Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout180-002 ~, t ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMIVlIsSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG FEB 2 8 2005 1 a. Well Status: 0 Oil 0 Gas D Plugged IBI Abandoned D Suspended D WAG 1 b. Well Class: 20AAC 25.105 20AAC 25.110 IBI/:I)evelopment "D'E;~plo~~\,~r:y 1;;':':';:"7'1 No. of Completions Zero Other D'Stråtigräphic Dsêrvicè'" ",." " 5.' Date Comp., Susp., or Aband. 12. Permit to DrillNu'l11ber 12/24/2004 180-002 304-480 6. Date Spudded a. f1'ñ ~ 3. API Number 2/2ØJæ'" /7 () v 50- 029-20431-00-00 7. Date T.D. Reached .fþI:tJ 14. Well Name and Number: 3/412Jd8ff /9&V PBU Y-06 8. KB Elevation (ft): 15. Field 1 Pool(s): 83.3' Prudhoe Bay Field 1 Prudhoe Bay Pool 21. Logs Run: OIL 1 SP / GR, BHCS 1 GR, FDC / CNL / GR / CAL, Cyberlook CASING, LINER AND CEMENTING RECORD SETTING QEPTH MD SETTING ,DEPTHTVD HOLE I OP BOTTOM I OP ~OTrOM SIZE Surface 110' Surface 110' 36" Surface 2689' Surface 2689' 17-1/2" Surface 10467' Surface 8722' 12-1/4" 9962' 11637' 8362' 9616' 8-1/2" D GINJ 0 WINJ D WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1318' SNL, 5055' WEL, SEC. 34, T11N, R13E, UM Top of Productive Horizon: 1738' NSL, 3401' WEL, SEC. 28, T11N, R13E, UM Total Depth: 2217' NSL, 3692' WEL, SEC. 28, T11 N, R13E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 645039 y- 5948942 Zone- ASP4 TPI: x- 641349 y- 5951928 Zone- ASP4 Total Depth: x- 641048 y- 5952402 Zone- ASP4 -.._------------------- .-----------------------. ---------------------- 18. Directional Survey 0 Yes IBI No 22. CASING Size 20" x 30" 13-3/8" 9-5/8" 7" Wr.'PER,FT. Insulated 72# 47# 29# GRADE Conductor L-80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD SCANNED MAR 0 2 2005 26. Date First Production: Not on Production Date of Test Hours Tested 9. Plug Back Depth (MD+TVD) 11593 + 9581 10. Total Depth (MD+ TVD) 11643 + 9621 11. Depth where SSSV set (Nipple) 2065' MD 19. Water depth, if offshore N/A MSL 24. SIZE 4-1/2", 12.6#, L-80 TVD Ft Ft 16. Property Designation: ADL 028287 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) AMOUNT PULLED CEMENTING RECORD 12 cu yds Arcticset Concrete 3854 cu ft Permafrost 1518 cu ft Class 'G', 130 cu ft PF 460 cu ft Class 'G' TUBING'RecORD DEPTH SET (MD) 10019' PACKER SET (MD) 9772' & 9912' 25. ACID, FRACTUAE,CEMENT SQUEEZE, ETC~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10772' Set Whipstock 10772' P&A with 41 Bbls Class 'G' 10772' Set 2nd P&A Plug w/ 21 Bbls Class 'G' ORtG'Nß,L Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE GAs-McF W ATER-BBl PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A PRODUCTION FOR Oil -BBl TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oll-BBl Press. 24-HoUR RATE GAs-McF W ATER-BBl CHOKE SIZE GAS-Oil RATIO Oil GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFL MAR 0 1 2005 G~ ,-- ~ 1'"'" NAME I MD 10625' 10660' 10752' TVD 29. !.. Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". FORMATION TESTS GEOLOGIC MARKERS River 8836' None Sl1ubli~< 8861' Ivishak 8929' 30. List of Attachments: I I of Wark and Daily Drilling Reports 31. i hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Title Technical Assistant Date PBU Y -06 Well Number 180-002 304-480 Permit No.1 Approval No. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Ted Stagg, 564-4694 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. iTEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. iTEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. iTEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records tor this well should show the details of any multiple stage cementing and the location of the cementing tool. iTEM 23: if this well is completed tor separate production from more than one interval (multiple completion), so state in item 1, and in item 23 shollv the producing interJals for oniy the interval reported in item 26. (Submit a separate form tOt' each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). 27: If no cores taken, incJicate "None". ITEM 29: List all test information. It none, state "None". Form .10-407 Revised 12/2003 Submit Original Only Well: Field: API: Permit: Y -06A Prudhoe Bay Unit 50-029-20431-01-00 204-251 Accept: Spud: Release: Rig: 01/02/05 01/18/05 01/25/05 Nordic #2 PRE-RIG WORK 12/13/04 PULL 41/2" MCX ISSSV -1.125" BEAN - SN# M40B. DRIFT WI 3.60" X 20' 10" DUMMY WHIP STOCK 1 STOP @ 3180', PICK UP WT 800 LBS, APPEARS TO BE SCHMOO. RDMO. 12/14/04 T/I/0=650/72010. INJECTING PW ON ARRIVAL. SCMOO-B-GONE TREATMENT (PRE CALIPER) - PUMPED TUBING FROM TREE CAP, 5 BBl MEOH SPEAR, 175 BBLS SBG, 6 BBLS MEOH, SOAKED FOR 3 HRS. PUMPED 120 BBLS 1% KCL OVER FLUSH, 10 BBLS MEOH. PAD OPERATOR TO PUT BACK ON INJECTION AFTER 3 HR SOAK. FINAL WHP'S=0/40010. 12/21/04 DRIFT WI 3.60" X 20' 10" DUMMY WHIP STOCK 1 STOP @ 3324', PICK UP WT 900#, APPEARS TO BE SCHMOO. DRIFT W/3.25 CENT TO 10,400', B&F TUBING W/4.5 BLB & 3.375 G.R. WHILE WELL ON INJ, STANDBY FOR FL TO GET FREEZE PROTECTED. 12/22/04 LRS PUMPED 150 BBLS OF DIESEL/XYLENE, BRUSHED TUBING W/4.5 BLB & 3.625 G.R., LRS DISPLACED DIESEL/XYLENE W/150 BBLS OF DIESEL. DRIFTED W/3.625 BAKER WIS TO 10,850' SLM (900# PU WEIGHT), LOGGED TUBING WIPDS CALIPER. 12/23/04 LOGGED TUBING WIPDS CALIPER (GOOD DATA). SET BAKER WHIPSTOCK AT 10772' IN 7" CASING FACING 3.37 DEGREES RIGHT OF HIGH SIDE LOOKING DOWN HOLE. 12/24/04 KILL WELL WITH 1%KCL AND RIH LOAD BS WITH DIESEL. TAG TOP OF WS AT 10782 CTMD. RESET COUNTER TO ELMD. MIX AND PUMP 41 BBLS 15.8 PPG CEMENT. (5 BBLS NEAT, 30 BBLS WITH 10 PPG AGGREGATE, 5 BBLS NEAT.) JOB IN PROGRESS. 12/25/04 HOLD SQUEEZE PRESSURE OF 800 PSI FOR 1 HOUR. ESTIMATE 10 BBLS CEMENT BEHOND PIPE. RELEASE PRESSURE, DROP BALL AND CONTAMINATE TO WS TRAY. SWIVEL PROBLEMS. CIRCULATE BOTTOMS UP. (THERE MAY BE A SMALL AMOUNT OF FILL ON TOP OF TRAY). REPLACE SWIVEL. POH JETTING ALL JEWELRY AT 80%. FREEZE PROTECT WELL TO 2000 WITH 60/40 MEOH. TRAP 100 PSI ON WELL. JOB COMPLETE. 12/27/04 BAILED FILL OUT OF WELL. RAN DRIFT 3.70 TO 9900 FT SLM. 12/28/04 DRIFT REACHED 9900' SLM AND RIGGED DOWN. RIH TO SET IBP. IBP PARTIALLY SET AT 10185' MID-ELEMENT DEPTH. SLID UP HOLE TO 10152' MID- ELEMENT BEFORE SHEARING OFF. POOH, RDMO. 12/29/04 RECOVERED IBP & SETTING TOOL. RECOVERED 1 RUBBER ELEMENT (POSSIBLE 1 ELEMENT DOWN BY WHIPSTOCK ). Y-06A, Summary of Work Pre CTD Sidetrack Page 2 12/30/04 RECOVERED SMALL PIECE OF IBP ELEMENT (4" X 4"). ATTEMPTED TO SET STANDING VALVE I MIT-IA, COULD NOT DUE TO SCALE BUiLD UP IN COLLARS. RETURN WELL TO PAD OP. 12/31/04 MIRU. MU 2.3" BDJSN AND RIH WHILE KILLING WELL W/1% KCL. UNDERBALANCE WELL WITH CRUDE, RIH AND TAG WS AT 10,782 CTMD AND CORRECT TO 10772'. PUMP 21 BBLS 15.8 PPG CLASS "G" CEMENT WHILE LAYING IN 1 :1. PUH TO SAFETY AND PERFORM HESITATION SQUEEZE. ACHIEVE 1120 PSI WHP. CLEAN OUT TO 10595' USING 98 BBL BIOZAN. CHASE OUT AT 80% JETTING TAILPIPE AND ALL JEWERL Y. BP Operations Summary Report Page 1 .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 Start: Rig Release: Rig Number: 1/2/2005 Spud Date: 1/5/2005 End: 1/15/2005 Date From - To Hours Task Code NPT Phase Description of Operations 12/31/2004 17:00 - 18:00 1.00 MOB P PRE Continue to rig down. 18:00 - 18:40 0.67 MOB P PRE Pre tour safety meeting with the night tour. Discuss plan ahead for the evening. Hold PJSM for moving off well. 18:40 - 20:00 1.33 MOB P PRE Prep to move off well. 20:00 - 20:20 0.33 MOB P PRE Move Nordic 2 of of well L 1-01, and stage in the middle of L 1 pad. 20:20 - 21 :45 1.42 MOB P PRE Prep to lay down derrick and wind walls. 21 :45 - 22:05 0.33 MOB P PRE Safety meeting Re: laying down derrick. 22:05 - 00:00 1.92 MOB P PRE Scope in windwalls. Lay derrick down. 1/1/2005 00:00 - 00:45 0.75 MOB P PRE Continue to lay down derrick. 00:45 - 01:10 0.42 MOB P PRE Hole PJSM with Toolpusher, Wellsite leader, security and rig hands prior to starting move. 01:10 - 06:00 4.83 MOB P PRE Move Nordic 2 from L 1 pad headed toward Y pad on the WOA. 06:00 - 15:00 9.00 MOB P PRE Continue move. Arrive on H-pad at 1500 hrs. 15:00 - 18:00 3.00 MOB P PRE Raise derrick and re-string blocks prior to moving onto Y -pad. 18:00 - 19:00 1.00 MOB P PRE Crew change and PJSM to discuss finish raising the derrick, and restringing drilling line. 19:00 - 22:30 3.50 MOB P PRE Move injector out of the way. Hang blocks. Restring drilling line. 22:30 - 00:00 1 .50 MOB N PRE Ready to move again. Security now escorting Nabors 4ES on a rig move, so are unavailable. Wait on security to arrive. 1/2/2005 00:00 - 00: 15 0.25 MOB P PRE Continue to standby waiting for security. 00: 15 - 00:30 0.25 MOB P PRE Safety meeting with security and rig crew prior to moving from H to Y pads. 00:30 - 02:40 2.17 MOB P PRE Move Nordic 2 from H to Y pad. 02:40 - 15:00 12.33 MOB N WAIT PRE Waiting on Y pad for pad preparation to be completed. Needed 80yds of gravel to level out. 15:00 - 15:20 0.33 MOB P PRE Hold PJSM and review move onto well.! 15:20 - 17:00 1.67 MOB P PRE Set cellar mats. Dig out fill in cellar to access OA valves. 17:00 - 18:00 1.00 MOB P PRE Move over well. rig accepted at 1700 hrs. 1-2-2005 18:00 - 18:30 0.50 RIGU P PRE Crew changeout and Pretour safety meeting with rig hands, valve crew, and cameron hands. Discussed the plan forward for tonight, hazards and mitigation to hazards. 18:30 - 23:15 4.75 RIGU P PRE Check pressure on tree. Found 90 psi. Bleed off pressure to bleed trailor. Got pressure down to 20 psi. Attempt to set TWC. Hanging up in the Swab valve. Steam swab to melt ice. Still can't get TWC thru it. Visual examination shows swab appears to be damaged and sticking into bore 1/4". With shut master valve, ND 7" quick union and swab valve. NU 7" union IN to top of flow cross. 23:15 - 00:00 0.75 RIGU WAIT PRE Valve crew had to run over and pull a TWC at Nabors 9ES. I Stand by on valve crew. IN I 1/3/2005 00:00 - 00: 15 0.25 RIGU ¡WAIT PRE Continue to wait on valve crew to set TWC. Bled tubing I I pressure to 0 psi while we wait. 00:15 - 01 :00 0.75 RIGU !P ! PRE I Valve crew back on location. Set TWC. 01 :00 - 05:00 4.00 RIGU ip PRE . Bleed lAP to 0 psi. Cycle lower lockdown screws. Nipple down ! i production tree. 05:00 - 06:00 1.00 RIGU Ip PRE I Clean furmanite material from void space around upper lock I I down screws. Cycle upper lock down screws. 06:00 - 06: 15 0.25 BOPSU9P PRE I PJSM meeting with oncoming crews. review plan forward. 06:15 - 15:30 : 9.25 BOPSUF1 P ISFAL PRE I NU 13-5/8" BOP's. Notify AOGCC rep of pending test. 15:30 - 16:30 1.00 BOPSURN PRE Make a full body test. Annular not holding, function several I I Printed: 1/31/2005 8:02:45 AM Page 2 8J BP Operations Summary. Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-06 V-06 WORKOVER NORDIC CALISTA NORDIC 2 Date Start: Rig Release: Rig Number: Spud Date: 1/5/2005 End: 1/15/2005 1/2/2005 113/2005 1.00 BOPSUP N From - To Hours Task Code NPT Phase SFAL PRE 15:30 - 16:30 16:30 - 18:00 1.50 BOPSUP N 18:00 - 22:30 4.50 BOPSUR N 22:30 - 00:00 1.50 BOPSUR N 1/4/2005 00:00 - 04:15 4.25 BOPSUP N 04:15 - 09:15 5.00 BoPsur; P 09:15 - 12:15 3.00 EVAL P 12:15 - 13:15 1.00 EVAL P 13:15 - 14:45 1.50 PULL P 14:45 - 15:00 0.25 PULL P 15:00 - 15:50 0.83 PULL P 15:50 - 16:15 0.42 PULL P 16:15 -19:30 3.25 PULL N 19:30 - 20:00 0.50 PULL P 20:00 - 22:30 2.50 PULL P 22:30 - 00:00 1.50 PULL P 1/5/2005 I 1.00 PULL P 100:00 - 01 :00 i 01 :00 - 02:00 1.00 PULL N i 02:00 - 02:20 0.33 PULL P 102:20 - 03:15 0.92 PULL P 103:15 - 04:30 1.25 PULL P I I Ip i 104:30 - 05:30 1.00 PULL I i Description of Operations times. Take accumulator up to 1500psi but conitnues to leak badly. Remove test jt make visual inspection of element. Annular bag is damaged and needs to be replaced. No spare element is available. Arrange to get 13-5/8" annular from Nordic 3. Contact Shane at Nordic 3, arrange trucking. Standing by on new bag. Remove defective 13-5/8" annular while waiting on new bag from Kuparuk. Nipple up new 13-5/8" stack. Continue to NU replacement 13-5/8" annular. Nipple up riser. Check the choke and kill lines. Air up boot on riser. Perform initial BOP test for 13-5/8" BOP's. Test good. Continue testing 250psi low / 350psi high. AOGCC waived witnessing test. DECOMP R/U lines to test IAffbg. PU 24' of 7" lubricator. Pull TWC with DSM lubricator. RD our 7" lubricator. DECOMP Pressure up tubing to 2000 psi. Pressure test IA to 4000 psi. Hold for 1/2 hour and chart. InitiallA pressure = 4000 psi 15 min IA pressure = 3959 psi 30 min IA pressure = 3933 psi Good MIT test. Bleed down IA followed by the tubing, rig down testing equipemnt. DECOMP Back out lockdowns. Rig up 5" DP to pull tubing. DECOMP Safety meeting prior to pulling on tubing. DECOMP Check IA. It has a small amount of pressure. Bleed off to bleed trailer. DECOMP Pick up on tubing string. Unseated tubing hanger at 95 klbs. Pick up in 20 klb increments to 230 klbs. 15' of stretch. Did not release from PBR. Slack off weight and cycle back up to 230 klbs 4 more times. No movement. Unable to pull from PBR. Need to chemical cut. WAIT DECOMP Call for slickline unit for drift and tag. Notify Schlumberger to have chemical cutter BHA ready. DECOMP Hold PJSM with SLB s-line and rig crews. Discuss pressure control equipment rig up. DECOMP Spot SLB slick line unit. RU s-line sheaves & tools. MU 3.75" od drift. Would not pass XO on landing joint. Discuss downsizing chemical cutter with SLB e-liners. MU 3.5" gauge ring. Drift to 9950' SLM. DECOMP Re-spot SLB slick line unit to improve rig up. Discuss downsizing chemical cutter with SLB e-liners. MU 3.5" gauge ring. Drift to 9950' SLM. POOH. DECOMP I Rig down SLB slick line unit & equipment. WAIT DECOMP ¡Wait on SLB e-line crew, delayed by rig move in progress on I Spine Rd. DECaMP I Hold PJSM with SLB & rig crews before beginning rig up. DECOMP Rig up SLB e-line equipment. DECOMP Run in hole with tbg punch & CCL. Log tie in pass. Perf tbg from 9813 to 9815. ¡ I. Well flowing from tbg, u-tubing with IA fluids. I DECOMP POOH with e-line tools. I i SFAL PRE RREP PRE RREP PRE RREP PRE PRE Printed: 1/31/2005 8:02:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BP Operations Summary Report Page 38) V-DB Y-06 WORKOVER NORDIC CAliSTA NORDIC 2 Start: Rig Release: Rig Number: 1/2/2005 Spud Date: 1/5/2005 End: 1/15/2005 Date From - To Hours Task Code NPT Phase Description of Operations 1/5/2005 05:30 - 08:15 2.75 PULL P DECOMP Lay down tubing puncher. All shots fired properly. PU string shot and RIH. Fire string shot 9846'-9859'. Good indication of fire, POOH. 08: 15 - 08:35 0.33 PULL P DECOMP Safety meeting Re: chemical cutter. Discussed hazards and techniques to mitigate hazards. 08:35 - 09:10 0.58 PULL P DECOMP Rig up chemical cutter. Rig floor clear of non essential personnel. 09:10- 12:00 2.83 PULL P DECOMP RIH with 3.375" chemical cutter. Make full tie in pass over jewalry. Position CC head in middle of full joint below SS, at 9858' ELM. Fire chemical cutter. Good indication of fire from wire line unit and on rig floor. POOH with chemical cutter. Ref log for all eline runs was the Camco Jewalry log of 12-09-90. There is 14' difference between ELM and Drillers depths. Chemical cut with ref to drillers depth is 9872'. There should be 17' of stub sticking up from above the PBR, and 14.4' of stub below the SS. 12:00 - 17:00 5.00 PULL P DECOMP Circulate down the IA recovering the diesel freeze protect. Then swap to circulate down the tubing taking returns from the IA. Taking the crude to the tiger tank. Circulate 1150 bbls of hot seawater. Tubing + IA vol = 680 bbls. The last 300 bbls of returns were pretty clean. 17:00 - 18:00 1.00 PULL P DECOMP Pull tubing hanger to the floor. Rig up to recovering control line onto spooler. Begin pulling tubing. 18:00 -18:30 0.50 PULL P DECOMP Hold PJSMfTL mtg with rig crew & service hands. Discuss handling jointed pipe, spill prevention, job assignments. 18:30 - 00:00 5.50 PULL P DECOMP Pull and lay down tubing. Stuff absorb into joint ends to prevent possible spill of well bore fluids. Control lines and stainless cable pulling ok, but plastic coating is shredded and coming off in pieces. Recovered 26 rubber and 6 stainless control line bands/centralizers (none lost in hole). 1/6/2005 00:00 - 02:30 2.50 PULL P DECOMP Run and set Howco 9-5/8" RTTS at 35' below floor. Test same to 1000 psi from top. Release from packer and stand back drill pipe. 02:30 - 02:45 0.25 BOPSUP P DECOMP Hold PJSM with rig crew before begining ND procedure. Discuss rig up for lifting BOPs, and removing tubing spool with loader etc. 02:45 - 06:00 3.25 BOPSUF P DECOMP ND and remove riser. Loosen bolts on tbg spool, upper & lower. 06:00 - 06:50 0.83 BOPSURP DECOMP Crew change and PJSM re: lifting 13-5/8" stack, double securing stack, changing tubing hanger and 9-5/8" packoff. 06:50 - 10:30 3.67 BOPSUR P DECOMP Disconnect hydraulic hoses from stack. Pump into OA to confirm we have good communication to OA. Bleed OA to 0 psi. Pull stack with blocks and secure in cellar with additional I secondary sling. Pull tubing hanger spool. I 10:30 - 14:00 3.50 BOPSU~ P DECOMP i Replace 9-5/8" casing packoffs. 14:00 - 17:30 3.50 BOPSURN WAIT DECOMP i The lower plate for the 9-5/8" packoff can not be removed. ! 1 There are also 10 broken cap screws. To get a new packoff I assembly installed the broken cap screws must be removed, or Iwe must pull the 9-5/S" slips. The Cameron hands suggest spearing the 9-5/8" casing, pulling and changing the slips. This I will require more pull than the Nordic 2 derrick can provide. I I Printed: 1/31/2005 8:02:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 4" BP Operations. Summary Report Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 Start: Rig Release: Rig Number: 1/2/2005 Spud Date: 1/5/2005 End: 1/15/2005 Date From - To Hours Task Code NPT Phase Description of Operations 1/6/2005 14:00 - 17:30 17:30 - 19:00 19:00 - 21 :00 3.50 BOPSUP N 1.50 BOPSUP N 2.00 BOPSUP N 21 :00 - 00:00 3.00 BOPSUP N 1/7/2005 00:00 - 01 :30 1.50 BOPSUF P 01 :30 - 02:30 1.00 BOPSUP P 02:30 - 06:00 3.50 BOPSUF P 06:00 - 06:45 0.75 BOPSUPP 06:45 - 09:45 3.00 BOPSUR P 09:45 - 10:10 0.42 BOPSUP P 10: 10 - 10:25 0.25 BOPSUP P 10:25 - 12:00 1.58 BOPSUP P 12:00 - 13:00 1.00 BOPSUF-P 13:00 - 13:10 0.17 PULL P 13:10 -15:30 2.33 PULL P 15:30 - 15:45 0.25 PULL P 15:45 - 16:30 0.75 PULL P 16:30 - 18:00 18:00 - 21 :00 21 :00 - 23:00 1/8/2005 23:00 - 00:00 00:00 - 03:15 03:15 - 03:45 03:45 - 06:00 06:00 - 08:00 08:00 - 08:40 1.50 PULL 3.00 PULL 2.00 PULL 1.00 PULL 3.25 PULL 0.50 RUNCOJp I I 2.25 RUNCO~ 2.00 RUNCOW I I ! I 0.67 RUNCOIVP I I I WAIT DECOMP Call town and discuss plan forward. WAIT DECOMP After discussion with town the plan is to attempt to fabricate a pulling tool similar to a gear puller, and thread the lower packoff plate and attempt to pull it. Send the Cameron hands to round up the parts to do this. DECOMP Tap 2 holes in each lower c-plate. Rig a simple puller using 3/4" all thread, nuts, and washers. Pull c-plates free from casing head. Dress 3 dutchman protruding from 9-5/8" slip assembly. DECOMP Install new lower 9-5/8" pack-off assembly. Energize same with lock down screws. Install new upper 9-5/8" packoff. NU new tubing head. Activate upper pack off with graphite sealant. DECOMP Continue to NU tbg spool. Inject packoff graphite sealant. Test packoffs & flange to 3500 psi for 15 min. Test good. NU 13-5/8" BOPs to tbg spool. Attach hydraulic lines. NU riser between floor and BOPs. PJSM re: plan forward for today. Finish nippling up riser, set test plug. Body test BOP stack 5 minutes low and high pressure. All passed ok. Pull test plug. Safety meeting re: Pulling RTTS. Pull RTTS and lay down. Rig up hose to top of 4-1/2" completion and circulate to warm well. Pump at 5 bpm. Got more of the rubber coating from the control line out of the hole during this circulation. DECOMP Toolbox talk on tripping tubing OOH. DECOMP Pull old tubing string OOH. Got 40 jts and 1 GLM OOH. DECOMP Hold PJSM re: Crane lifts. Need to pull HES control line spooler off of rig floor. Need to pick up Nabors casing crew , tongs. DECOMP I Make crane lifts. DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP P P Note - If we had a jib crane on the rig floor these lifts could have been made off of the critial path, which would have saved 2 hours of rig time. It also would have been unnecessary to use a rental crane from Peak in Deadhorse. DECOMP Resume pulling old tubing string OOH. DECOMP Continue to POOH with old completion, after rig crew change out. Approx. 