Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout167-002STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS NOV 082019 1. Operations Abandon LJ Plug Perforations LJ Fracture Stimulate Pull Tubing LJ dplAbAublou Performed: Suspend ❑ Perforate ❑✓ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska, LLC Development Q Exploratory ❑ 167-002 3. Address: 3800 Centerpoint Drive, Suite 1400 Stratigraphic ❑ Service ❑ 6. API Number: Anchorage, AK 99503 50-733-20001-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0018731 Trading Bay St A-04 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Trading Bay Field / Middle Kenai B, Middle Kenai C & Undefined Oil Pools 11. Present Well Condition Summary: Total Depth measured 10,609 feet Plugs measured 1,820 & 3,360 feet true vertical 10,491 feet Junk measured 3,306 feet Effective Depth measured 1,810 feet Packer measured See Schematic feet true vertical 1,790 feet true vertical See Schematic feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 1,075' 3,090 psi 1,540 psi Intermediate Production 6,370' 9-5/8" 6,370' 6,281' 3,950 psi 2,570 psi Liner Perforation depth Measured depth 1,568 - 1,800 feet True Vertical depth 1,553 - 1,780 feet 3-1/2" 9.2 / L-80 1,535 (MD) 1,521 (TVD) Tubing (size, grade, measured and true vertical depth) 2-7/8" 6.4 / N-80 2,597 (MD) 2,553 (TVD) 310 (MD) Packers and SSSV (type, measured and true vertical depth) Packers (x3) See Schematic Baker TE -5 SSSV 310 (TVD) 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 46 0 80 83 Subsequent to operation: 016 0 1 90 74 14. Attachments (required Per20AAC 25.070, 25.071, & 25.283) 15. Well Class after work: Daily Report of Well Operations ❑' Exploratory ❑ Development❑ Service ❑ Stratigmphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-460 Authorized Name: Stan W. Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager0 Contact Email: dmartoweCoiihilcom cora Authorized Signature: �'�+. LJ r t 7 Date: (r} Contact Phone: (907) 283-1329 Form 10-404 Revised 4/2017 3BDMS±O� NOV 13 2019 /i -Z S --raj x 1pj�f Submit Original Only RKB to TBG Hngr= 41.20' Tree connection: 3" 5,0004 11 ILIT-1- 2 3 4 5 s 1,561'-f,610' 164"42' 1668'-1688' 1,74P-1 800' TOC 1,810' 1820'-022' W132104'-2160' 2176'-2204' 2285-2370' 8 9 10 2596' 2 !!! 13437' 6' 0' KB ELEV = 101' TD = 10609' PBTD = 1,810' MAX ANGLE thru INTERVAL = 15.45° SCHEMATIC Trading Bay Unit Well # A-4 Completed: 11/18/15 CASING AND TUBING DETAIL SIZE WT Grade Conn. ID To tin. 13-3/8" 61.0 K-55 Butt. LT&C 12.515 Surf 1077 9-5/8"1 40# & 43.5 1 1-55 & N-RO I Rutt R 9ct c.,.6 c1x�ry JEWELRY DETAIL NO. Death Depth ID Item (MD) (TVD) 41.20 41.20 Hanger 1 310' ME 2.813 SSSV-Baker TE -5 2 1,014' 1,012' 2.992 GLM 3 1,488' 1,475' 2.992 Chemical Injection Mandrel 4 !!! 13437' 6' 0' KB ELEV = 101' TD = 10609' PBTD = 1,810' MAX ANGLE thru INTERVAL = 15.45° SCHEMATIC Trading Bay Unit Well # A-4 Completed: 11/18/15 CASING AND TUBING DETAIL SIZE WT Grade Conn. ID To tin. 13-3/8" 61.0 K-55 Butt. LT&C 12.515 Surf 1077 9-5/8"1 40# & 43.5 1 1-55 & N-RO I Rutt R 9ct c.,.6 c1x�ry JEWELRY DETAIL NO. Death Depth ID Item (MD) (TVD) FISH: Drilled Mod "D" Pkr. 3/5/90 @ 3441' Drilled Retainer 3/8/90 @ 3306' FILL Tagged w/ 2.27 GR, sticky paraffin 8/31/2015 @ 1576' WLM 41.20 41.20 Hanger 1 310' 310' 2.813 SSSV-Baker TE -5 2 1,014' 1,012' 2.992 GLM 3 1,488' 1,475' 2.992 Chemical Injection Mandrel 4 1,506' 1,492' 4.000 Packer- 9-5/8" M Hydraulic Retrievable Packer 5 1,524' 1,510, 2.813 X -Nipple 6 1,535' 1,521' 2.992 WLEG 7 1,820' 1,800' 1,72V CIBP 8 2,532' 2,490' 2.313 Otis "XA" Sliding Slve 9 2,564' 2,521' 2.313 Otis "X" Profile Nipple 10 2,596' 2,552' 3.00 Baker "S-22" Locator Seal Assy. 190-47 11 2,596 2,552' 4.75 96A4-47 SC -1 Gravel Pack Packer 12 2,601' 2,557' 4.75 Model "S" GP Ext. w/ Sldg Slve w/ Lwr ext. 13 2,632' 2,587' 4.408 80.73' of 5" Blank Liner 14 2,712' 2,664' 4.408 14jts [447.9'] of Wire Wrap Screen, 0.012 gage 15 3,160' 3,098' 2.875 O-ring Seal Sub 16 3,161 3,099' 4.408 Lwr Tell Tail Screen. 17.61' 17 3,179' 3,117' 3.00 11 Snaplatch seal assy. 190-47 18 3,180' 1 3,118' 4.75 1 194-47 Model "D" Sump Pkr. FISH: Drilled Mod "D" Pkr. 3/5/90 @ 3441' Drilled Retainer 3/8/90 @ 3306' FILL Tagged w/ 2.27 GR, sticky paraffin 8/31/2015 @ 1576' WLM Updated: 11/06/19 by JLL Perforation Detail Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD) Amount SPF Date Present Condition AZN 23A 1,568' 1,610' 1,553' 1,594' 42' 6 1/2/2016 Open AZN 24A 1,668' 1,688' 1,651' 1,670' 20' 10/24/19 Open AZN 25A 1,740' 1,780' 1,72V 1,760' 40' 6 12/18/2015 Open AZN 25A 1,744' 1,800' 1,725' 1,780' S6' 11/18/2015 Open 31-8 2,752' 2,770' 2,702' 2,720' 18' 8 3/9/1990 Isolated 31-8 2,810' 2,830' 2,759' 2,778' 20' 8 3/9/1990 Isolated 33-6 2,897' 2,935' 2,843' 2,880' 38' 8 3/9/1990 Isolated 41-3 3,005' 31030' 2,948' 2,972' 25' 8 3/9/1990 Isolated 41-8 3,055' 3,150' 2,996' 3,089' 95' 8 3/9/1990 Isolated 24-A 1,660' 1,695' 1,643' 1,677' 35' 4 3/4/1990 Cmt Sgd 44-7 3,382' 3,404' 3,315' 3,336' 22' 4 3/4/1990 Cmti, d 24-6 2,104' 2,160' 2,078' 1,132' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 2,148' 2,175' 28' 2 9/27/1994 Isolated��l 26-7 2,285' 2,370' 2,253' 2,334' 85' 2 9/27/1994 Isolated Updated: 11/06/19 by JLL Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date Trading Bay State A-04 Eline 50-733-20001-00-00 167-002 10/24/19 1 10/24/19 Daily Operations: 10/24/19 - Thursday Mobe crew to Monopod & orientate same. R/U e-line. P/u tools CCI, GR & 2 3/8" guns loaded w/20' shots, 60deg phasing, 6 SPF. PT lubricator 250/1500 psi, good. RIH t/1763'. POOH logging up t/ 1488', send logs to town to correlate, made 3.5' adjustment, re-logged & sent to town to verify good. Put guns on depth and fire guns, good indication guns fired perforating (/1668'-1688'. POOH, all shots fired. Rig down e-line & prep unit for shipping to Steelhead. Move crews f/Monopod to Steelhead. THE STATE 01ALASKA GOVERNOR MIKE DUNLEAVY Stan W. Golis Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. a o g c c. a l a s k a. g o v Re: Trading Bay Field, Middle Kenai B, Middle Kenai C, and Undefined Oil Pools, Trading Bay St A-04 Permit to Drill Number: 167-002 Sundry Number: 319-460 Dear Mr. Golis: Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Jeremy Price Chair DATED this 1 day of October, 2019. RBDMS46�4ocr 10 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25 280 RECEIVED OCT 0 8 2019 AOGCC 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate Q Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory El Development Q. Stratigraphic ❑ Service ❑ 167-002 • 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-20001-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? CO 93B ' Will planned perforations require a spacing exception? Yes El No Q - Trading Bay St A-04 - 9. Property Designation (Lease. Number): 10. Field/Pool(s): ADL0018731 • I Trading Bay Field/ Middle Kenai B Oil, Middle Kenai C Oil & Undefined Oil Pools ' it. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10,609 • 10,491 1,810 1,790 395 psi 1,820 & 3,360 3,306 Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 1,075' 3,090 psi 1,540 psi Intermediate Production 6,370' 9-5/8" 6,370' 6,281' 13,950 psi 2,570 psi Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 1,568 - 1,800 11,553 - 1,780 3-1/2" & 2-7/8" 9.2 / L-80 & 6.4 / N-80 1,535 & 2,597 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): DLH Hyd Ret Pkr/Baker SC -1 Pkr/Baker Model D Pkr & Baker TE -5 SSSV 1,506' (MD) 1,492' (ND) / 2,596' (MD) 2,552' (ND) / 3,180' (MD) 3,118' (TVD) & 310' (MD) 310' (ND) 12. Attachments: Proposal Summary ❑' Wellbore schematic ✓ 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Strati ra hic g p ❑ Development ❑✓ Service ❑ 14. Estimated Date for 15. Well Status after proposed work: 10/28/2019 Operations: D. E]WDSPL EJ Suspended ElCommencing OIL WINJ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W. Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: drnarloweCciihilcorp.com \ Contact Phone: (907) 283-1329 t�...r c Authorized Signature: '� Date: t 8 11ci COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: RBDMS OCT 10 2019 Post Initial Injection MIT Req'd? Yes ❑ No Spacing Exception Required? Yes ❑ No Subsequent Form Required: /6 --L/01 d �►/�t�y/�► APPROVED BY •I O Approved by: 1 r ' COMMISSIONER THE COMMISSION Date: Form 10-44 1 Appr �tlapp�kation /rn I1nA ate of approval. Submit Form and Attachments in Duplicate ff l ik.q Alaska, LLC Well Work Prognosis Well Name: Monopod A-04 API Number: 50-733-20001-00 Current Status: Gas -Lifted Producer Leg: N/A Estimated Start Date: 10/28/2019 Rig: N/A Reg. Approval Req'd? 10-403 Date Reg. Approval Rec'vd: Regulatory Contact: Juanita Lovett 777-8332 Permit to Drill Number: 167-002 First Call Engineer: Dan Marlowe (907) 283-1329 (0) (907) 398-9904 (M) Second Call Engineer: Stan Golis (907) 777-8356 (0) (281) 450-3071 (M) Current Bottom Hole Pressure: 550 psi @ 1553' TVD 0.354 psi/ft (6.81 ppg) Maximum Expected BHP: 550 psi @ 1553' TVD 0.354 psi/ft (6.81 ppg) Maximum Potential Surface Pressure: 395 psi Using 0.1 psi/ft per 20 AAC 25.280(b)(4) Brief Well Summary A-04 is a gas lift assisted gas well re -completed in 2015. This project will perf the AZN 24A sand. ✓ E -line Procedure: 1. MIRU E -line, PT lubricator to 1,500 psi Hi 250 Low. 2. RU e -line guns and perforate with well flowing per program. 3. RD E -line. 4. Turn well over to production. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic RKB to TBG Hngr=41,20' Tree connection: 3" 5,000# KB ELEV = 101' TD = 10609' PBTD = 1,810' MAX ANGLE thru INTERVAL = 15.45° SCHEMATIC Trading Bay Unit Well # A-4 Completed: 11/18/15 SIZE CASING AND TUBING DETAIL WT Grade Conn ID Top Btm 13-3/8" 9-5/8" Tubin 61.0 K-55 Butt. LT&C 12.515 40# & 43.5 J-55 & N-80 Butt 8.681 Surf Surf 1077' 6370' 2 3-1/2" 9.2 L-80 SuperMax 3 Surf 1,535' Chemical Injection Mandrel 2-7/8" 6.4# N-80 Butt Packer -9-5/8" DLH Hydraulic Retrievable Packer 1,820' 1 2,597' 2.813 X -Nipple 6 1,535' JEWELRY DETAIL NO. Denth m Tto.., FISH: Drilled Mod "D" Pkr. 3/5/90 @ 3441' Drilled Retainer 3/8/90 @ 3306' FILL Tagged w/ 2.27 GR, sticky paraffin 8/31/2015 @ 1576' WLM 41.20 Hanger 1 310' 2.813 SSSV-Baker TE -5 2 1,014' 2.992 GLM 3 1,488' 2.992 Chemical Injection Mandrel 4 1,506' 4.000 Packer -9-5/8" DLH Hydraulic Retrievable Packer 5 1,524' 2.813 X -Nipple 6 1,535' 2.992 WLEG 7 1,820' CIBP 8 2,532' 2.313 1 Otis "XA" Sliding Sive 9 2,564' 2.313 Otis "X" Profile Nipple 10 2,596' 3.00 Baker "S-22" Locator Seal Assy. 190-47 11 2,596 4.75 96A4 -475C-1 Gravel Pack Packer 12 2,601' 4.75 Model "5" GP Ext. w/ Sldg Slve w/ Lwr ext. 13 2,632 4.408 80.73' of 5" Blank Liner 14 2,712' 4.408 14 jts [447.9'] of Wire Wrap Screen, 0.012 gage 15 3,160' 2.875 O-ring Seal Sub 16 3,161 4.408 Lwr Tell Tail Screen. 17.61' 17 3,179' 3.00 Snaplatch seal assy. 190-47 18 3,180' 4.75 1 194-47 Model "D" Sump Pkr. FISH: Drilled Mod "D" Pkr. 3/5/90 @ 3441' Drilled Retainer 3/8/90 @ 3306' FILL Tagged w/ 2.27 GR, sticky paraffin 8/31/2015 @ 1576' WLM Updated: 01/25/16 by JUL Perforation Detail Zone Top Btm Amount SPF Date Present Condition AZN 23A 1,568' • 1,610' 42' 6. 01/02/16 Open AZN 25A 1,740'. 1,780' 40' 6 12/18/15 Open AZN 25A 1,744' • 1,800' 56' 11/18/15 Open 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated 31-8 2,810' • 2,830' 20' 8 3/9/1990 Isolated 33-6 2,897' 2,935' 38' 8 3/9/1990 Isolated 41-3 3,005'. 3,030' 25' 8 3/9/1990 Isolated 41-8 3,055', 3,150' 95' 8 3/9/1990 Isolated 24-A 1,660' • 1,695' 35' 4 3/4/1990 Cmt Sgzd 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sgzd 24-6 2,104" 2,160' S6' 2' 9/27/1994 Isolated 24-6 2,176' ' 2,204' 28' 2 9/27/1994 Isolated 26-7 2,285' - 2,370' 85' 2 9/27/1994 Isolated Updated: 01/25/16 by JUL PROPOSED Trading Bay Unit Well # A-4 Completed: 11/18/15 RKB to Tec Hngr = 41.20' CASING AND TUBING DETAIL Tree connection: 3" 5,000# SIZE WT Grade Conn. ID To Mon. 1 18" 61.0 K-55 Butt. LT&C 12.515 Surf 1077' 9-5/8" 40# & 43.5 J-55 & N-80 Butt 8.681 Surf eR7n• 2104' 216U 2 41,20 3 310' 4 -5 x 5 Top (TVD) 1,012' 6 SPF Date Present Condition t 561'-1,610' 2.992ion Mandrel 1640'-642' W1,506' 1,492' 1fi68 �_1fi08' DLH Hydraulic Retrievable Packer Open 1,740'-1,80V 1820'-822- 020'-822' TOC 42104'-2160' 21]6'.2204' 2285-23]0' 2596' 17 3306' 3360' J"3437' KB ELEV = 101' TD = 10609' PBTD = 1,810' MAX ANGLE thru INTERVAL = 15.45° JEWELRY DETAIL NO. Depth Depth ID Item (NM) (TVD) FISH: Drilled Mod "D" Pkr. 3/5/90 @ 3441' Drilled Retainer 3/8/90 @ 3306' FILL Tagged w/ 2.27 GR, sticky paraffin 8/31/2015 @ 1576' WLM 41,20 Hanger 310' 2.813=Mandrel -5 Btm (MD) Top (TVD) 1,012' 2.992 SPF Date Present Condition 1,475' 2.992ion Mandrel 1,553' W1,506' 1,492' 4.000 DLH Hydraulic Retrievable Packer Open AZN 24A 1,510' 2.813 ±1,651' ±1,670' ±20' 1,521' 2.992 Proposed AZN 25A 1,740' 1,804 1,721' 40' 2,532 2,490' 2.313 Otis "XA" Sliding Slve 9 2,564' 2,521' 2.313 Otis "X" Profile Nipple 10 2,596' 2,552' 3.00 Baker "S-22" Locator Seal Assy. 190-47 11 2,5962,552' 2,720' 4.75 96A4-47 SC -1 Gravel Pack Packer 12 2,601' 2,557' 4.75 Model "S" GP Ext. w/Sldg Slve w/ Lwr ext. 13 2,632' 2,587' 4.408 80.73' of 5" Blank Liner 14 2,712' 2,664'4408 2,935' 14 its [447.9'] of Wire Wrap Screen, 0.012 gage 15 3,160' 3,098' 2.875 O-ring Seal Sub 16 3,161 3,099' 4.408 Lwr Tell Tail Screen. 17.61' 17 3,179' 3,117' 3.00 Snaplatch seal assy. 190-47 18 3,184 3,118' 4.75 194-47 Model "D" Sump Pkr. FISH: Drilled Mod "D" Pkr. 3/5/90 @ 3441' Drilled Retainer 3/8/90 @ 3306' FILL Tagged w/ 2.27 GR, sticky paraffin 8/31/2015 @ 1576' WLM Updated: 07/23/19 by JLL Perforation Detail Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD) Amount SPF Date Present Condition AZN 23A 1,568' 1,610 1,553' 1,594 42' 6 1/2/2016 Open AZN 24A ±1,668' ±1,688' ±1,651' ±1,670' ±20' Future Proposed AZN 25A 1,740' 1,780' 1,721' 1,760' 40' 6 12/18/2015 Open AZN 25A 1,744' 1,800' 1,725' 1,780' 56' 11/18/2015 Open 31-8 2,752' 2,770 2,702 2,720' 18' 8 3/9/1990 Isolated 31-8 2,810' 2,830' 2,759' 2,778' 20' 8 3/9/1990 Isolated 33-6 2,897' 2,935' 2,843' 2,880' 38' 8 3/9/1990 Isolated 41-3 3,005' 3,030' 2,948' 2,972' 25' 8 3/9/1990 Isolated 41-8 3,055' 3,150' 2,996' 3,089' 95' 8 3/9/1990 Isolated 24-A 1,660' 1,695' 1,643' 1,677' 35' 4 3/4/1990 Cmt Sgzd 44-7 3,382' 3,404' 3,315' 3,336' 22' 4 3/4/1990 Cmt Sgzd 24-6 2,104' 2,160' 2,078' 2,132' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 2,148' 2,175' 28' 2 9/27/1994 Isolated 26-7 2,285' 2,370' 2,253' 2,334' 85' 2 9/27/1994 Isolated Updated: 07/23/19 by JLL STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMMON REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Pull Tubing❑ Operations shutdown ❑ Performed: Suspend ❑ Perforate El Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other: ❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska,LLC Development 0 Exploratory LI 167-002 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99503 50-733-20001-00 RECEIVED 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0018731 Trading Bay St A-04 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A Trading Bay Field/Undefined Oil Pool JAN 2 5 2016 11.Present Well Condition Summary: C AOGC Total Depth measured 10,609 feet Plugs measured 1,820&3,360 feet true vertical 10,491 feet Junk measured 3,306 feet Effective Depth measured 1,810 feet Packer measured 1,506,2,596,3,180 feet true vertical 1,790 feet true vertical 1,492,2,552,3,118 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 1,075' 3,090 psi 1,540 psi Intermediate Production 6,370' 9-5/8" 6,370' 6,281' 3,950 psi 2,570 psi Liner Perforation depth Measured depth 1,568-1,800 feetsaNike True Vertical depth 1,553-1,780 feet 3-1/2" 9.2#/L-80 1,535'(MD) 1,521'(TVD) Tubing(size,grade,measured and true vertical depth) 2-7/8" 6.4#/N-80 2,597'(MD) 2,553'(TVD) DLH Hyd Ret Pkr 1,506'(MD)1,492'(ND) Packers and SSSV(type,measured and true vertical depth) Baker SC-1 Pkr 2,596'(MD)2,552'(ND) Baker Model D Pkr 3,180'(MD)3,118'(ND) Baker TE-5 SSSV 310'(MD)310'(ND) 12.Stimulation or cement squeeze summary: Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 768 15 100 99 Subsequent to operation: 0 78 0 191 76 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations CI Exploratory❑ Development ID Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Ef Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-729 Contact Trudi Hallett(907)777-8323 Email thallett@hilcorp.com Printed Name Stan W.Golis Title Operations Manager Signature WttrkfAPhone (907)777-8356 Date /i_ - /t b /_2 —1 4 RRDMS LL JAN 2 6 2016 Form 10-404 Revised 5/2015 Submit Original Only 0 SCHEMATIC • Trading Bay Unit Well #A-4 Completed: 11/18/15 RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 1 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' 9-5/8" 40#&43.5 J-55&N-80 Butt 8.681 Surf 6370' Tubing: A am' 2 \ 3-1/2" 9.2 L-80 SuperMax Surf 1,535' 2-7/8" 6.4# N-80 Butt 1,820' 2,597' 3 4 1E1_ 15 JEWELRY DETAIL =- 6 NO. Depth ID Item 1,581'-1,610 41.20 Hanger 1640•-642• 1 310' 2.813 SSSV-Baker TE-5 Sgze Petra 1660'-1695' Press tested to SOOpsi, 2 1,014' 2.992 GLM on 3/18/90 3 1,488' 2.992 Chemical Injection Mandrel E. 1,74o'-1,800 1/" 4 1,506' 4.000 Packer-9-5/8"DLH Hydraulic Retrievable Packer 1820'-822' Ti,a1o• L 5 1,524' 2.813 X-Nipple 7 6 1,535' 2.992 WLEG 7 1,820' CIBP 8 2,532' 2.313 Otis"XA"Sliding Slve 2104'-2160' 9 2,564' 2.313 Otis"X"Profile Nipple = z,7s-zzoa' 10 2,596' 3.00 Baker"S-22"Locator Seal Assy.190-47 11 2,596 4.75 96A4-47 SC-1 Gravel Pack Packer 2285'-2370' 12 2,601' 4.75 Model"S"GP Ext.w/Sldg Slve w/Lwr ext. o 18 - 13 2,632 4.408 80.73'of 5"Blank Liner • • 9 14 2,712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3,160' 2.875 0-ring Seal Sub 112596' 16 3,161 4.408 Lwr Tell Tail Screen.17.61' 0 12 17 3,179' 3.00 Snaplatch seal assy.190-47 18 3,180' 4.75 194-47 Model"D"Sump Pkr. L 13 • 2752•-2770' FISH: - =2810•-2830' Drilled Mod"0"Pkr. 3/5/90 @ 3441' =289x•-2935' Drilled Retainer 3/8/90 @ 3306' 14 3005'-3030' FILL 3109'-3150' L 15 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM 16 17 Perforation Detail 18 E° 3180' Zone Top Btm Amount SPF Date Present Condition AZN 23A 1,568' 1,610' 42' 6 01/02/16 Open AZN 25A 1,740' 1,780' 40' 6 12/18/15 Open 1.... 3306' AZN 25A 1,744' 1,800' 56' 11/18/15 Open 3360' 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated 1 31-8 2,810' 2,830' 20' 8 3/9/1990 Isolated 3437' 33-6 _ 2,897' 2,935' 38' 8 3/9/1990 Isolated \ 41-3 3,005' 3,030' 25' 8 3/9/1990 Isolated KB ELEV=101' 41-8 3,055' 3,150' 95' 8 3/9/1990 Isolated TD=10609' PBTD=1,810' 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd MAX ANGLE thru INTERVAL=15.45° 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 28' 2 9/27/1994 Isolated 26-7 , 2,285' 2,370' 85' 2 9/27/1994 Isolated Updated: 01/25/16 by.ILL •• 113- Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 E-Line 50-733-20001-00 167-002 12/18/15 1/2/16 Daily Operations: 12/18/2015- Friday PJSM, spot eq. & re-head, r/u lub, p/u GR/CCL& 20' 2 1/2" guns, P/T lubricator t/500/2500 good, rih t/tag @ 1781', POOH,L/D e-line while waiting for w/I hand to arrive on boat, R/U w/I 2 1/4" pump bailer, RIH tag @ 1781', wk bailer, POOH, recover fluid, small pieces cmt, and small amount of sand. M/u 2 1/2" drive down bailer, t/1781', wk bailer making no headway, POOH, recover fluid w/small amount of sand. RD w/l, R/U e-line, rih w/GR/CCL& 20' of 2 1/2", 60 deg phasing, 6 spf, guns,t/tag @ 1781', run correlation log, send log to town t/verify,good, fire guns w/top shot @ 1759.5', btm shot @ 1779.5', good indication guns fired at surface. Little pressure increase. POOH, I/d guns, all shots fired. Rih w/GR/CCL& 20' of 2 1/2, 60 deg phasing, 6 spf,guns,t/tag @ 1781', correlate guns on depth w/top shot @ 1740', btm shot @ 1760', fire guns, good indication guns fired at surface. Little pressure increase. POOH, I/d guns, all shots fired. RD e-line, turn well over t/production, R/d e-line, turn well over t/production. 01/02/2016-Saturday PRE JOB JSA. RIG UP E-LINE. CHECK FIRE R1P1 R1P2. PRESSURE TEST 2,500 PSI. SWAB OPEN RIH R1P3. RECORD UP CORRELATION PASS R1P7 @1,750'. SEND CORRELATION OUT. RECORD UP R1P9. FIRED GUN 1 @ 1596.3 14' GUN R1P9. POOH R1P9.SURFACE BLEED DOWN CHANGE GUNS R1P10 CHECK FIRE. SWAB OPEN RIH R1P11. RECORD UP R1P12. RECORD UP R1P13. FIRED GUN 2 @ 1582.3 14' GUN R1P13. POOH R1P13. SURFACE BLEED DOWN CHANGE GUNS R1P14 CHECK FIRE. 15:38 SWAB OPEN RIH R1P15. RECORD UP R1P16. FIRED GUN 3 @ 1568.2 13' GUN R1P16. POOH R1P16. SURFACE RIG DOWN. OF T • • w\�l//7sv THE STATE Alaska Oil and Gas t, OfA L A S KA6. Conservation Commission ult- . z ,_ = 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OFALASI1*P �g�� Fax: 907.276.7542 `ANNE ? 9 9 ;jr r www.aogcc.alaska.gov Stan W. Golis 1- 00a. Operations Manager ` Hilcorp Alaska, LLC 3800 Centerpoint Dr., Ste. 1400 Anchorage, AK 99503 Re: Trading Bay Field,Undefined Oil Pool, Trading Bay St A-04 Sundry Number: 315-729 Dear Mr. Golis: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080,within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P oerster Chair DATED this Joy of December, 2015 Encl. RBDMS C 17 2015 • • , ,,,,-,, ,.,,, 1.:4,,,.... ,„..1...,,N STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Er; 0 4 ?,, APPLICATION FOR SUNDRY APPROVALS 140 4- /IS 20 AAC 25.280 GiGi 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Repair Well ❑ Z'Sperations shutdown Suspend ❑ Perforate 0 Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other. ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. Hilcorp Alaska,LLC • Exploratory ❑ Development El. 167-002 ` 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number. Anchorage,AK 99503 50-733-20001-00 • 7.If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? CO 93B i Will planned perforations require a spacing exception? Yes ❑ No 0 / Trading Bay St A-04 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0018731 . Trading Bay Field/Undefined Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 10,609 • 10,491 - 1,810- 1,790• 464 psi 1,820&3,360 3,306 Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 1,075' 3,090 psi 1,540 psi Intermediate Production 6,370' 9-5/8" 6,370' 6,281' 3,950 psi 2,570 psi Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 1,744-1,800 - 1,725-1,780 3-1/2"&2-7/8" 9.2#L-80&6.4#N-80 1,535&2,597' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): DLH Hyd Ret Pkr,Baker SC-1 Pkr,Baker Model D Pkr&TE-5 SSSV 1,506'(MD)1,492'(TVD)2,596'(MD)2,552'(TVD)3,180'(MD)3,118'(TVD)&310'(MD)310'(TVD) 12.Attachments: Proposal Summary ID Wellbore schematic (] 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development 0 ' Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 12/18/2015 OIL 0- WI NJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Trudi Hallett(907)777-8323 Email thallettehilcorp.com Printed Name Stan W.Golis Title Operations Manager G, Signature .J 1--G.... Phone (907)777-8356 Date 12.13 / LS-- COMMISSION SCOMMISSION USE ONLY Conditions of approval: Notify Conn ssion so that a representative may witness Sundry Number. 3� C Plug Integrity 0 BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: _ RBpM 12015 Post Initial Injection MIT Req'd? Yes ❑ No ❑ S Spacing Exception Required? Yes ❑ No E' Subsequent Form Required: /0 41 d Li APPROVED BY Approved by: eis2P9 _ COMMISSIONER THE COMMISSION Date:/L -/T —Js' 11.11111S-- // 'Z/$7i /L.r•is Submit Form and Form 10-403 Revised 11/2015 Approved application is vgfR2 ifikEe. apprbval. Attachments in Duplicate • • Well Work Prognosis Well: A-04 Hileorp Alaska,LLC Date: 12/02/2015 Well Name: Monopod A-04 API Number: 50-733-20001-00 Current Status: SI Producer Leg: N/A Estimated Start Date: 12/18/2015 Rig: N/A Reg.Approval Req'd? 10-403 Date Reg.Approval Rec'vd: Regulatory Contact: Juanita Lovett 777-8332 Permit to Drill Number: 167-002 First Call Engineer: Trudi Hallett (907) 777-8323 (0) (907) 301-6657 (M) Second Call Engineer: Ted Kramer (907) 777-8420 (0) (985) 867-0665 (M) Current BHP: 620 psi @ 1766' TVD/ 1786' MD SIBHP Survey 11/22/2015 Max. Exp'd BHP: 620 psi @ 1766' TVD/ 1786' MD Max Potential Surface Pressure (MPSP): 464 psi Using 0.1 psi/ft gradient @ new proposed top perf per 20 AAC 25.280(b)(4) Brief Well Summary A-04 is a shut in producer in the Undefined Oil Pool of Trading Bay Field. This project will re-perf the existing 25A sand and perforate±41' in the 23A sand within the same pool.7 Procedure: 1. MIRU E-line unit, PT lubricator to 1,500 psi. 2. RIH with perf guns. 3. Correlate on depth. 4. Add perforations per perforation request: Zone Bench Top, MD Btm, MD Total Ft Undefined 23A ±1,577' ±1,618' ±41' 1'd'tJ p Undefined 25A ±1,744' ±1,800' ±56' re- 17.4 5. Rig down E-Line. 6. Turn well over to production. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 0 SCHEMATIC • Trading Bay Unit Well #A-4 Completed: 11/18/15 RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 1 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' I 9-5/8" 40#&43.5 1-55&N-80 Butt 8.681 Surf 6370' Tubing: A ' 2 h. 3-1/2" 9.2 L-80 SuperMax Surf 1,535' 2-7/8" 6.4# N-80 Butt 1,820' 2,597' 3 1311 5 4 JEWELRY DETAIL 6 NO. Depth ID Item il 1640'-642' 41.20 Hanger Sqzd Ports 1660'-1695' 1 310' 2.813 SSSV-Baker TE-5 !' 1:rnea18/90 to 50Cps 50CPS1' 2 1,014' 2.992 GLM TOC 1,74C-1,800' 3 1,488' 2.992 Chemical Injection Mandrel 810 4 1,506' 4.000 Packer-9-5/8"DLH Hydraulic Retrievable Packer 7 "' - r.: - = 1820•-822' 5 1,524' 2.813 X-Nipple 6 1,535' 2.992 WLEG 7 1,820' CIBP 8 2,532' 2.313 Otis"XA"Sliding Sive 2104'-2160' 9 2,564' 2.313 Otis"X"Profile Nipple = 2176-2204 10 2,596' 3.00 Baker"S-22"Locator Seal Assy.190-47 11 2,596 4.75 96A4-47 SC-1 Gravel Pack Packer 2285'-2370' 12 2,601' 4.75 Model"S"GP Ext.w/Sldg Sive w/Lwr ext. 8 13 2,632 4.408 80.73'of 5"Blank Liner 9 14 2,712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3,160' 2.875 0-ring Seal Sub 11 ,<12596' 16 3,161 4.408 Lwr Tell Tail Screen.17.61' 0 17 3,179' 3.00 Snaplatch seal assy.190-47 12 18 3,180' 4.75 194-47 Model"D"Sump Pkr. L 13 2752'-2770' 2610-2630 FISH: 2899'-2935' 14 Drilled Mod"D"Pkr. 3/5/90 @ 3441' s =3005•-3030' Drilled Retainer 3/8/90 @ 3306' 3100'-3150' 1„ t 15 FILL 16 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM 17 18 lir}‹ 3180' 1 Perforation Detail Zone Top Btm Amount SPF Date Present Condition 3306' / AZN 25A • 1,744' 1,800' 56' 11/18/2015 Open f/Prod. 3360' 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated 31-8 2,810' 2,830' 20' 8 3/9/1990 Isolated 3437' 33-6 2,897' 2,935' 38' 8 3/9/1990 Isolated / \ 41-3 3,005' 3,030' 25' 8 3/9/1990 Isolated KB ELEV=101' 41-8 3,055' 3,150' 95' 8 3/9/1990 Isolated TD=10609' PBTD=1,810' 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd MAX ANGLE thru INTERVAL=15.45° 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 28' 2 9/27/1994 Isolated 26-7 2,285' 2,370' 85' 2 9/27/1994 Isolated Updated: 11/30/15 by JLL • PROPOSED ! Trading Bay Unit e HWell #A-4 Completed: 11/18/15 RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 1 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077 9 5/8" 40#&43.5 J-55&N-80 Butt 8.681 Surf 6370' Tubing: 4 11', 2 3-1/2" 9.2 L-80 SuperMax Surf 1,535' 2-7/8" 6.4# N-80 Butt 1,820' 2,597' 3 El 15 4 JEWELRY DETAIL 6 NO. Depth ID Item ▪ +1sn-+,618 41.20 Hanger 1540'-642' 1 310' 2.813 SSSV-Baker TE-5 Sqzd Perh 1660-1695 Preeeteetedto500pei• 2 1,014' 2.992 GLM on 3/18/90 3 1,488' 2.992 Chemical Injection Mandrel ±1,7aa'-51,800 4 1,506' 4.000 Packer-9-5/8"DLH Hydraulic Retrievable Packer TOO l v.+�*.At•IG-Woorl•a.<acrr"+mr• 1820'-822' 1,810' 5 1,524' 2.813 X-Nipple 6 1,535' 2.992 WLEG 7 1,820' CIBP 8 2,532' 2.313 Otis"XA"Sliding Sive 2104'-2160' 9 2,564' 2.313 Otis"X"Profile Nipple = 2175'-2204' 10 2,596' 3.00 Baker"S-22"Locator Seal Assy.190-47 31 2,596 4.75 96A4-47 SC-1 Gravel Pack Packer E zzas'-2370' 12 2,601' 4.75 Model"S"GP Ext.w/Sldg Sive w/Lwr ext. 8 13 2,632 4.408 80.73'of 5"Blank Liner 9 14 2,712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3,160' 2.875 0-ring Seal Sub 11 ><11 D\ 2596' 16 3,161 4.408 Lwr Tell Tail Screen.17.61' 0 12 17 3,179' 3.00 Snaplatch seal assy.190-47 18 3,180' 4.75 194-47 Model"D"Sump Pkr. L 13 2752'-2770' ® _2810'-2830' -2899'-2935' FISH: 14 3005'-3030' Drilled Mod"D"Pkr. 3/5/90 @ 3441' 3100-3150' Drilled Retainer 3/8/90 @ 3306' l- ' 15 FILL 16 17 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM 18 .- l� -' 3180' Perforation Detail Zone Top Btm Amount SPF Date Present Condition > 3306' AZN 23A ±1,577' ±1,618' ±41' Future ---.011_ 3360' AZN 25A ±1,744' ±1,800' ±56' Future/Re-pert Open f/Prod. - I 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated 3437' 31-8 2,810' 2,830' 20' 8 3/9/1990 Isolated l \ 33-6 2,897' 2,935' 38' 8 3/9/1990 Isolated KB ELEV=101' 41-3 3,005' 3,030' 25' 8 3/9/1990 Isolated TD=10609' PBTD=1,810' 41-8 3,055' 3,150' 95' 8 3/9/1990 Isolated MAX ANGLE thru INTERVAL=15.45° 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 28' 2 9/27/1994 Isolated 26-7 2,285' 2,370' 85' 2 9/27/1994 Isolated Updated: 12/02/15 by JLL • • $chwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, December 03, 2015 8:42 AM To: 'Trudi Hallett' Subject: RE: Monopod A-04 (PTD# 167-002) plug and perf uphole sundry application Trudi, } OK...will track that down for you and cancel the sundry. ( 3(S` 7Z-5 Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226) or(Guv.schwartz@alaska.gov). From: Trudi Hallett [mailto:thallett(ahilcorp.com) Sent: Wednesday, December 02, 2015 2:34 PM To: Schwartz, Guy L (DOA) Subject: Monopod A-04 (PTD# 167-002) plug and perf uphole sundry application Hello, Guy— Hilcorp sent a new sundry application over yesterday to plug the lower 25A sand of the Monopod A-o4(PTD#167- 002)and move uphole to perf the next sand. HOWEVER-today we saw the tbg pressure start to come back alive,so we would like to just re-perf the zone instead of plugging and moving up hole.We would like you to just send back or withdraw the sundry application we submitted yesterday and I will submit the new one tomorrow. Please feel free to give me a call if you need clarification.Thank you, sir! Thanks- Trudi Hallett I Opt ,.,,):� � Cook Inlet Offshore Asset Team I Hilcorp Alaska.LL( Hilcorp A Company Built on Energy thallett@hilcorp.com 0: 907.777.8323 C: 907.301.6657 1 10s RECEIVED • STATE OF ALASKA DEC 01 2015 ' ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations El Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate I] Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other. ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number Hilcorp Alaska, LLC ' Exploratory ❑ Development D. 167-002 • 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number. Anchorage,AK 99503 50-733-20001-00 - 7. If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? CO 93B Will planned perforations require a spacing exception? Yes ❑ No ❑ 4 Trading Bay St A-04 - ✓1, 9. Property Designation(Lease Number): 10.Field/Pool(s): ADL0018731 Trading Bay Field/Undefined Oil Pool / • 1. 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(M► Junk(MD): 10,609 - 10,491 - 1,810 1,790 464 psi d;;20&3,360 3,306 Casing Length Size MD TVD �" Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 3,090 psi 1,540 psi Intermediate / \ Production 6,370' 9-5/8" 6,370' :1' (�f 3,950 psi 2,570 psi Liner \v Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: .ing -.4•: Tubing MD(ft): 1,744-1,800 1,725-1,780 3-1/2"&2-7/8" .'•.2#L-Nt >•• N-80 1,535&2,597' Packers and SSSV Type: Packer and ' SV a (ft)and TVD(ft): + DLH Hyd Ret Pkr,Baker SC-1 Pkr,Baker Model D Pkr&TE-5 SSSV . 