.2 120.1
3462.8 450.6 455.5 120.1
3504.8 477.5 482.6 120.2
HORIZONTAL
COORDINATES
feet
31.50 S
35.81S
40.42 S
45.35 S
50.72 S
56.52 S
62.67 S
69.19 S
76.19 S
83.69 S
91.70 S
100.09 S
108.84 S
118.15 S
127.99 S
138.33 S
149.32 S
161.08 S
173.56 S
186.67 S
200.40 S
214.54 S
228.74 S
242.95 S
48.31E
56.78 E
65.84 E
75.40 E
85.69 E
96.70 E
108.40 E
120.62 E
133.37 E
146.87 E
161.13 E
176.11E
191.87 E
208.51E
225.92 E
244.03 E
262.97 E
282.83 E
303.51E
325.03 E
347.48 E
370.58 E
393.88 E
417.01E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK1001GCE526SS
SUBSEA I N C L AZIMUTH · DOGLEG
DEPTIi SEVERITY
feet deg. deg. deg./
10ff ft.
3489.6 32.55 121.55
3532.0 3t.44 122.00
3574.8 30.80 121.15
3617.9 29.99 121.21
3661.2 30.03 121.19
3704.4 30.20 120.78
I).37
::
2.27
1.54
1.62
0108
0~53
3747.6 30.26 121.39
3790.7 30.68 121.19
3833.7 30.93 121.14
3876.5 31.40 121.44
3919.1 31.69 121.55
0163
0.88
0.50
1.00
0.58
3961.6 31.84 12!.45
4004.0 32.06 12t.64
4046.3 32.30 122.04
4088.5 32.52 122.11
4130.7 32.68 121.82
4172.8 32.41 118.66
4215.2 31.64 116.34
4257.8 31.45 116.50
4300.6 31.05 115.60
4343.4 31.17 i15.99
4385.9 32.10 115.84
4428.0 33.23 115.92
,1460.6 34.16 !16.16
0.32
O.49
0.63
0.44
0.44
3.44
2.90
0.42
1.2-3
0.47
1.86
2.28
1,87
A Gyrodata Directional Survey
VERTICAL VERTICAL CLOSURE
DEPTIt SECTION D1ST. AZIMI.JTIt
feet feet feet deg.
3546.9 504.3 509.6 120.3
3589.3 530.6 536.1 120.4
3632.1 556.2 561.9 120.4
3675.2 581.3 587.2 120.5
3718.5 606.1 612.2 120.5
3761.8 631.0 637.3 120.5
3805.0 656.0 662.4 120.5
3848.1 681.1 687.8 120.6
3891.0 706.5 713.4 120.6
3933.8 732.2 739.3 120.6
3976.4 758.1 765.4 120.6
4018.9 784.3 791.8 120.7
4061.3 810.5 818.2 120.7
4103.7 837.0 844.8 120.7
4145.9 863.6 871.6 120.8
4188.0 890.4 898.6 120.8
4230.1 917.0 925.5 120.8
4272.5 943.0 951.9 120.7
4315.1 968.6 978.0 120.6
4357.9 993.9 1003.9 120.5
4400.7 1019.1 1029.6 120.4
4443.3 1044.7 1055.8 120.2
4485.4 107i.0 1082.7 120.1
4527.0 1008.1 1110.3 120.0
HORIZONTAL
COORDINATES
feet
257.09 S
271.04 S
284.57 S
297.67 S
310.62 S
323.54 S
336.53 S
349.70 S
362.95 S
376.39 S
390.06 S
403.81S
417.66 S
431.71S
445.94 S
460.20 S
473.74 S
485.99 S
497.63 S
509.02 S
520.26 S
531.72 S
543.50 S
555,68 S
439.96 E
462.49 E
484.50 E
506.15 E
527.54 E
549.O4 E
570.60 E
592.27 E
614.18 E
636.29 E
658.60 E
681.04 E
703.60 E
726.22 E
748.93 E
771.78 E
795.01E
818.52 E
841.94 E
865.24 E
888.50 E
912.09 E
936.37 E
961,29 E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDttOE BAY, ALASKA
Job Number: AK 1001GCE526SS
SIIIISEA I N (' I, AZIMIlTIi
DEPTH
feet deg_ deg.
4511.1 33.95 116.98
4552.6 33.80 117.25
4594.1 33.77 117.38
4635.6 34.19 117.37
4676.9 34.29 118.05
4718.3 33.94 117.89
4759.8 33.85 118.72
4801.4 33.62 119.36
4843.0 33.85 118.96
4884.5 34.10 !19.68
4925.8 34.50 119.53
4967.0 34.44 119.90
SEVERITY
deg.-/
100 fi.
1.02-
0.42
0.15:
0.84.
o~79
0.73
0.94
0.84
0.64
0.94
0.82
0.43
5008.3 34.24 119.45
5049.7 33.81 119.89
5091.3 33.59 !20.23
5133.1 33.09 120.41
5175.0 33.04 120.11
5216.9 32.98 120.82
5258.9 32,75 121.24
5301.0 32.74 121.41
5343.3 31.66 i20.32
5385.9 31.26 121.69
0.64
1.00
0.57
1.03
0.34
0.'78
0.64
0.1,8
2.45
1.64
5428.6 31.48 121.60
5471.2 31,85 121.88
0.45
0.79
A Gyrodata Directional Survey
VERTICAl, VF, RTICAI, CI,OSIIRE
DEPTH SECTION DIST. AZIMUTH
feet feet feet deg.
4568.4 1125.5 1138.3 119.9
4609.9 1152.8 1166.1 ii9.9
4651.5 1180.0 1193.9 119.8
4692.9 1207.5 1221.8 119.8
4734.3 1235.1 1249.9 119.7
4775.7 1262.6 1278.0 119.7
4817.2 1290.1 1305.8 119.6
4858.7 1317.5 1333.6 119.6
4900.3 1344.9 1361.4 119.6
4941.8 1372.4 1389.3 119.6
4983.1 1400.3 1417.5 119.6
5024.3 1428.2 1445.8 119.6
5065.6 1456.1 1474.0 119.6
5107.0 1483.7 1502.0 119.6
5148.6 151t.2 1529.7 119.6
5190.4 1538.4 1557.2 119.6
5232.3 1565.4 1584.5 119.7
5274.2 1592.3 1611.7 119.7
5316.2 1~619.2 1638.8 119.7
5358.3 1646.1 1665.9 119.7
5400.6 1672.5 1692.5 119.7
5443.2 1698.3 1718.6 119.8
5485.9 1724.2 1744.6 119.8
5528.5 1750.2 1770.8 119.8
IIORIZONTAI,
COORDINATES
feet
568.21 S
580.91S
593.67 S
606.52 S
619.60 S
632.75 S
645.97 S
659.45 S
672.98 S
686.67 S
700.59 S
714.62 S
728.58 S
742.43 S
756.33 S
770.20 S
783.94 S
797.75 S
811.73 S
825.80 S
839.47 S
852.91S
866.56 S
880.37 S
986.33 E
1011.14 E
1035.84 E
1060.66 E
1085.56 E
1110.33 E
1134.88 E
1159.15 E
1183.40 E
1207.76 E
1232.26 E
1256.84 E
1281.35 E
1305.66 E
1329.67 E
1353.39 E
1376.95 E
1400.42 E
1423.67 E
1446.78 E
1469.65 E
1492.01E
1514.17 E
1536.50 E
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: AK 1001GCE526SS
SUBSEA I N C L AZIMUTH DOGLEG
DEPTH SEVERITY
feet deg. deg. deg./
100 fl.
5513.5 32.46 120.93
5555.7 32.48 121.80
5597.9 32.25 121.31
5640.1 32.57 121.44
5682.2 32.94 121.98
5724.1 33.23 122.82
5765.6 34.23 123.38
5806.8 35.14 123.87
5847.4 35.93 124.82
5887.7 36.68 124.84
5927.6 37.51 125.31
5967.2 37.79 125.36
6006.7 37.90 125.78
1.58
0.93
0.69
0:64
0.94
1.10
2.10
1.89
1.94
1.50
1.74
0.56
0.55
6046.2 37.58 126.29
6085.9 37.63 126.39
6125.5 37 46 126.30
6165.2 37.44 126.84
6205.0 36.94 127.37
6245.0 36.97 127.43
6285.0 30.49 127.09
6325.3 36.17 127.68
6365.7 36.30 12~.06
6406.0 36.10 127.70
0.90
0.16
0:35
0.66
1.1.9~
0.10
1.06
..
0.94
0.52
o158
6446.5 35.61 128.40
1.35
A Gyrodata Directional Survey
VERTICAL VERTICAL CLOSURE
DEPTH SECTION DIST. AZIMUTH
feet feet feet deg.
5570.8 1776.6 1797.4 119.8
5613.0 1803.3 1824.3 119.9
5655.2 1829.8 1851.0 119.9
5697.4 1856.4 1877.8 119.9
5739.5 1883.3 1904.9 119.9
5781.4 1910.4 1932.1 120.0
5823.0 1938.1 1959.8 120.0
5864.1 1966.4 1988.2 120.1
5904.8 1995.4 2017.2 120.1
5945.1 2024.9 2046.7 120.2
5985.0 2055.0 2076.8 120.3
6024.5 2085.5 2107.2 120.3
6064.0 2116.2 2137.7 120.4
6103.6 2146.7 2168.2 120.5
6143.2 2177.2 2198.6 120.6
6182.8 2207.7 2228.9 120.6
6222.5 2238.0 2259.1 120.7
6262.4 2268.3 2289.2 120.8
6302.3 2298.3 2319.0 120.9
6342.4 2328.2 2348.7 121.0
6382.7 2357.8 2378.2 121.1
6423.0 2387.4 2407.5 121.1
6463.3 2416.9 2436.9 121.2
6503.9 2446.2 2465.9 121.3
HORIZONTAL
COORDINATES
feet
894.23 S
908.20 S
922.21 S
936.17 S
950.38 S
965.01 S
980.17 S
995.93 S
1012.33 S
1029.24 S
1046.57 S
1064.23 S
1082.08 S
1100.08 S
1118.16 S
1136.21S
1154.33 S
1172.56 S
1190.82 S
1208,92 S
1226.90 S
1245.04 S
1263.18 S
1281.24 S '
1559.21E
1582.13 E
1604.94 E
1627.82 E
1650.83 E
1673.87 E
1697.13 E
1720.82 E
1744.82 E
1769.12 E
1793.80 E
1818.71E
1843.66 E
1868.41E
1892.98 E
1917.52 E
1941.94 E
1966.05 E
1989.93 E
2013.73 E
2037.26 E
2060.59 E
2O83.90 E
2106.95 E
B.P.
Well: J-02, 4.5"/2.875"
l,ocaiion: J PAl), PRIIDI IOli BAY, AI,ASKA
Job Number: AK 1001GCE526SS
SUBSEA I N C L AZIMUTH DOGLEG
DEPTII SEVERH'Y
feet deg. deg. deg./
100 ft.
· ,
6487.1 35.90 128.63
6527.8 35.23 128.94
6568.7 34.88 120.32
6609.9 34.34 130.25
6651.4 33.50 130.95
6693.1 33.48 131.38
6734.9 33.03 132.39
6776,8 32.91 132.07
6818.9 32.45 133.20
6861.2 31.94 134.01
6903.6 32.33 133.99
6945.6 33.13 134.08
6987.4 33.60 !35.04
7028.8 34.39 135.30
7069.9 35.28 135.98
7110.4 36.26 137.06
7150.5 37.17 137.34
7190.1 38..06 137.80
7229.3 38.87 138.85
7268.1 39.33 138.72
7306.8 39.25 138.60
7345.6 38.79 139.28
7384.9 37.67 139.13
7424.4 37.83 139,65
0.61
1.38
0.83
1.51i
!-
1.86
0.47
1.43
0.42
1.52
1.35
0.79
1.61
1.40
1.60
!.94
2.33
!.86
1.87
2.~07
0,93
0.21
1.26
2.24
0.~0
A Gyrodata Directional Survey
VERTICAL VERTICAL CLOSURE
DEPTII SEC"HON I)IST. AZIMUTI|
feet feet feet deg.
6544.4 2475.4 2494.9 121.4
6585.1 2504.5 2523.8 121.5
6626.0 2533.2 2552.2 121.6
6667.2 2561.6 2580.3 121.6
6708.7 2589.5 2607.9 121.7
6750.4 2617.0 2635.1 121.8
6792.2 2644.4 2662.1 121.9
6834.2 267i.5 2688.9 122.0
6876.2 2698.5 2715.4 122.2
6918.5 2725.0 2741.5 122.3
6960.9 2751.5 2767.6 122.4
7002,9 2778.4 2794.1 122.5
7044.7 2805.7 2821.0 122.6
7086.2 2833.5 2848.3 122.7
7127.2 2861.9 2876.1 122.9
7167.8 2890.8 2904.5 123.0
7207.9 2920.4 2933.5 123.1
7247.5 2950.5 2963.1 123.3
7286.6 2981.1 2993.1 123.4
7325.4 3012.2 3023.5 123.6
7364.1 3043.3 3054.1 123.7
7403.0 3074.3 3084.5 123.9
7442.2 3104.7 3114.3 124.1
7481.8 3134.8 3143.9 124.2
HORIZONTAL
COORDINATES
feet
1299.45 S
1317.67 S
1335.80 S
1353.97 S
1372.12 S
1390.28 S
1408.59 S
1426.87 S
1445.16 S
1463.53 S
1482.01 S
1500.80 S
1520.09 S
1539.92 S
1560.34 S
1581.55 S
1603.48 S
1626.01S
1649.24 S
1672.96 S
1696.73 S
1720.47 S
1743.89 S
1767.13 S
2129.79 E
2152.46 E
2174.74 E
2196.56 E
2217.74 E
2238.51E
2258.92 E
2279.07 E
2298.93 E
2318.22 E
2337.35 E
2356.79 E
2376.38 E
2396.09 E
2416.05 E
2436.16 E
2456.46 E
2477.05 E
2497.73 E
2518.51E
2539.42 E
2560.10 E
2580.31E
2600.24 E
Well: J-02, 4.5"/2.875"
I.ocation: J PAD, PR[IDHOE BAY, AI.ASKA
Job Number: AK 1001GCE526SS
SUBSEA I N C L AZIMUTH DOGLEG
DEPTI t SEVERITY
feet deg. deg. deg./
100 It.
7464.1 37.31 139.70 1.03
7504.0 36.69 139.76 1.25
7544.1 36.57 140.53 0.95
7584.3 36.48 139.95 0.71
7624.6 36.15 139.71 0.71
7665.3 35.03 140.16 2.30
7706.1 35.25 140.71 0.76
7747.1 34.64 141.59 1.58
7788.5 33.60 141.75 2.09
7830.3 32.99 141.92 1.24
7872.3 32.61 141.52
7914.5 32.62 142.30
7956.7 32.01 142.50
7999.2 31.48 142.65
8042.0 30 68 143.03
8085.2 29.95 143.57
8128.7 28.97 144.52
8172.6 28.58 145.26
8216.8 27.16 146.17
8261.3 26.93 146.97
8305.9 26.93 147.50
8350.4 27.33 147.81
8394.8 27.32 148.14
8,139.3 27.10 1,18.11
8483.8 26.85 148.00
0.86
0.84
1.23
1.07
1.66
1.56
2.17
1~06
2.96
0~8~
0.4:8'
O.84
0.30
{}.45
0.50
A Gyrodata Directional Survey
VERTICAL VERT,~CAL CLOSURE
DEPTH SECTION DIST. AZIMUTIt
feet feet feet deg.
7521.4 3164.7 3173.3 124.3
7561.3 3194.2 3202.3 124.5
7601.5 3223.4 3231.0 124.6
7641.6 3252.6 3259.7 124.8
7681.9 3281.6 3288.3 124.9
7722.6 33!0.2 3316.4 125.0
7763.5 3338.3 3344.2 125.2
7804.5 3366.3 3371.7 125.3
7845.8 3393.6 3398.6 125.4
7887.6 3420.3 3425.0 125.6
7929.7 3446.7 3451.0 125.7
7971.8 3472.9 3476.9 125.8
8014.0 3498.8 3502.5 125.9
8056.6 3524.4 3527.7 126.1
8099.4 3549.4 3552.4 126.2
8142.5 3573.8 3576.6 126.3
8186.1 3597.5 3600.0 126.4
8229.9 3620.6 3622.8 126.5
8274.1 3642.9 3644.9 126.7
8318.6 3664.5 3666.3 126.8
8363.2 3680.0 3687.5 126.9
8407.7 3707.5 3708.9 127.0
8452.1 3729.2 3730.3 127.2
8496.0 375{).7 3751.7 127.3
8541.2 3772.1 3772.9 127.4
HORIZONTAL
COORDINATES
feet
1790.37 S
1813.33 S
1836.23 S
1859.11S
1881.74 S
1904.01S
1926.19 S
1948.49 S
1970.49 S
1992.07 S
2013.33 S
2034.54 S
2055.72 S
2076.61S
2097.18 S
2117.41S
2137.32 S
2157.00 S
2176.31S
2195.28 S
2214.33 S
2233.59 S
2253.05 S
2272.46 S
2291.71S
2619.97 E
2639.42 E
2658.54 E
2677.57 E
2696.67 E
2715.40 E
2733.73 E
2751.69 E
2769.09 E
2786.05 E
28O2.83 E
2819.45 E
2835.76 E
2851.75 E
2867.34 E
2882.43 E
2896.87 E
2910.71E
2923.88 E
2936.41E
2948.66
2960.86
2973.03
2985.11
2997.11
Well: J-02, 4.5"/2.875"
Location: J PAD, PRUDHOE BAY, ALASKA
Job Number: A K 1001GCE526SS
SULtSEA t N C L AZIM1JTII
DEPTH
feet deg. deg.
DOGLISG
:SEVERITY
deg./
100 fi.
A Gyrodala Directional Survcy
VERTICAl. VERTICAL CI~OSURE
DEPTH SECTION DIST. AZIMUTH
feet feet feet deg.
I IORIZONTA !.
COORDINATES
feet
8528.4 27.01 148.23
8573.0 26.79 !48.28
8617.6 26.72 148.27
8662.3 26.78 !48.32
8707.0 26.52 148.24
8751.7 26.80 148.47
8796.3 26.6! 148.50
8841.1 26.1! 148.88
8886.0 26.07 149.20
8931.1 25.52 149.26
0.37
0.43
0.16
0.13
0.52
0.59
0.39
1.05
0.29
1.11
8585.7 3793.4 3794.1 127.5
8630.3 3814.7 3815.2 127.6
8675.0 3835.9 3836.3 127.8
8719.6 3857.1 3857.4 127.9
8764.3 3878.2 3878.4 128.0
8809.0 3899.3 3899.5 128.1
8853.7 3920.5 3920.5 128.2
8898.5 3941.3 3941.3 128.3
8943.4 3961.9 3961.9 128.4
8988.4 3982.3 3982.3 128.6
2310.94 S
2330.18 S
2349.32 S
2368.47 S
2387.54 S
2406.64 S
2425.80 S
2444.76 S
2463.62 S
2482.31S
30O9.O7 E
3O2O.97 E
3032.81E
3044.63 E
3056.43 E
3O68.20 E
3079.94 E
3091.47 E
3102.79 E
3113.92 E
Final Station Closure: Distance: 3982.25 fl Az: 128.56 deg.
~/data
4. QUALITY CONTROL
gyro/data
QUALITY CONTROL REPORT
JOB NUMBER: AK1001GCE526
TOOL NUMBER:
066
MAXIMUM GYRO TEMPERATURE:
83.24 C
MAXIMUM AMBIENT TEMPERATURE:
67.17 C
MAXIMUM INCLINATION:
39.58
AVERAGE AZIMUTH:
128.63
WIRELINE REZERO VALUE:
11'ADD OUTRUN
REZERO ERROR / K:
N/A
CALIBRATION USED FOR FIELD SURVEY:
4179
CALIBRATION USED FOR FINAL SURVEY:
4179
PRE JOB MASS BALANCE OFFSET CHECK:
-.42
POST JOB MASS BALANCE OFFSET CHECK~ ·
-.18
CONDITION OF SHOCK WATCHES
UPON ARRIVAL AT RIG:
UPON COMPLETION OF SURVEY:
UPON RETURN TO ATLAS
BOTTOM LINE COMPARISIONS
OK
M.D. INC AZIMUTH -I'VD NORTHING EASTING
OLD SURVEY 10100 26.25 151.00 8898.11 2341 S 3253 E
FINAL SURVEY 10100 26.07 149.20 8943.4 2463 S 3102 E
gyro/data
FUNCTION TEST
JOB NUMBER: AK1001GCE526
5 Survey stations were collected at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
2400 9.94 9.94 9.94 9.94 9.94
AZIMUTH
M.D. ft 1 2 3 4 5
2400 117.88 117.97 117.89 117.97 118'.01
gyro(data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
gyn data
EQUIPMENT REPORT
JOB NUMBER: AK1001GCE526
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 066
GYRO SECTION A0285
DATA SECTION C0159
POWER SECTION C0197
BACKUP
TOOL No. 402
GYRO SECTION A0102
DATA SECTION C0207
POWER SECTION C0211
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0693
A0107
A0029
A0143
A0
A0085
A0166
WIRELINE COMPANY:
CABLE SIZE:
SCHLUMBERGER
7/32"
RUNNING GEAR
-.
TOTAL LENGTH OF TOOL:
MAXIMUM O.D.:
TOTAL WEIGHT OF TOOL:
29'
1.80"
260 POUNDS
gyro/data
CHRONOLOGICAL REPORT
JOB NUMBER: AK1001GCE526
THURSDAY, 10/18/01
l 1:00 TO SLOPE, ALASKA AIR
12:45 ARRIVE SLOPE
20:00 CHECK TOOLS, JOB TOMORROW A.M.
FRIDAY, 10/1
07:00
08:00
09:00
09:30
12:00
13:30
14:30
18:00
9/01
TO LOCATION
ARRIVE LOCATION
MU TOOL, RU WERELiNE, PRESSURE TEST LUBRICATOR
START INRUN SURVEY
AT 10150', START OUTRUN SURVEY
LD TOOL, RD WIRELINE
RETURN DEADHORSE
CHECK. TOOL, PROCESS SURVEY
SATURDAY, 10/20/01
06:30 SUBMIT RESULTS
10:00 CHECK WITH 9ES ON POSSIBLE JOB, CANCELED
13:30 TO ANCHORAGE
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Julie Heusser,
Commissioner
DATE:
November 12, 2000
THRU:
Blair Wondzell, j;~~
P. I. Supervisor ~ {'[(,Ceo
FROM: John Cnsp, J e~,., ~o SUBJECT:
Petroleum Inspector
Safety Valve Tests
Prudhoe Bay Unit
J Pad
November 12, 2000: I traveled to BP's Prudhoe Bay Field J Pad to witness
Safety Valve System tests,
Safety Valve tests had been ~elaye_d for 2 days due to blowing snow Phase 3
weather conditions. I met with BP rep. Merv Littlelow & discusse~l SVS tests on J
Pad. Merv & I decided that we could safely test valves as soon as Roads & Pads
could clean a path to well houses & skid 52. Well houses had fair amount of
snow inside the houses due to the extended blow. Testing was conducted in as
safe & efficient manner as conditions would allow. The AOGCC test report is
attached for reference.
SUMMARY: I witnessed SVS tests on PBU J Pad.
8 wells, 16 components tested. No failures witnessed.
8 Well houses inspected.
Attachments' SVS PBU J Pad 11-12-00jc
cc;
NON-CONFIDENTIAL
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Littlelow
AOGCC Rep: John Crisp
Submitted By: John Crisp Date:
Field/Unit/Pad: Prudhoe Bay Field J Pad
Separator psi: LPS 149 HPS
11/12/00
687
Well Permit Separ Set L~ Test Test Test Date
Oil, WAG, G~J,
Number Number PSI PSI TAp Code Code Code Passed GAS or CYCLE
1-01A 1941110 687 550 540~ P P OIL
J-02A ~,~,,,~ ~ 687 550 550 P P OIL
J-03 "~904'50
J-06 177O2O0
J-07A 1960870
J-08 1770470
J-09A 1940990
J-10 1800160
J-11A 1961040
J-12 18O017O
J-13 1800830
J-14 1830750
J-15A 1981750
J-16 1830880
J-17A 1990920 149 125 125 P P OIL
J-18 1831080 687' 550 525 P P · OIL
J-19 1861350
J-20A 1961060
J-21 1870240
J-22 1870170
J-23 1870310
J-24 1870020
J-25 1870680
J-26 1870590
J-27 1870580 687 550 550' P P OIL
J-28 1870410 687 550: 525 P P OIL
JX-02A 1941540 149 125! 125 P P OIL
J-05B 2000180 687 550~ 400 P P OIL
Wells: 8 Components: 16 Failures: 0 Failure Rate: 0.0% [] 90 my
Remarks:
11/16/00 Page 1 of 2 SVS PBU J Pad 11-12-00j¢.xls
BP EXPLORATION (Alaska), Inc.
To.'
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
November 20, 1998
Attention: David Johnston, Chairman
Subject: Well Name Change Request
In order to facilitate efficient data sharing between BP Exploration (Alaska), Inc. and Arco Alaska Inc., we are
requesting formal well name changes to the following wells:
Well Name as permitted
on 401
Permit Number
APl Number
New Well Name
Requested
PUT RIV J-2 69-43 500292002300 J-02
PBU J-02RD ~
500292002301 J-02A
PBU TERM-C 78-102 500292035600 TW-C
PBU TERM-A 79-81 500292040600 TW-A
PBU 14-9R 81-189 500292053401 14-09
PBUTR T-3C 81-12 500292055500 T-03C "~
PBU JX-2 85-234 500292145500 JX-02
CC-2A 90-26 500292201600 CC-02A
Thank you for your attention regarding this matter.
Sincerely,
Thomas R. Bundy
PBU ReSource Management Computing Coordinator
CC:
AOGCC - Bob Crandall
AOGCC - Steve McMains
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 8 December 1993
RE: Transmittal of Data
ECC #: 4993.01
Data: PDK-PORO
Dear Sir/Madam,
Reference:
BP
J-02 ~
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes:
Sent by U.S. MAIL
(~ PDK LDWG TAPE+LISTER
Run # 1
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Date:
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 1 December 1993
RE: Transmittal of Data
ECC #: 4993.01
Data: PDK-PORO
Dear Sir/Madam,
Reference: BP
J-02 ~
~~ PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Prints/Films: 1
1
Sent by U.S. MAIL
PDK/GR RF FNL. SEPIA
PDK/GR FINAL BLUE
Run # 1
Run # 1
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Date:
BP EXPLORATION
..
·
,,
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 04/01/93
T# 84417
BP/PBU CH LOGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
PRODUCTION LOG 03/24/93 #1
PFC 03/30/93 #1
PRODUCTION LOG 03/25/93 #1
PRODUCTION LOG 03/21/93 #1
PRODUCTION LOG 03/29/93 #1
PERF 03/25/93 #1
PRODUCTION LOG 03/23/93 #1
PRODUCTION LOG 03/26/93 #1
PRODUCTION LOG 03/22/93 #1
PRODUCTION LOG 03/22/93 #1
PDK-IOO/GR 03/27/93 #1
Information Control
Well Records
11000.00-11400.00
9350.00- 9595.00
9900.00-10190.00
12050.00-12460.00
9950,00-10300.00
9500.00- 9782.00
9100.00- 9590.00
9750.'00-10080.00
9000.00- 9680.00
9000.00- 9680.00
11 550.00-12000.00
ATLAS 5"
ATLAS 5"
ATLAS 5"
ATLAS 5"
,~,TLA S 5"
ATLAS 5"
ATLAS 5"
ATLAS 5"
ATLAS 5"
ATLAS 5"
ATLAS 5"
RECEIVED
APR 0 5 1993
Nask;, 011 & Gas Cons. Commission
Anchorage
/
/
.... ,(A OIL AND GAS CONSERVATION COMMI N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ' Stimulate X' Plugging Perforate ×
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface "
1080'SNL, 1245' WEL, SEC. 09, T11N, R13E, UPM
At top of productive interval
2068' NSL, 1886' EWL, SEC. 10, T11N, R13E, UPM
At effective depth
1882'NSL, 2022'EWL, SEC. 10, T11N, R13E, UPM
At total depth
1759' NSL, 2072' EWL, SEC. 10, T11N, R13E, UPM
Repair well.
5. Type of Well:
Development .~
Exploratory
Straligraphic
Service
12. Present well condition summary
Total depth: measured
true vertical
10420feet
BKB 9213feet
Plugs (measured)
NAt.
Other
.
6. Datum elevation (DF or KB)
KBE = 57.33 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J-02 (23-10-11-13) PBU
9. Permit number/approval number
69-97/
10. APl number
50- 029-20023-01
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured
true vertical
10210feet
BKB 9036feet
Junk (measured) fill at 10210'MD (06/89)
Casing Length Size
Structural --
Conductor 70 30
S u dace 911 20
Intermediate 4569 13 3/8
Production 10357 10 3/4
Liner 9163 7
Perforation depth: measured 10160'- 10165', 10175'- 10209'
Cemented Measured depth True vertical depth
BKB
175 sx 90 90
2000 sx 931 931
3150 sx 4589 4332
2095 sx 10410 9203
535 sx 9216 8137
true vertical subsea
8934'- 8978' (two intervals)
Sqzd: 10007;10022', 100.37; 10046', 10067; 10082',
10094;10114; 10128;10160; 10209;10212'
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9186'; 3 1/2" EUE 9186'-9211' with 2 7/8" tailpipe to 9350'
Packers and SSSV (type and measured depth) 7" BOTpacker at 9211'; 4 1/2" K-valve at 2028'
13. Stimulation or cement squeeze summary see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
RECEIV
s EP 2 5 3992
Alaska Oil & Gas Cons. Corn
Anchorage
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing PreSsure
Prior to well operation
Subsequent to operation
1270 /.~ 9500 0 0 2192
4070 10900 20 0 408
15. AttaChments ......... 16. Status of Well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations .24, Oil X Gas Suspended
17. I hereby c,ertify that the foreg,,oing is true and correct to the best of my knowledge.
Signed ~'/,/V~. Title Senior Technical Assistant I
Form 10-404 i~ev 06/15/88
Service
Date
SUBMIT IN DI~PLIC~TE
W~LL .I-02 (23-10-11-13}
NRWO/HCL/Renerf
06/18/91 A NRWO was performed using the following fluids below:
310 bbls PW(s) to Cool Well 5 bbls EW(Preflush)
24 bbls EDTA 18 bbls Cement
22 bbls EW (Spacer)
25 bbls DUO Polymer(Contaminant)
8 bbls PW(Displacement) 236 bbls PW(Reverse Out)
35 bbls PW(Jet Pass) 51 bbls PW(Final Reverse Out)
40 bbls Recovered(N2 Displacement)
Well Cleaned Out to 10210'
5 bbls Load fluid behind pipe
17.5 bbls cement recovered
Cement: 15.5 ppg class g cement containing, .20% CFR-3,
.21% HR-12, .16 GAL/SK Halad-344L
0 6/2 6 / 9 1 The following intervals below was reperforated
using 2 1/8" gun diameter, 4 SPF, 0 degree orientation
and 0 degree phasing.
10180' - 10200' MD
06/29/9 1 A HCL Acid Treatment was performed using the following
fluids below:
Down Tubing(Directly): 14 bbls SW to fluid pack
tubing(filtered), 25 bbls FILT SW during Acid Job, 3J9
bbls pumped.
Down Coil(Into tubing/perfs): 10 bbls diesel with
MU-SOL, 25 bbls 12%HCL with Additives, 7 bbls FILT SW
with Surfactant, Acidized perforations from 9180'-9200'
with 12% HCL.
7/19/92
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
/?
BP CASED HOLE FINALS
DATE: 01/03/92
T# 83152
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
!.~1 M-26 ~ / GAS LIFT SURVEY 12/08/91 fl
'[-9~. Y-34 ~ PITS 12/07/91 fl
i--Iq'1 ~2'I"~ ~/..-~ PROD-F 12/07/91 fl
I~'~ B~~ / INJ 12/09/91 fl
~'~, R-06 ~' INJ 12/04/91 fl
~-)6, D-08 ~'v CCL 12/08/91 fl
~-I'~l'~ ~'/ J INJ 12/06/91 fl
GAS LIFT SURVEY 12/07/91 fl
~,-'~$ B-13 z~ CCL 12/09/91 fl
~'-,t~ ~-'~~j TEMP 12/08/91 #1
I-i~;' X-18 vy'j PROD-F 11/08/91 fl
~-z~z-32 ~// ~ ~/05/~ ~
~.;~ P-15 .~v PROD-F 11/09/91 ~1
f'~& N-213 ~ CL 11/06/91 ~1
%~" S-03V~ TEHP 12/06/91 ~1
,-~g W-16~ /' PROD-F 11/21/91 fl
t-~ Y-31~~ GAS LIFT SURVEY 11/24/91 fl
~-~Y-15~ GAS LIFT SURVEY 11/24/91 fl
5 "
~-'O°z-20/~ ~s ENTRY
5 "
GAS ENTRY
~ 5 ee
2000.00-11539.00 CAMCO 2/5"
9450.00- 9710.00 CAMCO 5 "
9150.00- 9520.00 CAMCO 5 "
10586.00-10935.00 CAMCO 5 "
9800.00-10080.00 CAMCO 5 "
8758.00-10259.00 CAMCO 5 "
9350.00- 9850.00 CAMCO 5 "
100.00- 9130.00 CAMCO 2 " ·
10500.00-10867.00 CAMCO 5 "
12850.00-13445.00 CAMCO 5 "
10000.00-11010.00 CAMCO 5 "
9900.00-11038.00 CAMCO 5 "
12000.00-12337.00 CAMCO 5 "
9750.00-11270.00 CAMCO 5 "
11095.00-12076.00 CAMCO 5 "
5300.00-11200.00 CAMCO 5 "
0.00- 2840.00 CAMCO 2/5"
0.00- 9860.00 CAMCO 2 ."
12/08/91 fl 9950.00-10240.00 CAMCO
12/05/91 fl
11100.00-11450.00 CAMCO
12/05/91 fl
9850.00-10200.00 CAMCO
Information Control
Well Records
Adrian J. Martin
RECEIVED
JAN 0 8 1992
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-S1'11
TO: DISTRIBUTION Date :07/03/91
T#:82550
FROM:
Information Control
Well Records LR2-1
SUBJECT: BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
H-08 CL 06/25/91 #1 7890-8760 Atlas 5"
J-02 CL 06/26/91 #1 9890-10174 Atlas 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
JUL
BP EXPLORATION
BP ExploratIon (Alaska) Inc.
900 East Benson Boulevarcl
P.O. Box 196612
Ancl~orage. Alaska 99519-6612
(907) 561-5111
TO:
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
TE OF ALASK~-,5
ARcHiVES
DATE: 01/08/90
T$: 80771
BP FINAL DATA - PRESSURE SURVEY DATA
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
C-20 Static Gradient 12/25/89 Camco
C-31 Static Gradient 12/29/89 Camco
F-30 Static Gradient 12/27/89 Camco
H-12 Static Gradient 12/30/89 Camco
J-02 Flowing Gradient 12/31/89 Camco
X-07 Flowing Gradient 12/25/89 Camco
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution Date: 10/23/89
Transmittal: 80515
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
A-14 TEMP 10/05/89 %1 500-8940 Camco
C-19 FM/TEMP 10/07/89 %1 11100-11450 Camco
C-31 FM/TEMP 10/06/89 %1 11400-11665 Camco 5"
J-02 PROD 10/06/89 %1 9900-10210 Camco
J-07 PITS 10/04/89 %1 11150-11450 Camco
J-15 PROD/TEMP 10/06/89 %1 11000-11580 Camco
M-12 MISC GAS 10/05/89 %1 9750-10000 Camco 5"
M-17 GAS LIFT 10/06/89 %1 SURFACE-9370 Camco 1"/5"
R-10 LEAK DET. 09/30/89 %1 180-9650 Camco
X-01 PROD 10/03/89 %1 7850-9350 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
RESERVOIR
ARCHIVES
BP EXPLORATION
OR I GIN
BP Exploration (Alaska) Inc. ~__~ ,
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 18, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 (23'10-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of performing a cement squeeze and reperforation
of the well.
Yours very truly,
MJ~naA~eBrr~grogduct ion Engineering
JAM: JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
.$KA OIL AND !~'
STATE
OF
ALASKA
/,
GAS CONSERVATION COMM
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1080' SNL, 1245' WEL, SEC. 09, T11N, R13E, UPM
At top of productive interval
2068' NSL, 1886' EWL, SEC. 10, T11N, R13E, UPM
At effective depth
1882' NSL, 2022' EWL, SEC. 10, T11N, R13E, UPM
At total depth
1759'NSL, 2072'EWL, SEC. 10, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 10420 feet
true vertical BKB 9213feet
Stimulate . Plugging
Repair well
5. Type of Well:
Development X
Exploral~
Stra~lgraphic
Service
Plugs (measured)
Other
6.