180 jts to go. DECOMP I Foot throttle failed on draworks. Call for rig electrician. Repair throttle. DECOMP Continue to pull 4-1/2" completion. DECOMP Continue to POOH with 4-1/2" completion. Chemical cut looks very good. 100% cut. Stub is round. RUNCMP Hold PJSM with SLB slick line crew. Spot unit to allow acess to pipe shed. RUNCMP Run 8.5" gauge ring / junk basket on slickline. RUNCMP Continue RIH. Basket falling slowly. SL operator says it looks as if he is pushing something. Hole deviation is only 45 deg. Basket should fall cleanly. Tag tubing stub at 9856' SLM. (ELM cut depth was 9858') POOH slow. Swabbing on way : OOH, so have to pull slow. RUNCMP i Dump junk basket. Basket is full of what looks like chunks of N I P P RREP Printed: 1/31/2005 8:02:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 5. BP Operations Summary .Report Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 1/8/2005 08:00 - 08:40 From - To Hours Task Code NPT Phase 0.67 RUNCOrvP RUNCMP Date 08:40 - 12:45 12:45 - 13:00 13:00 - 16:45 16:45 - 17:00 17:00 - 17:15 17:15 - 17:35 4.08 RUNCOtvP RUNCMP 0.25 RUNCOtvP RUNCMP 3.75 RUNCOtvP RUNCMP 0.25 RUNCOrvP RUNCMP 0.25 RUNCOtvP RUNCMP 0.33 RUNCOM\J WAIT RUNCMP 17:35 - 00:00 6.42 RUNCOM\J WAIT RUNCMP 1/9/2005 00:00 - 06:00 6.00 RUNCOM\J WAIT RUNCMP 06:00 - 15:00 9.00 RUNCOM\J WAIT RUNCMP 15:00 - 00:00 9.00 RUNCONN WAIT RUNCMP 1/10/2005 00:00 - 03:30 03:30 - 03:45 I I 3.50 RUNCO~ 0.25 RUNCOM\J I i I I I I I WAIT RUNCMP WAIT RUNCMP Start: Rig Release: Rig Number: Spud Date: 1/5/2005 End: 1/15/2005 1/2/2005 Description of Operations control line rubber, parafin, and particulate matter like sand. 90% of debris appeared to be control line rubber. Top half of basket packed full. Got about 1.5 gallons in a 5 gallon bucket of debris on this run. Clean out junk basket, and rig up to rerun. Rerun junk basket gauge ring. Made it to 9944' (?) slickline measured depth on this run. Back at surface. Junk basket full of debris again. Got slightly more debris than last time. Debris consisted of a few big chunks of rubber about 6" long, and lots of fine broken up pieces. Still about 2 gallons in volume. Make 3rd guage ring/junk basket run. Tag up at same depth, 9944' SLM. Hard tag. POOH. We were just notified that the weather conditions are now phase 3. We will continue coming OOH with the junk basket, get to surface, secure the well and dry watch the rig. Continue to POOH. Tag up at surface. Dump junk basket. Got more than last time. About 2+ gallons of debris. A few big pieces of rubber and lots of fine particulate rubber. Leave slickline rigged up. Tie back junk basket. Hold safety meeting Re: phase 3 weather conditions. We have 17 Souls on location. We have the rig crew, 3 slickline hands, 3 service coil hands from a service unit on Y -10. Discuss the BP protocol for phase 3 weather. No work is to be done except what is needed to keep the rig warm and lit. 2 hands must drywatch the rig at all times. All outside travel must be in parties of 2 or greater with at least 1 radio. The other hands are welcome to bunk in the tech limits camp. We have plenty of diesel and rig water. The weather conditions are expected to be phase 3 thru Sunday night. Standby on phase 3 weather. Continue to wait on Phase 3 weather. Fuel and rig water levels ok. Continue to wait on weather. Temp -11, winds 37 gusting 42, windchill -60. Outlook for tonight blizzard conditions, winds to 55 mph. The generator on the Schlumberger slickline unit failed. The crew at location is unable to get it repaired, even with the assistance of the rig motor man. The SLB mechanic in Deadhorse does not want to attempt further field repairs. The slickline unit will not be available to use when the weather moderates. We will have to get another unit to finish our cleanout. Continue to wait on weather. Current winds 36-44 I mph, temp=-16 degf, windchill=-76 degf. I ! Continue to standby waiting on weather. I I I II Continue to standby. Weather conditions Phase 3. Convoy arrived with Nordic crew. Change Nordic crews. Send II SLB service coil and slick line crews off location, to BOC. Rig SLB crews no changeout since Saturday morning. I I Printed: 1/31/2005 8:02:45 AM BP Operations Summary Report Page 6<8' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 Start: Rig Release: Rig Number: 1/2/2005 Spud Date: 1/5/2005 End: 1/15/2005 Date From - To Hours Task Code NPT Phase Description of Operations 1/1 0/2005 03:45 - 06:00 2.25 RUNCOrvN WAIT RUNCMP Continue to wait on Phase 3 weather. Winds at 28 mph, gusting to 40 mph. Temp -22 deg f. 06:00 - 15:15 9.25 RUNCOIVN WAIT RUNCMP Continue to wait on Phase 3 weather. Current winds 24 mph gusting to 30 mph. Temp -22, Wind chill = -75 deg. Forcast is for winter storm warnings until 6 PM today with winds 20-30 mph, temperatures to -30, wind chills in excess of -60 degf. Discussed phase 3 protocol with new Nordic crew. Dry watch the rig. No unneccessary work to per performed. Only do tasks needed to keep the rig warm and the lights on. Rotate the crew members so that they can get sleep, with 1 SLB and 1 Nordic hand on duty at all times. Current head count is 10 souls on the rig. Continue to wait on weather. 15:15 - 15:30 0.25 RUNCOrvN WAIT RUNCMP Convoy to rig with potable water and sewage truck. Extra rig team members head to BOC with return convoy. Continue to wait on weather. 15:30 - 20:00 4.50 RUNCOrvN WAIT RUNCMP Continue to wait on Phase 3 weather. Call AOGCC to discuss BOP test. Extension granted by J. Spaulding to run completion before weekly test. 20:00 - 20:30 0.50 RUNCOrvN WAIT RUNCMP Convoy from Dead horse arrives to change out SLB CTD crew. Continue in Phase 3 weather. 20:30 - 00:00 3.50 RUNCOM\l WAIT RUNCMP Continue to dry watch rig. Still in Phase 3 conditions. Weather slowly improving. 1/11/2005 00:00 - 05:45 5.75 RUNCOrvN WAIT RUNCMP Continue to wait on Phase 3 weather. 05:45 - 06:00 0.25 RUNCOrvN WAIT RUNCMP Discuss weather restrictions with IMT. Phase 2 on main roads, phase 3 on small access roads. Well site leader discretion to assess acessability to location. Hold PJSM with rig team & loader operator. Plan to use 3 vehicle convoy to evaluate access to GC-2. 06:00 - 08:30 2.50 RUNCOIVN WAIT RUNCMP Wait on Phase 3 weather. 08:30 - 09:45 1.25 RUNCOrvN WAIT RUNCMP Convoy out to GC2 to evalute access to V-Pad. Road passable for pick ups only. 09:45 - 10:00 0.25 RUNCOW RUNCMP Hold PJSM with rig crew to discuss loading pipe shed with completion. Heavy equipment widened access path to pad using snow blower. 10:00 - 15:00 5.00 RUNCOt\,p RUNCMP Continue to load pipe shed with 4-1/2" tbg. Arrange for SLB crew change. Call for SLB slick line mechanics & crews to convoy to location to repair slickline unit. 15:00 - 17:00 2.00 RUNCOW RUNCMP RU SLB slick line unit. Run 8.5" drift with junk basket 17:00 - 18:30 1.50 RUNCONf\J DPRB RUNCMP Unable to get slickline through well head. Suspect ice plug. I Run steam hose into well. Put Tioga heater on cellar for ! additional heat. 18:30 - 19:00 0.50 RUNCOryp RUNCMP Crew change on location. Change out and hold on Tour TL and PJSM mtg for night ops. Phz 2/3 19:00 - 22:00 3.00 RUNCOW RUNCMP Pull steam hose from well head. RIH with GRljunk basket. No I obstruction. RIH to 9858' WLM. Recovered 2-1/2 gallons of 112 plastic control line coating and MI mung 22:00 - 00:00 2.00 RUNCO~P RUNCMP Run 8.5" GRlJB again to 9858' WLM 1 112/2005 00:00 - 01 :00 1.00 RUNCOr RUNCMP POOH wI GRlJB and no recovery Printed: 1/31/2005 8:02:45 AM Page 7 CIÞ BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 Date From - To Hours Task Code NPT Phase 1 Ii 2/2005 01 :00 - 02:30 1.50 RUNCOfvP RUNCMP 02:30 - 04:30 2.00 RUNCOM\J WAIT RUNCMP 04:30 - 06:00 1.50 RUNCOfvP RUNCMP 06:00 - 06:45 0.75 RUNCOrvP RUNCMP 06:45 - 07:00 0.25 RUNCOr-,If> RUNCMP 07:00 - 09:00 2.00 RUNCOfvP RUNCMP 09:00 - 09: 15 0.25 RUNCOfvP RUNCMP 09:15 - 10:30 1.25 RUNCOfvP RUNCMP 10:30 - 14:00 3.50 RUNCOIVP RUNCMP 14:00 - 18:00 4.00 RUNCOIVP RUNCMP 18:00-18:15 0.25 RUNCOrvIP RUNCMP 18:15 - 22:20 4.08 RUNCOIVP RUNCMP 22:20 - 23:30 1.17 RUNCOW RUNCMP 1 Ii 3/2005 23:30 - 00:00 00:00 - 00:40 00:40 - 01 :30 SFAL RUNCMP SFAL RUNCMP RUNCMP 0.50 RUNCOM\J 0.67 RUNCOM\J 0.83 RUNCOrvP 01 :30 - 04:15 2.75 RUNCOfvP RUNCMP 04:15 - 06:30 2.25 RUNCOr i I 0.25 RUNCOW 0.50 RUNCOt<IP 0.75 RUNC01\ìP I ! RUNCMP RUNCMP RUNCMP RUNCMP 06:30 - 06:45 06:45 - 07: 15 07:15 - 08:00 08:00 - 08:30 08:30 - 09:30 I 0.50 RUNCOrvP 1.00 RUNCO~ I I RUNCMP RUNCMP Start: Rig Release: Rig Number: Spud Date: 1/5/2005 End: 1/15/2005 1/2/2005 Description of Operations RIH wi 4.5" LIB to 9858' and no marks WO pump bailer Wind is down to 10-15 mph, still Phz 2/3 RIH wi 3" x 10' pump bailer Phz 1/2. Out of hole with bailer. Recovered 1/2 bailer of MI mung and had clear impact marks on bottom of bailer indicating contact with tbg stub (we think). RD SLB slick line. Hold PJSM & TL mtg in dog house with rig crews. Discuss plan forward. Rig up floor to run 4-1/2" TCII completion. Hold PJSM with Nabors, Nordic, SLB, Baker hands to discuss assignments, hazards, procedures for running completion. MU tail pipe over shot, x nipple & packer assembly. Baker lock connections below packer. Torque turn 4-1/2" TCII tubing. First 12-15 jts hanging up in wellhead. Suspect TCII collars hitting some thing. Problem went away as string weight increased. 85 joint in hole at 1400 hrs. Continue to RIH with completion to jt #143 Safety mtg re: TUcrew changelrun tubing Phz 1/2 Torque turn 4-1/2" 12.6# L-80 TC11 R-3 tubing to jt #233 Pickup 2 extra jts and RIH washing thru overshot at 2.0/40 and pressure increased by 200 psi before getting to shear pins (at 2.6' in). SD pump and stack wt on shear pins until sheared at -6k. RIH 6.5' until set down of OS bottoming out. PU 2' and circ 1.5/350 psi, but acts like fill Rig up to reverse and found cellar lines frozen. Thaw Fin thaw cellar lines Close annular and begin rev circ corr inhib SWat 2.75/225 with OS above stub. Wash down to just over top of tubing stub and pressure increased and packed off. Assume more control line rubber (after 50 bbls of returns had recovered one chunk of CL rubber 1.8' long from tubing). Will have to reverse in SW and diesel with OS above stub and hanger below annular before landing hanger LD 3 jts. Add spacer pups. Add a jt. Install hanger. RU landing jt on XO's and circ head. RIH 23' to put hanger below annular and OS about 2' above stub. Close bag Note: ran 232 jts 4-1/2" tubing Reverse in thru kill line wi 400 bbls SW wi corrosion inhibitor at 2.75/230 (pump rate limited by packer specs). After one tubing volume surface lines started packing off with control line rubber and also got MI mung water back Hold PJSM with Little Red. RU pump truck to IA valve in cellar. Pressure test same. Pump 120 bbls warm diesel down IA to freeze protect same. 2.5 bpm @ 300-450 psi. Shut in IA. RD Little Red. Land tubing. Depth díscrepency noted on landing joint. Re-evaluate the numbers. Believe we are landed correctly. IA Printed: 1/31/2005 8:02:45 AM Page 8- BP Operations Sum maryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 Date From - To Hours Task Code NPT Phase 1/13/2005 08:30 - 09:30 1.00 RUNCOtvP RUNCMP 09:30 - 09:45 0.25 RUNCOtvP RUNCMP 09:45 - 10:45 1.00 RUNCOtvP RUNCMP 10:45 - 11 :45 1.00 RUNCOrvP RUNCMP 11 :45 - 14:30 2.75 RUNCOtvP RUNCMP 14:30 - 23:00 8.50 RUNCOrvP RUNCMP 23:00 - 00:00 1.00 RUNCOfv'N DFAL RUNCMP 1/14/2005 00:00 - 00:30 : 00:30 - 04:00 0.50 RUNCOfv'N 3.50 RUNCOfv'N DFAL RUNCMP DFAL RUNCMP 04:00 - 05:45 1.75 RUNCOrvP RUNCMP 05:45 - 06:45 1.00 RUNCOtvP RUNCMP 06:45 - 07:30 0.75 RUNCOrvP RUNCMP 07:30 - 08:15 0.75 RUNCOtvP RUNCMP 08:15 - 11 :00 2.75 RUNCOrvP RUNCMP 11 :00 - 13:00 2.00 RUNCOr-.,p RUNCMP 13:00 - 13:30 0.50 RUNCOrvP RUNCMP 13:30 - 14:00 0.50 WHSUR P RUNCMP 14:00 - 14:15 0.25 WHSUR P RUNCMP 14:15 -15:15 1.00 WHSUR P RUNCMP 15:15 - 22:15 7.00 WHSUR P RUNCMP 22:15 - 22:30 I 0.25 WHSUR P RUNCMP 22:30 - 00:00 1.50 WHSUR P RUNCMP 1/15/2005 00:00 - 00: 15 0.25 WHSUR P RUNCMP 00:15 - 02:30 2.25 WHSUR P RUNCMP 02:30 - 02:50 0.33 WHSUR P RUNCMP 02:50 - 06:00 3.17 WHSUR P RUNCMP Start: Rig Release: Rig Number: 1/2/2005 Spud Date: 1/5/2005 End: 1/15/2005 Description of Operations holding pressure. RILDS. Hold PJSM with SLB slick line & rig crews. Discuss job, hazards, comms, safe area and more. RU SLB slick line unit with 0.125" wire. RIH and recover RHC plug from 9782'. RIH with 3.77" and drift to 10,000' (original tubing tail). POOH RIH and set equalizing plug in X nipple at 9795' WLM. POOH and still had plug. Change shear pin and rerun. Slow runs due to wellbore full of fluid and tight tolerance of plug RU landing jt wi circ head. lAP 250 psi. Bleed off approx 2 bbls diesel to cuttings box until no returns. Leave IA valve open and pressure tubing to set packer. Got to 700 psi wi 1.4 bbls and had a good diesel flow from IA. SO pump and monitor as pressure bled off on tubing-plug is leaking. SI IA valve after tubing pressure was bled off and imbalance continued to flow diesel RD landing jt wi circ head. RU WL RIH wi equalizing prong and knock watermelon off seat RIH wi pulling tool and recover 'X' plug. Packing looked new and no marks on tool. Assume watermelon may have not seated when tool was set RIH wi 'X' RHC plug and set in nipple at 9782' Stand back DP landinglpump in assembly. MU 1 jt TCII. Drop ball & rod assembly. Remove TCII. MU drill pipe landing joint. Open IA. Pressure tbg to 4000 psi to set pkr & test tbg. Record same for 30 min. Test good. Bleed tbg to 1500 psi. Pressure IA to 4000 psi. Record for 30 min. Good test. RIH with slick line to recover ball & rod from RHC plug. POOH. RIH. Recover RHC plug assembly. POOH. Begin cleaning hauling off fluids. Clean pits. RD SLB slickline unit. Set two way check valve in tbg hanger. Hold PJSM to discuss crane picks from rig floor with crew and operator. Use crane to lift Nabors power tongs, thread protector bags, other. Break down landing joint on floor. Round up other misc equipment to ship out. NO 13-5/8" BOPS and load out Safety mtg re: where to set 7" BOP's to be out of the way of 7" tree i Hang 7" BOP's 180 deg out on hook in cellar Fin set 7" BOP's in cellar ¡Install tree adaptor. Test packoff to 5000 psi I Load pits wi 2 ppb biozan ì Safety mtg re: get 7" tree inside cellar wi 7" BOP (tite fit) : Bring tree into cellar and set on adaptor flange studs. Thaw i out tree. NU 7" BOP's on top of swab. Rotate all 180 deg i using blocks to assumed correct orientation to fit S-riser wlo modification. Set tree on adaptor flange ! Note: to fit the prior S-riser, the wing valve must face 90 deg to : the right (parallel to Pad) when looking toward the reserve pit. i This is the first well we have done that is this far off i i Printed: 1/31/2005 8:02:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BP Operations Summary Report Page 9 fit Y-06 Y-06 WORKOVER NORDIC CALISTA NORDIC 2 Start: Rig Release: Rig Number: 1/2/2005 Spud Date: 1/5/2005 End: 1/15/2005 Description of Operations 1/15/2005 06:00 - 15:00 From - To Hours Task Code NPT Phase 9.00 WHSUR P RUNCMP NU BOPS. Tighen flanges. MU hydraulic hoses. Install riser to rig floor. MU kill and choke lines. T est tree to 5000 psi. Date Printed: 1/31/2005 8:02:45 AM BP Operations Summary Report Page 1 . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-06 Y-06 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: Rig Release: Rig Number: 1/15/2005 Spud Date: 1/5/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 1/15/2005 00:00 - 00: 15 0.25 WHSUR P RUNCMP Fin set 7" BOP's in cellar 00:15 - 02:30 2.25 WHSUR P RUNCMP Install tree adaptor. Test packoff to 5000 psi Load pits wi 2 ppb biozan 02:30 - 02:50 0.33 WHSUR P RUNCMP Safety mtg re: get 7" tree inside cellar wi 7" BOP (tite fit) 02:50 - 06:00 3.17 WHSUR P RUNCMP Bring tree into cellar and set on adaptor flange studs. Thaw out tree. NU 7" BOP's on top of swab. Rotate all 180 deg using blocks to assumed correct orientation to fit S-riser wlo modification. Set tree on adaptor flange Note: to fit the prior S-riser, the wing valve must face 90 deg to the right (parallel to Pad) when looking toward the reserve pit. This is the first well we have done that is this far off 06:00 - 15:00 9.00 WHSUR P RUNCMP NU BOPS. Tighen flanges. MU hydraulic hoses. Install riser to rig floor. MU kill and choke lines. 115:00 - 19:45 Test tree to 5000 psi. 4.75 BOPSUPP WEXIT Test BOP equipment. Test witness waived by C. Scheve with AOGCC. 19:45 - 23:00 3.25 BOPSUP N SFAL WEXIT Blindlshear rams leaked. Replace seals and retest (four times) wlo success (slow bleed off by horseshoe seal) 23:00 - 00:00 1.00 BOPSUP P WEXIT RU DSM and pull TWC while wlo SWS to get more seals and new inserts 1/1 6/2005 00:00 - 01 :00 1.00 BOPSUF N SFAL WEXIT Replace blindlshear seals and retest against swab valve, ok 01 :00 - 04:15 3.25 STWHIP P WEXIT Prep injector. Move injector over well and install packoff, gooseneck, etc. Install internal grapple and pull CT from reelhouse thru packoff, -43F ambient 04:15 - 05:20 1.08 STWHIP P WEXIT Fill CT wi FW at 2.25/1050 reversing. Then reverse slack back at 4.513250. Blow CT back wi air 05:20 - 08:00 2.67 STWHIP P WEXIT RU cutter and cut back CT to find slack. Head up e-coil. Test same for pressure, pull, and continuity. 08:00 - 10:00 2.00 STWHIP P WEXIT MU BHA #1 (3.8" parabolic with 2-7/8" extreme mtr). Trouble getting swab valve open. DSO opened bleed port, able to then open swab. 10:00 - 11 :30 1.50 STWHIP N DPRB WEXIT Ice plug at 28' below floor. PU 2 jts PH6 dp and thaw same. 11 :30 - 12:35 1.08 STWHIP P WEXIT Complete BHA. Stab coil. Get on well. 12:35 - 13:30 0.92 STWHIP N SFAL WEXIT RIH with milling assembly. Lubricator o-ring leaking. POOH. Get off well. Unstab coil. Change o-ring (s). Stab coil. Get on well. 13:30 - 15:15 1.75 STWHIP P WEXIT Run in hole with milling assembly. 15:15-20:10 4.92 STWHIP P WEXIT Tag XN at 9984' (9970 ELM). PU and begin time milling @ 0.1' per 5 minutes 2130 psi @ 2.5 bpm. Got thru after 4 stalls 20: 10 - 20:20 0.17 STWHIP P WEXIT Ream and backream wi no motor work - 20:35 0.25 STWHIP P WEXIT ,RIH looking for cement and tagged at 10621' CTD 20:35 - 00:00 3.42 STWHIP P WEXIT Drill cement from 10620' 2.58/2230 at avg 25'/hr 2-3k wob, 150 I psi diff. Dump 20 bbls of crude cut fluid on first BU and i plugged MM wi CL rubber. Penetration rate picked up to 45'/hr I after stall at 10667' 1 1/17/2005 00:00 - 01 :15 1.25 STWHIPiP :WEXIT Continue drilling cement from 10720' 2.55/2230 at avg 55'/hr wi 1 3-4k wob 150 psi diff to stall at 10790' CTD I IWEXIT 01 :15 - 01 :40 0.42 STWHIPi P Wiper back to TOC, 45k. Wiper to EOT 01:40 - 03:15 1.58 STWHIPI P ¡WEXIT POOH for window mill. Overpull at 10620'. Plugged MM with more CL rubber (3 times) 03:15 - 03:50 0.58 STWHIPI P IWEXIT LD 0331 in gauge wi minor chipped diamonds on shoulder. I i I IWEXIT í Add 3.80" window mill and 3.79" SR 03:50 - 05:25 I 1.581 STWH'PI P i RIH wi BHA #2 I ,I I I I Printed: 1/31/2005 8:02:59 AM BP Operations Summary Report Page 2 . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y~06 Y~06 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: Rig Release: Rig Number: 1/15/2005 Spud Date: 1/5/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 1/17/2005 05:25 - 05:40 0.25 STWHIP P WEXIT Precautionary ream/backream XN nipple and no motor work. Plugged MM again wi more rubber 05:40 - 05:50 0.17 STWHIP P WEXIT Resume RIH 05:50 - 06:15 0.42 STWHIP P WEXIT Precautionary ream cement sheath area to pinch point at 1 0807' CTD 06:15 - 09:00 2.75 STWHIP P WEXIT Milling window. TOWhip:10772'. Pinch Point: 10776'. Several stalls getting started. 2420 psi @ 2.68 bpm. WOB: 3.52k#. 09:00 - 15:00 6.00 STWHIP P WEXIT Continue milling window. 2250 psi @ 2.65 bpm fs. 200-600 dpsi. WOB: 6.5k#. PU off btm. 45k#up, 22k#dn wt. Re-zero DH WOB. Tag at 10782'. Resume time milling. 15:00 - 16:15 1.25 STWHIP P WEXIT Continue to time mill. Stall and pick up. Appear to be out of casing. Drill ahead. Line up to swap to flo pro. Top of whipstock: 10,772' Top Window: 10776' Btm Window: 10783' 16:15 - 17:00 0.75 STWHIP P WEXIT Drill ahead to 10793'. Begin displacement to flopro. Ream and back ream window 3 passes. Drift dry. 17:00 - 19:00 2.00 STWHIP P WEXIT POOH for build assembly. Got more rubber back at mud/bio interface 19:00 - 19:40 0.67 STWHIP P WEXIT LD milling BHA. Mill 3.80", SR 3.79" (same as before RIH). Mill had center wear 19:40 - 20:50 1.17 DRILL P PROD1 MU drilling BHA 20:50 - 22:20 1.50 DRILL P PROD1 RIH wi BHA #3 (3.0 geg, HC bi bit) 1.4/2300 thru EDC 22:20 - 00:00 1.67 DRILL P PROD1 Close EDC. Log tie-in down from 10650' to correct to mother WB 0.4/1340/3R. Corr -35' and relog to TO. Tag at 10794' w/o pump. PUH 45k and start pump PVT 386 1/1 8/2005 00:00 - 01 :30 1.50 DRILL P PROD1 Drill build from 10793' 2.57/3200/5Rslowly while working to get orientor to work. Started 0.2 bpm losses at 10815' PVT 378 01 :30 - 02:15 0.75 DRILL P PROD1 Drill ahead 2.7/2.5/3200/30R wi 0.5k wob, 100 psi diff 9.82 ECD at 20-30'/hr PVT 366 02:15 - 02:40 0.42 DRILL P PROD1 Wiper to 10590'. Overpull/MW at 10606'. RBIH, clean 02:40 - 03:45 1.08 DRILL P PROD1 Drill ahead from 10846' 2.7/2.4/3200/35R and losses increased to 1.0 bpm in the next 4'. Slow penetration rate of 23'/hr and frequent stalls ECD 9.7 Max loss rate was 1.3 bpm 03:45 - 05:00 1.25 DRILL P PROD1 Drill ahead from 10875' 2.7/1.6/3000/55R ECD 9.7 and losses are slowly healing due to cuttings. Penetration rate is 30'/hr and increasing wi few stalls PVT 200 - 05:45 0.75 DRILL P PROD1 Drill ahead 2.66/1.52/3000/60R at 55'/hr and have first survey (NBI=78 deg) and on the line. Get into some ratty drilling at 110945' wi several stalls and losing more returns 2.66/1.4/300060R, PVT 143 05:45 - 06:10 0.42 DRILL P PROD1 I Wiper to EOT while wo mud. Clean to window, clean to above I TOC. Wiper to 10500' at 2.5/1.8 PVT 100 06: 10 - 07:30 1.33 DRILL N WAIT PROD1 I Reduce rate while PUH slow and WO mud. 1.6 in/1.4 out 07:30 - 08:30 1.00 DRILL N WAIT PROD1 I Off load 290 bbls flopro. RIH to resume drilling ahead. 08:30 - 11 :30 3.00 DRILL P PROD1 i Continue to drill build section. 3100 psi fs @ 2.6 in/1.8 out. I WOB: 1.4 k#. Rap: 60-80 fpm. Inc/AzJ Tf: 82/354/11 Or. I Whp/Bhp/Ecd: 26/4480/9.7 ppg. IA/OA/Pvt: 4/0/300 bbls Build I complete, all dog leg in turn. Lost all returns at 11027'. ! Continue to drill ahead. KCL and more mud on the way. IA i has gone on a vacuum. TO build and turn at 11150 11 :30 - 13:30 2.00 DRILL P PROD1 I Circulate OOH. Call for Little Red to MIT IA with diesel. I I Printed: 1/31/2005 8:02:59 AM ) ) r ~ \ ~~ FRANK H. MURKOWSKI. GOVERNOR AIIASKA. OIL AlWD GAS CONSERVATION COMMISSION 333 W. 7fH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 t<}ß'1'IJÐf}- Ted Stagg CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Y-06 Sundry Number: 304-480 Dear Stagg: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior ou unless rehearing has been requested. ( DATED this /3day of December, 2004 Enc!. SCANNED DEC 1 4 2004 ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: II Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool , . .PRESENTWELL..CQNQITIQN.SUMMARV Effective Depth MD (ft): Effective Depth TVD (ft): 11593 9581 MD TVD 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 7. KB Elevation (ft): 83.3' 8. Property Designation: ADL 028287 11. Total Depth MD (ft): 11643 Casing Structural Conductor Surfa~ Intermediate Production Liner Total Depth TVD (ft): 9621 Length Size 0 Other 0 Time Extension 4. Current We!'