November 20, 1995
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: (907)279-1433
FAX: (907) 276-7542
UNOCAL
Kevin Tablet, Land Manager
P. O. Box 1.96247
Anchorage, Alaska 99519-6247
Re: Location Clearance Inspection
Unacceptable - Swanson River Field Wells
Dear Mr. Tabler:
'On July 27, 1995 ourinspector, Lou Grimaldi, inspected SeVeral abandoned Swanson River Field'
locations for location clearance. He noted additional work that was necessary on five (5) Swanson
River Field wells before Location Clearance could be granted.
SCU 13-3 PTD 7545 On the marker post, "S~vanson River Unit" xvas listed instead of
"Soidotna Creek Unit".
SCU 32A-5 PTD 73-026 Flowline shut-in point on south side of pad and a culvert section
with a "T" handle protruding from it.
~~1~1~5 .......... PTI~6~t-~ Pipes protruding from the pad.
S RU 312-22 PTD 62-014 On the pad: gas injection header with gauge reading 2450 psi,
2" pipe and part of 40" culvert protruding from the gravel. A
· ditch with standing ~vatcr on the north side of the pad.
SRU 12-34 PTD 60-029 An open gravel pit approximately (100' x 70' x 15' deep) with
three "3 pipes marking the entrance
A Commission representative can revisit these sites after the items described above have been
s may also have closure responsibilities.
David ~ohnston X ~
Chairman ~_~ ) · -
enclosures: Memorandum and Location Clearance Report.
cc: Joe Dygas, BLM, tv/enclosures
Blair Wondzell
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
David Johnston,
Chairman-"-~
DATE: July 27, 1995
THRU: Blair Wondzell, ~ FILE NO:
P. I. Supervisor
FROM: Lou Grimaldi, .~.,,~ SUBJECT:
. Petroleum Inspector
LO 21-15.DOC
Location Clearance Inspection
Arco #21 - 15
Swanson River Field
PTD #61-012
Thursday, July 27, 1995: I made a Location Clearance inspection on the Arco
well #21-15 in the Swanson River Field.
This marker is situated on a gravel pad which ! found to be clean and well
groomed. There were some pipes protruding from the pad which may be the old
flowlines or gas lift header.
The following Info was on a 6" marker post:
Arco Alaska Inc.
Swanson River Unit
A-028406 SRU 21-15
660' FNL + 1980' FWL
Sec. 15, T 8N, R 9W, SM.
I walked the perimeter and found the area surrounding the area to be quite clean
with no impact from the previous production activity.
I recommend final clearance be given if the flow line/gas injection point is not a
issue.
SUMMARY: i made a Location Clearance inspection on the Arco well #31-15 in the
Swanson River Field.
Attachments: LO21-15.XLS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Surface Abandonment I Location Clearance Report
( Title 20 AAC 25, Article 2 )
Operator: Arco Alaska Inc.
Address:
PO Box 100360
Anchorage Alaska 99510-0360
Surface Location:
660 F N L, 1980 F W L
Section 15 ,T 8N ,R 9W ,M SM
Well Name: SRU 21-15
PTD No.: 61-0012
APl No. 50- 133-10139-00
Unit or Lease Name: Swanson River Unit
Field and Pool: Swanson River Field
Downhole P&A Date: ?
Inspection Date: 7/27/95:2OAAC25~l:25,ABANDONMENT MARKER: I Approval Date:
Steel Post OD: (4" min) 6"
Top of Marker Post Closed With:
Distance Below Final Grade Level:
Side Outlets:
"Length (10' min.) ft. Height Above Final Grade Level (4' min.) 6'
Welded (Welded, Cmt., Cap), Set: ? (On Wellhead, Csg, In Cmt)
ff.
All valves and nipples removed ? All openings closed ? With
ft.
Marker Plate Diameter: "Thickness: "Distance Below Final Grade Level:
Marker Plate Attached To: Wellhead Cutoff Csg Other
Information Beadwelded Directly to Marker Post or Blind Marker Plate:
Operator: Arco Alaska Unit / Lease Name:
Well Name: 21-'15 Remarks: A-028406
Surface Location:
660 F N L, 1980 F W L
Section '/5 ,T 8N ,R 9W ,M S
( Note when different from file information)
Swanson River Unit
PITS:
Inspection Date: 7/27/95:20 AAC 25,170. LOCATION CLEANUP: I Approval Date:
Filled In: ? Liners Removed or Buried: Debris Removed:
SURFACE CONDITION OF PAD AND / OR LOCATION:
Clean: X
Gravel- Smooth ( Rough, Smooth, Contoured, Flat, Compacted )
Type &Quan. of Debris if any remaining on pad and / or location:
TYPE AND CONDITION OF SURROUNDING AREA:
Wooded ( Wooded,Tu ndra, Grass, Brush, Dirt, Gravel, Sand)
Clean: X Type & Quan. of Debris if any remaining on surrounding area:
TYPE AND CONDITION OF ACCESS ROAD AND SURROUNDING AREA:
Grave/ ( Dirt, Gravel, Ice, Other)
Clean: X Type & Quan. of Debris if any remaining on access road or surrounding area:
CLEANUP WORK REMAINING TO BE DONE:
Remove old flowline from location
RECOMMENDED FOR APPROVAL OF ABANDONMENT:
Distribution:
orig - Well file
c- Operator
c- Database
c - Inspector
Reason:
Gravel pad and old flowline.
FINAL INSPECTION:
INSPECTED BY:
Yes No X ( If "No" See Reason )
Yes No
Louis R. Grimaldi
DATE: 27-Jul-95
FI-000 (Rev. 3/93) LO21-15.XLS
l¢-apfm
lOJan95
LOCATION
CLEARANCE
REPORT
State of Alaska
OIL AND GAS CONSERVATION COMMISSION
ETD No. ~/- 0{~
Memorandum To File: API No. . . /~-{d)/~' O O
Well Name
Opera tor
Loca ti on
~nd Date
Spud: ~/~/6~ , TD: /f, 3~ , Completed
No%e casing size, w~, depth, ~ vol~ & procedure.
,~ c.g, /~" ~ ~ J ,~ /~, ~//, r~,
Perf inte~als - %ops: ~. f%9 - f~. ~O
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
Well head cu2 offt
Marker post or plate:
Location Cie&ranter
Signed
Date
ORIGINA /
' ' '" ~" STATE OF ALASKA ~
ALASKA OIL AND GAS CONSERVATION COE,.v,iSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classification of Service Well
OIL r'-] GAS ~ SUSPENDED [-'-] ABANDONED r'~ SERVICE ~
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc $1-0012192-136(403-10 APPRV NO.)
,
3 Address 8 APl Number
P.O. Box 100360, Anchorage, AK 99510-0360 133-10139-00
4 Location of well at surface,..,,-~,~,,~,.r~-I t"~"~l't~e,~ 9 Unit. or Lease NameI{,~,'v¢¢
660' FNL, 1980' FWL, SEC 15, T8N, Rgw, SM ~,.lllftEI),.....~-v~'"" nr~T~., ..-, ........ ,.,, ,~,. UNIT
At Top Producing Interval ~'~-~--~_~t 10 Well Number
660' FNL, 1980' FWL, SEC 15, T8N, Rgw, SM :~,t~'--~ ~'~ SRU 21-15
At Total Depth .......' ~-- ~'F~': 11 Field and Pool
660' FNL, 1980' FWL, SEC 15, T8N, R9W, SM SWANSON RIVER FIELD
5 Elevation in feet (indicate KB, DF, etc.) ] 6 Lease Designation and Serial No. HEMLOCK OIL POOL
RKB 375'I A-028406
12 Date Spudded04/09/61. 13 Date T.D. Reached 14 Date Comp., Susp. or Aband.06/11/92 (P & A) I15 water Depth' if °ffsh°reNA feet MSL116 N°' °f c°mpletj°~s
17 Total Depth (MD+TVD) 18 Plug Sack Depth (MD+TVD) 19 Directional Survey 120 Depth where SSSV set 21 Thickness of permafrost
11,344' MD 11,344' TVD SURFACE YES r-'] No [~I NA feet MD
NA
22 Type Electric or Other Logs Run
~/A
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
22" SURF 30'
11-3/4" 47# J-SS SURF 1934' 1175 SX CMT(.3% HR-4)
7" 20#/23ff/26#/29# N-80/P-110 SURF 11080' 2200 SX CMT(.3% HR-4)
5-1/2" 20# N-80/P-110 10,856' 11342' 42 SX CMT
, I
,
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET IMD)
N/A
' 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED
SEE ATTACHED REPORT OF OPERATIONS
27 PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ~
FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
, ,
28 CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas Or water. Submit core chips.
N/A
RE'CEIVED
O U L 2 2 1992
Alaska 0il & Gas Cons. Comrniss~u,,
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recoverd and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
N/A N/A
Sl. LIST OF A'I-FAOHMENTS
REPORT OF OPERATIONS. P & A SCHEMATIO
S2. I hereby cedily thai the to~egoing is Irue and correc! Io lhe best o! my knowledge
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached sup.olcmental records for this ,A,,~lt *~'.~'Pd show f¼~' d "
Cement 300'-Surface
7" Bride
Estimated TOC @ 1,236'
I 50 Sxl
13.0
PPg
kill wt
mud
SRU 21-15 P&A
Schematic, May 1992
FINAL Well
Abandonment
Note: All measurements are KB reference
Original GL to KB is 15'
260 Sx
200 Sx
TOC @ 2534'
PE
7" Retainer @ 3,140'
Perforations 3,195'-3,200'
7" Bridge Plug @ 3,240'
Estimated TOC @ 10,193'
13.0
PPG
13.0
PPg
kill wt
mud
11-3/4" 47# Casing @ 1934'
11-3/4" x 7" Annulus Capacity =
.0699 Bbl/Ft
.3927 Cu. Ft./Ft
100 SxJ
B3 Zone
B4 Zone
RECEIVED
J U L 2 2 1992
Alaska Oil & uas dons. (;ommissio~
Anchorage
Existing 25 cu ft plug
7" Bridge Plug @ 10,831'
Top of Liner
@ 10,856'
TOC @ 10,857'
Top of Fish
@ 11,036'
Perforations
11,139'- 11,220'
PBTD @ 11,270'
0,651 PBTD
7" Casing @ 11,080'
Detail: 7"
7"
7"
7"
7"
7"
29#, N80
26#, N80
23#, N80
26#, N80
29#, N80
29#, P110
0-257'
257'-1190'
1190'-4809'
4809'-6663'
6663'-8465'
8465'-11,080'
Capacities:
Wt. Bbl/Ft
23# = .0393
26# = .0382
29# = .0371
Cu. Ft./Ft
.2210
.2148
.2085
5" 20# Casing @ 11,344'
Capacity = .0170 Bbl/Ft
.0954 Cu. Ft./Ft
ARCO ALASKA INC.
DAILY OPERATIONS
PAGE: 1
WELL:
BOROUGH:
UNIT:
FIELD:
LEASE:
API:
PERMIT:
APPROVAL:
21-15
KENAI
SWANSON RIVER
SWANSON RIVER
50-133-10139
ACCEPT: 05/17/92 01:05
SPUD:
RELEASE:
OPERATION: P & A
DRLG RIG: NONE
WO/C RIG: CTU
05/17/92 ( 1)
TD: 0
PB:10857
05/21/92 (2)
TD: 0
PB:10857
06/06/92 (3)
TD: 0
PB:10193
06/07/92 (4)
TD: 0
PB:10193
PRESSURE TEST "@ 30' MW: 0.0
RU VECO TO 11.75 BY 7 ANNULUS, TEST LINES TO 3000 PSI. PUMP
15 BBLS WATER TO FILL ANN. EST. INJ RATE 1.5 BPM 500PSI.
PUMP TOTAL 50 BBL. PRESS DROP TO 0 PSI IN 10 MIN. R/U ON 7"
CSG VALVE. TEST TO 1500 PSI F/30 MIN W/ H20. TEST GOOD.
BLED TO 0 PSI. R/D
WELL SECURED "@ 30' MW: 0.0
R/U WIRELINE & PT LUBE. NO PRESS BUT LIGHT FLOW. RIH W/ 2.3
GR TO 9472 WLM.
HIT HEAVY VISCOUS FLUID @ 7300 WLM. FLOATED TOOL STRING TO
9472. FLUID TOO THICK TOi. GO DEEPER. P/U WT 800#. POH, R/D
WELL SECURED "@ 30' MW: 0.0
R/U ARTIC RECOIL & HOWCO. PRESS TEST LINES TO 4000 PSI.
RIH W/ COILED TBG. FOUND HEAVY MUD @ 9551' , CIRC TO 10,
6~. TAGGED PBTD. MIXED & PUMPED 75 SX(17 BBLS) CL-ASS
"G" CMT + 5 % MICROBOND HT + .017 GPS FDP-C434B + .5% LAP-1
+ .15 % CFR-3 + .25% BENT + .25% LWL + .09 GPS HALAD-344 @
15.6 PPG. P/U COIL @ 25 FPM WHILE SPOT CMT PLUG @ 1 BPM.
CALC''D TOC @ 10m.!~.~ FOLLOWED CMT W/LBBLS H20 AND
DISPLACED HOLE W/13.0 PPG MUD. CIP @ 1700 HRS 6-5-92.
FINISHED DISPLACE H20 IN 7" CSG TO 13.0 PPG MUD. R/D
ARCTIC RECOIL._I~STABLISH INJECTION RATE DOWN 7" X 11-3/4"
~'~'-~ ~--/~'~-~-~-'1/2 BPM @ 750 PSI. MIXED AND PUMPED 200
SX(41 BBLS) CLASS "G" CMT + .15% HALAD-344 + .2 % CFR-3 @
15.8 PPG. DISPLACED TO SHOE W/97 BBLS H20. MIXED & PUMPED
110 SX(22 BBL) CLASS G CMT + 2.0 % CACL + .2% CFR-3 @ 15.8
PPG. SHUT IN ANN. R/D HOWCO.
"@ 30' MW: 0.0
INSTALLED 7" 5000# VALVE AND TREE CAP. INFO FROM DAILY
REPORT 06-08-92.
06/08/92 (5)
TD: 0
PB: 3140
WELL SECURED "@ 30' MW: 0.0
R/U ATLAS WL. PRESS TST LUBE TO 1500 PSI. RIH W/ 5.903
GAUGE RING, JUNK BSKT, GAMMA RAY AND CCL. LOG 3000-3400.
POH. RIH W 7" BRIDGE PLUG TO 3240. POH. RIH W/ 4" PERF GUN.
PERF F/ 31~_~95r3200 AND 3065-3070 Wi 4 SPF. POH. RIH 2/ 7"
CMT RETAINER'~:'T-0~-~I~4~ POH. R~'~'~.'~'~EC~E WELL.
