Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout180-002
~, t
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMIVlIsSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
FEB 2 8 2005
1 a. Well Status: 0 Oil 0 Gas D Plugged IBI Abandoned D Suspended D WAG 1 b. Well Class:
20AAC 25.105 20AAC 25.110 IBI/:I)evelopment "D'E;~plo~~\,~r:y 1;;':':';:"7'1
No. of Completions Zero Other D'Stråtigräphic Dsêrvicè'" ",." "
5.' Date Comp., Susp., or Aband. 12. Permit to DrillNu'l11ber
12/24/2004 180-002 304-480
6. Date Spudded a. f1'ñ ~ 3. API Number
2/2ØJæ'" /7 () v 50- 029-20431-00-00
7. Date T.D. Reached .fþI:tJ 14. Well Name and Number:
3/412Jd8ff /9&V PBU Y-06
8. KB Elevation (ft): 15. Field 1 Pool(s):
83.3' Prudhoe Bay Field 1 Prudhoe Bay
Pool
21. Logs Run:
OIL 1 SP / GR, BHCS 1 GR, FDC / CNL / GR / CAL, Cyberlook
CASING, LINER AND CEMENTING RECORD
SETTING QEPTH MD SETTING ,DEPTHTVD HOLE
I OP BOTTOM I OP ~OTrOM SIZE
Surface 110' Surface 110' 36"
Surface 2689' Surface 2689' 17-1/2"
Surface 10467' Surface 8722' 12-1/4"
9962' 11637' 8362' 9616' 8-1/2"
D GINJ 0 WINJ D WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1318' SNL, 5055' WEL, SEC. 34, T11N, R13E, UM
Top of Productive Horizon:
1738' NSL, 3401' WEL, SEC. 28, T11N, R13E, UM
Total Depth:
2217' NSL, 3692' WEL, SEC. 28, T11 N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 645039 y- 5948942 Zone- ASP4
TPI: x- 641349 y- 5951928 Zone- ASP4
Total Depth: x- 641048 y- 5952402 Zone- ASP4
-.._------------------- .-----------------------. ----------------------
18. Directional Survey 0 Yes IBI No
22.
CASING
Size
20" x 30"
13-3/8"
9-5/8"
7"
Wr.'PER,FT.
Insulated
72#
47#
29#
GRADE
Conductor
L-80
L-80
L-80
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
SCANNED MAR 0 2 2005
26.
Date First Production:
Not on Production
Date of Test Hours Tested
9. Plug Back Depth (MD+TVD)
11593 + 9581
10. Total Depth (MD+ TVD)
11643 + 9621
11. Depth where SSSV set
(Nipple) 2065' MD
19. Water depth, if offshore
N/A MSL
24.
SIZE
4-1/2", 12.6#, L-80
TVD
Ft
Ft
16. Property Designation:
ADL 028287
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
AMOUNT
PULLED
CEMENTING RECORD
12 cu yds Arcticset Concrete
3854 cu ft Permafrost
1518 cu ft Class 'G', 130 cu ft PF
460 cu ft Class 'G'
TUBING'RecORD
DEPTH SET (MD)
10019'
PACKER SET (MD)
9772' & 9912'
25. ACID, FRACTUAE,CEMENT SQUEEZE, ETC~
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10772' Set Whipstock
10772' P&A with 41 Bbls Class 'G'
10772' Set 2nd P&A Plug w/ 21 Bbls Class 'G'
ORtG'Nß,L
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
GAs-McF
W ATER-BBl
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
PRODUCTION FOR Oil -BBl
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + Oll-BBl
Press. 24-HoUR RATE
GAs-McF
W ATER-BBl
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
27.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
RBDMS BFL MAR 0 1 2005
G~ ,--
~ 1'"'"
NAME
I MD
10625'
10660'
10752'
TVD
29.
!.. Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
FORMATION TESTS
GEOLOGIC MARKERS
River
8836'
None
Sl1ubli~<
8861'
Ivishak
8929'
30. List of Attachments:
I
I
of
Wark and Daily Drilling Reports
31. i hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed
Terrie
Title Technical Assistant
Date
PBU Y -06
Well Number
180-002 304-480
Permit No.1 Approval No.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Ted Stagg, 564-4694
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
iTEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
iTEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
iTEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records tor this well should show the details of any multiple stage cementing and the location of the
cementing tool.
iTEM 23: if this well is completed tor separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 shollv the producing interJals for oniy the interval reported in item 26. (Submit a separate form tOt' each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
27: If no cores taken, incJicate "None".
ITEM 29: List all test information. It none, state "None".
Form .10-407 Revised 12/2003
Submit Original Only
Well:
Field:
API:
Permit:
Y -06A
Prudhoe Bay Unit
50-029-20431-01-00
204-251
Accept:
Spud:
Release:
Rig:
01/02/05
01/18/05
01/25/05
Nordic #2
PRE-RIG WORK
12/13/04
PULL 41/2" MCX ISSSV -1.125" BEAN - SN# M40B. DRIFT WI 3.60" X 20' 10" DUMMY WHIP STOCK 1 STOP
@ 3180', PICK UP WT 800 LBS, APPEARS TO BE SCHMOO. RDMO.
12/14/04
T/I/0=650/72010. INJECTING PW ON ARRIVAL. SCMOO-B-GONE TREATMENT (PRE CALIPER) - PUMPED
TUBING FROM TREE CAP, 5 BBl MEOH SPEAR, 175 BBLS SBG, 6 BBLS MEOH, SOAKED FOR 3 HRS.
PUMPED 120 BBLS 1% KCL OVER FLUSH, 10 BBLS MEOH. PAD OPERATOR TO PUT BACK ON INJECTION
AFTER 3 HR SOAK. FINAL WHP'S=0/40010.
12/21/04
DRIFT WI 3.60" X 20' 10" DUMMY WHIP STOCK 1 STOP @ 3324', PICK UP WT 900#, APPEARS TO BE
SCHMOO. DRIFT W/3.25 CENT TO 10,400', B&F TUBING W/4.5 BLB & 3.375 G.R. WHILE WELL ON INJ,
STANDBY FOR FL TO GET FREEZE PROTECTED.
12/22/04
LRS PUMPED 150 BBLS OF DIESEL/XYLENE, BRUSHED TUBING W/4.5 BLB & 3.625 G.R., LRS DISPLACED
DIESEL/XYLENE W/150 BBLS OF DIESEL. DRIFTED W/3.625 BAKER WIS TO 10,850' SLM (900# PU
WEIGHT), LOGGED TUBING WIPDS CALIPER.
12/23/04
LOGGED TUBING WIPDS CALIPER (GOOD DATA). SET BAKER WHIPSTOCK AT 10772' IN 7" CASING
FACING 3.37 DEGREES RIGHT OF HIGH SIDE LOOKING DOWN HOLE.
12/24/04
KILL WELL WITH 1%KCL AND RIH LOAD BS WITH DIESEL. TAG TOP OF WS AT 10782 CTMD. RESET
COUNTER TO ELMD. MIX AND PUMP 41 BBLS 15.8 PPG CEMENT. (5 BBLS NEAT, 30 BBLS WITH 10 PPG
AGGREGATE, 5 BBLS NEAT.) JOB IN PROGRESS.
12/25/04
HOLD SQUEEZE PRESSURE OF 800 PSI FOR 1 HOUR. ESTIMATE 10 BBLS CEMENT BEHOND PIPE.
RELEASE PRESSURE, DROP BALL AND CONTAMINATE TO WS TRAY. SWIVEL PROBLEMS. CIRCULATE
BOTTOMS UP. (THERE MAY BE A SMALL AMOUNT OF FILL ON TOP OF TRAY). REPLACE SWIVEL. POH
JETTING ALL JEWELRY AT 80%. FREEZE PROTECT WELL TO 2000 WITH 60/40 MEOH. TRAP 100 PSI ON
WELL. JOB COMPLETE.
12/27/04
BAILED FILL OUT OF WELL. RAN DRIFT 3.70 TO 9900 FT SLM.
12/28/04
DRIFT REACHED 9900' SLM AND RIGGED DOWN.
RIH TO SET IBP. IBP PARTIALLY SET AT 10185' MID-ELEMENT DEPTH. SLID UP HOLE TO 10152' MID-
ELEMENT BEFORE SHEARING OFF. POOH, RDMO.
12/29/04
RECOVERED IBP & SETTING TOOL. RECOVERED 1 RUBBER ELEMENT (POSSIBLE 1 ELEMENT DOWN BY
WHIPSTOCK ).
Y-06A, Summary of Work Pre CTD Sidetrack
Page 2
12/30/04
RECOVERED SMALL PIECE OF IBP ELEMENT (4" X 4"). ATTEMPTED TO SET STANDING VALVE I MIT-IA,
COULD NOT DUE TO SCALE BUiLD UP IN COLLARS. RETURN WELL TO PAD OP.
12/31/04
MIRU. MU 2.3" BDJSN AND RIH WHILE KILLING WELL W/1% KCL. UNDERBALANCE WELL WITH CRUDE,
RIH AND TAG WS AT 10,782 CTMD AND CORRECT TO 10772'. PUMP 21 BBLS 15.8 PPG CLASS "G"
CEMENT WHILE LAYING IN 1 :1. PUH TO SAFETY AND PERFORM HESITATION SQUEEZE. ACHIEVE 1120
PSI WHP. CLEAN OUT TO 10595' USING 98 BBL BIOZAN. CHASE OUT AT 80% JETTING TAILPIPE AND ALL
JEWERL Y.
BP
Operations Summary Report
Page 1 ..
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/2/2005
Spud Date: 1/5/2005
End: 1/15/2005
Date From - To Hours Task Code NPT Phase Description of Operations
12/31/2004 17:00 - 18:00 1.00 MOB P PRE Continue to rig down.
18:00 - 18:40 0.67 MOB P PRE Pre tour safety meeting with the night tour. Discuss plan ahead
for the evening. Hold PJSM for moving off well.
18:40 - 20:00 1.33 MOB P PRE Prep to move off well.
20:00 - 20:20 0.33 MOB P PRE Move Nordic 2 of of well L 1-01, and stage in the middle of L 1
pad.
20:20 - 21 :45 1.42 MOB P PRE Prep to lay down derrick and wind walls.
21 :45 - 22:05 0.33 MOB P PRE Safety meeting Re: laying down derrick.
22:05 - 00:00 1.92 MOB P PRE Scope in windwalls. Lay derrick down.
1/1/2005 00:00 - 00:45 0.75 MOB P PRE Continue to lay down derrick.
00:45 - 01:10 0.42 MOB P PRE Hole PJSM with Toolpusher, Wellsite leader, security and rig
hands prior to starting move.
01:10 - 06:00 4.83 MOB P PRE Move Nordic 2 from L 1 pad headed toward Y pad on the WOA.
06:00 - 15:00 9.00 MOB P PRE Continue move. Arrive on H-pad at 1500 hrs.
15:00 - 18:00 3.00 MOB P PRE Raise derrick and re-string blocks prior to moving onto Y -pad.
18:00 - 19:00 1.00 MOB P PRE Crew change and PJSM to discuss finish raising the derrick,
and restringing drilling line.
19:00 - 22:30 3.50 MOB P PRE Move injector out of the way. Hang blocks. Restring drilling
line.
22:30 - 00:00 1 .50 MOB N PRE Ready to move again. Security now escorting Nabors 4ES on
a rig move, so are unavailable. Wait on security to arrive.
1/2/2005 00:00 - 00: 15 0.25 MOB P PRE Continue to standby waiting for security.
00: 15 - 00:30 0.25 MOB P PRE Safety meeting with security and rig crew prior to moving from
H to Y pads.
00:30 - 02:40 2.17 MOB P PRE Move Nordic 2 from H to Y pad.
02:40 - 15:00 12.33 MOB N WAIT PRE Waiting on Y pad for pad preparation to be completed. Needed
80yds of gravel to level out.
15:00 - 15:20 0.33 MOB P PRE Hold PJSM and review move onto well.!
15:20 - 17:00 1.67 MOB P PRE Set cellar mats. Dig out fill in cellar to access OA valves.
17:00 - 18:00 1.00 MOB P PRE Move over well. rig accepted at 1700 hrs. 1-2-2005
18:00 - 18:30 0.50 RIGU P PRE Crew changeout and Pretour safety meeting with rig hands,
valve crew, and cameron hands. Discussed the plan forward
for tonight, hazards and mitigation to hazards.
18:30 - 23:15 4.75 RIGU P PRE Check pressure on tree. Found 90 psi. Bleed off pressure to
bleed trailor. Got pressure down to 20 psi. Attempt to set
TWC. Hanging up in the Swab valve. Steam swab to melt ice.
Still can't get TWC thru it. Visual examination shows swab
appears to be damaged and sticking into bore 1/4". With shut
master valve, ND 7" quick union and swab valve. NU 7" union
IN to top of flow cross.
23:15 - 00:00 0.75 RIGU WAIT PRE Valve crew had to run over and pull a TWC at Nabors 9ES.
I Stand by on valve crew.
IN I
1/3/2005 00:00 - 00: 15 0.25 RIGU ¡WAIT PRE Continue to wait on valve crew to set TWC. Bled tubing
I I pressure to 0 psi while we wait.
00:15 - 01 :00 0.75 RIGU !P ! PRE I Valve crew back on location. Set TWC.
01 :00 - 05:00 4.00 RIGU ip PRE . Bleed lAP to 0 psi. Cycle lower lockdown screws. Nipple down
! i production tree.
05:00 - 06:00 1.00 RIGU Ip PRE I Clean furmanite material from void space around upper lock
I I down screws. Cycle upper lock down screws.
06:00 - 06: 15 0.25 BOPSU9P PRE I PJSM meeting with oncoming crews. review plan forward.
06:15 - 15:30 : 9.25 BOPSUF1 P ISFAL PRE I NU 13-5/8" BOP's. Notify AOGCC rep of pending test.
15:30 - 16:30 1.00 BOPSURN PRE Make a full body test. Annular not holding, function several
I
I
Printed: 1/31/2005 8:02:45 AM
Page 2 8J
BP
Operations Summary. Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-06
V-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Date
Start:
Rig Release:
Rig Number:
Spud Date: 1/5/2005
End: 1/15/2005
1/2/2005
113/2005
1.00 BOPSUP N
From - To Hours Task Code NPT Phase
SFAL PRE
15:30 - 16:30
16:30 - 18:00
1.50 BOPSUP N
18:00 - 22:30 4.50 BOPSUR N
22:30 - 00:00 1.50 BOPSUR N
1/4/2005 00:00 - 04:15 4.25 BOPSUP N
04:15 - 09:15 5.00 BoPsur; P
09:15 - 12:15 3.00 EVAL P
12:15 - 13:15 1.00 EVAL P
13:15 - 14:45 1.50 PULL P
14:45 - 15:00 0.25 PULL P
15:00 - 15:50 0.83 PULL P
15:50 - 16:15 0.42 PULL P
16:15 -19:30 3.25 PULL N
19:30 - 20:00 0.50 PULL P
20:00 - 22:30 2.50 PULL P
22:30 - 00:00 1.50 PULL P
1/5/2005 I 1.00 PULL P
100:00 - 01 :00
i 01 :00 - 02:00 1.00 PULL N
i 02:00 - 02:20 0.33 PULL P
102:20 - 03:15 0.92 PULL P
103:15 - 04:30 1.25 PULL P
I
I Ip
i
104:30 - 05:30 1.00 PULL
I i
Description of Operations
times. Take accumulator up to 1500psi but conitnues to leak
badly.
Remove test jt make visual inspection of element. Annular bag
is damaged and needs to be replaced. No spare element is
available. Arrange to get 13-5/8" annular from Nordic 3.
Contact Shane at Nordic 3, arrange trucking. Standing by on
new bag.
Remove defective 13-5/8" annular while waiting on new bag
from Kuparuk.
Nipple up new 13-5/8" stack.
Continue to NU replacement 13-5/8" annular. Nipple up riser.
Check the choke and kill lines. Air up boot on riser.
Perform initial BOP test for 13-5/8" BOP's. Test good. Continue
testing 250psi low / 350psi high. AOGCC waived witnessing
test.
DECOMP R/U lines to test IAffbg. PU 24' of 7" lubricator. Pull TWC with
DSM lubricator. RD our 7" lubricator.
DECOMP Pressure up tubing to 2000 psi. Pressure test IA to 4000 psi.
Hold for 1/2 hour and chart.
InitiallA pressure = 4000 psi
15 min IA pressure = 3959 psi
30 min IA pressure = 3933 psi
Good MIT test. Bleed down IA followed by the tubing, rig down
testing equipemnt.
DECOMP Back out lockdowns. Rig up 5" DP to pull tubing.
DECOMP Safety meeting prior to pulling on tubing.
DECOMP Check IA. It has a small amount of pressure. Bleed off to
bleed trailer.
DECOMP Pick up on tubing string. Unseated tubing hanger at 95 klbs.
Pick up in 20 klb increments to 230 klbs. 15' of stretch. Did
not release from PBR. Slack off weight and cycle back up to
230 klbs 4 more times. No movement. Unable to pull from
PBR. Need to chemical cut.
WAIT DECOMP Call for slickline unit for drift and tag. Notify Schlumberger to
have chemical cutter BHA ready.
DECOMP Hold PJSM with SLB s-line and rig crews. Discuss pressure
control equipment rig up.
DECOMP Spot SLB slick line unit. RU s-line sheaves & tools. MU 3.75"
od drift. Would not pass XO on landing joint. Discuss
downsizing chemical cutter with SLB e-liners. MU 3.5" gauge
ring. Drift to 9950' SLM.
DECOMP Re-spot SLB slick line unit to improve rig up. Discuss
downsizing chemical cutter with SLB e-liners. MU 3.5" gauge
ring. Drift to 9950' SLM. POOH.
DECOMP I Rig down SLB slick line unit & equipment.
WAIT DECOMP ¡Wait on SLB e-line crew, delayed by rig move in progress on
I Spine Rd.
DECaMP I Hold PJSM with SLB & rig crews before beginning rig up.
DECOMP Rig up SLB e-line equipment.
DECOMP Run in hole with tbg punch & CCL. Log tie in pass. Perf tbg
from 9813 to 9815.
¡ I. Well flowing from tbg, u-tubing with IA fluids.
I DECOMP POOH with e-line tools.
I
i
SFAL PRE
RREP PRE
RREP PRE
RREP PRE
PRE
Printed: 1/31/2005 8:02:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
BP
Operations Summary Report
Page 38)
V-DB
Y-06
WORKOVER
NORDIC CAliSTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/2/2005
Spud Date: 1/5/2005
End: 1/15/2005
Date From - To Hours Task Code NPT Phase Description of Operations
1/5/2005 05:30 - 08:15 2.75 PULL P DECOMP Lay down tubing puncher. All shots fired properly. PU string
shot and RIH. Fire string shot 9846'-9859'. Good indication of
fire, POOH.
08: 15 - 08:35 0.33 PULL P DECOMP Safety meeting Re: chemical cutter. Discussed hazards and
techniques to mitigate hazards.
08:35 - 09:10 0.58 PULL P DECOMP Rig up chemical cutter. Rig floor clear of non essential
personnel.
09:10- 12:00 2.83 PULL P DECOMP RIH with 3.375" chemical cutter. Make full tie in pass over
jewalry. Position CC head in middle of full joint below SS, at
9858' ELM. Fire chemical cutter. Good indication of fire from
wire line unit and on rig floor. POOH with chemical cutter. Ref
log for all eline runs was the Camco Jewalry log of 12-09-90.
There is 14' difference between ELM and Drillers depths.
Chemical cut with ref to drillers depth is 9872'.
There should be 17' of stub sticking up from above the PBR,
and 14.4' of stub below the SS.
12:00 - 17:00 5.00 PULL P DECOMP Circulate down the IA recovering the diesel freeze protect.
Then swap to circulate down the tubing taking returns from the
IA. Taking the crude to the tiger tank. Circulate 1150 bbls of
hot seawater. Tubing + IA vol = 680 bbls. The last 300 bbls of
returns were pretty clean.
17:00 - 18:00 1.00 PULL P DECOMP Pull tubing hanger to the floor. Rig up to recovering control line
onto spooler. Begin pulling tubing.
18:00 -18:30 0.50 PULL P DECOMP Hold PJSMfTL mtg with rig crew & service hands. Discuss
handling jointed pipe, spill prevention, job assignments.
18:30 - 00:00 5.50 PULL P DECOMP Pull and lay down tubing. Stuff absorb into joint ends to
prevent possible spill of well bore fluids. Control lines and
stainless cable pulling ok, but plastic coating is shredded and
coming off in pieces. Recovered 26 rubber and 6 stainless
control line bands/centralizers (none lost in hole).
1/6/2005 00:00 - 02:30 2.50 PULL P DECOMP Run and set Howco 9-5/8" RTTS at 35' below floor. Test same
to 1000 psi from top. Release from packer and stand back drill
pipe.
02:30 - 02:45 0.25 BOPSUP P DECOMP Hold PJSM with rig crew before begining ND procedure.
Discuss rig up for lifting BOPs, and removing tubing spool with
loader etc.
02:45 - 06:00 3.25 BOPSUF P DECOMP ND and remove riser. Loosen bolts on tbg spool, upper &
lower.
06:00 - 06:50 0.83 BOPSURP DECOMP Crew change and PJSM re: lifting 13-5/8" stack, double
securing stack, changing tubing hanger and 9-5/8" packoff.
06:50 - 10:30 3.67 BOPSUR P DECOMP Disconnect hydraulic hoses from stack. Pump into OA to
confirm we have good communication to OA. Bleed OA to 0
psi. Pull stack with blocks and secure in cellar with additional
I secondary sling. Pull tubing hanger spool.
I
10:30 - 14:00 3.50 BOPSU~ P DECOMP i Replace 9-5/8" casing packoffs.
14:00 - 17:30 3.50 BOPSURN WAIT DECOMP i The lower plate for the 9-5/8" packoff can not be removed.
! 1 There are also 10 broken cap screws. To get a new packoff
I assembly installed the broken cap screws must be removed, or
Iwe must pull the 9-5/S" slips. The Cameron hands suggest
spearing the 9-5/8" casing, pulling and changing the slips. This
I will require more pull than the Nordic 2 derrick can provide.
I
I
Printed: 1/31/2005 8:02:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Page 4"
BP
Operations. Summary Report
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/2/2005
Spud Date: 1/5/2005
End: 1/15/2005
Date
From - To Hours Task Code NPT Phase
Description of Operations
1/6/2005
14:00 - 17:30
17:30 - 19:00
19:00 - 21 :00
3.50 BOPSUP N
1.50 BOPSUP N
2.00 BOPSUP N
21 :00 - 00:00 3.00 BOPSUP N
1/7/2005 00:00 - 01 :30 1.50 BOPSUF P
01 :30 - 02:30 1.00 BOPSUP P
02:30 - 06:00 3.50 BOPSUF P
06:00 - 06:45 0.75 BOPSUPP
06:45 - 09:45 3.00 BOPSUR P
09:45 - 10:10 0.42 BOPSUP P
10: 10 - 10:25 0.25 BOPSUP P
10:25 - 12:00 1.58 BOPSUP P
12:00 - 13:00 1.00 BOPSUF-P
13:00 - 13:10 0.17 PULL P
13:10 -15:30 2.33 PULL P
15:30 - 15:45 0.25 PULL P
15:45 - 16:30 0.75 PULL P
16:30 - 18:00
18:00 - 21 :00
21 :00 - 23:00
1/8/2005
23:00 - 00:00
00:00 - 03:15
03:15 - 03:45
03:45 - 06:00
06:00 - 08:00
08:00 - 08:40
1.50 PULL
3.00 PULL
2.00 PULL
1.00 PULL
3.25 PULL
0.50 RUNCOJp
I
I
2.25 RUNCO~
2.00 RUNCOW
I
I
!
I
0.67 RUNCOIVP
I
I
I
WAIT DECOMP Call town and discuss plan forward.
WAIT DECOMP After discussion with town the plan is to attempt to fabricate a
pulling tool similar to a gear puller, and thread the lower packoff
plate and attempt to pull it. Send the Cameron hands to round
up the parts to do this.
DECOMP Tap 2 holes in each lower c-plate. Rig a simple puller using
3/4" all thread, nuts, and washers. Pull c-plates free from
casing head. Dress 3 dutchman protruding from 9-5/8" slip
assembly.
DECOMP Install new lower 9-5/8" pack-off assembly. Energize same
with lock down screws. Install new upper 9-5/8" packoff. NU
new tubing head. Activate upper pack off with graphite sealant.
DECOMP Continue to NU tbg spool. Inject packoff graphite sealant.
Test packoffs & flange to 3500 psi for 15 min. Test good.
NU 13-5/8" BOPs to tbg spool. Attach hydraulic lines.
NU riser between floor and BOPs.
PJSM re: plan forward for today.
Finish nippling up riser, set test plug. Body test BOP stack 5
minutes low and high pressure. All passed ok.
Pull test plug.
Safety meeting re: Pulling RTTS.
Pull RTTS and lay down.
Rig up hose to top of 4-1/2" completion and circulate to warm
well. Pump at 5 bpm. Got more of the rubber coating from the
control line out of the hole during this circulation.
DECOMP Toolbox talk on tripping tubing OOH.
DECOMP Pull old tubing string OOH. Got 40 jts and 1 GLM OOH.
DECOMP Hold PJSM re: Crane lifts. Need to pull HES control line
spooler off of rig floor. Need to pick up Nabors casing crew
, tongs.
DECOMP I Make crane lifts.
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
P
P
Note - If we had a jib crane on the rig floor these lifts could
have been made off of the critial path, which would have saved
2 hours of rig time. It also would have been unnecessary to
use a rental crane from Peak in Deadhorse.
DECOMP Resume pulling old tubing string OOH.
DECOMP Continue to POOH with old completion, after rig crew change
out. Approx. 180 jts to go.
DECOMP I Foot throttle failed on draworks. Call for rig electrician. Repair
throttle.
DECOMP Continue to pull 4-1/2" completion.
DECOMP Continue to POOH with 4-1/2" completion. Chemical cut looks
very good. 100% cut. Stub is round.
RUNCMP Hold PJSM with SLB slick line crew. Spot unit to allow acess
to pipe shed.
RUNCMP Run 8.5" gauge ring / junk basket on slickline.
RUNCMP Continue RIH. Basket falling slowly. SL operator says it looks
as if he is pushing something. Hole deviation is only 45 deg.
Basket should fall cleanly. Tag tubing stub at 9856' SLM.
(ELM cut depth was 9858') POOH slow. Swabbing on way
: OOH, so have to pull slow.
RUNCMP i Dump junk basket. Basket is full of what looks like chunks of
N
I
P
P
RREP
Printed: 1/31/2005 8:02:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Page 5.
BP
Operations Summary .Report
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
1/8/2005
08:00 - 08:40
From - To Hours Task Code NPT Phase
0.67 RUNCOrvP
RUNCMP
Date
08:40 - 12:45
12:45 - 13:00
13:00 - 16:45
16:45 - 17:00
17:00 - 17:15
17:15 - 17:35
4.08 RUNCOtvP
RUNCMP
0.25 RUNCOtvP
RUNCMP
3.75 RUNCOtvP
RUNCMP
0.25 RUNCOrvP
RUNCMP
0.25 RUNCOtvP
RUNCMP
0.33 RUNCOM\J
WAIT RUNCMP
17:35 - 00:00 6.42 RUNCOM\J WAIT RUNCMP
1/9/2005 00:00 - 06:00 6.00 RUNCOM\J WAIT RUNCMP
06:00 - 15:00 9.00 RUNCOM\J WAIT RUNCMP
15:00 - 00:00 9.00 RUNCONN WAIT RUNCMP
1/10/2005
00:00 - 03:30
03:30 - 03:45
I
I
3.50 RUNCO~
0.25 RUNCOM\J
I
i
I
I
I
I
I
WAIT RUNCMP
WAIT RUNCMP
Start:
Rig Release:
Rig Number:
Spud Date: 1/5/2005
End: 1/15/2005
1/2/2005
Description of Operations
control line rubber, parafin, and particulate matter like sand.
90% of debris appeared to be control line rubber. Top half of
basket packed full. Got about 1.5 gallons in a 5 gallon bucket
of debris on this run. Clean out junk basket, and rig up to
rerun.
Rerun junk basket gauge ring. Made it to 9944' (?) slickline
measured depth on this run.
Back at surface. Junk basket full of debris again. Got slightly
more debris than last time. Debris consisted of a few big
chunks of rubber about 6" long, and lots of fine broken up
pieces. Still about 2 gallons in volume.
Make 3rd guage ring/junk basket run. Tag up at same depth,
9944' SLM. Hard tag. POOH.
We were just notified that the weather conditions are now
phase 3. We will continue coming OOH with the junk basket,
get to surface, secure the well and dry watch the rig. Continue
to POOH.
Tag up at surface. Dump junk basket. Got more than last
time. About 2+ gallons of debris. A few big pieces of rubber
and lots of fine particulate rubber. Leave slickline rigged up.
Tie back junk basket.
Hold safety meeting Re: phase 3 weather conditions. We have
17 Souls on location. We have the rig crew, 3 slickline hands,
3 service coil hands from a service unit on Y -10. Discuss the
BP protocol for phase 3 weather. No work is to be done except
what is needed to keep the rig warm and lit. 2 hands must
drywatch the rig at all times. All outside travel must be in
parties of 2 or greater with at least 1 radio. The other hands
are welcome to bunk in the tech limits camp. We have plenty
of diesel and rig water. The weather conditions are expected to
be phase 3 thru Sunday night.
Standby on phase 3 weather.
Continue to wait on Phase 3 weather. Fuel and rig water levels
ok.
Continue to wait on weather. Temp -11, winds 37 gusting 42,
windchill -60. Outlook for tonight blizzard conditions, winds to
55 mph.
