Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout160-020!¢-apfm lOjan95 LOCATION CLEARANCE REPORT State of Alaska OIL AND GAS CONSERVATION COMMISSION Memorandum To File: API No. Spud Well Name Operator Location , TD: ~6~ , Completed Note casing size, wt, depth, cmt vol, & procedure. csg: I.~T~" ~'~" ,,-~J-'/. ~ ,~',~'~'- s fo Long Csg: -~- Liner: '-- Perf intervals - tops: Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. Well head cut off: Marker post or plate: Location Clearanoe: Code Signed June 3, 1980 Mr. Joe Davidson Cities Sen, ice P. O.-Box 27570 Houston, Texas Dear Mr. Davidsc~: :, . ...... ,~..~. The foll~dng thin-secti~s of d~ .tch ...s%~p. 1.gs~ .p~.fr~u t!Te indicated w~lls w~re.-~£~ here June 3,~.198.0~: ' Colorado'Malaspina %l-A ' ] 1 section 12,990' - 12,020' .. For the record, the following sii~. ~.s ....~_r~..~ ,pared .hare 2/22/80: Colorado'-Yakue~t #3 ' 6 sections 10,060' - 10,700'. ~, ~ , * · , , · . . - . . Mark'Spanglet recently advised n~ that the balance of the thin secticns , Sincarely, William Van Alert, Petroleum Geologist February 22, 1980 Rel Acquisition of Drill. Cuttings and Core Chips for Preparation of Thin Sections Mr. Harold W. Baker Cities Service Company P. O. Box27570 Houston, Texas 77027' Dear Hals In response to our discussions this week with you, Joe Davidson and Mark Spanglet,..permission is hereby granted to Cities' Service Company to make small quantity~u~s"(approximately one cc. maximum each) from the State's set of samples and ~ores of the following wells for the purpose of preparing thin sections, subject'to the conditions set forth below~ Set No. Well Interval '10,060'~10,700' Colorado Yakutat #3 *(thin sections to b~ prepared on site at Commission office) Colorado Dangerous River #1 Colorado Malaspina #i-A Atlantic'Richfield Kavik #1 Atlantic RichfieldKavik ~2 Atlantic 'Richfield Kavik #3 Forest Kemik %1 British Petroleum Kemik #2 Atlantic Richfield W.Sak Riv.#1 Chevron Kavearak Pt. #32-25 Sohio Ugnu #1 Texaco W. Kavik I7-A 1,900'- 7,900' 40 12,990'-13,020' 240 4,250'- 4,580' 309 4,670'- 6,240' · 321 4,120'- 5,600' 299 3,560'- 8,900' 342 6,160'- 6,225' 285 3,720'- 6,680' 238 '3,700'- 7,130' 208 6,130'- 6,270' 248 13,150'-13,480' Cuts are to be made only out of those bags in which the volum~ of cuttings or core material is greater than 10 cc. No cuts are to be extracted if the volume of material in the State set is less than 10'cc. Even though the .above intervals may overlap intervals within which thin sections are currently on file in the State collection, no thin sections will be'prepared that duplicate the specific footages coverud by existing slides. CITCO will provide the State with a list of the specific sample and core footages sampled.. CITCO shall assume all costs entailed and will provide the Alaska Oil and Gas.~ Conservation Commission with a complete set of all thin sections and return all remaining sam91e and core residues. No sample or core material is to be retained by CITCO. Ail thin sections prepared from these cuts are to be received by the Commission no later than June 1, 1980. It is'mutually understood that the State's well sample library is public property'and that granting CITCO permission.to extract portions of the materials from this library for the purpose of.preparing thin sections is in the public interest.. We are pleased to work with you in this mutually beneficial endeavor and look forWard to your company's continued exercise of care and good judgement in the handling of this well material, as evidenced in the sample processing arrangements CITCOhas undertaken with the State in the past'. Very truly yours, WilliamV, n Alen Petroleum Geologist cc, '' Citco - A~ch~rage. S amp 1 e We 1 t-,- No. Yakutat No. 2 Ig80-2210 2 2700-2760 3 3300-3390 4 3690-4140 5 4590-4680 6 5310-5430 7 5910-6030 '8 6480-6600 9 7110-7230 10 7740-7860 11 8280-8370 12 8850-8970 13 9480-9600 14 10110-10230 15 10700-10790 16 11120-11210 17 11600-11720 18 Yakutat No. 3' 3150-3240 1 4320-4440 2 5110-5400 3 6060-6240 4 67'80-6930 5 ~'on 7800 6 .~z70-845o 7 8900-9050 8 9530-9640 9 10090-10220 lO 10550-10730 ' 11 Malaspina 1-A 9090-9270 8 9810-9990 9 10560-10740 10 11160- 370 11 11880-12060 12 12510-12750 13 135.50-13560 14 1.3816-13823 15 Core Hole No. 1 2390-2560 3 2960-3170 4 TABLE I (Oont.) : Fl D-Carbon (ppm t,. -I'otal Organic Ca rbon (.TOC)_ (%)_ S 1 sediment), S 2 O. 90 1 l+7 302 0.46 34 22 0.5'1 103 148 O. 4.0 28 1 0.37 24 I1 O. 48 88 62 0.45 84 71 0.44 1o4 43 'o. 59 169 90 0.36 46 9 0.58 66 56 0.45 IO7 29 0.52 235 166 0.59 125 114 0.80 605 332 0.8'3 766 326 O.63 lO2 130 0.24 25 0 0.76 15 5 0.98 85 85 0.34 3 o 0.90 6 423 0.55 9 33 0.46 59 11 o.66 Il6 121 0.48 69 7 0.48 46 o 0.27 111 6 0.27 47 0 0.27 29 0 0.50 23 4 O. 44 21 40 0.26 51 0 0.19 13 0 0.51 34 1 O.73 21 69 F IO':-Carbon ' S 1 Yield ~ (% of TOC)_ Sl+ S2 4.9 4.9 0.7 0..9 3.1 3.4 3.3 4.4 1.5 2.1 3.0 7.7 4.0 11.7 13.2 3.7 1.0 '0.3 1.7 0.1 4.8 0.8 1.5 3.6 1.6 0.9 4.3 1.7 0.5 1.4 1.9 0.7 0.7 1.2 0.2~, 10 0 0.4 0.32 9 0 0.3 Core Hole No. 2 4520-4730 ] 1.05 63 85 1.4 33 61 41 96. 69 59 54 71 65 84 '54 79 59 52 65 70 44 100 75 50 i00 1 21 49 91 100 95 100 100 85 34 100 .I00 97 23 100 100 43 NOTE: S1 corresponds to the quantity of hydrocarbons present in the sediment. These are volatilized at a moderate temperature (lower than 300°C) during pyrolysis. S2 corresponds up to 500°C.. to hydrocarbons pro. duced by crac'king of the Lerogen at temperatures Wel 1 Sullivan No. I 4210-4320 4900-4970 5560-5590 6030-6080 6550-661~0 '7030-7060 ?870-7930 Sullivan No, 2 3600-3670 4240-4300 4700-4760 6070-6100 6600-6650 7160-7200 7740-7790 8270-8370 9390-9430 9910-102t0 10370-10960'. 11600-1167~ Oa~ge rous River-1 1550-1620 1~10-1590 2390'2500 2980-3070 3510-3610 3990-4120 4500-4660 5090-5210 5~90-5820 6300-6420 6P10-6990 7500-7590 7d90-8060 8510-86t0 White River Unit #2 7820-7940 8540-8740 9320-9~60 97~0-9860 10280-10500 10900-11020 11440-II620 12100-12340 YakUtat No. I 6.480-6640 7145-7285 7965-8155 '8515-8575 g~ 9165-92.~ RESULTS of TOC and FID-CARBON ANALYSES CUTTING'S'~rom ON-SHORE WELLS: EASTERN GU of ALASKA FID-Carbon (pp,,m,,of sediment) Sample Total Organic - No. Carbon (T,0C) (%) Sl S2 4 5 6 7 8 9 lO 0.52 73 51 0.60 95 123 o. 54 38 5 0.52 64 5 0.,28 45 I 0.64 78 139 o. 72 62 406 3 4 5 6 7 8 9 10 11 12 13 14 1.02 0.64 0.77 0.14 0.59 0.62 o. 58 0.29 0.35~ 0.51 0.54 0.37 38 29 lO 38 4h 35 18. 