RECEIVED
J U L 2 2 1992
Alaska Oil & Gas Cons. Commission
Anchorage
WELL : 21-15
OPERATION:
RIG : ROLLN RIG 5
PAGE: 2
06/09/92 (6)
TD: 0
PB: 2935
06/10/92 ( 7)
TD: 0
PB: 2534
06/11/92 (8)
TD: 0
PB: 2534
06/13/92 (9)
TD: 0
PB: 2534
WELL SECURED "@ 30' MW: 0.0
R/U ARTIC RECOIL AND HOWCO. PRESS TST SURF LINES. FILL WELL
W/ 20 BBL H20. RIH W/ BAKER STINGER, COULD NOT STAB INTO
CMT RETAINER. GOT BLM VARIANCE TO SQUEEZE THRU PERFS F/
3065-3070. EST INJ RATE 1.5 BPM, 4000PSI. PUMP 100 SX (20.5
BBL) CLASS G CMT + .4% HALAD 344 + .2% CFR-3. PUMP RATE
DROPPED TO 1/4 BPM @ 4000 PSI W/CMT IN TBG. SQUEEZE CMT
AWAY @ 1/4 BPM 4500 PSI W/450 PSI ANNULAR SURFACE PRESSURE.
LEFT 5 BBL CMT ON TOP OF PERFS. EST TOC @ 2935'. POOH AND
FLUSH CTU. CHECK STINGER. R/D ARCTIC RECOIL & HOWCO.
SECURE WELL.
WELL SECURED "@ 30' MW: 0.0
R/U ARCTIC RECOIL & HOWCO. PRESS TEST CMT PLUG @ 2534'T0
1500 PSI FOR 15 MIN. (BLM TEST). RIH W/I-i/2" OPEN ENDED
NOZZLE ON CTU. TAG CMT @ 2534' (CTM). ESTABLISH CIRC
1-1/2 BPM @ 4000 PSI. MIX AND PUMP 260 SX CLASS G CMT +
.2% HR-7 + .2% CFR-3. POOH LAYING IN CMT PLUG. DISPLACE
CMT W/20 BBL WATER. CIRC 43 BBL 13.0 MUD. DISPLACE MUD
W/25 BBL WATER. EST TOC @ 1236' M/U BAKER 3BB-CT SETTING
TOOL W/7" BAKER K-1 BRIDGE PLUG. RIH TO 300'. PRESSURE UP
TO 2500 PSI. SET BRIDGE PLUG. PRESS TO 3500 PSI. POOH.
RIH W/1.5" OPEN ENDED NOZZLE TO 300'. MIX 50 SX CLASS G
CMT. POOH LAYING IN CMT PLUG. DISPLACE CMT W/20 BBL
WATER. POOH TO 10' FLUSH TREE W/5BBL WATER. POOH. EST
TOC 10' BELOW WELLHEAD. R/D ARCTIC RECOIL & HOWCO. SECURE
WELL.
WELL SECURED "@ 30' MW: 0.0
CLEAN MUD AND CMT OUT OF TANK W/ SUPERSUCKER. TRANS 195 BBL
MUD TO
SCU 243-4 AND INJ W/ 60 BBL WATER. WASH CELLAR AT SRU
314-27. PREP FOR CELLAR REMOVAL. R/D CTU. REMOVE EXCESS
SACK MUD MTRL.
"@ 30' MW: 0.0
DIG OUT CELLARS ON BOTH WELLS W/BACKHOE. HAUL CMT CELLAR
WALLS TO KENAI. HAUL OIL CONTAMINATED SOIL TO SWANSON
RIVER SOLID WASTE DISPOSAL PIT. WELD P & A MARKER POST &
BACK FILL HOLE W/GRAVEL.
SIGNATURE:
(dr~perinte~u~nt)
DATE:
RECEIVED
J U L 2 2 1992.
Alaska Oil & Gas Cons. ~ommissJo;',
Anchorage
ARCO Alaska, Inc. _~
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
May 21, 1992
Mr. Mike Mindcr
State of Alaska
Alaska Oil & Gas Conservation Comm.
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mike:
Subject: SRU 21-15 Plug and Abandonment
I have enclosed a revised Sundry Notice for the plug and abandonment of
SRU 21-15. The revisions cover cementing the surface casing shoe and the
surface plug of the production casing/surface casing annulus via annular
pumping from surface. Additionally, 2 shallow gas sands have been
identified in SRU 21-15. These zones will be isolated via a coiled tubing unit
squeeze cementing operation. The bridge plug originally stated to be run
above the top of the existing cement plug has been eliminated. Instead, a
balanced cement plug will be placed on top of the existing cement plug.
ARCO requests a waiver on tagging/pressure testing this plug based on the
fact that the original cement plug tested to 1500 psi on 5/17/92.
If I can provided additional information concerning the above mentioned
procedure, please feel free to call me at 263-4243.
Sincerely
Hans T. Erickson
Drilling Engineer
cc.
A. W. McBride-ATO 1488
File
RECEIVED
MAY 2 2 1992
Alaska Oil & Gas Cons, Commission
0 i{ 16 l
ALASKA OIL AND GAS CONSERVATION COMMISSiON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon
--
Alter casing _
Change approved program
'2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
Suspend
Repair well _
~( Pull tubing _ Variance _
5. Type of Well:
Development .~
Exploratory _
Stratigraphic _
Service _
4. Location of well at surface
660' FNL, 1980' FWL, Sec 15, T8N, R9W, SM
At top of productive interval
660' FNL, 1980' FWL, Sec 15, T8N, RgW, SM
At effective depth
At total depth
660' FNL, 1980' FWL, Sec 15, T8N, Rgw, SM
Operation Shutdown _ Re-enter suspended well_
Plugging _ Time extension _ Stimulate _
Perforate Other x_Abandon
6. Datum elevation (DF or KB)
375' KB
7. Unit or Property name
Swanson River Unit
feet
8. Well number
SRU 21-15
9. Permit number
10. APl number
11. Field/Pool Swanson River Field
Hemlock Oil Pool
12. Present well condition summary
Total Depth: measured
true vertical
Effective depth: measured
true vertical
11,344' feet
11,344' feet
1 I ,344' feet
11,344' feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length
30'
1934'
11 080'
486'
measured
11,220'-11,139'
true vertical
11,220'-11,139'
Tubing (size, grade, and measured depth)
Size
22"
1 1-3/4"
7"
5-1/2"
Packers and SSSV (type and measured depth)
13. Attachments Description summary of proposal
Wellbore Schematics, Well Histor)/, Area Map
14. Estimated date for commencing operation
May 24,1992
16. If proposal was verbally approved
Name of approver
Date approved
Plugs (measured) 10857 '
Junk (measured)
Cemented Measured depth True vertical depth
Yes 3 O' 30'
Yes 1 934' 1 934'
Yes 11 080' 1 1 080'
Yes 11342' 11 342'
RECEIVED
MAY 2 2 1992
Alaska 0it & Gas Cons, C0mmissi0a
Detailed operation program _&._ BOP sketch
15. Status of well classification as:
Oil Gas _
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~[~/J~-7~--~ Title Area Drilling Engineer
~ - ' .... FOR COMMISSION USE ONLY
Suspended
Date
Conditions of approval: .No~tify Commission so representative may witne~.~
Plug integrityN BOP Test Location clearance .,,~
Mechanical Integrity Test _ -- Subsequent form ~ require
Approved by the order of the Commission
Form 10-403 Rev 06/15/88
,qRtGINAL. SIGNED BY
~ ~,~ i i i"t=l.I
IApproval No.
~-~pproved Cop~ ¢~¢'~ - /'~
10- ~( Returned
Commissioner Date ~ '* ~ j'''' ~ '~
SUBMIT IN TRIPLICATE
SRU 21.15 Well History Summary
SRU 21-15 was completed in June of 1961 in the H2 and H5 sands.
The well was plagued by paraffin and asphaltene and produced at
low oil rates until it died in 1973. Attempts to perform slickline
work in 1974 ended with a fishing job that eventually required
pulling the production tubing to recover a tool string. During that
workover attempts to retrieve the production packer were
unsuccessful and the wellbore was secured with the Hemlock
interval abandoned.
SRU 21-15 Current Well Status
SRU 21-15 is currently plugged with a 25 sx balanced cement plug
set above a packer-fish in the wellbore. Ten sacks were squeezed
away. The top of cement is estimated to be at 10,857' with the top of
the fish at 11,036'.
In October of 1991 the well had 140 psi on it with no pressure on the
surface casing.
SRU 21-15 had produced a total of 1,011 MSTBO.
RECEIVED
UAY 2 2 i99~
,Alaska Oil & Gas Cons. Commisslon
Anchorage
.
.
.
.
.
.
.
.
10.
11.
12.
13.
14.
SRU 21-1/; P&A GENERAL PROCEDURE
Establish injection down the 11-3/4" x 7" annulus. Mix 225 sx (47 bbl)
Class G cement. Pump 27 bbls of cement and displace with 97 bbls of
fresh water followed by 20 bbls cement. Shut in annulus.
R/U CTU. RIH to TD. Tag existing plug. (Tested to 1500 psi on 5/17/92).
Flush well.
RIH w/ CTU to the top of the cement plug. Lay in a 75 sx (17 bbl) cement
plug displace w/ 13.0 ppg mud. Hush CTU. POH.
Install and test 7" casing valve.
RU wireline. RIH w/ BP and set at 3,250'. POH
Perforate the 7" casing from 3,200'-3,205' and 3,070'-3,075'.
Wireline set a 7" cement retainer at 3,140'.
RU CTU. Stab into retainer. Pump 50 sx (10 bbl) cement through
perforations. Unsting from retainer.
Lay in 50 sx (10 BBL) plug on top of retainer. Pressure up on 7" casing
and bradenhead squeeze cement into the perforations.
POH w/ CTU laying in a 200 sx (40 bbl) cement plug to 1,800'. POH to
above TOC and flush CTU. POH.
After WOC, tag cement plug w/ slickline or CTU as appropriate.
CTU set a BP at 300'.
RIH w/ CTU to the top of the bridge plug. Mix 50 sx (11 bbl). POH laying
in cement plug to surface.
Cut off the wellhead. Place P&A marker as per regulations. Clean up
wellsite.
RECEIVED
MAY 2 199
Alaska Oil & Gas Cons. Comnl'tssJot~
Anchorage
Diesel
to 100'
'~"~RU 21-15 P&A
Schematic, May 1992
Current Well Status
Note' All measurements are KB reference
Original GL to KB is 15'
11-3/4" 47# Casing @ 1934'
11-3/4" x 7" Annulus Capacity =
.0699 Bbl/Ft
.3927 Cu. Ft./Ft
I E£EIVED
MAY 2 2 1992
Nas~.0il & 6as Cons.
~chorage
Existing 25 cu ft plug
Top of. Liner
@ 10,856'
TOC @ 10,857'
Top of Fish
@ 11,036'
Perforations
11,139'-11,220'
PBTD @ 11,270'
7" Casing @ 11,080'
Detail: 7", 29#, N80
7", 26#, N80
7", 23#, N80
7", 26#, N80
7", 29#, N80
7", 29#, P110
0-257'
257'-1190'
1190'-4809'
4809'-6663'
6663'-8465'
8465'-11,080'
Capacities:
Wt. Bb[/Ft
23# = .0393
26# = .0382
29# = .0371
Cu. Ft./Ft
.2210
.2148
.2085
5" 20# Casing @ 11,344'
Capacity = .0170 Bbl/Ft
.0954 Cu. Ft./Ft
Cement 300'-Sudace
7" Bridae Plua ('~ 300'
Estimated TOC ~.. 1,800'
13.0
PPg
kill wt
mud
.RU 21-15 P&A
Schematic, May 1992
PrOposed Well
Abandonment
Note: All measurements are KB reference
Original GL to KB is 15'
130 Sx
Perforations 3.070'-3,075'
7" Retainer@ 3,140'
Perforations 3.200'-3,205'
7" Bridae Plua ~ 3.250'
Estimated TOC @ 10,414'
13.0
PPg
kill wt
mUd
11-3/4" 47# Casing @ 1934'
11-3/4" x 7" Annulus Capacity =
.0699 BbVFt
.3927 Cu. Ft./Ft
300 Sx
B3 Zone
B4 3ne
ISqueeze 50 Sx/Z0ne~
RE¢£1VED
M AY ~ 2 199~
Alaska Oil & Gas Cons,
~chorage
Existing 25 cuft plug
7" Bridae Plua (~ 10.831'
-- --
Top of Liner
@ 10,856'
TOC @ 10,857'
Top of Fish
@ 11,036'
Perforations
11,139'-11,220'
PBTD @ 11,270'
7" Casing @ 11,080'
Detail: 7", 29#, N80
7", 26#, N80
7", 23#, N80
7", 26#, N80
7", 29#, N80
7", 29#, P110
0-257'
257'-119O'
119O'-4809'
48O9'-6663'
6663'-8465'
8465'-11,080'
Capacities:
Wt. Bbl/Ft
23# = .0393
26# = .0382
29# = .0371
Cu. Ft./Ft
.2210
.2148
.2085
5" 20# Casing @ 11,344'
Capacity = .0170 Bbl/Ft
.0954 Cu. Ft./Ft
Ilod
I
I
I
I
I
I
I,,,.---'I
I
lc.s.. ' I
~ Imua.? ~1
r.J
I
I
RECEIVED
MAY ~ ~- 199~
Alaska Oil .& Gas Cons. Com~ll'tsslOt~
~chorage
SWANSON RIVER FIELD
STRUCTURE MAP
HEMLOCK FORMATION
1. Type of Request:
Abandon .~
Alter casing _
~ ~' STATE OF ALASKA 0 R I G ~ t-
ALASKA OIL AND GAS CONSERVATION COMMISSION '-~
APPLICATION FOR SUNDRY APPROVALS
Suspend
pairwell
Change approved program _ Pull tubing _ Variance
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
660' FNL, 1980' FWL, Sec 15, T8N, R9W, SM
At top of productive interval
660' FNL, 1980' FWL, Sec 15, T8N, Rgw, SM
At effective depth
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
Operation Shutdown_ Re-enter suspended well _
Plugging _ Time extension _ Stimulate _
Perforate Other x_Abandon
6. Datum elevation (DF or KB)
375' K~
7. Unit or Property name
Swanson River Unit
8. Well number
SRU 21-15
9. Permit number
~'/-/:2_
feet
10. APl number
/..~- /~'1~ ~
11. Field/Pool Swanson River Field
Hemlock Oil Pool
At total depth
660' FNL, 1980' FWL, Sec 15, T8N, R9W, SM-
11,344' feet
11,344' feet
11,344' feet
11,344' feet
12. Present well condition summary
Total Depth: measured
true vertical
Effective depth: measured
true vertical
Plugs (measured) 10857 '
Junk (measured)
11080'
486'
measured
11,220'-11,139'
true vertical
11,220'-11,139'
Length Size Cemented Measured depth True vertical depth
3 0' 2 2" Yes 3 0' 30'
1934' 1 1-3/4" Yes 1934' 1934'
7"
5- 1/2"
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Tubing (size, grade, and measured depth)
Yes 11080' 11080'
YesR ECE l fE,D 11342'
MAR 2 6 1992.
