WELL COMPLETION OR RECOMPLETION REPORT AND LOG
No. of Completions
1 a. Well Status: 0 Oil 0 Gas 0 Plugged III Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
DIL 1 BHCS 1 GR 1 SP, FDC 1 CNL 1 GR 1 CAL, RFT
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
lOP BOTTOM lOP BOTTOM SIZE
Surface 110' Surface 110' 361'
Surface 26891 Surface 26891 17-1/2"
Surface 8917' Surface 8671' 12-1/4"
8419' 9915' 8169' 9668' 8-1/2"
0 GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1250' SNL, 4732' WEL, SEC. 34, T11 N, R13E, UM
Top of Productive Horizon:
1511 NSL, 5145' WEL, SEC. 27, T11N, R13E, UM
Total Depth:
188' NSL, 5140' WEL, SEC. 27, T11N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 645361 y- 5949016 Zone- ASP4
TPI: x- 644918 y- 5950409 Zone- ASP4
Total Depth: x- 644922 y- 5950446 Zone- ASP4
18. Directional Survey 0 Yes III No
22.
CASING
SIZE
20" X 30"
13-3/8"
9-518"
WT. PER FT.
Insulated
72#
47#
29#
GRADE
Conductor
L-80
L-80
L-80
7"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
26.
Date First Production:
Not on Injection
Date of Test Hours Tested
27.
Zero Other
5. Date Comp., Susp., or Aband.
11/18/2004
6. Date Spudded
06/30/1980
7. Date T.D. Reached
07/29/1980
8. KB Elevation (ft):
80.6'
9. Plug Back Depth (MD+ TVD)
9240 + 8994
10. Total Depth (MD+ TVD)
9915 + 9668
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
NI A MSL
24.
SIZE
4-1/2", 12.6#, L-80
TVD
Ft
1b. Well Class:
0 Development 0 Exploratory
0 Stratigraphic III Service
12. Permit to Drill Number
179-088 304-409
13. API Number
50- 029-20411-00-00
14. Well ~l:@ Number:
15. Field I P~~s): ~~I"\
Ala. Prudho'é~ li~ I?pru~~ay
.~¡l &, 'OOS
Gas I}
~, OIls f!
16. property'~tion~rl1111iSSi
- AòLU~8287 V/1
17. Land Use Permit:
Ft
20. Thickness of Permafrost
1900' (Approx.)
CEMENTING RECORD
10 cu yds Concrete
3720 cu ft Permafrost II
1225 cu ft Class 'G', 133 cu ft PF
401 cu ft Class 'G'
AMOUNT
PULLED
TUBING RECORD
DEPTH SET (MD)
8250' - 84651
PACKER SET (MD)
8374'
ACI[),F~CTl-!R~, CEMENT SaUEEZE, ETC.
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
DEPTH INTERVAL (MD)
8755'
8206'
AMOUNT & KIND OF MATERIAL USED
P&A wI 25 Bbls Class 'G' Cement
Set EZSV with Whipstock on Top
GAs-McF
WATER-BBl
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
PRODUCTION FOR Oil -BBl
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + Oil -BBl
Press. 24-HoUR RATE
GAs-McF
W ATER-BBl
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
".(':r \.ì~\i-'F'~': r '\ 111 2 f) 2005
~l.:>',f.4\hL"t;.L, vh!\',~' U ',' '"
None
f. .\1
.'"
28.
)
GEOLOGIC MARKERS
29.
)
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
9077'
8831'
None
Shublik
9103'
8857'
Ivishak
9183'
8937'
30. List of Attachments: Summary of Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble ~. b"Å~ Title Technical Assistant Date Of. (7 .()<)
PBU Y -03 179-088 304-409 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No.1 Approval No. Drilling Engineer: Jim Smith, 564-5773
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 18: Classification of Service Wells: Gas Injection. Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal. Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1. and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing. Gas Lift. Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Submit Original Only
')
)
Well:
Field:
API:
Permit:
Y -03A
Prudhoe Bay Unit
50-029-20411-01-00
204-235
Accept:
Spud:
Release:
Rig:
12/04/04
12/08/04
12/17/04
Nabors 2ES
PRE-RIG WORK
11/09/04
PULLED 41/2" PXN FROM 8378' SLM. D&T WI 3.70" CENT., T.E.L., BAILER. TT @ 8,433' SLM. TAG TD @
9,138' (+25' = 9163' ELM). SAMPLE BAILER WAS EMPTY. RDMO. P/T'D TREE CAP, NORMAL UP SSV, LEFT
WELL SHUT-IN.
11/17/04
MU 2' BDN (LARGE NOZZLE). KILL WELL WITH 213 BBLS 1% KCL. LINE UP FLUID PACK IA.
11/18/04
COMPLETE FREEZE PROTECT TO 2000' WITH 60/40 MEOH ON IA. RIH WITH 2" BD NOZZLE AND KILL
WELL WITH 273 BBLS 1% KCL. P&A PERFS WITH 25 BBLS -15.8 PPG CLASS 'G' CMT. BUMP WHP TO
320PSI. CONTAMINATE TO 8750'. POH WASH TBG CUT AREA 8250' 2X, JEWLRY AND TREE. TRAP 285
PSI ON WHo RDMO. NOTIFY PCC I PO OF WELL SHUT IN STATUS. JOB COMPLETE.
11/19/04
DRIFT WI 3.70" CENT, TEL, SAMPLE BAILER LOC TT @ 8456' SLM + 8' CORR = 8464' MD. TAG TOC @ 8755'
CORR MD. PT CMT TO 2000 PSI FOR 15 MIN (GOOD TEST). TAGGED TOC AGAIN @ 8755' CORR MD.
NOTIFY PAD OP, WELL LEFT SI.
11/21/04
TUBING PUNCH SMALL CHARGE SHOT FROM 8225'-8227', STRING SHOT FROM 8240' - 8252' 2 STRAND.
11/23/04
FIRED 3 318" CHEMICAL CUTTER AT 8250'.
")
-)
Page 1 ..
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y -03A
Y -03A
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Date
From - To Hours Task Code NPT Phase
11/29/2004 15:00 - 21 :00
6.00 MOB
P
PRE
21 :00 - 00:00
11/30/2004 00:00 - 22:00
3.00 MOB
22.00 MOB
P
P
PRE
PRE
22:00 - 00:00 2.00 MOB N WAIT PRE
12/1/2004 00:00 - 00:00 24.00 MOB N WAIT PRE
12/2/2004 00:00 - 00:00 24.00 MOB N WAIT PRE
12/3/2004 00:00 - 16:00 16.00 MOB N WAIT PRE
16:00 - 00:00 8.00 MOB N WAIT PRE
12/4/2004 00:00 - 07:30 7.50 MOB N WAIT PRE
07:30 - 14:00 6.50 RIGU P PRE
14:00 - 15:30
DECaMP
1 .50 DHB
P
15:30 - 20:00
4.50 WHSUR P
DECaMP
20:00 - 20:30 0.50 DHB P DECaMP
20:30 - 22:00 1.50 WHSUR P DECaMP
22:00 - 00:00 2.00 BOPSUF P DECaMP
12/5/2004 00:00 - 00:30 0.50 BOPSUPP DECaMP
00:30 - 04:30 4.00 BOPSUF P DECaMP
Start: 11/29/2004
Rig Release: 12/17/2004
Rig Number:
Spud Date: 11/15/2004
End: 12/18/2004
Description of Operations
Blow Down And Disconnect Utilities Between Pit Complex And
Sub Base - Move Cuttings Tank - Lower Cattle Shoot - Lay
Mast Over And Pull Sub Base Off Of Well - Have Pre-Job
Safety Meeting With Security, CPS, And Rig Team
Pull sub base off well and transport sub base to V-Pad
Move Sub Base, pits, camp and equipment From OS 05-24 To
Y -03A
Note: All rig equipment on location at 22:00 hrs on 11/30/04
Standing by on Y Pad. Wait on weather/winds to improve to
remove well houses and flow lines allowing rig access to
Y -03A.
Standing by with crews on Y Pad. Wait on weather/winds to
improve to remove well houses, snow and flow lines allowing
rig access to Y -03A. Raise derrick and prep rig floor.
Standing by with crews on Y Pad. Wait on weather/winds to
improve to remove well houses, snow and flow lines allowing
rig access to Y -03A.
Standing by with crews on Y Pad. Wait on weather/winds to
improve to remove well houses, snow and flow lines allowing
rig access to Y -03A.
Well houses removed. Removing flow lines. Clearing snow
from area.
Removing flow lines. Clearing snow from area.
Lay Herculite And Spot Sub Base Over Well - Rig Up Rig Floor.
Lay Herculite And Position Pit Complex - Hook Up Utilities.
Position Pit Complex - Spot Truck Shop And Welding Shop -
Hook Up Utilities And Service Lines From Sub Base To Pit
Complex - Set Cutting Tank And Berm
*NOTE* Rig Accepted For Well Work On Y-03A At 14:00 On
12-04-2004
Hold Pre-Spud And Environmental Meeting With All Personal
Regarding Y-03A Well Operations. Rig Up DSM And Pull BPV
Held PJSM - Rig Up Circulating Lines And Circulate Out
Freeze Protection To Cuttings Tank From Tubing. Switch
Lines and Pump 40 BBLS Soap Down Tubing At 6 BPM, 850
PSI. Confirm Well Is Dead.
Install TWC valve and test from below to 1,000 psi. Good Test.
Blow down all lines.
Nipple down tree and adapter flange. Secure tree in cellar.
Check threads on tubing hanger
Held PJSM - Nipple Up BOP And Related Equipment
Held PJSM - Nipple Up BOP And Related Equipment
Hold Pre-Job Safety Meeting -Install Test Plug - Rig Up
Testing Equipment - Test BOP And Related Equipment-
Witness Of BOP Test Waived By AOGCC Inspector Chuck
Scheve - Test Upper And Lower Pipe Rams, Blind Rams,
Manual And HCR Valves On Choke And Kill Lines, Choke
Manifold, Floor Safety Valve, Dart Valve, Top Drive Upper And
Lower IBOP Valves At 250 Psi. Low And 4,000 Psi. High - Test
Annular At 250 Psi Low And 3,500 Psi High - Rig Down Testing
Equipment
Printed: 12/27/2004 8:57:37 AM
)
)
Page 2 .
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y -03A
Y -03A
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Hours I Task Code NPT
Phase
Date
From - To
12/5/2004
1.00 WHSUR P
04:30 - 05:30
DECaMP
05:30 - 06:30
1.00 PULL P
DECOMP
06:30 . 07:30 1.00 PULL P
07:30 - 10:30 3.00 PULL P
10:30 - 17:00 6.50 PULL P
DECaMP
DECOMP
DECOMP
17:00 - 18:30
1.50 DHB
P
DECOMP
18:30 - 20:30
2.00 DHB
P
DECOMP
20:30 - 23:30 3.00 DHB P DECOMP
23:30 - 00:00 0.50 DHB P DECOMP
12/6/2004 00:00 . 02:00 2.00 DHB P DECOMP
02:00 - 03:00 1.00 DHB P DECOMP
03:00 - 05:00 2.00 DHB P DECOMP
05:00 - 05:30 0.50 DHB P DECOMP
05:30 - 06:00 0.50 DHB P DECOMP
06:00 - 10:00 4.00 STWHIP P WEXIT
10:00 - 11 :30 1.50 STWHIP N RREP WEXIT
11 :30 - 16:00 4.50 STWHIP P WEXIT
16:00 - 17:00 1.00 STWHIP N RREP WEXIT
17:00 - 19:00 2.00 STWHIP P WEXIT
Start: 11/29/2004
Rig Release: 12/17/2004
Rig Number:
Spud Date: 11/15/2004
End: 12/18/2004
Description of Operations
Held PJSM . Rig Up DSM Lubricator - Pull TWC - Rig Down
And Clear Rig Floor
Make Up Landing Joint And Crossovers. Back out lock down
screws. Pull tubing hanger to rig floor. Pulled free with 145K
up weight. Lay down hanger.
PJSM. Rig up tubing equipment. Rig up control line spooler.
Pull out and lay down 4.5", 12.6# tubing from 8,250' to 6,210'.
Lay down SSSV. Rig down control line spooler. Recovered 3
SS bands and 25 clamps.
Continue POH laying down tubing from 6,210' to surface.
*NOTE* Items Recovered During Decompletion:
1 Tubing Hanger And Pup
3 Stainless Steel Bands
25 Clamps - 25 Pins
197 Joints Of 4 1/2" Tubing
4 GLM With Pup Joints Top And Bottom
1 SSSV With Pup Joints Top And Bottom
1 Cut Off Joint 18.95' Long
Clear and clean rig floor.
Rig up Sch. wireline. 8.5" gauge ring would not make up to
adapter ring. Investigated and found incompatible threads. No
other parts on location.
Made up and set test joint and tested top and bottom rams to
250 psi low by 4,000 psi high. Tested annular to 250 psi low
and 3,500 psi high. Good test. Ran wear bushing and lay
down test equipment. Note: Schlumberger to get proper
threaded gauge ring from their shop.)
PJSM. Make up 8.54" GR with JB and CCL. RIH to tag at
8,244' WLM. Collar located at 8,210' WLM. POOH.
Junk basket loaded with scale and remnants of control line
encapsulation material. Clean out and re-run GR/JB/CCL.
Continue RIH with GRlJB/CCL. Tag up at 8,239'. Collar
verified at 8,210' WLM. POOH with wireline. JB contained
small amount of scale and encapsulation debris.
Lay down GR BHA. Held PJSM. MU 9-5/8" 47# casing EZSV
and setting tools.
RIH With GR-CCL And Haliburton EZSV Packer And Set Top
Of EZSV At 8,206' WLM - Positive Surface Indication Of
Packer Setting - RtH Tag EZSV Confirm Setting Depth - POH
With Logging Tools
Rig down Schlumberger wireline equipment. Clean and clear
rig floor.
Pressure test the 9-5/8" casing to 4,000 psi against the EZSV
for 30 minutes.
PJSM. Pick up whipstock assembly. Make up BHA to 1,001'.
Change out elevators. Pick up one joint of drill pipe and break
circulation. Blow down TDS.
Troubleshoot TDS brake.
Pick up drill pipe from pipe shed from 1,001' to 6,141'.
Replace master cylinder on TDS.
Continue picking up drill pipe from pipe shed from 6,141' to
Printed: 12/27/2004 8:57:37 AM
.. I\.
')
')
BP EXPLORATION
Operations Summary Report
Page 3~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y -03A
Y -03A
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 11/29/2004
Rig Release: 12/17/2004
Rig Number:
Spud Date: 11/15/2004
End: 12/18/2004
Date From - To Hours Task Code NPT Phase Description of Operations
12/6/2004 17:00 - 19:00 2.00 STWHIP' P WEXIT 8,164'.
19:00 - 21 :00 2.00 STWHIP P WEXIT Rig up wireline.
21 :00 - 23:00 2.00 STWHIP P WEXIT Make up Gyrodata tools and run in hole on wire line to 8,207'.
String Weight Up 205,000#, String Weight Down 180,000#-
Worked String To Orient Whipstock. Slacked Off And Tripped
Anchor With 20,000# - Whipstock Set At 45 Degrees - Picked
Up On String 10,000# Above Neutral Weight to Verify That
Whipstock Set. Slacked Off 40,000# To Shear Retaining Bolt.
*NOTE* Tagged Bridge Plug With Bottom Of Whipstock At
8,207' (DPM)
I Top of Whipstock @ 8,184' MD
¡
23:00 - 00:00 1.00 STWHIPI P WEXIT POOH with wireline. Lay down Gyrodata tools and rig down
0.50 STWHIPI P wireline.
12fi /2004 00:00 - 00:30 WEXIT Complete rigging down Schlumberger wireline.
I
00:30 - 01 :30 1.00 STWHIP¡P WEXIT Held PJSM With Truck Drivers, Drilling Crews, And Service
Personnel Regarding Mud Displacement - Pumped 15 Barrel
i Hi-Vis Spacer Followed Up With 539 BBLS 10.6 PPG LSND
! Mud At 12 BPM With 1,700 Psi.
I
01 :30 - 12:00 10.50 STWHIPI P WEXIT Recorded Slow Pump Rates w/ New Mud System. Milli window
in 9-5/8" casing from 8,184' to 8,200'. Drill new formation to
I 8,216'. Work pipe across window, pump sweep and clean the
I hole. Recovered - 200# of metal.
I
!
Top of window at 8,184'
Bottom of window at 8,200'
12:00 - 12:30 0.50 STWHIP P WEXIT Perform FIT to 12 ppg EMW with 580 psi surface pressure and
10.6 ppg fluid - good test.
12:30 - 13:00 0.50 STWHIP P WEXIT Flow check the well - stable. Pump dry job.
13:00 - 15:30 2.50 STWHIP P WEXIT POH standing back 4" DP from 8,216' to top of BHA @ 1,001'.
15:30 - 19:30 4.00 STWHIP P WEXIT Stand back DC's and HWDP. LD mills. Clean under rotary
1 table. Pull wear ring. Flush the stack. Blow down all surface
lines. Run wear ring. Clear floor.
19:30 - 22:30 3.00 STWHIP P WEXIT MU 8-1/2" Drilling BHA. MU bit, motor and MWD/LWD. Orient
and upload tools. Set UBHO and test MWD/LWD - good. PU
flex collars and remaining BHA to 1,172'.
8-1/2" Drilling BHA - 8-1/2" Hughes HCM 0912 RR/RB, 7"
SperryDrill - 7/8 - 6 stg, non-mag float sub, 6-3/4" GR, 6-3/4"
OM HOC, 6-3/4" TM HOC, non-mag UBHO sub, 3 x non-mag
flex collars, 9 x drill collars, 5 x HWDP, jar, 18 x HWDP, xo.
22:30 - 23:00 0.50 STWHIP P WEXIT PU 4" DP from 1,172' to 2,104'.
23:00 - 00:00 1.00 STWHIP P WEXIT Slip and cut drilling line.
12/8/2004 00:00 - 01 :00 1.00 STWHIP P WEXIT Service top drive and brakes.
01 :00 - 03:00 2.00 STWHIP P WEXIT RIH w/4" DP from 2,104' to 8,134'.
03:00 - 03:30 0.50 STWHIP¡ P WEXIT Install blower hose. Orient and slide through window with
pumps off to 8,205'. Ream undergauge hole from 8,205' to
8,216'.
03:30 - 00:00 20.50 DRILL P INT1 Directional drill from 8,216' to 9,150'. AST - 12.56, ART - 2.88.
PU - 215K, SO - 175K, ROT - 195K, TO on - 9k, TO off - 8k
12/9/2004 00:00 - 02:00 2.00 DRILL P INT1 Directional drill from 9,150' to 9,248' (TO). PU - 215K, SO-
175K, ROT - 195K, TO on - 9k, TO off - 8k.
02:00 - 04:00 2.00 DRILL P INT1 Circulate bottoms up for samples. Circulate hi-vise sweep and
clean up the hole prior to short trip. Monitor well - stable.
Printed: 12/27/2004 8:57:37 AM
~~fÆ7E :'} !ÆifÆ~~fÆ /
ATfASIiA. OIL AND GAS /
CONSERVATION COMMISSION
FRANK H. MURKOWSK/, GOVERNOR
333 W. pi AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907)276-7542
.~
\1q- Dß
Bill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay Y -03
Sundry Number: 304-409
Dear Mr. Isaacson:
Enclosed is the approved Application for Sundry Approval relating to the above-
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this decision,
or such further time as the Commission grants for good cause shown, a person
affected by it may file with the Commission an application for rehearing. A
request for rehearing is considered timely if it is received by 4:30 PM on the 23rd
day following the date of this-letter, or the next working day if the 23rd day falls
on a holiday or weekend. A person may not appeal a Commission decision to
Superior Court unless rehearing has been requested.
,
BY ORDER OF JJIE COMMISSION
DATED this12- day of November, 2004
Encl.
SCANNEt,~ NO\; n 2DDl!
W6/1r
) STATE OF ALASKA )
ALASKA Oil AND GAS CONSERVATION COMMISSION 0
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request:
II Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate
0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver
0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
0 Other
0 Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
99519-6612
80.6'
4. Current Well Class:
0 Development 0 Exploratory
0 Stratigraphic 181 ~rvice
5. Permit To Drill Number
179-088 ,/
6. API Number: /'
50- 029-20411-00-00
9. Well Name and Number:
PBU Y-03 /
ADL 028287
10. Field I Pool(s):
Prudhoe Bay Field I Prudhoe Bay Pool
PRE$I;NI¡VVEU:.CqNDITIQN¡$UMMABX " , '.
Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured):
9240 8994 9240
. MD . NO Bûrst
8. Property Designation:
11. ,
Total Depth MD (ft):
9915
G<ising
Structural
Conductor
Surface
Intermediate
Production
Liner
Total Depth TVD (ft):
9668
LêngJh
Size
Junk (measured):
None
Cóll<ipse:
110' 20" x 30" 110' 110'
2670' 13-3/8" 2670' 2670' 5380 2670
8917' 9-5/8" 8917' 8671' 6870 4760
1500' 7" 8419' - 9915' 8169' - 9668' 8160 7020
Perforation Depth MD (ft): Perforation Depth TVD (ft):
9077' - 9238' 8831' - 8992'
Packers and SSSV Type: 9-5/8" GUIB Polar packer;
Otis BVN SSSV Landing Nipple
Tubing Size:
4-1/2", 12.6#
Tubing Grade:
L-80
Packers and SSSV MD (ft): 8374'
2034'
Tubing MD (ft):
8465'
12. Attachments:
181 Description Summary of Proposal 0 BOP Sketch
0 Detailed Operations Program
14. Estimated Date for /1 15. Well Status after proposed work:
Commencing Operations: November 10, 2004 0 Oil 0 Gas 0 Plugged
16. Verbal Approval: Date: 0 WAG 0 GINJ 0 WINJ
Commission Representative: '
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Bill Isaacson Title Senior Drilling Engineer
Signature Lj.Jl. 1. ~--c.' Phone 564-5521 Date 1\/5/0""
Commission Use Only
13. Well Class after proposed work: /
0 Exploratory 0 Development 181 Service
181 Abandoned
0 WDSPL
Contact Jim Smith, 564-5773
Prepared By Name/Number:
Terrie Hubble, 564-4628
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number: 3p~ 4t:J9
0 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test
l-eSf- ßofE fc 4oC?O pt/, .
Other: Â-i) pw J.td Ç&,,, ~ !O -, {o ( Ni~ ì.U hPJ ~",.
0 Location Clearance
~ ~. Jv -fy ¡,.~JL ~~4 t( ~ - 0 5 A '
S~ANNED NOv.!
lDD4
COMMISSIONER
APPROVED BY
THE COMMISSION
Date 1f~ ~icate
RBDMS BFL NOV - 8 2004
\..
- ORtG\NAL
)
)
To:
Winton Aubert - AOGCC
Date: November 5, 2004
From:
Jim Smith - BPXA GPB Rotary Drilling
Subject:
V -03 Application for Sundry Approval - P&A for Sidetrack Operations
Approval is requested for the proposed P&A of PBU well Y-03. This Ivishak Zone 4 injector was converted
from production to injection in 1985 after poor production results. In 1995 the well was converted to WAG /"
injection, later evaluation indicated that due to faults and fractures in the Ivishak the sweep was not
effective. In 2002 the well developed tubing by inner annulus communication and the well was shut in
during January of 2003. It has been shut in since that time. It has been decided to sidetrack the well as the
best solution for conformance issues and to allow repairs to the tubing integrity problem.
The Y-03A replacement well bore is designed to exploit the same Zone 4 sands as the original well bore
however the wellbore will be directed in a horizontal profile to enhance sweep conformance and support /'
adjacent wells Y-16, Y-02A, Y-04 and improve offtake at well Y-19.
The Y-03A sidetrack is currently scheduled for Nabors 2ES beginning around November 16, 20040 The
pre-rig work for this sidetrack will be priority scheduled immediately after the Application for Sundry is
approved.
,Scope
Pre-RiQ Work:
1. Rig up slickline, drift 4-1/2" tubing to WlEG.
2. Fluid pack tubing and inner annulus. ø
3. P&A perfs from the PBTD to -8,800' MD. RIH with ~o PBTD @ 9,240' MD. lay i 1",,-, bls of
cement to -8,800' MD. Obtain Squeeze on cement wi~dditional bbls. POH with coil. .
4. Rig up slickline, tag TOC. ,
5. RU E-line. Chemical cut the tubing at 8,250' MD. ~
6. Fluid pack T X IA with seawater, test IA to 4000 psi and then freeze protect with diesel to 2,200' MD.
7. Test the 9-5/8" pack-off and tubing hanger seals to 5000 psi. /
8. Function all lock-down screws. Repair or replace as needed.
9. Bleed casing and annulus pressures to zero.
10. Set a BPV in tubing hanger. Secure well.
11. Remove the well house.
12. If necessary, level the pad. Please provide total well preparation cost on the handover form.
/
^
RiQ Operations:
1. MIRU Nabors 2ES ,
2. Pull BPV. Circulate out freeze protection and displace well to seawater. Set TWC. /
3. Nipple down tree. Nipple up and test BOPE. Pull TWC. /
4. Pull 4-1/2" tubing from pre-rig tubing cut at 8,250' MD.
5. RU e-line. Run GR/JB for 9-5/8", 47# casing with CCl to just above top of tubing stub.
6. RIH with CIBP on e-line. Set CIBP to avoid cutting a ca~ing collar during window milling operations.
7. Test casinQ to 4000 psi aQainst bridQe pluQ. Tk{ ( 10- 40 ')' c:t.(Jprov'l4...l.
8. PU 9-5/8" Baker bottom trip whipstock assembly. RIH, orient whipstock with gýro and set on CIBP.
V-03 Application for Sundry
)
')
9. Swap over to 10.3 ppg LSND milling and drilling fluid (Kingak KOP).
10. Mill window in 9-5/8" casing at 8,200' MD (top of window) plus 20' past middle of window. Perform
FIT. POOH.
11. MU 8-1/2" drilling assembly with Dir/GR and wet connect. RIH.
12. Orient BHA with gyro to kick off and drill ahead. Drill with gyro until a gravity tool face is obtained.
13. Drill the 8-1/2" intermediate interval, building and turning at 6°/100' to a 42° hold angle.
14. Drill ahead to casing point at Top Sag River to an estimated depth of 9,238' MD.
15. Run and cement a 7" drilling liner throughout the 8-1/2" hole and back into the 9-5/8" casing with 150'
of overlap. Displace cement with mud. POOH.
16. RU E-line. RIH and run USIT log from PBTD to top of 7" liner. Quality cement bond required by
AOGCC to allow water injection.
17. MU 6-1/8" BHA with Dir/GR/RES/ABI and RIH to the landing collar.
18. Pressure test wellbore to 4000 psi for 30 minutes.
19. Drill shoe track. Swap over to 8.5 ppg mud and drill 20' of new formation. Perform FIT.
20. Drill the 6-1/8" production interval building at 12°/100' to horizontal, targeting 24 Ivishak. Drill ahead to
an estimated TD of 13,090' MD.
21. Run and cement a 4-1/2" liner throughout the 6-1/8" wellbore and back into the 7" drilling liner to place
top of liner with 150' of overlap. Displace cement with perf pill and mud.
22. Release from liner, displace well to clean seawater.
23. Pressure test wellbore to 4000 psi for 30 mins.
24. RIH with DPC perf guns. Perf intervals to be determined from LWD logs.
25. POOH. LD DP and perf guns.
26. Run 4-1/2", 12.6#, L-80 completion tying into the 4-1/2" liner top.
27. Set packer and test the tubing to 4000 psi and annulus to 4000 psi for 30 minutes.
28. Set and test TWC.
29. ND BOPE. NU and test the tree to 5000 psi.
30. Freeze protect the well to -2200' and secure the well.
31. RDMO
Post-RiQ Work:
1. Install wellhouse and flowlines.
2. MIRU slickline. Pull the ball and rod / RHC plug from 'XN' nipple below the new production packer.
Regards,
Jim Smith
GPB ODE
564-5773
V -03 Application for Sundry
TREE =
tWELLHEAD =
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
M~~ ~ngle = .
Datum MD =
, , '
Datum TVD =
6" MCEV OY
MCEVOY
OTIS
80.62'
50,89'
3082'
. 22 @ 4600'
9127'
8800'SS
~
r 13-3/8" CSG 72#, L-80 BTRS, ID = 12.347" H 2670' 1
Minimum ID = 3.725" @ 8434'
4-1/2" OTIS XN NIPPLE
I TOP OF 7" LNR H 8415' 1
4-1/2'" TBG, 12.6#, L-80 IPC AB MOD BUTT, ~ 8464' I
0.0152 BPF, ID = 3.958"
I 9-5/8" CSG, 47#, L-80 BTRS, ID = 8.681" l-i 8917' ~
ÆRFORA TION SUMMARY
REF LOG: BHC/GR ON 07/29/80/CBL ON 08/03/80 1 shallow
ANGLEAT TOP ÆRF: 2 @ 9077'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2-7/8" 4 9077-9103 0 04/01/89
3-1/8" 4 9186 - 9191 0 01/01/80
3-1/8" 4 9202 - 9216 0 01/01/80
3-1/8" 4 9224 - 9238 0 01/01/80
3-1/8" 4 9248 - 9276 C 06/01/85
3-1/8" 4 9286 - 9316 C 06/01/85
I PBTD l-t 9746' 1
I 7" LNR, 29#, L-80 BTRS, .0371 bpf, ID = 6.184" l-f 9915' ~
DATE
0828/80
11/06/00
01/30/01
06/22/01
02/25/03
04/28/03
COMMENTS
ORIGINAL COMPLETION
SiS-QAA CONVERSION TO CANVAS
SIS-LG REVISION
RN/TP CORRECTIONS
JMP/KK WANER SAFETY NOTE
A TD/1LH WANER SAFETY NOTE
DA TE REV BY
REV BY
V-03
i
z
!
~
-
SA.~ NOTES: ***SLOW TxlA COMM.
