Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout163-017lc-apfm
lOJan95
LOCATION CLEARANCE REPORT
·
State of Alaska
o~. ~ ~ ~0.~v~o. ~o~~o.
Memorand, To File: ~I No..
Operator
Spud: ? ~~ ~A
NOte Casing size, '~, de~th, ~t vol,
Review the well file, and comment on plugging, well head
status, and location clearance - provide loc. clear, code.
Lo~a~ion Cleazance:
Code
Date 7 ~-'''~-~ 7C'5~
June 4, 1982
Mr. Kirk W. Sherwood
Amoco Production Company
P. O. Box 779
Anchorage, Alaska 99510
Re: Geologic Slides and Analyses
Prepared from State !dell
Samples and Core Chips.
Dear ~r. Sherwood:
The enclosed list reflects various geologic slides and analyses
that have been recently added to the State's library of special
materials prepared from ~ell-s~ples and core c}~ips filed with
the Com~mission. The material~ listed are in addition to those
tabulated in the 1980 Statistical Report and those reported in
the February, March and April monthly bulletins. Please
photo-copy and distribute copies of this list to appropriate
persons within your cmnpany. You are the only ~orson in your
company to ~o~ the list has been sent.
In the. event publication of the coc:mission'~ nmnthly bulletin is
not resumed, the'next listing of ne~ly received geologic
materials ~ill be distributed approximately September 1, 1982.
For current info~.ation on newly received ~aterials please call
the Commission office at'any time, ~eekdays 8:00 AN to 4:30
Alaskan Time.
Sincerely,
l~'illiam Van Alen
Petroleum Geologist
.Enclosure
ALAS .... OIL AND'GAS ODNSERVATION ~)~,IIOSION
June 1, 1952
RECENTLY RECEIVED GEOLOGIC MATERIAL8
The following geologic materials have been recently added to the
Commission's library of special materials prepared from well
samples and cores of wells drilled in the State. These materials
are in addition to those tabulated in the 1980 Statistical Report
and those reported in the February, March and April Bulletins.
Foraminifera Sam. pi_es
Y"-~'e0 catiied~al Rlvo U. #1
Palynologie 51 ides
-~-~sOC~Pi °wn0- 'Un i t #24-8
S~ Soldotna C~, ~22~2
Th~al Alteratton/Kerogen Slides
-;-~~-.N~p~ ~wn.~;-Un l.t -._ ~ 24.L~. _.-
SOC~,~Soldotna Ct. ~22-32
Thin-sections 'of Core ~ips
.... "~b'il.~, K~'i a ~- St'~."' ~ i 5~.'9'~6-
.. . ·
~ Thin-SeCtions 'of Ditch Samples
Geno~al Petroleum Great Basins
Gulf Sandy River ~1
Pan ~eriCan David River ~I-A
Pan ~erican Hoodoo Lake
NO. of
SI ides Interval
89 50 - 14,360
13
19
14,600 ' 15,226
13,640 - 14,560
4 14,600 - 15,226
9 13,640 - 14,560
11 9644 - 9695
14
37
2
34
34
2400 - 4490
2210 - 8810
6280 - 8180
1350 - 4760
2480 - 8050
Vi t r in_it e'_~Re f.! e.c..t an,ee~_S..! ide s[P!~gs
- Mobil W,i-staineS--#2
Texaco Ii/.' ltavik #.1
Exxon Canning River B-1
ARCO gavik #1
FOrest /emik #1
B,P, Kemtk #2
~xxon Canning River A-1
~Thermal Maturation Reports
---R~P~'rt:'-on~ '-t 0 t al-'"0rgani e--Carbon
and Vitrinite Refleotanoe Val~es
for eight North Slope wells.
~Report on Rock-Eval-data for
.~.:~:..~'eight North Slope wells,
48
44
39
37
37
4
11
1020 - 13,150
1590 ' 16,530
1040 ' 10,800
560 - 9500
710 - 10,000
3750 - 5250
530 - 6500
1359 analyses
320 analyses
CITIES SERVICE COMPANY
ENERGY RESOURCES GROUP
Mr. William Van Alen
Alaska Oil and Gas Conservation Commission
3001 Procupine Drive
Anchorage, Alaska 99501
Cities Service Building
5100 Southwest Freeway
Box 27570
Houston, Texas 77027
(713) 850-6100
May 6, 1982
Dear Bill:
Here are the palynol ..' .. :._. . - ~en slides prepared
in our laboratory for th '~~aptowne ~24-8 d the SOCAL
Soldotna Creek #22-32 wells.----Th~-k~~ides are indicated by
the garm~ notation (oc) located to the right of the index numbers
on the appropriate slides. The entire sample cut from each depth
interval was used due to their sparse pollen content. Two paly-
nologic smears were prepared from most of the sample cuts. Screened
slides were not prepared because of insufficient sample size.
Cities Service greatly appreciate the opportunity to utilize
the well materials and facilities provided by the Alaska Oil and
Gas Conservation Conm~ission. We look forward to further interaction
with the Commission in the future.
Thanks againu
Sincerely, REtEIVE
-Joe Davidson
Staff Geologist AIE~ka Oil & Gas Co,is
U. S. Offshore Frontier Region ,'tJlcllorag'~ .....
JDD/jed
Enclosures
cc: Mr. Mike Oliveira
File
~arch !2, t982
Mr. Joe Davidson
U.S. Offshore Frontier Region
Cities Service Company
P.O. B~' 27570
~ouston, Texaa 77027
Ret Preparation of Palynologic/Kerogen Slides from Well Samples
and Core Chips in the State Library Collection
~ear Joe~
In confirmation of our discussions during your visit to our
office February I9, 1.982, permission has been granted to Cities
s~9~e envelo~ or I cc. of core m~eria~ ~r foot of core from
the State's set of s~pies and core ch~ps for t~ sole pu~ose of
pre. ring palynol°gic aRd kerogen slides at 100 foot core.site
depths within the 4esigna~ lnte~als in the fol1~ing wells,
subject to the con~tions set forth below~
39
Cuttingsl 14, 600'-15, 226'
Core t 14, 856 '
Cuttingsl 13,640'-14,560'
Co~DIT!_0~
Cuts of the sample and/or core material by CITCO from.
the State col le~ion have been extracted only frc~
those i~divfdva, l envelopes or bags in which total
content of c~tings or cor~ material was greater than
10 cc. (No ~ts were extracted where the vo~u~ of
~k~terfa! in t.~' in~vidua! envelop~ was les~ than 10
CC, )
CITCO has provided the State with a list of the specific
sample an~ core footages fro~ which material was ~xtracted.
3~
One composite set and one screened set of palynologic
slides-and one set of kerogen slides are to bu prepared
for the above well.
,' Mr. o ~oe Davidson
1982
All slides pr~ared are to be Eeceived by the Ccem~ssion
direct ~o ~ha C~i~sion a~ no~ ~am~ned ~ out~de
All residue &nd excess ~atertal is to be Eetuxned to
the C~ssion and no slides or sample ~aterials are to
~o pet.~o~raphic or other slides are to be prepared nor
shall _~ar all costs 'entailed.
We &re. p.le&sed to vo~k-'~rlth ~.u in _this beneficial Project and
look-:~o~ard to yo~ c~~ s contlnu~ '~e~cise of Care a~
-~ateria.1. I ~ ~ ~th U~ers~d t~t the State's well a~pl-e
lt~a_~ is ~ltC ~~r~y and t~t g.rantin~ CITCO ~~mslon to
~tra~ ~atons of ~~ial fr~ this lib~a~ for the pu~se o~
~e~rin~ the ~dtcat~' slides enh~es t~ value of the lt~U
November 17, 1980
Mr. George Stadnicky
union-Oil Company cf California
P. O. Box 6247
Anchorage, Alaska 99505
Re:
Preparation of Petrographic Thin-Sections
of Cores from State Well Sample Library.
Dear George=
Pursuant to our November 13, 1980 discussion on the captioned
subject, pe~rmfssign is hereby granted to Union Oil Company of
California. to 'cut a maximum of i cc. of core material per foot
of core from the State's set of core chips from the following
wells for the sole purpose of preparing thin-sections within
the designated intervals, subject to the conditions set forth
below:
Sample
Set No Wel 1 Interval
174
81
124
48
109
215
17
63
93
'Amoco Albert Kaloa %1
Amoco MGS 17595 %4
ARCO W. Foreland Unit %3
Pan Am- Tyonek St. %1
~24-~-~ ~
Union Granite Pt. MUC I-1
Halbouty Ak D&M King Oil %1-B
Pan Am MGS 17595 %2
Mobil Granite Pt. #1
13,067' - 13,078'
7,340' - 8,196'
9,170' - 9,286'
12,832' - 12,488'
13,072' - 13,108'
12,975' - 13,017'
13,300' - 13,439'
10,554' - 10,557'
11,245' - 11,257'
Cuts from the State's set of core chips are to be made only out
.of those individual envelopes or bags in which the total volume
of core material is greater than 10 cc. Union will provide tho
State with a list of the specific core footages from which
material was extracted.
Union shall bear all costs entailed and will provide Alaska 0il
and Gas Conservation Commission with a complete set of all
thin-sections prepared. All thin-sections and all' core residue
materials are to be received by the Commission by approximately''
Pebruary 15, 1981. No core material is to be retained by Union.
Mr. George Stadn',_.~y~ -'2-
November 17, 1980
All materials are to be transmitted direct to the Commission
and are not to be examined by outside parties.
We are pleased to work with you in this mutually beneficial
endeavor and look forward to your company's continued exercise
of care and good judgement in the handling of this limited
quantity of well material. I know we both understand that the
State's well sample library is public property and that grant-
lng Union permission to extract portions of material from this
library for the purpose of preparing the indicated thin-sections
enhances the value of the library and is in the public 'interest.
Very truly yours,
William Van Alen
Petroleum Geologist
cc:
Mr. Art Trevena
union Oil Co. of Calif.
P. O. Box 76
Brea, California
~"~A ~ be
AMERICAN STRATIGRAPHIC
P.O. BOX 2127 · ANCHORAGE, ALASKA ·
TRANSMITTAL
COMPANY
Mr. John Leverson
Div. of Oil & Gas
3001 Procupine Drive
Anchorage, AK. 99~04
, une 197
,
Dear Sir:
We have transmitted this date via w,.~.~nal D-11v~-~y
_ washed .... samples from the:
Shell - No. 1 Middle River State
110 - 5277 (2Boxes)
Shell-Cottonwood State No. 1
42 - 4245 (3 Boxes)
Atlantic - Lorraine Sta~te No. 1
342 - 8010 + Core (8 Boxeq)
Pan Am - Edna Mae Walker No. 1
340 - 16,3OO +~Core (12 Boxes)
Yukon- Campbell Point Nh. 1
0 - 4744 (3 Boxes)
Shell - Kustatan River No. 1
0 - 3964 (3 Boxes)
/~ e~ocal- Napto~ne Unit No. 24-8
220 - 15,226 (6 Boxes)
Please acknowledge receipt by returning one copy of flxis transmittal.
