HomeMy WebLinkAbout200-095 Imag~roject.Well History File Cover ~e
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
~_~'~- (:~ ~_ Well History File Identifier
RESC~AN DIGITAL DATA' OVERSIZED (Scannable)
[] Color items: I Diskettes, No.~ [] Maps:
[] Grayscale items: [] Other, No/Type [] Other items scannable by
large scanner
[] Poor Quality Originals:
OVERSIZED (Non-Scannable)
[] Other:
[3 Logs of various kinds
NOTES:
[] Other
Project Proofing
BY; BEVERLY P, OBIN (~~HERYL MARIA WINDY
Scanning Preparation _~ x 30 = ~,/~.)
BY: BEVERLY ROBIN VI.~NCEN'r~ SNERYL MARIA WINDY
Production Scanning
Stage 1 PAGE COUNT FROM SCANNED FILE:
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ,/~ YES NO
BEVERLY ROBIN VINCENT SHERYL MARIA ~,,~ DATE:
ReScanned ~ind~vid~e~ page [.~pec~al at~e~r~t~] ~ca~nh~g ct)ropier, ed)
RESCANNEDBY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE:
I$1
General Notes or Comments about this file:
Quality Checked
12/10/02Rev3NOTScanned,wpd
• •
bP
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519-6612
December 21, 2010 1
ED JAN U1
Mr. Tom Maunder , AAN' t) j ;Ail
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue � � n i b:'~ stun
Anchorage, Alaska 99501 nctr- ij
Subject: Corrosion Inhibitor Treatments of GPB DS 11 a00-07A
Dear Mr. Maunder, 1 I s $ !°l.
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS
11 that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
1 •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
DS -11
Date: 12/21/10
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft na gal
11 -01A 1921120 50029206440100 NA Sealed NA NA 6/25/2010
11 -02 1811280 50029206490000 NA Sealed NA NA 6/25/2010
11 -03A 1911520 50029206660100 NA Sealed NA NA 6/25/2010
11 -04A 1940230 50029204800100 NA Sealed NA NA 6/25/2010
•
11 -05A 1961570 50029206700100 NA Sealed NA NA 6/25/2010
11 -06A 2042250 50029206740100 NA Sealed NA NA 6/25/2010
11 -07 1811770 50029206877000 NA Sealed NA NA 6/25/2010
11 -08 1842290 50029212450000 NA Sealed NA NA 6/27/2010
11 -09A 1961280 50029214020100 NA 25 NA 42.50 6/29/2010
11 -10 1851590 50029213940000 NA 5 NA 28.90 6/30/2010
11 -11 1851410 50029213820000 NA Sealed NA NA 6/27/2010
11 -12 1841950 50029212120000 NA Sealed NA NA 9/12/2010
11 -13A 1921100 50029212290100 NA Sealed NA NA 9/12/2010
11 -16 1860780 50029215817000 NA Sealed NA NA 6/27/2010
11 -17A 2020320 50029215980100 NA Sealed _ NA NA 6/27/2010
11 -18 1861120 50029216070000 NA Sealed NA NA 6/27/2010
11 -22A 1950870 50029220356000 NA 1 _ NA 9.35 7/1/2010
11 -23A 1940810 50029216100100 NA Sealed NA NA 7/1/2010
11 -24A 1932040 50029216230100 NA Sealed NA NA 6/26/2010
11 -25A 1990820 50029204880200 NA Sealed NA NA 6/26/2010
11 -26 1861340 50029216280000 NA 1.9 NA 5.10 6/28/2010
11 -27 1861480 50029216380000 NA 3.5 NA 11.90 6/28/2010
11 -28A 2000950 50029219580100 NA Sealed NA NA 6/28/2010
11 -29 1940250 50029224660000 NA 0.2 NA 1.70 6/28/2010
11 -31A 1961830 50029225090100 NA 1.4 NA 6.80 6/28/2010
11 -32 1941310 50029225120000 NA 6.7 NA 59.50 6/30/2010
11 -33 1940900 50029224900000 NA 0.5 NA 2.55 6/30/2010
11 -34 1941380 50029225160000 NA 0.5 NA 3.40 11/27/2009
11 -35 1940650 50029224760000 NA 0.6 NA 5.10 6/30/2010
11 -37 1961740 50029227160000 NA 4 NA 42.50 7/1/2010
11 -38A 1982160 50029227230100 NA 2.1 NA 22.10 6/28/2010
II
Schh~nherger
Alaska Data & Consulting Services
2525 Gambell Street, Suke 400
Anchorage, AK 99503-2838
ATTN: Beth
Well Job 8
Log Description
NO.5580
Company: State of Alaska
Alaska Oi16 Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 98501
Date BL Color CD
1-27/P-20
01-01C
11-28A
05-25C AVKP-00085
BB6M-00016
AVKP-00081
BCUE-00021 RST -
RST
RST
MCNL 06/06/10
06/09/10
05/31/10
06/02/10 1
1
1
1 1
1
1
1
Y-01 B
14-07
MPS-37
15-27A
YS-27APB1 BAUJ-00024
BBKA-00035
BCRC-00026
10AKA0067
10AKA0067 MCNL
RST
RST ' ~
OH MWD/LWD EDR -
OH MWD/LWD EDR 05/25/10
06/06/10
06/21/10
05!14/10
05/08/10 1
1
1
2
2 1
1
1
1
1
PLEASE ACKN(1WI. Fnr:F arc FtoT wv crr_uru r_ wun ect„suwn ...,~ ............... ~...
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2.1
900 E. Benson Blvd.
os/osno
Alaska Data 8 Consulting Services
2525 Gambell Street, Sude 400
Anchorage, AK 99503.2838
aoa-o9s
4--a~A
•
,, 11
u
` ~ ~ ,
~~. ~M±;~s c aA 1 ~. _~.._
f°,~.:~I,3 a ~ 7~~1J
STATE OF ALASKA f,fL J!J/é/6
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
o Abandon
o Alter Casing
o Change Approved Program
2. Operator Name:
BP Exploration (Alaska) Inc.
ress:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
8. Property Designation:
ADL 028321
11. Present well condition summary
Total depth: measured
Effective depth:
true vertical
measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Linér
Length
113'
4327'
5272'
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
o Suspend
181 Repair Well
181 Pull Tubing
56.28'
12455
8904
12368
8836
6498'
1044'
o Operation Shutdown
o Plug Perforations
o Perforate New Pool
o Perforate
o Stimulate
o Waiver
o Other
o Re-Enter Suspended Well
o Time Extension
4. Current Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
umber:
99519-6612
200-095
6. API Number:
50-029-21958-01-00
9. Well Name and Number:
PBU 11·28A
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
feet
feet Plugs (measured) 11403
feet Junk (measured) None
feet
Size MD TVD Burst Collapse
20" 113' 113' 1490 470
13-3/8" 4327' 3506' 3450 1950
9-5/8" 5272' 4100' 6870 4760
7" 5096' - 11594' 3989' - 8278' 8160 7020
4-1/2" 11410'-12454' 8151' - 8903' 8430 7500
12288' - 12344'
8776' - 8818'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth):
3-1/2", 9.2# &
3-1/2", 9.3#
7" x 4-1/2" Baker 'S-3' packer;
7" x 4-1/2" Baker 'S-3' packer
13Cr &
L-80
11339' &
11341' - 11414'
11370'
11239'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
RSDMS 8Ft. MAYO 8 2006
13.
Prior to well operation:
Subsequent to operation:
14. Attachments:
Oil-Bbl
Re resentative Dail Avera e Production or In·ection Data
Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
15. Well Class after proposed work:
o Exploratory 181 Development 0 Service
16. Well Status after proposed work:
181 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL
est 0 my nowledge. Sundry Number or N/A if C.O. Exempt
N/A
o Copies of Logs and Surveys run
181 Daily Report of Well Operations
181 Well Schematic Diagram
Printed Name Terrie Hubble
Title Technical Assistant
Signature
Form 10-404 Revised 04/2004
Prepared By Name/Number:
Terrie Hubble, 564-4628
Submit Original Only
Phone
Date D5/03/~
564-4628
Well:
Field:
API:
Perm it:
11-28A Rig Workover
Prudhoe Bay Unit
50-029-21958-01-00
200-095
Accept:
Spud:
Release:
Rig:
03/30/06
N/A
04/15/06
Nabors 3S
03/20/06
SET 3.5" HALIBURTON FASDRILL PLUG AT 11403. PLUG HELD 3500 PSI CMIT FOR 0.5 HRS.
PRE-RIG WORK
03/21/06
CUT THE 3.5" TUBING AT 11341'.
03/25/06
TII/O= 300/240/150. PRE RWO CIRC OUT. PUMPED 927 BBLS OF 1% KCL DOWN THE TUBING TAKING
RETURNS UP THE IA AND DOWN THE FLOWLINE. PUMPED 156 BBLS OF DIESEL DOWN THE IA. U-
TUBED TO FREEZE PROTECT TXIA. FREEZE PROTECTED THE FLOWLINE. BLED ALL PRESSURES BACK.
ATTEMPTED TO MIT-OA, NOT ENOUGH RIG UP CLEARANCE FROM FLOOR FRAMING. FINAL WHP= 0/0/0.
BP EXPLORATION Page 1 of 9
Operations Summary Repol't
.
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description. of Operations
3/29/2006 13:00 - 19:00 6.00 MOB P PRE Pre-Rig move pad inspection with DSO and get Unit Work
Permit signed. Exhange contact and Emergency information
numbers. MIRU Camp, Shop, and Generator module. Spot
new wellhead equipment behind well 11-28A. Peak trucks
return to W-15 to bring rig carrier, pipe shed and pit modules.
19:00 - 00:00 5.00 MOB P PRE Move rig carrier, pipe shed and pit modules to 11-28A from
W-15.
3/30/2006 00:00 - 04:00 4.00 MOB P PRE Rig on pad at 0400 hrs.
04:00 - 06:00 2.00 RIGU P PRE PJSM. Spot rig over well. Set rig mats and herculite pit liner.
Pre-tour HSE meeting with day crew at 0530 hrs. Reviewed
short scope for RWO and days plan forward.
06:00 - 13:00 7.00 RIGU P PRE Spot and hook up Pipe Shed, Pit Module, start up rig systems,
and raise the Derrick. RU flowback tank. Continue to get rig
operational.
13:00 - 16:00 3.00 RIGU P PRE Telescope the Derrick, continue hooking up and testing rig
systems. Flowback tank rigged up and hardline pressure
tested. 290 Bbls 120F seawater on location load pits.
16:00 - 18:00 2.00 RIGU P PRE Rig Accepted. RU to pull BPV. Install fuseaable cap on SSV
and bleed hydraulic fluid from chamber until stem touchs cap.
MU double valve on annulus and rig up kill line. PU lubricator.
Pull BPV. LID lubricator. WHPS T IIA lOA = 0 I 0 I 0 psi. Rig
up kill line to pump in sub in top of tree.
