Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout170-056 ) STATE OF ALASKA ) ALASKA 01L AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG I) JUN 0 g 2005 Zero Other 5. Date Comp., Susp., or Aband. 5/2/2005 6. Date Spudded 10/25/1970 7. Date T.D. Reached 12/05/1970 8. KB Elevation (ft): 56.74' 9. Plug Back Depth (MD+ TVD) 10817 + 9224 10. Total Depth (MD+TVD) 10940 + 9307 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL .1 ,I " , ~:"/II1'~lr;'II'I; ~~¡¡~I 1 b. Wel',~Glãss;<' G; "",¡!mo_.' .;)!!I!,I 181 Development mJi ¡~kpJb1r~fory o Stratigraphic 0 Service 12. Permit to Drill Number 170-056 305-074 13. API Number 50- 029-20084-00-00 14. Well Name and Number: PBU F-02 15. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool 1a. Well Status: 0 Oil 0 Gas 0 Plugged 181 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: OIL, FDC, LL3, SNP, BHCS, CBL / VOL / GR / CCL CASING, LINER AND CEMENTING RECORD ;'&¡;t;J:,~ç;!:Q~~:t1,H,:IMP"¡': ,,;$~if[~~~i.,qç~JI~IIWQ,i,i":',It8Iª¿E,::':::i :,B.O:rì:Ji'ÒM.;: li",:I: l,lliÔI?"':I'liIIBoìJ;~dryt!, ,;'II;:lil$12è,I:::::':¡;:'::;: Surface 92' , Surface 92' 36" 250 sx Permafrost II Surface 2321' Surface 2321' 26" 4700 sx Permafrost II 72#/64#/47# N-80/J-55/N-80 Surface 9302' Surface 8137' 12-1/4" 1932 sx Class 'G', 2350 sx Fondu 8802' 10928' 7749' 9299' 8-1/2" 500 sx Class 'G' o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3172' SNL, 2888' WEL, SEC. 02, T11N, R13E, UM Top of Productive Horizon: 1413' SNL, 3428' WEL, SEC. 11, T11N, R13E, UM Total Depth: 1810' SNL, 3965' WEL, SEC. 11, T11N, R13E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- __ 651960 y- 5973627 Zone- ASP4 TPI: x- 651496 y- 5970097 Zone- ASP4 Total Depth: x- 650967 y- 5969689 Zone- ASP4 18. Directional Survey 0 Yes 181 No 22. ""', '·i"'::I,~A~¡N~:1 I:: "1";lI','I',I'''811?-cl'I'",I, 1;':,:',::;1" '1,1 ;';" ,,'~~:':II,'I:'~:I" 30" 20" 13-3/8" x 9-5/8" Stove Pipe 133# K-55 7" 29# N-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD SCANNED JUN 1 i! 2005 26. Date First Production: Not on Production Date of Test Hours Tested Ft Ft 16. Property Designation: ADL 028280 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) ii:~M9~,t¡.J~,'i' ,':ii':I; ~DLL.EO':I,:: TVD SIZE DEPTH SET (MD) 5-1/2", 17#, L-80 8574' 4-1/2", 12.6#, L-80 8574' - 8703' ~5,:":"'" I ,i"',,:',Äð¡b:'I7AA8Yb~~;"CèMeN+SQÙ'EEiE, EtC. 1,1," ""'1 ',:',,' .'",.1' .1 I,,', . ,',' ',' I PACKER SET (MD) 8574' DEPTH INTERVAL (MD) 10428' 10430' AMOUNT & KIND OF MATERIAL USED Set Whipstock P&A w/ 27 Bbls Class 'G' PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oil -BSl PRODUCTION FOR TEST PERIOD -+ Flow Tubing Casing Pressure CALCULATED -11... Oll-Bsl Press. 24-HoUR RATE""'" 27. GAs-McF W A TER-Bsl CHOKE SIZE GAS-Oil RATIO GAs-McF W A TER-Bsl Oil GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFL JUN 092005 Form 10-407 Revised 12/2003 C) ti ¡ G i ¡\j 1\ L CONTINUED ON REVERSE SIDE C)F'- 28. ) ) GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9855' 8560' None Shublik 9909' 8598' Sadlerochit 10024' 8680' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed TerrieHUbble~QNÙg J)~. TiUe TechniælAssislant Date Or:olDB/ôs PBU F-02 170-056 305-074 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Drilling Engineer: Sean McLaughlin, 564-4387 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Well: Field: API: Permit: ) ) 05/02/05 05/04/05 05/10/05 Nordic #1 01115/05 RUN 33/8" DUMMY GUN WI SAMPLE BAILER SO AT 10750' SLM. LOCATE EOT AT 8684' SLM. RUN CALIPER STOP AT 8700' SLM. POOH 55' FPM, DATA LOOKS GOOD. F -02A Prudhoe Bay Unit 50-029-20084-01-00 205-049 Accept: Spud: Release: Rig: 04/15/05 DRIFT AND TAG AT 10,758' SLM WITH A 3.70" CENT. CALIPER THE TUBING FROM 10770' TO 8730' SLM. PRE-RIG WORK 04/17/05 CORRELATED TO SWS CEMENT BOND LOG DATED 28-MAY-1976. SET TOP OF BAKER WHIPSTOCK AT 10424'. PIP TAGS AT 10434.1'. ) ) BPEXPLORATION Operations Summary Report Page 1 _ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-02 F-02 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 5/1/2005 Rig Release: 5/10/2005 Rig Number: 1 Spud Date: 10/25/1970 End: 5/10/2005 Date From - To Hours Task Code NPT Phase Description of Operations 1/2/1900 00:00 - 00: 15 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigation for backing rig over well. 00: 15 - 00:30 0.25 MOB P PRE Back rig over well. 00:30 - 02:30 2.00 BOPSURP PRE ACCEPT RIG AT 00:30 HRS, 05/02/2005. N/U BOPE. Had to cut off rusted studs on tree cap. 02:30 - 10:00 7.50 BOPSURP PRE Pressure 1 Function test BOPE. Witness waived by AOGCC inspecter, Chuck Scheeve. 10:00 - 11 :00 1.00 KILL P WEXIT Open well. 1250 psi. Bullhead well. @5.7 blm at 1100 psi. 11 :00 - 13:00 2.00 KILL P WEXIT Wait on fluids. 13:00 - 15:00 2.00 KILL P WEXIT Fill coil pump dart. Got it on second try 58.5 bbl. Well start red to flow. Shut in while pumping date. 15:00 - 17:15 2.25 KILL P WEXIT MU cementing nozzel stab onto well. Wellhead pressure 650 psi. Line up thru choke to tiger tank. RIH. Tag WS at 10450. Up wt 41K, DN wt 21K, 17:15 - 18:15 1.00 KILL P WEXIT RU cementers 18:15 - 18:30 0.25 KILL P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for pumping cement. 18:30 - 18:45 0.25 KILL P WEXIT Batch cement to 15.8 ppg. Pressure test cement line. 18:45 - 19:45 1.00 KILL P WEXIT Stage 27 bbls, 15.8 ppg, G Cement. 1.5 bpm, 700 psi, no returns. Displace with 10 bbls 2% KCL water with cement pump. Swap to rig pumps. 20 bbls displ, 3.1 bpm, 740 psi, no returns. 31 bbls displ, 3.0 bpm, 1700 psi, cement at nozzle. pull at 5 fpm. 35 bbls displ, 2.2 bpm, 330 psi, no returns. 40 bbls displ, 2.2 bpm, 330 psi, no returns. pull at 50 fpm. 50 bbls displ, 2.2 bpm, 720 psi, no returns, pull at 50 fpm. 55 bbls displ, 2.2 bpm, 990 psi, no returns, pull at 50 fpm. 58.5 bbls displ, 2.2 bpm, 1100 psi, no returns. stop pump, Coil fully displaced. Cement in place at 1925 hrs. Pull to safety at 8400'. Pump 0.5 bpm, 20 psi. no returns. 19:45 - 20:15 0.50 KILL P WEXIT Circ at 8400', 0.5 bpm, no returns. 20: 15 - 22:00 1.75 KILL P WEXIT RIH while circ at 0.85 bpm, 140 psi. No returns. Ordered 40 bbls Cement. No crew available, SWS will not pump cement without cement UCA test. RIH with minimum pump at 0.3 bpm. No cement above whipstock. Tag whipstock pinch point at 10,428'. POH to safety again. 100 bbls KCL pumped since cement job with no returns. 22:00 - 00:00 2.00 KILL P WEXIT Wait on cementers. No crew available. Cement being tested. 4/30/2005 00:00 - 13:00 13.00 MOB N WAIT PRE Wait for Rig 2ES to move past PBOC before security will allow the Nordic 1 rig move to start. Rig on Standby. 13:00 - 21:15 8.25 MOB N PRE Wait on tool services to support rig move. Rig on Standby. 21:15 - 21:30 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigation for Rig Move with all personnel. 21 :30 - 22:30 1.00 MOB P PRE Move rig down DS18 access road to intersection with West Dock Road. Park rig at intersection. Printed: 5/16/2005 11 :58:51 AM ') ) BP EXPLORATION Operations Summary Report Page 2 .- Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-02 F-02 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 5/1/2005 Rig Release: 5/10/2005 Rig Number: 1 Spud Date: 10/25/1970 End: 5/10/2005 Date From - To Hours Task Code NPT Phase Description of Operations 4/30/2005 22:30 - 00:00 1.50 MOB N PRE Wait for Rig 2ES, second part of rig move, to move past PBOC before security will allow the Nordic 1 rig move to start. Rig on Standby. 5/1/2005 00:00 - 01 :30 1.50 MOB N PRE Wait on Rig 2ES rig move. Rig on standby. 01 :30 - 06:30 5.00 MOB P PRE Move rig up West Dock road to K pad road. 06:30 - 13:30 7.00 MOB N PRE Rig had a 1" Hydraulic hose to the #1 Drive motor fail, causing a 25 gallon spill of hydraulic fluid to the gravel road. The crew shut off hydraulic power and contained the spill on the road bed. Enviromental 5700 was notified and the BP, SWS, Nordic management and the Drilling HSE advisor were also notified of the spill. The hose was replaced and all other hydraulic drive hoses were checked prior to moving the rig. The spill was cleaned up by Environmental. 13:30 - 18:00 4.50 MOB P PRE Moved the rig to F pad. 18:00 - 00:00 I Positioned rig in front of F-02A. 6.00 MOB P PRE Pumped open SSV to check WHP. Well had 2300 psi. Well was killed on Friday. Called Little Red to bullhead kill well with seawater. Pumped 450 bbl seawater at 5 bpm. Well on vac. Rig down Little Red. 5/2/2005 00:00 - 00: 15 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigaion for backing rig over well. 00:15 - 00:30 0.25 MOB P PRE Back rig over well. 00:30 - 02:30 2.00 BOPSUR P PRE ACCEPT RIG AT 00:30 HRS, 05/02/2005. N/U BOPE. Had to cut off rusted studs on tree cap. 02:30 - 10:00 7.50 BOPSUPP PRE Pressure 1 Function test BOPE. Witness waived by AOGCC inspector, Chuck Scheeve. 10:00 - 11 :00 1.00 KILL P WEXIT Open well, 1250 psi, Bullhead well, 5.7 bpm, 1100 psi. 11 :00 - 13:00 2.00 ZONISO N WAIT WEXIT Wait on fluids. 13:00 - 15:00 2.00 ZONISO P WEXIT Fill coil, pump dart, Got it on second try at 58.5 bbl. Well started to flow. Shut in while pumping dart. 15:00 - 17:30 2.50 ZONISO P WEXIT M/U Cementing nozzle, stab onto well. WHP = 650 psi. Line up thru chock to tiger tank. RIH. Tag Whipstock at 10,450'. Correct Depth to 10,428' at pinch point. Flag coil at 10,418 ft. Up wt = 41K, Dwn wt = 21K. 17:30 - 18:15 0.75 ZONISO P WEXIT RIU Cementers. Crew change. 18:15 - 18:30 0.25 ZONISO P WEXIT SAFETY MEETING. Review procedure, hazards and mitigaion for pumping cement. 18:30 - 18:45 0.25 ZONISO P WEXIT Batch cement to 15.8 ppg. Pressure test cement line. 18:45 - 20:00 1.25 ZONISO P WEXIT Stage 27 bbls, 15.8 ppg, G Cement, 1.5 bpm, 700 psi, no returns. Displace with 10 bbls 2% KCL water with cement pump. Swap to rig pumps. 20 bbls displ, 3.1 bpm, 740 psi, no returns. 31 bbls displ, 3.0 bpm, 1700 psi, cement at nozzle, pull at 5 fpm. 35 bbls displ, 2.2 bpm, 330 psi, no returns Printed: 5/16/2005 11 :58:51 AM ') ) BP EXPLORATION OperationsSummary'Report Page.3~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-02 F-02 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 5/1/2005 Rig Release: 5/10/2005 Rig Number: 1 Spud Date: 10/25/1970 End: 5/10/2005 Date From - To Hours Task Code NPT Phase Description of Operations 5/2/2005 18:45 - 20:00 1.25 ZONISO P WEXIT 40 bbls displ, 2.2 bpm, 330 psi, no returns, pull at 50 fpm. 50 bbls displ, 2.2 bpm, 720 psi, no returns, pull at 50 fpm 55 bbls displ, 2.2 bpm, 990 psi, no returns, pull at 50 fpm 58.5 bbls displ, 2.2 bpm, 1100 psi, no returns. stop pump. Coil fully displaced. Cement in place at 1925 hrs. Pull to safety at 8400' with no pump. Wait 30 min, then Circ. at 0.5 bpm. no returns. 20:00 - 20:30 0.50 ZONISO P WEXIT Circ at 8400' at 0.5 bpm, no returns. 20:30 - 22:00 1.50 ZONISO P WEXIT RIH while circ at 0.8 bpm, 140 psi, no returns. 10200', RIH with 0.2 bpm, RIH to pinch point at 10428' with no indication of cement, no wt loss POH to safety again. 22:00 - 00:00 2.00 ZONISO P WEXIT Wait on cement with nozzle at 8400'. Circ at 1 bpm. Started getting returns at 2345 hrs. Cement in place 4-1/2 hours. Circ 2 bpm, full returns. RIH again to tag cement. 5/3/2005 00:00 - 00:30 0.50 ZONISO P WEXIT RIH and tag hard cement at 10416', 2 ft above flag, which was 10' above pinch point. Set down 5K on hard cement. Pick up and circ 2 bpm with full returns. Whipstock is cemented and perfs are sqeezed off. 00:30 - 02:45 2.25 ZONISO P WEXIT POH with cementing stinger. Full returns at 2 bpm at surface. 02:45 - 03:00 0.25 ZONISO P WEXIT Layout cementing stinger. 03:00 - 04:00 1.00 STWHIP P WEXIT M/U Baker Left hand coil connecter, Pull I Press test CTC. M/U Baker Left hand 3.80" milling BHA to mill XN Nipple in tailpipe. OAL = 16.98'. 04:00 - 05:25 1.42 STWHIP P WEXIT RIH with LH 3.80" milling BHA. 0.2 BPM, 120 PSI. 18K dwn wt. 40K up wt. Tag XN Nipple at 8,669'. 05:25 - 06:00 0.58 STWHIP P WEXIT Mill XN Nipple with left hand 3.80" milling BHA. 2.6 bpm, 2390 psi, full returns. Mill thru it in 10 min. Very little motor work. Very light WOB. Reamed up and down 3 times. XN Nipple is clean. 06:00 - 07: 15 1.25 STWHIP P WEXIT POH. 07: 15 - 08:30 1.25 STWHIP P WEXIT LD left hand mill, motor MHA. PU window milling assembly. 08:30 - 10:30 2.00 STWHIP P WEXIT RIH tag top of cement at 10435' 10:30 - 12:00 1.50 STWHIP P WEXIT PU WT 47K, DN WT 16.5K, Mill cement with 100 psi differential. Tag pinch point at 10450'. Mill window with 2.671 2.7 bpm at 2100 psi. Free spin 2000 psi. 12:00 - 13:00 1.00 STWHIP P WEXIT Continue milling window @ 10452.5,3800# WOB, 2.7 bpm at 2200 psi. 13:00 - 14:00 1.00 STWHIP P WEXIT Continue milling window @ 10453.4,3800# WOB, 2.7 bpm at 2300 psi. 14:00-15:00 1.00 STWHIP P WEXIT Continue milling window @ 10455.0,4000# WOB, 2.7 bpm at 2100 psi. 15:00 - 15:30 0.50 STWHIP P WEXIT Continue milling window @ 10456.3,4500# WOB, 2.7 bpm at 2200 psi. Increase on motor work possibly exiting window.Stall, Pick-up 2.6 bpm at 1700 free spin. 15:30 - 17:20 1.83 STWHIP P WEXIT Back ream window twice. Drift window wlo pump, clean. 17:20 - 18:00 0.67 STWHIP P WEXIT Off load biozan and prepare for mud swap while continuing to ream window. Printed: 5/16/2005 11 :58:51 AM ) ') Page 4 ... BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-02 F-02 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Date From - To Hours Task Code NPT Phase WEXIT 5/3/2005 18:00 - 20:15 2.25 STWHIP P 20:15-21:00 0.75 STWHIP P 21:00 - 21:15 0.25 DRILL P 21 : 15 - 23: 15 2.00 DRILL P 23:15 - 00:00 0.75 DRILL P 5/4/2005 00:00-01:15 1.25 DRILL P 01 : 15 - 01 :30 0.25 DRILL P 01 :30 - 03:00 1.50 DRILL P 03:00 - 04:30 1.50 DRILL P 04:30 - 05:50 1.33 DRILL P 05:50 - 06:30 06:30 - 11 :00 0.67 DRILL P 4.50 DRILL P 11 :00 - 14:00 3.00 DRILL P 14:00 - 15:45 1.75 DRILL P 15:45 - 17:20 1.58 DRILL P 17:20 - 19:15 1.92 DRILL 19:15 - 19:30 0.25 DRILL 19:30 - 20:00 0.50 DRIL 20:00 - 20:15 0.25 D L 20:15 - 21 :00 0.75 RILL 21 :00 - 22:15 5 DRILL 0.17 DRILL P 1.58 DRILL P 5/5/2005 0.50 DRILL P 1.25 DRILL P WEXIT PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Start: 5/1/2005 Rig Release: 5/10/2005 Rig Number: 1 Spud Date: 10/25/1970 End: 5/10/2005 Description of Operations Displace well to reconditioned FloPro. POH chasing FloPro to surface. UO milling BHA. Cut off BKR CTC. M/U SWS CTC. Pull I Press test. SAFETY MEETING. Pre-Spud meeting with all personnel. Reviewed well plan, hazards and mitigation. Had PJSM for M/U MWD RES drilling BHA. M/U BHA #3, MWD RES BHA with 3.0 deg motor, HCC re-built bi-center bit #2. Up-load RES tool. OAL = 82 ft. RIH with RES MWD build BHA #3. SHT at 4000'. Continue to RIH. RIH with MWD RES build BHA to 10300'. Orient TF to 5A. RIH clean thru window. Tagged TD at 10,466'. Drilled 22 build, 2.7/2.7 bpm, 3100 -4000 psi, 5R. 49 deg. Drilled to 10479 Drilled 22 build, 2.7/2.7 bpm, 3100 ·4000 psi, 61 deg. Drilled to 10516'. Log GR tie-in with original GR åt 10.000'. correction. CTD was never corrected to Whip tie-in for whipstock. RIH. Tag bottom at 10,496' Drill build section from ,LJ96' to 10,596' building angle to 84 deg. 2.7/2.7 bpm 2 30 - 50 fph Pull up to window to orient as needed. Cont' e drilling to build to 10,675'. d well at 8963' TVDss, 87 deg. Inclination. CBU for cuttings sample. Flush 9 5/8" casing. Chase sample OOH. LD bit and change motor bend to 1.04 deg. Bit graded 4-4-BT-A-X-X-JD-BHA. Download RES tool. RIH. Orient TF to high side. RIH clean thru window. Log GR tie-in with RA tag. -23 ft CTD. RIH and tag bottom at 10,677' Orient TF around to 34L. Drilling 22 Lateral. 2.6/2.6 bpm, 3100 - 3900 psi, 30L, 86 deg incl, Drilled to 10710'. Orient TF to 85R. Drilling 22 Lateral. 2.6/2.6 bpm, 3100 - 3900 psi, 85R, 89 deg incl, Drilled to 10742'. Orient TF. Had to pull to window to get clicks. Drilled Z2 Lateral, 2.7/2.7 bpm, 3100 - 3900 psi, 97R, 89 deg incl, 50 fph. Drilled to 11807'. PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Printed: 5/16/2005 11 :58:51 AM ~~' 5J'¡~-~"\1!:i"?r f? 1,',"1 ii. I, '6 ' t I 'fi' . f, , ."'\ i . " \ Ii r /: , t, ¡, :\'. I!UüU 11 f' '~~ ~? : l ~. ¡ ¡, ¡ i .[ ir·"", ' ! f ¡ H i ~ ) I r"~ ~¡'; ,1~ .'ßi11 , '" II "n' ~ rU.L! Lffii I'~ \ I a I I' I\,. \ I ! \ ! b~ I U \ ~J) I: í ¡ .; \ n'1l ,/ il~ {/ \ \~~ ) It"'?~ ,()",¡;¿:;-~, """ '. F":¡¡¿~:""""'~ ".\' J' ~ A.I,A.SKA. OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7fH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay F-02 Sundry Number: 305-074 Dear Mr. Stagg: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a, . .ay or weekend. A person may not appeal a Commission decision to Superior ourt 'mless rehearing has been requested. ( DATED thiS~~Y of March, 2005 Encl. SCANNEr~ ÞPR 1 4 2005 \LJ6A- 3/'l."S1 lOOS ) STATE OF ALASKA ) oì.s 11~'JS ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED APPLICATION FOR SUNDRY APPROVALMAR 222005 20 AAC 25.280 Alaska Oil &. Gas Cons. CommlllÎan Anchorage 1. Type of Request: I a Abandon' 0 Repair Well 0 Plug Perforations 0 Stimulate o Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver o Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well o Other o Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: /' 181 Development D Exploratory D Stratigraphic D Service 5. Permit To Drill Number 170-056 .,/' 6. API Number: / 50- 029-20084-00-00 99519-6612 56.74' 9. Well Name and Number: PBU F-02 / 8. Property Designation: ADL 028280 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool PRESENT WELL CONDITION 'SUMMARY Effective Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): 10817 9224 None Size MD TVD Burst Junk (measured): 10817 Collapse 11. Total Depth MD (ft): 10940 Casing Structural .I Conductor Surface Intermediate Production Liner Total Depth TVD (ft): 9307 Length 92' 30" 92' 92' 2321' 20" 2321' 2321' 2320 1500 9302' 13-3/8" x 9-5/8" 9302' 8137' 3450 2950 2126' 7" 8802' - 10928' 7749' - 9299' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): 10188' - 10526' 8795' - 9028' Packers and SSSV Type: 9-5/8" x 4-1/2" Baker packer; 5-1/2" Camco SSSV Landing Nipple Tubing Size: 5-1/2", 17# x 4-1/2", Tubing Grade: L-80 Packers and SSSV MD (ft): 8574' 2149' Tubing MD (ft): 8703' 12. Attachments: 181 Description Summary of Proposal D Detailed Operations Program 14. Estimated Date for Commencing Operations: D BOP Sketch 13. Well Class after proposed work: D Exploratory 181 Development D Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Nam~ Ted",S~ag . _ __ Title CT Drilling Engineer Signature ~ r. Phone 564-4694 Commission Use Only April 1, 2005 Date: 15. Well Status after proposed work: DOil DGas D WAG D GINJ /' D Plugged 181 Abandoned D WINJ D WDSPL Contact Ted Stagg, 564-4694 Date f1cJ Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: --3:.--5-:-0~-7 c.( D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance Other: !tppw lid r::; /',.. rv<- c - 40 I ri; UA.·N'd to r ~ ~ 1vt/..<.íL ~,{N( \~FE-l~~~~ -( ,d~ '),QD~1 ~~ tc 0 bLA~- " RBDMS BFL MAR 2 9 Z005 APPROVED BY COMMISSIONER THE COMMISSION ORIGINAL Date ~~£: ) ') 0):) To: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Ted Stagg CTD Engineer Date: March 21, 2005 Re: Prep Prudhoe F-02 for CTD sidetrack Prudhoe Bay well F-02 is scheduled for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or around April 15, 2005. The sidetrack, F-02A, will exit the existing 7" liner from a whipstock in Zone 2 and will target Zone 2 sands. Existing perforations will be cement squeezed past a whipstock set at 10,430'. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Pre CTD Summary l) Complete integrity testing 2) Set mechanical whipstoc t -~0,430' . / 3) Squeeze a minimum of 5 b ~,cement past whipstock to shut-off existing perfs. 4) Blind flange flowline re .ve wellhouse and level pad. The pre CTD work is slated to begin on Aprill, 2005. J/~- Ted Stagg CTD Drilling Engineer 564-4694 CC: Well File Sondra Stewmanfferrie Hubble í ì I 8551 ' 1-1 BOT-SBR TBG SEAL ASSY I ----i 8574' 1-19-5/8" X 4-1/2" BOT PKR, ID = 3.958" I I 8574' 1-15-1/2" X 4-1/2" XO I 1 I 8625' 1-14-1/2" OTIS X NIP, ID = 3.813" I I 8658' 1-14-1/2" OTIS XN NIP, ID = 3.725" I I 8703' 1-14-1/2" TBG TAIL I 1 8695' 1-1 ELMD TT LOG NOT A V AILABLE 1 I ~ 9768' 1-1 MARKER JOINT I ) TREE = ' 6" CWV WELLH~D'= McEVOY Aè'TuÁfoR;';;" " ·····ÖTIS' ·ï('s':'··ËCËV··;;;;···'·· ··········"'..'..5i:Li4i ï3ï='~"'ELEV"; .... .......... ...··..·3Sj)'gï' '¡{OP;;;;'" ........... ···..···'··'..àäooï Max Ängls";;;;"48@ 1'0866' '5ãtüm'MD~;""'-""""""""'''''Tò278ì "5ãtumiV5;;;'~-'-äã6o'Ss" 113-3/8" CSG, 72#, N-80, ID = 12.415" 1-1 113-3/8" CSG, 68#, J-55, ID = 12.415" 1-1 19-5/8" CSG, 47#, L80, ID = 2244" 1-1 120" CSG, 133#, K-55-BTRS, ID = 18.73" 1-1 F-02 e I ~----l ~ ~ ~ 2084' 2084' 2244' 2321' g Minimum ID = 3.725" @ 86581 OTIS XN NIPPLE I I I 5-1/2" TBG-IPG, 17#, L-80, ID = 4.892" 1-1 8703' I TOP OF 7" LNR 1-1 8802' "l 19-5/8" CSG, 47#, N-80 SEAL LOCK, ID = 8.681" 1-1 9302' µ ÆRFORA TION SUMMARY REF LOG: BHCS ON 12/06/70 ANGLE AT TOP PERF: 46 @ 10188' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 10188 - 10192 0 07/14/99 2-7/8" 6 10197 - 10200 0 05/01/99 4" 4 10276 - 10306 S 04/26/89 4" 4 10315 - 10358 S 04/26/89 4" 4 10374 - 10394 S 04/26/89 3-3/8" 4 10394 - 10414 0 04/29/89 4" 4 10430 - 10442 S 04/26/89 4" 4 10452 - 10470 S 04/26/89 3-3/8" 4 10480 - 10526 0 04/29/89 ~ I PSTD 1-1 10817' ~ I 7" LNR, 29#, N-80 X-LINE, ID = 6.184" 1-1 10928' DATE 12/12/70 10/24/83 03/05/01 07/17/01 06/01/02 05/07/03 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVER SIS-MD FINAL RNlTP CORRECTIONS TW/KAK PERF CORRECTION ATDfTP CSG DATA CORRECTIONS DA TE REV BY COMMENTS 07/12/03 CMOfTLP MAX ANGLE CORRECTION 07/19/03 MVTLH FISH 10/24/03 TW/TLH CASING CORRECTIONS ') SAÆTY NOTES: 2149' 1-15-1/2" CAMCO SSSV LAND NIP, ID = 4.562" 20841 1- 13-3/8" TIEBACK (BAASH-ROSS EXTERNAL CSG PATCH) 2244' l-t 13-3/8" X 9-5/8" TIW PKR I 2250' l-t 13-3/8" X 9-5/8" XO I ~ 8489' 1-1 BAKER MDL L 5-1/2" SLIDING SLV, ID = 4.313" 1 1- 40% OF 6" SEAT RING FROM SWAB VL V (6"Lx3/4"Wx1/2"THICK) (07/19/03) 10817' I-IWD PKR I PRUDHOE BA Y UNIT WELL: F-02 ÆRMIT No: 1700560 API No: 50-029-20084-00 SEC2, T11N, R13E, 2107.42' FSL &2391.67' FWL BP Exploration (Alaska) i. TREE :;. 6" CIW WELLHEAD = Mc~OY ACTUA TOR = OTIS KB. B.EV = J' 56.74' BF. B.EV = 38.09' KOP = 3800' Max Angle = 48 @ 10800' Datum MD = 10278' Datum TVD = 8800' SS 113~3/8" CSG, 72#, N~80, ID = 12.415" 1- ,\,II \ "~I I"~ #' . \, \.1.1.1'\\'.\ \' 1,1,\.' \\1\ \'.' .\ 10'\ \, " ,,, I'. .'.1' I' I 113~3/8" CSG, 68#, J~55, ID = 12.415" 1- 19~5/8" CSG, 47#, L80, ID = 2244" 1-1 120" CSG, 133#, K~55-BTRS, ID = 18.73" 1-1 ) F -02A I hNOTES: Proposed CTO Sidetrack e 2149' 1-I5~1/2" CAMCO SSSV LAND NIP, 10 = 4.562" /' ~ 2084' 1- 13-3/8" TIEBACK (BAASH-ROSS EXTERNAL CSG PATCH) 2084' 2Ö84' I ~ g 2244' 1-113-3/8" x 9-5/8" TIW PKR 1 2244' 2250' Ii 13-3/8" x 9-5/8" XO 1 2321' ~ ~ Minimum ID = 3.725" @ 8658' OTIS XN NIPPLE (Milled to 3.8" 10) TOPOF 3~3/16" LN~-I 15-1/2" TBG~IPC, 17#, L~80, ID = 4.892" 1-1 8635' 1 8703' I TOP OF 7" LNR 1-1 8802' 13.5" X Nip 2.813" 101-1 8650' 19-5/8" CSG, 47#, N-80 SEAL LOCK, ID = 8.681" 1-1 9302' I Top of Cement I~ 10050' ÆRFORA TION SUMMARY REF LOG: BHCS ON 12/06/70 ANGLEAT TOP PERF: 46 @ 10188' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/SQz DA TE 3-3/8" 4 10188 - 10192 isolated proposed 2~7/8" 6 10197 - 10200 isolated proposed 4" 4 10276 - 10306 isolated proposed 4" 4 10315 - 10358 isolated proposed 4" 4 10374 - 10394 isolated proposed 3-3/8" 4 10394 ~ 10414 isolated proposed 4" 4 10430 - 10442 isolated proposed 4" 4 10452 - 10470 isolated proposed 3-3/8" 4 10480 - 10526 isolated proposed I PBID 1-1 10817' 17" LNR, 29#. N-80 X-LINE, ID= 6.184" 1-1 10928' I I 8489' I-iBAKER MDL L 5-1/2" SLIDING SLY, 10 = 4.313" 1 í i 8551' 1-1 BOT-SBR TBG SEAL ASSY 1 ---1 8574' 8574' 8625' 8658' 8703' 8695' ~ ~ ~ ~.....(i~, I 1--19-5/8" X 4-1/2" BOT PKR, ID = 3.958" 1 1-15-1/2" X 4-1/2" XO 1 .I-i4~1/2" OTIS X NIP, ID = 3.813" 1 1-14-1/2" OTIS XN NIP, ID = 3.725" I(Milled to 3.8" 10) 1-14-1/2" TBG TAIL 1 1-1 B.MD TT LOG NOT AVAILABLE I 9768' 1-1 MARKER JOINT I 10430' 1-1 Mechanical Whipstock 1 ~ 10700' 1-13-3/16 x 2-7/8 X-over -' ~ I 3-3/16" X 2-7/8" cmt'ed and perfedl-t 12200' I -I 1- 40% OF 6" SEAT RING FROM SWAB VL V (6"Lx3/4"Wx1/2"THICK) (07/19/03) I 10817' l-IwD PKR I DA TE REV BY COMMENTS 07/12/03 Cfv10ffiP MAX A NGLE CORRECTION 07/19/03 MffiH FISH 10/24/03 lWffiH CASING CORRECTIONS DATE 12112170 10/24/83 03/05/01 07/17/01 06/01/02 05/07/03 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVæ SIS-MD FINAL RNfTP CORRECTIONS lW/KAK PERF CORRECTION A IDITP CSG DATA CORRECTIONS PRUDHOE BA Y UNIT WB.L: F-02 PERMIT No: 1700560 API No: 50-029-20084-00 SEC 2, T11N, R13E, 2107.42' FSL & 2391.67' FWL BP Exploration (Alaska) MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation Commission Julie Heusser, ~'~'~\ DATE: March 27, 2001 Commissioner ~ Tom Maunder, P. I. Supervisor /~'o,~!cr~-~ FROM: Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit BPX / F-Pad March .27, 2001: I traveled to BPX's F-Pad in the Prudhoe Bay Field to witness Safety Valve System tests. Merv Liddeiow, BPX representative in charge of testing, performed the tests in a safe and proficient manner. Of the 24 wells tested, 13 failures were witnessed. Wells F-01 and F-15 were shut in pending repairs. Mr. Liddelow indicated to me that ali other failures had been corrected and successfully re-tested within 24 hours. The AOGCC test report is attached for reference. I conducted 24 well house inspections concurrent with the SVS tests, with no exceptions noted. SUMMARY; i witnessed SVS tests and conducted well house inspections On BPX's F-Pad in the Prudhoe Bay Field. 24 wells, 48 components tested. 13 failures. 27.08% failure rate. 24 well house inspections conducted. Attachments: SVS PBU F Pad 3-27-01 JJ CC: N ,O.N-CONFIDENTIAL SVS PBU F Pad 3-27-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX OPerator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/F-Pad Separator psi: LPS 153 Date: 3/27/01 HPS 650 ii i i i i i ii Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI T,rip Code Code Code Passed GAS or CYCLE F-'0i' ]700460 '' 650 ' 550 490 P '5 .... OIL iF'02 '~"' 1700560 650 550 530 P " P ~' ' O~L , , F-03 1700580 , F-04 1710020 F-05 1710090 650 55'0 330 i '4 .......... OiL F.06 '' 1710120 ................ F-07 1720230 F-08 1740110 F-09 1790760' ' '650 '" 5~} 5~0 p 4 ..... OIL F- 10A 2000670 F-11A" '2000620 6~0 55'0 ' 510 p 4 ..... OIL F-i2 ' 17910~6' 650 ' '550 530 P P " 'Oi~ F-13A " 19~i'520 650i 550 " 530 P '"4 ..... OiL F-14 1800120 F-15 1811300 650 55'0 480! 3 P OIL F-16A 1961600 650 550 410 P P OIL F-lJA'" 1'~41630 ' 153 125 " 130 " P "P ...... OiL F_"i 9 1811060 ........ F-21 1890560 153 125 115 P 'P " 0IL F-22 1890620 '" 650 550, 0 2 P ' 'OIL F-23A 199'0740 153 125 ' 0 2 P ..... 0IL! F-24 1831540. F-26A ' 198i'890 ' ' ' F-27 ~ i861690~ ' ..................... F-28 1861590 F-29 1861330 F-30 18911 O0 F-31 1861570 650 550" 0 2 '" P ........ oiL F'32 '1890330 650 550 530 "P- P ....... OILI F-33 1960030 F"3~4A 1961090 ............... F-35 1880810 650 550 ,i80 P "P ........ OIL F-36 1951960 ' 153 ' 125 O ' '2 P ' ' ' OIL F-37 1890990 650 ' '550 530~' 'P P ' ' OIL , RJF 1/16/01 Page 1 of 2 SVS PBU F Pad 3-27-01 JJ1 Well Pe~it ~ Separ Set L~ Test T~t T~t Date oik WAG, G~J, ~umbe~ Number PSI, PSI, ,Trip, Code ,Code Code ,pgs~ed aASor~r F-38 19013~0' F-39 1901410 153 125 115 P ' P ' ' 0IL~ F'.40 1911170 ~50 550 ~50: ' 'P P ....... ~IL F-41 1911040' 650 550 490' P P OIL , . , t . F-42 1901580 650 550 530 P P ~, OIL , . , , F-43 1910750 153 ' 125~ ~0~ 1 P ' 0IL F-44" 1910080 .... ' '' '' 9 0280 F-46 1901780 650 5501 440' 3 P 0IL F-47A 2000~50 Wells: 24 Components: 48 Failures: 13 Failure Rate: 27.08o,,{[~] 90 Day Remarks: F-l, F-15 shut-in, operator reports that all other failures repaired and Passed retest. · RJF 1/16/01 Page 2 of 2 SVS PBU F Pad 3-27-01 JJ1 MEMORANDUM State of AlaSka Alaska Oil and Gas Conservation Commission TO: Julie Heusser, ~' DATE: Commissioner THRU: Tom Maunder,. ~~r~o~~ P. I. Supervisor '~.~-~ ,~ December 7, 2000 FROM: Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit BPX / F-Pad Thursday, December 7, 2000: I traveled to BPX's F-Pad in the Prudhoe Bay Field to witness 'Safety Valve System tests. Merv Liddelow, BPX representative in charge of testing, performed the tests in a safe and proficient manner. 'Of the-28 wells tested, 10 failures were witnessed. For the most part, froZen contaminants (.w. ater) in the block valves upstream of the pilots and in the SSV hydraulic control, lines caused the failures. On 12/8/00 Mr. 'Liddelow indicated to me th,.a.t aii.SVS failures had been correcte~.and. successfully re-tested. The 17.8% SVS failure rate requires a 90-day test cycle for this pad. The AOGCC test report is attached for reference. ! conducted 28 well house inspections concurrent with the SVS tests.. Due to recent high winds, several well houses .were drifted with snow inside. In addition, SVS hydraulic fluid leaks were noted on wells F-12 and F-13A. Mr. Liddelow indicated that these items would be addressed. No other exceptions were noted. SUMMARY: I witnessed SVS tests and conducted well houSe inspections on BPX's F-Pad in the Prudhoe Bay Field. 17.8% failure rate = 90 day test cycle. 28 wells, 56 components tested. 10 fail_ures. 17.8% failure rate. 28 well house inspections conducted. Attachments: SVS PBU FPad 12-7-00 JJ CC,' NON-CONFIDENTIAL SVS PBU F Pad 12-7-00 JJ.doc operator: B?X Operator Rep:. Merv Liddelow AOGCC Rep: Jeff Jones Alaska Oil and Gas ConSerVation Commission Safety Valve System Test Report Submitted· By: Jeff Jones Field/Unit~ad: PBF/PBU/F Pad SeparatOr psi: 'LPS 156 Date: 12/7/00 HPS 828 Well ' Permit Separ · Set L/P Test . Test Test Date oil, WAG, GINJ, Number Number PSI PSI "Trip · Code Code Code ~assed GAS pr CYCbr F-01 . 1700460 828 550 525 PP OIL , ,! F-p2 828 sso P ,, , F-03 -i'700580 . · F-04 · 1710'020 156 ...125 125' P P OIL~ F-05 1'710090 . .. , F-.06 1710120 · ,,, F.07 · 1720230 . F'08 1740110 . .- ~ , , F-09 1790760' . . .' . · , F,.10A 2000670' F-11A 2000620 ~ 828 550 500 P P OIL · , F-12 1791070 828 550 "550 P P . .. OIL F-13A 1961520 828 550 525 P.' P OIL tF-14 -1800120 F-15 1811300 828 ' 550 490 P P OIL F-16A". 1.961'600 156 . '125 '0 1P ' ' OIL F-I7A 1941630 156 125 130 P p oil F-19 1811060 ' · . ~ , F,21 1890560 156 125 125 P P OIL F-22 1890620 156 125 125 P' P OIL F-23A · 1990740 '156 125 125 P P " OIL F,24 1831540 ~ .. ' F~26A 1981890 156 125 '. 1251 P 4 OIL F,27 1861690 828 550 ' O' 1 P ' ' OIL F-28 1861590 828 550 500 .P P OIL F-29 1861330 '828 '.~50~ '5~0 : 3 4 OIL F,30 1891100 ' ' F-31' ' 1861570 F-32 1890330 828 5501 520 . P P OIL ,'', , , ,, F-33 - 1960030 F-34A . ~1961090 ' ' F-35 1880810 828 ' 550 '525 .P P OIL · · F-36 '1951960 828[ '550 0 2 . P . OIL , F-37 1890990 828 550 '5'50 · P P OIL , ~amt~ Paee 1 of 2 SVS PBU F Pad 12-7-00 JJ.xls 'L/P 'Test Test Test Date Well Permit 'Separ Set L Oil, WAG, GINJ, Number Number ~ PSI PSI . Trip· Code Code Code Passed GAS or ~¥CLE F-38 .1901350 · · ' ' F-39 1901410 · 1'56 125 125 .'P P OIL F-40 1911170 828 550.' 0 1 5 OIL fi-n1 ' 1911040 '~28 · 550 530 P P ..... OIL F-42 .1901580 . F-43 1910750 156 '125 125 P P ' oIL F-44 1910080 · ~-45 1910280 '828 550 0 1. P OIL F-46 1901780 828 550 ""50' . 3 P ' ' OIL F-47A 2000350 156 125 130 'P" 'P OIL F-48 · 1910860 .' 