HomeMy WebLinkAbout161-017lc-apfm
lO,an95
LOCATION
CLEARANCE
REPORT
State of Alaska
OIL AND GAS CONSERVATION COMMISSION
PTD No. -- ~l ~
Memorandum To File: API No. 905--/06;C93-OO
Operator .. ~O/'=p~ F~f[~ ~o-~
Abnd Date
Spud: 3'/[.~/~1 , TD: ~.~.O , Completed
Note casing size, wt, depth, cmt vol, & procedure.
Long Csg."
Liner:
Perf intervals - tops
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
~ugs.. £ ~'~'~ - ~ $ z¥ . .,~"~0 - ~ ~ _ ~. /~' - 0
!
Well head cut off:
Marker post or plate:
Looation Clearance ** ,?~,~__.,.
Conclusions:
Code ,,
June 27, 1979
Mr. Todd F. Butler
o~ Exploration and Producing Services, Inc.
P.O. Box 900
Dallas,- Texas 75221
Re: Acquistion of Drill Cuttings and
Core Chips for Source Rock and
Palynological Analysis
Dear Mr. Butler:
Pursuant to our June 27, 1979 discussions, permission is hereby granted
to Mobil Exploration and Producing Services, Inc. to make small
quantity cuts~bf.~elegted intervals from certain wells in the state's
public 'library of' Alaska well samples and cores for the purpose of
conducting the following analyses:
1. Total Organic Carbon amd Pyrolysis ("FID - C")
2. Vitrinite Reflectance
3. Palynological Analysis
The wells from which the small quantity sample and core cuts are to be
taken are:
'BP Alaska Inc, White River Unit 3
Colorado 'Oil and Gas ,~'Core Hole
" " " Core Hole 2
" " " Dangerous Riv Unit
" " " Malaspina Unit 1-A
" " " Yakutat 1
" " " Yakutat 2
" " " Yakutat 3
Phillips Kerr McGee Sullivan 1
" " " Sullivan 2
Richfield Oil Corp White River Unit 2
Permission for the above mentioned sampling is granted with the
following provisions:
a. Cuts are to be made only from those individual intervals in
which the volumes of sample or core material is greater than 10cc. (no
cuts are to be extracted where the volume of material in the state
sample or core envelope is less than 10cc.). Mobil will provide the
Commission with a list of the specific sample and core footages sampled.
b. Mobil is to provide the Commission with a report setting forth
the results of all total organic carbon and pyrolysis analyses. This
report will be released to the public. In the event Mobil voluntarily
Hr. Todd F. Butler
2 '~"~e' 27~ ~979
submits reports on the vitrinite reflectance and palynological
analyses, said reports would be kept confidential, if so requested.
c. Mobil shall assume all costs involved and shall provide the
Commission with a set of all vitrinite reflectance slides and
palynological slides prepared end'return all remaining sample and core
residue.. It is understood that all materials, analyses and confidential
reports will be ,received by the Commission approximately October 1,
1979.
It is mutually understood that the state's well sample library is
public property and that granting Mobil permission to extract portions
of the materials in this library for the purpose of preparing the
respective ,slides and conducting the above analyses is in the public
interest.
_
Very truly yours,
William Van Alert
Petroleum Geologist
cc~ Mr. B. llipp, gxpl. Supt. Alaska
Mobil E&P S~vtce, Inc.
P.O. Box 900
Dallas, Texas 75221
COL, 0~D0 0I~. A~D GAS COR~0~A~Z0N
]DENVER CLUB ~UZ~DZNS
.... J~e 14, 1961
JUN ~0 ]~6~
State of Alaska
Division of Mines and Minerals
329 Second Avenue
Anchorage~ Alaska
Attention: Mr.. Donald D. Bruce
State Geologist~ Petroleum Branch
Re:
Core Hole No. 1
Icy Bay - Cape Fairweather~ Alaska
Development Contract
Gentlemen:
Forwarded herewith are copies of your Plugging Record form
and Well Completion or Recompletion Report and Well Log for our Core
Hole No. 1.
Also enclosed are copies of the Electrical Logs~ Micro Logs~
Gas Detector Logs~ Sample Logs and chronological Drilling Report for this
well.
This material should complete the filing of records on this well.
Yours very truly~
COLORADO 0IL AED GAS CORPORATION
THomas D. Pybd~._~/ -
Drilling smd Production Department
Enclosures
' PLUGGING RECORD Core Hole No. 1
Operator I Address
Colorado 0il .an,d., Gas Corporat,i,°,n, . .., ' 100Q Denver C,lub Building, Denver, Colorado
Name of Lease ~ Well No. ~' Field & Reservoir
Icy Bay -,Cape Fairweather , ,I It .,~Icy Bay - Cape Fairweath. er ....
Location of ~ell Core Hole No. 1 Sec-Twp-Rge or Block & Survey I County
75, ~TL ~00' Y~rL oi. SeCtion 20 - 27S - }~Ej ~akutat Villa
"1 Character of well at completion (initial production):
Application'to drill this well was filed Has this well ever Oil (bbls/day) Gas (MOP/day) Dry?
in name of pr°duced °il °r gas !