Perforate
X
Datum elevation (DF or KB)
KBE ,, 57.33 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J-02 (23-10-11-13) PBU
9. Permit number/approval number
69-97 / 9-358
10. APl number
50- 029-20023-01
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 10210feet
true vertical BKB 9036feet
Junk (measured) fill at 10210' MD (06/89)
Casing Length Size
Structural , .
Conductor 70 30
Surface 911 20
Intermediate 4569 13 3/8
Production i 10357 10 3/4
Liner 9163 7
Perforation depth: measured 10160'- 10165', 10175'- 10209'
true vertical subsea
8934'- 8978' (two intervals)
Cemented Measured depth True vertical depth
BKB
175 sx 90 90
2000 sx 931 931
3150 sx 4589 4332
2095 sx 10410 9203
535 sx 9216 8137
Tubing (size, grade, and measured depth)
Sqzd: 10007'-10022', 10037'-10046', 10067'-10082',
10094'-10114', 10128'-10160', 10209'-10212'
4 1/2" L-80 to 9186~ 3 1/2" EUE 9186'-9211' with 2 7/8" tailpipe to 9350'
Packers and SSSV (type and measured depth) 7" BOTpacker at 9211'; 4 1/2" K-valve at 2028'
13. Stimulation or cement squeeze summary see attachment ~.
14.
Intervals treated (measured)
Treatment description including volumes used and final pressure ~,I~S[~
Representative Dailv Averaae Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 1460 9397 0 0 2192
Subsequent to operation 2640 3892 10 0 408
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil x Gas Suspended Service
17. I hereby.~~t,~,.~:o~s true and correct to the best of my knowledge.
Signed ~.~~'~/~'~ 4,.~ Title Manager Production Engineerin~ Date
Form 10-4:0~, Rev 06~15/88 // SUBMIT IN DI~'~L,i~CATi::
WELL .1-02 ¢23-10-11-13~
CTU CEMENT SOUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations was performed as follows:
5/10-11/89 Performed perforation acid wash. Pumped cement and squeezed
existing perforations. Reversed out cement after squeeze was obtained.
5/12/89 Performed inflow test, okay.
6/4/89 Reperforated the following intervals using Dresser Atlas 2" HSC carrier
guns loaded with 6-gram charges at 4 spf:
10160' - 10165' MD BKB
10175' - 10209' MD BKB
All depths are referenced to BHCS 10/28/69.
6/6/89 Performed nitrogen lift, then returned well to production and tested.
jam
9/13/89
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL '
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
Date: 06/09/89
Tf: 80118
BP CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
A-18 Collar 06/05/89 %1 9235-10235 Atlas
A-22 Completion 06/02/89 %1 11300-11783 Cch
A-35 Completion 06/02/89 %1 9550-9775 Cch
C-26 Completion 06/03/89 %1 11223-11754 Cch
F-07 GR 06/03/89 %1 9157-11590 Sch
J-02 Collar 06/04/89 %1 9100-101184 Atlas
N-11A Gas Lift Temp Cur 05/17/89 %1 2500-10603 Camco
N-19 Gas lift Temp Cur 05/17/89 %1 2500-10010 Camco
S-15 Temp-Spin 05/20/89 %1 2500-11458 Camco
Q-04 Completion 06/04/89 %1 9365-9600 Cch
J-06 GR ~ 05/16/89 %1 10000-11452 Camco
W-37, Pits 05/19/89 %1 9650-10214 Camco
GC-lC Collar 06/03/89 %1 5-3585 Cch
GC-lC Straddle Ass Setting Record 06/03/89 %1 3368-3595
5"
5"
5'
5"
5"
1"/5'
1"/5"
1"/5"
5"
5"
5"
5'
Sch 5"
Received:
Date:
~~C~! V~~rmation Control
( / ~ JU~lZi ]~89 Well Records LR2-1
J. Dietz/S. McCurry
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
May 4, 1989
(
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 (23-10-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perform a cement squeeze and reperforation of the
well.
Yours very truly,
~J.~A. Bragg ' ~
Manager Production Engineering
JAB: JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
STATE OF ALASKA
· ~KA OIL AND GAS CONSERVATION COMMI .~N
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Alter casing Repair well . ..
Change approved program
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1080' SNL, 1245' WEL, SEC,. 09, T11N, R13E, UPM
At top of productive interval
2068' NSL, 1886' EWL, SEC. 10, T11N, R13E, UPM
At effective depth
1867' NSL, 2031' EWL, SEC. 10, T11N, R13E, UPM
At total depth
1759'NSL, 2072'EWL, SEC. 10, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 10420 feet
true vertical BKB 9213 feet
Abandon Suspend ~ Operalion Shutdown ~ Re-enter suspended well
Plugging ..
Pull tubing .... Vadance
5. Type of Well:
Development x
Exploratory ~
Stratlgraphic
Service
Time extension
Perforate
6.
Plugs (measured)
~mulato
Olher x
Datum elevation (DF or KB)
KBE = 57.33 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
J-02 (23-10-11-13) PBU
9. Permit number
69-97
10. APl number
50- 029-20023-01
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 10249 feet
true vertical BKB 9058 feet
Junk (measured) fill at 10249'MD (04/88)
Casing Length Size
Structural --
Conductor 70 30
Surface 911 20
Intermediate 4569 13 3/8
Production 10357 10 3/4 x 9 5/8
Liner 9163 7
Perforation depth: measured 10135'. 10165', 10175'. 10212'
true vertical subsea
8911' - 8980' (two intervals)
Cemented Measured depth True vertical depth
BKB
175 sx 90 90
2000 sx 931 931
3150 sx 4589 4332
2095 sx 10410 9203
535 sx 9216 8137
Sqzd: 10007'-10022', 10037'-10046', 10067'-10082',
10094'-10114', 10128'-10135'
RECEIV
Tubing (size, grade, and measured depth) 4 I/2" L-80 to 9186'; 3 1/2" EUE 9186'-9211' with 2 7/8" tailpipe to 9350'~v~,~ ~/ -. 9 ~t~'
Packers and SSSV (type and measured depth) 7" BOTpacker at 9211'; 4 1/2" K-valve at 2028' ~'~la$1(a Oil & (]as Coils.
13. Attachments Description summary of proposal x Detailed operations program
BOP sketch
14. Estimated date for commencing operation
May 1989
16. If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
17. I hereby certify that the for~.oin~is true and correct to the best of my knowledge.
Signed ~'~'~f/~'Z~/~!/~-~"P~ Title Manager Production Engineering
//./ y~' FOR COMMISSION USE ONLY
ConditiOns of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subsequent form required 10-
Approved by order of the Commission
15. Status of well classification as:
Suspended
Returned
Commissioner Date ~'~//~'
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
7
WELL J-02 (23.10-11-13~ PBU
CTU CEMENT SOUEEZE PROPOSAL
A coiled tubing cement squeeze of existing perforations is proposed as follows:
1. Perform pre-workover surveillance.
2. Rig up CTU and support equipment and pressure test BOP's to 4000 psi.
3. Perform perforation acid wash.
4. Pump cement and squeeze existing perforations.
5. Reverse out cement after squeeze is obtained. Wait overnight, then test
squeeze by performing inflow test. If squeeze fails, immediately resqueeze.
6. If squeeze is successful, reperforate the following intervals:
10160' - 10165' MD BKB
10175' - 10211' MD BKB
All depths are referenced to BHCS 10/28/69.
7. Return well to production and test.
jam
4/25/89
Coiled
B I ow-Out-Preventers
Coiled Tubing
:] ..
,%
· ·
Pack-Of~
Blind Rams
I Cutter Rams
.-~, .
2 Chk:ksan (Kltt Line)
,~ Slfps
'~=~ Pipe Rams
.Pump-In Sub
(CIrc uLa te/R e turns
W ell Head
Swab Valve
if:'-,? ,:
g:.: ,. :;;:'
·
,.
:
.,
t.:,'
. ..
,
¢-'7,
, .
TO:
ARC()
CHEVRON
TE}D\CO
HOBIL
PHILLIPS
STATE OF ALAStO\
GEOSC IENCES
RES E RVO I R
REFERENCE: ARCHIVES
SAPC CASED HOLE FINAL LOGS
STANDARD
' , ~ F', .'% ;'-'; ,(--
;'~,L~:..SrO-, :r ..DJ
Oate: 10-31-88
T~: 79485
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
K-08
J-02
LDT/CNL 10-30-88 #1 10250-10856 ATLAS 5"
PLS 10-28-88 #1 9900-10220 ATLAS 5"
Rece i ved
A un,f ut Ihe O~.g;nol 51(]ndu,d O,I Co0-Dony
Founded o. Cle-elo,,d. O~.o..n 1870
Shirley R. McCurr7
INFORMATION CONTROL
We I I Records LR2- I
Slandard A la**~(~'
Prod u¢l'ion Company
900 EO$I B.~n',-.on 8oulevord
P.O. Bo,, 19661?
Anchoroge. AIo,,~,O 9'~519.6612
(907! 564.511 !
HOUSTON
i NDEXED
TO:
ARCO
CHEVRON
E~KON
TEXACO
MOBIL
STANDARD
ALASKA PRODUCTION
Date:
o8/17/88
TI:
79216
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE:
ARCHIVES
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
A-23
J-02
R-23
S-20
S-20
Y-O8A
CCL/Bridge Plug Srtting
CCL/Perf '<'
CCL/Perf
Continuous Flow Survey
Diff/Temp/Log
Collar
06/22/88 ~1 ,10400-10606 GO 5"
07/06/88 #1 9806-10230 GO 5"
06/16/88 #1 11700-12050 GO 5"
07/05/88 #1 9160-9710 GO 5"
07/05/88 #1 9000-9720 GO 5"
06/23/88 #1 2200-2900 GO 5"
EEE E
Rece J ved
O~ te N~k~ Oil & Gas Con,~ Commission
...... ,,. .... ~,..o, ~ .... ~,,.,, o, ~ .......... , ;Anchorage
Founded ,n
Jennifer DietZ
I NFORMAT I ON CONTROL
Wel I Records LR2-1
DAI.,I..AS
ARCO
CHEVRON
E~XON Date: 04/14/88
TEXACO 78732
TO: -- Tt:
MOBIL
PHILLIPS
STATE OF ALASKA
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It fo this office:
C-4 04/01/88 Static Gradient Camco
G-7 04/02/88 Flowing Gradient Camco
~/~ 04/03/88 Static Gradient Camco
./
Received
Victoria Aldridge
INFORHATION CONTROL
Date Well Records LR2-1
Founded ,n Cle~elo-(t O~,n ,,, 1870
Standard Alaska
Production Company [
900 East Benson Boulevar~
P.O. Box 196612
Anchorage, Alaska 99519-6612
/907) 561-511t
STANDARD
ALASKA PRODUCTION
January 26, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 (23-10-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of performing a cement squeeze and
reperforation of the well.
Yours very truly,
JAB: JAM ~
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
J=2 Well File
aA. Bragg ~U
nager Production Engineering
RECEIVE.i)
JAN ~ ? ~fi~
Alaska Oil & Gas Cons. Commisslo~
Anchorage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA '~M-~
ALA , OIL AND GAS CONSERVATION CO .~SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing []
Alter Casing [] Other []
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
1080' SNL, 1245' WEL, Sec. 09, TllN, R13E, UPM
5. Datum elevation (DF or KB)
KBE = 57.33 AMSL
6. Unit or Property name
Prudhoe Bay unit
7. Well number
J-2 (23-10-11-13) PBU
At top of productive interval
2068' NSL, 1886' EWL, Sec.
At effective depth
1779' NSL, 2056' EWL, Sec.
At total depth
1759' NSL, 2072' EWL, Sec.
10, TllN, R13E, UPM
10, TllN, R13E, UPM
10, TllN, R13E, UPM
8. Approval number
7-599
9. APl number
50--029-20023-01
10. Pool
Prudhoe Oil Pool
Feet
11. Present well condition summary
Total depth: measured
true vertical
10420' feet Plugs (measured)
9213 feet BKB
Effective depth: measured
true vertical
10355 feet Junk (measured)
9124 feet BKB
Casing Length
Structural __
Conductor 70 '
Surface 911'
Intermediate 4569 '
Production 10357 '
Liner 9163'
Size Cemented Measured depth True Vertical depth
30" 175 SX 90' 90'
20"' 2000 sx 931' 931'
13 3/8" 3150 sx 4589' 4332'
10 ~ x95
~ 2095 SX 10410' 9203'
7" 535 SX 9216' 8137'
Perforation depth: measured
10175' - 10212"
true vertical (ss)
8947' - 8980'
Tubing (size, grade and measured depth)
Squeezed:
10007'-10022',10037'-10046' ,
10067'-10082' , 10094'-10114' ,
10128' -10163'
4 1/2" L-80 to 9186'; 3 1/2"' EUE 9136-9211' with 2 7/8" tailpipe to 9350'
Packers and SSSV (type and measured depth)
7" DOT packer at 9211'; 4 1/2" K-valve at 2028' D~.~[~
12.
Stimulation or cement squeeze summary
See attachment
Intervals treated (measured)
JAN 2 7 19S8
Treatment description including volumes used and final pressure
Alasl~ Oil & Gas Cons. Commissie
Anchorage
13.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
1740 6709 35 0
1996
Subsequent to operation
750 875 95 0
190
14. Attachments
Daily Report of Well Operations []
Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Form 10-4~Rev. 12-1-85
Title Manager Production Engineering
Date/' Z(~ .~v,
Submit in ~uplicate
Well J-2 (23-10-11-13) PBU
CTU CEMENT SQUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations was performed as
detailed below.
09/24/87
Rigged up coiled tubing unit and pressure tested BOP's to
4000 psi. Performed perforation mud acid wash; flowed well.
09/25/87 Cement squeeze the following perforated intervals:
10007' - 10022' MD BKB
10067' - 10082' MD BKB
10128' - 10163' MD BKB
10175' - 10212' MD BKB
10/11/87
Contaminated cement in the wellbore, then reversed out
cement after 24 hours; pressure tested squeeze.
Reperforated the following interval as follows using
Schlumberger 2 1/8" Hyperdome guns at 4 spf:
10175' - 10212' MD BKB
10/18/87
Returned well to production and tested.
Reperforated the interval 10175' - 10212' MD BKB again using
Schlumberger 2 1/8" Hyperdome guns at 4 spf.
Returned well to production and tested.
0822Z
~m(1/12/88)
.Standard Alaska
P~e~lu¢ t;on Corr, p~:~
900 I~o,t B~n~o,,
PO ~, 196612
A~(ho, og~. Alaska 99~19 6612
INDEXED
DALLAS
ARCO
CHEVRON
E~XON
TEXACO Date: 12/30/87
TO: blOBIL TI: 78364
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
AL ASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
~J C-3
'" C-5
~ C-21
"~ C-27
Spinner 12/07/87 #1 9850-10200 Camco 5"
GR/CCL 12/08/87 #1 10900-11839 Camco 5"
GR/CCL 12/01/87 #1 7800-9100 Camco 5"
Production Profile 12/06/87 #1 10000-11230 Camco 5"
Flowmeter 12/09/87 #1 9950-10260 Camco 5"
Producttion Profile 12/03/87 #1 8850-9330 Camco 5"
Rece i ved
Dale
v .,: ..... ,,--_ _ _ ~/ Victoria Aldridge
,UasKa Uil & L~aS I;orls. I~0m111[$$f011i I NFORHAT ION CONTROL
AllCJl0rE, j]e We I I Records LR2- I
A un;t of the o,'g;~ol S~ondo~d O,I Co,v, ponl~
Founded ,m Cleveland. Ohio. ,n 1870
Stondotd
P~odu¢lion Compa
900 Eo,,I Ben,,on Bo~.
P.O. Bo~ 196612
Anchorage. AIo$1~o 99.519.66
1~07! 564-51 I I
DALLAS
ARCO
INDEXED
.,,
CHEVRON
EXXON
TEXACO Oate: 10/21/87
TO: MOBIL Il: 78247
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
Al. ASKS,, PRODtJC FION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
slgnlng a copy of thls letter and returning It to this office:
E-3
F-9
J.,2
J-20
J-26
J-27
M-13
Production Profile
Temp/Flowmeter
Perf. Record
Production Profile
Perf. Record
Production Profile
Injection Profile
10/02/87 #1 12250-12675 Camco 5"
09/27/87 #1' 9700-10220 Camco 5"
10/11/87 #1 9071-10274 Sch 5"
10/01/87 #1 11900-12170 Camco 5"
10/14/87 #1 9400-10647 .Sch 5"
10/03/87 #1 9400-9550 Camco 5"
10/01/87 #1 9300-9633 Camco 5"
. !
Rece i ved
Date
M./klaska 0il & Gas Gons. uu,,,,,, ~ Victoria Aldridge
Anchorage I NFORHAT I ON CONTROL
Wel I Records LR2-1
A u,,.~ o! ~he o~'.g.-ol 5s(.,',do,(! C)d
Fo~;,,ded m (~leve. lo~,d O~.o' ,n 1871)
Standard Alosko~<
Production Coml~
900 East Be,~on
P.O. ~. 19~1~
Aritho,age. Alaska 99519-66
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
TO: MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
INDEXED
_
STANDARD
ALASKA PRODUCTION
Date: 10/26/87
.TI:
78273
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material is being submi?ted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
~'~E-28
~" E-28
----E-28
"'- J-2
'~ K-13
CBT 10/17/87 #1 9000-12430 Sch 5"
CET 10/17/87 #1 9000-12430 Sch 5"
GR/CCL 10/19/87 #2 8840-10775 Sch 5"
Perf. Record 10/18/87 #2 9100-10274 Sch 5"
CBT 10/19/87 #1 10980-12096 Sch 5"
Standard Alaska
Produ~dion Comp~
900 East Benson go~L ord
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 8, 1987
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 (23-10-11'13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perform a cement squeeze and reperforation of the
well.
Yours very truly,
JAB:JAM~
Enclosures (9)
cc: J. L. Haas (MB12-1)
J-2 Well File
~J. A. Bragg
Supervisor Production Operations
RECEIVED
Alaska Oil & Gas Cons. Cornn~JssJor~
Anchorage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
,~ STATE OF ALASKA (.'
AL .,A OIL AND GAS CONSERVATION CO ,_,ISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
1080' SNL, 1245' WEL, Sec. 09, TllN, R13E, UPM
At top of productive interval
2068' NSL, 1886' EWL, Sec. 10, TllN, R13E, UPM
At effective depth
1779' NSL, 2056' EWL, Sec. 10, TllN, R13E, UPM
At total depth
1759' NSL, 2072' EWL, Sec. 10, TllN, R13E, UPM
5. Datum elevation (DF or KB)
KBE = 57.33
6. Unit or Property name
Prudhoe Bay ~nit
7. Well number
J-2 (23-10-11-13) PBU
8. Permit number
69-97
9. APl number
50--029-20023-01
10. Pool
Prudhoe Oil Pool
feet
11. Present well condition summary
Total depth: measured
true vertical
10420 feet Plugs (measured)
9213 feetBKB
Effective depth: measured 10355 feet Junk (measured)
true vertical 9124 feetBKB
Casing Length Size Cemented Measured depth True Vertical depth
Structural -- BKB
Conductor 33' 30" 175 sx 70' 70'
Surface 898' 20" 2000 sx 931' 931'
Intermediate 4556' 13 3/8" 3150 sx 4589' 4332'
Production 10377' 10 ~ x 9
5
§ 2095 sx 10410' 9203'
Liner 9183' 7" 535 sx 9216' 8137'
Perforation depth: measured 10007' -10022' Squeezed,but leaking 10094'-10114' Squeezed
10037'-10046' Squeezed 10128' -10163' Open
10067'-10082' Leaking 10175'-10212' Open
true vertical
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9186' ;~;3 1/2" EUE 9186'-9211'; with 2 7/8" tailpipe to 9350'
Packers and SSSV (type and measured depth)
7" BOT packer at 9211'; 4 1/2" K-valve at 2028'
12.Attachments
Description summary of proposal []
13. Estimated date for commencing operation
Detailed operations program [] BOP sketch []
RECEIV[g
September 1987
14. If proposal was verbally approved
Name of approver
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Sig~ed ~.~--¢r~::::=~ Title Supervisor Production operations Date
· ~C J- ~ Bragg -- CommiSsion Use Only
Conditions of approval
Approved by
Form 10-403 Rev 124-85
Notify commission so representative may witness
[] Plug integrity [] BOP Test [] Location clearance
~roved Cc~y
~turn~d
Commissioner
[ Approval No. 7 ._ .,~.~~
by order of
the commission Date ¢---/Z~ ~
Submit in triplicatF~
Well J-2 (23-10-11-13)
CTU CEMENT RESQUEEZE PROPOSAL
A coiled tubing unit cement resqueeze of leaking "squeezed" perforations
and existing perforations is proposed. The existing perforated intervals
are as follows (ref. BHCS/GR 10-28-69):
10,128f - 10,163f MD BKB
10,175~ - 10,212~ MD BKB
In addition, the following intervals were squeezed during the previous CTU
workover, but are now leaking:
10,007~ - 10,022~ MD BKB
10,067f - 10,082~ MD BKB
This work is outlined below:
1. Perform preworkover surveillance.
2. Rig up CTU and support equipment.
3. Perform perforation mud acid wash, flow well.
4. Clean out sump.
5. Cement squeeze all perforations.
6. Contaminate cement. WOC.
7. Clean out contaminated cement. Pressure test squeeze.'
8. Reperforate as follows:
10,175~ - 10,212f (37') MD BKB
(Depths ref. BHCS/GR 10-28-69)
9. Return the well to production.
10. Obtain a production test.
Alaska Oi~ & (~s Cons, Commi,~sio~
Anchorage
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Off'
Blind Rams
Cutter Rams
Chicksan (Kill Line)
Slips
Pipe Rams
Pump-In Sub ~
(C ircula te/R e turns)
W ell Head
Swab Valve
P,oductlon Compa~
900 Ec,~ 8,.',,~on Bol~
P~O Bo~ 196612
A,,¢ho,oge. Alos~o 99~19-661~
i9071 564.511 I
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE ,OF ALASKA
GEOSC IENCES
INDEXED
, ,
STANDARD
ALASKA PRODUCTION
Date: 0 4 / 2g / 87
TI: 77RS3
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
F-18 Perf. Recard 01/05/87 ~1 11693-12313 Sch 5"
H-17 Ccmp le tion Record 12/20/86 #2 10258-10804 Sch 5"
j'2 Perf. Record 01/05/87 #2 10000-10 278 Sch 5"
M-28 Cc~p le tion Record 12/05/86 #1 8000-9194 Sch 5"
S-6 Perf. Record 12/23/86 #3 10200-10615 Sch 5"
Y-24 Perf. Record 01/01/87 #2 12700-13451 Sch 5"
G- 24 CBT 01/23/87 ~1 9060-1039 2 Sch 5"
G-24 CET 01/23/87 ~1 9060-10398 $ch 5"
G- 24 GCT 01/23/87 #1 0-10350 Sch 5"
G-29 CET 10/15/86 ~1 8920-10076 Sch 5"
Date / /Ala~ka 0ii & Oas Cons. Commission INFORMATION CONTROL
/ .. / -.--.~-- . ~,-,~hnr:arlR We l I Records LR2-I
A un,t o1 the ~;9,nol 5londor~l Ce6npOnt/
founded ,n cl~m 1/170
Stando,d Alaska
Produc lion Company
900 Eo~! Ben~o,~ Boul~
PO. Bo. 1966;2
~Tj 564-51 I I
.,.
INDEXED
DALLAS
ARCO
CHEVRON ' STANDARD
ALASKA PRODUCTION
E,'C~OI',I
TEXACO Date: 04/12/87
TO: MOBIL TI: 77832
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
~ B-26
B-27
"~ c-35
"- F-17
'~'"~ F-17
"~" G-30
~"-~ J-2
"~ M-12
''"'~M-12
"~ M-13
"~ R-9
--.o Y-22
~ Y-23
Perf. Record 02/24/87 #1 11000-11238 Sch
Spinner/CFS 03/13/87 #1 10650-10900 Camco
Spinner/cFS 03/1'3/87 #! 9350-9580 GO
Spinner/CFS 04/06/87 #1 10800-11250 GO
DFT 04/06/87 #1 10700-11280 GO
Production Log(Spinner) 04/09/87 #1 9500-9755 Sch
Production Log(Spinner) 04/08/87 #1 9900-10270 Sch
Temp. 03/21/87 #1 9700-10200 GO
Spinner/CFS 03/21/87 #1 9700-10200 GO
Water Injection Survey 03/26/85 #1 9300-9647 Sch
Pump-in Temp. 03/11/87 #1 9000-9641 GO
Spinner/CFS 03/15/87 #1 11000-11340 GO
Spinner/CFS 03/15/87 #1 10900-11470 GO
5II
5"
5"
5"
5"
5"
5"
5"
5"
5"
~ec~ived . ~ ' I,"~...) ' Victoria Aldridge
/
~~-.~ ~, - n ~ Well Records LR2-1
~ Cte.~lon~l. ~,o. m 1810
Standard Alaska
Production Company f"
900 East Benson Boulev~
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
April 2, 1987
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 (23-10-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations,
for the above-named well. This contains our subsequent report of
performing a cement squeeze and reperforation of the well.
Yours very truly,
JAB:JAM~
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
J-2 Well File
Supervisor Production Operations
RECEIVED
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
{ STATE OF ALASKA
ALA , OIL AND GAS CONSERVATION CO JSION
REPORT OF SUNDRY WELL OPERATIONS
1 Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing []
Alter Casing [] Other []
.
Name of Operator 5.
STANDARD ALASKA PRODUCTION COMPANY
Address 6.
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
Location of well at surface 7.
1080' SNL, 1245' WEL, Sec. 09, TllN, R13E, UPM
At top of productive interval
2068' NSL, 1886' EWL, Sec. 10, TllN, R13E, UPM
At effective depth
1779' NSL, 2056' EWL, Sec. 10, TllN, R13E, UPM
At total depth
1759' NSL, 2072' EWL, Sec. 10, TllN, R13E, UPM
Datum elevation (DF or KB)
KBE = 57.33
Unit or Property name
Prudhoe Bay Unit
Well number
J-2 (23-10-11-13) PBU
8. Approval number
617
9. APl number
50-- 029-20023-01
10. Pool
Prudhoe Oil Pool
Feet
11. Present well condition summary
Total depth: measured
true vertiCal
10420 feet Plugs (measured)
9213 feet BKB
Effective depth: measured 10355 feet Junk (measured)
true vertical 9124 feet BKB
Casing Length Size Cemented
Structural --
Conductor 33 ' 30" 175 sx
Surface 898 ' 20" 2000 sx
Intermediate 4556' 13 3/8" 3150 sx
Production 10377' 10 .~ x':9 ~ .' 2095 sx
Liner 9183 ' 7" 535 sx
Perforation depth: measured
10128' - 10212' (two intervals)
true vertical (subsea)
8905' - 8980'
Tubing (size, grade and measured depth)
Measured depth True Vertical depth
BKB
70' 70'
931' 931'
4589' 4332'
10410' 9203'
9216 ' 8137 '
Note:
Original intervals from
10007'-10114' were left
squeezed.
4 1/2" L-80 to 9186'; 3 1/2" EUE 9186'-9211'; with 2 7/8" tailpipe to 9350'
Packers and SSSV (type and measured depth) ·
7" BOT packer at 9211'; 4 1/2" K-valve at 2028'
12.
13.
Stimulation or cement squeeze summary
See attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
Representative Daily Average Production or Injection
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation
Subsequent to operation
3250 13491 0 0 2097
3170 13232 0 0 1556
14. Attachments
Daily Report of Well Operations ~ Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
=orm 10-4~4' Rev. 12-1-85 ' '
Title Supervisor Production Operations Date
Submit in Duplicate
Well J-2 (23-10-11-13) PBU
CTU CEMENT SQUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations was performed
as detailed below. Following CTU operations, the following perforated
intervals were abandoned:
10007' - 10022' MD BKB
10037' - 10046' MD BKB
10067' - 10082' MD BKB
10094' - 10114' MD BKB
1/5/87:
Added squeeze perforations 10202' - 10212' MD BKB; flowed
well.
1/13/87:
Performed pre-workover pump-in temperature survey; flOwed
well.
2/20/87: Performed perforation mud acid wash; flowed well.
2/21/87:
Rigged up coiled tubing unit and pressure tested BOP's to
4000 psi. Pumped in cement to squeeze off all perforations.
Contaminated cement in the Wellbore; then reversed out after
48 hours. Pressure tested squeeze.
3/12/87:
Rigged up Schlumberger and perforated the following intervals
using 2 1/8" Hyperdome guns at 4 spf:
Reperf:
Add'l. perf:
10128' - 10163' MD BKB (8905' - 8936' TVDss)
10175' - 10212' MD BKB (8947' - 8980' TVDss)
(Depths are referenced to BHCS/GR, 10/28/69.)
Returned well to production and tested.
jm
3/25/87
DALLAS
INDEXED
ARCO
CHEVRON
EXXON
TEXACO Date: 03/31/87
TO: MOBIL TI: 77804
PH IL'L'I'PS "
STANDARD
ALASKA PRODUCTION
STATE OF ALASKA
o
GEOSCIENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The roi lowing material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning. It to this office: :
B-7 Perf. Record 03/17/87 gl
C-38 Production Profile 03/12/87 gl
D-3 WOPITS 03/03/87 gl
G-1 Flowmeter/Temp. 03/18/87 gl
G-19 . Fullbore Spinner 03/15/87 gl
H-13 Production Profile 03/15/87 gl
H-17 Production Profile 03/11/87 gl
J-2 Completion Record 03/12/87 #2
J-5 Perf. Record 11/16/86 gl
K-5 Perf.'Record 10/03/86 gl
M-14 Step Rate/Injection Profile 03/21
Q-5 Perf. Record 10/01/86 #2
S-13 Production Profile 02/25/87 gl
Y-22 Perf. Record 09/06/86 gl
Y-24 WOPITS 03/14/87 gl
Y-24 Perf. Record 10/28/86 gl
/87
11500-11848 Sch' 5"
10825-11137 Camco 5"
10300-10660 Camco 5"
9750-10079 Camco 5"
11250-11500 Sch 5"
9200-9520 Camco 5"
10250-10600 Camco 5"
10000-10283 Sch 5"
9990-10360 Sch 5"
8800-9740 Sch 5"
gl 10200-10750 Camco
10000-10333 Sch 5"
10800-11201 Camco 5"
10500-11374 Sch 5"
13150-13531 Camco 5"
12700-13462 Sch 5"
5I!
Date
~ ~ T\~ ~'~" "~ ~"
A un;l ol the o~;nol Sfondo~d~ony
Founded ,n Ciera ond ~;o. ~~t870~ ~{~1'~::;~~(';t
' ~ -~ka 0~1 & Gas Cons.
Victoria Aldridge
[NFORMAI [ ON CONIROL
We[ [ Records LR2-[
Standa,d Alaska
Production Company ~
900 East Benson Boule~F
P.O. Box 196612~
Anchorage, Alaska 99519-6612
{907) .564-5 ! I !
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 01/22/87
TO: MOBIL TI: 77675
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS '
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returnlng It to thls offlce:
J-2 wOPITS 01/13/87 #1 9800-10222 Camco 5"
K-5 'FloPetrol 01/10/87 #1 9300-9720 Sch 5"
M-21' FloPetrol 12/31/86 #1 8850-9220 Sch 5"
N-8 Flopetrol 11/01/86 #1 9600-9850 Sch 5"
~ ~/';" ~"i > ~'~? I NFORHAT I ON CONTR~I3Lg
~ -
Date~~'~:~'"' ..... ~t~,;,:~ '- We I I Records LR2-1
Founded in Clave 1870
Stondo,d Alosho
Production Company
900 EosI 8ansan Boulevard
P.O. Box 19661?
Ancho, oge. AIc~$~o 995 !9-66
J907! 564-311 I
INDEXED
TO:
DALLAS
ARCO
CHEVRON
EXXON
TE,v~co
MOBIL
PHILLIPS
STATE OF ALASKA
STANDARD
ALASKA PRODUCTION
Date: 01/22/87
~t: 77678
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
B-19 Static Gradient 01/09/87 Camco
B-27 Static Gradient 01/09/87 Camco
H-6 Static Gradient 01/08/87 Camco
H-24 STATIC Gradient 01/08/87 Camco
J-2 Static Gradient 01/i3/87 Camco
N-22 Sta~.~r'adient 01/05/87 Go.
U-2 Static Gradient 01/06/87 Camco
U-6 Static Gradient 01/06/87 Camco
U-8 Static Survey 01/05/87 Go.
X-7 'Static Gradient 01/17/87 Camco
X-9 Static Gradient 01/17/87 Camco
X-14 S~atic Gradient 01/12/87 Camco
-.-,~_~a~ ..... A,qCh(),r~.~ I NFORHAT I ON CONTROl_
Date Wel I Records LR2-1
Founded ,,, Cle,~ln,,¢f
Standard Alaska
I~oduction
Company (~r
900 East Bern. on ~oulevo11~
P.O Bo~ 196612
Anchorage. Alaska 99519-6612
(907l 564-51 ! I
INDEXED
DALLAS
ARCO
CH~VRO~ STANDARD
ALASKA PRODUCTION
EXXON
TEXACO Date: 01107187
TO: MOBIL TI: 77646
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
C-32
D-1
D-24
D-25
F-5
F-5
F-5
F-9
F-18
F-23
H-21
J-2
M-4'
M-23
M-28
S-15
S-19
U-13
X-14
Perf. Record 08/14/86 #1 9220-10398 Sch 5"
" " 07/21/86 #1 9010-9778 Sch '5"
per.f~ Record 07/28/86 #1 9690-11060 Sch 5"
Perf. Record 07/26/86 #1 9990-10876 Sch 5"
Tubing Puncher 08/16/86 #1 Sch 5"
EPL ~: 08/17/86 #1 0-9650 Sch 5"
Tubing Puncher 08/21/86 9300-9663 Sch 5"
Collar 07/28/86 #1 8500-8810 Sch 5"
Perf. Record 07/19/86 #1 11210-12220 Sch 5"
CCL-tie-in 12/31/86 #1 9500-10480 Camco 5"
Temp. 12/27/86 #1 2858-9827 Camco 5"
GR 12/31/86 #1' 9000-10333 Camco 5"
Production Profile 01/01/87 #1 11150-11630 Camco 5"
· Production Profile 12/30/86 #1 9350-9850 Camco 5"
Injection Profile 01/02/87 #1 8580-9160 Camco 5"
EPL 07/07/86 '#1 11200-11750 Sch 5"
FLowmeter 12/29/86 #2 9500-10050 Camco 5"
Perf. Record 07/25/86 #1 10195-11473 Sch 5"
Perf. Record 08/07/86 #1 10650-11510 Sch 5"
Rece I ved
Date
Oil & AGn~cShCorOa~ C0mmiss,0.
Auml of the o~ig;nol Stondo,d 0~1 Company
Founded ;n Cle,elond.
Victoria Aldridge
NFORMAT ~ ON CONTROL
Wel I Records LR2-1
Standard Alaska F
Production Compa~
900 East Benson ~o~,~.ard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
December 8, 1986
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 (23-10-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, kpplication for Sundry
Approvals, for the above-named well. This contains our proposal to
perform a cement squeeze and reperforation of the well.
Yours very truly,
·
JAB: JAM ~
Enclosures (9)
cc: J. L. Haas (MB12-1)
J-2 Well File
/ /J. A..Bragg
/Supervisor Production Operations
2! Z C ! 0 1986
AJasRa Oil & ~as Corrs. u'o,"~missior~
Anchorage
A unit of the or,ginal Standard Oil Company
Founded in Cleveland Ohio in 1870,
STATE OF ALASKA
ALAS(" :)IL AND GAS CONSERVATION COMI~'~'' 31ON
APPLICA'i ION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown : Re-enter suspended well ~ Alter casing ~.
