Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
162-032
Division of Oil and Gas Well Activity http: / /www.dog.dnr.state nns/ oil /produ...11s /well_data.asp ?Selection = 5000910021( 161�a S td tg .... iugU ._ ....._._. r 1UgiJ °_____ ._ State of Alaska Division of Oil and Gas Department of Natural Resources Well Data For Alaska EUREKA 2 Active Well Details API Number: 500091002100 Permit Number: 1620320 Operator: ALEDO OIL CO Permit Date: 11/1/1962 Well Name: EUREKA f Status: P &A Well Number: 2 Com letion Date: 5/6/1963 Well Basin Area COPPER RIVER BASIN Total Depth: 8546 Codes Lease: EUREKA ( True Vertical Depth: 8546 Surface Latitude: 61.95496 Bottom Latitude: 61.95496 _ Surface Longitude: - 147.12701 Bottom Longitude: - 147.12701 Surface MTRS Location: Copper River, T2N R1OW 18, 1629 S 0 W Bottom MTRS Location• Copper River, T2N RIOW 18 1629 S 0 • W Maintained By: Tim Ryiierd , f].CYSE „a,.w _... • �' a . w , MAy 2 2 2D 1 of I 7/24/03 12:44 PM r Ic -ar[m 10jan95 LOCATION CLEARANCE REPORT State of Alaska OIL AND GAS CONSERVATION COMMISSION PTD No. �°p -4-2.3 0 5(23 i1 `/ Memorandum To File: API No. 7 / �J / 0 v Well Name f- A ,\ Operator / E • Location S 1 ' - l` 1.) SS Abnd Date A &-j Spud:-2S 0(44' 2- TD: Completed ; 5 A p (<3 Note casing size, wt, depth, cmt vol, & procedure. Sfc Cog: S -- 5X / , go, I 7.5 c5 S Long C8g: Liner: Perf intervals - tops: _ - Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear. code. Plugs: 7f X 30 - ' S-V` 2.5 sic $ pf Well head cut off: -- Marker post or plate: . / _S Top E' 1 �.� I AA A Location Clearance: _ Conclusions : Pro pr0A y 0/771' Code Signed /, 1 1 Date __ , le . . Iti P LUGGING RECORD ; Operator Address __ Aledo 011 Co. I 750 W. 5th St. Ft. Worth 2, Texas 1 .-- Name of Lease s. Well No. Field & Reservoir 1 A 023423 Eureka I 2 ( Wildcat Location of Well Sec - Twp-Rge or Block & Survey County 1629' N of SW corner Sec 18, T 2 N, R 10 W, CRM / pplacation to drill this well was filed Has this well ever Character of well at completion (initial production): In name of produced oil or gas Oil (bbls /day) I Gas (MCF /day) I Dry? • A 011 Co, No }; 1 Date plugged: Total depth Amount well producing when plugged: Oil (bbls /day) Gas (MCF /day) Water (bbls. /day) April 5, 1963 8546' None I None I None Name of each formation con- Fluid content of each formation Depth interval of each formation Size, kind & depth of plugs used • taming oll or gas. Indicate Indicate zones squeeze cemented, which formation open to well- giving amount cement. bore at time of plugging None None 75 sx of cement bottom at 875' 25 sx of cement, bottom at 20' CASING RECORD Size pipe Put in well (ft.) Pulled out (ft.) Left.in well (ft.) Give depth and Packers and shoes method of parting casing (shot, ripped etc) . 10 3/4" 836 0 836 Halliburton float shoe 7" 5174 2800 2374 shot Halliburton self fill up shoe Was well tilled with mud -laden fluid, according to regulations? Indicate deepest formation containing fresh water. Yes None NAMES AND ADDRESSES OF ADJACENT LEASE OPERATORS OR OWNERS OF THE SURFACE Name Address Direction from this well: Aledo Oil Co. & partners 750 W. 5th St. Ft. Worth 2, Tex. All directions In addition to other information required on this form, if this well wa plu b for use as a fresh wat well, give all pertinent details of plugging operations to base of fresh water sand, perforated interval to fresh water sand, name and addr of surface owner and attach letter from surface owner auorizing completion of this well as a water well and agreeing to assume full liability for any subsequent plug- ging w m ight b e requ th Use reverse side for additional detail File this form in duplicate with the Commission. CERTIFICATE: I, the undersigned, state that I am the agent - of the Aledo Oi 1 (company), and that I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to the best of my knowledge. J/ _ -) 1. is V "-f,.1, /.2.--v'' j.-- ' * RECEIVED Signa re '"�-,� {a - AildP..',d!'. -, AlLskd - f Alaska 011 and Gas Conservation Commission APRAPR 1963 Plugging Record J Form No. P45 Authorized by Order No. 1 Division of Mines and ' \1inci, 1 Effective October 1, 1958. _.— .Tacks 41.. ni-N tula is 111/ 94 ALEDO #2 EUREKA - Well History Page 5 3/19/63 drilling at 8110 in conglomerate, deviation 7 3/20/63 t, " 8134 " " 1, " 3/21/63 " " 8158 " " " 6 -7/8 3/22/63 " " 8181 " " " 7 3/23/63 " 8216 " " " If 3/24/63 If " 8242 „ „ „ " 3/25/63 8266 " „ It 7 -1/8° n 3 11 „ 8290 „ II 11 It 0/26/60 3/27/63 ” " 8317 " " 7 -1/2 3/28/63 " " 8341 " " 7 -1/4 3/29/63 " " 8366 " " " 3/30/63 " " 8397 " 11 II 11 3/31/63 " " 8435 " " " It 4/1/63 " " 8479 " " " 4/2/63 " 8514 " It It " •4/3/63 drilled to 8532, rigged up Schlumberger and ran logs, gamma ray neutron from 0 to 5300', IES and continuous dip meter from 5178 to 8532. 4/4/63 ran diamond core bit and cored from 8534 to 8546.5 T.D. and began pull- ing core. 4/5/63 recovered 100% of core, hard silicified conglomerate, basement, layed down drill pipe, ran free point on 7" csg, free at 2775, partially stuck at 2800 and stuck at 2850', shot off at 2787 and began pulling 7" csg. 5/6/63 finished pulling 7" csg, set 75 sxs cement plug at 930', top of plug 80' up inside 10 -3/4" surface csg, 25 sxs cement plug in top of 10 -3/4" csg and cellar, sign welded to top of 10 -3/4" csg on 5' of 3" pipe as marker. P & A , • Files October 4, 1963 Z - 3 ( . W. C. Wunnicke i/k I Field Inspection of abandonment and clea n up. Aledo Oil Company, 1 Eureka 02. I Subject well location was inspected October 2, 1963 by Messrs. Soyster and Wunnicke. A satisfactory monument had been installed on the well, however, the top of the monument bad not bee, plugged or covered. T'ne cellar bad Leen 2illr.d and a contractor - 1 eekin Contractor, Mile 110 Glenn Hwy. - was levclip.g the location, burying debris and filling the reserve pits. The Contractor plan - ^.d. to break down the wall on the lower side of tha re :ervc pit and push it i: the resci:ve i pit to cover the rc a1ninv mud. The plan of operation appeared satisfactory. u C.