Colgrado 0il and Gas Corp. ~0 , X ,
Date plugged: ....... [ Total depth " ~nount well producing when plugged: '
Oil (bbls/day) [ Gas (MCF/day) [ Water (bbls./day)
Name of each formation con~ Flui~ content of each formation Depth interval of each formation Size, kind & depth of plugs used
taining oil or gas. Indicate Indicate zones squeeze cemented,
which formation open to well- giving amount cement.
bbre. at time of plugging
Well Plugged 'and ,,~ 2440 -2324 / 25 ax..
CASING RECORD
size Pipe put in wen (ft.) Pulled °ut (tt,) ~eft.~n well (ft.) Give depth and " 'Packers and shoe~'
method of parting
slng <shot. w/
13-3/8 , 45 ,,, ~ ,0 1~6 , ,,rtppedete)-~ Set ~ 78 KB 62 ax. ,
V-~/8 49Y .... ._-O - 497 ....--- ,,, Set ~ 509 KB w/ 13,0 ax.
,
,
Was well filled with mud-laden fluid, according to regulations? Indicate deepest formation containing fresh water.
NAMES AND ADDRESSES OF .ADJACENT L~-~SE OPERATORS 0R OWNERS OF THE SURFACE
Name Address Direction from this well:
Adjacent lease owned b,y.-',his grou
In addition to other information required on this form, if this well was plugged back for use as a fresh water well, give all pertinent details of
plugging operations to .base of fresh water sand, perforated interval to fresh water sand, name and address' of surface o~vner, and attach
letter from surface owner authorizing completion of this well as a. 'water well and agreeing to assume full liability for any subsequent plug-
ging which might be required. '
This well was not plugged back for ,use as a fresh water well.
Use reverse side for additional detail
File this form in duplicate with the Commission.
of Drilling and PrOduction
CERTTF~CATE: I,.~he ~ndersigned, state that. I am~ th.cHanGEer / o~ the ~Colorado 0il and Gas Corp.
(company), and that I am authorized by sa~d company to make this report; and that this report was pre-
pared under my supervision and direction and that the facts stated there~,~e~correct and complete to
Alaska Oil and Gas Conservation Commission
JUN 20 !961 . ' "' Plugg~g Record
Form No. P-15
'.?ii ~?~ (~,.; !/~,: .tio~ Authorized by Order No. 1
~'~iaska D~;~, of iNatural t~esourc~
WELL_COMPLETION:, OR ._RECOMPLETI.ON .REPORT AND WELL LOG ,. Core.. Hole No.-,1
:
" , · ;:: DESIGNATE TYPE OF COMPI~ETION:
New Work- Ptiig ' ' Dtfferent
Well ~]Over [-~ Deepen ~-]Back [--1ReservoirSame ' ~ Rese~oir ~ Oil ~ Gas
,
DESCRIPTION OF WELL AND LEASE
.
Operator [ Address
Colorado 0il ~d Gas Co~oration 1000 Denver Club Building,.. Denver~ Colorado
L~e Name ' I Well Number I Field a Rose,elf
~7 ~7 - Cape Fa.i~eather~ Core No. 1~ ~y B~ - CaPe. Fai~eat~r
Location Approxi~te: ~ Seo.~T~-Range 6r Block & Su~ey
75' ~L ~300' ~I~ of S~tion ~ - 278 - 35E
County [Permit number ] Date ISSu~ ~ Previous permit number ~ Date Issued
~aWutat y~l!~ 24, 1961
~ spudded ~Date total deP~ r~aeh~ ~ Date completed, read, to ~ Elevation ~ Elevatlo~ of casing
produce ~ (B~, R~,~ 7~ feet
~y 18,,1961 I J~e 3, 1961, ,P~-J~e 3, 1~1 ~~"'t hd.
' Total depth ~ P.B.T.D. ~ Single, dual or triple completion? ~ If this ts a dual or triple completion,
furnish separate report for each eom-
3230 P & A p & A p~et~o..
,
Producing interval (s) for this completion R0ta~ tools used (Interval) ~ 'Cable tools used (interval)
P aA 0 - 323oI - o -
,
Was this well direcffonaUy drilled?~ Was directional s~eF madeT fil~? Was copy of dMect,9~l su~ey ] Date filed
No No .--- . --~-- ...
T~e of electrical o, other logs run (check logs filed With tho commission) ! Date filed
ES ~d M~roI Att~hed
..... CAmNS a~coao
,
Casing (report all strings set tn ~ell--conduetor, surface, Intermediate, producing, etc.).
Pu~0se Slzo hole drilled I S~ze easin$ sot Weight (lb./ft.) Depth set Sacks cement Amt. pulled
,~ ,
_ Conductor 17" ~ ~8 ~ 58 62 - 0 -
8urf~e . .. 1ORS/8" ..7-5/8 2~ . , 509 . . 130 - 0 -
· u~o ~coao None ~Ez amcoao None "
· ,. ,,.. ,. ,,.I,°''°m ,,.
,,
P~RFORAT~ON R~CORD None AC~D, SHOT, F~CTUR~, C~ENT ~QU~Z~ RECORD -
Number per fi Size & t~e Depth Inte~ Ain't. & kind of mmterlal used Depth Interval
, ,~ ......