O~ }TING LIMITS: MAX lAP = 2000 PSI, MIN
OAP = 1000 PSI (04/21/03)***
I 2034' 1-l°TIS BVN SSSV LAND NIP, ID = 3,813" 1
::::>---l 2598' l-f 9-5/8" DV PKR 1
~
L
I I
j
Z
_I
l
COMMENTS
ST MD TVD
5 3005 2924
4 5145 4929
3 7256 6933
2 7936 7610
1 8169 7843
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH
5 OTIS/ RA
22 OTIS/ RA
10 OTIS/ RA
5 OTIS/ RA
4 OTIS/ RA
PORT DATE
8281' 1-1 SLIDING SLEEVE, ID = 3.813" 1
8361' 1-1 TBG SEAL ASSY POLAR PBR 1
8374' H 9-5/8" GUIB POLAR PKR, ID = 3.833" I
8404' H 4-1/2" OTIS X NIP, ID = 3.813" 1
8434'
8464'
8458'
~
H 4-1/2" OTIS XN NIP, ID = 3.725" 1
H 4-1/2" SHEA ROUT SUB I
H ELMD TT DATE NOT A V AILABLE 1
9136' H MARKER JOINT I
9240' H TOP SAND PLUG 10/18/00 1
PRUDHOE BAY UNIT
WELL: Y -03
ÆRMIT No: 1790880
A PI No: 50-029-20411-00
SEe 34, T11 N, R13E,
BP Exploration (Alaska)
r -03A Pre-F\.Jg /
2034'
2598'
2670' ~
4-1/2", 12.6#, L-80, IPC AB MOD BUTT Tbg
41»
Otis BVN SSSV
- 9-5/8" DV Packer
~ 13-3/8",72#, L-80
L
ST MD
5 3005
4 5145
3 7256
2 7936
1 8169
GAS LIFT MANDRELS
TVD DEV TYPE VL V LATCH
2924 5 OTIS/ RA
4929 22 OTIS/ RA
6933 10 OTIS/ RA
7610 5 OTIS/ RA
7843 4 OTIS/ RA
PORT DATE
Minimum ID = 3.725" @ 8434'
4-1/2" oris XN NIPPLE
8250' )~( Chern Cut
I I
Sliding Sleeve
ì Polar PBR
:;g 9-5/8" Guiberson Pkr
8281'
8361' í
8374' :;g
SAFETY NOTES: ***SLOW TxlA COMM.
OPERATING LIMITS: MAX lAP = 2000 PSI, MIN OAP
= 1000 PSI (04/21/03)***
::::: . t
8800'
8917' ~
9077'
TREE = 6" MCEV OY
WELLHEAD = MCEVOY
A'CTÛÃTOR";" ... . .. . . 'örïs
W,',-.W,W.',,",,""'" """'W." ..."" '0'
KB. B.EV = 80.62'
........... .....n.........
BF. B.EV = 50.89'
... . ....""... <....""... ..,,,,, '"
KOP = 3082'
Max' 'Aï,gÏe .~..... m.', '22' @ 4600ï;
.,,,. H.. """"HH.".""<m~""h.m....."..o<..,,.......,,, .......,", ..,...
Datum MD = 9127'
Datum niD ='''äaooiss
PERFORATION SUMMARY
REF LOG: BHC/GR ON 07/29/80/CBL ON 08/03/80 1 shallow
ANGLE AT TOP PERF: 2 @ 9077'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 9077 - 9103 0 04/01/89
3-1/8" 4 9186 - 9191 0 01/01/80
3-1/8" 4 9202 - 9216 0 01/01/80
3-1/8" 4 9224 - 9238 0 01/01/80
3-1/8" 4 9248 - 9276 C 06/01/85
3-1/8" 4 9286 - 9316 C 06/01/85
9240'
{. Top of 7" Liner
4-1/2" Tbg Tail
Top of P&A cement at approx8800'
~ 9-5/8", 47#, L-80
Top Perf at 9077'
1 z.. bb[~
Top of Sand Plug
9915' ~ 7",29#, L-80
Date
05-25-04
Rev By
RBT
Pre-Rig
Comments
PRUDHOE BAY UNIT
WELL: Y-03A
API NO:
Permit NO:
GPB Rotary Drilling
y -03Ai F~toposed COMpletion
2034'
2598' = I
2670' .4
8050' Et
8200'
8225'
8250'
8361' i
8374' :8:
8415' I r
8464' ,
8800'
8917' .4
9240'
I
Otis BVN SSSV
- 9-5/8" DV Packer
~ 13-3/8",72#, L-80
TREE =
WELLHEAD =
ACTUATOR =
KS.ËlËV =
. .. .
SF. ELEV =
KÒP= ~ ....
.. ..
Max Angle =
, . "'....
Datum MD =
DatumTVD =
6" MCEVOY
MCEVOY
OTIS
80.62'
50.89'
3082'
22 @ 4600':
9127'
8800' SS
~ 4-1/2", 12.6#, L-80, TCII
Tubing Tail:
-10' Pup Joint
-X Nipple (3.813")
-10' Pup Joint
-Packer
-20' Pup Joint
-X Nipple (3,813")
-20' Pup Joint
-XN Nipple (3.725")
-10' Pup Joint
-WLEG
1$' 9-5/8" X 7" Baker HMC Liner Hanger
,~. with ZXP and C-2 running tool
Top of window
9,038' - 7 X 4-1/2" Baker S-3 Packer
--.......--
9,088' - 7" X 5" Baker HMC Liner Hanger
with ZXP and C-2 running tool
9238' - 7", 26#, L-80, BTC-M
I I
i
:8:
,. Top of 7" Liner
\ 4-1/2" Tbg Tail
Top of P&A Cement
~ 9-5/8" 47# L-80
, ,
4-1/2",12.6#, L-80, IBT-M
~
13,090'
Top of Sand Plug
9915' ~ T', 29#, L-80
Date
06-02-04
Rev By
RBT
Comments
PRUDHOE BAY UNIT
WELL: Y-03A
API NO:
Permit NO:
GPB Rotary Drilling
Proposed Completion
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
bp
September 12, 2003
Mr. Winton Aubert, P.E.
Alaska Oil & Gas Conservation Commission
333 W. 7th Avenue
Anchorage, Alaska 99501
Subject: Y-03 (PTD 1790880) Cancellation of Sundry
Dear Mr. Aubert:
Attached is Report of Sundry Well Operations form 10-404 for Well Y-03. This
request is to cancel the current Sundry, due to the well being shut in long term.
If you require any additional information or clarification, please contact either
John Cubbon or myself at (907) 659-5102.
Sincerely,
doe Anders, P.E.
Well Integrity GoorOinator
Attachments
RECEIVED
~,~aska 0il & Gas Cons. Cornm.issior~
Anchot'age
SCANNED SEP 2, $ 2003
ORIGINAL
· , STATE OF ALASKA ( (
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
AbanonE] Suspendr-] Operation ShutdownF"l Perforate~--~ Variance[~ Annuar DisposalE]
After Casin.q[-] RepairWellr-1 Plu.q PerforationsC~ StimulateE] Time Extension[~ Otherl~
Change Approved Program[~ Pull Tubing r'-~ Perforate New Poolr-1 Re-enter Suspended Well r-1 CANCEL 10-403
2. Operator 4. Current Well Class: 5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc. Developement E] Expl°rat°ryE] 179-088
3. Address: P.O. Box 196612 6. APl Number
Anchorage, Ak 99519-6612 Stratigraphicr'~ Service~l 50-029-20441-00-00
7. KB Elevation (ft): 9. Well Name and Number:
81.00 Y-03
8. Property Designation: 10. Field/Pool(s):
ADL 028287 Prudhoe Bay Field / Prudhoe Bay Oil Pool
11. Present Well Condition Summary:
Total Depth measured 9915 feet
true vertical 9668 feet Plugs (measured) Sand Plug (~ 9240' (10/18/2000).
Effective Depth measured 9240 feet Junk (measured)
true vertical 8994 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110' 20" 140' 140' 40K 520
Surface 2659' 13-3/8" 2689' 2689' 80 K 2670
Intermediate 8887' 9-5/8" 8917' 8671' 80K 4760
Liner 1497' 7" 8419'-9915' 8173'-9668' 80K 7020
Perforation depth: Measured depth: Open Perfs 9077'-9103', 9186'-9191', 9202'-9216', 9224'-9238'.
Covered w/Sand 9248'-9276', 9286'-9316'.
True vertical depth: Open Perfs 8831'-8857', 8940'-8945', 8956'-8970', 8978'-8992'.
Covered w/Sand 9002'-9030', 9040'-9070'.
Tubing: ( size, grade, and measured depth) 4-1/2" 12.6# L-80 TBG @ 8362'. 4-1/2" 12.6# L-80 T. ai pipe @ 8465'... .
~1.~. ;, ,-. ,.
· .,~:~ ,, . ,., ..
Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" Guiberson Polar Packer @ 8362'.
4-1/2" Otis BV U SSSV Landing Nipple @ 2034'. ,~,,.~., ~.
12. Stimulation or cement squeeze summary: ~15~8 Oi~ & Gas Co~ts.
Intervals treated (measured): ~ch0~',~[j'](
Treatment descriptions including volumes used and final pressure:
13 Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: SHUT-IN
Subsequent to operation: SHUT-IN
14. Attachments: 15. Well Class after proposed work:
Exploratoryr"l DevelopmentE] Service~
Copies of Logs and Surveys run ~ 16. Well Status after proposed work:
OilE] GasD WAGD G,NJD WlNJBil WDSPLF-]
Daily Report of Well Operations __
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.O. Exempt:
Contact Joe Anders I 303-074
Printed Name Joe Anders Title GPB Well Integrity Engineer
Signature /~t/"'~" u/~,~,:~,,~ I IN Ilmi~\[~ r-~ , f"~ I ~ne 907/659-5102 Date June10,20_0..3.
Form 10-404 Rev/ised 2/2003
' R8 $ Ft. SEP ]. o 2[it
\> \'J () ~ 1<:.\ \. <:7
(
Summary of Sundry Changes
09/12/03
Well Request 10-403 10-404
04-45 Align Conditions of Approval with Sundry XX XX
Matrix
09-12 Align Conditions of Approval with Sundry XX XX
Matrix
11-10 Align Conditions of Approval with Sundry XX XX
Matrix
11-29 Align Conditions of Approval with Sundry XX XX
Matrix
14-21 Align Conditions of Approval with Sundry XX XX
Matrix
A-31 Align Conditions of Approval with Sundry XX XX
Matrix
P1-01 Align Conditions of Approval with Sundry XX XX
Matrix
P-14 Cancel Sundry XX
Y -03 Cancel Sundry XX
Contact Joe Anders or John Cubbon with questions.
(907) 659-5102
(
/7r-() flY'
Comments
Well is L TSI
Well is L TSI
SCANNED OCT 10 2D04
BP Exploration (Alaska) Inc.
Post Office Box 196612
PRB-24
Anchorage, Alaska 99.519-6612
bp
March 6, 2003
Mr. Tom Maunder, P.E.
Alaska Oil & Gas Conservation Commission
333 W. 7th Ave.
Anchorage, Alaska 99501
Subject: Y-03 (PTD 1790880) Application for Sundry Approval
Dear Mr. Maunder:
Attached is the Application for Sun~d_..ry Cancellation form 10-404 and Application for
Sundry form 10-403 for well Y/q93'.. T~tis request is for approval to cancel the existing
Sundry scheduled to expir~4/30~93 apd issue a new sundry to continUe injection into a
well with Tubing by IA com~ibation: A description summary of proposal and wellbore
schematic is included.
If you require any additional information or clarification, please contact either John
Cubbon or me at (907) 659-5102.
Sincerely,
Joe Anders, P.E.
Well Integrity Engineer
Attachments
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request: Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _
VARIANCE Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _
Change approved program _ Pull tubing _ ': Vadance X Perforate Other_
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet)
BP Exploration (Alaska), Inc. Development RKB 81.0 feet
3. Address Exploratory 7. Unit or Property name
P. O. Box 196612 Stratigraphic
Anchora~le, AK 99519-6612 ServiceX Prudhoe Bay Unit
4. Location of well at surface 8. Well number
1249' FNL, 4731' FEL, Sec. 34, T11N, R13E, UM (asp's 645361, 5949017) Y-03
At top of productive interval 9. Permit number / approval number
5128' FNL, 5145' FEL, SEC 27, T11 N, R13E, UM (asp's 644918, 5950409) 179-088 ~
At effective depth 10. APl number
5121' FNL, 5144' FEL, Sec. 27, T11 N, R13E, UM (asp's 644918, 5950416) 50-029-20441-00
At total depth 11. Field / Pool
5091' FNL, 5140' FEL, Sec 27 T11N, R13E, UM (asp's 644922, 5950446) Prudhoe Bay Field / Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured 9915 feet Plugs (measured)
true vertical 9668 feet
Effective depth: measured 9420 feet Junk (measured)
true vertical 8994 feet
Casing Length Size Cemented Measured Depth True vertical Depth
Conductor 110' 20" 90 c.f. 140' 140'
Surface 2659' 13-3/8" 3720 c.f. 2689' 2689'
Intermediate 8887' 9-5/8" 1358 c.f. 8917' 8671'
Liner 1497' 7" 401 c.f. 8419' - 9915' 8173' - 9668'
Perforation depth: measured Open Perfs 9077'-9103', 9186'-9191 ', 9202'-9216', 9224'-9238',
Covered w/Sand 9248'-9276', 9286'-9316'.
true vertical Open Parrs 8831'-8857', 8940'-8945', 8956'-8970', 8978'-8992'. ~ ~. :
Covered w/Sand 9002'-9030', 9040'-9070'. .~..
Tubing (size, grade, and measured depth 4-1/2", 12.6#, L-80 TBG @ 8362' MD. 4-1/2", 12.6#, L-80 Tailpipe to 8465'. '
·
Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" Guiberson Polar Packer @ 8362'.
4-1/2" Otis BV N SSSV Landing Nipple @ 2034' MD.
13. Attachments Description summary of proposal X Detailed operations program BOP sketch
14. Estimated date for commencing operation 15. Status of well classification as:
March, 2003
16. If proposal was verbally approved Oil V~J ~ Gas // Suspended
Name of approver Date approved Service WATER INJECTOR
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Call Joe Anders @ 907 659-5102.
Signed: /(j~ ~ Title: Well Integrity Engineer Date: 31~/0:3
Prepared by DeWayne R. Schnorr 564-5174
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness I Approval no.
Plug integrity BOP Test Location clearance ' I .~...~
C) h Uech, an.ic-.al~nte~rityTest JL /__ .L Subs. equ_en.t_fo_rmrequire__d. 10- . ~N~. o~.¥,-~ ~'/"u'/~--'~l::;~._
' ' o -,~$'d~d,l / ' ~ ' -- ~ - ~'"
Approved by order of the Commission ~ ~ ~ '~'"'-~$ Commissioner Date
~CANNED MAR i 3 200~
Form 10-403 Rev 06/15/88
I2 ?nm
SUBMIT IN TRIPLICATE
Y-03
Description Summary of Proposal
03/05/03
Problem: Injector with Slow TxlA Communication
Well History and Status
Well Y-03 (PTD 1790880) is an injector with slow TxlA communication. Sundry # 301-
068 was issued on 4/27/01 to allow continued water injection. It has an expiration date
of 4/30/03. Recent events:
> 04/15/02: SL set TTP.
> 04/16/02: CMIT TxlA Passed to 2500 psi.
> 04/21/02: SL pulled TTP.
> 06/08/02' LLRT-IC - 8.8 GPM @ 870 psi.
> 02/20/03: MITOA Passed to 2400 psi. ~'
This sundry request is to allow for continued injection of water. The following supports
the request:
· A CMIT-TxlA passed on 04/16/02 to 2500 psi, demonstrating competent
production casing.
· Pressures and injection rates will be monitored and recorded daily and checked
for indications of a production casing leak.
· An annual IA leak rate test will be conducted to monitor the leak severity.
· A CMIT-TxlA will be conducted every 4 years to confirm production casing
integrity.
Proposed Action Plan
1. Allow well to continue water-only injection.
2. Record wellhead pressures and injection rates daily.
3. Submit a monthly report of daily pressures and injection rate.
4. Perform an annual IA leak rate test. ~
5. Perform combination MIT Tubing x IA against a plug every 4 years.
6. Stop injection and notify the AOGCC if there is any indication of loss of production
casing integrity.
ANNED MAR 3 003
TREE = 6" MCEVOY
WELLI-EAQ = MCEVOY
ACTUATOR = OTIS
KB. ELEV = 80.62'
KOP = 3082'
Max Angle = 22 @ 4600'
Datum MD = 9127'
Datum TVD = 8800' SS
I 13-3/8" CSG 72#, L-80 BTRS, ID = 12.347" 2670'
Y-03
2034'
2598'
SAFETY NOTES:
HOTIS BVN SSSV LAND NIP, ID =3.813"
H9-5/8" DV PKRI
GAS LIFT MANDRELS
IMinimum ID = 3.725" @ 8434' J
4-112" OTIS XN NIPPLE
I TOPOF7" LNR H 8415'
4-1/Z'TBG, 12.6#, L-801PC AB MOD BUTT, ~-~ 8464'
0.0152 BPF, ID = 3.958"
I 9-5/8" CSG, 47#, L-80 BTRS, ID = 8.681" H 8917'
PERFORATION SUMMA RY
REF LOG: BHC/GR ON 07/29/80/CE~L ON 08/03/80 1 shallow
ANGLE AT TOP PERF: 2 @ 9077'
Note: Refer to R'oduc~on DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 9077 - 9103 O 04/01/89
3-1/8" 4 9186 - 9191 O 01/01/80
3-1/8" 4 9202 - 9216 O 01/01/80
3-1/8" 4 9224 - 9238 O 01/01/80
3-1/8" 4 9248 - 9276 C 06/01/85
3-1/8" 4 9286 - 9316 C 06/01/85
I PBTDH 9746'
I 7"LNR'29#'L'80BTRS''0371bpf'ID=6'184" H 9915'
L
8281'
8361'
8374'
8404'
8434'
8464'
8458'
H S
LIDING SLEEVE, D=3.813" J
TBG SEALASSY FOLARPBR j
H 9-5/8" GUIBPOLARPKR, ID=3.833"I
4-1/2" OTIS X NIP, ID = 3.813" I
H 4-1/2"OTISXNNP, ID=3.725" I
H 4
-1/2" SHEA ROUT SUB I
H
ELMD 'IT DATE NOT AVAILABLE
I 9136' H MARKI~, JOINT
I 9240'
H TOP
SAND PLUG 10/18/00 I
DATE REV BY COMMENTS DATE REV BY COIVIVlENTS
0828/80 ORIGINAL COMFLErlON
11/06/00 SiS-QAA CONVERSION TO CANVAS
01/30/01 SIS-LG REVISION
06/22/01 RN/TP CORRECTIONS
PRUDHOE BAY UNE
WB_L: Y~3
PERIVlT No: 1790880
APl No: 50-02¢20411-00
SEC 34, T11N, R13E
BP Exploration (Alaska)
Wavier CheCk List
Well Name: ~ - ~ ~ Operator: ~ ~
PTD: ! 7 ~? -' 0 ~ Sundry #: 50 5 "O 7 q' Order(s):
Item Y/N Comments
1. Notified of pressure communication or leakage?
2. Diagnostics planned/nm? Method?
3. Form 10403 submitted requesting waiver?
4. Alternate MIT passed? Method? AOGCC witnessed?
5. MIT Part II verified? How?
6. Area or Review examined?
Date:
Definition of Terms
T
IA
OA
MIT
CMIT
LLRT
Tubing
Inner Annulus (tbg x csg)
Outer Annulus (csg x csg)
Mechanical Integrity Test
Combined test of annular spaces
Leak Loss Rate Test
Integrity # Barriers Condition AOGCC Notification Enhanced Operational Restrictions
Category Affected Requirements Monitoring Requirements~
Normal 0 Full wellbore integrity MIT - 4 years Water, slurry, gas, MI upon approval
TxIA communication (tubing Next business day if 200 psig Annual MITIA/LLRT
3 .1 leak; packer leak quantifiable) change in annulus pressure CMIT TxIA - 2 yrs .Water only
IAxOA communication Annual MITIA & CMIT IAxOA Water only; annulus PSV w/alarms & set points
2 1 ProductiOn casing leak MIT Tubing - 2 yrs ' for ESD < MIYP of next oUter casing
TxlAxOA communication Kill well; submit Sundry (10403) outlining
1 >1 Release beyond wellbore Next business day Daily reports until well secured repairs
addition to Monthly Report of Daily Operating Parameters; Annulus Pressure Monitoring
Matrix applies to the following well configuration: 1. Conventional completion per regulations; monobore on case by case basis
2. Production casing designed .for shut-in tubing pressure
3. USDW exemption or finding of no aquifer
Reviewing Engineer:
Recommended Action:
Integrity Category:
Waiver 'chklst.doc:8/2/2002 ~J~'J~.NJ~ ~g~ i $ 2{}03
--
BP Exploration Alaska Inc.
Pos! Office Box 196612
PRB-24
Anchorage, Alaska 99519-6612
bp
March 19, 2001
Mr. Tom Maunder
Alaska Oil & Gas Conservation Commission
333 W. 7th
Anchorage, Alaska 99501
Subject: Y-03 (PTD 179-088) Sundry Notice Variance Request
Dear Mr. Maunder:
Attached is an Application for Sundry Approval form 10-403 variance request for well Y-
03 (PTD 179-088). The request is for approval to continue produced water injection with
known tubing x inner annulus communication. Also attached is a proposed Action Plan
and a wellbore schematic.
If you require any additional information or clarification, please contact either Kevin
Yeager or me at (907) 659-5102.
Sincerely,
Joe Anders, P.E.
Well Integrity Engineer
Attachments
RECEIVED
MAR 2 3 2001
Alaska O~1 & Gas Cons Commission
Anchorage
( '~, STATE OF ALASKA ~rvi
ALASKA ,L AND GAS CONSERVATION CO ;SSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Sbmulate
2. Name of Operator
BP Explorabon (Alaska) Inc.
3. Address
P.O Box 196612, Anchorage, Alaska 99519-6612
5. Type of well' [] Development
[] Exploratory
[] Stratlgraph~c
[] Service
4. Locabon of well at surface
1250' SNL, 548' EWL, SEC. 34, T11N, R13E, UPM
At top of producbve interval
N/A water ~njecbon well
At effecbve depth
165' NSL, 134' EWL, SEC 27, T11N, R13E, UPM
At total depth
187' NSL, 137' EWL, SEC. 27, T11N, R13E, UPM
6 Datum Elevabon (DF or KB)
KBE = 80.62' AMSL feet
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
Y-03 (14-27-11-13)
9. Permit Number
79-88
10 APl Number
50- 029-20411
1. F~eld and Pool
Prudhoe Bay F~eld / Prudhoe Bay
Pool
12. Present well cond~bon summary
Total depth: measured 9915' feet
true vertical BKB 9668' feet
Effective depth: measured 9434' feet
true vertical BKB 9187' feet
Casing Length S~ze
Structural
Conductor 110' 20x30"
Surface 2659' 13-3/8"
Intermediate 8887' 9-5/8"
Producbon
L~ner 1497' 7"
Plugs (measured)
Junk (measured)
fill @ 9434' WLM (04/89)
Cemented MD TVD
10c.y. 140" 140'
3720 cf. 2689' 2689'
1358 c.f 8917' 8671'
401 cf 8419'-9915' 8173'-9668'
Perforation depth:
measured
true vertical
9077-9103 (Sag R)
9186-9191; 9202-9216, 9224-9238; 9248-9276 (Iv~shak)
subsea 8750-8776 (Sag R)
8859-8989 (five Iv~shak Intervals)
Tubing (s~ze, grade, and measured depth) 4-1/2" L-80 to 8362' w~th 4-1/2" ta~lp~pe to 8465'
Packers and SSSV (type and measured depth)
RECEIVED
MAR g 3 2001
Alaska O~i & Gas Cons Commission
Anchorage
9-5/8" Gu~berson packer @ 8362'; 4-1/2" BVN @ 2034'
13. Attachments [] Descnpbon summary of proposal [] Detaded operabons program [] BOP sketch
14. Esbmated date for commencing operabon
November 2000
16. If proposal was verbally approved
15. Status of well class~flcabons as'
[] 0~1 [] Gas [] Suspended
Service Water Injecbon
Name of approver Date approved
Contact EngJneer Name/Number Joe Anders 695-5102 Prepared By Name/Number Michael WJlharns, 564-4657
17. I hereby cejrbf_y~go,ng ~s true and correct to the best of my knowledge
S~gned//¢J~ ~ /
,Jbe Anders/Kev,n Yeacler T~tle Well Inteqnt¥ Enqineer Date ,-~/J (~ O /
Commission Use Only 'A'
Conditions of Approval: Notify Commission so representative may witness [ Approval No ~'~0/. ~'~'
Plug ~ntegnty __ _ BOP Test __ Locabon clearance C,.~.c~:~r.\~(e..~'~C~, ~,.~',,I O'."~~&
_ '.. Mechan,cal Integr,ty Test ~ Subsequent form requ,red 10-
Approved by order of the Commlsslon ~ IV[. ~¢,~.J,/J/¢~ Commissioner Date
Form 10-403 Rev. 06/15/88
Submit In Tnphcate
0 R ! G INA
Y-03
Sundry Application Action Plan
03/17/01
Well History/Status
Well Y-03 (PTD 179-088) is an injector that failed a recent MIT-IA. An MIT-IA conducted
on 10/29/00 failed with a leak rate of 4gpm at 1750 psi. An CMIT-TxlA against a tubing
tail plug passed to 3000 psi on 11/22/00, indicating competent production casing.
Injection rate on 3/1/01 is 7500 BWPD @ 2000 psi.
This sundry request is to allow for continued injection of water into Well Y-03. The
following supports the request:
A passing CMIT-TxlA was performed on 11/22/00 to 3000 psi against a tubing
plug, demonstrating competent production casing.
Proposed Action Plan
1. Allow well to continue water-only injection.
2. Perform combination MIT Tubing x IA against a plug every 2 years.
3. Record wellhead pressures and injection rates daily.
4. Submit a monthly report of daily pressures and injection rate.
5. Stop injection and notify the AOGCC if there is any indication of loss of production
casing integrity.
RECEIVED
MAR 2 3 ZOO1
Alaska 0~1 & Gas Cons Commission
Anchorage
II
TREE 6" UCEVOY KB ELEV-- 8O 62'
WELLH~,D MCEVO¥ Y-03i ., .~v = ~0 ~.,
ACTUATOR OTIS ~ ~ ~-- ~ -- --
~ ( OTIS B~)(3 813" ID)
13-3'8", 7~, 1267or
L-80, BTRS ( ~T~R W/~A ~ ~T~H~
'5 3005 2924
I I ' 45145 4929
KOP 28~' ~ 3 7256 6933
~a~ ANGLE 22~ ~4600' ~~1 ~ 21 7936 7610
I
AB MOD BU~ TUBING
TUBING ID 3 958" ,
CAPACI~ 0 0152 BB~FT
__ OTIS ~( 3 813" ID)
TUBING S~L ASSY
~ ~ ~o~. 18361' I
9-5/8" PACKER
~[ ~(GUIBERSON"O~") 18374' I
~ ~ ( 3 S33"~D)
~ ~ 4-1/2" TAILPIPE
I
,o~ o~ ] 84 ~ 5' l
7" ~ (o~s) (a 0a3-~)
u.~. I
(OTIS)(3 725" ID)
· ~,.~,~,, ~.~..o~ s~. 18464'
9-5/8", 47~/ff, ~
~-~0,...s ~.,.~.so.~..~ 18458' Ij
,
MARKER JOINT J 9 1 36'
REF LOG BHC/GR 7~29~80 CBL(8/3/80) IS 1' SHALLOW
S~ze ~PF Interval )pen / Sqz
2 7/8 4 9077-9103 4/89 OPEN
PBTD
I~/~O
I
DATE REV BY COMMENTS PRUDHOE BAY UNIT
8/8o COMPLETION WE LL: Y-03(27-11-13 )
11/25/89 MMM ORIGINAL MAC DIAG~ APl NO: 50-029-2041
SEC 34; TN 11;,RG,E 13
BP Exploration (Alaska)
GAS LIFT MANDRELS
( OTI.~ W/~A I AT~H~
Ns Mn(RKR'
5 3005 2924
4 5145 4929
3 7256 6933
2 7936 7610
1 8169 7843
RECEIVED
MAR 2 3 ZOO1
Alaska QI & Gas Cons. Commission
Anchorage
[e Y-03 Faded MITIA, PTD 179-088
Subject: Re: Y-03 Failed MITIA, PTD 179-088
Date: Mon, 30 Oct 2000 16:05:04-0900
From: Blair Wondzell <blair_wondzell@admin.state.ak. us> Internal
Organization: State of Alaska, Dept of Admin, Oil & Gas
To: "PBU, Well Integ T L" <pbuwell~ntegtl@BP.com>
CC: "AOGCC - Tom Maunder (E-mail)" <Tom_Maunder@admin.state.ak. us>,
"AOGCC - Lou Grimaldi (E-mad)" <Lou_Grimaldi@admin..,late.ak. us>
Joe,
Thanks for the information. Sounds like a good plan. At an earlydate you
should plan to do a CMIT to demonstrate the casing has integrity.
Sincerely, Blair Wondzell, 1-/30/00.
"PBU, Well Integ T L" wrote:
Hello Tom & Blair. Injection well Y-03 (PTD 179-088) failed an MT-IA on
10/29/00. We were unsuccessful in pressure testing the IA and established a
leak rate of. 1 BPM @ 1750 psi. The well is currently injecting 5300 BWPD.
Our plan is to keep the well on injection while the leak source is
evaluated. We will keep you informed of progress.
Please call if you have any questions.
Joe Anders, PE / Kevin Yeager
Well Integrity Engineer
BP Exploration, Alaska
(907) 659-5102
email: pbuwellintegtl@bp, com
of 1 11/17/00 2 50 PM
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 31 August 1994
RE:
Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
/
WELL ~//~ # DESCRIPTION
Y-03 ~/~ ~ ~~ 1 PL/PROFILE FINAL BL
Y-29 (23-04-10-13) 1 PFC/PERF FINAL BL
l PFC/PERF RF SEPIA
¥-33 (32-28-11-13) Pk"G/PERk" FllqhL BL
PFC/PERF RF SEPIA
1 GR/CCL RF SEPIA
1 PFG/PERF RF SEPIA
Run # 1
Run # 1
ECC No.
1215.01
Run # 1 4772.02
Run # 1
Run # 1 4844.01
Run # 1
Run # 1 4986.02
Run # 1
Run # 1 5157.03
Run # 1
Run # 1 5167.01
Run # 1
Please sign and retur~ t~: A~la~ Wi/el.Lne S~rvi~e~ ,,/~' ~ 5600~B Stre.ft
'~ ~ ~ S'ulte 201 /
~. ~ ~nch%rage, ~K 99518
~ ~A~tn~ Rodne~ ?~'. Pau~son
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :10/03/90
T# :81724
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
RECEIVED
OCT 1 o 1990
~ 0ti & 6ms C~s. Cam~issle~
Enclosed is your copy of the material listed below. If you have any qu~please contact BP
Well Records at (907) 564-4445.
