Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout162-024lc-apfm
10jan95
LOCATION
CLEARANCE
REPORT
State of Alaska
OIL AND GAS CONSERVATION COMMISSION
PTD No. ~Z-(~
Lease
Memorandum To File: API No.
Well Name
Opera tot
Location ..c~c 6) ~-~.33 P.. l,~ &O3
Abnd Date
Spud: T/Zo/6z, TD: /~. 9~ , Completed
·
Note casing size, .wt, depth, cmt vol, & procedure.
Liner:
Perf intervals - tops:
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
/.
74 oo ;
Well head ~t off: %~[ ~f~+~ ·
~rker post or plate: ~
/
Looation Clearance: /~ ~p
/
Conclusions:
Code
Signed
Date
. ,
Unocal Oil & Gas
Unocal Corporation
P.O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL-
Craig K. White
District Exploration Geologist.
Alaska District
August 1, 1989
Hr. Lonnie C. Smith
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Hr. Smith:
As requested by the A.O.G.C.C. through A.O.G.A., we 'are providing replacement
copies of reproducible (sepia) logs for Unocal-operated wells, as follows:
Canoe Bay Unit #1 (Pure Oil Co.)
Cannery Loop Unit Ill
Cannery Loop Unit #2
Cannery Loop Unit #3
Clam Gulch Unit #1
Grayling 1-A. ~
Kasilof Unit #1
Kenai Unit 41-18
Knik Arm Ill
Knik Arm St. #1
Kustatan #1
Kustatan #lA
Ninilchik Ill
Pittman Ill
Pretty Creek Unit #2 (Chevron)
Trading Bay Unit
West Trading Bay St. #1
5" E-log
2" E-log
5" BHC, 5" Density= E ~eG ~
5" BHC ~ ~ ~_o
5" Density, 2" DIL
2" E-log
2" E-log
Hudlog
2" E-log
2" E-10g
2" E-10g
2" E-10g
2" Sonic '--- .3. z.~e~
5" Microlog
5" CNL, 5" Neutron Ct. Rate
GR-Neutron (tie in), CET log
2" & 5" Sonic, 5" Density
2" & 5" BHC, 2" & 5" E-log
Please return one copy of this letter in acknowledgement of your receipt of
this data.
BWS: da
2755E
Craig K. White
A N C 11'0 1~ A C :!
Trans,'.:'lrted hercwl, th arc thc fol!<>v.,:;.::g-
Run No.
Sepia Blue Scale
ea. I ea.
Induct :ion T:.i cc:l-lc.a!
Du,::l l~d,,c' ir,:',. La"~--'] o~,,.,...~
BriC. Son;c/Cal:.p~r Log
BliC SonSc/~ ..........
BIiC Sonlc./Cal ~'*,*r/¢'o'' ..... Ray
Format ion Sonic Lo%. :.s)
Fo:ma:ion Co:::pensaSed Soy;i:: :,.'-'2 (Ganma
Formation Density :"'""-'-o F'FJ:. .
Neutron I,o2
FormatJ. on N.¢,.~ ..... o,, Lo2
t!igh Resolution Dip:mte'r (I!DT)
~O:,~ Safety Pr:hr
CDH or Prin::,:,:.
CDH Polar Plots
Proximi:y ~.:5 c7o1 os/Cal iper I,og
Gamma P :-tv- N e ut ?"Oil,, ~ ,t,' ~r
gamma Ra,/ Collar I,og
Cement Bond I.og
Sidewa!/ Neutron Porosity
Laterlog 5
Nud 1 os
Core Descriptions, Co;,:e,:,~.]onal,
Core Dosc:iptions, S].dewal]
Core Analysis
Forma~lon To>cs
DirecZiona! Surveys'
Core Chips
Sample Cut
·
DIVISION OF OIL AND
ANCHC~AG~.
RECEIPT ACKNOWI,EDGED:
RcFU,,N RECEIPT TO'
· // /
..c ?:. y ... D,VI'i:. '
Union
·
Anchorage, Alaska '39503 Attn- Rocholle Carlton
Forxn 9-881a
(Feb. 1951)
A~cia~rage;~ , ~,aSka
[ i i ~ (SUBMIT IN TRIPLICATe)
...... {_, .... { ...... {
{~ .... $ .... { .... -I DEPARTMENT OF THE INTERIOR
{ '] ~dflon of Mines and Mi~e~&~OOiGAL SURVEY
Budg~ Bureau No. 42-R~58.4.
Approval expires 12-31~.
lmnd Office ....... ~ ...................
t....o. Com.A0r.Alasha
.... ~. ............. :- .... .-.---...
Unit ............... 2__'._:_;'_, .........
Surf. Location-?atented
BHL- ADL 00592
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO DRILL ....................................... SUBSEQUENT REPORT OF WATER SHUT-OFF ............................
NOTICE OF INTENTION TO CHANGE PLANS ......... ~ ................... SUBSEQUENT REPORT OF SHOOTING OR ACID{ZING ......................
NOTICE OF INTENTION TO TEST WATER SHUT-OFF .................... SUBSEQUENT REPORT OF ALTERING CASING ....................... { .....
NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL ............... SIJBSEQUENT REPORT OF RE-DRILLING OR REPAIR ................ { .....
NOTICE OF INTENTION TO ABANDON WELL .................................................................................................... { .....
(INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA)
Well No ...... ~_1_ ........ is located _1'_ _4_3_'_ 7_ _ ft. from_'_~ ~r~'line and ____1___4_2:_9_ ft. from J,~-,~ljne of sec ...... _6__ ....
04 See. and Sec. No.) (Twp.) (Range) (Meridian)
_~_~~__k_~_:w___~t .............. ~~__p_i_~~ .......................... ~_s_g_.a_ ...................
(Field) (County or Subdivision) (State or Territory)
The elevation of the derrick floor above sea level is 1_6_&._5_ ft.
DETAILS OF WORK
(State names of and expected depths to objective sands; show sizes, welghts~and lengths o~ proposed casingsl indicate mudding jobs, cement-
ing points, and all other important proposed work)
'L ......
2. Pluoo:ed at. s~.oe vita ]L 0
3. 8~ plate w~ed o~ ~ace.
4. Erected 4" a~mnent maas. er.
No commerct~ oc~ce$ of oU ~r gas encountered.
I understand that this plan of work must receive approval in writing by the Geological Survey before operations may be commenced.
Company .... _U_:~_O_~___O_:~__~,__:~__~___ ~_~___~_,_.___O-~~ ........................................................................
Address 2805 DenaH 8tre~t
...................... ~g~~,___~_m~ ..............
