Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout175-006
11. Type of Request:
/ 76=-00 to
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
Operational shutdown U
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Abandon U
Alter casing D
Change approved program D
2. Operator Name:
Union Oil Company of California
3. Address:
PO Box 196247, Anchorage, AK 99519
7. KB Elevation (ft):
118'
8. Property Designation:
East Lewis River
11.
Total Depth MD (ft):
9,480'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
2,804' to 5,762'
Packers and SSSV Type:
Total Depth TVD (ft):
9,480'
Length
48'
363'
1,368'
Suspend U
Repair well D
Pull Tubing D
Development
Stratigraphic
0
D
PerforateL::J Waiver U Annular Dispos. U
Stimulate D Time Extension D Other D
Re-enter Suspended Well D
5. Permit to Drill Number:
Exploratory D
D
Service
I Number:
RECEIVED
PCT 1 5 2004
' Ty4Ð1'~ ail <168$ ConS'1IfrM¡-.,red):
. Plugs (mea~r8ge 855'
D (ft). 5,
5,900
9. Well Name and Number:
LRU-1A
10. Field/Pools(s):
Effective Depth MD (ft): Effective Depth
2,790' 2,790'
Size MD
30" 48'
20" 363'
13-3/8" '\ 1,368'
.~
Perforation Depth TVD 11.) \ L\t
2,804' to 5,762' 2.È7!J"12.3~"
Otis VST RetrievabJÅ~cker (4; \ ~
\Q \ \.¡
TVD Burst Collapse
48'
363' 1,530 psi 520 psi
1,368' 2,730 psi 1,130 psi
Tubing Grade: Tubing MD (ft):
N-80; N-80 4,686.7'; 5,760'
Packers and SSSV MD (ft): 2,111.7'; 3,896.9', 4,690.6'; 5,484.5'
/ 13. Well Class after proposed work:
Exploratory D Development 0 Service D
15. Well Status after proposed work:
/2004 Oil D Gas 0 Plugged D
WAG D GINJ D WINJ D
12. Attachments: Description Summary of Proposa
Detailed Operations Program D
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregOin. g is tru. :¡a. nd cor¡ ect to the best of my knowledge.
Printed Name Tim C. Brandenburg Title Drilling Manager
Signature ."7'" C' d -- ~ Phone 907-276-7600 Date
COMMISSION USE ONLY
Conditions of approval:
Plug Integrity D
Other:
Subsequent Form Required:
Approved by:
so that a representative may witness
Mechanical Integrity Test
D
Location Clearance
D
COMMISSIONER
Form 10-403 Revised 1212003 ~hb INS~S ~N RE:'RSE
Abandoned
WDSPL
D
D
Contact
Steve Tyler 263-7649
10/15/2004
Sundry Number:
30 tf- 3€"L(
SC/\NNED OCT 2 7 2004.
BY ORDER OF
THE COMMISSION
Date:
0 RIG I N A l:ubm~ in Duplicate
LRU I-A Work Summary
Perforate Lower Beluga Sands
. MIRV Slickline. Tag fill. RIH wi dummy gun. RD Slickline.
. MIRV Eline. RIH wi 2-1/8"guns (Power Spiral, 6spf).
. Perf Lower Beluga sands (GR log to determine DIL perf depth).
(perf) 3850' to 3856'
(perf) 3800' to 3828'
Test
(perf)
(reopen previously squeezed perfs)
4574' to 4580'
3715' to 3722'
3084' to 3091'
2882' to 2888'
2802' to 2819'
(perf)
(reopen previously squeezed perfs)
(reopen previously squeezed perfs)
RD Eline.
. Turn well over to production.
SCANNED OCT 2 7 2004
Sr 5 5 75
CG, ,eted: 10/1(75
Lost' Work Over: /4/90
Lew s Rver
Lewis River Fh..,u
API No.: 50-283-20047-00
Top of Beluga: 2279 Ft. MD.
Top of T yonek: 5864 Ft. MD.
Top of Ft.
~
c::J
0
'"
I'-
0.0 - 48.0' 30" 00 104.00# /ft LP CSG Driven -I
0.0 - 363.0' 20" 00 94.00# /ft H-40 CSG
363.0 - 363.0' SHOE L
0.0 -- 1368.0' 13 3/8" 00 54.50# /ft K -55 SURF CSG
1368.0 - 1368.0' SHOE L
1F
2790.0 - 2792.0' SQUEEZE PERFS Sqz'd 8/11/75, ISOLATION ~
2804.0 - 2812.0' SQUEEZE PERFS Sqid 8/12/75, DST
3084.0 - 3094.01 SQUEEZE PERFS Sqid 8/8/75. DST
3647.0 - 3651.0' ABANDONED PERFS Sqid 8/4/75, DST
3717.0 -- 3725.0' SQUEEZE PERFS Sqid 8/4/75. DST
4730.0 - 4738.0' SQUEEZE PERFS Sqz'd 12/27/89
4661.0 - 4676.0' FILL 2/7/97
5014.0 - 5036.0' SQUEEZE PERFS Sqz'd 12/27/89
5855.0 - 5900.0' FlSH JUNK
5900.0 - 5901.0' BRIDGE PLUG
-
---
.
~'t.'; " : :
I
: : : : ~: : : : : : ~
: ~ : ~~ : ~ : ~ : ~
IÎP1~L1i
... ,
KG ELEV: 118'
PBTD: 5900'
TO: 948œ
\... A.
L 14.5 - 46861 2.87511 00 6.40#/ft N-80 TBG LONG STRING
14.5 - 15.J HANGER McEvoy Hgr.
'-N
I-
e..,)
0
Q
LU
Z
Z
(3
(j)
~
14.5 - 1955.91 1.250" 00 3.02#/ft CS Hydril TBG Heater String
14.5 - 15.31 HANGER
2109.3 - 2110.3' MULESHOE
.~
2097.9 - 2111.7' RETRY. PACKER Otis VST #4 Pkr.
3883.0 - 3896.91 RETRV. PACKER Otis VST #3 Pkr.
3948.0 - 3958.0' PERFS MB, 8HPF, 10\ 8/27/75, 12/28/89 4278.0 - 4287.0
4096.0 - 4116.0' PERFS MBI 8HPF, 20', 8/1/75, 12/28/89 4ðð87GO_--4ðt6~O'1
4202.0 - 4210.0' PERFS MBI 8HPFI 8', 8/27/75, 12/28/89 . .
4360.0 - 4369.0' PERFS MB, 8HPF, 9\ 8/27/75, 12/28/89
4661.0 - 5760.0' Fill 2/7/97
4676.1 - 4690.6' RETRV. PACKER Otis VST 12 Pkr.
4686.7 - 5760.0' 2.375" 00 4.60#/ft N-80 TBG LONG STRING
5470.0 - 5484.5' RETRV. PACKER Otis VST 11 Pkr.
5528.0 - 5535.01 PERFS UT, 4HPF, T, 12/24/89
5668.0 - 5675.0' PERFS UT, 4HPF, 7" 12/24/89
5675.0 - 5685.0' PERFS UT, 8HPF, 1011 7/75, 12/24/89
5736.0 - 5744.0' PERFS UT, 4HPF, 8', 12/24/89
S7r:.7 n ¡::76? 0, prRF0 IUT ';Hpr r:.' 1" 12,1 18°
v Jf.U J -' 't...! .J !, 6 , ; , ..J, L¡ r! v
Gas Well
Middle Beluga Datum: .001 MD ; .001 ¡VD ; 4041.00'
-
..
~ ìfU, if/~¡rUi Œ' rl11¡ rþ. I~\
ru¡ U I 1.Vl\; ti II
~ ~~W WW
FRANK H. MURKOWSKI, GOVERNOR
AI1A.SIiA OIL AND G~S
CONSERVATION COJ.Yl1ydSSION
333 W. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
October 22, 2004
Tim Brandenburg
Drilling Manager
U nocal
PO Box 196247
Anchorage AK 99509-3330
Re: Proposed Lewis River Field Perforating
Dear Mr. Brandenburg:
We are returning herewith your sundry application for perforation operations in the Lewis
River Field.
Weare unable to process the sundry application as filed and are returning it to Unocal for
revision. There are several errors in the information listed on Form 403. The errors
include, but may not be limited to:
1. The permit to drill number and API number are not those of the Lewis River
A-I.
2. The present well condition section of the form is not complete and does not
contain all the information presented on the schematic.
Please review and submit a revised application for the planned work.
has any questions, please contact me at 793-1250
( f~'J'
J~~orman
hairman
If you or your staff
/
SCANNED OCT 2 7 2004
PLUGGING & LOCATION CLEARANCE REPORT
State of Alaska
.ALASKA 0IL & C~AS CONSERVATION COMMISSION
PTD No. 7~'-' 00~
Lease~gt ' ~F~
Memorandum To File': API No.
Well Name
OperatOr
Location
Abnd Date .. !a[6/T~
·
Spud: ~/,,[?'fT, TD: II ~&- , Completed {Z/6(TF-
Note casing size, wt, depth, ~t vol, a procedure.
Perf inte~als - tops: ff,~ ~- ~
Review the well file, and comment on plugging, well head
status, and location clearance- provide loc. clear, code.
Plugs:
o~
, !~._
d~ ~_ ~o,.6~' ~- ~ ~.
' ' '
Well head cut off:
Marker post or plate:
Location Clearance:
Conclusions:
Code
Cities Service Oil and C~s CoFroration
Azir U. Saque~ P.E.
$ 000 8tockdale Highway
Bakmrm~,.~v~~/, California 93309
Ret CleanuF Inspection for Final Abandonment
East Lewis River No. 1, Sec. I~ TI4~, RSW,
Dear Mr, i~aque ~
Our representative inspected this well st~ on August 5, 1983 and
It was found that cleanup for £Lual abandoj~nt was satisfactory'
except that the abandonnent marker was not welded to the well
head or casing.
Subsequentl~ on Score= 4, 1983, ~. Reggie l~lk~s of .yo~ ~orage
off,ce del~ver~ p~t~ra~o of ~e ~~~t mr~ w~d~ to
Sincerely,
../ ?.:(. '
Lonn~e C. Smith
cc t Reggie Zlkins
LC$/JKT tics 103tG
Cities &
East Lewis River #1
P & A Marker - Welded to conductor pipe.
photos taken 10-2-83
Please note: Surveyor's placed yellow tape on marker since
last inspection.
MEMOF ANDUM S, te of
ALASKA OIL AND GAS cONSERVATION COMMISSION
To:c. V~ ~~terton Chai .~~/
Thru: Lonnie C. 'Smith ~¢~
Commissioner~%
FROM: Bobby Foster~J]
Petroleum Insp' ector
Alaska
DATE: August 18, 1983
FILE NO: 108B: H
TELEPHONE NO:
SUBJECT: Inspection of
Locations for
Suspension and Final
P & A. Locations
Listed Below.
Friday, August ~, 1983 I traveled this date to Cities Service's
E. Lewis"RiVer -1 and Lewis River No. 1 and inspected the loca-
tions and well markers.
ALewis River D-1 - suspended.
the attached pictures Show, the well sign is posted, the well
head secure and part of the pad is smooth. Mr. Elkins informed
me that Mr. Barrett with the Department of Fish and Game requested
the area where the reserved pit was be left in a rough condition
so planes could not land. He said he had a letter to confirm
this.
~Lewis River No. 1 - plugged and abandoned.
~ As the pictures show, the pad area is smooth and the pits are
filled. The well marker post is not welded to the well head/casing.
I told Mr. Elkins that this would have to be done before an
approval of final P & A of this well.
At t achment s
NOTE: J. K. Trimble~
Tuesday, October 4, 1983: I met with Reggie Elkins from Cities
Service Company who delivered photographs of subsequent work done
on the two well sites inspected by Bobby Foster on August 5, 1983.
Lewis River D-1- suspended.
The photographs taken OctOber 2', 1983 show that the area left in
a rough condition has been satisfactorily graded and leveled. It
is believed this well is satisfactorily cleaned up for a suspended
location.
E. Lewis River No. 1 - abandoned.
The photographs taken October 2, 1983 show the abandonment marker
which by statement of Mr. Elkins has been welded to the conductor
casing. The yellow markings were Put on the marker by surveyors.
It is recommended that this well now be approved for final abandonment.
02-00 ! A( Rev.10/79~
'ALASKA OIL AND GAS C(~S!~RVATION COMMISSION
.~-~ SURFACE ABANDONHENT REPQRT .~-x~
20 AAC 25, ARTICLE 2 ,
' ~'.1'~-~5 .~'~-/J/~:~?_m ,. Date ole P & A ,.:~: ..... "
Address .~, ~ ~, /~ o 4~~,-~ ~ ('/'Pennit
Surface Location of We%l ' - ' No.
AP1 No. 5
Unit or Lease Name
Wel 1 No..
, i ~ ) ,
Field & Pool ~:_~/A~.~
20 AAC 2~.120: WELL ABANDONMENT MARKER:
Dia. Steel Post (4"Min.)
Height Above Final Grade Level ('4' Min.j
Length (10' Min..)
Top of Mark:er Pipe ~losed with: Cement Plug Screw Cap Welds
Set: On Well Head~ , On Cutoff Casing , In Concrete Plug
Distance 'Below Final Grade Level ~" Ft., ? in.
Side Outlets: All Valves and Nipples Remov'ed ~--'
All Openings Closed , With Blinds , With Cement , Ot~er
INFORMATION BEADWELDED DIR. ECT:LY TO bb\RKER POST:
(List Where Different from File Infatuation)
Operator ~/~../..~ %~~/ Unit or Lease Name
Well Number , Surface Location of Well:
Ft. F L, Ft., F L, Sec , T , R
, ,
M
20 AAC 25.170: LOCATION CLEAN-UP
PITS:
Filled In ~,~J, Liners Removed or Buried ~/ , Debris Removed
SURFACE OF PAD AND/OR LOCATION:
Rough - , Smooth , Contoured'~., Flat
Other
, Compacted ' ,
CLEAN UP OF PAD AND/OR LOCATION:
Clean .~J/, Pipe Scrap , Iron Scrap
Paper , Other
, Wood
Mud
, Cement
SURROUNDING AREA:
Wooded , Brush
Sand , Other
· Tundra /[' Grass
, Dirt , Gravel
CONDITION Sp~R~ROUNDING AREA:
Clean ?/ , Trash from
Site
Other
, Trees and/or Brush from Clearing Site
ACCESS RORD:
Dirt , Gravel __,. Ice
..
· Other /~"/~,:~
CONDITION 'ACCESS ROAD AND SURROUNDING:
Clean ., Rough ~, Smooth ~, Trash frown Operations , ~~.~
Trees and/or Brush from Clearing Road __, Spoil from Clearing Road~/,:
Other
REMAINING TO BE DONE.: ~I.-~ '~L~Y{z/i -.. 2':., )/
RECOMMEND- ABANDONMENT:
APPROV. AL OF . s . .~, No ~. Final Inspection
INSPECTED BY ~'~~~~ ~ ~ ~ ~]"" DATE
.
~ru ~
·
ALASKA OIL AND GAS CONSERVATION COMMISSION
Hoy le H. Mami lto
Chairman /~
Lonnie C. Smith
Commissioner
Doug Amos ~
Petroleum Inspector
October 7, 1981
Conduct Abandonment
Inspection on City
Service Oil Company's
East Lewis River No. I Well
Sec. 18, T14N, RSW, S.M.
Permit No. 75-06
Thursday August 27, 1981 - I accompanied Mr. Worth Langford,
~itY-L'Serv'i6~' re~esent~%'ive, to the well site this date. As the
attached pictures show' the location is clean and returning to
it's natural state. The mud pit has been filled and mounded
with gravel. There is a prier well marker over the well head.
Although this marker has all the required information it is not
cemented or welded to the well bore. Therefore I recommend to
the commission that this location be approved for final abandonment,
after the well marker post has been permanently affixed to the
well bore, and varified by a petroleum inspector.
In summary I conducted the final abandonment inspection on City
Service Oil Company's East Lewis River No. I well. I recommend
to the commission that this location be approved for abandonment,
after the well post marker has been permmn, ently affixed to the
well bore and varified by a petroleum ins~ctor.
FILE [ NFORHATION:
Operat()r ~'~' ~ {~-~:.~',~'..) I c.e~ Date l)ownhole l' a A
Surface I.,ocatioa or-'Well '
I~,~O' Ft. F ~ L, ]c~O Ft. FM L,
Wel
Field & Pool
20 AAC 25.120: WELl, AI~'ANI)ON,~IENT NARKI']R:
Dia. Steel Post (4"Min.) 4-'~ , Length (10'
Height Above Final Grade'"'Level (4' /,lin.)
Top of Marker Pipe Closed with': Cement.Plug Screw Cap
Set: On Well llead , On Cutoff Casing , In Concrete Plt~g
Distance Below Final Grade Level [:t. in.
Side Outlets: All Valves and Nipples R~:.moved
All Openings Closed ~, With Blinds , With Cement
INFORHATION I{EAI)k'EI.I)E1) DJRICCTI.;LY TO M,~,RKER POST:
AP1 No. 50-
Unit or Lea,se N,'~me
IO
We l ds
M,o~=' '
(List k~ere Different from File Information)
Operator (__.~A .-~o~r~)\~e_ ~',1 ~-p, Unit or Lease Name
Well Number ~ , Surface Location of Well: ~ Ft F5 L . ~.~O Ft , F ¢,.~ L Sec .~ T ~.:-- "~ R 2
20 AAC 25. 170: LOCATION CLEAN-UP
PITS: b~, L ~ ,/~De
Filled In iners Removed or Buried , bris Removed
SURFACE OF PAl) AND/OR LOCAT[OU'
Rough
Other
, Smooth k~, Contoured
, Flat ~-%'-,-Compacted w/7,-~-~-'
,,.
CLEAN UP OF PAD AND/OR LOCATION':
Clean lz/~, Pipe Scrap , Iron Scrap
Paper , Other
, Wood , Hud , Cement
SURROUNI) ING AREA:
Wooded , Brush
Sand , Other
, Tundra w-'~G'r a s s
, Dirt , Gravel
CONDITION SUIJjLOUNI)[,NG Ail/':,\'
.Clean ~/'~, Trash from Site
Other
, Trees and/or Brush from Clearing Site
ACCESS ROAD.: ~--
Dirt , Gravel ~/", Ice
, Other
CONI)£TION ACCESS ROAD ANt) SURROUN1)£NG':
Clean , Rough , Smooth ~/%~, Trash from (-)l~er;~tion,~ ,
Trees and/or Brush from Clearing Road , Spoil from Clearing Road
Other
RECOHt. IEND~ APPROVAL OF ABANI)ONHENT: Yes No Final inspection
05/26/8
June 4, 1981
Cities Service Company
1016 W. Sixth Avenue, Suite 420
Anchorage, Alaska 99501
Alaska Oil and Gas Conservation Commission
Regulations Article 2, ABANDONMENT AND PLUGGING,
20 AAC 25.120 WELL ABANDONMENT MARKER and
20 AAC 25.170 LOCATION CLEAN UP.
Gentlemen~
In regard to the above referenced regulations, your attention
is called to an attaohed list of wells which, according to our
records, have not received a final location inspection and
approval of clean up. In compliance with 20 AAC 25.170 Section
(a), "Within one year of suspension or abandonment of an on-
shore well", all clean up work is to be finished. Section (b)
provides the means for an extension of time if a valid reason
exists. Section (c) provides for on site inspection.
Consequently, we are presenting the following list of your
abandoned and/or-suspended wells. Many of these are now more
than one year old and are not in compliance with regulations.
Others should have the final inspection completed this summer
while weather permits. This list covers the years 1975 to
date. There may be some earlier wells that also need inspec-
tion. If you have any earlier wells to be inspected this
summer please inform us.
Therefore, we are requesting a schedule from you for this
summer when our field inspectors can accompany your representa-
tives to these sites for the-fiD~l clean up inspection.
Commi ssi oner
LCS/JKT~be
CITIF, S SERVICES COMPANY
~. Lc.wi
Lewis ~ive'r
:~ STATE
of ALASKA
DEPARTHENT OF NATURAL RESOURCES
Division of~'Oil and Gas
/
TO: F--O. K. Gilbreth, Jr.y
Director /~~
Thru' Hoyle H. I~tamilton '
Chief Petroleum tn~ineer
~,o~: Harold R. Hawkin.s
Petrol eut?, Inspector
DATE ,June 4, 1976
SUBJECT:D(~p Test Lewi
Abandonment ~,~!']ast Lewis River ~!1
Hay 27, 1976 - Departed Anchorage at 2:00 PM with Pei~co Aviation for Beluga River.
ArriVed at Beluga at 2:30 PM.. With roe.was Ed Barber from the Division of Lands.
Randy Hicks, the operator for Cities Service, met us. Fie drove us to Lewis River
B-1. They were nipPling up. Time - 3:00 PM.
3:00~ PM, t'.~aj/ 27, 1976 - Randy lHicks, Ed Barber and I went to E~.st Lewis River #1
~6 ~§~6c-i~' the lOCati-on for abandonment. The well marker was in place, and loca-
tion data, etc. was OK.
But the location in general was not OK' for final abandonment. There was quite a
bit of debris on location and several low spots to be leveled pl~s the mud pit was
not. completely filled.
We will be contacted for final abandonment at a later date when they can 'Fill the
pit with due safety as the surrounding ground is soft.
5:00 PH - We weni~ back to Lewis River B-1. I toured the location, reserve pit
~aS Wel-1 built and bermed. The' fuel tanks are steel but not hem,,ed. The location
in general is very clean.
6:30 PM - Toolpusher MrJ Dunham for Brinkerhoff and I checked the Swaco superchoke
and actuated it and it was working fine.
7:20 PH - Toolpusher and I checked the nitrogen bottles. They tested at 900, 950,
9'75, lbs. There were only 3 manifolded up. They are to replace these bottles,
plus adding One more backup in the manifold. Master gauge on the accumulator was
1350 lbs. Time 7:45 PM.
4:15 PH, M.ay 28, 1976 - ¥!e started the BOP test. The blind rams were tested to
5000 lbs and three w~ng low torque valves on the choke manifold tested 5000 lbs.
Two manual choke valves on tl}e man,ifold operated freely. We had one failure -
one McEvoy valve bonnet' was leaking. Time- 5:00 AM. The ,~IcEvoy valves all held
on manifold to 5000 lbs. Two wing valves on the kill line and one win.q valve and
check valve were tested to 5000 lbs. The spool has 3" outlets.
5:20 AM - They are. opening blind rams and getting ready to set HcEvoy plug to
complete test. They also have remote control on the floor that is working .fine.
Blind rams opened and closed'approximately 5 seconds.
O. K. Gtlbreth, Jr. -2- Bane 4, 1976
H. R. Hawkins - Field Trip Report .,<i~,,i,'~
5:30 AM - Plug was set. Pipe rams closed approximately 5 seconds and pipe rams
-tested-to 5000 -lbs.
6:00 AM- Pipe rams opened and. the bag on the hydril was closed and tested to
13000 ihs. and held.
7:30 AM- Upper kel'lylwas tested to 2200 .lbs.