1,506' 5) ,4 is) s6'(MD)2,552'(TVD)3,180'(MD)3,118'(TVD)&310'(MD)310'(TVD) 12.Attachments: Proposal Summary 0 Wellbore schematic 0 /' Class aft- proposed work: Detailed Operations Program ❑ BOP Sketch ❑ pato ` a Stratigraphic❑ Development 0, Service ❑ 14. Estimated Date for 1 Well t s er proposed work: Commencing Operations: 12/15/2015 OIL k': • NJ ❑ WDSPL ❑ Suspended El16.Verbal Approval: Date: t.'' I WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: - GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure appr herein will not be deviated from without prior written approval. \ Contact Trudi Hallett(907)777-8323 N Email thallett@hilcorp.com Printed Name Stan W.Golis Title Operations Manager Signature 5606�tA Phone (907)777-8356 Date 12/1/2015 COMMISSION USE ONLY Conditions of approval: Notify Lommission so that a representative may witness Sundry Number: 3 t5 —i 2_6 Plug Integrity ❑ BOP Test Ii Mechanical Integrity Test ❑ Location Clearance ❑ Other /: CANNED FEB 0 2 2016 sclpfrc 0 4 2015 Post Initial Injection MIT Req'd? Yes ❑ No ❑/ Raptil Spacing Exception Required? Yes ❑ No z Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: g j r -fK3 1113/15 "I 1 273//- ¢� p +� Submitsn Form and Form 10-403 Revised 11/2015 ii pp rNAIL12 months from the date of approval. Attachments in Duplicate • Well Work Prognosis Well: A-04 Hilcorp Alaeka,LLf. Date: 11/30/2015 Well Name: Monopod A-04 API Number: 50-733-20001-00 Current Status: SI Producer Leg: N/A Estimated Start Date: 12/15/2015 Rig: N/A Reg.Approval Req'd? 10-403 Date Reg.Approval Rec'vd: Regulatory Contact: Juanita Lovett 777-8332 Permit to Drill Number: 167-002 First Call Engineer: Trudi Hallett (907) 777-8323 (0) (907) 301-6657 (M) Second Call Engineer: Ted Kramer (907) 777-8420 (0) (985)867-0665 (M) Current BHP: 620 psi @ 1766' ND/ 1786' MD SIBHP Survey 11/22/2015 Max. Exp'd BHP: 620 psi @ 1766' ND/ 1786' MD Max Potential Surface Pressure(MPSP): 464 psi Using 0.1 psi/ft gradient @ new proposed top perf per 20 AAC 25.280(b)(4) Brief Well Summary A-04 is a shut in producer in the Undefined Oil Pool of Trading Bay Field.This project will isolate the 25A sand move uphole and perforate±41' in the 23A sand within the same pool. J Procedure: 1. MIRU E-line unit, PT lubricator to 1,500 psi. 2. RIH setting plug at±1,740'. 3. Dump ±25' of cement on top of plug. 4. RIH with perf guns. 5. Correlate on depth. 6. Add perforations per perforation request: Zone Bench Top, MD Btm, MD Total Ft Undefined 23A ±1,577' ±1,618' ±41 I 7. Rig down E-Line. 8. Turn well over to production. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic II 0 SCHEMATIC • Trading Bay Unit Well #A-4 Completed: 11/18/15 RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 1I 13-3/8" 61.0 K 12.515 Surf 1077' 9-5/8" 40#&43.5 J-55-55&N-80 ButtButt.LT&C /11111 r 8.681 Surf 6370' Tubing: 2 3-1/2" 9.2 L-80 SuperMax Surf 1,535' 2-7/8" 6.4# N-80 Butt 1,820' 2,597' 1311 5 fr 3 4 6 JEWELRY DETAIL NO. Depth ID Item 1640'-642' 41.20 Hanger Sqzd Perla 1660-1695 1 310' 2.813 SSSV-Baker TE-5 orneiesodl°sooPa. 2 1,014' 2.992 GLM TOC 3 1,488' 2.992 Chemical Injection Mandrel 1,810' 1,744•-1,800' may... -.. .<. r..c�. 4 1,506' 4.000 Packer-9-5/8"DLH Hydraulic Retrievable Packer 7 1920-822' 5 1,524' 2.813 X-Nipple 6 1,535' 2.992 WLEG 7 1,820' CIBP 8 2,532' 2.313 Otis"XA"Sliding Sive 2104'-2160' 9 2,564' 2.313 Otis"X"Profile Nipple 2176•-2204' 10 • 2,596' 3.00 Baker"S-22"Locator Seal Assy.190-47 11 2,596 4.75 96A4-47 SC-1 Gravel Pack Packer 2285'-2370' 12 2,601' 4.75 Model"5"GP Ext.w/Sldg Sive w/Lwr ext. 8 13 2,632 4.408 80.73'of 5"Blank Liner ■ ■ 9 14 2,712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3,160' 2.875 O-ring Seal Sub 11 2596' 16 3,161 4.408 Lwr Tell Tail Screen.17.61' 0 17 3,179' 3.00 Snaplatch seal assy.190-47 12 18 3,180' 4.75 194-47 Model"D"Sump Pkr. L 13 2752'-2770' _ 2810'-2830' FISH: 2899'-2935' 14 Drilled Mod"D"Pkr. 3/5/90 @ 3441' s 3005'-3030' Drilled Retainer 3/8/90 @ 3306' 3100'-3150' L 15 FILL 16 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM r 17 18 �- _� 3180' Perforation Detail Zone Top Btm Amount SPF Date Present Condition - I 3306' AZN 25A 1,744' 1,800' 56' 11/18/2015 Open f/Prod. 3360' 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated -- I 31-8 2,810' 2,830' 20' 8 3/9/1990 Isolated 3437' 33-6 2,897' 2,935' 38' 8 3/9/1990 Isolated 41-3 3,005' 3,030' 25' 8 3/9/1990 Isolated KB ELEV=101' 41-8 3,055' 3,150' 95' 8 3/9/1990 Isolated TD=10609' PBTD=1,810' 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd MAX ANGLE thru INTERVAL=15.45° 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 28' 2 9/27/1994 Isolated 26-7 2,285' 2,370' 85' 2 9/27/1994 Isolated Updated: 11/30/15 byJLL n 0 • PROPOSED Trading Bay Unit Well #A-4 Completed: 11/18/15 RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 1 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' 111 L 9-5/8" 40#&43.5 J-55&N-80 Butt 8.681 Surf 6370' Tubing: 4 2 3-1/2" 9.2 L-80 SuperMax Surf 1,535' 2-7/8" 6.411 N-80 Butt 1,820' 2,597' 3 1 5 4 JEWELRY DETAIL _ 6 Nth Depth ID Item :1s77'-±1,618' 41,20 Hanger 1646-e42' 1 310' 2.813 SSSV-Baker TE-5 rarlsq:a Peas 1660-lass Presstestetl t°SOOPsi, 2 1,014' 2.992 GLM IF On 3/18/90 7 3 1,488' 2.992 Chemical Injection Mandrel 1,74C-1,800' 4 1,506' 4.000 Packer-9-5/8"DLH Hydraulic Retrievable Packer TO _. 1820-822 1.6C10 ' ' 5 1,524' 2.813 X-Nipple 8 6 1,535' 2.992 WLEG 7 ±1,740' Plug w/25'cement 8 1,820' CIBP 2104•-2160' 9 2,532' 2.313 Otis"XA"Sliding Slve = 2176-2204' 10 2,564' 2.313 Otis"X"Profile Nipple 11 2,596' 3.00 Baker"S-22"Locator Seal Assy.190-47 2286-2370' 12 2,596 4.75 96A4-47 SC-1 Gravel Pack Packer 9 13 2,601' 4.75 Model"S"GP Ext.w/Sldg Slve w/Lwr ext. 10 14 2,632 4.408 80.73'of 5"Blank Liner 11 15 2,712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 12 ><:1 2596' 16 3,160' 2.875 0-ring Seal Sub 0 13 17 3,161 4.408 Lwr Tell Tail Screen.17.61' 18 3,179' 3.00 Snaplatch seal assy.190-47 L14 19 3,180' 4.75 194-47 Model"D"Sump Pkr. =2752'-2770' =2810'-2830' 2896-2935' FISH: 15 3005'-3030' Drilled Mod"D"Pkr. 3/5/90 @ 3441' 3100'-3150' Drilled Retainer 3/8/90 @ 3306' L. 1 16 FILL 17 18 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM 1911 3180' Perforation Detail Zone Top Btm Amount SPF Date Present Condition F-. >--- . 3{ 306' J AZN 23A ±1,577' ±1,618' ±41' Future �'fl 3360' AZN 25A 1,744' 1,800' 56' 11/18/2015 Open f/Prod. 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated 3437' 31-8 2,810' 2,830' 20' 8 3/9/1990 Isolated / 33-6 2,897' 2,935' 38' 8 3/9/1990 Isolated KB ELEV=101' 41-3 3,005' 3,030' 25' 8 3/9/1990 Isolated TD=10609' PBTD=1,810' 41-8 3,055' 3,150' 95' 8 3/9/1990 Isolated MAX ANGLE thru INTERVAL=15.45° 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 28' 2 9/27/1994 Isolated 26-7 2,285' 2,370' 85' 2 9/27/1994 Isolated Updated: 12/01/15 by.ILL STATE OF ALASKA AL.A OIL AND GAS CONSERVATION COMM ION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations El Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown ❑ Performed: Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well El Re-enter Susp Well❑ Other: Run G/L CompletionE 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska,LLC Development 0 Exploratory ❑ 167-002 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99503 50-733-20001-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0018731 Trading Bay St A-04 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A Trading Bay Field/Undefined Oil,Middle Kenai B Oil&Middle Kenai C Oil Pools 11.Present Well Condition Summary: �a 4, p wx Total Depth measured 10,609 feet Plugs measured 1,820&3,360 fii# � 444 y1i"" true vertical 10,491 feet Junk measured 3,306 feet Effective Depth measured 1,810 feet Packer measured 1,506,2,596,3,180 feet true vertical 1,790 feet true vertical 1,492,2,552,3,118 feet )4 Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 1,075' 3,090 psi 1,540 psi Intermediate Production 6,370' 9-5/8" 6,370' 6,281' 3,950 psi 2,570 psi Liner Perforation depth Measured depth 1,744-2,370 feet ff■p4�5{ i C 4.1 1 True Vertical depth 1,725-2,334 feet 3-1/2" 9.2#/L-80 1,535'(MD) 1,521'(ND) Tubing(size,grade,measured and true vertical depth) 2-7/8" 6.4#/N-80 2,597'(MD) 2,553'(TVD) DLH Hyd Ret Pkr 1,506'(MD)1,492'(ND) Packers and SSSV(type,measured and true vertical depth) Baker SC-1 Pkr 2,596'(MD)2,552'(ND) Baker Model D Pkr 3,180'(MD)3,118'(ND) Baker TE-5 SSSV 310'(MD)310'(ND) 12.Stimulation or cement squeeze summary: Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 128 2 Subsequent to operation: 0 777 16 160 226 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory❑ Development Service❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil 0 Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-641 Contact Trudi Hallett(907)777-8323 Email thallett( hilcorp.com Printed Name Stan W.G``olis Title Operations Manager Signature 411Ap. . Phone (907)777-8356 Date 11/30/2015 �L.Ie/� RBDMS)DEC 0 310 r Form 10-404 Revised 5/2015 Af/ /_/°---- Submit Original Only • SCHEMATIC •• Trading Bay Unit .11Well #A-4 Completed: 11/18/15 RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' 1 9-5/8" 40#&43.5 J-55&N-80 Butt 8.681 Surf 6370' Tubing: A ME' 2 h. 3-1/2" 9.2 L-80 SuperMax Surf 1,535' 2-7/8" 6.4# N-80 Butt 1,820' 2,597' 3 4 IX I 5 JEWELRY DETAIL 6 NO. Depth ID Item 164V-642' 41,20 Hanger Sqzd Pert: 1660'-1695' 1 310' 2.813 SSSV-Baker TE-5 oPne 18100d1oSOOpsi, 2 1,014' 2.992 GLM TOC - 3 1,488' 2.992 Chemical Injection Mandrel 1,810' _ ,,744'-1,800' 4 1,506' 4.000 Packer-9-5/8"DLH Hydraulic Retrievable Packer 7182V-822' 5 1,524' 2.813 X-Nipple 6 1,535' 2.992 WLEG 7 1,820' CIBP 8 2,532' 2.313 Otis"XA"Sliding Sive =2104'-2160' 9 2,564' 2.313 Otis"X"Profile Nipple -..„E2175-2204' 10 2,596' 3.00 Baker"S-22"Locator Seal Assy.190-47 11 2,596 4.75 96A4-47 SC-1 Gravel Pack Packer 2285'-2370' 12 2,601' 4.75 Model"S"GP Ext.w/Sldg Sive w/Lwr ext. 8 13 2,632 4.408 80.73'of 5"Blank Liner 9 14 2,712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3,160' 2.875 0-ring Seal Sub 11 2596' 16 3,161 4.408 Lwr Tell Tail Screen.17.61' 17 3,179' 3.00 Snaplatch seal assy.190-47 0 12 18 3,180' 4.75 194-47 Model"D"Sump Pkr. L 13 2752'-2770' ® _2e,°'-2830' FISH: =2899'-2935' 14 Drilled Mod"D"Pkr. 3/5/90 @ 3441' r. =3005-3030' Drilled Retainer 3/8/90 @ 3306' =3100'-3150' L 151FILL 16 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM 17 18 r -><._ 3180' Perforation Detail Zone Top Btm Amount SPF Date _ Present Condition 3306' AZN 25A 1,744' 1,800' 56' 11/18/2015 Open f/Prod. 3360' 31-8 2,752' 2,770' 18' 8 3/9/1990 Isolated 31-8 2,810' 2,830' 20' 8 3/9/1990 Isolated 3437' 33-6 2,897' 2,935' 38' 8 3/9/1990 Isolated \ 41-3 3,005' 3,030' 25' 8 3/9/1990 Isolated KB ELEV=101' 41-8 3,055' 3,150' 95' 8 3/9/1990 Isolated TD=10609' PBTD=1,810' 24-A 1,660' 1,695' 35' 4 3/4/1990 _ Cmt Sqzd MAX ANGLE thru INTERVAL=15.45° 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Isolated 24-6 2,176' 2,204' 28' 2 9/27/1994 Isolated 26-7 2,285' 2,370' 85' 2 9/27/1994 Isolated Updated: 11/30/15 by JLL • 1:1Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 Monopod Rig 56 50-733-20001-00 167-002 11/2/15 11/21/15 Daily Operations: 11/02/2015- Monday PJSM.Test gas alarms. Monitor well, tubing pressure came up t/90 psi w/oil cap, ann 5 psi. R/u circ 127 bbls @ 2.8 BPM, 220 psi. Close ann. Bullhead 68 bbls @ 1.7bpm, 475psi. Monitor well. Work on activation list. Hang winterization curtain in cellar. R/u bails, troubleshoot& repair test pump. PTSM Hang tongs.Test flow paddle, good. Pressure up pulsation dampener t/500 psi. R/u chart recorder. Monitor well,tubing @ 100 psi w/oil cap, ann. 0. R/u circ. 180 bbls @ 3.2 BPM, 500 psi. Check well for flow. Slight flow of oil out of tubing. Circulate well to production header with FIW at 2.5 BPM/150 psi for a total of 140 bbls and chase with 12 bbls of 8.8#fluid. Monitor well for one hour. Well is static. Rig down circulating hoses. Set BPV. Nipple down tree.Verify lift threads to be 3 1/2" 8rd. Dress tubing spool and hanger. Install 13 5/8" riser. Nipple up BOPE. 11/03/2015-Tuesday N/U mud cross valves. Finished stacking up BOP. Checked accumulator bottle pressures. Changed out one bad bladder.Tq flange bolts. Install flow nipple. Rig up accumulator hoses.Test run accumulator. Add hydraulic fluid to system. Function test BOPE.Troubleshoot and resolve BOP control function issues. Repair packing leak on #1 electric accumulator pump. Install mousehole. Center stack with turnbuckles. Clean and organize cellar equipment. Make up 3 1/2" test joint. 11/04/2015-Wednesday Finish making up 3 1/2" test joint assembly. Fill stack with FIW and repair leaks on flow box. Begin testing BOPE. Repair kill line hose connection. Change ring gasket and change out hose on kill line. Continue testing BOPE components. Not able to get good test with 3 1/2" on annular preventer. Got okay from AOGCC (Lou Grimaldi)to proceed with BOP test without witness at 1900 hours.Test BOPE on 3 1/2" test joint as per sundry 250 L/2500 H. Did not attempt to retest annular.All �IP other tests good. Perform accumulator draw down test. Lay down 3 1/2" test assembly.Attempt to test blind rams to no ►�� avail. Pick up Kelly and test upper and lower valves (good tests)while troubleshooting accumulator manifold pressure issues. Blow down Kelly and stand back same. Make up 2 7/8" test joint. 11/05/2015-Thursday Test variable rams with 2 7/8" tubular.Attempt to test annular preventer without success.Troubleshoot& re-test w/no success. (Line up for another annular& blind ram blocks to be delivered t/dock. Continue t/troubleshoot issues while waiting for boat currently on weather hold). Blow down choke &stack, pull ram blocks inspect&flip over, re-install. Attempt t/test blinds with no success. Re-install test jt.Test w/variable rams t/verify no leak at hanger. Wait on orders, housekeeping, repair bolts on roughneck. Attempt t/test annular, no go, blow down stack, unload boat w/annular& blind ram blocks. Change out blind ram blocks.Test blind rams 250 L/2500 H. Good test. Change out annular preventers. Rig up flow nipple and drip pans. Clean rig cellar. M/u 2 7/8 tj,function test annular x5,test annular 250 low& 2500 high, 5 min each,good, blow down lines. R/d tj &eq. • S Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 Monopod Rig 56 50-733-20001-00 167-002 11/2/15 11/21/15 Daily Operations: 11/06/2015 - Friday R/u circulate hole t/ production @2.8 BPM, 180 psi. Monitor well. L/d tj. Pull BPV. M/u landing jt. R/u tubing tongs. Install mouse hole. Fill trip tank. Repair latch on tongs. Repair stand pipe valve. Pull hanger @ 33k, falling t/26k, fill hole 8 bbls. Repair hyd leak on rig floor fitting. L/D hanger& landing jt. Circulate STS to at 6 BPM/460 psi to clear oil cap in well bore. Blow down lines. Establish loss rate at 6 BPH. POOH laying down 2 7/8" BTC tubing and jewelry. Pressure wash each joint as it is being pulled. Clean rig floor. Check run rotary table. Loss rate 3.2 BPH. M/U wear ring running tool & insert wear bushing, prep BHA#1. 11/07/2015-Saturday P/U BHA. P/u M/u bumper sub, xo,junk basket. M/U running tool, set wear bushing. Cont. p/u BHA#1 - Burn shoe, Bushing, double pin xo, 2-junk baskets, bit sub, xo, bumper jar, oil jar, 6-4 3/4 dc, acc.jar=244.4'. RIH p/u 3 1/2" dp, t/tag @ 1,590' , up, do wt 50k. Mill f/ 1,590' t/1,593' (40" actual). Rot wt 50k, 60 rpm, 1k rot tq, 5 BPM/250 psi. Circulate hole clean. Blow down lines. Static loss rate = 3.0 BPH. POOH with BHA#1.Work BHA. Recovered 5 lbs out of boot baskets and 2 lbs off of ditch magnets. Stop ring from packer was lodged inside mill shoe. Shoe was 50%worn. M/U BHA#2: Burn shoe, wash pipe, bushing, double pin xo, 2-junk baskets, bit sub, xo, bumper jar, oil jar, 6-4 3/4 dc, acc.jars = 275.08'. RIH with BHA#2 (mill shoe) to 1,585'. P/U Kelly. Establish parameters: 52 P/U, 48 S/O, 50 Rot/60 RPM, 5 BPM/220 psi. Mill on packer at 1,593'. 11/08/2015-Sunday Mill on packer 1,593' to 1,595'. Parameters: 52 P/U, 48 S/O, 50 Rot/60 RPM, 5 BPM/220 psi. Used various parameters while milling including 'dry-drilling', different rotary speeds and weight on mill from 4 K up to 12 K at the end. Also, spudded on the packer several times in the last couple of hours before deciding to POOH. Monitor well for loss rate. <1 BPH. Blow down lines. POOH with BHA#2. Loss rate <1 BPH. Work BHA. Mill shoe was 90%worn. Clean boot baskets. Recovered 15.0 lbs out of boot baskets and 16.5 lbs off of ditch magnets. M/U BHA#3: Burn shoe, wash pipe, bushing, double pin xo, 2-junk baskets, bit sub, xo, bumper jar, oil jar, 6-4 3/4 dc, acc.jars= 275.38'. • Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 Monopod Rig 56 50-733-20001-00 167-002 11/2/15 11/21/15 Daily Operations: 11/09/2015- Monday RIH with BHA#3. t/ 1,556'. P/u Kelly, up wt 50k, do wt 50k, circ @ 5 bpm, 220 psi. RIH tag 1,591', roll off, cont t/1,595'. Mill f/ 1,595' t/ 1,596', rot 80 rpm, rot wt 50k, circ 5.5 bpm, 240 psi, wt fell off @ 1,596'. CBU x2, M/u jt, RIH t/ 1,632' clear. Blow down, stand back kelly, POOH.Tight @ 1,572', rot free, tight @ 1,510', wk free. L/D BHA#3, p/u BHA#4, -8 1/8 cut lip guide, overshot dressed w/6 5/8", upper ext,top sub, xo, bumper sub, oil jar, 6-4 3/4 dc, acc jar= 231.01'. RIH to 1,471'. Did not engage fish at 1,596'. Chase down hole picking up drill pipe to 1,825'. Attempt to engage fish several times without success. Circulate hole at 4.5 BPM/300 psi. Blow down lines. POOH with BHA#4. Work BHA. P/U BHA#5: 8 1/2"junk mill, 8 1/2" string mill, double pin sub, 2 ea boot baskets, bit sub,X-0, BS/OJ, 6 ea 4 3/4" drill collars, acc jars= 248.33'. Service rig and equipment. RIH and tag TOF @ 1,825'. Attempt to push down hole with 25K set down weight with no success. Circulate hole clean at 7 BPM/700 psi. Blow down lines. POOH with BHA#5.Work BHA#5. Drop string mill and make up 9 5/8" casing scraper. BHA#6-8 1/2"junk mill, 8 1/2" csg. scraper, double pin sub, 2 ea boot baskets, bit sub, X-O, BS/OJ, 6 ea 4 3/4" drill collars, acc jars=244.73'. 11/10/2015-Tuesday RIH w/BHA#6, t/tag @ 1,825'. L/D jt, CBU clean @ 7 BPM, 700 psi, blow down. POOH L/d BHA. R/U e-line. RIH w/GR/CCL, tag TOF, log&correlate t/PETRA log provided by HAK geologist.Showing TOF @ 1,820'. POOH r/d e-line. Repair leak on ST- 80(iron roughneck). P/U 9 5/8" CIBP w/setting tool. RIH. Set CIBP at 1,820'. POOH and lay down running tool. Close blind rams. Attempt to test 9 5/8" casing without success. Pump at 1.8 BPM/500 psi. 13 3/8" annulus began at 300 psi and had no increase or change. Blow down lines. Repack 4" stand pipe valve. Wait on circulating sub for RTTS. Make up RTTS and RIH to 1,622'. Begin testing forcasing leak.Test#1 @ 1622': Annulus 1550 psi -700 psi loss In 1 minute_Fail,Test#2 @ 1622': DP/ 9 5/8" annulus pumping at 1.8 BPM/500 psi. Fail.Test#3 @ 1590': Annulus 1500 psi- 700 psi loss in 1 minute. Fail.Test#4 @ 1812': DP/9 5/8" annulus 1500 psi-800 psi in 2 minutes. Fail.Test#5 @ 1527': Annulus 1500 psi-800 psi loss in 1 minute. Fail.Test#6 @ 1048': Annulus 1500 psi-800 psi loss in 1 minute. Fail. 11/11/2015-Wednesday Cont. csg test,Test#7 @ 570': Annulus 1500 psi -800 psi loss in 1 minute. Fail. POOH look at element on packer,good. RIH set @ 285, unable to set packer. RIH t/570,Test pressure up t/1500. Close in kill &choke lines t/test surface eq. Hold 5 min, good. Open choke pressure,fell t/200 psi. Bleed down POOH. RIH w/6 D/C&6 stands of 3 1/2 dp t/755'. M/U RTTS. RIH t/105', set&test t/1500 PSI,fail. Check surface equip, good. POOH. L/d packer. Stand back D/P &collars. Blow down surface equip. R/U e-line. RIH w/Caliper log- log f/150't/surface. RIH t/ 1,820', log up t/surface. R/d a-line. Send logs in t/analyze. Winterize substructure while waiting on orders. Pick up drill collars and RTTS. RIH and attempt to test casing at 80', 106' and 480'without success. RTTS was leaking back through drill pipe. POOH and position RTTS below drill collars. RIH and_set RTTS at 1,630'.Test#1 @ 1,630': Annulus 1520 psi- 1510 psi loss in 10 minutes. Good Test.Test#2 @ 1,726': Annulus leaking at 1.2 BPM/300 psi. Fail.Test#3 @ 1,726': DP/9 5/8" annulus 1550 psi-800 psi in 1 minute. Fail.Test#4 @ 1,788': DP/9 5/8" annulus 1500 psi-800 psi in 2 minutes. Fail. Bleed off and blow down all lines. POOH and lay down RTTS. Perform rig maintenance and housekeeping while waiting on orders. • • • • Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 Monopod Rig 56 50-733-20001-00 167-002 11/2/15 11/21/15 Daily Operations: 11/12/2015-Thursday Rig maintenance and housekeeping while waiting on orders. Monitor well on trip tank. Grease choke manifold and BOP valves. R/U mule on derrick board. Work on choke manifold valve#9. TIHwith open ended drill pipe and tag CIBP at 1,820'. Hold PJSM. Rig up Schlumberger cement lines and equipment.Test cement lines at 4000 psi. Had several leaks. Replace valves and chiksans and retest okay. Schlumberger pump 10 bbls FIW, 18.6 bbls 15.9 ppg Class G cement and chase with 10 bbls FIW. Held 100 psi back pressure with choke while pumping cement. Cement in place at 2130 hrs. POOH 4 stands to 1,430'. Close pipe rams. Rig up cement lines to SLB.SLB pumped 1.25 bbl squeeze before pump failure.Take over with rig pump and squeeze an additional 3 bbls(4.25 bbl total) at 1/2 BPM/500 psi. Hold pressure for 15 minutes. Bleed down and blow down lines and rig down same. Circulate to clear drill pipe at 6 BPM/400 psi. Blow down lines and clear rig floor. POOH standing back 3 1/2" drill pipe. Pick up Kelly. Flush stack and tubing spool/wear bushing. Stand Kelly back. Pull wear bushing. Make up 3 1/2"test joint. Fill choke manifold. Shell test BOPE and choke manifold valve #9. Repair CM valve#9. AOGCC will witness test this AM. 11/13/2015- Friday Seat test plug. Shell test BOPE 250 L/2500 H.Test BOPE as per sundry at 250 L/2500 H with AOGCC witness (Lou Grimaldi). Rebuild CMV#9 and retest okay. Install wear bushing. Lay down test joint. Close blind rams. Test 9 5/8" casing from surface to TOC at 1,575' at 1500 psi for 15 minutes. Good test. Blow down choke manifold and mud lines. Lay down 4 stands of 3 1/2" drill pipe. Make BHA#6: 8 1/2" mill tooth bit, bit sub w/float, X0, BS/OJ, 6 ea 4 3/4" drill collars, acc.jars= 225.07. RIH and tag TOC at 1,575'. Pick up Kelly. Establish parameters: P/U 48K, S/O 48K, Rot 48K at 60 RPM and 500 ft/lbs torque. 7 BPM/380 psi. Drill hard cement (30 FPH avg.)from 1,575'to 1,699'. Circulate hole clean.Test 9 5/8" casing at 1550 psi/10 minutes. Bled down to 1520 psi. Good test. Blow down choke manifold and drain gas buster. Drill hard cement 1,699' to 1,722'. Same parameters. 11/14/2015-Saturday Drill cement 1,722' to 1,810'. Parameters: P/U 48K, 5/0 48K, Rot 48K at 60 RPM and 500 ft/lbs torque. 7 BPM/380 psi. CBU clean @ 7 BPM/380 psi. Blow down Kelly& stand back. M/u head pin.Test 9 5/8" casing t/ 1500psi on chart for 30 minutes. Good test. Blow down lines. POOH with BHA#6. R/U Pollard a-line. Run CBL from 1,810'to surface. R/D Pollard e- line. RIH with bit, bit sub, 6 DC's and 10 stands of drill pipe to 1,143'. Pick up storm packer. RIH and set at 300'.Test same at 1500 psi. Blow down lines. POOH standing back 3 stands. Pull wear bushing. Nipple down flow nipple, drip pans and BOP. • ! Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 Monopod Rig 56 50-733-20001-00 167-002 11/2/15 11/21/15 Daily Operations: 11/15/2015-Sunday Nipple down BOPE. Hang off in cellar. Pull riser& 13 5/8" 3k x 11" 3k tubing spool. Swap out tubing spool &xo t/13 5/8" 3k, x 11" 5k,tubin s ool. Prep wellhead. N/u tubing spool, riser&stack up BOPE.Torque bolts& install flow nipple. RIH engage packer, close pipe rams & P/T flange breaks at 250 L/1500 H. Good test. POOH 1/d storm packer. RIH to 1,810'. Displace well at 3 BPM to production header with clean FIW. Blow down lines. Fill trip tank. Install mouse hole. POOH laying Q down 3 1/2" drill pipe and drill collars. Pull wear bushing. Clear rig floor. Strap 3 1/2" SuperMax 9.2#tubing. Prepare to pick 5 r up completion string. Hang control line and sheave. R/U power tongs. Pick up WLEG,X-nipple and DHL Hydraulic Retrievable packer. RIH picking up completion string. 11/16/2015- Monday Cont.,RJHpJu 3 112" supermax completion t/1,460' (tested SSSV prior t/running in hole, good). M/u landing jt& hanger. M/u, terminate lines t/ hanger&test good. Land hanger, up do wt 25k, placing tubing tail @ 1,535', packer @1,506'. R/u pressure up t/3500psi. Set packer/test tubing good. R/u on annulus t/test packer, had leak up tubing, suspect gas mandrel 410 valve. R/u W/L. RIH pull gas valve, replace w/dummy valve. R/u test packer t/1500 psi f/30 min good. R/u W/L. RIH c/o gas a valves, pull dart& plug. Pull landing joint. Set BPV. Cut control line. Rig down floor equipment. Flush mud lines, Kelly, cement line, choke line, etc. and blow down same. Nipple down flow nipple, drip pan, mouse holes, choke and kill hoses, BOPE and riser. 11/17/2015-Tuesday Continue to nipple up tree and controls, test tree.Test adapter flanges 250/5000 psi. Remove both bridge cranes f/cellar, set back both mouse holes in derrick and secure. Continue to clean up rig floor and derrick. Held safety mtg. Clean trip tank and all hoses etc in cellar. Grease flanges on BOP equipment.Work on stack out list. Pull brushes R/T filled choke manifold with oil, pull hydraulic hose out of cellar and put in box. Cleaned reserve tank. Pump fluid out of pits to production. R/d down HP mud line from rig.Tear down#2 mud pump.Tie into casing with 3/8 line and displace tbg&casing down to GLM. Recovered 71 bbls. Max pressure on csg 665 psi. Rig crew continuing to work on stack check list. Bleed csg to 250 psi. M/U 2" x 16' 6 SPF, 60 degree phasing, Deep penetrating perforating gun.Test to 2500 psi. Good. Bleed off, open well and RIH. Log, correlate depth and send to office for approval. Received approval, shot well from 1,784 to 1,800'. Saw small increase on tbg. POOH, gun fired. L/D 16' gun and P/U 20'gun same. 11/18/2015-Wednesday RIH w/2.5" x 16' 6 SPF, 60 degree phasing, deep penetrating perforating gun, correlate on depth @ 1,764'-1,784', fire gun. Good indication gun fired. POOH 1/d guns, all shots fired. P/U, RIH w/2.5" x 16' 6 SPF, 60 degree phasing, deep penetrating perforating gun, correlate on depth @ 1,744'-1,764',fire gun. Good indication gun fired. POOH l/d guns, all shots fired. Pressure when ooh 400 psi. R/D and ready W/L for demobe. Offload pump and acid tank from boat to pipe rack. Continue to demobe rig. Continue on mud pumps. Continue to clean pits. Disassemble rig, finish pits. Remove bails from block. P/U all tools and put in box. Pressure wash rotary table and floor. Regrease bushings, pull flow lines and clean in sub. Finish mud pumps. Finish sub R/D and cover shelters. Follow check list to dry stack rig. • Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date A-04 Monopod Rig 56 50-733-20001-00 167-002 11/2/15 11/21/15 Daily Operations: 11/19/2015-Thursday Cont. wk on stack out list. Backload boat. Grease all sheaves in derrick.Tie back all lines in derrick. Cleaned & packed BOP stack bolts, packed up Hyd tq. wrench. Tap all plugs on charge pumps. Drain all lines, hoses and pumps in hopper room. Clean and organize pump room and cellar. R/D mule f/derrick. Clean and store derrick ropes. 11/20/2015 - Friday Cont. wk on stack out list. R/d & clean vac unit. Prep & skid rig north. Service & cover d/w. Remove walkway& lock out door f/choke room t/north landing. R/d FIW t/top deck. R/d service lines t/sub-base, coil hoses& store in hopper room. Cover iron rack &tuggers. PTSM. Finish packing up & prepping connexs for storage. Pack up hand tools. Housekeeping &organize decks. 11/21/2015 -Saturday Cont. housekeeping. R/u &skid rig south &west. Park on grease, secure same.Turn keys over t/ production. Prep boat backload. 1C7o02 Regg, James B (DOA) From: Brooks, Phoebe L (DOA) Sent: Tuesday, November 10, 2015 3:58 PM C� To: Harold Soule - (C) Cc: Regg,James B (DOA) Subject: RE:All American 56 11-06-15, A-04 BOPE Test Report Attachments: All American 56 11-06-15 Revised.xlsx Attached is a revised report adding the PTD#1670020, changing the date to reflect 11106/15, and changing all Misc. fields to reflect"NA". Please update your copy or let me know if you disagree. Thank you, Phoebe Phoebe Brookss (, Statistical Technician II Alaska Oil and Gas Conservation Commission Phone: 907-793-1242 Fax: 907-276-7542 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you. are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From: Harold Soule - (C) [mailto:hsoule@hilcorp.com] Sent: Saturday, November 07, 2015 8:00 PM To: Regg, James B (DOA); DOA AOGCC Prudhoe Bay; Brooks, Phoebe L (DOA) Cc: Rick Brumley - (C) Subject: All American 56 11-06-15, A-04 BOPE Test Report 1 • • STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: jim.regq c(D.alaska.gov AOGCC.I nspectorsCa"alaska.gov phoebe.brooksalaska.qov Contractor: All American Oil - Rig No.: 56 DATE: 11/6/15 Rig Rep.: Mike Spaulding Rig Phone: 776-6675 Operator: Hilcorp Alaska Op. Phone: 776-6675 Rep.: Soule/Brumley E-Mail hsoule@hilcorp.com Well Name: TBS A-04 - PTD# 1670020 - Sundry# 315-641 Operation: Drilling: Workover: X Explor.: Test: Initial: X , Weekly: Bi-Weekly: Test Pressure(psi): Rams: 250/2500 , Annular: 250/2500 - Valves: 250/2500 MASP: 631 — MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen. P , Well Sign P - Upper Kelly 1 P • Housekeeping P - Rig P " Lower Kelly 1 P • PTD On Location P - Hazard Sec. P ' Ball Type 1 P • Standing Order Posted P , Misc. NA Inside BOP 1 - P. FSV Misc 0 NA BOP STACK: Quantity Size/Type Test Result MUD SYSTEM: Visual Alarm Stripper 0 NA Trip Tank P . P • Annular Preventer 1 - 13 5/8"5M FP ✓ Pit Level Indicators P P #1 Rams 1 - 2 7/8 x 5 VBR P Flow Indicator P " P _ #2 Rams 1 . 13 5/8"Blind FP ✓ Meth Gas Detector P - P #3 Rams 0 NA H2S Gas Detector P P . #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA Quantity Test Result Choke Ln.Valves 1 - 3 1/8"5M P ' Inside Reel valves 0 NA HCR Valves 2 2 1/16 5M FP v---- Kill Kill Line Valves 1 2 1/16 5M P - Check Valve 0 NA ACCUMULATOR SYSTEM: BOP Misc 0 NA Time/Pressure Test Result System Pressure(psi) 3000 P CHOKE MANIFOLD: Pressure After Closure(psi) 1400 P Quantity Test Result 200 psi Attained (sec) 19 P No.Valves 14 . P - Full Pressure Attained(sec) 127 - P Manual Chokes 2 P Blind Switch Covers: All stations Yes Hydraulic Chokes 1 • P - Nitgn. Bottles#&psi(Avg.): 6 @ 2310 psi - P CH Misc 0 NA ACC Misc 0 NA Test Results Number of Failures: 3 Test Time: 34.0 Hours Repair or replacement of equipment will be made within days. Notify the AOGCC of repairs with written confirmation to:AOGCC.Inspectors@alaska.gov Remarks: Tested w/3 1/2&2 7/8 TJ, Re-tested Choke HCR good, Had a failure on blind rams,changed out blind ram blocks, tested good, had failure on Annular, changed out annular,tested good Ti.--4-Cixa+S ale ,t I�S`+- t, ,tce 2 „ctcJ AOGCC Inspection 24 hr Notice Yes Date/Time 11-1-15 Waived By Lou Grimaldi Test Start Date/Time: 11/4/2015 20:00 (date) (time) Witness Test Finish Date/Time: 11/6/2015 6:00 Form 10-424(Revised 11/2015) All American 56 11-06-15 Revised.xlsx ' 0 it QA 1.C p( L5to '6--TC-sr 71;(1i 4-04 (t'W (( 7otrzc) ____ • , , _ , . _ .._ ' • ----- 4/4--11(k/6' ,...10.t. _______;_ __Z-- , ... ......, ----4 . ----- ---,, ---.... --„, _ _ --_ .- .._--- , ._-- „--- ----,-- ._.3500 -------- ------ -----, -----,..: - 'N ..---- ! ----- --_, --..... ---.. -... - - — • --------- -- -?,-.. ''---... -. - „..... , -- ,...„-- ,_,---- : '- ---, -- -- --,.. -. ,-- ...-. ---„„ps __-.-•300° 7"------- -'-'''''••,, -, `'`,. - N '\ .• ' -. ---i -''--: . • --' ' V,)c” . - .., ,--.-- . :' . 7--- • o --. ____ , •-----7---- 1,4'4' '-.'- . . '' '1'''' ' ' '• \'', \ ---' Cl•-,n . ----- -.. -- '' - • 2 A/ • s-. \ \ `. , — 0 . ' A:\ ‘ - , ' ..- -' /i. / •. , . _.461-. 7 ' •c. ' -- ,-.___:4,- A . - . . ,.. . . . • .,41ir 5 t -77- 7--'- • 17 1 ek. 4111tilL • % . . - ' 7 . . . , , \ . N. . ,,, -9.40, , • s __ --------„ . - — jap40 .., - ... L fvt _ • ------- . \ V6 4 i Al / # _ - '). ' ,__ . ._,. - -- , \ - \ WI4p-, ,--- ; '1 ' • ' . CHART NC. '''",:- 'AP-:--:1- -.:--: _T ", . :-1 - z, ‘ 1 ' \ •• - -:' 0 • ° ' (IL. \ • l'.- I 1 METE:-Z -..."--- II •1 I A C HA R :11- - , . , ' . • , A • ____:,- _..,_, • I \ ---4---f-3 8 1 . 1 : ! ii ------- 1 , , , t ; , re . LIIii1 . 75 \ -Z-•. -O . ' Zi. ' . _...„__ - . . lini • - •• ,... : / / i , i , 1 .? • In 0 - P ' 4_.0c,A-•-,,.17fafei • ,...: \ ..... • • ..._ , / •1, , • . „.e.„ , _ • - \ \\;),,R.,. ,.• . . AV , , , _ *---,,,,,_ r- ,-°_,A,(.4, / 111. 11101. \* ..,•\ • „..., ,,c .,,,.,c....„ . , , i . , N.,... -.1"›,..: , . .,,,,,,.„ -, ,,,= _ i ..- ,:.,,, . \ .\.....0 . ....'• tk.'" : c,..,....''r i / i / , \ ::/ .., .. _____ . - , Ic A ‘''---.: --/--------- *— / / / i . -K,:'• - * \ / 1" I / --- „,, -'7`.•--___ rf__, , .._____.-:-'''' , .-\, •1;‘••••• ' : ,.'s,.. \'4,., / / / , 1.• c.1 / / / / \ \' • . ' ''-t l --'-'-----------— --'--.:°°'' .-.>-‘ -'-'.-- ''. \ \• - - .s' s.' '''' . ! -.-----__ '11 • ' -1?..‘>l' ., •• ,_, --- t L . ______--_ ., ., . , --.......*„...,„ . , -- ---------r- „,,.•-•”” _,..., ..„.../ /-/ % / / Cit' / ' i / . / / ----.......,..... . 1 s_ ,-` l . / / / i / / 27— , •--- --'-•7..0 0 —- ___,I..-- ___.-•.-' ,,„,--'" v,..-" ./' / ./.' ,y,, ---. , .--• 1 --....._ _ . 'N.. . ' -------------,"3'-';...3 -------- ---- - --- 7.-----____ --•"'--1---1--•""''...'