Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
181-112
Ima.roject Well History File Cove.ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. i f L - J 1 2- Well History File Identifier Organizing (done) ~/ Two-Sided 1111111111111111111 o Rescan Needed 11I1111111111111111 OVERSIZED (Scannable) RESCAN DIGITAL DATA o Color items: o Diskettes, No. o Maps: o Grayscale items: o Other, NofType o Other items scannable by large scanner o Poor Quality Originals: o Other: NOTES: OVERSIZED (Non-Scannable) o Logs of various kinds o Other BY: BEVERLY ROBIN VINCENT r;;;~MARIA WINDY DATE:ß:,' 1 '0)/51 (Jl Project Proofing 1111111111I11111111 BY: -~ BEVERLY ROBIN ~SHERYL MARIA WINDY DATE:Cr'~, 0')/51 VIS Scanning Preparation s- x 30 = /5 D + 7 = TOTAL PAGES J~-7 BY: OBIN VINCENT SHERYL MARIA WINDY DATE: 1;)1), ())/Sl I5rv--- Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: .I )5"7- PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: -Á- YES _ NO BY: BEVERL\~:~~)VINCENT SHERYL MARIA WINDY DATEI3,-r:8/S/'Rh Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO BY: BEVERLY ROBIN VINCEN~~MARIA WINDY DATE/'}3 Q~.?'I ~ (SCANNING IS COMPlETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS .'( - 7V 11111111·11111111111 DUE TO QUALITY , GRAYSCALE OR COlOR IMAGES) ReScanned (individual page lspeciaf at1êf1tiol1] scanning {;ompleted) 1111111111111111111 RESCANNED BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: ISI General Notes or Comments about this file: Quality Checked (don,,) 111111111I/11111111 12/1 O/02Rev3NOTScanned. wpd • RECEIVED STATE OF ALASKA SEP 18 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO GCC la. Well Status: El Oil El Gas ❑SPLUG ❑Other ®Abandoned. ❑Suspended 1b. Well Class 20AAC 25.105 20AAC 25.110 ❑Exploratory 0 Stratigraphic 0 GINJ ❑WINJ ❑WAG ❑WDSPL 0 Other No.of Completions Zero ®Development'❑Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 8/22/2013' • 181-112 • 312-330 1 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/29/1981 ' 50-029-20634-00-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/15/1981 PBU Y-13 1479'FNL, 528' FEL, Sec. 33,T11N, R13E, UM 8. KB(ft above MSL): 85.54' 15.Field/Pool(s) Top of Productive Horizon: 899'FNL,4801'FEL, Sec. 33,T11N, R13E, UM GL(ft above MSL): 49.54' Prudhoe Bay/Prudhoe Bay ' Total Depth: 9.Plug Back Depth(MD+TVD) 689'FNL, 5137'FEL, Sec. 33,T11N, R13E, UM 3953' 3913' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 644290 y- 5948767 Zone- ASP4 11290' • 9645' ADL 028287. TPI: x- 640006 y- 5949266 Zone- ASP4 ' 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 639665 Y- 5949469 Zone- ASP4 None 18.Directional Survey: El Yes ®No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 2056' 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: DIL/BHCS/GR/SP, FDC/CNL/GR/Cal, CBL/VDL/CCL/Gr, Gyroscopic Survey - N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu yds Concrete 13-3/8" 72# L-80 Surface 2680' Surface 2680' 17-1/2" 3790 cu ft Permafrost II 9-5/8" 47# L-80 Surface 10357' Surface 8811' 12-1/4" 1202 cu ft Class'G', 133 cu ft Permafrost C 7" 26# L-80 9853' 11290' 8405' ; 9645' 8-1/2" 359 cu ft Class'G' 24. Open to production or injection? ❑Yes ®No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom;Perforation Size and Number): ' _ ND) 4-1/2", 12.6#, L-80 4131'-9939' 9779'/8345' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. � ��,� WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No SCANNED 2 12014. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED See Attached 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.07 RBEIMS DEC 16 201 ni\ None Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only 29. GEOLOGIC MARKERS(List all formations an kers encounter 30. FORMATION TESTS NAME MD TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test results. Attach separate sheets to this form,if needed,and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10385' 8834' None Shublik 10413' 8857' Ivishak 10506' 8936' Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Takahiro Kosaka,564-5994 Email: Takahiro.Kosaka@bp.com Printed Name: Joe Lastu Title: Drilling Technologist Signature: Phone 564-4061 Date: /1 5/13 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only WELL NAME: Y-13 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9830' Pull Plug —8743' Fish (2 WRP Elements) 9800' Cement Squeeze w/ 30 Bbls Class 'G' 9212' - 8200' Set Cement Plug w/ 69 Bbls Class 'G' 4131' Tubing Cut and Pulled 3974' Set EZSV 3953' Set Whipstock Y-13A, Well History (Pre Rig Sidetrack) Date Summary 06/01/13 SET 4-1/2"WHIDDON CATCHER SUB ON CA. SLIDING SLEEVE AT 9,713'MD. PULLED RK-LGLV'S FROM ST#3 (8,230'MD), ST#5(6,893'MD), &ST#6(5,168' MD). 06/02/13 PULL RK-LGLV FROM ST#7 (3,002' MD). SET RK-DGLV'S AT ST#7 (3,002' MD), ST#6(5,168'MD), ST#5(6,893' MD), &ST#3 (8,230' MD). PULL EMPTY 4-1/2"WHIDDON CATCHER SUB FROM 9,713' MD. EQUALIZE& LATCH 4-1/2"WFD SPECIAL CLEARANCE WRP @ 9,825'SLM (Sheared GR). 06/03/13 CURRENTLY PULLING OUT OF HOLE W/4-1/2"WFD SPECIAL CLEARANCE WRP. 06/04/13 T/I/0=207/139/299 temp=S/I Assist SL w/IA Injectivity test/TBG Test(Rig Prep) Pumped 162 bbls 80* crude down TBG while SL brushed. 06/04/13 PULL 4-1/2"WFD SC WRP(Slips intact, Missing all 3 elements) FROM 9,830'MD. TAG HARD BOTTOM @ 10,538'SLM W/3.50"WIRE GRAB(Recovered one element). UNABLE TO PASS 8,750' SLM (Station#2)W/4-1/2" D&D HOLE FINDER. BRUSH OUT TT W/4-1/2" BRUSH, 3.50"WIRE GRAB. LRS FLUSHED TUBING W/160 BBLS OF CRUDE. UNABLE TO PASS 8,750'SLM (Station#2) W/4-1/2" D&D HOLE FINDER. TAG HARD BOTTOM @ 10,538'SLM W/3.50"WIRE GRAB (No issues at 8,750'slm). TAG 3.75"CA. SLIDING SLEEVE©9,719'SLM/9,713'MD W/3.80"G-RING. 06/05/13 Pumped 50 bbls of 50*crude in multiple attempts to Pressure Test TBG while SLine moved a D&D Hole finder. PT TBG to 700 psi. SL in control of well. FWP=159/134/342 IA&OA=OTG. 06/05/13 SERVICED AND TESTED I/A(LEFT SIDE, NON-GAS LIFT SIDE). PASSED LEAK TIGHT TEST. WOULD NOT PASS LOW PRESSURE TEST. ROOM FOR VR LUBRICATOR. 06/05/13 SET 4-1/2" D&D HOLE FINDER AT 8,502'SLM. LRS PRESSURE TESTED TUBING AT 250, 500,&700 PSI (Pass). PULL 4-1/2" D&D HOLE FINDER FROM 8,502'SLM. NOTE:TWO ELEMENTS FROM 4- 1/2"WFD WRP LEFT IN HOLE. 06/07/13 VALVE FAILED PER HOT OIL. SVC IA TWICE. ONCE TO GET ON WELL AND AGAIN TO GET OFF WELL. IA NEEDS TO BE REPLACED. PLENTY OF ROOM FOR A VR LUBRICATOR. HOT OIL WAS ABLE TO RIG OFF IA. 06/07/13 T/I/O= 122/148/273 ( Injectivity Test) Rig to TBG. Pump 10 bbls neat meth down TBG followed by 293 bbls 1% KCL @ 5bpm not to exceed 2000 psi on TBG or 1500 psi on IA. Shutdown/Pump 38 bbls diesel down TBG @ 1 bpm for freeze protect. Rig to IA call grease crew. 06/08/13 Called grease crew unable grease get IA valve to hold. Rig down until) IA valve is replaced. FWHP= 0/103/303. SV/W/SSV=C. M=0. IA/OA=OTG. 06/12/13 TAG TT @ 9942'SLM (9947' E-LINE MD=-5'CORRECTION.). RAN SPECIAL CLEARANCE WRP- 3.69" OD SET @ 9825' SLM. GR CAME BACK W/PLASTIC COATED TBG IN IT. 06/14/13 T/I/O=30/30/200.Temp.=SI.WHPs(Eval IAP).AL SI.ALP=5 psi. IA FL @ surface. Bled IAP from 30 psi to 5 psi in 7 hrs 10 min. Bled TP from 30 psi to 3 psi in 3 hrs 43 min. (8 bbls total). Monitored 30 min. Final WHPs=4/21/200. SV,WV=C. SSV,MV=0. IA&OA=OTG. NOVP. 1630 hrs. Page 1 of 4 Y-13A, Well History (Pre Rig Sidetrack) Date Summary 06/15/13 T/I/O=6/26/230.Temp=SI. Bleed WHPs to 0 psi (pre rig).AL SI @ casing valve,ALP=5 psi.TBG&IA FL @ surface. OA FL=near surface. Bled WHPs to 2/13/200 in 7.5 hours. Monitored for 30 minutes, pressures increased to 8/18/217.Job in progress. Final WHPs=8/18/217. **Note**No wellhouse,WV Flagged and tagged. SV, WV=Closed. MV, SSV=Open. IA&OA=OTG. NOVP. 04:30. 06/15/13 T/1/0=7/30/210.Temp.=SI. Bleed WHPs to 0 psi (Pre-Rig)AL shut-in @ casing valve,ALP=5 psi. Bled OAP from 210 psi to 200 psi in 1 hr(fluid to surface). Bled IAP from 30 psi to 10 psi in 6 hours(gas& fluid=3.5 bbls). Grease crew serviced AL casing valve. Bled ALP from 5 psi to 0 psi in 1 hr 10 min. Operator took AL gas to the pit. Monitored for 30 min. Final WHPs=4/13/210. SV,WV=C. SSV,MV=0. IA&OA=OTG. NOVP. 1700 hrs. 06/16/13 T/1/0=0/18/210.Temp=SI. Bleed IAP to 0 psi. (Pre-Rig). IA FL @ Surface. Bled IAP from 18 psi to 4 psi in 5.5 hours, 142 gallons of fluid returned during IA bleed, rig down&monitor for 30 minutes. No change in TP or OAP during IA bleed&monitor, IAP increased 3 psi to 7 psi during 30 minute monitor. Final WHP's=0/7/210. SV&WV=C. MV&SSV=0. IA&OA=OTG. NOVP. 0400. 06/16/13 T/1/0=4/6/210.Temp.=SI. Bleed WHP to 0(Pre rig).AL SI @ manifold (diverted to the pit).ALP=0 psi. Bled TP from 4 psi to 0 psi in 4 hrs. 42 min. Bled IAP from 6 psi to 1 in 7 hrs 30 min. (IAP was a fluid and gas mix). Bled 3.25 bbls total. Monitor for 30 min (See Pump Log) Final WHPs=0/1/210. SV,WV=C. SSV,MV=0. IA&OA= OTG. NOVP. 1630 hrs. 06/17/13 T/I/O=2/18/210.Temp.=SI. Bleed WHP to 0 psi(pre rig).AL SI @ manifold&casing valve(Pad Op diverted AL to pit). Bled IAP from 48 psi to 0 psi in 5 min. (all gas). Kept open bleed for 1 hr. Monitor for 30 min. IAP pressured up to 2 psi. Continued bleed (fluid&gas mix),walking out bleed hose to tank every 15 min.(See Pump Log).After walking out bleed hose the IAP would drop to 0 psi, between 20 sec &30 sec later the IAP would gain 2 psi. and remain there till bleed hose was walked out again.Total bleed time for IAP=6 hr. 20min.(2 bbls)30 min monitor. Final WHPs=0/2/210. SV,WV= C. SSV,MV=0. IA&OA=OTG. NOVP. 1700 hrs. 06/20/13 T/I/0=MV locked out/33/210.Temp= SI. Bleed IA&OA to 0 psi. (Pre-Rig). IA\&OA FL's=near surface. See Log for details. Final WHP's=SI/3/210. SV, WV&MV=C. SSV=0. IA&OA=OTG. NOVP.0410. 06/21/13 T/I/O=S1/3/210. Temp=SI. Bleed IAP to 0 psi. (Pre-valve CO, Pre-rig). MV locked out. IA&OA FL's Near surface.Wellhouse, flowline&AL line all removed. Bled IAP from 3 psi to 0 psi in 10 minutes, still getting fluid to surface. Rig up AL gas to purge, See log for details. Final WHP's=SI/3/210. SV,WV&MV=C. SSV=0. IA&OA=OTG. NOVP 04:00. 06/23/13 T/I/O=3/3/200. Conducted PJSM. Barriers= I/A gate valve.Verified by Performing LTT; no observable flow(Passed). Removed I/A blind flange, rigged up VR lubricator#02 w/3"Gray VR plug to I/A valve. PT'd lubricator against I/A gate 200 psi low&3500 psi high for 5 minutes each (Passed); set 3"Gray VR plug; PT'd VR plug 200 psi low&3500 psi high for 5 minutes each (Passed). Rigged down lubricator and 3 1/8"x 3 1/8" FMC Mod. 75 I/A valve; installed new 3"CIW gate valve.Torqued flange to API spec, rigged up VR lubricator; PT'd I/A flange x TBG head thru lubricator 200 psi low&3500 psi high for 5 minutes each (Passed), charted and saved in TRP folder. Pulled VR plug, closed gate valve, rigged down lubricator. Installed tap blind and torqued flange to API spec, PT'd flange 200 low&3500 high for 5 minutes each (Passed), charted and saved in TRP folder. 06/24/13 PULL 3.69" SPECIAL CLEARANCE WRP FROM 9807'SLM. Page 2 of 4 Y-13A, Well History (Pre Rig Sidetrack) Date Summary 06/24/13 T/I/0=236/0/200 LLR on IN MIT-OA to 2000 psi (Rig prep) Pumped 30 bbls crude to catch pressure pumped 15 bbls crude to establish a LLR of 172 psi @ 1 bpm down IA. Pumped 2.9 bbls crude down IA to reach test psi 2nd attempt 1st 15 min lost 39 psi.2nd 15 min lost 25 psi for a total loss of 64 psi in 30 min test. 06/25/13 T/I/0=236/0/200 MIT-OA to 2000 psi(Rig prep) Pumped 0.1 bbls crude to repressure OA to 2000 psi OA lost 26 psi in 1st 15 min. lost 16 psi in 2nd 15 min for a total loss of 42 psi in 30 min test. Bleed back—2 bbls Final WHP's 280/29/200 SV,WV, SSV=closed MV,IA,OA=open PAD op notified on departure. 06/27/13 T/I/0=120/35/200.Assist SLB with cement squeeze. Pumped 5 bbls neat methanol. SLB pumped cement job per procedure. Pumped 142 bbls dsl to displace cement from CH2MHILL tanker#30018. FWHP= 1000/830/287. 06/27/13 T/I/0----250/40/201 FULLBORE CMT, PREFORM CMT SQ JOB, PLANNED TOC IN TBG @ 9,800' MD. PUMP 30 BBLS OF 15.8#CMT& DISPLACE W/142 BBLS DIESEL.T/I/0--1,000/997/724. 07/04/13 TAG CEMENT PLUG @ 9479'SLM W/2.495"CENT& 1.75"SAMPLE BAILER. RECOVER CEMENT SAMPLE. LRS PERFORM PASSING CMIT-TxIA TO 3000 PSI. (witnessed by aogcc inspector jeff turkington). REPEAT TAG CEMENT PLUG @ 9482'SLM W/2.495" CENT& 1.75"SAMPLE BAILER. RECOVER CEMENT SAMPLE. (witnessed by aogcc inspector jeff turkington). PULLED STA#1 RK- DGLV FROM 9212'MD.*******POCKET LEFT OPEN*********** BRUSHED BPV PROFILE W/4-1/2" BRUSH, 2.56"SWEDGE. 07/04/13 T/I/O 535/822/202 Temp=SI Assist Slickline(Pre sidetrack)CMIT-TxIA PASSED to 3000 psi.AOGCC witnessed by Jeff Turkington. Pump 8 bbls diesel to achieve test pressure.Tubing/IA lost 51/51 psi 1st 15 min and 22/22 psi 2nd 15 min for a total loss of 73/73 psi over 30 min test. Bleed psi's, approx 7 bbls. FWHP 1000/880/160 SLB on well at departure. 07/07/13 Full Bore w/SLB pumpers set Cmt plug. Arrive on location, RU SLB, PT lines,test SSV, perform no flow test on swab&SSV, good. Prep for cmt plug job. Set balanced plug with 69 bbls of 15.8 PPG"G"from 9212'to 8200'across IA&Tbg. Calc'd TOC 8200'. FP'd w/diesel. RD MOL. 07/16/13 T/I/O=VAC/0/250 Conduct PJSM.Barriers=MV, SV. Start barriers Iist.Performed Independent leak tight test on SV and MV prior to removal of tree cap(Passed). Rigged down tree cap assembly. Install ASV#5 and tree cap assembly.Torque flanges to API specs. Pressure tested 300 Psi. and 5000 Psi. independently for 5 min.(Passed) using SV as barrier.Charted and documented. RDMO. MV=O, SSV=S, SV=S,ASV=S,WV=S. 07/16/13 BRUSHED TREE W/2.81"SWAGE,4-1/2" BLB. TAGGED TOC W/1.5"S. BAILER,2.50"CENT @ 7910'sl.m-(sample of wet cement). DRIFTED W/3.70"CENT(E-LINE JET DRIFT)TO 4250'SLM (no issues). DRIFTED TREE W/4.0 BPV DRIFT(no issues). 07/18/13 T/I/O=26/-11/251.Temp=SI CMIT-TxIA to 3000 psi (Rig prep) CMIT T x IA to 3000 psi. PASSED.T/IA lost 13/17 psi in first 15 minutes&7/10 psi in second 15 minutes.Total loss=20/27 psi. Bleed T/IA pressures down to 0 psi. FWHP=0/0/260. Swab, SSV, &wing closed. Master, IA, &OA open. 07/20/13 INITIAL T/I/O= 10/200/250 PSI. RIH W/3.65"CUTTER, CUT TUBING AT 4131' ELMD, GOOD INDICATION OF FIRING. PUMPED ON TUBING AND IA PRESSURE TRACKED. FINAL T/I/O= 150/200/200 PSI. Page 3 of 4 Y-13A, Well History (Pre Rig Sidetrack) Date Summary 07/21/13 T/I/0= 124/75/250 Temp=S/I CMIT-TxIA to 2500 PSI **PASSED**(Rig Prep) Pumped 5.5 bbls AMB diesel to test. 1st 15 min TxIA lost 79/85&2nd 15 min TxIA lost 36/35 psi for a total TxIA loss of 115/120 psi in 30 min. Bled back—5 bbls. FWHP's=100/60/250 Upon departure DSO notified of SSV's,SWV=S/l IAV,OAV=OTG. 07/22/13 T/I/0=SSV/120/250.Temp=SI. Bleed WHPs to 0 psi (Pre rig). No AL,flowline, or wellhouse. IA&OA FLs near surface. Bled OA from 250 psi to 120 psi (gas&-1 bbl fluid) in 45 mins. Monitored for 15 mins. OAP increased 17 psi. Job discontinued for shift change. Final WHPs=SSV/120/137. Note: Ops IA gauge shows 400 psi. SV, WV&SSV=C. MV=O. IA&OA=OTG. NOVP. 1615 hrs. 07/22/13 T/I/O = 150/220/240 Conduct PJSM. Barriers=SV&MV, Verify barriers by perfomring independent LTT(PASSED). Remove ASV#5, Installed Tree Cap Flange on top of SV.Torqued Flange to API Spec. PT'd Tree Cap Flange through Tree Cap,Againsed Closed SV(Passed). Rigged Down. 07/23/13 T/I/O= 150/116/159.Temp=SI. Bleed WHPs to 0 psi (Pre rig). No AL,flowline, or wellhouse.TBG&IA FL @ surface. OA FL's near surface. Bled TP from 150 psi to 5 psi in 1 hr(-3 bbls returned). Bled IAP from 116 psi to 0 psi in 20 min (-1 bbls returned). Bled OAP from 159 psi to 0 psi in 4 hrs(—.5 bbls returned). Monitor 30 min.TP unchanged, IAP unchanged, OAP increased 4 psi. Final WHPs=5NAC/4. SV,WV, SSV=C. MV=0. IA, OA=OTG. NOVP. 1630. 08/06/13 T/I/0=0/10/0 Conduct PJSM. Barriers= IA/OA valve. Verrified by bleeding IA and OA pressure off of gate. LTT Pass remove bind flange and Piggy back temp valve#23 to the OA with Intgeral tapped blind flange. Piggy backTemp valve# 14 to the IA with Intgeral tapped blind flange.Torqued all flangest to API specs and PT'd throught the intergal flanges to 300/3500 PSI for 5 min each. Pass charted and documented. Barriers=MV and SV. Bleed tubing pressure off MV and SV Independently. LTT pass. RU CIW lubricator with 4" H type BPV#149 PT'd lubricator aginst SV gate to 300/3500 PSI for 5 min each pass. Pressured up tubing to 250 PSI. RIH and set BPV# 149 tagging at 125". Barriers= BPV and MV. Bleed tubing pressure off BPV and MV independently LTT Pass. Remove scaffolding and upper tree. Install 4"temp HWO valve#15 Torque flanges to API Specs. PT'd Temp vavle against MV Gate to 300/5000 PSI for 5 min each pass charted and documented. RDMO. 08/11/13 T/I/0=MV/137/30.Temp=SI. Bleed IAP&OAP to 0 psi (Rig prep). No AL,flowline,wellhouse or scaffolding. Secondary casing valves on IA&OA. IA FL @ surface, OA FL near surface. Bled IAP from 137 psi to 0+psi in 5 min (—.25 bbl returned). Bled OAP from 30 psi to 0+psi in 1 hr 15 min (All gas). Monitored for 30 min. IAP unchanged, OAP increased 4 psi.Job in progress. Final WHPs= MV/0+/4. SV, MV=C. IA, OA=OTG. NOVP. 0400. 08/12/13 T/I/0= MV/0+/4. WHPs(Pre-Rig) Dry Hole tree. No scaffolding or flowline. Has wellhouse.WHPs= MV/0+/4. 1645. Page 4 of 4 North America-ALASKA-BP Page 1 oar- Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/29/1981 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Y-13 @85.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/12/2013 00:00 - 12:00 12.00 RIGD X WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS -PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13. -RIG WAS RELEASED FROM J-29 @ 24:00 HRS 08-11-2013 -SIMOPS '-PERFORM SERVICE AND MAINTENANCE ON TDS 12:00 - 00:00 12.00 RIGD X WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13. -SIMOPS -PERFORM SERVICE AND MAINTENANCE ON TDS -REMOVE AND CLEAN U-TUBE ON POORBOY DEGASSER 8/13/2013 00:00 - 12:00 12.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS -PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13. -SIMOPS -PERFORM SERVICE AND MAINTENANCE ON TDS -GENERAL RIG MAINTENANCE AND HOUSEKEEPING -MPI YOKE AND TDS COMPONENTS -MPI HIGH PSI MUD LINES 12:00 - 00:00 12.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS - PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -WORK ON PUMP ROOM TROLLEY BEAMS -PREP CATTLE CHUTE -PREP DERRICK AND SCOPE DOWN 8/14/2013 00:00 - 12:00 12.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS - PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -BRIDLE DOWN,PIN TDS,LOWER CATTLE CHUTE --DISCONNECT POWER,PIT AND PUMP COMPLEXES AND WALK AWAY FROM SUB TO ALLOW CRANE ACCESS 12:00 - 15:00 3.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS - PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -PREP DERRICK HOISTING CYLINDER FOR REMOVAL -PJSM,REMOVE AND REPLACE DERRICK HOISTING CYLINDER 15:00 - 18:00 3.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS - PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -PJSM,PREP,SKID FLOOR AND RAISE C-SECTION Printed 8/30/2013 1:26:53PM North America-ALASKA-BP Page 241916-- Operation ,p1916"Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/29/1981 12:00:00AM !Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Y-13®85.54usft(above Mean Sea Level) Date i From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) _ 18:00 - 20:00 2.00 T RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS - PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -INSPECT DERRICK -PJSM,LAY OVER DERRICK AND SECURE FOR MOVE 20:00 - 00:00 4.00 RIGD N WAIT j PRE WAIT ON COMPLETION OF PIPELINE REPAIRS - PERFORM MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A 1-MOVE COMPLEXES TO ACCESS MATTING BOARDS. 8/15/2013 00:00 - 12:00 12.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS PERFORM GENERAL RIG MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -STAGE COMPLEXES FOR RIG MOVE -WALK OUT SUB AND STAGE FOR LOAD OUT. -PICK UP MATTING BOARDS AND READY FOR TRANSPORT 12:00 - 00:00 12.00 RIGD N WAIT PRE WAIT ON COMPLETION OF PIPELINE REPAIRS PERFORM GENERAL RIG MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -COMPLEXES ARE STAGED FOR RIG MOVE 8/16/2013 00:00 - 08:00 8.00 RIGD N WAIT PRE i WAIT ON COMPLETION OF PIPELINE REPAIRS AND CLEARANCE FRON GC-2 - PERFORM GENERAL RIG MAINTENANCE AND PREP RIG FOR MOVE TO Y-13A -COMPLEXES ARE STAGED FOR RIG MOVE 08:00 - 12:00 4.00 MOB • P PRE BEGIN MOBILISE RIG FROM J-29 TO Y-13A -MOVE PUMP AND MOTOR COMPLEXES TO Y-PAD AND STAGE -PUMP AND POWER COMLEXES DEPARTED J-29 @ 10:00 HRS. -GAVE 24 HR.NOTIFICATION TO AOGCC OF IMPENDING INITIAL BOPE TESTING ON WELL AT 10:44-HRS.VIA HTTP://DOA.ALASKA.GOV/OGC/FORMS/TEST WITNESSNOTIF.HTML -TEST WITNESS WAIVED BY AOGCC INSPECTOR-JEFF TURKINGTON 12:00 - 00:00 12.00 MOB P PRE MOBILISE PIPE SHED,PIT,SUB,AND CSG SHED COMPLEXES TO Y-PAD AND SPOT. -FINAL TWO RIG COMPLEXES ARRIVE Y-13A '@17:OOHRS 8/17/2013 00:00 - 12:00 12.00 MOB P PRE RIG UP ON Y-13A -POSITION PIPE SHED -PJSM,RAISE DERRICK AND SKID FLOOR -WALK PUMP AND POWER COMPLEXES INTO POSITION -WORK ON INTERCONNECTS BETWEEN COMPLEXES. 12:00 - 16:30 4.50 MOB P PRE -WORK ON PREACCEPTANCE CHECKLIST -INSPECT HAND RAILS,WALKWAYS,AND LANDINGS. -WORK ON INTERCONNECTS. -PREP DERRICK TO SCOPE. Printed 8/30/2013 1:26:53PM 0 North America-ALASKA-BP Page 3-9Q8' Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad I Rig Name/No.:DOYON 25 Spud Date/Time:7/29/1981 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. d UWI: Active datum:Y-13©85.54usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 16:30 - 22:00 5.50 MOB P C PRE PJSM,SCOPE DERRICK -RIG DOWN BRIDLE LINE AND BRIDLE LINKS -SPOT CASING SHED AND LEVEL -CALIBRATE AND TEST TOTCO SENSOR EQUIPMENT,OK • 1-RIG ACCEPTED @ 22:00 HRS 08-17-2013 22:00 - 23:00 1.00 RIGU P PRE 'RIG UP ANNULUS VALVES,HIGH PRESSURE I CIRC LINES FOR DISPLACING FREEZE PROTECT, PORTABLE CHOKE&HARD LINE. 23:00 - 00:00 1.00RIGU P PRE PRE-SPUD MEETING WITH BOTH CREWS, '-HELD RIG EVACUATION DRILL WITH BOTH CREWS,FULL MUSTER AND HEAD COUNT. -HELD MR 8/18/2013 00:00 - 05:00 5.00 KILLW P DECOMP PJSM 1MTH DSM LUBRICATOR CREWAND RIG CREW. -RIG UP LUBRICATOR AND TEST I -250 PSI LOW FOR 5 MIN/3500 PSI HIGH FOR I I 5 MIN,GOOD PULL BPV,R/D LUBRICATOR 05:00 - 07:00 2.00 KILLW P DECOMP RIG UP CIRCULATING LINES AND PRESSURE TEST 200 PSI LOW/2000 HIGH -REVERSE CIRCULATE TAKING RETURNS TO TIGER TANK @ 7 BPM -PUMP 460 BBL SEAWATER,RECOVERED 142 BBL FREEZE PROTECT DIESEL -RECYCLED DIESEL @ FS#1 07:00 - 12:00 5.00 KILLW P DECOMP MONITOR WELL -RIG DOWN CIRCULATION LINES -INSTALL AND TEST DSM LUBRICATOR 250 PSI LOW 5 MIN/3500 PSI HIGH 5 MIN -INSTALL TWC,TEST SAME ABOVE 250 PSI LOW 5 MIN,3500 PSI HIGH 5 MIN -TEST BELOW TWC,250 PSI LOW 5 MIN/ 2000 PSI HIGH 5 MIN -RIG DOWN LUBRICATOR,CIRCULATION LINES AND TEST EQUIPMENT -SUCK OUT DRY HOLE TREE 12:00 - 15:00 3.00 WHSUR P DECOMP 'RIG UP DRY HOLE TREE TO BLOCK AND STAGE UP WT -TREE BROKE FREE @ 24K OVER PULL -CLEAN VOID AROUND HANGER,INSPECT II I CONTROL LINES WORK AND RECORD LOCK DOWN SCREW I LENGTH,3 1/8"IN/3 3/4"OUT 15:00 - 21:30 6.50 BOPSUR P DECOMP NIPPLE UP RISERS AND BOPE 21:30 00:00 2.50 BOPSUR P DECOMP RIG UP TEST EQUIPMENT AND 4 1/2"AND 5" TEST JOINT '-PJSM BEGIN TEST BOPE -ALL TESTS CHARTED 250 PSI LOW 5 MIN/ 3500 PSI HIGH 5 MIN WITH EXCEPTION OF MANUAL AND SUPER •CHOKE TESTED TO 250 PSI LOW 5 MIN/2000 PSI HIGH 5 MIN -AOGCC WITNESS WAIVED BY REP JEFF TURKINGTON 8/19/2013 00:00 - 04:00 4.00 BOPSUR P DECOMP CONTINUE TESTING BOPE. LOWER IBOP LEAKING. Printed 8/30/2013 1:26 53PM North America-ALASKA-BP Page 442154.6-" Operation p$a&- Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: I X3-012X7-C:DRILL(10,868,000.00) I Project:Prudhoe Bay !, Site:PB Y Pad --__- Rig Name/No.:DOYON 25 I Spud Date/Time:7/29/1981 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Y-13(g85.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 06:30 2.50 BOPSUR N SFAL DECOMP CODE 8: CHANGE OUT LOWER IBOP DUE TO LEAK _ I DURING BOP TEST 06:30 - 08:00 . 1.50 BOPSUR P I DECOMP TEST LOWER IBOP,250 PSI LOW 5 MIN/ 3500 PSI HIGH 5 MIN,OK 0 3.00 RIG DOWN TEST EQUIPMENT. 8:00 - 11:00 PULL P DECOMP RIG UP DUTCH RISER AND LUBRICATOR, CLOSE ANNULAR ON DUTCH RISER AND TEST SAME TO 250 PSI LOW 5 MIN/3500 PSI .HIGH 5 MIN. 11:00 - 12:00 1.00 PULL P I DECOMP DRAIN STACK,RIG UP SCHLUMBERGER LINE SPOOLER 12:00 - 14:00 2.00 PULL P DECOMP MAKEUP BAKER SPEAR/GRAPPLE -RIH AND LATCH ONTO TUBING HANGER, STAGE WEIGHT UP, -HANGER FREE @ 176K -MONITOR WELL 10 MIN STATIC. 14:00 - 15:30 1.50 PULL P DECOMP CLOSE ANNULAR AND CIRC THROUGH 'CHOKE STAGE PUMPS TO 4.5 BPM/700 PSI ' AND CIRC 60 BBL DEEP CLEAN COMPLETE CIRCULATION. -OPEN ANNULAR, 15:30 - 16:00 0.50 PULL P DECOMP !DRAIN STACK,PULL HANGER TO FLOOR '-DISENGAGE GRAPPLE AND LAY DOWN BAKER TOOLS. 16:00 - 17:00 1.00 PULL P DECOMP PJSM,RIG UP POWER TONGS, I ' SCHLUMBERGER SPOOLING UNIT AND HANDLING TOOLS. 17:00 - 22:00 5.00 PULL P DECOMP PULL 50 JTS 4 1/2"TUBING TO TOP OF SSSV. -CONTROL LINE SHEATHING BADLY DETERIORATED AND BREAKING OFF BEFORE REACHING SPOOLING UNIT. -TERMINATE CONTROL LINE AT SSSV -RIG DOWN AND LAY DOWN SPOOLING UNIT AND CHECK FOR N.O.R.M. -RECOVERED 26 OF 26 RUBBER CLAMPS AND 0 OF 2 STAINLESS STEEL CLAMPS 22:00 - 00:00 2.00 PULL P DECOMP CONT POOH WITH CUT OFF 4 1/2"TUBING. -LAY DOWN 1 EA GLM BETWEEN JT#73/#74 -TOTAL JTS LAID DOWN=103+ CUT-OFF(2.90') i -NO OTHER CLAMPS,BANDS,OR HARDWARE RECOVERED. 8/20/2013 00:00 - 01:00 1.00 CLEAN P DECOMP CLEAR RIG FLOOR, 01:00 - 01:30 0.50 CLEAN P DECOMP RIG SERVICE,LUBRICATE TDS AND BLOCKS 01:30 - 03:30 2.00 CLEAN P DECOMP TRANSFER TUBING OUT OF PIPE SHED AND LOAD CLEAN OUT BHA 03:30 - 04:00 0.50 CLEAN ' P ' 1 ' DECOMP !SET WEAR BUSHING AND RILDS. 04:00 - 07:30 3.50 ! CLEAN P DECOMP PU/MU UP CLEAN OUT BHA TO 880'MD PER BAKER REP DIRECTION -MONITOR DISP VIA THE TRIP TANK 07:30 - 10:30 3.00 CLEAN P DECOMP i RIH WITH 9-5/8"CLEAN OUT BHA ON 5"DP DOUBLES FROM PIPE SHED F/880'MD TO 3,848' -MONITOR DISP VIA THE TRIP TANK Printed 8/30/2013 1.26:53PM North America-ALASKA-BP Page 5.oP46' Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:8/12/2013 End Date: 'X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 25 Spud DateRme:7/29/1981 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI. Active datum:Y-13 @85.