7:45 AM- Lower kelly was tested to'2200 lbs. Both held test.
In conclusion, the test was very good.
June 2, 1976 - John Miller informed me that Randy Hicks called June l, 1976.
Thr'e'e 'nitrogen bottles have been replaced and one more backup put in and mani-
folded up.
Attachment
HP~ti:bjm
, r
C' f~J Oil 911<:1 Gas çposerva,'tjon cpl. ~~;
Field Inspection Report.
;i,;,P~lg..Permjt,:N;q.76~&: ' "" ,WelllPIa tfm ' secr(TI'l¡/Rf"wI,S~t '
v,Qperator ¡::l ÎtJ.,:;1f'f'!?v/.t:El(tJ Represented byJ1/1#IJY ll/ars Name &NurnberKA~'fïi:Jlj /5 Rlt1Jf~ '
, Satisfactory" Type Inspection Satisfactory Type Inspec;tion
, Yes No Item ( ) [oca ti on ,Genera 1 Yes No I tern ( ) BOPE Tests
() 1. Well Sign () () 15. IICasinq set @
( )2. Gé,neral Houseke,eping () () 16. Test fluid..;( )wtr:-[ }mud (,Jail
() 3. R~§e,rvePit-{ )open( )filled () () 17. Master Hyd. Control Sys.- ,.R~j,Q
() 4. Rlg " () () 18. N2 bt 1 s. , , ,---"51 g, '
, (} Safety Valve Tests () () 19. Remote Control s
() () 5. Surace-No. Wells () () 20. Drilling spool- lIoutlets
() () 6. Subsurface-No. Wells () () 21. Kill Line-( ) Check valve'
( lWeI} Test Data () () 22. ,Choke Flowline ( ) HtRva 1 ve
() () 7. Well Nos. , " () () 23. Choke ~1anifold No. valvs fJ9s
( )() 8. Hrs.obser , , , () () 24. Chokes-( )Remote( )Pos.(-1Adj.
(). () 9. BS&W ',' " () (} 25. rest Plu9...()Wel1hd( )cs~{ )òone
() () 10. G'r. Bbls. , '- -' CJ () 26. Annular Pre venter, psi9
"I, " ,,' ,(J,FirralAbqodoOl11ènt C) () 27. Blind Retms" psi ~
"",'()() () 11. P&AMarker () () 28. Pipe RaIns ' psiq
(.1 () 12 .Wat~r wgll-( )capþed( }pllJgged (.1 (J29. Kelly & Kelly-coC;k psig
" ,() (K) 13. Clëän...Ùp. ' ' () () 30. Lower.Kêllyva.lve "-'-pSi~i'
,:';'-otal lnspectlonobservatlon tlme__hrsldays ".'Töt~l~umber leaks andlorequrp.fallqres ,.' " ,
,,!,Remarks -LoLA rlð~ .,' 1J../J:;rQEIUJL,JI/E~l)J [",l¡;AJ.JlV¡;; UP .,. J..fft/rZlIJ
',",', ',""ð1,Þ()'.""....'"',...s¡.',(J~f.,.'",,,",'.,.,'"",.~tÆ~'",.,.".t;"t1Jtl4'f1?/¥¡:;...',",.."...,.."'.."..,.,...,.'.,.,.'".."'."'.,", ""..,...', , ",'. .'"..,.,',"'."...,'.."',,', ."..,." ,'."..,"'."."....~'.,..",:i,<
,~r?,., ,
":¡'/.' , ,,' , " '
,',~y~:t¡A.äfí. V '.1;fl,¡l:'/:r'JC2Nötifyiri . days Or 'h'ènrèiå~â'" I rispec téd by IV - V 5' Date. ,'. "'~7 .,
'\'i-W,i,"'>"""""""',¡",;<,"', ,1
--"',,',
, .
.', '
Jf,::'r.~L..4c.ic~~~...._,:
, ' .' . '
..'"'"",."'.j'"':"""':':',i,',<.;"";",,,,,,,,:,,".:.",.,..):;...~.:;,;"..:
. .
, " ,
,;,:.",'.""','",,,,"'.,c.,; <',.:;""",."".,',.,.,.,;;',.".""",."."".".:.".">._"".;"'>"-';'c:".":,:;,,,..,.C,..,~~,.....',<i:-:-.-.",~',~;'~,~-),...,;:,-,:,.,
,
~$rt.~WI) RlvI£t1#l
~¡A Y ). 'II J' 7 ¿'
IP'«#'1"""" (~~í OK)
, ¡:I If Å lðAÞ!j} JIf~Þ'r
. - "- [,.
. -IÞ .
E h 5 -r ,J.:Jf{./ I J i< ,/6K i- 1.
,A1/t Y X 7/1.91¿
I ,4/çPf¡:r/,-v V;IT C/()
f' Á' ADP,ll I'4l¡.,1r
December 17, 1975
CITIES SERVICE COMPANY
900 COLORADO STATE BANK BUILDING
1600 BROADWAY
DENVER, COLORADO 80~'0~'
State of Alaska
Department of Natural Resources
Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99504.
ATTN: Mr. Hoyle H. Hamilton
Chief Petroleum Engine,er
RE: East Lewis River No. 1
Section 18-T14N-RSW, S.M.
Dear Mr. Hamilton:
Enclosed please find the Completion Report (Form P-7) for Cities
Service Company East Lewis River No. 1. Under separate cover (box) we are
also sending two copies of the Sidewall Core Analysis, one copy of Halliburton's
Formation Testing report for test 1-12, one copy and one sepia of the mud log,
one copy and one sepia of the following electric logs:
Dual Lateralog
Borehole Compensated Sonic
Compensated Neutron Formation Density
Proximity Microlaterolog
It is hoped that the enclosed information is sufficient and that
this will complete your state requirements. We plan to have both Lewis River
and East Lewis River locations inspected in the spring after breakup.
If there are any questions or problems, please contact me in
Anchorage at 272-9441 or in Denver at (303)892-0263.
W~. ,Ra~nd~Sincerely,
Drilling Engineer
Western Region
WRH: kl
Enclosures
Form P.--? ~ ~ ~
· ' SUBMIT IN DUPL~
--~ ~-'SI'ATE OF ALASKA
·t ruet~;~- nn
OIL 'AND GAS CONSERVATION COMMITTEE
- ii iii II i iii i
~LL COMPLETIO~ OR RECOMPLETIO~ REPORT A~D LOG*
"~.. ~'~ o~'"w~: ..... ,,~. ~" ,.~ ~ ~ '
wz~,~ w ~L DRY Other
~ ~ O~ CO~PLE~ON:
~'~LI, OVRB EN BACK RE~VR. Other
~. lq,&lm~ O1~ OPERATOR
Cities Service Company
3. Al~l~ll~ OF OPERATO~
1016 West 6th Avenue~ A~chora~e~ Alaska 99501 .
At .artace 1980 FSL and 1980 ~WL : :'
At ~ap prod. interval reported below
Same
At fetal depth
Same
13. DATIg:$PL~DDED !14. DATE T.D. RF_~Ci-EED
9/11/75 J 11/2/75
~ ^~u N~bit~uc.~ COD~-
58-283-20048
6. LE,%.L%I~ D~IGNATION A~WD SI.I.I.I.I.I.I.I.IEILLA.I~ NO.
ADL 58784
?. IF INDIAN, A.I.J.OT'rEE OR TRIBE NA~IE
· . I-IOW lVLA.NY* ROTARY TOOLS
11.63.6 TVD NA NA 0-11,636
PROI3~CING INTERVALiS). OF THIS COMPLErrI&N--TOP, BOTTOM, NAME (MD A_ND TVD)*
Plugged and abandoned
8. UNIT,FAAR.M OR LEASE NAME
East Lewis River
9~. WELL NO.
No. 1
10, F~.r~ A.ND* POOL.. OR WILDCAT
Wildcat:
SEC., T.. R., M., (BOTTOM HOL~
OBJF~'~TIVE)
..
S18-T14N-SW, SM '"
PERMIT NO.
75-6
[l~. mA~ co~ susP o~i~.xo.12/6/75 ]I~: I~-,EVATION$ IDr, RKB, RT~. GR, %'I'C)'}17. ELEV. CA$INGHEAD15! GR KB 30'
"~N'T£RV ALS d
DRILLED BY
CABLE TOOL8
None
SURLY ~E
:
i No
~t. TYPE~ ~-CT1R/C A~ND OTI4-MR LOGS RLrN
DIL. Sonic with ,GR, ,,C, omp ,Neutron, ,Formation Dens, it~, Micro Later°log Dipmeter
CASING RECORD (Report all strings set in well)
2e- I 94~) H-40 370' 26"
13-3/.8"_ 61 & 54.5 ~J-55 2375' 17~!'
9-5/~8'' 7 & 43{{~, P-110,, 98,84' [ 12~"
~. ~a ~con~. S-94, & N-80
7" _ [ 9646' ~ 11,625' I 660'
* 600 sks C~ass G with 18% salt. 117o CFR-2.
Nolle
S~
.3% HR-7
No cement used [ None
700 sks Class G I None
~15 ~ks Clas~ G I Non~
2 stakes, 16,30, sks total
ACID, SHOT, F2A~ GHE. C~%iE~ SQU~ZE. ~C.
DI~I~I II~f~iRVA~ (MD) A.IiOUNI' Z'~ND KIND OF MA,TI:~AL USIiiD
aO. PRODUCTION
DAT~:F~IIST PIR~)DUC~I'ION [ ~DU~ION ME'iHOD (Flowh~g, gas litt, pump~g--si~ ~d tY~ of p~p)
_
rm.w. TUB~G' .~LNG P~SU~ ICALC~~ OI~BBL. ' 24-HOUR RA~
31~O81TION OF ~s (~old, used for/ual, vented, etc.)
'lnf'orn~atioa ia c'o'~,'ple{~ and correct as det~r'~'lned from all-available records
33. ]~ ~ereOy cert at the foregoin a
~ illl i i ~ I i ii i ii ii ii I I
*(~e Instructions and S~ces [or Additional Data on Reve~ Side)
INSTRUCTIONS
General: This.'form is desigr~ed for submitting: a:complete and correct::w~li completion report 'end. :log on-
all types of lands and leases in Alaska.
.
:Item: 16: Indicate which elevation is ~sed as reference (where"n6t otherwise shown) for ;depth measure-
ments given in ather spaces on this form and in any attachments. ' : ; i :
~ ~ "' ': '~ · - i
Items 20, and 22:: If this well is completed for s. epar,ate~l production from-more than on~, interval zone
(multiple completion),, so state in item 20, and in item~ 22 show the prc<Jucing interval, Or intervals,
top(s), bottom(s) and name (s) (if any) for only the inter~,al reported in_ !ter~ 30. Submit a 'separate report
(paoe) on this form, adequately identified, for each ~dctiti°nal [ntelv~al ,t01be separately produced, show-
ing the additional data 'pertinent to such interval. : ~-----~ . '. ~ ! i: '.
I~m26: "Sacks Cement": Attached'suppleMental records for thi~ Well'shOuld show the details Of ahi/' mul-"'--
tiple stage cementing and the location of the cementing ..
~ .
Item 28: Submit a separate completion report ;on thi~ f0rm...tior.Jeach .D{ter~,al to be separately prOduced.
(See instruction, for items 20 and 22 above). ": : t ' i ,~ '- :,
I I I I I I I J ! ! III I J LI I I
] ~ ' : ' ',' ' WA~ AND MUD~ ' ,, ' ' ; '-.~ '..' ': ; i ~ } : ,
i i i m i i , .. . ~ ,., · , , . .
.....
ill. Sta Test data ,attached i... -.
,
~' ; ~ .... ~' ~ ~ i I ~',~
"~ ~ ~ ~" ' ' ~ ~.~t ,.:~, i ~ i I ,:.'t ,4899
, ~; ....... BelUga
~"' ,' · '.:,, ~ ~' ,.;.i- .... , '- ~ ~;: ~
' '
'
~J CO~ DATA.' A~ACI[.BRIEF D~CEIPmONS OF LITIlOLOGY.., POROSITY,
.
I i I I Il Ill i I I J j i
.... ~ ' ·
, . .
, , , ,, J u ,, ,
CONFIDENTIAL
CORE LABORATORIES.
OALLA$, TEXAS
Page No._ I OF )
CORE ANALYSIS RESULTS
Company,
Well
Field
County
SAND
SNALI'.I#
LIId[ .
Cit}es Service OilCompany
East Lewis River//1
.Wildcat
Mat-Su State AK
DOLONITE-DOL ANHYDRITE-ANHY
CHEAT-CH COHGLOMERATE-CONa
GYPSUM-GyP POSIILIF[ROUI-FOS.
Formation
Core Type. Slde Wall
Drilling Fluid,
Elev._ .Location.
Lithological Abbrevia!ions
.
SANDY · IDY FINE. IFN CRYSTA LLIN[ - XLN
IHALY - IHY MEDIUM. MID GRAIN - GAN
LI~4Y. LHY COARSE · CS[ GRANULAR - GRNL
YUGGY ·
Fi]e__B~4 ,.
Date Report 11-4-75
Analysts_ WSP
FR&CTUR iD. FN&C
LAMINATION. LAM
ITYLOLITIC - STY
SLIGHTLY-IL
WI T H - W/
SAMPLE
NUMBER
D£PTH
FEET
Max. Vert.
Perm. Perm.
Om.
Dens
RESIDUAL SATURATION
PER CENT PORE
J TOTAL
OIL WATER
SAMPLE DE SCRIPTI~:)N
AND REMARK$
10165
1017O
10175
10180
10679
10681
10685
10815
10822
1O824
10838
1O881
10883
1O887
1O889
10893
10906
11O30
11O38
11O7O
11O8O
11090
11248
11253
11290
11298
11306
24
23
9.6
15
0.8
5.7
149
131
212
97
70
3.4
68
122
235
20.3 2.74.
20.2 2.72
20.7 2.74
25.9 2.73
23.4 2.74
18.5 2.70
28.9 2.73
24.9 2.67
25.0 2.68
24.7 2.60
25.2 2.68
24.5 2.67
18.5 2.69
20.1 2.67
26.1 2.66
31.4 2.65
0.0 79.8
0.0 87.5
0.0 73.8
0.0 81.9
0.0 69.1
0.0 87.6
0.0 71.2
0.0 55.9
0.0 70.7
0.0 80.8
0.0 75.7
0.0 86.0
2.3 81.5
0.0 82.1
0.0 78.9
0.0 83.4
ss; vf-Fg, cly
same
same
same
same
ss; vFg, sltst
ss; vF-Fg, ely
ss; f'-mg, cly
ss; F-rog, cly
ss; f-cg, cly, sc, carb
ss; vF-Fg, cly
ss; F-mg, cly
ss; vFg, v slty
ss; [-cg, peb, cly
ss; F-'mg, ely
ss, mg
:611-1
'JJJ}I Ii T [ CORE LABORATORI ES. INC.
Petroleum Reseruoir Engineering
DALLAS, TEXAS
CORE ANALYSIS RESULTS
Page No.
CompanF C3fies_Service Oil Com_p~n_~y__ Formation,
Well Eost Lewis River #1
Field W/C
County~ _ Mot-$u __State ,AK
SAND-SC) DOLOHITE*DO1 ANHYDRITE[. ANHY
SHALi' - SH CHE[RT -CH CONGLOH IrRATE -CONO
LIME[ - LI4 GYII'SUM *GYP FOSS I LIF lr'ROUS - FOBS
Core Type, Diamond Core
Drilling Fluid
Elev._ Location_
Lithological Abbreviations
SANDy ·SDY tiNE. IrN CRYSTALLIN [ - XLN SROWN · SRN
SHALY- SHY MEDIUM -MI~D GRAIN oGRN GRAY - GIy
LIMY - LMY COARSE - CSE GRANULAR - GNNL
File___BE-_2~:162
Date R eport.__l_0~1~-75 ....
Analysts_ WSP
FRACTURED. FRAC
LAN ! NAY ION - LAM
Il? Y LOLI'I' lC ·
ILIGH?LY. ILj
WITH-W/
SAMPLE
NUMElER
1
2
3
4
5
6
7
8
9
10
11
'12
13
14
15
16
17
18
19
20~
21
22
23
24
25
26
DE PTH
FEET
RESIDUAL SATURATION
P E R M E A El I L I T Y POROSITY PER CENT PORE ra| n
M I C L i O A R C Y $ j PER CENT I OIL J TOTAL
'"ATE. IDens~ fy
5948
5953
5957
5963
5975
5982
5993
6009
6013
6026
6210
6220
6226
6526
6642
.6644
6648
6650
6656
6912
6914
8130
8177
8880
8890
9547
0,5 20,1 0.0 88.5 2.61
9.4 20,0 0.0 86.7 2.61
294* 15,9 0.0 74,6 ....... 2,49
0.6 15.4 0.0 82.6 2,59
1,5 16,4 0.0 71,7 2.58
58 13.8 0.0 78,8 2,69
88 15.2 0.0 83,8 2,64
38 15,3 0.0 84.4 2, 63
3.5 14,6 0.0 82.9 2,65
70 11.6 0.0 51.8 2,70
17 13,9 0.0 82.4 2.71
34 13,2 0.0 72.5 2.69
0.9 19,3 0.0 88.5 2.62
0,6 17.7 '0.0 92,5 2,59
2,3 17.2 0.0 83.2 2,61
26 23,0 0.0 67.4 2,73
56 .19.2 0.0 58,8 2,55
46 20.1 O. 0 68.9 2.69
0,7 16,8 0.0 97.2 2.72
0,2 12.5 0.0 92,7 2.69
1,3 17,5 0,0 72.1 2.65
0.0 18,3 0.0 86.1 2.58
101 17.4 0,0 83.4 2,61
117 21.6 0.0 82.,1 2.60
50 23,6 O. 0 68.8 2.71
SAMPLE DESCRIPTION
AND REMARKS
sltst, cly
ss; vFg, sc carb
Coal
sltst, cly *Fracture
si tst, cly
ss; vFg, slty
ss; Fg, pebbly
ss; F-cg, pebbly
ss; Fg, pebbly
sltst, cly, sdy
ss; Fg, pebbly
same
ss; v Fg, pebbly
ss; vFg, slty
ss; vFg, v si ty
same
ss; Fg, slty, cly
some/carb
ss; vf, mg, slty
si tst, cly
si tst, cly
same//sdy
same
ss; F-cg, cly
ss; Fg, ely
same
These analy~cs, opmons or interpretations arc ba~cd on observations and materials supplied by thc chent to whom,)a~d~,l, qt,.~:~s~ exclusive and c(,nfidentlal usc,
this report is made. The interpretations or opinions expressed represent thc best judgment of Core Laboralories. lh~)~5{~l~f}&r~, and omissions excepted); but
Core ~boratorics. loc. and ils o~icers and employees, a~ume no reSl,on~ibihty and make no warranty or reprcsental~ons, as to the productivity, lropcr opcrali0ns,
or l)r~t'abtcnF.~.o~ en~-oil, gas os' ~:hcr mineral well or sand in connect;m with which such report is used or relied upon.
FLU ID SAMPLE DATA -- . ~Ticket
Date 11-30-75 Number 817877
Sampler Pressure P.S.I,G. at Surface Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE
cc. Oil
cc. Water Tester FREITAG Witness REINER
cc. Mud Drilling
Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY NH
Gravity ° APl @ °F. EQU I PM E N T & H OLE DATA S
Gas/Oil Ratio cu. ft./bbl. Formation Tested -
RESISTIVITY CHLORIDE Elevation ] 5" Ft.
CONTENT
Net Productive Interval 63] 6' - 69J cJ, Ft.
Recovery Water @ °F. ppm All Depths Measured From Kelly Bushing
Recovery Mud ~ @~ °F. ppm Total Depth 80'J 'J ' ,Ft.
Recovery Mud Filtrate @ °F. ppm Main Hole/Casing Size 9 5/8"
Mud Pit Sample ~ @~°F. ppm Drill Collar Length93.80'I.D. 2.25"'
Mud Pit Sample Filtrate @ °F. ppm Drill Pipe Length - I.D. -
Packer Depth(s) 6280'
Ft
Mud Weight 12.2 vis _ cp Depth Tester.Valve 6247' ...... Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cushion NONE Ft. Pres. Valve NONE Choke 3/8"& 3/4" Choke 5/8'm
·
·
Recovered Feet of REVERSED OUT...
·
Recovered Feet of
Recovered Feet of
Recovered Feet of .....
Recovered Feet of
Remarks SEE PRODUCTION TEST DATA SHEET...
CHARTS INDICATE PARTIAL PLUGGING DURING THE INITIAL FLOW PERIOD.
--
,
Gauge No. 2859 Gauge No. 2858 Gauge No.
TEMPERATURE TIME
Depth: R?R7I Ft. Depth: 6301' Ft. Depth: Ft.
7Z~o-rC)ock 72 HourCIock HourCIock Tool 11-29-75~.M.
Est. °F. BlankedOff Nn BlankedOff yp~ BlankedOff Opened 16'45>.M.
6302' @ Opened 11 - 3 O- 7k5~.
~ctual 112°F. Pressures Pressures Pressures Bypass 11 ' 3CM.
,, ,
Field Office Field Office Field Office Reported Computed
-initial Hydrostatic~ 4167 4117 4187 4156 Minutes Minutes
~3 Initial 251 276 ! 247 331 ,.
.~_.c Flow FinaI 25l 327 ' 271 333 3UI JUZ
~ ~ .....Closed in 2922 2955 2953 2956 b 14 b I Z
.0~ ~nitio~ 251 304 247 333
c'o
~o,c Flow
~ ~ F~nol 251 337 296 346 1 20 1 22
Closed in 2922 2945 2953 2 948 1 90 189
Initial
~ Flow
~ .......... Fir, o~
·
Closed in
Final Hy'Jrostatic' 3967 3985 3940 4002
FORMATION TEST DATA
6316' - 6332' 6522'-6530~ ~.~ ' .... , ' ' '
Cosing perfs. 6644'-6650-.. Bottom choke 5/8" Surf. temp 10 'F Ticket No, 817877
Gas grovity. 6911 ' - 6919' .Oi~ aravi~ C.~R ...
Spec. gravity ,., Chlorides ppm Res. @ 'F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USEI) , ,,
Date
Choke Surface Gas Liquid
Time a.m. Size Pressure Rate Rate Remarks
p.m. psi MCF BPD
16-42 Set tools.
16'45 Tool opened with a strong blow througl
16-55 ¼" hose into a 5 gallon bucket.
17-15 5 PS[
19:00 3/4" " Gas to the surface - small flare
20-32 10 PSt '~ Closed on surface for sample.
20-50 3/4" Opened well. "'
21'46 Shut well in.
11,30-75
06-20 3/4" 27 PSI Opened well to flare ·
08- 20 3/4" 0 PSI Shut well in.
08-22 Reversed out the test.
11-30 Pulled tool loose.
---
--
--
.................. ,,,,,.,.,,. PRODUCTION TEST DATA
I
e No. 2859 j Depth
First First
Flow Period Closed In Pressure
Time Deft. PSIG Time Deft. t -}- ~)
Temp. Log
.000" Corr. .000"
·'000
PSIG
Temp.