18:00 - 21:30 3.50 KILL P DECOMP Rig up and PIT lines to circulate out diesel freeze protect to
blowdown tank.
21 :30 - 22:30 1.00 KILL P DECOMP PJSM. Reverse circulate 30 bbls. @ 3.0 BPM @ 390 psi down
IA to clear tubing of diesel freeze protect. Swap circulating
lines to circulate long way.
22:30 - 23:30 1.00 KILL P DECOMP Circulate 200 bbls. long way @ 4.0 BPM @ 410 psi to clear IA
of diesel freeze protect. OAP = 80 psi.
23:30 - 00:00 0.50 KILL P DECOMP Rig down circulating lines and blow down same with air to
ensure clear of fluid. Veco vac truck vaccing out blowdown
tank to ensure empty. T/I/O - 010/80.
3/31/2006 00:00 - 02:00 2.00 WHSUR P DECOMP Set and test TWC to 1000 psi.
02:00 - 04:30 2.50 WHSUR P DECOMP N/D production tree. Screw in landing jt. XO to verify tubing
hanger lift thread integrity prior to N/U BOPE.
04:30 - 06:00 1.50 BOPSUF P DECOMP N/U DSA and BOPE. Notify AOGCC up pending BOPE
testing. Witness of testing waived by Chuck Scheve.
06:00 - 11 :00 5.00 BOPSUF P DECOMP Continue NU BOPE. Leak Incident - Motorman changing fuel
filter on one of main rig engines in Carrier. He closed valve on
fuel line to isolate filter, and removed it. With filter off, valve
failed and leaked diesel on floor of Carrier, approx. 1 gal
seeped through floor to Herculite liner below. Spill dikes
quickly put in place, leak cleaned up and reported, LCIR
entered in Traction.
11 :00 - 00:00 13.00 BOPSUF P DECOMP NU BOPE
4/1/2006 00:00 - 02:00 2.00 BOPSUF P DECOMP NU BOPE.
02:00 - 06:00 4.00 BOPSUF P DECOMP PJSM. PIT BOPE per AOGCC regulations. 250 Lo I 3500 Hi.
State witness of test waived by Chuck Scheve.
06:00 - 08:00 2.00 BOPSUF P DECOMP Break out and lay down test joint, dart, subs etc. PUMU
lubricator extension and DSM lubricator. Check Tbtg and IA
pressures 0 I 0 psi. Pull TWC. LID lubricator and lubricator
extensions.
08:00 - 10:30 2.50 PULL P DECOMP PJSM. PUMU landing joint with XO's to Tbg Hgr and head pin.
Printed: 4/17/2006 11:05:13AM
BP EXPLORATION Page2of9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/112006 08:00 - 10:30 2.50 PULL P DECOMP Torque all connections. Screw landing joint into top of hanger
and pull to surface. 66K PU weight with no overpull. Break out
and lay down Tbg Hgr and landing joint.
10:30 - 17:30 7.00 PULL P DECOMP POH laying down 3 1/2" 9.3# L-80 tubing. Keeping hole full
with 8.5#/gal seawater. 150 jts. OOH at 1730 hrs.
17:30 - 20:30 3.00 PULL P DECOMP 200 jts. OOH at 2030 hrs. 0 bbls. fluid losses.
20:30 - 00:00 3.50 PULL P DECOMP 280 jts. OOH. Continuous hole fill to pipe displacement.
Numerous holes in tubing. Corrosion holes appear to be from
inside out. Using rotary slips to increase surface area for slips
to contact pipe and prevent pipe collapsing.
4/2/2006 00:00 - 01 :30 1.50 PULL P DECOMP 280 jts. OOH
01 :30 - 03:00 1.50 PULL N RREP DECOMP Pipe skate hydraulic problem. Repair same. Skate BOL @
0300 hrs.
03:00 - 08:30 5.50 PULL P DECOMP Finish POH wlcompletion string. Recovered 358 Jts, 4 GLM's,
1 X nipple wI subs. C&C rig floor. Tbg joint with jet cut
dimensions = 16.63' length I 4" OD of flare. PUMU FMC Wear
Ring and RIH.
08:30 - 11 :30 3.00 CLEAN P DECOMP PJSM. PUMU Baker fishing BHA #1. 6" x 31/2" Dress off
shoe wI extensions, Inner Dressing Mill, WP Boot Basket wI
DO Mill, 2 ea Boot Baskets, 7" Csg Scraper, Bumper Sub, Oil
Jars. RIH on 6 ea 4 3/4" DC. OAL - 232.01'
11:30-15:15 3.75 CLEAN P DECOMP RIH wI fishing BHA, picking up 3 1/2" DP. Stop running DP
due to problems with hydraulics on Skate.
15:15-17:30 2.25 CLEAN N RREP DECOMP Repair Skate.
17:30 - 18:00 0.50 CLEAN N DECOMP Continue to RIH picking up 3 1/2" DP
18:00 - 20:00 2.00 CLEAN N RREP DECOMP Repair pipe skate.
20:00 - 00:00 4.00 CLEAN P DECOMP Resume RIH w/DP. Found jt. # 56 to be bent. replaced same
in string and tally with jt. of same length.
4/3/2006 00:00 - 01 :00 1.00 CLEAN P DECOMP Entered 7" liner top at 5096' with 154th jt. DP. Noted slight
bobble on weight indicator as mill shoe entered liner. No
indication of entrance of scraper into liner top. Continue RIH
w/DP.
01 :00 - 02:15 1.25 CLEAN P DECOMP RIH w/DP picking, up singles.
02:15 - 02:45 0.50 CLEAN N RREP DECOMP Repairing broken jerkline on rotary make-up tongs.
02:45 - 10:00 7.25 CLEAN P DECOMP Resume RIH w/DP, picking up singles.
10:00 - 11 :00 1.00 CLEAN P DECOMP Tight spot in Csg at 10,446'; work scraper and clean up. Tight
spot in Csg at 10,512'; work scraper and clean up. RIH picking
up DP
11:00 -17:00 6.00 CLEAN P DECOMP 340 Joints of DP out of 351 total joints required in hole. PJSM
to discuss procedures and safety issues pertaining to PUMU
Kelly. PUMU Kelly.
17:00 - 17:15 0.25 CLEAN P DECOMP Tag top of tubing stub on jt. 351 @ 11332'. LID jt #351. P/U
10' DP pup. PUMU kelly. Wait on BFT serviceman to arrive.
17:15 - 18:15 1.00 CLEAN P DECOMP PJSM. Commence rotating @ 60 - 80 RPM I 7000-8000 ftIlbs
torque, (free spin). Bring on pump to 3 1/2-4.0 bpm @ 570 psi.
Pump 20 bbls. hi-vis sweep and switch to seawater. RIH wI
kelly and tag top of stub at 11332'. Mill off top of stub wI
1000-2000# WOM. RIH wI kelly to 11345' w I maximum torque
noted at 9000 ftIlbs. Pull mill up clear of top of stub and work
back down over stub 3 times wlo rotating.
18:15 - 21:15 3.00 CLEAN P DECOMP Shut down pump and lay down kelly and 10' DP pup. PU 1 jt.
DP. Prepare to reverse circulate hole clean.
21 :15 - 00:00 2.75 CLEAN P DECOMP Tag top of stub @ 11332'. Pick up 1 ft. off stub. Pump 10
Printed: 4/17/2006 11:05:13AM
BP EXPLORATION Page 3 of 9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/312006 21:15-00:00 2.75 CLEAN P DECOMP bbls. hi-vis sweep and switch to seawater. Reverse circulating
pump rate = 4.0 bpm at 700 psi. Reciprocating DP every 15
minutes.
4/4/2006 00:00 - 01 :00 1.00 CLEAN P DECOMP Reverse circulating pump rate = 4.0 bpm at 700 psi.
Reciprocating DP every 15 minutes. Pump pressure
decreased to 500 psi after 20 bbl. sweep recovered to surface.
Circulated 100 bbls. over surface to surface volume.
Recovered small amount of mill cuttings on magnet in possum
belly and minimal amount of scale and unidentifiable solid
debris across shaker screen.
01 :00 - 03:00 2.00 WHSUR P DECOMP Rig down reverse circulating equipment. POH LID 6 jts. DP.
POH w/1 std. DP. PJSM. PUMU HES RTTS packer wlstorm
valve. Set packer -60 ft. below rotary table. PIT packer to
1000 psi. LID 2 jts. DP and packer retrieving head.
03:00 - 07:30 4.50 CLEAN P DECOMP Break down kelly and lay same down. Clear and clean rig floor
and prep to re-Ievel Rig.
07:30 - 16:00 8.50 CLEAN N HMAN DECOMP Scope down and lower Derrick. Level Rig Carrier. Raise and
scope up Derrick.
16:00 - 20:30 4.50 BOPSU¡:; P DECOMP NID BOP Stack and prepare to C/O 9-5/8" Packoffs and tubing
head adapter.
20:30 - 00:00 3.50 WHSUR P DECOMP PJSM. Attempt C/O 9/5/8" casing packoff elements. Cameron
service technician on location to direct work. Made attempt to
pull tubing spool with 2 tuggers and nylon straps. Broke one
nylon strap while pulling on adapter. Near Miss IR 1786699
generated in Traction to capture incident. Stopped job and
discussed different rigup with cable slings attached to rig
traveling blocks to allow measurement of tension pulled to
remove adapter flange. Rigged up rated cable slings and
shackles to lifting bails on traveling blocks and studs in tubing
spool. Applied 18,000 Ibs. pull on tubing spool and worked
cable sideways with tugger to get sideways movement. Tubing
spool came free after 30 minutes of working pulled tension up
and down.
4/5/2006 00:00 - 00:45 0.75 WHSUR P DECOMP Attempt to pull 9-5/8" packing. Casing packing retaining ring
not made to be readily pulled. 9-5/8" casing packoff tested
good to 3500 psi on 3/14/2006. Called workover engineer and
discussed plan forward. Decision made to leave 9-5/8" casing
packing in place and install new tubing spool along with tubing
spool upper packoff ring.
00:45 - 08:30 7.75 WHSUR P DECOMP Replace upper tubing spool packoff and tubing spool with new
equipment. Pressure test same. Test failed. Remove tubing
spool and troubleshoot problem. Cannot remove Upper Packoff
Assembly with Tugger Line. P/U 1-jt of DP and M/U to XO and
to Packoff Running Tool. Check level of the Wellhead Spool
and find that it is truly horizontal. M/U Packoff Running Tool to
Upper Packoff assembly and use 6K to pull Packoff free.
08:30 - 11 :30 3.00 WHSUR P DECOMP Clean Upper Packoff Assy, remove seals and dry-fit Upper
Packoff and new Spool. Everything OK. Pull off Spool, remove
Upper Packoff, replace seals and BX-160 Ring, re-install
Packoff and Spool and M/U studs wI Sweeney Wrench.