The generator on the Schlumberger slickline unit failed. The
crew at location is unable to get it repaired, even with the
assistance of the rig motor man. The SLB mechanic in
Deadhorse does not want to attempt further field repairs. The
slickline unit will not be available to use when the weather
moderates. We will have to get another unit to finish our
cleanout. Continue to wait on weather. Current winds 36-44
I mph, temp=-16 degf, windchill=-76 degf.
I
! Continue to standby waiting on weather.
I
I
I
II Continue to standby. Weather conditions Phase 3.
Convoy arrived with Nordic crew. Change Nordic crews. Send
II SLB service coil and slick line crews off location, to BOC. Rig
SLB crews no changeout since Saturday morning.
I
I
Printed: 1/31/2005 8:02:45 AM
BP
Operations Summary Report
Page 6<8'
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/2/2005
Spud Date: 1/5/2005
End: 1/15/2005
Date From - To Hours Task Code NPT Phase Description of Operations
1/1 0/2005 03:45 - 06:00 2.25 RUNCOrvN WAIT RUNCMP Continue to wait on Phase 3 weather. Winds at 28 mph,
gusting to 40 mph. Temp -22 deg f.
06:00 - 15:15 9.25 RUNCOIVN WAIT RUNCMP Continue to wait on Phase 3 weather. Current winds 24 mph
gusting to 30 mph. Temp -22, Wind chill = -75 deg. Forcast is
for winter storm warnings until 6 PM today with winds 20-30
mph, temperatures to -30, wind chills in excess of -60 degf.
Discussed phase 3 protocol with new Nordic crew. Dry watch
the rig. No unneccessary work to per performed. Only do
tasks needed to keep the rig warm and the lights on. Rotate
the crew members so that they can get sleep, with 1 SLB and 1
Nordic hand on duty at all times. Current head count is 10
souls on the rig.
Continue to wait on weather.
15:15 - 15:30 0.25 RUNCOrvN WAIT RUNCMP Convoy to rig with potable water and sewage truck. Extra rig
team members head to BOC with return convoy. Continue to
wait on weather.
15:30 - 20:00 4.50 RUNCOrvN WAIT RUNCMP Continue to wait on Phase 3 weather. Call AOGCC to discuss
BOP test. Extension granted by J. Spaulding to run completion
before weekly test.
20:00 - 20:30 0.50 RUNCOrvN WAIT RUNCMP Convoy from Dead horse arrives to change out SLB CTD crew.
Continue in Phase 3 weather.
20:30 - 00:00 3.50 RUNCOM\l WAIT RUNCMP Continue to dry watch rig. Still in Phase 3 conditions. Weather
slowly improving.
1/11/2005 00:00 - 05:45 5.75 RUNCOrvN WAIT RUNCMP Continue to wait on Phase 3 weather.
05:45 - 06:00 0.25 RUNCOrvN WAIT RUNCMP Discuss weather restrictions with IMT. Phase 2 on main roads,
phase 3 on small access roads. Well site leader discretion to
assess acessability to location. Hold PJSM with rig team &
loader operator. Plan to use 3 vehicle convoy to evaluate
access to GC-2.
06:00 - 08:30 2.50 RUNCOIVN WAIT RUNCMP Wait on Phase 3 weather.
08:30 - 09:45 1.25 RUNCOrvN WAIT RUNCMP Convoy out to GC2 to evalute access to V-Pad. Road
passable for pick ups only.
09:45 - 10:00 0.25 RUNCOW RUNCMP Hold PJSM with rig crew to discuss loading pipe shed with
completion. Heavy equipment widened access path to pad
using snow blower.
10:00 - 15:00 5.00 RUNCOt\,p RUNCMP Continue to load pipe shed with 4-1/2" tbg.
Arrange for SLB crew change.
Call for SLB slick line mechanics & crews to convoy to location
to repair slickline unit.
15:00 - 17:00 2.00 RUNCOW RUNCMP RU SLB slick line unit. Run 8.5" drift with junk basket
17:00 - 18:30 1.50 RUNCONf\J DPRB RUNCMP Unable to get slickline through well head. Suspect ice plug.
I Run steam hose into well. Put Tioga heater on cellar for
! additional heat.
18:30 - 19:00 0.50 RUNCOryp RUNCMP Crew change on location. Change out and hold on Tour TL
and PJSM mtg for night ops.
Phz 2/3
19:00 - 22:00 3.00 RUNCOW RUNCMP Pull steam hose from well head. RIH with GRljunk basket. No
I obstruction. RIH to 9858' WLM. Recovered 2-1/2 gallons of
112 plastic control line coating and MI mung
22:00 - 00:00 2.00 RUNCO~P RUNCMP Run 8.5" GRlJB again to 9858' WLM
1 112/2005 00:00 - 01 :00 1.00 RUNCOr RUNCMP POOH wI GRlJB and no recovery
Printed: 1/31/2005 8:02:45 AM
Page 7 CIÞ
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Date From - To Hours Task Code NPT Phase
1 Ii 2/2005 01 :00 - 02:30 1.50 RUNCOfvP RUNCMP
02:30 - 04:30 2.00 RUNCOM\J WAIT RUNCMP
04:30 - 06:00 1.50 RUNCOfvP RUNCMP
06:00 - 06:45 0.75 RUNCOrvP RUNCMP
06:45 - 07:00 0.25 RUNCOr-,If> RUNCMP
07:00 - 09:00 2.00 RUNCOfvP RUNCMP
09:00 - 09: 15 0.25 RUNCOfvP RUNCMP
09:15 - 10:30 1.25 RUNCOfvP RUNCMP
10:30 - 14:00 3.50 RUNCOIVP RUNCMP
14:00 - 18:00 4.00 RUNCOIVP RUNCMP
18:00-18:15 0.25 RUNCOrvIP RUNCMP
18:15 - 22:20 4.08 RUNCOIVP RUNCMP
22:20 - 23:30 1.17 RUNCOW RUNCMP
1 Ii 3/2005
23:30 - 00:00
00:00 - 00:40
00:40 - 01 :30
SFAL RUNCMP
SFAL RUNCMP
RUNCMP
0.50 RUNCOM\J
0.67 RUNCOM\J
0.83 RUNCOrvP
01 :30 - 04:15
2.75 RUNCOfvP
RUNCMP
04:15 - 06:30
2.25 RUNCOr
i
I
0.25 RUNCOW
0.50 RUNCOt<IP
0.75 RUNC01\ìP
I
!
RUNCMP
RUNCMP
RUNCMP
RUNCMP
06:30 - 06:45
06:45 - 07: 15
07:15 - 08:00
08:00 - 08:30
08:30 - 09:30
I
0.50 RUNCOrvP
1.00 RUNCO~
I
I
RUNCMP
RUNCMP
Start:
Rig Release:
Rig Number:
Spud Date: 1/5/2005
End: 1/15/2005
1/2/2005
Description of Operations
RIH wi 4.5" LIB to 9858' and no marks
WO pump bailer
Wind is down to 10-15 mph, still Phz 2/3
RIH wi 3" x 10' pump bailer
Phz 1/2.
Out of hole with bailer. Recovered 1/2 bailer of MI mung and
had clear impact marks on bottom of bailer indicating contact
with tbg stub (we think).
RD SLB slick line.
Hold PJSM & TL mtg in dog house with rig crews. Discuss
plan forward.
Rig up floor to run 4-1/2" TCII completion.
Hold PJSM with Nabors, Nordic, SLB, Baker hands to discuss
assignments, hazards, procedures for running completion.
MU tail pipe over shot, x nipple & packer assembly. Baker lock
connections below packer.
Torque turn 4-1/2" TCII tubing. First 12-15 jts hanging up in
wellhead. Suspect TCII collars hitting some thing. Problem
went away as string weight increased. 85 joint in hole at 1400
hrs.
Continue to RIH with completion to jt #143
Safety mtg re: TUcrew changelrun tubing
Phz 1/2
Torque turn 4-1/2" 12.6# L-80 TC11 R-3 tubing to jt #233
Pickup 2 extra jts and RIH washing thru overshot at 2.0/40 and
pressure increased by 200 psi before getting to shear pins (at
2.6' in). SD pump and stack wt on shear pins until sheared at
-6k. RIH 6.5' until set down of OS bottoming out. PU 2' and
circ 1.5/350 psi, but acts like fill
Rig up to reverse and found cellar lines frozen. Thaw
Fin thaw cellar lines
Close annular and begin rev circ corr inhib SWat 2.75/225 with
OS above stub. Wash down to just over top of tubing stub and
pressure increased and packed off. Assume more control line
rubber (after 50 bbls of returns had recovered one chunk of CL
rubber 1.8' long from tubing). Will have to reverse in SW and
diesel with OS above stub and hanger below annular before
landing hanger
LD 3 jts. Add spacer pups. Add a jt. Install hanger. RU
landing jt on XO's and circ head. RIH 23' to put hanger below
annular and OS about 2' above stub. Close bag
Note: ran 232 jts 4-1/2" tubing
Reverse in thru kill line wi 400 bbls SW wi corrosion inhibitor at
2.75/230 (pump rate limited by packer specs). After one tubing
volume surface lines started packing off with control line rubber
and also got MI mung water back
Hold PJSM with Little Red.
RU pump truck to IA valve in cellar. Pressure test same.
Pump 120 bbls warm diesel down IA to freeze protect same.
2.5 bpm @ 300-450 psi.
Shut in IA. RD Little Red.
Land tubing. Depth díscrepency noted on landing joint.
Re-evaluate the numbers. Believe we are landed correctly. IA
Printed: 1/31/2005 8:02:45 AM
Page 8-
BP
Operations Sum maryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Date From - To Hours Task Code NPT Phase
1/13/2005 08:30 - 09:30 1.00 RUNCOtvP RUNCMP
09:30 - 09:45 0.25 RUNCOtvP RUNCMP
09:45 - 10:45 1.00 RUNCOtvP RUNCMP
10:45 - 11 :45 1.00 RUNCOrvP RUNCMP
11 :45 - 14:30 2.75 RUNCOtvP RUNCMP
14:30 - 23:00 8.50 RUNCOrvP RUNCMP
23:00 - 00:00 1.00 RUNCOfv'N DFAL RUNCMP
1/14/2005
00:00 - 00:30
: 00:30 - 04:00
0.50 RUNCOfv'N
3.50 RUNCOfv'N
DFAL RUNCMP
DFAL RUNCMP
04:00 - 05:45 1.75 RUNCOrvP RUNCMP
05:45 - 06:45 1.00 RUNCOtvP RUNCMP
06:45 - 07:30 0.75 RUNCOrvP RUNCMP
07:30 - 08:15 0.75 RUNCOtvP RUNCMP
08:15 - 11 :00 2.75 RUNCOrvP RUNCMP
11 :00 - 13:00 2.00 RUNCOr-.,p RUNCMP
13:00 - 13:30 0.50 RUNCOrvP RUNCMP
13:30 - 14:00 0.50 WHSUR P RUNCMP
14:00 - 14:15 0.25 WHSUR P RUNCMP
14:15 -15:15 1.00 WHSUR P RUNCMP
15:15 - 22:15 7.00 WHSUR P RUNCMP
22:15 - 22:30 I 0.25 WHSUR P RUNCMP
22:30 - 00:00 1.50 WHSUR P RUNCMP
1/15/2005 00:00 - 00: 15 0.25 WHSUR P RUNCMP
00:15 - 02:30 2.25 WHSUR P RUNCMP
02:30 - 02:50 0.33 WHSUR P RUNCMP
02:50 - 06:00 3.17 WHSUR P RUNCMP
Start:
Rig Release:
Rig Number:
1/2/2005
Spud Date: 1/5/2005
End: 1/15/2005
Description of Operations
holding pressure. RILDS.
Hold PJSM with SLB slick line & rig crews. Discuss job,
hazards, comms, safe area and more.
RU SLB slick line unit with 0.125" wire.
RIH and recover RHC plug from 9782'.
RIH with 3.77" and drift to 10,000' (original tubing tail). POOH
RIH and set equalizing plug in X nipple at 9795' WLM. POOH
and still had plug. Change shear pin and rerun. Slow runs due
to wellbore full of fluid and tight tolerance of plug
RU landing jt wi circ head. lAP 250 psi. Bleed off approx 2
bbls diesel to cuttings box until no returns. Leave IA valve
open and pressure tubing to set packer. Got to 700 psi wi 1.4
bbls and had a good diesel flow from IA. SO pump and
monitor as pressure bled off on tubing-plug is leaking. SI IA
valve after tubing pressure was bled off and imbalance
continued to flow diesel
RD landing jt wi circ head. RU WL
RIH wi equalizing prong and knock watermelon off seat
RIH wi pulling tool and recover 'X' plug. Packing looked new
and no marks on tool. Assume watermelon may have not
seated when tool was set
RIH wi 'X' RHC plug and set in nipple at 9782'
Stand back DP landinglpump in assembly. MU 1 jt TCII. Drop
ball & rod assembly. Remove TCII. MU drill pipe landing joint.
Open IA. Pressure tbg to 4000 psi to set pkr & test tbg.
Record same for 30 min. Test good.
Bleed tbg to 1500 psi. Pressure IA to 4000 psi. Record for 30
min. Good test.
RIH with slick line to recover ball & rod from RHC plug. POOH.
RIH. Recover RHC plug assembly. POOH. Begin cleaning
hauling off fluids. Clean pits.
RD SLB slickline unit.
Set two way check valve in tbg hanger.
Hold PJSM to discuss crane picks from rig floor with crew and
operator.
Use crane to lift Nabors power tongs, thread protector bags,
other. Break down landing joint on floor. Round up other misc
equipment to ship out.
NO 13-5/8" BOPS and load out
Safety mtg re: where to set 7" BOP's to be out of the way of 7"
tree
i Hang 7" BOP's 180 deg out on hook in cellar
Fin set 7" BOP's in cellar
¡Install tree adaptor. Test packoff to 5000 psi
I Load pits wi 2 ppb biozan
ì Safety mtg re: get 7" tree inside cellar wi 7" BOP (tite fit)
: Bring tree into cellar and set on adaptor flange studs. Thaw
i out tree. NU 7" BOP's on top of swab. Rotate all 180 deg
i using blocks to assumed correct orientation to fit S-riser wlo
modification. Set tree on adaptor flange
! Note: to fit the prior S-riser, the wing valve must face 90 deg to
: the right (parallel to Pad) when looking toward the reserve pit.
i This is the first well we have done that is this far off
i
i
Printed: 1/31/2005 8:02:45 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
BP
Operations Summary Report
Page 9 fit
Y-06
Y-06
WORKOVER
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/2/2005
Spud Date: 1/5/2005
End: 1/15/2005
Description of Operations
1/15/2005
06:00 - 15:00
From - To Hours Task Code NPT Phase
9.00 WHSUR P
RUNCMP NU BOPS. Tighen flanges. MU hydraulic hoses. Install riser to
rig floor. MU kill and choke lines.
T est tree to 5000 psi.
Date
Printed: 1/31/2005 8:02:45 AM
BP
Operations Summary Report
Page 1 .
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-06
Y-06
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/15/2005
Spud Date: 1/5/2005
End:
Date From - To Hours Task Code NPT Phase Description of Operations
1/15/2005 00:00 - 00: 15 0.25 WHSUR P RUNCMP Fin set 7" BOP's in cellar
00:15 - 02:30 2.25 WHSUR P RUNCMP Install tree adaptor. Test packoff to 5000 psi
Load pits wi 2 ppb biozan
02:30 - 02:50 0.33 WHSUR P RUNCMP Safety mtg re: get 7" tree inside cellar wi 7" BOP (tite fit)
02:50 - 06:00 3.17 WHSUR P RUNCMP Bring tree into cellar and set on adaptor flange studs. Thaw
out tree. NU 7" BOP's on top of swab. Rotate all 180 deg
using blocks to assumed correct orientation to fit S-riser wlo
modification. Set tree on adaptor flange
Note: to fit the prior S-riser, the wing valve must face 90 deg to
the right (parallel to Pad) when looking toward the reserve pit.
This is the first well we have done that is this far off
06:00 - 15:00 9.00 WHSUR P RUNCMP NU BOPS. Tighen flanges. MU hydraulic hoses. Install riser to
rig floor. MU kill and choke lines.
115:00 - 19:45 Test tree to 5000 psi.
4.75 BOPSUPP WEXIT Test BOP equipment. Test witness waived by C. Scheve with
AOGCC.
19:45 - 23:00 3.25 BOPSUP N SFAL WEXIT Blindlshear rams leaked. Replace seals and retest (four times)
wlo success (slow bleed off by horseshoe seal)
23:00 - 00:00 1.00 BOPSUP P WEXIT RU DSM and pull TWC while wlo SWS to get more seals and
new inserts
1/1 6/2005 00:00 - 01 :00 1.00 BOPSUF N SFAL WEXIT Replace blindlshear seals and retest against swab valve, ok
01 :00 - 04:15 3.25 STWHIP P WEXIT Prep injector. Move injector over well and install packoff,
gooseneck, etc. Install internal grapple and pull CT from
reelhouse thru packoff, -43F ambient
04:15 - 05:20 1.08 STWHIP P WEXIT Fill CT wi FW at 2.25/1050 reversing. Then reverse slack back
at 4.513250. Blow CT back wi air
05:20 - 08:00 2.67 STWHIP P WEXIT RU cutter and cut back CT to find slack. Head up e-coil. Test
same for pressure, pull, and continuity.
08:00 - 10:00 2.00 STWHIP P WEXIT MU BHA #1 (3.8" parabolic with 2-7/8" extreme mtr). Trouble
getting swab valve open. DSO opened bleed port, able to then
open swab.
10:00 - 11 :30 1.50 STWHIP N DPRB WEXIT Ice plug at 28' below floor. PU 2 jts PH6 dp and thaw same.
11 :30 - 12:35 1.08 STWHIP P WEXIT Complete BHA. Stab coil. Get on well.
12:35 - 13:30 0.92 STWHIP N SFAL WEXIT RIH with milling assembly. Lubricator o-ring leaking. POOH.
Get off well. Unstab coil. Change o-ring (s). Stab coil. Get on
well.
13:30 - 15:15 1.75 STWHIP P WEXIT Run in hole with milling assembly.
15:15-20:10 4.92 STWHIP P WEXIT Tag XN at 9984' (9970 ELM). PU and begin time milling @ 0.1'
per 5 minutes 2130 psi @ 2.5 bpm. Got thru after 4 stalls
20: 10 - 20:20 0.17 STWHIP P WEXIT Ream and backream wi no motor work
- 20:35 0.25 STWHIP P WEXIT ,RIH looking for cement and tagged at 10621' CTD
20:35 - 00:00 3.42 STWHIP P WEXIT Drill cement from 10620' 2.58/2230 at avg 25'/hr 2-3k wob, 150
I psi diff. Dump 20 bbls of crude cut fluid on first BU and
i plugged MM wi CL rubber. Penetration rate picked up to 45'/hr
I after stall at 10667'
1
1/17/2005 00:00 - 01 :15 1.25 STWHIPiP :WEXIT Continue drilling cement from 10720' 2.55/2230 at avg 55'/hr wi
1 3-4k wob 150 psi diff to stall at 10790' CTD
I IWEXIT
01 :15 - 01 :40 0.42 STWHIPi P Wiper back to TOC, 45k. Wiper to EOT
01:40 - 03:15 1.58 STWHIPI P ¡WEXIT POOH for window mill. Overpull at 10620'. Plugged MM with
more CL rubber (3 times)
03:15 - 03:50 0.58 STWHIPI P IWEXIT LD 0331 in gauge wi minor chipped diamonds on shoulder.
I
i I IWEXIT í Add 3.80" window mill and 3.79" SR
03:50 - 05:25 I 1.581 STWH'PI P i RIH wi BHA #2
I ,I I
I I
Printed: 1/31/2005 8:02:59 AM
BP
Operations Summary Report
Page 2 .
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y~06
Y~06
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
1/15/2005
Spud Date: 1/5/2005
End:
Date From - To Hours Task Code NPT Phase Description of Operations
1/17/2005 05:25 - 05:40 0.25 STWHIP P WEXIT Precautionary ream/backream XN nipple and no motor work.
Plugged MM again wi more rubber
05:40 - 05:50 0.17 STWHIP P WEXIT Resume RIH
05:50 - 06:15 0.42 STWHIP P WEXIT Precautionary ream cement sheath area to pinch point at
1 0807' CTD
06:15 - 09:00 2.75 STWHIP P WEXIT Milling window. TOWhip:10772'. Pinch Point: 10776'. Several
stalls getting started. 2420 psi @ 2.68 bpm. WOB: 3.52k#.
09:00 - 15:00 6.00 STWHIP P WEXIT Continue milling window. 2250 psi @ 2.65 bpm fs. 200-600
dpsi. WOB: 6.5k#. PU off btm. 45k#up, 22k#dn wt. Re-zero
DH WOB. Tag at 10782'. Resume time milling.
15:00 - 16:15 1.25 STWHIP P WEXIT Continue to time mill. Stall and pick up. Appear to be out of
casing. Drill ahead. Line up to swap to flo pro.
Top of whipstock: 10,772'
Top Window: 10776'
Btm Window: 10783'
16:15 - 17:00 0.75 STWHIP P WEXIT Drill ahead to 10793'. Begin displacement to flopro. Ream and
back ream window 3 passes. Drift dry.
17:00 - 19:00 2.00 STWHIP P WEXIT POOH for build assembly. Got more rubber back at mud/bio
interface
19:00 - 19:40 0.67 STWHIP P WEXIT LD milling BHA. Mill 3.80", SR 3.79" (same as before RIH).
Mill had center wear
19:40 - 20:50 1.17 DRILL P PROD1 MU drilling BHA
20:50 - 22:20 1.50 DRILL P PROD1 RIH wi BHA #3 (3.0 geg, HC bi bit) 1.4/2300 thru EDC
22:20 - 00:00 1.67 DRILL P PROD1 Close EDC. Log tie-in down from 10650' to correct to mother
WB 0.4/1340/3R. Corr -35' and relog to TO. Tag at 10794' w/o
pump. PUH 45k and start pump PVT 386
1/1 8/2005 00:00 - 01 :30 1.50 DRILL P PROD1 Drill build from 10793' 2.57/3200/5Rslowly while working to get
orientor to work. Started 0.2 bpm losses at 10815' PVT 378
01 :30 - 02:15 0.75 DRILL P PROD1 Drill ahead 2.7/2.5/3200/30R wi 0.5k wob, 100 psi diff 9.82
ECD at 20-30'/hr PVT 366
02:15 - 02:40 0.42 DRILL P PROD1 Wiper to 10590'. Overpull/MW at 10606'. RBIH, clean
02:40 - 03:45 1.08 DRILL P PROD1 Drill ahead from 10846' 2.7/2.4/3200/35R and losses increased
to 1.0 bpm in the next 4'. Slow penetration rate of 23'/hr and
frequent stalls ECD 9.7 Max loss rate was 1.3 bpm
03:45 - 05:00 1.25 DRILL P PROD1 Drill ahead from 10875' 2.7/1.6/3000/55R ECD 9.7 and losses
are slowly healing due to cuttings. Penetration rate is 30'/hr
and increasing wi few stalls PVT 200
- 05:45 0.75 DRILL P PROD1 Drill ahead 2.66/1.52/3000/60R at 55'/hr and have first survey
(NBI=78 deg) and on the line. Get into some ratty drilling at
110945' wi several stalls and losing more returns
2.66/1.4/300060R, PVT 143
05:45 - 06:10 0.42 DRILL P PROD1 I Wiper to EOT while wo mud. Clean to window, clean to above
I TOC. Wiper to 10500' at 2.5/1.8 PVT 100
06: 10 - 07:30 1.33 DRILL N WAIT PROD1 I Reduce rate while PUH slow and WO mud. 1.6 in/1.4 out
07:30 - 08:30 1.00 DRILL N WAIT PROD1 I Off load 290 bbls flopro. RIH to resume drilling ahead.
08:30 - 11 :30 3.00 DRILL P PROD1 i Continue to drill build section. 3100 psi fs @ 2.6 in/1.8 out.
I WOB: 1.4 k#. Rap: 60-80 fpm. Inc/AzJ Tf: 82/354/11 Or.
I Whp/Bhp/Ecd: 26/4480/9.7 ppg. IA/OA/Pvt: 4/0/300 bbls Build
I complete, all dog leg in turn. Lost all returns at 11027'.
! Continue to drill ahead. KCL and more mud on the way. IA
i has gone on a vacuum. TO build and turn at 11150
11 :30 - 13:30 2.00 DRILL P PROD1 I Circulate OOH. Call for Little Red to MIT IA with diesel.
I
I
Printed: 1/31/2005 8:02:59 AM
)
)
r
~
\ ~~
FRANK H. MURKOWSKI. GOVERNOR
AIIASKA. OIL AlWD GAS
CONSERVATION COMMISSION
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
t<}ß'1'IJÐf}-
Ted Stagg
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay Y-06
Sundry Number: 304-480
Dear Stagg:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such
further time as the Commission grants for good cause shown, a person affected by it may
file with the Commission an application for rehearing. A request for rehearing is
considered timely if it is received by 4:30 PM on the 23rd day following the date of this
letter, or the next working day if the 23rd day falls on a holiday or weekend. A person
may not appeal a Commission decision to Superior ou unless rehearing has been
requested.
(
DATED this /3day of December, 2004
Enc!.
SCANNED DEC 1 4 2004
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request:
II Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate
0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver
0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
, . .PRESENTWELL..CQNQITIQN.SUMMARV
Effective Depth MD (ft): Effective Depth TVD (ft):
11593 9581
MD TVD
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
7. KB Elevation (ft): 83.3'
8. Property Designation:
ADL 028287
11.
Total Depth MD (ft):
11643
Casing
Structural
Conductor
Surfa~
Intermediate
Production
Liner
Total Depth TVD (ft):
9621
Length
Size
0 Other
0 Time Extension
4. Current We!'.<1.lass:
~eveloP~~~PloratOry
0 Stratigraphic fir Service
5. Permit To Drill Number
180-002
6. API Number:
50- 029-20431-00-00
9. Well Name and Number:
PBU Y-06
Plugs (measured): Junk (measured):
None 10905
Burs~ Collapse
5380 ,,~Ckl 2670
46l ' 6870 "ê C ....., V~O
"I, a. I () ,-l't
81~ ~ C. <7~f 7Õ-¿{
41/,~ q"4: (J
, '".
Tubing Grade: Tubing ~(ft):
L-80 10019'
Packers and SSSV MD (ft): 9912'
2026'
13. Well Class after proposed work: VJ6/r
0 Exploratory ...ø-r:5évelopment riervice
110' 20" x 30" 110'
2689' 13-3/8" 2689'
10467' 9-5/8" 10467'
1675' 7" 9962' - 11637'
12. Attachments:
1m Description Summary of Proposal
0 Detailed Operations Program
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Ted Stagg Title CT Drilling Engineer
Signature "\Z - ~- Phone 564-4694
~ /' ;f' Commission Use'Only
Perforation Depth MD (ft): Perforation Depth TVD (ft):
10622' - 10920' 8835' - 9056'
Packers and SSSV Type: 9-5/8" x 4-1/2" GRUIB packer;
4-1/2" Otis SSSV Nipple
0 BOP Sketch
December 20,2004
Date:
110'
2689'
8722'
8362' - 9616'
Tubing Size:
4-1/2", 12.6#
15. Well Status after proposed work:
0 Oil 0 Gas
0 WAG 0 GINJ
0 Plugged
DWINJ
1m Abandoned
0 WDSPL
Contact Ted Stagg, 564-4694
Prepared By Name/Number:
Terrie Hubble, 564-4628
Da{~Þf
I Sundry Number: B () 4 ,- ({ j l)
0 Plug Integrity
0 BOP Test
Conditions of approval: Notify Commission so that a representative may witness
0 Location Clearance
0 Mechanical Integrity Test
~t. VL,{'N:'l d ~ í Ýt' ~ t; V\.q¿: ~d il LI ~ 00 A- .
L)
Other: Ap f~th/~d Ço r WL 10 -40 l
Subsequeffi (fa. L 'I .
Approved By: Ý .
Form 10-403 Revis
'-'~3DMS BFL DEC 1 4 7004
COMMISSIONER
APPROVED BY
THE COMMISSION
Date 'suilm1!f
DUPLICATE
)
)
0 JJ
To:
Winton Aubert
Sr. Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Ted Stagg
CTD Engineer
Date: Dec. 8, 2004
Re:
CTD Tubing Swap and Sidetrack ofPBU Well Y-06
PBU Well Y -06 is scheduled for a tubing swap and a through-tubing sidetrack with Nordic 2 and coiled tubing.
Prior to the tubing swap, a mechanical whipstock will be set in the 7" liner and all existing perforations will be
squeezed with cement. After testing the cement, Nordic 2 will pull the existing tubing and install new 4 ~"
tubing and production packer. The sidetrack, Y -06A, will kick off from the mechanical whipstock and drill a
Zone 4 sidetrack to be completed with a fully cemented liner as an injector. The following describes work
planned to prepare Y -06 for a tubing swap and sidetrack and is submitted as an attachment to Form 10-403. A
schematic diagram of the proposed tubing swap and sidetrack is attached for reference.
1. Confirm integrity of casing and OA.
2. Function lock down screws.
3. Pump a Schmoo-B-Gonejob.
4. Run whipstock drift.
5. Set mechanical whipstock at 10,772' MD.
6. Cement squeeze all perfs using a minimum of 20 bbls cement. Wash out to top whipstock.
7. Pull DGLV from station #1 at 9626'. Circulate well to 8.5 ppg sea water. Freeze protect.
8. Chern. Cut 4 ~" tubing at 9873' .
9. Install BPV. Prep for Nordic 2.
Step 6, cement squeezing of all existing perforations, is scheduled for the week of Dec. 20, 2004.