Alaska 0ii .& Gas Cons. Commtssi0n
Anchorage
Packers and SSSV (type and measured depth)
13. Attachments Description summary of proposal X
Wellbore Schematics, Well History, Area Map
14. Estimated date for commencing operation
March 10,1992
16. If proposal was verbally approved
Date approved
Detailed operation program
BOP sketch
15. Status of well classification as:
Oil __ Gas _ Suspended X
Service
Name of approver
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed /~,~ ~'/~/-~/~~FoRTitle COMMISSIoNAroa Drillincj EncjineerusE ONLY
Plug integrity BOP Test_ Location clearance__
Mechanical Integrity Test Subsequent form require 10-
-- Returned
Approved by the order of the Commission ORIGINAL SIGNED BY Commissioner Date ~- ~J - c~.~
Form 10-403 Rev 06/15/88 LONNIE C. SMITH SUBMIT IN TRIPLICATE
SRU 21-15 Well History Summary
SRU 21-15 was completed in June of 1961 in the H2 and H5 sands.
The well was plagued by paraffin and asphaltene and produced at
low oil rates until it died in 1973. Attempts to perform slickline
work in 1974 ended with a fishing job that eventually required
pulling the production tubing to recover a tool string. During that
workover attempts to retrieve the production packer were
unsuccessful and the wellbore was secured with the Hemlock
interval abandoned.
SRU 21-15 Current Well Status
SRU 21-15 is currently plugged with a 25 sx balanced cement plug
set above a packer-fish in the wellbore. Ten sacks were squeezed
away. The top of cement is estimated to be at 10,857' with the top of
the fish at 11,036'.
In October of 1991 the well had 140 psi on it with no pressure on the
surface casing.
SRU 21-15 had produced a total of 1,011 MSTBO.
RECEIVED
MAR ~ 6 199~
Aiaaka Oil & Gas Oons. Oommissio~
Anchorage
·
·
·
.
·
.
.
.
.
.
SRU 21-15 P&A General Procedure
/
Attempt to establish injection down 7" x 11-3/4" annulus·
RU wireline and make GR/JB run to TOL/TOC at +10,856'. POH.
MU bridge plug on wireline. RIH and set same at 10,825'.
POH. RD wireline.
RU CTU and cementers. RIH and set 75 sx balanced cement
plug on top of bridge plug. Estimated TOC at 10,411'.
POH above cement and reverse out any excess cement.
Circulate wellbore to 13.0 ppg kill weight mud. FPOH.
Note: Skip steps 5 and 6 if attempt to inject in step 1 failed.
RU wireline. RIH and set bridge plug at 1944'. POH. RIH and
perforate 5' interval just above bridge plug. POH. RD wireline.
RIH with CTU and lay 150+ sx balanced cement plug on top of
bridge plug. POH above cement. Shut in and attempt to
circulate cement up 7" x 11-3/4" annulus, leaving 300' on top
of bridge plug. Shut in holding adequate pressure on cement to
prevent U-tubing for thickening time plus 2 hours. Release
pressure slowly and POH.
RU wireline and set bridge plug at 300'. POH. Perforate 5'
interval just above bridge plug. POH. RD wireline.
Circulate cement around until good returns to surface. Displace
cement down 10' below wellhead. RD cementers.
Cut off wellhead and place P&A marker as per regulations.
Clean up wellsite.
RECEIVED
I AR ? 6 992
Alaska Oil & Gas Cons. commission
Anchorage
Cement To Surface
7" Bridge Plug @ 300'
Estimated TOC = 1644'
7" Bridge Plug @ 1944'
150+ sx
13.0
PPg
kill wt
mud
150+ sx
13.0
PPg
kill wt
mud
SRU 21-15 P&A
Schematic, March 1992
11-3/4" 47# Casing @ 1934'
11-3/4" x 7" Annulus Capacity =
.0699 Bbl/Ft
.3927 Cu. Ft./Ft
If unable to establish
injection into annulus from
surface, will skip this plug.
Estimated TOC = 10,411'
RECEIVED
MAR 2 6 3992
Alaska 0il & Gas Cons. Commission
Anchorage
7" Bridge Plug @ 10,825'
Top of Liner
@ 10,856'
TOC @ 10,857'
Top of Fish
@ 11,036'
Perforations
11,139'- 11,220'
PBTD @ 11,270'
Detail:
Capacities:
7" Casing @ 11,080'
7", 29#, N80
7", 26#, N80
7", 23#, N80
7", 26#, N80
7", 29#, N80
7", 29#, P110
Wt. Bbl/Ft
23# = .0393
26# = .0382
29# = .0371
5" 20# Casing @ 11,344'
Capacity = .0170 Bbl/Ft
.0954 Cu. Ft./Ft
0-257'
257'-1190'
1190'-4809'
4809'-6663'
6663'-8465'
8465'-11,080'
Cu. Ft./Ft
.2210
.2148
.2085
RECEIVED
MAR 2 6 1992
.Oil .& Bas Cons. commission
;Anchorage
UNIT IIOUNOARY~ ~
, I
! ~14-,o I
PAm. Tm. OeK 1
s~u z~-~5-
_--
I
I
I
I
I
I
1
~FAUI.T ILOGICJ
!
!
!
!
0'
f.-J
I
I
MAR 2 6 1992
Alaska Oil & Gas Cons. commissioo
Anchorage
SWANSON RIVER FIELD
STRUCTURE MAP
HEMLOCK FORMATION
ARCO Alaska, Incl
Post Off;ce Bax 100350
Anchorage. Zias~a 995 t0-0360
Eng:nee,';ng
December 29, 1989
Mr. I. A. Dygas, Branch Chief
Division of Minerals
Bureau of Land Management
6881 Abbott Loop Road
Anchorage, Alaska 99507
Dear Mr. Dygas:
Attached is a Sundry Notice requesting approval to temporarily abandon 31 wells
in the Swanson River Field for a period of 12 months. This sundry is being
submitted to comply with Chapter II, Sec. 3162.3-4, paragraph C of the Bureau
of Land Management Regulations. All 31 wells are expected to be shut-in for a
period of at least 30 days. The wells are separated into four categories:
1. Under evaluation for rote potential.
2. Under evaluation for P&A or future utility.
3. Inefficient producers.
4. Shut-in until blowdown.
Several other items have been attached for your information. Brief explanations
are given for each well that has been added or deleted from the temporarily
abandoned stares (Ref: your letters of 3/1/89 (3160 (984)) and 3/30/89 (3180
(984)) and our letter 12/28/88). In addition, a list of currently shut-in wells
which have planned upcoming work that will enable their remm to production is
attached.
If you have any questions concerning this Sundry Notice request, please call
Stacy Strickland at 263-4914.
Sincerely,
Tom Wellman
TW:SLS:jt:0016
Attachment
cc: -C. V. Chatterton, Chairman AOGCC
A. R. Kukla, Marathon Oil Company
S.W. Ohnimus, UNOCAL Corporation
RECEIVED
Alaska Oil & Gas Cons. C0mmissiQ
Anchorage
Form 3160-5
(Noveml0er 1983)
(Fonnerty 9--331)
BUREAU OF LAND MANAGEMENT
SUNDRY NOTIC~ AND R[~R~ ON
1
~ITED STATES
DEPARTMENT OF THE INTERIOR
Nd, Ill 01' oPIUTOI
ARCO Alaska, Inc.
3. ADDI~SI Of OIHBB~TOIt
Post Off fce Box 100360 Anchroaqe, AK 99510
14. Pllldl~* NO.
Form apprQvecL
13udder flumeu No. lOC?.: 0135
Exl)trea Aull~at 31. lc)ss
?. UID iGUIMi#! NAMI
oldotnaCreekAwanson ~lver units
g. W'~J-L
10. fl,ILO &HD POOL, OS WILDC&~
I
Kena i
Alaska
16.
Check Apotoortate Box To Indicate Nature ot Notice, Redo,t, or Other
NO~IcB ~f INTIN~ON ~:
REPAII WILL J J CHANGB Pi&N8
(Other) ~empoPs~J Jy abandon ,
27. ue, scRfn£ f.noPosio OB COMPLETEO OPERA'~IO.~S (Clearly state ill ~rtlnent detalia, and ;lye ~rtlnent ht~ Inelud~ a~ltd h~ of ~ e~
;ro~s~ work If w~ b dietary d~U~ five ~m ~un8 and mellUr~ and t~e vertt~ ~p~ t~ ~ ma~eu ~ mn~ ~m-
nenG ~o ~M ~rL) *
As described in-thc attached memo, ARCO Alaska, .Inc. requests that thc
following wells have a temporarily abandoned status:
Soldotna Creek Unit
Swanson River Unit
SCU 13-3
SCU 13-4
SCU 21A-4
SCU 34-4
SCU 24-5
SCU 33-5
SCU 33-8
SCU 341-8
SCU 34-9
SCU 31A-16
SCU 14-34
SRU 34-10 SRU 23-22
SRU 14-15 SRU 312-22
SRU 21-15 SRU 23-27
SRU 211-15 SRU 314-27
SRU 331-27
SRU 31-15 SRU 34-28
SRU 34-15 SRU 43-28
SRU 41A-15 SRU 14A-33
SRU 43A-15 SRU 24-33
SRU 32-33WD
SRU 432-15 SRU 12-34
RECEIVEE
D o29L089
Alaska 0ii & Gas Cons. Commi~.
Anchorage
18. [ bereOy certify t. hat t~e fore,aLs4 ts tf~ae and Correct
TZTZ~ Cook Inlet Enginerring Managu~B
(Thio apace for lr~d~rai o~ State o~ee
APPROVED BT
CONDITIONS OP APPHOVAL. La* ANY:
DA~'l
*Se~ Insm,cflom on Remu Side
Title tS U.S.C. Section 100l, makes it a crime [or any person knowmgiy and willfully to make co any department or a~enc¥ o[ the
United States any false, ~ict[tlous or fraudulent statements or representi~ons as to any matter wttht~ Its ~urisdiccio~
TEMPORARILY ABANDONED WELLS IN SRF
Wells under
Evaluation
Rate Potential
Wells being
evaluated for
P&A/Future Utility
Wells SI
for Inefficient
Production
Wells SI
until
Blowdown
13-4
34-4
24-5
33-8
341-8
34-9
41A-15
23-22
23-27
13-3
14-15
21-15
211-15
31-15
34-15
432-15
31A-16
312-22
34-28
14A-33
32-33WD
12-34
14-34
21A-4
33-5
34-10
43-28
24-33
43A-15
314-27
331-27
For: Temporarily Abandonment
of 12/29/89
SWANSON RIVER FIELD
Wells having Changed Temporarily Abandoned Status
Added to Temoorarilv Abandoned Status:
SCU 21A-4: Well is temporarily abandoned due to inefficient
production (high GOR).
SRU 32-33 W D: Well is temporarily abandoned due to annulus
communication problems.
Removed from Temporarily Abandoned Status:
$CU 243:8:
production.
This shallow sands gas well has been returned
S, CU 13-9: A workover is planned for this well which will enable
this well to be returned to an active status.
.S,.RU 212-10: This shallow sands gas well has been returned to
production.
SRU 23-15: This gas-lifted well has been returned to production.
SRU 21-34: A sidetrack is planned which will enable this well to be
returned to an active status.
RECEIVED
D c2 1989
Alaska 0il & Gas Cons. Commissiot~
Anchorage
For: Temporary Abandonment Sundry
of 12/29/89
SWANSON RIVER FIELD
WELL STATUS UPDATE
Shut-in Wells with Planned Upcoming Work*
$CU 32A-9.: When on-line, this SI well produces gravel. A sidetrack
is planned to return this well to active status.
*Will not be placed on temporarily abandoned
O~c 2 91989
~aska Oil & ~a~ Cons.
AnChorage Commissioo
For: Temporary Abandonment Sundry
of 12/29/89
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
Cook Inlet/New Ventures
Engineering
August 19, 1987
Joseph A. Dygas, Branch Chief
United States Bureau of Land Management
Post Office Box 230071
Anchorage, Alaska 99523
Dear Joseph:
Attached is a Sundry Notice requesting approval to temporarily abandon 39
wells in the Swanson River Field fora period of 12 months. This sundry is
being submitted to comply with Chapter II, Sec. 3162.4, paragraph C of the
Bureau of Land Management Regulations. All 39 of the wells mentioned in the
attached Sundry Notice are expected to be shut-in for a period of at least 30
days.
The 39 wells listed in Table #1 were identified during our recent review of
the status of all wells in the Swanson River Field. These wells have been
put into four categories:
1. Evaluate for rate potential
2. Evaluate for plug and abandon/future utility
3. Shut in - inefficient production
4. Shut in - save for blowdown
Wells. in Categories #1 and #2 are currently-under evaluation to determine
their final disposition. Wells in Categories #3 and #4 are wells with little
short-term usefulness, but wells that do have some long-term utility.
If you have any questions about this .Sundry Notice request, please contact me
at 263-4299.
Sincerely,
H, F. Blacker
Regional Engineer
Cook Inlet/New Ventures
HFB' JWR: ch' 0006
Attachment
CC:
C. V. Chatterton, Chairman
Alaska Oil & Gas Conservation Com~aission
Form 3160--5
(November 1983)
(Formerly 9--331)
UNITED STATES
(Other Instructions on re-
DEPARTMENT OF THE INTERIOR versedde)
BUREAU OF LAND MANAGEMENT
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not ~se this form for proposals to drUi or to deepen or plug bask to · different reservoir.
Use "APP./CATION FOR PERMIT~" for such
Git, ~ GAS ~
WELL waLL oTHER
NAME Or OPERATOR
ARCO Alaska, Inc.
3. ADDRESS Or OPBIATOR
P. O. Box 100360 Anchorage. AK 995]0-~60
4. LOCATION oP %%'Er.L (Report location clearly and I'~ a~cordance with any State r~alrements, e
See also 8pace 17 below.)
Soldotn~
At 8q.ffaee
Soldotna Creek Unit - 15
Swanson River Unit - 22 wells
Form approved.
Budget Bureau No. 1004-0135
Expires, August 31, 1985
AND filiAL MO.
~. !~ IMDIAJl, ALL4YI~TIBB OB TtlBl NAMB
7. UNI~ AORBIIMIIMT NAMm
Creek/Swanson River Unit
8. IsA]BM OR LBAaB IIAMm
0. W-ue'~- MO.
10. IslmLD AND POSts OR WILDCAT
Swanson River Field
14. PSBbIIT NO.
jIS. ELIVATIONS (Show whether Dr, er. ~. ets.)
11. SEe. ~t., L, M., OB BLK. LWD
IUIVB! Git mA
~ena:i. I Alaska
l(J.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
.o..c. 0...T.aT.o- TO: .U.S.,U"'' ...O.. O.:
FRACTURs~ TREAT MULTIPLB COMPI.ETE rBAc'ruuB TRBATMml(~* . Ar-dA~IRIJlO
S~OOT Om ACXD~B ABaNDOn° se~l~O OB ACID~I~O
REPAIR W~LL CHANGE PLANS (Other)
(N~I: Re~rt r~ulm of m~tlple ~mpleflon on W~
(Other) T~mporarily abandon .~ Completion or R~mpletion Re,ri and ~g fem.)
DES~RIUE f'ROPOSED OR COMPLETED OPERATIO~ (Clenrl~ state nil pertlne,t details, and give ~rtinent date~ Ineludl~ ~fimat~ dt~ of
proposed work. If w~l b di~tion~y driH~, five s~e I~Uuns end meaour~ and true vertJ~ dept~ for ~1 markers and Mn~ ~rU-
neat ~ ~is worL) ·
As desc:~bed ~n ~he attached memo, ~C0 A~aska, ~nc. :squeals the status o~
fo[~ow~ng we~s be changed to Tempo:a:~ Abandoned.