2 - USGS, Anchorage
Title .......... .D__l._S~__c_l:____B___n~_._~?_.~_ ................
GPO {~1040
0 100
To~zl Feet
1 O0
100 500 400
500 4,:Z00 3,700
4,200 10,370 6,170
10,370 12,700 2,330
Union OJ/Co. of Cell/., Operet:x
Sec. 6, 'I' I S, R 13 W, $. M.
~t, surfaco sand
Sandstone
8Utstono, Uqnlte, mLncx' sandstm-,e
occ~slon&1, oongb:ne~ate
12,700 14,940TD2,240 8Lttstone
OP~R$,, TOR_
FIELD
WELL
SURFACE
LOCATION
ELEVATIONS
QONTRACTOR
_EQUIPMENT
COMMENCED
DRILLING
COMPLETED
_DRILLING ,
STATU_____~S
UNION OIL COMPANY OF CALIFORNIA
OPERATOR
COM PLETION..REPORT
Union Oil Company of California, Operator
Exploratory, Kenai Peninsula, Alaska
Ninilchik %%!
C~ONF) DENTIAE
RECEIVED'
JAN g l§B~
Petroleum Branch
Div;sion of Mines and Minerals
Alaska Dept. of Natural Resource!.
! 489' due west and 143.7' due north from southeast corner
of Sec. 6, T 1_8, R !3 W, SM.
NOTE: This is a-directed hole.
Ground ! 48.6
Kelly Bushing ! 62.55
Derrick Floor ! 59.4
NOTE: All measurements
from Kelly Bushing.
Coastal Drilling Company
Drawworks - Emsco GB 800
Power - Four GM C 6- 71 twin diesel engines
Pumps- ~! Erasco D-850 (8-1/4" x 18")
Power- Four GM C 6-71 twin diesel engines
%%2 Gardner Denver F X L (8" x 20")
Power- Tail Driven from Drawworks
Mast: IDECO Full View
Drill Pipe: 4-1/2" - 16.6~ Grade E with
7-1/2 x 40' drill collars
6 x 40 drill collars
July 2 0, 19 62
November 21, 1962
Well Abandoned December 2, 1962
CONF) DENT)AR
Title .__ District M anaaer
Union Oil Co. of Calif., Operator
Ninilchik ~1
CONDITIONS AT BEGINNING
OF OPERATIONS
CONDITIONS AT END OF
OPERATIONS
NEW WELL
Total Depth: 14,940', Plug and abandoned
20" C 193' w/600 sax
13-3/8" C 2046' w/1800 sax
9-5/8" C 7430' w/2800 sax
Bridge Plug 3886'
~P 3824', sqzd-tight)
~P 3772-3782')
(JP 3761', sqzd-tight)
12-1/4" hole to 7450'
10-5/8" hole to 8810'
8-1/2" hole to !4,940' TD
Cement Plugs: 12,700-12,600' w/45 sax
10,450-10,350' w/45 sax
7450-7400' w/50 sax
3812-3718' w/36 sax
! 5- 0' w/! 0 sax
Steel surface plate
..D..ate ~
!962
7-20 45
Remarks
Spudded in with 12-!/4" bit at 3 PM, July 20, 1962.
7-22 200
1 4" 6"
Drilled 12-.1/4" hole to 190', opened 12-../ to 2 and
drilled to 200' Cemented new 20" 59~ and 78 6~ buttwelded
casing at 193' with 600 sacks construction cement. Installed
!2"-3000 BOP.
7-28 2062
Drilled t2-!/4" hole. Ran Schlumberger to 2062'. Removed
BOP. Opened 12-1/4" hole to 18-5/8". Cemented new
13-3/8" 54.5%% and 61-~ casing at 2046' with 1800 sacks con-
struction cement. Installed and tested casinghead~dual
hydraulic Shaffer and GK Hydril BOP.
7-30 2522
Drilled 12-1/4" hole to 2508'. Set whipstock ~! at 2508'
and began to directionally drill well.
8-7 5042
Directionally drilled 12-1/4" hole. Set whipstock ~2 at 30!3'.
Mud: 85~, 44 sec, 4.0ml/!Smin., I0gr/gal.
8-17 6490
DirectionallY drilled 12-1/4" hole. Set whipstock 4~3 at 5455'.
8-28 7558
Directionally drilled 12-!/4" hole to 74!0' and 10-5/8" hole
below. Set whipstock -~4 at 7037'. Ran Schlumberger electric
log co 7557'.
Union Oil Co. of Calif., Operator
Ninflchlk 91
Date_ ~
1962
9-10 8,810
Plug 74 61
Remarks
Directionally drilled 10-5/8" hole. Ran Schlumberger electric
log to 8810'. Pumped in 40 sacks cement at 7500'. Opened
10-5/8" hole to 12-1/4" to 7450' and drilled off cement plug
from 7453' to 7461'. Cemented new 9-5/8" 40 and 479 N-80
~meline casing at 7430' with 2800 sacks cement.
9-!4 8,855
Reinstalled and retested 12" - 3000 BOP. Drilled out cem'em.t
and directionally drilled 8-1/2" hole below 8810'.
10-4 10,674
Directionally drilled 8-1/2" hole. Mud: 925, 54 sec, 2.4 ml/
15 min.. Ran Schlumberger electrical log to 10,661'.
10-15 11,940
Directionally drilled 8-1/2" hole. Cut Core %%1 from 10,674-
10,701' and Core 4~2 from 11,574' to 11,601'. Laid down monel
drill collar and discont/nued survey at 11,574'.
10-27 12,054
Drilled 8-1/2" hole. Ran Schlumberger electrical log to 12,854'.
11-2 13,453
Drilled 8-1/2" hole. Cut Core ~3 from 12,854' to 12,874'.
Mud: 102%~, 52 sec., 3.0 ml/15 min.
11-7 13,814
Drilled 8-1/2" hole to 13,806'. Ran Schlumberger electric logs
to 13,806'. Ran in with string reamer 33 stands above drilling
assembly. Reamed tight hole from 8000-8500'. Drilled 8-1/2"
hole to 13,814'.
11-21 14,940'TD
Drilled 8-1/2" hole to 14,940'TD. Ran Schlumberger electric
logs to 14,940'. Stuck and recovered dipmeter.
11-26
14,940'TD
3900'Cmt
plug
Plugged 8-1/2" open hole from 12,700-12,600' with 45 sacks
construction cement. Plugged 8-1/2" open hole from 10,450-
10,350' wi~h 45 sax construction cement. Plugged 12-1/4"
open hole and shoe of 9-5/8" casing from 7450-7400' with
50 sacks construction cement. Plugged 9-5/8" casing from
4000-3900' with 35 sax cons~uctton cement.