52 31 41I 37 228 86 73 o 59 55 0 0 0 3 I 2 3 4 5 6 7 8 9 10 11 12 13 ~4 15 0.07 0.30 o.68 0.59 o.50 o.68 0.49 0.52 0.75 0.64 0 ..67 0.51 0.42 0.3.1 12 8 3 7 25 47 29 43 67 95 63 53 26 19 o o 8 27 0 0 85 0 69 0 0 0 10 11 12 13 14 15 16 0.35 0.79 0.32 o.5o 0.45 0.64 0.53 0.90 28 35 38 42 35 29 72 11 92 40 46 57 83 321 5 6' 7 8 9 0.65 2.79' 1.33 0.86 1.12 77 89 56 22 75 5 493 273 75 1o4 FID-Carbon S 1 Yield (% of TOC). SI + SZ 2.4 3.6 0.8 1.3 1.7 3.4 6.5 2.7 1.9 1.3 0.7 1.6 l.g 1.6 0.6 1.4 0.6 7.7 1.0 1.7 0.3 0.3 0.4 0.7 1.1 0.6 0.8 2.0 1.4 1.9 1.0 0.6 0.6 1.I 1.6 2 · 4 1.8 2.3 1.8 2.1 4.4 1.3 2.1 2.4 1ol 1.6 59 43 88 92 98 36 13 17 30 29 lO0 40 40 39 10o lOO lOO 97 100 I00 15 24 76 64 I00 100 44 I00 47 I00 100 100 73 27 49 47 44 3o 26 18 94 15 ~7 23 42 June 27~ 1979 Hr. Todd F. Butler o~ Exploration and Producing'Services, Inc. P,O. Box 900 Dallas,~ Texas 7-5221 Re: Acquistion of Drill Cuttings and Core'Chips for Source Rock and Palynological Analysis Dear Mr. Butler: Pursuant to our JUne 27, 1979 discussions, permission is hereby granted to Mobil Exploration and Producing Services, Inc. to make small quantity cuts ~f'..'s. ele.cted intervals from certain wells in the state's public library, of' Alaska well samples and cores for the purpose of conducting the following analyses: I. Total Organic Carbon and Pyrolysis' ("FID - C") ' 2. Vitrinite Reflectance · 3. Palynological Analysis The wells from which the small quantity sample and.core cuts are to be taken are: BP Alaska Inc. Colorado Oil and Gas l! ti gl II 11 If fl II I! II fl II Il Il II Phillips Kerr McGee II Il Il Richfield Oil Corp White River Unit 3 Core Hole I Core ttole 2 Dangerous Riv Unit I Malaspina Unit 1-A Yakutat 1. Yakutat 2 Yakutat 3 Sullivan 1 Sullivan 2 White River Unit 2 Permission for the above mentioned sampling is granted with the following provisions: a. Cuts are to be made only from those individual intervals in which the volumes of sample or core material is greater than 10cc. (no cuts are to be extracted where the volume of material in the state sample or core envelope is less than 10cc.). Mobil will provide the Commission with a list of the specific sample and core footages sampled. ~ b. Mobil is to provide the Commission with a report setting forth the results of all total organic carbon and pyrolysis analyses. This report will be released to the public. In the event Mobil voluntarily Mr. Todd F. Butler ~'~ 2 ,-'~' 27~ ~979 submits reports on the vitrinite reflectance and palynologtcal amalyses, said reports %~uld be kept confidential, if so requested. c. Mobil shall assume all costs involved and shall provide the Commission with a set of all vltrinite reflectance slides and palynological slides prepared and return all remaining sample and core residue. It is understood that all materials, analyses and confidential reports will be .received by the Commission approximately October 1, 1979., It is m~tually underst°od that the state's well sample library is public property and that granting Mobil permission to extract portions of the materials in this library for the purpose of preparing the respective slides .and conducting the above analyses is im the public interest. Very truly yours, William Van Alen Petroleum Geologist cc~ Mr. C. B. ~P.h£111p~, Expl. SuPt. Alaska Mobil E&P .Se~vice, Inc. P.O.. Box 900 Dallas, Texas 75221 Re: $ontc ~r, Cal~ 80201 aid eot con~ .~ ~t~ the Soaic~ leg of the Oangeeoas Rtver Unit ~. I ~i'1. ' '?' - .- --,.' ~eI1. ln-ceaplianoe ~tth ~ Regulatt~ IlAAC 22.535. S!ncerelY ~. - . _ . ~ ~leha A. Leversen Petrol~ GeOlogist '" f ~:~ _ WELL_COMR~TJ~.i.OR i ~RECOMPLETION REPOR-T/~'~' WELL, LOG ..... New - Work- ' ~' Gas ~ Dry Well ~ Over ~ Deepen ~ ~'Ug Same Different ~ok ~es~o~r ~ ~ O~ Rese~oir . DESCRIPTIO~ OF ~ELL AND LEASE . Operator J Address , Col0~a.d0 0ilv. and ~s-Corporation ,. J. 1000 ~nver C~ub ~.~,..~nver: Colorado Dangero~ River ~it J i j Ic~ Ba~-Cape Fai~egther Location Sec.~-Range br Block & ~urvey Count~-:-- "'" '~'~ :"' "Ll' Per~it n~be~ '"- -J 'D~te Issu~ ..... '"" --I'Pre{tous'pemt~ number Z~tat Village J ~ J ~_ ~.--o- &o J Date sRudded - ~ . · ~ J Date total de~th reach~ J Date completed, ready to J E!~v~tto~. . , J ~l~vation of ~sing ' aa 19~ ~ November 1- 1980 p~ .... ~,t J . __ . J furnish seDar~to report ~or Producin~ interval (s),or this completion ' I Rot,~ tools used (,nterv,,) !'~,,,0 No I T~e of el~trical or other logs run (check logs filed With the commission) Date filed ..... CASING RECORD AI~,.i,.~ i ~c:;t. o~ C~fng (report all strings s'et in ~ell~conductor, surface, interme~ate, producing, etc.). P~°se Size hole drilled J Size casing set ~eight (lb./f~.) Depth se~ Sacks cement ~mt. pulled - .[ Conductor 2~ [18" ID 96 7R 148 ' ~_. ~ . Size J Depth set [ Packer set at Size. Top J Bottom Sacks cement t Screen (ft.} in. ft. ft. in. i ft. ft. ' ~.~.~ PERFORATION RECORD ~O~ ACID, SHOT, FRACTURE, CEMENT SQUEEZE RECORD ~~r per iL ' Size i typo Depth Interval '' Am't; & kind of m,t~ial USO~ Depth Interval -. ,, ,, ~NrT~ PRODUCTrO~ ~one - ~e~ P~ Date of first production ~ Producing metho~ (indicate if flowing, gas lift or pum~ing~ff ~um~ing, show size & t~ of ~um~:) I . Dateof'test J Hrs. t~ted I Chokesize ] Oilprod. duringtest [ Gasproa.~i~test [ Water.prdd. duringtest I O,lg'avity bbls. : MCF bbls. ~ ~I (Corr) .... j J Carted rate of Pro- J Oil jGas J Water j Oas~il ratto Tubing pressure Casing pressure duction per 24 ~s. bbl~T . MC~. bbls. j ' Disposition oi gas- (state ~vhether' vented, used for fuel or sol~): . ~ ~ · ,, , , Manager Oz' CERTIFICATE: I, the undersiEned, state that I am th. Drlg & Pr°del me Colorado 0il & Gas Corp. (company), and that ! am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated the_r.~.i~mr~true/~rrect and complete to the best of my knowledge. . / signature j. R.~ ~o~_e[nan :--- Alaska Off and Gas Conservation Commission Well Completion or Recompletion Report and Well Log Form No. P-7 '.. Authorized by Order No. 1 ,~?.~ Effective October 1, 1958 ..)ETAIL OF FORMATIONS PENETRATEL Formation · ~' report Top logs. , Ther'e is and te~t. A descri and mu141 log. / Detain'is. c lwhich has ble. .