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:30 1.00 CLEAN P DECOMP WASH&REAM FROM 3,848'MD TO 4,101 MD -600 GPM,1140 PSI,50 RPM,1-2 K TQ -PUW-150K,SOW-158K, •-WASH DOWN WITH NO ROTATION FROM 4,101'MD TO 4,147'MD -TAG TOP OF 4-1/2"TUBING AT 4,147'MD 11:30 - 12:00 0.50 CLEAN P DECOMP I PUMP 40 BBL HIGH VIS SWEEP '-648 GPM,1345 PSI,20 RPM,3-4K TQ 12:00 - 14:00 2.00 CLEAN P DECOMP MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM-WELL STATIC -POOH WITH 9-5/8"CLEAN OUT BHA FROM '4,147'MD TO 880'MD -MONITOR DISPLACEMENT VIA THE TRIP TANK 14:00 - 16:00 2.00 CLEAN P DECOMP PJSM FOR LAYING DOWN BHA -LD BHA PER BAKER REP 16:00 - 16:30 0.50 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR -SEND OUT ALL CLEAN OUT TOOLS&LEAVE MILLS MADE UP AND SET IN PIPESHED 16:30 - 18:30 2.00 DHB P DECOMP SPOT SLB WIRELINE UNIT ON LOCATION -PU WIRELINE TOOLS TO RIG FLOOR. •PJSM WITH SLB AND RIG CREW FOR CORRECT RIG UP OF WIRELINE TOOLS •-PU/MU EZSV/GR/CCL 18:30 - 23:00 4.50 EVAL P DECOMP RIH WITH EZSV/GR/CCL ON WIRELINE -MAKE CORRELATION LOG PASS,CONFIRM WITH GEO FOR CORRECT SETTING DEPTH. -SET EZSV 5'ABOVE COLLAR AT 3,970', PLACING EZSV CENTER OF ELEMENT AT 3,965'MD(WLM)— 23:00 - 00:00 1.00 EVAL P DECOMP POOH WITH E-LINE AND EZSV RUNNING TOOL -LAY DOWN RUNNING TOOL 8/21/2013 00:00 - 01:30 1.50 STWHIP P DECOMP PRESSURE TEST EZSV&9-5/8"CASING TO 250 PSI LOW FOR 5 MIN/3500 PSI HIGH FOR 30 MIN EACH -TEST APPROVED BY BP WTL JIM WILLINGHAM 01:30 - 03:30 2.00 STWHIP P WEXIT PJSM FOR PU BHA,DDI,BAKER,BP MU WHIPSTOCK,ANCHOR&MILLING ASEMBLY BHAAS FOLLOWS: TRIP ANCHOR,WHIPSTOCK,STARTER MILL, (3)WATERMELLON MILLS,HWDP,FLOAT SUB, MWD,(9)6-1/2"DC'S,(5")HWDP,5"OP 03:30 - 04:30 1.00 STWHIP P WEXIT RIH WITH WHIPSTOCKASSEMBLY ON 5"DP DOUBLES FROM THE PIPESHED -SHALLOW HOLE TEST MWD AT 943' -445 GPM,550 PSI-GOOD TEST -MONITORING DISPLACEMENT VIA THE TRIP TANK 04:30 - 08:00 3.50 STWHIP P WEXIT RIH WITH WHIPSTOCK ASSEMBLY ON 5"DP DOUBLES FROM THE PIPESHED F/943'MD TO 3,216'MD -FILL PIPE AT 2500' -CONT RIH F/3,216'MD TO 3,973'MD ON 5" DP STANDS FROM THE DERRICK -MONITOR DISPLACEMENT VIA THE TRIP TANK Printed 8/30/2013 1:26:53PM North America-ALASKA-BP Page 6.o1218 Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/29/1981 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active datum:Y-13 @85.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 09:30 1.50 STWHIP P WEXIT KELLY UP AND ORIENT WHIPSTOCK TO 54 DEG LEFT -500 GPM,850 PSI, -PUW 153K,SOW 161K, -SLACK OFF TO 3,974'MD(DPM) AND TAG UP ON EZSV -SET DOWN 20K AND SET TRIP ANCHOR -PICKED UP TO 20K OVER STRING WEIGHT TO VERIFY TRIP ANCHOR SET -SET DOWN WITH 40K DO WN WEIGHT TO SHEAR OFF WHIPSTOCK SLIDE -GOOD SET POOH TO 3,658'MD 09:30 - 11:00 1.50 DHB P WEXIT PJSM FOR FOR PU AND SETTING THE RTTS STORM PACKER -RIH 196'AND SET RTTS PER HALLIBURTON REP DIRECTION -PRESSURE TEST TO 250 PSI LOW AND 2000 PSI HIGH FOR 5 CHARTED MIN -BOTH TESTS GOOD 11:00 - 12:00 1.00 BOPSUR P WEXIT PU 5"DP JOINT AND PULL WEAR BUSHING -SUCK OUT STACK,PREP FOR ND OF RISER AND BELL NIPPLE 12:00 - 15:30 3.50 BOPSUR P WEXIT PJSM FOR ND TUBING SPOOL -PU AND BREAK 13-5/8"GRAY SPOOL CONNECTION WITH BOPE CARRIER SEPERATE FROM BOPE RISER AND TAIL OUT WITH LOADER 15:30 - 16:00 0.50 WHSUR P DECOMP PREP WELL HEAD FOR NEW SPOOL -REPLACE SEALS, 16:00 - 17:00 1.00 WHSUR P DECOMP INSTALL NEW 9-5/8"TBG SPOOL/MANDREL HANGER NECK SEAL PER CAMERON PORCEDURE 17:00 - 18:00 1.00 WHSUR P DECOMP PRESSURE TEST MANDREL HANGER NECK SEALS AND TUBING SPOOL FLANGE-250 PSI LOW FOR 5 MIN,3,500 PSI HI FOR 30 MIN CHARTED 18:00 - 19:00 1.00 BOPSUR P WEXIT NU BOPE AND RISER,INSTALL BELL NIPPLE INFLATE AIR BOOTS AND INSTALL PS-21 19:00 - 20:00 1.00 BOPSUR P WEXIT SET TEST PLUG AND TEST BOPE BREAKS -250 PSI LOW 3500 PSI HIGH FOR 5 CHARTED MIN-GOOD TEST -LD TEST PLUG&TEST JOINT,INSTALL WEAR RING-9-1/8"ID 20:00 - 22:00 2.00 DHB P WEXIT RIH TO RETRIEVE 9-5/8"RTTS PACKER: -CLOSE FOSV,19 RIGHT HAND TURNS ON DP TO OPEN 9-5/8"RTTS STORM VALVE -CLOSE ANNULAR PREVENTER -OPEN FOSV AND CHECK FOR TRAPPED PRESSURE BELOW THE RTTS. 0-PSI -STRAIGHT PULL RELEASE 9-5/8"RTTS PACKER -CHECK IA FOR PRESSURE.0-PSI ON IA -OPEN ANNULAR PREVENTER -POH AND LAY DOWN 9-5/8"RTTS 22:00 - 23:30 1.50 CLEAN P WEXIT PJSM FOR DISPLACING WELL -DISPLACE WELL TO 9.0 PPG LSND PER MI MUD ENGINEER PROCEDURE -6 BPM,230 PSI Printed 8/30/2013 1:26:53PM North America-ALASKA-BP Page 7 pea+ Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/29/1981 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI: Active datum:Y-13 @85.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 CLEAN P WEXIT BLOW DOWN CHOKE AND KILL LINES -OBTAIN SPR'S W/9.0 PPG LSND MP#1-20/110,30/140 MP#2-20/110,30/140 8/22/2013 00:00 - 06:00 6.00 STWHIP P WEXIT MILL WINDOWAS PER BAKER REP F/3,953' TO 3,970.(TOW 3,953',BOW 3,970') / u al1.T -320-398 GPM,420-560 PSI,5-10K WOB v' -70-80 RPM, TQ 4-7K,MW-9.0 PPG Y— 134 PUW-150K,SOW-158K,ROT-156K TOW=3,953'MD,MOW=3,961'MD,BOW= 3,970'MD 250 LBS OF METAL SHAVINGS RECOVERED 06:00 - 08:30 2.50 STWHIP P WEXIT DRILL 20'OF NEW FORMATION F/3,970'MD TO 3,946 TVD -398 GPM,560 PSI,10K WOB,80 RPM,4K TQ, -MW9.0IN/9.0OUT WORK MILLS THROUGH THE WINDOW 3 TIMES-W/398 GPM,50 RPM,SAWA 2K- FT/LB INCREASE IN TQ WHEN GOING THROUGH THE WINDOW -ALSO SAWA SLIGHT 2K LB WEIGHT REDUCTION WHILE GOING IN THE HOLE. 08:30 - 10:00 1.50 STWHIP P WEXIT PUMPASUPER SWEEP PILL AND CIRCULATE HOLE CLEAN -500 GPM,910 PSI,20 RPM,1-2K TQ, -TOTAL PUMPED: 1-1/2 BOTTOMS UP -MINIMAL CUTTINGS RETURNED FROM SWEEP 10:00 - 11:30 1.50 STWHIP P WEXIT POOH TO 3,920'MD.R/U TEST EQUIPMENT AND PERFORM LOT. -TVD=3,946'MD -13.85 PPG EMW LOT ACHIEVED(994 PSI SURFACE PRESSURE) -FIT APPROVED BY ODE -R/D TEST EQUIPMENT MONITOR WELL FOR 10 MIN-STATIC MW 9.0 PPG IN AND OUT 11:30 - 14:00 2.50 STWHIP P WEXIT POOH FROM 3,920'MD TO 921'MD MONITOR WELL FOR 10 MIN-STATIC -MONITORING DISPLACEMENT VIA THE TRIP TANK-HOLE TAKING CORRECT FILL 14:00 - 17:00 3.00 STWHIP P WEXIT POOH&L/D 8 1/2"WINDOW MILLING ASSEMBLY FROM 921' -STAND BACK HWDP,PU JARS AND RACK BACK -L/D 6-1/2"SPIRAL DRILL COLLARS&REST OF MILLING ASSEMBLY -STARTER MILL 1/4"OUT OF GAUGE -LOWER WATERMELON MILL IN GAUGE -BOTH UPPER STRING MILLS IN GAUGE 17:00 - 19:00 2.00 STWHIP P WEXIT CLEAN AND CLEAR RIG FLOOR. -P/U STACK WASHER AND WASH STACK -FUNCTION ALL THE RAMS&PULL WEAR RING AND WASH STACK AGAIN. 19:00 - 20:00 1.00 STWHIP P WEXIT BLOW DOWN CHOKE AND KILL LINES AND INSTALL WEAR RING W/9-1/8"ID 20:00 - 20:30 0.50 STWHIP P WEXIT INSPECT AND GREASE PIPE SKATE. Printed 8/30/2013 1:26:53PM North America-ALASKA-BP Page 8 §, Operation Summary Report Common Well Name:Y-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/12/2013 End Date: X3-012X7-C:DRILL(10,868,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 25 Spud Date/Time:7/29/1981 12:00:OOAM Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active datum:Y-13 @85.54usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 STMILL P WEXIT PJSM FOR MU BHA#2. M/U 8-1/2"INTERMEDIATE DRILLING BHA#1 AND SINGLE IN THE HOLE WITH 5"DP TO 1,100'MD -SHALLOW TEST MWD,450 GPM,800 PSI (GOOD TEST) 8/23/2013 00:00 - 03:00 3.00 STWHIP P WEXIT RIH WITH 5'DP STANDS FROM 1,100'TO 3,990'MD,MONITOR DISPLACEMENT ON TRIP TANK 03:00 - 09:00 6.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE FROM 3,990'MD TO 4,524'MD 4,409'TVD -600 GPM,1785 PSI ON/1560 PSI OFF,40-80 RPM,5K TQ --P/U=154K,S/O=150K,ROT=152K -5-15K WOB -SURVEY EVERY—100' - AST=1.72 HRS,ART=1.65,ADT=3.37 HRS -MW 9.2 IN/9.2 OUT SPR'S AT 4,524'MD(4,409'TVD),TIME 08:55, MW 9.2 PPG #1 MP-20/30 SPM=200/260 PSI #2 MP-20/30 SPM=200/260 PSI 09:00 - 09:30 0.50 DRILL P INTI CBU X 2 WHILE ROTATING AND RECIPROCATING. -602 GPM,1530 PSI -100 RPM,13-15K TQ MONITOR WELL FOR 10 MIN-STATIC 09:30 - 14:00 4.50 DRILL P INTI POOH ON ELEVATORS F/4,524'MD TO 738' MD -MONITOR WELL 10 MIN- WELL STATIC -POOH F/738',LD BHA#2 PER SLB DD DIRECTION -BIT GRADE: 1-1-WT-A-E-I-NO-BHA 14:00 - 14:30 0.50 DRILL P INTI CLEAN AND CLEAR RIG FLOOR 14:30 - 16:00 1.50 DRILL P INTI PJSM FOR BOPE TESTING OPERATIONS -RU TEST EQUIPMENT,MU FLOOR VALVES, BREAK SHEAR JOINT,PULL WEAR BUSHING. -SET TEST PLUG. 16:00 - 21:00 5.00 DRILL P INTI TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 4"&5"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WITNESS WAIVED BY AOGCC REP BOB NOBLE 21:00 - 22:00 1.00 DRILL P INTI RD TEST EQUIPMENT -DRAIN STACK,PULL TEST PLUG -SET WEAR RING-9-1/8"ID 22:00 - 23:00 1.00 DRILL P INTI PJSM FOR PICKING UP BHA#3 -PU&RIH W/BHA TO 178' C/O SLIP INSERTS TO 5" 23:00 - 00:00 1.00 DRILL P INTI RIH WITH RSS BHA#3 -RIH WITH BHA ON 41 SINGLE 5"DP FROM THE SHED TO—1,118' -SHALLOW HOLE TEST-GOOD TEST 8/24/2013 00:00 - 03:00 3.00 DRILL P INTI CONT RIH WITH RSS 8-1/2"BHA#3 F/1,118' MD TO 3,925'MD Printed 8/30/2013 1:26:53PM R TREE= 4"CNV WELLHEAD= GRAY Y-13 -13 SAFETY NOTES: ***TIGHT SPOT @ SEAL ASSY @ ACTUATOR= AXELSON 9773'. CAM CO SLIDING SLV HAS A MIN ID OF 3.75" IMTIAL KB.ELE 85.54' RENDERING THE X&XN NIPPLES USELESS. ID OF SS BF.E LEV= 51.04' MAY BE DAMAGED. KOP= 3200' Max Angle= 48°@ 6500' Datum MD= 10436' Datum TVD= 8800'SS 2608' —19-5/8"DV PKR 13-3/8"CSG,72#,L-80,D=12.347" — 2680' ril 9-5/8"WHIPSTOCK(08/21/13) —I 3953' 3974' H9-5/8"EZSV(08/20/13) JET CUT TBG(07/20/13) — 4131' H- IST MD IVI? DEV TYPE VLV LATCH PORT DATE Minimum ID =3.725" @ 9897' 7 3002 3002 5 CAM DMY RK 0 06/02/13 4-1/2" OTIS XN NIPPLE 6 5168 4881 39 CAM DMY RK 0 06/02/13 5 6893 6098 47 CAM DMY RK 0 06/02/13 TOC — —8200' 4 7602 6609 42 CAM DMY RK 0 11/29/94 rr 3 8230 7088 38 CAM DMY RK 0 06/02/13 ► BOC—I —9212' u �. 2 8743 7500 35 CAM DMY RK 0 01/02/92 4�4'� 1 9212 7884 36 CAM *EMPTY RK 0 07/04/13 *STA 1 =LEFT POCKET E NF TY FOR CEMENT PLUG 9713' --I CA MCO SLIDING SLAVE,ID=3.75" J 7 ' SEAL SLEEVE TOC -9802' � � H 9-5/8"x 4-1/2"BKR PICK D=4.00" TOP OF 7"LNR H 9853' — -it 4 9854' �4-1/2"OTIS X NP,D=3.813" 11 1 9897' 1_44-1/2"OTIS XN NP,D=3.725" • 111. 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" 9937' 9939' _14-1/2"SI-EAROUT SUB 9947' H ELMD TT LOGGED 03/21/99 ♦ N •� -8743'OR DEEPER FISH:2 WRP 11E '1 TS LEFT 9-5/8^CSG,47#,L-80,D=8.681" H 10357' # �► ► # DH(06/04/13) 4~4~4~4~4~" 44#4.4 4#444*4i PERFORATION SUMMARY * REF LOG:BHCS ON 08/16/81 10509' —1 MARKER JOINT ANGLE AT TOP PERF:35°@ 10385' `� 44 ♦44*44 • Note:Refer to Production DB for historical perf data * 4 viii SQE SPF NTEVAL OpNSgz SHOT SOZ3-3/8" 4 10385-10413 S 08/27/93 06/27/132-5/8" 12 10502-10522 S 02/24/91 06/27/13 2-5/8" 10 10522-10552 S 02/24/91 06/27/132-7/8" 4 10552-10554 S 01/21/912-7/8" 4 10558-10566 S 01/21/912-7/8" 4 10576 10616 S 01/21/914 3-3/8" 6 10623-10638 S 01/21/91 44#444* PBTDH 11240' . hitt##.! 7"LNR,29#,L-80,.0371 bpf, D=6.184" -H 11290' ����������������, DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/20/81 BIXBY ORIGINAL COMPLETION 07/16/13 MBI-4/JMD GLV C/O(07/04/13) WELL: Y-13 12/19/02 JB/KAK CAMCO SLIDING SLV NOTE 07/16/13 ' JLS/JMD CMT PLUG SET(07/07/13) PERMIT No:'1811120 01/01/10 BSE/RPC WRP,GLV UPDATE(12/30/09) 08/13/13 ATO/JMD JET CUT TBG(07/20/13) AR No: 50-029-20634-00 06/06/13 BSFJJMD GLV C/O(06/02/13) SEC 33,T11 N,R13E, 1479'FNL&528'FEL 06/10/13 LEC/JMD PULLED WRP/LEFT FISH(06/04/13) 07/16/13 REM/JMD FB P&A STAGE 1 (06/27/13) BP Exploration(Alaska) • • g w\��� j /j s THE STATE Alaska Oil and Gas °fA LASKA Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue OF e- Anchorage, Alaska 99501 -3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 John Egbejimba () Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Y -13 SC AN(VE� JAN Sundry Number: 312 -330 9 2013 Dear Mr. Egbejimba: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, t?";2e-14,_ Cathy Foerster Chair DATED this 2 day of October, 2012. Encl. 90 10" e\17 . STATE OF ALASKA ALL OIL AND GAS CONSERVATION COSSION Fl > to - - ® � z._ APPLICATION FOR SUNDRY APPROVAL AUG 2 4 2012 20 AAC 25.280 1. Type of Request: .OGCC ❑ Abandon ® Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved rrogram ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. 0 Development ❑ Exploratory 181 - 112 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50 029 - 20634 - 00 - 00 ' 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: pBU Y -13 Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 028287 ' Prudhoe Bay / Prudhoe Bay • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11290' - 9645' • 11240' 9598' 9830' None Casing Length - Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2680' 13 -3/8" 2680' 2680' 4930 2670 Intermediate 10357' 9 -5/8" _ 10357' 8811' 6870 4760 Production Liner 1437' 7" 9853' - 11290' 8405' - 9645' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10385 - 10552' 8834' - 8975' 4-1/2", 12.6# L -80 9939' Packers and SSSV Type: 9 -5/8" x 4 -1/2" Baker Packer Packers and SSSV 9779' / 8345' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ® BOP Sketch 1 ❑ Detailed Operations Program ❑ Exploratory _"4 Development ❑ Service ❑ Str 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: October 1, 2012 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG ►_� Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Rahul Madarapu, 564 -4147 Printed Name, Egbejimba Title Engineering Team Leader /6 3/ 2_ Joe L astuf k a x 564 -4091 Signature R - Phone 564 Date 3 Commission Use Only Con itions of approval: Notify Com ssion % that a representative may witness Ei �/ Plug Integrity (b BOP Test ❑Mechanical Integrity Test 0 Location Clearance Sundry Number: b' .. - 44 35oo psi- 50P S t Other: ) /� N a 4-; rhr pe-c 1 * is ik e c aT�C Subsequent Form Required: /6 — 4 /0 7 A PPROVED BY Z Approved By: COMMISSIONER COMMISSION Date 70 Z - - / Form 10 -403 Revised 0 1/ 10 1 11 . ''I OCT q q � q ?'.!� 0___ D RI G t � S OC Q Sub it In Duplicate `S 2012 p ^ / • • To: Alaska Oil & Gas Conservation Commission b p From: Rahul Madarapu Drilling Engineer Date: August 8, 2012 Re: Y -13 Abandonment Sundry Request Well History: Sundry approval is requested for well Y -13. Y -13 is a Sag and Ivishak Zone 4 producer that was drilled in 1981. Y -13 was hydraulically fractured in the Ivishak in 1991 and refractured in 1992. Sag perforations were added in 1993. In 1999 a tubing leak was discovered and continued production on a waiver. The T x IA communication appears to be in the pup joint below GLM #1. A Bradenhead leak was found in the year 2002 and welded in the year 2003. This waiver to produce despite a tubing leak was cancelled in the year 2007. The condition of the tubing is poor and hence the well is shut in due to the T x IA communication. PPPOT -T passed on 5/1/2012 PPPOT -IC passed on 5/1/2012 MIT -OA to 2000 psi passed on 5/9/2012 CMIT- T x IA to 3000 psi passed on 5/10/2012 Reason for Sidetrack: The most recent tests indicated 100% water cut with no way to shut -off the water. Due to the fact that a RWO cannot be justified based on the situation, a rotary sidetrack has been found to be the best option to utilize the current wellbore. Y -13 is proposed to be sidetracked to access Sag River reserves by, . constructing a horizontal wellbore. Approximately 4100' of existing tubing will have to be cut and retrieved to allow a casing exit from the 9 5/8" casing. An 8 'h" intermediate hole is proposed to be drilled to the top of Sag River to be then isolated with a 7" 26# L-80 liner. A 6 1/8" hole will then be drilled from the bottom of the 7" liner by briefly drilling into the Ivishak and then continuing its trajectory into the Sag River by means of a 6 1/8" hole. The production section is to be completed with 4 1/2" liner system which has a combination of frac sleeves in the Sag river and solid section in the Ivishak that is to be cemented. Production is to " be limited to the Sag River. cif ^Wi. e0 kT On tern 141.940`;', Work: (scheduled to begin October 1, 2012) ti &k eel (eS / ** ,v 1. S Pull WRP. D &T to TD. 6t wC Over Q7 � v�,•r i4 i r yT r Kee r 3 f aeon ,i /� J Y 2. F In ectivit Test. to be f dean �` 3. F Fullbore P &A - 77 bbls of 15.8 class G cement. TOC at 8900'. 4. F MIT -T r --'p J e f: z„, : p t-atar -b id +b a,.s 7-4.> . P Y ZCbD 5. S D &T to TOC. Pull deepest GLV, drift for jet cut. x,3o _./ 6. F Circ out Well. 7. E Jet Cut TBG at 4100' MD. 8. V Set and test BPV. 9. W PBBOT -T, PPPOT -IC. Function all LDS. 10. E (gig support: Set EZSV plug at 3951r1C7Ili. 4 - w ` . • • Rig Work: (scheduled to begin on December 1, 2012) PEA 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Pull 4100' of 4 " TBG. ( ' � 3. Set whi.stock and mill 8 1/2" window at 3900' and 20' of o.en oh le with 9.0 • • . mud. 4. Drill intermediate section: 8 1/2" OH, 6900' (4 deg/100') with Gamma Ray /Resistivity /Caliper. 5. Run 7" 26# L -80 liner to 150' inside 9 5/8" casing. r( 6. Cement 7" liner to 1500' above shoe with 15.8 ppg Class G cement. N 7. Run CBL log to confirm isolation. 8. Drill 6 1/8" production hole with Gamma Ray /Resistivity /Azimuthal Density/Neutron /Azimuthal Caliper to 16850' MD. 9. Run 4 1/2" 12.6# 13 -Cr liner with swell packers, frac sleeves, and solid liner to 150' inside 7" liner. j_ (3 A 10. Cement only solid section of liner to top of 4 1/2" liner with 15.8 ppg Class G cement. 11. Run 4 1/2" 12.6# 13 -Cr completion from 4 1/2" liner top to surface. 12. Freeze protect well, RDMO Post -Rig Work: 1. Re- install wellhouse and FL's. 2. Generic GLV's Rahul Madarapu Drilling Engineer 907 564 4147 CC: Well File Sondra Stewman/Joseph Lastufka Attached: Existing Y -13 Proposed Pre -rig for Y -13A Proposed Y -13A . . • • Existing Y-13 Well TREE = 4' C/W SAFETY NOTES: ***TIGHT SPOT ri SEAL ASSY WELLHEAD GRAY Y-13 9773•. CAM CO SLIDING SLV HAS A MIN ID OF 3.75' ACTUATOR = AXB_SON RENDS:ONG THE X & XN MPPL ES USELESS. ID OF SS KB. Et_Ev = 85,54' MAY BE DAM AGED. BF ELEV = 51.04' I 204Z I-14-1/2" OTIS SSSV NP. D = 1813' I Max Angle . 48 @ 6500' 411/ Detum MD = 10436' Ciaii.in; TVD7 8800S§ 2608 13-3/8" CSG, 72#. L-80. ID = 12 6' .34r H 263 If 1 ' 9-5/8 DV PKR ' GAS LFT AM /NLRB_ S ST M3 WD DEV TYPE VLV LATCH FORT DATE .! 7 3002 2916 6 CAM DOSE RK 16 6 5168 4793 39 CAM DOME RK 16 Illim 5 6893 6010 46 CAM DONE RIK 16 4 7602 6524 42 CAM CM' RK 0 3 8230 7006 38 CAM DOME RK 16 M 2 8743 7421 34 CAM MY fRli 0 Minimum ID = 3.725" @ 9897' 1 9212 7806 35 CAM DWI FOC 0 02104/99 4-1/2" OTIS XN NIPPLE 1 1 1 9713' 1-1CAACO SLIDING SLEEVE D = 3.75" 1 1 i 9773• I_ITBG SEAL SLEEV E I O 9779' +-SS" x 4-112" BKR FR D = 4 00' Frill *I 9 831 111--1 v2 WFD SC WRP (121304'09, ITOP OF r LNP H 9854' 1_14-1,7 OTIS X NP ID = 3.813' 1 1 9897' 1_14-1,7 OTIS XN NV>. ID= 3.725" I 14-1/2" TBG, 12.6k, L-80..0152 bpf. ID =3.958" H 9937' 1--f 9939' . 1_14-1 /2" SHEAROur suB I 1 9947' H ELMD TT LOGGED 0121099 I • I 9-5/8" CSG, 47#. L-80. D = 8 681L1—I 10357' I l'et 0 1 PEFFORATION SAT/ARV 1 10509' FHA RKERJonrr 1 REF LOG! BHCS ON 08/16+81 ANGLE AT TOP PERP 35 @ 10385 1 Note: Refer to Production DB for historical pert data SIZE SPF INITERVAL OprL/Sqz DATE 3-3/8" 4 10385 - 10413 0 08/27/93 2-5/8" 12 10502 - 10522 0 02/24/91 2-5/8" 10 10522 - 10552 0 02324/91 2-7/8" 4 10552 - 10554 S 01/21191 2-7/8" 4 10558 - 10566 S 01/21/91 2-7/8' 4 10576 - 10616 5 01/21/91 3-3/8" 6 10623 - 10638 S 01/21"91 PBTD 11240' I 4W4'410'410' 1 7" LNR 29#, L-80, .0371 bpf, D .8.184* 11288' .0.3:34.3:41 • • Pre -rig Proposal wain- (WW1 EUREITEPTEW 4 "06•1 WWI • WALLAS Erg !f<CRIOOa2- Axa;saN Y -13 Prue -fig sus._ c*caa %LirwsAr�QCV asS ................. ............................... 0618E at s 1f11I�PLES U Ci D ov 19 Ice_aer - at5s+r 10=.E1E1t- 5ia►ir isaangs- again -; '.1*;/-',,- 4 IME "sr am mmilir ii76:1"--13113- Clika MO- mar 1 1 '. .. 41) !:: 1/01511211- mares I nor Hr -ss-rw I19- O11'LS$, TM. L-IgI -12.54r H 24 3c GAS LIFUSWORBLS Sr iD WO 1 r 'rase VIM °LAIOI 1 171111E Jet opt 1i# 4112/ I 7 940t sas i DOI a 14E' IOC 1i i Slit 013 95 OW IJOiE 60C 15 5 IWO 010 45 CAM OOVE Ail[ 1i TOG 8900` MD 4 11502 417!4 42 CAM Mir MC 0 8145' MD— 9 W95 91 c LSE MC 10 2 1111 T421 94 c2u5 Lair lac o -' 1 VIZ 7M 95 ChM OW FI( 0 mosso liniirmID =3.725 41 SIBT 4 NIPPLE X13 - Cllh '�ii>tIG - 915- .. pill 14 saa. maw x 7' � ' 01 - *tort 44R WARM 0 -4!O' J I NOW {412 11F 14 1 DSC1'(1 V3 V3501) I [...... !U ( _ 4 rre s xtotw -1919• I rase" _.144Jr 06S jai M'.0 -un- 1 ,. .,,,'' : A ' q 144.2r115. 1215.1. 1552 D -9lsr H li37 - < !03y' li 44R- stamouirsue -` I 5'Ii' H MINIM LOGGED031211101 11 ere trait 01 -sea- Hi 1035T y ,4 ', ,i. 8 +� , REF LOM inell 0110454151 ANELEAT1DP PEW 95.10E5' NEW ROM Poi dim DI Tr aiided netTii .. " ` FITE SFr IT/LL onarat LSE Y ,Ar 7; st 0- 4 10!4P -12419 0 0 2I1E9 r " ; 2- � 12 11-1 2 0 EOM . � b 24W 1i 1052 -10212 a 041211!1 244 4 105152 -12554 ai 011211!1 W ,' 24% 4 1 Min -10355 S 511211!1 1r W 2-.5i 4 1405 -155111 S 0U2125 9414 4 10@9 -11591 S 01121111 4 W ♦ }}}TTT I RIM H 4 " � � 1iliiiii` I1NN14 1i -a 21 L-O5 Jan D -i ar H 117!' �i'i' + ILIA . • • • Proposed RST TREE = 4'' OW 1NELLHEAD 4 GRAY Y-1 3A SAFETY NOTES: I ACTUATOR = AXELSON KB it = 85 547 Pr.O•OSedRST - 8F ELEV = 51.04 KOP 3200' , ,,,, 1,.• Allot Angle = 48 fa 6500' 4 2097' 4-1/2" SSSV NP LO= xx" . 0 Datum MD = 10436' i 41 III t.V Datum ND = 8600 11.11E " 1 SS -, , , ; 2660' HLUBR VALVE (2 control Imes) I '''''' ' ''' K - p; ft* - , 2608' 9-8/8" DV PKR 1134/8" WIG, 721, L-80, ID = 12. H 2636' I GAS LFT MANDRELS 4 1 3700' TOP OF 7" LINER ST MD TVD DEN TYPE VLV LATCH PORT DATE B 5 4 9-5/8" whipstock set at 3900± 4 **** ••••fI, 3 44444444v 44■1444•444. 2 •0144.444444. •••4444444444. 1 .44.4.4.444.01.4,11444 ' 4 •44•4***** ' y -1 ■•••••• 4 4,444 0,4 56@ 4838' I 9-5/8" CSG, 471, L-80, D =8 881" —1 10367 I SLB SAPriRE OP Gauge H ?? 1 ., 4 4,, 2- X NP ID z 3.813 I f II PP Minimum ID = 4 4. '' ■ ''' 10300' 7 X 4-1 z PKR NIL m 4-12 X NIP. 0=3813' I ,k. I 1 0' -, - fi:' 8-1/2" hole 541/2" TBG, 12 Mt, 13Cr-80 0152 bp, iD = 3 958" I 10600' 4, 4 2 TUBMG TA t. I *-- L__J - , L Jr I T O P OF 4-1/2" LNR H I !!!,:.,, , 17" LNR, 26#, L-80 H 10760' I ' '. ' 40° 105az -10.8ppg 7" © TSGR FORATION TSAD FER SUMIWkRY 4 1 5D LS REF LOG: , i A(CLE AT TOP PERF ',:t 1 — Port Conar o N3te„ Refer to Production Ce for hsboraI perf data ,.1. ,:,, 102 - 11800 HECP 1 BS G R S DA SE SPF INTERVAL OpniSqz DATE ,. immma. .4. Miimm■o mimmm , m ammimmm 6-1/8" hole ......• +chem kzibacelS mINIIIIMIll MMINNI• . . 4-1/2" 12 13Cr-80 - 16844 - 9e Y -13A ...,. . ' 4 -14V 4 li .*; 1 :‘, / 7, 1 , 4 4 / '1..I.' .:,,', ,, , „ , . 1 1 rm. 88881,1 „1/11-18 18,1 ON? 100/18 83188810 . . . ' „ 3811 1131.81.1818 .81 t ; 1 381 UV" 8.41.18 _ / , ,...,FAA-I ,OLL'VTLPOIV, .,•. '' '? , I • MIIIIIIIMM1.1-i1.I. 1.181 iv V 413.17111711 /1 1:11 - 1 7 , ' ... , d , 4144. 1 I 7.4; 44.4 . i 1.84 ' 1 4.d.44] QM) 4..11M CE1.4.- 1 1 ' .`/,114',/ ...11111 , . --.—.......----- ,,,,,,,.,,,. ,....,,A,„, y.,,,..,..p.,*.y..,, ..,■■ : ', IP IP IIP IP ! ' E =--- ....z. 1 1 4 . -TINA NI _ ULJUL) 1 _. \ ....e, . 7.„...k, 111.11111111011111=1. •' 4 ......., .. •=2 •,, __...„waiisici ,,,,, ____ • • 0 , Mil :I .1111.1111S All.11.1.1 IL (.7. \II2 -Al = I = = I iI --litIA Adld I: — • ... Oa ... --- . . - ' el 0 I ■ 7.1 WO T 1,1, 4 114.1 L I ; 48, „ . : . ■ k.J4,!, (r ,,,,,,,, ■ 1 1 . / ' . , ‘1 1.1 . 1. i?, t , , , , , . , "•,i , „ . . old - ON/ 7 ilia Alaioa Page 1 of 1 Subject: FW: INTENT PLUG for RE -DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10 :52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE -DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE -DRILL WELLS (IPBRD) Type Work Code in RBDMS 1. When a Form 10 -403 is submitted requesting approval to plug a well for redrill, the initial reviewer (Art or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 form is checked. If the "Abandon" box is checked, we will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). 2. On the Form 10 -403 if "Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve D. will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and ✓ operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10 -403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10 -407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re -drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10 -407. Steve will also change the status on the 10 -407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10 -407 into RBDMS. 5. When the Form 10 -407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. file: //F: \Daily_Document Record \Procedures_Instructions \FW INTENT PLUG for RE - DRI... 4/6/2012 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 _. December 20, 2010 4 Zgt • Mr. Tom Maunder Alaska Oil and Gas Conservation Commission SjOA � e� ,,, ?„r�fi1S•� %'� 333 West 7 th Avenue Anchorage, Alaska 99501 {t " Subject: Corrosion Inhibitor Treatments of GPB Y Pad 1 � � I I ✓ 1� Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12/20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y -01B 2010760 50029203940200 NA 2.5 NA 8.50 4/11/2010 Y -02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y - 03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010 Y - 04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 Y -05B 2081380 50029204360200 NA 3.3 _ NA 20.40 4/15/2010 Y -06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010 Y -08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 Y -09A 1970830 50029205790100 19 1.5 3.6 NA 17.00 8/4/2010 Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010 Y -11 C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010 Y -13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 Y -14B 2011010 50029218320200 NA 3.8 NA 20.40 4/10/2010 Y - 15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y - 16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y - 18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010 Y -19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y -20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y - 21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y - 22A 1881150 50029215580100 NA 0.5 _ NA 3.40 8/4/2010 Y - 23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y - 24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010 Y - 25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y - 26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y - 27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 Y - 28 1910650 50029221690000 NA 3.5 _ NA 28.90 4/12/2010 Y - 29A 1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010 Y - 30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010 Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010 Y - 32 1910410 50029221490000 NA 0.3 NA 1.70 4/18/2010 Y - 33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y -34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010 Y - 35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y - 36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y - 37A 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 & STATE OF ALASKA . Al Oil AND GAS CONSERVATION COM "SION REPORT OF SUNDRY WELL OPERATIONS Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure o 0 0 000 15. Well Class after proposed work: Exploratory Development p,¡ 16. Well Status after proposed work: Oil G3 Gas WAG 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development G3 ' Stratigraphic 0 85.5 KB 8. Property Designation: ADL-028287 . 11. Present Well Condition Summary: Total Depth measured 11290 feet true vertical 9653.07 . feet Effective Depth measured 11240 feet true vertical 9606.31 feet Casing Length Size MD Conductor 80 20"x30" 30 - 110 Surface 2607 13-3/8" 72# L-80 29 - 2636 Production 10329 9-5/8" 47# L-80 28 - 10357 Liner 1435 7" 29# L-80 9853 - 11288 Perforation depth: Measured depth: 10385 - 10413 True Vertical depth: 8842.62 - 8865.65 10502 - 10552 8940.49 - 8983.44 Tubing: (size, grade, and measured depth) 4-1/2" 12.6# Packers and SSSV (type and measured depth) 4-1/2" Baker Packer 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl o o x Contact Sharmaine Vestal Stimulate 0 Other 0 WaiverD Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 181-1120 6. API Number: 50-029-20634-00-00 9. Well Name and Number: 0- o o Exploratory Service Y-13 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool . Plugs (measured) 9820 Junk (measured) None TVD 30 - 110 29 - 2635.92 28 - 8819.82 8413.35 - 9651.2 Burst Collapse 5380 6870 8160 2670 4760 7020 j'~~~~~ì!f:t "'!': ç' ¿\;J - - L-80' 30 - 9937 9779 RBDMS 8Fl MAY 2 4 2006 Tubing pressure o o Service [] WDSPl Title Data Mgmt Engr Signat Phone 564-4424 Date 5/22/2006 Submit Original Only ~ j;'.1..