11-28
14,940'TD
3763 Cmt
Plug
Found bottom 108 joints drill pipe partially plugged with cement.
Appeared that last plug partially set up in the drill pipe and was
not totally displaced into casing. Ran in with 8-1/2" bit,
drilled out cement stringers 3596-3812'. Cleaned out to 4044'.
Scraped casing and cleaned out to 4044'. Set Baker Model "C"
cast iron bridge plug in 9-5/8" casing at 3890' (E-log).
Union Oil Co. of Calif., Operator
N infl chik 91
Date
1962
11-29
Depth
14,940'TD
3707'Cmt
Plug
R ~em. arks ................................
Squeeze cemented 4 - 1/2" JP holes at 3828' (E-log) with 29
sax construction cement. Stood cemented four hours. Squeez-
ed cemented 4 - 1/2" JP at 3765' (E-log) with 12 sax construc-
t, ton cement. Stood cemented for 16 hours.
11-30
! 4,940' TD
3850' Cmt
Plug
Ran in with 8-1/2" bit on 9-5/8" casing scraper, Drilled out
cement 3707' to 3850'. Jet perforated 4 - 1/2" holes per foot
3776-3786' (E-log), Ran in with Howco tester on dry 4-1/2"
drill pipe, Set packer at 3733' with tail to 3745'. Opened
tool at 6:40 AM. Had light blowfor three minutes. Closed
tool at 6:43 AM for ISI. Opened tool for flow test at 7:20 AM
after 37 minutes ISl. Had gas to surface in 1 minute and mud
to surface (rathole fluid) in 6 minutes. Open on 1/2" bean.
Recovered gassy mud graduating to gassy water in 17 minutes.
Steady light blow of gas and water. Opened on 3/4" bean
after 35 minutes. Pressure slowly decreasing and gas blow
decreased to nothing. Dead after 62 minutes. Remained dead
for 13 minutes. Glosed tool for FSI at 8:35 AM ending a 75
minute flow test. Backscuttled hole clean and recovered 3700'
fresh water with no free gas, Pulled packer loose at 9:23 AM
ending a 48 minute FSI. Charts showed tool had functioned
properly.
Outside_ Re~rdgr Inside Recorder_
IH 20669 20659
ISI 15489 15359
IF 8429 8289
FF 1442,~ 13989
FSI 15089 14959
FH 20149 20249
12-1
14,940' TD
Plug and
Aband.
Ran in with open end drill pipe. Plugged from 3812' to 3718'
with 36 sax construction cement. Stood cement 4 hours.
Found top of cement plug at 3718'. Pulled out laying down
drill pipe. Removed blowout equipment, Plugged 9-5/8" cas-
ing from 15-0' with l0 sax construction cement. Installed
steel surface plate and well marker. Well abandoned at 4 PM
12-1-62.
JOB NO.
REPORT
and
PLAN
of
'RI~CEIVED~
JAN 25 '1_953 ,:,~,~
Petroleum Branch
Division of Mines and Minerals
Alaska Dept. of Natural Re~ource~
SUB-SURFACE
SURVEY
UNION OIL COMPANY
NINILCHIK Nfl
NINILCHIK, ALASKA
]:)ATE. OCTOBER 1962
DRILLING CONTROL CORPORATION
3327 LIME AVENUE
LONG BEACH 7, CALIFORI~IA
DRILLING CONTROL CORP.
SURVEY DATA SHEET
SHEET NO. I
DATE
JOB NO ..........
FIELD NtlI~!~P--,I'I t Jr ,,
COUNTY.
STATE,
,
TRUE RECTANGULAR COORDINATES
MEASURED DRI]:'T DEVIATION DRIFT
DEPTH ANGLE VERTICAL COURSE DIRECTION .......
DEPTH NORTH SOUTH EAST WEST
~ 6~ 15' 2607 46 9 ~ S 700 If 3 44 '9 69
27(~ 6° 30' 2701 85 I075 S 71° If
2830 6,0 1S* 2828 10 1383 S 71° # 1144 32 93
2950 5° 45' 2947 50 12I C~~ 72° If 15
3042 5° 30' 3040 07 2 !:88S 85° If 1717 S3
3117 0e 00' 311~ 66 7 74 [ $. 86° If 17
3223 6e 45' 3218 93 1.2 46 ....S 86° If 1858 73 16
33],5 70 45' 3310 09 12, 41 x 89° If 18 36 8557
3449 8° 45' 3442 53 .Mi 38 lq89o If 18
3~4 9° 450 3516 45 121 70 ~ 870 If' 17 33
3658 11° 00' 3647 99 25:5~ lq 86° If 15 55 14414
3811 11° 30* 3797 ~2 30 51 lq 84° If . ~ 36 17449
3M8 12o 150 393/ 801 29!07 x 83° If 8 82 20334
4120 IIe 30* 4100 34~ 3429 lq 83° If 4 M 23/
4211 13° 000 4189 0l 20! 47 Iq 81° If ].
~ 14° 15' 4280 12 2314 NS0O# 2 57 28038
440~ 14° 30' 4375 CO; 2454 N 80~If 6 ~3 30455
4504 15o ,~e 44'7221 2741 N 78° If 1253
~ ]:Se 45' 4547 24 21117 lq 770 # 17 29 351
4676 15° CO* 4638 OO: 241 33 N 77° II 22 W:, 375169
4770 15o 30' 4'72866 25 12 N 760 If 28 94 400!04
4863 XS° 15' 4818 3924 45 N 76o If 34 76 423;; 81
'" "' ' l, , ,
DRILLING CONTROL CORP.
SURVEY DATA SHEET
SHEET NO. 2
COMPANY ....... [~IL~L~ Oil, ~
DATE ~~ 1962 JOS~NO...
W £ L L~--~-~'. FI ELD ~__'.___[~k,. COUNTY.