Time extension ~ Change approved program ~ Plugging _~ Stimulate _ Pull tubing /~ Amend order ~ Perforate ~_ Other
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
1080' SNL, 1245' WEL, Sec. 09, TllN, R13E, UPM
At top of productive interval (top Sadlerochit)
2068' NSL, 1886' EWL, Sec. 10, TllN, R13E, UPM
At effective depth
1779' NSL, 2056' EWL, Sec. 10, TllN, R13E, UPM
At total depth
1759' NSL, 2072' EWL, Sec. 10, TllN, R13E, UPM
11. Present well condition summary
Total depth: measured
true vertical
10420 feet Plugs (measured)
9213 feet BKB
5. Datum elevation (DF or KB)
KBE = 57.33
6. Unit or Property name
Prudhoe Bay Unit
Well number
J-2 (23-10-11-13) PBU
8. Permit number
69-97
9. APl number
50-- 029-20023-01
10. Pool
iDrudhoe Oil Pool
feet
Effective depth: measured 10355 feet Junk (measured)
true vertical 9124 feet BKB
Casing Length Size Cemented
Structural - .-
Conductor. 33' 30" 175 sx
Surface 898' 20" 2000 sx
4556' 13 3/8" 3150 sx
Intermediate
10377 10 3/4 x 9 5/8 2095 sx
Production
Liner 9183' 7" 535 sx
Perforation depth: measured
10007' - 10163' (five intervals)
true vertical (subsea)
8758' - 8897'
~bing(size, grade and measured depth)
Measured depth True Vertical depth
BKB
70 ' 70 '
931' 931'
4589 ' 4332 '
1O41O' 9203'
! o 1986
Alaska 0ii & Gas Cons. uommJssJoll
Anchorage
4 1/2" L-80 to 9186'; 3 1/2" EUE 9186'-9211'; with 2 7/8" tailpipe to 9350'
Packers and SSSV(type and measured depth)
7" BOT packer at 9211'~ 4 1/2" K-valve at 2028'
12.Attachments Description summary ofproposal ~ Detailed operations program [] BOP sketch
13. Estimated dateforcommencing operation
January 1987
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby c.,ertify that the foregoing is true and correct to the best of my knowledge
Signed ~ Title Supervisor Production Operations Date IS- ~'"?(.,,
''(~/J. a. Bragg ~/(// Commission Use Only
Conditions of ap,proval:ii, i~'~, F!' Notify commission so representative~.,~ may witness~~ --"J, ~'Appr°val,,.,,-- a~,rNo' ~ t ~"7~, --_ :-: J._.
[] Plug integrity [] BOP Test [] Location olearance.~' __/ .~._ ..
~C '2'"" ¢~ ~ ~'¢~' ;~ by order of
Approved by ' - .............. Commissioner the commission Date
Form 10-403 Rev 124-85 Submit in triplicate
Well J-2 (23-10-11-13)
CTU CEMENT SQUEEZE PROPOSAL
A coiled tubing unit cement squeeze
proposed. After CTU operations, the
intervals will be abandoned:
of existing perforations is
following four perforation
10,007' - 10,022' MD BKB
10,037' - 10,046' MD BKB
10,067, - 10,082' MD BKB
10,094' - 10,114, MD BKB
The remaining existing perforation
and an additional interval will
outlined below:
interval will be reperforated
be perforated. This work is
·
4.
5.
6.
7.
8.
9.
Clean out sump.
Add squeeze perforations 10,202'-10,212, (5') MD
(ref. BHCS/GR 10-28-69), flow well.
Perform workover pump-in temperature survey, flow well.
Rig up CTU and support equipment.
Perform perforation mud acid wash,
Cement squeeze all perforations.
Contaminate cement. WOC.
Clean out contaminated cement.
Perforate as
flow well.
follows:
Pressure test
squeeze.
10
Reperforate: 10,128'-10,163,
Add perforations: 10,175'-10,212,
(Depths reference BHCS/GR 10-28-69)
Return well to production.
(35') MD
(37') MD
Coiled Tubing Blow*Out-Preventers
Coiled Tubing
Pack-Off
Blind Rams
~ ! Cutter Rams
2' Chicksan (Kill Line)
Pipe Rams
Pump-In Sub
(C irc u la te/R e turns)
Well Head
Swab Valve
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
DALLAS
ARCO
CHEVRON
EXXON
3111"C"STREET
ANCHORAGE. ALASKA
TELEPHONE{9071265-O000
MAIL:POUCH 6-612
ANCHORAGE. ALASKA 99SO2
TO: DAL/UNIT/STATE: TE~YACO
(-Marathon) MOBIL
Date: 1-21-86
PHILLIPS T#: 76716
STATE
BPAE (Transmittal Only)
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
J-2
Static Gradient
1-7-86 Camco
RECEIVEO
DATE
19
Cathy Perkins
IMFORbLATION CONTROL
Well Records LR2-1
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
October 19, 1983
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well J-2 ~3-10-11-13)PBU
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named well. This contains our subsequent to
installing a "K" valve in the well for downhole safety.
GJP~Pjw
Enclosures
~rs very truly,
District Petroleum Engineer
cc: J. D. Hartz
Geology
Well File 917
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 69-97
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20023-01
9. Unit or Lease Name
Prudhoe Bay Unit
4. Location of Well
At Surface:
1245' WEL, 1080' SNL, Sec.
9, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 57.33' AMSL
6. Lease Designation and Serial No.
ADL 28281
10. Well Number
J-2 (23-10-11-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pul/Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
,r-] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
This well was completed with an Otis "K" valve set at 2028' on August 4, 1982.
This valve is being utilized for downhole safety.
14. I he n~ is true and corroct to tho host of mg kno~lod~e.
Signed ~~ ~ ~ ~ Title District Petroleum Engineer
Tho bolo~ fo ission uso~
Con--ns of Approval, if ang:
By Order of
Approved by COMMISSIONER the Commission Date__
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
October 12, 1983
~r. Gary Plisga,
District Field Engineer
Sohio Alaska Petroleum. Company
Pouch 6-612
Anchorage, Alaska 99502
Re.- Subsequent Reports, Sundry ~otices and
Reports on Wells (Form 10-403)
Dear Mr. Plisga:
For the following list of "~otice of Intention To:" Sundry ~otices
and Reports on Wells (form 10-403) this office does not have on
record the "Subsequent~Report of:" de£ining the action taken on
the approved intention. .Please advise thisoffice by Subsequent
Report of the disposition of the intention.
Wel 1 Sohio Date
~rief_ De~¢ript:i_on.~of~ !ntent~ion
B-11 06-22- 81 ~eper rotate
~J,~ 2-~ 06- 29- 82
Installation o~ "K# valve.
~'- 16 10-13- 82 ~e r forat e.
F-17 11-11-82 Perforate.
R-3 11-11-82
Convert to Produced water
injection well.
LCS/JKT: lc ~ 105:D7
SOHIO ALASKA PETROLEUM COMPANY
S¥0
ARCO - ~: '"
CHEVRON
EXXON.
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE {907) 265-0000
:
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99 502
TO: SFO/UNIT/STATE:
GETTY
(-Marathon) MOBIL
PHILLIPS-..,..,
BPAE (Transmittal Only)
CENTRAL FILES(CC#'s-Transmittal Only)
Date: 2/11/83
Trans.#: -
CC#: 56134
REFERENCE:
,, ~HIO CASED HOLE FINAL LOGS
~T"~e following material is being submitted he'rewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
G-14 Spinner 1/17/83 #1 9100-9750 GO 5"
G-15 Spinner 1/20/83 #1 9750-10120 GO 5"
J-2 Spinner 1/15/83 #1 9800-10200 GO 5"
G-4 Spinner 1/31/83 #1 9950~10300 GO 5"
A-21 BH Audio Tracer 2/1/83 #1 2500-4000 GO 5"
4/82)
RECEIVEO
DATE ......
Victoria ALdriage
Development Geology
com.m B J Records ~1-5
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
To: SFO/UNIT/STATE:
(-Marathon)
GETTY
MOBIL
PHILLIPS
· - BPAE (Transmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
3~ ~ ~ "c" S]nEET
ANCHORAG£. ALASKA
TELEPHONE 19071 265-0000
MAIL: POUCt4 6-612
ANCHORAGE. ALAS~'A 99502
Date: 1-26-83
Trans. #: 3068
CC/!: 56068
/---~SD~HIO FIN__ .AL__ DATA - P__~SSU~ SURVEY~ DATA
~'"" ~he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
F-18 ,. BHPD (CORRECTED COPY)
Getty State ~;1v Pressure Survey
MPC 22-11-12:
G-15w
G-17 .J
F-14
X-3 ~' " "
C-2 ~' " "
B-2 / " "
C'8/'' " "
G-14~' _ " "
J-2 w/ " "
Pressure Survey.
Pressure Survey
Pressure Survey & BHPD
I! II
12/19/82 Sch
1/4/83 Otis
1/2/83 Otis
12/31/82 Otis
11/28/82 GO
12/9/82 Otis
12/1/82 Camco
11/22/82 GO
11/16/'82 GO
11/19/82 Sch
1/18/83 GO
1/16/83 GO
'82)
RECEIVEO
DATE
Karem Venn
Development Geology
Well Records
CHEVRON
IELEPHONE [9071 265-0000
MAIL: POUCH 6-6'12
ANCHORAGE, ALASKA 99502
EXXON
GETTY
~o: SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
BPAE (Transmittal Only)
CENTRAL FILES (CC#' s-Transmit tal Only)
Date: 8/10/82
Trans. #: 2510
CC#: 55510
REFERENCE:
IO CASED HOLE FINAL LOGS
T'"~-e following herewith. P~ease acknowledge receipt by signing a
material
is
being
submitted
of this letter and returning it to this office:--
H-13 EPL Sch 6/4/82 #1 5"
~_~ J-2 . EPL Sch 6/29/82 #1 5"
E-2 CNL Sch 5/23/82 #10 5"
32)
RECEIVED
DATE
STATE OF ALASKA
ALASKA ([ . AND GAS CONSERVATION C~ MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL ~ OTHER []
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska
4. Location of Well
At surface:
1245' WEL, 1080' SNL, Sec.
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 57.33' AMSL
99502
12.
9, TllN, R13E, UPM
7. Permit No.
69-97
8. APl Number
50- 029-20023-01
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
J-2 (23-10-11-13)
11. Field and Pool
Prudhoe Bay
J 6. Lease Designation and Serial No. Prudhoe Oil Pool
ADL 28281
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] - Perforations [] Altering Casing []
Stimulate i-I Abandon ' [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made ~ Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting
proposed work, for Abandonment see 20 AAC 25.105-170).
In the course of working over Well $-2 to replace damaged thermocase casing, a leak in
the 9'5'/8" casing was discovered at 3600'. A pipe analysis log indicated thin walls at
four locations from 3576' to 9017'. The leak was squeezed with 400 sks cement. A full
string of 7" 26# IJ4S casing was run from 9300' to surface and cemented in two stages
with 410 sks around the shoe and 190 bbls. Arctic Pack + 1.18 sks cement through the DV
at 4019'. 4 1/2" tubing without gas lift mandrels was run with a 7" x 4 1/2" packer set
at 9211'. The workover was. completed on July 7, 1982.
JUL 2 0 1982
Alaska 0ii & Cas Cons. Commission
Anchorage
14. I here,~/\, ~, _ correct, to the best of my knowledge.
Signed U Title District Drilling Engineer
below for Commission use
The space R.H. Rei~y
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
July 15, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
Well J-2 (23-10-11-!3,) ~Bp
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our subsequent
report of repairs made on this well.
RHR:JM
Enclosures
cc: Well File #17
Yours very truly,
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
·
Sohio Alaska Petroleum .Company 69-97
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20023-01
4. Location of Well
9. Unit or Lease Name
Prudhoe Bay Unit
At Surf ace:
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 57.33' AMSL
6. Lease Designation and Serial No.'
ADL 28281
10. Well Number
J2 (23-10-11-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
('Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] - Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
After completi.on.~of the work,~over, the well will be completed with an Otis "K" valve
being .utilized for downhole safety. This safety Valve will allow maximizing of
hydraulics and production. The installat.ion of the "K" valve for downhote safety was
verbally approved by Mr. C. V. Chatterton through Mr. Jim Trimbal on June 25, 1982.
J [J L - 2 i982
14. I her y t at e g ng is true and correct to the best of my knowledge.
Sign~2/-"~l"]~L4~-~~~ Title District Field Engineer
The(sp~ce b;low for\Com mission? - ~- ~~ us~-
Conditions of AP"l~val, if any: :
Alaska Oil & Gas Cons, Commission
Anchorags
Approved by
Approved Copy
Returned
COMMISSIONER the Commission
Date
Date
Form 10-403
Rev. 7-1-80
Submit "1 ntentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
June 28, 1982
Alaska Oil and Gas' Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
·
Gentlemen:
Well J-2 (23-10-t1-t3) PBU
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our proposal to
install a "K" valve for downhole safety.
L~ C. J. ~isga
District Field Engineer
GJP:JLH:ybr
Enclosures
cc: J.D. Hartz
Geology
Well File #17
ECEIYED
A!aska 0/1 & Gas Cons. Commission
STATE OF ALASKA
ALASKA O1(..... ,ND GAS CONSERVATION COI~ .ISSlOU
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER I-'1
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska
99502
4. Location of Well
At surface:
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 57.33' AMSL
6. Lease Designation and Serial No.
ADL 28281
7. Permit No.
69-97
8. APl Number
50-- 029-20023-01
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
J-2 (23-10-11-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] , Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [~ Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
This is a resubmittal of a Sundry Notice originally issued in May, 1981.
was postponed and is-now' scheduled to commence approximately May 5, 1982.
program isas-folloWs':
The workover
The workover
1. Move in rig and kill well with. 9.0 ppg. NaC1.
2. Pull existing tubing and thermocase.
3. Clean out to PBTD at 10355~.
4. Run 5 1/2" tubing with_ 8 5/8'" x 5 1/2" thermocase and gas lift equipment. Change
well over to diesel and move rig off.
;
RECEIVEO
Subsequent Work Reported
APR 0 21982
Nask~ 0il & Gas Cons. C0mmissi0~
fach0raga
14. I hereby certify that the f~oij3_q is tr~je~and correct to the best of my knowledge. ,
Signed Title District Drilling Engineer
The space below for Commission use R. H_. R~y'
Conditions of Approval, if any: '~
By Order of
Approved by COMMISSIONER the Commission Date__
Form 10-403
Rev, 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
March 30, 1982
Mr. C. V. Chatterton
ALASKA OIL & GAS CONSERVATION COMM.
3001 Porcupine Drive
Anchorage, AK 99501
Re: Well J-2 (23-10-11-13)
Dear Mr. Chatterton:
Enclosed in triplicate is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named Well. This contains our proposal
to repair the Well.
Sincerely,
cml
Enclosures.
cc: Well File #17
District Drilling Engineer
RECEIVED
APR 0 2 1982
Alaska 0ii & Gas Cons. Commission
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
· May 28, 1981
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well J-2 (23-10-11-13)
Enclosed, in triplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This contains
our proposal to repair the well.
RHR:ja
Enclosures
cc: Well File #17
Yours very truly,
R. H. Reiley
District Drilling Engineer
RECEIYEO
MAY 2 8 1981
Oil & Bas Cons. Commission
/~chorage
(~ STATE OF ALASKA (~i.
ALASKA ,L AND GAS CONSERVATION C ,MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL I-I
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 69-97
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20023-01
4. Location of Well
At surface:
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
6. Lease Designation and Serial No.
ADL 28281
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 57.33' AMSL
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
J-2 (23-10-11-13)
11. Field and Pool
Prudhce Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] , Perforations [] Altering Casing r'-!
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The 8 5/8" x 5 1/2" Thermocase is deteriorating resulting in difficulty removing the
downhole safety valve.. A workover is planned and the program is as follows:
.
2.
3.
4.
Move in rig and kill well with 9.0 ppg. NaC1.
Pull existing tubing and Thermocase.
Clean out to PBTD at 10355'.
Run 5 1/2" tubing with 8 5/8" x'5 1/2"_ Thermocase and gas lift equipmen~?ch'ange we!'..1
over to diesel and move rig off.
The workover is scheduled to start June 5, 1981.
RECEIVED
MAY 2 8 ]98]
Alaska 0il & Gas Cons. COmmission
Anchorage
Signed~' ~ ~:~'~ ~[_~ "~'-~ Title District Drilling Engineer
The space below for Commission use R. H. R~.~ey
Conditions of Approval, if any:
Date
Please notify the Commission so that a representative my be present to witness the
initial testing of BOPE before downhole work ccmmences. Approved opy
Approvedby BY [0N~[[ C. SU[~R COMMISSIONER t eCo 's'o y~'~,~,~f Date
Form 10-403 7 'Y~ buum-it "Intentions" in Triplicate
Rev. 7-1-80 and "Subsequent Reports" in Duplicate
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
AEC0
To:EXXON
PHILLIPS
SF0
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265~0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
8/22/80 ¢'/323
REFERENCE:
SOHIO MAGNETIC TAPES
jcThefollowing being acknowledge receipt by signing a
material
is
submitted
herewith.
Please
opy of this letter and returning it to this office:-
C-9 Magnetic Tape 5/28/80
" " 5/29/80
Magnetic Tape 6/4/80
Carol Krieter
Well Records
¢/60570
¢/60565
f/60574
ir' "t 'CalMa
'
;~ I-"R~§~
SOHIO PETROLEUM COMPANY I j-- ~ G//f~ ~J,~' STREET
Division of Sohio Natural Resources Company I ..... I 3 ~:,: ANC'--' i- ORAGE ALASKA
I .... , .... .- ---1 '
MOO -:- --: POUCH
SOHIO-BP ALASKA PRODUCTION DIVISION C _.i~v~ . t ..... r- .,
...... - ~ , :~. ~lbHp_qA~E, ALASKA
· ' ' EX~a~ ............ - '~--i .~T,.'mr~c I
- -~-' ' C ' ~ --
,, ~ I ~T.,TT:C--J
I'CO'N FE RT~'~ 8 226
TO:
S~O/~ZT/STA~ ~ - - - ~-~, z .... :.6~[ 0 #
. ; KILF;
~hl _ _ ,.. _ .. ~ !
:FO/UNIT/STATE
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
//~he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
B~8 CNL 5/22/80 #2 .. 5"
C-3 CNL 5/28/80 #1 5"
C-8 CNL 5/25/80 #3 5"
C-9 CNL 5/28/80 #1 5"
D-5 CNL 5/30/80 #2 5"
E-2 CNL 5/25/80 #6 5"
E- ,~\ CNL 5/29/80 #2 5"
, X~ CNL 6/04/80 #3 5"
- CNL 5/24/80 #5 5"
N-5 CNL 5/31/80 #2
N-6 CNL 5/26/80 #2 5"
Q-2 CNL 5/23/80 #1 5"
Q-7 CNL: 5/23/80 #1 5"
R-6 TDT-M 5/16/80 #2 5"
Well Records
Redi-Kwik, Quality Litho
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO: State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Dr.
Anchorage, AK 99504
Attn: Mr. H. Hamilton
REFERENCE: Well Data Transmission
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH ~612
ANCHORAGE, ALASKA 99502
DEV-PB-250/8
December 27, 1978
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
1 'sepia and 1 .pr.int f_or the following Sohio .0.perated wells:
J-2 Temperature Log Run 1 5"
E-2 Spinner Log Run 1 5"
RECEIVED
'JAN
Division of 0il & Gas C0ns~a~;0n ----.:_.~ Anch3mfle ...
C~lette Tracy
Well Records
RECEIVED
DATE
SOHIO PETROLEUM COMPANY
[7! ' ' - -· ~ ,rural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Department of Natural Resources
Divison of Oil & Gas Conservation
3001 Porcupine Dr.
Anchorage, AK 99501
Attn: Mr. H. Hamilton
31i~ "~"
A..~;,-.,~ .-.,~G &, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
DEV-PB-250/8
November 17, 1978
REFERENCE: Well Data Transmission
The following material is being submitted herewith. Please acknowledge receipt by signing
copy of this letter and returning it to this office:-
1 print and 1 sepia for the followin~ wells:
F-3 ~CNL Run 3 5"
B-4 ~L Run 2 5"
~Prod. Log Run 1 5"
~FT Run 1 5"
~CNL Run 2 5"
D-1 ~NL Run 1 5"
/'~i= ~,,~ ~--- ~ ~ 5"
FDC Run 1 2"
;-"'~IL Run 1,2 2"
...
~ ~ll -
c q Il
j~. .... C';. ri"
Colette Tracy
Well Records
SOHIO PETROLEUM COMPANY
..Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Department of. Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attn: Mr. O.K. Gilbreth Jr.
.3111 "C" STREET
ANCHOR,'SE. ALASKA
TE LEPHO;,; ~.
MAIL: P. C,. [gOX 4-137~3
ANCHORAGE, ALASKA 99,509
Dev-PB-250/8
April 18, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
Spinner ..Surv.e. ys
H_2
H_5C-~
H_6~/
H-7
J-8~
j-9~
M-3~'
M-4~
N_5~'
N_6~--
for the following wells:
Wel~ Records
RECEIVED
DATE
19
BP ALASKA INC.
31 ! 1 - C - STREET · TELEPHONE (907) 279-0644
G-3 (12-11-13)
TDT-K
TDT-K
H-2 (21-11-13) CNL
H-3 (22-11-13) CNL
J~0-11-13) CNL
J-5 (03-11-13)
M-4 (31-12-13)
CNL
GR/CCL
HRT
N-5 (06-11-13) CNL
N-8 (07-11-13) CNL
1!
5"
5"
5"
5"
5'!
2" & 5"
2" & 5"
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
Page 2 of 2
12-4-76
11-12-77
6-18-77
6-28-77
8-6-77
7-5-77
11-22-77
11-21-77
5-21-77
5-13-77
//
Well Records ~
BP ALASKA INC.
3111 - C - STREET · TELEPHONE (907) 279-0644
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
00NF ,- NTI^L
August 22, 1977
CON F I DENT. I AL
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska .99504
Attention: Mr. Hoyle Hamilton,
Director
·
Gentlemen:
Well Numbers: H-7 (22-11-13)
H-6 (21-11-13)
(33-12-11-13)
(23-10-11-13)
J-1 (33-09-11-13)
Enclosed please find, in duplicate: Form 10-403, Sundry Notices and
Reports on Wells; and Form P-4, Mcnthly Report of Drilling and Workover
Operations, for the above named wells.
Very truly yours,
BP ALASKA INC.
smf
Enc lo sures
cc: Drilling Well Files
P.E. Well Files
H-7
H-6
G-3
J-2
J-1
Manager Operations
i ',i !
Form ! 0-403
REV. 1-1 (k73
Submit "1 ntentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to ~leepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
OIL ~ GAS r-'l
WELL I~1 WELL OTHER
NAME OF OPERATOR
BP Alaska, Inc.
3. ADDRESS OF OPERATOR
P.O. Box 4-1379
4. LOCATION OF WELL
At surface
1245' W-EL, 1080'
CONFIDFNTIAI
Anchorage, Alaska 99504
SNL, Sec..9, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, ets)
KBE '57.33
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20023-01
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28281
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Ba7
9. WELL NO.
J-2 (23-10-11-13)
10. FIELD AND POOL, OR WILDCAT
Pr~dhoa B~v_ l=m,dh~ Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
~ec. 10, TllN, R13E, UPM
12. PERMIT NO.
69-97
)oft, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PI.~NS
SUBSE(~UENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SNOOTING OR AClDIZlNG ABANDONMENT*
(Other)
(NOTE; Report results of multiple completion on Well
C~ml~lltlon Or ReCOmpletion Report and LOg form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all I~®rtln®nt ~letalls, ancl give pertinent dates, including estimated (late of
starting any proposed work.
,:
The fOllowing intervals in this well were perforated on August 7, 1977.
The shot density was 4 W.P.F.
10007-10022 ft. BKB (Ref. BHCS/GR, 10-28-69)
10037-10046 " ( " )
10067-10082 " ( " )
10094-10114 " ( " )
10128-10143 " ( " )
Prior to perforating ran a cased hole Neutron Log.
Ran. temPerature survey.
After perforating ran and .set S.S.S.V. in nipple at 2012' BKB. Ran
pressure/temperature survey. The S.S.S.V. was closure tested on August 11, 1977.
The test was witnessed by a State representative.
16. I hereby certify that the foregoing is true arid correct
SIGNED ~'
(This space for StateUfflce use)
APPROVED BY ..
CONDITIONS OF APPROVAL, IF ANY~
TITLE .
DATE
See Instructions On Reverse Side
Form No. P-4
REV. 3-1-70
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIO
APl NUMERICAL CODE
50-029-20023-01
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28281
7.IF INDIAN-ALOTTEE OR TRIBE NAME
1. OIL [~ GAS O CONFIDENTIAL
WELL WELL OTHER
2. NAME OF OPERATOR " 8. UNIT FARM OR LEASE NAME
BP ALASKA, INC. PRudhoe Bay
3. ADDRESS OF OPERATOR
P.O. Box 4-1379 Anchorage, Alaska 99509
SNL, Sec. 9, TllN, R13E, UPM
4. LOCATION OF WELL
1245' WEL, 1080'
9. WELL NO.
J-2 (23-10-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 10, TllN, R13E, UPM
12. PERMIT NO.
69'97
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES 'USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
PERFORATING AND ASSOCIATED OPERATIONS JULY-AUGUST 1977
9 July Ran temperature survey.
11 July Tested tubing and annulus
12 July Tested tubing and annulus
6 August
Ran CNL/GR/CCL. Perforated the following intervals at 4 S.P.F. using
Schlumberger 2 7/8" Hyperdomes. 1'80° phasing:
~'~ ...... ~ ......... ~ .~ ~%.'
10007-10022 ft. BKB (Ref. BHCS/GR, 10-28-69)
10037-10046. " ( " )
10067-10082 " ( " )
10094-10114 " ( " )
10128-10143 " ( " )
The well was flowed for a short time before, during, and after each gun was
fired.to clear perforations.
8 August Ran and set S.S.S.V. in nipple at 2012' BKB. Recovered S.S.S.V.
Redressed and reran S.S.S.V. ,
11 August-Tested S.S.S.V., swab ~valve, master valve. Test witnessed by a
State representative. End. Of Operation The well was left with the S.S.S.V. closed
and with the wellhead valves closed. (Except the surface safety valve).
14-15 August Ran Sperry-Sun pressure/temperature survey.
14. I hereby certify that t~tr,ae and correctSIGNED TITLE ~P¢ DATE
NOTE-Report on this form is' required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
BP ALASKA INC.
3111 - C - STREET · TELEPHONE (907} 279-0644
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gent lemen:
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
August 16, 1977
Well Number J-2 (23-10-11-13)
Enclosed, in duplicate, is FOrm P-7, the Completion Report on the
above well, together with the Well History and Casing Record. This
well has been perforated and is ready for prOduction.
PRJ:ja
Enclosures
cc: Well File #17
Regina McGaffigan
Very truly yours,
BP ALASKA, INC.
?. R. Judd
District Drilling Engineer
I ATE
SUBMIT IN DUP~,-.. *
STATE OF ALASKA ~Se~ other In-
st ructions on
OIL AND GAS CONSERVATION COMMITTEE rever~e sitie~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
W ELL W ELL DR ¥ Other
b. TYPE OF COMPLETION:
WELl. OVER EN ~ BACK RESVR. Other
2. N&ME OF OPERATOR
BP Alaska, Inc.
3. ADDRES~ OF OPERATOR
P.O. Box 4-1379, Anchorage, Alaska 99509
4. LOC~.T~O.X oF WELL (Report location clearly and in accordance with any State requirements)*
xt~u~ac~ 1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
At top prod· interval reported below
1955' EWL, 3476' SNL, Sec. 10, TllN, R13E, UPM
A~ total depth
2071' EWL, 3521' SNL, Sec. 10, TllN, R13E, UPM
9-24-69 10/27/69_ _ 8-7-77 I KBE 57.33' AMSL
/
10420'MD 9213 TV 10350'MD 9121'TVD None
·
PRODUCING !M/~ERVAL($), OF THIS CO,~PIJETIO~--TOP, BOTTOm, NA~E (~D AND %~v-f))*
Top: 10007' MD 8809' TVD
Prudhoe 0il Pool:
Bottom- 10143' MD 8931' TVD
24. TYPE ELECTRIC AND OTHER LOGS RUN
DIL BHCS/GR, FDC, ML/I~L, SNP, LL3, CBL
~5. CASING ~ECOB. D (Report all strings set in well)
CA. SI2{G SIZE WEIGHT. DEPTIff SET (M~) I-.IOLlq SI~'.E
see at'
26. LINER RECOL{J~
28. PEP,~FORAT.[ONS OPF_aXl TO PRODUCTION' (Interval, size and number)
!10007'-10022' BKB @ 4 spf 0.5"(ref BHCS/GR
~ 10037'-10046' " " ( " 10-28-69
510067 '-10082 ' " " ( " "
d 10094 ' -10114 ' " " ( " "
":10128'-10143' ~' '~I o'~'7 ,, ( ,, ,,
30. Pt%ODUCTION
CONFID[NTIAL
5. API NLrM.ERICAL CODE
50-029-20023-01
6. LEASE DESIGNATION A-ND SERIAL NO.
ADL 28281
7. IF INDIAN, A.LLO/q'EE OR TRIBE NAALE
8. UNIT,FA_R/VI OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
J-2 (23-10-11-13)
10. FI-ELD AND POOL, OR WILDCAT
?rudhoe Bay,Prudhoe 0il Poc
11. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Sec. 10, TllN, R13E, UPM
12. P~IT 1~O.
69-97
RT, GR, ZTC)eJl?. ELEV. CASINGHEAD
37.33' AMSL
INTERYALS DRILLED BY
Total
CABLE TOOLS
23. WAS DIRECTIONAL
SURVEY 1VIAD E
Yes
DATE FIRST PRODUCTION
DATE OF TEST, I-7/OURS TESTED 'IC~-~OXE SLZE JPROD'N FOR
31. ~SPOSnUON O~ ~S (8otd, u~ed ~or tuel, vented, etc.)
I PIiODUCT10.N
MEII{OD (Flowing, gas lif~, pumping size and type of pump)
!VTELL STATUS (Producing or
~nuL-in)
oIL--BEL.
GAS--NfCF.
32. LIST OF ATTACHMENTS .~3~;; ·
~ Well History, Casing Record
33. I h.reb~- certify that the foregoing and attached information is complete and correct as determtne~ ~f~r
S,GNEb (~~ ~ ~0/' T~TLE District Drilling Engineer D~TE
- P. R. 3udd
IIIlllll I Ill
·(See Instructions and Spaces [or Additional Data on Reverse Side)
27. TUBING RECOI%D
SCi%EElXl (~fD) SIZE J DEPTH SET (MD) ~ PACICER SET (~/ID)
5%" ] 9330' "~ 9346'
8-5/8"x5~1/2" Thermoca e%?'1977 to
_
29. ACID, Si!OT, FZi.~CT~RE, C~IE:NT SQUEEZe, ETC. surface
D~T%i INT~V.~ (MD) ~ AMOUNT C~D I'2!ND OF MA%'EP~AL US~
CEAILNTING RECOI~ Ak~OUNT PULLED
INSTRUCTIONS
General: This form is designed for submitting a complete and correct wett completion report enc~ log on
all types of lands and leases in ,~,laska.
Item: l&: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
ments given in cther spaces on this form and ~n any attachments
Items 20, ,~nd :22:: If this well is completed for separatc production from more than one interval zone
(multiple completion), so state in item 20, and in item 22 show the prcJucing interval, or i~_tervais,
top(s), bottom(s) and name (s) (if any) for on y the interval reported in item 30. Submit a separate report
(page) on this form, adequately identified, for each addilional interval to be seperately produced, show-
ing the adtditional data pertinent to such interval.
ll~2&: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate complelion report on this form for each interval to be separately produc~l.
(See instruction for items 20 and 22 above).
34. SUMMARY OF I~ORMATION TESTS 1NCLUDIN¢; INTERVAL TESTED, pHEF~SUHE DATA. ~ ~OV~I~ OF OIL. GAS,
~. G~IC MAR~
WA~ AND MUD
~: B~ Subsea
~ Sag River 9506 ' 8356
Shubl~k 95~1
Iv~shak 9617
- .
02-001 B
STATE
of ALASKA
TO: [--
DEPARTMENT OF NATURAL RESOURCES
Divisi~n of ~il and Gas Conservation
O. K. Gilbreth,
Director
FROM:
Hoyle H. Hamilton ~.f999~
Chief Petroleum Engineer
Harold R. Hawkins
Petroleum Inspector
DATE :
SUBJECT:
August 18, 1977
Witness Tests on Surface Safety
Valves and Surface Control Subsurface
Safety Valves, BP ef ~a
Pad and Well No. J-l~ J-2,3~-3,
G-3, E-3, H-4, H-6
_Tuesday, August 9, 1977 - I left Anchorage by BP charter by Alaska Airlines
at 12:20 PM. I arrived at Prudhoe Bay at 2:30 PM. Purpose of trip was to
witness the tests of surface safety valves and surface control ~ subsurface
safety valves for BP .~ Alaska.
I met Mack Hernandez, chief operator for BP, and Ted Stagg, .operator for BP,
and Ale Lawton, wireline coordinator for BP, with whcm I am to witness the
teSts with. Mack Hernandez infOrmed me that tt~ey w~re having problems .with
a couple producing wells, H-8 and N-l, and tests would be.delayed. In the
meantime I checked'out a diverter system for~Gulf Oil McIntyre Point #1.
~.edpesday, August 10, 1977 - All the operators worked all night on H-8 and
found that the 7" tubing was collapsed around 5300 feet.· This well produced
about 17,500 barrels.
Thu~r~ s.day, AUguSt 11, 1977 - I went to the field today with Ale Lawton and
Ted Stagg to start tests on SSV and SCSV's. J-l, J-2, F-3, G-3 ~and E-3 all
tested satisfactory with no leakage.
.F.r..i~day, August 12, 1977 - Tests started at 8:00 AM. Ale Lawton and a new
operator, Cecil Chittnan, took me to H-pad. The SSV and SCSV on H-4 tested
satisfactory. The SSV on H-6 tested OK. But the SCSV did not test. A
field report was made out on all of ~these jobs separately and one copy of
each was given to Mack Hernandez, chief operator in field and production.
In sunm~xT: I witnessed the tests for BP of Alaska on J'l, J-2, F-3, G-3,
E-3, H-4 and H-6. All tests~were satisfactory with one exception, the surface
0.,';/~ - .
control subsurface safety vale~^w~lch leaked.
Attachment
BP is to call us back to witness test~, g of H-6 when repaired.
Drlg. Permit No.~7
Operator~,~ ~)F
Ala~ Oil and Gas Conservation Commit~
Field Inspection Report '
Well/Platfm Sec~ T//~ R/~£,~_M
Represented by _T~z:/).~~ Name & Number
Satisfactory Type Inspection
Yes No Item ( ) Location,General
() ()
() ()
() ()
() ()
(~ ()
(X) ()
() ()
() ()
() ()
() ()
Satisfactory Type Inspection
Yes No Item ( ) BOPE Tests
1. Well Sign
2. General Housekeeping
2. Reserve Pit-( )open( )filled
4. Rig
~)~) Safety Valve Te.s_ts
() ()
() ()
() ()
(.) ()
() ()
15. "Casing set @
16. TesL fluid-( )wtr.--7-~ )mud ( ) oil
17. Master Hyd. Control Sys.- psi9
18. N2 btls. ,__,__, psig
19. Remote Controls
5. Surface-No. Wells ~
6. Subsurface-No.. Wells /
( ) Well Test Data
7. Well Nos. , , ,
8. Hrs. obser , ,
9. BS&W , , ,
10. Gr. Bbls.
( ) Final Abandonment
( ) ( ) 20. Drilling spool- "outlets
( ) (). 21. Kill Line-( ) Check valve
() ()
() ()
() ()
() ()
() ()
() ()
22. Choke Flowline ( ) HCR valve
23. Choke Manifold No. valvs fl~s
24. Chokes-( )Remote( )Pos.(-~dj]
25. Test Pluo-( )Wellh.d( )csg( )none
26. Annular Preventer,psi~
27. Blind Rams, psi~
( ) ( ) 11. P&A'Marker · ( ) ( ) 28. Pipe Rams __psiq
( ) ( ) lZ. Water well-( )capped( )plugged ( ) (') 29. Kelly & Kelly-cock psi~
( ) ( ) 13. Clean-up. . ( ) ( ) 30. Lower Kelly valve
( ) ( ) 14. Pad leve/e~ ( ) ( ) 31. Safety Floor'V~lves-T(--3-BV ( )Dart
~days Tota
Total inspection observ~ation time ~ 1 number leaks and/or equip, failures
Remarks ._~i~- ~ b/ ..~/,,~7- ~ .7- ~ ~ ~_. ,/ ,,~ ,/~,7" ~,~Z=x~H~ ?~ /~m_~ ._~Z . .~
CC'
Notify in days or'when ready
Inspected by~'_~,~/~f',~.~.( · Date
BP ALASKA iNC.