ý-c, e e Y-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDA TE I Sl.IMMARY 3/16/2006 Set IBP @ 9,820'. TOOH and RDMO Job Complete!!! 3/16/2006 Load crude and meoh standby for snow removal on Y-pad road and pad (continued on 3/17/06) 3/17/2006 (continued from 3/16/06) T/I/O= 1700/1700/250 ,CMIT- TxlA to 2400 psi. Pumped 123 bbls of crude down tbg. WHP= 1300/2100/250 , stopped pumping and started bleeding gas off IA bled IA to 400 psi rig down FWHP=800/400/250 .. 3/19/2006 T/IIO=1100/600/250 CMIT TBGXIA (waiver comp) Pumped 155 bbls crude to reach test pressure lost 180 psi in first15 min and 80 psi in second 15 min total loss 260 psi test 2 lost 160 in first15 min and 60 in second 15 min total loss of 240 psi (testing continued on 3/20/06) 3/20/2006 (continued from 3/19/06) CMIT TBG X IA (waiver comp) PASSED on th~rd " attempt lost 100 psi in first 15 min and 50 psi in second 15 min total loss of 150 psi bleed pressure off to 500 psi ig up to OA MIT -OA TO 2400 PASSED on second attempt pumped 7 bbls to reach test pressure oa lost . 200 psi in first 15 min and 60 psi in second 15 min total loss 260 psi on second attempt oa lost 60 psi in first 15 min and 40 psi in second 15 min total loss 100 psi bled back pressure to 250 psi FWHP=500/1000/250 3/24/2006 ***WELL S/ ON ARRIVAL ***(post cmit pIt maint) DRIFT W/ 3.625 CENT AND S.B TO 9812' SLM. NO RECOVERY IN SB. RIH W/ BAKER EO. SLEEVE AND 2.5 JU, PULL IBP FR. 9812' SLM. RECOVERED 1 ELEMENT. RIH W/ 3.5 CENT AND 4 PRONG WIRE GRAB TO BOTTOM @ 10540' ./ SLM. (DID NOT RECOVER ELEMENT) **** WELL LEFT SHUT IN AND TURNED OVER TO DSO **** FLUIDS PUMPED BBLS 1 I ::::L 1 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth 5CANNED JAN 2 (} Z006 Well Job# Log Description Date BL Z-01 11087166 LDL 08/05/05 1 Y·13 10(-II~ N/A PRODUCTION LOG 05/01/05 1 L2-14B 10670029 PROD PROFILE 08/20/04 1 Y -08A 11047356 MEMORY/SENSA LDL 10/15/05 1 X-36 11075908 MEMORY INJECTION PROFILE 08/17/05 1 X-30 10662973 GLS 12/02103 1 S-29A 11087187 INJECTION PROFILE 10/04/05 1 P2-01 11072880 LDL 08/06/05 1 OS 12-08C 11087208 SBHP SURVEY 12/24/05 1 0.5. 09-28A 11094347 LDL 12/28/05 1 P2-34 N/A INJECTION PROFILE 06/02/05 1 Q-05A 11087203 SBHP SURVEY 11/27/05 1 NK-09 11062632 PROD PROFILE WIDEFT 07/01/05 1 NK-38A 11075902 MEMORY PROD PROFILE 07/27/05 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: 01/04/06 NO. 3642 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay, Milne Pt. Color CD ~. .-" Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth £: Receivedbô~h BP Exploration(Alaska), Inc. Y-t3 Prudhoe Bay Pressure (psia) GAS LIFT SURVEY March 21, 1999 FBHP = PSIA Temperature (deg F) D Temp LF~ Di~ln~ Sm~zs h~.L m0 1~0 2200 1700 2700 37OO 470O 5700 6700 7700 8700 97OO 10700 i i 1~ ~0 220 240 i i Test Data DATE FLUID OIL GAS WATER GOR LG CSG P TGOR TGLR CHOKE MP MT W CUT March 2 82 033 0 86 249 2635 341 1371 12850 1487 949 286 167 88 4 10, 1999 MBD MBOD MMSCFD MBWPD SCF/STB MMSCFD PSIG SCF/STB SCF/BBL DEG PSlG DEGF % Wellhead Data WHP WHT IA OA 230 128 1400 700 ps~g deg F ps~g ps~g Depth (MD) 9,212 8,743 8,230 7,602 6,893 5,168 3,002 Depth (TVD) 7,805 7,421 7,005 6,524 6,010 4,793 2,916 RECEIVED CONSERVATION COMMISSION ALASKA OIL AND GAS / December 30, 1994 Jerry Bixby/Steve Farris Wireline/Completion Supervisors BP Exploration (Alaska), Inc ? O Box 196612 Anchorage, AK 99519-6612 Re: No-Flow Verification 15 BPX PBU Wells TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE' (907) 279-1433 FAX (907) 276-7542 Dear Mr. Bixby/Farris: Our inspectors witnessed no-flow tests on and recommended no-flow status for the 15 B?X ?BU wells listed below. The wells were open to an atmospheric tank to determine fluid production and monitored through a gas meter to determine gas production rates. The inspectors recommended "no-flow" status for the wells listed below. Well No. PTD No. Test Date ~nspector Fld Rate Gas Rate S - 29 92-099 12/08/94 Grimaldi 0 30 scf/hr P - 04 91-076 12/18/94 Foster 0 0 scf/hr P - 12 91-017 12/18/94 Foster 0 0 scf/hr P - 15 90-176 12/18/94 Foster 0 0 scf/hr P - 16 90-163 12/18/94 Foster 0 0 scf/hr X - 21 93-111 12/18/94 Foster 0 0 scf/hr X - 25 84-034 12/18/94 Foster 0 0 scf/hr R - 08 81-001 12/19/94 Foster 0 0 scf/hr R - 17 81-164 12/19/94 Foster 0 90 scf/hr U - llA 93-081 12/19/94 Foster 0 135 scf/hr U - 12 85-182 12/19/94 Foster 0 180 scf/hr U - 13 78-101 12/19/94 Foster 0 120 scf/hr Y - 02 79-066 12/19/94 Foster 0 120 scf/hr Y - 13 81-112 12/19/94 Foster 0 0 scf/hr Y - 33 91-030 12/19/94' Foster 0 200 $cf/hr The above wells meet the criteria of a "no-flow" performance test and as such are considered incapable of flowing, unassisted, to the surface. Under the authority of Conservation Order 341, Rule 5, these wells are not required to have fall-safe automatic SSSVs. However, the LPSs and SSVs must be maintained in good condition and, if for any reason, the wells again become capable of unassisted flow of hydrocarbons, the SSSVs must be reinstalled and maintained in good working condition. Sincerely, Blair E. Won~ell PI Supervisor MEMORANDUM State of Alaska Alaska Oil and Gas Conservation ~3~'mmission TO: THRU: FROM: David John~~, Chair~ .~ DATE: BlairWondzell, ~ FILE NO: P. I. Supervisor /z('~.3 Bobby Fost~er~. r4~ x~>'~ SUBJECT: Petroleum Inspector December 19,20 & 21, 1994 ll91LSBD.doc No Flow Test BPX - PBU - R,Y & U Pads Prudhoe Bay Field Monday, December 19, 1994: I met with Jeff Eckstein, BPX P.E., and continued No Flow test. The wells were tested using the American 425 gas measurement meter used previously in the field. There were 5 wells to be tested, but only 2 were tested. Wells R-9, 21, and~ould not bleed down, so only wells R-8 and 17 were tested. The crew began bleeding the wells on .R pad down in the afternoon of 12-18-94. The bleed down of the Y pad wells began in the afternoon of 12-19-94. The bleed down on the X pad wells began on the after noon of 12-20-94. The gas meter was tied into tubing at the swab cap on each well and a reading was taken approximately every hour for 3 hours with the following results: WELLR-08 8l-oof Casing pressure - 240 psig Tubing pressure- 0 psig Water Cut - 65.2% Test # 1 - 6 sd/hr. Test # 2 - 5 scf/hr. Test # 3 - 0 sd/hr WELL R-17 ~ - ~44, Casing pressure - 435 psig Tubing pressure - 0 psig Water Cut - 75.9% Test # 1 - 120 scf/hr. Test # 2 - 90 scf/hr. Test # 3 - 90 scf/hr. WELL Y-02 7 ~ - ¢~;~ Casing pressure - 290 psig Tubing pressure- 0 psig Water Cut - 66.9% Test # 1 - 120 scf/hr. Test # 2 - 120 sd/hr. Test # 3 - 120 sd/hr. WELL Y - 13 9/-~' (z. Casing pressure - 200 psig Test # 1 - 40 sd/hr. Test # 2 - 0 scf/hr. Page 2/2 Tubing pressure -0 psig Water Cut - 71.0% Test # 3 - 0 scl/hr. · , WELLY-33 at-o3~ Casing Pressure - 200 psig Tubing pressure - 0 psig Water Cut - 64.2 % Test # 1- 550 sd/hr. Test # 2 - 210 scl/hr. Test #.3 - 200 scl/hr. WELL U-11A 9 ~'-e-~ Casing pressure - 520 psig Tubing pressure - 0 psig Water Cut - 97.4% Test # 1 - 150 scl/hr. Test # 2 - 135 scf/hr. Test # 3 - 135 scf/hr. WELL U-12 Casing presssure - 520 psig Tubing pressure - 0 psig Water Cut - 69.6% Test # 1 - 540 scl/hr. Test # 2 - 190 scl/hr. Test # 3 - 180 scl/hr. WELL U-! 3 -., ~ - ~ o I Casing pressure - 250 psig Tubing pressure - 0 psig Water Cut - 60.0% Test # 1 - 120 scl/hr. Test # 2 - 180 scl/hr. Test # 3 - 120 scl/hr. All of the above listed wells met the requirements set forth by the AOGCC concerning wells with a NO FLOW status. -~,y ~¢,¢/~ ~t~ -¢/,.,,',~ ~¢,-~d~ ;H~ ~ Summary: I witnessed the acceptible NO FLOW test on the above listed BPX- PBU wells. -.. Attachment: NONE LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 29 September 1994 RE:, Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described belows WELL ~~~-~ DESCRIPTION E-20 (24-05-11-14) i CN/GR LDWG TAPE+LIST ECC No. Run # i 1470.01 Run # 1 4811.01 Run ~ I 6221.01 Run # i 6262.00 Run ~ 1 6269.00 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 /'9 Attn/~Sdney D. Paulson Received ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 2 September 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PDK/GR/CCL FINAL BL 1 PDK/GR/CCL RF SEPIA Run # 1 Run # 1 ECC No. 4811.01 (23-34-11-13) 1 PL/PROFILE FINAL BL Run # 1 4986.03 1 PL/PROFILE RF SEPIA Run # 1 Run # 1 5607.08 Run # 1 Run # 1 6002.01 Run # 1 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 ,~ anchor~ge~ AK 99518 ~ At~/R~ney D. Paulson ~lea s iKn snd re~ux~ to: Petrotechni~al Data Center BP Exploration (Alaska) Inc 900 East Benson Boulevard Anchorage, Alaska 99508 Received by Date STATE OF ALASKA ALA~r~' ')IL AND GAS CONSERVATION COMMISSI(~ REPORT Or: SUNDRY WELL OP ,ATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Repair well Other Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development :X Exploratory Stratigraphic 4. Location of well at surface 1479' SNL, 528' WEL, SEC. 33, T11N, R13E, UPM At top of productive interval 791'SNL, 424' EWL, SEC. 33, T11N, R13E, UPM At effective depth 752' SNL, 365' EWL, SEC. 33, T11N, R13E, UPM At total depth 613' SNL, 145' EWL, SEC. 33, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical 11290 feet Plugs (measured) BKB 9652 feet 6. Datum elevation (DF or KB) KBE = 85.54 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number Y-13 (11-33-11-13) PBU 9. Permit number/approval number 81-112 / 10. APl number 50- 029-20634 11. Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical 10648 feet Junk (measured) BKB 9068 feet Casing Length Structural -- Conductor 110 Surface 2645 Intermediate 10322 Production -- Liner 1437 Perforation depth: measured Size Cemented 20x30 8 c.y. 13 3/8 3790 c.f. 9 5/8 1335 c.f. 7 10502'- 10522', 10522'- 10552' 10576'-10606', 359 c.f. Measured depth True vertical depth BKB 145 145 2680 2680 10357 8819 9853-11290 8412-9652 Sqzd: 10552'-10554', 10558'- 10566', true vertical subsea 8855'-8872' Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9779' with 4 1/2" tailpipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779~ 4 1/2" SSSV at 2043' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) RECEIVE[ jUN ~0 1994 ~,~H & Gas CoDs. Coml Anchorage Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1260 1948 3252 1850 224 Subsequent to operation 1310 1683 3091 1845 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby certify that the for_egoing is true and correct to the best of my knowledge. Signed (~/'tou~O~,, ~/~ ~~^ Title Senior TechnicalAssistantl 218 Service Form 10-404'Rev 08/15/88 SUBMIT IN DU~SLICATE ~ission 08~7~3 fjh 6/27/94 WELL Y-13(11-33-11-13) Addn~rf The following additional intervals were perforated using 3 3/8" guns, 4 SPF, random orientation and 120° phasing. 10385' - 10413' MD RECEIVED JUN 30 1994 A~ska Off & Gas Co,r~. GO~Ttmissmn A ..,~, OIL AND GAS CONSERVATION COMMI ~,.'N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operabon shutdown __ Stimulate Plugging__ Pull tubing Alter casing Repair well Perforate X Other × 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1479' SNL, 528' WEL, SEC. 33, T11N, R13E, UPM At top of productive interval 791' SNL, 424' EWL, SEC. 33, T11N, R13E, UPM At effective depth 752' SNL, 365' EWL, SEC. 33, T11N, R13E, UPM At total depth 613' SNL, 145' EWL, SEC. 33, T11N, R13E, UPM 5. Type of Well: Development X Exploratory Strat~graphlc Serwce 6. Datum elevation (DF or KB) KBE = 85.54 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y- 13 (11-33-11-13) PBU 9. Permit number/approval number 81-112 / 10. APl number 50- 029-20634 .11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length .. 11290 feet BKB 9652 feet 10648 feet BKB 9068 feet Size 110 20x30 2645 13 3/8 10322 9 5/8 1437 7 Plugs (measured) Junk (measured) Cemented 8 c.y. 3790 c.f. 1335 c.f. 359 c.f. measured 10502'- 10522', 10522'- 10552' 10576'- 10606', true vertical subsea 8855'-8872' Tubing (size, grade, and measured depth) Measured depth True vertical depth BKB 145 145 2680 2680 10357 8819 9853-11290 8412-9652 Sqzd: 10552'- 10554', 10558'- 10566', 4 1/2" L-80 to 9779' with 4 1/2" tailpipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779'; 4 1/2" SSSV at 2043' 13. Stimulation or cement squeeze summary 14. see attachment Intervals treated (measured) Treatment description including volumes used and final pressure Prior to well operation Subsequent to operation Representative Dady Average Production or In!ection D~,t~, OCT - ? 1993 Alaska 0il & Gas Cons. uommiss Anchorage. OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 510 798 266 2000 1480 ~.~l~ 1462 4670 1050 Tubing Pressure 209 246 15. Attachments Copies of Logs and Surveys run Dally Report of Well Operations 16. Status of well classification as: Od X.. Gas Suspended ......... Service 17. I hereby qerbfy that the foregoing is true and correct to the best of my knowledge. Signed ~"~~ ~'~ ~:~~ Title Senior Techn,calAssistantl Form 10-40~ Rev 06/15/88 Date SUBMIT IN DUP'LI~ATE ( 7/9/92 07105/92 06/24/92 WELL Y-13(11-33-11-13) Refrac/Reperf/Frac Performed a Hydraulic Refracture(Ivishak) Treatment using the following fluids: 30 159 90 DIRTY 1PPG 12 DIRTY 2 PPG 19 DIRTY 4PPG 22 DIRTY 6PPG 278 DIRTY 8PPG 163 DIRTY BBLS 40# GEL PREPAD TO ESTABLISH RATE BBLS 40# X-LINK GEL PAD 16 DIRTY 3 PPG 21 DIRTY 5 PPG 23 DIRTY 7PPG 20# LINEAR GEL FLUSH The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 10507_'- 10557_' MD Performed a Hydraulic Fracture(Ivishak) Treatment using the following fluids: 10 BBLS 45# GEL PREPAD TO ESTABLISH RATE 170 BBLS 45# X-LINK GEL PAD 50 DIRTY 1PPG 12 DIRTY 16 DIRTY 3 PPG 18 DIRTY 20 DIRTY 5 PPG 22 DIRTY 23 DIRTY 7PPG 174 DIRTY 2PPG 4PPG 6PPG 8PPG fjh 7/01/93 RECEIVED OCT - 7 1993 Alaska 0il & 6as ~ons, Anchorage BP EXPLORATION BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-$111 BPX/PBU~OGS DATE: 09/07/93 T# 84979 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. B-19~'O~ CNLiG~ 08/26/93 #1 C-14 3~-~ ~TUBING CUTTER~CCU08/27/93 #1 E-23~-1%5 ~UBING CUTTER3C~U08/27/93 #1 H-24~k%-%O5 CNL~G~ 08/25/93 #1 S-31q0-15~ ~ERF)~~fZJ~ 08/27/93 ~1 X-16~%-~Z CNL~ 08/25/93 ~1 9030.00- 9674.00 ATLAS 5 " 9800.00- 9970.00 ATLAS 5 " 10030.00-10210.00 ATLAS 5 " 9550.00- 9870.00 ATLAS 5 " 10680.00-10900.00 ATLAS 5 " 10160.00-10586.00 ATLAS 5 " 10280.00-10480.00 ATLAS 5 " Information Control Well Records BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 /0 DATE: 07/13/92 T# 83702 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. B-27 C-12 ~Z~ CNL C-22 CNL c-3 4 CNL D-15 CNL N-24 GR Y-13 ~/~;;~ PFC 07/05/92 #! 07/08/92 #6 11100 07/08/92 #1 9300 07/08/92 #1 8750 07/09/92 #6 9800 07/10/92 #! 10850 07/09/92 #1 10700 07/10/92 #3 8860 07/08/92 #1 9870 07/08/92 #1 9191 07/09/92 #1 9150 07/05/92 #i 10500 00-11041.00 ATLAS 5 " 00-11950.00 SCH 5 " 00-10083 00 ATLAS 5 " 00- 9570 00-10601 00-11685 00-11332 00- 9411 00-10145 00-10374 00- 9592 00 ATLAS 5 " 00 SCH 5 " 00 SCH 5 " 00 SCH 5 " 00 SCM 5 " 00 SCH 5 " 00 SCH 5 " 00 ATLAS 5 " 10400 00-10650 00 ATLAS 5 " Information Control Well Records Adrian J. Martin R CEIVED BP EXPLORATION BP Exploratton (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 06/30/92 T# 83659 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. C-20~-73 LEAK DET C-28~-/~~' PROD-F N-014~_~~ PRODUCTION LOG R-2 GAS LIFT SURVEY Y-13 ~l~tt~ ~s ~f~_~J S~S ENTRY SURVEY 5 " B-20~/~GAS ENTRY SURVEY 5 N-070,~,~ GAS ENTRY SURVEY 2/5" GAS LIFT SURVEY 06/05/92 #1 06/13/92 #1 06/05/92 #1 06/06/92 #1 06/25/92 #2 06/09/92 #1 06/14/92 #1 06/03/92 #1 06/26/92 #1 2500.00-10560.00 CAMCO 2 " 5600.00- 5950.00 CAMCO 5 " 8400.00-11350.00 CAMCO 2/5" 10800.00-11000.00 CAMCO 5 " 8700.00- 8975.00 SCH 5 " 3200.00- 9507.00 CAMCO 2/5" 11250.00-11830.00 CAMCO 5 " 0.00-10300.00 CAMCO 2/5" 10350.00-10688.00 SCH 5 " 06/04/92 #1 8950.00- 9148.00 CAMCO 06/04/92 #1 9600.00- 9860.00 CAMCO 06/03/92 #1 10300.00-10500.00 CAMCO 06/14/92 #1 0.00-10575.00 CAMCO Information Control Well Records Adrian J. Martin RE EiVED JUL 1 4 1992 Alaska 0ii & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 09/11/91 T#:82799 FROM: SUBJECT: Information Control Well Records LR2-1 BP CA.,~ED HOLE FINALS Enclosed is your copy of the matedal listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. Y-13 PRODUCTION LOG 09/06/91 #1 10420-10662 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :09/05/91 T~82~ FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Y-13.. GAS LIFT A-26... LEAK-DET B-26,. PROD-F ~ --P-03.. GR/CCL/TAG H-06.. PROD-F (~\.i 71~-Y'34- PROD-F H-17'- PROD-F 08/16/91 #1 300-10520 CAMCO 2" 08/15/91 #1 000-10160 CAMCO 2/5 08/15/91 #1 10850-11250 CAMCO 5" 08/15/91 #1 9870-10375 CAMCO 5" 08/13/91 #1 11100-11250 CAMCO 5" 08/14/91 #1 9450-9660 CAMCO 5" 08/15/91 #1 9450-9720 CAMCO 5" 08/13/91 #1 10300-10742 CAMCO 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES t?ECEIVEF 1 1 1991 0 d~ OIL AND GAS CONSERVATION COMMIS N - REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1479' SNL, 528' WEL, SEC. 33, T11N, R13E, UPM At top of productive interval 791'SN1., 424'EWL, SEC. 33, T11N, R13E, UPM At effective depth 752' SNL, 365' EWL, SEC. 33, T11N, R13E, UPM At total depth 613'SNL, 145' EWL, SEC. 33, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Stimulate Alter casing. Plugging. Repair well .... 5. Type of Well: I~vetopm~nt X' Expiora~ry ., S~ 11290feet 9652feet Plugs (measured) Perforate ... Other 6. Datum elevation (DF or KB) KBE = 85.54 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y. 13 (11-33-11-13) PBU 9. Permit number/approval number 81-I 12/90-200, 90-620 10. AP! number 50- 029-20634 11. Field/Pool Prudhoe Oil Pool Effective depth: measured true vertical 10648feet BKB 9068feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 110 20x30 8 c.y. 2645 13 3/8 3790 c.f. 10322 9 5/8 1335 c.f. measured 1437 7 359 af. 10502'- 10522', 10522'- 10552' Measured depth True vertical depth BKB 145 145 268O 268O 10357 8819 9853-11290 8412-9652 Sqzd: 10552'-10554', 10558'-10566', 10576'-10606', 10623'.10638° true vertical subsea 8855'-8872' Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9779' with 4 1/2' taJlpipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779~ 4 1/2" SSSV at 2043' RECEIVED "~3. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure APR 1 2 t991 Alaska 0il & Gas Cons. C0mmis." Ancl~orag~ 14. Reoresentative Daily Ave[~,ge Production or Iniection Data OiI-Bbi Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 20 Subsequent to operation 700 "'1~. Attachments ' Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas .... Suspended.., 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed '~,~. /J~'.,x,,,...-...-'~ ~.C, J~o,,O/..~ Tile Form 10-404 Rev i~6~5)88 ~ ' 204 1166 758 977 150 983 16. Status of well classification as: 196 201 Service Supervisor Waterflood/Miscible Flood Date !, SUBMIT IN DUPLICATE .... OB ( WELL Y-13 (11-33-11-13) PBU CTU CEMENT SQUEEZE/REPERF/HYDRAULIC FRACTUING OPERATION~ 2/12/91 2/24/91 Rigged up coiled tubing and pressure tested BOP equipment ct 3000 psi. Pumped cement and squeezed off all perforations. Rigged up Schlumberger and reperforated the interval 10502'-10522°-MD-BKB using 3-3/8" carrier guns at 4 spf. 2/25/91 Underreamed cement and cleaned out wellbore. 3/2/91 3/3/91 Performed hydraulic fracture of lvishak perfs. Cleaned out proppant. Well was returned to production and tested. RECEIVED APR 1 ~' t991 Alaska Oil & Gas Cons. Commissio~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :03/04/91 T#:82131 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below, If you have any questions, please contact BP Well Records at (907) 564-4445. D-16 Peal 02/26/91 #1 9600-10050 Sch 5" Y-13 PFC 02/24/90 #1 10200-10771 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :11/06/90 T#:81781 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. J-01 TDT-P BORAX 11/01/90 #1 8500-9089 SCH 5" Y-13 INJ 10/31/90 #1 10400-10657 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED NOV 1 4 1990 Alaska 011 & ~ss Cor~s. Commission An0horags BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 10/18/90 T#:81601 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. G-07 PERF 10/13/90 #1 11000-11300 SCH 5" W-17 PERF 10/14/90 #1 11380-11840 SCH 5" Y-13 PERF 10/11/90 #1 10400-10676 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevarcl PO. Box 196612 Anct~orage, Alasl(a 99519-6612 (907~ 561-5111 TO: DISTRIBUTION Date :09/13/90 T#:81648 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4d~.5. M-06 Completion 08/06/90 #1 10997-11577 Sch 5 R-26A Completion 08/09/90 #1 9093-9392 Sch 5" Y-13 Completion 08~07~90 #1 9 850-10678 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSClENCES MOBIL PHILLIPS ARCHIVES RECEIVED S E P 1 7' 1990 Alaska 0il & Gas Cons, C0mm'tssiot~ Anchorage 1. Type of Request: ¢ ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION _ APPLICATION FOR SUNDRY APPROV I Abandon ~ Suspend Opera~aon Shutdown Re-enter suspended well~ Alter casing ~ Repair well ~ Plugging ~ Time extension Stimulate ~ Change approved program Pull tubing Vanance Perforate x O~er x 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) BP Exploration (Alaska) Inc. Development x KBE = 85.54 AMSL feet Exploratory 3. Address Stratigraph~c 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 semce Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1479'SNL, 528'WEL, SEC. 33, T11N, R13E, UPM At top of productive interval 791' SNL, 424' EWL, SEC. 33, T11N, R13E, UPM At effective depth 750' SNL, 352' EWL, SEC. 33, T11N, R13E, UPM At total depth 613'SNL, 145' EWL, SEC. 33, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2645 Intermediate 10322 Production -- Liner 1437 Y-13 (11-33-11-13) PBU 9. Permit number 81-112 10. APl number 50- 029-2O634 11. Field/Pool Prudhoe Oil Pool 11290 feet BKB 9652 feet 10670 feet Plugs (measured) Junk (measured) fill at 10670°MD (06/87) BKB 9087 feet Size 20 x 30 13 3/8 9 5/8 Cemented Measured depth True vertical depth BKB 8 c.y. 145 145 3790 c.f. 2680 2680 1335 c.f. 10357 8819 7 359 c.f. 9853-11290 8412-9652 Perforation depth: measured 10508'-10528', 10538'-10554', 10558'-10566', 10576'-10606' true vertical subsea RECEIVED $860'-8945' (four intervals) A~.~ 0 9 1990 Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9779' with 4 1/2" tailpipe to 9940' Al.~ov._ _ -,or~ Oil ° ,,- - Packers and SSSV (type and measured depth) 9 5/8 Baker SBR/packer at 9779; 4 1/2 SSSV at 2043 ~Jl~- ',~.~~! 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X July 1990 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test ~ Location clearance Mechanical Integrity Test ~ Subsequent form required 10- ORIGINAL SIGNED BY Approved by order of the Commission ! flNNIE C. SM!TI'I 14. Estimated date for commencing operation Form 10-403 Rev 06/15/88 15. Status of well classification as: Susp,,n., ECEIVED Gas Cons. C0mais 40 row,.o. 90 ..... ~ _,-,~ O'~e6 ,, Commissioner Date ~ '-"/~,l - ~'~ SUBMIT IN TRIPLICATE ion WELL Y-13 (11-33-11-13) pBU ADD'L. PERFORATION_W/CTU SQUEI=7'E PROPOSAt We propose to perform a CTU cement squeeze during August 1990 Upon successful completion of squeeze we propose to perforate the following intervals: 10606' -10646' MD BKB 10502' -10508' MD BKB 10502' -10528' MD BKB 10538' -10554' MD BKB 10558' -10566' MD BKB 10576' -10606' MD BKB (Add Perf) (Add Perf) (Reperf) (Reperf) (Reperf) (Repeal) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. RECEIVED AUG o 91990 · ai/~a ~.& Gas Cons. ~mmissior~ '' ~ohorag~ LKL:8/7/g0 INJECTOR HEAD PACK OFF QUICK UNION BOP STACK BLIND SHEARS ,J'-- BLIND SHEARS WHP SENSOR , .J"-- PIPE SLIPS PIPE RAMS - - KILL LINE CONNECTION FLANGED CONNECTION SWAB VALVE TYPICAL CTU STACK FORM 1481 5/I0/89 BP EXPLORATION March 10, 1989 BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Y-13 (11-33-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, Supervisor Waterflood & Miscible Flood BJP: JAM Enclosures (9) cc: L. Burke (MB12-1) Well File RECEIVED Gas Cons. Commissi0i~ ~mchorage ' AL STATE OF ALASKA · ~KA OIL AND GAS CONSERVATION COMMI ,JN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend Operalion Shutdown __ Re-enter suspended well~ Alter casing __ Repair well Plugging Time extension __ Slimulate __ Change approved program Pull tubing ~ Variance__ Perforate X Olher~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1479' SNL, 528' WEL, SEC. 33, T11N, R13E, UPM At top of productive interval 791' SNI., 424' EWL, SEC. 33, T11N, R13E, UPM At effective depth 750' SNL, 352' EWL, SEC. 33, T11N, R13E, UPM At total depth 613' SNL, 145' EWL, SEC. 33, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11290 feet true vertical BKB 9652 feet 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 85.54 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-13 (11-33-11-13) PBU 9. Permit number 81-112 10. APl number 50- 029-20634 11, Field/Pool Ptudhoe Oil Pool Plugs (measured) Effective depth: measured 10670 feet true vertical BKB 9087 feet Junk (measured) fill at 10670'MD (06/87) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth - - BKB 110 20 x 30 8 c.y. 145 145 2645 13 3/8 3790 c.f. 2680 2680 10322 9 5/8 1335 c.f. 10357 8819 measured .e 1437 7 359 c.f. 9853-11290 10508'-10528', 10538'-I0554', 10558'-10566', 10576'-10606' true vertical subsea 8860'-8945' (four intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9779' with 4 1/2" taiipipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779'; 4 1/2" SSSV at 2043' 8412-9652 RECEIVEC MAR i ? daska,0Jl & Gas Cons, C0mm 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation February 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Service Gas Suspended 17. I hereby certify that the foregoing i~ true. nd correct to the best of my knowledge. Signed~ JJ~ Title SupervisorWatedlood/MiscibleFIood / 7' FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance Mechanical Integrity Test~ Approved by order of the Commission Form 10-403 Rev 06/15/88 Subsequent form required 10- ~.__~__m~.o~ed Copy ORIGINAL SIGNED BY ! dNNIE C. SMITH J Approval No. ~..~ OIP Returne(;J~.... ,'o~ cv ,.~ ~,~'~ Commi~'sioner Date ~ '"/'~' ""'~' SUBMIT IN TRIPLICATE WELL Y.13 ¢11.33-11-13~ PBU ADD~L. PERFORATIQN PRQPOSAL We propose to perforate the following Sag River interval during February 1989: 10385' - 10412' MD BKB (Ref. BHCS, 8/16/81) A lubricator will be installed and tested to 3500 psi for all well work. Thc well will bc returned to production immediately following perforating operations, then tested. jm 2/10/89 FLOW TUBES & PACKOFF BOWEN PACKOFF GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE FLOWLINE VALVE RISER GREASE MANIFOLD BOP GREASE PUMP --,-GREASE RESERVOIR Slanda~d Alaska ( Procluct~on Gompan~ 900 East ~n-.on 8oulevord PO i~m= 19661? Anchorage. Alaska 99519-6617 (907! .