D-22
G-07
J-15
J-20
K-07
K-11
M-12
M-14
W-03
X-12
Y-03
Prod-F 09/23/90 #1 9080-9370 Camco 5"
Prod-F 09/19/90 #1 10980-11315 Camco 5"
Prod-F 09/21/90 #1 5090-9940 Camco 5"
Prod-F 09/21/90 #1 10000-11510 Camco 5"
Leak Detection 09/16/90 #1 10000-12050 Camco 5"
Prod- F 09/19/90 #1 9980-10175 Camco 5"
CCL 09/22/90 #1 10420-10665 Camco 5"
Inj 09/20/90 #1 9690-10175 Camco 5"
Inj 09/22/90 #1 10160-10725 Camco 5"
Prod-F/Jewery 09/18/90 #1 9050-9888 Camco 5"
PITS 09/23/90 #1 9850-9400 Camco 5"
Inj/PITS 09/24/90 #1 8900-9400 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
April 24, 1989
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-3 (14-27-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
Waterflood & Miscible Flood
BJP: JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
RE¢,EIV D
APR 2
AJa$~.Oi! & Gas Cons, Cc'min.%sion
~! ~chorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1250'$NL, 548' EWL, SEC. 34, T11N, R13E, UPM
At top of productive Interval
N/A - water injection well
At effective depth
165'NSL, 134' EWL, SEC. 27, TI IN, R13E, UPM
At total depth
187'NS1., 137° EWL, SEC. 27, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Stimulate Plugging ...
Alter casing Repair well
5. Type of Well:
Development X
Exploratory
SlTatigraphic
9915feet Plugs (measured)
9668feet
Perforate X
Other
6. Datum elevation (DF or KB)
KBE . 80.62 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-03 (14-27-11-13) PBU
9. Permit number/approval number
79-88/9-195
10. APl number
50- 029-20411
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured
true vertical
9434feet
BKB 9187feet
Junk (measured) fill at 9434' WLM (04/89)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth
110 20 x 30 10 c.y. 140
2659 13 3/8 3720 c.f. 2689
8887 9 5/8 1358 c.f. 8917
measured
true vertical
Tubing (size, grade, and measured depth)
1496 7 401 c.f. 8419-9915
9077-9103' (Sag R)
9186'-9191', 9202'-9216', 9224'-9238', 9248'-9276', 9286'.9316' (Ivishak)
subsea 8750'-8776' (S.ag~ R)
8859'-8989' (five Ivishak intervals)
4 1/2" L-80 to 8362' with 4 1/2" taiipipe to 8465'
True vertical depth
BKB
140
2689
8671
8173-9668
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 8362'; 4 1/2" BVN at 2034'
13. Stimulation or cement squeeze summary
14.
Intervals treated (measured)
Treatment description including volumes used and final pressure
Reoresentative Daily Average Production or Injection Data '
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
RECEIVED
APR 2
Alas~ Dil & Gas Cons, Cc, mmi~.~inn
' ~chorage
Tubing Pressure
Prior to well operation 7150 970
Subsequent to operation 6700
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X /~ Oil Gas Suspended
17. I hereby certify that the foregpjng is tr, u/,e/and correct to the best of my knowledge.
Form 10-40~, Rev 06~1~,/88-
Service
Title Supervisor Watedlood/Miscible Flood
900
water injection well
WELL Y-3 (14.27-11-13~ PBU
/~DD'L. PERFORATION OPERATIONS
The following Sag R. interval was perforated April 4, 1989 using Schlumberger 2 7/8"
carrier guns at 4 spf:
9077' - 9103' MD BKB (Ref. BHCS, 7/29/80)
A lubricator was installed and tested to 3500 psi for all well work. The well was
returned to injection immediately following perforating operations.
jm
4/19/89
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
EXXON
TET~O
TO: MOBIL
REFERENCE:
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
·
BP'CASED HOLE FINAL LOGS
BP Exlalorat,on (Alaska) Inc..
900 East Benson Boulevard
PO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
DaTe: 04-07-89
T~: 79941
The following material Is being submll'ted herewith. Please acknowledge receipt by
slgnlng a copy of this letter and returning It to this office:
C-21 Completion 03-31-89 #1 7950-9201 Sch 5"
D-26 Completion 03-02-89 #1 9690-9930 Sch 5"
K-lO Completion 04-01-89 #1 9440-10070 Sch 5"
U-3i Completion 04-02-89 #1 8910-9492 Sch 5"
U-lOi Copmletion 04-02-89 #1 9450-10104 Sch 5"
Y-3i Completion 04-04-89 ~.1 0-9280 Sch 5"
Y-09 Completion 04-05-89 #1 10120-10450 Sch 5"
Y-11i Completion 04-05-89 #1 9546-9850 Sch 5"
Z-01 CNL (2 1/2") 03-31-89 #1 10100-10784 Sch 5"
Y-05i Completion 04-04-89 #1 9680-9900 ,Sch 5"
Received
Date
BP EXPLORATION
March 9, 1989
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-3 (14-27-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
Yours very truly,
B. J. Poli
Supervisor Waterflood & Miscible Flood
BJP:JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
RECEIVED
,*~,[aska .0il & 8as Cons. CommJssJoF,
,, gnchorago
1. Type of Request:
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
Abandon Suspend
Alter ca~ng Repair well
Change approved program ,, .
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Lo(~tion of well at surface
1250'SN1., 548'EW1., SEC. 34, TI IN, R13E, UPM
At top of productive interval
79'NSL, 168'EWL, SEC. 27, T11N, R13E, UPM
At effective depth
180'NSI., 137' EWL, SEC. 27, T11N, R13E, UPM
At total depth
187' NSL, 137°EWL, SEC. 27, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Operation Shutdown Re-enter suspended well
Plugging Time extemdon Stimulate
Pull tubing Vadence Perforate X O~er
5. Type of Well: 6.
Development X
Expkxamry
S~r~igraphic
Service,,
,,
8.
9.
10.
9915 feet Plugs (measured)
9668 feet
Datum elevation (DF Or ~B) "
KBE = 80.62 AMSL feet
Unit or Property name
Prudhoe Bay Unit
Well number
Y-03 (14-27-11-13) PBU
Permit number
79-88
APl number
50- O29-2O411
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured
true vertical
9772 feet Junk (measured)
BKB 9525 feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth True vertical depth
-. BKB
110 20 x 30 10 C. yo 140 140
2659 13 3/8 3720 c.f. 2689 2689
8887 9 5/8 1358 c.f. 8917 8671
measured
1496 7 401 c.f. 8419-9915
9186'-9191', 9202'-9216', 9224'-9238', 9248'-9276', 9286'-9316'
true vertical subsea
8859'-8989' (five intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8362' with 4 1/2" tailpipe to 8465'
8173-9668
RECEIVED
~bska 0il & Gas Cons.
'' Anchorage
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 8362~ 4 1/2" BVN at 2034'
13. Attachments
Description summary of proposal x Detailed operations program ..... BOP sketch ..Z._
14. Estimated date for COmmencing operation
February 1989
16. If proposal Was verbally approved
Name of approver
Date approved
15. StatUS Of well classification as:
Oil Gas Suspended.
Service water injection well
17. I hereby certify that the foregoing is true and COrrect to the best of my knowledge.
Si~lned '~~~/Y~'~~ FOR COMMISSIoNTitleSupervis°rWaterflood/MiscibleFl°°dusE ONLY Date...~/~',//~
Conditions of approval: Notify Commission so representative may witness I Approval No. ~..._
Plug integrity ~ BOP Test Location clearance ...
Mechanical Integrity Test~ Subsequent form required 10:'
0R, N^L S, NE9
Approved by order of the Commission ij31~l~.ll~: n ~bllTH Commissioner Date
Form 10-403 Rev 06/15/88 ~pp~oved Copy SUBMIT IN TRIPLICATE
Returned
WELL Y-3 (14-27-11-13~ PBU
ADD~L. PERFORATION PROPOSAL
We propose to perforate the following Sag River interval during February 1989:
9077'- 9103' MD BKB (Rcf. BHCS, 7/29/80)
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to production immediately following perforating operations, then tested.
jm
2/10/89
FLOW TUBES
& PACKOFF
BOWEN PACKOFF
'N~ -~'-- HAND
PUMP
GREASE SEAL
FLOWTUBE
FLOWLINE
GREASE LINE
FLOWLINE
VALVE
RISER
GREASE
/ MANIFOLD
BOP
GREASE
PUMP
-*-GREASE
RESERVOIR
INDEXED
DALLAS
ARCO STANDARD
CHEVRON /\L ASKA PRC)[bL)( [1( )N
EXXON Oate: 10 / 01 / 87
TEXACO
TO- TI: 78208
MOBIL
PHILLIPS
STATE OF ALASKA
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning ~t to this office:
~"~ B-27
~ B-27
~'~ B-3B
~ C-21
"'-~ E- 1
'"-J- 27
~ J-28
J-28
S-13
'~ Y-2
~ Y-3
09/16/87 Camco Flowing Gradient
09/28/87 " ....
09/09/87 GO Flowing Pressure
09/16/87 Camco Static
09/22/87 Camco "
09/25/87 " "
09/17/87 ....
09/25/87 " "
09/12/87 " Flowing Pressure
09/22/87 " Static
09/15/87 GO Pressure Fall OFF
Rece I red
._./ -,,.:',.' u ,a ,nas UONS. U0~l.ql$S!C:~
Anchorage
Victo Aldrzdge
INFOR/,,'~T I ON CONTROL
Records LR2- I
C. V~ C~hatterton December 16
Cha' ,~.~ n '
- ~' D.BDF.89
1986
Lonnie C. Smith
Commissioner
Bobby D. Foster
Petroleum Inspector
Mech Integrity Test
SAPC PBU Pads S, M, U,
R, N, T, Y, H, F, X
Prudhoe Oil Pool
Wednesday, November 19, 1986: The tests began at 7:00 a.m. and
were concluded for the day at 4:30 p.m. with 10 wells being tested.
Thursday, November 20~ 1986: The tests began at 7:00 a.m. and were
concluded for the day at 7:00 p.m. with 14 wells being tested.
Friday, November 21, 1986: The tests began at 6:30 a.m. and were
concluded for the day at 4:30 p.m. with 10' wells being tested.
Saturday~ November 22, 1986: The tests began at 6:30 a.m. and were
concluded at 1:00 p.m.; and were resumed at 6:00 p.m. and concluded
for the day at 9:00 p.m. ~ O~.
As the attached mechanical integrity test ~ports show, 3'9~Te't'l's
were tested, all of which met the~AOGOC regulations.
In summary, I witnessed the mechanical integrity tests on Standard
Alaska Production Company's injections wells listed on the attached
test forms.
Attachments
ALASKA OIL AND GAS CONSERVATION CObIMISSION
MECHANICAL INTEGRITY TEST
P~ START 15 MINi 30 M-IN
*P *I TYPE OF PKR CASING TBG REQ TBG TIbM TI~M TIME
W~J. *S --- ANNULUS TVD SIZE/WT/GRADE SIZE TEST CSG TBG TBG TBG CCI4MENTS
'I4 *Iq FLUID MD PRESS PRESS CSG CSG CSG
PRESS PRF~S PRESS
% ,/~Cr" / ~4', t ,z,'-~O '/////////,d~ :]
.¢ ~ a_ ~.~?. q~ I~ 6~0 z~,aF' /~'-'.- /~.~o
,, C ,,-'¢/ 0
, 181 ~g , , r-
*TUBING INJECTION FLUID: ANNULAR FLUID: GRADIENT: AOGCC WITNESS SIGNATURE
SALT WATER Ihtl GLYCOL CEI~PANY REP SI~
IlqJECI'It~ DRTrLIlqG ~ 20 AAC 25.030(a)
NOT ~ OTHER 20 AAC 25.412(c)
~ 20 AAC 25.252(d)
Stondotd
P,od,x,,o. Co,~
900 Eo~ Ben~o,~
PO Bo. 196612
Ar~choroge Alo,,ko 9~.519 6612
f907) .564 5l I I
INDEXED
DALLAS
ARCO
CHEVRON
EY~XON
TEXACO Date: 10/15/86
TO: MOBIL Ti: 77413
PHILLIPS
~ STATE "OF' ALASKA
GEOSCIENCES
STANDARD
Al ASFA PPODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge recelpt by
signing a copy of thls letter and returning it to this office: -
-38
-16
-10
-15
-20
M-5
R-26A
R-27
-~U-4
¥-3
CCL/Perf. 09/29/86 ~Jl 9800-11132 GO 5"
Temp/Flow Meter 10/01/86 fi2 9300-9700 Camco 5"
Injection Profile 9/25/86 ~Jl 11150-11450 Camco 5"
Temp. 10/02/86 ~J2 2000-10~ P5 Camco 5"
Temp/Pump-in 10/04/$4 ~Jl 9800-10200 Camco 5"
Temp/Permaf rost 10/03/8t ~1 Surf-220C Camco 5"
Temp. 09/19/86 ~J- 11100-11728 Otis 5"
CCL/Perf. 10/08/86 ~Jl 7700-9619 GO 5"
CCL/Perf. 10/06/86 ~Jl-2 8500-9750 GO 5"
Injection Profile 09/24/86 ~1 11300-11680 Camco 5"
Injection Profile 9/26-28/86 tJl 9050-9500 Camco 5"
Received
Date
~ Vig~t~ria Aldridge
I N: i' ' I ON CONTROL
We I Recorcs LR2-1
Founded ,n Cl~.-e. tond C~,o
Stonclo~d AJo~ko
P~ocluct~on Coml)o~ /
PO ~. 19~12~
Ancho,oge Alosko ~196612
(~7) 5643111
TO:
DALI,AS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OFALAS}.~
GEOSCIENCES (Transmittal Only)
INDEXED
STANDARD
ALASKA PRODUCTION
Date: 10/07/86
TI: 77386
REFERENCE:
SJLPC FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this leJ-~er and returning It to thls office:
~'~ C-2 Static Gradient 09/12/86 Camco
-~' C-38 " " 09/14/86 "
E-1 " " 09/29/86 "
G-3 " " 09/13/86 "
H-8 " " 09; 11/86 "
K-4 " ', 09/09/86 "
M-25 " " 09/19/86 "
Q-3 " " 09/!0/86 "
S-3 " " 09/17/86 "
¥-3 " " 09/26/86 "
¥-22 " " 09/19/86 ':
Victoria Aldridge
INFOrMaTION CONTROL
Well Records LR2-1
SOHIO ALASKA PETROLEUM COMPANY
SI'O
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TE:OkCO
(-Marathon) MOBIL
PHILLIPS
STATE OF AK
BPAE
3 I I I "C" STR£ET
ANCHORAGI~. ALASKA
TELEPHONE (907l 265-0000
MAIL POUCH 6-6 ! 2
ANCHORAGt~. ALASKA 99502
Date:
TI/:
12-12-85
76630
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please ecknowledge receipt by signing a
copy of this letter and returning it to this office:-
SFO/UNIT/STATE:
~"B-5 ~ 11-09-85 CH-CNL 10860-11874 Sch g5 5"
~B-17-'" 11-04-85 CNL 10250-11242 Sch gl 5"
._~'C-3~ 10-27-85 EPL 9800-10140 Sch gl 2"
~"C-13.,," 11-08-85 CH-CN~. 10390-11454 Sch 5"
'"E-5 11-01-85 CNL 9300-10001 Sch #1 5"
~'~-10" 10-30-85 CNL 9200-10026 Sch g3 5"
'~H-5-~ 11-07-85°' Tie-In Log 9430-10100 Sch 5"
~X-5'/ 11-16-85 Gradiomanometer 9900-10735 Sob gl 5"
~X-6~~ 10-31-85 EPL 12150-13000 Sch gl 5"
~¥-3 11-02-85 EPL 9100-9550 Sch gl 5"
RECEIVED
Cathy Perkins LR 2-1
Technical Documentation
Records Management
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
November 14, 1985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention' Mr. C.V Chatterton
Well'Y-3 (14-27-11-13) PBU
Gentlemen:
Enclosed in duplicate, is Form lO-q.03' Sundry Notices and Reports on
Wells' for the above-named well This contains our subsequent
report of convertin§ this fro~l an oil well into an injection well'
MDM/~~/~~~'/O639N
Enclosures
Yours very truly,
Michael D. Martin
Senior Petroleum Engineer
CC'
T. N. Tyler, (MBg-2)
Well Records, (LR2-1)
Drilling Well File #17
RECEIVED
Ataska Oil & Gas Cons. Commissio~]
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION CO MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL [] COMPLETED WELL~3
2 Name of Operator 7 Permit No
SOHIO ALASKA PETROLEUM COMPANY 79-88
OTHER []
3 Address
P.O. Box 6612, Anchorage, Alaska 99502
4 Locauon of Well
At Surface:
1250'SNL, 4732'WEL, Sec.
34, TllN, R13E, UPM
8. APl Number
50- 029-20411
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-3 (14-27-11-13) PBU
11 F~eld and Pool
Prudhoe Bay
5 Elevat,on,nfeet(ind~cateKB, DF, etc) I 6 LeaseDeslgnatlonandSermlNo Prudhoe Oil Pool
_ KBE = 80.62' AMSL . I ADL 28287
12 Check Appropr~ateBox lolnd~cate NatureofNot~ce, Report, orOtherData
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF.
(Submit ~n Tr~phcate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Sumulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report muluple completions on Form 10-407 with a subm,tted Form 10-407 for each compleuon )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
This well was converted into a water injection well on October 22, 1985.
being injected through the following perforations at 4spf:
9186' - 9191' BKB
9202' - 9216' BKB
9224' - 9238' BKB
9248' - 9276' BKB
9286' - 9316' BKB
Water is
F ECEiVED
t ov 8
Alaska 0il & 6as Cons, CoDrnlssi0~
Anchorage
Conditions of Approval, ~f any
to the best of my knowledge
T~tle SP~inr Pe~rnle~m ~mgin~e~
Approved by
By Order of
COMMISSIONER the Corniness,on
Date
Form 10-403
Rev 7-1-80
Submit "Intentions" ~n Triplicate
and "Subsequent Reports" ~n IDupl~cate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TE,Y-ACO
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
31 1 1 "C STREET
ANCHORAGE ALASKA
TELEPHONE 19071 265 0OOO
MAIL POUCH 6 612
ANCHORAGE. ALASKA 99502
Date: 11-15-85
T#: 76567
REFERENCE
SOHIO FINAL DATA- PRESSURE SURVEY DATA
The following material ms being submItted herewmth. Please acknowledge receipt by slgmng a
copy of thms letter and returmng It to th~s office:--
API#
437 10-31-85
411 11-01-85
Pressure Falloff & BHPD Sch
Step Rate Test ~1 & BHPD Sch
Step Rate Test #2/
RECEIVED
DATE
Cathy Perkins LR 2-1
Technical Documentation
Records Management
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-OO00
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 08/26/85
T#: 76403
REFERENCE
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following mate.al is being subrmtted herewith. Please acknowledge receipt by sigmng a
copy of this letter and returning it to this office:--
M-5 Static 08/11/85 Camco
M-10 Static 08/16/85 Camco
M-16 Static 08/11/85 Camco
M-19 Static 08/19/85 Camco
M-21 Static 08/15/85 Camco
N-9 Static 08/13/85 Camco
N-18 Static 08/17/85 Camco
R-8 Static 08/16/85 Camco
R-9 Static 08/08/85 Camco
R-12 Static 08/06/85 Camco
R-13 Static 08/17/85 Camco
R-16 Static 08/07/85 Camco
S-2 Static 08/07/85 Camco
S-3 PBU & BHPD 08/05/85 GO
S-8 PBU & BH~D 08/09/85 GO
S-8 Static 08/09/85 GO
U-2 Static 08/07/85 GO
Y-3 Flowing Gradient 08/10/85 Camco
Y-18 Flowing Gradient 08/12/85 Camco
RECEIVED
DATE
S'~ 0 ~i~-~_ Victoria Aldridge LR2-1
Gas C'.~,§ C0mmmsmnRecordsTechnicalManagementD°cumentati°n
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO: SFO/UNIT/STATE: TEXACO
(-.Marathon) MOBIL
PHILLIPS
STATE OF AK
BPAE
31 1 1 "C" STREEY'
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 8-15-85
T#: 76386
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Y-3
Y-6
Y-18
Temp Log 7-22-85 9050-9720 Camco #1 5"
DFT 7-29-85 10600-11357 Camco #1 5"
DFT 7-27-85 10750-11400 Camco #1 5"
RECEIVED
, s Lt{ 2-1
UG"~ ~ lge5 Technical Documentation
Records Management
Oil & ~s, Cons. Commission
Anchorag~
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
August 21, 1985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention' Mr. C.V. Chatterton
Wells A-3, A-8, A-16, A-27, B-13, H-9, U-3, U-9,
Y-3, Y-6, Y-11, and Y-18 PBU
Gentlemen'
Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above named wells. These contain our proposals to
convert them from oil wells into water injection wells.
Yours very truly,
Michael D. Martin
Sr. Petroleum Engineer
MDM :~~H:kkm
081 985:0639N
Enclosures
cc: T. N. Tyler
Well Records (LR2-1)
Well File #17
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WE L LYE3
OTHER []
2. Name of Operator
SOHT0 Alaska Petroleum Company
3. Address
P. O. Box 661 2, Anchorage, Alaska
99502
4. Location of Well
At Surface'
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
__ KBE = 80.62' AMgL
I 6
. Lease Designation and Serial No.
ADL ?R2R7
7. Permit No.
79-88
8. APl Number
SO~)2 9-2041 1
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
Y-3 (1 4-27-! 1-! 3)PRII
1 1. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
With reference to the previous Sundry Notices dated' December 17, 1980;
January 27, 1981; April 27, 1985; and July 3, 1985, for the perforation of Y-3 in
the 7" liner)it is intended to convert this Prudhoe Bay production well into a
seawater injection well for WPWZ Waterflood Project. Water will be injected
through perforations (4 spf) at:
9186' -- 9191' BKB
9202' -- 9216' BKB
9224' -- 9238' BKB
9248' -- 9276' BKB
9286' -- 931 6' BKB
1~I~1 hereby certify that the foregoi~and correct to the best of my knowledge.
The space below for Commission use
Conditions of APproval, if any:
Approved by COMMISSIONER
Approvect Cop)~
Returned
By Order of
the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL
PHILLIPS
BPAE (Transmit:tal Only.)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99 502
Date:
T#:
7-30-85
76344
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
A-5 ~"
M-17/
R-9 -~
R-24 ~
Y-3
7-17-85
7-12-85
7-13-85
7-10-85
7-18-85
7/4-5/85
7/1-3/85
7-22-85
Flowing Gradient Camco
Static Gradient Camco
Static Gradient Camco
Flowing Gradient Camco
Static Gradient Camco
Flowing Gradient/BHPD Camco
Flowing Gradient/BHPD camco
Static Gradient Camco
RECEIVED
DATE
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502~612
July 3, 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-3 (14-27-11-13) PBU
Gent lemen:
Enclosed, in duplicate, are the following forms for the above-named
well:
1. Form 10-407, Completion Report;
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
JAB:~H:elw
Yours very truly,
District Petroleum Engineer (Acting)
Enclosures
cc: T. N. Tyler
Well Records (LR2-1)
Drilling Well File #17
RECEIVED
J U L 0 1955
Alaska O~J & Gas Cops Comrn,ss~or~'"
Anchora~
At STATE OF ALASKA ~
" " ALASK ,L AND GAS CONSERVATION C(~ MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classlf,cat~on of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of c)P~ra't'or ..... 7' Perm,t Number
Sohio Alaska Petroleum Company 79-88
_
"3 Address ....... 8 APl Number
P. O. Box 6612, An_chorage, Alaska 99502 _ 50-029~20411 ....
4 Location of well at surface .- 9 Umt or Lease Name
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, gPM Prudhoe Bay Unit_
At TopProducmg Interva~ 10 Well Number
79' NSL, 5112' WEL, Sec. 27, TllN, R13E, UPM Y~3 (14~27~11-13)
At Total Depth 11 F,eld and Pool
, , 7_ TllN, R13E., gPM Prudhoe Bay
187' NSL, 5143~ WEL, ~ec. 2 '6 Prudhoe Oil Pool
5 Elevation m feet (md~cate KB, DF, etc )~ Lease Designation and Serial No
KBE = 80,62' AMST, ..... ADL 28287
.....
'"12 Date Spudded 13 Da,eTD Reached 14 Date Oomp,Susp o rAband ]15 W~te'r DePth, l f offshore ]16 No of Completions
6/30/80,, 7/29/80 1/4/81I feet MSLI One
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 D~rect~onal Survey ] 20 Depth where SSSV set 21 Thickness of Permafrost
]915'MD 9668'TVD 9772'MD 9525' ..TVD YES ~:] NO []I .. 2034 _feet. MD... 1950'
22 Type Electmc or Other Logs Run
)IL/BHCS/GR/SP, F_DC./CNL/GR/Ca!, RFT ~"~
23 CASING, LINER AND CEMEI~ITING 'RECORD "-
......
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
.,
~0',, x 30,'i Insulate![. COnduct,,r Surface .!ld' 36" 10 cu, .yas, concrete _.
[3 3/8" 72# L-80 Surface 2689~ _17.. 1/2" 3720 cu. ft. Permmfr,~st II ....
9 5/8" 47# L-80 Surface 8917~ 12 1/4" 1225 cu. ft. Class GJ133
7" .... 29# L-80 8419' 9915'... 8 1/2" .401 cu. ft. Class G
24 Perforations open to Production (MD+TVD of Top and Bottom and '"25 TUBING RECORD
, .
~nterval, s~ze and number) MI) TVDss SIZE DEPTH SET (MD) PACKER SET (MD)
?rudhoe Oil Pool Top: 9186' 8859' 4 1/2" 8465~ g~62'
Bottom: 9316' 8989'
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
~186'-9191 ' BKB (8859'-8864' TVDss) DEPTH I'~TIZRVAL (M'~) AM0[JN~ & KIND OF MATERIAL USED
~202'-9216' BKB (8875'-8889' TVDss) 9915~ 121 cu.ft. Class G w/18%
)224'-9238' BKB (8897'-8911' TVDss) and 1% friction rad,,cmr.
~248'-9276' BKB (8921'-8949' TVDss)
.....................
27 PRODUCTION TEST
, ,
Date First Production I Method of Operation (Flowing, gas lift, etc )
L/4/81] Flowing
Date of Test H~urs' Tested PRODUCTION FOR OI L-BBL -' GAS-MCF wATER-BBL CHOKE SIZE GAS-OI L RATIC~
:TEST PERIOD
, , ,
FI°w Tub,ng Cas,ng Pressure CALCULATED OIL-BBL GAs-McF~ WATER-BBL OIL GRAVITY-APl (corr)' - -
Press 24-HOUR RATE
28 CORE DATA
Beef descmpt~on of I'~tl~ology, porosity, fractures, apparent d~ps and presence of' od, gas or water Submit core ch~ps
None RECEIVED
d u L 0
Alaska 0il & Gas Cons. Commission
Anchorage
rost
Form 10-407 Submit ~n duphcate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
29 30
GEOLOGIC MARKERS FORMATION TESTS
NAME . . Include interval tested, pressure data, all flu,ds recovered andgrav~t¥.
MEAS DEPTH TRUEVERT DEPTH GOR, and tlme of each phase
BKB Subsea
Sag R SST 8832' 8751'
Shublik 8855 ' 8775 '
Ivishak 8937 ' 8856 '
31 LIST OF ATTACHMENTS
_
3.2 I hereby certify that the foregoing is true and correct to the best of my knowledge
]~ ~~~~ Acting District ~//~/~,.__
_ //--//2' / /- .,,
INSTRUCTIONS
General' This form ~s designed for submitting a complete and correct well completion report and log on
all types of lands and leases ~n Alaska.
Item 1. Classification of Serwce Wells Gas injection, water injection, steam injection, air ~nject~on, salt
water dmposal, water supply for ~nject~on, observation, ~nject~on for in-situ combustion.
Item 5' Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements
g~ven ~n other spaces on this form and ~n any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and ~n ~tem 24 show the producing intervals for only the interval reported
in ~tem 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such ~nterval.
Item 21 Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27. Method of Operation Flowing, Gas L~ft, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28 If no cores taken, indicate "none"
Form 10-407
~r STATE OF ALASKA O~
ALASKA OIL AND GAS CONSERVATION C MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
I DRILLING WELL [] COMPLETED WELL;E] OTHER []
2 Name of Operator 7 Permit No
Sohio Alaska Petroleum Company 79-88
3 Address 8 APl Number
P.O. Box 6612, Anchorage, Alaska 99502 50-029~20411
4 Location of Well
At Surface:
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
5 Elevation in feet (indicate KB, DF, etc)
KBE = 80.62' AMSL
I 6. Lease Demgnat~on and Serial No
ADL 28287
12
9. Umt or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-3 (14-27~11~13.) PBU
11 F~eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropmate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF'
(Submit ~n Tnphcate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~nclud.ng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following additional intervals were perforated June 7, 1985 using Gearhart
3 1/8" carrier guns at 4 s.p.f.
A lubricator was installed and tested to 3500 ps~ on all well work.
9248'-9276' BKB (Ref. BHCS/GR, 7/12/80)
9286'-9316' BKB ( " )
An SSSV was set and tested in the ball valve nipple at 2034'.
edeby cert~,fy that the foregoing is true and correct to the best of my knowledge
T~tle 9et:rnl ~c~111~1
The spa e~elow for c;mm,sslon uSe ~ 0
Cond~t(o~ of Approval, ~f any
v
RECEIVED
J U L 0 9 ].~15,5
Alaska 0~1 & Gas Cons. Commission
Anchorage
By Order of
Approved by. COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1-80
SubmIt "Intentions" in Tmpl~cate
and "Subsequent Reports" in Duplicate
!
' ("' STATE O1: ALASKA ~V~'M
ALASKA OIL AND GAS CONSERVATION CO ISSlON
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIO
Drdhng well [] Workover operation []
2 Name of operator 7 Permit No
Sohio Alaska Petroleum Company 79-88
3 Address 8 APl Number
P. O. Box ~612, Anchorage, Alaska 99502 50-029-20411
4 Location of Well
at surface
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
5 Elevation ~n feet (~nd~cate KB, DF, etc )
KBE = 80.62' AMSL
I6 Lease Designation and Semal No
ADL 28287
9 Un,t or Lease Name
Prudhoe Bay Unit
10 Well No
Y-3 (14-27-11-13) PBU
11 F~eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of June ,19 85
12 Depth at end of month, footage drdled, fmh~ng jobs, d~rect~onal drdhng problems, spud date, remarks
13 Casing or liner run and quantities of cement, results of pressure tests
14 Coring resume and bmef descmptlon
15 Logs run and depth where run
16 DSTdata, perforat,ngdata, shows of H2S, m,scellaneousdata REef_ v
See Attached. JUL 0 9 1985
Alaska 0~l & Gas Cons. o0mmisslon
Anch0rag3
lNereb¥ certify that the foregoing is true and correct to the bes~ of my knowl~ge
,~ J ~ Acting District
D ~~ /~J J ~ TITLE Petroleum Engineer. DATE
Od and ~ Conservation Comm~smon by the 15th of the succe~ng month, unless otherwme d~r~ted
Form 10~04 Submit m du~hcate
Rev 7-1-80
PERFORATING DATA - Well Y-3 (14-27-11-13) PBU
June 7, 1985:
Rigged up Gearhart and perforated the
following additional intervals using
3 1/8" carrier guns at 4 spf:
9248'-9276' ~B (Ref. BHCS/GR, 7/12/80)
9286'-9316' ~(B ( " )
Put well on production.