MEASURED DRIFT TRUE DEVIATIOI~ DRIFT RECTANGULAR COORDINATES
VERTICAL
DEPTH ANGLE COURSE DIRECTION : , , - REMARKS
DEPTH NORTH SOUTH EAST WEST
~. lSo IS~ ~ 52 28 9~ ~ ?6° if 41
~I ~o 4~* F:~ 29 34 20 N 71o ti 59 g2 512:35
~ 15° 50' 5247 16 22 98 N 72° W 67
54~ 14° 15' 5407 22 4 43 N 83* W ~ ~5 57576
,5498 14o 30' 5431 42 6 25 N 83° if 81 35
5691 ~ 30' 5619 Ca 27 78 N 850 if 86 r2 627
5844 ~.o 45, 5768 24 33 7'7 N 82o if ~
6G~ ~o O0~, 594~)19 38 ~6 N 80° W 90 ~ ~ 40-
6229 .12~ 45' 6144 25 44 14 N 79° if 1t)6, ~ 7411'3
6,381 12o 45' 6292 50 33 55 N 78° if 11,3
6490 12° 30' 6398 92 23~ N?4°if 120 10 79723
6618 12° 45' 6523 76 28 25 lq 76° if 126
6701 ~3o GO* 6604 63 1t307 Iq 740 u 131
61371 I;3° 45' 6769 75 40 41 Iq 73° if 143
7CIC~r 12~ 45' ~ 65 36 64 N 71° if 155 ri 9],5 87
7t:156 ~o 00, 6050 23 3 95 N 79° # ~ 16 919
7109 12° 30' 7001 97 1!47 lq 82o if L~ )6 g~Jl
71~ 12o 15' 7'W~ 69 11 ~ lq ~o if L~ LI 942139
'7234 11o 45* 7124 24 14 OS lq ~o if 161 17 cK~6 130
1328 12° 00' '721619 19 54 N ~o if ]64 i2 97610
7408 12° 00' '/29444 16 03 H 81~ if 167 ~2 99252
7669 Il- 00' ~ 64 49 GO Itl 81o if 174 ~Q ~'~t ?1
I
,,~1 ,
·
DRILLING CONTROL CORP. SHEET
SURVEY DATA SHEET
COMPANY ~at_'[~a~a O~_i C~. ~. DATE: .... ~, l'(~f-'~- JOB NO
WELL__ ~'~_~.~';~_~'~.~ FIELD 'L~i~--~__a~__ ~.~' COUNTY STAT~~,.. ~..
TRUE RECTANGULAR COORDINATES
MEASURED DRIFT DEVIATIOI~ DRIFT
VERTICAL ........ REMARKS
DEPTH ANGLE COURSE DIRECTION .........
DEPTH NORTH SOUTH ' EAST 'WEST
'~ t2e GO, 7776 ~ 48 ~ ~i ~o W 185~ 10885t
8233 IO,, 15' 8104 00 40~-i N 79° W 198 M II4T 81'
832O lOO 15' 81~ 61 1548 N 75,, e 202 M 11t2. /6
,~ ~ 30' 8399 ~ 20 ~ ri 73° #' .~12 ~ ,~ ~
8613 '9o 30' 8478 53 13 20 N 73o W .216 t9 ~ 49
8810 9~' 15· ~f:,72 97 31 66 iq 't'1- U ~ ~9- - ~ 42
9120 ~ 00' .~ 15 23. "74°· ~ ~ ' 121~,04 '.
q277.... ! 8,:, 450 9134 33 23~ 08 N 'i~o # ~ 'i4 · ." 1306
9449 "~ 70. 45, 9304 76 23 20 N 65~ · ~56 94 "~ . ~ 78
96~ 8°45' ~ 35 :Mg~ N64°#. ~t:) 67' .-. :~~
~ 8" 15' 9839 56 27 84 N ~-# 2~ ~ 1401
8°00' 99~0 68 12S3 N56o# 30~ " 141147
_1o~35_ 6° co, ~ ~ 4 7o N ~0 u 313~ 1424
10~4~ 8,' 0001~1~: aT: 1567 N 51° # ~ 57 143707
10,424 8o IS' ,1~~' 8') 1076 N 47° ti 33091 ": 144494
10~13 8" 15''"L,'~_t ~ 1316 N ~ # 33~~ " ~ 67
10;661 7° 45' 10'_~14_' 56 1996 ri 51° II 35211 147039
!%782 &.o 30' 10~__4_79 1370 N 51o · 36073 1481 03
10;962 6° 15' 10~03 73 19 60 N 40° If 375 74 1493 63
, .,.
.,
DRILLING CONTROL CORP.
SURVEY DATA SHEET
COMPANY FJo~,-~ d%,i~ ~Jmet~m~,
WELL . '~I~IEI~ ~l FIELD
SHEET NO. 4
DATE _J~_t_~ ~ JOB NO
aiEll'"'kik COUNTY., STATE,
TRUE RECTANGULAR COORDINATES
MEASURED DRIFT' DEVIATION DRIFT
VERTICAL , , REMA~
DEPTH ANGLE , COURSE DIRECTION
.DEPTH 'NORTH' ' I SOUTH . EAST WEST
I.I~IL3 6- IS, 10~ 84 1644 iq 36, ~ ~9 ~
60 oo, 33 9 ,, . ,fso u 4o8 tv
11~460 5° 15' 11~298 97 ? 78 N 40- If 41.4 88 1520 17
i1.~585 4o SO' 11~423 58 9 81.. Iq 3~o U 422~1 LS~ 79
,~,
I1~730 3o 00' . 11.~ 38 ? .59 N 4~o ti 4~J ~1' ' IS~ ~9 . '~":'~"
11~950 20 00' I/~';M 25 t' :68 lq 50' U 433 ~5 . ..'.:'.. 154517
12,130 t· 45' ,: l/~gll~ 16, 5 49 lq ~ u 436 88 , ,:,, 1549
12.375 2- oo,." "'D.~I3 "':
Ol 8~5 N40ee 44343 " LSS4~
2° 30' · 12~ ~ 12 65 . N 45°tf 452 Ii8 'i.: IS~ 82
, ,;-.'~..
12~795 1· 45* 12~32 66 397 iq 450 W' 455 t'; :~..' 156663
12~895 1o 30' '12s732 63 2 &?. N 40* W 457 W )56~~2 ' '.
12.~%~0 20 oo. ~,~m' 17 L~ '~ N lS', , 30 1576.6~
1o 45' 13~527 11 3 66 N 10o U 404 tO 1577 28
·
13~930 20 00'" 13~766 91' 8 38 N GBotf 492 E 1578
14~(]BO Ie 45e ~ 1 .3rSBB_ 91 3 66 N 25° 1l 495 I'1' 1579 56
14~100 1o 30* 13~9'ua6 89 I 31 N ,fOe Jr 496rS ~ 40
14~41o 1· 30' '14j~16 82 2 36 N 50' 11 ~ ¼ L584%
14,45o 1o ~ _1~ 81 o~87 r N 35e U ISIB~ ~ ~ 46
14~)80 Ie30' 14s416 1'7 3 41 N 35° 1l 5qJB~ 158742
14~T'J'5 1' O0t 14~61! 74 :341 lq 45° I 508 16 LS~ 83
14,830 0°45' 14,66~ 74 0'72 .N 6~', 50646 159046
14~940 Oe 45'14~776 73 I 44, S 85· If 50633 1591
CIOSIIE 16'/0 gA' lq 12o I~' #
(Feb.