---------- 7 , ------------i:-000r---- ____t___- _ __....-. 0 -----. ...„. _---- ......-' - , .. - --- ,.•'" 2 „--- . . PCJ /P 0 r k ikt s - vs'of T A--04 ( /61 c°24)) 04_ -ll/ ((S - ..... ------..„, --....., -�__ _3000.1-------- - \ \ \ \, \. �b / ice- - 2pOD \ •-� \��\ \\ \f\,l � t50D � )('-, --. \ .� X \ \ � \ --- \Jf �Sp6 \ / a' rf,;i c,�n,.,.. \‘ \ \ \1 14r ., . \ \ '•\,4, ' C CHART NO. MC MP ` Nu u 5000 4HR - 1 0 I mE T ER �.., - \-H _ 0 O ; j iateF 0 0 0.. o 1 $ > A ,nib it-y— /.� I .I ilk i \ \ `\ .\,,,>"(..' f ipD "-----.. • . l \ _ `� _ 000 t 1 r --- -F00`Z / \ // / \ 7 ---------______-1-000 -- _. — ODD E-� '' /\ y \\�`� —_ 'Jim / \\y _ f 000P —f —`'_- / - oosr-- - - _ i f J • 2-1 G 41 p( i2 5(0 - 3cfri�',— 4 T 't,L A--04-(Prn /67ccr ) . vi, iL/&(I5- ii t►+ •50 - N ' .DDf' -• _ I`_ ti` s \ \�\ `\ ti_ � \ "-. _1 �/{/ •rt. \ ,` \� \ \ . 1 / \ • I4--- , r /pII. r / i y o d o 0 ! ! .,n j ! i )i 1 M , s... ._o. _ ._o ._- .o • o t . 7 j� ) ! . � rte-, ; . �I ' i� ^ 1 }: Y. .. / / N/ . ' r� \; —I . - '/ / /////• / l ti r TTTT ; V A �� r / / �� �; � Cl" v yC 1 j/ / '/ i \\\ fff _ L r \. __.rt xa r ; • • _i________ 1,,,,,,,,--- / _ / / per N, V�. – f DDSS " -y-" _/ %i " .'"•-• _ — e a _ .- How - 3or, AUC A-04 CP 161 0021.%) ,,, 'Vie_ 1116,115- 30 M3 / -'______4:____________I----------- \ / / -,_ , /;/ / ' _,/�' -_-- _fit. \ �\ \•\, �' (�O f� r / � ''1 ` / ~� j .,./ n-\ \\s„ �Q /C /t 7 � z ` (Soo j - O DO / idsG__� _ Gj I a \f '‘G. ),,,'. ', \ . \ y Xy\i/:// . 00 \://"...r (--- A-:. --0., --1- -7----7--. >l , r- OO� '� 1X� O� r `� - _ i� �t �_i\. �. .- t : ' Ni7/ Y \I \\ 11 \ ' -�i1 . Y. t_ 1 I - 1 , l • \ ' 1 . , \ �3 '. ! � t ' tt ' ti ` . ) . ` \ � ter `+, / ` 1 , \ . ,,f , // p � x / // y 34 ;' v pO \��a \ \ tet' , 0 41 \\ N, ."---, ' _ ,,,Q,"1.- ,,,' / /� / ppe _ /// f • 9 \� ` / 1 V �- o� "_ - a UL` - 41 • • i 3RJ -c1- (Puc\10002.0 i ----- so i _lti �i�i _••-,L---.------- ._t-_---� -- • • ---,,,, -,,,:`,To0 \ . \ s 0 \ 1 ' �__ �o 00- — _-2� --' -------71-- .. -/600 .-- • ,,,..,........N4'°4 il‘ • • , I 43 SZ1 1q, / p \ ` r r ,y • : \\ f / / tiq • U N.`iv 1 i ra l %::::• C...< ., . / 1 i -) - . \• �' °o" ^-- / N N, ''' °I-"-- // / ` \��/7(00°a\�--....,y1 _� ,-": x�oar \ \,, °°41 �� n-' " _ f . 00, ---....„.. -,..„4... ,..•-• 77- (// /// \ O°S� // r P } �r f-- _-- . t _.--- ,\[ f\!_ os - oz a♦ p£ . Akep 4 P& zi- Ellt • �,�{A--cG-Cnt I�-7t02 ) r „, • HILCORP „.,..., j BOP TEST SHEET r” DATE: 11-4-15/ 11-6-15 r RIG CONTRACTOR: All American Oilfield RIG # 56 TIME: WELL NAME: A-04 TYPE OF OPERATION - (DRILLING I WORKOVER I OTHER): Workover HILCORP REP: Soule/ Brumley RIG SUPERVISOR: Mike Spalding SUPERINTENDENT: TESTING COMPANY: n/a DP SIZES: 3 1/2 2 7/8 BOP SIZE & RATING: 13 5/8 5K Test# Components Tested Minutes Held Low PSI High PSI Pass/ (Low/High) Fail 1 Pipe rams w/3 1/2 TJ,dart valve,4"demco kill line valve,CMV 3,5,15,16 5 min 250 2500 Pass 2 3.5 TIW valve,Kill HCR,CMV 8,9,12,13,14 5 min 250 2500 Pass 3 CMV 1,7,10,11,manual kill line valve 5 min 250 2500 Pass 4 CMV 2,4,6 5 min 250 2500 Pass 5 Choke HCR,(re-test w/2 7/8 pipe rams) 5 min 250 2500 Fail 6 Manual choke line valve 5 min 250 2500 Pass 7 Blind rams 5 min 250 2500 Fail 8 Upper Kelly valve 5 min 250 2500 Pass 9 Lower Kelly valve 5 min 250 2500 Pass 10 Pipe rams w/2 7/8 TJ,Choke line HCR 5 min 250 2500 Pass 11 Annular w/2 7/8 TJ 5 min 250 2500 Fail 12 Blind Rams(changed out ram blocks) 5 min 250 2500 Pass 13 Anullar w/2 7/8 TJ(changed out Annular) 5 min 250 2500 Pass Accumulator Test Accumulator Manifold Annular Preventer Type Closing Time Initial Pressure Shaffer 13 3/8" Final Pressure Re-charge Time • • • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Tuesday, November 10, 2015 2:55 PM To: 'Trudi Hallett' Cc: Juanita Lovett; Stan Golis Subject: RE:A-04/ Monopod Rig#56 Sundry No. 315-641, PTD: 167-002 Trudi, Approval granted to set CIBP uphole at 1820 ft. MD. This change would not necessarily require MOC documentation since it is a minor change to the program. Any major changes to the approved sundry would however need to be documented with the MOC form. I agree trying to mill junk for extra depth is not worth it and may only cause more casing damage. Guy Schwartz Sr. Petroleum Engineer AOGCC SCAM MAY 1 1 2016 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226) or(Guy.schwartz@alaska.gov). From: Trudi Hallett [mailto:thallett@hilcorp.com] Sent: Tuesday, November 10, 2015 2:16 PM To: Schwartz, Guy L(DOA) Cc: Juanita Lovett; Stan Golis Subject: A-04/ Monopod Rig#56 Sundry No. 315-641, PTD: 167-002 Good Afternoon,Guy- I just wanted to give you a heads up with our A-o4 well work progress and our plan forward. We RIH with a burn shoe to mill up the top packer @ 1592'and eventually burned over it,losing weight at 1596'. We added a joint and RIH with BHA to 1632'—all clear.We l/d our burn shoe BHA and picked up our overshot to latch the packer.We RIH with the overshot and did not tag up until 1825'. Appears the integrity of the pipe below the top packer was non-existent.We 1/d the overshot and picked up a flat btm mill to try and "push"the fish down further. We were unable to make any hole passed the 1825'depth.We then picked up our CO assy and RIH to 1825'and made our clean out run.We RU Eline and made a GR run to correlate on depth and in order to determine where we can set our CIBP. Our initial plan was to set the plug at±2,000'to give us plenty of rat hole to work with. Our bottom most perf is proposed 1,796'—so we are still able to get to that zone with our current conditions.The CIBP will be set tea ±1,82o'.Since this depth is higher that was proposed in the sundry—we wanted to give you a heads up.We feel this will be a much better approach than trying to mill/fish the remainder of the packer/tbg from the wellbore. Let me know if you have any concerns with the above plan. I have attached the approved Sundry for your reference. Thank you! 1 • • Trixot-i. Trudi Hallett I Operations Engineer Cook Inlet Offshore Asset Team I Hilcorp Alaska,LLC Hilcorp A Company Built on Energy thallett@hilcorp.com 0: 907.777.8323 C: 907.301.6657 2 Ati ®FT� �w ' i �V/7,�,v THE STATE Alaska Oil and Gas =� te pfLAsKA Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 w h." OF ;I. Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Trudi Hallett SEAMED M V 0 220-- Operations Engineer Hilcorp Alaska, LLC 1 t 7 - 0.6( .. 3800 Centerpoint Drive, Suite 1400 (P Anchorage, AK 99503 Re: Trading Bay Field, Undefined, Middle Kenai B and C Oil Pools, Trading Bay St A-04 Sundry Number: 315-641 Dear Ms. Hallett: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this z6 day of October, 2015 Encl. RBDMS 4CT 3 0 2015 . • SRECEIVED STATE OF ALASKA OCT Q 9 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION �� APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1.Type of Request: Abandon El Plug Perforations El Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown ❑ Suspend❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well ❑ Other: Run G/L Completion 0 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska,LLC ' Exploratory ❑ Development 0, 167-002 ' 3.Address: 3800 Centerpoint Drive,Suite 1400Stratigraphic CI Service ❑ 6.API Number: Anchorage,AK 99503 50-733-20001-00 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? CO 93B Will planned perforations require a spacing exception? Yes El No 0 J Trading Bay St A-04 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0018731 • Trading Bay Field/Undefined Oil,Middle Kenai B Oil&Middle Kenai C Oil Pools i 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth ND(ft): Plugs(measured): Junk(measured): 10,609 4 10,491 , 3,306 , 3,241 3,360 3,306 Casing Length Size MD ND Burst Collapse Structural Conductor Surface 1,077' 13-3/8" 1,077' 1,075' 3,090 psi 1,540 psi Intermediate Production 6,370' 9-5/8" 6,370' 6,281' 3,950 psi 2,570 psi Liner Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 1,660-3,404 ' 1,643-3,336 2-7/8" 6.4#/N-80 2,597 Packers and SSSV Type: Packers and SSSV MD(ft)and ND(ft): Otis VST Pkr,Baker SC-1 Pkr,Baker Model D Pkr&Otis Ball Valve 1,592'(MD)1,576'(TVD)/2,596'(MD)2,552'(TVD)/3,180'(MD)3,118'(TVD) &299'(MD)299'(ND) 12.Attachments: Description Summary of Proposal 0 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic❑ :velopment 0• Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 10/23/2015 OIL 04 WINJ ❑ WDSP❑ Suspended El 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOD SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Trudi Hallett Email thallettAhilcorp.com Printed Name Trudi Hallett Title Operations Engineer lia Lelif Signature llAitaCtPhone (907)777-8323 Date 10/9/2015 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 315 - 1qt Plug Integrity ❑ BOP Test I Mechanical Integrity Test ❑ �^Loccation Clearance/ Cl Other: / Sops Lei L P tr (MAS 1 6 '3 1 io:,..) -A- /';,) :-N 5,Z--g.Atrxi. 5, , RBpMs aCj 3 0 iol5 Spacing Exception Required? Yes ❑ No Illa Subsequent Form Required: /b--`tog APPROVED BY l� / a I / Approved by. COMMISSIONER THE COMMISSION Date: / / ro/14/5- ORIGINAL1O /C,� b 6 ,6 Submit Form and Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • S Well Work Prognosis Well: A-04 Hilcorp Alaska,LLC Date: 10/9/2015 Well Name: Monopod A-04 API Number: 50-733-20001-00 Current Status: Water Injector Leg: N/A Estimated Start Date: 10/23/2015 Rig: Monopod Platform Rig#56 Reg.Approval Req'd? 10-403 Date Reg.Approval Rec'vd: Regulatory Contact: Juanita Lovett 777-8332 Permit to Drill Number: 167-002 First Call Engineer: Trudi Hallett (907)777-8323 (0) (907) 301-6657 (M) Second Call Engineer: Ted Kramer (907)777-8420(0) (985)867-0665 (M) AFE Number: Current BHP: 1261 psi @ 2702' TVD/2752' MD Max. Exp'd BHP: 803 psi @ 1721' TVD/ 1740' MD Max Anticipated Surface Pressure(MASP): 631 psi✓ Using 0.1 psi/ft gradient 20 AAC 25.280(b)(4) Brief Well Summary A-04 is a shut-in Middle Kenai Oil Pool producer drilled and completed in 1967.This well was shut in in 1998 and has been offline since.This workover will be recompleting to uphole Middle Kenai sand in the Undefined "A" Pool. Will pull the current completion and run new 3-1/2"gas lift completion. Procedure: 1. Skid rig and RU over A-04. 2. Notify AOGCC 48 hours before pending ROPE test. Set BPV, ND tree, NU BOPE. Test all BOP equipment per AOGCC guidelines and Hilcorp BOPE testing procedures to 250 psi LOW and 2500 psi HIGH. 3. Pull hanger up to floor height, pulling seals from seal bore assy,CBU. POOH laying down tubing. 4. RU E-line. Cut tubing just below packer at±1,610'. POOH. 5. RIH with Packer retrieving tool, latch into same and POOH. 6. RIH with overshot extension and make outside cut @±2,100'. 7. RIH w/overshot and latch onto tbg fish, POOH. LD same. 8. PU 3-1/2"WS w/9-5/8" bit/scraper to±2,000'. POOH. 9. RIH w/9-5/8" CIBP and set at±2,000'. 10. Pressure test backside to 1,500 psi to confirm casing integrity. Hold for 30 minutes, record with a chart recorder. *The following cement procedure is to set up for a future perf add in the 23-A Sand. The CBL indicates there is little to no cement behind pipe at this depth and a block squeeze just above this interval (1,577'-1,618' MD) may be necessary. i1. PU and RIH w/perf guns and perforate ±1550'-±1552'. POOH w/perf guns. 12. RU Cementing equipment. Pump a block squeeze thru perforations. PU above top shot, clean up Ce" cement, POOH w/WS.WOC. Pressure test squeeze perfs to 1500 psi and chart. 13. PU 9-5/8" storm packer, RIH and set same at ±200' and hang off string. Pressure test to 1,500 psi and chart. 14. Release from storm packer, POOH. Replace tubing head. 15. Test all flange breaks to 1,500 psi and chart. �- ( cL' k J°a,vs 1� - s-t-- asp 16. RIH, engage storm packer, release same, POOH, LD storm packer. 17. RIH with 3-1/2" completion, setting packer at±1,500'. 1 -> C. - lam; ®zc�va t 14 • S Well Work Prognosis Well: A-04 Hilcorp Alaska,LLC Date: 10/9/2015 18. Test to 1500 psi charting for 30 min. 19. ND BOPE, NU wellhead and test. 20. RU Wireline to swab well down and perforate the 25-A sand as per proposed program. 21. POOH w/perf guns and RD E-line. - /J'Iv -(7/c, c, I 22. Turn well over to production Attachments: 1. Current Well Schematic 2. Proposed Well Schematic 3. Current Wellhead Diagram 4. Proposed Wellhead Diagram 5. BOP Stack • • Trading Bay Unit Well#A-4 1 Completed 3/11/91 CASING AND TUBING DETAIL RKB to TBG Hngr=41.20' SIZE WT Grade Conn. ID Top Btm. Tree connection:3" 5,000# A 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' B 9-5/8" 404&43.5 J-55&N-80 Butt 8.681 Surf 6370 ° - 1 Tubing: 2-7/8" 6.4 N-80 Butt 2.441 0' 2597' 2 JEWELRY DETAIL NO. Depth ID Item 41.20 CIW 11"X 2-7/8"EUE 8rd Tbg.Hanger. 1 299' 2.313 Otis 2-7/8"SVLN 3 2 1053' 2.441 2-7/8"Daniels PSI-DSO GLM 3 1520' 2.441 2-7/8"Daniels PSI-DSO GLM 4 1558' 2.313 Otis 2-7/8""XA"Sive 5 1589' 2.441 Otis Straight Slot Locator w/11'of seals. ° 4 6 1592 3.88 Otis"VST"Versa-Trieve Pkr. . 5 7 1608' 3.88 Otis seal bore extension,9.49'length 6 — 1592' — 7 8 1609' 2.44 Crossover to 2-7/8"BTC 8 IA 9 2532' 2.313 Otis"XA"Sliding Sive 10 2564' 2.313 Otis"X"Profile Nipple 1640'.642' oRena estedtorfs 600p695 11 2596' 3.00 Baker"S-22"Locator Seal Assy. 190-47 on310 12 2596 4.75 96A4-47 SC-1 Gravel Pack Packer 9 1820.822' 13 2601' 4.75 Model"S"GP Ext.w/Sldg Sive w/Lwr ext. ° 14 2632 4.408 80.73'of 5"Blank Liner 2104'-2160' — 2176'-2160 15 2712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 — 16 3160' 2.875 0-ringSeal Sub 11 = 2265'-2370' 121. 2596' 17 3161 4.408 Lwr Tell Tail Screen. 17.61' 18 3179' 3.00 Snaplatch seal assy. 190-47 13 19 3180' 4.75 194-47 Model"D"Sump Pkr. • 14 - -2752'-2770' FISH: _2810'-2830' B Drilled Mod"D"Pkr. 3/5/90 @ 3441' 2899'-2935' Sands 15 — Drilled Retainer 3/8/90 @ 3306' 3005-3030' FILL =3100'-3150' 16 Tagged w/2.5"Scratcher 3/29/91 @ 3375' WLM 17 18 PERFORATION DETAIL 19 > :11 1114>< 3180' Zone Top Btm Amount SPF Date Persent Condition 31-8 2,752' 2,770' 18' 8 3/9/1990 Open f/ Prod. 31-8 2,810' 2,830' 20' 8 3/9/1990 Open f/Prod. L —( 3306' 33-6 2,897' 2,935' 38' 8 3/9/1990 Open f/Prod. I 3360' 41-3 3,005' 3,030' 25' 8 3/9/1990 Open f/Prod. ,A 1 41-8 3,055' 3,150' 95' 8 3/9/1990 Open f/Prod. / 3437' 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd KB ELEV=101' 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd TD=10604' PBTD=3360' 24-6 2,104' 2,160' 56' 2' 9/27/1994 Open f/ Prod. MAX ANGLE thru INTERVAL=15.45° 24-6 2,176' 2,204' 28' 2 9/27/1994 Open f/Prod. 26-7 2,285' 2,370' 85' 2 9/27/1994 Open f/Prod. • PROPOSED . Trading Bay Unit Well #A-4 Completed: Future RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000#i I SIZE WT Grade Conn. ID Top Btm. 1 A 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' nit i B 9-5/8" 40#&43.5 J-55&N-80 Butt 8.681 Surf 6370 Tubing: 2 3-1/2" 9.2 L-80 SuperMax Surf ±1,525' • 2-7/8" 6.4# N-80 Butt ±2,100' 2,597' 3 sty''' 5 4 6 JEWELRY DETAIL NO. Depth IDItem a1640'-642' 41.20 Hanger Sqzd Pers 16660'-1695 1 ±300' SSSV oron as tested to 500psi, 3/18FJ0 2 ±1,000' GLM ±1,740'11,796' 3 ±1,490' Chemical Injection Mandrel 4 ±1,500' Packer 1820'-822' 5 ±1,520' X-Nipple 6 ±1,525' WLEG _ 2O '> G i 6P 7 ±2,000' CIBP 8 2532' 2.313 Otis"XA"Sliding Sive 2104'-2160' 9 2564' 2.313 Otis"X"Profile Nipple = 2176-2204' 10 2596' 3.00 Baker"S-22"Locator Seal Assy.190-47 7 11 2596 4.75 96A4-47 SC-1 Gravel Pack Packer - 2285-2370' 12 2601' 4.75 Model"S"GP Ext.w/Sldg Sive w/Lwr ext. 8 13 2632 4.408 80.73'of 5"Blank Liner ■ • 9 14 2712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3160' 2.875 0-ring Seal Sub 11 >I2596' 16 3161 4.408 Lwr Tell Tail Screen.17.61' 12 17 3179' 3.00 Snaplatch seal assy.190-47 18 3180' 4.75 194-47 Model"D"Sump Pkr. 13 2752•-2770' =2810•-2830' FISH: EE 2899'-2935' 14 - Drilled Mod"D"Pkr. 3/5/90 @ 3441' 3005-3030' Drilled Retainer 3/8/90 @ 3306' =3100'-3150' r 15 FILL 16 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM 17 18 2il Ir>-‹ 3180' • 3306' PERFORATION DETAIL 3360' Zone Top Btm Amount SPF Date Persent Condition AZN25A ±1740 ±1796 ±56 Proposed 3437' 31-8 2,752' 2,770' 18' 8 3/9/1990 Open f/ Prod. 31-8 2,810' 2,830' 20' 8 3/9/1990 Open f/ Prod. KB ELEV=101' 33-6 2,897' 2,935' 38' 8 3/9/1990 Open f/ Prod. TD=10604' PBTD=3380' MAX ANGLE thru INTERVAL=15.45° 41-3 3,005' 3,030' 25' 8 3/9/1990 Open f/ Prod. 41-8 3,055' 3,150' 95' 8 3/9/1990 Open f/ Prod. 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Open f/ Prod. 24-6 2,176' 2,204' 28' 2 9/27/1994 Open f/ Prod. Updated: 10/09/15 by1LL • Anopod Platform . II A-4 Current 10/09/2015 11ihi uI, th14k,..ILL( Monopod Platform Tubing hanger,CIW-DCB- A-4 FBB,11 3M X 2 7/8 EUE 8rd 13 3/8 X 9 5/8 X 2 7/8 lift X 2 7/8 EUE bottom, w/2 1/2"type H BPV profile, 1/8 non cont control line port in hanger,6'A neck BHTA,2 9/16 5M FE X 3" Bowen Quick Union I Valve,Safety,Willis C-20, II. 2 1/16 5M FE .� m 1 ' il I- Tree asst',block,CIW-F, single master and swab, � A _ airi 11 3M X 2 9/16 5M X 2 1/16 5M,prepped onii.. � '11/��I � . 11 . 6'/4 EN pocket,%4 npt control line exits r ' �� c I 111 W 1111 dill I , I 11: x= Tubing head,CIW-DCB, 111 Ii it, ) 13 5/8 3M X 11 3M, Valve,CIW-F,2 1/16 5M FE, w/2-2 1/16 5M SSO, _i, ,-,1 HWO,AA X-bottom prep i' a ' 011I-4 0 ) Iti4-27,0 ,! y,iiii.ar. i;._ 111 I Uhlir'u w: Casing head, 111 rShaffer KD, IN 13 5/8 3M X 1111 13 3/8 SOW,w/2-2" 9 2' LP CIW ball valve LPO, ISI CI:; Ill-I.'. • • iiiMonopod Platform A-04 Proposed 10/09/2015 Ilik•arp Ua4kn.IJ.i. Monopod Platform Tubing hanger,SME-CL,11 X A-4 3 34 EUE lift and susp,w/3" 13 3/8 X 9 5/8 X 3 1/2 Type H BPV profile,2-3/8 CCL,Alloy material BHTA,Bowen,3 1/8 5M X 2.5 Bowen quick union II in S in 1111 1.1-111 Valve,Swab,WKM-M, 3 1/8 5M FE,HWO,DD trim ifile -,. "4 Valve,Wing,WKM-M,3 1/8 (j 5M FE,w/15"OMNI 1111.10 Valve,Wing,WKM-M,2 1/16 "'' "' operator,DD trim 5M FE,HWO,DD trim : \ ' 111:::i ilm.01 op u'1 .n Valve,Master,WKM-M, , 3 1/8 5M FE,HWO,DD trim 6 Is,Ong... ant n�°Mru, 1": Valve,Master,WKM-M, .. • 3 1/8 5M FE,HWO,DD trim �1 . III III i _ .'IN'''1 is Ili head,S-8,13 5/8 3M - Mill—,.I _ tini_•1= /� x 11 5M,w/2-2 1/16 5M �V/ ZO M WKM-M F. i � ., is valves II . 04-, C147_1111 _ 1-i- IF Illi , ILII fi • Casing head, Shaffer KD, __ 135/83MX 111 .2 1i 13 3/8 SOW,w/2-2" 2"LP CIW ball valve LPO, IMS I 1:,1 6-1.:' C • . ii Monopod Platform 2015 BOP Stack 10/09/2015 Hilt-HT %lask;i.1.11 • iii fit fli111 11 11 Annular Preventer Shaffer Spherical 13 5/8 5M FE X 13 5/8 5M stdd top Shaffer 3.74' 13 5/8 5M Ill Ill tit 1!i Double gate =� Sh r SL _, — 2 7/8 x 5.5 variable Shaffer SL P. -- 13 5/8 5M stdd X stdd 2.83' 10"operators �_ Blind * Mud Cross III III I I I III III 135/85MFEXFE i 1.r ! � ; w/3 1/8 5M EFO t . 'in w/2 1/16 5M Choke and Kill �� �� 1' •4 " ; ! - = 1' 2.00' valves w/Unibolt end �♦ 1 l 1 I l 1 I l I I l I III connections for lines 1.11111111111 Ili 'IW!PIm' 1 1 i Il __ . Riser 13 5/8 5M Flange X 13 5/8 5M Flange 14.20' I 1 I I11 Crossover spool 13 5/8 5M X 11 3M RECEIVE* PROPOSED • Trading Bay Unit Well #A-4 OCT 2 9 2015 Completed: Future AOGCC RKB to TBG Hngr=41.20' CASING AND TUBING DETAIL Tree connection:3" 5,000# SIZE WT Grade Conn. ID Top Btm. 1 A 13-3/8" 61.0 K-55 Butt.LT&C 12.515 Surf 1077' B 9-5/8" 40#&43.5 1-55&N-80 Butt 8.681 Surf 6370 Tubing: i; iii 2 i\ 3-1/2" 9.2 L-80 SuperMax Surf ±1,525' 2-7/8" 6.4# N-80 Butt ±2,100' 2,597' 1 3 ZE.I 5 4 ow 6 JEWELRY DETAIL e s=o'"=,z5==' NO. Depth IDItem 9 1640'-642' 41.20 Hanger Sgzd Peo '-1695' 1 ±300' SSSV on 3/18/90 d t16o SO60Opsi, 2 ±1,000' GLM ,1 7ao'-,796' 3 ±1,490' Chemical Injection Mandrel 4 ±1,500' Packer 820'-822' 5 ±1,520' X-Nipple 6 ±1,525' WLEG -1114111P ___ - 7 ±2,000' CIBP 8 2532' 2.313 Otis"XA"Sliding Sive 2104'-2160' 9 2564' 2.313 Otis"X"Profile Nipple = 2176'-2204' 10 2596' 3.00 Baker"S-22"Locator Seal Assy.190-47 = 11 2596 4.75 96A4-47 SC-1 Gravel Pack Packer 7 2285'-2370' 12 2601' 4.75 Model"S"GP Ext.w/Sldg Sive w/Lwr ext. 18 13 2632 4.408 80.73'of 5"Blank Liner ■ ■ 9 14 2712' 4.408 14 jts[447.9']of Wire Wrap Screen,0.012 gage 10 15 3160' 2.875 0-ring Seal Sub 11 >-<1 2596' 16 3161 4.408 Lwr Tell Tail Screen.17.61' 0 17 3179' 3.00 Snaplatch seal assy.190-47 12 18 3180' 4.75 194-47 Model"D"Sump Pkr. L 13 2752'-2770' 26,0'-2630' FISH: -2899'-2935' 14 Drilled Mod"D"Pkr. 3/5/90 @ 3441' • =3005'-3030' Drilled Retainer 3/8/90 @ 3306' -3100'-3150' 15 FILL 16 Tagged w/2.27 GR,sticky paraffin 8/31/2015 @ 1576' WLM rr- 17 18 1" .11 3180' 3306' PERFORATION DETAIL -- 3360' Zone Top Btm Amount SPF Date Persent Condition ' f AZN25A ±1740 ±1796 ±56 Proposed 3437' 31-8 2,752' 2,770' 18' 8 3/9/1990 Open f/ Prod. 31-8 2,810' 2,830' 20' 8 3/9/1990 Open f/ Prod. KB ELEV=101' 33-6 2,897' 2,935' 38' 8 3/9/1990 Open f/ Prod. TD=10604' PBTD=3360' MAX ANGLE thru INTERVAL=15.45° 41-3 3,005' 3,030' 25' 8 3/9/1990 Open f/ Prod. 41-8 3,055' 3,150' 95' 8 3/9/1990 Open f/ Prod. 24-A 1,660' 1,695' 35' 4 3/4/1990 Cmt Sqzd 44-7 3,382' 3,404' 22' 4 3/4/1990 Cmt Sqzd 24-6 2,104' 2,160' 56' 2' 9/27/1994 Open f/ Prod. 24-6 2,176' 2,204' 28' 2 9/27/1994 Open f/ Prod. Updated: 10/28/15 by1LL • • RECEIVED Juanita Lovett 9 2015 From: Trudi Hallett AOGCC Sent: Wednesday, October 28, 2015 10:57 AM �"A To: Guy Schwartz (guy.schwartz@alaska.gov) Cc: Dan Marlowe;Juanita Lovett Subject: FW: TBU A-04 RWO (PTD 167-002)' Attachments: A-04_CBL_041867.pdf;A-04 Schematic_PROPOSED_2015-10-28.rtf Guy- Here is my note I sent you Monday. Please let me know if you need add'I information.We have crews heading out to the Monopod tomorrow. Thanks- Tru,osi, From: Trudi Hallett Sent: Monday, October 26, 2015 2:52 PM To: 'Schwartz, Guy L (DOA)' Subject: RE: TBU A-04 RWO (PTD 167-002) Yes this cement Job is planned—the perforation part of this section will be something we add later with a separate sundry if we get isolation. Thanks- From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Monday, October 26, 2015 1:18 PM To: Trudi Hallett Subject: TBU A-04 RWO (PTD 167-002) Trudy, Looking at the sundry for RWO on A-04. Can you forward me the CBL data 9 5/8" casing from 1400—2000 ft. Is the proposed cement sqz a contingency or planned? Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended 1 recipient of this e-mail,please delete it,wout first saving or forwarding it,and,so that theGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226) or(Guy.schwartz@alaska.gov). 2 Ralph P. Holman Engineer Technician Unocal P.O. Box 196247 Anchorage, Alaska 99519-6247 November 23, 1994 Mr. Russ Douglas Commissioner Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Dear Mr. Douglas: ~~ ~_~."~ ~.' On Septembe~ 27, 1994 the following intervals were perforated ia well ^4 (APl 50-733-20001-00) on the Monopod platform in Trading Bay Field: BENCH .TOP {MD) BOTTOM (MD) FEET 24-6 2104 2160 / 56 24-6 2176 2204 28 27-6 2285 2370 85 TOTAL 169 RECEIVED APR 2 0 199,5 Oil & Gas Cons. Commission Anchora~," ~ STATE OF ALASKA ALA A OIL AND GAS CONSERVATION )MMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Puli tubing Alter casing 2. Name of Operator Unocal 3. Address P.O. Box 196247 Anchorage, Alaska 99519-6247 4. Location of well at surface 1611' N, 558' W from SE Cor., Sec. 4 TgN, R13W, SM At top of productive interval 75' N, 149' W from Surface Location At effective depth 202' N, 573' W from Surface Location At total depth 170' N, 653' W from Surface Location __ Plugging __ Perforate X_ Repair well __ Pull tubing ~ Other__ 5. Type of Well: Development X_ Exploratory __ Straflgmphi~ ~ 6. Datum elevation (DF or KB) KB: 101' 7. Unit or Property name Trading Bay Field 8. Well number A-4 feet 9. Permit number/approval number 67-2 10. APl number 50-733-20001-00 11. Field/Pool Trading Bay/Tyonek "B' 12. Present well condition summary Total depth: measured true vertical 10609 10491 feet Plugs (measured) feet Effective depth: measured 3510 true vertical 3437 feet Junk (measured) feet Casing Length Structural Conductor Surface 1077' Intermediate Production 6370' Uner Perforation depth: measured Size Cemented Measured depth 13-3/8" 1200 sx 1077' 9-5/8" 1175 sx 6370' 1660-1695, 2104-2160, 2176-2204, 2285-2370, 3382-3404 True vertical depth 1075' 6281' true vertical 1642-1677, 2078-2132, 2148-2175, 2252-2334, 3315-3336 Tubing (size, grade, and measured depth) 2-7/8", 6.4#, N-80 @ 3317' Packers and SSSV (type and measured depth) 13, Stimulation or cement squeeze summary Baker "FH" pkr. @ 1540'& Baker 'D' pkr. Otis SSSV @ 281' Intervals treated (measured) APR 2 0 1995 Treatment description including volumes used and final pressure Naska Oil & Gas Cons. Commission Anchora~;~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 22 37 0 280 59 58 5 420 Tubing Pressure 100 180 15. Attachments Copies of Logs and Surveys run__ Daily Report of Well Operations m 16. Status of well classification as: Oil X_ Gas ~ Suspended Service 17. I her~i'qy certify Signed. ~~ Form 10-404 Rev he~nd correct to the best of my knowledge. 06/15/88 SUBMIT IN DUPLICA.~. 11 :i'Y~e of request: Abandon --. , '...,penal__ Aiter oasing~ Repair well Change approved program __ 2. Name of Operator Pull tubing __ Varlanoe __ 5. Type of Well: Service__ Operatione shutdown __ Re-ent~,.."~pended well__ ~ugging ~ Time e~en~ion ~ Stlmul~e ~ Perforate Other - 6. Datum elevation (DF or KB) Unocal 3. Address P.O. Box 196247 Anchorage, Alaska 99519-6247 4. Location of well at surface Monopod Platform, Conductor 23 1611' N, 558' Wfrom SE Cor., Sec. 4, T9N, R13W, SM At top of productive interval 75' N, 149' W from Surface Location At effective depth 202' N, 573' W from Surface Location At total depth 170' N, 653' W from Surface Location KB: 101' 7. Unit or Property name Trading Bay Field 8. Well number A-4 9. Permit number 67 -2 10. APl number 50-733-20001-00 11. Field/Pool Trading Bay/'ryonek "B" feet 12. Present well condition summary Total depth: measured true vertical 10609 10491 feet feet Effective depth: measured 3510 feet true vertical 3437 feet Plugs (measured) 6200 Junk (measured) ORIGINAL Casing Length Size Cemented Structural Conductor Surface 1077' 13-3/8" 1200 sx Intermediate Measured depth 1077' True vertical depth 1075' Production 6370' 9-5/8" 1175 sx Liner Perforation depth: measured 1660-1695, 3382-3404 6370' 6281 RECEIVED 13. 14. 16. true vertical 1642-1677,3313-3334 - 7 1994 Tubing (size, grade, and measured depth) 2-7/8", 6.4#, N-80 @ 3317' ~t~$ka u. & Gas Cons. C0mmJss! Packers and SSSV (type and measured depth) Baker 'FH' pkr. @ 1540' & Baker 'D' pkr. @ 3262'. Anchorage Otis SSSV @ 281' Attachments Description summary of proposal, _ Detailed operations program, _ BOP sketch _ Questions? Call John Paul McKee @ 263-7680 or Ralph Holman @ 263-7838 Estimated date for commencing operation 5. Status of well classification as: September 11, 1994 If proposal was verbally approved Oil,. Gas _ Suspended _ Name of approver Date approved Service .!l .igned l~J.~~ 7' I her~y~C[l~hat the f°reg°ing is true and correct to ~le~V~/(~r t ~{ 1/[~/~/~/,the best of, my .kpowledge. FOR COMMISSION USE./ONL~ Conditions of approval: Notify Commission so representative may witness Plug Integrity _ BOP Test Location clearance Mechanical Integrity Te~.__ S-'~bsequent form required 1-~- IApproval I~, .. ~ (/ Approved by the order of the Commission Form 10-403 Rev 06/15/88 Original Signe0 By 13~vid W ._lohn. sto~ Commissioner Approved Copy Returned ..... ,7 - ~--~¥ Date ~/"'P/~P V SUBMIT I1~ TRIPLICATE Unocal North American Oil & Gas Division Unocal Corporation P.O. Box 190247 Anchorage, Alaska 9951c., 47 Telephone (907) 276-7600 UNOCAL Alaska Region Ralph P. Holman Engineer Technician Unocal P.O. Box 196247 Anchorage, Alaska 99519-6247 August 24, 1994 Mr. Russ Douglas Commissioner Alaska Oil & Gas Conservation Commission 3001 Porcupine Drivo Anchorage, Alaska 99501-3192 Dear Mr. Douglas: This is to inform you of Unocal's intent, upon your approval, to perforate tho following intervals in woll A-4 (API# 50-733-20001-00) on tho Monopod platform. BENCH Top (MD) BO'rTOM 0VID) FEET 24-6 2104 2160 56 24-6 2176 2204 28 27-6 2285 2370 85 TOTAL 171 Sincerely, RECEIVED SEP - 7 1994 Alaska 0il & Gas Cons. Commission Anchorage August 24, 1994 Monop0d Platform, Well A-4 Perforating Procedure 1. Hold safety meeting. 2. Rig up electric line unit. . Pressure test lubricator to 2500 psi for five minutes. Note: A pump-in sub with a valve is required. 4. Shut down all welding and radio transmissions. . Run in hole and perforate intervals as instructed by Unocal wire.ss. (When gun is 200' below surface, welding and radio transmissions may resume.) . Pull out of hole. (When gun is 200' below surface, shut down all welding and radio transmissions.) 7. Repeat steps 5,6 and 7 as needed to perforate the following intervals: BENCH INTERVAL FEET 24-6 2,104-2,160 56 24-6 2,176-2,204 28 27-6 2,285-2,370 85 TOTAL: 171 RECEIVED SEP - 7 1994 Alaska Oil & Gas Cons. Commission Ancflora~e STATE.'OF ALASKA "'~' ALASKA OIL AND GAS CONSERVATION COMMISSION ' ' REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate ~ Plugging __ Perforate ~ Pull tubing __ Alter casing __ Repair well __ Pull tubing ~ Other 2. Name of Operator 5. Type of Well: 6. Union Oil Company of Calif. (UNOCAl) Development X Exploratory __ 3. Address Stratigraphic_ 7. P.Oo Box 190247 Anch,, At(. 99519-0247 Service__ 4. Location of well at surface Monopod Platform Conductor ./,/'23 8. 1611' N & 558' W F/SE corn., Sec. 4, T9N, R13W, S.M. At top of productive interval 2752' MD, 2701' TVD 9. 1746' NSL & 963' WEL Sec. 4, T9N, R13W, S.M. At effective depth 3360' MD, 3291' TVD 1800' NSL & 1098' WEL Sec. 4, T9N, R13W, S.M. At total depth 10609' MD, 10491' TVD 1781' NSL & 1211' WEL Sec. 4, T9N, R13W, S.M. 12. Present well condition summary Total depth: Plugs (measured) Datum elevCtion (DF or KB) LMS RT 101' above Unit or Property name Trading Bay Field Well number TBS ~.,'?- 4 Permit number/approval number 67-2 / 90-004 measured 10609 feet true vertical 10491 feet 10. APl number 50-- 733-20001 11. Field/Pool Tyonek "B" zone feet Effective depth: measured 3360 feet Junk(measured) true vertical feet 3291 Casing Length Size Cemented Structural Conductor Surface 1077 ' 13-3/8" 1200 sx Intermediate Production 6370' 9-5/8" 1175 sx Liner Perforation depth: measured See Attached true vertical Tubing (size, grade, and measured depth) 2-7/8", N-80, Baker Mod Packers and SSSV (type and measured depth) Measured depth True vertical depth 1077' 1075' 6370' 6281' RF..CEIV D MkR 2 7 1991 6.4-/,/ at 2596 "D" at 3180' Baker Mod "SC-i" at 2596' Otis "VST" at 1592' and SSSV at 299' 13. Stimulation or cement squeeze summary Intervals treated (measured) See History Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation "15. Attachments Copies of Logs and Surveys run __ Representative Daily Average Production or InjeCtion Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Not available Tubing Pressure 16. Status of well classification as: Daily Report of Well Operations _..x Oil ~ Gas __ 'i7. I h~reby certify th,a~e foreg°ir;g is true and correct to the best of my knowledge. Gary~--~/~-' ~' ~)~ Regional Signed - ~_~t~ Title Form 10-404 Rev 06/15/88 Suspended __ Service Drilling Manager Date~ --- Z.~ -~J ~ SUBMIT IN DUPLICATE 1077' BAKER WELD SCREEN GRAVEL PACK 20-40 MESH OTI'AWA SAND 146 CU.FT. IN PLACE 9-5/8- 4o& 43.5# N-80 & J-55 6370' ] 1 J2 J 3 5 8 'JJJJJJJjJj~ 7 TUBING DETAIL 2-7/8", 6.4#, N-80 TBO BT&C. 1) OTIS BALL VALVE AT 299' 2) GLM's AT 1520' & 1053' 3) OTIS XA SLV AT 1558' 4) OTiS '9/ST" PACKER AT 1592' 5) OTIS XA SLV AT 2528' 6) OTiS "X" NIPPLE AT 2562' 7) BAKER SC-1 PACKER AT 2596' 8) 5", 15#, J-55 STAIN LESS STEEL WIRE WRAPPED SCREEN .012" 9) BAKER MOD "D" PKR AT 3180' CEMENT SQUEEZE 1660'-1695' "B" ZONE INTERVAL 2752'-2770' 2810'-2830' 2897'-2935' 3005'-3030' 3O55'-3150' CEMENT RETAINER AT 3360' ETD CEMENT SQUEEZE 3382'-3404' JUNK ~ 3510' WELL TBS A-4 PRODUCER WELL SCHEMATIC UNION OIL COMPANY OF CALIFORNIA (dba UNOCAL) DRAWN: CLL SCALE: NONE DATE: 03-24-91 Monopod Platform Trading Bay State Field A-4 Perforation Record 03-'24-91 Open for production: Measured Depth 2752'-2770' 2810'-2830' 2897'-2935' 3005'-3030' 3055'-3150' Squeezed with cement: Measured Depth 1660'-1695' 3382'-3404' True Vertical 2701'-2719' 2757'-2777' 2842'-2878' 2946'-2970' 2995'-3087' True Vertical 1642'-1677' 3313'-3334' Footage 18' 20' 38' 25' 95' Footage 35' 22' LEASE TRADING BAY UNOCAL DRILLING ..