June 9, 1985:
Set and tested SSSV in ball valve nipple
at 2034'.
Well on production.
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561 5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
May 9, 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Wells B-16, N-12, Y-3, Y-5 and Y-6 PBU
Attention: Mr. C. V. Chatterton
Gentlemen:
Enclosed, in duplicate is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our subsequents to
performing EDTA treatments on these wells.
Yours very truly,
J. A. Bragg
District Petroleum Engineer (Acting)
EnclOsure
cc: A. E. Leske
Well Records (LR2-1)
Drilling Well File #17
I(EC[IVED
MAY 1 5 1985
Alaska 011 & Gas Cons. Commission
Anchorage
STATE OF ALASKA ~¢
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL []
COMPLETED WELL []
OTHER []
2 Name of Operator
Sohio Alaska Petroleum Company
3. Address
P. O. Box 6612, Anchorage, Alaska 99502
4 L~atlon of Well
At Surface:
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E UPM
5. Elevation in feet (indicate KB, DF, etc )
KBE = 80.62' AMSL-
I 6
. Lease Designation and Serial No
ADL 28287
7 Permit No
79-RR
8 APl Number
5o-029-20611
9 Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
Y-3 (14-27-11-13) PBU
11. F,eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altersng Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion )
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170).
The following intervals in this well were treated with 100 barrels of EDTA solution
April 11, 1985. The treatment was conducted through coiled tubing as a single
stage job and the well was shut in for 24 hours after the treatment. The SSSV was
removed prior to stimulation and reset after the job at 2034.
9186' - ~191' BKB (Ref. BHCS/GR, 7-12-80)
9202' - 9216' BKB ( " )
9224' - 9238' BKB ( " )
t ECEIVED
MAY 1 5 1985
Alaska 0il & Gas Cons. Commission
Anchorage
~ 14 I hereby certify that the foregoing
~The space below for Commission use
corr~t to the best of my knowl~ge
Acting District
Vme Petroleum Engineer
Conditions of Approval, if any
Approved by,
By Order of
COMMISSIONER the CommIssIon
Date
Form 10-403
Rev 7-1-80
Submit "IntentIons" ~r3 Tr,phcate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY ,,
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
April 25, 1985
Alaska Oil and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Wells A-3, A-8, A-11~ A-27, B-9, H-9,
Y-3~ Y-5, Y-6, Y-11~ Y-18
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our proposals to
perforate additional intervals in these wells.
JAB/.~H~/jmw
Enclosures
Yours very truly,
JA;t~gB;~gsgtrict Petroleum Engineer
cc: A. E. Leske
Well Records (LR2-1)
Drilling Well File %17
RECEIVED
APR 0 1985
Alaska 0il & Gas Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION C MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL []
OTHER []
2 Name of Operator 7 Permit No
Sohio Alaska Petroleum Company 79-88
3 Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20411
4 Location of Well
At Surface:
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
5 Elevation in feet (indicate KB, DF, etc )
KBE = 80.62' AMSL
6 Lease Designation and Serml No
ADL 28287
9. Umt or Lease Name
Prudhoe Bay Unit
10. Well Number
Y-3 (14-27-11-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12
(Submit ~n Trlphcate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulhng Tubing
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF'
(Submit ~n Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludmg estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following additional intervals will be perforated in May/June, 1985.
A lubricator will be installed and tested to 3500 psi for all well work.
9248' - 9276' BKB (Ref. BHCS/GR, 7-12-80)
9286' - 9316' BKB ( " " )
An SSSV will be set and tested in the ball valve nipple at 2034',.
reby certify that the foregoing ~s true and correct to the best of my knowledge
~J~ned ~ T,tle Petroleum Engineer
T~e spac~t~elow for Commission use ' ~/
Cond~tl~l~'s of Approval, if any
Date
Approved by BT [0N~I[ C. ~_!T_~ COMMISSIONER
Approved Copy
Returned
By Order of
the Commission
Date
Form 10-403
Rev 7-1-80
Submit "Intentions" in Tr,pl,cate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612 /.~
March 26, 1985
Alaska Oil and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Wells A-3, A-16¢ Y-3 and Y-6 PBU
Attention: Mr. C. V. Chatterton
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells for the above-named wells. These contain our proposals to
perform EDTA matrix treatments on these wells.
JAB/i H/jmw
Enclosures
Yours very truly,
· A. Bra
Petroleum Engineer (Acting)
cc: A. E. Leske
Well Records (LR2-1)
Drilling Well File ~17
RECEIVED
2 9 1985
Alaska Oil & Gas Cons. comrms':~on
Anchorage
STATE OF ALASKA ('
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL [] COMPLETED WELL [] OTHER []
-2 Name of Operator 7 Permit No
Sohio Alaska Petroleum Company 79-88
3 Address 8 APl Number
P. O. Box 6612, Anchorage, Alaska 99502 , 50-029-20411
4 Location of Well 9 Umt or Lease Name
At Surface: Prudhoe Bay Unit
10 Well Number
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM Y-3 (14-27-11-13) PBU
11 F~eld and Pool
Prudhoe Bay
5 Elevation in feet hndlcate KB, DF, etc ) I 6 Lease Demgnat,on and Semal No Prudhoe Oil Pool
KBE = 80.62' AMSLI ADL 28287
12 Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF'
(Submit ~n Tmpl~cate) (Submit m Duplmate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [~ Abandon [] Stimulation [] Abandonment []
Repmr Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13. Descmbe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludmg estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals in this well will be treated with 100 Bbls of EDTA
solution during April/May, 1985. The treatment will be conducted through
coiled tubing as a single stage job and the well will be shut-in for 24 hours
after the treatment. The SSSV will be removed prior to stimulation and reset
after the job at 2034'.
9186'-9191' BKB (Ref. BHCS/GR, 7-12-80)
9202'-9216' BKB ( " )
9224'-9238' BKB ( " )
RECE \!ED
A!aska 0~! & Gas Corm.
Anchorag9
~~ent Work t~ev~.,ortecl
1~ I hereby certify that the f~oregmng ~s true and correct to the best of my knowledge
S ned l~tle Petroleum Engineer Date
Condi~__~ns of Approval, ,f.~n~ ~--,.proved~atUrll~[.~.
1~ (l],~{IE C. SIlTI By Order of
Approved by COMMISSIONER the Commms,on Date ~ '-/
,,.
Form 10-403
Rev 7-1 ~80
Submit "Intentions" in Tr~phcate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
To. SFO/UNIT/STATE: GETTY
(-Marathon) MOBIL
PHILLIPS
3111 "C" SIREET
ANCHORAGE. ALASKA
TELEPHONE {9071 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99.502
Date: 10-20-82
Trans.#: 2753
CC~ :_. q 575q
BPAE (Transmittal Only)
CENTRAL FILES (CC~'s - Transmittal Only)
REFERENCE:
/
/~OH_IO FIN___~__ DA__~TA_- PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
E-21-'. Pressure Survey 9-22-82 Camco
M-15'/ Pressure Survey & BHPD 9-1-82 GO
E-17'~ Pressure Survey 9-4-82 GO
E-18/ Pressure Survey 9-17-82 GO
E-17-' Pressure Survey & BHPD 9-24-82 Otis
G-18-- Pressure Survey & BHPD 9-25-82 GO
G-3 ~ Pressure Survey & BHPD 9-23-82 GO
Y-13-~ Pressure Survey & BHPD 9-20-82 GO
C-10" Pressure Survey & BHPD 9-14-82 Camco
Y-3 ~' Pressure Survey 9~9~82 Camco
A-5 ~ Pressure Survey & BHPD 10-8~82 GO
N-7~-/ Pressure Survey & BHPD 10-11~82 Camco
M-5 '~
Pressure Survey & BHPD 10-11-82 Camco
(4/82)
RECEIVED
,DATE
Karen Mestas
Development Geology
Well Records
D
SOHIO ALASKA PETROLEUM COMPANY
S¥0
ARCO
- CHEVRON
EXXON
GETTY
To SFO/UNIT/STATE:
(-Marathon) MOBIL __
BPA~it tal Only)
CENTRAL FILES (CC#' s-Transmit tal Only)_
31 11 "C STREET
ANCHORAG_E ALASKA
TELEPHONE (907) 265-0000
MAIL' POUCH 6-612
ANCHORAGE, ALASKA 99502
Date:
Trans.#:
CC#:
4/12/82
1491
49491
REFERENCE
~OHIO CASED HOLE~ FINAL LOGS
/ The follow~ng material isbe~ngsubm~ttedherewith Please acknowledge receipt by signing a
copy of this letter and returning it to thins ofhce --
-sFo/~Ni~/STATE- (-Marathon):
Y-3 DFT (GO) #1 5" 3/12/82
D-4 DFT (GO) #1 5" 3/30/82
D-4 BH Audio Tracer (GO) #1 5" 3/30/82
Survey 5'
C-il Spinner (Otis) #- ' 2/27/82
~C~,VE .... A~~ I ~ ]~82 Development Geology
is ___ Well Records
DA~E A!~SKa 0~l & Gas Cons C0~n..)~,.'!or,
SOHIO RESTRICTED
SOHIO ALASKA PETROLEUM COMPANY
ARCO
TO
SFO/UNIT/ST:
[:~lh~ ....... --
BPAE T__r~_n?.mit,t,a,,1 Only _
lndLxed
311 1 C" STREET
ANCHORAGE. ALASKA
T[LEPHONE {907) 265-0000
MAIL POUCH 6-612
ANCHORAGE ALASKA 99502
Date: 3/3/82 # 1405
REFERENCE
SOHIO FINAL DATA
he following mate.al fs being submitted herew,th. Please acknowledge receipt by s~gn,ng a
copy of th~s letter and returmng It to th~s office.-
SFO/UNIT/STATE: MUDLOGS (Open Hole)
Chev. Track Well 23-18-11-12 Mudlog 2" 10/26-12/11/80 (Analysts/Sch) 2700-10905'
Y-3 . Mudlog 2" 6/30-7/29/80 (Analysts/Sch) 90-9915'
(I can't be sure these mudlogs were issued previously, therefore I am sending these
out to assure everyone has their logs with transmittals on record.)
SFO/UNIT/STATE'
(-Marathon)
PRESSURE SURVEYS
B-6 Pressure Survey & BHPD (Otis) 2/19/82
C-5/' " " " (Sch) 2/13/82
D-5/ " " " (Sch) 2/8/82
D-6/ " " ", (Sch) 2/11/82
H-7~ " " " (Go) 2/9/82
8~' ,, ,, ,,
H- / (Sch) 2/10/82
q-2 " " " (Sch) 2/16/82
Q-4 / " " " (Sch) 2/17/82
q
a rieter
~c,~]m ±opment Geology
' ~ktt'l F ~ccrds
SOHIO PETROLEUM COMPANY
Div,s~on of Sohio Natural Re~urces Company
3111 "C" STREET
ANCHORAGE, ALASKA
SOHIO-BP ALASKA PRODUCTION DIVISION
TELEPHONE (907) 265-0000
MAIL. POUCH 6-612
ANCHORAGE, ALASKA 99502
TO
S FO/UNIT / STATE:
SFO .... -- - --
3/9/81 #654
REFERENCE
SOHIO FINAL DATA
/ollowlng material ~s being submitted herewIth. Please acknowledge receipt by sIgning a
copy of th~s letter and returnmg ~t to th~s office:-
SFO/UNIT/STATE: B-8 CNL 11/21/80 #3
(-Marathon) E-2 CNL 12/8/80 #6
F-4 CNL 2/13/81 #6
J-3 CNL 11/21/80 #1
MM Track We11(13)15-11-12 CNL 2/20/81 #3
D-15 Spinner Flowmeter 2/19/81 #1
-'~ Spinner 2/14/81 #1
SFO/UNIT/ MM Trackwell(22)31-11-13 FDC/CNL 2/1/81 & 2/7/81 #1&2
STATE: bfP Trackwell(22)31-11-13 FDC 2/1/81 & 2/7/81 #1&2
5" (see remark
5" on this se
5" of logs.)
5"
5~,
5"
5,~
2"
2"
Well Records
SOHIO PETROLEUM COMPANY
D~v~sion of Sohio Natural Resources Company
A,nC0
SOHIO-BP ALASKA PRODUCTION DIVISION C~-~rr~
TO
SFO/UNIT/STATE:
Mobd ~
SFO
SEATTLE
REFERENCE
COL';
C_O_~,~ '
3111 "C" STREET
ANCHORAGE. ALASKA I~..,-i 2 E
TELEPHONE (907)265 000~-
MAIL POUCH 6612
ANCHORAGE. ALASKA 99~- 2
2/24/81 #638A
~O~FER
,LF:,-
SOHIO DATA
.
////The following material is being submitted herewith. Please acknowledge receipt by s~gning a
copy of th~s letter and returning ~t to th~s off~_ce:- _ ...... , ........
SFO/L~IT / STATE:
(-Marathon)
SFO/UNIT/STATE:
(-Marathon)
F-4
R-6
RECEIVED
II I1 II I!
BottomHole Pressure Data Form & Survey
I!
CH CNL 2/i/80
EPL i/25/8i
, ] C-EI EI)
FEB ?
Alaska 0il & Gas Cons C0mmissio.
2/4/81 (Camco)
2/14/81(Go)
#5 5"
#1 5"
Carol Krieter
Well Records
Con't...
DATE 19
SOHIO ALASKA PETROLEUM COMPANY
January 26, 1981
- I RES-EN~
! I 1ENG__..~'--..
3111 "C" ST ' E E~-~G-
L L 4 ENG I
TELEPHONE (~01)26~-~0~O~
MAIL POUC~6-~I~
A~CHOR~,
I-I STATTE~
C~ID~
FILr:
Alaska Oil & Gas Conservation Ogmmission
3001 Porcupine Drive -
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
RE: Wells X-7, X-8, Y-3
~ntle~n:
Enclose, in duplicate, are Me foll~ing for~ for the ~ve-
referenced wells:
1. Fo~ 10-407, ~letion Re~rt;
2. Form 10-403, Sundry Notices & Re~rts on Wells;
3. Form 10-404, Monthly Re~rt of Drilli~ & Workover ~rations.
~:~lZng ineer
GJP:JLH: ja
Enclosures
CC:
Well File #17
S. R. Bundy
A. E. Leske
Geology
~' I' STATE OF ALASKA 1'
ALASKAt,..,.AND GAS CONSERVATION C~..,MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
I Status of Well Classlf,cat~on of Service Well
OIL r~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
;2 Name of Operator 7 Permit Number
Sohio Alaska Petroleum ~y 79-88
3 Address B APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20411
4 Location of well at surface 9 Unit or Lease Name
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM Prudhoe Bay Unit
At Top Producing Interval 10 Well Number
79' NSL, 5112' WEL, Sec. 27, TllN, R13E, UPM Y-3 (14-27-11-13)
At Total Depth 11 F~eld and Pool
187' NSL, 5143' WEL, Sec. 27, TllN, R13E, UPM Prudhoe Bay
5 Elevation in feet (indicate KB, DF, etc ) I 6 Lease Des,gnat,on and Der,al No Prudhoe Oil Pool
KBE = 80.62' AMSLI ADL 28287
12 Date Spudded6/30/80 13 Date T D Reached7/29/80 14 Date C°mp 'Susp °r Aband [ 15 Water Depth' If °ffsh°re I 16 N° °f C°mpletl°ns1/4/81, feet MSL one
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+-I-VD) 19 D~rect~onal Survey I 20 Depth where SSSV set 21 Thickness of Permafrost
9915'MD 9668'TVD 9772'MD 9525'TVD YES[~ NO~qI 2034 feetMD 1950' GL
22 Type Electric or Other Logs Run
DIL/BHCS/GR/SP, FDC/CNL/GR/Cal, RFf
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulated Conducto :Surface 110 ' 36" 10 cu.vds, concrete
13 3/8" 729 L-80 Surface 2689' 17 1/2" 3720 cu.ft. Permafrc st II
9 5/8" 47~ L-80 Surface 8917' 12 1/4" 1225 cu.ft. Class G: ]
7" 29~ L-80 8419' 9915' 8 1/2" 401 cu,ft, Class G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
,
interval, size and number) MD TVD SIZE DEPTH SET (MD) PACKER SET (MD)
Prudhoe Oil Pool: Top: 9186' 8940' 4 1/2" R465' R3~'
Bottom: 9238' 8992'
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
9186-9191'BKB 0.5"@4spf (Ref.B:HCS/GR, 7/29/80) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9915' 121 cu.ft. Class G w/18% sal
79202-9216'BKB " " ( " ) ~x/ ~'r'~ and 1% friction reducer
.~9224T9238'BKB" " ( " )
,,
27 PRODUCTION TEST
Dat. e-/~~tlon ' ' l Method of Operation (Flowing, gas lift, etc )
( z/4/8
Flowing
Date of-Test Hours Tested PRODUCTION FOR OIL-BBL GASoMCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
~ TEST PERIOD ~
Flow, Tubing Casing Pressure :CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Pres~ 24-HOUR RATE [~
28 CORE DATA
-Brief description of llthology, porosity, fractures, apparent dips and presence of oil, gas or water Submit core chips
, · ~ Alaska 0,I & O~_' Cans, Commission
Form 10-407 Submit ~n duplicate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
..
29 30
GEOLOGIC MARKERS FORMATION TESTS
..,
NAME Include ,nterval tested, pressure data, all flu,ds recovered and gravity,
MEAS DEPTH TRUEVERT DEPTH GOR, and t~rne of each phase
BKB Subsea
Sag R. SST. 8832' 8751'
Shublik 8855' 8775'
Ivishak 8937 ' 8856 '
31 LIST OF ATTACHMENTS
None [t ~_ ,,
I herebycert, ha theforego~ng tr e and correct to the best of my knowledge
S,gn T,tle District Field Date '/~ ?/~'
_ ! ~._ ,lL l~l i.~oa (% l=l, noineer
INSTRUCTIONS
General' Th~s form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases ~n Alaska.
Item 1 Classification of Service Wells: Gas injection, water ~njection, steam injection, air injection, salt
water disposal, water supply for ~njection, observation, injection for in-s~tu combustion.
Item 5 Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given ~n other spaces on this form and in any attachments.
Item 16 and 24 If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing ~ntervals for only the interval reported
~n ~tem 27 Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21 Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23 Attached supplemental records for this well should show the details of any multiple stage cement-
~ng and the location of the cementing tool.
Item 27 Method of Operation Flowing, Gas L~ft, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28 If no cores taken, indicate "none".
Form 10-407
(j STATE OF ALASKA C.(~M
ALASKA ~LAND GAS CONSERVATION MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL [] COMPLETED WELL [] OTHER []
2 Name of Operator 7 Permit No.
Sohio Alaska Petroleum Company 79-88
3 Address
Pouch 6-612, Anchorage, Alaska
4 Location of Well
99502
At surface:
1250' SNL, 4732' WEL, Sec. 27, TllN, R13E, UPM
8 APl Number
50-029-20411
9 Unit or Lease Name
Prudhoe Bay Unit
10 Well Number
¥-3 (14-27-11-13)
11 Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
5. Elevation ~n feet (ind~cate KB, DF, etc ) I 6 Lease Designation and Serial No
KBE = 80.62' AMSL I ADL 28287
, ,,,~ ~ ..... ,,
12 Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF
(Submit ~n Tnphcate)
Perforate [] Alter Casing [] . Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulhng Tubing
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
(Submit ~n Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13 Describe Proposed or Completed Operations (Clearly state all pertinent details and g~ve pertinent dates. ~ncludlng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals were perforated on January 4, 1981, using Dresser Atlas
3 1/8" carrier guns at 4 spf:
9186' -9191' BKB (Ref. BHCS/GR, 7/12/80)
9202' - 9216' BKB ( " )
9224' - 9238' BKB ( " )
An SSSVwas set and tested in the ball valve nipple ca. 2000'.
14 I hereb rt y that the f regmng ~s true and correct to the best of my knowledge
S,gn T,tleD'~$trict Field Engineer
The (~.~ce below f~r~omm,ss,on use
0il & ~ ' e~.;, ~
Date
Conditions of Approval, ~f any
By Order of
Approved by, COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duphcate
STATE OF ALASKA
ALASKA( L AND GAS CONSERVATION C(~ ,MISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
Drdhng well [] Workover operation []
2 Name of operator 7 Perm,t No
Sohio Alaska Petroleum Company 79-88
3 Address 8 APl Number
:Pouch 6-612, Anchorage, Alaska 99502 50- 029-20411
4 Location of Well
at surface
1250' SNL, 4732' WEL, Sec. 34, TllN, ~3E, UPM
5 Elevation ~n feet (~nd~cate KB, DF, etc ) 6 Lease Designation and Serial No
KBE = 80.62' AMSL ADL 28287
9 umt or Lease Name
Prudhoe Bay Unit
10 Well No
Y-3 (14-27-11-13)
11 F,eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of January
,1981
12 Depth at end of month, footage drdled, fishing jobs, d~rect~onal drdl~ng problems, spud date, remarks
13 Casing or I~ner run and quantities of cement, results of pressur9 tests
14 Coring resume and brief description
15 Logs run and depth where run
,1 6 DST data, perforating data, shows of H2S, m~scellaneous data
See attachment
7IN~~~I hereb ceit~f e foregoing ~s true and correct to the best of my knowledge
SIG/ o n t't.~ requlr~ ~' TITLE District Field EnQineer DATE ,/~l._~/t~I/"3/1'-'~.
NOT~--Report form is for each calendar month, regardless of the status of operations, and must be filed lin duph(~ate with
Od an-~ Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed
Form 10-404
Rev 7-1-80
the Alaska
Submit ~n duphcate
PERFORATING DATA - WET.T. Y-3 (14-27-11-13)
December 29, 1980: Pressure tested tubing and inner annulus.
January 4, 1981:
Rigged up Dresser Atlas and perforated the following
intervals using 3 1/8" carrier guns at 4 spf:
9186' -9191' BKB (Ref. BHCS/GR, 7/12/80)
9202' - 9216' BKB ( " )
9224' - 9238' BKB ( " )
Put well on production.
January 16, 1981: Shut well in to prepare for static pressure survey.
January 18, 1981: Ran static pressure/temperature survey at 8800' TVDss.
January 19, 1981:
Set and tested SSSV in ball valve nipple ca. 2000' TVDss.
Well on production.
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO
STATE OF ALASKA
l.Fco=
311~1 "C"STREET/ I 4 ENG
A.C.ORAGE. A'As eO
mA~L: ~ucH ~6~_ ~ sTAT
ANCHORAGE, ~L~SK~~STA1
12/26/80 l CO~FER:
ALASKA OIL & GAS CONCERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501
ATTN: MR. H. HAMILTON
REFERENCE
TRANSMISSION, CORE SAMPLES
/~....7~e following material is being submitted herewith. Please acknowledge receipt by signing a
~" copy of this letter and returning it to this office:-
CORE CHIP SAMPLES (WELLS Y-3 & J-12) PRUDHOE BAY, ALASKA (WEST OPPERATING AREA)
S f/-T~3 E
J-12
S 4-T 11 N-R 13 E
14 boxes of chips
intervals 90 70.0 -
982b.0
16 boxes of chips
intervals 9306.0-
10,160.0
Sent by,
Kevin A. Brown
RECEIVED
DATE ~ qeb0r~f~B 19 __
SOHIO PETROLEUM COMPANY
Y-3 CORE DATA
Core #
10
11
12
13
Interval Cut
(Drillers Depth)
9070-9129
9129-9189
9189-9249
9249-9308.3
9308.3-9368.2
9368.2-9407
9407-9465
9465-9525.2
9525.2-9585
9585-9645
9645-9705
9705-9765.3
9765.3-9725
Recovery (%)
58'8" (99.5)
59'10.5"(99.8)
60' (100)
59'4" (100)
59'10.8"(99.7)
34'9.5" (89.7)
58' (100)
60'2" (100.3)
59'9.5" (100)
60' (100)
60' (100)
60'3" (100.4)
61'3'~ (102)
General Lithology
Kingak Sh., Sag. River Sst., Shublik Fm.
Shublik limestone,Shaley limestone
Sadlerochit Sandstone
Sadlerochit Sandstone Good
Sadlerochit Sandstone . Good
Sadlerochit Sandstone, Conglomerate Good
Sadlerochit Conglomerate Good
Sadlerochit Sandstone, Conglomerate Good
Sadlerochit Sandstone, Conglomerate Good
Sadlerochit Sandstone, Conglomerate Good
Sadlerochit Sandstone, Conglomerate Good
Sadlerochit Sandstone Good
Sadlerochit Sandstone, Kavik Siltstone, Shale
Porosity
Variable
Negligible
Good
Fair-poor
Hydrocarbon
Indications
Well Drilled with
Oil Faze Mud
SOHIO ALASKA PETROLEUM COMPANY
December 16, 1980
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. H~qmilton
RE: Wells Y-3, J-13, X-10, X-II, X-12, X-13
Gentlemen:
Enclosed, in triplicate, are Forms 10-403, Sundry Notices
and Reports on Wells, for the above-referenced wells. These
notices contain our proposals to perforate the wells.
G~. js very truly,.
~ Distr ict~Pield Engineer
GJP: ~JI/4-: ja
Enclosures
cc: Well File #17 S. R. Bundy
A. E. Leske
Gas Cons. commission
/~rj STATE OF ALASKA C((.'
ALASK IL AND GAS CONSERVATION MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL ~ COMPLETED WELL [] OTHER []
2. Name of Operator 7 Permit No.
Sohio Alaska Petroleum Ccmpany 79-88
3 Address
Pouch 6-612, Anchorage, Alaska
4. Location of Well
99502
At surface: 1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
5. Elevation in feet (~nd~cate KB, DF, etc )
KBE = 80.62' AMSL
Lease Designation and Serml No
ADL 28287
12
8. APl Number
50-029-20411
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
Y-3 (14-27-11-13)
11 Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
(Submit ~n Tr~plmate) (Submit ~n Duplicate)
Perforate ~ Alter Casing [] ~ Perforations [] Altering Casing r-I
Stimulate [] Abandon [] Stimulation [] Abandonment [~
Repmr Well [] Change Plans [] Repmrs Made [] Other []
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting anY'
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals will be perforated during January/February, 1981, using
Dresser Atlas 3 1/8" carrier guns at 4 spf:
9186' - 9191' BKB (Ref. BHCS/GR, 7/12/80)
9202' - 9216' BKB ( " )
_ ( ,, )
SSSV will ~ set ~d test~ in ~e ~11 valve nipple ca. 2000'.
RECEIVED
on Form No. '~'- ~ Dated __//__~f'/2~ ~..
14 I he fy t true and correct to the best of my knowledge
s,~e~/ ~ ~ ~ ~,t,eDistrict Field mgineer
. The s~ce belo&or~m~,ss,on use G.~ Plisga
Cond,t,ons of Appro~f any ~[-.F~*--rOVc~
Approved by ~ ~~~ COMMISSIONER
Form 10-403 ~' -
Returned
By Order of
the Commas~on
DEC! 9 1980
Alaska Oil & Gas Cons. Commission
Anchorage
Submit "lntennons" ~n Tnphcate
Rev 7-1-80 and "Subsequent Reports" ~n Duplicate
¢
Well Y-3 (14-27-11-13)
WELL HISTORY
July, 1980
Spudded well at 1730 hours, June 30, 1980. Drilled 17 1/2" hole to 2700'.
Ran 69 jts. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with
3720 cu.ft. Permafrost II cement. Installed and tested BOPE. Cleaned out
to 2651', tested casing to 3000 psi, okay. Drilled out to 2730', ran leak-
off test to 0.733 psi/ft, gradient. Directionally drilled 12 1/4" hole to
8948'. Ran open hole logs. Ran 232 jts. 9 5/8" 47# L-80 Buttress casing
to 8917'. Cemented in two stages: First stage with 1225 cu.ft. Class G
cement with 1% friction reducer; second stage through DV packer at 2598'
with 133 cu.ft. Permafrost cement preceded by Arctic Pack. Cleaned out to
8875', tested casing to 3000 psi, okay~ Drilled out to 9070'. Cored 8 1/2"
hole to 9825'; recovered 751' in 13 cores. Directionally drilled 8 1/2" hole
to 99_~', ran open hole logs.
August, 1980
Ran 37 jts. 7" 29# L-80 Buttress casing to 9915'. Cemented with 401 cu.ft.
Class G cement with 18% salt and 1% friction reducer. Tested casing--no test.
Squeezed 7" shoe with 121 cu.ft. Class G cement. Cleaned out to 9775'. Tested
casing to 3000 psi, okay. Ran CBL. Changed well over to 9.6 ppg. NaCl. Ran
202 jts. 4 1/2" 12.6# Buttress tubing to 8465'. Landed tubing with ball valve
at 2034'. Installed and tested tree. Displaced tubing to diesel, set packer
at 83-~g~. Tested tubing to 3500 psi, okay. Released rig at 1500 hours,
August 7, 1980.
MM:ja
SOHIO PETROLEUM COMPANY
Divmon of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO
i i ~_
~ i i i i ii _ i i ~L
SFO/UNIT/STATE
(- Marathon)
REFERENCE
Mobd .........
Philhp, ......
.....
BPAE .........
SFO ~ ........
:.,, ..~.. s-,-.l~[-,-' ,..
ANCHORAGE, A~ASK~ ' '
~ 1 "~ ~_ _
TELEPHONE (907)~65~0~0-'~/~
' -- ~ C~ ~ -C
Ic°~-- /
[F~L~: 1
9/23/80 0375
SFO/UNIT / STATE
(-Marathon)
.~~TOhe~) FINAL CASED HOLE DATA
following mater~al is being submitted herewith. Please acknowledge receipt by s~gn~ng a
copy of this letter and returning ~t to this office:-
F-1 CNL ~'/ 8/13/80 #2 5"
q-1 CNL '/'" 8/15/80 #1 5"
Q-3 CNL -/' 8/15/80 #2 5"
X-1 EPL 8/8/80 #1 5"
EPL 8/10/80 #1 5"
~ Temp. Survey 8/22/80 #1
Well Records
RECEIVED
f,. .... ~-. ,,: .
DATE ,' ' " , 19
SOHIO-BP ALASKA PRODUCTION DIVISION
SOHIO PETROLEUM COMPANY / l~, I 2i~ ".,.-~... 3111 C STREET
/ ,,~?- .... .,..
