Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
161-046
tc-apfm 10:}an95 LOCATION CLEARA/qCE REPORT State of Alaska OIL AND GAS CONSERVATION COMMISSION -- oz~6 PTD No. ~ / ~ Memorandum To File: API No. _ . ~0~'-- {O00g- ~o Operator ~nd Da te /6/0~/6[ No~e casing size, w~, depth, ~ vol, & procedure. Long Csg= .... Liner: ,, , Perf intervals - tops Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. - ,, · Well head cut off: Marker post or plate. Location Clearance: Code COLORADO 0IL AND ~A.S COR. POFtAT~0N DENVER, ~OLOItAD O November 15~ 1961 State of Alaska Division of Mines and Minerals 329 Second Avenue Anchorage~ Alaska Attention: Mr. Donald D. Bruce Chief~ Petroleum BranCh Gentlemen: RECEIVED NOV 1'7 196'I Oil & Gas Section Division o£ },Iines and Minerals Alaska Dept. of Namrai Re~urces Re: Core Hole No. 4 Icy Bay - Cape Fairweathm~ Yakutat~ Alaska We are forwarding herewith copies of your "Well Completion or Recompletion Report and Well Log "Report..Also enclosed are copies of the Electrical Log~ Micro Logs Gas and Sample Logs and Chronological Drilling Report for our recently plugged Core Hole No. 4. The filing of this material should complete the records for the plugging and abandonment of our Core Hole No. 4. Yours very truly~ COLORADO OIL AND GAS CORPORATION T. D. Pyburn -- Enclosures 1. New ~ Work- WellJg~ Over WELL COMPLETION OR RECOMPLETION REPORT AND,~WELL LOG DESIGNATE TYPE OF COMPI~ETION: · [-~ Deepen O Plug Back r-] Same ' Reservoir O Different Reservoir ~-] Oil C~ Gas C~ Dry [~ DESCRiJPT~I~ O~ WELL AND LEA~E Operator Colorado 0il an~,-Gas corporat~ion-cJ ~- Address Denver Club :Bui q,,ding; D~i~ver: Colorado Lease Name Anchorage 0_~2B19 .. J Wen Number J Field a Reservoir o ,--~ '~ore Hole N~ ~ Icy Bay-Cape Fairweather Location 2200' ~SL: 200' FEL o£ Section 2?: T32~: R4]E: County I Permit number , ~ Date Issu~ - ~JSept; ~15; 1961 D~te spudded J Date total depth reached j Date completed, ready to Octobe~~ ?f 'i96i'( l~5:~ ,-o o_'~., ~t" ~r0'd~ef "~ A Sec.--TWP-Range 6r Block & Survey JPrev.ious permit number t Date Issued ~k6i '( August 4, 1961 JElevation . J Elevation of casing (bDF':'RIfJ~'~"gl GLRT or-q~e~- hd. flange feet JIf this is a dual or triple completion, furnish separate report for each com- pietion~ Producing interval (s) for this completion Was this well directionally drille._~d?] Was directional su e¥ made? J'Cable tools used (interval) t. Rotary tools used (interval) o - 53 6' - Was copy of directional survey filed ? ?, c jDate filed Type of electrical or other logs run (check logs filed With the commission) E; Micro~ Sample: JDate filed (~ 'At~ached CASING RECORD Casing (report all strings set in .,well?-'c~l~d{~'l~l~, si~l'f~c~,-i~terF/il~d~S;te, ~roaucin~, etc.)~. ~- P~,~o~. J sJ,o ho~,ocd~illo~ /. Sizec casin~;s=''''sets' r Weight ..... (lb./~t.) De~ ~set -'=~, [ .... o .... ~ 1,9 '" cO.,.U .... ' co a ctor z7 . 3-3Z8 / g so t t Size Sacks~ cement Amt. pulled Number per ft. TUBING RECgR~D~-_j~One C 9 ['.~;{J'.,'5 ~ _ ' - 'O'O 'U ~R RECORD j Derth setft. j Packer set at size.ft. ~.~ .Q~_,_...~.