Nordic 2 is scheduled to begin the workover approx. Dec. 27, 2004.
~~..
TedS:.:?;7
CfD Drilling Engineer 5'(,'!-ŸI;1r
cc:
Well File
Terrie Hubble
)
TREE =
Wa.LHEAD =
A CTUA ToR =
KB. ËLEV =
BF. ElEV =
KÓP=
Max,,~n.~~ =
Datum MD =
Datum TVD =
6" rvcEVOY
rvcEVOY
OTIS
à"1:26;
, 5f76'
34 60'
.. . .. ~.n ~-,
46 ~. 6T~g:
10687
8800' SS
13-318" CSG, 72#, L-BO, ID = 12.347" H 2689'
Minimum 10 = 3.725" @ 9985'
4-1/2" OTIS XN NIPPLE
I TOP OF 7" LNR H 9962'
I 4-1/2" TBG. 12.6#, L-80, 0.0152 bpf, ID = 3.958" H 10019'
Y-06
41)
r-J
L
I I
l
8J
J
:8:
~! ,~
9-5/8"CSG,47#.L-80,ID=8.681" H 1046T f---tI
PERFORATION SUfvt.J1ARY
RS: LOG: SWS - BHCSlGR ON 03104180
ANGLEATTOPÆRF: 44@ 1062Z
t-bte: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OpnlSqz ()A.TE
3-318" 6 10622 - 10657' 0 04103189
3-1/8" 6 10760 - 10772' 0 08101180
3-1/8" 6 10782 - 10800' 0 08101180
3-1/8" 6 10820 - 10840' 0 08101180
3-1/8" 4 10850 - 10920' 0 06104185
!
I
I
I
-..
t PBTD H 11593' I ~~
7"LNR 29#.L-80, 0.0371 bpf,ID=6.184" H 1163T ~...
I)ð. TE REV BY COMM:NTS
03112/80 LEM:>1f\E ORIGINAL COM\.ETION
02f27/01 SIS-QAA CON\! ERTID TO c:A N\! AS
03tC3/01 SIS-MO RNAL
06f24/oo Rf'lTP CORRECTIONS
OA TE REV BY
COMWENTS
')
I SAFETY !\OTES
2026' LJ4-112" OTIS SSSV NIP, 10= 3.813" I
= ~ 2596' H9-518" OJ A<R 1
~
GAS LIFT Ml\NJRa.S
ST fvÐ TVD OEV TYÆ LATCH VLV
5 2947 2866 1 rvcMY RK 1-1/2"
4 5339 4937 45 rvcMY RK 1-1/2"
3 8045 6856 45 rvcMY RK 1-1/2"
2 9463 7916 42 rvcMY RK 1-1/2"
1 9626 8034 44 rvcMY RK 1-1/2"
9853' IJOTISXASLlOINGSLEEVE 10=3.813" I
I 9889' LI GUIB PBR SEAL ASSY I
r 9912' W9-518" x 4-1/2" GRUIB PKR. ID = 3.833" I
I 9953' IJ4-1 12" OTIS X NIP, 10=3.813" 1
I 9985' H4-112" OTISXN NIP, 10= 3.725"1
I 10019' H4-112" 1BGTAtL, D =3.958" 1
I 10005' H ELfvÐTT LOGGID 12/10/901
..
I 1 0518' 1--1 MA. RKER JOINT 1
I 10905' H PA Rf OF 4-1/2" MI\ GA RANGE A..UG
FRLDHOE SA Y UNT
Wa.L: Y -06
PERv11T No: 80-0020
A PI No: 50-029-20431-00
Sec. 34, T11N,R13E
BP exploration (Alaska)
TREE =
WB.LHfAO :=
ACTUA TOR :=
""KB. aEV =
BF. aEV =
KOP=
Max Angle =
Datum M:> =
Datum lVO :=
6" t.IC8IOY
t.IC8IOY
OTIS
81.26'
51.76'
3400'
46 @ 6700'
10687'
8800' SS
)
Y-06Ai
Proposed CTD Sidetrack
~ ~
')
SAFETY NOTES
2000' IJ X NIFft.E FOR WL REm SSSV
13-318" CSG, 72#, L-80, Ð = 12.347" I-{ 2689' r-J
= ----i 2596' H 9-5/8" OV PKR 1
~
Minimum ID =
I TOP OF 7" LNR I-{
r TOP OF 3-3/16" lNR & Toe I-{
l~:~~_~~ Nip 2.75" 10-
J 4-1/2" TBG, 12.6#, L-80. 0.0152 bpf, ID = 3.958" -
9962'
9975'
9985'
10019'
:&
~
.....
'"
g
~
rJ~t~
9-5/8" CSG, 47#, L-80. D = 8.681" l-i 10467' ~
PERFORA TION SUMv1ARY
REF LOG: SWS - BHCSIGR ON 03/04/80
ANGLE AT TOP PERF: 44 @ 10622'
Note: Refer to Production DB for historical perf data
SIZE SA= MERV AL Opn/Sqz DA TE
3-3/8" 6 10622 - 10657' isolated proposed
3-1/8" 6 10760 - 10772' isolated proposed
3-1/8" 6 10782 - 10800' isolated proposed
3-1/8" 6 10820 - 10840' isolated proposed
3-1/8" 4 10850 - 10920' isolated proposed
I FÐTD H 11593'
I 7" L~ 29#, L-80, 0.0371 bpf. Ð = 6.184" H 11637'
OA TE REV BY COMÆNTS
03112/80 LEMONt ORIGNAL ~ETION
02127101 SIS-OAA CONVERTED TO CANVAS
03103101 SIS-M:> FNAL
06124/00 RN'TP CORRECOONS
11/16104 MSE PROPOSEÐ em SŒTRAO<
\ }
13-3/16" L-80 TC-II crTt'ed and perfed l-f 12500' 1
DATE REV BY
COMÆNTS
~
1-19-5/8" x 4-1/2" PKR
I 9889' Ij GUIB FÐR SEAL ASSY I
I 9912' Ij9-5/8" x 4-1/2" GRUIS PKR, ID = 3.833" 1
I 9953' Ij4-1/2" OTIS X NIP, Ð = 3.813" 1
I 9985' H4-1/2" OTIS XN NIP, Ð nilled to = 3.800"
I 10019' H4-1/2" TBG TAL, Ð = 3.958" 1
I 10005' 1-1 ELMO TT lOGGED 12/10/901
I 10518' I-{MARKERJOINT I
c::::::J
'"----I
10772' 1-; Mechanical Whipstock
I 10905' I-{PARTOF4-1/2" MAGARANGEPLUG 1
PRUDHOE BA Y UNIT
WELL: Y -06A
PffiMIT No:
API No: 50-029-20431-01
Sec.34.T11N,R13E
BP exploration (Alaska)
MEMO RAND UM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
~1'n C¡/Zòjo4
DATE: Wednesday, September 15,2004
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
Y-06
PRUDHOE BAY UNIT Y-O6
FROM:
Lou Grimaldi
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv ~
Comm
NON-CONFIDENTIAL
Well Name: PRUDHOE BAY UNIT Y-06 API Well Number: 50-029-20431-00-00 Inspector Name: Lou Grimaldi
Insp Num: mitLGO409I4154919 Permit Number: 180-002-0 Inspection Date: 9/1412004
Rei Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well Y-O6 Type Inj. G TVD 8325 IA 1020 2500 2490 2490
P.T. 1800020 TypeTest SPT Test psi 2081.25 OA 10 20 15 15
Interval 4YRTST P/F P Tubing 570 570 570 570
Notes:
Wednesday, September 15, 2004
Page lofl
~t::; I -VO ~r 11.1 It I OVVV...V) VV /"\.\.J 1I1Jt::~lUl WIUI ;:)lUW I XI/"\. \..-UllllllWl...
~
~
Thanks for the notification; please add this to your monthly waiver list for
injectors (if not already done).
Jim Regg
AOGCC
NSU, ADW Well Integrity Engineer wrote:
Hi Jim and Winton,
Y-06 (PTD #1800020) is exhibiting slow TxIA communication. Wellhead pressures
are under trigger pressure at 2456/1880/120 and therefore the well is not
considered a problem well at this time.
Our plan forward:
1. Operations: Swap well to water injection as soon as possible
2. DHD: Conduct MITIA - Send results to AOGCC
3. WIE: Eval MITIA results
Please let me know if you have any questions.
Anna Dube
Well Integrity Coordinator
GPB Wells Group
Phone: (907) 659-5102
Pager: (907) 659-5100 xl154
1 of 1
4/23/20044:16 PM
Unocal Corporation (
Od & Gas Operabons
909 West 9th Avenue, P O Box 196247
Anchorage, Alaska 99519-6247
Telephone (907) 276-7600
UNOCALd
March 20, 1996
Alaska
Mr David Johnston, Commissioner
Alaska Oil & Gas Conservation Comm.
3001 Porcupine Drive
Anchorage, Ak. 99501-3192
Dear Commissioner Johnston.
Re: Dolly Varden Platform - Well D-12RD
/~PI Number 50-733-20142-01
The following intervals were perforated in Well D-12RD:
HB-0 11,150 11,160 10 6/25/94
HB-0 11,190 11,200 10 6~25~94
HB-1 11,230 11,240 10 6~24~94
HB-3 11,412 11,432 20 6~24~94
HB-4 11,485 11,515 30 6~24~94
TOTAL 80
Very truly yours,
G. Russell Schmidt
Drilling Manager
STATE OF ALASKA ('
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Operations performed.
2 Name of Operator
Operation shutdown....- Stimulate -.-. Plug ig_~ -.-
Pull tul~ng After casln~l Repair well
UNION OIL COMPANY OF CALIFORNIA (UNOCAL)
3 Address
P.O BOX 196247 ANCHORAGE~ AK 99519 - 6247
4 Location of well at surface
678' FSL, 1,217' FWL, Sec 6, T8N, R13W, SM
At top of productive ,nterval
1,251' FWL, 2,526' FNL, Sec 8, T8N, R13W, SM
At effective depth
1,131' FWL, 2,418' FNL, Sec 8, T8N, R13W, SM
At total depth
1~165' FWL, 2,620' FNL Sec 8~ T8N~ R13W, SM
12 Present well condition summary
Total depth measured 12,050
true ver'acal 10,188
J5 Type of Well
Development
Exploratory
Stratigraphic
Sennce
ORIGINAL
Perforate X
Pull tul~n~l Other
6. Datum elevabon (DF or KB)
106 KB above MSL
7 Unit or Property name
Trading Bay UnR
8. Well number
D-12RD
feet
9. Permit number
80-02/94-117
10. APl number
50-733-20142-01
11 Field/Pool
Hemlock
feet Plugs (measured) 11,904' - 12,050' CMT
feet
Effective depth: measured 11,894
true veFacal 10,038
feet Junk (measured) 11,894' - 11,904' Pkr
feet
Casing Length Size
Cemented Measured depth True ve~cal depth
Structural
Conductor
Surface
Intermediate
9,365' 9-518" 2,326 sx 9,365' 7,727'
Producbon 2,894'
bner
PerforatJon depth measured
true verbcal
Tubing (s~ze, grade, and measured depth)
Packers and SSSV (type and measured depth)
7" 850 sx 12,031' 10,168'
See Attachment #1
ECEIVI
3-1/Z', 9 2#, N-80 Tbg to 11,070' Jl~aska Oil & Gas Cons. C0~
Anchorage
3-1/2" Otis DC TRBV SCSSV @ 310'; Ohs WD Pkr @ 11,014'
13 Stlmulabon or cement squeeze summary
Intervals treated (measured)
14
Treatment description including volumes used and final pressure
Representative Daily Average Production or Injection Data
O~l-Bbl Gas-Mcr Water-Bbl Casing Data
Tubing Pressure
Prior to well operation 292 16 471 1160 140
Subsequent to operabon 489 y 350 776 1150 135
15 Attachments 16 Status of well classification as'
__
Copies of Logs and Surveys run
Daily Report of Well Operabons Oil X Gas Suspended Service
17 I hereby certify that the fo{~o/,r~g is tr~e~a)n~.,~est of my knowledge
Signed G Russell Schmidt~t~-~~~~~e DrllhngManager Date
Form 10-404 Rev 06/15/88 1" -
SUBMIT IN DUPLICATE
D
nission
ATTACHMENT #1
WELL D-12RD
BENCH MD TVD
0 11,190 11,200 9,379 9,388
1 11,225 11,240 9,415 9,429
2 11,250 11,268 9,434 9,451
3 11,350 11,360 9,526 9,536
,,
3 11,412 11,432 9,588 9,607
4 11,440 11,470 9,610 9,637
4 11,485 11,495 9,656 9,661
4 11,496 11,520 9,662 9,688
4 11,530 11,580 9,693 9,744
5 11,596 11,630 9,759 9,790
5 11,690 11,715 9,843 9,867
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 26 April 1994
RE: Transmittal of Data
Sent by: ANCHORAGE XPRES
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL ~ DESCRIPTION ECC No.
1 PDK/GR/CCL FINAL BL
-~ PDK/GR/CCL RF SEPIA
Run ~ i 5842.04
Run ~ i
~ -~ P-02 . 1PLS LEAKDET.FINAL BL Run # I 6021.04
~PLS LEAKDET.RF SEPIA Run # 1
1PLS STATI/~ FINAL BL
~1PLS SX4TTIC RF SEPIA
~3~5~ D-O7A
1 SPNR/TEMP FINAL BL
,-~ SPNR/TEMP RF SEPIA
PLS INJPROF.FINAL BL
PLS INJPROF RF SEPIA
~0--0~- Y-06 (23-28-11-13)
1 PLS STATI~ FINAL BL
/1 PLS STKTIC RF SEPIA
Run # 1 6149.01
Run # 1
Run # 1 6021.05
Run # I
Run ~ 1 6180.00
Run ~ I
Run # 1 5751.03
Run # 1
Received by:
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Date:
Received by:
Please sign and return to: Sonya Wallace (MB 3-3)
Petrotechnical Data Center
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
Anchorage, Alaska 99508 ~/aska Oil ~ Coo&
.Orage C°rnrni,~ion
Date =
STATE OF ALASKA COMMI~ -)N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations pedormed: Operation shutdown Stimulate Plugging
Pull tubing Alter casing Repair well
Perforate
Other X
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1318' SNL, 225' EWL, SEC. 34, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
2075°NSL, 1663'EWL, SEC. 28, T11N, R13E, UPM
At total depth
2218'NSL, 1581'EWL, SEC. 28, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11643feet
true vertical BKB 9621feet
5. Type of Well:
Dov~lopmenl~
Exploratory
Stratlgraph~c
ser~c~'A"
Plugs (measured)
6. Datum elevation (DF or KB)
KBE = 81.26 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-06 (23-28-11-13) PBU
9. Permit number/approval number
80-2/
10. APl number
50- 029-20431
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11370feet
true vertical BKB 9403feet
Junk (measured) fill at 11370' MD (07/85)
Casing Length
Structural --
Conductor 110
Surface 2660
Intermediate 10438
Production --
Liner 1675
Perforation depth: measured
Size Cemented
20x30 12c. y.
13 3/8 3854 c.f.
9 5/8 1648 c.f.
7
10622'-10657' (Sag R)
true vertical
Tubing (size, grade, and measured depth)
Measured depth
139
2689
10467
460 c.f. 9962-11637
10760'-10772', 10782'-10800', 10820'-10840', 10850'-10920' (Ivishak)
subsea 8752'-8778' (Sag R)
8854'-89 74' (four Ivishak intervals)
4 1/2"L-80 to 9912' with 4 1/2"tailpipe to 10019'
True vertical depth
BKB
139
2689
8722
8362-9616
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026'
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
Anchorage
14.
Representative Daily Average Production or Injection Dar~,
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service t4/ater injection well
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed (~~~.~L {/~_ ~,~ Title SeniorTechnicaiAssistantl
Form 10-40z~ Rev 06/15/88' / '
Date d~°,x~.~,/~
SUBMIT IN DOPLIC'ATE
WELL Y-06 (23-28-11-13}
Variance
Due to further inspection. The Variance for a down hole leak Proposal
for the above well was not performed.
7/27/92
RECEIVED
AUG - 5 ~B92
Anchora.q~
(
BP EXPLORATION
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :04/17/91
T#:82316
FROM'
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
E-02
H-17
Y-06
~q.q~ .-Z-18
GL 03/06/91 #1 9700-9950 HLS 5"
Peal 02/16/91 #1 10200-10620 HLS 5"
CL 02/26/91 #1 9800-10030 HLS 5"
Ped 02/13/91 #1 13590-13781 HLS 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
APR ?_ 5 19 1
Alaska Oil & Gas Cons. (.;ommission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :12/26/90
T#:81955
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINAL,~
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
S-25 Prod-F 12/05/90 # 1 9150-9564 Camco 5"
Y-11 Jewelry Log 12/09/90 #1 8800-9800 Camco 5"
Y-06 Jewelry Log 12/09/90 #1 9800-10600 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
JAN 5 1991
Alaska 011 & Gas Cons. Commission
~chorage
To AOGCC Commissioners
From
R. C. Bachman .,~<C,~,_
Production Engineering Supervisor
Subject Variance for Y-06i to Continue Injection
Injection well Y-06i has developed communication from tubing to inner annulus.
The well annulus will pass a Mechanical Integrity Test but over a period of 12
hours will build to injection pressure (still within safe operating limits).
The wellhead has been tested and verified that the leak is downhole.
Spinner and temperature logs have been run on Dec 9 in an attempt to locate
the leak but it is too small. We will likely be plugging the well and running a
noise Icg in the near future to locate and repair if possible.
We are requesting a variance to continue injection until the leak is found and
repaired. Daily close monitoring of the well's conditions will continue.
CC:
Y-06i
GL PE
RECEIVED
DEC 1 4 1990
Alaska 0il & (las Cons. Commission
Anchorage
, ( STATE OF ALASKA O(h
ALASKA OIL AND GAS CONSERVATION COMMISSI
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon ~ Suspend
Alter caang Repar well~
Change approved program ~
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1318' SNL, 225' EWL, SEC. 34, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
2075' NSL, 1663' EWL, SEC. 28, T11N, R13E, UPM
At total depth
2218'NSL, 1581'EWL, SEC. 28, T11N, R13E, UPM
Opera'aon Shutdown __
Plugging __
Pull tubing __ Vanance X
5. Type of Well:
Development X
Explorato~/
Stral]graph~c
Set. ce
Re-enter suspended well __
Time extension Stimulate
Perforate Othe~
6. Datum elevation (DF or KB)
KBE= 81.26 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-06 (23-28-11-13) PBU
9. Permit number
80-2
10. APl number
50- 029-20431
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
11643 feet Plugs (measured)
true vertical BKB 9621 feet
Effective depth: measured 11370 feet Junk (measured) fillat 11370'MD (07/85)
true vertical BKB 9403 feet
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 x 30 12 c.y. 139
Surface 2660 13 3/8 3854 c.f. 2689
Intermediate 10438 9 5/8 1648 c.f. 10467
Production --
Liner 1675 7 460 c.f. 9962-11637
Perforation depth: measured 10622'-10657' (Sag R)
10760'-10772', 10782'-10800', 10820'-10840', 10850'-10920' (Ivishak)
true vertical subsea 8752'-8778' (Sag R)
8854'-8974' (four Ivishak intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9912' with 4 1/2" tailpipe to 10019'
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026'
True vertical depth
BKB
139
2689
8722
8362-9616
RECEIVED
DEC 1 4 1990
Alaska 0il & Gas Cons. C0m~t~
Anchorage
13. Attachments Description summary of proposal X Detailed operations program __
BOP sketch
14. Estimated date for commencing operation
DECEMBER 1990
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil __ Gas __ Suspended __
Service water iniection well
17. I hereby ce_~ify that th.e,,foregpirrg is true and correct to the best of my knowledge.
Signed ~/C~'~~ Titlo PRODUCTIONENGINEERINGSUPERVISOR
Date 8 DEC 90
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity __ BOP Test __ Location clearance __
Su~seouent
Mechanical Integrity Test for, m,,rectuJred 10- /--~/--~
-- Ap~3rovea ~,utsy
Re, turne(~
Approved by order of the Commission I o~.~-'__ '/~r"l0
Form 10-403 Rev 06/15/88
I
Approval Not,z)
Commissioner Date
ORIGINAL SIGNED
LONNIE C.
SUBMIT IN TRIPLICATE
BP EXPLORATION
April 24, 1989
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well Y-6 (23-28-11-13) PBU
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
Waterflood & Miscible Flood
BJP:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
RECEIV£D
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Plugging
Repair well
5. Type of Well:
Exploratory
StratJgraphic
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1318' SNI., 225' EWL, SEC. 34, T11N, R13E, UPM
At top of productive interval
N/A - water Injection well
At effective depth
2075' NSL, 1663' EWL, SEC. 28, T11N, R13E, UPM
At total depth
2218' NSL, 1581' EWL, SEC. 28, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Effective depth: measured
true vertical BKB
Stimulate
Alter casing
Perforate X
Other
6. Datum elevation (DF or KB)
KBE . 81.26 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-06 (23-28-11-13) PBU
9. Permit number/approval number
80-2 / 9-189
10. APl number
50- 029-20431
11. Field/Pool
Prudhoe Oil Pool
11643feet Plugs (measured)
9621 feet
11370 feet
9403feet
Junk (measured) fill at 11370'MD (07/85)
Casing Length
Structural --
Conductor 110
Surface 2660
Intermediate 10438
Production --
Liner 1675
Perforation depth:
Tubing (size, grade, and measured depth)
Size Cemented Measured depth
20 x 30 12 c.y. 139
13 3/8 3854 c. fo 2689
9 5/8 1648 c.f. 10467
7 460 c.f. 9962-I 1637
measured 10622'-10657' (Sag R)
10760'-10772°, 10782'-10800', 10820'-10840', 10850'-10920' (Ivishak)
true vertical subsea 8752'-8778' (Sag R)
8654'-8974' (four Ivishak intervals)
4 1/2" L-80 to 9912' with 4 1/2" tallpipe to 10019'
True vertical depth
BKB
139
2689
8722
8362-9616
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
g 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026'
APR 2
· as/a Oil & Gas Cons, C~m/ss~0n
14.
Prior to well operation
Subsequent to operation
Reoresentative Daily Averaae Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
9350
9800
Tubing Pressure
1350
1250
16. StatusofwellclassEication as:
Oil Gas Suspended
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations X
17. I hereby certify that the for~i~(~g i,~rue and correct to the best of my knowledge.
Si~ned ~~'-~~_ Title Supervisor Waterflood/Miscible Flood
Form 10-404 Rev 06/15/88 ~
Service water in. iection well
SUBMIT IN DI. JPLIdATE
¢
W]~LL Y-fi6 (23-28-11-13~ PBU
AI)D'L. PERFORATION OPERATIONS
The following Sag R. interval was perforated April 3, 1989 using Schlumberger 3 3/8"
carrier guns at 6 spf:
10622' - 10657' MD BKB (Ref. BHCS, 3/4/80)
A lubricator was installed and tested to 3500 psi for all well work. Thc well was
returned to injection immediately following perforating operations.
jm
4/19/89
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
E~XON
TEXACO
70: MOBIL
PHILLIPS
STATE OFALASKA
GEOSCIENCES
RESERVOIR
REFERENCE: ARCHIVES
BP CASED HOLE FINAL LOGS
BP Explorat,on (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Da*e: 04-10-89
T~: 79947
The following material Is being subml'l-i'ed herewith. Please acknowledge receipt by
signing a copy of this letter and re?urnlng It ?o ?his office:
Y-06i PERF 04-03-89 #1 10435-10700 Sch 5°.
Received
Date
Shirley R. McCurry
INFORMATION CONTROL
Well Records LR2-1
BP EXPLORATION
March 9, 1989
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-6 (23-28-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
Yours very truly,
Supervisor Waterflood & Miscible Flood
BJP:JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
BP EX~I.O~ON
HOUSTON
ARCO
CHEVRON
EIXON
TEXACO
TO: MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCF-S
RESERVOIR
REFERENCE: ARCHIVES
·
" BP'CASED HOLE FINAL LOGS
BP Exploration (Alaska) Int.
900 East Benson Boulevard
I~[ Box 196612
Anchorage, Alaska 99519-6612
(9O7) 561-5~11
Da't'e: 03-13-89
TI: 79875
The following ma*erial Is being submitted herewl*h. Please acknowledge recelp* by
slgnlng a copy of this lef~rer and re*urning I? ~o ?hls office:
C-29 PITS 02-18-89 #1 11400-11880 Camco 5"
C-30 PROD-F 02-22-89 #1 9300-9620 Camco 5"
C-31 PITS 02-20-89 #1 11400-11635 Camco 5"
F-15 PITS 02-17-89 #1 9100-9650 Camco 5"
F-18 INJ 02-23-89 #1 11850-12350 Camco 5"
H-29 GLS 02-19-89 #1 SURFACE-8700 - Camco 5"
M-06 PROD-F 02-18-89 #1 11000-11650 Camco 5"
S-09 INJ 02-19-89 #1 9850-10245 Camco 5"
W-27 PROD-F 02-16-89 #1 11250-11450 Camco 5"
W-29 PROD-F 02-15-89 #1 10500-10850 Camco 5"
Y-06 INJ 02-17-89 #1 10600-11350 Camco 5"
Y-08 GLS 02-16-89 , #1 3100-88z~7 Camco '5"
Received
Da*e
Also .....
Shirley R. McCurry
I NFORHAT i ON CONTROL
We i I Records LR2- I
STATE OF ALASKA
SKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend ~
Alter casing ~ Repair well
Change approved program
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1318' SNL, 225' EWl., SEC. 34, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
2075' NSL, 1663' EWL, SEC. 28, T11N, R13E, UPM
At total depth
2218' NSL, 1581' EWL, SEC. 28, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Operalion Shutdown ~
Plugging
Pull tubing ~ Vmience ~
5. Type of Well:
Development x
Exploratory
S~'atlgraphic
Re-enter suspended well~
Time extension Slimulate
Perforate X Olher
6. Datum elevation (DF or KB)
KBE - 81.26 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-06 (23-28-11-13) PBU
9. Permit number
80-2
10. APl number
50- O29-2O431
11. Field/Pool
Prudhoe Oil Pool
11643 feet Plugs (measured)
9621 feet
Effective depth: measured 11370 feet
true vertical BKB 9403 feet
Junk (measured) fill at 11370' MD (07/85)
Casing Length
Structural ..
Conductor 110
Surface 2660
Intermediate 10438
Production --
Liner 1675
Perforation depth: measured
Size Cemented
Measured depth
139
2689
10467
20x30 12c. y.
13 3/8 3854 c.f.
95/8 1648c. f.
7 460 c.f. 9962-11637
10760'- 10772', 10782'-10800', 10820'-10840', 10850'-10920'
True vertical depth
BKB
139
2689
8722
8362-9616
true vertical subsea
8854'-8974' (four intervals)
Tubing (size, grade, and measured depth) 4 1/2"L-80 to 9912' with 4 1/2"tailpipe to 10019'
Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026~ '
13. Attachments Description summary of proposal x Detailed operations program
BOP sketch
14. Estimated date for commencing operation I 15. Status of well classification as:
February 1989
16. If proposal was verbally approved Oil X Gas
Name of approver Date approved Service
17. I hereby certify that the foregoing js true and correct to the best of my knowledge.
_7 FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance ~
Mechanical Integrity Test~ Subsequent form required 10-
Approved by order of the Commission
Form 10-403 Rev 06/15/88
ORIGINAL SIGNED BY
I EINklIF P. RMITI-I
Commissioner
Approved Copy
Returned
SUBMIT IN TRIPLICATE
WKLL Y.06 ¢23.2g-11-13~ PBU
ADD'L. PERFORATION PROPOSAL
We propose to perforate the following Sag River interval during February 1989:
10622' - 10657' MD BKB (Ref. BHCS, 3/4/80)
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to injection immediately following perforating operations, then tested.
jm
2/10/89
FLOW TUBES
& PACKOFF
BOWEN PACKOFF
J-.-- HAND
GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE
FLOWLINE ~J
VALVE
GREASE LINE
GREASE
~/~ '" MANIFOLD
.~. GREASE
' PUMP
·
RISER
..-GREASE
RESERVOIR
BOP
C. V~ C~hatterton
Chai,~.,' n
Lonnie C. Smith
Commis s ioner
Bobby D. Foster
Petroleum Inspector
CONSERVATION COMMISS ION
December 16, 1986
D. BDF. 89
Mech Integrity Test
SAPC PBU Pads S, M, U,
R, N, T, Y, H, F, X
Prudhoe Oil Pool
~ednesday, November 19~ 1986: The tests began at 7:00 a.m. and
were concluded for the day at 4:30 p.m. with 10 wells being tested.
Thursday~ November 20~ 1986: The tests began at 7:00 a.m. and were
concluded for the day at 7:00 p.m. with 14 wells being tested.
Friday~ November 21~ 1986: The tests began at 6:30 a.m. and were
concluded for the day at 4:30 p.m. with 10'wells being tested.
Saturday~ November 22~..1986: The tests began at 6:30 a.m. and were
concluded at 1:00 p.m.; and were resumed at 6:00 p.m. and concluded
for the day at 9:00 p.m. ~£ O~'~..
As the attached mechanical integrity~ ~Io~stest ~ports show
were tested, all of which met the/~AOGCC regulations.
In summary, I witnessed the mechanical integrity tests on Standard
Alaska Production Company's injections wells listed on the attached
test forms.
