Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout167-020ic-apfm
10jan95
PLUGGING
State of Alaska
& LOCATION
REPORT
CLEARANCE
ALASKA OIL & ~AS CONSERVATION CO~ISSION
PTD No. ~F-~ZO
Lease
Memorandum To File: API No.
Well Name
Operator
Location
Spud:
Abnd Date
TD: /7~ 7r 3 ,
Completed
Note casing size, wt, depth, ~mt vol, & procedure.
csg: /~ ~¢~ ~o~- ~_ zoo ~
Sfc
Long Csg: --
Liner:
Perf intervals - tops:
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
~11 head ~ut off:
Marker post or plate:
Location Clearance:
Conclusions: ~{l(c
,
code
Signed .%~~ ~/~f--~_~ ~
-
Date
FORM SA, - 11B
12.5 .SM 8/67 '"~.
MEMORANDUM
TO: r-
FROM:
State of' Alaska
DATE : ~ 4e ~ .,) --~- //
SUBJECT:
THE SUPERIOR OIL COMPANY'
P. O. BOX 1521
HOUSTON, TEXAS 77001
December 18, 1967
Mr. Thomas R. Marshall
Department of Natural Resources
Division of Mines & Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Dear Mr. Marshall:
The Superior Oil Company
Three Mile Creek State No. 1
Permit No. 67-20
Lease No. ADL 03264
Attached is the well completion report of the subject well.
Very truly yours,
ELM: ir
Att.
RECEIVED
DIVI,SlON OF MINES & MINERAL8
ANCHORAGE
Form P--7
SUBMIT IN DUPLIC~
":gSTATE OF ALASKA < see other
structions
OIL AND GAS CONSERVATION COMMITTEE reverse side)
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
Effective: July 1, 1964
5. LEASE DESIGNATION AND SERIAL NO.
hDL 03264
6. IF INDIAN, ALLOTTEE OR TRIBE NAME
la. TYPE OF WELL:
b. TYPE OF COMPLETION:
NEW ~] WORK ~-]
%YELL OVER
OIL,~vELL ~-~.. GASwELL ~'~ DRY [] Other
DEEP- ~'~ PLUG r--] DIFF. ~'~
EN BACK RESVR. Other
2. NAME OF OPERATOR
~HE SUPERIOR OTL COMPANY
3. ADDRESS OF OPERATOR ....
P. O. Box 1521, Houston, Texas
4. LOCATION OF WELL (Repor~ loo~iOn C~e~r~ a~d i~ accordance
7. UNIT AOREEMENT NAME
FARM OR LEASE NAME
State of Alaska
WELL NC. Three Mi£e Creek
State No. 1
10, FIELD AND POOL, OR WILDCAT
Wildcat
11. SEC.~ T., R., M., OR BLOCK AND S~RVEY
At surface Center of NW/4,
At top prod. interval reported below
At total depth
Same as surface
15. DATE SPUVDED I 16' DATE T.D. BEACHED
7-8-67I 10-16-67
Section 3, T 12 N,
14. PERMIT NO.
67-20
Rll W, S M
DATE ISSUED
5-16-67
Sec 3,T12N, RllW
Seward~Meridian
12. BOROUGH
t13. STATE
Alaska
19. ELEV. CASINGHEAD
10-24-67[ 325 GR 321
20' TOTAL DEPTH' MD & TVD 21' PLUO' BA(~KT'D" MD & TVD I 22' IF MULTIPLE COMPL" I 23' INTERVALS ROTARY TOOLS [ CABLE TOOLS13773 ' Surface HOW MANy* DRILLED> s~ J 13773 '
24. PRODUCING INTERVAL(S), OF THIS COMPLETION--TOP, BOTTOM, NAME (MD AND 'TVD)$ 25. WAS DIRECTIONAL
SURVEY MADE
No
None
26. TYPE ELECTRIC AND OTHER LOGS RUN '~ 27. WAS WELL CORED
ILS, CPM, sonic, Formation Deffsity No
28. CASING R~ORD (Report oll ,trino8 set i~ well)
CA~INO SIZE WEIGHT, LB./FT. DEPTH SET (M~ HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 75~
1 C1 3/Zl," Z].O _50:{:{:
..
I
205 &. I 20"
.oo3
I
390 sx
15" 1670 sx
none
none
LINER RECORD ~. 30. TUBING RECORD
29.
SIZE TOP (MD) BOTTOM (MD) SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)
31. PERFORATION RECORD (Interval, size and number)
SACK~:CEMENT*
32.
ACID. SHOT, FRACTURE. CEMENT SQUEEZE, ETC.
.-
none
DEPTH 'INTER AI/A!~ (MD) Al%IOUNT AND _KIND OF- MATERIAL USED
33.* ~.;'~-~' PRODUCTION Plugged. and abandoned
DATE FIRST PRODUCTION PRODUCTION METHOD (FIOW'~z~./~2~ l;as. lif~, pumping size ~d ~6 o~ pB-~p) ~ WELLs~.i~)STATUS (P~O~Oi~g or
34. DISPOSITION OF OAS (~Old, used for fuel, vented, etc.) 't~ ~zs~ WITNESSED BY
35. LIST OF ATTACHMENTS
36. I hereby~t~,oingsiGNED~ ~" %,'~F~~~and attached information is complete and correct as determined f~om all available: records
TITLE Sr. Drillinq.. Engineer
E. L. Mo~e-s. J~. "
*(See Instructions and Spaces for Additional Data on Rever~e Side)
DATE December 18, 196 7
INSTRUCTIONS ....
· ~: '-.- ,-~
General: This form is designed for submitting a complete and correct well completion report and log on ali types of lands 'and le~ses ~ either a Federal agency or a State agency, -
or both, pursuant to applicable Federal and/or State laws and regulations. Any necessary special instructions concerninglthe use of this form and th~ number of copies to be
submitted, particularly with regard to local, area, or regional procedures and practices, either are shown below or will be,'issued by/or may be obtained from, the local Federal
and/or State office. See instructions on items 22 and 24, and 33, below regarding separate reports for separate completionsi.. :. ;' '-' "'
If not filed prior to the time this summary record is submitted, copies of all currently available logs (drillers, geologists, sample and core analysis, all types electric, etc.), forma-
tion and pressure tests, and directional surveys, should be attached hereto, to the extent required bY2applicable Federal and/or Stale laws and regulations. All attachments
should be listed on this form, see item 35 ....
I~em 4: If there are no applicable State requirements, locations on Federal or Indian land should be described in accordance with Federal req~uirements. Consult local-State
or Federal~ffice for specific instructions. · ':' ~ ' '. _~: -_ ~
,.~em l~: Iffg4~hca..te.~w,h.l.ch ele..va, tlon m.use~l~ ~as referen, ce (w.her~ not~ otherwise shown) .for depth measure..m, ents_ given ~.n other spaces on this form and m any attachments.
!?~ms z.z a~; z?. ~r. rni? w. ea. m. c~mpi.e .r~l ro.r separa, re. p.r..oauc~i.on, rrom.mo~.re tha? on.e interval zone (multiple completion), so state in-item 22, and in item 24 show the pr~lucing
~.~rerva.~, or~n~erva~s, top(s), ootrom(s~ aha name(s) (~r any) for omy rne interval reported in item 3~ Submit a separate report (page) on thi~ foEm, adequately id~r~tified.
~r each ad~tti, ppal interval to be separatel~v produced, showing the additional data pertinent to such interval.~ ' ~. ~':. -'
~m ~ ~Sh~mi~ement":' Attached supplerhental records for this well should show the details of any multiple stage cementing and .t~fe location of the cementing tool.
~em .~:~uo0~i~a separate completion report on this form for each interval to be separately produced. (Sdeinstruction for items 22 and 24 above.)
,,~:i' ~'~. ~ ~ - '
~. ~,~'~,~ o~ ~o~ovs zo~ss: -, ,
-.- SHOW ALL IMPORTANT ZONES OF POROSIT,~ AND CONTENTS THEREOF; CORED INTERVALS" AND ALL DRILL-STEM TESTS, INCLUDING 38. ' GEOLOGIC HARKERS
~ DE~H INTERVAL TESTED~ CUSHION US~D~ TIME TOOL OPEN~ ~LOWING AND SHUT-IN PRESSUR~S~ AND RECOVERIES '~
~pRMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP
,~ NAME
~ . -~ MEAS. DEPTH TRUE V~RT.
_
. ~.
-
: '1
.~.
REFE~ TO C~ONOLOGICAL ~LI HISTORY ATTACHED -TO--~LL :FILE
.
..
.
C~
-
.....
.
....,
.
.
- , _
.
THE SUPERIOR OIL COMPANY
~on FIRST NATIONAl- BUILDING
ANCHORAGE, ALABKA 99501
THE SUPERIOR OIL COMPANY
THREE MILE CREEK STATE #1
TYONEK AREA ~ ALASKA
D..ai.lz. Drilling Reports
7-9 -67
1st day. TD 202'. Conglomerate-coal-clay. Made 202' last
24 hrs. Mud lO#/gal~ viscosity 64. Surveys: 60' - 0 deg,
120t - o deg, 202' - % deg. Bit #1, 15" Reed T-3A. Ran
13% hr, made 202' of hole, 3 9/16 jets, 65 spm, 710 gpm,
1000 pressure, 0-5000 wt~ 100 rpm.
Bit 1A~ 20" Security hole opener, 3% hrs~ made 180' of hole~
3 %" jets, 65 spm, 710 gpm, 800 pressure, 0-5000 wt~ 100 rpm.
Spudded in at 8:00 am 7-8-67. Drilled to 202'. POH. Picked
20" hole opener~ opened hole to 20". Now opening hole ~ 180'.
7-10-67
2nd day. TD 205'.
70. Bit #2, 20" Smith K2P. Reamed 105' of hole.
Opened 15" hole to 20". Made wipe-up trip O.K. Started
picking up 16" casing, hit ledge ~ 63'. POH. Picked up 20"
HO, reamed from 45' to 79' in 2 hrs. WIH to 198'~ had 4' of
fill, could not clean out. POH. Picked up 15" bit~ WIH~
cleared out fill & drilled to 205'. POH, picked up 20" hole
opener, reran same to TD of 205' O.K. POH, picked up 16",
WIH to 80' had to work & circulate ~ pipe worked down to 180'
could not get deeper. POH~ Made up 20" bit extension sub and
20" hole opener. WIH, started reaming ~ 100' ~ reamed to 205'
circulated out. Built viscosity to 70. POH. Now preparing
to run 16" casing.
Made 3' last 24 hrs. Mud lO#/gal, viscosity
7-11-67
3rd day. TD 205'. Zero footage last 24 hrs. Mud lO#/gal~
viscosity 70.
Finished running 16" OD 75# J-55 T&C casing to TD of 205'.
Circulated mud around cemented shoe on bottom w/390 sx, Class
A treated w/2~ CaC1. Mixing & pumping time: 38 minutes. Job
completed ~ 7:20 am. Had full returns while mixing & pumping.
Had returns on cement after mixing 365 sx. Cut off 24" & 16"
casing~ welded on 16" flange & installed 16" hydrill. Now
installing 2" choke manifold & kill lines.
7-12 -67
4th day. TD 308'. Sand & siltstone. Made 103' last 24 hrs.'
Mud 9.4#/gal, viscosity 57. Bit #3, 9 7/8" Reed 3A~ 3% hfs,
made 103' 3 %" jets~ 0-5000 wt, 110 rpm
Finished nippling up BOP and choke manifold. Tested all to
lZO0 psi. WIH with 9 7/8" bit on bottom of 9 7/8" hole opene~.
Hit cement ~ 192'. Drilled out of shoe ~ 8:30 pm. Drilled to
218'. POH, layed down 15" hole opener. WIH. Now DA w/Bit #3.
7-13 -67
5th day. TD 1110'. Sand & shale. Made 802' last 24 hfs
Mud 9.8#/gal, viscosity 45. Surveys: 370' - 3/4 deg; 422
% deg; 511~ - 1 deg; 680' - 1 deg; 798' - 3/4 deg; 922' -
~ deg; 1047' - 3/4 deg.
Bit #4, 9 7/8" Reed ST3AJ, 21% hfs, made 905', 3 %" jets,
spm, 670 gpm, 1400 pressure, 2-10,000 wt, 150 rpm. Bit cond:
TS-B2-I pinched. Drilled to 1110', POH, changed bits. Now
GIH w/Bit ~5.
7-14 -67
6th day. TD 1878'. Siltstone & sand. Made 768' last 24 hrs.
Mud 9.8#/gal, viscosity 62, W.L. 9.2. Surveys: 1217' -% deg;
1344' - % deg; 1496' - % deg; 1620' - % deg; 1749' - 0 deg;
1868' - % deg.
Bit #5, HTC X-3, 17% hfs, made 768' of hole, 3 %" jets, 60 spm,
650 gpm, 1400 pressure, 10 - 15,000 wt, 140 rpm. Drilled to
1878'. Now POH to change bits.
7-15-67
7th day. TD 2003'. Siltstone, sand & coal. Made 125' lsat
24 hrs. Mud 9.8#/gal, viscosity 62, W.L. 8.0. Surveys: 2003' -
% deg. Bit #6, 9 7/8" Sec S-3J, 2% hfs, made 125', 3 %" jets,
60 spin, 650 gpm, 1400 pressure, 15,000 wt, 140 rpm. Bit #6A,
15" Sec HO, 4 hfs, made 583', 6 %" jets, 62 spin, 670 gpm, 800
pressure, 5-20,000 wt, 140 rpm..~ ~
Finished trip for new bit. Drilled to 2003'. Circulated hole
clean, made survey, POH. Started rigging up Schlumberger ~
9:15 am. Ran IES, density gamma ray caliper, sonic & dipmeter
logs. Finished with Schlumberger ~ 9:00 pm. Laid down 18 its
drill pipe. Picked up 15" Sec HO, 1 drill collar, 15" stabilizer,
& 8 7" drill collars. Now reaming ~ 801'.
7-16-67
8th day. TD 2003'. Made zero footage last 24 hrs. Mud lO#/gal
viscosity 55, W.L. 9.0. Bit #6A, Sec HO, 12 b_rs, 1343' of
hole, 3 11/16 & 3 3/4" jets, 124 spm, 1140 gpm, 700 pressure,
15,000 wt, 150 rpm. Bit 6B, 15" Sec HO, 9% hfs, 454' hole,
3 7/16" & 3 3/4" jets, 124 spin, 1140 gpm, 700 pressure, 15,000
wt, 150 rpm.
Opened hole to 15" from 218' to 1548'. Made trip for new hole
opener Opened hole to 2003' circulated out. Dropped Totco
- , ·
POH. Layed down 9 7/8" bit. WIH w/2 15" HO & 15" bit.
7-17-67
9th day. TD 2003'. Made zero footage last 24 hrs. Mud 10#/gal,
viscosity
Finished in hole with 2 15" HO & 15" bit. Circulate bottoms
up, pulled up to 200', went back in hole, circulated, POH. Rigged
up & ran 49 its 10 3/4' OD 40.50# J-55 seal lock casing(2010.45)'
to TD of 2003'. Circulated out, cemented casing w/1550 sx Class
A with last 150sx treated w/2% CaC1. Mixing & pumping time:
2 hrs. Job completed ~ 5:15 pm with 2000 psi of pressure. Had
no returns on cement, lost approx 75 bbls of mud while pumping
plugs down. Let set 1 hr~ filled annulus with 16 bbls of water.