~64-$11 I HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OFALASKA GEOSCIENCES RESERVOIR REFERENCE:: ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED 5-'rANDARD ALASKA PEODUCTION Date: 12-19-88 TI: 79650 The following material Is being submitted herewith. signing a copy of this letter and returning It to thls office: W-22 CCL 11-21-88 ~1 H-23 FM/Temp 11-22-88 #1 Y-13 FM/Temp Gas Lift 11-20-88 #1 H-28 Prod-F 11-23-88 #1 B-24 Prod-F 11-24-88 #1 N-O4A Prod-F : 11-26-88 #1 Please acknowledge receipt by 8650-9680 Camco 5" 100-10150 Camco 5" 10400-10637 Camco 5" 30-12258 Camco 5" 30-10650 Camco 5" 8450-10441 Camco 5" Received Date A une! ot the of,g,no| $1ondord O~1 COml:)Qny Founded .~ Cleveland. Oh,o. ,n 1870 Shirely R. McCurry I NFORNAT I ON CONTROL Wel I Records LR2-1 Standard Alaska ( Production CompaR, 900 East I~nson Boulevard PO Bo,. 196612 Anchoroge. AID&kO 99519 6612 1907! 564 5111 INDEXED DALLAS ARCO CHEVRON STANDARD ALASKA PROD JCTION EXXON TEXACO Date: 08/12/87 TO: . HOBIL TI: 78119 PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter end returning It to this office: B-12 Cont. Flow 06/14/87 C-27 eCL/Perf. 06/29/87 E-9 Cont. Flow Survey 06/29/87 F-4 Collar Log 06/15/87 _ 29 Spinner/Emp./Fluid 07/04/87 7 CNL 08/05/87 ¥-13 GR 06/28/87 #1 8850-9308 ,?~ 5" #1 10900-11200 GO 5" #1 10600-10882 GO 5" #1 8500-8720 GO 5" #1 8800-11575 GO 5" #4 10950-12100 Sch 5~ #1 10250-10652 GO 5" Race I ved Date CEI E AUGT'7 1987 Oil & Gas Cons. Commissiea Anchorage Victoria Aldridge I NFORMAT I ON CONTROL We I I Records LR2-1 A un,f of the ot,g,nol Stondo,d Od Co,npon¥ Founded ,n Clevelar*d Oh,o ,n 187(1 Standard Alaska Product,on Compa~ 900 East Benson PO Box 196612 Anchorage, Alaska 99519 6612 (907) 561 5111 July 20, 1987 STANDARD ALASKA PRODUCTIOI Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Y-13 (11-33-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB: JAM ~ ~ J. A. Bragg Supervisor Production Operations Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 Y-13 Well File A umt of the or,glnol Standard O,I Company Founded ,n Cleveland Oh,o, ,n 1870 REPORT OF SUNDRY WELL ERATIONS 1 Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. NameofOperator 5 Datumelevat~on(DForKB) STANDARD ALASKA PRODUCTION COMPANY KBE = 85.54 Feet 3 Address 6 UnitorProperty name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4 Locahon of wellatsurface 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM Attop ofproduchve~nterval 791' SNL, 424' EWL, Sec. 33, TllN, R13E, UPM Ateffective depth 623' SNL, 159' EWL, Sec. 33, TllN, R13E, UPM Attotaldepth 613' SNL, 145' EWL, Sec. 33, TllN, R13E, UPM 7 Well number Y-13 (11-33-11-13) PBU 8 Approval number 7-240 9 APl number 50--029-20634 10. Pool Prudhoe Oil Pool 11 Present well cond~hon summary Total depth, measured true vertical 11290 feet 9652 feetBKB Plugs (measured) Effective depth: measured 11240 true vertical 9605 feet Junk (measured) feetBKB Casing Length S~ze Structural -- Conductor 59 ' 20 "x30" Surface 2629 ' 13 3/8" Intermediate 10306 ' 9 5/8" Production -- L~ner 1437 ' 7" Perforation depth measured 10508' - 10606' true vertmal (ss) 8860' - 8945' 12. Cemented 8 cu.yds. 3790 c.f. 1335 c.f. 359 c.f. (four intervals) Tubing (s~ze, grade and measured depth) 4 1/2" L-80 to 9779' with 4 1/2" tailpipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779'; 4 1/2" SSSV at 2043' Stimulation or cement squeeze summary See attachment Intervals treated (measured) Measured depth 110' 2680' 10357' 9853'-11290' Treatment descnphon ~nclud~ng volumes used and final pressure True Verhcal depth BKB iL0 ' 2680 ' 8819' 8412'-9652' ,.. 13 Prior to well operation Subsequent to operation Representative Daily Average Production or Injechon Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 250 144 168 965 188 2440 2470 1650 1613 210 14 Attachments Da~ly Report of Well Operahons [] Cop~es of Logs and Surveys Run [] 151 hereby certify that the foregoing is true and correct to the best of my knowledge S,gned ~ 3'. /a, Form 10-404 Rev 12-1-85 Title Supervisor Production Operations Date Submit m Duplicate · Well Y-13 (11-33-11-13) PBU STIMULATION OPERATIONS 4/18/87 Performed a 2000-gal. 15% HCl perforation wa~via coiled tubing on the following perforated intervals: 10508' - 10528' MD BKB 10538' - 10554' MD BKB 10558' - 10566' MD BKB 10576' - 10606' MD BKB Returned well to production and tested. 6/24/87 Performed a 15% HCl/xylene perforation was~with foam diverter via coiled tubing. Returned well to production and tested. 7/1/87 Performed a scale inhibition treatment w/EDTA preflush via coiled tubing as follows: 10 bbls. diesel w/EGMBE 45 bbls. EDTA 88 bbls. scale inhibitor solution 335 bbls. seawater overflush 20 bbls. diesel Returned well to production and tested. jR 7/16/87 $1anda,d Alaska C~''~ P~odu¢l'~on Compnny 900 EDit 8,'nson Boulevo,d PO 8o. 19661? Anchorage AlonZo 99519 6617 f9071 564 51 I I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD ALASKA PRODUC TIOI',~ 04/04/87 Date: TI: 77859 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning it to this office: J- 23 J- 23 J- 23 D- 27 G- 25 Y-13 CBT 04/25/87 2626-9814 Sch 5" #2 CET 04/25/87 26 26-984 2- Sch 5" # 2 C.H.CNL 04/25/87 2626-9782 Sch 5" #2 Completion Record 04/23/87 9420-9680 Sch 5" #2 Prod. Profile 04/20/87 10250-10496 Sch 5" G.R. 04/25/87 10250-10655 Sch 5" #1 #1 EC E laska O,! & g0 a0;2' C0mmissL, n % Rece i ved Date fou,.ded ,.~ (It.elu,.d C~,,,, ,,, Celina Plack I NFORMAT I ON CONTROt Wel I Records LR2-1 Standard Alaska f Productton Company ~ 900 East Benson Boulevb,~ PO Box 196612 Anchorage, Alaska 99519 6612 ~907) 561 5111 STANDARD ALASKA PRODUCTION Apri; 9, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Y-13 (11-33-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB: JAM~ Enclosures (9) cc: J. L. Haas (MB12-1) Y-13 Well File J. A. Bragg ~ Supervisor Production Operations A un,t of the or,g,nal Standard O,I Company Founded ,n Cleveland, Oh,o, ,n 1870 STATE OF ALASKA ALASK( L AND GAS CONSERVATION COMM¢ ON APPLICAT,'ON FOR SUNDRY API'P, OVALS 1 Type of Request Abandon - Suspend - Operabon Shutdown ~- Re-enter suspended well -- Alter casing _- T~me extenmon- Change approved program Z Plugging- Shmulate _x Pull tubing ~ Amend order ~ Perforate- Other- 2 Name of Operator 5 Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY [4.BE = 85.54 feet 3 Address 6 Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4 Locahon of well at surface 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM At top of productive ~nterval 791' SNL, 424' EWL, Sec. 33, TllN, R13E, UPM At effective depth 623' SNL, 159' EWL, Sec. 33, TllN, R13E, UPM At total depth 613' SNL, 145' EWL, Sec. 33, TllN, R13E, gPM 7 Well number Y-13 (11-33-11-13) PBU 8. Permit number 81-112 9. APl number 50-- 029-20634 10 Pool Prudhoe Oil Pool 11 Present well cond~hon summary Total depth measured true vertical Effective depth measured true vertical 11290 feet Plugs (measured) 9652 feetBKB 11240 feet Junk (measured) 9605 feetBKB Casing Length Structural -- Conductor. 59 ' Surface 2629 ' Intermediate 10306 ' Production -- L~ner Perforation depth S~ze Cemented Measured depth True Vertical depth 20"x30" 8 cu.yds. 110' 110' 13 3/8" 3790 c.f. 2680' 2680' 9 5/8" 1335 c.f. 10357' 8819' 1437' 7" 359 c.f. measured 10508' - 10606' (four intervals) true vert~cal(subsea) 8860' - 8945' Yub~ng (s~ze, grade and measured depth) 4 1/2" L-80 to 9779' with 4 1/2" tailpipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779'; 4 1/2" SSSV at 2043' 12 Attachments 9853'-11290' 8412'-9652' Description summary of proposal ,~ Detailed operations program ~ BOP sketch 13. Esbmated date for commencing operation April 1987 14 If proposal was verbally approved Name of approver Date approved 15 I hereby certify that the foregoing is true and correct to the best of my knowledge sign'~'~~~ ~ Title Supervisor Production Operations Date ~ ~--~. ~~ ,,. Commission Use Only Conditions of approval [] Plug integrity [] BOP Test [] Location clearance Approved by Form 10-403 Rev 12-1-85 F~p ro ve~ Ccgy Returned Commissioner the commission Date ~// Submit ~n tr,pl~cate Well Y-13 (11-33-11-13) PBU STIMULATION PROPOSAL A 2000-gal. 15% HC1 perforation wash via coiled tubing, followed by a combination bullheaded EDTA/scale inhibitor treatment is proposed for the following perforated intervals in Well Y-13: 10508' - 10528' MD BKB 10538' - 10554' MD BKB 10558' - 10566' MD BKB 10576' - 10606' MD BKB The EDTA/scale inhibitor treatment consists of the following: 10 bbl. diesel w/EGMBE 2000 gal. EDTA 75 bbl. scale inhibitor treatment 470 bbls. seawater overflush 20 bbls. diesel Following the treatment the well will be put back on production and tested. jm 4/8/87 Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams ~ ] Cutter Rams 2" Chleksan (Kill Line) Slips Pipe Rams Pump-In Sub (C ircula te/R e turns) ell Head Swab Valve Standard Alaska Productmn Company [ 900 Earl 8~n~,on Boulev6[ PO ~ 19~12 An(homage. Alaska 99519 6612 1~7~ 564 5111 INDEXED DALLAS ARCO CH WO STANDARD ALASKA P ODUETION EXXON TEXACO Date: 02/20/87 TO: MOBIL TI: 77727 PHILLIPS f STATE OF ALASKA GEOSC IENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: B-23 F-17 F-17 H-13 H-26 J-1 N-3 N-3 N-8 S-18 T-7 Y-7 Y-13 Completion Record 09/23/86 #2 8340-9966 Sch 5" MWP-Measurement While Perf. 02/05/87 #1 10800-11374 Sch 5" Perf. Record 02/05/87 #1 10800-11374 Sch 5" Completion Record 01/31/87 #1 9200-9651 Sch 5" Completion Record 09/13/86 #1 9462-9989 Sch 5" Junk Basket 09/30/85 #1 8900-9128 Sch 5" Tubing Puncher 09/28/86 #1 9145-9600 Sch 5" Collar Record 10/11/86 #1 8172-9331 Sch EPL 07/10/86 #1 9595-9970 Sch 5" Completion Record 09/26/86 #1 11200-12003 Sch 5" Completion Record 09/25/86 #2 8900-9600 Sch 5" Completion Record 05/14/86 #1 8450-9845 Sch 5" Completion Record 09/14/86 #1 9590-10620 Sch 5" Y-24 Prod. Logging 02/02/87 #1 3100-13416 Dres 5" Alaska 0i1 & Clas Received Date A un, t al the o,,9,nol Standard C~I Company Founded ,. Cie-cio-cl. C~,o. ,n 1870 Victoria Aldridge I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Product,on Coml~ 900 East Benson I~ P O Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 October 15, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well Y-13 (11-33-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report' of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforatlon of the well. Yours very truly, JAB: jA~'~~v~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 Y-13 Well File gg ~/~upervisor Production Operations RECEIVED OCT 1 6 1986 Alaska Oil & Gas Cons. Comm~ssio,~ Anchorage A un,t of the or,g,nol Standard O,I Company Founded ,n Cleveland, Oh,o ,n 1870 ,,- STATE OF ALASKA ,~ CC~~ AL~' )IL AND GAS CONSERVATION ;ION REPORT OF SUNDRY WELL O'PERATIONS I Operations performed. Operahon shutdown '- AIterCas~ng _- Other Stimulate ~ Plugging ~ Perforate ~ Pulltub~ng - 2 Name of Operator 5 Datum elevahon (DF or KB) STANDARD ALASKA PRODUCTTOR COMPANY KBF.. = 85.54 Feet 3 Address 6 Unit or Property name P.O. B~X 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4 Locahon of well at surface 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM At top of productwe ~nterval (top Ivishak/Sadlerochit) 791' SNL, 424' EWL, Sec. 33, TllN, R13E, UPM At effective depth 623' SNL, 159' EWL, Sec. 33, TllN, R13E, UPM At total depth 613. SNL. 145' ]EWT.: .q~n. qq: rPlllq~ 1~1"4~ ]']'DM 11 Present well condition summary Total depth 7 Well number Y-13 (11-33-11-13) PBU 8 Approval number R/A 9 APl number 50-- 029-20634 measured 11290 feet Plugs (measured) true vertical 9652 feet BKB 10. Pool Prudhoe Oil Pool Effechve depth measured 11240 feet Junk (measured) true vertical 9605 feet BKB 12 Casing Length S~ze Structural -- Conductor 59 ' 20 "x30" Surface 2629' 13 3/8" Intermediate 10306 ' 9 5/8" Production -- L~ner 1437 ' 7" Perforation depth measured 10508' - 10606' Cemented 8 cu. yds. 3790 c.f. 1335 c.f. 359 c.f. (four intervals) true vertical (subsea) 8860' - 8945' Measured depth 110' 2680' 10357' 9853'-11290' Tubing (raze, grade and measured depth) 4 1/2" L-80 to 9779' with 4 1/2" tailpipe to 9940' Packers and SSSV (type and measured depth) 9 5/8" Baker SBR/packer at 9779'; 4 1/2" SSSV at 2043' St~mulahon or cement squeeze summary See attachment Intervals treated (measured) Treatment descriphon including volumes used and final pressure True Vertical depth BKB 110' 2680 ' 8819' 8412'-9652' RECEIVED OCT 1 6 i986 Alaska 0il & Gas Cons. Commission Anchorage 13. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Camng Pressure Tubing Pressure Prior to well operation Subsequent to operation 1330 881 517 0 194 1280 774 506 971 / 193 14 Attachments Daily Report of Well Operahons [] Copies of Logs and Surveys Run [] 15 I hereby certify that the foregoing is true and correct to the best of my knowledge ~ Form lO-40~l~ev. 12-1-85 (J(,/ Title Supervisor Production Operations Date Submit ~n Duplicate Well Y-13 (11-33-11-13) PBU CTU CEMENT SQUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations and a con- firmed cement channel to the OWC in Well Y-13 was performed as detailed below. Following CTU operations, the squeezed perforations were reperforated. 1. Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi. 2. Lay in mud from PBTD to 10631' MD. 3. Pumped cement and squeezed off perforations and cement channel. 4. Contaminated cement in the wellbore then reversed out after 48 hours. 5. Rigged up Schlumberger and reperforated the following intervals using 2 7/8" Hyperdome guns at 4 spf: 10508' - 10528' MD (8860' - 8877' TVDss) 10538' - 10554' MD (8886' - 8900' TVDss) 10558' - 10566' MD (8903' - 8910' TVDss) 10576' - 10606' MD (8919' - 8945' TVDss) 6. Put well back on production and tested. The above work was completed on September 14, 1986. jm 9/15/86 RECEIVED OCT 1 6 L085 AI~.cka Oi~ & Gas Cons. Commks[e~ Standard P~oduchon Comp~ 900 Eost ~n~on PO Bo~ 196612 Anchoroge. Alad~o 99~19-6612 (907~ 564 ~)11 INDEXED ., DALLAS ARCO CHEVRON EXXON TEXACO Date: 09/22/86 lO: MOBIL TI: 77349 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: A-34A CBT , 02/08/86 #1 8700-9315 Sch 5" B-3A CET 02/15/86 #2 8900-9740 Sch 5" 'P'"B-30 GCT 03/28/86 #1 15.2-10170 Sch 5" D-27 GCT 03/15/86 #1 20-9593 Sch 5" H-7 CET 02/23/86 #1 9900-10966 Sch 5" ~M-2 EPL 02/11/86 #1 9700-10342 Sch 5" '~M-7 EPL 02/27/86 #1 9250-9770 Sch 5" M-19 EPL 02/04/86 #1 9950-10592 Sch 5" N-8 EPL 01/28/86 #2 9950-9968 Sch 5" "~N-8 EPL 02/09/86 #3 9550-9969 Sch 5" '"-N-8 EPL 02/19/86 #4 9550-9970 Sch 5" '"~R-15 EPL 02/02/86 #1 8500-9438 Sch 5" ~R-20 EPL 01/20/86 #4 11300-11900 Sch ~' ~S-ll EPL 01/26/86 #1 9150-9650 Sch 5" ?~Y-10 EPL 02/12/86 #1 9050-9776 Sch 5" ~Y-13 EPL 02/26/86 #1 10250-10800 Sch 5" L.~]:J.) ~ ~ ri r LR2-1 T ~oNAcldoNTiRd~~e Da ~ Oil & ~la6 ~¢t~ , ............. We I I Records LR2- I SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON EXXON 31 ! 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE Ig071 265-0000 MAIL. POUCH 6-61 2 ANCHORAGE. ALASKA 99502 ~o DAL/UNIT/STATE: (-.Marathon) TEXACO Date: 2-14-86 MOBIL 76880 T~: PHILLIPS STATE OF AK BPAE GgOSCIENCES REFERENCE: SOHIO CASED HOLE FINAL LOGS The follow,ng material is being submitted herew,th. Please acknowledge race,pt by signing a copy of this letter and returning it to this office:-- A-3 A-L7 A-27 D-13 G-3 Y-L3 InJ. Profile-Spinner #1 InJ. Profile-Spinner InJ. Profile-Spinner Production Spinner #1 Temp Survey # 1 Pump-in Temp Survey #1 1-31-86 11420-11960 Camco 5" 2-02-86 9000-10270 Camco 5" 2-03-86 8700-9200 Camco 5" 1-28-86 11000-11300 Camco 5" 2-10-86 2000-9297. Camco 5" 2-08-86 10200-10800 Camco 5" ~~ Cathy Perkins LR 2-! ~ ~:ii~.. ~ ~" ~~ L ~co~s LR2-1 ,s --TECHNICAL DOCUMENTATION ( r SOHIO ALASKA PETROLEUM COMPANY January 28, 1986 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P O BOX 6612 ANCHORAGE, ALASKA 99502-0612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well Y-13 (11-33-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to perform a coiled tubing cement squeeze of this well. Yours very truly, JAB: JAM .. A. Bragg u pervisor Production Operations Enclosures (3) cc: Drilling Well File (MB12-1) Well Records (LR2-1) Y-13 Well File RECEIVED STATE OF ALASKA f ~', ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL I~ OTHER [] 2 Name of Operator 7 Permit No Sohio Alaska Petroleum Company 81-112 3 Address 8 APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50~29-20634 4 Location of Well At surface: 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM 5. Elevation ,n feet (indicate KS, DF, etc.) __KBE = 85.54' AMSL12 Lease Designation and Serial No. ADL 28287 9 Unit or Lease Name Prudhoe Bay Unit 10. Well Number Y-13 (11-33-11-13) PBU 1 1. F,eld and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF. (Submit in Tnphcate) (Submit in Duplicate) Perforate ["] Alter Casing [] Perforations r'] Altering Casing [] St,mulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made i--I Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) A coiled tubing cement squeeze of existing perforations and a confirmed cement channel to the OWC in Well Y-13 is proposed. After CTU operations, the squeezed perforations will be reperforated. The work is outlined as follows: 1. Lay in mud from PBTD to 10631'MD. 2. Pump cement and squeeze off perforations and cement channel. 3. Contaminate cement in the wellbore. 4. Reverse out contaminated cement after 48 hours. 5. Reperforate the following intervals at 4 spf: 10508' - 10528' MD 10538' - 10554' MD 10558' - 10566' MD 10576' - 10606' MD 6. Put well back on production and test. RECEi' This work is scheduled to commence February 10, 1986. JAN 3 0 1986 Oil & Gas Cons. Commission Anchorage 14 I hereby certify that the foregoing is true and correct to the best of my knowledge S,gned ~/~44~-~~ T,tleSupervisor Production Operation~ate The spac~ow for Comm,sslon ~s~ J. A. Bragg Cond,t,~ of Approv,,, '[ ~--JV Approved Copy Approved by, COMMISSIONER By Order of ~he Commission Date Form 10-403 Rev 7-1-80 Subm~! "Intentions" ~n Triplicate and "Subsequent Reports" ~n E)upl,cate INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON To SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE{907) 265-OO00 MAIL POUCH 6-612 ANCHORAGE, ALASKA99502 Date: 1-08-86 T#: 76682 REFERENCE SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by sigmng a copy of this letter and returning it to this office:-- ~£-!-~2't-~ 12-21-85 Static Gradient Camco ~7. A~J-i4 12-23-85 Static Gradient Camco C-20 12-21-85 Static Gradient Camco ,'B-24 12-22-85 Static Gradient Camco /H-6 12-25-85 Static Gradient Camco .M-5 12-18-85 Static Gradient Camco ?M-16 12-19-85 Static Gradient Camco M-21 12-20-85 - Static Gradient Camco zR-10 12-15-85 Static Gradient Camco R-10 12-15-85 Static Gradient Camco /R-13 12-18-85 Static Gradient Camco ,-R-19 12-17-85 Static Gradient Camco iX-2 12-20-85 Static Gradient Camco fY-12 12-25-85 Static Gradient Camco i~Y-13 12-24-85 Static Gradient Camco RECEIVED DATE 1 9 Cathy Perkins LR 2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY ,o SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only)_ 311 1 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 9/2o/~ 74730 CC#: REFERENCE ~HIO CASED HOLE_ FINAL LOGS /~he following material ~s being submitted herewith. Please acknowledge receipt by s~gmng a copy of this letter and returning ~t to th~s office.-- SFO/UNIT/STATE: 5" #1 E-4 Spinner 9/3/83 9500-9870 Otis 5" X-7 Cont. Flow Survey 7/24/83 10700-11000 GO #1 A=18 DFT 7/27/83 9900-10400 GO 5" f~l Y-13 DFT 7/26/83 10100-10900 GO 5" ~1 (4/82) RECEIVED DATE ......... g~-f.;~%"~,~--~- Victoria Aldridge TP1-5 Development Geology ___ _~9 __ Well Records SOHIO ALAS( PETROLEUM 3111 C. ANCI*ORAGE. ALASKA SFO ARCO I£LEPHONE 1907! 265 OOOO Mn, IL r'OUCl~ G 612 ANCHORAGE. ALASKA 995,02 EXXON Date: 1-12-83 lo P/~J~~S Trans. ft: 3006 (' ----- --'-'"x cc/i: 56006 ._ CENTRAL FILES (CC#='?-Tran_$_mit~al_Qn~y~ , ~ ' ' ' '' ' " '2 --' ~ /' .E~E . '~ --- ,\ , copy of this letter and returning il to thru othce:-- / ! 11/27/82 #4 65165 ~ [~] ~-10 C~ TDT 9/1~/82 #1 65626 ~ ~ ~S-Z3 CH C~D 10/11/82 //Z 657Z4 q ~ ~ t-z3 c. tgT 9/z2/8~ #z 65607 ~ ~ ' 12/1Z/82 #~ 66205 repl - DIL/BHC/FDC/CNL 10/2/82 #2 65651 5/25/8Z #1&2 65151 ment tape) -*~ A-26 OH ~ N-6 CH _ F-~3 CH / c-lo cH _Tape Pos. 0Z106 02107 02108 02109 02110 02111 O2112 02113 DIL/BHC/FDC/CNL 9/10/82 #1&2 65612 02114 CNL 10/14/82 #10 66075 02115 CNL/GR~~C4~4 ~, 11/19182 #7 66126 02116 CNL/GR~Q~¢& ~'ol~. 11/26/82 #9 ~6ii5 02117 CNL 11/12/~2 #8 66072 02118 CNL/GR 11/26/82 #2 66114 02119 CNL il/17/82 R- 66133 02120 #1 66071 02121 received the Tape(s) and Listing(s) dir~,iF~,~bhe respective service co;'pany. Please confirm thig.'-' ,-~ Karen Mestas-Venn .~c~,vco . ..( ". '._. I)evelop~, ent Geology ~t ................. ~s .__ Well Records Alaska 0ii & O~s Cons. Commmslon Aritho[age SOHIO ALASI:A PF_TROLEU;'vl CO;.;:PANY SFO ARCO EXXON PHILLIPS __ CENTRAL FILES (CC(/' s-Transmit.tal..Only. 311 i C ST",[ET A[WCt~Ot'IAGE. ALASKA 'I'ELEPHONE [907) 265-0000 MAIL POUCH 6 612 ANCHORAGE. ALASKA 99502 Date: 1-12-83 Trans.tt: 3006 c~#: 56006 REFERENCE. /The ~SOHI~O _MAGNETIC LIS TAPES & LISTINGS ollow,m§ material is be,n§ subm,tted herew,th. Please acknowled§e receipt by s,gning a copy of this letter and returmnB et to ~his off,ce:-- * , , ~replace- * __Tape Pos. S-7~ OH DIL/BHC/CNL/LDT/MLL 11/2/82 #1&2 66034 02106 N-2/ CH CNL 11/27/82 #4 65165 02107 E-10-' CH - -TDT 9/18/82 #1 65626 02108 S-i~ CH CNL 10/11/82 #1 65714 02109 Y-13"~M TDT 9/12/82 #1 65607 02110 F-14/ CH CNL 12/11/82 #1 66205 02111 D-8~ CH TDT 10/2/82 ~2 65651 02112 S-1Z-- OH DIL/BHC/FDC/CNL 5/25/82 #1&2 65151 02113 ment tape) A-26~OH DIL/BHC/FDC/CNL 9/10/82 #1&2 65612 02114 J-5-- CH CNL 10/14/82 #10 66075 02115 N-6~ CH CNL/GR 11/19/82 #7 66126 02116 F-3/ CH CNL/GR li/26/82 #9 66115 02117 H-7/ CH CNL 11/12/82 #8 66072 02118 G-10'-CH CNL/GR il/26/82 #2 66114 02119 D-6 / CH CNL 11/17/82 R- 66133 02120 G-7w/ CH TDT 11/11/82 #1 66071 02121 :4182) *SFO & EXXON: An Asterisk:(*) next to a listing above' means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confim~c~,v~orm_~/~~Dt} ' -, _ Karen Mestas-Venn Development Geology o~,, ....... JAN 1 /9198R Well Records Alaska 0il & Gas Cons. Commission Anchorage SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE {907! 265-0000 MAIL: POUCH 6.61:2 ANCHORAGE. ALASKA 99502 ~o. SFO/UNIT/STATE: GETTY (-Marathon) MOBIL PHILLIPS STA~g"OF~"AK ' BPAE (Transmittal Only) CENTRAL FILES(CC~' s-Transmittal Only) Date: 11/1/82 Trans. #: 2802 CCI!: 55802 REFERENCE: __/..,,~IO CA____~SE~ HO__~LE FINAL LOGS The following material is bemg submitted herewith. Please acknowledge receipt by signing a copy of this letler and returning it to th,s off,ce:-- E-17 M-15- G-18 G-3 Y-13 A-12 Spinner 9/27/82 #1 10.650-11160 Otis 5" Spinner 9/1/82 #t 9050-9300 GO 5" Spinner 9/25/82 Ill 10000-10350 GO 5" Spinner 9/23/82 ltl 8850-9230 GO 5" Spinner 9/19/82 # 1 10350-10700 GO 5" Temp. Survey 10/19/82 Ill 8800-9600 Camco 5" (4/82) RECEIVED DATE NOV 0 4 1982 .......... Victoria Aldridge A~aska 0i~ & Oas Cons. C0mmis~i0~ev elopmen t GeD logy .......................... AFK;hb?, a§9--- Well Records TP1-5 ( SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO o. CHEVRON 31 11 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907) 265-0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 TO SFO/UNIT/STATE: (-Marathon) EXXON GETTY MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES(CC#' s-Transmittal Only) Date: 10/25/82 Trans.#: 2778 CC#: 55778 REFERENCE: cySOHIO CASED HOLE_ FINAL LoGs. he following mater,al is be,ng submitted herewith. Please acknowledge receIpt by signing a opy of this letter and return,ng ~t to thIs office.-- SFO/UNIT/STATE: E-10- TDT-M 9/18/82 #1 Sch 10800~11717 5" Y-13 TDT-M 9/12/82 #1 Sch 10250~11215 5" (4~82) RECEIVED DATE Victoria Aldridge DeVelopment Geology Well RecordsTP1-5 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON to. SFO/UNIT/STATE: GETTY (-Marathon) MOBIL PHILLIPS 3111 "C" SIREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 10-20-82 2753 Trans. ~: CC~: 5575~ BPAE (Transmittal Only) CENTRAL FILES (CC~'s - Transmittal Only) .- __//__OH_IO~ FIN___~_ DAT___A_- PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- E-21--. Pressure Survey 9-22-82 Camco M-15/ Pressure Survey & BHPD 9-1-82 GO E-17/ Pressure Survey 9-4-82 GO E-18f Pressure Survey 9-17-82 GO E-17-- Pressure Survey & BHPD 9-24-82 Otis G-18-- Pressure Survey & BHPD 9-25-82 GO G-3 '~ Pressure Survey & BHPD 9-23-82 GO Y-13--' Pressure Survey & BHPD 9-20-82 GO C-10" Pressure Survey & BHPD 9-14-82 Camco Y-3" Pressure Survey 9-9~82 Camco A-5 ~ Pressure Survey & BHPD 10-8~82 GO N-Tw/ Pressure Survey & BHPD 10-11~82 Camco Pressure Survey & BHPD 10-11-82 Camco :4/82) RECEIVED .DATE 0~',~ ,~% Development Geology , _ ~ rs _ Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 C' STREET ANCHORAGE ALASKA TELEPHONE (907) 276-5111 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 September 10, 1982 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Y-13 (11-33-11-13) Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. Y~s very truly, District Field Engineer GJP:JLH:pjs Enclosures cc: J.D. Hartz Geology Well File #17 SEP 1 4 L982 A!3ska 0ii & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA ~ AND GAS CONSERVATION CfJ[",~llSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL ~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number Sohio Alaska Petroleum Company 81-112 3 Address 8 APl Number Pouch 6-612, Anchorage, Alaska 99502 50_029-20634 4 Location of well at surface 9 Umt or Lease Name 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM Prudhoe Bay Unit At Top Producing Interval, Top of Sag. R. SST. 10 Well Number 822' SNL, 482' EWL, Sec. 33, TllN, R13E, UPM Y-13 (11-33-11-13) At Total Depth 11 F~eldand Pool 613' SNL, 145' EWL, Sec. 33, TllN, R13E, UPM Prudhoe Bay 5 Elevation ~n feet (.nd~cate KB, DF, etc ) ] 6 Lease Designation and Serial No Prudhoe Oil Pool KBE = 85.54' AMSLI ADL 28287 12 Date Spudded 13 Date T D Reached 14 Date Comp, Susp or Aband 15 Water Depth, ~f offshore 116 No of Completions 7/29/81 8/15/81 8/21/81 feet MS L] one 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 D~rect~onal Survey 20 Depth where SSSV set I 21 Thickness of Permafros't l1290'MD 9652'TVD L1240'MD 9605'TVD YES[] NO• 2043 feetMD I 2056' 22 Type Electric or Other Logs Run ~.,~.~~ ~ DIL/BHCS/.~R/SP, FDC/CNL/GR/Cal, CBL/VDL/CCL/Gr, gyroscopic survey ~~" ' 7'/~)/,.~a/,:5 23 CASING, LINER AND CEMENTING RECORD j SETTING DEPTH MD CASING SIZE WT PER ET GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" x 30":[nsulated Conducto- Surface 110' 36- 8 cu.dys, concrete 13 3/8" 72# L-80 Surface 2680' 17 1/2" 3790 cu.ft. Permafrost II 9 5/8" 47# L-80 Surface 10357' 12 1/4.'" 