Attachments
0
AI~SKA OIL AND ~ OONSERVATION CEI'EMTSSION
MECHANICAL INTEGRITY TEST
PR~I'~T START 15 bgNi 3O MIN
*P *I TYPE OF PKR CASING TBG REQ TBG TIME TI1
WELL *S --- ANNULUS TVD SIZE/WT/GRADE SIZE TEST CSG TBG TBG %~G CfPIqENTS
*M *lq FLUID MD PRESS PRESS CSG CSG CSG
PRESS PRESS PRESS
SALT WATER INJ GLYCOL
MISCI]%~ ~ INJECTION SALT WATER
IN3ECTIN~ DRrr LING b~JD
.,, N m NOT ~ OTHER
D.EteS.06 A
20 AAC 25.030(a)
20 AAC 25.412(c)
20 AAC 25.252(d)
SOHIO ALASKA PETROLEUM COMPANY
DALLAS
ARCO
CHEVRO';
E~XON
TO D.~L/UNIT/STATE: TEXACO
(-Marathon) blOBIL
PHILLIPS
STATE OF AK
3111 C'STREET
ANCHORAGE ALASKA
TELEPHONE 1907l 265 0000
IVIAIL POUCH 6-612
ANCHORAGE. ALASKA 99502
Date:
03/13/86
76933
BPAE
GEOSCIENCES
RE~'ERENCE
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herew,th. Please acknowledge rece,ot by signing a
cody of this letter and returning It to this off,ce:--
DAL/UNIT/STATE:
~A-26
"-. D-26
~N-2
~X-9
"-Y-6
~Y-iO
DFT 02/21/86 #1 10400-11020 GO 5"
GR 02/11/86 #3 9700-10900 GO 5"
Gas Lift Temp. Survey 03/08/86 #1 3050-8750 Camco 5"
Temperature(Pump-in) 03/5-6/86 #2 12000-12500 Camco 5"
injection Profile-SPINNER 02/15/86 #1 10600-11332 Camco 5"
Temperature(Pump-in) 02/-1/86 #1 9150-10153 GO 5"
R£CE~vFD
INDEXED
--
SOHIO ALASKA PETROLEUM COMPANY
DALLAS
ARCO
CHEVRON
EXXON
31 1 1 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99502
TO DAL/UNIT/STATE: TEXACO
(-Marathon) MOBIL
Date: 03/13/86
PHILLIPS T~:
STATE
76934
BPAE (Transmittal Only)
--
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
/'
A-II
B-13
C-12
C-12
D-13
K-4
G-3
H-9
J-9
N-19
U-8
X-10
¥-5
¥-6
Y-18
Step Rate 02/12/86 Camco
Step Rate 02/13/86 Camco
Static Gradient 02/11/86 Camco
Static Gradient 02/29/86 Camco
BHPD 01/30/86 Camco
Static Gradient 01/30/86 Camco
Static Gradient 02/25/86 Camco
Static Gradient 02/09/86 Camco
Step Rate 02/14/86 Camco
Static Gradient 02/09/86 Camco
Flowing Gradient 02/09/86 Camco
Static Gradient 02/22/86 Camco
Static Gradient 02/19/86 Camco
Step Rate 02/18/86 Camco
Static Rate 02/15/86 Camco
Step Rate 02/21/86 Camco
RECEIVED
DATE
-' ~ ~ idge LR2-1
- - drVic:
;~2~-c2 ;3, z~;'2.": . I~FORMATION CONTROL
...... ~/// ;~z~-~ C, L i~: i~ ~-,~ 2~ ~ell Records LR2-1
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502~612
September 1 8, 1 985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
·
Attention: I.Ir; C.V. Chatterton
Well A-3, A-8, A-27, B-13, H-9, Y-6, Y-11, and Y-18 PBU
Gent] emen:
Enclosed in duplicate, is Forum 10-403, Sundry Notices and Reports on
Wells for the above named wells. These contain our subsequent
reports of having converted them from oil wells into water injection
wells.
Yours very truly,
k
'6
SOHIO ALASKA PETROLEUM COMPANY
M. D. Martin
Senior Petroleum Engineer
RECEIVED
Enclosures
cc: T. N. Tyler, (MBg-2)
Well Records, (LR2-1)
Drilling Well File #17
OCT 0 7 1985
Alaska Oil & Gas Cons. Commission
Anchorage
{' STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL
OTHER []
2 Name of Operator 7 Permit No
SOHIO Alaska Petroleum Company 80-2
3 Address 8 APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 5o-029-20431
4 Location of Well
At Surface'
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPH
5 Elevation ~n feet (,ndmate KB, DF, etc )
KBE : 81.26' AMSL
12
Lease Designation and Serml No
ADL 28287
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-6 (23-28-11-13)PBU
11 Field and Pool
Prudhoe Bay
Prudhoe Oi 1
Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit m Tnphcate) (Submit m Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
This well was converted from a Prudhoe Bay production well into a water
injection well for Western Peripheral Wedge Zone (W. P.W.Z. ) on
September 8, 1985. Water was injected through the following perforations at
4 s.p.f.
10760' -- 10772' BKB
10782' -- 10800' BKB
10820' -- 10840' BKB
10850' -- 10920' BKB
RECEIVED
OCT 0 ?
Alaska Oil & Gas Cons. Commission
Anchorage
~ereby certify that the foregol_ng i~o the best of my knowledge
S~n7 .d~;;;~.~.~~"~~--~"~ Title Senior Petroleum Engineer , Date
Tl~e space below for Commission use
Conditions of Approval, if any
By Order of
Approved by COMMISSIONER the Commission Date__
Form 10-403
Rev 7-1-80
Submit "Intentions" m Triplicate
and "Subsequent Reports" m Duplmate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907! 265-0000
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99 502
Date: 09/16/85
T#: 7 6433
REFERENCE-
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
~'-A-1 '--- Static 08/21/85 Camco
. A- 5~' Static 09/02/85 Camco
-8 f Static 07/09/85 Camco
~A-11- Static 09/05/85 Camco
Pres.Drawdown 08/07/85 Camco
Pres.Drawdown 07/12/85 Camco
~"'B- 6 ' Static 09/09/85 Camco
~'"C-16- BHPD & PBU 09/01/85 Camco
~-17- Static 08/26/85 Camco
~'E-17 Static 08/28/85 Camco
~-F-9'- PBU &-BHPD 08/12/85 GO
~-9 ~'
PBU 07/11/85 Camco
-'"~ZR-6--~ PBU & BHPD 08/15/85 GO
~R-9-'~ Flowing Gradient 08/20/85 Camco
'~'R-2~ Step Rate Test 05/29/85 Sch
'~'R-24 / Data Frac 05/29/85 Sch
'~'U-4 - Static 09/05/85 Camco
~U-5j Static 09/05/85 Camco
-8~' Static 08/17/85 GO
-9j Static 08/30/85 Camco
-5' Static 09/04/85 Camco
-6-- Flowing Gradient 08/27/85 Camco
~Y-8" Static 09/07/85 Camco
~Y-11/Flowing Gradient &~HPD 08/26/85
Camco
RECEIVED
DATE
Victoria Aldridge LR2-1
Technical Documentation
Records Management
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
August 21, 1985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention' Mr. C.V. Chatterton
Wells A-3, A-8, A-16, A-27, B-13, H-9, U-3, U-9,
Y-3, Y-6, Y-11, and Y-18 PBU
Gentlemen:
Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above named wells. These contain our proposals to
convert them from oil wells into water injection wells.
Yours very truly,
Michael D. Martin
Sr. Petroleum Engineer
MDM: .j~CH:kkm
081 985:0639N
Enclosures
cc' T. N. Tyler
Well Records (LR2-1)
Well File #17
(" STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED W E L LYi~I
OTHER []
2 Name of Operator
SOHIO Alaska Petroleum Company
3 Address
P. 0, Box 6612, Anchorage, Alaska 99502
4 Location of Well
At Surface:
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
7 Permit No
80-2
8 APl Number
5oq)29-20431
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-6 (23-28-11 -13 )PBU
1 1. Field and Pool
Prudhoe Bay
5 Elevation in feet (mndmcate KB, DF, etc ) 6 Lease Desmgnatlon and Serial No
_ KBE : 81.26' AMSL ADL 28287 P~urlhne I')!l Pool
12 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF
(Submit m Triplicate) (Submit m Duplicate)
Perforate [] Alter Casmg [] Perforations [] Altermg Casmg
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulhng Tubmg []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent details and g~ve pertinent dates, ~dclud~ng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
With reference to the previous Sundry Notices dated: July 16, 1980;
August 19, 1980; April 27, 1985; and July 3, 1985, for the perforation of Y-6 in
the 7" liner~ it is intended to convert this Prudhoe Bay production well into a
seawater injection well 'for WPWZ Waterflood Project. Water will be injected
through perforations (4 spf) at'
10760' -- 10772' BKB
10782' -- 10800' BKB
10820' -- 10840' BKB
10850' -- 10920' BKB
14~1 hereby certify that the foregomg ~s true and correct to the best of my knowledge
The space below for Commission use
Conditions of Approval, ~f arly , ~
Returned
B~ ~ ~. ~E~ ByOrderof
Approved by COMMISSIONER the Commission
Form 10-403
Rev 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" m Dupl.cate
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TE:Q%CO
(-Marathon) MOBIL
PHILLIPS
STATE-OF AK !
BPAE
3 1 1 1 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907i 265-0000
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 8-15-85
T#: 76386
REFERENCE.
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge rece,pt by signing a
copy of this letter and returning it to this office:--
Y-3
Y-6
Y-18
Temp Log 7-22-85 9050-9720 Camco #1 5"
DFT 7-29-85 10600-11357 Camco #1 5"
DFT 7-27-85 10750-11400 Camco #1 5"
RECEIVED
~U~ Z ?~ echnical Documentation
Records ~nagement
0~I & ~s Cons Commlsslor,
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE {907) 265-0000
MAIL POUCH 6-61 2
ANCHORAGE. ALASKA 99502
Date:
T#:
08/02/85
76355
REFERENCE'
SOH.I~AL DATA- PRESSURE SURVEY DATA.
coy fOoiiOwing material is being submitted herewith. Please acknowledge receipt by signing a
f this letter and returning it to this office:--
A-7 ~' Flowing Gradient 07/28/85 Camco
A-10~- " " 07/19/85 Camco
X-i-" " " 07/26/85 Camco
X-2-- " " 07/24/85 Camco
X-14~ " " 07/14/85 Camco
Y-6'" Static Gradient 07/29/85 Camco
~ " " 07/27/85 Camco
Y-18 ·
RECEIVED
DATE
~ ~ ~~~a Aldridge LR2-1
_ Records
- ~ - ~O~iT/~ssiO,, Management
Alask;~ Olt & Gas ConS.
kn~,horzge
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
July 3, 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-6 (23-28-11-13) PBU
Gentlemen:
Enclosed, in duplicate, are the following forms for the above-named
well:
1. Form 10-407, Completion Report;
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
Yours very truly,
JAB:~H:elw ~D~strict etroleumEngineer (Acting)
Enclosures
cc: T. N. Tyler
Well Records (LR2-1)
Drilling Well File ~17
RECEIVED
J U L 0 9 1985
A~aska 0il & Gas Cons. Commission
Anchorage
' £ STATE OF ALASKA /
W-LLE ALASKA~,_ ,L AND GAS CONSERVATION CCi,, .MISSION
COMPLETION OR RECOMPLETION REPORT AND LO
1 Status of Well Classff,catlon of Service Well ~"/~
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of Operator 7 Permit Number
Sohio Alaska ?etroleum Company 80-2
3 Address 8 APl Number
P.O. Box 6612 Anchorage, Alaska 99502 50-029-20431
4 Location of well at surface 9 Unit or Lease Name
1318'SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM Prudhoe Bay Unit
At TopProduc~ng Interval 10 Well Number
1950'NSL, 3802' WEL, Sec. 28, TllN, R13E, OPM Y-6 (23-28-11-13) ?BO
At Total Depth 11 F~eld and Pool
2218'NSL 3699' WEL, Sec. 28, TllN, R13E, UPM
5 Elevauon In feet (~nd~cate KB, DF, etc ) 6 Lease Designation and Semal No Prudhoe Bay
KBE = 81.26' AMSL ADL 28287 Prudhoe Oil Pool
12 Date Spudded2/2/80 13 DateT D Reached3/4/80 14 Date Comp, Susp or Aband8/1/80, 115 Water Depth' ff °ffsh°re 116 N° °f c°mpleti°nsfeet MSL one
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+'i'VD) 19 Direct~onal Survey I 20 Depth where SSSV set 21 Thickness of Permafrost
[1643'MD'9621'TVD 11593'MD 9581 'TV~YES [] NO []I 2026 feetMD 2050'
22 Type Electmc or Other Logs Run
)IL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, Cyberlook
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
)-0" x 30" Insulate,[ Conduct()r Surface 110' 36" 12 cu. yds. Arcticse' concrete
13 3/8" 72# L-80 Surface 2689' 17 1/2' 3854 cu. ft. ?ermafrlst
9 5/8" 47# L-80 Surfac~_ 10467' 12 1/4"1518 cu. ft. Class G: 130 cu. ft.
Permafrost
7" 29# L-80 9962' 11637' 8 1/2''~ 460 cu. ft. Class G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
~nterval, s~ze and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD)
?rudhoe Oil Pool Top: 10760' 8854' 4 1/2" 10019~ 9912~
Bottom: 10920' 8974'
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
10760'-10772' BKB (8854'-8863' TVDss) DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED
10782'-10800' BKB (8871'-8884' TVDss)
10820'-10840' BKB (8899'-8914' TVDss)
10850'-10920' BKB (8922'-8974' TVDss)
27 PRODUCTION TEST
Date F~rst Production I Method of Operation (Flowing, gas lift, etc )
8/1/80I Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD
Flow Tubing Camng Pressure CALCULATED.~. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press 24-HOUR RATE "~
28 COP E DATA
Bmef description of I~thology, porosity, fractures, apparent d~ps and presence of o~1, gas or water Submit core ch~ps
RECEIVED
JUL 0 9 1985
Alaska 0ii & Oas Cons.
.,
Form 10-407 ~' h ~,..rlc.oraye Subm.t ~n duplicate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
29 , 30
GEOLOGIC MARKERS FORMATION TESTS
NAME Include mnterval tested, pressure data, all fluids recovered and gravity,
MEAS DEPTH TRUEVERT DEPTH GOR, and tlme of each phase
BKB Subsea
Sag River SST 10622' 8752'
Shublik 10657 ' 8778'
Ivishak 10750' 8847 '
·
31 LIST OF ATTACHMENTS
.....
32 I hereby certify that the foregoing m true and correct to the best of my knowledge
~ d~ , .~~~ Acting District
S~gne T~tle Petroleum En§inee~bate
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases ~n Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
( STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION CO'M MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL []
OTHER []
2 Name of Operator 7 Permit No
Sohio Alaska Petroleum Company 80-2
3 Address 8 APl Number
P.O. Box 6612, Anchorage, Alaska 99502 50-029-20431
4 Location of Well
At Surface:
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
5 Elevation in feet (indicate KB, DF, etc )
KBE = 81.26' AMSL
12
Lease Designation and Serial No
ADL 28287
9 Unit or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-6 (23-28-11-13) PBU
11. F~eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
{Submit ~n Triplicate) (Submit ~n Dupl,cate)
Perforate [] Alter Casing [] Perforations ['~ Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repa,r Well [] Change Plans [] Repairs Made [] Other []
Pull Tub,ng [] Other [] Pulhng Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, includ~ng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following additional interval was perforated June 4, 1985 using Gearhart
3 1/8" carrier guns at 4 s.p.f.
A lubricator was installed and tested to 3500 psi on all well work.
10850'-10920' BKB (Ref. BHCS/GR, 3/4/80)
An SSSV was set and tested in the ball valve nipple at 2026',.
RECEIVED
JUL 0 91~
ereby cert,fy that the foregoing ,s true and correct to the best of my knowledge Alaska 0il & Gas Cons. C0mrnissio.
~ ~~~n~ Acting District Anchorage
~ T,tle Petroleum Engineer Date
pa~elow for Comm,sslon use~ ~ ~.~ /~ ~
The s
Cond~o~ of Approval, ~f any
By Order of
Approved by COMMISSIONER the Commmmon Date __
Form 10-403
Rev 7-1-80
Submit "Intentions" ~n Tr~phcate
and "Subsequent Reports" m Duphcate
O( STATE OF ALASKA ~~~,
,ON'r--: ALASKA ,g. AND GAS CONSERVATION CO~,,~llSS'O'
HLY REPORT OF DRILLING AND WORKOVER OPERATION
Drdl,ng well [] Workover operation []
Name of operator 7 Permit No.
Sohio Alaska ?etroleum Company 80-2
Address 8 APl Number
P.O. Box 6612, Anchorage, Alaska 99502 50-029-20431
4 Loc. at,on of Well
at surface
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
5 Elevation in feet (ind,cate KB. DF, etc ) 6 Lease Designation and Se.al No
KBE = 81.26' AMSL ADL 28287
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well No
Y-6 (23-28-11-13) PBU
11 Field and Pool
?rudhoe Bay
Prudhoe Oil Pool
For the Month of. June ,1985
12 Depth at end of month, footage drilled, flshmg jobs, d,rect,onal dr,lhng problems, spud date, remarks
13 Casing or hner run and quantities of cement, results of pressure tests
14 Cormg resume and brief descrlpnon
15 Logs run and depth where run
1 6 DST data, perforatmg data, shows of H2S, miscellaneous data
See Attached.
RECEIVED
J U L 0 9 1085
Alaska 0~l & Gas Cons. C0mmlssi0n
Anchorage.
l(~hereby certify that the foregomg ts true and correct to the best of rn'y knowledge
Acting District
MOTE
ED TITLE Petroleu__m Enginee__r DATE
!--R~~ reclu~red for eact~dar month, regardless of the status of oPerat,ons, and must be f,,~(~ ,n ~/u~,cate w,th ,he Alaska
Od and G~ C~nservatmon Commission by the 15th of the succe~mng month, unless o~herw~se d~r~ted
Form 10~ Subm)t m duphcate
Rev 7-1-80
(
PERFORATING DATA - Well Y-6 (23-28-11-13) PBU
June 4, 1985:
June 10, 1985:
Rigged up Gearhart and perforated the
following additional interval using
3 1/8" carrier guns at 4 spf:
10850'-10920' ~B (Ref. BHCS/GR, (3/4/80)
Put well on production.
Set and tested SSSV in ball valve nipple
at 2026'
Well on production.
RECEIVED
JUL 0 9 1~85
Alaska Oil & Gas Cons. Comm~ss~o~,
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
May 9, 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Wells B-16, N-12, Y-3, Y-5 and.Y-6 PBU
Attention: Mr. C. V. Chatterton
Gentlemen:
Enclosed, in duplicate is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our subsequents to
performing EDTA treatments on these wells.
Yours very truly,
J. A.
Bragg
District Petroleum Engineer (Acting)
Encl6sure
cc: A. E. Les ke
Well Records (LR2-1)
Drilling Well File #17
I ECEIVED
MAY 1 5 1985
Alaska 011 & Gas Cons. Commission
' Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL
OTHER []
Name of Operator
Sohio Alaska Petroleum Company
3. Address
?.0. Box 6612, Anchorage, Alaska 99502
4. Location of Well
At Surface:
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
5. Elevation m feet (in~d~:ate KB, DF, etc )
KBE = 81.26 AMSL
12.
Lease Designation and Ser,al No
ADL 28287
8 APl Number
5o_029-20431
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
¥-6(23-28-11-13) PBU
11. F,eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate I--I Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note. Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion )
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170).
The following intervals in this well were treated with 100 barrels of EDTA solution on
May 3, 1985. The treatment was conducted through coiled tubing as a single stage
job and the well was shut in for 24 hours after the treatment. The SSSV was removed
prior to stimulation and reset after the job at 2026'.
10,760' - 10,772' BKB (Ref. BHCS/GR, 3-04-80)
10,782' - 10,800' BKB ( " )
10,820' - 10,840' BKB ( " )
RECEIVED
MAY 1 5 19 5
N~sk~ Oit & Gas Cons. Commission
Anchorage
I hereby certsfy that the foregoing is~t[ij~.a/~d correct to the best of my knowledge
T,tle Petroleum Engineer
space below for Corem,ss,on use
Conditions of Approval, if any
By Order of
Approved by, COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1
Submit "Intentions" m Trlphcate
and "Subsequent Reports" in Duphcate
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P O BOX 6612
ANCHORAGE, ALASKA 99502-0612
April 25, 1985
Alaska Oil and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Wells A-3, A-8, A-IiI A-27, B-91H-9,
Y-3, Y-5, Y-6, Y-11~ Y-18
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our proposals to
perforate additional intervals in these wells.
Yours very truly,
ActingBDistrict Petroleum Engineer
JAB/~'H~/jmw
Enclosures
cc: A. E. Leske
Well Records (LR2-1)
Drilling Well File ~17
RECEIVED
APR 0 1985
Alaska 0il & Gas Cons. Commission
Anchorage
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL []
OTHER []
2 Name of Operator
Sohio Alaska Petroleum Company
3 Addre~
Pouch 6-612, Anchorage, Alaska 99502
4 Location of Well
At Surface:
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
5 Elevation m feet (indicate KB, DF, etc )
KBE = 81.26' AMSL
12
Lease Deslgnat,on and Serial No
ADL 28287
7 Permit No
80-2
8. APl Number
50- 029-20431
9 Unit or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-6 (23-28-11-13) PBU
11 F,eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF'
(Submit ~n Tnphcate)
Perforate [] Alter Camng [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tub,ng [] Other [] Pulhng Tubing
(Note Report mult,ple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
(Submit in Duplicate)
[] Altemng Casing []
[] Abandonment []
[] Other []
13 Descmbe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~nclud~ng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following additional interval will be perforated in May/June, 1985.
A lubricator will be installed and tested to 3500 psi for all well work.
10850' - 10920' BKB (Ref. BHCS/GR, 3-4-80)
An SSSV w~ll be set and tested in the ball valve nipple at 2026'.
ereby cert,fy that the foregoing ,s true and correct to the best of my knowledge
~~ Acting District
~ T,tle Petroleum Engineer
spa(~elow for Commlss,on use
Condm{~s of Approval, ~f any
Date
Approved by
Approved Copy
Returned
By Order of
COMMISSIONER the Commlsmon
Form 10-403
Rev 7-1-80
Submit "Intentions" tn Trlphcate
and "Subsequent Reports" in Duphcate
SOHIO ALASKA PETROLEUM COMPANY
ANCHORAGe:, ALASKA 99502-0612
March 26, 1985
Alaska Oil and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
wells A-3¢ A-16¢ Y-3 and Y-6 PBU
Attention: Mr. C. V. Chatterton
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells for the above-named wells. These contain our proposals to
perform EDTA matrix treatments on these wells.
JAB/~jmw
Enclosures
Yours very truly,
D;s~;icB~agPgetroleum Engineer (Acting)
cc: A. E. Leske
Well Records (LR2-1)
Drilling Well File ~17
RECEIVED
2 9 1985
Alaska 0il & Gas Cons. Commls'.'~on
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
I DRILLING WELL [] COMPLETED WELL [] OTHER []
2 Name of Operator
Sohio Alaska Petroleum Company
3 Address
P, 0, Box 6612, Anchorage, Alaska 99502
4 Location of Well
At Surface:
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
5 Elevat,on ,n feet hnd,cate KB, DF, etc ) 6 Lease Designation and Semal No
KBE = 81.26' AMSL ADL 28287
7 Permit No
80-2
12
8 APl Number
50-029-20431
9 Umt or Lease Name
Prudhoe Bay Unit
10 Well Number
Y-6 (23-28-11-13) PBU
11 Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF.
(Submit mn Trlphcate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
[] Other [] Pulhng Tubing []
Pull Tubing
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludlng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals in this well will be treated with 100 Bbls of EDTA
solution during April/May, 1985. The treatment will be conducted through
coiled tubing as a single stage job and the well will be shut-in for 24 hours
after the treatment. The SSSV will be removed prior to stimulation and reset
after the job at 2026'.
10,760'-10,772' BKB (Ref. BHCS/GR, 3-04-80)
10,782'-10,800' BKB ( " )
10,820'-10,840' BKB ( " )
gnlehereb¥ certify that the foregoing ~s true and correct to the best of my knowledge
~/~ ~. ~ Acting District
d T,tle Petroleum Engineer
J L/l-he spj~e below for Comm lss,on use~ (/
lVlC°nd'~nsof Approval, If any Approved Copy
R®turne~
sinai, /-cL ....
Approved by COMMISSIONER the Cornmms~on
Form 10-403
Rev 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TEXACO
~o SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 1907) 265 0000
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 12/28/84
CC#: 75949
BPAE (Transmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
REFERENCE
. ~ FINAL DATA- PRESSURE SURVEY DATA
~/The following mate.al ~s being submitted herewith Please acknowledge receipt by s~gmng a
copy of th~s letter and returmng ,t to th~s off,ce --
A-23
Y-2
BHPD Sheet & ?BU Survey 11/03/84 GO
BHPD Sheet & PBU Survey 10/27/84 GO
BHPD Sheet & PBU Survey 10/26/84 GO
(4/82)
RECEIVED
DATE
TPi-1
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
STATE OF ~AK
!
BPAE
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL POUCH6 612
ANCHORAGE. ALASKA 99502
Date: 12/12/84
CC#: 75926
CENTRAL FILES (CC# ' s-Transmittal Only)
REFERENCE
CASED HOLE FINAL LOGS
/The following mater,al ,s be,ng submitted herew,th Please acknowledge rece,pt by s,gn,ng a
(../ copy of this letter and returning It tq thts office:--
iA-4
/B-7
/B-10
/C-8
,,E-2
/I{-7
/Y-6
CH-CN~ 11/7/84 #11 10300-10993 Sch 5"
CH-CNL 11/9/84 ~9 10800-12053 Sch 5"
CH-CNL 11/11/84 #2 10000-10748 Sch 5"
CH-CNL 11/6/84 #13 9450-10211 Sch 5"
CH-CNL 11/8/84 ~.6/~~ 9150-9955 Sch 5"
CH-CNL 11/10/84 #13 9900-10950 Sch 5"
Cont. Flow Survey 10/21/84 #1 11000-11320 GO 5"
Cont. Flow Survey 10/27/84 #1 10100-10550 GO 5"
Cont. Flow Survey 10/26/84 #1 10600-10900 GO 5"
[1/84)
RECEIVED
DAT( _ _ 19
Victoria Aldridge TPI-1
Development Geology
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
GETTY
TO SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE OF AK
BPAE (Transmittal Only)
CENTRAL FILES(CC#'s-Transmittal Only).
311 ] C STREET
ANCHORAGE ALASKA
TELEP,~O ,~L (90 7) 265 0000
MAIL POUCH 6 {512
ANCHORAGE. ALASKA 99 502
Date' 8/19/83
CC#.74666
REFERENCE
$/~H~O CASE_____qD HO____LE FINAL LOGS
VThe mater,al ,s be,ng submitted herew,th Please acknowledge rece,pt by s~gn,ng a
folJow~ng
copy of th~s letter and returmng ~t to th~s off~ce -
SFO/UNIT/STATE:
X-14
B-10
F-18
N-10
Y-6
GEL 6/18/83 #3 11151-12202 Sch 5"
DFT 7/30/83 #1 10100-10761 Camco 5"
DFT 8/2/83 #1 11950-12450 Camco 5"
DFT 8/4/83 #1 10250-10580 Camco 5"
DFT 7/31/83 #1 9900-11577 Camco 5"
(4/82)
RECEIVED
DATE
-- a Aldridge TP1-5
'~ .... , Development Geology
, ~9 Well Records
SOHIO ALASKA PETROLEUM COMPANY
o
SF0
ARCO
- CHEVRON
311 ~ ' C ' SI~qEET
ANCHORAGE ALASKA
TELEPHONE I907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
~o SFO/UNIT/STATE:
(-Marathon)
E~XON
GETTY
MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only) _
CENTRAL FILES (CC#'s - Transmittal Only)
7/26/83
Date:
Trans.#: -
74603
CC#:
REFERENCE:
SO~I~FINAL DATA - PRESSURE SURVEY DATA
/- ./~e following material ts be,ng subrnltted herew,th. P~ease ackno~v~edge receipt by signing a
~./ copy of th,s letter and returmng it to thIs office:--
A-29/ BHPD & Pressure Analysis 6/01/83 Camco
B-18'-'~ Pressure Survey 7/07/83 Otis
B-19v " " 7/05/83 Otis
B-20'" " " 7/09/83 Otis
B-21~ HP Pressure Analysis 7/11/83 Camco
B-22- t " " " 7/03/83 Camco
B-23~j " " " 6/25/83 Camco
D-6~ Pressure Survey 7/12/83 Otis
G-3 ~' " " 7/12/83 GO
Q-3~ HP Pressure Analysis 7/07/83 Camco
R-10 z~ HP Pressure Analysis 7/08/83 GO
R-16/ BHPD & Pressure BU Survey 6/6-7/83 Dres
X-3~ BHPD & Pressure Analysis 6/20/83 Camco
X-9/ BHPD & Pressure Survey 6/04/83 GO
X-16/ BHPD & Pressure Survey 5/18/83 Otis
X-17z Pressure Survey 5/11/83 Otis
X-17 BHPD 5/24/83 Otis
X-17 Pressure Survey 5/22/83 Otis
Y-2~ BHPD & HP Pressure Analysis 5/15/83 Camco
Y-6/ Pressure Data 7/07/83 GO
4/82)
RECEIVED
DATE
Victoria Aldridge
Development Geology
Well Records TP1-5
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99502
~o SFO/UNIT/STATE:
(-Marathon)
EXXON
GETTY
MOBIL
PHILLIPS
STATE OF AK
BPAE (Transmittal Only) _
CENTRAL FILES(CC#'s-Transmittal Only).