D~v,s~on of Sohio Natural Resources Company ~.-~__~, '~: ; ~~ANCHORAGE. ALASKA
' ; .-~.-~ ~ TELEPHONE (907)265-0000
, 3G~O~ ~'~ ANCHORAGE ALASKA 99502
__
TO -~O~FER~ 9/8/80 f1345
~0~ ·
FILF: ~
PHILLIPS
SFO
REFERENCE
Sohio Magnetic Tapes
coy fOllowing material is being submitted herewith. Please acknowledge receipt by s~gn~ng a
of this letter and returning ~t to this office:-
C-16 Magnetic Tapes 6/7/80 f~l ~60600
,,,~:'~ ", " 7/29/80 (/~l&2 /t60714
Well Records
RECEi~'ED~-
DATE 19
SOHIO ALASKA PETROLEUM COMPANY
September 4, 1980
ANCHORAGE AL~A- ~,~ ,~;-~
ANCHORAGE, ALASKA ~
CONFIDENT~
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-3 (14-27-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-named well
for the month of August, 1980.
RHR: ja
Enclosures
cc: Well File #17
Yours very truly,
District Drilling Engineer
Form No. 10-404
REV. 3-1-'10
SUBMIT IN DUPLICATE
STA'I( )F ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
NAME OF OPERATOR
Sohio Alaska Petroleum Company
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL
At surface:
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
·
5 APl NUME~CAL CODE
50-029-20411
6 LEASE DESIGNATION AND SERIAL NO.
ADL 28287
7. IF INDIAN ALOTTEE OR TRIBE NAME
& UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
g-3 (14-27-11-13)
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
I 1 SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 27, TllN, R13E, UPM
12 PERMIT NO.
79-88
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
August, 1980
Ran 37 jts. 7" 29# L-80 Buttress casing to 9915'. Cemented with 401 cu.ft. Class G
cement with 18% salt and 1% friction reducer. Tested casing--no test. Squeezed 7"
shoe with 121 cu.ft. Class G cement. Cleaned out to 9772'. Tested casing to 3000
psi, okay. Ran C.~__~. Changed well over to NaC1. Ran 202 jts. 4 1/2" 12.6# Buttress
tubing to 8465'. Landed tubing with ball valve at 2034'. Installed and tested tree.
Displaced tubing to diesel, set packer at 8362'. Tested tubing to 3500 psi, okay.
Released rig at 1500 hours, August 7, 1980.
SIGNED II v --,,.~ ',,,a ~- - .,~ Distric~ Drilling Enginee~ATE ~. (. ~O
_. ak n. aa il~y TITLE
NOTE--~e~ on thia form is required for each calendar month, r~ardle~ of th~ ~atua o{ operation, and mu~ be filed in duplicate with th~
oil and ~a$ cona~ation committ~ by th~ ~Sth of th~ aucc~ing month, unl~ otherwis~ dir~t~.
SOHIO ALASKA PETROLEUM COMPANY
September 5, 1980
ANCHORAGE, AL~ ,SK~ ~ ~"
k- ~ I~
TELEPHONE (907)2~G: ~,_L ~
MAIL' POUCH 6~[-~ ~,~~
ANCHORAG E, ALAS~~~
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-3 (14-27-11-13)
Enclosed, in duplicate, is Form P-7, Completion Report, for
the above-named well together with the Well History, Well
Logs, Directional Surveys, and Core Data Sheet.
This well has been suspended pending perforating operations.
RHR:ja
Enclosures
cc: Well File #17
Geology
Yours very truly,
R. H. Reiley
District Drilling Engineer
Fo~m P--7
SUBMIT IN DUP , ~,TE*
STATE OF ALASKA (s~e ot,,er In-
structions on
reverse side)
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
la TYPE OF WELL OIL GAS r'"l
WELL [~] WELLLJ DRYE~ Other
b TYPE OF COMPLETION
NEW ~ WORKr--I DEEP-r--'I PLUG r'"l OlFF
WELLL_.~ OVERI I EN I I BACKI ! RESER I I Other
NAME OF OPERATOR
Sohio Alaska Petroleum Company
3 ADDRESS OF OPERATOR
Pouch 6-612, Anchoraqe, Alaska 99502
4 LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
At surface
1250' SNL, 4732' W'EL, Sec. 34, TllN, R13E, UPM
At top prod ,nterval reported below top Sag R. SST.
150' NSL, 5147' WEL, Sec. 27, TllN, R13E, UPM
At total depth
187' NSL, 5143' WEL, Sec. 27, TllN, R13E, UPM
5 APl NUMERICAL CODE
50-029-20411
6 LEASE DESIGNATION AND SERIAL NO
ADL 28287
7 IF INDIAN, ALLOTTEE OR TRIBE NAME
8 UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
¢14-27-11-13)
D AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
11 SEC ,T ,R , M , (BOTTOM HOLE
OBJECTIVE)
~ec. 27, TllN, R13E, UPM
12 PERMIT NO
79-88
6/30/80 7/29/80 8/7/80 KBE : 80.62' AMSL <~.,'1 50.89' AMSL
IN't'EI~VALS DRILLED BY
18 TOTAL DEPTH, MD & TVD ~19 PLUG BACK MD & TVDI20 IF MULTIPLE COMPL I
~ DEPTH t HOW MANY* ' 21 ROTARY TOOLS CABLE TOOLS
9915 'MD 9668'TVD { 9772'MD 9525'TVD { I Total
22 PRODUCING INTERVAL(S), OF THIS COMPLETION -TOP, BOTTOM, NAME (MD & TVD)* 23 WAS DIRECTIONAL
SURVEY MADE
None
Yes
24 TYPE ELECTRIC AND OTHER LOGS RUN
DIL/BHCS/GR/SP, FDC/CNL/GR/Cal, RFT
25 CASING RECORD (Report 'all strings set In well)
20"x30" Insulated 0onduct~r 110 36" 10 cu.¥ds, concrete
13 3/8" 72~ ! L-80 / 2689 17 1/2" 3720 cu. ft. Permafrost II
9 5/8" 47~ J T,-80 J 8917'J 12 1/4"J'i225 ~,].ft-_ C1....nn.~ C,, lql
· -,,, ' 2ee 1 -8o 8 ].>'2"I cu Class G
26 LINER RECORD
SIZE I TOP (MD) BOTTOM (MD)ISACKS CEMENT*
I
I
28 PERFORATIONS OPEN TO PRODUCTION (Interval, size and number)
None
30 PRODUCTION
AMOUNT PULLED
~-f~- P~rmafrost
J27 TUBING RECORD
SCREEN (MD) J SIZE J DEPTH SET (MD)
29 ACID, SHOT, FRACTURE,~MEN? SOU~EEZ~ ETC
PACKER SET (MD)
8362'
DEPTH INTERVAL (MD)
9915'
IAMOUNT AND KIND OF MATERIAL USED
121 cu. ft. Class G w/18% salt
and 1% friction reducer
DATE FIRST PRODUCTION 1PRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump)
I
DATE OF TEST HOURS TESTEDIICHOKE SIZEIITEsTPROD'NpERIoDFOR~ I OIL-BBL iGAS-MCF
I CALCULATED OIL--BBL GAS-MCF
FLOW TUBINGpR ESS CASING PRESSURE 1 24-HOUR RA~TEr I
31 DISPOSITION OF GAS (Sold, used for fuel, vented, etc )
I WELL STATUS (Procluclng or
shut-In)
WATER-BBL
I
GAS-OIL RATIO
iWATER-BBL lOlL GRAVITY-APl (CORR)
I TEST WITNESSED BY
32 LIST OF ATTACHMENTS
Well History, Well Logs, Directional Surveys, Core Data Sheet
A !
[% (_.,'[~%.~ ( ~/~,,~'"'1~. District Drilling Engineer
SIGNED ~ - " ~ ~ ~'"""""%'~ TITLE
MM:~a R.H. Reiley
*(See instructions and Spaces for Additional Data on Reverse Side)
DATE
INSTRUCTIONS
General Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of
lands and leases ~n Alaska
Item: 16: Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements g~ven ~n
other spaces on th~s form and ~n any attachments
Items 20, and 22' If th~s well is completed for separate production from more than one ~nterval zone (multiple com-
pletion), so state ~n ~tem 20, and ~n ~tem 22 show the producing ~nterval, or ~ntervals, top(s), bottom(s) and name(s)
(~f any) for only the ~nterval reported ~n ~tem 30 Submit a separate report (page) on th~s form, adequately~dent~hed,
for each additional ~nterval to be separately produced, showing the additional data pertinent to such ~nterval.
Item 26: "Sacks Cement" Attached supplemental records for th~swell should show the detmls of any multiple stage
cementing and the location of the cemenbng tool
Item 28. Submit a separate completion report on th~s form for each ~nterval to be separately produced (See ~nstruct~on
for ~tems 20 and 22 above)
34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS,
WATER AND MUD 35 GEOLOGIC MARKERS
NAME
MEAS. DEPTH TRUE VERT. DEPT
BKB Subsea
Sag R. SST. 8832' 8751'
Shublik 8855' 8775'
Ivishak 8937' 8856'
36 CORE DA~A', ATTACH BRIEF DESCRIPTIONS OF LITHoLoGY, POROSITY,'FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER
,,,
See attached sheet.
GR[AT LAND DIR[CTIONAL DRILLING INC.
STATE OF' ALASKA COPY
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
SOHIO
COMPANY
Y-3
WELL NAME
PAD Y NORTH SLOPE ALASKA
AL 7 80 D19
LOCATION
SINGLE SHOT 7/22/80
JOB NUMBER
TYPE SURVEY DATE
BOB P,RICE ~ANAGER
rl. Ar, l~- .... TITLE
2815 8890
'D'EPTH INTERVAL- '-~ FRoM~--
RFI dW
S I GNATURE
7/1/80
'DATES SURVEY WAS TAKEN
7/12/80
__
FROII TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY
OF YOUR WELL
We have retained a copy of your survey report in our files for your
convenience; however, should you so destre, all copies of the survey report
wdl be forwarded to you on written request. All surveys are kept tn a
locked file and are held ~n strictest confidence. Additional cop~es of your
survey report can be made from the original by any blueprint company
COMPLET ION REPORT
SOHIO ALASKA PETROLEUM
MAGN£T'~C - -S lblqG L-~ -S'140 T--S1;:;~V£Y --'
RADIUS OF CURVATURE METHOD OF COHPUTATION
COMPUTED FOR GLDD BY FM L INDSEY & ASSOC
01 JULY 80
WELL
lr, 'B F. LEV -80 ~00
RECORD OF SURVEY
..... ALC--CA1;.-CtR.-AT~Ot'iS PERFORMED BY I B I~ ELECTRONIC COMPUTER
TRUE
MEAS, DR!FT VERTICAL SUB
-DE'PTTI--*AI4GLE- ---DEPTH --'-SEA
D lq
DRIFT
DIREC
DEG,
TOTAL COORDINATES
C L O S U R E S
DISTANCE ANGLE
D N S
DOG LEG
SEVERZTY
DEG?IOOFT
DISTANCE
O,O0 S O O- O-W - 00OO0
000
ASSUMED VERTICAL TO 2776
2776 1 0 2715'~ 85 2695.85 N O.OOE
2815 I 30 ~2814.84 273~.8~ N~OeOOW 25.00 N 0.28
---2846-
2909 4
29~1
3122~0-~--'3119,~'---~0~.96 N28,~ -- 52.39
3278 15 0 3272e22 3192.22 N25.SOw 82.52
3435 20 0 3q21.90 3341.90 N22.50~ 125,63
4422 22 0 43~9,9~ 6259,95 N17.00~ 668,55 N 166,09
4887 22 0 4771,09 ~691,09 N15-50W 635.78 N 214,83 W 671.09 N 18 ~0 14 W
-5355
591~ 22 0 5723e30
6102 22 0 5897,61 5817.6X
6349 lg O-6128~95 60~8.95 NI~eOOW- 1160,11 N -~0~60 ~' 1211,93 N 16 ~8 56 W
6537 17 0 6307.7& 6227.7a N14eOOW 1216.k8 N
6753 13 0 6516,33
7~ ~0 0
7247 7 0 7002s61 6922,61 N 9$00~ 1354.57 N 396,02 W
7552 5 30 7305e78 7225.78 N 2.00E 1387e66 N ~98e05
-T887 3-30---~396~--~559~T~ .... N -TeOOE'~ ~413~-~ N ~-- 395~'~ ~ -- -1468 026 N 15 38 eT W
00036 23*32
1.284
2,~20
3*175 28,58
30125 31,16
3.207
3.193
0-4~7 .... 298032
0.071 496,01
0.121 670.19
00034 1054.82
0.100 112b-23
1021~ 1211-70
1.064 1269077
1.852 1~2~061
1,215 1411.20
0,493 1443.60
- SOH 10 WELt. ¥~-)
SINGLE SHOT SURVEY
01 JULY 80
.............. RECORD OF SURVEY ---
ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER
TRUE
-M£AS. DRIFT VERTIC'AI~
DEPTH ANGLE DEPTH
D M
-~B DRIFT
SEA DIREC
DEG.
TOTAL COORDINATES
8376 2 45 8128.00 8048.00 N27-DOW 1499.69 N
8890 1 45 8641.&0 8561e60 N27.OOW 1457.63 N
400.66 W
409,,, 90 W
SURVEY DONE WITH 9-5/8 CASING POINT AT 8948
BOTTON HOLE CLOSURE 1514.17 FEET AT N 15 42 23 W
CLOSURES
DISTANCE ANGLE
D M S
DOG LEG
S/VERITY
DEG/IOOFT
1514,17 N 15 42 23 W
0-154
0-195
SECTIO;¢
UISTA~,CL
1514,17
SOHIO WELL ¥~-]
SINGLE SHOT SURVEY*
INTERPOLATED TRUE VERTICAL DEPTHS, COORDINATES AND CLOSURES FOR GIVEN DEPTHS
TRUE
CODE MEASURED VERTICAL TOTAL COORDINATES C L 0 S U R E
*NAME DEPTH DEPTH - DISTANCE ANGLE
D H
01
JULY 80
SUB
SEA
-'~'OH'IO~WELL Y-~' ............ SINGLE SHOT SURVEY ---
MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH.
01 JULY 80
TRUE
MEASURED ..... YF=RI'I:'CAL SUB
DEPTH DEPTH SEA DIFFERENCE
VERTICAL
CORRECTION
TOTAL COORDINATES
180
28O
380'
/,80
580
68'0
780
880
980
1080
1180
1280
1380
1480
1580
1680
1780
180. 100 0 0 0.10 N
280* 200 0 0 0-2~+ N
380~ .... -300 - -0 0 ............. O.k5 N
480. z~O0 0 0 0.72 N
580, 500 0 0 1.05 N
~ .... 6'00 - - O ......... O 1 * 45 N
780- 700 0 0 1-91 N
880. 800 0 0 2'.43 N
9'8'O~~'~O- ........... 0 ........... 0 ............. 3,O1 N '-
1080. 1000 0 0 3.66 N
l!80s 1!O0 0 O 4.:~7 N
1380- 1300 0 0 ~-98 N
1480. 1400 0 0 6.88 N
1680. 1600 0 0 8.87 N
1780. 1700 0 0 9.96 N
0o00 ~
0.00 ~
O.00 W
0.00 W
O.00 W
0-00 ~
0.00 H
0.00 W
0-00-~
0.00 ~
OeO0 ~
--- 0~00 w
Oo00 ~
0.00 W
0.00 ~
0.00 ~
0.00 ~
- - - 18'80 ........... 1-8'80~,
1980
2080
2180
2280
2380
2480
2580
2680
2780
2880
2981
308 I
~18~
3286
3497
]60a
.... I800 0 -- 0 .....
1980. 1900 0 0
2080. 2000 0 0
2180~- -2100 .... 0 .............. 0
11,11 N .... Oo00 ~
12.32 N 0.00 H
13.60 N 0.00 W
1~'94 N - - -O.00 W
2280. 2200 0 0
2380. 2300 0 0
2a80. .... 2400 0
2580. 2500 0 0
2680. 2600 0 0
-2780.- 2700 0 -
2880. 2800 0 0
2980. 2900 0 0
3080.-' -~O00' I
3180. 3100 3 Z
3280. ~200 6
3380e - 3300
3480. 3400 16 6
3580, 3500 Z3 7
16.3/* N 0.00
17-80 N 0.00
...... 19.33 N -- O.O0
20.92 N 0.00
22*57 N OeO0
- ' 24,Z9 N 0.00
27,Z8 N 1.68
34.77 N 5.78
62.70 N 20.66
84.42 N 31.~8
- - 1-12.37 N ~3.74
145.66 N 57060
180.45 N 71.03
SOHIO WELL
SINGLE SHOT SURVEY
MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH.
01 JULY 80
MEASURED
- DEPTH
TRUE
VERTICAL SUB MD-TVD
---DEPTH SEA DIFFER[NCE
VERTICAL
CORRECTION
TOTAL COORDINATES
3711 3680~- -3600 30
3818 3780. 3700 38
3926 38800 3800 46
4034 ........... 3~0~ .... 3'900-** 54
4142
4249
........ 4357
4465
4573
468I ...........
4789
4897
4080, 4000 62
4180, 4100 69
~28U~ ...... 4200"- 77
4~800 4~00 85
44800 4400 93
· 580~ ..... 4500-- lOX --
4680m ~600 109
4780~ 4700 117
5004 ..... ~*~80, ..... ~80~' -124
5112 4980, 4900 132
5220 5080. 5000 140
5328 ....... ~180~ .... 5100---148'
5436
.5544
5652
5759
5867
5975
6083
6191
6297
6403
6508
6612
6716
6818
6920
7022
7123
7224 --
7325
52800 5200 156
53800 5300 164
..... 5a900 .... 5400 -172
, 55800 5500 179
5680. 5600 187
.... 5780. .... 5700' 1954
58800 5800
59800 5900
6080.--- 6000
61800 6100
6280, 6200
63800 6300
64800 6400
6580, 6500
6680. -' 6600
6780, 6700
68800 6800
-- 69 80 · .....6900
7080 · 7000
2O3
211
217
223
228
232
236
238
24O
243
244
245
7 ~' 216.42 N
8 253.36 N
8 291.29 h
8' ~ - 329.75 N
8 368.25 N
7 ~ 406.63 N
~45.27 N
483.96 N
522m73 N
........ 561-56 N
600047 N
639025 N
84.18
97.02
110.30
122.68
134.92
146096
158,95
170.78
182.32
193.54
204045
215076
7 ............ 67801~ N - 226008
8 717.28 N 236.31
8 756.47 N 246.37
8 ............... 7'95,69 N --2~6.28
834071N 266.80
87)o91N 276057
91~,11N 286.35
952015 N 296008
991041N 305087
1030.43 ~ -316.60
1069,57 N 326.81
1107,69 ~ 337023
1143.47 N 346,43
1176089 N 354.78
1208017 ~ 362,58
1237002 N 369,64
1262051N 375,43
1284079 N 380o~9
1304071N 385007
1322046 N 389,65
1338.09 N 393,11
1351074 N 395-59
136~07~ N 397025
SOHIO WELL-Y~-~J ....................
MEASURED DEPTH AND OTHER DATA FOR
SINGLE SHOT SURVEY
EVERY EVEN 100 FEET OF SUB SEA
DEPTH.
O! JULY 80
TRUE
MEASURED ....... VERT~AL-SUB MD-TVD
DEPTH DEPTH SEA DIFFERENCE
7426 7180. 7100 246
7526 7280. 7200 246
7627 '- 'ir'580~ ....7300 ..... 247
7727 7480. 7400 247
7827 7580. 7500 247
7927
8028 7780. 7700 248
8128 7880. 7800 248
8Z'Z8 .........
8~28 8080. 8000 248
8428 8180, 8100 248
8528' 82eSOT----8~---248
8628 8~80. 8300 248
8728 8480. 8400 248
8828
VERTICAL--
CORRECTION
TOTAL CC)ORDINATES
0 1402.81
0 1410.0t
1 1121.98
0 1~27;22
0 14~1.87
0 -144~84
0 [449.50
0 1452.86
398,08 W
398.14 W
397.74 W
397.17 W
396.46 W
395,63 W
394,28 W
392.31 w
~86,8~ ~
i0t,77 W
40~ ~79 W
~05,66 W
~07.~7 ~
4~ ,9~ W
-'50141:0 WELL
SINGLE SHOT SURVEY
01 jljl..Y 80
'TRT'ERPOLATE'D VALU£S FOR-~V£N-IO0-O FEET OF MEASURED
TRUE
..... MEASURED ...... VERTICAL SUB
DEPTH DEPTH SEA TOTAL COORDINATES
lottO- 999'~--- ' 9-I 9 · 3 · 14 N .... 0,00 I~
2000 1999, 1919o 12°57 N 0,00 W
3000 2999, 2919° 36°7~. N 6.8~ W
~000 ~~ .... ~B6~, .... 317.70 ~ '- 118.82 W
5000 487~. 4795. 676.69 N 225,70 W
6000 ~80~, ~7~3. 1039,50 N ~8e93 W
8000 T752- 7672- la20*qb N ~9q.71 ~
HORIZONTAL VIEW
SOHIO ALASKA PETROLEUM
WELL Y- $
RADIUS OF CURVATURE
MAGNETIC SINGLE- SHOT
SCALE= I# = I000"
dULY 2;1~ 1980
ALL DEPTHS SHOWN
ARE TVD
400*'
1600
2000-
~800.
3200
VERTICAL SECTION
SOHIO ALASKA PETROLEUM
WE LL Y- $
RADIUS OF CURVATURE
MAGNETIC SINGLE - SHOT
SCALEs I' = I000~
JULY 21, 1980
ALL DEPTHS SHOWN
ARE TVD
480C
6400
T V D = 8642'
TMD= 8890'
p rr -sun
d A. Fouch~
President
August 26~ 1980
Mr. Gary Plisga
Sohio Alaska Petroleum Company
3111C. Street
Anchorage, Alaska 99503
Rel Our Boss Gyroscopic Survey
Job No, Boss~16646
Well Y~3 (SEC34 Tll R13)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey~ August 22, 1980
Operator~ Kirk Afflerbach
Dear Mr~ Plisga~
Please find enclosed the "Original" and sixteen (16) copies
of our Boss Gyroscopic Directional Survey on the above well.
Thank you for giving us this opportunity to be of service,
I
Yours very truly,
SPERRY.SUN, INC,
Ken Broussard
District Hanager
KB/kc
Enclosures
LSOHIO ALASKA PETROLEUM
PRUDHOE BAY
ALASKA
--
SPERRY-S~N--WELL SURVEYING COMPANY
ANCHORAGE9 ALASKA
COMPANY
............... COMPUTATION DATE
AUGUST 25, 1980
PAGE I
2.2, 1S80
DATE OF SURVEY AUGUST
B 0 SS ' G Y'~-O .~'C"O P ! C "SUR VE Y
JOB NUMBER BOSS-16646
KELLY BUSHING ELEV. = 80.62 FT.
OPERA'~'OR-K IRK AFFLERBACH
TRUE
-HP._. A SURE D VE R ~"i ~"i'-L--
DEPTH DEPTH
SUB-SEA COURSE COURSE
VERTICAL i-NCLINATiON DIRECTION
DEPTH DEG MIN DEGREES
DOG-LEG TOTAL
'~E-V ER I-Y ¥ .... R ~'C'T' A'N 6 LFL"-~ R .... COiO,R D iN:~,¥E s ..... VERTICAL .....
DEG/iO0 NORTH/SOUTH EAST/WEST SECTION
0 0.00 -A0.62
loo loo.oo ~9.~
200 199.99._
300 299.99 219.37
~oo 399.98 319.36
500 A99.98 419.36
60'~ ...... §99.e7 5~9¥35
700 ~89.97 619.35
800 799.96 719.34
900 8'~9.96 ,819.3~
1000
1100 1
0 0 N O. 0
0 28 S 39. 0
0 36 S 26.80
0 36 S 36.i0
0',00 0.00 0'00 0~'o0
,AB .3~ S .26 E -.~9
· 17 1.12 S .76 E -1.29
........... "10 2.'02 ..... ~ i",3'1 E -2-~30 ....
· 32 3.00 s 1.69 E -3.35
· 05 4.14 S 1.8A E -4.49
· 09 ~,~7'S 1.96'E -5,60
· 46 6.03 S 2.24 E -6.41
.15 6.38 S 2.87 E -6.92
.13 %T'gT--s S";"~'8"E -7,'37~--
.25 6.87 S 4.17 E -7.75
· 21 7.13 S 5.08 E -8.25
· 37 7.8~- ~ 5.87 E -9'~15
· 28 9.05 S 6.57 E -10.51
· 23 10.66 S 7.26 E -12.25
.09 1'21'~'0-S ?'.~i''E -14"0-g
· 30 13.89 S 8.~2 E -15.67
· 49 14.83 S 8.56 E -16.6J,.,~
· 05 '1'~,'38 S 8.45 E -17.1' ~
.07 15.97 S 8.34 E -17.65
· 14 16.59 S 8.39 E -18.26
· 2~ 1'7.-'2~' ~ ~-'"37"E -18~9'i
· 17 18.15 S 8.26 E -19.72
· 23 18.95 S 8.16 E -20.46
'I'.13 19.~6-'S 8.8'8 L -21;U5
1.13 19.53 S 9.58 E -21.41
· 03 19.72 S 9,32 E -21.52
.17 19,78'u'$ 9;'02 .... E -21,5 U .......
· AR 19.41 S 8.36 E -20.96
3.79 18.32 S 7.57 E -19.69
2'80 I5,9~- S 6'1~' 'E -17.Ol
0 38 S 6,39 E
0 40 S 8.89 E
0 37 S 2.50 E
0 23 S 50.39 E
0 26 S 69.59 E
0 20 S 58.30 E
1200 1
1300 1
1400 1
1500 1
999.96 919.3~
099.95 1019.33
19~.95-- 1119.33
299.94 1219.32
399.92 1319.30
1600 1599,89 1519e27
1700 1699,89 1619,27
1800 1799,88 1719,26
1900 1899,88 1819,26
2000 1999,88 lq19,26
2200 2199.87 2119.25
2300 2299.87 2219.25
2400 ....... ~399.86 23f~.24
0 30 S 84.39 E
0 36 S 65.39 E
d'--3 9 s 3 jJ'~g-' E
0 56 S 28.80 E
1 4 S 18.30 E
i 2 S 22.80 E
0 46 S 13.A0 E
0 19 ~ 5,69 W
0 19 S 15,39 W
0 22 S ~.50 W
0 21 S 15,60 E
o 2 7 ~-i~S~g'"~
0 53 S 0.80 E
0 25 S 19.50 W
2500 2499.85 2419.23
2600 2599.85 2519.23
2700 2699.85 2619.23
2800 2799,85 2719.25
2850 2849,82 2769.20
2899,74 2~19-ii~
0 11 S 59, 0
0 10 S 50.10
o 12
0 40 ~: 55.79
2 28 N 30.50
3- 52 -'N-~'~,'29
SO}ti,O_ ALASKA PETROLEUM
Y-3 (SEC 34 Tll R13)
PRUDHOE BAY
ALASKA
TRUE
MEASUREP VERTICAL
DEPTH DEPTH
COMPANY
....... ~F~N~Y-suN '-W-~LL SUkvEYING COMPANY
ANCHORAGE,~ ALASKA
, AGE
DATE OF SURVEY AUGUST 22.,. 19.8.0
COMPUTATION DATE ~OSS GYROSCOPIC SURVEY
AUGUST 25, 1980 dOB NUMBER BOS8-16646
KELLY BUSHING ELEV. = P0.62 FT.
OPERATOR-KIRK AFFLERBACH
SUB-SEA C
VERTICAL INCLI
DEPTH DEC
OURSE COURSE DOG-LEG TOTAL
NATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL
MIN DEGREES DEC/lDO NORTH/SOUTH EAST/WEST SECTION
3000 2999.29
3100 3098,26
3200 3196.50
........ ....... i. 6 o
3400 3389,23
3500 3483.30
2918,67 6
3n17,64 9
3115,88 12
3212,98 15
3308.61 18
3402.68 21
55 N 35.10 W 3.07 8.11 S .91E -8.05
21 N 30.20 W 2.52 3.85 N 6.64 W 5.52
6 N 27,79 W 2,79 20,14 N 15,62 W 23,66_
30 N 23,70 W 3,54 A1,66 N 25,88 W 47,16
27 N 22,39 W 2.98 68.53 N 37,29 W 76,14
10 N 20,60 W 2.79 100.09 N 49.68 W 109,89
3600 3576.44
3700 3669.42
3800 3762.38
3900 3855.22
4000 3947.98
4100 4040.75
4200 4133.53
4300 4226.32
440~ A319.10
4500 4411,83
5495.82 21
3588.80 21
3681.76 -21
3774.60 21
3867.36 21
3960.13 21
4052.91 21
4145,70 21
4238,48 21
4331.21 21
31 N 20.70 W .34 134.15 N 62.52 W 146.17
39 N 20.20 W .23 168.63 N 75.37 W 182.85
37 N 19.89 ~' ,..!.2 ....... 203,27 N ...... 88.,._0.2....W. 219.,~_~
59 N 19,79 W ,37 238,21 N 100,63 W 256,70
53 N 19.39 W ,18 273,41 N 113.16 W 293.98
55 N 16.79 W .97 308.87 N 124.75 W 331,26__
54 N lg,70 W ,71 344.42 N 136.15 W 368,57
51 N 18,60 W ,06 379,74 N 148,05 W 405,80
57 N 18,29 W ,15 415,13 N 159,86 W 443,08
58 N 17.79 W .19 450,70 N 171.45 W 480,47
4600
4700
4HO0
4900
...... ?oo
5100
5200
5300
4504.56
4597.29
4690,00
4782,67
4875,46
5400
5500
5600
5700
5800
5~1'0
TF'o o
4423.94 22
4516.67 21
q609.38 22
4702.05 22
4794,84 21
4968,32 4~87,70 21
5061.18 49R0,56 21
5154.13 5073.51 21
5247.i3~~166.~1--
5340,18 5259,56
5433,27 5352.65
5526,43 5445,H1
561 9,50 5538,8.8
5712,51 5631,89
21
21
21
21
21
21
21
0 N 18. 0 W ,08 486.34 N 182.96 W 517.90
55 N 17.60 W ,17 521.96 N 194,40 W 555,2°
6 N 1~',39 N ,19 557,71 N 205,67 W '592,'~-~''~--
2 N 17,39 W ,05 593,58 N 216,91W 630,33
43 N 17.60 W .34 629,13 N 228,12 W 667,59
52 N 17.29 W ,19 664.55 N 239.25 W 704.71
40 N 17.20 W .20 699.97 N 250,25 W 741.79
38 N 16,70 W ,19 735.26 N 261,01W 778,6~
N 16,79 W ,17 770.~ N
N 16.60 W ,09 805.54 N
N ~,20 ..... U ................ ~.2.5 ........... 8.~.0...57.~N
N 16.79 W .22 875.42 N
N 16.39 W .35 910.48 N
N 17. 0 W ,26 9~5,66 N
28
31
19
17
37
28
N 16.70 W .32 980.94 N
271.60 W 815.42
282.13 W 852.06
................ 292.44 W 888.58
302.76 W 924,92
313,21 W 961.50
323,76 W 99R,23
334,45 W 1035.08
, Y-3 (SEC
PRUDHOE BAY
ALASKA
PETROLFUM COMPANY
Tll R13)
TRUE
M~-ASURED -"V~'~TICAL
DEPTH DEPTH
SPERRY-SUN WELL SURVEYING
ANCHORAGE, ALASKA
COMPUTATION DATE
AUGUST 25, 1980
COMPANY
DATE OF SURVEY AUGUST
DOSS GYRO$'cOPi C ' SuRVE'Y
,.lOB NUMBER BOSS-166A6
KELLY BUSHING ELEV.