~CORD ALASKA REGION PAGE NO. 1 of WELL NO. A-4 FIELD TRADING BAY STATE DATE E.T.D. 02/28/90 03/01/90 3309' 03/02/90 03/03/90 03/04/90 03/05/90 3437' DETAILS OF OPERATION. DESCRIPTIONS & RESULTS Moved to slot #23 Well A-4 and rigged up Arctic recoil (API) unit. Pressure tested all surface equipment to 3,000 psi. RIH with 1-1/4" coiled tubing and tagged fill at 1563' Clean out fill to 3309' CTM. CBU, We~l stable, POOH. Make up wash nozzle assembly. Let hole stand four hours. Pump down tubing with rig pumps at 1 BPM and 150 psi that bled to zero rather quick, continued to pump at same rate until 335 bbls pumped and pressure increased to 450 psi. Shut down. RIH with CTU, tagged and cleaned out fill from 3285'-3309'. CBU. Well on slight vacuum. Installed BPV's, removed tree and installed BOPE's. Install and test BOPE. Pull BPV, rig up Arctic recoil and RIH with 1-1/4" coiled tubing. Tagged fill at 3310'. Clean out to 3315', CBU twice. POOH. Rig up Myers wireline and RIH and close XA sleeves at 1581' and 3226'. Pressure tubing to 400 psi and held. RIH with CTU and tagged fill at 3215', clean out fill to 3315'. CBU. POOH. Wait two hours. RIH tagged fill at 3260', clean out to 3315'. Fill tubing with high visc polymer pill weighted to 75 pcf. POOH. POOH with CTU and wait two hours, RIH to 3313', Ok. POOH. Rig up Schlumberger and RIH with 2-1/8" jet cutter. Attempted to cut tubing at 3290', negative. Re-run cutter and cut TBG at 3290'. Down Schlumberger. Attempted to displace below PKR with 75 PCF, unable with 1500 psi. RIH and open XA sleeve at 1581'. Release packer with 70M# overpull. CBU through choke and degasser, continues to pack off, reverse circulation large amounts of sand from the annulus. Reverse out sand and spot hi-vis lite plug pill to perforations, well out of balance 400 psi. Bleed casing to equalize well, dead. Unplug chokes and clear lines of sand. POOH, lay down all tubing and equipment. Recovered all tubing to cut at 3290' Change upper pipe rams to 3-1/2", test ~11 BOPE. Set wear bushing. Made up 8-1/2" bit and 9-5/8" casing scraper. Lost (3) slip dies down hole. POOH. Down scraper. RIH with bit and boot sub. Stopped at 1657'. Clean out bridge 1675'-1762', RIH tag fill at 3142' and clean out to 3265'. POOH. POOH. Recovered (2) slip dies from boot sub. Made up Tri-State PRT and RIH. Engage packer model "D" at 3265'. Burn over packer from 3265'-3268' and fell through. CBU and POOH. Made up 60' of 2-7/8" tubing tail and RIH on 3-1/2" DP. Tagged fill at 3441', clean out fill from 3441'-3474'. Unable to clean out deeper. High H2S alarm at shaker, close well. No pressure, no H2S detected with hand held monitor. Circulate clean through choke and degasser. POOH. RIH with 8-1/2" bit and 9-5/8" casing scraper. Tagged junk at 3437'. CBU and POOH. Made up Howco 9-5/8" EZSV retainer and RIH. LEASE: TRADING BAY DATE ETD UNOCAL DRILLING RECORD ALASKA REGION WELL: A-4 FIELD: TRADING BAY STATE DETAIL OF OPERATIONS 03/06/90 1621' 03/07/90 1460' 03/08/90 3306' 03/09/90 RIH WITH 9-5/8" EZSV RETAINER TO 3360'. RIG UP HOWCO AND TEST LINES TO 4000 PSI. ESTABLISHED BREAKDOWN AT 3200 PSI, PUMPED INTO FORMATION WITH 1900 PSI AT 1.5 BPM. MIXED AND PUMPED 75 SX "G" CEMENT WITH .25% HALAD 344, .2% CPF-3, .1% LWL AT 118 PCF (15.8 PPG). FINAL SQUEEZE PRESSURE OF 2500 PSI AT 1.8 BPM. CIP AT 0412 HRS., HELD 1700 PSI WITH PUMPS OFF. UNSTING FROM RETAINER AND LEFT 50 LINEAR FEET ON TOP. POOH. RIH WITH 9-5/8" EZSV RETAINER TO 1740'. MIXED AND PUMPED 111 SX "G" CEMENT WITH .2% CFR-3, .3% HALAD 344 AND 1# CACL. EQUALIZED PLUG 1740'-1422' TO ABANDON "24A" INTERVAL 1660'-1695' DIL. POOH TO 1204' AND RESERVE TUBING CLEAN. BRADENHEAD SQUEEZE 13 BBLS WITH MAXIMUM PRESSURE OF 200 PSI, BLED TO 75 PSI IN 30 MINUTES. CIP AT 1200 HRS. POOH. WAIT ON CEMENT. RIH TO 1050', CBU SLIP AND CUT DRILLING LINE 60'. WOO. TAGGED SOFT CEMENT AT 1621'. WOC. PRESSURE TEST CASING TO 1200 PSI, BLED 200 PSI IN 30 MINUTES. CLEAN OUT SOFT CEMENT 1621'-1650'. WOC. CLEAN OUT FIRM CEMENT 1650'- 1715'. PRESSURE TEST PERFORATION 1660'- 1695' DIL TO 600 PSI, NEGATIVE. AT 325 PSI ABLE TO PUMP I BPM. POOH. RIH WITH TUBING TAIL AND ESTABLISHED INJECTION RATE 1.5 BPM AT 200 PSI, PUMPED 35 BBLS. MIXED AND PUMPED 115 SX "G" CEMENT WITH 2% CACL2, .5% CFR-3, MIXED WITH 3% KCL-FIW AT 15.8 PPG. EQUALIZED PLUG 1712'-1390'. POOH TO 1157' AND BRADENHEAD SQUEEZED 5 BBLS AT 1/4 BPM AND 1400 PSI. SHUT IN FOR ONE HOUR AND FINAL SQUEEZE PRESSURE OF 1250 PSI BLED TO 850 PSI. CIPAT 1330 HRS. POOH. WOC. WOC UNTIL 0330 HRS. CLEAN OUT CEMENT 1460'-1715, CBU. PRESSURE TESTED PERFORATIONS AT 1600'-1695' DIL TO 750 PSI FOR 30 MINUTES, OK. DRILLED RETAINER AT 1742' AND CHASED JUNK TO ETD OF 3306'. CBU. POOH. WOC. RAN GYRO FROM 3300' TO SURFACE. RIH WITH 9-5/8" CASING SCRAPER ON 3-1/2" PH-6 TUBING TO 3306'. BEGIN CLEANING PITS. CONTINUED TO CLEAN MUD PITS. FILTER RESERVE PITS. PUMPED 50 BBLS FIW WITH CAUSTIC SODA, 30 BBLS FIW-HEC WITH 25#/BBL OF 20-40 MESH SAND, 100 BBLS FIW WITH 1% DIRT MAGNET, REVERSE TWO TUBING VOLUMES, LEASE: TRADING BAY DATE ETD 03/09/90 (CONT) UNOCAL DRILLING RECORD ALASKA REGION WELL: a-4 FIELD: TRADING BAY STATE DETAIL OF OPERATIONS PUMPED 20 BBLS FIW-HEC SPACER, FOLLOWED WITH FIW-3% KCL. POOH. MADE UP AND RIH WITH BAKER 7" OD. TCP GUNS ON 3-1/2" TUBING. RIG UP AND TESTED SURFACE EQUIPMENT TO 2500 PSI. RA-~' GR/CCL LOG AND POSITIONED GUNS ON DEPTH. SET PACKER AT 2878' DIE RE- LOGGED AND CONFIRMED DEPTHS. DROPPED FIRING BAR AND PERFORATED "B" ZONE INTERVALS; 2752'-2770'; 2810'-2830'; 2899'-2935'; 3005'-3030'; 3100'-3150'. GUNS FIRED WITH 500 PSI DRAWDOWN AT 8 SPF, 57 GRAM CHARGE, 45 DEGREES PHASING. FLUID LEVEL IN THE ANNULUS BEGIN FALLING AT 1.5 BBL/HR. FLOWED WELL TO PRODUCTION. SHUT-IN WELL FOR 30 MINUTES. LEASE TRADING BAY UNOCAL DRILLING k~CORD ALASKA REGION PAGE NO. 3 of WELL NO. A-4 FIELD TRADING BAY STATE DATE E.T.D. 03/10/90 03/11/90 03/12/90 DETAILS OF OPERATION. DESCRIPTIONS & RESULTS Well SI for 30 minutes and tubing pressure increased from 390 psi to 510 psi. Reverse 70 bbls to production, pull packer loose and circulate system on choke, well stable, rig down equipment and POOH. Lay down guns, negative misfires. Well taking 3 bbls/hr. RIH with 8-1/2"~it and 9-5/8" casing scraper, tagged-fill at 3304', CBU. POOH and perform BOPE test. M & P 46 sxs of sand to 3280'. Spotted sand back to 3216' and POOH. RIH with Baker retreive-a-matic packer and set at 1602'. Pressure test backside to 1000 psi for 30 minutes, ok. RIH and set packer at 1980', injected above the packer at 180 psi and 2 BPM. RIH to 2960' and break circulation, test lines to 5000 psi and set packer at 2960' with tail at 2975'. Established injection rate at 2100 psi and 10 BPM. Pumped 100 bbls of 70# HEC-GEL pre-pad, 50 bbls (163 sx of 20-40 mesh Ottawa sand) at 12 PPG, 36 bbls of 70# HEC-GEL tubing flush. Pressure packed intervals 3150'-3100'; 3030'-3005', at 2100 psi and 10 BPM. Final pressure of 2000 psi at 10 BPM, shut-in at 1025 psi and bled to zero in 2.5 hrs. Released packer and POOH. RIH with O.E. tubing and tagged sand at 3205'. M & P 94 sxs of sand and wait for gel to break. RIH and tagged sand at 2996'. POOH. RIH with 9-5/8" packer and set at 2856' with tail at 2871'. Tested lines to 5000 psi. Established injection rate of 2250 psi at 10 BPM on perfs 2897'-2935. Pumped 50 bbls of 70# HEC-GEL pre-pad, 25 bbls (80 sxs of 20-40 mesh Ottawa sand) slurry at 12 ppg, 26 bbls of after pad 70# HEC-GEL. Final pressure of 2300 psi at 10 BPM. Shut-in at 1600 psi and bled down to 150 psi. POOH with packer. Mixed and pumped 45 sxs of sand, top sand at 2859'. RIH with packer and set at 2705' with tail at 2720'. Established injection rate of 2250 psi at 10 BPM of perfs 2752'-2770'; 2810'-2830'. Pumped same frac as above with final pressure of 2000 psi at 10 BPM. Shut-in for closure at 2400 hrs. LEASE TRADING BAY UNOCAL DRILLING ..~CORD ALASKA REGION PAGE NO. 4 of WELL NO. A-4 FIELD TRADING BAY STATE DATE E.T.D. 03/13/90 03/15/90 03/15/90 03/16/90 DETAILS OF OPERATION, DESCEIpTIONS & RESULTS Released packer and POOH. RIH with O.E. tubing and tagged sand at 2820'. M & P 57 sxs of sand, wait on sand and RIH and tagged at 2723'. POOH. RIH with packer, set at 1926; and pressure test down tubing to 800 psi for 15 minutes, ok. Set packer at 1743' and tested WSO~at 1820'-22' to 600 psi and bled to 145 ps~. Set at 1651' and pressure test perforations at 1660'-95' with 200 psi at 2.6 BPM. Tested backside and WSO at 1640'-42' with 600 psi for 15 minutes, ok. Set packer at 1693' and tested to 600 psi at 5' intervals, found perforations at 1657'-58' DPM leak. RIH to 1740' and obtained injection rate at prefs 1820'-22' with 800 psi at 1 BPM. POOH and LD tail below packer. RIH and set packer at 1723' and obtained injection rate with 800 psi and 1 BPM. M & P 75 sxs of "G" cement with .2% CFR-3, 1% Cacl2, .3% Halad 344 at 15.8 ppg. Squeezed perfs at 1820'-22', final squeeze pressure of 775 psi at 1/4 BPM. CIP at 2200 hrs. 61 sxs in place. Hold pressure and WOC at 2400 hrs. POOH and lay down packer. RIH with 155' of 2-7/8" tubing tail to 1760'. Mixed and pumped 40 sxs "G" cement with .5% CFR-3 and 2% CaCl2 at 15.8 ppg. Equalized plug 1760'-1652'. Reversed out approximately 6 sxs of cement. POOH and WOC. RIH and tagged cement at 1705'. POOH. RIH with 9-5/8" Baker "K-i" retainer and set at 1650' Mixed and pumped 200 sxs "G" cement with 6.5% CFR-3 and 1% CaClz. Final squeeze pressure of 550 psi at 1.5 BPM. Cement in place at 1842 hrs. POOH to 1559. Left 11 cu. ft. cement on top of retainer. Reverse drill pipe clean and POOH. RIH with 8-1/2" bit to 1016' and WOC. RIH and tagged cement at 1635'. Test casing to 600 psi, ok. Clean out cement and retainer at 1650' to 1670'. Attempt to pressure test casing, negative. Perforations at 1675'-58' DPM taking fluid at 1 BPM with 200 psi. POOH. RIH with tubing tail, mixed and pumped 93 sxs "G" cement with 0.5% CFR-3 and 2% CaClz. Equalized plug 1670' to 1412'. Pulled to 1203' and reverse drill pipe clean. Squeezed cement with 7.5 bbls, final squeeze pressure of 500 psi. CIP at 2039 hrs. Held squeeze for one hour. POOH. RIH with 8-1/2" bit to 1020'. WOC. RIH and tagged cement at 1523', test casing to 600 psi, ok. Clean out cement to 1670' and attempt to test perfs at 1657'-70' DPM, negative. POOH. RIH with tubing tail, M & P 93 sxs "G" cement with .5% CFR-3 and 1% CaC12 at 15.8 ppg. Equalized plug 1670'-1412', squeezed cement with 1.5 bbls at 750 psi. CIP at 1709 hrs. WOC. LEASE: TRADING BAY DATE ETD 03/17/90 1415' 03/18/90 2701' 03/19/90 03/20/90 2082' 03/21/90 2573' UNOCAL DRILLING RECORD ALASKA REGION WELL: A-4 FIELD: TRADING BAY STATE DETAIL OF OPERATIONS CLEAN OUT CEMENT 1437'-1670'. TEST PERFORATIONS TO 500 PSI, OK. CLEAN OUT CEMENT TO 1720', ATTEMPT TO TEST PERFORATION,S, 1670'-95' DIL, NEGATIVE. BROKE DOWN WITH 350 PSI AT 0.6 BPM. POOH. RIH WITH TUBING TAIL AND EQUALIZED CEMENT PLUG 1720'-1415' WITH 111 SX. SQUEEZED CEMENT WITH I BBL. CIP AT 1604 HRS. PERFORM BOPE TEST. WOC. CLEAN OUT CEMENT 1434'-1600'. TEST CASING TO 600 PSI, OK. CLEAN OUT CEMENT TO 1720' AND TEST PERFORATIONS TO 500 PSI FOR 30 MINUTES, OK. CLEAN OUT CEMENT TO 1830' AND TEST PERFORATIONS 1820'-1822' TO 500 PSI FOR 30 MINUTES, OK. RIH AND TAGGED TOP OF SAND AT 2701'. CIRCULATED CLEAN AND CONDITION MUD. CLEAN MUD TANKS AND FILTER FIW AND 3% KCL FLUID. DISPLACED WELL WTIH FIW-3% KCL FLUID. OFF LOAD GRAVEL PACK EQUIPMENT AND PREP RIG FOR SHUTDOWN PERIOD. RIH WITH 3-1/2" DRILL PIPE AND TAGGED FILL AT 2682'. POOH AND LAY DOWN DRILL PIPE. RIH WITH 3-1/2" PH-6 TUBING. POOH AND LAY DOWN SAME. CHANGE UPPER RAMS TO 2-7/8" AND TEST SAME, OK. PICK UP AND RIH WITH 2-7/8" BUTTRESS TUBING KILL STRING, AND BAKER 9-5/8" HURRICANE PACKER. TUBING TAIL AT 2604', OTIS "X" LANDING NIPPLE AT 2573' AND PACKER AT 536'. SET PACKER AND TEST TO 500 PSI. RIG UP MYERS WIRELINE. SET "PX" PLUG AND PRONG IN "X" NIPPLE AT 2573'. RELEASE FROM HURRICANE PACKER AND POOH. RIH WITH OVERSHOT AT 528'. REMOVE BOPE, INSTALL TREE AND TEST SAME TO 3000 PSI, OK. RELEASED RIG AT 1200 HRS. OPERATIONS SUSPENDED DUE TO DRIFT RIVER TERMINAL SHUTDOWN. Unocal Drilling/Workover Record Alaska Region Lease: Trading Bay State Well: No. A-4 Field: Trading Bay Date: ETD: Details of Operation, Descriptions/Results 03/06/91 2682' 03/07/91 3307' 03/08/91 Skid the rig to A-4. Set BPV, remove tree and install 11" 3M x 13-5/8" 5M XO, 13- 5/8" 5M riser and BOP. Pressure test all BOPE. Pull tubing hanger to floor and remove hanger. RIH an engage Baker "EA" 9-5/8" Hurricane packer at 535'. RU Meyers wireline and test lubricator to 1500 psi. RIH and retrieve equalizing prong from "PX" plug at 2571'. RIH and retrieve "PX" plug. Release packer and CBU. POOH with 2-7/8" tubing kill string. Lay down excess tubing and change top pipe rams to 3-1/2". Test all BOPE. Choke #4 on the manifold failed to test and is in-operable until parts arrive. Slip and cut drilling line 113'. RIH with 8-1/2" bit on 3-1/2" DP and tagged top of sand plug at 2677' DPM. Clean out sand from 2677' to top of cement at 3308'. Good gas and oil shows while cleaning out sand. Circulate clean and observe well for 30 minutes. Well static. Check for fill, negative. CBU. Had 340 units of connection gas. Check for flow, negative. POOH. Make up 9-5/8" casing scraper and RIH to 3307'. Circulate and filter brine with D.E. unit 'to 65 NTU's at the flowlinge. POOH. RIH with Baker Model "D" 9-5/8" sump packer on 3-1/2" PH-6 tubing to 3180'. Break circulation and set packer with the top at 3180'. POOH. Down setting tool. PU 5" 15#, .012 gauge Stainless Steel Wire Wrap (SSWW) liner and gravel pack assembly and RIH to 3180'. Engage sump packer with seals and snap latch. RU BJ pumping lines and test to 5000 psi. Unocal Drilling/Workover Record Details of Operation, Descriptions/Results Page 2 03/09/9! 03/10/91 3307' Clear lines and tubing with 30 bbls of brine. Drop setting ball and wait for 30 :ninutes. Pressure tubing and set Baker 9- 5/8" SC-i packer with top at 2596'. Test backside to 200 psi and release from packer with mechanical rotation. Establish circulation rates in the upper, lower an reverse circulation positions of 200 psi. at 3 BPM. M&P 10 bbl$ 3% KCL/FIW with 70 lb/I000 gal of HEC pre-pad, 49 bbls gel fluid with 140 cu.ft, of ~0/40 meshOttawa san~, 5 bbls gel fluid after pad and displace with ~0 bbls of brine to sand out of 1700 psi. Reverse t~bing clean (8 sx), ~32 cu.ft, sand i~ place. Wait on pack to settle for ] hours. Pressu~'e pack ~o 1700 psi arid b~'oke down S00 psi .~ 0.5 BPM. >~&P 5 bbls of gel fluid pre-pad, ~!,.5 bbls gel fluid with 20 cu.ft, of same sand, 7 bbls ge! fluid af[,_er-pad and displaced with 9.5 bbls of brine to sand out at 2200 psi. Reverse tubing cleaz~ with (6 sx), 14 cu.ft, in place for a total of 146 cu.ft. Closed port collar and tested to 2000 psi. CBU. POOH. RU Schlumberger and run gravel pack log from 3185'-2550'. MU guide shoe and RIH with 3-1/2" tubing. All gel fluid contained Baker Enzyme Breaker. POOH. Lay down all PH-6 3-1/2" tubing. Pull wear bushing and change top pipe rams to 2-7/8" and test same. MU Baker seal assembly on 2-7/8" tubing with isolation string and Otis 9-5/8" "VST" packer with seal bore extension and RIH. CBU. Stab into Baker SC-1 packer at 2596'. PU off locator and test back side to 250 psi. Drop setting ball. Set Otis packer with the top at 1591'. Release from packer and POOH. MU Otis seal assembly and RIH. Stab into packer at 1591' and space out to RU slickline. RIH and open "XA" sleeve at 2528'. POOH. Pressure test backside of isolation packer to 700 psi. RIH with slickline and close "XA" sleeve. POOH. Well beginning to flow. Circulate out gas and oil. POOH. MU completion string of jeWelry, GLMs and RIH with 2-7/8" tubing. Install SSSV nipple, attach control line and test to 5000 psi. RIH and stab "VST" packer at 1591'. Space out tubing and install tubing hangee. Attach SSSV control line and test to 5000 psi. Unocal Drilling/Workover Record Details of Operation, Descriptions/Results Page 3 03/11/91 3307' Stab into "VST" packer and test seals to 250 psi. Land tubing and install BPV. Remove BOPE. Install Tree. Test control line to 5000 psi and flange to 3000 psi. RU Meyers WL and pulled dummy valve and ran bail valve. Released Rig at 1200 hrs. Unocal North Ameri(~ Oil & Gas Division Unocal Corporation -~ P.O, Box 190247 Anchorage, Alaska 99519-0247 Telephone (907) 276-7600 UNOCA.L ) Alaska Region April 16, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Ms. Elaine Johnson Dear MS. Johnson: I have attached surface survey locations of the "Legs" and conductors for the four platforms in the Trading Bay Unit as well as the Union Oil-operated Monopod and Granite Point Platforms. I was unable to locate any plats from a registered surveyor but I hope this will meet your needs. GSB/lew Yours very truly, Regional Drilling Manager CONDUCTOR 1 2 3 4 5 6 7 8 9· l0 ll 12 13 14 15 16 17 18 19 20, 21 22 24 25 26 27 28 29 30 31 32 MONOPOD CENTER FROM SOUTHEAST CORNER, "Y" = 2,523,126 "X" = 218,871 "Y" COORD. 2,523,134.3 2,523,130.2 2,523,125.7 2,523,121.7 2,523,118.2 2,523,114.4 2,523,113.2. 2,523,113.2 2,523,114.8 2,523,117.7 2,523,121.8 2,523,126.4 2,523,130.3 2,523,133.8 2,523,137.6 2,523,138.8 2,523,138.8 2,523,137,.2 2,523,132.8 2,523,129.4 2,523,132.0 2,523,128,4 · .2,52.3~.~4.~ .*.** --__ 2,523,133.9 2,523,120.9 2,523,131.4 ~ 2,523,118.1 2,523,127.2 2,523,123.6 2,523,120.0 2,523,122.6 2,523,119.2 "X" COORD. 218,880.9 218,883.2 218,883.9 218,883.2 218,881.3 218,876.8 218,873.0 218,869.0 218,864.6 218,861.1 218,858.8 218,858.1 218,858.8 218,860.7 218,865.2 218,869.0 218,873.0 218,877.4 218,875.7 218,878.6 218,870.8 218,873.9 218,867.0 218,878.1 218,863.9 .218,875.0 218,865.1 218,868.1 218,871.1 218,863.4 218,866.3 WELL # FSL FEL A-28 1621 554 A-25 1617 551 A-30 1612 551 1608 551 A-27 1605 '553 A-23 1601 557 A-21 and RD 1600 561 A-22 1600 565 A-14 1601 57O A-13 1604 573 A-17 1608 576 A-8 1612 577 A-15 1616 577 A-24 and RD A-29 A-9 and RD A-19 A-18 A-11 A-3 A-7 A-32 A-12 and RD A-20 A-2 A-16 A-26 A-10 A-5 and RD 1 &2 1620 574 1624 570 1625 566 1625 562 1624 558 1619 559 1616 556 1618 564 1615 1611 1600 1607 1617 1604 1613 1610 1606 1609 1605 561 558 : 568 556 571 559 570 566 563 571 568 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAES' 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well ~ Change approved program __ Pull tubing __ Variance __ 2. Name of Operator ! 5. Type of Well: Union Oil Company of California (UNOCAL) Developmentx / Exploratory __ 3. f Stratigraphic ~ Addre~S.o. Box 190247, Anch, Ak., 99519-0 47 Service__ 4. Location of well at surface Monopod Platform Conductor #23 Operation shutdown __ Re-enter suspended well /' z~- Plugging ~ Time extension ' Stimulate Perforate ~ Other 6. Datum elevation (DF or KB) RT 101' MSL 7. Unitor Property name · ~'raa~ng Nay Field 8. Well number feet 1611' N & 558' W f/SE cor., Sec. 4, T9N, R13W, S.M. ~topofproductiveinterval 1660' MD, 1642' TVD; 75'N & 149'W f/Surface Loc. ~effectivede~h 3510'MD, 3437' TVD; 202'N & 573' W f/Surface ~oc. ~total depth 10609' MD, 10491' TVD; 170' N & 653' W f/ Surface Loc. 9. Permit number 67--2 10. APl number 5o- 733-20001.' 11. Field/Pool Tyonek "B" Zone 12. Present well condition summary Total depth: meaS'ured true vertical 10,609 'feet Plugs (measured) PBTD 10,491 'feet @ 6200 ' Effective depth: measured true vertical 3,510 'feet 3,437 ,feet Junk (measured) Casing Structural Length Size Cemented Measured depth True vertical depth Conductor Sudace 1077' 13-3/8" 1200sx 1077' 1075' Intermediate Production Liner Perforation depth: measured true vertical 6370' 9-5/8" l175sx 1660'-1695'; 3382'-3404' 1642'-1677'; 3313'-3334' Tubing (size' grade' and measured depth) 2 7/8", N-80, 6.4# @ 3317' Baker "FH" pkr @ 1540' & Model Packers and SSSV (type and measured deO~b~s SSSV at 281 6370' 6281' R ECEI VED JAN 0 4 Anchorc¢:~ "D" pkr at 3262' 13. Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch 14. Estimated date for commencing operation January ~5, 1990 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil x Gas __ Suspended __ Service 17. I hereby certify that the foregoin/g is true a~ncl,.corr,e~ct to_the best of my knowledge. ~,~¢~ ~ COMMISSION USE ONLY Date Signed ~'. ~ oy D. itle Environmental Engineer Conditions of approval: Notify Commission so representative may witness I Approval No. I Plug integrity __ BOP Test __ Location clearance __ ,L/~, zh Mechanical Integrity Test __ Subsequent form required 10- ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Approved C~opY ·Returneo .-- Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE PROCEDURE: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 1~) 12) 13) MIRU, Kill well, install BPV, remove tree and install BOPE. Pull existing single completion from 3,317'. Mill over and recoVer the permanent packer at 3,283'. Clean out to ETD of 3,510'. RIH set cement retainer at 3370'. Squeeze and abandon the perforations 3382'-3404' DIL. RIH with cmt ret and set at 1,720'. Lay a 300' balanced plug and abandon the perforations 1,660'-1,695' DIL. Drill out and test perfs. RIH with TCP and perf 196' (8 SPF) within the interval 2752'-3150'. Clean out to 3370'. Fracture stimulate the interval 2752'-3150' in three stages (25-75 BBL, 12 PPG slurry each stage). RIH with a sump packer to 3200' and set. MU wire wrap screen (5.5") and production packer. Gravel pack the zone from 2752'-3150'. Run a single string of 2-7/8" tubing, GLM and GLV. A production packer will.be part of the gravel pack completion and an additional packer will be run to isolate squeezed perfs. RDMO. NOTE: Should H2S be encountered, Unocal will conform to all requirements as set forth in 20 AAC 25.065. Anticipated SBHP: 1400 psi. I II I!1 13 WELL TBS CASING & ABANDONMENT DETAIL h) Rotary Table Measurement at 0.00° .° Ih) Tubing Hanger at.38.10' III.) 13 318'-, 61~,0 J-55 Casing at 1077' IV.) 9 518'~ 40~&43.5~. N-80&J-55 Casing at 63?0', TUBIN~ DETAIL · 2 7/8", 6.4~, N-S0 TUBING I 1.) Otis Ball Valve at 280.06' 2.) Camco GLV at 1482.58' 3.) Otis 'XA° Sleeve at 1503.80' 4.) 2 7/8' x 3 112' Crossover at 1538.25 5.) 3 112' x 4 112° Crossover at 1539.03' 6.) Baker Model 'FH° Hydrostatic Packer from 1540.63' to 1548.38' 7.) 4 1/2' x 3 112° Crossover et 1549.28' 8.) 3 1/2' x'2 718' Crossover at 1550.18' lt.) Otis 'XA' Sleeve at 1581.37' 10.) Blast Joints from 1646.56' to 1705.96' 11.) Otis 'XA° Sleeve at 3226.37' 12.) Locator Sub at 3261.52' ~3.) Baker Model 'D' Ret. Prod. Packer with Seal Assembly from 3262.62' to 3282.62' 14.) Otis 'XN' Nipple at 3315.67' 15.) Bottom of Mule Shoe at 3317.17' PERFORATION RECORD DA TE' ' INTERVA'L · CONDITION 3125177 · 1660!-1695' 24-A Sand Production 312917'7 3382'-3404' 44-7 Sand Production 44'7 Note: Squeezed and Abandoned Parrs not Listed. See Well History. WELL-TBS WELL SCHEMATIC UNION 0IL COMPANY OF CALIFORNIA. LOS ~4IGEL~'$ ' J ~3-3/8" 6~# J-55 1077' BAKER WELD SCREEN GRAVEL PACK 20-40 MESH OTTAWA SAND 9-5/8" 40 & 43.5# N-80 & J-55 / 6370' 1 J2 J J 3 [_._ 5 - 7 TUBING DETAIL 2-7/8", 6.4#, N-SO TBG BT&C. 1) OTIS BALL VALVE 2) GLM's 3) OTIS XA SLV 4) OTIS "VST" PACKER 5) OTIS XA SLV 6) OTIS "X" NIPPLE 7) BAKER SC-1L PACKER AT 2600' 8) 5-~/2", ~5.5#, J-55 WIRE WRAPPED SCREEN .012" 9) BAKER SUMP PACKER AT 3170' CEMENT SQUEEZE 1660'- 1695' "B" ZONE INTERVAL 2752'-2770' 2810'-2830' 2897'-2935' 3005'-3030' 3055'-3150' CEMENT SQUEEZE 3382'-3404' JUNK @ 3510' ETD. WELL TBS A-4 PRODUCER PROPOSED WELL SCHEMATIC UNION OIL COMPANY OF CALIFORNIA (dbcl UNOCAL) DRAWN: CLL SCALE: NONE DATE: 9-07-89 . J BELL NIPPLE I FLOWLINE 2" KILL LINE WITH (2) 2" 5M VALVES :2L> KILL LINE FROM MUD PMP & CEMENT UNIT 12" 3000 PS! ANNULAR I I I BLIND RAMS PIPE RAMS L_ I i I PIPE RAMS 15-5//8" ,3M FLANGE ADAPTER 5M x 5M 5-5//8'' 5M FLANGE DOUBLE GATE 5M 15-5/8" 5M FLANGE 4-" CHOKE LINE WITH ONE REMOTE & 1 MANUAL 4" 5M VALVE RISER ,:l) ::[:' I CONNECTED TO CHOKE MANIFOLD (SEE MANIFOLD DRAWING) 5-5/8" 5M FLANGE SINGLE GATE 5M 5-5/8" 5M FLANGE 10" 5M x 15-5/8" 5M ADAPTER CAMERON 5M DCB SPOOL I I 15-5/8" DOPE 5M STACK ALL DRILLING OPERATIONS DRAWN: CLL APP'D: GSB SCALE: NONE DATE: 5/12/89 UNION OIL COMPANY OF CALIFORNIA (dba UNOCAL) STATE OF ALASKA ALASKA ,~-IL AND GAS CONSERVATION C~JMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] 2. Name of Operator UNION 0IL COMPANY OF CALIFORNIA COMPLETED WELL PO BOX 6247 ANCHORAGE AK 99502 4. Location of Well - Conductor #23, 1611'N Section 4, T9N, R13W, SN. 5. Elevation in feet (indicate KB, DF, etc.) RT 101' MSL 6. Lease Designation and Serial No. ADL 18731 7. Permit No. 67-2 OTHER 8. APl Number 50- 733-20001 9. Unit or Lease Name TRADING BAY STATE 10. Welt Number TBS A-4 12. (Submit in Triplicate) Perforate ~ Alter Casing [] - Perforations Stimulate [] Abandon I~ Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other ~] Pulling Tubing {Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion,) 11. Field and Pool TRADING BAY FIELD "A" & "B" ZONES [] [] [] Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any propo~(~)[.~..bandonment see 20 AAC 25.105-170). 1. Hove rig over TBS A-4 and rig up. 2. Kill well, install BRV, remove tree, install and test BORE. 3. Rull and recover single 2 3/8" completion assembly. 4. Set cement retainer ~ +_~260' and squeeze the 44-7 perfs for abandonment with +150 sxS of cement. -- 5. Squeeze for isolation the 41-8, 41-3, 33-6 and 26-7 sands. 6. Squeeze for abandonment the 24-A perfs, thru cement retainer set G +1600' with. +200 sxs of cement. - -- 7. Clean out retainer and cement to +3260' ETD. 8. Run CBL-VDL-GR with CCL log from +--3260' to surface. 9. Rerf and *frae-pack "B" zone oil sands individually as follows: "26-7 +2315 to +2345' DIL -- -- "33-6" +2910 to 2930' DIL -- "41-3" +3015 to +3025' DIL -- I "41-8" +3105 to +3130' DIL -- I *NOTE: The existing casing is 9 5/8" 40# 0-55 with a co.llapse rating of 2056 psi ~ possibility of 80% of yield, if frac pressure exceeds this there is the collapsing the 9 5/8" casing above the treating packer. ll. Complete well as a single 2 3/8" producer. 12. Install BRV, remove BORE, install and test tree. l~. Place well on production and move rig. 14. I berry ~ertify that the_foreg~1'rl~ is true and correct to the best of my knowledge. Signed .~/"~,,~, ~__J/.,~f_~~ ~Title District Drlg Superintendent The~~/below for Commission.use' C~ns of Approval, if any: ORIG'HAL SIGNED BY LONNIE C. SMITH Approved Copy Returned By Order of COMMISSIONER the Commission Date 6115183 ....... Date ~'.~'__~._/~ Approved by Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate PAGE NO. 7 38.10 Landed Below RT. NOTE: See Tbg. Detail for letters. 13 3/8" 61# J-55 Butt. @ 1077'. D Top of 9 5/8" pkr. @ 1540.63'DIL 9 5/8" X 4 1/2" Baker Model FH Hydrostatic single string. Top of 9 5/8" Pkr. @ 3270.00' (WL 9 5/8" X 3.25 Baker Model "D" Ret. Prod. Pkr. REV. I DATE , . FOF~f~ 247 (N~ 5/~) .,I K Btm. of string 3317.17'. Btm. 9 '5/8" 43.5# N-80 & 40# J-55. Buttress @ 6370'. ~ CKD. I i i AFP'D. SCALE DATE WELL SCHEMATIC TBS A-4 TRADING BAY FIELD Started 3/9/77 Completed 3/29/77 UNION OIL COMPANY OF CALIFORNIA Union Oil and Gas P--~<~sion: Western Region Union Oil Company ol California P O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 unl n November 15, 1977 Mr. O. K. Gilbreth Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99502 TBS A-2, A-18, A-16 RE: (:~)A-13 MONOPOD PLATFORM Dear Mr Gilbreth' Enclosed fOr your files are two (2) copies of the completed Well Histories for the above captioned projects. Sincerely yours, kJ1m R) Callender .B'ist¢. Drlg. Supt. cc' Marathon Oil Co. USGS Harry Lee RECEIVED NOV 1 '! !977 Division O~ Oil ~ ~t,i~ ~.r~,~rvatlon o-,oo,-, UNION OIL CO. OF CALIFORNIA SHEET A REPAIR RECORD PAGE NO. .EASE Tradin~ Bay ~ _WELL NO.A-4 WOCONTRACTOR_P~arJ~.e.r_~ril]ing '!ELD Tr~din~ Bay Fiei~ TYPE UNIT _Oilwell 860 ;EGAN: 3/9/77 COMPLETED: 3/3]/77 ELEVATIONS: GROUND ]74 'ERMIT NO. 67-2 SERIAL NO. ADL-18731 AFE #~7]003 .CASING HEAD ~OMPANY.' E~'~INEE;i% /~3hriswell/Watson.. TUBING HEAD ~PPROVED ~/~' ~.//~Y~£~ ROTARY DRIVE BUSHING !0 !'MLLW ~ (_'J~n-~-. ~a[l~n~ler - CASING & TUBING RECORD SIZE DE~TH., WEIGHT GRADE REMARKS _ 13 3/8 1077 61# J-55 Cmt'd w/1220 sx. "G" neat-good returns to surface. 9 5/]" 6370' !40# & 43.5~N-80 & JS!; Cmt'd thru 4- 3/4" holes @ 5954 w/500 sx. "G" w/DV collar @ .i 3932' w/ 375 sx. "G". Cmt'd between 9 5/8" & 13 3/8" thru lower csg. hd. valve w/ 300 sx. "G". 2 7/B" 3317' N-80 5uttress __ PERFORATING RECORD ~ATE INTERVAL ]~T.D. I~EASON ~)~ESENT CONDITION / 20/67 6052-6000 6200 Abandoned 5945-5915 ,,- , 5875-5820 " " . 5765-5725 " " : "'~ ';5695-5610 " " 5550-5510 " " 5510-5450 " " Sqz'd w/ 535 sx. Class "G" Cmt. ~21/67 5430-5415 ,, ,, 5370-5355 " " ~ 5310-5280 " " 5235-5220 " ' ." [ 5205-5175 " ~" 5135-5125 " '" '~ INITIAL. PRODUCTI¢ &A,11&&A, dK'&-LJ. ,E-&&1~'Jd~'V'~,,,'~,A4, Vd, l dr&,& d,d.l,,bb ,b~,~,d4, i >AT~ I INTERVAL ' NET OIL CUT GRAV. C.P. T.P. CHOKE MCF GOR I~£MARKB · "13/77 24 A & 44-7 - 10 160 68 3688 Gas Well , . .. ?' :. . ='-' ':/~..i- ' . · . · · ! W'~.T;T_ HISTORY PRIOR TO REPAIR LAST COMPLETION NO. OMPLETION DATE: 4/23/67 RODUCING INTERVAL: 24 A Sand ~660-!695' ~-7 q~..~ ~cv_~a~, :~ITIAL PRODUCTION: .3688 MCF/D AST REGULAR PROD. & DATE: UMULATIVE PRODUCTION' EASON FOR REPAIR: To com,nl~_t~ ns ~ gas -,.we]] .f...m-. f{,al supply, FCFiVr. h ~orm D-IOOI°B UNION OIL CO. OF CALIFORNIA REPAIR RECORD SHEET B PAGE NO, ? LEASE Trading Bay State 7OMPLETION DATE: 3 / 31/77 DATE E.T.IDo .'}ATE :/21/67 /26/67 /21/77 /23/77 / /24/77 /25/77 /29/77 INTERVAL 3825-3765 5085-5040 3765-3745 3710-3610 3585-3545 6'335-6265 6215-61_60 6140-6000 3356-3356 1820-1822 1640-1642 1820-1822 1660-1695 3382-3404 TYPE: Cameron i.WELL NO.A-4WO FIELD Trading Bay Field APPROVED, Jim R. Callend~r DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS PERFORATING RECORD ETD REASON 6200,, Abandoned II I1 II I1 II I1 II II Il Il 3450 Squeeze 3510 " II II Il Il " Production " Production (continued) PRESENT CONDITION Sqz'd w/ 275 sx. Class "G" cmt. Same as above Sqz'd. w/ 535 sx. Class "G" cmt. Sqz'd w/ 200 sx. Class "G" cmt. " " 300 " " " " " " 250" " " " " " 300" " " " Open for production. Open for production. WELl. I.~AD ASSEMBLY CASING HEAD: Cameron 12" 3000# slip on weld CASING HANGER: CASING SPOOL: 12" 3000~ 9 5/8" ~lip TUBING HEAD: 12" 3000 X 10" 3000# DCB Cameron. 2'7/8. DCB' FBB - lea. 2 9/16 Bore-& I ea. ~suabe'va2've. TUBING HEAD TOP' Cameron F Gate sing. solid block 10" 3000# w/ prep. 1/8" control line' MASTER VALVES: 1 2 9/16" master valve & 1 2 9/16" suabe valve. CHRISTMAS TREE TOP CONN.: 2 7/8" EUE Trading-Bay State _ IJNIO I OIL CCI.?N ' OF CALIF IIA tE:CORD o · ~LL t.JO, TBS A-4 . FIELD Tradinq .Bay Field kTE 3/9/77 3/10/77 3/21/77 3/22/77 3/.23/77 DETAILS OF OPERATIONS, DESCRIPTIOIIS & RESULTS IO,609'TD Commenced WO activities on TBS A-4 at 12'O1 a.m. 3/9/77. Tested 4006'ETD'Fi 1 -BOE. RIH w/.8 1/2" bit. Drilled Howco CI BP @3400'. Pushed pieces 9 5/8" csg. to 4006'. Displaced old mud w/ 65# Dril-S WO fluid. Pooh. RIH @6370' w/ 8 1/2" bit & 9 5/8" csg. scraper to 4006'. Pooh RU Schlumberger. Ran GR-CBL-VDL & CNL lOgs. IO,609.'TD 450' ETD (retr. BP!) 9 5/8" csg. @6370' 10,609 'TD! 3450' ETD · cmt. plug:. 9 5/8" cs@. @6370' Same Head'n( IO,609'TD ' 3510'ETD :. cmt. plug. 9 5/8" csg. @6370' RD Schlumberger. RIH w/ Baker Retrievamatic set @3465' aboveC, D and E Zone that was previously squeezed off in perfs. Press. to 1950 psi which is equiv, to 1.06 psi/ft. Held o.k. Pooh. RIH w/ Baker perm. cmt. ret. set @3850' on W.L. RIH w/ open ended 5" DP. Mixed 160 sx. Class "G" cmt. w/ .75% D-31, .3% D-19, .1% D-6. Pumped 160 sx. on top cmt. ret. Pul led to 3450' & rev. out wtr. cushion. Pooh. Set Baker Ret. BP @450'. Nippled dwn. BOE. Released rig to TBS A-2 12:00 noon 3/10/77. Recommenced WO operations on TBS A-4 at'12:01 a.m. 3/21/77. Skidded rig over A-4. RU & tested BOE @ 2000 psi. RIH. Picked ret. BP @450'. Pooh. RIH w/ 8 1/2" bit & 9 5/8" scraper. Drilled cmt. 3468'-3510'. Circ. and build mud wt. to 80#, 55 vis w/.Barite Gel to control 24-A sand of A Zone.. RU Schlumberger. Perf above 44-7 sand fo~ blk squeeze from 3358'-3356' w/ sque~ze.,gun - 2 hpf. RD Schlumberger. RIH w/ RTTS set @3300'. Pumped fluid 2 cfm.