SOLDOTNA CREEK UNIT
SWANSON'RIVER UNIT
SCU 13-3 SCU243-8 SRU212-10
SCU12A-4 SCU 13-9 SRU 34-10
SCU 13-4 SCU12A-10 SRU 14-15
SCU323-4 SCU343-33 SRU 21-15
SCU43A-4 SCU 14-34 SRU 31-15
SCU 24-5 SCU 14-3 SRU 432-15
SCU 33-5 SCU23B-3 SRU 34-15
SCU341-8 SCU 34-4 SRU41A-15
SCU21A-4 SRU43A-15
SRU312-22
SRU 21-22
SRU 23-22
SRU 22-23WD
SRU212-27
SRU314-27
SRU 23-27
SRU331-27
SRU 34-28
SRU14A-33
SRU 24-33
SRU 12-34
SRU 21-34
18. [ hereby certU*~Z~_tlLat the for. swains i~/'~ae and correct
TITLE Regional Engineer
(This spree for Federtl or State of~ee use)
APPROVED BT
CONDITION8 OF APPROVAL, I~' ~:
TITLE
DAT~
*See I.~uction, on Revere Side
Title 18 U.S.C. Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the
..... e .......... ,_,__ ::.,-. ........ ¢,-m,,rl,,lp,~e etnt,amamte mr r~r~qPntetif~r~ aR to allY matter within its jurisdiction.
TABLE
Wel 1 s under
Evaluation for
Rate Potential
41A-15
23-22
23-27
34-28
21-34
323-4
13-9
341-8
24-5
13-3
13-4
23B-3
14-3
33-5
34-4
Wells being
Evaluated for
P&A/Future Uti 1,,i,ty
212-10
21-15
31-15
34-15
432-15
312-22
212-27
14A-33
12-34
22-23WD
243-8
14-34
Wells SI
for Inefficient
Production
12A-4
43A-4
24-33
12A-10
34-10
14-15
21-22
21A-4
Wells SI
until
B1 owdown
43A-15
314-27
331-27
343-33
~'~HEVRON- U.S.A. IN.~',~
TRANSMITTAL AND ACKNOWLEDGEMENT OF RECEIPT OF MATERIAL - (ALASKA)
DEPT.: FD - Folded
· ' R - Rolled
PLACE: S - Sepia
,.
F - Film
ATT: X ' - Xerox
. B - Blueline
THE FOLLOWING IS A LIST OF MATERIAL ENCLOSED HEREIN. PLEASE CHECK AND ADVISE IMMEDIATELY.
RECEIVED BY
'--'-- Naska Oii& Ga; Ce.,.s_f,.~mis io~a.~
Anchorage
COMPLETION REPORT - REMEDIAL WELL
AREA: Swanson River Field
LAND OFFICE: Anchorage
PROPERTY: Swanson River Unit
LEASE NO: A-028406
WELL NO: SRU 21-15
LOCATION AT SURFACE: 656' S & 1976' E from the N.W. Cor., Section 13, T8N, R9W, S.M.
ELEVATION: 335' K.B.
DATE: 3/83
AREA SUPERVISOR
DRILLED BY: Brinkerhoff Signal Company, Rig #60
.o
DATE COMMENCED REMEDIAL WORK: 12/4/79
DATE COMPLETED REMEDIAL WORK: 12/14/79
RETURNED TO PRODUCTION: Suspended
RECEIVED
MAY ! 8 ! 83
TOTAL DEPTH: 11,344 '
EFFECTIVE DEPTH: 10,857' (cmt)
NaSka 0tl & Gas Cons. Commission
Anchorage
SUMMARY
PLUGS: 10,857' - 11,035'
11,270' - 11,344'
CASING: 22" at 30'
11 3/4" at 1,934'
7" at 11,080'
5%"'10,856' - 11,342'
FISH: 2 7/8" tubing 11,036' - 11,220'
PERFORATIONS: 4%" HPF 11,133' W.S.D.; 4% HPF 11,220' - 11,139' (Abandoned)
· 121~ - 1215179
Accepted rig at 12:00 noon.* Nippled up tree and killed well by pumping +450 bbls.
of 65 PCF mud down the tubing. Set casasco plug. Nippled down tree. Nippled up
BOPE.
12/~;/7~ 65 PCF
Could not remove 3~/2" pipe ram blocks due to damage sustained earlier. Removed
hydril and forced ears down to remove 3~/2'' blocks. Replaced hydril and installed 2
7/8" pipe ram blocks. Total down time 9~ hours. Tested Class !11 BOPE to 5,000
psi. (Sot returns after reverse circulating +70 bbls. mud down annulus. Rigged up
Dresser-Atlas to cut tubing. Found top of junk at 10,788' (+100' of .092 wire). Cut
tubing at 10,773'. Pulled one joint of 2 7/8" tubing. Rigged~own Dresser-Atlas.
12/7/79- 12/8/79
Pulled +10,773' of 2 7/8" tubing. Changed pipe rams to 3~/2''. Ran in hole with
5 3/4" ~-ollow mill and 5 3/4" overshot and milled over flared tubing stub and
engaged fish. Pulled 5,000t/ over string weight and rotated. Lost torque after 12
turns, Re-engaged fish and repeated procedure. Pulled out of hole with no
recovery. Ran in hole with redressed overshot. Engaged fish and pulled +!00,0001!
over string weight and rotated 12 turns. Backed out 9 turns of torque. Repeated
procedure three times, Fish disengaged on fourth attempt. Pulled out of hole.
12/9/79 65 PCF
Ran in hole with 2 3/4" grapple. Would not hold fish while rotating. Ran in hole
with overshot with extension. Engaged fish. Fish disengaged while rotating. Ran
in hole with overshot and extension to engage 2 7/8" x 2 3J8" X-O. Jarred on fish
and rotated.
! 2J 10/79 ~;~ PCF
Continued to jar and rotate fish. Pulled fish free 30' up hole where it became
stuck. Continued to jar and rotate. The 2 3/8" tubing parted 20' above mandrel.
Recovered 6 I/3 joints of plugged 2 3/8" tubing, XO and 2 7/8" tubing stub. Ran in
hole with 4~/4 overshot and engaged top of fish at 10,939'. Jarred fish up hole.
Freed fish enough to pull without jarring. Recovered one joint of 2 3/8" tubing and
CC joint.
! 2/! 1/79 ~;~ PCF
Ran in hole with 4'/z" x 3~/4" mill shoe on wash pipe. Could not get past 10,992'.
Milled to 10,995' (5Y2" liner cut or split 10,992'- 10,995'). Milled to 11,036' and
found CC joint indicating packer had moved up hole in previous fishing atempts.
Rotated over CC joint and 2 3J8" tubing to top of packer at 11,046'. Milled over
packer I ft.J6 hfs. Pulled out of hole with dull mill.
12/12/79
Ran in hole with mill shoe and engaged CC joint. Unable to rotate into packer.
Jarred on fish. Pulled out of hole with mill shoe and recovered bent 6" x 2" piece
of 2 3/8" tubing, continued to mill without success. Pulled out of hole.
12113179- 12/1~/79
65 PCF
Ran in hole with CC retrieving tool and jarred on packer without success. Pulled
out of hole. Abandoned Hemlock by spotting a 25 C.F. Class "G" cement plug at
11,035'. Bradenhead squeezed 10 C.F. Class "G" cement (top of cement at 10,857').
Filled top 100' of hole with diesel. Nippled up tree.
COMPLETION REPORT - REMEDIAL WELL
AREA: SWanson River Field
LAND OFFICE: Anchorage
PROPERTY: Swanson River Unit
WELL NO: SRU 21-15
LEASE NO: A-028406
LOCATION AT SURFACE: 656' S & 1976' E from the N.W. Cor., Section 13, T8N, R9W, S.M.
ELEVATION: 335' K.B.
DATE: 3/83 BY: ~~.' ..... ~ ~
m~A SUPERWSOR
DRILLED BY: Brinkerhoff Signal Company, Rig ~60
·
..
DATE COMMENCED REMEDIAL WORK: 12/4/79
DATE COMPLETED REMEDIAL WORK: 12/14/79
RETURNED TO PRODUCTION: Suspended
SUMMARY
TOTAL DEPTH: 11,344'
EFFECTIVE DEPTH: 10,857' (cmt)
PLUGS: 10,857'
11,270'
CASING: 22" at 30' FISH: 2 7/8" tubing 11,036' - 11,220'
11 3/4" at 1,934'
7" at 11,080' ·
5%"'10,856' - 11,342' '
·
:
·
PERFORATIONS: 4%" HPF 11,133' W.S.~.; 4% HPF 11,220' - 11,139' (Abandoned)
'121Zl. - 1215179 :
Accepted rig at 12:00 noon.* Nippled up tree and killed well by pumping +450 bbls.
of ~;5 PCF mud down the tubing. Set casasco plug. Nippled down tree. Iqippled up
BOPE.
12/617z~ 65 PCF
Could not remove 3Y2" pipe ram blocks due to damage sustained earlier. Removed
hydril and forced ears down to remove 35" blocks. Replaced hydril and installed 2
7/8" pipe rom blocks. Total down time 9'b hours. Tested Class III BOPE to 5,000
psi. Got returns after reverse circulating +70 bbls. mud down annulus. Rigged up
Dresser-Atlas to cut tubing. Found top of junk at 10,788' (+ 100' of .092 wire). Cut
tubing at 10,773'. Pulled one joint of 2 7/8" tubing. Rigged~own Dresser-Atlas.
1217179- 1218179
Pulled +10,773' of 2 7/8" tubing. Changed pipe rams to 3~". Ran in hole with
5 3/4" ~ollow mill and 5 3/4" overshot and milled over flared tubing stub and
engaged fish. Pulled 5,00011 over string weight and rotated, Lost torque after 12
turns. Re-engaged fish and repeated procedure, Pulled out of hole with no
recovery. Ran in hole with redressed overshot. Engaged fish and pulled +100,000t!
over string weight and rotated 12 turns. Backed out 9 turns of torque, Repeated
procedure three times. Fish disengaged on fourth attempt, Pulled out of hole.
1219179 ~;5 PCF
Ran in hole with 2 3/4" grapple. Would not hold fish while rotating. Ran in hole
with overshot with extension. Engaged fish. Fish disengaged while rotating, Ran
in hole with overshot and extension to engage 2 7/8" x 2 3/8" X-O. Jarred on fish
and rotated.
12/~0/79 66 PCF
Continued to jar and rotate fish. Pulled fish free 30' up hole where it became
stuck. Continued to jar and rotate..The 2 3/8" tubing parted 20' above mandrel,
Recovered 6 I/3 joints of plugged 2 3/8" tubing, XO and 2 7/8" tubing stub, Ran in
hole with 4~4 overshot, and engaged top of fish at 10,939'. Jarred fish up hole.
Freed fish enough to pull without jarring. Recovered one joint of 2 3/8" tubing and
CC joint.
..
12/I 1/79 66 PCF
Ran in hole with 4'b" x 31f4" mill shoe on wash pipe. Could not get past 10,992'.
Milled to 10,995' (55" liner cut or split 10,992' - 10,9959. Milled to 11,036' and
found CC joint indicating packer had moved up hole in previous fishing atempts.
Rotated over CC joint and 2 3/8" tubing to top of packer at 11,046'. Milled over
packer I ft.~6 hrs. Pulled out of hole with dull mill.
12112/79
·
·
Ran in hole with mill shoe and engaged CC joint. Unable to rotate into packer,
Jarred on fish, Pulled out of hole with mill shoe and recovered bent ~;" x 2" piece
of 2 3/8" tubing, continued to mill without success. Pulled out of hole.
12/13/79- 12/IZ1./79
65 PCF
Ran in.hole with CC retrieving tool and jarred on packer without success. Pulled ._ ~L.:.:~:~...-:. -.::
' Il II
out of'hole. Abandoned Hemlock by spothng a 25 C.F..Class G cement plug at
. .~,~ .. ~ -.,~.:.~
' ' I 1,035'. Bradenhead squeezed 10 C.F. Class "G" cement (top of cement at 10,8579. .
-.~'i.i.'. :,:,:.: .-Filled tod 100' of hole with diesel. Nippled up tree. - .. . -,... . ;.'?-;.~-:,';t
Form 10-40~
RE~' i-i 0-7~3
Submit '1 ntentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
4. LOCATION OF WELL
Atsu.ace 656' south and 1,976' east. from nort.hwest,
corner of Sec. 15.
5. APl NUMERICAL CODE
1 33-10139-00
WELL i i OTHER
2. NAME OF OPERATOR 8. UNIT, FARM OR LEASE NAME
GHEVRON U.S.A. INC. SWANSON RIVER UNIT
3. ADDRESS OF OPERATOR 9. WELL NO.
P. 0. Box 7-839 Anchorage, AK 99510 SRU 21-15
10. FIELD AND POOL, OR WILDCAT
Swanson River- Hemlock
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
335' KB
Check Appropriate Box To Indicate Nature of Notice, Re
NOTICE OF INTENTION TO:
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
14.
6. LEASE DESIGNATION AND SERIAL NO.
A-028406
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 15, T8N, R9W, SB&M.
12. PERMIT NO.
)crt, or Other Data
SUBSEQUENT REPORT OF.'
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other) ,,
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and gi~'e pertinent dates, including estimated date of
starting any proposed work.
l. Kill well wit,h 66-68 PCF drilling fluid.
2. Install Class III B.0.P.E. (See attached). Test to 5,000 PSI.
3. Recover and repair production tubing.
4. Rerun tubing with packer to be set, above production perforations.
5. Return well to production.
RECEIVED
ONSHORE DIST, OFFICE
J~JG 20 1979
36. I hereby certify that the foregoing is true and correct
e fo -State offi use'
(This spec r jte_~ ~
c%"..,%% %?. '' .'-'. o .w,
Area Engineer DATE
DATE
See Instructions On Reverse Side
Approved
C
· .
..
,F",~ ~" ADAPTOte " '
~'Al,'O ,Y"- 6-000~' A'.4L
0.. 2" SCFT£1,V£D BULL PL ZIG .Ylj ,/,//z" O' ~'~ ~ i0;' X.- OYZ'/e ,.SPOOL .5'000~ ._ OUTL E T_Z4/J~'O00~A A'~-ROT~ST' ~
~ THO '2"'-,5-O00~YAzY~',5'. ....... 0 SA/',4FF~R HYDA=~ULIC TYP~' ''
:'-" -' ' ....................... '- .L PYS /0"-,5'0007. DBL..P, eEVENTER, i
.~ GHAFFZ-R' TZ?G. //of. P//f Z-a~-.FO00~ H)/zg,e// 7'YPE ~/(" /0"-.~'0o0~.
.FZ,~NG~".~ . OUT'ETS." ' .~LO~I/OUT PR.~"VENT-.~-~ .........
t.
,o" '.C .':,i-'
·
]®
''- I I£"- 3'000~
f
,.,
SWANSON RIVER FIELD
WELL HEAD HOOK-UP
CLASS ZE B. OPE.