OPERATO
22, 1980
80.62 FT.
'R"'K'I R K AFFLERBACH
SUB-SEA COURSE
VERTICAL INCLINATION
DEPTH DEG MIN
COURSE DOG-LEG TO
DIRECTION SEV'ERi'TY" 'REC'T'~NG'ULA'R
DEGREES DEG/IO0 NORTH/SOUTH
TAL
..... COORbiNATES v
EAST/WEST
ERT'i~-'/~
SECTION
6100 5898,33
6200 5991.34
6500 6084.98
6400 6179.37
6500 6274.36
6600 6370.03
5817.71 21
5910.72 21
6004.36 19
6098.75 18
6193.74 17
6289.41 16
46 N 16.50
20 N 17.10
42 N 17.29
51 N 17.60
34 N 17. 0
15 N 16.29
6700 6466.59 6385.97
6~00 6564.02 6483.40
6900 6661,99 6581,37
7000 6760.39 6679.77
7100 6859.11 6778.49
7200 6958.08 6877.46
........ YS~'o ...... i057.30 6976.68
7400 7156.67 7076.05
7500 7256.10 7175.48
7600 7355.67 7275.05
7700 7455.37 7574.75
7800 7555.13 7474.51
· 07 10i'6.49 N 3q5.05 W
· qB 1051.66 N 355,66 W
1.63 1085.15 N 366.03 W
· 8~ ..... i~i'i'6'."6~'"N ........ 37'5",'9'3"'W
1.29 1146.48 N 385.23 W
1.34 1174.35 N 393.56 W
1072.Z~
1108.91
1143.96
1176'97
1208.21
1257.29
13 45 N 15.29
1P 16 N 13.20
i0 49 N 14,20
9 41 N 14.29
~ 57 N 11,20
7 45 N 11.79
~ ~ ...... ~ 7.7 o
6 19 N 2.50
5 5~ N 0,50
~ .... 4i ........ ~ 3.20
4 16 N 9.39
5 37 N 8.10
8000 7754.75 767~.13 3 27
...... _~! o o ........ !~8 D_,9_~ ~7 7 7 3.9 6 .~ 13
8200 7954.42 787~.80 .... 3' 13
N 6. 0 E
N 7. 9 E
N 7.80 F
~i-1-2",";~ ~ ..... r
2.51 1199.24 N
1.55 1221.05 N
1.46 1240,49 N
400.63
406.19
410,92
1.12 1257.75 N 415
1.19 1273.27 N A18
.87 1287.22 N 421
.30
.67
1.30 1299.47 N
A25.82 W
· 63 1310.62 N
· 48 1321.25 N
1.25 1330.46 N
.64 1538.22 N
· 65 1545.03 N
· 2'i " ' 13 ~"f/. TT--N
· 07 1357.17 N
· 2~ 1562.96 N
. 2'6 ........ Z-~%~0' N
424.82
425.11
424."92
424.09
423.03
422.27
421.58
~20.82
8~00 8054.28 7973.66
8~00 8154.17 8073.55
8600 8353.98 8273.36
_.~.~.~ ~~.~74 8373.32
8800 8553.91 8473.29
9000 8753.83 8675.21
--916d----§~5~.75 8773.13
2 46 N 8.69 E
2 45 N 6.69 E
2 37 ..... l~'~-'d-.-8"'O ' E
1 52 N 13,89 E
1 19 N 15.39 E
i 25 N 6 · 5'9 .... E
1 28 N 3.50 W
2 0 N 4. 0 W
2 2'7---~,~ ....0'.60' ~,'
.49 1573e65 N
· 10 1378.43 N
· 23 ...... 1383,0'7 N
,77 1386,90 N
· 5~ 1~89.61 N
,23 ..........139i';"9'7 .... N
· 26 1394.49 N
· 53 1397.51 N
· 47 1401.38 N
418.87 W
418.22 U
q17.51 W
416.69 W
415.99 W
4'15.5'4 .... ~/
415,~7 W
415.67 W
4t5.81 W
1263.16
1285.66
1305.66
1323.46
1339,35
1353.54
1365.91
1376.91
1387.21
1396.'o~
1403.24
1~ 09 · 5 ~,~_~
1415.~
1~20.78
1426.1~
1~35.87
1~0.2~
lq48.02
1~50.42
1~54.97
1~57.93
.................... ~F~R~Y'-~UN WELL SUF-EYING COMPANY
ANCHORAGE9 ALASKA
Y-$ (SEC 3A Tll R13) COMPUT/~TION DATE
PRUDHOE BAY AUGUST 25, i980
ALASKA
AGE.
DATE OF SURVEY AUGUST 22, 19AO
BOSS GYROSCOPIC SURVEY
dOB NUMPFR BOSS-16646
KELLY BUSHING ELEV. =
~0 · 62 FT ·
OPERATOR-KIRK AFFLERBACH
............................ 7_RUE SUB-SEA C OU.~R_S E .... C_OU_R S E DOG-LEG TOTAL
MEASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES
DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/iO0 NORTH/SOUTH EAST/WEST
VERTICAL
SECTION
9~6---' 8953,67 8873,05 2 ~- N 5, O E ,25 1405,57 N 415,66 W
9300 9053,58 8972,96 2 21 N 10,89 E ,24 1409.65 N 415,09 W
9400 9153,49 9072,87 2_. ~ N 16,20 E ,2~ 1413.73 N 414.10 W
9500 9253,~0 9172,78 2 22 N 9.50 E ,30 1~17.83 N 413.16 W
9600 9353.31 9272,69 2 3A N 11,19 E .22 1~22.08 N ~12,38 W
~oo ~5~.~o ~.~ ~ ~ N ~.~o ~ .~o ~2~.~ N ~.~ .w
........ MOR~IZON~AL_DJ.~B.LA~E~.N_T_..~ 1494,~Q~. FE~T~.AT N_O_R~H.,..15..DEG, ...... 57..M.IN~__~E~.T..ATMD .... : ....... 9.91
1A65.6~
1473,10 '~
1A76.78
1~80.65
1A94,40
THE CALCULATION PROCEbURES ARE RASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD,
i_SOH~.0 ALASKA
Y-$ (SEC 34
PRUDHOE BAY
ALASKA
PETROLEUM COMPANY
Tll R13>
SDERPY-SUN WELL SURVEYING COMPANY
ANCHORAGE~ ALASKA
COHPUTATION DATE
AUGUST 25, 1980
, AGE 5
DATE OF SURVEY AUGUST 22, 1980
FT.
JOB NUMBER BOSS-16646
KELLY HUSHING ELEV, : 80,62
OPERATOR'K1RK AFFLERBACH
INTERPOLATED VALUES FOR EVEN 1000 F~ET OF MEASURED DEPTH
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL
DEPTH ........... D~D~'H DEPTH
0 0.00 -80.62
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH 'E A ST/-~IE ST" 'DIFFERENCE CORRECTION
0.00 0.00 0.00
1000 999.96 919.34
2000 1999.88 1919.26
3000 2q99.29 2q18.67
AO00 3947,98 3867.36
5000 4875.46 4794.84
6000 5805.47 5724.85
6.87 S a.17 E' .OA .04
16.59 S 8.39 E .12 .08
R.11 S .91 E .71 .59
273,41 N 113,16 W 52,02 51.31
629,13 N 22R,12 W 126,54. 72,51
980,94 M 334,45 W 194,53 70,00
7000 6760.39 6679.77
~qO00 7754.75 7674.1;5
9000 8753.8;5 8673.21
-~-5 9667.96 958~f;S4
1257,75 N 415.30 W 239.61 45.08
1357,17 N 421.58 W 245.25 5.63
1397.51 N 415.67 W 246.17 .92
1436,85 N 410.74 W 247,04 .87
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE
DIMENSION&L
RADIUS OF CURVATURE METHOD,
Y-3 (sEc 34 Tll R13J
PRUDHOE BAY
ALASKA
COMPANY
SPERRY-SUN WELL SURVEYING
ANCHORAGE, ALASKA
COMPUTATION DATE
AUGUST 25, 1980
COMPANY
DATE OF SURVEY AUGUST 22,
JOB NUMBER BOSS-16646
KELLY BUSHING ELEV,
OPERATOR-KIRK
PAGE 6
·
1980
: 80.62 FT,
AFFLERBACH
INTERPOLAT
ED VALUES FOR EVEN 100 FEET OF
SUB-SEA DEPTH
TRUE
MEASURED VERTICAL
I"'~ ~ ~ ......... b EP~'~ '
o ........ 0~00
80 80.62
180 180.62
280 2~0,62
3~0 380,62
880 480,62
580 580.62
680 680.62
780 780.62
880 R80,62
980 980,62
1080 1080.62
SUB-SEA
VERTICAL
DEPTH
-80,62
TOTAL
RECTANGULAR COORDINATES
MD-TVD VERTICAL
NORTH/SOUTH
EAST/WEST DIFFERENCE CORRECTION
0.00 0.00 0.00
1180 1180.62
1280 1280.62
1380 1380.62
1480 1480.62
1580 1580,62
1680 1680,62
1780 1780.62
0.00 .20 S
100.00 .94 S
200.00 1.85 S
300,00 2,79 S
400.00 3.92 S
500.00 5.06 S
600.00 5.94 S
'700,00 6.33 S
800,00 6,61 S
900.00 6.85 S
lO00.OO 7.04 S
1100.00
1200.00
1300.00
1400.00
7.65 S
8,~7 S
10.32 S
12.07 S
13.6~ S
14.72 S
15.27 S
1500,00
1600.00
1700.00
· 16 E .00 .00
· 67 E .01 .00
).19 E .01 .01
1.66 E .O2 .01
1.81 E .02 ,01
1.95 K .03 .01
2.14 E .03 .00
2.73 E .04 .00
3.38 E .0~ .00
~.00 E .Oq .00
4.90 E .05 .00
5.75 E .05 , .01
6.42 E .06 .01
7.14 E .08 .01
7.77 E .09 .02
8-36 E .11 ,01
8.57 E .11 .01
8.48 E .12 .00
SOHIO ALASKA
Y-3 ( SEC 34
PRUDHOE BAY
ALASKA
SPERRY-SUN'~ELL SURVEYING
ANCHORAGE9 ALASKA
PETROLEUH COMPANY
YIi Ri3) ....... COMPOTAT-~'ON DATE
AUGUST 259 1980
INTERPOLATED VALUES FOR FVEN 100 FEET OF
COMPANY
, AGE
DATE OF SURVEY AUGUST 22, 1980
7
dOB NUMBER BOSS-16646
KELLY BUSHING ELEV. : 80.62
.... OFER'ATOR"KI'RK AFFLERBACH
FT.
SUB-SEA DEPTH
MEASURED
OEPTH
TRUE SUB-SEA TOTAL
VERTICAL VERTICAL REC TANGLIL4R COORDINATES MD-TVD
DEPTH DEPTH NORTH/SOUTH EA~T?-WE$T' 'OIFFERENC'E '
VERTICAL
CO-9~'RECTION
1880 1880.62 1800.00
l~W6 ...... f'~L62 19oo.o0
2080 2080.62 2000.00
2~Ho ;~0.62 2100.00
23R0 2580.62 2300.00
2480
2580
2680
2780
2q80,62 2400.00
2.580 .~S
2680,62 2600.00
2780,62 2700.00
~'~8~ .... ~RO-.G2 ..... 2~00,00
2981 2980.62 2900,00
3082 3080.62 $000,00
~ 1A~----'~5~80 ~62 ...... 31d0.00
3286 5280.62 3200.00
3390 3380.62 3300.00
3~¢7 ....... 3~80-;6'2--3400'!00
~o~ 3580.62 ~5oo oo
......... ~_2 ...... ~p~ ..... ~6oo oo
15.85
16.a8
17.13
17.96
18.82 S
19.32 S
19.50 S
..... 19-,68~S
19.79 S
la.54 S
17,05 S
9.89 S
1,34 N
...... i7-. 2 i-"N
38.44 N
65.92 N
99,13 N
135.70 N
172,81 N
S 8.36 E .12 ,00
s 8.36 E . i2 .00
S 8.41 E .12 '.00
S R.26 E .13 .00
8.20 E .13 .00
8,56 E .lq ,01
9,6A E .15
9.37 E .15
9.09 E .15
8.55 E .15
~i'-'E ,21
2.15
5.18
2~.45
56.21
49,32
63,10
76.91
,01
.00
.59
1.50
................. 3,'i'~ .........
5.93
10.31
16.51
23.87
31.~3
· .00
.00
,06
.37
.92
i"6'5
2.77
4,39
6.1'9
7,37
7.55
SP'~RR;FLS~UN WELL SU,, CEYING
ANCHORAGE~ ALASKA
I SOHIO ALASKA PETROLEUM COMPANY
Y-& (SEC 54 lll ~'15) ............................ COMPUY'ATION DATE
PNLIDHOE t'AY AUGUST 25~ 1980
ALASKA
.......... I_N_LE.R.R. OLAj_[D V~LUES FOR g~.EN 100 FEET
COPPANY
DATE OF SURVEY AUGUST
dOB NUMBER BOSS-16646
KELLY PUSHING ELEV.
PAGE
22,__.1.g__8_~0 .....
= 80,62 FT,
OPERATOR-KIRK AFFLERBACH
OF SUB~S.,E,.A,,.,O..EPTH
TRUE SUB-SEA TO
MEASURED VERTICAL __VERTICAL REC_T.A_N_G_U_.L~?
IDEPTH ..............-O ~.-~-T'~-' DEPTH NORTH/SOUTH
....... 3819 ..... $..7R0.,.62 3700%00 210,07 N
3927 3RR0.62 3800.00 247.86 N
TAL
COOR
DINATES MD-TVD
EAST/WEST DIFFERENCE
VERTICAL
90,48 W - 3q.01
IOA.IO W 46.77
CORRECTION
7,77
4O35 3980.
~lq2 4080.
4250 4180.
4558 ~280.
__ 4466 .... 4380,
4574 q480,
4£,B2 4580.62
4789 ~6B0.62
...... ~-89'~ ........47P0.62--
5005 4880,62
.5 13 8o.62
5220 ......... 50~0.62
5~28 5180,62
5280,62
5580,62
5480,62
5758 5580,62
62 3900.00
62 4100.00
62 4200,00
62
5435
5543
5650
~500.0
~600.0
4700.0
~800.0
~00.0
5000,0
5100.0
5200.0
5300.0
5400,0
5500,0
0
0
0
0
0
0
0
0
0
0
0
285.78 N 117,52
.... X 29.4 1
5~.56 7.79
62.35 7.80
362.36 N 142.20
400.41N 15A.99
438.71 N 167.60
477.14 N 179.97
515.57 N 192.37
554.08 N 204.53
W 70.1~ 7.78
W 77.89 7.76
W ............. 8.5.,.Z2 ........................... 7~82 ........................
w 93,56 7.84
W iOi.~l 7.8~
W 109.25 7.85
592.78 N 214.66
631.08 N 22R.74
669.26 N 240.72
707,34 N 252.53
745.33 N 26~.03
783.05 N '275.~0
~20.82 N 286.68
858,31 N 297,61
R95,70 N 308.86
w 117.17 7.91
W 124.93 7.76
W 132.64 7.71 .................... . .......
W 1~0.29 7.66
W 1~7.88 7.59
W 155.36 7.q8
W 162,85 7,49
W ]70.21 7,36
W 177,5~ 7,35
SOHIO ALASKA PETROLEUH
Y-3 (SEC- 34'-71! R13)
PRUDHOE BAY
ALASKA
............ ~FE~RY-SUN WELL SURVEYING
ANCHORAGE, ALASKA
COMPANY
.................. ~OMDUTATION DATE
AUGUST 25, 1980
COMPANY
DATE OF SURVEY AUGUST 22, 1980
JOB NUMBER BOSS-16646
KELLY PUSHING ELEV. : 80.62 FT.
ODEI~}F~O'R'-KIRK AFFLERBACH
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE
MEASURED VERTICAL
[DLPTH .....
..... bs65 568
'69'73-- 578
6080 588
6188 598
6295 608
6401 618
6506 62B
6611 638
6714 6A8
6816 658
7O20 678
7323 708
7424 7180.62
........ ~ ...... 7285.92
7625 7380.62
SUB-SEA TOTAL
VERTICAL RECTANGULAR COO
~' '~:'t5:1'~- .... ~(~R T~[/-~OUTH E
RDINATFS MD-TVD VERTICAL
A S T T~~'b-~iC'F E R E N C'~ " CORRECT I'ON
0,62 5600.00 933.66 N 520.10
0;g2 ........ ~'0'0~ .............
0.62 5800,00 1009.71 N 343.04
0.62 5900,00 1047.66 N 35~.43
0.62 6100.00 1117.06 N 376.06
0.~2 6Poo.oo 114~.~8 N 385.~1
0~'~2 ........ 63'60.00 fi~7~3f"N 394.~3
0.62 6400.00 1202.55 N 401.55
0.62 6500.00 1224.56 N A07.01
~;-62' 6600.00
0.62 6700.00 1261.11 N 416.16
7725 7480,62 7400.00
185.11 7.55
1~ 2 · 62 7 '; 5 '1
200.31 7.69
207.87 7.57
214.7~ 6.88
220.70' 5.95
225.95 5,25
230.42 4.46
233.82 3.40
236.37 2.55
2'38~35 1'.98
239.91 1,56
0.62 6800.00 1276.47 N ~19.47 u
0.62 ........ 69od.'0o 129O.~'~-'N 422.~o w
0.62 7000.00 1302.13 N 424.18 W
7100.00 1313.27 N 424.94 W
7200.60 ......... -'~23.7~, 425.13 W
7300.00 1332.51 N 424.R1 W
13~0.08 N 423.78 W
241.14 1.23
2~-Z;~i"~ .98
242.85 .73
243.48 .62
244,0'3
244.41 .39
244.71 .29
[SOHIO ALASKA PETROLEUM COMPANY
Y-3 (SEC 34 Tll R13)
PRUDHOE BAY
ALASKA
~PFR'~Y-SUN-'-W~LL SU~,¢EYING--
ANCHORAGE, ALASKA
C 0 ~4 FO¥~':rYo N DATF.
AUGUST 259 1980
COMPANY
DATE OF SURVEY AUGUST
JOB NUMBER BOSS-166A6
KELLY B.U_S..~IN_NLF~LV._,
r'AGE 1 O
·
22 9 198__0_ ......
........................ I NTERPOLAffED
VALUES FOR EVEN 100
OPERATOR-KIRK
FEET OF SUB-SEA DEPTH
= 80.62 F,T, ........
AFFLERBACH
MEASURED VE
!-DEPTH .............. D
........ 79.~ 5 ...... 7 5 8 o.
7925 7680.
8025 7780.
8126 7880,
.......... g2~ ..... ~8o.
8326 8080,
_ 8.92~ 818o.
8526 8280.
8626 8380.
8726 8480,
8826 8580,
8926 8680.
9026 8780,
9126 8880.
9226 89P0,
9327 90AO,
I........ -~ 42-7 .... 9180,
q'527 °280,
TRUE SUB-SEA TO
R T I.C _A.L .... V_E R! I_¢._A_~L___R_E.E_T. A_N_,G_ULA R
EDTH DEPTH NORTH/SOUTH
TAL
COORDINATES
EAST/WEST
62 7500,00 1Z46,63 N
A22,80 W
62 7600.00 1352.72 N
62 7700.00 1358.73 N
62 7800.00 k36k.J2 N
62 7900,00 1369,95 N
62 8000.00 1s7A.~2 N
62 81~,~ 1379.69 N
F2 8200.00 1584.27 N
62 8300,00 1387,75 DJ
62 8400,00 1390,20 N
62 8500.00 1392,63 N
62 8600,00 1395,17 N
62 8700.00 1398,4~ N
62 8~00.00 1~02,53 N
62 8900.00 1A06.68 N
62 9000,00 1410,7A N
62 9]00,00 1~14,85 N
62 9200,00 1418,94 N
62 9300,00 1423.28 N
422.11
421.39
~.2~..6~.___W
~19.52
~18.67
~07
417.28
~16.48
415.82
415.~6
415,51
415.7~
A15.83
415.56
~,1..~.o88
413.78
~12.1~
MD,.TVp .
DIFFERENCE
VER T! C___A.L
CORRECTION
244,93 .22
245.11 .19
245.30 .18
. .8_4.5.~6 ..16 .
2~5.62 ,16
245.75 .13
2.~5.86 ....................... ~.1.2
245.97 .11
2~6.06 .07
2~6.07 .03
2q6,10
246,13 .03
246.19 .05
2~6.27 ,08
2~6.~6 .09
2~6.~ .08
246,5~ ,09
246.62 .09
246.72 ,10
.~SOltIO A LA.S K A
Y-3 (SEC S4
PRUDHOE DAY
ALASKA
SPERRY-SUN '~ELL SUR.£YING
ANCHORAGEe ALASKA
PETROLEUM COMPANY
Tll R1-3) ............ COMPUTATION ~A'TE
AUGUST 25,~ 1980
INTERPOLATED VALUES FOR EVEN 100 FEET OF
· ,
COMPANY
AGE 11
DATE OF SURVEY AUGUST 22~ 1980
JOB NUMBER BOSS-166A6
KELLY BUSHING ELEV. : F~0.62
OPERATOR'~KIRK AFFLERBACH
FT.
SUB-SEA DEPTH
MEASURED
DEPTH
TRUE SUB-SEA TOTAL
VERTICAL VERTICAL RECTANGULAR COORDINATES
DEPTH DEPTH NORTH/SOUTH EAST/WEST
9727 9480°62
9827 9580.62
9915 9667,96
MD-TVD
DIFFERENCE
VERTICAL
C O-~-P" _FO T ~ 0 N
9400.00 1A27,96 N 411.59 W 246.83
9500.00 1A32.70 N 411.13 W 246.94
9587.3A 1436.85 N ~+10.7~+ W 247.04
.11
THE CALCULATION PROCEDURES
THE NEAREST 20 FOOT MD
USE A LINEAR INfER-DOLATION BETWEEN
(FROM RADIUS OF CURVATURE) POINTS
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
ii _1
SOHIO--BP ALASKA PRODUCTION DIVISION
3111 'C" STREI ~----" 'L'.',:, '
ANCHORAGE, AL~
TELEPHONE (907)21 ~1-~_:-~ .........
MAI L: POUCH 6-(~ ~ ................
ANCHORAGE, ALASKA 99502
REFERENCE:
OPEN HOLE FINAL DATA
,
//J~he following material is being submitted herewith. Please acknowledge receipt by signing a
V copy of this lette¢ and returning it to this office:-
;FO/UNIT/STATE :
Y-3 RFT 7/3.1/80
Y-3 FDC/CNL 7/12/80 & 7/29/80 ~/l&2 2" & 5"
Y-3 FDC 7/12/80 & 7/29/80 ~/l&2 2" & 5"
Y-3 BHCS 7/12/80 & 7/29/80 ~/l&2 2" & 5"
Y-3 DIL/SFL 7/12/80 & 7/29/80
Core Data Summary Sheet
Magnetic Single Shot Survey
Gyroscopic Su=vey
7/l-Z2/80
8/22/80
...
Well Records
SOHIO ALASKA PETROLEUM COMPANY
August 4, 1980
Alaska Oil & Gas Conservation Cc~mission
3001 Porcupine Drive
Anchorage, Alaska 99501
r
3111 "C" STREET __.__J_ ,,,ES E-lNG
ANC,ORAGE, ALASKA
TELEPHONE (907)265-00(
MAIL. POUCH 6-612 ,
ANCHORAGE, ALASKA 99! 0~; -. '~'
CONFIDENTIAL
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-3 (14-27-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report
of Drilling and Workover Operations, for the above-named
well for the month of July, 1980.
Yours very truly,
SOHIO ALASKA PETROLEL~4 CCMPANY
RHR: ta
Enclosure~
cc: Well File #17
R. H. Reiley
District Drilling Engineer
Form No. 10-404 f SUBMIT IN DUPLICATE
REV 3-1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
$. APl NUMERICAL CODE
50-029-20411
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28287
WELL WELL OTHER
2. NAME OF OPERATOR
Sohio Alaska Petroleum ~y
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
3 ADDRESS OF OPERATOR
Pouch 6-612,
4. LOCATION OF WELL
At Surface:
Anchorage, Alaska 99502
1250' SNL, 4732' WEL, Sec. 34, TllN, R13E, UPM
9. WELL NO.
Y-3 (14-27-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11 SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 27, TllN, R13E, UPM
12. PERMIT NO.
79-88
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS iNCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK iN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES 1N HOLE CONDITIONS
July, 1980
Drilled 17 1/2" hole to 2700'. Ran 69 jts. 13 3/8" 72# L-80 Buttress casing to
2689'. Cewentedwith 3720 cu. ft. Halliburton Permafrost II cement. Installed
and tested BOPE. Cleaned out to 2651', tested casing to 3000 psi, okay. Drilled
out to 2730', ran leak-off test to 0.733 psi/ft, gradient. Directionally drilled
hole to 8948'. Ran BF~S/DIL/GR/SP, FDC/CNL/Cal. Ran 232 jts. 9 5/8" 47# L-80
Buttress casing to 8915'. Cemented in two stages: First stage with 1225 cu.ft.
Class G cement with 1% friction reducer; second stage through DVPacker at 2598'
with 133 cu. ft. Permafrost cement preceded by Arctic Pack. Cleaned out to 8875',
tested casing to 3000 psi, okay. Drilled out to 9070'. Directionally drilled
8 1/2" hole to 9915', ran open hole logs DIL/BHCS/GR/SP, FDC/CNL/GR/Cal.
Alaska
14 I hereby cert~ct
SIGNED~ TITLE District Drilling Engi~::~ATE ~ ' ~'' ~ ~
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservat,on committee by the 15th of the succeeding month,unless otherwise directed.
ALASKA OIL AND GAS CONSERVATION COMMISSION
Hoyle H. Hamilton
Chairman/Commission~
Thru.. Lonnie C. Smith
Commissioner ~
Harold R. Hawkins
Petroleum Inspector
July 30, 1980
To Witness B.O.P.E Test
We11 No. Y-3 , Sohio
Sec. 34-T11N-R13E-UPM.
Ju~¥ 20, 1980
i .... 'l~ft D.S. 17-2 where I witnessed a BOPE test, to $ohio's Y pad
to witness another BOPE test on well number Y-3.
July 21,. 1980
i witnessed"the BOPE tests on well number Y-3, there were no
failures. I filled out an AO&GCC report, attached to this memo.
When it was time to test the lower pipe rams, the driller said
t]aat they ~oul~t be tested with the test plug. (Referring to
the O.C.T plug type tester which was used to test the upper
BOPE). I told John the O.C.T plug type tester could be turned
over (right side up), however because the driller said it
wouldn't work that way, John Schillereff ordered a CUP type
tester. I asked the driller how they had tested the lower pipe
rams before (when the test was waived). He said he didn't see
how they could have been tested. O.C.T. later confirmed to John
Schillereff that the test plug was upside down.
In summary=
I witnessed the BOPE tests that Rowan Drilling performed on well
number Y-3, for Sohio. Tests were satisfactory.
HRH ~mm
· STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
.Inspector /~A
Operator -3 ~
Well V- 3
/
Location: Sec
Drilling Contractor
Date.
Representative
Permit
~-.~."C a sing
Representat iv~
Location, General
Well Sign
General Housekeeping
Reserve pit
Rig
ROPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Pressure
ACCUMULATOR SYSTEM
Full Charge Pressure _~6~d9 psig
Pressure After Closure / ~6; 6) psig
200 psig Above Precharge Attained: / min~__sec
Full Charge Pressure Attazned: ~ min-- sec
Controls: Master ~/F
,
Remote dP/f Blinds switch cover
Kelly and Floor Safety Valves
Upper Ke 1 ly
Lower Kelly
Ball Type
Ins ide BOP
Choke Manifold
No. Valves
No. flanges ~
A~.j ustable Chokes_
Hydrauically operated choke. /
Test Pressure
Test Pressure
Test Pressure /~/~
Test Pressure
Test Pressure ~-~
Test Results: Failures .~'~ .~/.~? Test Time ~
Repair or Replacement of failed equipment to be made within
·
Inspector/Commission office notified.
Remarks: .~/-~.~ ~-~ bB£ ~ ~/~/~z-~d/~F
hrs.
----- days and
Distribution
orig. - AC&GCC
cc - Operator
cc - Supervisor
DATE -3-u
T~T FLUID
ACCUMULATOR VOLU~E
TEST ~PE: ~WEEKLY ~FLANGE L
~CASING SET
~STCASING: I~E "AT~~ '.
PRESSURE & PERFORMANCE TESTS:
TfiST
UNIT PRESSURE
BLIND RAM
PIPE PAM
PIPE RAM
CHOKE MANIF.
KELLY COCK
KELLY VALVE ~2
INSIDE BOP
KELLY HOSE
STAND PIPE
CHC, KE LINE,~
-'i~ILL LINE
COMN)~
-COM/~
cO-~M
RI S ENG
-)_ E_N_ g BO__ p
2 F_NG MAN
--
3
~ ~E~
~ ~EOL ,,
-5 'AT TEC~
BOSc~PL ';-M. ASKA PETROLEUM COMPANY
.Z~IPMENT TEST REPOi:I~ -
;TACK--LIST ALL ITEMS TOP TO BOTTOM,
JFACTURER AND TYPE, SIZE OF RAMS, ETC.
ACCUMULATOR
& PUMPS
CLOSING
TIME
ACCUMULATOR ONLY
CLOSING RECHARGE
TIME TIME
/
TEST TOOL: I~]PLUG, II_CUP, O PACKER~
CASING TESTED: ~ (,, ;5 ~ FT. TO 30 ~ O PSI.
ACCUMULATOR RECHARGE: _.,~L00(~ PSI BEFORE TEST,
.. I ~ 430 PSI AFTER CLOSING ALL BOP'S,
~-/:/,,,~ ¥~.~cc MIN. RECHARGE TIME.
BOP DRILL SEC.
TRIP DRILL SEC.
NITROGEN PRECHARGE: 1
4. 5. 6.__ 7. 8.
9. . .10. 11. __12. 13.
14. ~15. __16.