156 125 100' P P OIL · . . . · Wells: 28 COmponents: Failure Rate: 17.8°/dZloo ray 56 Failures: 10 Remarks: 12/13/00 Page 2 of 2 SVS PBU F Pad 12-7-00 JJ.xls ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT C SUNDRY WELL OPE"" TIONS 1.' Operations performed: Operation shutdown__ Stimulate__ Plugging__ Pull tubing__ Alter casing __ Repair well_ Perforate X Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora_ae, Alaska 99519-6612 4. Location of well at surface 2108' NSL, 2392' EWL, SEC. 02, T11N, R13E, UPM At top of productive interval 1414' SNL, 1854' EWL, SEC. 11, T11N, R13E, UPM At effective depth 1794' NSL, 1390' EWL, SEC. 11, T11N, R13E, UPM At total depth 1810' SNL, 1319' EWL, SEC. 11, T11N, R13E, UPM 5. Type of Well: Development __ Exploratory __ Stratigraphic __ Service __ 6. Datum elevation (DF or KB) KBE = 56.74 AMSL 7. Unit or Property name Prudhoe Bay Unit 8. Well number F-02 (22-11-11-13) PBU 9. Permit number/approval number 70-56 / 10. APl number 50- 029-20084 11. Field/Pool Prudhoe Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10940 BKB 9306 10817 BKB 9223 feet feet feet feet Plugs (measured) Junk (measured) Fish (WD packer) @ 10817' MD Casing Length Size Structural ._ Conductor 95 30 Surface 2302 20 Intermediate 9283 9 5/8 Production .. Liner 2126 7 Perforation depth: measured 10394'- 10414', 10506'- 10526' 1fl.'~74'- 1~.'~.q4'_ true vertical subsea 8880'- 8972' (two intervals) Cemented Measured depth True vertical depth BKB 250 sx 114 114 4 700 sx 2321 2321 4282 sx 9302 8136 500 sx 8802-10928 7749-9298 Sqzd: 10276'-10306', 10315'- 10358', Tubing (size, grade, and measured depth)5 1/2" L-80 to 8574' with 4 1/2" tailpipe to 8703' Packers and SSSV (type and measured depth)9 5/8" BOT 3H packer at 8574'; 5 1/2" SSSV at 2149' 13. Stimulation or cement squeeze summarysee attachment Intervals treated (measured) Treatment description including volumes used and final pressure O IelivAL ~ ~ ,,, K L' IVED NOV 12 1999 14. Representative Daily Average Production or Injection Data ,~ ~u~i0r~gO Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 5950 22324 0 0 1984 Subsequentto operation 1340 785 0 0 2O8 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas__ Suspended 7. I hereby ce~ify that the fj;~..~oing is true ~d correct to the best of my knowledge. Signe~Z ,~,~?~,~ ~.,~/.~~"'~~-~-'~ Title Technical Assistant IV Form 10-404 R~v-O'6/~'~88 -~ - Service Date ~///~~~ SUBMIT IN DUPLICAte, F-02 DESCRIPTION OF WORK COMPLETED ADDPERF 05/01/99 SUMMARY The following additional interval were perforated using 2 7/8" guns, 6 SPF, random orientation and 60° phasing. 10,197- 10,200 MD F-02 DESCRIPTION OF WORK COMPLETED ADDPERF 07/14/99 SUMMARY The following additional interval were perforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 10,188- 10,192 MD RECEIVED f.;OV 12 lggg Alalka 0il & Gas Cons. Commi~n Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001'..PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 28 March 1996 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL , ~ ~- ~ ? x-04 (43-06-i0-i4) ~--/~ ~-~ (i~-~-ii-i4) ~1'130 z-i5 DESCRIPTION PFC/PERF FINAL BL+RF PDK FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF PFC/PERF FINAL BL+RF CN FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 3771.08 5630.02 5634.02 5753.08 5808.06 5852.04 5855.06 6460.02 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Ax AnChorage, AK 99518 to (907) 563-7803 Received by: Date: APR 09 199~ ~I & Gas Cons. Commission Anchorage LARRY GPJUNT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 January 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PiS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PiS FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC NO. Run ~ 1 3562.02 Run ~ 1 4060.05 Run ~ 1 5798.13 Run # 1 5852.03 Run ~ 1 6560.01 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201  Anchorage, AK 99518 d~ to (907) 563-7803 Gas Con~. Co~rnis~ion Received by: Dat LARRY GR3kNT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 11 January 1996 Transmittal of Data ECC #: 5852.02 Sent by: HAND CARRY Data: LDWG Dear Sir/Madam, Reference: BP -'' F-02 ~ PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE+LIS Run # 1 Received by: Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 to (907) LARRY GRANT ' Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 26 December 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION i'PLS'FINAL.BL+RF' ECC No. Run #. 1 5611,06 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 ~~ ~(907)563-7803 D'~? Oil ~ ~ Co~. ~mm,o~,on ~eceive~ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 30 January 1995 RE: Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL #DESCRIPTION F F-05 (14-36-12-13) 6 1 PLS/STATIC FNL BL+RF 1 PLS/STATIC FNL BL+RF 1 PLS/STATIC FNL BL+RF ECC No. Run # 1 2577.06 Run # 1 5852.01 Run # 1 6353.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: ?lease s:i~n and ret~:r-n to: ECEIVED Petreteeb~ica! D~ta Center FEB 0 2 ~995 BP ~.~.:::,~u~: .... · 'A~ ~=ka) Inc . *- -.. ~ : ~ -' Anchorage Received by -- BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 // DATE: 01-15-93 T# 84251 BP CH LOGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at A-17 ~o ' I%~ INJ 01/06/93 #1 lA-24~Z.~O CNA 01/03/93 #1 A-24 GR 01/05/93 #1 D-04A~'I~PRODUCTION LOG 01/07/93 #1 D-05 ~e-~ PRODUCTION LOG 01/07/93 #1 D-26 ~6-1~_ PRODUCTION LOG 01/05/93 #1 F-02 7,~$~ pRoDuCTION LOG 01/07/93 #1 PRODUCTION 01/0 /93 #1 F-13 ~e--6 PRODUCTION LOG 01/08/93 #1 M-19A~'I~CL 01/07/93 #1 X-04 7~-~ PRODUCTION LOG 01/09/93 #1 X-14A~'I~cL 01/09/93 #1 X-27~-~ PRODUCTION LOG 01/08/93 #1 Information Control Well Records below. If you have any (907) 564-4004. 9700.00-10750.00 ATLAS 5 " 10600.00-11355.00 ATLAS 5 " 10800.00-11350.00 ATLAS 5 " 10200.00-10700.00 ATLAS 5 " 10400.00-10729.00 ATLAS 5 " 9700.00-10925.00 ATLAS 5 " 10100.00-10600.00 ATLAS 5 " 9650.00- 9970.00 ATLAS 5 " 8960.00- 9198.00 ATLAS 5 " 8950.00- 9120.00 ATLAS 5 " 9250.00- 9850.00 ATLAS 5 " 9990.00-10230.00 ATLAS 5 " 11300.00-11600.00 ATLAS 5 " /, CEIVED JAN 2 6 199 Alaska 0ii & Gas Cons. Commi$sioll Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 03/12/90 Transmittal: 80967 From: Information Control Well Records LR2'I Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. C-07, CCL.-C ~ 03/04/90 ~.1 9500-11440 Atlas 5" D-21' Gas Lift Surv 02/24/90 ~1 1000-9700 Camco 1"/5" E-10. Prod-F 02/22/90 #1 11400-11680 Camco 5" F-02, Prod-F 02/21/90 ~1 10150-10799 Cam~o 5" F-Ill Prod-F 02/21/90 #1 9300-9550 Camco 5" G-05. Prod-F 02/20/90 #1 10800-11145 Camco 5" H-16. Prod-F 02/25/90 #1 9850-10150 Camco 5" J-10~ Prod-F 02/23/90 #1 9100-9640 Camco 5" J-27, Prod,F 02/26/90 #1 9234-9530 Camco 5" N-15' Prod-F 2/20/90 ~1 9700-10000 Camco 5" U-II 4-Arm Caliper 03/07/90 ~1 9900-10030 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR ARCHIVES ! h 990 Alaska Oil & Gas Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561.5111 To: Distribution From: Subject: I'nformation Control Well Records LR2-1 BP CASED HOLE FINAL LOGS Date: 08/17/89 Transmittal:80272 Enclosed is your copy of the material listed below. If you have any questions, please contact us at (907)564-4445. A-22 PROD-F 08-01-89 ~1 11300-11792 Camco 5" C-04 CCL 08-03/04-89 ~1 9400-10688 Camco 5" F-02 TEMP/FM 08-06-89 ~1 8600-10600 Camco 5" W-03 CCL 08-03-89 %1 9000-9800 Camco 5" Y-10 GAS LiFT 08-06-89 ~1 500-9800 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCE HOUSTON MOBIL PHILLIPS RESERVOIR ' -~--~,, STATE OF ALASKA' ARCHIVES BP EXPLORATION ORIGINAL BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 14, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well F-2 (22-11-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. Yours very truly, JAM: JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File STATE OF ALASKA . iSKA OIL AND GAS CONSERVATION COMMI,~ _,ON REPORT OF SUNDRY WELL OPERATIONS Plugging Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2108' NSL, 2392' EWL, SEC. 02, T11N, R13E, UPM At top of productive interval 1414' SNL, 1854' EWL, SEC,. 11, T11N, R13E, UPM At effective depth 1794' NSL, 1390' EWL, SEC. 11, T11N, R13E, UPM At total depth 1810'SNL, 1319'EWL, SEC. 11, T11N, R13E, UPM 12. Present well COndition summary Total depth: measured 10940feet true vertical BKB 9306feet Stimulate Alter casing Perforate Other X 6. Datum elevation (DF or KB) KBE , 56.74 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number F-02 (22-11-11-13) PBU 9. Permit number/approval number 70-56 / 9-182 10. APl number 50- 029-20084 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 10817feet true vertical BKB 9223feet Junk (measured) Fish (WD packer) @ 10817' MD Casing Length Size Structural -- Conductor 95 30 Surface 2302 20 Intermediate 9283 9 5/8 Production -- Liner 2126 7 Perforation depth: measured 10394'-10414; 10506'-10526' Cemented Measured depth 250 sx 114 4700 sx 2321 4282 sx 9302 500 sx True vertical depth BKB 114 2321 8136 8802-10928 7749-9298 Sqzd: 10276'-10306', 10315'-10358', 10374'-10394', 10430'-10442', 10452'-10470' true vertical subsea 8880'- 8972' (two intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8574' with 4 1/2" tailpipe to 8703' Packers and SSSV (type and measured depth) 95/8"BOT3Hpackerat8574';5 1/2" SSSV at 2149' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) 14. Treatment description including volumes used and final pressure Jx;l;~$ka 0il & Gas Cons, Reoresentative Daily Averaoe Production or Injection Data - OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 5950 22324 0 0 1984 Subsequent to operation 1340 785 0 0 15. Attachments I Copies of Logs and Surveys run I Daily Report of Well Operations X 17. I hereby certify that the for .egoing is true and correct to the best of my knowledge. Signed ,,(~~[.J~ ~~X"~3~ Title Manager Production Engineering Form 1,~'-~4 Rev 06/15/88 16. Status of well classification as: Oil X Gas Suspended Service 208 SUBMIT IN DUPLICATE' WELL F-2 (22-11.11-13~ PBU CTU CEMENT SOUEEZE OPERATIONS A coiled tubing cement squeeze of existing perforations was performed as follows: 4/13/89 4/27/89 4/29/89 5/1/89 Rigged up coiled tubing unit and pressure tested to 4000 psi. Performed a perforation acid wash, then cement squeezed all perforations. Performed inflow test; squeeze good. Rigged up Dresser Atlas and perforated the following intervals using 3 3/8" Jumbo-Jet carrier guns at 4 spf: Reperf 10394' - 10414' MD BKB Add perf 10506' - 10526' MD BKB Performed nitrogen lift; returned well to production and tested. jam 8/4/89 BP EXPLORATION REFERENCE: lwOUSTON ARCO CHEVRON EXXON TEXAuO MOBIL PHILLIPS STATE OF ALASKA , GEOSCIENCES RESERVOIR ARCHIVES BP'CASED HOLE FINAL LOGS BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907} 561-5111 Date: 05-02-89 T~: 80024 ,, , The following material is being submlt-~ed herewith. Please acknowledge receipt by slgnlng a copy of this le~er and returning Itt o this office: F-02 . CCL 04-29-89 #1 8450-10769 Atlas 5" M-17 CCL 04-28-89 #1 10900-11300 Atlas 5"' X-12 CCL 04-27-89 #1 8900-9631 Atlas 5" Received Shirley R. McCurry - I NFO~T I ON CON~ Date : We I I Records L~-i i BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 7, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well'F'2 (22-11-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. J. Bragg A. Manager Production Engineering JAB:JAM Enclosures (9) cc: L. Burke (MB12-1) Well File STATE OF ALASKA '~'~'~ AI.~KA OIL AND GAS CONSERVATION COMMISo,ON r I UI ATION FOR SUNDRY AI J3. LS i Abandon, ., Suspend Operation Shutdown .,, Re-enter suspended well Alter casing .. Repair well Plugging "' Time extension stimulate . . Change approved program , Pull tubing Vartanoe Perforate 0the~ X 2. Name of Operator BP Exploration (Alaska) Inc. . 3. Address P. O. Box 196612, Anchorage, Alaska 99519.6612 ~. Location of well at surface 2108' NSL, 2392' EWL, SEC. 02, T11N, R13E, UPM At top of productive interval 1414' SNL, 1854' EWL, SEC. 11, T11N, R13E, UPM At effective depth 1794' NSL, 1390' EWL, SEC. 11, T11N, R13E, UPM At total depth 1810'SNL, 1319'EWL, SEC. 11, T11N, RI3E, UPM 12. Present well condition summary Total depth: measured 10940 feet true vertical BKB 9306 feet 5. Type of Well:' Development Exploratory Stratigraphio Service i Plugs (measured) Datum elevation (DF or KB) KBE = 56.74 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number F-02 (22-11-11-13) PBU 9. Permit number 70.56 10. APl number 50- 029.20084 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 10817 feet true vertical BKB 9223 feet Junk (measured) Fish (WD packer) @ 10817'MD Casing Length Size Cemented Measured depth Structural -- Conductor 95 30 250 sx 114 Surface 2302 20 4700 sx 2321 Intermediate 9283 9 5/8 4282 sx 9302 Production -- Liner 2126 7 500 sx 8802-10928 Perforation depth: measured 10276'-10306', 10315'-10358', 10374'-10414', 10430'-10442', 10452'-10470' true vertical subsea . 8797.8932' (five intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8574' with 4 1/2" tailpipe to 8703' Packers and SSSV (type and measured depth) 9 5/8" BOT 3H packer at 8574'; 5 1/2" SSSV at 2149' 13. Attachments ' Descriptio'n summary of proposal .. Detail~l operations'program . True vertical depth BKB 114 2321 8136 7749-9298 RECEIVED ~;(daska Oil & Gas Cons. C0mmis BOP Sketch 14. E~timated date for commencing operation ' I 16. If proposal was verbally approved I Oil X Gas Name of approver Date approved Service "17. I hereby~rt'.ffy tha~ett~e foj;egoing is true and correct to the best of my knowledge. Signed ~ ~~le Mana~er P,roduction En~ ineerinfl. FOR COMMISSION USE ONLY Coni:iitions of approval: Notify Commission s°.representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- d-o4- OREilNA& SIGNED BY Approved by order of the CommissionLoNNfE C' SMITH Form 10-403 Rev 06/15/88 AK 3407-7 (1/89) 15. Status of well classification as: a, pproved Copy Returned / / Suspended .. . I °prova'"o. Commissioner SUBMIT IN TRIPLICATE STATE SUNDRY NOTICE Well F.02 Well F-02 needs a GSO cement squeeze with coiled tubing. The program involves squeezing all perforations followed by reperforation. A summary of the planned procedure is as follows: 1. MIRU coiled tubing unit. Acid wash the perforations. Liquid pack the well and cool the reservoir. Jet with surfactant to cleanse the perfs of oil carry over. Cement squeeze ali perforations up to 3500 psi differential, Reverse out cement after holding squeeze for 30 to 40 minutes. Reverse in nitrogen blanket for freeze protection. 'Leave well with WHP sufficient to maintain 500 to 1000 psi positive differential at perforations for WOO period. Inflow test well by releasing trapped nitrogen blanket. Resqueeze well if test shows inflow. If no inflow is observed then reperforate 10394'-10414' and 10506'-10526'MD BKB ( BHCS 12/6/'70) and return well to production. , . , , , o 10. 11. PRH.3/7/89 Coiled Tubing Blow-Out-Preventers Celled Tub inq · , Pack-Of} · ~ Blind Rams ~, ' Cutter Rams Chk:k:san (Kill Line) Slips Pipe Rams .Pump-In Sub ~ (Circulate/Re turn $) W eli Head Swab Valve W-36 H-5 F-02 Slanda~d Alaska P~oduct~on 900 Ea. Ben%on BOut P,O. ~, 196612 Anchoroge. (90~1 564-51 I I HOUSTON ARCO CHEVRON EXC~ON TEXACO TO: MO B IL PHILLIPS STATE OF ALASKA GEOSC IENCES RES ERVO IR REFERENCE: ARCHIVES SAPC EASED HOLE FINAL LOGS INDEXED ,,, S-FANDARD ALASF/~. PP, ODUCTION Date: 11-04-88 r#: 79496 The following material Is being submitted herewith. signing a copy of this letter and returning it to this office: Please acknowledge receipt by PROD-F 10-22-88 ~1 9400-9710 5" PROD-F A 11 10-23-88 /;1 11200-11558 5" INJ-F ~ 10-16-88 f/1 9800-10400 5" PROD-F 10-21-88 f/1 10060-10610 5" Received Lois Arnold INFORMATION CONTRC~_ Date Well Records LR2-1 A un'! Ol lhe O~'ig,nol 5'ondo.d 0,1 Founded ,n Cle-elond. Ofl,o. ,n 1810 Standa,d Alaska . P~o~ucfion Company 900 EO¢ ~n~on P,O. fi, o,, An(homage. AIo~ko TO: REFERENCE: HOUSTO:,' ARCO CHEVRON E~XON TEXACO biOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS INDEX£D STANDARD ,'~. I.,,-.,..).'" c:..-..,..,', t')R© Di..,i[ Ti 0 h t. Date: 10-31-88 TI: 79483 B-09 "~ c-J5 ~ C-30 '~F-02 -"G-02 '-'" H-08 '~ W-29. ~'~ W-42 'J Z-20 ~ Z.i20 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: FBS/IN$ 10-25-88 #3 9550-9923 Sch 5" CNL/GR (2.5" Tool) 10-24-88 #4 9000-9757 Sch 5" CNL 10-22-88 #1 8750-9701 Sch 5" PROD 10-23-88 #1 10150-10600 Sch 5" CCL/PERF 10-24-88 #1 8820-9400 Sch 5" CNL 10-23-88 #5 8868-9423 Sch 5" PROD 10-24-88 #1 10550-10895 Sch 5" HP-PRESS Fall-off 10-21-88 #1 9600-9600 Sch CBT 10-22-88 #1 10265-11518 Sch 5" CET 10-22-88 #1 10265-11540 Sch 5" Race i ved Oil .& Gas Cons. ,,: ~nchomg~ Aume o! the o,,<:jmol Smndu,d (~1 Co.-i:xn'~ Founded ,n Cle-elond. 0~,o. ,n 1870 Shirley R. McCurry I NFORMAT I ON CONTROL Wel I Records LR2-1 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111 "C"STREET ANCHORAGE. ALASKA TELEPHONE 19071 265-0000 MAIL': POUCH 6-612 ANCHORAGE, ALASKA 99502 ~o~ SFO/UNIT/STATE: (-Marathon) GETTY MOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) Da t e: 0 P-27-84 Trans. [!: CC//: 75076 REFERENCE: SOHI.~O~F'INAL DATA - PRESSURE SURVEY DATA /~ollowing material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- E-18 F_2~. F_2~-~ G-3 j H_8j' N-13 S_2/' $-9 '/ S-ll / S-13.~' S-14:-' Getty St. PBU & PBU Data Sheet PBU Data Sheet Flowing Gradient PBU & PBU Data Sheet Static Gradient PBU & PBU Data Sheet Static Gradient STatic Gradient Static Gradient Static Gradient Static Gradient Static Gradient 1-12-84 Camco 1-20-84 1-19-84 Otis 1-30-84 GO 1-30-84 Otis 1-25-84 GO 1-28-84 GO 2-1-84 Otis 1-20-84 GO 1-21-84 Camco 1-20-84 GO 1-28-84 Otis (4/82) DATE Development. Oeo] oEy .__ ~9 . ;:'-~'; ......... ~Jell Records ., .. SOHIO ALASKA PETROLEUM COMPANY 3111 "C"STREET SFO ARCO CHEVRON EXXON ANCHORAGE. ALASKA TELEPHONE {907l 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 TO: SFO/UNIT/STATE: (-Marathon) GETTY MOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only) Date: 2-24-84 CCI/: 75063 REFERENCE: ~0 CASED HOLE FINAL LOGS jThe following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/L~qIT/STATE: A-21 C-14/ C-26 ~ E-18/ F-2 / N-13~ F-24J H_16/' Spinner 12-5-83 #1 11200-11550 Camco 5" Spinner 2-09-84 #1 11550-11877 Otis 5" Spinner 12-9-83 #1 11300-11800 Camco 5" Spinner 1-12-84 #1 10800-11170 Camco 5" Spinner 1-19-84 #1 10200-10600 Otis 5" Continuous Flow Survey 1-23-84 #1 9550-9850 GO 5" Gyro Cont. Tool 11-16-83 #1 37.7-12325 Sch 1" EPL 10-128-83 #3 9850-10554 Sch 5" RECEIVED ........ (4/82) · '. Development Geology ........... Well Records SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 November 10, 1983 Alaska Oil & Gas Conservation Co~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WELL F-2 (22-11-11-13) PBU Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This subsequent report completes the workover of this well as proposed in Sundry Notice dated 10/10/83. Very truly yours, RHR: MCM: ckg encs cc: Well File 917 Geology Alaska 0it & Gas Cons, t;ommissior~ Anchora§e STATE OF ALASKA ALASKA UlL AND GAS CONSERVATION CO,v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator Sohio Alaska Petroleum Cc~pany 3. Address Pouch 6-612, Anchoraqe, Alaska 99502 4. Location of Well At surface: 3172' SNL, 2888' WEL, Sec. 02, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 56.74' ~L I 6 . Lease Designation and Serial No. ADL 28280 7. Permit No. .70-56 8, APl Number 50- 029-20084 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number F-2 (22-11-11-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made Q[ Other [] [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following work waS performed on Well F-2; . . 6. 7. 8. Killed well. Installed BPV. Moved in rig, Removed tree. Installed and tested 13 5/8" -50005 BOPE. Pulled 10 3/4" x 7''1 Thermocase and 7" tubing.. Tested 9 5/8"/13 3/8'" casing to 2500' psig. Ran a 13 3/8" .x 9 5/8" liner-packer on 9 5/8'" casing to the 13 3/8" x 9 5/8" X/O at 2550'. Pumped Arctic Pack followed by. 50 sx Arcticset cement into 9 5/8" x 13 3/8" annulus, bringing Arctic Pack to surface; set liner slips, packing element and landed 9 5/8'" at surface. Drilled out 9 5/8" liner packer; pressure tested to 3000 psi. Milled 7" packer at 9740" and pushed to T~D.: - 10817' Ran 5 1/2"' tubing cQmpletion. Set 9 5/8" production ~cker at 8574~. SSSV at 2149' Installed BPV. R~moved BOPE.. Installed and tested tree. Moved rig off. This work was completed on October 25, 1983.. Signed U_ ~ ~,~ ~~~~-~Title District Drilling Engineer The space below for Commission use I~. H., Reiley ~ Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ~ STATE OF ALASKA ALASK~ ,L AN D GAS CONSERVATION C ~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator Sohio Alaska Petroleum Ccmpany 3. Address Pouch 6-612, Anchorage, Alaska 4. Location of Well At surface: 99502 7. Permit No. 70-56 8. APl Number 50- 029--20084 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 3172' SNL, 2888' WEL, Sec. 02, TllN, R13E, UPM F-2 (22-11-11-13) 11. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prud.~)e Oil KBE = 56.74' AF[qL I ADL 28280 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [-'] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [~ Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following work was performed on Well F-2; 1. Killed well. Installed BPV. Moved in rig. Removed tree. Installed and tested 13 5/8" -5000# BOPE. 2. Pulled 10 3/4" x 7" Thermocase and 7"' tubing. 3. Tested 9 5/8"/13 3/8" casing to 2500 psig. 4. Ran a 13 3/8" x 9 5/8" liner-packer on 9 5/8" casing to the 13 3/8" x 9 5/8" X/O at 2550'. Pumped Arctic Pack followed .by, 50 sx Arcticset cement into 9 5/8" x 13 3/8" annulus, bringing Arctic Pack to surface; set liner slips, packing element and landed 9 5/8" at surface. 5. Drilled out 9 5/8" liner packer; pressure tested to 3000 psi. 6. Milled 7" packer at 9740~ an~ pushed to T..D.. - 10817'. 7. Ran 5 1/2" tub~ completion.. Set 9 5/8" production packer at 8574~. SSSV at 2149 8. Installed BPV. Pcz~oved BOPE.. Installed and tested tree, Yk)ved rig off. · This work was ccm~pleted on October 25, 1983, ~ ~,i~,%~ . ~~'~: ~ ~ ~, 14. I hereby certif~g 'ng' e/~ and cor~:t to the best of my knowledge. Signed Title Dis~.r~.c~ Dr~]_l~c_[ En~in~_,.r The space below for Commission use Ro. Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate Form 10-403 Rev. 7-1-80 and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 October 10, 1983 Alaska Oil & Gas Conservation Co~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WELL F-2 (22-11-11-13) PBU Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This gives notice of intention to repair the well. Very truly yours, RHR: MCM: ckg encs cc: Well File #17 Alaska 0il & Gas Cons, Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COivlMISSION SUNDRY NOTICES AND REPORTS ON WELLS OTHER 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator Sohio AlaSka Petroleum Ccmpany 7. Permit No. 70-56 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of Well At Surface: 3172'-S~; 2288' WEL, Sec. 02, TllN, R13E, UP~O$o~.~. 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 56.74' AMSL ] ADL 28280 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data [] [] [] 8. APl Number 50- 029-20084 9, Unit or Lease Name Prudhoe Bay Unit 10. Well Number F-2 (22-11-11-13) PBU 11. Field and Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well ~ Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following work is proposed for Well F-2 to repair casing cc~m~nication between the inner and outer annuli, tie-back the 9 5/8" csg. to surface, and run a new 5 1/2" tbg. completion. ® 9. 10. 1. Install and test 13 5/8" - 5000 psi BOPE. 2. Pull 10 3/4" x 7" Thermocase and 7" tubing. 3. Mill and recover 7" packer/tailpipe assembly at 9740'. 4. Clean out to PBTD. 5. Test 9 5/8" x 13 3/8" caSing. Isolate and repair casing c~cation as required. 6. Run a 13 3/8" x 9 5/8" liner-packer on 9 5/8" casing to the 13 3/8" x 9 5/8" X/O at 2250 ' . 7. Pump Arctic Pack followed by 50 sx Arcticset cement into 9 5/8" x 13 3/8" annulus, bringing Arctic Pack to surface; set liner Slips, packing element and land 9 5/8" at surface. Drill out 9 5/8" liner packer; pressure test to 3000 psi. Run tubing completion with 9 5/8" production packer and 5 1/2" tubing to surface. Install and test tree; put well on production. This work is schedule to crmm~nce about October 15, 1983. District Drilling EngiD~er Tide Signed The space below for Commission use R. ~J~i~-- ~ile~ Conditions of Approval, if any: . " ~., ORIGiNAl. SIGNED BY LONNIE C. SMITll ey Order of Approved by ~ COMMISSIONER the Commission Date I0 Approved C~py R, etur,ne~ / i':id .. Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Indexed SOHIO RESTRICTED SOHIO ALASKA P£TROLEUM COMPANY ARCO = -_. ..... ~ _ , , 1, , TO: ' SF0/UNIT/STATE ~ ,, - .... _ _ ii i j I ~PA~ Tra, Bsm,i~,,ta,1 9nl~ - _ 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 3/12/82 #1427 REFERENCE: · 0 FINAL DATA The following material is being Submitted'herewith. Please acknowledge receipt by signing a copy of this letter and returning it to'this office:- SFO/UNIT/STATE: PRESSURE SURVEY F-2 Pressure Survey & BHPD 3/1/82 (Sch) .~c.,v~¢_/..."~ ' I~, --"- ' ' . AR 1 5 1982 DaTE ____ :9 -~IidoI 0{! & Gas Co~is. Commi~ion ~chorage er Geology s .~ n d e:: ed C.~v~ TELEPHtsNE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 TO: SFO/UNIT/STATE- Mo~] -- I ll -- (-Marathon) P~ai]]Jp~ BP/dE Transmittal Onlv _ /./ Date: 2/17/82 # 1379 A REFERENCE: SOHIO FINAL DAT~ CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/UNIT/STATE' (-Marathon) D-3 CNL-CH(2 314" Tool) ¥/2 12/11/81 :.9830-10593' D-6 Spinner ~/-- 1/31/82 9000-9350 D-16 Temp. Survey ~/3 runs 1/12/82 7100-8882 F-19 Radioactivity Log/GR ¥/1 1/27/82 12350-12800 G-5 Spinner ~/1 1/14/82 10700-11130 H-2 Spinner, CFS ~/2 1/10/82 8650-9100 H-7 Spinner f/-- 1/21/82 10450-10900 J-1 CNL-CH(2 3/4" Tool) [/3 12/22/81 8300-9136 J-5 CNL-CH //8 12/19/81 9400-10364 J-8 CNL-CH 1/1 12/20/81 11450-12392 R-1 Spinner _ .~/2 1/1/82 8850-9250 Q-3 CNL-CH 4/3 12/18/81 8600-9432 B-14 CNL-CH(2 3./4" Tool) ~/1 12/28/81 11100-12037 C-7 CNL-CH(2 3/4" Too!) ~/1 12/29/81 10900-11719 D-1 CNL-CH ~/2 12/26/81 9100-9817 D-4 CNL-CH ~/4 12/27/81 9900-10892 ~ ~F-2 CNL-CH ~J2 12/23/81 9800-10831 F-3 CNL-CH(2 3/4" Tool) ~t7 12/28/81 10350-11202 F-4 CNL-CH(Limestone 3 3/8) ./'/8 1/10/82 9700-10562 .,:~,,.,...,-,, .: } · ...~ P"~' ,/~ >} - , '... , .. ~.,., - . (Sch) 5" (Otis) 5" (Camco) 5" (Camco) 5" (Otis) 5" (Go) 5" (Otis) 5" (Sch) 5" (Sch) 5" (Sch) 5" (Otis) 5" (Sch) 5" (sch) 5" (Sch) 5" (Sch) 5" (Sch) 5" (Sch) 5" (Sch) 5" (Sch) 5" Carol ...-~ i -~ t e r (Con' t Bev?~.~.{~,Ic.~+~r.t Oeolo.~y '.':e !\"_, \\ ~d T:: : i £ SOHIOALASK. "ETROLEUM COM?AN¥ SOHIO RESTRICT.ED 311 1 "C" SIREET ANCHORAGE, ALASKA ]ELEPHONE 1907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO? EXXON' ~' Dafie:. 1/14/'~...# 1320 Page I of 2 PHILLIPS SFO ' REFERENCE: T SOHIO MAGNETIC LIS TTLPES & LISTINGS ........... he folio'wing material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this. office:-- SOHIO-MAGNETIC LIS TAPES AND LISTINGS ON THE FOLLOWING WELLS: * m-19~ (S,c,h) ' * B-8 ' * D- " ' OH-'DIL/BHC/FDC/CNLf #62422 ;' ~ ' ' 12/21/81 CH-CNn #62356 12/21/81 CH-CNn #62436 12/26/81 * D-3/' " CH-CNn #62367 12/11/81 * D-4 ~/ " CN-CNL #62437 12/27/81 '* E- 20''" " OH-DIL/BHC/FDC/CNn #62366 12/12/81 / * E-21~/" OH-DIL/BHC/FDC/CNL #62332 11/19/81 * 'F-2/ " CH-CNn '- #62440 12/23/81 *"F'16 ~/ " OH-DIL/BHC~FDC/CNL #62423 12/22/81 / * J-l~/ " CH-cNn #62433 12/22/81 * ~-5/ " CH~CNL #62427 * J-8~/ " CH-CNn #62430 * M-13~/" CH-TDT #62455 * M-14~ " CH-TDT #62454 · 12/19/81 12/20/81 12/31/81 12/29/81 JAN 1 5. 1982 Carol ,9 Deve lopm~,nd~~y DATE Alaska 0il & Gas Cons. Commisslor! We 11 Recc Anchorag9 · · HQ 4-5 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 ~o: STATE Date: 8/27/81 # 1015 C SOHIO 'MAGNETIC LIS TAPE f~'/lhe following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- N-13 '"" Corrected LIS Tape & Listing N-11~ LIS Tape & Listing N-14 LIS Tape & Listing(Corrected) F-7./' LIS Tape & Listing Y-10 ~ LIS Tape & Listing G-13'~ LIS Tape & Listing Kuparuk' St.22-11-12 LIS Tape & Listing D-15~' LIS Tape & Listing R-9 LIS Tape & Listing Y-12/' LIS Tape & Listing J-13" LIS Tape & Listing F-2~ LIS Tape & Listing M-12 LIS Tape & Listing .. H-16/ LIS Tape &;'.Listing ': #61732 6/18/81 #2 #61776 5/9/81 #62007 7/7/81 #1 #62036 7/21/81 #4 #62042 7/18/81 gl #62043 7/23/81 #1 #62045 7/26/81 gl #62051 6/27/81 #2-" #62052 7/24/81 #1 #62055 7/25/81 #2 #62056 7/30/81 gl #62060 8/1/81 #1 #62071 7/31/81 #1 #62075 7/19/81 gl car~/~rieter - Deve±opment Geology Well Records, HQ 4-5 ARC(") MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 ¢o: SFO-/UNIT/STATE %A~:~l _ ' ..... - l~llil~ ......... -- (-Idarathon) t~AE _ , - : - · -- Date: 8/21/81 #1000 F REFERt~NCE: . The SOHIO FINAL DATACAsed hole final data following malerial is being' submitted herewith. Please acknowledge receip! by signing copy of this letter and reluming il t0 this office:-- B-14 1)-3 -.F-2 F-7 , J-13 %/ . TDT-M (Sch) 7/30/81 #1 Spinner (Camco) 7/7/81 #-- TDT-M (Sch) S/i/Si Ill TDT-M (Sch) 7721/81 #~ TDT-M (Sch) 7/30/8i Ill EPL (Sch) 8/3/81 #2 (Sch) 7/2i/81 #1 (Sch) 7/19/81 #1 Kuparuk St.)TDT~M 22-11-12 / )EPL 11 5" 5" _5" 5" 5" _~" 5" //- 1/ ,',r ,' ":IV r: i~ ;,. L f. ti) logy [[~_~Re co rd s {~~ SOHIO PETROLEUM COMPANY 3~" Division of Sohio Natural Resources Company ANCHORAGE~ TELEPHONE (9(~ SOHIO-BP ALASKA PRODUCTION DIVISION MAIL: POUCI~s~TAK, ~2T~E_C_.q ANCHORAGE, AL, .__~ TO: STATE OF AI~SKA 1/27/81 # ~Ii .F..~ REFERENCE: /Th DIRECTIONAL SURVEY DATA e following material is being submitted herewith. Please acknowledge receipt by signing a copy' of this letter and returning it to this office:- ~/~~~~~ Gyroscopic Survey Y-11 RD#1 Magnetic Single Shot-Survey /~'~ Y-11 Magnetic Single Shot Survey 1/lO/81 11/lO-12/7/8o lO/24-11/9/8o Carol Krieter Well Records DATE '~l-e~/~ 0il & Gas Oo~.s. O0mmission~ 9 ~ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 SFO/UNIT/STATE: REFERENCE: SOHIO FINAL DATA 1/29/81 #609 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- (23) 18-11-12 Mudlog 10/26.--12/11/80 .... , ....... (32) 30-11-13 - Mudlog 12/30-1/11/81 Bottom Hole Pressure Data Form & Survey (Go) " " " " " " (Go) Carol Krieter Well Records 1/25/81 1/18/8i RECEIVED RECEIVED DATE FEB - 2 1981 19 Alaska Oil & 6~s Cons. Commission Anchorage SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA REFERENCE: · DTi~CTIONAL SURVEY DATA he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- ,,~.?..~~F.~~~.. GyroscoPic Survey 1/10/81 ,' Y-Il RD#1 Magnetic Single Shot Survey 11/10-12/7/80 Y-11 Magnetic Single Shot Survey 10/24-11/9/80 Carol Krieter Well Records DATE SOHIO.PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION ARCO ' TO: EXXON PHILLIPS SFO REFERENCE: iMagnet ic Tapes ing material is being submitted herewith. Please acknowledge receipt by signing a s letter and returning it to this office:- C-3 Magnetic Tape 5/28/80 #1 #60547  " 6/5/80 #60575 - " 7/11/80 #1 & #2 #60662 X-10 " 7/25/80 #1 & #2 #60712 Krieter Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Compan~ SOHIO-BP ALASKA PRODUCTION DIVISION To:SFO/ID~IT/STATE 3111 ANCHORAGe, TE LE PHON E/(907 ) MA! L: POUCH ANCHORAGE, ALA. 6/30/80 : i -i 'co git : ---' "' ;"' ~'" ~'J-J-"~ES J 3 ,'.--NG ~ I :2 GEOL .. · #o J'. ~ GEOL ~r-'r-'jt ~STAT T~C- __l. STAT TEC I CONFER: FILF: REFERENCE: SOHIO FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- FO/UNIT/STATE C-16 ~CPL (Cyberlook) 6/7/80 '#1 5''''' C-16 ~-~qatural GR Spect. 6/7/80 #1 ~'2" & 5'~'~ C'16 DIL/SFL 5/22/80 a 6/7/80' #1 a 2 C-16 FDC/CNL 6/7/80 #1 ~2" & 5''~-~ C-16 FDC ..6/7/80 - #1 ~2" & 5"~ C-16 BHCS 6/7/80 #1 ~-~2" & 5"'-~ FO/UNIT/STATE -Harathon) CNL (CH)/.' 6/5/80 #1 5''-~''' Anne Barns Well Records REcEIvED DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION ~ ---- _ , ..... _ II I I i. IIi ~ ~ iJll .... -- TO: ' ~xxa~ ............ /CONFER: SFO/U~IT/STATE Octty ........... 6/10/80 ffl?