,
,, ~, ,,, ,,, ,
, ,
' INIT~ PRODUCTION None
,, ,
Date of first production ~ Producing method 0ndiczte If flowing, g~ lif~ or Dumping--If Dumping, show size & type of Dump:)
I
bbis... ~C~ bbls. ' ~I (Corr)
, ,
Cal'ted rate of Pro- ~ Oil IGas Water ~ Oa~ll ratio
Tubing pressure Casing pressure ductton per 24 hrst bbls.. MCF bbls.
Dispositio~ of. gas- (state whether vented, used for fuel or sold): "
.
)ne
of Drilling and PrOduct_ion .
CERTIFICATE: I, the undersigned, state that I am the Manager / of the uolo~ado 0ql anct uas Corporation
(company), and that I am authorized by said company to make this report; and that this report was pre-
theParedbestUnderof mymYknowledge.SUpervisi°n and direction, and that the facts/__stated~,~, the/~i~a~,_correct~~ - and complete_ . to
Si~nat/~re ' -
Di~sion 'of Mine~ and Mindrai~
DePt. of Namr~ R~e~
_
Alaska Off and Gas Conservation Commission
Well Completion or Recompletion 'Report and Weli"~.0~
Form No. P-?
Authorized by Order No. 1
Effective October v~; 1;$8
C .
! ??
si
* Show all important zones of porosity, detail of all cores., and all drill.stem tests, including depth interval tested, cushion used, time tool open, flowing
and shut.in pressures, and recoveries.
INSTRUCTIONS:
Attach ~llers log or other acceptable log of wen.
..... h .......~ ..... u -~ ..... ~4; ......~.~ ~,4 ,~11 ln= ~h.ll h~ ~eil~] with the Alaska Off and Gas Conservation Commission not later than sixty
rage '~ OT ~_
t
R.ES~JJlJ~TS of TOC and Fi D-CARDON ANALYSES
CUTTINGS~ ,'n ON-SHORE WELLS: EASTERN GUL i" ALASKA
Well
Sullivan No. !
4210-4320
4900-4970
5560-5590
6030-6.080
6550-6610
7030-7060
7870-7930
Sullivan No' 2
iiii ii __
3600-3670
4240-4300
4700-4760
6070-6100
6600-66'50
7160-7200
7740-7790
8270-8370
9390-9,130
9910-10210
10870-10960
11600-11680
9angerous River-I
1550-1620
1810-1890
2390-2500
2980-3070
3510-3610
3990-4120
4560-4660
5090-5210
5690-5820
6300-6420
.6910-6990
7500-7590
7890-8060
8510-8610
White River Unit #2
7820-7940
8540-8740
9320'9460
9700-9860
10280-10500
10900-11020
11440-1164L
12100-12340
Yakutat No. I
6480-6640
7145-7285
7965-8155
8515-8575
9165-9295
FID-Carbon (ppm of sediment)_
Sample Total Organic
_No. Carbon si s2
4
5
6
7
8
9
10
3
4
5
6
7
8
9
lO
11
12
13
14
3
4
5
6
7
8
9
I0
11
12
13
14
15
9
I0
I!
12
13
14
15
16
.
6
7
8
9
0.52
0'.60
o. 54
0.52
0.28
o .64
0.72
· 1.02
0.64
0.77
o.~4
0.59
0.62
0.58
0.29
0.35
0.51
o.54
0.37
0.07
0.30
0.68
0.59
O.5O
0.68
0.49
0.52
O.75
0.64
0.67
0.51
0.42
0.31
0.35
0.79
o .'32
0.5O
0.45
0.6'4
0.53
0,90
0.65
2.79
1.33
0.86
1.12
FI D-Carbon
Yi el d
(% of TOE)_
S
1
Sl+ S
73 51 2.4 59
95 123 3.6 43
38 5 0.8 88
64 5 1.3 92
~5 1 1.7 98
78 1 39 3. ~ 36
6 2 406 6.5 13
48 228 2.7 17
38 86 I .9 30
29 73 1.3 29
I0 0 o.7 10o
38 59 I. 6 40
44 65 1.8 40
35 55 I .6
18 o 0.6 too
52 0 1.4 100
31 0 O.6 Io0
411 3 7.7 99
37 I 1.0 97
12 0 1.7
8 o 0.3
3 15 .0.3
7 2] 0.4
25 8 0.7
47 27 1.1
29 0 o .6
43 ' 0 0.8
67 85 2 .o
95 o 1.4
63 69 1.9
53 o 1 .o
26 o o .6
19 0 0.6
100
I00
15
24
76
64
I00
10'0
44
100
47
I00
100
100
28 I1 1. I 73
35 92 1 .6 27
38 40 2.4 49
42 46 I. 8 47
46 57 2.3 44
35 82 1.8 30
29 83 2.1 26
72 32l 4.4 18
77 5 1.3 94
89 493 2.1 15
56 273 2.4 17
22 75 Iol 23
75 1o4 1.6 42
.Pa~qe Z ot z_
i,
Well
yakutat No. '2
1980-2210
2700-2760
·3300-3390
3690-4-140
4590-4680
5310-5430
5910-6030
6480-6600
7110-7230
7740-7860
8280-8370
885o-897o
9480-9600
IOIlO-10230
10700-10790
II120-11210
11600-t1720
Yakutat No. 3 .