11 :30 - 12:30 1.00 WHSUR P DECOMP Test Upper Packoff to 3500 psi and hold for 15-minutes. Good
test. PIT 9-5/8" casing packoff to 3500 psi for 15 minutes.
Good test.
Printed: 4/17/2006 11:05:13AM
BP EXPLORATION Page 4of9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/512006 12:30 - 00:00 11.50 BOPSUF P DECOMP PJSM. N/U BOPE. 24 hr. notice to AOGCC - John Crisp of
impending weekly BOPE test sometime the evening of 4/6/06
or morning of 4/7/06.
4/6/2006 00:00 - 03:00 3.00 BOPSU¡:; P DECOMP Body PIT BOPE and chart same to 250 psi LO/3500 psi HI.
Encountered several leaks during testing process. Repaired
leaks and completed PIT.
03:00 - 05:00 2.00 CLEAN P DECOMP PJSM. P/U running tool and set wear ring. Wear ring I.D. =
9.25". PUMU HES RTTS packer retrieving tool and 2 jts.
3-1/2" DP with headpin in top jt. RIH w/DP and engage 9-5/8"
RTTS packer and open storm valve. Monitor parameters. 0
psi on DP. Close annular preventer. Release packer and
monitor annulus pressures. 0 psi on annulus. Open annular
preventer. POH w/DP and packer. LID DP and packer.
05:00 - 07:30 2.50 CLEAN P DECOMP PJSM. Rig up floor with DP handling equipment. POH w/DP
and BHA #1. LID DP 1x1. Crew changeout @ 0700; DP Jt #46
out of the hole.
07:30 - 08:00 0.50 CLEAN P DECOMP Changeout Pullback Line to Off-Driller side Rig Tong. New
Lines on Order.
08:00 - 20:30 12.50 CLEAN P DECOMP Resume POOH and LID DP through Pipe Shed. Jt #60 @
0820-hrs; #90 @ 0930-hrs; #200 @ 1415-hrs; #294 @
1800-hrs; jt. 300 @ 1845-hrs; 342 jts. @ 2015-hrs.; 351 jts. @
2030-hrs.
20:30 - 22:30 2.00 CLEAN P DECOMP POH LID drill collars and milling BHA. Crew changeout at
2200-hrs. Pre-tour HSE meeting wlnight crew.
22:30 - 23:30 1.00 CLEAN P DECOMP C&C rig floor.
23:30 - 00:00 0.50 RUNCO! If' RUNCMP Rig up floor and derrick to run completion.
4/7/2006 00:00 - 07:45 7.75 RUNCO! If' RUNCMP PJSM. PU and hang stabbing board in Derrick. Rig up
compensator to traveling block. Hang and test double stack
tubing tongs and set up for torque turn thread connections.
Load Pipe Shed with remaining joints of tubing and downhole
jewelry. Baker Completions making final checks of jewelry and
Nabors Casing making final checks of Torque-Turn equipment.
07:45 - 08:45 1.00 RUNCO! If' RUNCMP PJSM to RIH with new 3-1/2",9.2#, 13Cr80, Vam-Top
completion.
08:45 - 13:15 4.50 RUNCor If' RUNCMP P/U Mule Shoe assembly, RIH and M/U to XN-nipple assy. Use
Baker-Lok on all connections from bottom of Baker S-3, 7" x
4-1/2" Packer to the Mule Shoe assembly. Apply 2,900 Ib-ft
Optimum Torque and Jet-Lube Seal-Guard Pipe Dope to all
connections. Packer in hole @ 0930-hours. Joint #55 in hole @
1315-hrs.
13:15 - 14:00 0.75 RUNCor If' RUNCMP Daylight Tour Crew hitch changeout; conduct Pre-tour Safety
Meeting for the new Daylight Tour crew.
14:00 - 21 :30 7.50 RUNCO! If' RUNCMP Resume RIH wI new completion; joint #105 @ 1715-hrs.; jt.
#125 @ 2130-hrs.
21 :30 - 22:00 0.50 RUNCO! If' RUNCMP Pre-tour HSE meeting with night crew.
22:00 - 00:00 2.00 RUNCO If' RUNCMP Continuing operations running completion string in hole picking
up tubing 1x1 from pipe shed. Jt. #205 IH at OOOO-hrs.
4/8/2006 00:00 - 05:30 5.50 RUNCO If' RUNCMP Continue RIH wI 3-1/2" 9.3# 13Cr80 Vam Top tubing
completion string. Jt. #260 IH @ 0400-hrs.; jt. #280 IH @
0500-hrs.
05:30 - 06:00 0.50 RUNCO If' RUNCMP Scheduled crew changeout. Pre-tour HSE meeting with day
crew.
06:00 - 09:30 3.50 RUNCO fP RUNCMP Continue RIH wI 3-1/2" 9.3# 13Cr80 Vam Top tubing
Printed: 4/17/2006 11:05:13AM
BP EXPLORATION Page 50f 9
Operations. Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
.
4/8/2006 06:00 - 09:30 3.50 RUNCor fP RUNCMP completion string. Joint #300 IH @ 0700-hrs; #325 @
0830-hrs. Saw a slight bobble when joint #329 was RIH. The
packer depth in the completion string while #329 is being RIH
corresponds with a tight spot @ -10,512' encountered when
the cleanout BHA was RIH. When joint #340 was RIH the string
stacked out and we stopped RIH with -10K taken. Decide to
SID operations and confer with Baker completions and BP
RWO Engineer.
09:30 - 11 :00 1.50 RUNCO! VN RUNCMP Confer with Baker and BP RWO engineer. Decide to P/U to
find neutral position and move pipe uphole wI 58K. B/O and
LID joint #340, RIU to Reverse Circulate for 2-Tubing Volumes,
188-Bbls.
11:00 - 13:00 2.00 RUNCor ~ RUNCMP Reverse Circulate two tubing volumes. Find -1-gallon of scale
and sludge in the Possum Belly of the Shakers.
13:00 - 16:30 3.50 RUNCO! ~ RUNCMP R/U to POOH and LID 3-1/2", Vam-Top using Compensator
and Single-Joint Elevators. Could not pull Jt #337 above the
Rig floor while POH and pulled up to 140K. Packer Slips may
be hanging up in a Casing joint. Confer with RWO Engineer.
Decide to build Hi-Vis sweep and circulate around the long way
followed by MI Safe-Lube "slick-pill". Slack off to 47K and string
is free to RIH. Set slips with top of joint in good position for
stabbing Floor valve.
16:30 - 18:00 1.50 RUNCOr ~ RUNCMP Build 30-Bbls Hi-Vis sweep. Hold Pre-tour Safety Meeting for
Night Crew and prepare to circulate Sweep.
18:00 - 22:00 4.00 RUNCOr ~ RUNCMP Pump 30 bbl. Hi-Vis sweep surface to surface. None other
than pipe dope recovered in sweep returns across shaker
screen. Mix 30 bbl. slick pill w/20 gals. of MI Safe-Lube. Pump
Hi-Vis sweep long way @ 3.0 BPM @ 270 psi.
21 :30 - 00:00 2.50 RUNCOr VN RUNCMP Pump 30 bbl. slick pill of MI Safe-Lube followed by 95 bbls.
seawater @ 3.0 BPM @ 270 psi. to spot slick pill across
packer.
4/9/2006 00:00 - 00:30 0.50 RUNCOr ~ RUNCMP Continue pumping MI Safe-Lube slick pill to spot across
packer.
00:30 - 09:30 9.00 PULL N DECOMP POH LID 3-1/2" completion tubing. PU wt. = 87K#. Tight spot
at 16' OOH on jt. #336. Pulled 25K# over P/U wt. and string
came free. Continue POH with excess drag above P/U wt.
Overpulling 5-25K# in tight spots from jt. #330 to jt. #325. Jt.
#320 OOH at 0245-hrs. No drag above P/U wt. from jt. #325 to
jt. #320 OOH. 36 jts. laid down @ 0400 hrs.; 50 jts. LID at
0500-hrs. 64 jts. LID @ 0600-hrs. 98 jts LID @ 0930-hrs.
09:30 - 10:00 0.50 PULL N DECOMP Call Nabors Casing for new Torque Turn Power Tong dies and
replace same.
10:00 - 00:00 14.00 PULL N DECOMP Continue POH LID 3-1/2" completion tubing. 129 jts LID @
1100-hrs.196jts LID @ 1410-hrs.; 130jts remaining to be LID
@ 1700-hrs.; 291 jts. laid down at 2130-hrs. 45 jts. remaining
to be laid down. Called AOGCC at 2130-hrs. for notice of
testing BOPE when completion string and jewelry laid down.
John Crisp waived witnessing of test.
4/10/2006 00:00 - 00:30 0.50 PULL N DECOMP POH LID 7" Baker S-3 packer and jewelry below packer.
Broke all Baker-Lok'd connections with hydraulic tongs.
Packer has several small gouges approx. 1/16" to 1/8" deep in
lower cone and gauge ring. Overshot muleshoe has two
gouges side by side approx. 1/4" wide by 1/4" deep by 3" long
Printed: 4/17/2006 11:05:13AM
BP EXPLORATION Page 6 of9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/10/2006 00:00 - 00:30 0.50 PULL N DECOMP on top of shoulder of muleshoe.
00:30 - 02:00 1.50 PULL N DECOMP Clear and clean rig floor and prep to pick up BHA #2 and 3-1/2"
DP. Note: Fresh water leak occurred in rig carrier area. A
"leak" LCIR 1793760 submitted and proper notifications made.
02:00 - 05:00 3.00 BOPSUF N DECOMP Prep to perform weekly BOPE test.
05:00 - 11 :30 6.50 BOPSUF N DECOMP Test BOPE per AOGCC and BP specs. 250 psi LO/3500 psi
HI.
11:30 - 12:30 1.00 BOPSUF N DECOMP RID test lines and equipment and prepare to P/U and M/U BHA
to cleanout tite spots found during completion run. Confer with
RWO engineer and decide to use the Dress-off Mill on the
bottom of the BHA to ensure that we can still get over tubing
stub @ 11,332'.
12:30 - 16:00 3.50 CLEAN N DECOMP P/U M/U Mill-out I Dress-off BHA: 6"x3-1/2" Dress-off Mill
Shoe; 2-ea Wash Pipe Extensions; Wash over Junk Sub;
6.049" Watermellon Mill; 2-ea Boot Baskets; Bumper Sub; Oil
Jar; Pump-Out Sub; 6-ea Drill Collars. Install new Pull-Back
Line for Make-Up Rig Tongs.
16:00 - 17:30 1.50 CLEAN N DECOMP Finish P/U drill collars. RIH Mill-out I Dress-off BHA on DP
from Pipe Shed. Pre-tour HSE meeting with night crew.