Very truly yours,
American Stratigraphic
Receipt acknowledged .,
R e ma rks:
AMERICAN STRATIGRAPHIC
P.O. BOX 2127 · ANCHORAGE, ALASKA ·
TRANSMITTAL
COMPANY
Sept. 25, 1967.
Hr. Harry Kugler
State of Alaska.
Div'n of Ni~s & Hiner~s
Anchorage, Alaska. 99%01.
Dear Sir:
We have transmitted this date via ~sonal Delivery
_Unwasl~,ed samples from the:
(Transmittal)
Standard: __ -~ ~ Calif
Napt ~ Wel~. No. 2 -.
260-15,226.
Placed in storage for State of Alaska.
Please acknowledge receipt by returning one copy of this transmittal.
Very truly yours,
Ronald Brockway
American Stratigraphic Co.
Receipt acknowled ged
by
date
Remarks:
cc: Hr. A1 Scouler, SOCAL-Anchorage.
COMPLETION REPORT - NEW WELL
STANDARD OIL COMPANY OF CALIF..ORNIA, WESTERN OPE?~,T, IONS., I.NC. -. OPERATOR
AREA: Kenai Peninsula, Swanson River Area, Alaska LAND OFFICE: Anchorage
Lease No.: A-029044
PROPERTY: NAPTOWNE UNIT
WELL NO.: NAPTOWNE UNIT #24-8
LOCATION: 827' North and 1544' East from South-west corner of Section,8,
T. 6 N., R. 8 W., S. B. & M.
ELEVATION: 280' K. B.
K. B. is 14' above ground.
DATE: May 16, 1966
BY:
C. V. CHATTERTON, Dist. Superint:endent:
DRILLED BY: Coastal Drilling Company, Rig 4~ 3
DATE COMMENCED DRILLING: January 9, 1966
DATE COMPLETED DRILLING: April 27, 1966
DATE INITIAL PRODUCTION: None - Well plugged and abandoned April 27, 1966
SUMMARY
TOTAL DEPTH: 15,226' T.D.
JUNK: None
CASING: 20" cemented at 198'
13 3/8" cemented at 2000'
9 5/8" cemented at 9670'
PLUGS: Cement. 0 - 217 '
Cement 5683' (Est.) - 5883'
Cement 5883'- 6040'
Baker Mod. "N" at 6040'
Hallib. C. I. B.P. at 6370'
Hallib. C. I. B.P. at 6452'
Cement 9250'- 9400'
Hallib. C. I. B.P. at 9400'
Cement 9550:- 9720'
~ ' 5127168
~ '~ ......... ',~', .;Lease Date .................. .
·
State of Alaska
Depar~ent of Natural Resources
Sec. _ 8
_, ~ ~,, ,., ,, ,, _ , ~ ~ :. ::~_':
DIVISION OF MINES AND MINERAL~
6~
Petroleum Branch T, ==; ...........
INDIVIDUAL WELL RECORD
Operator.~tandard.Oil Co. of CalifLocation
Lease No, A-029044
or Owner Naptowne Unit
R. 8W
S Meridian
Permit No. 63-17
Issued 9/3/63
(Surface) 827' FSL & 1544' FWL, Sec? :.8
24-8
Well NO ....
Loc. (Bottom)
Area
Drilling ceased
Abandoned: . 4/27/66
Suspended.
Completed (F-GL-P)
IP B/D, Gray
Total Depth 15,226 '
Elevation 266' Grd
API Cut
Gas ......... ~ MCF/D, Bean
Casing ~ Size ~Depth Sx cm~t
20" ' 198 ' 550
13 3/8" 2000'
~,.
9 5/8" 9670'
/64 CP p si, TP
Perf: 9460'-9480' Test 1 Plugs:
6485'--6495' Test 2
2200 6385'-6400' Test 3
600 DV~735
800 @ shoe 6085'-6095' Test 4
GEOLOGIC FORMATIONS
Surface Lowest Tested.
Name
: psi
9720' -9550'
'= ' (Est. tOp 9250')
Br. pg 9400 + 60 sx above /
Br. pg. 6452'
. -
,, .~- ,.._ ; . - ..... _- , .
Br. pg. 6370'
604.0 -cm sx
5883] -_5683 ' (.est) 75 ,~ :~--
PRODUCTIVE HORIZONS 217"SurE. 75 Sx
Depth Contents
...
Ye ar
Jan Feb Mar,, .Apr
WELL STATUS
l~y June July Aug
~: '7 .. :~:~ ~,, _' 7%,' ,,; ,.,:
Sept Oct Nov Dec
Remarks:
CONTRACTOR:
Coastal Drilling Company
COMPLETION REPORT Page 2
NAPTOWNE UNIT #24-8
SECTION 8, T.6N., R. SW., .Seward B & M
STANDARD. 0iL-coMPANY OF cALiF0~NiA'~ WE-STERN dpERATi0-N~' iN0 i" - OPERATOR
PERFORATIONS: 4 - 1/2" Jet holes/foot 9460' - 9480'
4 - 1/2" Jet holes/foot 6485' - 6495'
4 - 1/2" Jet holes/foot 6385' - 6400'
4 - 1/2" Jet holes/foot 6085' - 6095'
WELL SURVERYS:
1.~ Schlumberger Dual Induction Laterolog
2.
3.
Schlumberger Borehole Compensated Sonic Log
Schlumberger Compensated Formation Density Log
Schlumberger Neutron Collar Log
Schlumberger Cement Bond Log.
Run #1 in 13 3/8" casing
Run #2 in 9 5/8" casing
Schlumberger Continuous Dipmeter
Exploration Logging Mud Log
196' - 15,208'
196' - 15,202'
5,300' - 9,671'
& 12,600' - 15,120'
5,000' - 9,668'
20' - 2,000'
4,400' - 9,668'
2,000' - 15,096'
227' - 15,226'
FORMATION TESTS:
HCT ~1 on Perforated Interval
HCT #2 on Perforated Interval
HCT #3 on Perforated Interval
MCT #4 on Perforated Interval
9,460' - 9,480'
6,485' - 6,495'
6,385' - 6,400'
6,085' - 6,095'
COMPLETION REPORT Page 3
NAPTOWNE UNIT #24-8
SECTYON 8,..T.6N., R. 8W., Seward B. & M
STANDARD OIL C0~ANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPERATOR
January 9, 19~6
Spudded at 4.00 P.M. 1-9-66
Drilled 14 3/4" hole to 137'
70 pcf. mud.
Jan,ua. fy .!0, 1966
Drilled 14 3/4" hole to 227'. Opened hole to 26" to 227'. Circulated hole
clean.
Ran 20" 78 6~, Grade B Buftwe'ld casing, equipped with Baker Guide Shoe,
, ·
Baker Duplex float collar and 3 centralizers.
Casing stopped at 198'
~anRary..ll,~1966
Cut off casing. Ran 6 joints 4 1/2" drill pipe and screwed into float collar
at 182'. Broke circulation and lost same. Mixed gel and lost circulation
material. Worked pipe and rotated, but unable to work any deeper. Regained
circulation.
Cemented 20" casing at 198' with 500 sacks construction cement. Mixed cement
in 25 minutes, displaced in 5 minutes with 20 cu. ft. water. Used 420 cu. ft.
mixing water, average slurry ll4#.preceded' with 10 bbls. water. Full
Circulation. Cement in place at 7:00 P.M.
January. 12.., 1966
Cut,off conductor and welded on 20". flange. Flanged up.
13, 1966
24 hours welding and flanging up.
.January .1,.4, 19~6
Flanged up. Tested Blind Rams with 1900 psi for 15 minutes - ok. Drilled
mouse hole. Drilled out Float collar, cement and shoe. Top of cement at
180' .
J,anua~ry.. 15, 1966
Drilled hard cement 198' 228'. Drilled 12 1/4" hole to 233'. Pulled and
laid down hole opener. Picked up driltrols and drill collars. Exploration
Logging commenced mud-logging at 227'.
Drilled 12 1/4" hole 233' -487'.
70 pcf. mud.
COMPLETION REPORT Page 4
NA?TOW~E ~TN~T #~4-8
_SECTi[ON 8, .T.6N., R~ 8W., Sews.Id. B.. & M
STANDARD OIL CO~[PANY OF CALIFORNIA, ~,~ESTERN OPERATIONS, INC. - OPERATOR
January 16, 1966
Drilled 12 1/4" hole to 1789'
71-83 pcf mud.
January 17, 1966
Drilled 12 1/4" hole to 2000'
Made wiper run, circulated and conditioned mud. Ran Schlumberger Dual In-
duction Laterolog 1996' - 196' and Borehole Compensated Sonic Log with caliper
1990' - 196'.
Ran 12 1/4" bit and 18 5/8" hole opener. Tk~,isted off while opening hole at
266'. Made up fishing tools.
77-79 pcf. mud.
JaBua~y 18, 1966
Ran 4 i/2" grapple. Would not go over fish at 55'. Ran 6 1/4" grapple. Went
over ok, but pulled off. Ran 6" grapple, pulled off. Reran 4 1/2" grapple,
unsuccessful.
Dressed Bowen Mill guide with tungsten carbide. Ran same with 4 1/2" grapple
and 12 1/4" skirt. Worked over fish, milled, dropped down on fish and
recovered same. Ran 18 5/8" hole opener and opened hole 266' ~ 1482'.
January 19 an.~. 20, !96p
Opened hole to 18 5/8" to 2000'. Circulated and conditioned hole for 13 3/8"
casing. Ran 13 3/8" casing.
CEMENTING DETAIL
Cemented 13 3/8" casing at 2000' in a single stage around shoe with 2200'
sacks cement. Mixed in 1 hr. 25 min. displaced in 65 minutes with 1670 cu. ft.
mud. Used 270 bbls. mixing water, average slurry 115#. Preceded with 15
bbls. water and no bottom plug. Bumped top plug with 1000 psi. Full cir-
culation and good cement returns. Cement in place at 1:00 A.M. 1-20-66
Used Halliburton truck equipment. Displaced with rig pumps.
Hookload weight before cementing 129,000~.