Mud down approx 150'. Let set 2 3/4 hfs, ran 2" pipe in annulus
to 200', mixed & p.umped 120 sx of Class A Cement & hole filled
up. Mixing & pumping time: 15 min. Job completed @ 8:20 pm.
Hole stayed full, removed 16" hydrill & cut off 10 3/4" & 16"
casing, welded on casing head. Now nippling up BOP.
7-18-67
lOth day. TD 2003'. Made zero footage last 24 hrs. Installed
12" series 900 BOP. Nippled up same. Tested casing & blind
rams to 2000 psi. Held O.K. Tested hydrill pipe rams and choke
amnifold to 3000 psi. Held O.K. Picked up bit, bit sub, 18
7" drill collars, switch sub, bottom hole assembly(515.31'),
44,000 lbs. WIH, hit cement ~ 1962'. Circulated 15 min, tested
kelley cock to 2000 psi, O.K. Finished testing ~ 3:00 am.
7-19-67
llth day. TD 2486!. Grey sand & coal. Made 483' last 24 hrs.
Mud 9.9#/gal, viscosity 3g, W.L. 12.2, 3/32, sd 1~, yld 2,
P.H. 9, P.F..3. Surveys: 2067' - % deg; 2175' - % deg;
2355' - 0 deg.
Bit #6, 9 7/8" Sec S-3, rerun 2 hfs, 41' cement, 64' of hole,
3 9/16" jets, 65 spm, 495 gpm, 800 pressure, 15-20,000 wt, 140
rpm. Bit #7, 9 7/8" HTC X3, 5 3/4 hfs, 419', 3 12/32 jets, 65
spm, 680 gpm, 2300 pressure, 30,000 wt, 140 rpm.
Repaired rig 3:00 am to 1:30 pm. Drilled to 2067'. Dropped
Totco. POH, changed bit, piCked up circle-C-assembly, WIH,
reamed from 2003' to bottom. Bottom hole assembly: bit, circle-
C-assembly, 1 drill collar, circle-C stabilizer, 17 drill collars,
cross-over sub (535.71') 47,000#. Now DA.
7-20-67
12th day. TD 3292'. Clay, sand & coal. Made 806' last 24 hrs.
Mud lO#/gal, viscosity 38, W.L. 9.8, 2/32, 12 gpg, sol 10~, yld
4, P.H. 8.5, P.F. .15. Surveys: 2796' - % deg; 2949' - % deg;
3151' - 3/4 deg; 3292' - 1 deg. Bit #7, HTC X3, 20% hfs, 1225'
of hole, 3 12/32 jets, 64 spm, 485 gpm, 2400 psi, 25-30,000
110 rpm. Drilled to 3292, made survey. Now POH to change bits.
7-21-67
13th day. TD 3932'. Siltstone, sand & coal. Made 640' last
24 hrs. Mud lO.2#/g&l, viscosity 41, W.L. 6.4, 2/32, 15 gpg,
sd 1~, sld~lO~, P.H. 9.5, P.F. 1'0, Surveys: 3440' - 1 deg;
3593' - 3/4 deg; 3748' - 3/4 deg; 3902' - 3/4 deg.
Bit #8 9 7/8" Reed STMJ, 15% hfs, 639', 3 3/8 jets, 64 spm,
485 gpm, 2400 pressure, 30,000 wt, 120 rpm.
Finished out of hole changed bits. WIH, cleaned out bridge
from 2750' - 2780'. Finished in hole. Now DA. Started adding
spersene XP-20, 4 to 2#/bbl.
7-22-67
14th day. TD 4336'. Siltstone with beds of coal & sand. Made
404' last 24 hrs. Mud lO.3#/gal, viscosity 40, W.L. 5.0, 1/32,
17.5 gpg, sd 3/4%, sld 9.0, P.H. 9.5, P.F. .6. Surveys: 4055' -
1 deg; 4184' - 1 deg.
Bit #8, 9 7/8" Reed ST-3, 20% hfs, 774', 3 3/8" jets, 64 spm,
485 gpm, 2400 pressure, 30,000 wt, 120 rpm, T6, Bi~ I.
Bit #9, 9 7/8" Reed ST-lAG, 12 hrs, 270' 3 3/8" jets, 64 spm,
,
485 9pm~ 2400 pressure~ 20-30~000 w~ 120 rpm.
Drilled to 4066' POH to change bits Picked up Driltrol
, ·
stabilizer ~ ~ of 4th drill collar. WIH. Now DA. Show
4310-15, gas units increase on hot wire. 15,800 ppm cI.
7 -23 -67
15th day. TD 4737'. Siltstone, sand & coal. Made 401' last
24 hrs. Mud lO.4#/gal, viscosity 40, W.L. 5.0, 2/32, 15 gpg,
sa 3/4%, sol 8.0, P.H. 9.0, P.F. .6. Surveys: 4338' -1% deg;
4460' - 1 deg; 4600' - 1% deg; 4706' - 1~ deg.
Bit #9, 9 7/8" Reed ST-lAG, 27 hfs, 534', 3 3/8" jets, 64 spin,
485 gpm, 2400 pressure, 20-30,000 wt, 120 rpm, T-5, B-2, I.
Bit #10, 9 7/8" HTC X-3, 5 3/4 hfs, 137', 2 12/32, 1 13/32 jets,
65 spin, 495 gpm, 2400 pressure, 20-30,000 wt, 120 rpm.
Drilled to 4600'. Made trip for new bit O.K.
7-24 -67
16th day. TD 5014'
. 4 . Siltstone, clay & coal. Made 277' last
24 hfs Mud 10. ~/gal, viscosity 38, W.L. 5.2, 2/32, 15 gpg,
sd 3/4%, P.H. 9.0, P.F. .35. Surveys: 4706' - 1~ deg; 4831' -
1 3/4 deg; 4921' - 1 3/4 deg.
Bit #10, HTC X-3, 24 hfs, 414', 2 12/32, 1 13/32 jets, 65 spm,
490 gpm, 2300 pressure, 15-18,000 wt, 120 rpm.
Drilled to 5014'. Now preparing to pull out of hole.
7-25 -67
17th day. TD 5261'. Siltstone, clay with sand & coal. Made
247' last 24 hrs. Mud lO.5#/gal, viscosity 38, WSL. 5.2, 2/32,
12 gpg, sd 3/4%, sol 10.0, P.H. 9.0, P.F. .35. Surveys: 5020' -
1% deg; 5136' - 1 3/4 deg; 5259' - 2 deg.
Bit #11, 9 7/8" HTC X-3, 16 hfs, 247', 2 12/32, 1 13/32 jets,
65 spm, 490 gpm, 2300 pressure, 20,000 wt, 100 rpm.
Finished trip for new bit O.K. Now DA.
7 -26 -67
18th day. TD 5351'. Siltstone & coal. Made 90' last 24 hrs.
Mud lO.5#/gal, viscosity 38, W.L. 5.4, 2/32, 15 gpg, sd ~,
sld 14, P.H. 9, P.F. .35.
Bit #11, 9 7/8" HTC X-3, 22% hfs, 337', 2 12/32, 1 13/32 jets,
65 spin, 480 gpm, 2300 pressure, 25,000 wt, 100 rpm.
Drilled into coal bed 5303-5320, 17'. Drilled through coal bed
O.K by picking up and reaming every 5'. Made connection O.K.
& drilled to 5351' Picked up to 5317' pipe stuck ~ 9:25 am
, '
.
Pulled to maximum of 350,000 lbs - 200,000 above wt of pipe.
Mixed 1 drum of pipe lax & 40 bbls of diesel oil & spotted
around bit. Had 26 bbl out & 14 bbl in ~ 1:07 pm. Worked pipe
until 7:00 pm, moving diesel oil every % hr. Rigged up Dia-log,
ran free-point readings ~ 3002' - 72, 4002' - 72, 4760' - 64~
4780(top of DC) - 13, 5015' - 9~ 5200' - 10, 5300' - 3, 5280' -
7, 5250' - 9, 5278' - 7.
Attempted to back-off at 5275' & failed. Ran shot and attempted
to BO 2DC above ~ 5208' - no luck. POH with Dia-log, circulated
out and worked pipe. Had a lot of coal to surface while circu-
lating. Rigged up Dia-log, reran free-point. Readings ~
2005' - 60, 4002' - 74, 4750' - 70, 4777' -46, 4770' - 72~
4817' - 12, 4775' - 70, 4782' - 14, 4963' - 12, stuck ~ switch
sub from DP to DC.
7-27-67
19th day. TD 5351'. ~.de zero footage last 24 hrs. Mud 10.5#/
g~l~ viscosity 52, W.L. 4.5, 2/32, 18 gpg, sd 3/4%, sld 14~
yld 7,. P.H.4 ' W.L., 4750' driller POH, recovered 51 stds
Backed off .
& 1 single~ leaving top of fish ~ 4750'. Picked up 6%" Bowen
bumper sub, 6%" oil jars & 7 7" DC's. WIH screwed into fish
jarred on fish 1% hrs. (Had some trouble circulating, jarred
down and started circulating with 2500 psi pressure). Spotted
40 bbls of diesel oil mixed with 2 drums pipe lax. Jarred
on fish with 120,000# above the wt of the pipe for 1% hrs.
Pipe came free (~ 2:45 pm. Pulled 1 std & circulated out.
magnafluxed 10 DC's. Bulb burned out on magnaflux light.
Layed down circle-C-assembly. Now going in hole with bit,
1 DC, stabilizer, 1 DC, stabilizer, 3 DC's, rubber stabilizer,
3 DC's, rubber stabilizer, 10 DC's, switch sub, Schaffer-
Wagoner bumper sub, and oil jars.
7-28-67
20th day. TD 5612'. Siltstone & coal. Made 261' last 24 hrs.
Mud lO.6#/gal, viscosity 40, W.L. 4, 2/32, 13 gpg, oil 4%, sd
3/4%, sld 14, P.H. 9.1, P.F. .75. Surveys: 5360' - i 3/4;
5502' - 2% deg; 5612' - 3 deg.
Bit #12, HTC X-3, 17% hfs, 261', 2 12/32, 1 13/32 jets, 52 spm,
390 gpm, 2500 pressure, 20-32,000 wt, 100 rpm.
Finished GIH, reamed from 5236' to bottom, 115'. Drilled to
5508' made survey, picked up through coal section, no drag,
,
now DA.
7-29 -67
21st day. TD 5691'. Siltstone & coal. Made 79' last 24 hrs.
Mud lO.6#/gal, viscosity 42, W.L. 3.6, 2/32, 18 gpg, oil 3%,
sd ~, sld 12, P.H. 10.2, P.F. 1.2, Survey ~ 5671' - 3 deg~
Bit #12, HTC X-3, 27% hfs, 332', 2 12/32, 1 13/32 jets, 52 spm,
390 gpm, 2500 pressure, 10,000 wt, 100 rpm. Bit washed out.
Bit #13, HTC X-3, 1 hr, 8', 2 12/32, 1 13/32 jets, 66 spm, 495
gpm, 2300 pressure, 10,000 wt, 100 rpm.
At 5683' started loosing pump pressure & gained pump strokes
POH, found center of bit washed out. Layed down 8 DC's that
had not been magnafluxed & picked up 6 DC that had been. WIH,
bottom hole assembly: bit, bit sub, 2 DC, stabilizer, 2 DC,
stabilizer, 4 DC, rubber stabilizer, 4 DC, rubber stabilizer,
4 DC, stabilizer, crossover sub, shaffer-wagner safety bumper~
sub, & oil jars.(498.45') 42,000 lbs. Now DA.
7 -30 -67
22nd day. TD 5860'. Siltstone & coal. Made 169' last 24 hrs.
Mud lO.6#/gal, viscosity 42, W.L. 3.6, 2/32, 18 gpg, oil 3~,
sd %%, sld 12, yld 3, P.H. 10.2, P.F. 1.2. Surveys: 5763' -
2~ deg; 5855' - 2 deg plus.
Bit #13, HTC X-3, 24 hfs, 177', 2 12/32, 1 13/32 jets, 66 spm,
495 gpm, 2300 pressure, 10,000 wt, 100 rpm.
7-31-67
23rd day. TD 5933'. Siltstone & coal. Made 73' last 24 hrs.
Mud lO.5#/gal, viscosity 41, W.L. 4, 2/32, 20 gpg, oil 3~, sd
3/4~, sld 12, P.H. 10.2, P.F. 1.2. Survey ~ 5933' -2 deg.
Bit #13, HTC X-3, 37% hfs, 250', 2 12/32, 1 13/32 jets, 65 spm,
495 gpm, 2300 pressure, 10,O00 wt, 100 rpm, T-2, B-2, I.
Bit #14, Reed, ST-3A
Drilled to 5933' made survey, & POH. Picked up bit, circle-C-
assembly; 1 DC; circle-C stabilizer, 3 DC, s~abilizer, 3 DC,
rubber stabilizer, 3 DC, rubber stabilizer, oil jars, 3 DC,
switch sub, bumper sub. WIH to shoe. Down 3% hrs changing
linkage on brake & installing crown-o-matic. Now GIH.
8-1-67
24th day. TD 6269'. Siltstone & coal. Made 336' last 24
hrs. Mud lO.6#/gal, viscosity 40, W.L. 3.6, 2/32, 20 gpg,
oil 2%, sd ~, sld 15, yld 2, P.H. 10.2, P.F. .85. Surveys:
6000' - 1 3/4 Deg; 6123' - 1% deg.
Bit #14, Reed ST-3A, 18% hfs, 336', 3 12/32 jets, 65 spm,
490 gpm, 2400 pressure, 30,000 wt, 100 rpm, T-6, B-2, YS.
Drilled to 6269'. Now POH.
8-2-67
25th day. TD 6614'. Siltstone & hard sand. Made 345' last
24 hrs. Mud lO.7#/gal, viscosity 38, W.L. 4.0, 2/32, 20 gpg,
oil 2%, sd 3/4%, sld 12, yld 2, P.H. 9.8, P.F. .7. Surveys:
6330' - 1 3/4 deg; 6450' - 1 3/4 deg; 6575' - 1;3/4 deg.
Bit #15, Sec S-3, 21 hfs, 345", 3 12/32 jets~ 65 spm, 495 gpm,
2400 pressure, 35,000 wt, 100 rpm.
WIH O.K. Now DA.
8-3 -67
26th day. TD 6868'. Siltstone, sand & coal. Made 254' last
24 hrs. Mud lO.8#/gal, viscosity 40, W.L. 4.0, 2/32, 20 gpg,
oil 2%, sd 1%~ sld 12, P.H. 9.8, P.F..7. Surveys: 6676' -
1 3/4 deg; 6773' - 2 deg.
Bit #15, Sec S-3, 25 hfs, 407', 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure, 25-35,000 wt, 100 rpm, T-5, B-8, OY8.
Bit #16, HTC X-3, 12% hfs, 192', 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure~ 25-35,000 wt, 100 rpm.
Drilled to 6676' made trip for new bit, now DA
8-4 -67
27th day. TD 7051'. Sand, siltstone & coal. Made 183' last
24 hrs. Mud 10.8#/gal, viscosity 41, W.L. 3.8~ 2/32, 20 gpg,
oil 2%, sd 1~, sld 12, P.H. 9.8, P.F. .6. Surveys: 6890' -
1 3/4 deg; 7004' - 2 deg.
Bit #16, HTC X-3, 24% hfs, 328', 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure~ 30,000 wt, 100 rpm, T-6, B-4, 1/8.