3150'3240
4320-4440
5110-5400
6060.62.;0
6780-6930
7590-7800
~E70-8450
8900-9050
9530-9640
10090-10220
10550-10730'
Halaspina 1-A
9090-9270
9810-9990
0560-10740
1160-'it370
1880-12060'
25t0-12750
3550-13560
3816.-13823
Core ~,~le No. :L
2390-2560
2960-3170
Core Hole N°. 2'
4520-4730
Sample
No.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2.
3
4
5
6
7
8
9
I0
11
8
9
10
11
12
13
14
15
~--~. TABLE
Fl D-Ca rbon_~ P~m
,o-c a 1 Organic S2
Carbon [TOC)_(%)_ Si
0.90
0.46
0.51
O. 40
0.37
O.l~S
0 ..45
0.44
0.59
o. 36
0.58
o.45
0.52'
0.59
o.80
0.83
0.63
147
34
10.3
28
24
88
84
1o4
169
46
66
lO7
235
125
605
766
1'02
F I D-Carbon S
Yield ---------1 o,,
(% of TOC)_ SI+ S2.
0.24
0.76
0.98
0.34
O.90
O.55
0.46
0.66
0,48
0.48
0.27
302 4.9 33
22 1.2 61
1L~S 4.9 41
] 0.7 96
ll 0.9 69
· 62 3.1 59
71 3.4 56,
I~3 3.3 71
9o 4.4 65
9 1.5 84
56 2.1 54
29 3.0 79
166 7.7 59
114 4.0 52
332 1 I. 7 65
326 13.2 70
1 3o 3.7 44
0.27
o .27
0.50
o, 44
0.26
o.19
0.51
0,73
25 o 1.0 lOO
15 5 0,3 75
85 85 1.7 50
3 0 0.I 100
6 423 4.8
9 33 0.8 21
59 I 1 I .5 84
116 121 3.6 49
69 7 1.6 91
46 0' 0.9 loo
111 6 4.3 95
0.24
0.32
47 0 1.7 100
29 0 1.1 1 O0
23 4 0.5 85
21 4O I .~, 34
51 0 1,9 100
13 0 0.7 I00
34 1 O.7 97
.
21 69 1.2 23
10 0 0..4 100
9 O 0.3 100
1 1.05 63 8:g I .4 L~3
NOTE: S1 corresponds to the quantity of hydrocarbons present in the sediment, These are
volatilized at a moderate temperature (lower than 300°C) during pyrolysis.
S2 cor. resp°nds to hydrocarbons pro. duced by cracking of the kerogen at temperatures
up to 500°C.
YAIgJTAT CORE HOLE NO. 1
Icy Bay-Cape Fairweather Area
Weekly Report of Drilling Progress for the Period May 1.8 - May 27
5 -18
5-19
5-20
5 -21
5 -22
5 -23
5-24
5-25
5 -26
Spudded in 1:00 PoM. Set 13 3/8" conductor pipe at 46' KB. Cemented
with 62 sacks Portland cement.
Drilled 10 5/8" hole to 185'.
Drilled 10 5/8" hole to 539° Ran 17 joints of 7 5/8" OD, 24~H-40, R-2,
ST&C API seamless casing (surface casing) and set at 509' KB using 100
sacks Portland cement around bottom and 30 sacks around top° Used 7 5/8"
combination float and guide shoe and two centralizers. Finished cement-
ing at 2:00 PoMo Deviation of hole zero degrees 5 minutes° Casing set
in shale. Top of shale section 260'°
WOCo Rigging up° Working on camp and trail.
Tested casing to ll00~for 15 minutes. Test 0Ko Drilled out plug at
2:00 P.Mo Top cement at 506'° Drilled from 508' to 907'° Deviation
at 907 zero degrees 50 minutes. Mud wt 8°8, vis 44. Washed out threads
in bottom of bottom drill collar° Cause: TOTCO ring plus excessive sand
in mud°
Drilled from 907' to 1496' in very soft shale with some conglomerate.
Deviation I degree at 1200'o Mud wt llol, vis 40° Bit ~4 (6 3/4") K-2P
drilled 293' in 7½ hours° Bit ~50SC drilled 296' in ~ hrs. Galled
bottom threads of second bottom drill collar°
Drilled from 1496' to 2043' in sand with conglomerate. Deviation 30
minutes at 1990'o Mud wt 11.3, vis 41, WL 14, cake 3/32. Bit ~60SC
drilled 495' in 10 hours°
Drilled from 2043' to 2449' (446') in alternating very soft shale and
conglomerate. Mud wt 10o9, vis 45, WL 10.2, cake 2/32° Bit ~7 (6 3/4")
K2P drilled 413' in ll hours°
Drilled from 2449' to 2555' in sand and shale° Mud wt 11, vis 42, WL
8.2, cake 4/32, sand 6. Deviation bullseye at 2530° Bit ~8 0SC-3
drilled 159' in 10 hours. Bit ~9 S-6 drilled 68' in 10 3/4 hours.
May 29, 1961
YAKUTAT CORE HOLE N0~ 1
Icy Bay-Cape Fairweather Area
Weekly Report of Drilling Progress for the Period May 27 - June 3
5-27
5 -28
5-29
5-30
5-31
6-1
6-2
6-3
Drilled from 2555 to 2643 (88') in thin streaks sand a!~d shale. Mud
wt 10o5, vis 43, sand 7~, WL 8°8, cake 2/32. Bit ~10 .DSC drilled 69'
in 13 hours at 8' to 10' per hour.