~ Boffom Description* ~er~Wit-h"~e-'c:°~ies of the samDT':~:~lO'E'~, :m~a.'l-~g.~- electric" T~ ti ':[ .[~_.:'(': . , .... '_. [_. :'. ,_ ins~ficien space ~ere. for d~ails of ~, fq~a~ions~ cores )tmon of fo~ationg-~ ~e' T6~d '6~'th~' ~b~ch~'-:':s~ple' 1~g''~ ~ '. the: ~ill t~ test ~e noted on ghe chronologic~ ~illing_ ~n filed wi~ you; and on the ":~t~hed' ~ud 'log., "-- .... .-" '~ : . Ill I I I I I , I , I , ' ~ ' ..................................... PLUGGING'RECORD . Operator I Address Colorado 0il and Gas C0rporatio.n '11000 Denver Club Bldg.~ Denver~ Colorado Name of Lease I ~rell No. I Field & Reservoir Dangerous River UnitI 1I Icy Bay-Cape Fairw~eather . . · Location of ~Vel! Sec-Twp-Rge or Block & Survey I County 990' FNL and ,1650' FEL of Sec. l~~T29S-R37E CPMI Yakutat APPllcation't° drill this well was filed IHas this well ever I Character °f well at.cimpleti°n (initial produciion): tn name of produced oil or gas Oil. (bbls/day) Gas (MCF/day) Dry? Colorado .0il & Gas ,Cor?orationl No X Date plugged: I Totkl depth I Amount well producini when plugged: Oil (bbls/day) Gas (MCF/day) Water (bbls./day) November, l~ 1~60 8654 Name of each formation con- Fluid content of each formation Depth interval of each formation Size, kind & depth of plugs used raining oilor gas. Indicate Indicate zones squeeze cemented, w. hich formation operf to well- giving amount cement. bore. at, time of plugging ' " 8600-8500~ 5.0 SX cat. · pluggecl and aband~ ned 6850-6750~ 100 sx cat. Well , 1425-1375~ 50 sx cat. 30-O~ 20 sx cement. CASI~TG RECORD , , Size pipe Put in Well (ft.) Pulled out (ft.) Left.in well (ft.) Give depth and Packers and shoes method of parting casing (shot, ripped otc) . la" ID 7'6 . -o- 76 , ..Set at 72~ KB w/148, sx cement. · 13-3/8" OD 1379.89 -0- 1379.89 Se~ at 1394.811 KB w/490 sx cmt. . , ~Vas well filled with mud-laden fluid, according to regulations ? Indicate deepest formation containing fres~ water. Yes- , NAMES AND ADDRESSES OF .ADJACENT LEASE OPERATORS OR OWNERS OF THE SURFACE ~ . Name I Address Direction from this well: All ad~aq, ent lease, s owned l~y this ~rou~. , , , , In addition to other information required on this form, if this well was plugged back for use as a fresh water well, give all pertinent details of plugging operations to .base of fresh water sand, perforated intervaJ to .fresh water sand, name and address' of surface owner, and attach letter from surface owner authorizing completion of this well as a-water well and agreeing to assume full liability for any subsequent plug- ging which might be required. ' ~fs ~ell ~as not plugged back f, or us, e as a £resh ~ater ~ell. Use reverse side for additional detail File this form in duplicate with the Commission. Manager of CERTIFICATE: I, the undersigned, state that I am the Dr/g & Prod~ the Colorado 0il & Gas CO~Z~. (company), and that I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts stated therein are tr.m~, correct and complete to the best of my knowledge ............ ~ w~'-r'r~ tr"T~ si ' Alaska Oil and Gas Conservation Commission Plu~inE Record ,~.-~ ~-~'~.' Form No. P-15 Authorized by Order No. 1 ])i. visicu ti! [,.~;~:,es and y~ine~al~ Effective October 1, 1958. DANGEROUS RIVER UNIT NO. t Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the period November 14 - 19 11-14 11-15 11-16 11-17 11-18 11-19 Drilled to 8547' in sandstone. Mud.wt ll.2 lb/gal, Vis 62 Sec, WL 6.4 cc, cake 2/32"~ ph 805, sand 1o5~o Drilled to 8585' in sandstone° Mud wt 11ol lb/gal, vis 56 sec, WL 6.2 cc, cake 2/32", ph 8.5, sand Drilled to 8627' in sandstone. Mud wt 11.2 lb/gal, vis 64 sec, WL 6.2 cc, cake 2/32", ph 8.5, sand 1.5~, oil 5%- Drilled to 8634', TD, in sandstone. Ran IE, Micro and Dipmeter log~.o Cleaned out hole prior to DST No. 1. ~ Mud ~t 11o2 lb/gal, vis 59 sea~ -WL 6.1, cake 2/32", ph 8.5, sand 1.5%o TD 86340 DST No. 1 8578-8634, 1000' water cushion, 1" bottom choke_,~ ~ top choke, open 45 min, very weak blow thruout~ shut in 20 min. IHP 5060 psig, F~EP 5060 psig,. IFP 3750 psig, FFP 725 psig, 20 min, SIB~P 725 psigo RecOvered 50' of rat hole mud° Water used for cus thian: C1 400 PPM, Rw 38 ~56° F'o Top .of recovered fluid including cushion: C1 400 PPM~ Rw 30 ~ 79© F. Middle of recovered fluid: C1 500 PPM, Rw 33 @ 64o F. Bottom of recovered fluid, filtrate from rat hole C1 1150 PPM~ Rf 2.1 @ 65© Fo Normal for mud system: C1 1200 PPM, Rf 1o6 ~ 76o F, Rw 2.0 ~ 96© F. The flow press bled off from the initial of 3750 psig to 725 psig in approx 20 min and remained at 725 psig for the rest of the flow period. The shut in pressure was also 725 psigo The interval tested seems to be as tight as indicated~ by the drilling and logso Plug No. 1, 50 sx regular cement, 8600-8500 completed at 2:00 P.M. Plug No o 2, 6850-6750, 100 sx regular cement, completed at 3:30 P.M. Plug No° 3~ 1425-1375, 50 sx regular cement~ completed at 6~00 P.M. Began laying down drill pipe. 8~00 A.Mo Laying down drill pipe. Plug in top of casing will be put in today° The marker cannot be erected until the rig base is moved from over the well bore° Plugged and abandoned. FINAL REPORT. November 23~ 1960 NOV 28 19~0 Division oi ~'~,. i~',,~; a.~:f Minerals ~aska Dept. of fqatuzal Hesources DANGEROU~ R~V~R ~tT NO ~ 1 Icy Bay-Cape Fa~rwe~ather~. ~A~ea .Weekly Report of Drilling Progress for the period November 7 - 14 ll-8 11'~9 11-10 11-11 11-12 11-13 11-14 Dritted-~to'--8~4-~' in-sandstone° Mud wt 10o9 lb/gal, vis 53 sec, WL 6o1.~c¥ cak~ 2/32", p~' 8~5, sana Drilled to 8295 in sandstone° Deviation 8~50' 10 ~0'o Mud wt 10.9 lb/gal, vis 60 sec~' WL 5,6 cc, cake' 2/32", Ph 8.5, Sand Sritted: t'o'8301 in sandstone~ Rau .~E~---Mi-cro~ Soni¢-..and. Di~mueter logs at depth of 829~-'. Depth recorded by lOg~ 8300.'o SLM nO correction. Hud wt 10.9 lb/gal~ vis 56 sec~ WL 5°7 cc, cake 2/32"~ ph 8~5~ sand Drilled to 8362' in sandstone° Mud wt 10o9 lb/gal, vis 57 sec, WL 6.1 cc, cake Drilled to 8415 in sandstone. Mud wt 11.O lb/gal, vis 58 sec, WL 6°2 cc, cake 2/32", ph 8o5~ s~nd to5%. Drilled to 8465 in sandstone° Mud wt Zlol lb/gal~ vis 63 sec, WL 6~3 cc, cake 2/32"~ ph 8~5~ sand 1o5'~, oil2~ .... Drilled to"8508' in sandstone° Mud wt 11ol lb'/g~t, vis 67 sec, 6.4 cc~ cake 2/32", P'h"8~5, .sand 1~5~ ~i~ .