Bit #17~ Sec S-3, 2% hrs,~ 46'~ 3 12/32 jets, 65 spin, 490 gpm,
2400 pressure, 20-25,000 wt, 100 rpm.
Drilled to 7004', dropped Totco, POH.
8-5 -67
28th day. TD 7288'. Siltstone, sand & coal. Made 277' last
24 hrs. Mud lO.9#/gal, viscosity 38, W.L. 4.4, 2/32, 18 gpg,
sd 3/4~, sld 14~ Survey ~ 7270' - 2% deg.
Bit #17, Sec S-3, 18% hfs, 266', 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure, 30,000 wt, 1OO rpm, T-6~ B-4, I.
Bit #18, HTC X-3, 1% hfs, 18t, 3 13/32 jets, 65 spm~ 490 gpm,.
2400 pressure~ 20,000 wt~ 100 rpm.
Drilled to 7270'. Made trip for new bit O.K. Now drilling~
ahead w/Bit #18.
8-6-67
29th day. TD 7482'. Siltstone, hard sand & cong. Made 194'
l~st 24 hrs~ Mud ll.O#/9al; viscosity 41; W.L. 4.4; 2/32~ 18
gpg, 1%-% sd, sld 14%, yld 4, P.H. 10.2, P.F. 1.0. Survey ~
7420' - 2% deg.
Bit #18, HTC X-3, 15% hfs, 158'~ 3 12/32 jets~ 52 spm, 395 gpm,
2500 pressure~ 20-30~000 wt, 100 rpm, T-4, B-4, I.
Bit #19, HTC X-3, 6 hfs, 54', 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure, 30,000 wt, 100 rpm.
Drilled to 7428'. Two jets on bit plugged. POH, changed
bits. WIH o.k. Now DA.
8-7-67
30 days. TD 7612'. Siltstone, hard sand & coal. Made 130'
last 24 hrs. Mud ll.O#/gal, viscosity 38, W.L. 4.2, 2/32,
15 gpg, oil iR, sd 1~, sld 14, yld 3, P.H. 9.6, P.F. .45.
Surveys: 7546' - 2 deg~ 7612' - 2% deg.
Bit #19, HTC X-3, 21%h rs, 184,, 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure, 25-35,000 wt, 100 rpm, T-6, B-2, I.
Drilled to 7612', made survey, POH. Now changing bits.
8-8-67
31 days. TD 7885'. Siltstone & sand. Made 273' last 24 hrs.
Mud ll.O#/gal, viscosity 40, W.L. 4.4, 2/32, 15 gpg, oil iR,
sd 1~, sld 13, yld 4, P.H. 9.6, P.F. .3~ Survey ~ 7730' - 2 deg.
Bit #20, Reed ST-3, 19 hrs, 273', 3 12/32 jets, 65 spm, 490
gpm, 2400 pressure, 25-40,000 wt, 100 rpm.
Finished going in hole O.K. Now DA.
8-9-67
32 days. TD 8067'. Siltstone, sand & coal. Made 182' last
24 hrs. Mud ll.O#/gal, viscosity 42, W.L. 4.2, 15 gpg, oil
IR, sld 13, P.H. 9.4, P.F. .2. Survey ~ 7947' - 2% deg.
Bit #20, Reed ST-3, 25% hrs, 335', 3 12/32 jets, 65 spm, 490
gpm, 2400 pressure, 30-40,000 wt, 100 rpm, T-5, B-3, 0~.
Bit #21, Sec S-3T, 10 hfs, 120', 3 12/32 jets, 65 spm, 490
gpm, 2400 pressure, 15-30,000 pressure, 100 rpm.
Drilled to 7947', made survey, made trip for new bit, Now DA.
8-10-67
33 days. TD 8158'. SS, siltstone & coal. Made 82' last 24
hrs,- Mud ll..0#/gal, viscosity 41, W.L. 4.8, 2/32, 15 gpg,
oil 1%, sd 1%, sld 12~, P;H. 9, P.F..2. Surveys: 8130' -
2 deg; 8158' - 2 deg.
Bit #21, Sec S-3T, 16 hrs, 202', 3 12/32 jets, .65 spm, 490 gpm,
2400 pressure, 15-30,000 wt, 100 rpm, T-5, B-3, 3/8".
Drilled to 8158' corrected, made 12 std short trip, circulated
1% hrs, dropped Totco, POH. Rigged up Schlumberger, ran IES,
sonic logs. Now running gamma ray density log. Sch TD 8161'.
8-11-67
34 days. TD 8276'. Siltstone, sand, & coal. Made 118' last
24 hrs. Mud ll.O#/gal, viscosity 42, W.L. 4.6, 2/32, 17 gpg~
oil 1~, sd 1%, sld 13, yld 6, P.H. 9.5, P.F. .2.
Bit #22, Reed ST1AG, 12% hrs, 118', 3 12/32 jets, 65 spm, 490
gpm, 2500 pressure, 20-30,000 wt, 100 rpm.
Finished running gamma ray density log, ran C.D.M. Rigged
down Schlumberger unit, 18 hrs total log time. WIH, circulated
30 minutes, now DA.
8-12-67
35 d~¥s, TD 8389'. Siltstone & coal. Made 113' last 24 hrs.
Mud ll.l#/gal~ viscosity 42, 4.8~ 2/32~ 14 gpg, oil 1~, sd 1~,
sld 14, yld 6, P.H. 9.0, P.F. 1.O. Survey ~ 8376' - 1 3/4 deg.
Bit #22. Reed ST1AG, 30 hrs. 218', 3 12/32 jets, 65 spm, 490
gpm~ 2500 pressure, 35000 w~ 100 rpm, T-5~ B-5, I.
Bit '~23, HTC XlG~ 1 hr, 13', 3 12/32 jets,
2400 pressure, 25~000 wt~ 100 rpm.
Made trip ~ 8376' O.K. Now DA.
65 spm, 490 gpm,
8-13-67
36 days. TD 8664'. Siltstone, sand & coal. Made 275' last
24 hrs. Mud ll.O#/gal, viscosity 42, W.L. 4.2~ 2/32, 17 gpg~
oil 1~ sd 1~, sld 13~ yld 5, P.H. 9.5, P.F. .2.
Bit #23 HTC XlG~ 28% hrs, 288'~ 3 12/32 jets~ 65 spm, 490 gpm,
2500 pressure, 25-35,000 wt~ 100 rpm.
Now DA ~ 6'/hr w/Bit #23.
8-14-67
37 days. TD 8796'. Siltstone, sand & coal. Made 171' last
24 hrs. Mud ll.O#/gal, viscosity 42, W.L. 5.2~ 2/32, 17 gpg,
oil 1~ sd 1~ sld 14, yld 8~ P.H. 9.5~ P.F. .15. Survey ~
8668' - 2 deg.
Bit #23, HTC XlG~ 29% hfs, 292', 3 12/32 jets, 65 spm, 490 gpm,
2400 pressure, 25-30,000 wt~ 100 rpm~ T-5, B-M, 1/8".
Bit #24, HTC XlG~ 12 hrs, 128', 3 12/32 jets, 65 spm~ 490 gpm,
2500 pressure~ 25-35~000 wt~ 100 rpm,
Made trip ~ 8668' Go change bi~s. Now DA w/Bit #24.
8-15-67
38 days. TD 8904'. Sand & siltst~ne. Made 108' last 24 hrs.
Mud ll.O#/gal, viscosity 40~ W.L' 4.7~ 2/32, 23 gpg, oil 1%,
sd 1~ sld 13~ P.H. 9.5, P.F. .3. Survey ~ 8884' - 1% deg.
Bit #24, HTC XlG~ 26% hfs, 214', 3 12/32 jets, 65 spin, 490 gpm,
2400 pressure, 35~000 wt, 100 rpm, T-5~ B-B, 1/8".
Bit #25, Reed ST1AG, 2% hrs~ 22', 3 12/32 je~s, 65 spm~ 490 gpm~
2400 pressure, 30,000 wt, 100 rpm.
Drilled to 8882', made survey & made trip for new bit. Now DA
w/Bi~ #25.
8-16-67
39 days. TD 9106'. Sil~stone, sand & coal. Made 202' las~
24 hrs. Mud ll.O#/gal, viscosity 44~ W.L. 4.6, 2/32, 17 gpg~
oil 2~ sd 1~, sld 14~ P.H. 9.5, P.F. .3.
Bit #25, Reed STIAG, 25% hrs~ 224', 3 12/32 jets, 65 spm, 490
gpm~ 2400 pressure~ 30-35,000 wt~ 100 rpm.
Now DA w/Bit #25.
8-17-67
40 days. TD. 9268'. Siltstone, sand & coal. Made 162' last
24 hrs. Mud ll.O#/gal, viscosity 44~ W.L. 4.4, 2/32, 20 gpg,
oil 1%~ sd 1~, sld 17, P.H. 9.8~ P.F. .8. Survey ~ 9128' -
2 deg.
Bit #25, Reed ST1AG, 27% hrs~ 246', 3 12/32 jets, 65 spm~ 490
gpm~ 2400 pressure, 30-35,000 wt~ 100 rpm~ T-6, B-6, I.
Bit #26~ HTC XlG~ 14 hrs~ 140', 3 12/32 jets~ 65 spm~ 490 gpm,
2400 pressure, 20-32000 wt~ 100 rpm.
Drilled to 9128' made trip O.K Now DA
8-18-67
41 days. TD 9383'. Siltstone, sand & coal Made 115' last
24 hfs. Mud 10.9#/gal; viscosity 44~ W.L. ~.0~ 1/32~ 2Z gPD~
oil 1%~ sd 1~, sld 16, yld 11, P.H. 10.0~ P.F. 1.2. Survey ~
9383! - 2 deg.
Bit ~26~ HTC X1G, 29% hrs~ 255'~ 3 12/32 jets, 62 spm~ 465 gpm,
2400 pressure~ 35,000 wt, 100 rpm, T-5, B-2, 01/8.
Drilled to 9383', made survey, POH. Magnafluxed DC & bottem
hole assembly· All O.K. Changed bits. Now GIH.
8-19-67
42 days. TD 9636'. Sand, coal & SS. Made 253' last 24 hrs.
Mud 10.9#/gal, viscosity 40, W.L. 4.2, 1/32, 20 gpg, sd 1~,
sld 14, yld 5, P.H. 10, P.F. 1.0.
Bit #27, HTC X1G, 21 hfs, 253', 3 12/32 jets, 48 spm, 360, gpm,
2500 pressure, 30-40,000 wt, 100 rpm.
Now DA.
8-20-67
43 days. TD 9755'. Siltstone & hard sand. Made 119' last 24
hrs. Mud ll.O#/gal, viscosity 39, W.L. 4.2, 1/32, 20 ~ oil
1%, sld 14, yld 5, P.H. 10, P.F. 1.0. Survey ~ 9649' ~P deg.
Bit #27, HTC XlG, 23% hfs, 266' 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 30-40,000 wt, 100 rpm, T-6, B-6, %.
Bit #28, Reed ST1AG, 13 hfs, 106' 3 12/32 jets, 62 spm, 465
gpm, 2400 pressure, 25-35,000 wt, 100 rpm.
Made trip ~ 9649' changed 2 Driltrol blades Had to ream
last 30' to bottom.
8-21-67
44 days. TD 9855'. Siltstone & coal. Made 100' last 24 hrs.
Mud ll.0#/gal, viscosity 40, W.L. 4.0, 2/32, 20 gpg, sd 3/4%,
sld 14, P.H. 10, P.F..9. Survey ~ 9771' - 3% deg.
Bit #28, Reed ST1AG, 16 hfs, 122' 3 12/32 jets, 62 spm~ 465
gpm, 2400 pressure, 30-36,000 wt, 100 rpm, T-6, B-2, 1/8".
Bit #29, Sec M4NG, 14 hrs, 84' 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 15-20,000 wt, 100 rpm.
Drilled to 9771', made survey, made trip for new bit. Now DA
w/Bit #29.
8-22-67
45 days. TD 9988'· Hard sand & quartz. Made 133' last 24 hrs.
Mud lO.9#/gal, viscosity 40, W.L. 4.2, 2/32 jets, 20 gpg, sd
3/4~, sld 16, P.H. 10.5, P.F. !~0. Survey ~ 9931' - 3 deg.
Bit #29, Sec M4NG, 22 hfs, 160' 3 12/32 jets, 62 spm, 465 gpm,
2300 pressure, 18-30,000 wt, 100 rpm.
Drilled to 9931' made survey & trip for new bit Now DA
, · ·
8-23-67
46 days. TD 10,096'. Siltstone, sand & coal· Made 108' last
24 hfs, Mud 10.9#/gal, viscosity 43, W.L. 4.2, 20 gpg, sd 3/4%,
sld 15, P.H. 10, P.F 1.0. Survey ~ 9996' - 3 deg.
Bit #30, Reed ST1AG, ll%hrs, 65', 3 12/32 jets, 62 spm, 465 gpm,
2300 pressure, 18-35,000 WZ~100::~pm, T-7, B-2, 1/8".
Bit #31, Sec M4NG, 15% b_rs, 100', 3 12/32 jets, 62 spm, 465 gpm,
2300 pressure, 20-30,000 wt, 100 rpm.
Drilled to 9996' made survey & trip for new bit Now DA
8-24-67
47 days. TD 10,179'. Hard sand, quartz & coal. Made 83' last
24 hrs. Mud lO.9#/gal, viscosity 40, W.L. 4.0, 1/32, 25 gP9,
sd 3/4~, sld 15, yld 10, P.H. 10, P.F. .8, Survey ~ 10,108' -
2 3/4 deg.
Bit #31, Sec M4NG, 17 hrs, 112' 3 12/32 jets, 62 spm, 465 gpm,
2300 pressure, 20-30,000 wt, 100 ~pm, T-6, ~4, 0%.
Bit #32, HTC XV, 6 hfs, 37', 3 12/32 jets~ spm, 465 gpm,
2300 pressure, 20-30,000 wt, 100 rpm, T-6, B-2, I. Gauge
teeth heeled off.
Bit #33, HTC XD-7, 4 3/4 hfs, 37t, 3 12/32 jets, 62 spin,
465 gpm, 2300 pressure, 20-30,000 wt, 60-100 rpm.
Tripped ~ lO,108*& 10,145' to change bits & Shaffer-wagner
jr. Now DA.
8-25-67
48 days. TD 10,253'. Hard sand & siltstone. Made 74' last
24 hrs. Mud ll.O#/gal~ viscosity 45, W. L. 4.2~ 1/32, 25gpg,
sd 3/4%~ sld 15, yld 16, P.H. 9.5, P.F. .6. Survey ~ 10,204' -
2% deg.
Bit #33, HTC XD-7, 10% hfs, 59', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 30~000 wt, 80 rpm~ T-6~ B-2, I.
Bit #34~ Reed YHG~ 10 hrs~ 49', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure~ 30~000 wt~ 100 rpm.
Made trip ~ 10,204' O.K. Now DA.
8-26-67
49 days. TD 10,355' Hard sand, quartz & coal. Made 102'
last 24 hrs. Mud ll~O#/gal, viscosity 45, W.L. 3.8, 1/32,
23 gpg, sd 3/4~, sld 14, yld 10, P.H. 9.5, P.F..7. Survey
~ 10,278' - 2 3/4 deg.
Bit W34, Reed YHG, 16 hrs~ 74', 3 12/32 jets~ 62 spm, 465 gpm,
2400 pressure, 35,000 wt, 100 rpm, T-6, B-4~ I.