@llO0 ps 11 cfm @1500 psi. ISI 1,500 psi, to ilO0 ~ llO0 psi. No pressune, cnange 'in ~3m~7~"bledx 9 5/8 annulusnSi' (~d . With Baker retr. cmt. retainer set at 3~50' above 44-7 sand of B Zone, mixed '200 sx. C1 "G" cmt. w/ .75% D-31, .3% D-19, and .1% D-6. Used 40 cf water ahead and 25 cf behind. Pumped 200 sx. cmt. & cleared perfs (3358'-3356'). I.P. llO0 psi F.P, 2200 psi. CIP 1:30 a.m. No noticeable breakdown. Bled back to llO0 psi. Could not regain final pressure. No pressure increase on 9 5/8" x 13 3/8" annulus during squeeze. Mixed 200 sx. same mixture Cl. "G" cm 'Pumped 10 cfm. I.P. llO0 psi. F;P. 2000 psi, CIP 9:30 a.m. Pulled ret. to 3220' & rev. out. Cleared perfs. Held 1000 psi - pressure on cmt. in place. Steel band fr. retr. cmt. ret. left in hole. RIH w/ 8 1/2" bit & 9 5/8" cs§. scraper. Cleaned hole to 3510'. RIH w/ drillable cmt. ret. RIH w/ Baker perm. cmt. ret. set @3328', above 44-7 sand B Zone. Squeeze perfs located 3358'-3356'. Mixed 100 sx. Cl. "G" cmt. w/ .75% D-31, .3% D-19 and .1% D-6. Used water cushion of 40 cf ahead and 25 cf behind cmt. Squeezed 85 cf cmt. below ret., (74 cf to perfs.) I.P. 1600 psi. F.P. 2100 psi. CIP 1'30 a.m. 3/23/77. Pulled from ret. Left 30 cf cmt. above ret. Rev. out 25 cf water. Pooh. RU Schlumberger. Perforate 1820'-1822' in shale below 24-A sand (1660'-1700') of A Zone. RIH w/ Baker retr. set @1785'. Pumped l0 cfm @150 psi. No press, increase in 9 5/8" x 13 3/8" annulus. Pooh. RIH w/ Baker perm. cmt. ret. set @1785'. Mixed 300 sx. Cl. "G" c mt w/ 8% gel content, 98 pcf. Squeezed 585 cf @ 6 cfm I.P. 50 psi. F.P. 300 psi. CIP 8:00 a.m. Cleared perfs. No press, indication in 9 5/8" x 13 3/8" cs@. annulus. Pulled out'of ret. WOC 4 hrs. Stabbed into ret. @1785' Broke perfs 1820'-1822' @ 6 cfm w/ 200 psi. Mixed '200.sx. cl. "G" cmt. w/ .75% D-31, ~3%'D-19, .1% D-6 and 10% sand. Use8 cushion of' 100 cf ahead and'50'cf behind cmt. Squeezed 24~A sand w/ 204.cf cmt. F{nal press. 250tpsi. CIP 12:00 noon. Pulled from ret. w~'lOi'cf cmt. in DP. Rev. out 50 cf water, lO cf cmt. WOC.6 hrs. RIH w/ Baker pkr. burnover tool. Burnover cmt. ret. @1785'. C- D PAGE I'b, ,,, ~ EASE Trading Bay State UNI( I OIL OF CALIFOR .IIA ELL ~'~LL NO, TBS A-4 FIELD Trading Bay Field DETAILS OF OPERATIONS, I~ESCRIPTI~)S & RESULTS 10 3./24/77 3/25/77 3/26/77 .3/27/77 IO,609'TD 3515' ETD (hard cmt.) cmt. ret.. @3328' ~ 9 5/8".csg. @6370' · IO,609'TD 3510' ETD ' cmt. pl 9 5/8" csg. 06370' . -. ; · . Same Headinc Same Headir 3 Same Headin Test. perfs (1820'-1822') below 24-A sand (1660'-1700')'w/ 1650 psi - o.k. RU Schlumberger. Perf 1640'-1642' 2 hpf, above 24-A sand w/ squeeze gun. RD Schlumberger. RIH w/ Baker perm. cmt. ret. set @1598'. Broke dwn. perfs (1640'-1642') w/ 10 cfm @400 psi. Mixed 250 sx. Class "G" cmt. w/ .75% D-31, .3% D-19, .1% D-6 and 10% sand, 118 pcf. Used water cushion of 50 cf ahead and behind cmt. Squeezed above 24-A sand w/ 235 sx. cmt., leaving cmt. just below ret. @1598'. Final press. 350 psi. CIP 3:40. a.m. Rev. out 50 cf water. RIH w/ pkr. burnover tool. Burnover cmt. ret. @1598'. Pooh w/ ret. RIH w/ 8 1/2" bit & 9 5/8" csg. scraper. Tagged hard cmt. @1600'. Drilled hard cmt. to 1630'. Ran in to 3288', pumped fill to 3293', drilled cmt. stringers to 3315'. Hard cmt. @3315'. Pooh w/ 8 1/2" bit & 9 5/8" csg. scraper. RU Schlumberger. Perf. 24-A sand 1660'-1693' w/ 4" csg. gun, 4 hpf. RD Schlumberger. RIH w/ Baker DST tool set @1588'. Tool failed to test. Pooh. Re-ran Baker DST tool to 1588'. Displaced DP w/ 750 psi gas. Started flow test. 12:00 noon, 3/25/77. 24/64" choke. S.I. @ 6:00 p.m. 3/25/77. Time Surface Press. (PSI) BBL. Gas Rate l":O0 500 230 76.5 ~¢~ 2:00 575 0 1328 3:00 600 0 1350 4:00 605 0 1428 5:00 610 0 1427 5:30 610 0 1428 SIP at 6-00 p.m. 610 psi SIP at 6'45 p.m. 700 psi Pooh w/ DST. RIH w/ 8 1/2" bit. Tagged & drilled cmt. 3315'- 3328'. Drilled cmt. ret. @3328', pushed to 3510'. Pooh. RU Schlumberger. Ran gage ring to 3400'. RIH w/ Guiberson Mod A-R drillable prod. pkr. Set pkr @3300' between 44-7 sand (3370'- to 3490') and 24-A sand (1660'-]700') RD Schlumberger. Ran 2 7/8" single tbg. string w/ acc. and Guiberson unipak hyd. pkr. Landed tbg. Tested seals in perm. pkr @3300'. No i~est. Unable to locate leak by pressure testing w/ W.L. Set pumps. Pulled tbg. string to hyd. pkr. Tes.ted tbg. below hyd pkr. to 3000 psi. o.k. Pooh. Made up seal assy. on 5" DP Tested Guiberson Mod A-R dri-llable prod.' pkr w/ seals on 5" DP. Pkr. was not set. Pooh w/ DP & seals. RIH w/ 8 1/2" bit, jars and bumper sub, Pushed pkr. to bottom 3510'ETD. Pooh. Barite gel mud system contaminated w/ cmt. RIH w/ bit & scraper. Displaced mud w/ 68 pcf KCL, Dril-S WO fluid. :ASE Tradinq Bay State tlNIO t OIL OF CALIFOR IIA t:CORD ¥~-LL [~0, TBS A-4 FIELD Trading Bay Field DETAILS OF OPERATIONS, DESCRIPTIO~IS & RESULTS kTE 3/29/77 12 3/31 : Same Headi n§ II II Pooh w/ 8 1/2" bit & 9 5/8" csg. scraper. RIH w/ Baker ret. pkr. on 5" DP. 'Tested csg. for good setting area from 3292' to 3260' o.k. Pooh. ~U Schlumberger. Set Baker Mod D perm. prod. pkr @3270' W.L. between 24-A sand (1660'-1700') and 44-7 sand (3370'- 3490'). Run 2 7/8" seal lock tbg. and acc. w/ Baker hyd. pkr. @1546' above 24-A sand located on perm. pkr @3270', spaced out and landed tbg. All comm. tests o.k. Nipple dwn. BOE. RU tree. Perf. top of 44-7 sand @3382' to 3404'. Fluid level @1430'. Releasec rig to TBS A-2 12:00 midnite 3/29/77. Displaced tbg. string w/ gas cushion to "XA" sleeve @3232' after di'splacing annulus w/ FIW. :_EASE Trading Bay State UNION OIL COFBANY CALIFORNIA I';tLLL I'~LL ~10, TBS A-4 FIELD Trading Bay Field ~TF_ ElD JTS. 49 38 101 DETAILS OF OPEP2~TIONS, DESCRIPTIOHS & RESULTS TBS A-4 WO 2 7/8" TBG. DETAIL DESCRIPTION FOOTAGE 2 7/8" Mule Shoe, 3.22OD, 2.50ID "XN" Nipple, 2.313 ID, 3.75 OD "X"-Over Sub 2 7/8" Buttress Tbg. "X"-Over Sub 9 5/8" X 3.25 Baker Model "D" ret. prod. pkr. @ 3270' WL. Seal Assy 2.44"ID & 3.2" OD Locator Sub. "X" -Over Sub 2 7/8" Buttress Tbg. "XA" sleeve Otis, 3.75 OD & 2.313 ID 2 7/8" Buttress Tbg. Blast Jts. (3 ea.) 2 7/8" Buttress Tbg. "XA" Sleeve Otis, 2.131 ID & 3.75 OD 2 7/8" Buttress Tbg. "X"-Over Sub 3 1/2" Butt. X 2 7/8" Seallock "X"-Over Sub 4 1/2" 8rd. X 3 1/2" Butt. "X"-Over 4 1/2" 8rd X 4 1/2" Butt. 9 5/8" X 4 1/2" Baker Pkr. Mod. "FH" Hydrostatic "X"-Over 4 1/2" 8rd X 4 1/2" Butt. "X"-Over 4 1/2" Butt. X 3 1/2" Butt. "X"-Over 3 1/2" Butt. X 2 7/8" Sealloct~ 2 7/8" Butt. Tbg. "XA" Sleeve Otis, 2.313 ID, 3.75 OD 2 7/8" Butt. Tbg. 2 7/8" Camco GLV 4.750OD, 2.347ID 2 7/8" Butt. Tbg. 2 7/8" Otis Ball Valve, 1.125 ID, 2.313 OD 2 7/8" Butt. Tbg. 2 7/8" Butt. Pup Jr. 2 7/8" Butt. Pup Jr. 2 7/8" ,Butt. Pup Jr. Pup Jr. Tbg. Hgr. Landed below rotary .70 .80 1.12 30.78 1.15 20 00 1 10 97 30 90 3 28 1520 41 59 40 61 91 3 28 30 73 BOTTOM 3317.17 '3316.47 3315.67 3314.55 3283.77 3282.62 3262.62 3261.52 3260.55 3229.65 3226.37 1705.96 1646.56 1584.65 1581.37 TOP 3316.47 3315.67 3314.5~ 3283.77 3282.62 3262 62 3261 52 3260 55 3229 65 3226 37 1705 96 1646 56 1584.65 1581.37 1550.64 .46 1550.64 1550.18 .90 1550.18 1549.28 .90 1549.28 1548.38 7.75 1548.38 1540.63 .80 1540.63 1539.83 .80 1539.83 1539.03 .78 1539.03 1538.25 31.17 1538.25 1507.08 3.28 1507.08 1503.80 31.77 1503.80 1472.03 9.45 1472.03 1462.58 1180.17 1462.58 282.41 2.35 282.41 280.06 216.33 280.06 63.73 10.11 63.73 53.62 10.02 53.62 43.60 3.20 43.60 40.40 1.30 40.40 39.10 1.00 39.10 38.10 38.10 38.10 -0- TOTAL JTS. OF 2 7/8" BUTTRESS TBG. (3134.17'). Dear Mr. Hamilton: Union Oil and Gas C..4on: Western Region Union Oil Company of California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 unlln June 17, 1977 Mr. Hoyle Hamilton Division of Oil & Gas State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99502 Enclosed for your files are two (2) copies each of the Sundry Notice & Reports on Wells (Form 10-403) for the above captioned wells. sk · Encl. (4) cc: Marathon Oil Co. Rodney Smith-USGS Very truly yours, Gary E. Carlson Engineer Form 10-40.3 REV. 1-10-3'3 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) OIL I--1 GAS ff-I WELL I---J WELL~I~.--I OTHER 2. NAME OF OPERATOR Union Oil Company of Calif. 3. ADDRESS OF OPERATOR P. O. Box 6247, Anchorage, Alaska 4. LOCATION OF WELL At surface I611'N & 558'W of the SE corner. Section 4: T9N, R13W, S. M. 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 99502 RT 101' above MSL. CheCk Appropriate Box To Indicate Nature of Notice, Re 14. 5. APl NUMERICAL CODE 50-133-20001 6. LEASE DESIGNATION AND SERIAL NO. TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) ADL-18731 17. IF INDIAN, ALLOttEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Trac]~n~ Rn.v ~qfnf~ 9. WELL NO.~ · A-4 10. FIELD AND POOL, OR WILDCAT Trading Bav-B Znne '11. SEC.,T.,'I~., M.,~BOTTOM HOLE OBJECTIVE) Section 4: T9N, R13W, S. M. 12. PERMIT NO. 67-2 ~ort, or Other Data SUBSEQUENT REPORT OF: NOTICE OF INTENTION TO: FRACTURE TREATMENT ~ ALTERING CASING ABANDON* ~ (NO--orr results of multiple completion onJ~l~ .... C om plet iD n-'~..-_~m Diet Ion 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Both sands completed in TBS A-4 will be tested separately to determine pressures deliverability for reservoir analysis and to allocate production between sands. · Procedure: ~[~ ~ ~!~'' 1. RU slick line unit to TBS A-4 & pull BV. 2. Close "XA" sleeve @ 1582' & rerun BV. 3. Obtain a production rate from the 44-7 Sand. 4. Run an isochronal test on the 44-7 Sand & obtain static pressure. 5. Pull BV, run "PX" plug & set in "XN" nipple @ 3316'. 6. Open "XA" sleeve @ 1582' & rerun BV. 7. Obtain a production rate from the 24-A Sand. 8. Run an isochronal test on the 24-A Sand & obtain static pressure. 9. Pull BV, retrieve "PX" plug, & rerun BV. Z6. I hereby certifY t h/~ he foregoi_~ is~t SIGNED ~"/f~'~ (~ / -' G~/1,'¥ "R"'.. ~n~'l cnr~ {this sgnce for ~tnt. offic, u~) TITLE Engineer DATE 6/16/77 APPROVED BY TITLE CONDITIONS OF APPROVAL, IF ANY= (~Td d~~'-~~ ~L~~~~~~~ti;ns.O~nReverseSide DATE Union Oil and Gas E"~'hion: Western Region Union Oil Company of California P.O. Box 6247, Anchorage, Alaska 99502 Telephone' (907) 276-7600 union April 25, 1977 Mr. Hoyle Hamil ton Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 C. ~-'~'.'~ ENG - i' ENG--J--' ....... , .~_ .. SEC coNFER: FILE:., RE' TBS A-4 Monopod P1 atform Dear Mr. Hamilton- Enclosed for your information are two (2) copies of a Completion Sundry Notices and Reports on Wells form for the above captioned project. Si ncerel y yours, Dis,. "DCr~lgl. e~du;~. ~'~' cc' Marathon Oil Co. USGS - Rodney Smith Harry Lee RECEIVED APR 2 7 ~977 Division of Oil and Gas Conservation Anchorage Form' Z~403 ~REV. 1-10-~3 Submit "Intentions" in Triplicate & "Subsequent Reports,' in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.~ ~.. ~,~ ~ _ LtzlVE o~. [-1 GAs 1~3 WELL I i WELL ~i OTHER 2. NAME OF OPERATOR Union 0il Company of California 1977 3. ADDRESS OF OPERATOR [}iVJSJ0ri of 0ii and Gas Cmls, P, 0. Box 6247, Anchorage Alaska 99502 ~ A ~,,~,L ..... 4. LOCATION OF WELL At surface 1611' N & 558' W of SE Corner, Section 4, T9N, RI3W, S.M. 13. ELEVATIONS (Show whether DF, RT. GR, etc.) ll2' RT above MSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re NOTICE OF INTENTION TO; TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MU LTl PLE COMPLETE ABANDON* CHANGE PLANS 5. APl NUMERICAL CODE 50-133-20001-00 6. LEASE DESIGNATION AND SERIAL NO. ADL 1873l ?. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Tradin~ Ba~, State 9. WELL NO. 10. FIELD AND POOL, OR WILDCAT Trading Bay Field ^ & B Zone 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 4, T9N, R13W, S.M. 12- PERMIT NO. 67-2 )orr, or Other Data SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) .... (NOTE= Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. · . , · e · Rigged up over well TBS A-4. Commenced workover operations @ 12:01 a.m. 3/9/77. Removed 1/2" steel plate. Installed & tested BOPE. RIH w/ 8 1/2" bit. Drlg. out 9 5/8" B.P. @3400'. RIH to 4006'. Displaced mud with 65#/cu. ft. Drill-S workover fluid. Ran GR-CBL-VDL log and CNL log. RIH w/ 9 5/8" sqz. pkr. and set @3465'. Press. tested the "C", "D" and "E" Zone sqz. off perfs to a 1.06 psi/ft, gradient. Held o.k. Ran and set 9 5/8" cmt. ret. @3850'. of ret. Released rig to TBS A-2 on 3/10/77. RIH w/ 8 1/2" bit. Laid 160 sx. of Class "G" cmt. on top Recommenced operations on 3/21/77. Cleaned out well to 3510'. 16. I hereby certify that the for~jolng is true and correct ~ - ITLE ._ . ,// .... /j- - y- - (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY= TITLE District Drlg. Supt. DATE 4/21/77 DATE See Instructions On Reverse Side Page 2 April 21, 1977 10. Perforate from 3356' to 3358' to sqz. above the "B" Zone for isolation. Cmt. sqz. with 500 sx. Class "G" cmt. Il. Sqz. above and below the 24-A sand ("A" Zone) as follows: Interval 1820'-1822' 1640'-1642' Amount of Cement 500 sx. Class "G" cmt. 250 sx. Class "G" cmt. 12. Perf. the 24-A sand from 1660' to 1693'. Flow tested the 24-A sand at average rate of 1428 MCFD (dry gas) w/ 610 psi surface pressure. 13. Completed well with 2 7/8" single string. Isolation packers set at 3270' and 1547' to separate the'44-7 sand ("B" Zone) and 24-A sand ("A" Zone). 14. Thru tbg. perf. the 44-7 sand from 3382' to 3404'. 15. Released rig on 3/29/77. RECEIVED APR 2 7 1977 Division of Oil and Gas Conservation Anchorage Union Oil and Ga: ',ision' Western Region Union Oil Company of California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 ~l,. "~' J*~~ :, ':-' '"'3 ,~o" ~'"; t~ ~,.',..', ..... ~'.,~. I 4~,ioI ! v, ',.,,,,..,,' ~,,..,..,, ......... APr1]' 12, 1977~ ,~,.,.'~', . ,~ I I 3 GEOL Mr. Hoyle Hamilton Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 CC: Dear Mr. Hamilton' Enclosed for your Information are (2) copies of the Monthly Report and Workover Operations for the above captioned projects. Si ncerely yours, ~ .1~. Cal 1 ender ~ Drlg. Supt. Marathon Oil Co. Rodney Smith - USGS Harry Lee RECEIVED kn~m'~dm ~. B- I-?0 STATE OF ALASKA SUBMrr ~/ DUPLICATE OIL AND OAS CONSERVATION cON~AITFEE MONTHLY REPORT OF DRILLING R E C E IV E D AND WORKOVER OPERATIONS WELL NAME OF OPERATOR Union Oil Company of California ADDRESS OF OP~ATOI% Division P. O. Box 6247, Anchorage, Alaska 99502 4 LOCATiON OF 1611' N & 558' W of the SE Corner, Section 4, T9N, R13W, S.M. APl NUMEmCAL ~ODE 50-] 33-2000l -00 LEASE DESIGI~ATION AND SERIAL NO. ADL 18731 7 IF INDIA~. ALO7 ~.E~ OR TRIBE NAME 8. L.~IT FARM OR LEASE NAME ttonTrading Bay State 9 WIgLL NO ^-4 10 FLF, LD AND POOL. OR WILDCAT . Tradin9 Bay A a B Zone I1 SEC . T., R. M, (BO'I~I'OM HO12g Sec. 4, T9N, R13W, S.M. I~. PERMIT 67-2 13. REPORT TOTAL DEI~TH AT END OF MONTH. CHA, NGES IN HOLE SIZE. CASING AND C~F_.NTING JOBS INCLUDING DEP'FPI SET AND VOLUMES USED. PERFOP, ATIONS. TESTS AND RESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-TI:~ACKED HOLE A2qO ANY OTHER SIGNIFICANT CI-J, AN~ES IN HOL~ CONDITIONS 3/9/77 IO,609'TD Moved rig from TBS A-2 to TBS A-4. Commenced WO activities 4006'ETD Fill on TBS A-4 at 12:01 a.m. 3/9/77. Tested BOE. RIH w/ 9 5/8" csg. 8 1/2" bit. Drilled Howco CI BP @3400'. Pushed pieces @6370' to 4006'. Displaced old mud w/ 65# Dril-S WO fluid. Pooh. RIH w/ 8 1/2" bit & 9 5/8" csg. scraper to 4006'. Pooh. RU Schlumberger. Ran GR-CBL-VCL & CNL logs. 3/10/77 10,609' TD 450' ETD (retr. BP) 9 5/8" csg. @6370' RD Schlumberger. RIH w/ Baker Retrievamatic set @3465' above C, D and E Zone that was previously squeezed off in perfs. Press. to 1950 psi which is equiv, to 1.06 psi/ft. Held o.k. Pooh. RIH w/ Baker perm. cmt. ret. set @3850' on W.L. RIH w/ open ended 5" DP. Mixed 160 sx. Class "G" cmt. w/ .75% D-31, .3% D-19, .1% D-6. Pumped 160 sx. on top cmt. ret. Pulled to 3450' & rev. out wtr. cushion. Pooh. Set Baker Ret. BP@450'. Nippled dwn. BOE. Released rig to TBS A-2 12:00 noon 3/10/77. 3/21/77 10,609'TD 3450' ETD cmt. plug 9 5/8" csg @6370' Recommenced WO operations on TBS A-4 at 12:01 a.m. 3/21/77. Skidded rig over A-4. RU & tested BOE @ 2000 psi. RIH. Picked ret. BP @450'. Pooh. RIH w/ 8 1/2" bit & 9 5/8" scraper. Drilled cmt. 3468'-3510'. Circ. and build mud wt. to 80#, 55 vis w/ Barite Gel to control 24-A sand of A~e. RU Schlumberger. Perf above 44-7~ for blk squeeze from 3358'-3356' w/ squeeze gun - 2 hpf. RD Schlumberger. RIH w/ RTTS set @3300'. Pumped fluid 2 cfm @1100 psi, 11 cfm @ 1500 psi. ISI 1500 psi, 5 min, bled to 1100 psi. Fm. held 14.1 hereX~t~y ce.i,y float the , e~C'~~trt~ ~ eol-z~-c~ 4/1 2 / 7 7 ~~.~ ~ ~~~ DistriCt Drlg. Supt. ,,~ ~0TE--~or' On thi, form i, requi,e, for e.~ c.lendmr ~,h$ ,egmrdle., of ,me .,.,u, of operetio.., .md muet ~ filed 1. dupli~te with the ~1 mind gue co.mervof~n commiffee b~ the 15~ of the ~.~c.di.~ m.~. mlem othetwl.e directed. llO0 psi. No pressure change in 13 13/8" x 9 5/8" annulus (350 psi). 3/22/77 3/23/77 Same Heading IO,609'TD 351 O' ETD cmt. plug 9 5/8" csg. @6370' With Baker retr. cmt. retainer set at 3250' above 44-7 .sand of B Zone, mixed 200 sx. C1 "G" cmt. w/ .75% D-31, .3% D-19, and .1% D-6. Used 40 cf water ahead and 25 cf behind. Pumped 200 sx. cmt. & cleared perfs (3358'- 3356"). I.P. 1100 psi F.P. 2200 psi. CIP 1:30 a.m. No noticeable breakdown. Bled back to 1100 psi. Could not regain final pressure. No pressure increase on 9 5/8" x 13 3/8" annulus during squeeze. Mixed 200 sx. same mixture Cl. "G" cmt. Pumped 10 cfm. I.P. 1100 psi. F.P. 2000 psi. CIP 9:30 a.m. Pulled ret. to 3220' & rev. out. Cleared perfs. Held 1000 psi - pressure on cmt. in place. Steel band fr. retr. cmt. ret. left in hole. RIH w/ 8 1/2" bit & 9 5/8" csg. scraper. Cleaned hole to 3510'. RIH w/ drillable cmt. ret. RIH w/ Baker perm. cmt. ret. set @3328', above 44-7 sand, B Zone.. Squeeze perfs located @3358'-3356'. Mixed 100 sx. C1 "G" cmt. w/ .75% D-31, .3% D-19 and .1% D-6. Used water cushion of 40 cf ahead and 25 cf behind cmt. Squeezed 85 cf cmt. below re., (74 cf to perfs. IP 1600 psi. FP 2100 psi. CIP 1:30 a.m. 3/23/77. Pulled from ret. Left 30 cf cmt. above ret. Rev. out 25 cf water. Pooh. RU Schlumberger. Perforate 1820'-1822' ~ in shale below 24-A sand (1660'-1700') of A Zone. RIH w/ Baker retr. set @1785'. Pumped l0 cfm @150 psi. No press, increase in 9 5/8" x 13 3/8" annulus. Pooh RIH w/ Baker perm. cmt. ret. set @1785'. Mixed 300 sx. C1 "G" cmt w/ 8% gel content, 98 pcf. Squeezed 585 cf @6 cfm IP 50 psi. FP 300 psi. CIP 8:00 a.m. Cleared perfs. No press, indication in 9 5/8" x 13 3/8" csg. annulus. Pulled out of ret. WOC 4 hrs. Stabbed into ret. @1785'. Broke perfs 1820-22' @ 6 cfm w/ 200 psi. Mixed 200 sx C1 "G" cmt. w/ .75% D-31, .3% D-19, .1% D-6 and 10% sand. Used cushion of 100 cf ahead and 50 cf behind cmt. Squeezed 24-A sand w/ 204 cf cmt. Final press 250 psi. CIP 12:00 noon. Pulled from ret. w/ 10 cf cmt. in DP. Rev. out 50 cf water, 10 cf cmt. WOC 6 hrs. RIH w/ Baker pkr. burnover tool. Burnover cmt. ret @1785'. RECEIVED 3/24/77 3/25/77 IO,609'TD 3515' ETD (hard cmt. cmt. ret @3328' 9 5/8" csg @6370' 10,609' TD 3510'ETD cmt. plug 9 5/8" csg @6370' Test perfs (1820'-22') below 24-A sand (1660'-1700') w/ 1650 psi o.k. RU Schlumberger. Perf 1640'-42', 2 hpf, above 24-A sand w/ squeeze gun. RD Schlumberger RIH w/ Baker perm. cmt. ret. set @1598' Broke dwn. perfs (1640'-42') w/ 10 cfm @400 psi. ~ixed 250 sx. Class "G" cmt. w/ .75% D-31, .3% D-19, .1% D-6 and 10% sand, 118 pcf. Used water cushion of 50 cf ahead and behind cmt. Squeezed above 24-A sand w/ 235 sx. cmt., leaving cmt. just below ret. @1598'. Final press. 350 psi. CIP 3:40 a.m. Rev. out 50 cf water. RIH w/ pkr burnover tool. Burnover cmt. ret. @1598'. Pooh w/ ret. RIH w/ 8 1/2" bit & 9 5/8" csg. scraper. Tagged hard cmt. @1600'. Drilled hard cmt. to 1630'. Ran in to 3288', pumped fill to 3293', drilled cmt. stringers to 3315'. Hard cmt. @3315'. Pooh w/ 8 1/2" bit & 9 5/8" csg. scraper. RU Schlumberger. Perf 24-A sand 1660'-1693_~'~w/ 4" csg. gun, 4 hpf. RD Schl~~--~"~'~ke'r DST tool set @1588'. Tool failed to test. Pooh. Reran Baker DST tool tO 1588'. Displaced DP w/ 750 psi §as. Started flow test 12:00 noon, 3/25/77. 24/64" choke. SI @6:00 p.m. 3/25/77. Time Surface Press (psi) Bbl liquid' Gas Rate 1:00 500 230 76.5 2:00 575 0 1328 3:00 600 0 1350 4:00 605 0 1428 5:00 610 0 1427 5:30 610 0 1428. SIP at 6:00 p.m. 610 psi SIP at 6:45 p.m. 700 psi 8 3/26/77 3/27/77 Same Heading Same Heading Pooh w/ DST. RIH w/ 8 1/2" bit. Tagged & drilled cmt. 3315' to 3328'. Drilled cmt ret. @ 3328', pushed to 3510'. Pooh. RU Schlumberger. Ran gage ring to 3400'. RIH w/ Guiberson Mod A-R drillable prod. pkr. Set pkr @3300' between 44-7 sand (3370' to 3490') and 24-A sand '(1660'- 1700') RD Schlumberger. Ran 2 7/8" single tbg. string w/ acc. and Guiberson unipak hyd. pkr. Landed tbg. Tested seals in perm. pkr @3300'. No test. Unable to locate leak by pressure testing w/ W.L. Set pumps. Pulled tbg. string to hyd. pkr. · · Tested tbg. below hyd. pkr to 30~ psi o.k. Pooh. Made up seal assy on 5" DP. RECEIVED 10 11 3/28/77 3/29/77 Same Heading Same Heading Tested Guiberson Mod A-R drillable prod. pkr w/ seals on 5" DP. Pkr was not set. Pooh w/ DP & seals. RIH w/ 8 1/2" bit, jars and bumper sub. Pushed pkr to bottom @3510'ETD. Pooh. Barite gel mud system contaminated w/ cmt. RIH w/ bit & scraper. Displaced mud w/ 68 pcf KCL, Dril-S WO fluid. Pooh-w/ 8 1/2" bit & 9 5/8" cs§. scraper. RIH w/ Baker ret. pkr on 5" DP. Tested csg. for good setting area from 3292' to 3260' o.k. Pooh. RU Schlumberger. Set Baker Mod D perm. prod. pkr @3270' W.L. between 24-A sand (1660' to 1700') and 44-7 sand (3370' to 3490'). Run 2 7/8" seal lock tbg. and acc. w/ Baker hyd. pkr @1546' above 24-A sand located on perm. pkr @3270', spaced out and landed tbg. All comm. tests o.k. Nipple dwn. BOE. RU tree. Perf. top of 44-7 sand @3382' to 3404'. Fluid level @1430'. Released rig to TBS A-2 @12:00 midnite 3/29/77. RECEIVED Union Oil and Gas D~'Nion: Western Region Union Oil Company of California P.O. Box 6247. Anchorage, Alaska 99502 Telephone: (907) 279-7681 Dear Mr. Hamilton: November 16, 19 ? 6 I 2--r.'i~" ~'" I---I"'-' .r-~.~. ; , D v&s&on o2 S Oas 3001 Porcupine ~ive ~chorage, ~aska 99504 ~: 1PadiS. State m-16 ,~~-13, A-18 Enclosed for your approval are three copies each of the Sundry Notices and Reports on Wells forms for the above captioned wells. Sincerely yours, Dist. Drlg. Supt. Form REV. ]-10-73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF _ASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for pr. oDosals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) ~ O,L I-;3 GAS r-] WELL!~! WELL OTHER -2. NAME OF OPERATOR Union Oil Company oF 3- ADDRESS OF OPERATOR ' ?. O. Box 6247, Anchorage, Alaska 99502 LOCATION OF WELL .At~lrface 1611'N & 558' W of the SE corner, --Section 4, T9N, R13W, S.M. .... 33. ELEVATIONS (Show whether DF, RT, GR, etc.) .112' RT above MSL Check Appropriate Box To Indicate Nature of Notice, Re ~ .... NUMERICAL CODE 50-133-20001-00 6. LEASE DESIGNATION ANO SERIAL NO. ADL 18731 7. IF INDIAN, ALLOTTEE OR TRIBE NAME UNIT, FARM OR LEASE NAME Trading Bay State 9. WELL NO. A-4 10. FIELD AND POOL, OR WILDCAT Trading Bay A & B Zone 31. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 4~ T9N, R13W, S.M. 12. PERMIT NO. 67'2 )orr, or Other Data :~IOTICE OF INTENTION TO: TEST WATER SHUT-OFF [:~ PULL OR ALTER CASING ',FRACTURE TREAT . ,SHOOT OR ACIDIZE REPAIR WELL (Other) S~ ~low MULTIPLE COMPLETE ABANDON * CHANGE PLANS SUBSEQUENT REPORT OF.' WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTER lNG CASING SHOOTING OR AClDIZlNG ABANDONMENT* (Other) {NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form,) AS. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, anti give pertin, ent dates, Including estimated date of =tarring any proposed ,.york. 'TBS A-4 is presently shut in without tubing. It is proposed to DST and complete the well in the 24-A sand (A Zone) and the 44-7 sand (B Zone), Trading Bay State Well #A-4, Trading Bay Field, Monopod Platform, .Cook Inlet, Alaska. 36. I hereby erotiC/that the foreg~ng iS true and correct ~,GNED ~'~/~~/~~ (This~ace for 5tare office u~e} TITLE OATE- COi~DmONS OF APPROVAL, tFANY/~ 0fficmal name of "A" zon~is Trading Bay, undefined oil pool. Use the following codes ~or Field/Pool on production report (10-zt05) 8001/~8. SSSV to be ~nstalled and tested before pu_tti.ng well on_production. Instructions On Reverse Side PLAN OF PROCEDURE 1. Rig up over Well TBS A-4. 2. 'Remove 1/2" steel plate. Install and test BOPE. 3. Retrieve bridge plug @3400'. 4. Run 8 1/2" bit and 9 5/8" scraper to 5000+_. Displace mud with DrillS workover fluid. 5. Run a GR-CBL-VDL log and CNL log. 6. Run and set retrievable squeeze packer.@+__3450'. Re-squeeze the _abandoned C, D, E and Hemlock Zone sands as determined from formation breakdown. Clean out well to +3500'. 7. Squeeze above and below the "B" Zone sand 44-7 (3370'-3490') fgr _isolation as determined from the cement bond log. 8. Squeeze above and below the "A" Zone sand 24-A (1660'-1700') for isolation as determined from the' cement bond log. 9. .Perforate the 44-7 sand, B Zone, from 3465'-3485' and DST for evaluation. 10. Perforate the 24-A sand, A Zone, from 1660'-1695' and DST for evaluation. \ 11. Complete the well as a single gas producer with the A Zone and B Zone isolated by packers as determined from test data. /J/~ SSJV z~M~//=~ Estimated Starting Date: Estimated Operating Time: ':2/10/77 Fifteen (15) days I i' i / t~ ORIGINAL PERFORATIONS NOTE: Cement plugs laid across perfs, prior to deepening well. Zone never re-perforated. Zone Sand Interval ~ootage C Zone C-2 3545'-3585' C Zone C-3 3610'-3710' CZone C-4 3745'-3825' D Zone 53-0 5040'-5085' D Zone ? 5125'-5135' D Zone 53-8 5175'-5205' D Zone 53-8 5220'-5235' D Zone 54-4 5280~-5310' D _Zone 54'9 5355'-5370' D Zone 55-7 5415'-5430' D Zone 56-1 5450'-5550' E Zone 57-2 5610'-5695' E Zone 58-1 5725'-5765' g Zone 58-7 5820'-5875' E Zone 60-0 5915'-5945' Hemlock 6000'-6140' Hemlock 6160'-6360' -:PROPOSED PERFORATIONS 'Zone Sand Interval A Zone 24-A 1660'-1695' B Zone 44-7 3385'-3485' 4O 100 8O 45 10 3O 15 3O 15 15 100 85 4O 55 3O 140 2OO Footage 35 100 Dear Mr'. VonderAhe: Union Oil Company/-r%California union June 19, 1974 bir. Karl L. VonderAhe State of Alaska Dept. of Natural Resources 3001 Porcupine Drive AnChorage, Alaska 99501 Reference is made to your letter dated June 6, 1974 concerning several P-5 forms filed on a number of wells in the Cook Inlet area, which no subsequent notice of work done had been received. Listed below are the four wells in question along with several other wells which we submitted P-3 forms on and since have cancelled the work.. . ~ ' Trading' Bay Unit State G,19' P,3 dated 3/13/72. Trading Bay Unit State· G-8 P-3 dated 5/2/74. Trading Bay Unit State G-1 Trading Bay Unit State G-1 Trad.____~g Bay State A-4 Trading Bay ~tate A-9 P-3 dated 5/6/74. P-3 dated 5/7/74. P-3 dated 11/9/70. P-3 dated 11/13/70. Trading Bay State A-17 P-3 dated 12/15/70. Operations were suspended on Trading Bay State A-17 as a result of collapsed csg. A study is presently underway to evaluate the potential, of abandoning the existing wellbore and redrilling to a downstructUre, location as a single string Hemlock Pool Injection Well. Until such time as the Hemlock Pool is determined to be susceptible to pressure maintenance, no well work is anticipated. The condition of the wellbore remains unchanged from that reported to you on the P-5 dated 12/15/70. In the future we will notify you upon any cancellations after submitting the forms required. ~ry truly yours, District Drlg. June 17, 1974 Dick Evinson of Union Oil was called 6/17/75 and was requested not to submit form 10-405 on A-3 and A-4 wells. Wells shut-in indefinitely. Added to "C" Pool well count,.as shut-in. Joan M. Alaska 99501 Dear the C~k ~let ~ea I f~u~ a fo~ P-3 ~o~ice of Iuten~) filed on a ~mber of %~a-tls o~ whi~ ~ ~!~se~uent ~tt~ of work ~om~ has bee~ receiw~. ~e Bay U~i~, G-19: P'-3 dated 3-13-72. ~'adlnR BaF Sta~e. _A-i~: P-3 dated 11-9-70-. Mo subsequent "..:"----. -'" 7 ' - - _ ~- Bay State A-9: P-3 dated 11-13-70. lA9 aubsequ'ent r~otice. regarding your p l~s for ~he~ if-th~ ~ has ~ been done. If ~y of the proposed ~rk has ~en do~ please file the re~Ired !(arl L, VonderAhe Petro l~aum Engineer .,. STATE OF A~KA ~. ~Pi N~c~ coD~ --fl' '] f>~C J OIL AND GAS CONSERVATION COMMI~EE SUND~Y NOTICE~ AND ~[~O~T~ ON W~ (Do not use this fo~ for proposals ~ drill or to deepen ADL [873[ I 5 ENG t ' Use "APPLICATION 'FOR ~iT~' ~or such'p~o~osalSj ' ,_ ,-, . . . , WELL WELL OTHER Union 0il Company of Ca~ifernia Trading Bay State 3. ADDRESS OF OPERATOR ' 9. ~L NO. I ~RAFI 909 Nest 9th Avenue, Anchorage, Alas~ 9950Z A-4 At surface Trading Bay~i~dle , Zone R13W~ SM. Sec. ~ TGN~ R13W~ ~'~ F~.~vA'ma~ /~h~ wh~*hp~ D~ RT ~R. ~tc. 12. P~T ~O. 14. ' RT 101 above HSL mv~sloM oF on. ANb OAS . Check Appropriate Box To I,ncbcate ~at'ure of N~otice, Report, or Other D~ta NOTICE OF INTENTION TO: TEST WATER SHUT-OF~' PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPI,ETE SHOOT OR ACIDIZE ABANDONs REPAIR WELL CHANGE PLANS ~Other) Complete as "B" Producer !xx. SHOOTING OR ACIDIZING ~ ABANDONMEI{Ts (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. VI'SCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Trading Bay State A-4 was originally drilled and completed as a Hiddle Kenai "C", "D", & "E" zone producer. The well proved to be non-productive and the intervals were ,.~; subsequently squeeze cemented and isolated by an abandonment plug @ 3400'. It is proposed to log & DST the upper "B" interval for zone evaluation, and if indicated, complete as a shallow "B" zone single producer. 1. Hove over well A-4. Remove surface protective plate, install 12" 3000# x 10" 3000# tbg head. 2. Install i test BOE & riser. 3. CO to BP @ 3400'. Circ clean w/wtr. 4. Run Schlumberger electric logs for "B" zone evaluation. 5. Perforate for block squeeze @ 2380' to eliminate lower gas entry. Sqz cmt. 6. CO & change over to invermul. 7. Perforate four 1/2" hpf for "B" zone DST 2120'-2140'+-. DST for zone evaluation & to re-define top of "B" Pool. , 8. Perf 4 - 1/2" hpf for production approx. 2120-2160, 2304-2368+-(D0 NOT reperf DST int.) 9. Run single 2-7/8" tbg complete w/g.1, asses. & hydraulic pkr. Rmv B~E. 10. Install tree. Change over to diesel oil & place on production from "B" zone. November 25, 1970 ESTIMATED STARTING DATE: 16. I hereby and correct SIGI~ED TITLE Dist. Drlg. Supt. DATE 11/9/70 rOval (This space ~' ~ ~"' '~ ~'~"~'~' DATE APPROVED TITLE Chief ~:~'+,~'"~. ,.~.~n Engineer: //-/2 CONDITIONS OF APPROVAL, A :A to co. ingle production from the interval 2120-2160 with "B" pool production is limited to 30 days unless the "B" pool limits are extended Approved Cop7 by the Co~i ttee. ~ IntruSions On Rever~ Side Returned Release Date . 9-_2~_-69 ...... State of Alaska Dep~rtment of Natural Resources DIVISION OF MINES AND MINERALS Petroleum Branch Sec. (4) 3 T. gN INDIVIDUAL WELL RECORD $ Meridian _ i i.i~ , L _ ] Perml t No. 67-2 I s sued .......3-3.67 ~ , Operator _t~nion Oil_Co.,,O~_ .Ca_l!£/~: .,,Location (Surface) Lease No. ADL- 18731 or Owner TTadin~ Bay State Loc (Bottom) 1970' FSL & 600' ~ Sec. 3 r ' We l ] No A-4 A ea ~adi~ Bay Spud Date_.. _- 3-24-67 . DFi 11 ing Ceased ~ Total Depth 10,609~ ,: Suspended 8.2~7~67. '~ Abandoned Re-enterqd & deserted 7~4-67 ' Completed (F-GL-P)6~7~67j-~ iP ......... B/D, Gray ......... APl Gas HCF/D, Bean /6~ CP psi, TP ps Casing: Size ~ SxCmt- Perf: 68~ ~-6370'~ .... 43.5~' av. 3932' 38~'235~ '-~ , _ ~: ~ w/~7~ ..................... 6EOL061C FOR~~ Surface L~est Tes ted Na~ Elevation R3~.112' MLLW P Iugs 7000 ' -6800 ' 205 sx .... , _ _ ,u PRODUCTIVE HORIZONS Depth Con ten ts Year Jan WELL STATUS Feb. Nar Apr May_ June July Aug Sept Oct Nov Dec ~'~-'~;'~--~:::--:- :::' ~ :',: ' !,._.:; _ .: ~ ,, ~i ,~::_:.~ _- ~::''.c~ :'-.~,: ,;.'?~ :':-:':"~':'?' ':: ~ - -: : :::~' ~ -:-": :'~-~ ~'~ t Form P-4 " :~ SUBMIT IN DUPLI~cc --~ '~TATE OF ALASKA ~ (see ~ther structions on OIt &ND ~S ~ON$$RV~TION C~MMI$$1ON reverse side) KO PhUIO LOG* W~L~ ~ W~LL ~ ~'~ ..... Of~ ~ TYPE OF COMPLE~ON: WEL~ OW~ ~N hACK n~SVR. ~her: ~ , '-~ ' ~i~ Oil C~y of Caiife~ia ~' 3. ADDRESS OF OPERATOR i r507 W. Northern lAghts Blvd., Anchora~j Alukl_99505 At su~ace 1611' N ~ 5S8' W Of $~comr Sec~4,. ~N, RIIW, ~ At top prod. interv~ reported below 198' N ~ S~' ~ 0~ ~/U~ace l~.ation At total dep~ ~70' N $ 695'E of s~ce l~tt~ Effective: July 1, 1964 5. L~ASE D"SIGNATION AND SERmL' NO. ADL 18731 6. IF INDIAN~ ALLOTTEE OR TRIBe..'~, NAME 7. UNIT A~REEMENT NAME FARM' OR.CLEAVE NAME _ . 15.3~'24--67Di;; 8%~,' ]'l i~. ~*~"'-~.~ '~~['i~.'~ ~0~.-'(~ "~.~.)~ '.~ ~-~ ~ R~/P~, .~.)i _ 19;- ~LlV. 20. ~ D~H, ~ & ~ ] 11. ~uG, ~ rD., ~ ~ ~ I 22. I~ ~~. COMPL, ~ l- 2a. I~avt~S aO~i~ ~00~ CIB~' ~00~8 .~ DRIlLeD BY I :e .... / HOW 24. ~&ooucxsa XNTEEvAL(s), OF THIS coMPLETION~OP, ~M, NAME (~:~ TVD)* 1220 seel~e ~.~ - , ...... :f:;-7-" ' , , TUBING RECORD' 26. 28. 2 7.~8 ACID, SHOT ~ D:~P/TH -INTERVAL (MD) 5954 29, 3545 MD-$471 VD, 6~0 MD 62~ ~ ~ TYPE ELECTRIC AND OTHER LOGS RUN ~J' '~ CASINO SIZE 9 s/8,, SIZE TOP (MD) ROTTOM (~:~) 31. PERFORATION aEcoa~ (Interval, size $~..reverse side ............ 