~,. Top ft. J Bottom2 ~ ~ ~t. Sacks cement Screen (ft.) PERFORATION RECORD None ACID, SHOT, FMCTURE, CEMENT SQUEEZE RECORD Non( Size & type Depth Interval Ain't. & kind of material used Depth Interval INITIAL PRODUCTION Well P & A Date of first production J Producing method (indicate if flowing, gas lift or pumping--if pumping, show size & type of pump:) Dateoftest t Hrs. tested Choke size Oil prod. durtngtest J Gasprod. durlngtest I Water.prod. duringtest I Oil gravity bbls. MCF bbls. J °API (Corr) Tubing pressure J Casing pressure ductionCal'tedrate°fPr°'j Oilper 24 hrs. Gas Water J Gas--oil ratio bbls. MCF bbls. J Disposition o~ gas- (state whether vented, used for fuel or sold): Senior CERTIFICATE: I, the undersigned, state that I am th~ E~g~eer of the Colorado 0il and ~as Corp. (company), and that I am authorized by said core, any to make this report; a~l~t~ls report was pre- pared under my supervision and d~rect,on and that the~~ therein a~ true:, co. bt ,~l~P compl to the best °f mY kn°wle~Rc[lV[0 ~~~.~~~ signature- ~ ~ - v~-~ 7'/~- Oil ~ Ga~:, Sectio~ ~iv~s~o~ o[ Mine~ ~tnd Mine~IS Alaska Oil and Gas Conservation Commission Well Completion or Recompletion Report and Well Log Form No. P-7 Authorized by Order 1~o~ 1 Effective October 1, 1958 _:,TALL OF FORMATIONS PENETRATED Formation C ~ Top ,:' ~ 29P... :_' 35O 4~0 1620_ 2100 a Zo 2800 36oo ~23o _.. ~62o 4680 Bottom 15o · .200 a: 45o ,. .O ?fi1., O0 2670 2800 3~7o 3doo k3oo k68o ~326. 'iG .' 'ZOO ALt ._ Description* Surface sand c'-Unconsolidated cs ,a,r,_d_-.and ~eb~es -_ _ C c 'Y"..:~_ _lcd C jC .-.' r'. c O" Sand- ..... ' .-Mudston~/shell frame, ts( -- _, ~d ~d pebble congl~e~te w/mudstone Mudstg~e. w/shell fra~~ -. . Mudstone w/shell fragments Unconsolidated conglomerat~ (';,U ' t 0 Conglomeratic mudstone Unconsolidated conglomerate ,~ I t · { \ c' · u ~C-C ' 'S,'.. 22:, ,.., MU~stone ~ .... Unconsolidated cong~LQmerate Mudstone *'i Show all important zones of porosity, detail of all cores, and all drill-stem tests, including depth interval tested, cushion used, time tool open, flowing ' i!and shut.in pressures, and recoveries. , "' , · ~ .~ · INSTRUCTIONS ..... : Attach drillers log or other acceptable log of well. ~ This W~H' C~mpletioTM or'Recompletion report and well log shall be fried with the Alaska Oil and Gas Conservation Commission not later than sixty (60) days after .project completion. YAKUTAT CORE HOLE' NOo 4 Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period October I - October 7 10-1 10-2 10-3 10-4 10-5 10-6 10-7 .Rigging up. Drove one joint of 13 3/8" conductor casing to 20' KB and c-emented with 5 sacks cement° Rigging up. Dug ratholeo Spudded in at 7:00 A.M. Drilled 6 3/4" hole to 560'° Ran 17 joints of 7 5/8", 24~ Spang H,40, R-2 seamless ST&C casing,and cemented 100 sacks construct~=~%'~to CaSing set at 547o55' KB° Drift at 560' is 3/4 degrees° Bit ,~l l0 5/8" Smith-DDT drilled 560' in 6 hours° WOC. Nippled up° Tested BOP's to 800 PSI for 20 minutes° Test OK. ~Drilled 6 3/4" hole from 560' to 1777' (1217') in conglomerate. Mud wt llo T, vis 48° Bit ~2 0SC-3 drilled 1217' in 14½ hours° Drift i degree at ,1775'o Drilled from 1777 ' to 2211~ (434~' ) in soft shale and conglomerate, Mud wt.ll.9~ vis 58~ WL 6o2~ cake 2/~2o Bit ~3, 0SC-3 drilled 184' in 6~ hours. Bit ~4, K2-P drilled 91' in 6½. hours. 