~II'F: '" ~iJ ' REFERENCE: I 3111 ,aC~1 STREj ANCHORAGE, ALJ~SKjAi'~ ~'N~ TELEPHONE (907) 2[6.5-0000G': C)L~ MAIL: POUCH ~12j ANCHORAGE, ALASKA Marathon ...... tv~,bil , , ,, ~ P~ili~ps .... . . ,,, -- E?AE ......... SFO . .......... SOHIO FINA~ DATA D,/~he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/b~IlT/STATE (-Marathon) C-2 C-12 D-6 N-7 Bottom Hole Pressure ])ata Form & Survey (Dresser)5/12/80 " " " " " " (Otis) 5/28/80 " " " " " " (Dresser) 5/6/80 " " " ,~" " " (Otis) 5/29/80 " " " " " " (Dresser) 5/24/80 " " " ~" " " (Otis) 5/17/80 Carol Krzeter Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP'ALASKA PRODUCTION DIVISION TO: i., ,..:-, O! & Gas Co~servation ,, cupine Drive ~ :ch ~ age, Alaska 99501 Attn: Mr. H. Hamilton 3111 "C" STREI .I_,~ " ANCHORAGE, AL/.SK~ 4 c..~--. '- MAIL: POUCH 6-~ 1/24/80[~-~_'~. i.E ~'¢ ~ ~-'-_t -I ........ : ............ .~.?1 [ F: '1 UNIT/SFO/S (Minus Marathon) REFERENCE: SOHIO CASED HOLE FINAL LOGS //~e following~ material is being submitted herewith. Please acknowledge receipt bY signing a copy of'this letter and returning it to this office:- C-1 Spinner 12/28/79 #1 5" C-12 Temp. Survey 1/6/80 #1 5" ~ Spinner 1/6/80 #1 5" F-9 Temp. Survey 12/21/80 #1 5" F-10 Temp. Survey 1/5/80 #1 5" H-7 CNL 1/4/80 #2 5" N-1 EPL 12/27/79 #1 2"/5" N-1 EPA 12/5/79 #2 5" N-5 EPA 12/30/79 #1 5" X-3 Temp. Survey 1/2/80 #1 5" (1 log) Well Records .. · ':h. '~''~ -" "'"' ' '* '. ":'" '~! ' ·" '7 ~ DATE 19 .O SOHIO PETROLEUM COMPANY Division of Sohio Natural Re~urces Company SOHIO-BP-ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA .f'.,!ask80~ & Gas 5001 Porcu[.':.ino Drive Anchorcge,. ,Ala~.ka 99501 Attn: Mr. Ft. !-~amiltor~ 3'111 "c" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 STATE/UNIT/SFO 1/21/80 ATE/UNIT (minus Marathon) : REFERENCE: SOHIO WELL DATA Ilowin~ material is bein~ submitted herewith. ~lease acknowled~ receipt by si§nih§ a coo,/of this letter and returnin§ it to this office:- C-4 G-4 A-7 12 B-13 C-1 C'9 C-10 '. E-2 E-4 F-1 F-7 G-2 N-1 N-2 N-8 EPL 1/1,/80 #2 CNL 12,/20/80 #2 /24/79 Bottom-Hole Pressure Data Form & 1.2/10/79 " " " " " 12/28/79 " " " " " 12/13/79 "' " " " " 12/22/79 " " " " " 12/31/79 " " " " " 12/23/79 " " " " " 1/z/so " ,, ,, ,, ,, 1/7/80 ,, ,, ,, ,, ,, 1/1/80 " ,, ,, ,, ,, 12/21/79 " " " " " 12/23/79 " " " " " 12/29/79 " " " " " 1/2/8o " ,, ,, ,, ,, 1/s/s0 ,, ,, ,, ,, ,, 12/7/80 " " " " " 12/20/79 " " " " " 12/_4/__~9 ............. Bottom-Hole Pressure Data Form ['!, _ _ SI1 Pressure Survey Il II Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il Il II Il Il Il & Pressure Sur\ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: t COMM.~_~ 3111 "C" STREEI ~'~--~5 ' - MAIL: POUCH~61Z J 4ENG _ Unit/P&P/Stat~ 3 ~Offc~OL . STAT TE CONFER; FILF: ~ ........ REFERENCE: Well Data Transmission The following materialis being submitted herewith. P~a~acknowled~ receipt by signing a - copy ofthisle~erand returningitto this office:- ~ copy of the follow±rig, Sohio opera~welZ pressure data=  Government Section-Transient Survey/Packet Il II II II II ~--I " Il Il Il Il q-2 II I1 II Il il J,C-2 Transient Pressure & Spinner/Packet dC-7 " " /Packet Logs of the following 1Sohlio operated wells: Diff.Temp? Run 1 Gamma Ray Run 1 Flowmeter Run 1 Fluid Density Run 1 Hydro Log Run 1 Spinner Log Run 1 Spinner Log Run 1 3/1/79 & 3/8/79 2-9-79 2-7-79 3-4-79 3-2-79 2-3-79 3-19-79 Colette Tracy Well Records SOHIO PETROLEUM COMPANY ;2 'i ........ ': -'" '~ ~'~'!' : :; Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Mr. H. Hamilton REFERENCE: Well Data Transmission 31!1 "C" S'T -'F.T .. TELEPr~C :E (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 November 22, 1978 HKYP i/t .~ ¢./ The following material is being submitted herewith. Please acknowledge receipt by signing a~// copy 'of this letter and returning it to this office:- / I sepia and i print for the following wells: B-2 Spinner Survey Run 1 5" D-5 Spinner-Temp. Run 1 5" Hewlett Packard Pressure Data for the following wells: enclosing pressure gradient survey data sheet, pressure gradient survey graph, pressure build-up survey data sheet, field data, pressure and temp. ~J-3 10-17-78 'v H-6 7-20-78  7-11-78 7-26-78 -:C-7 8-29-78 C-4 9-14-78 Ail of the above pressure reports are Transient Pressures /? ,? //:/. / / c~ff'.//'z":L'." t,z: ,_<'~/[.~ .... Corette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural ReSOurces Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil and Gas, Conservation 3001 Porcupine Dr. Anchorage, Alaska 99504 Attn: Mr. O.K. Gilbreth 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAI L: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 June 16, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Initial Static Pres~p~,,SU,rveys for the following wells: D-3 D-5 D-7 E-4 ~-5 1'-6 1,1-3 N-5 ~-8 June 8, 1977 II I1 I! II 8/l/77 8/1/77 June 8, 1977 Il II !1 II Il I1 !! 1216/77 June 8, 1977 I! 1! RECEIVED DATE 19 BP ALASKA .INC. TO: State of Alaska Department of Natural Resources P. O. BOX 4-1379 3111 "C"STREET ANCHORAGE, ALASKA 99509 TELEPHONE (907) 278-2611 DEV-PB-250/8 February 17, 1978 Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attn: Mr. O. K. Gilbreth REFERENCE: The following material is being submil~ted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- t sepia and 1 print for the following SOHIO operated wells:  TDT-M Run 2 Spinner Run 1 F-$ Spinner " F-8 " " G-4 " " H-2 CCL& Perf. Run 1-5 M-5 " " Run 1-3 High Resolution Thermometer Run 1 Colette Tracy Well Records Divi%cn~ Oil and C~s Conservatic~ O. K. Gilbreth, Jr~ ~v December 6, 1977 Director . ,.1,~ ./ ttoyle H. Hamilton /~ Chief Petroleum Engineez~ ~ Ben LeNonuan ~ Petroleum Inspector Surfa~ Safety Valve (SS~ ahd Subsurface Safety Valve (SSS~ Tests BP's "D", "E", "F", "G" , "J" and "M" Pads ~y, ~. 6, 1977_ - .I.' departed my hcme at 4:00 PM for.a.4:30 PM showup. and 5:30 PM-d~parture via Wien flight #19 for Deadhorse, arriving via F~ at 8:00 PM. I proceeded to Arco's drill site %9 for BOPE tests the follcwlng day. ~y, ~kw~uber 7, 1927- I witnessed success~ BOPE ~_stcn Arco's DS 9-18 auring the aftarnoc~ and was picked up by Nelsc~ Hopper, BP wireltne ccord/nator, at 8:00 PM'.~ arrived at BP.Operations at 8:45 PM. . ....... · _._Tuesday, ~. 8 ~_Friday, ~km~r. 11, 1977 - During this period I ~imes~ SSV and S~ testS-and' mmi~ 9 '"5/8" ~ular pres~s on all Wells c~ pads "D", "E" , "F" and "G" (except w~ll G-3 which was to be pulled) that flc~ into GC-1. All w~lls _b~__d_ shut in autc~a~~y on low pressure pilot when GC-1 was shut down for modification. Low pressure pilots at the ~lls are set at 590 psi. Low pressure flcwline pilot located at the control house is set at 625 psi. High pressure pilots are set at 2600 psi. Since ~ could not bleed into the flowline, a high pressure hose was connected to the top of the tree and pressure bled into a tank in. the back of a pickup. The walls w~re extremely gassy and most of the time expendad in testing was in bleeding the gas caps ~. Testing ~ all wells was initiated by reading the pressure ~above the SSV, bleeding it to zero and moni~ for any buildup for five m/nutes. SSV was ~ ~, a tubing pressure recorded and pressure above the SSSV bled to an easily read differential on the gauge and monitored for five minutes. Annulas pressure be~_n the tubing and 9 5/8" was recorded during this time. Listed below are results of these walls flowing into GC-1, plus recently perforated wells J-9 a~fl M-3 which flow into GC-2: Test 9 5/8" Tubing Test SSV Test SSSV. Time Ann~ PSI @ (PSI) Results .9_ .(PSI) Results (Hr.) PSI Date D-1 800 D-3 : 850 D-4 1400 D-5 1500 D-6 1400 D-7 1500 0 OK. 700 Bad 3/4 0 0 OK ~ .. 340 Bad 1 1/2 0 0 OK 1050 OK 3/4 220. 0 OK 1250 - OK 1 0 0 OK ''900 Bad 1 0 0 OK 1200 OK 3/4 0 11-09-77 '11-09-77 11-08-77 11-08-77 11-11-77 11-09-77 .... F~--1 E-2 E-3 .. . E-4 E-5 ....... -- F-7 F-8 _ G-1 G-2 '-.-. G-"4. J-9 M-3 PS: @ (PS:) 1670 0 OK 1600 0 OK 1600 0 OK 1600 0 OK 1600 0 OK 1600 0 OK 1450 0 OK 1600 0 OK 1600 0 ~ 1600 0 OK 1550 ': 0 OK 1575 0 OK 1300 0 'OK 1550 0 CK Test SSSV @ (PSZ)__ 1200 1200 1050 1250 1050 1300 950 1250 1250 1100 1175 1100 80O 1075 Test 9 5/8" Tim~ Annulas Bad 1/2 0 11-09-77 Bad 2 0 11-09-77 ok I 0 11-09-77 Bad 1 0 11-09-77 OK 1/2 0 11-09-77 OK 1 15~ . 11-09-77 OK 3/4 440 11-10-77 OK 1 0 11-10-77 OK 1 800 11-10-77 Bad 1 570 11-10-77.' OK 1 . ~5 11-11-77 OK 1 0 11-11-77 Bad 3/4 24 11-11-77 OK 1 75 11-11-77 1600 0 OK 1200 OK 1 60 11-10-77 ~550 0 OK 1160 ~, 1 0 11-10-77 (SSSV to be ~- not tested) 1600 0 .OK 1200 OK 1 1/4 0 11-10-77 1500 590 OK 700 OK 1 200 11-08-77 820 140 OK 320 OK 1 1/4' 0 11-11-77 SSV's o~ wells D-3, D-7, F-1 and G-2 initially tested bad, but w~re lubria~ed c~ the night of 11-10 and retested successfully (xl.t~ ~ of 11-12. SSSV failures w~re eight, or 32% of the tm~n~fi~ wells tested. Cc~olusions~. Average res% time per well was 59.4 minutes under less .than ideal cOnclitic~s. The ~ ware extremely gassy, having been shut in for · over 48 hours, cold temperatures (-30° F) froze needle vales and volumes bled th~ the hose were mintaua~. Testing time oould easily be halved while w~lls w~re flow~ fluid into flowltnes, and lc~ pilot shubdown In a meeting Saturday morning, N~ 12, with Ted Staggs, lead petroleu~ engineer, Max Fernandez, field productic~ foreman, and Nelson ~, wirel'in~ ooordinabor, it was decided to u~.ll ~ze tw~ wireline units to re~ove the faulty SSSV's in w~lls D-I, D-3, D-6, E-l, F~2, E-4, F-4, and F-7, replace them and test them-before they w~nt back c~ production. ~cording to Max Fernandez, GC-1 was ~uled' to go on stream c~ Wedne~y, November 16. I advised Max Fe~z these ~lls could go un prod~c~ without agency witnessing, but to advise us of the test results and ~ would re~_,t~ a future witnessed test. ~ .mSm~ y, ~ ~b~.~._ n, ~77'- ~ ~=~d ~m~ via m ~ at 1~00 m, ~iv~ng in Anc~ at 2 :.30. PM and at my hc~e at 3:00 PM. · -3- Deoember 6, 1977 'In ~: I witnessed SSV and SSSV tests cn all wells flowing into GC-1 (e~oept G-3 ~id~ ~as to be worked over), wells J-9 and M-3 flowing into GC-2, and recorded annular pressure be~ the tubing and 9 5/8" All SSV's 'tested suocessfully. ~, SSSV's in wells D-l, D-3, D-6, E-l, E-2, E-4, F-4, and F-7 were faulty and remedial work began Saturday, office before the wells'go cn pzx~%~icn. State witnessing of the SSSV's will be required at a la, er date, Drlg. Permit No. _ Opera tor ~'.,-../;:~ Alaskat,_~,~'l and Gas Conservation Committee ·~Field Inspecti?n Report ~/~ ~,.~ 3 We 11 / P. 3:a~t~m S e c T Represented by ~~.~~ Name & Number ~"'"~. .,~'*-~ z.~.~ Satisfactory Type Inspection Yes No Item ( ) Location,General () () () () ()'() () () ( ) ()? () () () () () Sati. YesSfactorY.INo t'em ~YleBInspectiOnOPE Tests 1. Well Sign ( ) ( ) 15. "Casing set 0 2. General Housekeeping ( ) ( ) 1'6. TesL fluid-( )wtr'.-'~--~ )mud ( ) oil 3. Reserve .Pit-( )open( )filled ( ) ( ) 17. Master Hyd. Control Sys.-' psig 4. Ri.g (m~)~'~Safety Valve Tests 5. Surface'"'No. Wells~~,. 6 Subsurface-No. Wells ( ) Well Test Data 7'. Well Nos. , , , 8. Hrs. obse'l~ , , 9. BS&W , , , ( ) ( ) 18. N2 btls. ,__, ..,_____psig ( ) ( ) 19. Remote Controls ( ) ( ) 20. Drill ine spool- "outlets ( ) ( ) 21. Kill Line-( ) Ch-~'c-k--valve ( ) ( ) 22. Choke Flowline ( )HCR valve' ( ) ( ) 23. Choke Manifold No. valvs fles__ ( ) ( ) 24. Chokes-( )Remote( )Pos.(-~-A-dj] ( ) ( ) 25. Test Plue-( )Wellhd( )csg( )none - ( ) ( ) 10 Gr Bbls , ( ) ( ) 26 Annular Preventer, osiQ ( ) Final ~-,6-a~-~-6nmen{ ( ) ( ) 27. Blind Rams,~ps~e ( ) ( ) 1..1. P&A Marker ( ) .( ) 28. Pipe Rams __psiq ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock __psig ( ) ( ) 13. Clean-up (') ( ) 30. Lower Kelly valve ___psio ( ) ( ) 14. Pad leveled ~ ( ) ( ) 31. Safety Floor ~valves--( )BV '( )Dart Total inspection observation time~hrs/da~.,y~l number leaks and/or ee'bip..~failures ~ Remarks ./,~,~4'~ .~'.: Z ,~v ~ ~'~ ..~.,..,~.~'~ ~ ,~:~ /. [,,~'= :~+~ } ~'~:...~ ~ ,~::~.~ .~ /~'~*~ ~:- ~ ~ ~~. ~.~.~.~ .... ~-.~ ~ ,.. ~6 .~.~ ~ '~'~ ** .~1~ 1' ~Y' ~, ~ ~ ~* .~., ~f~ d- ~.~ ~ ,~ ~ =c'~¢~ ~./¢,~-~,'~,:~,~]Notify in days or when ready Inspected by;~;,.~ ~,, .... Z ~ BP ALASKA INC. P O. BOX 4-1379 3111 "C" STREET ANCHORAGE, ALASKA 99509 TELEPHONE (907) 278-2611 September 21, 1977 GEN-AK-083 TO: State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, AK 99504 attn: Mr. O. K. Gilbreth Director REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: :Form 10-412, Aeservo±r :Pressure Aeport, ±n dupZ±¢ate Bottom-hole Pressure Data Form and Bottom-hole Pressure Raw Data for the following BP wells: (in duplicate) G-1 (01-11-13) G-2 (07-11-14) G-4 (13-11-13) --~~132-12-14) 11-11-13) F-3 (12-11-13) Regin~ McGaffiga~ Geol. Asst. 19/2 STATE of 'ALASKA DEPAR~T CF NA~3RAL RESOUR~ Division of Oil and Gas Cc~serva~ FROM: Chief Petroleun Engineer DATE : June 9, 1977 SUBJECT: Subsurface Safety Valve and Surface CUntrolled Safety Valve. Tests ~s DS 2-8, 3-7, 3-8 -.Th. ursda, y, May._ 19, 19~77 - I departed my hcme at 7:30 AM for a 8:00 ~wup and 9.00 AM d~~ for Deadhorse, arrivin~ at 10:35 AM. to drill site 92 · John Craig, Arco drilling foreran, picked me'up at 3:15 PM and tests began at DS 2-8 at 3:30 ~4. The SSSV w~ closed and shut ,in tub/rig pressure was 1425 psig.' SCSV~ than closed and pressure downstream bled to 200 psig and monitored for five minutes. The SCSV was then o~-and pressure downstream of the SSSV, set at 2197', bled to zero and m0~i~ed for ten minutes. Tests. were concluded at 4:00 PM and a field inspection, repcm~ prepared with the original given to John Craig, Friday, Fay 20, 1977 - Tests c~ DS 3-7 beFan at 10:30 AM with John.Craig. ~ was ~n'~ ~shut in 'tubin~ pressure was 1525 .psig. ~ was then closed and.pressure d~mstrea~ bled to 200 ~sig and m~nitored for five minutes. SSSV, set at 2218', was then closed, SCSV opened and pressure downs~ of the SSSV bled .to 350 psig and m~i~ed for ten minutes. Tests were cc~cl~ at 11:00 AM and a field inspection report prepared with th~ original, given to John Craig, a copy mailed to Bob Hines, and a copy attached to this report. Sa~y, .~y 2~.,. ~.77 - ~Rsts cn DS 3-8 began at 12:05 ~.{ with Lanny Butte_r, Arco drilling foreran. SSSV, set at 2218', was closed with shut in tubing pressure 1425 psig. Pressure downs~ of the SSSV was then bled to 800 psig and monitored for ten minutes. ~ was then closed and pressure downstream bled to zero and monitored for ten minutes. Tests w~re concluded at 12:35 AM and a field inspection report prepared with the'original given to I~nny Burner, a copy ma/led to Bob Hines, and a oopy attad~ to this report.' ~Skm~day, MaY_ 22,. 1977 - Nelson Hopper, BP petrole, un eng--, picked me up at 9:30 AM-an~-~e'.arrived at Well F-2 at 10:10 AM. ~SV, set at 2165', was open and ~xut in tubing pre~sure downstre~n bled to 850 psig' and m~itored for five minutes. '~e master valve was then closed and pres~e DS 2-8, 3-7, 3-8 and F-2 2- June 9, 1977 downstream bled to zero and monit~ f~r five minutes. Tests were concluded at 12:15 PM and a field ~ report prepared with the ~riginal given to Nelson Hopper and a copy attanhed to this report. I departed Deadh~se at 9:20 AM via Wien flight 92020, arriving 'in Anchorage Via Fairbanks at 11:25 PM and at my home at 11:55 PM. At~t Drlg. Permit No. _ Operator ~.,~::~ .. _ AI~" fOil and Gas Conservation Commit; . Field Inspec. tiOn Report . ~,~-~ ~,~/ Wel 1 / P. -~=~f~n Sec T . Represented byd~_ ~~ Name & Numberx~"- Satisfactory Type Inspection Yes No Item ( ) Location,General ( ) ( ) 1. Well Sign ( ) ( ) 2. General Housekeeping ( ) ( ) .~. Reserve Pit-( )open( )filled () () 4. Riq (~l~"~3afety Valve Tests ( ) ( ) 5. Surface-NO. Wells (~)~ ( ) 6. Subsurface-No. Wells t~' ( ) Well Test Data ( ) (.) ,7. Well Nos. , , , ( ) ( ) .8. Hrs. obser , ,_ , ( ) ( ) 9. BS&W , , ,-- ( ) .... ( )' 10~ G-~:'BDls. ( ) Final Abandonment ( ) ( ) l l. P&A Marker Satisfactory Type Inspection Yes No Item ( ) BOPE Tests () () () () () () () () () () () () () () () () () .() () () () () () () () () () () 15. "Casing set @ 16. Test fluid-( )wtr.-7--~ )mud ( ) oil 17. Master Hyd. Control Sys.- psig 18. N2 btls. ,__, ,__psig 19. Remote Controls 20. Drilling spool- "o~-tlets 21. Kill Li.ne-( ) Check valve 22. Choke FloWline ( ) HCR valve 23. Choke Manifold No. valvs flos · 24. Chokes-( )Remote( )Pos.(-~dj. 25. Test Plug-( )Wellhd( )csg( )none 26. Annular Preventer,_ psi9 27. Blind Rams, psio 28. Pipe Rams psiq ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock psig ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psi9 ( ) ( ) 14.. Pad leveled ( ) ( ) 31. Safety Floor valve~--)-BV ( )Dart Total inspection observation time__,<_ hrs/de~j~ Total number leaks and/or equip, failures ~ Remarks cc' Notify in days or when ready Inspected by _ BP ALASKA INC. Mr. L. Smith Chief Petroleum Engineer State of Alaska Dept. of Natural Resources Division of~Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-1379 3111 - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE {907) 279-0644 June 1, 1977 -- 2 ENG '3ENG 4 ,~ ENG 2 GEOL _ , 3GEOL _ __ sec · -CONFER, "-LF ~mEee ' ' I ~I~ Dear Mr. Smith: BP Well,F, 2 (22-11-11-13) Further to our letter of February 17 and in confirmation of recent telephone confirmations, we confirmthat the wireline fish has been removedfrom this well and a subsurface safety valve has been installed. The fishing operations and~installation, of the subsurface safety valve was completed on Mmy 22. The, closure test of the subsurface safety was witnessed by one ofyour inspectors on May 22, 1977. If you have any questions regarding this matter, please do not hesitate to contact me. Very truly yours, BP ALASKA INC. B. E. Davies District Petroleum Engineer BED:blm cc: Manager Operations P. E. Well File F-2 Drilling Well File F-2, #17 GEN-AK083 RECEIVED 7 1977' Division of 0ii & ' ~ Anchorage, BP ALASKA INC. Mr. L. Smith Chief Petroleum Engineer State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Mr. Smith: P.O. BOX 4- ! 379 3 ! 1 ! - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE {907) 279-0644 February 17, 1977 Ic. · 2 G:OL ; ..... DRAFT ......... s~c ....... CO,q, ,.R: BP Well F-2 (22-11-11-13) Very truly yours, BP ALASKA INC. This letter is to confirm our recent telephone conversation in which I informed you that a wireline fish had been left in the upper 2,000 ft. of the above well during wireline operations in late January. The down- hole safety valve had been retrieved prior to losing the fish and cannot be re-installed until the wireline fish is recovered. The nature of the fishing operations is such that it is desirable that a 7" wireline BOP be installed in the lubricator. This is presently not available to us. For this reason, together with the desire to suspend this fishing operation until warmer weather, we are requesting your approval to lea..?~e..,-~i-~--.-.we~...! without a downhole safety valve installed until the end o,E'kpril, 197~7_~) If you have any questions regarding this matter, please do not hesitate to contact me. . ,~, 'iO " blm cc: Manager Production Drilling Superintendent Manager Operations GEN-AK-083 P.E. Well File F-2 Drilling Well File F-2 #17 B. E. Davies District Petroleum Engineer RECEIVED FEB 3 t977 D:visien of Oil and ~'~ Anchor2:.q_9 B P ALAS KA I-N C. P.O. BOX 4-1379 3111 - C - STREET ANCHORAGE, ALASKA 99503 TELEPHONE (907) 279-0644 December 28, 1976 CONFIDENTIAL State.of Alaska Department of Natural Resources Division of Oil and.Gas Conservation 3001 Porcupine Drive Anchorage, Alaska .99504 .Attention: Mr. Hoyle H. Hamilton Director Gentlemen: Well Number BP F-2 (22-11-11-13) Enclosed, in duplicate,.is Form P-7, the Completion Report on the above well, together with the Well History. This wellhas been perforated and is ready for production pending completion of surface facilities. Very truly yours, BP ALASKA INC. P. R~. Judd District Drilling Engineer PRJ:jle Enclosures cc: Well File #17 Ms. Venita Moore '- ....... STATE OF ALASKA st~uctions on _ .p__. C' --DE OI} AND, GAS CONSERVATION COMMITTEE ] 50-029-20084 WELL C~MPLETION OR RECOMPLETION REpoRT AND'--*LOG · ~ O~ CO~O~ WELl. ~¢ ' Put River '2. N&~.IE OF OFI~RATOR BP Alaska: Inc. 3. ADDRESS OF OPERATOR P. O. Box. 4-1379, Anchorage, Alaska ua/ISfON OF OIL A~'.¥> GAS 9 9 509~.~CH O;~,,A G F 9. WI~,L ~0. F-2 (22-11-11-13) I0. FLELAD AaNID POOL, OR %VIIADC&T Prudhoe Ba v Prudhoe Oil'Pool n. SEC., T., R., M., (~OTTOM ~onr OBJECTIVE) Sec. 11, TllN, R13E, UPM. 12. P~TR~VIIT NO. 70-56 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 2888' WEL, 3172' SNL, Sec. 02, TllN, r R13E, UPM. At top prod. interval reported below 3508' WEL, 1573' SNL, Sec. 11, TllN, R13E, UPM. Attotaldep~ 10,940' MD, 9300' TVD. 3883' WEL, 1883' SNL, Sec. 11, TllN, R13E, UPM, OCt. 25, 1970|Dec. 5, lg70 ! June 2, '1976 i KBE 56.74' AMSL / BFE 38 09' AMSL ,,' , f I , , ! . ,, ~ ' 1~. TOTAL DEPTH, ~LO & TVD~19. PLUG,',B3%CK MD & TVD~0. IF 1VEULTI~LE CO1ViPL., ! 21. INTERVALS DRILI, ED BY MD TVD / I ~owy_aawY* t .OrAR~ ~OOLS 'l" c^.,,~ ~oo,..s , ' , ' ~n q/,n. , 93,00 / MD lO.gg0 9260 T~D I Total L , --22] ~C~I~UCING _NTF-ARLAL(S). OF R/lIS ~OMPLETIODT--TOP, BOTTOM, NA~E (~ AND ~)* ~2~. WAS DIRE~IONAL Prudhoe Oil Pool Top - 10,276' ~ 8848' ~D ~ Yes Bottom- 10,470' ~ 8981' ~D 1.~ TYPE ELECTF, IC AND OTHER LOGS:I{UN DIL, FDC, LL3, S.I~, BHCS D r il 1 ing Completion CBL/VDL/GR/CCL in 7" liners. , CASING REC:OHD (Report all strings set in well) 30" Stove PiPe[ ! 92' 36" I 250 sks. Permafrost II 26" 20" 133 ; / K-55~ 2321' 4700 sks. ~rnafros~ II, ~ ' ~"/a~" 64/47 ~5,5/~ 9302 ' 1*~'' J ~..~ ~ 1932 sks, O + 2350 sks. F~ndu 2'083' [ N- o[ 0 4,,X at ea i.t eXi i= ny 26 LINER E~CO~ ' ~ O~ "' ' %.0~ casing, ) -- ~' [ 8802 [ ]0~q98 [50a ~k=_ C]~= ~ ~10~' x 7[' surfama 28. PE~ORATiONS OP~ TO PRODU~ON (interval, size and number) MD. ACID, Si!OT, F;{~CTCRE, C~,IENT SQU__Z~, ETc. ~;~(~0,2~6-~0,306 ft. SK~ (ref. S~CS/S~, 6/~2/~0' ~~~ ~'(~0, 3~5-~0,358 " ( 5(10, 374-10, 414 " ( " E(10,430-10,442 " ( " gz0, 2- 0, 70 ":' ( " i H I I I so. ~oouc~o~"Diary. of Eventf'during perforating & testing operation _~_ .... ~,~,~ ~A::i'~ FIRST '~1%~'~CTIO~ ~ ~ODUCT10~ M~II{O'D (Flov;h~g, gas l~f~, pump~g~size and type of pump) ~V/~LL G'FATUS (Producing or N°v. 12, 1976 ...... -%.~ Flowing l gh,,t-~- [ ~,,~-~, attached. Nov. 1~/76 8 I 42/64 [~"~? ]1687 STS I 1232 I - 173o scf/ST~ '-~X~:, ~BIN~ ~A~hWO PRESSURE [CALC~ OI~BBL. GA~-r~. WA~BBL. ]OIL GRAVITY-~I (CO~.) 1 1650 ¢s~ 5060 I 3694 I - 26.6 31. DISPOSITION OF GAS (~old, used for fuel, vented, etc.) t Both the produced oil and gas were flared. ~2.LIST OB'ATTACHMENTS Well History. ' 'J3. I hereby certify that t regOing and attached information la complete and correct aa determined from all-available ~cor'ds *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete arid correct well completion report end log on all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used ~s reference (where not otherwise shown) for depth measure- ments given in cther spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separatc, production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the p~cducing interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be seperately produced, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). ~'~It¥ OF' ~'OR3VI'ATION TI~-~'I'S INCLUI)IN(; INT£RYAL T~TED. PR~U~ DAT~ ~ '~OV~I~' OF OIL. GAS. 35. G~GIC MARK~ WAT~ AND MUD m~s. v~ ~ v~. BKB SUBS~ Sag River Sandstone 9855 ' 8494' Shub lik 9909 ' 8533 ' Sadlerochit Fora tion 10,026 ' 8616' DATA, AI~ACtl ~I~ ~~~S O:~ LITltOLOGY', POROSITY. FRACAS, APP,~ ~[P~ ~N'D ~4'EC~'Et4 Stt~S OF OIL, -G~ :OH ~VA~. None. ....... WELL HISTORY Well Number F-2 (22-11-11-13) Drilling October, 1970 Skidded rig from F-1 and rigged up. Spudded at 0100 hours, October 25, 1970. Drilled 17½" hole to 2400'. Opened 17½" hole to 26" to 2365'. Ran 60 joints 20" 133 lb/ft K55 Buttress 1!,, API integral joint tubing outside 20" casing to casing to 2321'. Ran 1802'. Cemented 20" with 4700 sacks Permafrost II cement. Cement returns to surface. Nippled up flowline, cleaned out with 17½" bit to 2400'. Installed 13~" BOPs and tested. November, 1970 Drilled 12¼" hole from 2400' to 3466' and drilled directionally to 7343'. Spotted 100 sacks Class "G" + 18% salt cement plug at 2210' and changed blowout preventers to 20" 3000 psi WP rams and 2000 psi WP Hydril. Tested OK. Drilled cement plug and 12¼" deviated hole from 7343' to 9324'. Ran Dual Induction Log. Conditioned hole for casing. Started running ~ 47 lb/ft N80 Seal-Lock casing. Ran 130 joints (5416 ft.) 95,, . ~ casing when weight indicator indicated that string had parted Pulled 73 joints. Ran spear and recovered remaining 57 joints. (Malformed pin pulled out of collar). Conditioned hole. Ran 168 joints of 9§" 47 lb/ft. N80 Seal-Lock casing and 58 joints 132" 68 lb/ft. K-55 Seal-Lock casing, 9§" shoe @ 9302' float collar @ 9262' 9§" stage tool @ 4582' 9§"-132" crossover @ 2250' 132" stage tool @ 2167' , · Cemented ~ ---..,8 casing as follows: First stage - 1310 sacks Class "G" cement with 10% gel and 1¼% D-65. Opened ~ stage tool and circulated cement returns to surface. Second stage - 622 sacks Class "G" with 10% gel and 1¼% D-65. Circulated hole and obtained cement returns. Third stage - 2350 sacks Fondu-Fly Ash. Circulated cement to surface. Nippled up and tested 13~ 5000 psi WP BOP, drilled 13~" and 9~" stage tools ma,, deviated hole to 10,568' and shoe joint. Drilled v2 · Well History F-2 (22-11-11-13) Drilling November, 1970 Stuck string 40 feet off bottom while surveying. Spotted pipe-lax and worked pipe. Unable to free. Lost circulation, unable to reverse circulate. Ran Dialog FPI and attempted to back-off at 9502, 9471 then 9440' (successfully). Recovered drill pipe, 14 joints heavy wall drill pipe and drilling jars. Left fish between 9441' and 10,528' consisting of: 8½" bit, reamer, 26' monel drill collar, stabilizer, 18' monel drill collar, stabilizer, 12 x 30' drill collars, 21 x 30' joints heavy wall drill pipe. Set cement plug from 9438 - 9152' with 130 sacks Class "G" with .1% D-65 and 20 lb. frac sand/sack cement. WOC. Drilled out cement~to 9336'. Ran turbodrill and sidetracked hole to 9371'. Decemb e.r, 1970 Oriented turbodrilland drilled 8½" hole to 9376'. Drilled 8½" hole to 10,940'. Conditioned hole for logs. Ran logs. Conditioned hole once during logging operations. Started running 7" liner. Had 49 joints in hole at 5385' when mud started flowing back. Circulated. Ran 15 more stands of drill pipe. Mud still flowed back. Pulled and laid down casing. (Found fill-up shoe obstructed with rocks.) Reran 49 joints of 7" 29 lb/ft N-80 X-line casing. Shoe at 10,928", landing collar at 10,880', top of marker joint at 9768', top of liner at 8802'. Cemented liner with 500 sacks Class "G" cement with 1% D-65 and 0.4% D-13. Bumped plug, set packer. Reversed out excess cement. Tested packer with 750 psi. OK. Cleaned out to top of liner with stinger 30' into liner. Ran Sperry-Sun gyro survey. Had to remove centralizer springs from survey tool to get below 8859'. Surveyed 7" liner without springs, surveyed 9~" and 13~" casing with centralizer sPrings. Ran drill pipe to 2500' and displaced to diesel. Laid down drill pipe. Installed head. Released rig at 1200 hours, December 12, 1970. DiVI~Obl OF OIL Well History F-2 (22-11-11-13) Workover June.,. 1972 Re-entered well at 2359 hours, June 16, 1972. Tested Hydril to 2000 psi. Ran in with 2-7/8" tubing to 2501'. Displaced diesel from well with CaC12 brine at 10.4 ppg. Spotted cement plug with 100 sacks Permafrost II cement with 15 lb/sack PozZolan. Slurry weight at 14.8 ppg. Damaged crown while pulling out of hole. Made repairs to crown block, water table and mast structure. Ran 8½" and a~,, ~ swages in combination, swaged 13-~" casing f'rom 313' to 1123", ran in hole cleanly to 1249'. RT to change swages. Ran 10½" and 12-1/8" swages in combination, swaged casing from 312' to 1700', ran in cleanly to 2177' and tagged cement plug. Circulated hot brine to thaw annular fluids. Ran 11" bit cleanly to 2177', dressed plug to 2197'. Cut 13-~" casing at 47 ft. and retrieved casing hanger and 29 ft. of casing. Ran Dialog free point indicator which indicated casing relatively free to 500'. Cut casing at 500' and then 157' but could not move casing. Washed over to 240' and cut casing at 238'. Jarred casing loose and recovered. F, 3" Drilled v~ diameter junk sump in cement plug. COntinued washing over and cutting/pulling casing, to 1770'. .Ju~Y, 1972 Continued washing over and recovering casing to 2157' (washover depth) and 2083' (final cut). Ran 11½" junk basket, took core from cement plug and recovered some junk. Ran 18½" bit then 18½" casing scraper to clean 20" casing. Ran 12" bit to 13-~" casing stub at 2083', unable to enter casing so displaced hole to diesel at that depth. Removed BOP, replaced wellhead and tested. Rig released at 1630 hours, Julx 3, 1972. Well History F-2 (22-11-11-13) Completion May, 1976 Accepted rig at 0600 hours, May 20, 1976. Displaced diesel to 10.0 ppg. CaC12 at 2084'. Dressed 13-~" stub 2084' - 2099'. Ran simulated patch and tested. Ran new 13~", 72# controlled yield N-80 Buttress casing tieback string to 2084' with FOC at 2041' and set patch. Ran temperature survey to 2000'. Nippled up and tested tubing head and BOP. Displaced 13~" x 20" annulus to Arctic Pack. Displaced brine to 12.5 ppg mud. Drilled cement plug at 2218', and cleaned out well to top of PBR at 8802'. Dressed PBR and cemented in 40' PBR at 8676' to 3' PBR at 8802'. Cleaned out well to T.D., and ran CBL/VDL/GR/CCL in 7" liner. Tested liner lap both positively and negatively. Changed well over to diesel. June, 1976 Ran 165 jts.'7" 26# Atlas Bradford controlled yield N-80 TC-4S tubing to 8673' with seal mandrel @ 8712' and 59 jts.~ 7" x 10~" Thermocase I from 2131" to surface with ball valve nipple at 2176'. Nippled up and tested wellhead. Tested packoff and control lines to 5000#. Pulled blanking sleeve, ran dummy gun to T.D., re-ran blanking sleeve. Released rig at 1000 hours, June 2, 1976. Perforation November, 1976 See attached "Diary of Events". BP Well F-2 (22-11-11-13) Diary of Events During the Perforating and Testi.n~ Operations (November ,. !976) November 8, 1976 November 9 - 10, 1976 November 11, 1976 November 12, 1976 Novemb er 13, 1976 Ran static pressure/temperature sur~.ey. Perforated the following intervals at 4 s.f.p.:- 10,276 - 10,306 ft. BKB (ref. BHCS/GR. June 12, 1970) 10,315 - 10,358 " ( " ) 10,374 - 10,414 " ( " ) 10,430 - 10,442 " ( " ) 10,452 - 10,470 " ( " ) Ran and set Otis packer/tailpipe assembly at 9740 ft. BKB. Ran tandem RPG-3 pressure gauges. Opened the well to flow to cleanup. Average measured rate 5060 STB/D. CI for PBU after eight hours of total flow. POH with gauges after 12 hours of PBU. Ran and set SSSV in the nipple at.2176 ft. BKB. Closure tested SSSV (witnessed by State representative). End of operations. BP ALASKA INC. CONFIDENTIAL State of Alaska Department of Natural Resources· Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Hoyle Hamilton, Director P.O. BOX 4-1379 31 1 1 - C - 5TREET ANCHORAGE. ALASKA 99503 TELEPHONE [907) 279-0644 December 20, 1976 Gentlemen: Well NumberS~2-11-11-13) ~ (21-12-11-13) BP F-4 (12-01-11-13) Enclosed please find, in duplicate: Form 10-403, Sundry Notices and Reports on Wells; and Form P-4, Monthly Report of Drilling and Workover Operations, for the above named wells. Very truly yours, BP ALASKA INC. vjy Enclosures cc: Drilling Well Files: F-2 #17 F-3 t/17' F-4 7/17 P.E. Well FileS : F-2 F-3 F-4 G. D. Taylor Manager Operations Form 10-403 REV. 1-10-73 Submit "1 ntentions" in Triplicate & "Subsequent Reports,' in Duplicate C* NF ID ENT IAL STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES 'AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 5. APl NUMERICAL CODE 50-029-20084 6. LEASE DESIGNATION AND SERIAL NO. ADL-28280 7. IF INDIAN, ALLOTTEE OR TRIBE NAME WELL 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME BP Alaska Inc. Put River 3. ADDRESS OF OPERATOR 9. WELL NO. p. O; Box 4-1379, Anchorage, Alaska 99509 F-2 (22-11-11-13) 4. LOCATION OF WELL At surface 2888' WEL, 3172' SNL, Sec. 02, TllN, R13E, UPM. 13. ELEVATIONS (Show whether DF, RT, GR, et~) KBE 56.74" AMSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 11, TllN, R13E, UPM 12. PERMIT NO. 70-.56 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF ~] PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS __ (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTER lNG CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals in this well were perforated on November 16, 1976. density used was 4 s.p.f. 10,276 - 10,306 ft. BKB (ref. BHCS/GR, June 12, 1970) 10,315 - 10,358 " ( " ) 10,374 - 10,414 " ( " ) 10,430- 10,442 " ( " ) 10,452- 10,470 " ( " ) The shot OEO3 97G Division o'i C~! an~ Gas Conaemat[ ~n Prior to perforating, a static BHT of 203° F., at 8800 ft. TVD ss, was recorded, Immediately after perforating, a packer/tailpipe assembly was run and set at 9740 ft. BKB. The wei1 was then flowed for a total period of 8 hours at an average rate of 5060 STB/D with a corrected GOR of 730 scf/STB. Bottom, hole pressures were recorded during the drawdown and build-up periods. The well was left with a SSSV in the nipple at 2176 ft. BKB. The closure test of this SSSV was witnessed by the State representative. 