Corr.
.000 276 327
.334 327 .0403 1736'
.0783
.1164
.2305
· 3827
· 4588
.4969
.5349
2406
2751
2880
2920
2935
2943
2948
295O
2950
2950
2955
2955
2955
2955
.5730
6267'
Second
Flow Period
Time Defl.
.000"
· 000
.0249
.0475
.0701
.0928
.1154
· 1380
PSIG
Temp.
Corr.
304
269**
334
339
339
337"
337
Clock No. 10431
Second
Closed In Pressure
Time Deft.
.000"
.000
, .0224
.0460
PSIG
Temp.
Corr.
337
445***
1756
.0696 2404
.0933 2716
.1169 2850
.1405 2900
.1641 2923
.1877
.2114
.2350
2935
2940
2945
J
Ticket
72 hour No.
Third
Flow Period
Time Deft.
PSIG
Temp.
Corr.
817877
j,
Third
Closed In Pressure
Time Deft.
.000"
Temp.
Corr.
re No. 2858 Depth
· 000 .000
· 340 333 .0406
.0789
PLUGGI .1172 2762
Intervol
REMARKS: * I
.1555 2885
.1938 2926
.2322 2941
.2705 2946
.3088 2951
.3471 2953
.3854 2956
.4238 2956
.4621 2956
· 5004 2956
.5387 2956
.5770 2956
6301'
· 0921 346
.1145
.1370 346
Clock No. 10394 hour 72
o000 346
.0203 1681
.0417 2324
· 0631
. O845
.1059
.1274
· 1488
.1702
.1916
.2130
19"
2658
2826
2885
2916
2929
2939
2943
2948
Minutes
FORM 18;]-R1--PRINTED IN
SPECIAL PRESSURE DATA
I. ITT~E'$ 96673 75¢ ~/74
? \
Drill Pipe or Tubing
Reversing Sub ......................
' ' O.'D.
I. Do
TICKET NO.
LENGTH
817877
DEPTH
3.00"
i .00:
6134'
Water Cushion Valve ................
Drill Pipe
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve -. ..................
Dual CIP Sampler ..................
Hydro-Spring Tester ................
LOCK-OPEN BYPASS
Multiple CIP Sampler ...............
Extension Joint ....................
5.00 n
4.75"
5.00"
5.00"
5.00"
5.00n
5.00"
5.00"
8.10
2.88"
3.88"
3.88"
I
2.25"
2.25'*
1.00"
.87"
3.75"
.87"
1.00"
1.62"
2.26"
62.52;
4.87;
34.49;
5.31 '
3.18'
7.15'
4.14'
5.09'
3.03'
'.
4.62'
8.67'
3.99'
1.00'
6203'
OK_.UO
6241'
AP Running Case ..................
Hydraulic Jar .....................
6267'
6280'
6301 '
6302'
VR Safety Joint ..................
Pressure Equalizing Crossover .........
Packer Assembly ...................
Distributor ........................
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case .......
.~;~.,kr~<~, . .HT.-. 5.0.0..TE.MP.. DE.V.!C. E
Anchor Pipe Safety Joint ............
Packer Assembly ...................
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor ..................
Drill Collars ......................
Flush Joint Anchor ..................
Blanked-Off B.T. Running Case ........
Total Depth .......................
8011'
L. ITTL.~'$ gee7e 7~C 1/14
EQUIPMENT DATA
:~1 to 1000 p.s.i.
FLU ID SAMPLE DATA ~-.- ' Ticket
Dote 11-12-75 Number 817708 ,
~o
Sampler Pressure .P.S.I.G. at Surface Kind Halliburton
Recovery: Cu. Ft. Gas of JobH00K WALL TEST District ANCHORAGE
cc. Oil
cc. Water Teste~R. BOATMAN Witness MR. HARMON
cc. Mud Drilling
Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY '" PW S
Gravity ° APl @ °F. EQ U I PM E N T & H O L E DATA
Gas/Oil Ratio cu. ft./bbl. Formation Tested TYONEK
,.m,I
RESISTIVITY CHLORIDE Elevation 15 m Ft 2o
CONTENT
Net Productive Interval 20 ' Ft,
Recovery Water ~ @~°F. ppm All Depths Measured From Kelly Bushing 36' ..
Recovery Mud ~ @__ °F. ppm Total Depth 11478' PPD Ft. z
Recovery Mud Filtrate ~ @ ~°F. ppm Main Hole/Casing Size 9 5/8" _ 7,, 1 iner ,
Mud Pit Sample @ °F. ppm Drill Collar Length 373.58' I.D. 2 1/4"
Mud Pit Sample Filtrate @ °F. ppm Drill Pipe Length 1499.52' - 9309'1.D. 3.476" 0o
Packer Depth(s) 11 201, .Ft.
Mud Weight vis cp Depth Tester Valve Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cush~on KCL Water 5000' Ft. Pres. Valve Choke 3/4" Choke 3/4"
.
·
Recovered Feet of
·
Recovered Feet of -
Ir--
Recovered Feet of
Recovered Feet of ~
Recovered Feet of
Remarks SEE PRODUCTION TEST DATA SHEET .....
..
Gauge No. 1108 Gauge No. 11 07 Gauge No. --I
TEMPERATURE TIME
Depth: - 111 R5 ~,t. Depth: 11213m Ft. Depth: Ft. CZ:
72Hour Clock 7ZNour Clock Hour Clock Tool A.M.
Est. CF. ""Blanked Off NO Blanked Off Yes Blanked Off Opened 2' 05 P.M.
11218' Opened A.M.
~Actuol17~ °F. Pressures Pressures Pressures Bypass P.M.
Field Office Field Office Field Office Reported Computed
Initial Hydrostatic 8911 8899 8964 8964 Minutes Minutes
~ Initial 2171 2575 I 2265 2635
Flaw Final 2992 2975 3032 3020 600 291
Closed in 325
!~ Flow Initi°l 5146 5209 5185 5258
)u°'~ " Final
:~ 5251 5209 5270 5258 222
Oosedin 8311 8293 8357 8353 289
..,
~o Flow Initial
~. Final
Closed in
- Final Hydrostatic J RR7q RRfi~ Rql g
FORMATION TEST DATA
LITTLE'S 96671 ION4 8/74
ouo ,Bottom choke Surf. temp *F Ticket No~ 8l 7708
Casing perfs
Gas gravity. Oil gravity. GOR ..........
Spec. gravity _Chlorides ppm Res.
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
Date
Choke Surface Gas Liquid
Time a.m. Size Pressure Rate Rate Remarks
psi MCF BPD
11-12-75
2:05 Opened tool with a weak blow on bubble
hose,
7:50 Loaded drill pipe wi th fresh water an¢
tried to pump into formation with 650C
PSI - ope~ied bleeder and bled off to
0 pressure in 15 minutes, Flowed
·
rate 19.6 BPD water cushion.
12:05 Closed tool.
3:00 Reversed out. Recovered cushion plus
3 bbls of rat hole mud and 15 bbls.
of water.
5:30 Pulled loose
..-
,,,, ,, ,, , , ,
'° .... ' ...... PRODUCTION TEST DATA
Gauge l'qo.
First
1108
First
I Depth
11185
Second
Clock No.
10431
Second
JTicket
72 hour No.
Third
817708
Third
Flow Period
Time Deft.
.000"
000
PSIG
Temp.
Corr.
2575
2746
....
2821
2875
Closed In Pressure
Time Deft. - t -J- {9
.000" LogT
PSIG
Temp.
Corr.
Flow Period
Time Deft. PSIG
Temp.
.000" Corr.
,0~)0 5209
,243 5209
Closed In Pressure
Time Defl.
.000"
· 000
.0249'*
.o~55
.0661
LooZ--
PSIG
Temp.
Corr.
5209
6720
7063
7289
2908 .0867 7460
2942 .1072 7598
2975 .1278 7707
· 1484 7799
.1690
7874
.1896 7950
.2101 8017
.2307
.2513
.2719
.2925
8071
8134
8197
8251
Flow Period
Time Deft.
.000"
PSIG
Temp.
Corr.
Closed In Pressure
Time Deft. Log~-~
.000"
.3130 8293
PSIG
Temp.
Corr.
Gauge No. 1107
Depth 11213' Clock No. 10394 72 hour
J . 000
.0512;
· 1058
3 .1603
45 .2149
.2695
~ .3240
'°I
11
13
I Reodin~ In~ervol
r~I R£~RK$:
2635
.000
2803 .247
2876
5258
5258
.000
· 0256 *'
· 0468
5258
6786
7126
2924 .0680 7356
2956 .0891 7530
2988 .1103 7664
3020 .1315 7769
.1527
.1738
,1950
.2162
19
49
,2373
,2585
.2797
.3008
,3220
7858
7935
8008
8076
8129
8193
8257
8313
8353
Minutes
* : 46 minutes **: 23 mi,-,utcs
SPECIAL PRESSURE DATA
Drill Pipe or Tubing ................
Reversing Sub ......................
Water Cushion Valve ................
Drill Pipe ........................ .4"
Drill Collars ......................
O.D. I.D.
TICKET NO.
.
3.476'"
1499.52'-9309'
Handling Sub & Choke Assembly ......
Duo~ CIP Vo~,e .................... 3. 7/8"
Dual CIP Sampler ...................
Hydra-Spring Tester ................
, ,75"
7.50'
Multiple CIP Sampler ...............
817708
DEPTH
11178'
Extension Joint ....................
AP Running Case .................. 3 7/8"
4.69'
11185'
Hydraulic Jar .................... 3 7/8" . 1.25"
5.73'
VR Safety Joint ...... BYPASS ..... 5"
Pressure Equalizing Crossover ......... 4., 18"
2.44"
2"
2.18"
2.44"
·
3.78'
3.15' ',
Packer Assembly ................... 5 · 70"
5.3'
11201'
Distributor .... PERFORAT I 0NS .....
2_. 7/8"
8.71,' ....
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case ....... 3 7/8"
4.07'
11213'
Drill Collars ... HT...-...500 ......... 3 7/8" ,
Anchor Pipe Safety Joint ............ '
11218'
Packer Assembly ....................
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor ..................
Drill Collars ......................
Flush Joint Anchor '
Blanked-Off B.T. Running Case ........
Total Depth .......................
EQUIPMENT DATA
11478'
LITT/['$ glt?l 71¢L74
TIME
I~ach Horizontal Line Equal to 1000 p.s.i.
~- ~ Ticket
FLUID SAMPLE DATA Dote 11-13-75 Number 817851
Sampler. Pressure .P.S.I.G. at Surface Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL TF. ST District
cc. Oil ~'~- ·
cc. Water Tester [~o BOAT~ Witness
cc. Mud Drilling
Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY PW S
Gravity ° APl @ °F. EQU I PM E N T & H aLE DATA
Gas/Oil Ratio cu. ft,/bbl, Formation Tested
RESISTIVITY CHLORIDE Elevation Ft,
CONTENT
Net Productive Interval 370 ~ Ft.
Recovery Water @ *F. ppm All Depths Measured From Kelly Bushing
Recovery Mud -- @-- °F. ppm Total Depth 11225' Ft.
Recovery Mud Filtrate ~ @--°F. ppm Main Hole/Casing Size 9 5/8" - 7f; liner
Mud Pit Sample -- @--°F. ppm Drill Collar Length 342.23 w I.D. 2.25tw
Mud Pit Sample Filtrote~ ~~°F. ppm Drill Pipe Length 89507 I.D. 3.826"
Packer Depth(s) 10855 ' Ft.
Mud Weight 14o 8 vis cp Depth Tester Valve 10840' Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cushion KCL Water Ft. Pres. Volve Choke Choke .62"
Recovered 5000 Feetof Water KCL cushion.
Recovered Feet of Formation water.
Recovered Feet of
<
Recovered Feet of
Recovered Feet of
Remarks SEE PRODUCTION TEST DATA SHEET .....
,
Gauge No. 1781 Gauge No. 1526 Gauge No.
TEMPERATURE TI~E
Depth: 10841' rt. Depth: 10871' Ft. Depth: Ft.
72 HourClock 72 HourClock HourCIock,,; Tocl11-13-75 A.M.
_Est. 180 °F. Blanked Off'No Blanked Off ~es Blanked Off Opened 10,: 28 P.M.
Opened il-
_Actual °F. Pressures Pressures Pressures Bypass
Field Office Field Office Field Office Reported Computed
-initial Hydrostatic 8579 8600 863-8 ~63 9 Mi,~t,~ ~i,ute~
- Initial 2~-96 2725 12693 2734
~.: Flow __
[& F~no~ 4371 4434 4440 4450 1305 1304
_ Closed in 7175 7214 7200 7234 292 293
Initial
'~o Flow-
~° 'z Final
Closed in
-- Initial __
~=_o mow
Closed in
--Fin°l Hydr°static / 8544 8568 8605 8605
~'O~M t81.RI--PRINTI~I~ IN U.S.Ao
FORMATION TEST DATA
· i
10911' - 10917'
Casing perfs. 10892 ' - 10902 ' .62"
Bottom choke Surf. temp 3 o °F Ticket No. 817851
Gas gravity. .Oil gravity GOR
·
Spec. gravity. ~Chlorides ppm Res. @ °F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
Date I Choke Surface Gas Liquid
Time a.m.I Size Pressure Rate Rate Remarks
p.m. psi MCF BPD
11-13-75
10:28 Opened tool with a light bubble hose
blow off 5 gallon bucket. (1/4")
(Blowing slightly before set tool)
10:50 3 Bubble hose in 5 gallon bucket increa~
very slowly to a heavy blow.
·
3/4"
11:28 3/8"- 4~ Bled down supercharger, s.
11-19-75
08:13 1/2!' Closed tool.
·
·
Light brow on 1/4" bubble hose in 5
ga lion bucket..
11:18 Started reversing fluid.
13: 05 Pulled loose.
-.
·
·
.
·
.. .
First
Flow Period
1781
J Depth
First
Closed In Pressure
Time Deft. PSIG Time Deft.
Temp.
.000" Corr. .000"
.000 2725 .000
Lo0 -
· 148 3066
,2934 3237
,4378 3436
· 5823
1,O
PSIG
Temp.
Corr.
4434
,01464- 5677
,0372
,0597
6133
6361
10841 ' Clock No. 10431
Second
Flow Period
Time Deft. P$1G
Temp.
.000' Corr.
PSIG
Temp.
Corr.
3610 ,0822 6519
3774 . 1048 6639
3923 , 1273 6733
1 160 4192
6814
1498
,1724 6884
,1949i 6947
4434 °2174! 7000
,2399
,2625
No. 1526
,000
7056
7102
7144
Second
Closed In Pressure
Time. ooo,,Defl. Loo-~
Ticket
72 hour No.
Third
Flow Period
Time Deft.
.000"
PSIG
Temp.
Corr.
817851
Third
Closed In Pressure
Time Deft. tog.~
.000"
·
P$1G
Temp.
Corr.
,2850
· 3075 7179
,3300 7214
Depth 10871' · Clock No. 10394 72 hour
,000
,0146
4450
; 3074 ~* 5757
°2970 3242 ,0372 6185
,4433 3440 ,0597 6407
· 5895 3617 ,0822 6529
6677
6768
6848
6919
6976
7000
7080
7124
7167
7204
· 1048
,7358 3782
,8820 3930
,1273
4070 ,1498
1, 1 4205 , 1724
43 29 .1949
1 4450 ,2174
,2399
,2625
,2850
.3025
2O
.3300
Interval 130
REMARKS:
7234
* = 134 minutes ** = 13 minutes
. .
Minutes
---- .,ILL J ,
SPECIAL PRESSURE DATA
Drill Pipe or Tubing ................
Reversing Sub ......................
Water Cushion' Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve ...................
!.1.!,
Hydro-Spring Tester ................
Multiple ClP Sampler ...............
Extension Joint ....................
AP Running Case ..................
Hydraulic Jar .................
.
VR Safety Joint ........
Pressure Equalizing Crossover .........
Packer Assembly ...................
511
4 1/2"
4.75"
3.88"
4.75"
3.88"
3.88"
3.88"
3.88"
5.70"
Distributor ........................
Packer Assembly ...................
Flush Joint Anchor ................. 2 · 87"
Pressure Equalizing 'Tube '
Blanked-Off B.T. Running Case ....... 3.88"
~ . .HT..5.0.0. T.e.mp. R.e. qpTder3 · 88"
Anchor Pipe Safety Joint ............ '
Packer Assembly ...................
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wali Anchor ..................
Drill Collars ......................
Flush Joint Anchor '
·
Blanked-Off B.T. Running Case ........
Total Depth .......................
2.2.3"
3. 826"
2 1/4"
.88"
2.25"
.62"
3.00"
1.25"
.75"
2.36"
2.48"
.~ICKET NO. 817851
LENGTH
1.OO~
DEPTH
10729.87 '
8950'
342.23'
7.16'
34.03'
6.29'
4.59'
5.10'
3.22'
3.68'
9.34'
·
4.07'
.98'
10800 '
10840 '
10841 '
10855 '
10871 '
10872'
11225'
EQUIPMENT
DATA
LITTLI['I g~?~ 1tic 1/71
TIME
Each Horizontal Line Equal to 1000 p,s'.i.
F L'U I O S A M P L E O A T A . Date 11-9-75 Number 817707
Sampler Pressure .P.S.I.G. at Surface Kind Halliburton . __
Recovery: Cu. Ft. Gas of Job HOOK WALL 'TEST District ANCMOF, AG~.
cc. Oil
cc. Water Te~ter ~. BOA~IAN Witness ~R.
cc. Mud Drilling
Tot. Liquidcc. ControctorBRI~(E~{OFF DRILLING C01~AN~
Gravity o APl ~ °F. EQ U I'PM E N T & H O L E DA TA 'PW S
Gas/Oil Ratio cu. ft./bbl. Formation Tested - '~onek
RESISTIVITY CHLORIDE Elevation 15 ' 'Ft.'
CONTENT ....
Net Productive Interval 5 * Ft.
Recovery Water @ °F. ppm All Depths Measured From. Ke 11¥
Recovery Mud @ °F. ppm Total Depth 11478' PoB.T.D. ,.Ft.
Recovery Mud Filtrate @ °F. ppm Main Hole/Casing Size 9 5/8" - 7'i Liner
Mud Pit Sample '@ °F. ppm Drill Collar. Length 373.58t I.D. 2' '/77~''
Mud Pit So. mple Filtrate @ °F. --ppm Drill Pipe Length 1499.52'-93'39.94~.0-7- 3.826'~
Packer Depth(s) 1123 2 *
Ft.
Mud Weight ' vis cp Depth Tester Valve 11214' Ft.
TYPE AMOUNT Depth Back Surface 3 / 4" Bottom
Cushion Water 11213' Ft. Pres. Valve ChokeBubbl~,~Je Choke 5/8"'
Recovered Feetof · . i ~ ~
t / ·
Recovered Feet of
Recovered Feet of /
:~ ' ~ bO~. ,
,-..'.,,.::.-. / '
Recovered Feet of .... "-' ..... ~":':o'a /
Recovered Feet of
Remarks CHARTS INDICATE PRESSURE RELIEF VALVE IN DIfAL CLOSED IN PRESSURE
·
TOOL OPENED DURING CLOSED IN PRESSURE PERIODSo FORMATION PRESSURE GREATER
,
THAN HYDROSTATICS.
SEE PRODUCTION TEsT DATA SHEET FOR REMAINDER OF REMARKS .....
Gauge No: 2859 Gauge No. 2858 I Gouge'No.
I
TEMPERATURE TIME
, ,Depth! 11219t F,t. Depth: t1244~ Ft. Depth: Ft.
72 Hour Clock 72 Hour Clock Hour Clock Tool A..M.
Est. °F. .Blanked Off No Blanked Off Yes Blanked Off Opened 7: 24 =~.M.
1124'9 ' Open,ed A.M.
..
Actual 2~,3 °F. PFessures Pressures Pressures: Bypass 8: 17 P.M.
Field ' Office I Field Office Field Office Reported Computed
,
l'hitial Hydrostatic 8261 8268 I 83-23 8286 Minutes Minutes
Initial 5064 5101 ]5077 . 5094 ,__
· -~o Flow Final I 5114 5129
m-r. -- '510i ' J 5106 61' 68
Cosed i4" '8285 8266 8323 I 8281 121 136
== 'InitialI 5114 5141 5101 '5i14
c o Flow , _
!°u'C- FinalI 5139 5i48 5101 5119 360 400
Closed in
.
.o-o initiO! 3819 3816 3768 3798 ' __.
Closed in J 8261 8259 8225 8264 m m 495
Final ~vdr0st~tic I 8261 ' 8207 8225 8208
FORM I81-R1--PRINTED
FORMATION TEST DATA
LITTLE'S gll?l IOM il/74 /,~ A
Casing perfs. 11293 ' _ 11298 ' 5~8" '
, Bottom choke Surf. temp 'F Ticket No.817707
Gas gravity Oil gravity GOR
Spec. gravity. .Chlorides ppm Res. @ °F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
Date I Choke Surface Gas Liquid
I Time a.m.I Size Pressure Rate Rate Remarks
p.m. psi MCF BPD
11-W-75
7:24 Opened tool. Closed at the surface.
7:34 3/4" Opened on 3/4" choke. Small stream
water at flare line.
8:25 Closed tool.
10:26 Reopened tool. Closed at the surface.
10: 28 350
10:31 2/4" 400 Opened at the surface. Pressure bled
off quickly.
. r,
10:45 " Small stream of water cushion,
4:26 · Pulled loose
Pulled 3000' of pipe,. Dump water
cushion.
Ran back 3000' dry pipe.
8:02 Opened with a weak bubble hose blow
throughout test,
ll_lO_~5 --
12:02 Closed tool.
6: 00 Reversed out.
8:17 Pulled loose and out of hole.
Recovered water between hydrospring
_o
and dual closed in pressure valve.
,
PRODUCTION TEST DATA
G~uge INo.
First
Flow Period
2859
Time Deft.
.000"
PSIG
Temp.
Corr.
I Depth
First
Closed In Pressure
Time Deft.
.000"
PSIG
Temp.
Corr.
.000 5101 .000 5129
.0079~ 5158 . 136 8266
o0177
5089
11219~
Second
Flow Period
Time Dell. PSIG
Temp.
.000" Corr.
· 000 5141
· 400 5148
Clock No.
10431
Second
Closed In Pressure
Time Deft.
.000"
,o0
PSIG
Temp.
Corr.
JTicket
72 hour No. 817707
Third
Flow Period
Time Defl.
.000"
· 000
.0472.~
' .0913
PSIG
Temo.
Corr.
3816
3866
3903
Third
Closed In Pressure
Time Deft.
.000"
· 000
· 0149
.0299
PSIG
Temp.
Corr.