1202 cu.ft. Class G; 133 cu. ft. Permafros- C 7" 26# L-80 9853' 11290' 8 1/2" 359 cu.ft. Class G w~/18% salt 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, s~ze and number) MD TVD SIZE DEPTH SET (MD) PACKER SET (MD) 4 1/2" 9940 9779' Prudhoe Oil Pool top: 10508' 8945' Bottom: 10606 ' 9030' 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 10508' - 10528' BKB (8945' - 8962' TVDss) 10538' - 10554' BKB (8971' - 8985' TVDss) 10558' - 10566' BKB (8988' - 8995' TVDss) 10576' - 10606' BKB (9004' - 9030' TVDss) 27 PRODUCTION TEST Date. F~rst Production Method of Operation (Flowing, gas I~ft, etc ) August 12, 1982 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST,PERIOD I~ Flow Tubing Ca,s, mg Pressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 24-HO, UR RATE 28 CORE DATA , Brief description of Iithology, porosity, fractures, apparent d~ps and presence of o~1, gas or water Submit core ch~ps None I ECE!VEI) SEP 1 4 1982 0il & 6as Cons. C0m~issi0~ Anchorage ., Form 10-407 Submit ~n duphcate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29 30 GEOLOGIC MARKERS FORMATION TESTS ,_ NAME Include ~nterval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUE VERT DEPTH GOR, and nme of each phase BKB Subsea Sag River SST. 10385' ,, 8756' Shublik 10413' 877 9' Ivishak 10506 ' 8858' 31 LIST OF ATTACHMENTS 32 I hereby t'~-~ f~i~ego~ng ~s true and correct to the best of my knowledge ~ G. J. P~.isga '~J Enfant_er INSTRUCTIONS General Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases ~n Alaska Item 1 Classification of Service Wells Gas ~njectlon, water injection, steam injection, air ~njectlon, salt water disposal, water supply for inject~on, observation, injection for in-sltu combustion Item 5 Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements given in other spaces on th~s form and ~n any attachments. Item 16 and 24 If th~s well is completed for separate production from more than one ~nterval (multiple completion), so state in item 16, and ~n item 24 show the producing intervals for only the ~nterval reported ~n item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such ~nterval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23 Attached supplemental records for this well should show the details of any multiple stage cement- ina and the location of th~ cpmpntlnc~ tr~r~l Form 10-407 ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C0M MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL [] OTHER [] 2 Name of Operator lio Alaska Petroleum Company 3 Address Pouch 6-612, Anchorage, Alaska 99502 4 Locat,on of Well At Surface: 1479' SNL, 528' WEL, Sec. 33, TllN,R13E, UPM 5 Elevation ~n feet (~ndlcate KB, DF, etc ) KBE = 85.54' AMSL 12 6 Lease Designation and Serial No ADL 28287 7 Permit No 81-112 8. APl Number 50D29-20634 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number Y-13 (11-33-11-13) 11 F~eld and Pool Prudhoe Bay Prudhoe Bay Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF (Submit m Tr~phcate) (Submit ~n Duplicate) Perforate [] Alter Casing [] Perforations ~_ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The follwoing intervals were perforated August 12, 1982, using Gearhart 3 1/8" carrier guns at 4 spf. A lubricator was installed and tested to 3000 psi on all well work. 10508' - 10528' BKB (Ref. BHCS/GR, 8/16/81) 10538' - 10554' BKB ( " ) 10558' - 10566' BKB ( " ) 10576' - 10606' BKB ( " ) An SSSV was set and tested in the ball valve nipple at 2043'. RECEIVED SEP 1 4 1982 Oil & Gas Cons. Commission ~%n£horage 14 I hereb~rtlfl~iegolng, . is true and correct to the best of my knowledge S,gned ¥/"'/~[,~ ~-l'"~O0~(~k. T~tle District Field Engineer The spac~elo~ for ~mmlss,on usc~ Conditions of AppraiSal, ~f any By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev 7-1-80 Submit "Intentions" ~n Tr~phcate and "Subsequent Reports" in Duplicate STATE OF ALASKA MONTHI Y 'AiASKA~' AND GAS CONSERVATION C_~_ llSSION ~~.~ REPORT OF DRILLING AND WORKOVER OPERATION . 1 Drdl~ng well [] Workover operation [] 2 Name of operator 7 Permit No. Sohio Alaska Petroleum Company 81-112 3 Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20634 4 Location of Well 9 Umt or Lease Name at surface Prudhoe Bay Unit 1479' SNL, 528' WEL, Sec. 33, TllN, T13E, UPM 10. Well No Y-13 (11-33-11-13) 11 F~eld and Pool Prudhoe Bay 5 Elevat,on in feet (indicate KB, DF, etc ) I 6 Lease Des,gnat,on and Serial No Prudhoe Oil Pool KBE = 85.54' AMSLI ADL 28287 For the Month of August ,19 82 12 Depth at end of month, footage drdled, f~sh~ng lobs, d~rect~onal dr~lhng problems, spud date, remarks 13 Casing or hner run and quantities of cement, results of pressurg' tests 14 Coring resume and brief description 15 Logs run and depth where run RECEIVEI) SEP 1 982 1 6 DST data, perforating data, shows of H2S, m,scellaneous data A~.ka 0ii & Gas Cons. Commission ~,nchorage See Attachment 17 ~ hereby e~r if~golng is true and correct to the best of my knowledge SIGNEy//~--~ ~'lCU~-"~J ~.~ TITLE District Field Engineer DATE ?//0/~2---~2 NOTE-- E[eport on~th~s form ~s req red for each calendar month, regardless of the status of operations, and must be fded ~n ( Od and Gas ConserVation Commms~on by the 15th of the succeeding month, unless otherwise d~rected Form 10-404 Rev 7-1-80 3h6ate w~th the Alaska Submit ~n duphcate PERFORATING DATA - Well Y-13 (11-33-11-13) August 10, 1982: Pressure tested tubing and inner annulus. August 12, 1982: Rigged up Gearhart and perforated the following intervals using 3 1/8" carrier guns at 4 spf: 10508' - 10528' BKB (Ref. BHCS/GR, 8/16/81) 10538' - 10554' BKB ( - ) 10558' - 10566' BKB ( ,, ) 10576' - 10606' BKB C " ) Put well on production. August 20, 1982.- Shut well in to prepare for static pressure survey. August 22, 1982: August 23, 1982: Ran static pressure/temperature survey at 8800' TVDss. Set and tested SSSV in ball valve nipple at 2043'. Well on production. SFO ARCO CHEVRON 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE {907) 265 0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 EXXON 9/3/82 GETTY Da t e: SFO/UNIT/STATE: (-Marathon) MOBIL Trans. #: 2603 PHILLIPS CC#: 55603 STATE BPAE (Transmittal Only) .. CENTRAL FILES (CC#'s - Transmittal Only) REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA yihe following material is being submitted herewith. Please acknowledge receipt by signing a opy of this letter and returning it to this office:-- A-9 ~//Pressure Survey & BHPD A-14~' Pzessure Survey & BHPD m-14,o~/ " " A-19 -- " " M_17~/ ,, ,, R-8~ " " X-9 " " " " '/ " " Otis 8/13/82 Otis 8/7/82 Otis 8/27/82 Camco 8/16/82 Camco 8/16/82 Camco 8/17/82 Otis 8/15/82 GO 8/22/82 /82) RECEIVED DATE 19 Gas Cons. t~nch0~ag0 Victoria Aldr~dg~ Development Geology Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY 3111 C STREET ANCHORAGE ALASKA TELEPHONE t907) 276 5111 MAIL POUCH6612 ANCHORAGE ALASKA 99502 July 1~, 1982 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton WELLS R-8, Y-10, Y-13, A-15, A-18, A-19, E-10, E-15, E-17, E-18, E-20, E-21, G-18, M-15, M-16, M-17 Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. This contains our proposal to perforate the wellsf~ ('"- ~is~ict~~ld Engineer GJP:JLH:ybr Enclosures cc: J.D. Hartz Geology Well File #17 I?ECEIV D d UL z 2/98Z {~ STATE OF ALASKA O~' ALASKA ,L AND GAS CONSERVATION C ,,MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL ~X COMPLETED WELL F-I OTHER [] 2 Name of Operator 7 Permit No Sohio Alaska Petroleum Company 81-112 3 Address 8 APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20634 4 Location of Well At surface: 1479' SNL, 528' WEL, Sec. 5 Elevation in feet (indicate KB, DF, etc ) KBE = 85.54' AMSL 33, TllN, R13E, UPM 12 Lease Designation and Semal No ADL 28287 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number ¥-13 (11-33-11-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF. (Submit m Tmpl~cate) (Submit m Duplmate) Perforate ~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [~] Repmr Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Descmbe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following intervals will be perforated during July/August 1982 using Gearhart 3 1/8" carrier guns at 4 spf. A lubricator will be installed and tested to 3500 psi on all well work. 10508' - 10528' BKB (Ref. BHCS/GR, 8/16/81) 10538' - 10554' BKB (Ref. BHCS/GR, 8/16/81) 10558' - 10566' BKB (Ref. BHCS/GR, 8/16/81) 10576' - 10606' BKB (Ref. BHCS/GR, 8/16/81) An SSSV will be set and tested in the ball valve nipple ca. 2000'. Subsequent Work Reported on Form No. ~ Dated _~_,/~~ JUL. S,gned ~ '~'~'~.~J M[,.~ T,deDistrict Field Engineer · n ,... ,_., ~ r.,.,f_3 Date Conditions of Approval, ~f any ORIS l:i,~L SIGNED BY LIiHHIE C. SMIT]t Approved by COMMISSIONER Approved .~opy Returned By~raer ot the Commission Date Form 10~403 Rev 7-1~80 Subm,t "Intentions" ir~ Triplicate and "Subsequent Reports" ~n Duplicate SOHIO ALASKA PETROLEUM COMPANY September 18, 1981 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 Alaska Oil & Gas Conservation Con~nission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well Y-13 (11-33-11-13) Enclosed, in duplicate, is Form 10-407, Completion Report, for the above-named well together with the Well History, Well Logs, and Directional Surveys. This well has been suspended pending perforating operations. RHR:ja Enclosures cc: Well File #17 Yours very truly, R. H. Reiley District Drilling Engineer · ~ STATE OF ALASKA WELL COMPLETION OR RECOMPLETION REPORT AND 1 Status of Well Classification of Serwce Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number Sohio Alaska Petroleum Company 81-112 3 Address 8 APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20634 4 Location of well at surface 9 Umt or Lease Name 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM ~?.O.~N$~ Prudhoe Bav Unit At Top Produc,ng Interval top of Sag R. SST.I~ 1° Well Number - 822' SNL, 482' EWL, Sec. 33, TllN, R13E, UPM Y-13 (11-33-11-13) At Total Depth 11 F~eld and Pool 613' SNL, 145' ~TL, Sec. 33, TllN, R13E, UPM Prudhoe Bay 5 Elevation in feet (Indicate KB, DF, etc ) 6 Lease Designation and Ser,al No Prudhoe Oil Pool KBE = 85.54 ' AMSL ADL 28287 12 Date Spudded 13 DateTD Reached 14 Date Comp,Susp orAband I 15 Water Depth, if offshore 116 No of Completions 7/29/81 8/15/81 8/21/81I feet MSLI one 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 D~rect~onal Survey I 20 Depth where SSSV set 21 Thickness of Permafrost l1290'MD 9652'TVD l1240'MD 9605'TVD YES~ NO[]I 2043 feetMD 2056' 22 Type Electric or Other Logs Run DIL/BHCS/GR/SP, FDC/CNL/GR/Cal, CBL/VDL/CCL/Gr, gyroscopic survey 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT PER ET GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 20"x30" Insulate~ Conducto.' Surface 110 ' 36" 8 ~.u.vd.~. ~-~ncrete 13 3/8" 72# L-80 Surface 2680' 17 1/2" 3790 ~u.ft. Permafrcst 9 5/8" 47# L-80 Surface 10357' 12 ]/4" 1202 cu.ft. Class 133 cu. ft. Permafr¢ st C 7" 26# L-80 9853' 11290' 8 1/2" 359 cu. ft. C]a.~s , 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4 1/2" 9940' 9779' None 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 27 PRODUCTION TEST Date ,F~rst Production Method of Operation (Flowing, gas I~ft, etc ) , Date of Test Hours Tested PRODUCTION FOR el L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow T,ubmg Casing Pressure CALCULATED.1~ OIL-BBL GAS-MCF wATER-BBL OIL GRAVITY-APl (corr) Press 24-HOUR BATE "IF 28 CORE DATA Brief descr,pt,on of I,thotogy. poros,ty, fractures, apparent d,ps and presence of o,I. gas or water Subm,t core ch,ps None Form 10-407 , Submit ~n duplicate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29 30 GEOLOGIC MARKERS FORMATION TESTS NAME Include ~nterval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUE VERT DEPTH GOR, and tlme of each phase BKB Subsea Sag River SST. 10385' 8756' Shublik 10413 ' 8779' Ivishak 10506' 8858' 31 LIST OF ATTACHMENTS Well History, Well Logs, Directional Surveys -- 32 I hereby certIfy that the foregoing ~s true and correct to the best of my knowledge S,gned ~.~.,~' ~ ~/"/~/~ T,tle District Drilling Date ;--/~'"'// IG R.H.-Reil/ey Enaineer INSTRUCTIONS General Th~s form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1 Classification of Service Wells. Gas injection, water injection, steam injection, air injection, salt water d~sposal, water supply for ~nject~on, observation, ~nject~on for ~n-s~tu combustion Item 5 Indicate which elevation is used as reference (where not otherwise shown) for depth measurements g~ven in other spaces on this form and ~n any attachments. Item 16 and 24 If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such ~nterval. Item 21 Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23 Attached supplemental records for th~s well should show the details of any multiple stage cement- inq and the location of the cCmentin.q too~ Form 10-407 W~.T. Y-13 (11-33-11-13) WELT, HISTORY Spudded well at 2300 hours, July 29, 1981. Drilled 17 1/2" hole to 2700'. Ran 69 jts. 13 3/8" 72# L-80 Buttress casing to 2680'. Cemented with 3790 cu.ft. Permafrost II cement. Installed and tested BOPE. Drilled out to 2745', ran leak-off test to 0.64 psi/ft, gradient. Directionally drilled 12 1/4" hole to 10363'. Ran 272 jts. 9 5/8" 47# L-80 Buttress casing to 10357'. Cemented in two stages: First stage with 1202 cu.ft. Class G cement; second stage through D.V. packer at 2608' with 133 cu. ft. Permafrost C cement preceded by Arctic Pack. Cleaned out to 10278'; tested casing to 3000 psi, okay. Cleaned out float equipment and directionally drilled 8 1/2" hole to 11290'. Ran open hole logs. Ran 34 jts. 7" 26# L-80 IJ4S liner to 11290'. Cemented with 359 cu. ft. Class G cement with 18% salt. Cleaned out to 11240', tested casing to 3000 psi, okay. Changed well over to NaCl; ran CBL. Ran 237 jts. 4 1/2" 12.6# L-80 A/B mod. Buttress IPC tubing to 9940'. Landed tubing with ball valve at 2043'. Installed and tested tree. Displaced tubing to diesel; set packer at 9779'. Tested tubing to 3500 psi, okay. Released rig at 1200 hours, August 21, 1981. SOHIO ALASKA PETROLEUM .--WELL N 0".' -Y-2-1'3 ' SEC 33~ ' T 11~-3~ PRUDHOE BAY ALASKA COMPANY SPERRY-SUN WELL SURVEYING COMPANY PAGE 1' ANCHORAGE9 ALASKA DATE OF SURVEY AUGUST 299 1981 ~O-M-PlJTA'Ti"ON ...... DA'T'E ............................................ B 0 asS G~'ROSCO~'I'C'suA'v'EY ......... ": -- AUGUST 31, 1981 dOB NUMBER BOSS-16880 KELLY BUSHING ELEV. = 85.54 FT. OPERATOR'TOM MCGUIRE TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH COURSE INCLINATION DEG MIN ..... .C .Q u R s. E .............. DO G ,L.E G...i ............... .... T .0 T.A. L .............................. DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEGREES DEG/iO0 NORTH/SOUTH EAST/WEST SECTION 0 0;00 -85,54 100 100.00 14,46 200 199,99 llA.q5 400 399.99 314.45 500 499.99 600 599.-'~'9 700 699~99 61~.45 800 799.98 1000 999.98 914,44 1100 1099,98 1014,44 1-'2-0~ ..... 1199,97 ...... 1300 1299.97 1214,43 1~00 1399.97 1314.43 1'5'o0 .... i~9'.96 ..... ~4'f'fi'~42 1600 1599.96 1514.~2 1700 1699.95 1614.41 1PO'O I799L;95 ........ 1714~i 1900 1899.9~ 1814.40 2000 1999,96 191~,40 2100 2099.94 2014.40 2200 2199.93 211~.39 2300 2299.93 2214.39 · 2400 '' 2399'92 ' ' 23'14'38 2500 2~99.92 2414.38 2600 2599.91 2514,37 2700 2699,91 2614.37 2800 2799.90 2714.36 2900 2899.79 2814.25 300-~ 2999.~8 0 ......0 .... N O'-"O-E 0"00 0'00 0.00 0,00 0 31 N 75.89 W -52 ,11 N 0 29 S 87.10 W .15 .20 N 1,~1 W 1.3~ 0 ........ ~} ......... N ..... B'5,'60 ..... W .2'i .......................... i:'""'2i"'N i','99 ..... W ......................... 1~99 0 11 N 41.70 W .20 .36 N 2.35 W 2.37 0 7 S 16.19 W .28 .37 N 2.~9 W 2.52 0'' '7 ...... N'73,50' W .1'8 ,30 N 2'63 W 2,64 0 55 N 3~.70 E .64 .75 N 2,45 W 2.54 N 1,91 W 2.12 N 1'~'5'1 ...... W ............... ii'84 N 1,09 W 1.54 N ,71 ~ 1.27 N .~9'~W l"Og N ,18 W N ,0~ W ,91 N .i7 ..... E .......... N .27 ~ .95 N .57 E .85 N ,90"E ,69- · 30 N 1,03 E .49 ' N 1.18 E N N · 03 9,57 N · 17 ....... 9'§5 N · 10 8,49 N · 05 8.04 N 0 21 N 53.59 ~ .28 ........... :?? .......... 1,2';6 0'---'2-9 .......... N .... 2'0"89'"E ............ "2'7 ....... 1".'~94 .... 0 22 N 53.70 E 0 27 N 15.89 E O- '- "1"8' ' 'N 50"50 'E 0 18 N O. 0 E 0 31 N 20.60 E 'O---'Z9 ........ N" '4', 8'0"' E 0 ~7 N 7. 9 E 0 37 N 24.70 E 0 ....26 "N'"16,20- E 0 42 N 2-20 E 0 16 N 32.20 E .... b----~'O S 61.19 E 0 37 S 65.39 E 0 37 S 68. 9 E 0 30 S 57,30 E 0 30 S 62.69 E · 27 2.53 · 28 3.12 .27 · 26 4.11 · 26 4.79 · '1'4 ........................ · 14 6.62 · 19 7.65 · 20 8"5I" 9.50 10.32 ....... 1'o,'~8 ..... 10.00 .42 .29 1.57 E .38 2.33 E -.44 3.33 E -1.50 4'24-'E -2.50 5.03 E -3.38 5.80 E -4.21 0 '17 S 48.19 E .24 7,67 N 6,38 5 -4,86 1 15 N 79.29 W 1.51 7.70 N 5,50 E -3.98 3 50 N 81.20 W 2.60 8.42 N 1.11 E 6 1~ N 8~,70'W 2,43 9,44"N 7'6~' W 9,25 L_ ?Hio ALASKA PETROLEUM COMPANY WELL NO. 'Y.13 s'EC33'4YiTN-,R13E PRUDHOE BAY ALASKA ANCHORAGE, ALASKA DATE OF SURVEY AUGUST 29, 1981 CO-~yPU.TA.¥i. ON.-DA.iE ................. : ............................................................... UU~ ~YKU~UUFIU ~UKVCT AUGUST 31, 1981 dOB NUMBER 80SS-16880 KELLY BUSHING ELEV. = 85.54 FT. U~K'ATOR-iUM-MCGuI~--£ PA'GE -'2~----m I TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL LlVf~-A-f]J'R-E-D~--V~RT'IC-A'L VE'RT'i63~C[----I~CL~N'ATiON"'D'iREE'I'ZO'N ...... S~'VE~i'iY ......~E~fA'NGOLAR ..... 600RD~'ATE$ .......... VERTz%AE DEPTH DEPTH DEPTH DE6 MIN DEGREES DEG/lOO NORTH/SOUTH EAST/WEST SECTION 3 I-O-d 3200 3300 I-- 3qO0 3500 3600 3700 3800 3900 ' 3'0'98; ~6 ...... 3197.14 3111.60 3295.03 3209.49 3'3'92';~"~ ...... 3'30'~;70 3488.79 3403,25 358q.50 3498.96 3772k09 3686.55 3863,53 3777,79 4000 3952.8,+ 38~-7';30 4100 AOAO.79 3955.25 ~200 ~+126.5q A041.00 11 0 S 83.79 W 2.91 8.88 N 12 31 S 81.89 W 1.56 6.32 N yi+ ...... ~3 ........... S .... 8'2','2~ ..... W ..................... 2",'0'5 .............................. '""-~'"'1'i .... N 15 36 S 82. 0 W 1,05 .q4 S 18 0 S 82.29 W 2.~+0 q.38 S --20 2------~z;.-2r9 w 2, ~ ~ 8;1 s s 22 52 S 82.60 W 2.90 12.36 S 25 26 S 82.39 W 2,57 17.70 S 27---'28 ............ S 82", 8'9 .... W .................. 2"';"'0'4 ............................... Z' 5',' 4 U' "S ..... 29 21 S 82.50 W 1.89 29.AA S 32 32 S 82.10 W 3.21 36.3q S 2O',2ew .... 2A-.--rE''" ' i 56,96 W 37.97 57,19 W 57.37 I 106,13 W 10A,22 13~.75 W 131,63 i'6T$1z"~ 162,7J -- 20~,$~ ~ 197.66 2~,01 ~ 236.5~ 288';1'~ .... W ................ Z'781,90'-~ 335.37 W 32~,16 386,33 W 372.96 ' ' 4'~dO 44.00 4500 ~600 ~700 4800 ~+900 5000 5100 .... 4209.36 .... ~I-2~,82'-------35~'~S--8'i~;70"w ..... j,ub .......... ~.2~ S ...... ,~i-.~8-w' ~289,10 ~203,56 38 37 S 81,60 ~ 3,04. 53.01S 501,47 W ~365.75 4280.21 ~1 16 S 81.70 W 2.65 62.33 S 565.00 ~ 4~39.82 q35~.28 43 7 S 81.70~ 1.85 .................... 7'2'"'0'3 .... S ........ 63'1"~'7"W 4513.77 4428.23 41 28 S 8~,10 W 2.31 80.36 S 698,2~ W 4589,85 ~504.31 39 29 S 90. 0 w ~.31 83.77 S 763.01 W 4667.60 4582,06 38 29 N ~"8"~-2-.1~' ~ 3'84 80'.57 S 825.78"W ~7q6.22 4660.68 37 50 N 80.20 W 2,50 72.15 S 886.96 W A82q.82 4739.28 38 32 N 80. 0 W .71 ' 61.52 S 9~7,86 W ......... ~26.'00 m-- ~B3,0q ~ 5~3.76 671.37~'m~ 73q.39 796'.68 858.36 920.18 --5200 4902.56-- 5300 5AO0 39'---'2-4~--{~-0 ]--2- 0 ....W ............ ,88 ....................... ~'D"','? 1'" $ ....... 3.-'0 '0'9' 82 ' 'W ............ ~8~'. 0'7 ...... 4979.39 4893.85 40 10 N 80.29 W .76 39.87 S 5055.58 fl970.04 qO 3~ N 80.20 W .~1 28.90 S 5131.15 5045,61 A1 1~ " N 80.'20 W ............. '69 .... f7'.75 'S 5205.69 5120.15 42 20 N 5278,76 5193.22 43 aA N 55O0 5600 5700 5800 5350.~9 526q.95 5900 5q21.14 5335.60 6000 5490.98 5~05.44 6100 5560.01 5~4.~7 q4 35 N 45 30 N q5 54 N 46 ~7 N 80.39 W 1,10 6.52 $ 80.60 W 1.~0 ~.7q N 80=,=~_.,~ .................. ,8'5 .................. 1'6"~"12 .... N 80.70 W .92 27.62 N 80.79 U .~0 39.12 N 1072.90 W 10q7.06 1136.73 W 1111.82 .... 12'01,27 W ..... 1177',~1 - - 1 1266.97 W 12~3.96 133~.29 W 1312.20 ..... t ........... 1.~.03,AO3...W ................ i'3'8'1;'85 1~72.86 w 1~52.60 15A3.50 W 1524.16 161~'.91'W' - '1596.q8 SOHIO ALASKA WELL NO. Y-13 PRUDHOE BAY ALASKA PETROLEUM SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE~ ALASKA COMPANY ............................ DATE OF SURVEY MEASURED DEPTH PAGE AUGUST.29.9..1.981 85.54 FT. COMPUTATION DATE ROSS GYROSCOPIC SURVEY AUGUST 31, 1981 dOB NUMBER BOSS-16880 KELLY BUSHING ELEV. = SEC53~TllN,R15E TR_UE SUB-SEA OPERATOR-TOM MCGUIRE COUR~S_E~ COURSE __,D__O.G_.-__L,E,,G ....... TOT AL VERTICAL DEPTH VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES DEPTH DEG MIN OEGREES DEG/IO0 NORTH/SOUTH EAST/WEST VERTICAL SECTION 6200 5628.17 5542,63 47 16 N 80,70 W .48 ' 62,58 N 1687,12 ~ L 6300 6400. 5695,64 5762,42 5610,10 47 51 5676,88 48 20 6500 6(:,00 6700 5828.84 5895.55 5962.98 5743.50 48 24 5810.01 47 56 5877.44 67 17 6800 6900 7000 6031,18 6100~13 6169.94 5945,64 46 41 6014,59 46 7 6084,40 45 18 N 80,50 W ,61 74,63 N 1759,93 W N..8.0m.60 .... ~ ....................... ,.50 .......... ~ ........... 86,.85 .... N. 1833,35 W N 80,20 W .50 99,32 N 1907,06 W N 80.20 U .69 112.00 N 1980.67 U N 80, 0 W ,63 12_4,.6,?.N . 2.0_53,22__~ N 80, 0 W ,61 137,39 N 2125,23 W N 80.10 W .56 149.91 N 2196.57 W 1659.63'""~ 1743,42 1817,84 1892,58 1967,06 2114,03 2186.45 7100 7200 7500 7400 7500 7600 77OO 7800 7900 6240,54 6512,15 6584.97 .72 .00 ,61 6155.00 44 52 6226,61 43 AO 6299,43 42 50 42 7 41 56 41 12 40 33 40 3 6458 6533 6607 .49 657~,18 6467,46 6522.07 N 79,89. W. 8000 8100 8200 8300 8400 8500 6682 $758 6854 6597.10 6672.70 6748.95 6911,50 6989.08 7067.18 6825.9,6 39 12 6903,54 39 2 6981,64 38 13 ............ 16.2,.,3~ .... N ............. 2._8.~7_,_08,..,W ...........2.2~&~0.¢ 174.70 N 2356.81 W 2328.86 187.00 N 2405.52 ~ 2398.66 199.13 N. 2472,96_~4 ........ 2~$7m~8 211-03 N 2534,71 222.95 N 2601,66 234,68 N 2668,24 8600 8700 8800 8900 9000 9100 7146,31 7226.12 7306.60 7060.77 37 9 7140,58 36 57 7221.06 35 50 246.33 258.03 269,69 N · 74 350.10 N .77 ~ 362.07 N · 45 ................. 37~..2,9 .....N .34 387.09 N · 27 4O0.25 N .76 413.61N 9200 N 80. 0 W N 79.70 W 1.22 N 79.89 N 79,79 W .72 N 79,70 g ,19 N 80., .....0 ..... W ...................... ,.43 N 79.70 W .40 N 79,70 W ,65 N 79,89 W .52 7388,00 7470,11 7552.62 7635.01 7717.33 7799.34 7302,46 35 11 738~,57 34 25 7467.08 34 22 7549,47 34 ~0 7631,79 34 31 7713.80 35 16 N 79.60 W .87 280.84 N 79.79 W .20 292,12 N...Z. 9.Sg. W ........ .86 .... · N 78,70 W 1,16 315,00 N 79. 0 W ,26 326.65 N 78,50 W 1,16 338,23 N 77,89 W N 77.89 W 2539,43 W 2605,32 W ,21~70,8.6 ..... W 2735.94 W 2734.35 2800.34 a 2799.80'"~ 2926,?8 W 2928.28 2988,87 W 2991.38 3050,2.8 .... W ............ 3053,82 3110,30 W 3~14,96 3169,43 W 3175,21 3227.62 W 323~,55 t 7880.89 7795.35 35 26 N 76.259 W .20 427,12 N N 77,.,,.!,0 N 76.79 N 76,39 N 76.60 328~.49 W 3292,63 33~0,30 W 3349.69 ......... ~95.,~5 .... W ................... 3406.~4, ~50.$5 ~ 3505.89 W 3519.48 3561.5~ W 3576.63 3&17~80 W 363~.~3 SOHIO ALASKA PETROLEUM COMPANY SPERRY-SUN ANCHORAGE, WELL SURVEYING COMPANY ALASKA WELL NO. PRUDHOE ALASKA Y '13 BAY SEC33,TllN,R13E COMPUTATION DATE AUGUST 51, 1981 DATE OF SURVEY AUGUST BOSS GYROSCOPIC sURVEY JOB NUMBER BOSS-16880 KELLY BUSHING ELEV. : ..... OPERATOR-TOM MC~UIR5 PAGE 1981 85.54 FT. DEPTH TRUE SUB-SEA VERTICAL VERTICAL DEPTH DEPTH COURSE COURSE DOG-LEG , TOTAL I NCL ! N A 'T'~'d"N .... D i ~'E ~ '¢-i'O"N ....... $ E'VER'i'T"Y ............ A'E' ~ T A N G'U'[/~'R ..... C'O OR Oi'N'A'TE s ............... v ER TI'C'AI' DEG NIH DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 9300 9~00 9500 7962.38 7876.84 35 8043.82 7958,28 35 8125.32 8039,78 35 9600 8206.93 8121.39 35 9700 8288.35 8202.81 35 9800 8369.50 8283.96 35 24 N 76, 0 W .24 4~0'.94 N 32 N 75.79 W .19 455.08 N 16 N 75.10 W .~9 469,63 N 2 o N 73.8 9 .... ......................... '"?'0 ........ ............ .... 39 N 72.39 W .92 501.91 N 50 N 70. 0 W 1.42 520'.7~ N 3674.08"W 3692'~0 3730,37 W 3750.23 378 . 5 3808.04 ..... 3842';"1~ ..... W ............. 3'8'6'5;'6'2 3897.71 U 3923.34 3953.00 W 3981.16 9900 8451.01 8,365,47 34. 57 N 69,89 W .89 54.0.60 N 4007"'~2'"W ..... ~038.31 i 10000 8532t. 65 84~+7,11 35 35 N 68,79 W ,89 560,97 N 4061,~6 W ~+095,18 { 10100 8613.68 8528.14 36 9 N 67?3.9 .... W .............. ,,. ...... 3.9.9 ..................... ]~.8.2,.ts_3:.~N ...... ~.1._!5.82...w .................. ~;.!.52..6~ ; 65.20 W lo6Z~ 606.82 N z~170.45 W q. 210.76 10200 8693.92 8608.38 37 7 N 10300 8773.36 8687.82 37 39 N 10~00 8854.11 8768.57 34 37 N 10500 8937.96 8852..~2 31 22 N 10600 9024.25 8938.71 29 17 N 10700 9112.13 9026.59 27 ~0 N 10800 9201.16 9115.62 26 29 10900 9291.20 9205.66 25 q 11000 9382.35 9296.81 23 28 . , 62.89 W 1.49 635.40 N 4225.0~ W 4269.35 61.29 W 3.17 660.96 N 4277.17 W ~325.65 61.79 W 3'"26 6'86"92 N' '4~25~'05'~ ~377.51 60.50 W 2.18 711.27 N ~369.~9 W ~25.~8 59,50 W 1.69 735.11 N .... 5'8",'8'9 .... W ................. 1-;'2"2 ....................... 758,'~2'N ..... 56.89 W 1.66 781.51 N ~86.56 W 55.50 W 1.71 804.36 N 4520.73 W 4591.51 11100 947~+.62 9389.08 21 50 N 5'~+'50 W 1'67 '8'26'"~6 N "4552~28'W 4626.60 11150 9521.21 9~35,67 20 4~ N 5q,lO W 2.2~ , 837.03 N ~567,02 W ~6~3.05 11200 ~567.97 9a82.43 20 43 N 5~.10 W ,00 ~ 847.~1 N 11290 9652.14 9566.60 20 ~3 N"54','I"0 W . ' .......... ,'0'0 .............. 86'G""0'9 .... ~ ~581.36 W ~659.05 I "'~'6'0'7";'i'6"W ......... ~'"'~687','87 ........... HORIZONTAL DISPLACEMENT = ~687.87 FEET AT NORTH, 79 DEG. 21 MIN. WEST AT MD : 11290 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. , _S_O_H_I_O ALASKA PETROLEUM COMPANY WELL NO. Y-13 PRUDHOE BAY ALASKA SEC33,TllN,R13E SPERRY-SUN WELL SURVEYING COMPANY PAGE 5 ANCHORAGE, ALASKA ........................................................... D~.T.E OF .... SURVEY AUG.US%..29,..1981 COMPUTATION DATE AUGUST 31, 1981 JOB NUMBER BOSS-16880 KELLY BUSHING ELEV. : 85.54 FT, MEASURED · OPERATOR-TOM MCGUIRE ........ IN T.E..RPP_LA.TED__~A~.U_E_S. EO~R.~.E.y_EN. !00....0 ~F_E_ET .. OF....M. EA.S.UREO...DEP TH ..................................... TRUE SUB -SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH DEPTtt NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION ~ ' 0 0.00 -85.54 1000 2000 3000 ....... q,..,..o_.o ............ o...t, _o. ,o ............................... 0., o.0 4000 5000 6000 7000 6000 9000 10000 6169.94 6084.40 162.34 N 2267. 6911.50 6825.96 280.84 N 2926. 7717.33 7631,79 400,25 N 3505, 999.98 914.46 2.53 N 1.09 W .02 .02 1999,94 1914.40 10.32 N 1.18 E .OG 2999.38 291~.84 9,_~...~4 N 7.64 3952.8~ 3867.30 23.~0 S 288.19 47q6~22 ~660.68 72.15 S 886.96 W 253,78 206.62 5490.98 5~05.4~ 3~,12 N 1543.50 08 U 830.06 32~.03 78 U 1088.50 258.44 89 W 1282,67 194.18 8532.65 8~.11 560.97 N 4061.~6 W 1467,35 184.68 11000 9382.35 9296,81 804.36 N ~520.73 W 11290 9652.14 9566.60 866.09 N 4607.16 W THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE 1617,65 150,30 16.37.-86 20,20 DIMENSIONAL RADIUS OF CURVATURE METHOD. I SOH IO ALASKA WELL NO. Y-13 PETROLEUM COMPANY SEC33,T11N,R13E SPERRY-SUC~-~ELL SURVEYING COMPANY ANCHORAGE~ ALASKA COMPUTATION .... DATE PRUDHOE DAY ALASKA AUGUST 31, 1981 DATE OF SURVEY AUGUST JOB NUMBER BOSS-16880 KELLY BUSHING ELEV. : 0 P E R"A~'~';¥ O'M MCGU'IRE PAGE 6 29e 1981 85.5~ FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH MEASURED iDEPTH 0 TRUE SUB-SEA VERTICAL VERTICAL DEPTH DEPTH 0.00 -85.54 TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/W£S'T .... ~IFFERENCE ..... CO'R RE'C T i'ON 85 85.54 0.00 185 185.54 100.00 285 285.54 200.00 0.00 0.00 0.00 · 08 N .31 W .00 .00 · 21 N 1.18 W .01 .00 · 20 N 1.91 W .01 o00 385 385~5~ 300.00 A85 485.54 qO0.OO 585 585.5~ 500.00 685 685.54 600.00 785 78s.54 700.00 ........... ~5 ........ 