Bit #35, Sec M4NG, 12 hrs~ 77'~ 3 12/32 jets, 60 spm, 450 gpm,
2400 pressure, 30,000 wt, 75 rpm.
Drilled to 10,278' made trip O.K. Now DA
, ·
8-27-67
50 days. TD 10,426'. Siltstone & sand. Made 71' last 24 hrs.
Mud ll.O#/gal, viscosity 45, W.L. 3.8, 2/32, 70 gpg, sd 3/4~,
sld 17~ P.H. 10.5, P.F..9. Surveys: 10,371' - 2 3/4 deg;
10,416' - 2% deg.
Bit #35, Sec M4NG~15% b_rs, 93', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure~ 30~000 wt, 100 rpm, T-7~ B-3, I.
Bit #36~ Sec M4NG, 8% hrs~ 45t, 3 12/32 jets, 62 spm, 465 gpm,
2300 pressure, 20-25,000 wt, 100 rpm.
Made trip for new bit ~ 10,371' & 10,416'. Now DA.
8-28 -67
51 days. TD 10,490'. Siltstone & sand. Made 64' last 24 hrs.
Mud ll.0#/gal, viscosity 44, W.L. 3.6, 2/32, salt 70 gpg, sd
1~, sld 14, P.H. 11, P.F. 1.O. Survey ~ 10,453' -3 deg.
Bit #37, Reed YHG, 9% hfs, 37', 3 12/32 jets~ 62 spm~ 465 gpm,
2400 pressure, 30-33,000 wt, 100 rpm~ T-4, B-3, I.
Bit #38, Sec S4TG, 7 hfs, 37', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 20-25,000 wt, 100 rpm.
Made trip (~ 10,453' for new bit. Now DA w/Bit #38.
8-29-67
52 days. TD 10,568'. siltstone. Made 78' last 24 hrs. Mud
ll.O#/gal, viscosity 45, W.L. 3.8, 2/32, salt 20 gpg, sd l%t
sld 15, P.H. 10.5, P.F. .8. Survey ~ 10~554' - 2% deg.
Bit #38, Sec S4TG, ZO%~hrs~.-~ii~l~l', 3 12/32 jets, 62 spm, 465
gpm~ 2400 pressure, 20-30~O00 wt, 100 rpm, T-5~ B-3~ I.
Bit #39, Sec S4TG, 3 hfs, 14', 3 12/32 jets~ 62 spm~ 465 gpm,
2400 pressure, 20-30,000 wt, 100 rpm.
Drilled to 10,554'. Made trip for new bit.
8-30-67
53 days. TD 10,680'. Sand & shaley coal. Made 112' last 24
hrs. Mud ll.O#/gal, viscosity 46, W.L. 3.5, 2/32, 25 gpg, sd
3/4%, sld 15, yld 13, P.H. 10.5, P.F. .8.
Bit #39, Sec S4TG, 25 3/4 b_rs, 126', 3 12/32 jets, 62 spm, 465
gpm, 2400 pressure, 20-32,000 wt, 80 rpm.
Now DA.
8-31-67
54 days. TD 10,685'. Siltstone & coal. Made 5' last 24 hrs.
Mud ll.l#/gal, viscosity 43, W.L. 3.2, 2/32, 25 gpg, sd 3/4~,
sld 15~ yld 10, P.H. 10, P.F. .8. Survey ~ 10,685' - 3 deg.
Bit #39, SeN S4TG, 27 hfs, 131', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 32~O00 wt, 80 rpm~
Drilled to 10~685' made 15 stand short trip, circulated out
, ·
POH, rigged up Schlumberger unit. Ran IFS log. Ran sonic caliper
to 7550', sat on ledge, worked by O.K. Caliper quit working ~
7600'. POH. Bottom 5' of caliper had backed off. PU 8 5/8"
overshot dressed w/5" grapple and mill control. WIH to TD, h~
indications of going over fish on bottom. POH, did not have
fish. WIH w/bit & regular drilling hookup to 10,680'. Now
picking up kelley.
9-1-67
55 days. TD 10,685'. Made zero footage last 24 hrs. Mud 11.0#/
gal, viscosity 50, W.L. 3.8, 2/32, 25 gpg, sd %~, sld 17, yld
11, P.H. 9.4, P.F. .5.
Circulated out ~ 10~680'. POH & picked up Tri-State 9" junk
basket w/9%" shoei~ oil jars, 15 DC's & Shaffer Wagner bumper
sub. Washed & rea~ed from 10677' to 10,685'. Circulated out.
POH~ no recovery. Rigged up Schlumberger unit. Ran sonic
caliper & formation density log to TD of 10,664'. Now running
dipmeter, no indication of junk.
9-2-67
56 days. TD 10,710'. Siltstone & sand. Made 25' last 24 hrs.
Mud lO.9#/gal, viscosity 48, W.L. 3.2, 2/32, salt 27 gpg, sd
%~, sld 17, P.H. 10, P.F. .7.
Bit #40, HTC WTR, 5 hrs, 25', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 20,000 wt, 100 rpm, T-l, B-l, I.
Bit #41, Sec, S4TG.
Finished running CDM. Ran 3 sample guns, lost 2 bullets ~
6060' - 10,180'. Rigged down Schlumberger. Picked up bit,
15 DC's & oil jars. WIH, no junk on bottom. Drilled to
10,710'. Made trip for bit, started to drill & pipe stuck.
9-3 -67
57 days. TD 10,710'. Made zero footage last 24 hrs. Mud
ll.O#/gal~ viscosity 44, W.L. 3.2, 2/32, salt 30 gpg, sd
sld 17, P.H. 10.2, P.F. 1.0.
Bit #40 rerun 1% hr on junk.
Bit #42, Reed, YH6.
Continued to work pipe max pull of 380,000# up and jarring down.
Pipe came free ~ 7:30 am 9-2-67. POH, bit showed indication of
junk being around it. WIH with WTR bit, boot basket, 6 DC's,
oil jars & SWBJ. Drilled on junk 1% hrs. Circulated out, POH.
Recovered 10~ lbs of junk. Picked up 7 7/8" X 8 3/4" Bowen
reverse circulating junk catcher w/same bottom hole hook-up.
WIH, washed down to bottom~ cut 1' core, POH, no recovery. Picked
up bit #42, boot basket, circle-C-assembly, 1 DC, circle-C-stab,
DC, stabilizer, B DC, stabilizer, 3 DC, rub'~r stabilizer,
DC, oil jars, 2 DC, stabilizer, 4 DC, stabilizer, switch sub,
Shaffer Wagner bumper sub, Now GIH to drill ahead.
9 -4 -67
58 days. TD 10,764' Sand & siltstone. Made 54' last 24 hrs.
Mud ll.O#/gal, viscosity 45, W.L. 3, 2/32, salt 30 gpg, sd
l~z%, sld 17, yld 10.2, P.H. 10, P.F. 1. Survey ~ 10,750' -3
deg.
Bit #42, Reed YHG, 9~ hfs, 40', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 20-30,000 wt, 80 rpm, T-6, B-3, I.
Bit #43, Sec, M4N, 3~ hfs, 14', 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 25,000 wt, 80 rpm.
While going in hole had to ream 30' to bottom. Drilled to
10,750', made trip for new bit. Now DA.
9-5-67
59 days. TS 10,863'. Siltstone, sand & shale. Made 99' last
24 hrs. Mud ll.O#/gal, viscosity 43, W.L. 3, 2/32, salt 50
gpg, sd 1~, sld 16, yld 8, P.H. 10.2, P.F. 1.2. Survey ~
10,863t - 3 deg.
Bit $43, Sec, M4NG, 18 hfs, 113', 3 12/32 jets, 62 spm, 465
gpm, 2400 pressure, 20-30,000 wt, 85 rpm, T-5,B-4, o %.
Drilled to 10,863', POH, changed bits, layed down oil jars,
now GIH.
9-6-67
60 days. TD 10,940' Siltstone & hard sand. Made 77' last
.24 hrs. Mud ll.0#/g21, viscosity 45, W.L. 3.4~ 2/32, sd 1~,
s~ld 16, P.H. 10.2, ?.F. 1.2.
Bit #44, HTC OWV, 10~ hrs, 54', 3 12/32 jets, 62 spin, 465
gpm, 2400 pressure, 35,000 wt, 80 rpm, T-5, B-B, I.
Bit #45, Sec M4NG, 5 hrs, 23'~ 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 30,000 wt, 100 rpm.
Made trip ~ 10,917'. Now DA.
9-7-67
61 days. TD 11,007'. Siltstone & shale. Made 67' last 24
hrs. Mud ll.l#/gal, viscosity 44~ W.L. 3, 1/32, salt 40 gpg,
sd 1~%, sld 18, P.H. 10, P.F. 1. Survey ~ 11,000' - 3 deg.
Bit #45, Sec, M4NG, 21 hrs, 87', 3 12/32 jets, 62 spm, 465
gpm, 2400 pressure, 30,000 wt, 95 rpm, T-4, B-4, I.
Bit #46, HTC, X1G, ~ hr, 3'!.
Drilled to 11,004', made survey, POH. Tested hydril, pipe
rams & choke manifold to 3000 psi O.K. WIH, now DA.
9 -8 -67
62 days. TD 11,147' Siltstone, sand & coal. Made 140' last
24 hfs. Mud ll.O#/g21, viscosity 44, W.L. 2.8, 2/32, salt 40
gpg, sd 1%~, sld 18, P.H. 10.2, P.F 1.2.
Bit #46, HTC, XlG, 23 hfs, 143'~ 3 12/32 jets, 62 spm~ 465 gpm,
2400 pressure, 30,000 wt, 95 rpm.
Drilled to 11,147. Now POH.
9-9-67
63 days. TD 11.241'. Sandy siltstone. Made 94' last 24 hrs.
Mud ll.l~/9al; viscosity 44; W.L. 3, 1/32~ salt 35 gpg~ sd 1~
sld 18, yld 10, P.H. 10.1, P.F 1.1. Survey ~ 11~147' -3 deg.
Bit #47, HTC XlG, 15 hfs, 94', 3 12/32 jets, 62 spm~ 460 gpm,'
2400 pressure, 25-30~000 wt, 95 rpm.
Finished trip for new bit. Now DA~.
9-10-67
64 days. TD 11,358'. Hard sand & siltstone. Made 163'
last 24 hrs. Mud ll.O#/gal, viscosity 43~ W.L. 3.4~ 2/32,
salt 40 gpg, sd 1~, sld 17, yld 11, F.H. 10.3, P.F 1.3.
Survey ~ 11,310' - 3 deg.
Bit #47, HTC XlG~ 26 hrs, 163'~ 312/32 jets, 62 spin, 465
gpm, 2400 pressure~ 30,000 wt, 95 rpm, T-4, B-5, 03/8.
Bit #48, Reed ST1AG~ 10~ hfs, 48', 312/32 jets, 62 spin,
465 gpm, 2400 pressure, 30,000 wt, 95 rpm.
Drilled to 11,310' made survey Made trip for new bit O.K
, · ·
Now DA.
9-11-67
65 da:ys. TD 11,445'. Hard sand, ~ shale, siltstone & coal.
Made 87' last 24 hrs. Mud ll.O#/gal~ viscosity 44, W.L. 2.8,
2/32, salt 40 gpg, sd 1~, sld 16, yld 10, P.H. 10, ?.F. 1.
Survey ~ 11,381' - 3 deg.
Bit #48~ Reed ST1AG~ 15~ hrs~ 71', 312/32 jets, 62 spin, 465
gpm, 2400 pressure, 35,000 wt, 95 rpm, T-3, B-2, I.
Bit #49, HTC XlG, 8 hrs, 65', 312/32 jets~ 62 spin, 465 gpm,
2400 pressure, 30,000 wt~ 90 rpm.
Made trip ~ 11,381' for new bit O.K. Now DA.
9-12-67
66 days. TD 11,503'. Siltstone, sand & shale· Made 68' last
24 hrs. Mud ll.O#/gal, viscosity 44, W.L. 2.7, 2/32, salt 40
gpg~ sd IR, sld 16~ yld 11, P.H. 10, P.F. 1. Survey ~
11,503~ - 3 deg.
Bit #49, HTC XlG, 20 hrs, 122', 312/32 jets, 62 spm, 465 gpm,
2400 pressure~ 40,000 wt, 75 rpm, T-4, B-3, o 1/8.
Bit #50, HTC XlG.
Drilled to 11,503', made survey, ?OH. Magna£1uxed all DC's
& stabilizers· Had one bad connection on Drilco stabilizer.
Cut drill line. Now GIH.
9-13-67
67 days. TD 11,602'. Sand & siltstone. Made 99' last 24 hrs.
Mud ll.O#/gal, viscosity 43, W.L. 2.8, 2/32, salt 40 gpg, sd
1%, sld 16~, yld 11, P.H. 10, P.F. 1. Survey ~ 11,602' - 3 deg.
Bit #50~ HTC XlG~ 18 hfs, 99'~ 312/32 jets, 62 spm, 465 gpm,
2400 pressure, 40~000 wt, 80 rpm, T-6, B-3, o 1/8.
Bit #51, HTC XDG.
Drilled to 11,602', made survey, POH. Changed bits, now GIH.
9-14-67
68 days. TD 11,696'. Siltstone & sand. Made 94' last 24 hrs.
Mud ll.O#/gal, viscosity 47' W,~L. 3, 2/32, salt 40 gpg, sd 1~,
sld 15, yld 10, P.H. 10.4, P.F. 1.2. ·
Bit ~51, HTC XDG, 18~ hfs, 94' 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40,000 wt, 85 rpm.
Finished trip for new bit. Drilled to 11,696'. Now POH.
9-15-67
69 days. TD 11,785'. Siltstone, sand & coal. Made 89'
last 24 hrs. Mud ll.O#/gal~ viscosity 48, W.L. 3, 2/32,
salt 40 gpg, sd 1~%~ sld 18~ yld 14~ P.H. 10.2, P.F .9.
Survey ~ 11,696' - 3 deg.
Bit #52, HTC XVG. 17 hrs~ 89''53812/32 jets, 62 spm, 465 gpm,
2400 pressure, 30-40,000 wt~ rpm.
Made trip for new bit ~ 11,696'. Left all bearings out of
two cones in the hole. Picked up boot basket below regular
bottom hole hookup. WIH. Now DA.
~.9-16-67
70 days. TD 11,859'. Siltstone & claystone, & hard sand.
Made 74' last 24 hrs. Mud ll.O#/gal, viscosity 47, W.L. 3,
2/32, salt 40 gpg, sd 1~, sld 17, yld 12, P.H. 10.3,
.8. Survey ~ 11,786' - 3 deg.
Bit #52, HTC XDG, 17~ hfs, 90', 3 12/32 jets, 62 spin, 465
gpm, 2400 pressure, 30-35,000 wt, 90 rpm, T-5, B-6, I.
Bit #53, HTC XV, 15 hrs, 74', 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 40,000 wt, 80-95 rpm.
Drilled to 11,786', made survey, POH. Recovered several bit
bearings, layed down bOOt basket. WIH O.K. Had 12' of fill.
Now DA ~ 4-5'/hr.
_9-17-67
71 days. TD 11,925'. Siltstone, sand & coal. streaks. Made
66' last 24 hrs. Mud !0.9#/gal, viscosity 47, W.L. 3.2, 2/32,
salt 40 gpg, sd 1%~, sld 17, yld 12, P.H. 10.2, P.F 1.0.
Survey ~ 11,885' - 3 deg.
Bit #53, HTC XV, 21~ hfs, 99', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40,000 wt, 90 rpm, T-6, B-6, I.