3973
6654
7348
.0276 5101 .1355 3925 .0448 7647
.0374 5109 .1797 3945 .0597 7826
· 0473 5119 .2238 3960 .0747 7953
5124
.0896
· 1045
.1194
· 1344
· 14"95
8044
8120
8183
8237
3973
· 2680
.0571
.0670
5129
8278
· 1991 8266
.2488 8263
·2986
.3483
.4030
8261
8261
8259
e No. 8258 Depth 11244' Clock No. 1039z
o000 5094
°008 5146
.0183 5072
· 000
.137
Interval
REMARKS:
5106 .
8281
.000
.4O4
5114
5119
72 hour
3798
.000
.0475~
.0920
· 1365
· 1810
.2255
3847
3884
o000
.0152
.0303
3954
6517
6564
.0284 5081 3906 .0455 7635
.0386 5091 3926 .0606 7819
.0487 5099 3938 .0758 7949
°0589 5104 .2700 3954 ·0909
.0690 5106 .1061
.1212
.1364
· 1515
.2020
.2525
.3030
°3535
10 i 24090
44
* = 8 inutes '~ = 47 minutes
*** ='-Fir-s~-'~0-inter-v'~'l~-'~re-e~u-al to 15 minutes each; the'-fiext 4 inteYvals are e-q~ra~t~--50 minuLes
each; the last interval is equal to 55 minutes·
8046
8122
8186
8240
8286
8276
8274
8274
8264
8264
Minutes
SPECIAL PRESSURE
Drill Pipe or Tubing
Reversing Sub ......................
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly .......
Dual ClP Valve ...................
Dual CIP Sampler ..................
Hydro-Spring Tester ................
Multiple ClP Sampler ...............
4 1/2"
3.88"
3.88"
Extension Joint ....................
AP Running Case .................. 3.88"
Hydraulic Jar .................. 3.88"
VR Safety Joint
Pressure Equalizing Crossover .........
3.88'"
Packer Assembly ................... 5.70"
Per fora t ions
2.87"
Packer Assembly -
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case
Anchor Pipe Safety Joint ............
3.88"
3.88"
Packer Assembly .................. :
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor ..................
Drill Collars ......................
Flush Joint Anchor
Blanked-Off B.T. Running Case ........
Total Depth .......................
,o.. ,,,.,,_,,,,o ,, u...,. EQUIPMENT
I.D.
2.25"
3. 826"
2 1/4"
.88"
,62"
3"
1.25"
.75"
2.36"
2.48"
DATA
i i~1~1:: I I~U.~J 117U1
ii
LENGTH DEPTH
!
1499.52 '-9339,94 ' 3 73.58 '
6.33 ' 11208 '
5.95' 11214'
4,57' 11219'
5.08'
3.t9'
4.35' 11232'
8.66'
4.07 ' 11244'
1.05 ' 11249 '
11478' P.B.I
LITTLI['i g6~7~ 75C
TIME
Eac Horizontal Line Equal to 1000 p.s.i.
,_~ Ticket
FLUID sAMPLE DATA D0~e 11-15-75 N~,mb, r 817852
Sampler Pressure ~D.S.I.G. at Surface Kind Halliburton
Recovery: Cu. Ft. Ga, of Job HOOK WALL Distric,t KENA!
cc. Oil FiR. BUATiVlAN
cc. Water Tester HR. MANN Withe, MR. HARMON
cc. Mud Drilling
Tot. Liquid c~. Contractor BRINKERHOFF DRILLING COMPANY BC S
Gravity ° APl @ °F. E QU I PMENT & HOLE DATA
Gas/Oil Ratio cu. ft./bbl. Formation Tested
RESISTIVITY CHLORIDE Elevation Ft.
CONTENT
Net Productive Interval 165 m Ft.
Recovery Water __ @__ °F. ppm All Depths Measured From KellY Bush1 ng
Recovery Mud @__ *F. ~__ppm Total Depth 10806 m Ft.
Recovery Mud 'Filtrate __ @ ~°F. ppm Main Hole/Casing Size 7"
Mud Pit Sample @ °F. ppm Drill Collar Length 342' I.D2.~)5' - 2.764"
Mud Pit Sample Filtrate @ °F.~ ppm Drill Pipe Length8743' LD. 3.826"
Packer Depth(s) 10640 m Ft.
Mud Weight 14.6 vis cp Depth Tester Valve 10675 ' Ft.
TYPE AMOUNT Depth Back Surface Bottom
C, sh~on KCL 83 BBLS. 6740' Ft. Pres. Vo*ve Choke 3/4" Choke .62"
·
..
Recovered 6740' Feetof KCL water cushion ~
·
R~O.,Yered F~et of Formation water .- , ~
R~Vered Feet of 'i-. ~
Recovered Feet of - ~
Recovered Feet of ' '" "
Rem~r~., See production test data sheet...
.
,
·
. . . ~ . .
· . · .~
.
·
.
·
.. .
·
.*%
-'
· ' Gauge No. 1 781 Gauge No. ] 526 Gauge ~.
De~t~: 10631' Ft. De~t~: 10656' ~t. ~,pt~." Ft.
72 HourClock 72 HourClock HourCIock Toolll-]5-75A.M~
Est. °F. Blanked Off r~) Blanked Off Yes Blanked Off Opened ~: 30 P.M.
10657' Opened 11 - 16 A.M.
^ctua~ 182 'F. Pres,utes Pr~ures . Pr~ures Bypass 1~; 44 P.M.
Field Office Field Office Field Office Rel~orted Computed
Initial Hydrostatic 8403 8361 8438 8401 - ~,ut., ~,.~..
-t FI~ Initial 3777 3753. 3903 3913
.%. Fi.o~ 4720 4738 4'742 4748 879 876
Closed in 7456 7460 7468 7478 21 5 218
)) '"itia'
Flow ·Final
Closed in
Initial
~_~ Flow
~.~ Final -
Closed in
--
Final Hydrostatic 8368 8221 8404 8244
FOR# III.RI--II'RIHTEO IN U.S.A.
FORMATION TEST DATA
10686-10700'
Casing perfs. 10704-10728' Bottom choke ? 62~', Surf. temp. 0 °F Ticket No. 81 7852
Gas gravity Oil gravity GaR
Spec. gravity .Chlorides ppm Res ....... @ 'F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
i, ,
Date 11 -15- 5Choke Surface Gas Liquid
Time a.m.l Size Pressure Rate Rote Remarks
p.m. psi MCF BPD
8' 30 Opened tool
Bubble Hose
10'12 ¼" 32# ir 5 gallon btcket Water cushion to surface
10- 20 3/8" 35 Changed choke
11 '00 3/4" 55 Changed choke
11_16_75
2:30 3/4" 14 Gas and water to surface
11'09 3/4" 9 Closed tool
Reversed
14:44 0 0 Pulled loose
.,
,o,,. .... ,,_,.,,,.,.,,,,,u...,,. PRODUCTION TEST DATA
Drill Pipe or Tubtng ................
Reversing Sub ...................... 5"
I, Do
2.25"
Water Cushion Valve ................
Drill Pipe .' .......................
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve ...................
Dual CIP Sampler ..................
Hydro-Spring Tester ................
4½"
4.75"
3.826"
2.25" - 2. 764"
TICKET NO.
LENGTH
Multiple CIP Sampler ...............
Extension Joint ....................
AP Running Case .................. 3.88"
81 185Z
DEPTH
Hydraulic Jar .................. 3 ' 88''
VR Safety Joint ......... 3. 8 8 ' '
Pressure Equalizing Crossover ............
Packer Assembly ................... 5.70"
1' 10515'
874 3 '
342'
3.88" .88" 7.16 ' 10586'
4, 75" 2.25" 34.03'
3.88" .62" 6.29' 1 0625 '
11
1 , 25"
, 75"
2.36"
4.59' 10631 '
5.10'
3.22'
(1.04)
3.68' (2.64) 10640'
Distributor ........................
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube '
2.87"
Blanked-Off B.T. Running Case ....... 3.88"
HT-500 Temp. Recorder 3.88"
Drill Collars ......................
Anchor Pipe Safety Joint ............ '
2.48"
9.34'
4.07'
.98'
10656'
Packer Assembly ....................
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ..... : ......
Side Wall Anchor .................
Drill Collars ......................
Flush Joint Anchor ·
Blanked-Off B.T. Running Case ........
Total Depth .......................
FORM 197-RI--PRINT£D IN U.S.A.
EQUIPMENT DATA
10806'
/ .,
LITTLE'S 96676 7~C~/ 74
~._.~.~e No. 1781
First
Flow Period
Time Deft. PSIG
Temp.
.000" Corr.
Depth
10631'
Second
Flow Period
Time Deft.
.000"
PSIG
Temp.
Corr.
.0000 3753
.0841 4797*
.1947 5021'
.3053 5oO0
.4159 47'59
First
Closed In'Pressure
.~ PSIG
Time Deft. 'Log Temp.
.000" Cam
.0000 .- 4738
.0220 6621'*
.0418 6874.
.0617 7035
.0815 7140
7228
.1211 7295
7351 ,
1607 7400
73_8_2
7428
7460
.5265 4748
4752
Clock No. 10z~31
Second
Closed In Pressure
._~ PSIG
Time Deft. Log Temp.
.000" Corr.
ITicket
72 hour No.
Third
Flor Period
Time Deft.
.000"
PSIG
Temp.
Corr.
817852
Third
Closed In Pressure
Time Defl. kog-~-~
.000".
/
PSIG
Temp.
Corr.
e No. Depth
· 3913 .
.085 4805* .02 55
.0425
· 19 5047 .062
.309z 5024 .0828
· 421 4775 .1030
Interval
REMARKS:
4765 .1231
4772 .1433
.7571 4765 .1634
· 4755 .1836
· 4748 .2037
.2238
.2440
]8
*Interval = 76 minutes
6899
7060
7167
7247
7318
7375
7418
7331
7401
7441
7478
Clock No. 10394
**Interval = 20 minutes
C = Choke. Change
~2 hour
Minutes
SPECIAL '-'RESSU'"'"' .... , .....
r'- rK, I:. L,~/.~ ,, .~..
I:~,rh Hnri?nntcsl Line Eaual to 1 000 r~.s.i.
62" 250°F Ticket No. 817709
Casing perfs... Bottom choke · ,,, Surf. temp ,
Gas gravity Oil gravity m ~R
Spec. gravity. Chlorides ppm Res. @ 'F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
Date
Choke Surface Gas Liquid
Time a.m, Size Pressure Rate Rate Remarks
p.m. psi MCF BPD
12-54 Opened tools with a light bubble hose
blow ~ )
2254 Closed tool - rotated l l turns. Had
a very light blow on ¼" bubble hose il
a 5 gallon bucket.
11~21-75
0400 Pul 1 ed 1 oose...
,,,
i i ii.
PRODUCTION TEST DATA
le No. 1781
First
Flow Period
Depth
First
Closed In Pressure
Time Deft. PSIG Time Deft.
.000" Temp,
Corr. .000'
.000 2387 .000
.0678 241 .0277
· 1 345 UTR . 0499
· 2012 2934 .0720
.2679 3105 .0942
· 3346 3226 .1164
· 4013 3380 .1385
· 4679 3540 . 1607
.6680 3937 .2272
Gauge No.
· 000
.0688
LogZ
PSIG
Temp,
Corr.
393-7
'-G~-I 4'*
6537
6747
7'01-4
7105
7182
10,629'
Second
Flow Period
Time Defl.
.000"
.1365
.2042
.2719
.3396
6! .4072
7 .4749
_~8 .5426
9 .6103
]o .6780
'11
13
la
Reading I nter¥ol
REMARKS:
PSIG
Temp,
Corr.
Clock No.
10431
Second
Closed In Pressure
Time Defl.
.000"
PSIG
Temp,
Corr.
Ticket
72 hour No.
Third
Flow Period
Time Deft.
.000"
PSIG
Temp.
Corr,
817709
Third
Closed In Pressure
Time Deft. Log-~
.000"
PSIG
Temp,
Corr,
· 5346 3683 .1829 7249
.6013 3812 .2050 7309
· 2493
7358
7368T)
.3158
2133
2418~
.2715 - ~
.2937 -
I
· 3380 -
1526 Depth 10,655' Clock No. 10394 hour 72
3950
6259**
· ** INTERVAL:
· 000
.0282
2660 .0508 6579
2987 .0733 6781
3107 .0959 6933
3245 .1184 7047
3389 . 1410 7140
3547 .1635 7217
3695 .1861 7284
7338
7385T)
3826
· 2087
(. 2300
.2312
3950
60
.2538
25 MINUTES. T : READ Al IHE END OF 2
.2763
.2989 -
.3215
t3.9 MINUJES PRIOR
.3440 20 -
* INTERVAL : 61 MINUiE.~
Minutes
TO TOOL_HOVEMENT..-
UTR = UNABLE "TO 'READ·.
SPECIAL PRESSURE DATA
Drill Pipe or Tubing ................
Reversing Sub ......................
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve ...................
Dual CIP Sampler ..................
Hydro-Spring Tester ................
Multiple CIP Sampler ...............
Extension Joint ....................
AP Running Case ..................
Hydraulic Jar ....................
VR Safety Joint ...............
Pressure Equalizing' Crossover .........
Packer Assembly ...................
Distributor ........................
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case .......
Drill Co.ors ..... HT.-500.. T. EM .17..
Anchor Pipe Safety Joint ............
Packer Assembly ...................
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor .................
Drill Collars ......................
Flush Joint Anchor '
Blanked-Off B.T, Running Case ........
Total Depth .......................
h D.
5" 2.25"
4½" 3.826"
4.75? 2.25'"
3.88" .88"
4.75" 2.25"
3.88" .62"
3.88" 3.00"
3.88 1.25"
3.88" .75"
5.70" 2.36"
2.87" 2.48"
3.88"
3.88"
LENGTH
,,I / / '" ,:
1.00'
10,246. "'
373.58'
7.16'
34.03'
6.29'
4.59'
5.10'
3.22'
3.68'
9.34'
4.07'
.98'
TOTAL DEPTH
DEPTH
10513.59'
10,584.40'
10,624
10,629'
10,643'
10,655'
10,659'
10,761'
EQUIPMENT DATA
LITTL£'$ 96676 75C 6/14
' ' Ticket
F L U I D S A M P L E D A T A Date 11 -20-75 Number 817709
--
Sampler Pressure .P.S.I.G. at Surface Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE
cc. on H. MANN &
cc. Water Tester C. BOATMAN Witness RE NER
cc. Mud Drilling
Tot. Liquidcc. Contractor BRINKERHOFF DRILLING COMPANY NM S
Gravity ° APl @ °F. EQ U I PM E N T & H O L E DATA
Gas/Oil Ratio cu. ft./bbl. Formation Tested -
RESISTIVITY CHLORIDE Elevation 15 m Ft.
CONTENT
Net Productive Interval 118 ' Ft.
, ,
Recovery Water @ °F. ppm All Depths Measured From Kelly Bushing
Recovery Mud @~°F. ppm Total Depth 10,761'
Ft.
Recovery Mud Filtrate ~ @ ~°F. ppm Main Hole/Casing Size 7"
Mud Pit Sample @ °F. ppm Drill Collar Length 373 58 mI.D. 2.25"
Mud Pit Sample Filtrate~@~°F. ppm Drill Pipe Length 10,246~1.D. 3,826"
Packer Depth(s) 10,643 ' Ft.
Mud Weight 13.7 vis - cp Depth Tester Valve 1 0 ~ 624' , Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cushion KCL 52.6 barrels 5000' Ft. Pres. Valve NONE Choke NONE Choke .62"
Recovered 5000' Feetof water cushion (KCL)
Recovered 3811 ' Feetof rat hole and formation water - gas cut
Recovered Feet of
RecoVered Feet of
Recovered Feet of
Remarks Opened tool with 5000' of water cushion with a light ¼" bubble hose
blow which lasted for the duration of the test. Closed tools and reversed out
52.6 ,barrels of water cushion - 4.37 barrels of rat hole mud - 31.1 barrels of
formation water and gas Pulled tools loose. * ONLY 203.9 MINUTES SEGMENTED
PRIOR TO TOOL MOVEMENT... CHARTS INDICATE PARTIAL PLUGGING DURING FLOW PERIOD.
Gauge No. 1781 Gauge No. 1526 Gauge No.
TEMPERATURE TIME
Depth: 10,629 IF.t. Depth: 10 ~ 6551 Ft. Depth: Ft.
72 Hour Clock 72 Hour Clock Hour Clock Tool I I -TU-/A~.M.
Est. °F. BIc~nkedoff NO BlankedC~f YES BlankedOff Opened 1254 P.M.
10,660, @ .... OpenedJ I-YI-/~.M.
Actual18~'F. Pressures ,.. Pressures Pressures Bypass 0400 P.M.
Field Office Field Office Field Office Reported Computed
Initial Hydrostatic 7666 /64~! 766~ 7662! M~,ute, Minutes
Initial 2349 2387 I 2323 2~33
'-~o Flow
Final 3916 3937 39~6 39S0 600 bU~
Closed in 7386 7368* 7368 7385* 306 305
~'o~ Initial
c o Flow ...
~. Final
Closed in
Initial
~ Flow .....
,
~_~. .... Final
Closed in
~"Fir~'M Hydrostatic J /701 7719 7702 7753 ','
I
~ORM I$1-RI--pRINT£D IN U.S.A.
FORMATION TEST DATA
LITTLE'$ 9667!
IJJ
TIME
,-__L. ~-,-;~,~,~tnl I_ine Eaual to 1000 p.s.i.
Ticket
FLU I D SAM P L E DATA
Sampler Pressure .P.S.I.G. at Surface Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL District AHCHORAGE
cc. Oil
cc. Water Tester MR. BOATMAN Witness MR. REINER
MR. r, iANN
cc. Mud Drilling
Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY BC
Gravity ° APl @ °F. E Q U I P M E N T & H 0 L E D^ T A
Gas/Oil Ratio cu. ft./bbl. Formation Tested
RESISTIVITY CHLORIDE Elevation 1 5
CONTENT Ft,_
Net Productive Interval Ft.
Recovery Water @ °F. ppm All Depths Measured From Kal ly Bushing
Recovery Mud ~ @~ °F. ppm Total Depth Ft
Recovery Mud Filtrate __ @~°F. ppm Main Hole/Casing Size 7n
Mud Pit Sample @ °F. ppm Drill Collar Length I.D.
Mud Pit Sample Filtrate~ @ °F. ppm Drill Pipe Length I.D.
Packer Depth(s) Ft.
Mud Weight vis cp Depth Tester Valve Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cushion Ft. Pres. Valve Choke Choke
Recovered Feet of
'.
Recovered F&et of
Recovered Feet of
Recovered Feet of
Recovered Feet of
Remarks PRESUHED COMMUNICATION BETWEEN TOP PERFORATIONS AND BOTTOM PERFORATIONS.
PACKER WAS SET BETWEEN PERFORATIONS. TEST WAS ABORTED. CEHENT SCALE PASSING BY
IHPACT SUB SHEARED REVERSING PIN AND FLUID EQUALIZED.
NOTE' No formation test data sheet supplied with charts from this test. No depths
~ reported.
Gauge No. 1 781 Gauge No. 1526 Gauge No.
TEMPERATURE TIME
_ Depth: - Ft. Depth: - Ft. Depth: Ft. ,,
7? Hour Clock 72 Hour Clock Hour Clock Tool A.M.
Est. °F, Blanked Off - Blanked Off- Blanked Off Opened P.M.
'2 '2 '2.2 Opened A.M.
_Actual 1 79 'F. Pressures Pressures Pre~ures Bypass P,M.
Field Office Field Office Field Office Reported Computed
nitial. Hydrostatic 7488 7528 ' Minutes Minutes
.~ Initial I
'; o Flow F~nal
[ ~'' ClosedinI I
/~. Initial
/~ 6 Flow ,,, F~n
~ Closed in t
I_.a Initial
J~ o Flow ,-. ,
j' C'os-d in ! I ,,
?~[-~'in°l Hydrostatic J, 7488 j 7528, J. J
' : ~.~,' ~B~-RI--FNINTED IN U,S.A.
FORMATION TEST DATA
LITTLE'G ~71 I~'~M IJ,Z74
I.U
Each Horizontal Line Equal to 1 000 p.s.i.
FLU I D SAMPLE DATA Ticket .~
Do~e 11-23-75 Number 817853 B ,
~ ,~--. ....
Sampler Pressure .P.S.I.GJ at Surface Kind Halliburton .,
Recovery: Cu. Ft. Gas of Job HOOK WALL TEST District ANCHORAGE
cc. oi~ MR. MANN
cc. Water Tester MR. BOATMAN Witness MR. RE INER
cc. Mud Drilling
Tot. Liquid cc. Contractod)RINKERHOFF DRILLING COMPANY PW
Gravity ° APl @ °F. E Q U I P M E N T & H O L E D A T A
Gas/Oil Ratio cu. ft./bbl. Formation Tested
RESiSTiVITY CHLOmDE Elevation 1 5" Ft.
CONTENT ......
Net Productive Interval Ft.
Recovery Water ~ @~ °F. ppm All Depths Measured From Kelly Bushing
Recovery Mud @ °F. ppm Total Depth Ft.
Recovery Mud Filtrate ~ @ ~°F. ppm Main Hole/Casing Size 7"
, ,
Mud Pit Sample @ °F. ppm Drill Collar Length I.D,
....
Mud Pit Sample Filtrate~ @~°F. ppm Drill Pipe Length I.D.
Packer Depth(s) .Ft.
Mud Weight vis ..... cp D,epth Test.er Valve .....
TYPE AMOUNT Depth Back Surface Bottom
Cushion Ft. Pres. Valve Choke Choke
.........
Recovered Feetof NOTE- No formation test data sheet supplied with char..t~
Recovered Feetof .from this test. No depths reported, ...
Recovered Feet of ' ~.. ·
Recovered Feet of m m ..... '
Recovered Feet of ;' ii'i! i: i~'i ~
.
Remarks Packer was set above both sets of perforatio, ns. Test was aborted - ,,,
cement scale passing bo/ Impact Sub Sheared reversing p~n and fluid
equalized. ~ ·
"
..........
'Gouge h~>. 1 781' Gauge No. 11~26 ....... Gauge NO. , ........
TEMPERATURE TIME
Depth: ..... F.t. Depth: _, Ft. Depth: Ft.
7LNo, r ,Clock 72 Hour Clock Hour Clock T~ol mn A.i~
_Est. °F. EBlanked Off .. Blo, n, ked ~f mm' Blanked Off ,, Opene~ II P.M.
Opened A.M.
.
_ Actual ] 7~F. ,. Pressures , Pressures Pressures , Bypass P.M.
Field I Office Field Office Field Office I~el:)°rted C~mputed
Initial Hydrostatic 7351 7401 Minutes Minutes
Initial ~
~.: Flow __ · '
,;;-~ , Final
Closed in
'~o Flow , Initial ' ' ·
ou~ "Final "
Closed in "
Initial "
~ Flow .....
c ~ Final '
Clos~.d in ............... o ....
:Final Hydrostatic 7540 ' 7558 .....