-'Wunnicke WCWdunnicke:MHSoyster: dmc :10/9/63 . Form (A �952) • UNITED STATES • Sec. 18 DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY T 2 N CONSERVATION DIVISION R 10 W INDIVIDUAL WELL RECORD Copper River Mer. PUBLIC LAND: Date_ Apx 3__25_,__19G3__ —_ Ref. No. Land office Anchorage State _ Alaska Serial No. 023423 -A — ___ -- may _QQ.pp_ex River Lessee A1edQ_ QL__CQA?Pany_,__ Field Eux_eka__IJnit Operator Aleda__0 1__Company_,_snc, _______ District ___Alaska RPg3 nn Well No. Eureka #2 Subdivision NWSW Location 1629' from South line and on the West line of section 18 Drilling approved , 1962____ Well elevation _3375 feet Drilling commenced ____NQx.,1 , 1962_ Total depth ___ 8546 - '__ — feet Drilling ceased April_ _5 , 1963_ Initial production ______Nnne - - -- P&A ggtiraxH April 5 , 1963 Gravity A. P. I. Abandonment approved f / ' , 19. ' ' Initial R. P. Geologic Formations Productive Horizons Surface Lowest tested Name .Depths Contents - aitaeaQUa .Iuxa i�_ Vol�aa[iiea . - NQne -_ WELL STATUS --------------- ---- YEAR JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. Nov. DEC. 1962 Drg Drg 1963 Drg Drg Drg P&A REMARKS 1st test under Eureka unit agreement Csg: 10 3j4" @ 836' w/650 sx; 7" @ 5174' w /100 sx. Hole sloughed badly throughout. Encountered Talkeetna Volcanics at approx. 5200' & bottomed in same. Pulled approx, 2800' of 7" & abandoxied_4!_5163, '<1 1 • U. S. GOVERNMENT PRINTING OFFICE 1O - 38057 - 4 COMPLETION SHEET roan 9-503 • (April 1052) • DEPART PIF 17 I NTA R UNITED STATES 18 • Sec. GE.OLOG:CAL SURVEY CONSERVATION DIVISION 10 VI R. _ INDIVIDUAL WELL RECD Copper River m or. PUBLIC LAND: DateAm:11_25_,__1163 Ref. No. Land office Anchorage State A Laska Sai-ial No. 02303-A Ctr _____C.orip_e_r__Rimer Lessee Field _____LEmieka_ilnit_ Operator ___Ale,da_Ca_Corap.any„Lne_.____ District A1ps1.7p Roginn Well No. Eureka #2 Subdivision INIAST;lk, Location 1629' from South line and on the West line of section 13 Drilling approved 1952_ Well elevation ___33251._1:1_ feet Drilling commenced 19.62_ Total depth foot Drilling ceased April _5_ , 19.6.3._ Initial production one P6A • X24f =Et_ 4.2ril 5_, 19 6 3 Gravity A. P. I. - / 3 Abandonment approved - , 19- Initial R. P. Geologic Formations Productive Horizons Surface Lowest tested Name .Depas Contents Jure.aalo_VoLomic_s_ _None VELL STATUS YEAR JAN. FEB. MAR. APP.. MAY Jum; JULY ATIO. SEPT. OCT. Nov. DEC. 1962 Drg Drg 1963 Drg Drg Drg P&A 1st test under alreka unit asreement Csg: 10 314" @ 836' w/650 sx; • REY4RT-r8 7" @ 5174' w/100 sx. Hole slouched badly throughout. Encountered Talkeetna Voicanics at a-.)prox. 5200' & botto-:aed in same. Pulled approx. 2800' of 7" & e:ualdsma6-415/63. COYIRNNENT PRINTING OFYICC 16-38047 COKPLETION SHEET • Form approved. Budget Bureau No. 42-R355.4. Form 9 -330 U. S. LAND OFFICE Anchorage SERIAL NUMBER A 023423 LEASE OR PERMIT TO PROSPECT Lease UNITED STATES ' lE DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY i , LOG OF OIL OR GAS WELL LOCATE WELL CORRECTLY Company Aledo 011 Co Address 750 W. 5th St. lit. Worth 2, Texas Lessor or Tract Alecto Oil Co. Field Wildcat State ___ AlafiK& Well No. ____2_ Sec. __111 T. 2-N_ R.l.Q_ WMeridian __ Cnpper_Biver____ County Location 1628 ft. I }of _3___ Line and _ON_ _A. I ofxxxx. Line of __ Sec-tion_ Elevation 3325 k B (Derrick floor relative to eea level) The information given herewith is a complete and correct record of the well and all � work done thereon so far as can be determined from all available records. j ' S ^` Signed l.a ✓_ _ "._ ..., t., !e Date April 16, 1963 Tide / Agent The summary on this page is for the condition of the well at above date. Commenced drilling October . 28 , 19__ 02 Finished drilling .Ap.ril 5 ..__, 19__.63 OIL OR GAS SANDS OR ZONES (Denote gas by G) No. 1, from None to No. 4, from to - No. 2, from to _ No. 5, from .. to No. 3, from to _ No. 6, from to IMPORTANT WATER SANDS No. 1, from ___!One ____________ to No. 3, from to No. 2, from to _ No. 4, from to CASING RECORD Perforated Oise \Velght Threads per casing per foot inch Make Amount Hind of shoe Cut and pulled from Purpose From— To- 10 t. • _31.4.7__ 48 -- .b - -- •- -- - N.a. 1 = '1526_/:•_1.../.104-t] i 7" �-- - •- - , . �. L i, ,, .,.,'. , Attie *CO -pipe • - ►iini. f , - - 6 1 7 4 is -- ,. 4.1- -ing - °2800 :intermediate MUDDING AND CEMENTING RECORD ■ Size Where set Number sacks of cement Method used Mud gravity Amount of mud used casing - 1a -3,14" -836-' a1 iburt ©n y r 7" - 5-1'4' 1- vs Q J 0 ' PLUGS AND ADAPTERS W Heaving plug — Material Length __ Depth set Adapters — Material Size • SHOOTING RECORD Mae Shell used Explosive used Quantity Date Depth shot Depth cleaned out -' ( ' _ • l .1 _S .. /.. ( l „ ; \ 1 , \ , - .. ` (i- l ..yi • ( TOOLS USED Rotary tools were used from 0 feet to __ 8546.____ feet, and from feet to ____ feet Cable tools were used from feet to __.- feet, and from feet to __ feet DATES ,19 ■ Put to producing , 19 The production for the first 24 hours was barrels of fluid of which ___ was oil; ___- _____% emulsion; ______% water; and % sediment. Gravity, °Be. If gas well, cu. ft. per 24 hours Gallons gasoline per 1,000 cu. ft. of gas Rock pressure, lbs. per sq. in. ' EMPLOYEES - -- Bruce - -limes- , ai& Superintendent- -- - - -- , Driller ___Ralald_Disauluier5 Tool Pusher , Driller FORMATION RECORD FROM— TO— 1 TOTAL FEET FORMATION ' 0 I 147 ; 147 Boulder clay 147 ; 4084 ! 3937 Shale 4084 4433 349 Silty shale 4433 4905 472 Sand, shaley and silty 4905 4955 50 Green to gray shaley sand 1 4955 5135 180 Brown silty shale 5135 5365 230 Conglomerate 5365 ' 5575 210 Silty shale, siltstone and conglomerate 5575 5885 310 Siltstone & shale 5885 6150 265 Sandy shale & graywacke 6150 ! 6400 250 I Conglomerate & siltstone 6400 6570 170 Gray shale with conglomerate stringers 6570 7030 460 Conglomerate, slightly silty to sandy 7030 7065 35 Dark gray shale 7065 7135 70 Hard dark gray sand & siltstone 7135 7265 130 Conglomerate, sand & siltstone 7265 7310 45 Silty, dark gray shale 7310 7415 105 Conglomerate 7415 .7500 85 Black shale & tuff, much slickensides & gouge 7500 .7635 135 . Conglomerate, sand & shale ' 7635 7785 150 Dark' gray ,Shale &• black sand with conglomerate inelusibns - — --- --- -'- -- -- - - - - [OVER1- -- -. 1e- 43094 -5 • f RECORD -- Continued FROM- TO- TOTAL FF.1 T I' FORMATION 7785 8300 515 Brown & - Nark gray shale; conglomerate & ... siltstone, tuff*ceoua 8300 8544 244 Conglomerate df volcanic'debris, slightly altered 8544 8546 2 Greenatone - - ' i ' 1l . • • • • . • . tacmi-a r.ovi num to rnturitiG m I vs. HISTORY OF 011. OR GAS WELL It is of the greatest importance to hnve n complete history of the well. Please state in detail the dates of redrilling, together with the reasons for the worlt and its results. 