Drilled from 2643 to 2773' (130') in sand with streaks of shale. Mud
wt 10o7, vis 42, sand 5-5, WL 8.2, cake 2/32. Bit ~11 ESIC drilled
104' in 17 hours. Bit ~12 ESIC drilled 70' in 8~ hours. Wore hole in
7 5/8" casing just below BOPs. Welded on patch.
Drilled from 2773' to 2887' (114') in sand and shale. Mud wt 9.8, vis
45, sand 6, WL 6.2, cake 2/32. Bit ~13 ES-1 drilled 114' in 18 3/4
hours°
Drilled from 2887' to 3006' (119') in sand, shale and conglomerate.
Mud wt 9~8, vis 44, sand 5, WL 6.9, cake 2/32. Bit ~14 D-T drilled
119' in 19 3/4 hours.
Cored from 3006' to 3016 (10') recovered 1 foot conglomerate o Drilled
from 30!6~ to 3071' ~55') in sand and shale° Mud wt 9.9, vis 47, sand
5, WL 6~2, cake 2/32°
Drilled from 3071 to 3161' (90) in sand and shale. Mud wt 9.7, vis 47,
sand 4, WL 5.5, cake 2/32° Bit ~15 S-6 drilled 87' in 19~ hours. Circu-
lated hole prior to running Schlumberger. DUe to Schlumberger mechanical
trouble resumed drilling.
Drilled from 3161' to 3221' (60'). Mud wt 9.8, vis 47, sand 5, WL 5.6,
cake ~/32o Bit ~16 DT drilled 73' in 17 3/4 hours. Bit ~17 ES-lC drilled
40' in 5½ hours° S~ 3221o No correction. Ran Schlumberger IES, ML and
CDM from surface casing shoe to Schlumberger depth of 3217'.
Cored from 3221' to 3230'. Recovered 4'. Mud wt 10.2, vis 52, sand 4,
WL 5.8, cake 2/32. Set cement abandonment plug from 2440' to 2324' using
25 sacks Portland cement. Set top plug from 540' to 468' using 20 sacks
Portland cement. Started laying down drill pipe and moving out equipment.
After substructure has been removed will set 10 sack cement plug in top
of casing, weld cap on casing and install a 8' high pipe marker over hole.
P&A~ Final report°
June 9, 1961
YAKUTAT CORE HOLE NO. 1
Icy Bay-Cape Fairweather Area
Weekly Report of Drilling Progress for the Period May 18 - May 27
5-18
5 -19
5-20
5-21
5 -22
5 -23
5-24
5-25
5-26
Spudded in 1:00 P oMo Set 13 3/8" conductor pipe at 46' KB. Cemented
with 62 sacks Portland cement.
Drilled 10 5/8" hole to 185'.
Drilled 10 5/8" hole to 539° Ran 17 joints of 7 5/8" OD, 24~ H-40, R-2,
ST&C API seamless casing (surface casing) and set at 509' KB using 100
sacks Portland cement around bottom and 30 sacks around top° Used 7 5/8"
combination float and guide shoe and two centralizers. Finished cement-
ing at 2:00 PoMo Deviation of hole zero degrees 5 minutes° Casing set
in shale° Top of shale section 260'°
WOCo Rigging Up o Working on camp and trail°
Tested casing to ll00~for 15 minutes° Test OK° Drilled out plug at
2:00 P.M~ Top cement at 506'° Drilled from 508' to 907'° Deviation
at 907 zero degrees 50 minutes° Mud wt 8°8, vis 44° Washed out threads
in bottom of bottom drill collar° Cause: TOTC0 ring plus excessive sand
in mud°
Drilled from 907' to 1496' in very soft shale with some conglomerate.
Deviation I degree at 1200'o Mud wt llol, vis 40° Bit ~4 (6 3/4") K-2P
drilled 293' in 7!
2 hours° Bit ~50SC drilled 296' in 6½ hrs. Galled
bottom threads of second bottom drill collar°
Drilled from 1496' to 2043' in sand with conglomerate. Deviation 30
minutes at 1990'o Mud wt 11.3, vis 41, WL 14, cake 3/32. Bit ~60SC
drilled 495' in 10 hours°
Drilled from 2043' to 2449' (446') in alternating very soft shale and
conglomerate. Mud wt 10o9, vis 45, WL 10~2, cake 2/32° Bit ~7 (6 3/4")
K2P drilled 413' in 11 hours°
Drilled from 2449' to 2555' in sand and shale° Mud wt 11, vis 42, WL
8~2, cake 4/32, sand 6. Deviation bullseye at 2530° Bit ~8 0SC-3
drilled 159' in 10 hours. Bit ~9 S-6 drilled 68' in 10 3/4 hours.
May 29, 1961
YAKUTAT CORE HOLE N0~ 1
Icy Bay-Cape Fairweather Area
Weekly Report of Drilling Progress for the Period May 27 - June 3
5 -27
Drilled from 2555 to 2643 (88') in thin streaks sand a:ad shale. Mud
wt 10o5, vis 43, sand 7~, WL 8°8, cake 2/32. Bit ~10 .DSC drilled 69'
in 13 hours at 8' to 10' per hour.