.<1.lass: ~eveloP~~~PloratOry 0 Stratigraphic fir Service 5. Permit To Drill Number 180-002 6. API Number: 50- 029-20431-00-00 9. Well Name and Number: PBU Y-06 Plugs (measured): Junk (measured): None 10905 Burs~ Collapse 5380 ,,~Ckl 2670 46l ' 6870 "ê C ....., V~O "I, a. I () ,-l't 81~ ~ C. <7~f 7Õ-¿{ 41/,~ q"4: (J , '". Tubing Grade: Tubing ~(ft): L-80 10019' Packers and SSSV MD (ft): 9912' 2026' 13. Well Class after proposed work: VJ6/r 0 Exploratory ...ø-r:5évelopment riervice 110' 20" x 30" 110' 2689' 13-3/8" 2689' 10467' 9-5/8" 10467' 1675' 7" 9962' - 11637' 12. Attachments: 1m Description Summary of Proposal 0 Detailed Operations Program 14. Estimated Date for Commencing Operations: 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Ted Stagg Title CT Drilling Engineer Signature "\Z - ~- Phone 564-4694 ~ /' ;f' Commission Use'Only Perforation Depth MD (ft): Perforation Depth TVD (ft): 10622' - 10920' 8835' - 9056' Packers and SSSV Type: 9-5/8" x 4-1/2" GRUIB packer; 4-1/2" Otis SSSV Nipple 0 BOP Sketch December 20,2004 Date: 110' 2689' 8722' 8362' - 9616' Tubing Size: 4-1/2", 12.6# 15. Well Status after proposed work: 0 Oil 0 Gas 0 WAG 0 GINJ 0 Plugged DWINJ 1m Abandoned 0 WDSPL Contact Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628 Da{~Þf I Sundry Number: B () 4 ,- ({ j l) 0 Plug Integrity 0 BOP Test Conditions of approval: Notify Commission so that a representative may witness 0 Location Clearance 0 Mechanical Integrity Test ~t. VL,{'N:'l d ~ í Ýt' ~ t; V\.q¿: ~d il LI ~ 00 A- . L) Other: Ap f~th/~d Ço r WL 10 -40 l Subsequeffi (fa. L 'I . Approved By: Ý . Form 10-403 Revis '-'~3DMS BFL DEC 1 4 7004 COMMISSIONER APPROVED BY THE COMMISSION Date 'suilm1!f DUPLICATE ) ) 0 JJ To: Winton Aubert Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Ted Stagg CTD Engineer Date: Dec. 8, 2004 Re: CTD Tubing Swap and Sidetrack ofPBU Well Y-06 PBU Well Y -06 is scheduled for a tubing swap and a through-tubing sidetrack with Nordic 2 and coiled tubing. Prior to the tubing swap, a mechanical whipstock will be set in the 7" liner and all existing perforations will be squeezed with cement. After testing the cement, Nordic 2 will pull the existing tubing and install new 4 ~" tubing and production packer. The sidetrack, Y -06A, will kick off from the mechanical whipstock and drill a Zone 4 sidetrack to be completed with a fully cemented liner as an injector. The following describes work planned to prepare Y -06 for a tubing swap and sidetrack and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed tubing swap and sidetrack is attached for reference. 1. Confirm integrity of casing and OA. 2. Function lock down screws. 3. Pump a Schmoo-B-Gonejob. 4. Run whipstock drift. 5. Set mechanical whipstock at 10,772' MD. 6. Cement squeeze all perfs using a minimum of 20 bbls cement. Wash out to top whipstock. 7. Pull DGLV from station #1 at 9626'. Circulate well to 8.5 ppg sea water. Freeze protect. 8. Chern. Cut 4 ~" tubing at 9873' . 9. Install BPV. Prep for Nordic 2. Step 6, cement squeezing of all existing perforations, is scheduled for the week of Dec. 20, 2004. Nordic 2 is scheduled to begin the workover approx. Dec. 27, 2004. ~~.. TedS:.:?;7 CfD Drilling Engineer 5'(,'!-ŸI;1r cc: Well File Terrie Hubble ) TREE = Wa.LHEAD = A CTUA ToR = KB. ËLEV = BF. ElEV = KÓP= Max,,~n.~~ = Datum MD = Datum TVD = 6" rvcEVOY rvcEVOY OTIS à"1:26; , 5f76' 34 60' .. . .. ~.n ~-, 46 ~. 6T~g: 10687 8800' SS 13-318" CSG, 72#, L-BO, ID = 12.347" H 2689' Minimum 10 = 3.725" @ 9985' 4-1/2" OTIS XN NIPPLE I TOP OF 7" LNR H 9962' I 4-1/2" TBG. 12.6#, L-80, 0.0152 bpf, ID = 3.958" H 10019' Y-06 41) r-J L I I l 8J J :8: ~! ,~ 9-5/8"CSG,47#.L-80,ID=8.681" H 1046T f---tI PERFORATION SUfvt.J1ARY RS: LOG: SWS - BHCSlGR ON 03104180 ANGLEATTOPÆRF: 44@ 1062Z t-bte: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz ()A.TE 3-318" 6 10622 - 10657' 0 04103189 3-1/8" 6 10760 - 10772' 0 08101180 3-1/8" 6 10782 - 10800' 0 08101180 3-1/8" 6 10820 - 10840' 0 08101180 3-1/8" 4 10850 - 10920' 0 06104185 ! I I I -.. t PBTD H 11593' I ~~ 7"LNR 29#.L-80, 0.0371 bpf,ID=6.184" H 1163T ~... I)ð. TE REV BY COMM:NTS 03112/80 LEM:>1f\E ORIGINAL COM\.ETION 02f27/01 SIS-QAA CON\! ERTID TO c:A N\! AS 03tC3/01 SIS-MO RNAL 06f24/oo Rf'lTP CORRECTIONS OA TE REV BY COMWENTS ') I SAFETY !\OTES 2026' LJ4-112" OTIS SSSV NIP, 10= 3.813" I = ~ 2596' H9-518" OJ A<R 1 ~ GAS LIFT Ml\NJRa.S ST fvÐ TVD OEV TYÆ LATCH VLV 5 2947 2866 1 rvcMY RK 1-1/2" 4 5339 4937 45 rvcMY RK 1-1/2" 3 8045 6856 45 rvcMY RK 1-1/2" 2 9463 7916 42 rvcMY RK 1-1/2" 1 9626 8034 44 rvcMY RK 1-1/2" 9853' IJOTISXASLlOINGSLEEVE 10=3.813" I I 9889' LI GUIB PBR SEAL ASSY I r 9912' W9-518" x 4-1/2" GRUIB PKR. ID = 3.833" I I 9953' IJ4-1 12" OTIS X NIP, 10=3.813" 1 I 9985' H4-112" OTISXN NIP, 10= 3.725"1 I 10019' H4-112" 1BGTAtL, D =3.958" 1 I 10005' H ELfvÐTT LOGGID 12/10/901 .. I 1 0518' 1--1 MA. RKER JOINT 1 I 10905' H PA Rf OF 4-1/2" MI\ GA RANGE A..UG FRLDHOE SA Y UNT Wa.L: Y -06 PERv11T No: 80-0020 A PI No: 50-029-20431-00 Sec. 34, T11N,R13E BP exploration (Alaska) TREE = WB.LHfAO := ACTUA TOR := ""KB. aEV = BF. aEV = KOP= Max Angle = Datum M:> = Datum lVO := 6" t.IC8IOY t.IC8IOY OTIS 81.26' 51.76' 3400' 46 @ 6700' 10687' 8800' SS ) Y-06Ai Proposed CTD Sidetrack ~ ~ ') SAFETY NOTES 2000' IJ X NIFft.E FOR WL REm SSSV 13-318" CSG, 72#, L-80, Ð = 12.347" I-{ 2689' r-J = ----i 2596' H 9-5/8" OV PKR 1 ~ Minimum ID = I TOP OF 7" LNR I-{ r TOP OF 3-3/16" lNR & Toe I-{ l~:~~_~~ Nip 2.75" 10- J 4-1/2" TBG, 12.6#, L-80. 0.0152 bpf, ID = 3.958" - 9962' 9975' 9985' 10019' :& ~ ..... '" g ~ rJ~t~ 9-5/8" CSG, 47#, L-80. D = 8.681" l-i 10467' ~ PERFORA TION SUMv1ARY REF LOG: SWS - BHCSIGR ON 03/04/80 ANGLE AT TOP PERF: 44 @ 10622' Note: Refer to Production DB for historical perf data SIZE SA= MERV AL Opn/Sqz DA TE 3-3/8" 6 10622 - 10657' isolated proposed 3-1/8" 6 10760 - 10772' isolated proposed 3-1/8" 6 10782 - 10800' isolated proposed 3-1/8" 6 10820 - 10840' isolated proposed 3-1/8" 4 10850 - 10920' isolated proposed I FÐTD H 11593' I 7" L~ 29#, L-80, 0.0371 bpf. Ð = 6.184" H 11637' OA TE REV BY COMÆNTS 03112/80 LEMONt ORIGNAL ~ETION 02127101 SIS-OAA CONVERTED TO CANVAS 03103101 SIS-M:> FNAL 06124/00 RN'TP CORRECOONS 11/16104 MSE PROPOSEÐ em SŒTRAO< \ } 13-3/16" L-80 TC-II crTt'ed and perfed l-f 12500' 1 DATE REV BY COMÆNTS ~ 1-19-5/8" x 4-1/2" PKR I 9889' Ij GUIB FÐR SEAL ASSY I I 9912' Ij9-5/8" x 4-1/2" GRUIS PKR, ID = 3.833" 1 I 9953' Ij4-1/2" OTIS X NIP, Ð = 3.813" 1 I 9985' H4-1/2" OTIS XN NIP, Ð nilled to = 3.800" I 10019' H4-1/2" TBG TAL, Ð = 3.958" 1 I 10005' 1-1 ELMO TT lOGGED 12/10/901 I 10518' I-{MARKERJOINT I c::::::J '"----I 10772' 1-; Mechanical Whipstock I 10905' I-{PARTOF4-1/2" MAGARANGEPLUG 1 PRUDHOE BA Y UNIT WELL: Y -06A PffiMIT No: API No: 50-029-20431-01 Sec.34.T11N,R13E BP exploration (Alaska) MEMO RAND UM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor ~1'n C¡/Zòjo4 DATE: Wednesday, September 15,2004 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC Y-06 PRUDHOE BAY UNIT Y-O6 FROM: Lou Grimaldi Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv ~ Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT Y-06 API Well Number: 50-029-20431-00-00 Inspector Name: Lou Grimaldi Insp Num: mitLGO409I4154919 Permit Number: 180-002-0 Inspection Date: 9/1412004 Rei Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well Y-O6 Type Inj. G TVD 8325 IA 1020 2500 2490 2490 P.T. 1800020 TypeTest SPT Test psi 2081.25 OA 10 20 15 15 Interval 4YRTST P/F P Tubing 570 570 570 570 Notes: Wednesday, September 15, 2004 Page lofl ~t::; I -VO ~r 11.1 It I OVVV...V) VV /"\.\.J 1I1Jt::~lUl WIUI ;:)lUW I XI/"\. \..-UllllllWl... ~ ~ Thanks for the notification; please add this to your monthly waiver list for injectors (if not already done). Jim Regg AOGCC NSU, ADW Well Integrity Engineer wrote: Hi Jim and Winton, Y-06 (PTD #1800020) is exhibiting slow TxIA communication. Wellhead pressures are under trigger pressure at 2456/1880/120 and therefore the well is not considered a problem well at this time. Our plan forward: 1. Operations: Swap well to water injection as soon as possible 2. DHD: Conduct MITIA - Send results to AOGCC 3. WIE: Eval MITIA results Please let me know if you have any questions. Anna Dube Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 xl154 1 of 1 4/23/20044:16 PM Unocal Corporation ( Od & Gas Operabons 909 West 9th Avenue, P O Box 196247 Anchorage, Alaska 99519-6247 Telephone (907) 276-7600 UNOCALd March 20, 1996 Alaska Mr David Johnston, Commissioner Alaska Oil & Gas Conservation Comm. 3001 Porcupine Drive Anchorage, Ak. 99501-3192 Dear Commissioner Johnston. Re: Dolly Varden Platform - Well D-12RD /~PI Number 50-733-20142-01 The following intervals were perforated in Well D-12RD: HB-0 11,150 11,160 10 6/25/94 HB-0 11,190 11,200 10 6~25~94 HB-1 11,230 11,240 10 6~24~94 HB-3 11,412 11,432 20 6~24~94 HB-4 11,485 11,515 30 6~24~94 TOTAL 80 Very truly yours, G. Russell Schmidt Drilling Manager STATE OF ALASKA (' ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operations performed. 2 Name of Operator Operation shutdown....- Stimulate -.-. Plug ig_~ -.- Pull tul~ng After casln~l Repair well UNION OIL COMPANY OF CALIFORNIA (UNOCAL) 3 Address P.O BOX 196247 ANCHORAGE~ AK 99519 - 6247 4 Location of well at surface 678' FSL, 1,217' FWL, Sec 6, T8N, R13W, SM At top of productive ,nterval 1,251' FWL, 2,526' FNL, Sec 8, T8N, R13W, SM At effective depth 1,131' FWL, 2,418' FNL, Sec 8, T8N, R13W, SM At total depth 1~165' FWL, 2,620' FNL Sec 8~ T8N~ R13W, SM 12 Present well condition summary Total depth measured 12,050 true ver'acal 10,188 J5 Type of Well Development Exploratory Stratigraphic Sennce ORIGINAL Perforate X Pull tul~n~l Other 6. Datum elevabon (DF or KB) 106 KB above MSL 7 Unit or Property name Trading Bay UnR 8. Well number D-12RD feet 9. Permit number 80-02/94-117 10. APl number 50-733-20142-01 11 Field/Pool Hemlock feet Plugs (measured) 11,904' - 12,050' CMT feet Effective depth: measured 11,894 true veFacal 10,038 feet Junk (measured) 11,894' - 11,904' Pkr feet Casing Length Size Cemented Measured depth True ve~cal depth Structural Conductor Surface Intermediate 9,365' 9-518" 2,326 sx 9,365' 7,727' Producbon 2,894' bner PerforatJon depth measured true verbcal Tubing (s~ze, grade, and measured depth) Packers and SSSV (type and measured depth) 7" 850 sx 12,031' 10,168' See Attachment #1 ECEIVI 3-1/Z', 9 2#, N-80 Tbg to 11,070' Jl~aska Oil & Gas Cons. C0~ Anchorage 3-1/2" Otis DC TRBV SCSSV @ 310'; Ohs WD Pkr @ 11,014' 13 Stlmulabon or cement squeeze summary Intervals treated (measured) 14 Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data O~l-Bbl Gas-Mcr Water-Bbl Casing Data Tubing Pressure Prior to well operation 292 16 471 1160 140 Subsequent to operabon 489 y 350 776 1150 135 15 Attachments 16 Status of well classification as' __ Copies of Logs and Surveys run Daily Report of Well Operabons Oil X Gas Suspended Service 17 I hereby certify that the fo{~o/,r~g is tr~e~a)n~.,~est of my knowledge Signed G Russell Schmidt~t~-~~~~~e DrllhngManager Date Form 10-404 Rev 06/15/88 1" - SUBMIT IN DUPLICATE D nission ATTACHMENT #1 WELL D-12RD BENCH MD TVD 0 11,190 11,200 9,379 9,388 1 11,225 11,240 9,415 9,429 2 11,250 11,268 9,434 9,451 3 11,350 11,360 9,526 9,536 ,, 3 11,412 11,432 9,588 9,607 4 11,440 11,470 9,610 9,637 4 11,485 11,495 9,656 9,661 4 11,496 11,520 9,662 9,688 4 11,530 11,580 9,693 9,744 5 11,596 11,630 9,759 9,790 5 11,690 11,715 9,843 9,867 ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 26 April 1994 RE: Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION ECC No. 1 PDK/GR/CCL FINAL BL -~ PDK/GR/CCL RF SEPIA Run ~ i 5842.04 Run ~ i ~ -~ P-02 . 1PLS LEAKDET.FINAL BL Run # I 6021.04 ~PLS LEAKDET.RF SEPIA Run # 1 1PLS STATI/~ FINAL BL ~1PLS SX4TTIC RF SEPIA ~3~5~ D-O7A 1 SPNR/TEMP FINAL BL ,-~ SPNR/TEMP RF SEPIA PLS INJPROF.FINAL BL PLS INJPROF RF SEPIA ~0--0~- Y-06 (23-28-11-13) 1 PLS STATI~ FINAL BL /1 PLS STKTIC RF SEPIA Run # 1 6149.01 Run # 1 Run # 1 6021.05 Run # I Run ~ 1 6180.00 Run ~ I Run # 1 5751.03 Run # 1 Received by: Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Date: Received by: Please sign and return to: Sonya Wallace (MB 3-3) Petrotechnical Data Center BP Exploration (Alaska) Inc. 900 East Benson Boulevard Anchorage, Alaska 99508 ~/aska Oil ~ Coo& .Orage C°rnrni,~ion Date = STATE OF ALASKA COMMI~ -)N REPORT OF SUNDRY WELL OPERATIONS 1. Operations pedormed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1318' SNL, 225' EWL, SEC. 34, T11N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 2075°NSL, 1663'EWL, SEC. 28, T11N, R13E, UPM At total depth 2218'NSL, 1581'EWL, SEC. 28, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11643feet true vertical BKB 9621feet 5. Type of Well: Dov~lopmenl~ Exploratory Stratlgraph~c ser~c~'A" Plugs (measured) 6. Datum elevation (DF or KB) KBE = 81.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-06 (23-28-11-13) PBU 9. Permit number/approval number 80-2/ 10. APl number 50- 029-20431 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 11370feet true vertical BKB 9403feet Junk (measured) fill at 11370' MD (07/85) Casing Length Structural -- Conductor 110 Surface 2660 Intermediate 10438 Production -- Liner 1675 Perforation depth: measured Size Cemented 20x30 12c. y. 13 3/8 3854 c.f. 9 5/8 1648 c.f. 7 10622'-10657' (Sag R) true vertical Tubing (size, grade, and measured depth) Measured depth 139 2689 10467 460 c.f. 9962-11637 10760'-10772', 10782'-10800', 10820'-10840', 10850'-10920' (Ivishak) subsea 8752'-8778' (Sag R) 8854'-89 74' (four Ivishak intervals) 4 1/2"L-80 to 9912' with 4 1/2"tailpipe to 10019' True vertical depth BKB 139 2689 8722 8362-9616 Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Anchorage 14. Representative Daily Average Production or Injection Dar~, OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service t4/ater injection well 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~~~.~L {/~_ ~,~ Title SeniorTechnicaiAssistantl Form 10-40z~ Rev 06/15/88' / ' Date d~°,x~.~,/~ SUBMIT IN DOPLIC'ATE WELL Y-06 (23-28-11-13} Variance Due to further inspection. The Variance for a down hole leak Proposal for the above well was not performed. 7/27/92 RECEIVED AUG - 5 ~B92 Anchora.q~ ( BP EXPLORATION BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :04/17/91 T#:82316 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. E-02 H-17 Y-06 ~q.q~ .-Z-18 GL 03/06/91 #1 9700-9950 HLS 5" Peal 02/16/91 #1 10200-10620 HLS 5" CL 02/26/91 #1 9800-10030 HLS 5" Ped 02/13/91 #1 13590-13781 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED APR ?_ 5 19 1 Alaska Oil & Gas Cons. (.;ommission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :12/26/90 T#:81955 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINAL,~ Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. S-25 Prod-F 12/05/90 # 1 9150-9564 Camco 5" Y-11 Jewelry Log 12/09/90 #1 8800-9800 Camco 5" Y-06 Jewelry Log 12/09/90 #1 9800-10600 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED JAN 5 1991 Alaska 011 & Gas Cons. Commission ~chorage To AOGCC Commissioners From R. C. Bachman .,~<C,~,_ Production Engineering Supervisor Subject Variance for Y-06i to Continue Injection Injection well Y-06i has developed communication from tubing to inner annulus. The well annulus will pass a Mechanical Integrity Test but over a period of 12 hours will build to injection pressure (still within safe operating limits). The wellhead has been tested and verified that the leak is downhole. Spinner and temperature logs have been run on Dec 9 in an attempt to locate the leak but it is too small. We will likely be plugging the well and running a noise Icg in the near future to locate and repair if possible. We are requesting a variance to continue injection until the leak is found and repaired. Daily close monitoring of the well's conditions will continue. CC: Y-06i GL PE RECEIVED DEC 1 4 1990 Alaska 0il & (las Cons. Commission Anchorage , ( STATE OF ALASKA O(h ALASKA OIL AND GAS CONSERVATION COMMISSI APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend Alter caang Repar well~ Change approved program ~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1318' SNL, 225' EWL, SEC. 34, T11N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 2075' NSL, 1663' EWL, SEC. 28, T11N, R13E, UPM At total depth 2218'NSL, 1581'EWL, SEC. 28, T11N, R13E, UPM Opera'aon Shutdown __ Plugging __ Pull tubing __ Vanance X 5. Type of Well: Development X Explorato~/ Stral]graph~c Set. ce Re-enter suspended well __ Time extension Stimulate Perforate Othe~ 6. Datum elevation (DF or KB) KBE= 81.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-06 (23-28-11-13) PBU 9. Permit number 80-2 10. APl number 50- 029-20431 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 11643 feet Plugs (measured) true vertical BKB 9621 feet Effective depth: measured 11370 feet Junk (measured) fillat 11370'MD (07/85) true vertical BKB 9403 feet Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 x 30 12 c.y. 139 Surface 2660 13 3/8 3854 c.f. 2689 Intermediate 10438 9 5/8 1648 c.f. 10467 Production -- Liner 1675 7 460 c.f. 9962-11637 Perforation depth: measured 10622'-10657' (Sag R) 10760'-10772', 10782'-10800', 10820'-10840', 10850'-10920' (Ivishak) true vertical subsea 8752'-8778' (Sag R) 8854'-8974' (four Ivishak intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9912' with 4 1/2" tailpipe to 10019' Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026' True vertical depth BKB 139 2689 8722 8362-9616 RECEIVED DEC 1 4 1990 Alaska 0il & Gas Cons. C0m~t~ Anchorage 13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch 14. Estimated date for commencing operation DECEMBER 1990 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas __ Suspended __ Service water iniection well 17. I hereby ce_~ify that th.e,,foregpirrg is true and correct to the best of my knowledge. Signed ~/C~'~~ Titlo PRODUCTIONENGINEERINGSUPERVISOR Date 8 DEC 90 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance __ Su~seouent Mechanical Integrity Test for, m,,rectuJred 10- /--~/--~ -- Ap~3rovea ~,utsy Re, turne(~ Approved by order of the Commission I o~.~-'__ '/~r"l0 Form 10-403 Rev 06/15/88 I Approval Not,z) Commissioner Date ORIGINAL SIGNED LONNIE C. SUBMIT IN TRIPLICATE BP EXPLORATION April 24, 1989 BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well Y-6 (23-28-11-13) PBU Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, Waterflood & Miscible Flood BJP:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File RECEIV£D STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Plugging Repair well 5. Type of Well: Exploratory StratJgraphic 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1318' SNI., 225' EWL, SEC. 34, T11N, R13E, UPM At top of productive interval N/A - water Injection well At effective depth 2075' NSL, 1663' EWL, SEC. 28, T11N, R13E, UPM At total depth 2218' NSL, 1581' EWL, SEC. 28, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB Stimulate Alter casing Perforate X Other 6. Datum elevation (DF or KB) KBE . 81.