$. C.U. 21 - 1.5
..
) ACKNO~rLEI)(JI'?IENT ()F Ri'J(;l']J I/T O. A'I I';R ! AI, -
FD - Fo].d(:d
R - Roll. cd
S - Scl)ia
F - Film
- Xerox
B - Blueline
THE FOLLOWING IS A LIST OF bD%TERIt~L ENCLOSED HEREIN. PLEASE CHECK AND ADVISE.. IMMEDIATELY .
COPfPANY
WELL
ItlSTORY LOG 2" 5" ! [
I00 200
,t *t ti
I t
....
'mu /4-3
_., ~c~ ~/4-,5 ....
RECEIVED BY
Rock S -82901
Area Code 307
Tel. 362-6488
prOducing Formation
Elevation (CHF, DF, KB, etc.)
- Datum.- sttbsea, or
.
Tubing set at
,' caSing set at
"Production Packer at
ii ~ ~Perf°rati°ns
Subsurface Controls (Nipples, etc,)
~ _.
Instrument Data
i-'C0mpany Running Survey
.:.:~ Element - Range& No.
:Clock- Range & No.
;_ Calibration Date
-('*i;i2 Static Pressure Data
Pressure at Datum. ~. ..... ~-- -
Pi at Datum ,
-~;~' Shut-in Tubing Pressure' -' 93,.5
_Shut-in Casing -Pressure:
TOp of .Water .-
Temperature-at-i' 't 0835- feet. ~ 79
·
Date of Last,T~st ' '"
Pressure ~ Datum, Last Test
;" Shut-in Time, Last Test
FloW .Test Data-
Choke Size
Period of Stabilized Flow
· Stabilized Production
Oil
Gas
Water
Flowing Tubing Pressure
Flowing Casing Pressure
.
Remarks'
C. A. White
Wire Line Well Service
Box 156 Casper, Wyoming 82601
SUBSURFACE PRESSURE SURVEY
( )
C. A. White
K2 9280 6000psi
3 Hr.
A~ril !6,.I97~
psig
psig
psig
oF
psig
in
hrs
bbls/day
MCF/day
' bbls/day
psig
psig
Operator._ N o C-to. Hopper
Box 962
Soldotna, Alaska 99669
Area Code 913
Tel. 262-4496
Company Standn_rd 0q_2 Company
Lease gRU Well No. 2 ~_ - ! 5
Field ~WaD$O_m_ ~i?e~ ... State Alaska
Test Date /~r,'~ 3 1 ~.1 {D~
Zero Point KB GRD
Time
Press.,
P, psig
lOO5
lO66
1114
1159
1207
1216
1263
1332
1413
Static Test
Press.
At
hrs.
Tul
Pr~
;
..
:
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
i i i ii iii
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
~.T~Eo~w~- o.. ~ ~s ~ "~ "
W ELL W g LL DR V Other
b. TYPE OF COMPLE~ON:
WELl, OVER EN BACK RESVR. Other __~
SUBMIT IN gU .... ATE*
( Sep other In-
st ructioiqs on
reverse side.~
NAME OF OPERATOR
ADDRESS OF OPERATOR
4. LOC^T~ON OF wELL (Report location clearly and in accordance with amy State requirements)*
At surface
At top prod. interval reported below
At total depth
5. APl N~CAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN, J~LLOTTEE OR TRIBE NAiVLE
8. UNIT,FAA2AVI OR LF~kSE NAME
9. WELL NO.
10. FIELD AND POOL, OR W1LDCiT
11. SEC., T., R., M., (BOTTOM HOLE
Of MECTIVE)
12. PEI~MIT ?,TO,
PLUG, B2~CK "
I:[OW~La--NY* ROTARY TOOLS CABI,E TO01,S
PRODUCING INTERVAL(S), OF THIS CO1ViPLETIO~I--TOP, BOTTOM, i~AME (MD AND TV'D)', 23. WAS DIRECTIONAL
' SURVEY MADE
1
Tx~PE EI-~CTRIC AND OTHF.~ I,OG$ RUBt
Ill I -- I iii
'7~' : CASING RECORD (Report all strings set in well)
ii i i i ii ] i i iiii ii i i
~. ~ ~co~,
28. PERFORATIONS OP~ TO PRODU~ON (interval, size and number) 29. 'ACID,St OT ~ A X uRW C~',IENT ~TC I I
30. PRODUCTION
.~ ~ODUCTION ~EI[{O'D (Flowh]Z, gas lif~, p~mpk~g--size and type of pump', ~V/ELL STATUS (Producing
DATE FIRS~ PI%ODUCTION or
" ' ~OUES q ~OD':q ~0,~ '
DATE OF TruST, ] -'EST~ ~CI-!OICE SIZE OI~EDL. GzL~CF. VTATE~BBL. GAS-OIL
II.%rIO
l
FL~V,!~SS.~TBING ]]CAS~G PRESSURE ~24-HOuR.CAL~T~RA~ 'OI~BBL, GA~-?~C~. WA~BBL. ]OIL GRAVITY-~I (CORR.)
31. DISPOSITION OF OAS (Sold, used for fuel, vented, etc.)
......
32. LIST 0F ATTACHMENTS
33. I herebY- certify that the foregoing and attached information l~ complete and correct a~ determined from all-avMlable rec6rds
SIGNED
BI~ ~-~'~ TITLE
- ·
· (See Instructions and Spaces for Additional Data on Reverse Side)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report end log on
all types of lanJs and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
ments given in cther spaces on this form and in any attachments.
Items 20, and 22:: If this well is completed for separate production from more than one interval zone
(multiple completion), so state in item 20, and in item 22 show the prc-Jucir~.g intCrv01, or intervals,
top(s), bottom(s) and name (s) (if any) for only the intervJI reported in item 30. Submit a sep0rate report
(page) on this form, adequately identified, for each additional interval to be seperately produce, J, show-
ing the ~cf'ditional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing anc~ the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
34, SUMMARY Ole F'ORMATION TES'I'.S IN('I,UI)IN(; INTERVAL TF~S'FED, PI1E.~iSUR£ DATA A.N'D ~.F__~OVlC~RIES OF OIL. GAS.
WAT~Irl AND MUD
36. COI1~ DATA. A'1'I~ACII
A.ND .DE'r~-C'rED SUOWS
35.
NAME
G ]DOLOG IC M A 1R KI~R~
COMPLETION .RF~ORT - P~.CI~R A~D GAS LLFT .,.,,STALLA~IOE
STANDARD OIL CO~V~A~.~~ OF CALIFO~d'!L~..~ WESTERN OP~ATIONS~ .INC. ~ Operator
J~REA: Kenai Peninsula, Oook Inle~ Ares, Alaska LAN~ OFFICE: Anchorage
Lease No. ~ A-028406
PROPERS: Sw~so~ ~ver U~.t
$~ N0.: SRU 21-15 Section ~5 T. 8. N.~ R. 9 W.~ Seward B & M
LOCATION: Surf~c~: 6~' South ~ 1~6' East f~m No~nwest co,er of Section lS.
E~ATION: 3S$' E. B~ K.B. ~s ~.5' above ~und
TOTAL DEPTH: II~ 3~'
CASING:
22" cemenbed at SO.;..
11 3/k" cemented at 19~1~'
7" cemented at iX,~'
5 i/~" cemented at 11,3~2' _~ rep St 10,856'
COMPLETION REPORT - PACKER AND GAS LIFT INSTALLATION
~$WANSON RIVER I~IT 21-15
Section 15. T. 8 N.,. R. 9 W., Seward B & N
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS,
INC. - Operator-
Commenced rigging up at 9:00AM. Conditioned Black M~gic Mud.
January 23~, 1~6~
Conditioned mud and killed well.
January 2.4.~ 1963_
Removed x-mas tree, installed BOPE and pulled tubing loose· Ran to ll, 210' with
tubing before pulling out of hole. Ran casing scraper and cleaned out to 11,270'
Circulate~.
January 25, ,..1963
Pulled casing scraper.
8 R rg 2 tubing equipped with packer and mandrels.
TUBING DETAIL
K.B. to landing head
Donut
Two 2 7/8" pup joints
46 joints 2 7/8" tubing
Camco MM Mandrel w/RD (~l)
46 joints 2 7/8" tubing
Camco MM Mandrel
40 Joints 2 7/8"
Camco MM Mandrel
33 Joints 2 7/8"
Camco MM~ Mandrel
30 joints 2 7/8"
Camco MM Mandrel
26 Joints 2 7/8"
tubing
w/~ (~)
tubing
tubing
~/~ (~)
tubing
Camco MM Mandrel w/RD (~6)
22 joints 2 7/8 tubing
Camco MM Mandrel w/RD (~7)
63 Joints 2 7/8" tubing
Camco MM Mandrel w/RD .(~8)
32 Joints 2 7/8" tubing
2 7/8" X 2 3/8" crossover
7 joints 2 3/8" tubing
Camco MM Mandrel w/CEV (~9)
I joint 2 3/8" tubing
Brown CC Safety joint
One 2 3/8". pup joint '
Brown 2 3/8" X 5½" ~S-16-1 packer
2 joints 2 3/8" tubing
Camco "D" ~pple
3 joints 2 3/8" tubing
Venturi Shoe
Reran 351 joints of 2 3/8", ~.7~ and 2 7/8", 6.5~ N-80 EUE
K.B. Depth
15.00'
· 72' 15.72'
9.75'
l~53.26' 1~78.73'
13.04' lg91.77'
1424.39' 2916.16'
13.18' 2929.3~'
1266.27' 4195.61'
13.13' ~2o8.7~'
104~. 46 ' 5253.20 '
13.20' 5266.~0'
949-55' 6215.95'
13.07' 6229.02'
822.3~' 7O5l. 4l,
13.14' 7064.55'
695.65' 7760.20'
13.17' 7773.37'
1993.09' 9766.46'
13.11' 9779.57'
1011.77': 10~ 791.34'
1.11' 10,792.45'
213.8o' ll, 006.25'
13.10' 11,019.35'
31,48' ll, 050.83 '
· 97' 11,051.80
lO.15' 11,061.95'
3.96' 11,065.91'
61.59" 1l, 127.50'
· 92 ' 11,128.42 '
90.57' 11,218.99'
11, 219.58'
Tubing landed at 11, 219 ~-58'
Removed BOPE, reinstalled x-mas tree and displaced mud with oil.
January 26, 1963
Set packer'at '1i"062' and returned well to production. Rig Released at 7:00A~.
S.R. NANSEN
sat
WELL RECORD INVENTORY
Fi e 1 d: ..... _S_~ea~so_n R~ve_r ........
Loca ti on
.,
Operator & Well Names -. .... n~d(x~d oil Comoa~y
Swa~sgn '~ver, O,nit ~;21-15
1. Drilling Pemit:
No. Pages
2
2. Survey Plat:
3. Monthly Reports (P-3):
4. Completion Report (P-7):'
o
5. Well History:
6. Other:
7. Mi s cel 1 aneous:
8. Deviation Survey(s):
9. Well Logs: '_(_]) _ TEn
(2) SL
Total Pages:
NONE
1
_(_3). CD
(4)_ CBL-2
(5) ....
_(8)
(9)
.... ii ii L i im ii
(_1o) ,
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
LESSEE'S MONTHLY REPORT OF OPERATIONS
~e followi:~ is a correct repor~ of operations (~nd prod~cLio~ fiizcludin~ Jrillin,~ and prodtzcin,~
..
..... ..................................................
9w
RAritY ~I~ th~u~'.ds) tlS(:OVll~I~ nm:e, So
i i !January 22t 1963.
Kliali w~rE ccam~nced
.~A RgEI~5 OF
W,wza (L'
state)
REMARK8
(If driHtog, depth; if Mint down, ~u~;
date ~.~ld r~ult ~[ t~t for
c~tent oF
Pulled ~ubing.
,h paeke~ and
,roducti~.
Noa'e.--There were ........................................ runs or sales of oil; ........................................... M cu. ft. of gas sold;
..;~ ........................................ run~ or s~les of g~soline ~during the month. (Write "no" where 8pplic~ble,) .
· N°~.~Repor~ on this form is mqu~ for ~eh ~f~n~,r month, ~g~rdless of the stat~ of operations, ~nd muet bo fil~ In
.du~i~tewith the su~rv~ by the 6th of the sue~e~g mouth, u~ otherwise directed by the supervisor.
P. O. BOX 7-839 ° ANCHORAGE ° ALASKA
PRODUCING DEPARTMENT
T~LEP.ONEE.. 7--.20. August ]0, 1961
C. V. CHATTERTON
DISTRICT SUPERINTENDENT
/' CONFIDENT IAL
Mr. D. D. Bruce
State Department of Natural Resources
329 Second Avenue
Anchorage~ Alaska
Dear Sir:
Enclosed, herewith, is the Completion. Report for Swanson
River-Unit Well 2!-15 (19), for your information and files.
Very truly yours,
C. V. CHATTERTON
Enclosure
COMPLETION REPORT - NEW WELL D~,~.~i~:~ ~,,. ;,,., ~ ~,.~i~,c~ls
CO , C .LFO .- -
AREA: Kenai Peninsula, Cook Inlet Area, Alaska LAND C~FICE:
Lease No.:
PROPERTY: Swanson River Unit
Anchorage
WELL NO.: SRU 21-15
LOCATION: Surface:
Section 15, T. 8 N., R. 9 W., Seward B & M.
656' south and 1976' east from NW corner of Section 15,
T. § N., R. 9 W.~ Seward B &M.
E .LEVAT ION:
335' K. B.
DATE: August 21, 1961 BY:
K. B. is 15' above ground.
C.~. ~RATTE~0N' DiStriCt Superintendent
DRILLED BY:
DATE COMMENCED DRILLING:
DATE COMPLETED DRILLING:
DATE OF INITIAL PRODUCTION:
PRODUCTION: Daily Average
Oil
Water
Gas
COASTAL DRILLING COMPANY
April 9, 1961
June 7, 1961
June 11, 1961
405 Flowing
393 Gravity 30.3
12 TP 1025
TOTAL DEPTH:
JUNK:
CASING:
SUMMARY
None
22" conductor cemented at 30'.
11 3/4" casing cemented at 1834' in one (1) stage around shoe with
1175 sacks. 7" casing cemented at 11080' in one (1) stage with
2200 sacks.
PLUGS: 11270 ' - 1034~'
COMPLETION REPORT
Section 15. T.
Page 2
PERFORATION RECCRDS: 4 - 1/~" holes per foo~ over interval 11220' - 11139'.
LO~ Rb~NS ~
?)
Schlumberger I-ES Log over interwal 1OO' - 11082'
Schlumberger Induction Log over interval 11080' - 11334'
Schlumberger Sonic Log over interval 1934' - 11058'
Schlumberger Dip-meter over interval 11079' - 1920'
Schlumberger Cement Bond Log over interval 11080' - O'
Schlumberger Sonic Log over interval 11336' - 11080'
SchlUmberger Gam~a Ray Neutron Log, over interval 11267' - 10200'.
Schlumberger~ Cement Bond Log over interval 11260' - 10200'
DRILL STEM TESTS:
WSO - Test #1 on liner lap (7" x 5}") at 10856'.
WSO- Test #2 at 11133' on holes. OK.