16. I hereby certify_that the foregoing is G. D. ?aylor true and correct TITLE ManaRer Operations DATE. (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE CON EN I [ See Instructions On Reverse Side ,, c .OF ALASKA COPY Form No. R~CV. B- I-?O STATE OF ALASKA OIL AND OAS CONSERVATION CONU~ITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WiLL WELL OTHgR 2. N~EOFOP~RATOR BP AlaSka Inc. 3. A~DRESS OF OPE~%ATOR P. 0. Box 4-1379, Anchora§e, Alaska 4. LOCAT/ON OF WELL SUBMIT ]2N DUPLICATE At surface: 2888' WEL, 3172' SNL, Sec. 02, TllN, R13E, UPM. )NF IDENTIAL AP1 NUMERICAL CODE 50-029-20084 6 LEASE DESIGNATION AND S~RIAL NO. ADL-28280 IF INDIA~, ALO7 ik]= OR TRIBE NAME River 8. L~IT FARM OR LEASE NAME Con~.er~t~'~,, (22-11-11-13) 9950 g~'~.~ ~ . I},,r~}~Jun 110 F ~:i~D tNB P~L. OR WILDCAT Prudhoe Bay, Prudhoe 0il Pool Il SEC. T., R., M. (~O~ HO~ o~ See. 11, Tl1~, R13g, U~ 12, PERMIT 70-56 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CI~VlENT!NG JOBS INCLUDING DEPTH SET ~ VOLU1V[]~ USED. PEI~FORATIONS, TESTS A_ND H.ESULTS FISHING JOB~ JY/NK IN HOLE AND SIDE-TlC~ACKED HOLE A2~TD A/qY OTHER SIGNIFICANT CEAN~3~ES IN HOLE CONDITIONS Perforatin.8 and Associated Activities for the Month of November, 1976 Nov, 8 / 76 Zero pressure on annuli. Tested 20" x 13~" pack-off to 2000 psi. Tested tubing pack-off to 4000 psi. Pressure tested control/balance line system. Recovered blanking sleeve from SSSV nipple at 2176 ft. BKB. Ran tandem RPG-3 pressure gauges and an RT-7 temperature gauge to record static survey. Nov. 9-10/76 Perforated the following intervals at 4 s.p.f, using Schlumberger 4" Hyper Jet II carrier guns:- 10,276- 10,306 ft. BKB (ret. BHCS/GR, June 12, 1970) 10,315 - 10,358 " ( " ) 10,374- 10,414 " ( " ) 10,430 - 10,442 " ( " ) 10,452- 10,470 " ( " ) Nov. 11/76 Ran gauge ring and junk basket to 10,000 ft. BKB. Ran and set packer/ tailpipe assembly at 9740 ft. BKB. RIH with Otis tubing end locater to determine Otis/Schlumberger depth discrepancies. Nov. 12/76 Ran tandem RPG-3 pressure gauges and suspended at 10,528 ft. BKB. Opened well to flow to cleanup. After 8 hours of total flowing time, CI for PBU. The well was flowed at an average measured rate of 5060 STB/D with a GOR of 730 scf/STB. Nov. 13/76 After 12 hours of PBU, POH with gauge assembly. Ran and set insert sleeve in SSSV nipple, ran and set SSSV in insert sleeve. Performed closure test of SSSV (witnessed by State representative). Ran in with dump bailer and dumped 5 gallons glycol on top of closed SSSV. End of operation. The well was left.with the SSSV closed and with all of the wellhead valves closed (except the safety valve). SIGNED ~,,,.,v'-'.,~'--, Tn-x~ Mapager Opera tions D~ NOTE--Re~ort on thie form ,e required for .~ colendor ~thT reoordless of the etofus of operofion~, end must ~ filed in duFllcote with the oil and gas consorvotlon commiffee by the 15~ of the suoc~ding mn~,~le~ otherwise directed. CONFIDENTIAL 02~)1B STATE of ALASKA DEPARlt4ENT OF NATURAL RESOURCES Division of Oil and Gas Conservation To. ~-- Hoyle H. Hamilton Director Thru: Lonnie C. Smith Chief Petroleum Engineer Harold R. Hawkins ~~ Petroleum. Inspector VAT': ' November 22, 1976 SUBJECT.' Witness Subsurface Safety Valve on BP Alaska well F-2 Sec. ll, TllN, R13E, UPM Pemi t No. 70-56 Saturday, November 13.,.]976 ,~ I went to Prudhoe Bay by BP Alaska charter a1'rcraft to"'Wi'tness a subsur~face safety valve on the Pad F-2 well. BP's engineer, Gary Pltsga, pi=cked me up at the airport at Prudhoe when I arrived. Allen Leske relieved Gary as operator for BP at 12:00 noon. At 1:00 PM Allen picked me up-, and we went to Pad F-2 for the SSSV test. The operator had previously established flow., flared to the pit and closed the ball valve before I got there. The pressure on the wellhead was zero. The control llne wasppressured to 4500 psi to open the 4 1/2 inch otis SSS valve located at 2,176 feet. The SSS valve took 1 hour and 45 minutes to open and the pressure on the manifold rose to 1400 psi, indicating that the valve had been holding vrith 1400 psi below it. At 3:20 flow was again established by opening the valve on the manifold and flaring to the pit. The pressure on the control line to the SSS valve was relieved and the valve closed. Pressure on the tubing was allowed to bled off to 500 psi and the flow line valve was closed, trapping 500 psi in th~ qubtng a~gom, e the. SSSV. The second closure of the valve was observed 'for 20 minutes with no pressure increase on the tubing, which indicated the valve was not leaking. tn summary: I witnessed subsurface safety valve tests on Well No. F-2 Wi~'h' nofailures. The valve functioned properly with no leakage. Attachment D~I g. Permit No .7/~-~ Operator · sk'a Oil and Gas Conservation Co~ Field Inspection. Report Well/Pla tfm Sec/_/__l/~/lz/R/~.~p~_M Represented by/~/./Z~.~X/.:~-~ Name &' Number Satisfactory Type Inspection Yes No Item ( ) Location,General () () () () () () () () () () () () () () 1. Well Sign 2..~General Housekeeping~ .,~/z-?~.~.? ( ) ( ) 4'. Rig - () () (~/) safets Valve Tests ( ) ( ) ( ) ( ) 5..Surface'-No. Wells ( ) ( ) 0~) '( ) 6~ Subsurface-No. Wells / ( ) ( ) () Well Test Data ( ) ( ) 7. Well Nos. ,~;....~ ~,-~. , ( ) ( ) 8. Hrs. obser.,.~~?''~-, ......... , , ( ) ( ) 9. BS&W ,/! ,. , ( ) ( ) ( ) (')- 10: Gr. Bbls. ,__ ( ) ( ) () Final Ab~ndonr~ent ( ) ( ) ( ) ( ) 11. P&A Marker ( ) ( ) ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) Satis'factory Type Inspection Yes No Item_~. ) BOPE Tests ( ) ( )' 15.~-~ "Casing set @ 16. Test fluid-( )wtr.--~-C )mud ( ) oil 17. Master Hyd. Control Sys.- psig 18. N? btls. ,__, , psig 19 R~mote Controls 20. Drilling spool- "outlets 21. Kill Line-( )Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs fles 24. Chokes-( )Remote(' )Pos.(~Adj. 25. Test Plug-( )Wellhd( )csg( )none 26. Annular Preventer, psie 27. B1 ind Rams,_____psig 28... Pi pe Rams ps i g 29. Kelly & KellY-cock psig . ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psig ( ) .( ) 14. Pad' leveled _/~/~ ( ) ( ) 31. Safety Floor valves-( )BV ( )Dart Total inspection observation time~ hrs/days Total number leaks and/or equip, failures ~/~.~ RemarkS '~'A ~ ~ Y ?$<~.~.-~'m/~-.'V ~_.z~'~' ~. cc' Notify in days .or when ready Inspected by~ ./~'~/~/~.· .... <.. Date///,/.., BP ALASKA INC. P.O. BOX 4-1379 311 I - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 September 20, 1976 CONFIDENTIAL · State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage-, Alaska 99504 Attention: Mr. O. K. Gilbreth, Director Gentlemen: Well Numbers: ~-BP F-20(22-11-11-13) · ]~pT,,F~] (21_.12_ 11_ 1.3 ) BP F-4 (12-01-11-.13) BP F-5 (14-36-12-13) BP F-6 (14-35'12-13) BP F-7 (34-34-12-13) BP F-8 (41-10-11-13) Enclosed please find, in triplicate, Forms 10-403, Sundry Notices and Reports on Wells, for the above named, wells. Very truly yours, \ BP ALASKA INC, C. 'Fay] or Manager Operations Enclosures cc: Drilling Well Files P.E. Well Files Form 10-403 REV. 1-10~73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) ~ JNFZDENTIAL 5. APl NUMERICAL CODE 50-029-20084 6. LEASE DESIGNATION AND SERIAL NO. ADL-28280 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 1. OwLLLLi~'! GAS D OTHERWELL 2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME . BP Alaska Inc. Put River , 3. ADDRESS OF OPERATOR 9. WELL NO. P'. O. ,Box 4-1379, Anchorage' Alaska 99509 F-2 (22-11-11-13) 10. FIELD AND POOL, OR WILDCAT 4. LOCATION OF WELL At surface Z888' W~L, 3172' SNL, Sec. 02, TllN, R13E, OPM. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 56.74' AHSL 14. ~' CheCk Appropriate Box To Indicate Nature of Notice, Re 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) See. 11, TllN, RZJE, UPM 12. PERMIT NO. 70-56 )ort, or Other Data NOTICE OF INTENTION TO: TEst WATER SHUT-OFF ~ PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING . ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion ReDort and Log form.) 15. DESCRIBE~PROPOSED OR COMPLETED .OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals in this well vtll be perforated (at 4 spf) for production:- 10,276 - 10,306 ft. BEB (ref. BHCS/0P., June 12, 1970) 10,315- 10,358 " ( " ) 10,374- 10,414 " ( " ) 10,430- 10,442 " ( " ) 10,452- 10,470 " ( " ) A static bottom-hole ~eaperature survey~r111 be conducted prior to perforating. Immediately following the perforating operation, a static bottom-hole pressure survey will be recorded and the well will be back flowed to cleanup (approximately 2000 bbls). A packer and tatlptpe asaembly~rlll be run and set. at approximately 9755 ft. BKB. The well will be left vtth a SSSV in the nipple at c. 2000 ft. BKS. This work will be performed' during October, 1976. 'CONFIDENTIAL STATE OF ALASKA COPY 16.. , hereby certify that th~e~rrect h /7 SIGNED TITLE ~[anager Operations DATE. o. I //'/' (This space for State office use) c .D,~,O.SO.~..OWk.,~.V. ~'~IvisI~ Of 011 anS~ Is'notlfle~ In or~r to~ltness a test of SSSV when Installed. App~ ~ Instructions On Reveme Side ~d BPAL.ASKA INC. 3111 - C - STREET TELEPHONE {907} 279-0644 CONFIDENTIAL MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 June 10, 1976 J U N i '~ 1976 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director Gentlemen: Well Number F-2 (22-11-11-13) Enclosed, in duplicate, is Form P-7, the Completion Report on the above well, together with Completion History. Very truly yours, BP ALASKA INC. ?. R. Judd District Drilling Engineer PRJ:jle Enclosures cc: Well File #17 Ms. Venita Moore SUBMIT IN r~ ' ,E* ~"STATE OF ALASKA ' ",;.xe~ other In- st ructions on OIL AND GAS CONSERVATION COMMITTEE i i i WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* W ELL W ELL DR Y Other TYPE OF COMPLE~ON: NEW ~ WOnK ~ DEEP- ~ PLUG ~ DIFF. ~ WELI, OVER EN BACK RESVR. Other. ~ __ 2. NAME OF OPERATOR BP AlaSka Inc. 3. ADDRESS OF OPERATOR P. 0. Box 4-1379, Anchorage, Alaska 99509 4. ~,oc^rxox o~- WELL (Report location clearly and in accordance with a~y State requiremetits)* xtsu~ace 2888' WEL, 3172' SNL, Sec. 2, TllN,'R13E, UPM At top trod. mter,a~ reported ~o~ 10,026' MI), 8673' TVD 3367' WEL, 1464' SNL, Sec. 11, TllN, R13E, UPM ~ ~ot~depm 10,940' MD, 9300' TVD 3883' WEL, 1883' SNL, Sec. 11, TllN, R13E, UPM 13.'DzkTESPUDDF2D'[14:'-DATE-Ti~.RF-~CHED~[15;I)AtrEcO,MPsUSP'OI{AB~. ]16. ELEVATIONS (DF, RKB, Oct. 25, 197~ Dec. 5, 1970[ 6-2-76 ~KBE 56.74' AMSL lo 4o' 3oo' 2~. PRODUCING INTERVAL(S), OF THIS C(~MPLETIO.N--TC%P, BOTTOM, NAME (MD AND TV'D)* ..: · 24. Tt~PE ELECTRIC AND OTHt~ LOGS RUN 5. API NUM..CA~CAL CODE 50-029-20084 ~. LEASE DESIGNA/qON A_ND SERLkL NO. ADL- 28280 7. IF INDIA.N, A.LLO'ITEE OR TRIBE NA/VIE 8. UNIT,FA_RNI OR LEASE NAME Put River 9. WELL NO. F-2 (22-11-11-13) 10. FIEL. D ;uND POOL, OR WII~DCtT Prudhoe Bay, Prudhoe Oil 11. SEC., T., R., M., (BOTTOM PIOL~ Pool OBJECTIVE) .Sec. 1!, TllN, R13E, UPM 12. PER1VIIT ~O. 70-56 RT, GR, ETC)'~17. EI..~V. CASINGHEAD ~ BFE 38.09' AMSL 23. WAS DIREC~ONAL SURVEY ~ADE C/~SLNG SIZE 13-3/8" 26. LINEl% RECO~D SIZM 'l' TOP (MD): 28. PERFORATIONS OPFZN TO PRODU¢ CBL/VDL/GR/C. CL in 7" Liner ,, CASING RECORD (Report all strings set in well) 72# ,,,' /N-SO I 208/*' :C~.at~hed intp top of existing 15-3/0" None I]OTTO)/i, (MD) l' SACKS CEME~N'T* ION (interval, size and nurnber) £~P/fOUNT PULLED :aoing) 27. TUBING REC O F~D SC~iEEN(~D) SIZE DEPT~SET(XD ~PACKERSET(MD) Surface-2 il' 7" 2131'- 8712' PRODUCTION DEPT/i INTERVAL (MD) DATE FIRST PI%ODUCTION ! FI%oDucT10.N MEII{OD (Flowii~g, ga5 lif~, pumping--size and type of pump) AMOUN£ A1ND I'2!ND OF M~'I~EP. TAL USED I V/ELI. STATUS (Producing or ~;nuL-in) DATE OF TEST, FLOIV, TUBING I:q~fESS. 31. DISPOSITION OF HOURS TESTED ' [CttOXE SiZE [PF~OD'N FO.l% UA~LNG PRESSURE [CALCULATED OIL--BBL. ,124-HOU1R, RA~E [ GAS (Sold~ used/or ~uei, vented, etc.)' OIL--EEL. GAS--~CF. WATER--BBL. [ GAS-OIL ILYTIO WA_TER~BBL. l OIL GRAVITY-A-PI (COLOR.) tTEST WITNESSED BY GAS--I',iCF. 1 32. LIST O[r ATTACHMENTS Completion History 33. I hereby ee~hed information Is complete.and correct a~ determined frOmSiGNED, ' TITLE District Drilling Engineerall-avallableDATE~~/~/~/~'Tkrec°rds ,, *(See Instructions and Spaces lot Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lands and leases in Alaska. Item: 16: 'Indicate which elevation is used as reference (where not otherwise shown) for depth measure- mentsgiven in cther spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separate production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the prc. Jucing interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be seperately produced, show- ing the additional data pertinent to such interval. It®m26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing anci the location of the cementing tool. Item 28: Submit a separate completion report on this forrn for each interval to be separately produced. (See instruction for items 20 and 22 above). 34.. !~!;: !.;~'J~ItY O!~ FORMATION TESTS INC'LUDIN(;'INTERVAL T~TED, PH.~URE DATA ~ ~OV~l~ OF OIL, GAS,- 35. G~GiC MARK~ WAT~ AND MUD ~ ~C~i) gl~lO~S 'O~OIL. ~; .... ~.- . .... BP WELL F-2 (22-11-11-13) COMPLETION HISTORY MAY 1976 Accepted rig at 0600 hours, May 20, 1976. Displaced diesel to 10.0 ppg. CaC12 at 2084'. Dressed 13-3/8" stub 2084' - 2099'. Ran simulated patch and tested. Ran new 13-3/8", 72# controlled yield N-80 Buttress casing tieback string to 2084' with FOC at 2041' and set patch. Ran temperature survey to 2000'. Nippled up and tested tubing head and BOP. Displaced 13-3/8" x 20" annulus to Arctic Pack. Displaced brine to 12.5 ppg. mud. Drilled cement plug at 2218', and cleaned out well to top of PBR at 8802'. Dressed PBR and cemented in 40'~PBRiat?8676,~ to 3' PBR at 880~'. Cleaned out well to T.D., and ran CBL/VDL/GR/CCL in 7" liner. Tested liner lap both positively and negatively. Changed well over to diesel. *Depth reported in May Form P-4 in error. JUNE 1976 Ran 165 jts. 7" 26# Atlas Bradford 'controlled yield N-80 TC-4S tubing to 8673' with seal mandrel @8712' and 59 jts.'7" x 10-3/4" Thermocase I from 2131' to surface with ball valve nipple at 2176'. Nippled up and tested wellhead. Tested packoff and control lines to 5000#. Pulled blanking sleeve, ran dummy gun to T. D., re-ran blanking sleeve. Released rig at 1000 hours, June 2, 1976. · NC.' STREET · TELEPHONE {907} 279-0644 MAILING ADDRESS: P.O. BOX 4- t 379 ANCHORAGE, ALASKA 99509 June 10, 1976 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director Gentlemen: Well Number F-2 (22-11-11-13) Enclosed, in duplicate, is Form P-4, Monthly Report of Drilling and Workover Operations for the above described well for the month of June 1976. Very truly yours, BP ALASKA INC. District Drilling Engineer PRJ: j le Enclosures cc: Well File Fol'm NO. P-4 SUBMIT IN DUPLICATE REV. 3-1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20084 6. LEASE DESIGNATION AND SERIAL NO. ABE - 28280 WELL WELL OTHER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME BP Alaska Inc. Put R±ver 3. ADDRESS OF OPERATOR 9. WELL NO. P. 0. Box 4-1379, Anchorage, _&l. aska 99509 F-2 (22-11-11-13) 4. LOCATION OF WELL At surface: 2888' WEL, 3172' SNL, Sec. 2, TllN, R13E, UPM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay; Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 11, TllN, R13E, UPM 12. PERMIT NO. 70-56 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. JUNE 1976 Changed well over to diesel. Ran 165 jts. 7" 26# Atlas Bradford controlled yield N-80 TC-4S tubing at 8673' with seal mandrel at 8712', and 59 its. 7" x 10-3/4" Thermocase I fcom 2131' to surface with ball valve nipple at 2176'. Nippled up and tested Xmas tree. Tested packoff and control lines to 5000#. Pulled blanking sleeve, ran dummy gun to T.D.,re-ran blanking sleeve. Released rig at 1000 hours, June 2, 1976. 14. I hereby is true and TITLE District Drilling Engineer DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. ALASKA INC. - - STREET · TELEPHONE {907} 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director Gentlemen: MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 June 4, 1976 ~~x,.;----l--r--I. .... i CONFER: Well Number F-2 (22-11-11-13) Enclosed herewith please find in duplicate Form P-4, Monthly Report of Drilling and Workover Operations for the above described well for the month of May. PRJ:jle Enclosures cc: Well File #17 Very truly yours, BP ALASKA INC. P. R. Judd District Drilling Engineer 1976 I)lV!~iOtfl OIj Ot1,, AND GA :q Form No. P-4 REV. 3-1-70 SUBMIT IN DUPLICATE 'STAT E 0 F A LAS KA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS OIL . ~-~ WELL ... GAS WELL OTHER 2.. NAME OF OPERATOR BP Alaska Inc. 3. ADDRESS OF OPERATOR P. O. Box :41379, Anchorage, AlaSka 99509 4. LOCATION OF WELL At Surface: 2888' WEL, 3172' SNL, Sec. 2, Ti1N, R13E, UPM 5. APl NUMERICAL CODE 50-029-20084 6. LEASE DESIGNATION AND SERIAL NO. ADL - 28280 7. IF INDIAN'ALOTI'EE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Put River 9. WELL NO. F-2 (22-11-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay. Prudhoe Oil Pool 11. SEC. T. R. M. (BdT~OM HOLE OBSECTIVE) Sec. 11~ TllN~ R13E, UPM 12. PERMIT NO. 70-56 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. MAY 1976 Accepted rig at 0600 hours, May 20, 1976. Displaced diesel to 10.0 ppg CaC12 at 2084'. Dressed 13-3/8" stub 2081' - 2099'. Ran simulated patch and tested. Ran 13-3/8" tieback string of 72#.contr.olled yield N-80 Buttress casing and set patch. Ran temperature survey to 2000'. Nippled up casing head and tested, nippled up BOP and tested. Displaced 13-3/8" x 20" annulus to' Arctic Pack. Displaced brine to 12.5 ppg mud..Drilled cement plug at 2218', and cleaned out well to top of PBR at 8802'i. Dressed~PBR and cemented in 40' PBR at 8660' to 3' PBR at 8802'. Cleaned out well to T. D. and ran CBL/VDL/GR/CCL in 7" liner. Tested liner lap both positively and negatively. Dressed 7" PBR and ran 7" tubing and Thermocase I. O/VISION 01~ Oil~ AND 14. I hereby ce~rtect /~'~ SIGNED TITLED is t r ia t NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. NC., 3111 - C - STREET TELEPHONE {907} 279-0644 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 January 28, 1976 FILE: Attention: Mr. O. K. Gilbreth Director .Gentlemen: Pad "F" Well Completions Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for each of the following wells: Z'Well F-2 (22-11-11-13) Well F-3 (21-12-11-13) zWell F-4 (12-01-11-13) Well F-5 (14-36'12-13) ~Well F-6 (14-35-12-13) Well F-7 (34-34-12-13) Well F-8 (41-10-11-13) DIVISION OI~ OIL AND GAS ANC:HO~AG~ The notices contain our proposal to re-enter and complete each of the above wells in preparation for production from the Prudhoe Oil Pool. Our plans call for moving a rig onto Pad F to complete each well in succession beginning approximately May 5, 1976. The only well on Pad F for which our completion proposal is not included herewith is Well F-1 (23-02-11-13). We shall submit a Sundry Notice for Well F-1 at a later date pending delivery of equipment. We have expanded below on several points of interest regarding the Pad F well completions: 1) In Wells F-2, F-4, F-5, and F-6, new strings of 13-3/8" casing will be run and patched into the top of existing casing stubs to replace damaged casing which has been removed during previous workovers. 2) In Wells F-2, F-3, F-4, and F-5, a 40 ft. long polished bore tieback receptacle (PBR) will be cemented into an existing 3 ftAPpr°red ~op¥ · Returned PBR to provide sufficient length for expansion and contraction of the tubing string· _~__ Mr. O. K. Gilbreth -2- January 28, 1976 3) In Wells F-2, F-3, F-4, F-5, F-6, and F-7, the upper 1950~ ft. of the tubing string will consist of 10-3/4" x 7" Thermocase, a dual-walled tubing filled with high grade multi-layer insula- tion in a Freon atmosphere. The outer shell, which is the pressure containing and load carrying member, is 10-3/4" 55.5# Soo-95 pipe. The inner shell is 7" 23# MN-80 pipe. The use of 10-3/4" x 7" Thermocase will reduce the radius of thaw around the wellbore during production so that the resulting worst case thaw-induced strains are predicted to be less than 50% of the strain at the yield strength of casing. (Refer to BP Alaska Inc. report, "Prudhoe Bay Field Proposed Well Completions through the Permafrost Interval" dated October, 1975.) 4) In Well F-8, the surface casing consists of 13-3/8" 72# N-80 Buttress casing which can safely withstand thaw-induced post yield strains as noted in the findings of Conservation Order No. 137. ~ In Well F-8, we also plan to install a tieback string of 10-3/4" 55.5# N-80 casing to the surface stabbed into the 9-5/8" PBR at 2106'. The upper three joints of this tieback string will consist of 9-5/8" x 11-3/4" Thermocase II. The inner shell is the pressure containing and load carrying member and is 9-5/8" 40# N-80 pipe. The outer shell is 11-3/4" 54# K-55 pipe. The use of 9-5/8" x 11-3/4" Thermocase II will reduce thaw around the well at the surface to minimize maintenance for appearance and operational reasons. Very truly yours, ?. R. Judd District Drilling Engineer Attachments cc: Well Files Returned Form 10-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL I=--I OTHER 2. NAME OF OPERATOR BP Alaska, ;[nc. 3. ADDRESS OF OPERATOR P. 0. So~ 4-1379, Anchorage, Alaska 99509 4. LOCATION OF WELL At surfaCe 2888' ~[L, 3172' SNL, SeC. 2, TllN, R/3E, OPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KS][ 5 6~,. 7 4 ' A~SL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20084 6. LEASE DESIGNATION AND SERIAL NO. ADL 28280 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Put River 9. WELL NO. P-2 (22-11-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, t~udhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 11, TllN, 1~13E, ~ 12. PERMIT NO. 70-56 3orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) Complet:e PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF-' WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form,) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. We propose to re-enter the above well approx~telyMay 5, 1976 to co. late the well tn preparatton for production fromthe P~dhoe Otl Pool, as per the follo~ln$ prosraa~ 1) Run 13-3/8" 72~ ~-80 Buttress casing trlCh casing patch from surface to cop of 13-3/8" casing at 2083' 2) Place Arcttc-Pan-k tn 1313/8" x 20" annulus through 13-3/8" F.O. cementer at 2040'+. 3) Dr111 out cement plug from 2197t+ 4) Run 40 ft. 7" PBR and ceaenc int~existtn$ 3 ft. 7" PBR at 8802t. S) Displace well to dlesel froaPB~ to surface. 6) Run 7" 26# N-80 Cubing strtn~wtch 1950'± of 10-3/~" x 7" The~ocase on top, and scab into 7" 1/ncr PBR. A subsurface safety valve, wlth dual control lines, wtll be placed at 2000'~. ; 7) Install and teac xmas tree. [ 8) Suspend ~mll for perforattn$ subsequent to rig release. fora~tons Co be submitted by 8und~y No, ice to follow. CONDITIONS OF APPROVAL, IF AN~.- ~ DIVISION OF OIL AND GAS TITLE .. p'"~''' ~'~'~Jq~l~t, See Instructions On Reverse Side it _ DATE Approved Copy ~etumed ,;,'~~ B P A LAS KAI N C. 8tate of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage. Alaska 99504 Attention: Mr. Homer L. Burrell. Director Gentlemen: P.O. BOX ~t-1379 31 ! ! - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 July 18, 1972 Alterations to BP Well Records In the process of checking and updating our well records, we have found a number of discrepancies between figures .reported to you and figures in our records. Because of this, we are now submitting changes to be made to your records. The following set of figures shows the depth at which conductor pipe was set. Many of the figures were omitted from Form P-7, Completion Report, submitted to you and a few are corrections: Put River #1 (13-27-11-14) J-3 (23-04-11-13) (13-10-14) (14-10-14) (o1-1o-14) (02-10-14) (11-10-14) (19-10-15B) B-2 (23-32-11-14) A-1 (42-35-11-13) A-2 (41-36-11-13) A-3 (44-27-11-13) A-4 (23-25-11-13) A-5 (43-34-11-13) A-6 (32-26-11-13) N-2 (22-17-11-13) N-3 (33-18-11-13) N-4 (23-07-11-13) N-5 (34-06-11-13) N-6 (34-05-11-13) F.-,2 (22-11-11-13),. , F-3 (21-12-11-13) F-4 (12-01-11-13) F-5 (14-36-12-13) F-6 (14-35-12-13) H-1 (41-28-11-13) H-3 (23-22-11-13) H-4 (33-15-11-13) H-5 (12-16-11-13) M-2 (42-12-11-12) M-3 (43-02-11-12.) M-4 (22-31-12-13) 77' 85' 70 ' approximately 68' 70 ' approximately 75 ' approximately 75' 73' 107 ' 89 ' , 99' 99' 99' 99' 89 ' 86' 98' 95' 91' 99' 92' , I 95' 96' 97' 100 ' 103 ' 100 ' 100 ' 99' 99' '97' 97' " JUL g 7 1972 DIVISION OF OIL AND GAS AN ORIGINAL POLAROID~ LAND PHOTOGRAPH OAT ADDRESS ~ALL~T SIZE COPIES For your convenience P558A~ 5i70 Printed AN ORiGiNAL POLAROIDe LAND PHOTOGRAPH SUBJECT D E NAME ~iJ~? ~ ~"I F)d' t~ ~)' ~]WALLET SIZE COPIES~ For your convenience 5 x 7 ENLARGEMENTS when orderln ~,~ d~i~d size(s) you selecL 35mm SLIDES~ P558A-1 5/70 Printed AN ORIGINAL POLAROID® LAND ~HOTOGRAPH SUBJECT,/ ] - ~ ~']~%u'~ ~.: DATE WALLET SIZE COPIES For your convemence 5 x 7 ENLARGEMENTS when ordering copras, red,cate me number o~' 8 X I0 ENLARGEMENTS P55~.] 5170 BP ALASKA INC. P.O. BOX 4-1379 3111 - C - STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 July 13, 1972 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine~Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Well Number F-2 (22-11-11-13) Enclosed in triPlicate are Form P-3, Sundry Notices and Reports on Wells and Diary of Operations for the above named well along with Form P-4, in dUPlicate, Monthly Reports of Drilling and Workover Operations for June and July. Very truly yours, vip Enclosures cc: Operations Coordinator, New York BP ALASKA INC. ward Manager (Operations) Form R_EV. 9-30-69 STATE OF ALASKA S~bmit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate OIL AND GAS CONSERVATIO, N COMMI'I-[EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen use "APPLICATION 'FOR ~'EH~iiT-~' 'for such 'p~o~osalsJ AP1 NUMERICAL CODE 50-029-20084 6. LEASE DESIGNATION A.ND SERIAL NO. ADL 28280 1. 7. IF INDIAN, ALLOTTEE OR TRIBE NA/VLE OIL [] GAS [~ WELL WZLL OTHER 2. NAME OF OPERATOR BP /~l. aska Inc. 3. ADDRESS OF OPERATOR P. O. Box 4-1379, 3m. chorage, Alaska 99509 4. LOCATION OF WELL At surface 2888" WEL, 3172'. SNL, Sec, 2, TllN, R13E, UPM 8. UNIT, FARaWI OR LEASE NAME Put River 9. WELL NO. F-2 (22-11-11-13) 10. FIELD A~q'D POOL, OR WILDCAT Prudhoe Bay~ Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 11, TllN, R13E, UPM 13, ELEVATIONS (Show whether DF, RT, GR, etc. 12, PERMIT KO. 70-56 14. Check Appropria~Box Tol,ndJ~ Nature ~ N~tice, Re ~ff, or OtherData' NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CASINO FRACTURE TREAT j ] MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ABANDON* REPAIR V,'ELL CHANOE PLANS {__} ~ Other) L___J SUBSEQUENT REPORT OF: REPAIRING WELL SHOOTINO OR ACIDIZINO ABANDONMENT* (Other) (NOTE: Report result, of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an)' proposed work. The well was.re-entered'on June 16, 1972. A 100 sack cement plug was set with the top of the cement left at 2197.'. A total of 2083' of casing was recovered. The well was displaced to diesel from 2197' and the rig was released on July 3, 1972. See attached Diary of Operations for details. JUL 1 7 973 DIVISION OF OIL AND GAS 16. I hereby certffy~[.ths fo~ re~o~lnj ~is true and correct SIGNED A. ~. ~oward TITLE Operations Manager (This .pace for State office use) APPROVED BY CONDITIONS OF APPR0¥AL, IF Alii': TITLE DATE See Instructions On Reverse Side l~on~ No~ ~'v. ~-,-i~ STATE OF-ALASKA SUBMIT IN DU?LICATE OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING ANDiWORKOVER OPERATIONS APl NU~IE~ICAL CODE 50-.029-20084 LEASE DESIGNATION AND SERIAL NO. ADL 28280 1. ? IF INDIA~, ALOTTEE O]~ TRIBE NAME OIL ~ GAS [~ OTHER WKLL W~LL ,, 2, N~E OF OP~TOR 8. L~IT F~ OR LEASE N~E BP Alaska Inc. Put ~ver i ADD~ZSS O~ WP~a ..... P. 0. Box 4-1379~ ~chorago~ ,~aska 90509 4. ~CA~ON OF w~ At Surface: 2888' WEL, 3172' sNL, Sec. 2, TllN, R13E, UPM 9 WEll. NO F-2 (22-11-11-13) 10 'i~' A-qb POOL. OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool Sec. 11, TllN, R13E, UPM _ ,2. ~'~,.~I~' ~o 70-56 13. REPORT TOTAL DEi~TI-I AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOL~ USED. PER~O~TIONS. TESTS AND RESULTS FISHING JOB~ JUNK IN HOLE AND S1DE-TP~ACKED HOLE AJ~TD ~Y O~R SIGNIFIC~T ~G~ ~ HO~ ~ITIONS dime, 1.97.2 16 - 20 Re-entered well at 2359 hours, June 16, 1972. Tested Hydril to 2000 psi. Ran in with 2-7/8" tubing to 2501'. Displaced diesel fromwell With CaC12 brine at 10.4 ppg. Spotted cement plug with 100 sacks Permafrost II cement with 15 lb./sack Pozzolan. Slurry weight at 14.8 ppg. Damaged crown while pulling out of hole. Made repairs to crowmblock, water table and mast structure. 21 - 30 Ran 8½" and 9½"swagesin..combination, swaged 13~" casing from 313' to.1123', ran in hole cleanly to 1249'. RT to change swages. 10i'' and 12-1/8" swages in combination, swaged casing from Ran 2 312' to 1700', ran in cleanly to 2177' and tagged cement plug. Circulated hot.brine to thaw annular fluids. Ran 11" bit cleanly to 2177', dressed plug to 2197'. Cut 13~" casing at 47 ft. and retrieved casing hanger and 29 ft. of casing. Ran Dialog free point indicator which indicated casing relatively free to 500'. Cut casing at 500' and then 157' but could not move casing. Washed over to 240' and cut casing 'at 238'. Jarred~ casing loose and recovered. Drilled 6~" diameter junk .sum~in~c~.me~t,p~r~ Continued waShing over and cutting/pulling C~~J[.~79'~2 ~~ JUL 1 ? 197  ,~,, DIVISION OF OIL AND GAt; ~ ' ~., Manager~ (0p~t~pns~ ~A~ ..... ~ SIG~ NOTE ~Ne0orf on fhis fo~ is rebutted for ~oh oolendar ~nth~ te~ordless of t~e stofus of operotiens~ ann must ~ filed ~n du~li~ oil end ~os oonservet~n commiffee h~the 15~ of the suee~ding mon~. ~1~ ofhermtSe l~rm ~o, ~--.4 1lEV. ~~ I-?0 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF ~DRILLING AND WORKOVER OPERATIONS BP Alaska Inc. 3. ADDRZSS Or OTHER SUBMIT IN DI.,~LICA~ APl NU2VIEHICAL ~ODE 50-029-20084 LEASE DESIGNATION AND SE-'IqlAL NO. ADL 28280 IF INDIA]J, ALOTTEE O1~ TRIBE NAME 8. L~.'IT FARM OR LEASE NAME Put River WELL P. O. Box 4-1379, Anchorage, Alaska 99509 4. ~OCATiON OF WFJ.,L At Surface: 2888' WEL, 3172' SNL, Sec. 2, TllN, R13E, UPM F-2 (22-11-11-13) 10 FLFJ~D A_ND POOL. Olt WILDCAT Prudhoe Bay, Prudhoe 0il Pool 11 SEC, T., m., M. {'BO'I~OM HOLE oamcTn~ Sec. 11, TllN, R13E, UPM 12. PEP.MIT NO 70-56 13. REPORT TOTAL DEPTH AT END OF MONTH, CHA~NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOL~ USED. PERFORATIONS. TESTS A/XrD H.ESULTS FISHING JOB~ JI.