FORMATION
TEST DATA
LIT'TLE'I ~1171 IO# e/74
FLU ID SAMPLE DATA ,~_ , Ticket
Date 11-24-75 Number 817853 C
Sampler Pressure .P.S.I.G. at Surface :Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE
CC. Oil MR. BOATMAN
cc. Water Tester MR. ~A~N~ Witness ~. REINER
cc. Mud Drilling
Tot. Liquid cc. Contractor BRT~.E~OFF DRILLTNG CC)~'[PA[~J~' B~T S
Gravity ° APl @ °F. EQ U I PM E N T & H O L E DA TA
Gas/Oil Ratio cu. ft./bbl. Formation Tested
RESISTIVITY CHLORIDE Elevation 15 ~ Ft.
CONTENT
Net Productive Interval 96" Ft.
Recovery Water @ °F. ppm All Depths Measured From Kelly Bushing
Recovery Mud ~ @ ~ °F. ppm Total Depth 10678 ~,, Ft.
Recovery Mud Filtrate ~ @ ~ ·F. ppm Main Hole/Casing Size 7
Mud Pit Sample @ °F. ppm Drill Collar Length 373' I.D. 2.25"
,,
Mud Pit Sample Filtrate~ @ °F. ppm Drill Pipe Length 10178' I.D. 3.826"
Packer Depth(s) 10582" Ft.
Mud Weight 13 7 vis cp Depth ,Tester Valve J. 0561
...... · ..... FI'.
TYPE AMOUNT Depth Back Surface Bottom
Cushion KC[, WATER 5000 ~ Ft. Pres. Valve Choke 3/8
..
·
·
Recovered 5000' Feetof formation water and gas. ..
·
Recovered Feet of
Recovered Feet of
Recovered Feet of
Recovered Feet of
Remarks Set tools open to flow for 743 minutes with 6 barrels per hour rate with
small amount of gas. Closed in and reversed out formation fluids and gas.
..
SEE PRODUCTION TEST DATA SHEET FOR ADDITIONAL INFORMATION.
'"Gauge No. 1781 Gauge No. 1526 Gauge No. ' '
TEMPERATURE TIME
Depth: 10568 '
- ., Ft. Depth: 10593 '
Ft. Depth: Ft.
72 Hour Clock 72 Hour Clock Hour Clock ~
,,
Est. °F. Blanked O~f NO Blanked ~f YES Blanked Off Opened 0854 P.M.
"' 1059~ ' .....
Opened 1 i' 24- ?ksM~
__Actual 182 °F. Pressures Pressures Pressures Bypass 0325 P.M.
,,, ,,, ,
Field Office Field Office Field Office Reported COmpUted
Initial Hydrostatic 6965 7330 7334 7341' Minutes Minutes
--
· -~o1~.c Flow Initial 2871 2425 I 242-4~ 2394
,~ Fina~ 4825 4857 · 4809 4862 745 743
Closed in '7596 7635 7635 7645 366 369
~= Initial ' '
c o Flow ,
~u°'D' l l'Fina[
Closed in
-- initial
!~o Flow
~: ~ Final
Closed in .....
_Final Hydrostatic 7386 7491 7468 7498
-- ,, .,, .,, ,~ .,, ~ ,
LITTLIr'$ 9eETI 1OM S/74 ~
FORMATION TEST DATA
10618"'- 10620' ...........
Cosing perfs. 10648 ' - 10668 ' '- 3°
.... Bottom choke .62 Surf. temp .... 'F Ticket No 817853 C
Gas gravity. Oil gravity , GOR
Spec. gravity.,, Chloride~ ppm Res, .@ 'F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
,, ,
Date
Choke Surface Gas Liquid
Time a.m, Size Pressure Rate Rate Remarks
p.m. , psi MCF BPD
11-23-75i
0854
1715 3/8" 0 Water cushion to surface
,,
2119 Closed and reversed 55 turns.
11-24-75 Formation water and gas returned.
0325 Pulled loose.
,
,
,, ,
,,,
FORM *,S2-R1--PRINTEO IN U.S.A,
PRODUCTION TEST DATA
LITTLE'$ 96672 5M 8/74
;
, ,,,
Gouge No. 1781
First
Flow Period
Time Dell. PSIG Time Deft,
.000" Temp.
Corr, .000"
o0000 2425 --.-'0'0-06
o 1426 3324* .0213
o 279 7 3 930- ..... -~-0~-~j-~
.4168 4437 .0772
.5539 4867 .1052
4874 .1332
4857 .1612
· 1891
.2171
· 2451
.2731
.3011
.3290
.3570
.3850
.4130
°6909
.8280
J Depth
First
Closed In Pressure
Log-~
PSIG
Temp.
Corr.
4857
6396~
6786
6986
7116
7214
7288
7351
7404
7449
7491
7523
7554
10568'
Second
Flow Period
Time Dell. PSIG
Temp.
.000" Corr.
Clock No. 10394
Second
Closed In Pressure
Time Defl. Log-~
.000"
PSIG
Temp.
Corr.
I Ticket
72 hour No. 817853
Third
Flow Period
Time Defl.
.000"
PSIG
Temp.
Corr,
Third
Closed In Pressure
Time Deft. Log-~
.000"
PSIG
Temp.
Corr.
7586
7611
7635
No. 1526 Depth 10593' Clock No. 10431 72 hour
.0000 4862
o1444 3332* .0214
.2831 3936 .0496
o4218 4443 .0778
· 5606 4876 . 1060
o 6993 4879 . 1341
6444.
6822
7013
7137
7231
7304
7368
7418
7465
7502
7538
7569
7595
7622
7645
25
= 128 MINbTES -~-* INTERVAL = 19 MINUTES
°8380 4862 .1623
· 1905
.2187
.2469
02750
.3032
.3314
.3596
·3878
o4160
Interval 123
REMARKS: * INTERVAL
Minutes
FORM 18'1 ...... ,NI'I='D INU.$.A. SPECIAL PRESSURE: DATA
Drill Pipe or Tubing ................
Reversing Sub ......................
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve ...................
Dual CIP Sampler ..................
Hydro-Spring Tester ................
Multiple CIP Sampler ...............
Extension Joint ....................
AP Running Case ..................
Hydraulic Jar ....................
VR Safety Joint -
·
Pressure Equalizing Crossover .........
Packer Assembly ...................
O. D,
4.50" '
4.75"
3.88"
4.75"
3.88"
3.88"
3.88"
3.88"
5.70"
2.87"
Distributor
·
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case ....... 3 o 88"
~~~ .. ItT. -5.0.0. T..EM~.. RE. CORDER 3.88"
Anchor Pipe Safety Joint ............ '
.
·
Packer Assembly ....................
Distributor .......................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor ..................
Drill Collars ......................
Flush Joint Anchor '
Blanked-Off B.T. Running Case
Total Depth .......................
I, Do
FICKEI" NO.
LENGTH
3.826"
2,25:
.88"
.50"
,62"
3.00"
1, 25"
.75"
2,36"
2,48"
.'
1017 ~ ...
373 '
7,16'
34.03 '
6.29'
4,59'
5.10'
3.22'
,,.
3.68'
9.34'
4,07'
.98'
~. I/tS53 C
,, ,
DEPTH
10520'
10561'
10568 '
10582 '
10593 '
10598'
10678 '
F L U I D S A M P L E D A T A Rte 1 ] ')':' Ticket
-,,O-~75 Number 817854 '
Sampler Pressure .P.S.I.G. at Surface 'Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE
cc. on .... MR,'"' MANN & "
cc. Water Tester MR, FREITAG Witness REINER
cc. Mud Drilling
Tot. Liquid cc. Contractor BRi[NKERHOFF DRILLING COMPANY NM
Gravity ° APl @__ __°F. ,,, EQU ! PM E N T & H O LE DA TA S
Gas/Oil Ratio cu. ft./bbl. Formation Tested -
RESISTIVITY CHLORIDE Elevation 'J '5 ~' Ft.
CONTENT
Net Productive Interval 8090' - 8109' Ft.
Recovery Water @ CF. ppm All Depths Measured From Kal ly Busi~i ng
Recovery Mud ~ @-- °F. ppm Total Depth 9443'
Ft.
Recovery Mud Filtrate ~@ ~°F. ppm Main Hole/Casing Size 9 5/8" ......
Mud Pit Sample -- ~ -- °F. ppm Drill Collar Length 62.52 I.D. 2.25"
Mud Pit Sample Filtrate~ @ °F. ppm Drill .Pipe Length - I.D.
Packer Depth(s)8057'
,Ft.
Mud Weight 12· 2 vis ~., - cp Depth Tester Valve ~. ~,,,, .Ft.
TYPE AMOUNT Depth Bock Surface Bottom
Cushion KCL 71.1 barrelsFt. Pres. Valve NONE Choke NONE Choke .62"
~ ,,
5000, ,,
RecoVered Feet of .... .~ ~.
Recovered Feet of REVERSED OUT .... _,.
Recovered Feet of,
Recovered Feet of
Recovered Feet of
Remarks SEE PRODUCTION TEST DATA SHEET...
,,
Gauge No. 2859 Gauge No. 2858 Gauge No.
TEMPERATURE TIME
Depth: 8045 ' Ft. Depth: 8070' Ft. Depth: Ft. --I
72Hour Clock 72 Hour Clock Hour Clock Tool A.M. c::::
_Est. °F., Blanked Off NO Bla. nked Off yI~.S Blanked Off Opened 03' 03 ,,P,.M:,.
8071' @ Opened A.M.
~Actuol 1 ~.C~°F. Pressures Pressures Pressures Bypass08,40P.M.
, ,
Field Office Field Office Field Office Reported Catapulted
,,
-Initial Hydrostatic 5485 5425 5471 5405 Minutes Minutes
--~o FI0w Initial" 2473 2464 2462 2450 '~
~.:
,-:- ~. Final 2623 2633 2609 2622 - I bi
Closed in 4142 41.50 4138 4156 ' i 86
_
'o-~ ' "lni'Hal' ' '
_, Closed in .........
Initial
.~] I:~ .....
~. , Final ..........
Closed in
Pi----'-nol Hydrostatic 4485 53'30 ' 4632 5356
_
fORM I~I-RI--pRINTI~O IN U,$.A,
FORMATION TEST DATA
Casino perf'090' - 8,109' Bottom choke ............ Surf. tem~n 20'F Ticket No. 817854
Gas gravity. Oil gravity. GOR ......
Spec. gravity. Chloride~ , .. ppm Res,
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED ........
, ,,
Date
Choke Surface Gas Liquid
Time a.m. Size PreSSure Rate Rate Remarks
o.m. psi MCF BPD
11-26-75
0303 Opened tools with a light blow on ~"
bubble hose in a 5 gallon bucke~,
0730 Closed tool with a light blow ~,. droppe~
bar to reverse.
0750 Bar failed to shear pin.
0800 Rotated dual closed in pressure valve tt
·
reverse and condition the mud
0840 Pulled tool loose and pulled out of the
hole. ,
..
.i
,
..
. .,
.........
·
,,, i i · i i i m
PRODUCTION TEST DATA
First
Flow Period
Time Dell. PSIG
Temp.
.000" Corr.
· 000 2464
,I,Depth ......
First
Closed In Pressure
Time Deft. Log-~
.000"
2859
· 000
.0343 2489* .0047
.0675 2519 .0210
· 1006 2556 .0373
.1338 2599 .0537
3092ASl .0700
· 1670 2633 .0863
· 1027
.11
.1353
'.1517
PSIG
Temp.
Corr.
2633
2870**
3316
3550
3711
3808
3893
3953
4000
4035
4072
4O97
4125
4137
4150
Clock No. 10431
PSiG '
Temp.
Corr.
72 houri
, i
Log~--~
Temp.
Corr.
· 1680
· 1843
·2007
8045'
, ,,
Second
Flow Period
Time Dell. PSIG
Temp.
'000°° Corr.
Second
Clo, sed In P,ress, ure
Time Deft. Log-~
.000"
,,,
Ticket
No.
Third
........ · , Fiow P.eriod
Time Deft. PSIG
Temp.
.000" Corr.
Third
Closed In Pressure
Time Deft.
.000'
e No. 2858
.0359 2479* .0046
.0707 2511
·
.1055 2548 0372
· 1402 2587 .0534
3084AS
· 1750 2622
3O
Depth
2622
2924**:
3336
3551
3714
· 0697 3822
· 0859 3899
· 1022 3958
14
.1185
.1347
·1510
.1672
.1997
.2160
4002
4040
4072
4099
4128
4141
4156
8070' Clock No. 10394 hour 72
* INTERVAL : 31 MINUTES· ** '~NTERVAL : 4 MI~ JTE~". ' ASC = APPARENT ~[JRFA~E CLOSURE.
Ntinutes
Interval
~ RE~RKS:
,I
--
FORM leI-RI~IIRINI'~D IN
SPECIAL PRESSURE DATA
i
817854
Drill Pipe or Tubing ................
Reversing Sub .......................
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly, ......
Duel CIP Valve ..................
D~ Sampler ..................
Hydro-Spring Tester ................
0P.E.N.B.Y.P.f. SS
Extension Joint ...................
AP Running Case .................
Hydraulic Jar .................
VR Safety Joint ...............
Pressure Equalizing Crossover .........
Packer Assembly ..................
5,00"
4,75"
5.00"
5,00"
5.00'
5,00"
5.00"
5,00"
8. lO"
2.88"
3,88"
3.88"
Distributor ........................
~T,,IC K ET NO.
LENGTN
DEPTH
2,2~"
1 · 00"
,87"
3,75"
.8?"
1.00"
1.62"
2.259"
"1"'~ 00' '
62.5Z' ·
4.87'
' 3Z~. 49 '"
5.31 '
3.18'
7,15'
4,14'
5.09'
3.03'
4.62'
8.67'
3.99'
1.00'
7920'
7989'
7994'
8029:
8045'
8057'
8070'
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case .......
c~] &c~&H.T.-. §0.0..TEMP.. RE.C.O.R D E R
Anchor Pipe Safety Joint ............
Packer Assembly ...................
Distributor ........................
Pecker Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor ..................
Drill Collars ................. ' .....
Flush Joint Anchor ..................
Blanked-Off B.T. Running Case ........
Total Depth '
FORM I~7-RI--PRINTED IN
EQUIPMENT DATA
9443'
LITTLE'Ii
TIME
Ticket
FLUID S^MPL£ D,~._?^~ ' ~ot~ 11-27-75
~mpler Pressure .P.S.I.G. at Surface Kind Halliburton
~co~w: Cu. Ft. ~s of~ob HOOK HALL Di~t,ict ANCHO~GE
cc. Oil
cc. Water T~ter MR, FREITAG Witness MR, REINER
....
cc, Mud Drilling
· ot. uq~iUcc, co~t~o:to~ BRINKERHOFF DRILLING COMPANY DR
Grovi~ ' APl ~ ~F, E~ U I P~ E N T & H O L E DA TA
Gas/Oil Ratio cu, ft,/bbl, Formation Tested -
RESISTIVITY CHLORIDE Elevation 1 ~ ~ Pt,
COMTENT .....
Met Pr~uctive Interval 80g0-810g ' Ft.
Recovery Water ~__ 'F, ppm All Depths ~msured From Kal 1 v Bu~hi no
Recove~ ~ud ~~~F. ppm Total Depth ' g443' Ft,
Recove~ ~ud Filtrate ~ ~~~F, ppm ~oin Hole/Casing Size g 5/8" Casino
~d Pit SamCe ~ oF. ppm Drm Co~ar ke. ath 62.~2' LD[ 2 25"
~ud Pit Sample Filtrate~ ~__OF. ppm Drill Pipe Length - I,D, -
Packer Depth(s) 8057 ~ .,Ft,
~ya ~i~t 12.2 , vis :p Depth Tinter Valve
~PE ~OUNT Dep~ Bock Surface Bottom
cumio. .~t. Pres. W~e C~o~ 3/4" Choke 5/8"
'.
~ecovered Feet of Rever~d out
.
Recovered Feet of
Recovered Feet of
Recovered Feet of
Recovered Feet of
Remor~ Onened tnol for ~O minute first flnw. Closed tool for 156 minute first
closed in pressure. Reopened, tool for 38 minute second flow. Closed tool for 191
minute second closed in pressure. CHARTS INDICATE PARTIAL PLUGGING OF TAIL PIPE
P~RFORATIONS DURING FLOW PERIODS. TIMES REPORTED AND TIMES RE~ORDED DO NOT AGREe.
~UaeNo. 2859 GauaeNo. 2858' ~ae~o. " ' '
T~PE~TURE TIME
Depth: 8045 Ft. Depth: 8070 ~t. ~epth: , Ft.
7~ H~rCl~k 7~ HourCIock HourCl~k T~I A.M.
~t. 'F. e~..k.d~fN6, m..k~f ye~., . m..k.dOff Ope,ed !6:28 P.M.
8071 ' Ope.ed A.M.
~ctual ] ~4 [,F. Pressures Pressures Pre~ures Bypass 12' 33 P.M.
Field Office Field Office Field Office Reported CompUted
Initial Hydrostatic ~2R7 ~2R~ R2Rq 5306
~ FI~ Initial?~1 I~R. ~ lq7 71~
~'~ I
~___ F~..~ 8n4 687 ~ RI~ 822 , R?? R?n
aO'ed ~. 2548 2499 2511 2518 63 156
~ ~.~t~o~ 854 745 987
8.~ Flow FinaI
~ _ 879 756 1233 1~90 t. 126 38
~__ C~°'ed~" 2997 3017 3027 303~ 19~ .,191
~ Flow Initial
.........
...... ~'oSed in " '
~i .... Hydrostatic J5237 5231 , 4805 5252
~ ~ · ,, ,,
FORMATION TEST DATA
G o__~..~.~9.~_~.c>. 2859
First
Flow Period
Time Dell PSIG
Temp.
.000" Corr.
First
Closed In Pressure
Time Deft. Log~--~
.000"
PSIG
TemD.
Corr.
804 5'
Second
Flow Period
Time Defl.
.000"
PSIG
TemD.
Corr.
745
Clock No. 10431
Second
Closed In Pressure
PSIG
Time Deft. Log Temp.
.000" Corr.
· 000 756
.0223 1622'
· 0435 1896
· 0647
.0859 2307
72 hour] N0:-
Third
Flow Period
Time Deft. PSIG
Temp.
.000" Corr.
817876
Third
Closed In Pressure
Time Dell, Log-~
.000"
PSIG
Temo.
Corr.
.1283 2616
· 1706 2852
e No.
REMARKS:
Depth
-------_ Clock No. 10__394
__1~225 16_88'
Minutes
FORM Ig3-RI~PRINTEJD IN U.S.A.
SPECIAL PRESSURE DATA
LITT~E:'$ g8873 7'c¢ 8/74
TICKET NO. 817876
Drill Pipe or Tubing ................
Reversing Sub ......................
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve ...................
Dual CIP Sampler ..................
Hydro-Spring Tester ................
Multiple CIP Sampler ...............
Extension Joint ....................
AP Running Case ..................
Hydraulic Jar ....................
VR Safety Joint ...............
Pressure Equalizing Crossover .........
Packer Assembly ...................
I.D. LENGTH DEPTH
5.00II
4.75"
5.00 ii
5.00"
5.00 '!
.87"
2.25II
1. 0011
.87II
3.75"
.87'1
1.00'1
1.62'
2.26"
1.00' 7920'
62.52'
4.87' 7989'
34.49" 7994 '
5.31 '" 8029'
5.00"
5.00"
5.00"
8.10"
2.88"
3.88"
3.88"
3.81' Lock open by pass
7.15'
4.14' 8045'
5.09'
3.03'
4.62'
8.67'
8057'
Distributor ........................
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ..........
Blanked-Off B.T. Running Case .......
Drill Collars ......................
Anchor Pipe Safety Joint ............
3.99' 8070'
1.00' HT-500 Temp. Device
Packer Assembly ...................
Distributor ........................
Packer Assembly ...................
Packer up 38.02"
Tail 16,53"
Total tools-54.55"
Anchor Pipe Safety Joint ............
Side Wall Anchor .................
Drill Collars ......................
Flush Joint Anchor ...................
Blanked-Off B.T. Running Case ........
Total Depth .......................
9443'
LITTLer'i B~16 71~C 1/14
EQUIPMENT DATA
l~acl~ Florizonta Line Eaua n ~
FLUID SAMPLE DATA Date 11-30-75 Number 817877 , -
Sampler Pressure .P.S.I.G. at Surface Kind Halliburton
Recovery: Cu. Ft. Gas of Job HOOK WALL District ANCHORAGE
cc. Oil
cc. Water Tester FREITAG Witness REINER
cc. Mud Drilling I
Tot. Liquid cc. Contractor BRINKERHOFF DRILLING COMPANY NM
Gravity ° APl @ °F. EQU I PM E N T & H O L E DATA S
Gas/Oil Ratio cu, ft./bbl. Formation Tested -
RESISTIVITY CHLORIDE Elevation 15" Ft
CONTENT
Net Productive Interval 6316' - 6919' Ft.
Recovery Water @ °F. ppm All Depths Measured From Ke] l~v Bushing
Recovery Mud @~ °F. ppm Total Depth 80] I ' Ft,
Recovery Mud Filtrate ~ @ ~°F. ppm Main Hole/Casing Size 9 5/8"
Mud Pit Sample @ °F. ppm Drill Collar Length93.80'I.D. 2.25"
Mud Pit Sample Filtrate~ @ °F. ppm Drill Pipe Length - I.D. -
Packer Depth(s) 6280 '
Ft.
Mud Weight 12.2 vis - cp Depth Tester Valve 6247' Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cushion NONE Ft. Pres. Valve NONE Choke 3/8"& 3/4" Choke 5/8"
....
·
·
Recovered Feet of REVERSED OUT...
·
Recovered Feet of ~ ~::
Recovered Feet of
Recovered Feet of
e
Recovered Feet of
Remarks SEE PRODUCTION TEST DATA SHEET...
CHARTS INDICATE PARTIAL PLUGGING DURING THE INITIAL FLOW PERIOD.
·
Gauge No. Gauge No. Gauge No.
TEMPERATURE 2859 2858 TIME -"1
_ Depth: t~?l~7I Ft. Depth: 6301' Ft. Depth: Ft. I
72~our Clock 72 Hour Clock Hour Clock Tool 11 - 29- 7 5,.M.
,,
_Est. °F. Blanked off , Nfl Blanked Off Yes Blanked Off Opened 16'4P.M.
6302' @ Opened 11-30-~. ·
~ctua~ 112°F. Pressures Pressures Pressures Bypass 1 1 '
Field Office Field Office Field Office Reported Computed
-initial Hydrostatic 4167 411 7 4187 4156 Minutes Minutes
--
'~o Flow Initial 251 276 t 247 331
'~._ Final 251 327 271 333 ~Ui L~U2
Closed in 2922 2955 2953 2956 514 b I Z
'~o Initial 251 304 247 333 r-
· ~'r' Flow Final 251 337 296 346 1 20 122
Closed in 2922 2945 2953 2948 1 90 189
~ Flow Initial
~. Final
Closed in
Final F'lydrostatic 3967 3985 3940 4002
~..
r c,w~ I~R1--PRINTIED IN
FORMATION TEST DATA
6316' - 6332' 6522'-65;~
Casing perfs, 6644' -6650- BOttom choke 5/8" 10 817877
, Surf. tamp *F Ticket No .....
