Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout161-031l~-ap[m lOJan95 LOCATION CLEARANCE REPORT State of Alaska OIL AND GAS CONSERVATION COMMISSION PTD No. 6/'O~[ Spud: 8/¢/6! , Memorandum To File: API No. Operator Location TD: [l.9~Q , Completed Hot. ~asin~ stz., .t, depth, ~t vol, · pzooedure. Long Csg = Liner .' Perf intervals - tops Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. Plugs: 500~ ~j /f,T(~. ~dRb $~. /[.~!2. /~~'~[~8. I~ ~ ~[q9 , ' r ' ~ ' W~ll head ~t off J ~ Marker post o= plat~ ~ .~D - ~ ~ Location Clearance ~ ~ , Conclusions: Code Signed .~.~ Date 9-17-64 Swan Lake ~34-27 Standard Oil Company of California - Swan Lake #34-27, S.E.~ ~ Section 27~ T. SN.-R. 7W. Location is level and clean. Marker is in place but reads #34-16 instead of #34-27. Otherwise O.K. CONFIDENTIAL COMPLETION REPORT - NEW WELL 'RECEIVED' OF_C Petroleum ,~ivls~on of Mines and Minerals ~ta~ka Dept. of Natural Resources STANDARD OIL COMPANY OF. CALIFO..RN..IA.-.._._WESTERN C~ERATIONS, INC. - OP~TOR AREA: Kenai Peninsula, Cook Inlet Area, Alaska LAND OFFICE: Anchorage Lease No.: A-029160 PROPERTY: Swan Lake Unit WELL NO.: SLU 35-27 SECTION 27, T. 8 N., R. 7 W-, Seward B & M LOCATION: Surface: 550' north along east section line and 1855' west at right angles from southeast corner Projected Section 27. ELEVATION: 355' DATE: November 28, 1961 DRILLED BY: Rowan Drilling Company (Rig ~33) DA~E COMMENCED DRILLING: August 6, 1961 DATE COMPLETED. DRIL!.~NG: September 25, 1961 DATE OF INITIAL PRODUCTION: None - Plugged & Abandoned September 25~ Z96l SUMMARY TOTAL DEPTH: 11, 984' JUNK: None PLUGS: 0 - -+ 20' l, 709' - l, 936' -+ 4'975' - 5,159' -+ 7,974' - 8,148' ll, O16' - ll,$12' ill, 412' - 11,712' CASING:. 30" conductor pipe cemented at 28'. 20" cemented at 130' w/420 sacks cement. 3/8" cemented at 1877' w/1800 sacks cement. (Top not located. ) (Top not located. ) (Top not located.) Page 1. Schlumberger Induction-Electrical Log~ interval l~ - 2. Schlumberger Induction-Electrical Log~ interval 299? - 8060'. 3. Schlumberger Induction-Electrical Log, interval 8060 - 11,64~'. 4. Schlumberger Induction-Electrical Log, interval 11~644 - 11,981'. 5. Schlumberger Sonic Log, interval 270 - 2983' 6. Schlumberger Sonic Log~ interval 2983 - 794~~· 7. Schlumberger Sonic Log, interval 794~ - 11~641'. 8. Schlumberger Sonic Log, interval 11~641 - 11,981'. 9. Schlumberger Microlog-Caliper, interval 136 - 2996'. 10. Schlumberger Nicrolog-Caliper~ interval 2996 - 8058'. ll. Schlumberger Nicrolog-Caliper, interval 8058 ~ l~. Schlumberger Microlog-Caliper, interval ll~ 644 - ll, 984'. 13. Schlumberger Caliper Log, interval 8000 - 11~644'. 14. Schlumberger Continuous ~Dipmeter Log, interval 2800 - 805?'. 15. Schlumberger Continuous Dipmeter Log, interval 8050 - 11~6~8'. 