Bit #54, Reed ST1AG, 14 hfs, 65', 3 12/32 jets, 62 spin, 465
gpm, 2400' pressure, 32,000 wt, 70 rpm.
Made trip ~ 11,885'. Hole O.K. Had 12' of fill. Now DA.
ii. 9-18-67
· 993' Siltstone, sand & coal. Made 68' last
72 days TD 11, ~
24 hrs. Mud lO.8#/g 1, viscosity 41, W.L. 3.2, 2/32, salt 35
gpg, sd 1~, sld 16, yld 8, P.H. 10.2, P.F .9. Survey ~ 11,993' -
3 deg.
Bit #54, Reed ST1AG, 22~ hfs, 108', 3 12/32 jets, 62 spm, 465
gpm, 2400 pressure, 38,000 wt, 70-90 rpm, T-6, B-8, I. Lost
bearings out of two cones.
Drilled to 11',993', made 15 std short trip. Circulated out,
made survey, POH. Rigged up Schlumberger, ran CDM. Now POll.
~_9-19-67
73 days. TD 12,032'. Siltstone & sand. Made 39' last 24 hrs.
Mud lO.8#/gal, viscosity 43, W.L. 3.4, 2/32, salt 35 gpg, sd
1~%, sld 16, yld 5, P.H. 10.4, P.F 1.2.
Bit #55, HTC XV, 8~ hrs, 39', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 30-40,000 wt, 54-85 rpm.
Ran IES log to TD, tool failed, POH. Reran IES to 3000', tool
failed. POH, repaired tool, finished running IES. Ran core
gun, made 21 shots, left 9 bullets in hole. WIH with bit &
boot basket and same bottom hole assembly. Worked on junk 1
hr. Hole cleaned up. Now DA.
ii.9-20-67
74 days. TD 12,108'. Siltstone, sand & coal. Made 76' last
24 hrs. Mud 10.9#/gal, viscosity 46, W.L. 3.4, 2/32, salt 35
gpg, sd 1~, sld 16, yld 8, P.H. 10.4, P.F. 1.2.
Bit #55, HTC XV, 17 hrs, 68', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40,000 wt, 54 rpm, T-6~ B-4, I.
Bit #56, Sec S4J, 7~ hfs, 47', 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 35,000 wt, 80 rpm.
Drilled to 12,061'. Dropped Totco, made trip for new bit.
Recovered 3 piece~ of core bullets in boot basket. Reran boot
basket. Had indications of junk on bottom. Cleaned up. Now
DA w/Bit #55. Had 16-17' of fill.
9-21-67
75 days. TD 12,176' Siltstone. Made 68' last 24 hrs. Mud
ll.0#/gal, viscosity 51, W.L. 3, 2/32, salt 35 gpg, sd
sld 16, yld 8, P.H. 10.1, P.F. 1.2. Survey ~ 10,141 - 3 deg.
Bit ~.56, Sec S4J, 13 hfs, 80', 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 38,000 wt, 80 rpm, T-6, B-6, I.
Bit #57, HTC XlG, 8 hrs, 37', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 80 rpm~ 38,000 wt.
Drilled to 12,141' made trip for new bit Now DA
, · ·
9-22-67
76 days.' TD 12,243'. Siltstone & shale. Made 67' last 24 hrs.
Mud ll.0#/gal, viscosity 55, W.L. 3.1, 2/32, salt 35 gpg~ sd
1~%~ sld 18, yld 18, P.H. 10.1, P.F 1.1. Survey ~ 12,179' -
3% deg.
Bit #57, HTC XlG, 10 hfs, 38', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40,000 wt, 80 rpm, T-6, B-2, o 1/8.
Bit #58, Sec S4T~ 11 hfs, 64', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 30-35,000 wt, 80 rpm.
Drilled to 12,179', made survey & trip for new bit. Strung up
10 lines. Now DA.
9-23-67 .
77 days. TD 12,333'. Siltstone & shale. Made 90' last 24 hrs.
Mud ll.l#/gal, viscosity 55, W.L. 3.2, 2/32, salt 35 gpg, sd
1~4~, sld 17, yld 11, P..H. 10, P.F 1. Survey ~ 12288' - 3~ deg.
Bit #58, Sec S4T, 18~ hrs~ 109', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 35,000 wt, 80 rpm, T-4, B-7, I.
Bit #59, HTC XlG~ 8 hrs, 45', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 35,000 wt, 85 rpm.
Drilled to 12,288', made survey & trip for new bit. Changed 2
stabilizers. Now DA.
9-24-67
78 days· TD 12,432'. Siltstone & coal. Made 99' last 24 hrs.
Mud ll.l#/gal, viscosity 55, W.L. 3.4, 2/32, salt 35 gpg, sd
1~%, sld 17~ yld 16, P.H. 10, P.F 1. Survey ~ 12,432' - 3% deg.
Bit #59, HTC XlG, 25~ hrs, 144'~ 3 12/32 jets, 62 spm, 465 gp~,
2400 pressure, 40,000 wt, 88 rpm, T-5, B-7, o 1/8.
Bit #60~ HTC XlG~ 2 hrs~ 11', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 28~000 wt, 88 rpm.
Drilled to 12,432' made survey & trip for new bit
9-25-67
79 days. TD 12,523' Sandy siltstone & shale. Made 91' last
24 hrs. Mud ll.l#/g21~ viscosity 56, W.L. 3.4, 2/32, salt 35
gpg~ sd 1~, sld 18~ yld 18~ P.Ho 10, P.F .9.
Bit #60~ HTC XlG, 19~ hrs~ 91', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40~000 wt, 80 rpm.
Finished trip for new bit. Drilled to 12,523' , made survey.
Now POH.
9-26-67
80 days. TD 12,611'. Siltstone & sand. Made 88' last 24 hrs.
Mud ll.l#/gal, viscosity 55, W.L. 3, 2/32, salt 35 gpg, sd 1~,
sld 19, yld 26, P.H. 10.5, P.F 1.3. Survey ~ 12,523' - 1 3/4
deg.~
Bit #61, HTC X1G, 17 hfs, 88', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40,000 wt, 80 rpm.
Made trip for new bit (~ 12,523'. Now DA.
9-27-67
81 days. TD 12,700'. Siltstone, sand & coal. Made 89' last
24 hrs. Mud ll.O#/gal, viscosity 54, W.L. 3.2, 2/32, 35 gpg,
sd 1~, sld 18, yld 10, P.H. 10.5, P.F .8. Survey ~ 12,633' -
2 deg.
Bit #61, HTC XlG, 20~ hfs, 109', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 40,000 wt, 65 rpm.
Drilled to 12,632', made trip for new bit & picked up boot bas-
ket. Lost all bearings in No. 1 cone & No. 2 cone locked.
Had 7' of fill. Now DA.
9-28-67
82 days. TD 12,777'. Siltstone & sand. Made 77' last 24 hrs.
Mud ll.0#/gal, viscosity 57, W.L. 3.2, 2/32, salt 50 gpg, sd
1~%, sld 18, yld 14, P.H. 10.5, P.F .7. Survey ~ 12,726' -
1 3/4 deg.
Bit #62, HTC XlG, 19 hfs, 94', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 30,000 wt, 70 rpm.
Drilled to 12,726', made survey & trip for new bit. Recovered
hand full of bearings in boot basket. Layed down boot basket.
WIH. Now DA. Had 7' of fill on bottom.
9-29-67 '
83 days. TD 12,851'. Siltstone & sand. Made 74' last 24 hrs.
Mud ll.0#/gal, viscosity 58, W.L. 3, sd 1~, sld 18, yld 10,
P.H. 11, P.F 1.0o Survey ~ 12,818' - 1~ deg.
Bit #63, Sec S4TG, 17 hrs, 92', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 30-40,000 wt, 65 rpm, T-6, B-6, o 1/8.
Bit #64, Sec S6T, 6 hfs, 33', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 35,000 wt, 65 rpm.
Drilled to 12,818t, mkde survey, POH. WIH, reamed last 20' to
bottom. Now DA.
9-30-67
84 days. TD 12,919'. Siltstone & sand. Made 68' last 24 hrs.
Mud ll.O#/gal, viscosity 51, 3.2 W.L., 2/32, salt 40 gpg, sd
1~%, sld 18, yld 11, P.H. 10.4, P.F .7. Survey ~ 12,918' - 1~
deg.
Bit #64, Sec S6TG, 22 hrs, 100', 3 12/32 jets, 62 spin, 465 gpm,
2400 pressure, 43,000 wt, 65 rpm, T-5, B-6, I.
Bit #65~ HTC XDG, ~ahr, 1'.
Made trip ~ 12,918' for new bit. Had 6' of fill. Now DA.
10-1-67
85 days. TD 13,014'. Sand & shale. Made 95' last 24 hrs.
Mud ll.O#/gal, viscosity 52, W.L. 3.2, 2/32, salt 40 gpg,
sd 1~%, sld 18, yld 13, P.H. 10.2, P.F. 1.0.
Bit #65, I~C XDG~ 21 hrs, 96', 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 35-43,000 wt, 65 rpm, T-5, B-6, I.
D~ilt'ed~to 13,014'. Made trip, just got on bottom, had 4-5'
of fill.
10-2-67
86 days. TD 13,074'. Siltstone & sand. Made 60' last 24 hrs.
Mud ll.O#/gal, viscosity 58, W.L. 2.8, 2/32, salt 40 gpg, sd
1~%, sld 18, yld 19, P.H. 10.2, P.F. 1.2.
Bit #66, HTC XDG, 19 hfs, 60', 3 12/32 jets, 62 spm, 465 9pm,
2400 pressure, 44,000 wt, 65 rpm.
Now DA.
10-3-67
87 days. TD 13,080'. Siltstone, sand & shale. Made 6' last
24 hrs. Mud ll.O#/gal, viscosity 58, W.L. 3.4, 2/32, salt 40
gpg, sd 1%%, sld 18, yld 16, P.H. 10, P.F 1.0. Survey ~
13,076' - 2~ deg.
Bit #66, HTC XDG, 20 hrs, 62t, 3 12/32 jets, 62 spm, 465 gpm,
2400 pressure, 44~000 wt, 65 rpm, T-6, B-6, I.
Bit #67, Sec M4NG~ 2% hfs, 4', 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 35,000 wt, 65 spm.
Drilled to 13,076', made 15 std short trip. Circulated out,
made survey, POH. Rigged up Schlumberger, ran IES sonic
caliper lo9. Tested BOP and choke manifold to 3000 psi, O.K.
WIH, reamed last joint down. Had 8' of fill.
10-4-67
88 days. TD 13,112' Siltstone & sand. Made 32' last 24 hrs.
Mud ll.O#/gal, viscosity 52, W.L. 3.5~ 2/32, salt 55 gpg, sd
1~, sld 18, yld 12, P.H. 10.4, P.F 1.2.
Bit #67, Sec M4NG, 16 hfs, 32', 3 ~" jets, 62 spm, 465 gpm,
1800 pressure, 35,000 wt, 65 rpm, T-2, B-2, I.
Bit #68, HTC X1G, 1% hfs, 4', 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 25,000 wt, 65 rpm.
Drilled to 13,108' made trip for new bit O.K Now DA
, · ·
10-5-67
89 days. TD 13,190'. Siltstone, sand & shale. Made 78' last
24 hrs. Mud lO.9#/gal, viscosity 52, W.L. 4, 2/32~ salt 50
gpg, sd 1%%, sld 19, yld 6~ P.H. 10.1, P.F 1.0.
Bit #68, HTC XlG, 23 hrs, 92',. 3 ~" jets, 62 spm, 465 gpm,
1800 pressure, 35,000 wt~ 65-80 rpm.
Drilled to 13,190', made survey, now POH.
10-6-67
90 days. TD 13,243'. Shale. Made 53' last 24 hrs. Mud
ll.l#/gal, viscosity 50, W.L. 3.2, 2/32, salt 55 gpg, sd
1%~, sld 17, yld 5, P.H. 9.8, P.F 1.2. Survey ~ 13,190' -
2 deg.
Bit #69, Reed ST1AG, 16% hfs, 53'~ 3 %" jets, 62 spm~ 465 gpm~
1800 pressure, 40,000 wt, 65-80 rpm.
Finished trip for new bit O.K. Had 10' of fill. Now DA.
10-7-67
91 days. TD 13,290'. Shale. Made 47' last 24 hrs. Mud
ll.O#/gal, viscosity 45~ W.L. 4.2, 2/32, salt 55 gpg, sd
1~, sld 16, yld 6, P.H. 9.8, P.F .9. Survey ~ 13,290'
2 deg.
Bit #69, Reed StlAG, 28% hfs, 101', 3 %" jets, 62 s~m,
gpm, 1800 pressure, 40,000 wt, 75 rpm, T-6, B-4, o 5.
Bit #70, HTC XDG.
Drilled to 13~290', made survey, POH. Magnafluxed all
and subs. Had cracked pin 10 DC's from top. Changed out
same. Now GIH.
10-8-67
92 days. TD 13,340'. Shale & sand. Made 50' last 24 hrs.
Mud ll.O#/gal, viscosity 57, W.L. 4.2, salt 45 gpg, sd 1~%,
sld 16, yld 10, P.H. 10.4, P.F. 1.3.
Bit #70, HTC XDG, 15 hfs, 45', 3 %" jets, 6'2 spm, 465 gpm,
1800 pressure, 40,000 wt, 75 rpm.
Bit #71, HTC OWV, 2 hfs,. 5' , 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 36,000 wt, 75 rpm.
Drilled to 13,335' made trip, now DA
, ·
10-9 -67
93 days. TD 13,379' Sand & shale. Made 39' last 24 hrs.
Mud ll.O#/gal, viscosity 50, W.L. 3.8, 2/32, salt 40 gpg,
sd 1~, sld 17, yld 7, P.H. 10.4, P.F. 1.3.
Bit. #71, HTC OWV, 19% hfs, 44', 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 40,000 wt, 75 rpm.
Drilled to 13,379'. Now POH.
10-10-67
94 days. TD 13,460'. Siltstone & sand. Made 81' last 24
hrs. Mud ll.O#/gal, viscosity 50, W.L. 4, 2/32, salt 45 gpg~
sd 1%%, sld 17, yld 8, P.H. 10, P.F 1.0.
Bit #72, Sec 4TG, 19 hrs, 81', 3 ~" jets, 62 spm, 465 gpm,
1800 pressure, 40,000 wt, 80 rpm.
10-11-67
95 days. TD 13,500'. Siltstone & sand. Made 40' last 24
hrs. Mud ll.O#/gal, viscosity 51, W.L. 3.6, 2/32, salt 45
gpg, sd 1%~, sld 18, yld 6, P.H. 10, P.F .9. Survey ~
13,463' - 2% deg.
Bit #72, Sec 4TG, 20% hfs, 84' 3 %" jets, 62 sPm, 465 gpm,
,
1800 pressure~ 40,000 wt, 80 rpm, T-3, B-3~ I.
Bit #73, Sec 4TG, 10% hfs, 37', 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 40,000 wt, 80 rpm.
Drilled to 13,463', made survey & trip for new bit. Had
tight hole from 7,000' to 5900'. While going in hole, had
to ream from 5900' to 6,030'. Had 6' bridge ~ 9900'. Had
30' of fill. Now DA.
10 -12 -67
96 days. TD 13,560'. Siltstone & sand. Made 60' last 24
hrs. Mud ll.O#/gal, viscosity 56, W.L. 4.2, 2/32, salt 50
gpg, sd 1~, sld 18, yld 11, P.H. 10, P.F .8.