~"~TK LN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICA/qT CHA. N~ES IN HOLE CONDITIONS July, 1972 Continued washing over and recovering casing to 2157' (washover depth) and 2083' (finalcut). Ran 11½" junk basket, took corefrom cement plug and recovered some junk. Ran 18½" bit then 18½" casing scraper to clean 20" casing. Ran 12" bit to 13~" casing stub at 2083', unable to enter casing so displaced hole to diesel at that depth. RemoVed BOP, replaced BOP, replaced wellhead and tested. Rig released at 1630 :hours, July 3, 1972. JUL 1 7 19'72 DIVISION OF OIL Ab!) GA<3 14. 1 'hereby certif~ ' e foregoing ~ true and correct ~,~ __ " SIGBTED A _ ]<"_ H~r,?.:~-r'fl , ' ' ' NOTE --Rlport on {l~i~ form il rOlluir~d for .e~c~ col{odor montmt} oil end j{s conllrv~lJon commi~{e by lhl IB~ of the luJc~dinl mn~ . Manager (0peratigns) ~ n^~ DIARY OF OPERATIONS WELL NUMBER BP F-2 (22-11-11-13) June, 1972 ... 16 - 20 21 - 30 Re-entered well at 2359 hours, June 16, 1972. Tested Hydril to 2000 psi. Ran in with 2-7/8" tubing to 2501'. Displaced diesel from well With CaC12 brine at 10.4 ppg. Spotted cement plug with 100 sacks Permafrost II cement with 15 lb./sack Pozzolan. Slurry weight at 14.8 ppg. Damaged crown while pulling out of hole. Made repairs to crown block, water table and mast structure. Ran 8½" and 9½" swages in combination, swaged 13-~" casing from 313" to 1123', ran in hole cleanly to 1249'. RT to change swages. Ran 10½" and 12-1/8" swages in combination, swaged casing from 312' to 1700', ran in cleanly to 2177' and tagged cement plug. Circulated hot brine to thaw annular fluids. Ran 11" bit cleanly to 2177', dressed plug to 2197'. Cut 13~" casing at 47 ft. and retrieved casing hanger and 29 ft. of casing. Ran Dialog free point indicator which indicated casing relatively free to 500'. Cut casing at 500' and then 157' but could not move casing. Washed over to 240' and cut casing 'at 238'. Jarred. casing loose and recovered. Drilled 6~" diameter junk.sump, in cement plug. Continued washing over and cutting/pulling casing to 1770'. ~ul¥, ' 19 72 . Continued washing over and recovering casing' to 2157' (washover depth) and 2083' (final cut). Ran 11½" junk basket, took core .from cement plug and recovered some junk. Ran 18½" bit then 18½" casing scraper to clean 20" casing. Ran 12" bit to 13~" casing stub at 2083', unable to enter casing so displaced hole to diesel at that depth. Removed BOP, replaced BOP, replaced wellhead and tested. Rig released at 1630 hour, sT .J~uly 3, 1972. JUL 1 7 197 DIVISION OF OIL AND GAg DIARY OF OPERATIONS WELL NUMBER BP F-2 (22-11-11-13) June, 19 72 ,, .. 16 - 20 21 - 30 Re-entered well at 2359 hours, June 16, 1972. Tested Hydril to 2000 psi. Ran in with 2-7/8" tubing to 2501'. Displaced diesel from well With CaC12 brine at 10.4 ppg. Spotted cement plug with 100 sacks Permafrost II cement with 15 lb./sack Pozzolan. Slurry weight at 14.8 ppg. Damaged crown while pulling out of hole. Made repairs to crown block, water table and mast structure. Ran 8½" and 9½" ~¢ages in combination, swaged 13~" casing from 313" to 1123', ran in hole cleanly to 1249'. RT to change swages. Ran 10½" and 12-1/8" swages in combination, swaged casing from 312' to 1700', ran in cleanly to 2177' and tagged cement plug. Circulated'hot brine to thaw annular fluids. Ran 11" bit cleanly to 2177', dressed plug to 2197'. Cut 13~" casing at 47 ft. and retrieved casing hanger and 29 of casing. Ran Dialog free point indicator which indicated casing relatively free to 500'. Cut casing at 500' and then 1'57' but could not move casing. Washed over to 240' and cut casing'at 238'. Jarred. casing loose and recovered. Drilled 6g diameter junk.sump, in cement plug. Continued washing over and cutting/pulling casing to 1770'. ~ui¥,,, '1972 Continued washing.over and recovering casing'to 2157' (washover depth) and 2083' (final cut). Ran 11½" junk basket, took core.from cement plug and recovered some junk. Ran 18½" bit then 18½" casing scraper to clean 20" casing. Ran 12" bit to 13~" casing stub at 2083', unable to enter casing so displaced hole to diesel at that depth. Removed BOP, replaced BOP, replaced wellhead and tested. Rig .~eleased. at 1630 hours, .July 3, 1972. JUL 1 7 1977 DIVISION OF OIL AND OAS ,/ :, ./ BP ALASKA INC. A-10887 May 26' 1'9721 ~ State of Alaska Department of Natural ResOurces' Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 , P.O. BOX · .31 '11 - C - .,.~TRI=ET ANCHORAGE, ,ALASKA 99,503 TELEPHONE (907) 279-0644 Attention: Mr. Homer'Burrell Gentlemen: 'well :Number"F-'2 '(22~!!~11.13) Enclosed please find,, in triplicate,' Form P-3, Sundry Notices' and RepOrts, for the above named' well, j ch ' Enclosures cc: Operations Coordinator, New' York \~erY truly yours, A. Raye Howard Operations Manager DIVISION OF 01[ Ah~D C'v.',.': Form P--3 REV. 9-30-69 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE O'F ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION 'FOR PEB.~ViiT-~'' '/or such . 1. OIL 0A, [] WELL WELL OTHER 2. NAME OF OPEH~TOR BP .g!~ska: Inc. 3. ADDRESS OF OPERATOR ·. 3111 'C' . Street, 'Ancborage,'.Alaska 99503 4.LOCATION OF WELL A% sur£ace · '2888' 'WEL, 3172" SNL, Section 2,..TllN, R13E' UPM 13. ELEVATIONS (Show whether DF, RT, OR, etc. KB 56.:74-' AMSL _- Check Appropriate Box To I,ndJcate N, ature of NOtice, NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ARANDON$ __ REPAIR WELL CHANGE PLANe j__j, / Other) ! .J 5. AP1 NUMER/CAL CODE 50-029'20086 6. T.I~.~sE DL~S_!GNATION A/WD SERIAL NO. APL 28280 7. IF INDIA.N, ~T.T.O'IM'I~ OR TRIBE NA.M.E 8. UNIT, FARM OR r .I~.&SE NAME Put River' 9. W~LL NO. F-2 (,22.11-11-13) 10. FIF, T.~ ~uND POOL, OR WILDCAT . 'P~',_,dhoe Bay. Prudhoe 0il Pool 11. SEC., T., R., M., (~0TTOM HOLE OBJECTIVE) Section .11, ·TllN, R13E' UPM' 12. PERMIT 1~O. '70-56 m~, or Giber Data EUa,,0~ENT ,:,,'oa, 0,: FRACTURE TREATMENT ALT~RIN0 CASINO 8HOOTING OR ACIDIZING ~ . ABANDONMZNT* (Other) (NOTE: Report results of multiple completion on Well Cornpletton or Reeompletion Report and Log form.) · 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an)' proposed work. We Proposeto re-enter'above Wellin'order.to: .;a) RecOver' collapsed'·13~" casing'previously run. tO '2250 feet. .:b) Run new' 13-~", ·68' lb/ft., .N-80,' Buttress casing'and patch into top of 13~" casing, .lc) Place 40 'feet' of cement l in .13~" x 20!'.iannulus behind casing pat _~_) fill; annulus to surface With residual 'crude Oil. .:d) Test .13~" casing:and displace upper' 2000 feet. to diesel. .:e)' Suspend for later' completion. DIVISION OF OIL AND C. AC, During the above operations the Well'will.be' equipped' with 20". 2000 psi Hydril BOP. Work will begin on'or about June 7, 1972. 1O. I hereby certify t~at, lthe foregoin~ is true and correct SIGNED A- ~r,t~ rd rirr,E Manager' (Operations) (This space for State office use J, , CONDITIONS OF'~ ~'~ ~ ~ AN~ ~' ~~PPRO~AL, IF : ~ See Instructions On Reverse Side May 26, 1972 . Approved Copy Returned BP ALASKA INC. State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907) 277-1422 ~-06602 January 11, 1971 t D~Vi~ON OF O~L AND ANCHORAG~ GAS Attention: Mr. Homer L. Burrell, Director Gentlemen: Monthly Reports Enclosed are monthly reports for the month of December, 1970, for our wells F-2 (22-11-11-13), F-3 (11-12-11-13), N-2 (22-17-11-13) and N-3 (23-18-11-13). Very truly yours, .Clarke Operations Manager gk Enclosures cc: New York For~'~ No. P--4 ~EV. $ - I- 70 ST~TF O[-/'i' ~%b~S~k SUBMIT IN DUPLICATE AND GAS CONSErVATiON CONV~AW{'E[::: MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS WELL WELL BP ALASKA INC. AnDRESS OF OP~Oa P. 0. Box 4-CCC Anchorage, Alaska 99503 4. LOCATION OF ~T.~. 2888' WEL, 3172' SNL, Sec. 2, TllN, R13E, UPM i I lc. ~N~sl ...... ~Am ~mc~u CODS ..... 50-029-20084 _ ~ 3 r:,'.3 'j~ Put ~ver F-2 (22-11-11-13) CON~;~:- I0, FT~L~ Prudhoe Bay Sadlerochit Oil ~oo] n. ssc.. r.. m.; ~¢.. (~OM SO~ o~ Sec. 11, 1~. PEI:U~iIT NO, 70-56 13. REPORT TOTAL DE~TH AT F-,ND OF MONTH. CHA. NGF-,S IN HOLE SIZE. CASING AND CEiM[F2qTING JOBS INCLUDING DE~-'iH SET A_N-D VOLI3'NfES USED, P~O~TIONS. ~TS ~ ~SUL~. FISHING JO~, J~K ~ HO~ ~D SIDE-~CKED HOLE ~D ~Y 0~ SIGNIFIC~T ~G~ ~ HO~ ~DITIONS. CONFIDENTIAL December, 1970 1 1-5 5-8 9 - 11 11- 12 12 Oriented turbodrill and'drilled8½" hole to.9376'. Drilled 8~" hole to 10,940' Conditioned hole for logs. Ran logs. Conditioned hole once during logging operations. Started running 7" liner. Had 49 joints in hole at 5385' when mud started flowing back. Circulated. Ran 15 more stands of drill pipe. Mud still flowed back. Pulled and laid down casing. (Found. fill-up shoe obstructed with rocks.) Reran 4.9 joints of 7" 29 lb/ft N-80 x-line casing. Shoe at 10,928', landing collar at 10,880', top of marker joint at 9768', top of liner.at 8802'. Cemented liner with 500 sacks Class 'G' cement with 1% D-65.and 0.4% D-13. Bumped plug, set packer. Reversed out excess cement. Tested packer with 750 psi. OK. Cleaned out to top of liner with stinger 30' into liner. Ran Sperry-Sungyro survey. Had to remove centralizer springs from survey tool to get below 8859'.' Surveyed 7" liner without springs. Surveyed 9-5/8" and 13-3/8" casing with centralizer springs. Ran drill pipe to 2500' and displaced to diesel. Laid down drill pipe. Installed head. Released rig at 1200 hours December 12, 1970. RF.,. ?V,¢D DIVISION OF OiL AND GAS ANCHO~AG~ ~Tn~ Op~rm~'{ n'ns Mana_~er DA'rs Jan.umry 11 *-'q O 71 ' NOTE--Report on this form is required for each calendar ~nth~ regardless of the status of operations, and must ~ filed ~n duplicate with the oil and gas conservation comml~ee b~ the lSth of the succ~ding month, unle~ otherwise directed. BP ALASKA INC. P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907)277-1422 Jan. 5, '71 TO: Mr. Burrell State of Alaska Division of Oil & Gas 3001 Porcupine Dr. Anchorage, Ak. RE:C'EIVED ANCHORAG! REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- N2 BP 22~17~11--13 DIL Run 1 2" print & sepia F2 BP 22~11-11-13 DIL Run 1 2" print & sepia D. Gudgel Geol.Ass±sta~t DA TE ? ! BP ALASKA INC. P.O. BOX 4-CCC 121 WEST FIREWEED LANE. SUITE 205 ANCHORAGE. ALASKA TELEPHONE (907) 277-1422 A-06574 December 30, 1970 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, DirectOr Gentlemen: Well F-2 (22-11-11-13) Enclosed, in duplicate, is Form P-7, the Completion Report on the above well, together with a Sperry-Sun Directional Survey, Well History and a DIL Log. Very truly yours, BP Operations Manager gk Enclosures cc: New York DIVISION OF OIL AbiD GA5 ANCHORAG~ .~/,. SUBMIT IN DI~ ~C,~:TE* STATE OF ALASKA (Seeothertn- st ruct ions on reverse side? OIL AND GAS CONSERVATION COMMITTEE i WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* WELL WELL DRY Other b. TYPE OF COMPLETION: v~' [: L [, OVER EN BACK P, ESV R. 2. NAME OF OPERATOR BP ALASKA INC. 3. ADDRESS OF OPERATOR Other, Suspension 5. API NU1VIEJ{/CAL CODE 50-029-20084 6. LEASE DESIGNATION AND SERIAL NO. ADL 28280 ?. IF INDIA.N, AJ.~O~E OR TRIBE NA.5~E 8. UNIT,FA, RiVI OR LE, ASE NAME Put River P. 0. Box 4-CCC .Anchorage, Alaska 99503 4. LOC~TION OF WELL (Re~ort location clearly and in accordance with any State requirements)* At surface 2888' WEL, 3172' SNL, See. 2, TllN, R13E, UPM n. sEC.,~.,a.,M,, mOTTO~UO~ OBJECTIVE) At top prod. interval reported below· 10~026' MD, 8673' TVD 3367' WEL, 1464' SNL, Sec. 11, T1LN, R13E, UPM* at total depth 10'9~0' MD, 9300' TVD 3883' l/EL, 1883' SNL, Sec. 11, TllN, R13E, UPM* ,~..r~-~uvaT~o. 70-56 *As measured from $oerrv-Sun Dlrmatlona] Survav Ranort oct. 25, '70[ Dec. 5, 1970 [ Dec. 12, 1970 ~.KBE 56.74. AiMSL ,,~'/!.~ , 38.09 AMSL I-IOW 1VI2%/~Y* ROTARY TOOLS CABI,E TOOLS 9299.6~' ~VD ! 10'880' MD Total 22+ PRODUCING !NT'F.2RVAL(S), OF 'I~IS COMF~TION--TOP, BOTTOM, NAME (i%~D AND 'IW'D)* 23. %VAS D!REC'IqONAL Sadlerochit Sands; 10,026' '(8616' TVD SS) to 10%:858' (9188' TVD SS) . SUR. VEYMADE ~' ! Yes 24'. TYPE ELECTRIC AND OTHER LOGS.RUN [ Prudhoe Bay Sadleroch±t 01Z Pool Sec. 11, TllN, R13E, UPM DIL, FDC, LL, SNP,_SSCS Sez. O:~r~ern ~ iJ~A~ I~ ~' CAS~G RE~ (Report all strings set in well) CAS~4G S1ZE t WEiGhT, LB)FT. ~ 'G~ADE ~ DEP~ET (~)HOLE SiZE! CERiLNTING RECOF~ 26. ~INE~ ~CO~: ] ~7. TUBING RECO[~ 28. PERORATIONS OP~ TO PRODU~O~ (interval size and number) 29. ACID, Si!OT, F/I~CICRE, C~,IENT SQUE2Z~, ~C. D~i IIqT~V.~ (MD) [ AS,iOUNF z'~D K!ND OF 30. P~ODUCTION DATE FIRST PI%ODUC~ON [ ~ODUCT1ON 5~IZ{O'D (FIowiDg, ga3 lif~, palnp~g~size and type of pump) DATE OF T~ST, ~OURS TEST~ '"[CI-tOXE- SIZE=~PF~OD'N FOR OI~BBL. FLOW, ~BING CAS~'G PRESSURB [C~LC~T~ OI~BBL. ~SS. ' ,J24-HOUR._ R~ [ 31. msrosn'~o~ or ~,s (8old, u~e~ l~r I~e[, v,nted, etc.) " GAS--rdfCF. , I A~OUNT PULLED iii I PACKER SET (.,.MD) Sverrv-Sun Directi~n~fl//~dv~e~f, Well History~ DtL Log [ V/ELL STATUS (ProducLug or ~lU ~- ill ) W~BBL. ]OIL GRAVITY-~I (CO~.) ,, ,,, TEST WITNESSED BY A~CBORAG~ *(See Instructions and Spaces for Additional Data on Reverse Side) ·.~. INSTRUCTIONS Generel: This form is designed for submitting a complete and co'rrecl' well completion report end log on ell tYpes of lends end leases in Alaska. Item: 16: Indicate which elevetion is used es reference (where not otherwise shown) for depth measure- merits given in cther spaces on this form and in any attachments. .Items ]0, and ]]:: If this well is completed for separatc, production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the prc. Jucing interval, or intervals, 'top(s), bottom(s) and name (s) (if eny) for only the interval reported in item 30. Submit a separate report (pege) on this form, edequately identified, for eech additional interval to be seperately produce<J, show- ing the ackJitional d~ta pertinent to such intervel. 'Item]6: "$~cks Cement": Atteched supplemental records for this well should show the deteils of ~ny mul- tiple stege cementing ~nd the Iocetion of the Cementing tool. Ite~ ]8: Submit e seperete completion report~on this form for each intervel to be separetely produced. (,See instruction for items 20 end 22 above). , , 'OF FORMATION TESTS INcLu'DxN(~ INTE~VAL T~TED P~URm DATA ~'~'OV~X~ OF OIL, 'GAS, WAT~ AND MUD NA~ MEAS. D~ ~ '"' ' V~T. I I I . . .Lower Cretaceous Unaonfo~ity 8361 7357 Top sag ~ver ~ ands 9 852 8491 Top . Top Sadlero~it ~av.a." ,~acn .,~ ~~~s ~ ~,o~av. :po~:~....~-~.~a~. ,~~ ~ Sands .. 10,026 .. .8616 i i i i ii ~1 ii ~ · Top :Sadlero~it Shales' 10,858 9188 Note: T~ (SS) ,'alues are aalculated f: Spe~y-Su: t Su~ey. from October, 1970 23- 25 25 - 28 29- 31 November, 1970 i - ll 11- 12 12- 16 16 - 19 19 - 21 21- 25 WELL HISTORY, F-2 (22-11-11-13) Skidded rig from F-1 and rigged up. SpUdded at 0100 hours, October 25, 1970· Drilled 17½" hole to 2400'.' Opened 17½" hole to 26" to 2365'. Ran 60 joints 20[' 133 lb/ft K55 Buttress ~asing to 2321'. Ran 1~" API integral joint tubing outside 20" '--"- ' caszng ~o 1802 . Cemented 20" with 4700 sacks Permafrost II cement. Cement returns to surface. Nippled up flowline, cleaned out with 17½" bit to 2400'. Installed 13-5/8" BOPs and tested. Drilled 12¼" hole from 2400' to 3466' and drilled direct- ionally to 7343'. Spotted 100 sacks Class "G" + 18% salt cement plug at 2210' and changed blowout preventers to 20" 3000 psi WP rams and 2000 psi WP Hydril. Tested OK. Drilled cement plug and 12¼" deviated hole from 7343' to 9324'. Ran Dual Induction Log. Conditioned hole for casing. Started running 9-5/8" 47 lb/ft N80 Seal-Lock casing. Ran 130 joints (5416 ft.) 9-5/8" casing when weight indicator indicated that string had parted. Pulled 73 joints. Ran spear and recovered remaining 57 joints. (Malformed pin pulled out of collar). Conditioned hole. Ran 168 joints of 9-5f8" 47 lb/ft. N80 Seal-Lock casing and 58 joints 13,3/8'~ 68 lb/ft. K-55 Seal-Lock_~, 9-5/8" shoe @ 9302', float collar @ 9262' 9-5/8" stage tool @ 4582' 9-5/8"-13-3/8" crossover @ 2250', 13-3/8" stage tool @ 2167'. Cemented 9-5/8"-13~3/8" casing as follows: First stage - 1310 sacks Class "G" cement with 10% gel and 1¼% D-65. Opened 9-5/8" stage tool and circulated cement returns to surface. Second stage - 622 sacks Class "G" with 10% gel and 1¼% D-65. Circulated hole and obtained cement returns. Third stage - 2350 sacks Fondu-Fly Ash. Circulated cement to surface. Nippled up and tested 13-5/8" 5000 ps%W~ ~0~ ~]d~l~. er~)13-3/8" ~ rtl~ed 8~-~'' devzated and 9-5/8" stage tools and shoe joint.~. hole to 10,568' DiViSiON O~ OR AND GAS ANcBORAG~ Well History, F-2 (22-11-11-13) Page Two November, 1970 26 - 30 December, 1970 1-5 5- 8 9 - 11 11 - 12 12 Stuck string 40 feet off bottom while surveying. Spotted pipe-lax and worked pipe. Unable to free. Lost circulation, unable to reverse circulate. Ran Dialog FPI and attempted to back-off at 9502, 9471 then 9440' (successfully). Recov- ered drill pipe, 14 joints heavy wall drill pipe and drilling jars. Left fish between 9441' and 10,528' consisting of: 8½" bit, reamer, 26' monel drill collar, stabilizer, 18' monel drill collar, stabilizer, 12 x 30' drill collars, 21 x 30' ~joints heavy wall drill pipe. Set cement plug from 9438- 9152' With 130 sacks Class "G" with .1% D-65 and 20 lb frac sand/sack .cement. WOC. Drilled out cement to 9336'. Ran turbodrill and sidetracked hole to 9371'. Oriented turbodrill and drilled 8½" hole to 9376'. Drilled 8½" hole to 10,940'. Conditioned hole for logs. Ran logs. Conditioned hole once during logging operations. Started running 7" liner. Had 49 joints in hole at 5385' when mud started flOWing back. Circulated. Ran 15 more stands of drill pipe. Mud still flowed back. Pulled and laid down casing. (Found fill-up shoe obstructed with rocks.) Reran 49 joints of 7" 29 lb/ft N-80 X-line casing. Shoe at 10,928', landing collar at 10,880', top of marker joint at 9768', top of liner at 8802'. Cemented liner with 500 sacks Class 'G' cement with 1% D-65 and 0.4% D-13. Bumped plug, set packer. Reversed out excess cement. Tested packer with 750 psi. OK. Cleaned out to top of liner with stinger 30' into liner. Ran Sperry-Sun gyro survey. Had to remove centralizer springs from survey tool to get below 8859'. Surveyed 7" liner with- out springs, surveyed 9-5/8" and 13-3/8" casing with central- izer springs. Ran drill pipe to 2500' and displaced to diesel. Laid down drill pipe. Installed head. Released rig at 1200 hours December January 13, 1981 Mr. Gary Plisga Sohio Alaska Petroleum Company 3111C. Street Anchorage, Alaska 99503- Re: Our Boss Gyroscopic Survey · Job No. Boss-16727 Well F-~_(SEC2 TllN R13E) ~f~ Prudhoe Bay Field North Slope, Alaska Date of Survey: January 10, 1981 Operator:~.Blaine Baer. tsch.._ Dear Mr. Plisga: Please find enclosed the "Original" and seventeen (17) copies of our Boss Gyroscopic Muitishot Directional Survey on the above well. Thank ~you for. giving us this opportunity_to be of service. KB/kc Enclosures Yours very truly, Oil & Gac Cons. AnchoraG~ ANCHORAGE~ ALASKA -.- DHi. O...ALASKAi!..pETR.OLEUM..::COMPANT_ .............................................................................................. .......... '.:::D.A:~'E.'. OF'SURVEY .d. ANUARY..:.i.0, 1981 '2 SEC2~TllN~R13E COP, PUTAT[ON DATE BOSS 6YROSCOPIC SURVEY ~UDHOE BAY L~---~/-~ dANUARY 12~ .~SKA ~' ,. ' .. 7; .:'~.,.:. :..- :'~::...~',:"/..'::.. '-:~:':'-.<.: :':~' ': ASURED VERTICAL VERTICAL INCLINATION D[RECT[ON [PTH DEPTH DEPTH DEG ~[N DEGREES 1981 JOB NUMBER BOSS-16727 KELLY BUSHING ELEV. = 56.7/+ FT. SEVER I TY DEG/IO0 PERATOR'BLAiNE BARR'TSCH ,... RECTANGULAR CO, ORDINATES NORTH/SOUTH EAST/WEST YERTICAL SECTION 300 299.98 2~3.2Z~ /+00 399.97 3/+3.25 500 /+99.96 q/+$.22 600 ' 700 800 9{30 899.95 8/+3.21 1000 999.95 9/+3.21 1100 1099.94~ 1043,20 0 0 0 42 0 4O 0 48 S 0 /+7 S 0 31 S 2.7 3,3 3O 28 25 37,79 Id 45.39 ~/ 3.19 E S ~1 50 W S 22.29 W S 42.60 E S 39.29 W 1500 1~+00 I 0 1500 1/~99-9/+ 1/+43.20 1600 1599094 1543.20 1700 180'0:: .:L::~/.~: :.1799.'"9::3.::¥':~?:/:~?i7'.~ 3,19 190 O :~::/~:.' '' · :1899' 9 ~"..~. :'.:::?:~:~::i~8.~3 .' 19 2100 2099.93 20~3.19 2200 2199.93 21~3.19 2300 2299.93 22~3.19 O, ," 16"~, S 69.10 0 '.'2! S 58.19 0 : 2/'t S 51.19 0 9 S 23. 0 i,/ 0 18 $ 39. 0 0 18 S 27.10 0 . ..9.:'.'-~. S 61. .0 0:20'_:::..-: S 31.89 0 15 S 53.29 0 18 S 2~.39 W 0 2/+ S 29.39 E 0 28 S ~.29 W 26 O0 ....... : 2S c)9:, 89 ...: '.::..::::. 2$~3.15 2700 2699.86 26/+3.12 2908 2899,83 2843,09 3000: 0 25 ' I 12 I 21 I 5 0 58 S; 30,10 ~ s. ~1,39 w S 10.69 t/ s 0.39 w $ 2,39 td .32 .11 ~59 1,80 S 2.52 2.8/+ S 3.~'~ Id 3~,79' S 3.91 429 ',,06 6.69 S 5.70 7.12 S 5.81 7.46 S 5.99 8.22 8 8,95 S 9.27 S 9.72 S . 10.80'.::S: 415 11.17 S 11.72 S 12.33 S 7.73 Id 7.94 8.23 Id ... 8.68 8.61 8.72 .00 2 3;65 I 0 o 36 S 8.79 Id S 20- I9 Id . : '3~ 18.61 S 10.25 · 13 20.AO S 10.29 7415 7 96 8~7'8 10,~25 10. 7 11455 1149~ 12~6~ 1~ 07 ~;2o t8 56 20 65 , I ~;12. 22.12' S 10,~6 Id 2~,10 ~4 :': 25 !50 ..... IPANY .'SPERRY-SUN W~'[~" SUk OHiO -2 SEC29TllNeR13E ~UDHOE BAY LASKA .... · .,.~,,,.,.:,..,.:..,.:,:,:,...~,~::,,~.?:,:. TR.UE..~:,,.,,,~:,:..:~:::..~?:~::.::?~:.~:?:~:SUB...,SEA . COU S E'A$ UR ~'O .............. ~E'R Ti"C A'E ................. "'~'£'"R'Y: i CA L' i' i~C L~:i:'N'A-T']:' EPTH DEPTH DEPTH DEG MI.N ANCHORAGE,~ ALASKA UANUARY, 1,2, 1981 DEGREES DEG/IO0 dOB NUHBER iBOSS-16727 KELLY BUSHING ELEV. = NORTH/SOUTH EAST/WEST 0 ~ ].981 56.74 FT- SECTION 3500 3~99.67 3~42.93 3 29 3600 3599.36 3542.62 5 38 ~000 3993. 936./+0 1 ~100 ~090.22 4933./+8 1~ 33 4200 ~186.55 4129.81 l& 31 ~600 4556. ~700 ~64~.11 ~800 ~729.12 /+9 ~587.37 4672.38 5250 5105.29 5048.55 5300 51~7.51 5090.77 5550 ':,..'..5189,~3-::{,:':!{Li.i.i:~:!:-~i~i',:i.~.1~2,69 5700 5~.91 5~08.17 5800 5539.87 S 17.50 E S ~3.30 E S 31.. I9 E. S 27.80 E 30 13 S 22.30 E 33 17 S 22.50 E 32 20 32 25 3~ 50 37 39 22 3O 20 S 9.50 E S 5.30 E S 3-30 E S 1.39 E S 1.80 E -,' 27;50 83 2;53 32.52 S 12.15 U 34;57 2; 92 39.00'S 7.86 't/ 39;69 1~64' 1§8.32 S 51.91 E 2~17 131.6~ S 65°05 E 312.12 S lq6.78 E 360.78 S 166.84 E 2;20 3,;07 52'76 27 109,78 :,:'i~!fi:. ":'- 15 8 691 189~23 262,26 303189 :"; 391 · 06 7t61 591.61 S 252.,98 E 503'77 q;50 618.15 S 256o~2 E 528[~5 860.~9 S 267.44 E 926.65 S 269.29 E 1 ;29 58o 73 759L27 822 .so OHIO ALAS_K_A:_~P.ETEOLEUM COMPANY -2 SEC2 eTllN~ R13E PUDHOE BAY ' LASKA WELL ~ ~U'R, >~ ING ,COt4P A~Y SPERRY-SUN ANCHORAGEe ALASKA ........................................................ i ....... DATE'.OF.'SURVEY. ..... ,. ......... ,. ............. JANUARY, lO't 1981 COMPUTATION DATE BOSS GYROSCOPIC SURVEY JANUARY 12. 1981 dOB NUMBER B066-16727 BUSHING ELEV. = 56.7q FT. H EASURED VERTICAL VERTICAL EPTH DEPTH DEPTH COURSE, COURSE INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEG MIN DEGREES DEG/lOO NORTH/SOUTH ~, EAST/WEST SECTION :.6000 2 .6100 6300 5917.26 5860.52 6400 5993.34 5936.60 6500 6069.46 6012.72 6600 ':' I'.84 6900 6374.32 6317.58 7000 6451.43 6394.69 7100 6528.82 6472.08 40 55 S, 0'80' 949s14. 41 2 $':v;O.19.ii.'E'.<. .:':...:'.,,,,.'.' .:1012.23 40 38 qO 30 S 0.50 W ,~4! AO 25 S 1.:39 ~ .59 qO 26 S 1.69 W .20 qO 2 40 4.0 :39 47 39 17 39 17 S 4.50 W S 5.19 W' .67 S 5.89 W .44 7250 6678'19. 6621.45 7400 7500 6817-85 7600 6887.16 7700 6956.53 41 25 44--28 6:691.82 46 6761.11 46 13 6830.42 46 1 6899.79 46 8 S 6.19, W S 7. 259<W S 8.29 S 8.60 W. S 10. OW S 11.19 ki ,,28 1,03 .~87 7800..'::.;:.'. 7'025~;'~:4':q'i.i:;'i;i"~'ii 6968,70 7900 ::<>!:" ,.:~.:~::7094';3~{ <:~ii" 7037.60 8000 ":,.:."j.71:63-,9 q.i.~.i:,:-;!.i?<' 7107.20 8100 72254..32 7177.58 8200 72505.70 7248.96 ~500 7377.99 72521.25 .78 1 06 1,OR 1.96 1.14 84.00 7451'25<'< ......~.:;.72594.51 8500 .: ....'7525.I9 :-." 8600 -. 8700 7675.34 7616.60 8800 7747.55 7690.59 8~00 '7822.0~ 7765.50 gO00 ~' 7898. 08< <.:.>~ 7'8~ 42 23 S 21'5'0 W ~2 15 S 225.79 W 42 4 S-25.50 W 42 25 S 25.$9 W 42 8 S 26. Oki 41 10 S 26.79 W 39 4.9 S 28.79 Y 1.75 1,55 1~ 6 1~11 1~87 1254.59 272.45 E 11258,05 1,319.48 S 271,:38 E 1200,92 1384.31' S 269.62 E 1263,90 16~2.88 S 256-08 E 1516~87 1706.52 S 25~.70 E 1579~8 1769.56 S 244.58 E 1641f89 . 1705,80 1773, 18 20~3.08 S 209.36 E 1915~19 211~.21 S 197.71 E 1966.87 2185.01 S 18~.~6 E 2058.66 225~ 2~30.98 2203.38 2275.~5 2~6~.99 S 118.27 E 23~6p18 2532.0~ S 98.10 E 2416~17 2597.~8 S 75,95 E 2~85 : 2661.24 ~,.19-E" 2552.92 2845.07 S ~0.61 W 2752.09 2905.69 S 59.79 ~ 28~8-26 2965.22' S 89.33 W 2883.~8 2946.88 ANCHORAGE· ALASKA OH I'O '~.A ;OMP AN Y -~' SEC2~T11N·R1~E R UDHOE BAY LASKA E4S'UR E D ........ V'ERT IC ~'E': :'"' .................. V'E'~'i:]"C'A'E: ....... ~ ~'~E'i'~'~'A¥~'*b ~- .... ~'~ ~ ~"C'~ ~ ON EPTH DEPTH DEPTH DEG ~ [N DE~REES [OMPUTATION DATE UANUARY' 12e 1981 930 37 9qO0 8213.5q 6.80 38 9500 8291.09 823~.35 39 9600 8367.8t 8311.09 40 10000 8E, 62.16 8605.q2 10100 8732.60 8675.86 10200 8802.29 8745.55 103 8 1 0400-~:;~'i--:. 89q0.32 '8 1056zt 9052.63 8995.89 10600 9077.06 .9020.$2 10700 91qq.65 9087.91 ~2 5O 5 39.50 W 30 ~5 1 S 55. 0 W q5 24 S 5q.89 ,~6 13 S 5q.50 W ,~6 53'89 q7 5 S 53.19 W ~7 2q S 53.39 W q7 32 S 52.60 W 47 43 S 51,79 W,: DOG DEG~IOO ,! 3,,19 3.80 '".. 6 0 ".39 .86 30 ,,98 '00 .. HORIZONTAL DISPLACEMENT = ~062.36 FEET A BOSS GYROSCOPIC SURVEY dOB NUMBER :,BOSS-16727 KELLY BUSHING ELEV. = 56.7~+ FT. NORTH/SOUTH 1981 EAST/WEST SECTION 3289.06 S 27&.03 W 3340.54 ' S 31q,.21 W 3511.67 S .47 W 3552.q$ S 580.58 W 3593.,87 S 639.10 W $7q8.5 S 8 3764.$6 S 874.52 W 3808.72 S 933.38 W · 15 D · 19 0 3066°47 3125.0~ 3245,14 3304.88 i;:3~17.35 ~3470.90 352~.9q 3579.~1 3~35o03 .10 3861.66 3919.99 3979-08. '4062o$6 THE CALCULATION PROCEDURES ARE BASED , - : .~..: .~.. ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. ' :' ' i:;'' '~ ' !' ??.'~::i;:.:~:?;::!~;i,:.~i!i!!~:'~!!!?;!:!!:::i!??:::?i;: ,": .: SPERRY-SUN ~"~'L-~'"-~'U'-~¥ YING CONPAN' ; -ANCHORAGE,~ ALASKA ALASKA -2 SEC2.~T[1N,RI3E CONFUTATION DATE PUDHOE BAY ,JANUARY 12~ 1981. ,JOB NURBER BOSS-16727 LASKA KELLY BUSHING ELEV. = 56.7~ FT, TRUE SUB-SEA TOTAL '~' EASURED VERTICAL VERTICAL RECTANGULAR COORDINATES RD-'[VD VERTICAL ~'E:PTH,'~:-'~i~.- i:~,:':~'. :' .i' DEP'TH:ii?i?/~iiii!ii!ii:ii!iiiiii~ii!i!ii?i!~P:iTH· i.:i~ ~.'' NORTH,/.~'~i'~ .. EAST/WEST lOOO 999.95 9~3.21 7.12 S 5,81 W .05 .05 2000 1999.93 19~3,19 10.80 S 8.~0 W ,07 ,0I 82 70{2) 0 6~51 8000 7163.9~ 7107.20 9000 7898, 8 78Z+1.'3~ 23.q. 8 S 10,78 W .18 .11 ~706.32 S 250.70 E 5q8,57 2396.36 S 136,59 E 836,06 3022.66 S 119'60 W 1101,92 2~5,8.~ 3511.~7 S 52.2,:q7 3918.05 S 1 073, 1.5./.W THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. .?::,.,,: {',: ANCHORAGE~ ALASKA ;OH! 0 .A LASK A .E U~I:""COM. PANY :-2 SEC2tT11N~R13E ........... ~RUDHOE :BAY' dAN. UARY 12t 1981 tL~SKA ~ ~ .... % SPERRY-SUN WELL SURVEYING COMP ANY ~;.:i~ .UES.:FOR'EVEN ,JOB NUMBER" 80SS-16727 KELLY BUSHING ELEV, = 1 198 56,7A' FT, TRUE SUB-SEA : TOTAL ~£ASURED VERTICAL VERTICAL RECTANGULAR COORDINATES H NORT H' 56 56,74' 0,00 ,05 156 156,74' I00-00 ,69 S 256 256.7~. 200,00 1,33 S 656 656.74' 600.00 4'.94 S 756 ts6. v,+ voo.oo 5.69 s 856 8~6.74 880.{30 6,37 S 1056 7.,22 '-.S 1256 1256.74 1200. O0 1356 1356.74 1300. O O 14'56 1~56.7~+ 1400, O0 1756:...-:. · 0 HD-TVD VERTICAL 8 .ql S 8 .Sq S 9.51 :.S 9.97 S · 0 0 1,12 W ,01 ,01 2.14 W ,02 .01 "g"~"Ke"' .......... ""' ............ ' ............ ~'~'o'~ ................................ ' ................... ' .................... ,~"'O ......................... ' ....................... .................. ............................. 5.'00 W ~05 .00 5,56 W ,05 ,00 5.8 ~ u. ~.~..:,.:~:. :~:~::' :.:~':::::: ?;.. o' s::~:~.~.~?~`.:~:~;.~:~?~:~.~:~?~?:~:~:~~'" ,: :-' .' . '~';' ~"-~' ' ............. ' ............... ";'~'~'" '"" ............................................ ; 0"'~ .......................................................................... 7.16 W ,06 -00 7.67 W .06 ,0 0 8,12 W ::':' - :-2 SEC2~T11N,R13E ~R UDHOE BAY ANCHORAGE9 ALASKA COMPUTATION DATE JANUARY 129 1981 COMP ANY: dOB NUMBER' BOSS-16727 KELLY BUSHING ELEV. = ?AG E 7 1 81 56.74 FT. ,DEPTH"...':' . . TRUE SUB-SEA 1956 1956.74 1900.00 2056 2056.74 2000.00 TOTAL 10-69 S 8.26 W .07 -00 10.97 S 8.59 W .07 .00 8.76 ~ 2556 2656 6 2 2956 2556.74 2500.00 2656.74 2600.00 56 7 3156 3156.74 3100.00 3256 3256.74 3200.00 : : 9o oo 3557: 15.50 S 9.83 W .10 .02 17.78 S 10.-24 W .13 -03 19.67 S 10.26 W .15 2 21.37 2 3.0:5 :. ::,:' S / /'i::".::':'~ .:.:!~..: 10'62 w 24'0:5 s::":..:.' :.'""'": 24.8q S 11.53 W .19 26.00 S 11.77 W o19 .O1 27.49 S 12, 29 W ,21 30,07: $ 3 6:,'0 6' .."S.. ::':.:'..'. 1 0., 2.9..' :W: .: ;i:.':i:!~i::~i!! . · ~ ~3,3{' 73 .95 LASKA 1981 JOB NUMBER BOSS-16727 ~L~SKA ~ KELLY BUSHING ELEV. = 56,74 FT, ".h ....... - . , ........... ~. ...... :~ .,,,,<.._.~ ~:....,............i,.. ~ , .... ....... ..1111 -, . .... ..?.~:'r.,...:??.,~.~.~<:~:<~N,:?ERP:OEA TED VA LUES F OR EVEN .: ~ O0 ~T O F.?SUB..,,SE~<:.~::~.~.~.:..~:~.:~::~:;~?.:~...~:~:~:~..:~:.:~:::.:~:.::.~::`~..;~:~:...~:::~:~::~.:.<.~.>~:::..~:..:::~.:~?:~:~:~:~:~?::~:~..~:~:~:..~:::~.~ :< .. 4EASURED DEPTH: TRUE SUB'SEA TOTAL ?'~ VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL 3758 3860 3856, 0 19- 3962 3956-7q 3900-00 81.24 S 33,96 E- 5,87 2,34 ~065 ~056,7~ 4000,00 100.89 S 47.41 E 8,67 2o. 80 123 W'-8~<<':S- 60, 92 E 183 90.03 E ' 221.85 S --107,81 E 8,~i6 267.17 S 127,99 E 43.21 ll 319,01 S 1~,'61 E 57,93 lq,72 ~4~88 q456.7q 4qO0,O0 ~599 ~556.74 A500.O0 4714 4656.74 4600.00 4953 ?~'8:0.0'.' 00 5073':: 0'0., O0 5192 5056.7q 5000-00 5310 5156,74 5100-00 5q$1 5256,7~ 5200-00 555' 30'0:, O0 ?::...;.....:'5 .56 0.0 o 5 8 2'2::~ ''' 3 O :~ 0 0 4"40'04" S'"" 200.04 E 499.90:':S 225, 93 E 560-90 S 245,71 E 623,99 S 256.96 E 691.79 S 261.26 E 767.92 S-_. 264, 3'~-'~~ 853,30 '.S::-- 2'67,26 E 9~1,58 S:' 269,75 E 18.85 20.92 - / ' ' SPERRY'SU~ WE"L~' 'S~kv'E'¥'[NG COMPANY . :~ ..:::::"ii :' ' ANCHORAGE, ALASKA ', :? 3.0 H I.O A L A $.K A...P E TR OL E'U~.' CO~P A~ :-2 SEC2eTllNeRl~E COMPUTATION DATE ~RUDHOE BAY JANUARY l~ l~B1 JOB NUMBER BOSS-16727 [~ASKA ~ . ~ ~ KELLY BUSHING ELEV- = .~:~::~?:~:~,~?:~?~:~.~.~:~:~:~::~.~:Y~E~D~VA~UES FOR EVEN 100 1981 56o7~ FT. TRUE SUB-SEA TOTAL ~EASURED VERTICAL VERTICAL RECTANGULAR COORDINATES VERTICAL EAS T/W EST oo.oo s v .vo $ DEPTH. MD -TVD 6' 6877 7006 7136 6356,7{+ 6300,00 1628,27 S 257,23 E 520.37 31,01 6~56,7~ 6qO0,O.O 1710,65 S ~50;31 E 550,12 ,29,75 6556,7{+ 6500,00 1792,08 S 2~,2,23 E 579,3{+ 29,21 7A. 11 6756'o:7:4}-::'.::.:.::.':.':67.00'*00 1980,1-5 $:' 218,73 .... :. 7556__.... .......... ~i,~_l, 5 '. ~S.::..:..:' :._ 20 3-15 7700 6956,7{+ 6900,00 2185.22 S 78{+5 7056.74~ 7000.00 2288.38 S 00,00 2389,23 S 138, {+2 8131":"%. ::7256,7.~ 0-..00 2~86.,51 S'. 1']~2,$0 827 0 :::.'" ..0 0 8 2.63 ~0 5 O, 35 7{+3,57 {+~,1 2 788,91 {+5,3{+ 8~2,97 ~+{+ ,06 950,'69 ': TRUE SUB-SEA IEASURED VERTICAL VERTICAL )EPTH SPERRY-SUN ~/.ELL '~-U-~v~YIN$ ANCHORAGE,~ ALASKA : .~ ":i COMPUTATION DATE JANUARY 12~ 1981 OF COMP AN TOTAL RECTANGULAR COORDINATES HD-TVD 8677 7656.7~+ 7600.00 8812 77,56 · 7~+ 7700.00 8946 7855.74 7800.00 0 9455 8256.74 8200.00 9585 8356.74 8300.00 9717 8456.74 8~+00.00 9992 1 0278 8856 · 7~+ 10q25 8956.7q 10570 9056,,74 1071 l 0866..~ 2831o36 S 24.10 W 2913,3a S 63.52 6/ 1055,95 2992.1g S 103, 03 W 1.089.29 ,,-,...., ....... 30~6.q'.i~"..2'3~I S 3265.22 S 2~0,82 U 11~8.76 3333.30 S 308,'36 ~ 1228~78 3395.81 S 366.39 W. 1260.27 8800.00 8900.00 9000.00 565.2,35 S 437,~ 3508'56 S 518,02 :W $ 600.. 61'W 3688.22 S 770.90 W 1467.15 5751.22 S 856.87 W 1515.30 3884.39 S 1050,'58- 3918,05 S 1073'15-W" - ..... 1635 7 THE CALCULATION PROCEDURES USE A LINEAR THE NEAREST 20 FOOT MD (FROM RADIUS · -'~:' ~'- '-' ~"~i ":' - . , { .. · .,:'. :.:::~ ,: . . . .-..:-." ........ . .. . '/-'"'!'~, ",.. ....... . .i ..... :..:.: :'.~:.~:,.!. ................... INTERPOLATION BETWEEN OF CURVATURE) POINTS -- ,-~AGE 10 ANu'~i"Y 10, lgSl ,JOB NUMBER BOSS-16727 KELLY BUSHING ELEV. = 56.74 FT. VERTICAL 35 ol 8 33.34 1 30,02 45.15 46.15 ~Sohi° Alaska Petroleum Company ~ell F-2 (SEC2 TllN R13E) Survoy---.