33.* DATE FIRST PRODUCTION 4~2'7;67 DATE 'OF TEST FLOW. TUBINO PBESS. CASING PRESSURE i['C~CULATIED 180 160 ] ~-'' USed for heI and vetted . - PRODUCTION METHOD (.Flowing, gas lt#)-~i~pt~p--stze and type ct pump) ( ..: ,-: (: - 10 $8/~ . ... - ¢: ~ 2,S :: 875 CF. 2!00 35. LIST OF ATTACHMENTS l WELl':STAtUS (PrO.Ding or ,,, ':~, U'~.'"~'--" ia ~ ,, , WATER--BBL; -. I OA~-OIL RATIO I I WATER--BBL, [ 0IL GRAVITY,AP1 (C~a.) 3 '~ 27e TEST WITNEB'SED BY . "M. L,'-T~tC~er ' ,, 36. I hereby certify that the foregoing %~d'~ttj~clfed infoxmation is complete':..~nd correct-a's determined from all available .,~eeo, Lds ' SIGNED ITLE Dis D 1 8~rint ' - *(See Instructions end S~ces for Additional Data-on Reverse Side)" NOV 21 1961 DIVISION OF MINES & MINERALS ~-~ INSTRUCTIONS ,~? ..~' -~enera~?This form is designed:for eubmitting ~ ~m~le~ a~ ~eet weU eom~etio~ zepo~ ~ ~o~ o~ ~ tT~'o~ ~~ ~e~ ~ el~ '~e~ ~e~e7 o~ ~ 8~te or'bo~fPu~u~t ~ applicable~F~eral ~d/or S~te laws ~d ~a~ons. Any'ne~ssary s~ial, inst~c~Ons c0nce~ng the ~e of this/fOrm and ~e n~ber of coPi~ t0 SubmitS, particularly with ~gard W l~al, area, or re~onal proxies and prattle, either ~e shown below or will ~ ~u~. by, or may ~ ob~in~ from, the 1~ Federal and/or: s~ offi~., s~ ~uctions on i~ ~ and 24, and ~, ~low regarding ~eparate re~r~ for ~pa~ ~mpletions. -' . If not ~ prior to~e time this s~ma~ ~ ~ submitS, ~pi~ of all currently available logs (drille~, g~logis~, ~ple a~d core ~n~ys~, aH ~s electSc, etc.)~ forma- tion a~d pressure ~sts, ~d directional surveys, shoed ~ atoned hereto, to the extent r~u~ bY applicable F~er~'and/oi State la~s and relations. ~ attac~ents shoed, be' list~ on this forTM, s~ item 35. ' .... ~ ....... . ~ l~m 4: If there a~ no applicable' S~ r~uiremen~ lo~tions on F~er~l or Indian land ~ho~d ~ describ~ ~ accotd~ ~th F~eral r~remen~, Cons~t local or F~a~ offi~ fo~ s~ific ~structions. - .... Ifem 18:-~ndica~ ~hich-elevation ~. us~ as ~fer~. (where not o~erwi~ sh~w~); for de~th m~asu~men~ ~Ven-in' ~e~sp~s on th~~'' fora and ~' any: attachment."--' I~ems 2~'~i ~4: if this well is comple~ for separate pr~uction f~m mo~ ~an one interval zone (multipl~-completion)~' so s~te in item-~, anff in i~m 24 show the producing interval, or intervals, top(s), b-0tWm(s) and n~e(S) ~'(ff any) for only the interv~ re~ ~ i~m ~. Sub~t a ~parate r~ (Page) on ~ fo~ ad~tely ide~tified, for each additional in~e~al to be seedily p~u~, showing the addi~onal da~ ~rt~ent to such ~tervah ' " I$~m ~: "Sacks C~ent": Atmch~ supplemental ~ds for.th~ well shoed show the derails of ~y multiple stage ~m;n~g ~'d the l~tioh of the ~menting ~o1. l~m ]$: Submi~ a separate completion report on this form for ~each:'interval to be separately produced. (See instr~ct!on:.for items 22 and 24 above.) -, ~7. SUMMARY OF POROUS ZONER: --~. :-. .... sHOw' ALL I~PORTANT ZONES 0r POROSITY XND CONTENTS THEI~OF; cease INTeRVaLS; aSP. ALL:'~ORILL-s~r~ TESTS, INCLU,IN~. 38. :GEOLOGI~ MAR~RS : ' ' '-' DE~H INTERVAL TESTED~ CUSHION USED, TIME. TOOL OPEN, ·FLOWING AND SHUT-IN PRESSURES, AND RECOVERIES ' ~.. , ~PORMATION ~ ~ TOP! . .... BOTTOM ~ DESCRIPTION, CONTENTS, ETC. ' '~= ..... "~ ~ "' TOP: _. Perfo~ions: 35452~5~, 5~i0-~710 '~74S_3825' 5040-~8~,:~ Si2S-Sl3S, S17~'520,' .:5911: :: " .5725-5765~ 5820-5875 5915-594~, 6000-6.140::: 6'I60-6~60. '::~ ':: .:: : :i ~,, ~ : '=: :.' Niddl~':lenai._. 1180 .. ~...:: 3490 S~dstone,, ... Poss. oil .SS,..;, not tested "':, - ..: .-.:. '- ::. .:. .~:~ :.:.~ ~ .~: ;.Milled:leVi .ISiS. i-:: .::5945 S~dstone~ Oil ~/S ga:s, :prod tested .: '~ :' ": = :~ H~I~ (?) :5996 6560 SS '~ Cong.l,::~, Posi,:'~O - :: : :':~" ' ' . by Prod'-:'test .... . :~ .' 'L ~ : - .. Core ~'i ':2~4.: '=' = :: 2568 Rec, 24" .~:ofi ..s~d .'~ ' 3129 -' ~oii d, pebbiY:~ ~ " :Core' ~2 · 5104- - ' Rec~ 25' :' ::: :: ~ -,~ ,., , :, -- ; 5~ , , .'; . ,'-~ ?;' . .... ". :.: ': ,~ :.; . [ .,- ....... : . .. . ,. . -:: ., ., " : ~ . '" ¢, .: ,-. , :.. : ... C . ' ....... .~, : .. ' '" .: -' " ' ': ~" - ' :': ,i ' ' ':~ ' . . . .. .. , .... .., _.. , ; . . :~; "¥ ... .. . .... v . . .~. , ... . ...... , , . ,, ~. , . -- ,.. ........... , . . ..,' .. . , . . . . , , · , · . . .... . ., . -. , - . . . .. : Fom~ P--~7 SUBMIT IN DUPLI% _ STATE OF ALASKA ., (see ot~er structions on OIL AND GAS CONSERVATION ~COMMISSION reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG * la. TYPE OF...WELL: OIL WELL b. TYPE OF COMPLETION: WELLNEW ~-~OVER WOnK [] DEEP- ~-~ EN GAS. . []. Other WELL [ DRY PLUG[] DIFF.[] BACK IIESVR. Other 2. NAME OF OPERATOR union Oil Company of California 3. AD~RESS OF, O~EBAT,O.R ............. 5"7 W. Northern Lights Blvd., inchorage, Alaska 99503 28. CASINO SIZE WEIGHT, LB./FT. 4. LOCATION OF WELL (Report .location clearly and in accordance with any State requirements)* At surface 1611' N ~ 558' W of S£ corner Sec.. 4, TgN, Rl~, At top prod. interval reported below 282~ N ~ 558~ ~ Of surface location _ At total dep~ 370' N ~ 695' E of surface location 14. PERMIT NO. DATE ISSUED I 67-2 I3-3-67 3~24-67I 4-15-67 [ 5-30-~7. I 24. PROVUCZNO INTERVAL(S), OF THIS COMPLETION~OP, BOT~M, NAME (MD 4~D ~VD)$ 5040 MD 4958 VD, 6360 ~ 6274 VD ~¢~ '~ 26. TYPE ELECTRIC AND OTHER LOGS RUN None on work over CAS~NG ~COR~,~(Re~ort ~ ~tri~s Set ~ 13 3/8" 9 5/8" 29, SIZE 61# 40# ~ 43.5# DEPTH SET 1077 6370 SACK~ 31. PERFORATION RECORD (Interval, size an~number) See reverse side ELEVATIONS (DF, RKB, RT,.GR, ETd.)* ] RT 101~ above MSL. I 33.* DATE FIRST PRODUCTION 5.30-67 DATE OF TEST FLOW. TUEING lq~SS. 5. LEASE DESIGNATION AND SERIAL' NO. ADL 18731 /,, 6. IF I~O£Ak ALLOTTEE OR TRIBE ~AM~ 7. UNIT:AGREEMENT NAME 8. FAR~ OR. LEASE NAME . , ~ading Bay State 9; WELL NO. lo,~ FiE~D A~D ~OOL. OR'w~/8~lle Kenai Trading Bay- H~mlock 11.' SEC, ~., R., M;, OR BLOCK ~AND SURVEY OR. AREA · Sec. 4,.~iTgN, R13W,~ SM :enai ~ P~n~n~qla Alaska 19. ~LEV. 23. INTERVALS DRILLED BY - ROTARY TOOLS 6390 CABLE TOOLS CEMENTING RECORD 1220 ~acks cement 1175 sacks cement DIRECTIONAL SURVEY~ MADE 27. WAS WELL ~OR~D . ]25. WAS No.~ LINER RECORD ~ ~ ~v ~ ,4 -~ 30. TUBING RECORD TOP (MD) BOTTOM (MD) ~M~; F ~d (MD) SIZE I 15~ ~ -~.~ ~ o: 2 7/8 5831 - ~'~ ~ ~ 'ACID. SHOT, FRACT~E, CEMENT SQUEEZE, ETC, 0 ~ DgP~H INTERVAL (MD) I AMOUNT AND KIND O~ MATERIAL ~SED I500. 'sacks cement ' o o ~ ~ ~V 39~2 I 375 sacks cement .~-: o_. ~° ~5_3825 [ soueeged.:90 sacks cement. 2750 "~. ::: F~nal nressure - ' I Well did not ~~e~-. ~'-' Shut in 34. DISPOSITION OF OAS (gold, used yor yuel, ve~ted, etc.) ~' ' ] TEST, WITNESSED BY 35. LIST OF ATTACHMENTS '' ~;~ 36. I hereby certify~at ~ ~ ~ ~ !!I t.1~_~016~ ~ D the foregoing an.~d~ittached information is complet~end correct a~ determined from all avstlabl~e~d~ ~ _ _ ~' '- C ~~~., ~,,LE Dis Dri, ,in.. Su~erinte~de., E , SIGNED ~ H.U. MCMa~ - c~ - ' -: ' , ,'.,; _ _ ' *(See Instructions and Spaces [or Additional Data on Reverse Side) mJV Z 1 1967 DIVISION OF MINES & MINERAl3 ANCHORAGE 37. SUMMARY OF POROUS ZONES: ,- 7''' SHO~' ALL IMPORTANT ZONES OF POROSITY AND CONTENTS TH~,REOF CORED INTERVALS; AND ALL DRILL-STEM TESTS, INCLUDIN/t m DEPTH INTERVAl TESTED, CUSHION USED, TIME YT0(~L~O~EN, FLOWING AND SHUT-IN PRESSURES, AND RECOVERIES "'~ OR~L~TION TOP BOTTO~-~ ,~ - -~ DESCRIPTION, CONTENTS, ETC. .Pe~£orations: 5510~571 5745-5825 :squee~zed 'With 90 sacks cement -. at i, ni:e~ .is-- see first - at interv .is - see first ?-?: ..~. -'~ ate' 6000-,140· 6160-6215, 6215'-6555, 6560 - No ,il or fluid recovered.-" -- Gas to surface in 2 1/2 hoUr:. No measurabl6?. INSTRUCTIONS G~=~l~Aq~his form is design~ for submitt~g a ~mple~ and correct well completion repo~ and log on all types of land'nd l~s ~ eider a~F~era~gency S~te agency, '" or~. both, .pu~uant to applicable F~eral ~d/or S~te - or a laws and regulations. ' Any'ne~sary s~ial instructions cOnce~ing..th~ use of this ~r~ and ~-e n~ber of copi~ to be ~ubm~,'" .... particularly' with ~gard W l~al,' are~ or re~onal .proCures and pra~iic~, either ~e shown below or will be ~su~.by, or may b~"ob~in~ i'h~/~r~S~ o~. S~ i~tructions on items 22~nd 24, and ~, ~w regarding ~ep~rate reports f~ separa~ completions. ~ .... from, the local Federal If'not~fil~ prior to the ~me this summary r~r~,~ submitt~, cop~s of all currently available 'loga '~rillers, g~logists,' s~le ~d core analysis, all t~es electric, etc.), for~a- tiOnshoul~.!nd~Pressurebe listed onteSts'this form,and direc~als~ item 35.surveys~:s~'~d',, ~ ~ be at~ch~: hereto, to the extent r~uir~ ~ applicable F~era~and/o~. ~ S~te ]a~ an~ regulations. All atta~ments 0r'F~e~aio~ce for sp~ificl~m-4: "Yf there are no applicableinstructi~s.~te r~uir~~loCationsc ~ ~, c on F~eral or Indian iand shoed, be describe. ...... in acco~ance:With~. (~ F~eral~ r~uireme~ts.~ . Consult lOcg~ ~g~ ]8: ~dicate which elevation i~sed as-~rence (where not otherWi~ shown) for de~th measuremen~ given in ~er s~ces on th~form and ~ any attachmen~ I~ms 12~ ~4: If this well is comple~ fo~epa~dte~r0duction from more than one interval zone (multiple c0mpletion~so s~te in item ~, an~in it~ 24 show the pr~ucing inter~al, or intervals, top(s), bottom(s) and~a~~(~, any) for only ~he int~v~re~ ~ i~m ~. ~bmit a ~rate ~po~ (pag~ on ~ f~, ad~uately identified, for ~ch a~ditional interval to be sedately '~r~u~d~showing the additional d~ ~rt~ent to such ~terva~ ~ I~em ~: "~acks ae~tr~t~~ ~p~o~.[~~r )~ ~ [$''~]: Submi~ i . th~s~l%shoW~ s e d~,ls of ~y multiple stage ~m~ting~nd the lo.rion of t~e cementing ~ol. 0 ~ ~ ~. [orm zor ea~ xn~erval ~o o~ sejara~xy produc~. (S~ inst~tio~for items 22 and 24 a~ve.) ' ~ ~0 ~J :~2 ... ' ............ - . 5545-358 5040-59~! 6000-65~.t Re-perf~ DST .:600'.0.' · >:: kOEOE~GIC MARKERS TOP . ~ MEAS. DEPTH TRU~VERT. DEPTH · , ., am( . Unchanged, _- 1 Form'P-~7 SUBMIT IN DUPLI(~, rE* STATE OF A[.ASKA ;' -~ (see other .... structions on OIL AND GAS CONS[IRVAT[ON (~OMM[SS[ON reverse side) .... ADL 18731 6. IF INDIAN, ALLOTTEE OR TRIBE NAME WELL COMPLETION OR RECOMPLETION REPORT AND LOG * la. TYPE OF .WELL: Gib . WELL ~] GAS WEr~L [~ DRi~ '~] Other 7. UNIT AGREEMENT NAME b. TYPE OF COMPLETION: WELL OVER EN BACK RESVR. "Other 2. NAME OF OPERATOR :~ union 0il Company of California ;~ ~. ADDRESS OF OPERATOR · 507 W. Northern Lights Blvd., Anchorage, Alaska 99503 4. LOCATION OF WELL (Report ~ocatto~ c~ear~t an~ in ~ceor~ance with anp ~tate requirerae~ts) Ats~rface 1611~ N ~ $$8~ W of SE corner Sec.~:~4, TgN, R13W, At top prod. interval reported below Plugger At total depth 10609 MD ~:;.. 15. 1S7'N ~ 636' E of surfact locat~o~ PERMIT No. / 67-2 DATE SPU~D I' ~e. DATE T.D. -~EACH~,b-']''m ~-~0~. (~Sa~ ~o ~oa.)I 7'11-67] 8-23-67 J 8-27-67 No~. Produceq DATE ISSUED I 3-3-67 Effective: July 1, 1964 5. LEASE DESIGNATION 'AND SERIAL' NO. $. 'FARM OR. LEASE NAME 'Trading BaY State 9. WELt. NO. A-4 ~o, FIELD AND POOL, OR w~'L~'c*~'lmaa Kenai e Trading Bay - .~.~.k i1[.~, SEC., T., R., M. OR BLOCK A¢]~]~%~I~ OR. AREA Sec. 4, TgN' 1t13W' SM · (enai Peninsula Alaska 18~ ELEVATIONS (DF, RKE, aT, OR, gTC.)* J 19. ELEV~ CASiNGHEAD RT 101' above HSL .{ , 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS 24. 20. TOTAL DEPTH. MD & ~ 21. PL~J~3~ ,__ BAI~'(. TOD., MD & ~D ~'~"W MANY* 10609-10491 ~00-3330 ~o~c~o ~g~v~(~), NOne o DRILLED BY > { 10609 25. WAS DIRECTIONAL · Yes 26. 28. TYPE ELECTRIC AND OTHER LOGS.~RUN ..~.- IES, BHC, Sonic, CDM~.¢ CST CASINO SIZE 3/8" 5/8" ~ 61~ c ; 4(L# ~,.4~.5~ ;:~ O O CASING RECORd) (Re~rt ~ strings set i~ ~ell) DEPTH SET (MD) CEMENTING RECORD 1077 6370' 29, ~ ~; ,--.i . LINER RECORD 27. WAS WELL 'CORED YeS ~ AMOUNT 'puLLED; 1220 sacks cement 1175 sacks cement "None NOne ': ,. 30. TUBING RECORD { SCREEN (MD) SIZE 31. PERFORATION RECORD (l~t~r.~ ~ ~ ~)~ ~ ~' ~ ~ ~ ACID SHOT bo~h intervals squeezed ~ ~ >~ r~. ~ ,~ 6000-6360 perforat~o~ ~h~:, de~hthg DAT~ FIRST PRODUCTION .... ' ~' PRODUCTIO~~ ~l~i~g, g~ li]~, ~g~$~ ~ ~ O~ ~) TEST PERIOD 35. LIST OF ATTACHMENTS DEPTH SET (MD) PACKER:/SET (MD) FRACTURE. CEMENT SQUEEZE, 'ETC, AMOUNT AND KIND OF MATERI~L ~USED' SqueeZed with,268 sacks cement Squeezed with 46:7 sacks cament- $6. I hereb,siGNED eertif,,~ ~ "that ~"[-h'e Cf~rego ~i~ ~; _.~. r ~' ~ L/~~ ~~:;;:- and attgched inf~mation,.;:,Os~ ~I,~i~'~°mplet~nd~ Dx~.' o, Dn 11 zng~°"'e' ..... as determinedsupenntende~,~,~o. H.o ~ M~an ~. - a: o u~ u :*(Se~ Instructions ani~paces'~Or AddiSional Dote on Reverse Side) OlVI~iON OF MINES ANCHO~GE WATER--BBL. OIL GRAVITY-APl (CORR.) TEST WITNESSED BY OF.L--BBL. GAS Mcr. WELL STATUE (Producing or shut-in), WATER~SBL. OAS'OIL RA~IO two ~tnga~ · "~ .~ ~ INSTRUCTIONS to G'enera~]his Eorm is desi~ for submitting a~p~ and Correct Well completion revort and lpg on all types'oZ lan~s~nd l~s ~ ei~e~ F~eral agency or a ~ta~e agency, ' ~:~u~_~_~b~ey~_~/~r_~ l~s a~regu~a~ons. ~ny'n~ses~a~ s~ial ~nstru~ti~ns conc~n~the ~e of thi~Zf~m and ~ nmber of copies to be o.~~x-~cuxur~y w~u~ x~ru w w~at, ~, ~ ~on~x~ures ana~pracr~ ~i~ner ~e ~nown oeiow or wm oe ~su~by, or may"~e ob~in~d from, the local Federal ~. o/~e om~. ~ lns~ruc~wns on ~ems z~a~ ~, ~a ~, ~low regarmng sepa~e re~o~ fo~parate completions. l~no~ n ~ prior to the ~me this summary r~ord~ submitS, 'copies of all currently available lo~s (~illers, g~logists, sample and core analysis, all types electric, etc.), forma- tion ~nd Pressure tests, and direc~onal surveys, s~o~d: be at~ched hereto, to the extent requi~ b~ applicable F~eral~]and~ S~te ]a~s and regulations. All attachments sh°ul~ be listed on this form, s~ item 35. -~- ~ I~em 4:' If there are no applicable' S~te r~uireme~, locations, on F~eral or Indian land shoed be describ~ in accordance-~ith F~I r~uire~h~." ~ Consult locd~'- S~te or F~era~offi~ for sp~ific instructions. - .... ~ ..... . l~em ]~: Indicate which elevation is used as refer~c~'.'.(where not otherwi~ shown) for depth..measuremen~ given in o~r s~aces on this form ~nd'~ any attachmen~, I~ems 22 a~ 24: If this well is complet~ for separate~Prdduction f~m more than one interval zone (multiple completion)~s0 state in item:22, an~ in i~m 24 show the producing interGal, or intervals, top(s), botWm(s) and name~s)-.(~ any) for only the inter~g~l~e~ ~ i~m ~. Submit a ~p~ate repo~ (page) on t~ f~, ad~uately id6~tified, for e~h additional interval to be sepa~ly produ~,showing the additional dat~ ~rt~ent to such interval~ ~ l~m 2~: "~acks Cement": At~ch~ supplemen~l id~ds for this well shoed sho~ the de~ils of any multip!~stage ~m(nting~hd the loc~tion of the ~menting' tool. i~em ~3: Submit a ~parate completion re~rt on ~s fPrm for each interval to be[~e~a~ly produc~. (S~nst~tion~or items - 22 and 24 a~ve.) . 37. sUMMARY OF POROUS ZONES: . '~'! "~.. "' ~ .................... >'- · : ~-~SHOW' ALL IMPORTANT ZONES OF PoRoSiTx XNV:COS~Eg~S ~; COREO ~gRV~LS; X~O XLL DRILL-STEM TESTS, INCLUDING 38. ' :-GEOLOGIC MAEKERS -~DE~H INTERVAL TESTED~ CUSHION USED, TIME TOOL OPEN; FLOWING AND SHUT-IN PRESSURES, AND RECOVERIES ~ ~ ~RMATION TOP BOTTO~ ~ ~ -' ' DESCRIPTION~ CONTENTS~ ETC. · .;~ _. -- '~ ~, ~ .;. ~.. NAME : ~ ~ ' ~ MEAS. DEPTH TRU~ ~ERT. DE~B Pe or tions ~queezed: 5040-594~ w~ith 26 sacks cement' ', u ~ ~r~J 6000-636~t, ~ith.. 467 sacks cement' .two stages . , ¥~ ., Hemlock ,,:~.~ 10158 .,." 10~05 '~ ~ ~ "~~ ~~ _' .~ i-~ ~ . - .. 'DST 6370-6800 · " covered 51 bblS~ 7~ water cut dril L~ -. - ' " ~ 0 '' ' -.7 ugged- 70( 0-6 ~ 105 sacks' ;cement. ~ c 69( 6-6800 wit~ 100 .sacks .c~ment ' -~ - ~: · ..... ' ;' ~ C~ .~ Z- ' ' : .... 67~6~6484 uit~ lO0~acks ~ement " ~ ' ~ · ~' ':-~ . . ~ -.'1 ..; .~.- .-~ -~ .: . . -~ .' 63f0-6200 wit~ 100~._acks~,,ent ~ .... : . - ~ . .. - . -- dg pl .... .:~. Brj e ug at 3400' ..... ~: ~ - . ~ .~ :' ~_ , mlock- 6390 ': ' ~ Con , Pos~., oil SS ~';Con . o ~ :- .- ,-~ . - ~' r~cove~~ by prod~teSt. . _~' ~ - '~ C~re ~3 10603 10605 "~c. 2~ Con~ ~'~- ~'" :" ~' ."' .._< · ' . . ; ~ ... ~ .~ - _ .: Core N4 10605 106~_ ... ~c:_ .. 3 1/2' Congl:~ ~ :c ~ c. . 'kM -.- ,. - -~ ~..; . .. ~ ~ .. w ,, -- F'ORM 153 ~.REVS/~2) WELL NO. Kenai Borough [COUNTY) sec. 4 T.9N R. 13W UNION OIL COMPANY DRILLING REPORT Rotary (TOOLS) August 27, 1967 (PERIOD ENDING) CAS~ NG ~CORD ~~ 13-3/8" 61# 3-55 CSA 1077' 9-5/S" 40# and 4S. ~ N-80 & J-55 Buttress Thread CoA '&370 {NOTE INEFFECTIVE CASING) NO, FOURS ~ATE i ' ' DEPTHS FROM TO CONTRA( INCLINATION ;TOR: LOCATI( ELEVAT] MEASURI )N: :ONS: DEPTH :MENTS: CORRECT ANGLE DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS Caldrill Alaska, Inc. OilWell 860 Electric Conductor No. 23 1611' N, 558' W of SE Corner, Sec. 4, T9N, R13W Kenai Borough~ Alaska Water Depth 62' MLLW Rotary Table to Ocean Floor 174' Rotary Table to MLLW 112' Rotary Table to Drill Deck 22.07' Rotary Table to Production Deck 40.82' Ail depths from rotary table RECEIVED OCT 9 1967 DWI$1ON OF MINES & AN~'HOEAGE 'Dist. Drlg. Supt. FORM 153 (REV 5/62) WELL NO. A-4 Trading Bay State (FIELD) Kenai Borough ~COUNTY) sec. 4 T. 9N R. 13W OIL COMPANY DRILLING REPORT Rotary (TOOLS) (PERIOD ENDING) CASING F,:ECORD 9-5/8" 40¢/ & 43.5// C£A u~,~*n' {NOTE INEFFECTIVE CASING) NO. 'OURS DEPTHS DATE ~ FRON4 TO Ju!vj. 1967 1! 12 13 14 INCLINATION J DEPTH tNOTE MAKE 6390t 6390 6367 TD TD ED TD 6390 CORRECT ANGLE INSTRUMEN1 DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS DEEPENING REPORT Started moving from A-! at 4:00 pm and rigged up over A-4 at 6:00 pm. Rigged up Cameron and installed back pressure valve in donut. Removed x-mas tree and began installing spool, riser and BOPs. Finished nippling up and unsealed Baker packer. Circulated mud to work gas out and kill well. Pulled 2-7/8" tubing, removed gas lift equipment, and laid down packer. Picked up and ran drill pipe open ended. Tagged bottom at 6342'. Circulated to work gas out of mud. Mixed and pumped 267 sacks regular class "G" cement using Inlet water and displaced cement with 550 cu.ft, mud. Pulled drill pipe up to 5592~, Mixed and pumped 268 sacks regular class "G" cement using. Inlet water and displaced with 475 cu.ft, mud. Pulled drill pipe Up to 4642' and closed pipe rams. Back-scuttled with 1500 cu.ft, mud using #2 rig pump. No cement returns indicated while back-scuttling. With pipe rams still closed, pumped 9 cuoft, mud down drill pipe and obtained immediate pressure increase from 0 to 500 psi. Shut pump down and pressure held constant for 15 mins. Released pressure and flowed back 9 cu.ft, mud. CiP at 3:45 pm. Opened rams and POH. WOC from 3:45 pm to 12:00 midnight. Ran in hole with 8-1/2" bit, drill collars and drill pipe. Drilled cement from 4742' to 6342'. Drilled up Howco DM retainer from 6342' to 6345'. Drilled on 2" x 22' scallop gun from 6345' to 6360~. POH to run mill. No cement present in casings. 573.O' - 5870'. Ran in hole with 8-!/2" Servco junk mill. Milled cement retainer~ scallop gun and guide shoe, 6360~ - 6367'. Cir- culated out fill below casing 6367' - 6384~. POH. RIH · °~' _, n,"~ scraoar to 6384' POE. ',~h 8-1/2" bit and Baker c~o~..o , . Made. up Howco DM cement retainer with junk pushar o Junk pusher wedged in top of 9-5/8" casing and broke off the bottom of the cement retainer. Ran bit and scraper. . c~Gnt Pushed junk pusher to 6384~ Reran Ho~.~co DMft tainer and set same at 6267'~ Pumped 50 cu. . inlet water through retainer and around the retainer through open perforations and eStablished a rate of 26 cu. ft. 1,53, (~EV 5/62) WELL NO. A--4 Tradin~ Sav State Kenai Borough sec. 4 T. 9N R. 13W UNION O~L COMPANY DRILLING REPORT RO-tg~)Z(T o oLs ) (PERIOD ENDING) (NOTE INEFFECTIVE CASING) NO. OURS DATE FR CN~ TO July..! 1967 14 (~on~'d) 15 16 17 INCLiNATION DEPTH 6390 tTD 6305 ED 6410 _rD 6305 ED 6410 FD 3450 ED I CORRECT ANGLE NOTE MAKE INSTRUMENT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS per minute at I100 psi. Pulled out of retainer, mixed 200 sacks class "G" neat cement with 140 cuoft. Inlet water followed by 10 CUoft. of Inlet water and 324 cu.ft. mud. Closed tool and pumped an additional 290 cu.ft. mud. Pulled out of retainer and up to 6©96". Closed rams on drill pipe and backscutt!ad 17 bblso mud at 175 gpm rate at'250 - 400 osi and lost circulatfOno Picked uR Kelly and circulated out cement do~en t'ha drill pipe with rams open. No other loss of fluid occurred while cir- culating. POH to lay do'c.m Howco tools. Removed tubing head~ installed 7" x 5-1/2" casing landing head (combination adapter)~ WOC. Started drilling cement at 6096' at 4:00 pmo Drilled firm cement from 6096~ to 6267'. Drilled up Howco DM retainer from 6267' to 6270'. Drilled junk and firm cement from 6270~ to 6305'. POH for bit change at 6305'. Drilled junk and cement from 6305' to 6370~ ( no cement 6370" - 6390'). Drilled junk and formation from 6390' to 6410'. Unable to pull up to make connection. Worked stuck pipe. Drilled back up into shoe. POH. Marks on drilling as~'emb!y indicate junk in hole above bit and stabilizer. RIH with.Baker retrievable plug and set same above top (squeezed) perfs at 3045' - pressure tested to 1800 psi~ ok.- Unable to release from plug with setting tool. POH.. Ran in hole with new plug. Set plug at 3450'. Tested to 1800# for 15 minutes, ok. POH. Released rig for move to A-1. DIVISION ENGINEER FORM 153 iREV§/62) W?LL NO. A-4 Trading Bay State Kenai Borough (COUNTY) ~,%T SEC. 4. T. .,~ R. ]_~? B.& M. UNION OIL COMPANY Rotary (TOOL.S) (PERIOD ENDING,) CASI b.'G ~CC~D (NOTE INEFFECTIV~' CASING) NO. TOURS DATE lJu..iy, i!9.67 22 23 24 25 26 3450 6534 6792 6824 DEPTHS TO 6410 3450' 6534 .I 6792 INC LINA T ION TD ED DEPTH CORRECT ANGLE DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS Moved rig from A-i. Rig centered over A-4 at 3:30 pm. Installed spacer spool, riser, BOP equipment and choke assembly. Tested BOPs to i000 psi for 15 minutes, held ok. Ran Baker retrieving head and latched onto Baker bridge plug at 3450'° Pulled same and picked up bit and drilling assembly. Ran to bottom and drilled on junk for 1 hour. Drilled formation 6410' - 6534'. Mud: wt 82, vis 43~ wl 5.0, sd 1.5%~ ph 12, oil 6% Drilled and surveyed 8-1/2" hole from 6565' to 6768'. POH, picked up bit #7 and ran same to bottom. Drilled 24' before driller related that an 8-5/8" bit had been run inStead of an 8-1/2" bit. Ran survey and found vertical angle had dropped .5° in 42' from previous survey. POH to pick up 8-1/2" bit. ~ Mud: wt 80, vis 39, wl 5.0~ sd 1-1/2%, ph 11.5, oil 8% 6824 POH, picked up 8-i/2" bit; ran same to bottom. Drilled 8-1/2" hole from 6792' to 6824'. %~en pipe started to torque, attempt was made to pull up, but . ipe was found stuck. Tried to work pipe free, but attempts w~re un- successzu±. Ran Dia-Log free point indicator and found free point at 6708'. After one misfire~ backed off at 6708'. POH with fish and recovered 9 drill collars and ~ ! bumper sub. Picked up jars and bumper sub and ran in hole I t to screw into fish at 6708'. · ) [Mud: (same as 7/24). 6824 t(fishinj) iFinished running in b. ole and screwed into fish at 6708. Jarred on fish 4 hrs. without moving same. Ran free 'i~ point indicator and backed off at 6741' . ~u~ and recoverec steel drill collar and 8=!/2" stabiiizer~ . ~==v~,o steel drill collar, 2 monel, 2 stabilizers and bit in hole. Ran back in with jars and bumper sub; circulated hole clean at top of fish~ and screwed into fish at 6741'. Unable to circulate after screwing into fish 2-3/4 hrs. with no movement~ then jars failed. Ran Die-Log free point indicator and backed off at 6794'. Mud: (same as 7/24). DIVISION ENGINEER FORNt ID$ (REV WELL Tradin~ Bay StstP ~xen~i Borough (COUNTY) ' SEC. 4 T. 9N R. 13W ~.~. UNION OIL COMPANY DRiLLiNG REPORT Rotary ~(TOOL$) (PERIOD ENDING) CAS]D4G ~NOTE INEFFECTIVE CASING) NO. I DATE TOURS I July? 2 27 2 28 2 29 2 30 2 31 DEPTHS i I,",1C L IN A T ]0 N 1967 6824 6824 6824 6824 6940 TO ! DEPTH 6824 6824 6794 6824 6940 7194 NOTE: MAKE: 0 (fishin CORRECT ANGLE INSTRUMENT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS POH and recovered 1 steel drill collar, 1 monel drill collar, and 8-1/2" stabilizers leaving ! monel~ one 8-1/2" stabilizer and 8-1/2" bit in hole. Waited on arrival of new jars then ran in hole with jars, and bumper sub. .Screwed into fish at 6794'. Jarred on fish for 2 hours at 310,000#~ but could not move fish. Ran string-shot and backed off at 6794'. POH and picked up 8-1/2" bit plug 8-1/2" stabilizer. Ran in hole and circulated in singles from casing shoe to 6794'. Circulated for one hour on top of fish at 6794'. Mud: (same as 9/24). POH and picked up one joint of 8-1/2" wash pipe with tungsten-carbide washover shoe. Ran in and washed and milled over fish from 6794' to 6823'. POH and stood back washover pipe. Ran back in and unsuccessfully attempted to screw into fish. POH and picked up over- shot with 6" grapple. Latched onto fish at 6794' and jarred with 350~000#, but unable to move fish. Over- shot pulled loose. Attempted~ but failed, to latch back onto fish. Began to POH. Mud: wt 79~ vis 39, wl 4.8~ sd .5%, ph 10.7, oil 6% Finished pulling out of hole leaving overshot and bottom half of bumper sub in hole. Ran back in, recovered bumper sub and overshot, then POi{ with same. Ran in with 2 joints washover pipe and shoe. Washed and milled over fish from 6794' to 6824''when washover shoe stopped drilling. Jarred on fish '~, ah 320~000# when fish came free. POH recovering all of fish (monel drill collar, 8-i/2" stabilizer and 8-1/2" bit). Picked up bit and drilling assembly and started in hole. Mud: wt 80, vis 37, wl 4.9, sd 3/4%~ ph 10.5, oil 6% Drilled and surveyed 8-1/2" hole from6824' to 6940' with bit changes at 6792' 6871' and 6940~ Mud: wt 80, vis 4%, wl 4.8, sd 1%, ph 10.5, oil 7% Drilled and surveyed 8-!/2" hole from 6940' to 7194' with bit change at 7080'. Hud: wt 78, vis 43, wl 4.7, sd 1%, ph 10.4~ oil 7% DIVISION ENGINEER FORM t53 {REV ~/62) WELL A-4 Tradinz Bay State /COUNTY) sec; 4 T. 9N a. 13~? B.&M. UNION OIL COMPANY DRiLLiNG REPORT '"(TOOLS) (PERIOD ENDING) CASING RECORD {NOTE INEFFECTIVE CASING) NO. DATE TOURS Auc~ 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 2 !0 DE PT HS FIR OM i967 7194 '7433 7966 8193 8532 8770 9023 9159 9403 TO 7433 7729 7966 8193 8532 8770 9023 9159 9403 9551 INC LINA T ION DEPTH CORRECT ANGLE INSTRUMENT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS Drilled and surveyed 8-i/2" hole from 7i94' to 7433' with bit changes at 72!4w and 7433'. oh 9 5 oil 6% Mud: wt 77, vis 42, wl 4.8, sd 1%, . . , . Drilled and surveyed 8-I/2" hole from 7433' to 7729' with bit change at 7700'. Mud: wt 78, vis 40, wi 4.8, sd 1.5%, ph 9.0, oil 7% Drilled and surveyed 8-i/2" hole ¢ :: 7729' to 7966' with bit changes at 7835' and 7985'. Mud: wt 77, vis 45, wl 4.0, sd 1.5%, ph 9.0, oil 6% Drilled and surveyed 8-i/2' hole from 7~o~ to 8193 with bit change at 8!82'. Mud: wt 77.5, vis 40, w! 4.2, sd 1%, ph 9.5, oil 6% Drilled and surveyed 8-1/2" hole from 8193' to 8532' with bit change at 8392w. Nud: wt 76.5, vis 44~ wl 3.6, sd 2%, ph 10, oil 8% Drilled and surveyed 8-1/2" hole from 8532' to 8770' with bit changes at 8542' and 8770'. Mud: wt 75;5, vis 40, wl 4.4, sd 1%, ph 9.5, oil 6% Drilled and surveyed 8-1/2" hole from 8770' to 9023' with bit change at 8969'. Mud: wt 74,~ vis 41, wi 4.4, sd 1%, ph 9~ oil 8% Drilled and surveyed 8-1/2" hole from 9023' to 9159' with bit changes at 9089' and 9157'. Mud: wt 74, vis 44, wi 4.4, sd 1%, ph 9.4, oil 8% Drilled and surveyed 8-1/2" hole from 9159' to 9403' with bit changes at 9329~ and 9403'. Mud: wt 74, vis 4!~ w! 4.4, ph 9.5, sd 3/4%, oil 6% Drilled and surveyed 8-i/2" hole from 9403' to 9551' with bit changes at 9479' and 9551'. Mud: wt 75~ vis 44, wl 4, sd 1%, ph 9.5, oil 7% DIVISION ENGINEER / : FOR, M '~53 (,~'_V 5/52) WELL B.&M. UN~ON OIL COMPANY DRILLING REPORT Rotary "(TOOLS) (PERIOD ENDING) CASI iqO (NOTE INEFFECTIVE CASING) NO. I DATE TOURS J 12 13 15 16 DEPTHS F'R OM TO 1967 9551 9700 9881 9969 10163 10198 INCLINATION 9700 9881 9969 10163 10198 10231 DEPTH iNOTE MAKE O~ CORRECT ANGLE INSTRUMENT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS Drilled and surveyed 8-1/2" hole from 9551' to 9700' with bit changes at 9643' and 9700'. Mud: wt 75, vis 40, wi 4, ph 9.4, sd 1%, oil 5% Drilled and surveyed 8-!/2" hole from 9700~ to 9881' with bit changes at 9776' and 9881~. Mud: wt 76, vis 42, wl 5, sd 1%, ph 9.5, oil 5% Drilled and surveyed 8-1/2" hole from 9881' to 9969v with bit changes at 9929~ and 9969'. Mud: wt 74, vis 41, wl 5.1, sd 1/4%, ph 9.4, oil 5% Drilled and surveyed 8-1/2" hole from 9969' to 10,!63' with bit change at 10,069'. Mud: wt 76, vis 45, wl 5, sd 1.5%, ph 9.4, oil 2% Drilled and surveyed 8-I/2" hole from 10,163' to 10,198' · with bit change at 10,198~. While running in with bit no. 35, bit stuck at 7198]. Pulled and jarred down on bit, but unable to move. Spotted 50 bbi "Scot Free" over fish~ but still unable to move. Rigged up Dia-Log and ran freepoint indicator. Found free point at 7044'. After one misrun~ backed off and POH. Found bumper sub had backed off at 6850'. Started back in hole with bumper sub. Finished running in hole and latched back into fish at 6850'. Ran free point and attempted to back off but had'misrun shot. Replaced shot and backed off at 7044'. POH and recovered bumper sub, stabilizer, 6 steels and stabilizer. Ran back in hole with bumper sub, jars and i6 collars. Latched onto fish at 70444. Could not get ljars to operate at 350~000#. Waited 2 hours; pulled up ltD 370,000# and fish began to move. POH and recovered fish (8-1/2" bit~ 26' mone! drill collar, ztabilizer~ 2 steel drill collars~ stabilizer% and 2 steel drill collars). Laid down jar and ran in hole ~ith bit. Reamed and circulated bridges from 7044~ to 7028' then cleaned out 55' fi!lup on bottom. Drilled and surveyed 8-1/2' hole from 10,198~ to 1©~231'. Mud: wt 75.5, vis 45, wi 4, sd 2%~ ph 9~ oil 6% DIVISION ENGINEER WELL NO, A-4 T~:adin~_~__Bay State W:t£LD } Kenal -o ~ oux, ,~ ~COUNTY) sEC. 4 T. 9N R. 13W B.&M. UN~,ON OIL COMPANY DRILLING REPORT Rotary (TOOLS) (PERIOD ENDING) {NOTE Ir~EFFECTIVE CASING) NO. ;TOURS . mATra Ane,,:.z~ 1967 17 10231 iS 10272 19 10360 20 10467 21 10510 22 10603 23 10605 DEPTHS INC LINATION CORRECT TO DEPTH ANGLE CNOTE MAKE O~ INSTRUMENT 102721 10360 10467 10510 10604 10605 I' 10609 DETAILS OF OPERATIONS, DIgSCRIPTIOi',,I;.5 AND Rr--..$ULTS Drilled and surveyed 8-i/2" hole f=c~ 10,231' to !0,272'. Circulated to condition hole and made short trip before logging. POH and rigged up Schlumberger. Ran 1ES, CDM, and Borehole Compensated Sonic logs. Finished logging and taking Sidewall cores. Rigged down Schlumberger and ran in hole with bit. Drilled and surveyed 8-1/2" hole from 10,272' to 10,360'. Mud: wt 76, vis 40, wl 4, sd 1-1/4%, ph 9~ oil 7% Drilled and surveyed 8-!/2" hole from I0,360~ to 10,467' with bit changes at 10~360' , 10,429 and 10,467'. Mud: ~t 76, vis 40, w! 4, sd .5%~ ph 9, oil 6% D%ii!ed and surveyed 8-1~2" hole from 10,467' to 10,510' with bit changes at 10,503~ and 10,510~. Mud: wt 76, vis 41, wl 3.8, sd 1%, ph 9, oil 8% Drilled and surveyed 8-1/2" hole from I0,510~ to 10,604' with bit change at 10,565'. Started circulating to condition hole for logging. Finished circulating for logs, POH, and rigged up Schlumberger. Ran 1ES and Dipmeter surveys. Rigged down Schlumberger and picked up core barrel. Ran same to bottom and cored from 10,603: to 10,605' when core barrel jammed. Started out of hole to lay down core. Mud: wt 77, vis 43, ~1 4, sd 3/4%, ph 9, oil 7% POH and laid do~n core no. 1. Cut and recc...'ered 2~ core (sandstone conglomerate). Ran in hole ~itk core barrel and cored from 10,605' to 10,609'. POI{ and laid doyen core no. 2; cut 4' core - recovered 3.5~. Ran in hole open ended with drill pipe. Mixed and pumped 126 cu.ft. class "G" cement plus 2%.CaC!2 mixed ~ith Inlet water. Displaced cement with 665 cu.ft, mud. Pic!ad up bit, Ran in hole to 6170~ and ~aited on cement. DIVISION ENGINEER FORM '153 (RFV 5/62) · . WELL ~0. z ....... .,_ n~ ~_~%¥ State Kep-.ai ~orough ~COUNTY) sec. 4 T. 95! R. !3W B.