Date: 10/12/82
Trans.#: 27 29
CC#: 55729
REFERENCE'
SOHIO~D HOLE~ FINAL LOGS
f lowing mate.al ~s bemg submItted herewith. Please acC. nowledge receipt by signing a
thIs letter and returning it to th~s office.--
SFL/UN,IT/STATE ONLY:
M-16/ TDT-M 8/31/82 #1 11740-11685 Sch 5"
A-19~ TDT-M 8/28/82 #1 8850-9767 Sch 5"
Y-6'' Spinner 8/11/82 #1 10900-10441 GO 5"
E-11~ Spinner 8/31/82 #1 10300-10661 Otis 5"
R-8--- Spinner 9/13/82 #1 10900-11250 Otis 5"
E-i~~ Spinner 9/10/82 #1 10250-10672 Otis 5"
A-19j EPL 8/29/82 #1 8950-9300 Sch 5"
G-7j PAL 8/26/82 #1 0-9730 Sch 5"
C-14j PAL 9/5/82 #1 0-10300 Sch 5"
G-7¢~' ETT 8/26/82 #1 2590-9730 Sch 5"
G-7~' Tubing Cutter 8/23/82 #1 --- Sch
E-10/ Completion
Report 9/2/82 #1 10100-11688 Sch 5"
(4/82)
RECEIVED .....
DATE
..... ~'~'¢ ~ ~',-:-:~o'." Victoria Aldridge
Development Geo ]ogy
~?,'"!.:.~.,_,__,~_ ~9 ~ Well Records TP1-5
_ - _
,;
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
GETTY
~o SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
BPAE (Transmittal Only)
3111 "C"SIREET
ANCitORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL.: POUCH 6-612
ANCHORAGE. ALASKA 99502
CENTRAL FILES (CCfl's - Transmittal Only)
REFERENCE:
O FINAL DATA- PRESSURE SURVEY DATA.
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
A-12/ Pressure Survey & BHPD
A_10/ ,, ,,
A-ii/ " "
A_16~, ,, ,,
A-17 / " "
B-16 / " "
H-8 .' " "
J_lO/ " ,,
y_6/ " ,,
N-15" Pressure Survey
R_3/ ,,
E-7' Pressure Survey & BHPD
M-15-~ Pressure Survey & BHPD
A-18 z'- " "
M_16~/ ,, ,,
R_7/ ,, ,,
R-8 / " "
Y-11 / " "
7/25/82 Dres.
7/31/82 GO
7/24/82 GO
7/24/82 GO
7~28~82 GO
7/27/82 GO
8~4~82 co
8/13/82 GO
8/11/82 CO
8/10/82 CO
8/6/82 Sch
7/23/82 Sch
8/13/82 Camco
8/14/82 Camco
8/15/82 Camco
8/7/82 Camco
8/11/82 Camco
7/27/82 Camco
32)
RECEIVED
DATE
Al~,k~ ()il & (~ r,,,r,~, ~' ...... Karen Mestas
AllLhOrage Development Geology
~ Well Records
SOHIO RESTRICTED
SOHIO ALASKA PETFIOLEUM COMPANY
ARCO ,
TO SFO/UNIT/STATE: Mo~l ,
(-Marathon)
~ll,[~ __ - ....
BPAE T_ra. nsm,ittal Only _
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (9071 265 0000
MAIL. POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 3/9/82
1417
REFERENCE
SOHIO FINAL DATA CASED HOLE FINAL LOGS
The following mater~al IS being submitted herewith. Please acknowledge receipt by s,gning a
copy of this letter and returmng It to this office:--
B-6
H-4
H-4
Y-6
Spinner #2 2/19/82 (Otis)
Flowmeter(CFS) #1 1/16/82 (Go)
Flowmeter(CFS) #1 2/5/82 (Go)
Hydro Log #1 2/1/82 (Go)
8800-9150 5"
11400-11810 5"
11400-11810 5"
9900-10900 5"
Carol ,.Wrieter
Deve!o.~ment G-to_~
We ll.j~.e ccrd z
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C" STREET
ANCHORAGE, ALASKA
SOHIO-BP ALASKA PRODUCTION DIVISION
TO-
REFERENCE:
SFO ,
ii
i · i ~_
il i ii ·
i --
-- ~
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
/H~O CASED HOLE FINAL LOGS
~T,,h,,e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Flowmeter 12/3/80 #1 9700-10050
Flowmeter 12/9/80 #1 10450-10900
11
Joanne Woods for
Carol Krieter
Well Records
DATE
SOHIO PETROLEUM COMPANY
D~vision of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO'
SFO/UNIT/STATE:
(-Marathon)
OMN~
COMM
COMM
---R'~.5 U,'4G / 3111 "C" STREET
] ENO 4NCHORAGE ALASKA
--~-ENO --'J '
:~-cN.~ TEJI_EPHONE (907) 265-0000
-4 ENG---J MAIL: POUCH ~612
_ 1 OEOLANCJHORAGE ALASKA 99502
/80 #526
REFERENCE
~"~-Sl~t~ ~- ' :~' ~-_L _, J
SOHIO DATA
~The following material is being submitted herewith. Please acknowledge receipt by mgning a
copy of th~s letter and returning it to this office:-
Y-5 Bottom Hole Pressure Data Form and Survey 12/4/80
12/7/80
J. Woods for Carol Krieter
Well Records
DATE
Alaska 0il & Gr~q Cons. Commius~ud ~9 ~
SOHIO PETROLEUM COMPANY
,7
Division of Soh,o Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO
SFO/UNIT/STATE
(-Marathon)
REFERENCE.
Mobd ,
BFA~ ~,
SFO.
......
ANCHORAGE, A~ASKA
TELEPHONE (907t 265-0000''
MAI L: POUCH ~6-61:2
ANCHORAGE, ALA~!
GT~,~ TEC
9/26/80 11379
SOHIO FINAL CASED HOLE DATA
~~The following material is be,ng submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
C-7 Spinner 8/11/80 #1
D-5 Flowmeter 7/15/80 #1
D-8 Spinner 8/13/80 #1
D-9 TDT-M 7/18/80 #1
GC-3D Collar Log 8/7/80 #1
M-1 Spinner 8/18/80 #1
M-2 EPL 8/17/80 #1
X-2 EPL 8/21/80 #1
X-9 EPL 7/27/80 #1
X-9 EPL 7/31/80 #2
r'"'~ cch 8/1/80 #1
5~!
5"
5"
5"
5"
5"
2"
5"
5"
5~
Well Records
/2"/5"
/5"
DATE [ ....' 19 __
SOHIO ALASKA PETROLEUM COMPANY
August 20, 1980
! COA AA'Z'q,
~ IRES' EN~--
ENG_____
~HOr~ ~o~ d~ ~ EN~ '
MA~L POUCH 6-(~ GEOL
ANCHORAGE, ALASKA 9~5~O~
I 3 GEOL
CON~ID~N~IAD ~ STAT TE~
STAT TEC--
CONFER:
FILF:
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
Attn: Mr. H. H. Hamilton
Re: Wells GC-3D (30-11-14); D-10 (43-22-11-13); d~~Y-6 (23-28-_]_L=L3~-.-~
Gentlemen:
/
Enclosed please find, in duplicate, Forms 10-403, Sundry Notices
and Reports on Wells, and Forms 10-404, Monthly Report of Drilling
and Workover Operations for the above-referenced wells.
Very truly yours,
S~O ~OLEUM COMP32qY
GD~sJt;i~tl~SF~eald Engineer
GJP:JH:mlh
Enclosures
cc: S. R. Bundy
A. E. Leske
Drilling File
Geology
I='orrr~ 10-403
REV. 1-10-73
Submit "1 ntentlons" In Triplicate
& "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
WELL L_J OTHER
2. NAME OF OPERATOR
Sohio Alaska Petroleum Cc~pany
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL
At surface
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc..)
KBE = 81.26' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20431
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28287
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
Y-6 (23-28-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 28, TllN, R13E, UPM
12. PERMIT NO.
80-2
3ort, or Other Data
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
NOTICE OF INTENTION TO: - SUBSEC~UENT REPORT OF: -- - -
MULTIPLE COMPLETE FRACTURE TREATMENT /~LTERING CASING
ABANDON* SHOOTING'OR ACIDIZING ABANDONMENT*
CHANGE PLANS (Other)
(NOTEt Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, includmg estimated date of
starting any proposed work.
~ne follc~ing intervals were perforated August 1, 1980, using GO Int' 1. 3 1/8" carrier'
guns at 4 spf:
10,760' - 10,772'
10,782' - 10,800'
10,820' - 10,840'
(12') (Ref. BHCS/GR, 3/04/80)
(18') (" · " " )
(20') (" " " )
An SSSVwas set ar~ tested in the ball valve nipple ca. 2000'.
(T~ space for State office use) ~/~
APPROVED BY. TITLE
CONDITIONS OF APPROVAL, IF ANY:
DATE
See Instructions On Reverse Side
FormNo 10-404REV 3-1-70 ( SUBMITIN DUPLICATE (
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50-029-20431
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28287
1. 7. IF 'NDIAN'ALOTTEE OR TRIBE NAME
OIL ~ GAS []
WELL' ~-*-~ WELL OTHER
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Sohio Alaska Petroleum Company Prudhoe Bay Unit West
3 ADDRESS OF OPERATOR 9. WELL NO.
Pouch 6-612, Anchorage, AK 99502 Y-6 (23-28-11-13)
4 LOCATION OF WELL
At Surface:
1318' SNL, 5055' WEL, Sec.34, TllN, R13E, UPM
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11 SEC. T R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 28, TllN, R13E, UPM
12 PERMIT NO
80-2
July 21, 1980:
August 1, 1980:
August 7, 1980:
August 9, 1980:
August 9, 1980:
13. REPORT TOTAL DEPTH AT ENO OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Pressure tested tubing and inner annulus.
Rigged up G.O. International and perforated the following
intervals using 3 1/8" carrier guns at 4 s.p.f.:
10,760'-10,772' (12') (Ref. BHCS/GR, 3/4/80)
10,782'-10,800' (18') (" " ")
10,820'-10,840' (20') (" " ")
Put well on production.
Shut in well in preparataion for static pressure survey.
Ran static pressure/temperature survey at 8800' TVDss.
Set and tested insert sleeve and SSSV in ball valve nipple
ca. 2000'.
Well on production.
14. I hereby certl t a he foregol true and correct
SiGNE~ ~ TITLE DISTRICT FIELD ENGINEER DATE
NOTE-Report on th,s~form is required for each calendar month, regardless of the status of operations, and must be filed ,n duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
JH:mlh
SOHIO ALASKA PETROLEUM COMPANY
August 28, 1980
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-6 (23-28-11-13)
Enclosed, in duplicate, is Form P-7, Completion Report, for
the above-named well together with the Well History.
This well has been perforated and is now on production.
RHR:ja
Enclosures
cc: Well File #17
Geology
Yours very truly,
District Drilling Engineer
Form P--7
STATE OF ALASKA (see other In-
structions on
reverse side)
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
la TYPE OF WELL OwIELLL~'~ GAS I-"1
WELLI I DRYD Other
b TYPE OF COMPLETION
NEW ~ WORK DEEP-I---I PLUG ~ DIFF
WELLI~I OVER [---] EN I I BACKI I RESER D Other
2 NAME OF OPERATOR
Sohio Alaska Petroleum Company
3 ADDRESS OF OPERATOR
Pouch 6-612, Anchoraqe, Alaska 99502
4 LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
Atsurface 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, OPM
At top prod interval reported below
At total depth
5 APl NUMERICAL CODE
50-029-20431
6 LEASE DESIGNATION AND SERIAL NO
ADh 28287
7 IF INDIAN, ALLOTTEE OR TRIBE NAME
8 UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9 WELL NO
¥-6 (23-28-11-13)
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil
11 SEC, T, R, M, (BOTTOM HOLE
OBJECTIVE)
1950' NSL, 3802' WEL, Sec. 28, TllN, R13E, UPM
2218' NSL, 3699' WEL, Sec. 28, TllN, R13E, UPM
Pool
Sec. 28, TllN, R13E, UPM
12 PERMIT NO
80-2
2/2/80 3/4/80 8/1/80 KBE
18 TOTAL DEPTH MD & TVD/19 PLUG BACK MD & TVDI20 IF MULTIPLE COMPL
l1643'ND $621'TV~ lig~§'~D 9581'~VDIHOW MANY° '
22 PRODUCING INTERVAL(S), OF THIS COMPLETION - TOP, BOTTOM, NAME {MD & TVD)*
Prudhoe Oil Pool Top: 10760'ND 8935'TVD
Bottom: 10840 'ND 8995 'TVD
ELEVATIONS (DF, RKB, RT, GR, ETC)* 117 ELEV CASINGHEAD
I
= 81.26' AMSL I 51.76' AMSL
i
21 ROTARY TOOLS INTERVALS iDRILLED BY CABLE TOOLS
Total
23 WAS DIRECTIONAL
SURVEY MADE
Yes
24 TYPE ELECTRIC AND OTHER LOGS RUN
DIL/SP/GRf BHCS/GRf FDC/CNL/GR/Cal~ C~;berlook
25 CASING RECORD (Report all strings set In well)
CASING SIZE
20"x30"
13 3/8"
9 5/8"
7"
WEIGHT, LB/FT / GRI
Insulated C~ndt
72# /L-~
47~ n-~
29# n_(
,DEI DEPTHSET(MD)
lct~r 110'
;0 ! 2689'
;0 ! 10467'
I0 19962-11637'
HOLE SIZE I CEMENTING RECORD / AMOUNT PULLED
36" ~12 cu.yds. Arcticset concrete
17 1/2'13854 cu. ft. Permafrost
12 1/4'I1518 cu,ft. Class G;130cu[ft. Permafrost
8 1/2'~ 460 CU. ft. Class G
26 LINER RECORD
SIZE I TOP (MD) BOTTOM {MD) SACKS CEMENT*
I
28 PERFORATIONS OPEN TO PRODUCTION (Interval, size and number)
! 10760-10772 'BKB 0.5"@4spf (Ref. BHCS/GR, 3/4/80)
~_10782-10800 'BKB " " ( " )
310820-10840' BKB " " ( " )
274 I TUBING RECORD
SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
1/2" 10019 ' 9912 '
29 ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) I AMOUNT AND KIND OF MATERIAL USED
30 PRODUCTION
/DE-J~ODUCTION IPRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) STATUS (Producln§ or
iww,,
1/8~0 '~ I Flowing Is"ut''n) Producing
D'A"I'~'-OI~TEST !HOURS TESTED ICHOKE SIZE I PROD'N FOR OI L-BBL
FLOW TUBING CASING PRESSURE ~ CALCULATED OIL--BBL GAS--MCF
., .~, ~.~ ~1 ~:~
I
32 LIST OF ATTACHMENTS ~ ~[,~':",., ~)t~ ~ L, ~ ............ '
Well History f:' ,~,'he, -,?','
33 I hereby certify th~he fore~goln~tion is copnplete and correct as determined from all available records
SIGNED t~~ TITLE District Drilling Rngineer
R. H .-Reile~; ~
*(See instructions and Spaces for Additional Data on Reverse Side)
DATE
INSTRUCTIONS
General' This form ~s designed for submitting a complete and correct well completion report and log on all types of
lands and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given
other spaces on th~s form and ~n any attachments.
Items 20, and 22: If th~s well is completed for separate production from more than one Interval zone (multiple com-
pletion), so state in ~tem 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s)
(if any) for only the ~nterval reported in item 30. Submit a separate report (page) on this form, adequately identified,
for each additional ~nterval to be separately produced, showing the additional data pertinent to such interval.
Item 26: "Sacks Cement" Attached supplemental records for this well should show the details of any multiple stage
cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction
for items 20 and 22 above).
34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS,
35 GEOLOGIC MARKERS
WATER AND MUD
NAME
MEAS. DEPTH TRUEVERT DEPT
BKB Subsea
Sag River SST. 10622' 8752'
Shublik 10657' 8778'
Ivishak 10750' 8847'
36 CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER.
WELL Y-6 (23-28-11-13)
WELL HIS%~DRY
DRILLING
February, 1980
Spud well at 0515 hours, February 2, 1980. Drilled 17 1/2" hole to 2715'. Ran
69 jLs. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 3854 cu.ft.
Permafrost cement. Installed and tested BOPE. Cleaned out to 2647', tested
casing to 3000 psi. Drilled out shoe, ran leak-off test. Directionally drilled
12 1/4" hole to 10474'. Ran open hole logs. Ran 268 its. 9 5/8" 47# L-80
Buttress casing to 10467'. C~ted in ~o stages: First stage with 1518 cu. ft.
Class G cement; second stage through D.V. packer at 2596' with 130 cu.ft.
Permafrost cement preceded byArctic Pack. Cleaned out to 10467', tested casing
to 3000 psi. Drilled out to 10497', performed formation co~mpetency test.
Directionally drilled 8 1/2" hole to 10667'.
March, ]980
Directionally drilled 8 1/2" hole to 11643'. Ran open hole logs. Ran 42 jts.
7" 29# L-80 Buttress casing to 11637'. Cemented with 460 cu. ft. Class G cement.
Cleaned out to 11593', tested casing to 3000 psi. Changed well over to NaC1.
Ran CBL. Ran 316 jts. 4 1/2" 12.75# L-80 CS Hydril tubing to 10019'. Landed
tubing with ball valve at 2027'. Installed and tested tree. Displaced tubing
to diesel. Set packer at 9912', tested tubing to 3500 psi. Released rig at
1330 hours, 3/12/80%
PEPJ'ORATING
August, 1980
The following intervals were perforated August 1, 1980 using GO Int'l. 3 1/8"
carrier guns at 4 s.p.f.:
,
10760' - 10772' (12') (Ref. BHCS/GR, 3/4/80)
10782' - 10800' (18')( " )
10820' - 10840' (20')( " )
A SSSV was set and tested in the ball valve nipple ca. 2000'.
SOHIO ALASKA PETROLEUM COMPANY
July 15, 1980
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
Attn: Mr. H. Hamilton
Subject: Wells D-10, C-14, C-15, X-5, Y-6
3111 'C" STREE]~'--i ,- .. -'"-
/ I I
MAIL: POUCH 6-6i2 J 4
IS'rAT
FI[F: -' '
Enclosed please find in triplicate form 10-403, Sundry Notices
and Reports on wells for the above referenced well.
Enclosures
CC:
S. R. Bundy
A. E. Leske
Drilling File
Very truly yours,
SOHIO PETRD~ CO.
District Field Engineer
Forr~ ;~3-403
"REV. 1-10-73
Submit "1 ntentlon$" In Triplicate
& "Subsequent Reports" In Duplicate
STATE O~ At.~SK~
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
OiL ~ GAS l---I
WELLI~-I WELL OTHER
2. NAME OF OPERATOR
Sohio A]aska Petroleum Cc~pan¥
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchoraqe, Alaska
4. LOCATION OF WELL
At surface
99502
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc_)
KBE = 81.26' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
5. APl NUMERICAL CODE
50-029-20431
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28287
7. IF INDIAN, ALLOI I EE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
¥-6 (23-28-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
Il. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 28, TllN, R13Er UPM
~2. PERM.T NO.
80--2
)OFt, or Other Data
SUBSEQUENT REPORT OF=
WATER SHUT-OFF [~ REPAIRING WELL
FRACTURE TREATMENTH ALTERING CASING
SHOOTING OR ACIDIZlNG ABANDONMENT*
(Otl~er)
(NOTE.. Report results of multiple completion on Well
Completion or Recomplet~on Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ~letells, and give pertinent dates, including estimated date of
starting any proposed work.
The follc~ing intervals will be perforated during July/August 1980 using GO Int'l. 3 1/8"
carrier guns at 4 spt:
10760' - 10772'
10782' - 10800'
10820' - 10840'
(12') (Ret. BHCS/GR, 3/4/80)
(18')( " )
(20') ( " )
A SSSV will be set and tested in the ball valve nipple ca. 2000'.
Subs~-q-ffe~t Worl< ~o~tecl ~. _
SIGNEI~II'~/ _~i TITLE District Field En~ineerq
~. ,7. ~_¥.~ ~ ..~,
{This space for State ~ff u~)
APPROVED BY TITLE
CONDITIONS O~PROVAL, I ~ ~Y: ~ ORDER
DATE
See Instructions On Reverse Side
DATE
Approved Copy
Returned
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TELEPHONE (907) 26
MAIL' POUCH 6-6
ANCHORAGE, ALASK,
FILF:
EXXON
6/20/80
#221
PHILLIPS
SFO
REFERENCE
SOHIO MAGNETIC TAPES
Jc h~e follow~ng mater~al ~s being submitted herewith. Please acknowledge receipt by mgn~ng a
opy of th~s letter and returning ~t to th~s office.-
C~-17 5/5/80 Tape ~60467
g-7 4/7/80 " #60420
g--8 ---4/27/80 " #60456
3/4/80 " #60336
Anne Barns
Well Records
~ SOHIO PETROLEUM COMPANY 3~ "c' STI~E',[.!_~--O_!.~.~.~
~ D,v,s,on of Sohio Natural Resources Company ANCHORAGE./~ .L-I~_ f~~4
TELEPHONE (907] 26§-0000'_-_-~..
..... _. __
SFO/UNIT/STATE
REFERENCE
SOHTO DATA
....
__ i J ~ Iii_ I _
j i i i~ j I_ I Ill
~dhl~ -- - " - --
~°AE _ , ,
-- JII I_ ! I _
5/8/80 #132
The material is. being submitted herew,th. Please acknowledge receipt by signing a
follow, ng
copy of this letter and returning it to th~s off~ce.-
SFO/UNIT/STATE: F-14
(-Marathon) ~
Temperture Log
Temperture Log
3/27/80 #1 5"
3/26/80 #1 5"
Well Records
SOHIO PETROLEUM COMPANY
Divmon of Sohio Natural Re~urce$ Company
3111 "C"STREET
ANCHORAGE, ALASKA
SOHIO-BP ALASKA PRODUCTION DIVISION
TO
SFO/UNIT/STATE
:~FO/UNIT/STATE
(-Marathon)
SFO/%YNIT/STATE:
TELEPHONE (907) 265 O000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
l~ll,~ .._ .._:. _~_. _
.
SFO :_---_ = _.._, ..... ,,_ j
~EFE~EN~E' '
SOHIO CASED HOLE FIN~ DATA
~oHomno material is ~in~ subm~ herewith. Please acknowl~ receipt b~ s~n~n~ a
cop~ of th~ iener and return~n~ it lo th~s o~ce:-
B-9 TDT-M
B-13 Diff. Temp.
B-16 Perf. CCL
C-15 Temp.
E-4 Spinner
H-7 Spinner
J-6 Spinner
M-1 Temp.
M-2 CCL
M-6 CCL
M-7 CCL
X-4 Mudlog
West Sak #14 Mudlog
FDC/CNL
4/24/80 t/114
3/23/80 #2
7/13/79 #1 5"
2/29/80 #1 5"
3/25/80 #1 5"
3/16/80 #1 5"
2/29/80 #1 5"
2/25/80 #1 5"
3/12/80 #1 5"
3/9-10/80 #1 5"
3/10-11/80 #1
3/13-14/80 #1 5"
12/25/79-1/23/80 (State only)
3/25/80-4/12/80 (State only)
3/4/80
#1 2"
%
Carol ~ieter
Well R&cords
19
DATE
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO
STATE OF ALASKA
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
/80 #099
REFERENCE:
SOHIO OPEN HOLE FINAL DATA
/"he following material is being submitted herewith. Please acknowledge receipt by signing
a
copy of this letter and returning it to this office:-
Y-6 DIL 2/25/80 & 3/4/80 #l&2 2" & 5"
Y-6 BHCS 3/4/80 #1 2" & 5"
Y-6 FDC 3/4/80 #1 2" & 5"
Y-6 FDC/CNL 3/4/80 #1 5"
Y-6 Gyroscopic Survey 3/26/80
~a~ol Kr£et~
Well Records
SOHIO ALASKA PETROLEUM COMPANY
April 9, 1980
Alaska Oil & Gas Conservation Cc~mission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
3111 "C" STREET ~/~
ANCHORAGE.
TELEPHONE {907)~5-0,
ANCHORAGE, ALASKA 9
! I sr,tT TE~
Gentlemen:
Well Y-6 (23-28-11-13)
Enclosed, in duplicate, is Form P-7, Completion Report,
for the above-named well together with the Well History,
Well Logs, and Directional Survey.
This well has been suspended pending perforating operations.
AMR:ja
Enclosures
cc: Well File #17
Geology
Yours very. truly,
Austin Reid
Acting District Drilling Engineer
RECEIVFD
F°r2 13--7 SUBMIT IN
~-TATE OF ALASKA
reverse side) 5 APl NUMERICAL CODE
el L AND GAS CONSERVATION COMMITTEE 50-029-20431
B LEASE DESIGNATION AND SERIAL NO
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
ADL 28287
la TYPE OF WELL OWIiELLL~ GASwELLi ir~ DRYD Other 7 IF INDIAN, ALLOTTEE OR TRIBE NAME
b TYPE OF COMPLETION
NEW ~ WORK DEEP- PLUG [~1 DIFF
WELLIAI OVER [~] EN [-"] RESER [~ Other
BACKI I 8 UNIT, FARM OR LEASE NAME
2 NAME OF OPERATOR Prudhoe Bay Unit
~o .~3.aska Petroleum ~y 9 WELL NO
3 ADDRESS OF OPERATOR Y-6 (23-28-11-13)
Pouch 6-612, Anchorage, Alaska 99502
4 LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
Atsurface 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM ~, SEC,T.R,M,(BOTTOMHOLE
OBJECTIVE)
At top prod interval reported belowtop of Sag Re SST.
1666' NSL, 3357' WEL, Sec. 28, TllN, R13E, UPM
At total depth
12 PERMIT NO
2218' NSL, 3699' WEL, Sec. 28, TllN, R13E, UPM 80-2
I DEPTH HOW MANY* ' 21 ROTARY TOOLS INTERVALS DRILLED BY CABLE TOOLS
11643'MD 9621'TVDI 11593'MD 9581'TVDI Total
22 PRODUCING INTERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* 23 WAS DIRECTIONAL
SURVEY MADE
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
Sec. 28, TllN, R13E, UPM
24 TYPE ELECTRIC AND OTHER LOGS RUN
DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, Cyberlook
25
CASING SIZE
20"x30"
13 3/8"
s7 "
7"
26
CASING RECORD (Report all strings set in well)
WE,GHT,'B/FT ! GRADE ~ DEPTH SET
Insulated Cbnductdr 110 '
72~ I L-801 2689'
I -s01
29# I ~-80 19962-11637'
LINER RECORD
SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT*
(Interval, size and number)
28 PERFORATIONS OPEN TO PRODUCTION
HOLE SIZE I CEMENTING RECORD / AMOUNT PULLED
I
/
36" 12 Cu.vds. Arcticset concrete
17½" 13854 c~.ft. PP_~n~frn.~f c~m~.nt.
27 TUBING RECORD
SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
4½" 10019 ' 9912 '
29 ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
DATE FIRST PRODUCTION
PRODUCTION
PRODUCTION METHOD (Flowing. gas lift, pumping--size and type of pump)
I WELL STATUS (Producing or
shut-In)
FLOW TUBING CASING PRESSURE RA~TE
PR ESS r
31 DISPOSITION OF GAS (Sold, used for fuel, vented, etc )
32 LIST OF ATTACHMENTS
Well History, Well Logs, Directional Survey
GAS--MCF WATER--BBL I GAS--el L RATIO
I\ IL, '~WI~Eh-~IB~[, L~ IO~LGRAWTV-Am (CORR)
I
;'~- ~ ~ 0 '~T WITNESSED BY
/
DATE
33 I hereby certify that the foregoing and attached Information Is coynplete and correct as. determined from all available records
EFW: i~sIGNEDAUSI~ ml(/' TITLE District Drilling Engineer
*(See instructwons and Spaces for Additional Data on Reverse Side)
INSTRUCTIONS
General: This form ~s designed for submitting a complete and correct well completion report and log on all types of
lands and leases in Alaska.
Item: 16: IndIcate which elevation is used as reference (where not otherwIse shown) for depth measurements given in
other spaces on this form and m any attachments.
Items 20, and 22: If this well ~s completed for separate production from more than one ~nterval zone (multiple com-
pletion), so state in ~tem 20, and in ~tem 22 show the producing interval, or ~ntervals, top(s), bottom(s) and name(s)
(if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified,
for each additional interval to be separately produced, showing the additional data pertinent to such interval.
Item 26: "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage
cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each ~nterval to be separately produced. (See ~nstruct~on
for items 20 and 22 above).
34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS,
WATER AND MUD 35 GEOLOGIC MARKERS
NAME
MEAS DEPTH TRUEVERT. DEPT
BKB Subsea
Sag R. SST. 10622' 8752'
Shublik 10657 ' 8778 '
Ivishak 10750 ' 8847' - ~'
36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER.
·
WELL Y-6 (23-28-11-13)
WELL HISTORY
Feb~nmry, 1980
Spud ~ell at 0515 hours, February 2, 1980. Drilled 17 1/2" hole to 2715'. Ran
69 jts. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 3854 cu. ft.
Permafrost cement. Installed and tested BOPE. Cleaned out to 2647', tested
casing to 3000 psi. Drilled out shoe, ran leak-off test. Directionally drilled
12 1/4" hole to 10474'. Ran open hole logs. Ran 268 jts. 9 5/8" 47# L-80
Buttress casing to 10467'. Cemented in two stages: First stage with 1518 cu. ft.
Class G cement; second stage through D.V. packer at 2596' with 130 cu. ft.
Permafrost cement preceded by Arctic Pack. Cleaned out to 10467', tested casing
to 3000 psi. Drilled out to 10497', performed formation competency test.
Directionally drilled 8 1/2" hole to 10667'.