5 -28
Drilled from 2643 to 2773' (130') in sand with streaks of shale. Mud
wt 10o7, vis 42, sand 5.5, WL 8.2, cake 2/32. Bit ~11 ESIC drilled
104' in 17 hours. Bit ~12 ESIC drilled 70' in 8~ hours. Wore hole in
7 5/8" casing just below BOPs. Welded on patch.
5-29
Drilled from 2773' to 2887' (114') in sand and shale. Mud wt 9.8, vis
45, sand 6, WL 6.2, cake 2/32. Bit ~13 ES-1 drilled 114' in 18 3/4
hours.
5-30
Drilled from 2887' to 3006' (119') in sand, shale and conglomerate.
Mud wt 9°8, vis 44, sand 5, WL 6.9, cake 2/32. Bit ~14 D-T drilled
119' in 19 3/4 hours.
5-31
Cored from 3006' to 3016 (10') recovered 1 foot conglomerate° Drilled
from 3016' to 3071' (55') in sand and shale. Mud wt 9.9, vis 47, sand
5, WL 6.2, cake 2/32o
6-1
Drilled from 3071 to 3161' (90) in sand and shale. Mud wt 9.7, vis 47,
sand 4, WL 5.5, cake 2/32. Bit ~15 S-6 drilled 87' in 19~ hours. Circu-
lated hole prior to running Schlumberger. Due to Schlumberger mechanical
trouble resumed drilling.
6-2
Drilled from 3161' to 3221' (60'). Mud wt 9.8, vis 47, sand 5, WL 5.6,
cake ~/32o Bit ~16 DT drilled 73' in 17 3/4 hours. Bit #17 ES-lC drilled
40' in 5½ hours° SLM 3221o No correction. Ran Schlumberger IES, ML and
CDM from surface casing, shoe to Schlumberger depth of 3217'.
6-3
Cored from 3221' to 3230'° Recovered 4'. Mud wt 10o2, vis 52, sand 4,
WL 5.8, cake 2/32. Set cement abandonment plug from 2.440' to 2324' using
25 sacks Portland cement. Set top plug from 540' to 468' using 20 sacks
Portland cement. Started laying down drill pipe and moving out equipment.
After substructure has been removed will set 10 sack cement plug in top
of casing, weld cap on casing and install a 8' high p~pe marker over hole.
P&Ao Final report°
June 9, 1961
L. OGATI ON: ....
~,:.,J~: ...5'-/~-~/ oo,,,,,...--,-..: ~..o,_o~,~-,-~__~,,~" .: '-.,~;,-:.'q' ..,:.,,~.-: I
bRILLING RATE .... MUD GAS
= ~.~/,~/~.~ DEPTH LITHOLOGY --~E~.A~--~O.A~ FORMATION DZ$CRIPTION
~ I i i J I i f I I I I i J I i I I ! I i i J I i, i,I i
,
,
' " ' ' - ~- i
, ,
.
,
·
·
~~ ~ ~=~ ........... ~ ~-.. ~. ~ ~, . .~ ....... , .......
t -' ' ~,
. , ;,
,, ,, ,
..
, ,
· 'i -I .i ,.
, ,
. .... ,
i " (3,~ .~ L~,::,, v.~ .......
t ~. -
i ,
i .... dUN ~ 0 19g! ..............
,
'i '~ · ~ .~ ~ ~ ,.. ~ ~ '"
I
I , ' I , I._' ,,,,l,,,, _,,,,I .... ~ ' W~¢'
,, ...... , .....
LOCATi ON= , ' , ,
~,,,,.,,:,: ~.,~ ~,. -~t oo,,,,,.,,_,--,-,-: ~,,.o,_o~,~-,-, '"~... ,,J,. ,:.^~:
, ,
, ,
DRILLING RATE · MUD GAS
I-1 MIN/¢T]~FT/MIN DEPTH LITHOLOGY --.~*.~E--~O*AL FORMATION DESCRIPTION
[
ill I i I i I I I ii I! I , ii i iii. il, ii II ...
' i "
.. -.,:=, a's ---io~..~. ,.. s,::,,',-,~., ..-sW=t\ ..-('~%
·
....
l_)lVlSion ol '",; ':~',, ':~:,:i ?;'lh~cral
.
-[,- . ,, i i,
,
~ "1
', ", r t ,
-- ~
' -~:~l.,~'
......
:- . .. __ , ,
COMPANY: 0~--i~ WELL: 9 ~- ' .... i
· .
LOCATI ON:,, '"'
DRILLING ~TE MUD GAS ' ' ·
~ ~,~/~ = ~/~,~ DEPTH' LITHOLOGY __~_~ FOR MATION DESCRIPTION
,i I I I I i I ! I I ! I I I I I I i
' ~ -' % 4
· _ ~ ,,,
~ ''
....................
.
....
, ,
--l~o .' JUN 2o 1~6'1
-__. , ......
.....
.....
., , ... k;~ ........
,, ....
" ' L+ -' ~,%X'''~
. . : ~ .
,f -.
LOCATI ON; -
/ ~ -&', / oo,,,,,,:,-E TE
SPUD:
~i: u,~ ~'~l ...... I
X~,,./~' ~ "~/~,. iDEPTH J LITHOLOGY
! ! I J J I !.
MUD GAS
--- I~ETHANE~TOTAL
.I I I I J I I I
!
!
/
!
!
t
I
1.
!
1
I
/
/
/
1
!