17:30 - 00:00 6.50 CLEAN N DECOMP RIH w/BHA #2 and DP 1 x1 through pipe shed. Running a
single row of DP, loading pipe shed with next row, strapping
same, running DP and repeat. Can only load one row of DP in
pipe shed at a time due to completion string left in pipe shed to
protect it's integrity. 10 jts. DP RIH @ 1820-hrs.; 55 jts. DP
RIH @ 2000-hrs.;
4/11/2006 00:00 - 06:00 6.00 CLEAN N DECOMP RIH wI BHA #2 on 3-1/2" DP 1x1 through pipe shed. Jt. #170
RIH @ 0100-hrs.; Jt. 262 RIH @ 0400-hrs; Jt. #300 @
0600-hrs.
06:00 - 07:00 1.00 CLEAN N DECOMP Finish loading and tally the last layer of Drill Pipe in the Pipe
Shed.
07:00 - 08:30 1.50 CLEAN N DECOMP Continue RIH, found first tight spot @ 10,414', 15' in on jt #322;
took 7K running in and -8K out. Worked thru 6-times and
weight differentials didn't change. Call RWO Engineer and
decide to Kelly-up for rotary reaming thru the tight spot.
08:30 - 09:00 0.50 CLEAN N DECOMP PJSM to discuss all aspects of bringing Kelly on-board thru the
Pipe Shed, Rigging Up Rat Hole, Kelly, and associated
equipment.
09:00 - 14:00 5.00 CLEAN N DECOMP Clear and Clean Rig floor; bring Kelly Bushing to Rig Floor;
M/U Swivel to Kelly; M/U Kelly to TIW and to DP. Change out
Rig Tongs to torque up Kelly connections. H/U Circulating Line.
14:00 - 14:45 0.75 CLEAN N DECOMP Slowly lower Kelly and find the tight spot @ 10,414' and drop
through it, P/U and establish circulation @ 2.5-BPM, begin
rotating @ 45 to 50 RPM and slowly work down through tight
spot, see torque build to 4,000 Ib-ft. Work on down for full Kelly
and pick back up. Repeat the reciprocating cleanout 4-times.
Stop rotating and SID pump and slowly lower down through the
tight spots and see no weight fall-off or drag when POH.
14:45 - 15:30 0.75 CLEAN N DECOMP RIU to Reverse Circulate, then Reverse Circ one DP volume
back to Shakers. Get back Pipe Dope Slime with fine metal
shavings.
15:30 - 16:30 1.00 CLEAN N DECOMP Break-off Kelly and set back in Shuck. P/U Bails and DP
Elevators.
Printed: 4/17/2006 11 :05:13 AM
·
BP EXPLORATION Page? of9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/11/2006 16:30 - 17:00 0.50 CLEAN N DECOMP P/U joint #322 and RIH slowly; don't see any tight spots. P/U
joint #323 and RIH slowly, find two tight spots while lowering
full joint. Repeat 4-times, but tight spots remain @ -10,455'
and 10,465'.
17:00 - 18:15 1.25 CLEAN N DECOMP LID joint #323 and RIU to P/U Kelly. Performed reciprocating
cleanout from 10,450' to 10,484' while circulating at 2.5 BPM.
Stop rotating and SID pump and slowly lower down through the
tight spots and see no weight fall-off or drag when POH.
18:15 - 19:00 0.75 CLEAN N DECOMP RIU to Reverse Circulate, then Reverse Circ one DP volume
back to Shakers. Got back Pipe Dope Slime.
19:00 - 20:00 1.00 CLEAN N DECOMP Break-off Kelly and set back in Shuck. P/U Bails and DP
Elevators.
20:00 - 21 :00 1.00 CLEAN N DECOMP P/U joint #323 and RIH slowly; don't see any tight spots. P/U
joint #324 and RIH slowly, don't see any tight spots. RIH with
joint #325 find a tight spot while lowering full joint. Repeat
4-times, but tight spots remain @ -10,525'.
21 :00 - 22:30 1.50 CLEAN N DECOMP LID joint #324 and #325 and RIU to P/U Kelly. Performed
reciprocating cleanout from -10,525' to -10,533' while
circulating at 2.5 BPM. Stop rotating and SID pump and slowly
lower down through the tight spots and see no weight fall-off or
drag when POH.
22:30 - 23:00 0.50 CLEAN N DECOMP RIU to Reverse Circulate, then Reverse Circ one DP volume
back to Shakers. Got back Pipe Dope Slime.
23:00 - 23:30 0.50 CLEAN N DECOMP Break-off Kelly and set back in Shuck. P/U Bails and DP
Elevators.
23:30 - 00:00 0.50 CLEAN N DECOMP P/U joints #324 - #351 and RIH slowly to Tubing Stub. Don't
see any more tight spots. Tagged Stub @ -11,335'.
4/12/2006 00:00 - 01 :00 1.00 CLEAN N DECOMP P/U joints #324 - #351 and RIH slowly to Tubing Stub. Don't
see any more tight spots. Tagged Stub @ -11,335'. POH - 10'
to 11,325' in order to perform circulation.
01 :00 - 02:00 1.00 CLEAN N DECOMP Reverse Circulated 100 Bbls down the IA and took returns up
the Drill Pipe.
02:00 - 07:00 5.00 CLEAN N DECOMP Circulated 30 Bbls Hi-Vis sweep followed by 570 Bbls of
Seawater down Drill Pipe and out the IA. Recovered about a
gallon of Pipe Dope and scale slime, same as yesterday.
Returning fluid eventually cleaned up to a light tea-colored fluid
which will be changed out upon completion of the well.
07:00 - 14:30 7.50 CLEAN N DECOMP POH and LID DP through Pipe Shed. Joint #100 out @
1030-hrs; 150 @ 1300-hrs; 202 @ 1430-hrs. Stop POOH 3-jts
above the 7" Liner top to pressure test casing.
14:30 - 15:30 1.00 CLEAN N DECOMP R/U to test casing.
15:30 - 16:00 0.50 CLEAN N DECOMP Pressure test Casing to 3,500 psi and hold for 30-minutes.
Rock solid test.
16:00 - 17:00 1.00 CLEAN N DECOMP P/U Kelly, M/U to string to use string weight to help break Kelly
connections. Break off Kelly and set back in Shuck.
17:00 - 00:00 7.00 CLEAN N DECOMP Continue to POH and LID DP through Shed. Break out and lay
down Baker fishing BHA #2.
4/13/2006 00:00 - 02:00 2.00 CLEAN N DECOMP Break out and lay down Baker fishing BHA #2.
02:00 - 05:00 3.00 CLEAN N DECOMP P/U Kelly out of Shuck and LID in Pipe Shed in order to clear
Rig floor. Move Kelly outside to Pipe Rack. Clear Rig Floor of
allXO's.
05:00 - 06:00 1.00 RUNCO ,f\ RUNCMP RIU Windwalls on Stabbing Board, RIU and test Torque Turn
Equipment.
Printed: 4/17/2006 11:05:13AM
BP EXPLORATION Page 80f 9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 35 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/13/2006 06:00 - 00:00 18.00 RUNcm fP RUNCMP RIH wI new 3-1/2", 9.2#, 13Cr-80, Vam Top Tubing. Clean and
inspect all Vam-Top pins. Re-apply Jet-Lube Seal-Guard pipe
dope and Torque Turn all Vam-Top connections to 2,900 Ib-ft;
and the TCII connections below the Baker S3 Packer to 2,300
Ib-ft. Baker-Lok all connections below the Baker S-3 Packer.
Vam-Top jt #46 @ 1350-hrs; #102 @ 1700-hrs; #150 @ 2000
hrs; #170 @ 2100 hrs; #220 @ 2330 hrs
4/14/2006 00:00 - 10:30 10.50 RUNCO! fP RUNCMP RIH wI new 3-1/2",9.2#, 13Cr-80, Vam Top Tubing. Clean and
inspect all Vam-Top pins. Re-apply Jet-Lube Seal-Guard pipe
dope and Torque Turn all Vam-Top connections to 2,900 Ib-ft;
and the TCII connections below the Baker S3 Packer to 2,300
Ib-ft. Baker-Lok all connections below the Baker S-3 Packer.
Vam-Top jt #230 @ 0000 hrs; #235 @ 0130 hrs; #246 @ 0300
hrs; #260 @ 0400 hrs; #335 @ 0930-hrs; #352 @ 1030. P/U wt
= 83K, S/O wt = 60K.
10:30 - 11 :00 0.50 RUNCO! fP RUNCMP P/U joint #353 and RIH; then RIH wI #354 and tag top of 7"
Liner @ 11331', which is 10' in on #354. Continue on in another
9' and watch weight drop off to 45K. P/U and RBIH again to
verify. Allow weight to decrease to 45K. Make Space-out
calculation; will need -15.10' of pup joints below joint #352 to
space-out 2' above the stub, which equates to 7' of swallow.
11 :00 - 11 :30 0.50 RUNCOr ~ RUNCMP RIU to Reverse Circulate to verify top of stub.
11 :30 - 12:30 1.00 RUNCOI RUNCMP Close Hydril and break circulation; slowly lower completion and
see pressure increase from 40 psi to 200 psi, again indicating
the top of the 7" Liner @ 11,331'. Continue RIH to confirm
Space-out. Will use two pup joints, 9.80' and 5.86' for 15.66',
placed under the top full joint of 3-1/2" Vam-Top tubing.
12:30 - 13:15 0.75 RUNCOI tp RUNCMP Break-off and LID joints #354, #353, and #352. R/U for
Reverse Circulation and blow air through Tiger Tank Line to
verify open, checking for leaks. Note: at no time did we see any
indication of the completion string dragging while RIH. This is a
clean wellbore.
13:15 - 14:30 1.25 RUNCm fP RUNCMP P/U two pup joints (9.80' and 5.86') and Torque up to
completion string. P/U full joint #352 and Torque up and RIH.
P/U Hanger and M/U to string. M/U 3-1/2" IF box x 4-1/2 TCII
pin XO to 3-1/2" IF Landing Joint and M/U to Hanger. Close
Hydril and prepare to reverse circulate.
14:30 - 19:30 5.00 RUNCm fP RUNCMP Reverse Circulate 100-Bbls of 1200 F seawater followed by 2 x
240-Bbls of 1200 F seawater, each mixed with 61-gallons of
Correxit EC1124A Corrosion Inhibitor. All circulation 3-BPM @
230-psi. Taking all returns to Tiger Tank.
19:30 - 20:00 0.50 RUNCm ~ RUNCMP Land the Tubing Hanger and run in Lock Down Screws.
20:00 - 00:00 4.00 RUNCm RUNCMP Drop Ball and Rod and set Packer. Increase pressure to 3,500
psi on Tubing. Saw Packer set at - 2,300 psi. 30 minute PIT to
3,500 psi on Tubing Passed. Bleed Tubing pressure to 1,500
psi. Increase IA pressure to 3,500 psi. 30 minute PIT to 3,500
psi on IA Passed. Bleed Tubing pressure to 0 psi and shear
DCR. Circulate to prove DCR sheared.
4/15/2006 00:00 - 00:30 0.50 RUNCO! fP RUNCMP Set TWC and PIT to 1,000 psi.