6:00 A.M, ,Drilling at ,2294 in soft shale and conglomerate at.1½ minutes per foot° RECEIVED NOV Oil & Gas Section Division of Mine~ and MfneraIs Alaska Dept. of Natural Resources October 9, 1961 YAKUTAT CORE HOLE NO. 4 Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period October 7 - October lO -7 lO -8 10-9 10-10 10-11 10-12 10-13 Drilled fram 2211' to 2801' (590') in soft shale. Drift 3/4 degrees at 2600'. Mud wt ll.9, vis 64, WL 7.4, cake 2/32. Bit '~5, OWL, drilled 211' in ~ hours. Bit ~6, 0SC-3, drilled 337' in ~ hours. Drilled .from 2801' to 2893' (92') in conglameratic mudstone. Bit ~7, S-6, drilled 92' in 11 hours. While running in with Bit '~7 drilled out bridges at 555' and at 645'. While pulling'Bit ~7 Some tight hole was experienced for 9 stands then pipe became stuck. Good circulation was maintained but could not move pipe. Hole had been circulated.prior to pulling out. Backed off pipe at Shaffer-Wagner Bumper SafetyJoint leaving bit, 8 5" drill collars~ crossover 'sub and bottom half of S.W. Bumper Sub in holeo Went in hole with tricone bit with one cone removed to attempt sidetracking but was not successful. TD 2893. Top of fish at 2032. Circulating and conditioning hole every 4 hours while building whipstock at Yakutat. At 7:00 P.M. set and cemented 5½" OD X 28' long whipstock using 15 sacks cement. Whipstock set on top of fish. Top of whipstock at 2004'. WOC. Went in hole with 6 3/4" tricone rock bit but could not drill off Whip- stock. Apparently top of whipstock was bent over when shearing the pin during setting operation. Could not drill off whipstock using 6 3/4" hole opener with a 4~" rock bit on bottom. Circulating and conditioning hole while building new modified whipstock at Yakutat. Entire area having heavy storms and bad communications° October 16~ 1961 RECEIVED NOV 1'/ 196'1 Oil & Gas Sectioa Division ot~ Mine, and Minerals Alaska Dept. ot~ Natural Resoum'e~ YAKUTAT CORE HOLE NO. 4 Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period October 14 - October lO-14 10-15 lO-16 10-17 lO-18 10-19 10-20 10-21 Waiting on whipstock from Yakutat. Circulating and conditioning hole. Set and cemented second whipstock using 15 sacks Portland cement. Finished cementing at noon. Top of whipstock at 1977'. Circulating and conditioning mud and hole while WOC. After W0C 24 hours cement too soft. After waiting an additional 6 hours drilled off to 23' below top of whipstock using 5 7/8" cross section rock bit, sub and drill pipe. Ran 6~~'' tricone rock bit and drilled 12' below top of whipstock. Circulated 3 hours before pulling out of hole while waiting for high winds to subside. ~ Went inhole with 6 3/4" tricone rock bit ~and one 63/4" 3-point reamer but could not drill off .whipstock. Wentback in hole with 6~" tricone rock bit and 3-point reamer. Drilled 20' past top (to 1997') and along side of whipstock. Bit and reamer assembly hanging up badly on whipstock. As side- tracking job was not successful pulled out of hole and went back in hole and set a 40-sack cement plug from 1650 'to 1450. WOC. Circulating and conditioning hole. Working