8~5~.5~ ............. _~.0_0..00 985 ~85.5~ ~oo.oo · 32 N 2.32 W ,01 .4o ,~ 2.4~ u .ol ....... · ~? ..... U,, ..... ,,.,, 2,,,;,6,,0...w ..... , ............................ ,.o!, · 63 N 2.53 U .01 1.3o N 1.9~ w .o2 1.82 N 1.55 W .02 ,2.~8 N 1,17 W 1085 1085.54 1000.00 1185 1185.5~ 1100.00 1285 1285.54 1200.00 1385 1385.54 1300.00 1485 1485.54 1~00.00 1585 1585.54 1500.00 1685 1685.5~ 1600.00 1785 1785.54 1700.00 .00 oo 3.00 N ,74 W .02 3.62 N .~5 W .03 4.03 N .18 4,67 N .07 W .03 5.52 N .16 5 .03 7.51 N .50 E .05 .... 8.~1 N .87 E ,05 ,00 ,00 .00 .00 .00 .00 .00 W .03 ,00 ,00 · O0 LHIO SPERRY-SUN WELL SURVEYING COMPANY PAGE ANCHORAGE~ ALASKA ALASKA PETROLEUM COMPANY ......................................................... . .......................... DA.T.E .... OF...SURVEY.AUGUST..29.,..Ilg8.! ...... WELL NO. Y-13 SEC339TllN,R13E PRUDHOE BAY ALASKA COMPUTATION DATE AUGUST 31, 1981 dOB NUMBER BOSS-16880 KELLY BUSHING ELEV. : 85.54 FT. OPERATOR-TOM MCGUIRE MEASURED ........ I,N,T,,E.,R,P.,,O,,LATE_D__VA___L_U.E.S F.OR. EV__EjN,,,1. O.O FE.E.T.,.O.E ...... S,,U,B~S.EA. O. EP!H TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH 1885 1985 2085 2185 2285 2385 2485 2585 2685 2785 DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 1885,54 1800,00 9,32 N 1985.54 1900.00 10.26 N 2085.54 2000.00 10.42 N 2185.54 2100.00 10.07 N 1.15 E ,06 .01 1,49 E .06 .00 2.18 E .o6 2285r54 2200,00 9.63 2385.54 2300.00 9.14 2485.54 2400.00 8.55 2585.54 2500.00 S,lO 2685.54 2600.00 7.72 2785.54 2700.00 7.64 N 3.19 E .07 .01 N 4.13 E .08 .01 ..N ....................... ~..~2,,.,..~ ........................ ~....~.~.~,~,.,,. ....... .oo N 5,69 E .09 ,00 N 6,33 E .09 ,00 N 5.81 E .10 .01 2885 2885,54 280 2986 2985,54 290 3086 3085,54 300 0.00 8,28 0.00 9,30 0,00 9,93 0.00 9,10 0,00 6.62 0,00 3,35 3188 3185,54 310 3290 3285,54 320 3393 3385,54 330 N 1,99 F ,18 ,08 N 6,12 W ,54 ,36 N 18,37 W .................. ~.~.0... ,77 N 34.77 W 2.65 1.35 N 55.10 W 4.74 2.08 N 78.64 W 7.54 2.80 3~96 3fl85,54 3~0 3601 3585,54 350 3706 3685,54 360 0.00 ,31 0,00 4,43 0.00 8.40 S 105,23 S 135,09 S 169.51 W 11.0S 3.54 U ~5.55 4.47 W ................... 2!...~0 .................. 5..85 ..................... ' SOHIO ALASKA PETROLEUM COMPANY SPERRY-SUN WELL SURVEYING COMPANY WELL NO, Y-13 PRUDHOE BAY ALASKA SEC33~T11N~R13E ANCHORAGE~ ALASKA IN TE RPOLATED COMPUTATION DATE AUGUST 31~ 1981 PAGE 8 DATE OF SURVEY AUGUST 29, 1981 dOB NUMBER BOSS-16880 KELLY BUSHING ELEV. ............... 0 PER A T'O[~ -';TO-M-M C G U I R E VALUES FOR EVEN 100 'FEET OF SUB-SEA DEPTH : 85.54 FT. MEASURED OEPTH . t Il... TRUE SUB -SEA VERTICAL VERTICAL OEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TV NORTh/SOUTH EA,~ T/~'E'~'T ..... D IFFER'E D VERTICAL NCE ...... CORRECTION 3814 3785,54 3700,00 5924 3885,54 3800.00 4036 3985.54 3900.00 q151 4085,54 4000,00 4270 4185,54 4100,00 4395 ~285~54 ~200,00 4526 4385,54 4300,00 4662 4485.54 4400.00 19,10 S 254,48 W 39,06 9,97 25.50 S 305.05 W 51,31 12,26 32,90 S 361.20 W 66.25 14,93 -----41,84 S --425.21"W ......... 85.54 '"19.09 52.59 S 498,68. W 109,92 24,58 64.84 s 582.1g u .... 140.79 30.87 77.80 S ~':6~'3""'4'i ...... ~ ............ ' ........ ~'~'G'"'79 .................. 3''5''-99 4922 4585,54 6500,00 83.73 S 4685.54 4600.00 79.10 S 5049 5177 5308 5439 5572 5709 4785,54 4701:Y,00 66,93 S 4885,54 4800,00 53.09 S 4985.54 4900,00 39,00 S 5o~5.54 .......... ~'~'o'o',''oo? ...... ~ ..... ' 2~.53 s 5185.54 5100.00 s.59 s 5849 5992 6137 759.43 W 208.86 32,08 839,97 W 237.58 28.52 917,13-'~N ............ 2'6'4-;'29 ....... 996.05 W 292.44 28,1~ 1078,01 W 322-50 30,07 ....... ':.. ..... :...:.....c... ...... :., ................. .. ........ 1162.01 W 355,90 51','~0 ................................. 1248.87 W 387.20 33,30 5285.54 5200,00 5,80 N 13/+0.69 W 5385 54 5300 O0 21 77 N 1~q:;5~7,'21.' W ........ 463",74 .................... 39-'90 ........................... i 5485,54 5400,00 38.22 N 1537,96 W 5O$,65 42,90 SPERRY-SUN WELL SURVEYING COMPANY PASE 9 i SOHIO ALASKA PETROLEUM COMPANY WELL NO, PRUDHOE ALASKA Y-13 BAY SEC33eTllNeR13E ,, ANCHORAGE~ ALASKA ...................................... DA.TE .... OF..iSURVEY .... AUGUST ..... 29.,. 1981. COMPUTATION DATE AUGUST 31~ 1981 JOB NUMBER BOSS-16880 KELLY BUSHING EL[V... =...~.5/+ FT, OPERATOR-TOM MCGUIRE I_N_I_~ RBO_L_A__T E~DQ__V_A.LLLF._$__LO_R__E.V~L~. O .0 .... F.E E T..... 0 F.. S UB..-$:.:£A..:.~.. O E P.TH ...... MEASURED i~DEPTH 628/+ TRUE SUB-SEA T V~ R_T_I_C~A L .... VE_RT.I CA.L ._ R_~_~.T__A N__G_~L A OTAL R ...... C O.OJ~,D_~N ~. T E. S ..MD,.TVO ....... VERTICAL, DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION DEPTH 5685.5/+ 72.Z. 9 N 91.10 N 110.11 N 12~.9/+ N 1/+7.30 N 1G5,10 N 199.22 N 215,33 N 231.28 N 2.282.60 W 836.6/+ 63. ............. 2380.5.3 ..... W .............. 87.7..68,. .................................. ~jl.. 2~73./+7 ~ 915,23 37. 2563,30 W 950.61 35, 2651,59 W 98/+,97 3/+, 1859,00 W 6~9,25 /+9,85 1969,5q W 699,52 50,27 20~7,30 W ...7/+7.,73.., /+8.,.~ ........ 2181,62 ~ 793,ql q5.68 " 2~ 55 38 35 2/+6.78 N 2738,/+~ W 1018,.32 33,35 5600,00 6/+34 5785,5/+ 5700,00 6585 5885,5~ 5800,00 __6733 5985,5/+ 5900,00 7835 7966 6878 6085,5/+ 6000.00 7022 6185~5~ 6100,00 7163 62~5.5/+ ~~00 7300 6385,5~ 6300.00 7~36 6485.5/+ 6/+00.00 7570 6585.5/+ 6500.00 j ......7 ~'0-3------6~'~--~" 6600-. 00 j 6785.5~ 6700.00 262.21 N 6885.5~ 6800~00 277~01 N 8095 6985.5A 6900.00 291.61 N 8223 7085.5/+ 7000.00 306.05 N .83/+9 .~ 7185,5/+ 7100,00 320.81 N 8/+7~ 7285,5/+ 7200,00 335,19 N 8596 7385,5/+ 7300,00 3q9,7/+ N 8718 7q85.5/+ 7/+00,00 36/+,28 N 2823.33 W 1050,40 32.08 29 05 · 9.~.,.,,,W ........ 1,0,,8.0... 95 ..... .:.~ ................. ,,.3,0,.56 2986.0z~ W 1109.91 28.96 306/+,50 W 1137.83 27.92 3139.~3 W 1163.67 25,83 ,3212.72 W 1188, g'8 2q,81 ' 3282.79 W 12.11, ~5 22.97 ! 3,350.64 W .. i 2..~.3..,_-.1.7~. 2,1, :.,7, 2 ....................... ' ............ j L_soH I o ALASKA PETROLEUM COMPANY WELL NO. PRUDHOE ALASKA Y-13 SEC33,TllN,R13E BAY SPERRY-SUN WELL SURVEYING COMPANY ANCHORAGE, ALASKA .......................................................... pA.T.E...~.~ ...... $.U.R.~.~ ....A.J.GUsf COMPUTATION DATE AUGUST 31, 1981 JOB NUMBER BOSS=16880 KELLY BUSHING ELEV. 29~ PAGE 10 · 1981 I ........ OPER'A'TOR-TOM 'MCGUIRE ..... 85.54 FT. INTERPOLATED VALUES FO.R....E..V..._EN .... !O0...F.EE.T .... OF..$.~B-...S.,,E..,A..,,,,.,D,.Ep.~!d ...................................................................................... ; MEASURED IDEPTH TRUE SUB-SEA VERTICAL VERTICAL DEPTH DEPTH TOTAL RECTANGULAR COORDINATES N~-~-T"~--S/~'O-UTH "EA$'T/WEST 8839 7585.54 7500.00 8961 7685.54 7600.00 9083 7785.5~ 7700.00 9205 7885.54 7800.00 379.32 N 3417.39 395.11 N 348~.63 411.34 N 3552.03 427.89 N 3621.02 9328 7985?54 7900.00 444.92 N 3690.05 W 462.42 N 3759.23 W 480.87 N 3827.57 9451 8085.54 8000.00 9573 8185.54 8100.00 9696 8285.54 8200.00 9819 8385.54 8300.00 9942 8485,54 8400.00 501.30 N 524.70 N 548.91 N 10065 8585,54 8500.00 10189 8685.54 8600.00 57 ~-"----~" N 604.16 N 3895.79 ..3963.89 4030.10 4 o 9'6;-~'4 .... w q164.69 W MD-TVD VERTICAL · D1FF'E'RENCE ....... COR'RE'CT iON 1254.34 21,17 ' ,i ................. 1%~'~'" 8 7 ............... ~i-T. ~'3 ................................................. 1297.56 21,69 1320.17 22,61 1~'q'2,87 22.70 ..... 1365.72 22.85 1388,24 22.52 1411.01 1434.24 1456.60 ........... 1~79'.61 1503.95 10315 8785.54 8700.00 10437-- 8~85.54 8800.00 10555 8985.54 8900.00 10669 9085.54 9000.00 637,65 671.11 700.55 728.03 10782 9185.5~ 9100.00 10893 9285,54 9200.00 11003 9385.54 9300.00 754.q0 780.07 805.15 4233.30 429 ~'~'-, ? 8 4350.29 4398.58 4443.05' 4~84.35 4521.87 W 1529.78 i'5'5'2,37 1570.02 1584.43 ......... i5~'7.'01 ...... 1608,22 1517.94 ' 22.77 23.24 22.36 24.34 25.83 22-~59 17,65 14.41 11.21 9.73 __s. O__H_I 0 ALASKA PETROLEUM COMP/~NY WELL NO, PRUDHOE ALASKA Y-13 SEC33~TllN,R13E BAY SPERRY-SUN WELL SURVEYING COMPANY PAGE 11. .. ANCHORAGE~ ALASKA ........................... " DATE OF SURVEY ..... A..U.GUST..29..~..~.981.. ' COMPUTATION DATE AUGUST 31~ 1981 JOB NUMBER BOSS-16880 KELLY BUSHING ELEV., .: ..{)5.5~+ FT. OPERATOR-TOM MCGUIRE I N T E ,R P__O_L A.,TED v A_...L UE S F 0 R__E V. EN.. !. 0.0 .....FEE. I.. 0 F.. S UB.'.$..E k.. DER T..H ................................................... , TRUE SUB-SEA TOTAL ~MEA.___S~RED VERTI.C_~.~ ..... VERTICAL R~CTANGULAR COORDINATES MD-TV~ VERTICAL DEPTH . DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 11218 9585o5~+ 9500.00 851,31 N 4586.75 W 1633,25 7.02 11290 9652,14 9566,60 866,09 N ~+607.16 W 1637,86 4,61 THE CALCULATIO{4 PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEARESTf20 FOOT MD (FROM RADIUS OF CURVATURE) POINTS 0 oO Mr. Gary Plisga Sohio Alaska Petroleum Company 3111C. Street Anchorage, Alaska 99502 August 31, 1981 Re: Our Boss Gyroscopic Survey '~L Job No. Boss-16880 Well No. Y-13 (SEC33 TllN R13E) Prudhoe Bay Field North Slope, Alaska Date of Survey: August 29, 1981 Operator: Tom Mcguire Dear Mr. Plisga: Please find enclosed the "Original" and seventeen (17) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Yours very truly, NL SPERRY-SUN, INC. Ken Broussard District Manager KB/pr Enclosures GR[AT LAND DIR[CTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY Si0 H IA~ COMP Y-13 WELL NAME Prudhoe Bay LOCATION AL781D26 JOB NUMBER S i nfl,,! ,,e, Shot TYPE SURVEY C.D. Garner Enqineer . . _ m, ~ Ar,~~ ,1 TITLE 8/1,7/,,81 .... DATE sir, NATURE - - 28Q0 ....... -. _ 10288 ~D'E'PTH iNYERIVA[ FROM TO - "~DATES 'SU'RVE'Y~ WAS: -TAKEN ..... 7/30/81 8/!1,/81 FRO'il ' ' TO THIS IS A RECORD OF A SUB-SURFACE SURVEY · OF YOUR WELL We have retained a copy of your survey report in our files for your convenience; however, should you so desire, all copies of the surve~y report will be forwarded to you on written request. All ~urveys are locked file and are held in ~-ttictest confidence Additional copies ~r survey report can be made from the original by any blueprint company., COMPLETION REPORT FOR GLDD BY FM L INDSEY & ASSOC, SOHIO ALASKA PETROLEUM WELL Y-I3 COMPUTER METHOD(RADiUS-O~-CURVATURE) COMPUTER DATE(8-14-81) SURVEY DATE( 8-2-81 THRU. 8-6-8i) F!ELD METHODIAVERAGE) MAGNETIC SINGLE SHOT SURVEY RECORD OF SURVEY CONFIDENTIAL STATE OF ALASKA COPY TRUE NEAS, DRIFT VERTICAL -DEPTH ANGLE DEPTH D M SUB DR IFT LEA DIREC ' DEG, TOTAL COORDINATES CLOSURES DISTANCE ANGLE D M S DOG LEG SEVERITY DEG/IOOFT ..... 0 0 0 0,00 -86,00 S 0.00~ 0.00 S 0.00 W O.00 S 0 0 0 W O*O00 ASSUMED VERTICAL TO 2800, 2800 0 0 2800.00 2714.00 S O.OOW 2845 1 15 2844.99 2758,99 583.00W --290~ 2 45 2907~95- ~21,95 'S88.00W 2970 4 0 2969,8, 2883-8* N86.00W 3032 5 45 3031e62 2945,62 N82,00W 3095 7 30 309&,]9 ]008.19 3]26 8 30 312&,89 3038.89 S89,00W 3157 9 0 3255,53 3069.53 ~86.00W 3265 11 30 326i,80 - ~'~75,80 $83.00~ 3351 23 0 3345e84 ~259,84 582.00W 3445 15 0 3437e04 ~52.04 S83.00W 353? 25 30 3525,80 ~9,80 S85.00W 3629 18 0 3613.89 3527,89' $83.00W 3720 20 0 3699.93 ~613,93 3843 23 15 38~e26 3728.26 $82-00W 3965 26 0 3925e~5 ~839-25 4086 2? ~5 ~033.08 ~9~?,08 $82.00W ,2io 32 o 42~0,~? ~o~4.'~7 ss~.oow ~331 ~5 0 ~211,16 4~5.46 S8~,O0W ~53 39 0 ~8,88 ~52,88 SS~,00W 0-00 S 0.00 W 0.~3 S 0.29 W 0.50 S 2.48 W 0.44 $ 6.13 W 0.10 N 11.37 W 0.54 N 28-62 W 0.47 N 22.93 W 0.26 N 27.64 W 1,57 S 46.77 W 3.95 S 64.86 W 6.92 S 87.60 W 9.45 S 111.~7 W 12.22 $ 137.83 W 16.34 S 167.17 W 23.04 S 211.99 W 29.68 S 262.~9 W 37.29 S 316.55 W 45,88 S 377,69 W 54,02 5 ~43.97 W 62,33 5 516.~1W 70.47 S 594,41W 0.00 S 0 0 0 W 0,44 S 41 30 0 W 2.54 S 78 26 46 W 6,15 S 85 51 5 W 11.37 N 89 28 6 W 18,63 N 88 18 4~ W 22,94 N 88 49 2 W 27.64 N 89 26 42 W 46.79 S 88 4 22 W 64,98 S 86 FO 37 W 87.68 $ 85 28 15 W 111.87 S 85 9 10 W 138.~7 S 84 55 55 W 167.97 S 84 24 54 w 213.24 $ 83 47 45 W 264,06 S 8~ 32 47 W 318,74 S 8~ 16 ~2 W 380,47 S 83 4 23 W 447.25 $ 83 ] 44 W 520.65 S 83 7 26 W 598,57 S 83 14 16 W 0.000 2,779 2,381 2-017 2.823 2,788 3,226 1,630 2.317 1,745 2.129 0.565 2-725 2.213 2-645 2.260 1,49U 3,457 2-479 3.295 2.500 SEC T ! ON DISTANCE 0.00 O.OU~- 0-22 2.34 5.92 11.17 18-36 22.58 27.15.-~. 45.55 62.81 84.34 107.43 132.74 160.69 20F.~B 251.43 303.04 361,31 424.69 494,57 568,95 soHio WELL SINGLE SHOT SURVEY 14 AUG. 81 RECORD OF SURVEY TRUE D*MEAS. DRIFT 'VER~rICAL- ...... SUB D£PTH ANGLE DEPTH SEA D M DR IFT DIREC DEG. 4634 44 0 4474,72 4388.72 S84.00W 4663 43 0 /-~95e76 4409,76 S86,00W 4724 42 15 ~540,-~ ...... ~454.64 S86.00W 4755 41 0 4563,82 4477,82' S88.00W 4786 40 0 4587,39 4501,39 S89.00W 4817 39 45 - 4611;18---&~525,18 N88.00W 4847 40 0 4634,20 4548.20 N87.00W 4878 40 0 4657,95 4571.95 N86.00W 4934 39 0 4701.16 .... ~615.16 N79.00W 4963 38 0 4723.86 ~637.86 N77.00W 5105 38 30 ~835,37 4749,37 N77.00W 5258 40 0 &95~,~~867,85 N77.00W 5443 ~1 0 5094,52 ~008.52 N77.00W 5920 ~5 0 5443.31 5357-31 N76-OOW ---6223 47 30 5652,82 -5566,82 N76oOOW 6366 48 15 5748,74 5662,74 N77.00W 6575 47 15 5889,26 5803-26' N76.00W 7021 ~6 0 ~195,55 .... ~109.55 N75.00W 7198 &~ 0 6320e70 6234e70 N76.00W 7292 44 0 6388.32 6302.32 N75.00W 7513 42 0 6549.94 '%~63,94 N76.00W 7702 41 15 6691,22 6605.~2 N76.00W 8170 39 15 7048,40 6962,40 N76.00W 8643 35 15 742~.83 ~338.83 N76.00W 8860 35 0 7602.)1 7516.31 N76.00W 9172 36 0 7856,31 7770.31 N7q. OOW 9641 35 45 8236,34~--~1~0,34 N71.OOW 9828 35 0 8B88.82 6302,82 N69,00W lOOZ~ ~5 30 8§19,69 8~63,69 N66,00W TOTAL COORDINATES 74.82 S 635.78 W 76.56 S 655.66 W 79-44 S 696.87 W 80.52 S 717.43 W 81-05 S 737.56 W 80.87 S 757-43 W 80.04 S 776.64 W 78.82 S 796.53 W 74.17 S 831.83 W 70.42 S 849.48 W 50.64 S 935-14 W 28-87 S 1029-46 W 1,84 S 1146,53 W 74-08 N 1462-79 W 127.02 N 1675,14 W 151.78 N 1778.27 W 187.90 N 1928.70 W 269.06 N 2242,55 W 300-40 N 2363-71 W 316.75 N 2426.93 W 354.~8 N 2572.84 W 384-85 N 2694.65 W 458.00 N 2988.04 W 527.25 N 3265.79 W 557.46 N 3386.93 W 604.35 N 3561.93 W 686.98 N 3824.02 W 724.01 N 3925.74 W 767,~1 N ~030,77 W CLOSURES D l STANCE ANGLE D M S DOG LEG SEVERITY DEG/IOOFT 640.17 ,% 83 17 15 W 660,12 5 83 20 21 W 701.38 S 83 29 45 W 721,94 S 83 35 45 W 742,00 S 83 43 43 W 761,74 S 83 54 17 ~ 780.76 S 84 6 57 W 800.42 S 84 20 54 W 835.13 S 84 b4 15 W 852.40 $ 85 15 39 W 936e51 S 86 53 59 W 1029.87 S 88 23 36 W 1146e53 S 89 5~ 27 W 1679.95 N 85 ~9 48 W 1784.74 N 85 7 16 W 19~7.83 N 84 26 8 W ~258.63 N 83 9 29 W 2~82.72 N 82 45 25 W 2447.51 N 82 ~ 50 W 2597.15 N 82 9 ~8 W 2722.00 N 81 5Z 18 W 3022.94 N 81 ~7 7 W ~308.08 N 80 49 43 W ~432.50 N 80 99 12 W 3612.83 N 80 22 13 W 3885,24 N 79 48 55 W ~991.95 N 79 ~3 1 W ~103,20 N 79 13 8 ~ 3.279 4.710 1-230 4.896 3.490 4.038 1.610 2.073 5.263 4.327 0-352 0-980 0-541 0*845 0.825 0,653 0,544 0.303 1.162 0.739 0.927 0.397 0.427' 0.846 0.115 0.390 0-225 0,534 0,573 SECTIO~ DISTANCE 627.8. 667.66 687.60 707.23 726,75 745.76 765.50 8o1~9~l__ 819~'~-- 906.94 1003-70 1123.80 1448.81 1667.43 1773.41 2251.6 2376.64 2441.84 2592-32 2717.73 3019.78 3305.71 3430,43 3611.23 3884.45 3991.47 4103,00 .... S~)H IO WELL SINGLE SHOT SURVEY ].4 AUG, 83. RECORD OF SURVEY TRUE "-MEA$, 'DR! FT 9ERT~C-At. DEPTH ANGLE DEPTH D M SUB DR I F T SEA. DIREC D£G. TOTAL COORDINATES 10288 38 0 8760,4! 8674,41 N62,0OW 836,48 N 4172.17 W BOTTOM HOLE CLOSLJR-E 4255.19 FEET AT N 78 39 46 W CLOSURES D I STANCE ANGLE D M S DOG LEG SEVERITY DEG/3.0OFT 4255.19 N 78 39 ~6 W 1.112 SECTION DISTANCE $OHi-~) ~ELL Y-'I, 3 ~(-- SINGLE SHOT SURVEY .._MEASUR_Ep_.DEP_TH AND OTHER ~.~A FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, AUG, 81 .......... ~IEA.~URED DEP TH TRUE DEPTH SEA DIFFERENCE 186 186o 100 286 2860 200 386 3860 300 486 q86. 400 586 SS&, 500 ~86 .... 686. - 600 786 786* 700 886 8860 800 .... 986- 1086 1186 -i286 1386 lq86 1586 1686 1786 10860 1000 11860 1100 12860 1200 1386, 1300 1486. 1400 I~8-&. 15oo 1686. 1600 17860 1700 1986 1986- 1900 2086 20860 2000 2i86 ...... ~i~6--g-'- 21oo 2286 228&~ 2200 2386 23860 2300 2~86 ...... ~8~; .... 2~00 2586 2586. 2500 2686 26860 2600 2786 ........... 27860 -2700 2886 2886e 2800 2986 2986- 2900 3188 ]18&e 3100 3290 3286o 3200 3496 34860 3400 3600 3586, 3500 0 0 0 0 0 o 0 0 0 · 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 VERTICAL CORRECTION 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 TOTAL COORDINATES 0.00 $ O.OO W 0.00 5 0000 W 0.00 S 0.00 W 0.00 S 0000 W 0000 $ 0,00 W 0000 S 0-00 W 0.00 $ 0000 W 0000 S 0000 W 0000 S 0.00 W 0o00 S 0,00 W 0.00 S 0,00 W 0,00 $ 0.00 W 0000 S 0,00 W 0,00 S 0,00 W 0.00 5 0.00 W 0,00 S 0.00 W 0000 S 0000 W 0,00 5 0,00 W 0.00 S 0,00 W 0,00 $ 0000 W 0000 S 0.00 W 0.00 S 0,00 W 0,00 S 0,00 W 0.00 S 0000 W 0000 S 0,00 W 0,00 S 0,00 W 0,00 S 0,00 W 0.45 S lo53 W 0,35 S 7,31 W 0*54 N 17.56 W 0o12 S 32065 W 2,19 & 51,75 W 5,24 5 74,30 W 8.41 S 100.56 W 11,20 & 129.05 W SINGLE SHOT SURVEY MEASURED DEPTH AND OTNER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, 14 AUG, 81 TRUE MEASURED ..... V£~~ SUB MD-TVD DEPTH DEPTH SEA DIFFERENCE 3705 3686e 3600 19 3812 5786, 3700 26 - ~922 3886, 3800 35 4033 398&e 3900 4146 4086e 4000 60 4264 4[-~--6- 4100 77 &386 4286, 4200 99 451~ 4386, 4~00 128 ......... ~649 --- 4486, 4&O0 163 4784 4~8&, . 4500 198 4914 4686, 4600 5042 ............ ~786e 4700 5170 4886. 4800 5~00 4986. 4900 5~3~ .......... ~08--~. sooo 5565 5186, 5100 5701 5286, 5200 5981 5486, 5~09 6125 5586, 5500 6~7z ........... 5~6~ ....... ~6oo 6422 5786, 5700 6570 5886e 5800 6717 ..... ~9~ .... 5900 686~ 6086, 6000 7007 6186, 6100 7150 6286, 6200 7289 6~86~ 6300 7426 6486, 6~00 7561 6586e 6500 7695 6686. 7828 6786, 7~59 -- 6886. 8089 6986. 8218 7086, 228 256 283 345 379 415 453 494 539 586 636 68~ 731 777 821 864 903 94O 975 6600 1009 6700 10~2 680O 107~ 6900 1103 7000 1132 VERTICAL CORRECTION TOTAL COORDINATES 6 15,57 S 162,14 W 7 21,34 $ 200-09 W 9 27,34 S 243,86 W 11 33,67 S 292,46 W 14 41,59 S 345,31 W 17 49,~3 S &06,63 W 22 57.82 S 476,01 W 29 66.41 S 555,72. W 35 75.81 S 646,10 W v~5 81,02 S 736,27 W 30 76.31 S 819,]7 W 28 59,~ 5 897,02 W 27 ~1.k8 S 97k.8~ ~ 31 22.78 S 1055,83 W 31 3,51 S 1139,32 W 34 16,55 N 1225,39 W 36 37.86 N 1314,87 W 38 60.~9 N 1~07,86 ~ ~1 8~.56 N 150~.82 ~ 45 109,63 N 1605.40 W 47 135,67 N 1710,30 ~ 50 161,22 N 1818,73 W ~8 187.01 N 1925,13 W ~7 E13,31 N 2029,~7 W 46 239.80 N 2132,03 W ~ 266,~6 N 22)2,82 W ~ 292.1~ N 2~)0,89 W 39 ~16,17 N 2424,76 W 37 ~40.18 N 2516.25 W -35 362,24 N 2603,95 W 3~ 383.74 N 2690.18 W 33 ~04,77 N 277~,55 W 31 425,39 N 2857,23 W 29 ~65,~8 N ~017.6~ ~ --~6~i'O-wELL ¥~-1)--- /. SINGLE SHOT SURVEY b!EASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, AUG. 81 TRUE MEASURED ............... -9~-[~C'~L-SUB MD-TVD DEPTH DEPTH SEA DIFFERENCE 8346 7186e 8471 7280e 8718 8840 8962 9085 9209 9332 9456 9579 9702 9824 99~.7 10070 10194 7100 1160 7200 1185 7300 1209 7486e 7400 1232 7586, 7500 1254 778&e 7700 1299 788&, 7800 1323 7986. 7900 1346 808&, 8000 1370 8186, 8100 1393 .... ..... s2oo 1416 838&, 8300 1438 8486, 8400 1460 1483 8&~&, 8600 1508 VERTICAL CORRECTION 28 25 24 23 22 22 23 2~ 23 2~ 23 23 22 22 23 25 TOTAL COORDINATES 484,49 N 502,88 N 520,57 N 537.69 N 554.68 N 572, O0 N 590, 55 N 6~0o33 N 631,05 N 652-74 N 675°29 N 698.76 N 723.19 N 749,5~ N 778,3~ N 810.30 N 309~°29 3168.05 3238.98 3307.66 3375.80 3443.85 3512,87 3582-64 3652.00 3721o1~ 3789°69 3857°60 3923°60 3989°23 4054°7~ ~121.31 SOHIO WELL SINGLE SHOT SURVEY INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH. TRUE MEASURED ,~Ek-I'-'J[-'~-L .... SUB DEPTH DEPTH SEA 1000 lO00, 914. 2000 2000. 1914. 3000 2~9, 2913~ 4000 ~'-~; ..... S87o. 5000 4T~2~ ~666. 6000 ~9'9, 5413. ?oo0' &l~O. 6094. 8000 6917. 6~31. 9000 ?716, 76300 iooo0 ~-~i9-; ....s~3. TOTAL COORDINATES 0.00 S 0.00 W 0.00 S 0.00 W 0,24 S 8.44 W 31.64 S 277,74 W 65,29 S 871.71 W 87.84 N 1517.99 W 265-16 N 2227-95 W 431,78 N 2882.87 W 577.61N 3465,1~ W 761.66 N 4017.50 W 14 AUG. 81 HORIZONTAL VIEW SOHIO ALASKA PETROLEUM WELL Y- I$ RADIUS OF CURVATURE MASNETIC SIN(~LE SI~OT SURVEY SCALE I" = I000' AUGUST 14~ 1981 TVD = 8760' E o N 75 o , , ["'~LL' D£PTi. I~: SHowN"i Suggested form to be znsertcd in each "Actzve" well folder to dleck for tingly complzance wzth our regulatzons. O!~arator, Wel 1 Name and Number Reports and Materials to be recezved by: ~te Rc~ul red Da to Received Ro~arks Ccrrrpletion Report Yes ..... ...... · . ,, Registered Su~ey Plat / Inclination Su~ey ~ ~ F' ~, ....... Dire~ional Su~ey ~ ~ I g''' ~J ~ ~ ' - 7 e ~ ~.,,~/.~/~,i~ ~< .... Drill St~ Test Repns ~ ~' ~ ~.,. Pr~uctio~ Test Retorts ~0 f*r~S ~ ([~'~' & SOHIO ALASKA PETROLEUM COMPANY September 18, 1981 3111 C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 Alaska Oil & Gas Conservation~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well Y-13 (11-33-11-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-named well for the month of August, 1981. RHR:ja Enclosures cc: Well File #17 Yours very truly, R. H. Reiley District Drilling Engineer STATE OF ALASKA ALASK~ _AND GAS CONSERVATION C(~ MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS Drdl~ng well Workover operation [] 2 Name of operator Sohio Alaska Petroleum Company 3 Address Pouch 6-612, Anchorage, Alaska 99502 4 Location of Well at surface 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM 5 Elevation ~n feet (~nd~cate KB, DF, etc ) 6 Lease Designation and Serial No KBE = 85.54 ' AMSL ADL 28287 7 Permit No. 8 APl Number 50-029-20634 9 Umt or Lease Name Prudhoe Bav []nit 10 Well No ¥-13 (11-33-11-13) 1 1 F~eld and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of. August ,19 81 12 Depth at end of month, footage drdled, fishing jobs, dIrectional drdlmg problems, spud date, remarks Spudded well at 2300 hours, 7/29/81 Depth at month-end: 11240' PBTD Footage drilled: 8590' 13 Casing or hner run and quantities of cement, results of pressure tests See attached Well History 14 Coring resume and brief description None 15 Logs run and depth where run DIL/BHCS/GR/SP @ 11278' FDC/CNL/GR/Cal @ 11270' CBL/VDL/CCL/GR @ 11222' Gyroscopic survey @ 11240' ,1 6 DST data, perforating data, shows of H2S, m~scellaneous data $£P I 8 198I Released rig at 1200 hours, 8/21/81. Alaska Oil &eas Cons. A~c!~orage C°t~tOiSslo~ 17 I hereby certify that the foregoing ~s true and correct to the best of my knowledge IG ~~ ~ /~g~ District Drilling EngineeroATE SIGNED TITLE NOTE--Report on th~s M3~m ~s required for each calendar month, regardless of the status of operations, and must be filed in duplicate w~th the Alaska Od and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise d~rected Form 10-404 Rev 7-1-80 Submit ~n duplicate SOH ! 0 CONF ! DENT I AL SOHIO ALASKA PETROLEUM COMPANY · TO /UNIT/STATE ~ -- SFO : ........ __ _.... _ _1 i I _ -- _1 _ i I I -- ..... -- -~ . Logs Indexed~ 1 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE {907) 265-0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 9/11/81 ~ 1047 REFERENCE: SOHIO FINAL DATA OPEN HOLE ~'~he following material is being" ~ubmitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT / STATE: Y-13 Y-13 Y-13 Y-13 DIL/SFL (Sch) 8/16/81 #1 BHCS " 8/16/81 #1 FDC " 8/16/81 #1 FDC/CNL " 8/16/81 #1 2" & 5" 2" & 2" & $" 2" & $" STATE ONLY: DIRECTIONAL SURVEYS Y-13 Magnetic Single Shot Survey 7/30-8/11/81 Y-13 Gyroscopic Survey 8/29/81 #AL781D26 #16880 De/ ~e~S;~sGe°l°gy SCHLUMBE< OFFSHORE SERVICES 5000 GULF . ..,:EWAY. PO BOX 2175 HOUSTON, TEXAS 77001, (713) 928-4000 PLEASE REPLY TO 57~ RALSTON STREET - SUITE 306 VENTURA, CALIFORNIA ~ September 4, 1981 Dr. David Herndon SOHIO Petroleum Company 160 Pine Street San Francisco, Ca. 94111 Dear Dr. Herndon: Re: Job # 62120, Well Y-13, Prudhoe Bay run #1, logged 16-August-81. Enclosed are corrected LIS tapes with complete data. Previous LIS tapes, mailed 22-Aug-81 did not contain BHC-sonic data. Please disregard them. I apologize for any inconvenience or difficulties this may have caused you. Sincerely, Annemarie Nash, LDP AN/an cc: W. M. Byrd, Houston Schlumberger, Anchorage A DIVISION OF SCHLUMBERGER LIMITED *M-12 *Y-13 SOHIO ALASKA PETROLEUM COMPANY SOH I 0 COl'IF I DEIST I AL 3111 ' C' SIREET ANCHORAGE. ALASKA TELEPHONE 1907) 265 O000 MAIL. POUCH 6 61 2 ANCHORAGE, ALASKA 99502 ARCO To EXXON Date:9/14/81 ~ 1053 PHILLIPS SFO REFERENCE ~ SOHIO MAGNETIC LIS TAPES / 6z/ The following material,s being subm~ttedherew~th Please acknowledge receipt by s~gn~ng a copy of th~s letter and return,ng ~t to th~s off~ce.-- t/CORRECTED Magnetic LIS Tape & L~sting w/ letter from Schlumberger. /~ORRECTED Magnetic LIS Tape & Listing w/ letter from Schlumberger. 6/31/81 #2 #62071 8/16/81 #1 #62120 · ARCO · · ~r. z:~:xprq PHILLIPS ~~STATE ? ;..'. ;..':.,' "-.[ ';[[ :. :':~;(';:;i (9,.',7'. 2¢.I,-O000 M,'.",.: POUCH 6..612 Ar;Ci-;C;'..AGE, ALASKA 9 .9502 Date: 9/3/81 ~ 1028 REFERENCE: /SOHIO ~,LAGNETIC LIS TAPES ,~// The f ' ollowing material is being submitted herewith. Please acknowledge receipt by signing a c, opy of this letter and returning it to this office:-- . (Sch) * ]~-8 /'''' " " " " 7/28/81 f/1 t/62046 * B-6'/''''' " " " " ' 7/22/81 I;2' f/62047 * ~-14/" " " " " 7/23/81 #i&2 #62053 _ ~_~.- ,,. ,, ,, .. .... ____.,, ~/~/~8 ~,~ .... ,,~o~ ~ ~-, ~Previ~q.s._Tape.--Incorr~'~ * A-15// " " 8/12/81 #1&2 ~62116 ,* ~-~3~' " " " " 8/~6/8~ #~ ~/62120 R-10/ * " " " " 8/~7/8z #~ ~ G-12'~Magnetic LIS Tape ~ F-13g_Magnetic LIS Tape & Listing - F_10/ ,, ,, ,, ,, REPLACEMENT T, 8/5/81 #1 #-- (Dresser) 8/3/81 #- #ECC7072 " bILL 7/28/81 #-- #ECC7073 "' NLL · ~'~" '"' ' ~~r~;~£o_o.,%_.O¢¢r. msmoa Development Geology DATE __., /// '"~/,:il;,~ "/~00hOf';~19¢, Well Records HQ 4-5 SOHIO ALASKA PETROLEUM COMPANY 3111 ' C" STREET ANCHORAGE ALASKA TELEPHONE (907) 276-5111 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 August 12, 1981 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well Y-13 (11-33-11-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-named well for the month of July, 1981. Yours very truly, RHR:ja Enclosures cc: Well File #17 R. H. Reiley District Drilling Engineer RECEIVED AUG 1 7 19F, t ~aska Oil & Gas Cons. Anchorage ' r STATE OF ALASKA _ ALASKA ([. AND GAS CONSERVATION CO( /IISSION ONTHLY REPORT OF DRILLING AND WO R_KOVER OPERATIONS ~1 Drdl~ng well [~ Workover operation [] 2 Name of operator Sohio Alaska Petroleum Ccmpany 3 Address Pouch 6-612, Anchorage, Alaska 4 Location of Well 99502 at surface 1479' SNL, 528' WEL, Sec. 33, TllN, R13E, UPM 5 Elevation ~n feet (~ndmcate KB, DF, etc ) I 6 Lease Designation and Serial No KBE = 85.54' AMSLI ADL 28287 7. Permit No. 81-112 8. APl Number 50-029-20634 9 umt or Lease Name Prudhoe Bay Unit 10 Well No Y-13 (11-33-11-13) 11 F,eld and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of July ,19 81 12 Depth at end of month, footage drdled, hshmg jobs, directional drdhng problems, spud date, remarks Spudded well at 2300 hours, 7/29/81 Depth at month-end: 2700' Footage dr illed: 2700 ' 13 Casing or hner run and quant~tms of cement, results of pressur9 tests Running 13 3/8" 72# L-80 Buttress casing at month-end. 14 Cormg resume and brief description None 15 Logs run and depth where run None ,1 6 DST data, perforating data, shows of H2S, m~scellaneous data None RECEIVED AUG 1 ? 