3111 - C - STREET · TELEPHONE {907) 279-0644
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
July 7, 1977
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of,Oil andGasConservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
Well.Number BP J-2 (23-10-11-13)
Enclosed, in duplicate, isForm P-.4, Monthly Report of Drilling and Workover ..
Operations for the above described well for the month of June.
veer~y truly yours,
PRJ:jle
BP ALASKA INC.
District Drilling Engineer
Enclosures
cc: Well File #17
3Yk ' 8 1977
Division cf Oil ~n~:i ~$F~- (:,og~p~tio:~
l'~rm ~o. P--4
I~L'V, ~- 1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
WKLL WIJLL
2. NAME OF OP~LTOR
BP Alaska Inc.
3. azrock-ss oF
SUBMIT ]~ DU~LICAT~
P. O. Box 4-1379~. Anchorage; A]as~m qqS~q
4. ~OCA~ON OF W~
At Surface:
AP1 NUA{ERICAL CODE
50-029-2QQ2~-01
LEASE DESIGNATION AND SEI~IAL NO.
ADL 28281
'? IF INDIAN. ALRDi i~-~ OR TRIBE NAME
i 8. I~.'IT F.~ OR LEASE NAME
Prudhoe Bay Unit
9 w?_.,~. NO
10 FLELD A_ND POOL. O1~ WILDCAT
Prudhoe Bay, Prudhoe Bay Pool
11 SEC, T.. R.. M. (BOTTOM HOLE
o~
Sec. 10, TllN, R13E, UPM
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
12. PIeR,MIT NO
69-97
13. REPORT TOTAL DEPTH AT END OF MONTH, CH.~NGES IN HOLE SIZE, CASING AND CL~VIENT!NG JOBS INCLUDING DEPTH
SET AND VOLLTMES USED. PERFORATIONS, TESTS A/%TD RESULTS FISHING JOBS JI/NK IN HOLE AND SIDE-TI~CKED HOLE
A2CD ~NY OTHER SIGNIFICANT CI-La~NGF~5 IN HOL~ cOBrDITIONS
June, 1977
Fished for and recovered packer and tailpipe. Pressure tested casing and found
D.V. collar open at 6492'. Unable to close D.V. Squeezed D.V. four times with
a total of 300 sacks of cement. Tested squeeze to 2500 psi okay. Set production
packer at 9348'. .Ran 29 joints 5-1/2" 17# .controlled yield N-80 8RD A/B modified
tubing, 218 joints 5-1/2" 17# L~80 Atlas Bradford IJ-4S tubing,'and 52 joints
8-5/8" x 5-1/2" Thermocase I. Displaced tubing to diesel and landed tubing with
ball valve nipple at 2012' and bottom of Thermocase I at 1977'. Installed wellhead.
Ran dummy gun 'to 10350'. Set BPV. Released rig at 24001hours 6/12/77.
RECEIVED
JUL - 8 1977
14. I hereby cert correct
mG~D ~- -z,,~-~-F,-- -~- v· 'n'r~ District Drilling _E__ngine~A~ 7 ....
NOTE--Report alt this form ii required for .lOCh calendar month~ regardless of the status of operations, ofld must I~ filed *in duplicate with the
oil and gas conJervation committee by the 15th of the succeeding month, unless otherwise d~rected.
BP ALASKA INC.
STREEt · tELEPHONE {907} 279-0644
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, AK 99504
Attention: Mr. Hoyle'Hamilton
Director
Gentlemen:
Well No's J-1 (31-09-11-13)
(~~23-10-11-13)
3-3 (23-04-11-13)
J-5 (23-03-11-13)
MAILING ADDRESS:
P.O. 80X 4-1379
ANCHORAGE, ALASKA 99509
July 1, 1977
2
3 ENG
4
,5 ENG~
1 GEOL
............
2 GEOL
.........
3 GEOL
R~V
DRAFT
saC
CONFER:
.....
FILE:
Enclosed please find, in triplicate Form 10-403, Sundry Notices for
Perforating Wells J-l, J-2, and J-5 ~nd for reperforation of well J-3
if required.
GP/dmd
Very truly yours,
BP ALASKA INC.
G D Tayl r
~anager Operat±ons
RECEIVED
Form 10-403
REV. 1-10-73
' Submit "lntentlor, s" In Triplicate
& "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not'use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
5. APl NUMERICAL CODE
50-029-20023-01 " - ~-
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28281
WELL L.,~J WELL
2, NAME OF OPERATOR 8. UNIT, FARM OR LEASENAME
BP ALASKA INC. PUT RIVER
3. ADDRESS OF OPERATOR 9. WELL NO.
P. O. Box 4-1379, Anchorage, AK 99509 J-2 (23-10-11-13)
4. LOCATION OF WELL
At surface
1245' WEL, 1080'SNL, SEC 9, TllN, R13E, UPM
lO. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
SEC.10, TllN, R13E, UPM
12. PERMIT NO.
69-97
~ort, or Other Data
13. ELEVATIONS (SHOW whether DF, RT, GR, etc.)
KBE 57.33' AMSL
Check Appropriate Box To Indicate Nature of Notice, Re
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERI'NG CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form,)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
The following intervals in this well will be perforated (at 4SPF) for production
10007-10022 ft.. BKB (15') (ref BHCS/GR 28 October 1969)
10037-10046 " (9') ( " )
10067-10082 " (15') ( " )
10094-10114 " (20') ( " )
10128-10163 " (35') ( " )
After perforating operations a static bottom hole pressure survey will be con-
ducted. The well will be-left with a SSSV in the nipple at approximatel'y 2000
ft. BKB. 'RECEIVED
The work will be done in July, 1977.
JUL - 5 197.7
Division of Oil and (,a,, Coll::;~.:tv ~',
I hereby certify that the foregoing Is true and correct
APPROVED BY .r'~~
CONDITIONS O~FAPPROVAL, IF~A~INI'Y'~-
TITLE
, .
T IT LE DATE
See Instructions On Reverse Side
Approved Cop,/
Reiurned
,,,
BP ALASKA INC.
3111 - C - STREET · TELEPHONE {907) 279-0644
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
June 10, 1977
CONFIDENTIAL
State of Alaska
Department of Natural Resources'
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention:
Gentlemen:
Mr. Hoyle H. Hamilton
Director
Well Number BP J-2 (23-10-11-13)
Enclosed, in duplicate, is Form P-4, Monthly Report of Drilling and Workover
Operations for the above describedwell for the month of May.
Very truly yours,
District Drilling Engineer
PRJ:jle
Enclosures
cc: Well File #17
F~rm No. P--4
~V. ~- 1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1.
WELL WgLL
2. ~.~ME OF OPEP,.ATOR
BP Alaska T~c.
P. O. Box 4-1379, Anchorage, g~_aska 99509
4. LOCATION OF WTM
At Surface:
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
SUBMIT IN EFt.rPLICAT~
APl NU~.~ERICA.L CODE
50-029-20023-01
LEASE DESIGNATION AND SERIAL NO.
ADL 28281
IF INDIA]~. ALO7 ikE OR TRIBE NAME
8. L.~IT F.~RA~I OR LEASE NAME
Prudhoe Bay Unit
9 WF.I~L %'O
J-2 (23-10-11-13)
FIELD AND POOL, OR WILDCAT
Prudhoe Bay,. Prudhoe 0il Pool
II SEC, T.. R.. M. (BOTTOM HOLE
o~
Sec. 10, TllN, R13E, UPM
12. PER,MIT NO
69-97
13.REPORT TOTAL DEPTH AT END OF MONTH, CHAIWGES IN HOLE SIZE, CAS1NG AND C~ViENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOB~ JLq~IK IN HOLE AND SIDE-TRACKED HOLE
AND ANY O~IER SIGNIFICANT CHANGES IN HOLE CONDITIONS
May, 1977
Accepted rig 1800 hours, May 18, 1977. Displaced diesel to CaC12 to 2079'. Dressed
13-3/8" stub at 905'. Ran 23 joints 13-3/8" 72# controlled yield N-80 Buttress tieback
string with Baash-Ross casing patch at 918'. Ran temperature survey. Arctic Packed
13-3/8" x 20" annulus.. Dressed 9-5/8" stub at 2047'. Ran 51 joints 10-3/4" 55.5#
controlled yield N-80 Buttress casing tieback string with 9-5/8" Baash-Ross casing
patch at 2053', 9-5/8" x 10-3/4" crossover at 2003'. .Ran temperature survey. Arctic
Packed 10-3/4" xl3-3/8" annulus. Drilled out cement plug and bridge plug at 2079'.
Cleaned out to 103~0'. Tested all casing strings to 3000 psi. Ran logs to 10350'.
Ran 5-1/2" tubing and 8-5/8"x 5-1/2" Thermocase. Packerdid not set. Pulled tubing
and Thermocase. Lost bands and control lines while pulling tubing. Left PBR and
packer assembly in hole. Fished out bands, control lines and PBR. Fishing for packer
at 2047'.
RECEIVED
JUN 11 1977
Division of Oil & ~as Conservation
Anchorage
14. 1 hereby certi colTe~
S,m:N'~ ~,,~ ~,.,F,,.~,.- L--- =TL~ District ........ Drilling EngineegA~, . 6~/~O,. ~,,/'~. '~'
NOTE--Report on this form is required for .each calendar month% regardless of the status of operations, and must I~ filed in duplicate with the
oil and gas conservation committee bythe 15th of the succeeding month, unless otherwise directed.
BP ALASKA INC.
311 ! - C - STREET · TELEPHONE (907) 279-0644
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
MAILING ADDRESS:
P.O. BOX 4-1379
November 2, 1976
Attention: Mr. Hoyle Hamilton
Acting Director
Gentlemen:
Well Number BP.J-2 (23-10-11-13)
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells,
for the above named well. This report contains our proposal to re-enter the
above well, to complete the well in preparation for production from the
Prudhoe Oil Pool.
Very truly yours,
BP ALASKA INC.
?. R. Judd
District Drilling Engineer
PRJ: j le
Enclosures
cc: Well File #17
~ Copy
Returned //~-
I
1-10.-73
Subml t "t nt,~';~tlon¢' i.q TrI¢tczta
& '~StibSoquer~t Reports" In F)~plicat¢
STATE OF ALASKA
O~L AND n~',S ,'~,,~"c,,, ~ ',",-,~
,~,, ~,u,~o,:,,~ ~-~, ~,, COMMITTEE
SUNDRY NOVICES AND REPORTS ON WELLS
(Do act use tills fo~m for prOL~OSats to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposa;s.)
O,L !Tq ¢.As F-]
WELL ~¥-.I WELL b..2 OTHER
NAME OF' OPERATOR
BP Alaska Inc.
ADDRESS OF OPERATOR
P. O. Box 4-1379, Anchorage, Alaska 99509
4. LOCATION OF WELL
At surface
1245' WEL, 1050' SNL, Sec. 9, TllN, R13E, UPM
13. ELEVAT tONS (Show whether DF, RT, GR, et~)
KBE 57,,33' AMSL
14.
Check Appropriate Box To indicate Nature of Notice, Re
APt I',;',JMEP. ICAL CODE
50-029-20023-01
LEASE DESIGNA'TION AND SERIAL
ADL 28281
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Put River
9. WELL. NO.
~-2 (23-i0-i1-13)
10. FIELD AN[) POOL, OR WILOCA-F
Prudboe Bay, Prudhoe Oi! Pool
11. SEC., T., R., M., (BOT-FOM HOLE OBJECTIVE)
Sec. 10, TllN, R13E, UPM
12. PERMIT NO,
69-97
)crt, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE AE~ANDON* SHOOTING OR ACIDIZING ABANDONMENT*
REPAIR WELL CHANGE Pt_ANS (Other) . ·
(Other) Complete (NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form,)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and 9ive pertinent dates, including estimated date of
starting any proposed work.
,.
We propose to re-enter the above well approximately January.4, 1977, to complete the
well in preparation for production from the Prudhoe Oil Pool as per the following program:
1
I
Patch back 13-3/8" stub with 72# controlled yield N-80 Buttress casing and
Arctic Pack Annulus.
~/~ ¢
Patch back 9-5/8" stub and tie back with 10-3/4" 55.5#~casing, Arctic Pack
Annulus.
3. Complete with production packer on 5-1/2" L-80 17# tubing with
Xlines,5-1/2"wiiiThermocaSebe placed Onat toP.2000 '_+.A subsur face safety va lye, v zith du~i~[~o~
4. Change well over to diesel, install and test Xmas Tree.
p=o~osed perforations ~o be submf[ted b7 Su~d=7 ~otlce Eo folloN.
16. I hereby cer"'f~ foregoing is true. and correct
S I G N E O ~---~l~, ~-~
District Drilling Engineer
TITLE DATE
(This space for State office use)
~(~%?~'f~% sB (~ I~"' -~,F¢,~,PPROVAL.P~PROViL ~F~N~~ TITLE ~~~' , .. _ ......... DATE
L/ '
See Instructions On Reverse Side
Approved Copy
Returned
Form P--3
R.EV. 9-30-69
Smbrnit "Intentions" in Triplicate~(' .....
& "Subsequent Reports" in Duplil.
STATE OF ALASKA
OIL AND GAS CONSERVATION. COMMITTEE
SUNDRY NOTICES AND REPORTS ON WRLS
(Do not use this form for proposals to drill or to deepen
Use "APP].ICATION 'FOR ~'EB.I~IT-~'' 'for such'pi;o~osals.) ·
5. AP1 NUiW.F_,HICAL CODE
,, 50--029-20023-01
_
6. LEASE DEC:~GNATION A.ND SEHIA~ NO.
ADL 28281
1. ?. IF INDIA2I, ALLOTTEE OR TI~IBE NAME
0IL ~ GAS ~]
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT, FAJ:LiVi OR LEASE NAME
BP Alaska Inc. Put River
3. ADDRESS OF OPERATOR
P. O. Box 4-1379,. Anchora~e~ Alaska 99509
4. LOCATION OF WELL
At~urface 1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
9. V~I!ILL NO.
$-2 (23-10-11-13)
10. FIELD A~ID POOL, OR WILDCAT
Prudhoe Bay
11. SEC., T., R., M., (BOTTOM HOI..E
OBJECTIVE)
Sec. 10, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc. 12. PEHiVIIT 1~O.
69-97
,4. Check Appropriate Box To I,ndi,cate Niat'ure of N~ti'ce, Re ~orL or Other Data '
NOTICE OF INTENTION TO:
TEST WATER SHUT-Orr PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPI,ETE
SHOOT OR ACIDIZE J-- ABANDON*
REPAIR WELL CHANGE PLANS
~Other)
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~] REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ~ ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE I'nOPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
The' Well' was re-entered on October 8, 1972.. A 50 sack cement plug was
set' with the' top of the cement left at 2100 ft. A total of 2050 ft.
of 9~" casing and 908 ft of .13~" casing were recovered. The well
was displaced to diesel from 2083 ft. and the rig was released on
October 17, 1972.
See attached Diary of Operations for details.
OCT 2 7 1972
16. I hereby cert~ta t_he and correct
SIGNED ward
DIVISION OF: OIL AND GA9
ANCHO~.~
TITLE Manager (Operations)
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE DATE
See Instructions On Reverse Side
l~rm ~o. P--4
F.~V. ~- I-?0
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
WKLL W~:LL OTHER
~. NAME OF OP~%ATOR
BP Alaska Inc.
3. ADDRESS OF O~'ERATOR
P. O. Box 4-1379, Anchorage, Alaska
4. LOCATION OF WELL
At surface:
SUBMrr IN DUPLICA~' f
~ AP1 NUi~ERICAL CODE
50-029-20023-01
6 LEASE DESIGNATION AXD SEiqlAL NO.
ADL 28281
99509
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
IF INDIA)X. ALOTI'EE O]{ TRIBE NAME
8. L~IT F.~-tNI OR LEASE NAME
Put River
9 W~LL NO
J-2 (23-10-11-13)
10 FI3gLD A_ND POOL. OR %VILDCAT
Prudhoe Bay
I1 SEC , T.. R.. l~I. (BO'I~OM HOLE
o~
Sec. 10, TllN, ~3E, ~M
12 P~IT NO
69-97
13. REPORT TOTAL DEPTI-I AT END OF MANTIS, CHANGES IN HOLE SIZE, CASING AND C~WIENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED. PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TP~CKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS
October 8 - 12, 1972
Commenced operations at 0500 hours, October 8, 1972. Tested 20"
Hydril to 1000 psi. Ran in with 5½", 52" and 7½" swages to 210 ft.
Swaged-sa~" casing from 210 ft. to 775 ft. Ran in free to 2146 ft.
Displaced diesel with CaC12. Ran 8½" swage assembly and swaged
from 234 ft. to 693 ft., and ran in free to 2146 ft. Fished out
chain left from previous operations. Spotted cement plug with 50
sacks Permafrost II with 15 lb./sack Pozzolan. Slurry weight
14.6 ppg. Removed 20" Hydril and cut 9~" casing at 31 ft. Ran
dialog free point from 200 ft. to 1990 ft. Ran mechanical cutter,
a~" casing at 1903 ft , without success. Ran multiple
jars to cut -8 ·
511
string cutter and cut 9~ casing at 1905 ft. Pulled and recovered
casing.
October 13 - 17, 1972
Ran 4 arm caliper in 13~" casing. Ran dialog free point indicator
and CCL. Welded on 20" bradenhead and nippled up 20" Hydril.
Ran 12¼" x 10½" swaging assembly and swaged from 557 ft. to 561 ft.;
felt slight drag at 681 ft.; and ran in free to 1079 ft. Ran 12¼"
8!'' bit and dressed cement plug
bit to top of 9~" casing stub. Ran a
to 2100 ft. Ran 62" bit and drilled 20" rat hole in cement plug.
Cut, pulled, and recovered 9§" casing to 2050 ft. Cut, pulled, and
recovered 13~" casing to 908 ft. Ran 18½" bit to top of 132" casing
stub at 90.8 ft. Washed over 9§" casing to 2083 ft. with 11~" wash-
pipe. Circulated and displaced hole with diesel. Removed BOP,
replaced well cap and tested to 1500 psi. Rig released at 1400 hours,
October 17, 1972.
. :. ,
certif ' the ~oregoing is true and
14. I hereby ~ ~
iii ii ii i iii
NOTE--Report on this form is recluired for each calendar month,, regardless of the status of operations, and must bo filed in duplicate with the
oil and gas conservation committee by tho lSth of the succeeding month, ufllet8 Otherwise d~rected.
0 CT 7 197[
DIVISION OF OiL A~O GAS
Manager (Operations) DA~ ~aJ~'~ ~ ~7~
DIARY OF OPERATIONS
WELL NUMBER BP J-2 (23-10-11-13)
October 8 - 12, 1972
October .13 - 17, 1972
Commemcecl Ol:;.erat/ons'at 0500 h~, 0ctobe= 8,. 1972.~ Tested 20"
Hyd~l to 1000 psi. ~ in ~th 5}"-, 5~" md 7}" ~ag~ to 210
Swag~. .'9 }" c~ing from 210 ft. to 775 ft. ~-in free to 2146
Displa=~ ~esel ~ CaC12 . '~ 8}" ~age ~s~ly an~ swag~
from 234 ft. to 693 ft., ~d =~ ~ free to 2146 ft. Fished ou~
~a~ left from pre~o~ op~attons. Spo~te& c~ent' pl~ ~ 50
sa~s Pe~rost II with 15 lb./sa~ Pozzo~. Slur~
14.6 ppg." R~~ 20" Hyd~l and cut 9~" c~ing at 31 ft, ~n
dialog free .point from 200 ft. to 1990 ft. R~. ~'~ic~ cutter,
jars to cut 9~" c~ing at 1903 ft., wi~out Success. ~ ~ltipla
string cutter ~d cut 9~" cas~g at 1905 ft. Puled and rec~ered
'c~i~.
.
Ran 4 arm' caliper in 13}" .casing. Ran dialog free point indicator
and CCL." Welded ~ 20" bradenhead and nippled up. 20" Hydril.
Ran 12~" x 10~" swaging assembly and swaged from 557 ft. to 561 ft.;
felt Slight drag at 681 ft.; and ran in free to 1079 ft, Ran 12~"
bit to top of 9.~" casing stUb. Ran 8½" bit and dressed cemant plug
tO 2100 ft. Ran.6~" bit and drilled 20" rat hole in cememt plug.
Cut~ pulled, and recovered 9}" casing to 2050 ft. "Cut, pulle~, and
recovered 13}"' casing to 908 ft. Ran 18½" Bit to top of 13~" casing
Stub at 908 ft. Washed over 9~" casing to 2083 ft. with 11~" wash-
PiPe.. 'Circulated and displaced hole with diesel. ~emoved BOP,
replaced .well cap and tested to 1500 psi. FcLg release~ at 1400, hours,
October 17, 1972. '
·
1972
DIVISION OF OIL A~D ~,k";
BP ALASKA INC.
P.O. BOX 4-i379
311 ! - C - STREET
ANCHORAGE. ALASKA 99503
TELEPHONE (907) 279-0644
October 25, 1972
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr, Homer L. Burrell,
Director
Gentlemen:
WellNumber BP J-2 (23-10-11-13)
Enclosed herewith please find: Form P-3, Sundry Notices and
~ports on Wells in duplicate; Diary of Operations in
duplicate; and P-4, Monthly Report of Drilling and Workover
Operations in duplicate for the month of October, 1972;
for the above described well.
Very truly yours,
IBP ALASKA INC.
A. K. Howard
Manager (Operations)
vjp
Enclosures
cc: Operations Coordinator, New York
.- DIVISION OF
BP ALASKA INC
/ ~'
P.O. BOX 4-1379
31 1 1 - C - STREET
ANCHORAGE. ALASKA 99503
TELEPHONE (907) 279-0644
September' ~8,19 72
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell,
Director
Gentlemen:
Well Number BP J-2 (23-10-11-13)
Enclosed please find, in triplicate, Form P-3 Sundry Notices
and Reports on Wells, for the above named well.-.~i
Very truly yours,
BP ALASKA INC.
vjp
Enclosures
cc: Operations Coordinator, New York
G. D. Taylor
Manager (Operations) Acting
DIVISION OF OIL AND OAS
F~V. 9-30-69 ~ ~. & "Subsequent Reports" in Duplicate
STATE OF A~KA %. API N~C~ COD~
OIL AND GAS CONSERVATION CO~I~EE 50-029-20023~1
,
~ not use this fo~ for proposals ~ drill or to deepen ADL 28281
8. UNIT~
BP ~aska Inc. Put ~ver
9. ~L No.
3. ADDRESS OF OPERATOR
P 0 Box 4-1379, ~chora~e, ~aska 99509 3-2 (23-10-11-13)
4. LOC~T~O~ OF W~L ~0.
~t ~,-~¢~ Prudhoe Bay
11. SEC., T., R., M., (BOTTOM HO~
1245~ ~L, 1080' SNL, Sec. 9, TllN, ~3E, ~M O~E~VE~
Sec. 10, TllN, ~3E,
~:~ ~r.~VAT]~MR ~Rhmw wh~t.h~r D~ RT. GR. etc. 12. PE~T
KBE 57.33 AMSL 69-97
14. Check Appropriate Box To [nd}cate Nature of N~tice, Reiaort, or Other D~ta '
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF PULL OB ALTER CASINO
FRACTURE TREAT MULTIPLE COMPI,ETE
SHOOT OR ACIDIZE ARANDONs
REPAIR WELL CHANGE PLANS
iOther)
SUBSEQUENT REPORT OF :
WATER SItUT-OFF J__ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ~ ABANDONMEN'Ts
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
hie propose to re-enter the above well in order to:
a) Recover collapsed casing.
b) D±splace upper 2000 ft. to d±esel.
c) Suspend for later complet±on.
During the above operat±ons the well will be equipped with 20" 2000 psi
HYdril BOP. hiork is scheduled to beg±n about October 5, 1972.
1972:
DIVISION Of: OIL ANO ?~A5
I hereby certify thal~S~ fo~re$oins is true snd correct Manager (Operations)
SIGNED ~-f -
: G.'D. Tn.~lnr / ~ ' ~
See Instructions On Reverse Side
D*TE '9/13/72
- :,,,/ /
ALASKA !NC.
P.O. BOX 4-CCC
121 WEST FIREWEED LANE, SUITE 205
ANCHORAGE. ALASKA 99.503
TELEPHONE {907) 277-1422
Hatch 26,'70
Tot
}~. T.R
Chief P~roleumGeologia~
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Ak.
REFERENCE: Devia~iom Surveym
The following material is being submitted herewith. Please acknowledge receipt
by signing a copy of this letter and returning it to this office:--
2 copies:
BP 04-11-13
~P
Devia[io.n Survey-compuC~i on ~adius o£ Cu=vature Hethod
A-01576
US 7-2-10-11-13
BP ALASKA iNC.
P. O. BOX 4-CCC
12! WEST FIREWEED LANE, SUITE 205
ANCHORAGE. ALASKA 99503
TELEPHONE 277-1422
Decembe~ 16, 1969
CONFIDENTIAL
TRM
OKG
K,LV
RtL
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Thomas R. Marshall, Jr.
Chief Petroleum Geologist
Gentlemen:
BP 10-11'13
Enclosed for your information are two copiesof the Well History
on our above well.
Very truly yours,
BP ALASKA INC.
OPERATOR FOR BP OIL CORPORATION
hw
Enclosures
Drilling Superintendent
For H. J. Clarke
Form
]:~'V.
STATE OF AI. AEKA
OIL AND GAS CONSERVATION CON~ITTEE
SUBMIT IN DUPLICAT~
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
P. O. Box 4-CCC; Anchorage. Alaska 99503
LOCATION OF WFJ~
At surface:
1245' WEL, 1080' SNL, Sec. 9, TllN, R13E, UPM
~. AP1 N~{E~CAL CODE
50-029-20023-01
6. L~SE DESiG~A~ON AND S~IAL NO.
ADL-28281
2. NAME OF OPEi~ATOR 8. L~IT,F.~:iAI OR LEASE
BP ~S~ INC. Put ~ver
3. ADDRESS OF O~R 9. WE~ NO.
10. F~ ~D P~L. OR WILDCAT
Pru~oe Bay
Sec 10, TllN, R13E, UPM
12, PEI~VlIT NO.
69'9?
13. REPORT TOTAL DEPTH AT END OF MONTH, CI-I.A~NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET A/krO VOLLrNIES USED, PEP~FORATIONS, T~STS AAFD I~ESULTS, FISHING JOBS, JLrNK IN HOLE A_ND SIDE-TI~ACKED HOLE
ANT) AllY OTHER SIGNIFICANT CI-IA~S IN HOL~ CONDITIONS.
CONFIDENTIAL
November 1969 ·
1- 3
Cemented second stage of .9-5/8" job with 725 sacks Class G/10%
gel; third stage 140 bbls mud from 2201'. Nippled up. Drilled
out stage tools and cleaned down to float collar at 10365. Ran
CBL and Sperry-Sun gyro survey.
4- 6
Set drillable bridge at 2140'. Lost first plug and chased to
bottom.
Ran drill pipe to the plug, broke down 260 joints pipe. Dropped
bushing puller in hole. Fished with magnet and recovered both
hooks and 3' of chain. Left approximately 5' of chain in plug.
Displaced casing to diesel at plug, broke down pipe and suspen-
ded hole. Rig released at 1200 hours, November 6, 1969.
; /.~_/ ~, DIVI~iOH OF OIL ~ GAS
smmm ...... ~n~.~ Operations Manager DAV~ .DeCember 12~ 1969
n. o. ~±ar~e v~/ - IC~ ' '
NOTE--Report on this foll[m is r~or each calendar month regardless of the status of operations, and must be filed in duplicate '
with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed.
A-01571
US 7-2 10-11-13
BP ALASka INC.
P. O. BOX 4-C:CC:
12I WEST FIREWEED LANE, SUITE 205
ANCHORAGE, ALASKA 99503
TELEPHONE 277-1422
December 11, 1969
REL
FILE
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attn: Mr. Homer Burrell, Director
Gent lemen:
BP 10-11-13
Enclosed is Form P-7, "Well Completion or Recompletion Report and Log",
in duplicate, for the above well. Also enclosed are attachments as
listed on the form, except for the well history which will be forwarded
to you by Monday, December 15, 1969.
~JC/gk
Enc.
cc: Mr. P. Hardwick
Very truly yours,
BP ALASKA INC.
Operator for
OperatiOns Manager
la. TYPE OF WELL:
· SUBMIT IN DUPLIC.~.TI~*
:~TATE OF ALASKA , ',See other in-
structions on
OiL AND GAS CONSERVATION COMMITTEE reverse side)
-- .
WELL COMPLETION OR RECOMPLETI,ON REPORT AND LOG*
TYPE OF COMPLETION:
WELL OVER EN BACK r, ESVR. t._J Other
NAME OF OPERATOR
BP ALASKA
3. ADDRESS OF OPERATOR
·
P. O. Box 4-CCC Anchorage, Alaska. 99503
LOCATION OF WELL (Report location clearly and in accordance 'with,any $~a'te requirements)*
At surface 1245' WEL, ~1080' SNL, Sec. 9, TllN, R13E, UPM
At top prod. interval reported below '
9617' MD 8493' TVD : 1884' EWL 3233' SNL, Sec. 10, TllN, R13E,
At total depth
/' ,
5. API NUMER/CAL CODE
50-029-20023-01
$. LF:.A_.~. E DESIg~IX'i'IoN A_ND SER.I_A.L NO.
ADL 28281
7. IF I1N-DIA.N, AJ.J.X:)'~-r~ OR TI~IBE
'8. UNIT,Fa OR ~SE
Put River
9. W~L NO.
BP 10-11-13 "'
10. F~ ~ P~L. OR
Prudhoe Bay
11. SEC., T,, R.. M.. (BO~POM HOLE
OBJECTIVE)
sec. 10, TllN, K13E, UPM
12. PEIRMIT NO.
10415' MD 9208' TVD : 2071' EWL 3521'y SNL, Sec. 10, TllN, R13t 69-97
; ' ' ' ' "' .. ~ ' ," i' i"' ' '
DATE COiVLP,$USP, OR ABAND. 116. ELEVATIO
13. DA.TE S~UDDED [14. DXTE T.D. REA. CHED 1~. ", ,." , IIPM
9/24/69 ] 10/27/69" 11/6/69 ] :,' KBE',~ 57}33 ' - ---
18. TOTAL DEPTH. MI) a TVD [19. PLUG 'BA, CI~ I~P ~VID! & XIi~]~20, IF M'UL'r ;IiwLE COiV~PL.." [ 21.'
/ DEPTH 2140 MD I ~ow~Y. ] ROTAR~ TOOLS
10420 ' 9213' ]Float .10,365 ' MD ! -----
99.1PRODUCING INT~VAL(S), O,F ~-IIS CO,1ViPLETIO~I---TO~, BOTTOM, NA/ViE (MD AND ~)*
.,~
,
·
24. 'TYPE ELECTRIC AND OTh~-~ LOGS I%UN
ri) IL BHCS/GR, FDC, !"){L/~LL, SNP, LL3, CBL
CA, SING SIZE
30
20
13-3/I~
9-5/8
,,
i:.,i ,:, .CASING RECORD (Report all strings set in well)
Stove: / Pipe I 70
! 94 "~; 1I-I46 I 93z
[ 68 and 6,1 l K55 ] 4589
I 47'':'" I. N80 i10,410.
RE¢OI%D '
LINER
28.. PERFO.RATIONS OPEN TO PRODU.u-flON (Interval size and number) :i
' DATE FIRST PI~ODUCTION
,,
DATE OF TEST,
FLOW TUBING
INTERVALS '~)RILLED BY
CABLE TO01,S
Total ---
~. W~S DIREC~ON~kL
SURVEY NfADE
'From 10,415-
i
r ~O~ S =~ ]1q a ~~ RECO1RJ) i A1VIOUNT PULLED
36 ~ !175 sacks F, ondu/fl¥ ash Cta Non~
26 ~ ]2Oma ~k~ Fondu/fly' ash:
.17-1/2 13150 SkS Cl'a~s G- '"
,12-1/4,~[~3'70 ~ks,' c/.s~lt~/725 sks,:,',~/g~l
PRODUCTION · '.
;I~O~6CTIO'N METI-iO'D (Flowh~.g, gas Iii't, pumping--s'ize and type of pump)
. .
,
HOURS TES, TED ,;', CI-IOXE SIZE
PRESSUI~ CALCUI_~TED
~ ~-HOUR ~
· ~
DISPOSITION OF GAS (~old, ~8¢d ~, ~ted, e~c.)
SCR~KN (MD) SIZE DEPTH sET (MD) PACICER SET (MD)
29 ACID SI-lOT' .FiI~CTURE CF4~N~,,S.~UEEZS. ETC
," ' ' ' ~il " '
PROD'N FOi~ OIL--BBL. GA,S--1V/CF.
TEST PEPoIO'D
WELL STATUS (Producing or
shut-in)'
WATEH.-BB~. ,I G~S-OIL F~TIo
I
OIL--BBL.
LIST OF ATTACHMENTS
, ,
Baroid
eertlf7
SIGNED __
f}A~--l~C~'.. WATER--BBL. ] OIL GRAVITY-APl
I TEST WITNESSED BI'
well his directional surw
~nformat*on Is eom
TITLE OPERATIONS MANAGER
*(See Instructions and Spaces For AdditiOnal Data on Reverse Side)
well cutting~
samples
DATE Dec. 11, 1969_
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska. -
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
merits given in other spaces on this form.and in any attachments. ' '
Items 20, ,nd 22:: If thins:well is completed for: Separate production from more than one interval, zone
(multiple completion), =so.state in item. 20, and in item 22 show the prcducing inte[val, or in:tervals,.
top(s), bottom(s) and name (s) (if any) fOr only the interval reported in item .30. Submit a separate ,report
(page) on this form, adequately identified, f°r each. adc$itional intet Val'to be-.:seperately produced, show-
·
lng the additional data pertinent t° such inter, v. ai. -
.
_
Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing and the location, of-'the cementing tool.
Item 28: Submit a separate:completion., report On this form for each interval ito be separately produced.
(See instruction for items 20 and 22 above), - ''
- .
34. SUMMARY O1~ FORMATION TF-~T~ INCLUDIN(i INTEI~VAL ~T~, p~U~ DATA ~ ~O~ OF OI~
~ ' ' ; 35. · G~IC M~RK~.
WA~ AND M~
~ ..
.'
. . ..
~: ~ : Sub-saa
Nil Lower Cre~aceo~
~ ~confo~i~Y c.: 7973' c. 7066'
~.: .. . ... TOp 0~toma ~. 9504' 8336,
.-. ..
. ' , : : Top Shublik ~. 9540' 8368'
:
.~.
_
/
: Top Sadlerochit
/. ' = ~. 9617'. . 8436 '
.
'aS. COI{g OATA. A~CI[ BRIEF O~C~[emONS OF LITuo~GY. ~ROSITY. FRA~'rURm:. APP~NT DI~S' Base Sadler°chit
?~ ~ ~r~c~ s.ows,o~, om. ~: o" wx~. -
-
: -
.
. ~
:
:.
:
- . . , , : .
: ·
:
. .
. :
WELL NO. 3-2 (23-10-11-13) (~'
WELL HISTORY
DRILLING
1969
This well already had 20" 94 lb/ft, casing set at 931' with 2000 sacks
Fondu/Fly Ash cement.
Commenced cleaning out inside 20" casing at 0400 hrs on September 24,
1969. Drilled ahead 17-1/2" to 1987'. Ran Eastman turbodrill with 17-1/2"
bit but unable to make progress. Re-ran turbodrill with 12-1/4" bit and
drilled directionally to 2142'. Opened hole to 17-1/2" to 2142' Drilled
17-1/2" to 3825'. '
Changed hole size to 12-1/4" due to lack of control with 17-1/2" assembly,
and drilled to 4600'. Opened hole to 17-1/2".
Ran 13-3/8" 68/61 lb/ft K55 Seal-Lock casing and cemented at 4589' with
3150 sacks Class G with 0.75% CFR-2. The 20"/13-3/8" annulus was filled with
thixotropic mud above 835'. Installed and tested BOPs.
Drilled ahead 12-1/4" to 10,420'. Ran Schlumberger logs DIL FDC/C
BHCS/GR, SNP/GR/C, MLL/ML/C, LL3. ' '
Ran 9-5/8" 47 lb/ft N-80 Seal-Lock casing and cemented at 10,410' with
1370 sacks salt saturated Class G and 725 sacks Class G/10%gel 1% CFR-2.
Displaced 13-3/8"/9-5/8" annulus to thixotropic mud above 2201'. Nippled up.i~
Drilled out stage tools and cleaned down to float collar at 10,365'
Ran CBL and Sperry-Sun gyro survey. '
Set a drillable bridge plug at 2140' after losing one plug which was chased
to the float collar. Lost bushing puller while breaking down pipe. Fished
with magnet recovering both hooks and about half the chain.