March, 1980
Directionally drilled 8 1/2" hole to 11643'. Ran open hole logs. Ran 42 jts.
7" 29# L-80 Buttress casing to 11637'. Cemented with 460 cu. ft. Class G cement.
Cleaned out to 11593', tested casing to 3000 psi. Changed well over to NaC1.
Ran CBL. Ran 316 jts. 4 1/2" 12.75# L-80 CS Hydril tubing to 10019'. Landed
tubing with ball valve at 2027'. Installed and tested tree. Displaced tubing
to diesel. Set packer at 9912', tested tubing to 3500 psi. Released rig at
1330 hours, 3/12/80.
R£CE!VFD
, spepp -sun
d. A. Fouch~
President
March 28, 1980
Mr. Gary Plisga
Sohio Alaska Petroleum Ccmpany
3111 C. Street --
Anchorage, AK 99503
Our Boss Gyroscopic Survey
Job No. Boss-16561
Well Y-6
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: March 26, 1980
Dear Mr. Plisc3a~
Please find enclosed the "OrigiD~l" and sixteen (16) copies of
our Boss Gyroscopic Multishot Directional Survey on the above
well.
Thank you for giving us this opportunity to be of service.
Yours very truly,
~Y-SUN, INC.
Ken Broussard
District Manager
KB/kc
Enclosures
---.~CHIO-ALASKA-PEJROLEUE COPPANY
PRUDHOE BAY
....... ALA$ K A
SPERRY'BUN kELL SURVEYING COPPAkY PAGE
ANCPORAGE, ALASKA
.................. LATE OF SURVEY_M~RCB__26L1980
COMPUTATION DATE BOSS GYROSCOPIC SURVEY
APRIL 2, 19fl0 ,JOB NUMBER BOSS-1656!
KELLY BUSHING
.......................... TRUE ......... SUB-SEA.- .
MEASURED VERTICAL VERTICAL 1NCL
DEPTH DEPTH DEPTH DE
0 0,00 '81,26
100 100.00 18,74
............ -~00 20-~o00 ....... 118.7A
· 300 300-00 218,74
qO0 399.q9 318,73
5013 ~q99 °99 .... Z~l 8+7-.3
600 599,99 518,73
700 699,99 618,73
80-0 .... -7.99 .-99 ....... 2.18.73
900 899.98 818,72
- 1000 '999o98 918.72
1200 1199.98 1118,72
1300 1299,97 1218,71
~-1-4 ~-, ---15 99.97- ...... 1-31.8 · 7-1
1500 1A99.96 1~18.70
1660 1599.96 15~8,70
I~BO ....... 1 ~99 * 9& .......1
l~O0 1799,96 1718.70~
1900 1899,96 1818,70~
COURS£ __- CCURSE ..... DOG-LEG- ........... TOTAL _
INATION EIPECTIGN SEVERITY RECTANGULAR COORDINATES VERTICAL
G MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION
0 0 N O. O E 0.00 O.O0 O.OO O.OO
0 13 N 82, A E ,22 ,03 N ,19 E -.~2
O.-16 ...... S. 712L. 4A E .............. .12_ .O3..S ........ .5,_.E .............
0 22 S 83.20 E ,12 .lq S 1,13 E -,93
O 25 S 61. 8 E .16 .36 S 1.77 E -1.55
o~23 ........ $-33 ,-~ 3- E ,. 19 ....... ,81-_ S 2~, 2..7---5 - 2_,2.t__
0 23 h 82,10 E .Al 1.04 S 2,78 F -2.77
0 22 S 86.26 E .Off 1.02 S 3,¢4 E -3,23
13_ i5 ....._N_~9...5g-.E · 12.-- 1,04__S ......... 3_~9'L_E -i,6L
3 27 S P. 0.56 E ,21 1,10 S 4,58 [
0 19 S 2~,55 E .38 1,A2 $ 5,08 E -A.72
0 _ 22 ...... S__2~,52__E_ .......... · 05 ....... .1. · 9.6_S__ 5~33__5 -~,.2~
O 32 S A5.56 E .23 2.58 S 5,79 E -6.03
0 37 S 27,43 E ,20 3,:38 S 6,37 E -7.00
d 34 ...... S-..q5_.q~ E ...... ,19 ...... 4,20_S ......... ~6.._97 _g ..... -..ZJ_~_~__
0 22 .21
0 25 ,11
{3 4.5- .25_
9 22 ,14
0 . 24 .......S..~0.,_32.E_ _' . __, 11
O 28 N 89.q0 E .10
53.1~ E
38.32 E
_7-2.1~. -F
59. 8 E
65,3R E
PlO0 2099.95 2 O18,69 I'"lrl
2200 2199,95 2118- 69 t"='~ O0 19 N 71.22 E .19
2400 2399,9~ 231a,68
2500 2q99.93 2418.67~ ~O 22 N 46,52 E .60
27C0 2699.92 2618,66 ~ ~E 1~ N 76,28 E .55
28~0 2799,9~ 271~,66
3000 2999,88 2918,62 ~ 1 38 N 68,20 W 1,96
q,Tq S 7,58 E -8,81
5,22 S 8,06 E -9.48
fi.. 57_ _S- 8.,-q-9--5 - IA, O._q __
5,74 S 8,~8 E
5,98 S 9,34 E '10,95
.6.1.7_.~ ....... 9_.gfL_E ' 1.1_,55___
6,23 S 10,73 E -12.14
6.1A S 11.40 E -12.57
5,52 S 12,26 E '12.80
4,77 S 13,15 E -12,97
A ,14 ~ ........ 13-.9-7--E 'll.-1._L
3,66 S 14,80 E -15,44
4.25 S 15,22 E -lq,15
5,q7._S ...... !5.36 ~ - 1.5,_DL.
5,53 S 14,01 E -IA.Il
---~$¢H~0 AL ASK A-P ETR OL-E UN
PPUDHOE BAY
COMPANY-
SPERRY-SUN WELL SURVEYING COPPANY
ANCHORAGEe ALASKA
CONPU'rATION DATE
APRIL 2e 1980
PAGE 2
-CATE CF SURVEY MARCH--2G~--lgRO-
FOSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-16561
..... KELLY BUSHING--£LEV= ----R1~26 F..T= --
--T-R Ug $ U B- SE A
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
,,.
.'5100 3099.75 3018, q9
321:;0 3199,.'55 3118,09
350-G .... --3298.~59 ...... 321-7.53 -
3~00 3397-31 3316.05
3500 3q95,36 3~1q.10
~700 3688,~9 3607,23
3800 3783- Oq 3701,7R
~O00 3966,59 3885-33
~100 ~055.15 3973.89
~300 ~223.89 qlf12.63
~0 O q305.51 ~22~- 25
COURSE----- COURSE ...... DOG =-LEG
INCLINATIEN gIRECTICN SEVERITY RECTANGULAR
DEG MIN DEGREES DEG/IOO NORIH/SOUTH
3 57 k 69,26 W 2,32 3,78 S
6 5 k 59.qq W 2,29 ,Zq N
_. 7 -56 ..... N-61o lq-W ....... 1.86
10 15 N 60.qq W 2,32 13.88 N
12 20 k 5~.I~ W 2.13 23.91 N
.... 1 ~ --- 56 ...... N -55.~W 2-. 71 - -- 36,88- N
17 39 N 5~,32 W 2,70 53,07 N
20 20 N 52.56 W 2.7~ 72.A7 N
.... 25--25 ........ ~-.26~ 5~09- _- 95.2
26 12 k 51.26 W 2.81 121.1
29 ~ N 51. 2 W P.~q 150.3
35 12 ~ 51, 2 W 2,55
35 23 ~ 52, 8 W ,6~ 253,9
.....
COORDINATES VERTICAL
EAST/WEST SECTION
9,47 E '9,56
I ,68 E -1,~6
8-.-92--W ....... 1 £ '5---
22,71 W 26.16
39,52 W 45,36
82,16 W 96,56
XOR.2R W 128,95
O-g ...... 15l.,-79 .~U-- .....
9 N 170,73 W 207,96
2 N 206,88 W 25~+,31
6 N 289,90 W
8 N 335 o15 W q19.00
4600 qq65,27
qTOO qSq3,05 qq61
~900 q695.69 q61A
5000 ~770,g2 q689
-~O.O ....... q~,56 .... q76q
5200 q918.51 q837
5300 q990,17 q908
5~00 ..... 506~.~2
550~ 5131,8~ 5050
5600 5202,27 5121
...... 25700 ..... 52.7.2 ~$ ~- 5191
5800 53~2.67 5261
5900 5~12.62 5331
~100 5552,85 5~7~
2_.58_ __ 288
56,26 W 1,4q 323
56,26 W 1,07 358
N_.SG .-Lq __W ° ~. 2 .... Z 93
55.qq W .82 q30
5q,56 W .77 ~6~
~~.q_.W -92 - _ - ~06
5~,56 W 1.~2 5~5
5~,56 W 1,12 586
_~ · q D ........ 627
5q.~O W .1~ 668
5q. 8 W .~9 710
,16--- 752
· 20 793
· 26 b35
...... ,_~5 ....... 877
· ~0 918
.90 N 3 82..~SD___W___
· 28 N q33,q2 W 53R,39
· 18 N A85,68 W 600,57
· q5 N 592,80 W 72.13
· 25 N 6q6,77 W 793,92
,93 N 757,09 W
,37 N 813,91 W 997,17
,95 N 92~,~1 W 1137,51
· 5~ N 985,95 W
· 98 N 1101,3B W ~3~9,69
.78 N 1159.35 W
,R9 N 1275,22 W 1562,~6
----S r HZO,--A L AS K.a, RE-TRCLE
Y-6
PRUDHOE BAY
..... -~L-ASKA
SPERRY-SUN WELL SURVEYING
ANCHORAGE, ALASKA
COKPUTATION DATE
APRIL 2, 19a0
COivp/~Ky PAGE 3
DATE._OF S U R V EY _ MARC14__Z6 ,_ _1980 _ ~_
BOSS GYP. OSCOPIC SURVEY
dOB NUMBER BOSS-16561
....... KELLY- BUSH1 NG_ ELE¥-,.__m___B1,26_ FI.__
.................. TRUE ...... SUB-SEA
PEASURED VERTICAL VERTICAL INCL
DEPTH DEPTH DEPTH DE
6200 5622.68 5541.42
6300 5692,~6 5611.20 4
- &qO0 ..... 5762.3~ ..... 56~1. OA
6500 5832,23 5750.97
6600 5902.24 5820.98
-6-~0 0 ....... 547-2~5~+ ...... 589t~. 2-~ -
6800 6043, 17 5961,91
6900 6114.27 6033.01 4
7000 ..... 6186o02 -- 6104.76 - - -4
7100 6258.35 6177,09
7200 6331.29 6250.
' 730(I ...... 4~4 0~, $6 -- 6523.
7~+00 6477,10 6345,
7500 6549,z+1 6~68,
7700 6692.39 6611.
7800 6763.25 668,1.
8000 6905.31 6824.0~
8100 6977.26 6R96.0~.~ q
8200 ...... '~050.-.26 ...... 6969.0 4
8300 7124.04 7642.7~ 84
.400 7198.59 7117.3 z4l
~7195.
7269.7
INATICN
G ~ MIN
CCUR SE ...... D O.G~ LEG
DIRECTION SEVERITY
DEGREES DEG/IOO
5 45 k 54,44 W
5 45 k 55,14 W
5 --~9 ..... k.-55.2G- W.
5 37 N 55. 2 W
5 30 N 55,26 W
5 --t-0 .... ~ - 54-, 50- W
~ 58 N 54,56 W
~ 24 N 5~. 2 W
3--- 54 ~-- N 53,44---W
3 ~7 K 53.1~ W
TOTAL ................
RECTANGULAR COORDINATES VERTICAL
NORTH/SOUTH EAST/WEST SECTION
2
42
42
8600 7350.98 .
8700 7427.46 7346.2 4
........ -75. ...... 7 422
8900 7579,21 7~97.9~------J
o000 7654 02 7572 7~ ""'"-4
· · r'"'-
9 ! O-O -----Z-~ 2-a .-l- 0 ..... -7-&-~
9200 7802.11 7720.850
4 -- 4 -~ ...... N.- q :Ao58 -l,l ......
4 30 N 47,20 W
3 28 N 46.50 W
2 .... 45'_ ..... JL_~5 .L9 W _ _
2 10 N 44.32 W
· 12 961].58 N
· 50 1001,88 N
· _11 .... 1042.76 N
· 13 1083.65 N
· 21 1124.46 N
........ -64 ..... 1-1 &5.~.37-- N
· 20 1206,45 N
.68 1247,49 N
...... ,64 -1288.69- N
· 50 1329,97 N
· 73 1371.31 N
..... .42 - -1412.98 N
.59 1455.37 N
· 61 1498.62 N
._. ,81- ._15~2, 92 -N
· 71 1588,39 N
1.21 1635.28 N
.23 ...... 1~82~99 N
.28 1730,64 N
1.1n 1778.12 N
1.15 __1825,72 N
· ~3 1873.65 N
1333,41 W 1633,59
1391,93 W 1704~_1
-1 ~ 5 O .~8___W_ ......1775 __=_
1509.32 g 1846,65
1567.90 W 1917.49
1626 ·
1683.73 W 2058.42
1740.83 W 2128.31
1852,34 W 2266.37
1906.84 k 233~,53
....... 19 & O ._92.-_-linE. = =-2.A {3 ~ 6 O ~
2014,88 a 2471-07
2068.73 W 2540.02
-.2122,51)--W ..... 2609,61--
2175,95 W 2679.77
2228,67 W 2750-31
2332.2q W
2382,90 W 2960,51
2479.46 W 3096.20
25 k 42,55 W 1,qO 1922,03 N 2525,28
__6 ..... /~_. ~.,_2_W ....... 3.. 81 ......19E7,96_N ..... ~1_,/~I1.
3,57 2008,57 N 2621,37
· 76 2C46,39 N 2673.5~
· 92 .... 208_~. 62 N .... ~7~,9.~__W
2,00 2125,12 N- 2777,25
1.52 2168.35 N 2827.59
9 N ~6,58 W .75 2259.~9 N 292~,56
~ 55 N 53,56 W
0 19 N 54,56 W
1 7 N 50.26 W
2 k ~8.44 W
3162.62
3 22Y_,_7_8__
3291,94
3356,01
3428,52--
3485.76
3552.09
3686.49
...... $ OH-I-O-AL-ASK ~-P E-T ROLE L M COMPANY
PRUDHOE BAY
~ ALA SJ(4~
SPERRY-SUN kELL oURVEYING COPP~r~Y PAGE
ANCFORAGE~ ALASKA
.............................. I~ATE_OF SURVEY MARCH_-2_6,--19RO
CONPUTATIOh DATE EOSS GYROSCOPIC SURVEY
APRIL 2, 1980 ,JOB NUMBER ROSS-16561
.- KELLY~ BUSH~J~G ~I.-E-~-:----R~o2G--F-I-~---
· - ........ T R LLE, ........... ~UB-SEA ....... COURSE__.
MEASURED VERTICAL VERTICAL INCLINATICN
DFPTH DEPTH DEPTH DEG MIN
COURSE .... DOG-LEG ....... -TOTAL_
~IRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL
DEGREES DEG/IO0 NOR TIt/SOUTH EAST/WEST SECTION
9500 7876.33 77Y5.07 A2 1 h A5.32 W
gAO0 7950.39 7869.13 /+2 25 h qq,49 W
~0 ..... 8~23.82 ....... 7qq2.56 ---q3 .... 5 ...... N _aS. lq. W
°600 8096.37 801~.11 q3 5~ N q~.q~ W
~700 8168.57 8087.31 q3 39 ~ q2.~ W
........... 9-8-~ .......-8-2-4.-1-.-5;~>---~ 8-[-60.2 7 ........q~---~9---~qO~~
9~00 R315,Gq 823q,38 Al ql N 37,~9 W
10000 8389.61 8308,35 q2 56 N ql,25 W
°72 2305.97 N 297q.65 W 3753.~6
.69 2353.56 N 3022.08 W 3820.56
._80- .....2qOl. 71 N ...... 50[~q-.92--W
· 95 2q50.55 N 3118.ql W 3957.u5
1,37 2500.76 N 3165,99 W q026,D1
~5- ~552.06 N- --~1~9--~--~~~~-
2.09 260~,30 N 325~,~2 W qlGO,19
2,82 2656,30 N ~2~6,02 W ~226,73
10200 8532.78
10300 8603.5P
10500 87q5,71
1 0600 8817.59
1-07-0 0 .... 88 9-0-.-7-7---- 88 09.51
I 0800 8965.2q 8883.98
10900 9OqO.q9 8959.23
-----2,~7~-.- -2, 707
· ~5 2757
1.~7
l .l~ .--2A62
.97 2916
2,97 2971
2 15 .... N-3q ..l 9.-W ........... 1~3-- 5g27
i 2fl N 3q. 2 W .79 3082
0 55 k ~3.25 U .75 3137
a 29
a365.92
A~q36.27
q, 575 o77
aGqq.03
.~. 7-3.-.0 ..5 _~ .
~775.10
4~838o91
11100 9192,70 9111.q/+
11200 9269.86 9188
LI-~ O-O ...... -.uS q 7.88~ .... -9.26 G
11q00 9z~26.65 93~5
11500 9506.12 9q2q
I 1643 9620.66 9539
.12 N 3755.9q W
· Gq N 3788,70 W 502q./~
.88 N 3851.25 W 51~3.01
· 53 N 3881,~6 W 5200,69
~q-_N .... 3896~25 W, - 5229.16
· 0~ N 3923.62 W 5281.89
HOR I-Z-0-N-T4 L-J21 SP-L-A C E-F-E N
THE CALCULATION PROCECURES A B~::~,EE' Ol',i THE
.-A.T--N OI~:I'H .~-q.7--- DE G. .... [ 8- - l. tl N .~--W ES-T- 4k-I.--MD- -=--L.1.-6 q~
USE OF THREE DIMENSIONAL RADIUS OF CURVATURE
METHOD,
SPERRY-~UN WELL SURVEYING COFPANY
ANCHORAGE, ALASKA
.... SO-HI-O--ALASKA .P-E-TRGLEUE CO~tPANY
Y-6 CO~,PUTAT ION DATE
P~UDHOE BAY APRIL 2~
.... AL~ ~A
PAGE 5
LATE OF SURVEY MAILCH_26~,_].980.
,JOB NUMBER BOSS-16561
KELLY_ BLLSH:[NG_F_LEV-_- = 81_-26 FT_-
....... -INTLRP-OL-A-TE-D--V/tLLEg FOR-E.-~/£N--IO00 _FEET.. OF__~EASIJEED _DEPTH
TRUE
--P,E-A~~, U R E D, ~ E-R-T -! C A L ....
DEPTH DEPTI-
1000 999,98
2000 1999.95
SUB-SEA TOTAL
V E-R T -I CA L ---- R F C.T-A N-G-LLJLR--COCR DZN-A Z~S ...... P.E_-_T VD .......... VE Rl'_[C AL
DEPTH NCPTH/SOUTH EAST/k~EST EIFFEPENCL CORRECTION
-~1,26- ......... O-oDD
918.72 1,/+2 S
1918,69 6.17 S
.0,.00 ....... O,OO ...........
5, 08 E · 02 ,02
9,9lq E ,05 ,03
3000 ....... 299-9.8R------ 2918..-6-2 ........ 5
4000 3966.59 3885.33 121
5000 ~770.92 q689,66 q68
G§O0 .... 5x~ P--..-7-2 .... 5~1-,~6 ...... 877
7000 6186.02 610~.76 12RR
8000 6905.31 682~.05 1730
~0000 R389.61 830~.35 2656
11000 9116.31 ' ~ 9035.05 3192
~16~ .... 962~+6~ .... A539.40--~ 3536
· . 5-.:3- S .......... 1 ~,.01 --E ........ ol-2- ............
o19 h 170,7~ ~ ~o~+I 35,29
· 25 N 64}6.77 W 229.0R 195.68
.35-N ...... 1217,30 la- ....... 517.,28 ....... 288-2.0-
· 69 N 1796, 98 W 813.98 296.70
,6~+ ~ 2332,2~ ~/ 109'~,69 280.71
o :35-- N ...... 282-7-.-5 9- id .......... 1-,345 °-98 ......... 253.° ~_ 9
.30 N 3296,02 td 1610,39 26~.~1
· ~1 k 37Pl, 73 W 1883,/:,9 273,30
, O-q--- -.~ ...... -Z~5 2 ~. 62 W .......... 2D 22~.q .......... 138,-~ ~. ----
THE CALCULATIO~ PRC£EDURES AR~>DASED 0
O0
--hZ
,mmmmmm
.
N THE USE OF THREE DIMENSIONAL RADIUS OF
CURVATURE METHOD,
gCHIO ALASKA-PEIROLELM COMPANY
Y-G
PRUDHOE BAY
.... ~bA-~4A ......
SPERRY-SUN 6ELL SURVEYING COMPAD'¥
ANCHORAGEe ALASKA
COD~PUTATION DATE
APRIL 2~ 1980
PAGE G.
-DATE OF SURVEY MARCH 26,~ 19.80
dOB NUMBER BOSS-16561
KILLY- BUSHt-NG -gL-F:-V-,---- --84-~-F-T-,---
............... JKT-ERPOLATED VALUE$-FCR-E-VEN 1~t~ FEET OF-£UP.--.SEA- DEPTH
TRUE SUB-SEA TOTAL
--Y E-ASURE-D ...... -VER-T t C AL----- VERT I C-AL- ---RE CTAN GULAR- ----F~ ORD INA T ES---
DEPTH DEPTH DEPTH NORTH/SCUTH EAST/WEST
F~D-"--TV-D - -- -
DIFFERENCE
0 0-. 00 ......... At o2 6
81 81,26 O. O0 .02
181 181,26 100.00 .00
381 381.26 300,00 .29 S
~81 ~81,26 ~DOeO0 .71 S
5~--~5~-1-., 26 .......... 50C.00
681 681.26 600.00 1-01 S
781 781,26 7DO,SO 1.0~ S
~ 861..26 ..... 80-0. O0
981 981,26 .__. 960,00 1-32 S
1081 1081,26 1000.00 1,P5 S
1181 ........11R1,2G ..... 1ADD. DO
[1. QO ......... Oo 0 0
· 12 E
· 51 E
l.~ 0-1- E-
1.65 E
2,2~ E .01
2,-66--~-£ ................. · 01
3,32 E .01
3,89 E · O1
5, 0~' E , 02
5.28 E ,02
5 ,.GY_._E
6.28 E
6.84 E
7.98 E . DA
8. ~2 E .04
~o-8 L- E ~o O-q
1281 1281.26 1260
1381 1381,26 1300
1 ~ 81- ~--4-q81~2 6 ..... 14 O 0
1581 1581.2G 1 500
1681 1681,26 1620
1-781~ -- --1181 · 2&---- ~l 7-00
D0 ~ 3.20
.
· 00 ~ '~.07
.00 t,'rl ~ 5.11
.00 ~3'-'5,55
~5.71-_s
_ V E RT-I-C-Ak,
CORRECTION
.00
.00
- --
.00
,00
..........
.OD
.00
...... o00
.00
.00
.00
.01
o0-0
.00
o00
SPERRY-SUN WELL SURVEY)NG
ANCHORAGE~ ALASKA
----$6 H tO--A L A S K A-P- E-TR OLELF-C OF, P A N Y
Y-6 CONPUTATION DATE
PRUDHOE BAY APRIL 2~ 1980
~L~-SK A
COPP AI~Y
PAGE 7
.DA TE_OF _SURVEY. H_AR£H__2G.,__~ AG
dOB NUMBER BOSS-16561
--KELLY BUSHING.-ELE-V-~- 8_1_-2G FT-
--t-k T E' R P OL-A T-ED--V ,~-L UES -F-OR--E-V E N--t-0%--FE-E-T- -0 F-- -SU [~--S E-A-DE P TH
TRUE SUB-SE
----t'zE'-A-,C, -%q%E-D-- -----VE-R-T--I-G-A-L---- V E tzT I C A
DEPTH DEPTH DEPTH
1-881 .......]-gg~-, 26-- 1 800..4)0
1981 1981.26 1900,00
2081 2081.26 2DOC.O0
2 ~8-t-------2-t-8-t-,.;~ ~------2
2281 2281.26 221~0.00
2381 ?.381.26 2:300.00
2 A-P,-1 ......... 2 ~+8-1--2 6 ..... 2 4 O.O
2581 2581.26 2500,00
2681 2681.26 2600.00
.2~1-----q2-781-- 2-6 ....... 2700.. bO
2881 2881.26 2800.00
2981 2981.26 2900.00
TCTAL
--R-ECT AN-GU L AR ....COOP, ID- I-NAT F~--l" I:L-J V D
NORTH/SOUTH EAST/WEST DIFFERENCE
V£ RTI CAL
CORRECTION
5.9-~%-- $ 9.25 g .0-4 .............
6.15 S 9,,85 E -0~+ .00
6,23 S 10.58 E .05 .00
&.-:t-7---S 1--1-~-~ 0--E ---- =-0-5 --
6,,05 S ll.6q E .05 .00
5.71 S 12.01 E .0G .00
-q, P,&--S ........ .1-3~ -07 --E-- .......... .0--7 ................ ,,01---
A.29 S 13.75 E .07 .00
3.68 S 14.70 E .08 .01
5,2& S 15.37 E .69 .01
5.72 S lq.51 E .11 .02
:3~l.8,-1 - ---.50 P>-I-. 2 6------~ O00-.-0..0. ............. 4 ~-2a.. -S-
3181 3181.26 3100.00 .P4 $
3282 3281.26 :3200.00 ~ 5.00 N
338-,3- .....$~8i-~26- 35 OO-.-O-O ..... ~ Z2,q5--N.
:.3485 3~+81.26 3400.00 22.28 N
3588 35R1.26 3500.00 ~ K-55.21 N
-hZ
lO.-&6- E ......... ,,21 .....
3.3q E · 55
6.81 W 1.25
.... 2Q.l_B__W ............... 2.~-~5 ....
56.7P W 7.09
P_O ._32. _ W ........._1.1,16 ......
__ ..1. O
.70
! o18
1.88
2.78
. .~_. 07
--.--~CH]-O--~LJ~S K A- P EIR OL ELY
Y-6
PPUDHOE BAY
...... A L-ASF~A ...............
COMPAN-¥
SPERRY-SUN WELL SURVEYING COMPANY PAGE 8
~NCHORAGE9 ALASKA "
...................... .DA.TE OF .SURVEY MARCH 26~, 1.980--
COPPUTATION DATE
APRIL 29 1980 UOB NUMBER BOSS-1GSG!
-KE LI,.-~--BUSHI-NG--E I.E-V+-:--~-,t o 2,-G-£ T =
t-N.I-ER-P--0 L A-T.F.~-N AL L E.~- F 0 E_ E V E N - i-00 _F E F._T __,OF----S U E -_S.E~ -O 5-P-T H
TRUE SUB-SE
..... PJE-ASURE D ....... VE4~- I.~ A-L---VE R T-I C A
DEPTH DEPTH DEPTH
A TOTAL
L ....R ECT ~-N G ULA R--- CO ORD INA-T ES ..... ND
NCRTH/SOUTH EAST/WEST DIFFERENCE
V£ P,J I-C AL--
CORRECTION
3905 3881
q016 .'3981
q2~+8 ~181
4370 ~281
....... a..~ 9.3_- .... q~l
q62 0 '4481
5013 A781
52a7 ....
5~28 5081
5570 5181
5712 ........ _.52 a 1
5855 5381
5997 5~81
._AL~_O .... ~55.81
·
.26 ..... 3700°-00
· 26 3800.00
.26 3900.00
.2~ .......~000.00
,26
· 26 ~200.00
,2~ q3QO.O0
.26 ~00.00
· 26 q500.O0
· 26 qTO0.O0
· 26 qSO0,O0
· 2&_ .... ~gOO~OO
.26 5000.00
· 26 5100.00
.26-- 5200.-00
°26 5~00.00
· 26 5qO0.O0
· 26 ....... 5500.~0
.... 72.~8 k ...... 107.7£ W 16.8A ......... 5.Ga----
96.67 N 139.67 W 2~,67 7.R~
125.76 N 176,43 W ZS,I) 10,q6
.... 15-9.71 -N -----~8~q5- W ........... ~81 ...... 13.G8
199,33 h 266.80 W ~6.75 17,9A
2~3,q0 N 321,56 W 88.99 22.2~
.... 2gG.19 ~ N ~19, 7~..~ ....... 112~8 .25.59
330,32 N ~q3.96 W 1~9,1~' 26,57
375.71 A' 511.91 W 168,29 29.1~
..... ~.2~ 3q N ........ ~a~ A~
q73.55 N 65~,21 W 232,5~ 32.92
525,A5 N 728,25 W 267.37 3~,82
639.36 N 887.~7 W 347.26 41,07
698.01 N 968,65 W 3P8.76 ~1,52
~ ~ 817-03 h 1133.25
0 876.49 h 1216-10
~Z~73
__.--SOH-IO --AL ASK~A_P-F..3 R OL£ tM- COMP AN ¥-
Y-6
PR LIDHOE BAY
-----A L A SX-A--
SPERRY-SUN WELL SURVEYING COFPANY
ANCHORAGE, ALASKA
COFPUTATIO& DATE
APRIL 2,~ lgRo
PAGE
gATE OF .SURVEY_MARCH- 2G,__1980
,JOB NUMBER BOSS-16561
_._KELL¥._BUSHING- E.I~_,-_=~ RI_,2G_ FT.
............ _I.NT~RPOLAT.EC-VALLES FOR-F_.VEN IOCL_FEET_QE--SU~-S-EA DEPTH .......