~%o 8:00 AoMo Drilling at 8521' in sandstone. ,/ November i8~ 1960 DANGEROUS RIVER UNIT NO. 1 IcY Bay-cape Fai~e~ather Area Weekly Report of Drilling Progress for the period Oct. 31 - Nov. 7 10~31 11-1 11-2 11-3 11-4 11-5 t1'6 11-7 Drilled'to '7977-'"in 'sandstone. Mud'wt 10.7 lb/gal, vis 6 7.0 cc-, cake 2/32", p~ 8~5~ san~ ~, oil .Drilled"to 8005' 'in"sandstone, '-Mud wt 10.6 lb/gal, vis 51 sec, WL 6;6 c'c, cake` 2/B2", ph ~. 5-, sand 1.5~, Oil" 4%. Drilled 6,9 cc, Drilled 6.9 Drilled · to 8040.' in sandstone.-MUd wt 10.9 lb/gal~ Vis 54 sec, WL cake 12/32", ph 8.5, sand 1.5%' oil 8%. to 8073'-in-sandstone. Mud wt 10.9 lb/gal, vis 54 sec, WL cake 2/3F', ~ 8.5, sa~ z.5%. .. ~ $t10 in sandstone. Mud wt 10.9 lb~l, ~s 65 sec,~ ca~e' 2/32", ph~ 8~ 5, sand- 1.5%. Drilled"to':~O!46'-'in sandstone. .Mud wt 10.9 lb/gal, vis 66 sec, WL 6.3.cc, /cake' '2/32", p'h 8.5, sa~d 1.5%- Drilled-to 8204' in sandstone. Mud wt 10.9 lb/gal, vis 48 sec, WL 6.'3 c'c, cake 2/32", ph 8.5, sand 1.5%. 8:00 A.M. Drilling.at 8220,' in sandstone. November 11, 1960 DANGEROUS .RIVER UNIT NO. 1 I¢.y. ~B~ y,C.a, pe F~a.i~r_weather Area Weekly Report of Drilling Progress for the period Oct. 25 - Oct 31. 10-25 10-26 .10-27 10-28 10-29 lO-3O 10-31 Drilled to 7715' in sandstone, siltstone and 'shale. Mud wt. 11.1 lb./gal., vis 52 sec.,.WL 6 cc cake 2.32", pH 8.5, sand 1.5%. Drilled to 7768' in sandstone, siltstone and shale. Mud wt. ll.2 lb./gal., vis 58 sec., WL 6.4 cc, cake 2/32", pH 8.5, sand 1.5~, oil 3%. Drilled to 7831' in sandstone, shale and siltstone. Mud wt. 11. lb./gal., vis. 63 .sec., WL 6.4 cc, cake 2/32", pH 8.5, sand oil 5~. Drilled to 7885' in sandstone. Mud wt. ll.1 lb./gal., vis 61 sec.~ WL 6.3 cc, cake 2/32", pH 9.5, sand 1.5~, oil 4%. Drilled to 7931' in sandstone. Mud wt. 11 lb./gal., vis. 59 sec., WL 6.5, cc, cake 2/32'", pH 8.5~ sand 1.5%, oil 4%. ~ 8 A.M. Coring at 7937', core No. 6 frmn 7931'. Now preparing to pull core. When pulling .out of hole, drill string stuck at ~2517' (bit). Could not pull free with 50,000 lbs. above weight of pipe. Knocked pipe free, down the hole .with 'Shaffer-Waggener bumper sub. Worked pipe up through 90' of tight hole. Reamed tight hole section. Drilled and cored to 7951' in sandstone. Core No. 6 7931'-7937', no recovery. Core .No. 7 7937'-7951', recovered 13' of hard sand- stone. Mud wt. 10.5 lb./gal., vis. 46 sec., WL 6.5 cc, cake 2/32", pH 8.5, sand 1.5~. 8 A.M. Reaming core hole at 7942', depth 7951'. November 4, 1960 NOV ? 1960 Oil & Gas Section Di~:ision of biine$ and MineraL, Aiaska Dept. of Natural B. esource~ DANGEROUS RIVER UNIT NO, 1 Icy` Bay~'ape F'a~irw'eather Area Weekly Report of Drilling Progress for the period Oct. 18- Oct.. 25. lO-18 lO-19 10-20 10-22 lO-23 10-24 ~ 10-25 Drilled -to 7423' in sandstone. Mud wt. 11.3 lb./gal., vis. 53 sec., W]4 5.5 cc, Cake 2/32", pH 8.5, sand 1.5%. Drilled to 7463' in shaley sandstone. Mud wt. 11.12 lb./gal., vis 50 2 2" · sec., WL 6.1 cc, cake /3 , pH 8.5· sand 1.5%, oil Drilled to 7498' in sandstone, siltston~ and shale. Twisted off drill collar pin, 6-1/4" drill collars, at 7498' leaving 4 collars in hole. Recov. ered collars with overshot. Mud wt. ~ll. 3 lb./gal., vis. 59 sec., WL 6 ~cc., cake 2/32", pH 8.5, sand 1.5~, oil 3~. Drilled to 7553' in sandstone, siltstone ~and shale. Mud wt. 11.1 lb./ gal., vis. 52 sec., WL 6 cc~ cake 2/32", pH 8.5, sand 1.5%, oil 3~. Drilled to 7587' in sandstone with shale and siltstone. Mud wt. 11.3 . . ~ · 2 lb /gal , vis 50 sec. WL 6.1 cc cake /32 , pH 8.5, sand 1.5%, oil Drilled to 7625 in sandstone, siltstone and shale. Mud .wt. 11.2 lb./ gal., vis. 56 sec. WL 5.9 cc, cake 2/32 , pH 8..5, sand 1.5%, oil 4%. Drilled to 7663' in sandstone, siltstone, and shale. Mud wt. 11..2 lb./gal,, vis 59 sec., WL 6 ce, cake 2/32", pH 8.5, sand 1.5%. Drilling at .7685in sandstone~ siltstone and shale at ,8 A.M. October 28, 1960 p, laska De~t. oE Natura~ Resources DANGEROUS R~ WIT NO. 1 Icy Bay-Cape Fairweather Area . _ L ' '. _ . _ J ] . Weekly Report of Drilling Progress for the period Oct. ll - Oct 18 lO-12 lO-13 10-14 lO-Z6 lO-17 10-18 Drilled to 7~8' in sandy siltstone and shale. Mud wt ll.6 lb/ gal., vis. 50 sec., WL 5.8 c.c, cake 2/32"~ ~.H 8.'5, sand Drilled to 7151' in sandy siltst0ne and shale. Mud wt ll.6 lb/ . . 2 2" pH 8.5, sand 1.5~. gal., vis 54 sec ~ WL 5 7 cc, cake /3 Drilled to 7185" in ,sandstone, siltstone and shale. Mud ll. 5 lb/gal., vis. 50 sec.,. WL 5.6 cc, cake 2/32", pH 8.5, sand z. oil Drilled to 7221i in shaley, Silty sandstone. Mud wt ,11.3 Zb/ gal., via 53 ~seC., WL 5.8 cc~ cake 2/32", pH ~8.5, sand Drilled to 7~64' i.n sandstone. Mud wt ll. 3 lb/gal. ~ vis.. 55 sec., WL 5.7.ec, eke ~/32"~:pH 8.5, sand 1.5~. Drilled to 7~98i'in .sand~tone, Mud wt ~.2 lb/g~., Vis. 54 sec , WL 5 4 cc~ c~e ~ ~'" . · · 2/3~ ~ pH 8.5~ sand i 5%- Drilled to 73~' in San~ton~. Mud wt ,11.2 lb/gal.~ vis. 56 sec., WL :5.5 cc, cak~ ~/32", pH 8.5, sand 2%. 8:00 A.M., drilling at 7377' in ~sandstone. October ~ 1960 ECEIVED OCT 24 1980 Oil & Cas Section Division of lA, li.~e~ and }¥1inerals Alaska Dept. of Natural Resources DANGEROUS RIVER UNIT NO. 1 ICY Bay-C~pe Fairweather A.rea . Weekly Report of Drilling Progress for the period October 4 - 11. 10-4 10-5 10'6 10-7 10-8 10-9 10-10 10-11 Drilled to 6881' in sandstone, shale and siltstOne. Mud wt 11.9 lb/~l, vis 59 sec, WL 5-3 cc, cake 2/32", ph 8.5, ~1,5~. Drilled to 6920' in sandy shale. Mud wt 11.7 lb/gal, vis 56 sec, WL cc, cake 2/32", ph 8-5, sand Drilled to 6967' in sandy siltstone and shale. Mud wt 11.9 lb/gal, vis 55 sec, WL 5-9 Cc, cake 2/32", ph 8.5, sand 2%. Drilled to 7004' in sandy shale and siltstone. Mud wt 11.7 lb/gal, vis 57 sec,.WL 5-7 cc, cake 2/32", ph 8.5, sand 2%, oil 4%. .Drilled to 7047 in shaley sand- Deviation.: 7030 - 1© 30'. Mud wt 11-~7 lb/gal, vis 48 sec, WL 5.7 cc cake. /3 , ph 8.5 sand 2%, oil 3%. Drilled to 7066' in shatey Sand. Twisted off drill collar pin at depth 7052' leaving ll drill collars in hole. Recovered collars with overshot. Mud wt ll.7 lb/gal, vis 50 sec, WL 5.8 cc, cake 2/32", ph 8.5, sand 2%,~ oil 3¢. Drilled to 7097' in sandy siltstone and shale. Mud wt 11.6 lb/gal, vis 49 sec, WL 6.1 cc, cake 2/32", ph 8.5, sand 1.5~. 