Displaced the casing to diesel at the plug. Installed cover on wellhead.
Rig released 1200 hours, November 6, 1969.
WORKOVER
October 8-12, 1972
Commenced operations at 0500 hours, October 8, 1972. Tested 20" Hydril
to 1000 psi. Ran in with 5%", 5-3/4" and 7%" swages to 210 ft. Swaged 9-5/8"
casing from 210 ft. to 775 ft. Ran in free to 2146 ft. Displaced diesel with
CaC12. Ran 8½" swage assembly and swaged from 234 ft. to 693 ft., and ran in
free to 2146 ft. Fished out chain left from previous operations Spotted cement
plug with 50 sacks Permafrost II with 15 lb/sack Pozzolan. Slurry weight 14.6
ppg. Removed 20" Hydril and cut 9-5/8" casing at 31 ft. Ran dialog free point
from 200 ft. to 1990 ft. Ran mechanical cutter, jars to cut 9-5/8" casing at
1903 ft., Without success..-. Ran multiple string cutter and cut 9~5/8'' casing at
1905 ft. Pulled and recovered casing.
BP WELL NO.~-2 (23-10-11-13)
WELL HISTORY
October 13-17, 1972
Ran 4 arm caliper in 13-3/8" casing. Ran dialog free point indicator
and CCL. Welded on 20" bradenhead and nippled up 20" Hydril. Ran 12¼"x10½"
swaging assembly and swaged from 557 ft. to 561 ft.; felt slight dray at
681 ft.; and ran in free to 1079 ft. Ran 12¼" bit to top of 9-5/8" casing
stub. Ran 8½" bit and dressed cement plug to 2100 ft. Ran 6-3/4" bit and
drilled 20" rat hole in cement plug. Cut, pulled, and recovered 9-5/8" casing
to 2050 ft. Cut, pulled, and recovered 13-3/8" casing to 908 ft. Ran 18½"
bit to top of 13-3/8" casing stub at 908 ft. Washed over 9-5/8" casing to
2083 ft. with 11-3/4" washpipe. Circulated and displaced hole with diesel.
Removed BOP, replaced well cap and tested to 1500 psi. Rig released at 1400
hours, October 17, 1972.
COMPLETION
May, 1977
Accepted rig 1800 hours, May 18, 1977. Displaced diesel to CaC12 to
2079'. Dressed 13-3/8" stub' at 905'. Ran 23 joints 13-3/8" 72# controlled
yield N-80 Buttress tieback st.ring with Baash-Ross casing patch at 918'. Ran
temperature survey. Arctic Packed 13-3/8"x20" annulus. Dressed 9-5/8" stub at
2047'. Ran 51 joints 10-3/4" 55.5# controlled yield N-80 Buttress casing tie-
back string with 9-5/8" Baash-Ross casing patch at 2053', 9-5/8"x10-3/4" cross-
a '
over t 2003 . Ran temperature survey. Arctic Packed 10-3/4"x13-3/8" annulus.
Drilled out cement plug and bridge plug at 2079'. Cleaned out to 10350'.
Tested all casing strings to 3000 psi. Ran logs to' 10350'. Ran 5-1/2" tubing
and 8-5/8"x5-1/2" Thermocase. Packer did not set. Pulled tubing and Thermocase.
Lost bands and control lines while pulling tubing. Left PBR and packer assembly
in hole. Fished out bands, control lines and PBR. Fishing for packer at 2047'.
June, 1977
Fished for and recovered packer and tailpipe. Pressure tested casing and
found D.V. collar open at 6492'. Unable to close D.V. Squeezed D.V. four times
with a total of 300 sacks of cement. Tested squeeze to 2500 psi okay. Set
production packer at 9348'. Ran 29 joints 5-1/2" 17# controlled yield N-80 8RD
A/B modified tubing, 218 joints 5-1/2" 17# L-80 Atlas Bradford IJ-4S tubing,
and 52 joints 8-5/8"x5-1/2" Thermocase I. Displaced tubing to diesel and landed
tubing with ball valve nipple at 2012' and bottom of Thermocase I at 1977'.
Installed wellhead. Ran dummy gun to 10350'. Set BPV. Released rig at 2400
hours, June 12, 1977.
PERFORATING
August 7, 1977
2~7/8'' Hyperdomes 1/2" 4 S.P.F.
10007-10022' BKB (ref BHCS/GR, 10/28/69)
10037-10046' " ( ,, ,, )
10067-10082 ' " ( ,, ,, )
10094-10114 ' " ( ,, ,, )
10128-10143' " ( ,, ,, )
Prior to perforating, ran a CNL/GR/CCL and temperature survey. Ran and set
S.S.S.V. in nipple at 2012' BKB.
The S.S.S.V. was closure tested on August 11, 1977. The test was~witnessed by
a state representative.
CASING RECORD
CONFIDENTIAL
Casing Size
Weight LB/FT Grade
Depth Set (MD) Hola Size Cementing Record
Amounn Fulled
30"
20"
13-3/8"
13-3/8"
9-5/8"
10-3/4"
Stove Pipe
94# H-40
68#/61# Km55~ J~55
72# .. N-80
47# N-80
55.5# N-80
70' 36"
931' 26"
175 sks Fondu/fly ash
2000 sks Fondu/fly ash
4589' 17½" 3150 sks Class G 908'
Baash Ross casing patch at 918'
10410'
12¼" 1370 sks G/salt; 725 sks G/gel 2050'
Baash Ross casing patch at 2053', 1 it. 9-5/8" casin~to 2003'
BP ALASKA INC.
Put River BP 10-11-13
API 50-029-20023-1 Permit 69-97
Well History_
During the move from BP 09-11-13 the Brinkerhoff rig was modified to incorporate
a new mud system, winterization and rig moving equipment.
This well already had 20" 94 lb/ft casing set at 931' with 2000 sacks Fondu/Fly
Ash cement.
Commenced cleaning out inside 20" casing at 0400 hfs on September 24, 1969. Drilled
ahead 17-1/2" to 1987'. Ran Eastman turbodrill with 17-1/2" bit but unable to make
progress. Re-ran turbodrill with 12-1/4" bit and drilled directionally to 2142'.
Opened hole to 17-1/2" to 2142'. Drilled 17-1/2" to 3825'.
Changed hole size to 12-1/4" due to lack of control with 17-1/2" assembly, and
drilled to 4600'. Opened hole to 17-1/2".
Ran 13-3/8" 68j61 lb/ft K55 Seal-Lock casing and cemented at 4589' with 3150 sacks
Class G with 0.75% CFR-2. The 20"/13-3/8" annulus was filled with thixotropic mud
above 835'. Installed and tested BOPs.
Drilled ahead 12-1/4" to 10,420'. Ran Schlumberger logs DIL, FDC/C, BHCS/GR,
SNP/¢R/C, ~LL/~/C, LL3.
Ran 9-5/8" 47 lb/ft N80 Seal-Lock casing and cemented at 10,410' with 1370 sacks
salt saturated Class G and 725 sacks Class G/10% gel 1% CFR-2. Displaced 13-3/8"/
9-5/8" annulus to thixotropicmud above 2201'. Nippled up.
Drilled out stage tools and cleaned down to float collar at 10,365'. Ran CBL amd
Sperry-Sum gyro survey.
Set a drillable bridge plug at 2140' after losing one plug which was chased to the
float collar. Lost bushing puller while breaking down pipe. Fished with magnet
recovering both hooks and about half the chain.
Displaced the casing to diesel at the plug. Installed cover on wellhead.
Rig released 1200 hfs, NOvember 6, 1969.
Coring
Nil
Testing
Nil
Velocity. SurVeY
Nil
Ii ~ 1 ri · 1, r
30
20
-5/8
Wt/Ft
S rove
68/61
47
Grade Depl:h ~
Pipe ' 70
H40 931
K55 4589
N80 10410
St_~e Tools
885
6504,2201
lst. S_t_a g~
175 sks Fondu/Fly Ash
2000 sks Fbndu/Fly Ash --
3000 sks Cl. G~75% ' "13~bbls mud and
CFR-2 lf~ sks Cl. G
1370 sks salt sat.
Class G
725 sks Cl. G/10%
g~l% CFR-2
P. ALASKA,
ASURED D E
PTH ANGLE
IGIN LOCATED
990 0 30'
520 0 O'
962 0
003 I O'
03~" 2 15'
066 3 45'
097 5 15'
112 5 15'
171 7 O'
1201 7 45'
1264 8 30'
1297 9 O'
1360 10 O'
!453 11 O'
!546 12 15'
~638 14 O'
~763 16 O'
~857 18 O'
2981 21 O'
3136. 24 30'
~26~ 28 O'
338 31 30'
3449 33 30'
3544 33 30'
3638 33 O'
3675 32 15'
3706 31 30'
3733 31 30'
3795 30 15'
3857 30 15'
3889 30 30'
INC.
~,~_.~ WELL CO
10-11-13¢~'ELL COMPLETION
N P L E
REPORT
I A T I 0 N
DIRECTION TVD SUB SEA
AT MD = =
S 24E
S OE
S 0E
S 59:
S 46:
S 38-_-
S 42:_
S 56:
S 57:
S 59:
S 67--
S 67E
S 62E
S 65E
S 67E
S 65E
S 67E
S 64E
S 62E
S 64E
S 64E
S 62E
S 59E
S 65E
S 70E
S 59E
S 54E
S 56E 3611.87
S 54E 3665.09
S 62E 3718.64
S 62E 3746.25
0.00, TVD
989.96
1519.95
1961.95
2002.95
2034.93
2065.89
2096.80
2111.73
21'?0.39
2200.14
2262.51
2295.13
2357,26
2448.70
2539.80
2629.39
2150.12
2840.01
2956.89
3099.80
3211.90
3320.40
3373.53
3452.75
3531.36
3562.53
3588.85
T I 0 N R E P 0 R
PREPARED 11/03/69
TOTAL CCORDINATES
LATITUDE DEPARTURE
0.00, LATITUOE
932.96 7.89S
1462.95 10.13S
1904.95 10.lBS
1945.95 IO.4]S
1977.93 , 10.98S
2008.89 12.19S
2039.80 14.05S
2054.73 14.95S
2113.39 18,42S
2143.14 20.46S
2205.51 24.50S
2238.13 26.46S
2300.26 30.94S
2391.70 38.50S
2482,80 46.12S
2512.39 54-62S
2693.12 67.77S
2783.01 79.17S
2899.89 97.96S
3042.80 125.17S
3154.90 149.40S
3263.40 177.55S
3316.53 194.22S
3395.75 218.82S
3474.36 238.54S
3505.513 247.I1S
3531.85 256.15S
3554.87 264.24S
3608°09 282.48S
3661.64 299.02S
3689.25 306.62S
0.00,
3.51E
3.99E
3.99E
4.!5E
4.87E
5o96E
7.52E
8.55E
I3.80E
17.07E
25.00E
29.62E
39 .OOE
54.16E
71.28E
90.3'7E
119,92E
144.92E
181,80E
235.19E
284.88E
340.13E
369.59E
415.86E
463.46E
481.44E
495.09E
506.64E
532.70E
559.17E
573.46E
T /7,; ~., .... P A G E 1
RADIUS OF CURVATURE METHOD
'C L 0 S U R E S DOG LEG SECTION
DISTANCE ANGLE SEVERITY DISTANCE
DEPARTURE
8.63 S
10.89 S
10.89
11.23
12,02
13,57
15,94
17,22
23.02
26.65
35 .CO
39.72
49.78
66.45
84.90
105.59
137.75
165.14
2C6.51
266.43
321.68
383.69
417.51
469.92
521.25
541.16
557.43
571.41
6C2.97
634.10
650.29
= 0,00
24,00E 0.000 7,50
21,48E 0.094 9.21
S 21.48E 0.000 9.21
S 21.73E 2.439 9.52
S 23.94E 4.C47 10.43
S 26,06E 5.012 12.01
S 28.16E 4.940 14.38
S 29.7EE 8.519 15.74
S 36.84E 2.971 22.0~
S 39.83E 2.642 25.8'7
S 45.57E 2. 150 34.6~
S 48.21E 1.515 39.5]
S 51.57E 2.056 49.'/~
S 54.59E 1.225
S 57.0gE 1.412 84.7~
S 58.85E 1.964 105.1~
S 60.52E 1,652 136.7~
S 61.35E 2.322 163.6~<
S 61.68E 2.478 204.5]
S 61.97E 2. 312 263.6i
S 62.32E 2.800 318.0'
S 62.43E 2.910 379.2',
S 62.27E 4.076 412.8;
S 62.24E 3.484 464.7~
S 62.76E 2.963 514.7
S 62.82E 16.137 534.3
S 62.64E 8.851 550.7
S 62,45E 3.870 564.8
S 62.06E 2.6C8 596.6
S 61,86E 6,496 627,7
S 61.86E 0.781 643.7
. Po ALASKA,
;'!EASURED D E V
DEPTH ANGLE
INC ·
3983
4077
4171
4264
4390
4(" s
4484
4546
4634
4696
4757
4870
4934
4980
5105
5231
5386
5537
5691
5844
5947
6072
6167
6260
6387
6512
6616
6774
6928
7101
31 O'
31 30'
32 O'
32 30'
32 30'
32 15'
32 O'
31 30'
31 15'
32 30'
33 45'
34 15'
34 O'
34 O'
34 O'
34 O'
34 15'
3~ 45'
33 O'
32 30'
32 O'
32 O'
32 30'
32 30'
33
35 O'
37 30'
37 45'
38 O'
36 45'
36 O'
W E L L C 0 Y P L E T I C N R E P
0 R T PAGE
10-11-13 WELL COMPLETION REPORT PREPARED 11/03/69 RADIUS OF CURVATURE FETHOD
I A T I 0 N TCTAL CCORDINATES C L O S U R E S DCG LEG
DIRECTICN TVD SUB SEA LATITUDE DEPARTURE DISTANCE ANGLE SEVERITY
S 62E
S 60E
S 59E
S 61~
S 56~
S 67~
S 67~
S 64~
S 69~
S 74~
S 70~
S 73E
S 67E
S 67E
S 67E
S 67E
S64E
S 65E
S 64E
S 64E
S 64E
S 63E
S 62E
S 63E
S 61E
S 60E
S 59E
S 59E
S 57E
S 55E
S 54E
3827.03 3770.03 329.18S 615.89E -698.35 S 61.87E 0.531
3907.40 '3850.40 352.82S 658.54E 747.10 S 61.81E 1.225
3987.33 3930.33 377.93S 701.16E 796.53 S 61.67E 0.772
4065.98 4008.98 , 402.74S 744.14E ~846.13 S 61.57E 1.267
4172.25 4115.25 438.10S 801.84E 913.72 S 61.34E 2.131
4221.23 4164.23 452.90S 829.09E 944.73 S 61.35E 10.153
4251.72 4194.72 460.38S 846.7lE ~-963.78 S 61.46E 0.694
4304.44 4247.44 473.91S 876.40E 996.32 S 61.59E 2.670
4379.58 4322.58 492.175 918.40E 1041.97 S 61.81E 2.971
4432.22 4375.22 502.555 949.44E ~1074.24 S 62.10E 4.710
4483.31 4426.31 512.85S 981.1'3E 1107.09 S 62.40E 4.126
4576 99 4519 99 532 90S 1041 C5E 1169 52 S 62 89E 1 548
· · · . ~,~ · . .
4629.97 4572.97 545.17S 1074.77E ~1205.14 S 63.10E 5.272
4668.11 46II.ii 555.23S 1028.45E 1230.80 S 63.18E 0.000
4771.74 4714.74 582.54S 1162.79E '1300.56 S 63.38E 0.000
4876.20 4819.20 610.07S 122'1.65E 4370.88 S 63,57E O.CO0
5004.51 4947.51 646.12S 1306,77E 1457.78 S 63.69E 1.097
5129.69 5072.69 682.47S 1382.98E '1542.21 S 63.73E 0.496
5258.29 5201.29. 718.95S 1459.44E .1626.92 S 63.77E 0.603
5386.97 5329.97 755.23S 1533.84E 1709.69 S 63.78E 0.326
5474.08 5417.08 7?9.32S 1583.24E 1764.65 S 63.79E' 0.485
5527.51 5470.51 744.22S 1613.11E 1798.03 S 63.78E 0.841
55/9°94 552,2.94 809.49S 1642.46E .1831.11 S 63.76E 1.179
5660.07 5603.07 833.06S 1687.73E 1882.14 S 63.72E 0.565
5738.28 5681.28 856.68S 1732.15E -1932.42 S 63.68E 1'281
5843.56 5786.56 891.65S' 1793.96E 2003.33 S 63.57E 1.635
5944.36 5887.36 929.16S 1857.64E 2077.06 S 63.42E 2.055
6026.73 5969.73 961.865 1912.06E .... ,~140.37 S 63.29E 0.240
6151.45 6094.45 1013.26S 1994.32E 2236.97 S 63.06E 0.793
6273.83 6216.83 1065'53S 2071.82E 2329.76 S 62.78E 1.131
6413.12 6356.12 iI25.11S 2155.34E .-,2431.33 S 62.43E 0.552
SECT]
OISTA~
691,
739
788
838
905
936
955
986
1031
1062
1094
1154
1189
1214
1282
1350
1435
1518
1602
1683
1737
1770
1803
1853
1903
1973
2047
2110
2207
2300
24O3
2. 8 ,7
WELL COMPLETION
REP
P. ALASKA, INC. 10-11-13 WELL COMPLETION REPORT PREPARED 11/03/69
'ASURED D E V I A T I 0 N TOTAL CCORDINATES
~PTH ANGLE DIRECTION TVD SUB SEA LATITUDE DEPARTURE
?290 35 30' S 54E
7352 34 45' S 52E
7470 33 45' S 51E
7659 32 30' S 49E
780[' 33 30' S 49E
79~b 36 30' S 47E
8155 39 30' S 45E
d326 38 30' S 42E
8505 37 30' S
8745 35 0~ S 40E
8882 33 30' S 40E
9068 32 15' S 40E
9365 28 30' S 38E
0524, 27 45' S 34E
'7702 27 15' S 30E
9800 27 30' S 30E
.OiOT 26 15' S 32E
,0415 25 O' S 34E
6566.51 6509.5I 1190.028 2244.68E
6617.22 65'60.22 1211.48S 2273.16E
6714.75 6657.75 1252.83S 2325.14E
6873.03 6816.03 1319.21S 2404.25E
6995.48 6938.48 1371.38S 2464.26E
7153.55 7096.55 1445.44S 2546.51E
7277'26 7220.26 1512.57S 2616.03E
7410.15 7~53.15 1590.62S 26~0.10E
7551.20 7494.20 i6?3.16S 2763.12E
7744.73 768/.73 1781.06S 2855.28E
7857.97 7800.97 1840.125 2904.84E
8014.18 7957.18 1917.46S 2969.74E
82?0°37 8213.37 2034.15S 3064.23E
8410.59 8353.59 2094.T7S 3~08.27E
,,
8568.48 8511. 8 164.468 151.82E
8655.51 8598.51 2203.49S 3174.35E
89 9. 4 887 . 4 3245.82E
9207.04 9150.04 2434.14S) 3318.36E1,
CLOSURE 4115.41
S 53- 44' E
0 R
T PAGE
RADIUS OF CURVATURE METHOD
C L 0 S U R E S DOG LEG
DISTANCE ANGLE SEVERITY
2540.61 S 62.06E
2575.85 S 61.94E
2641.18 S 61.68E
0.264
2.215
0.972
0.878
0.684
1.663
2.065
1.249
0.656
1.070
1.094
0.672
1.307
1.276
1.074
0.255
0.5O2
0.493
2742.40 S 61.24E
2820.15 S 60.90E
2928.15 S 60.42E
3021.84 S 59.96E
3125.18 S 59.4CE
323C.22 S 58.80E
3365.23 S 58.04E
3438.63 S 57.645
'3534.97 S 57.15E
3677.94 S 56.42E
3748.26 S 56.02E
-3823.46 S 55.52E
3864.18 S 55.23E
,3991.12 S 54.41E
4115.41 S 53.73E
SECTIO~
DISTANCE
2513.8(
2549.41
2615.8]
2718.8<
2798.1
2908.2
3004.0
3109.9
3217.6
3355.7
3430.6
3528.7
3673.9
3745.2
3821.6
3862.8
3990.8
4115.4
H E L L C 0 N P L E T ! C N R E P 0 R T PAGE
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB SEA DEPTH
B. P. ALASKA, INC. 10-11-13 WELL COMPLETION REPORT PREPARED 11/03/69 RADIUS OF CURVATURE
EASURED
EPTH
TOTAL COORDINATES MD-TVD VERTICAL
TVD . SUB SEA LATITUEE DEPARTURE DIFFERENCE CORRECTION
1057
1157
1257
1357
1557
1657
1757
1857
1957
2057
2158
2258
2360
2461
2564
2667
2770
2875
2981
3200
3313
3429
3549
3668
3786
3902
4018
4135
1057.00 1000.00 -8.17S 3.57E 0 0
1157.00 1100.00 -8.60S 3.66E C 0
1257.00 1200.00 -9.02S 3.75E 0 0
1357.00 1300.00 -9.44S 3~E4E C 0
1457.00 1400.00 -9.87S 3.93E 0 0
1557.00 1500.00 -10.13S 3.99E 0 0
1657.00 1600.00 -10.135 3.995 0 0
1757.00 1700.00 -10.135 3.99E 0 0
1857.00 1800.00 -10.135 3.99E 0 0
1957.00 1900.00 -10.13S 3.99E 0 0
2057.00 2000.C0 -11.84S 5.655 0 C
2157.00 2100.00 -17.63S 12.60E 1 ~ 1
2257.00 2200.00 -24.145 24.29E 1 0
2357.00 2300.00 -30.92S 38.g6E 3 2
2457.00 2400.00 -'39.195 55.72E 4 1
2557.00 2500.00 -47.755 74.955 7 3
2657.00 2600.00 -57.63S 97.12E 10 3
2757.00 2700.00 -68.65S 121.83E 13 3
2857.00 2800.00 -81.905 '150.28E 18 5
2957.00 2900.00 -97.985 181.845 24 6
3C57.00 3000.00 -117.025 219.20E 33 9
3157.00 3100.00 -137.53S 260.54E 43 10
3257.00 3200.00 -161.1,0S 307.845 56 13
3357.00 3S00.00 -189.03S 360.425 72 16
3457.00 3400.00 -219.895 418,435 , 92 20
3557.00 3500.00 -245.59S 478.25E 111 19
3657.00 3600.00 -279.71S 528.745 129 18
3757.00 3700.00 -309.625 579.10E 145 16
3857.00 3800.00 -338.00S 631.79E 161 16
3957.00 3900.00 ~368.40S 684.99E 178 17
W E L L C 0 P P L E T I O N R E P O R T
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB SEA DEPTH
PAGE
B. P. ALASKA, INC. 10-11-13 WELL COMPLETION REPORT PREPARED 11/03/69 RADIUS OF CURVATURE
EASURED
EPTH
TVD SUB SEA
TOTAL COORDINATES
LATITUCE DEPARTURE
MD-TVD
DIFFERENCE
VERTICAL
CORRECTION
4253
4372
4490
4608
4846
4967
5087
5208
5329
5449
5570
5689
5808
5927
6045
6163
6283
6404
6528
678£
6907
7031
7155
7278
7400
7520
7640
7759
4057.00 4000.00 -399.90S 739.23E 196 18
4157.00 4100.00 -433.03S 793.56E 215 19
4257.00 4200.00 -461.73S 849.68E 233 18
4357.00 4300.00 -486,68S 905'.78E 251 18
4457.00 4400.00 -507.55S 964.81E 269 18
4557.00 4500.00 -528.62S 1028.26E' 289 20
4657.00 4600.00 -552.30S 1091.555 310 21
4757.00 4700.00 -578.65S 1153.64E 33C 20
4857.00 4800.C0 -605.01S 1215.73E 351 21
4957.00 4900.00 -632.77S 1277.475 372 21
5057.00 5000.00 -661.36S 1338.72E 392 20
5157.00 5100.00 -690.22S 1399.21E 413 ~ 21
5257.00 5200.00 -718.58S 1458.67E 432 19
5357.00 5300.00 -746.78S 1516.515 451 19
5457.00 5400.00 -774.605 1573.555 470 19
5557.00 5500.00 -802.81S 1629.615 488 18
5657.00 5600.00 -832.16S 1686.00E 506 18
5757.00 5700.00 -862.90S 1743.14E 526 20
5857.00 5800.00 -896.655 !'802.44E 547 21
5g57.00 5900.00 -934.18S 1865.~9E 571 24
6057.00 6000.00 -974.3BS 1932.02E 597 26
6157.00 6100.00 -1015.63S 1997.83E 624 27
6257.00 6200.C0 -1058.34S 2061.16E 650 26
6357.00 6300.00 -llOl.llS 2121.69E 674 24
6457.00 6400.00 -1143.68S 2180.90E , 698 24
6557.00 6500.00 -1185.99S 2239.145 721 23
6657.00 6600.00 -1228.34S 2294.36E 743 22
6757.00 6700.00 -1270.54S 2346.255 763 20
6857.00 6800.00 -1312.48S 2396.235 783 20
6957.00 6900.00 -1354.98S 2445.40E 8C2 19
:ASURED
'PTH
?88O
3002
3129
~258
338(
3512
3636
3760
3881
:)000
9118
9234
9350
9463
9576
9689
9802
9914
0026
0138
024('
0360
W E L L C ON P L E T I 0
INTERPOLATED VALUES FOR EVEN 100 FEET
N R E P 0 R T
OF SUB SEA DEPTH
Bo P. ALASKA, INC. 10-11-13 WELL CCNPLETION REPORT PREPARED
TOTAL CCORDIN4TES ND-TVD
TVD SUB SEA LATITUDE DEPARTURE DIFFERENCE
7057.00 7000.00 -1400.2.0S 2496.27E 823
7157.00 7100.00 -1447.30S 2548.45E 845
7257.00 7200.00 -1501.57S 2604.,65E 872
735?,00 ?300.00 -I559.40S 2660.48E .901
7457.00 7400.00 -1618.03S 2714.35E 928
7557.00 7500.00 -1676.39S 2765.88E 955
7657.00 7600.00 -1732.14S 2813.50E 979
7757.00 7700.00 -1787.46S 2860.65E 1003
7857.00 7800.C0 -1839.61S 2904.41E 1024
7957.00 7900.00 -1889.155 2945.98E 1043
8057.00 8000.00 -1936.965 2985.53E 1061
8157.00 8100.00 -1982.51S 3022.41E 1077
8257.00 8200.00 -2028.06S 3059.29E '1093
8357.00 8300.00 -2071.60S 3091.44E 1106
8457.00 8400.00 -2115.25S 3121.07E 1119
8557.00 8500.00 -2159.39S 3148.65E 1132
8657.00 8600.00 -2204.13S 3174.'74E 1145
8757.00 8700,00 -2247.57S 3200,84E 1157
8857,.00 8800.00 -2291.01S 3f26.94E 1169
895~.00 8900.00 -2333.56S 3253o04E 1181
9057.00 9000.00 -2573.78S 3279.17E 1192
9157.00 9100.00 -2414.01S 3305.29E 12C3
PAGE
11103/69
VERTICAL
CORRECTION
21
22
27
29
27
27
24
24
21
19
18
16
16
13
13
13
13
12
12
12
ll
li
RADIUS
OF CURVATURE
WELL C 0 M P L E
I NTERPCLATED VALUES FOR EVEN 100
B. P. ALASKA, INC. 10-11-13 WELL C
T I 0 N REPORT
0 FEET OF MEASURED DEPTH
CNPLETION REPORT PREPARED
EASURED TOTAL COORDINATES
EPTH TVD SUB SEA LATITUDE DEPARTURE
1000 999.96 942.96 -7.93S 3.52E
2000 1999.95 1942.95 -lO.41S 4.14E
3000 2974.40 2917.40 -101.29S 188.34E
,
400e 3841.57 3'~84.57 -333.46S 623.61E
50~ 4684.69 4627.69 -559.60S 1108.75E
6000 5519.03 5462.03 -791.85S 1608.37E
7000 6331.80 6274.80 -1090.33S 2106.58E
8000 7155.13 7098.13 -1446.29S 2547.40E
9000 7957.07 7900.07 -1889.19S 2946.01E
0000 8833.90 8776.90 -2280.98S 3220o91E
MO-TVD
DIFFERENCE
0
0
25
158
315
480
668
844
1042
1166
PAGE
11/03/69
VERTICAL
CORRECTION
0
0
25
133
157
165
188
176
198
124
RADIUS OF CURVATURE
:
'.>'. ~:':'::.. ' -" 'L' .':' :. ': -"~ '
.
"FOR -' ...' ~: .:-,.,--
. .~..: .:.v.: .- :,,{ .. -, .: · :
. . '.
.
[ , i 1111 - ~..
~ .
TYPE OF SURVEY. GYROSCOPIC. M[J'LTISRO?::~/~/'"
SURVEY DF-~q~H: FROM-
LEASE_-._ Put
FIELD:,,, Wildcat
Surface Iq'. TO_ 10,356 FT. :' '
..~
·
"-'"' ' ~WELL I~O. 10-11-13 ~:D' ~'-'~ '
.
COUNTY/PARISH_ North Slope ' . STATE Alaska '
DATE OF SURVEY.November 3, :1969 .OS NO.. 8U-3-16530 . ''
. . .. :':..' : . ,- . -_ - .- · : :,", .
' OFFICE: ?nchorage~ Alaska' :':'":'-'-:.-'-.'(:"'. ':-..' '.'? ~ .: -..
.... B--P--ALASKA-INC
_--P-U-T-I--R-I-VER W.E-L-L--NO.' ! 0-----1-1=..1-3
..... NORIFL-~LO P.E
....... A LAS
NO_V_EI~LBER_3_, --L9_69 ' Sg RV_E_Y__QkIE.
VER_T_I_CAL_SEC~_IDN--CI] M P U~T_ED~_AJ..DNG C_L0~S.UKE
..
- .
%P-ERR Y- SUN__WE.t,-L--SUP,-V-E-Y-LN-G C ELM_ P AN Y
S !J' 3- ! 6.5_S_0____
RECORB_OE_SU.P,_¥EY
TRUE -
N-EASU R ED ¥ ER-'[ICAL
----------.-DEPTH DE-PTH
0-, O. 00
IN C-L-I NA_T_L0 N__D I_ RE C~T_iON
gEG--~ N g E.G
DO.G-,LEG
$ EVER.II_Y VERT II;AL
O~G/-.! 00 SECT [.ON
0KI.GIN-AT THE SU.REAC.E
R E C T A N GUL.A R COORD_I_NAIE~S
N.gBTH' · $01JTN E~S_T '
o.oo O.QO
ll~O = g 9. g9
ZO.O= 1_9.9.99
0--I 5 S 'RW
0 15 S49_;W
o_._0_0 0_._21
0_._1_7 0.13
-0~43
- 0_._71
300:2.9_9.99
AO0.. ' 399_._99
5.00~ 499_.~9
0 15 S ?4__W
0_~.0 ~ 3_4_W
o 15 g 3_4___W
0-10 0.23
' 0.?5 0.28
0.2 5 o .31
-1.11
-lJB~
-2.20
60_0. 59_9..99
, 700.. 69 9
800.; -199
.0 15 S 9 W
.0_15 S 29 F
fi g0 -S 9,P
o-10 0_._52
0 ._l&_ · 0_._92
o. 27 1.5_6
- 2 ._63
- 3_._03
-3 · 87
q_00-. 899.._9_8
10.0.0_. . . g_99_..98
11.0_0., !.Q9-9-.9 R
!200, .119o,o8
O.~O S 1 F
o 0 s 0_F
0 _ 0 S OF
olD6 2. LO
0_.__4-9 2 ._LO
O_._OO 2 ._LO
-4_._7_4
-4_.-74
' - 4_._74
o 1':; .?; 18 F
o. 25 2 ._4_6
-5.16
13_00_. 1.299-,98
140.0_.. ! 39_9_._98
0 0 S 0 E
0 15 N 4 .W
0_._25 2 .A6
0_,25 2 · 17
-5._%6'
-4 ._7_72
- L-_0.O .
-.- b__O_O.
- 1 ,_0_0 ....
.
.o..8_6L- ~_
- 0_,_8_6~
-0.90
1500, 1 A9.9..98
1. _60.O.. 1.59_9~ 98
1700, !6o9.o8
].8O o_. t Z99.73
0 1.5
0__0
0 o
0_3.0
N 8_7 E
N O_F
N o F
N 1 W
0.35 2 ._5_0
0_.25 2.5_0
O.O_0 '2.50
0,__4_9 1 ._9_6
-4
-4.70 '
-4.70
- 0_,_46 .
-0_. 46 .
· -0.46
1900 .... 18_99_._9.7
2_000.. 1999_. 96,
o 15
.0'4.5
.~4_7___E
s 57E
0_.3_8
Q_,_7~.
2 ._0_3
- 3_,_5__3
-4 ._2_4_ ' 0._. 93
-"?- 0 .J._6
?_L.QQ-. ? 099.62
2.20.0... 2_1.9.8_..87
2.3_00.. ' 229.7_.._7_7
? ..... 0
.~ 51_ 'F
S__6_I_E
_S6.4 ~, E
4 .D_0
2 .._4_6
L._5_5
11 ,_61
2
3_8_._L4
--9._ZL6 - 7.3.7
- L5_..__3_6 ' L8_._0_3
-2] .84 31.31
--~ B--P--A L-A S K-A--I-N C-
..... PUTT--Rt-VE-R-:W EL-L--N 0-, 10-.---1-1---13
..... NO R-T H--S L.OP-E
-A LA S KA--
P_A G E___2 __
N 0 VEM B E.R--3-, --19 69 S U R.V.E.Y__DA_?_E
-V:ERI-I CA L-SEC-T-I.ON--C 0 M P_U.T_E D.._AJ_ 0 KG._C.L.O.S.U R E
.S P-E-R R-Y----S> U N-.WEL-L--SUR-¥.E-~I-N C>--C~C-I~,-AN Y
S.U..--3--1-6530
.;
·
RECORD--OF,. SURV-E-Y
TRUE
ME-ASURED- VERT-I-CAL
D E-P-T-H D E-PA: H
INCL-IN A-T.I.CN DI RECTI ON DO-G--LEG-
S EVER-LT-Y
DEG--I~I-N DEG DE-G/-1,O..O
V E R-I-I CAL
, S EC_T-ION.
REC_TANGU L A R_C 0.0 RD..I NAIF_._S ,
~ORTH $O.U.T..H EA.S..T WF ST ,
2400~. 2-3-9 6-,-33
2-50 Oo 2-4
2600~, 2-59 2-. 03
9--45 S 6-4 E 1-.-2-~
-1-1 0 S--64 E 1-. 2-4
12 45 S-6-5----E 1.2_6__
73_.A1
g_4~ 9A
- 29...2 7 4.6. 53 .
- 3_7_, 6.3 63_* .68__
-46/.96 83_.68 .....
2-700', 2-6-8-8.7 3
2800-. , 27-84--61
2-9-00. 2-8-7-9-o-3-1
]._4-,5 E i.o]_
1-6--30 S--63--E 1 .... 7_7
18--4-5 S--63-_E 2_,.2_4
L
! ! g-~..8_7
1-4-L_7-8
17_9.o37
- 5.8. ! ? 10.6.._5 7 , '.
- 7_1 ..01 13.1_..8.7.
- 85_._6_1___16 0_._5.1
3 000 = 2 9-7-Z.-66
3-1-00-. 3-0-64- .- 5.4
32-C~0; 3-1-54-.~6-1
2-1. ,0 $ 62 E 2_.2.7
Z3--15 S._6_l E
2-52-4-5 S--6-1-E' 2.-.__4-9 .
2 L4_..7 0
253...._72
2.96...6_7
- 10.2_.._43 192.._16
- 12_1_._5,7 226..._6.8
- 1 42_...63 ?
·
3-30.0-. 3.2-4. 2--,-2-9
34 CO-.- 33 2--L'.-7 8
3-500. .,,, 34-1-0.68
2-8 -4 5 S--6_I--E 2:99 .
3-1---15 S 60E 2_. 5__4
34~ O- S--60 E 2-..2__4
3.~4._.2 2
39_5_._6.3
4_ 5_L._05
- 1_65.95 3_06..._75
- 191_i._89 35_L.AT_
- 219_._85 4.0_0_.].0
3600,
3-70 O. 3-5-7-7-.-9-3
3800. 3663-.6 5
33--4-5 S--59 E 0.61
..32--4. 5 S__60__E
3-1 ,' 0 S 6.0_E 1..._7_4
5 O6_.23
559_._85
6_1.0.89
- ? .4_8_.__4_6 4 4'7 . 7 2
. . - 2 7 5_._5 1 49_.4_.257
- 3,03.....26 53_9_._1.8
~0.0.. 37.4.9.3-7
__ 4000. 383-4-..8 6-
31 0 S--6 I_E 0 - 51
3-1 -15 S A i_-E 0,2_4
3.2 '0 S 60.E 0.9!