00:30 - 09:30 9.00 BOPSUF P RUNCMP NID BOPE.
09:30 - 11 :00 1.50 BOPSUF P RUNCMP N/U Adaptor Flange and Tree.
11:00 -12:00 1.00 BOPSUF P RUNCMP Fill Tree with Diesel, pressure test Tree and Adaptor Flange to
5,OOO-psi. Won't test. Leak is coming from the BX-160 ring.
Printed: 4/17/2006 11 :05:13 AM
BP EXPLORATION Page 9 of9
Operations Summary Repol't
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 6/29/1989
Event Name: WORKOVER Start: 3/24/2006 End: 4/15/2006
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/15/2006
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
4/15/2006 11 :00 - 12:00 1.00 BOPSUF P RUNCMP Try re-torqueing all nuts on the Upper Flange of the Adaptor
Spool. But still won't test. The leak is still coming from a small
area in the BX-160 ring joint.
12:00 - 14:00 2.00 BOPSUF P RUNCMP Drain diesel out of Tree void. Nipple down Tree to inspect BX
160 Ring and flange grooves. Emory cloth the grooves and
replace BX-160 Ring. Reinstall on Tubing Head.
14:00 - 15:00 1.00 BOPSUF P RUNCMP Fill Tree with diesel and test, but still lose pressure. Call DSM
to bring another TWC.
15:00 - 16:00 1.00 BOPSUF P RUNCMP P/U and install Lubricator; remove and replace TWC.
16:00 - 17:00 1.00 BOPSUF P RUNCMP Top off Tree with diesel and pressure test. Slow leak off, 50-psi
in 10-minutes. SII Manual Master Valve and test agin from the
top and pressure holds rock steady. Release pressure, open
Master Valve and pressure up to 5,1 OO-psi. Very slow
bleed-off; bump up pressure to 5,1 OO-psi, three times.
Pressure finally rock steady @ 5,1 OO-psi and recorded on
chart.
17:00 - 19:45 2.75 WHSUR P RUNCMP Pull TWC with Lubricator. RIU Lil Red to Freeze Protect the
well. FP with 150 Bbls of diesel.
19:45 - 20:00 0.25 WHSUR P RUNCMP Set BPV and test to 1000 psi. Secure Tree and Cellar.
20:00 - 00:00 4.00 RIGD P RUNCMP RDMO to 01-31. Rig release at 00:00
Printed: 4/17/2006 11:05:13AM
11-28 (PTD #2000950) Classified as Problem Well
) )
Subject: 11-28 (PTD #2000950) Classified as Problem Well
From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>
Date: Tue, 28 Jun 2005 13:28:10 -0800
To:· "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>, "Harris,
Marvin L (CONOCO)" <harrml@BP.com>, "GPB, FS2/COTU Area Mgr" <GPBFS2TL@BP.com>,
"GPB, FS2 DS Ops Leaœ' <GPBFS2DSOpsLead@BP.com>, IIRossberg, R Steven"
<RossbeRS@BP.com>, "NSU, ADW Well Operations Supervisor"
<NSUADWWellOperationsSupervisor@BP . coin>, . "GPB, Wells Opt Eng" '
<CJ.PBWellsOptEng@BP.com>, "AOGCC Jim.Regg(E-mail)..<jim_regg@admin.state.ak.us>.
"AOGCCWintonAubert (E;..mail)" <winton _aubert@adtriin.state.ak.us>, "NSU, AÐW WL&
Completion Supervisor" <NSUADWWL&CompletionSupervisor@BP.com>, "GPB, Ops Mgr"
<GPBOpsMgr@BP.com>
CC: "Holt, RyanP (VECO)" <Ryan.Holt@BP.com>, "Reeves, Donald F" <ReevesDf@BP.com>
All,
Well 11-28 (PTD #2000950) has sustained casing pressure on the IA and is classified as a Problem
well. TIO's on 06/20/05 were 2200/2220NAC. The well failed a TIFL on 6/27/05.
The plan forward for this well is as follows:
1. DHD: TIFL - FAILED
2. SL: Run DGL Vs in sta #1 and #2
3. DHD: Re-TIFL
.1-01'(
Attached is a wellbore schematic. Please call with any questions.
«11-28A.pdf»
Rob Mielke
Well Integrity Engineer, BP Exploration, (Alaska) Inc.
Office: 1-907-659-5525
Pager: 1-907-659-5100 #1923
robert.mielke@bp.com
N'-~" 0 ')1 200~
SCAN· 1:.1..., .11 Ii t> I... ". ,
Content-Description: 11-28A.pdf
11-28A.pdf Content-Type: application/octet-stream
Content-Encoding: base64
~"E :> Silv...(.
t NU'(P
J ~-\-
z. --¿ '2.0 pS' ì
J
3 ¿~ 3 (ì~
7:CP L-. 4'~~~ ÂA.kjp J' ol'- ~€f
tô 4"', V-
ÙÄ
~ ,'tQ..
5Rt?fq 1l\q¡\ù';
1 of 1
7/13/2005 10:09 AM
PRUŒlOEBAY UNIT
IJ'ÆLL: 11-28A
ÆRMT f\b: 200-0950
API f\b: 50-029-21958-01
745' FSL & 291' FEL, Sec. 28, T11N, R15E
BP Exploration (Alaska)
REV BY COMVIENTS
CH'KAK CORRECllONS
REV BY COMWENTS
ORIGINAL COMJLErION
RiVO
RIG SIŒTRA CK
SIS-JH CONVffiTB:>TO CANVAS
SIS-MO
OC\ TE
10AJ2/89
05125/00
08126/00
10131/00
02/14/01
DATE
11/18/01
1 ÆllD l-i 12368' 1
9-5/8" CSG, 47#, L-80, 10 = 8.681" 1-1 11602' ~ ~
I 7"LNR,26#,L-80,ID=6.275"H 12470' ~
1 4-1/2" LNR, 12.6#, L-80, .0152 bpf, 10 = 3.958" l--i 12454' 1
! ,
\
z
r
z
ÆRFORA TION SUI'v1\/1ARY
REF LOG: SPERRY EWRIOOR 08/24/00
ANGLE AT TOP ÆRF: 42 @ 12288'
Note: Refer to Production DB for historical perf data
SIZE SPF INTffiVAL Opn/Sqz OC\lE
2-1/2" 6 12288 - 12302 0 09/30/00
2-1/2" 6 12320-12344 0 09/13/00
11370 1-1 7" X 4-1/2" BKR S-3 PKR, 10 = 3.875" 1
11395 l-i 3-1/2"HESXNNIP, 10=2.750" 1
11410 I-iTOPOF BKRTIEBACK SLV, 10= 5.25" 1
11417 1-i7" X4-1/2" BKRZXP A<R, 10= 4.375"
11424 1-17" X 5" BKR LNR HGR, D = 4.375"
11594 H 7" LNR, 29#, L-80, 10 = 6.184" 1
1 TOP OF CMT PLUG l-i 10600'
9-5/8" MILL OUT WINDOW
5272' - 5295' (OFF WI-IIPSTOCK)
1 3-/12" TBG, 9.3#, L-80, .0087 bpf, 10= 2.992"
~ GAS LIFT MANDRELS
ST MO lVO DEV TV PE VLV LATCH PORT OC\ lE
-.! 1 4706 3686 52 MM3-2 DOWE RK 16 08/29/00
2 7815 5689 47 MM3-2 SO RK 20 08/29/00
3 10026 7176 47 MM3-2 OV RK 0 08/26/00
4 11181 7936 49 MM3-2 OV RK 0 08/26/00
l J
~ ~ 5096 H 9-5/8" X 7" BKRZXP PKR,IO = 6.313" 1
5118 H 9-5/8" X 7" BKR HIVC HGR, 10 = 6.875" I
Minimum ID = 2.750" @ 11395'
3-1/2" HES XN NIPPLE
13-318" CSG, 72#, L-80, 10 = 12.347" 1-1 4326' ---.J
I 2218' 1-1 3-1/2" HES X NIP, 10 = 2.813" 1
11-28A
J
4-1/16" OW
OW
AXELSÖN
63.0'
.J\iA'.
ŠOÒ"
~3..~ 5~?~',
12393'
8800'
TREE =
WELL H !;A 0 =
"ACWÄ"TÖR;;;·...
KB. B.E.V =
SF. i3.. Bi ,;;.....
KOP";·
.~.~A.n.~ Ie.:: .........
Datum rill) =
Datum lVO =
SA FETY NOTES: 13-3/8" CSG SET ON
BVlffiGENCY SLIPS.
)
)
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
04/8/03
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
NO. 2742
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay, Endicott, Milne Pt.
Color
Well Job # Log Description Date Blueline Prints CD
~1~.~. 9-32 /%~- 1 t ~ 23051 RST-SIGMA 01113103
E)~S':9~_-29 I.~ ~ - ~ I~ 23022 RST-SIGMA 1~45102
~2-42A ~-I [~_~ 23018 MCNL 42129102
~S. 11-28A.~ -~ 2302~ RST-SlGMA ~13/02
~S. 15-~5B.~-~~ 23067 MCNL 01127103
,,
.......
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
-
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Received by:
Permit to Drill 2000950
DATA SUBMITTAL COMPLIANCE REPORT
9~9~2002
Well Name/No. PRUDHOE BAY UNIT 11-28A Operator BP EXPLORATION (ALASKA) INC
MD 12455 TVD 8904 Completion Dat 9/13/2000 Completion Statu 1-OIL Current Status 1-OIL
APl No. 50-029-21958-01-00
UIC N
REQUIRED INFORMATION
Mud Log N_go Sample No Directional Survey No
ED D
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/ Interval
Data Digital Digital Log Log Run OH / Dataset
Type Media Fmt Name Scale Media No Start Stop CH Received Number C~3mments
Ver LIS Verification '-/'~ 1 5274 12414 Open 6~5/2002 10849 /
1 5274 12414 Open
5261 12455 OH
5261 12455 OH
(data taken from Logs Portion of Master Well Data Maint)
Rpt Ver LIS Verification~ 6/5/2002
R R SRVY RPT-MWD ~ 9/8/2000
R R SRVY RPT + IFR ~ 9~8/2000
SPERRY 5261.73-12455.
SPERRY 5261.73-12455.