'If there were any changes made in the casing, state rnll and if any casing was "sich•tradced" or left in the well. give its size and !citation. if the well has been dynamited. give date, size, position, and moldier of Allots. I( pings or bridges it ere put'lli to test for water, hind of material used, position, and results of pumping or bailing. ANCI-lO , • Budget Bureau No. 42-R358.4. ■ Form 9-331a Approval expires 12-31-60. (Feb. 1961) Anchorage (SUBMIT IN TRIPLICATE) Land Office t A 023423 U NITED Lease No. or, D EPARTM ENT OF THE STATES I NTERI OR Unit__ y�_ }__ _��t t ' 1 1 • GEOLOGICAL SURVEY ! SUNDRY NOTICES AND REPORTS ON WEL .(S � DIvisign c _1! ;) {:1CC.A,Ti SU13 YEX 11.4 t. -, 2, aska NOTICE OF INTENTION TO DRILL SUBSEQUENT REPORT OF WATER SHUT -OFF NOTICE OF INTENTION TO CHANGE PLANS SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING_ NOTICE OF INTENTION TO TEST WATER SHUT -OFF SUBSEQUENT REPORT OF ALTERING CASING NOTICE OF INTENTION TO RE -DRILL OR REPAIR WELL SUBSEQUENT REPORT OF RE- DRILLING OR REPAIR NOTICE OF INTENTION TO SHOOT OR ACIDIZE SUBSEQUENT REPORT OF ABANDONMENT NOTICE OF INTENTION TO PULL OR ALTER CASING______________ SUPPLEMENTARY WELL HISTORY__.. NOTICE OF INTENTION TO ABANDON WELL (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) Jpril 16 63 ,19 Well No. 8 is located ` ft. from } line and � . ' ro m WJ � line of sec. dg 10 C W (X Sec. and See. No.) (Twp.) (Range) (Meridian) Wildcat Alaska (Field) (County or Subdivision) (State or Territory) The elevation of the derrick floor above sea level is d ' ft. k g• DETAILS OF WORK (State names of and expected depths to objective sands; show sizes, weights,,and lengths of proposed casings; indicate mudding jobs, cement- ing points, and all other important proposed work) T.D. 111546. 110 shoos. Ito i;t of ow .piled. 7" cog. coraestimi at 6174 was shot ofi at ' ind NW was palled. 101* was filial with heavy sod and a 74 soak cement plug was set at *278' esteisitsig tato the bare et the 10 3/4" cis set at 330'. A ild sack sweat plug was est at SO' in the toy of the 10 3/4" on and partially tilling the cellar. A savior was welled to the top of the 10 3/4" surface ass. AI'PROVEll.. , Regional Oil at: G S)porvi r I understand that this plan of work must receive approval in writing by the Geological Survey before operations may be commenced. Company Aled° Ail 00. Address MO W 5th 5t. *t. Worth d, Texas B - . (. z Title ____. ASOlt GPO 862040 Ii , f I � Budget Bureau No. 42- R368.4. _f • Form 8 -881a t �- J T Approval expires 12-31-60. (Feb. 1951) j�j'i 1 1 19(i3 i ; (SUBMIT IN TRIPLICATE) Land Office Col: Oj ( ; ii n c >i v,,1j ITED STATES Lease No. A 033433 - 4 L.'S. GEOLOGICAL S Uli Ae Eureka 14 - - -- Auchora8DEBARTMENT OF THE INTERIOR Unit GEOLOGICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL SUBSEQUENT REPORT OF WATER SHUT -OFF NOTICE OF INTENTION TO CHANGE PLANS SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING _____ ______ _____ NOTICE OF INTENTION TO TEST WATER SHUT -OFF SUBSEQUENT REPORT OF ALTERING CASING . NOTICE OF INTENTION TO RE -DRILL OR REPAIR WELL SUBSEQUENT REPORT OF RE- DRILLING OR REPAIR . NOTICE OF INTENTION TO SHOOT OR ACIDIZE SUBSEQUENT REPORT OF ABANDONMENT NOTICE OF INTENTION TO PULL OR ALTER CASING SUPPLEMENTARY WELL HISTORY__._ NOTICE OF INTENTION TO ABANDON WELL Y • (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) April d , 19 $3 Well No. 2 is located lei ft. from lJ line and ___ on_ __itfocietem'{e • line of sec. 18 3 N 10 g CR (j Sec. and Sec. No.) (Twp.) (Range) (Meridian) Wildcat - -Aliwk ! (Field) (County or Subdivision) (State or Territory) The elevation of the derrick floor above sea level is 3325 ft. CB. DETAILS OF WORK (State names of and expected depths to objective sands; show sizes, weights,, and lengths of proposed casings; indicate mudding jobs, cement- ing points, and all other important proposed work) Operator will pull as much 7" esg. as possible and till hole with heavy crud. A 7$i sack cement plug will be set straddling base of 10 3/4" casing at 838' and a 25 sack cement plug at top of casing. Added by 6,5.6,5. 1 7" csg @ 5178'. T.D. 8546', operator reported orally that Talkeetns volcanic. encountered at approximately 5200' and hest bottomed in same. No shows through- out test. Please note the attached requirements. APPROVED, J ' ?CT TO ATTACHED Jar JTI', MENTS • 1 . ;�- - .„all ,_ fi t / � ' - 4 1 2 OIL L CAS SUPEn BOB, ALASKA REGION 1 understand that this plan of work must receive approval In writing by the Geological Survey before operations may be commenced. Company Aloft all Calt1 Address 750 Vest 5th Street I Pt. Worth : , Texas By �.CX7-- ,ic -(1/ ee-- I Title ____.Ag•t GPO 862040 A bdo Oi Company But�eeca Company P y Location Well No. 2 Lease No. A-023423 Your proposed plan of abandonment is approved subject to following conditions: 1. Compliance with Federal Oil and Gas Operating Regulations. 2. Changes in approved program must receive prior approval of the District Engineer or the Regional Oil & Gas Supervisor. 3. Oil or gas zones either previously productive or correlated with produc- tive zones must be protected by adequate cement plugs. 4. That portion of the hole between cement plugs shall be filled with heavy mud fluid. Top of the hole shall not be closed until the District Engin- eer or the Supervisor has been given an opportunity to inspect it. 5. Abandoned wells shall be marked with markers consisting of a pipe not less t than 4 inches in diameter and not less than 10 feet in length, of which 4 feet shall be above the general ground level and the remainder embedded in concrete. The top of the pipe shall be closed with a cap or cement plug and the marker should show in a permanent manner the name of operator, well number and location. 6. Equipment and valuable material shall be removed from the well site or dis- mantled and arranged in an orderly manner; junk and debris shall be removed or destroyed; pits and cellars shall be filled and leveled and the well site, including sumps, shall be placed in a clean and orderly condition. 