&M. UNION O~L COM2ANY DRI~-~"NG~..,., REPORT Rotary "(TOOL$) (PERIOD CAS~, NG RECORD (NOTE INEFFECTIVE CASING) NO. OURS D. ATE ). DEPTHS Au~us~ 1967 24 , 25 27 TO 10609 10609 6800 10609 6800 10609 6200 'i INCLINATION CORRECT DEPTH ANGLE [NOTE MAKE 0~' INSTRUMEN'f TD TD ED TD ED TD ED DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS Finished running in hole from 6170'. Ta ..... ed top o,~, cement at 6932~. POH with bit and ran i2 hole open ended to 6906~. Mixed and pumped 120 cu.ft, class "G" cement plus 2% CaCi2 with Inlet water. CIP at 2:15 am. Ran in hole and stood cemented. Finished waiting on cement, ran in hole frora 6306' and ~ouqd,top of c~m. ent at 67!9'. Drilled cement from 6719' to 6800~; circulated hole c!ean~ and POll. biade up DST assembly and ran in no_e with DST #i Set packer at 5989~ and 6275'. IF 15 min; iC!P I hr.; FF 2 hr. Opened tool with very weak blow which died in 5 minutes. Reversed out and had mud to surface in 1 minute. Released packers and pulled out of hole. Found CIP valve im- properly installed. Ran in hole for DST #2 and set packers at 5989~ and 6275'. When tool was opened, mud in annulus dropped approximately 40'. Picked up and shut tool in, Laid down one joint drill pipe and reset packers at 5959' and 6245'. Packers held ok. IF 5 min; !CiP 1 hr; FF started for 1 hr, 40 mins. Tool opened with weak blow. Continued FF for 6 hfs 20 min. Blow continued weak throughout test. FCIP 2 hrs. Reversed circ. DST tool and recovered 51.5 bbls water cut drilling fluid. Re- placed packers and pulled out of hole. Ran in hole open ended to 6476'. Mixed and pumped 120 cu.ft, class "G" cement. CIP at 3:00 pm. Pulled out of hole and waited on cement 6 hrs. Ran in hole with bit and found cement top at 6484. Pulled out of hole. Ran in hole open ended to 6380'. Mixed and pumped 120 cu.ft, class "G" cement with 2% CcC12 using Inlet water. CIP at 1:30 am. POH and picked up 8-1/2" bit. After ,wai~i~ on cement ~ ~_,~,.,~,~ , ~ ,~ Ya~n in. hole and t~'~o~ t~o of cement at 6200~. POH and ran in hole with drill_ Dine and Howco 9-5/8" CI brid~e j~lu~. Set brid~e piu~,.; at 3400'. Pulled out of hoie, rigged do~-m riser and BOPs. Installed 1/2" plate o~,er~ well. Released ~','~_o at 12:00 noon for move to A-7. DIVISION ENGINEER ': ~.:~ ALACAL DIRECTIONAL DRILLING ORP.. ~ 888 No. Main Street · Santa Ana,'California' 92701 SHill'.. ("UIUUDCOURllDEVIATION VERTICAL DE~H cou.se 'DIRECTION CO~RS[,' , ~ ~ ', , ' ..',,, , , ., , r OF LATITUDE DEPARTURE 6O3 ~_ 0 O0 603_ 00. 0 O0 ~T:[C ~L .... j ! 753 . ! 39, ...J 752'J97' '~JAi~N~ 35 ~ J ' 6~ g~ II L ~ ,L 6 30~j, I 8 1090 ill 15~[J 1087 .00 16:j 6h g~ j I ...... l 1256 iJ~ ooj -' , 12k8 ~8 20 0~. 57 ~ ~ ; i l ~&O ~3~30 ~26 73 ~8 9xJ 65 z , 1! 65 22 ' 109 1525 J12, 30, ~509 72J 18 kdJ. 76 g j ~', JJ 69 67 ,':TYPE OF GURV.EY: ....................................... CALCULATED BY. .. ....... ',~ ..... CHECKED BY-~ -". ......... ,7~:~ . ALACAL DIRECTIONAL 888 No. Main Street * Santa Aha, California 92701 , ,, SHEll' NO 2/~ ~-~ .. ,~I~]:L 1967 COMPANY ~II.0N 0IL O~~ . , , , · ~. ...... ~ ,,, ........ . ....... :... WELL.~~ A--~ ....... LOCATION ~A~ ~A~ COUNTY .~T '~~ .... STATE J~J ..... _ , ~. ,~, .... ;,', , ,. ,, , , . _. ~ , _ , ': , . , , .,, , .- , , ~, , ~ ' ~ ' ~' , ' ' ' ' " " ~] ' COUESE · '~ . TOTAL' ' ...... "IAIURID COUR~ DEVIATION VERTICAL, DE~H ..... cou.s~ DIR ION ~ 'LATITUDE ..... DEPARTURE' ,. '- ~ATITUDE ....... DEPArTUrE '' ~6~o .~2 oo~, ~ ~66~ 22,~9 ~3. ~ 76_.~ ......... ~ ..... , ~.~:~_ _. ~ ~ 18~6 11 ...... 00 181~ 35_ 29 77 ~~~. - ........ ~ .... ~ 80 187 8 1930 _ ~11 30 1906 A6 18 7& ~~~ .... _ ~ ..... ~. ~2088._: 12 15 '2060 86 33_ ~3 N 83 a . _ , _. ~~ :.._ 239. 32 · 2~0 .... 12 30 . ~092 10 6 93 N 83 R . QL 2'.5 ...~ 2&6 '2~..... -' - , 'i ~ _ 97 07 260_7~_ 2220 .... 6s., I_o8 [ i', 27~_ 39 23~ 17 00 I ' , 2596 ,5 Z5 ~t ...... , ....... I~ .... , ~ --/ ..... , .... ~_ _ ~? '372_~ , ~, ,. ~ -. , ~ '~ ,.. _. ~i ~ ..... ' ' / ' ~ I i ' ' ~, ~ ..... 3250 ,,, ~13 ooi~ ,318~ 19 31 30 ~ 66 ~ ~ ; ~ ~ ~__;' 173196.. . 520 3339 12 &5~ .1 ~ ~ ~ 181~ 63 538 6~ 3515~ ~ ~1 39 && 07 N 69 , ~ ~ .... ~ ...... ,: . 3710 ' 11, 3632 ~ 39 71 N 71 E ~ , ~ i 210 36 [[ 617 37 . ,,,' , , ' ,, ," ,, ," .. .. ,, ~ . , , - . , ,, , , TYPE OF SURVEY:, CALCULATED BY ...... CHECKED BY ':" ALACAL DIRECTIONA RILLiF, IG CORP, .~°m #o. ...... "~' ':I:~:~ ~lsT '" 888No. MainStreet '; SantaAna,'California92701 ' '$#ilTNO. 3/ ~R~ 1967 . ' COMPANY ....... , 0~ ~!~ C0~~ . . ADDRESS, ". ..... wELL~~ ~'~ ...... LOCATION ~~ ~' COUNTY.. ~[ ~0~0~ ...... STATE .. ' , - , . ' -- .' ,' ~ J ~ ' ;, ' ' '; ' - ' ~ ~ ' , '" ' ' , ~ ~ ....... " , 2' ,"' _ '" , .... " , '- ' , DIRECTION COURSE TOTAL '. ...... ~AI~=D~'COURIiJ'DEViATiON" vERTJ~'AL DE~H COUR,. ~" OF LATITUDE DEPARTURE - LATIT'UDE ' ~ DEPARTURE DE~H ~HGTH ANG~ COURSE ~ TOTAL DEVIATION t DEVIATION, "' NORTH 8OUTH EAST j ' WEST - ' ~ NORTH ; =OUTH ] ~'' EAST' 3960 6 30 3B80 3~ 30 ~ ?0 ~ ~ _ ' '.'5 , 3 .~ ' · .... ,.... 5 ~5~_ .]~071 1~.~7 L~N 59 'E ~' ~ ~ ~ _~_~7: 668 ~369 .... 2 3'0~ . A2.8892 q~tS1N 25 ~ _~ ~~ ~" A.o ~630 '5 O0 , ~5~9L~ ~5 69:~ ~8 ~ . ~o ~ AA~ 9I 6 28N ~~8 W I ~ ~ ~5 ./:~ 66675 1 5002 3 00 _ ~920 Ao A.81 25 ~: ' ~n~..~3 .... ~ &59: 50:87 3 oo~ ~.: 5005 5503 ~ ~5 ,r ~_ t ~ ~'20 8 9 86 N 06 E / i . .-- I~ ____ 652 569o 5 L5, .... 5606 65 769 zo }j595h 5 00 5869 68 ?06 ~ _23 I I 3~8 17 ~ 662 OO__ 6130 '] & ~5 60~5.~8 ~ 57 N g& E - ... 358 65 _ . ~... 672 !3 _ 6229 ~ 5,&5 61~3 58 9 92 N ~ E ~ ~ H 363 61 ~' 680 72.. ~'" ,., , - , ' ' - . , , . , ' , , ,,, ~ TYPE OF gURVEY:.. CALCULATED BY ,CHECKED BY , ~'-:~ ALAOAL DIRECTIONAL DRILLING (~ORP. Jo~ .ct ...... ~,~ 888 No. Main Street · Santa Ana,.Califomia 92701 'SHEET NO. ~/~ APRIL 1967 COMPANY gl~0N. 0IL ~0~A~ , ...... ADDRESS ,, . . WELL STA~ A-& .... LOCATION TR~ING BA~ COUNt' ~ANI BORO~ ,STATE- - ...... ' ' ..... '" .... ' ' '" " -:- COUR'S'E ' ""'~_ ' ' ~ ' '' ' TOTAL ' ' ...... MEAtUMD COUR~ ~ DEVIATION --- VERTICAL DE~H COURSE DIRECTION ~NGTN~ ANG~ ~ C~ DEVIATION OF --- L~TI~--]'~ DEPARTURE .... · LATITUDE "" ,' ....... DEPARTURE 62gA _ ,_ 5 &5 6208 25..6 5Z,~ 66 ~ _ _~ :1~~ ..... ~66 26 686 ~~ - .. ,, ~63&6 5 30 6260 Ol ~ 98 N 66 . ~ 368 29 ' 6912~ 6390 5 00 6303 8& 3 83~'N 65. ~E~. 369 91 , ' O;OS~I~ N. ~1:~ ;8, t E j ............ , ........ I ~ -' I ' ii' tie ' ~ -- J I: Il , ' . · , .... , , ' ...... ., i' ., , , ' TYPE OF SURVEY' cALCULATED BY CHECKED BY. UNION OIL COMPANY OF CALIFORNIA TRADING BAY STATE No. A- 4 KENAI BOUROUGH., ALASKA ALACAL SCALE: I"=100' 6~,90' M.D: 6303.84' V.D. N. 369.91' E. 694.69' COMPANY._ ALACAL DIRECTIONAL DRILL[~G CORP. 888 No. Main Street - Santa Ana, California 92701 OIL ADDRESS SEPTF~BER 1967 A-l.~. ( DF,.,' ,PE~.,I~IG) LOCATION COUNTY J~NAI 3()ROUGil AL/~SKZ STATE llz DEPTH 6390 DEViATiON VERTICAL DEPTH' COURSE DIRECTION OF AN,GL[ COURSE TOTAL DEVIATION DEVIATION 6303 COURSE LATI TU DE DEPARTU R E NORTH SOUTH EAST TOTAL LATITUDE DEPARTURE WE~T .6503 _ 7700 78'35 7958 gl18 8182 ,8271 6662 6981 7!2~ 7/~3t 7609 7867 8026 8o9o 8179 TYPE OF SURVEY: CALCULATED BY ..... CHECKED BY, · ,""'" --" ,? L~{ {il 'p '"x, " '.,<-~'7"~n ,, ALACAL DIRECTIONAL DRILLING CORP. .~L~~ 888 No. Main Street · Santa Aha, California 92701 COMPANY, , _ ~., r~_.L ~'~r~& ~",~ ADDRESS , s.m' .o 1/ SMPTFMBER 1967 W~L~:) J.. .... i, ~--]~ , COUNTY 'ou. ~J O[ViATi°N']-- · VERTICAL DEPTH' cou.s£ DIRECTION ' COUr~SE J ' TOTAL II I · ~'J ,J" OF LATITUDE ' DEPART'URE '" LATITUDE ' i DEPARTURE ,ENO-TH I ANGLE COURSE TOTAL DEVIATION DEVIATION ~ SOUTH EAST WEST NOR H [ SOUTH l-- EAST - ,, ' ' I 701 5] 6303 8h, ,~3 83 N 65 ' z '' '" ?R~ 69 ~ e)M U O' lo :,UR 71 gS- ' _~ 3Q 6376 50 7 00 r! 77 ~ ..... __~_~ 30 6~16 32 3_83 N. 77 . E . ~ . 372 3A ~.l 705! 2L I_ ~ ~o ,. 6A77 04 5 85 N 79 E 37~ &5. . 71C 9~J , , . ~ ~,,, ..... . ..... ~2g_ ''6569~6~ ¢, 91 N ¢0 ~:=~, ' :'575oo..... 7~9'7~ ....... q 30 6662 ]_g 8 91 N ~1 ~ 376 39J 728 56 ~__iO[~ 670% 02 3 66 S5 E _ I . 376 71 '732 I.~ i5 6766 ,76 5_!61 J E,~sg, 376 71 737 97 ~__~ 00 6851 44 ?,41 EAST 3?6 71 ?g5 3~ ~ - . .,. .' O ..... 5 30 6981 ga 12 82~ ~,.-~T ..... 376 71 75~ 2C ..... , . ......  ~o~ ~9s~ 83 ~: , 374s~ 78567 3 30~,J ~ 7609 65J !0 gE S 65 Z' 370 23 795 5' ~ I ! -- ' ~__~ 2 3 S090 81~ 2 7~ S 59 ~ 35~ '6~ SiS 2l~ ,,... jl . .._ , 6390 _6657 7700 7,335 7958 glib 182 o~71 TYPE OF S~JR¥'EY:__, CALCULATED BY ....... CHECKED BY. ALACAL DIRECTIONAL DRILLING CORP. .. Jo~ ~:o.. , 1' ~ 888 No. Main Street * ' Santa Ana, California 92701 · · s,~T.~o, 2/3 ~ ~'r~ ' s~ ;~w~lo. VERTICAL DEPTH cou.s= DIR~]ION COURS~ _ TOTAL -  ~GL,= ~ ' , LATITUDE DEPARTURE LATITUDE DEPARTUR~ TOTAL DEVIATION ' ' 82 B ~6 [ ii ' I ' ' ,, r,, I -- -- ~ ~ ~ ~ ~ I 3&8 i69 _ 826_4. Q . o_ 30 ~_ ..... }33 F8 ~ . .... i ? 15 887~ 65 25 1].~8 !3 ~ ~ 295...&5 j · 83~ 2~ - - i .... i , ~, _ , .... 7 '~ ~ °71 '79 826 13. ..; 9060 9~. 9 17.S 23 I~' J ...... ~ . .... -- __ ___ 8_ 1~[ 930~ 60 10 62 S 37 ~V 2A3 8& 807 10 __8_ 00 ...... 9379 86 10 58 S 37 l~ 235 39 800 73 ,  ..... 71~.~' j/~5~ ao 9 7~ s 23 r . 2as 29 -~ ........... 79& ~_.~ *.~ 95A2 25 i3 20 s ~,.7 v] 219 28 78~ ~5 __~ 30. 9598 62i 8 ~ 3 S I 5 5 -- ii ~ 21L 21 .777 72 , 8 30~ . 96?3 79 !I 23 ~.52 ~'i[ 20? 60' ?68 63 ~] I ........ 9 5 [. 9777 ~2 16 87 S 56 ~.~. 198 16 75~ 65 s 3c.i 9S6~ ~5 ~3 O~ s 56 ],v ~90 88 7~.3 t ..... , Z 877O 09o9 9t57 9329 9'.03 9&79 955.]- 96z~3 9700 9'776 9581 5969 .C069 ~o336 TYPE 01:' ~I. JRVEY:. CALCULATED BY _CHECKED ':4;!:~:!;(.~.~x ALACAL' DiRECTiONAL DRILLING CORP. ~ aw .......... ~[~"~',,~ 888 No. Main Street * Santa Ana, California 92701 ' , ,~ . I'' N~ OF I I - LATITUDE r_'DEPARTURE LATITUDE [ I DEPARTURE ....... . , ~~~.. ..... , , , TYPE OF ~;UR'VEY: ........ CALCULATED BY CHECKED BY. UNION OIL COMPANY OF CALIFORNIA TRADING BAY- STATE- No. A-4 ~ DEEPENING Troding Boy, Aiosko ALACAL SCALE: I"= I00' ~ FROM PREVIOUS SURVEY 6390' M.D. 6303.04.' V.D. N. 369.91[ i0565' M.D. i0 4.48.94' V.D. N. 155.86' E.634.67' COMPANY._ · ALACAL DIRECTiONAL'DRI-LLIN® CORP. 888 No. Main Street · Santa Aha, California 92701 UNION 0IL C0?,?PANY ADDRESS SEPTP,},~fB ER 1967 WELL~-'' ........ A-lk. (t3EEP'm, NtNG} LOCATION_L,~ro'D ~i-lT'~.l-,'~L,.jj :',,z ,'~ ~"Y- COUNTY ~,%FAT,, ~OROTT~T'-T ' STATE . ALAS~A ~"""'""":" i~°"'"'"'l ,=,,,A-,',oN , v~'rjc^- ,::,~ ',-,-, ' D,R"CT,ON COURSE 'OF LATITUDE DEPARTURE .. L?TITUDE DEPARTURE LEN(i'THi _- [ COURSE '~ T TA DEVIATION NORTH , ii. SOUTH EAST WEST NORTH SOUTH l~_ 8273_ 5 33 ~-5].~- -;~ ....... 3&8 69 826 AO .... ; l~ _____/~l~ . 'g399 !7 989. $ 38 :_F__, .. . . _ 3/+_¢_..90_ 832 l+9_ / ""~ 333 58. 836 72 _:~ .~_5. 0__0_ 8/.,.9580 8 _A.5_ S 30 ~ . · · 87?0 30 86?? 2l, 1~ ....... 28 S 17 .E __~__~ 92 gl,.,,.,"' __&9_ r/~ .... . ....... '835'25 _9..~0~_~9 7 z.~,. "i_. .. 8993 56 16 .'1-9 s 20 _Y.; ' { ..2gO 23 829,'72'.~ _.9!.57 '? /+,.;~ . 9060 9& 9 17 S .23 ¢,' _ . _ 271:79 . . 82 9329 .. _~!. A-5 9231 37 23 20 $ ~ v 252 .33 . _ 813' /+5 "/ 5~z~03 NS_ 15 .. 930z~ 6o' 10 62 s 37 3? ... 2/43 8& _ 807 10 9k79 }_% oo 9379 86' i0 58 s 37 w 235 39!. 800 ?3 ............... ]F- F 225 ...29 955! , L 7 /4.5__1 9~,51 20 9 71 s /+3 ¥: I~ ~ 79/+ 11 _ ,_ , ...... ......... Is -,5 ,,: ., ,. ,,. '"!-----iF--- ~ilI "' .I 219i 28[ 78~ &5 v/ t _9776 . 9673 11 23 s 5/, ';: 207 60 --- I " .I I 768 63_ - I----1,h= ~" " i" '~ ~ ..... ~ -I -~9~ ~6, 75z~ ,5 / ~ 18/+ 21 730 1~v' .0193 i , ¥ uui 10090 70 20 15 S 67 , 176 33 711 61 . ~., TYPE OF SURVF'Y' CALCULATED BY , __CHECKED BY ".,~,::~.~,:~ · ALACAL DiRECTIONAl[. DRILLING CORP. ,. ~ '~" 888 No. Main Street · Santa Ana, California 92701 W~~-... , A- ........ T,~,'~'' ~ T w0 TTG~ STATE ,, OF LATITUDE D~PARTURE~ " LATITUDE ~ LANGTH~ ~ NORTH : SOUTH ' EAST WEST NORTH ~ SOUTH · EAST 'it WEST i0~6'~5' .... ~ 00 !0353.~,5 29 &71S_~~ , , · . 161 95 . 655 : ' ~ " 10565~_ 13,00~,, I., ].Ot~8 9l~: 22 05 $ 7l~ ~~ , 155 88 I 63l~. 6~ I,, . I CLO:3U:~E:~ N, 760 1:~, _E 653 ;~' -- , ~ ~-..~ _~ . . , ~ · ....... ~ - ,, , , . ~ ~ ~ _ . .... ,, , i .... .. , ... [ -' [ -, .., TYPE OF SURVEY: CALCULATED BY CHECKED BY UNION OIL COMPANY OF CALIFORNIA TRADING EIAY-STATE- No. A-4 (, DEEPENING Troding Boy, Aiosko ALACAL SCALE: I"= i00' FROM PREVIOUS SURVEY (.APRIL 1967) 6590' NI.D. 6303.84" V.D. N. 369.91' ~ . i0565' M.D. 10448.94' V,D. N. 155.86' E.634.67' TO ,. State O£ Alaska AT xnn] Porc~pi~a RFCF FROM Union Oil Company 0C'i · ., 'I,967 Anchorage DIVISION O1:MINE5 & MINE:PALS TRANSMITTING THE FOLLOWING: I UNION TRADING BAY STATE A-4' .. 2 Directional Surveys, ~ 639( -10565 ,, 1 COre Description (Cores 5~4) .- 1 1ES, Final lo~ (Runs 1-5), Blue line 1 " " " (" i-S), .Sepia 1. b~.g Core Chip, C~re #3~ 1060S' 1 b~.g " " Core #3, 10604' 1 b~.g " " Core #4., 10606 1. b~.g " " Core #4, 10607' 1 b.~.g " " Core #4, 10608' UNION TRADING BAY STATE A-7- 2 b~xes Core chips, ~8S7-4081' and 48S3-6~8S' ,, ,, FORM ~'08A 1~/52 PF:INT£D IN U.S.A. . DATE coR[ SIZE & TYPE[ FROM TO NO. ~ARREL R E'C' iVI$10N OF 'NON OIL COMPANY OF CAI. IFC' CORE RECORD TOTAL REC'RY GOhlPANY---i ......... ' ' ' ----"' ........... LEASE __ _LOCATION_{'&- SHALE OIL SAND GRAY SAND SHELL DESCRIPTION OF CORE: _ .... Y/ELL APP' T DiP OF HOL Form No. STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Effective: July 1, 1964 LAND I"IFFII~' LEASE NUb4BER LEASE' OR IJNIT NAME LESSEE'S MONTHLY REPORT OF OPERATIONS Tl, e followir~ is a eorreo, report of operations arid prod~etior~ (inel~dir~ drilli~ff and prod~ci~ wells) for ~ke mont~ of ___::~g~_~'~_ ......................... 19.~_ .............................................................................. ~e~t's address __~_O_7___~,___~h~rn__~gb~__~_, ......... Compa~ ___~~_.~_~__~p.~_~.__O.~. ................ Phone ......... SEC. AI~ D~s. CU. Fe. o~ GAS GALLONS O~ BARR~LS O~ REMARKS ~ OF ~ ~W~. RANGE ~ELL BABRE~ OF O~ GRAVY OASO~E WATEE (~ iii ~. de~th; If shu~ down, No. Pao~o=v (~'tho~&) RECOVERED none, so state) ~te ~d ~ult of trot for oon~t of ~) , , ...... T~DI~G B~Y S~'ATE ~-4 Drilled 8 1/2" helle from 721~ ~o 10,609'. Ran electric logs Plugged from 7000'- 6800' with 2~6 cu. ft. cement. Tested · interval [rom 680~)'-6370'. Plugged from 6476-6200' with 2~0 cu.ft, cement. Set bridge plug ~ 3~0i)'. Well suspended 8-27-67. ........... 'NOTE.--There were ..................... "t3'.O.. ..................... runs or sales of oil; .................. .0. ............................ M cu. ft. of gas sold; ....... 0..O. ................... ' ............................. runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division o£ Mines & Minerals bY the 6thoi the succeeding moz~h,e.iJn~s~..o}l~er, wj2e~, directed. SE? 1967 DIVISION OF MINES & MINERALS 1967 Trading Bay State ~Yad~ug Bay F~eld Uui~n Oil Ccmpany of Calif., operator Union Oil C~pauy ~nchorage, Alaska 99503 · u~~ ts you= approved ¢~py of Suud~ l~utice iT-3) for the abow capt~ ~11. Ver~ ~ruly yours, Ka~l Lo Voude~-.~ae Petrol~ En~im~r Form P--3 e~'~';'E OF ALASKA SU]~MIT ZN ~ ~.ICAT]a* OIL AND GAS' CONSERVATION COMMISSION verse aide) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) Effective: July 1, 1964 §. LEASE DESIGNATION AND 8IERIAL NO. _ ADL 18731 6. IF INDIAN, ALLOTTEB2 OR TRIBE. NAME O,L [] GAS [] WELL WELL OTHER / 2. NAME OF OPERATOR 8. FARAf OR £EASE NAME · Union Oil Company of California Trading Bay Stage 8. ADDRESS OF OPERATOR 507 W. Northern Lights Blvd., Anchorage, Alaska 99503 LOCATION OF WELL (Report location clearly and in accordance with any State requirements.· See also space 17 below.) At surfece Trading Bay Monopod - 1611'N & 558'W of SE corner Sec. 4, T9N, R13W, SM 15. E~VA~ONS (Show whether DF, RT, OB, et43.) 101' RT Above MSL 14. PERMIT NO. 9. WELL NO.- 10. FIELD AN~) POOL~ OR WILDCAT · Tradin~ Bav Field 11. fJEC., T, B.,--~., OR'BLK. AND SURVEY OR ~AR~A Sec.4, TsN,= R!3W, SM 12. BOROUGH .., j 111..TATJ~ Kenai 'penin. Alaska 67-2 16. Check Appropriate Box TO Indicate Nature o[ Notice, Report, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF I I PULL OR 'ALTER CASING FRACTURE TREAT MULTIPLE. COMPLETE SHOOT OR ACIDIZE ABANDON· REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF': WATER SHUT-OFF ~-~ REPAIRING WELL '~'~-- FRACTURE TREAT.EST I--1 - ALTERXNG CASING SHOOTING OR ACZDZZZNG I I ABANDONMmNT* ' ] (Other) Suspended ,. . (No~n: Report results of multiple eomp~eti0n on Wen' - Completion or Reeompletion Report and Log form.) DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, ineluding estimated date of starting any proposed work. If well is direotionally drilled, Rive sulwurface locations and measured and true vertical depths for all markers and zones perti- nent to this work.) · . · 1- Plugged 7000'-6800' with 205 sacks Class "G" Cement in two stages. 2 - Tested from 6370-6800'. Recovered 51 bbls. 57# cu/ft, mud. 3 - Plugged from 6476'-6200' with 200 sacks Class "G" Cemeng. (Shoe of 9 5/8" casing at 6370') 4 - Set bridge plug at 3400'. 5 - Well Suspended 8-27-67. 18. I hereby certify, that the foregqing is t~b~e and correct TiTLEDist. Drlg. Superintendent DA~ August 28, 1967 (This space for Federal or State pfllee rise) APPROVED BY .~~ ~ CONDITIONS OF~APPROVAL, IF ANY: RECEIVED *See In~uclions on Rever=e Side AUG 2 9 1967 r DIVISION OF MINES & MINERAI~ ANCHORAGE .507 V~ry r. ruly ~, ~L-'V:J~ ~losmre 3 STA' OF ALASKA SUS~tIT IN TRI] '~ATE* (Other tnsttuettm, dn re- OIL AND GAS CONSERVATION COMMISSION verse aide) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) Effective: July 1, 1964 §. LEASE DESIGNATION AND ~ERIAL NO, ADL 18731 6. IF INDIAN; ALLOTTEE OR TRIBE. NAME 1, ?. UNIT..AGREEMENT NAME 2. NAME OF OPERATOR Union 0il Company of California 8. ADDRESS OF OPERATOR 507 W. Northern Lights Blvd.; Anchorage, Alaska 99503 LOCATION OF WELL (Report location clearly and in accordance with any State requirements.* See also space 17 below.) At surfoce Trading Bay Monopod - 1611'N & 558'W of SE corner Sec. 4, T9N, R13W, SM 14. PERMIT NO. 15. E~.~VA~0NS (Show whether OF,-BT, 67-2 101' RT Above MSL 16. 8. FARM:OR' LEASE NAME Trading BaY Stage 9. W~LL NO. ~ A-4 10. FIELD AND POOL; 0~ WILDCAT Trading-]BAY Field ~UBVEY OR' AB~A .. Sec. 4, TgN, R13W, SM 12. BO~U~H .~ '~ 18, s~A~m Kenai ,~enin' Alas~ Check Appropriate B°x TO Indicate .Nature oF Notice, Report, or Other Data NOTICE OF ZNTENT,O~ ~o: SUBSE,~E~'T TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE. COMPLETE ABANDON$ CHANGE PLANS Plug and ~Test .. SHOOTING OR ACIDIZING ~ ABANDONMENT* · (Other) - : " (NOTE: Report results of multiple eomp]etl0n on[Well Completion or Reeompletion Rep0rtand:Log form J) 17. DESCRIBE PROPOSED OR cOMpLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, ineluding e~timated date of.starting any proposed work. If well is directionally drilled, ~ive subsurface locations and measured and 'true vertical depths for~all markers Rna; zones perti- nent to this work.) * . Proposed: Plug from 7000' - 6800'. Test interval from 6800' - shoe-of ·9-5/8" casing at 6370'. Results of test will dictate future plans-. Pres~t Status: TD 10,605' 18. I hereby certify that the foregoing ts true a~ correct TITLE Dist. Drlg. Supt. August 23 1967 DATE ....... s .. . (This space for Federal or ~tate ofltee use) CONDITIONS OF APPROYAL, IF A~: TITLE *See Inductions on Reve.e Side DATE . . .. - .:.-;..?-.. -. _.:-: ..... STATE OF ALASKA Effective: July 1, 1964 LANP Au(J 9 1987 OIL AND GAS CONSERVATION COMMISSION ~.EASE NUM"ER LEA. E 01~ UNIT NAME .~°~O%ESSEE'S MONTHLY REPORT OF OPERATIONS Tt~e followir~ is a eorreot report of operatior~s and prod~etior~ (ir~el~dir~ drillir~ff and prod~eir~ wells) for the month, of ....... _J_.u_.l_y_ ........................... 19_6.7__ .............................................................................. ./f,~er~t's address 507 W. Northern Lights Blvd. Union 0il Company of California ................................................................... Corr~par~y ...................................................... ·, '~ ............................. .... ffJ.:. .... ..... PI, one ......... _2_7.7_m1__4__0__1__ ......................................................... .~l g er~ t' s title .P ~ s___t.:___Pr._.l__n_l~_'___.S_.Ur.t._: .................. AND Kor K TRADIN rwr. ]~ARREL8 OF OIL Cu. FT. OF GAS (In' thousands) Deepening Plusged m and 6335-~ squeezed Drilled ou Now drilli (}ALLONs OF (}ASOLINE I~ECOVERED d aqueez~ 000 with 390-6096 t shoe o: ng 8-1/2' BARRELS OF WA~ (If none, so state) ~d perfo~ 535 sac~ with 20( 9-5/8" hole at REMARKS (If dr~h~, depth; if shut down, oause; dat~ and result of teet for content of ations 5915-5125 :$ cement. Re- sacks cement. casing at 6370~. 7194~. NOTE.--There were ................... ..~...O... ...................... runs or sales of oil; ................ 0 .............................. M cu. ft. of gas sold; ........................ .n...O. ............................... runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 6th of the succeeding month, unless otherwise directed. 3ul]r 19, 1967 Union Oil Co. of ~ali£., lhton Oil Cosvany of California 507 ~~r~, Ala~ ~3 Dear ~osed is you~ fppL~ed e~p;y of_ Sund~ ~oct,ce (P-3) for cb above capt:f, om~ v~ll. ~v/cv Enclosure ga~l L. Vouder~e Form P--3 STAT ~F ALASKA SUB~IT IN TRIP] (Other Instructions OIL AND GAS CONSERVATION COMMISSION verse side) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for propose. Is to drll! otto deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) · Effective: July 1, 1964 ~. LEA~DE"ZO~A,ZON AND ADL 18731 -6. IF INDIAN, ALLOTTEE OR TRIBE~NAME 1. 7. UNIT-AGREEMENT NAME · . OiL ~ GAS WELL WELL OTHER 8. FARM OR LEA~E NAME Tradine :Bev 9. W~LL NO.-- · · 10. FIELD ANI~ FOOL, OR WILDCAT 2. NAME OF OPERATOR Union 0il Company of CalifOrnia 8, ADDRES~ OF OPERATOR 507 W. Northern Liehts Blvd.. Anchor~ee. AlaSka 99503 4. LOCATION O~ WELL (Report location clearly and in aCCo}dance with an~ Slate requirements.* See also space 17 below.) ' At surfoce · Trading Bay Monopod 1611' N, & 558' W. of SE comer Section 4, TgN, R 13W, SM 15. ELEVA~ONS (Show whether DF,-RT, OB, eto.) R. T.. 101' above MSL Sec. '14, ,,T~ 9N~, R 13W, SM enai 'pe, ninsua ~l-aSka 14. PERMIT NO. 67-2 16. Check Appropriate Box T° Indicate .Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: TEST WATna SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL PULL OR ALTERCASING MULTIPLE. COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT BEPOB~.~)F: . . FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (Other) NOTE: Report results of multiple ,eomp_letl0n on" Well ompletion or Recompletion Reporf~and Lo~ form.) 1~. DESCRIBE PROPOSED OR coMpLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, includinlr,_estimated dat~ of starting any proposed work. If well is dtreottonally drilled, ~lve subsurface locations and measured and true vertical depths fop 'all marke~s and zones perti- nent to this work.) * - Proposed: Drill to original T.D. 10,000' MD, 9890 VD. Approximately 2115' N. & 375" E. from SW comer Sec. 3, T 9N, R 13W Present Status: Plugged and squeezed perforations 5915-5125 and 6335-6000.'-' ~ith 535 sacks Cement. Re-squeezed 6096-6390' With 200 sacks cement. Proposed Procedure: Drill out bottom of 9 5/8" casing at 6370' and drill to- T.D., log and evaluate for completion. 18. I hereby certify ~hat the forefolng is true &d correct '-' n. D. H~han R E C'::E I.V E D ' JUL }8 t967' DIVISION OF MINES & MINERAL~- ANCHORAGE TITLE District Drilling Superinten~ 'July 17:1967 CONDITIONS OF TITLE *See InstrUctions on Reverse Side (REV 5/62) Trading Bay State ~FIELD) Kenai Peninsula {COUNTY) UNION OIL COMPANY C~ING RECORD DRILLING REPORT {TOOLS) SEC. 4 T. 9N R. 13W a.~M. {PERIOD ENDING) {NOTE INEFFECTIVE CASING) DEPTHS INC LINATION NO. DATE OURS ,,FROM i CORRECT- DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS ' , ! , , TO DEPTH· ANGLE . - NOTE MAKE 0 INSTRUMENT) RECOMPLETION SUMMARY · , { 13 3/8" '61# J55 T & C Buttress Casing @ 1077', 9 5/8" 43,5# N80 and 40# J55 and NS0 T & C Buttress casing @ 6370', Top of 43,5# NS0 @ 5216', Top of 40# N80 @ 4141', Top Joint is · 43.5# N80, '..; · Perforations '--3 7 65-L"-3-7'~'5'~ · . Squeezed -3710' -3 610~ · 3585'-35*5~ Perforations 6335'-6265 ' .. · 6215'-6160' · 1 6140'-6000' , Perforations 5945 '-5915 ' ' Not Affected 5875'-5820' by Completion 5765 '-7525' 5695'-5610' 5550'-5450' 5430'-5415' 5370'-5355' 5310'-5280' 5235'-5220' 5205'-5175' 5135 ' -5125 ' 22'x2" Scallop Gun. in hole 6367' to 6395' , . 6390' TD 6367 ' ED TUBING DETAIL 6345' Top of 186 its. 2 7/8" NS0 6.4# Seal Lok Tubing Fish landed @ 5831'. (Gun) O~is' X Sleeve @ 5421' Baker "F" Packer ·5011.92' 6342' Top of ~ CX Mandrel @ 4975' Junk CX Mandrel @ 3051' R E C E IV E D Plug) JUL 17 1967 DIVISION OF MINES & MINERAI~ ANCHORAGE . . i . I District Drillin~ Suoeri~~ ×/OHM 'I~} (REV A-4 WELL NO. Trading Bay State {FIELD) Kena± Peninsula (COUNTY) SEc.,, 4 T.. 9N R. 13W -- B. & M, UNION OIL COMPANY RECOMPLETION REPORT DRILLING REPORT (TOOLS) May 30, 1967 (PERIOD ENDING) CASING RECORD (NOTE INEFFECTIVE CASING) DE PTHS INC ElNA t ION ~O. DATE CORRECT' DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS 'O'UR$ FROM ' TO DEPTH ANGLE ' ' I ~OTE MAKE"~] INSTRUMENT May, L96~ 2 21 6390 6390 (rD) Moved rig and rigged up over State A-4. Finished rigging Up at 6:00 am. Rigged up Schlumberger and ran in with fishing tool to retrieve 1-3/8" tubing landed at 5947'. Unable to pick up mandrel on;top of 1-3/8" tubing string. '-" Rigged up wireline tools to shoot 1/4" hole in 2-7/8" tubing immediately above the 1-3/8" tubing. First attempt failed, but second attempt was successful. Rigged up to circulate with Halliburton pump. 2' 22 6390 6390 (rD) Pumped down long string up through short string for three hours. Circulated total of 375 bbls. 78# mud to kill well':.: Removed x-mas tree and installed check valves in donut of .. each tubing string. Installed spool, riser, and blow out preventors. Stabbed in and pulled short string, removed sleeve, and stabbed into mandrel. Unseated packers after a number of unsuccessful attempts. Pulled out of hole with single long string to dual, pulled dual string, · . dual packers and bottom single long string. Pulled and . laid down Did-log 1-3/8" tubing. Made up Baker packer · milling tool and ran same in hole. Began milling 'on packer at 5984'. 2 23 Milled packer slip retainer ring and retrieved packer. At approximately 5894' packer stopped. Approximately one hour required to work packer through tight spot. Pulled out of hole with milling ,tool and packer. Ran in hole · with HOWCO magnesium cement retainer and set same at 3850'. Pulled out, laid down setting tool, and ran in hole open ended to 3827'. Ran 50 cu. ft. water ahead of 275 sacks Class G neat cement mixed with 192 cu.ft. Inlet water. Displaced cement out of drill, pipe with 360 cu.ft, mud · '(700' theoretical fill, 3827' - 3127'). Pulled drill pipe to 2897' and back-scuttled pipe clean with mud. With pipe . '- rams closed, pumped 103 cu.ft, cement into formation. Gradually built pressure to 2400#. Pressure broke back to m ,. ~ 2200#. Shut down 15 minutes during which pressure de- l C~ I V'E O clined to 2000#. Pumped 16 cu.ft, cement and pressure in- creased to 2500#. Shut down 15 minutes and pressure de- ,IUL 17 967 creased to 2400#. Pumped 1 cu.ft, cement to formation and pressure increased to 2800#. After 15 minute shut down ~lVl$10~ O~ MINE & MtNE~ pressure was 2750#. Cement in place at 4:30 pm. Backed of~ '~!ANCHOR ~ pressure and pulled out of hole. Waited on cement 7-1/2 hr. Dist. Drlng. Supt. (REV 5/62) WELL NO. A-4 (FIELD) UNION OIL COMPANY' RECOMPLETION REPORT DRILLING REPORT CASING RECORD (COUNTY ) (TOOLS) SEC .~.T. R. B. & M. (PERIOD ENDING) (NOTE INEFFECTIVE CASING) DEPTHs INCLINATION NO; DATE DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS tOURS i CORREC¥' FROM I TO DEPTH ; ANGLE I" ,, , NOTE MAKE O INSTRUMENT) May, L967 ,, 2 24' Waited on oement 3 hours. Ran in hole with 8-1/2" bit and tagged 'top of cement at 3318'. Started drilling cement at 4:30 am. Drilled cement from 3318' to 3580'. , Drilled up magnesium bridge plug from 3580' to 3583'. Ran ,, . drilling assembly on to bottbm at 6345'· Pulled out of ", hole. Ran back in hole with casing scraper and bit to 6345'. Circulated mud out of hole with drill water and circulated hole clean. Spotted Inlet water mixed with . · Q-Broxin (12#/bbl.) across perforations from 6345' to · : 5900'. Pulled out of hole and made up M & T circulating washer. Started in hole with same· · 2~ 25 Washed perforations: 6345' - 6335' '6265' - 6215' 6135' - 6134'. Unable to wash the intervals: 6335' - . 6265' 6215' - 6135' and 6134' - 6000' Attempted to ., ' · break down these intervals with 1400#. Perforations ~. believed to be,non-existent. Spotted Inlet water mixed with Q-Broxin (12#/bbl.) across zone from 6345' to 5950'. Rigged up Schlumberger to re-perforate zone. 2 26 "' Schlumberger reperforated zones 6335' - 6265', 6215"- . 6160' and 6140' - 6000' with 4" Carrier guns, 4 shots .· per foot. Ran casing scraper to 6340'. Ran McGaffey- " Taylor washing tool and washed perforations from 6335' - 6000'. All perforations washed with 200. psi. 2 27 . Circulated hole clean,. Laid down'M & T washer. Ran Baker Retrievamatic~packer with Baker Model "F" stimulation valve on 2-7/8" tubing. Packer set at 5980', stimulation valve at 5972', Otis sliding sleeves at 5934' and 2532' '. Opened stimulation valve - weak blow at surface and dead . in three minutes. Attempted to open valve again. This time had. good blow to surface (25 psi shut in). Opened . well to test trap .(trap vented to atmosphere). Surface pressure decreased to 2 psi and remained constant. Gas to surface in 2.5 hours. Valve open 9.5 hours, no fluid to surface. Jt'ECEIVE) JUL 1' ,1967 DIVI;lION oF MINES & MI~ ERAL~ /~ Dist. Drln~..Suot. ' ~ · / FORM 1D~ {~EV~/§2) WELL NO. A-4 ~FIELO) UNION OIL COMPANY RECOMPLETION REPORT DRILLING REPORT CA~I NG RECORD (COUNTY) (TOOLS) SEC. T. R. (PERIOD ENDING) (NOTE INEFFECTIVE CASING) ;,, , DE PTHS IN C LIN A T ION NO. DATE I'CORRECT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS TOURS , FROM ,, T° DEPTH' ANGLE_. NOTE MAKE O INSTRUMENT) May, 196,7 2 28 ~ Blow remained steady for 15 hours. No fluid to surface. Ran wireltne with 1-7/8" blanking plug to 5974'. De- termined Baker stimulation valve was open, but found no . , fluid in hole.. Mixed 100 gallons "Skor-Free" in 200 cu.ft. diesel. Pumped 140 cu.ft, dow~ tubing when pressure was encountered indicating tubing fluid level at 4215'. · Formation began taking fluid at 2200 psi. Pumped additional 50 cu.ft, and.pressure increased to 3000 psi. Shut down and pressured annulus from 500 to 1000 psi. " "B" zone began slowly taking fluid. Began pumpingdown tubing - formation slowly taking fluid at 3400 psi (2vt/2 to 3 cu.ft, per minute). Pumped total of 215 cu.ft. ' . down tubing since start. Shut down and pressure bled · 2000 psi in ten minutes and remained at 2000 psi for additional ten minutes. Pumped additional 33 cu.ft, in tubing.at 2800 psi with annulus pressure rapidly increasing · to 1750 psi while tubing pressure decreased to 2000 psi. Shut down ten minutes - TP 2000 psi CP 1000 psi · Shut down .45 minutes - TP 1400 psi CP 800 psi Shut down 1 hour - TP 1400 psi CP 800 ps!3 Bled tubing back. to 0 psi and casing dropped to 700 psi .' ~hen slowly decreased to 490 psi. Began back-scuttling diesel from tubing. 2 29 Completed back-scuttling diesel and continued pumping for six hours. Working gas out of fluid to kill well. Pulled · out of hole and laid down packer. Rigged up to hydro, test tubing into hole. Ran 186 joints 2-7/8" 6.4# N-80 >' Seal-Lek tubing with Baker Model "F" packer. Set packer at 5011.92"RT., 811' of tail pipe below packer with trip sub located at 5831' and Otis X-sleeve at 5421'.' CX mandrels set in string at 4975' and 3051'. Ball valve located at 327'. All tubing hydro-tested and made up with power tongs. Removed blow out preventers and rise and installed xumas tree, tested to 3000 psi. Released rig from A-4 at' 9:00 am for move back to A-$. 1 30 R E C ElY f: D Displaced Inlet water in tubing and below packer with 550 cu.ft, of diesel. Dropped ball and set packer with JUL 17 1967 2soo psi. Job c (rePlete at 3:15 am. ANCHO~G~ Dist. Drlng. Supt. ~ Oil Co. ef CilLEo, Ope=er. er Em:losed t-s your .qspz'o~ed ~ of Sund~ Bo~ (E~2) for ~ c~:~~ wIX. ~y ~r~zly ye~s, Form P--3 STA~'~F ALASKA SUZMIT IN TRIP ,Tz~* · (Other lnst~mctionb .n re- OIL AND GAS CONSERVA~ON COMMISSION verse ~de) .. SUNDRY NOTICES AND REPORTS ON WELLS (Do 'not use this form for proposals to drill or to deepen or plug back to a different reservoir. Use "APPLICATION FOR PERMIT--" for such proposals.) WELL WELL OTHER NAME OF OPERATOR Umion OiI C~Pany of California 8. ADDRESS OF OPERATOR 507 W. NOrthern Lights Blvd., Anchorage, Alaska 99503 4. LOCATION OF WELL (Report location clearly and in ~'ccordanee with any State requirements.* See also space 17 below.) E£fective: July 1, 1964 APL 18731 6. IF INDIAN, ALLOTTEE OR TRZB~ NAME UNIT AGREEMENT NAME 8. FARM' OR LEASE NAME Tra~u~ Bay~ State 9. w~r;~ NO. _ 10. FIELD AND_.POOL, OR WILDCAT At surfece - Tradin~ Bay HonoPod 1611' N 7. 