/
I
GEOLOGIST: J (~'~-~' C! "'""' PAGE:
FORMATION DESCRIPTION
/4"/~r'-~ __ , / "
t--
~oo^.,o.:.. /7- .~7- $~W ,,..~
,
DRILLING RATE ~ MUD GAS
~,~/~ = ~./~,~ DEPTH LITHOLOGY --~.~.-.o..~ FOrMaTION DESCRIPTION
, ~ i , I ~ i l.l , I I I ~ [ I i I I I I I I J I I I I
.... · ._ ~ ~ ,
.. .'r .........................
-~ - -ISOo ' ' '"
't " ~ O ::~ / "'
m J j~: , .~ .......................... ,,
i
· ~.~',
... .i
..
- j --
,; ....
· .. . ~
-' ~:~
.-
.,,,, .> ...
" I ' ' .~ '
-- , / .-. ,
.,1 .. t .
-~ , ,,
-~ -,' ' j ~ i
.~ - ~ ,., , , ,
/
/
/
COMPANY: ..... WELL; O ~"~'~- ' 'O ~"'&r-~, i
;
LOCATI O N ;,,,
DRILLI~ ~T'E '~ MUD GAS
~ ~,N/rT = ~T/M,N DEPTH LITHOEOGY --~,~E--TO~*~ FORMATION DESCRIPTION
....
.~ ~ .............................................................
I
1
,
.
,i
--lq.o, ~ · ~c.'~.r',~ ,~t, s. :':-'-:4t ' ' "-'-
. -- I .....~'
-.
.... / ' '~ ' =~o,3. JUN
-~ . ,, /
........ 0:~ ~'
LOCATI ON:
COMPLgTE'
FORMATION DESCRIPTION
i
MUD GAS
L l T HO LOGY -- ~'~.~,.~-~'o'r--
PAGE;
I
COMPANY:
LOCATI ON:
!sPUn -~ -t,~
G r:' OIOG I $"r| pAGE: , ~''
FORMATION DESCRIPTION
· I:
(SUBMIT. IN TRIPLICATF,)
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
Budget Bureau No. 42-R868.4.
Approval expires 12-31-4i0.
Land OH/ce_.~~ .....
!~ No. .... ~ .............
SUNDRY NOTICES AND REPORTS ON WELLS
(INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA)
Well No ...... _~ .......... is ._______ .... ft. from__ line of sec. _A.T. ......
.......... -<-~-'~%-.-~-~-~'Ei4~::i ................ '(-~:~ ............ -(-~:~ ................ ~'&~3- ..........
(Field) (County or Subdivision) (State oF TerritoF7)
The elevation of the derrick floor above sea level is ............ ft.
DETAILS OF WORK
(Stats ns. mos of and expected depths to objective sands; show sins, welghts~end lengths o~ propo0ed casings; indicate mudding jobs, lng points, and all other important propoood work)
! understand that this plan o! work must receive approval in writing by tho Gooloi4cai Survey before operations may be commono0d.
Company __~____.~_.___~_---~---__~~ ............................................................................
GPO 8 6 20 40
{$UBMIT IN TRIPLICATE)
UNITED STATES
DEPARTMENT OF THE ]NTERIOR
GEOLOGICAL SURVEY
u,d, ~_c_~....B..a. [ ..'~...a2..e...~.ai._._~e at her
Developmen'l; Contract
SUNDRY NOTICES AND REPORTS ON WELLS
NOTICE OF INTENTION TO DRill ................................. J ...... SUBSEQUENT REPORT OF WATER SHUT-OFF ....................... I.....
NOTICE OF INTENTION TO CHANGE.PLANS ....................... I ...... SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING ................ I ......
NOTICE OF INTENTION TO TEST WATER SHUT-OFF .............. J ...... SUBSEQUENT REPORT OF ALTERIN~ CASING ....................... J ..... ~
NOTICE OF INTI, jNTION TO RE-DRIll OR REPAIR WELL__ ....... J ...... SUBSEQUENT REPORT OF RE-DRIllING OR REPAIR ............... i ......
NOTICE OF INTENTION TO SHOOT OR ACIDIZE .................. J ...... SUBSEQUENT REPORT OF ABANDONMENT .......................... j ......
NOTICE OF INTENTION TO PUll QR ALTER CASING ....... : ...... I ...... $UPPL.EMENTARY WELL HISTORY ..........................................
NOTICE OF INTENTION .TO ABANDON WELL ...................... J;.,: .... ~.Q,~.~,_~,_'~_C~.]I']_~...,T,~.~,.'~t~.~O.~ ........................ J~.~...
(INDICATE ABOVE BY CHECK MARK NATURE Ofr REPORT. NOTICE, OR OTHER DATA)
C01~
We,l No.' i . is located .... ~. .... fl:. from.. ~/line and.~:~....... [1:. from l~l Ii,, o, .......... -
(~ lte~. sna B~o. No.) (T~p.) (l~a~e) (Matdl~,)
..~.g~_..~.~.._~_._~m _e__..F_.s. ~_e. ~.t..he~.. ..... ~.._a~___ ~.a_ ~.___v~__a.a .e ............................. ...~..~.~...~,. ......................
(Fl~ld) (Oount~ or ~obdi?lslon) (Btafa er 'J~e~rltory)
The elevation of the derrick flOOr above sea level is __.~3_ .... ft.