7. The hole should be converted to a fresh water well if practical. 8. A subsequent Report of Abandonment on Form 9 -331a, giving a detailed ac- count of all work performed, including location of cement plugs, casing pulled, casing left in the well, date of placing surface plug or cap, shall be filed in triplicate, within 15 days after completion of the work and the District Engineer or the Supervisor shall be notified when the well site has been cleaned up and is ready for inspection. Mailing Address: Office Address: U. S. Geological Survey Room 505, Cordova Building Box 259, Anchorage, Alaska Phone: Office BR -50511 Nite: BR -49141 FE -34722 ei Form approved. N -- - .N Budget Bureau N om. 42- RS66.6'. • • UNITED STATES _.NO OFFICE /gilt- t- kOf "% ' ' " ] " , �� DEPARTMENT OF THE INTERIOR LEASE NUMBER _":"....1-: __ GEOLOGICAL SURVEY UNIT LESSEE'S MONTHLY REPORT OF OPERATIONS State 4 t #1544 County , Field Wit -- 1.14 f The following is a cor,rectreport of operations and production (including drilling and producing wells) for the month of i�'I- 6 et 4 1 , 19_ (0,4 .agent's address /'`� ° 1. e S i" -5 - 3 f ifi,� f Company _ LI ste V 41- i.: ;,/ -'1714'1 � ,,,/:. r ie.T1) ( ` / ,- A°"f rS Signed Z07" - ` - "C C . y D--_sL--- Phone cr agent's title '/ r SEC AND WELL Dnsa CU. FT. OF GAS GALLONS OF BARRELS OF REMARKS tt// TwF. RANGE BARRELS OF OIL GRAVITY GASOLINE WATER (If (If drilling, depth; if shut down, cause; RECOVERED none, s0 state) IQ in ]k NO PNODIICP.D (In thousands) date end result of teat for grmolin content of gas) el i I I aa f" h j -C IL Is pg ,47 I/400 j I irl f' /' R , ‘: 61,3 c i, - , I F t ; 0 - I. MAR 8 1963 t v Zi' Conservation Division --- 1 IJ S. GEOLOGICAL SURVEY Anchorage, Alaska NOTE. —There were d runs or sales of oil; X0 M cu. ft. of gas sold; !Jf_�� 0 _ runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.— Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 8-829 16 - 9 0. S. GOVERNMENT PRINTING OFFICE (January 1950) Budget Bureau No. 42- R368.4. • Form 8 -831a Approval expires 12-31-60. (Feb. 1951) �/ (SUBMIT IN TRIPLICATE) Lend Office _!11U / R!�(b { Lease No. A 0.a - 5 V 3 f.l 1 1 UNITED STATES te E4/4 DEPARTMENT OF THE INTERIOR Unit x GEOLOGICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL SUBSEQUENT REPORT OF WATER SHUT -OFF NOTICE OF INTENTION TO CHANGE PLANS I SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING NOTICE OF INTENTION TO TEST WATER SHUT -OFF SUBSEQUENT REPORT OF ALTERING CASING . NOTICE OF INTENTION TO RE -DRILL OR REPAIR WELL SUBSEQUENT REPORT OF RE- DRILLING OR REPAIR________________ _____ NOTICE OF INTENTION TO SHOOT OR ACIDIZE SUBSEQUENT REPORT OF ABANDONMENT NOTICE OF INTENTION TO PULL OR ALTER CASING___ SUPPLEMENTARY WELL HISTORY NOTICE OF INTENTION TO ABANDON WELL Su - a, - - 'Y' Na, �i. e (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) w A. ;I"Bt, p.-J13. �' , 19 63 M Well No. ____ is located 1629 _ ft. from {iine and On ft rom W l of sec. 18 2N lOW Copper River (X Sec. and Sec. No.) (Twp.) (Range) (Meridian) Ary e.zt -.r Al aska► ~r (County or Subdivision) (State or Territory) The elevation of the derrick floor above sea level is __33_25__ ft. APProx. DETAILS OF WORK (State names of and expected depths to objective sands; show sizes, weights.,and lengths of proposed casings; indicate mudding jobs, cement- ing po ints , and all other important propo work, To elimenate caving and keyseating in the hole it is neccessary to run a string of casing. 7". N-.80 23# L T&0 8rd, Thd. Run to approx. 5200 ft. and cement mith 100 sacks cement, � � 7 'r '! r r FEB 8 s ^; Arrni.0 vEO...._..... ' Fr n 8 1963 ; ( :' l �: ('Ct3 neriisor f oil Division f ion (l as 1: 8: t'sECLCG!C 1T.. �. URVEY Anchorage, Alaska I understand that this plan of work must receive approval In writing by the Geological Survey before operations may be commenced. Company _ - -- - - - - - .l edo Oil 00 Address 750 Wast . th, Street 'Qrt__WQri h, Texas B c.1.e14, '":."!E -- 1 .- -A., Title - - -- Superintendent GPO 862040 Form approved. Budget Bureau No. 42- R356.5. • UNITED STATES LAND OFFICE 4 • DEPARTMENT OF THE INTERIOR LEASE NUMBER _ C'' S X517 5 /l GEOLOGICAL SURVEY UNIT • - i LESSEE'S MONTHLY REPORT OF OPERATIONS State Al a "• County Field Wildcat The following is a correct report of operations and production (including drilling and producing wells) for the month of Jru!?'• , dlbent's address __7�iP__;��:;�_, t:•.^,__raTr���t Company ___A1.91o_01- 2._S9Li! .tV Fort Worth, Ta.' =us Signed _ . ,tip c -e ___ Phone Edison 5 -12"5 ✓lgent's title Sul`'erinten_ dent GALLONS Or BARRELS or REIVIARKB BEfi. AND , WELL Dsae GII, FT. Of GAS (I[ drD death; if shut d oara, cause; min. RANGE NO. Paaoacno ( BARRELS Of OIL GRAVIT thousands) QA30LSI WATER If date sa d result of teat for OP easafias RECO`ERED � none sEo Sta(te) content of east 18 2N 10i1 2 Eureka This - w e l l driller. to 6695 ft. 1141e caving very ball, Ran 517 ft. 7t Casing 1 ed with 1C0 sacks ti3at cement. N• r ti)OCe [ n c� 7Gt� i FEP, t) 1 �I j , . :'. ,... ,,. • . i � +!l •J r 1 `7 y t , °TAU FE : Ti 183 193 • .ef Ira • /11,,; xr ua S, c; , SUANT Alas k2. • - F NOTE. —There were 110__ runs or sales of oil; No M cu. ft. of gas sold; 1?O runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE. -- Report on this fortn is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Fort. 9 -329 (January 1950) te 257609 U. S. GOVERNMENT PRISTINE; MICR II ' ! Lin L ] Li eJ E 0 `�' C J t> Apprro expires 12-31-60. 42-R356.5. -, D ` ✓ UNITED STATES LAND OFFICE JAN 8 jg '� DEPARTMENT OF THE INTERIOR LEASE NUMBER 7- z/ —3 c UNIT_f GEOLOGICAL SURVEY lt ?txl?RS: t� ur& C K.A V,v, Conservation U• S• GEOLOGICAL • Anchorage, Alas tESSEE'S MONTHLY REPORT OF OPERATIONS State Atuke County - Field Wildcat • The following is a correct report of operations and production (including drilling and producing wells) for the month of December , 19 62, .!gent's address 750 West 5th. Stre Company f ^Aledo Oil Com an r Fort WQrtkx., -- .Tees Signed 1 rAL_� .c- � —i ,: c'i�.. Phone Edison 5 - 1205 .agent's title Su gr .ntafl i 9sc. AND Wstt a.:■ 7111; FT. or OAS GALLON Or BARRELS Or REMARKS Twr. RANGE BARRELS Or OIL GRAVITY GASOLINE WATER (II (1I drilling. depth; if abut down. cause; or I/j No. Pnonpc■p tLo RECOVERED none, so state) d ate and reeontensult o t f o[ ■as) trft for gasoline 18 2N lOW 2 peke Yhis well is still dz'illir.g at 6527 A. • • ri al ' ED s. AN la 1963 a i 't , .'