Well Cores/Samples Information:
Interval Dataset
Name Start Stop Sent Received Number Comments
ADDITIONAL INFORMATION
Well Cored? Y / ~
Chips Received? ~
Analysis --Y-FN-
R ~.r.~.iv~.d'~
Daily History Received? {~/N
Formation Tops ~.~N
Comments:
Compliance Reviewed By:
Date:
WELL LOG TRANSMITTAL
To: State of Alaska June 3, 2002
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7a Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs 11-28A, AK-MM-00131
1 LDWG formatted Disc with verification listing.
AP1//: 50-029-21958-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
1. Status of Well Classification of Service Well;
[] Oil [] Gas [] Suspended [] Abandoned [] Service ,~
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 200-095
3. Address 8. APl Number r ...............
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21958-01 ] ;:.::..-:;,~:
4. Location of well at surface 9. Unit or Lease NameI --~. ~~
744' NSL, 290' WEL, SEC. 28, T11 N, R15E, UM Prudhoe Bay Unit I ' ..... -;':~.-
At top of productive interval [!=~'? 0 ~ "":'~" '.~bl _
1066' NSL, 709' WEL, SEC. 20, T11N, R15E, UM 10. Well Number
At total depth
1142' NSL, 848' WEE, SEC. 20, T11N, R15E, UMA~ ~, r~,a~. ,-,,,,, ,-,,, ,...~.._ ,, .as,,a.,. ~.,.as,.,,,,,s.,...,mm,~,~
11-28A
A,,,~,-,-,,~,- 11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation'~h'a'~e'~ No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 56.28' ADL 028321
12. Date Spudded8/10/2000 113' Date T'D' Reached 114' Date c°mp'' Susp'' °r Aband'8/22/2000 9/13/2000 115' Water depth' if °ffsh°reN/A MSL ] 16. No. of CompletiOnSone
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
12455 8904 FTI 12368 8836 FT] [] Yes [] No] (Nipple) 2218' MDI 1900' (Approx.)
22. Type Electdc or Other Logs Run
MWD, GR, RES, MemoryGR, CCL
23. CASING, LINER AND CEMENTING RECORD
CA~ING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 113' 30" 2275 # Poleset
13-3/8" 68# K-55 / L-80 SuFace 4327' 17-1/2" 2500 sx AS III, 600 sx 'G', 150 sx AS II
9-5/8" 47# L-80 Surface 5272' 12-1/4" 500 sx SS II
7" 29# L-80 5096' 11594' 8-1/2" 395 sx Class 'G'
4-1/2" 12.6# L-80 11410' 12454' 6" 125 sx Class 'G'
124. Perforationsop. en to, Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and in[erva~, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
2-1/2" Gun Diameter, 6 spf 3-1/2", 9.3#, L-80 11414' 11370'
MD TVD MD TVD
12288' - 12302' 8776' - 8786'
12320' - 12344' 8800'- 8818' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 145 Bbls of Diesel
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
September 30, 2000 Flowing
Date of Test 'Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~ GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing 3asing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80
ORIGINAL
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered
Depth Depth and gravity, GOR, and time of each phase.
Shublik 'A' 11616' 8293'
Shublik 'B' 11655' 8319'
Shublik 'C' 11670' RECEIVED
Top of Sadlerochit 11701 8351'
- .~. ~ !"~
Zone 4A 11795' 8417'
A~aSka 0il & Gas Cons. C0rnmissi0~
Zone 3 11900' 8492'' "' "'~~'nch0r~e
Zone 2C 11972' 8545'
Zone 2B 12032' 8589'
Zone 2A 12172' 8690'
Zone 1B 12210' 8718'
Zone lA 12301' 8785'
Base of Sadlerochit 12348' 8821'
31. List of Attachments: Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble ~"'~'"'~" ~.. Title TechnicalAssistant Date
11-28A 200-095 Prepared By Name/Numbec Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
BP AMOCO Page I of 5
Operations Summar Report
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 8/8/2000
Event Name: REENTER+COMPLETE Start: 8/7/2000 End: 8/26/2000
Contractor Name: NABORS Rig Release: 8/26/2000 Group: RIG
Rig Name: NABORS 7ES Rig Number: 7ES
iDate ::From,To HourS ActiVity code :PhaSe ~OescriptionofOperations
8/7/2000 00:00 - 04:00 4.00 CONS PERS PRE Laid plywood with rig on standby, Tool Service personnel unavailable
due to two rig moves ongoing.
04:00 - 10:00 6.00 MOVE PRE Moved rig from DS 6 to DS 11.
10:00 - 23:30 13.50 RIGU PRE Lay mats and herculite. Spot sub, pits, cuttings tank. Finish berming.
Raised derrick. Raise cattle chute, bridal down. Hook up top drive.
Hang bridal lines. Bring equipment from rig maint to rig floor, XO's,
elevators, slips, saver subs.
23:30 - 00:00 0.50 KILL PRE Held pre-spud safety meeting. Rig accepted at 23:30 hrs 08-07-00.
8/8/2000 00:00 - 00:30 0.50 WHSUR INT1 Install Blanking Flange On Tree
00:30 - 01:30 1.00 WHSUR INT1 PJU Lines to Tree
01:30- 02:00 0.50 WHSUR: INT1 Pull BPV
02:00 - 03:00 1.00 WHSUR INT1 Displace Diesel From Well
03:00 - 03:30 0.50 WHSUR INT1 PJD Lines & Blow Down Same
03:30 - 04:00 0.50 WHSUR INT1 Set TWC, Test to 1000psi ! ~'~,~ ~,
04:00 - 05:00 1.00 WHSUR INT1 N/D Tree i;~J ~'~ ~ ~
05:00 - 07:30 2.50 BOPSUIq INT1 N/U BOP
!07:30-08:30 1.00 BOPSUI:; INT1 PJUto Test BOP ~a~J(a0it&GasCot3s. Col~ilmis~ri
'08:30 - 14:00 5.50 BOPSUI:; INT1 Test BOP, 250 Low, 3500 High, Witnessj~ll~(~Ji~C, ChuckShieve
14:00 - 15:00 1.00 PULL INT1 BOLDS, Pull HGR to Rotaty, Gained 21
15:00 - 15:30 0.50 PULL INT1 RJU TBG Tools
15:30 - 18:00 2.50 PULL INT1 Pull & L/D 74 jt 3.5:" 9.3~ EUE L80 R-3 TBG
18:00 - 19:30 1.50 CLEAN INT1 Pull Wear Bushing, Set Test Plug, Test Lower Pipe Rams to 250 Iow
3500 High, Pull Plug, Set Wear Ring
19:30 - 00:00 4.50 DRILL INT1 P/U 4" DP & RIH
8/9/2000 00:00 - 01:00 1.00 S'I'WHIP INT1 Continue P/U DP & RIH
01:00 - 03:00 2.00 STWHIP INT1 POH Std Back BHA
03:00 - 05:00 2.00 s'rWHIP INT1 P/U BHA # ! :Start Mill, Lower Srting Mill, Upper String Mill, 1X HWDP,
9X61/2 DC, Drlg Jars, 12 HWDP, XO
05:00 - 06:00 1.00 STWHIP INT1 Tack Weld Retainer Plates on Iron Roughneck Spinner
06:00 - 09:30 3.50 STWHIP INT1 P/U 4"DP & RIH to 5362, Take wts & Torque
09:30 - 12:00 2.50 STWHIP INT1 POH L/D Jars
12:00 - 13:00 1.00 S'I'WHIP INT1 R/U Schlumberger, GPJCCL EZSV PJSM
13:00 - 14:30 1.50 s'rWHIP INT1 Log GR/CCL, Identify Sand Above CSG Collar, Set EZSV @ 5293
(3'Above Collar) in Sandstone
14:30 - 15:00 0.50 STWHIP INT1 POH & R/D Schlumberger
15:00 - 15:30 0.50 STWHIP INT1 Test EZSV & CSG to 3000 30 minutes
15:30 - 17:30 2.00 STWHIP INT1 PJSM, PU Whipstock Assy,Start Mill,Lower String MilI,HWDP,(X6.5
DC, Jar, 12 HWDP,XO
17:30 - 20:00 2.50 STWHIP INT1 RIH to 5241, Wash Down W/Whipstock Towards EZSV @ 5293
20:00 - 20:30 0.50 S-I'WHIP INT1 Initial Pump Pressure 1570 psi @ 588 gpm, Good Signal FRom MWD,
Lost 600 psi Pump Pressure, Check Pumps, OK, Put Pumps Back on
Hole, Still loosing Pressure, an Additional 75 psi
20:30 - 22:30 2.00 STWHIP INT1 POH Wet Looking For Washout,
22:30 - 00:00 1.50 STWHIP INT1 Handle BHA, No Visual Sign of Washout
8/10/2000 00:00 - 02:00 2.00 S'I'WHIP OTHR INT1 RIH W/BHA, ReTorque ea Connection, Changed Shear Bolt Whipstock
02:00 - 03:00 1.00 STWHIP OTHR INT1 Slip & Cut 150' Drill Line
03:00 - 06:00 3.00 STWHIP OTHR INT1 TIH W/Whipstock, Torque Check Every Break
06:00 - 07:30 1.50 STWHIP INT1 Orient & Set Whipstock @ 52 R, Top of Window 5272
07:30 - 12:30 5.00 STWHIP INT1 Cut Window from 5272-5301, Bottom of Whipstock 5295
12:30 - 13:30 1.00 STWHIP INT1 Circ Lo/Hi Sweeps Around, Work Window Area
13:30 - 14:00 0.50 STWHIP INT1 Flow Check, Pull 2 stds into CSG
14:00 - 14:30 0.50 STWHIP INT1 Break Circ, Close Bag, Perform LOT= 4117 TVD, 9.8 Mud, 430 PSI=
Printed: 8/30/2000 2:15:36 PM
Operations Summary Report [i V ¢ 3 £003
Legal Well Name: 11-28 ~ ~ a~~~ ~. ~B~
Common Well Name: 11-28 ~~te: 8/8/2000
Event Name: REENTER+COMPLETE Sta~: 8~/2000 End: 8/26/2000
Contractor Name: NABORS Rig Release: 8/26/2000 Group: RIG
Rig Name: NABORS 7ES Rig Number: 7ES
:
Date. From, To HOurs: Activi~ c~e:: Phase : Description of OperationS
8/10/2000 14:00 - 14:30 0.50 S~HIP INT1 11.8 ~/gal EMW
14:30 - 17:30 3.00 S~HIP INT1 POH W~hipstock, Unifo~ Wear on Mills
17:30 - 18:00 0.50 S~HIP INT1 Flush/Jet Stack, Fun~ion Rams
18:00 - 18:30 0.50 S~HIP INT1 Sewi~ Wear Ring
18:30 - 19:00 0.50 DRILL INT1 Clear Floor
19:00 - 21:00 2.00 DRILL LNR1 P/U BHA & Orient
21:00 - 23:00 2.00 DRILL LNR1 RIH Break Circ & Orient 50 R, No Problem ~ TOW
23:00 - 00:00 1.00 DRILL LNR1 DRLG 8 1/2 Hole f/5301-5339 AST .5 Hrs
8/11/2000 00:00 - 12:00 12.00 DRILL LNR1 DRLG to 60~, Pumping Weighted Visc Sweeps, ART 2.5 AST 5 HRS
12:00 - 13:00 1.00 DRILL LNR1 Change Swab & Liner ~ 1 Pump
13:00 - 21:00 8.00 DRILL LNR1 DRLG to 6673, ART 5.5, AST 1.5 Hrs
21:00 - 21:30 0.50 DRILL LNR1 Change Swab ~1 Pump, Cylinder ~2
21:30-00:~ 2.50 DRILL LNR1 DRLG to 6798, ART2, AST1.5Hrs, Hi Vis Sweep Eve~ 1~'
8/12/2000 00:00 - 07:30 7.50 DRILL LNR1 Drlg to 7361 AST 1, ART 4.25 Hrs
07:30 - 09:00 1.50 DRILL LNR1 Pump Hi Vis Sweep, Repeat Suweys
09:00 - 09:30 0.50 DRILL LNR1 Drop ESS, Pump D~ Job
09:30 - 13:00 3.50 DRILL LNR1 POH, Tight Spots ~ 6880, 6854, 6729, 6130 & Troube Pulling BHA
Through Window
13:00- 16:00 3.00 DRILL ]LNR1 POH
16:00 - 18:30 2.50 DRILL LNR1 Handle BHA, Download MWD
18:30 - 20:00 1.50 DRILL LNR1 ]P/U New BiFMotor, Orient MWD
20:00 - 22:00 2.00 DRILL LNR1 RIH to 5200 ', Fill Pipe
22:00 - 22:30 0.50 DRILL LNR1 Orient to Window
22:30 - 00:00 1.50 DRILL LNR1 RIH to 7342, No Problem Geffing Through Window
8/13/2000 00:00 - 00:30 0.50 DRILL LNR1 Pump Lo Hi Visc, Weighted Sweep
00:30 - 12:00 11.50 DRILL LNR1 Drlg to 8091; AST 2, ART 6.5, ROP while Slide 50-70 ~hr, 100-200
While Drlg
12:00 - 00:00 12.00 DRILL LNR1 Drlg to 8744; AST 2.5 ART 5, Pumping Lo/Hi Sweeps eve~ 300'
8/14/2000 00:00 - 12:00 12.00 DRILL LNR1 Drlg & Su~ey to 9397, Sweep hole with 34 bbl LoVis/35 bbl Weighted
HiVis Eve~ 300'
12:00 - 19:00 7.00 DRILL LNR1 Drlg & Suwey as above, Torque, Drag, & Pump Pressure Increase,
Redu~d ROP
19:00 - 20:30 1.50 DRILL LNR1 Circ Lo/Hi Sweep,Rotate & Reciprocate Pipe, Increase In CuEings
Returns
20:30- 00:00 3.50 DRILL LNR1 Drlg
8/15/2000 00:00 - 07:00 7.00 DRILL LNR1 Drilled from 9894 ff. to 10,238 ff. Sliding time - 2 hrs. Rotating time -
3.5 hrs.