Gas gra,ity. 6911 ' - 6919' Oi~ gravity GaR
Spec. gravity. Chlorides ppm Res. @ °F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
Date
Choke Surface Gas Liquid
Time a.m. Size Pressure Rate Rate Remurks
~.m. psi MCF BPD
16-42 Set tools.
16'45 Tool opened'with a strong blow througl
·
16'55 ¼" hose into a 5 gallon bucket.
17' 15 5 PSI
19'00 3/4" " Gas to the surface - small flare
20-32 10 PSI ' Closed on surface for sample°
.
..
20'50 3/4" Opened wel 1.
21-46 Shut well in.
11;30-75
06:20 3/4" 27 PSI Opened well to flare
08' 20 3/4" 0 PSI Shut well in.
08:22 Reversed out the test.
1 '1° 30 Pul 1 ed tool 1 oose.
·
.................. ,,,,.,.,,. PRODUCTION TEST DATA '"'"""'"'"'"'/"
I .
e ~o.
First
Flow Period
Time Deft. PSIG
Temp.
.0OO" Corr.
276
327
2859
I Depth
First
Closed In Pressure
Time Dell.
.000"
· 000
.0403
.3827
L t-t-8
· 4588
.5349
.5730
PS I G
Temp.
Corr.
327
1736"
2406
2751
2880
!2920
r2935
2943
2948
2950
2950
2950
2955
2955
2955
2955
6267'
Second
Flow Period
Time Defl.
.000"
.000
.0249
.0475'
.0701
.0928
'. 11 '54
· 1380
PSIG
3O4
'269**
334
'339
339'
'3'37
337
Clock No.
10431
Second
Closed in Pressure
L t-I-~
PSIG
Temp.
Corr.
337
445***
J
Ticket
72 hour, No.
Third
Flow Period
PSIG
Temp.
Corr.
Time Defl.
.000"
Time Defl.
.000"
· 000
.0224
Time Deft.
.000"
817877 , ,j
Third
C,,Io,s..ed In Pr.e..ssure .....
PSIG
Temp.
Corr.
.0460 1756
· 0696 2404
.0933 2716
.1169 2850
· 1405 2900
.1641 2923
.1877 2935
.2114 2940
2945
.2350
e No. 2858
· 000
· 340 333 .0406
.0789
PLUGGI .1172
.1555
JReodin~l Interval
REMARKS: * I
J ,
· 1938
.2322
.2705
· 3088
.3471
.3854
.4238
.4621
Depth
6301'
Clock No. 10394 hour 72
.000 346 I
.0203 1681
.0417 2324
2762 . .0631
2885 .0921 346 .0845
2926 .1
2941 .1370
2658
2826
· 1059 2885
346 . 1274 2916
2946 .1488 2929
2951 .1702 2939
2953 . 1916 2943
2956 .2130 2948
2956
2956
· 5004 2956
· 5387 2956
.5770 2956
34
Minutes
FORM 183-RI~PRINTED IN U.S.A.
LI??LI.'$ 96&73 75C: J/74
SPECIAL PRESSURE DATA
TICKET NO. 817817
Drill Pipe or Tubing
Reversing Sub ......................
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ......................
Handling Sub & Choke Assembly ......
Dual CIP Valve ~. ..................
Duel ClP Sampler ..................
Hydro-Spring Tester ................
LOCK-OPEN BYPASS
Multiple ClP Sampler ...............
Go Do
6.12"
Ia Do
3.00"
LENGTH
i .00:
DEPTH
6134'
Extension Joint ....................
4.75"
5.00"
4.75"
5.00"
5.00"
5.00"
AP Running Case .................. 5.00"
2.25"
.81"
2.25"
1.00"
.87"
3.75"
.87"
1.00"
1.62"
2.26"
62.52'
4.87:
34.49:
5.31 '
3.18'
7.15'
4.14'
5.09'
3.03'
4.62'
6203'
6208'
624/'
Hydraulic Jar ....................
6267'
VR Safety Joint .................
Pressure Equalizing Crossover .........
Packer Assembly ...................
Distributor ........................
8.10
2.88"
3.88"
3.88"
6280'
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ...........
Blanked-Off B.T. Running Case .......
-~w~:~.. H.T.-. 5.00..TEMP.. DEY. I.C. E
Anchor Pipe Safety Joint ............
Packer Assembly ...................
8.67'
3.99'
l .00'
6301 '
6302' ,
Distributor ........................
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor ..................
Drill Collars ......................
Flush Joint Anchor ..................
Blanked-Off B.T. Running Case ........
Total Depth .......................
8011'
FOHM I87-RI--PRINTI[D IN U.S.A.
EQUIPMENT DATA
LITTLE'$ D6675 75C 8/74
emoved Min. MCF/D
c Pressure ...................... Psig.
~ Final Flow Pressure ............................. Psig.
-- Potentiometric Surface (Fresh Water') ..................... Feet
-- Average Adjusted Production Rate During Test ................ bbls/day
~ Theoretical Production w/Damage Removed ................ bbls/day
-- Measured Gas Production Rate ............................ MCF/D
-- Corrected Recovery ................................. bbls
-- Temperature Rankine ..............................
-- Compressibility Factor ......................
-- Viscosity Gas or Liquid .........................
PF
Q
Q~
Qg
R
r ~, -- Radius of Well Bore .
t -- Flow Time ....
t o = Total Flow Time ..
T
Z
Log -- Common Log
............................... Feet
Minutes
..........................
.......... Minutes
...............
oR
CP
* Potentiometric Surface Referenze t-o ,Rotary T~ble When E!ew~f;on N.:s+ Given,
Fresh Weter Corrected to
F L U I D S A M P L E D A T A z: Dote 1 2-2-75 TicketNumber 81 7878
Sampler Pressure .P.S.I.G. at Surface of Kindjob HOOK WALL DistrictH011iburt°n ANCHORAGE
Recovery: Cu. Ft. Gas
cc. Oil
cc. Water Tester MR. FREITAG Witness FR. REINER
cc. Mud Drilling
Tot. Liquid cc. Contractor BRTNKERHOFF DRTLLING COMPANY BC
Gravity ° APl @ °F. EqU I PM E N T & H aL E DATA
Gas/Oil Ratio cu. ft./bbl. Formation Tested
RESISTIVITY CHLORIDE Elevation 1 5 m Ft.
CONTENT
Net Productive Interval 6316' - 691g' Ft.
Recovery Water ~ @ ~ °F. ppm All Depths Measured From Kelly Bushing
Recovery Mud @ °F. ppm Total Depth ' 801 I ' Ft.
Recovery Mud Filtrate ~ @ ~°F. ppm Main Hole/Casing Size 9 5/8n
Mud Pit Sample @ °F. ppm Drill Collar Length 62,52m I.D. 2.;75"
Mud Pit Sample Filtrate @ °F. ppm Drill Pipe Length - I.D.
Packer Depth(s) 6280
Mud Weight 12.2 vis cP Depth Te~ter Valve 6247' Ft.
TYPE AMOUNT Depth Back Surface Bottom
Cushion . Ft. Pres. Valve Choke 3/8" & 3/4" Choke 5/7"
·
·
Recovered Feet of Reversed out
Recovered Feet of
Recovered Feet of
Recovered Feet of
Recovered Feet of
Remarks See production test data sheet..°
Gouge No. 2859 Gauge No. 2858 Gauge No.
TEMPERATURE TIME
~, Depth: 6267' Ft. Depth: 6301' Ft. Depth: Ft.
Ca 1 c. 72 Hour Clock 72 Hour Clock Hour Clock Tool A.M.
.
Est. 160 °F. Blanked Off i NO Blanked Off Yes Blanked Off Opened 8-17 P.M.
Opened A.M.
_Actual °F. Pressures Pressures Pressures Bypass 21 ' 1 2 P.M.
Field . Office Field Office Field Office Reported Computed
Initial Hydrostatic 3992 3983 3990 3998 M,..,~, Minutes
.~ Initial 201 1 78 I 187 188
~.r. Flow.
~:& F~na~ 276 274 271 284 ' 523
Closed in 1253 1256 1258 1270 252
~ Initial
c o Flow
ua .r. Final
~ Closed in
-- initial
~ Flow
~.~ Final
Closed in
-'
_.Final Hydrostatic 3992 3975 3965 3990
--
FORUM IiJl-R1--PRINT£D JN U.S.A.
FORMATION TEST DATA
LITTLE'S 9&&7! IOM 8/74
6316-32 6522:vu ' '5/8"
Cosing perfs. 6644-50 Bottom choke. ,Surf. temp l0 'F Ticket No. 817878
Gas gravity 6911 -19 ,o. gravity.
Spec. gravity, .Chlorides . ppm Res. ~ ,.*F
INDICATE TYPE AND SIZE OF GAS MEASURING DEVICE USED
Date Choke Surface Gas Liquid
Time a.m. Size Pressure Rate Rate Remarks
psi MCF BPD
D.m.
5:00 3/8" ~
3/4" 0 Tools in rotary
8:15 Tools set
·
8:17 Tool opened with a fair blow, ¼" in
bubble hose in bucket
10'00 Weak bubble
12. O0 ,,
14-30 Increase in blow '..
17-00 Closed tool
17'05 Reversed out
12-12 Pulled tools loose
.....
,,
PRODUCTION TEST DATA
LITTLE'5 96672 51ul ~/74
Drill Pipe or Tubing ................
Reversing Sub ......................
6.17"
Water Cushion Valve ................
Drill Pipe ........................
Drill Collars ...................... 4.75"
Handling Sub & Choke Assembly ......
Dual CIP Valve ................... 5"
Dual CIP Sampler .................. 4.75"
Hydro-Spring Tester ................ 5"
Locked open by-pass 5"
Multiple CIP Sampler ...............
Extension Joint 5"
AP Running Case .................. 5"
Hydraulic Jar .................... 5"
VR Safety Joint ................
Pressure Equalizing Crossover .........
1,
Packer Assembly ................... 8 · 10"
Distributor
Packer Assembly ...................
Flush Joint Anchor .................
Pressure Equalizing Tube ..........
Blanked-Off B.T. Running Case .......
HT-500 Temp. Case
Drill Collars ......................
Anchor Pipe Safety Joint ............
2.88"
3.88"
3.88"
Packer Assembly ...................
Distributor
Packer Assembly ...................
Anchor Pipe Safety Joint ............
Side Wall Anchor .................
Drill Collars ......................
Flush Joint Anchor ..................
Blanked-Off B.T. Running Case ........
Total Depth .......................
TICKET NO.
LENGTH
~ i/~/~
DEPTH
11
2.25"
.87"
2.25"
.87"
3.75"
.87"
1 · 62"
2.26"
,
62.52'
4.87'
34.49"
5.31'
&18'
7.15'
4.14'
5.09'
3.03'
6134'
6208'
6247'
6267'
4.62'2 8
6280'
8.67'
3.99'
l'
38.02"
16.53"
54.55"
6301'
Tail
Total
8011'
EQUIPMENT DATA
LITTLE'$ 9eeTe 75C/t1/74
OIL AND GAS CONSERVATION CO~I~EE ~,0-283-20048
..........
MONTHLY REPORT OF DRILLING ~ ~ DES:G~A~O~
AND WORKOVER OPERATIONS A3~ ~878g
, ,,,
1. ~ I~ INDtA~ A~T~E OR TRII~E
WgLL W~LL
2. N~E""~F OP~TOR 8 L~IT F~ OR LEASE
CITIES SER~CE C0~A~ Easfi ~s River
3; X~n=ss o~ o~a ......
1016 W. 6th Ave. ~ Suite 420~ ~chor~e~ Alaska 99501 ~1
1980' FSL & 1980' ~ Wildcat
o~
Sec. ~8, ~4~, ~8w
7~-6
.
k
13.REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND C~/IEN'I'ING JOBS INCLUDING DEPTH
SET AND VOLLrlVlES USED. PE/R~OP. ATIONS, TF~TS A/VD RESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-TRACKED HOLE
AND A_NY OTTIER SIGNIFICANT CHA~G~ IN HOL~ CONDITIONS
Date
Present Operation
December 1, 1975 WOO.
Ran in hole with D. S.T. #12, no water cushion; set paeker at
62807 opened tool~ moderate to weak blow~ no gas to surface in
8 hrs. 47 minutes. Closed tool and SI for 4 hours buildup.
IHP 4042 psi; IFP 191 psi; FFP 276 psi; FSI? 1279; FHP 4017 psi.
Recovered 25' rathole mud.
Pumping mud down 9-5/8" x 13-3/8" annulus. Plugging details
on enclosed Sundry Notice form.
Cleaning mud pits and pumping reserve pit down 9-5/8" x 13-3/8"
annulus.
Displacing 'reserve pit down 13-3/8" x 9-5/8".
Prepared to cut 9-5/8" csg. with mechanical cutter.
200 sx Class G with 1~ CFR2 in 9-5/8" x 13-3/8" csg.
8 hrs.
Pumped
WOC
Moving rig out. Cut 9-5/8" csg 5' below G.L. ~ released
rig @,6:00 P.M. December 6, 1975.
Engineer
December 11~1975
NOTE --Reoort on this form is required for each calendar months regordless of lhe stotus of opwotions, ond must bo filed in dul)li--le with the
oil and gas conservation committee by the 15th of the succeeding month, uflle~ otherwise directed.
Form 10-403
REV. 1-10~73
Submit *' Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
2. NAME OF OPERATOR
CITIES SERVICE COMPANY
3. ADDRESS OF OPERATOR
1016 West 6th Ave.~ #420, Anchorage~ AK
4. LOCATION OF WELL
At surface
198o' Fsi, & 198o' ~
99501
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
· v
GR 15'
14.
CheCk Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-283-20048
6. LEASE DESIGNATION AND SERII
ADL 58784
7. IF INDIAN, ALLOTTEE OR TRIBE
NA
8. UNIT, FARM OR LEASE NAME
East Lewis River
9. WELL NO.
#1
10. FIELD AND POOL, OR WILDCAT
Wildcat
11. SEC., T., R., M., (BOTTOM HOLE C
Sec. 18, T14N, R8W SM
12. PERMIT NO.
75-6
)ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING L__J
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other).
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
, ~
CONFF-K;
FILE:
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
Monthly report of operations reports results of DST #1-12. All tested zones either
squeezed off or plugged above with bridge plugs or cement retainers. Placed 40 sx
cement plug from 6093 - 6212__~ Pumped~-remaining mud in mud pits down 9-5~8v x 13-3/8"
annulus at~._l.7 BPM~ 1~ psi~ pumped approximately 2310 bbls of mud from reserve pit
into 9-5/8" x 13-3/8" annulus. Mud in reserve became too heavy to pick up economically.
Mixed and p~uped 200 sx Class G with 1~0 CFRo 'down 9-5/8" x 13-3/8" annulus~ displaced
with 142 bbls fresh water~ 146 sx in formation, 54 sx in annulus. Calc TOC 2205'
or 150' above top of 13-3/8" shoe. Cut 9-5/8" casing 5' Below G.L. and pulled stub
with pack off assy. Cut 13-3/8" csg flush with 9-5/8" csg. Cut off 20" head and
placed 10 sx cement plug in 9-5/8". ~h dr--~ hole id~e~,~
fi~_~cation marker._ Released rig 6:00 P.M. on December , 1975. Will backfill reserve
pit to prepare for final inspection by state.
DATE 12-11'7~,
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY-.
TITLE
DATE
See Instructions On Reverse Side
\)
~
-
~
(y 4
~'(\J l
.~~
~
;)
~
¿
~
\
::::..
,.) f"ò
~ ~.
J::
t,¿ ..
" - ~
'i) ~ Ù f/
<J Ò
u~ ' . ¡
. ì I
~ d Q \.\¡i
I \.
~ I j ¡ \
0 ; \ : \
, . ¡' \
\ ¡
~~
~ -
~ ~
...e ~
~ \J
~
(J- ~
-4 ~~
~~
t ~
.......
¡~ ~
11
, ..:)" 00
~ C ::t¡
~ f'. ~ "f~
,t. J~~ ~
" ~ ~ ~.: ,'-
~ ~ ~~. I ~
'0 0 I
~ ~ ~i
,~
i'"
In'',\~'. ~... ---.1'? 1-
~
~S
~~
6
.' .... M~r'HLY REPORT O'F DRILLING
~,-, .~._. ~. ..~,i- C&ND~~OVER OPERATIONS
OIL ~ GAB ~ OT"'"
~LL ~LL
2. NAM.~- OF OP'mI:LATOR
ADDRESS OF OPERATOR
CITIES SERVICE COMPANY
1016 West Sixth Ave.~.,#420~ ...Anchorage, AK 99501 ..
4 LOCATION OF WTM
1980' FSL & 1980' FWL
AP! NUA~ERICAL CODE
50-283-20048
NA
Ease Le~s Rzver ..... .
Wildcat
Sec. 18, T16~, RS1
12 PERMIT NO
75-6
13. REPORT TOTAL DEPTH AT END OF MON~'I~. CI-I.A.~NGES IN HOLE SIZE, CASING AND CE/V[ENTING JOBS INCLUDING DEPTH
SET ~kN]) VOLLrB~q~ USED. PERFORATIONS. TESTS A/ND RESULTS FISHING JOB~ JL~NK IN HOLE AND SIDE-~q~ACKED HOLE
OTI{ER SIGNIFICA~IT CI-L4d~G~ IN HOL~ CONDITIONS
DATE PRESENT OPERATION
Novk 1, 1975 Drilling at 11,625' C~~At
2 Trip out of hole t:o log @ 11,636'.
3 Trip in hole to circ & condition for pipe. Ran the following logs:
DIL, with G.R. & S.P.; Sonic with G.R.; Comp. Neutron, Formation
Density with caliper; Micro laterolog; Dipmeter; Sidewall core gun.
Circulating while repairing Halliburton
Ran 7" liner in the following order:
Brown Oil To01 Hydraulic set liner hanger
5jts. 7" 29# S-95 LTC:.csg
1 XO sub LTC box x 8rd pin
43 jts. 7" 29# S-95 Hydril FJP thread
1 B.O.T. landing collar
1 jt. 7" 29# csg. Hydril
1 B.O.T. junk collar
1 jt. 7" 29# S-95 Hydril
1 B.O.T. float shoe
Lensth Top
16.7' 9646
200.68' 9662.7
.91 9863.38
1680.8 9864.29
.95' 11545.09
38.61 11546.04
.95 11584.65
38.1 11585.60
1.8 11623.70
Bottom of liner 11,625.50'. 238' of liner overlap.
5 Circulating - wait on cement
6 Condition mud for D.S.T. #1. Tagged top of 7" liner, no cement,
tested liner lap and casing to 1000 psi for 15 min.; held O.K.
7 Running cement bond log and collar locater~.
8 GIH with D. S. T. #1; perforated 11,293 - 11,298' (5') with three
shots/ft.
9 SI for build up D.S.T. #1. Set RTTS pkr at 11,232'; bottom of
tailpipe 11,250' .!~ Opened for flow, with valve SI at surface. 60
psi afteri5 min., 135 psi after 10 min. Opened to pit thru a
3/4" choke pressure bled to zero in 30 secs. Flowing back wtr
._.,,__cushi°n%~' No gas or water to surface. SI for bottoTM
mo~%Al%~_--J~_..~~_~ nTL~ gngineer m,T~, December 10, 1975
'"', --' ~ 7 ~,~¢' ~ , ~ ~ ~'7~i~ .......... ' '
NOTE--Report co this form il require4 ~r ~ calendar month~ regardless of the status of operations~ and must ~ flied in duplicate with tbs
oil and gas ¢onservatbn commiflee byt#e 15~ of the suc¢~eing ~n~, ~le~ Otherwise dweeted.
Monthly Drilling Report
December 5, 1975
Page Two
Date
Nov. 9, 1975
Nov. 10, 1975
Present Operation
(cont'd) hole buildup. ~,~,,~-~.g~--~,? ~,,.~
Building mud wt. Recov~'~'~'I~/3bB1 heavily gas cut mud between
circ sub and dual CIP valve. Chlorides of formation H20 21,500
ppm with a pH 7.8
DST #1 IHP 8249 psi
1 hr. initial flow IFP 5027
FFP 5076
2 hr. SI FSIP 8249
6 hr. flow period IFP 5076
FFP 5126
Dumped 3000' water cushion
4 hr. flow period IFP 3792
6 hr. SI FFP 3941
FSIP 8249
FHMCP 8249
CONFIDENTIAL
11
12
13
Chart indicates that the Fm pressure is greater than 8249 psi.
Running D.S.T. #2. Increased mud wt. to 14.7#/gal. Perforate
11,298 - 11,303; 11,245 - 11,255; 3 shots/ft. D.S.T. #2 run
with 5,000' 3% KC1 H20.
GIH with D.S.T. #3. D.S.T. #2 tool opened for 4-3/4 hrs., weak
blow .at surface. No gas or water to surface. Load D.P. with
72½ bbls fresh wtr and attempted to pump in formation with 6500
psi surface pressure. Flow tested well with full wtr cushion.
Flowed at rate of 19.6 BPD. SI for buildup, reversed out re-
covered 15 bbl formation H20 C1 22,000 pH 9. Set Howco EZ-SV
cement retainer at 11,225'. Perforated 10,911 - 917 and 10892 -
10902 with 3 jets/foot. P.U~ tools for D. S. T. #3.
Conducting D.S.T. #3.
D.S.T. #2
IHMCP 8890
2-3/4 hr. initial flow IFP 2571
period FFP 2971
14
15
Load D.P. with fresh wtr 5192
wtr. column pressure
4 hr. final flow period IFP 5218
FFP 5221
3 hr. SI FSIP 8306
FHMCP 8869
~Squeezing perforation @ 10892 - 10902; 10911 - 10917. Flow tested
D.S.T. #3, weak blow at surface, no gas or wtr to surface at end
of 21 hrs. 40 min. flow period. SI for buildup, reversed out re-
covered 69½ bbl of Fm water - C1 25,000 ppm-pH 7.5. RIH w/
EZ-SV retainer, set at 10805'.
D.S.T. #3
IHMCP = 8610 FFP = 4420 FHMCP = 8610
IFP = 2718 FSIP = 7203 5 hr. SI
Flowing well on D.S.T. #4. Squeezed perforations @ 10,892 - 902,
10911 - 917; squeezed to 6000 psi standing pressure with 100 sx
Class G with 18% salt, 1% CFR-2 & 0.4% HR-7. Perforated 10684 -
10700 & 10704 - 10728 with 3 jets/ft. TIH with D.S.T. #4 with
5000' 3% KC1 H20 cushion. Set pkr at 10640. Opened tool and
Monthly Drilling Report
December 57 1975~
Page Three
CONFII HTIAL
Date
November 15, 1975
16
17
18
19
20
21
Present Operat~:~-:~: ~.;..-~
, ' ~..~ ~'~.~. i', ...~~ ':~ .... :'~ ..... ·
(cont d) had wa~er cus~q~to...surface zn 1 hr & 42 mins.