-• 1 ,,,‘ , - • NOTE. —There were N o runs or sales of oil; N o M cu. ft. of gas sold; NO runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.—Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 9 -529 (January 1950) 16- 25766 -S u. s. GOVERNMENT PRINTING OFFICE Form approved. Budget Bureau No. 42- R356.5. C l' ? �_�, UNITED STATES • LARD OFFICE 1 ' 4 • i : j DEPARTMENT OF THE INTERIOR SSE NUMBER - a DEC 5 1962 GEOLOGICAL SURVEY UNIT L - C(;ns�rvat_on D=L~ ES FEE'S MONTHLY REPORT OF OPERATIONS U.S. CrOLOC' CAL SUti • Anchorage, Alaska State A ,gla.=ka County - -- Field ____Wildcat The following Is a correct report of operations and production (including drilling and producing • Wells) for the month of . NS2V ° 1'- 1 ? _ ' • x , .agent's address,,750 t1 st 5th. Stre -t Company Aledo Qil 0011.1— Fort Worth Texas � Signed � -� 1 ::.��. ��� ....� - -�- =• = - -f - - -- Phone Edison 5 -126 .-4sent's title _ $ukerintendent SEC. Am) WELT. Dsrs CU. T. OF 03.19 GALLONS OF BARRELS OF REMAR)LS TWF RANGE BARRELS OF CIL �3RAV TY CASO\E WATER (If (1( drilling of test for gasoline , devth; I( shut down, en•.ue• Ya Or No. Paooecan (In theim Dd3) date and RECDYE IIOIIO SO State) content of goo) 18 2N 2 yurek T his tTell spucded vem'oer 1, i 1962 at 1 :30 Pile Set 83 ft, 10 3/4" 487E J-155 casin . Cemente with 650 sacks Regular cement. Cement circulated t) to t s - 'face, W C for 211 `lours Tested surface caiing and circulated otrout •reve ter to 1500/ PSI for 3' lan tes No leaks, r •Vr • Ming 8 '3/11.1 hole 4t l014 Ft, in sandy she : =e Dec. 1, 1962 t i Q 1 DEC 5 1N At. II. cL4is:cr • ' I I NOTE. —There were llo runs or sales of oil; No _ M cu. ft. of gas sold; runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.— Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Form 8 -329 16- 25760 -9 a. S. GOVERNMENT PRINTING OFFICE (January 1950) r.. 11111:H0 4F Budget Approved. 42-R358.4. • ' • Form 94)81a • . -.. (Feb. 1951) Anchorage Land (SUBMIT IN TRIPLICATE) Offico 023423 \ - -- Lasso No...... UNITED STATES DEPARTMENT OF THE INTERIOR Unit I\I • e) GEOLOGICAL SURVEY ■ 1 t csa CT) SUNDRY NOTICES AND REPORTS ON WELLS c--4 'Nt.,: 1 , a 1 ...-- NOTICE OF INTENTION TO DRILL SUBSEQUENT REPORT OF WATER SHUT-OFF JD NOTICE OF INTENTION TO CHANGE PLANS ‘, X SUBSEQUENT REPORT OF SHOOTING OR AC1DIZING_____ -'; % , ,i ----- ----- - NOTICE OF INTENTION TO TEST WATER SHUT-OFF SUBSEQUENT REPORT OF ALTERING CASING N I 0 I --i NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR_ - I "g . C I NOTICE OF INTENTION TO SHOOT OR ACIDIZE SUBSEQUENT REPORT OF ABANDONMENT \ 0 NOTICE OF INTENTION TO PULL OR ALTER CASING SUPPLEMENTARY WELL HISTORY \1/4 ''• . 4.) NOTICE OF INTENTION TO ABANDON WELL (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE, OR OTHER DATA) .. November 5 , 19 62 ....- Well No. 2 .. is located 1629 ft. from r line and on ftsinunr of sec. 18 - ..3 ....-- i 18 2 16 W CR ()j See. and Sec. No.) (Twp.) (Range) (Meridian) W.i.lsicat _Alaska. (Field) (County or Subdivision) (State or Territory) ." The elevation of the derrick floor above sea level is 3325 ft. K.B. approx. DETAILS OF WORK (State names of and expected depths to objective sands; show sizes, weights„and lengths of proposed casings; Indicate mudding jo).s, cement- ing points, and all other Important proposed work) 10 3/4", 48 lb. surface casing to be set at 836 account of caving boulders. Cement will be circulated. NOV 9 1962 U.S. GEOLOGICAL SURVEY AI ,-.1-0 I understand that this plan of work must receive approval In writing by the Geological Survey before operations may be commenced. Company Aledo Oil Company Address ' 750 W. 5th St. • • ^ C C Ft. Worth 2TQxas By --- vraniie -- BracTle Title Agent GPO 914974 ti ,r: r'� ' r t r' 1 � � ° C Budget Bureau No. 44- R358.4. ) } _ l 3 L :j Form Approved. , tame ! -> ila 11 (Feb. 1961) 3 <...-1 Land Office Anchor:me • (-9 OCT 1 62 (SUBMIT IN TRIPLICATE) CO UNITED STATES 1.aaallo. ....(_24.4L�___________ .S. C OLOG SUR' EY • unit EnxeIaa .... -_l ___,.RTMENT OF THE INTERIOR r (NI . • _c,'lazaga, ) GEOLOGICAL SURVEY, • w -, • . SUNDRY NOTICES AND REPORTS ON WELLS .j o ,. �� N NOTICE OF INTENTION TO DRILL * .k _ SUBSEQUENT REPORT OF WATER SHUT -OFF , NOTICE OF INTENTION TO CHANGE PLANS • SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING __- .___ —� + 4 NOTICE OF INTENTION TO TEST WATER SHUT -OFF SUBSEQUENT REPORT OF ALTERING CASING • NOTICE OF INTENTION TO RE -DRILL OR REPAIR WELL SUBSEQUENT REPORT OF RE- DRILLING OR REPAIR.._____________ • NOTICE OF INTENTION TO SHOOT OR ACIDIZE • SUBSEQUENT REPORT OF ABANDONMENT — \ f NOTICE OF INTENTION TO PULL OR ALTER CASING__ SUPPLEMENTARY WELL HISTORY J <) 0 NOTICE OF INTENTION TO ABANDON ' i • i J.- ; N r' g • (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER DATA) f:7 U ] October 17 • - 2) C f C9 , Well No. 2 is located located ft. from 1 J line and on �� lilt 1 JJ fiViiii } Iine of sec. 1 `S 2 ii 10 W Copper River 0 (3 See. and Sec. No.) (Twp,) (Range) (Meridian) • Wildcat Alasta • (Field) (County or Subdivision) (State or Territory) The elevation of the derrick floor above sea level is 3323 ft. approx. DETAILS OF WORK (State names of and expected depths to objecands; sho sizes, eht tga�andt ngths f o proposed casings; indicate mudding job., cement. iting ve po an d all other w important pr work) Nelcbina lime and and 5500 to 0000, Jurassic sands between 6,000 and 6,000. ' Will drill 15' hole to 1200' and set approx. 1200' of 10 5/6" 43 lb es;; with approx. 700 sx. Will drill 8 3/4" bole to 6500' and run pipe if required. All show will be tested in conformity with good oil field practice. L understand that this plan of work must receive approval In writing by the Geological Survey before operations may be commenced. Company Al edo 011 Cowpany Address ' 750 V, 5th St, r U -�, -' ••- 1. ...,�. /�) . ,x; . r, ,-:-c i:. , Ft,. WQrt11_ 2, --TGJ By , -1 I Waring Bradley - -- - — Title -- . ._A._; eat. — — GPO 914974 • Company Location Well No. Lease No. Drilling operations as proposed by you in attached Notice of Intention to Drill are subject to the following requirements: 1. Compliance with Federal Oil and Gas Operating Regulations. 