558' W of SE corner Section 4, T 9N, R 13W, SH J 15. ELEVAtIONs (ShO~ w]~ether DF, .BT, es, .eta,) 67-2 aT lO1' 14. PERMIT NO. 11. SEC, ~., Ri, M., 6R ~LX. AND S~RYBT OR'~A .. Sec. 12. BOROUGH 16. Check Appropriate Box T° Indicate .Nature o~ Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPOB~ OF ~ TEST WATER SHUT-OF~ FRACTURE TREAT SHOOT OR ACIDmE REPAIR WELL (Other) PULL OR'ALTER CASING MULTIPLE. coMPLETE ABANDONS ' CHANGE PLANS WATER SHUT'OFF . REPAIRING ~WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other)' f' ~ .~'  NOTE: Report results of multiple:e~mPleti0n~' on Well ompletion or Recompletion Re~ort. !.n,~[ Log form.) DESCRIBE PROPOSED OR coMPLETED OPERATIONS (Clearly state all pertinent details, and give Pertinent dates, including, estimated dste o! starting any proposed work. If well is direotiOnally drilled, ~ive subsurface locations and measured and true vertical depths fo~ all markers and zones perti- nent to this work.) $ W~LL S~Y 13 3/8 cemented 1077' 9 5/8 cemented 6370' Perforated and squeezed 3545-3585, Perforated 5125-5945 @ intervals Perforated 6000-6335 3610-3710, 3745-3765 It is proposed to plug and squeeze the Hemlock Zone. The well will be suspended. A re-drill will be proposed at a l&ter date. 18. I hereby cer.tify tha~ the foreso~ng i]~ true and correct ~TLEDistrict Drillins Superintend.-July 12, 1967 *See Instructions on Reverse Side RE'CEIVED JUL DIVISION Of MINES & MINERA~ ANCHORAGE Form No. P 4 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Effective: July 1, 1964 LAND nFFIE:E LEA=~E NUMBER LEABE IS3R UNIT NAME ELESSE S MONTHLY REPORT OF OPERATIONS The ]'ollo~Jir~ is a oorreot; repor~ o/' ope~atior~s and. pro~e~v, (i~o[~e~i~,~ drilli~ and prod~ei~ wells) for t~e month of ...... :~ ............................. 19._~_~_ ............................................................................. J~e~t's address _~PT___~,___~b~r~__~gb~__~.4_, .......... Com-a~' Union 0il Co. of C~lif. ~o~ ...... ~:$SP$ ........... ~ ................................................. aie.~' ~ t~tz~ P_~_;_;.;.~__~~_~_~4~% ......... BEC. AND ~or ~ TRADII WEL kTE D -4 BABBEL~ OF OIL Cu. FT. OF GAS (In'thousands) .te-rentere, :ubing and 3825' - 35 )ressure 2 )erforated !oot from i~40' - 60 ,it.h McCaf~ )ST. Set Ln 2-1/2 h L5 hours. ~ith packel ?erforatiot ~t interval (}ALLONS OF (}ASOLINE RECOVERED well M~ packers ,5' with I00~. Dz with ion '335' - ~ ~0'. Wa~ 'ey-Taylo ,acker at ,uts. Ha No. fluid at 5012 s now op .s. To b BARRELS OF WATEa (If none, so state) y 22, 19 Squeez 275 sack 'lied ou 1/2" Jl 265', 62 hed peril r perfori 5980' · d weak Sl entry. ~ and tn: en from · tested REMARKS (If chilling, depth; if shut down, oaua~; date and result of test for Sasollne oontent of gM) i7. Pulled ~d perforations cement. Final cement. Re- t holes per LS' - 6160', and )rations freely trion washer. Gas to surface :eady blow for Ran 2-7/8" tubing L1 to 5831'. i360' - 5040' further. NOTE.--There were ................... ..~..0. ....................... runs or sales of oil' . ....... n.o. ................. M cu. ft. of gas sold; runs or sales of gasoline during the month. (Write "no" where applicable.) ............................................................ of the status of operations, and must NOTE.--Report on this form is required for each calendar month, regardless Mines & Minerals by the 6th of the succeeding mo[([h~[~u~les~ c[hvw~e[~ be filed in duplicate with the Division of directed. JUN 61~? DIVISION / flrORM Illl ~REV 8/e2) WEI. I. NO, State A-4 (COUNTY) ' R. B.&M. UNION OIL COMPANY DRILLING REPORT (TOOLS) CASING RECORD 13-3/8" surface pipe set at 1077' 25 Joints plus 1 10' finned Joint (t~p). 13-3/8" 61# J55 casing centralizers at 1072',1032',987' 944', 900' - Baker float shoe at 1077'. Baker float collar at 1033'. (PERIOD ENDING) {NOTE INEFFECTIVE CASING) , i j i i i DEPTHS IHt LINATION . NO, DATE ' ' CORRECT' DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS )UR$ FROM TO DEPTH ANGLE , ,, NOTE MAKE OI INSTRUMEN1 March Directional Ho:,e Below 6~9' 1 23 0 0 Moved rig from State A-3 to State A-4. 2 24 0 699 603 0 Spudded at 7:00 am. Finished rigging up. Drilled 12-1/4" hole from 0' .to 699'. 2 25 1090 11015, Dyna-drilled and surveyed 12-1/4" hole from 699' to 1111'. Ran IES log from O' to 1111'. Made up 17-1/2" hole opener and ran in hole with same; 2 26 1111 Opened 12-1/4" hole to 17-1/2" to 1090'. Pulled out and made wiper run back to bottom and circulated. Pulled out and laid down hole opener. Rigged up and ran 25 Joints plus one 10' finned Joint of 13-3/8" 61# J55 casing, landed at 1077'. Finned Joint on top with fins 2' below production deck level. Cemented casing with 1220 sacks class G neat cement. Ran 100 cu.ft, water ahead of slurry. Displaced slurry with 890 cu.ft, mud and 70 cu.ft, water. Good cement returns to surface. Bumped plug with 1500#. Cement in place at 7:45 pm. Wait on cement. 2 27~ 1111 Wait on cement. Cut off 13-3/8" casing at 12:00 noon Installed Shaffer 12" 3000#.K.D. casing head and welded same. Tested for 20 minutes, ok. Nippled up and tested blow out preventors to 1000# for 15 minutes, ok at ll:00pm ./ istarted drilling out float collar. 2 28 1111 1462 Cleaned out cement to 1111'. Drilled and surveyed to 1371'. Well began flowing. Bled well down, conditioned .' mud. Ran back in hole with Dynadril to continue drilling 12-1/4" hole. Dynadrilled and surveyed 12-1/4" hole to 1462. Mud:-wt.81# 2 29 1462 2197 Drilled and surveyed 12-1/4" hole from 1462' to 2197'. Dynadrilled 12-1/4" hole from 2120' to 2197' 2 30 2197 2780 Drilled 12-1/4" hole from 2197' to 2344'. Cored from 2344' to 2368' - cut 24' recovered 24' of oil saturated oil sand. Free oil on core. Coring rate - 1 ft/min. 'R C ElY E O co ..and ..rye,ed 12-1/4" hole fro. 2368' to 2780;. Mud'. w~.82.5, vis. 57, w.1. 2, f.c. 2/32, ph 9 II .:.~,V ~,m, ... '' chlorides, 7500i I ppm. , DI¥1$10N 01: MINES & MtNEIU~.I,~ I---J ANCHOI~GE . - ....... i State A-4 UNION OIL. COMPANY DRILLING REPORT CA~ING RECORD 13-3/8" set at 1077' {COUNTY ) {TOOLS ) SEC. . T. R. B.&M. ~ {PERIOD rNDIN6) {NOT[ INrlrFrCTIVr CASING) : . j N.O. DATE , , DE~THS INCLINATION OURS CORRECT DETAILS oF OPERATIONS, DESCRIPTIONS AND RESULTS FROM TO DEPTH ANGLE ,, , , NOT, MA,, OI INSTRUMENT) March (cont' d)_ . 2 31 2780 3104 Drilled 12-1/4" hole to 2782'. Ran Dynadrtl and drilled to 2882' turning hole from N83°E to N65°E. Ran bit #7 with locked-in drilling assembly and drilled 12-1/4" hole to 3104'. Mud: wt.82.5, vis. 57, w.1. 2, f.c. 2/32, ph 9, chlorides 7500 ppm April 2 1 3104 3377 Cored from 3104' to 3129". Cut 25', recovered 25', core #2 3104' to 3110' - oil sand - oil saturated. Good petroleum odor. Free oil on core. . 3111' - 3129' = conglomerate - oil saturated. Good petroleum odor. Free oil on core. Ran bit #8 reamed core hole and drilled to 3339'. Ran bit #9 and drilled 12-1/4" hole to 3377'. Mud: wt. 82.5, vis. 57, w.1. 2, f.c. 2/32, ph 9, chlorides 7500 ppm. 2 2 3377 3814 Drilled and surveyed 12-1/4" hole to 3515'. Pulled out of ~' hole, picked up Shaffer shock sub and changed drilling assembly. Ran bit #10, drilled and Surveyed 12-1/4" hole to 3710'. Mud highly gas cut through this section necessitating the increasing the mud weight from 80# to 84#. Continued drilling 12-1/4" hole to 3814 with bit #11. Mud: wt. 84, vis. 48, w.1. 5, f.c. 2/32, ph 9, Chlorides 6700 ppm. 2 3 3814 4190 Continued drilling. 12-1/4" hole to 4190'. Lost 50 bbls. of mud from 4080' to 4084'. Mud: wt. 85, vis. 48, f.c. 2/32, ph 9, chlorides 6800 ppm, w.1. 4.8. 2. 4 4190 4450 Continued drilling 12-1/4" hole to 4450' with trips at 4312' and 4450' for new bits.' Lost 2 hours repairing salt-water cooling system. Mud: .wt. 85, vis. 48, w.1. 4.8, f.c. 2/32, ph 9, chlorides 6800 ppm. 2 5 4450 4710 Drilled 12-1/4" hole from 4450' to 4710' with bit #15 and 16. Ran light weight on bit #16 in an attempt to drop angle of hole. Mud: wt. 85, vis. 48, w.1..4.8, f.c. 2/32, ph 9, chlorides 6800 ppm. REC ElY E'O -, .... i':~ ~ ,1 ~ 'qn'I ,, I DIVISION OF MINES & MtNI~RAL~ ANCHO~GE ' 01¥1510N ENGINEER .. FORM tBS (REV U/S2) WELL NO. State A-4 UNION OIL COMPANY DRILLING REPORT CASING RECORD 13-3/8" 61# J-55 at 1077' (COUNTY) (TOOLS (PERIOD ENDING) JNOTK INKFFIrcTIVK CASINS) ' ' I i I i ' ' I ' [ ' i ' ' i ] Il Ill I Ill [ Il i I Il I Il llll I DEPTHS INCLINATION NO. OATE DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS roulqs i colqlqEc~ ~OTK MAKE O INSTRUMENT ) ApF~ (cont'~i). 2 · 6 4710 5002 Drilled 12-1/4" hole from 4710' to 4911' with bit #17. Drilled 12-1/4" hole from 4911' to 5002' with bit #18 running light weight to drop angle. 2 7 5002 5247 Continued drilling 12-1/4" hole from 5002'to 5247' with bits #19 and 20. 2 8 5247 5495 Continued drilling 12-1/4" hole from 5247' to 5495' .Iwith bits #21 and 22. 2 9 5495 5692 Continued drilling 12-1/4" hole from 5495'"to 5692' with bit changes at 5504' and 5606'. 2. 10 5692 5896 Continued drilling 12-1/4" hole from 5692' to 5896' with bit changes at 5781' and 5873'. 2 11 5896 6094 Continued drilling 12-1/4" hole from 5896' to 6094' with bit change at 6032'. 2 12 6094 6257 Continued drilling 12-1/4" hole from 5896' to 6094' with bit change at 6182'. 2 13 6257 6346 Continued drilling 12-1/4" hole from 6257' to 6346' ~with bit change at 6294'. Rigged up Schlumberger and commenced logging. 2 14 6346 6356 Continued logging well. Ran 1ES, Gamma Ray Neutron, Gamma Density and C.D.M. Ran bit #33 and continued drilling 12-1/4" hole to 6356'. 2 15 6356 6390 Continued drilling 12-1/4" hole from 6356' to 6390'. Rigged up Schlumberger and ran IES log from 6400' to 5700'. Ran bit #R.R. #33, conditioned hole fo; casing. Rigged up and commenced running casing. 2 16 6390 T.D. (d:iller) Ran a total of 154 Joints, '9-5/8" 43.5# 40# N-80 and '~ 6400 T.D. (S:hl~mbexger) J-55 casing. Shoe set at 6370'. Ran "top" cement plug on float shoe to prevent cementing the section from 6390' to 5954'. Cut four 3/~." holes 4' .~bove Pin .o~ Joint #11 · ~t 5954'. Float collar set at 5915'. Top of 43.5# N-80 E I VE ~et ~t'"5216,..~op o£ 40# N-80 set at 4Z4['.D',~'iiCO:~,~. set at'3932'. Top Joint is also 43.5# - ran on top.of lilaY ] ~ tgi? -' : cont'd ....... --- ii i iiii ii i i i iii i i i i DIVISION OF MINES & MINEI~i.~ ANCt.IO~ '- DIVISION ENGINEER W~lL NO. State A-4 ~FIELD ! (CouNTY) R. B.& M. UNION OIL. COMPANY CASING RECORD DRILLING REPORT ' ' ' ..... (TOOLS) (PERIOD ENDING) (NOTE INEFFECTIVE CASING) DE PTHS INC LIN A T ION NO.. DATE ' I I CORREC~ DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS 'OURS FROM TO DEPTH ANGLE , NOT[ MAR[ 'Oi INSTRUMEH1 ) 16 cont'd 40# J-55 casing. Centralizers at 5955' 5930' eec ~ 5910' 5690' 5560' 5400' 5230' 5120' 4990' 4300' 3985' 3940' 3930' 3810' 3480' 3440' 3390' 3150' and 1050'. Casing made up with 5700# torque using power tongs. Baker-Lok applied to shoe, float collar, D.V. collar, and two connections above each. Cement Job #1: cemented through holes in casing at 5954' with 500 sacks class "G" cement mixed with sea water to 114# slurry. C~ment preceeded with 100 cu.ft. of heavy gel pill and 100 cu.ft, of water. Cement in place at 8:30 am. Waited 4 hours then ppened ports on D.V. collar. Cement Job #2: cemented through D.V. collar at 3932' with 375 sacks class "G" cement mixed with sea water to 114# slurry. Cement in same::manner as Job #1. Closed ports on D.V. collar. Cement in place at 2:45 pm. Set casing slips and landed casing with 160,000# tension. Cut off 9-5/8" casing. Installed tubing head and tested same with 3000 psi - 10 minutes. Nippled up blow out equipment and riser. Tested blind rams with 1500 psi - 10 minutes. 2 17 6390 TD Ran bit #34 and Baker casing scraper. Drilled out D.V. collar at 3932'. Tested pipe rams with 1500 psi - 10 mins. Ran bit to top of float collar at 5915'. Tested Hydril with 1500 psi - 10 minutes. Drilled out float collar and cement down to 5956' (2' below holes). Ran bit to top of plug on shoe at 6367'. Circulated hole clean. Closed pipe rams and pressured 9-5/8" casing to ~00 psi. Cemented between 9-5/8" casinK and 13-3/8" casinz by ~,,moin= throumh valve on lower casin= head. Cemented . ~ith'300 sacks class "G" cement mixed with sea Water and 2-1/2% calcium chloride. Cement in place at 11:15 am. Displaced mud in hole with drill water and commenced mixing sodium chloride and calcium chloride. 2 18 TD Continued mixing sodium chloride and calcium chloride. Pulled out of hole. Schlumberger. ran C.B.L. and coorelation log. COmmenced picking up 2-7/8" tubing calcium chloride. Ran tubing to top of shoe. · ANCHOP, AC~ DIVISION ENGINEER ORM IB~ (REV WELl.. NO, State A-4 UNION OIL COMPANY CA~IN(J RECORD DRILLING REPORT ~F I[ L.D I (COUNTY) (TOoL~s) SEC° .T. R. B.&M. (PERIOD ENDIN6) {NOTE INEFFECTIVE: CASINe) DE PTH$ INC LINA T ION NO. DATE ' I .~ORRECT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS 'OURS FROM TO DEPTH ANGLE I , II ~OT= MAKE ~1 INSTRUM[NT) April (c.onc '~L)_ 2 19 TD Weighted completion fluid to 85# per cubic foot. Pulled tubing out of hole. Perforated as follows: 6360' - 6160' 4/ft. 1-9/16" Scallop guns. 6140~ - 6052' 4/ft. 2" Scallop guns. Lost 22' 2" O.D. gun in hole on run #13 (6074' - 6052'). 2 20 TD Perforated as follows: ' 6052' - 6000' 4/ft. 2" Scallop guns. " ' 5945' - 5915' 4~ft. 4" Carrier guns. 5875' - 5820' 4/ft. 4" Carrier guns. 5765' - 5725' 4/ft. 4" Carrier guns. · 5695' - 5610' 4/ft. 4" Carrier guns. 5550' - 5510' 4/ft. 4" Carrier guns. 5510' - 5450' 2/ft. 4" Carrier guns. 2 21 TD Perforated as follows: 5430' - 5415' 2/ft. 4" Carrier guns. 5370' - 5355' 2/ft. 4" Carrier guns. 5310' , 5280' 2/ft. 4" Carrier guns. 5235' - 5220' 2/ft. 4" Carrier guns. 5205' - 5175' 2/ft~ 4" Carrier guns. 5135' - 5125' 4/ft. 2" Scallop guns. · 3825' - 3765' 4/ft. 2" Scallop guns. 5085' - 5040' 2/ft. 4" Carrier guns. 3765' - 3745' 4/ft. 2" Scallop guns. 3710' - 3610' 4/ft. 2" Scallop guns. 3585' - 3545' 4/ft. 2" Scallop guns. Rigged down Schlumberger, rigged up and ran tubing. · , ECEIVEO ,1967 DIVISION OF MtNE$ & MINEiJA~ .... ~!..' "'" ~ DIVISION ENGINEER ?IeORM 165~(R~¥ 6/62) · WELL NO, NO. FOURS 2 State A-4 ~lrllr t.D ) (COUNTY) I~.& M. FROM TO (COI/t * ( TI) iNCLINATION DEPTH ,NOTE MAKE OI TD ., UNION OIL. COMPANY DRILLING REPORT' (TOOLs) CASING RECORD 7"40#, 43.5# J-55, N-80 landed at 6370' CP 5954' DV 3932' Jet Perfs 6052' 3545' and at int.. (NOTE INEFFECTIVE CA~ING) ANGLI~ (PERIOD ENDING) DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS Ran dual tubing string. Hydro tested and measured same. Landed tubing. Long String as follows: Otis Model "N" Nogo and shear sub at 6049'; Baker Model "S" packer at 5984'; Otis Model "X" sleeve at 5947'; Baker Model "A5" packer at 3852'; Otis Model "X" sleeve at 3537'; Baker Model "A5" packer at 3490'; Otis CX gas lift at.3448' ' and 2151'; Otis ball valve at 274'. Short string as follows: Otis Model "N" Nogo and shear sub at 3859'; Otis Model "X" sleeve at 3813'.and 3534'; Otis "CX" gas lift at 3452' and 2222'; Otis ball valve at 264'. .. Installed production lines, nippled up xmas tree. Set sleeves with wire line service equipment. Moved rig to State A-3 at 3:00 pm. Moved rig from State A-3 back to State A-4. Nippled up blow out preventors. Tested same. Equalized pressure between' tubing and casing annulus. Pulled short string out of Baker "Stab in" packer. Reseated short string. Set plug below packer on wire line. Set packer with pump pressure (2000#). Tried to retrieve plug from 2-1/2" tubing with wire line service tools. Fished tubing plug (Type "N", Otis) with rig sand line. Relanded short tubing string. Set top packer. Pressure tested annulus above packer with 1500~ for 5 minutes, ok. Hooked up Otis ball valve lines. Installed xmas tree. Nippled down blow out preventors. Prepared to move rig. Moved rig as far as possible toward State A-5 without interferring with piano wire lubricator. Production Dept. finished with wire line work at 3:00 am. Released rig' at 3:00 am. RECEIVFO DIVIIlION ENGINEER ~ 18~ (REV 8/6~) ' / UNION OIL COMPANY CASING RECORD WELL. NO. State A-4 Trading Bay ElF I Ir LD I DRILLING REPORT Kenai Peninsula (COUNTY) (TOOLS) · sec. 4 T. 9N n. 13W ,.~M. April 26, 1967 (pIrR I OD ENDING) {NOT[ INEFFECTIVE CASING) DE~THS IHC ElNA TION NO. DATE CORRECT DETAILS OF OPERATIONS, DESCRIPTIONS AND RESULTS OURS FR OM TO DEPTH ANGLE , , , , ......... ~OTI: MAKE OI ~NSTNUM~NT) .... CON. TRA! :TOR Caldrill Alaska, Inc. EQUIPMENT Oilwell 860 Draw Works - Electric Power . 2 - N 1100 National Pumps - Electric Power Standard ·Derrick LOCATI~}N Conductor t/23 - 1611' N and 558' W of SE Corner · , Sec. 4, T9N, R13W .. ELEVAT£ON.S Water Depth 62" MLLW R. T. to Ocean Floor 174' R. T. to MLLW 112' R. T. to Drill Deck 22~07' R. T. to Production Deck 40.82' · MEASUR ~2tENTS All Measurements from Rotary Table · · '. . RECEIVED , t:;A¥ 1 ? '"' DIVISION OF MINES & MINERAL8 ANCHORAGE I II I I ii iii 1 iii I I I i ii i i ~, I 1967 GnJon O:L1 C:m~a~r of C81Lfornf~ 5O7 V. Hort:he~ ~ Blvd. Oil Co. o£ C81if., geGr Sir: hcbod fJ ~ q,proved cop7 of budr7 ~ (Lo2) the nbo~ cspttomd mil. Km:l L. Veuderb Petroleum Enslneer ELV/c~ Form No. STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Effective: July 1, 1964 LAND r'IF'FIOE LEABE NUMBER LEASE OR UNIT NAME LESSEE'S MONTHLY REPORT OF OPERATIONS Tl~e f°llowir~ is a correo~ repor~ of operations arid prod~ctior~ (ir~eh~di~ drilli~ a~d prod~ci~ wells) for tke mo~th of ___=_.~.~.~. .......................... 19..~.~_, .................................... : ....................................... ~e~t's address .~_~___~:.._~9~~__~~--~-~ .......... Company Union 0i~___gD~_~.o~_..9~_..~.a~%f.ox~a . ....... -g~o~e ................ ~]]:~-~- .............................' ..................... J~e~t' s ~i~le ____P~_~.L,_..~.~g,.--~-~., ............... SEc. AND Tw~. BARRELS OF On'. Or. FT. OF (}AS (In' thousands) Continued 6390'. R~ 43.5# J-5. through C and throu cement. 9-5/8" cat 5945' - 5 5695' - 5( tubing stI and 3490 ' (}ALLONS OF GAsoLn~E RECOVERED drilling Ln electr & N-80 P. at 59 h DV col leaned o lng 6360 15', 587 40', and ings wit Now te BARRELS OF W*.~EE (If none, so state) 12-1/4" ic logs. casing t, 54' with tar at 3! xt to 631 - 6160 ' - 582( 3825' - packer~ ting. REMARKS (If drlllln$, dopth: If shut down, oau~; date and result o! te~t for Saeoline oontont of directional hole to Ran 9-5/8" 40#, 6370'. Cemented 500 sacks cement 132' with 375 sacks '0'. Jet perforated , 6140' - 6000', t' 5765' - 5725' 3545'. Ran dual at 5984', 3852', NoTE.--There were ......... ..n..o.. ................................. runs or sales of oil; ................................................ M cu. ft. of gas sold; runs or sales of gasoline during the month. (Write "no" where applicable.) ........ ~'~/'"~;;~";~"~'~"~';'~n is required for each calendar month, regardless of the status of[~,p~[a~, r~ n t be filed in duplicate with the Division of Mines & Minerals by the 6th of the succeeding mom~n,~,umes~ ~{~n~e['~ directed. [,']A¥ 1 0 1967 DIYh,',',SION ,,2r MINES & MINERAJ~ AI,IQ-t0P, AGE Form P--3 STAT! F ALASKA SUBMIT IN TRIP1' (Other instructions re- OIL AND GAS CONSERVA~ON COMMISSIONverse side) SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepe- or plug back to a different reservoir, Use "APPLICATION FOR PERMIT--" for such proposals.) OIL ~ GAS [~ WELL WELL OTHER 2. NAME OF OPERATOR UNION 0IL COMPANY OF CALIF01~NIA ADDREBS OF OPERATOR 50? W. Northern Lights Blvd.; Anchorage, Alaska 4. LOCATION OF WELL (Report location clearly, and in accordance with any State requirements.* See also space 17 below.) At surfece Trading Bay Monopod, 1611' N and 558' W of SE corner Sec. 4, T9N, R13W, SM 14. PERMIT NO. 67-2 15. E~.~.VA~ZONS (Show whether Dr,-BT, OB, et~) RT 101' abOve eSL Effective: July 1, 1964 5. LEA~"DESIGNATION AND SERIAL NO, ADL 18731 6. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT AGREEMENT NAME 8. FARM OR LEASE NAME Trading Bay. State 9. W~LL NO. A~4 10, FIELD &ND POOL~ OR WILDCAT Trading Bay Hemlock 11. SEC. T. ~., M., OR BLE. AND SURYE'~ OB ABRA Sec. 4, TGN,.R13W,'.SM 12. BOROUGH' Ken~i Penin, [ Alaska 16. Check Appropriate Box TO Indicate Nature o~ Notice, Repo~, or Other Data NOTZCE OF ZNTENTZON TO: SURSE(~ENT aEpoa~ TEST WATER SHUT-OFF I t PULL OR ALTER CASING FRACTURE TREAT MULTIPLE. COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) WATER SHUT-OFF FRACTURE TREATMENT SHOOTING OR ACIDIZING (Other) REPAIRING WELL ALTERING CASING ABANDONMENTS N OTE: Report results of multiple-eompletl0n on Well ompletion or Reeompletion RepOrt and Log form.) , DESCRIBE PROPOSED OR cOMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well la dlreettonally drilled, ~lve subm=face locations and measured and true vertical depths for-all markers and Zones. perti- nent to this work.) * 1. Perforate 3545' - 3825'. 5040' - 5695' 5725' - 5765' 5820' - 5875' 5915' - 5945' ) 2 · Perforate , , , · 3. Perforate 6000' - 6140', 6160' - 6360'. 4. Run dual tubing strings with packers at 3490', 3852' and 5984'. Sleeves will be run so that all zones open can be tested individually or together. 5. Original hole was programmed for 9050' T.D. 6. Hole is now bottomed at 6390' T.M.D. 6208' V.D., 366' N and 687' E of surface location. 7. Surface location - 1611' N and 558' W of SE corner Sec. 4, T9N, R13W, SM. 18. I hereby cert2y~that the foregoin~ is tr and correct SIGNED '~' ~ TITLE ~. o. McMahan Dist. Drlng. Supt. DATE May 3, 1967 TchiS approval w~ll be subject to onservation Order #42. *See I.~uctions on Reverse Side RECI:IVED 1967 DIVI~IOIXl OF MINES & MINERAL~ ANCHORAGE FROM "t~=~_O= Oil' Co. of C~lifo-~n~-a TRANSMITTING THE FOLLOWING: ., -' UNI°N TRADING BAY STATE A-4: , 1 ~ Induction Electrical Log, 2" Runs 1-3 Blue line . 1 " " " " " 1-3 Sepi~ , · t M~d LlOg 1100-6390', Blue line 1 " " " " SepAa ,1 ~ core description, Coz'es i and 2 / 1 A15c-1 ,Directional Drilling S~vey , , , 5 ,~ '"- + ,,,.'¢~,.z, u ~, ~w 7' OCr FI i% L -,.. , , . 'i' '*' '"[::" "-!.::' D?~TE J .o. jsizE.~ "v,/P~-j Fao~',,., SAI'~D U^~,ReL i .p,y S. HA E SAND j SHELL. D£SCEIPTION OF CORE ? REC IVEI) ' I,IAY ,., ~. 1961 .. _~'/E L L .EI.EVATION ANGL APP'T OF' DIP HOL, I ~'"' _t · DESCRIPTION OF CORE. ~:'~ 5'~,',-'L D-~ b,--~, -~."~-~'y' ' ,. . ., . . . . ~.~./~ ,,. ~ ~ (:~ ~j ~ ,,~ ~..:, . '. . . b,.-,-~ ~ ~ 'F "~.- ''~ ":2: ~') ., . ..- .. :El. F, VA"I'I C,b~ Form No. P~4 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE Effective: July 1, 1964 LAND LEABE NUMBEI~ LEASE OR UNIT NAME LESSEE'S MONTHLY REPORT OF OPERATIONS State ......... A!_a._~_ka .................... Borough _Kemai__P__eniusula ....... Field ...... Wildcat ...................................................... Tl~e following is a correot report of operations and prod~ction (inel~din~ drillin~ and prod~ei~ wells) for tI~e month of ..... __Y[__a__r__c__h_ ...... ~ .................... 19__~_, ............................................................................ vlge~t's address .... 5_O2__~_.__l~or_ther~x~Light~__Bl~.d ....... Company __U_~iQu__Q .il._~o .mpa~y_~f._California ............................... _A__n__c_ho__r___a_g_e__..__AJ.~ka__995.0_3 ................ Signed ..... J,/._':_ -4~---'---t~----b---~ .......... Ph, or~e .................... 27_7__--_1_401 ............................................... .4gen, t' s title ____D_~.s_~_:__.D..r__l..n_g,.__S_Up.t;, ................ ~EC. AND Ho~ ~ TRADI [G BA] STATE {A-4 BARRELS OF Cu. FT. oF GAS (In thousands) Spudded direct2 · ~Ot4fcas 1077'~ cement direct2 OALLONS OF (~ASOLINE RECOVERED March 2 onal hol. £ng ceme: ith 1220 returns. unal hol, BARRELS OF WATER (If none, so state) , 1967. to ted in sacks c o surfa~ to 278, REMARKS (If drilling, depth; If shut down, cause; date and result of test for g~oltn® content o! gu) Drilled 12-1/4" '. 13-3/8" 7-1/2" hole at ment. Good e. Drilled 12-1/4" NOTE.--There were ................................................ runs or sales of oil' . ............................................... M cu. ft. of gas sold; runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must with thc Division of Mines & Minerals by the 6th of the succeeding ~o~t~u~e~s~q~t~r~e be filed in duplicate directed. APR 7,1967 DIVISION OF MINES & MINERA~ ANCHORAGE T0 T.R. Marshall AT State of Alaska, 3001 Porcupine Drive FROM Union Oil Company of California AT 2805 Denali Street TRANSMITTING THE FOLLOWING: · ,, Fr~m Union TRADING BAY STATE A-4: Tw~ boxes of Cut Core #1 and one box of Co~e 3104.. 5- 3129.5 Fr¢,m Un[on TRADING BAY STATE A-3: / Tw,~ (2) Directional. Surveys ! %'w,~ 2" Induction Electrical Logs; Blue Li~e, Ruts 1-~ On~ 2" Induction Electrical Log, ~epia, Rtns 1-Z ., On~- 5" Induction Electrical Lo~ ~lue Lin(, Run., 1-4 On. Mud Log 900'-11,600' Sepia On~ Mud Log 900'-11.,600' Blue Line . . ,, ., RECFIV[O /~ DD q ,, ~re.~ 16, :1.967 Yradins Bay State ~A-4 Uniom Oil Co. of Calif. Opera,or Dear Ed: In reply co your letter og ~arch 14, 1967 concerning ditch smaples on the $~JecC ~11. Tn~ ts Co a~e ~ ~aC if the ~11 ~ d~l~ in ~e ~i of ~t~ 3~ T. 9 N.~ L ~ ~., S. H., dtC~ ~1~ ~11 ~c ~ r~utr~. ~e ~d ~pr~~ ~re ~tps a~ ~e f~ tn~e~als tn ~he ev~t of ~ coEtng ~ra~. Good luck on ch/o vel1 and rhm~k you for the pro. pc reply to our last le~:t:ero Yours vary truly, Barry Pe~roleu~ Mm-eh 3, 1967 :1805 Delutlt SL'reat A.u~horaSe, AI,~ g9503 .~ 30, 1967, Tho ~ fiXtn~ fee ~ l~e sub.Jec~ uts ~ vi~h ~ ertl q)plica~Jdmt, ene~ ~~tou dif~ prtuetpeli7 from 7our forsmr fq~pl~~ ms ~o r~bo loe8~ of tho Ver~ L'ruly ,~/// / Union Oil Company of California 2805 DENAL! STREET 0 ANCHORAGE, ALASKA 99503 March 1, 1967 Mr. Thomas R. Marshall, Jr. Petroleum Supervisor Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Mr. Marshall: TRADING BAY STATE A-4 UNION OIL CO. OF CALIF. Enclosed is the application to drill the Trading Bay State A-4. This application supercedes the application submitted January 23, 1967, for the same well designation. The application for this well is resubmit- ted since the bottom hole location of the A-4 well has been moved from the SW, N-W, Section 2, T 9N, R 13W, to the NW, SW, Section 3, T 9N, R 13W. Since this is an infill well, will the State require ditch samples? Very truly yours, Edwin H. East District Development Geologist EHE/mm encl. 401 ANC IRE¥. MAR 2 IDIVISION OF MtNL'S & MINERALS ANCHORAGE ~ well No. Form P--1 SUBMIT IN TIE ~ATE* '' ' ~ ...... ST~,TI:: OF .~kL./~SKA (Other tnstruetlona on . ~ :-.. reverse side) O1£' AND GAS CONSI/RVAYION ¢OMMI?TIH/ APPLICATION FORe'PERMIT TO DRILL,-: DEEPEN, OR :PLUG BACK la. TYPE OF WORK b. TYPE'OF WELL WELL WELL .DEEPEN SINGLE ZONE PLUG BACK [-1 MULTIPLE ~_~ ZONE NAME: 0~/OP~RATOR ~ '~' ' · -:"~ ' Union Oil Co. of California 2805 Denal~ Street~ Anchorag~:}:~a~ska~ LOCATIO~ .0~ WELL (Report .locatlon.:clea~ly and in ~ccordance with any State requirements.* ) Tr_adin~ ~,av Monopod, 1611'N & 558'W of SE Corner Sec. 4, sw Co=n = S C"' 14. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICES Approximately 27 air miles NW of Kenai, Alaska 50-133-20001 Effective: July 1, 1964 5. LEASE DESIGNATION AND SERIAL NO ADL 18731 ~. IF INDIAN, ALLOTTEE OR TRIBE NAME 7. UNIT AGREEMENT NAME FARM OR LEASE NAME Trading Bay State 9. WELL NO. 10.PIELD AND POOL, OR WILDCAT Trading Bay, Hemlock ll. arc., T., a., M., OR ELK. AND SURVEY OE AREA Sec. 4, T 9N, R 13W, SM 12, B.OROUGH saI 13. STATE Kenai Penin.I Alaska DISTANCE FROM PROPOSED* LOCATION ~O NEAREST Btm: 3310'S of PROPERTY OR LEASE LINE, FT. (Also to nearest drlg. unit line, if any)lease line ~8. DISTANCE FROM PROPOSED LOCATIONs TO NEAREST WELL, DRILLING, COMPLETED, 0E APPLIED FOR, ON THIS LEA~E, FT. Btm: 2750'E of A-2 16. NO. OF ACRES IN LEASE 3840 19. PROPOSED DEPTH 9050 ' 17.NO. OF ACRES ASSIONED TO THIS WELL 160 20. ROTARY OR CAI41,E TOOLS Rotary 21. ELEVATIONS (Show whether DF, RT, GR, etc.) 22.' APPROX. DATE WORK WILL START* RT 101' above MSL March 10, 1967 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZEOF CASING WEIGHT PER FOOT SETTING DEPTH QUANTITY OF CEMENT 17 1/2 13 3/8 61# 1100 1500 12 1/4 9 5/8 40#- 43.5# 6300 1596 8 5/8 7" liner 26# - 29# 6100-9050 400 1. Drill 12 1/4" hole to 400' and 12 1/4" directional hole to 1100', log as necessary. Open hole to 17 1/2" to 1100'. Run & cmt 13 3/8" 61# J-55 casing to surface. 2. Install 12", 3000# Shaffer double gate & GK Hydrill. Test BOPE. 3. Drill 12 1/4" directional hole to 6300'. 4. Run and cement 9 5/8" casing. 5. Drill 8 5/8" directional hole to 9050'. pletion. 6. Run, hang, and cement 7" ~!line liner. Log as necessary. Run electric logs and evaluate for com- Run collar log, perf and complete. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: ~f proposal is to deepen or plug back, give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer program, if any. 24. I hereb~~~~True and Correct. SIGNED .,.~ ~'~-~"~'~ ~ '- y "/ ~ TITLEDistrict Development Geo1ogi§f~E 7 (This space for Federal or State office use) TITLE CONDITIONS OF APPROVAL, IlO ANY: This application replaces the' application Conservc~tion Comn-,jtte, approved on 1-30-67. AP L AT ....... *See Instructions On Reverse Side ANCHORAGE -I - I J7 -[~ _ TEXACO' UNION. 4i3 I t UNION~ · ~ ~ --- TRADING BAY~ PLATFORM ~ i' !  UN.ION TB"3 ~TRADING B~Y UNIT r i ~ ~~1 ; . 9 ~D~- ,o,~ ~: 9.I 10 I R 13 w ,35 ,3 2 JO ]J JO ] UNION E. TB STATE 11'i UN ION -.MA R ATHON · ADL- 17596 RE. CEIVED MAR g,i967 DIVI,SION OF & MINERALB UNION OIL COMPANY OF CALIFO ALASKA DISTRICT LOCATION TRADING BAY STATE MAP A'-4 N Unlmi O'll ~ of Don Mm. Reyno~cls ~ Oil Ceep~ of Colifora~ ~805 Dmmlt Street: Please £ind e~_.~l, ose~l i:he app~~ permit to drill ~be above capi:ioned well. In ~a event tb~ Trodin~ Bay A,*3 S.o & dry bols, ~hen Mell rumples ~d co~e ~M~M. Very ~ ~. Marshall, Jr. Petroleum Supervisor FORM SA-I B I OOM 9/65 MEMORANDUM TO: [- J~ea A. WillLmmm State of Alaska DIVISION OF M~NES AN~ ~~ DATE : January 30, t967 SUBJECT: Filing Fee Emm!osed are ~ approved copy of ~ha a~plicatio~ for permi~ to drill %T~tu~ ~y State A-4, ~ion Oii (~auy of Califo~, operator, :md a check In the ,~%mt of fifty (850) doll~s for ftl~ fee. . ~ PPLICATION FOR"PER~IT 'TO ':~ DR IL~',~ DEEPEN/"OR 'PEU,G':, B~'C U ion ~1 Co. of California .... ~ .... 4' At surface~adin~ BayMonopod, 551 W, 1617 ~ of SE comer ' -"-~ :Sec; ~4 ,~T 9N ~ R'?i-3w ~': '~'~:~' ~:"~'"-~:" .' :~' "~ '~:~' ....... -~' ..... "':' . At proposed prod. zone 1980~S, 5~E of ~ comer Sec. 2, T 9N, R 13W ..- Sec. 4, T9N, R13W, SM 14. ~mT&Nen ~N Mm~S AN~ DmEeTIO~aOM NEAR,ST TOWN Ga POST oFFIen· 12. B. OROUGH sH~ 18. STaT~ Approx~ately 27 air~fles from Kenai, ~aska Kenai Peninsul~, ~aska ~. ~m,,,c, ,ao~ ~ao~os~. Bottom h~le 1170~ E ~. ~o. o, ,e~,~ ,~ ~,s, /' ~v. ~o. (~ ~ nearest drlE. ~nit l~e~ If any) line 5096 ~. DISTANCE FROM PROPOSED LOCATION* TO NEAREST WELL~ DRILLINO, COMPLETED, ~ OR APPLIED FOR, ON THIS LEASE, FT. NA ELEVATIONS (Show whether DF, RT, GR, etc.) ~x 21. 23. RT 112' above MLLW x~ 19. PROPOSED .DEPTH 13,000' . /- ? 20. ROTARY 'OR CABLE TOOLS Rotary 22: APPROX. DATE WORK WILL STARTe · PROPOSED CA~I~G AND ~2~MENTING PROGRAM ~ / SIZE OF CASING WEIGHT PER FO0"~ /[ SETTING DEPTH QUANTITE OF CEMEN~ SIZE OF HOLE 22" 16" 75 ,__/_~_-- ~' '400' 600 sacks .~, 18 5/8" 13 3/8" ~-×/ J~. ~0-0-6~ .1300 " 12 1/4" 9 5/8" 40/ J 'X, Sx000' 1000 " / / / 1. Drill 22" hole to 400'. Run cn/d cement 16" 75 . Install 16" 3000~ Hydril. " h91/e ' 2. Drill 12 1/4 directional to 2000 . Run IRS ld~. Open hole to 18 5/8", run and cement to surface 13 3//8" 61% csg. 3. Drill 12 1/4" d~ection~}l/hole to 5000*. Drill 9 7/8" Xd~rectional to 13,000' 4. Run logs and evaluate/for comPletion. ,/ \ / / \ No affected parties, /deviated exploratory extension well \ / · kk k / / 9 5/8" casing w~l/only be mn ff hole conditions make it necessary~. / / IN ABOVE SPACE DESCRIBE/P~ROPOSED PROGRAM: If proposal is to deepen or plug back, give data on present productive zSne and proposed new .productive zone. If proposal is to/drill or deepen direetionally, give pertinent data on subsurface locations and measured and true'v~rtical depths. Give blowout preventer program, if any. 24. I hereby , t,i~/~a ForeS~(.nj/' is True and Correct. SI(~NED , ~-- w~'~'~--/~~ TITLE District Exploration Geolog~ ,. 23, 1967 (This spa¢/~/for Federal or State omee use) PERMIT NO. CONDITIONS OF APPROVAL, I1~ ANY: APPROVAL DATE THOMAS R. MARSHALL. Jl~ // / TITLE Executive S~.cr~_tnry DATE 30 Alaska O[I & Gas ~ ~ . ': ,, Conservation Cdmmittee ?:, ~.~ *See Instruction, On Re,e~, Side. ,.~._...~r~:~,,.~c.~op ~-;< )~ h~;'~-'-L{ jAN "~;.u': ~,,e-.,,l::~v/ · 'HDIW-'9£~ ~1 96(~ Z I 'IOV NOH£~W~/iN -NOINd '.kS ,L~'~ 9NtO'¢WJ.'O3 NOIN¢I ~£1~i N"6 J. OI 6 NOINFI $£ O$.Vx3z ,i N OI Nrt~y'~