.'. ; I (SUBM~ IN TRIPLICATE,)
I
I
STATES
[ ~ ~ ~ .... I · u~ ~~~ENT OF THE INTERIOR
............ ~--- ,'--
~ ~ ~ ~ J .... ~ o~ ~'"~?~~O~CA~SUeWY
I ...........
Budget Bureau No. 42-R358.4.
Approval expires 12-31-60.
[.and O~ce ...........................
............................
Surface location-Patented Ld
BHL-ADL 00592
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO DRILL ........................... ' .....
NOTICE OF INTENTION TO CHANGE PLANS ......... J .............
NOTICE OF INTENTION TO TEST WATER SHUT-OFF ..............
NOTICE OF .INTENTION TO RE-DRILL OR REPAIR WELL .........
NOTICE OF INTENTION TO SHOOT OR ACIDIZE ..................
NOTICE OF INTENTION TO PULL OR ALTER CASING ..............
NOTICE OF INTENTION TO ABANDON WELL ...... ~ ...............
......................................................................
SUBSEQUENT REPORT OF WATER SHUT-OFF ....................... I .....
SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING ................ I .....
SUBSEQUENT REPORT OF ALTERING CASING ....................... I .....
SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR ................ I .....
SUBSEQUENT REPORT OF ABANDONMENT .......................... /--,~-
SUPPLEMENTARY WELL HISTORY ................................... /
(INDICATE ABOVE BY'cHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA)
.......... _.D__~_c__e___m__b..e_r__ 3 ........................................ 19_6_7,_
Nir, ilchik ~i r~l
Well No. _.~i .........is located 1-43.~_ ft. from__ ne and 1_489___ ft. fro ine of sec ...... 6 .....
~___I_/__4_,8__E__I_Z_4_S___e:~_.___~__ 1 S 13 W Seward
'(~ sea. ~na soc. ~o.) ..... -(-~¥~f ............ -(h~ ................ ~-;r'lh]~l;f .......
Nini!chLk Area'Wildcat Homer Distr/ct ......... ___~_..a_.s_.k__.a. .....................
.................. {~-i~ ................... (County or Subdivision) (State or Territory)
The elevation of the derrick floor above sea level is 1_62~5 k. DETAILS OF WORK
(State names of and expected depths to objective sands~ show sizes, welghts~and lengths of proposed casings; indicate mudding jobs, cement-
ing points, and all other important proposal work)
Status of hole; 14,-940~otal depth
20'" pipe cemented
13-3/8" suP/ace casing cemented 2046~
9-5/8" cas/ng cemented
Plugs at 12 ,700-600 w/45 sax premxd 254~ HR4
i0,450-3-50 w/45 sa× premxd 25~f HR4 No commercial occurrences of o/1 or
7450-7400 w/50 sa× gas encountered.
Baker Model C cast iron.bridge plug 3890'
3812-3718 w/36 sa×
SuP/ace plugged w/10 sax
Welded steel plate on surface casing.
I understand that this plan of work must receive approval in writing by the (~eologlcal Eurvey before operations may be commenced.
Erected steel pipe well marker.
Abandoned well 4:00PM, Dec. 1,1962
Company __'iI_n.ton_Oit_,Oo_.__o:E_Calif..._,--Op-er ..................................................................................
2__-US~LA~_2c_~.,/; 1-Div' M &M, Anch, - 1-ROOO,Anch
1 - M aratbon,-_I2~__l----:-Marathon-~--Anch--,.---- Title ..... Dls_tr:tcJ;_M~sag_e~: .....................
1-SOCO, Anch, 1-Halbouty, Houston, 1 - File s,,o ss,o,o
Fox"]~ 9-~1a
(Feb. 1951)
! .
i I I
I I
I I
I I I
I I
! I
I I i
I !
Budge~ Bureau No. 42-1~4~8.4.
Approval expires 12-31-60.
Land Ol~ce ...........................
Lea.e No .............................
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO CHANGE PLANS ......... - ................... l SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING ................ I .....
NOTICE OF INTENTION TO TEST WATER SNOT-OFF .................... I SUBSEQUENT REPORT OF ALTERING CASING ....................... I .....
NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL ............... I SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR ................ I .....
NOTICE OF INTENTION TO SHOOT OR ACIDIZE ........................ IISUBSEQUENT REPORT OF ABANDONMENT .......................... I .....
NOTICE OF' INTENTION TO PULL OR ALTER CASING .................... II SUPPLEMENTARY WELL HISTORY ................................... I .....
(INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA)
_ from_:~ine and 1_4~0__ ft. from~ine of sec .... ~ ......
Well No ....... ~ .......is located 1~.'/'- ft.
.... ................ ........... .........
Cig See. an~l I~c. Ho.) (TWp.) (Range)
~~ ............. (County ~ ................. (State or Territory)
The elevation of the derrick floor above sea level is _1:~i11~$_ ft.
DETAILS OF WORK
(State names of and expected depths to objective sandsl show sizes, weights~and lengths of proposed casingsl indiceto muddinl jobs, cement-
ing points, and all other important proposed work)
~~thls plan of work must reces app' l writing Dy ~ O~ .; y operations may be commenced.
-~-.~ ~: Budget Bureau No. 42-R35§.5.
~ Approv~ ~pi~ 1~31~.
,~~~- _ UNITED STATES ., ~v OFFICE ......................................
~;~ ~ ~ --~%~&~ ~ . DEPARTMENT OF THE INTERIOR L~E .U~BE. ....................................
. GEOLOGICAL SURVEY ~m~_~ ............... .
B~~L 00592
~?~~SEE'S MONTHLY REPORT OF OPERATIONS
o~ o~
~ a .................................... N~c~ ~ - Wfld~t
T~e followi~ is a correct report of operations a~d prod~ctio~ (i~cl~di~ drilli~ a~d prod~ci~
~ fo~ ~ ~o~ of _~~__~_~~9_k~, _ ...........................................................................
J~e~'s address ~8.0~ ~ ~ ..... Corn a~ U~n:~__~/[.~ ~, ~ ~ff,
.............................................................. p Y ..............~ ..... ~ ........................... ~~_~
~o~ ...... ~~_w_~__~!~_~ ........................................... ~ee,~' ~ ~ ........ ~.~.~-~-~-~ ..............