EQUIPME.~T CHECKLIST yES NO'
CIRCULATING'HEAD ON FLOOR
~-INSI'DE B~P ON FLOOR &'sUBs '' V
~-KELLY 'VALVES ON FLOOR & sUBs '
' ~SP......_Ai~. KELLy VALVE
~ , f
PVT sYsTEM OPERATING ............ ., , .~
J -~L'OW SENSOR OPERATING'' v"
STROKE couNTER OPERA'riNG ''
i' TRIPTANK ....
LOCKING SCREWS ON BOP & ALL VALVES '
OPERATE EASILY. v/
I"""EMoTESTATION opERATI'NG'' _ v/
-BoP HAI~IDWHEELS AVAILABLE " /~ //~,
i' GAS sNIFFER OPE~ATI.N'~.' .....
BARITE ON HAND (O ~k
GEL ON HAND "~ 0
WATER ON HAND ~ O ~
SURFACE MUD VOLUME
HYDRAULIC OIL ON HAND
SACKS
.SACKS
.BBL
BBL
DRUMS
NITROGEN BACKUP SYS ..... ~ .... NO. OF
BOTTLES HOOKED UP, AT
NITROGEN PRESSURE.
oo ooRECE1V[D
JUL 0
Al~.ska 0i~ & '. ,
MALFUNCTIONS & COMMENTS (ITEMIZE ALL LEAKS, MALFUNCTIONS, MISSING EOUIPMENT, ETC., AN[~R~-iii}~ ?AKEN.)
SUPERVISOR'
TO ~E COMPLETED AND PUT ON FILE FOR EACH BOP TEST.
AK Form 5800-3 (12/79)
Initiated by: DR-JV
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
July 3, 1980
Alaska Oil & Gas Conservation Cc~mission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-3 (14-27-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-named well
for the month of June, 1980.
RHR: ja
Enclosures
cc: Well File #17
Yours very truly,
R. H. Reiley
District Drilling Engineer
FormNo 10-404REV 3-1-70 ( SUBMIT IN DUPLICATE (
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. AP! NUMERICAL CODE
50-029-20411
6. LEASE DESIGNATION AND SERIAL NO
ADL 28287
OiL [] GAS E]
2 NAME OF OPERATOR
Sohio Alaska Petroleum ~y
3 ADDRESS OF OPERATOR
Pouch 6-612 gnchoracle, Alaska 99502
4. LOCATION OF WELL
at surfaoe
1250' SRB, 4732' bliP, SOC. 34, TllN, R13E, UPM
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
Y-3 (14-27-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11 SEC T R. M (BOTTOM HOLE
OBJECTIVE)
Sec. 27~ Ti]N, R13E, UPM
12. PERMIT NO
79-88
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
June, 1980
Spud well at 1730 hrs. 6/30/80. Drilled 17½" hole to 800'.
Jr!L- 7
14. ! hereb ~
SIGNED ~--..- ~. ~ ~ ~ TITLEDis~i~ Drill~o ~n~ATE 7' ~ '~ ~
NOTE-Report on th~s form ~s required for each~lendar month, regardle~ of the ~atus o~ operatiom, and mu~ be filed in duplicate w~th the
oil and gas conservation comm~tt~ by the l~th of the succ~ing month,unl~ otherwise d~r~t~.
( (
November 20, 1979
Re Prudhoe Bay Unit No. ¥-3
Sohio Petroleu~ Company
Per-it No. 79-88
SUr. LOC.: 1250~SNL~ 4732~WEL, Sec 34, TZ1N, R13E, UPM
Bottomhole Loc.: 200*NSL, 180t BWL, Sec 27, TllN, R13E, UPM.
Mr. P. R. =udd
~istriot Drilling Engineer
Sohio Petroleum Company
l~uoh 6-612
Anchorage, Alaska 99502
Dear Hr. Judd
Enclosed is the approved application for permit to drill the
above referenced wel 1.
Well samples, core chips and a mud log are required. A
directional survey is required If available, a tape contain-
ing the digitized log information on all logs shall be submitted
for copying except experimental logs~, velocity surveys and
dipmeter surveys.
Many rivers in Alaska and their drainage systems have been
classified as i~portant for the spawning or migration of
anadromous fish. Ope.rations in these areas are subject to AS
16 50.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations
you may he contacted by the Habitat Coordinator*s office,
Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
(
Mr. P. R. Judd
Prudhoe Bay Unit No. Y-3
-2-
November 20, ~1979
c~nmencing operations ~ou may be contacted by a representative
of the Department of Environmental Conservation.
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska
Department of Labor is being not~fied of the issuance of this
permit to dril 1.
To a~d us in scheduling field work ~e would appreciate Four
notifying this office within 48 hours after the well is
spudded, We would also like to be notified 8o that a repre-
sentative of the commission may be present to witness testing
of blowout preventer equ£pment before sur£ace casing shoe is
drilled.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
Very truly yours,
Hoyle H. Hamilton
Chairm~ of ~Y ORD2R OF THE COMmiSSiON
Alaska O~1 ~ Gas Conse.rvat~on C~ss~on
Enclosure
oct Department off Fish & Game, Habitat Section w/o encl.
Dep&rt~ent of Environmental Conservation
Department of Labor; Supervisor, Labor Law Compliance
D~v~m~on w/o encl.
SOHIO PETROLEUM COMPANY
D,vision of Sohi~ Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
November 9, 1979
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Alaska Oil & Gas Conservation C~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-3 (14-27-11-13)
Enclosed are the following docunents:
1. Application for Permit to Drill, in triplicate,
2. Proposed Drilling Program Outline,
3. Our check for $100.00 to cover permit filing
fee,
4. Surveyor's plat showing well location.
PRJ: ja
Enclosures
cc: Well File #17
Yours very truly,
SOHIO PETRO~ COMPANY
P. R.' Judd
District Drilling Engineer
Fo~m IO-401 SUBMIT IN TRIPLICATE
( ' (Other instruct ~o?/~-.
REV. 9-1-7 8 reverse s,de~'
STALE OF ALASKA ~
la- TYPE OF WORK
b. TYPE OF WELL
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL OR DEEPEN
DRILL [] DEEPEN ['-]
OIL [~ GAS SINGLE MULTIPLE
WELL WELLO OTHER ZONE [~ ZONE
NAME OF OPERATOR
So1'~.o Pe~'ole~xn ~y, D±v. 5o1~o Natural l~~s ~¥
3. AODR~ OF O'~TOR
Pouch 6-6.12, Anch=rage, Alaska 99502
4. LOCATION OF W~LL At surface
1250' SNL, 4732' ~,, Sec. 34, TllN, R13E, UPM
At ~opo~d ~o~ rune
200' NS~, 180' ~;I.., .~. 27, TllN, R13E, UPM
13. DISTANCE IN MILE5 AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
10 ~i.les NW of ~rs~
AP1 950-029-204!! ,,
5.
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28287
7 IF INDIA.¼. ALLOI=fEE OR TRIBE NAME
8. b,~lT FARM OR LEASE NAM~E
~ Bay Unit
9. WELL NO.
¥-3 {14-27-11-13)
l0 FIELD A.~'D POOL, OR WILDCAT
Prudtx~ Bay, P~_~_hoe Oil
11. SEC., r., IL, M., (BOFfOM Pool
HOLE OB~CfIV~
14. BOND INFORMATION.
nE Blanket s~-ety.~dlo,~. ~ican Insurance Co. 3348616
15. DISTANCE FROM PROPOSED *
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT.
(Also to neat~t drig. unit, if any)
4030' south of
ADL 28284
i16. No. OF ACR~ IN LEASE
2560
~9. PROmSEDDE~.
9835'~D 9620'TVD
18. DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING, COMPLETED,
OR .APPLIED FOR, FT.
3443' NE of Put River 33-11-13
21. ELEVATIONS (5~ow whether DF, RT, CR, etc.)
Est. ~ = 80' AMSL
*n,o.., $100,000.00
1% NO ACRES ASSIGNED
TO THIS WELL
160
20 ROTARY OR CABLE TOOLS
22. APPROX. DATE WORK WILL START
December 25, 1979, .
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE' ' ~iZE OF CASING WEIGHT PER FOOT GP~DE MDSETTING DEFrHT~ Q~anmy of cement
36" 30"x20,' ~tla~ CDr ~uctor' 110' 110' 10 cu.yd~.. Arcticset concrete
, .17½" 13 3/8" 72~ L-80 2700' 2700' 5022 cu.ft. Pe~ma. frost II
12%" 9 5/8" 479 L-80 8995' 8780' ~232 cu.ft. Class G:130 cu.ft.
R~" 7" 299 L-80 9835' 9620' 254 ca. f%. Cq ~_~s G
, , ,
?C
See attached proposed drilling program.
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal ~s to deepen gzve data on present producnve zone and pro~
new pwducUve zone. if proposal ~s to drill or deepen dtrectmnally, g~ve pertinent data on subsurface locattom and measured and =~e
vetUcal depths. Gwe blowout prevente~ pro.am.
DATE
District
roLE Drilling_ Engineer
(Tim space for State offk~ use)
S~PLES AND CORE CHIPS REQUIRED I I~D LOG
1~ v~s D NO ! [] v~ [] NO
DIREC~ONAL SURVEY REQUIRED
[~'ES F']NO
CONDITIONS OF APPROVAL, IF ANY
OTHER REQUIREMENTS.
A.P.I. NUMERICAL CODE
50-029-20411
PERMIT NO. 79-99
APPROVED BY ~~~, ~ TITLE Chai~tlaD. *See Instruction On Reverse Side
APPROVAL DATE ?,~C~'~P-~r 20. 1979
DATE 11/20/79
PRDPOSED DR/I.TJNG AND CC~P~~ PROGRAM
Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated
conductor to surface using Arcticset concrete.
Drill 17 1/2" hole to 2700' and cemant 13 3/8" 72# L-80 Buttress casing to
surface using 5022 cu. ft. Pen~afrost II ce~ant.
Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer frcm 13 3/8" casing point to T.D.
Directionally drill 12 1/4" hole to 8780'+- TVD. Run 9 5/8" 47# L-80 Buttress
casing to 8780' TVD and cement first stage with 1232 cu. ft. cement. C~uent
second stage through D.V. packer collar at 2600'+_ with 130 cu. ft. Penuafrost C
cement. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus
will be Arctic Packed.
Directionally drill 8 1/2" hole to T.D. at 9620'~ TVD. C~uent 7" liner to
500' inside 9 5/8" casing shoe with 254 cu.ft. Class G cement with 18% salt.
Run 7" 26# L-80 Atlas Bradford IJ-4S tubing with a production packer assembly
at 8252'+- TVD. A subsurface safety valve with dual control lines will be
placed at 2000'+ Displace tubing to diesel
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of proposed
perforations to be sutmuitted on Sundry Notice to follow.
04
OI
02
04
OI
02
03
04
I0 20 30 40
I ~0 2.,0 30 40 {
'o Y-~
I
!
28
L mbo:
]( Proposed )
33
PORTION OF
SCALE I
~ L~T : 70°16'0s.61''
r- ~ LONG:148°49'21 96"
I X: 645,575
I Y :5,~9,065 ~ 4
I I
1. I0 N.
T II N, R 13 E, UM
": I/2 MILE
CERTIFICATE OF SURVEYOR
I hereby certify that lam properly registered to
practice land surveying in the State of Alaska and that this plat
represents a location survey of the wellpad shown and the wells
thereon. This survey was made by me or under my supervision
and all dimensions and other details are correct. Bottom hole
locations are furnished by others.
Date Surveyor
~ ur
Z.%
~.~......,$:.'.....~. .... : ....
· CONDUCTOR HOLES
PAD DETA_II_
SCALE I":
T
( 31-~?-I1-1~ )
(~.2-27-11-13 )
( 14-,~?-11-13 )
(43-2~-11-13)
( 24-34-11-13)
(25
·
· Y'-6
· -o
SUMP : I'
~--- 20' · [~
NOTE
NE I/4 & NW I/4 PROTRACTED SEC 33 & 34~T fiN, R 13F_,U M~AIC
Surveyed for
Plat dated Au(] 30, 1979 changed to
Oct 2, 1979 Bottom hole loc !,5
6 chalged
RECEIVED
Alaska Oi~ & G,~
.....
AS- STAKED
PAD
SOHIO PETROLEUM CO.
I ii i
Surveyed by
F.M. LINDSEY & ASSOC.
LAND & HYDROGRAPHIC SURVEYORS
2502 West Northern L~ghts Boulevard Box
Anchorage AIQskQ
I I '
I0.
12.
13.
15.
1.
2. Is well to be located in a defined pool .............................
3. Is a registered survey plat attached ................................
4. Is well located proper distance frcm property line ..................
5. Is well located proper distance frcm other wells ....................
6. Is sufficient underdicated aCreage available in this .pool ...........
7. Is well to be deviated ...............................................
8. Is operator the only affected party .................................
9. Can permit be approved before ten-day Wait ..........................
Does C~erator have a bond in force ............. .. ·
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is conductor string provided ........................................
Is enough c~ment used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings
1¸6 o
17.
18.
CHECK LIST 'FOR NEW %~TL PERMITS
Is the permit fee attached ..........................................
19.
Will c~ment cover all known productive horizons .....................
Will surface casing protect freSh water zones .......................
Will all casing give adequate safety in collapse, tension and burst.
Does BOPE have sufficient pressure rating - Test to J--~, ~ psig .
Approval Recommended:
Additional Requirements: .,("s.,,~_7~,~ ~ /'4..~ ~
Lease & Well ~NO. ~,~ ~
Item Approve
(1) Fee ~g~
/
Remarks
(2) LOc.
(4) ~._~_.~9.-~
(5) BOPE ~m~
Engineering:
rev: 06/21/7
Geology:
·
Well History File
APPENDIX
Information of detailed nature that is not
padiculafly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
R-01
PRUDHOE BAY
Run 1'
08 - January - 1995
MSICO
(Carbon/Oxygen)
ATLAS
Atlas Wireline Services
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
R - 01
500292035300
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
25-JAN-94
3096.04
L. KOENN
P. COLLINS
32
12N
13E
615
860
54.27
20.27
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING 9.625 8845.0
3RD STRING 7.000 9718.0
PRODUCTION STRING 5.500 8251.0
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
FCC
8881.5
8916.0
8954.0
8957.0
8959.5
8971.0
8981.0
8990.5
8992.0
8994.5
9012.5
9028.5
9033.0
BHCS
GRCH
2
1
07-MAY-79
SWS
BASELINE DEPTH
8881.0
8915.0
8953.0
8956.0
8958.0
8971.0
8980.5
8990.0
8992.5
8994.5
9012.0
9028.5
9033.0
EQUIVALENT UNSHIFTED DEPTH
47.00
29.00
17.00
9058.0
9086.5
9097.0
9117.5
9173.5
9197.0
$
REMARKS:
9058.0
9087.0
9097.0
9117.0
9172.0
9196.0
CARBON/OXYGEN LOG.
LOG TIED TO SONIC LOG DATED 08-MAY-79.
WELL WAS SHUT-IN 07-NOV-93. NO PRODUCTION DATA IS
AVAILABLE.
/ ? ?MATCH1. OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
MSI 8875.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE
PASS NUMBER:
STOP DEPTH
9200.0
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
$
REMARKS: PASS 1.
FCC WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
ALL MSICO CURVES WERE SHIFTED WITH FCC.
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
1
2
3
4
5
6
7
8
9
10
Name Tool Code Samples Units
FCC MSI 68 1 CPS
CO MSI 68 1
CASI MSI 68 1
SICA MSI 68 1
CHLR MSI 68 1
CIM1 MSI 68 1
CIM2 MSI 68 1
LPOR MSI 68 1 PU
MSID MSI 68 1 SU
TTLC MSI 68 1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
* DATA RECORD (TYPE# 0)
Total Data Records: 31
1018 BYTES *
Tape File Start Depth = 9205.000000
Tape File End Depth = 8860.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7602 datums
Tape Subfile: 2 138 records...
Minimum record length: 50 bytes
Maximum record length: 1018 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
MSI 8879.0 9200.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE FCC
PASS NUMBER: 1
BASELINE DEPTH FCC
8881.0 8881.5
8908.5 8909.0
8915.0 8915.5
8920.0 8920.5
8953.5 8954.0
8956.0 8956.5
8958.5 8959.5
8969.5 8969.5
8971.0 8971.0
8982.5 8983.0
8990.5 8990.5
8997.5 8997.5
9008.0 9008.0
9012.5 9013.0
9015.5 9016.0
9018.5 9018.5
9025.5 9025.5
9029.0 9029.0
9032.5 9032.0
9036.5 9036.5
9042.0 9042.0
9048.0 9048.0
9058.0 9058.0
9060.5 9060.5
9066.5 9066.0
9071.5 9071.5
9078.5 9079.5
9081.0 9081.5
9086.0 9086.5
9093.0 9093.0
9108.0 9108.0
9117.5 9117.0
9119.5 9119.0
9133.0 9132.5
9145.5 9144.5
9148.0 9147.5
9164.5 9164.0
9173.0 9172.5
EQUIVALENT UNSHIFTED DEPTH
9182.5
9188.5
9193.5
9196.5
$
REMARKS:
9182.0
9188.0
9193.5
9196.5
PASS 2.
ALL MSICO CURVES WERE SHIFTED WITH FCC.
/ ? ?MATCH2. OUT
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
1 FCC MSI 68
2 CO MSI 68
3 CASI MSI 68
4 SICA MSI 68
5 CHLR MSI 68
6 CIM1 MSI 68
7 CIM2 MSI 68
8 LPOR MSI 68
9 MSID MSI 68
10 TTLC MSI 68
1 CPS
1
1
1
1
1
1
1 PU
1 SU
1 CPS
* DATA RECORD (TYPE# 0)
Total Data Records: 31
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
40
1018 BYTES *
Tape File Start Depth = 9205.000000
Tape File End Depth = 8860.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7602 datums
Tape Subfile: 3
Minimum record length:
Maximum record length:
105 records...
50 bytes
1018 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
MSI
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE FCC
PASS NUMBER: 1
START DEPTH
8880.0
BASELINE DEPTH FCC
8902.5 8903.0
8923.0 8923.5
8944.0 8945.0
8944.5 8945.5
8945.5 8946.0
8948.0 8948.5
8950.0 8951.0
8962.5 8963.5
8967.0 8967.0
8983.0 8983.5
8988.5 8989.0
8990.5 8990.5
8993.0 8992.5
8995.5 8995.5
8999.5 8999.5
9013.0 9013.5
9022.5 9023.0
9023.5 9023.5
9026.0 9026.5
9030.0 9030.5
9035.5 9036.0
9036.5 9036.5
9059.0 9059.0
9064.5 9065.0
9066.5 9067.0
9067.5 9067.5
9073.5 9073.5
9079.5 9080.5
9081.0 9082.0
9086.5 9087.0
9104.5 9105.5
9109.0 9109.5
9110.0 9110.0
9113.5 9113.5
9121.0 9121.0
9125.0 9125.5
9126.0 9126.5
9127.0 9127.0
STOP DEPTH
9200.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
9137.0
9144.0
9174.5
9188.5
9194.5
$
REMARKS:
9137.0
9143.5
9174.0
9188.5
9194.5
PASS 3.
ALL MSICO CURVES WERE SHIFTED WITH FCC.
/ ? ?MATCH3. OUT
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 FCC MSI 68
2 CO MSI 68
3 CASI MSI 68
4 SICA MSI 68
5 CHLR MSI 68
6 CIM1 MSI 68
7 CIM2 MSI 68
8 LPOR MSI 68
9 MSID MSI 68
10 TTLC MSI 68
1 CPS 4
1 4
1 4
1 4
1 4
1 4
1 4
1 PU 4
1 SU 4
1 CPS 4
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
40
* DATA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 31
Tape File Start Depth = 9205.000000
Tape File End Depth = 8860.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 15204 datums
Tape Subfile: 4
Minimum record length:
Maximum record length:
106 records...
50 bytes
1018 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
MSI
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE FCC
PASS NUMBER: 1
START DEPTH
8878.0
BASELINE DEPTH FCC
8881.5 8881.5
8908.5 8908.5
8915.0 8915.5
8919.5 8920.0
8927.5 8928.5
8943.5 8944.5
8944.5 8945.0
8957.5 8958.0
8960.0 8961.0
8962.5 8963.5
8967.0 8967.0
8968.0 8967.5
8983.0 8983.0
8988.5 8988.5
8990.5 8990.5
8992.5 8992.0
8995.5 8995.0
9000.0 8999.5
9001.0 9001.0
9012.5 9013.0
9018.5 9018.5
9075.0 9075.0
9075.5 9076.0
9091.5 9092.0
9092.0 9093.0
9094.0 9095.0
9095.0 9095.5
9096.5 9097.0
9111.5 9111.5
9114.0 9114.0
9119.0 9118.5
9124.0 9123.5
9125.5 9124.5
9130.5 9129.5
9132.0 9131.5
9148.0 9147.5
9157.0 9156.0
9163.0 9162.0
STOP DEPTH
9200.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
9187.0
9187.5
9188.0
9193.5
$
REMARKS:
9186.5
9187.0
9188.0
9193.5
PASS 4.
ALL MSICO CURVES WERE SHIFTED WITH FCC.
/ ? ?MATCH4. OUT
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
10 Curves:
Name Tool Code Samples Units
1 FCC MSI 68 1 CPS
2 CO MSI 68 1
3 CASI MSI 68 1
4 SICA MSI 68 1
5 CHLR MSI 68 1
6 CIM1 MSI 68 1
7 CIM2 MSI 68 1
8 LPOR MSI 68 1 PU
9 MSID MSI 68 1 SU
10 TTLC MSI 68 1 CPS
* DATA RECORD (TYPE# 0)
Total Data Records: 31
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
40
1018 BYTES *
Tape File Start Depth = 9205.000000
Tape File End Depth = 8860.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 15204 datums
Tape Subfile: 5
Minimum record length:
Maximum record length:
105 records...
50 bytes
1018 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: .5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
MSI
$
REMARKS:
1, 2, 3, 4
AVERAGED PASS.
THE CURVES FCC, CO, SICA, & CASI WERE AVERAGED FOR ALL
FOUR PASSES.
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
1 FCC MSI 68
2 CO MSI 68
3 CASI MSI 68
4 SICA MSI 68
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 CPS 4
1 4
1 4
1 4
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
16
* DATA RECORD (TYPE# 0)
Total Data Records: 14
1006 BYTES *
Tape File Start Depth = 9205.000000
Tape File End Depth = 8860.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 18660 datums
Tape Subfile: 6 36 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MSI 8874.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
9200.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CO CARBON/OXYGEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
08-JAN-95
FSYS JlV2 BETA RELEASE 4
1149 08-JAN-95
9206.0
9210.0
8880.0
9203.0
120.0
YES
TOOL NUMBER
2727XA
.000
9718.0
.0
SEAWATER / DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
.0
.0
FAR COUNT RATE LOW SCALE (CPS) :
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS) :
TOOL STANDOFF (IN):
REMARKS: PASS 1.
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
1 FCC MSI 68 1
2 FCCl MSI 68 1
3 CO MSI 68 1
4 CASI MSI 68 1
5 SICA MSI 68 1
6 CHLR MSI 68 1
7 CIM1 MSI 68 1
8 CIM2 MSI 68 1
9 CISB MSI 68 1
10 EDIT MSI 68 1
11 GATE MSI 68 1
12 HCHL MSI 68 1
13 LPOR MSI 68 1
14 MCAL MSI 68 1
15 MSID MSI 68 1
16 SPD MSI 68 1
17 SPOR MSI 68 1
18 TTLC MSI 68 1
CPS
CPS
PU
SU
F/MN
PU
CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 12 375 07 6
4 4 11 769 82 5
4 4 00 870 87 5
4 4 35 334 87 5
4 4 69 143 51 5
4 4 11 769 82 5
4 4 11 769 82 5
4 4 62 887 90 5
4 4 83 275 48 0
4 4 46 862 88 1
4 4 83 275 48 0
4 4 11 769 82 5
4 4 83 275 48 0
4 4 83 275 48 0
4 4 83 275 48 0
4 4 59 104 29 1
4 4 83 275 48 0
4 4 51 656 99 6
72
* DATA RECORD (TYPE# 0)
Total Data Records: 107
994 BYTES *
Tape File Start Depth = 9204.000000
Tape File End Depth = 8859.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 41444 datums
Tape Subfile: 7 178 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MSI 8878.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CO CARBON/OXYGEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
9201.0
08-JAN-95
FSYS J1V2 BETA RELEASE 4
1459 08-JAN-95
9206.0
9210.0
8880.0
9203.0
120.0
YES
TOOL NUMBER
2727XA
.O00
9718.0
.0
SEAWATER / DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
REMARKS: PASS 2.
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 FCC MSI 68 1 CPS 4
2 FCCl MSI 68 1 4
3 CO MSI 68 1 4
4 CASI MSI 68 1 4
5 SICA MSI 68 1 4
6 CHLR MSI 68 1 4
7 CIM1 MSI 68 1 4
8 CIM2 MSI 68 1 4
9 CISB MSI 68 1 4
10 EDIT MSI 68 1 4
11 GATE MSI 68 1 CPS 4
12 HCHL MSI 68 1 4
13 LPOR MSI 68 1 PU 4
14 MCAL MSI 68 1 4
15 MSID MSI 68 1 SU 4
16 SPD MSI 68 1 F/MN 4
17 SPOR MSI 68 1 PU 4
18 TTLC MSI 68 1 CPS 4
4 12 375 07 6
4 11 769 82 5
4 00 870 87 5
4 35 334 87 5
4 69 143 51 5
4 11 769 82 5
4 11 769 82 5
4 62 887 90 5
4 83 275 48 0
4 46 862 88 1
4 83 275 48 0
4 11 769 82 5
4 83 275 48 0
4 83 275 48 0
4 83 275 48 0
4 59 104 29 1
4 83 275 48 0
4 51 656 99 6
72
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 104
Tape File Start Depth = 9205.000000
Tape File End Depth = 8868.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 44292 datums
Tape Subfile: 8 175 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MSI 8879.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CO CARBON/OXYGEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
9201.0
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
08-JAN-95
FSYS J1V2 BETA RELEASE 4
1924 08-JAN-95
9206.0
9210.0
8880.0
9203.0
120.0
YES
TOOL NUMBER
2727XA
.000
9718.0
.0
SEAWATER / DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
.0
.0
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS) :
TOOL STANDOFF (IN):
REMARKS: PASS 3.
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 FCC MSI 68 1 CPS 4
2 FCCl MSI 68 1 4
3 CO MSI 68 1 4
4 CASI MSI 68 1 4
5 SICA MSI 68 1 4
6 CHLR MSI 68 1 4
7 CIM1 MSI 68 1 4
8 CIM2 MSI 68 1 4
9 CISB MSI 68 1 4
10 EDIT MSI 68 1 4
11 GATE MSI 68 1 CPS 4
12 HCHL MSI 68 1 4
13 LPOR MSI 68 1 PU 4
14 MCAL MSI 68 1 4
15 MSID MSI 68 1 SU 4
16 SPD MSI 68 1 F/MN 4
17 SPOR MSI 68 1 PU 4
18 TTLC MSI 68 1 CPS 4
4 12 375 07
4 11 769 82
4 00 870 87
4 35 334 87
4 69 143 51
4 11 769 82
4 11 769 82
4 62 887 90
4 83 275 48
4 46 862 88
4 83 275 48
4 11 769 82
4 83 275 48
4 83 275 48
4 83 275 48
4 59 104 29
4 83 275 48
4 51 656 99
6
5
5
5
5
5
5
5
0
1
0
5
0
0
0
1
0
6
72
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 105
Tape File Start Depth = 9205.000000
Tape File End Depth = 8867.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 67152 datums
Tape Subfile: 9 176 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 4
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MSI 8877.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CO CARBON / OXYGEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
STOP DEPTH
9200.0
08-JAN-95
FSYS JlV2 BETA RELEASE 4
2025 08-JAN-95
9206.0
9210.0
8880.0
9203.0
120.0
YES
TOOL NUMBER
2727XA
.O0O
9718.0
.0
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
SEAWATER / DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
REMARKS: PASS 4.
$
CN : BP EXPLORATION
WN : R - 01
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
18 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 FCC MSI 68 1 CPS 4
2 FCCl MSI 68 1 4
3 CO MSI 68 1 4
4 CASI MSI 68 1 4
5 SICA MSI 68 1 4
6 CHLR MSI 68 1 4
7 CIM1 MSI 68 1 4
8 CIM2 MSI 68 1 4
9 CISB MSI 68 1 4
10 EDIT MSI 68 1 4
11 GATE MSI 68 1 CPS 4
12 HCHL MSI 68 1 4
13 LPOR MSI 68 1 PU 4
14 MCAL MSI 68 1 4
15 MSID MSI 68 1 SU 4
16 SPD MSI 68 1 F/MN 4
17 SPOR MSI 68 1 PU 4
18 TTLC MSI 68 1 CPS 4
4 12 375 07
4 11 769 82
4 00 870 87
4 35 334 87
4 69 143 51
4 11 769 82
4 11 769 82
4 62 887 90
4 83 275 48
4 46 862 88
4 83 275 48
4 11 769 82
4 83 275 48
4 83 275 48
4 83 275 48
4 59 104 29
4 83 275 48
4 51 656 99
6
5
5
5
5
5
5
5
0
1
0
5
0
0
0
1
0
6
72
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 104
Tape File Start Depth = 9204.000000
Tape File End Depth = 8867.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 69924 datums
Tape Subfile: 10 175 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 11 is type: LIS
95/ 1/24
01
**** REEL TRAILER ****
95/ 1/26
01
Tape Subfile: 11 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Thu 26 JAN 95 7:55a
Elapsed execution time = 9.89 seconds.
SYSTEM RETURN CODE = 0
1
1111
1111
11
I1
1i
11
11
11
11
11
111111
111111
000000
000000
O0 O0
O0 O0
O0 0000
O0 0000
O0 O0 O0
O0 OO O0
0000 O0
0000 O0
O0 O0
O0 O0
000000
000000
7777777777
7777777777
77
77
77
77
77
77
77
77
77
77
77
77
'000000
000000
O0 O0
O0 O0
O0 0000
O0 0000
O0 O0 O0
O0 O0 O0
0000 O0
0000 O0
O0 O0
O0 O0
000000
000000
7777777777
7777777777
77
77
77
77
77
77
77
77
77
77
77
77
666666
666666
66
66
66
66666666
66666666
66 66
66 66
66 66
66 66
666666
000000
000000
O0 O0
O0 O0
O0 0000
O0 0000
O0 O0 O0
O0 O0 O0
0000 O0
0000 O0
O0 O0
O0 O0
000000
000000
7777777777
7777777777
77
77
77
77
77
77
77
77
77
77
77
77
11
11
1111
1111
11
11
11
11
11
ll
11
11
1111
1111
11
11
44 44
44 44
44 44
44 44
44 44
44 44
4444444444
4444444444
44
44
44
44
44
44
P R B R R
*START* USER PCAL
MONITOR 8~$ KL10E]7
*START$ USRR PCAL
MONITOR 6bS RL10E37
PPPP RRRR
P P R R
P P R R
PPPP RRRR
P ~ R
P R R
P R R
[10Z07,60714] jOB
APR 80. *START*
[lOZO7,b0714] dOB
APR 80. *6TART*
U U DDDD
O U D D
O U D D
O O O D
U O O D
U U D D
UUUUU DDDD
SEQ.