Bit #73, Sec 4TG, 18 hfs, 63', 3 %" jets, 62 spin, 465 gpm,
1800 pressure, 40,000 wt, 80 rpm, T-7, B-4, I.
Bit #74, Sec 4TG, 8 hrs, 34', 3 %" jets, 62 spin, 465 gpm,
40,000 wt, 1800 pressure, 80 rpm.
Drilled to 13,526'. Made trip for new bit. WIH, spent ~ hr
cleaning out 20' of fill. Now DA.
10-13-67
97 days. TD 13,627'. Siltstone. Made 67' last 24 hrs.
Mud ll.0#/gal, viscosity 57, W.L. 3.4, 2/32, salt 60 gpg,
sd 1%, sld 18, yld 7, P.H. 9.7, P.F 1.0. Survey ~ 13~610' -
2% deg.
Bit #74~ Sec 4TG~ 20 hrs~ 84'~ 3 ~" jets, 62 spin, 465 gpm,
1800 pressure, 40,000 wt, 80 rpm, T-4,' B-3, I.
Bit #75, Sec S-3J, 3~ hrs,8017' 3 %" jets, 62 spin, 465 gpm,
1800 pressure, 35,00~ wt, r~m.
Drilled to 13,610', made survey, POH. Changed bits, WIH O.K
Had 8' of fill.
10-14 -67
98 days. TD 13,684'. Made 57' last 24 hrs. Siltstone & sand.
Mud ll.0#/gal, viscosity 58, W.L. 3.5, 2/32, salt 60 gpg, sd
1~, sld 18, yld 12~ P.H. 10, P.F. 1.2.
Bit #75, Sec, SJT, 19 hrs, 74', 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 35-40,000 wt, 80 rpm, T-3, B-4, I.
Bit #76~ Sec S4TG.
Drilled to 13,684' POH. Had tight hole from 6200' to 5100'
Finished out of hole O.K. Changed bits, WIH o.k. Had 5' of
fill.
10-15-67
99 days. TD 13,768'. Siltstone & sand. Made 84' last 24 hrs.
Mud ll.0#/gal, viscosity 56, W.L. 4, 2/32, salt 60 gpg, sd 1~,
sld 18, yld 12, P.H. 10.4~ P.F. 1.2.
Bit #76~ Sec, S4TG, 22 hrs, 84', 3 %" jets, 62 spa, 465 gpm,
1800 pressure, 40,000 wt, 80 rpm.
Drilled to 13,734'. Pulled up to 5000' O.K. Went back to
bottom. Had 8' of fill.
10-16-67
100 days. TD 13,773'. Siltstone & sand. Made 5' last 24 hrs.
Mud ll.O#/gal, viscosity 56~ W.L. 4, 2/32, salt 60 gpg, sd
1%%, sld 17, yld 30, P.H. 10.4, P.F. 1.3.
Bit #76, Sec S4TG, 24 hrs, 89'~ 3 %" jets, 62 spa, 465 gpm,
1800 pressure, 40,000 wt~ 80 rpm.
Drilled to'13~773', made survey~ pulled out of hole to 6445' &
stuck pipe. Worked pipe to maximum pull of 380,000#. Shaffer-
Wagner bumper safety joint backed off. POH, leaving top of fish
~ 5881'. Went back in hole w/SWBSJ barrel w/8 5/8" guide, Bowen
oil jars, Bowen bumper sub & 5 7" DC's. Could not get over
fish. POH, guide showed markings of being on top of fish.
WIH with 9 7/8" bit & 5 DC's. Cleaned out to top of fish.
Circulated out.
10-17-67
101 days. TD 13,773'. Zero footage last 24 hrs. Mud 11.0#/
gal, viscosity 809 W.L. 4, 2/32, salt 60 gpg, sd 1~, Survey
~ 13,773' - 3% deg.
Bit #76, Sec S4TG, 24 hrs, 89', 3 %" jets, 62 spm, 465 gpm,
1800 pressure, 40~000 wt, 80 rpm.
Bit #75, Sec S3~ rerun.
POH, layed down bit~ picked up SWBSJ barrel on bottom of bent
joint, Bowen bumper sub~ Bowen oil jars, & 5 DC's. WIH, latched
into fish~ jarred on same for 3 hrs. Spotted 60 bbl diesel ot
mixed w/2 drums pipe lax. Jarred on fish 1% hrs. Fish came
loose. Circulated out. Had to work first 8 stds out. Now
POH O.K. Layed down 14 7" DC's & 9 stabilizers. Picked up
bit #75, WIH. ~irculated & conditioned mud prior to logging.
10-18-67
102 days. TD 13,773'. Zero footage last 24 hrs. Mud 11.0#/
gal; viscosity 7Z~ W.L. 4, 2/32, salt 65 9Pg, oil 1%~ sld 18,
sd 1~ yld 28, P.H. 10.4, P.F. 1.3.
Bit #75~ Sec S3, rerun.
Circulated & conditioned mud 5 hrs. POH to 6155' & started
having tight hole. Picked up Ke!~ey~ circulated & worked out
4 singles to 6035'. Kept jarring on pipe with no luck Mixed
40 bbl diesel oil w/2 drums pipe lax. Spotted 20 bbl 2round
DC's with 12 bbl left in D.P. Pumped 1 bbl/hr. After 1 3/4
hfs, pipe started moving. Worked out to 5953'.
10-19-67
103 days. TD 13,773'. Zero footage last 24 hrs. Mud 11.0#/
gal~ viscosity 65~ W.L. 4~ 2/32~ salt 65 gpg~ oil 1%~ sd 1~
sld 18, yld 28~ P.H. 10.4~ P.F. 1.3.
Bit #75~ Sec S3, rerun.
Displaced 1 bbl diesel mixed with pipe lax around bit every hr
until 7:30 a.m. Kept jarring on fish until 9:30 a.m. Attempted
to get loose from SWBSJ & backed off tool joint on top of same.
POH~ picked up 5 DC's~ oil jars, & bumper sub. WIH, could not
find top of fish. POH~ went back in hole w/bit, 2 DC's, oil
jars. Could not find top of fish. WIH & reamed ~o 20' below
bottom of fish ~ 5893'. Did not touch anything. Went in hole
to 13~683'~ 190' below where top of fish would have been if on
bottom. Reamed from 13~650' to 13~683'. Now POH.
10-20-67
104 days. TD 13,773'. Zero footage last 24 hrs. Mud 10.8#/
gal, viscosity 53, W.L. 3.2, 2/32, salt 60 gpg, sd 3/4%, sld
15~ yld 10~ P.H. 10, P.F .7.
POH, came by fish O.K. Spent 8 hrs working pipe from 5559' to
5409'. Finished out of hole, rigged up Schlumberger & attempted
to run electrical logs WIH to 5614' could not go any deeper
' 9
Put 6~" centralizer on bottom of sond. WIH, stopped ~ 5614'.
Unlatched SWBSJ top & POH. Rigged up Schlumberger, ran IES log
to 5616', stopped POH. Showed we were sitting down on top of
safety joint. Built up OD of centralizer to 8" w/tape. WIH
O.K. Now tying in 12,950'.
10-21-67
105 days. TD 13~773'. Ran IES log to 13~640', sonic to
dipmeter to 13~472'. Ran core gun & got 11 cores. Rigged down
Schlumberger. WIH to 5500'. Pumped mud,around, spotted 120
sx Cement plug w/2% CaC1 w/bottom ~ 5500 Mixing & pumping
time: 20 min. POH, now laying down DP.
.10-22-67
106 days. TD 13,773'. Checked cement plug ~ 5420'. WIH to
3000'. Mixed 120 sx cement w/2% CaC1. Mixing & pumping time:
20 min. Job complete ~ 8:30 a.m. Layed down DP. Installed
jet in sump pit. Picked up bit, WIH to test cement plug ~ .
2858'. After 10 hfs was good & firm. POH~ picked up Halli~
burton 10 3/4" bridge plug, WIH & set same ~ 1809'. Now
pumping mud & water into formation at rate of 8 bbl/min.
10-23-67
107 days. TD 13,773t. Pumping water out of sump pit into hole
through bridge plug set ~ 1809'. Removing windwall & pum~ 'Shed..
·
10-24-67
108 days. TD 13~773'. Finished pumping water out of sump,lpit
into hole. Squeezed ~20 sx cement piug ~ 1809'. Mixing &
pumping time. 25 min. Job complete ~ 9.45 a.m.
Let cement set 8 hrs & checked w/1000 psi. Held O.K. ?OH,
laying down DP. Layed down all DP in derrick & Kelley swivel.
Removed BOP & cut off well head. Set 20 sx surface plug &
installed marker. Well plugged & abandoned.
rOPY
P. O. BOX 214676 3325 LONGVIEW DRIVE SACRAMENTO, CALIFORNIA 95821 U.S.A.
PHONE 482-4950
CABLE ADDRE~, EXLOGG SACRAMENTO. CAL'IFORNIA
November 2, 1967
The final log distribution on the Superior Oil Company "Thr~ee Mile Creek_
State" No. 1 in Section 3, T12N-RllW of the Tyonek Area~Alas~a i~--~s
1 Blue
2 Rev. Brown
Original
1 Blue
1 Blue
1 Blue
1 Rev. Brown
1 Blue
1 Rev. Brown
1 Rev. Brown
1 Blue
1 Rev. Brown
The Superior 0il Company
3301 Brundage Lane
Bakersfield, California
Attention: B. G. Winters
The Superior Oil Company
P. O. Box 1521
Houston, Texas
Attention: Mr. N. W. Engel
The Superior Oil Company
P. O. Box 1521
Houston, Texas
Attention: Mr. H. L. Franques
Acasa Investment Company
900 Wilshire Blvd.
Los Angeles, California
Attention: Mr. H. Hoover Jr.
Bristol Bay Oil Company
815 6th Street, S. W.
Calgary, Alberta, Canada
Attention: Mr. R. E. Mater
Champiin PetrOleum Company
P. O. Box 9365
Fort Worth, Texas 76107
Attention: Mr. M. B. Hansen
Continental Oil Company
425 G Street
Room 620
Anchorage, Alaska
Attention: Mr. J. R. Hultman
Final Log Distrib~'t-i~on
Superior Oil Company
"Three Mile Creek State" No. 1
November 2, 1967
Page 2
1 Blue
1 Re~z. Brown
1 Blue
1 Rev. Brown
5 Rev. Brown
3 Blue
1 Rev. Brown
1 Blue
1 Rev. Brown
3 Blue
I Rev. Brown
Gulf Oil Corporation
P. O. Box 1392
Bakersfield, California
Attention: Mr. J. C. Benzley
Mr. Harry Kilian
2130 Chamber of Commerce Bldg.
Houston, Texas 77002
Pan American Petroleum Corporation
P. O. Box 779
Anchorage, Alaska
Attention: Mr. J, M. McK~ve~
Union Oil Company
2805 Denali Street
Anchorage, Alaska
Attention: Mr. Don Reynolds
State of Alaska
Dept. of Natural Resources
Division of Mines & Minerals
3001 Porcupine Drive
Anchorage, Alaska
Standard Oil Company
3001 C Street
Anchorage, Alaska
Attention: Mr. A, B. Scouler
EXPLORATION LOGGING INC.
Form No.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
Effective: July 1, 1964
LAND DFFIDE
LEASE NUME~ER
LEASE OR UNIT NAME
Oct
Oct
Oct
Oct
Oct
Oct
LESSEE'S MONTHLY REPORT OF OPERATIONS
State ___A__I___~_s_k__~ ................ i ......... Borough ............................................. Field ___.W__J:!__d___c.-a".~__
Tl~e followi~,~ is a eorreo~ repot* of opera,ions arid prod~e*ior~ (i~etz, dir~ drillir~ a~d produeir~
wells) for ~l~e rnor~tl~ of ____O_~_~oh~_ ....................... 19_0_7_ .............................................................................
aa ess ............... Co,,pa
........................... _425___a__S-tz e_eX_anc ho_ :a_ e ............. ....
£~or~ ................ _2___7___7_.-__9___5__9__$_ ............................................... ,~*,** ~ ~it~e _S___r__:___p_r__J,__l__l_!n_g_.___E_.n_~.___._ ...........
,.
Cu. F~. o~ GAS GALtONS O~ BARRE~S o~' REMARKS
SEC. AND ~WP. RANGE WELL DA~S. BARRE~ OF O~ ORA~TY ~AS0~E WATER (~ (If ~g. depth; If shut d~n,
~ OF ~ NO. Pao~o=~ (~'thous~) RECOV~R~ none, so s~te) ds~ ~d r~t o~ ~t for ~o~e
. oon~t of g~)
1 tk;u Oct '~6 O~il:.in9 fzom 12, )19 to 13,773. ~ud ll.0~/gal, viscos~
41, ~.L. 3.2. Sm:veys: 1:3,076~ - 2~.~, 13,190~ -2;
2; 1:~,463~ - 2~; '[3,610~ 2~.
e
1~ TD 1:~,773*. Mud [1.0~/9a1', viscosmty 41,
~H )ipe stuck 2 ~445'. Spotted 60 bbl of diesel oil
~xe. t w/pipe lax. Pipe ca me loose.
.
18 ~D 1:~,773', ~ud '[1.0~/gal, viscosity 72, W.L. 4.0.
Ci~c~lated ard col~ditioned mud. POH to 6155'. Starte(
.
havi~9 tight ihole Pipe stuck ~ 6035' . Spotted diesel
. but ]~ipe would no~; come loose.
19 ' ~D 1:~,773'. Back~d offff ffish ~ 5514', leavin9 9 DC'
B st~bilize~s in ~;he hole. POH. WIH to tie into ffish
coul,~ not ffizd to]) off ffish. ~H.
20-2[. gIH ~ ffbit to 13,6. ~3 ~ , POE. ~i99ed up S chlumberge~
I~, Sonic, dipme :e~ and s ample ~un. Fi nished w/Schlu~
9pot':ed plu9 ~1, -20 sx cement with top 2 5420'.
22-2,~ ~pot :ed plu9 ~2, '~.20 sx cezent with ~op ~ 2858
Vu~t,m bridge plu.~ 1809' and pumped mud ff~om sump p~t
' tank:~ into ffcrmat:[on. Squeezed 220 sx cfi cement w/2~
Let ;et 8 ~s. T. ~sted to 1000 psi, O.K. Set 20 sx
)lug welded ~rk,~r ~ surface.
Mell plugged &' abltndoned 10-24-67
:.~
ty
290 ' -
While
but
oil
,n
umber get.
Halli-
and
CaCt.
lce
NOTE.--There were ................................................ runs or sales of oil; ................................................ M cu. ft. o~s sold;
............................... ' .............................runs or sales of gasoline during the month. (Write "no" where applicable.) ~f
NOTE.~Report on this form is required for each calendar month, regardless of the status of operations,"a~.id
be filed in duplicate with the Division of Mines & Minerals by the 6th of the succeeding month, unless ot'hervZ/~e
directed.
THE SUPERIOR OIL COMPANY
425 G STR£E-'T
6rln FIRST NATIONAL BUILDING
ANCHORAGE, ALASKA c~5rl1
October 31, 1967
Bit. Thomas R. Marshall, Jr.
Department o£ Natural Resources
Division o£ Mines & Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Re: The Superior Oil Company
Three Mile Creek State #1
Permit No. 67-20
Lease No. ADL 03264
Dear Mr. Marshall,
Attached is the monthly report of operations for the month
of October, 1967.