8:00 A.M. Drilling.at 7109' in sandy siltstone and shale. October 14, 1960 R CE VED ....~.~.,~.~ OCT 17 Oil & ~,~,, o ,. Division o~. ~.,t.''° oc'cr~on · " . i'roes d Minerals Ai~ka Dept o~ DANGEROUS RIVER UNIT NO. 1 Icy BaY.,,Cape Fairweather Area Weekly Report of Drilling Progress for the period 'RECEIVED 0 'i' 10 Oil & Cas Section Division of Mi~es and Minerals 9-26 9,-27 9-28 9-29 9-30 10-1 10-2 10-3 10-4 Drilled to 6702' in sandy siltstone. Mud wt 12.2 lb/gal, vis 52 sec, WL 5.2 cc, cake 2/32", ph 8.5, sand 1o5~,. Drilled to 6719' in sandy siltstoneo Twisted off drill collar pin, leaving 8 7 3/4" drill collars in hole. Went in hole with overshot and Shaffer-Waggner safety joint bumper sub. Latched ont'~,?.fish, had 10~ return of circulation (fish plugged), fish stuck, passi~htY' puXled fish up hole 2'. Fish became completely plugged, c~hld not circulate at 2000 psigo Pulled up l~i~ points on indicator above weight of free pipe, could n~t move fish° Released fish and circulated for 30 min. Latched onto ~:.ish but could, not move it.. Released fish and pulled out of hole. 'Mud wt 12~2 lb/gal, vis 52 sec, WL 5~3 cc, cake 2/32", ph 8°5, sand 1,5 , oil 3¢° Went in hole with overshot~ Baash-Ross bumper sub, McCullough jars, Shaffer-Waggne~ safety joint bumper sub, 2 7 3/4" drill collars. Latched onto ~[sh, could not mo~e fish after jarring for 3 hours. Re- leased fish an2 circulated for 30 mino Latched onto fish, jarred for 1½ hours but cbu!d not move fish. Jars operated at 200 tons~ Released fish, circu!at,~d for 7 hours, waiting on washover tools° Ran 6 joints~ 251~, of 9 5/8~' casing for wash pipe. Washed over stuck drill collars t.o top of bit ~7~7o The only part that required weight was 6710-6717' which was only fairly hard. Pulled wash pipe out of'~ole. Drilled to 6729. Went in hole with overshot and jars~ Latched onto fish, required 1~5 points On indicator above weight o~ free pipe to pull fish freei~ Pulled fish out of holeo Went in ho[e with bit, reamed 6670-6719o Drilled in silty sandstone, hard° iMud wt 12'1 lb/gal, vis 51 sec, WL 5 cc, cake 2/32", ph 8.5, sand 2%. .Drilled to 675~' in silty sandstone, hard. Mud wt .12,t tb/~al, vis 50 sec, WL 50 cc, cake 2/32", ph 8°5, sand Drilled to 6787' in silty sandstone° Mud wt 12o2 lb/gal, vis 60 sec, WL 4°9 cc, cak~ 2/32", ph 8°5, sand 1o. 5%, oil Drilled to 6824~ in sandy siltstone and shale° Reduce~ hole size from. 12~~'' to 8' 3/4"' at ~787'. Mud wt laol lb/gal, vis 58 sec, WL 4.9 cc, cake 2/32',', ph 8.5, sand' 1.5~. .Drilled to 683.~' in sandy siltstone and shale° Twisted off drill collar pin leaving 8 collars in hole. Recovered drill collars with overshot. Mug: wt 12.0 lb/gal, vis 51 sec, WL 4.9 cc, cake 2/32", ph 8o5~ sand 1,5~. 8~00 A.M. Drilling 6857' in sandy siltstone and shale, Now drilling with 12 .6~" drill collars, 12,000 lbs indicator weight on bit and 75 rpm rotary table speed. October 7, 1960 , DANGEROUS .RI-VER .UNIT NO. 1 Icy Bay-Cape Fairweather Area Weekly Report o£ Drilling Progress for the period September 20 - 26" 9-20 . , Drilled to 6408' in sandy sil~'stoneo Mud wt 11.9 lb/gal, vis 54 sec., _WL 5.3 cc, cake- 2/'32', ph 8- 5, 'sand t. 5~. · "9-~l Dr±lted"to"'64~5' in sa~ty siltst'oneo Core No. 5 '6'431-39, r~c°vered 6,5~ of'~shate'and sandy siltstone. Mud wt 12 lb/gal, vis 55 sec, WL ~ 5-3 cc, cake' 2/32"~ ~h 8'5, s~nd to5~ 9-22 Drilled to 6505' in sandy siltstoneo Mud wt 12 lb/gal, Vis 55 sec, WL 4°7 cc, cake 2/32", ph 8.5, sand 2~o 9 '23 Drilled to 6'524' in sandy siltstoneo Ran IES, Micro and Dipmeter logs at 6505'. SIAM, no correction° Mud wt 11.9 lb/gal, vis 52 sec, WL 5.2 cc, cake 2/32", ph 8o5~ sand 9-24 9-25 9-26 Drilled to'~6'582' in sandy siltstone° Deviati'o~: 6580' 1© 00~° Mud wt' t2.0 lb/gal, vis 50 sec5 Wt~ ~5o3 cc, cake 2/32", ~h' 8.5, sand Drilled to.6650~ in sandy siltStone. Mud wt 12.1 lb/~l, vis 51 sec, ~ 5-4 cc, cake 2/32", ph 8-5, sa~d 8:O0 A.M. Drilled t'o 6672~ in sandy siltstone. SePtember 30, 1960 DANGER.S RI~ UNIT NO. 1 Weekly Report of Drilli~ Progress: f:or the period SePtember 13 - 20 9~13 9-15 9-16 9-18 9-19 9-20 Drilled to 5923' in siltstone. Mud wt 11o9 lb/gal, vis 55 sec, WL 5.6 cc, cake 2/32"' ph 9, sand 2~, oil 5~- Drilled to 6000' in' sittstone. Mud wt 11.9 lb/gal, vis 52 sec, cake 2/32", sand oil Dr-i-tied to 6051' in shale° Deviation: 6035' 0© 50' · Mud wt 12 lb/ gal, vis 57 sec, WL 4°8 cc~ cake 2/32, ph 8.5° Drilled to 6i22' in Shale° Mud wt t2 th/gat, vis 53 sec, WL 4°.7 cc, cake 2/32", ph 8.5, sand Drilled .to 6187' in shale, Mud wt 12.2 lb/gal, vis 56 sec, WL 4.9 clc, cake 2/32", ph 8.5, sand 2%o Drilled :to 6243 in shale. Mud wt 12 lb/gal, vis 51 sec, WL 5.1, cake 2/32", ph 8.5~ sand 2%° Drilled .to 6319' in sandy shale. Mud .wt 11.9 lb/gal, vis 47 sec, WL 5~5 cc, cake 2/32"~ ph 8.5, sand 1.5%- 8:00 A.Mo Drillingat 6356' in sandy shale. September 23' 1960 RECEIVE'l) SEP ].980 Oil & Gas Section Division of Mines and Minerals Alaska Dept. of Natural Resources DANGEROUS RIVER UNIT NO. 1 Icy 'Bay-C~Pe. F~a~ea~her Area 'W~ekly Report 'of Drilling Progre~-s'-'£or-tke'l~eriod .S~p't~mber 6 - 13 9-6 9-7 9~8 9-10 9-11 9-13 Drilled~to 5416' in silt4stone. Core No~ 4 Informational, 5399-5412, r.~covered ll'--of siltstoneo Mud wt ll~6 lb/gal, vis~ 53 sec, WL 6°6 cc~ cake 2/32"~ ph 8, sand 2o5%o Drilled'to 55t5' in silt'stone. Mud ~ 11.6 lb/gal, vis 48' sec, 6.5- cc, cak-e a/~"~ p~' 8-.5, o±l 5¢, s~nd Drilled-to--'559t-' iu--'sittstoue:o Mud wt 11o7 'tb'/~at, vis 54 ssc~ WL 6.4"cc, cake 2/32", ph 8~5~ sand ~'5%~ ~--Had tiEht hole at 5446' when pulling'out on trip'. At same point~ hole was tight when going in hole~ took 140~O00 lbs above' normal '~eight to'pull loose. This ~secti'on~of hole-h~s been reamed out with bit. -Now pulling up 5 stands' every '5 hrs~ Section .of hole at 5446~ does not' now seem tight on pull ups or trips. Drilled'to '56t8'-in 'sittstone. Mud wt 11o7 lb/gal, vis 58 sec, WL 6~3 cc'~ cake' 2/3'2"~ ph' 8o5, sand ~5~. Drilled to 571.6'~ in siltstone. Mud wt 11.7 lb/gal, vis 52 sec, WL 6.2 cc~ cake Drilled to 5794' in siltstoneo Mud wt 11~8 lb/gal, vis 52 sec, WL 6.1 cc, cake 2/32", ph 9, sand 2'°5~ Drilled to 5855' in siltstone. Mud wt 11o9 lb/gal, vis 55 sec, WL 5.6.cc, cake 2/32", ph 9~ sand 2~o 8:00 A.M. Drilling ab 5881' in siltstoneo September 16~ 1960 DANGEROUS RIVER UNIT NO. 1 Bay-Cape Fai~w~a%hSr Area Weekly Report of Drilling Progress for the period August 30 - Sept 6 8-30 8-31 9-1 9-2 9-3 9-4 9-5 9-6 Drilled to 5096' in hard siltstone. Drill pipe pin JumPed out of croas- o~er sub on top of drill collars leaving 4 drill collars in hole. Recov- ered drill collars with over-shot and Baash-Ross bumper sub, had difficulty getting over fish. Fish was tight in hole, required 50,000 lbs to pull it free. This is the first indication hole is not in excellent condi~iono Mud wt 12.2 lb/gal, vis 48 sec, WL 6.9 cc, cake 2/32", ph 8..5, sand Drilled to 5146' in hard siltstoneo Mud wt 12°0 lb/gal, vis 45 sec, 6.4 cc, cake 2/32", ph 8.