TRUE SUB-SE
~-M E~-~ UR g D-----VER-T-I C A L~V-E ~ [-CA
DEPTH DEPTH DEPTH
A TOTAL '
L ....gE CT_AN GCLAR
NCRTH/SOUTH EAST/WEST DIFFERENCE
........ 6293 ..... 5681 °26
~427 57~1,26 5700,00
6570 5881,26 5800,00
6.7-1-2- ........ ,598&-.-2
6853 6081,26 6000,00
6~93 6181,26 6100,00
7268 6381.26 6300.00
...... 995 ,.3i
1053.~3 N 1466, 61 W
1112.29 N 1550,36 W
...... 117 O .-_q-G--N ....
1228-~9 N 1714,62 W
1285.97 N 1793,30 W
1399.68 h 19~3-7~ W
WE R T_I C AL
CORRECTION
602.69 .......... q5.30
6q5.86 43.17
688.81~ A2.9~
_ _731 .il_. ._q~&O
772.51 41,q 0
812.13 39,62~
_850.5~ ........... 38 .~
887.03 36,73
6~81,26
7A05
--7-5~A-- .&S&l-,.2 & .......... G 5-50o-~ O-- ...... i 51
7684 6681.26 6600,00 158
7825 6781,26 6700,00 164
171
6q, O0.O0 1457.83 N 2017.97 W 92q.q, 7 $7.~5
7.97_N .... __2Q!i2..GQ_W- - __ 962_,_5iS .......... _58,52
qO,O7
796-6- .... 68A3.,2X~---- 680-0.. £0 -
8105 6981.26 6900.09(.~
R2q2 7081.26 7000.00~
~76 .... -7-1-81+26 ...... 71~0~ - -
8509 7281,26 7200,00~- ' ~
8639 7381,26 7300.00~ ~
..... 8-77 O ..... 1~8~ - 2~-- lA O C · O 0 ~
2385, 65 W
2~+52,2q W
__253.. q · 9..q-. W .....
2575, 95 W
1,18 N 2167,59 W 1003,07
7,43 N 2241, 95 W 1C4~,20
4 .S& .{~ ....___2_31_~. 9_O__W ...... ~~..03
I 12~. 25
1160,9~
1227,75
1258,21
1289 ,~ 8
1780.73 N
18~+ 5,91 N
191 O
1971,80 N
202,3-62 N 26~1, 75
2.~ 7 ~,._1...9_. N-----...2- 71
q1,13
39,23
36,69
32,15
30.~6
~-SOHI-O-AL-ASK-A- PE-TEOLEU~- CCMPANY .....
Y-6
PRUDHOE BAY
SPERRY-SUN I. ELL SURVEYING
AN£HGRAGE~ ALASKA
COMPUIATIOk DATE
APRIL 2,~ 1980
COFPANY PAGE 10
.DATE* OF SURVEY-MARCH-2Ge--*lgP, O
dOB NUMBER B0SS-16561
KE L-L Y--BUSH~I N~--F.-L-E-V - a~l+~l-6--F. T =
-Z ~T E R P. OLA_.IiE.D__VJU. JJ ES _F 0 E-[ VE~_~_EEE. I. _ Q F__S U R_-_$F_~ E P T H
·
TRUE SUB-SEA TOTAL
M.E~£D__- -~F~[IC AL___ VF~ ZI C. AL_.__}!E CTAN G ULA R___ C~O [LED IN A_T ES.-- .....
DEPTH DEPTP DEPTH NCRTH/SOUTH EAST/WEST DIFFEPENCE
8_902 ...... 75 81o2_6__.__ 75 DD,-O0
9056 7681,26 7600,00
9171 7781,26 7700,00
9,3 O 6--~788~1.26
96~1 7981,26 7900,00
9579 8081.26
9-717 .... 8,1~. 2 ~ ...... R ~0 ~~ ......
9R53 8281,26 8200, O0
~988 8381.26 8300.00
10268 8581,2G 8500,00
10~09 86~1,26 8600,00
~0687 888[.26 8800.00
¥£R_.TZCAL
CORRECT ION
2126,2& _h~ ...... 2_77 8,_62__W ....
2184,64 N 2fl~5,96 W
2246,27 N 2912,90 W
- 2~-09 oOg---N ........
2573,68 N 3041,~G W
2A40.17 N 3108,23 W
25 09 ,~ ~-N--~ i~-A ~1-7- W .........
2580,01 N 323~,57 W
1 497, 77 37
/
1536 o2 7
1572,65 36,$8
2650.45
.... -272
2792.6~+
2867,20
.... 29A.I
3020.~-
34,71
~1,20
~+0,99
37,5~
10821 8981,26 8900,00~ 309q,57 h 3657,75 W 1840,11
! 0952.%---,- _90 81+2 6------.,-90,~0 .-?-?:~ ..... J 1 g7 ~-~ .... ~-~& -~ -- -~87
11085 9181.26 9100,00~ 3238,96 N 3750.95 W 1903,83
1121~ 9281,26 9200,00~~ 3309,62 N 3793,~0 W 19~3,~3
~3~2 ........... 95~.2~ - -9.300 ~D.O00 5378.4~_N ...... 383~,56 .W_ . 1
34,22
5,?.-o5 3 -
31,18
29.60
$OHIO-/~L/~SKA PF.._TROLEUM COMPANY
PRUDHOE BAY
..... ~-L-A $-K A-
SPERRY-SUN ~,ELE SURVEYING COMPAkY
ANCHORAGE, ALASKA
COMPUTATION DATE
~PRIL 2,~ 1980
DATE OF SURVEY
PAGE
MARCH_26,_ 1980__~
JOB NUMBER BOSS-16561
KELLY BUSHING.-ELE-V-~ ~.= ~ 81~.2~__FT,___
INTERPOLATED
TRUE SUB-SEA
..... ME-A-SURED ..... VERT-ICAL ~ -VERTLCAL
DEPTH DEPTH DEPTH
¥ALUES FOR E.VEN lDO FEET OF_SUB-_SEA-DEPTH--
TOTAL
RECTANGULAR--- COOR.D :I~L~k.~ £S ...... M.D.-.T V D ........ .VERT[CAL_
NCRTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
1 1468 ........ 9481.2& ....... 9400oQ-0_
11593 9581.26 9500.00
11643 9620.66 95.'59.40
THE CALCULATION PRCCEDURES USE A
THE NEAREST 20 FOOT MD (FROF ~ADIUS
_ ~445,.22 N ........ 5872_.21_W .... 19&7.6 O .... 26_.32
3510,46 N 3909,15 W 2612,58 2~,98
3536.04 k 3923.62 W 2022.3~ 9.75
LINEAR
INTERFOLATION EETWEEI~
OF CUR¥ATURE} FOINTS
SOHIO ALASKA PETROLEUM COMPANY
April 2, 1980
Alaska Oil & Gas Conservation Cc~m%ission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hsmilton
~Fi RE3 ENG
3111 "C" STR
ANCHORAGE, ~~
TELEPHONE {O07}'~~r 1
ANCHORAGE, ALA~9,0g FO
__I. 2 ~,~~
J ST~,TTEC
1
CONFER:
FILF:
..
Gentl~uen:
Well Y-6 (23-28-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-namedwell
for the monthofMarch, 1980.
AMR:ja
Enclosures
cc: Well File #17
Yours very truly,
Austin Reid
Acting District Drilling Engineer
Form N~ !~0-404 ( SUBMIT IN DUPLICATE
"I~,EV 3-1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. AP! NUMERICAL CODE
50-029-20431
6. LEASE DESIGNATION AND SERIAL NO
ADL 28287
OiL [] GAS []
2. NAME OF OPERATOR 8, UNIT FARM OR LEASE NAME
Sohio Alaska Petroleum Ccmpany Prudhoe Bay Unit
3 ADDRESS OF OPERATOR 9. WELL NO.
Pouch 6-612, Anchoraqe, Alaska 99502 Y-6 (23-28-11-13)
4. LOCATION OF WELL
At surface:
1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
11. SEC. T. R M (BOTTOM HOLE
OBJECTIVE)
Sec. 28, TllN, R13E, UPM
12. PERMIT NO.
80-02
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
March, 1980
Directionally drilled 8 1/2" hole to 11643'. Ran openhole logs. Ran 42 jts. 7" 29#
L-80 Buttress casing to 11637'. C~ntedwith 460 cu.ft. Class G c~aent. Cleaned out
to 11593', tested casing to 3000 psi. Changed well over to NaC1, ran CBL. Ran 316
jts. 4 1/2" 12.75# L-80 CS Hydril tubing to 10019'. Landed tub'..ln~withball valve
at 2027'. Installed and tested tree. Displaced tub~ to diese . Set packer at
9912', tested tubing to 3500 psi. Released rig at 1330 hours, 3/12/80.
EFW:ja
14. I hereby certify that the forego, nm,.s true and correct ActJ_ng
n~
SIGNED
NOTE--Report on th~s {orm ~s reqmred for each calendar month, re§ardless of the status of operations, and must be filed in duphcate with the
oil and gas conservation committee I~y the 15th of the succeeding month,unless otherwise directed.
SOHIO ALASKA PETROLEUM COMPANY
March 7, 1980
__/
~-~ ,~,~--
TELEPHONE (907)~_~0-~- -M
ANCHORAGE, ALASkA_99~'''r' _~
~ CONFER
; FI LF:
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
Attn: Mr. H. Hamilton
Re: Well Y-6 (23-28-11-13)
Gentlemen:
Enclosed please find, in duplicate, Form 10-404, Monthly Report
of Drilling and Workover Operations, for the above-referenced
well.
Very truly yours,
SOHIO ALASKA PETROLSIE~ COMPANY
~. M. Reid
Acting District Drilling Engineer
Enclosure
CC:
S. Bundy
A. E. Leske
Drilling File
Form No 10-404
REV 3'-1-70
('
SUBMIT IN DUPLICATE
STAT E 0 F A LAS KA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50.-02.9.-20.431
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28287
OiL [] GAS []
2. NAME OF OPERATOR
Sohio Alaska Petroleum Ccm~any
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchoraqe, AK 99502
4. LOCATION OF WELL
At surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM
8. UNIT FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
y-6 (23-28-11.~13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11 SEC T. R M. (BOTTOM HOLE OBSECT[VE)
Sec. 28, TllN, R13E, UPM
12 PERMIT NO
80-2
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
February, 1980
S~_d well at 0515 hours, February 2, 1980. Drilled 17 1/2" hole to 2715'. Ran 69 jts.
13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 3854 cu. ft Permafrost cexflent.
Installed and tested BOPE. Cleaned out to 2647 ft; tested casing to 3000 psi. Drilled
out shoe, ran leak-off test. Directionally drilled 12 1/4" hole to 10474'. Ran open
hole logs. Ran 268 jts. 9 5/8" 47# L-80 Bu%tress casing to 10467'. Cemented in two
stages: First stage with 1518 cu. ft. Class G cement; second stage through D.V. Packer
at 2596' with 130 cu. ft. Permafrost cement preceded by Arctic Pack. Cleaned out to 10467',
tested casing to 3000 psi. Drilled out to 10497', performed formation cc~petency test.
Directionally drilled 8 1/2" hole to 10667'.
14. I hereby certify that the forel~,,ng g truce, and correct ~Act~i/3g Di_strict
SIGNED ~_~. jVC. ~ ~ TITLE urillLng ~ngineer DATE ~/~.~/~O
NOTE-Report on this form ,s required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation corem,tree by the 15th of the succeeding month.unless otherwmse directed.
Alaska 0il and Gas Conservation C_~wm~ssion
Ho¥1e H. Hamil~~o
ChaLrman of the
n
Lonn~e C. Smith
~ss[oner
~byD. Fo st~~
Pe~ole~
February 7, 1980
Witness DOPE test on SOHIO e s
Y-6 Sec. 34, TllN, l~3E, UM
Permit #80-2
.Tu..esday.~. Feb .rUa..ry 5, 1980
I traveled to PrudhOe Bay this date after Mr. Dick Maskell, SOHIO drilling
foreman contacted me concerning the upcoming DOPE test on
The BOPE test ~ at 6t30 ~ ~d ws ~o~uded at 11~30 ~. The re~lts of
~e test are attach~ to ~is re,rt.
In ~~ I wi~essed ~e ~PE test on,'~HIO~s
~ ~e cho~ ~ifol~ ~d ~e up~r Mly valve had ~en re~r~
test~ ~ SO00 ps~g.
o ,
· /
~_
January 3, X980
Re: Prudhoe Bay Unit Y-6 (23-28-11-13)
Sohio Petroleum Company
Permit No, 80-2
Stir. Loc. I 1318t SNL & $055t WEL, Sec. 34, TllN, R13E, UPM.
Bottosdlole Loc.: 1850' NSL & 1880' E~.., Sec. 28, TIlN,
It13B, UPH.
Hr. P. R. Judd
District Drill/no Engineer
Sohio Pet~ole~u Company
~ou~ 6- 612
A~Orage, Ala~a 99502
Dear Hr. Judd:
gnclosed is the approved application foe permit to drill the
above re£erenced yell.
Well sam. pies, core chips and a mud lo9 are not required. A
directional survey is required. If available, a tape contain-
ing the digitts, ed log information on all logs shall be submitted
£or copying except experimental logs, velocity surveys and
dip~eter surveys,
Many rivers in_Alaska and their .drainage systems have been
classified aa important for the spawning or migration of
anad~omous fish. Operations in these areas are sub,jeer to AS
16.50.870 Lnd the regulations pr~lgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations
yOU may be contacted by the Habitat Coordinator's office,
Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
Hr. Po R. Judd -2
P,B.U, ¥-6
~ranuary 3, 1980
oommencing operations you may be con~acted by a representative
of the Department of Environmental Conservation,
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska
Department o£ Labor is being notified of the issuance of this
permit to drill.
To aid us in schedulinq field work, we would appreciate your
notifying th~s office within 48 hours after the well ko spudded.
We would also like to be notlf~ed so that a representative of
the c~u~tssion may be present to w~tness testing' of blowout
preventer equipment before surface casing shoe Ls drilled.
Xn the event of suspension or abandonment, please give this
office adequate advance notification so that we nay have a
Withes s present.
Very truly yOUrS,
Hoyle H. Ham~Iton
Ch&.irman of BY ORDE. R OF THE
Alaska Otl & Gas Conservation Coma/ss/on
/
Enclosure
cc~ Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o/encl.
Department of Labor~ Supervisor, Labor Law Compliance
Division w/o encl.
SOHIO PETROLEUM COMPANY
Division of Sohi~ Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
Alaska Oil and Gas Conservation Cc~ssion
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention:
Gentlemen:
Mr. Hoyle H. Hamilton
Well Y-6 (23-28-11-13)
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
a, NCHORAGE, ALASKA 99502
Enclosed are the follc~ing documents:
1. Application for Permit to Drill, in triplicate
2. Proposed Drilling Program Outline
3. Our check for $100.00 to cover the permit
filing fee.
4. Three copies of surveyor's plat showing well
location.
Very truly yours,
SOHIO PETRO~ COMPANY
P. R. Judd
District Drilling Engineer
PRJ: ja
Enclosures
cc: Well File #17
Form 10-401 SUBMIT IN TRI TE
REV, 1-1-71 (Other lnst~uctlB on
la. TYPE OF WORK
STATE OF ALASKA
reverse s~de)
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR DEEPEN
DRILL I~ DEEPEN I-']
b. TYPE OF WELL
OIL ~ GAS SINGLE MULTIPLE F-='i
WELL WELL O OTHER ZONE [~ ZONE | !
2. NAME OF OPERATOR
Sohio ?otroleum O:mpany, Div. of Sohio Natural l~soureos Co.
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL At surface
1318' SNL, 5055' ~EL, Sec. 34, TllN, R13E, UPM
At proposed prod zone
1850' NSL, 1880' EWL, Sec. 28, TllN, R13E, UPM
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
10 miles NW of Deadhorse
API #50-029-20431
LEASE DESIGNATION AND SERIAL NO
ADL 28287
7 IF INDIAN, ALLOTFEE OR TRIBE NAME
8 UNIT FARM OR LEASE NAME
Prudhc~ Bay Unit
9 WELL NO
Y-6 (23-28-11-13)
10 FIELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Pool
11 SEC., T, R., M, (BOTTOM
HOLE OBJECTIVE)
Sec. 28, TllN, R13E, UPM
12
14. BOND INFORMATION
~E Blanket Surety and/or No American Insur~
15. DISTANCE FROM PROPOSED *
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT.
(Also to nearest drlg, umt, ff any)
1880' east of
ADL 28288
DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT
2664' west of Well Y-4
21 ELEVATIONS (Show whether DF, RT, CR, etc.)
est. KBE = 81' AMSL
Ace Co. 3348616
16 No OF ACRES IN LEASE
2560
19 PROPOSED DEPTH
11679'MD 9647'TVD
17. NO.ACRES ASSIGNED
TO THIS WELL
160
20 ROTARY OR CABLE TOOLS
22 APPROX DATE WORK WILL START
January 10, 1980
23 PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE SIZE OF CASING WEIGHT PER F~T GRADE ]V~ SETTING DEPTH~T~~ Quantity of cement
36" 20"x30" Insulated Cor~uctor 110' 110' 8.0 cu.vd.
17~" 13 3/8" 72# L-80 2700' 2700' 5000 ml.f~_ P~f~n~ TT
12~" 9 5/8" 47# L-80 10469' 8754' 1736 cu.ft. Class G;130 cu. ft.
8~" 7" 29# L-80 11679' 9647' 320 cu.ft. Class G
PFC
See attached proposed drilling program outline.
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal 15 to deepen g~ve data on present productive zone and proposed
new productive zone. If proposal ~s to drdl or deepen chrect~onally, g~ve pertinent data on subsurface locations and measured and true
vertwal depths. G~ve blowout preventer program.
24. I hereby cemfy that th~ Foregoing is Tree and Correct
District
TITLE Drillinq Enqineer
(Tins space for State office use)
SAMPLES AND CORE CHIPS REQUIRED
[]yEs ~o
DIRECTIONAL SURVEY REQUIRED
[] NO
CONDITIONS OF APPROVAL, IF ANY
MUD LOG
[] YES ~O
OTHER REQUIREMENTS
A.P.I. NUMERICAL CODE
APPROVAL DATE
PERMIT NO. - "7-'t "~//~ ~ O -"%--
DATE '-01/03/80
APPOVED BY _ . . TITLE Chairman
BY OR~,ER Or~bl
~ ~ ~ ~ See Instruction On Reverse Side
= CO~%~tSS~ON
PROPOSED DRTT.I.ING & C(1MPLETION PRE~4~M
Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated
conductor to surface using concrete.
Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to
surface using 5000 cu. ft. Penmafrost II cement.
Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams,
and annular preventer from 13 3/8" casing point to T.D.
Directionally drill 12 1/4" hole to 8754'+ TVD. Run 9 5/8" 47# L-80 Buttress
casing to 8754' TVD and cement first stag~ with 1735 cu. ft. cement. Cement
second stage through D.V. packer collar at 2600'+ with 130 cu.ft. Permafrost C
cement. 9 5/8" casing will be h~ at surface, ~he 9 5/8" x 13 3/8" annulus
will be Arctic Packed.
Directionally drill 8 1/2" hole to T.D. at 9647'+ TVD. Cement 7" liner to
500' inside 9 5/8" casing shoe with 320 cu. ft. Crass G cement with 18% salt.
Run 4 1/2" 12.75~ L-80 CS Hydril tubing with 5 gas lift mandrels and a pro-
duction packer assembly at 8348'+ TVD. A subsurface safety valve with dual
control lines will be placed at 2000'+. Displace tubing to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of proposed
perforations to be sutmLitted on Sundry Notice to follow.
OZ
04.
O!
02
04
20
30
I BSO' ¥ - 6
28
.~I[Pr°p°~ed)
PORTION OF
SCALE
-q
Tll N, RlaE, UM
I": I/2 MILE
T. IlN
T. I0 N
· CCNOUCTOF~ HCL~S
CERTIFICATE OF SURVEYOR
i hereby certify that lam properly registered to
p:acti^e land surveying in the State of Alaska and that this plat
represents a location survey of the wellpad sho,,n and Che wells
thereon. This survey was made by me or under my supervision
and oil dimensions and other details are correct. Bottom hole
locations are furnished by others.
Date Surveyor
NOT--_
(ZZ-27'-11-I$ ]
l' 14-27-11-1.~ )
SUMP
o
Plat doted Aug. 30, '-279 chc,"gad to
0:' 2, 19-'9. B~ttom ~'::e Io':.I, SB
6
r F.p c
C.J.R
PAD "Y':
LocateJ in
Surveyed for
SOHIO PETROLEUM, CO.
~ ,-,,,~,..,.--~- ~'-"'"--- ,.>,
S~-ve~e~ by
misstl~.M. LINDSEY E ASSOC.
LAb~ ~, HYDRCGRAPHIC SURVEYORS
Box 4-C~l
C~ECK LIST FOR NEW ~L PERMITS
Is the ~ermit fee attached ..........................................
Is %~11 to be located in a defined pool .............................
3. Is a registered survey plat attached ................................
e
Company
Yes No
Is ~11 located proper distance frcm property line .................. ~,,~
Is well located proper distance frcm other wells ....................
~ sufficient unde~icated acreage available in this pool .....
) well to be deviated ...................................
~ operator the only affected party .................................
Can permit be approved before ten-day wait ..........................
Does ~operator have a bond in force ..................................
Is a conservation order needed ......................................
?. Is administrative approval needed ...................................
3. Is conductor string provided ........................................
·
!~ enough cement used to circulate on conductor and surface ......... ~__
'°~1 c~nent tie in surface and intermediate or production strings ... ~
' }1 cement cover all known productive horizons ..................... ~
¥~ill surface casing protect fresh water zones ....................... ~
Will all casing give adequate safety in collapse, tension and barst.. ~
Remarks
Does BOPE have sufficient pressure rating - Test to ~dg~(> psig .. ~
Approval Reccmmended:
Item Approve Date
(1) Fee ~"~ !
/
(2) I~x~. ~~
-]ditional Requirements:
Engin~er..ing:
rev: 12112/79
Well Histocy File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
11 000000 7777777777 000000
11 OOOO00 7777777777 000000
1111 00 O0 77 00 00
1111 00 00 77 O0 00
II 00 0000 77 00 0000
11 00 OOOO 77 00 O000
11 O0 U0 O0 77 O0 O0 00
ll O0 OU O0 77 O0 00 O0
11 0000 OU 77 0000 00
11 0000 O0 77 0000 00
11 O0 O0 77 O0 O0
11 O0 00 77 O0 O0
11111! 000000 77 000000
111111 000000 77 000000
7177777777
7777777777
77
71
77
77
77
'17
77
77
77
77
7;
77
bbbbbb 000000 333333 333333
066o6o 000000 333333 333333
o6 O0 O0 33 33 33 33
66 O0 O0 33 33 33 33
66 00 0000 33 ~3
66 O0 0000 33 33
66066066 00 00 O0 33 33
00060006 O0 O0 O0 33 33
~ 60 0000 O0 33 33
66 06 0000 O0 33 33
66 66 O0 O0 33 33 3J 33
h6 oo O0 O0 33 33 33 33
~0oob~ 000~00 333333 33~33
606o0~ 000000 333333 333333
666666
666660
66
06
60
66
06066660
66660606
66 06
66 66
66 Ob
66 66
666666
666066
,$TAF~I* U,SEI~ PCAL 110707,00.~36] d£}8 SHiP SE(~. 765] DAlk, 12-dUN-.80 22:31:23
MUNITCJR ~b kG10~_,37 APk-~O. *START*
*START* U$~I~ PCab t107ol,60336] dOB 8HIP 8gU. 7053 I)ATk 12-dUN-80 22:31:23
MUNII't~R oW$ KL10k37 AP[~-80. *STARI'*
11iiii
IlllIl
ii
11
1I
1I
Ii
II
I1
II
I1
1II111
1iiii1
~F
YY
YY
YY
YY
0000o0 0000o0 666666
000oo0 ouOOOu 66666b
Ou QO O0 O0 bb
O0 UO (;O O0 Ob
O0 0000 O0 O00O 66
00 0Or)0 O0 OOOO bb
O0 O0 O0 O0 O0 O0 b6666666
O0 O0 OO O0 O0 UO bb666666
0000 O0 0000 00 66 66
0000 O0 0000 00 66 66
O0 O0 O0 O0 6o bO
OO O0 O0 O0 06 66
000000 o00000 606666
000000 OOO000 666666
MU~JTU[4 bwb ~Llf)kJ7 APR-uO. *START*
f16~: DSNH:VERI~.O0~<O5Z>[10107 bOJ3bj C~AI'kO:
(JUEUf Sw ~ I'CHES: /f li, f. :FURT
/SPACING:I /LIMI'I:84 /FURMS:NOhMAL
7653 OA£5 12-dUN-80
12-dUN-80 22:24:51
22:31:23
SCHLUMBERGER CUMPUTiNG CENT~,R
10'707.60336
i,r_,hiG"l'n: 132 bYTES
RgP_, b NA~IE: P.C.A.J,.
RLkL CONT1NUATI~JN NUMbeR: O~
Ci}~M~N1S: LI6 ~U~MAT CU3TUtqER
I'AFi:,
DALE: 80/ 6/12
l,kNGl'it: 132
[APL NAMk: bO)3b DATE: 80/ 6/12
~APk Ct. JNI'INUATLL}I~ N[JM~E~: 01
PREVIUU6 1AP~ NAME:
CflMMLNIS:
qAPB CU~MEN'I5
CASING D~IL&E~ 9.~258104O7/BIT SIZ5 8.5/FLUID TYPE ~GM/
DkN6 9.9/VlSC 45/PH 9/~LUID lOSS 5.8 Mb/BM 2.55~58
N~IF 2.25[a58 ~/~MC 2.8/58 F/MAX RBC TMP 192 ~/
TAKEN ~i{OM RUN~2 OIL LUGGED 4~AR80
~'lk~(;kD wi'lB b0335(DIL)
FILE
bkNGfn: b2 BYTES
F1. L?. NAt~B: EDtT .001
MAXII'~UM PHXSICAb BECURD LENGTH:
FREV ,~ [jLl~ FILE NAME:
102~ BiTg8
WkLl, 51'Ii
C[IMPAN
WELL:
F i [",I,D
HANG,%,:
[~JWN:
~ECT l
('(iii N t
] NP [JHHATILIN
177 B~TbS
RkCORD
SOHIO ALASsA PETHU.
PRUDHGE BA~
lin
N. SLOPE
ALASKA
CO.
DA[A ~U~MAJ' SP~CIFICAIi[JN
b~NGI~: 650
$1Z~
1
~EP COD~ ENTRY
66 0
I')A ['LI~I ,SPJ~,Cli; J. CA'I'ILIN oLLJCK,5:
EaTR~
!
2
3
4
5
7
q
! O
~5
DLPT
bP
ILD I)16
IbM Plb
LLSU
GR
GH C NL
CALl CNL
D~HO ~ DC
N~HI CNG
HHOB CNb
NEAT CNh
NCNL CN6
~ CNL CN6
GP BHC
UI SHC
UNITS APl AP1 AP1 APl
E T 0 0 O O
M V 7 1 0 O
OHMN ? 12 40 0
UHM~ 7 12 44 0
OHMN 1 22 8 O
GAPI 7 31 32 0
GAP I ~2 3 1 32 0
IN ~2 28 I 0
G/C ~ 42 4 ~ 0 O
PU ~2 68 2 0
G/C3 42 35 I 0
C/C 42 ~2 1 0
CPS ~2 34 92 0
CPS 42 34 93 0
GAPI 60 31 32 0
lJSl~ bO 52 32 0
8IZ~ EAP
0 4 0
0 4 0
0 4 0
0 4 0
0 4 0
0 4 0
0 ~i 0
0 4 0
0 4 0
0 4 0
0 4 0
0 4 0
O 4 0
0 4 0
0 4 0
0 4 0
PROC SAM REP D~PT
0 1 O8 0
0 I 08 0
0 1 08 0
0 1 68 0
0 1 68 0
0 1 /:,8 0
0 1 b8 0
0 1 b8 0
0 1 u8 0
0 1 b8 0
0 I b8 0
0 1 b8 0
0 1 68 0
0 1 68 0
0 1 08 0
0 1 68 0
SHIFT
DI: P'I'H
11fi64.000
11600.0O0
11500.000
11 40o. 000
11300.000
11200.000
1 i I OO. 000
000. 000
109u0.000
lOaOO.OOO
1oloo.ooo
mNLMLIN IC
F C N I~,
G~
~CN6
bP
G~
NPHI
NPBI
1; CNb
SP
GR
?'CNL
SP
GR
NPHI
~CNL
SP
GR
NPH 1
I. CrJb
,St-'
GH
NPtti
I'CNL
i~CNb
I,{PHi
i~ C ~ L
VALUF.