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-06 (23-28-11-13) PBU 9. Permit number/approval number 80-2 / 9-189 10. APl number 50- 029-20431 11. Field/Pool Prudhoe Oil Pool 11643feet Plugs (measured) 9621 feet 11370 feet 9403feet Junk (measured) fill at 11370'MD (07/85) Casing Length Structural -- Conductor 110 Surface 2660 Intermediate 10438 Production -- Liner 1675 Perforation depth: Tubing (size, grade, and measured depth) Size Cemented Measured depth 20 x 30 12 c.y. 139 13 3/8 3854 c. fo 2689 9 5/8 1648 c.f. 10467 7 460 c.f. 9962-I 1637 measured 10622'-10657' (Sag R) 10760'-10772°, 10782'-10800', 10820'-10840', 10850'-10920' (Ivishak) true vertical subsea 8752'-8778' (Sag R) 8654'-8974' (four Ivishak intervals) 4 1/2" L-80 to 9912' with 4 1/2" tallpipe to 10019' True vertical depth BKB 139 2689 8722 8362-9616 Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure g 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026' APR 2 · as/a Oil & Gas Cons, C~m/ss~0n 14. Prior to well operation Subsequent to operation Reoresentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 9350 9800 Tubing Pressure 1350 1250 16. StatusofwellclassEication as: Oil Gas Suspended 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 17. I hereby certify that the for~i~(~g i,~rue and correct to the best of my knowledge. Si~ned ~~'-~~_ Title Supervisor Waterflood/Miscible Flood Form 10-404 Rev 06/15/88 ~ Service water in. iection well SUBMIT IN DI. JPLIdATE ¢ W]~LL Y-fi6 (23-28-11-13~ PBU AI)D'L. PERFORATION OPERATIONS The following Sag R. interval was perforated April 3, 1989 using Schlumberger 3 3/8" carrier guns at 6 spf: 10622' - 10657' MD BKB (Ref. BHCS, 3/4/80) A lubricator was installed and tested to 3500 psi for all well work. Thc well was returned to injection immediately following perforating operations. jm 4/19/89 BP EXPLORATION HOUSTON ARCO CHEVRON E~XON TEXACO 70: MOBIL PHILLIPS STATE OFALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES BP CASED HOLE FINAL LOGS BP Explorat,on (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Da*e: 04-10-89 T~: 79947 The following material Is being subml'l-i'ed herewith. Please acknowledge receipt by signing a copy of this letter and re?urnlng It ?o ?his office: Y-06i PERF 04-03-89 #1 10435-10700 Sch 5°. Received Date Shirley R. McCurry INFORMATION CONTROL Well Records LR2-1 BP EXPLORATION March 9, 1989 BP Exploration (Alaska) Inc 900 East Benson Boulevard PO Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Y-6 (23-28-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, Supervisor Waterflood & Miscible Flood BJP:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File BP EX~I.O~ON HOUSTON ARCO CHEVRON EIXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCF-S RESERVOIR REFERENCE: ARCHIVES · " BP'CASED HOLE FINAL LOGS BP Exploration (Alaska) Int. 900 East Benson Boulevard I~[ Box 196612 Anchorage, Alaska 99519-6612 (9O7) 561-5~11 Da't'e: 03-13-89 TI: 79875 The following ma*erial Is being submitted herewl*h. Please acknowledge recelp* by slgnlng a copy of this lef~rer and re*urning I? ~o ?hls office: C-29 PITS 02-18-89 #1 11400-11880 Camco 5" C-30 PROD-F 02-22-89 #1 9300-9620 Camco 5" C-31 PITS 02-20-89 #1 11400-11635 Camco 5" F-15 PITS 02-17-89 #1 9100-9650 Camco 5" F-18 INJ 02-23-89 #1 11850-12350 Camco 5" H-29 GLS 02-19-89 #1 SURFACE-8700 - Camco 5" M-06 PROD-F 02-18-89 #1 11000-11650 Camco 5" S-09 INJ 02-19-89 #1 9850-10245 Camco 5" W-27 PROD-F 02-16-89 #1 11250-11450 Camco 5" W-29 PROD-F 02-15-89 #1 10500-10850 Camco 5" Y-06 INJ 02-17-89 #1 10600-11350 Camco 5" Y-08 GLS 02-16-89 , #1 3100-88z~7 Camco '5" Received Da*e Also ..... Shirley R. McCurry I NFORHAT i ON CONTROL We i I Records LR2- I STATE OF ALASKA SKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Alter casing ~ Repair well Change approved program 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1318' SNL, 225' EWl., SEC. 34, T11N, R13E, UPM At top of productive interval N/A - water injection well At effective depth 2075' NSL, 1663' EWL, SEC. 28, T11N, R13E, UPM At total depth 2218' NSL, 1581' EWL, SEC. 28, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Operalion Shutdown ~ Plugging Pull tubing ~ Vmience ~ 5. Type of Well: Development x Exploratory S~'atlgraphic Re-enter suspended well~ Time extension Slimulate Perforate X Olher 6. Datum elevation (DF or KB) KBE - 81.26 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-06 (23-28-11-13) PBU 9. Permit number 80-2 10. APl number 50- O29-2O431 11. Field/Pool Prudhoe Oil Pool 11643 feet Plugs (measured) 9621 feet Effective depth: measured 11370 feet true vertical BKB 9403 feet Junk (measured) fill at 11370' MD (07/85) Casing Length Structural .. Conductor 110 Surface 2660 Intermediate 10438 Production -- Liner 1675 Perforation depth: measured Size Cemented Measured depth 139 2689 10467 20x30 12c. y. 13 3/8 3854 c.f. 95/8 1648c. f. 7 460 c.f. 9962-11637 10760'- 10772', 10782'-10800', 10820'-10840', 10850'-10920' True vertical depth BKB 139 2689 8722 8362-9616 true vertical subsea 8854'-8974' (four intervals) Tubing (size, grade, and measured depth) 4 1/2"L-80 to 9912' with 4 1/2"tailpipe to 10019' Packers and SSSV (type and measured depth) 9 5/8" Guiberson packer at 9912'; 4 1/2" BVN at 2026~ ' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation I 15. Status of well classification as: February 1989 16. If proposal was verbally approved Oil X Gas Name of approver Date approved Service 17. I hereby certify that the foregoing js true and correct to the best of my knowledge. _7 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY I EINklIF P. RMITI-I Commissioner Approved Copy Returned SUBMIT IN TRIPLICATE WKLL Y.06 ¢23.2g-11-13~ PBU ADD'L. PERFORATION PROPOSAL We propose to perforate the following Sag River interval during February 1989: 10622' - 10657' MD BKB (Ref. BHCS, 3/4/80) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to injection immediately following perforating operations, then tested. jm 2/10/89 FLOW TUBES & PACKOFF BOWEN PACKOFF J-.-- HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE FLOWLINE ~J VALVE GREASE LINE GREASE ~/~ '" MANIFOLD .~. GREASE ' PUMP · RISER ..-GREASE RESERVOIR BOP C. V~ C~hatterton Chai,~.,' n Lonnie C. Smith Commis s ioner Bobby D. Foster Petroleum Inspector CONSERVATION COMMISS ION December 16, 1986 D. BDF. 89 Mech Integrity Test SAPC PBU Pads S, M, U, R, N, T, Y, H, F, X Prudhoe Oil Pool ~ednesday, November 19~ 1986: The tests began at 7:00 a.m. and were concluded for the day at 4:30 p.m. with 10 wells being tested. Thursday~ November 20~ 1986: The tests began at 7:00 a.m. and were concluded for the day at 7:00 p.m. with 14 wells being tested. Friday~ November 21~ 1986: The tests began at 6:30 a.m. and were concluded for the day at 4:30 p.m. with 10'wells being tested. Saturday~ November 22~..1986: The tests began at 6:30 a.m. and were concluded at 1:00 p.m.; and were resumed at 6:00 p.m. and concluded for the day at 9:00 p.m. ~£ O~'~.. As the attached mechanical integrity~ ~Io~stest ~ports show were tested, all of which met the/~AOGCC regulations. In summary, I witnessed the mechanical integrity tests on Standard Alaska Production Company's injections wells listed on the attached test forms. Attachments 0 AI~SKA OIL AND ~ OONSERVATION CEI'EMTSSION MECHANICAL INTEGRITY TEST PR~I'~T START 15 bgNi 3O MIN *P *I TYPE OF PKR CASING TBG REQ TBG TIME TI1 WELL *S --- ANNULUS TVD SIZE/WT/GRADE SIZE TEST CSG TBG TBG %~G CfPIqENTS *M *lq FLUID MD PRESS PRESS CSG CSG CSG PRESS PRESS PRESS SALT WATER INJ GLYCOL MISCI]%~ ~ INJECTION SALT WATER IN3ECTIN~ DRrr LING b~JD .,, N m NOT ~ OTHER D.EteS.06 A 20 AAC 25.030(a) 20 AAC 25.412(c) 20 AAC 25.252(d) SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRO'; E~XON TO D.~L/UNIT/STATE: TEXACO (-Marathon) blOBIL PHILLIPS STATE OF AK 3111 C'STREET ANCHORAGE ALASKA TELEPHONE 1907l 265 0000 IVIAIL POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 03/13/86 76933 BPAE GEOSCIENCES RE~'ERENCE SOHIO CASED HOLE FINAL LOGS The following material is being submitted herew,th. Please acknowledge rece,ot by signing a cody of this letter and returning It to this off,ce:-- DAL/UNIT/STATE: ~A-26 "-. D-26 ~N-2 ~X-9 "-Y-6 ~Y-iO DFT 02/21/86 #1 10400-11020 GO 5" GR 02/11/86 #3 9700-10900 GO 5" Gas Lift Temp. Survey 03/08/86 #1 3050-8750 Camco 5" Temperature(Pump-in) 03/5-6/86 #2 12000-12500 Camco 5" injection Profile-SPINNER 02/15/86 #1 10600-11332 Camco 5" Temperature(Pump-in) 02/-1/86 #1 9150-10153 GO 5" R£CE~vFD INDEXED -- SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON EXXON 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE 19071 265-0000 MAIL POUCH 6-612 ANCHORAGE. ALASKA 99502 TO DAL/UNIT/STATE: TEXACO (-Marathon) MOBIL Date: 03/13/86 PHILLIPS T~: STATE 76934 BPAE (Transmittal Only) -- REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- /' A-II B-13 C-12 C-12 D-13 K-4 G-3 H-9 J-9 N-19 U-8 X-10 ¥-5 ¥-6 Y-18 Step Rate 02/12/86 Camco Step Rate 02/13/86 Camco Static Gradient 02/11/86 Camco Static Gradient 02/29/86 Camco BHPD 01/30/86 Camco Static Gradient 01/30/86 Camco Static Gradient 02/25/86 Camco Static Gradient 02/09/86 Camco Step Rate 02/14/86 Camco Static Gradient 02/09/86 Camco Flowing Gradient 02/09/86 Camco Static Gradient 02/22/86 Camco Static Gradient 02/19/86 Camco Step Rate 02/18/86 Camco Static Rate 02/15/86 Camco Step Rate 02/21/86 Camco RECEIVED DATE -' ~ ~ idge LR2-1 - - drVic: ;~2~-c2 ;3, z~;'2.": . I~FORMATION CONTROL ...... ~/// ;~z~-~ C, L i~: i~ ~-,~ 2~ ~ell Records LR2-1 SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P O BOX 6612 ANCHORAGE, ALASKA 99502~612 September 1 8, 1 985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 · Attention: I.Ir; C.V. Chatterton Well A-3, A-8, A-27, B-13, H-9, Y-6, Y-11, and Y-18 PBU Gent] emen: Enclosed in duplicate, is Forum 10-403, Sundry Notices and Reports on Wells for the above named wells. These contain our subsequent reports of having converted them from oil wells into water injection wells. Yours very truly, k '6 SOHIO ALASKA PETROLEUM COMPANY M. D. Martin Senior Petroleum Engineer RECEIVED Enclosures cc: T. N. Tyler, (MBg-2) Well Records, (LR2-1) Drilling Well File #17 OCT 0 7 1985 Alaska Oil & Gas Cons. Commission Anchorage {' STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL OTHER [] 2 Name of Operator 7 Permit No SOHIO Alaska Petroleum Company 80-2 3 Address 8 APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o-029-20431 4 Location of Well At Surface' 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPH 5 Elevation ~n feet (,ndmate KB, DF, etc ) KBE : 81.26' AMSL 12 Lease Designation and Serml No ADL 28287 9 Umt or Lease Name Prudhoe Bay Unit 10 Well Number Y-6 (23-28-11-13)PBU 11 Field and Pool Prudhoe Bay Prudhoe Oi 1 Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit m Tnphcate) (Submit m Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) This well was converted from a Prudhoe Bay production well into a water injection well for Western Peripheral Wedge Zone (W. P.W.Z. ) on September 8, 1985. Water was injected through the following perforations at 4 s.p.f. 10760' -- 10772' BKB 10782' -- 10800' BKB 10820' -- 10840' BKB 10850' -- 10920' BKB RECEIVED OCT 0 ? Alaska Oil & Gas Cons. Commission Anchorage ~ereby certify that the foregol_ng i~o the best of my knowledge S~n7 .d~;;;~.~.~~"~~--~"~ Title Senior Petroleum Engineer , Date Tl~e space below for Commission use Conditions of Approval, if any By Order of Approved by COMMISSIONER the Commission Date__ Form 10-403 Rev 7-1-80 Submit "Intentions" m Triplicate and "Subsequent Reports" m Duplmate INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907! 265-0000 MAIL POUCH 6-612 ANCHORAGE. ALASKA 99 502 Date: 09/16/85 T#: 7 6433 REFERENCE- SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- ~'-A-1 '--- Static 08/21/85 Camco . A- 5~' Static 09/02/85 Camco -8 f Static 07/09/85 Camco ~A-11- Static 09/05/85 Camco Pres.Drawdown 08/07/85 Camco Pres.Drawdown 07/12/85 Camco ~"'B- 6 ' Static 09/09/85 Camco ~'"C-16- BHPD & PBU 09/01/85 Camco ~-17- Static 08/26/85 Camco ~'E-17 Static 08/28/85 Camco ~-F-9'- PBU &-BHPD 08/12/85 GO ~-9 ~' PBU 07/11/85 Camco -'"~ZR-6--~ PBU & BHPD 08/15/85 GO ~R-9-'~ Flowing Gradient 08/20/85 Camco '~'R-2~ Step Rate Test 05/29/85 Sch '~'R-24 / Data Frac 05/29/85 Sch '~'U-4 - Static 09/05/85 Camco ~U-5j Static 09/05/85 Camco -8~' Static 08/17/85 GO -9j Static 08/30/85 Camco  -5' Static 09/04/85 Camco -6-- Flowing Gradient 08/27/85 Camco ~Y-8" Static 09/07/85 Camco ~Y-11/Flowing Gradient &~HPD 08/26/85 Camco RECEIVED DATE Victoria Aldridge LR2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P O BOX 6612 ANCHORAGE, ALASKA 99502-0612 August 21, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr. C.V. Chatterton Wells A-3, A-8, A-16, A-27, B-13, H-9, U-3, U-9, Y-3, Y-6, Y-11, and Y-18 PBU Gentlemen: Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named wells. These contain our proposals to convert them from oil wells into water injection wells. Yours very truly, Michael D. Martin Sr. Petroleum Engineer MDM: .j~CH:kkm 081 985:0639N Enclosures cc' T. N. Tyler Well Records (LR2-1) Well File #17 (" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED W E L LYi~I OTHER [] 2 Name of Operator SOHIO Alaska Petroleum Company 3 Address P. 0, Box 6612, Anchorage, Alaska 99502 4 Location of Well At Surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 7 Permit No 80-2 8 APl Number 5oq)29-20431 9 Umt or Lease Name Prudhoe Bay Unit 10 Well Number Y-6 (23-28-11 -13 )PBU 1 1. Field and Pool Prudhoe Bay 5 Elevation in feet (mndmcate KB, DF, etc ) 6 Lease Desmgnatlon and Serial No _ KBE : 81.26' AMSL ADL 28287 P~urlhne I')!l Pool 12 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF (Submit m Triplicate) (Submit m Duplicate) Perforate [] Alter Casmg [] Perforations [] Altermg Casmg Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulhng Tubmg [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent details and g~ve pertinent dates, ~dclud~ng estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) With reference to the previous Sundry Notices dated: July 16, 1980; August 19, 1980; April 27, 1985; and July 3, 1985, for the perforation of Y-6 in the 7" liner~ it is intended to convert this Prudhoe Bay production well into a seawater injection well 'for WPWZ Waterflood Project. Water will be injected through perforations (4 spf) at' 10760' -- 10772' BKB 10782' -- 10800' BKB 10820' -- 10840' BKB 10850' -- 10920' BKB 14~1 hereby certify that the foregomg ~s true and correct to the best of my knowledge The space below for Commission use Conditions of Approval, ~f arly , ~ Returned B~ ~ ~. ~E~ ByOrderof Approved by COMMISSIONER the Commission Form 10-403 Rev 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" m Dupl.cate SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO SFO/UNIT/STATE: TE:Q%CO (-Marathon) MOBIL PHILLIPS STATE-OF AK ! BPAE 3 1 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907i 265-0000 MAIL POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 8-15-85 T#: 76386 REFERENCE. SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge rece,pt by signing a copy of this letter and returning it to this office:-- Y-3 Y-6 Y-18 Temp Log 7-22-85 9050-9720 Camco #1 5" DFT 7-29-85 10600-11357 Camco #1 5" DFT 7-27-85 10750-11400 Camco #1 5" RECEIVED ~U~ Z ?~ echnical Documentation Records ~nagement 0~I & ~s Cons Commlsslor, INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE {907) 265-0000 MAIL POUCH 6-61 2 ANCHORAGE. ALASKA 99502 Date: T#: 08/02/85 76355 REFERENCE' SOH.I~AL DATA- PRESSURE SURVEY DATA. coy fOoiiOwing material is being submitted herewith. Please acknowledge receipt by signing a f this letter and returning it to this office:-- A-7 ~' Flowing Gradient 07/28/85 Camco A-10~- " " 07/19/85 Camco X-i-" " " 07/26/85 Camco X-2-- " " 07/24/85 Camco X-14~ " " 07/14/85 Camco Y-6'" Static Gradient 07/29/85 Camco ~ " " 07/27/85 Camco Y-18 · RECEIVED DATE ~ ~ ~~~a Aldridge LR2-1 _ Records - ~ - ~O~iT/~ssiO,, Management Alask;~ Olt & Gas ConS. kn~,horzge SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P O BOX 6612 ANCHORAGE, ALASKA 99502-0612 July 3, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well Y-6 (23-28-11-13) PBU Gentlemen: Enclosed, in duplicate, are the following forms for the above-named well: 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. Yours very truly, JAB:~H:elw ~D~strict etroleumEngineer (Acting) Enclosures cc: T. N. Tyler Well Records (LR2-1) Drilling Well File ~17 RECEIVED J U L 0 9 1985 A~aska 0il & Gas Cons. Commission Anchorage ' £ STATE OF ALASKA / W-LLE ALASKA~,_ ,L AND GAS CONSERVATION CCi,, .MISSION COMPLETION OR RECOMPLETION REPORT AND LO 1 Status of Well Classff,catlon of Service Well ~"/~ OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number Sohio Alaska ?etroleum Company 80-2 3 Address 8 APl Number P.O. Box 6612 Anchorage, Alaska 99502 50-029-20431 4 Location of well at surface 9 Unit or Lease Name 1318'SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM Prudhoe Bay Unit At TopProduc~ng Interval 10 Well Number 1950'NSL, 3802' WEL, Sec. 28, TllN, R13E, OPM Y-6 (23-28-11-13) ?BO At Total Depth 11 F~eld and Pool 2218'NSL 3699' WEL, Sec. 28, TllN, R13E, UPM 5 Elevauon In feet (~nd~cate KB, DF, etc ) 6 Lease Designation and Semal No Prudhoe Bay KBE = 81.26' AMSL ADL 28287 Prudhoe Oil Pool 12 Date Spudded2/2/80 13 DateT D Reached3/4/80 14 Date Comp, Susp or Aband8/1/80, 115 Water Depth' ff °ffsh°re 116 N° °f c°mpleti°nsfeet MSL one 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+'i'VD) 19 Direct~onal Survey I 20 Depth where SSSV set 21 Thickness of Permafrost [1643'MD'9621'TVD 11593'MD 9581 'TV~YES [] NO []I 2026 feetMD 2050' 22 Type Electmc or Other Logs Run )IL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, Cyberlook 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED )-0" x 30" Insulate,[ Conduct()r Surface 110' 36" 12 cu. yds. Arcticse' concrete 13 3/8" 72# L-80 Surface 2689' 17 1/2' 3854 cu. ft. ?ermafrlst 9 5/8" 47# L-80 Surfac~_ 10467' 12 1/4"1518 cu. ft. Class G: 130 cu. ft. Permafrost 7" 29# L-80 9962' 11637' 8 1/2''~ 460 cu. ft. Class G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD ~nterval, s~ze and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD) ?rudhoe Oil Pool Top: 10760' 8854' 4 1/2" 10019~ 9912~ Bottom: 10920' 8974' 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC 10760'-10772' BKB (8854'-8863' TVDss) DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED 10782'-10800' BKB (8871'-8884' TVDss) 10820'-10840' BKB (8899'-8914' TVDss) 10850'-10920' BKB (8922'-8974' TVDss) 27 PRODUCTION TEST Date F~rst Production I Method of Operation (Flowing, gas lift, etc ) 8/1/80I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Camng Pressure CALCULATED.~. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 24-HOUR RATE "~ 28 COP E DATA Bmef description of I~thology, porosity, fractures, apparent d~ps and presence of o~1, gas or water Submit core ch~ps RECEIVED JUL 0 9 1985 Alaska 0ii & Oas Cons. ., Form 10-407 ~' h ~,..rlc.oraye Subm.t ~n duplicate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29 , 30 GEOLOGIC MARKERS FORMATION TESTS NAME Include mnterval tested, pressure data, all fluids recovered and gravity, MEAS DEPTH TRUEVERT DEPTH GOR, and tlme of each phase BKB Subsea Sag River SST 10622' 8752' Shublik 10657 ' 8778' Ivishak 10750' 8847 ' · 31 LIST OF ATTACHMENTS ..... 32 I hereby certify that the foregoing m true and correct to the best of my knowledge ~ d~ , .~~~ Acting District S~gne T~tle Petroleum En§inee~bate INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases ~n Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ( STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION CO'M MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL [] OTHER [] 2 Name of Operator 7 Permit No Sohio Alaska Petroleum Company 80-2 3 Address 8 APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029-20431 4 Location of Well At Surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 5 Elevation in feet (indicate KB, DF, etc ) KBE = 81.26' AMSL 12 Lease Designation and Serial No ADL 28287 9 Unit or Lease Name Prudhoe Bay Unit 10 Well Number Y-6 (23-28-11-13) PBU 11. F~eld and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: {Submit ~n Triplicate) (Submit ~n Dupl,cate) Perforate [] Alter Casing [] Perforations ['~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repa,r Well [] Change Plans [] Repairs Made [] Other [] Pull Tub,ng [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, includ~ng estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following additional interval was perforated June 4, 1985 using Gearhart 3 1/8" carrier guns at 4 s.p.f. A lubricator was installed and tested to 3500 psi on all well work. 10850'-10920' BKB (Ref. BHCS/GR, 3/4/80) An SSSV was set and tested in the ball valve nipple at 2026',. RECEIVED JUL 0 91~ ereby cert,fy that the foregoing ,s true and correct to the best of my knowledge Alaska 0il & Gas Cons. C0mrnissio. ~ ~~~n~ Acting District Anchorage ~ T,tle Petroleum Engineer Date pa~elow for Comm,sslon use~ ~ ~.~ /~ ~ The s Cond~o~ of Approval, ~f any By Order of Approved by COMMISSIONER the Commmmon Date __ Form 10-403 Rev 7-1-80 Submit "Intentions" ~n Tr~phcate and "Subsequent Reports" m Duphcate O( STATE OF ALASKA ~~~, ,ON'r--: ALASKA ,g. AND GAS CONSERVATION CO~,,~llSS'O' HLY REPORT OF DRILLING AND WORKOVER OPERATION Drdl,ng well [] Workover operation [] Name of operator 7 Permit No. Sohio Alaska ?etroleum Company 80-2 Address 8 APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029-20431 4 Loc. at,on of Well at surface 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 5 Elevation in feet (ind,cate KB. DF, etc ) 6 Lease Designation and Se.al No KBE = 81.26' AMSL ADL 28287 9 Umt or Lease Name Prudhoe Bay Unit 10 Well No Y-6 (23-28-11-13) PBU 11 Field and Pool ?rudhoe Bay Prudhoe Oil Pool For the Month of. June ,1985 12 Depth at end of month, footage drilled, flshmg jobs, d,rect,onal dr,lhng problems, spud date, remarks 13 Casing or hner run and quantities of cement, results of pressure tests 14 Cormg resume and brief descrlpnon 15 Logs run and depth where run 1 6 DST data, perforatmg data, shows of H2S, miscellaneous data See Attached. RECEIVED J U L 0 9 1085 Alaska 0~l & Gas Cons. C0mmlssi0n Anchorage. l(~hereby certify that the foregomg ts true and correct to the best of rn'y knowledge Acting District MOTE ED TITLE Petroleu__m Enginee__r DATE !--R~~ reclu~red for eact~dar month, regardless of the status of oPerat,ons, and must be f,,~(~ ,n ~/u~,cate w,th ,he Alaska Od and G~ C~nservatmon Commission by the 15th of the succe~mng month, unless o~herw~se d~r~ted Form 10~ Subm)t m duphcate Rev 7-1-80 ( PERFORATING DATA - Well Y-6 (23-28-11-13) PBU June 4, 1985: June 10, 1985: Rigged up Gearhart and perforated the following additional interval using 3 1/8" carrier guns at 4 spf: 10850'-10920' ~B (Ref. BHCS/GR, (3/4/80) Put well on production. Set and tested SSSV in ball valve nipple at 2026' Well on production. RECEIVED JUL 0 9 1~85 Alaska Oil & Gas Cons. Comm~ss~o~, Anchorage SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P O BOX 6612 ANCHORAGE, ALASKA 99502-0612 May 9, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Wells B-16, N-12, Y-3, Y-5 and.Y-6 PBU Attention: Mr. C. V. Chatterton Gentlemen: Enclosed, in duplicate is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our subsequents to performing EDTA treatments on these wells. Yours very truly, J. A. Bragg District Petroleum Engineer (Acting) Encl6sure cc: A. E. Les ke Well Records (LR2-1) Drilling Well File #17 I ECEIVED MAY 1 5 1985 Alaska 011 & Gas Cons. Commission ' Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL OTHER [] Name of Operator Sohio Alaska Petroleum Company 3. Address ?.0. Box 6612, Anchorage, Alaska 99502 4. Location of Well At Surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 5. Elevation m feet (in~d~:ate KB, DF, etc ) KBE = 81.26 AMSL 12. Lease Designation and Ser,al No ADL 28287 8 APl Number 5o_029-20431 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number ¥-6(23-28-11-13) PBU 11. F,eld and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate I--I Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note. Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion ) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170). The following intervals in this well were treated with 100 barrels of EDTA solution on May 3, 1985. The treatment was conducted through coiled tubing as a single stage job and the well was shut in for 24 hours after the treatment. The SSSV was removed prior to stimulation and reset after the job at 2026'. 10,760' - 10,772' BKB (Ref. BHCS/GR, 3-04-80) 10,782' - 10,800' BKB ( " ) 10,820' - 10,840' BKB ( " ) RECEIVED MAY 1 5 19 5 N~sk~ Oit & Gas Cons. Commission Anchorage I hereby certsfy that the foregoing is~t[ij~.a/~d correct to the best of my knowledge T,tle Petroleum Engineer space below for Corem,ss,on use Conditions of Approval, if any By Order of Approved by, COMMISSIONER the Commission Date Form 10-403 Rev 7-1 Submit "Intentions" m Trlphcate and "Subsequent Reports" in Duphcate SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P O BOX 6612 ANCHORAGE, ALASKA 99502-0612 April 25, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells A-3, A-8, A-IiI A-27, B-91H-9, Y-3, Y-5, Y-6, Y-11~ Y-18 Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our proposals to perforate additional intervals in these wells. Yours very truly, ActingBDistrict Petroleum Engineer JAB/~'H~/jmw Enclosures cc: A. E. Leske Well Records (LR2-1) Drilling Well File ~17 RECEIVED APR 0 1985 Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL [] OTHER [] 2 Name of Operator Sohio Alaska Petroleum Company 3 Addre~ Pouch 6-612, Anchorage, Alaska 99502 4 Location of Well At Surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 5 Elevation m feet (indicate KB, DF, etc ) KBE = 81.26' AMSL 12 Lease Deslgnat,on and Serial No ADL 28287 7 Permit No 80-2 8. APl Number 50- 029-20431 9 Unit or Lease Name Prudhoe Bay Unit 10 Well Number Y-6 (23-28-11-13) PBU 11 F,eld and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF' (Submit ~n Tnphcate) Perforate [] Alter Camng [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tub,ng [] Other [] Pulhng Tubing (Note Report mult,ple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) (Submit in Duplicate) [] Altemng Casing [] [] Abandonment [] [] Other [] 13 Descmbe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~nclud~ng estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following additional interval will be perforated in May/June, 1985. A lubricator will be installed and tested to 3500 psi for all well work. 10850' - 10920' BKB (Ref. BHCS/GR, 3-4-80) An SSSV w~ll be set and tested in the ball valve nipple at 2026'. ereby cert,fy that the foregoing ,s true and correct to the best of my knowledge ~~ Acting District ~ T,tle Petroleum Engineer spa(~elow for Commlss,on use Condm{~s of Approval, ~f any Date Approved by Approved Copy Returned By Order of COMMISSIONER the Commlsmon Form 10-403 Rev 7-1-80 Submit "Intentions" tn Trlphcate and "Subsequent Reports" in Duphcate SOHIO ALASKA PETROLEUM COMPANY ANCHORAGe:, ALASKA 99502-0612 March 26, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 wells A-3¢ A-16¢ Y-3 and Y-6 PBU Attention: Mr. C. V. Chatterton Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells for the above-named wells. These contain our proposals to perform EDTA matrix treatments on these wells. JAB/~jmw Enclosures Yours very truly, D;s~;icB~agPgetroleum Engineer (Acting) cc: A. E. Leske Well Records (LR2-1) Drilling Well File ~17 RECEIVED 2 9 1985 Alaska 0il & Gas Cons. Commls'.'~on Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS I DRILLING WELL [] COMPLETED WELL [] OTHER [] 2 Name of Operator Sohio Alaska Petroleum Company 3 Address P, 0, Box 6612, Anchorage, Alaska 99502 4 Location of Well At Surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 5 Elevat,on ,n feet hnd,cate KB, DF, etc ) 6 Lease Designation and Semal No KBE = 81.26' AMSL ADL 28287 7 Permit No 80-2 12 8 APl Number 50-029-20431 9 Umt or Lease Name Prudhoe Bay Unit 10 Well Number Y-6 (23-28-11-13) PBU 11 Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF. (Submit mn Trlphcate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulhng Tubing [] Pull Tubing (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludlng estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) The following intervals in this well will be treated with 100 Bbls of EDTA solution during April/May, 1985. The treatment will be conducted through coiled tubing as a single stage job and the well will be shut-in for 24 hours after the treatment. The SSSV will be removed prior to stimulation and reset after the job at 2026'. 10,760'-10,772' BKB (Ref. BHCS/GR, 3-04-80) 10,782'-10,800' BKB ( " ) 10,820'-10,840' BKB ( " ) gnlehereb¥ certify that the foregoing ~s true and correct to the best of my knowledge ~/~ ~. ~ Acting District d T,tle Petroleum Engineer J L/l-he spj~e below for Comm lss,on use~ (/ lVlC°nd'~nsof Approval, If any Approved Copy R®turne~ sinai, /-cL .... Approved by COMMISSIONER the Cornmms~on Form 10-403 Rev 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TEXACO ~o SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907) 265 0000 MAIL POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 12/28/84 CC#: 75949 BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) REFERENCE . ~ FINAL DATA- PRESSURE SURVEY DATA ~/The following mate.al ~s being submitted herewith Please acknowledge receipt by s~gmng a copy of th~s letter and returmng ,t to th~s off,ce -- A-23 Y-2 BHPD Sheet & ?BU Survey 11/03/84 GO BHPD Sheet & PBU Survey 10/27/84 GO BHPD Sheet & PBU Survey 10/26/84 GO (4/82) RECEIVED DATE TPi-1 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE OF ~AK ! BPAE 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL POUCH6 612 ANCHORAGE. ALASKA 99502 Date: 12/12/84 CC#: 75926 CENTRAL FILES (CC# ' s-Transmittal Only) REFERENCE CASED HOLE FINAL LOGS /The following mater,al ,s be,ng submitted herew,th Please acknowledge rece,pt by s,gn,ng a (../ copy of this letter and returning It tq thts office:-- iA-4 /B-7 /B-10 /C-8 ,,E-2 /I{-7 /Y-6 CH-CN~ 11/7/84 #11 10300-10993 Sch 5" CH-CNL 11/9/84 ~9 10800-12053 Sch 5" CH-CNL 11/11/84 #2 10000-10748 Sch 5" CH-CNL 11/6/84 #13 9450-10211 Sch 5" CH-CNL 11/8/84 ~.6/~~ 9150-9955 Sch 5" CH-CNL 11/10/84 #13 9900-10950 Sch 5" Cont. Flow Survey 10/21/84 #1 11000-11320 GO 5" Cont. Flow Survey 10/27/84 #1 10100-10550 GO 5" Cont. Flow Survey 10/26/84 #1 10600-10900 GO 5" [1/84) RECEIVED DAT( _ _ 19 Victoria Aldridge TPI-1 Development Geology SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY TO SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) CENTRAL FILES(CC#'s-Transmittal Only). 311 ] C STREET ANCHORAGE ALASKA TELEP,~O ,~L (90 7) 265 0000 MAIL POUCH 6 {512 ANCHORAGE. ALASKA 99 502 Date' 8/19/83 CC#.74666 REFERENCE $/~H~O CASE_____qD HO____LE FINAL LOGS VThe mater,al ,s be,ng submitted herew,th Please acknowledge rece,pt by s~gn,ng a folJow~ng copy of th~s letter and returmng ~t to th~s off~ce - SFO/UNIT/STATE: X-14 B-10 F-18 N-10 Y-6 GEL 6/18/83 #3 11151-12202 Sch 5" DFT 7/30/83 #1 10100-10761 Camco 5" DFT 8/2/83 #1 11950-12450 Camco 5" DFT 8/4/83 #1 10250-10580 Camco 5" DFT 7/31/83 #1 9900-11577 Camco 5" (4/82) RECEIVED DATE -- a Aldridge TP1-5 '~ .... , Development Geology , ~9 Well Records SOHIO ALASKA PETROLEUM COMPANY o SF0 ARCO - CHEVRON 311 ~ ' C ' SI~qEET ANCHORAGE ALASKA TELEPHONE I907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 ~o SFO/UNIT/STATE: (-Marathon) E~XON GETTY MOBIL PHILLIPS STATE BPAE (Transmittal Only) _ CENTRAL FILES (CC#'s - Transmittal Only) 7/26/83 Date: Trans.#: - 74603 CC#: REFERENCE: SO~I~FINAL DATA - PRESSURE SURVEY DATA /- ./~e following material ts be,ng subrnltted herew,th. P~ease ackno~v~edge receipt by signing a ~./ copy of th,s letter and returmng it to thIs office:-- A-29/ BHPD & Pressure Analysis 6/01/83 Camco B-18'-'~ Pressure Survey 7/07/83 Otis B-19v " " 7/05/83 Otis B-20'" " " 7/09/83 Otis B-21~ HP Pressure Analysis 7/11/83 Camco B-22- t " " " 7/03/83 Camco B-23~j " " " 6/25/83 Camco D-6~ Pressure Survey 7/12/83 Otis G-3 ~' " " 7/12/83 GO Q-3~ HP Pressure Analysis 7/07/83 Camco R-10 z~ HP Pressure Analysis 7/08/83 GO R-16/ BHPD & Pressure BU Survey 6/6-7/83 Dres X-3~ BHPD & Pressure Analysis 6/20/83 Camco X-9/ BHPD & Pressure Survey 6/04/83 GO X-16/ BHPD & Pressure Survey 5/18/83 Otis X-17z Pressure Survey 5/11/83 Otis X-17 BHPD 5/24/83 Otis X-17 Pressure Survey 5/22/83 Otis Y-2~ BHPD & HP Pressure Analysis 5/15/83 Camco Y-6/ Pressure Data 7/07/83 GO 4/82) RECEIVED DATE Victoria Aldridge Development Geology Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL POUCH 6-612 ANCHORAGE. ALASKA 99502 ~o SFO/UNIT/STATE: (-Marathon) EXXON GETTY MOBIL PHILLIPS STATE OF AK BPAE (Transmittal Only) _ CENTRAL FILES(CC#'s-Transmittal Only). Date: 10/12/82 Trans.#: 27 29 CC#: 55729 REFERENCE' SOHIO~D HOLE~ FINAL LOGS f lowing mate.al ~s bemg submItted herewith. Please acC. nowledge receipt by signing a thIs letter and returning it to th~s office.-- SFL/UN,IT/STATE ONLY: M-16/ TDT-M 8/31/82 #1 11740-11685 Sch 5" A-19~ TDT-M 8/28/82 #1 8850-9767 Sch 5" Y-6'' Spinner 8/11/82 #1 10900-10441 GO 5" E-11~ Spinner 8/31/82 #1 10300-10661 Otis 5" R-8--- Spinner 9/13/82 #1 10900-11250 Otis 5" E-i~~ Spinner 9/10/82 #1 10250-10672 Otis 5" A-19j EPL 8/29/82 #1 8950-9300 Sch 5" G-7j PAL 8/26/82 #1 0-9730 Sch 5" C-14j PAL 9/5/82 #1 0-10300 Sch 5" G-7¢~' ETT 8/26/82 #1 2590-9730 Sch 5" G-7~' Tubing Cutter 8/23/82 #1 --- Sch E-10/ Completion Report 9/2/82 #1 10100-11688 Sch 5" (4/82) RECEIVED ..... DATE ..... ~'~'¢ ~ ~',-:-:~o'." Victoria Aldridge Development Geo ]ogy ~?,'"!.:.~.,_,__,~_ ~9 ~ Well Records TP1-5 _ - _ ,; SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON GETTY ~o SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) 3111 "C"SIREET ANCitORAGE. ALASKA TELEPHONE 19071 265-0000 MAIL.: POUCH 6-612 ANCHORAGE. ALASKA 99502 CENTRAL FILES (CCfl's - Transmittal Only) REFERENCE: O FINAL DATA- PRESSURE SURVEY DATA. The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-12/ Pressure Survey & BHPD A_10/ ,, ,, A-ii/ " " A_16~, ,, ,, A-17 / " " B-16 / " " H-8 .' " " J_lO/ " ,, y_6/ " ,, N-15" Pressure Survey R_3/ ,, E-7' Pressure Survey & BHPD M-15-~ Pressure Survey & BHPD A-18 z'- " " M_16~/ ,, ,, R_7/ ,, ,, R-8 / " " Y-11 / " " 7/25/82 Dres. 7/31/82 GO 7/24/82 GO 7/24/82 GO 7~28~82 GO 7/27/82 GO 8~4~82 co 8/13/82 GO 8/11/82 CO 8/10/82 CO 8/6/82 Sch 7/23/82 Sch 8/13/82 Camco 8/14/82 Camco 8/15/82 Camco 8/7/82 Camco 8/11/82 Camco 7/27/82 Camco 32) RECEIVED DATE Al~,k~ ()il & (~ r,,,r,~, ~' ...... Karen Mestas AllLhOrage Development Geology ~ Well Records SOHIO RESTRICTED SOHIO ALASKA PETFIOLEUM COMPANY ARCO , TO SFO/UNIT/STATE: Mo~l , (-Marathon) ~ll,[~ __ - .... BPAE T_ra. nsm,ittal Only _ 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (9071 265 0000 MAIL. POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 3/9/82 1417 REFERENCE SOHIO FINAL DATA CASED HOLE FINAL LOGS The following mater~al IS being submitted herewith. Please acknowledge receipt by s,gning a copy of this letter and returmng It to this office:-- B-6 H-4 H-4 Y-6 Spinner #2 2/19/82 (Otis) Flowmeter(CFS) #1 1/16/82 (Go) Flowmeter(CFS) #1 2/5/82 (Go) Hydro Log #1 2/1/82 (Go) 8800-9150 5" 11400-11810 5" 11400-11810 5" 9900-10900 5" Carol ,.Wrieter Deve!o.~ment G-to_~ We ll.j~.e ccrd z SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 "C" STREET ANCHORAGE, ALASKA SOHIO-BP ALASKA PRODUCTION DIVISION TO- REFERENCE: SFO , ii i · i ~_ il i ii · i -- -- ~ TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 /H~O CASED HOLE FINAL LOGS ~T,,h,,e following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- Flowmeter 12/3/80 #1 9700-10050 Flowmeter 12/9/80 #1 10450-10900 11 Joanne Woods for Carol Krieter Well Records DATE SOHIO PETROLEUM COMPANY D~vision of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO' SFO/UNIT/STATE: (-Marathon) OMN~ COMM COMM ---R'~.5 U,'4G / 3111 "C" STREET ] ENO 4NCHORAGE ALASKA --~-ENO --'J ' :~-cN.~ TEJI_EPHONE (907) 265-0000 -4 ENG---J MAIL: POUCH ~612 _ 1 OEOLANCJHORAGE ALASKA 99502 /80 #526 REFERENCE ~"~-Sl~t~ ~- ' :~' ~-_L _, J SOHIO DATA ~The following material is being submitted herewith. Please acknowledge receipt by mgning a copy of th~s letter and returning it to this office:- Y-5 Bottom Hole Pressure Data Form and Survey 12/4/80 12/7/80 J. Woods for Carol Krieter Well Records DATE Alaska 0il & Gr~q Cons. Commius~ud ~9 ~ SOHIO PETROLEUM COMPANY ,7 Division of Soh,o Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO SFO/UNIT/STATE (-Marathon) REFERENCE. Mobd , BFA~ ~, SFO. ...... ANCHORAGE, A~ASKA TELEPHONE (907t 265-0000'' MAI L: POUCH ~6-61:2 ANCHORAGE, ALA~! GT~,~ TEC 9/26/80 11379 SOHIO FINAL CASED HOLE DATA ~~The following material is be,ng submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- C-7 Spinner 8/11/80 #1 D-5 Flowmeter 7/15/80 #1 D-8 Spinner 8/13/80 #1 D-9 TDT-M 7/18/80 #1 GC-3D Collar Log 8/7/80 #1 M-1 Spinner 8/18/80 #1 M-2 EPL 8/17/80 #1 X-2 EPL 8/21/80 #1 X-9 EPL 7/27/80 #1 X-9 EPL 7/31/80 #2 r'"'~ cch 8/1/80 #1 5~! 5" 5" 5" 5" 5" 2" 5" 5" 5~ Well Records /2"/5" /5" DATE [ ....' 19 __ SOHIO ALASKA PETROLEUM COMPANY August 20, 1980 ! COA AA'Z'q, ~ IRES' EN~-- ENG_____ ~HOr~ ~o~ d~ ~ EN~ ' MA~L POUCH 6-(~ GEOL ANCHORAGE, ALASKA 9~5~O~ I 3 GEOL CON~ID~N~IAD ~ STAT TE~ STAT TEC-- CONFER: FILF: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 Attn: Mr. H. H. Hamilton Re: Wells GC-3D (30-11-14); D-10 (43-22-11-13); d~~Y-6 (23-28-_]_L=L3~-.-~ Gentlemen: / Enclosed please find, in duplicate, Forms 10-403, Sundry Notices and Reports on Wells, and Forms 10-404, Monthly Report of Drilling and Workover Operations for the above-referenced wells. Very truly yours, S~O ~OLEUM COMP32qY GD~sJt;i~tl~SF~eald Engineer GJP:JH:mlh Enclosures cc: S. R. Bundy A. E. Leske Drilling File Geology I='orrr~ 10-403 REV. 1-10-73 Submit "1 ntentlons" In Triplicate & "Subsequent Reports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL L_J OTHER 2. NAME OF OPERATOR Sohio Alaska Petroleum Cc~pany 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL At surface 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc..) KBE = 81.26' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20431 6. LEASE DESIGNATION AND SERIAL NO. ADL 28287 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. Y-6 (23-28-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 28, TllN, R13E, UPM 12. PERMIT NO. 80-2 3ort, or Other Data TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) NOTICE OF INTENTION TO: - SUBSEC~UENT REPORT OF: -- - - MULTIPLE COMPLETE FRACTURE TREATMENT /~LTERING CASING ABANDON* SHOOTING'OR ACIDIZING ABANDONMENT* CHANGE PLANS (Other) (NOTEt Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, includmg estimated date of starting any proposed work. ~ne follc~ing intervals were perforated August 1, 1980, using GO Int' 1. 3 1/8" carrier' guns at 4 spf: 10,760' - 10,772' 10,782' - 10,800' 10,820' - 10,840' (12') (Ref. BHCS/GR, 3/04/80) (18') (" · " " ) (20') (" " " ) An SSSVwas set ar~ tested in the ball valve nipple ca. 2000'. (T~ space for State office use) ~/~ APPROVED BY. TITLE CONDITIONS OF APPROVAL, IF ANY: DATE See Instructions On Reverse Side FormNo 10-404REV 3-1-70 ( SUBMITIN DUPLICATE ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20431 6. LEASE DESIGNATION AND SERIAL NO. ADL 28287 1. 7. IF 'NDIAN'ALOTTEE OR TRIBE NAME OIL ~ GAS [] WELL' ~-*-~ WELL OTHER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Sohio Alaska Petroleum Company Prudhoe Bay Unit West 3 ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchorage, AK 99502 Y-6 (23-28-11-13) 4 LOCATION OF WELL At Surface: 1318' SNL, 5055' WEL, Sec.34, TllN, R13E, UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11 SEC. T R. M. (BOTTOM HOLE OBJECTIVE) Sec. 28, TllN, R13E, UPM 12 PERMIT NO 80-2 July 21, 1980: August 1, 1980: August 7, 1980: August 9, 1980: August 9, 1980: 13. REPORT TOTAL DEPTH AT ENO OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Pressure tested tubing and inner annulus. Rigged up G.O. International and perforated the following intervals using 3 1/8" carrier guns at 4 s.p.f.: 10,760'-10,772' (12') (Ref. BHCS/GR, 3/4/80) 10,782'-10,800' (18') (" " ") 10,820'-10,840' (20') (" " ") Put well on production. Shut in well in preparataion for static pressure survey. Ran static pressure/temperature survey at 8800' TVDss. Set and tested insert sleeve and SSSV in ball valve nipple ca. 2000'. Well on production. 14. I hereby certl t a he foregol true and correct SiGNE~ ~ TITLE DISTRICT FIELD ENGINEER DATE NOTE-Report on th,s~form is required for each calendar month, regardless of the status of operations, and must be filed ,n duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. JH:mlh SOHIO ALASKA PETROLEUM COMPANY August 28, 1980 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well Y-6 (23-28-11-13) Enclosed, in duplicate, is Form P-7, Completion Report, for the above-named well together with the Well History. This well has been perforated and is now on production. RHR:ja Enclosures cc: Well File #17 Geology Yours very truly, District Drilling Engineer Form P--7 STATE OF ALASKA (see other In- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la TYPE OF WELL OwIELLL~'~ GAS I-"1 WELLI I DRYD Other b TYPE OF COMPLETION NEW ~ WORK DEEP-I---I PLUG ~ DIFF WELLI~I OVER [---] EN I I BACKI I RESER D Other 2 NAME OF OPERATOR Sohio Alaska Petroleum Company 3 ADDRESS OF OPERATOR Pouch 6-612, Anchoraqe, Alaska 99502 4 LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* Atsurface 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, OPM At top prod interval reported below At total depth 5 APl NUMERICAL CODE 50-029-20431 6 LEASE DESIGNATION AND SERIAL NO ADh 28287 7 IF INDIAN, ALLOTTEE OR TRIBE NAME 8 UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9 WELL NO ¥-6 (23-28-11-13) 10 FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil 11 SEC, T, R, M, (BOTTOM HOLE OBJECTIVE) 1950' NSL, 3802' WEL, Sec. 28, TllN, R13E, UPM 2218' NSL, 3699' WEL, Sec. 28, TllN, R13E, UPM Pool Sec. 28, TllN, R13E, UPM 12 PERMIT NO 80-2 2/2/80 3/4/80 8/1/80 KBE 18 TOTAL DEPTH MD & TVD/19 PLUG BACK MD & TVDI20 IF MULTIPLE COMPL l1643'ND $621'TV~ lig~§'~D 9581'~VDIHOW MANY° ' 22 PRODUCING INTERVAL(S), OF THIS COMPLETION - TOP, BOTTOM, NAME {MD & TVD)* Prudhoe Oil Pool Top: 10760'ND 8935'TVD Bottom: 10840 'ND 8995 'TVD ELEVATIONS (DF, RKB, RT, GR, ETC)* 117 ELEV CASINGHEAD I = 81.26' AMSL I 51.76' AMSL i 21 ROTARY TOOLS INTERVALS iDRILLED BY CABLE TOOLS Total 23 WAS DIRECTIONAL SURVEY MADE Yes 24 TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GRf BHCS/GRf FDC/CNL/GR/Cal~ C~;berlook 25 CASING RECORD (Report all strings set In well) CASING SIZE 20"x30" 13 3/8" 9 5/8" 7" WEIGHT, LB/FT / GRI Insulated C~ndt 72# /L-~ 47~ n-~ 29# n_( ,DEI DEPTHSET(MD) lct~r 110' ;0 ! 2689' ;0 ! 10467' I0 19962-11637' HOLE SIZE I CEMENTING RECORD / AMOUNT PULLED 36" ~12 cu.yds. Arcticset concrete 17 1/2'13854 cu. ft. Permafrost 12 1/4'I1518 cu,ft. Class G;130cu[ft. Permafrost 8 1/2'~ 460 CU. ft. Class G 26 LINER RECORD SIZE I TOP (MD) BOTTOM {MD) SACKS CEMENT* I 28 PERFORATIONS OPEN TO PRODUCTION (Interval, size and number) ! 10760-10772 'BKB 0.5"@4spf (Ref. BHCS/GR, 3/4/80) ~_10782-10800 'BKB " " ( " ) 310820-10840' BKB " " ( " ) 274 I TUBING RECORD SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD) 1/2" 10019 ' 9912 ' 29 ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) I AMOUNT AND KIND OF MATERIAL USED 30 PRODUCTION /DE-J~ODUCTION IPRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) STATUS (Producln§ or iww,, 1/8~0 '~ I Flowing Is"ut''n) Producing D'A"I'~'-OI~TEST !HOURS TESTED ICHOKE SIZE I PROD'N FOR OI L-BBL FLOW TUBING CASING PRESSURE ~ CALCULATED OIL--BBL GAS--MCF ., .~, ~.~ ~1 ~:~ I 32 LIST OF ATTACHMENTS ~ ~[,~':",., ~)t~ ~ L, ~ ............ ' Well History f:' ,~,'he, -,?',' 33 I hereby certify th~he fore~goln~tion is copnplete and correct as determined from all available records SIGNED t~~ TITLE District Drilling Rngineer R. H .-Reile~; ~ *(See instructions and Spaces for Additional Data on Reverse Side) DATE INSTRUCTIONS General' This form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given other spaces on th~s form and ~n any attachments. Items 20, and 22: If th~s well is completed for separate production from more than one Interval zone (multiple com- pletion), so state in ~tem 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the ~nterval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional ~nterval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement" Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, 35 GEOLOGIC MARKERS WATER AND MUD NAME MEAS. DEPTH TRUEVERT DEPT BKB Subsea Sag River SST. 10622' 8752' Shublik 10657' 8778' Ivishak 10750' 8847' 36 CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. WELL Y-6 (23-28-11-13) WELL HIS%~DRY DRILLING February, 1980 Spud well at 0515 hours, February 2, 1980. Drilled 17 1/2" hole to 2715'. Ran 69 jLs. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 3854 cu.ft. Permafrost cement. Installed and tested BOPE. Cleaned out to 2647', tested casing to 3000 psi. Drilled out shoe, ran leak-off test. Directionally drilled 12 1/4" hole to 10474'. Ran open hole logs. Ran 268 its. 9 5/8" 47# L-80 Buttress casing to 10467'. C~ted in ~o stages: First stage with 1518 cu. ft. Class G cement; second stage through D.V. packer at 2596' with 130 cu.ft. Permafrost cement preceded byArctic Pack. Cleaned out to 10467', tested casing to 3000 psi. Drilled out to 10497', performed formation co~mpetency test. Directionally drilled 8 1/2" hole to 10667'. March, ]980 Directionally drilled 8 1/2" hole to 11643'. Ran open hole logs. Ran 42 jts. 7" 29# L-80 Buttress casing to 11637'. Cemented with 460 cu. ft. Class G cement. Cleaned out to 11593', tested casing to 3000 psi. Changed well over to NaC1. Ran CBL. Ran 316 jts. 4 1/2" 12.75# L-80 CS Hydril tubing to 10019'. Landed tubing with ball valve at 2027'. Installed and tested tree. Displaced tubing to diesel. Set packer at 9912', tested tubing to 3500 psi. Released rig at 1330 hours, 3/12/80% PEPJ'ORATING August, 1980 The following intervals were perforated August 1, 1980 using GO Int'l. 3 1/8" carrier guns at 4 s.p.f.: , 10760' - 10772' (12') (Ref. BHCS/GR, 3/4/80) 10782' - 10800' (18')( " ) 10820' - 10840' (20')( " ) A SSSV was set and tested in the ball valve nipple ca. 2000'. SOHIO ALASKA PETROLEUM COMPANY July 15, 1980 State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 Attn: Mr. H. Hamilton Subject: Wells D-10, C-14, C-15, X-5, Y-6 3111 'C" STREE]~'--i ,- .. -'"- / I I MAIL: POUCH 6-6i2 J 4 IS'rAT FI[F: -' ' Enclosed please find in triplicate form 10-403, Sundry Notices and Reports on wells for the above referenced well. Enclosures CC: S. R. Bundy A. E. Leske Drilling File Very truly yours, SOHIO PETRD~ CO. District Field Engineer Forr~ ;~3-403 "REV. 1-10-73 Submit "1 ntentlon$" In Triplicate & "Subsequent Reports" In Duplicate STATE O~ At.~SK~ OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) OiL ~ GAS l---I WELLI~-I WELL OTHER 2. NAME OF OPERATOR Sohio A]aska Petroleum Cc~pan¥ 3. ADDRESS OF OPERATOR Pouch 6-612, Anchoraqe, Alaska 4. LOCATION OF WELL At surface 99502 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc_) KBE = 81.26' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS 5. APl NUMERICAL CODE 50-029-20431 6. LEASE DESIGNATION AND SERIAL NO. ADL 28287 7. IF INDIAN, ALLOI I EE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. ¥-6 (23-28-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool Il. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 28, TllN, R13Er UPM ~2. PERM.T NO. 80--2 )OFt, or Other Data SUBSEQUENT REPORT OF= WATER SHUT-OFF [~ REPAIRING WELL FRACTURE TREATMENTH ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Otl~er) (NOTE.. Report results of multiple completion on Well Completion or Recomplet~on Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ~letells, and give pertinent dates, including estimated date of starting any proposed work. The follc~ing intervals will be perforated during July/August 1980 using GO Int'l. 3 1/8" carrier guns at 4 spt: 10760' - 10772' 10782' - 10800' 10820' - 10840' (12') (Ret. BHCS/GR, 3/4/80) (18')( " ) (20') ( " ) A SSSV will be set and tested in the ball valve nipple ca. 2000'. Subs~-q-ffe~t Worl< ~o~tecl ~. _ SIGNEI~II'~/ _~i TITLE District Field En~ineerq ~. ,7. ~_¥.~ ~ ..~, {This space for State ~ff u~) APPROVED BY TITLE CONDITIONS O~PROVAL, I ~ ~Y: ~ ORDER DATE See Instructions On Reverse Side DATE Approved Copy Returned SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TELEPHONE (907) 26 MAIL' POUCH 6-6 ANCHORAGE, ALASK, FILF: EXXON 6/20/80 #221 PHILLIPS SFO REFERENCE SOHIO MAGNETIC TAPES Jc h~e follow~ng mater~al ~s being submitted herewith. Please acknowledge receipt by mgn~ng a opy of th~s letter and returning ~t to th~s office.- C~-17 5/5/80 Tape ~60467 g-7 4/7/80 " #60420 g--8 ---4/27/80 " #60456  3/4/80 " #60336 Anne Barns Well Records ~ SOHIO PETROLEUM COMPANY 3~ "c' STI~E',[.!_~--O_!.~.~.~ ~ D,v,s,on of Sohio Natural Resources Company ANCHORAGE./~ .L-I~_ f~~4 TELEPHONE (907] 26§-0000'_-_-~.. ..... _. __ SFO/UNIT/STATE REFERENCE SOHTO DATA  .... __ i J ~ Iii_ I _ j i i i~ j I_ I Ill ~dhl~ -- - " - -- ~°AE _ , , -- JII I_ ! I _ 5/8/80 #132 The material is. being submitted herew,th. Please acknowledge receipt by signing a follow, ng copy of this letter and returning it to th~s off~ce.- SFO/UNIT/STATE: F-14 (-Marathon) ~ Temperture Log Temperture Log 3/27/80 #1 5" 3/26/80 #1 5" Well Records SOHIO PETROLEUM COMPANY Divmon of Sohio Natural Re~urce$ Company 3111 "C"STREET ANCHORAGE, ALASKA SOHIO-BP ALASKA PRODUCTION DIVISION TO SFO/UNIT/STATE :~FO/UNIT/STATE (-Marathon) SFO/%YNIT/STATE: TELEPHONE (907) 265 O000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 l~ll,~ .._ .._:. _~_. _ . SFO :_---_ = _.._, ..... ,,_ j ~EFE~EN~E' ' SOHIO CASED HOLE FIN~ DATA ~oHomno material is ~in~ subm~ herewith. Please acknowl~ receipt b~ s~n~n~ a cop~ of th~ iener and return~n~ it lo th~s o~ce:- B-9 TDT-M B-13 Diff. Temp. B-16 Perf. CCL C-15 Temp. E-4 Spinner H-7 Spinner J-6 Spinner M-1 Temp. M-2 CCL M-6 CCL M-7 CCL X-4 Mudlog West Sak #14 Mudlog FDC/CNL 4/24/80 t/114 3/23/80 #2 7/13/79 #1 5" 2/29/80 #1 5" 3/25/80 #1 5" 3/16/80 #1 5" 2/29/80 #1 5" 2/25/80 #1 5" 3/12/80 #1 5" 3/9-10/80 #1 5" 3/10-11/80 #1 3/13-14/80 #1 5" 12/25/79-1/23/80 (State only) 3/25/80-4/12/80 (State only) 3/4/80 #1 2" % Carol ~ieter Well R&cords 19 DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO STATE OF ALASKA 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 /80 #099 REFERENCE: SOHIO OPEN HOLE FINAL DATA /"he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Y-6 DIL 2/25/80 & 3/4/80 #l&2 2" & 5" Y-6 BHCS 3/4/80 #1 2" & 5" Y-6 FDC 3/4/80 #1 2" & 5" Y-6 FDC/CNL 3/4/80 #1 5" Y-6 Gyroscopic Survey 3/26/80 ~a~ol Kr£et~ Well Records SOHIO ALASKA PETROLEUM COMPANY April 9, 1980 Alaska Oil & Gas Conservation Cc~mission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton 3111 "C" STREET ~/~ ANCHORAGE. TELEPHONE {907)~5-0, ANCHORAGE, ALASKA 9 ! I sr,tT TE~ Gentlemen: Well Y-6 (23-28-11-13) Enclosed, in duplicate, is Form P-7, Completion Report, for the above-named well together with the Well History, Well Logs, and Directional Survey. This well has been suspended pending perforating operations. AMR:ja Enclosures cc: Well File #17 Geology Yours very. truly, Austin Reid Acting District Drilling Engineer RECEIVFD F°r2 13--7 SUBMIT IN ~-TATE OF ALASKA reverse side) 5 APl NUMERICAL CODE el L AND GAS CONSERVATION COMMITTEE 50-029-20431 B LEASE DESIGNATION AND SERIAL NO WELL COMPLETION OR RECOMPLETION REPORT AND LOG* ADL 28287 la TYPE OF WELL OWIiELLL~ GASwELLi ir~ DRYD Other 7 IF INDIAN, ALLOTTEE OR TRIBE NAME b TYPE OF COMPLETION NEW ~ WORK DEEP- PLUG [~1 DIFF WELLIAI OVER [~] EN [-"] RESER [~ Other BACKI I 8 UNIT, FARM OR LEASE NAME 2 NAME OF OPERATOR Prudhoe Bay Unit ~o .~3.aska Petroleum ~y 9 WELL NO 3 ADDRESS OF OPERATOR Y-6 (23-28-11-13) Pouch 6-612, Anchorage, Alaska 99502 4 LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* Atsurface 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM ~, SEC,T.R,M,(BOTTOMHOLE OBJECTIVE) At top prod interval reported belowtop of Sag Re SST. 1666' NSL, 3357' WEL, Sec. 28, TllN, R13E, UPM At total depth 12 PERMIT NO 2218' NSL, 3699' WEL, Sec. 28, TllN, R13E, UPM 80-2 I DEPTH HOW MANY* ' 21 ROTARY TOOLS INTERVALS DRILLED BY CABLE TOOLS 11643'MD 9621'TVDI 11593'MD 9581'TVDI Total 22 PRODUCING INTERVAL(S), OF THIS COMPLETION -- TOP, BOTTOM, NAME (MD & TVD)* 23 WAS DIRECTIONAL SURVEY MADE 10 FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool Sec. 28, TllN, R13E, UPM 24 TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, Cyberlook 25 CASING SIZE 20"x30" 13 3/8" s7 " 7" 26 CASING RECORD (Report all strings set in well) WE,GHT,'B/FT ! GRADE ~ DEPTH SET Insulated Cbnductdr 110 ' 72~ I L-801 2689' I -s01 29# I ~-80 19962-11637' LINER RECORD SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* (Interval, size and number) 28 PERFORATIONS OPEN TO PRODUCTION HOLE SIZE I CEMENTING RECORD / AMOUNT PULLED I / 36" 12 Cu.vds. Arcticset concrete 17½" 13854 c~.ft. PP_~n~frn.~f c~m~.nt. 27 TUBING RECORD SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD) 4½" 10019 ' 9912 ' 29 ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED DATE FIRST PRODUCTION PRODUCTION PRODUCTION METHOD (Flowing. gas lift, pumping--size and type of pump) I WELL STATUS (Producing or shut-In) FLOW TUBING CASING PRESSURE RA~TE PR ESS r 31 DISPOSITION OF GAS (Sold, used for fuel, vented, etc ) 32 LIST OF ATTACHMENTS Well History, Well Logs, Directional Survey GAS--MCF WATER--BBL I GAS--el L RATIO I\ IL, '~WI~Eh-~IB~[, L~ IO~LGRAWTV-Am (CORR) I ;'~- ~ ~ 0 '~T WITNESSED BY / DATE 33 I hereby certify that the foregoing and attached Information Is coynplete and correct as. determined from all available records EFW: i~sIGNEDAUSI~ ml(/' TITLE District Drilling Engineer *(See instructwons and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: IndIcate which elevation is used as reference (where not otherwIse shown) for depth measurements given in other spaces on this form and m any attachments. Items 20, and 22: If this well ~s completed for separate production from more than one ~nterval zone (multiple com- pletion), so state in ~tem 20, and in ~tem 22 show the producing interval, or ~ntervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each ~nterval to be separately produced. (See ~nstruct~on for items 20 and 22 above). 34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35 GEOLOGIC MARKERS NAME MEAS DEPTH TRUEVERT. DEPT BKB Subsea Sag R. SST. 10622' 8752' Shublik 10657 ' 8778 ' Ivishak 10750 ' 8847' - ~' 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. · WELL Y-6 (23-28-11-13) WELL HISTORY Feb~nmry, 1980 Spud ~ell at 0515 hours, February 2, 1980. Drilled 17 1/2" hole to 2715'. Ran 69 jts. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 3854 cu. ft. Permafrost cement. Installed and tested BOPE. Cleaned out to 2647', tested casing to 3000 psi. Drilled out shoe, ran leak-off test. Directionally drilled 12 1/4" hole to 10474'. Ran open hole logs. Ran 268 jts. 9 5/8" 47# L-80 Buttress casing to 10467'. Cemented in two stages: First stage with 1518 cu. ft. Class G cement; second stage through D.V. packer at 2596' with 130 cu. ft. Permafrost cement preceded by Arctic Pack. Cleaned out to 10467', tested casing to 3000 psi. Drilled out to 10497', performed formation competency test. Directionally drilled 8 1/2" hole to 10667'. March, 1980 Directionally drilled 8 1/2" hole to 11643'. Ran open hole logs. Ran 42 jts. 7" 29# L-80 Buttress casing to 11637'. Cemented with 460 cu. ft. Class G cement. Cleaned out to 11593', tested casing to 3000 psi. Changed well over to NaC1. Ran CBL. Ran 316 jts. 4 1/2" 12.75# L-80 CS Hydril tubing to 10019'. Landed tubing with ball valve at 2027'. Installed and tested tree. Displaced tubing to diesel. Set packer at 9912', tested tubing to 3500 psi. Released rig at 1330 hours, 3/12/80. R£CE!VFD , spepp -sun d. A. Fouch~ President March 28, 1980 Mr. Gary Plisga Sohio Alaska Petroleum Ccmpany 3111 C. Street -- Anchorage, AK 99503 Our Boss Gyroscopic Survey Job No. Boss-16561 Well Y-6 Prudhoe Bay Field North Slope, Alaska Date of Survey: March 26, 1980 Dear Mr. Plisc3a~ Please find enclosed the "OrigiD~l" and sixteen (16) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity to be of service. Yours very truly, ~Y-SUN, INC. Ken Broussard District Manager KB/kc Enclosures ---.~CHIO-ALASKA-PEJROLEUE COPPANY PRUDHOE BAY ....... ALA$ K A SPERRY'BUN kELL SURVEYING COPPAkY PAGE ANCPORAGE, ALASKA .................. LATE OF SURVEY_M~RCB__26L1980 COMPUTATION DATE BOSS GYROSCOPIC SURVEY APRIL 2, 19fl0 ,JOB NUMBER BOSS-1656! KELLY BUSHING .......................... TRUE ......... SUB-SEA.- . MEASURED VERTICAL VERTICAL 1NCL DEPTH DEPTH DEPTH DE 0 0,00 '81,26 100 100.00 18,74 ............ -~00 20-~o00 ....... 118.7A · 300 300-00 218,74 qO0 399.q9 318,73 5013 ~q99 °99 .... Z~l 8+7-.3 600 599,99 518,73 700 699,99 618,73 80-0 .... -7.99 .-99 ....... 2.18.73 900 899.98 818,72 - 1000 '999o98 918.72 1200 1199.98 1118,72 1300 1299,97 1218,71 ~-1-4 ~-, ---15 99.97- ...... 1-31.8 · 7-1 1500 1A99.96 1~18.70 1660 1599.96 15~8,70 I~BO ....... 1 ~99 * 9& .......1 l~O0 1799,96 1718.70~ 1900 1899,96 1818,70~ COURS£ __- CCURSE ..... DOG-LEG- ........... TOTAL _ INATION EIPECTIGN SEVERITY RECTANGULAR COORDINATES VERTICAL G MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 0 0 N O. O E 0.00 O.O0 O.OO O.OO 0 13 N 82, A E ,22 ,03 N ,19 E -.~2 O.-16 ...... S. 712L. 4A E .............. .12_ .O3..S ........ .5,_.E ............. 0 22 S 83.20 E ,12 .lq S 1,13 E -,93 O 25 S 61. 8 E .16 .36 S 1.77 E -1.55 o~23 ........ $-33 ,-~ 3- E ,. 19 ....... ,81-_ S 2~, 2..7---5 - 2_,2.t__ 0 23 h 82,10 E .Al 1.04 S 2,78 F -2.77 0 22 S 86.26 E .Off 1.02 S 3,¢4 E -3,23 13_ i5 ....._N_~9...5g-.E · 12.-- 1,04__S ......... 3_~9'L_E -i,6L 3 27 S P. 0.56 E ,21 1,10 S 4,58 [ 0 19 S 2~,55 E .38 1,A2 $ 5,08 E -A.72 0 _ 22 ...... S__2~,52__E_ .......... · 05 ....... .1. · 9.6_S__ 5~33__5 -~,.2~ O 32 S A5.56 E .23 2.58 S 5,79 E -6.03 0 37 S 27,43 E ,20 3,:38 S 6,37 E -7.00 d 34 ...... S-..q5_.q~ E ...... ,19 ...... 4,20_S ......... ~6.._97 _g ..... -..ZJ_~_~__ 0 22 .21 0 25 ,11 {3 4.5- .25_ 9 22 ,14 0 . 24 .......S..~0.,_32.E_ _' . __, 11 O 28 N 89.q0 E .10 53.1~ E 38.32 E _7-2.1~. -F 59. 8 E 65,3R E PlO0 2099.95 2 O18,69 I'"lrl 2200 2199,95 2118- 69 t"='~ O0 19 N 71.22 E .19 2400 2399,9~ 231a,68 2500 2q99.93 2418.67~ ~O 22 N 46,52 E .60 27C0 2699.92 2618,66 ~ ~E 1~ N 76,28 E .55 28~0 2799,9~ 271~,66 3000 2999,88 2918,62 ~ 1 38 N 68,20 W 1,96 q,Tq S 7,58 E -8,81 5,22 S 8,06 E -9.48 fi.. 57_ _S- 8.,-q-9--5 - IA, O._q __ 5,74 S 8,~8 E 5,98 S 9,34 E '10,95 .6.1.7_.~ ....... 9_.gfL_E ' 1.1_,55___ 6,23 S 10,73 E -12.14 6.1A S 11.40 E -12.57 5,52 S 12,26 E '12.80 4,77 S 13,15 E -12,97 A ,14 ~ ........ 13-.9-7--E 'll.-1._L 3,66 S 14,80 E -15,44 4.25 S 15,22 E -lq,15 5,q7._S ...... !5.36 ~ - 1.5,_DL. 5,53 S 14,01 E -IA.Il ---~$¢H~0 AL ASK A-P ETR OL-E UN PPUDHOE BAY COMPANY- SPERRY-SUN WELL SURVEYING COPPANY ANCHORAGEe ALASKA CONPU'rATION DATE APRIL 2e 1980 PAGE 2 -CATE CF SURVEY MARCH--2G~--lgRO- FOSS GYROSCOPIC SURVEY JOB NUMBER BOSS-16561 ..... KELLY BUSHING--£LEV= ----R1~26 F..T= -- --T-R Ug $ U B- SE A MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH ,,. .'5100 3099.75 3018, q9 321:;0 3199,.'55 3118,09 350-G .... --3298.~59 ...... 321-7.53 - 3~00 3397-31 3316.05 3500 3q95,36 3~1q.10 ~700 3688,~9 3607,23 3800 3783- Oq 3701,7R ~O00 3966,59 3885-33 ~100 ~055.15 3973.89 ~300 ~223.89 qlf12.63 ~0 O q305.51 ~22~- 25 COURSE----- COURSE ...... DOG =-LEG INCLINATIEN gIRECTICN SEVERITY RECTANGULAR DEG MIN DEGREES DEG/IOO NORIH/SOUTH 3 57 k 69,26 W 2,32 3,78 S 6 5 k 59.qq W 2,29 ,Zq N _. 7 -56 ..... N-61o lq-W ....... 1.86 10 15 N 60.qq W 2,32 13.88 N 12 20 k 5~.I~ W 2.13 23.91 N .... 1 ~ --- 56 ...... N -55.~W 2-. 71 - -- 36,88- N 17 39 N 5~,32 W 2,70 53,07 N 20 20 N 52.56 W 2.7~ 72.A7 N .... 25--25 ........ ~-.26~ 5~09- _- 95.2 26 12 k 51.26 W 2.81 121.1 29 ~ N 51. 2 W P.~q 150.3 35 12 ~ 51, 2 W 2,55 35 23 ~ 52, 8 W ,6~ 253,9 ..... COORDINATES VERTICAL EAST/WEST SECTION 9,47 E '9,56 I ,68 E -1,~6 8-.-92--W ....... 1 £ '5--- 22,71 W 26.16 39,52 W 45,36 82,16 W 96,56 XOR.2R W 128,95 O-g ...... 15l.,-79 .~U-- ..... 9 N 170,73 W 207,96 2 N 206,88 W 25~+,31 6 N 289,90 W 8 N 335 o15 W q19.00 4600 qq65,27 qTOO qSq3,05 qq61 ~900 q695.69 q61A 5000 ~770,g2 q689 -~O.O ....... q~,56 .... q76q 5200 q918.51 q837 5300 q990,17 q908 5~00 ..... 506~.~2 550~ 5131,8~ 5050 5600 5202,27 5121 ...... 25700 ..... 52.7.2 ~$ ~- 5191 5800 53~2.67 5261 5900 5~12.62 5331 ~100 5552,85 5~7~ 2_.58_ __ 288 56,26 W 1,4q 323 56,26 W 1,07 358 N_.SG .-Lq __W ° ~. 2 .... Z 93 55.qq W .82 q30 5q,56 W .77 ~6~ ~~.q_.W -92 - _ - ~06 5~,56 W 1.~2 5~5 5~,56 W 1,12 586 _~ · q D ........ 627 5q.~O W .1~ 668 5q. 8 W .~9 710 ,16--- 752 · 20 793 · 26 b35 ...... ,_~5 ....... 877 · ~0 918 .90 N 3 82..~SD___W___ · 28 N q33,q2 W 53R,39 · 18 N A85,68 W 600,57 · q5 N 592,80 W 72.13 · 25 N 6q6,77 W 793,92 ,93 N 757,09 W ,37 N 813,91 W 997,17 ,95 N 92~,~1 W 1137,51 · 5~ N 985,95 W · 98 N 1101,3B W ~3~9,69 .78 N 1159.35 W ,R9 N 1275,22 W 1562,~6 ----S r HZO,--A L AS K.a, RE-TRCLE Y-6 PRUDHOE BAY ..... -~L-ASKA SPERRY-SUN WELL SURVEYING ANCHORAGE, ALASKA COKPUTATION DATE APRIL 2, 19a0 COivp/~Ky PAGE 3 DATE._OF S U R V EY _ MARC14__Z6 ,_ _1980 _ ~_ BOSS GYP. OSCOPIC SURVEY dOB NUMBER BOSS-16561 ....... KELLY- BUSH1 NG_ ELE¥-,.__m___B1,26_ FI.__ .................. TRUE ...... SUB-SEA PEASURED VERTICAL VERTICAL INCL DEPTH DEPTH DEPTH DE 6200 5622.68 5541.42 6300 5692,~6 5611.20 4 - &qO0 ..... 5762.3~ ..... 56~1. OA 6500 5832,23 5750.97 6600 5902.24 5820.98 -6-~0 0 ....... 547-2~5~+ ...... 589t~. 2-~ - 6800 6043, 17 5961,91 6900 6114.27 6033.01 4 7000 ..... 6186o02 -- 6104.76 - - -4 7100 6258.35 6177,09 7200 6331.29 6250. ' 730(I ...... 4~4 0~, $6 -- 6523. 7~+00 6477,10 6345, 7500 6549,z+1 6~68, 7700 6692.39 6611. 7800 6763.25 668,1. 8000 6905.31 6824.0~ 8100 6977.26 6R96.0~.~ q 8200 ...... '~050.-.26 ...... 6969.0 4 8300 7124.04 7642.7~ 84 .400 7198.59 7117.3 z4l ~7195. 7269.7 INATICN G ~ MIN CCUR SE ...... D O.G~ LEG DIRECTION SEVERITY DEGREES DEG/IOO 5 45 k 54,44 W 5 45 k 55,14 W 5 --~9 ..... k.-55.2G- W. 5 37 N 55. 2 W 5 30 N 55,26 W 5 --t-0 .... ~ - 54-, 50- W ~ 58 N 54,56 W ~ 24 N 5~. 2 W 3--- 54 ~-- N 53,44---W 3 ~7 K 53.1~ W TOTAL ................ RECTANGULAR COORDINATES VERTICAL NORTH/SOUTH EAST/WEST SECTION 2 42 42 8600 7350.98 . 8700 7427.46 7346.2 4 ........ -75. ...... 7 422 8900 7579,21 7~97.9~------J o000 7654 02 7572 7~ ""'"-4 · · r'"'- 9 ! O-O -----Z-~ 2-a .-l- 0 ..... -7-&-~ 9200 7802.11 7720.850 4 -- 4 -~ ...... N.- q :Ao58 -l,l ...... 4 30 N 47,20 W 3 28 N 46.50 W 2 .... 45'_ ..... JL_~5 .L9 W _ _ 2 10 N 44.32 W · 12 961].58 N · 50 1001,88 N · _11 .... 1042.76 N · 13 1083.65 N · 21 1124.46 N ........ -64 ..... 1-1 &5.~.37-- N · 20 1206,45 N .68 1247,49 N ...... ,64 -1288.69- N · 50 1329,97 N · 73 1371.31 N ..... .42 - -1412.98 N .59 1455.37 N · 61 1498.62 N ._. ,81- ._15~2, 92 -N · 71 1588,39 N 1.21 1635.28 N .23 ...... 1~82~99 N .28 1730,64 N 1.1n 1778.12 N 1.15 __1825,72 N · ~3 1873.65 N 1333,41 W 1633,59 1391,93 W 1704~_1 -1 ~ 5 O .~8___W_ ......1775 __=_ 1509.32 g 1846,65 1567.90 W 1917.49 1626 · 1683.73 W 2058.42 1740.83 W 2128.31 1852,34 W 2266.37 1906.84 k 233~,53 ....... 19 & O ._92.-_-linE. = =-2.A {3 ~ 6 O ~ 2014,88 a 2471-07 2068.73 W 2540.02 -.2122,51)--W ..... 2609,61-- 2175,95 W 2679.77 2228,67 W 2750-31 2332.2q W 2382,90 W 2960,51 2479.46 W 3096.20 25 k 42,55 W 1,qO 1922,03 N 2525,28 __6 ..... /~_. ~.,_2_W ....... 3.. 81 ......19E7,96_N ..... ~1_,/~I1. 3,57 2008,57 N 2621,37 · 76 2C46,39 N 2673.5~ · 92 .... 208_~. 62 N .... ~7~,9.~__W 2,00 2125,12 N- 2777,25 1.52 2168.35 N 2827.59 9 N ~6,58 W .75 2259.~9 N 292~,56 ~ 55 N 53,56 W 0 19 N 54,56 W 1 7 N 50.26 W 2 k ~8.44 W 3162.62 3 22Y_,_7_8__ 3291,94 3356,01 3428,52-- 3485.76 3552.09 3686.49 ...... $ OH-I-O-AL-ASK ~-P E-T ROLE L M COMPANY PRUDHOE BAY ~ ALA SJ(4~ SPERRY-SUN kELL oURVEYING COPP~r~Y PAGE ANCFORAGE~ ALASKA .............................. I~ATE_OF SURVEY MARCH_-2_6,--19RO CONPUTATIOh DATE EOSS GYROSCOPIC SURVEY APRIL 2, 1980 ,JOB NUMBER ROSS-16561 .- KELLY~ BUSH~J~G ~I.-E-~-:----R~o2G--F-I-~--- · - ........ T R LLE, ........... ~UB-SEA ....... COURSE__. MEASURED VERTICAL VERTICAL INCLINATICN DFPTH DEPTH DEPTH DEG MIN COURSE .... DOG-LEG ....... -TOTAL_ ~IRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEGREES DEG/IO0 NOR TIt/SOUTH EAST/WEST SECTION 9500 7876.33 77Y5.07 A2 1 h A5.32 W gAO0 7950.39 7869.13 /+2 25 h qq,49 W ~0 ..... 8~23.82 ....... 7qq2.56 ---q3 .... 5 ...... N _aS. lq. W °600 8096.37 801~.11 q3 5~ N q~.q~ W ~700 8168.57 8087.31 q3 39 ~ q2.~ W ........... 9-8-~ .......-8-2-4.-1-.-5;~>---~ 8-[-60.2 7 ........q~---~9---~qO~~ 9~00 R315,Gq 823q,38 Al ql N 37,~9 W 10000 8389.61 8308,35 q2 56 N ql,25 W °72 2305.97 N 297q.65 W 3753.~6 .69 2353.56 N 3022.08 W 3820.56 ._80- .....2qOl. 71 N ...... 50[~q-.92--W · 95 2q50.55 N 3118.ql W 3957.u5 1,37 2500.76 N 3165,99 W q026,D1 ~5- ~552.06 N- --~1~9--~--~~~~- 2.09 260~,30 N 325~,~2 W qlGO,19 2,82 2656,30 N ~2~6,02 W ~226,73 10200 8532.78 10300 8603.5P 10500 87q5,71 1 0600 8817.59 1-07-0 0 .... 88 9-0-.-7-7---- 88 09.51 I 0800 8965.2q 8883.98 10900 9OqO.q9 8959.23 -----2,~7~-.- -2, 707 · ~5 2757 1.~7 l .l~ .--2A62 .97 2916 2,97 2971 2 15 .... N-3q ..l 9.-W ........... 1~3-- 5g27 i 2fl N 3q. 2 W .79 3082 0 55 k ~3.25 U .75 3137 a 29 a365.92 A~q36.27 q, 575 o77 aGqq.03 .~. 7-3.-.0 ..5 _~ . ~775.10 4~838o91 11100 9192,70 9111.q/+ 11200 9269.86 9188 LI-~ O-O ...... -.uS q 7.88~ .... -9.26 G 11q00 9z~26.65 93~5 11500 9506.12 9q2q I 1643 9620.66 9539 .12 N 3755.9q W · Gq N 3788,70 W 502q./~ .88 N 3851.25 W 51~3.01 · 53 N 3881,~6 W 5200,69 ~q-_N .... 3896~25 W, - 5229.16 · 0~ N 3923.62 W 5281.89 HOR I-Z-0-N-T4 L-J21 SP-L-A C E-F-E N THE CALCULATION PROCECURES A B~::~,EE' Ol',i THE .-A.T--N OI~:I'H .~-q.7--- DE G. .... [ 8- - l. tl N .~--W ES-T- 4k-I.--MD- -=--L.1.-6 q~ USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD, SPERRY-~UN WELL SURVEYING COFPANY ANCHORAGE, ALASKA .... SO-HI-O--ALASKA .P-E-TRGLEUE CO~tPANY Y-6 CO~,PUTAT ION DATE P~UDHOE BAY APRIL 2~ .... AL~ ~A PAGE 5 LATE OF SURVEY MAILCH_26~,_].980. ,JOB NUMBER BOSS-16561 KELLY_ BLLSH:[NG_F_LEV-_- = 81_-26 FT_- ....... -INTLRP-OL-A-TE-D--V/tLLEg FOR-E.-~/£N--IO00 _FEET.. OF__~EASIJEED _DEPTH TRUE --P,E-A~~, U R E D, ~ E-R-T -! C A L .... DEPTH DEPTI- 1000 999,98 2000 1999.95 SUB-SEA TOTAL V E-R T -I CA L ---- R F C.T-A N-G-LLJLR--COCR DZN-A Z~S ...... P.E_-_T VD .......... VE Rl'_[C AL DEPTH NCPTH/SOUTH EAST/k~EST EIFFEPENCL CORRECTION -~1,26- ......... O-oDD 918.72 1,/+2 S 1918,69 6.17 S .0,.00 ....... O,OO ........... 5, 08 E · 02 ,02 9,9lq E ,05 ,03 3000 ....... 299-9.8R------ 2918..-6-2 ........ 5 4000 3966.59 3885.33 121 5000 ~770.92 q689,66 q68 G§O0 .... 5x~ P--..-7-2 .... 5~1-,~6 ...... 877 7000 6186.02 610~.76 12RR 8000 6905.31 682~.05 1730 ~0000 R389.61 830~.35 2656 11000 9116.31 ' ~ 9035.05 3192 ~16~ .... 962~+6~ .... A539.40--~ 3536 · . 5-.:3- S .......... 1 ~,.01 --E ........ ol-2- ............ o19 h 170,7~ ~ ~o~+I 35,29 · 25 N 64}6.77 W 229.0R 195.68 .35-N ...... 1217,30 la- ....... 517.,28 ....... 288-2.0- · 69 N 1796, 98 W 813.98 296.70 ,6~+ ~ 2332,2~ ~/ 109'~,69 280.71 o :35-- N ...... 282-7-.-5 9- id .......... 1-,345 °-98 ......... 253.° ~_ 9 .30 N 3296,02 td 1610,39 26~.~1 · ~1 k 37Pl, 73 W 1883,/:,9 273,30 , O-q--- -.~ ...... -Z~5 2 ~. 62 W .......... 2D 22~.q .......... 