ELM/brc
Very truly yours,
THE SUPERIOR OIL COMPANY
RECEIVED
~0V 8 .tg87
AMERICAN STRATIGRAPHIC
P.O. BOX 2127 · ANCHORAGE, ALASKA ·
TRANSMITTAL
COMPANY
October 31, 1967
Tom Marshall
State of Alaska
Division of Mines 'And Minerals
Anchorage, Alaska
Dear Sir:
We have transmitted this date via personal delivery ( 9 boxes)
washed ........ samples from the:
Mobil Tower No. 2!
1180- 11740
Superior Three Mile Creek
-- 30" -i~/'/.tO"
Please acknowledge receipt by returning one copy of f. his transmittal.
Very truly yours,
Receipt acknowledged
_ /0 '- 3/~-~ ~ date
Remarks:
THE SUPERIOR OIL cOMPANY
425 n'. C=Ti~£E:T
~nO F'IRBT NATIONAL BUILDING
ANCHORAGE, ALASKA 99501
October 27, 1967
Mr. Thomas R. Marshall
Department of Natural Resources
Division of Mines & Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Re:
The Superior Oil Company
ek State #1
Lease No. ADL 03264
Dear Mr. Marshall,
Attached is the sundry notice of the abandonment of subject
well.
ELM/brc
Very truly yours,
THE SUPERIOR OIL COMPANY
E. L. Moses, Jr.
RECEIVED
OCT 3 0 1967
DIVI~iION OF MINES & NUNERAIJI
ANCHOP~GE
Form P--3
STA?' ~: ALASKA SUBWZT IN TRIP]M
(Other instructions re-
OIL AND GAS CONSERVATION COMMITTEE verse side)
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a different reservoir.
Use '°APPLICATION FOR PERMIT--" for such proposals.)
Effective: July 1, 1964
ADL 03264
6. IF INDIAN' ALLOTTEE OR TRIBE NAME
1. 7. UNIT AGREEMENT NAME
0IL [] GAS [X~ OTHER Wildcat
WELL WELL
NAME OF OPERATOR
The Superior Oil Company
ADDRESS OF OPERATOR
600 1st National Bldg 425 G St., Anchorage
4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.*
See also space 17 below.)
At surfece
Center NW/4, Sec 3, T12N, RllW, S.M.
14. PERMIT NO.
67-20
15. E~.=VATIONS (Show whether OF, RT, OB, et~.)
325' Gr,
8. FARM OR LEABE NAME
State Of Alaska
9. w~. NOThree Mile Creek
St. #1
10. FIE~D AND P00L~ OR WILDCAT
Wildcat
11. EEC,, T., R., M., OR BLK. ANi~
EURVEY OR AREA
NW/4, Sec 3, T12N,
Seward Meridian
12. BOROUGH I 18. STATE
Alaska
RllW
16.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
(Other)
~IUBSEQUENT REFOR~ OF
FRACTURE TREATMENT ALTERING
SHOOTING on ACZDIZZNO ASANDONM~NT,
(Other)
NOT~: Report results of multiple completion on
ompletion or Recompletion Report and Lo~ form.)
lT. DESCRIBE PROPOSED OR CO~IPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work. If well is direotionally drilled, give subsurface locations and measured and true vertical depths for all markers and zones perti-
nent to this work.) *
Well was dry hole. TD 13,773'. Mud in hole ll.O#/gal.
Casing:
16" 75# J-55 T&C, set ~ 205'
Conductor, , .
surface with 390 sx.
Surface~ 10 3/4", 40.50#, J-55 seal lock.
Cemented to surface with 1670 sx.
Cemented to
set ~ 2003'.
Plugs:
No. 1, 120 sx, top ~ 5420'.
No. 2, 120 sx, top ~ 2858'. ~
No. 3, bridge plug ~ 1809' with 220 sx cement. Squeezed
through plug. BOttom of cement ~ 2200'. TeSted to lO00k
psi, O.K.
No. 4, surface, 20 sx cement.
Well plugged and abandoned October 24, 1967.
18.SIGNED~I hereby certify correct
· ITLE Sr. Drillin~ Engr.
DA~E 10--28--67
(This space for Federal or State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
*See Inmuction, on Reverse Side
DATE
RECEIVFO
0c] 3n 1961
DI¥1$1ON OF MINE~ & MINIIRAI~
THE SUPERIOR OIL COMPANY
4~5 13 f=TE£ET
6nn FliP,iT NATIDNAL BUILDING
ANCHORAGE:, ALASKA 99501
October 11, 1967
Mr. Thomas R. Marshall, Jr.
Department of Natural Resources
Division of Mines & Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Re: The Superior Oil Company
Three Mile Creek State #1
Permit No. 67-20
Lease No. ADL 03264
Dear Mr. Marshall,
Attached is the monthly report of operations for the month
September, 1967.
Very truly yours,
THE SUPERIOR OIL COMPANY
ELM/brc
1 Attach
E, L. Moses, Jr.
RECEIVED
OCT 1 ~ 19~7
DI¥t~ION OF MINES & MINBtAI.I
Form No.
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
Effective: July 1, 1964
LANo ~rr,~ Anchorage
LEA~ ~UM~E~ ADL 03264
-~^~ OR .N,~ ~ Three Mile
Creek S~.
LESSEE'S MONTHLY REPORT OF OPERATIONS
Sept 4
Sept
State __A_!__.a___s_k_.~ ................ i ......... Borouph .............................................. Field ____W_.i!__d___C_a..~ ..........................................................
Tl~e f°llowi~ff is a eorreot repor~ of operatior~s arid prod~e~ior~ (i~eh~dir~ drillir~ff and prod~ei~ff
wells) for tke mo~t~ of ___~'.~.~_~ ................... 19_.~7 .............................................................................
.......... ..............
........................... ~_~___~___P~_;t __ ~ ~ P°Zage ~ Si~ne~ .... ~~~ ............ ~ .......
Pko~e .... ~-~5~ ' .' - ............. ~ ......... : .......... ~e~t s t~tle ~_~m__.~_~_~_~g_._~.~g~_m_ ...........
SEC.. AND D*-s. BARRELS OF OIL GRAVr~¥ Or. FT. O~ O~S OX~NS O~ BXRRg~ O~ REMARKS
~ OF ~ TWP. RANGE WE~ GASO~E WATER (~ (If ~g, d~th: If ~hut d~n, oa~;
No. PRO~O,D (~' thomaS) RECOVERXD none, so state) ~ ~d r~ult of
N 11~ 1
Sept ~ TD ~0,~,85'. M~d ll.O~/~al~ viscosit'~ 50 W'.L. 3.8
FinJ.shed cir..ula~ing~ ~ 10,680:~ ~OH. WIH w/Tri-State junk
base,et ~ ~H~ Di([ not rec,)ver ca [iper.
Righted up Sc hlum~erger un,it. Ra:~ sonic caliper format'on
dens~i'ty log ~. CD~I.
Sept 2 &- 3 .TD lO~lO'. M~d ll.O~/~al~ viscosit~ 50~ W.L. 3.8.
~. Ran Schlumbe:~ger core gun. WIH ~ drill.~d to 10~710' ~ made
tri~ for new bit. .Starte'l to ~11 & c~liper fell in and
~ pip~ stuck.. Wor~:ed pipe ~o maxi:~um pul'.[ of 380,000 lb
pip~ came free. POH~ picked up )it & b.)ot basket~ WIH
driP.led on j~ ].% hrs~ P)H. Re. 2overed 10% lbs of jun
WIH with Bow~n r~verse ci'culati:~9 junk retriever ~ cut 1'
'cor~ . ~H~ ~o r~covery.
- 18 Dri]-ling fro, 10~710' to' [1~g93'. Mud [1.O#/gal~ viscosity
41~ W.L. 3.2.
Ran Schlumbe:ger CDM. IES, & tool( 21 si lewall samples.
Sur,'eys ~ 10~750 -3 deg~ 11~O0~)' - 3 ~eg; 11,381' -
3 d~g; 11~695' - 3 deg; 1~885' - 3 deg.
19-30 Drilling fro, 11 993' to ~2,919'. Mud [1.O~/gal~ visc ' y
51~ W.L. 3.2.
Sur%,eyS ~ '11,993 - 3 deg; 12~14~[' - 3 ieg; 12~432' - 3% deg~
12,f;23' - 1 ~/4 (.eg; 12,726' - 1 3/4 de); 12,918' - 1~ deg.
,.
NOTE.~There were ................................................ runs or sales of oil' . ............................................... M cu. ft. as'~s~id;
............................................................ runs or sales of gasoline during the month. (Write "no" where applicable.~ :'t
NOT~. Beport on this form is required for each calendar month, regardless of the status of operahons,~nd ,~ust
be filed in duplicate with the Division of Mines & Minerals by the ~th of the succeeding month, unless (~the'~ise
directed. ~
THE SUPERIOR OIL COMPANY
42.5 G STREET
6OI3 FIRST NATIONAL BUILDING
ANCHORABE, ALASKA 99501
September 19, 1967
Mr. Thomas R. Marshall, Jr.
Department of Natural Resources
Division of Mines & Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Re: The Superior Oil Company
Three Mile Creek State #1
Dear Mr. Marshall,
Please find enclosed the sundry notice of our change in plans.
The subject well will continue to be drilled from our permit
depth of 12,000t to 14,000'.
Very truly yours,
THE SUPERIOR OIL COMPANY
ELM/brc
1 Incl
E. L. Moses, Jr.
RECEIVED
SEP 21 1967
DIVISION OF MINES & MINERAL,S
ANCHORAGE
Form P--3
STA F ALASKA SUBMIT IN TRIP: ~TE*
(Other instructions ,.~ re-
OIL AND GAS CONSERVATION COMMITTEE verse side)
Effective: July 1, 1964
ADL, 03264
6. IF INDIAN, ALLOTTEE OR TRIBE NAME
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a different reservoir.
Use "APPLICATION FOR PERMIT--" for such proposals.)
1. 7. UNXT AOaEE~tENT NAME
0ILWELL [] WELL OAS [] OTHER Wildcat
2. NAME OF OPERATOR 8. FARM OR LEASE NAME
· he Superior Oil Company State of Alaska
8. ADDRESS OF OPERATOR 9. W~L NO. Three
Mile
600 1st Nail Bldgs 425 G St. s Anchorage Creek State #1
4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements.*
See also space 17 below.)
At surfeCe
Center NW/4, Sec 3, T12N, RllW
15. E~VArIONS (Show whether DF, Rr, OR, ~)
325' Pr,
14. PERMIT NO.
67-20
10. FIELD AND POOL, OR WILDCAT
Wildcat
11. SEC., T., S., M., OR BLIE. AND
SURVEY OR ABRA
NW/4, Sec 3, T12N,
Seward Mer idi&n
12. BOROUGH [ 18. STA~E
I
' IAlaska
16.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDONS
CHANGE PLANS
(Other)
EUBSEQUENT REPOR~ OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACXDIZINO ABANDONMENTs
(Other)
NOTE: Report results of multiple completion on Well
ompletion or Recompletion Report and Log form.)
RllW
17. DESCRIBE I'ROPOSEO OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an)'
proposed work. If well is dir%tionally drilled, give subsurface lo~ations and measured and true vertical depths for .all markers and zones perti-
nent ~o this work.) *
Permit was issued for 12,000,. Test plans have now been
changed to drill to 14~000'. The well is presently drilling
~ 12~000' and will continue to drill to 14~000'.
18' I hereby ~h~tuLtsffr_u~_.~e°rreet
(This space for Federal or S~te office use)
APPROVED BY~
CONDITIONS OF APPROVAL, ~ A~:
TITLE Sr, Petroleum Engr. GATE 9-19-67
TITLE
*See Instructions on Reverse Side
RECEIVED
SEP 21 1967
DIVISION OF MINES & MINERALS
ANCP. ORAC~E
THE SUPERIOR OIL COMPANY
425 r'.J STREET
6013 FIRST NATIONAL BUILDING
ANCHIiIRABE, ALAEiKA ~J~JSEI1
September 5, 1967
Mr. Thomas R. Mar shall, Jr.
Department of Natural Resources
Division of Mines & Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Re: The Superior Oil Company
Three Mile Creek State #1
Permit No. 67-20
Lease No. ADL 03264
Dear Mr. Marshall,
Attached is the monthly report of operations for the month
of August~ 1967.
Very truly yours,
THE SUPERIOR OIL COMPANY
ELM/brc
1 Attach
E. L. Moses, Jr.
RECEIVED
SEP ~,1367
DI¥1$10N OF MINES & MINEiJA~
AN(~-I~RAGE
Form No. P--4
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
Effective: July 1, 1964
~rr,=~ Anchorage
.oMs~ADL 03264
o.....~ .AM~ Three Mile
Creek St. #1
LESSEE'S MONTHLY REPORT OF OPERATIONS
State .... __A__l~_S_k_ a ...................... Borough .............................................. Field ___~_~d___c..a._~ .........................................................
TI~e followin~ is ~ oorreo~ repor~ of opera~ions a~d procl~e~io~ (inel~di~ drilli;%~ and prod{z~in~
walls) for ~;~e mont;~ of ____A__u_~t.u__~_$ .......................... 19._6._7, _ ...........................................................................
· /1~er~t~saddress~6-~--~s~-~N~a~-~-~a~B~d~ ....... ~-'- C°mPa'~---~-h--e---'-S'~-Re"r'--%-'°"r'"-'O"i--l--'--C"o-'-m'p-a'-n-"Y
425 O · S~Cre_~_ ............................... ~i~r~ed J ...... ___'J~~____'_~.___,fT~ ...... ~ .......
'~'-o-~--e ....... -~-f:-O-~-~ ........ ~ ..... iiii.iii__iii_._J_ .... ' .......... ~ .......... .4~e~t,s~itleSr, ~.n_~_._~__n_g_%neer- '--' ' '
Cu. FT. O~' GAS { GAIJSONS O1~
SEC. AND BABRgI~ OF O~ I OASO~E
~ oF ~ (~'tho~&) RECOVERED
NW/4
August g 6269' to 8067 *
wi 12 ~ visco~;ity 42
: ' -13~
' -13,
· -2;
Aug I0 tstone
· Ran
ra log
Aug 11
g 8276 *
wt 1' , visco~
~84~ - 28t -
10,4 2 3/4;
Schl~ IES
cal: hole
condit mud ~
BARRELS OF
WA~ER (~
nono, so state)
Sand
Water
'4; 612; ' - 1%
'4; .677': * - 2;
'270' - 2%; 761
coal. Mud w~
logs: IFS, Im
contix ~uous dj
, 10,68, ~- Si]
;ity 42. Surv~
9649' - 2%;
0,685* - 3.
og & scenic ca
Went J n hole
Went ir hole
O, 680·
REMARKS
(If drilling, del~th; if shut, down, oause;
d~te and reeult of feet for ~aeolfme
oontent of ~a~)
siltstone, & coal.
loss 4.2
6330' - 1 3/4;
6890' - i 3/4;
.2' - 2%; 8067' - 2~.
ll#/gal, viscosity
.tegrated sonic,
.preener.
Sstone & coal.