16. Schlumberger Continuous Dipmeter Log, interval ll~ 638 - ll, 981'. l? o Schlumberger Velocity ~urvey, interval ll~ 975 - 2000'. 18. B~roid ~ud Log, interval 1000 -. ll~ 984' · DRILL STE~ TESTS: None CO L TION' SWAN LAKE UNIT 34-27 (~1) Section 27~T. 8 N., R. 7 W., $~ward B & ~4 sTANnkaD OxL co. OPERATOR Page 3. Spudded at 8:30 PM, August 6, Drilled 15½" hole O - 64' August !'. 196~1~ Drilled l~" hole 64 -' 138' Opened 15½" hole to 26" hole 1961 6~' drilled 74' drilled 82 - 84 pcf mud 73 - 78 pcf mud 0 - 133' 133, opened 70.5 - 72 pcf mud Ran 3 jnts. or 130', 20"~ 94~ Butt welded casing~ equipped with Baker guide shoe~ and Baker Centralizer 20' above shoe. CEME~ING DETAIL: Cemented 20" casing at 130' in single stage around shoe with 420 sacks of cement treated with 2% CaC12 using Halliburton power equipment. Used i top and i bottom rubber plug. Pumped 40 bbls. of water ahead, mixed 420 sacks of cement in 21 mins. using Halliburton truck. Average slurry weight 120~. Full Circulation. Cement in place at 5: 30 P.M. Hookload weight of casing before cementing 37,000~ after cementing before landing casing 37~000~, and at time of landing casing 37,000~. Cemented through 2 ~/8" O.D. tubing hanging 10' above shoe. August 8, 1961 Welded on 13 3/8" head to 20" casing. Installed BOPE-and tested 25~/ psi. Held OK. Drilled out cement .and shoe. Drilled 12~" hole 138 - 1,818' 1,680' drilled Baroid Mudlogging Unit installed at 1000'. COMPLETION REPORT SWA Section RT~ T. 8 N., R. 7 W., Seward B & M Page Au ~gust 9~. 1961 Drilled 1R-~" hole l, 818 - 2, 124' 306' drilled Twisted off at 8:15 A.M. Left 6 - 7 3/4" x 2 7/8" drill collars, bit sub, and crossover sub. Length of fish 191.11'. Top of fish at 1933'. R~n 7 5/8'' O.D. Bowen overshot dressed with 6~" grapple. Engaged and re- covered fish. BaCk drilling at l~: 30 P.M. Drilled 12~" hole 2,124 - 2,881' 757' drilled August ..!0., 1.~.6_l Drilled t2~" hole 2,881 - 3,000' 119' drilled Ran Schlumberger Induction Electrical Log, interval 2997 - 134'~ Sonic Log~ interval 2983 - 270', and Microlog-Caliper, interval 2996 - 136'. Removed BOPE and 13 3/8" head. Welded on 20" conductor. Opened 12-~" hole to 18 5/8" hole 138 - 638' 500' opened Took Sidewall Samples, left 13 bullets in hole August 1.~,~ 1.961 Opened 1R~" hole to 18 5/8" ?ole 638 - 1,526' 888' opened 72 pcf mud August 12, 1961 Opened l~" hole to 18 5/8" hole l, 526 - l~ 880' 354' opened Reamed 18~TM hole 0 - l~ 880' l, 880' reamed Ran in with 12~" bit to check hole. Hole OK to 3000'. Circulated hole to run casing. 