COMPLETI(~I REPORT Page 3
SWANSGN RlWER UNIT 8RU 22'15
Section .15, T. 7 N., R. 9 W.~. Sewa~'d B & M
S'~A-N~'oiL dOMPA~D~ OF'=CAL~;Ur~fIO~. .-, OPmAT(R
Spudded at 9:00 AM, April 9, !96L
Drilled 15" hole.
O - 405 ' 405' Drilled
Drilled 15½" hole.
405' - 1674' 1269' Drille~ 80 Pcf Mad
Apri! .!O,~ 1961
Drilled 1~" hole.
1674' - 3040 ' 1366 ' Drilled
Ran I-ES Log interval 3040' - 100' 80 Pcf Mu~
Reamed 15~" hole.
250' - 3040' 2790' Reamed
'Circulated, Conditioned Mud. 85 Pcf Mud
April. 12, 196!
Ran 47 Joints of 11 3/4" casing. Casing froze and cemented at 1934'.
CEMENTING DETAiL
Cemented 11 3/4" casing at 1934' in One (1) stage with 1175 sacks of cement
treated with 0.3% HR-4 using Halliburton power equipment. Used 1 top am/ 1
bottom rubber plug.
~ around shoe with 1175 sacks of cement. Pumped 40 bbls. of water
ahead, mixed 1175 sacks of cement in 1 hr. 15 rains, using Halliburton truck,
displaced in 19 rains, using rig pumps. Average slurr~ weight 116~. Bumped
plug with 1250 psi. Full circulation.
Cement in place at 3:00 AM.
CASING DETAIL: 47 Joints or 1930.76'
Below K.B. .... 3.24 '
Casing Froze and Landed at 1934'
equipped with Baker
shoe & Differential
float collar.
Installed and tested BOPE.
COMPLETION REPORT
SWANSON RIVER UNIT %~LL 21-1~
Section 1%, T. 7 N., R. 9 I4.,. Seward B aM
~T/[ND~ Or~ 00MPA~'"0F'~'~O~i~ "L~01i.. OPERATOR
Page 4
A_pril .13, 1961
Drilled out cement,
Drilled 10 5/8" hole.
30~0' - 3077'
A~pri! !4, _1961
_
Drilled 10 5/8" hole
3077' - 3890'
Drilled 9 7/8" hole
3890' - 4521'
Drilled 9 7/8" hole.
4%21' - %379'
Pulled tight at 5090'.
Pipe stuck at 4770'.
37' Drilled
82 Pcf Mud
813 ' Drilled
631 ' Drilled
78 Pcf Mud
858' Drilled
Circulated out 7 singles from 5090' - 4770'.
78 Pcf Mu~
A~prt! 17,, _1._96._1
Circulated conditioned mud.
Drille~ 9 7/8" hole.
%399' - S870' 471' Drille~
Drilled 9 7/8" hole.
%870' - 7370' l~O' Drilled
Cones and shank broke off bit.
Worked pipe out.
78-9~; ~cf Mud
78 Pcf Mud
70 Pcf Mud
Spotte~ 80 barrels oil; 20 outside and 60 inside, at 8:15 AM. Soaked, moved
oil at rate of 6 ~l/h~..Conditioned mud. Re-spotted 80 Bbls. oil, 2 Bbls.
N-I-O. 20 Bbls outside, 62 ~ols. inside. Moved at rate of 6 Bbls./hr. Loose
at 12:00 Midnight.
COMPLETION REPORT
SWANSON RIVER UNIT WELL 21-1~
SeCtion 15, T. 7 N., R. 9W.~ S~ard B & M
- OPERATC~
April 22, !~961
Drilled on Junk for 2 hours. Pulled cub of hole. Ran in with § 3/4" Globe Junk
Basket. Drilled on Junk 2~ hours. No recovery. Ran back in with 9 3/8"
Bowen Junk Basket. Drilled on Junk, for 3 hours. Pulled pipe and pulled tight at
1934'. Stuck Junk Basket at 1934' (shoe of casing). Made u~ one 7" drill
collar with Bumper Sub below. Bumped down on pipe 3} hours.
96 Pcf Mud
Backed off of fish.~ Bumped fish with 8 - 7" drill collars and 2 bumper subs.
Recovered fish (Junk Basket). Reamed tight spot 1920' - 1934' with 10 5/8"
bit. Pulled. Ran in with magnet. Circulated 2 hours, felt for Junk (Bit
Cones). Pulled and recovered 2 small pieces. Ran back with Bowen Junk Basket.
Drilled on junk at 7370' for ~ hours.
April 24, 196.1
Ran ~.' Zublin, and drilled 7370' - 7371'. Pulled, ran back with Bowen 9 3/8"
Junk Basket, from 73'70' - 7372'. No recovery. Drilled on Junk with 9 7/8" bit and
Junk Sub. 7372' - 7375'. Pulled, recovered some Junk. Prepared drill ahead.
April 2~. r May 18, 1961
Drilled 9 7/8" hole,
7372' - 11030' 95-97 Pcf Mud
Drilled 9 7/8" bole.
11030' - 11080' 97 Pcf Mud.
Circulated out. Ran Schlumberger I-ES interval 11082' - 3040'. Sonic Log
interval 110~8' - 1934', Dip-meter hit bridges. Pulled out for conditioning
rlA~.
97 Pcf Mad
May 20, 1961
Reran with 9 7/8" bit. Conditioned mad and reran SchlumBerger Dip-meter,
interval 11079' -~' 1920'. Layed down 6 - 7" drill collars. Conditioned mud and
prepared to'lay down 4~" drill pipe.
COMPLETION REPORT
~WANSON RIVER ~NIT WELL 21-15
Section 15, T. 7 N., R. 9kt., Seward B & M
8-TAND'~"OiL C°MP~¥ -~-:CALIF'OFd~IIA 'i kr. 0. i~. - OPERATOR
Page 6
Layed down 45" drill pipe.
Ran and cemented 7" casing.
CEMENTING DETAIL
Cemented 7" casing at 11080' in one (1) stage with 2200 sacks of cement treated
with 0.3% HR-4 using Halliburton power equipment. Used 1 top rubber plug.
Pumped 50 barrels of water ahead, mixed 2200 sacks of cement in 50 mins. using
Halliburton truck, displaced in 40 rains, using Halliburton-wagon pumps.
Average slurry weight 115~. 2493 cu.ft, mad. Bumped plug with 2000 psi. Part
circulation.
Cement in place at 5:20 AM.
Hooklead weight of casing:
after cementing before landing casing 250,000.
at time of landing casing 256,000.
CA~ING DETAIL:
Top - 7 its. 7" - 2~- B.T. N-80 300.22
Next- 22 its. 7" - 26~ - B.T. N-80 933.46
Next - 88 its. 7" - 23#- B.T. N-80 3733.23
Next - 41 its. 7" - 26~ - B.T. N-80 1776.20
Next - 43 its. 7" - 29# - B.T. N-80 1802.O2
Next - 62 jts. 7" - 29# - L 8 rd P-110 ~
263 its. 111%7.2o
x over 1 (Diff. Shoe) - Flexi-Flow Collar .... 3.00.
264 its. Total Pipe 11160.20
11160.2O
11123'56
-40
,,,,- 3.. 38
Total Pipe with Shoe & Collar
(Out) (196 Jts. )
(231 jts. - Landing Jr.
Up from K.B.
Pipe Landed
11080.00
Working in cellar. Tested head with 3500~ psi and BOPE with 1500~ psi.
Ran Schlumberger Cement Bond L~g 11080' - 9000'. Top cement at 9500'.
back to 8 lines.
Held OK.
String
CO~PLETIO~ REPORT
SWANSON RIVER UNIT WELL 21-15
Section 15, T:_7 N.,..R. 9W., Seward B &M
S:T~ARD 'O~"COMPANY OF~ CALIFOH~~ ~'~-O':Ii- _ OPERATOR
Page 7
May. 23, 1961
Picked up 2 7/8" drill pipe. Cleaned out to 11075'.
Base Mud.
Drilled 6" hole 11080' - 11100'. Pulled out.
Circulated and started coring 5 7/8" hole.
111OO' - 11127 '.
Cut Core #2.
11127' - 111~5'
Cut Core #3
111%5' - 11182'
,2,8, 1 61
Cut Core #4
11182' - 11207'
May 29, !96~1
Cut Core #5
11207' - 11232'
Cut Core ~
11232 ~ - 112~9'
Changed over to Oil
Ran in and put Rubbers on 2 7/8"
Cut Core #1.
Cut & Recovered 27'.
Cut & Recovered 28'
Cut & Recovered 28'
Cut 25', Recovered 22'
Cut 25', Recovered 241
Cut & Recovered 27 '
88 Pcf Mud
87 Pcf Mud
88 Pcf Mu~
88 Pcf Mud
88 Pcf Mud
88 Pcf Mud
CO~P~IO~ REPORT
SWANSON RIVER UNIT WELL 21-15
Section 15. T. 7 N., R. 9W., Sewsrd B &M
'0 L h - OPEraTOR
page 8
Reamed 6" hole.
111OO' - 11259' 159 ' Reamed
Drilled 6. hole.
11259" - 11297' 38' Drilled
June 1,.. 1961.
Drilled 6" hole~
11297' - 11344" T'.D.
47' Drilled
Conditioned mud, Pulled and ran Schlumberger Induction Log over interval
11334' - 11080'. Sonic Log over interval 11336' - 11080'.
90 Pcf Mud
June 2, 1~!
Reamed 6" hole with 6 1/8" bit and Security 6 pt. reamer from 11080' - 11344'.
Conditioned mud and made up 13 joints, 486' 20~, % 1/2" Liner with Baker float
shoe and Burns Liner Hanger. Cemented with 42 sacks cement. Hung liner shoe
at 11342'. Top liner at 10856'.
June ~3,~ 1961
Ran in with 6- bit and 7" casing scraper to top. of 5 1/2" liner at 10§56'.
Conditioned mud. Pulled and ran back with 4 1/2" bit and 5 1/2" casing scraper.
Top cement at 11139'. Drilled out cement to 11270'. Conditioned mud. Pressure
tested 5 1/2" x 7" liner lap with 2500# psi. OK.
Ran Schlumberger Gamma Ray Neutron Log, interval 11267' - 10200'. Ran Cement
Bond Log interval 11269' - 10200'. Ran WSO-Test #1 on 7" x ~ 1/2" Liner Lap
at 10856 '.
Testor assembly as follows: 2 outside BT recorders, 4~perf'd tail pipe,
7Stype "C" hookwall packer, VR safety joint, hydraulic Jars, 2 inside BT
recorder, hydrospring tester, and dual closed in valve. Used 2800' of W.C.
Ran on 10766', 2 7/8" Hydril drill pipe.
Set packer at 10788, 17' of tail to 10805. No ISI pressure.
COMPLETION REPORT
SWANSON RIVER UNIT WELL 21-15
Se..ction. !.5.., ~ T, 7~ N ~-,~_ R~...~ 9 .W.., ~Sevard B & M
STANDARD OIL COMPANY OF CALIFORNIA - W.O.I. - OPERATOR
Page 9
June 4, Continued:
Opened tool to surface at 10:58 PM for 60 minute flow test.
air for 10 minutes then dead for balance of test.
Slight blow of
Shut in tool at 11:58 PM for 30 minute FSI press. Pulled packer loose at
12:28 AM Recovered 30' net rise, all. Drilling Fluid.
Pressure Data: IH ISI IF EF FSI FH
Top inside 6697 - - 1251 1251 1292 6662
Bottom inside 6670 - - 1276 1276 1320 6670
Top outside 6788 -- 1286 1286 1329 6788
Bottom outside 6747 - - 1271 1271 1306 6747
W~O OK on Lap.
Shot 5 - 1/2" holes at 11133'. W.S.O. Test #2.
Testor assembly as follows: 2 outside BT recorders, 4' perf'd tail pipe,
5~'type "C" hookwall packer, VR safety joint, hydraulic jars, 2 inside BT
recorder, hydrospring tester, and dual closed in valve. Used 2970 ' of W.C.
Ran on 11, O71', 2 7/~" Hydrii D.P.
Set packer at 11093, 17' of tail to 11,110'. Opened testor. No ISI.
Opened tool to surface at 11:33 AM for 60 minute flow test. Light blow of air
for 5 minutes then dead. Light blow resumed after 8 minutes, continued for
3~ minutes, then dead balance of test.
Shut in tool at 12:33 PM for 30 minute F~I press. Pulled packer loose at
1:O3 PM. Recovered 20' net rise, all oil base drilling fluid.
Pressure Data: IH ISI IF EF FSI FH
Top inside 6919 - - 1390 1390 1442 6919
Bottom inside 6887 - - 1336 1336 1373 6887
Top outside 6940 -- 1351 1351 1396 6940
Bottom outside 6865 - - 1302 1302 1469 6865
No plugging. W.S.O. OK.
COMPLETION REPORT
SWANSON RIVER UNIT WELL 21-15
Section,, l~, T. 7 N.,~ R. 9 Wo,~ Seward B& M
~~A~D~'0~ CO~pi~ OF CAL~~~'~ W, 01 ~. O~E~ATOR
Page 10
Ran in with 4~" bit and cleaned out to 11270'. Conditioned mud. Layed
down 2 7/8" drill pipe.
Picked up 2-7~"tubing and ran to 11253 '. Changed oil base mud to crude oil.
Pulled and landed tubing at 11105'. Removed BOPE and installed X-mas tree.
Tested with 3500~ psi. OK.
Perforated liner with 4 - 1/2" holes/foot between 11220' -~1139', using wire-
line lubricator. Confirmed perforated interval by correlation of induction
log with neutron log.
COMPLETION DETAIL
Iustalled X-mas tree and tested with 3500 psi for 5 minutes. Held OK.
Displaced mud in hole with crude oil. Formation oil to surface at 1:30 PM.
Flowed oil to sump until 2:30 PM. Started flowing to trap at 2:30 PM.
Representative flow rate and cuts as follows:
FLOW RATES
BEAN TBG. CSG. TRAP
~?m~OD O~ OAS S
1. 1/2 Hrs. 640 B/D 81 MOF/D 18/64 750 600 50
2.' 1/2 Hrs. 475 B/D 50 mF~ 10/64 P35 775 50
TOTAL CUT % WATER $ EMULSION % SAND a MUD CORR. GRAVITY
1. 0.6 0.2 0.4 0 29.0
2. 0.8 0.2 0.6 o
Shut well in at 4:30 PM. Shut in pressures; Tbg. pressure 1350 psi, Csg.
pressure 1200 psi. Produced estimated 75 ~ols. formation oil. Flowed
155 bbls. to tank and estimated 125 bbls. to sump. Installed cosasco plug.
Rig released 6:00 PM, June 7, 1961.