~-te ~-Janu~y--~,--l-981 .... - . - ~ ~n~era~or: Blaine Baertsch Horizontal Projection ' Scale: 1" = 1000' D . ECT ©NAL EP©RT FOR FtE.LD' Prudhoe Bay COUNTY/PA~i$H North Slope ....... STAT[ Aiask~ Dece?~ber ll, 1970 ~-- N $U-3'166[~8 DATE OF SURVZY .... = ......... ~ ................... ~' O~ . ' Anchorage Alaska. OFFICE: , , ~ ~ ...... .,, CHARLES E. HAWK PRESIDENT WELL S[3RVE¥[N G P.Oo Bo~ 6207 Anchorages, ~ask~ 99502 December 16~ 1970 C O MPANY JOS. T. WILSON, JR.. SECRETARY-TREASURER' i~. Paddy A. Barber~ BP AI~ISKA ~,, INC. P.O. Bok~' k-CCC Anchorag~,, Alask~ ~r S~wel Gyroscopic Multishot Directional Survey SU-3-16648 on Put River Well F-2 (22-il-11-13) Prudhoe Bay Field, North Slope, Alaska'. Dear Paddy: W'e are pleased to submit the original and eighteen (18) copies of our 'Gyroscopic Multishot Survey of the above well performed ll December, 1970. The original survey folder contains the tabulation, sheets~ horizontal projection, data sheet, smd film~ The IBM cards used to run this survey are enclosed with the original folder, We appreciate this opportunity to be of service to you and we' hope our service warrants.~ your continued confidence.... Yours.: very ~ruly, SPEP~qY-SUN ~LL Si~VE~iNG COI,EOANY Ted J. ~shby ~' ~ · District 2,~nager Enclosures RAD I US .':OF' DEPTH 100 2O0 3OO 4O0 5O0 600 700 8OO 9O0 i000 I100 1200 !300 1400 1500 1500 1700 !800 1900 2000 2100 2200 2~00 24v~ 2500 2500 2700 280.0 CURVATURE TRUE VERT DEPTH 100.00 200.00 300,00 400, O0 499,99 599,99 699,99 799,99. 899199 999,99 1099.98 1!99,98 1299.98 1399.98 1499,98 1599.98 1699,98 1799.98 1899,98 1999.97 2099,97 2!99,97 2299.9? 2399,97 2L99.96 2599.95 2699.93 2799.90 .. B P ALASKA,' INC. PUT RIVER (22-t!-11-13) .F-2' PRUD?4OE BAY ALASKA SPERRY-SUN WELL SURVEYING COMPANY SUB SEA DRIFT DRIFT DEPTH ANGLE DIREC 43.26 143.26 243.26 343.26 443.25 543.25 643.25 743,25 843,25 9a3e25 I043,24 1143.24 1243.24 13a3.24 1443.24 !543,2~ 1~43,24 1743,24 1843.24 1943,23 2043,23 2143,23 22~,23 2343.23 2443,22 2543.21 2543,19 0 15' 0 15' 0 I0~ 0 20~ 0 25' 0 10' 0 15' 0 20~ 0 30' 0 25~ 0 25' 0 20' 0 5' 0 20' 0 20' O O' 0 20' 0 !5" 0 i0~ 0 10' 0 20~ 0 20m 0 20m 0 20' 0 -45~ 1 I0~ 1 20~ 1 10' S S N S S S S S S S S S N S S S S S S N S S S S S S S 27 14 88 64 -55 57 56 43 56 8 14 73 28 0 ~ 10 89 8O 2 61 48 3O i0 2 10- E E W W W E E ,-. E E E W E E CLOSURE TRUE 11 DECEMBER SU-3-16648 RECTANGULAR' COORDINATES 0.19 S 0,60 S 0,80 S 0.86 S 1.10 S 1,36 S !,56 S 1.84 S 2,31 S 2,83 S 3~46 S 4.11S 4,28 S 4,41 S 4,96 $ 5,23 5 5,50 S 5.97 s '6,18 S "6',16 $ 6.27 S 6,74 S .7,08 S ~7,53 S ~,44 S I0,08 S 12.24 S 14.41 S 0.10 E 0.25 E 0.52 E 0.95 E 1.56 E 2,00 E 2.30 E 2.72 E 3.27 E 3,88 E 4.16 E 4,04 E 4.13 E a.30 E 4,26 E 4.17 E a,26 E 4,46 E 4,71 E 5,00 E 4.92 E 5.21 E 5,68 E 6,05 E 6,2i E 5,87 E 5'66 E 5,89 E 1970 COMPUTED BY DOG LEG SEVERITY 0.25 0.05 0,20 0,22 0.tl 0,25 0.08 0.08 0.21 0.12 0,46 0,08 0,42 0.81 0.37 0.33 0,54 0,13 0.20 0.03 1.97 0,3~ 0.07 0.10 0.83 0,42 0.40 0,22 COMP TEC.H _ SECTION DISTANCE 0,-52 0,65 0,60 0,69 0.83 0,95 !.i2 i,45 1.80 2.35 3.00 3.14 3.24 3.78 4, 4.g ) 4,71 a.86 4.76 ~,88 5,27 5,49 5.84 6,68 8,35 10,50 12.55 .a,D ! US OF ~PTH 2900 3000 3100 ~;200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 z+ 300 ,~-~ 90 aSO0 4600 aTO0 4800 ago0 5000 5100 52.30 5300 5400 fSO0 5600 5700 5800 5900 6000 6100 6200 6300 6400 6500 6600 ) r, 0 R E .dRVAT 1'PUE vERT DEPTH 2899,88 2999.87 3099.86 3199,85 3299,55 3399,83 3499,79 3599,53 3698,90 3797,76 3895.96 3993,98 4090,77 4187.36 a282,78 4376,75 g468,95 4558,72 4646,07 4731,2! am14,24 4896,65 4980,39 5064,25 5147.8~ 5231,14 53!2,0a 5390,16 5465,62 ~540,0~ 5614,69 5689,58 5'764,91 5840,24 5915.57 5991,18 6066,94 6142,69 SUB SEA ,--, p uE TH 2843,ta 294.3.13 3143.11 32~3.11 3~43.09 3~+43.05 3542.79 3642.16 37~1.02 3839,22 3936.84 4034.03 4130.62 4226,04 4320.01 44!2.21 4501.98 4589,33 4674.47 4757,50 4839.91 4923,65 5007.51 5091,14 51 7a, 40 ,~,2~. 30 5333.42 5408,88 548~,34 5557,P5 5632,84 5'708 · 17 5783.50 5858,83 59~4,44 6010.20 6085.95 DRIFT ,'..',.: L E 1 0 0 0 0 0 2 5 7 I0 11. 13 14 16 18 21 24 28 3O 33 34 34 32 ~4 32 34 37 4O 4~ 41 4t 41 al 41 aO 49 5I 35' 55' 55' BO' 35' 15' O' 45' 15' O, O' !~' 15' 0~ 15' O' 45' 15' O' 0~ 30' 15' O' 0~ 45~ 15' 45~ 45' DRIFT DIREC S 16 ~.= S 7 E S 15 W $ 9 W S 21 W S I0 E S 9 E S 45 E $ 45 E S 44. ~.~ S 43 E S 34 E S 28 E $ 27 E s .24 E S 23 ~ S 22 E S 23 E S 21 E S 21 E S 22 E S 23 E S' !7 E 5 5 E S 3 E $ 2 E S 2 E $ 2 E $ 1 E $ 0 E $ I W S 2 W S I W S 3 w S 3 '~' s 3 w COMPUTED .BY COMP TEC'H ~_CT~,,~GULAR DOG LEG SECT ION COORDINATES SEVERITY [)IS'FANC,._E 16,32 S 18,03 S 19,33 S 20.25 S 21,45' S 23.02 S 25,96 S 32,14 S 39.97 50,57 S 64,26 81,18 S 't01,36 124,32 151,26 S 182,63 $ '218,35 $ 259 . 02 S 304.14 S 353 . 09 S 404.95 S 457,28-S 508,60 S 560.95 S 61'4,8'1 S 670 , bO S 728'; 72 S 79t,10 S 855 "66 S 923 · 39 S 989,95 S 1056.; 20 S 112 Z:. 97 S ! 187.71 S 1253.46 S 1318.86 S I~84e04 S 14a9,23 S 6.33 E 0,13 6,68 E 0.21 6,59 E 0.37 6.39 E 0.09 6,07 E 0,48 5.92 E 0.49 6,42 E 1',58 9,56 E 5.73 17,53 E 1.67 28,14 E 2.77 41,12 E 1.76 54,58 E 2.65 66,71 E 1,66 78,66 E 2.02 91,51 E 2.93 105.15 E 2.52 119.95 E 3.03 1'36,79 E 3,78 155.02 E 2.48 173,81 E 2,75 194,24 E 1,84 215,92 E 0.75 · 234,60 E 3.81 249.61 E 2.30 259.59 E 4.97 263,93 E 2.85 266,50 E 2,57 268'67 E 2'75 270,96 E 2,00 272,71E 0,71 274,45 E 0,66 275.61 E 1.4o 275,o4 E 0,70 273,31 E 0,70 271.59 E 0.70 269.31 E 1,32 465,89 ~ = 0,00 262,48 E 0.00 la.,30. 15,87 17.16 18,10 19.33 20.90 23.63 28,86 34,53 42,26-~ 52.39 65,55 82,20 101,58 124,62 151.75 182,83 218,22 257,59 300.54 345.91 391,44 436,72 483,88 533,72 586,22 642,57 702.57 765,63 829,95 89a,12 958,12 1022,07 i086,28 1150.49 i214,50 1275,57 1342,65 ADIUS 0~' CURVAT(j~E =E'AS, TRUE VERT SUB SEA DRIFT 'EPTH DEPTH DEPTH AHGLE 670O 5800 59OO 7000 7100 7200 7300 7400 75OO 7600 7700 '7800 '7900 ?000 r, lO0 ~200 3300 ;4400 :~ 500 9700 8800 ~900 o000 9!00 9200 9300 9400 9500 9600 9700 9800 9848 98'50 9852 9856 9858 62!8,31 6161,57 6293,78 6237,04 6369,53 63!2,79 6445,86 6389,12 6523,02 6466,28 6599.62 6542.88 6673.3& 6616.60 6744,05 6687,31 68!3,04 6756,90 6881,72 6824.98 6950,87 6894,13 7019,70 6962.96 7088,06 7031.32 7!~7.¢5 7100,31 7227,1a 7170,40 7298,32 724!e58 7370,10 7313,36 7442,63 7385,89 7516,07 '7459,33 7589,79 753~.05 7669,67 7606,93 7737,84 7681,10 7812,59 7755,85 7888.48 7831,74 7966.20 ~909.46 ~o~5,26 79~,52.... 812a.60 8067.86 ~209,53 8146,79 8281,38 8224,64 8358,27 8301,53 ~a34,73 8377,99 8509,91 8453.17 8545,23 ~488,49 8546,69 8489,95 ~548.!6 8491.42 8549e62 8492,38 8551,08 ma94.94 c552,54 8495.80 41 41 4O 39 41 44 46 46 a6 46 47 46 46 a5 44 43 42 a2 42 4O 38 37 37 38 39 aO 42 43 a3 43 4~ g3 0! O' 30' O' O' O' O~ O' 45' 30' . 0~ O' 45' O' O' 15' O' O' 30' ~0' 15' 0~ 15' 0~ 0~ 30' ~0' 15' 30' 0~ 15' 15! -~ O' .0~ O' O' O' O' S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S DRIFT DIREC 3 3 5 5 7 6 8 9 12 13 13 1~+ 13 i5 16 18 19 21 22 24 24 24 25 26 27 28 26 28 41 45 47 47 47 47 47 47 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W .w RECTANGULAR COORDINATES 1514.58 S !580,10 S 1645,25 S 1709,66 S 17'73.03-5 t836,95 S 190~.06 S 1974,24 S 2045,83 $ 2117.29 S 2187.82 S 22~8,49 S 2329e46 S 2399,85 S 2469,05 S 2596,7~ S 26O3.32 S 2668.59 S 2732,38 S 2795,23 S 2857,27 S 2918,55-5 2979,23 S 3038,a8 S 3095,27 S 3150,06 S 3204~06 S 3258',76 S 331~,68 S 3369,46 S 3420,56 S 3a68.77 S 3~91135 S 3~92,28 S 3493,21 S 3494,14 S 3495,07 S 3496,00 259,05 E 255.62 E 251,63 E 246,56 E 241,02 E 234,30 E 226.66'E 218.04 E 207.34 E 194,09 E 178,46 E 162.14 E 145,10 E 128.21 E 110,95 E 92.18 E 71.83 E "49.98 E 26,77-E 2,01 E 2~,32 W 51,61 W 7'8.62 W 105,62 W i32,71 W 160,03 W 188,14 W 216,01W 244,50 W 277,42 316.63 W 361,58 W 384,97 W 385,96 W 386,96 W 387.96 W 388,96 W 389.95 W COMPUTED ., BY COMP TECH DOG LEG SEVERITY SECTION DISTANCE 0.25 0,00 0,81 0.81 1.00 2.40 3,08 2,47 1,04 2.18 0.87 I',00 0.76 1.03 1.72 1.02 1.40 1.20 1.43 0,67 1,36 0,25 0.75 !,40 2,08 0,78 0.60 1.45 1,79 3,90 4.54 3,39 3.26 0,00 0,00 0,00 OeO0 OeO0 1406,89 1471,29 i535.a7 1599,19 1662.02 1725.65` 1792,63 1862,81 1934,8 2007,41 2079.62 2152,14 2225.12 2297,5! 2368,83 2439,05 2508,57 2577,19 2644,70 2711.68 2778,24 2844,~0 2909.72 2973.74 3035,4r 3095,1.~ 3!54,37 321a,18 3275.33 3336,a6 3395,52 3453,18 3a80,74 3481,89 3a83,o3 3a8~.17 3485,32 3486.46 !!AS~ TRUE VERT -~PTH DEPTH 9~60 99 O0 ~02 990~ "~06 0908 :29 I0 !7912 '~6 '~O00 322 O28 O30 !00 200 . ~00 "'500 3550 ~555 ]560 2570 O580 25~5 ~590 ~5~5 ]~00 ]625 ^1 ~5~S,0~ 8584,53 8585,97 8557~42 8590,3! 8591.75 8593~19 8594~64 8670~24 8673~06 ~A74~4~ ~6'7~ a9 8677~S~ 8725~39 879m a.;~ 886a~?g 89S3~47 900~67 -. 9035~77 9039,13 9046,00 9049~41 9052~82 9056,23 9059,64 9063~05 9066,&6 9069~87 9073,23 .... 9076~69 SUP. SF.A DEPTH 8497,27. 5526.34 8527~79 8529,23 8530~68 8532,12~' 8533,57 8535,01 8536,45 8537,90 ~597,94 8613,50 °'14~9! 86!6,32 86i9,!5 8620,5.7 8668.65 8738,74 '8875,73 894A,93 8979,03 8982,44 8985,85 ~089,26 8992,67 8998,08 8999.49 9002.90 o~06,31.~ 9009.72 90!3,13 9016,54 9019.95 902~36 9~26,77 9030,18. DRIFT A~, m. t ..--- ~+3 O' a3 4.5~ -- 43- g.~ 43 43 45' 43 45~ 43 45' 43 45~ 43 45~ ~3 45' 45 45 0~ 45 0~ ~5 0~ ~5 0~ g~5 0 ~ 45 0~ 45 0~ 46- 0~ 46 i5~ 47 0 ~ 47 0~ 47 0~ ~7 0~ ~7 0~ ~7 O' ~7 O' ~7 0~ ~7 O' ~7 O' ~7 0~ ~7 O' ~7 O' ~7 0~ ~7 0~ 0~ 0~ DRIFT DIREC S S S .5 S S 5 S S S S S S '$ $ .; S S S S 5' S S S S S S S S S S S S S S S CnnPn I NATE-S . ;- 3496,93 S .=. :3516,22' S- 3517,12 S .. . 3518,03':S 3518.94 S 35!9~84 S 3520~75 S 3521~66 S 3522,57 S 3560'32 5- 3570,11 S 357i~00 S 3'571~89 S '3572~78 S 3573~67 S 3574:~'56 S ~ r~ . ~o~. 17 S 36a7~59 ..S .~.~I,97 S 37~6,72 5 3782,2~ 5 ~805,~0 5 3807,85 S 3810,20 5 ~812o55 S ~8!4,90 5 B817,25 $ ~819,61 5 3821,96 $ ~826,66 5 ~829,0! 5 a8~,71 5 3836,06 S 3340,76 S 390,95 W ali.36 W 4!2~4i W 413,45 W 414,50 W 415,54 W 4!6.58 W a17,63 W 418,6'7 W 4i9~i W 464,7!' W .. 476,80'W 477,90 W 47'9,.00 481.20 W ~82~30 W 520,19-w 576, 7 W 633,57 690,85 W 748~09 W 776~30 W 779~1! W 781,9! W~ 78'4~?I W 787,51 790,31 W 793,11 W 795~91 W 798,71 W 801,5~ W 807,12 W 809,92 W 812,72 w 8!5~52 81© ~2 W COMPUTED BY · . DOG SEVERITY '1 COMP T E C H SE~'T,.. ION DISTANCE 0,00 3,95 0,00 0,00 0.,00 0,00 0~00 0,00 0,00 2,26 0,00 0,00 0,00 0,00 0,00 0,00' 2,08 1,23- 0~25 0,75 0,73 1.46 OoO0 ,~,00 0,00 0,00 0.00 0,00 0,00 0,00- 0,00 0.00 0.00 0.00 0.00 0.00 O.O0 348'7,61 3510,38 35Ii~5t 35~> 3513~78 3514',91 3516.04 3517,i8 35.18.,31 3519,44 ) 3566,9-7 3579.39 358!,65 358'2~78 3583,91 3585*04 3622,93 3678~75 3735,55 3792~8~ 3850,86 3880,25 3883,2! 3886,17 3889'I~ ) 389'8,01 3900.96 3903,92 3906,88 3909,84 3912o80 3915,76 39i~.72 3921.67 3924.63 . ) RAD I US OF MEAS, DEPTH 10630 10700 10800 10852 10854 10856 10858 10860 10862 10864 10866 10876 10900 10940 HORIZONTAL CURVA TURE TRUE VERT DEPTH SUB SEA DEPTH 9090,33 9137,95 9205.51 9240,48 92a!,82 '9243,!6 9244,51 9245,85' 9247.20 92aS.Sa 9249.89 9256.61 9272,75 9299~64 g033,59 9081.2! 9148,77 9183.74 9185.08 9186,42 9187.77 9189,11 9190,46 9191,80 9193,15 9199.87 92!6,01 9242,90 DISPLACEMENT DRIFT ANGLE 47 0t 47 15t 47 45I' 47 45I 47 45t 47 45~ 47 45t 47 45t 47 45~ /+7 45I 47 45 ~ 47 45~ 47 45 I DRIFT DIREC S 50 W S 50 W S 50 W S a9 W S a 9 W S 49 W S 49 W S 49 W S 49 W S 49 W S 49 W S 49 W S 49 W S ~9 W 41!3,45-FEET AT S 14 - RECTANGULAR COORD I NATES 3843,tl S 3876,09 $ 3923,48 S 3948,47 S 3949,45 S 3950e42 S 395!,39 S 3952.36 S 3953.33 S 3954.30 S 3955.27 S 3960.13 S 3971.78 S 3991,21 S 821.12 W 850.42 W 916,90 W 946,17 W 947,29 W 948,40 W 949~52 W 950.64 W 951,76 W 952.87 W 953,99 W 959,58 W 972.98 W 995.33'W 0 10 W COMPUTED BY DOG LEG SEVERITY 0.00 0.35 0,50 1'42 0.00 0.00 0.00 0.00 0,00 0o00 0,00 0,00- 0.00 0,00 COMP TECH SECTION DISTANCE 3927.59- 3969.09 4028,74 4060.08 4061,29 4062,51 4063.72 406&.93 4066- aG67 4068,57 4074,63 a089.19 ~113,44 DATA F:''° EV£N. ~' - ;.,~ FOOT VF'[~ T ~ mai CORiRECT iON I00 2OO ~00 aO0 500 ?00 200 900 i000 Ii00 1300 !400 1500 1600 i700 1800 !900 2000 2!00 2200 2300 ~aO0 2500 2600 2 7 O0 2800 2900 3000 3100 3200 3300 3aO0-- . 35C3 I00. 200, 300, 400 · - ' 500, 700 o 800, 900'. I00~ i!00, 12ne i300~ laO0, !500,' 1600. 1700, · ' !900. 2000, 2~00, 2200, 2300. 25~. 2600, 2700, 2800, 3'~ ~'0, ~200, " 3~00, .. 3500. O, 0,, O. O. O. O. O, O. O. O. O, O, O, Oo O, O, Oo 08 O° O. 0.~ O, O° O. O. Oo O. Oo O. % O, Oo O, O, O. O, O, 08 O. O, O, 08 0- 0.' f O. O, O, Oo '0o 08 - O. O. Oo O. O. Oo O° O° O. O. O, O. OF; TRUE VERTICAL DEPTH · . . . NORTH l NG .... EAST ING ........ 0°19 0,60 0,80 I,i0 i,35 1,56 2,~! 2~83 3.46 4,10 a,27 4~96 5,96 6~18 6~16 6,74 7~07 7,52 8~44 i~,07 12,24 i4,al !6,32 18,OB !9,33 21.44 23,02 25,97 S S 3 S S' S, S S S~ S S S ~ S s ..:- $ . S .' . $ S $ S $ S S S S S S S S S S $ S 0.09 0.52 -0,9.5 1,99 2,29 2,72 ~,27 3,88 4,16 a~03 4,25 4,16 a,25 4~71 ~00 4°91 5,20 6.20 5,87 5,66 5,89 5.33 6,68 6.59 6.39 6.07 5.92 6.42 E E E E' E E E E E E E .) EVEN' I09' FOOT Vt:::',- ~ ~AL, COi~RECT ! ON INT~'r~' ';Ls · ~ 4 V.~ - OF TRUE VERTICAL DEPTH TOTa! CO'"'re A .... .~.~.D I N TES NOR TH i NG EA S T ! NG _.-_ 3600 3701 3802 ',006 4213 a318 4647 ~'763 4882 5004 ~123 J 5242 5362 ~485 m746 5880 6013' 5279 641I 6543 6675 6808 6939 7070 7200 7~7 748I 7626 7771 ~60~ 3800, 3900, a20O, 4300. 4400, 4600, 4800, 4900~' 5000~ 5i00~ 5200~ 400, 5500~ ~600, 5900, oOuu, 6200~ 63^n 6600, 6700, 6800, 7, I0. 18, 47, 1.43 · 16.3, 213, 246, 31a, 379. g12., 444 ~ 476. 5aO. 570, 50.I. 638, 68~ ~. · 726. 77!. O~ 5, 7, 13, .. 21~ 28,, - 32. ~2. =0 45, 32,i7 z~O~08 64,95 82,50 127 23.2~aI 280 .,.. 335,14 3~6~05 459,33 5°0~R4 583,97 649.35 )19.97 vq9~64 887,46 976,E4 ~ ~ 29 !152~59 1239.87 1326,44 1412,49 ~498. ~ 5 !585.44 1670.96_ 1754.12 ~ ~37 !930,52 2032,30 2i~5,93 223~,26 S S .$ S. S S S . S $ $ $ . . $ $ $ $ S $ 5 S $ 'S S $ -$ $ $ $ $ 9,60 1'7,65 &I~67 67,85 80,36 94,0! !08,88 !25.77 145,40 !66~92 190,.73 2i6~'66 238.10 253,87 262,30 266~iI 26~97 271~77 2'74,11 27~~, 53 274,23 271,94 268~91 264,a0 259.8S 255,29 249.60 242,67 23~,26 223,40 209,~6 i89,96 165,8! E E E E E E E £ _) .) ...... r w ..: W COP~.~EC T ! ON iNTCRVALS. (IF,. TRUr'., ,.. ~;ER!'I~'^~~ ,~,-,~ DEPT~'~,, . . . 'TOTAL. C''c' . w~R9' T ~A T E S "'~RT~-'~ ~ ~G 'EAST ~ 7917 805! 8202 8.$6! 8478 86!3 8883 9395 952z~ 9654 g7~6 992~ 0064 0206 064~+ 079i riO0 ,, 7200, '7 j ~j ® 7500, 7600 ~, 7700. 78©0. 7gn~, 8000, 2!00. 8200 ,, 850n 8700, rig0n gO00* 9 ! O0. 9200. 817, 86!, 9ai~ 978, lOago I083, I16a !196~ .~.~ .... 125.5, 1287. ~354 !407~ 1451 · 1592, 44~ 26~ 27~ ~29~ 47. z~.8~ .2341~54 S 24z~2~24 S 253~30 S 2'630~22 S 2718.42 S 2803. BO S: 28~.-', 28... ~S 2969~01 S 3118~69 S '3187~31 S 32~6~30 332'7~94 3397,3~ 3462,4 ! 3525~93 S - - .,-. 37 i,., ~, 90 S 3781,13 S 39ig,60 S 142,18 E 117,63 E 91~70 E 62,82 E !~62 W 37~68 W 7a.o7' w I09~63 179,/-2 W 2i4,7~ W 252,47 298~81 W 3~5,65., W 4 23 · 73 W '. 500.17 W 58'~u ~47 W' 7a6.69 W 829,10 W 9!2~29 W ~ 56 556 656 1056 115~ !256 1356 1456 1556 1656 ! 756 la~6 1956 2056 2!56 2256 2~56 2556 2656 27~6 2856 2956 3056 3156 ~256 ~356 ~456 157. 257~ 357, 95'7. 1057. 1157. !357~ 1~57~ 1757~ ! 857 · !°57'~ 2057. 2157.: 2257. 2357, 245?, 2657. 2757. 2857~ 2957, 3!57, 257.' · 3=57, 3457, 3557, ) EVEN I00 FOOT VEqT I CAL CORRECT ION 1592, O. O. O, O, O, O. O~ O* O* O, Oo O. O, Oo O* Oo O* O, O* O* Oo I~'~TERVAi 5 ',.,,. . TOT,~' NORTH I NG COORD ! NATi!S FAST u~'42 0~99 1~24 1.72 ~!9 3,82 4,20 a,72 5~!! 5,'3~ _ 5.76 ~ 09 0~22 7,33 9,37 t~,47 i5,a9 !7,29 18,77 i9,85 24,69 29,48 S 5 S S S :$ S S S~ S 5~, S S- 'S S S S S S S S S S S S 5 S $ S $ S 0,76 1,80 2.16 2~53 . 3,6i 4~04 ~+~09 4.09 4..22 4~27 4.21 4,36 a, 6 0 '~+ ~8'7 4~95 5,08 5,~7 6~01 5.75 5,79 5,!4 6.53 6,52 6,47 6,21 6.20 8.21 ,) SUa 5 "" O El P T -N wO~ 4.00. -500. 600, 700, · l 00 O · II00, ~2on I~00~ i500~ 1600~ 1700~ 20n~ 2100. 2700, 2aO0, 2900, 3000, 3100 3200 3'300 3400 ~0 ~'.'~ E A .S U iR E D DEPTH 'tN T FR POLA'r ED DATA FOR TRUE VERT, D E P TH VE'~'r t,~AL CnPR~: ,, ..... C ri nN I'NT-ERVALS OF. SUB SEA DEPTH T 0 ? ;' L N 0 R T ~"~: ! N G ,.,ur D!NATES S t...~ i.5 SFA D E P T H 3657 ~.75~ 380..0 3962 ~!68 a 272 4378 4486 4597 ~8~ 49~ ~ 507L 53!0 ~431 5557 56~~ 5822 5956 6089 622~ ~35~ 6~86 661 'B 6750 7~ 71&~ 7277 7~18 3757, 395?* a157,. 4257, ~357, 4a5'7, 4557, 4657: 4757: 4~57, 4957~ 5057: 5~57~ 5357~ 5a57~ 5557, 5657, 5757, 5857, 09~7, 6057, 6157, 6257~ 6357~ 6~57, 665~. 6757.' &857. 7O57, 12~ 22, 74~ 115, 13a, !5~. 200~ 266, 299. 332, 365, 398, 462, ~26. 587, 662, 707, '752', 797~ O, 2~ 2, 8, 2!, 20°' 20, 26,.- ~2. - ~!. 4!, ~5. ~5, 58,79' S .. 7a,79 S 94,29 S 117,03 S: 143,90 S . 175,94 S 21~6! $ 258,i2 S 369,03 S ~31~93 5 ,~9X~,lO S. 5Sa 25 S 620,67 $ 688,.57 S ~'~' 40 S 8/~8,93 S .... · 24 S 1!14,82 S 1202,10 S 1289-06 S 1375,26 S 1461,36 S i547,93 S 1634,24 S 1718,59 S 1801,16 S 18~8,94 S Iai aO $ ~091,29 2296.9~+ S 23~73 35~93 49,50 62,46 8~,0~ 102,24 i17,98 i36,42 i57,37 i 248~26 .: 264,74 267~74 270~69 273~09 275~10 275,09 272,93 270.34 266,35 26!~84 257,30 252,30 245,78 238~06 . 228,37 216.07 19S',91 - !77,06 !52,91 E E E- E E' E E E E E E E E E E E E E E E E D60n 3'700, 3900, alO0, 4200. .4500: 4700, 4~00~ 5000, 5200~ P'?OO', ~PO0 6!00. 6200, 6S00. 6&Qt. 6600, 6900, t ;',i T ER Pr'~,, ,,,_AT=''~.D ~.-'~" A TA - :.. T ."";" U !.~ ,,lOp? rD. E P T H t" '" TVD . . , ::CE' EVEN i00 FOOT I NT ERVAL S qFc,._, Sh_..A DFDTH .. ~.~,x ~, I NATES NORTH ~ NG EAST ~ NG 7999 8141 8281 8419 8.555 8690 882.5 8958 9087 9214 9340 9468 9598 972~ 9863 I O002 10144 10288 I0/+34 i~580 10727 10876 7i5'1, 7257, 735'7 · 7457, 7557~ 7657, 7757, 7.357. 795 '? * 8057~ 8t__, ~257. 835'7~ 8 a'5 '7, 8557~ 865'7~ 8757, 8957, 9157, 925'7, 843, 925* 962. i'" 1069, !I01, 1131, !158, 1212. 1273. 1307~ -.. _.! 346 ~ i '~ 8 ,.; · i432~ 1477 ~ 1524, i57i, 1619. 2399,52 S 2497~!9 S · 2590~92 S · ~80~84. S 276'7,04 S 2851 ~,/~4: S 2933,-'.48 S 3013~69 S --'~. ~" a. :5~ ¢v¢8~3 S 3t57~86 S 3226~32 . 3296,97 S 3368 ~ 36 S .. 3a98~65 S 356!~6! S '3623 · 58 S 3686~80' 3752.24 S 38i9~95 S 3889~26 S 3960~21 S I03~14 E 75,61E .' 45.~52 E i3,1! E 21,85 W 58~43 W 94,32 W !29,4t W 164~09 W !99,48 .W 235~48 W ~76~76 W B29,78-W 392~86 W 466~31'bi 5z+5~49 W 626,97 W 7!0~38 W 793~53 W 876,12 W 959.67 W .. 710( 72C( 730( 74O( '760( 770', 8 ~0~ 820' 85O 850 87O 9-~0 92O -) ~' AS!J~ D c p°r H I000 20~ anO0 4000 5000 5000 7000 8000 9000 i0000 · ]:NTERPOLATED - . DEPTH !000, 2000, 399a, ~897, 5690~ V!SV. 7888, 865~ DATA FOR SUB SEA DEPTH FOOT. I~''''''- ''''' ^ :,-~ b.R v.~,.,.,,c OF 'MEA~URFD'_ DE'P TH. ... 'TOTAL . :x~ 0 R T h I iS G !- CORD iNATES EASTiNG . 6.16 S 5,00 18 ,,'03 S 6.68 ~I,i7 $ 54.58 a57~27 S 215~9! !056~i9 S 275,6i 1709,'66 S 246,56 2399~84 S 128~20 ~038~47 S !05~62 3560~32 o 464~71 .1 2OO '0 2O0 40O 800 8O0 · 000 2OO ,400 6OO ~800 2000 2200 2400 2800 2800 3000 32'00 3400 3600 3800 4000 0 HORIZONTRL OlSPLRCEMENT 411:3.45 FEET PIT 8 14 0 10 P.'R 8 J E C T l ON HORIZONTflL B P ALASKR, I NC, PUT RIVER (22-]. 1-:1. ~-t3) SYMGOL OF SERVICE REPORT of SUB-SURFACE DIRECTIONAL SURVEY B. R ALASKA INC. f-2 ~ 22-ii-ii-J3 ) NAME _NORTH SLOP~~E, ALAS.KA JOB NUblr~ AM 101570.~ TYPE OF SURVEY S.S. DATE RADIUS' OF CURVATURE METHOD" ,D I ~ E C T I 0 BP,,..ALASKA WELL N A L ,S, U R V E Y p~-~,r--' , ........ : F-2 -. 22-11-11-13 WELL' COMPLE!,ION PREP SCS 12/,,11170 4EASURED O E V I A T I 0 N )EPTH ANGLE DIRECTION '[VD SUB SEA TOTAL COORDINATES C L 0 S U R E S DOG LEG SECTION LATITUDE DEPARTURE DISTANCE ANGLE SEVERITY DISTANCE }RIGIN LOCATED AT MD = 477 0 45' S 48E .... g4g 1421 0 15' S 43E 1893 0 15' S 61E 23'65 .........O- I5-' ........ S'-IFE 2910 1 O' S 1SE 3405 1 15' S 9E .... 3'&'76 ............... 2'-I5 ~508 3 30* S 17E ~511 5 ~5* S 48E 3601 ............. 3729 9 45~ S 47E 3885 13 30 ~ S 47E 4075 15 0 ~ S 35E 4170 17 15' S 34E -4262 ..... i-g- i5 432~ 21 15~ S 33E ~418 24 0 * S 32E .... ~'1'0 ..... 27'~~-' S 3oE 46~6 3l 15 ~ S 26E ~756 33 45' S 25E 4849 4942 33 15' 5025 31 45~ '-FII~ ...... 37, is' 5180 32 45' 5211 32 0~ .... 5242 '- 3~2-45~ .... 5297 '34 Om 5389 36 15' S 25E S 1SE S 14E S 7E S IOE S--FE S 5E S OE 0.00, TVD = O. 476.95 420.23 1420.89 1364.17 1892.89 1836.17 Z:3-8-~;-Sg ....... -2~0-8";-I7 2909.85 2853.13 3404.75 3348.03 '3~b.~Z'' 3~1~.~0 3507.68 3450.96 3540.57 3483.85 00, LATITUDE = 0,00~ 4,17S 4.64E i.igS 9,97E 9.35S 13,42E 10,61S 15.0qE .......... ---I~ ..... 17,98S 17.68E 27.48S 19.70E 31.22S 33.43S 3600:2'0 ......... ~~,~fi .............. 3'7:85S ...... 3726.82 3670.10 50.32S 3879.59 3822.87 71.76S 3972.99 ....... 3916.21 88.115 4064.14 4001.42 106.55S 4155.40 409~.6a 128.29S -~7A:2777 ......... ~1~;'05 4300.93 4244.21 4387.69 4330.97 44~0.63 4~13.'91 4606.71 4549.99 4682.61 4625.89 DEPARTURE = 0.00 6.24. S 47.99E 0.000 2.93 12.29 S '54.i9E 0.068 16.36 S 55.13E 0.116 5.85 18.41 S 54.78E 0.016 -0;0-4-5 ........... 25.22 S 44.52E 0.137 13.20 33.81S 35.64E 0.055 21.94: 19.76E 36.95 S 32.33E 4.772 25, 21.17E 39.58 S 32.34E 9.958 27.36: 26";T6E ............ ~'0-Y-S--~'~ .... 2~-0-91 --~0;~ 40.02E 64.29 S 38.49E 2.160 39,22.? 63.00E 95.49 S 41.28E 2.403 54.501 ~7.9~E Iii.b/ $ ~l.51E Z.lBZ 91,63E 140.53 S 40,69E 2.017 81.39 106,58E 166.79 S 39.71E 2,386 98.901 .......... ~S-----1-Z2-~8'gE-- --Ig5;4-9--~ 38.94E 2.20ff ......... 169.82S 134.89E 216.88 S 38.46E 3.413 132.41 200.32S 154,32E 252.87 S 37.60E 2,953 157o3~ Z3~.'~ZB lf~.~iE zgz.~z $ 36.71~ 5.6~ iU~,SL' 301.69S 210.58E 367.92 S 34.91E 2.852 242.22 345.33S 231.40E -415.69 S 33.82E 2.841 279.57 ~-;2-5 ...... 4702;53 ....... -Yg'5%]Y~S ..... 25:;~-6~ ---4-67~'S 32,83E 1'~1-2- ....---'5Z~- 4836.12 4779.40 440.51S 275.78E 519,71 S 32.04E 2.150 361 ~9 4906.12 48~9.40 482.36S 2gl.O1E ~563.35 S 31.IOE 6.713 398,, ~u~.'l""l "' ~92~" 531.3~S 303.bgE" -bi2,05 S 29.?~E ' 2,75i" ~42'~9 5035,81 4979.09 565.02S 309,92E .644,44 S 28,74E 6.680 473,94 5061,99 500~.27 581.43S 312,37E ~660,03 S 28,24E 5,718 489,28 5134.10 5077.38 626.03S 317.18E 703.58 S 26.79E 2.272 533.35 5209,3~ 515Z.62 680,89S 319.49E ~ 752,12 S 25,13E 3,968 584,11 I R E C T I C P.~ A L. S U R V E Y BP.. ALASKA ~ELL F-2: - 22-11-1'1-13 wELL COMP'LETION PREP SCS R'ADIUS? OF CURVATURE METHOD EASURED D E V I A T I O N EPTH ANGLE . DIRECTION 12/'11/7 0 '.::/ DOG LEG SEcTION:ii~I 5~83 38 45' S 3E TOTAL COORDINATES C L 0 S U R E S TVO SUB SEA LATITUDE DEPARTURE DISTANCE ANGLE 5283.91 5227.19 738.08S 320,98E 804.86 S 23.50E SEVERITY DISTANCE 3.292 639'26 695.36 5575 41 15' S 6E 5643 ........ ~[-'~-5"' ....S oe 5737 4.1 30' S 4E 5892 41 15' S 5E %080- ~I 0-' ....... S---2W 6204 40 45' S 2W 6422 40 45' S 2W ~'6II ...... ~0-~5' S 2~ " 6830 40 15' S 6W 7016 39 15' S 6W 7227 43 65' S 7W 7320 45 65' S ~ ~'4~-2 .... ~g'"'l~'-- S' 8~ 7535 46 0~ S 10W 7689 46 15' S 11W --~74 ........4~_.~1 .... __~ 12W 8061 44 45~ S 15W 8249 4,3 15' S 17W 'B~38 ..... ~'z---I-~r--- s 2tw 8563 42 15' S 22W 8751 41 45' S 23W '8844 41 'I-5-' ....... S--'2'5W 9032 38 O' S 27W 9206 38 0~ S 29W ~32~ .........3B"I5' S 9600 37 15' S 31W 9~32 37 15' $ '9528 ...... ]~'~I5· ..... -S-Ti-l~ ...... 9653 41 45' S 51W 5354.38 " ~WUE;~L 5475.58 5591.89 5733.51 5827.27 5992.42 6135.60 6302.12 6445.13 6603.85 6669.89 6]'33.80 6819.05 6925.79 529?.66 797.02S 325.62E 860.98 93~.5~ 8~Z.OUS 327.~0E ,~ ~03.62 5418.86 904.39S 330.16E .962.77 5535.17 1006.52S 338.205 1061.82 - --5~;-79 ....... 5770.55 1211.03S 327.82E ,.1254.61S 15.14E 5935.70 1353.26S 322.85E 1391.22 S 13.41E 60'f~.8~ .... Lq/6.~qS ~18.b4E ~iblu.~! 5 12.~E"- 6245.60 1618.56S 311.10E ,1648.19 S 10.88E 6388.41 1737.04S 300.74E 1762.88 S 9.82E 64~1"-f52 --~STE~3B~ .... ~gI';SI-E"---m'I'838.66S ...... g;~3-~-- - 654'?.1~ 1875.03S 284.49E ~1896.49 S 8.62E 6613.17 1939,965 275.94E 1959.47 S 8,09E 6617.08 '' '2o05.~7S 266;73k '~Z02].13 S 1.D[t 6762.3~ 2093.04S 252.86E 2108.26 S 6.88E 6869.07 2202.19S 232.63E 2214.45 S 6.03E S 22.22E 3.631 s ZO.O E 2.e 8 S 18.57E 0,455. 895.69~ 0.201 1096.69 0.000 1235.~ u.uoo 0,635 1496,30 0.872 1613'79 2.808 1751,6q~ 2.279 1816.70;~ 1.189 1970.861~ 0.695 2081.67, --7054.30 ..... 7185.95 7129.23 7321.18 7264.46 ~659.96 ?403.24 ' 7552.69 7~95.77 7692.20 7635.48 /761;~5 ..... 1705,I3 7906.64 7849.92 8042.18 7985.46 " ' 8136.~u "'80t~.86 .... 8196.67 8139.95 8222.14 8165.42 '82-9-~.-~ ----8-2~0%81 8392.57 8335.85 2461.72S 175.10E 2467.94 S 4.06E 2587.26S 139.11E 2590.98 S 3.07E 2108.525 91.35E .... ~ZllO,Z! S---2.O'~E 2786.72S 66.55E 2787.51S 1.36E 2902.9~S 18.41E 2902.99 S 0.36E ...... 29-59.-;-23S .......... 6,'65W ..... >-2-g-59,'~ .... -O-'-f2~ ...... 3066.97S 59.20W 3067.55 S 1.10W 3160.47S lO8.glW 3162.34 S 1.97W ~zz4.bZ5 145.v5w ~zz-/.~-S z. Svw 3264.51S 169.91W 3268.93 S 2.97W 3281.11S 179.89W 3286.04 S 3.I3W 1.258 2347.42 1.087 2~77.91 0.537 2688.98 0.444 2813.37 t.856 0.715 3093. i.049 ~/bS, t~ 1.315 3209.81 0,000 3228,12 3385.455 273.10W 3396.44 S 4.61W 5.561 3351,81 ~,RAD'IUS OF CURVATURE METHOD D I R E C T I 0 N A L .S U R V E Y P 3 BP. ALASKA W:ELL F-2 ~,~ 22-11-11--13 WELL cOMPLETION PREP, SCS 12/41/70 qEASURED D E V I A T I 0 N DEPTH ANGLE DIRECTION TVD SUB SEA TCTAL COORDINATES C L 0 S U R E S LATITUDE DEPARTURE DISTANCE ANGLE DOG LEG SECTION' SEVERITY DISTANCE[ 9808 42 45~ S 57W 10009 44 30' S 59W rC'ZZI .... ~ 4v o, S 6ow " 10568 49 O' S 60W PLUGGED BACK TO MD = -9~-65 ........ 3'7 45, . S 25w 9395 38 15e S 26W 9484 39 I5' S 2flW 9722 9878 10940 8507.30 8450.58 3446.67S 357.37W 3465.15 S 5.glW 2.680 8652.80 8596.08 3520.15S 474.96W 3552.05 S 7.68W 1.108 81VB.OZ .L u(~[.3O ~vS.SOS ~07.9~w 36~9.50 S 9.58W ' 2.i50 9025.67 8968.95 3729.45S 834.77W 3821.73 S 12.61W 0.000 9324, TVD = ~136.~8, LATITUDE = -3224.62, DEPARTURE = -145.95 816'8.99 8112.27-----3-2-4T. 365 lb6.gbW ~'~ZSl.l~ 5 Z. f6W ----~.OOO 8192.63 8135.91 3264.03S 164.50W 3268.18 S 2.88W 2.643 3431 · 50 3531.10 3820.76 3207.85 8262.04 8205.32 3313.67S 189.79W 3319.10 S 3.27W 40 45' S 42W 8445.01 8388.29 3436.61S 278.81W /3447.90 S 4.63W 43 45' S 54W 8560.4'7 8503.75 3506.65S 356.61W 3524.74 $ 5.80W 46 O' ~ S ~SW 8827.61 8'77(~ ....... 3'661,'11S / 573.14W ~705.70 S 8.89W 46 O' S 55W 9303.45 9246.73 3943.74S/ 976'78W ~4062'90 S 13.91W 1. 800 3262 0.625 ' -' O. 000 4062 CLOSURE 4062.90 S 13- 55' W [AD[U'S OF CURVATURE U R V E Y PAGE I ...... ~ INTER'PbLATE'D VALUES FOR-'E~E~--IOU-i~Et::~r-'O'F-'SUB- SEA DEPIH ~ METHOD BP ALASKA WELL F'~2 22-11-11-13 WELL COMPLETION PREP SCS ~i2/11/70 MEASURED DEPTH TVD TOTAL COORDINATES MD-TVD VERTICAL SUB SEA LATITUDE DEPARTURE DIFFERENCE CORRECTION 557 657 ...... 757 857 957 --1057 1157 1257 1'~57 1657 1557 1757 1857 --1'~57 2057 2157 22'57 2357 2657 --2557 2657 2757 -2'857' 2957 3057 3257 556,72 656,72 856'.72 956.72 ........ 1156.72 [256.72 1356.72 1456.72 1556.72 i6-'~."72 1756,72 1856.72 1956,72 2056,72 2156.72 225'6.72 2356.72 2456,72 2556,72 2656.72 2756,72 2956.72 3056.72 3156.72 3256.72 3357 3356.72 3A57 ............ 500.00 -4.68S 5.56E 1 600.00 -5.32S 6.67E 1 fuO.uO -5.~S 800.00 -6.60S 8.93E 1 900.00 -7.23S lO.03E 1 ' 1000.00 '--T.-'6~ 1100.00 -8.14S 11.49E 1200o00 -8.60S 12.22E 1 "' 1300~OO -9.065 lZ.~5~ 1 1400.00 -9,qq.s 13.55E 1 1500.00 -9.715 13.89E 1 1600.00 -9,g8~ ............ 14'.'23~ I 1700.00 -10.25S 1~.57E 1 1800.00 -10.51S 14.92E 1 ' 1900.00 -10.83S 15.2OE 1 2000.00 -11.17S 15.~6E 1 2100.00 -11.50S 15.71E 1 2200.00 -1'I,8~S ....... Ib'-~ I 2300.00 -12.18S 16.22E l 2400.00 -13.18S 16.49E 1 2500.00 -14.24S I6.15~ I 2600.00 -15.30S II.01E 1 2700.00 -16.36S 17.28E 1 '2800.00 -I-7~.~1S ..........I'T;-5-zi:E I 2900.00 -18.88S 17.87E 1 3000.00 -20.80S 18.28E l 3100.00 -2Z.12~ 16.6g~ l 3200.00 -24.64S 19.10E 3300.00 -26.56S 19.50E 1 ~4~ -2~6S ........ IgTS-6E .... I 0 0 0 0 0 U 0 0 o 0 0 0 0 0 o 0 0 0 0 o 0 0 0 · .................... -" ]I~rl"E"R-Pi3-[-J~rE O' VALUES ~AD.Iu$ OF CURVATURE METHOD BP ALASKA WELL F-2 22-11-11-13 WELL COMPLETION PAGE 2 PREP SCS 12/11/70 MEASURED TOTAL CCORD[NATES MD-TVC DEPTH TVD SUB SEA LATITUDE DEPARTURE DIFFERENCE VERTICAL CORRECTION ': 3557 3556.72 3500.00 3658 3656.72 3600,00 ..... 3T60 31bb.¢Z-- J¢OU.UU 3862 3856.72 3800.00 3964 3956.72 3900.00 4067 ..................4'-05~2-- -4000.00 4171 4156.72 4100.00 4277 4256.72 4200.00 .... ~"84 43'56;72' - 43'U0',00 4495 4456.72 4400.00 4609 4556.72 4500.00 ..... 4?25- ~6~g.-~2 ..... 4600.00 4846 4756.72 4700.00 4966 4856.72 4800.00 ~"~'0'~ 4956.72 4900.00 5205 5056.72 5000.00 5325 515'6.72 5100.00 -34.63S 22.53E 1 -43.42S 32.35E 2 -5~.52S 44.51E -68.5~S 59.56E 6 -85.26S 75.38E 8 -105.05S ......... g-o-.-5-2'E I-1 -128.65S 106,82E 15 -156.30S 125.77E 21 '~'-IB~.43S ...... 141o3~E -228.10S 171.37E ~9 -276.97S 197,44E 53 -330,'~S ........... 2'2WC-29E -391.49S 252.92E 90 -452.82S 280.26E 1~0 '" ~514.175 ' 299.24~ I-2'g- -578.13S 311.88E 149 -643.91S ~17.87E 169 -'544"9 ............... 52-S-E)-,-W2----52 00. O0 5578 5356.72 5300.00 5712 5456.72 5400.00 ..... ~845 5556.72 5500.00 5978 5656.72 5600.00 6111 5756.72 5700. '~'6243 '- 5856.72 ........ 5-8-00, 6375 5956.72 5900. 650'7 6056.72 6000. ---'6-63'g --6166.~Z 'bZOO, 6770 6256.72 6200. b901 6356.72 6JO0. O0 -ll50.OuS 32~.95E O0 ...... ;I236.3~S - 326.93E ......... O0 -1322.50S 323.92E O0 -1408,61S 320.92E OD -I~.555 ~t/.buE O0 -1579.84S 313.13E O0 -i663.79S 307.14E 70 31 ............... 6 z~5'6;-72--'----6-4~0 0 Ig-3 222 256 289 322 355 '3 87 419 451 514 545 l ?Z~'6; 79S 2~ ............... 5?5 0 1 6 11 14 16 21 2 o 20 20 2-4: -" 29 34 ' 33 32 31 ......... -30 ............ .ADIUS OF CURVATURE D I R E C T I 0 N A L ~" ~ U R V INTERPRO VALUES FOR EVEI~"IO-O- r~E- OF SUB METHOD BP ALASKA WELL F-2 22-11-11-13 Y PAGE SEA D~PTH WELL COMPLETION PREO SCS 12~[1/70 _ MEASURED DEPTH':, TVD 7163 6556.72 7301 6656.72 7589 6856,72 7734 6956.72 -T'BTT" ?056.72' 8019 7156.72 8159 7256.'72 '--'~9'7 8434 7456.72 8569 7556.72 SUB SEA MD-TVO VERTICAL DIFFERENCE CORRECTION 8837 7756,72 8967 '?856.72 ~O"g~' 7z~,72 9222 8056.72 9349 8156.72 9'~7~ ~.-72-' 9606 8356.72 9740 8456.72 --'9~76 8556.7z 10015 8656.72 10161 8756.72 -~'03[0 8856.72 10463 8956.72 9349 8156.72 --"9~'"/~' 8256.72 9607 8356.72 9738 8456.72 9873 8556.72 TOTAL COORDINATES LATITUDE DEPARTURE 6500.00 -1832.16S 289.75E 6600.00 -1926.99S 277.65E bioo~'oo 'Z'UZ~'.Oi5 Zb3.UUt 6800.00 -2131.56S 245.72E 6900.00 -2233.58S 226.25E 7000.00 ----23~z~-975 ........ 2-0-5.53~ 7100.00 -2433.05S 1~1.98E 7200.00 -2527.41S 156.27E ~300.00 -261~.30S 1ZB,41E 7400.00 -2705.68S 98.33E 7500,00 -2790.23S 65.09E 7600,00 '287~3-~--4-2-~ ~63E 7700.00 -2955.08S -4.80W 7800.00 -3029.82S -41.08W 7gO0.o0 "J~101.52S -~7.56W 8000.00 -3170.35§ -114.61W 8100.00 -3237.995 -153.98W 8200.00 -3303.13~- '--q95.89W 8300.00 -3364.20S -251.10W 8~00.00 -3419.68S -320.21W 8500,00 -34~1,635 8600.00 -3522.275 -478.55W 8700.00 -3576.22S -570.15W 8800.00 -3632.27S - -'666.45W 8900.00 -3689.79S -766.08W 8100.00 -3238.75S -152.54W 8200.00 ' -3309.805 lSF.BbW 8300.00 -3378.65S -232.80W 8400.00 -3443.715 -286.70W 8500.00 -3504.-"~ 8S ..... 607 32 645 38 6~9 44 733 44 778 45 821 ~ 863 42 903 40 ~qi 3~ 978 37 1013 35 1047 34 1081 ~4 1111 30 11%0 Zg 1166 26 1193 27 1-22-0 27 1250 30 1284 34 13ZU ~b 1359 39 1405 46 1454 49 1507 53 1193 -314 LZZt ZB 125i 30 1282 31 --'-I3I~ 35 D I R E C '1' I f] N A L U R V E Y INTERPOLATED VALUES FOR EV~-~---[O-O- r~: 'OF SUB SEA QEPTH ,AD[US OF CURVATURE METHOD BP ALASKA ~ELL F-2 . . 22-11-11-13 WELL COMPLETION PREP SCS 12/11/70 MEASURED TOTAL COORGINATES MD-TVD VERTICAL DEPTH TVD SUB SEA LATITUC'E DEPARTURE DIFFERENCE CORRECTION 10014 10155 10441 10585 9056.72 go00.O0 -10'729 ................ 9156.72 glO0.O0 10873 .g256.72 9200.00 8656.72 8600.00 -3562.30S -434.62W 8756.72 8700.00 -3620.12S -515.68W 8866.YZ UBUU.OO -5bl8.5~$ 8956.72 8go0.o0 -3737.79S -682.66W -3797.16S -767.48W -3856.58S-- ..... ~8~Z.31W -3915.98S -937.13W 1358 41 1399 41 i4~i 42 1485 44 1529 44 1-5-['3 44 1617 44 rADIUS OF CURg'ATURE D I R E C T I 0 ~ A L -''~ U R V E Y INTERPDL'Ai'ED VALUES FOR EVE~!