on pump and motors. Went in hole with 6 3/4" rock bit ~on one single of drill pipe below and 5" drill collar. Found top of cement at 1421'. Polished off plug top to 1425' and took survey. Drift of hole at 1425' was 1 degree. D~illed off cement plug at 1426' to 1475' using 6 3/4" rock bit. Drift at 1475' was 5 degrees and 3© minutes. Drilled 6 3/4" hole from 1475' to 1986~ (511 in new hole). Drift 5½ degrees at 1885'. Mud wt 11.6, vis 56, sand 1~, W-L 3.9, cake 2/32. Bit ~13, 0SC-3, drilled 111' in 5 hours. Bit ~14, 0SC-3, drilled 348' in 6½ hours. Bit ~15, 0SC, drilled 101' in 5 hours° 8:00 AcM. Drilling at 2069 at 3 minutes per foot° NOTE: Additional bits used since drill pipe stuck: Bit ~7~ 6 3/4"~ S-6 drilled from 2600~ to 2891~ (291') Bit ~8~ 6 3/4"~ CP~ new° One cone removed for Sidetracking Bit ~9, 6 3/4", S-6, new. Used for circulating hole~ Bit ~10, 5 5/8", Reed 2-C, Used on whipstock EIVED Bit ~12~ 6 ~/4"~ W-7, used in sidetracking REC NOV 17 1961 October 23, 1961 Oil & Gas Section Division o[ Mine, and Minerals Alaska Dept. of Natural Re~ourc/e~ YA~AT CORE HOLE NO. 4 Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period October 21 - October 27 10-21 10-22 .lo-23 lO-24 lo-25 10-26 10-27 lo-28 Drilled 6 3/4" hole from 1986' to 2531' (545). Drift 4 degrees 15 minutes at 2093'. Drift 3 degrees at 2530'. Mud wt 11.9, vis 58, sand 4, WL 3.8, cake 2/32. Bit ~16, Ka-P, drilled 107' in 7½ hours. Bit #17, OWV, drilled 438' in 9 hours. Drilled 6 3/4" hole from 2531' to 2810' (279'). Mud wt 12.3, vis 55, sand 3.5, WL 3.6, cake 2/32. Bit ~18, EMIV, drilled 81' in 6 hours. Bit ~19, K2-P, drilled 149' in 7l 2 hours. Drilled 6 3/4" hole from 2810' to 3280' (470'). Mud wt 11.8, vis 49, sand 3, WL 4, cake 2/32. Bit ~20, K2-P, drilled 174' in ~ hours. Bit ~21, R-P, drilled 47' in 5 hours. Drilled 6 3/4" hole from 3280' to 3655' (375'). Mud wt 12.5, vis 55, sand 5, WL 4.3, cake 2/32. Bit ~22, S3, drilled. 324' in 7¼ hours. Bit 0SC-3, drilled 236' in 7½ hours. Bit ~24, ES1C, drilled 44' in 3¼ hours. Drilled 6 3/4" hole from 3655' to 3925' (270'). Mud wt 12.8, vis 54~ sand 2½, WL 4.7, cake 2/32. Bit ~25, SV2, drilled 86' in ~ hours. Bit OSC, drilled 49' in 5½ hours. Bit ~27, 0SC-3, drilled 205' in 7½ hours. Drilled 6 3/4" hole from 3925' to 4203' (278'). Mud wt 12, vis 49, sand 3, WL 4.8, cake 2/32. Cored from 4052' to 4059'. Recovered. 6'. Bit ~28, S-3, drilled 127' in 8 hours. Core Bit ~l, drag, drilled 7' in 1 3/4 hours. Drilled 6 3/4" hole from 4203' to 4422' (219'). Mud wt 12.7, vis 53~ sand 2, WL 5.6, cake 2/32. sBit ~29, or, drilled 64' in 6½ hours. Bir ~30, OSC~ drilled 52' in 7½ ho~&r . 8:00 A.M. Tripping at 4484' in soft shale and conglomerate. October 31, 1961 %1 YAKUTAT CORE HOLE NO. 4 Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the Period October 28 - November 5 lO-28 lo-29 10-30 lO-31 11-1 11-2 11-3 11-4 11-5 Drilled from 4422' to 4628' (206). Mud wt 12, vis 55, sand 2.5, WL 5.5, cake 2/32. Bit ~31~ S-3, drilled 189' in l0 hours. Circulated 8 hours waiting on high winds to subside. Drilled from 4628' to 4708 (80'). Mud wt 12{ vis 54, sand 2, WL 4.5, cake 2/32. Bit ~32, ES-l, drilled 146' in 7~ hours. Bit ~33, S-6, drilled 40' in 6 3/4 hours. Drilled from 4708' to 5014' (306'). Mud wt 12, vis 50, sand 2.5, WL 5, cake 2/32. Bit ~34, OSC, drilled 286' in l0 1/4 hours Bit ~35, 0SC-3, drilled 58' in 7~ hours. Drilled from 5014' to 5143 (129'). Mud wt 12, vis 50, sand~ 2.5, WL 4.5, cake 2/32. Bit ~36, S-6, drilled 84' in~7~ hours. Bit ~37, S-6, drilled 45' in ~ hours. Drilled from 5143' to 5320' (177'). Mud wt 12, vis 44. Bie ~38, M4-N, drilled 138' in 7½ hours. Bit ~39, M4-L, drilled 39' in 3 hours. Core ~R from 5320' to 5326' (6'). Recovered 6'. Circulated and con- ditioned hole. Ran Schlumberger IES and Microlog. Rig lines freezing. Cleaned out hole and conditioned mud. Ran Schlumberger sonic and dipmeter logs. Started laying down drill pipe prior to abandonment. Ran abandonment plugs as follows: Plug ~l 3650' - 3550'. Cemented w/30 sacks cement. Plug ~ 600' - 500'. Cemented w/25 sacks cement. Plug ~3 Plugged top of hole w/8 sacks cement. Core Hole ~4 plugged and abandoned. Laid down drill pipe and tearing down rig~ FINAL REPORT. November 13, 1961 NOV 17 1961 Oil & Cas Sect/on Division of Mine= and Minerals Alaska Dept. o1[ Natural Resource~ ~ILLI~ ~TE MUD GAS ~-,.x~. ~.~/-,. ~PTH LITHOLOGY ---~,~-,o,.~ FORMATION DESCRIPTION Y .... ~: I ~on of Mine~ and Mineral ~a ~ept. ot Natural Re'hr, 0 5' /o 0 /o ~.o - ' WELL: \-,." £LEV: . --- , , , RATE MUD GAS ../..~ [::)E:PTH LITHOLOGY --,...~..~.~-.o~'~ FORMATION DESCRIPTION · ! I .... . ,.~,-- · I I' \ I ........ '"' ~O'O I .... '.'\' _'~_ , - - - , t5 ~,r1 f~-,~,,~.. :z.~ ~,~ ~/s~',x ..~-'~',,,~ ..... t I ..J - I I -- . , I ....., ... ~. , . -~' ...... i _~. __. ~, ..... .... ! ,, - h.--- ~ .... ~'"-~'~ ' ~,' · ,~- · - ,,- ,, ~ ,,., ~,.. .... ~ - '~ ' //~i~ ~ ' ' - -~ ~ ~ ~ .... '~ Kk"- ' '. ', '"- ' · I · ' ..... L , .'" "'" ',1 , ~,. -_ ,~ .~ -,. ~ .... ~ ~ I ~ ~ ~ ~ I i ~ , ~ ,..~',),.},b,'~ ~ i ....... WE SPUD: //~ -- / ""/4:~I COMPLETE: GEOLOG,ST, DRILLING I~t~ ~-,./~ m ~*/~,- ~PTH LITHOLOGYI MUD GAS -- ~*~-*o*~ FORMATION DESCRIPTION / m , DRILLI~ ~T[ MUD GAS ~MI./FT ~ FT/MI. DEPTH LITHOLOGY --m,m~-,o,.~ FORMATION DESCRIPTION - [ II J WELL: EL£V: /~~ DRILLING RATE MUD GAS )~f',~:./FT ~'. ~./,.,,. DEPTH LITHOLOgY --,~[*m-E--*O~'.L FORMATION DESCRIPTION .... i LOCATI ON~ ..... ' "'"-' _~ . , DR1LLI~ ~TE MUD GAS ~,./~* = ~*/~,. DEPTH LITHOLOGY --~.~-.o~ FORMATION DESCRIPTION I i I I i i i I ! i I I I I I I I i i i ,, .... ~ ... I I L .. I .... I , .. ,~ ~ ....... . I , J J I Ill Iii I I ~ , ~ , ,Il ,ii Ii il ' ~ ~ .... WELL; ELl'V: _ ~ILLI~ ~TE MUD GAS .' ~,./~T m ~.~,N DEPTH LITHOLOGY ---[*-~-.o.~[ FORMATION DESCRIPTION I .... I ~ , , ,, DRILi'IN(~ RATE MUD GAS ~,~/~.= ~./~,. DEPTH LITHOLOgY --~E*.~--~O,AL FORMATION DESCRIPTION Im I .. ..... , _ ~ ,,, .... , ~~ ..... :i -- _ . -. ~ L ... :~ " 1 L ",.-:-~ ........ WELL: , ,._o~,,-,-,o,.,:_ ..~'A _34- ¢/ C~,"?~... DR1LLIN~ I~T£ MUD GAS )i~,,,,,,,/rT ,", ,:T/,.,,~ )EPTH LITHOLOGY ----METHANE--TOTAL FORMATION DESCRIPTION -. ! I ..... , ! .. I ., _ ~........ ,, .. , ..... ,:o,,,,,...,,,,,,.: C..o.('., {' ...w,.-,_,_:.. .,.~/./ - ~ ,~,_,,.,.,:. ,,:.¢ .,~__~ 'J~RiLL~NG RATE MUD GAS ~,.,~N/F~' = F'r/~,,N DEPTH LITHOLOgY --,.,~,~-m,A~. FORMATION DESCRIPTION 'i'" .... "'"'"' ~"" .... ~ ..,.....,~ .