66.1.. 8.0_
7 !.3._09
765 ..'61
- 326_.23 58..4_.22
- 35_1._38 62_9_._6D
- 377.8_8___6_75.4_9
4 200. 4-00 4-.-0 0
43 0 0.. 4-0 8-.-L,.8_7
4400. 4.1-71-,5 0
32---30 S ~.l--F 0_._7_3
33 0 S, 61_E 0.49
33 15.-- S__62_.E 0.60
Rl_8
8..72 ._56
926_.6J
-403_.__9_3 72.2_.A8_
- 43.0_..3 3 7_7_0_._ 1.2_
- 4 56_._0_7 8.1_8 ._5_3
:'
4_2_56_..07 3~2__1. 5_ S__6.5 F 1 _._9_0
43.41-.-1-0 31__,45 S_66._E 0__, 7_2
4_4_2_5....4.-4 32 ~ 0 S 6 5 F 0_._91
q_7_8_...6_8 "
1..029_._81
1082_._Z3 '
- 42_8_,_6.2 .86_6..._8_9
- 5D_0_._03 '9_1__4_,_9_6
' - 52.2_,__73_9_6_3_._66
45'0-0-~ _ .
-. ....... 4 600.. _
' ,. 4-2_0 0.. '
B--PA L AS KAIN C
P.U-TJ--R-I-VER-WE.LL--N 0: '!-0.--1-1-13
.N ORIH--SbO P-E
ALA SK-,A
· NO_V_EMBLER B_,__1_9_6_9 SJJ_R_V_E Y D AY_F
VE_R T ! CAL_S. EC_LIOJ~L_C.OMP_U_T_EiD ALO_hLG£LO_S_UJ3_E
S PEJ~.R-Y- SUN_WSLL_SUR_V_EY ! -N-G' C ~ M P A N V
SO- g- 1 65-%0 .
R F CORD_]J3E~SUR_V_E Y
TFLUE
EASURED ¥_ER_T-I_CAL
DEPTH DEPTH
I blCLINA_T~O N . DIRECI_IObL_DO G-_LEG
SJ!VERI_TY
DE-G--M-I-N DEG DFG!IO0
VERTICAL
SF.CyION
R ECT ANGU LAP~_O~~
NORTH .~.O.U_ T H . FAST
4.800-; 45.01-.-86
4 9.010. . I 459.Q.O2
50-0Q _- 4_672_._43
34 '30 S 65 F_ ].go
3_4___4_5 S_65_ E - o_. 25
1 !3_7.49
· 1193i._10
!248_,_3_6
- 5k6___6 7 1_01~_~9_9
- 5_7_0_.__7_61 Q6_6_,_65
- 5_94 . 7 0 1 LL7_,-9_9
5 L0,0; ! 4~7 5 &.-85
5200 ' 4831.26
5_300-.-- _4_91.9_.
3_4 30 S 6.~ F 0.5_6.
g 4 30 5__6_4__F 0_.00
3._4 45 56_2 F 1._16
%03_., A 3
.359_._3_0
ZLi_5_._ZL9
-61
- 6__4_4_,36_1 Z1_9__,_8_0
-_67 L./2__1_2_7_0_,_1._3
54_.0_0.. 5_0 Ol. 3_4
55.00.:
56_0_0._- 5 ! 67.3 9
35___0 S __6__4F 1._17
33 45_ S 63 F 1
'~_4_ _O. S 6.2 F 0.61
1A7_1_,._6_6
15_2_6_,2_6
15_81 ..3_8
- 6_9_6_,_2_6 L3.Zl_,_6.8
- 7_2_ 1_,~_8__1._3_7_1_,_ 1_8_
-747.74 1420_,_5_6
5.7. 00_. __5250_ ._5 _4
580_0_. 53 3A__._16
59_0_0; 5A_18_._7___4
33 45
%3 15
32 !5.
S6.3 E. 0_'_61 1635_._9_8
S_62_ F 0_. 74 16_9_0_._03 m
6.3 _F 1_. 13 17_z~2_. 47
- 772_,_9_6__L4_7_0_,_0_6
- 7_9_8_.3_0____1_51_8_.__43
- 8 22.9 2__15_6_6_._02
60_00~ 5503.gl
610_0. 55~3_._18
6_20.0. 5631._28
3~ 15~6.? F
~ 0 ~.62 F
32__45, $61 E
0.53 1793_. 07
0_. 7 5 1.8~_8_.__7__6
0_. 5 g 19_02_,_2_4
- 84 7,3_8__L6/3_,_13
- 8__Z3_._5_5 L661_,_Z2
- 899.771 708_._ 5_3
_
6_ 3C0. 5_7_5_.~..43
6_40.0_. 5_836.09
6 5(tCL- 59!5.69
, 33 45 S_61 E
35 15' S60__F
q7 15 S 5g F
0 ._9_9 1_953~_L6
L,_6_0 2_01~_J_6
2.08 2074.'48
- 9_2_6_ 7._ //_/_7_53_._13
- g 55.561_8_0_3_..~_1
' 98 ~ 4_,_7_~_L8~ 8 ._9_9
6_60_0. 59_9A~'22
6_7_0 0 . 60.72..16
6800- 61_5_L..29
3.8 15
g8__1.5
%8__15
S_58 __F 1 ,_17 21-3_6:__09
S_58__E 0_,D_0 , _2_19_7_,_6_9
S___5_8 E ' 0_._0_0 _2._2_5_9_._3_0
- 1_.0__1 g ,__5_5 l_9_!_k, 4_9
-1_0_52_,__3_.5 !_9.6__4__,_0_0
- ]._Q_8_.5_,_!. 62Q_1_6_, _5_0
6 e~.0 O _-
__.7.0.00 ..... -63_1.0_.2.2
;
.__.7_1 Q0 63_9.0_..._3.5
37 45
37. 0
36 ~_5
S. 5_7__F 0_.,_7_9 .... 23_2_0_, 3_2
S 5_4 E 1_,_9_6. 23_8_0_,_4_8
S__5_2F 1_,_22 2440.31
- 1_1_L8_._5_0__20_6_7_,_8 _4.
-1 153.88 2_k!.~_._53
-1190.71 2163.68
........ B--P--A LA-$.KA~I. N C
PAGE, 4
...... P U-T-T R-tV-ER--W EL-L--N 0.--t-0--I- 1-43-
---N 0 R-T H-. S L- CP-E-
..... AL-A$-K-A
NOVEMBER 3_,__.I9_6g.. $.U R VEY_D.-n. LT.F
_V.ER-T-I C AL--s EC_.TiO N._C.O I~_P_U_T.E D.._.A.L 0 NG_C LQ,S..UR E
.S p_E_ RR_y_~_S UN_W E_L_L__SU R-VE=Y-I-N G--C O~P-AN¥
S U- 3-165_3_0'
R~C-ORD--O F S.UI~V-E-Y
- - MEASURED . --
DE-P--T-H
TRUE I-NCLI-NATION DI-REgT ION DO G---L E.G
, VE~-T-I.CA L SEVEI~I-T-Y
DE-P-~H DE-G--M-I-N DE-G r'9_E~~0 .
V_ER_T_ICA L
R.E C_TANG U LA LC.O O.R_D..I_ N A_T_E_S
SE-C-T-LON N. QR-T H SOU T H - EASI W.E.S T
720.0-, . .. 64-70.'99
7.3-00. 655-1-o~89
--~40.0-. 6633.81-
· 3.6.--Z5 S5 3--E
36---~ S--5-O--E
35 ..... 0 S--50--E ~
0-,-7-7- .... 24 99-.-4 3
1~7-8-----255 8
0_,-9-9 26.1-5. ~7
- 1226.3 0.__2 21.0 ._9.0.
- 12_6 ~ ,_08___22__55_,_92,
- 13Q0._,_95 2299_,_8.7.
3.4---1-5 .... S--J+-9---E
3330 S---4-8--F
324.5 S-4-7--.E
0-.-9-4 267_1-._66
0.9-3 22-2-&.--/-0
0.o92_______2_7_80o.56
- l ~,37; 83_23_4_2_.3.4
- I_ 37~_._8 L_2.3.83_.36.
-1_411._._70_2/~2 2.,_9.3
7800,-~.6967.o35
7.900 ........ 7.04.9.26
800-0~-, 7-1-2-g-o-~9
33-.30 -- S _._4 6._F --
3.5 ...... 0 S..-4.6- F
36--4-5
0...92 .... 2.835...~2
L..49 .... 2.89.2.42
~._~~5-1~.63
--1.450.0ZL2462..63
--1489.88__2503.'89 .....
-153Z..92__Z5.~5_~.,4_5
8.10 O-.-- 72-07-.. 38 ,38--4,5
8-200.- -72.83o-98--- 4-0- 0
830.0.. .....7.360°8-7- --3.9--q 5
S.-43.- E.
S._4.2--F
S._4-1_--E
2'.09--30.13 .... 39
1-.-4.0- _ . 30.76 .... 63
0,,6 8- 3.139 ..... 3 2
- 1.5.78.. 7.0_.2588 ...14,
- 1.626..._4.7 2_ 63.1.,._1.5__
- 16_7_.q_._73__2 6.7.3,_10
8-40-0 ~. -- 7.-.4-38-.-85
8500 .... 7517 .... 9.2
8600 ..... 759.-~ .... 7-g
38--4-5 S---4-O--E
374 5 S._40_.E
3_7_0 S 40 .... E
!.-.-LB 320.Q-.A-7
1 _o.00.__.._3.2.60 2.8.
0_,..7_Zl. 33_]._9_..08_
-1722.~6..L23J_3..~A
-1Z69..58_2_752._69_
-1.815.._68._~79_Z.3.7
87.C0 ...... "/-67 8.-4 3..
880 0~__..52~59.o 8
8~qZ:LO-.--~~; 50
3.6--1. 5 ,S _40_E_,
35_30 S.__4.0_E
3_4--15 S_4_0 E
._75 3.3..T6._8_4 '
7_~ ' 3_~..3_3_..5_7
-_2__4 3 ILS.8~ 56
- 186.0_,_9.7___2 8 2.9_._38
- 19_05._.__4_6__286_6_._7_1
- 19__zt.8_,_5-7--~--~_02_,.8_8
' 9-0,00. .7:g.26,-13 .3.3--15
~1-00-- 8.0.1-0..47' 3-2 30
9200 ......... 8.0,96..19 3l ..... 0
g300~___--8i.8.3..0.Z __2.9--~5
........ :gq00 ...... 8271.30 ........... 28 ....... 0
...... --9500 .......... 8359.59 ................ 28 ...... 0 .............. S._32
:
1_.:]-4 35~1_~9_1
0---.-7-4 359__~_.. 19 ·
.1_. 8.3.. 36. _43.8.6_ ,
S_3_9 E
__S_39_F
S ._37_-E
~,-_36__F 1 3(,.__ 369.1 .... .48
S .._33 .... F 2 · Z7 _3735.7 8
- 19_9_l_,_L8_Zg_3.]_._39 '!
- 203 2 ,.9_q_2_9_71_, 2_0 i.
- 20_7_~_. Q7_3.002 .. 2.0_
E ............... 0.46 ...... 37.79.81 .....
-211~...22_~~0.31_..37__.
-.2153 .... 59..~0.56..93.
.=2.193.40 .... 30.81.81
...... B--P--A L-~ SKA--I NC
RAGF_ .5
........ P--U-T-T-- RI-¥E.R--~: E.L I_--N
..... NO FLY H--SLOP-E
~ A LA-S K A
N0_V_E M B F_~_~__1_9_6_9 _ SJJ.P~._E_Y__0A_T_E_'.
_V_E ~T_ LCALS_E_C_I'_I _0?6L_C_0J~ P_U_T_ED__ALO N_G C_L_0_.S_U..R_ .E
S.P-ER.R-Y ,~ SUN--WE.I.~UR_V-E-Y-I.N G __C.gNP_AN Y
. .
SU- 3-16.53_0
RE.COLR_DOF S_tJR_V E Y
TR-U E
.. MEASURED .VER-T_I-CAL
DEPTH. DEPTH
1_ NC_LI NA_T_IQN DI.R_EC_T_ION . D.0 G-_LEG_ '
SEV_ER_I_T__Y V ER_T_I_C_AL
O E.G__LV[I.N DE-G-__-__-.D_E_GLI_O_O S F C_.T !~N
R EC T A N G_U.L~LC, O_OR D. IN/LT_E_S
NORTH S~UTH CAST WEST .~.,~
9.60 0: ~ -q_~1_o-8-9
-- 910 0.-. ' 853_6_,-39.
9800 ...... 8625:o..09
2 8 . 0__ S--3 ! F O_,A6 3823_,_5_q
2 7 45 $_30 F 0_,_5~ 38 . 66_,_6_1
2 7 ~0 S.~.I__ E 0 . 52 3_9_09~62
- 2233_._6_4_3_L05_._9_9_
- 22_73_,_9_7__~],.2_9_._2_7
- 23_13_._5_5__3.1_53_._0_5_
. ' gq. OO. 82_L3~79
_ 1.fiO. O.O_. /8.802.'..89
'!0.1.0.0 ...... __8_892..58.
27 30 .S sO F .. (L_fi_6 3952_,.33
2_7 O. S 3_0 F 0_._4:9 3J_9_9_4_.33
2.6___15 , ' _S__2.9_E . , 0._._8_7 4_03_4_o 9 et
- 2333,54 3.12.6__1_4--
- 23~2.,_853_ L98.._8..4
' -_2_43_k.3_4 t22_0_,_2_8
!0_20.0_. ' 8.9.82 ~. 65 __ 2.54 5 ...... S__29E ,,. 0__._~9 _ _~03__4_.__83 , -
!O.300_- g.0_72_-_7_2____ ___25____~5 ...S_Z_9_E . 0_,_0_0 ZLLl__4_,_7_2 -_2_5~_7_,_5_~ 3_26.2_,_4__]
LC3.5 6_. q J~23_._5 7 2_4___4_5
l°5~ZO q.l~'J:O._o- · iq Y-O' re'J-.. ,S 80 IZo~ot- - -- '· Z.$;5'1 :o;:g 32.,~.0':.,~3 ~~'. _
.
·
.5.. '**** THF CALCUL/LT_I_0N_P_Rt3CED_URES_ARE_BASED_I3N T_kI_E_US_E~0F THE T_A_bLG_ENTIAL 0__R_C~H_0_FLQ_JVLE_T_H_0.D___*_*** .
.
H_OI~_,Z 0.N_T_AL_D_I_SP LACE~.EN_T : z~_]]6,__~] FEE_IT__AI SOU T H 5_2 O EG_, 19 M_I_N_,~_T_( T R U_E_L__
BP 10-11-13
Casing
3O
2O
.,~3-3/8
9-5/8
Wt/Ft
S tore
94
68/61
47
Grade
Pipe
H40
K55
N80
70
931
4589
10410
Stages
1
2
stage Tools
885
6504,2201
!S_t stage 2nd Stage
175 sks Fondu/Fly Ash --
2000 sks Fondu/Fly Ash --
3000 sks Cl. G~75% ~.'135 bbls mud and
CFR-2 150 sks Cl. G
1370 sks salt sat. 725 sks Cl. G/10%
Class G gel/l% CFR-2
.3rd Stage
140 bbls
mud
Form No. P---4
REV.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT O'F DRILLING
AND WORKOVER OPERATIONS
OTHER
1.
WELL WELL
2, NAME OF OPERATOR
BP ALASKA INC.
3. AD~)RESS OF OPI~ATOR
P. O. BOX 4-CCC, Anchorage, Alaska 99503
"4. LOCATION OF W~
1245' WEL, 1080' SNL, Sec 9, TllN, R13E, UPM
SUBMIT IN D~LIC.A.T~
AP1 NLr~IERICAL CODE
API 50-029-20023
LEASE DESiG]XtA ~ION A.X-D SERIAl. 1~O.
ADL-28281
?, IF INDIA~, ALOT1-EE OR TRIBE NAME
8.L~NIT,F.~:~ OR LEASE lq.~ME
Put River
9. WELL NO.
BP 10-11-13
10. F~:!.T~ AND POOL. OR WILDCAT
Prudhoe Bay
11.SEC., T., R., M., (BOI~OM HO12g
oamcTn~
Sec 10, TllN, R13E, UPM
12. PERMIT NO.
69-97
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET A_ND VOLU'NiES USED. PEI~OHATIONS. TESTS AND RESULTS, FISHING JOBS. JUNK IN HOLE AND SIDE-TRACKED HOLE
AiN-D ANY OTHER SIGNIFICANT CI-'IAN',GES IN HOI..~ CONDITIONS.
CONFIDENTIAL
OCtober 1969
1- 4
Drilled 17-1/2" to 3825'. Changed to 12-1/4" hole size for better
control of direction and drilled.to.4600'. Opened hole to 17-1/2"
to 4600'. Conditioned hole for casing.
5- 7
Ran and cemented.13-3/8" casing at 4589', with 3150 sacks Class G
cement. Displaced annulus to earthquake mud above 835'. Nippled
up BOPs.
Rigged up winterizing around pipe racks.
9 - 26
Drilled out. Drilled ahead 12-1/4" to 10420'.
27 - 29 Ran Schlumberger logs. Made wiper trip after DIL held up.
30 - 31
Conditioned hole for.casing. Ran 9-5/8" casing to 10410' and cemented
1st stage with 1370 sacks Class G salt saturated. Circulated for 2nd
stage,"
SIGNED
ii
Operations Manager DATE
November 13, 1969
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate
with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed.
CHARLES E. HAWK
PRESIDENT
('
SPERRY-SUN WELL SURVEYING
P.O. Box 6207 A~nex
.--,: ~ Anchorage~ Alaska 99502
November 11, 1969
~..
.
·
·
.,
C D MPANY
JOS. ¥. WILSON, JR.
SECRETARY-TREASURER
Mr. I~ike Allen
BP Alaska Inc.
121 W. Fireweed
Anchorage, Alaska
Re: Our Gyroscopic Multishot Directional
Survey SU-3-16530 on the North Slope
Well No. 10-11-13, Put River Area,
North Slope of Alaska.
Dear Mike:
We are. pleased to submit the original and one (1) copy of our Gyroscopic
Multishot Survey of the above well performed November 3, 1969.
The original survey folder contains the tabulation sheets, horizontal
projection~ time sheet, field data sheet and film.
We appreciate this opportunity to be of service to you and we hope our
service warrants your continued confidence.
Yours very truly, - .
SPERRY-SUN WELL SURVEYING COMPANY
Ted J. Ashby
District Manager
Enclosures
Form P~3
REV. 9-*30-67
in Triplicate
Submit
"Intentions"
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION: COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir.
Use "APPLICATION FOR PElq~IIT~" for such proposals.)
OIL [] GAS ~]
WELL WELL OTHER
2. NAME OF OP~:~_&TOR
_BP ALASKA
3. ADDRESS OF OPERATOR
P. O. Bo~ 4-CCC. Ane_hor~. Al~.~k..q qqs~2
4. ~ATION OF WRT-T, ~ ' ' - -
At surface
12~5 t ~L
13. EI,F~VATIONS (Show whether DF, I~T, GR. etc.
KBE 57.33 AMSL
Check Appropriate Box To [ndi,c~te Ntature of N~oti'ce, Re
HLB
TRM
OKG
API NUiVLF, RIC~ CODE KLV ----
50~02g~20023 .... _ HWK
ME DESIGNATION A~TD SEI~L4~ NRE L
ADL-28281
?. IF INDIA_N, ALLO'I-I'~:~: OR TRIBE
8. UNIT, FA1R~I OR LEASE NA1VIE
: BP 10w11~13
m. ~ ~ ~, oa w~
' Prudhoa Bay
u. SEC., T., m., ~.,
O~E~IVE)
Sec 10, TllN, R13E, UPM
12. P~T NO.
6q-q7
~rt, or Other 'Data
NOTICE OF INTENTION TO:
FRACTURE TREAT MULTIPLE COMPI,ETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
__
· UBSEQUENT REPORT OF:
WATER 8HUT-OFF ~ REPAIRINO WELL
FRACTURE TREATMENT ALTERINO CASINO
SHOOTING OR ACIDIZINO ABANDONMEKT*
(Other)
(NOTE: Report results of multiple completion on Well
~Other) Suspend Completion or Recompletion Report and Log form.)
15. DESCRIBEproposedPROPOSEDwork. OR COMPLETED OPERATIONS (Clearly state all pertlneut details, and give pertinent dates, including estimated date of starting any
We intend to suspend our subject well pending design of production facilities and
downhole completion arrangements.
The well status will be as follows:-
Depth c. 10420~ in 12-1/4" hole
Last casing string 9-5/8" od 47 lb/ft N80. Seal lock set at approx. 10400'
Cemented with 1370 sacks Class G salt saturated through the shoe,
850 sacks Class G, 10% gel, 1% CFR-2 through stage ~o.oiat c. 6500',
140 bbls Thixotropic mud on third stage from c. 2200'.
The casing will be cleaned out to the float collar but will 'not be perforated.
A drillable bridge plug will be set at c. 2200', above which the casing will
contain diesel.
(This space for S~~/~
CONmTmNS O~ i~R~V~L;~ AN~: '
TITLE 0~erations Manager
RECEIVED
P~Yi_S~ON OF Oa At~
DATE ~9
See l~nsfructions On Reverse Sid,e
Approved Copy
,Returned
BP ALASKA INC.
P. O. BOX 4-CCC
12! WEST FIREWEED LANE, SUITE 205
ANCHORAGE, ALASKA 99503
TELEPHONE 277- ! 422
October 28~ 1969
A-01335
US 7-2-10-11-13
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth, G~ief Petroleum Engineer
Gentlemen:
Well BP 10-11-13
Enclosed in triplicate is a Fonm P-3 advising of our intention to
suspend the above well pending design of production facilities and
downhole completion arr .angers.
You will note that on the enclosed forms we used the original API
NUn~rical Code and Well Number, pending advice from your office as
requested in our letter dated October 17, 1969, addressed to Mr.
Homer L. Burrell.
Very truly yours,
hw
Enclosures
cc: Mr. P. Hardwick, N.Y.
BP C.,-
Operations M~3n. ager
A-01009
US 7-2-10-11-13
BP ALASKA iNC.
P. O. BOX 4-CCC
12! WEST FIREWEED LANE, SUITE 205
ANCHORAGE. ALASKA 99503
TELEPHONE 277-1422
October 17, 1969
CO Fti) NTIAL
State of Alaska
Department of Natural Resources
Division of Oil & Gas
Alaska Oil & Gas Conservation Committee
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Chairman
Gentlemen:
Put River BP 10-11-13 R.D.
In reply to your letter of October 3 requesting a Completed Form P-7
showing the disposition of the drilling operation approved under Per-
mit No. 69-43, we enclose a "Sequence of Events" pertaining to the
above well and leading to the present situation.
We believe it possible that some confusion exists because of Items #1
and #4 on the list of events. These are not two different holes, but
the correction of an error in surface location when the rig was set
down in a sequence different from the original intention. The change
of bottom hole location was as a result of discussions between your
technical staff and ours, and related to the final position within the
block with a view to future spacing design.
Therefore, in spite of all the various correspondence which has taken
place, this has all related to the same physical hole in the ground,
and our rig is currently drilling in that same hole according to the
latest permit (Item #13, Permit #69-43).
The P-7 Form is your Completion Report, and this well is in fact not
yet complete. If it is now to be called BP 10-11-13 R.D. we appreciate
that BP 10-11-13 must be closed in the books, but we would appreciate
your advice as to the method.
HJC:hw
Enclosure
Very truly yours,
~Ci~
Operations Manager
Well BP 10-11-13
Sequence of Events
1. 4-17-69
2. 4-24-69
3. 5-3-69
4. 5-6-69
5. 5-15-69
6. 5-27-69
7. 6-10-69
8. 6-11-69
9. 6-17-69
10. 9-12769
11. 9-18-69
12. 9-30-69
13. 9-30-69
14. 10-3-69
15. 10-7-69
Form P-l, Application to Drill, submitted with plat and fee.
Surface location: 1245' WEL, 970' SNL, Sec 9, TllN, R13E
Bottom hole location: 2640' WEL, 2640' NSL, Sec 10, TllN, R13E
Received from State of Alaska approved copy of P-1
Bawden rig spudded 17-1/2" hole
Letter sent to State of Alaska amending surface location to:
1245' WEL, 1080' SNL, Sec 9, TllN, R13E, offering to revise Form
P-1 if necessary
Bawden rig suspended operations and rig released
Letter sent to State of Alaska referring to discussions between
Messrs. Stoneley and Allen and State of Alaska officials amending
the bottom hole location to 1980' WEL, 1980' NSL, Sec 10, TllN,
R13E, and asking State to amend original permit P-1
Letter received from State of Alaska re Fish & Game stipulations
for Well BP 10-11-13
Sundry Notice P-3 submitted, advising of our intention to suspend
with 20" casing set, using revised surface and down hole locations
Received from State of Alaska approved copy of P-3
Form P-l, Application to Deepen, submitted to State of Alaska for
revised and correct surface and bottom hole locations. New loca-
tion plats included, but no fee
Letter received from State of Alaska requesting a filing fee for
the new bottom hole objective
Letter sent to State of Alaska enclosing filing fee
Received from State of Alaska approved copy of~P-1 Application to
Deepen, quoting original permit No. and API numerical code
Letter received from State of Alaska amending Permit Number and API
numerical code, renaming well BP 10-11-13 R.D. and requesting P-7
Completion Report for surface hole which was suspended in May
Letter received from State of Alaska re Fish & Game stipulations
for well BP 10-11-13
u 2 1969
~i_VI~ION OF OIL AND OA§
Form No. P--4
REV. 9-3g-.~
STATE OF' ALASKA
OIL AND GAS CONSERVATION COMMII-i'EE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
3. ADDRESS OF OPERA. TOR
P. O. BOX 4-1395: Anchorage: Alaska
4. '.OCA=ON OF W~ At Surface:
1245' WEL, 1808' SNL, Sec 9, TllN, R13E, UPM
At Proposed .Production Zone
1980' E~L, 1980' NSL, Sec 10, TllN, R13E, UPM
SUBMIT IN DUPLICikTE
r~r,T I ~
9 ~J~ION OF OIL AND GAS
.q~iCflOl~gE
HLB ~
TRM
5. API NUA'I. ERICA. L CODE KLV ' ,~U '
~1%-I3~ q-~. 01]?_ ~-I'11 HWK
6. LEASE DESiGI~A~'i'ION A.~-D SL~I.~-L NO.
gnn-28281
7, IF INDIAJ~T, ALOTTEE OR TRIB~ii.::~4AME
Put River
g. WELL NO.
RP 1 0-1 ] -1 _q
10. ~'~ A_ND POOL, OR %VILDCAT
; Prudhoe Bay
ii.$~., T., R., M.. {BOTTOIVl HOI~
Sec 10, TllN, R13E, UPM
12, PER/VIIT N'O.
69-?7
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN I~OLE SIZE, CASING AND CEA~F2qTING JOBS INCLUDING DEPTH
SET ~ VOLUATES USED, PF~FOR3LTIONS, TESTS A1N-D 1RV. SULTS, FISHING JOB~, JLTNK IN HOLE AND SIDE-TRACKED HOLE
AJN-D /%NY OTHER SIGNIFICANT CIg~/~ IN HOL~ CONDITIONS.
September 1969
September 14 - 23 M~ved from BP 09-11-13 and carried out rig modifications.
September 24 - 26
Comuenced cleaning out through 20" casing at 0400 hours on
September. 24, 1969.
cleaned out 20" casing and drilled ahead 17-1/.2" to 1987'
september 27 - 30
Ban turbodrill with 17-1/2" bit. Drilled to 1992'
to 12-1~4" hole.
Drilled 12-1/4" to 2142', opened hole to 17-1/2".
17'1/2" to :3756'.
. Changed to
Drilled i
NOTE~Repor~ on ~his form is required for each calendar month, regardless of ~he slalus of operations, anO must ~ fJle~ in duplicate
wi~h Lhe Division of ~Jnes & Minerals by lhe 15~h of the succeeding month, unless o~he~ise directed.
Mr. H. J. Clarke
· Opera tions Manager
BP Alaska !nc.
P. O. Box 4-CCC
Anchorage, Alaska
Dear Mr. Clarke'
99503
October 7, 1969
Re- Put River BP lO-11-13
BP Oil Corporation,
Operator
In reference to the subject drill-site, the following stipulations are
required to preserve and protect fish and game resources-
I. Prior to the start of drilling a gravel Dad of thickness sufficient
to prevent degradation of permafrost will be constructed.
2. Access to this site will be only by an all-season gravel road
or by aircraft.
3. Prior to the beginning of drilling, a sump of sufficient size to
conta.in all waSte fluids will be constructed. This sump must be
lined with material impervious to oil and oil products at all
seasons during the year. Prior to abandonment of the site~, the
surr.,p must be cleaned of oil and covered.
4. The operator must-dispose of all waste~ including garbage, by
burning, with non-combustible material and unburned residue disposed
of in a manner and in a location acceptable to the Alaska Department
of Fish and Game~ i oe. in some local;ions burial may be necessary, in
others removal from the site may be required.
5. Sewage and waste water will be disposed of by lagooning or the
cesspool-se~.~c tank '~"- ~
'~-' n~hoct. N,o strea,~ or body of water will
have any sewage or waste ','~*~'~ added to it
6. At no ~ime will s~.~am~ bloc s
-"'r'- ' bm ked to fi h movement.
7. The Habitat Biologist's. _ Office~ ~0t8, West International. Air~ol~=
Anchorage~ Alaska 99502 will be notified prior to closing this
1 ocati on.
Si:a-' ; ap ~ e
cem,~.,t: The foregoin~ provffsions do not re]i.eve the I ssee and/or his
~'~ '"'~'"' ,,. .... ~ .~ ~..,~.,~b~iities or ~ovis'ions reauired by
cont, dc~J~ ~ or as~iq,'=,a~' of any res'~-c' ·
law or ,~u~ c~.-,.~ of Alaska or ~ne 1"ederal
°1969
DIVISION OF Olt AF~ 6AS
BP AlaSka INC.
P. O. BOX 4-CCC
12I WEST F'IREWEED LANE, SUITE 205
ANCHORAGE, ALASKA 99503
TELEPHONE 277-1422
September 30, 1969
A-00976
US 7-2-10-11-13
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Gentlemen:
BP 10-11-13
Enclosed as you requested is our check for an additional $50.00 to
accompany our application for permit to drill a new bottom hole for our
well BP 10-11-13.
hw
Enclosure
cc: Mr. P. Hardwick
Very truly yours,
Operations Manager
DIVI~ON OFOILAND_ ~
& b ~wio en~l.
BP ALaSka iNC.
P. O. BOX 4.CC¢
121 WEST FIREWEED LANE, SUITE 205
ANCHORAGE. ALASKA 99503
September 12, 1969
A-00795
US 7-2-10-11-13
State of Alaska
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Thomas R. Marshall, Jr.
Chief Petroleum.GeOlogist
Gentlemen:
Please find the following e~closed herewith:
Application for Permit to Drill, Deepen or Plug
Back (in triplicate),
Three copies of the surveyor's plat showing the
location of the above well.
Our $50 check to cover the permit filing fee was enclosed with our
original applicatiom for permit to drill the above captioned well.
Very truly yours,
HJC:hw
Enclosures
Operations Manager
S E P 171969
· ' SUBMIT IN TRII
1?_
STATE OF ALASKA
glYI$10N O~ OIL h~g gA5 %. '
OIL AND GAS CONSERVATION ,CO'MMIT~H0~GE
' APPLICAIION ~OR PERMIT.TO DRILL~ DEEPEN, OR PLUG 8ACK ' ~.~~.~.~o~s~~o.
~.. ~,~ o~ ~o' ADL-28281
DRILL ~ DEEPEN ~ PLUG BACK
w~ W~L~ or~ zo~ zo~ ·
~. NAME OF OP~TdR Put River
BP OIL CO.OPTION ~. W~LNO.
~. a~ ~ o~~ BP 10-11'13
P. 0. BOX ~-1395, ~C~O~¢E, ~8~ 99503 ~0. n~ ~N~ ~oo~. o~w~c~,
4. ~OCATIO~A~ ~urface OF W~ Prudhoo Bay
1265~ ~L, 1080~ S~ See 9, Tll~, R13E, ~P~ u.s~c..~.,
HOL~ O~CTIV~)
A~ pro~ed ~rod. zone
' Sec 10,
1980~ E~}.1980~..~SL~ S~c 10~ ~11~
1~. DISTANCE IN MI~ ~D DI~E~T~O~ ~10~ N~A~EST TOWN OR ~OST O~IC~· lg.
100 m~les ~.E. of
14. BOND I~O~ATION:
~ Statew~d~t~,~/o~o. ~ederal Insurance Co. 8016-77~i6 ~o~ ~100~000.00
DISTANCE FROM PROPOS~e J ' - ' ' 16 OF IN LEASE t7. NO. ACRES ASSIGNED
'~' ~A~ST 1980 from souther~ · NO. ACR~ ' -
LOCATION TO - -- ~ , ~ -I
VRO~ERrY O~ LE~SE LIN~, ~.Dounaary. Adjacent[ TO ~iS WELL
(Also to nearest drig unit ii any) '
, ,, .... lea~a held by BP J 2560
1~. DISTANCE FBOM PROPOMED ~CA~ON, ]l~. PROPO~ D~rH 30. ROTARY OR CABLE TOOLS
TO NEAREST WELL DRILLING, COMPLC~,
I
OR APPLIED FOR,
3920' from Put RiVer BP 09-11-13' 9275 (T~) Rotary
21. ELEVATIONS (Show whether DF, RT. CR. etc., ' ~. APPROX. DATE WORK WILL START*
An~rnx. 55 6aat (KR~I September 20~ 1969~
PROPOS~ CASING AND CEMENTING PROG~
, j .
SIZE OF HOLE .S..IZE OF CASING I WEIGHT PER FOOT ' GRAD~ SETTING DEPTH QUANTIT! OF C~MZN~
36 30' Stove Pive -- 80 80 400 'sacks Permafrost cement ~',~
26 20, .. 194 ~&,~ 900 900 . 3100. sacks Permafrost cement
17-1/2 13'3/8. "Gg"&~61 . ~g55 4570'4200 3200 sacks Class G in two sta§es~
12-114 g.5'/g , , /,7 ' 10490 '9275 1500 ,sacks G/salt; 800 sks G/gel~
DD TVD
*Surface hole drilled 17-1/2" to 1109', opened to 26" to 957',, cased with 20" casing to
931', suspended, under Permit No. 69-43. This submittal incorporates an application
for amendment of the bottom hole objective.
GEOLOGICAL FORECAST
TVD
Surface - 3800 feet Quaternary and Tertiary Gravels, sands and clays
3800 - 8420 feet Cretaceous and Jurassic Mudstones and sandstones
8420 - 9275 feet Triassic Sandstones, shales and limestones
IN ABOVE SP,~CE D~SCI~IBE i~IqOPOSED PROGRAM: If proposal is to deepen or plug back, give data on present productive zone and
proposed new productive ZOl~e. If proposal is to drill or d~epen direct ionally, give pertinen~ data on subsurface locations and measured and
true vertical dep.ths. Give blowout preventer program.
24.1 ~ereby certifp/'~/fhe]Foregoing i,~l'r,u, e an~ Correct
S, GNm'~ ~~_/~~,/ v...tm. ,September 12, 1969 rrr~ Attl)r..ney-in-Fact
(This space for State office uze)
j SAMPLES AND CORE CHIPS I~EQUII%~D~ Y~ ~ NO j
[ DI~ON~ SURVEY R~~ A.P.I. ~C~OD~
*~ I.~~, ~ Re~ ~d,
CONDITIONS OF APPROVAL, IF ANY:
OTHER REQUIREMEN'~:
SEE TRANSI~T~AL LETTER
'z3 -01
~[(~'-: ,f'=~ 9/30./69
,, v.rs Sept. 30, 1969
BP 10-11-13
D~V~$~ON OF O~t At,iD 0.~.,~
Dry bucket 36" hole to about 70' and cement 30" conductor to surface with
Permafrost cement.
Drill 26" hole to about 900' and cement 20" casing to surface with Perma-
frost cement.
Drill 17-1/2" hole to about 4570' drilled depth (4200' TVD) and cement
13-3/8" anchor string in two stages with Class G/fresh water slurry.
During this section of the hole angle will be built from a kick-off point
below the main gravel to a maximum value for the well.