-IOOb-~F~ET-OF MEASURED ,, ME'THDD BP ALASKA WELL F'2 22-11~11-13 WELL DEPTH · PAGE COMPLETION PREP SCS 12/I1/?0 MEASURED pEPTH TVD 1000 999.9I g43.Ig 2000 1999.89 1943.17 4000 3991.41 5000 4885.0~ '-' 6000 5~U5.--2-4 .... 7000 6432.83 8000 7143.00 .... g'O0~ ~Sz;O0 10000 8646.28 1000~ 8646.92 TOTAL COORDINATES MD-TVD SUB SEA LATITUDE DEPARTURE DIFFERENCE -7.~2S 10.34E 0 -10.97S 15.31E 0 -L~OS 18.ubE 0 -91.8~S 80.75E 75S 286.42E ~' 114 42S ....... ~3-,86E~ 3-2-6 85S 301.63E~' 567 60S 1BS.21E~ / 856 -bU.ZbW'cL--~ -469.70W ~-'~ 1353 -426.68W 1353 3934.69 4828.32 -469. 5616.52 6376.11 -1726. ?086.28 -2419. 18Zg'.ZB -3048.63S 8589.56 -3516.86S 8590.20 -3556.6qS VERTICAL CORRECTION 0 0 ---: 106 289 236 0 ,'ii 0 ! R E C T ! 0 N A L '),S U R V E Y PAGE I R"'V" PAGE 2 . ,: :: ~ :!~i! , ..~., ~.:. <.~, i.':< ',:,?' T~:. : 4:" <' LA'DIUS OF CURVATURE HETHOD BP ALASKA WELL F-2 22-11-11-13 HELL gOHPLETION PREP SCS SCS 12"i11/70 MEASURED DEPTH 9850 9852 'TVD 8536.26 8537.70 8539.15 9856 8542.05 9858 85~3.50 9860 '85'4~.~ 9902 8575.3~ 9904 8576.79 9906 857~.z~ .... 9908 8579.69 9910 8581.13 gg-~-- 8582.58 9914 8584.03 9916 8585.48 lOOZZ '8661.~0 10024 8663.07 10026 8664.44 TC"rAL COCRDINATES SUB SEA LATITUDE DEPARTURE -- ~"8479.5"~ ...... ~3~6-I-'305 "-380./?W 8480.98 -3462.035 -381.94~ 8482.43 -3462.76S -383.11W ~3..U8 "~3~3.~S "~.2~W 8485.33 -~464.22S -385.45W 8~86.78 -3464.955 -386o62W .... 84~ ...... ~3-A-65.685 8518.62 -3481.0~5 -~12.36W 8520.07 -3481.77S -413o53~ ~JSZl.52-- ~3~8Z'505'' 8522.97 -3~83.235 -415.87W 8524.41 -3~83.965 -417.04W 8525.86 .......... 8527.31 -3985.425 8528.76 -3~86.165 -420.55W '" 8604.98 -3~z4.~eS -4u3glzw 8606.35 -3525.70S -484.37W 8607.~2 -3526.44S -485.63W 8609-~0-g ....... ~nJb--"2-~lSS -486.88W 8610.46 -3527.92S -488.14N 8611.83 -3528.655 -489.39W 8997.1~ 8960.42 -3'724.545 -826.28W 8963.70 -3726.43S -829.55W 8966.98 --~3728.315 8993.1~ -3Y9~.145 -761.70W 8996.66 -3795.205 -764.65W ~uOo.15 '~379T.2~$ -76~'O0W 9003.60 -3799.335 -770.54W 9007.08 -3801.39S -773.49W 10028-8'665.8i 10030 8667.18 10032 8668.55 10550 9013;86 10555 9017.14 10560 9020.42 105'65 9023.70 10575 9049.90~ 10580 9053.38' 1UbU9 90~6'.U5, 10590 9060.32l 10595 9063-80 12/11/70' ETLON PRimP I BP ALASKA INC. State of Alaska Department of NatUral Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 2~ A NCHORAG e. ALASKA 99503 TELEPHONE (907) 277-1422 De cemb er 8, 19 70 ,~, Attention: Mr. Homer L. Burrell, Director Gentlemen: Monthly Reports Enclosed are monthly reports for the month of November, 1970, for our wells F-2 (22-11-11-13), N-2 (22-17-11-13) and B-3 (23-30-11-14). Very truly yours, Operations Manager gk Enclosures cc: New York DIVISION OF OiL AND GA5 ANCMO~AG~ F~m No. ~--4 REV. 3- I-?0 STATE O~- ALASKA OIL AND OAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS O?HEE 0IL ~-~ GAlS ['--'] WELL WELL 2. NAME OF OPERATOR SUBMIT IN DUPLICATE s./,bn~r~ss oF 0~'~T°i~ 4. LOCA~I~ON OF W'I~-LI. /-.,,, Sheet 2 of 2 LEASE DESIGNATION AND SERIAL NO. 9 WELL NO F-2 (22-11-11-13) 10. F~D ~ND POOL, OR WILDCAT -bY s~c., r., ~i.;'M.. (~Om'O~i Uo~ ' oa. mcTrv~ ,,, ~'~,MXT'ffo. ' ........... REPORT TOTAL DEPTH AT F_~D OF MONTH, CI-L~NG~ IN HOLE SIZE, CASING AND CEMF_~TING JOBS INCLUDING DEPTH SET A.N'D VOLUM]~ USED, PF~H.FOKATIONS, TESTS AND RESULTS. FISHING JOBS. JUnK IN HOLE A_ND SIDE-TRACKED HOLE ATCD ANY OTHER SIGNIFICANT CHANGE~ IN HOLE CONDITIONS. November;,' !970,,' 26.- 30' (COntinued) Set'cement plug from 9438'- 9152 With 130 sacks Class G with .1% D-65 and 20'.lb frac sand/sack Cement. WOC. Drilled out cement to 9336'. Ran turbodrill and sidetracked_hole to 9371'. x ... ~T~ Manac~er na'l~E December ~'970 , ~ ,,, - , r~ I- r'- 'i f~ ~ ~'~ ~ :~ ...., , oil and gas cofllervatJon commiflie bythe 15~ of the succNding mn~.mlefl otherwise directedDivislON OF C,~ AND GAS ANCI-IO~AG2 ,,~ F~wa No. P--4 R~V'. 3-1-70 STATE OF' ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS oil Im °'" I'-1 WI~LL WELL OTHEll 2. NAME OF OP~,RATOR BP Alaska'. Inc. 3. ADDRESS bF OP~TOR SUBMIT IN DUPLICAT~ Sheet 1 of 2 Ap~ NU,~EmC~L COD~- 50--029--20084 6 LEASE DESIGNA~ON AXD S~IAL NO. ADL '28'280 ?. IF INDIANr, AL~DT~EE OR TRIBE NAME ~.~IT rAr~ OR L~ASr Put River 9 WELL NO F-2 (22-11-11-13) P. 0. Box 4-CCC, .AnchOrage,'Alaska 99503 4. LOCA~ON' OF WELL At surface: 2888' WEL, 3172" SNL, Sec. 2, TllN, R13E, UPM 10. FLF~D~NDPOOL, OR WILDCAT Prudhoe Bay Sadlerochit 0il Pool I1. SEC.,T.,R.,M..(BOTTOM oaxr, crn,~ Sec. 11, TllN, R13E, UPM 12. PER.MIT NO. 70-56 13. REPORT TOTAL DEPTH AT END OF MONTH, CHA~NGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH SET AN'D VOL~ USED. PERFORATIONS. TESTS ~ RESULTS FISHING JOB~, JUNK IH HOLE A~ID SIDE-TH~CKED HOLE AND ANY OTHER SIGNIFICANT ~GES IN HOL~ CONDITIONS. CONFIDENTIAL . . . November, 1970 1 - 11 Drilled 12-1/4" hole from 2400' to 3466' and drilled directionally to 7343'. 11 - 12 Spotted 100 sack class "G" + 18% salt cement plug at 2210' and changed blow out preventerS to 20" 3000 psi WP rams and 2000 psi WP Hydril. Tested okay. 12 - 16 Drilled cement, plug and 12-1/4" deviated hole from 7343' to 9324'. Ran Dual Induction Log. Conditioned hole for casing. 16 - 19 Started running 9-5/8" 47 lb/ft N80 Seal-Lock casing. Ran 130 joints (5416 ft.) 9-5/8" casing when weight indicator indicated that string had parted. Pulled 73 joints. Ran spear and recovered remaining 57 joints. (Malformed pin pulled out'Of collar). Conditioned hole. Ran 168 joints of 9-5/8" 47 lb/ft. N80 Seal-Lock casing and 58 joints 13-3/8" 68 lb/ft K-55 seal lock casing. 9-5/8" shoe @ 9302', float collar @ 9262', 9-5/8" stage tool @ 4582', 9-5/8"- 13-3/8" crossover @ 2250', 13-3/8" stage tool @ 2167'. 19 - 21 Cemented 9-5/8" - 13-3/8" casing as follows: First stage - 1310 sacks Class "G" cement with 10% gel and 1-1/4% .D-65. Opened 9-5/8" stage tool and circulated cement returns to surface. Second stage - 622 sacks class "G" with 10% gel and 1-1/4% D-65. Circulated hole and obtained cement returns. Third stage - 2350 sacks Fondu-Fly Ash. Circulated cement to surface. 21 - 25 Nippled up and tested 13-5/8" 5000 psi WP BOP, drilled 13-3/8" and 9-5/8" stage tools and shoe joint. Drilled 8-1/2" deviated hole to 10568.' 26 - 30' Stuck String 40 ft. off bottom whilesurveying. Spotted pipe-lax and worked pipe. .Unable to free'. Lost circulation, unable to reverse circulate. Ran Dialog FPI and attempted to,back-off at .9502, 9471 then 9440 (successfully). Rec0Vereddrill pipe, 14 joints_heavy wall drill pipe and drilling jars. Left fish'between 9441.', and 10528~ consisting of:- 8-1/2,' bit, reamer, 26' monel drill collar, stabilizer, 18' monel drill collar., stabilizer, 12x30' drill collars, ~lX30'' joints hea~y wall drill_pipe. ' ~acenmer 1, 1970. ' ....... oil ofld g°$ coflservotbn commJflee by the 15~ of the succ~4ing ~n~, ~len otherwise directed. BP ALASKA INC. State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907) 277-1422 A-05954 November 30, 19 70 Attention: Mr. Homer Burrell Gentlemen: Well F-2 (22-11-11-13) Enclosed please find, in triplicate, Form P-3, Sundry Notices and Reports on Wells, for the above named well. This report contains our proposal to suspend the well pending design of production fac- ilities and downhole completion arrangements. The well status is outlined in the report. Very truly yours, BP m~~ · Operations Manager gk Enclosure cc: Operations Coordinator, NY Approved Cop~ Returr~ed Rrm ~o. ~'--~ STATE O1" AI. ASKA suBMrr ~. a- I-tO ~ APl N~EmC~'~ODE OIL AND GAS CONSERVATION CO~I~EE 50-029-20084 MONTHLY REPORT OF :DRILLING AND WORKOVER OPERATIONS 6 L~u%SE DESIGI~ATION AND S]~IAL NO. ADL 28280 1, 7. IF INDIA~, ALOT'I'EE OR TRIBE NAME 0IL [] O~.8 [~] OT~ WELL WEL~ 8. %~IT,F~ OR LEASE N~E Put River 2. NAME OF OP~%ATOR BP ALASKA INC, 3. ADbR~SS OF' oP~TO~t P. O. Box 4-CCC 4. LOCATION OF WELL ,,, Anchorage, Alaska 99503 SNL, Sec. 2, TllN, R13E, UPM At surface: 2888'WEL, 3172' g. WELL NO F-2 (22-11-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Sadlerochit 0il Pool 11. S,?,C.. T., R., M.. ('BO'I~FOM HOL~ Sec. 11, TllN, R13E, UPM 12. PER/HIT NO. 70-56 13. REPORT TOTAL DEPTH AT END OF MONTH. CI-tA~NGES IN HOLE SIZE, CASING AND C~-MENTING JOBS INCLUDING DEPTH SET A/krO VOL~ USED, PERFORATIONS, TE~TS AlkrD I{ESULTS. FISHING JOB~. JUNK IN HOLE AND SIDE-TRACKED HOLE AND A2qY OTHER SIGNIFICANT CH. ANU, ES IN HOI~ CONDITIONS. C O.N F I~D E N.T I AL October, 1970 . 23 - 25 Skidded.rig.from F-1 and rigged up. 25 - 28 Spudded at 0100 hours,.0ctober 25, 1970. Drilled 17%" hole to 2400'. 29 - 31 Opened .17½" hole to 26" to 2365'. Ran 60 joints 20" 133 lb/ft K55 Buttress casing to .2.321,.' Ran 1¼" API integral joint tubing outside 20" casing to 1802'. Cemented. 20" with 4700 sacks Permafrost II cement. Cement returns to surface. Nipp.led up. flow. line' cleaned out with 17½" bit to 2400'. Installed 13-5/8" BOPs and tested. SmN~ ~ OPERATIONS MANAGER DA~ NOVEMBER. 5, 19 70 NOTE--Report on this form is required for .each calendar month~ regardless of the status of operations, and must be filed in duplicate with tho oil and gas conservotlon committee bythe lath of Ihs suoceeding month, unlel8 otherwise directed. Form REV. 9-30-6 9 STATE OF ALASKA S~brntt "Intentions" in Triplicate & "Subsequent Reports" in Duplicate OIL AND GAS CONSERVATIO,N COMMITI'EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION 'FOi% P'ERi~i']]'-l~' 'for such 5. AP1 NLF~C;~L CODE 50-029-20084 ,, 6, I~SE D~IGNATION A/WD SERIAL NO. ADL 28280 7. IF INDIA.N, ALLOTTEE OR TRIBE NAME OIL ~ GAS ~--~ WELL WELL OTHER 2. NAME OF OPERATOR 8. UNIT, FA. Full OR LEASE NAME BP ALASKA INC. Put River 3. ADDRESS OF OPERATOR 9. ~b NO. P.O.Box 4-CCC, Anchorage, Alaska, 99503 F-2 ( 22-11-11-13 ) 4. LOCATION OF WELL At surface 2888' WEL, 3172' SNL, Sec 2, TllN, R13E, UPM 10. F~LD A~ID POOL, OR WILDCAT Prudhoe Bay Sadlerochit Oil Pool 11, SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 11, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc. 12. PEI~VIIT IN'O. KBE 56.74 ft AMSL 70-56 ,4. Ch~ck Appropriate Box To [ndi,cate N',ature of N~ti'ce, Re. ~ort, or Other D~ta ' NOTICE OF INTENTION TO : TEST WATER SHUT-OFF PULL OR ALTER CASING __} FRACTURE TREAT MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ABANDONS REPAIR WELL CHANGE PLANS ~Other) Suspend , ,. , SUBSEQUENT REPORT OF: WATER 8IIUT-0FF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ~, ASANDONMEN'T$ (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated data of starting an}' proposed work. We propose to suspend our subject well pending design of production facilities and dowrahole completion arrangements. The well status will be as follows: Total Depth : Approximately 10800 ft in 8~a in. hole. Last Casing : 7" o.d. 29 lb/ft NS0 X-line liner from T.D. to approximately 8800 ft. This will provide an overlap of 500± ft inside the 9-5/8" casing set at 9302 ft. Cemented With : Approximately 350 sacks Class 'G' cement. The 13-3/8"/9-5/8" casing string will contain diesel from 2500 ft to surface. The wellhead will be capped and filled with diesel. The 7" liner will not be perforated. 16. I hereby certff, ~/~i:. , an correct SIGNED COHDITION~ ~ tPPROVt~, IF A~: TITLE OPERATIONS MANAGER TITLE . ~/i/'~/ 4 · See Instructions On Reverse Side DATE NOV. 26,19 70 Approved Copy Returned ... ./d, l BP ALASKA INC. P.O. BOX 4-CCC: 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE. ALASKA 99503 TELEPHONE (907} 277-1422 A-05671 October 21, 19 70 State of Alaska Department of Natural ResoUrces Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer Burrell, Director F-2 (22-11-11-13) Enclosed please find Form P-3, Sundry Noties and Reports on Wells, in triplicate, for the above named well indicating a change in the bottom hole location and a change in the Unit well designation number. Enclosures cc: New York Very truly yours, ~ A~S= ~2 Operations Manager Form P--3 / ~ S~,bmtt "retentions" in Trtpncate ----[ C. ENO"~ STATE OF A~KA --["1' EN~_i _ 5. APl N~C~ COD~ OIL AND GAS CONSERVATION CO~I~EE SUNNY NOtiCES AN~ ilE'POETS ON W~ (Do not use this Ion (or proposals ~ drill or to deepen ~.~ "~cA~oN'~o~ ~'Z~r~='' ~o~ ..=~'~o.~ ~L 28280 WELL ~ OTHER _ BP ~AS~ INC. Put River 3. ADD~ESS OF OP~KATO~ ~. ~L NO. J ~C P 0. BOX 4-CCC ~chora~es ~aska 99503 ~ F-2 (22-11-11-13) CONFER: . , . .. 4. LOCATION OF W~L 10. F~ ~D POOL, OR WI~CAT ~u~ 2888 ~L~ 3172 SNL. Sec. 2~ TllN. ~3~ ~M Prudhoe Bay (Sadlerochit O~l'Po01) 11. SEC., T., R., M., (BO~OM HO~ O~E~IVE) Sec 11~ TllN~ R13~ . 13. ELEVATIONS (Show whether DF. RT. GR. etc. 12. P~T Est KBE 58 ft. AMSL Check Appropriate Box To I,ndkate N~t'ure of N~tice, Re~ort, or Other Date ' NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE ABANDONS CHANGE PLANS iOther) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT~ (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertineut details, and give pertinent dates, including estimated date of starting any proposed work. Further to our Application to Diill dated October 8, 1970, =our letter of October 14, 1970 and the telephone conversation between Marshall and Kron of October 20, 1970, we now wish to advise that the bottom hole location for well F-2 has been revised to: 3300 WEL, 1620 SNL Sec. 11, TllN, R13E, UPM, which means the Unit well designation reverts to 22-11-11'I3. SIGNED H.J. ~~e :: TITLE OPERATIONS MANAGER DATE OCT. 21, 19 70 , (This space for State office use) APPROVED BY CONDITION8 OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side Approved Copy Returned Hr. H, ~. Cllrke EttC~ ts ~ ~ 111~t t~'tlo, for ~e~ltt ~I1,, o. or ~ ~ 7, t970, ~t' t ~o. l. S~'tll 2, Toen~tp t tit, ~I1 Sllpt~ and core ~lt [ ~ [ req~l~, ii. dlttltctiolIt ~y Iit rlqttlred. J r!ve~s 1. At~tt~ Ill their d~lnlge lyStelS have tmen tirol fl.. ~It!e }, .At.~ ~-~.t~~ ~), ~I~ ~ ~1~. ~tt~ ~~ ~ ~I~ ~l~~t ~f-l:=. ~ of FI~ ~ ~.. I018 I~r~l~I the event ~ svspemlon-or tlmn4elimt please notify ftttl office adlq~tely l . . ~ [. BP ALASKA INC. P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907) 277-1422 A-05644 October 14, 19 70 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director F-2 (21-11-11-13) In reference to our letter to you, No. A-05642, dated October 9, 1970, with an Application for Permit to Drill enclosed for BP well F-2 (22- 11-11-13), please note that the well number Was typed incorrectly on the Application as well as the form attached and the cover letter. The correct well number should read F-2 (21-11-11-13). Please change the well number on the Application accordingly before your approval is made. Very truly yours, ons Manager gk cc: New York lc. .... I' c. [NO ........ 7./ I 1 ENG ...... I~ ~N~I . la ~E°~I ......... I ~v I CONFER: BP ALASKA INC. State of Alaska Department of Natural Resources DiviSion of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-CCC 121 WEST FIREWEED LANE, SUITE 205 ANCHORAGE, ALASKA 99503 TELEPHONE (907) 277-1422 A-05642 October 9, 19 70 Attention: Mr. Homer L. Burrell, Director Gentlemen: F-2 (22-11-11-13) Please find the following enclosed herewith: 1. Application for Permit to Drill well F-2 (22-11-11-13). 2. Our check in the amount of $100 to cover the permit filing fee. 3. Three copies of surveyor's plat showing well location. Please note that in oUr letter to you dated August 27, 1970, No. A04124, we enclosed copies of two letters to State of Alaska, Division of Lands, requesting approVal to drill on this location and advising of a change in pad design. Very truly yours, gk Enclosures cc: New York BP ALASKA INC. ~~"'-OPerat:Lons Manager STATE O,F ALASKA SUBMIT IN '1~ (O~her instructions reverse ~ide) OIL AND, GAS CONSERVATIO. N ,COMMITTEE APl No. 50-029~20084 6. LE~S~ D~;IIGNAT1ON AJW-D SERIA~ NO. ~L 28280 7. IF I~I~, ~~E OR ~BE N~ 8. UNIT~FARM OR LEASE N~ME Put R2ver 9. W~L NO.~ 10, ~ELD AND POOL, OR WILDCAT Prudhoe Bay (Sadlerochit 0il ,,. SEC.. ~., ~., ~., (~o~o~ Pool) [SS om~cTxvz~ 11, Ti~, R13E, ~M 12. O i]"¥ 1<' . DIVI~ION OF CU, /~]'qa GA~ APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK DRILL I~] DEEPEN [--1 PLUG BACK [-] b. TYPE OF WtLL O,L [] °'" r-i WELl, WELL OTHIRR ZONE ZONE 2 NAME OF OPERATOR BP ALASK~ INC. 3. ADDRESS O~F OPERATOR P. O. Box 4-CCC _~chorage, Alaska 99503 LOCATION OF WELLAt surface 2888 WEL, 3172 SNL, Sec 2, TllN, tLI3E, UPM At proposed prod. zone 3300 WEL, 660 SNL, Sec 11, TllN, R!3E;,,~;UPM 13. DISTANCE IN MILES AND DIRECTION F.%OM NEAREST TOWN OR.POST O~FICE* 105 miles NE of Umiat 14. BOND INFOH2VEATION: State of Alaska DL-11 RE'CE:V · TYPE Blanket 15. DISTANCE PROM PROPOSED* I LOCATION TO NEAREST 660 ' from North side le. No. or ACX~ IN'LEASE PROPERTY OR LEASE LINE, FT. of lease (Also to nearest drig, unit, if any) 18. DISTANCE FROM PROPOSED L~A~ON* TO NEAREST WELL D~ILLING, COMPLETe, I OR APPLIED FOR, ~. 5960' from J-2 (23-10-11-13),, [ 9115 T~ 21. ELEVATIONS (Show whether DF, RT, ~R, etc.) Surety and/orNo. Federal Insurance Co. 8016-77-14^~cn°"Aa" ~o~t $100 000 [7. NO. ACRES ASSIGNED TO THiS WELL Estimated KBE 58' amsl 2§. P~OPOSED CASING Ai~I'D CEMENTING ~ROGRAM A c,k¢- y Sno~. frost 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WIIA., ,~TART* November 7, 1970 SIZE OF HOLE SIZE OF CASING WEIGHT I~ER FOO~ t GP. AI)~ S~'I~I~TG DEPTH qCANTIT! O1~ C~MZN~ ,_ 36 , 30 Stove Pipe 95 95 250 sks permafrost II ~<~ 26 20 133 ,,...., K55 230.0 2300 4000'3. permafrost II or Fon~6/Fly ..... 12% 13-3/8/9-5 8, ,68/47 K55,/N8(8810 ' 81'10 4200'° Ciass'G w/gel, salt or per~ 8% 7 ,,, 2,9 .N80, 8310.-,999,5 ~69C-9115 300'3 Class G ~,-/[~ '~ n~ ~, T~ , Reason for Deviation: Geological Forecast: To minimize rig moves and possible damage .to the tundra and to facilitate the construction of offtake facilities. TVD BKB Quaternary and Tertiary Gravels, sands, silts and clays Surface - 4180 Cretaceous Mudstones with silts and sands decreasing downwards 4180- 7290 3urassic Shales and siltstones 7290 - 8410 Triassic (Sag River) Glauconitic Sand 8410 - 8440 Triassic (Sh~b-lik) ] _ Shale~" and: LimestOnes ' ' 8440 -- 8500 Triassic (~adlerO~hi~//. San~.;e6ngtomerates · and'.-'min'or shales 8500 '- 9115 - '-- "-. ' z~~~,-' ' ~ , ~ ~// ~ (Th'is ,pac~; S~f/[ee U.' COND~ONS O~ ~V~: W ~: ~- [ SAMPL~ND CORE CHIPS "~U~ ~ ~~: ' ' a v~ ~o, SEE T~NSMITTAL LETTER.  DI~ION~ SURVEY R~~ A.~.L ~C~ COD~ '~( "" *~, I.~., O. Rever~e Side October 23, !97.0 October 23, , , 1970 Dry bucket 36" hole to about 80 feet below ground level and cement 30" conductor to surface using Permafrost II or Fondu/Fly Ash cement. Drill 17-1/2" hole and open to 26" to about 2300 feet and cement 20" casing to surface using Permafrost II or Fondu/Fly Ash cement. D~ill 12-i/4" hole under directionai/-c°nditions to approximately 8110 feet TVD (est. 8810' DD). Cement 13-3/8"/9-5/8" casing in stages with Class G/gel and Class G/salt or Pe~nnafrost cement. Drill 8-1/2" hole under directional conditions to T.D. at approxi- mately 9115 feet TVD (est° 9995' DD). Cement 7" liner to approxi- mately '500 feet inside 9-5/8" shoe with Class G cement. Suspend for later completion. Blowout preventer program is 3000 psi pipe rams, blind rams and Hydril from 20" casing point~ and 5000 psi pipe rams, blind rams and Hydril fr~m 9-5/8" casing point. We do not expect to penetrate any gas bearing formations above the 9-5/8" setting depth. ANCI-;ORAG~ i O3 ,,-J l! N. i i ?)3 SO 40 license~~ to Free,ice lond survey~n9 in ~he S(dfe of Al::~sko ond this p~'~ represents a locotion survey n':;do byre8 or Ddte SURVEYOR CHECK LIST FOR NEW WELL PERMITS Yes No Remarks . Is well to be located in a defined pool ...... - ........... y~ ,. Do statewide rules apply " mx · · · · · · · · · · · · · · · · · · · · · · · · · . I registered sur~ey plat attached · S a . Is well located proper distance from property line . .'. .............. . Is well located proper distance from other wells ........... . Is sufficient unded)~ted acreage available in this pool well to be deviated Is ' ' ' · · · · · · · · · · · · · · · · · · · · · · · · · · · Is operator the only affected party ....... . ..... Can pemit be approved before ten day wait · m · · · · · · · · · · · · · · · O. Does operator have a bond in force .... _ ........... . .... 1 Is conductor string provided ' · · · · ~ · · · · · · · · · · · · · · · · · · 2. Is enough cement used to circulate on Conductor and surface . . .' . . . 3. Will cement tie in serface and intemediate or production strings .... ./ 4. Will cement cover all possible productive horizons ........... /~/ 5. Will surface casing cover all fresh water zones ............ - 6. Will surface csg. iRternal burst equal .5 psi/ft, to next string .... 7. Will all casing give adequate safety in collapse and tension ...... 8. Does BOPE have sufficient pressure rating ............... ~dditional Requirements: ~o/~. ~,0, ~-8-~ ~ Approval Rec~neended: , H~ LCS Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding informatiOn, information of this. · nature is accumulated at the end of the file under APPENDIX.' .. No Special'effort has been made to chronologically.' organize this category of information, F - 02 PRUDHOE BAY :::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::: ......... . .... ,. ............. ~ ........ :::::::::::::::::::::::::::::::::::::: ...... ;:.~;~.~..~ ................ Run 1: 17 - DEC - 1995 CNIGR Cased Hole M/ESTE~ ATLAS 9800 10784 Logging Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSH I P: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD F-02 500292008400 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 10-JAN-96 5'852.02 K. BRUNNER S. WHIPP 2 liN 13E 3172 2888 56.74 0.00 0.00 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 9302.0 3RD STRING 7.000 10928.0 PRODUCTION STRING 5.500 8703.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 25-0CT-70 SWS BASELINE DEPTH 9786.0 9794.5 9808.5 9818.5 9837.0 9855.0 9863.0 9908.5 9947.5 9954.0 9961.0 9964.5 9982.5 GRCH 9788.0 9796.5 9811.0 9820.5 9839.0 9856.5 9864.0 9911.0 9951.5 9958.5 9965.0 9968.5 9986.5 EQUIVALENT UNSHIFTED DEPTH 47.00 26.00 17.00 9996.0 10010.0 lO011.O 10015.5 10016.5 10021.0 10022.5 10029.0 10030.0 10030.5 10040.5 10041.5 10052.0 10086.5 10092.5 10094.0 10097.0 10098.0 10101.0 10106.0 10107.0 10184.0 10185.0 10194.5 10210.0 10214.5 10354.0 10407.0 10414.5 10415.5 10416.0 10416.5 10418.0 10419.0 10419.5 10429.0 10430.0 10446.5 10468.0 10526.0 10560.0 10560.5 10561.5 10562.0 10563.0 10565.5 10586.5 10597.0 10601.5 10603.0 10617.5 10619.0 10619.5 10634.0 10635.0 10640.5 10675.0 10676.0 10678.5 10679.5 9999.0 10013.5 10014.0 10018.5 10019.0 10023.5 10025.5 10032.0 10032.5 10033.5 10043.5 10044.0 10054.5 10090.5 10096.5 10098.5 10101.5 10102.0 10105.0 10110.0 10110.5 10187.5 10188.0 10198.5 10213.5 10218.5 10358.5 10411.5 10419.0 10419.5 10420.0 10421.0 10422.5 10423.0 10424.0 10433.5 10434.0 10449.5 10472.0 10530.0 10563.5 10564.0 10564.5 10565.0 10565.5 10568.0 10590.0 10600.5 10605.0 10605.5 10621.5 10623.0 10624.0 10638.5 10639.0 10644.0 10679.0 10679.5 10682.0 10682.5 10680.0 10681.0 10682.0 10686.5 10687.0 10690.5 10691.5 10693.5 10695.0 10719.0 10737.0 10750.0 10755.5 10756.0 10757.0 10761.0 10765.0 $ 10683.5 10684.5 10685.0 10689.5 10690.5 10694.0 10694.5 10696.5 10697.0 10721.5 10740.0 10752.5 10759.5 10760.0 10760.5 10764.5 10768.0 CN/GR Cased Hole. TIED INTO 06-DEC-70 SONIC. WELL HAS BEEN SHUT-IN FOR COUPLE OF MONTHS DUE TOHIGH GAS. PUMPED 200 BBL SEAWATER & 15 BBL METHANOL BEFORE LOGGING. START WHP WAS 100 PSI, ENDING PRESSURE WAS 1000 PSI. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT $ DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 0.5000 START DEPTH STOP DEPTH 9786.0 10770.0 9800.0 10784.0 PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 (MEASURED DEPTH) BASELINE DEPTH NPHI 9808.5 9811.0 9818.5 9820.5 9837.0 9839.0 9847.5 9850.0 9855.0 9856.5 9863.0 9864.0 9908.5 9911.0 9941.5 9945.0 9947.5 9951.5 9954.0 9958.5 9961.0 9965.0 9964.5 9968.5 9982.5 9986.5 10026.0 10029.0 10046.5 10050.0 10092.0 10095.0 10100.5 10104.0 10149.5 10153.0 10192.5 10195.0 10210.0 10213.5 10214.5 10218.5 10354.0 10358.5 10407.0 10411.5 10414.5 10419.0 10415.5 10419.5 10416 . 0 10420 . 0 10416.5 10421.0 10418.0 10422.5 10419.0 10423.0 10419.5 10424.0 10429.0 10433.5 10430.0 10434.0 10446.5 10449.5 10468.0 10472.0 10526.0 10530.0 10560.0 10563.5 10560.5 10564.0 10561.5 10564.5 10562.0 10565.0 EQUIVALENT UNSHIFTED DEPTH 10563.0 10565.5 10586.5 10597.0 10601.5 10603.0 10617.5 10619.0 10619.5 10634.0 10635.0 10640.5 10675.0 10676.0 10678.5 10679.5 10680.0 10681.0 10682.0 10686.5 10687.0 10690.5 10691.5 10693.5 10695.0 10719.0 10737.0 10750.0 10755.5 10756.0 10757.0 10761.0 10765.0 10767.0 $ 10565.5 10568.0 10590.0 10600.5 10605.0 10605.5 10621.5 10623.0 10624.0 10638.5 10639.0 10644.0 10679.0 10679.5 10682.0 10682.5 10683.5 10684.5 10685.0 10689.5 10690.5 10694.0 10694.5 10696.5 10697.0 10721.5 10740.0 10752.5 10759.5 10760.0 10760.5 10764.5 10768.0 10772.0 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH1B. OUT $ CN : BP EXPLORATION WN : F-02 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: (ALASKA) API API API API Log Crv Crv Name Tool Code Samples Units Size Length Typ.Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 I 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 42 Tape File Start Depth = 10805.000000 Tape File End Depth = 9770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10356 datums Tape Subfile: 2 316 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 2 .DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9786.0 2418 9-800.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 9788.0 9789.0 9788.0 9790.0 9792.0 9797.5 9799.0 9801.5 9804.0 9806.5 9816.5 9819.0 9849.0 9850.5 9850.0 9851.0 9852.5 9853.0 9854.0 9858.5 9859.5 9860.5 9861.5 9863.5 9864.5 9864.5 9865.0 9865.0 9866.0 9866.5 9867.5 9867.5 9868.0 9868.0 9869.0 9871.0 9872.0 9880.0 9880.5 9883.0 9884.0 9886.5 9887.0 9892.0 9892.5 9896.0 9897.0 9897.5 9898.5 9899.5 9902.0 9904.0 for each run in separate files. STOP DEPTH 10770.0 10784.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 9794.5 9804.0 9854.5 9855.0 9855.5 9860.0 9860.5 9861.5 9862.0 9868.0 9881.0 9882.5 9885.0 9885.5 9888.0 9889.0 9894.0 9895.0 9898.5 9899.0 9899.5 9900.0 9901.0 9906.0 9906.5 9907.0 9911.0 9912.0 9913.0 9913.5 9915.5 9921.0 9925.5 9927.5 9928.5 9929.0 9929.5 9930.0 9931.5 9940.0 9945.5 9947.5 9948.0 9952.0 9953.0 9954.0 9958.0 9960.0 9961.0 9967.0 9968.0 9969.0 9977.5 9978.0 9979.5 9980.5 9988.0 9989.0 9990.0 10000.5 10002.0 10002.5 10003.5 10004.5 10006.0 10007.0 10011.0 10012.0 10015.0 10015.5 10016.0 10016.5 10017.5 10018.5 10020.0 10020.5 10021.0 10022.0 10031.0 10031.5 10032.0 10033 .~0 10034.0 9915.0 9916.0 9918.0 9933.0 9934.5 9949.0 9951.0 9952.0 9964.0 9964.5 9981.'0 9982.0 9983.5 9984.0 9992.5 9993.0 10005.0 10006.0 10007.0 10007.5 10018.0 10018.5 10023.0 10024.0 9908.5 9909.0 9910.0 9914.0 9914.5 9915.0 9922.5 9928.0 9930.0 9930.5 9931.5 9932.0 9933.0 9943.0 9952.0 9956.5 9957.0 9957.5 9961.5 9971.5 997215 9973.0 . . 9992.0 10004.0 10009.5 10010.0 10014.0 10014.5 10018.0 10019.5 10020.5 10021.0 10022.5 10023.5 10024.0 10024.5 10033.5 10034.5 10035.0 10035.5 10036.0 10034.5 10036.5 10037.5 10038.5 10039.0 10045.5 10051.5 10052.0 10052.5 10060.5 10064.5 10067.0 10067.5 10083.5 10084.5 10087.0 10087.5 10088.5 10094.5 10095.0 10095.5 10096.5 10106.5 10107.5 10137.0 10139.0 10140.0 10141.5 10147.0 10147.5 10149.0 10149.5 10150.0 10151.0 10152.0 10154.5 10155.5 10156.0 10178.5 10183.0 10183.5 10184.0 10192.0 10195.0 10201.0 10202.0 10202.5 10203.0 10204.0 10205.0 10206.5 10208.5 10212.5 10213.5 10214.5 10216.0 10217.0 10218.0 10220.5 10221.5 10040.5 10041.0 10054.0 10054.5 10092.5 10110.5 10198.5 10204.5 10205.0 10206.0 10206.5 10207J0 10208.0 10210.0 10217.0 10217.5 10036.5 10039.5 10042.0 10049.5 10056.0 10063.0 10067.0 10069.5 10070.5 10086.5 10087.0 10089.5 10090.5 10097.5 10098.5 10099.0 10099.5 10109.5 10110.0 10140.0 10142.0 10142.5 10144.0 10150.0 10151.0 10152.5 10153.0 10153.5 10154.5 10155.0 10157.5 10158.0 10158.5 10182.0 10186.5 10187.5 10188.0 10194.0 10211.5 10215.5 10220.5 10221.5 10222.0 10224.5 10225.0 10223.5 10224.0 10235.0 10248.0 10248.5 10251.5 10269.0 10269.5 10270.5 10271.5 10275.0 10275.5 10277.5 10278.5 10286.0 10287.0 10301.0 10306.0 10308.5 10344.0 10349.5 10350.5 10362.0 10378.0 10387.0 10399.5 10406.5 10408.5 10411.5 10414.0 10414.5 10418.0 10419.0 10421.0 10422.0 10422.5 10423.5 10424.0 10427.0 10428.0 10428.5 10429.0 10429.5 10430.0 10430.5 10433.5 10434.5 10437.0 10438.5 10455.0 10459.5 10460.0 10463.5 10472.5 10473.5 10506.0 10507.0 10517.5 10519.5 10520.0 10251.5 10411.0 10418.5 10419.0 10426.5 10427.0 10427.5 10434.0 10442.0 10457.5 10468.0 10477.0 10477.5 10510.0 10510.5 10227.0 10228.0 10239.0 10252.5 10256.0 10273.0 10274.0 10275.0 10275.5 10279.0 10280.0 10282.0 10282.5 10290.0 10290.5 10305.5 10310.0 10312.5 10348.5 10354.0 10354.5 10365.0 1038210 10390.0 10403.5 10413.0 10416.0 10421.0 1042210 10424.5 10427.0 10428.0 10431.0 10431.5 10432.0 10433.0 10433.5 10434.0 10437.0 10437.5 10440.0 10463.5 10464.0 10520.5 10522.5 10523.5 10524.0 10527.5 10528.5 10529.0 10530.5 105.34.0 10561.5 10570.5 10576.5 10585.5 10587.5 10596.0 10596.5 10597.5 10619.0 10633.0 10634.5 10635.5 10640.5 10641.0 10644.0 10685.0 10686.0 10689.5 10690.5 10691.5 10692.0 10692.5 10693.0 10694.0 10722.0 10744.0 10750.5 10751.0 10761.5 10763.0 10766.5 $ 10528.5 10532.0 10532.5 10533.5 10535.0 10537.5 10564.5 10573.5 10581.0 10589.5 10592.5 10600.0 10600.5 10601.0 10623.0 10637.5 10639.0 10639.5 10644.0 10645.0 10648.0 10687.5 10688.5 10693.5 10694.0 10694.5 10695.0 10696.0 10696.5 10697.0 10724.5 10746.5 10753.0 10753.5 10765.0 10767.0 10769.0 PASS 2. FUCT &NUCT WERE SHIFTED WITH NPHI. / ? ?MATCH2A. OUT / ? ?MATCH2B. OUT $ CN : BP EXPLORATION WN : F-02 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: (ALASKA) Name Tool Code Samples Units .. API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 i CPS 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 42 Tape File Start Depth = 10805.000000 Tape File End Depth = 9770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10356 datums Tape Subfile: 3 330 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - START DEPTH STOP DEPTH 9786.0 10770.0 9800.0 10784.0 PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 (MEASURED DEPTH) BASELINE DEPTH GRCH 9779.5 9781.5 9788.0 9790.0 9797.5 9799.0 9802.0 9831.0 9849.0 9850.5 9850.0 9851.0 9855.5 9863.5 9864.5 9864.5 9865.0 9865.0 9866.0 9866.5 9867.5 9867.5 9868.0 9868.0 9869.0 9871.0 9872.0 9880.0 9882.5 9883.5 9891.0 9892.0 9893.5 9894.5 9895.0 9896.0 9897.0 9898.0 9902.0 9904.0 9906.5 9912.5 9913.0 9915.0 9913.5 9916.0 9914.0 9915.5 9918.0 9924.5 9928.5 9929.5 9930.0 9933.0 EQUIVALENT UNSHIFTED DEPTH NPHI 9805.0 9833.5 9858.0 9883.0 9885.5 9886.0 9893.5 9894.0 9895.5 9897.0 9897.5 9898.0 9898.5 9899.5 9910.0 9916.0 9916.5 9928.0 9932.0 9932.5 9930.5 9931.0 9931.5 9943.0 9945.5 9947.5 9948.0 9955.0 9960.0 9961.0 9970.0 9976.5 9977.5 9978.0 9979.5 9980.5 9983.5 9989.0 9990.0 10002.0 10002.5 10003.0 10003.5 10004.5 10012.0 10013.0 10014.5 10015.0 10016.0 10016.5 10018.0 10019.0 10019.5 10020.5 10021.0 10032.5 10034.0 10037.5 10038.5 10046.0 10050.5 10051.5 10052.5 10060.0 10068.0 10082.5 10083.0 10084.0 10084.5 10085.0 10087.0 10088.0 10088.5 10094.5 10095.0 10096.0 10097.0 10106.-5 10107.5 10120.5 9934.5 9949.0 9951.0 9952.0 9964.0 9964.5 9981.0 9982.0 9983.5 9984.0 9992.5 9993.0 10005.0 10006.0 10007.0 10007.5 10018.0 10018.5 10023.0 10024.0 10'040.5 10041.0 10054.0 10054.5 10092.5 10110.5 9933.5 9934.5 9935.0 9947.5 9959.5 9975.0 9981.0 9987.5 10006.0 10006.5 . 10015.5 10016.0 10017.5 10020.0 10021.5 10022.0 10023.0 10036.0 10036.5 10049.0 10053.5 10054.0 10063.0 10071.0 10086.5 10087.0 10087.5 10088.0 10089.0 10091.0 10091.5 10098.0 10099.0 10100.0 10100.5 10110.0 10110.5 10125.0 . 