~4~ · I _ , ~ ~ ' ,~'~.~.., ! -- ~..4..t., ,3 . I - i -, I ..... -t - -- i I i .......... ! ! I , , ! ! d~ ~ . ~ i i i , ,i i, ii DRILU~ ~TE MUD GAS ~,~/~T = FT/.,~ ~PTHI LITHOLOGY --~..~-.o~.. FORMATION DESCRIPTION ~ ~ - . f ...... ~ ,,, , ,, ~Illl~ ~TE MUD GAS ~,~/~* = ~*/~,~ ~PTh lithOlOgY --~[,~-,o,~ FORMATION DESCRIPTION l ~ i i ~,./~.~ ~./~,- ~PTH LiTHOL06Y ~UD 6AS ---~,~-,o,-~ FORMATION DESCRIPTION . ~~ - . , -~ ~ .... ; " "' Il ~, i " ' ,, , ..~o~ _J ~ , - ,, , , ~ ,, i " ~'¢ ~ ' -- , , 4 .... ~ I ...... ~' 4 ......... ~ ,, , ,, I . ~ - i ~ ~ ~ - ~ ,, , . ,l ...... ~1 , , : ~-- I --~¢o,.. , ... I .. ~ , ,, , 1_1 ill I I J I I t I I ~ ~ ,~l I ,Il J I I II D~iLCi~ ~TE MUD gas ~-,~/~. = ~./~,~ ~Pth LITHOLOGY --~.~-.o.~ FOR MATION DESCRIPTION , I _ , , ~ , I ~............... .............. t i i ~ . ,i i,,l i hx ,, , .. t .............. t ,, i DR1LLI~ ~TE MUD GAS ~,~/~* = ~*/~,~ ~Pth LITHOLOgY --~.~-.o.~ FORMATION DESCRIPTION ~- -~ [ i i t - 5500 I - 8ept~ 15, 1961 I mu in ~t o~ ~ ~ppl.~C~ foz permit ~o drill vel1 Ho. "Gore Hole' your app]Lfd~mttou Ls ~,roved subject ~o the ~olXos~ emadittens: 1. ~ lmm~ 300' of f~trf~ ~~ s,lmll be mmmu~d in ~e bole, 2~ #t11 you p~ ~ an addtt~l p,ht sheutq the ~ion of the ~ubj~t very Dousld D. Bruce APPLICATION FOR PERMIT TO DRILL, DEEPEN OR PLUG BACK APPLICATION TO DRILL~[] DEEPEN [] NAME OF COMPANY OR OPERATOR PLUG BACK [] DATE Colorado Oil and ~as Corporatlca Address 1000 Denver Club Bailatng City State Denver Colo~ DESCRIPTION OF ~,VELL AND LEASE Name of lease %Vell number Elevation (ground) Icy ~ay - Cape Fair~ather C~re ~ole No. ~ ~' ~ ~Vell location (give footage from section lines) Section--township--range or block & survey Field & reservoir (If wildcat, so state) County Co~ ~ie, ~ot a ~cttm ~st Y~tat V~~ Distance, in miles, and direction from nearest town or post office Nearest distance from proposed location Distance from proposed location to nearest drilling, to property or lease line: completed or applied~for well on the same lease: Proposed depth'. Number of acres in lease: If lease, purchased with one or more wells drilled, from whom purchased: Rotary or cable tools Name Approx. date work will start ~ertem~r 20, Number of wells on lease, including this well, completed in or drilling to this reservoir: One cote ~e (t,h~$ core hole.) Address Status of bond C~~ state ~-'~-a-~ ~,0o~ Remarks~ ('If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zone and expected new producing zone) This ~ieation is for the ~rtlling of a core hole, not a producti~n t~st. CEBTIFICATE: I, the ~dersigned, state that I am the ~ of the (company), and that I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are true, correct and complete to the best of my knowledge. Permit. Number: 46-61 Approval Date: September 1~, 1P61~ Approved By: Chief, Petroleum Branch Notice: Before sending in this form be sure that. you have given all information requested. 1VIuch unnecessary correspond- ence will thus be avoided. See Instruction on Reverse Side of Form Alaska Oil and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. I Effective October 1, 1958