GALLONS OF
SEC. AND BARREL8 OF OIL CU. FT. OF OAS OASOLINE
~/o~ ~4 (In thousands) RECOVERED
Sec. 6
674-10,
steel
~60it reC.
~So CUt
hole
open
-
~n
,600s-
O£o
Depth
45
tel0
hole
Guto
i
62
BABBles Or REMARKS
WA~ER (I~ (If drilltnL depth; If shut down,
no~o~ ~ s~te) ~ ~d r~t of ~t for ~o~o
'~t of ~)
h~ 10,55~10,674
~~ ~/2"
~ 12,S54 ~ 12
~~t ~~
45 ~~
~ ~t ~n
wi~ 29 sa~s
- 1/2" ~.s at 3765'
0~. Iet P~ 4
~'~ ~ d~ 4-1/2"
off or gas
~thon,
NoT~..--There were ........... ~_0 ..... ' ............ :___ runs or Ssles of off; .............. ._l~..~.~ ..................... M o.. ft. of gs..old;
.............. ~{)_ ......................... runs Or sales of gasoline during the month. (Write "no" where applicable.)
NoTE,--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in
dUPlicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor.
FOrm 9-329 16---25766-8 Uo So eOYS'RSMEST PRISTiNe OFFICE
(Feb. 1951)
'RECEIVED''
i i i ~I(~V 99 19§2 (svsz~rr
[ ...... [ ...... [ .... -'l UNITED STateS
~ I. I .... h'o[eum Branch
..... f ........ ~ ~.e~ o~d ~D[gART~ENT OF THE INTERIOR
~ , . fM .
Budge~ Bureau No. 42-R~8.4.
Approval expires 12-31-60.
Land Ot~ce ...........................
Unit ...................................
B~- ADL ~592
SUNDRY NOTICES AND REPORTS ON WELLS 2}'r.~s~ ~
~o~,~ 0~ ~0~ ~0 ~ w~ ~,u~. .............. I ...... il ~ou~ ~0~ 0~ ~,~ ~,~ ....................... I ...... ~/~
NOTICE OF INTENTION TO PULL OR AL~ C~ING .............. . I---II SUP~EMENTARY WELL HI~ORY .................................... f ..... ~ j
(INDICATE ABOVE BY CHECK MARK NATURE OF R~ORT. NOTICE, OR OTHER DATA)
.............. N~~_~_4_._ ................................. 19__6__2__
~! ......... is located ~!~:~:._~t. from__ ~ine and _!__4~__ ft. from ~ line of sec ..... _~
Well
No
:s~_~/{_~_!/{:s.~..__~ .l_l ........ : .... 1_3_~. ....... ~.e~.._ .............
'(~ See. an~ I~ec. No.) ..... -(~'wp.) (Range) (Meridian)
............. ......................... .............
The elevation of the derrick floor above sea level is _1__~_,}_ ft.
DETAILS OF WORK
(State names of and expected depths to objective sands; show sizes, weights~and lengths of proposed caslngsl indicate mudding jobs, cement-
ing points, and all other important proposed work)
~ ~¢o~-. 23, t0~-~ ~ De.:~ 14,940. 1~~ S~berg~r logs, 9-5/807430'
3. ~ 50" cem~ ~ eemss ~ ~ ~-~/8" cestn~ at 7430" - plu~ 7400-7450',
I understand that this plan of work must receive approval in writing by the Geological Survey before operations may be commenced.
Title
........ Di,s~ Mariaga{ .................
GPO BB~040
,-~'" .- '""-' Budget Bureau No. 42--R356.5.
~ Approval expires 1~31~.
UNITED STATES ~.~ omc~ ..................................
DEPARTMENT OF THE INTERIOR L~ Nurses ...................................
GEOLOGICAL SURVEY UmT ..............................................
~. ~c. Paten~ ~nd
°'"
T~, followi~ is a coffee* r,por~ of operaHo~s a~d prod~c*io~ (i~cl~d~ drilli~ a~d produci~
wells) for t~e mont~ of ___~~ ......................... 19~._, _ ...........................................................................
~o~ ......... ~~~_~g_~'~_ ........................................ ~t'~ ut~ ...... ~lz.~_M~m~
SEC. AND
~o~
Sec. 6
I
BABREI~ OF OIL [ (]RAVITY
11,5~4flI ,[
hole ail 3,2
Cu. FT. oP GAS
(In thousands)
~jer el®ca
10,674'.
8'1/2" ho
a 8~~b~
54-12,874
~1.
GAI~ONS O~'
GASOLINE
~REcOVERED
logs
lo,70
rOcov!
Petr(
Division o{
~[asko Dept.
BAITERnq OF
Wi~.a (If
none, So state)
0 10,661
91 10,6
L-11,574
,~c 1Og~
~reci 20~.
REMARKS
(I! drilling, dePth; ff .hu~ down, oame;
date and resUlt of test for gasoline
content o! ~a~)
~urc~
No ~ None
No?~.~There were .......... : ........................... runS or sales of oil; .............................................. M au. ft. of gas sold;
........ ,.~ ............................. runs or sales of gasoline during the month. (Write "no" where applicable.)
No~.--Repor~ on this form-is required for each calendar month, regardless of the status of operations, and must be filed in
duplicate with the supervisor by the 6th of the suooeeding month, unless otherwise directed by the supervisor.
galluary 1950)
Petroleum Branch
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
A Budget Bureau No. 42-R350.~
Approval expires 12-31-60.
I~ND OFFICE ..................................
LE/~£ NUMSER ................................
UNIT ...........................................
Divi:i°n of Mines an :: ,~4inerals ~'~ ~ ~0~
~m ~,.o~ No,~a, ~~SE£'S MONTHLY REPORT OF OPERATIONS
The followin~ is a correct report of operations and production
wells) for tI~e mo~tk of ......... ~~. .................... , 19.~ ..............................................................................
J~e~t's address ~_~~ ............................. Company
.___, ....... , ............ ~~..~~ ............................... s~,~ ...... ~~ .....~. ..... ~ ..............
SEC. AND
~ or ]4 Twr. RANGE WE~L CU. F~. Or GAS GALLONS O~ BARRELS O~ REMARKS
No. [Pao~vcn~ BA~RE~ OF O~ GRA~TY (~ tho~&) GASOL~E WATER (~ (lf:~lH~, depth; If shut down, ~;
~VERED ~0~0, 80 Stat0) date ~d r~ult of ~t for
No~..--Thero were _,___,~ ........................... runs or sales of off; ....... ~ ............................ M cu. ft. of gas sold;
.............................. ~ ......... runs or sales of gasoline-during the month. (Write "no" where applicable.)