2. The date actual drilling is started shall be reported promptly to the Regional Oil & Gas Supervisor. 3. Any change in the approved program must receive prior approval of the Regional Oil & Gas Supervisor. U 4. Adequate surface casing shall be used to protect fresh water zones and it must be cemented with sufficient cement to circulate to the surface. 5. All pertinent data, including electrical logs, directional surveys, core descriptions and analyses, stratigraphic and faunal determinations, formation tests, and similar information shall be submitted in duplicate. Electrical logs and similar surveys and the results of formation tests should be submitted as soon as the records are available. Other data not previously submitted shall be included in or submitted with the log and well history. 6. All rigs or wells shall be permanently marked in a conspicuous place and should show name of operator, lease serial number, number designation and location of the well. 7. Install adequate blowout equipment and maintain in good condition at all times. The rams should be tested at frequent intervals by opening and closing and against pressure. 8. Lessee's Monthly Report of Operations (Form 9 -329) covering all operations and production on this lease should be submitted in duplicate prior to the fifteenth of the following month. Mailing Address Office Address Regional Oil & Gas Supervisor Room 505 Cordova Building U. S. Geological Survey Telephones: P. 0. Box 259 Office - BR 5 -0511 Anchorage, Alaska Night - BR 4 -9141 FE 3 -4722 lc-apfm lOjan95 LOCATION CLEARANCE REPORT State of Alaska OIL AND GAS CONSERVATION COMMISSION Memorandum To File: API No. Note casing size, wt, depth, cmt vol, & procedure // Long Csg: 7.5J~ Liner Perf intervals - tops Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. 7' Well head cut off: Location Clearance ; , __/ ,- 7/- Code Operator Address · Aledo 0il Co. . 750 W. 5th St. Ft. Worth 2, Texas l~lame of Lease ! ~Vell No. Field & Reservoir A 023423 Eureka! 2 Wildcat . Location of ~Vell Sec-Twp-Rge or Block & Survey County 1629' N of SW corner Sec 18, T 2 N, R l0 W, CPI/ Application'todrlllthlswellwasflled I Has this well ever ] Character of well at cimpletlon (lnlttal production): in name of produced oil or gas Oil (bbls/day) Gas (MCF/day) Dry? Ai~Io Oil Co. No X , O11 (bbls/day) Gas (MCF/day) Water (bbls./day) April 5, 1963 8546' None None None Name of each formation con- Fluid content of each formation Depth interval of each formation Size,. kind & depth of plugs used raining oil or gas. Indicate Indicate zones squeeze cemented, which formation open to well- giving amount cement. bore. at time of plugging None None 75 sx of c~nent bottom at 875' 25 sx of cement, bottom at 20' CASING RECORD Size pipe ' Put in well (ft.) Pulled out (ft.) Left.in well (ft.) Give depth and Packers and shoes method of parting casing (shot; ripped etc) 10 3/4" 836 ,, 0 836 Halliburton float shoe 7" 5174 2800 2374 shot Halliburton s,~lf fill up shoe ..... 'l , Was well filled with mud-laden fluid, according to regulations? Indicate deepest formation containing fresh water. Yes None , NAMES AND ADDRESSES OF-ADJA. CE.NT LEASE OPERATORS OR OWNERS OF THE SURFACE Name Address Direction from this well: . . Aledo Oil Co. & partners 750 W. 5th St. Ft. -Worth 2, Tex. All ,directions , In addition to other information required on this form, if this well was plugged back for use as a fresh water well, give all pertinent details of plugging operations to .base of fresh water sand, perforated interval to .fresh water sand, name and address' of surface o~vner, and attach letter from surface owner authorizing completion of this well as a-'water well and agreeing to assume full liability for any subsequent plug- ging which might be required. ' Use reverse side /or additional detail . File this form in duplicate with the Commission. CERTIFICATE: I, the undersigned, state that I am tho agent of the , Aledo Oil (company), and that I am authorized by said company to make this report; and that this report was pre- pared under my supervision -and direction and that the facts stated therein are true, correct and complete to ~ the best[~[CE[v[DOfmy knowledge.,· · Signature~/~'~ ~ Alaska Oil and Gas Conservation Commission Plugging Record APR 19 1963 Form No. P-15 Authorized by Order No. 1 E)ivis/on of Mines and Mince'als Effective October 1, 1958. _ ~ Alaska Deot. of Nar,,ral Rosource~- 'RECEIVED" OCT 31 1962 Petroleum Branch Division of Mines and Minerals Alaska Dept. of Natural ResourceJ b~ ua on a bond aa abo~ described ~asuod ~n oonneotton vith ~Ane~ J~. Snow*8 wife to ~ tho ~ ~ b~ ~ m~d ~ the ~~ ~d ~ ~~ of J~~ ~o ~ f~ ~ ~o We trust you vil~ ~ ~t ~.a.7,.l ~oto m,.tief&etorir for f:l.l.tn~. /~/ ~'~rj Yer~ tr~l~, J. ~Lerqlr Tail, Ou~JF~tondont / cc: Mr. Tom Marshall, State Petroleum Geologist, State Division of Mdmerals, Anchorage, Alaska MR. TOM MARSHALL UNDERSIGNED AS ATTORNEY IN FACT FOR THE TRAVELERS INDEMNITY HAS EXECUTED THIS DATE o SERIAL I~023423 ANDfOR A $10~000 OIL & GAS LEASE BOND FORM 4-208G COVERING ANCHORAGE~ SERIAL t/023423A FOR ALEDO OIL COMPANY~ 750 WEST 5th~ FORT WORTH~ TEXAS. AFTER COUNTER SIGNATURE BY A RESIDENT STATE OF ALASKA AGENT THIS BOND WILL BE SENT TO YOU FOR FILING. WILLIAM R. SNOW 400 DALLAS ° ~ TEXAS 1963 b) A coupte~ de'tailed lltholoste lo~ oz .a ,mud lo$- e) A wli ht~ (daily history of dr~llin& opera&.toua). Your company Very truly yours, cc/ Ma~r~ng Bradley ~a R. Faurshall, Jr. Well History LOCATION: 1,727' N. of the SW corner of projected Sec. 18, T 2 N, R 10 W, CRM ELEVATION: Ground 3,308.9, K.B. 3,325 Spudded 10/28/62 and set 23' of 20" conductor pipe at 5'. Drilled out from under conductor at 1:30 p.m. o£ 11/1/62. On 11/2/62 drilling at 40' in boulder clay. On 11/4/62 drilling at 450' in shale. Boulders caving. 11/7/62 drilling at 703 in shale. 11/8/62 drilling at 837 in shale. 11/8/62 circulated hole clean and ran 838.49' of 10-3/4 csg. 4 centralizers on first 4 collars. Cemented csg at 836 KB with 650 sxs regular neat cement. Plug down at 3:30 p.m. 11/9/62 nippling up and mixing mud. 11/10/62 nippling up and putting on BOPs. Pressured up to 1000 lbs on csg. and BOPs and held £or 30 min. OK. 11/11/62 drilled to 1242' in shale with 8-3/4" bit, deviation 2~°. 11/12/62 drilling at 1567 in shale, deviations3°. 11/13/62 drilling at 1773 in shale, deviation 4-3/4°. 