8. R. NANSEN
SP~: jm
COMPLETIO~ REPORT
SWANSON RIVER UNIT WELL 21-15
$~ection !5,.~ T~,. 7_N., .R;... ?,~.:W...,~. Seward. B &:~M
STANDARD OIL COMPANY'OF CALIFORNIA - W.O,i~ - OP~ATOR
Page 11
DEVIATION DATA
Depth
1734 '
3885'~
4789'
5o9o,
5870'
6115 '
6340'
6716'
7056'
7875'
Degrees
0° 45'
1° 20'
0° 45'
O° 30'
0° 30'
0° 50'
0° 30'
0° 30'
0° 30'
1° OO'
O° 30'
Operator: STANDARD OIL COMPANY OF CALIFORNIA
Well: SWanson River Unit # 21-15
Completion Date:L _.h'nm 7; 1 991
Release Date: ,.J~Y 7; 1963
The Files contain the following material:
Office File
1. Permit to drill and location plat ...........
2. Reports of operations and sundry notices .......
3. Well history ......................
4. Completion report ...................
5. Direotional survey ~ ~~ ~'~
6. Electrical log, Inductien ..... , and sepia
7. Lithology or mud log and sepia ............
8. Other log
9. ~ Remedial werk ......
12.
,i ,
13.
14.
15.
Release File
Remarks:
'UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
BUdget Bureau No.
Approval expire.~ 12-31-f~.
~,o o~-~,c~ ..~chor_~e
LE$$EE'S MONTHLY REPORT OF OPERATIONS
State ...... Alaska .............. County Eene:L__Pen~aula ..... _Field ............ 8wanzo_n._Bi~_er ............................
The follom'i~ is a correc~ repor~ of operation, s and production. (incl~di~ drillin~ a~g prod'~ci~
wells) for thc n~o~-~th of ............... J~e ..................... 19_~, ....... S~aon__R2~er__~n~t ..................................
.................................. Anchorages_ A!eska ..................... Silk, ed ................
Pho~ BRo~ay 7-6201 4~e~t'3 title C. ~. ~ ~T0 ,.
15 8N ~ D~ed ~6" hole 11~,297' - 11,3~o Re,ed to p-1/~", 1~,080' -
11;34~' 'and cemented 51~' of 5~" liner at ll,3~2'..with 42 sacks
NE~ cement. Clewed ~t cement to ~,270~· Tested 5~" x ?" liner
~ ~a6 w/2~oo~ ~si - He~d e~ - ~ ~tron Lok n,267' - ~0,~'
li~er lap OK. ~0~ test of Jet holes at 11~.133~ OK. Rem~ed
Bg~E ~d inst~led ~as tree. TeSted to 3~O0 psi.: Perforated
4~" hol~s per foot 11,220~ -.11,1~~ us~g~t~ro~h ~ing
pr$ced~eo Flow retes::~ 640/475 ~ oil, 81/50 MCF/D .gas,
ca~ing ~essure. ~O/50~trapoopress. O~6/0~8% tota~ ?ut,
waSer, ~.4/O~6% ~sio~. 29 corr. gra~tyo Shu~ mn weiz at
4,30 PM.'. ~g released St 6,00 ~, J~e 7,~1~1.
cc
U.S.G.S. -Me,win I. Soyster (2)
~R~bfield 0{'~ ~o'r~ ~ -C. W. ~erry
i I t R. R. Ritter
Ohio Oil Co. '-, Geo~e S~ards
Un~on
o~ co.- c.
S~th
Pr~u ing ~
Fi~s: ~plo~ati~
o~
L~d
NOTE.--There were ...................................... runs or sales of oil; .............................................. M cu. ft. of gas sold;
............................................. runs or sales of gasoline during the month. (Write "n." where applicable.)
NoT~.---Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in
duplicate u-iih the supervisor by the 6th of the succeeding month, unless otherwise directed by thc supervisor.
~ 9-329
Oan~ry ]950) ~
UNITED STATES
DEPARTMENT Of THE INTERIOR
GEOLOGICAL SURVEY
Budget Bureau No, 42~ t{356.5.
ApprovM expire.s 12-31-q30.
,
LAND OFFICE ..
LEASE NU'BER -02~0h06
UN,T ..... S_~a~oI~. ~e~ ............
LESSEE'S MONTHLY REPORT OF OPERATIONS
:TTve /'ollowin~ i3 a correct repor~ of operationa and prod~ctio~ (¢ncl~din(2 drillin~ an.d proehecin~
well,L) for the m,c.~Zh, of ............ M~Y ..................... /:~ 6~., ................. S. W4DSgD__~__~D&~ ..........................
,~-,:,~ ~,.~ P. 0. Box 7-839 ..
~'- ............................... ,
Anchorage, Alaska
.................................. ~ ........
sa..~ ........ ' ................... ~~7-~°~ ...............
15
8N
cc:
Drilled 9 7/8" holD 8362' - 11,080'. Rsn Induction, Electrical, Sonic,
& Dipmeter logs. Ran and cemented 7" cssing ~: ll,080~ in single
stage with 2200 sacks of cement. .Installed and tested BOPE. Ran
~e~fi~nt ~ond Log C!e~ed out cement to 11,075' Ch~ged over to
Oi! Base mud. Coring 5 7/8". . Drilled out cement and drilled
ho~e ll,OSO' - Il,lO0'.'. Cored 5 7/8" hole ll,lO0' - 11,259'.
Drilled 6" hole ll,lO0' - 11,297~.
U.E.G.S. - Mean ~o Soyster~(2)
Richfield O~l Corp'. - C. W. Merry
R.R. ~tter
Ohio Cji Co. ~ George S~ards
Union Oil Co~ - C. E. Smith
Fi!~s: Produ lng
E~lo ~atton
L~d
NoTz.--There were ...................................... runs or sales of oil; ............................................. M cu. ft. of gas sold;
.............................................. r',tns or sales of gasoline during the month. (Write ",,," where aI)plicable.)
No~P~:.~Eeport on this form is required for each calendar month, reaardiess of tho ~tHl t~s of operations, and must be filed
duplicate with the supervisor by the 6t, h of the succeeding month, unless otherwi-~o direcied by the supervisor.
Form 9-329 1,; - 2:,7,36 8 U. 'i. r;OVgRN~r,IY PPlHTIN~ Orrlcg
(January 1950)
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
Budget Bureau No. 42-',i3,~.5.
Approval expiros 12-.31--450.
/~ ~ ~ESSEEtS:~MONTHL¥ REPORT OF OPERATIONS
T'~e followlr~ is a oorreet report of operations and prod~ctior~ (incl~din~ drillin~ and prod~cin~
wells) for the month of
-~ ' ' - ............ STANDA~ OIL CO. OF C~LIFORN~
..................................... .........................
15 8N J~ Spu~d~ ~:OO AM 4-~1. Drilled I~;" hole ~- 405'.' Drilled 15~"
J h01~ 4~ - 3~O'. ) Rea~d 15~" ho:.e 250' - 3040'. Stuck and c~nted
~ I o~~ lo 5/8. ho~ ~O~0, - ~89o, '
Drilled 9 7/8" hol~ 3890? - 5399'. ~lled ~ight at~5090'~ pipe stuck
at ,~770'~ Spotted ~160 bbls. oil. Pipe stuck. 16 hrs. worked pi~
~oose ~ out. D~ed ~ 7/8" ho~, ~399' - 7370'. Cones, sh~
bre~(e off bit. R~ Ju~ basket, ~illed on junk. Stuck junk basket
Recovered. j~k bas,et. He~ed tight spot. Drilled on Junk, recovered
Icc:
NoTz.--There were ........................................ runs or s~les of oil; .............................................. M cu, ft, of gas sold;
runs or sales of g,~soline during ~hc month. (Write "no" where applicable.)
No~.~Report on this form is reqaired for each calendar month, regsrdless of the status of oper~tion~, a~d mu~t be flied in
duplicgte with the superv~zor by thc 6th of the succeedin§ month, unless otherwise direct, cd by the supe~'vi!,)r.
(J~nunry IgSO)
Stint. rd Oil Co. of ~~l&
Iff:
lemal'k8: Cor~ II'rom 11100',011259'J, recovered
SUNDRY NOTICES AND REPORTS ON WEL.L~
~f ~ ~~ ~0 ~~ ~ ....................... ~ ................................................................................. '
........................................................................ , ............................................................................
The elevation of the derrick floor above s~ level is __~_i .... ff. ~prax:l~%e]j.
DETAILS OF WORK
Drill %0 ~000'~ log a, at oe~rf~ 11 3/b" easin~.
I~~ ~ ~st C~s III ~~t ~ntion
APPLICATION FOR PERMIT TO DRILL, DEEPEN OR PLUG BACK
APPLICATION TO DRILL~ DEEPEN' [] PLUG BACK []
NAMtg OF COMPANY OR OPERATOR DATE ~ 17, 1~1
Address City
r. o. i~ 7-839 ~(m
State
DESCRIPTION OF WELL AND LEASE
Name of lease I Well number [ Elevation (ground)
Well location ~ve footage from section lines) Section--townsh~)~rang'e or block & survey
Field & reservoir ('If wildcat, so state)
County
Distance, in miles, and direction from nearest town or post office
Nearest distance from proposed location
to property or lease line:
Distance from proposed location to nearest drilling',
completed or applied---for well on the same lease:
feet ~ feet
Proposed depth: Rotary or cable tools
Approx. date work will start
Nllmber of acres in lease:
Number of wells on lease, including this well,
completed in or drilling to this reservoir:
If lease, purchased ~vith one or more
wells drilled, from whom purchased:
Name . Address
Status of bond
Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present
producing zone and expected new producing zone)
$~. ,~, CO. 0r~
CERTIFICATE: I, the undersigned, state that I am the~S~*~'~~ of the ~~:]P~ ~e~~':$: ~
(company), and that I am authorized by sai'd company to make this report; and that this report was pre-
pared under my supervision and direction and that the facts stated therein are true, correct and. complete to
Original signed
the best of my knowledge. ~J, T, CROCKER
Permit Number: 12-61
Approval Date: March 27, 1961 ~ .
State Geologist
Notice: Before sending in this form be sure that you have given
all information reqUested. Much unnecessary correspond-
ence will thus be avoided.
See Instruction on Reverse Side of Form
Signature j. ~. C"~R
Alaska Oil and Gas Conservation Commission
Application to Drill, Deepen or Plug Back
Form. No. P-1
Authorized by Order No. 1
Effective October 1, 1958
NOTICE
The following well logs and oversized
documents have been placed in offsite
storageu To view these documents,
please contact the AOGCC librariano
AOGCC
2/16/2005
~
I;
~¡
, (~
'~~,~,~~"'~~~'\.~~~~~~~"""
S C HLUMBE RGE RWELLSURVEYIN GCn RPORA TION
:s. '8 nus TON, TEXAS ,
RUN No.
Date
First Reading
last Reading
; Feet Measured
: Csg'..Schlum.
; Csg. Driller
, Depth Reached
ì\.....;~t~~;D~rti~l~r
Mud Nat.
... Dens. ! Visco
Mud Resist.
" Res. BHT
Rmf
Rmc
... II pH
" Wtr. loss
Bit Size
i Spcqs.-AM
~ . - MN
iND.
Opr, Rig Time
i Truck No.
R.ecorded By
Witness
REMARKS
f
Cartridgs No.
. Panel No.
~ Sonde No.
~
~
WELL
Location of Well
1
"
I
. :'
@
L
I>!
I
. I
~
I
.:
¡Elevation: D.F.:____-
i K B "7'{¡,o, I
. . :~",l ~i."', <,,;J
or G.l.:~?:2
STATE
FltINGNo.
z >-
>-,-0 Z
1-. 0 i= <eLL, COUNTy"k':'J:.
Z .a « -I c... ,~, ',",
=>0-1 ~
OõjOw 0
U Ü:-I 5 .U
f" ,~: I ';-,.. I
. - or- @ ~-~' ':'f ;, o-,,-~@ - ':'F ,-; - @ - ')f
@ L~C~C)@ i OF @ of
'"'" @ ,- of ~oiì)'O¿I@ of @ of
."-""' @ ,.." of @;:)oF @ of
@ of => @ = of @ of
CC 30 min.-':> CC 30 min. CC30 min.
"~
I
@ of
@ of
@ of
@ of
@ of
CC30min.
~ .J'
I :,~;> :
i -_.
I
I
I ,- .
I.~__-
FOLD HERE
,,<
,-j;) n
.~ : >
-' 0 0 '" --. ~1
{ 1
("-
,¡¡
~ ...,.. ---' "...... - .....,J ~ ......
~ - ,,",
,
~
I
@ OF ('
@ of
@ of
@ of
@ of
CC 30 min.'
- , ....-
-- ~ ,
, l
t-
3;- <t
}o- 0-, Z ~- .
u ~ :::: -z
z C~
-oJ:Z~ 0
C CO u.; du..
t- > '.r.~-
--::::(..J
a.. '.0 ~ I r.:; ~
~ --Xc...>
I ZC\1'':C
.:t c t-u..
Z -~ V10
W NZ
~ <t
Z3,:
,-OV":
Ot=
O<~ .
,...."U ...."
~g~
Reading
Readi n~
Measured
Schlum.
DriÎler' ,
Reached
Driller
Nat.
I Visco
Resist.
~-'~--'Res. BHT
," pH
","'Wtr. loss
"Rmf
:Bit Size
'Spacing:
I
, T3-Rl~R2
T~Rl_R2
Opr. Rig Time
Truck No.
Recorded By
. Witness
r
COMPANY ST/-\NUARiJ ()! L .
COMP¡~Y OF CALiFORNl~
iES
location of Well
WEll ~\i¡\N.sOH R i Vt:g. UN] T
21-15
FIELDSv~AN SO Nf{l V ['R
LOCATION21-15 T8N R9W
>-~.
Z::1:
~~COUNTY KEN/\I
~o
8u STATE ,L\LAS K/\
KB
ONE
5-19-61
. J " ObB
921
- 9131
'j9;>1
1934 '
I I . 06:>
II . 08 {}
L I Mt~ UA5E
97 I 06
I . 46 @ 7 U ° F
U. hh @ I ~R OF
I? @ - . of
3 . U CC 30 min
I f: D4 @ 59 ° F
RFM/~RK~
, 3
192J Toll,O~8
To
4 hrs
- 3 => 02
HATLELIU
,-, Wp.LL
Elevation: K.B.: 33 t>
D.F.:
or G.L.: 3? 0
I b Ft. above GL
PRECINCT
TWO
6-1-61
11,3]6
I I . 08 U
. ? t-\6
I) . 08 Ó
I I 41 08 0
I 1 , 34?
I 1 . 344
~,~ l b1\S~ ~O
XJ @ OF
@ of
@ , of
CC 30 min
@ of
@ of
@ of
@ of
CC 30 min
@ of
rU
h
?&
J 1 , Of't)frof I ...3 36
. °
~ ? Jl rs '
-.3 ~ (k~
IJT~ r:':~
(-~ I ¡ L; T
To
To
u¡
~ N
IIJ -
:I V"
I C
5 to-
Il.
c:
l"-
Nca
NC1J
. I
r.:to.:
.. ..
ó ci
ZZ,
UU')
....I -I
»
U')
~
cr.
<:
~
w
cr.
. ..
,~
COMPANY ,TANDARn 0 I J
~
r- z CO~1P .i.\N Y OF CAL I FORN I A
0 3:% Q:::-
~g;= ~ WEll )WAN~()N RJVj~R UNIT
(.,) f' 0::: 0-
u.: ZlJ.¡....l 2'1 It-
ec .e> ~ . - ~
0.. t ~ r:¡ '.