SHiP
H H OOO fEEEE
H H 0 0 f
H H O 0 f
HHHHH 0 0 LEEE
H H 0 0 k
H H 0 O f
H H OOO EREEE
]218 DATE 28-AUG-80
t218 DATh 28-AUG-80
09:18:09
09:18:09
'~;
SSSSSSSS HH HH
SSSSSSSS HH HH
SS HH HH
SS HB HH
SS HH hH
SS HH HH
SSSSSS HHHHHHHHHH
S$SSSS HHHHHHHHHH
SS HH HH
SS HH HH
SS HH HH
SS HH HH
SSS$SSSS HH HH
SSSSSSSS HH HH
1I
II
Ii
ii
II
II
II
II
Ii
I1
II
II
I1
II
II
II
II
II
II
il
1I
II
PPPPPPPP
PPPPPPPP
PP PP
PP PP
PP PP
PP PP
PPPPPPPP
PPPPPPPP
PP
PP
PP
PP
PP
PP
T~T~TTTTT~ OOOOOO
TTTTTTTT~ OOOOOO
TT OO O0
TT O0 O0
~T 00 O0
TT O0 O0
TT OG OO
TT OO OO
TT OG OO
TT OO OO
TT OW OO
TT O0 O0
TT O00OO0
TT 000000
MONITOR*START*$wsUSEH~L10R3?PCAL APH[1010780[bOT14]*START*JOB SHiP SEQ. S218 DAT~ 28-AUG-80 09:18:09
?ILE: DS~H:$HI~ fO(2~5>[~0707 b0714] CREATED: 28-AUG-80 08:54:57
PRINI 6:28 AUG 80 0~:18:26
QUEUE SWITCHES: /FIGk:~ORT /COPIES:I
/SPACING:I /LIM1T:129 /FORMS:NORMAL
SHIPPING iNSTRUCTIONS
ISSUED 28-AUG-80 08:54
SHIP TO :
P.C.C.C.
VENTURA, CALIFORNIA
93003
BY PRR PCCC
YV ¥¥ EEEEEEEEEE BBHHRRB~
VV VV EE ~ RR
VV VV ~E ~ RH
VV VV EE ~H HR
VV VV EE ~R RR
VV VV EE~EEE ~HHRHRRH
VV VV EEEEEEEE RHRRRRHR
VV VV EE RB RH
VV VV EE R~ RR
VV VV EE Hh ~
V¥ VV EE H~ RR
VV EEEEE~EEkE hR RR
VV EEEEEEEEEE HR HR
IIIIII
IIIII£
II
II
II
II
I1
II
il
1I
II
II
IIIIII
IIIIII
Y~
YY
Y¥
YY
YY
YY
YY
Y¥
YY
~Y
000000 000000 11
000000 000000 11
00 O0 O0 O0 1111
00 O0 O0 O0 1111
O0 O000 O0 0000 11
O0 O000 O0 0000 11
00 O0 O0 O0 O0 O0 11
O0 O0 O0 O0 00 O0 11
0000 O0 0000 O0 1~
0000 O0 0000 00 11
O0 O0 O0 O0 11
O0 O0 O0 O0 11
000000 000000 11111l
000000 000000 111111
SSTAHT* USER PCAL [10707,b0114] ,JOB SHIP SEQ.
MONITOR $~8 KLIOEJ7 APR-80. ~8TART~
FILE: DS~M:VERIFY.O01<057>[10707 bO714j CHEATED:
PRINTED: 2B-AUG-80 09:1§:]5
OUEUE SWiICHES: /FILE:~OHT /COPIES:I
/5PACING:I /LIMIT:129 /FORMS:NORMAL
]218 DATE 28-AUG-BO
28-AUG-80 0q:16:47
09:18:09
LI~ V~HSION 15,~01 ?9/0)/26
8CHLUMB£RGER COMPUTING CENTER
10707,6071~
REEL HEADER
LENGTH: 112 BYTES
REEL NAME: P.C.A.L.
SkRV1CE NAME: EDIT
REEL CONTINUATION NUMBER: 01
PREVIOUS BEEL NAME:
COMMENTS: LIS FORMAT CUSTOMER TAPE
DATE: 801 8t28
TAPE HEADER
LENGTH: 132 BYTES
TAPE NAMe: 60714 DATE: 80/ 8/28
SERVICE NAME: EDIT
TAPE CONTINUATION NUMBE~: 01
PREVIOUS IAPE NAME:
COMMENTS: UNIQUE WEL~ IDENTiFICAtION NUMBER IS 50-029-20411
TAPE COMMENTS
RUN NO. ONE LOGGED 12-JUL-80
CASING:13.]7 IN. @ 2689 ~T. / BIT SIZE:12.25 IN. / ~LUID TYPE:LIGNO
DENS.:9.9 LB/G / PM:lO.50 / ¥[SC.:4~.0 / FLUID L05S:6.0 Mb /
RM:4.75 @ 57 D.~. / RMF:4.50 9 57 D.F. / RMC:5.00 ~ 57 D.f./
MAX TEMP.:I~4,0 D.F. /
RUN NO. IWQ bOGGED 2g-dub-80
CASING:9.875 IN. @ 8916 FT. / BlT SIZE:8.50 IN. /
~LUiD TY~EmOIL FAZ~ / DENS.=IO.20 LB/G / PH~ N/A / VISC.:65.00
~LUID LOSS:4.00 ML / MAX. TEMP.:lgo D.F. /
FILE HEADER
LENG%H: 62 BYTES
FILE NAME: EDI% .001
MAXIMUM PHYSICAL RECORD LENGTH:
PREVIOUS ~ILE NAME:
COMPANY : ~OHIO ALASKA PETRO.
WELL :
FIELD : PRUDHOE BAY
RANGE :
TOWNSHIP : lIN
SkCTI[)N
COUNTY : N. SLOPE
STATE : ALASKA
DENSITY : 800.
1024 BYTES
DATA ~U~MA'I SPECI~ICA~IUN
LENG[H: 650 BYTES
0
SiZE REP CODE ENTR~
1 66 0
DA]rUM SPECiFICAT10N BLOCKS;
UNI1 APl AP1 AP1 AP1 FILE SIZE SAM REP PROCESS INDICATORS
I DEPT
2 SP OIL
] ILD DIL
4 ILM OIL
5 SFLU DIL
6 GR DIL
7 DT DIL
8 GR
9 GR CNL
10 CALI CNL
i! DRHO ~DC
12 NPH! CNL
13 RHOB CNL
14 NRAT CNL
15 NCNL CNL
16 FCNL CNL
FT 0 0 0
NV 7 I 0
OH~M 7 12 46
OH~M 7 12 44
OHNM 7 22 1
GAPI 7 31 32
US/~ 7 52 32
GAPI 7 ]1 0
GAPI 42 {1 32
IN 42 28 1
G/C3 42 44 0
PU 42 68 2
O/C3 42 35 1
C/C 42 42 1
CPS 42 ]4 92
CPS 42 34 93
0 0 4 I b8
0 0 4 1 68
0 0 4 I 68
0 0 4 I 68
0 0 4 i 68
0 0 4 I 68
0 0 4 I 68
0 0 4 1 68
0 0 4 1 68
0 0 4 I 68
0 0 4 i 68
0 0 4 I 68
0 0 4 I b8
0 0 4 1 68
0 0 4 1 b8
0 0 4 I 68
USER DEFINED OUTPUT ARRAY
OUTPUT SP AT 2
OUTPUT
OUTPUT ILM AT 4
OUTPUT S~LU AI 5
OUTPUT GR A~ 6
OUTPUT DT AI 7
OUTPUT GR AT 8
OUTPUT GH AT 9
OUTPUT CALl AT 10
OUTPUT D~HO AT 1i
OUTPUT NPHI AT 12
OUTPU~ RHOB
OUTPUT NRAI
OUTPUT NCNL AI 15
OUTPUT FCNL AI 16
DEPTH
ggso.o00
9900,000
9800.000
9700.000
9600.000
9500.000
9400,000
9300,000
9200,000
9100.000
9000.000
MNEMONIC
SP
GR
CALl
N~AT
SP
G~
CALI
SP
GR
CALl
NRAT
SP
GR
CALi
NRAT
6P
GR
CALl
N~AT
SP
CALI
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
CALl
NRAT
SP
GR
CALl
NRAT
SP
CALl
NRAT
VALUE
-gg9,25
102.43
8,50
2,66
-999,25
102.43
8.41
2.61
-999.25
25,81
8,36
2,34
-999.25
22,25
8,39
2,52
-999,25
16,53
8,40
2.01
-999,25
19.26
8.44
2,5{
-999.25
15.22
8,41
1,68
-999,25
31,54
8,44
2,67
-999,25
38.84
8,41
2.35
-999.25
52,84
8.58
2,14
-999.25
107.12
8,73
3.44
MNEMONIC
ILD
DT
DRHO
NCNL
iLD
DT
DRHO
NCNL
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
ILD
DT
DRHU
NCNL
ILD
DT
DRBO
NCNb
lED
DT
DHHO
NCNL
VALUE
3.121
8~.375
-0,028
1554,000
3,088
83,{75
-0,000
2702,000
2.162
86.188
0.013
3128.000
2.861
90.000
-0.001
3152.000
4,402
78,375
0.012
3764,000
4.695
88.188
0.016
3210.000
3.643
75.188
0.001
4704.000
8,398
93,563
0,004
3240.000
13.766
83.000
0.019
3532.000
10,594
72,375
0,006
3886.000
1.265
1i8.188
-0.008
1910.000
MNEMONIC
ILM
O~
NPHI
FCNL
1LM
NPHI
~CNL
NPH1
FCNL
ILN
NPHI
FCN~.
1LM
NPHI
fCNL
VALUE MNEMONIC
3,~02 SFLU
lO2.438 GR
26,318 RHO8
596,500
3.381 SFLU
102.438 GR
24.121 RHOB
1032.000
2.584
25.813 GR
20,020 RHOB
1394.000
3.215 S~'LU
22,250 GR
22.656 RHOO
1282.000
5,367 SFLU
16.531 GR
15.088 RMOB
1995.000
ILM 5,746 SFLU
GR 19,266 GR
NPHI 22.803 RHOB
FCNL 1319,000
1bM 4,242/'~SFLU
GR 15,227 GR
NPHI iO,254 RHOB
~CNL 2818,000
NPHI
fCNL
NPHI
fCNL
NPHI
FCNL
GR
NPHI
fCNL
9.094 SFLU
31,547 GR
24.902 RHOB
1112.000
14,578 SFLU
38,844 GR
20.215 RHOB
1419.000
13.430 SFLU
52,844 GR
16,895 RHOB
1848,000
1,374 SFLU
10'7.125 GR
36,279 RHOB
569.000
VALUE
3.e, o2
69.500
2,268
3.381
69.500
2.650
2,584
33.125
2,375
3.215
28.234
2.385
5.367
19.594
2.395
5.746
18.750
2.336
20.172
2,482
9.094
41.000
2.424
14,578
47.813
2.4'17
13.430
b0.281
2.572
1,374
116.000
2.486
DEPTH
8900.000
8800.000
8700,000
8600.000
8500.000
84OO,O00
8300.000
8200.000
8100,000
80O0.00O
7900.000
MNEMUNIC
SP
GR
CALI
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
8P
GR
CALl
NRAT
GR
CAhI
NRAT
8P
GR
CALl
NBAI
6P
GR
CALl
NRAT
SP
GR
CALl
NBAT
8P
GR
CALl
NRAT
VAL
-22
101
10
3
-23
107
12
3
-2O
97
12
3
-29
93
15
3
-22
104
13
-26
96
13
3
-29
102
13
3
-31
70
13
2
-30
101
13
-29
91
13
3
-31
87
13
4
UE
.375
.938
.359
.773
.625
.688
.492
.854
.625
.250
.648
.119
.016
.938
.672
.820
.750
.375
.680
.691
.156
.938
.617
.945
.500
.313
.258
.840
.00o
.813
.133
.840
.b88
.375
.320
.699
.b25
.813
.117
.848
.375
.125
.211
.113
MNkMONIC
iLD
DT
DRHO
NCNb
IhD
DT
DRHO
NCNb
ibD
OT
DRHO
NCNb
ILD
DT
DRHO
NCNb
1LD
DT
DRHO
NCNL
ILD
OT
DRHO
NCNb
ILL
DT
NCNb
ILD
DT
DRHO
NCNb
iLL
DT
DRMO
NCNL
ILL
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
VALUE
1.424
118.188
0.090
1082.000
1.038
11b.563
0.137
1591.O00
1.qbO
96.375
0.100
1995.000
1.022
105.563
0.188
1606.000
1.146
117.750
0.137
1591.000
1.190
116.000
0.079
1735.000
1.358
111.188
0.039
1789.000
2.043
91.375
0.020
2186.000
0.933
118.000
0.052
1614.000
0.834
121.375
0.047
1593.000
1.052
118.561
0.056
1576.O00
MNeMONiC
ILM
GR
NPHI
fCNL
1LM
NPHI
fCNL
NPHI
fCNL
iLM
GR
NPH1
~CNL
1bM
GR
NPHI
FCNL
IbM
GB
NPHI
FCNL
NPHI
fCNL
GR
NPHI
~CNL
IbM
GR
NPHI
FCNL
IbM
GR
NPHI
fCNL
GR
NPH1
VALUE
1.555
101.938
39.209
418.500
1.11]
107.688
39.307
434.000
2.084
97.250
27.979
678.500
1.112
93.938
37.500
399.500
1.225
104.375
36.328
440.750
1.266
96.938
40.234
427.500
1.401
102.313
38.770
432.750
2.200
70.813
23.633
789.000
0.985
101.375
36.572
457.750
0.953
91.81]
38.965
396.25O
1.132
87.125
43.018
365.000
MNEMUNIC
SFLU
GR
RHOU
SFLU
GR
RHOB
GR
RHOB
SFLU
GR
RHUB
SFLU
GR
~HOB
8FLU
GR
RHUB
SFLU
GR
RHO0
SFLU
GR
RHOB
SFLU
GR
RHO~
SFLU
GR
RHOB
SFLU
GR
VALU~
2.2]6
136.125
1.984
1.578
115.188
2.467
2.445
U9.688
2.557
1.584
97.b88
2.359
1.57b
108.250
2.533
1.763
110.125
2.416
1.b89
116.938
2.418
2.949
71.500
2.473
1.197
102.063
2.449
1.350
94.375
2.381
1.372
94.93U
2.3bl
7800.000
7700. 000
7600.000
7500.000
740O°000
7300.000
7200.000
7100.000
7000.000
6900.000
6800.000
NN~NONIC
SP
CALl
NRAT
SP
GR
CALl
NRAT
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
GR
CAS!
SP
GR
CALl
NRAT
SP
CALl
NRAT
SP
GR
CALl
NRAT
SP
CALl
NRAT
SP
CALl
NRAT
VAL
-35
185
13
4
-36
181
12
4
-39
118
13
3
-47
130
13
3
-34
143
13
3
-36
205
12
J
-37
91
14
3
-38
98
13
3
-38
91
13
3
-38
82
13
3
-38
70
13
2
0E
.469
.50O
.391
.035
.625
.375
.844
.117
.000
.063
.219
.857
.125
.625
.813
.559
.125
.625
.260
.816
.094
.750
.969
.365
.500
.500
.0lb
.387
.250
.438
.633
.434
.000
.750
.539
.395
.b25
.500
.438
.135
.75O
.250
.438
.945
MN
EMONiC
1LD
DT
DRHO
NCNb
bT
DRHO
NCNb
ILD
DT
DJ<HO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHU
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNL
ILD
DT
DRHO
NCNb
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILO
DT
DRHO
NCNb
VA6UE
1.816
118.188
0.039
1624.000
1.728
113.750
0.025
1701.000
1.875
112.~75
0.042
1851.000
2.547
107.375
0.050
1802.000
0.987
114.750
0.048
1749.000
2.146
IO4.~75
0.033
1779.000
1.635
102.188
0.030
216b.000
1.841
99.563
0.017
2168.000
1.852
99.375
0.023
2114.000
2.102
97.000
0.021
2250.000
2.777
89.375
0.038
2334.000
MNkMON1C
ILM
Gf~
NPHI
~-CNL
ILM
GR
NPHI
FCNL
ILM
NPHI
FCNL
ILN
G~
NPHI
PCNL
ILM
G~
NPHI
FCNL
ILM
G~
NPHI
fCNL
ibm
GR
NPHI
FCNL
ILM
GR
NPHI
FCNL
GP
NPHI
fCNL
ILM
G~
NPH1
~CNL
ILM
GR
NPHi
~CNL
VA6
1
185
41
412
1
181
43
392
1
118
39
484
2
130
34
503
1
143
38
455
2
205
31
557
1
91
31
667
1
98
32
032
1
91
31
655
2
82
27
701
2
70
25
838
UE
.500
.748
.250
.836
.375
.213
.000
.874
.063
.063
.000
.625
.625
.277
.000
.u47
.625
.379
.750
.010
.750
.641
.000
.700
.500
.543
.000
.929
.438
.422
.000
.901
.750
.836
.500
.170
.500
.9{0
.000
.B01
.250
.098
.500
MNEMONIC
SFLU
RHOB
SFLU
GR
HHOB
GR
RHO~
8FLU
GR
RHOB
SFLU
GR
~H00
SFLU
GR
RHOB
SFLU
GR
RHOB
Sf'LU
GH
RHOB
SFLU
GR
RHOB
SFLU
GR
RHOB
SFLU
GR
RHOB
VALUI~
2.b27
185.375
2.375
3.002
188.250
2.457
2.b~3
139.500
2.412
3.057
135.625
2.463
1.540
1 '72.750
2.430
2.477
227.875
2.412
1.738
98.b88
2.424
2.1bO
106.500
2.428
2.025
96.500
2.389
2.242
102.125
2.395
3.23b
76.875
2.398
DEPIH
6700,000
6600.000
6500,000
6400.000
6300.000
6200,000
6100.000
6000.000
5900,000
5800.000
5700.000
MNEMONIC
SP
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NHAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
$P
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
VALUE
-41.000
95.250
13.484
2.662
-46.781
83.375
13.609
2.816
-42.875
108.250
14.375
3.170
-43.375
92.125
14,211
3.088
-44.000
91.125
14.445
3.281
-45.750
83.375
14.313
3.082
-40.125
7].625
14.195
3.207
-52.438
00.875
12.438
J.094
-45.344
05.313
13.281
3.004
-22.938
15.000
15.063
3.531
-40.938
65.438
14.109
3.139
EMONIC
iLD
DT
DRHO
NCNb
1LD
DRHO
NCNL
ILD
DT
DRHO
NCNb
1LD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
1LD
DT
DHHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
1LD
DT
DRHO
NCNb
iLD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
VALUE
3.561
90.56]
0.018
2428.000
6.~95
89.000
0.048
2666.000
3.215
95.375
0.018
2404.000
4.504
94.375
0.039
2378.000
2.830
98.56]
0.062
2262.000
3.654
91.375
0.072
2314.000
3.650
101.000
0.024
2270.000
3.822
96.563
0.024
2294.000
4.996
90.188
0.041
2320.000
2.492
105.563
0.132
1758.000
].166
101.188
0.095
1905.000
MN
EMONIC
GR
NPHI
fCNL
ILM
GR
NPHI
fCNL
1bM
GR
NPHI
f'CNL
GR
NPHI
~CNL
GR
fCNL
ILN
GR
NPHI
~CNL
IbM
GR
NPMI
FCNb
iLM
NPHI
fCNL
GR
NPHI
fCNL
ILM
GR
NPHI
~CNL
ILM
GR
NPHI
fCNL
VALUE
3.684
95.250
20.850
934.000
6.113
83.375
23.096
966.500
3.305
108.250
28.076
761.500
4.613
92.125
26.904
821.000
2.838
91.125
29.736
718.000
3.289
83.375
26.758
763.500
3.052
73.625
28.711
647.500
4.301
60.875
27.686
812.500
5.227
65.313
26.025
804.000
2,211
75.000
33.350
546.500
3.113
65.438
27.73q
569.000
MNEMONIC
SFLU
GR
RHOB
SFLU
GR
RHOB
6FbU
GR
RHOB
SFLU
GR
RHOB
SFbO
GR
RHOB
SFLU
GR
RHOB
SFLU
GR
RHOB
SFbU
GR
RHOB
GR
RHOB
SFLU
GR
RHOB
SFbU
GR
HHUD
VALUL
4.133
101.375
2.449
6.637
82.938
2.311
3.814
125.500
2.432
4.832
98.125
2.527
2.893
91.750
2.504
4.414
87.438
2.455
3.570
82.b88
2.346
3.732
60.469
2.285
5.398
74.063
2.482
1.479
84.188
2.438
4.012
U2.438
2.426
D,%PTi~
5600.000
5500,000
5qO0.000
5300.000
5200.000
5100.000
5000.000
4900.000
4800.000
4700.000
4600.000
MNEMONIC
SP
GR
CALl
NRAT
SP
CAb!
NRA[
GR
CALl
NRAT
SP
GR
CALI
NHAT
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
CAb!
NRAT
VALUE
-g5.750
45.056
12.422
3.135
-82.438
59.250
12.289
2.947
-85.938
]0.]75
12.391
2.842
-64.875
54.905
12.625
3.197
-75.875
45.500
12.438
].215
-104.438
38.938
12.570
3.379
-5;.875
46.938
13.109
3.361
-35.250
70.563
14.51b
3.652
-38.125
68.188
14.828
3.813
-45.094
80.000
15.297
3.66b
-92.875
49.894
12.b25
3.295
MNEMONIC
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
DT
DRHO
NCNb
ILD
DT
DRHO
NCNL
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
VALUE
1.555
103.188
O.OO5
2790.000
1.884
101.000
0.057
2438.000
1.647
i02.563
0.102
1987.000
2.434
99.375
0.059
2356.000
2.219
104.563
0.037
2246.000
1.662
108.000
0.016
2320.000
3.193
107.563
0.033
2408.000
3.213
117.188
0.074
1774.000
3.725
113.188
0.070
lg3b. O00
4.676
115.175
0.034
1753.000
2.039
130.000
0.018
2234.000
MN
EM(iN iC
GR
NPHI
fCNL
IbM
Ga
NPH1
fCNL,
1bM
NPHI
FCNL
NPH1
1bM
G~
NPHI
fCNL
ibm
NPHI
FCNL
GR
FCNL
ILM
GR
NPHI
fCNL
IbM
NPH1
FCNL
IbM
GR
NPHI
~CNL
ILM
GR
NPH1
~CNL
VALUE
1.901
45.656
28.271
849.500
2.260
59.250
25.586
852.000
2.018
36.375
23.975
704.000
2.887
54.906
29.150
76b.000
2.b37
45.500
29.541
723.000
1.934
38.938
31.982
696.000
3.289
46.938
31.494
704.500
3.109
70.563
35.400
508.250
3.646
68.188
37.744
498.750
4.473
80.000
35.303
501.000
2.102
49.844
30.604
658.500
MNEMONIC
S[~LU
GR
RHOB
SFLU
GR
RHOB
GR
RHOB
SFLO
GR
RHOB
SFLU
GR
RHOB
SFLU
GR
RHOB
SFLU
GR
RHOB
SFLU
GR
RHOB
GR
RHO0
SFLU
GR
RHOB
SFbU
GR
RHOB
VALU~
8.125
49.406
2.195
6.230
61.781
2.357
10.078
35.438
2.365
3.727
b4.375
2.344
5.859
53.719
2.299
5.055
43.719
2.152
3.814
57.344
2.242
2.832
79.b25
2.338
3.416
77.375
2.359
4.254
86.125
2.316
2.711
53.156
2.166
DEPTH
4500.000
4400.000
4300,000
4200.000
4100.000
4000.000
~qo0.000
3800.000
3700.000
{600.000
3500.000
MNEMONIC
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALk
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALI
NRAT
SP
GR
CArl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
G~
CALl
NRAT
SP
GR
CAhI
NRAT
VAL
-61
77
13
3
UE
.531
.438
.008
.412
-55.500
61.844
13.211
3.754
-52.
75.
13.
3.
-117.
27.
12.
3.
-52.
76.
14.
3.
-57.
70.
13.
3.
-87.
51.
12.
3.
-96.
51.
12.
3.
-62.
72.
13.
3.
-93.
49.
12.
3.
-59.
73.
14.
3.
875
563
297
674
813
703
172
197
188
063
484
869
344
125
227
740
438
594
461
723
688
656
359
561
094
438
266
615
250
906
430
773
375
813
367
662
MN
EMON1C
DT
DRHO
NCNL
ILD
DRHO
NCNL
ILD
DT
DRHO
NCNL
iLD
DT
DRHO
NCNL
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
iLD
DT
DRHO
NCNL
ILD
DT
DRHO
NCNL
DT
DRHO
NCNL
V.AbUE
7.063
116.563
0.044
1962.000
4.586
113.188
0.071
1927.000
5.b48
115.563
0.081
1966.000
3.357
114.188
0.039
2352.000
5.785
123.000
0.105
1624.000
6.945
118.000
0.042
1935.000
7.832
118.188
0.008
2188.000
6.605
131.125
-0.000
2180.000
9.258
119.563
0.030
1838.000
7.129
146.750
0.006
1931.000
4.617
121.563
0.068
1743.000
NPH1
PCNL
1LM
GH
NPHI
FCNL
NPHI
FCNL
IbM
GR
NPHi
~CNL
1LM
GR
NPHI
~CNL
G~
NPH1
~CNL
ibm
G~
NPHI
iLM
GR
NPHI
~CNL
ILM
NPHI
~CNL
NPHI
FCNL
IbM
NPHI
VAn
7
77
32
573
4
61
37
525
5
75
36
514
3
27
29
767
5
76
38
420
b
70
37
503
8
51
37
564
7
51
34
641
8
72
35
533
l
49
38
512
3
73
35
505
UE
.602
.438
.324
.500
.824
.844
.451
.500
.578
.563
.230
.000
.971
.703
.346
.000
.414
.063
.721
.000
.895
.125
.256
.250
.438
.594
.305
.000
.047
.65b
.863
.500
.953
.438
.303
.500
.523
.906
.086
.500
.943
.813
.59b
.000
MNEMONIC
SFLU
GR
RHOB
SFLU
GR
RHOB
SELU
GR
RHOO
SFLU
GR
RHOB
&FLU
GR
RHOB
SFLU
GR
RHOB
6FLU
GR
SFLU
GR
RHOB
SFLU
GR
RHO0
SFLU
GR
RHOB
SFhU
GR
VALUE
6.375
80.438
2.287
5.b05
77.063
2.328
4.65b
16.063
2.338
7.410
25.797
2.123
5.27O
82.250
2.355
6.512
72.063
2.328
8.398
56.188
2.154
8.188
48.156
2.139
9.039
75.125
2.307
8.289
53.281
2.115
3.447
eg.063
2.351
DEP2H
3400.000
{300,000
5200,000
3100.000
3000.000
2900.000
2800,000
2700.000
2650,000
MN~NUNIC
GR
CALl
NRAI
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
SP
GR
CALl
NBAT
SP
GR
CALl
NRAT
SP
GR
CALl
NRAT
VAL
-86
5O
13
-76
54
13
3
-73
73
14
3
-68
62
14
-99
46
13
3
-57
75
15
4
-5b
69
10
4
-70
53
14
4
-999
-999
-999
-999
UE
.375
.813
.367
.b58
.438
.813
.492
.703
.125
.375
.289
.47]
.500
.594
.563
.641
.000
.594
.367
.752
.313
.375
.367
.641
.375
.250
.578
.254
.875
.969
.992
.590
.250
.250
.250
.250
MN
EMONIC
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
ILD
DT
DRHU
NCNL
ll,D
DT
DRHO
NCNb
ILD
DT
DRHO
NCNb
VA
13
179
12
176
1
11
185
12
161
13
166
14
121
14
137
14
121
-99
-99
-99
-99
8.719
3.375
0.020
2.000
7.887
4.750
0.021
5.000
0.275
4.375
0.057
9.000
7.793
9.750
0.047
5.000
5.305
4.500
0.008
8.000
~.625
4.750
0.032
3.000
4.309
6.500
0.093
1.000
3.514
8.750
0.065
1.000
9.250
9.250
9.250
9.250
MNEMONIC
GA
NPHI
fCNL
ILM
GR
NPHI
fCNL
GR
NPHI
fCNL
IbM
GR
NPHI
~CNL
NPHI
FCNL
GH
fCNL
GR
NPH1
~CNL
NPHI
~CNL
NPHI
~CNL
VAb
9
50
35
515
8
54
36
485
10
73
32
519
7
62
35
44b
5
46
~7
410
4
75
5O
286
4
69
43
315
3
53
49
272
-999
-999
-99925
-999
UE
.0
.8
.9
.5
.0
.8
.5
.2
.3
.3
.7
.0
.6
.5
.2
.7
.2
.5
.4
.5
.5
.3
.1
.2
.1
.0
.6
.9
.5
.7
.2
.2
.0
.2
63
13
38
00
86
13
72
50
05
75
15
O0
52
94
05
50
70
94
02
O0
27
75
95
O0
17
50
99
O0
13
69
61
50
50
5O
O0
5O
NNILMON1C
SFLU
GR
RflOB
SFLU
GR
RHOB
SFLU
GR
RHOB
SFbU
OR
RHOB
8ebU
GR
RHOB
SFLU
GR
RHOB
5FLU
GR
RHOB
GR
RHO8
SFLU
GR
RHUB
VALUE
9.891
56.375
2.201
8.555
71.563
2.264
9.484
71.000
2.340
8.172
71.000
2.262
8.234
51.813
2.143
4.941
69.063
2.109
4.6i3
67.875
2.021
4.176
b5.500
2.023
-999.250
-999.250
-999.250
SUMMARY OF DAIA RECbRDS
NUMBER OF RECORDS: 974
LENGIH OF RECORDS: 966 BYTES
LENGTH OF LAST RECORD: 390 BYIES
FILE TRAILER
LENG1H: 62 BYTES
FILE NAME: EDiT .001
MAXIMUM PHYS1CAL RECORD LENGTH:
NEX~ ~ILE NAME:
1024 BYTES
TAP~ T~A1LER
6ENGTH: 132 BYTES
TAPE NAME: 60714 DATE: 80/ 8/28
SERVICE NAME: EDIT
TAPE CONTINUATION NUMBER: O!
NEXT ~APE NAME:
COMMENTS: UNIQUE WELL IDENTIFICATION NUMBER IS 50-029-20411