138,-~ ~. ---- THE CALCULATIO~ PRC£EDURES AR~>DASED 0 O0 --hZ ,mmmmmm . N THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD, gCHIO ALASKA-PEIROLELM COMPANY Y-G PRUDHOE BAY .... ~bA-~4A ...... SPERRY-SUN 6ELL SURVEYING COMPAD'¥ ANCHORAGEe ALASKA COD~PUTATION DATE APRIL 2~ 1980 PAGE G. -DATE OF SURVEY MARCH 26,~ 19.80 dOB NUMBER BOSS-16561 KILLY- BUSHt-NG -gL-F:-V-,---- --84-~-F-T-,--- ............... JKT-ERPOLATED VALUE$-FCR-E-VEN 1~t~ FEET OF-£UP.--.SEA- DEPTH TRUE SUB-SEA TOTAL --Y E-ASURE-D ...... -VER-T t C AL----- VERT I C-AL- ---RE CTAN GULAR- ----F~ ORD INA T ES--- DEPTH DEPTH DEPTH NORTH/SCUTH EAST/WEST F~D-"--TV-D - -- - DIFFERENCE 0 0-. 00 ......... At o2 6 81 81,26 O. O0 .02 181 181,26 100.00 .00 381 381.26 300,00 .29 S ~81 ~81,26 ~DOeO0 .71 S 5~--~5~-1-., 26 .......... 50C.00 681 681.26 600.00 1-01 S 781 781,26 7DO,SO 1.0~ S ~ 861..26 ..... 80-0. O0 981 981,26 .__. 960,00 1-32 S 1081 1081,26 1000.00 1,P5 S 1181 ........11R1,2G ..... 1ADD. DO [1. QO ......... Oo 0 0 · 12 E · 51 E l.~ 0-1- E- 1.65 E 2,2~ E .01 2,-66--~-£ ................. · 01 3,32 E .01 3,89 E · O1 5, 0~' E , 02 5.28 E ,02 5 ,.GY_._E 6.28 E 6.84 E 7.98 E . DA 8. ~2 E .04 ~o-8 L- E ~o O-q 1281 1281.26 1260 1381 1381,26 1300 1 ~ 81- ~--4-q81~2 6 ..... 14 O 0 1581 1581.2G 1 500 1681 1681,26 1620 1-781~ -- --1181 · 2&---- ~l 7-00 D0 ~ 3.20 . · 00 ~ '~.07 .00 t,'rl ~ 5.11 .00 ~3'-'5,55 ~5.71-_s _ V E RT-I-C-Ak, CORRECTION .00 .00 - -- .00 ,00 .......... .OD .00 ...... o00 .00 .00 .00 .01 o0-0 .00 o00 SPERRY-SUN WELL SURVEY)NG ANCHORAGE~ ALASKA ----$6 H tO--A L A S K A-P- E-TR OLELF-C OF, P A N Y Y-6 CONPUTATION DATE PRUDHOE BAY APRIL 2~ 1980 ~L~-SK A COPP AI~Y PAGE 7 .DA TE_OF _SURVEY. H_AR£H__2G.,__~ AG dOB NUMBER BOSS-16561 --KELLY BUSHING.-ELE-V-~- 8_1_-2G FT- --t-k T E' R P OL-A T-ED--V ,~-L UES -F-OR--E-V E N--t-0%--FE-E-T- -0 F-- -SU [~--S E-A-DE P TH TRUE SUB-SE ----t'zE'-A-,C, -%q%E-D-- -----VE-R-T--I-G-A-L---- V E tzT I C A DEPTH DEPTH DEPTH 1-881 .......]-gg~-, 26-- 1 800..4)0 1981 1981.26 1900,00 2081 2081.26 2DOC.O0 2 ~8-t-------2-t-8-t-,.;~ ~------2 2281 2281.26 221~0.00 2381 ?.381.26 2:300.00 2 A-P,-1 ......... 2 ~+8-1--2 6 ..... 2 4 O.O 2581 2581.26 2500,00 2681 2681.26 2600.00 .2~1-----q2-781-- 2-6 ....... 2700.. bO 2881 2881.26 2800.00 2981 2981.26 2900.00 TCTAL --R-ECT AN-GU L AR ....COOP, ID- I-NAT F~--l" I:L-J V D NORTH/SOUTH EAST/WEST DIFFERENCE V£ RTI CAL CORRECTION 5.9-~%-- $ 9.25 g .0-4 ............. 6.15 S 9,,85 E -0~+ .00 6,23 S 10.58 E .05 .00 &.-:t-7---S 1--1-~-~ 0--E ---- =-0-5 -- 6,,05 S ll.6q E .05 .00 5.71 S 12.01 E .0G .00 -q, P,&--S ........ .1-3~ -07 --E-- .......... .0--7 ................ ,,01--- A.29 S 13.75 E .07 .00 3.68 S 14.70 E .08 .01 5,2& S 15.37 E .69 .01 5.72 S lq.51 E .11 .02 :3~l.8,-1 - ---.50 P>-I-. 2 6------~ O00-.-0..0. ............. 4 ~-2a.. -S- 3181 3181.26 3100.00 .P4 $ 3282 3281.26 :3200.00 ~ 5.00 N 338-,3- .....$~8i-~26- 35 OO-.-O-O ..... ~ Z2,q5--N. :.3485 3~+81.26 3400.00 22.28 N 3588 35R1.26 3500.00 ~ K-55.21 N -hZ lO.-&6- E ......... ,,21 ..... 3.3q E · 55 6.81 W 1.25 .... 2Q.l_B__W ............... 2.~-~5 .... 56.7P W 7.09 P_O ._32. _ W ........._1.1,16 ...... __ ..1. O .70 ! o18 1.88 2.78 . .~_. 07 --.--~CH]-O--~LJ~S K A- P EIR OL ELY Y-6 PPUDHOE BAY ...... A L-ASF~A ............... COMPAN-¥ SPERRY-SUN WELL SURVEYING COMPANY PAGE 8 ~NCHORAGE9 ALASKA " ...................... .DA.TE OF .SURVEY MARCH 26~, 1.980-- COPPUTATION DATE APRIL 29 1980 UOB NUMBER BOSS-1GSG! -KE LI,.-~--BUSHI-NG--E I.E-V+-:--~-,t o 2,-G-£ T = t-N.I-ER-P--0 L A-T.F.~-N AL L E.~- F 0 E_ E V E N - i-00 _F E F._T __,OF----S U E -_S.E~ -O 5-P-T H TRUE SUB-SE ..... PJE-ASURE D ....... VE4~- I.~ A-L---VE R T-I C A DEPTH DEPTH DEPTH A TOTAL L ....R ECT ~-N G ULA R--- CO ORD INA-T ES ..... ND NCRTH/SOUTH EAST/WEST DIFFERENCE V£ P,J I-C AL-- CORRECTION 3905 3881 q016 .'3981 q2~+8 ~181 4370 ~281 ....... a..~ 9.3_- .... q~l q62 0 '4481 5013 A781 52a7 .... 5~28 5081 5570 5181 5712 ........ _.52 a 1 5855 5381 5997 5~81 ._AL~_O .... ~55.81 · .26 ..... 3700°-00 · 26 3800.00 .26 3900.00 .2~ .......~000.00 ,26 · 26 ~200.00 ,2~ q3QO.O0 .26 ~00.00 · 26 q500.O0 · 26 qTO0.O0 · 26 qSO0,O0 · 2&_ .... ~gOO~OO .26 5000.00 · 26 5100.00 .26-- 5200.-00 °26 5~00.00 · 26 5qO0.O0 · 26 ....... 5500.~0 .... 72.~8 k ...... 107.7£ W 16.8A ......... 5.Ga---- 96.67 N 139.67 W 2~,67 7.R~ 125.76 N 176,43 W ZS,I) 10,q6 .... 15-9.71 -N -----~8~q5- W ........... ~81 ...... 13.G8 199,33 h 266.80 W ~6.75 17,9A 2~3,q0 N 321,56 W 88.99 22.2~ .... 2gG.19 ~ N ~19, 7~..~ ....... 112~8 .25.59 330,32 N ~q3.96 W 1~9,1~' 26,57 375.71 A' 511.91 W 168,29 29.1~ ..... ~.2~ 3q N ........ ~a~ A~ q73.55 N 65~,21 W 232,5~ 32.92 525,A5 N 728,25 W 267.37 3~,82  639.36 N 887.~7 W 347.26 41,07 698.01 N 968,65 W 3P8.76 ~1,52 ~ ~ 817-03 h 1133.25 0 876.49 h 1216-10 ~Z~73 __.--SOH-IO --AL ASK~A_P-F..3 R OL£ tM- COMP AN ¥- Y-6 PR LIDHOE BAY -----A L A SX-A-- SPERRY-SUN WELL SURVEYING COFPANY ANCHORAGE, ALASKA COFPUTATIO& DATE APRIL 2,~ lgRo PAGE gATE OF .SURVEY_MARCH- 2G,__1980 ,JOB NUMBER BOSS-16561 _._KELL¥._BUSHING- E.I~_,-_=~ RI_,2G_ FT. ............ _I.NT~RPOLAT.EC-VALLES FOR-F_.VEN IOCL_FEET_QE--SU~-S-EA DEPTH ....... TRUE SUB-SE ~-M E~-~ UR g D-----VER-T-I C A L~V-E ~ [-CA DEPTH DEPTH DEPTH A TOTAL ' L ....gE CT_AN GCLAR NCRTH/SOUTH EAST/WEST DIFFERENCE ........ 6293 ..... 5681 °26 ~427 57~1,26 5700,00 6570 5881,26 5800,00 6.7-1-2- ........ ,598&-.-2 6853 6081,26 6000,00 6~93 6181,26 6100,00 7268 6381.26 6300.00 ...... 995 ,.3i 1053.~3 N 1466, 61 W 1112.29 N 1550,36 W ...... 117 O .-_q-G--N .... 1228-~9 N 1714,62 W 1285.97 N 1793,30 W 1399.68 h 19~3-7~ W WE R T_I C AL CORRECTION 602.69 .......... q5.30 6q5.86 43.17 688.81~ A2.9~ _ _731 .il_. ._q~&O 772.51 41,q 0 812.13 39,62~ _850.5~ ........... 38 .~ 887.03 36,73 6~81,26 7A05 --7-5~A-- .&S&l-,.2 & .......... G 5-50o-~ O-- ...... i 51 7684 6681.26 6600,00 158 7825 6781,26 6700,00 164 171 6q, O0.O0 1457.83 N 2017.97 W 92q.q, 7 $7.~5 7.97_N .... __2Q!i2..GQ_W- - __ 962_,_5iS .......... _58,52 qO,O7 796-6- .... 68A3.,2X~---- 680-0.. £0 - 8105 6981.26 6900.09(.~ R2q2 7081.26 7000.00~ ~76 .... -7-1-81+26 ...... 71~0~ - - 8509 7281,26 7200,00~- ' ~ 8639 7381,26 7300.00~ ~ ..... 8-77 O ..... 1~8~ - 2~-- lA O C · O 0 ~ 2385, 65 W 2~+52,2q W __253.. q · 9..q-. W ..... 2575, 95 W 1,18 N 2167,59 W 1003,07 7,43 N 2241, 95 W 1C4~,20 4 .S& .{~ ....___2_31_~. 9_O__W ...... ~~..03 I 12~. 25 1160,9~ 1227,75 1258,21 1289 ,~ 8 1780.73 N 18~+ 5,91 N 191 O 1971,80 N 202,3-62 N 26~1, 75 2.~ 7 ~,._1...9_. N-----...2- 71 q1,13 39,23 36,69 32,15 30.~6 ~-SOHI-O-AL-ASK-A- PE-TEOLEU~- CCMPANY ..... Y-6 PRUDHOE BAY SPERRY-SUN I. ELL SURVEYING AN£HGRAGE~ ALASKA COMPUIATIOk DATE APRIL 2,~ 1980 COFPANY PAGE 10 .DATE* OF SURVEY-MARCH-2Ge--*lgP, O dOB NUMBER B0SS-16561 KE L-L Y--BUSH~I N~--F.-L-E-V - a~l+~l-6--F. T = -Z ~T E R P. OLA_.IiE.D__VJU. JJ ES _F 0 E-[ VE~_~_EEE. I. _ Q F__S U R_-_$F_~ E P T H · TRUE SUB-SEA TOTAL M.E~£D__- -~F~[IC AL___ VF~ ZI C. AL_.__}!E CTAN G ULA R___ C~O [LED IN A_T ES.-- ..... DEPTH DEPTP DEPTH NCRTH/SOUTH EAST/WEST DIFFEPENCE 8_902 ...... 75 81o2_6__.__ 75 DD,-O0 9056 7681,26 7600,00 9171 7781,26 7700,00 9,3 O 6--~788~1.26 96~1 7981,26 7900,00 9579 8081.26 9-717 .... 8,1~. 2 ~ ...... R ~0 ~~ ...... 9R53 8281,26 8200, O0 ~988 8381.26 8300.00 10268 8581,2G 8500,00 10~09 86~1,26 8600,00 ~0687 888[.26 8800.00 ¥£R_.TZCAL CORRECT ION 2126,2& _h~ ...... 2_77 8,_62__W .... 2184,64 N 2fl~5,96 W 2246,27 N 2912,90 W - 2~-09 oOg---N ........ 2573,68 N 3041,~G W 2A40.17 N 3108,23 W 25 09 ,~ ~-N--~ i~-A ~1-7- W ......... 2580,01 N 323~,57 W 1 497, 77 37 / 1536 o2 7 1572,65 36,$8 2650.45 .... -272 2792.6~+ 2867,20 .... 29A.I 3020.~- 34,71 ~1,20 ~+0,99 37,5~ 10821 8981,26 8900,00~ 309q,57 h 3657,75 W 1840,11 ! 0952.%---,- _90 81+2 6------.,-90,~0 .-?-?:~ ..... J 1 g7 ~-~ .... ~-~& -~ -- -~87 11085 9181.26 9100,00~ 3238,96 N 3750.95 W 1903,83 1121~ 9281,26 9200,00~~ 3309,62 N 3793,~0 W 19~3,~3 ~3~2 ........... 95~.2~ - -9.300 ~D.O00 5378.4~_N ...... 383~,56 .W_ . 1 34,22 5,?.-o5 3 - 31,18 29.60 $OHIO-/~L/~SKA PF.._TROLEUM COMPANY PRUDHOE BAY ..... ~-L-A $-K A- SPERRY-SUN ~,ELE SURVEYING COMPAkY ANCHORAGE, ALASKA COMPUTATION DATE ~PRIL 2,~ 1980 DATE OF SURVEY PAGE MARCH_26,_ 1980__~ JOB NUMBER BOSS-16561 KELLY BUSHING.-ELE-V-~ ~.= ~ 81~.2~__FT,___ INTERPOLATED TRUE SUB-SEA ..... ME-A-SURED ..... VERT-ICAL ~ -VERTLCAL DEPTH DEPTH DEPTH ¥ALUES FOR E.VEN lDO FEET OF_SUB-_SEA-DEPTH-- TOTAL RECTANGULAR--- COOR.D :I~L~k.~ £S ...... M.D.-.T V D ........ .VERT[CAL_ NCRTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 1 1468 ........ 9481.2& ....... 9400oQ-0_ 11593 9581.26 9500.00 11643 9620.66 95.'59.40 THE CALCULATION PRCCEDURES USE A THE NEAREST 20 FOOT MD (FROF ~ADIUS _ ~445,.22 N ........ 5872_.21_W .... 19&7.6 O .... 26_.32 3510,46 N 3909,15 W 2612,58 2~,98 3536.04 k 3923.62 W 2022.3~ 9.75 LINEAR INTERFOLATION EETWEEI~ OF CUR¥ATURE} FOINTS SOHIO ALASKA PETROLEUM COMPANY April 2, 1980 Alaska Oil & Gas Conservation Cc~m%ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hsmilton ~Fi RE3 ENG 3111 "C" STR ANCHORAGE, ~~ TELEPHONE {O07}'~~r 1 ANCHORAGE, ALA~9,0g FO __I. 2 ~,~~ J ST~,TTEC 1 CONFER: FILF: .. Gentl~uen: Well Y-6 (23-28-11-13) Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-namedwell for the monthofMarch, 1980. AMR:ja Enclosures cc: Well File #17 Yours very truly, Austin Reid Acting District Drilling Engineer Form N~ !~0-404 ( SUBMIT IN DUPLICATE "I~,EV 3-1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. AP! NUMERICAL CODE 50-029-20431 6. LEASE DESIGNATION AND SERIAL NO ADL 28287 OiL [] GAS [] 2. NAME OF OPERATOR 8, UNIT FARM OR LEASE NAME Sohio Alaska Petroleum Ccmpany Prudhoe Bay Unit 3 ADDRESS OF OPERATOR 9. WELL NO. Pouch 6-612, Anchoraqe, Alaska 99502 Y-6 (23-28-11-13) 4. LOCATION OF WELL At surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 10 FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC. T. R M (BOTTOM HOLE OBJECTIVE) Sec. 28, TllN, R13E, UPM 12. PERMIT NO. 80-02 13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. March, 1980 Directionally drilled 8 1/2" hole to 11643'. Ran openhole logs. Ran 42 jts. 7" 29# L-80 Buttress casing to 11637'. C~ntedwith 460 cu.ft. Class G c~aent. Cleaned out to 11593', tested casing to 3000 psi. Changed well over to NaC1, ran CBL. Ran 316 jts. 4 1/2" 12.75# L-80 CS Hydril tubing to 10019'. Landed tub'..ln~withball valve at 2027'. Installed and tested tree. Displaced tub~ to diese . Set packer at 9912', tested tubing to 3500 psi. Released rig at 1330 hours, 3/12/80. EFW:ja 14. I hereby certify that the forego, nm,.s true and correct ActJ_ng n~ SIGNED NOTE--Report on th~s {orm ~s reqmred for each calendar month, re§ardless of the status of operations, and must be filed in duphcate with the oil and gas conservation committee I~y the 15th of the succeeding month,unless otherwise directed. SOHIO ALASKA PETROLEUM COMPANY March 7, 1980 __/ ~-~ ,~,~-- TELEPHONE (907)~_~0-~- -M ANCHORAGE, ALASkA_99~'''r' _~ ~ CONFER ; FI LF: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 Attn: Mr. H. Hamilton Re: Well Y-6 (23-28-11-13) Gentlemen: Enclosed please find, in duplicate, Form 10-404, Monthly Report of Drilling and Workover Operations, for the above-referenced well. Very truly yours, SOHIO ALASKA PETROLSIE~ COMPANY ~. M. Reid Acting District Drilling Engineer Enclosure CC: S. Bundy A. E. Leske Drilling File Form No 10-404 REV 3'-1-70 (' SUBMIT IN DUPLICATE STAT E 0 F A LAS KA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50.-02.9.-20.431 6. LEASE DESIGNATION AND SERIAL NO. ADL 28287 OiL [] GAS [] 2. NAME OF OPERATOR Sohio Alaska Petroleum Ccm~any 3. ADDRESS OF OPERATOR Pouch 6-612, Anchoraqe, AK 99502 4. LOCATION OF WELL At surface: 1318' SNL, 5055' WEL, Sec. 34, TllN, R13E, UPM 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. y-6 (23-28-11.~13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11 SEC T. R M. (BOTTOM HOLE OBSECT[VE) Sec. 28, TllN, R13E, UPM 12 PERMIT NO 80-2 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS February, 1980 S~_d well at 0515 hours, February 2, 1980. Drilled 17 1/2" hole to 2715'. Ran 69 jts. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 3854 cu. ft Permafrost cexflent. Installed and tested BOPE. Cleaned out to 2647 ft; tested casing to 3000 psi. Drilled out shoe, ran leak-off test. Directionally drilled 12 1/4" hole to 10474'. Ran open hole logs. Ran 268 jts. 9 5/8" 47# L-80 Bu%tress casing to 10467'. Cemented in two stages: First stage with 1518 cu. ft. Class G cement; second stage through D.V. Packer at 2596' with 130 cu. ft. Permafrost cement preceded by Arctic Pack. Cleaned out to 10467', tested casing to 3000 psi. Drilled out to 10497', performed formation cc~petency test. Directionally drilled 8 1/2" hole to 10667'. 14. I hereby certify that the forel~,,ng g truce, and correct ~Act~i/3g Di_strict SIGNED ~_~. jVC. ~ ~ TITLE urillLng ~ngineer DATE ~/~.~/~O NOTE-Report on this form ,s required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation corem,tree by the 15th of the succeeding month.unless otherwmse directed. Alaska 0il and Gas Conservation C_~wm~ssion Ho¥1e H. Hamil~~o ChaLrman of the n Lonn~e C. Smith ~ss[oner ~byD. Fo st~~ Pe~ole~ February 7, 1980 Witness DOPE test on SOHIO e s Y-6 Sec. 34, TllN, l~3E, UM Permit #80-2 .Tu..esday.~. Feb .rUa..ry 5, 1980 I traveled to PrudhOe Bay this date after Mr. Dick Maskell, SOHIO drilling foreman contacted me concerning the upcoming DOPE test on The BOPE test ~ at 6t30 ~ ~d ws ~o~uded at 11~30 ~. The re~lts of ~e test are attach~ to ~is re,rt. In ~~ I wi~essed ~e ~PE test on,'~HIO~s ~ ~e cho~ ~ifol~ ~d ~e up~r Mly valve had ~en re~r~ test~ ~ SO00 ps~g. o , · / ~_ January 3, X980 Re: Prudhoe Bay Unit Y-6 (23-28-11-13) Sohio Petroleum Company Permit No, 80-2 Stir. Loc. I 1318t SNL & $055t WEL, Sec. 34, TllN, R13E, UPM. Bottosdlole Loc.: 1850' NSL & 1880' E~.., Sec. 28, TIlN, It13B, UPH. Hr. P. R. Judd District Drill/no Engineer Sohio Pet~ole~u Company ~ou~ 6- 612 A~Orage, Ala~a 99502 Dear Hr. Judd: gnclosed is the approved application foe permit to drill the above re£erenced yell. Well sam. pies, core chips and a mud lo9 are not required. A directional survey is required. If available, a tape contain- ing the digitts, ed log information on all logs shall be submitted £or copying except experimental logs, velocity surveys and dip~eter surveys, Many rivers in_Alaska and their .drainage systems have been classified aa important for the spawning or migration of anad~omous fish. Operations in these areas are sub,jeer to AS 16.50.870 Lnd the regulations pr~lgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations yOU may be contacted by the Habitat Coordinator's office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to Hr. Po R. Judd -2 P,B.U, ¥-6 ~ranuary 3, 1980 oommencing operations you may be con~acted by a representative of the Department of Environmental Conservation, Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department o£ Labor is being notified of the issuance of this permit to drill. To aid us in schedulinq field work, we would appreciate your notifying th~s office within 48 hours after the well ko spudded. We would also like to be notlf~ed so that a representative of the c~u~tssion may be present to w~tness testing' of blowout preventer equipment before surface casing shoe Ls drilled. Xn the event of suspension or abandonment, please give this office adequate advance notification so that we nay have a Withes s present. Very truly yOUrS, Hoyle H. Ham~Iton Ch&.irman of BY ORDE. R OF THE Alaska Otl & Gas Conservation Coma/ss/on / Enclosure cc~ Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o/encl. Department of Labor~ Supervisor, Labor Law Compliance Division w/o encl. SOHIO PETROLEUM COMPANY Division of Sohi~ Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION Alaska Oil and Gas Conservation Cc~ssion 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Gentlemen: Mr. Hoyle H. Hamilton Well Y-6 (23-28-11-13) 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 a, NCHORAGE, ALASKA 99502 Enclosed are the follc~ing documents: 1. Application for Permit to Drill, in triplicate 2. Proposed Drilling Program Outline 3. Our check for $100.00 to cover the permit filing fee. 4. Three copies of surveyor's plat showing well location. Very truly yours, SOHIO PETRO~ COMPANY P. R. Judd District Drilling Engineer PRJ: ja Enclosures cc: Well File #17 Form 10-401 SUBMIT IN TRI TE REV, 1-1-71 (Other lnst~uctlB on la. TYPE OF WORK STATE OF ALASKA reverse s~de) OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DRILL I~ DEEPEN I-'] b. TYPE OF WELL OIL ~ GAS SINGLE MULTIPLE F-='i WELL WELL O OTHER ZONE [~ ZONE | ! 2. NAME OF OPERATOR Sohio ?otroleum O:mpany, Div. of Sohio Natural l~soureos Co. 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL At surface 1318' SNL, 5055' ~EL, Sec. 34, TllN, R13E, UPM At proposed prod zone 1850' NSL, 1880' EWL, Sec. 28, TllN, R13E, UPM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 10 miles NW of Deadhorse API #50-029-20431 LEASE DESIGNATION AND SERIAL NO ADL 28287 7 IF INDIAN, ALLOTFEE OR TRIBE NAME 8 UNIT FARM OR LEASE NAME Prudhc~ Bay Unit 9 WELL NO Y-6 (23-28-11-13) 10 FIELD AND POOL, OR WILDCAT Prudhoe Bay,Prudhoe Oil Pool 11 SEC., T, R., M, (BOTTOM HOLE OBJECTIVE) Sec. 28, TllN, R13E, UPM 12 14. BOND INFORMATION ~E Blanket Surety and/or No American Insur~ 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest drlg, umt, ff any) 1880' east of ADL 28288 DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT 2664' west of Well Y-4 21 ELEVATIONS (Show whether DF, RT, CR, etc.) est. KBE = 81' AMSL Ace Co. 3348616 16 No OF ACRES IN LEASE 2560 19 PROPOSED DEPTH 11679'MD 9647'TVD 17. NO.ACRES ASSIGNED TO THIS WELL 160 20 ROTARY OR CABLE TOOLS 22 APPROX DATE WORK WILL START January 10, 1980 23 PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER F~T GRADE ]V~ SETTING DEPTH~T~~ Quantity of cement 36" 20"x30" Insulated Cor~uctor 110' 110' 8.0 cu.vd. 17~" 13 3/8" 72# L-80 2700' 2700' 5000 ml.f~_ P~f~n~ TT 12~" 9 5/8" 47# L-80 10469' 8754' 1736 cu.ft. Class G;130 cu. ft. 8~" 7" 29# L-80 11679' 9647' 320 cu.ft. Class G PFC See attached proposed drilling program outline. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal 15 to deepen g~ve data on present productive zone and proposed new productive zone. If proposal ~s to drdl or deepen chrect~onally, g~ve pertinent data on subsurface locations and measured and true vertwal depths. G~ve blowout preventer program. 24. I hereby cemfy that th~ Foregoing is Tree and Correct District TITLE Drillinq Enqineer (Tins space for State office use) SAMPLES AND CORE CHIPS REQUIRED []yEs ~o DIRECTIONAL SURVEY REQUIRED [] NO CONDITIONS OF APPROVAL, IF ANY MUD LOG [] YES ~O OTHER REQUIREMENTS A.P.I. NUMERICAL CODE APPROVAL DATE PERMIT NO. - "7-'t "~//~ ~ O -"%-- DATE '-01/03/80 APPOVED BY _ . . TITLE Chairman BY OR~,ER Or~bl ~ ~ ~ ~ See Instruction On Reverse Side = CO~%~tSS~ON PROPOSED DRTT.I.ING & C(1MPLETION PRE~4~M Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated conductor to surface using concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 5000 cu. ft. Penmafrost II cement. Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Directionally drill 12 1/4" hole to 8754'+ TVD. Run 9 5/8" 47# L-80 Buttress casing to 8754' TVD and cement first stag~ with 1735 cu. ft. cement. Cement second stage through D.V. packer collar at 2600'+ with 130 cu.ft. Permafrost C cement. 9 5/8" casing will be h~ at surface, ~he 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D. at 9647'+ TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 320 cu. ft. Crass G cement with 18% salt. Run 4 1/2" 12.75~ L-80 CS Hydril tubing with 5 gas lift mandrels and a pro- duction packer assembly at 8348'+ TVD. A subsurface safety valve with dual control lines will be placed at 2000'+. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be sutmLitted on Sundry Notice to follow. OZ 04. O! 02 04 20 30 I BSO' ¥ - 6 28 .~I[Pr°p°~ed) PORTION OF SCALE -q Tll N, RlaE, UM I": I/2 MILE T. IlN T. I0 N · CCNOUCTOF~ HCL~S CERTIFICATE OF SURVEYOR i hereby certify that lam properly registered to p:acti^e land surveying in the State of Alaska and that this plat represents a location survey of the wellpad sho,,n and Che wells thereon. This survey was made by me or under my supervision and oil dimensions and other details are correct. Bottom hole locations are furnished by others. Date Surveyor NOT--_ (ZZ-27'-11-I$ ] l' 14-27-11-1.~ ) SUMP o Plat doted Aug. 30, '-279 chc,"gad to 0:' 2, 19-'9. B~ttom ~'::e Io':.I, SB 6 r F.p c C.J.R PAD "Y': LocateJ in Surveyed for SOHIO PETROLEUM, CO. ~ ,-,,,~,..,.--~- ~'-"'"--- ,.>, S~-ve~e~ by misstl~.M. LINDSEY E ASSOC. LAb~ ~, HYDRCGRAPHIC SURVEYORS Box 4-C~l C~ECK LIST FOR NEW ~L PERMITS Is the ~ermit fee attached .......................................... Is %~11 to be located in a defined pool ............................. 3. Is a registered survey plat attached ................................ e Company Yes No Is ~11 located proper distance frcm property line .................. ~,,~ Is well located proper distance frcm other wells .................... ~ sufficient unde~icated acreage available in this pool ..... ) well to be deviated ................................... ~ operator the only affected party ................................. Can permit be approved before ten-day wait .......................... Does ~operator have a bond in force .................................. Is a conservation order needed ...................................... ?. Is administrative approval needed ................................... 3. Is conductor string provided ........................................ · !