Drill 12-1/4" hole to about 10490' drilled depth (9275' TVD) and cement
9-5/8" casing in two stages with Class G/brine slurry.
Blowout preventer program is2000 psi Hydril from 20" casing point and
3000 psi pipe rams, blind rams and Hydril from 13-3/8" casing point.
PAD DETAIL
DiRECTIONN_, ~---
4-I FI3 ~
plRECTIONA~~__
3-11-13
DIRECTIONAL
10;-11-13
255' 300'- ~
· I
1
DIRECTIONAL
SEC, 4,TIIN,IRI3E
DIVISION C
DIRECTIqNAL.
I
I
I
#.F_CO_R, NEiR FAD
LONe 148e 50~ 20~'
Y = 5,970,6961
X -' 645,
I
{
I
I
DIRE~.TIONAL
'§'EG'iO,? II N,R 13E
i
SECTION 25,4,9 end I0
1969
F OIL AND GA5
SCALE: I"=I/~MILE
CERTIFICATE OF SURVEYOR
I hereby certify that I am properly registered and
licensed to practice land surveying in the State Of Alaska (]nd
th(]t this plat represents a location survey m(]de by me or
under my supervision, and that oll dimensions and other
details are correct..
Date
e
R£VI$10N
WELL LOCATIONS
PUT RIVER
BP 03-11- 13
04-11-13
09-11 -13
I0-11-125
NOTE: Plat Revised June 18, 1969 From April 14, 1969 Plat.
Il I I I Il Illllll
WESTERN PAD
Located in
N.E,I/4 of p_r~ ~t~ac~d Sec.9.TIIN:RI3E: Ut~IAT MERIDIAN.. ALASKA
Surveyed for
BP OIL CORP
Surveyed by
F M. LINDSEY 8~ ASSOC.
LAND & HYDROGRAPHIC SURVEYORS
2502 West Northern Lights Boulevard Box 4-O81
Anchorage Aloskc
III I~
CHECK LIST FOR NEW WELL PERMITS
Company {~
Lease & Well No.'~/m /c /: /5
Yes No Remarks
!s wel 1 to be located in a defined pool .................
18. Does BOPE have sufficient pressure rating~? ~ ~ ~ "]:]"
Additional Requirements.' /d~.~~7 ~'-~- ' -'.' ~
.
'.
11
l~?'Wtl n r c e e u tr n ....
~"1 Cement cover a 1 l Pos Sibl'e '
15. Will surface casing cover all fresh
16. Will surface csg. internal burst equal .5 psi/ft, to next string .......
17. Will a11' casing give adequate safety in collapse and tension ......
i e "
rules apply
2. Do s ta tewi de .........................
3. Is aregistered survey plat attached ~ "~y'll''''?'-:'
4~,.~ Is well located proper distance from r per n ' ' ~Y~ "' -
' ' ' -
~ ~...~.ls well located proper distance from other wells ...... .'. .... - ·
:~ 6. Is sufficient undedicated acreage available in thi~ po01 ........ ~i ,
,~"7. Is well to be deviated ........... · -._:.- · -.~,- · - -"~..~- .... · ~ ~' - - _ ....
~.8. Is operator the only affected party ......... , ,-. .......
] 9. Can pemit be approved before ten-day wait . .
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information-of this
nature is accumulated at the end of the file under APPENDIX.
No special'effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
* ............................ .
.
....... SCHLUMBERGER .......
. ............................ .
COMPANY NAME : BP EXPLORATION
WELL NAME : J-2
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 50029200230~
REFERENCE NO : 97255
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
**** REEL HEADER ****
SERVICE NAFIE : EDIT
DATE : 97/06/19
ORIGIN : FLIC
REEL NAME : 97255
CONTINUATION # :
PREVIOUS REEL :
COMMENT : BP EXPLORATION, J-2, PRUDHOE BAY, API# 50-029-20023-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/06/19
ORIGIN : FLIC
TAPE NAME : 97255
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : BP EXPLORATION, J-2, PRUDHOE BAY, API# 50-029-20023-00
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NAME: J-2
API NUMBER: 500292002300
OPERATOR: BPEXPLORATION
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 19-JUN-97
JOB NUMBER: 97255
LOGGING ENGINEER: DECKERT
OPERATOR WITNESS: K. BARDWELL
SURFACE LOCATION
SECTION: 9
TOWNSHIP: lin
RANGE: 13E
FNL:
FSL: 1245
FEL:
FWL: 1080
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 57.30
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 9. 625 10410. 0 47. O0
2ND STRING 7. 000 9296.0 26. O0
3RD STRING 4. 500 9187.0 12.60
PRODUCTION STRING 2. 875 9339. 0 6.50
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: BCS
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
..............
88888.0
10171.5
10158.0
10124.0
10120.0
10119.0
10098.5
10084.5
10070.5
10051.0
10035.5
10034.5
10028.0
10013.0
10010.0
9995.0
9990.5
9981.5
9978.0
9960.0
9925.0
9896.5
9893.0
9868.5
9846.5
9822.5
9795.5
9792.5
9791.5
9782.0
9774 0
9770 5
9764 5
9761 5
9760 5
9759 0
9757.5
9756.5
9756.0
9750.0
9745.5
9736.0
9730.0
9725.0
9709.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH TDTP
..............
88885.5 88885.5
10169.0 10169.0
10154.5 10154.5
10121.5 10121.5
10117.0
10117.0
10095.0 10095.0
10082.0 10082.0
10067.5 10067.5
10048.0 10048.0
10031.5
10031.5
10025.0 10025.0
10010.0 10010.0
10007.5 10007.5
9992.5 9992.5
9988.0 9988.0
9979.5 9980.0
9975.0 9975.0
9956.5 9956.5
9922.0 9922.0
9893.0 9893.0
9890.0 9890.0
9866.5
9843.0 9843.0
9820.0 9820.0
9794.5 9794.5
9790.0
9780.0
9772.0
9769.0
9759.0
9757.0
9754.0
9748.0
9743.5
9734.0
9729.0
9724.0
9706.0
9790.0
9780.0
9772.0
9769.0
9763.0
9759.0
9757.0
9754.0
9748.0
9744.5
9734.0
9729.0
9723.5
9706.0
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
9700.5 9699.5 9699.5
9688.5 9688.0 9688.0
9679.5 9679.0 9679.0
9677.0 9677.5 9677.5
9661.5 9662.0 9662.0
9655.5 9656.0 9656.0
9648.5 9649.0 9649.0
9630.5 9630.0 9630.0
9618.5 9618.0 9618.0
9616.0 9615.0 9615.0
9609.5 9608.0 9608.0
9596.5 9596.5 9596.5
9592.5 9592.5 9592.5
9585.5 9586.0 9586.0
9579.0 9579.0 9579.0
9567.0 9567.0 9567.0
9553.5 9553.5
9553.0 9553.5
9541.0 9541.5 9541.5
9511.0 9511.0 9511.0
9508.0 9508.0 9508.0
9506.5 9506.5 9506.5
100.0 100.0 100.0
$
REMARKS:
CONTAINED HEREIN IS THE TDTP DATA ACQUIRED ON
BP EXPLORATION'S J-2 WELL. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #1 GRCH TO GR.BCS; AND PASS #1 SIGM
TO GR.BCS. ALL OTHER TDTP CURVES WERE CARRIED WITH THE
SIGM SHIFT.
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE ArUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SU~9~ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 10172.0 9400.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
TDTP 10196.0 9400.0
$
CURVE SHIFT DATA - PASS TO PASS(~IEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
GRCH TDTP
..............
REFLARKS: THIS FILE CONTAINS TDTP PASS #1. NO PASS TO PASS SHIFTS
WERE APPLIED TO THIS DATA.
$
LIS FORMAT DATA
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CI~SS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 506016 O0 000 O0 0 1 1 1 4 68 0000000000
SIGM TDTP CU 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TPHI TDTP PU-S 506016 O0 000 O0 0 1 1 1 4 68 0000000000
SBHF TDTP CU 506016 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
NAIV~E SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CI_d~S MODNUI~ S32.IP ELI~ CODE (HEX)
SBHNTDTP CU 506016 O0 000 O0 0 1 1 1 4 68 0000000000
SIGC TDTP CU 506016 O0 000 O0 0 1 1 1 4 68 0000000000
SIBH TDTP CU 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TRAT TDTP 506016 O0 000 O0 0 1 1 1 4 68 0000000000
SDSI TDTP CU 506016 O0 000 O0 0 1 1 1 4 68 0000000000
BACK TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
FBAC TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TCAN TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TCAF TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TCND TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TCFD TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TSCN TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TSCF TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
INND TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
INFD TDTP CPS 506016 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH TDTP GAPI 506016 O0 000 O0 0 1 1 1 4 68 0000000000
TENS TDTP LB 506016 O0 000 O0 0 1 1 1 4 68 0000000000
CCL TDTP V 506016 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 10193.500 SIGM. TDTP 16.165 TPHI.TDTP 25.275 SBHF. TDTP 42.625
SBHN. TDTP 47. 586 SIGC. TDTP 3 . 194 SIBH. TDTP 47. 586 TRAT. TDTP 1 . 646
SDSI. TDTP O. 580 BACK. TDTP 79. 072 FBAC. TDTP 32. 019 TCAN. TDTP 28484. 828
TCAF. TDTP 12275. 063 TCND. TDTP 24488. 629 TCFD. TDTP 8194. 754 TSCN. TDTP 5673. 051
TSCF. TDTP 2444.707 INND. TDTP 1679.322 INFD. TDTP 355.338 GRCH. TDTP -999.250
TENS. TDTP 1450. 000 CCL. TDTP 0. 000
DEPT. 9400. 000 SIGM. TDTP 25. 023 TPHI. TDTP 13. 835 SBHF. TDTP
SBHN. TDTP 45.217 SIGC. TDTP 0.117 SIBH. TDTP 45.217 TRAT. TDTP
SDSI. TDTP 1. 040 BACK. TDTP 168. 737 FBAC. TDTP 57.418 TCAN. TDTP
TCAF. TDTP 14085.760 TCND. TDTP 24584.234 TCFD. TDTP 12172. 420 TSCN. TDTP
TSCF. TDTP 2921 . 799 INND. TDTP 2074.507 INFD. TDTP 955.103 GRCH. TDTP
TENS. TDTP 1315. 000 CCL. TDTP O. 000
40. 633
1.300
27777.535
5761. 874
77. 875
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
**** FILE HEADER ****
FILE NAM~ : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
19-JUN-1997 12:02
PAGE:
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: 0. 5000
FILE SUA~ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 10172.0 9385.0
TDTP 10196.0 9385.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
88888.0
10191.0
10188.5
10186.0
10180.5
10172.5
10166.0
10163 0
10154 5
10151 0
10135 0
10128 5
10123 0
10120 0
10119 0
10111 0
10099 0
10098 0
10083.0
10082.0
10071.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH TDTP
..............
88884.0 88885.5
10188.5
10186.5
10182.5
10178.0
10169.5
10162.0
10159.5
10132.0
10117.0
10095.5
10080.5
10068.5
10151.0
10148.0
10126.0
10120.5
10117.0
10108.5
10094.5
10079.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
10069.5 10067.0
10058.5 10055.0
10055.0 10052.5
10053.5 10050.5
10051.5 10048.0
10051.0 10048.0
10035.0 10031.0
10034.5 10031.5
10028.5 10025.5 10025.5
10003.0 10000.0
9996.0 9992.5
9991.0 9988.0
9984.0 9980.5
9980.0 9977.5
9978.5 9975.0
9976.0 9973.0
9974.5 9971.0
9968.0 9964.5
9962.0 9956.5
9955.5 9952.0
9924.5 9921.0
9917.5 9915.0
9912.0 9908.5
9894.5 9893.0
9890.5 9890.0
9881.5 9878.0
9862.0 9858.5
9849.5 9845.5
9842.0 9839.0
9835.0 9832.0
9825.5 9822.5
9823.0 9820.0
9808.0 9806.5
9792.5 9790.5
9792.0 9790.0
9782.5 9780.5
9780.0 9777.0
9774.5 9772.0
9774.0 9771.5
9772.0 9770.5
9770.0 9767.5
9767.5 9765.0
9766.0 9763.5
9763.0 9759.0
9762.5 9759.0
9759.5 9757.0 9757.0
9751.0 9748.5 9747.5
9749.0 9746.0
9747.0 9744.5
9746.0 9743.0
9737.5 9734.5 9734.0
9735.5 9731.5
9732.5 9729.0
9727.0 9724 . 0 9723.5
9710.0 9706.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
9702.0 9698.0
9694.5
9691.0 9688.0
9690.5
9688.0 9685.0
9686.5
9683.0
9679.5 9678.0
9673.0 9671.0
9664.0 9662.0
9657.0 9656.5
9650.0
9641.0
9632.5 963 O. 0
9632.0
9627.5
9621.0 9618.5
9620.0
9618.0 9615.0
9611.5 9608.0
9610.5
9605.0 9602.0
9604.0
9601.0
9598.5 9596.5
9595.5
9588.0 9586.5
9584.0 9582.0
9581.0 9579.0
9574.0 9572.0
9570.0 9567.5
9568.0
9565.0
9560.5 9558.5
9550.0 9548.0
9543.0 9541.5
9537.5 9536.5
9535.5 9533.5
9532.5 9529.0
9513.5 9511.5
9509.0 9507.0
9506.0
9486.5 9484.5
9473.0 9469.5
9455.5 9453.0
9442.5 9440.0
9436.5 9433.0
9424.5 9422.5
9421.5 9420.5
9419.0 9417.0
9413.0 9412.0
9410.5 9410.0
100.0 99.5
9691.5
9687.5
9684.0
9680.5
9648.5
9639.0
9629.5
9624.5
9617.0
9607.5
9601.0
9598.5
9596.5
9593.0
9565.5
9563.0
9541.5
9505.0
99.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
REF~2~S: THIS FILE CONTAINS TDTP PASS #2. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2
SIGM TO PASS #1 SIGM. ALL OTHER TDTP CURVES WERE
CARRIED WITH THE SIGM SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 506016 O0 000 O0 0 2 1 1 4 68 0000000000
SIGM TDTP CU 506016 O0 000 O0 0 2 I 1 4 68 0000000000
TPHI TDTP PU-S 506016 O0 000 O0 0 2 1 1 4 68 0000000000
SBHF TDTP CU 506016 O0 000 O0 0 2 1 1 4 68 0000000000
SBHN TDTP CU 506016 O0 000 O0 0 2 1 1 4 68 0000000000
SIGC TDTP CU 506016 O0 000 O0 0 2 1 1 4 68 0000000000
SIBH TDTP CU 506016 O0 000 O0 0 2 1 1 4 68 0000000000
TRAT TDTP 506016 O0 000 O0 0 2 1 1 4 68 0000000000
SDSI TDTP CU 506016 O0 000 O0 0 2 1 1 4 68 0000000000
BACK TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
FBAC TDTP CPS 506016 O0 000 O0 0 2 i 1 4 68 0000000000
TCAN TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
TCAF TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
TCND TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
TCFD TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE: 10
NAME SERV UNIT SERVICE API API API API FILE NUA~ ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
TSCN TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
TSCF TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
INND TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
INFD TDTP CPS 506016 O0 000 O0 0 2 1 1 4 68 0000000000
GRCHTDTP GAPI 506016 O0 000 O0 0 2 1 1 4 68 0000000000
TENS TDTP LB 506016 O0 000 O0 0 2 1 1 4 68 0000000000
CCL TDTP V 506016 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 10193.500 SIGM. TDTP 16.059 TPHI.TDTP 24.693 SBHF. TDTP
SBHN. TDTP 46. 525 SIGC. TDTP 3. 513 SIBH. TDTP 46. 525 TRAT. TDTP
SDSI. TDTP O. 618 BACK. TDTP 135.105 FBAC. TDTP 43. 328 TCAN. TDTP
TCAF. TDTP 11530.965 TCND. TDTP 23499.500 TCFD. TDTP 7887.202 TSCN. TDTP
TSCF. TDTP 2346. 359 INND. TDTP 1635. 702 INFD. TDTP 342. 074 GRCH. TDTP
TENS. TDTP 1355. 000 CCL. TDTP O. 000
35.851
1.643
26715.285
5436.116
-999.250
DEPT. 9384. 000 SIGM. TDTP 25. 513 TPHI. TDTP 12. 837 SBHF. TDTP 44. 072
SBHN. TDTP 44. 566 SIGC. TDTP O. 000 SIBH. TDTP 44. 566 TRAT. TDTP 1 . 279
SDSI. TDTP O. 937 BACK. TDTP 196. 775 FBAC. TDTP 66. 726 TCAN. TDTP 27970. 988
TCAF. TDTP 14422.291 TCND. TDTP 24928. 992 TCFD. TDTP 12435. 865 TSCN. TDTP 5833. 726
TSCF. TDTP 3007.963 INND. TDTP 2384.556 INFD. TDTP 986.380 GRCH. TDTP -999.250
TENS. TDTP 1290. 000 CCL. TDTP O. 000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
11
FILE HEADER
FILE ~ER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0. 5000
FILE SUF~fARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 1 O172.0 9381.0
TDTP 10196.0 9381 . 0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
....... ---EQUIVALENT UNSHIFTED DEPTH ..........
BASELINE DEPTH GRCH TDTP
88888.0 88885.5 88886.0
10193.0 10191.0
10190.0 10188.5
10188.5 10186.5
10180.5 10178.5
10171.5 10169.5
10157.5 10155.0
10150.0 10147.5
10131.5 10129.5
10123.0 10120.5
10119.5 10117.0
10118.5 10117.0
10113.5 10111.5
10106.5 10103.5
10098.0 10095.5
10097.5 10094.5
10084.0 10082.0
10081.5 10080.0
10080.5 10079.0
10069.0 10066.5
10057.5 10055.0
10055.0 10052.5
10050.5 10048.0 10048.5
10039.0 10036.0
10034.0 10031.0 10031.5
10032.0 10029.0
10028.0 10025.0
10027.5 10025.0
10007.5 10003.0
10002.5 10000.0
9985.0 9983.0
9983.5 9981.0 9982.5
9980.0 9977.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE: 12
9978.0
9975.5
9973.5
9961.5
9929.0
9924 0
9923 0
9914 5
9911 0
9880 5
9861 5
9848 5
9846.0
9842.5
9839.5
9833.5
9830.0
9825.0
9817.5
9807.0
9806.0
9792.0
9784.0
9781.5
9779.5
9774.0
9771.5
9765.0
9762.0
9761.0
9758.5
9758.0
9757.0
9745.5
9744.5
9736.0
9733.5
9731.0
9726.0
9725.0
9699.5
9693.0
9689.5
9689.0
9686.0
9685.0
9682.0
9678.0
9657.5
9656.5
9650.0
9649.0
9639.5
9631.5
9630.5
9971.0
9927.0
9922.0
9804.5
9790.5
9780.5
9772.5
9770.0
9759.5
9757.0
9754.5
9743.0
9734.0
9724.0
9698.5
9688.5
9685.0
9677.5
9656.5
9649.5
9630.0
9975.0
9972.5
9958.5
9921.5
9911.5
9908 5
9878 0
9858 5
9845 5
9842 5
9840 0
9836.0
9831.5
9827.5
9823.0
9815.5
9806.0
9790.5
9782.5
9777.0
9763.5
9759.5
9757.0
9744.0
9731.5
9729.5
9723.5
9691.5
9687.5
9684.0
9680.5
9656.0
9649.0
9639.0
9629.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE: 13
9619.5 9618.5
9618.0 9617.0
9616.5 9615.0
9610.0 9608.0
9609.0 9607.5
9602.0 9601.5
9599.5 9598.5
9597.0 9596.5 9596.5
9593.0 9592.5
9586.0 9586.0
9582.0 9582.0
9568.0 9567.5
9566.5 9565.5
9564.0 9563.5
9560.0 9559.5 9560.5
9554.0 9553.5
9541.5 9541.5 9541.5
9537.0 9537.0
9512.0 9511.5
9507.0 9506.5
9505.0 9504.5
9468.5 9468.0
9435.5 9433.5
9410.0 9410.0
100.0 100.0 99.5
$
REMARKS: THIS FILE CONTAINS TDTP PASS #3. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3
SIGM TO PASS #1 SIGM. ALL OTHER TDTP CURVES WERE
CARRIED WITH THE SIGM SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
14
TYPE REPR CODE VALUE
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
..............................
** SET TYPE ~ CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
.......................................................................................
DEPT FT 506016 O0 000 O0 0 3 1 1 4 68 0000000000
SIGM TDTP CU 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TPHI TDTP PU-S 506016 O0 000 O0 0 3 1 1 4 68 0000000000
SBHF TDTP CU 506016 O0 000 O0 0 3 1 1 4 68 0000000000
SBHN TDTP CU 506016 O0 000 O0 0 3 1 1 4 68 0000000000
SIGC TDTP CU 506016 O0 000 O0 0 3 1 1 4 68 0000000000
SIBH TDTP CU 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TRAT TDTP 506016 O0 000 O0 0 3 1 1 4 68 0000000000
SDSI TDTP CU 506016 O0 000 O0 0 3 1 1 4 68 0000000000
BACK TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
FBAC TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TCAN TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TCAF TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TCND TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TCFD TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TSCN TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TSCF TDTP CPS 506016 O0 000 O0 0 3 I 1 4 68 0000000000
INND TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
INFD TDTP CPS 506016 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH TDTP GAPI 506016 O0 000 O0 0 3 1 1 4 68 0000000000
TENS TDTP LB 506016 O0 000 O0 0 3 1 1 4 68 0000000000
CCL TDTP V 506016 O0 000 O0 0 3 1 i 4 68 0000000000
** DATA **
DEPT. 10194.000 SIGM. TDTP 14.616 TPHI.TDTP 23.159 SBHF. TDTP
SBHN. TDTP 46. 994 SIGC. TDTP 4. 293 SIBH. TDTP 46. 994 TRAT. TDTP
SDSI. TDTP O. 655 BACK. TDTP 150. 801 FBAC. TDTP 49. 081 TCAN. TDTP
TCAF. TDTP 11655.240 TCND. TDTP 24087. 551 TCFD. TDTP 8059. 258 TSCN. TDTP
TSCF. TDTP 2401. 169 INND. TDTP 1704. 884 INFD. TDTP 345.292 GRCH. TDTP
TENS. TDTP 1365. 000 CCL. TDTP O. 000
DEPT. 9380.500 SIGM. TDTP 25. 448 TPHI. TDTP 11.251 SBHF. TDTP
SBHN. TDTP 44.102 SIGC. TDTP O. 022 SIBH. TDTP 44.102 TRAT. TDTP
SDSI. TDTP O. 934 BACK. TDTP 208.394 FBAC. TDTP 64.161 TCAN. TDTP
TCAF. TDTP 15909.~885 TCND. TDTP 26041 . 648 TCFD. TDTP 13104. 854 TSCN. TDTP
TSCF. TDTP 3215. 607 INND. TDTP 2168. 861 INFD. TDTP 966. 075 GRCH. TDTP
TENS. TDTP 1290. 000 CCL. TDTP O. 000
37. 385
1. 623
26801.168
5521. 478
-999.250
40.324
1.242
29590.051
5980.558
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
15
** END OF DATA **
**** FILE TRAILER ****
FILE NAFIE : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average
of edited static baseline passes for all other curves.
DEPTH INCREMENT 0.5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
..........................
1, 2, 3,
TDTP
$
REMARKS:
THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING
AND DEPTH CORRECTIONS WERE APPLIED.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE: 16
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 80
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 506016 O0 000
SIGM PNAV CU 506016 O0 000
TPHI PNAV PU-S 506016 O0 000
SBHF PNAV CU 506016 O0 000
SBHNPNAV CU 506016 O0 000
SIGC PNAV CU 506016 O0 000
SIBH PNAV CU 506016 O0 000
TRAT PNAV 506016 O0 000
SDSI PNAV CU 506016 O0 000
BACK TDTP CPS 506016 O0 000
FBAC TDTP CPS 506016 O0 000
TCAN PNAV CPS 506016 O0 000
TCAF PNAV CPS 506016 O0 000
TCND PNAV CPS 506016 O0 000
TCFD PNAV CPS 506016 O0 000
TSCN PNAV CPS 506016 O0 000
TSCF PNAV CPS 506016 O0 000
INND PNAV CPS 506016 O0 000
INFD PNAV CPS 506016 O0 000
GRCH TDTP GAPI 506016
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 0 4 1 1 4 68 0000000000
O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
17
DEPT. 10193.500 SIGM. PNAV 15.925 TPHI.PNAV 25.395 SBHF. PNAV 38.596
SBHN. PNAV 46.277 SIGC. PNAV 3. 435 SIBH. PNAV 46.277 TRAT. PNAV 1. 663
SDSI.PNAV 0.633 BACK. TDTP 79.072 FBAC. TDTP 32.019 TCAN. PNAV 27573.227
TCAF. PNAV 11705.818 TCND.PNAV 24082.113 TCFD.PNAV 8014.142 TSCN. PNAV 5596.297
TSCF. PNAV 2375.206 INND.PNAV 1668.558 INFD.PNAV 352.329 GRCH. TDTP -999.250
DEPT. 9400.000 SIGM. PNAV 25.297 TPHI.PNAV 12.671 SBHF. PNAV 39.514
SBHN. PNAV 44.063 SIGC.PNAV 0.215 SIBH. PNAV 44.063 TRAT. PNAV 1.282
SDSI.PNAV 0.996 BACK. TDTP 168. 737 FBAC. TDTP 57. 418 TCAN. PNAV 27925.148
TCAF. PNAV 14360.740 TCND.PNAV 24582.184 TCFD.PNAV 12249.080 TSCN. PNAV 5752.818
TSCF. PNAV 2958.058 INND.PNAV 2084.394 INFD.PNAV 946.336 GRCH. TDTP 77.875
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUP~vL~y
VENDOR TOOL CODE START DEPTH STOP DEPTH
TDTP 10217.5 9397.0
$
LOG HEADER DATA
DATE LOGGED: 25-MAY-97
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
18
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
CP 42.2
1352 25-MAY-97
10201.0
10202.0
9400.0
10196.0
1800.0
NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~A RAY
CCL COLLAR LOCATOR
TDTP THERMAL DECAY
TDTP THERMAL DECAY
$
TOOL NUMBER
CGRS 17
CPLC
TDIC
TDTP
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
10410.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 12000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 30000
TOOL STANDOFF (IN):
REMARKS:
CORRELATED TO SWS BHCS LOG DATED 28-0CT-1969.
AVERAGE DEVIATION AT PERFS = 26 DEGS.
PUMPED 41 BBLS METHANOL AND 243 BBLS SEA WATER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PRIOR TO LOGGING. FLUID LEVEL RISING DURING
LOGGING, BUT ABOVE GOC.(SEE LOG ANNOTATIONS).
GOC ESTIMATED AT 9960' ~D (10 FT DEEPER THAN
LOG DATED 11-21-93).
THIS FILE CONTAINS THE RAW TDTP DATA FOR PASS #1.
$
LIS FORMAT DATA
PAGE:
19
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 506016 O0 000 O0 0 5 1 1 4 68 0000000000
SIGM PS1 CU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TPHI PS1 PU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
SBHF PS1 CU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
SBHN PS1 CU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
SIGC PS1 CU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
SIBH PS1 CU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT PS1 506016 O0 000 O0 0 5 1 1 4 68 0000000000
SDSI PS1 CU 506016 O0 000 O0 0 5 1 1 4 68 0000000000
BACK PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
FBAC PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TCANPS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TCAF PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TCNDPS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
2O
NA~E SERV UNIT SERVICE API API API API FILE NUF~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUF~ SAMP ELEM CODE (HEX)
TCFD PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TSCN PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TSCF PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
INNDPS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
INFD PS1 CPS 506016 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS1 LB 506016 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS1 GAPI 506016 O0 000 O0 0 5 1 1 4 68 0000000000
CCL PS1 V 506016 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 10217.500 SIGM. PS1 26.063 TPHI.PS1 0.000 SBHF. PS1
SBHN. PS1 106.001 SIGC.PS1 0.000 SIBH.PS1 121.137 TRAT. PS1
SDSI.PS1 0.577 BACK.PSI 115.621 FBAC. PS1 47.132 TCAN. PS1
TCAF. PS1 0.000 TCND.PS1 -1302.566 TCFD.PS1 -529.985 TSCN. PS1
TSCF. PS1 0.000 INND.PS1 -3.930 INFD.PS1 -1.602 TENS.PSi
GR.PS1 96.063 CCL.PS1 0.000
DEPT. 9397.000 SIGM. PS1 25.023 TPHI.PS1 13.073 SBHF. PS1
SBHN. PS1 43.080 SIGC.PS1 0.194 SIBH.PS1 43.080 TRAT. PS1
SDSI.PS1 0.918 BACK.PSi 166.061 FBAC.PS1 59.179 TCAN. PS1
TCAF. PS1 14024.199 TCND.PS1 24830.738 TCFD.PS1 12252.582 TSCN. PS1
TSCF. PS1 2917.492 INND.PS1 2163.026 INFD.PS1 937.693 TENS.PSi
GR.PS1 77.750 CCL.PS1 0.000
94.361
0.000
0.000
0.000
920.000
40.467
1.307
27833.109
5790.196
1350.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02 PAGE: 21
FILE HEADER
FILE NUFIBER 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUM~ER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
10216.5 9382.5
TDTP
LOG HEADER DATA
DATE LOGGED: 25 -MAY- 97
SOFTWARE VERSION: CP 42.2
TIME LOGGER ON BOTTOM: 1352 25-MAY-97
TD DRILLER (FT) : 10201.0
TD LOGGER (FT) : 10202.0
TOP LOG INTERVAL (FT) : 9400.0
BOTTOM LOG INTERVAL (FT) : 10196.0
LOGGING SPEED (FPHR): 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
GR GAMMA RAY CGRS 17
CCL COLLAR LOCATOR CPLC
TDTP THERMAL DECAY TDIC
TDTP THERMAL DECAY TDTP
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
10410.0
PRODUCED FLUIDS
THERMAL
SANDSTONE
2.65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
22
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 12000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 30000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS LOG DATED 28-0CT-1969.
AVERAGE DEVIATION AT PERFS = 26 DEGS.
PUMPED 41 BBLS METHANOL AND 243 BBLS SEA WATER
PRIOR TO LOGGING. FLUID LEVEL RISING DURING
LOGGING, BUT ABOVE GOC. (SEE LOG ANNOTATIONS).
GOC ESTIMATED AT 9960' MD (10 FT DEEPER THAN
LOG DATED 11-21-93).
THIS FILE CONTAINS THE RAW TDTP DATA FOR PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
23
** SET TYPE - CHAN **
NAFIE SERV UNIT SERVICE API API API API FILE ~ NUF~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX)
DEPT FT 506016 O0 000 O0 0 6 1 1 4 68
SIGM PS2 CU 506016 O0 000 O0 0 6 1 1 4 68
TPHI PS2 PU 506016 O0 000 O0 0 6 1 1 4 68
SBHF PS2 CU 506016 O0 000 O0 0 6 1 1 4 68
SBHNPS2 CU 506016 O0 000 O0 0 6 1 1 4 68
SIGC PS2 CU 506016 O0 000 O0 0 6 1 1 4 68
SIBH PS2 CU 506016 O0 000 O0 0 6 1 1 4 68
TRAT PS2 506016 O0 000 O0 0 6 1 1 4 68
SDSI PS2 CU 506016 O0 000 O0 0 6 1 1 4 68
BACK PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
FBAC PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TCAN PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TCAF PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TCNDPS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TCFD PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TSCN PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TSCF PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
INNDPS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
INFD PS2 CPS 506016 O0 000 O0 0 6 1 1 4 68
TENS PS2 LB 506016 O0 000 O0 0 6 1 1 4 68
GR PS2 GAPI 506016 O0 000 O0 0 6 1 1 4 68
CCL PS2 V 506016
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
.0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 10216.500 SIGM. PS2 25.864 TPHI.PS2 0.000 SBHF. PS2
SBHN. PS2 111.786 SIGC. PS2 0.000 SIBH. PS2 128.501 TRAT. PS2
SDSI.PS2 0,377 BACK. PS2 326.366 FBAC. PS2 99.925 TCAN. PS2
TCAF. PS2 0.000 TCND.PS2 -3680.464 TCFD.PS2 -1119.748 TSCN. PS2
TSCF. PS2 0.000 INND. PS2 -11.094 INFD.PS2 -3.397 TENS.PS2
GR.PS2 110.250 CCL.PS2 -0.004
DEPT. 9382.500 SIGM. PS2 25.165 TPHI.PS2 11.921 SBHF. PS2
SBHN. PS2 45.656 SIGC. PS2 0.000 SIBH.PS2 45.656 TRAT. PS2
SDSI.PS2 0.948 BACK. PS2 207.606 FBAC. PS2 61.268 TCAN. PS2
TCAF. PS2 15079.424 TCND.PS2 25798.297 TCFD.PS2 13016.566 TSCN. PS2
TSCF. PS2 3140.110 INND.PS2 2147.220 INFD.PS2 997.713 TENS.PS2
GR.PS2 77.188 CCL.PS2 0.000
106.641
0.000
0.000
0.000
955.000
40.327
1.243
28507.266
5936.299
1270.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
19-JUN-1997 12:02
PAGE:
24
**** FILE HEADER ****
FILE NA~E : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUPmLARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10220.0 9378.5
TDTP
$
LOG HEADER DATA
DATE LOGGED: 25-MAY-97
SOFTWARE VERSION: CP 42.2
TIME LOGGER ON BOTTOM: 1352 25-MAY-97
TD DRILLER (FT) : 10201.0
TD LOGGER (FT) : 10202. O-
TOP LOG INTERVAL (FT) : 9400.0
BOTTOM LOG INTERVAL (FT) : 10196.0
LOGGING SPEED (FPHR): 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
GR GAMMA RAY CGRS 17
CCL COLLAR LOCATOR CPLC
TDTP THERMAL DECAY TD I C
TDTP THERMAL DECAY TDTP
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
25
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
10410.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
PRODUCED FLUIDS
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 12000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 30000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS LOG DATED 28-0CT-1969.
AVERAGE DEVIATION AT PERFS = 26 DEGS.
PUMPED 41 BBLS METHANOL AND 243 BBLS SEA WATER
PRIOR TO LOGGING. FLUID LEVEL RISING DURING
LOGGING, BUT ABOVE GOC. (SEE LOG ANNOTATIONS) .
GOC ESTIMATED AT 9960' FiD (10 FT DEEPER THAN
LOG DATED 11-21-93).
THIS FILE CONTAINS THE RAW TDTP DATA FOR PASS #3.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
19-JUN-1997 12:02
PAGE:
26
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
O0 000 O0 0 7 1 1 4 68 0000000000
DEPT FT 506016
SIGM PS3 CU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TPHI PS3 PU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
SBHF PS3 CU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
SBHlVPS3 CU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
SIGC PS3 CU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
SIBH PS3 CU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TRAT PS3 506016 O0 000 O0 0 7 1 1 4 68 0000000000
SDSI PS3 CU 506016 O0 000 O0 0 7 1 1 4 68 0000000000
BACK PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
FBAC PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TCANPS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TCAF PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TCND PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TCFD PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TSCN PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TSCF PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
INNDPS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
INFD PS3 CPS 506016 O0 000 O0 0 7 1 1 4 68 0000000000
TENS PS3 LB 506016 O0 000 O0 0 7 1 1 4 68 0000000000
GR PS3 GAPI 506016 O0 000 O0 0 7 1 1 4 68 0000000000
CCL PS3 V 506016 O0 000 O0 0 7 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
** DATA **
DEPT. 10220.000 SIGM. PS3
SBHN. PS3 45.656 SIGC.PS3
SDSI.PS3 0.948 BACK. PS3
TCAF. PS3 15079.424 TCND. PS3
TSCF. PS3 3140.110 INND. PS3
GR.PS3 107.438 CCL.PS3
DEPT. 9378.500 SIGM. PS3
SBHN. PS3 43.937 SIGC.PS3
SDSI.PS3 0.945 BACK. PS3
TCAF. PS3 14250.447 TCND.PS3
TSCF. PS3 2885.264 INND. PS3
GR.PS3 78.250 CCL.PS3
19-JUN-1997 12:02
PAGE: 27
25.165 TPHI.PS3 11.921 SBHF. PS3 40.327
0.000 SIBH. PS3 45.656 TRAT. PS3 1.243
207.606 FBAC. PS3 61.268 TCAN. PS3 28507.266
25798.297 TCFD. PS3 13016.566 TSCN. PS3 5936.299
2147.220 INFD.PS3 997.713 TENS.PS3 935.000
O.O04
12.761 SBHF. PS3
43.937 TRAT. PS3
65.444 TCAN. PS3
12293.590 TSCN. PS3
940.597 TENS.PS3
25.593 TPHI.PS3
0.000 SIBH. PS3
201.242 FBAC. PS3
24667.195 TCFD.PS3
2163.357 INFD.PS3
0.000
41. 730
1. 285
28046.223
5678. 471
1325. 000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/06/19
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/06/19
ORIGIN : FLIC
TAPE NAME : 97255
CONTINUATION # : I
PREVIOUS TAPE :
COif'lENT : BP EXPLORATION, J-2, PRUDHOE BAY, API# 50-029-20023-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/06/19
ORIGIN : FLIC
REEL NAME : 97255
CONTINUATION # :
PREVIOUS REEL :
COF~fENT : BP EXPLORATION, J-2, PRUDHOE BAY, API# 50-029-20023-00
11
11
1111
1111
11
11
11
11
11
11
11
11
111111
111111
666666
666666
66
66
66
66
66666666
66666666
66
66
66
66
666666
666666
66
66
66
66
"000000 .'