- .1.t}. 1;t) ou~flElD S y~AN S ON ' R I V~R
~~ :!~:!: '!. LOCATION 21- I:) - T8N-R9W
'M N,Z'C\J V'1Z
- zi >-~
..~.. ~ ~<11 ~$
)'!:) 0 ð ~.. ~u COUNTY KF NAI PRFC t NCT
.- ~O,¡¡j ow 0
u ü:..... ~ u STATE ALASKA
log Depths Measured From KR
I R,UN NO.
Date
,First ReadinQ
LQ~tReadinQ
FootaQeMea su red
Max. Depth Reached
Bottom Driller
,Maximum Temp. of.
Fluid Nature
Fluid level,
{Casing Size
. Casinq Weiqht
CasinQ Size
Casing' W~ight
Bit Size. '
Bir Size
No. Counters U~ed
Type Equipment' '""-
Type Pnnel
Opr. RiQ Time
Truck No.
Observer
Witness
15 '
ONE
6-4-61
11,?61
1O,? 00
1,067
11,269
II . ?1 0
OIL BASE MUD
FU' I
7 in.l
?1 ~b. f SURF to II 08 0
:>3 In.}
? 0 lb. I 08 ~6 to J J -'47
9 IT in.' to t J QA 0
h in~i I OB Oto ¡ L144 '
NtD-A GLO-E
8NÞ~ë5
4-J,~ tirs
.1;0:'.
LAVERTY
(;ILBERT
eBL
location of Well
Elevation: D.f.:
K.B.: 33S~
or G.L.: 3?O
filiNG No.
w
a:
w
::t
'0
.J
0
LL.
Ft. above
Gt.
in. }
lb.
in. }
lb. .
tQ
to
to
to
in. .
in ~
-
i~~~=~~'
. .~ 'HOUSTO~..TEm 4 . ".
I. I .! COMPANL5T.4NDARq 011-
I d
: adt- ~
1- ~- ¡
~-', ::J..... ~I -:1 W "., 'r r -
""" ~....;;...... E II ~) h I- \ N S (.I N ;{ I V t:. K. U NIT
u ,~ ~~z
t..U :z':r w ~ -.¡
.0::; 0 > :'J'':: :2..,
Q.,. U') - ...:( e::': ,
% ~ n ocFIELD
.... :.:t - Z w..
<: 3: Z 1::(-
% ~o-I-- LOCATION 21-1~-TfH~-R9W
w vr.'\J ~::.r:
.'~, z c.;
~~Ô~ ~IL
.... 0 ¡:: V) < c
5 C<:j ~ COUNTY K~Nl\1 PRECINCT
O¡:j¿Sw 0
u~¡¡: -' ~ u STATE /.\1 i~.S K l\
COM? f\N Y OF CfJ.LI FORN I.A-_~' n: (~. ')1 C
LOCA TrON OF WEll
?i-i~
S\ÞJJ.\NSON RIVER
..
RUN No. ONr: Mud Nature
Date ~/2 0/61 Mud Density
-Depth Datum KH Mud Viscosity
Firsf Reading I I . 07 9 Mud Resist.
las,t Reading 19?1 Mud Res. BHT
-
Feet Measured gl~R Mud pH
(S9. Schlum. 1921 Mud Wtr. loss
C5g. Driller 1934 log Speed
Depth Reached I "082 Bit Size
Bottom Driller J ! 08 U Mag. Dedin.
Truck No. 3 ~} 02 Sonde No.
Recorded By ~I /, T C:! , n DCM No.
- , , '~,-, 1... ~ r..f
Witness ~'J {\i.,l Opr. Rig Time
~r~'¡¡'w¡¡¡¡~;i¡i¡¡¡;,¡~.:;.¡¡t;..~'''''''''''7';'~~''';;';;''''''"4':!\.~~i/'
ELEVATION: KB ]3~-
DF
Gl 32 Ü
..
ROll NO.
., I 1.)lf:--..D l~.c:.+= '
,,;"f f' .~ [} ~ "A<.:.J or. .
97
[j 'j
c:
:r: .
~ ~
I .46 '@ 70°F.
0 C
0.,66 @ I ~6. F. () t
U (
0 F. ..
c:
CC 30 min. () ~
=> ..
~6
I?
@
J.u
40
FPM
0
w
V)
=>l
u...l
r c' ,ij r :{$
~ (
u
? r 0 1;' ( /'~ Ç" 4- ) W
"n 1 - c_, ., '''' :r: 1
U
RjJS"",~-~l;
V)i
~
0::
«
<
w
0::
r: ,~
, - . .
l' ,
!')1. hrs
. ."'e~~~~.._",_.....~,
~'i
~j
¡[J
r~j ,..,
W') -'- ù,
..---.- -~
i
~
~ COMPANY -:~J!,'~'LJ..~,r¿!~'~~J)j L
,
,--~.; J ;)~)HP }\N Y O!= !~f-\L I f=Olzr-! ! h
~
, ~
'¡WEll-
C) J
i
:;1
~>~~ i
¡
2~--ib
('\J
z >-
>-,-0 Z
Z ~ ~ -J ~L!:, COUNTY KE
:::J 1-1 U -I :;E '".;
OüjOw 0
ULL-J3: u
STATE
RUN No. ONE
I Date , iU œU "'" 61
first Reading ] 04 ()
ii, Last Reading -,- IOU
~'" ~eet,Measure~ ¿y./! Ù
" Lsg.. Schlum. -' -~,
i~Csg. Drille~:~ uH """ i ú S ! 934
i Depth Reo.ched__3 u.4 ~ I i 0 083
~ Bottom Dnller 3D - r ¡ -ti 080
~ Depth Datum ~.~, . K b
~ N\ud Nat.:--"' L~
t1 Dens. 'I Visco -==-'5: ,:~'I-j {~~} 97 I ~6
J Mud ResisL_- ~UJ @ J3°F! ß'4S@ 1 Jür
I " Res. BHT C)J)@! ~:9°F 0ø6(¡@ I ~6°¡:
I Rmf -= @ -- OF I.04@ 59°F
I Rmc --.... @ - OF 3016 @ f.:j°F
" II pH @ OF ~ 2 @ ""'" OF
: fI Wtr. lo~ CC30min. .:L,ÛCC30min.
1 Bit Size Q¿ {\RK
~ Spcgs.- AM ! ('; .~
~- I I
~ N\N :~ ;ti)~ @
~~- --:~ '¡~ ~ ,','
t. IN D. if U G i ~!- 4 v
. Opr. Rig Time ,¿~ 1'1 rs - 2"bhrs
ì Truck No. - J ;:) IJ2 3:2 02 ,'-
I, .R.:ecor~edBY ,u ¡ HJ-\ JLt:L ! iJ-
,Witness, I
: -, ....- c.- __1,_-
TWO
5-- ~ 9-hJ
t l-t -08 2
;::\',8 ~ ¡?
8i~bO
~"~,t;":~' ~'/:;!,)':.'}:::.';" .,~~:: -~,..' ",.' ' .' >\,' ',¡ ,< '
';:,"'ì;k,.iÍ!;:-~,> ,:¡;ZCOMPANY STANQARQ,"o':.i:cOMPANŸ OF
. ,[¡~::ir~';.~~~~::>[~;¡ii~~::;:;/~~¡~i6.~;~{!-'I..
',..., <~~' a.L fIELD"SWANS'ØN,;'f'~";"6t\.i;/>'<'c,; ," , ,
-}: ,
-,
. 'r''+
.;£Ü:,"-I:~,,(u;:Sec. - ,16'\."<'.TYfP~<i.'!lN--, '.,'..' Rge!, 9W
~:j._~~ ;. ~~.~:: ';..'.' " . " .,' '. .
i:";, '~rm'aMntDçltum:- "HI ~-":' " :," ' "., Elev. 3? n Elev.: K.B. ~l:~~
:',~;~~ ~~ig:Measf.red From, . K~ '."'",' , 1,5'. Ft. Abo~~, P~rm~. Datu~ '" D.F."
,'~:;'Pdmng' Measured from [(.f$ '" ' , G.L. .120
r ,;' :'.\., ",
~::: ::D¿Ùe: " " '-',' b-2 1-6 I .', Type fluid iri Hole
:~:t "Ron No. ' , ON~ Dens. J Vise. .
:~J.:.DePth-Driller II . U80 Max. ReeD Temp.
~~' ,Depth-Loqqer ' Est. Cement Top
<:~ :Btm'~~toqlnterval Equip. ,I Location'
!->"' Top Log .Interval 'Recorded By ,
;,,,~-: O~e~ Hole'Size' 'r;JIr:~ Witnessed By
!."::ICASING,REC.- 'Size Wt/Ft' Grade Type Joint
I." SUrface',StrinQ,' . tl~ ,.41: ' ~..H,~ .taR '.
f~1:;- .{P!:~~:~:~tri'~fJ":';¿"~':/' "j."", ..' ".,;. .' ~',~':
ff.:rr:~;'$~r~"~g .""...,.. ... i'l'~i4:1~6~~~~nC3\.1~"6 tM
i,,(~:"';:(:>j"";'>,.',\ """"".',' '.','. "" .,'. . PRIMARY CEMENTING DATA
f,'",'.,',',:".'.~,..-.I. .~...~.'.,S..,...+.,."".~.R...""I....N....,,'.. G,',..'...,..,'.'.':"".'.'''.'.'', '.'.;..,'.;:,..'.'.'.~.'.'.",".::."".'.'./,. ,'.".',""';. .","~,,'\...-."""',,'.','.;.'.S. ,'"U r.,.f. ..°..,... C".e, ' ,..f.' ..',.'...'" Protecti 0 n Produc. ti.o n"
~k:¥~l~*of~~ihe.ri.f"~": ';'~~~~~\6.;:i_;:~AX/;- ' 22 00 . ~f4~., , '
(:£~'êT1F.~~~f/c¡m~Ì1t;';:.r;t)tf!{~R'fJ:mø - -'. r:OrlS ~RlJCTJfN
:¿./Adäitiv'è;':Y ~:;:";'.' " '::: ..",~. "'i:~}.,',: ;:' ,
I¿iir~í~~rih>:~i;_:':~..'...'è.".'. .
~j~m~~~i~~~:~E.:;,.'f~;;..~;'~'~;,+.:.>:,..
:~
"
'A\,'Þ.SKA
'qther:S~rvices: '
',ES,':'''Cf'C :
, .,' ,.;J"'..,
COM
LIME fjASF
'~7 I 4~
165 Of
2160
-iAL IAJRDII fi t I 0
. HATLEL I 0
GII.Rf;RT '
. Top Bottom
() < 19;44
0
I'r, n80 '
Li n e r'
, '
111
c:
¡
.x
0
oJ
0
LI.
':t-:i'ME ' "
',-91
11
:-1 ~.;,:~;;t~: ;?(~''i .', " ',', ," :. 'X:' , \' , " ' ,>^' " '
t ..~ :'~>;:~~H,"" < ",'l,~ COMPANY ~ TANOAR() 01 L "COM PAN Y 'O'F'
, !'~e.tij! ~~.,',:' :,,~AL I.FORN~~ "".;
""'~':~:/~~':,: C1~ :WÉiL.-SWANSO:N', RI'VE'~, -(n~"T'" ",:2't,-I~' ,",
;.~: ,.' <~,~...n ~ '..;:~,' ":",".' ';" ',.:""" ,,'>, ":-,:,, ,.,,-
':':~,.:.:;:;}Z',i'Y'~',:FIE,Lb' SW-ANS()~"'~'i:y,F;R"'_,';,"';':' , .::'", ':',' ' ,
~,:;~ ~'~'," ,,'" .' ',";::,;"1,,: ,,' , "'."', d; " "
~'!..:'.';;>:fZ';£.",j:~COUNTY' :""~~'~A 1::"';,'P'Rt;'CfNdT~:~',"";;'\ST ATE'-'AiA)K"A - '
cill!'t 'J~~TIO~è'i:,::,:i "': ,,'," ."".,,; ,,'... ','.'", '.".'.'.:,.i ': 'O~:: Services.'
: u ¡¡:,..., ~.." ,U' Sec. ,I!; Twp.' RN Rge~, qW
Pertriè1:,n'entDatum:',' 'GI.' ,", ",,', , Elev: '~1~(j Elev.:',K.B. .13~
¡~mIŸM~~~~~~~;i*¡',~~'Pt":~~W.t~~~!~~~y.;,'~t~WB~!4CÍ)" .' '..',~~g:r: .,~ (I ,
-'~~~~~~.::'~¡;' " ,6;~6i ." """, ,". T~~~.IUif ~~;s~ole P:~ ,0 t ,L ~ ~~ia
Dep.'.t,,""',..~Driller' ." " '~';',,'~,"'ì1'" ",'I'ê."';\,'.'i't~"~ ,'t"'::' ", " '.' '.'M, ax~ Rec..Temp.' " ','::' OF
~I . ,.~ ...' , '" , , . '"
~.1)e,n.'t"h. "~LdQqer, ,;"" :,.', "",~' :' ,;. ", "', ':.. :..:, " Est~','Ce, rnent Top -'" ;t"?'.-, ','
\I' .r:: . .. ...J.' -. -". \ I. . ..
: ',Bt",1:>:L?Q"lnte'rval"":":"J.I,"?6Q",,',':':':'<;' Equjp.'I-Loc~tion ',' CRt'.,~ I ~ 110
-:roP1o~ Interval. , ' 10': =!;OO':, :', '., ',Recor~ed' By'.' ,.' LAVERTY
'Open:,tiole Size', 9~'I""08o-'6'" Witnessed' By ';, ' 6 J ~BERT
, ëÄSI~ð :R, ~C~., -~, . "Size',' ,Wt/Ft'" "Gr~~e. Type Joint -' Top"',' Botto,m
Surface,Stn~Q , Iii, ,'4t;: ,'Jt)5, ,: l..1$~ ' .. 0,' -:-, - 19A4
Protl~StrinQ" ",,'~:"'-, . '~," .- "", '''-'~;'_: ,"', , ',.-',
. Prød:,Stri~q", 7, ~~Ä?'9'"rRR ,', " .T1R~ 1,,(1( , 0 ';~;: II . 080 . '
'lï,~~~)i:~~.~"..i""i'< i"~"';"i',:';~~;~:~~~~~f:~~.;;;~;¡.,.;.;,:.?t~~~'~f.~""i.~,.,'I/~.1~
STRING':'-, " <'" ',..r ',Surfáce:'~":" Protedion --:" , Productiòn"?" ,> Liner
Voi..'ofc'ement " ,: : -' .," " ,;~., ',), ,:., 4?hX
,Týpe:!of':cem'ent): ,. :' TV~peA-'<D4$1:
:~dditivê::":;-'-'>,>," '::- " ,i~, ,,'- '"
,::Adc;J,iti 'Ie.' by .%
Retarder
,Retarder by %
'II Wt. of slurry
, 'Wdter:::Jò's s:<,,:, ' . ;'
gi;m~~f~~~;:"1~~;~:' '" ""i1~/?
- HR4
" :':(}i3
, '1"1,7
,~: , 01-['; BASE
Or~ASE
\¡J
0::
\¡J
'::C
C
.J
0
I&.