11/14/62 drilling at 1978 in shale, deViation 4°. 11/15/62 drilling at 2217 in shale, deviation 3-3/4°. 11/16/62 drilling at 2458 in shale, deviation 3°. 11/17/62 drilling at 2618 in shale, deviation 52~°. 11/1S/62 drilling at 2S06 in shale, deviation 4-S/4°. 11/19/62 drilling at 3012 in shale, deviation 3-7/S°. 11/20/62 drilling at S175 in shale, deviation 2-7/S°. 11/21/62 drilling at 3302 in shale, deviation 2°. 11/22/62 drilling at 3445 in shale, deviation 2-1/S°. (~ 11/23/62 drilling at 35~2 in shale, deviation 1-S/4°. ~' 11/24/62 drilling at S650 in shale, deviation 2°. 11/25/62 drilling at S773 in shale, deviation 2-1/S°. 11/26/62 drilling at S94S in shale, deviation 2-1/8°. 11/27/62 drilling at 40S5 in shale, deviation 2½°. Baroid Mud Logger started logging at 4000'. 11/28/62 drilling at 4157 in shale, deviation 3°. 11/29/62 drilling at ~245 in shale, deviation 2°. 11/30/62 !drilling at 4355 in shale. 12/1/62 drilling at 4460 in shale, deviation 2°. 12/2/62 drilling at 4598 in shale, deviation 2¼°. 12/3/62 drilling at 4712 in sdy shale, deviation 2-7/8°. 12/~/62 drilling at 4806 in sandy shale, deviation 22~°. 12/5/62 drilling at 4927 in sandy shale, deviation 1-7/8°. 12/6/62 drilling at 5107 in sandy shale, deviation 2½°. 12/7/62 drilling at 5183 in shale. 12/8/62 drilling at 5250 in siltstone, deviation 2-1/8°. 12/9/62 drilling at 5302 in silty shale, deviation 2°. 12/10/62 drilling at 5335 in siltstone, deviation 2-1/8°. 12/11/62 drilling at 5376 in siltstone. ~LEDO #2 EUREKA - Well History Page 2 12/12/62 drilling at 5428 in conglomerate, deviation 2-7/8°. 12/13/62 12/14/62 12/15/62 12/16/62 12/17/62 12/18/62 12/19/62 12/20/62 12/21/62 12/22/62 12/23/62 12/24/62 12/25/62 12/26/62 12/27/62 12/28/62 12/29/62 12/30/62 12/31/62 1/1/63 112163 1/3/63 1/4/63 1/5/63 1/6/63 1/7/63 " 5489 " " 5562 " 5631 . . 568O , , 5726 5759 ,t tt 5798 " 5839 " 5884 " " 5917 ,, ,, 2_3/40· t! , deviation 2-7/8°. , .. 3_1/20. ~t , deviation 4°. " 5968 in sand and shale, deviation 3-1/2° " 6029 "siltstone and shale, ::. :':"~':... " 6088 " 6136 " 6191 " 6233 " 6265 " 6295 " 6325 6357 " 6396 "~ conglomerate, deviation 3-1/2°. " " and siltstone, deviation 3-1/2°. ':' " , deviation 3-7/8°. t'! · ti , deviation 3-3/4° ,, ,, ,, 3_7/8°' ,, ,, ,, 3_1/20' " " " 4-1/16°. 6427 " '" , deviation 4°. 6469 ') shale and conglomerate, deviation 4°. 6518 " " " " · 6568 "conglomerate, deviation 4°. 6598 " " " 4-3/40. 1/8/63 running in hole with square drill collar, twisted off, left 1 square drill collar, 17 6-3/4 round collars and 6-1/2 jts of 4-1/2" drill pipe. Made up fish- ing string. Took hold of fish at 5000'. Worki~ fish up hole. Established good circulation. .Fish jumped uphole. Swivel hole jumped out of hook and fish fell back. Pulled out,of hole. 1/9/63 layed down 60 joints bent drill pipe. Picked up new drill pipe and ran in hole trying to get over fish. 1/10/63 got hold of fish, established circulation, jarred on fish and moved about 20'. 1/11/63 jarred on fish. Rigged up Schlumberger and ran free point. Pipe free at 4980 and partly stuck at 5100'· Backed off at 4980, recovered drill pipe and 1 collar. 1/12/63 ran in hole with jars, bumper sub, crossover sub and 5 6-3/4 drill collars. Tried to screw onto fish, could not find top of fish, pulled out, ran in hole with overshot and wall hook, caught fish and jarred on fish. ALEDO #2 EUREKA - Well History P~e 3 1/13/63 jarred on fish, spotted 20 bbls diesel oil, jarred and lost hold, pulled out overshot, left slips in hole, ran in to screw on, could not screw on, part of overshot slip was in box looking up, pulled out of hole and put on new charge over sub. 1/14/63 ran back in hole and circulated top of fish, ran sinker bars, spudded broken piece of slip to bottom, screwed into fish, jarred on fish 2½ hours, stripped threads out of box on fish, screwed back in box, ran free point. 1/15/63 backed off 1 collar, pulled out of hole and layed down collar, ran in hole with crossover type sub to screw out fish but couldn't, pulled out and ran 7-5/8" over shot, could not get over fish, pulled out, ran over shot with wall hook, no slips, pulled drill collars out from wall, pulled out of hole, made up overshot. 1/16/63 tried to straighten fish in hole to screw into fish or catch with over- shot, bent joint of drill pipe and hookwall overshot, hookwall overshot would not go down. 1/17/63 tried to screw into fish with bent joint, couldn't, ran overshot on bent joint, would not go down hole, drilled past stuck collars 10' with 7-5/8" bit. 1/18/63 ran overshot with wall hook, hooked fish over in hole, pulled out, ran bent single and crossover sub trying to screw into fish, no luck. Got 8-3/8" -1" got hold of fish and overshot from Los Angeles and ran same with 62 slips, pulled 180,000 lbs, slipS!let go, pulled out, left }" of slips in hole, ran overshot with 6-3/4" sliPS,i got hold of fish and jarred at 180,000 lbs, over- shot let go, pulled~out~and left slips in hole, ran overshot with 6}" slips, got good hold, tried to spud iron slips out of box of fish with Schlumberger, could not, started jarring on fish. 1/19/63 tried to break up slips in top of box on fish with sinker bar, could not, jarred on fish at 180,000 to 220,000 lbs. and moved fish, recovered fish. 1/20/63 conditioning hole at 6598. 1/21/63 drilling at 6649 in sandy co~gl~ca~eT~te, deviation 4-3/4°. 1/22/63 drilling at 6687 in conglomerate. 1/23/63 drilled to 6695 in ~ongl~,~e, pulling out to change bits, got stuck in hole at 1830'., working stuck pipe, moved up hole to 1806'. 1/24/63 worked stuck drill pipe, spotted 30 bbls diesel oil, worked pipe, moved up hole 8', worked pipe, still'moVing it. 1/25/63 worked pipe loose and pulled out of hole, conditioning hole and preparing to run 7" csg. 1/26/63 conditioning hole. 1/27/63 ran 134 jts 7" 23 lb. N-80, LT&C 8 rd. csg. (5174.43') cemented at 5170 KB with 100 sxs neat cement, plug down at 12 midnight, W.O.C. 1/28/63 W.O.C. and getting ready to nipple up. 1/29/63 nippling up. AT,~DO #2 EUREKA - Well History Pa~e 4 1/30/63 finished nipPling up, layed down ~ drill pipe, changed kelly and moved ~2 D.P. off rocks and put 3½" D.P. on rocks, put rig on standby at 12 midnight.to await arrival of square.drill collar, etc. 1/31/63 on standby to midnight of 2/3/63 2/4/63 picked up 4-3/4" drill dollars and ~ drill pipe. Tested BOPs, drilled out float and shoe and ran to bottom. 