000000
O0 O0
O0 O0
O0 0o00
O0 0000
O0 O0 O0
O0 O0 O0
0000 O0
0000 O0
O0 O0
O0 O0
000000
000000
000000
000000
O0 O0
O0 O0
O0 0000
O0 0000
O0 O0 O0
O0 O0 O0
0000 O0
0000 O0
O0 O0
O0 O0
000000
000000
-7777777777
7777777777
7-7
77
77
77
77
77
77
77
77
77
77
77
55555555~5
55555555 5
55
55
555555
555555
55
55
55
55
55 55
55 55
555555
555555
'" 000000
000000
00 O0
00 00
O0 0000
O0 0000
00 00 00
00 O0 O0
0000 O0
0000 O0
00 O0
O0 00
000000
000000
7777777777 -
7777777777
77
77
'77
77
77
77
77
77
77
77
77
77
7777777777 44 44
7777777777. 44 44
77 44 44
77 44 44
77 44 44
77 44 44
77 4444444444
77 4444444444
77 44
77 44
7'7 44
77 44
44
CCCC M M CCCC
C MM MM C
C ~ M M C
C M M C
C M M C
C M M C
CCCC M ~ CCCC
pppP RRRR
P P R
P P R
PPPP BRRR
P R R
P P R
O O DDDD
I~ U U D D
R U U D D
U U D D
O U D D
U U D D
R UUUUU DDDD
H H OOO EEEEE
H H 0 O E
H H O O E
HHHHH O 0 EEEE
H H O 0 E
H H ODD EEEEE
*START* USER PCAL
MONITi]R SWS KLlOE37
*START* USER PCAL
MONITHR SWS KLlOE37
[10!07,60574]
APR 80. *START*
[10!O7,60574]
APR 80. *START*
JOB
dOB
SHiP SEQ.
SHIP SEQ.
1309 DATE
1309 DATE
12-AUG-80 01:03101
12-AUG-80 01:03101
VV VV EEEEEEEEEE HRRRRRR~
VV YV ELEEEEEEEE RRRRRRRH
¥¥ ¥¥ EE RR RR
VV VV EE RH RR
VV VV EE RR RR
VV VV EE RR RR
VV VV EEEEEEEE HHRRRRRB
VV VV EEEEEEEE RRRRRRRR
V¥ VV EE RR RR
VV VV EE RR RR
VV VV LE HH RH
VV VV EE RR RR
VV EEEEEEEEEE RH RR
VV EEEEEEEEEE HR RR
IIIIII
IIIIII
II
II
II
II
II
I1
II
Ii
Ii
IIIIII
IIIIII
YY
YY
YY YY
YY
YY
YY
YY
YY
YY
000000 000000 222222
000000 000000 222222
O0 O0 O0 O0 22 22
O0 O0 O0 O0 22 22
O0 0000 O0 0000 22
O0 0000 O0 0000 22
O0 O0 O0 O0 O0 O0 22
O0 O0 O0 O0 O0 O0 22
0000 O0 0000 O0 22
0000 O0 0000 O0 22
O0 O0 O0 O0 22
O0 O0 O0 O0 22
000000 000000 2222222222
000000 000000 2222222222
,START* USEH PCA6 [10707,60574] dOB SHiP SEQ.
MONITOR SWS KLlOE37 APR-80. ,START*
FILE: OSKH:VEBI~¥.00~<051>[10707 60574] CREATED:
PRINTED: 12 AUG 80 01:0~:16
QUEUE SWITCHES: /~'ILE:FORT /COPIE$:I
/$PACING:I /LIMIT:58 /FORMS:NORMAL
1log DATE 12-AUG-B0 01:03:01
12-AUG-80 01:02:07
SCHLUMBERGER COMPUTING CENTER
10707,60574
REEL HEADER
6ENGIH: 132 B~TES
REEL NAME: P.C.A.L.
SERV1CE NAME: EDIT
HEEL CONTINUATION NUMBER: 01
PREVIOUS REEL NAME:
COMMENTS: LIS FORMAT CUSTOMER TAPE
DATE: 80/ 8/11
TAPE HtADEH
LENGTH: 132 BYTES
TAPE NAME: 60574 DATE: 80/ 8/11
SERV1CE NAME: EDIT
TAPE CONTINUATION NUMBER: Ol
PREVIOUS TAPE NAME:
COMMENTS: UNIQUE WELL IDENTI~'ICATION NUMBER IS 50-029-20023-01
TAPE COMMENTS
DATE LOGGED 04-JUN-80/RUN NO. ]/DEPTH DRILLER 10361/TYPE FLUID CRUDE/
CAS1NG 9.625 @ 47 ~ N-80 10410-0/
EOF
FILE HEADER
LENGTH: 62 BYTES
FILE NAME: EDIT .001
MAXIMUM PHYSICAL RECORD LENGTH:
PREVIOUS FILE NAME:
1024 BYTES
WELL SITE INFORMATION RECORD
LENGTH:
CGMPANY:
WELL:
FIELD:
RANGE:
TOWN:
SECTION:
COUNTY:
STATE:
176 BYTES
SOHIO ALASKA PETRO. CO.
J-2
PRUDHOE BAY
13E
llN
9
N. SLOPE
ALASKA
DAI'A ~'U~MA1~ 6~'LCI~'ICATIUM
~NT~ ~bOCKS:
0
SIZE REP CODE ENTRX
I 66 0
DATUM SPECIFICATION ~L[3C1~6:
ENTRY
lC TOOL
1 DEP~
2 GB CNG
NPHI CNL
NRAT CNL
5 NCNL CNL
6 F'CNL CNL
7 GR CNL
8 NPH1CNL
g NRA~ CNL
10 NCNL CN~
~'CNL CNL
12 GR CNL
1] NPHI
N~A~ CNL
NCNL CNL
16 ~CNL CNL
SVORD# UNITS AP1 AP1 APl API FILE# SIZE EXP PROC SAM REP DEPT SHIFT
FT 0 0 0 0 0 4 0 0 1 68 0 0
GAPI 42 31 32 0 0 4 0 0 I 08 0 0
PU 42 68 3 0 0 4 0 0 1 68 0 0
C/C 42 42 1 0 0 4 0 0 1 68 0 0
CPS 42 34 92 0 0 4 0 0 1 08 0 0
CPS 42 34 9] 0 0 4 0 0 I 68 0 0
GAPi 42 31 32 0 0 4 0 0 1 68 0 0
PU 42 68 ] 0 0 4 0 0 I 68 0 0
C/C 42 42 1 0 0 4 0 0 ! ~8 0 0
CPS 42 34 92 0 0 ~ 0 0 1 68 0 0
CPS 42 34 93 0 0 4 0 0 1 68 0 0
GAPI 42 31 32 0 0 4 0 0 I 68 0 0
PU 42 08 3 0 0 4 0 0 1 68 0 0
C/C 42 42 1 0 0 4 0 0 1 b8 0 0
CPS 42 34 92 0 0 4 0 0 I 68 0 0
CPS 42 34 93 0 0 4 0 0 1 68 0 0
DEPTH
10175,000
10100.000
10000.000
9900,000
9800.000
9700.000
9600.000
9500.000
9400.000
LMONiC
GR
NCNb
NRAT
GR
NCNb
NRAT
GR
fCNL
NCNb
NRAT
fCNL
NCNb
GR
fCNL
NCNb
NRAT
GR
f"CNb
NCNb
NRAT
GR
fCNb
NCNb
NRAT
GR
FCNb
NCNb
NRAT
GR
FCNb
NCNb
NRAT
VAL
0
0
55
2
2O
24
55
2
15
27
61
2
14
28
61
2
14
36
66
1
UE
.500
.858
.770
.533
.300
.024
.341
.367
.000
.45b
.77b
.282
.200
,314
.77b
.144
.2O0
.894
.495
.781
17.000
45.903
72.501
1.574
87.70O
25.311
58.344
2.327
54.400
10.296
34.749
3.587
37.900
6.864
24.882
0.000
MNEMONIC
NPHI
GR
i~'CNb
NCNL
NPHI
GR
~'CNL
NCNb
NPHI
GE
FCNL
NCNb
NPHI
GR
FCNL
NCNb
NPHI
GR
FCNL
NCNb
NPHI
GR
F'CNL
NCNb
NPHI
GR
FCNL
NCNb
NPHi
GR
FCNL
NCNb
NPHI
GR
FCNL
NCNb
VALUE
0.000
20.800
22.308
54.912
22,100
17,400
24.024
56.199
18.900
15,000
2~.456
6 .776
18.000
13,200
29.172
61.776
12.060
13.900
36.894
66.495
700
44.616
72.072
19.820
88.600
26.598
56.628
42.440
56.400
10,296
35.178
49.160
41.900
7.293
0.000
MNEMONIC
NPHI
GR
f-CNL
NRAT
NPH1
GR
PCNL
NRAT
NPHi
GR
FCNG
NRAT
NPHI
GR
FCNb
NRAI
NPH1
GR
FCNL
NRAT
NPHi
GR
FCN6
NRAT
NPH1
GR
FCN6
NRA%'
NPHI
GR
FCNL
NRAI
NPH1
GR
f'CNL
VALUE
0.004
25.720
39.400
21.879
2.395
21.820
21.100
24.024
2.234
19.700
1~.000
2 .456
2.188
17.520
15.200
29.172
1.801
11,960
18.700
36.894
.b06
.800
19.I00
45.474
1.985
18.040
98.400
24.882
3.407
42.b60
56.600
10.296
3.812
47.240
0.000
0.000
MNEMONIC
NCNb
NRAT
NPHI
NCNb
NRAT
NPH1
NCNb
NRAT
NPHI
NCNb
NRAT
NPH1
NCNb
NRAT
NPHI
NCNb
NRAT
NPHI
NCNb
NRAT
NPHI
NCNb
NRAT
NPH1
NCNb
NRAT
NPHI
VALUE
0.858
2.586
24.600
55.341
2.415
21.080
62.205
2.282
19.740
bl.77b
2,i70
17.180
6b.924
1.793
11,940
501
9.040
57.48b
2.216
20.040
36.036
3.469
44.460
24.882
3.712
-5.000
SUMMAH~Y U~;' DATA RECORDS
NUMBEH O~ RECORDS: 104
I, ENG~H O~' RECORDS: 9bb BYTES
LENGTH O~' LAST RECORD: 390 BYTE8
TRAILER
LENGTH: 62 BYTES
~'ILE NAME: EDIT .001
MAXIMUM PHYSICAL RECORD LENGTH:
NEXT fILE NAME:
1024 BYTES
TAPE TRAILER
LENGTH: 112 BYTES
TAPE: NAME: 60574 DATE: 80! 8/11
SERVICE NAME: EDIT
TAPE CONTINUATION NUMBER:
NEXT TAPE NAME: ,
COMMENTS: UNIQUE WELL IDENTIFICATION NUMBER I$'50-029-20023-0~
Run 1'
21 - November - 1993
PDK-100tGR
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
J - 02
500292002300
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
06-DEC-93
4993.01
K. BRUNNER
J. BENNETT
9
llN
13E
1080
1245
57.30
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING 9.625 10410.0
3RD STRING 7.000 9296.0
PRODUCTION STRING 4.500 9350.0
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE: BHCS
PBU CURVE CODE: GR
RUN NUMBER: 2
PASS NUMBER: 1
DATE LOGGED: 03-MAY-69
LOGGING COMPANY: SWS
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH GRCH
9457.0 9457.0
9485.0 9486.5
9495.0 9494.5
9499.0 9500.0
9516.5 9517.5
9534.5 9536.0
9535.0 9536.5
95'36.0 9537.0
9537.0 9537.5
9547.0 9547.5
9547.5 9548.5
9548.5 9549.5
9551.5 9552.0
47.00
26.00
12.60
9556.0
9559.0
9562.0
9567.0
9571.5
9578.0
9581.5
9592.0
9608.5
9620.5
9621.5
9622.5
9623.0
9623.5
9624.5
9633.5
9635.0
9641.5
9643.0
9647.0
9679.5
9680.5
9681.5
9689.5
9693.5
9725.5
9727.0
9735.5
9738.5
9739.5
9768.5
9788.5
9789.5
9964.0
9964.5
9965.5
9970.0
9980.5
9985.5
9986.5
10018.5
10019.0
10020.0
10029.0
10029.5
10034.5
10035.5
10048.0
10051.5
10052.0
10055.5
10067 · 0
10121.5
10150.5
10168.5
10208.0
$
REMARKS:
9556.5
9559.0
9562.5
9568.0
9572.0
9579.0
9582.5
9592.5
9610.0
9621.5
9622.5
9623.0
9623.5
9624.5
9625.5
9634.0
9635.5
9642.5
9644.0
9647.5
9680.0
9680.5
9681.5
9690.0
9694.0
9727.0
9728.5
9738.0
9741.0
9741.5
9770.5
9790.0
9791.0
9966.0
9966.5
9967.0
9971.5
9982.5
9987.5
9988.0
10021.5
10022.0
10022.5
10031.5
10032.5
10037.5
10038.0
10050.0
10054.0
10055.0
10058.5
10069.0
10123.5
10153.5
10170.5
10208.0
PDK-100/GR
LOG TIED TO CBL DATED 24-MAY-77.
05-NOV-93 WELL TEST:
OIL = 1.02 MBOPD
WATER = 0.01 MBWPD
GAS = 7.62 MMSCFD
CHOKE = 47.5
MFP = 2107 PSI @ 133 DEGF.
WELL SHUT-IN & THEN PUMPED 163 BBLS SEA WATER & 22
BBLS METHANOL.
FLUID LEVEL IN WELL WAS CHANGING FROM 9650 TO 9720.
A BOREHOLE-DIFFUSION CORRECTED SGMA CURVE IS PRESENTED
FOR EACH PASS. THE SGMA CURVE IS CORRECTED FOR A 12"
BOREHOLE, 9.625" CASING, & 25,000 ppm BOREHOLE FLUID
SALINITY. THE CORRECTED CURVE IS CALLED "SGNT".
OPEN HOLE GAMMA RAY FOR DEPTH MATCHING DOWNLOADED FROM
BP EXPLORATION UPS/CSS DATABASE 03-DEC-93.
SHIFT PROCEDURE AS FOLLOWS:
1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE
GAMMA RAY.
2) FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST
PASS GAMMA RAY.
3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4) ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS SGMA.
/ ? ?MATCH1. OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER= 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA- PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: i
START DEPTH STOP DEPTH
9475.0 10182.0
9487.0 10194.0
BASELINE DEPTH
9457.0
9495.0
9499.0
9516.5
9534.5
9535.0
9537.0
9547.0
9547.5
9548.5
9551.5
9556.0
9559.0
9567.0
9578.0
9581.5
9592.0
9608.5
9612.5
9615.5
9618.0
9630.5
9639.5
9648.0
9679.5
9680.5
9681.5
9684.5
9688.0
9693.5
9723.5
9733.5
9743.5
9747.5
9754.5
9756.5
9759.5
9764.0
9768.5
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
SGMA
9457.0
9494.5
9500.0
9517.5
9536.0
9536.5
9537.5
9547.5
9548.5
9549.5
9552.0
9556.5
9559.0
9567.0
9579.0
9582.5
9592.5
9610.0
9614.0
9616.5
9618.5
9631.0
9640.0
9649.0
9680.0
9680.5
9681.5
9684.5
9689.0
9694.0
9725.0
9735.5
9745.0
9749.5
9756.5
9758.5
9761.5
9765.5
9770.5
9771.5
9780.0
9788.5
9789.5
9804.5
9835.0
9968.0
9975.5
9981.0
9984.5
10021.5
10025.0
10029.0
10031.5
10048.0
10051.5
10067.0
10095.5
10117.0
10150.5
10169.0
10172.0
10208.0
$
REMARKS:
9773.5
9781.5
9790.0
9791.0
9807.5
9836.0
9969.5
9977.5
9982.5
9986.0
10025.0
10028.0
10031.5
10034.0
10050.0
10054.0
10068.5
10097.5
10119.0
10153.5
10171.0
10175.0
10208.0
PASS 1.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
/ ? ?MATCH4. OUT
$
CN : BP EXPLORATION
WN : J - 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPES 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
15 Curves:
Name Tool Code Samples Units
1 GRCH PDK 68
2 BIF PDK 68
3 BKL PDK 68
4 BKS PDK 68
5 CSLS PDK 68
6 LS PDK 68
7 SS PDK 68
8 MSD PDK 68
9 RATO PDK 68
I GAPI
1
I CPS
I CPS
1 CU
1 CPS
1 CPS
1 CU
1
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 I
10 RBOR PDK 68 1
11 RICS PDK 68 1
12 RIN PDK 68 1
13 SGMA PDK 68 1
14 SGMB PDK 68 1
15 SGNT PDK 68 1
* DATA RECORD (TYPES 0)
Total Data Records: 101
CU
CU
CU
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
6O
966 BYTES *
Tape File Start Depth = 10208.000000
Tape File End Depth = 9457.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 24049 datums
Tape Subfile: 2 348 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 9475.0 10182.0
PDK 9487.0 10194.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: i
BASELINE DEPTH
9457.0
9479.0
9485.5
9492.0
9495.0
9500.0
9501.0
9502.0
9503.5
9508.0
9509.0
9510.5
9511.5
9516.0
9517.0
9517.5
9519.0
9535.0
9536.0
9545.0
9545.5
9553.0
9554.0
9554.5
9557.5
9562.0
9566.5
9567.5
9573.0
9573.5
9574.0
9575.0
9576.0
9577.0
9578.0
9581.5
9584.5
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH SGMA
9457.0 9457.0
9479.5
9488.0
9494.5
9501.0
9502.0
9502.5
9504.0
9510.0
9517.0
9517.5
9518.5
9519.5
9535.5
9536.0
9545.0
9546.0
9553.5
9555.0
9557.5
9562.5
9568.0
9574.0
9575.0
9576.5
9577.5
9579.0
9582.5
9491.5
9509.0
9511.5
9512.0
9516.5
9517.0
9545.0
9546.0
9553.5
9554.0
9566.5
9573.5
9574.5
9585.5
9585.5
9592.0
9597.0
9599.0
9602.0
9607.5
9608.0
9610.0
9611.0
9613.5
9616.5
9621.0
9622.0
9623.0
9624.0
9625.0
9627.0
9635.5
9636.0
9653.0
9654.5
9659.5
9670.0
9671.0
9673.0
9674.0
9677.0
9678.0
9687.0
9690.5
9692.0
9693.0
9693.5
9702.5
9717 · 5
9718.5
9719.0
9728.0
9734.0
9736.5
9737.5
9741.0
9741.5
9748.0
9754.5
9756.5
9758.5
9759.0
9761.0
9768.0
9780'0
9782.0
9782.5
9783.0
9785.5
9794.0
9795.5
9796.5
9798.0
9809.5
9592.5
9599.5
9603.0
9624.0
9624.5
9625.5
9627.0
9654.5
9678.5
9691.0
9693.0
9694.0
9719.5
9730.0
9737.0
9742.5
9743.5
9756.0
9758.0
9761.0
9770.0
9781.5
9787.0
9795.5
9586.0
9592.5
9598.0
9608.5
9609.5
9611.5
9612.0
9614.5
9617.0
9621.5
9622.0
9635.5
9636.5
9653.5
9660.5
9671.0
9671.5
9673.5
9674.0
9677.0
9687.5
9694.0
9704.0
9720.0
9721.0
9738.5
9739.0
9750.0
9760.5
9762.5
9783.5
9784.0
9784.5
9797.0
9798.5
9800.5
9812.0
9812.5
9818.5
9820.5
9828.0
9829.0
9847.5
9848.5
9851.0
9855.0
9855.5
9866.0
9867.0
9872.5
9873.5
9874.5
9925.5
9946.0
9950.5
9951.5
9952.5
9963.5
9964.0
9972.5
9978.5
9981.5
9982.5
9984.5
9985.5
9986.5
9988.5
9989.0
9992.0
9995.0
9996.0
10013.0
10017.0
10018.0
10019.0
10025.5
10026.5
10029.0
10032.0
10036.5
10037.0
10039.0
10042.0
10051.5
10052.5
10055.5
10056.0
10056.5
10057.0
10063.5
10064.0
10067.0
10068.0
10069.5
10070.5
10073.5
10075.5
9852.0
9965.5
9974.0
9980.5
9986.5
9987.0
9988.0
10015.5
10029.0
10035.0
10039.5
10044.0
10053.5
10055.0
10058.0
10058.5
10059.0
10059.5
10069.0
9814.5
9820.5
9822.0
9829.5
9830.0
9848.5
9849.0
9855.5
9856.5
9867.0
9867.5
9874.0
9875.0
9875.5
9926.5
9947.5
9952.0
9952.5
9953.5
9965.0
9983.0
9983.5
9989.5
9990.5
9993.5
9997.5
9998.5
10020.5
10021.5
10022.0
10028.5
10031.5
10039.5
10041.0
10059.0
10064.5
10065.0
10068.5
10071.0
10071.5
10074.5
10077.0
10086.0
10086.5
10087.5
10088.5
10091.0
10094.5
10095.0
10095.5
10096.0
10110.5
10111.5
10120.0
10120.5
10122.0
10132.5
101:35.5
101:36.5
10141.0
10151.5
10168.5
10172.5
10173.0
10174.5
10175.0
10187.0
10208.0
R~MARKS:
10113.5
10143.5
10154.0
10170.5
10176.5
10087.5
10088.5
10089.5
10090.0
10092.5
10096.5
10097.0
10097.5
10098.0
10112.5
10113.0
10121.5
10122.5
10124.0
10135.0
10138.0
10138.5
10174.5
10175.5
10177.0
10188.5
10208.0 10208.0
PASS 2.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH2. OUT
/ ? ?MATCH5. OUT
$
CN : BPEXPLORATION
WN : J - 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPES 64)
ONE DEPTH PER FRAME
Tape depth ID: F
15 Curves:
Name Tool Code Samples Units
i GRCH PDK 68
2 BIF PDK 68
3 BKL PDK 68
4 BKS PDK 68
5 CSLS PDK 68
6 LS PDK 68
1 GAPI
1
1 CPS
1 CPS
1 CU
1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 i
7 SS PDK 68 i CPS
8 MSD PDK 68 i CU
9 RATO PDK 68 1
10 RBOR PDK 68 1
11 RICS PDK 68 1
12 RIN PDK 68 1
13 SGMA PDK 68 i CU
14 SGMB PDK 68 i CU
15 SGNT PDK 68 I CU
* DATA RECORD (TYPES 0)
Total Data Records: 101
4 4
4 4
4 4
4 4
4 4
4 4
4 4
4 4
4 4
6O
966 BYTES *
00 201 24
00 201 24
00 201 24
00 201 24
00 201 24
00 201 24
00 201 24
00 201 24
00 201 24
1
1
1
1
1
1
1
1
1
Tape File Start Depth = 10208.000000
Tape File End Depth = 9457.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 24049 datums
Tape Subfile: 3 318 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9476.0 10182.0
9488.0 10194.0
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
BASELINE DEPTH GRCH SGMA
9457.0 9457.0 9457.0
9486.0 9487.0
9492.0 9492.5
9501.5 9501.5
9506.0 9507.5
9508.0 9509.0
9511.0 9512.0
9511.5 9513.0
9515.0 9516.5
9516.0 9517.5
9518.0 9519.0
9534.5 9536.0
9535.5 9536.5
9536.5 9537.5
9553.0 9554.'0
9554.0 9555.0
9555.0 9556.5 9555.5
9559.0 9559.5
9562.0 9563.0
9564.5 9565.5
9565.5 9566.0
9567.0 9568.0
9571.0 9572.0
9571.5 9572.0
9574.0 9575.0
9576.5 9577.5
9578.0 9579.5
9581.5 9583.0
9582.5 9584.5
9583.0 9585.0
9584.0 9585.5
9589.0 9590.5 9590.5
9590.0 9591.0 9591.0
9592.0 9593.0
9596.5 9598.0
9598,0 9599.0
9601.0 9602.5
9604.0
9605.0
9605.5
9608.5
9612.5
9617.0
9624.5
9626.5
9634.5
9643.0
9645.5
9646.0
9649.5
9661.0
9684.5
9686.0
9687.5
9690.0
9691.0
9692.5
9693.5
9702.5
9727.0
9745.5
9746.0
9749.0
9759.0
9763.0
9764.0
9767.5
9768.0
9769.0
9776.0
9777.0
9780.0
9790.0
9791.0
9791.5
9792.0
9794.5
9796.5
9798.5
9799.0
9799.5
9809.5
9822.0
9829.0
9830.5
9866.5
9872.5
9874.0
9875.0
9885.0
9904.0
9905.5
9906.5
9930.5
9945.5
9964.5
9972.0
9606.5
9607.5
9610.5
9614.0
9626.0
9627.5
9635.5
9647.5
9686.0
9687.5
9689.5
9691.5
9693.0
9694.5
9729.5
9748.0
9749.0
9752.0
9761.5
9771.5
9782.0
9792.0
9966.5
9974.0
9605.5
9607.5
9614.5
9618.0
9644.0
9647.0
9651.0
9663.0
9695.5
9705.0
9765.5
9766.0
9769.5
9770.5
9778.5
9779.0
9793.0
9793.5
9794.0
9796.5
9799.0
9801.5
9802.0
9803.0
9813.0
9824.0
9831.0
9832.0
9868.0
9874.5
9876.0
9876.5
9886.5
9906.0
9907.5
9908.0
9932.0
9947.5
9972.5
9973.0
9975.5
9976.5
9981.0
9986.0
9988.5
9989.0
9992.5
9995.0
10001.0
10018 · 5
10025.0
10026.0
10028.5
10032.0
10036.5
10039.0
10040.0
10041.5
10046.5
10049.0
10051 · 5
10052 · 0
10056.0
10057 · 5
10058 · 5
10062 · 5
10065.5
10068.0
10069.5
10070.5
10073 · 0
10078.0
10099.0
10100.0
10104.0
10104.5
10105.0
10105.5
10116.5
10122.5
10131.0
10132.5
10133.0
10136.0
10137.0
10138 · 0
10138 · 5
10139.0
10140 · 5
10151.5
10162.0
10163.0
10168.5
10172 · 0
10172 · 5
10174 · 5
10175.0
10175.5
9975.0
9983.0
9988.5
10021.5
10028.0
10035.5
10040.0
10044.0
10049.0
10052.0
10054.5
10055.5
10059.5
10070.5
10119.0
10154.5
10165.5
10171.0
10176.5
10177.0
9974.5
9975.5
9978.0
9978.5
9990.5
9991.5
9995.0
9998.0
10004.0
10022.0
10029.5
10031.5
10042.0
10042.5
10054.0
10055.0
10060.5
10061.0
10065.0
10067.5
10071.5
10072.0
10074.5
10080.5
10101.5
10102.0
10106.0
10107.0
10107.5
10108.0
10125.0
10134.0
10135.5
10136.5
10139.5
10140.0
10140.5
10141.5
10142.5
10144.0
10165.0
10165.5
10174.5
10175.5
10177.5
10176.0
10178.0
10184.0
10186.5
10208.0
REMARKS:
10177.5
10208.0
10180.5
10186.5
10189.0
10208.0
PASS 3.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH3. OUT
/ ??MATCH6. OUT
$
CN : BP EXPLORATION
WN : J - 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPES 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
15 Curves:
Name Tool Code Samples Units
i GRCH PDK
2 BIF PDK
3 BKL PDK
4 BKS PDK
5 CSLS PDK
6 LS PDK
7 SS PDK
8 MSD PDK
9 RATO PDK
10 RBOR PDK
11 RICS PDK
12 RIN PDK
13 SGMA PDK
14 SGMB PDK
15 SGNT PDK
68 I GAPI
68 1
68 1 CPS
68 1 CPS
68 1 CU
68 I CPS
68 1 CPS
68 1 CU
68 1
68 1
68 1
68 1
68 i CU
68 i CU
68 I CU
* DATA RECORD (TYPES 0)
Total Data Records: 101
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
60
966BYTES *
Tape File Start Depth = 10208.000000
Tape File End Depth = 9457.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code~ 68 48098 datums
Tape Subfile: 4 297 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited Pass i gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: 0.5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
GRCH
PDK
$
REMARKS:
1
1, 2, 3
AVERAGED PASS.
$
CN : BP EXPLORATION
WN : J - 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
15 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PNAV 68 1 GAPI
2 BKL PNAV 68 i CPS
3 BKS PNAV 68 i CPS
4 BIF PNAV 68 1
5 CSLS PNAV 68 i CU
6 LS PNAV 68 i CPS
7 SS PNAV 68 I CPS
8 MSD PNAV 68 I CU
9 RATO PNAV 68 1
10 RBOR PNAV 68 1
11 RICS PNAV 68 1
12 RIN PNAV 68 1
13 SGMA PNAV 68 i CU
14 SGMB PNAV 68 I CU
15 SGNT PNAV 68 i CU
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 90 5
4 4 71 784 '90 5
4 4 71 784 90 5
6O
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 101
Tape File Start Depth = 10208.000000
Tape File End Depth = 9457.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 48098 datums
Tape Subfile: 5 122 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9474.0
PDK 9486.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SB SINKER BAR
PDK PDK-IO0
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
STOP DEPTH
10193.0
10205.0
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
21-NOV-93
FSYS REV. J001 VER. 1.1
1350 21-NOV-93
10355.0
10202.0
9490.0
10194.0
900.0
YES
TOOL NUMBER
2725XA
0.000
10410.0
0.0
SEAWATER
0.00
0.0
0.0
0
9700.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT): 0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 700
FAR COUNT RATE HIGH SCALE (CPS): 3200
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 1.
$
CN : BP EXPLORATION
WN : J- 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
23 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
I GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 G1 PDK 68 1 CPS 4
9 G2 PDK 68 1 CPS 4
10 GElS PDK 68 I CPS 4
11 ISS PDK 68 1 CPS 4
12 LS PDK 68 1 CPS 4
13 SS PDK 68 i CPS 4
14 MON PDK 68 I CPS 4
15 MSD PDK 68 1 CU 4
16 RATO PDK 68 i 4
17 RBOR PDK 68 1 4
18 RICS PDK 68 1 4
19 RIN PDK 68 i 4
20 SGMA PDK 68 i CU 4
21 SGMB PDK 68 1 CU 4
22 SGNT PDK 68 i CU 4
23 SPD PDK 68 I F/MN 4
4 06 511 09 0
4 00201 24 1
4 39 705 61 6
4 74 169 61 6
4 92 630 79 6
4 O0 201 24 1
4 O0 201 24 1
4 35 975 96 1
4 36 631 32 1
4 74 169 61 6
4 O0 201 24 1
4 71 162 89 6
4 05 626 89 6
4 32 125 68 0
4 O0 201 24 1
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 96 761 61 6
4 O0 201 24 1
4 O0 201 24 1
4 52386 28 5
92
* DATA RECORD (TYPES 0) 966 BYTES *
Total Data Records: 298
Tape File Start Depth = 10208.000000
Tape File End Depth = 9464.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
119547 datums
Tape Subfile: 6
372 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9474.0
PDK 9486.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SB SINKER BAR
PDK PDK-100
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
10186.0
10198.0
21-NOV-93
FSYS REV. J001 VER. 1.1
1446 21-NOV-93
10355.0
10202.0
9490.0
10194.0
9OO.0
YES
TOOL NUMBER
2725XA
0.000
10410.0
0.0
SEAWATER
0.00
0.0
0.0
0
9700.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT): 0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 700
FAR COUNT RATE HIGH SCALE (CPS): 3200
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 2.
$
CN : BP EXPLORATION
WN : J - 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPES 64)
ONE DEPTH PER FRAME
Tape depth ID: F
23 Curves:
Name Tool Code Samples units
i GR PDK 68 I GAPI
2 BIF PDK 68
3 BKL PDK 68 1 CPS
4 BKS PDK 68 I CPS
5 CCL PDK 68
6 CSLS PDK 68 1 CU
7 CSS PDK 68 1 CPS
8 G1 PDK 68 1 CPS
9 G2 PDK 68 1 CPS
10 GElS PDK 68 I CPS
11 ISS PDK 68 1 CPS
12 LS PDK 68 1 CPS
13 SS PDK 68 1 CPS
14 MON PDK 68 i CPS
15 MSD PDK 68 1 CU
16 RATO PDK 68 1
17 RBOR PDK 68 1
18 RICS PDK 68 1
19 RIN PDK 68 1
20 SGMA PDK 68 i CU
21 SGMB PDK 68 i CU
22 SGNT PDK 68 i CU
23 SPD PDK 68 I F/MN
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 06 511 09 0
4 4 00 201 24 1
4 4 39 705 61 6
4 4 74 169 61 6
4 4 92 630 79 6
4 4 00 201 24 1
4 4 00 201 24 1
4 4 35 975 96
4 4 36 631 32 1
4 4 74 169 61 6
4 4 00 201 24 1
4 4 71 162 89 6
4 4 05 626 89 6
4 4 32 125 68
4 4 00 201 24 1
4 4 23 260 40 0
4 4 23 260 40
4 4 23 260 40
4 4 23 260 40
4 4 96 761 61 6
4 4 00 201 24 1
4 4 00 201 24 1
4 4 52 386 28 5
mmmmmmm
* DATA RECORD (TYPES 0) 966 BYTES *
Total Data Records: 299
Tape File Start Depth ~ 10202.000000
Tape File End Depth = 9457.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 119643 datums
Tape Subfile: 7 373 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9476.0
PDK 9488.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SB SINKER BAR
PDK PDK- 100
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
10190.0
10202.0
21-NOV-93
FSYS REV. J001 VER. 1.1
1535 21-NOV-93
10355.0
10202.0
9490.0
10194.0
900.0
YES
TOOL NUMBER
2725XA
0.000
10410.0
0.0
SEAWATER
0.00
0.0
0.0
0
9700.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT): 0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 700
FAR COUNT RATE HIGH SCALE (CPS): 3200
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 3.
$
CN : BP EXPLORATION
WN : J - 02
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPES 64)
ONE DEPTH PER FRAME
Tape depth ID: F
23 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
i GR PDK 68
2 BIF PDK 68
3 BKL PDK 68
4 BKS PDK 68
5 CCL PDK 68
6 CSLS PDK 68
7 CSS PDK 68
8 G1 PDK 68
9 G2 PDK 68
10 GElS PDK 68
11 ISS PDK 68
12 LS PDK 68
13 SS PDK 68
14 MON PDK 68
15 MSD PDK 68
16 RATO PDK 68
17 RBOR PDK 68
18 RICS PDK 68
19 RIN PDK 68
20 SGMA PDK 68
21 SGMB PDK 68
22 SGNT PDK 68
23 SPD PDK 68
GAPI
CPS
CPS
CU
CPS
CPS
CPS
CPS
CPS
CPS
CPS
CPS
CU
CU
CU
CU
F/MN
4 4 06 511 09 0
4 4 00 201 24 1
4 4 39 705 61 6
4 4 74 169 61 6
4 4 92 630 79 6
4 4 00 201 24
4 4 00 201 24
4 4 35 975 96 1
4 4 36 631 32
4 4 74 169 61 6
4 4 00 201 24 1
4 4 71 162 89 6
4 4 05 626 89 6
4 4 32 125 68 0
4 4 00 201 24 1
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 96 761 61 6
4 4 00 201 24 1
4 4 00 201 24 1
4 4 52 386 28 5
92
* DATA RECORD (TYPES 0) 966 BYTES *
Total Data Records: 298
Tape File Start Depth = 10205.000000
Tape File End Depth = 9461.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
190996 datums
Tape Subfile: 8
372 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 9 is type: LIS
93/12/ 6
01
**** REEL TRAILER ****
93/12/ 6
01
Tape Subfile: 9 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 6 DEC 93 8:31a
Elapsed execution time = 57.61 seconds.
SYSTEM RETURN CODE = 0