~5, sand 2o5~, oil 2~, solids .23.~, water 75~o 25 bbls diesel oil added to mud. Drilled .to 5191' in hard siltstone° Mud wt 12.0 lb/gal, vis 48 sec, ~L 5.8 cc, cake 2/32"~ ph 8~5, sand 2~o Drilled to 5234~ in sandy siltstone. Mud wt 11.7 lb/gal, vis 55 sec, WL 6.6 cc, cake 2/32", ph 9~ sand 2o5~o Drilled to 5271' in silty 'sandstone. Mud wt 11.7 lb/gal, vis 51 sec, 6.7 cc, cake 2/32", ph 8..5, sand Drilled to 5317" in silty Sandstone° Mud wt 11o6 lb/gal, vis 63 sec, WL 6.3 cc, cake 2/32", ph .8~5, sand Drilled to 5374' in silty sandstone° Mud wt 11o7 lb/gal, vis 53 sec, WL 6°3 cc, cake 2/32", ph 8.5, sand 2~. 8~00 A.M. Drilled to 5400 in sandy siltstone, now circulating prior to taking informational core, no shows. September 9~ 1960 RECEIVED Alaska Dept, of tNatutal Resources DANGEROUS RIVER UNIT N0' 1. Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the period August 22 - August 30 8-22 Drilled to 4701' in sandy siltstone. Deviation: 0© 50' at 4639. Mud wt 12.2 lb/gal, vis 48 sec, WL 6.7 cc, cake 2/32"~ sand 3o5~, ph 9~ 8.-23 Drilled to 4764' in sandstone and siltstone. Mud wt 12.2 lb/gal, vis 59 sec, ~WL 6.0 cc, cake 2/32", ph 9~5- 8-24 --~Drilled to 4807' in hard sandy siltStone. Mud wt 12.2 lb/~at, vis 59 sec, WL 6.8 cc, cake 2/32", ph 9, sand 8-25 Drilled to 4841' in hard sandy siltstone. .At a depth of 4832' a d~ill collar pin twisted off, three drill collars were left in ho-l'e. Drill collars recovered with overshot and. Baash-Ross bumper sub. Now dhrill- ing with 4 7 3/4" drill collars and using 12,000 lb on bit. Mud wt 12..1 lb/gal, vis 48 sec, WL_ 6o3 cc, cake 2-/32", ph 8.5, sand 3~- 8-26 Dr. il&ed to 4886' in ~: siltstone. Mud wt 12°1 lb/gal, vis 64 sec, 2 2" ph~9~ sa~td 3~~ WL 6..4 cc, cake /3~.! ,. 8-27 -Drilled to 4946~ in har-d' siltstone. Mud wt 12.2 lb/gal, vis 57 sec, WL 6.6 cc, cake 2/32", ph 9, sand 3-5~. 8-28 Drilled to 5014' in sittstoneo .Deviation: 5014 0© 30'. Mud wt 12.2 lb/gal, vis 53 sec, WL 6..4 cc, cake 2/32", ph 8.5, sand 3~° 8-29 .Drilled to 5067' in hard siltstone~ Mud wt 12.2 lb/~al, vis 48 sec, WL 6°7 cc, cake 2/32", ph 9~ sand 2o5~o 8-30 8:00 A.M. .Drilling at 5087' in hard siltstone° September 2, 1960 SEP 6 !960 Oil Division Alaska Dept. DANGEROUs RIVER UNIT NO. 1 Icy Bay-Cape Fairweather Area Weekly Report of Drilling Progress for the period August 15 - August 22 8-15 8-16 8-17 8-18 8-19 8-21 8-22 Drilled to 4188' in siltstoneo Ran IES~, Micro, and Dipmeter logs.; depths recorded by logs~ 4181o SLM~ no correction° Mud wt 12.2 lb/ gal~ vis 52 sec,~WL 6°4 cc, cake 2/32"~ ph 9, sand 2%. Drilled to 4254' in siltstoneo Mud wt 12o2 lb/gal, vis 56 sec, WL 6.6 cc~ cake 2/32"" Ph 8o0~ Sand 3o5% Drilled to 4344' in siltStone. Mud wt 12ol lb/gal, vis 50 sec, cake 2/32",~ph 8.5, sand 3%o Drilled to 4412' in sandy siltstoneo Deviation: 0© 50' · Mud wt 12o2 lb/gal~ vis 55 sec,~WL 6°9 cc, ~cake 2/32", ph 9, sand 3.5%° Drilled to 4498' in sandy siltstone. Mud wt 12o2 lb/gal, vis 56 sec, WL 6o8 cc, cake 2/32" ph 9, sand 3%o 'Drilled to 4558' in sandy siltstone. At a depth of 4339' a drill collar pin twisted off, 4 drill collars were left in hole. The 4 drill collars were recovered (first run, first try) with overshot and Baash-Ross bumper sub° . Now drilling with 6 7 3/4'' drill collars and using 15,000 lbso on bit° Drilled to 4636 in silty sandstone. Mud wt 12.1 lb/gal, vis 47 sec, · WL 7°0 cc, cake 2/32", ph 9o0, sand 3.5%. 8:00 A.M. Drilling at 4650 in silty sandstone. August 26, 1960 'RECEIVED OJ] & Gas $cct;o~. Division oF ~?vlincs a~',d h,'iinerals ~asl~a De~t. of Natural ~e~urces DANGEROUS RIVER UNIT .NO. 1 Icy Bay-Cape .i~4irweather Area Weekly Report of Drilling iProgress for the period August 9 - August 15 8-9 8-10 8-11 8-12 8-13 8-14 8-15 Drilled to 3681' in siltstone and "marl" (a slightly calcerous white Clay), sample top of "marl" 3670° Mud wt 12o2 lb/gal~ vis 51 sec, WL 7ol cc, cake 3/32, ph 9°5, sand 4%° Drilled to 3782' in sandy siltstoneo Mud wt 12o3 lb/gal, vis 54 sec, WL 6°9 cc, cake 2/32", ph 9°5, sand 4~. Drilled to 3842' in siltstone. ~Deviation: 3808' 0° 45'. Mud wt 12o3 lb/gal~ viS 53 sec, WL 7.0 cc, cake 2/32", ph 9.5, sand 4%o Drilled to 3903' in siltstoneo Mud wt 12.3 lb/gal, vis 53 sec, WL 6°3 cc, cake 2/32", ph 9°5, sand 305~o Drilled to 4006' in siltstone. Mud wt 12.1 lb/gal, vis 52 sec, WL 6°9 cc, cake 2/32'', ph 8°5, sand 3%o Drilled to 4129' in siltstoneo .Deviation: 4067' 0° 20'. Mud wt 12o2 lb/gal, vis 55 sec, WL 6°6 cc, cake 2/32", ph 9°0, sand 2°5%° 8:00 AoM..Drilling.at 4164' in siltstoneo .August 19, 1960 AUG 16 DANGEROUS RIVER UNIT NO~ ..~, Oil & Gas Section l)ivision o[ Mines and Minerals Dept. ot~ Natural gesource~ Weekly Report of Drilling Progress for the period August 2 - August 8 8-3 8-4 8-¸5 8-7 8-8 / Drilled to 3190' in siltstone. Mud wt 12.6 lb/gal, vis 50 sec, WL 7.4, cake 2/32, ph 9.5, sand 4%. Drilled to 3270' in siltstoneo Mud wt 12.3 lb/gal, vis 48 sec, WL 7.2 cc, cake 2/32, ph 9.5, sand 3.5%. Drilled to-3357' in siltstone. Mud wt 12.4 lb/gal, vis 54 sec, WL 8 ce, cake 2/3.2, ph 9.5, sand 4%. Drilled to 3413' in stiltstone. Mud t2.5 lb/gal~ vis 59 see, WL 8.0 ce, cake a/39-, ph 9.5, sand 4%. Drilled to 3476 ' in siltstone. Deviation: 3440 ' -- lO1 ~O1 ' Mud wt 12.5 lb/gal, vis 63 sec,.WL 7.4 cc, cake 2/32, ph 9.5. Drilled to 3555' in siltstone. Mud wt 12.4 lb/gal, vis 49 sec, WL 7.1 cc, cake 2/32, ph 9.5, sand 4%. Now drilling with 8 - 7 3/4" DC, using 15~000 lbs on bit. Drilled and cored to 3612'. Core No. 2 (informational), 3594-3602, recovered 0.25' (3"), silty fine grain sandstone. Core No. 3 (informational), 