After cementing, before landing 93,000#
At time of landing 93,000#
COMPLETION REPORT Page 5
NAPTOWNE UNIT # 24-8
SECTION 8, T.6N., R.8W.~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPEP~iTOR
CASING DETAIL
K. B. Depth
Above K.B. - 5.36
18 joints 13 3/8", 68#,J-55, S8R, Rg.3, 725.36
33 joints 13 3/8", 61#,J-55, S8R, Rg.3 1280.00
Casing landed at: 2000'
720.00 '
2000.00 '
Casing equipped with Baker Guide shoe, Baker Flexiflow collar at 1960, and 5
centralizers at 1990', 1970', 1950', 1920' and 1882. Cleaned celiar and un-
flanged 20" BOPE while waiting on cement. Cut off 20" and 13 3/8". Located
firm cement at 30'. Cemented to surface with 34 sacks cement. Welded on
landing flange. Pressure tested flange with 2500 psi. for 15 min. - ok.
Reinstalled BOPE.
Ja~nuary. 21.z.. 1,9.6,6
Flanged up. Installed kill line and Blow down line.
Magnafluxed all drill collars and driltrols. Picked up drill collars. Tested
BOPE with 2500 psi - ok. Checked Kelly Cock with 2000 psi - ok. Checked Blow
down line to manifolds and kill line.
January 22~ 1966
Ran in with 12 1/4" bit. Cleaned out Float collar, hard cement and shoe.
Drilled 12 1/4" hole 2000' - 2578'.
71-76 pcf. mud.
January 23-26~. 1.966
Drilled 12 1/4" hole 2578' - 6219'.
74-83 pcf. mud.
January 27, 1966
Lost approximately 50 barrels mud over a two hour period while drilling at
+ 6259'.
Stopped mud loss by cutting mud weight from 79.5# to 78.5# and raising vis-
cosity to 52.
Drilled 12 1/4" hole to 6735'.
79-80 pcf. mud.
January 28, 1966
Drilled 12 1/4" hole 6735' - 7276'.
78-79.5 pcf. mud.
Page
F~b. ruary, it 1966
Lost pump pressure while drilling at 7278'. Pulled out. Left 1 - 8" drill
collar, shock sub and bit in hole. Top of fish at 7237'. Ran 9 3/8" Bowen
150 overshot with 7 3/4" grapple, bumper sub and jars. Ran in, engaged fish
and recovered same. Laid down one bad drill collar. Managloed drill collars.
FebruaryL.' 2, .1.966
Reamed 7230' - 7278' and drilled 12 1/4" hole to 7400'.
Februa!y 3, 1966
Drilled 12 1/4" hole to 7458'. Circulated and conditioned mud. Ran Schlum-
berger Dual Induction - Laterolog 7456' - 2000' and Borehole Compensated
Sonic log 7460' - 2000'.
February 4, 1966
Ran Compensated Formation Density Log 7459' - 5300'.
Ran in. Hole took about 50 bbls. mud on morning tour. Reamed 7400' - 7458'
Lost pump pressure. Pulled and found jet out of bit. Ran new bit.
Drilled 12 1/4" hole to 7489'.
February 5-7,. 1966
Drilled 12 1/4" hole 7489' - 7961'.
Febru. ary 9-.11~..!966.
Drilled 12 1/4" hole 8170' - 8797'.
~eb~ary 8, 1966
Drilled 12 1/4" hole to 8090'. Pulled and laid down washed out drill collar.
Drilled ahead to 8170'.
78-79 pcf. mud.
78-79 pcf. mud.
February 12, 1966
Drilled 12 1/4" hole to 8894'. Circulated. Ran 7 5/8" Chritensen Diamondco=e
head. Cored 7 5/8" hole to 8915'.
79 pcf. mud.
78 pcf. mud.
78-79 pcf. mud.
79-81 pcf. mud.
COMPLETION REPORT
NAPTI~NE UNIT #24-8
SECTION 8, T.6N., R. 8W.~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, - OPERATOR
COMPLETION REPORT
~.~ ......... ~O~,NE UNIT #24-8
SECTION ,8,~,, T6N.~ R..SW, Seward B. & M
Page 7
STANDARD OIL COMPANY OF CALIFORNIA,. WESTERN OPERATIONS, INC. - O~'ERATOR
February 13, 1966
Cored 7 5/8" hole to 8934'.
Core #1: 8894' - 8934'. Cut and recovered 40'.
Opened 7 5/8" hole to 12 1/4" and drilled ahead to 9082'.
79 pcf. mud.
February 14 and 15., 1966
Drilled 12 1/4" hole 9082' - 9626'
78-79 pcf. mud.
February .16, 1966
Drilled 12 1/4" hole to 9667'.
Circulated and conditioned mud. Ran Schlumberger Dual Induction-Laterolog
9668 4500' Borehole Compensated Sonic log 9672' - 7456' and Cement Bond
Log 9672' - 2000'.
79 pcf. mud.
February.17z 1966
Ran Compensated Formation Density log 9671' - 7459' and Continuous Dipmeter
9669' - 2000'.
Took 24 Sidewall Samples.
Strung to 10 lines and ran in hole. Circulated and conditioned mud for
9 5/8" casing.
79 pcf. mud.
February 18, 1966
Circulated and conditioned mud. Ran 9 5/8" casing to 9670' (Corrected casing
measurement). Circulated through 9 5/8" casing.
February 1~ 1966..
CEMENTING DETAIL
Cemented 9 5/8" casing at 9670' in two stages with 1400 sacks cement.
First Stage: Cemented around shoe with 800 sacks cement treated with 0.4%
HR-7 retarder. Mixed cement in 24 minutes, displaced in 61 minutes with
4000 cu. ft. mud. Used 96 bbls. mixing water, average slurry 116#. pre-
ceded with 18 bbls water and "Mud Kil". Bumped plug with 2000 psi. Good
circulation.
G. I. F. at 3:15 A.M.
COMPLETION REPORT Page 8
N.APTOW~ UNIT #24-8
SECTION.8, T6N..,R8W..~.Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC~ - OPERATOR
Second Stage: Cemented through DV ports at 6735' with 600 sacks cement.
Circulated 1 hour 10 minutes, Cement treated with 0.4% HR-7 retarder. Mixed
cement in 19 minutes, displaced in 40 minutes with 2840 cu. ft. mud. Used
72 bbls. mixing water. Average slurry 116#. Preceded with 18 bbls. water and
"Mud Kil". Closed ports with 2750 psi. Bled ~ff to 0 psi. Good cir-
cu lat ion.
C. I. P. at 7:00 A.M.
Used Halliburton equipment. Displaced both stages using rig pumps.
Hookload weight before cementing 350,000#
After cementing before landing 330,000#
At time of landing 330,000#/
CASING DETAIL
K. B. Depth
Above K. B.
34 joints 9 5/8",43.5#,P-110, L8R
34 joints 9 5/8",43.5#,N-80, L8R
43 joints 9 5/8",40.0#,N-80, Buttress
54 joints 9 5/8",43.5#,N-80, LSR
DV Col lar
71 joints 9 5/8",43.5#,N-80, LSR
Casing Landed at
-5.81
1370.37 1364.56
1388.44 2753.00
1766.74 4519.74
2214.89 6734.63
+ 2.00 6736.63
2933.37 9670.00
9670.00 '
Casing equipped with Halliburton Float Shoe, H~CO "Self-Fill" Differential
' 9625' 9575' 9465'
Fill Up Collar at 9588' and 22 centralizers at + 9655,, , , ,
9385' 9220' 9140' 8980' 8860' 8170' 8090'-- 7970' 7775' 6650' 6495'
6420' 6335' 6175' 6100' 5930' 5810' and 5725'
Removed BOPE and cut off 9 5/8" casing. Cut off 22.30'. Installed and tested '
landing flange. Packing failed to hold. Removed landing flange.
Februa.ry. 20, 1966
Changed packing and reinstalled landing flange. Tested flange to 3000 psi.
Held ok. Installed BOPE. Flanged up.
.February 21, 1966
Picked up 6 1/4" drill collars and driltrols. Ran in to 6735'. DV checked ok.
Tested pipe rains, hydril and Kelly Cock to 4000 psi, ok. Tested stand
pipe, rotary hose and manifold to 2800 psi - ok. Pulled and laid down 170
joints blank drill pipe.
Ran in and rubbered drill pipe.
CO.M?LETION REPORT Page 9
NAPT'OWNE UNIT #24-8
SECTION 8~ T;.6N. ~.R.8W.o.,. Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPERATOR
February, .22, ... 19.66
Drilled out DV collar and tested same to 2500 psi. ok. Drilled out fill up
collar, soft cement and shoe at 9670'.
Drilled 8 5/8" hole 9670' - 9767'.
Februa..ry 23~ 1966
Drilled 8 5/8" hole to 9919'
FebruarY 24~ 196.6...
Drilled 8 5/8" hole to 10,196'.
Added 60 bbls. diesel oil to drilling fluid.
February 25 - March 7, 1966
Drilled 8 5/8" hole 10,196' '- 12,189'
March 8, 1966
78 pcf. mud.
78 pcf. mud.
78-79 pcf. mud.
78-82 pcf. mud.
Drilled 8 5/8" hole to 12,925'.
Lost 400# pump pressure. Pulled and found one jet missing. Ran new bit.
83 pcf. mud.
March 13, 1966
Drilled 8 5/8" hole to 13,072'. Circulated and conditioned mud for log~.
83 pcf. mud.
~r~ch 12, !96~
81-83 pcf.mud.
Drilled 8 5/8" hole 12,327' - 12,716'.
Drilled 8 5/8" hole to 12,310'.
Lost one cone off bit #39. Picked up junk sub. Reamed (Precautionary)
12,250' - 12,310'. Drilled on junk.
Drilled 8 5/8" hole to 12,327'.
81 pcf. mud.
March 9 - 11, !9~66
COMPLETION REPORT Page 10
NAPTOWNE UNIT #24-8
SECTION 8, T.6N..,. R.8W.,. Seward B 7 M
STANDARD Oil' C'~MPANY 'OF cALIFORNIA' wEs~TE~' 0PE~Ti6~NS'""iNC~ - OPERATOR
Man' 7h 14, !9.66
Ran Schlumberger Dual Induction - Laterolog 13,067' - 9,668', Borehole Com-
pensated Sonic log 13,066' - 9672'., Continuous Dipmeter 13,020' - 9667' and
Cement Bond Log 9668' - 4400'.
Mmrch 15, 19..66
Ran Neutron Collar log 9668' - 5000'.
Ran bit and junk sub. Measured in. Corrected depth 13,067'. Drilled 5' to
correct for drill pipe measurement.
Circulated and conditioned mud at 13,072'/ Recovered no junk.
Ran 7 5/8" Diamond Core head. Circulated.