~ enough cement used to circulate on conductor and surface ......... ~__ '°~1 c~nent tie in surface and intermediate or production strings ... ~ ' }1 cement cover all known productive horizons ..................... ~ ¥~ill surface casing protect fresh water zones ....................... ~ Will all casing give adequate safety in collapse, tension and barst.. ~ Remarks Does BOPE have sufficient pressure rating - Test to ~dg~(> psig .. ~ Approval Reccmmended: Item Approve Date (1) Fee ~"~ ! / (2) I~x~. ~~ -]ditional Requirements: Engin~er..ing: rev: 12112/79 Well Histocy File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. 11 000000 7777777777 000000 11 OOOO00 7777777777 000000 1111 00 O0 77 00 00 1111 00 00 77 O0 00 II 00 0000 77 00 0000 11 00 OOOO 77 00 O000 11 O0 U0 O0 77 O0 O0 00 ll O0 OU O0 77 O0 00 O0 11 0000 OU 77 0000 00 11 0000 O0 77 0000 00 11 O0 O0 77 O0 O0 11 O0 00 77 O0 O0 11111! 000000 77 000000 111111 000000 77 000000 7177777777 7777777777 77 71 77 77 77 '17 77 77 77 77 7; 77 bbbbbb 000000 333333 333333 066o6o 000000 333333 333333 o6 O0 O0 33 33 33 33 66 O0 O0 33 33 33 33 66 00 0000 33 ~3 66 O0 0000 33 33 66066066 00 00 O0 33 33 00060006 O0 O0 O0 33 33 ~ 60 0000 O0 33 33 66 06 0000 O0 33 33 66 66 O0 O0 33 33 3J 33 h6 oo O0 O0 33 33 33 33 ~0oob~ 000~00 333333 33~33 606o0~ 000000 333333 333333 666666 666660 66 06 60 66 06066660 66660606 66 06 66 66 66 Ob 66 66 666666 666066 ,$TAF~I* U,SEI~ PCAL 110707,00.~36] d£}8 SHiP SE(~. 765] DAlk, 12-dUN-.80 22:31:23 MUNITCJR ~b kG10~_,37 APk-~O. *START* *START* U$~I~ PCab t107ol,60336] dOB 8HIP 8gU. 7053 I)ATk 12-dUN-80 22:31:23 MUNII't~R oW$ KL10k37 AP[~-80. *STARI'* 11iiii IlllIl ii 11 1I 1I Ii II I1 II I1 1II111 1iiii1 ~F YY YY YY YY 0000o0 0000o0 666666 000oo0 ouOOOu 66666b Ou QO O0 O0 bb O0 UO (;O O0 Ob O0 0000 O0 O00O 66 00 0Or)0 O0 OOOO bb O0 O0 O0 O0 O0 O0 b6666666 O0 O0 OO O0 O0 UO bb666666 0000 O0 0000 00 66 66 0000 O0 0000 00 66 66 O0 O0 O0 O0 6o bO OO O0 O0 O0 06 66 000000 o00000 606666 000000 OOO000 666666 MU~JTU[4 bwb ~Llf)kJ7 APR-uO. *START* f16~: DSNH:VERI~.O0~<O5Z>[10107 bOJ3bj C~AI'kO: (JUEUf Sw ~ I'CHES: /f li, f. :FURT /SPACING:I /LIMI'I:84 /FURMS:NOhMAL 7653 OA£5 12-dUN-80 12-dUN-80 22:24:51 22:31:23 SCHLUMBERGER CUMPUTiNG CENT~,R 10'707.60336 i,r_,hiG"l'n: 132 bYTES RgP_, b NA~IE: P.C.A.J,. RLkL CONT1NUATI~JN NUMbeR: O~ Ci}~M~N1S: LI6 ~U~MAT CU3TUtqER I'AFi:, DALE: 80/ 6/12 l,kNGl'it: 132 [APL NAMk: bO)3b DATE: 80/ 6/12 ~APk Ct. JNI'INUATLL}I~ N[JM~E~: 01 PREVIUU6 1AP~ NAME: CflMMLNIS: qAPB CU~MEN'I5 CASING D~IL&E~ 9.~258104O7/BIT SIZ5 8.5/FLUID TYPE ~GM/ DkN6 9.9/VlSC 45/PH 9/~LUID lOSS 5.8 Mb/BM 2.55~58 N~IF 2.25[a58 ~/~MC 2.8/58 F/MAX RBC TMP 192 ~/ TAKEN ~i{OM RUN~2 OIL LUGGED 4~AR80 ~'lk~(;kD wi'lB b0335(DIL) FILE bkNGfn: b2 BYTES F1. L?. NAt~B: EDtT .001 MAXII'~UM PHXSICAb BECURD LENGTH: FREV ,~ [jLl~ FILE NAME: 102~ BiTg8 WkLl, 51'Ii C[IMPAN WELL: F i [",I,D HANG,%,: [~JWN: ~ECT l ('(iii N t ] NP [JHHATILIN 177 B~TbS RkCORD SOHIO ALASsA PETHU. PRUDHGE BA~ lin N. SLOPE ALASKA CO. DA[A ~U~MAJ' SP~CIFICAIi[JN b~NGI~: 650 $1Z~ 1 ~EP COD~ ENTRY 66 0 I')A ['LI~I ,SPJ~,Cli; J. CA'I'ILIN oLLJCK,5: EaTR~ ! 2 3 4 5 7 q ! O ~5 DLPT bP ILD I)16 IbM Plb LLSU GR GH C NL CALl CNL D~HO ~ DC N~HI CNG HHOB CNb NEAT CNh NCNL CN6 ~ CNL CN6 GP BHC UI SHC UNITS APl AP1 AP1 APl E T 0 0 O O M V 7 1 0 O OHMN ? 12 40 0 UHM~ 7 12 44 0 OHMN 1 22 8 O GAPI 7 31 32 0 GAP I ~2 3 1 32 0 IN ~2 28 I 0 G/C ~ 42 4 ~ 0 O PU ~2 68 2 0 G/C3 42 35 I 0 C/C 42 ~2 1 0 CPS ~2 34 92 0 CPS 42 34 93 0 GAPI 60 31 32 0 lJSl~ bO 52 32 0 8IZ~ EAP 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 ~i 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 O 4 0 0 4 0 0 4 0 0 4 0 PROC SAM REP D~PT 0 1 O8 0 0 I 08 0 0 1 08 0 0 1 68 0 0 1 68 0 0 1 /:,8 0 0 1 b8 0 0 1 b8 0 0 1 u8 0 0 1 b8 0 0 I b8 0 0 1 b8 0 0 1 68 0 0 1 68 0 0 1 08 0 0 1 68 0 SHIFT DI: P'I'H 11fi64.000 11600.0O0 11500.000 11 40o. 000 11300.000 11200.000 1 i I OO. 000 000. 000 109u0.000 lOaOO.OOO 1oloo.ooo mNLMLIN IC F C N I~, G~ ~CN6 bP G~ NPHI NPBI 1; CNb SP GR ?'CNL SP GR NPHI ~CNL SP GR NPH 1 I. CrJb ,St-' GH NPtti I'CNL i~CNb I,{PHi i~ C ~ L VALUF. -41.219 112.063 0.814 10~28.000 -42.0OO 112.063 25.439 959.500 -51.825 112.O6] 13.770 2240.000 -105.438 112.063 20.752 14qO.O00 -53.03J 112.063 21.289 1490.000 -122.500 ]12.06~ 2~.b09 1228.000 -120.938 1i2.063 19.385 1418.000 -113.000 112.0o] 1b.650 1594.0o0 -12b.875 112.063 2].926 1151.000 -11o.31] 112.063 21.240 1235.000 -70.000 1 { 2.063 30.811 776.000 ILL GR G~ IbD IkH{)B ILO GR GR GR RflO~ GR ILO Gi~ i-(HOB GR lbo GR ILD GS GR lbo GR Gl+ GH HHUB G~ ILD GR GR VALUE ¢.516 1122.000 2.!04 128.125 4.348 140.500 2.658 128.125 9.242 i08.~13 2.646 10].125 ~.570 28.203 2.455 22.250 8.0{0 80.688 2.709 82.063 1.648 20.844 2.229 24.141 3.633 24.516 2.~93 21.734 2.533 39.219 2.b41 32.031 10.281 28.703 2.363 24.141 10.672 41.b25 2.373 35.281 13.133 136.125 2.959 132.315 MNLMONIC CALl NRA~ DI IGM CALl NRAT OI' CALl NRAT DT ibm CALl UT CALl bT CALl bRAT UT ibm CALl NRAT OT ILM CALl CALl NRAT DY CALl NHAI CALl NRAT VALUg 4.473 8.500 1.144 74.000 4.285 8.570 2.723 73. 150 8.625 8.359 1.920 68.56] 3.920 8.109 2.371 78.750 7.797 8.503 2.441 74.000 1.805 8.039 2.623 88.000 4.016 7.945 2.204 81.188 2.005 8.094 2.094 73.188 8.820 U.094 2.580 86.750 15.164 8.094 2.402 87,563 10.555 9.172 3.127 76.000 MNEMONIC bL8U DRHU NCNb hhSO oRHU NCNh LLSU DRHU NCNb DRHO NCNb bb8U DRHu NCNb bb8U ORHU NCNb bh80 DRHU NCNb bb8O DRHU NCNb Lb80 DHHO NCNb LLSU ORflU NCNb bb8U ORHO NCNb VA~Um 5.18~ 0.002 llblb. O00 4.710 0.101 2520.000 12.211 0.050 4400.000 9.680 0.003 3400.000 8.195 0.057 381~.000 4.19i 0.023 3172.000 ~.305 0.088 3228.000 5.379 O.Ob4 3084.000 14.195 0.042 2990.000 19.859 0.07] 3136.000 11.586 -0.027 2522.000 DI~P].' H 10600.000 10gU0 o 000 10400. 000 ! 0 ]oU. 000 10200.000 10100.000 10000.000 9qOO.O00 9800.000 9700.000 9090.000 MN~Mt,INIC VAbUE. &~UN1C VALUE MNk,~uNIC 8P -67.188 IbD 2.211 GE 112.003 GA 125.o88 CALl I~PMJ 39.097 RHUB 2,412 FCNIJ 450.250 GR 117.500 DT GR GR 5F GE 112 NPHI 35 ~Cl~h 504 1.410 115.000 2.453 99.750 .~75 .OOJ .840 .250 aP -]9,594 ILD 1,442 GE 111.875 GR -999.250 NPHI -99925.000 RHOO -999.250 ~CNI, -999.250 GR -999.250 5P -39.150 16D 1.402 GH 113.188 GR -999.250 NPttl -99925.O00 RHUB -999.250 ~CNL -999.250 GR -999.250 SP -39.969 NPHI -99925.000 FCNb -999,250 IUD GR GR 16D GE Gl:4 GR .EH{lB GH IuD GR RfliJB SP -42.000 GR 75.563 NPHI -99925.000 ~CNb -999.250 SP -41.81J b~ 78.000 NPHI -99925.000 kCNb -999,250 2.438 -999.250 -999,25o -999.~50 2.744 -999,250 -999,250 -999.250 2,586 -999.250 -999.250 -999.250 1,490 -999.250 -999.250 -999.250 5P -41.500 GR 98.56] NkHI -99925.000 kCNL -999.250 ~P -42,375 ILL 1.407 GP 108.500 G~ -999.250 NPHI -99925.000 RHOB -999,250 kCNb -999.250 G~ -999.250 8P -50.500 [6D 1.509 GA 105.125 GR -999.250 ,,P~I -99925.000 HHtJB -99q.250 ~C~6 -999.250 GR -999.250 1,745 -999,250 -999,250 -999.250 SP -52,250 G~ 99.625 NPHI -99925.000 fCNL -9q9.250 CALl Lq' CALl ibm CAbi NRA1' bT CALl NHAI IbM CALl NHA~ UT IbM CALl NRAT DT IbM CALl NRA'I DT CALl DT 1bM CALl NRAI 1317 CALl NRAT UT VALUE 2.207 11.758 100.315 1.552 13,188 3.b4b 108.563 1.719 -999,250 -999,250 -999,250 1.480 -999.250 -999,250 -999.250 2.572 -999.250 -999.250 -999.Z50 2.91b -999.250 -999.250 -999.250 2.19] -999.250 -999.250 -999.250 1.58/ -999.250 -999.250 -999.250 1.509 -999.250 -999.250 -999,250 1.571 =999.250 -999.250 -999,250 1.843 -999.250 -999,250 -999.250 MNEMONIC LLSU DRHO NCNb bbBU ORHU NCNb 6680 DRHU NCNb 6L8U DRHO NCNb 668u DRHO NCNb 6680 DRHO NCNb 6LBU DRHO NCNb 668U DRHO NCNb 6680 DRHO NCNb 668U DRHO NCNb 6680 DRHU NCNb VALUE 3.b5] 0.071 lbb6.000 2.30] u.100 1720.000 3.271 -999.250 -999.250 2.375 -999,250 -999.250 3.062 -999.250 -999.250 5,4]4 -999.250 -999.250 4.08b -999.250 -999.250 Z.512 -999.250 -999,250 2.424 -999.250 -999.250 2.41b -999.250 -999.250 2,824 -999.250 -999.250 9500.000 9400.000 9:300.000 9;)()0. 000 91 O0. 000 9000.000 89(.)0. 000 ~00.000 H700.O00 HOo0.O00 HSO0. 000 MNbNUNlC VAEUL -4~i.719 '19. 125 rJPnl -99925.000 rCNI, -999.250 LMUNIC VALUE 2.633 -999.250 -999.250 -999.250 bP -3q.bSH ILD 1,213 GE 113,063 GR -999.250 NFHI -99925.000 R~OB -999,250 ~CN6 -999.250 GR -999,250 ILD GH HHOB GR SP -]~.719 GR 105,438 NPH1 -99925.000 bCNL -999.250 1.091 -999,250 -999.250 -999,250 SP -31.313 IbD 1.095 GM 111,b25 GR -999,250 l~Pnl -99925.000 HRi.)O -999,250 ~CNI., -999.250 GH -999.250 SP -28.109 IbD G~ 101.938 GE NFH1 -99925.000 RHI)B ~Cl4b -999.250 G~ bP -32.000 GR 97.125 NPHi -~9925.000 fca6 -999.250 iLD 1.125 -999,250 -999.250 -999.250 1.412 -999.250 -999.250 -999.250 MN ~,M(]NIC ILM CALl ibm CAbl NHAT CAL 1 NRAi' DT ibm CALl NHAT DT ibm CALl NRA'I CALl NEAt DT VALU~ 2.861 -999.250 -999.250 -999.250 1.283 -999.250 -999.250 -999.250 1.159 -999.250 -999.250 -999.250 1.181 -999,250 -999,250 -999,250 1.203 -999.250 -999.250 -999.250 i.491 -999,250 -999,250 -999,250 MNLMONIC 6680 DRHO NCNb LBSU DRHO NCNb 6680 DRHO NCNb hLBO DRHU NCNb bbBO DRHU NCNb 6LSU DRHU NCNb SP -3b.406 1LD 1.754 IbM 1.826 6680 GR 99.375 GR -999.250 CALl -999.250 DRHO NPHI -99925.000 RHUB -999.250 NRA% -999.250 NCNb ~CNL -999.250 GR -999.250 Ul' -999.250 SP -~7.~75 ILD 2.266 IbM 2.268 bb8O GR 177.125 GR -999.250 CALl -999.250 URHO NPHI -99925.000 RHUB -999.250 NRAI -999.250 NCN~ fCNG -999.250 GR -999.250 DT -999.250 1.992 -999.250 -999.250 -999.250 2.477 -999.250 -999.Z50 -999.250 SP -35.000 ILD 1.811 Gk 244.500 GR -999.250 NPHI -99925.000 R,UB -999.250 ~Cmh -999.250 GR -999.250 bP -39.375 ILD 2.441 GM 174.875 GR -999.250 NPHI -99925.000 RHOB -999.250 ~CNL -999.250 G~ -999.250 IbM CALl NRA I Dt ILM CA61 NEAT ibm CALl NRA~' DT SP -~3.719 iLD ~.112 GE 119.563 GR -999.250 NPH1 -99925.000 ~HOB -999.250 FCNIa -999.250 G~ -999.250 3,398 -999,250 -999.250 -999.250 bbBO DRHU NCNb b68U DHHU NCNb 668U DRHU NCNb VAbUL 3.195 -999.250 -999.250 1,8lb -999,250 -999,250 1.718 -999.250 -999.250 1.731 -999.250 -999.250 1.BZb -999.250 -999.250 2.107 -999.250 -999.250 2.bbb -999.250 -999.250 5.869 -999.250 -999.250 3.137 -999.250 -999.250 4.168 -9~9.250 -999.250 7.320 -999.250 -999.250 UkP rH 000 8200.000 8 ! O0. 000 8000.000 790O. 000 I~U0.O00 770o.000 7600,000 7qO0.O00 MNkMU¢IC VAbU[L MN ZMUN lC SP '47.531 ILD GB 135.250 GR NCHI -99925.000 RHUB ~Cl~b -999.250 G~ 8P -30.344 GH 189.O00 GR NPHI -W9925.0Oo RMUb ~CNL -999.250 SP -30.344 ILD Gh 129.625 GR NPHi -99925.000 ~CI~L -999.250 GR '30.750 iI,D 132.875 G~ -99925.000 RHUB -999.250 GR SP -27.234 GR 90.500 NPHI -99925.000 fCNb -999.250 5P -2B.375 GF 94.563 NFH] -99925.000 fCNh -999.250 6P -27.250 GR 99.250 NPHi -99925.000 fCNh -999.250 6P -24.703 GA 95.500 NPHI -99925.000 ~CNb -999.250 SP -25.2b0 Gm 92.125 NPHi -99925.000 fCmb -999.250 ~P -25.750 GR 83.375 NPHI -99925.000 PCNL -999.250 SP -25.359 GM 72.438 NPH1 -99925.000 ~Cab -999.250 1LD GR hHUB GR GR GR ILD GR RHUB GR lbD GR ILD GR GR 1LD GR RHUB GH ILD GR GR VAI,UE 2.768 -999.250 -999.250 -999.250 1.43] -999.250 -999.250 -999.250 1.356 -999.250 -999.250 -99g.250 1.736 -999.250 -999.250 -999.250 2.006 999.250 -'999.250 -999.250 1.998 -999.250 -999.250 -999.250 1.977 -999.250 -999.250 -999.250 2.186 -999.250 -999.250 -999.250 2.182 -999.250 -999.250 -999.250 2.537 -999.250 -999.250 -999.250 1.784 -999.250 -999.250 -999.250 MN ~M(}N lC IbM CALk NRA'I CALl NRA'i ibm CALl NRAT Ul IbM CALl NRAI' CALl NRA1 DT IbM CALl uT CALl NRAT DT 1bM CALl NBAI DT ibm CALl NHAT IbM CALl N~AI ILM CAbi NRAT DT VALUE 2.813 -999.250 -999.250 -999.250 1.539 -999.250 -999.250 -999.250 1.330 -999.250 -999.250 -999.250 1.839 -999.250 -999.250 -999.250 2.148 -999.250 -999.250 -999.250 2.068 -999.250 -999.250 -999.250 2.063 -999.250 -999.250 -999.250 2.266 -999.250 -999.250 -999.250 2.373 -999.250 -999.250 -999.250 2.011 -999.250 -999.250 -999.250 1.722 -999.250 -999.250 -999.250 MNEMONIC LLBU DRHU NCNb bLSU DRHO NCNb bbSU DRHO NCNb bh8U DRHO NCNb LLSU DRHU NCNb LhSU DRHO NCNb hbSO DRHU NCNb bbSd DRHO NCNL DRHO NCNb bhSU DRHO NCNb hhSU DRHtJ NCNb VALUE 4.020 -999.250 -999.250 2.012 -999.250 -999.250 2.232 -999.250 -999.250 2.7~4 -999.250 -999.250 3.025 -9~9.250 -999.250 2.~93 -999.250 -999.250 2.803 -999.250 -999.250 3.078 -999.250 -999.250 3.496 -999.250 -999.250 4.27~ -999.250 -999.250 2.105 -999.250 -999.250 7 Df~ P~l H 7 ~00. 000 72u0,000 7100,000 7OOU.O00 bqO0.O00 bSuO. 6700.000 669O. OOO 6500.000 biO0.O00 MNLMUNIC YALUL SP -25.453 GR 94.125 NJ'HI -99925.000 ~CNL -999.250 $P '22.10 3 GB 73.375 NPI'ti -99925.000 I'CNL '999. 250 1LD GR RHUB Gl{ lad GR GR -25.250 ILD 119.O25 GR -99925.000 RHOB -999.250 GR SP -27.266 GM 105.188 GP NPHI -99925.000 RHOB ~CNb -999.250 GR -29.141 98.000 r4PHI -99925.000 PCNL -999.250 bP -30.188 GU 88.375 Nkftl -99925.000 ~CNL -999.250 6P -29.891 GM 89.56t NPHi -99925.000 ~('NL -999.250 SP -j1.094 GR 77.500 NPH1 -99925.000 fCNL -999.250 8P -37.156 GR 78.938 NPH1 -99925.000 FCNb -999.250 bP -57.844 GR 81.31~ NPHI -99925.000 fCNb -999.250 SP -66.81~ G~ 82.625 NPH1 -99925.000 ~CNL -999.250 RHUB GR ILD Gl{ RHUB GR ILD RHUB GR GR GR ILD Gl{ GR GR GR RHUB VALU~ 3.740 -999.250 -999.250 -999.250 4.137 -999.250 -999.250 -999.250 3.197 -999.250 -999.250 -999.250 3.898 -999.250 -999.250 -999.250 4.238 -999.250 -999.250 -999.250 3.285 -999.250 -999.250 -999.250 3.082 -999.250 -999.250 -99g.250 3.123 -99g.250 -999.250 -999.250 ~.602 -999.250 -999.250 -999.250 4.734 -999.250 -999.250 -999.250 5.246 -999.250 -999.250 -999.250 MNEMONIC ILM CALl NRAT DT CALl NHAI O~ IbM CALl NRA~ 1bM CALl NRAT DT IbM CALl NRA'I DT CALl NRAT UT ibm CALl NRAT D~ IbM CALl NRA% DT IbM CALl NRAI DI IbM CAUl NRA1 DT ibm CALl NRAT UT VALU . -999. -999. -999. . -999. -999. -999. . -999. -999. -999. . -999. -999. -999. . -999. -999. -999. . -999. -999, -999. . -999. -999. -999. -999. -999. -999. . -999. -999. -999. -999. -999. -999. . -999. -999. -999. 857 25O 250 25O 109 250 250 250 227 250 250 250 020 250 250 250 398 250 250 250 201 250 250 250 994 250 250 250 256 250 250 250 029 250 250 250 496 250 250 250 973 25O 250 250 MNkMONIC bhSU DRHO NCNb LLSU DRHU NCNb bbSU ORHO NCNb LbSU DRHU NCNb hbSO DRHO NCNb bbSU DRHO NCNb bbSU DRHU NCNb b~SU DRHO NCNb bbSU DRHU NCNb hbSO DRHU NCNb bbSU ORHO NCNb VALU~ 5.188 -999.250 -999.250 5.2?0 -999.250 -999.250 4.309 -999.250 -999.250 5.043 -999.250 -999.250 5.~28 -999.250 -999.250 4.023 -999.250 -999.250 -999.250 -9~9.250 4.305 -999.250 -999.250 4.184 -999.250 -999.250 7.371 -999.250 -999.250 ~.016 -999.250 -999.250 61 oU. O00 bOo0. 000 5~00. 000 5800.000 570U.000 5500. 000 %500.000 5400. 000 5:1 ~,, O. 000 520U,000 MN~NUNiC VALUE 72.938 NPHI -99925.000 ~CNL -999.z50 SP -47,875 GE 72.b88 NP.I -99925,000 ~CNL -999,250 SP G? 64.188 NPH1 -99925,000 fCNL -999.250 SP -111.93N GR 53.531 NPNI -99925.000 kCNL -999.250 bP -121.875 GR ~4.375 NPHi -99925.000 fCNL -999.250 Si' -120,188 GR 48.56] NPHI -99925,000 PCNL -999.250 MNLMUNiC GR [{HOB GR 1Lb GR RHOB GR ILD GR OR ILD GR OR lbo GR RMOB GR VALU -999. -999. -999. 0 -999. -999. -999. · -999. -999. -999. . -999. -999. -999. · -999. -999. -999. . -999, -999. -999. 8F -88.688 IbD 2. GR 52.188 GR -999· NPHI -99925.000 ~HUB -999· ~CNI, -999.250 GR -999. ILD GR HMUB GR 6P -95.375 GR ~3.438 NPhl -999d5.000 ~CNL -999.250 SP -92.688 GR 64.688 NPHI -99925.000 fCNL -999.250 SP -11o.188 GR 48.625 NPHI -99925.000 ~CNL -999.250 SP -78.875 GR 55.188 NPHI -99925.000 PC'NL -999.250 GR RHOB GR I LD GR GR GR RHUB G~ -999 -999 -999 0 -999. -999· -999. · -999. -999· -999. · -999. -999. -999. 889 250 25O 25O 320 250 250 250 482 250 250 250 876 250 250 250 324 250 250 250 348 250 250 250 ~77 250 25O 250 518 25O 250 25O 189 25O 25O 250 472 250 25O 250 178 250 250 250 MNEMONIC 1LM CALl NRA~ bT IbM CALl NRAI' DT kLM NRAT CALl N~AI DT CALl NRAT IbM CALl NRAI OT 1bM CALl NRAT UT CALl NRAI 01 ILM CALl PT kLM CALl NRAT OT IbM CALk NRAT DT VALU . -999. -999. -999. 0 -999. -999. -999. · -999. -999. -999. 0 -999. -999. -999. -999 -999 -999 i . -999. -999. -999. -999. -999. -999. . -999. -999· -999. . -999. -999. -999. · -999. -999. -999, 0 -999, -999. -999. 227 250 250 Z50 56J 250 250 250 043 250 250 250 459 250 250 250 716 250 250 250 573 25O 25O 250 014 250 250 250 170 250 250 250 744 25O 250 25O 771 250 250 250 516 25O 25O 25O MNEMONIC bbSO DRHU NCNL bbSU DRHO NCNb 6680 DRHO NCNb 6L80 DRHU NCNb 6680 DRHU NCNb bbSU DRHU NCNb bbSO DRHO NCNb DRHO NCNb 6580 ORHO NCNb LLSU [)RHO NCNb b68U DRNU NCNb VAbUL lO.b09 -999.250 -999.250 6.402 -999.250 -999·250 10.625 -999.250 -999.250 10.805 -999.250 -999.250 5.7bb -999.250 -999.250 7·652 -999·250 -999.250 1.703 -999.250 -999.250 ~.73~ -999.250 -999·250 8.055 -999·250 -999.250 5.184 -999.250 -999.250 5.191 -999.250 -999.250 [)LP'I H 51 (30. O00 5O00. 000 4qO0.O00 48U0.000 4700.000 460U.000 4500.000 q%UO.O00 42O0. O00 %100.000 MNLMONiC SP GR NPMI G~ NPHI SP GR NPHI GR NPttI PCNL SP [' C N L SP GR NPHI PCNb SP GR NPHI ~ CNI, SP GR NPttl [-CNL SP NPMI SP GR NPH1 PCNL GR NPHI P CNb VA -8 5 -9992 -99 -7 -999? -99 5 -9992 -99 -5 -9992 -99 -12 -9992 -99 -10 7 -~992 -99 -7 6 -9992 -99 -6 -9992 -99 -10 6 -9992 -99 -14 -9992 -99 -8 @ -9992 -99 LU 4. 5. 9, O. 5. 9. . g. 5. q. . 1. 5. 9. O . l. 5. 9. 0. 5. 9. . . 8. 5. 9, . 3. 5. 9. I . 0. 5. 9. . 3, 5. 9. 563 O00 250 75O 000 250 656 000 250 4]8 281 000 250 375 938 000 250 375 188 000 250 81~ 75O 000 250 063 938 000 250 313 188 000 250 25O 844 000 250 625 7'5O 000 250 MNLMUN1C GR GE iLD RHUB GR ILO GR RHOD GR GH GR lbo GR RHUB GR RHOB GR ILD GR RHUB GR GR GR IbD GE RHOB GR ILO RHOB GR lbo GR RHO~ GR VAb 2 -999 -999 -999 2 -999 -999 -999 3 -999 -999 -999 5 -999 -999 -999 2 -999 -999 -999 3 -999 -999 -999 8 -999 -999 -999 -999 -999 -999 2 -999 -999 -999 2 -999 -999 -999 5 -999 -999 -999 U L .008 .250 .250 .250 .805 .250 ,250 .250 .457 .250 .250 .250 .055 .250 ,250 ,250 ,688 .250 .250 .250 .090 ,250 .250 ,250 .977 .250 .250 .250 .984 .250 .250 .250 .957 .250 .250 .250 .750 .250 .250 .250 .250 .250 .250 Mm~.MONIC CALl NRAT IbM CALl NRAT OT CALl NRA'[ IbM CALl NRAI DT IbM CALl DT ILM CALi N~AI 1bM CALl NRAT DT CALl Ni.~A T Ol CALl NRAT iLM CALl NRAT ibm CALl NRAi VALUE 2.236 -999,250 -999.250 -999,250 2.973 -999,250 -999.250 -999,250 3.877 -999,250 -999,250 -999.250 4.898 -999,250 -999.250 -999.250 3.104 -999.250 -999,250 -999.250 3.520 -999.250 -999.250 -999.250 8.250 -999,250 -999.250 -999,250 4.063 -999.250 -999.250 -999,250 3.131 -999.250 -999.250 -999,250 ~.076 -999.250 -999,250 -999.250 4.828 -999.250 -999.250 -999.250 MNEMONIC LLSU DRHO NCNb bbSO ORHU NCNb bbSO O~HU NCNb GLSU DRHU NCNb bbSO DRHO NCNb LbSU DRHO NCNb LbSU DRHU NCNb bbSO DRHU NCNb bbSO DRHO NCNb bbSO DRHO NCNb bbSO DRHO NCNb VALUE -999.250 -999.250 4.~17 -999,250 -999.250 7,~49 -999.250 -999.250 b.590 -999.250 -999.250 8.150 -999.250 -999.250 1,762 -999.250 -999.250 13.188 -999.250 -999.250 5.273 -999.250 -999.250 4,088 -999.250 -999.250 6,398 -999,250 -999,250 6,004 -999.250 -999.250 3qu0.O00 ~800. 000 3700.000 3600. 000 ]500. 000 3400.000 3300.000 3200.000 ] 1 O0. OuO 3000.000 MN[' MbN1C VALU~ SP -107.500 GM 62.813 NPHI -99925.000 ~CNb -999.250 MNEMONIC lbo GR GR VAL 5 -999 -999 -999 8P -84.000 ILD 7 GE 74,250 GR -999 NPHI -~9925.O00 RH()8 -999 ~NL -999.250 GR -999 SP -85,500 1LD 4 GR 83.313 GR -999 NPHI -99925.000 R}lOb -999 FCNL -999.250 GR -ggg 6F -90.750 ILD 7 GR 73.688 GM -999 NPHI -99925.000 BHUB -999 ~CNb -999.250 GR -999 bP -117.250 GR 44,781 NPHI -99925.000 ~CNL -999.250 GR GR 7 -999 -999 -999 6P -90.125 lbo 8 GH 15,250 GR -999 NPHI -99925.000 RHOB -999 ~CNL -999,250 GR -999 8P -95,750 iLO 8 G~ b8,938 GR -999 NPHI -99925.000 RHOB -999 ~CNL -q99.250 GR -999 8P -89.000 [LD 7 OR 79.563 GR -999 NPHI -V9925.000 RHOB -999 ~CNb -999,250 GR -999 SP -94,125 JLD GM 61.250 GR NPHI -99925,000 RHOB ~CNL -999.250 GR -999 -999 -999 6P -84.563 iLD 6 GR 70,375 GR -999 NPHI -99925.O00 MHtJB -999 PCNb -999,250 GR -999 5P -104.b25 GR 62,531 NPH1 -99925.000 ~CN6 -999.250 ILD HHOb GR 5 -999 -999 -999 UE .395 .250 .250 .250 .074 .250 .250 .250 .250 .250 .250 .301 ,250 .250 .250 .051 ,250 ,250 .250 .609 ,250 .250 .250 .Ob3 .250 .250 .250 .230 ,250 .250 ,250 .15b .250 .250 .250 .758 .250 .250 .250 .125 .250 .250 .250 ~i~.MONIC ibm CAbI PT AbM CALl NRAI' IbM CALl ILM CAbI NRAI DT CALl NRAT DT ibm CALl NRAT DT CALl NRAT DT ILM CALl NRA]~ DT ibm CALl NhAT DT ILM CALl I~I~AT O1 IbM CADI NRA'I DT VALUE 0.207 -999.250 -999.250 -999.250 6.97] -999,250 -999,250 -999.250 3.781 -999.250 -999,250 -999.250 7.181 -999,250 -999.250 -999.250 7.566 -999.250 -999.250 -999,250 7.977 -999.250 -999.250 -999,250 8,375 -q99.250 -999,250 -999,250 7.195 -999.250 -999.250 -999.250 8.461 -999.250 -999.250 -999.250 6,930 -999,250 -999.250 -999,250 5.832 -999,250 -999,250 -999.250 MN~M£JN IC bbSU ORHO NCNb bLSU OHHO NCNb bhSU DRHO NCNb bLSU ORHO NCNb bbSU DRHO NCNb DRHO NCNb bbSO ORHO NCNb bbSO DRHO NCNb bLBU OReO NCNb bLSU DRHU NCNb DRHO NCNb VALUE 10.492 -999,250 -999,250 9,484 -999.250 -999.250 5.180 -999.250 -999,250 9,414 =999.250 -999,250 -999.250 -999,250 10.211 -999.250 -999.250 11.313 -999.250 -999.250 10,281 -999,250 -999.250 1i.344 -999,250 -999.250 i0.703 -999.250 -999.250 8,945 -999,250 -999.250 D~PTM 2.900.000 2HO0.OUO 2700,000 2680.000 MNkN{JNIC VALUk VAL ~P -74.000 lCD 4 G~ 50.088 GR -999 NP.I -99925.000 RBOG -999 ?CNL -999.250 GR -999 5P -60.813 £bD 3 GR 62.938 GR -999 NPM1 -99925.000 ~fltJS -999 ~CNt, -999.250 GR -999 8P -Sb. O00 1LD ] GR 62.Y19 GR -999 NPHi -99925.000 RIiUB -999 FCNL -999.250 G~ -999 SP -54.500 lCD GR 40.750 GR NPHI -99925.000 RHOB ~CNL -999.250 Gh 161l -999 -999 -999 UE ..t13 .250 .250 .250 .064 .250 .250 .250 .385 .25O .250 .250 .000 .250 .250 .250 MNIsMON lC IbM CALl NRAI UT IbM CALl N~A'i CAL£ NRAT ibm CALl NRAI DT VALUk 4.504 -999.250 -999.250 -999.250 2.560 -999.250 -999.250 -999.250 3.588 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 MNEMUNIC bL8U DRHO NCNb LLSU DRHU NCNb bb8U DRHU NCNb LL8U DRHU NCNL VALUE 5.199 -999.250 -999.250 3.568 -999.250 -999.250 5.281 -999.250 -999.250 1.294 -999.250 -999.250 .%UFIMAH]( Oi" DATA 1198 966 RECUI~D: 902 FlJ,k '].'HAILFR FII,E NA~4E: EDIa .001 MAXIMUM PHXSICAL F, ECURD LENGTH: N~.~XT F ]l,k NAME: ]'APE 'I~AIL, E}~ I,E, NGI'H: 132 D2Tk6 TAPk NA~,E: 00330 SF.:.R V 1 Cfc. NAMk: EDII ~APE CUNI'INUATI£)N NkXT I'AFE NAMk: 1024 BYTES DAIE: 80/ 0/12