~¥s: 8668' - 2;
996~ - 3; 10,204'
~iper.
w/over shot. Did
r/bit. Circulating
NOTE.--There were ................................................ runs or sales of oil' . ............................................... M cu. ft. of gas sold; runs or sales o£ gasoline during the month. (Write "no" where applicable.)
iNOTE.--Report on this form is required for each calendar month, regardless of the status of operations, and must
directed.be filed in duplicate with the Division of Mines& Minerals by the 6th of the succeeding month,~.~s~o~e{V.]..: ,, .' '' 'e,'. ,E D
DI¥I$ION OF MINES & .MINERAL3
THE SUPERIOR OIL COMPANY
4~-5 G STREET
600 FIRST NATIONAL BUILDING
ANCHORAGE, ALASKA 9cj501
Drilling & Completion Summary
THREE MILE CREEK STATE #1
WILDCAT
TYONEK AREA, ALASKA
Location: NW/4, Section 3, T12N, RllW
Lease No. ADL 03264
Drilled by Reading & Bates
Total Depth 13,773'
Completion Plugged & Abandoned
ELM/brc
Sr. Drilling Engineer
THE SUPERIOR OIL 'COMPANY
~2~ ~ ~T~EKT
61:)1:) t'IEST NATIONAL BUILDING
ANi3HrlRABE, ALABKA 99501
AU6 - 1. 1967
Acasa. Investment company
900 Wilshire Boulevard
Los Angeles, California 90017
Attn: Mr. Herbert Hoover, Jr.
'Gulf Oil Corporation
P. O. Box 1392
Bakersfield, California
Attn: Mr. J. C. Benzley
Bristol Bay Oil Company
815 Sixth Street, SW
Calgary', Alberta, Canada
Attn: Mr. R. E. Maret
The Hanna Mining Company
100 Erieview Plaza
Cleveland, Ohio 4414
Attn: Mr. F. M. Chace
Mr. Harry Kilian
2130 Chamber of
Commerce Building
Houston,.Texas 77002
Champlin. Petroleum Company
P. O. Box 9365
Fort Worth, Texas 76107
Attn: Mr. J. Hendrickson
Continental Oil Company
425 G Street Room 620
Anchorage, Alaska
Attn: Mr. John R. Hultman
Pan American Petroleum Corp
P. O. Box 779
.Anchorage, Alaska
Attn: Mr. John H. McKeever, Jr.
Standard Oil Company
3001 "C" Street
Anchorage, Alaska .
Attn: Mr. A. B. Scouler
·
State of Alaska /
Department of Natural Resources
Division of Mines & Minerals
3001 Porcupine Dr,, Anchorage
Union Oil Company
2805 Denali Street
Anchorage, Alaska
Attn: Mr. D. W. Reynolds
Re: Three Mile Creek State #1
Tyonek Area, Alaska
Gentlemen:
EncloSed is ~he monthly report submitted to the State of Alaska.
ELM/brc
Very' truly yours,
THE SUPERIOR OIL COMPANY
E. L. Moses, Jr.
.
RECEIVED
AUG 2,1967
DIVISION OF MINES &' MtNEP, A~
ANCHORAGE
Form No. P--4
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
Effective: July 1, 1964
o~,..~ AnchorageN,,MsE. ADL 03264
~. ~,~ ~. T~ee Mile Cree
State ~1
LESSEE'S MONTHLY REPORT OF OPERATIONS
State .... Alaska ...................... BorOugh .............................................. Field - ........ l~/~l.d.ca_t ....................................................
T]~e f°llowinff is a correct report of operations and production (includin~ drillin~ and producinff
wells) for tt~e r~ontk of ___:~__'~_~_~. .......................... 19__0_~. .............................................................................
'./l~ent's address ..... _6__O__O_____],_s__~___N___~__~__'_l__Q-n--a--.1.___~'_],_d__g ........... Corr~nan, The S._u/~_erior Oil Compa._ny
PI, one .... .2__7._7_.r_.9___5__9___3_ ............................................................ ¢l ger~t"s ~i,le __.$_r__,_P__r._i__l__!i__.n~_$_.n. str_.., .........
SEc. AND. D**a CU. FT. OF GAS GALLONS OF BARRELS OF RE]~IARKS
~ OF ~ TWP. RANGE WELL BARRELS OF OIL GRAVITY GASOLINE WATER (If (If drffiln~, d~th; 1! shut down, oause;
No. I~O~O~D (In'thousands) ds~ and result of test for ga~ol~m
· RECOVERED none, so state) oon~t of
~/4 SeC3 12N llh 1' Drilling Contractor: Readin~.l & Bat{:s Rig #7
/
7-8-67 Spudded ~.n ~ 8:00 a'.m, Drill ed to ;;05'. 15" hole.
7-9-67 Opened he)lc t:o 20".
7-10-67' '' Ran 5 jo:.nts of 16" OI 75# J..55 T&C casing to TD o:
205'. C{:men~ ed on bo~ tom wi~:h 390 ,,;x Class A cement
treated ~rith 2% calcit~ chlox'ide. ~rob completed
,
7:20
7-11-67 ff.U' 16'" hydril teste¢[ to 12(~0 psi. Drilled out 16"
shoe ~ 8 30 F.m.
7-14-67 2003" 9 '/8" hole Mud wt 9.St:/gal 8 cc ~water lost.
Surveys: (1) 370' - :i/4 deg (2) 42; ' - 1/2 deg
' (3) 511' - 1 ~eg (4) ¢,06' - ] deg (:) 680' - 1 deg
(6) 798' 3/4 deg (72 922' ~ 1/4 d,,g (8) 1047t -
3/4 deg ~9) 1217~ - 1/'2 deg {10) 13~,.4' - 1/4 deg
(ll) I49(' - [/4 deg ~12) 16;~0' -1,'4 deg (13) 174!
0-deg (1,) lSSS' -1/: deg (:.$) 200:. ' -1/2 deg.
- Ran Schl~anberger logs IES, Densit], caliper, soni~
dip mete~
7-16 67 rD :;003' FiniShed opening 9 7/f" hole to 15", Ran 49 joints
of 10 3/~,~" OD 40.50# ~-55 sci.1 lock casing to TD
2003'. (;emented casir~g with 1550 s:: of Class A wi':h
last 150 sx treated wi.th 2~ ¢alcium chloride. Job
complete([ ~ 5:45 p.m. - had ~o fetus'ns on cement.
approxim~tely 75 bbl c,£ mud.
Let set ;; 3/4 hr. Rare. 200' (,f 2" t~.bing down 16"
~0 3/4" ~nnulus and c~mented with 1;~0 sx of class
cement ts'eared with 2~ calci%m chlox'ide. Job
,! _
Lost
NOTE.~There were ................................................ runs or sales of oil; ................................................ M cu. ft. of gas sold;
............................................................ runs or sales of gasoline during the month. (Write "no" where applicable.)
NOTE.~Report on this form is required for each calendar month, regardless of the status of operations, and must
be filed in duplicate with the Division of Mines & Minerals by the 6th of the succeeding
directed.
KC~. E I VI~ IJ
2 1967
DIVISION OF MINES & MINERALS
THE SUPERIOR OIL COMPANY
600 FIRST NATIONAL BUILDING
425 G. STREET
ANCHORAGE, ALASKA 99501
Mr. Thomas R. Marshall, Jr.
Department of Natural Resources
Division of Mines and Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
June ~26, 1967
Re: Three Mile Creek State No. 1
Tyonek Area, Alaska
Dear Mr. Marshall:
Pleased find enclosed the surveyor's certified plat of the
location of subject well.
Very truly yours,
The Superior Oil Company
E. L. Moses, Jr.
THE SUPERIOR OIL COMPANY
600 FIRST NATIONAL BUILDING
425 G. STREET
ANCHORAGE, ALASKA 99503.
Mr. Thomas R. Marshall~ Jr.
Department of Natural Resources
Division of Mines and Minerals
Fetroleum Branch
3001 Pot cupine Dr ire
Anchorage ~ Alaska
June 26, 1967
Re: Three Mile Creek State No. 1
Tyonek Area, Alaska
Dear Mr. Marshall:
This letter is to inform you that an office has been opened
for the duration of .the well. The address and telephone are as
follows:
The Superior Oil Company
600 First National Building
425 G Street
Anchorage, Alaska 99501
Telephone: 277-9593
Ail correspondence concerning the well should be addressed to
the undersigned.
Very truly yours,
The Superior Oil Company
T
I$
N
T
12
N
$$
:54
$5
$6
4
9
Superior
1520
1- Three M//e Creel~ State
I0
2
THREE MILE CREEKSTATE NO. I
TYON E K AREA,ALASKA
PRELIMINARY PLAT
11Scale 2000'
THE SUPERIOR OIL COMPANY
4
9
1421.74
I0
CERTIFICATE OF SURVEYOR
I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED
AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE
OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION
SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND
THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT.
.
DATE SURVEYOR
/~--PRELIMINARY IWELL LOCATION
AS STAKEDi
T
1
TI2N
3
I0
I" = IOOO'
LOCATION SURVEY FOR
THREE MILE CREEK STATE NO.I
PRELIMINARY WELL LOCATION
LOCATED IN NW I/4 PROTRACTED SEC.:St TI2Nt RIIWt S.M.
SURVEYED FOR
THE SUPERIOR OIL COMPANY
P.O. BOX 1521 HOUSTON~ TEXAS
SURVEYED BY
HEWITT V. LOUNSBURY 8~ ASSOCIATES
ANCHORAGEt ALASKA
Mr. g. L. Bomem, Jr.
amustom, 'Zmzim 71001
Tdree mb Creek Se~o ~I
b hperfor Otl Co., Oper~
'Dea~ Sirs
Please ~ tilts offrf~e wban Tour ~urfaee efdfng bas, beeu
mR in the mmmt ~m ,~h t~ maim a uell inspection at that tm.
FORM SA - I B ~
50M 1/67 ~
M-EMO~RANDU~M
TO: J'--
FROM:
state of Alaska
DATE :
SUBJECT:
FORM SA - I B
50M 1/67 ~"~ ~
MEMORANDUM
FROM:
State of Alaska
DATE :
SUBJECT:
DEPARTMENT OF FISH AND GAME
DIVISION OF C(~ERClAL FISHERIES
1018 INTERNATIONAl AIRPORT ROAD
ANCHORAGE 99502
l~ay 12, 1967
Mr. Tom Marshall, Petroleum Supervisor
Division of Mines and Minerals
3001 Porcupine Drive
Anchorage, Alaska
Dear Mr. 'Marsha 11:
This is in reference to your memorandum dated May 8, 1967 which refers to:
Three Mile Creek'q~ate No. 1, The Superior Oil Co., Operator.
The Department of Fish and Game requests that the following wildlife stipulations
be incorporated in the permit to drill:
(1) Prior to drilling the operator must construct a sump ,of
sufficient size to contain all waste well fluids.
(2) Prior to drilling the operator must construct a low ring
dike to contain spills tb~at may occure.
(3) Upon completion or abandonment of the well, the sump must
be cleaned and filled and the general contour of the disturbed
area restored.
Yours truly,
Alaska Department of Fish and Game
Paul A. LeRoux /
Water Projects Biologist
PAL:id
cc: Huizer
Meacham
Crozton
Stefanich
Rearden
REC .IVED
NORTH TO THE FUTURE IN 1967!
FORM SA-lB ~ ,-~
50M 1/67 ~ -
MEMORAN'DUM
'TO: r-'
FROM:
State of Alaska
DATE
SUBJECT:
THE SUPERIOR OIL COMPANY
P. O. t~OX I521
HOUSTON, TEXAS 77001
April 28, 1967
Mr. Thomas R. Marshall, Jr.
Department of Natural Resources
Division of Mines and Minerals
Petroleum Branch
3001 Porcupine Drive
Anchorage, Alaska
Dear Mr. Marshall:
With reference to our conversation of April 24,
1967, I am enclosing the application for permit to drill
and a preliminary plat of the approximate location.
Weather permitting Hewitt V. Lounsbury and
Assoiciate will survey the location in the next three or
four weeks and I will forward to you the Surveyor's plat
showing the exact locations.
Very truly yours,
THE SUPERIOR OIL COMPANY
E. L. Moses, Jr.
ELM: ir
Enc.
RECEIVI D
I,IAY 3.1961
DIVISION OF MINES & MINI::RAL~
ANCHORAGE
Fb~m P i
'* ' reverse side)
APPLIEA ION FOR PERME.- O DRILL, DEEPEN; OR -PLUG BA
-?L APT 50-283-2000/*
SUBMIT IH TPJ
. E££ect[ve: July 1. 1964
DRILL*I~I; ..... ~, .. ...... :: 17'11 : P~UG BACK
b. T~
-L2 Lc ~ x~:~. ~,~: : ~, ' -
T~E SUPERIOR OIL COMP~
4. ~OC~T~O..~ OF..WEL~` (ReporSA0cat!on clearly and t~ a~cordance .with anl State requirements.* )
At proposed prod. zone
Same as above
14. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
7 miles N 21° W Tyonek Post Office
,,
--~. 'LkASE.DE~IONATION ~NO
-.ADL 03264
'k'~iF' I~DIAN;
State of~ALaska
~,.w,~ ~o.~ree..'~ile creek
state
~0. ~I~LD A~ PO0~, 0B WILDCAT
Wildcat~
A~D SUEVE~ OE ABrA
~/4 Sec 3, 'T12 N, RllW
12. B.OROUGH
Alaska
1§. DISTANCE FROM PROPOSED* 16. NO. OF ACRES IN LEASE 17. NO, OF ACRES ASSIONED
LOCATION TO NEAREST TO THIS WELL
PROPERTY OR LEASE LINE, FT.
(Also to nearest drlg. unit line, if any) 1320 640 160
[~. DISTANCE FROM PROPOSED LOCATION* 19. PROPOSED DEPTH 20. ROTARY OR CAIiI,E TOOLS
TO NEAREST WELL, DRILLING, COMPLETED,
OR APPLIED FOR, ON THIS I~E, l~f. NA 12,000 rotary
21. ELEVATIONS (Show whether DF, RT, GR, etc.) [ 22f APPROX. DATE WORK WILL START*
325 GRI July 1, 1967
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT
22"
]6"
15 10 3/4
9 7/s f ? 5/s
40.50
33 7-39
SETTING DEPTH
2-'00
2000
QUANTITY OF CEMEN=
300 sx to ~-r~_~_c~-
as required
as required
1.)
Hydril (2000 P.S.I)
Hydril - 2 Ram type
preventer on 16" casing.
(3000 PSI) Preventer on 10 3/4" casing.
IN ABOVE SPACE DESCRIBE PROPOSED PROORAM: If proposal is to deepen or plug back, give data on present productive zone and proposed new productive
zone. If proposal ls to drill or deepen directionally, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout
preventer program, if any.
24. I hereby certify that the Foregoing is True and correct.
Sr.
..,IG NED
(This space for Federal or State office[use)
CONDITIONS
.:
Drilling Engineer DATE Ap.ril 28, 1967
APPROVAL.DAT]~ ^
THOMAS .t~. ~ .........
Executive Secretary
":" ': *Sa~ Instructions On Reverse Side
I,IAY' 3 1967
DIVISION OF MINES & MINERAL~
ANCHORAGE
sag AON ~sO ~aS
BNOZIHOH HAI~D~OHa -
omen
xe 0~ ')anS- ,09
xs 0~: I ,8 ~SZ:', 00! ~
: sBnI4
zsd ~ a&
·
(pazaanbs) 0~
00~I ,~00~ #g'0~',,~/~ 0I
· p:t~'-~;~{~
· PH'~SO YZ£) _
OZ-Z9 ' ol~ :%x. utz~4
aHODH~ qqH~4Tq~GIAIGRI
~ aNlf SHSIIW &O NOISIAI~
..... Voooz-~sz-O'~' .... aaoo '~'