Cored 7 5/8" hole to 13,075'.
March 16~...196~6
Cored 7 5/8" hole to 13,108'.
Core #2: 13,072' - 13~108'. Cut and recovered 36'.
Ran 8 5/8'~ bit. Opened hole 13,072' - 13,108'.
Drilled 8 5/8" hole to 13,132'.
March 17,- .April 3. 196~
Drilled 8 5/8" hole 13,132' - 14,544'.
83 pcf. mud.
83 pcf. mud.
83-86 pcf. mud.
Apr,! 9, 1,9~6
Drilled 8 5/8" hole to !4,852'.
Circulated and conditioned mud. Ran 7 5/8" diamond core head.
87 pc f. mud.
85-89 pcf. mud.
Apr%l 5-8., 1966
Drilled 8 5/8" hole to 14,777'.
85 pcf. mud
A~r.i..1.4~ !966~
Drilled 8 5/8" hole to 14,586'
Lost pump pressure. Pulled and found bit washed out around jet. Ran new bit.
Drilled 8 5/8" hole to 14,588'.
CO}~LETION REPORT Page 11
NAPTOWNE UNIT #24-8
SECTION 8 T6N~,RS~..~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPERATOR
~pr. il... 10, 1966
Cored 7 5/8" hole to 14,858'.
Core barrel jammed. Pulled
Core #3: 14,852' - 14,858'. Cut and recovered 6'.
Ran 8 5/8" bit and opened hole to 14,858'.
Drilled 8 5/8" hole to 14,918'.
88 pcf. mud.
~A~ril 11-12~ ,196,6
Drilled 8 5/8" hole 14,918' - 15,158'
87-89 pcf. mud.
~pril 13~.1966
Drilled 8 5/8" hole to 15,226' T.D.
Circulated and conditioned mud.
87 pcf. mud.
.A,pr, i,1 ,14, ,1966
Made short trip to shoe of 9 5/8" casing at 9670'. Ran back to 15,226' and
circulated. Had 5' of fill on bottom. Pulled.
Ran Schlumberger Dual Induction Laterolog 15,208' - 13,067', Borehole Com-
pensated Sonic log 15,202' - 13,066'. Pulled tight bottom ~ 450'. One
caliper arm broken (No junk in hole) Caliper no good.
Ran 8 5/8" bit and reamed 15,151 - 15,226'. Approximately 25' of fill.
Circulated and conditioned mud. Made 10 stands wiper run, no tight hole.
87.5-88.5 pcf.mud.
April 15, 1966
Circulated and started pulling. Tight hole 15,136' - 15,056'. Pulled to
15,000'. Reamed to bottom at 15,226'. Circulated and pulled out. Ran
Continuous Dipmeter from 15,096'. Stopped at 14,852' where pill was spotted.
87-90 pcf. mud.
~April 16~ 1966
Made conditioning run and cleaned out bridge 14,560' - 14,978'. Cleaned out
to 15,210'.
Circulated and conditioned mud to 93.5# pcf.
COMPLETION REPORT Page 12
NAPTOWNE UNIT #24-8
SECTION 8 T6N., RS~{., Seward B 7 M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, IN'Ci - OPERATOR
A..pri! !7~1966
Circulated and conditioned mud at 15,226'. Ran Continuous Dipmeter 15,100'-
12,800', and Formation Density log 15,120' - 12,600'. Measured in to 9600'
and laid down excess drill pipe.
93.5-95 pcf.mud
Ap.r..il .18~ !96.6
Ran in open ended to 9909'. Circulated and spotted 30 bbls. high viscosity
gel pill.
Equalized 100 sacks cement through open ended drill pipe hung at 9720'.
Pumped 50 cu.ft, water and "Mud Kil" ahead, followed with 5 cu.ft, water and
748 cu.ft, mud. Cement treated with "Mud Kil". Cement in place at 10:30 A.M.
Pulled 6 stands and reversed out. Top of cement estimated at 9460'.
Circulated at 9400'.
April 19-__~1,
Waited on cement. Circulated and cut mud weight back to 80-82 pcf.
Ran in and located top of cement at 9499'. Cleaned out soft to firm cement to
9516' and drilled out cement to 9550'.
Circulated and conditioned mud.
Effective depth 9500'.
Tested casing and BOPE to 2425 psi. - ok. Pulled out.
Ran Schlumberger carrier gun and shot 4 - 1/2" jet holes/foot 9460' - 9480'.
Made up and ran Halliburton Tester.
HCT #1 PRODUCTION TEST ON PERF'D INTERVAL 9460 ' -9480"
Tota.1 Assembly: 2 outside BT recorders, 5' of 2 7/8" perf'd
tail pipe, "C" type Hookwall packer, VR safety joint, hy-
draulic jmrs, 2 inside BT recorders, hydrospring tester,
5/8" bean and Dual Closed-In Pressure valve.
Ran on 9408' of 4 - 1/2" 16.6~ DP. Used 2426' of water
cushion. Set packer at 9431', with 18' of tail to 9449'
Opened tester at 10;40 P.M. on 4-19-66, for 5 min. pressure
release. Medium strong air blow for 5 min.
Shut in tester at 10:45 PM for 2 hr. ISI pressure period.
Opened tool to surface at 12:45 AM for 30hr. 45 min. flow test
test.
Immediate medium strong air blow with water cushion to sur-
face after 3 hr. 23 min (4:08AM) flowed water cushion next
3hr. 32 rain (7:40AM) when rat hole mud surfaced. Gassy mud
after 40 min; gassy muddy water after next 10 min (8:30AM)
Flowed Gassy water at + 200 B/D rate & gas at est. 10 MCF/D
next 23 hrs. (Turned to flare at 12:30 PM~4-10-66 and fire
burned intermittantly.
Shut in tool at 7:30 ~M for 4 hr. FSI pressure.
Pulled packer loose at 11:30 AM 4/21/66
COMPLETION REPORT Paze 13
NAPTOWNE UNIT #24-8
SECTION 8 T.6N.~ R.8W.~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPERATOR
HCT #1 PRODUCTION TEST ON PERF'D INTERVAL 9460'-9480'
Field Pressure Data:
Depth Gauge IH ISI IF FF FSI FH
Top inside 9417 5538 4929 1635 Clock Ran Out
Bottom inside 9421 5527 4942 1651 4080 4775 5527
Top outside 9441 5511 4959 1735 Clock Ran Out
Bottom outside 9445 5344 4992 1702 4080 4798 5544
Zone wet - Good Mechanical Test
Pulled tester and ran 8 5/8" bit. Circulated and conditioned mud at 9537'.
Pulled.
April 22'& 23, 1966
Ran Halliburton Cast Iron Bridge plug om Schlumberger Wireline and set same
at 9400'. Failed to shear tension sleeve and release. Pulled wireline off
at collar locator. Pulled line. Left shooting head, collar locator and ·
setting tool in hole.
Ran Bowen overshot, engaged and pulled fish loose. Recovered same.
Ran open ended drill pipe to 9400' and equalized 60 sacks construction cement.
Preceded cement with 50 cu.ft, water and "Mud Kil", followed with 5 cu.ft.
water and 735 cu.ft, mud. C.I.P at 1:30 PM. Estimated top of cement at 9250'
Pulled 3 stands and reversed circulation.
Pulled out. Ran Schlumberger carrier gun and shot 4 - 1/2" jet holes/foot
6485 ' -6495 ' .
Made up and ran tester.
HCT #2 ~ PRODUCTION...TEST ON ~ERF'D INTERVAL 64~5'-6495'
Tool Assembly: Same as for HCT #1.
Ran on 6434' of 4 1/2" 16.6# DP. Used no water cushion
Set packer, at 6456', with 18' of tail to 6474'.
Opened tester at 10:40 PM, 4-22-66 for 5 min. pressure
re lea se.
Immediate strong blow of air.
Shut in tester at 10:45 PM for 2 hr. 5 min ISI pressure
period. Opened tool to surface at 12:50 AM, 4-23-66 for
10hr. 20 min. flow test.
Medium to weak air blow w/gas to surface after 4hr. 10 min
Very faint gas blow after next 30 min and continued next
3 hr. 40 min. Surged perf's at lO:10 A.M. w/no appreciable
change in blow. Dead by 9:30 AM and shut in at 10.10 A./
Pulled and recovered 5910' fluid rise (top 270' mud to
muddy water, next 5460' muddy to clear water 60 g/g, next
90' mud and bottom 90' sand).
COMPLETION REPORT Page 14
NAPTOWNE UNIT #24-8
SECTION 8.,. T6N. ,R.8W..., Sewa.rd B &. M..
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPERATOR
HCT #~ PRODU,,C. TION TEST ON PERF'D INTERVAL 6485'-6495' (CONT'D)
Shut in tool at 10:10 A.M. for 4 hr. FSI pressure.
Pulled packer loose at 2:10 P.M.
Field Pressure Data:
DEPTH GAUGE
IH ISI IF FF FSI FH
Top inside 6442 3814 2749 951 2724 2749 3814
Bottom inside 6446 3804 2726 937 2726 2726 3804
Top outside 6465 3787 2736 971 2688 2712 3787
Bottom outside 6469 3831 2724 927 2724 2724 3831
Pulled tester. Ran in to 6550' and circulated and conditioned mud. Pulled.
~pril.24~...1966
Set Halliburton Cast Iron Bridge plug at 6452'. Pressure tested to 2200 psi.
ok.
Ran Schlumberger Carrier gun and jet perforated with 4 - 1/2" holes/foot
6385' - 6400'.
Made up and ran tester.
HCT #3 PRODUCTION TEST ON PERF'D INTERVAL 6385-6400'
Total assembly: 2 outside BT recorders, 5' of 2 7/8" perf'd
tail pipe, "RTT$" type tester packer, VR safety joint,
hydraulic jars, 2 inside BT recorders, hydrospring tester,
5/8" bean and dual closed-in pressure valve.
Ran on 6327' of 4 1/2", 16.6# DP. Used no water cUshion.
Set packer at 6348', with 17' of tail to 6365'.
Opened tester at 9:10 AM for.5 min pressure release.
Immediate medium strong air blow.
Shut in tester at 9:15 AM for 2 hr. ISI pressure period.
Opened tool to surface at 11:15 AM for 3hr. 45 min flow test.
Immediate ~edium strong increasing air blow. Gas to surface
after next 50 min. (12.05PM) Turned to flare and burned with
decreasing flame next 25 min when flame went out. Faint gas
bIow next 2 hr. (surged perf'd at 2:30 PM). No appreciable
change next 30 min. Shut in at 3:00 PM. Pulled and recovered
5505' rise (365' mud, 4960' 34 g/g water and 180' sand)
Shut in tool at 3:00 PM for 2 hr
Pulled packer loose at 5:00 PM.