72 - 74 pcf mud 71 - 77.5 pcf mud 68 - 78 pcf mud COMPLETION REPORT roUT (#l) Section 27~. ~T- 8 N:,. ~R~ 7 W.. ~ Seward~ B & M STANDARD OIL CO. OF CALIFORNIA, W~O.I. - GPERATOR Page 5. A...Ugust 13, 1961 Ban 45 jnts. 13 3/8" casing CEMENTING DETAIL: Cemented 13 3/8" casing at 1877' in a single stage around shoe with 1800 sacks of~ cement using Halliburton power equipment. Used i top rubber plug. Pumped 50 bbls. of water ahead, mixed 1800 sacks of cement in 75 rains, using Halli- burton truck, displaced in 21 mins. using rig pumps. Average slurry weight ll6~. Bumped plug with 175© psi. Full circulation. Cement in place at 8:25 A.M. Hookload weight of casing before cementing llO, OOQ~, after cementing before landing casing lO0, O00~, and at time of landing casing 100, O00~. CASING DETAIL: 46 joints or Landing Joint Below K.B. 1,891.o5' 13 3/8" J 55 2.28 i Baker flexi-flow float shoe 1.65' Baker flexi-flow float collar 38.15' "1,"8 6 20.29_' Casing cemented at 877.12 ' Casing equipped with 2 Baker centralizers. · Aug~..s.t 14.~ 1961 Installed BOPE and tested with 1500~ psi, drilled cement OK. Ran in with 12~" bit and 1,833 - 1,877' 44' cement drilled Cleaned out to 3000'.. Drilled 12-~" hole 3, O00 - 3, 310' 310' drilled 65 pcf mud Drilled l0 5/8" hole 3~310 - 5~225' 1, 915' drilled 68 - 76 pcf mud COMPLETION REPORT SWAN ~ U~ ~-~7 (~l) Section 27, T. 8 N., R. 7_W., Seward B & M S~A~A~ OIL CO..T OF ~~Om~A]- W'O,X,' .~ 0~~0~ Page 6. A~ugust 18, 1961 .Drilled .lO 5/8" hole 5.225 . 5, B68' Twisted off at 5368' at 2:15 P.M. hole. Top fish at 5276'. Engaged and recovered fish. Aug~st ,l~,.~ 19,,6! Back drilling at 5 :OO 5,368 - 5,589' August 20 _, 26~...1961 Drilled l0 5/8" hole 5,589 - 7,679' August ~ 27,~ 1961 Drilled l0 5/8" hole 7,679 - 8,048' Conditioned hole August ,2~ ,19,61 143' drilled Left bit and 3 - 7 3/4" drill collars in Ran Bowen 9 3/8" overshot with 7 5/8" grapple. 76 pcf mud. Drilled l0 5/8" hole 221' drilled 090' drilled 369' drilled Ran Schlumberger Induction-Electrical Log, interval 8060 - 2997' interval 7944 - 2983', Microlog-Caliper, interval 8058 - 2996' 73 - 76 pcf mud Dipmeter 8057 - 2800'. August 29, 1961 Took Sidewall Samples. Drilled l0 5/8" hole 8, o~8 - 8,~6' 81 - 91 pcf mud 178' drilled 85.5 pcf mud , Sonic log~ and continuous 85 - 87 p cf mud COMPLETION REPORT SWAN lAKE UNIT 34-27 (~1) Section 27, T. 8N. R. 7 W.~ Seward B & M _ STANDA~- OIL Page 7. August 30.- . September Drilled 10 5/8" hole 8,226 - 11,183' S. epte..mber iL!~,. !961 Drilled 10 5/8" hole' 11,183 ' 11,359' SeDt~ember 12,~ !96~ Cored 7 5/8" hole 11, 359 - 11, 366' Core No. 1 , , 2,957' drilled 85 - 88.5 pcf mud 176' drilled 86 - 8? pcf mud Cut 7', recovered 1' 135 ' drilled 85 - 86.5 pc~' mud Cut 20', recovered 6' 85 - 89 pcf mud Reamed from 11,200 to 11, 359'. Opened 7 5/8" hole to !0 5/8" 11,359 - 11,366' Drilled 10 5/8" hole 11,366 - 11,393' September 13, 1961 Drilled 10 5/8" hole 11,393 ' 11,528' Cond/tioned hole to core. ~.eptember 14~.. 1961 Cored 7 5/8" hole 11,528 - 11,548' Gore ~o....a 27' drilled 7' opened 85 - 86.5 pcf mud Ran l0 5/8" bit. Hit bridge 3 stands off bottom. Could not break circulation. Pulled 15 stands and circulated 1500', off bottom. Conditioned mud. COMPLETION REPORT Se, ction .27, ~..j 8 N,..