198] Alaska 0il & Gas Cons. Commission Anchorage 17 I hereby certify that the foregoing ~s true and correct to the best of my knowledge SIGNED '~. TITLE District Drilling Enginee~ATE ~' ! ~" ~% NOTE--Report on th~s form ~s required for eac~alendar month, regardless of the status of operations, and must be fded mn duplicate w~th the Alaska O~1 and Gas Conservation CommIssion by the 15th of the succeeding month, unless otherwise d~rected Form 10-404 Submit mr~ duphcate Rev 7-1-80 ALASKA OIL AND GAS CONSERVATION COMMISSION Hoyle H. Hamilton~ Chairman Thru~ Lonnie C. Smith ~~6 Cc~missioner Bobby Foster tT >' Petroleum Inspector August 3, 1981 Witness BOPE Test on SOHIOts Y-13 Sec. 33 TllN, R13E, UM. Permit %81-112 Saturday Auqust_!, 1981 The BOPE test began at 3~00 a.m. and was concluded at 5~'30' ~'om. As the attached BOPE inspection report shows there were no failures. In summary I witnesse~ the BOPE test on SOHIO ts Y-13. O&G #4 4/80 \. STATE ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspectmon Report Reserve pit Rig Location, General Well Sign O ~ General Housekeeping BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Test Pres.sure R zg # Date Well Representative ~'est Results: Failures O Repair or Replacement of failed equzpment to be made w~thin '- ACCUMULATOR SYSTEM Full Charge Pressure ~,~ psig Pressure After Closure /~_~n'~''' '/*~..~ pszg 200 pslg Above Precharge Attested: mit /~ sec Full Charge Pressure Attested: ~ mln.~sec Controls: Master ~ ~ Remote~. Blinds switch cover~ Kelly and Floor Safety Valves Upper Kelly / Test Pressure -~O~ Lower Kell~ / Test Pressure ~O0 Ball Type / Test Pressure ~~ Inside BOP / Test Pressure ~//~ Choke Manifold ~.~ Test Pressure ~~ V vas No. flanges ~ Ad3ustable Chokes ~ Hydrauically operated choke / days and Inspector/Commisszon office notzfied. Remarks: Distribution orig. - AO&.GCC cc - Operator cc - Supervisor 1981 Mr. ~. H. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Prudl~oe Bay Dnit ¥-13 Sohio Alas~ka Petroleu~ Co~pany ~~t ~. 81-112 Sur. ~C,~ 528~L, 1479'8N~, Sec 33, TI~, RI~, U~. ~~ole ~.~ 364~L~ 182'~L, Sec 32, ~1~, R13E~ U~. Dear Mr. ~eliey s Enclosed is the approved application for permit to drill the above referenced well. Well samples and a mud log are not required. A directional survey is re~uired. If available, a tape containing the digttised log information sb~11 be submitted on all logs fo~ copying e~cept experi~ental logs, velocity ~rveys and dtpmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadra~ous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title ilask~ Ads~tnistrattve Code). Prior to c~ncing operations you may be con. tatted by the Habitat Coordinator's office~ Department of Fish and ~o Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the ~e~ulattons promulgated thermundez ('Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to Ar. R. H. Reile~ Prudhoe Bay Unit -2- July 27, 1981 cc~amncing operations you my be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a repre~ sentattve of the c~mtssion may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension or abandonment, please give this office adequate adval~ce notification so that we may have a witness, present. Very truly yours, HoF Ii H. ~milton Alash Oil S ~s Co~emtion C~tsoton lncloeare oct Depar~nt of Fish & Game, Habitat Section w/o encl. Department sT Environmental Conservation w/o/enclo SOHIO ALASKA PETROLEUM COMPANY , 3111 'C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAI L' POUCH 6-612 ANCHORAGE, ALASKA 99502 July 16, 1981 Alaska Oil & Gas Conservation Cc~mission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well Y-13 (11-33-11-13) Enclosed are the following documents, in triplicate, for the above-named well together with our check for $100.00 to cover the permit filing fee. 1. Application for Permit to Drill, 2. Proposed Drilling Program Outline, 3. Blowout Prevention Equipment Diagram, 4. Surveyor's plat showing well location, 5. Directional Map. If you have any questions, please contact either R. H. Reiley at 263-5183 or K. W. Kolthoff at 263-5176. RHR:ja Enclosures cc: Well File ~17 Yours very truly, R. H. Reiley District Drilling Engineer RECEIVED JUL ? 3 1981 Alaska Oil & Gas Cons. Commission Anchorage STATE Of ALASKA ALASKA('_ AND GAS CONSERVATION C( ,VIISSION PERMIT TO DRILL 20 AAC 25 005 la Type of work DRILL [] lb Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC [] REDRILL [] DEVELOPMENT OIL IXJ SINGLE ZONE [] DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE [] 2 Name of operator Sohio Alaska Petroleum Company 3 Address Pouch 6-612, Anchorage; Alaska 99502 ..... 4 Location of well at surface 9 Unit or lease name 528' WEL, 1479' SNL, Sec. 33, TllN, R13E, UPM Prudhoe Bay Unit At top of proposed produc,ng ,nterval (Target) 10 Well number 220' :~V-L, 330' SNL, Sec. 33, TllN, R13E, UPM Y-13 (11-33-11-13) At total depth 11 F~eld and pool 364' W~.L, 182' SNL, Sec. 32, TllN, R13E, URv[ ...... Prudhoe Bay 5 Elevation ~n feet (~nd~cate KB, DF etc ) J 6 Lease demgnat~on and serial no Prudhoe Oil Po(D'} Est. KBE = 86' AMSLJ ADL 28287 12 Bond information (see 20 AAC 25 025) Type Blanket Surety and/or numberSafeco Ins. 2975387 Amount $200,000., 00 13 D~stance and d~rect~on from nearest town 14 D,stance to nearest property or lease line 15 D~stance to nearest drilling or completed NW of F~dhorse 10 redes ADL 28288 220feet weHY-10 2700 feet 16- Proposed depth (MD & TVD) 17 Number of acres in lease 18 Approximate spud date 11581'MD 9667 IT VD feet 2560 August 15, 1981 t9 If dev,ated (see 20 AAC 25 050) 120 Ant~mpated pressures ~D . pslg@ .... Surface KICK OFF POINT 2800 feet MAXIMUM HOLE ANGLE 41 ol (see 20 AAC 25 035 (c) (2) __4_3.9__0__ps,g@ 8800 ft ~ (TVD]~ 21 Proposed Casing, L~ner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF cEMENT Hole Camng Wmght Grade coupling Length MD TOP TVD MD BOTTOM TVD (~nclude stage data) 36" ~0X30 Insu]at'.ed CondLuctor 110 Surface 110~ 110 8 cu,yds. Concrete 17 1/2 13 3/8 729 L-80 Butt. 2680 surface 2680 Il 2680 3720 cu. ft. pe~-~r~froSl 12 1/4 9 5/8 47~ L-80 Butt. 10403 Surface 10403 I 8782 1190 cu. ft. Class G, ~ I 130 cu ft. Permafr°s { · 8 1/2 7 299 L-80 Butt. 1678 9903 ~,~ 8407 .11581 [ 9667 315 cu.ft. Class G 22 Describe proposed program W/18% salt See attached proposed drilling program outline. RECEIVEI) JUL 2 3 1981 A~sk~ 0il & Gas Cons Commissio~ Anchorage 23 I hereby certify t~he best of my knowledge SIGNED TITLE District Drilling Engine~ATE The space below for ~mmlsslon ~se R. ' H. Reil'~ CONDITIONS OF APPROVAL Samplesrequ,red J Mud Icg required D,rect,onalSurveyreqmred J APl number •YES ~_NO1 t~YES [~NO ,J~YES [-JNOJ 50- Permit number Approval date ,.~'"0/~ //~ 07/27/81 I SEE COVER LETTER FOR OTHER REQUIREMENTS --, APPROVED BY ~ ,COMMISSIONER DATE July 27, 1981 _,(" -// ~' ' by order of the Commission II Form 10~.01 Submit ,n tr~phcate Rev 7-1-80 PROPOSED DRILLING AND CCMPLSTION PROGRAM WELL Y-13 (11-33-11-13) Dry bucket 36" hole to 80' below ground level ard cement 20" x 30" insulated conductor to surface using 8 cu.yds, concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Permafrost II cement. Blcwout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Maximum possible bottomhole pressure is 4390 psi at 8800 TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to 8786' TVD. Run 9 5/8" 47# L-80 Buttress casing to 8782' TVD and cement first stage with 1190 cu. ft. Class G cement. Cement second stage through D.V. packer collar at 2600' with 130 cu. ft. Permafrost C cement. 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Drill 8 1/2" hole to T.D. at 9667' TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 315 cu. ft. Class G cement with 18% salt. Run 4 1/2" 12.69 L-80 A/B mod. Buttress IPC tubing with 7 gas lift mandrels and a production packer assembly at 8369' TVD. A subsurface safety valve with dual control lines will be placed at 2075'. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. RECEIVED JUL ? $1981 Al.~ska Oil & Gas Cons. Commissior~ Anchorage, B.O.P( STACK CO 1:5 5/8" TRIPLE NFIG,U~~TION RAM STACK i 5000 PSI WP ! DRILLING i i i ANNULAR PREVENTER PIPE RAMS 2" KILL LINE CHECK GATE GATE · BLIND RAMS DRILLING SPOOL PIPE RAMS 4" CHOKE LINE GATE HYDR. ASST. GATE RECEIVED JUL P 3 1981 Alaska Oil & Gas CoDs. Cornrnis$ioD Anchorage 4O I0 20 04 21 40 I0 ZO 22 $o 40 { I ~ (Actuel) i O3 04 OI 02 03 04 PORTION OF T II N, R i:3 E, UM SCALE I"= I/2 MILE CERTIFICATE OF SURVEYOR I hereby certify that lam properly registered to practice land surveying in the State of Alaska and that this plat represents a location survey of the wellpad shown and the wells thereon. This survey was made by me or under my supervision and all dimensions and other details are correct. Bottom hole locations are furnished by others. _ o~ ~.. ~. :,,~--,, ~ ..... PAD DETA!L SCALE I": :500' NOTE: All bottom holes ate 8800' sub sea. _ ,_ I 02 ( 14 -£?- I I- IJ ) (4J-Re-Il-l J) ( ~1-34-/i- IJ) ( ~.3 . z~,e -ii-/j/ t'22-$~, tl. !$) SUMP - 05-/0-/$J ~// - 05-/0- f$/ - 33-//-/$/ ($$ - $$.//./$] [4~.$$-/I- I¥-/ · Y.$ · ¥-4 · Y-5 lY-7' I¥- I0 1~14 Proposed BHL Y-13 Add Proposed BHL Y-I0 Revise BHLY- $,4,& II from Proposed to Actual &IId Proposed BHL Y- 9 Add Proposed BHL Y-8 Rev,sed Proposed 9HLY-7 Md ~ BHLY-7 ~ Pro~d BHL Y-12 Ad~ Pro~ BHL Y-II Ail B~Nm Holes ore 8~' sub sea ~evised BNL Y- I,~,5 ~ 6 from ~ to ~t~ 6/2~LAI Date Surveyor NOTE: Plat doted Aug ~0,1979 che~ged to Oct 2, ~T9. B~ ~ .--~ 1,~ ,6 c~,d ~I~-' ~-'<~1,. PAD "Y" . NE !/4~ NW ~ ~TRAC~D ~ 33&,~T~N.~M~A~ a~~a'a~"~"--'"'-~ JUL 2 ~ ]98]i Su.v.. ~o. ..... ~~~;'~ ~ ~,a,~ 0, ~ ~. co.~. Co'..,~,0~O"~O ~ ~ T,O~E U~ CO. · ,--,' -~ E M. LINDSEY & ASSOC. ~~~~ LAND ~ HYDROGRAPHIC SURVEYORS 250~ ~est Northern Lights Boulevar~ Box ) ~ ~: ~b ,,t "Anchorage AJe~kn CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. /~. /r~./_~. ITEM APPROVE DATE YES NO REMARKS (1) Fee ~/~ 7'2~'~/ ~ , (2) Loc /~/~OK z/- zg-g/ (2 thru 8) 1. Is the permit fee attached .......................................... ,.~J( 2. Is well to be located in a defined pool ............................. ~ 3. Is well located proper distance from property line .................. /~ 4. Is well located proper distance from other wells .................... A¢~ __ 5. Is sufficient undedicated acreage available in this pool ............ ~ 6. Is well to be deviated and is well bore plat included ............... .~ 7. Is operator the only affected party ................................. 4¢t0~ 8. Can permit be approved before ten-day wait .......................... f~A~ __ (3) Admi.___p_n ~/~OK ¢-2~r-ff/ 9. (9 thru 11) 10. 11. (4> Casg~~____ ~0j ~.~-% / Bi2 thru 2 (5) BOPE(~-~ 7-2~X/ ~-('21 thru -24) 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Does operator have a bond in force .................................. i/~0~ Is a conservation order needed ...................................... ~ M~ai_~ Is administrative approval needed ................................... ~ Is conductor string provided ...................................., · Is enough cement used to circulate on conductor and surface ...'..' Will cement tie in surface and intermediate or production strings · Will cement cover all known productive horizons ........... ,., ,,, , , Will surface casing protect fresh water zones .... '''.''' ..... '..' Will all casing give adequate safety in collapse, tension and burst Is this well to be kicked off from an existing wellbore ........... Is old wellbore abandonment procedure included on 10-403 ............ , Is adequate well bore separation proposed ........................... ~~---- · .... Is a diverter system required ...... B t ch;d .. Are necessary diagrams of diverter a Does BOPE have sufficient pressure rating '- Test to ~.~>~p~ .. Does the choke manifold comply w/AP1 RP-53 (Feb.78) .................. Additional requirements ............................................. Additional Remarks: Mc" Geology: , Enginge?,ring: ' cs WVA~ JKTfi2/,~ ~ JAL~. rev: 03/10/81 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Y - 13 ~1-~~ PRUDHOE BAY~/~ Run 1' 2~ - August - 19~4 PDK-1001GR Log 10300 0655 Atlas Wireline Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD Y - 13 500292063400 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 19-SEP-94 4811.01 K. BRUNNER D. SCHULDT 33 llN 13E 1479 528 85.50 84.00 50.00 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 10357.0 3RD STRING 7.000 11288.0 PRODUCTION STRING 4.500 9947.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: BCS PBU CURVE CODE: GR RUN NUMBER: 2 PASS NUMBER: 1 DATE LOGGED: 29-JUL-81 LOGGING COMPANY: SWS -- EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH 10260.0 10260.0 10365.5 10366.5 10373.5 10375.5 10384.0 10384.0 10388.0 10388.0 10393.0 10393.0 10411.5 10411.5 10423.0 10425.0 10435.0 10436.0 10437.5 10439.5 10451.0 10452.5 10466.0 10467.0 10481.0 10482.0 47.00 26.00 12.60 10502.0 10504.5 10530.0 10532.5 10535.0 10543.5 10555.5 10567.5 10587.5 10612.0 10628.0 10634.0 10695.0 $ REMARKS: 10503.0 10506.0 10530.0 10532.5 10535.0 10543.5 10555.5 10567.5 10587.5 10611.5 10628.0 10633.5 10695.0 PDK-100/GR Log. LOG TIED INTO CBL RUN 19-AUG-81. LOGGING PROGRAM ORGANIZATION: 1. LOGGED A PASS WITH WELL FLOWING. 2. PUMPED 200 BBLS SEAWATER. 3. LOGGED A BASE SEAWATER PASS. 4. PUMPED 30 BBLS BORAX. 5. LOGGED A BORAX PASS. 6. FLUSH WITH SEAWATER. 7. LOGGED A FLUSH PASS. A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR EACH PASS. THE CURVE IS NAMED SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS FOR THE FLOWING PASS: BOREHOLE SIZE = 8" CASING SIZE = 7" SALINITY = 0 PPM THE SGNT CURVE WAS CORRECTED WITH THE FOLLOWING PARAMETERS FOR ALL OTHER PASSES: BOREHOLE SIZE = 8" CASING SIZE = 7" SALINITY = 25,000 PPM A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR THE FLOWING AND BASE SEA WATER PASSES. SHIFT PROCEDURE AS FOLLOWS: 1. FIRST PASS GAMMA RAY DEPTH MATCHED TO PREVIOUS OPEN HOLE GAMMA RAY. 2. FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS SGMA. /??MATCH1A.OUT FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 10273.0 10638.0 10285.0 10650.0 BASELINE DEPTH SGMA 10260.0 10260.0 10353.5 10353.0 10368.5 10368.5 10388.0 10387.5 10392.0 10391.0 10394.0 10393.0 10394.5 10394.0 10410.0 10409.5 10416.0 10416.0 10416.5 10416.5 10425.0 10427.0 10430.0 10431.0 10432.5 10433.5 10434.5 10436.0 10445.0 10446.0 10464.0 10466.0 10474.0 10475.5 10488.0 10488.5 10489.5 10490.0 10499.5 10501.5 10503.0 10504.5 10511.0 10512.5 10512.5 10514.5 10535.0 10535.0 10556.0 10556.0 10568.0 10567.5 10588.0 10588.0 10612.0 10612.0 10634.0 10634.0 10641.0 10641.5 10647.0 10648.0 10656.5 10657.5 10657.0 10658.5 10695.0 10695.0 $ REMARKS: (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... FLOWING PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH1B . OUT $ CN : BP EXPLORATION WN : Y - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 1 CU 13 SGMB PDK 68 1 CU 14 SS PDK 68 1 CPS 15 SGNT PDK 68 1 CU 16 PHI PDK 68 1 PU-S * DATA RECORD (TYPE# 0) Total Data Records: 63 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 4 00 201 24 1 4 00 201 24 1 4 00 201 24 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 64 958 BYTES * Tape File Start Depth = 10695.000000 Tape File End Depth = 10260.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14808 datums Tape Subfile: 2 250 records... Minimum record length: Maximum record length: 62 bytes 958 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10278.0 10290.0 BASELINE DEPTH GRCH 10262.0 10349.0 10348.0 10384.0 10382.5 10390.0 10400.0 10403.0 10404.0 10406.0 10417.0 10415.5 10417.5 10416.5 10418.0 10419.5 10420.0 10429.0 10430.0 10440.0 10440.0 10450.0 10450.5 10453.5 10453.5 10454.5 10454.0 10455.0 10455.5 10458.0 10459.0 10477.0 10480.0 10479.5 10482.5 10488.5 10489.5 10490.5 10491.0 10495.5 10496.0 10496.0 10500.5 10500.0 10502.0 10502.0 10510.5 10511.0 10511.5 10511.5 STOP DEPTH 10643.0 10655.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH - SGMA 10260.0 10388.0 10400.5 10403.5 10404.0 10404.5 10416.5 10419.0 10420.0 10429.0 10429.5 10449.5 10450.5 10455.0 10456.0 10458.5 10459.0 10477.0 10482.0 10488.0 10488.5 10489.5 10491.0 10495.5 10502.5 10517.5 10518.5 10523.0 10525.0 10526.0 10529.5 10530.5 10532.5 10539.0 10539.5 10549.0 10550.0 10563.5 10564.5 10565.5 10566.0 10568.0 10569.0 10571.0 10572.5 10575.0 10580.5 10584.5 10589.5 10592.5 10593.0 10594.0 10613.5 10616.0 10617.0 10622.5 10627.5 10628.5 10629.0 10630.0 10630.5 10631.0 10632.5 10643.5 10646.5 10655.5 10656.0 10658.0 10685.0 10685.5 $ REMARKS: 10532.0 10538.5 10539.5 10518.0 10518.5 10523.5 10525.5 10526.0 10529.5 10530.0 10548.5 10550.0 10563.5 10564.0 10565.0 10566.0 10568.0 10568.5 10570.5 10572.5 10575.0 10581.0 10585.0 10589.5 10592.5 10593.5 10594.0 10614.0 10616.5 10617.5 10622.5 10628.5 10628.5 10629.5 10631.0 10631.5 10632.0 10633.0 10644.5 10650.0 10659.0 10659.5 10661.5 10688.5 10689.0 BASE SEAWATER PASS, 200 BBLS SEAWATER AWAY. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH2A. OUT /??MATCH2B. OUT $ : BP EXPLORATION : Y- 13 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 2 BIF PDK 68 3 BKL PDK 68 4 BKS PDK 68 5 CSLS PDK 68 6 LS PDK 68 7 MSD PDK 68 8 RATO PDK 68 9 RBOR PDK 68 10 RICS PDK 68 11 RIN PDK 68 12 SGMA PDK 68 13 SGMB PDK 68 14 SS PDK 68 15 SGNT PDK 68 16 PHI PDK 68 GAPI CPS CPS CU CPS CU CU CU CPS CU PU-S 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 4 4 O0 201 24 1 64 * DATA RECORD (TYPE# 0) 958 BYTES * Total Data Records: 63 Tape File Start Depth = 10695.000000 Tape File End Depth = 10260.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14808 datums Tape Subfile: 3 179 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: BASELINE DEPTH 10260.0 START DEPTH 10261.0 10273.0 GRCH 10286.0 10290.0 10308.0 10309.5 10309.0 10310.5 10346.5 10347.0 10348.5 10349.0 10377.0 10378.5 10378.0 10379.0 10379.5 10380.5 10380.5 10381.0 10388.0 10388.0 10390.0 10394.5 10394.5 10395.5 10395.0 10400.0 10402.0 10403.0 10403.5 10406.0 10407.0 10416.0 10415.5 10416.5 10416.5 10417.0 10417.5 10418.0 10418.0 10418.5 10419.5 10420.0 10421.5 10422.0 10425.5 10428.5 10429.0 10430.0 10431.0 10431.5 10432.5 10453.0 10453.0 STOP DEPTH 10638.0 10650.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... SGMA 10260.0 10287.0 10290.0 10390.0 10402.0 10404.0 10404.5 10405.0 10406.0 10406.5 10416.5 10417.5 10418.5 10420.0 10421.0 10422.5 10423.5 10427.0 10429.5 10430.0 10430.5 10459.0 10459.5 10467.0 10472.0 10476.0 10480.0 10480.5 10488.5 10489.5 10490.0 10490.5 10493.0 10493.5 10500.0 10506.5 10509.5 10510.5 10512.0 10515.5 10516.5 10532.5 10547.5 10550.5 10559.0 10571.0 10575.0 10593.5 10604.0 10609.5 10610.5 10611.5 10612.0 10614.5 10615.5 10616.5 10628.0 10630.0 10633.0 10634.0 10637.5 10638.5 10639.0 10642.0 10642.5 10643.0 10644.5 10646.0 10649.0 10655.5 10656.0 $ REMARKS: 10480.5 10501.0 10510.5 10511.0 10512.5 10532.0 10547.0 10550.5 10611.5 10612.5 10615.0 10615.5 10629.0 10631.0 10633.0 10642.0 10642.5 10459.5 10460.5 10468.0 10472.5 10476.5 10480.0 10488.5 10489.0 10489.5 10490.5 10493.0 10494.0 10507.0 10516.5 10517.5 10558.5 10570.5 10575.0 10593.5 10604.5 10610.0 10610.5 10616.5 10628.5 10634.5 10638.5 10639.5 10640.5 10644.5 10645.5 10647.0 10647.5 10654.0 10654.5 BORAX PASS, 30 BBLS BORAX AWAY. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ??MATCH3A. OUT /??MATCH3B. OUT $ CN : BP EXPLORATION WN : Y - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 i CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 1 CU 13 SGMB PDK 68 1 CU 14 SS PDK 68 1 CPS 15 SGNT PDK 68 1 CU 4 4 00 201 24 1 4 4 00 201 24 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 6O * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 59 Tape File Start Depth = 10695.000000 Tape File End Depth = 10260.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 28745 datums Tape Subfile: 4 180 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10280.0 10292.0 STOP DEPTH 10636.0 10648.0 (MEASURED DEPTH) in separate files. ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH GRCH 10284.0 10284.5 10284.5 10285.0 10303.0 10347.5 10347.5 10348.5 10348.5 10349.0 10349.5 10380.0 10380.5 10381.0 10381.0 10382.0 10382.0 10382.5 10383.0 10384.0 10383.5 10384.5 10385.5 10394.0 10393.5 10395.0 10394.0 10396.0 10402.5 10403.5 10406.0 10407.5 10406.5 10408.0 10407.5 10418.0 10417.5 10422.0 10424.0 10429.5 10429.5 10430.5 10430.5 10431.0 10431.5 10431.5 10432.0 10432.5 10432.5 10437.0 10439.0 10446.0 10453.5 10453.5 10454.5 10454.0 10455.0 10455.5 SGMA 10302.5 10380.5 10381.0 10381.5 10382.5 10384.0 10384.5 10393.0 10393.5 10394.0 10403.0 10404.0 10405.0 10417.0 10423.0 10425.0 10429.5 10437.0 10439.5 10446.0 10455.0 10456.0 10462.5 10463.5 10464.0 10471.0 10476.0 10477.0 10478.5 10482.5 10490.5 10491.0 10496.0 10500.0 105OO.5 10510.0 10511.0 10512.0 10533.5 10550.5 10551.0 10559.5 10562.5 10571.5 10573.0 10577.5 10587.0 10605.5 10621.5 10627.5 10630.5 10635.0 10636.5 10638.0 10642.0 10642.5 10644.5 10646.0 10649.0 10655.5 10656.0 10658.0 10684.0 10684.5 $ REMARKS: 10463.0 10463.0 10463.5 10464.0 10471.0 10476.0 10476.5 10478.0 10481.5 10489.5 10491.0 10496.0 10500.0 10501.0 10510.5 10511.0 10512.0 10532.5 10549.5 10550.5 10558.5 10562.0 10570.5 10572.0 10577.0 10586.0 10605.0 10621.0 10627.5 10630.0 10635.0 10634.5 10638.5 10642.5 10640.5 10643.5 10645.0 10645.5 10652.0 10652.5 10657.0 10683.0 10683.5 FLUSH PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH4A . OUT / ? ?MATCH4 B. OUT $ : BP EXPLORATION : Y- 13 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 i 4 3 BKL PDK 68 I CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 MSD PDK 68 1 CU 4 8 RATO PDK 68 1 4 9 RBOR PDK 68 1 4 10 RICS PDK 68 1 4 11 RIN PDK 68 1 4 12 SGMA PDK 68 1 CU 4 13 SGMB PDK 68 1 CU 4 14 SS PDK 68 1 CPS 4 15 SGNT PDK 68 1 CU 4 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 4 00 201 24 1 4 00 201 24 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 60 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 59 Tape File Start Depth = 10695.000000 Tape File End Depth = 10260.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 28745 datums Tape Subfile: 5 172 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10272.0 PDK 10284.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10638.0 10650.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): ' BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 29-AUG-94 FSYS REV. J001 VER. 1.1 1024 29-AUG-94 10667.0 10663.0 10300.0 10655.0 1200.0 YES TOOL NUMBER 2725XA 2324XA 2120XA 0.000 11288.0 0.0 PROD. FLUIDS/BORAX 0.00 0.0 231.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 800 FAR COUNT RATE HIGH SCALE (CPS): 3300 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: FLOWING PASS. $ CN : BP EXPLORATION WN : Y - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units 1 GR PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CCL PDK 68 1 6 CSLS PDK 68 1 CU 7 CSS PDK 68 1 CPS 8 ISS PDK 68 1 CPS 9 LS PDK 68 1 CPS 10 MON PDK 68 1 CPS 11 MSD PDK 68 1 CU 12 RATO PDK 68 1 13 RBOR PDK 68 1 14 RICS PDK 68 1 15 RIN PDK 68 1 16 SGMA PDK 68 1 CU 17 SGMB PDK 68 1 CU 18 SPD PDK 68 1 F/MN 19 SS PDK 68 1 CPS 20 TEN PDK 68 1 LB 21 SGNT PDK 68 1 CU 22 PHI PDK 68 1 PU-S API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 06 511 09 0 4 4 00 201 24 1 4 4 39 705 61 6 4 4 74 169 61 6 4 4 92 630 79 6 4 4 00 201 24 1 4 4 00 201 24 1 4 4 71 162 89 6 4 4 71 162 89 6 4 4 32 125 68 0 4 4 00 201 24 1 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 96 761 61 6 4 4 00 201 24 1 4 4 52 386 28 5 4 4 05 626 89 6 4 4 17 922 28 5 4 4 00 201 24 1 4 4 00 201 24 1 mmmmmmm 88 * DATA RECORD (TYPE# 0) Total Data Records: 138 1018 BYTES * Tape File Start Depth = 10650.000000 Tape File End Depth = 10272.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 63545 datums Tape Subfile: 6 214 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10276.0 PDK 10288.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10647.0 10659.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 29-AUG-94 FSYS REV. J001 VER. 1.1 1205 29-AUG-94 10667.0 10663.0 10300.0 10655.0 1200.0 YES TOOL NUMBER 2725XA 2324XA 2120XA 0.000 11288.0 0.0 PROD. FLUIDS/BORAX 0.00 0.0 231.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 800 FAR COUNT RATE HIGH SCALE (CPS) : 3300 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: SEAWATER PASS, 200 BBLS SEAWATER AWAY. $ CN : BP EXPLORATION WN : Y - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 1 4 15 RIN PDK 68 1 4 16 SGMA PDK 68 1 CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 1 F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 4 4 4 4 4 4 4 4 4 4 88 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 4 00 201 24 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 23 260 40 0 23 260 40 0 23 260 40 0 23 260 40 0 96 761 61 6 00 201 24 1 52 386 28 5 05 626 89 6 17 922 28 5 00 201 24 1 00 201 24 1 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 140 Tape File Start Depth = 10659.000000 Tape File End Depth = 10276.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 64005 datums Tape Subfile: 7 216 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10260.0 PDK 10272.0 $ LOG HEADER DATA STOP DEPTH 10640.0 10652.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 29-AUG-94 FSYS REV. J001 VER. 1.1 1255 29-AUG-94 10667.0 10663.0 10300.0 10655.0 1200.0 YES TOOL NUMBER 2725XA 2324XA 2120XA 0.000 11288.0 0.0 PROD. FLUIDS/BORAX 0.00 0.0 231.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 800 FAR COUNT RATE HIGH SCALE (CPS): 3300 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: BORAX PASS, 30 BBLS BORAX AWAY. $ CN : BP EXPLORATION WN : Y - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units 1 GR PDK 68 i GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CCL PDK 68 1 6 CSLS PDK 68 1 CU 7 CSS PDK 68 1 CPS 8 ISS PDK 68 1 CPS 9 LS PDK 68 1 CPS 10 MON PDK 68 1 CPS 11 MSD PDK 68 1 CU 12 RATO PDK 68 1 13 RBOR PDK 68 14 RICS PDK 68 1 15 RIN PDK 68 1 16 SGMA PDK 68 1 CU 17 SGMB PDK 68 1 CU 18 SPD PDK 68 1 F/MN 19 SS PDK 68 1 CPS 20 TEN PDK 68 1 LB 21 SGNT PDK 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 4 00 201 24 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 52 386 28 5 4 05 626 89 6 4 17 922 28 5 4 00 201 24 1 84 * DATA RECORD (TYPES 0) Total Data Records: 142 974 BYTES * Tape File Start Depth = 10650.000000 Tape File End Depth = 10260.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 97888 datums Tape Subfile: 8 218 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10278.5 PDK 10290.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10636.0 10648.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 29-AUG-94 FSYS REV. J001 VER. 1.1 1321 29-AUG-94 10667.0 10663.0 10300.0 10655.0 1200.0 YES TOOL NUMBER 2725XA 2324XA 2120XA 0.000 11288.0 0.0 PROD. FLUIDS/BORAX 0.00 0.0 231.