· . ~i!~-~ :.~ ?~!~ ~.'~ ,,
55 psz flowzng pressure't~r~ 3/8 choke. After 7½ hrs.
well flowing slugs of gas & water.
P.O.H..to lay down cemented DP. D.S.T. #4 continued, well
flowing salt water at 467 BWPD on 3/4" choke with 8 psi
surface pressure. SI for buildup. Reverse out. Set cmt
retainer at 10665. Mixed 300 sx Class G with 18% salt,
1% CFR2 and 0.3% HR-7. Attained squeeze pressure of 6500
psi with 6 sx in formation. Pulled out of retainer and
attempted to reverse out; cement set up.
TIH with RTTS. Layed down cemented DP; perforated 10618 -
10620, 3 shots/foot. TIH with RTTS to block squeeze above
perforation.
TOH with bit. Broke down perfs from 10618 - 10620 at 4900
psi at 1.2 bbl/min. Squeezed perfs from 10618 - 20 with
100 sx Class G with 0.3% HR-7 and 1% CFR2. Squeezed to
6000 psi in 3 squeezes; released pkr, pulled two stands,
tried to reverse out, would not reverse. POH wet, layed
down 450' cemented DP, TIH with bit, CBU, drilled 44'
cmt in 45 minutes.
TOH for D.S.T. #5. P~ RTTS pkr and set at 10565 to test perfs
at 10618 - 20, pressured to 5000#, O.K. T.O.H., TIH with bit,
drilled cmt retainer at 10667 & cmt below retainer 10671 -
76, CBU and POH.
Flowing D.S.T. #5. TIH with D.S.T. #5, opened tool for 10 hours,
no gas or water te surface. SI for 6 hrs.; reversed out, recovered
31.1 bbls gas cut ~i~formation water C1 22,000 pH 11.0.
Picking up tools for D.S.T. #6. POH with D.S.T. #5. Set cmt
retaine[ at 10678, broke down perfs at 10684 - 700, 10704 - 28,
squeezed with 50 sx Class G with .4% HR-7 and 1% CFR?; squeezed
at 4200 psi increasing to 5000 psi, reversed out cementing string
TOH, perforated 10648 - 68 with 3 shots/ft; tagged hard fill
at 10670 with wireline.
22
23
24
D.S.T. #5: IHP 7986 psi FSIP 7689 psi
iFP 2731 psi FHP 8090 psi
FFP 4278 psi
Picking up tools for D.S.T. #8. Set D.S.T. #6 pkr at 10643;
shear pin on reversing tool failed, released pkr, reversed
out, POH, RIH for DST #7, shear pin on tool failed, released
pkr, POH, made up tools for DST #8; removed shear pin reversing
sub.
POH with DST #8. Set DST #8 pkr at 10581, testing 10648 -68.
Opened tool with moderate to strong blow. Water cushion to
surface after 8 hrs., no gas to surface. Tool opened for 12
hrs. & 26 mins. SI for 3 hr. buildup, POH. Formation water
C1 23,000 ppm pH 10.0.
Circulating and conditioning mud system. Set cmt retainer
10500'. Set 20 sx plug Class G neat on retainer. Pulled to
9718 set 120 sx plug Class G neat and pulled to 9270, reversed
out. Circulating and conditioning mud to 12.5#/gal. Plugs
Monthly Drilling Report
December 5, 1975
Page Four
Date
November 24, 1975
Present Operation
(cont'd) approved by Mr~i'J~6~n-i~:Mi~er, Division of Oil & Gas
by telephone 11-24-75.
DST #8: IHP 7665 psi
IFP 2842 psi
(.After 12½ hrs flow) FFP 5186 psi
tSIP 5726 psi
(After 6½ hrs) FSIP 7970 psi
25
26
27
CONFIDENTIAL
Flowing DST #9. Circulated and conditioned mud, layed down
3½" DP and 4-3/4" DC; perforated 8090 - 8110 at 3 shots/ft.
Picked up test tools for DST #9; filled with 5000' 3% KC1,
set pkr at 8058, opened tool with very weak blow.
Flowing DST #10. Reversed out DST #9. Tripped out to dump
water cushion, reset pkr at 8058, opened tool-moderate to weak
blow.
Waiting on weather for overshot. Flowing DST #10, no gas or
water to surface in 14 hrs. SI for 1 hr., opened tool for
2 hr. flow - very weak blow; SI for 3 hr buildup. Reversed
out, POH.
IHP 5298 (2nd) IFP 987
(lst) IFP 197 " FFP 1233
" FFP 814 " SIP 3027
" SIP 2511 FHP 4805
Formation water CL 20,000 pH 11.0. RIH with wireline BP,
BP stopped at 1834', could not move up or down, line shorted
out, could not set plug. Pulled out of rope socket at 5000#.
Waiting on overshot.
28 POH to perforate. RIH with overshot, fished collar locator
& setting tool, retainer would not go up or down. RIH with
bit, drill retainer and push remains to 8090, CBU, POH, RIH
with cmt retainer on drill pipe, set at 8012.
29 DST #11, shut in for buildup.
Perforate 6911 - 19, 6644 - 52, 6522 - 30 and 6316 - 32 all
3 shots/foot. RIH with DST #11, set pkr at 6282. Opened
tool - moderate to strong blow; gas to surface after 2~ hours
TSTM, SI for buildup.
30 GIH with DST #12. DST #12 shut in for buildup. Opened for
2 hr. flow, closed for 3 hr buildup, reversed out C1 18,000
ppm pH 12.0, RIH with RTTS, set pkr at 6285', pumped 50 bbls
3% ~C1 H2~, reversed out TOH with pkr, PU DST tools.
SIGNED TITLE Engineer DATE 12-10-75
, MONTHLY :';REPORT O'F DRILLING--
AND WORKOVER OPERATIONS JADT- ~, "-
1980' FSL & 1980'
jt2 P~IT ~0
. _ .
S~ ~ VOL~ gsa, P~OP~T]O~S. ~S ~ ~S~L~ Y[SHI~G JO~ ~b~ ~ HO~ AND ~[D~'~AC~D SO~
Day Present Operation
Oct. 1 Drilling at 8208' 12~''
- --hole
2 Drilling ,at 8382'
3 Drilling 8570'. Survey 0o at 8568
4 Drilling 8759'
5 Drilling 8923'
6 Drilling 9117'
7 Drilling 9260'
8 Tripping in hole with new bit at 9404'
9 Drilling 9470'
lO
ll
12
13
14
15
17
¢O#FIDENi'i I
survey 3/4°
Wt Grade Thre ad Fee t Total Depth
4~. 5~ P-11d LTC 2--~' a640'
47 N-80 Buttre s s 874' 3 514'
47 N-80 Buttress X LTC 44' 3558'
47 N-80 LTC 2364' 5922,
47 P-110 LTC 392, 6314'.'
43.5 s-95 LTC 833' 7147'
Baker Stage Collar 1.7' 7149 '
43.5 S-95 LTC 842' 7991'
47 S-95, LTC 1779'
SIGNED
on this form is required for each
oil and gas conservation commiftee by the 15th of the succeecling month, uflle~ etherwise directed.
Drilling 9582'
Trippifl~g~.973 5'
Drilling 9887'
Logging 9894', Dual Laterolog with GR & SP.
Logging 9894', Sonic, Gamma Ray, Compensated Neutron Formation Density
with Caliper.
9894' Tripping in hole with D.P. to condition hole for casing. Ran
Micro Laterolog, Dipmeter and two runs with core gun.
9894~ Running 9-5/8" casing.
9894~ Wait on cement. Ran 9-5/8" casing in the following order:
Submit "1 ntentions" In Triplicate
"Subsequent Reports" In Duplicate
Form ! 0-403
REV. 1-10-73
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
U~e "APPLICATION FOR PERMIT--" for ~ucl3 proposals.)
o,L I'-I GAS ~
W£t..Lm ~ WELL m ,~J OTHER
NAME OF OPERATOR
Cities Service Oil Company
ADDRE55 OF OPERATOR '
1016 West 6th Avenue, Anchorage, Alaska 99501
5. APl NUMERICAL CODE
50-283-20048
6. LEASE DESIGNATION AND SERIAL NO.
ADL 58784
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
UNIT, FARM OR LEASE NAME
East Lewis River
9. WELL NO.
NO. 1
4. LOCATION OF WELL
10.
At surface
1980' FSL and 1980' FWL
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
15' GR
Check Appropriate Box To Indicate Nature of Notice, Re
FIELD AND POOL, OR WILDCAT
wildcat
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 18-T14N-R8W, S. M.
12. PERMIT NO.
75-6
)ort, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ABANDON* SHOOTING OR ACIDIZING ABANDONMENT*
REPA1R WELL CHANGE PLANS (Other)
. .
(Other) (NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
~ .. 3,5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly State all pertinent details, and give pertinent dates, including estimated date of
starting any propoSed Work. ' '"
Changes in availability and a recheck of our inventory force us to request another
change in our 9-5/8" casing string. The following string is submitted for your
approval.
Grade Weight Type Thread Length TVD
P-110 43.5 LT&c 2800 2800
N-80 47 LT&C 3300 6100
P-110 47 LT&C 400 6500
S-95 43.5 LT&C 1700 8200
S-95 47 LT&C 1800 10000
Safety factor calculations are enclosed
OCT 1_ ~ 1975
Drilling Engineer
DATE 10/8/75
(This Space for State office uSe)
CONDITIONS OF AI~ROVAL, IF ANY~
See Instructions On Reverse Side
Approved Copy
.................. ' ........ DATA ..............................
CASING DESZGN FOR 9.625 INCH STRING
HUD WE[GHT =lO-O LB./GAL ..
ESTIMATED SURFACE PRESSURE = 3000-0 PSI
DEPTH OF CASING =10000,0 FEET (MD)
! .
GRADE WEIGHT LENGTH TVD-DEPTH * TENS[ ON
'.
!
95 47.00 1800o0 lO000-O 1053-0
,
95 43-50 1.700.0 8200.0 9'60.0
C OLLAP$ E
7 I00.0
5600.0
BURST
8150.0
7 s o.o,
110 47.00 400-0 650~-0 1213-0 5310.0 9440;0
80 . 47-'00 3300.0 6100,0 905.0 '41 50.0 ,687 0.0'
·
I I0 43-5° 2800-0 2800-0 ! 106.0 4430.0 '8700.0
..
.
,i
.,
· ALCULATI eNS
~N~m.~m m ~ N . e m i ,ih. I ~11,.c . mmm~mmm--m mmmmmmmm-mmm mmm mm
SECTION SECTION'
NUNBER WEIGHT
I 8.4600-0
73950°0
.
18800'0
4 I55100-0
CUMULAT! VE
t~EIGHT
8.4600.0
58550.0
177350-0.
332450,0
ADJUSTED
COLLAPSE
7 I oo- Oo.
5336'92
4928.84
4215.67
..
5 121800-0 454250.0 3611 .47
SAFETY. FACTOR ' · TENSI ON
11 ~e, 447
6~ 05,5
'SECTI ON
'NUMBER
1
3
·
4
HYDROSTATIC INTERNAL
PRESSURE PRESSURE
,
5
52.00- 00.
4~64.00
540'00
tOSO.OO
..
I 170.00
21 60.00
3000.00
*SAFETY FACTOR
BURST
6,840
2,722
2.435
3350-00
3172-00
!
1456.00
SAFETY FACTOR
COLLAPSE
'1,365'
I ,252.
5.093
- .
7 -152 .
I .458
1 - 329
E,480
8 .,~68
,,
3,181
OCT (- g75- '
PROGRAM STaP AT 990
Monthly Report of Drilling & Workover Operations
Cities Service Company
East Lewis River #l
Page 2
Day
Present Operation
Wt. Grade Thread Feet Total Dep.th.
Baker Float Collar 1.6' 9771'
47 # S-95 LTC 89 9861'
Baker Float Shoe 1.7' 9863'
Cemented 1st stage with 80 sx class G with 2~!~ gel and 0.4~
HR-7. Followed by 910 sx Class G with 18~ salt and 0.2~ HR-7.
Cemented 2nd stage with 640 sx class G with 18~ salt.
Oct. 18
19
2O
21
22
23
24
25
26
27
28
29
3o
Picking up new BHA. Tested pipe rams, blind rams, choke manifold
system, and all valves to 5000 psi for 10 minutes each. Tested
Hydril to 3000~ for 10 min. O.K.
9949' Tripping for bit#31.
10,096' Drilling 8½"hole.
10,280' Drilling.
10,453' Drilling.
10,563' Drilling.
10~673' Drilling.
10,853' Drilling. Mud Wt. 12.4.
11~010' Drilling. Mud Wt. 12.9.
11,198' Drilling. Mud Wt. 13.3.
11,234' Circulating to raise mud wt. to 14.0. O
11,242' Drilling, mud wt. 14.2. Tested BOP & E to 3000~. '~ ~
11,409' Drilling~ mud wt. 14.4.
31 11,552 ' Dril~g~ud wt. 14.7.
Ft)cm No, P--4
STATE OE ALASKA
OIL AND GAS CONSERVATION COMMII-rEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
o,~ ~-~ o*, [-~ o?~z, Wildcat
WI~L~ __ WI~LL
Cities Servige O~l Company
~ ADDm~SS OF O~m~rom 1016 West Sixth Ave., #420
Anchorage, AK 99501
,41 LO~ATION OF W~
1980' FSL & 1980' FWL
x=362,666
y=2,668,756
SUBMIT IN DUPLICATI:
! 50-283-20048
S. t~IT FA~ OR LEASE N~E
East Lewis River
. w~ ~o i----~- ~' I
Wildcat
o~
Sec. 18, T14N, R8W S.M.
Bell Island
Ii. PERMIT NO
75-6
13. REPORT TOTAL DEPTH AT END OF MONTH. CIiA. NGES IN HOLE SIn'-E, CASING AND CEMENTING JOBS INCLUDING DEI~'I:H
SET AND VOLUMES USED. PERFOHATIONS. 'rF~TS A_N-D HESULTS FISHING JOBI/; JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHA~I3ES IN HOLE CONDITIONS
September 6, 1975
7
8
9
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
28
29
30
Move and rig up. L'OliFI [I TIAL
Rig up.
Rig up.
Rig up.
Rig up.
Rig up and drilled to 100'. Spud at 6 A.M.
Drilled to 370 feet. Run 361.36, 20", 94#; pumped 20 bbls
H20 ahead of cmt job. Run 500 sks Class G followed by 200
sks of Class G with 2% CaC1. Good returns. W.O.C.
W.O.C. 12 hrs. Drilled to 520 feet.
Drilling at 1690'.
Drilling at 2375' and circ. hole for casing job.
Circ. hole. Run 2360 ft. of 13-3/8 casing. Run 575 sks
Class G with 2.5% prehydrated gel, 1040 sks Class G, and
200 sks Class G with 2% CaC1. W.O.C.
Nipple.up. W.O.C.
Tested B.O.P. to 3000 psi. Witnessed by John Miller, Petro-
leum Engineer for the State of Alaska.
Drilling at 2442'.
Drilling at 3304'.
Drilling at 4916'.
Drilling at 5681'.
Drilling at 5876'.
Drilling at 6166'.
Drilling at 6420'. B.O.P. test.
Drilling at 6718'.
Drilling at 7003'.
Drilling at 7334'.
Drilling at 7836'.
Drilling at 8001'. B.O.P. test.
OOT ? 1975
/~.~,./.~~//~ Drilling Supervisor r,.~ 10-7-75
SIGlt1ID
N~TE--~eport on this fo~ i8 required for ~Ch GOlendor ~th% regordless of the status of operations, and must ~ filed in duplicate with the
oil and gOS conservation commiflee bythe 15~ of the suoc~ding mn~, ~le~ otherwise directed.
02-0018 (REV, 08-73)
MEMORANDUM
DEPARTMENT OF NATIJRAl RESOURCES
Division of Oil and Gas
TO. iJPdW
O. K,. Gilbreth, Jr "
Director ' Af~
THRU: Hoyle H. Hamilton /J1PP
Chief petro,'eum ~gi~e~
FROM: Ben Le Norman () " \
Petroleum Inspector ~
State of Alaska
DATE:
September 29,1975
FILE NO:
TELEPHONE NO:
SUBJECT:
Cities Service's East Lewis River
No.1, BOPE Stack Test.
J
John Miller and I departed our homes approximately 1:15 AM, Thursday
September 18,1975 fora Cities Service chartered aircraft at Merrill Field
for departure at 2:35 AM to Beluga River airstrip. We arrived at Beluga at
2:55 AM and were met by Pat Clendenin, Cities Service Drilling Foreman, who
drove us to their camp, arriving at 3:30 AM. At camp we met Harvey Moore,
Toolpusher for Brinkerhoff Rig No. 58, who informed us nippling up was still
in progress.
At 6:45 AM we arrived at the location as Ha,11iburton pressured up the BOPE
stack and chok,e manifold. A plug valve leaked immediatel.v.Whilerepa1rs
were attempted we toured the location which was cleanandwellorga1nzed.
Tbe reservep1t was well constructed but no berm was around the fuel tanks.
The wel1sigR was correct but was at the c,amprather than the location. We
returned to camp pending repair' of the plug valve.
We returned to the rig at 10:.30 AM and successfully tested pipe rams, Swaco
Super Choke and repafredp!lug va.lv'e to 2950 psig.. Howeve'r, two plug valves
and both manua 1 adjustable chokes leaked despite flushing andregreasing. We
returned to camp at 11:45 AM while repairs were attempted. -
We returnéd to the ri,gat 4:50 PM but the twopl ug valves and two manua 1 ad-
Justable chokes st1111ea.ked badly. CheckedN2 bottles at the accumulator
wh1eb werepre'ssared to 235'0 t 2400 and 1200 1>519 respectively.. Returned to
camp a t5:'45 PM
We returned to tber1gat 9:30 PM to find all seven choke manifold valves,
the two manual adjustable chokes, the three 1'nch valves adjacent to the stack
on the kill line andman1fold line, the pipe rams, and blind rams tested
succes'sful1y from 3000 to 3150 psig. The, hydri land kill 1 inecheck val ve
tested to 2400psig.Thekelly cock and lower .kelly Yialve were tested to
3100psig.BOPE's wereactuatedwlthpr1maryand remote controls. Except
for floor valves, tests were c~pleted at 12:30 AM Friday, September 19, 1975.
Final trip to rig was made Friday morning to determine ball type and dart
type floor valves were on floor with wrench. Field Inspection Report was
completed Boting the following deficiencies:
1. Installs1gnat well site.
2. Replace 1200 psig N2 bottle.
"'"
'I"~
@R63072
"":"""'..
" """",",'
" ".."
O. K. Gilbreth, Jr. Page 2
Ben Le Norman - Field Trip Report
Cities Service's East Lewis River No.1
September 29~ 1975
These deficiencies were discussed with Pat Clendenin and Harvey Moore and a
copy giveR to Pat with an additional copy to be mailed to B. B. Edwards,
Production Ma'nager t in Denver (see copy attached).
We departed lewisR1ver tamp at 10:20 AM for Beluga airstrip and boarded a
Cities Servi,cecharter at 11. :15 AM arriving in Anchorage at 11 :40 AM.
In sunmary, the BOPE stack" choke manifold assembly andke1.1yvalves on
Brinkerhoff Drilling R1gNo. 58 were successful1'y tested to 3000 ps1g in order
to drill out from under surface on Cities Service's East Lewis River No. 1.
OK; ': be
(
/
(
JJ(lJP
r"
ø~f)
~
-~. .
l
'~ ...- "-
~ II
. ~
'b
q:"
tì ,\
¡i t;. 't
C;lt1
;;;
l
~
~
---
--.,...
70#1 (,./;)
IJ~"
Ii VMUL.
~- ø ¡() ,ò if'
~--'J
[ -. ~~ - "
.-.---,- ..3
' ,
.--.
----
ß . J\ ,"'I /;~, ..:tlt~
AIN/"./:¡:""Y2.loJ.ð¡;¡:" I..)¡:?(G. ,~. """"""'<:1' -- I
é!/rv .sc:~f:;:!~'/,~¡;".iI. - £;(:)$;7 ~'~t,.\J.I.s K;;,
1:1-/
/-Ø /-::.~
!¡VJ';."Ir rOt(
, SG'tI*.;p~'fIi;f'r:.
!
/;õ.. AI 1<..
~ --~--
,~-"""._."._-,
(
.
@;..., ~ ~. .:,'~~~~':'~:":::::-:.:~:~'::':;;:.::7::;~-,.t,.,...i
-....-. CII' - I'll """'" """,.".,.
~'"..~ -~
~. :(
t
1# d./j
""]""I
./,t'~Þ~tßfr.:
~rj;.",(,~
$I AC""""", Oil and Ga~ Conservation Coßll1iffé\!
~ìi,t'; . ........ ..,..... ' Field Inspection Report ' '
~:'!iQ'r:.lg. PermitNQ~7-'~~ . , ."'.'. . ..".. ,. . .".'011... ,.. .....,' , ...W~lll,Pl~tflJl . Se.cIJ1}Y~i!JfL"
.. Opera tor C~I~""')f(¡"y ...::.t£jtf!IJII' ~- Represented byQeMb6'W¿#";" Name & Number .".. , "'/¡~.;.
:\~~;otÌ(~..~..:¿it/~"".I<'QX~P:f4l A1(;~ '1/'p , .. n.<~Q'-'ð(;)(;: ~~'y~-?P.-#t'"
"Satisfactory' Type Inspectlon Sat; sfactory Type .lnspecti on
!it' Te} (~lt~~S~~~:~iøh.GenE~ral t~(H) ti~~g:~n~e~:~ @.;s.r~'
,';:;, (~ () 2. ߨn',~rålHöUse.,keepin9(~( } 16. Test'flU;d-(~t"F7T )mudt?,q:;l
I'(~ () '3. Res~FvePft..( )open( )filled (.~ ( ) 17. Mas,ter Hyd..controlSys. -.lA.LPstg
iLw?';(~{')4. :'Rig"" " '" ',' ,f} (~18~N2't1t:ls'~33rd\12Q~~¿;l~¡p\~!;;g"
':' ,[JSaf.etyValy,eJests (W- () 19. Remote Controls -
() () 5. Surface-No. Wel s (..r- () 20. Drilling,spool-:-.illout1ets
() () 6. Subsurface-No. Wel 1 s (~ () 21. Ki 11 L;'ne-'(~Check valve
()Well Test,Oata (~() 22. Choke Flowline () HCR val va
t¡ ~ ¡ ~: ~~~~~b~~r', , , , , ~~t .~ ~~: ~~~~~5~{~~~~t~h~:~~{~~~:S ,~l
() () 9. BS&W , (~{ ~,25. Test Þlu9~{~Jelíhd( )csg( )non:e
() () 10 . Gr. Bbls. '",,- -' (~()26. ArlnUlar Prevénter ,~si p
" " , ""f ) Final Aþandonment " (~~("') 2/1. BljntiRams~s~ig
() ()'ll.p~Rêr',' . ,,1 . ,.,' , .(~f)28. Pipe Rams ~Dsiq
, () () 12. ~Jater,wéll-f )capped{}p1 ugged (~if) 29,. Kelly & Kel,lY-cock~.ch9Psig'
k () () 13. Clean-up ,(~ '" ()30. Lower Kelly valve ~~Sif' ','~,'ì
»tJ( ). 14. pad leveled ," " .(~:.(.) 31. Safety Floor valves~(t V Cw)!)att',y"<
~otal în~e(;tï°n observati on time1:.!'- hrs/"iI~.. 'Iotal. numberÀak~and/or eQujp. fail ures~".'.,.,,','.,",',,'.'..','..,..,','.,'"..,,",'.." ','"
, emarks-UJ -:rAJ...ç'-n9~ ~ SH:,A/ ~, .,~ s.;)"'ItI' -~AiGtf~r;,g ~fa .¡J;Ð.---'-',S/ ",(
: ,', ",,'.,',,'., "..," "","".', ,"',,' ',,' """,.""".,>t'ij
in . days orwhenreaclY '" "". ,Inspected bYÀ4<=~ Date~-..J9,';¡J',;~;(~
:~:.- -':~"-~,,~ .~."'~-~, ,~, ._\. ~>c.~ ~~~~= ',,-~~...,..--- ,-~ ~~:~ '" . '~~,., ._.'- ~ -~i1,.'