~ ~; .7. w.~ Sew~.rd .B & M STA~w~ OIL CO. OF CALIF©P3~L~ W.O.I, - OPERATOR Page 8. ~.eptember 15 Opene~ 7 5/8" hole to l0 5/8" 11,528 - ~1, Drilled 10 ~/8" hole 11, ~8 - 11, 6~2' Conditioned hole for logs. Septem. b.e..r 1.6,, 196! 20' opened 94' drilled 86 - 92 p cf mud 113' drilled 59' drilled Cleaned out 25 ' fill. Cut 20', recovered 18' 92 - 93.5 pcf mud 89.5 - 93 pcf mud 92 - 93.5 pcf mud 92 - 94 pcf mud Drilled 10 '5/8" hole 14 642 - 11,667' ...S. eptember .1..7.,. 196! Drilled 10 5/8" hole ll, 667 - ll, 78o' September' 18; 1961 ill i I , Drille~ l0 5/8" hole 11~780 - ll Cond~tioned hole to co~e. $.epte.mber 19, 1961 Cored 8 7/8" hole ~,839 - 11,859' Core No. 25' drilled Ran Schlumberger Induction-Electrical log, interval 11,6~4 - 8060', Microlog- Caliper~ interval 11,644-8058', Sonic log, interval ll, 6$1- 79~', and continuous Dipmeter, interval 11,6S8 - 8050'. C Ulv~LE~ION EEPORT Section 27, T~ 8 N., R. ~ W., Seward B & M "oIE'CO'- oF w'o,I, Page 9. Sept, e,m, ber 2,,0~ 1,~,6,! Opened 8 7/8" hole to l0 5/8" 11,839 - 11,859' 20' opened 11,859 - 11,9~8' 89' drilled 92.5 - 94.5 pcf mud September 21, 1961 Drilled l0 5/8" hole 948 - 11, 954' T.D. 6' drilled Circulated and conditioned mud. Ban Schlumberger Induction-Electrical log¢ interval 11,981 - 11,644', Sonic log, interval 11981 - 11,641', and Microlog-Caliper, interval ll, 98k - ll¢ 6~4', e~ud Caliper 11¢ 644 - 8000'. September 22~~ l~,61 Ran continuous Dipmeter, interval 11,981 - 11~6~8'. hole. Septe.m. be~ ~2 ~,.' 1961 Ran Velocity Survey with Geophone placed at 11,925, and 2000' Circulated and conditioned 93 pcf mud lO,O00~ 8000, 6000, 4000, . Picked up tubing and drill pipe. Prepared to plug. Sep~tember_ 24, 1961 Ran 380' of 2 7/8" tubing and ll, 332' of 4~" D.P. Hung pipe at 11~712'. Pumped in 300 sacks of cement treated with O. ~ HR-4. Preceded with 20 bbls water~ displaced with 157 bbls. mud. Cement in plate at l:O0 A.M. Hung pipe at 11~412'. Pumped in 300 sacks of cement~ preceded with 20 bbls. water and displaced with 150 bbls. of mud. Cement in place at 2:l0 A.M. Located top of plug at ll, 016'. Plug ~3: Hung pipe at 8148'. Pumped in lO0 sacks cement~ preceded with 20 bbls. water displaced with ll~ bbls mud. Cement in place at lO:O0 A.M. SWAN LAKE UNIT 34-27 (~l) Section 27, T. 8 N,,. R..7. ~W., Seward B.& }4 ........... ~ STANDARD OIL 'CO, OF CALIFORNIA, W.O.I. - OPERATOR Page 10. September 24, 1961 C_ o_ .nt. i. .nu. .e .d Hung pipe at 5149'. Pumped in 100 sacks cement. Preceded with 20 bbls. water~ displaced with 70 bbls. mud. Cement in place at ll:O0 A.M. Hung pipe at 1936'. Pumped in 200 sacks of cement. Preceded with 20 bbls. water, displaced with 23 bbls. mud. Cement in place at 12:10 P.M. Located top of plug at 1709'. Sep.tem. be..r....