10121.5 10122.5 10123.0 10137.0 10138.0 10147.0 10147.5 10148.5 10154.5 10155.5 10156.0 10171.0 10182.5 10195.0 10195.5 10201.0 10202.0 10202.5 10203.0 10204.0 10205.0 10206.5 10207.0 10213.5 10214.0 10214.5 10222.0 10223.5 10224.0 10224.5 10225.5 10226.0 10248.5 10268.0 10269.0 10269.5 10270.0 10270.5 10276.0 10282.0 10289.0 10349.0 103 52,0 10371.0 10375.5 10387.0 10391.5 10395.0 10406.5 10409.0 10414.0 10414.5 10418.5 10422.0 10422.5 10423.5 10428.0 10430.0 10436.5 10438.5 10198.5 10204.5 10205.0 10206.0 10206.5 10207.0 10208.0 10210.0 10217.0 10217.5 10251.5 104'11.0 10418.5 10419.0 10426.5 10427.0 10427.5 10434.0 10442.0 10126.0 1012615 10127.0 10140.0 10141.0 10150.5 10151.0 10151.5 10157.5 10158.0 10158.5 10173.5 10185.5 10196.5 10197.0 10210.5 10217.5 10226.5 10228.0 10228,5 10229.0 10229.5 10230.0 10271.5 1027215 10273.5 10274.0 10275.0 10280.5 10286.0 10293.0 10353.5 10356.5 10376.0 10380.0 10391.5 10398.0 10401.0 10414.5 10422.5 10432.0 10440.0 10445.0 10451.0 10455.0 10463.5 10469.0 10472.5 10473.5 10498.0 10499.0 10504.5 10506.0 10507.0 10524.0 10526.5 10527.5 10528.5 10529.0 10530.5 10541.5 10551.0 10561.5 10570.5 10583.5 10585.5 10603.5 10619.0 10626.0 10627.0 10627.5 10628.5 10633.0 10634.5 10635.5 10655.5 10679.5 10680.5 10685.5 10689.5 10690.5 10691.5 10692.0 10692.5 10693.0 10694.0 10699.5 10700.0 10730.5 10761.5 10766.5 10770.5 10771.0 $ REMARKS: 10448.5 10454.5 10457.5 10468.0 10473.5 10477.0 10477.5 10502.5 10503.0 10508.5 10510.0 10510.5 10528.5 10530.5 10532.0 10532.5 10533.5 10535.0 10544.5 10554.5 10564.5 10573.5 10588.5 10589.5 10607.0 10623.0 10629.5 10630.0 10630.5 10631.0 10637.5 10639.0 1063 9.5 10658.0 10682.5 10683.5 10688.0 10693.5 10694.0 10694.5 10695.0 10696.0 10696.5 10697.0 10702.0 10702.5 10733.0 10765.0 10772.0 10774.0 10774.5 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. / ? ?MATCH3A. OUT / ? ?MATCH3B. OUT $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : F-02 : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 I GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 4 42 995 99 1 4 42 995 99 i ' '. '-' 4 42 995 .'.99 1 "-4. 42 '995 / 99 '~'1" '~- .'... 16 * DATA RECORD (TYPE# 0 ) 1006 BYTES * Total Data Records: 42 Tape File Start Depth = 10805.000000 Tape File End Depth = 9770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20712 datums Tape Subfile: 4 Minimum record length: Maximum record length: 284 records... 62 bytes 1006 bytes Tape Subfile 5 is type: LIS · FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 1, 2, 3 2418 1, 2, 3 $ REMARKS: CN WN FN COUN STAT AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL'3 PASSES. : BP EXPLORATION (ALASKA) : F-02 : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv. Crv Size Length Typ Typ.Cls Mod ' 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 38 995. 99 1 4 38 995 99 1 4 38 995 99 4 38 995 99 I 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 42 Tape File Start Depth = 10805.000000 Tape File End Depth = 9770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20712 datums Tape Subfile: 5 65 records... Minimum record length: 62 bytes Maximum-record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE }~JMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9783.0 2418 9897.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10781.0 10795.0 17-DEC-95 FSYS REV. J001 VER. 1.1 1144 17-DEC-95 10817.0 10786' 0' 9800.0 10784.0 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB SBAR SINKER BAR PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA S250EA/8248EA 8220XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): 0.000 10928.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): PROD. FLUIDS/H20 . . . '0'00 0.0 . . 0 0.0 0.000 0.000 0.000 0.0 . . SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): . 0.0 BASE NORMALIZING WINDOW (FT): . -- 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): ' 0 FAR COUNT RATE HIGH SCALE (CPS): 4 00 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : F-02 : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units '~-API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995'99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 147 Tape File Start Depth = 10798.000000 Tape File End Depth = 9774.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 57586 datums Tape Subfile: 6 Minimum record length: Maximum record length: 223 records... 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES · Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9785.0 2418 9799.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10788.0 10802.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SBAR PCM GR CN $ SWIVEL SUB SINKER BAR PCM/CCL GAMMA RAY COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : LOGGER' S CASING DEPTH (FT) : 17-DEC-95 FSYS REV. 1227 17-DEC-95 10817.0 10786.0 . 9800.0 10784.0 1800.0 YES _ , . TOOL NUMBER' ' · 3913NA . 8250EA/8248EA 8220XA · 2418XA 0.000 10928.0 0.0 -'.'- BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID 'RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PROD. FLuIDS/H20 · 0.00 0.0 0.0 · 0 0.0 '0,000' ". 0,000 0,000 0,0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL' SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): ,0 ~ 0 . BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER,. FAR COUNT RATE LOW SCALE (CPS): ..... 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : F-02 : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units 1 GR 2418 68 1 2 CNC 2418 68 1 3 CN 2418 68 1 4 LSN 2418 68 1 5 SSN 2418 68 1 6 CCL 2418 68 1 7 SPD 2418 68 1 8 TEN 2418 68 1 'API API API API Log Crv Crv Size Length. Typ Typ Cls Mod GAPI 4 PU-S 4 PU-L 4 CPS 4 CPS 4 4 F/MN 4 LB 4 4 42 310. 01 4 42 995 99 4 42 890 01 4 42 334 31 4 '.'42 334 30 4' 42 150 01 .4 42- 636 .-99 4' 42 635 99 '1 1 1 1 1 1 1 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 147 Tape File Start Depth = 10805.000000 Tape File End Depth = 9781.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 57586 datums Tape Subfile: 7 Minimum record length: Maximum record length: 223 records... 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9782.5 2418 9796.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SBA/{ PCM GR CN $ SWIVEL SUB SINKER BAR PCM/CCL GAMMA RAY STOP DEPTH 10787.0 10801.0 COMPENSATED NEUTRON 17-DEC-95 FSYS REV. J001 VER. 1.1 1309 17-DEC-95 10817.'0 ..... . 10786.0 9800.0 10784.0 1800.0 ' YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): 0.000 . 10928.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): 0.00 .. _. 0'0 0.0 0 . 0.0 0.000 0.000 0.000 ,.- 0,0 NEUTRON TOOL '- TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0~00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 ' BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): 4 00 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN) : REMARKS: PASS 3. $ 0.0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : F-02 : PRUDHOE BAY : NORTH SLOPE * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units ~ API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 2 CNC 2418 68 3 CN 2418 68 4 LSN 2418 68 5 SSN 2418 68 6 CCL 2418 68 7 SPD 2418 68 8 TEN 2418 68 1 GAPI 4 1 PU-S 4 1 PU-L 4 1 CPS 4 1 CPS 4 1 4 1 F/MN 4 1 LB 4 4 42 310 01 -4 42 995 99 4 42 890 01 4 42 334 31 4 42 334 30 4 42 150 01 4 42 636 99 4 42 635 .'99 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 148 Tape File Start Depth = 10804.000000 Tape File End Depth = 9772.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 94748 datums Tape Subfile: 8 Minimum record length: Maximum record length: 224 records... 62 bytes 1014 bytes Tape Subfile 9 is type: LIS 96/ 1/lO 01 **** REEL TRAILER **** 96/ O1 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 11 JAN 96 8:30a Elapsed execution time = 5.22 seconds. SYSTEM RETURN CODE = 0 LVP 009.M05 VERIFICATION LISTING PAGE i ** REEL HEADER ** SERVICE NAME :SERVIC DATE :82/01/ 4 -' R£E~ ~A~E :REE~ ID CONTINUATION ~ ~01 PREVIOUS RE~L~ : COMMENTS :REEL COMMENTS ** TAPE HEADE~ ~* SERVICE NAME :SER'VIC DATE :82/01/ 4 - ORIGIN :1070 TAPE NAME :62440 CONTINUATION # :01 PREVIOUS TAPE : COMMENTS :TAPE COMMENTS EOF ** FILE HEADER FILE NAME :SERVIC,O01 SERVICE NAME : VERSION ~ DATE : MAXIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE : ** INFORMATION RECORDS MNEM CONTENTS II~I imIimiIi CN : WN FN : RANG: TOWN: SECT: COUN: STAT: CTRY: $~HIO, ALASKA PETROLEUM COMPANY F 2C22'11'I1'i3) PRUDHUE'BAY lin 2' N. SLOPE ALASKA USA CONTENTS PRES: CNLOOIF ** RECORD TYPE 047 ** UNIT TYPE CAT~ SIZE CODE mill ImmI IImi lIII Immi 000 000 03O O65 000 000 016 065 000 000 012 065 000 000 003 065 000 000 003 065 000 000 001 065 000 000 00~ 065 000 000 006 065 000 000 004 065 UNIT TXPE CAT~ SIZE CODE 000 000 007 065 LVP 009,H05 VERIFICATION bISTING RECORD TYPE 047 SS RECORD TYPE 047 ~ COMPANY : 6Ohio ALASKA PETROLEUM CO, HELb : F-2(22-11-11-13) FIELD = PRUDHOE BAY COUNTY : NORTH SbOPE STATE = ALASKA JOB 107U7,62440 CNb RUN #2, 23'DEC'81 - BTM. LOG INTERVAL = 10831 TOP LOG INTERVAL = 9800 TYPE FLUID IN HOLE = CRUDE FLUID bEVEL = 2150 CASING SIZE = 13 375 IN, 2259, TO 0 CASING SIZE = 9~625 IN. 9302, TO 2250 CASING SIZE = ?.00 IN. 8802, TO 0 CASING SIZE =, 7,00 IN. 10928' TO 8802 ************************************************************* PAGE bYP 009,M05 V~RIFICATfON ~ISTING PAGE ** DATA FORMAT RECORD ** ENTRY BbOCK$ TYPE SIZE 4 8 4 9 4 0 DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE UNIT API AP1 ID ORDER # LOG TYPE DEPT - FT 0 0 GA CN5 GAPI 42 31 NPHi CNL PU 42 68 NRAT CNL 42 42 NCNb CNL 42 34 FCNb CNL 42 34 GR CN5 GAPI 42 31 NPHI CNb PU 42 68 NRAT CNb 42 42 NCNb CNL 42 34 FCNb C~L 42 34 GR CNL GAPI 42 31 NPHI CNL PU 42 68 NRAT CN5 42 42 NCNb CN5 42 34 FCNL CN5 42 34 DEPT 1~876,000 GR NCNb ' 999,250 FCN5 NRAT -999,250 NCNb NPHI - 0.022 NRAT DEPT 10800,000 GR NCNb .... 41.850 FCNb NRAT 2,237 NCNb NPMI 17,848 NRAT DEPT 10700.000 GR NCNb '45,712 FCND NRAT 2.205 NCNb NPHI 16,869 NRAT DEPT 10600,000 GR NCNb 41.421 FCNL NRAT ~,225 NCNb NPHI i5.970 NRAT DEPT 10500,000 GR REPR CODE 66 73 65 66 API AP1 FILE CLA~S MOD NO. 0 0 0 32 0 0 2 0 0 1 0 0 92 0 0 93 0 0 32 0 0 2 0 0 I 0 0 92 0 0 93 0 0 32 0 0 2 0 0 1 0 0 92 0 0 93 0 0 32.455 NPHI -999"250 GR -999.250 FCN~ -999.250 NCNI~ 33.759 NPHI 18.821 GR 43.566 FCN'~ 2.289 NCNb 38.966 NPHI 23.549 GR 43.994 FCNL 2.177 NCNb 36.563 NPHi 18,391 GR 46,139 FCN'5 2,165 NCNb 14.034 NPHI $I ENTRY 1 60 0 ZE PROCESS SAMPLE REPR. BEVEL CODE 4 0 1 68 4 0 1 68 4 0 I ~8 4 0 1 ~8 4 0 1 68 4 0 i 68 4 0 1 68 4 0 t 68 4 0 i 68 4 0 I 68 4 0 I 68 4 0 I b8 4 0 1 b8 4 0 I 68 4 0 1 68 4 0 1 68 0,022 NRAT ~.999,250 -999,250 NPHI 999.250 -999,250 GR 30.155 -999,250 FCNI~ 999.250 17.948 NRAT 2,24~ 33,§59 NPHI 17,209 19,680 GR 28,45~ 43.137 FCNL 19.680 13,771 NRAT 1,944 24.147 NPHI 17,289 19,680 GR 23,346 42.708 FCN'L 20.110 19.947 NRAT 2 398 ~6,850 NPHI 16!549 0.970 GR 25 74' 46,997 FCNI~ 21.829 i5.6i0 NRAT 2.052 (+ bVP 009.M~5 YERIFfCATION NCNb NEAT NPHI DEPT NCNb NEAT NPHI DEPT NCNb NEAT NPHI DEPT NCNb NEAT NPHI DEPT NCNb NEAT NPHI DEPT NCNb NEAT NPH! DEPT NCNb NEAT NPHI DEPT 'NCNb NEAT NPHI DEPT NCNb NEAT NPHI 46.997 FCNb 2.056 NCNb 15,830 NEAT . 10400,000 GR 65.439 FCNL 1,968 NCNb 12.79Z NEAT 10300,000 GR '~72,730 FCNb 1.799 NCNb 9.994 NRAI - 10200,000 GR - 54,288 FCNb 2.374 NCNb 19.067 NEAT 10100.000 GR -59'863 FCNb 2,149 NCNb 17,988 NRAT __ lO000.UO0 GR 67.583 FCNb 1,845 NCNb 9'934 NEAT 9900.000 GR 52.143 FCNb 2,22I NCNb 17,109 NEAT 9800.000 GR 38,419 FCNL 3.210 NCNb -999,250 NEAT 9799.000 GR -38,848 FCNL -999,250 NCNb '999,250 NEAT ** FILE TRAILER FILE NAME ;SERVIC.001 SERVICE NAME DATE : MAXIMUM LENGTH : 1024 FiLE TYPE : NEXT FILE NAME LISTING 20.970 45.281 2.155 11.431 32.145 65.010 1.924 11.931 40.741 72,730 1.678 28.653 22.689 54,288 2.303 19,541 26,557 57,719 2,269 99,344 ,585 1,698 2.i77 -999.250 12,804 38,419 -999.250 -999.250 12.804 -999.250-999.250 GR FCNb NCNb NPHI GR FCNb NCNb NPHI GR FCNb NCNb NPHI GR FCNb NCNb NPHI GR FCNb NCNb NPHI GR FCNL NCNb NPHI GR FCNG NCNb NPHI GR FCNb NCNb NPHI OR FCNL NCNb 15.836 21.400 4b.997 14.211 15.636 33.864 65.867 11,213 1i.230 40.311 72.730 20,406 29,554 23,119 54,716 18,b28 20,542 26,987 59,863 10.014 116,867 37,302 62,436 19,247 32'057 24,408 52.572 '999,250 '999,250 '12,804 '999.250 '999.250 '999,250 '999.250 '999,250 NPHI GR FCNb NRAT NPHI G~ FCNb NRAT NPHI GR FCNb NRaT NPMI FCNL NEAT NPHI GR FCNb NRAT NPHi GR FCNb NEAT NPH~ GR FCNb NEAT NPHI GR FCN~ NRA~ NPHI GR FCIIL PAGE 14.791 15.I35 22.259 2,028 13.412 14,535 33,864 1,~01 11'I93 12,732 42,890 2.414 19,427 28.453 23.54g 2.305 16,229 21.444 26.557 12,472 130,284 -37.732 2.358 17 828 37~264 24.408 ~.i8~ -999,~50 -999,250 -999,250 3,027 -999,250 -999.250 -999.250 LVP 009.H05 VERIFICATION LISTING EOF PAGE ** TAPE TRAILER *~ SERVICE NAME :SERVIC DATE :821011 4 ORIGIN :1070 TAPE NAME :62440 CONTINUATION ~ :01 NEXT TAPE NAME : COMMENTS :TAPE COMMENTS ** ~gEb TRAILER SERVICE NAME :MERVIC DATE :82/01/ ORIGIN : REEL NAME :REEL ID CONTINUATION # NEXT REEL NAM~ : COMMENTS :R~Eb COMMENTS . ********** EOF ~ .... 8CHLU~BERGER----~ ~mmmmmmmmmmmmmmmmmmmm~ LIS TAPE VERIFICATION LISTING 5VP 009.H03 VERIFICATION DISTING PAGE 1 ** REEk. HEADER ** SERVICE NAME :EDIT DATE :81/ 8/ 8 ORIGIN : REEL NAME :P.C.A.L. CONTINUATION # :01 PREVIOUS REEL : COMMENTS : LIS FORMAT CUSTOMER TAPE ~ TAPE HEADER SERVICE NAME :EDIT DATE :81/ 8/ 8 ORIGIN : TAPE NAME :62060 CONTINdATION # :01 PREVIOUS TAPE COMMENTS : COMMENTS ~ TAPE COMMENTS TDT RUN # I, LOGGED I-AUG-81-81 CASING DRILLER : 7.00 IN. ~ 10928 FT, CASING LOGGER = 10837 FT. BIT SIZE 8.50 IN. FLUID IN THE HOLE = CRUDE ~, FILE HEADER FILE NAME :EDIT .001 SERVICE NAME VERSION # DATE : MAXIMU~ LENGTH : 1024 · ( ~ LVP 009.H03 VERIFICATION LISTING PAGE FILE TYPE : PREVIOUS FILE : *$ CO~ENTS *$ FILE COMMENTS THIS FILE CONTAINS PASS ONE INFORMATION RECORDS NNEM CONTENTS CN : SOHIO PETROLEUM WN : F-2 FN : PRUDHOE BAY RANG: TOWN: lin SECT: COUN: NORTH SLOPE STAT: ALASKA DENS: 800, ** DATA FORMAT RECORD $$ ENTRY BLOCKS TYPE 0 DATU~ SPECIFIC~TION~BLOCK$ MNEM SERVICE SERVICE UNIT ID ORDER # DEPT FT GR TDTM GAPI SIGH TDTM CU FSIG TDT~ CU TNBK TDT~ CPS TFBK TDT~ CPS TNG TDTM CPS TFG TDTM CPS TRAT TDTM C/C TMOD TDTM SIZE REPR CODE UNIT TYPE CATE SIZE CODE 000 000 015 065 000 000 003 065 000 000 011 065 000 000 003 065 000 000 003 065 000 000 001 065 000 000 011 065 000 000 006 065 000 000 004 065 ENTRY 0 API API API API FILE LOG TYPE CLASS MOD NO' 0 0 0 51 3I 32 5i 40 1 51 4O 2 51 39 99 51 39 99 51 39 99 5t ~9 99 5~ 42 0 51 43 0 SIZE 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 PROCESS SAMPLE bEVEL 0 0 0 0 0 0 0 0 EPR ODE 68 68 68 68 68 68 68 DATA ** DEPT 10860,000 GR TNBK 52,594 TFBK TRAT 844.000 TMOD DEPT 1080~,000 GE TNBK 13 ,125 TFBK TRAT 2,549 TMOD DEPT 10700.000 GR 32,344 13,5~5 387,250 2B 9 1.000 SIGM TNG $IGM TNG $IGM 4,188 387.250 20,938 539,000 19.$75 FSIG TFG F$IG l 1 742 2~5.375 17,750 ~LVP 009.H03 VERIFICATION bISTING TNEK 206,375 TFBK TRAT 2.850 TMOD 36,750 TNG 1.731 DEPT 10600,000 GR TNBK 270,250 TFBK TRAT 2.906 TMOD 19.172 SIGM 48.312 TNG i.731 DEPT 10500.000 GE TNBK 320 250 TFBK TRAT 2:404 TMOD 14.328 SIGM 55,906 TNG 1.731 DEPT 10400.000 GR TNBK 365,000 TFBK TRAT 2.441 TMOD 13.406 SIGM 70.438 TNG 1.731 DEPT 10300.000 GR TNBK 415.750 TFBK TRAT 2.146 TMOD 18,375 SIGM 91.063 TNG 1.731 DEPT 10200.000 GR TNBK 452.250 TFBK TRAT 3.287 TMOD 53.156 SIG~ 94:71881 31 TNG DEPT 10100.000 GR TNBK 481.000 TFBK TRAT 4,070 TMOD 60.344 97.938 TNG 1.000 DEPT 10000.000 GR TNBK 516,000 TFBK TRAT 2.043 TMOD 75.188 SIGM 126,~121. 31 TNG ..oo.ooo TNBK 54 500 TFBK TMOD 873 40.156 SIGM 132,375 TNG 1'731 DEPT 9800,000 GR TNBK 547,500 TFBK TRAT 5,418 TMOD 84.938 SIGM 111,~00 TNG 1. 00 DEPT 9740,000 GR TNBK -999,250 TFBK TRAT -999,250 TMOD -99g.250 SIGM -99g,250 TNG -999.250 ** FILE TRAILER FILE NAME :EDIT .001 SERVICE NAME VERSION # DATE : NAXIMUM LENGTH : 1024 FILE TYPE NEXT FILE NAME EOF ******~*** 596.500 TFG 19.609 FSIG 540.000 TFG 15.164 FSIG 482.500 Tf'G 16.797 FSIG 737,000 TFG 15.023 FSIG 613.000 TFG 21.781 FBIG 652.000 TFG 26.453 F$IG 899,500 TFG 16,422 FSIG 531.000 TFG 22.031 F$IG 810.500 TFG 36.875 FBIG 1013,500 TFG '999.250 FS:IG -999.250 TFG PAGE 271.500 16.938 231.500 13.031 289.000 14 727 377:500 12.898 351.250 18.813 292.500 22 797 13 883 294:750 19 734 , :ooo 38,1:56 274,000 -999.250 -999.250 ~LVP 009.H03 VERIFICATION LISTING PAGE ** FILE HEADER FILE NAME :EDIT .002 SERVICE NAME VERSION # DATE I MAXIMUM LENGTH : 1024 FILE TYPE PREVIOUS FILE : ~, COMMENTS ** FILE COMMENTS THIS FILE CONTAINS PASS TWO AND PASS THREE. ** INFORI4ATION RECORDS MNEM CONTENTS UNIT TYPE CATE SIZE CODE CN : SOHIO PETROLEUM WN : F-2 FN : PRUDHOE BAY RANG: 13E TOWN: lin SECT: 2 COUN: NORTH SLOPE STAT: ALASKA DENS: 800. 000 000 015 065 000 000 00~ 065 000 000 011 065 000 000 00~ 065 000 000 003 065 000 000 001 065 000 000 011 065 000 000 006 065 000 000 004 065 ** DATA FORMAT RECORD ** ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 0 I 66 0 DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE UNIT APl AP1 AP1 AP1 FILE SIZE PROCESS SAMPLE REPR ID ORDER ~ LOG TYPE CLASS MOD NO. bEVEL CODE FT 0 0 0 0 0 4 0 I 68 DEFT GR TDTM SIGM TDTM FSIG TDTM TNBK TDTN TFBK TDTM TNG TDTN TFG TDTM TRAT TDTM MOD TDTM R TDTM SIGH TOTS FS1G TDT~ TNBK TDTM TFBK TDTM TNG TDTM GAPI 51 31 32 0 0 4 0 CU 51 40 1 0 0 4 0 CU 51 40 2 0 0 4 0 CPS 51 39 99 0 0 4 0 CPS 51 39 99 0 0 4 0 CPS 51 39 99 0 0 4 0 CPS 51 39 99 0 0 4 0 C/C 51 42 0 0 0 4 0 51 43 0 0 0 4 O GAPI 51 3~ 32 0 0 4 0 CU 51 40 1 0 0 4 0 CU 51 40 2 0 0 4 0 CPS 51 39 99 0 0 4 o CPS 51 39 99 0 0 4 0 CPS 5! 39 99 0 0 4 0 i 68 ! 68 I 68 1 68 1 68 I 68 'bVP TFG TRAT TMOD 009.H03 TDTM TDTM TDTM VERIFICATION CPS C/C DATA DEPT TNBK TRAT FSIG DEPT TNBK TRAT F$IG TFG DEPT TRAT F$IG TFG DEPT TNBK TRAT FSIG TFG DEPT TNBK TRAT FSIG TFG DEPT TNBK TRAT FSiG TFG DEPT TNBK TRAT FSIG TFG DEPT TNBK TRAT F$IG TFG 10860.000 GR 561.000 TFBK 5.406 TMOD 66.000 TNSK 68,875 TRAT 10800.000 GR 457.750 TFBK 2.545 TMOD 953 TNBK .:ooo 29 R T 10700.000 GR 483.000 TFBK 2,834 TMOD !8.328 TNBK 267.750 TRAT 10600,000 GR 499.000 TFBK 17: 328 TNBK 251.375 TRAT i0500,000 GR 519,000 TFBK 2,406 TMOD 13.141 TNBK 281.250 TRAT 10400.000 GR 560,500 TFBK 2'518 TMOD 14.367 TNBK 332.250 TRAT 10300,000 GR 542.000 TFBK 2 184 TMOD 13:242 TNBK 344.750 TRAT 10200.000 GR 554.000 TFBK 3,547 YMOD 20,109 TNBK 236.125 TRAT LISTING 51 39 99 0 0 51 42 0 0 0 51 43 0 0 0 682.000 $IGM 117.375 TNG 91.750 GR 462.000 TFBK 5.566 TMOD 50.594 SIGM 91.063 TNG 1.731 GR 534.500 TFBK 2.492 TMOD 35.063 SIGM 88.375 TNG 1.731 OR 544 500 TFBK 41.063 SIGM 88.438 TNG 1.731 GR 55~:000 TFBK 916 TMOD 32.719 SIGM 93.125 TNG i ' 731 GR 561.000 TFBK 2. 396 TMOD 42.844 $IGM 173,125 TNG 1.731 GR 603.000 TFBK 2.352 TMOD 43.188 SIGM 115.000 TNG 1.731 GR 590,000 TFBK 2,180 T~OD 68.625 SIGM 115,525 TNG 1 '.731 OR s ]: oo 97 T~OD 4 0 1 4 0 4 0 1 40.688 F$IG 964.500 TFG -441.250 SIGM 87.312 TNG 68.875 21.547 FSIG 619.500 TFG 67,813 $IGM 101.813 TNG 1.731 20.031 F$IG 610,000 TFG 51.094 SIGM 104.750 TNG 1,731 19.859 FSIG 5724.500 TFG 5 .875 $IGM 101,250 T[,~G 14.906 F$IG 496,250 TFG 37'9388IGM 107.938 TNG 1.731 16.578 FSIG 571.000 TFG 50.281 $IGM i82.125 TNG 1,731 15.102 F$IG 598,000 TF(i 54'875 TNG 22.109 F$IG 654,000 TFG 88;375 $IGM TNG PAGE 68 68 68 44.469 279.000 118.250 68.875 18.609 000 Io :ooo 572.000 18.328 276.000 19.578 610.500 17.375 260,500 19.531 550.000 i2 984 250 070 499 000 I4 266 313 000 1:6 594 658 000 12,867 331,250 14,898 620.500 I: 8.781 274.000 23' 063 824,000 '~LVP 009.H03 VERIFICATION LISTING DEPT 10100.000 GR TNBK 578,500 TFBK TRAT 3,949 TMOD FSIG 23,625 TNBK TFG 193,750 TRAT 75 113 ! 606 4 DEPT 10000,000 GR TNBK 583,000 TFBK TRAT 2,084 TMOD F$IG 14,188 TNBK TFG 335,250 TRAT 93 139 623 2 DEPT 9900.000 GR TNBK 598,000 TFBK TRAT 2,883 TMOD FSIG 19,969 TNBK TFG 373,500 TRAT 146 1 601 2 DEPT 9800.000 GR TNBK 587,500 TFBK TRAT 5,344 TMOD FSIG 38.625 TNBK TFG 281,500 TRAT 106 122 1 602 5 DEPT 9740,000 GR TNBK '9992250 TFBK TRAT -999,250 TMOD FSIG '999 250 TNBK TFG '999:250 TRAT '999 '999 '999 '999 -999 *~ FILE TRAILER ** FILE NAME :EDIT ,002 SERVICE NAME : VERSlON# : DATE ~ MAXIMUM LENGTH : 1024 FILE TYPE : NEXT FILE NAME : EOF ** FILE HEADER ** FILE NAME :EDIT SERVICE NAME : VERSION # : DATE : MAXIMUM LENGTH : FILE TYPE : PREVIOUS FILE z ** COMMENTS ** FILE COMMENTS .003 1024 .625 SIGH .250 TNG ,000 GR ,500 TFBK .402 TMOD .063 SIGH .750 TNG .731 GR .000 TFBK .098 TMOD ,781 SIGH .125 TNG .731 GR .000 TFBK .828 TMOD .375 SIGH .312 TNG .000 GR .000 TFBK .113 TMOD :250 SIGN 250 TNG .250 GR ,250 TFBK ,250 TMOD 25.641 985.500 100.938 121.688 1.000 16.93~ 613.000 118.625 155.625 1.731 22.016 860.000 75.750 137.625 1.731 36.750 966.000 120.438 125.563 1.000 -999,250 -999,250 -999,250 -999,250 -999,250 FSIG TFG SIGH TNG FSIG TFG SlG~ TNG FSIG TFG SIGH TNG FSIG TFG TNG FSlG TFG TNG PAGE 22,516 39.250 227.078 917.500 14.469 266.500 16 438 5861500 1 969 22 047 873 000 38,625 258,250 35"969 985.500 ~999,250 999.250 999:250 '~LVP 009.H03 VERIFICATION LISTING THIS FILE CONTAINS PASS FOUR AND *~ iNFORMATION RECORDS $* PALS FIVE. PAGE MNEM CONTENTS CN : SOHIO PETROLEUM WN : F-2 FN : PRUDHOE BAY RANG: 13E TOWN: i1~ SECT: 2 COUN: NORTH SLOPE STAT: ALASKA DENS: 800. $, DATA FORMAT RECORD *~ ENTRY BLOCKS TYPE 0 DATUM SPECIFICATION MNEM SERVICE SERVICE ID ORDER ~ DEPT GR TDTM SIGM TDTM F$IG TDTM TNBK TDT~ TFBK TDTM TNG TDTM TFG TDTM TRAT TDT~ TMOD TDT~ GR TDTM SIGN TDT~ FSIG TDTM TNBK TDTN TFBK TDTM TNG TDTN TFG TDT~ TRAT TDTM TNOD TDTM SIZE ! REPR CODE 66 BLOCKS UNIT AP! AP1 AP1 LOG TYPE CLASS FT 0 0 0 GAPI 51 31 32 CU 51 4O CU 51 40 2 CPS 5 1 39 99 CPS 5~ 39 99 CPS 5X 39 99 CPS 51 39 99 C/C 51 42 0 51 43 0 GAPI 51 31 32 CU 51 40 CU 51 40 2 APl FEtE SIZE MOD NO. 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 0 0 4 O 0 4 0 0 4 0 0 4 0 0 4 4 4 4 4 0 4 0 4 CPS 51 39 99 0 0 CPS 51 39 99 0 0 CPS 51 39 99 0 0 CPS 51 39 99 o 0 C/C 51 42 0 0 51 43 0 0 DATA DEPT TNBK TRAT FSIG TFG 10860,000 GR 467,500 TFBK 35.125 ~MOD -2 i82 TNBK 469:500 TRAT -135,250 SIG~{ 92,813 TNG -662,000 GR 470,750 TFBK 102~,000 TNOD UNIT TYPE CATE SIZE CODE 000 000 015 065 000 000 003 065 000 000 011 065 000 000 003 065 000 000 003 065 000 000 001 065 000 000 011 065 000 000 006 065 000 000 004 065 ENTRY 0 PROCESS SA~4PLE REPR LEVEL CODE 0 I 68 0 i 68 0 0 0 0 0 0 0 68 0 68 o 68 0 68 o 0 0 1 68 0 I 68: 0 1 68 4- 44 ! FS iG '2 '-182 · 469 · 5:00 DEPT TNBK TRAT F$IG TFG DEPT TNBK TRAT FSIG TFG DEPT TNBK TRAT F$IG TFG DEPT TNBK TRAT F$IG TFG DEPT TNBK TRAT FSIG TFG DEPT TNBK TRAT FSIG TFG DEPT TNBK TRAT F$IG TFG DEPT TNBK TRAT F$IG TFG DEPT TNBK TRAT FSIG TFG DEPT 009.H03 VERIFICATION 10800.000 GR 550.500 TFBK 2.746 TMOD 19 969 TNBK 296:250 TRAT 10700.000 GR 547.500 TFBK 2.8tl TMOD 18.219 TNBK 282.500 TRAT 10600.000 GR 558 000 TFBK 3".020 TMOD 17,063 TNBK 272,750 TRAT i0500.000 GR 576,500 TFBK 2.363 TMOD 12,969 TNBK 268.000 TRAT 10400.000 GR 612,500 TFBK 2,369 TMOD 14,188 TNBK 324.250 TRAT 10300.000 GR 598,000 TFBK 2.225 TMOD 348 TRAT 10200,000 GR 605,500 TFBK 3,348 TMOD i8,766 TNBK 280,000 TRAT i0100.000 GR 614,000 TFBK 3.717 TMOD 22,156 TNBK 190.625 TRAT 10000,000 GR 640.500 TFBK 2.270 TMOD 13.875 TNBK 278.750 TRAT 9900.000 GR LISTING 80.25(} SlGM 107.688 TNG 1.000 GR 569.000 TFBK 2.455 TMOD 61.219 $IGM 102.750 TNG 1.731 GR 580.500 TFBK 2.834 TMOD 62.125 SIGM 103.312 TNG 1.731 GR 589.500 TFBK 2.949 TMOD 45.063 SIGM 104.938 TNG 1.731 GR 587.000 TFBK 2.373 TMOD 59.063 SIGM 188.125 TNG 1.731 GR 638.500 TFBK 2.414 TMOD 64,250 8IGM 131.500 TNG 1,731 GR 622'500 TFBK 2.113 TMOD 95.000 SlGM 131.625 TNG 1.731 GR 638,000 TFBK 3.375 TMOD 105.625 SIGM i28,750 TNG 1.000 GR 639.000 TFBK 4.270 TMOD 124.250 SIaM 162.250 TN 1.731 GR 656.000 TFBK 2.186 TMOD 84.125 21.734 FSIG 664'500 TFG 83.625 SIGM 107.625 TNG 1.731 19,828 F$IG 630.500 TFG 72.875 $IGM 109.750 TNG 1.731 19.500 FSIG 569.000 TFG 70.688 SIGM i08.625 TNG 1.731 15.203 FSIG 501.500 TFG 58.344 SIGM 109,250 TNG 1.731 16,109 F$IG 510.250 TFG 76.8755 $IGM 201.87 TNG 1.73i 1.731 GM 1.731 29,969 F$IG 946 '500 TFG 95.875 SIGM 140.000 TNG 1.000 i6..56_3. 594. 000 TFG 1.731 21.828 FSiG PAGE 19.969 263.500 20.766 604.000 18.219 257.750 19.922 630.500 17,063 271,250 19.844 552,.500 12.969 265.500 14 9~4 o?: oo 14.188 351,500 16.484 663.000 12.531 368,000 14,922 646.500 22.156 73. '125 12 .438 9773.500 ,875 16.172 521.500 19.641 LVP 009.H03 VERIFICATION LISTING TNBK 638.500 TFOK TRAT 2,816 TMOD FSIG 19,641 TNBK TFG 351.250 TRAT 157.375 TNG 1.73! GR 652.000 TFBK 2.877 TMOD DEPT 9800.000 GR TNBK 635.000 TFBK TRAT 5.383 TMOD FSIG 38.188 TNBK TFG 281.000 TRAT 131.375 SIGM 135.625 TNG 1.000 GR 641.000 TFBK 5.285 TMOD DEPT ~740,000 GR TNBK 999.250 TFBK TRAT -999.250 TMOD FSIG -999,250 TNBK TFG -999.250 TRAT '999.250 SIG~ -999.250 TNG '999.250 GR '999.250 TFBK -999.250 TMOD ** FILE TRAILER FILE NAME :EDIT .003 SERVICE NAME : VERSION ~ DATE : MAXIMUM LENGTH : 1024 FILE TYPE NEXT FILE NAME ** TAPE TRAILER SERVICE NAME :EDIT DATE :81/ 8/ 8 ORIGIN : TAPE NAME :62060 CONTINUATION # :01 NEXT TAPE NAME : COMMENTS : ** REEL TRAILER ** SERVICE NAME :EDIT DATE :81/ 8/ 8 ORIGIN : NEXT ~EEL NAME : CUSTOMER TAPE EOF 818,500 89.563 154.000 1.731 37.094 968.000 142.125 140.250 1.000 -999.250 -999.250 -999.250 -999.250 -999.250 TFG SlGR TNG FSIG TFG SlGM TNG FSIG TFG SIGM TNG PAGE 375.500 21.781 770.000 38.188 262.500 36.656 989,500 -999.250 -999.250 -999.250 -999.250 11 000000 77'77777777 000000 7177777777' 11 000000 7777777777 000000 7777777777 1111 00 O0 77 O0 O0 77 1111 O0 00 77 00 O0 77 11 O0 0000 77 O0 0000 77 11 O0 0000 77 O0 0000 77 11 O0 O0 O0 77 O0 O0 O0 77 11 O0 O0 O0 77 O0 O0 O0 7'1 11 0000 O0 77 0000 O0 17 11 0000 O0 77 0000 O0 77 11 O0 O0 77 O0 O0 77 ii O0 O0 77 O0 O0 77 111111 000000 77 000000 77 111111 000000 77 000000 77 666666 000000 5555555555 77777'77777 5555555555 666666 000000 5555555555 7777777777 5555555555 66 O0 O0 55 77 55 66 O0 O0 55 77 55 66 O0 0000 555555 77 555555 66 O0 0000 555555 77 555555 66666066 O0 O0 O0 55 77 55 66666666 O0 O0 O0 55 77 55 66 66 0000 O0 55 77 55 66 66 0000 O0 55 77 55 66 66 O0 O0 55 55 77 55 55 66 66 O0 O0 55 55 77 55 55 666666 000000 555555 77 555555 6~6666 000000 555555 77 555555 CCCC -~ N CCCC PPPP RRRR O U DDDD H H OOO EEEEE C MN MN C P P R R U U D D H H O O E C M MN C P P R R U U D D PI H 0 0 E C M ~ C ..... PPPP RRRR U U D D H~iHHt~ 0 0 EEEE C ~4 M C P R R O U D D H H 0 O E C M M C P R R 13 O D D H H O 0 ~ CCCC M M CCCC P R R UUUUU DDDD H H OOO EEEEE *START*: USER PCAL [10701,60575] JOB SHIP SEQ. t710 DATE 28-AUG-80 19:04:45 MONITOR SWS KLlOE37 APR-80~ *START* *START* USER PCAL [I0707,60575J, dOB SHIP SE(~. 3710 DATE 28-AUG-80 19:04:45 MONITOR 9¥ ¥~ EEEEEEEEEE R~RRRRR~ ~¥ ¥¥ EEEEEEEEEE RRRRRRRR VV VV EE R~ RR VV VV EE RR RR VV VV EE R~ RR VV VV EE RD RR VV VV EEEEEEEE RRRRRRRR VV VV EEEEEEEE RRRRRRRR VV VV EE RR RR VV VV EE RD RR VV VV EE RD ~ VV VV EE RD RR VV EEEEEEEEEE R~ RR VV EEEEEEEEEE RR RR IIIiii Iillii 1I II Ii II II II I1 II II II IIIIII lIIIII Fl;'p'l; FFt~ FFF FFl; P Fl; [; ["' FP Fl;" fi" FF FF~FFF[~· IF FF YY YY YY YY YY YY Y~ YY YY YY YY 000000 000000 5555555555 000000 000000 5555555555 O0 O0 O0 O0 55 O0 O0 O0 O0 55 O0 0000 O0 0000 555555 O0 0000 O0 0000 555555 O0 O0 O0 O0 O0 O0 55 O0 O0 O0 O0 O0 O0 55 0000 O0 0000 O0 55 0000 O0 0000 O0 55 O0 O0 O0 O0 55 55 O0 O0 O0 O0 55 55 000000 000000 555555 000000 000000 555555 *START* USER PCAL [10707,60575] dOB SHIP MONITOR SWS KLlOE37 APR-80~ *START* FILE: DS~H:VERIFX.O05<057>[10707,60575] CR~ATED~ PBINTED: 2B-AUG-B0 19:04:59 QUEUE SWITCHES: /FILE:FORT /COP. IES:I /SPACING:I /LIMIT:59 /FORMS:NORMAL .]710 DATE 28-AUG-80 2B-AUG-B0 19:03:05 1g:o4:45 SCHLUMBERGER COMPUTING 10707,60575 REEL HEADER LENGIH: 132 BYTES REEL NAME: P.C.A.L. SERVICE NAME: EDIT' REEL CONTINUATION NUMBER: 01 PREVIOUS REEL NAME: COMMENTS: LiS FORMAT CUSTOMER TAPE DATE: 80/ 8/28 ~APE HEADER LENGTH: 132 BYTES TAPE NAME: 60575 OATE: 80/ 8/28 SERVICE NAME: EDIT TAPE CONTINUATION NUMBER: O! PREVIOUS TAPE NAME: COMMENTS: UNIQUE WELL IDENTIFICATION NUMBER IS 50-029-20084 TAPE COMMENTS DATE LOGGED 5-jUN-80/RUN ONE/TYPE FLUID CRUDE/FLUID LEVEL 2130 FT/ CASING & TUBING RECU~D 13.375 68# 2250-0/9.625 47# 9302-2250/ 7 26# 8802-0/7 29# 10928-8802/ EOF ~ILE HEADER LENGIH: 62 BYTES FILE NAME: EDIT .001 MAXIMUM PHYSICA~ RECORD LENGTH: PREVIOUS FILE NAME: 1024 BYIES WELL SiTE INFORMATION RECORD LENGTH: COMPANY: WELL: FIELD: RANGE: TOWN: SECTION: COUNTY: STATE: 176 BYTES SOHIO ALAS~.A PETRO. CO. F-2 PRUDKOE 13E I1N 2 DATA ?'ORMAI' SPECIFICATION LENGIH: 650 BYTES ENTR~ BLOCKS: 0 SiZE REP CODE ENTRi 1 66 0 DAqI:13M SPECIFICATION BbOCK6: ENTRY lC I'.OOL SVORD# UNIIS APl API AP1 API FILE# SIZE EXP PROC SAM REP DEPT SHI~-T 1 DEPT 2 GR CNL ] NPHi CNL 4 NRAT CNL 5 NCNL CNL b ~CNL CNL 7 GR CNL 8 NPHI CNL 9 NRAT CNL 10 NCNL CNL 11 ~ CNL CNL ! 2 GR CNI, 1 { NPHI CNL 1 4 NRAT CNL 15 NCNL CNL ! 6 FCNL CNL FT 0 0 0 0 0 4 0 0 ! 68 0 0 GAP1 42 31 52 0 0 4 0 0 1 68 0 0 PU 42 68 3 0 0 4 0 0 1 68 0 0 C/C 42 42 1 0 0 4 0 0 1 68 0 0 CPS 42 34 92 0 0 4 0 0 1 68 0 0 CPS 42 ~4 93 0 0 4 0 0 1 68 0 0 GAPI 42 31 ]2 0 O 4 0 0 I 68 0 0 PU 42 68 3 0 0 4 0 0 1 68 0 0 C/C 42 42 1 0 0 4 0 0 1 68 0 0 CPS 42 34 92 0 0 4 0 0 1 68 0 0 CPS 42 ]4 93 0 0 4 0 0 1 68 0 0 GAPI 42 31 32 0 0 4 0 0 J~ 68 0 0 PU 42 68 ] 0 0 4 0 0 1 68 0 0 C/C 42 42 1 0 0 4 0 0 1 68 0 0 CPS 42 ]~ 92 0 0 4 0 0 1 68 0 0 CPS 42 34 93 0 0 4 0 0 1 68 0 0 DEPTH 10862.000 10800.000 10700,000 10600,000 10500.000 10400.000 103O0,000 10200.000 I0100.000 100OO.OOO 9qo0. 000 M NEMON IC G~ ~'CNL NCNb NRAT GR ~'CNL NCNb NRAT GR ~CNL NCNL NRAT FCNL NCNL NRAT GR FCNL NCNb NRAT GR ~CNL NCNb NRAT GR fCNL NCNb NRAT GR FCNb NCNb NRAT GR FCNL NCNb NRAT GR FCNL NCNb NRAT GR FCNL NCNb NRAT VALUE 40.500 25.740 56.628 2.168 41,100 22,3O8 50,193 2,276 25,300 22.737 51,051 2.282 24.500 25,311 54,912 2,240 13,700 23,595 51.480 2,200 12,800 33.462 68,640 2.024 12,900 42.042 76.362 1.757 31.600 24 882 2.313 22.400 27,456 62.205 2,325 71,500 40.32b 78.078 2,092 32,400 24.882 56.199 2.303 MNEMUNIC NPHI FCNL NCNL NPHI GR fCNL NCNb NPH1 GR f"CNL NCNL NPH! GR FCNL NCNb NPHI GR fC.NL NCNb NPHI GR FCNL NCNb NPHI GR F"CN.L NCNb NPHI GR FCNL NCNb NPHI GR FCNL NCNb NPHI GR f~CNL NPHI GR f'CNL NCNb VALUE 17,560 39,600 26.169 56,628 20,520 39.400 21,879 51.480 18.620 26,900 22.308 51.q09 18,420 25,700 24,882 54,912 18.240 15.700 23,595 51.909 14,940 14,100 {3,033 68,640 12,080 13.800 42,471 75.933 21,660 30 3OO 24:882 58.3,44 21.060 24,200 27.456 63.492 13.3b0 73 700 ~9~468 75,933 19.~80 33. O0 24~882 56 628 MNEMONIC NPHI GR fCNL NRAI NPHI FCNL NRAT NPHi ~'CNL NRAT NPHi GR fCNL NRAT NPHI GR ~'CNL NRAT NPHI GR PCNL NRAT NPMi fCNL NRAT NPHI GR f'~CNL NRAT NPHi GR ~CNL NPHI GR f~CNL NPHi GR FCNb VAbUE 2.144 18,320 76.100 25,740 2,325 20,920 39,500 22,]08 2,224 19.800 2b,500 22,308 2,218 18,580 26,700 24,882 2.186 18.140 14.800 24.024 1.969 15.660 15.600 34.320 1.791 12.440 16.300 43.329 2.383 1,280 2.000 25.311 2.369 20.420 23.000 27.456 1.881 14,900 80.800 37.752 2.287 20.260 35,600 24.882 MNEMONIC NCNb NRAT NPHI NCNb NPHI NCNb NRAI NPHI NCNb NRAT NPHI NCNb NRAT .NPHi NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPHI NCNb NRAT NPH1 VAbUE 54,912 2,160 17.860 51.051 2,347 19,860 50.193 2.282 19,b40 54.912 2.242 19.060 51.909 2.170 18,260 07.782 2.032 15.520 75.075 1,817 11.5b0 57.915 2.339 21.000 b2.634 2.321 20.300 '75.933 2,052 16.280 55,770 2.307 20.b20 DEPTH 9800.000 NNENONIC GR FCNL NCNL NRAT VALUE -999.250 -999.250 41.613 0.000 MNkMONiC VAhUE NPHi -99925.000 GR 75.200 FCNL 13.728 NCNL 0.000 MNEMONIC NPH1 GR VALUE -999.250 37.500 0.000 0.000 MNEMONIC NCNL NRA~i NPH1 VALUk -999,250 ].170 -5.000 SUMMARY OF DATA RECORDS NUMBER OF RECORDS: 142 LENGTH OF RECORDS: 966 BYTES LENGTH OF LAST RECORD: 646 FILE TRAILER LENGTH: 62 BYTES FILE NAME: EDIT .001 MAXIMUM PHYSICAL RECORD LENGTH: NEXT FILE NAME: 1024 BYTES EOF TAPE TRA ILE}~ LENGTh: 132 BYTES TAPE NAME: 60575 DATE: SERVICE NAME: EDIT TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COMM~N~: UNIQUE WELL IDENTIFICATION NUMBER IS 801 8/28 50-029-20084