Form
STATE OF ALASKA
APl NUh~F-..F~ICAL CODE
OIL AND GAS CONSERVATIONco v 'i'r EP2 $1975 50-283-20048
8. ~E D~GNA~oN ~D SERIAL NO.
(,
~ ~3ADL 58784
..
(Do not use tb~ Io~ for proposals ~ drill or t z'- * '~ =
OIL ~ GA8
WELL W~;LL
2. NAME OF OPEI:L&TOR
CITIES SERVICE 0IL C01~ANY
3. ADDRESS OF OPERATOR
1016 W. 6th Avenue, Anchorage, Alaska 99501
4. LOCATION OF
At surfa~
...
1980 FSL & 1980
Sec. 18-14N-8W SM
ELEVATIONS (Show whether DF, RT, GR, etc.
..
15' GR
Cho2..k.~h~Froprlato 8ox 1'o Indicate Nature of NOtice, Re
~,.
NOTICE OF INTENTION
TEaT WATER aHUT-0FF ['q-. PULL OR ALTER CASINO [~]
FRACTURE TREAT MULTIPLE COMPI.ETI:
REPAIR WELL CHANO~ PLA~8
t Otherl'
East Lewis River
9. WELL NO.
No. 1
10. F~"-Lr) A.N'D POOL. OR WILDCAT
Wildcat
n. sec.. r.. ~.. ~.. (mazro~ ~o~
OBJECTIVE)
Sec. 18-14N-8W SM
12. PI/2:LMAT NO.
75-6
~on, or Other Data '.-
BUBaEQUENT REPOBT OF:
FRACTURE TR~ATMSNT ~LTERINO CASINO
8HOOTING o~ ACIDIZIN0 , ABANDONM/HT*
(Other)
(Norm: Report ~esults of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DERCRZUE PROPOSED OR COMPLtrTED OP£RATIONn (Clearly state a'll pertinent details, and give pertinent dates, including estimated date of startln8 any
proposed work.
Because of casing availability the following is submitted to change the 9-5/8"
casing string:
9-5/8" casing program:
0 - 2800 43.5# P-110 LT & C
2800 - 6100 47# N-80 LT & C
6100 ~ 7500 47# P-ll0 LT & C
7500 - 8200 43.5# S-95 LT & C
8200 -10,000 47# S-95 LT & C
16. I hereby cekt~u,~~/~}eSoln~ i. true~d correct
TITLE Production Manager
9/18/75
DATE
(This space for State_office u~e~
CONDITION80F~PROV~L, IF ' -
See Instructions On Reverse Side
Form 10.403
REV.
Submlt "1 ntontlons'* In Triplicate
& ,*SUbSequent RlDort~' Irt Dupllctt!
STATE OF ALASKA
~-= OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for Droposels to drill or to deepen
UsO "APPLICATION FOR PERMIT--" for such proposals.)
oil r-I oas
oTH,,
2, NAME OF OPERATOR
·
Cities Ser~rice 0±1 Company
3. ADDRESS OF OPERATOR
1016 W. 6th Avenue, Su/te .[~20, A~chorage, Alsska 99501
4. ' LO~:ATION OF WELL
At surface
1600' FWL, 1700' ~
y = 2,681,050
13. ELEVATIONS (Show whether DF, AT, OR, etc..)
14.
Check Appropriate Box To Indicate Nature of Notice, Re
NOTICE OF INTENTION TOt
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
5. APl NuMERICAL'CODE " ............
~0-285-200)~7
16. LEASE DESIGNATION AND SERIAL NO. '
ADL 58801 ,
7. IF INoIAN,'ALLOTTEE OR TRIBE NAME
None
8. UNIT, FARM OR LEASE N/~ME .....
Lewis River
9. WELL NO.
No. 1
10. ~IELD AND POOL, OR WILDCAT '
Wildcat ~
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Bell Island
Sec. 2-T14N-R~W S.M.
12. PERMIT NO.
)ort, or Other Data
SUBSEQUENT REPORT OFt
WATER SHUT-OFF ~ REPAI RING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other) . _
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
'15, DESCRIBE PROPOSED OR COMPI~ETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work. ,
Refer to memo to B. B. Edwards from J. O. Scott, 9-12-75.
Complete, flow and buildup tests of separate completed'
zones. (3948' -4364'), (4730' - 5036'), (5535' - 5764').
1975
DATE. September 16, 1975
(This il)ace for State office use)
~C~N~%~i~:~ ~~"~'~ -~° ~ TITLE :J~-~ ~C~...'[~;, , ,} DATE ~// ~ / ~S~
O F~ROVAL, IF ANY, .... -- ~ ' ~. -- '
~ Imeu~iom On Revere Si~ ..~
~LL NAMP"k
................ DATA
CASING DESIGN FOR 9.6~5 INCH
MUD WEIGHT =10.0 LB;/GAL
ESTIMATED SURFACE· PRESSURE =-
..
DEPTH OF CASING ':lO000.O FEET
I
STR i I,i$
3000.0 PSI
('MD)
GRADE WEIGHT LENGTH T.VD-DEPTH TE,NSi ON COLLAPSE BURST
95
95
IlO
80 '
47 * O0
43 * 50
1800-0
700.0
.
10000.0 1053-0
.
8200-0 960.0.
' 47o'00 1400-0. 7500-0 1213-0
43,50 .2800.0 - - 2500,0 ..... llO.&°O -
........ ' :": '':;, $
.
.
.7 1oo; o
56o0.0
5310,0
47 50-0
.. .
4430°0
8150'0
·
7510.0
·
9440-0
68f O* 0
8700-0_
SECTI ON
NUMBER -
.
4
5
' SECTI SN CUMULATIVE ADJUSTED
WE! GHT . WEIGHT CI~LLAPSE
84600*0 $4600-0 7 iO0-O0
t
30450-0 115050.0 5336-92
· , .
6.5800'0,_- 180550.0
.!55i00,0 335950,0
121800*0 4577.50*0
HYDROSTATIC
PRESSURE
5 ~ mo 0.
INTERNAL
:~RES'SURE
540. O0
42 64o00 7 50-00
5040;24 3900-00 1170.00
4203o7e
3601 * 17
3172.00
1456-00
·
21 60.00 '
3000°00
SECTION '
NUMBER ~ -
· SAFETY FACTOR - TENSI eN
12-447.
-
8.344
SAFETY FACTOR.
C[~LAPSE
l -365
i .252
'SAFETY FACTOR
BURST
·
15.093
lOoOl3'
'6,7 07
694
I * 292
! · 325
8.068 .
·
2.416
..
2*473
2-900
\
II
:1.
\.
'I
\
\\
April 15,1975
Re: East Lewis River #1 ,
Cities Service Oil Company
Permi tNo .. 75-6
Randy Hicks
1016 West Sixth Avenue
Suite 420
Anchor,age,. Alaska 99501
Dear Sir:
Enclosed ts the approvedappl'ç_tionforperm1t to dri'11 the above referenced
well atalocation 1'n Section 18. Township 14M.,Range S ~1.. .S.M.
~'el1samp1es, core chips, and a Mud log are required. A directional survey
is not required..
Many r1versin Alaska and their drainage systems ba,ye been classified as
important for the spawning or n1igrat10,ft of anadromous fish. Operations in
theseareasaresubj.ect to AS 16.50.870 and the'regulationspromulgated there...
under (Title 5,1 Alaska Administrative Code). Prior to commencing operations
you may be contacted by the Habitat Coordinator's office, Depar'tment ofFish
and Game .'
Pollution of any waters of the Sta,te1s prohibited by AS 46, Chapter 03,
Article 7 and the regu1ations prœulg,ated'thereunder (Title 18" Alas,ka
Administrative Code. Chapter 70) and by the Federal Water Pollution Control
Act. as amended. Prior to ,commencing o,pe,ratlons you may beconta.cted by
a representative of the DepartmentofEn'Vi,ronmentalConse,rvat1on.
"
Pursuant to AS 38.40, toea1 H1;r~ UnderState leases. the Alaska Department
of Labor is being notified of the issuance of this perm.it to drill.
Very truly yours"
(), ¡: g~7'
O. K. Gilbreth, Jr.
Chairman ' ,
A1aska Oil and Gas Conservation Committee
Enclosure
611:blepa:rtment of Fi'sh and t1~mat Habitat Section wIG encl.
Oepartment of Environmental Conservationw/o enc1.
De,partment of labor, Supervisor. Labor lawCompl1ance Division wlnenc1.
ni:t; ~IU\rI
Form 10-401 '
REV. 1-1-71
la. TYPE OF WORK
b. TYPE OF WELL
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR DEEPEN
DRILL [] DEEPEN ['"]
OIL
WELL WELL r'-] OTHER
NAME OF OPERATOR
Cities Service Oil Compang
3. ADDRESS OF OPERATOR
SINGLE
ZONE
1016 W. 6Ch Ave.,. Suite 42.0,,,Anohorage,AK
4. LOCATION OF WELL At surface
1980' FSL & 1980' FWL
At proposed prod. zone
Same
13. DISTANCE IN MILES AND DIRECHON FROM NEAREST TOWN OR POST OFFICE*
50 miles west of Anchoraqe
14. BOND INFORMATION: ' General Insurance
Blanket
TYPE nh-- Surety and/or No. 603-382-223 Company of America
15. DISTAN~/~I~RObl PROPOSED * 16. No. OF ACRES IN LEASE
LOCATION TO NEAREST
(Also to nearest drig, unit, if any) 1980
18. DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT.
39,600
21. ELEVATIONS (Show whether DF, RT, CR, etc.)
15'
1248
l,
19. PROPOSED DEPTH
12,500' TV$
AP I #50-283-20048
6. LEASE DESIGNATION
~: IF INDIAN,ALLO~EEOR
~ ~e~
Wildcat
11. SEC., T., R., M.,
HOLE OBJE~IVE)
Sec. 18-T14N-RSW S,M,
12.
Amount $100,000.
995'01
SUBMIT IN Ti"%"W~CATE
(Other instrt
reverse
17. NO.ACRES ASSIGNED
TO Tills WELL
320
20. ROTARY OR CABLE TOOLS
Rotary
22. APPROX. DATE WORK WILL START
May l, 1975
23. PROPOSED CASING AND CEMENTING PROGRAM
...
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETFING DEPTH Quantity of cement
Driven 30" Sine Piue 40' TVD NO~
26". 20" 94# H-40 350' TVD 630 cu. ft.
17-1/2". 13-3/8" 54.5 ,~ K-55 1980' TVD 2139 cu. f¢.
17-1/2" 13-3/8". 58 #. '. K-55 2400' TVD
_12-1/4" 9-5/8" ~3.5# P-110 2857' TVD ...
12-1/4" 9-5/8" 47# N-80 5560' TVD
12-1/4" 9-5/8" 43.5# S-95 7210' TVD 4529 ft. 3 ~/~ ~ / '
12-1/4" 9-5/8" 47# S-95 10,000' TVD
8-1/2" 7" ,26# S-,95 7,760 TVD 5000 ft.3 ?
8-1/2" 7" 29# S-95 12,500 TVD
, LPR i975
;:Id. e ?" i lcd' , c o3 m .
IN ~O~ SPACE DESC~BE PRO~SED PROG~M: If propoml is to aeepon ~ve aata on present proaucave zone aaa p~o~sea
new proaucave z~neftf~~ to ~ or aee~n a~fion~y, gve pert~ent aa~ on suD~fae~ locations ~d m~sur~ ~d Uue
~rti~t~ ~ ~ ~m pr~t~r pro.am.
24. I hereb~~t the Foredv~ iscT~e~dCo~ck ) ....... aT~.~= a D =
SIG~D" x~ /~~'~ /x,-%~/ DA~ Aprll 11, 1975 ~XLa Drilling Engineer
(This space for State office use)
YES UNO I YES
DIRECTIONAL SURVEY REQUIRED
~ Y~S
CONDITIONS OF APPROVAL, IF ANY:
[] NO
OTHER REQUIREMENTS:
SEE TRANSMITTAL LETTER
A.P.I. NUMERICAL CODE
RMrr o.
APPOVED BY,
APPROVAL DATE,,, ~pF. i, I I ~, 1975
TITLE CHAIRMAN DATE Apr i I
*See Instruction On Reverse Side
15, 1975
I
FLOW LINE
I HYORIL
20"- 2000 PSI
,,
i~~ I1
FROM MUD PUMPS-- SPOOL ~-t VALVE 8~ CHOKE
AUXILIARY KILL LINF~ "~-"AUXIL. IARY CHOKE L'INE
EL J--' -' CSC~
2O"
BOP STACK ARRANGEMENT W/20" CSG. SET L'~ ~500'
CITIES SERVICE OIL CO.
E. L. EWIS RIVER
SEC. 18, T. 14N-R. 8 W
12:,500' WILDCAT WELL
Di¥1SI~.N 0~;' .O:L .AND GAS
BELL NIPPLE
,-,---- FLOW LINE
FILL LINE ---- ~
I
HYDRIL
! !
~' BLIND RAMS Wp'~
13 ~-~ ~! ·
I '1 _
PIPE RAMS
~' 5/8-50~ PS~ wP
K~ILL LINE ~ ~ H~AULIC CHO~E
~.OM MUO .U~.S~ ~7~ I! ~ ~ W/ADJUSTABLE, ~SITIV[ AND
BOP STACK ARRANGEMENT AFTER SETTING 13 3/8" CSG. ~ 24.00'
CITIES SERVICE OIL 'CO,
E.,LEWIS RIVER
SEC. 18, T. 14N-R, 8 W
12,500' WILDCAT WELL
OIL 'ANI) 6A$
/
5
T. 15N.
'TI4N.
I
I
17 I I
I I
I
EAST LEWIS RIVER No. I
LAT. = 61°18'08.06'' I 16 '~1 15
LONG.- 150046'52.07'' I
X= 362,666
GROUND ELEV.= 15 ] - I -
2o I
I f
I
SCALE" I" = I MILE
CERTI. FICATE OF SURVEYOR
that lam properly registered and
26
I hereby certify
licensed to practice land surveying in the State of Alaska and
that this plat represents a location survey made by me or
under'my supervision, and that all dimensions and other
details are correct.
t e ' SURVEYOR
Da
ADDED GROUND ELEV. APR. 9 1975 C.J.R,
i975
Di¥ISD~ 0i; OIL AND (~AS
PROPOSED
EAST LEWIS RIVER No.I
Located in
SW I/4 PROTRACTED SEC, SEWARD MERIDIAN
Surveyed for
CITIES SERVICE OIL CO.
Surveyed by
F.M. LINDSEY I~ ASSOC.
LAND I~ HYDROGRAPHIC SuRvEyo'RS
2502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
SUBMIT IN
Form t0-- 401
R~t/. I--I--71
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR DEEPEN
r
(Other instruct(or,.
reverse side)
IR. TTPR OF WORK
DRILL [~ DEEPEN [-']
b. TYPE OF WRLL
OIL [~ O&, J'~ ,INOL, ~
WELL W~LL OTHER ZONE ZONE
2. NAME OF OPERATOR
Cities Service 0il Company
3. ADDRESS O~ OPERATOR
1600 Broadway~ Colo. St. Bnk. Bldg. ~ Denver, Colorado 80202
4. LOCATION OF WELL At surface
1980' FSL 1980'FWL
At proposed prod. zone
Same
13, DISTANCE IN MILES AND DIRECTION F~OM NEAREST TOWN OR POST OFFICE*
50 m~ les
14. BOND INFORMATION:
?~?~nket Per. Surety and/or No 603-382-223 (Gen.
15. DISTANCE FROM PROPOSED'
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT. 1980'
(Also to nearest drig, unit, if any)
18. DISTANCE FROM PROPOSED LOCATION* D~;~"lri
TO NEAREST WELL DHILLING. COMPL~.
OR APPLIED FOR, ~. 39,600' ~ 12,000T~
ELEVATIONS (Show whether DF, RT. CH, etc.) ~ ~
21.
17-~" 1~-~/8" 68# ~ I J'55 I 2400~ T~ !
1 2 ~" 9-5/R" A7t~
R-I~" 7" 2q#
--
~. LEA.SE D~IGNATION AA~]3 S~-O~L NO.
ADL 58784
?. IF IN'DIAN, AIA23'rr~:~ OR TRIBE NAME
nolle
8. UNIT FARM OR LEASE NAME
· E. Lewis River
g. WELL NO.
No. 1
10. I~IELD AND POOL, OR WILDCAT
Wildcat
11. SEC., T., R., M., (BOTTOM
HOLE OBJECTIVE)
Sec. 18-T14N-R8W S.M.
Co. of America
17. NO. ACRES
TO THiS WI
~ED
)0
'ABLE TOOLS
~ [ N-~ I1 OrthO' TVD.
- ! I~nnn Tvn
N-Sfl [
/75
WILL START*
quantity of cement
_
Dliven ...
2019, Cu,,,, ft,.
I 4523 cu. ft.
i 27tiff r,,. ~t. __ . .
,I
The proposed BOP program is to nipple up a 20" 2000 psi Hydril on. the 20" csg.
when it is set at 300'· After the 13-3/8" is set at 2400' the 'BOP STACK will
consist of a ~000blindPsi Hydril, a ram type preventer withWith killPipe andrams
preventer with rams. Also, a drilling spool
will be used· A choke manifold with adjustable, positive hydraul~q~homes
will be used ( see attached draWings.)
-Ve~ical dep~.~ve ~l~ut preveoter P~gram.
(This space tot S~te offi~ u~) CONDI~ONS OF ~V~, IF A~:
i '
SAMPLm AND CORE CHIPS N.m~ M,U'D LO'G ~ ~U~: ' '
5 Y~ ~ NO D ~ ~ NO
DI~ON~ SURVEY R~~ A.P.I. ~C~ COD~
5 ~ ~NO
P~RMIT NO_ I . APPROVAL DAT~ .....
APPROVED BY, I
*See I.,tn~"lt~.~ O. Reverm Side
--.--- FLOW LINE
HYDRIL
20"- 2000 PSI
KILL ·LINE __..._,~[ DRiLLiNG]-~ 6" CHOKE LINE
-,'---- W/FULL OPENING
FROM MUD PUMPS ~j, SPOOL ,~ VALVE ' CHOKE
I
· ' I ]'"'--- 20" CSG
BOP STACK ARRANGEMENT W/20" CSG. SET 'L"~ 300'
CITIES SERVICE OIL CO.
EAST LEWIS RIVER
1980' FSL 8~ 1980' FWL
SEC. 18, T41N-RSW S.M.
IZO00' WILDCAT WELL
12-16-74
L ~Kr
/.~
I
(
I ,
SCALE: I"-- IMILE
CERTIFICATE OF SURVEYOR
I hereby certify that I am properly registered and
licensed to practice land surveying in the State of Alaska and
that this plat represents a location survey made by me or
under my supervision, (]nd that all dimensions and other
details are correct.
Nov. 29~ 1974
Date
' SURVEfO-R ./..." ~::/'
I
'1" I!')N
1.
I
I
I
I
I
I
I
I
I
I
I
I
II
PROPOSE D
EAST LEWIS RIVER No.I
Loceted in
SW I/4 PROTRACTED SEC, 18, T 14 N..,.R.8 W., SEWARD..,MERIDIAN,AK,
Surveyed for
CITIES SERVICE OIL CO.
I I
Surveyed by
F. M. LINDSEY I~ ASSOC.
LAND I~ HYDROGRAPHIC SURVE¥O'RS
2502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
I I II II I I I I IIII III
CHECK LIST FOR N.EW WELL PERMITS Company ~i,'Tz,C~£' ~!'~/~'~. Lease & Well No.. c-/-~~. L ~cx,~J /~/~,~ ~/
Yes NO ..i Remarks ........... 'z7z- / / - z7 ~-'
1. Is the permit-fee attached ...................... ~
2. Is well to be located in a defined pool .............. ~ ~
3. Is a registered survey plat attached ................ :/~c .
4. Is well located proper distance from property line ......... ~
5~. Is well located proper distance from other wells .......... ~
6. Is sufficient undedicated acreage available in this pool ...... ~K
7. Is well to be deviated ........................
8. Is operator t'he only affected party ................ ~
9. Can permit be approved beforel ten-day wait ............. ~
10. Does operator have a bond in forCe ................. ~
l l. Is a conservation order needed ...... · ........... ~ .
12. Is administrative approval needed .................
13, Is conductor string provided ...- .............. - ....
14. Is enough cement used to circulate on conductor and surface ....
15. Will cement tie in surface and intermediate or production strings
16. ~Will cement cover all known productive horizons ..........
17. Will surface casing protect fresh water zones . . .
18. Will all casing give adequate safety in collapse, tension.& burst
19, Does BOPE have sufficient pressure rating ............
Additional Requirements:
Approval Recommended:
Geology Engineering:
TRM HWK OKG HHH ~_
JAL ~ LCS ~ JCM
Revised 1/15/75
Company C/~i¢s
CHECK LIST FOR NEW WELL PERMITS
Lease & Well No. Y-:. (~,'s Yl,',~ m/
Yes No Remarks
- _
Is well to be located in a defined pool .................
Do statewide rules apply ........................
Is a registered survey plat attached ...................
Is well located proper distance from property line ...........
Is well located proper distance from other Wells ............
is sufficient undedicated acreage available in this pool ........
Is well to be deviated .........................
Is operator the only affected party ...................
Can permit be approved before ten-day wait ...............
Does operator have a bond in force ...................
Is conductor string provided ......................
Is enough cement used to circulate on conductor and surface ........
W'ill cement t.ie 'in surface and intermed.iate or product'ion strings
Will cement cover all possible productive horizons ...........
Will surface casing cover all fresh water zones ............ ,~'-
Will surface csg. internal burst equal .5 psi/ft, to next string ....
1. Will all casing give adequate safety in collapse and tension ......
). Does BOPE have sufficient pressure rating ...............
ii
tional Requirements'