~5, 1961~ Laid down ~" drill pipe. Removed BOPE. Plugged top of 13 3/8" casing with 15 sacks of cement. Welded marker plate on 4" collar. Well abandoned and rig released 8:00 P.M., September 25, 1961. SRH: !o S. R. HANSEN COMPLETION REPORT SWAN IAKE UNIT 34-27 (~l) Section 27'~t,, T.~8 N., R. 7. W.~ Seward B & ~ Page 11. 1, 560' 1,870' 2,715' 2,980' 4,180' 4,617' 4,881' 5,099' 5~ 300' 5,650' 5,876' 6, Z74' 6,487' 6,675' 7,140' 7~670' 8,000 ' 8,250' 8, 541' 9, 300' 9,629' %9~0' 10,186~ 10,457' 10~876' 11, 642' 11,967 ' 0° ~5' Z° 30' 0° 45' 1° O0 ' 0° 15 ' 0° 45 ' 0° 0° 0° 1° 00' 1° 1° 0o' 1° o0 ' 0° 45' 1° O0 ' 0° 0 ° 30 ' 1 ° 00' 0 ° 1 ° 00' 0 ° 0 ° 0° ~5' 1° 00' 0° ~5' 0° 1° O0 ' 0° UNITED STATES DEPARTMENT OF THE iNTERIOR G~ICAL SURVIEY SUNDRY NOTICES AND REPORTS ON WELL$ ifll It tide ' -.' UNITED STATI~ ' '-'" ~A~MENT ~THE INTERIOR . f"~ ' 'i' ; "-' Budge4 Bm'omi No. 42,,R3S8.4. ./ ON ......... ~- ~', OCT ~ ~ 1962 o~ Mines and Miner~ ~'.'~ o~ Na~d ~~.~ WATER ~HUT-OIrF .... :~ ~'~ ~ ~... br tho Gmdmm~md S4m~ bdm ommmebm mm~ be mmeomd. -- . UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Budget BUreau No. 42-R356.5. Approval exPires 12-111-60. · ^,o O~F.~ ..... A_ncho~gt~ ............ U,,T ......... ~_~.n.__.L~._~__e. ............... LE$SEE'S MONTHLY REPORT OF OPERATIONS 5']ze followinff is a correcg report of operations and prod~cgioT, (includin~ drillinff and prod~ci~ wells) for the moTz, th of ............ ~ep~e~_e~ ............ , ~9_~!, ............................................................................ J~ent's address P. 0. Box 7-8J9 ....... ~ StUd 0~. ~ C~if, ............................................................. ~'ompany ~_~~~~~~~~/ .......... ..................................... ........................ .... r-- "~ ~ ~ -~;-:su~:~~ ................. ~EC. AND 8N 7W ! 27 t ' GAL~,O:;S or B.~U}~;LS O~,' RES~IA RKS :~v'-ELL I I)A~S CU. ~'T. OF GAS TWP. I{ANGE I~O.i Paovccn~~AR~EL8 OF OIL GRA~XTY (111 thousands) OASOLINE ~}'ATER (If (If drilling, depth; if ,.hat down, - ~ECOVEi/FD D011P, SO s{ate) date and r~ult of t~t for con~ent of SW~ ~ UNIT I 11~359~ ~- 11,366'.~ Cut: 7', recovered 1~. I ~ened ¢ 5/8" Co~ed 7 ~%/8" hole ~1,52~' - 11,5h8'~ Cut ~0', rec,~red 6'. 11~642'~ R~ I-~ Log ~1,6~' - 8,~0~, ~cro Log 11,6~' - ~o~e ~1~o ~/~" .~ ~e~ ~o ~/~ ~o~. ~,~' - n,~., ~.~. ~ ~-~ Log 1~,9~1~ - ~,6~, ~.o:o Log ~1,98h~ .. ~,6~'~ TopkSi~ewall S~leso ,anvel~ty.u,e,s. Cem,,nted ab ~7 2~ ~th 0 sac cs ce~nt, Plug ~2 ~ ~1,5~~ ~ith sa0ks ce~nt. Loqated ;on of Plu ~2 9 11 116". e~nted PlUg ~3 ~ 8,141' ~th 1)O sacks c ~nt. Plag ~4 $ 5,149' ~th 1)O sacks c~ment~ Pi~ ~5 ~ 1,936' ~th 2~ sacks c~ment. Loeated~top of PlUg ~5 ~ 1,709~ Ce~nted s~face pl~ ~th 2% sasks c~nt~ We~ded o~ m~ker p~.ate. Well ab~d. med ~d Rig re,eased Septe~er 25, ~961. , 1 ~icht iel~- C~ W. Perry- R. File~ , ~rodu~ing R. RiOter There were ...................................... runs or sales of oil; .............................................. M cu. ft. of gas sold; ............................................. runs or sales of gasoline during the month. (Write "no" where applicable.) No~r.