3602-3612, recovered 10' silty fine grain sand- stone. Mud wt 12.3 lb/gal, vis 50 sec, WL 7.4 cc, cake 2/32, ph 9-5, sand 4%. August 12, 1960 DANGEROUS RIVER UNIT NO. 1 ..I.?y Bay,Cape Fairweather' '~ea RECEIVED AUG 8 1960 Oil & Gas Section 'Division of Mines and Minerals --4kbska Dept. of Natural Resources Weekly Report of Drilling Progress for the period JUly 26 - August 1 7-26 7-27 7-29 7-30 7-31 8-1 Drilled to 2614' in siltstoneo Mud wt ll.7 lb/gal, vis 48 sec, WL 6.3 cc, cake 2/32", ph 10, sand 3%- Drilled to 2685' in siltstone. Mud wt 11o9 lb/gal, vis 55 sec, WL 6°8 cc, cake 2/32", sand 3%, ph 10.5o Drilled to 2742' in siltstone and sandstone. Core ~l (Informational) 2715-2725, rec 10' of siltstone and sandstone. Mud wt ll.8 lb/gal, vis 51 sec, WL 6.0 cc, cake 2/32", ph 10, sand 3%. Drilled to 2821 in siltstone. Mud wt 12.3 lb/gal, vis 56 sec, WL 6 cc, cake 2/32", ph 10, sand 4%0 Drilled to 2916' in siltstoneo Deviation: 2909' - 1° 00'. Mud wt ~12.6 lb/gal, vis 48 sec, WL 6.7 cc, sand 3%, ph 9.5. Drilled to 3008' in siltstoneo Mud wt 12.8 lb/gal, vis 57 sec, WL 6o8.CC, cake 2/32", ph 10, sand Drilled to 3099~ in siltstoneo -.Devistion: 3088' - 1° O0~. Mud wt 12o6 lb/gal, .vis 54 sec,. WL 7.1 cc, cake 2/32", sand 5%, ph 10o AugUst 5, 1960 July 29, 1960 DANGEROUS R~ER ~IT NO. 1 ' _ ,, · ~, ,., 1 ~ , u ,' , , ~ ;,,,, , !_cy .,~Ba. y~ape..Fairweathe~ Area Weekly. Report of DriVing .Progress for the Period July 19 - July 25 7-19 7-20 7-22 7'2~ 7-25 Drilled ~to 20~2 in ~hard sandstone and shale. Deviation: 2033' 0 ~eg. 15"~. Mu~: wt 11.8 ih./gal., vis. 51 sec., WL.91.1 cc~ cake 2/..~.", pH 9.5, san~ ~. Drilled to 2126 in siltstone with sand. Mud: wt. 12.1 lb./gal.~ vis. 48 sec.~ WL ~9.4 cc, cake 2.32", sand 4%, pH.9.5. Drilled to 2208 in siltstone. Mud: wt. 11.9 lb./gal., vis 62 sec., WL .9..6 ce, cake 2/3S", pH .9- 5, sana Drilled to 2327 in siltstone. Deviation: 2281' 0 deg. 45 ' · Mud.: wt. 11.9 ib./gal.~ vis..55 sec., WL 10.4 cc~ cake 7.5 sa d 3.5 . Drilled to 2~$6 in .hard siltstone. Mud: wt. 11.7 lb./gal., vis 42 sec., WL .9~6 cc~ cake 2/32", pH 8, sand S%. Drilled to 2488 in hard siltstone. Mud: wt. 12 lb./gal., vis. 47 sec., WL .9 cc.~ cake 2/32", pH ~9, sand 3~. Deviation: 2464' 0 deg. 50'. Drilled to 2542 in hard siltstone. Mud: 11.9 lb./gal., vis 64 sec., WL 6~1 cc, cake 2/32", pH 10, sand 3.5~- moo Oil a Gas Section '~;on o~ Mines and Mine~[§ Dept. _ot~ Natural Bemu~gg~ R CEIVEd :: JUL ;~6 Oil & Gas Section Division of Mines and Minerals Alaska Dept. of Natural Resources July 22., 1960 DAN~0US.R~ER MIT ~0o 1 Weekly Report of Drilling Pr:ogress for the Period July 12 - July 18 7~2 7~i4 7~15 7:~17 7~18 Drilled to 11178 in very hard~ dense san&stone. Mu&: wt. 11..5 lb/gal.., vis 4-5 sec., WL 16,.5 cc, cake ~./~:", sand Drille& to 1513 in very hard~ ~nse sandstone. Mu~: wt. ll~7 lb/gal,, vis. -~2- sec.~ WL .13~6 cc~ sand ~, filter cake 2/~". Drille& to .1551 in hat&, dense sandstone.. Deviation: 151g' 0 ~$ 05"~ M.mi~ ~t.. ll.~7 lb/gal~ ~is. 55 se¢.~ WL 1.3. Drille& to 1651 in ha~, &ense san& with chert.. Deviation 16S~ -'~ 1° 00.~'.. ~:: wt. ll.S lb/gal~,, vim 40 sec., WL 15.8 cake 2/~'"~, s~nd. 3%.- Dr~e& to 1778 in hard~ .~nse sand~ Deviation: 1750' 0° 50~. ~ud: wt.. ll,.7 lb/gal_~,~ vi~ ~2 sec.~ WL 1~.6 cc, cake Drilled to !875 in silt,stone with san&,. Mmic, wt. 11.7 lb,/ ~, vis..~ t,5 see.~ WI, .8.4 ce, cake 2/.~"'~ sand Drilled to 195k in .siltstone with san&. Deviation~ 1891' 0° 10-". .u&~ w%. ~,8 lb,/gal.., vis. 115 sec., WL 9.1 cc, cake 2/S.'2"¢ ~ .10, san& 5~o JUL :!8 19~0 DANGEROUS RIVER UNIT NO. 1 Icy Bay-Cape Fairweather 'Area Oil & Gas Section Division of Mines and Minerals ~2~[aska Dept. of Natural Resources Weekly Report of 'Drilling Progress for the Period July. 4 - July 11 7-5 7-6 7-7 7-8 7-9 7-10 7-11 Drilled to 1417 in unconsolidated sand with chert. Ran ES and Micrq logs, log TD 1412. No correction on drillers measured depth· 6 hrs opening 12~" hole to 17½" to 289'. Mud: 12.3 lb/gal, vis 63 see, san~ 5%. Depth 1417'. Opened 12~" hole to 17½" to 1159'. Mud 12.8 lb/gal, vis 65 sec, sand 5%, -.... '- 1~_,, Depth 1417'· Opened 12~" hole to -e to 1397· Mud 13 lb/gal, vis 65 sec, sand 5%- Depth- t~17' -.:Opened ~o!~,, 17~" · · _ '~w hole to 2 to 1405' Began running 13 3/8" casing, casing stopped at 72'. (Conductor casing shoe at 72'.) Pulled .casing, went in hole with hole-opener bit, cleaned-out .bridge and ci~cu- iated fro~.j1400' for 2 hrs. Ran_ 13. 3/8" casing, again' it stopped at 72'. Went in. hole with 16~'" over-shot s-kir..-t' .on hole-opener and drill collars, cleaned out bridge: ~ and circulated hole frigoro. 1400' for 2 hrs. ~an".43 . joints, 1379.89' (inc shoe of 1.25' and float collar of 1.86').Qf lB B/8" H-40, 8 Rd Th, R-2. Casing set at 1394.81' RDB. Cemented with 400 sX regular Portland, 15.5 lb/gal. Mixing time 35 min~ displacement 30.~min, Completed at 11:30 P.M. . Depth 1417'. Cemented around top of 13 3/8" casing with 90 sx through 2". Completed at 12:30 A.M. WOC. Depth 1417'. WOC. Began installing BOP. Drilled to 1435' in hard sand with chert. Top of cement inside casing 1364. Pressure tested casing before ~and after drilling float and cement above shoe~ 1000 psig held for 30 mino Began drilling new hole at 6:00 P.M. Mud ll.8 lb/gal~ vis 45 sec. DANGEROUS RIVER UNIT NO. 1 Icy Bay-Cap~_i Fairw~a'~e~'r 'A~e,,a Weekly Report of Drilling Progress for the Period June 28 - July 4 6-28 6-29 6-30 7-1 7-2 7-3 7-4 Drilled to 10'. Spudded at 11:00 P.M. with t2~" bit. Drilled to 76' with 12~" bit~ Opened t2~" hole to 22"° Ran 3 joints, 76'~ 18" ID, 42~/ft, slip joint, Welded, casing. Set casing at 72' KB. Cemented with 148 sx regular; began mixing at ll:05 A.M., completed mixing at ll:20 A.M~, cement circut-ated to.the surface. ~WOCo Drilled to 89' in sand. Drilled out of conductor casing at 11:~0 P.M. - ~t tt Total WOC on conductor casing 36 hrso Drilling ±a~ holeo Drilled to 285' in sandy mud stone° Circulated for 16 hrs, arrival of Schlumberger uncertain° Deviation: 190' 1° 0'~ questionable sur- vey; 285 0° 00'. Mud 17.7 lb/gal, vis 95 sec° Drilled to 629 in sandy mud stone° Deviation: 500' 0° 05'. Mud 12 lb/gal~ vis 74 sec° Drilled to 1t07' in unconsolidated sand with pea gravel. .Deviation: 715' 0° 15'; 935 0° O5'. Mud 