FSI pressure.
COMPLETION REPORT Page 15
NAPTOW~ UNIT #24-8
SECTION 8, T6N._,_ R,SM Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC. - OPERATOR
HCT #3~ pRODUCTION TEST ON PERF'D INTERVAL 6385'-6400'
Field Pressure data
Depth Ga .u..g..e IH ISI IF FF FSI FH
Top inside 6333 3764 2699 1382 2648 2648 3738
Bottom inside 6337 3804 2 644 1431 2644 2644 3776
Top outside 6356 3763 2664 1520 2640 2640 3739
Bottom outside 6360 3803 2669 1536 2641 2641 3776
Pulled tester. Ran in with bit. Circulated and conditioned mud.
Pulled out. Ran and set Halliburton cast iron bridge plug at 6370'. Pressure
tested with 2200 psi - ok. Pulled.
Ran Schlumberger Carrier=gun and jet perforated 4 - 1/2" holes/foot 6085'-
6095'. Made up and ran tester.
HCT #4, PRODUCTION TEST ON PERF'D INTERVAL 6085' - 6095'
Tool assembly: Same as HCT #3.
Ran on 6031' of 4 1/2" 16.60# DP. Used no water cushion.
Set packer at 6055', with 17' of tail to 6072'.
Opened tester at 10:45 AM for 5 min pressure release.
Immediate air blow increasing from weak to medium strong.
Shut in tester at 10:50 AM for 2 hr. ISI pressure period.
Opened tool to surface at 12.50 PM for 4hr. 40 min flow' test.
Immediate medium increasing air blow with gas to surface
after 1 hr. 15 min. (2:05 PM) turned to flare and blowed
with decreasing 3' flame next 25 min. (2:30 PM). Dead next
10 min. then faint gas bubbles next 1 hr. 50 min. Surged
perf's (4:30 PM) No appreciable, change for duration of
test. Pulled and recovered 5310' fluid rise(90' mud, 5040 · .
max 450 g/g water and 180' sand.)
Shut in tool at 5:30 PM for 2 hr. FSI pressure.
Pulled packer loose at 7:30 PM.
Field Pressure Data:
Depth Gauge IH ISI IF FF FSI FH
Top inside
Bottom inside
Top outside
Bottom outside
6041
6045
6064
6068
3586 2496 1711 2496 2546 3586
Chart no good - stylus did not mark
3595 2545 1854 2545 2545 3595
Chart no good - stylus did not mark
Pulled tester.
COMPLETION REPORT Page , 16
NAPTOWNE UNIT ff24-8
~ECTION 8,_~T6N., R;..8W. Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA WESTERN OPERATIONS, tNC, - OPERATOR
April 26~ 1966
Ran bit and circulated and conditioned mud. Pulled.
Ran Baker Mod. N. bridge plug on wireline and set same at 6040'. Tested
plug w/2000 psi - ok. Ran open ended drill pipe and equalized 75 sacks
cement treated with "Mud Kil" on top of plug at 6040'. Preceded cement with
50 cu.ft, water treated with "Mud Kil" followed by 5 cu.ft, water. C,I.P. at
11:00 AM.
Circulated at 5000'. Located top of cement at 5883'. Equalized additional
75 sacks cement at 5883' (Minimum of 200 linear feet of cement required.)
preceded with 50 cu.ft, water and followed with 5 cu.ft, water. C.I.P. at
12:00 PM.
April 27, 1966
Circulated. Estimated top of cement plug at 5683'. Pulled to 217 and
equalized 75 sacks cement treated with "Mud Kil". Preceded cement with
5 cu.ft, water. Displaced with water. Cement in place at 7:00 PM. Well
plugged and abandoned at 7:00 PM, 4-27-66.
Rig released at 12:00 Midnight, 4-27-6
COMPLETION REPORT
NAPTOWNE UNIT #24-8
SECTION 8 T6N., ~ Seward B & M
STANDARD OIL COMPANY OF CALIFORNIA, WESTERN OPERATIONS, INC.
Page
- OPERATOR
DEPTH DEVIATION
137 0°15'
227 0030'
487 0050'
800 0 o 15 '
1,9.54 0030'
1,631 0030'
2,000 0 °45 '
2,435 0 °45 '
9., 930 0 °30 '
3,462 0 °15 '
3,955 0°15'
4,694 0 °30 '
5,111 0°15'
6,030 0 °00 '
6,551 0°15'
6,800 0 045 '
7,062 0045'
7,183 0 °30 '
7,371 1°00'
7,565 1°00'
7,696 0 °45'
8,040 0 °00 '
8,420 0°45'
8,779 0045'
9,667 1 °00 '
9,919 1°30'
10,732 1°30'
11,362 1°00'
12,310 1°45'
DEVIATION DATA
SCHLUMBERGER
~ WELL
I
~i~laOl FIELD
COMPANY STANDARD OIL COHPANY OF CALIFORNIA
RECEIV[D , '
MAY 1 A 1966
NAPTOWNE UN I T :,i,-24'-8
~ DIVISION OF MINEB~& MINERAI~.
W I L D C A T ..... /d~]-IORAGE .
COUNTY , 'KENAI, BOROUGH
LOCATION (Sol,4.)
Permanent Datum: G. L.
Log Measured From. K,_B.~_ ...... ,
Drilling Measured From K, B.
Date- - 1 7- 66'
Run No.- E
J ' Depth-L-Driller ]2000
Depth--LOgger J2000
Btm. LOg Interval: 'jl 996
J Top Log Interval J 1 96
I Casing-, Driller
Casing- Logger '196
Size '~-~J
EL:. &
TER
Dens. Visc.. 58
.5
,,,STATE ALASKA
Other ServiceSi '
BSL ,FDC ,CDM
CST.NL ,CBL
Rm C~ Meast Temp.
Rmf ~ Meas. Temp.
R mc. ~ Meas. Temp.
Source: Rmf Rmc
R m (~ BHT
Yi-~-~
6N Rge.. 8W '
·
, Elev. . . Elev.: K.B. 280'
Ft. Above Perm. Datum. D.F ....
G.L.__
2- 3-6.6
TWO
7460-
7456
2000
~!98 @2000
2000
'J II
XP-20
SPERSENE
Max. Rec. Tam
IRCULATED
@7 °F
93 @ 78 o
1.1 @ 80 °F
7945 47
9°2
CIRCULATED
2_16_66 -14-6'6"
Location 562
:FMAN
THREE - UR
2
9672
3071
306 7
9668
4500
13~ @2000 Jg~ ~ 967()
- - - 19668
_ . ,
II I!
XP- 0 P- 20
,.
S ENE PERSENE
55
9.2 ,,2 mi
Witnessed :G E E
3,59 @ 52 °F
2.75 ~,7 55 °F
3.82 ~ 52 °F
M I
CIRCULATED C I RCULATt l)
2.06 ~)60 °F "F
m) 51 °F1.09 ~," '
2.86 m~51 °F .0 m}68
I M M I'M.-
oF
o F
oF
oF
oF
4-14-66
FIVE
! 5226
._!..5212
1.5208
13_067
_'-)~ @9670
X P-2.Q_,_B_~_~_I T
?7._s !60
;).~.0 I 3:0_~nl
CIRCULATED
1;25 @80 oF..
0,.92 ~ 65°F
1,95 ~ 65°F
I',1
_,.43 @ 80 °F 1 @ 1 3~F 91 (h) l 34 65 (~;' 16',"F O
4 HRS ' HRS,
°F 1 34 ,°F 5 F 1
2562 ,LASKA 2562 J~LASKA Aj[IASKA 2
MALLARY MALLARY ESS
M~-~-.d~E AND SCOULFR MCGEF--
__IM
,, 56 @ 1 78 °F
ItRS.
°~'
!:,(, 2
ARKS
~'BL
280'
9500
;6
§600i 9700
F
F
F
4-. '~ 4-66_.
t' !.VE
152_26
~ s.2o8 . ' ....
:.0 ....... L3...O
L IRCULATED
t .!)5 ~ 65°F~
x t ...... ~ ................ .-" ~ _'% ~- ~ .
.
,.
.
.
. ...... -, ,
I · ~
.
EXPLORATION DEPARTMENT
ANCHORAGE DISTRICT
R. I. /EVORSEN
DISTRICT SUPERINTENDENT
P. O. BOX 7-839 ANCHORAGE ALASKA 99501
~,~ay 16, 1966
STANDARD OIL COMPANY OF CALIFORNIA, OPERATOR
NAPTOWNE UNIT 24-8 WELL
SECTION 8, T-6-N, R-8-W, S.N.
KENAI PENINSULA, ALASKA
TRANSMITTAL OF CORE SAMPLES
State of Alaska, Department of Natural Resources
.Petroleum Branch of Division of Mines & Minerals
~000 Porcupine Drive
Anchorage, Alaska 99504
Attention: M~. T. R. Marshall~ Jr.
Gentlemen:
We are transmitting under separate cover core samples from the
above well from Cores ~l, ~2 and ~3. The intervals cored and
sample depths are ~sted below:
Core ~1 - 8894-8934' Sample Depths; Sampled every
foot through interval.
Core ~2 - 13,072-13,108' Sampled every foot through
the interval.
Core #3 - 14, 852-14, 858 ' Sampled every foot through
the interval.
Please hold this material in a confidential status for the
prescribed two year mi~mum period.
Very truly yours,
R. I. Levorsen
DI~: sc
DiViSiON OF .MINES & MiNERA¢
ANcHOR,~GE
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
_
LESSEE'S MONTHLY REPORT OF OPERATIONS
State Alaska 6~o~niy Kenai Borough Field Exploratory
~'t~e followir~ is a eorreot report of operations an~t prodaetio~ (i~eludin~ d~lli~ a~d prod~ei~
wells) for the mo~th of April ............................................................................
.......................................... ,19.~.~.., Standard 0~1 Company of Calfforn~a
.............. .................. ~ox.~.A~aaka..9.9.~0.1 ............... / / ':'/ ~ / :~'~-/ .... '/ '~
Pko~e .....................~.~...~...~.~.[ ........................................ JEe~t'a tftle .... ~,,u 5~- ~ L -~~eende.~ ....
8uC. &tqm Ou. FT. O~ GAS
~ or ~ TW~. RA~OB Wz~ Dau O~s OF Ba~ 0r REMARKS.
~VBRBD non0,
-- , .................
8 T6N R8W Drilled 8 5/8" hole 14,401'=14,85~ '. Cored 7 5/8" hole to
14,858'. Drilled 8 5/8" ~ole to .5,226' ~.D. Ran. D.I.L.