No~r..--Report on ~'~ form is required for each calendar month, regardless of the status of operations, and must be filed in
duplicate with the supervisor by the 6th of the succeeding mOnth, unless otherwise directed by the supervisor.
(JanUary 1950) 16--=25766--8 Uo S. GOVERNMENT PRINTING OFFIOIt
Budget Bureau No. 42-R356Jl.
Approval expires 12-31-60.
UNITED STATES
DEPARTMENT OF THE INTERIOR L~E .UM.E. ..................................
UNIT ........................... ' .................
GEOLOGICAL SURVEY
BHL ADL 00SO2
LESSEE'S MONTHLY REPORT OF OPERATIONS
Tl, e followir~ is a correct report of operatior~s and prodtzctior~ (incl~,dir~ff drillir~t~ and prodz~cir~.
wells)/'or t]ze rr~or~tl, of ..... ~[~ ........................ 19.$2 .................................................................................
.4~e.r~t' s address ........
................................. ........................ ....... ...................................
PI~oz~e ..... :~/~13~W_~__~181 ................ : .......................... ./f~e~t' s title .,D~,a~,.~..~l~l~l~ ....................
SEC. AND
$~v ]./4
~ i/~
1 - Div-
_ File
BARREIS OF OIL
7037'. a
1
OlJ. F?. OF GAS
GRAVI~ (In thousands)
~e ~ lO-S/e-
(~ALLON8 OF
GASOLINE
RECOVERED
]~ARRELS O;
W~.a (If
none, so state)
751
'RECEIVED'
pe~l~u~ 'l~ronch
)ivlsion o~ M~nes and
aska Dept. o~ Natural Res
REMARKS
(If drilling, del)th; if shut down,
ds~e and result of t~st for r~solJne
oontent o!
Sot whipstock ~ at
3013'. ~ :1,2-1/
I7'. ~ 8~b~er
tt 8007'.
rals
No?~..--There were .............. '_N~ ................runs or sales of oil; ........... ~][~1~[ ....................... M cu. ft. of gas sold;
........... ,J~ ........................... runs or sales of gasoline during the month. (Write "no" where ~pplie~ble.)
No~-,--Report on this form is requ~ed for each calendar month, regardless of the status of operations, 8nd must bo filed in
duplicate with the supervisor by the Otb of the succeeding month, unless otherwise directed by the supervisor.
I~OI'ZiG. 9-329 16--.2~706-8 ti. S. OOVERNMI~NY PRIHTINa OFF'iCI
(,Ta~uary ~9~)
Budget Bm'emu No. 42-R358.4.
Form Approved.
L~nd Of~e ...........................
~ No. ...........................
Unit .................................
8urfaoe Loo~ Pa~ Land
ali~' ADL-OOSO2
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO DRILL ................................. [ ...... SUBS~QUENT REPORT OF WATER SHUT,OFF ............................
NOTICE OF INTENTION TO CHANGE.PLANS ....................... I ...... SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING ................ I .....
NOTICE OF INTENTION TO TEST WATER SHUT,OFF .............. J ...... SUBSE(HJENT REPORT OF ALTERING CASING ....................... t .....
NOTICE OF INT~TION TO RE-DRILL OR REPAIR WELL ......... I ...... SUBSEQUENT REPORT OF RE-DRILLING OR REPAIR ................ J .....
NOTICE OF INTENTION TO SHOOT OR ACIDIZE .................. I ...... SUBSEQUENT REPORT OF ABANDONMENT .......................... / .....
NOTICE OF INTENTION TO PULL OR ALl'ER CASING ............ :-/ ...... SUPPLEMENTARY WELL HISTORY ................................... I-----*
NOTICE OF INTENTION TO ABANDON WELL ...................... I~ ..... -~O,.~[~-~.~_~[~1~_ .......................................................................... ................ ~__,
(INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA)
Wel~,No ................... is-1~6~ t.~ __['~_..~?~. from.~ IMe and 14Sa.*. from ~ l~e of sec ..... S. .....
~ e. ~ .o. o.) '~' (T~.) (~e) ' - (~~ ..........
(Field)
(Oounty or Subdivision)
(State or Territory)
The elevation of the derrick floor above sea level is t4Z.4_ It. M~ Rich Tide
DETAILS OF WORK
(State names of and expected depths to objective sandsi show sizes, weights~end lengths of pr?~4)sed cioingm~ indlcita mudding jobs, cement-
ing points, end ell other important proposed work)
U~, ~', !~2~~~,,~/~ -, G. Sow, s, Ohio, LeA.,
Shoemaker, ~., I - ~, ~mn, 3- SO~, Anch.,
~~' ~., ~.,1 ' File
! understand that this plan of work must recedve approval in writing by tho Geological e.,urvey before operations may be commenced,
Address ......... Za0S_~_8%. ....................
Title ...... Dl~lrt~Y.~u~ez ................. '
GPO 9 1,4974
~ ~-~ Budget Bureau No. 42-R35~LS.
Approval expires 12-31-60.
UNITED STATES , .,,~D omcE .....................................
DEPARTMENT OF THE INTERIOR LEASE NOMBEa ................................
UNIT ............................................
GEOLOGICAL SURVEY ~, ~d]l~_~ ~ ~ ~
LESSEE'S MONTHLY REPORT OF OPE~'~~~
T]~e followi7~ is a correct report of operatioT~s aT~d prod~cti07~ (incl~diT~ drillir~g aT~d prodz~CiT~
wells) for t~e moT~t~ of ..... ~ .............................. 19-~1~, ............................................................................
./lee~t' s aadress ___~~~ ...........................
............................. ~i14~.:~ .......................... s~o~e~ ........... :--/~;~-~--~ ..................... ' ........
P l~o T~e .... ~-~~ ............................................. ./Zff en, t s title .... ~t~r~ .................
- 'REMARKS
GALLONS 0~' BARRRLS 01~
OU. FT. OF GAS (H drilltaz, d~l~th;
AND NO. P~o, vc~ (~ tho~&) RECOVERED none, so state) da~ ~d r~t o[ ~t for g~lme
OF ~ ~P. RANGE WE~ DA~s B~R~ OF O~ GRA~TY GASOL~E WATER
~n~t
,.