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding month, unloss otherwise directed by the supervisor. Form 9-329 (January 1950) ~6--25700-8 u.s. ~ow,N~z,r ,~ts',,~ or, c~ PRODUCING DEPARTMENT TELEPHONE BR. 7--620! C. VL CHAT-FERTON DISTEI~T SUPERINTENDENT U. $. Departaent of the Integer · ~=~ & wild]Ale Serviee [eaai~ Alaska Attention, ~r. Jeha B. ~ek~ Dear Sir, The Swan Lak~ Unit #1 well location has bee~ pre~ and is read~ £c~ 4ri ,lting with the ex~ept~on ~ a ~ ~f lrat4r.. well was ~lle4 on the loea%~ i~ the ease ~anner as i. pre- d~ ~ the $~~ ~~ ~ld, ~ ~ ~ ~ fo~ti~ In ~ of our failure ~ obtain ~ater fl~m & ~ell, lee r~q~e~t per~eei~ to ~thdrae au average rate of ~ bam~t~ (It~ gallen) per 24.heu~ day frc~ the lake i.~ed~ately south of the prepared loeati~a. Thi~ lake i~ etas%ruer a teaper~_ry aeee~a road aroe~d the eaaterly ead of the well location tea point aear the lake fro~ M~Loh a ~[en plaak worM;Lag pla~fc~a ca~ be installed for .u~~ of the pu.~. The platf~ ~ be about ~0 feet frea %he edge of the lake with a diversion for suction Original Signed .C.V. CHATTERTON _ NOTED AUG 1 196i PHIL K. HOLDSWORTH Commi~. i.one~ , , ? UNITED STA'rES _., -' DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY LESSEE'S MONTHLY REPORT OF OPERATIONS 2'V~e /bllo'wing is a correct report of operations and productio~ (incl~din~ drillin~ and prod~cin~ we~ls) for ~.~e m. onth of ............. ~_~P~_ ...............!9_61 --- ' ............... :--'St~.a~ ~-~-'b'f'-~Tif'; ...... ........ p.._0. .......................... ..... ~o:~ ............................. B~o~aT.. 7-620~ ................... :4~-,~ ',~ rigid' .._ Dl~t, -SupS, ~ Al~a ............. )~ OF ~ TWP. tl. 3_NGE~¥FLL ~O. I~ARRE~ OF OIL (JBAVF~Y ... , ~ , .~ ~ . ; (~A[qO INE ~,VATg t (][ I (If drilHng~ ,~,,.H~: if ~hut d~.wn, cause; SLU' 34-27 (~) 27 8N ~ Spudded 8~30 p.~. ~u~st 6, ~961. Drilled ~" ho14 to ~38'I opened hole S'~ ~t~ 420 sacks o I~talled Class II BOPE. brilled 12~" hole to 2124'. SE~ ~ted Off at 2124', to~ fish 1933'. Recovered fish and drilled ~e~ ~ 3OOO~ ~ logs ~d ~ok sidewa~ s~ples ifor P~ologic~ i~$r~t~on at lOOO~ to ~O00'~ ~ened 12}" hole to'lB 5/8" to 1065' - 3000'. qemented 13 3/8" casing at 1877' ~bh 18OO ~acks~ I~t~led & t~sted IBOPE. Dr~led !0 5/8" ho~e 3000' ~ 5368'. ~isted off. Lef$ bit i~d 3 D.C.~s ~'hole. Tot fish ~ ~276'. Ran B~en ~ershot and caught & recovered ~tsh. Drilled 10 5/B" hole, '5~8' - 8048'. R~n 804t 8041 I=ES iLog 8060' ~ 2997'. Sonic i _ ~996~o Took Sidewall samp] ~ - ~747'. cc~ U.S:G.S. - M. ~. So~.