Sonic Log CDM and FDL.
Spo~ed a high viscosity gel pill at 9909'. Equalized 100
sacks cem,~nt t~rough open ended d=:ill pipe at 9720'. Pulled
and circulated.~ Located top of c~ment plug at 9499'. Clean
out cemen: to ~550". Shot 4 - ¥' holes/feot 9460' - 9480'.
Ran HCT #L. F~ ~ed
9400' and equalized 60 sa~:ks ceme~t on top of bridge plug.
Shot 4 - 2" ho]es/foot 64~5' - 64~5'. Ran HCT ~2.
Recovered' 5910 muddy - clear sal~ water, testing 110 G/G.
Set brldg~ plu~ at 6452'
Shot 4 - ./2" ~oles/foot 5385' - ,400'. ~an HCT #3:3 hrs.
45 mtn fl~ te(t. Recovered 4960 muddy salt water (testing
120 G/G). Set bridge plug at 637()'. Shot 4 - 1/2" holes/fo,
.. 6085' - 6~95'. Ran HCT #~: 4 hr~. 40 mi~. flow ~est.
Recovered 5040 muddy, salt water and sand ([es[Emg 450 G/G.',
Condi~iom~d hole to 6150'. Se~ b:,idge plug at 6040'. Equali:
75 sacks :emenl'on top of bridge ,lug. Located ~op of cemenl
a~ 5883'. Equ~ limed addi~ional 7~ sacks ~emen~. Estimated
p.ISTRIBUrIQ~ ~op a~ 56;3'. Pulled. gtualized 75 sacks cemen~ a~ 217'~
Had cemen' returns to surface.
U. S. G. S..~ W. J. l[nton Rig relearned
REC :IV[D
z. 1966
File
,.. , , , ~, , ,. .. , , , , ,, ,., .,. ,,. ,.
,zed
i
,
ANCHORAGE
No~.--T~em were ................................ ru~ or mdea of Oil; ............................... .! ............ M em. ft. of ~aa aold;
............................................. ~ ~ ~m ~ ~e d~g the month. (Wfl~ "no" when ~ppH~bl~)
Nor~.--Ro~ on ~ fo~ k ~~ for ~eh ~en~ month, ~~ of the s~t~ of o~ratio~, and m~t ~ ~ in
duplica~ with the ~~r by ~e ~h ~ tho ~~ mon~ ~ o~~ ~m~ by tho ~v~r.
~ 9-8~ .
, , ~...,~.-~ ..
.
.
·
EXPLORATION DEPARTMENT
ANCHORAGE DISTRICT
R. I. I. EVORSEN
DISTRICT SUPERINTENDENT
P. O. BOX 7-839 ANCHORAGE ALASKA 99501
M~y 13, 1966
S. O. COMPANY OF CALIFORNIA, OPERATOR
SECTION 8, T-6-N, R-8-W, S.M.
KENAI PENINSULA, ALASKA
DUAL INDUCTION-IATEROLOG & MUD LOGS
State of Alaska, Department of Natural P~sources
Petroleum Bran~ of Division of Mines & Minerals
3000 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. T. R. Marshall, Jr.
Gentlemen:
We are transmitting:
gAT 1 4 196~
DIVISION OF MINES ~ MINhRAL8
ANCHORAGE
1. Dual Induction-Laterolog from 196-15,208'
2. Mad Log from 225-15,226', T.D.
One sepia of each of the 'above and one blueline of each of
the above are enclosed. Please hold this material in a
confidential status for the prescribed two year minimum
period.
Yours very truly,
L'
R. I. Levorsen
ABS:sc
STAT/ ALASKA. SUBMIT
(Other instructions . re*
OIL AND GAS CONSERVATION COMMISSION Terse Mde)
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use tbts form for proposals t° drill or to deepen or plug bask to a different reservoir.
Use "APPLICATION FOR PERMIT--" for such propo~alL)
':"L ~-, o,s [-] Exploratory
WELL L_J WELL OTHER
NAME OF OPERATOR
StandErs 0il Company of California, W.O.I. - Operator
8. ADDRm~BB OF OPERATOR
P. 0. Box 7-839, Anchorage, Alaska
4, LOCATZO~ O~ WELL (Report location clearly and In ae~rdan~ with any 8~ r~uirements,s
S~ also space 17 below.)
At BU~PCe
8~7~ North and 15~~ East from Southwest corner of Section
T6N, ~W, S. B. & H. '~
14. ~mn~IZT NO. J 15. S~Vi~OSS (S~w wh~er DF,-~, ~ ~)
280' ~
Effective: July 1, 1964
~. LEA~E nme~eN,T~5~- ~"~n~iL NO.
A-029044
6. IF INDIAN, ALLOTTEE OR TRIBE NAME
7. UNIT AGREEMENT NAME
Na ptowne Unit
8. FARM OR LEASE NAME
Naptowne Unit.
9. w~r~ NO.
24-8
10. fIELD &ND'POOL; OB WILDC&~
Wildcat
mURVBT OB &aBA
8-T6N,R8N~ S. B. & M
12, BOROUGH - '[ 18. ETATE
~enat Borough[ Alaska
16.
Check Appropriate Box TO Indicate .Nature oF Notice, Report, or Other Data
NOTICE OF INTENTION TO ** EUBfJEQUBN~ BEPOR~ OF'i
FRACTURE TR[~'AT MULTIPLE. COMPLETE
SHOOT OB ACIDIZE ABANDONe
REPAIR WELl, CHANGE PLANfJ
WATER SHUT-OFF
FRACTURE TREATMENT
SHOOTING OR ACIDIZING
(Other)
REPAIRING WELL
ALTERING CAEING
ABANDONMENTe
(NOTE: Report results of multiple eomp_leflon on Well
(Other) Completion or Recompletion Report and ~o$ form.)
IT. DESCRIBE I,RO~OSED OR COMPLETED OPERATIONE (Clearly state all pertinent details, and. ~ive pertinent dates, including ~amated date of eta~tlng an;
proposed worM. ~e well is dlr~tionally drilled, give subeurraoe ioeatAons and measured and true vertical depths for ual markers and sones perU-
nent to thio work,) . ·
lo
e
Set bridge plug at 6040'.
Equalized 75 sacks cement at 6040'.
Equalized 75 sacks cement at 5883'.
Top at 5883'
Top est. at 5683'
4. Equalized 75 sacks cement at 217' to surface.
Rig released at midnight 4-2'7-66. Abandonment marker will be-installed and
location cleaned up after rig has been moved off location. '
A~g to be off location within 90 days from time of zig release.
'2 "
..
RECE/VEO,! ,:
-. .,
DIVISION OF MINEs & MINE~ ' '
ANC~OE~C~ ,'~
szo~o~ TXTLnDtstr~ t SuEerintendent
(This mpa~ for F~eF~ or BM~ o~ nM)
APPRO~D BY ,,, ,, TI~
CONDITIONS OF ~PROV~ ~ ~ ~
*See Indmctions on Reverse Side
Form P--3
STATE/~'' ALASKA SUBMXT IN TRZP'r,,,I~'"~®
(Other instructions r~
,~IL AND GAS coN~ERVA~ON COMMISSION ver~e ~de)
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not u.e this form for proposals to drill or to deepen or plug back to a different reservoir.
Use "APPLICATION FOR PERMIT~" for such proposals.)
OIL ,~--'-~GA8 []
w~L ~ i w~L,~ OTHER Exploratory
2. NAM~ OF OPERATOR
Standard 0il Company of Cal[fornia~ ~esgern Ooerations~ Inc.
8. ,~oa~ss or
LOCATION OF WELL (Rep6r~ location cleVis'and In accordance with an~ 8~ r~ulrementa.*
S~ also 8pace 17 below.)
At surface
827' North and 1546' East' from Southwest Corner of Section 8,
T. 6N.
PERMIT NO,
16,
I15. EI, BVATIONE (Show whether DF, wr, OB, ets.)
280' K. B.
Effective: July 1, 1964
§. LEASE DESIONATION AND SERIAL NO,
A-029044.~,:'~
~. IF INDIAN, ALLOTTEE OR TRIBE NAME ~'
7. UNIT AGREEMENT NAME
Naptowne Unit
8. FARM OR LEASE NAME
Nap ~owne Unit
9. W~LL NO.
~24- 8
X0. FIELD AND FOOL, OR WILDCAT
W~ ldent
SURVB! OR AIEA
8-T6N-RS~. ,. SB~
12. BOROUGH ,, '[ 18. STATE
(enai B. qrou~hJ Alaska
Check Appropriate Box T° Indicate .Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT*OFF
FRACTURE TREAT MULTIPLE. COMPLETE
SHOOT OR ACIDIZE ABANDON°
REPAIR WELL CHANOE
(Other)
SUBSEQUENT EEPOBT OF:
FRACTURE TREATMENT ALTERING CASINU
SHOOTING OR ACIDIZING ABANDONMENTe
(Other)
NoTE: Report results of multiple completion on Well
ompletlon or Recompletion Report and .LoI~ form.)
lT. DESCRIBE PROPOSED sa COMPLETED OPERATIONS (Clearly state all pertinent details, and give. pertinent dates, including e~timated date of.startinfr an~
proposed work. If well is dlreotlon~lly drilled, wive subsurface loemtlons and mealttrea and true veztieal depths for all markers aaa SORES perti-
nent to this work.) ' Confirming telephone conversation Whitney/Marshall 4/24/66.
Present Status: 20" cemented at 198'
13 3/8" cemented at 2000'
9 5/8" cemented at 9670"
Total Depth 15,226'.
1. Cemented plug 9720'-9550'.
2. Perforated 9460'-9480' and tested (HCT Y)I)-
3. Set bridge plug at 9400' and equalized 60 sacks cement.
4. Perforated 6485'-6495' and tested (HCT ~;2) o
5. Set bridge plugat 6452'.
6. Perforated 6385'-6400' and tested (HCT ~)3).
7. Set Oridge plug at 6370'.
8. Perforated 6085'-6095' and tested (HCT ~)4).
NOTE: All zones tested were wet and non productive.
Propose:
le
2.
3.
4.
e
Estimated top of cement at 9250'.
·
·
RE:CE IV.E D
MAY' :41966
.:
DIVISION OF MINES & MINERAL5
Set bridge plug at 6040'. ANCHORAGE
Equalize 200 linear feet of cement on top of bridge pl
ug.
Equalize 200 linear feet of cement at surface.
Weld on plate on 9 5/8" casing flange with abandonment marker according
to U.S.G.S. and State Requirements.
Subsequent notice to follow.