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 800 FAR COUNT RATE HIGH SCALE (CPS): 3300 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS'. FLUSH PASS. $ CN : BP EXPLORATION WN : Y - 13 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 I GAPI 4 2 BIF PDK 68 I 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 1 4 15 RIN PDK 68 1 4 16 SGMA PDK 68 1 CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 1 F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 1 LB 4 4 21 SGNT PDK 68 1 CU 4 4 84 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 52 386 28 5 4 05 626 89 6 17 922 28 5 00 201 24 1 * DATA RECORD (TYPE# 0) 974 BYTES * Total Data Records: 134 Tape File Start Depth = 10648.000000 Tape File End Depth = 10280.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 96412 datums Tape Subfile: 9 210 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 10 is type: LIS 94/ 9/19 01 **** REEL TRAILER **** 94/ 9/19 O1 Tape Subfile: 10 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 19 SEP 94 3:21p Elapsed execution time = 15.27 seconds. SYSTEM RETURN CODE = 0 ~mmmmmmmmm..mmmmmmmmm~ ~----BCHLUMBERGER----~ ~mmmmmmmmmmmmmmmmmmmm~ LIS TAPE VERIFICATION LISTING LVP 009,.H05 VERIFICATION LISTING PAGE ~ REL~ HEADER ~ SERVICE NA~E :EDII DATE :81/ / 4 ORIGIN : REEL NAME :P.C.A.L. CONTINUATION # ~Ol PREVIObS REEL : COMMENTS : LIS FORMAT CUSTOMER TAPE ~ TAPE HEADER ~ SERVICE NAME :EDIT DATE :81/ 9/ ~ ORIGIN : TAPE NAME :62i20 CONTINUATION # :01 PREVIOUS TAPE : CO~ENTS ~ ~ COMMENTS ~ TAPE COMMENTS DIL RUN # ~, LOGGED 16-AUG-81 CASING DRILLER : ~ i0163 FT, CASING LOGGER : 10~48 FT. BIT SIZE m 8.5 IN, FLUID IN THE HOLE : GEL/POLYMER DENS = 9,8 VISC = ~9,0 PH = 9.5 FLUID LOSS = 5,2 ML RM ~ ~EAS TEMP, = ~..890 ~ 74 F, RMF " " = ~.7)0 @ 6i,0 F. R~C " " = 1.750 ~ 60.0 F. L~P 009.H05 VERIFICATION LISTING R~ ~ 5HT POROSITY MATRIX 0,781 @ 189 F. LIMESTONE PAGE ~ FILl HEADER FIhE NAME :EDIT .001 SERVICE NA~,f VERSION # DAT~ : MAXIMUM 5ELGTH : 1024 FILE TYPE PREVIOUS FILE ~ INFORMATION RECORDS MNE~ CONTENTS UNIT TYPE CATE SIZE CODE CN : SOHIO PETROLEUM COX WN : Y-13 FN : PRUDHOE BAY RANG: TOWN: SEC~: 33 COUN: NORTH SLOPE STAY: ALASKA DENS: 80 000 000 019 065 000 000 004 065 000 000 011 065 000 000 003 065 000 000 003 065 000 000 002 065 000 000 011 065 000 000 006 065 000 000 004 065 ~ DATA FORMAT RECORD ~ ENTRY BLOC¥S TYPE SIZE REPR CODE ENTRY 0 ! 66 0 DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE UNIT API AP1 APl API FILE SIZE PROCESS SAMPLE REPR ID ORDER # ~OG TYPE CLASS ~OD NO. LEVEL CODE 68 DEPT FT 0 SP DIL ~V 7 IUD DIL OHMS 7 ILS DIL OHM~ 7 SFLU DIL OHMS 7 GR DIL GAPI 7 GR CNL GAPI 42 CALf CNL IN 42 DRHO CNL G/C~ 42 0 0 0 0 4 1 0 0 0 4 12 46 0 0 4 12 44 0 0 4 22 1 0 0 4 31 32 0 0 4 31 ~2 0 0 4 28 1 0 0 4 ~4 0 0 0 4 LVP OO9,.H05 VERIFICATION NPHI CNL PU 42 R~OB CNL G/C3 42 NRAT CNL C/C 42 NCNb CNL CPS 42 FCNb CNL CPS 42 DT BffC U$/~ 60 DEPT SFLU DRHO NCNb DEPT SFbU DRHO NCNb DEPT DRHO NCNb DEPT DRHO NCNb DEPT SFLU DRHO NCNb DEPT SFLU DRHO NCNb DEP~ DRHO NCNb DEPT DRHO NCNb DEPT SFLU DRHO NCNb 68 35 42 34 34 3 1 1 92 93 32 ATA 11320. 16. O. 3046, 11300, 16. O. 3046, 11200, 10. O. 3174. 11100. 7. O. 3690. 11000, 16. O, 5256, 10900. 5. O. 4072. 10800, 3, O, 3986. 10700. 5. O. 3734, 106O0, 14. O. 3618. 000 125 215 000 000 094 209 000 000 125 035 000 000 352 O25 000 000 125 012 000 000 133 043 000 000 695 040 000 000 402 023 000 000 242 021 000 SP GR NPHi FCNb SP GR NPHI FCNb 8P NPHI FCNb SP GR NPHI FCNL GR NPHI FCNL SP GR NPHI FCNb SP GR NPHI SP GR NPHZ FCNb SP GR NPHI FCNL -29,266 -171.375 19,238 1400.000 -6,516 -171.375 19.238 1400.000 -10.648 106.500 16.064 1388.000 -73.000 60.813 19.482 1553.000 -42.156 48.563 8.887 3322.000 -79.063 19.688 16.113 1926.000 -67.688 29.969 17.236 1924,000 -80.000 30.172 19.531 1679.000 -72.375 24.484 19,434 1638,000 GR RHOB DT ILD GR RMOB DT 1ED GR RHOB DT GR DT GR RHOB DT ILD GR RHO8 DT GR RHOB DT 1ED GR RHOB DT ILD GR RHOB DT 6,406 127,688 7~ '549 ,750 6.387 127,688 2,543 71.750 6 250 104:938 2,654 73,563 3,252 58,969 2 39i 80:563 8,477 45.406 2,531 66.188 2.631 36,3:3.2 2.506 79,188 479 2.320 84.750 12,680 28,453 2,367 89.375 CALl NRAT CALI NRAT IbM CALl NRAT IbM CALl NRAT IbM CALI NRAT IbM CALl NRAT IbM CALl NRAT IbM CALI NRAT CALI NRAT PAGE 68 68 68 68 68 5.262 8.500 2,219 5,250 7.426 2,219 6,195 8 766 3 734 8i289 2 299 9.078 8,469 1,602 320 2.072 2.89! 8,367 2.156 8, 2,305 11.594 8,406 2.305 DEPT 10500.000 SP SFUU 22.i72 GR DRHO -0.0i3 NPHI NCNL 4404.000 FCNU DEPT !0400. 000 SP SFUU i4.78 ! GR DRHO 'O.OO1 NPHI DEPT 10200.000 SP SFUU -999.~00 GR DRHO -999.250 NPHI NCNb -999.250 FCNU DEPT 1~100 OO0 SP SFLU -999~300 GR DRHO ~999 250 NPHI NCNL 999:250 FCNU DEP£ 10000,000 SP SFUU -999.300 GR DRHO -999.250 NPHI NCNL -999.250 FCNL DEPT 9900.000 SP SF~U -999.300 GR DRHO ~999.250 NPHI NCNL 999.250 FCN~ DEPT 9500.000 SP SFUU -999.300 GR DRHO :999,250 NPHI NCN~ 999.250 FCNL DEPT ~700,000 SP SFUU 999.300 GR DRHO -999.250 NPHI NCNL -999.250 FCN5 DEPT 9600.000 SP SFUU -999.300 GR DRHO ~999 250 NPHI NCNL 999:250 FCNU DEPT 9500.000 SP SFLU -999.~00 GR DRHO '999.250 NPHI 19 22 -9 2 -9 -999 -9 -9 9 '9.99 -9 -999 -9 -9 -99.9 '9 -999 -9 -9 -999 -9 -9 -999 -9 -9 -999 25. 17. 40. 64. I2. 40. 99. 54. 5u. 99. 99. 49. 25. 99. 99. 74. 25. 99. 99. 55. 25. 99. 99. 61. 25. 99. 99. 99, $4, 25° 99, 063 063 529 000 688 969 598 000 300 438 592 500 300 844 000 250 300 125 000 250 300 344 000 250 300 656 O0 3O0 000 000 3OO ?~0 000 25O 0~3 000 ~00 250 000 IUD RHOB DT IUD GR RHOB IbD GR RHOB IUD RHOB DT IUD RHOB D? GR RHOB DT GR DT GR RHOB DT GR RHOB DT GR RHOB DT GR RHOB 13,164 94.938 8 11,289 59,469 2,428 78,750 -999.300 66,875 99~'010 - .300 -999,300 . 50 -999,300 2999.250 999.300 -999.~00 -999.250 -999.250 -999.300 99,250 '999,300 '99 50 '999,300 '999.300 '999,250 999,250 2999.300 -999.~00 -999,250 -999,250 -999.300 999. 50 '999.250 CALl NRAT CALl NRAT CA5I NRAT CALI NRAT CALl NRAT CALI NRAT CALI NRAT CALl NRAT CAUI NRA~ CAUI NRAT CALI NRAT .1.3,g36 8. 53 2,221 10.756 9,9211 1. 13 . 86 4.762 '999,300 '9 , 50 - 300 '999,250 '999,30O 5O -999~250 -999.~00 ° , 0 o -999,250 -999.300 50 i999.300 999,250 999,250 NCNL DEPT SFLU DRHO NCNL DEPI SFLU DRHO NCNL DEPT SFLU DRHO DEPT DRHO NCNu DEPT DRHO NCNL DEPT SFLU DRHO NCNL DEPT SFbU DRHO NCNL DEPT SFLU NCNb DEPT DRHO NCNb DEPT SFLU DRHO NCNL DEPT 009..H05 VERIFICATION -999,250 FCNb 9400.000 SP -999,300 GR -999,250 NPHI -999.250 FCNb 9300,000 $P -999,300 GR -999,250 NPHI -999.250 FCNL 9200,000 SP -999.300 GR -999,250 NPHI -999,250 FCNL 9100.000 SP '999.300 GR -999.250 NPHI -999.250 FCNL 9000,OOO SP -999,300 GE -999 250 NPH1 -999:250 FCN~ 8900,000 SP -999.300 GR -999.250 NPHI -999.250 FCNb ~800.000 -999.300 GR -999,250 NPH! -999,250 FCNb 8700.000 SP -999.300 GR -999,250 NPHI -999.250 FCNb 8600,000 SP -999.300 GR -999,250 NPHI -999,250 FCNL 8500.000 SP -999.300 GE -999,250 NPHI -999.250 FCNL 8~00,000 SP -999.300 GE LISTING -999.250 '999.300 44 938 GR '99925:000 RHOB '999,250 '999.300 64,000 -99925.000 R~OB '999,250 DT -999.300 57,000 GR -99925,000 RHOB -999,250 DT -999.300 IbD 64,18~ GR -99925.000 RHOB -999.250 DT -999.300 64,688 GR -99925,000 RHOB -999,250 DT -999,300 60.719 GR -99925.000 RHOB -999.250 DT -999.300 IbD 90.000 GR -99925.000 RHOB -999.250 DT -999.300 93.500 GR -99925.000 RH00 -999.250 DT -999,300 IGD 119.250 GR -99925.000 RHOB -999.250 DT -999.300 IbD 67.188 GR -99925,000 RHOB '999.250 DT -999.300 95,875 GR -999.300 -999.300 -999.25U -999.250 -999.300 '999,300 '999,250 '999,250 '999,300 '999,300 '999 250 -9991250 -999.300 '999,300 '999,250 '999.250 '999,300 '999,300 '999,250 '999,,250 -999.300 -999.300 -999,250 -999,250 -999,300 -999,300 ~999,250 999,250 -999,300 -999 '999,250 '999.300 '999.300 -999,250 -999,250 -999.300 '999,300 '999,250 '999,250 '999,300 -999,300 -999,250 CAbI NRAT IbM CALI NRAT CALl NRAT IbM CALl NRAT CALl NRAT IbM NRAT CALI NRAT CALl NRAT CASI NRAT CALl NRAT IbM CALI PAGE -999 300 -999i250 -999. 250 ,~999. O0 999 23 . 50 -999.250 '999,300 '999,250 -999.250 -999,,]00 -999.250 -999.250 -999.300 '999,250 -999.250 '999,300 '999,250 '999,250 -999.300 -999.250 -999.250 '999,300 '999,250 '999,250 -999,300 -999,250 -999.250 -999 300 -999:250 -999,250 -999.$00 -999,250 LVP 009.H05 VERIFICATION DISTING PAGE 6 DRHO NCNb DEPT DRHO NCNb -999.250 NPHI -999.250 FCNb DEPT DRHO NCNb 8300.000 BP 999,300 GR :999.250 NPH1 -999,250 FCN[~ DEPT DRHO NCNb 8200.000 SP -999.300 GR -999.250 NPH! -999.250 FCN5 DEPT SFLU DRHO NCNb 8100 000 SP -999i~00 GR -999 250 NPHI -999 250 FCNb DEPT DRHO NCNb 8000.000 SP -999.300 GR -999,250 NPH1 -999,250 FCNb 7900.000 SP -999,300 GR 2999 250 NPHI 999:250 FCNb Dm. PT 7800,000 SP SFbO -999.300 GR DRHO -.999,250 NPHI NCNb 999.250 FCNb DEPT !700.000 SP SFLU 999,300 GR DRHO -999.250 NPH! NCNb -999.250 FCNb 7600.000 -999.300 GR 99.250 FCN;. DEPT DRHO NCNL 7500.000 SP '999,300 G~ -999,250 NPHI '999,250 FCNb DEPT SFbU DRHO NCNb DEPT 7400,000 SP SFLU -999.300 GA DRHO -999 250 NPHI NCNb -999:250 FCNb 7300.000 SP DEP~ -99925.000 RHOB -999,250 DT -999.300 IbD 105.688 GR -99925.000 RHOB -999,250 DT -999.300 98 312 GR -99925:000 RHOB -999.250 DT - 99,300 IbD 946,719 GR -99925.000 RHOB -999,250 DT -999.300 55.906 GR -99925.000 RHOB -999.250 DT -999,300 IbD 69.312 GR -99925.000 RMOB -999.250 DT -999.300 IbD 61,250 OR -99925.000 RHOB -999,250 D£ -999.300 60,500 GR -9~925,000 RHOB 999.250 DT -999.300 II.,D 53 7050 GR -99925:00 RHOB '999,250 DT -999.300 IbD 49 438 OR 999,250 DT '999 300 IbD 44!688 GR -99925 000 RHOB -999 250 DT -999.300 IUD '999,250 '999,300 i~99, so -999.300 '~99,250 ' 99,250 '999,300 999:300 -999.300 99,250 -999,300 -999.300 - 99 250 '999 300 -999.300 : 99. 50 '999,300 :999.300 999.250 -999.250 -999,300 '999,300 o -999.300 -999,300 -999,250 -999,250 -999.300 -999.300 -999,250 -999.250 -999,300 -999.300 NRAT NRAT IbM CAb! NRAT NRAT IbM CAD! NRAT IbM NRAT IbM NRAT CALI NRAT IbM CAbI NRAT IbM CAGI NRAT IbM CAb! NRAT IbM -999.250 9 . 50 - 99,250 -999 300 -~99. 50 99 -999,250 -999.300 O0 9 999.250 -999.300 -99 250 99 50 -999. 250 -999.300 -999,250 -999.250 '999,300 '999.250 '999.250 -999 300 '99 ,250 -999.300 LVP SFLU DRHO NCNb D£PT SFLU DRMO NCNb DEPT SFbU DRHO NCNb DEPT SFbU DRHO NCNb DEPT SFLU DRHO NCNb DEPT SFLU DRHO NCNb DEPT SFLU DRHO NCNb DEPT SFbU DRHO NCNb DEPT 8FLU DRHO NCNb D£PT SFLU DRHO NCNb DEPT SFbU DRHO NCNb 009.. HO5 VERIFICATION -999,300 GR -999,250 NPHI -999,250 FCNL 7200.000 SP -999.300 GR -999,250 NPHI -999.250 FCNb 7100.000 SP -999,300 GR -999,250 NPHI -999,250 FCNb 7000,000 -999.300 -999,250 NPHI -999.25U FCNL 6900,00O SP -999.300 GR -999.250 NPHI -999,250 FCNb 6800,000 SP -999.300 GR -999,250 NPH! -999,250 FCNb 700 000 SP -999. 250 FCNb 6600.000 SP -999,300 GR -999,250 NPHI -999,250 FCNL b500.O00 SP -999.300 OR -999.250 NPHI -999,250 FCNb 6400.000 SP -999.300 GR -999,250 NPH! -999,250 FCNL 6300,000 SP -999,300 GR -999,250 NPH! -999,250 FCNL 54 -99925 -999 -999 44 -99925 -999 -999 58 -99925 -999 -999 61 -99925 -999 -999 56 -99925 -999 -999 5~ -99925 -999 -999 69 -9~925 999 -999 46 -99925 -999 -999 54 -99925 '999 -999 41 -99925 -999 -999 39 -99925 -999 .656 .000 .250 .300 .875 .000 .250 .300 ,750 .000 ,250 .300 .875 .000 .250 .30O .938 .000 .250 .300 .375 ,000 .250 300 ,000 .250 .300 .000 .000 ,250 .300 .688 ,000 .250 .300 ,500 .000 .250 300 ,000 ,250 GR RHOB DT GR RHOB D~ GR RHOB DT GR RHOB DT IbD RHOB DT GR RHOB DT GR RHOB DT GR RHOB DT GR RHOB DT GR RHOB D~ GR RHOB DT -999,250 '999,250 '999,300 '999,300 '999.250 '999.250 '999.300 -999.30O -999,250 -999,250 -999.300 '999,300 -999.250 -999,250 -999,300 -999.300 -999,250 -999 25O -999:300 '999,300 : 9.2so 999,250 -999,300 :999,300 999,250 '999,250 '999,300 -999.300 :999 250 999.'250 -999,300 '999,300 '999,250 '999,250 '999,300 -999.300 '999,300 '.999,300 999,250 .-999,250 999,300 CALl NRAT CALI NRAT IbM CALI NRAT IbM CALI NRAT CALI NRAT IbM CALl NRAT IbM CALI NRAT CALI NRAT IbM CALI NRAT IbM CALI NRAT IbM CALl NRAT PAGE -999,250 -999,250 '999,300 -999,250 '999,250 :999!300 999 250 -999 250 -999.300 :999 250 999:250 :999 300 999:250 -999,250 -999,300 -999 250 30O -999,250 -999.300 :999 250 999:250 -999,300 -999.250 -999,250 '999.300 ,250 :999, O0 999.]50 '999,250 LVP 009.H05 VERIFICATION GISTING PAGE DEPT 6200.000 SP SFLU -999,300 G~ DRHO -999.250 NPHI NCNb -999,250 FCN~ -999.300 ILL 47.469 GR -99925.000 RHOB -999.250 DT DEPT ~100.000 SFLU 999.300 GR DRHO -999,250 NPHI NCNb -999.250 FCNL -999.300 I~D 57,219 GR -99925,000 RHOB -999,250 DT DEPT 6000,000 SP SFLU -999.300 G~ DRHO -999.250 NPHI NCNb -999.250 FCNu -999,300 Ifad 46 750 GR -99925:000 RHOB -999.250 DT DEPT 5900.000 BP SFbU -999,300 GR DRHO -999,250 NPHI NCNb -999.250 FCN~ -999.300 IbD 30.281 GR -99925,000 RHOB -999.250 DT DEPT 5800,000 SP SF~U _-999 300 GR DRHO -999:250 NPHI NCNb -999.250 FCNL -999.300 52.094 GR -99925.000 RHOB -999.250 DT DEPI 5700,000 SP SFLU -999.300 GR DRHO -999 250 NPHZ NCNE '999:250 FCNL -999.300 I~D 49,063 GR -99925,000 RHOB -999.250 DT DEPT 5600,000 SP SFLU -999.300 GR DRHO -999.250 NPHI NCNb -999,250 FCNb '999.300 24.703 GR -99925.000 RHOB -999.250 DT DEPT 5500,000 SP SF~U ~999,300 GR DRHO 999.250 NPHI NCNb 999.250 FCNL -999,300 34.750 GR -99.~25.000 RHOB 99,250 DT DEPT b400,O00 SFLU -999,300 GR DRHD -999,250 NPHI NCNb -999,250 FCN5 =999.300 XLD 3~.813 G~ -9992 .000 RHOB -999,250 DI DEPT 5300.000 SP SF~U -999,300 GR DRHO -999 250 NPHf NCNb -999~250 FCNL -999,~00 I~D 26. 72 GR -99925,000 RHO8 -999.250 DT DEPT 5200.000 SP SFbU -999,300 GR DRHO -999.250 NPHI NCNb -999.250 FCNb '999.300 I~D 39.656 GR -99925.000 RHOB -999.250 DT -999.300 99 0 -999,300 -999.300 -999,250 -999.250 -999,300 50 -999.300 -999 50 -999,300 :999, O0 999,~50 '999 250 -999:300 '999,300 '99 50 '999,300 9,~00 ,o '999,3250 '999. O0 '999.300 =999, 0 -999.]00 '99 O0 '999,250 -999.300 '999,300 '999,250 '999,250 '999,300 CA~I NRAT IU~ CALf NRA~ CALI NRAT CALl NRAT CALI NRAT CAlf NRAT CALf NRAT NRAT CALf NRAT CALI NRAT CALI NRAT -999.300 -999,,~50 -999, 50 O0 -999.250 999 300 5O !999,~00 999, 50 999,250 '999,300 -999. -999,~00 -999. 50 -999,250 -999.300 999, 50 -999. -999,250 -999.300 - . 50 -99 -999,250 '999,300 '999 250 ~VP O0~,H05 VERIFICATION DEPT 5100,000 SFSU -999,300 DRHO -999,250 N~HI NCN5 -999.250 FCNL DEPI 5000,000 SFSU -999,300 DRHO -999,250 NCNL -999,250 FCNL DEPT 4900.000 SP SFGU -999,300 GR DRHO .-999,250 NPHI NCNL 999,250 FCN[. DEPT 4800,000 SP SFLU -999.300 GR DRMO -999,250 NPHI NCNL -999,250 FCNL DEPT ~700 000 SP DRHO -999,250 N~HI NCNL -999,250 FCNL DEPT 4bO0,O00 SP SFLU -999.300 GR DRHO -999,250 NPHI NCNL -999,250 FCNL DEPT ~500 000 SP SFLU -999~300 GR DRHO -999.250 NPHI NCNL -999,250 FCNL DE:PT .4~00,000 SP SFLU 99.300 GR DRHO -999,250 NPHI NCNL -999.250 FCNL DEPT 4300 000 SP &FLU -999:300 GR DAHU -999,250 NPHI NCNL -999.25U FCNL D£PT 4200,000 SP SFbU -999,300 GR DRHD -999,250 NPHI NCNL -999.250 FCNL DEPT 4100,000 S~ 8FLU -999,300 GR DRHO -999,250 NPHI LISTING -999,300 48.188 -99925,000 -999.250 -999,300 43,125 -99925.000 -999,250 -999.300 48.094 925 000 -999.300 48.875 -99925.000 -999.250 -999.300 36.531 - 925.000 9-9999.250 '999.300 31.203 -99925.000 -999.250 -999,300 44.531 -99925,000 -999.250 -999,300 42.688 -99925.000 -999.250 -999 300 -99925.000 -999,250 -999 300 24:516 -99925,000 -999.250 -999.300 39.65b -99925.000 IUD DT GR RHOB DT IbD GR RHOB DT GR RHOB IbD GR RHOB DT ILD GR RHOB D? IbD RHOB DT GR RHOB DT IbD GR RHOB GR RHOB O~ GR RHOB 'v ~999 300 -999 250 '999,300 '999.250 '999.250 '999.300 :999 300 99,300 .250 '999,250 -999,300 999 300 999,250 -'999,300 -999,300 -999.250 -999,250 -999,300 -999.300 -999,250 -999,250 -999,300 -999,300 '999,i50 '999, 50 '999,300 '999, '999,250 '999,300 -999 300 -999,"250 -999,250 -999.300 -999,300 -999,250 -999,250 IbM CAbI NRAT IbM CALI NRA~ IbM CAbI NRAT IbM CALl NRAT IbM CAbI NRAT IbM CASI NRAT IbM CAbI NRAT IbM NRAT CALI NRAT IbM CAbI NRAT IbM CAb! NRAT PAGE :999,300 999.250 '999,250 '999,300 -999 250 -999:250 25O 999 250 999300 99 : 250 99~,250 -999.300 '999,250 '999,250 -999.300 -999,250 -999.250 -999,300 -999,250 -999,250 -999.300 -99~,250 -99 ,250 -999,300 -999.250 -999,250 -999.300 -999,250 -999,250 -999 300 -999,250 bVP 009.H05 VERIFICATION LISTING PAGE NCNb DEPT DRHO NCNb DEPT DRHO NCNb DEPT DRHO NCNb DEPT SFLU DRHO NCNb DEPT DRHO NCNb DEP~ DRHO NCNb DEPT SFbO DRHO NCNb DEPT SFLU DRHU NCNb DEPT DRHO NCNb DEPT SFbU DRHO NCNb DEPT -999,250 FCNb -999.250 DT 4000.000 SP -999,300 G~ -999.250 NPHI '999.250 FCNL -999.300 50.063 GR -99925.000 RHOB -999.250 DT 900.000 SP ~999.300 GR -999.250 NPHI -999.250 FCNL -999.300 IbD 45.906 GR - 925 000 RHOB 3800.000 SP -999.300 GR -999.250 NPHZ -999.250 FCNb -999.300 IbD 26.125 GR -99925.000 RHOB -999.250 DT 3700.000 SP -999.300 GR :999 250 NPH1 999.'250 FCNL - 300 ILD =999.250 DT 3600.000 '999.300 GR '999.250 NPHI '999.250 FCNb -999.300 IbD 31.219 GR -99925.000 RHOB -999.250 DT 3500.000 SP -999.300 GR '999.250 NPHI '999.250 FCNb -999.300 48.219 GR ooo 3400.000 SP -999.300 GR -999.250 NPH! -999.250 FCNb '999.300 IbD 41 063 GR -99925:000 RHOB -999.250 DT 3300.000 SP 999,300 GR -'999.250 NPHI -999.250 FCNb -999.300 fbD 34.125 GR -99925.000 RHOB -999,250 DT 3200.000 SP -999.300 GR -999.250 NPHI -999.250 FCNL -999.300 41 938 GR -99925:000 RHOB -999.250 DT 3100.000 SP -999.300 GR -999.250 NPHI -999.250 FCNL -999.300 IbD 53.312 GR -9.99925.000 RHOB 99.250 DT 3000.000 SP -999.300 G~ -999.300 43.406 '999.300 -999,300 999,~50 :999, 50 -999.300 :999.~00 999, 50 -999,300 '999,~50 '999. 50 '999,300 '9 O0 '999,~50 '999, O0 -999.300 '999,~50 '999. 50 '999,300 '999.~00 '999, 50 '999,~50 '999, 00 -999.300 -999, -999.300 2999, O0 999.~50 '999.250 '999.300 -999.300 -999.250 -999,250 -999,300 -999.300 -999,250 -999 50 -999:3200 9,250 IbM CAb[ NRAT IbM CAb! NRAT IbM CAb! NRAT IbM CAbI NRAT IbM CALI NRAT IbM CALI NRAT IbM CALI NRAT IbM CALI NRAT IbM CAbI NRAT NRAT IbM CALI -999,300 -999,250 -999,250 9:250 -999,250 '999.300 '999,2250 '999. 50 :999 O0 999:~50 '999,250 '999,300 '99 50 '999 300 -999!250 -999 250 -999 300 -99 i 250 -99c~ 250 -999 300 -999:250 -999.250 -999.300 -999,250 -999.250 -999 300 -999:250 '999,250 '999.300 '999.250 LVP 009,H05 VERIFICATION LISTING DRHO NCNb -999.250 NPHI -999.250 FCNL -99925 000 RHOB -999:250 DT DEPT SFbU DRHO NCNb 2900,000 SP -999,300 GR -999.250 NPHI -999.250 FCNL -999.300 49.063 GR -99925.000 RMOB -999,250 DT DEPT SFLU DRHO NCNb 2800,000 SP -999.300 GR -999.250 NPHI -999.250 FCNL -999.300 IbD 42,938 GR -99925,000 RHOB -999.250 DT DEPT 2700,000 SP -999,300 SFLU -999,300 GR 52,906 GR DRHO -999,250 NPHI -99925.000 RHOB NCNb -999.250 FCNL -999.250 DT D~.PT 2~00.000 S~ -999.300 Z~D s~Lo -999 300 ~R ~9.0~3 G~ '999:250 NPHI -9992S. 000 .HOB DRHO ** FILE TRAILER FILE NAME :EDIT ,001 SERVICE NAME VERSION # DATE : MAXIMUM LENGTH : 1024 FILE TYPE NEXT FILE NAME EOF ** TAPE TRAILER ** SERVICE NAME :EDIT DATE :81/ 9/ 4 ORIGIN : TAPE NAME :62120 CONTINOATION # :0! NEXT TAPE NAME : COMMENTS : ** REEL TRAILER SERVICE NAME :EDIT DATE :81/ 9/ 4 OR~GIN : REEL ~AME ~P,C.A.b. COMTINUATION NEXT REEL NAME COMMENTS : LIS FORMAT CUSTOMER TAPE -999,250 NRAT -999,300 -999,300 IbM -999.250 CALI -999.250 NRAT -999.300 -999,300 IbM -999,250 CALI -999,250 NRAT -999,300 -999 O0 IbM -999 250 NRAT -~:~oo -999.300 50 CALl -999,300 PAGE 11 '999,250 ~,999 300 9~9:2~o '999,250 -999.300 :9~.25o 999,250 -999 O0 -999,250 -999.300 -999,250 -999,250 LYP 009.H05 VERIFICATION blSTING PAGE 12 LIS TAPE VERIFICATION bI&TI~<NG LVP OIO.HO! VERIFICATION LISTING ** REEL HEADER SERVICE NAME :SERVIC DATE 182/09/22 ORIGIN : REEL NAME :REEL ID CONTINUATION # :01 PREVIOUS REEL COHHENTS :REEL COMMENTS *m TAPE HEADER ~* SERVICE NA~E :SERVIC DATE :82/09/22 ORIGIN :6560 TAPE NAME ~ C~NTINUATION # :0! PREVIOUS TAPE : COMMENTS :TAPE C[]M~ENTS ** FILE HEADER FILE NA~E :SERVIC,001 SERVICE NA~E : VERSION # DATE { ~AXI~UM LENGTH : 1024 r~bE TYPE PREVIOUS FILE ** INFORMATION RECORDS MNEM CONTENTS CN { SOHIO ALASKA PETROLEU~ CO WN { ¥-13 FN : PRUDHOE BAY RANG{ 13E TOWNS SECTI 33 COUN{ NORTH SLOPE STAT{ ALASKA CTRY: U,$,A, MNE~ CONTENTS 000 000 026 065 00 000 004 065 O0 000 0i2 065 00 000 004 00 000 004 0'65 00 000 002 065 O0 000 012 065 000 000 006 ooo UNIT TYPE CATE SIZE CODE PRES{ TDMOO1E 000 000 007 Ob5 $* COMMENTS ** LVP 010,HO1 VENIFICATION LISTING SCHLUMBERGER ALASKA COMPUTING CENTER COMPANY WMLL FIELD COUNTY STATE SnHIO PETROLEUM COMPANY Y-13 PRUDHOg BAY NORTH SLOPE BOROUGH AbAMKA ===============================================- .. .. ... . . ..~-================================. ... .. .... JOB NUMBER AT ACC: 65607 ~UN #1, DATE LOGGED: 12-SEP-82 BOTTOM DEPTH TOP DEPTH CASING TAILPIPE LINER TYPE FLUID FBUID LEVEL 11215 10215 FT. 9 5/8 IN. 10357 FT, 4,5 IN, 9939 FT, 7 IN. 11~88 FT PRODUCED FULl, LDP: JR TO SURF, LVP 010,H01 VERIFICATION I, ISTING PAGE ** DATA FORMAT RECORD ** ENTRY BLOCKS TYPE SIZE REPR COD~ ENTRY 4 1 ' 66 9 4 65 ,lin 0 1 66 0 DATUM SPECIFICATION BLOCKS MNE~ SERVICE SERVICE UNiT API APl API API FiLE SiZE PROCESS SAMPLE REPR ID ORDER # LOG TYPE CLASS DgPT FI 0 0 0 SIG. PSi CU 0 40 1 FSIG PS1 0 0 0 TRAT PSl 0 42 GR PS1 GAP1 0 31 3~ BACK PS, CPS 0 0 O FBAC PS! CPS O 0 0 NTDT PS,, CPS 0 0 0 FTDT PS1 CPS 0 0 0 SIGM PS2 CU 0 40 FSIG PS2 0 0 ~ TRAT PS2 0 42 1 GR PS2 GAPI 0 31 32 BACK PS2 CPS 0 0 0 FBAC PS2 CPS 0 0 0 NTDT P$2 CPS 0 0 0 FTDT PS2 CPS o 0 0 $IGM PS3 CU 0 40 1 FSIG PS3 0 0 0 TRAT PS3 0 42 TRAT .S4 0 42 o o o o I 6.8 0 oo i o° i o t 6:8 0 68 0 ~ 68 0 0 ~ 0 0 I 68 0 I 68 0 ~ 68 0 68 68 LVP OiO.H01VENIFICATJON LISTING BACK PS5 CPS 0 FBAC PS5 CPS 0 NTDT P$5 CPS 0 FTDT PS5 CPS 0 0 0 0 0 0 0 0 0 o o o 0 o o 0 o 4 0 ! 6B i 68 DEPT GR FTDT GR FTDT GR FTDT FTDT GR FTDT 11259.0000 SIG~{ 55 1562 BACK -24 6563 SIG~ -999 -999 -999 -999 -999 -999 -999 -999 2500 BACK 2500 S]G~ 2500 BACK 2500 SIG~ 2500 BACK 2500 SIG~ 2500 BACK 2500 DEPT GR FTDT GR FTDT GR FTDT OR FTDT OR FTDT 11200.0000 StGk 59 3125 BACK 139 7500 $IGM 61 90 102 lO0 105 94 131 938 BACK 375 SIGk 0801 BACK 8437 1875 BACK 3955 2500 BACK 9453 DEPT OR FTDT OR FTDT OR FTDT GR FTDT GR FTDT 1]100 0000 SIG~ 113 28 122 49 121 56 121 8437 BACK 5625 SIGM 7969 BACK 6250 SJG~ 2671 BACK 7891 SIGM 1094 BACK 5781 SIGM 6465 BACK 5000 DEPT FTDT GR FTDT FTDT FTDT ILO00 0000 SIGN 76 3125 BACK 183 3750 SIG~ 10] 1875 BACK 173 1250 StGM 88 5000 BACK 166 6250 SIG~ 81 0625 BACK 170 7500 SIG~ 90 1875 BAC~ 40,9375 FSIG ]5. 500 FSiG .909.~000 FBAC -999, 500 FSIG .999.~500 FBAC -999.2500 ,~BAC -999.2500 -999.~500 FBAC -99g. 500 FSIG -999.2500 FBAC 5.2187 FSIG 43. 37 F$iG 45. FSIG FBAC 3. FSiG 133.0000 FB.C 18.578i FSIG 52, ~a ' 1 36~ FSiG 1 27 , FSIG 127,5625 FBAC 28 6719 FSiG 24. FSiG FSi~ 162,3750 FBAC -184.7500 TEAT T~? '999 2500 NTDT 39.9687 TEAT TRAT 45.,218 NTDT 37;447] TEAT 6~.054 ~NTDT 38,468~ TEAT 61,-0i17 N~DT 39,6973 TEAT 60.8750 NTDT 17 ,4375 TEAT ,2500 TEAT .6665 TEAT 13976 TEAT ~,027~ NTDT ~7695 TEAT ~750 NTDT 27,0156 TEAT 29'9687 TEAT 62.,59~8 NTDT 3"X;2344 TEAT *875 NTDT ~,7500 T~AT 9~,25,00 NTDT 24'3281 T9AT 8~,8750 NTDT -116.7500 - 2 4, :656. 3 999,25'00 999:~ 2500 "999~ 2500 -999', -999,2500 .999; 2500 999' 2500 3 4883 174 8437 746i ,.:6:~ 65~4 7i5i 34'38 125:0 0742 ~2.50 ~25'8 6606 15.b2 I7~, 6895 bVP 010,HO1 VERIFICATION LISTING FTDT t67,6250 D£PT 10900 G~ t2 FTDT GR 19 FTDT 101 GR 28 FTDT 124 GR 29 FTDT 132 GR 36 FTDT 135 000o $IGM 8359 BACK 1250 SIGn 4063 BACK 5000 $IG~ 7188 BACK 9375 SIGH 9375 BACK 4609 $1G~ 5625 BACK 8535 17.203t 76 875 t8:~594 108.0000 18,5469 125,7500 17,0659 127,~47 i8. 225 127,9375 DEPT 10800 FTDT 108 FTDT 101 OR 34 FTDT 107 GR 39 FTDT 101 GR 42 FTDT 102 0000 SIG~ 0000 BACK 6875 SIGM 9687 BACK 1250 8IGM 4922 BACK 1250 Sl6~ 4688 BACK 5625 $IG~ 5469 BACK 5625 18.2031 85.0000 18,8447 113,5625 19.2715 123,~500 18. 334 126.3750 18.9062 134,0000 DEPT 10700 FTDT 107 G~ 23 ~TDT 124 GR 25 ~TDT 120 FTDT 115 G~ 36 FTDT 119 0000 SIG~ 1250 BACK 6250 SIGg 5625 BACK 1875 SIG~ 9219 BACK 3750 SIG~ 4375 BACK 3750 SIGM 6875 BAC~ 6250 !7,4688 86 6250 17 9844 3594 125 5625 18,1719 1~8.5000 8.0625 126,8750 DEPT 10600 OR 24 FTDT 132 GR 31 FTDT 125 GR 40 FTDT 131 OR 42 FTDT 142 OR 45 FTDT 134 0000 $IG~ 0156 BACK 2500 SIGP 5566 BACK 6250 8750 BACK 6250 SIG~ 2500 BACK 0078 SIG~ 1230 BACK 2969 18.3125 100,~250 18, 487 t2~ 4453 1 8594 ooo 1 490 134 0000 17 6406 137 0000 DEPT 10500 GR 73 FTDT 154 GR 84 0000 $IG~ ,9375 BACK .1250 ,1406 BACK 25.3281 108,56 132.1719 FSIG FBAC FSIG ~AC ~SXG FBAC FSIG FBAC FSIG FSAC FSlG SAC SAC FBAC FSIG 8AC 'BAC F8AC ~s~¢ FBAC FSIG FBAC FSIG FBAC FSiG FBAC FSIG FBAC FSiG FBAC 15,4219 30,92t9 i6,1250 44,4375 15,4609 52,6250 i5.3944 5'3505 55.~250 161719 '6 25.00 6 OO88 54. 3750 15,6875 15. 09 ;5234 i5',0234 i4;9609 52,8437 15.2656 82,3750 16;0723 5;4063 9:~43500 1~;9536 i'5;2061 !07,~125 21.0313 50:00 7 6 5:6 8379 TRAT NTDT T~AT N ~DT T~AT N ~ DT T~AT NTDT TRAT NTDT TRAT TDT ~AT NTDT TRAT TNTDT TNTDT NTDT TRAT NTDT TRAT TDTRAT NTDT TRAT NTDT TRAT TDT RAT NTDT :PAGE 2 4395 1072937488~ 128 1172 7402 a7.5o 99i2 0313 8838 9531 9279 ~4.06 ~6973 0 O00 2.8848 ! I 0 i ~'5!00 2; 8066 ! 37,0000 '2,8281 t ~0 ;, ~500 2;9023 · I 24,062:5 2; 869i 14,0, 0000 2,~555 ~8., 2500 2; 8738 43,8~.50 228848 ~5~ 7500 2' 83'37 32, ~50~ 2;9048 45, ~ 57 8 3.080i 7. 2 ~,oo 03~3 LVP 010,H01 VERIFICATION LISTING PAGE 6 FTDT 163.1250 SIG~ OR 89,7500 BACK FTDT 150.7500 SIGM OR 88.5625 BACK FTDT 157,5625 SIG~, GR 90,5000 BACK FTDT 181.2500 DEPT GR 51 FTD7 162 GR 67 FTDT 153 GR 72 FTDT 152 GR 73 FTDT 161 OR 76 FTDT 149 DEPT GE 6O FTDT 145 OR 70 FTDT 139 GR 8O FTDT 124 GR 87 FTDT GR 87 FTDT 149 DEPT GE -999 FTDT -999 OR 72 FTDT 140 GR '999 FTDT -999 OR -999 FTDT -999 OR -999 FTDT -999 10400 0000 5313 BACK 2500 SIGM 2422 BACK 7500 SIG~ 1250 BACK 7500 SIG~ 1250 BACK 6563 SIG~ 5488 BACK 4395 10300 0000 $IGM 5938 BACK 5000 SIG~ 6094 BACK 9609 2988 BACK 5625 SIGH 5625 BACK 2500 SIGM 3203 BACK 343~ 10247 5000 25.1250 FSiG 141,2500 fBAC 25,4248 FSIG 1'~7 0 . FSIG 146,3750 FBAC 23 4531 FSIG 127 ~SZO 14! 625 FBAC 22 953~ FSIG 1~8 0000 :FBAC 1 5513 FSIG 138 FBAC 76 FSIG 151,2500 FBAC 43.2813 FSIG I~.3750 FBAC 14 ,0967 FSIG 1~7 .555 13t oooo 42 ]875 133 2500 41 1328 FSIG 135 9844 FBAC -999,2500 F$IG 2500 BACK -999,2500 2500 SIGM 44,2813 43 75 BACK 123,06~5 FBA~ 2500 BACK -999,2500 FBAC 2500 SIG~ -999.2500 2500 BACK -999,2500 FBAC 2500 SIG~ -999,2500 2500 BACK -999,2500 FBAC 2500 ** FILE TRAIbER ** FILE NAiF :SMRVIC,O01 SERVICE NAME : VERSION # t DATE { MAXIMUM LENGTH : 1024 FILE TYPE I NEXT FILE NAME : 21,6563 fEAT 109,9375 NTDT 21,8099 TEAT 29~9 TRAT 3750 NTDT 18,7500 TEAT IO9'56 5 NTDT 18.85~4 TEAT [8,044 TEAT 11,2,0000 NTDT i8.2424 TEAT 121,3145 41,3125 TRAT 90',2500 40,8530 TEAT 9,'1,8,750 NTDT 38,5938 TEAT {:':;4063 TEAT ~00'187§ N~iD'T 40;5306 TEAT !02,9307 '999 2500 TRAT 78!3 TEAT 2500 TRAT 2500 N?DT 25OO TEAT 2500 NTDT 2500 TEAT 12500 NTDT 3,1797 148,0000 15 0000 7539 180:7500 8867 9238 $750 8706 18~,~,7~,3~908 163~2734 5 6797 28~ 5000 5504 24~ $~59 · 7305 7500 27i 7500 7847 26b:~, 31i~35 ~999,2500 2500 .25{, 6:250 999,2500 -999,2500 -999.25"00 ' 999, 2'5!00 -999~2500 -999, 2500 bVP OIO,M01 VERIFICATION {,ISTING ********** EOF ********** ** TAPE TRAILER ** SERVICE NAME :$ERVIC DATE :82/09/22 ORIGIN :6560 TAPE NA~E : CONTINUATION # :01 NEXT TAPE NAME : COMMENTS :TAPE COMMENTS ** REEL TRAILER ** $~RVICE NAME :SERVIC DATE 182/09/22 ORIGJN I REEL NAME :REEL ID CONTINUATION # :01 NEXT RE~L NAME COMMENTS :REEL COMMENTS ********** EOF ********** ********** ~OF *~********