07:00 - 10:00 3.00 DRILL LNR1 Pumped Hi-Lo sweep and circulated hole clean. Flow check.
10:00 - 15:30 5.50 DRILL LNR1 POOH to condu~ BOPE test at regular 7 day intewal per desire of
AOGCC agent. Flow check at BHA for 10 min. Held weekly tool
pusher safety meeting. PJSM in ~mp
15:30 - 17:30 2.00 DRILL LNR1 Stood back BHA. Clear floor.
17:30 - 20:30 3.00 DRILL LNR1 Pulled wear ring. Tested BOPE, choke manifold, safety valve, da~
valve, hose to 250/3500 psi per SSD and AOGCC requirements. Had
to repair boEom IBOP. Witness of test waived by John Spalding,
AOGCC agent. Installed wear ring.
20:30 - 21:30 1.00 DRILL LNR1 Sewi~d top drive.
21:30 - 23:00 1.50 DRILL LNR1 Make up BHA ~.
23:00 - 00:00 1.00 DRILL LNR1 RIH to 2000 ff. PJSM at camp.
8/16/2000 00:00 - 01:30 1.50 DRILL LNR1 RIH to 4200 ff. Filled pipe and pump ~ 1 bpm.
01:30 - 02:30 1.00 DRILL LNR1 Cut drill line.
02:30 - 04:30 2.00 DRILL LNR1 Washed and reamed to 10,238 ff. Torque 16K ft-lbs. No fill.
Printed: 8/30/2000 2:15:36 PM
BP AMOCO Page 3 of 5
Operations Summa Repo
ke~al Well ~ame: ~ ~-28
Common Woll ~ame: ~ ~-28 Spud Date: 81812000
Event Name: REENTER+COMPLETE Sta~: 8~/2000 End: 8/26/2000
Contractor Name: NABORS Rig Release: 8~26~2000 Group: RIG
Rig Name: NABORS 7ES Rig Number: 7ES
Date From - To Hours ACtivi~ c~e Phase Description of Operations
8/16/2000 04:30 - 12:00 7.50 DRILL LNR1 Drilled to 10,517 ff. Added 1% EP Mudlube and redu~d torque from
16K to 10K E-lbs.
12:00 - 00:00 12.00 DRILL LNR1 Drill by rotating and sliding to 10,951 ff. Bit balled at 10,945 ff. Sliding
time - 2.5 hrs; Rotating time - 12 hrs.
8/17/2000 '00:00 - 04:00 4.00 DRILL LNR1 ~ Drilled from 10,951ff. to 11,050 ff.
04:00 - 05:00 1.00 DRILL ~LNR1 Repla~d swab & liner in ~2 pump.
05:00 - 12:00 7.00 DRILL LNR1 Drilled to 11,359 ff. ART-5.5 hrs.; AST-2.5 hrs.
12:00 - 18:30 6.50 DRILL LNR1 Drilled to 11,550 ff.
18:30 - 20:00 1.50 DRILL LNR1 CBU for geological samples.
20:00 - 20:30 0.50 DRILL LNR1 Drilled to 11,590 ff. ART-5.5 hrs.; AST-0 hrs.
20:30 - 22:30 2.00 DRILL LNR1 CBU for geological samples.
22:30 - 00:00 1.50 DRILL LNR1 Pump slug. Begin wiper trip to casing window.
8/18/2000 00:00 - 01:30 1.50 DRILL LNR1 POOH to 7149 ff. measuring DP.
01:30 - 02:30 1.00 DRILL LNR1 Circulated and took check su~ey for JORPS.
02:30 - 03:00 0.50 DRILL LNR1 Finsished wiper trip into casing at 5200 ff.
03:00 - 04:00 1.00 DRILL LNR1 Slip and cut drill line.
04:00 - 05:00 1.00 DRILL LNR1 RIH to 7149
05:00 - 06:00 1,00 DRILL LNR1 Circulated and took check su~ey for JORPS at 7050 ff.
06:00 - 07:00 1.00 DRILL LNR1 Continued RIH to 11,590 ff. TD. No fill following wiper trip.
07:00 - 10:30 3.50 DRILL LNR1 Circulated and conditioned mud to run liner. SpoEed liner mud pill
11,590-10,500 ff.
10:30 - 13:30 3.00 DRILL LNR1 Dropped DP rabbit. Check for flow. POOH to 6221 ff.
13:30 - 14:30 1.00 DRILL LNR1 Spotted liner running mud pill 6221-5200 ff.
14:30 - 16:30 2.00 DRILL LNR1 POOH to BHA.
16:30 - 19:00 2.50 DRILL LNR1 Laid down 6 3~4" directional BHA, loaded out and cleared floor.
19:00 - 20:00 1.00 DRILL LNR1 Rigged up 7" casing tools.
20:00 - 20:30 0.50 DRILL LNR1 PJSM re running 7" casing.
20:30 - 21:00 0.50 DRILL LNR1 Made up 7" float equipment and checked same - OK.
21:00 - 00:00 3.00: DRILL LNR1 RIH w/7" casing liner to 1980 ff.
8/19/2000 00:00 - 06:00 6.00 DRILL LNR1 RIH with 7" liner to 5047 ff. Stopped to replace elevators. Obtained
movement parameters inside casing at window.
06:00 - 08:30 2.50 DRILL LNR1 Circ. volume of liner and changed out elevators. Made up ~menting
head on DP single.
08:30 - 10:30 2.00 DRILL LNR1 Finished running 6466 ff. of 7" liner.
10:30 - 13:00 2.50 DRILL LNR1 Installed Baker Flex Lok liner hanger & ~P liner top packer.
Reciprocated and rotated liner while picking up hanger.
13:00 - 16:30 3.50 DRILL LNR1 Tripped in hole with 7" liner on 4" DP to 11,594 ff. Took pipe movement
parameters.
16:30 - 19:00 2.50 DRILL LNR1 Broke circulation at 3.0 bpm at 800 psi. Staged rate up to 8.5 bpm at
1900 psi. Held PJSM with Doweli, Baker, Peak and Nabors personnel.
19:00 - 20:45 1.75 DRILL LNR1 Cemented liner with 118 bbls. Class G cement mixed at 11.5 ppg and
33 bbls. Class G ~ment mixed at 15.8 ppg. Bumped pllug and set
liner hanger with 3200 psi. Floats held OK.
20:45 - 21:30 0.75 DRILL LNR1 Pressured DP to 4200 psi with Dowell and released HR se~ing tool.
Set Baker ~P liner top packer with 55K slack off weight.
21:30 - 22:30 1.00 DRILL LNR1 Circulated bosoms up from top of liner hanger at 5091 ff. while rotating
and reciprocating pipe. Recovered 30 bbls. preflush but no ~ment.
Mixed and pumped barite slug.
22:30 - 00:00 1.50 DRILL LNR1 POOH with DP and liner seeing tools.
8~20~2000 00:00 - 00:30 0.50 DRILL LNR1 Finished POOH with DP & liner seeing tools.
00:30 - 01:30 1.00 DRILL LNR1 Break out and lay down liner seeing tools and cementing head.
01:30 - 02:00 0.50 DRILL LNR1 Se~i~ top drive.
02:00 - 05:30 3.50 DRILL PROD1 Made up 4 3~4" PDM, LWD and MWD tools. PJSM nuclear logging
Printed: 8/30/2000 2:15:36 PM
,ECEIVED
BP AMOCO [:.,',': ;?' ~ ""~'"'0 ¢,,:jt,iO Page 4 of 5
Operations SUmma
Legal Well Name: 11-28
Common Well Name: 11-28 Spud Date: 8/8/2000
Event Name: REENTER+COMPLETE Start: 8/7/2000 End: 8/26/2000
Contractor Name: NABORS Rig Release: 8/26/2000 Group: RIG
Rig Name: NABORS 7ES Rig Number: 7ES
Date From 'To HoUrs Activi~ Code PhaSe: ~ DescriPtiOn of operations
:
8/20/2000 02:00 - 05:30 3.50 DRILL PROD1 tools. Picked up HWDP, jars, etc per BHA #5.
05:30 - 08:00 2.50 DRILL PROD1 RIH with BHA #5 to 5500 ft. and tested MWD tools.
08:00 - 08:30 0.50 DRILL PROD1 Picked up 27 joints 4" DP.
08:30 - 11:00 2.50 DRILL PROD1 RIH with BHA #5 and tagged landing collar at 11,507 ft.
11:00 - 13:30 2.50 DRILL PROD1 Circulated and conditioned mud.