12.2 lb/gal~ vis 60 sec° Drilled to 1402 in hard unconsolidated sand and chert. Deviation: 1187' 0° 05'; 1340' 0° 05'° Mud 12.4 lb/gal, vis 60 sec, sand 4%. Oil & Gas '~ ' ~ecNon Division ot7 Mines and M~nerals _Alaska Dept. of Natural t{e,5ottrce~ July 8, 1960 Co~.omtn° 0~,. t~o G~ JUL 5 1960 I~ENVEP., COLOI~AD 0 June 30~ 1960 Oil & Gas Section Division of Mines and Minerals Alaska Dept. of Natural Resoaz_ces Mr. Donald D. Bruce Division o£Mines and Minerals 329 Second Avenue Anchorage~ Alaska Dear Mr. Bruce: This is to advise that we c~npleted rigging up at our Dangerous River Unit No. 1~ Zcy Bay-Cape Fairweather Area on June 28 amd the well was spudded on the same date. In accordance with your instructions we will furnish you a weekly re- port of the drilling progress at this drill site. Very truly yours~ COLORADO OIL AND GAS CORPORATION J. R. Coleman Manager of Drilling and Production JRC: vbs Colorado 0il & Gas Corporation Dangerous River Umit~,~ No. 1 ~.-, ~ .- Permit~.~No · 20 Issued: 5-2 -60 Loc: 990' IzNL & 1650' FEL, Sec. 17, T29S-R3?E, CP, B&M Elev: 38' KB, (23°4' 6sg. flange) Contr: Company rig. Spud: 6-28-60 Comp. P&~%. 11-19.-60 T.D. 8634' Csg: 18" IoDo @ 72' w/ 148 sx. 13 3/8"@ 1395 w/ 400 sx. Plugs: 8600'-8500' 50 sx. 6850'-6750' lOO sx. 1425'-1375' 50 sx. 30'-Surf. 20 SXo COLORADO 0:L AND SAS DENVER ~LUB ]:~UILDINS ~]ENVER, COLORADO May 11, 1960 State of Alaska Di~sion of Mines and Minerals 329 Second Avenue Anchorage~ AlaSka Attention: Mr. Donald D. Bruce Gentlemen: In answer to your question concerning our operation in the drilling of Dangerous River Unit No. 1~ we wish to advise that Mr. D. H. Meek is the Superintendent in charge of our operations in this area. Correspondence concerning this operation may be addressed to Colorado Oil and Gas Corporation~ Yakutat~ Alaska~ Attention: Mr. D. H. Meek. Very truly yours~ COLORADO OIL AND GAS CORPORATION J. R. Coleman Manager of Drilling and Production JEC :vbs Oil & (3as Section Division of Mines and Minerals Alaska Dept. of Natural B. esource.~ COL0~.AD0 0:L .AND G.As ]-]ENVER [-]LUB ]:~UILDIN~ I~ENVEPt, COLORADO April 26, 1960 Re: No. 1 Well on Proposed Dangerous River Unit Icy Bay - Cape Fairweather Area State of Alaska Department of Natural Resources Division of Mines and Minerals 329 Second Avenue Anchorage~ Alaska Attention Donald D. Bruce State Petroleum Geologist Gentlemen: In reply to your letter of April 21~ 1960~ please find outlined below the casing program we plan to use on our forthcoming Dangerous River No. 1. 1. Approximately 100' of 18" ID casing (cemented to surface). 2. Approximately 1500' of 13-3/8'~ OD surface casing (cemented with 500 sacks). 3. Should it become desirable to set intermediate casing, 8500' of 9-5/8" casing will be available. 4. Should production casing be required, an adequate amount of 5-1/2" is on hand for use. This is an exploratory well to an approximate depth of 8500' and there is insufficient information to predict the depths of objective pay zones; therefore~ the setting of intermediate casing is subject to depth and hole conditions. Yours very truly~ COLORADO OIL AND GAS CORPORATION J. R. Coleman Manager of Drilling and Production TDP/JRC/rf COLORADO 0IL .END GiB COI:tBOBATION ~ENV~R, ~ OLOBADO April 19~ 1960 Division of Mines and Minerals 329 Second Avenue Anchorage ~ Alaska Attention: Mr. Donald D. Bruce APR '~1 1960 0il & Gas Section Division of Mines and Minerals 2flaska Dept. o£ Natuzal Resouzce~ Gentlemen: Forwarded herewith are three copies of our Application for Permit to ~rill the No. i Well on the proposed Dangerous River Unit~ Icy Bay- Cape Fairweather~ Alaska. Included with this application are plats which show the outline of the proposed Dangerous River Unit and the proposed location of the No. i Well. Our check in the amount of $50.00 to cover the permit fee is enclosed. Your early approval ~of this application will be appreciated in that we plan to start moving equipment to this location within the next two weeks and hope to be in position to start actual drilling opera- tions sometime prior to July l~ 1960. Very truly yours~ COLORADO 0IL AND GAS CORPORATION Coleman Manager of Drilling and Production J~RC: vbs Encl. APPLICATION' FOR PERMIT TO DRILL, DEEPEN OR PLUG BACK i~LLLI V LI.J I APR 91 [960 o~l~ ~and ~as~' N'atu~al -~:,5_ -.- ~ ~ au ~': _ APP,~IC-ATtON. TO- DRILL~:~ ,5'5: ~,'~ D:E~'EN ~- ' PLU~ BACK ~. NAME OF COMPANY OR OPERATOR DAT~ Name of lease ..... '[ XVelf number ~levation (~round) Well location (give Iootage from section lines) Seotion~township~range or block &,survey Distance, in miles, and direction from nearest town or post office Nearest distance from proposed location to property or lease line: feet Proposed depth: Rotary or cable tools Number of acres in lease: Distance from proposed location to nearest drilling, completed or applied--for well on the same lease: IApprox. date work will start Number of wells on lease, including this well, completed in or drilling to this reservoir: If lease, purchased with one or more wells drilleq, from whom purchased: Name Address Status of bond Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zone and expected new producing zone) CERTIFICATE: I, the undersigned, state that I am the - '~'' f the (company), and that I am authorized by said company to make this report; and that this report was pre- ~ ~!~are e, correct and complete to pared under my supervision and direction and that the facts stated t ~ect and complete the best of my knowledge. · ~hatkre' Permit Number: ~ ~) '" d ~ I Approval Date:~rrr°v¢ :---~z~---~-'-'/0 Approved By:-- ~-~'t "~' D. D. Bruce, Pe~oleum Geolo~t ~otlee: Before~,~i~~~s~~ou have a~ ~fo~a~ionxeques~uch g~eeessar7 eorregpona- ' enee wffi~ ~~e~amrm memurce~ See ~s~ruetion on ~everse 8~de of ~or~.' ': Alaska Off and Gas Conservation Commission Application to Drill, Deepen 6r Plug Back Form No. P-1 Authorized by Order No. I Effective October 1, 1958 2560 ACS - ' 025394 .... i 2,~0 ACS //~// 02512! t~-Z'560 ACS 025240 ' ,' Ill ...... PROUD UOC. ~~lll ~NVER CO~A~ --'' C y ~Ay -- cApE FA ' RwE. ATH Em ~ A R Er A 'SOUTHEAST A~SKA ' o , ,/~ , , - : '- ; .,!~,, . '- I ' :' ~~~ ~~~ ~_ . Ormff ..1~ J.H.I SCl. II I"= 4000' I i~r,I I{~0 I' m' , ' ~ ' ' II ~ ~ '