2/5/63 drilling at 6716 in conglomerate. 2/6/63 " " 6734 t, ,, 2/7/63 " " 6757" " ,deviation 4-1/8° 2/8/63 " ". 6780 ;' ;'· " 4-1/4© 2/9/63 " " 6804" " 2/10/63 " '~' 6826 '; " deviation 4-1/2© 2/11/63 " " 6852" " first button bit made 37' in 35¼ hrs 22,000 and 45 RPM 2/12/63 drilling at 6888 in conglomerate, deviation 4-1/4° 2/13/63 " " 6925" " " 5-1/4© 2/14/63 " " 6907" " " 4-7/8° 2/15/63 " " 7005 " " " " 2/16/63 " " 7041" " '" 4-3/4° 2/17/63 " " 7093 in conglomerate and sandy shale, deviation 5© 2/18/63 " " 7137 in sandy conglomerate 2/19/63 " " 7164 in sandy conglomerate with some chert, deviation 4-7/8© 2/20/63 " " 7192 in sandy conglomerate and chert, deviation 4-7/8© 2/21/63 '" " 7223 in sandy conglomerate, deviation 4-7/8° 2/22/83 " " 7255 " " " " " 2/23/63 " " 7275 ¥~ " " " 4-3/4° 2/24/63 "· " 7305" " " " 4-7/8° 2/25/63 " " 7335" " " " 5° 2/26/63 " " 7365 " " " " " 2/27/63 " " 7401 " " '" " " 2/28/63 " " 7439" " " " " 3/1/63 ;' " 7469" " ' " " " 3/2/63 ". " 7498 'i' conglomerate, .deviation 5,1/2° 3/3/63 " " 7533 in sandy conglomerate, deviation 5-1/2° 3/4/63 '~' " 7563 in conglomerate, deviation 5-1/2° 3/5/63 ". " 7596 " " " " 3/6/63 " " 7629 in sandy conglomerate, deviation 5-1/2° 3/7/63 " " 7663 in conglomerate, deviation 5-1/2© 3/8/63 " " 7697" " " 5-7/8° 3/9/63 " " 7725 " " " " 3/10/63 " " 7763 ;' " " " 3/11/63 " " 7815 in sandy ~o~}',~m~r.~e, deviation 5-7/8° 3/12/63 " " 7864 in shaley " " 3/13/83 " " 7906 in cong~c~er.a~e, deviation 5-3/4° 3/14/63 " " 7956" " " 6° 3/15/63 " " 7987" " " 6-1/4© 3/16/63 " "8018 ". '*'. ". 6-1/2° 3/17/63 " " 8052 "_ ". ". " 3/18/63 " " 8080 ". " " " ALEDO #2 EUREKA- Well History P~4~e 5 3/19/63 drilling at 8110 in conglomerate, deviation 7° 3/20/63 3/21/63 3/22/63 3/23/63 3/24/63 3/25/63 3/26163 3/27/63 3/28/63 3/29/63 3/30/63 3/31/63 4/1/63 4/2/63 " 8134 " " 8158 " 8181 " " 8216 " " 8242 " ':' 8266 " " 8290 " " 8317 " " 8341 " " 8366 " " 8397 " " 8435 " " 8479 " " S514 " ,, 6- 7/8 7© 7_1/8° 7.1/2© 7-1/4© ,! ,! .4/3/63 drilled to 853,4 rigged up Schlumberger and ran logs, gamma ray neutron from 0 to 5300' IES and continuous dip meter from 5178 to 8532 ~ · 4/4/63 ran diamond core bit and cored from 8534 to 8546.5 T.D. and began pull- ing core. ~ 4/5/63 recovered 100~ of core, hard silicified con4~lomerate, basement, layed down drill pipe, ran free point on 7" csg, free at 2775, partially stuck at 2800 and stuck at 2850' shot off at 2787 and began pulling 7" csg 5/6/63 finished pulling 7" csg, set,75 sxs cement plug at 930', top of plug 80' up inside 10'3/4" surface.csg, 25 sxs cement plug in top of 10-3/4" csg and cellar, sign welded to top of 10-3/4" csg on 5' of 3" pipe as marker. P & A Su~lk~ ill Spudl 10-28-62o ~l~d~ I~& 5-6-63. T.D. I~lu~8: 930' -850' ~onn ~-881~ (Feb. 19~1) (SUBMIT IN TRIPLICATI~) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Budget Bureau No. 42'R358.4. Form Approved, ,-nd o~._.__~_c_?_E~_e_ ..... c.. ~.. ...... Q__~__3__4_.~_.3. .......... u.~, ........... ~.u___r..e~_ ......... 10 W CRM SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO CHANGE.PLANS ....................... I ...... II SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING ............. :'-I ..... .ST,CE oF ,.~.T,O.TO.~..,=L O..~^,. W~ .........I ...... I.U~QUE.T REPO.T 0r .E-..=,.~ O..Re^,. ................ I ..... NOTICE OF INTENTION TO PULL OR ALf/R CASING .............. I ......I SUPPLEMENTARY WELL HISTORY ......................................... NOT,CE Or ,NTENT, ON TO ~N~. '=~ ...................... / ...... I ~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) October l? 19____6._2 See. ~nd ~.e. No.) 2 N 10 W Copper River (Twp.) (R~n~e) (Meridian) (Field) (County or Subdivision) (State or Territory) The elevation of the derrick floor above sea level is __.3__3__2_~__ ft. DETAILS OF WORK (State names of and expected depths to objective s~nds; show sizes, woilhb;and lengths o~ proposed cmoinlsl indicote mudding jobs, cement. . lng points, and aH other importmnt proposal work) Nelchina lime and sand 5500 to 6000, Jurassic sands between 6000 and 8000. Will drill 15' hole to 1200' and set approx. 1200' of 10 5/8" 48 lb csg with approx. 700 sx. Will drill 8 3/4" hole to 8500' and run pipe if required. Ail shows will be tested in conformity with good oil field practice. ! understand that thio plan of work must rocelvm approval in writing by the Goolowicml Zurvey before operations may be commenc, d. GPO 914974 APPLICATION F~~ P~R~'it'~TO'-DRILL,' DEEPEN OR PLUG BACK _ , ~ APPLIeAT.!ON T:O: D~I~u_~,.~ DEEPEN [] PLUG BACK [] NAME OF COMPANY OR OPERATOR ~',~_;~i; ~:~. ;~'~; :. C. ' L-.~.~ , -'L~'~;-~ - ~ ~f:-'-- ' ~-'-. '- ~' . . DATE State Elevation ( ) Well location (give footage from section lines) Section--township--range or block & survey Field 'J .(~our~ty ' Distance, in miles, agd direction f~om nearest town or post office Nearest distance from proposed location to property or lease line: feet Rotary or cable~~ Distance from proposed location to nearest drilling. completed or applied--for well on the same lease: ~JJJ feet JApprox. date work will starl ijJ ~ Proposed depth: Number of acres in le~se: Number of wells on lease, including this well, completed in or drilling to this reservoir: If lease, purchased with one or more wells drilled, from whom purchased: Name Address Status of bond Remarks: (If this is an application to deepen or plug back; briefly describe work to be done, giving present producing zone and expected new producing zone) CERTIFICATE: I, the undersigned, state that I am'the ~ of the (company), and that I am authorized by said company to make .this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to the best of my knowledge. Permit Number: 3 Approved By: ~~, Notice: Before send~g ~ this form be sure that you have given a]l'information requested. ~uch u~ecessary correspond- ence w~ thus be avoided. See Instruction on Reverse Side of Form Signature Alaska Oil and Gas Conservation Commission Application to Drill, Deepen or Plu~ Back Form No. P-1 Authorized by Order No. I Effective October 1, 1~58 Z~ .= ~" 12' LT. - , . . EARL Ri,. BAR-NARD CO,_ _ CONSULTING BO~ I~-g_ ~-' .;... ~. ENNA,... L ~ N [:: A T ~ [ S ~.:~.~ ~. O c T, ~ , IgG~ ' t = 1000 ~ --