DETAILS OF WORK
(Stets names o~ and expected depths to objective sandsj show sizes, welghtl~and len8~o d proposed eaddnl~O! Indleate muddinf job~ assent-
ing points, and aH othor important proposed woeit)
1. Tiae 'above location is the correct ~ocation for our Core Hole No. 1.
e
'The location previously filed as}' approximate location~ 660'
~ of Bection i7~ T27B~ P~SE~ is incorrect.
...
A plot of the correct-location is ~ttached. O JUH ~ q ~,q~l
APPR
Ilegional Oil & ~a~ Supervisor
·
I understand that this plan of work must restive approval In writing by tho Goolofleal Survey before operations may bo commanood.,
Company .... .C_ _0_~_0__.*0-.__/~_ _. ~_._~..g..__O~._.~[.O.~ ............... : ............................ -(.). .................. : ......
......... ~ ........... ~..e.n..Y..e.T. LC..9..~.9.T...~..9 ..... : ......... :...- By ,]'. ~. Cole~ '
Title ..__.l~....~.~..~~p~ a~d ~oduction
"/7 ................... / . I ,o':/,,' ~:~. '' .... "~ Z ..... ~ "/~ ........ '~ / ' ....... ---
~udt
6-3-61 ~D 32300
5dfd)'468', 10'-0"'
APPLICATION FOR PERMIT TO~'DRILL, DEEPEN OR PLUG BACK
APPLICATION .TO DRILL ~ DEEPEN [~]. PLUG BACK
NAME OF COMPANY OR OPERA
COLORADO OIL ll~D GA~-:CoRPORATi0N~-"
Address
1~0 Denver Club BV~ 10i ~ Denver
.-~-:, -:~ "'. -~-;-' D~SCRIPTION OF WELL AND LEASE
DATE
April 18, 1961
State
Cglor-_ao
Nameof lease
Icy BaY-Cape Fair we ather ~"/z~/flp ~-~ .... ]Co..re Hole No. 1 I ~3 est.
Well location i~p~r$-x~{~~ ...... (;iv;%o;)la~e ~rom section lines) ' Section--township--range or block & survey
Sec. 17 -~S--, 3~,:'$60~f~,'~-~$~~ 1980 ~,-~og S~tio~ 17
Field & reservoir (If wildcat, so-state) . . ' ~ [ Ceunty
Core Hole, Not a ~oduction test ] ' Y~tat Vi:!~ge
Distance, in miles, and direction Yrom nearest town or post office
Seven m~les
Nearest distance from proposed location
to property or lease line:
660 (Approx.)
Proposed depth:
3,000 ft. to ~000
Number of acres in lease:
25 o
feet
Rotary or cable tools
Rotary
Distance from proposed location to nearest drilling,
completed or applted~for well on the same lease:
No we]!~ on s~_m__e lease
[Approx. date work will start
May 10; 1961
Number of wells on lease, including this well.
completed in or drilling to this reservoir'~
feet
If lease, purchased with one or more
wells drilled, from whom purchased:
Name
Address
Status of bond Covered by state wide bond for $25,000 approved by U.S.B.L.M., F~rb~_u_ks, May 6., 1959
Remarks: (If this is an application to deepen or plug back, briefly describe work to be done. giving present
producing zone and expected new producing zone)
This application is for the drilling of a core hole, not a production test.
The location shown is only approximate, as soon as a survey is conducted, an accurate
location plo~twill be filed.
of Drilling and '~oduction
CERTIFICATE: I,-the undersigned, state that I am th-]~mrl~h~~1~ /---- of the _0_0~0RADO 0TL AND GAS CORPORATION
(company), and that I am authorized by said company to make this report; and that this report was pre-
pared under my supervision and direction and that the facts stated therein are true, correct and complete to
the best of my knowledge.
Permit Number: 17'61
Approval Date: A-ril 2/4. 1961. ~
Approved By: ~.'(__~.~4~ /~~~- E-~,__
Chief~ Petrole~ Br~ch
Notice: Before send~g ~ thru form be sure that you have Wen
aH ~iormation requested. ~uch unnecessary correspond-
ence will thus be avoided.
See Instruction on Eeverse Side of Form
{Or~g~na3_ si_shed) J. R. Col.man
Signature
Alaska Oil and Gas Conservation Commission
Application to Drill, Deepen or Plug Back
Form No. P-1
Authorized by Order No. I
Effective October 1, 1958
~I~ i~ · ~ ~ i ii i i i ii · ~ i i i
/
, .
·
Il · '
·
7 8
.
~ .'
·
, ' i I I II
.
~' - ~ASE 024901
18 17 ~16
CORE ~O~ NO. I '
. E~, 84~ KB
i i ' i il i. i i : I i i Il I Il .... l
.
19 2~ 21 .
.. , ..
.
~0 . 28
.
.
.......... j . . ..
.
I I I III III I I
' ", JUN 19 19,8,1
L~ATION DESCRIPTION , U.~ GEOLO6 (.A~ SURVEY
75~ FROM N. LINE AND
1980~ FROM W. LINE
SEC. 20- T27S- R35E
COPPER RIVER MERIDIAN ~o.~o,~
5202~ FROM S. LINE
3300' FROM E. LINE OF
FEDERAL LEASE NO. 024901
ICY BAY--CAPE FAIRWEATHER