18.1
hereby
certify that~tlle/foregoing/is truo/and,~orroet
SIDleD \, ' ':'q k '/.?" : ;' ,.:-':'2':~/ /~'/~f" 'TITLE
C.' V' C}IATTERTON / ,
(This space for Federal or State office uso)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANT ~
District S. uoerintendent...
-
esee Instruction. on Reverse Side
·
4/,28/66
,.
ERLE MATHIS
Minerals Officer
RECFIVED
APR ~ 6 1966
DIVISION 01: MINES & MI~RAt3
ERLE MATHIS
Minerals Officer
RECEIVED
APR 2 ~ 1966
Kl~cjh
STAT'/-"'F ALASKA s'c;,~.~:~' ZN
(O~her tnstructl,m~
OIL
AND
CON52RVAY~ON ................ ,-,;," verse side)
SUNDRY NOUCES AND .~.rw~,~ ON WELLS
(I/,, nat u~e this form for proposals to drill or to deepen or Diug' back to a different reservoir.
U~e "APPLICATiOiNr FOR PERMIT--" for such
o~=.,,:,:~ ~- o~w~:~= ['-] OT~ER Exploratory
Standard Oil Company of California, W.O.I "
P. O. F. ox 7-839, Anehoraga, Alaska
LCC;.T~OX 0~.~ WZLL (Report location clearly and, in accordance with any State requirements.'
also ~pace 17 below.)
~527' North and 1544' East from Southwest corner of Section 8,
T6N.
Effective: July i,
5. LEASE DiLBiGNATION AND g'.'-~.l.~L
A-0290~:.4
6. l~ INDIAN', ALLOTTE~ O1l T~i~ NAM~
15. ELEVATXON~ (Show whether D1% RT, Gm, etm) .
280' K.3.
7. UNiT AOi~E:.'.MENT N~?,i'E
Na,otowae '~ai c
8. FAIt,~I Og L~AS}". NAM~
Na ~ t ow ae U n i t
9. W~L ~o,
24 -3
10. FieLD AND POOL, OR WILDCAT
Ui!dca t ·
$-T6N - R3W, S B & l,{
12. BOROUGH .. 'J 18. aT~
:anal BoroughJ, Alaska
·
C~e¢4 Appropriate Box T° Jndica~e Nature o[ Notice, Repoe,, or O~4er Data
NOTICE OP INTENTXON TO :
] i
TEST WAT%ii SHUT-OFF J
2'Lwl CTU~& TREAT } ,,
~,EPA!~ %V~LL
(o:~ar~ 72~ ,~(,back
PULL OR ALTER CASING
MULTIPLE. COMPLETE
ABANDON$
CHANGE PLANS
SUBEEQUEN~ REPOg~ O~:
WATER SHUT'0FI1~ ; REPAIRING W~LL [ '
FRACTURE TREAT',~ENT ALTERING CAgiNG
SHOOTING Oa ACIDIZXNG ABANDONMENT*
(O~her) ~ ,,~
Report results of multiple comple'clon on Well
~ompletlon or Recompletlon Report and Log form.)
17. D~:SC:UU~; PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of star:lng any
pw,po~ed work. If well la directionally drilled, give subs~ace lo~tions and mea.sured and true vertical depths for all markers and zones per~l-
ncn~ ~ ~ia work.) · ' '
Confi::v:..:Lng telephone conversation Whitney/Marshall, April 13, 1966
?~esenu S'2atus:
20" cemented at 198'
13 3/8" cemented at 2000'
9 5/8" cemented at 9670~
Total depth 15,226'
i~o z':~dicacion of hydrocarbons below shoe of 9 5/8" ca=in%
REC Et. VED
APR-18 !966
.
DIVISION OF MINES'& MINERAI.,B
ANCHORAGE
Propose '
· '"= - 9550 '
1 Place cement plug across shoe of 9 5/8" casz,o 9750' '
2. Leave open hole below cement, plug full of heavy mud. '
e
e
Clean out and condition mud to 9500'
·
Perforate and test intervals 6460' - 6470' 6335'-6345'
6170' 6180' and 6085'" 6095' · '
.
°=~o-m additional tests as required, complete as .gas well'
discovery or abandon par supplementary notice. I ' '
TITLE
TITL~
Superintendent
~xT,~' J. pril 14. 1966'
*See in~rucfioa~ on ~eve=e 'Side
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
J,,
LESSEE'S MONTHLY REPORT OF OPERATIONS
~"/~,,~ f;c;llowinff is a oorreot rcpor~ o! operatior~s and prod~etior~ (i~el~din~ drillin~ and producir~
for :~ke mon~k of ............ ~.F.~.~ ...................... 19_.~, _~.g.~_n~_r~__~L.~n~n~._~L~!~r~ .......
'~c~,,~.'saddr~s P.O. Box 7-839 Comoan- West~,'p~er~tions, Inc.
................................................................... r ~ 'T~ ....:; 7,: '7' .~7:.-.:~ ........
~. ., ,.. ~'...~':-,/ ,. .,,
........................... _~h~g~.__6!~__~95.QL ............ ~d .... f__..:._~ ~ ~.:~:.,.~ ...... :.:.:~ ........ ~ .... .: .....
- ~-~ c~ v ~-C~~RTO~
~c. ~.~p ~ TWT. Baa~ O~ OIL O~. F~. o~' (lAS
~,~ os' ~' (In thousands)
~ T6N
NAPTOWN~
?Dri::I'1ed h::ole<: I0,9
"LogS'. I" hole
cut and 36',
drilled
Drilling
DI
U. S. G.
State -
C.W, Pe
R, R, gil
R. I.
File
J. Lint,
.ha 1 !
OALLON8 OF
RBCOVBltBD
UNIT #2
'9' - 13,
13,072 -
)pened hc
BARRELS OF
WATBB (Ir
none, m mM)
6-8
072'/ RIn Electric
13
,108'. Core __~Z,
le to 8-i/8" and
-,
R.:C Et:.V [ D
·
~PR 11
DIVI',SI( N OF MINES & MINE~
~O~GE
NoTs.--There were ......... . ......................... rum or sales of oil; ............................................. M cu. ft. of ~ sold;
.................................................. runs or sales of gasoline during the month. (Write "no" where applicable.)
..... Report on this [orm is required for eaoh oalendar month, r~gnrdlea8 of the status of operntions, &nd must be filed in
with the Jup~rvisor by the 6th o! the suoesodlng montl~ unleea othervflee dlm0t~l by the supervisor.
t~-~-~ e.O. ~qffltllllllN1 ,'IIrlNTINk OfflflCe'
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
LESSEE'S MONTHLY REPORT OF OPERATIONS
wel~) for tAe mo~tk
_ ~esCern 0pera~tons, Inc.
~dent' ~ ~ress ..... '.,_._'.,.'_'-,.,_.'.,.'.'-'- ............................... ~'ompany ................. O I~I~'~2~ ................
................................ ~~~..~~. ........................... ~~ ............... ~..~.~~ ..........
~ ..................... ~:~_ ............................................ ~'. ~ ..... .~~~~.~.~...
r
~ GALLONS O~ Balm or REMARKS .
Or. Y~. o~ OAs
8~. A~ ~. ~NGB ~O. ~VoBD R~TBRBD ~o~e, ~ s~) ~t~t of
,.
,,
S~ C0~~~L - ~T~ U~ZT ~24-~
8 ~6N R~ Drilled 1:'%" hcle 7276'-7,~58'. R~n logs. Drilled 12~"
hole to 8/~9~', Cored Cor~ i~1 889l *-8934*. Drilled ahead
to 9670~. Ran logs. ~oo]~ Side,al I Samples. ~n and
cemented ! 5/8" casing a~ 9670~ ~ th 800 sacks cement around
shoe and t.00 sacks throug~ DV at t735~, ~installed and res
ed BO~E. Drilled out DV ~nd tested to 250) psi -
Drilled o~t c~ent and sh)e and d~illed 8 ~/8" hole to 10,9~
D.riiltng ~ ,head.
~a~e - ~. Earshall
C. ~, Per~y
R. R.
' R. ~. Lev~rsen
File'
.
-. ..
.
..
N~yr~.--There were ..................... rum or / ~ oil; M eu. ~%. of g~ ~old;
....................................... ,. ~m ~ ~ ~ g~ d~ t~ ~nth, (W~ "no" w~ appU~ble.)
No~.--Re~ on t~ fo~ k ~~ for ~oh ~en~ mon~, ~~ ~ t~ ~t~ of o~atiom, and m~t ~ fl~d in
dupH~te ~th the su~r by the 6th of t~ succ~g month, ~ o~m di~0~ by the su~rv~r.
~ ?: C ~ IX/[':U ............
UNITED STATES
01¥1sto~ o~ ~_s ~ ~!~C~DEPARTMENT OF THE INTERIOR
· ANCHOP-~O~- GEOLOGICAL SURVEY
LESSEE'S MONTHLY REPORT OF OPERATIONS
;State ....... A.l.a~ska. .............. Oo~ntll _./~enat..R~ugh ....... i~e/d ........ ~.~9~¢~.9.~ .....................................
~e follo~g ts a oorreot report of operations a~d prod~ot~ (l~ol~dt~ d~lli~ a~d prod~oi~
wells) for t~e mo~t~ of ........ ~~ .... ~ ............... ,19.~_, ...... ~D~_.~.;..~.9.~...9.g...~.~.~.g.~-
~dent'saddress P, O, Box 7-839 ............. Oomnanu ~S~e~'~e~P~s~ Inc.~.
r ~ .... ' ~ ..... ~' ''* ........ ~7'~ .................
.................................................... ~. - v*'z-~rr-~%~, -:,-:,~2
Anchorage, Alaska Signea ._~_~_~_~:z:z:-z-.',:--~,{~ .... ,--:-/: .... : ....
~~ .............................. ~'~:-~'~'i ...................................... ; -., - ~- ~ ~=~=- -
G~I~ONS OF Biml~ or REMARKS
OU. FT. OF OaS (If ~, ~: ff shut ~wn,
W~ D.u BAB~ Or O~ Q~ G~ WAT~S (U
.,
8 T6N ~ Spudded Januar, 9, 1966. Dr~ed 13 3/4'* ho~e ~o 228*.
~ened hole ~o 26" ~o 22~* Cemented 20" casing a=
with 550 sacks cement. ~'~nged up. Ins~lled and ~es~ed
BOPE. Drilled 12%" hole ~o 2000', r~ Du~31 Induc~$on
La=erolo~ and ;onic Log. Opened hole ~o t8 ~/8'* ~o 266'.
~$s~ed cfr. ~ecovered ~ish and opened h,~le =o 2000',.