~ter Alaska O & G C3 - D i D. Bruce Richfield - C. W. Perry - R. ~ Fil~s .. Producing Exploration Land Log 7944' - 2983! and Micro Log es o Dri'./led 10 ~/8" hole -I- . Ritter No~E.~There were ...................................... runs or sales of oil; .............................................. M cu. ft. of gas sold; ....................................... ...... runs or sales of g~solinc during the month. (Write "l,)" where applieable.) No~.--Report on this form is required for each c~lendar month regardless of ~he status of operations~ and mus~ be filed in duplicate with thc supervisor by the 6th ot bhe succeeding month, unless otherwise directed by the supervisor. For~t 9-329 (January 1950) 16--25766-8 U. 5. GOYERN~ENT rSlNTISa OF£1CE Mr. C. V. Chatterton Standard Oil Co~any of California P. O, ~ox 7°$39' Anchorage, Alaska Dear Hr. Chatterton,' Your a~lication for pemit to drill ~all No. "S~an Lake Unit" ~-27, Sec. 27' T.SH.,R. 7~., Seward Bid/ is approved subject to the £ollowins conditions: 1. Hud fluid of sufficient v~ishe ~ proper consistency to prevent blowouts shall be used in drillins the well and the column of mud £1uid shall be maintained to the surface at all times, particularly while pullins the drill pipe. 2. Adequate blowout prevention equipment shall be provided and tested before d~lll~u~ belo~ the shoe of the surface casin~ ~ maintained ready for use at all times. 3. The character of the fluid content of each porous formation shall be deteru~Lned in so far as possible and, if of camm, rs cial value shall be protected in a monet approved by this Division. . This Division shall be consulted regardinS the exact cementin$ depth of the 7" casins after corins m~d/or makin~ the electric isa and before rmmin~ the 7'* casins ~nto the hole. Other re- quit,nests may be outlined at that time. The hole shall be drilled in such a manner and pluiaed or coee~, in the event of 8bandomnent or suspension of drill~ng, in such a manner as to prevent contamination or dmn~$e to any oil-or*$as*bearin8 strata or any fresh-water strata. Yours very truly, DDB:bb DonaId D. Bruce Chis f, Petroleum Branch APPLICATIO~ FOR PERMIT TO DRILL, DEEPEN OR PLUG BACK APPLICATION TO DRILL~] DEEPEN [] PLUG BACK [] NAME OF COMPANY' OR OPERATOR Address City State DESCRIPTION OF WELL AND LEASE Name of lease [ Well number Elevation (ground) Well location (give footage from section lines) Section township~rango or block & survey Field & reservoir, (If .~-ildcat; so state) - I County Distance, in miles, and direction from nearest town or post office A~r~tely l? miie~ ~~ bi SteFl~. Ala~h Nearest distance from proposed location Distance from proposed location to nearest drilling. to property or lease line: completed or applied~for well on the same lease: ........ ~~ ~'J feet . Proposed depth: [ Rotary or cable tools Approx. date work will start Number of acres in l~se: feet Number of wells on lease, including this well. completed in or drilling to this re~qervoir: If lease, purchased with one or more wells drilled, from whom purchased: Name Address Status of bond Remarks: (If this is an application to deepen or plug back, briefly describe work to be done. giving present producing zone and expected new producing zone) ST~HDAXD OiL CO. OF CALIFOf~XA CERTIFICATE: I, the undersigned, state that I am (company), and that I m author~ed by s~d comply to make ~is report; ~d ~at this report was pre- pared ~der my supe~ision ~d ~ection ~d that the facts ~e~a~rec~d cgmplete to s~ C.V. ~~~~ /'/ ~ermit Number: Approved By: Chie~ Pebrolo~ Brach ~otice: Before send~g ~ this form be sure that you have ~ven a~ ~formation requested. ~ueh ~neeessary correspond- ence wffi thus be avoided. See Instruction on Reverse Side of Form Alaska Oil and Gas Conservation Commission Application 4o Drill, Deepen or l~Iug Back Form No. P-1 Authorized by Order No. 1 Effective October 1, 1958 (Feb. 1~51) (SUBMIT IN TRIPLICATE) UNITED STATES DEPARTMENt Of the INTERIOR GEOLOGiCAL SURVEY Land Office !..~ No. Unit Budge( Bureau No 4{ Ai,{,roval oxplr~ 12 3! ~0, Anchorage 027160 ..... Swan Lake SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL NOTICE f.)~' INTLNIION I0 LHANC~= PLANS NOTICE OF INTENTION TO TEST WATER SHUT-OFF NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL NOTICE OF INTENTION TO SHOOT OR ~,CIDIZ£ NOTICE OF INTENTION TO PULL OR ALTER CASING NOTICE OF INTENTION TO ABANDON WELL SUBSEQUENT REPORT OF WATER SHUI'-4:~:F SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING SUBSEQUENT REPORT OF ALTERING CASING SUBSEOUENT REPORT OF RE-DRILLiNG OR REPAIR SUBS£QLJEN'I' REPORT OF ABANDONMENT SUPpLrcMENTARY WE[_[. HISTORY (INDICATE AliVE BY CHl:-¢_t~. MARK NATURE ()F REPORT NOTICE C)R OT~IER DATA, July 11 .aporoxlm~tely Welt No. SLU 34-27is iocated/ ~60 ft. from ~ E S linc a,,d 1980 ft. from 11~ line of sec. SE ~ ~oJ, Sec, 27 _T_. 8 N. R, 7 W. Sewed B & M Wildcat Ken~ Peninsula Th, elevation o~ the ~ a~ve s~ level is ,1961 27 ._ DETAILS OF WORK {.~tate nam~ of and exp.~ct~ depths t{, objective aand,, show ~{~. weighta, and lenlths of pro~,~ ca&inls; J~l~te muddinI job*, inI ~ints and al] other im~rtamt propo~d work~ 2. D~!I to 3~I log & cement 13 3/8" easi~ to s~face ~ o 3. I~t~l & ~est Class III Bl~out O~ventlon E~ip~nt. ~. Drill ahe~ to ~prox. lh,l~', log, core & te~t ~ile drillin~ ~ w~r~d. / 5. ~ ~ cement 7" casi~ in two stages, & co~lete as directed or abaton [ undmtand that this plan of work n~ust receive approval in writing by the C~ologicel [;urvey before operations real be commenced. Oompan.~ . oT~J~D .k~ 61L COMPANY OF ~' P',P?J;iA~..~ , Westor,q <:~r~tJon,, ina Ad&-ess '~x 7-839 __ ..... hnchor~e, Alaska