,,,
,
Pet ch
DMsian =f.i Ml~s and ~inerah
~ D~ ~ Natural R~ur~
id
g
did
No?E.--There Were,__~ .... , .................... ._,_ runs or sales of oil; ......... ,~ .......................... M cu. ft. of gas sold;
,___, .......... runs or sales of gasoline during themonth. (Write "no" where applicable.)
Nd~.--Report on this form is required for each calendar mOnth, regardless of the status of operations, and must be filed in
duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor.
~'~):FI3:I. 9-~9 16---25766'~ U.S. GOYKUNMENT J=RISTI#O OlqqC"'
(~anuary ~9~0)
AL, in 9-881 a
(Feb. 1961)
''{I
I
I
.~ '~ ~ I
!
! ! ! I
(SUBMIT. IN TRIPLICATE)
UNITED STATES
DEPARTMIrNT OF THE !NTERIOR
GEOLOGICAL SURVEY
.Budget Bureau No. 42-R358.4.
Form Approved.
Land Oflico ...........................
fJurfm~ L0zt }atentod ~
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO CHANGE.PLANS ....................... I ...... Il SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING ................ { .....
.............. I ...... ....................... t ......
.o~,~ o~,.~.~,o. ~o.~ o...~,.~ ................. I ...... II .o~.~ ~. o~ ~.~...~ .......................... / ......
.o~. o~,.~.~,o. ~o ~ o. ~ ~,.~ .............. I ...... I1'~"~*"~ ~""~°"~ ................................... I- .....
NOTICE OF INTE~iON TO ~N~N W~ ...................... I .... ~-II ........................................................................ I- .....
J~~_~_~ ............ : .......................... __lx__ll ........................................................................ I_ .....
,
(INDICATE A~VE BY CHECK MARK NACRE OF R~ORT, NOTI~ OR 0~ DATA)
Well No ................... is located ___~___ ft. from__~ine and _X._~___ ft. from ~e of sec ..... .~i .....
__~ _~ _:~_:~__~ ,__.~ ____~_ ~ ............. !~__~. ~ .............. ~_.~ ............
04 See. aaa Sec. Bio.) (?wp.) (Range) (Meridian)
~_~ ...................~_?ms~ ................................. ~~; ..............
(Field) (CoUnty o~ ubdiviston)
The elevation of the derrick floor above sea level is ]Jl$_ .... ft.
O~T^~LS o~ WOaZ
(Stats names of and expected depths to objective oandst show sizes, weifhtszand lenfths o~ propoood, carings; indimmto muddln~ jobs, cernont-
. lng points, and all other important propoood work)
JUL'~4 l~
inetml~m Bvaflch
D!v?on of Mines and Minerals
, .... ..- . . /
- ~, ~., I - ~,~~, ,tbm.~¥, I - Gl.
! understand that this plan of work must receive approval in wrltinf I~ tho Goololtc~ ~urvsy boforo operatiom me), be commenced.
Company --~~-OtlL~--O~-~.-O~iiII~ .................................................................
Address .... ~_~_~ ..................
GPO 914974
STATE OF ALASKA
DIWI$ION OF MINES 6; MIArEP~AL~
AN~HDRAGE,
mil
APPLICATION FO~-PERMIT TO DRILL, DEEPEN OR PLUG BACK
.:'~-:~ -_- ' AP~I~ICATION.~O DRILL:~ · I~.Et~PEN [] PLUG BACK ~
Address ~- ....... ......... . .... ~ ...... ,~'- .......... ~f ~..~ ~.' .... ; ~---~ -' ~ ~'~' .: ~- -' City '-; '~ State
Name of lease ' ' ' t~lVeH n~mbe~ ~.~ ~ Elevation (ground)
, ~ ,,~ , ,
~rell location (~Jve fooL~ f~om s~etton lines) See~Jon~Lownship~n~e' ~'~1~'~-~
"' -- - = ........ .,., ..... . -._ ............ ~ _
Distance, in miles,, and direction from nearest town~r post O~tee
Nearest dis~n~e from propoCed !oeatiOn'' . ;' ................. [ Distance from proposed loe~tton to nearest drilling,
to propertyOr ,e~s~r l~ "~ : ' , '~' completed or ~pplied.fo. well o. the same
~,' . .... . feet [ ~~ ~ ~ .feet
wells drilled, froTM whom purchased': ~: - -~-~_ :~ : : :. ...... . -
-. Ala~ Dopt, of Natural Resour~
I producing- Zone and expected' ~ew pr6ducing zone)
--Permit Number:
Approval Date:
Approved By: ~ -~.
Notice: Before sending in this form'be sure that Y~u have given
all information requested. Much unnecessak~ correspond-
ence will thus be avoided.
See Instruction on Reverse Side of Form
y ~ am authorized by said company to make this report; and that this report was pre-
pared under my supervision and direction and that the facts stated.~rein ar~ true, correct and complete to
the best of my knowledge.
Signatur~ -- ' '
Alaska Oil and Gas Conservation Commission
Application to Drffi, Deepen or Plug Back
Form No, P-1
Authorized by Order No. 1
Effective October 1, 1958
INSTRUCTIONS
READ CAREFULLY AND COMPLY FULLY
For the purpose of this determination attach hereto a neat, accurate plat, map or sketch of this lease, section, block
or lot locating thereon the proposed site for this location. Plat shall be drawn to a scale which will permit the facile
observation of all pertinent data. Show distances of the proposed well from the two nearest lease and section lines, and
from the nearest wells on the same lease completed in or drilling to the same reservoir. I.f the location requested is not in
conformance with the applicable well.spacing rules, show all off-setting wells to the proposed well, and the names and
addresses o£~all, adjoining lease or property owners.
In event plat is filed for the PurPose of designating the drilling and producing unit, or proration unit, on which the
proposed well is to be drilled, the boundaries of such unit shall be shown, also the boundaries of ail other such units
attributed to other wells on the same lease completed in or drilling to the same reservoir. The acreage contained within
each unit shall also be shown.
Do not confuse survey lines with lease lines. The sketch or plat should show your entire lease if possible. If it is
.,
not practical to show the entire lease and the plat shows only a section, block or lot out of your lease, you should clearly
show tha~ same is only a part of the .lease.
Designate scale to which plat or sketch is drawn. Also designate northerly direction on the sketch or plat.
6.'~, .~~n ts 3SO* nm~ and 3000* west of the m2rfaoe loca~n.
7. ~ w~~, ~ ~~'" ~ ~ ~ ~ a~a~ ~, ~st ~ ~~e~.
,.
NO2'F4 If hole condttlon we~rants,-will r~ end cemont 9.,-.%/'8" casing at 8000_+,
.
..
-.
,.
.-