Cemented ~3 3/~** casSng ~ 2000' ~$~h 220~) s~c~s
cemen=. Flanged up. Te~ed BOPE ~o 2~00 psi. .Dr$~led
12%" hole to 7 ~76'0
Drilling ~ead
DXSTRXB~ ION:
~ , USGS -.~. ~. L [neon
'~CaCe ~. R. ~rshall
C. ~, Pe~
R. R. Ritcer
E~ loraC ion *De ,C.
.
File
,,
.
.
.
, ,,
.
:ion
NoTB.--There were ......... runs or his of off; ........................................... M o,. fi. of fir fold;
runs or rodeo of gasoline during tho month. (Write "no" where sppllosble.)
NoTn.--Repor~ on this form is required for e~oh oalendar mon~h, regsrdles8 of the ststus of operations, and must bo filed in
duplicate with the supervisor by' the 6th of the suooeeding month, unlees otherwise direoted by the supervisor.
'~(YLs]3~ 9-8~9 I&,---~f[,?O6-8 U. $. GOVflINMIE#T PIIINTINi OFFICE
(Jmuusry 19ilO)
Anchorage, Alaska
December
27~
1965
Standard Oil Company of California~ Operator~ and the
Richfield Oil Corporation~ announced today that they will
drill their Naptowne Unit No. 24-8 in Section 8~ T'6-N~
R-8-W, S.M.
The well is planned to be a deep test to approximately
15~000' and is located on a separate geologic structure
approximately 8 miles southeast of the Swanson River Field.
Coastal Drilling Company has been awarded the drilling contract
and will ~use their drilling rig which completed the Standard-
Richfield Birch Hill Unit 22-25 gas well in June 1965. The
rig is currently being moved from the Birch Hill location
about 3 miles north of the Swanson River Field, It is anti-
cipated that the Napto~me well will be spudded shortly after
the first of the year.
NOTE: Correction 'of Township and Range
should read T-6-N, R-8-W, not T-6-N, R-6-W
~~ 3, ~3, ~lt ~' 6~-X7. ~ nee
Very tnLty yours.,
Form
SLATE OF ALASKA
SUBMIT IN T~ ~ICATE*
(Other instru~_ ~ns on
reverse side)
OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR PERMIT TO DR, ILL, DEEPEN, OR PLUG BACK
la. TYPE OF WORK
DRILL IX] DEEPEN 1-] PLUG BACK I-]
WELL WELL OTHER ZONE ZONE
NAME OF OPERATOR
Standard Oil Company, of California, Western Operations~ Inc.
ADDRESS OF OPERATOR
_jlL_0~ox 7-839, Anchorage, Alask~ 99501 ' ·
At surface 827 North..and 1544 East from Southwest Corner of
Section 8, ~fe 6 N., R. 8. W., S. B. &M
At proposed pro~.
Effective: July 1, 1964
LEASE DESIGNATION AND SERIAL NO.
A-029044
O. IF INDIAN. ALLOTTEE OR TRIBE NAME
~.' UNIT AGREEMENT NAME
"Naptowne Unit
3. FARM OR LEASE NAME
r Na~owne Unit
9. TELL'NO.
24-8
~0, FIELD ANr~ PO0to OR WILDgAT
~ll. SEC., T., R., M., OR BLK.
AND SURVEY OR AREA
8-T6N-RSW., S.B.&M
14. DISTANCE ZN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICES 12. B.0ROUGH SS ] 13. STATE
-+-14 miles Northeast of Soldotna Kenai
Alaska
1~. DISTANCE FROM PROPOSED' 16. NO. OF ACRES IN LEA~E 17. NO. OF ACRES ASSIgNeD
LOCATION TO NEAREST TO THI~ W~LL
PROPERT~ OR LEASE LINE, FT.
(AI,o to nearest drlg. unit line, if any) 827 ' 2560 .....
~8. DISTANCE FROM PROPOSED LOCATIONS 20. ROT~Y 'OR CABLE TOOL8
TO NEAREST WELL~ DRILLING, COMPLETED~
22J ~PROI. DATE WORK
December 20, 1965
21. EL~VA~0NS (Show whether DF, RT, GR, etc.)
265' Ground Elevation
z9. PROPOSED DEPTH
12,200 '
23. PROPOSED CASING AND CEMENTING PROGRAM
sIZE OF HOLE WEIGHT PER FOOT QUANTITY OF C~MEN~ .
SIZE OF CASING
26" 20"
I~ 5/R" ' 13 3/R"
12 l/4" ] ~ 5/8"
79#
61f; & 68#
43.5#
SETTING DEPTH
200'' · 400 sacks
~:2000 ' . ~2000 sacks
· 8500' ~:2000 sacks
1. Drill to 200' and cement conductor.
2. Install and test BOP, drill to ~-2000', log and cement 13 3/8" surface pipe.
3. Install and test BOP, drill to ~8500', log and cement 9 5/8" protective string.
4. Install ar~ test BOP, drill co ~:12,200', log and core as necessary.
5. Run 7" or 5~" if warranted a~i test.
6. Complete or abandon as indicated by logs, tests, etc.
R,E(FIV[9
' ANCHC)~AGE
IN *~O~ S~e~ D~Se~ ~O~OS~ ~aO~: ~ ~ro~osal Is t~ 4epen or ~lu~ bae~, ~l~e data ~n present ~ro4ucll~e lone and ~N~se4
zone. H propos~ is to drill or deepen dlrectlon~ly, give pertinent data on subsuHace locations and measured and ~ue ver~cal dqpths. ' Give blowout
preventer program, ff any.
,.e,,, / ~:',/, ( ~-/x':~:~:~.~ ,,,L, Dietric~ Superintendent ~,,, December 2 1965
(This space for Federal or State office use)
PERMIT NO. . ,
CONDITIONS OF APPROVAL IF ANY
*See Instructions On Reverse Side
Anchorag% A~aska
September 9, 1963
PRESS RELEASE
Standard Oil Company of California, Western Operations, Inc.,
as operator for itself and the Richfield Oil Corporation, today announced
its intention to drill an exploratory well on the Eenai Peninsula
approximately six miles north of Naptowne, and seven miles southeast of
the Swanson River Oilfield. ~he well has been designated Naptowne Unit
~.8.. The Surface location will be approximately 800' North and 1700'
East from the southwest corner of Section 8, Township 6 North, Range 8
West, S.M. The area has been given unit designation approval as the
proposed Naptowne Unit by both the State of Alaska and the United States
Geological Survey. Standard will be operator of the proposed unit.
Grading of three miles of road at the location is being completed.
Rowan Drilling Company has been awarded the contract for the well which
should spud by approximately October 1st.
..,
be ,suppl~ vl~h a ,ooeplm ~. ~f ~l ~
FOR TO DRILL,
A~PLICATION PERMIT DEEPEN OR PLUG BACK
. ' APPLICATION TO DR!!~'L',~ DEEPEN [] PLUG BACK []
NAME OF COMPANY OR OPERATOR DATE
Address
' ~-'~ :' :----: : :~ : ~)iq, SCRIPTION OF WELL-AND LEASE
Elevation (ground)
~Vell location ',' ~ - ' ': - . ,' ~ (g,i~e footage from section lines) Section--township~range or block & survey
Distance, in miles, and direction from nearest town or post office . ·
Negrest distance from proposed location Distgnce ,from propose~ location to nearest drilling,
to properly or lease line:, completed or applied--for welt on' the ~ame lease:
. . ~ ... .... ~. '~.~
feet
Proposed depth:
· ' ~l!t"i -~
Number of acres in lease:
'Rotary or cable tools '
Approx. d/ite.wo'rk Will
Number of wells on lease, including this well.'
complet'ed in or drilling to this reservoir:
If lease, purchased wi:th one or more -
wells drilled, from .Whom purchased:
:Name Address
Status of bond
Remarks: (If this'~s-'an application to deepen, or plug back, briefly'describe work to be done, giving present
producing zone and'expe:cted new producing zone) ,
CERTIFICATE: I, the undersigned, state that I am th! ' ' the~ ~1~. '~?: ~
(company), and that I am authorized by said company to make this report; and that this report was pre-
pared under my supervision and direction and that the facts stated therein are true, correct and complete to
the best of my knowledge.. Original Signe~
/~ .- /-. .- ,.
Permit Number: . ~'-"'. -: /./ .... - i: '
Approval Da e: _--~- y_/ _ ' j / ?-' · .. -
~~ /~/~~ I ' Application to Dr/Il, Deepen or Ping Back
ApProved By: ,Ix'- ~b' ' V ~'"e"*~'e~- ~ ~ ~ ~~~
Form No. P-1
Notice: Before sending in this form be sure that you have given .~ Authorized by Or~ler No. 1
aH information requested. Much unnecessary correspond- [ .
ence will thus be avoided. - ~ Effective October 1, 1958
See Instruction on Reverse Side of Form !
NOTICE OF
.
)R AGIDIZING .............. : .
OF ALTERING C/~ING...
NOTICE OF INTENTION TO
NOTICE OF INTENTION
·
~"oticE 0~' ,.~t,o.
·
·' ' . ' N&p~wne
' --Well No-.
. , -
The elevation
.
:HECK MARK :NATURE OF REPORT, NOTICE, Olql OTHER I~AT,~)
.- ' _ ..................... .a..u~z~...q.t....~.3 .... 19263
.
8W ' ' semrd B-& N
(State or ?errltory)
3- Insta.-Ll"ana test class ~I~ BOP,
4.
warranted.
· 5. Run 5½"' liner or
6J Co .replete
·
· .
! ulldar~tmr~d 'that till. plan
. 1'-' '8"
log and cement
· . drill to-+9000', log and cement' 9 5/8"
.
,000', log and core as
if warra-nted amd
and test results..
·
wrltlrq[ by. tho ~,~olO&4cli Survey I~fore oporitiom may be collrtm®qSc~.
:_ ~cui~_ _ca]._-Lfo~a* ... We.~.~_~~,.. I nc ............
.
.
PRODUCING DEPARTMENT
TELEPHONE B,R. 7~620!
C. V. CHATTERTON
DISTRICT SUPERINTENDENT
P. O. BOX 7-839 · ANCHORAGE · ALAS~'~:,. ,: .... ;~,~,/
OriE, inal Si~ne~
C. V. CHATTERT.,O:~
'D. jUN~A~
AUG "6 1°~65
4] ' ii
I
+
i
t
I
I
I
~ 26
24
18
- ~
/!
:30
25
20 ' 21
I0
ATIO
I
z9 I z8
I
I
I
i
I
I
I
!
STANDARD OIL COMPANY OF
~'~ ' WESTERN OPERATIONS, INC.
'~ (OPERATOR)