-41.219
112.063
0.814
10~28.000
-42.0OO
112.063
25.439
959.500
-51.825
112.O6]
13.770
2240.000
-105.438
112.063
20.752
14qO.O00
-53.03J
112.063
21.289
1490.000
-122.500
]12.06~
2~.b09
1228.000
-120.938
1i2.063
19.385
1418.000
-113.000
112.0o]
1b.650
1594.0o0
-12b.875
112.063
2].926
1151.000
-11o.31]
112.063
21.240
1235.000
-70.000
1 { 2.063
30.811
776.000
ILL
GR
G~
IbD
IkH{)B
ILO
GR
GR
GR
RflO~
GR
ILO
Gi~
i-(HOB
GR
lbo
GR
ILD
GS
GR
lbo
GR
Gl+
GH
HHUB
G~
ILD
GR
GR
VALUE
¢.516
1122.000
2.!04
128.125
4.348
140.500
2.658
128.125
9.242
i08.~13
2.646
10].125
~.570
28.203
2.455
22.250
8.0{0
80.688
2.709
82.063
1.648
20.844
2.229
24.141
3.633
24.516
2.~93
21.734
2.533
39.219
2.b41
32.031
10.281
28.703
2.363
24.141
10.672
41.b25
2.373
35.281
13.133
136.125
2.959
132.315
MNLMONIC
CALl
NRA~
DI
IGM
CALl
NRAT
OI'
CALl
NRAT
DT
ibm
CALl
UT
CALl
bT
CALl
bRAT
UT
ibm
CALl
NRAT
OT
ILM
CALl
CALl
NRAT
DY
CALl
NHAI
CALl
NRAT
VALUg
4.473
8.500
1.144
74.000
4.285
8.570
2.723
73. 150
8.625
8.359
1.920
68.56]
3.920
8.109
2.371
78.750
7.797
8.503
2.441
74.000
1.805
8.039
2.623
88.000
4.016
7.945
2.204
81.188
2.005
8.094
2.094
73.188
8.820
U.094
2.580
86.750
15.164
8.094
2.402
87,563
10.555
9.172
3.127
76.000
MNEMONIC
bL8U
DRHU
NCNb
hhSO
oRHU
NCNh
LLSU
DRHU
NCNb
DRHO
NCNb
bb8U
DRHu
NCNb
bb8U
ORHU
NCNb
bh80
DRHU
NCNb
bb8O
DRHU
NCNb
Lb80
DHHO
NCNb
LLSU
ORflU
NCNb
bb8U
ORHO
NCNb
VA~Um
5.18~
0.002
llblb. O00
4.710
0.101
2520.000
12.211
0.050
4400.000
9.680
0.003
3400.000
8.195
0.057
381~.000
4.19i
0.023
3172.000
~.305
0.088
3228.000
5.379
O.Ob4
3084.000
14.195
0.042
2990.000
19.859
0.07]
3136.000
11.586
-0.027
2522.000
DI~P].' H
10600.000
10gU0 o 000
10400. 000
! 0 ]oU. 000
10200.000
10100.000
10000.000
9qOO.O00
9800.000
9700.000
9090.000
MN~Mt,INIC VAbUE.
&~UN1C
VALUE
MNk,~uNIC
8P -67.188 IbD 2.211
GE 112.003 GA 125.o88 CALl
I~PMJ 39.097 RHUB 2,412
FCNIJ 450.250 GR 117.500 DT
GR
GR
5F
GE 112
NPHI 35
~Cl~h 504
1.410
115.000
2.453
99.750
.~75
.OOJ
.840
.250
aP -]9,594 ILD 1,442
GE 111.875 GR -999.250
NPHI -99925.000 RHOO -999.250
~CNI, -999.250 GR -999.250
5P -39.150 16D 1.402
GH 113.188 GR -999.250
NPttl -99925.O00 RHUB -999.250
~CNL -999.250 GR -999.250
SP -39.969
NPHI -99925.000
FCNb -999,250
IUD
GR
GR
16D
GE
Gl:4
GR
.EH{lB
GH
IuD
GR
RfliJB
SP -42.000
GR 75.563
NPHI -99925.000
~CNb -999.250
SP -41.81J
b~ 78.000
NPHI -99925.000
kCNb -999,250
2.438
-999.250
-999,25o
-999.~50
2.744
-999,250
-999,250
-999.250
2,586
-999.250
-999.250
-999.250
1,490
-999.250
-999.250
-999.250
5P -41.500
GR 98.56]
NkHI -99925.000
kCNL -999.250
~P -42,375 ILL 1.407
GP 108.500 G~ -999.250
NPHI -99925.000 RHOB -999,250
kCNb -999.250 G~ -999.250
8P -50.500 [6D 1.509
GA 105.125 GR -999.250
,,P~I -99925.000 HHtJB -99q.250
~C~6 -999.250 GR -999.250
1,745
-999,250
-999,250
-999.250
SP -52,250
G~ 99.625
NPHI -99925.000
fCNL -9q9.250
CALl
Lq'
CALl
ibm
CAbi
NRA1'
bT
CALl
NHAI
IbM
CALl
NHA~
UT
IbM
CALl
NRAT
DT
IbM
CALl
NRA'I
DT
CALl
DT
1bM
CALl
NRAI
1317
CALl
NRAT
UT
VALUE
2.207
11.758
100.315
1.552
13,188
3.b4b
108.563
1.719
-999,250
-999,250
-999,250
1.480
-999.250
-999,250
-999.250
2.572
-999.250
-999.250
-999.Z50
2.91b
-999.250
-999.250
-999.250
2.19]
-999.250
-999.250
-999.250
1.58/
-999.250
-999.250
-999.250
1.509
-999.250
-999.250
-999,250
1.571
=999.250
-999.250
-999,250
1.843
-999.250
-999,250
-999.250
MNEMONIC
LLSU
DRHO
NCNb
bbBU
ORHU
NCNb
6680
DRHU
NCNb
6L8U
DRHO
NCNb
668u
DRHO
NCNb
6680
DRHO
NCNb
6LBU
DRHO
NCNb
668U
DRHO
NCNb
6680
DRHO
NCNb
668U
DRHO
NCNb
6680
DRHU
NCNb
VALUE
3.b5]
0.071
lbb6.000
2.30]
u.100
1720.000
3.271
-999.250
-999.250
2.375
-999,250
-999.250
3.062
-999.250
-999.250
5,4]4
-999.250
-999.250
4.08b
-999.250
-999.250
Z.512
-999.250
-999,250
2.424
-999.250
-999.250
2.41b
-999.250
-999.250
2,824
-999.250
-999.250
9500.000
9400.000
9:300.000
9;)()0. 000
91 O0. 000
9000.000
89(.)0. 000
~00.000
H700.O00
HOo0.O00
HSO0. 000
MNbNUNlC VAEUL
-4~i.719
'19. 125
rJPnl -99925.000
rCNI, -999.250
LMUNIC
VALUE
2.633
-999.250
-999.250
-999.250
bP -3q.bSH ILD 1,213
GE 113,063 GR -999.250
NFHI -99925.000 R~OB -999,250
~CN6 -999.250 GR -999,250
ILD
GH
HHOB
GR
SP -]~.719
GR 105,438
NPH1 -99925.000
bCNL -999.250
1.091
-999,250
-999.250
-999,250
SP -31.313 IbD 1.095
GM 111,b25 GR -999,250
l~Pnl -99925.000 HRi.)O -999,250
~CNI., -999.250 GH -999.250
SP -28.109 IbD
G~ 101.938 GE
NFH1 -99925.000 RHI)B
~Cl4b -999.250 G~
bP -32.000
GR 97.125
NPHi -~9925.000
fca6 -999.250
iLD
1.125
-999,250
-999.250
-999.250
1.412
-999.250
-999.250
-999.250
MN
~,M(]NIC
ILM
CALl
ibm
CAbl
NHAT
CAL 1
NRAi'
DT
ibm
CALl
NHAT
DT
ibm
CALl
NRA'I
CALl
NEAt
DT
VALU~
2.861
-999.250
-999.250
-999.250
1.283
-999.250
-999.250
-999.250
1.159
-999.250
-999.250
-999.250
1.181
-999,250
-999,250
-999,250
1.203
-999.250
-999.250
-999.250
i.491
-999,250
-999,250
-999,250
MNLMONIC
6680
DRHO
NCNb
LBSU
DRHO
NCNb
6680
DRHO
NCNb
hLBO
DRHU
NCNb
bbBO
DRHU
NCNb
6LSU
DRHU
NCNb
SP -3b.406 1LD 1.754 IbM 1.826 6680
GR 99.375 GR -999.250 CALl -999.250 DRHO
NPHI -99925.000 RHUB -999.250 NRA% -999.250 NCNb
~CNL -999.250 GR -999.250 Ul' -999.250
SP -~7.~75 ILD 2.266 IbM 2.268 bb8O
GR 177.125 GR -999.250 CALl -999.250 URHO
NPHI -99925.000 RHUB -999.250 NRAI -999.250 NCN~
fCNG -999.250 GR -999.250 DT -999.250
1.992
-999.250
-999.250
-999.250
2.477
-999.250
-999.Z50
-999.250
SP -35.000 ILD 1.811
Gk 244.500 GR -999.250
NPHI -99925.000 R,UB -999.250
~Cmh -999.250 GR -999.250
bP -39.375 ILD 2.441
GM 174.875 GR -999.250
NPHI -99925.000 RHOB -999.250
~CNL -999.250 G~ -999.250
IbM
CALl
NRA I
Dt
ILM
CA61
NEAT
ibm
CALl
NRA~'
DT
SP -~3.719 iLD ~.112
GE 119.563 GR -999.250
NPH1 -99925.000 ~HOB -999.250
FCNIa -999.250 G~ -999.250
3,398
-999,250
-999.250
-999.250
bbBO
DRHU
NCNb
b68U
DHHU
NCNb
668U
DRHU
NCNb
VAbUL
3.195
-999.250
-999.250
1,8lb
-999,250
-999,250
1.718
-999.250
-999.250
1.731
-999.250
-999.250
1.BZb
-999.250
-999.250
2.107
-999.250
-999.250
2.bbb
-999.250
-999.250
5.869
-999.250
-999.250
3.137
-999.250
-999.250
4.168
-9~9.250
-999.250
7.320
-999.250
-999.250
UkP rH
000
8200.000
8 ! O0. 000
8000.000
790O. 000
I~U0.O00
770o.000
7600,000
7qO0.O00
MNkMU¢IC VAbU[L
MN
ZMUN lC
SP '47.531 ILD
GB 135.250 GR
NCHI -99925.000 RHUB
~Cl~b -999.250 G~
8P -30.344
GH 189.O00 GR
NPHI -W9925.0Oo RMUb
~CNL -999.250
SP -30.344 ILD
Gh 129.625 GR
NPHi -99925.000
~CI~L -999.250 GR
'30.750 iI,D
132.875 G~
-99925.000 RHUB
-999.250 GR
SP -27.234
GR 90.500
NPHI -99925.000
fCNb -999.250
5P -2B.375
GF 94.563
NFH] -99925.000
fCNh -999.250
6P -27.250
GR 99.250
NPHi -99925.000
fCNh -999.250
6P -24.703
GA 95.500
NPHI -99925.000
~CNb -999.250
SP -25.2b0
Gm 92.125
NPHi -99925.000
fCmb -999.250
~P -25.750
GR 83.375
NPHI -99925.000
PCNL -999.250
SP -25.359
GM 72.438
NPH1 -99925.000
~Cab -999.250
1LD
GR
hHUB
GR
GR
GR
ILD
GR
RHUB
GR
lbD
GR
ILD
GR
GR
1LD
GR
RHUB
GH
ILD
GR
GR
VAI,UE
2.768
-999.250
-999.250
-999.250
1.43]
-999.250
-999.250
-999.250
1.356
-999.250
-999.250
-99g.250
1.736
-999.250
-999.250
-999.250
2.006
999.250
-'999.250
-999.250
1.998
-999.250
-999.250
-999.250
1.977
-999.250
-999.250
-999.250
2.186
-999.250
-999.250
-999.250
2.182
-999.250
-999.250
-999.250
2.537
-999.250
-999.250
-999.250
1.784
-999.250
-999.250
-999.250
MN
~M(}N lC
IbM
CALk
NRA'I
CALl
NRA'i
ibm
CALl
NRAT
Ul
IbM
CALl
NRAI'
CALl
NRA1
DT
IbM
CALl
uT
CALl
NRAT
DT
1bM
CALl
NBAI
DT
ibm
CALl
NHAT
IbM
CALl
N~AI
ILM
CAbi
NRAT
DT
VALUE
2.813
-999.250
-999.250
-999.250
1.539
-999.250
-999.250
-999.250
1.330
-999.250
-999.250
-999.250
1.839
-999.250
-999.250
-999.250
2.148
-999.250
-999.250
-999.250
2.068
-999.250
-999.250
-999.250
2.063
-999.250
-999.250
-999.250
2.266
-999.250
-999.250
-999.250
2.373
-999.250
-999.250
-999.250
2.011
-999.250
-999.250
-999.250
1.722
-999.250
-999.250
-999.250
MNEMONIC
LLBU
DRHU
NCNb
bLSU
DRHO
NCNb
bbSU
DRHO
NCNb
bh8U
DRHO
NCNb
LLSU
DRHU
NCNb
LhSU
DRHO
NCNb
hbSO
DRHU
NCNb
bbSd
DRHO
NCNL
DRHO
NCNb
bhSU
DRHO
NCNb
hhSU
DRHtJ
NCNb
VALUE
4.020
-999.250
-999.250
2.012
-999.250
-999.250
2.232
-999.250
-999.250
2.7~4
-999.250
-999.250
3.025
-9~9.250
-999.250
2.~93
-999.250
-999.250
2.803
-999.250
-999.250
3.078
-999.250
-999.250
3.496
-999.250
-999.250
4.27~
-999.250
-999.250
2.105
-999.250
-999.250
7
Df~ P~l H
7 ~00. 000
72u0,000
7100,000
7OOU.O00
bqO0.O00
bSuO.
6700.000
669O. OOO
6500.000
biO0.O00
MNLMUNIC YALUL
SP -25.453
GR 94.125
NJ'HI -99925.000
~CNL -999.250
$P '22.10 3
GB 73.375
NPI'ti -99925.000
I'CNL '999. 250
1LD
GR
RHUB
Gl{
lad
GR
GR
-25.250 ILD
119.O25 GR
-99925.000 RHOB
-999.250 GR
SP -27.266
GM 105.188 GP
NPHI -99925.000 RHOB
~CNb -999.250 GR
-29.141
98.000
r4PHI -99925.000
PCNL -999.250
bP -30.188
GU 88.375
Nkftl -99925.000
~CNL -999.250
6P -29.891
GM 89.56t
NPHi -99925.000
~('NL -999.250
SP -j1.094
GR 77.500
NPH1 -99925.000
fCNL -999.250
8P -37.156
GR 78.938
NPH1 -99925.000
FCNb -999.250
bP -57.844
GR 81.31~
NPHI -99925.000
fCNb -999.250
SP -66.81~
G~ 82.625
NPH1 -99925.000
~CNL -999.250
RHUB
GR
ILD
Gl{
RHUB
GR
ILD
RHUB
GR
GR
GR
ILD
Gl{
GR
GR
GR
RHUB
VALU~
3.740
-999.250
-999.250
-999.250
4.137
-999.250
-999.250
-999.250
3.197
-999.250
-999.250
-999.250
3.898
-999.250
-999.250
-999.250
4.238
-999.250
-999.250
-999.250
3.285
-999.250
-999.250
-999.250
3.082
-999.250
-999.250
-99g.250
3.123
-99g.250
-999.250
-999.250
~.602
-999.250
-999.250
-999.250
4.734
-999.250
-999.250
-999.250
5.246
-999.250
-999.250
-999.250
MNEMONIC
ILM
CALl
NRAT
DT
CALl
NHAI
O~
IbM
CALl
NRA~
1bM
CALl
NRAT
DT
IbM
CALl
NRA'I
DT
CALl
NRAT
UT
ibm
CALl
NRAT
D~
IbM
CALl
NRA%
DT
IbM
CALl
NRAI
DI
IbM
CAUl
NRA1
DT
ibm
CALl
NRAT
UT
VALU
.
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999.
-999.
.
-999.
-999,
-999.
.
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999.
-999.
857
25O
250
25O
109
250
250
250
227
250
250
250
020
250
250
250
398
250
250
250
201
250
250
250
994
250
250
250
256
250
250
250
029
250
250
250
496
250
250
250
973
25O
250
250
MNkMONIC
bhSU
DRHO
NCNb
LLSU
DRHU
NCNb
bbSU
ORHO
NCNb
LbSU
DRHU
NCNb
hbSO
DRHO
NCNb
bbSU
DRHO
NCNb
bbSU
DRHU
NCNb
b~SU
DRHO
NCNb
bbSU
DRHU
NCNb
hbSO
DRHU
NCNb
bbSU
ORHO
NCNb
VALU~
5.188
-999.250
-999.250
5.2?0
-999.250
-999.250
4.309
-999.250
-999.250
5.043
-999.250
-999.250
5.~28
-999.250
-999.250
4.023
-999.250
-999.250
-999.250
-9~9.250
4.305
-999.250
-999.250
4.184
-999.250
-999.250
7.371
-999.250
-999.250
~.016
-999.250
-999.250
61 oU. O00
bOo0. 000
5~00. 000
5800.000
570U.000
5500. 000
%500.000
5400. 000
5:1 ~,, O. 000
520U,000
MN~NUNiC VALUE
72.938
NPHI -99925.000
~CNL -999.z50
SP -47,875
GE 72.b88
NP.I -99925,000
~CNL -999,250
SP
G? 64.188
NPH1 -99925,000
fCNL -999.250
SP -111.93N
GR 53.531
NPNI -99925.000
kCNL -999.250
bP -121.875
GR ~4.375
NPHi -99925.000
fCNL -999.250
Si' -120,188
GR 48.56]
NPHI -99925,000
PCNL -999.250
MNLMUNiC
GR
[{HOB
GR
1Lb
GR
RHOB
GR
ILD
GR
OR
ILD
GR
OR
lbo
GR
RMOB
GR
VALU
-999.
-999.
-999.
0
-999.
-999.
-999.
·
-999.
-999.
-999.
.
-999.
-999.
-999.
·
-999.
-999.
-999.
.
-999,
-999.
-999.
8F -88.688 IbD 2.
GR 52.188 GR -999·
NPHI -99925.000 ~HUB -999·
~CNI, -999.250 GR -999.
ILD
GR
HMUB
GR
6P -95.375
GR ~3.438
NPhl -999d5.000
~CNL -999.250
SP -92.688
GR 64.688
NPHI -99925.000
fCNL -999.250
SP -11o.188
GR 48.625
NPHI -99925.000
~CNL -999.250
SP -78.875
GR 55.188
NPHI -99925.000
PC'NL -999.250
GR
RHOB
GR
I LD
GR
GR
GR
RHUB
G~
-999
-999
-999
0
-999.
-999·
-999.
·
-999.
-999·
-999.
·
-999.
-999.
-999.
889
250
25O
25O
320
250
250
250
482
250
250
250
876
250
250
250
324
250
250
250
348
250
250
250
~77
250
25O
250
518
25O
250
25O
189
25O
25O
250
472
250
25O
250
178
250
250
250
MNEMONIC
1LM
CALl
NRA~
bT
IbM
CALl
NRAI'
DT
kLM
NRAT
CALl
N~AI
DT
CALl
NRAT
IbM
CALl
NRAI
OT
1bM
CALl
NRAT
UT
CALl
NRAI
01
ILM
CALl
PT
kLM
CALl
NRAT
OT
IbM
CALk
NRAT
DT
VALU
.
-999.
-999.
-999.
0
-999.
-999.
-999.
·
-999.
-999.
-999.
0
-999.
-999.
-999.
-999
-999
-999
i .
-999.
-999.
-999.
-999.
-999.
-999.
.
-999.
-999·
-999.
.
-999.
-999.
-999.
·
-999.
-999.
-999,
0
-999,
-999.
-999.
227
250
250
Z50
56J
250
250
250
043
250
250
250
459
250
250
250
716
250
250
250
573
25O
25O
250
014
250
250
250
170
250
250
250
744
25O
250
25O
771
250
250
250
516
25O
25O
25O
MNEMONIC
bbSO
DRHU
NCNL
bbSU
DRHO
NCNb
6680
DRHO
NCNb
6L80
DRHU
NCNb
6680
DRHU
NCNb
bbSU
DRHU
NCNb
bbSO
DRHO
NCNb
DRHO
NCNb
6580
ORHO
NCNb
LLSU
[)RHO
NCNb
b68U
DRNU
NCNb
VAbUL
lO.b09
-999.250
-999.250
6.402
-999.250
-999·250
10.625
-999.250
-999.250
10.805
-999.250
-999.250
5.7bb
-999.250
-999.250
7·652
-999·250
-999.250
1.703
-999.250
-999.250
~.73~
-999.250
-999·250
8.055
-999·250
-999.250
5.184
-999.250
-999.250
5.191
-999.250
-999.250
[)LP'I H
51 (30. O00
5O00. 000
4qO0.O00
48U0.000
4700.000
460U.000
4500.000
q%UO.O00
42O0. O00
%100.000
MNLMONiC
SP
GR
NPMI
G~
NPHI
SP
GR
NPHI
GR
NPttI
PCNL
SP
[' C N L
SP
GR
NPHI
PCNb
SP
GR
NPHI
~ CNI,
SP
GR
NPttl
[-CNL
SP
NPMI
SP
GR
NPH1
PCNL
GR
NPHI
P CNb
VA
-8
5
-9992
-99
-7
-999?
-99
5
-9992
-99
-5
-9992
-99
-12
-9992
-99
-10
7
-~992
-99
-7
6
-9992
-99
-6
-9992
-99
-10
6
-9992
-99
-14
-9992
-99
-8
@
-9992
-99
LU
4.
5.
9,
O.
5.
9.
.
g.
5.
q.
.
1.
5.
9.
O .
l.
5.
9.
0.
5.
9.
.
.
8.
5.
9,
.
3.
5.
9.
I .
0.
5.
9.
.
3,
5.
9.
563
O00
250
75O
000
250
656
000
250
4]8
281
000
250
375
938
000
250
375
188
000
250
81~
75O
000
250
063
938
000
250
313
188
000
250
25O
844
000
250
625
7'5O
000
250
MNLMUN1C
GR
GE
iLD
RHUB
GR
ILO
GR
RHOD
GR
GH
GR
lbo
GR
RHUB
GR
RHOB
GR
ILD
GR
RHUB
GR
GR
GR
IbD
GE
RHOB
GR
ILO
RHOB
GR
lbo
GR
RHO~
GR
VAb
2
-999
-999
-999
2
-999
-999
-999
3
-999
-999
-999
5
-999
-999
-999
2
-999
-999
-999
3
-999
-999
-999
8
-999
-999
-999
-999
-999
-999
2
-999
-999
-999
2
-999
-999
-999
5
-999
-999
-999
U L
.008
.250
.250
.250
.805
.250
,250
.250
.457
.250
.250
.250
.055
.250
,250
,250
,688
.250
.250
.250
.090
,250
.250
,250
.977
.250
.250
.250
.984
.250
.250
.250
.957
.250
.250
.250
.750
.250
.250
.250
.250
.250
.250
Mm~.MONIC
CALl
NRAT
IbM
CALl
NRAT
OT
CALl
NRA'[
IbM
CALl
NRAI
DT
IbM
CALl
DT
ILM
CALi
N~AI
1bM
CALl
NRAT
DT
CALl
Ni.~A T
Ol
CALl
NRAT
iLM
CALl
NRAT
ibm
CALl
NRAi
VALUE
2.236
-999,250
-999.250
-999,250
2.973
-999,250
-999.250
-999,250
3.877
-999,250
-999,250
-999.250
4.898
-999,250
-999.250
-999.250
3.104
-999.250
-999,250
-999.250
3.520
-999.250
-999.250
-999.250
8.250
-999,250
-999.250
-999,250
4.063
-999.250
-999.250
-999,250
3.131
-999.250
-999.250
-999,250
~.076
-999.250
-999,250
-999.250
4.828
-999.250
-999.250
-999.250
MNEMONIC
LLSU
DRHO
NCNb
bbSO
ORHU
NCNb
bbSO
O~HU
NCNb
GLSU
DRHU
NCNb
bbSO
DRHO
NCNb
LbSU
DRHO
NCNb
LbSU
DRHU
NCNb
bbSO
DRHU
NCNb
bbSO
DRHO
NCNb
bbSO
DRHO
NCNb
bbSO
DRHO
NCNb
VALUE
-999.250
-999.250
4.~17
-999,250
-999.250
7,~49
-999.250
-999.250
b.590
-999.250
-999.250
8.150
-999.250
-999.250
1,762
-999.250
-999.250
13.188
-999.250
-999.250
5.273
-999.250
-999.250
4,088
-999.250
-999.250
6,398
-999,250
-999,250
6,004
-999.250
-999.250
3qu0.O00
~800. 000
3700.000
3600. 000
]500. 000
3400.000
3300.000
3200.000
] 1 O0. OuO
3000.000
MN[' MbN1C VALU~
SP -107.500
GM 62.813
NPHI -99925.000
~CNb -999.250
MNEMONIC
lbo
GR
GR
VAL
5
-999
-999
-999
8P -84.000 ILD 7
GE 74,250 GR -999
NPHI -~9925.O00 RH()8 -999
~NL -999.250 GR -999
SP -85,500 1LD 4
GR 83.313 GR -999
NPHI -99925.000 R}lOb -999
FCNL -999.250 GR -ggg
6F -90.750 ILD 7
GR 73.688 GM -999
NPHI -99925.000 BHUB -999
~CNb -999.250 GR -999
bP -117.250
GR 44,781
NPHI -99925.000
~CNL -999.250
GR
GR
7
-999
-999
-999
6P -90.125 lbo 8
GH 15,250 GR -999
NPHI -99925.000 RHOB -999
~CNL -999,250 GR -999
8P -95,750 iLO 8
G~ b8,938 GR -999
NPHI -99925.000 RHOB -999
~CNL -q99.250 GR -999
8P -89.000 [LD 7
OR 79.563 GR -999
NPHI -V9925.000 RHOB -999
~CNb -999,250 GR -999
SP -94,125 JLD
GM 61.250 GR
NPHI -99925,000 RHOB
~CNL -999.250 GR
-999
-999
-999
6P -84.563 iLD 6
GR 70,375 GR -999
NPHI -99925.O00 MHtJB -999
PCNb -999,250 GR -999
5P -104.b25
GR 62,531
NPH1 -99925.000
~CN6 -999.250
ILD
HHOb
GR
5
-999
-999
-999
UE
.395
.250
.250
.250
.074
.250
.250
.250
.250
.250
.250
.301
,250
.250
.250
.051
,250
,250
.250
.609
,250
.250
.250
.Ob3
.250
.250
.250
.230
,250
.250
,250
.15b
.250
.250
.250
.758
.250
.250
.250
.125
.250
.250
.250
~i~.MONIC
ibm
CAbI
PT
AbM
CALl
NRAI'
IbM
CALl
ILM
CAbI
NRAI
DT
CALl
NRAT
DT
ibm
CALl
NRAT
DT
CALl
NRAT
DT
ILM
CALl
NRA]~
DT
ibm
CALl
NhAT
DT
ILM
CALl
I~I~AT
O1
IbM
CADI
NRA'I
DT
VALUE
0.207
-999.250
-999.250
-999.250
6.97]
-999,250
-999,250
-999.250
3.781
-999.250
-999,250
-999.250
7.181
-999,250
-999.250
-999.250
7.566
-999.250
-999.250
-999,250
7.977
-999.250
-999.250
-999,250
8,375
-q99.250
-999,250
-999,250
7.195
-999.250
-999.250
-999.250
8.461
-999.250
-999.250
-999.250
6,930
-999,250
-999.250
-999,250
5.832
-999,250
-999,250
-999.250
MN~M£JN IC
bbSU
ORHO
NCNb
bLSU
OHHO
NCNb
bhSU
DRHO
NCNb
bLSU
ORHO
NCNb
bbSU
DRHO
NCNb
DRHO
NCNb
bbSO
ORHO
NCNb
bbSO
DRHO
NCNb
bLBU
OReO
NCNb
bLSU
DRHU
NCNb
DRHO
NCNb
VALUE
10.492
-999,250
-999,250
9,484
-999.250
-999.250
5.180
-999.250
-999,250
9,414
=999.250
-999,250
-999.250
-999,250
10.211
-999.250
-999.250
11.313
-999.250
-999.250
10,281
-999,250
-999.250
1i.344
-999,250
-999.250
i0.703
-999.250
-999.250
8,945
-999,250
-999.250
D~PTM
2.900.000
2HO0.OUO
2700,000
2680.000
MNkN{JNIC VALUk
VAL
~P -74.000 lCD 4
G~ 50.088 GR -999
NP.I -99925.000 RBOG -999
?CNL -999.250 GR -999
5P -60.813 £bD 3
GR 62.938 GR -999
NPM1 -99925.000 ~fltJS -999
~CNt, -999.250 GR -999
8P -Sb. O00 1LD ]
GR 62.Y19 GR -999
NPHi -99925.000 RIiUB -999
FCNL -999.250 G~ -999
SP -54.500 lCD
GR 40.750 GR
NPHI -99925.000 RHOB
~CNL -999.250 Gh
161l
-999
-999
-999
UE
..t13
.250
.250
.250
.064
.250
.250
.250
.385
.25O
.250
.250
.000
.250
.250
.250
MNIsMON lC
IbM
CALl
NRAI
UT
IbM
CALl
N~A'i
CAL£
NRAT
ibm
CALl
NRAI
DT
VALUk
4.504
-999.250
-999.250
-999.250
2.560
-999.250
-999.250
-999.250
3.588
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
MNEMUNIC
bL8U
DRHO
NCNb
LLSU
DRHU
NCNb
bb8U
DRHU
NCNb
LL8U
DRHU
NCNL
VALUE
5.199
-999.250
-999.250
3.568
-999.250
-999.250
5.281
-999.250
-999.250
1.294
-999.250
-999.250
.%UFIMAH]( Oi" DATA
1198
966
RECUI~D: 902
FlJ,k '].'HAILFR
FII,E NA~4E: EDIa .001
MAXIMUM PHXSICAL F, ECURD LENGTH:
N~.~XT F ]l,k NAME:
]'APE 'I~AIL, E}~
I,E, NGI'H: 132 D2Tk6
TAPk NA~,E: 00330
SF.:.R V 1 Cfc. NAMk: EDII
~APE CUNI'INUATI£)N
NkXT I'AFE NAMk:
1024 BYTES
DAIE: 80/ 0/12