13:30 - 14:30 1.00 DRILL PROD1 Tested 9 5/8" casing and 7" liner to 3000 psi with 100 psi leakoff in 30
mins. OK.
14:30 - 17:30 3.00 DRILL PROD1 Drilled float collar and cement from shoe track with 4-6K WOB at 1-2
rain/ft.
17:30 - 19:30 2.001 DRILL PROD1 Changed out 10.7 ppg LSND mud with 8.4+ppg QuikDrlnN mud.
19:30 - 20:00 0.50 DRILL PROD1 Drilled 20 ft. new hole to 11,614 ft.
20:00 - 21:00 1.00 DRILL PROD1 Performed FIT to 475 psi. EMW - 9.53 ppg.
21:00 - 00:00 3.00 DRILL PROD1 Directionally drill by sliding to 11,665 ft. AST - 2 3/4 hrs. ART - 0 hrs.
8/21/2000 00:00 - 00:00 24.00 DRILL PROD1 Directionally drilled from 11,665 ft. to 12,362 ft. AST - 4.0 hrs;
ART- 14.25 hrs.
8/22/2000 00:00 - 04:30 4.50 DRILL PROD1 Drilled to planned TD of 12,455 ft.
04:30 - 07:00 2.50 DRILL PROD1 CBU and circulate HiVis sweep surface to surface.
07:00 - 07:30 0.50 DRILL PROD1 Short trip bit into casing.
07:30 - 09:00 1.50 DRILL PROD1 Service top drive. Slip and cut drill line.
09:00 - 09:30 0.50 DRILL PROD1 Short trip bit back to TD with no problems.
09:30 - 12:00 2.50 DRILL PROD1 CBU and circulate HiVis sweep surface to surface.
12:00 - 13:30 1.50 DRILL PROD1 Spot liner running mud pill in interval 11,580 - 12,455 ft.
Drop ESS survey tool and 2.375" DP rabbit.
13:30 - 14:00 0.50 DRILL PROD1 Pull bit to 11,455 ft and take JORPS survey.
~14:00 - 18:00 4.00 DRILL PROD1 POOH with bit to 3230 ft. Hole ceased to take proper fill at 3230 ft.
after acting normally for 100 stands.
18:00 - 19:30 1.50 DRILL PROD1 Investigated cause of well not taking proper mud fill. Checked surface
equipment. Pulled additional 15 stands with hole taking no mud. Well
static when not moving pipe.
19:30 - 00:00 4.50 DRILL PROD1 Began RIH with DP. Filled pipe at 3230 ft., 5222 ft. and 7369 ft. with
hole returning proper volume of mud for pipe run.
8/23/2000 00:00 - 03:00 3.00 DRILL DISP PROD1 Circulated bottoms up. Had no reservoir influx. Monitored well- static.
Spotted 30 bbl. liner pill from 12,455 ft. to 11,500 ft.
03:00 - 04:30 1.50 DRILL DISP PROD1 POOH with bit to 10,100ft. Mix and pump dry job. Monitor well - static.
04:30 - 09:00 4.50 DRILL DISP PROD1 POOH to BHA.
09:00 - 10:00 1.00 DRILL PROD1 Laid down BHA#5.
10:00 - 11:00 1.00 DRILL PROD1 Remove nuclear sources from LWD and download data.
11:00 - 12:00 1.00 DRILL PROD1 Finish laying down BHA.
12:00 - 13:00 1.00 CASE PROD1 Clear floor and rig up to run 4 1/2" liner.
13:00 - 13:15 0.25 CASE PROD1 PJSM with all personned.
13:15 - 21:30 8.25 CASE PROD1 Made up and checked shoe joints. Ran 25 joints 4 1/2" 12.6 #.ft, L-80
IBT liner, Baker liner hanger and liner top packer. RIH on 4" drill pipe
filling every 900 ft.
21:30 - 22:00 0.50 CASE PROD1 Circulated pipe volume at 7" casing shoe.
22:00 - 22:30 0.50 CASE I PROD1 RIH with liner to 12,455 ft. TD.
22:30 - 00:00 1.50 CEMT PROD1 Installed cementing head. Circulated and conditioned mud while
reciprocating liner. Preparing to cement.
8~24~2000 00:00 - 01:10 1.17 CEMT PROD1 Circulate and condition mud. Maximum circulation rate of 6 1/4 bpm,
1350 psi. Held PJSM with Dowell, Baker, Peak, Nabors and Baroid
personned. Began mixing cement and preflush at 00:30.
01:10 - 01:15 0.08 CEMT PROD1 Pumped 5 bbl freshwater and tested lines to 4500 psi.
01:15 - 02:15 1.00 CEMT PROD1 Pumped additional 5 bbls freshwater, 30 bbls. Dowell B-45 spacerand
Printed: 8/30/2000 2:15:36 PM
( (REC!
BP AMOCO ;".~'~ =' ~i ,,~ "n.-,., Page 5 of 5
OPerations Summary RelatOr&_
Legal Well Name: 11-28 Anchorage
Common Well Name: 11-28 Spud Date: 8/8/2000
Event Name: REENTER+COMPLETE Start: 8/7/2000 End: 8/26/2000
Contractor Name: NABORS Rig Release: 8/26/2000 Group: RIG
Rig Name: NABORS 7ES Rig Number: 7ES
Date FrOm,To Hours ACtivitY COde :Phase Descriptionofo ratOns___.pe_~__j~___
8/24/2000 01:15 - 02:15 1.00 CEMT PROD1 26 bbls. Class G cement mixed at 15.8 ppg. Washed up lines to
cementing head, dropped drill pipe wiper plug. Pumped 20 bbls. hi vis
3erforation pill mud and displaced cement from drill pipe with rig pump
with 108.1 bbls. mud at final pressure of 1600 psi at 6.0 bpm.
02:15 - 02:30 0.25 CEMT PROD1 Bumped plug with 3200 psi and set hydraulic liner hanger. Pressured
drill pipe to 4200 psi with Dowell and set Baker ZXP liner top packer.
Released setting tool.
02:30 - 06:30 4.00 CEMT ;PROD1 Circulated bottoms up at liner hanger and recovered freshwater spacer,
preflush and estimated 4.0 bbls cement. Cleaned mud pits and
displaced mud from wellbore with seawater.
06:30 - 07:30 1.00 CEMT PROD1 i Rigged down cementing equipment and laid down cementing head.
Cleared floor.
07:30 - 11:00 3.50 CEMT PROD1 POOH with drill pipe to 7282 ft.
11:00 - 13:00 2.00 CEMT PROD1 Shut down rig operations for 1.0 hour for SAFETY STANDDOWN to
review and discuss recent fatalities in BP organization with both
Hoffman and Henson crews.
13:00 - 18:30 5.50 CEMT PROD1 Finished lay down drill pipe. BOP TEST DUE 8/22/00 AND
EXTENDED WHILE RUNNING 4 1/2" LINER WAIVED BY JEFF
JONES, AOGCC AGENT, DUE TO WELL'S BEING CASED AND
UNPERFORATED.
18:30 - 19:30 1.00 RUNCO~I COMP Tested 9 5/8" casing, 7" liner and 4 1/2" liner to 3000 psi for 30 rains. -
OK.
19:30 - 21:00 1.50 RUNCO~I COMP Pulled wear ring, slipped and cut drill line.
21:00 - 21:30 0.50 RUNCO~I COMP PJSM and rig up to run completion.
21:30 - 00:00 2.50 RUNCO~ COMP Made up WLEG, X nipple, Baker Packer and RIH picking up 3 1/2"
tubing and gas lift mandrels.
8/25/2000 00:00 - 08:30 8.50 RUNCOr COMP Continued to RIH for completion picking up 3 1/2" tubing.
'08:30 - 09:00 0.50 RUNCOr COMP Jim Denny held BOP drill and safety shutdown with Hoffman crew.
09:00 - 11:30 2.50 RUNCO~ COMP Finished picking up tubing. Spaced out tubing, installed tubing hanger
and landed hanger with EOT at 11,414 ft.
11:30 - 15:00 3.50 RUNCOk COMP Reverse circulated well with filtered seawater adding Corexit packer
fluid treatment at 110 gals per 450 bbls.
15:00 - 18:00 3.00 RUNCO~ COMP Dropped ball rod and set Baker S-3 packer at 11,370 ft. with 3500 psi.
Tested tubing to 3500 psi for 30 mins. -OK. Tested annulus to 3000 psi
for 30 mins - OK. Sheared RP valve in GLM at 4706 ft.
18:00 - 20:00 2.00 RUNCOI~ COMP Installed TWC and nippled down DOPE.
20:00 - 23:00 3.00 RUNCOr~ COMP Installed Christmas tree and tested to 5000 psi. Rigged up DSM with
lubricator and pulled TWC.
23:00 - 00:00 1.00 RUNCOI~ COMP Rigged up Little Red and freeze protected 9 5/8" X 3 1/2" annulus with
145 bbls. used diesel.
8/26/2000 00:00 - 02:30 2.50 RUNCOI~ COMP Finished pumping 145 bbl diesel freeze protect. Installe BPV valve in
tree. U-tube equalized diesel from annulus to tubing.
02:30 - 04:00 1.50 RUNCOr~I COMP Blew down fluid lines and rigged down drilling rig. Released rig at 0400
hrs.
Printed: 8/30/2000 2:15:36 PM
Date
8/29/2000:
8/31/2000:
9/07/2000:
9/08/2000:
· 9/13/2000:
9/19/2000:
9/30/2000:
10/02/2000:
RIG SIDETRACK INITIAL PERFORATION
Event Sumnmry
RECEIVED
A t~,,a,., ex,, ,. -
Installed GLV's.
RIH & tagged PBTD @ 12209' SLM. Ran Mem GR/CCL log f/PBTD to GLM#1.
Performed FCO to 12368'.
RIH & tagged PBTD @ 12356' SLM.
MIRU ELU. PT'd equip to 3000 psi. RIH w/perf guns & tied-into EWR/DGR Log
dated 8/24/2000. Shot 24' of initial perforations f/:
12320'-12344' MD (Zone IA)
Used 2-1/2" carriers & all shots @ 6 SPF. POOH w/guns - ASF. RD ELU (more
perfs to follow at latter date).
RIH & tagged PBTD @ 12350' MD.
MIRU ELU. PT'd equip to 3000 psi. RIH w/perf guns & logged tie-in. Positioned
guns in shooting zone. Flowed well to achieve underbalanced condition. Shot 14' of
perforations f/:
12288'- 12302' MD (Zone lB)
Used 2-1/2" carriers & all shots @ 6 SPF. Tagged PBTD @ 12364' MD & POOH w/
guns. ASF. RD ELU. Well BOL - this is the first day of production for 11-28A.
Performed well test. Results for a 3.3 hour test (calculated for 24 hr rate) are below:
Oil 1216 bbls
Water 0 bbls
Gas 24838 MSCFD
FTP 390 psi
FM GOR 20426
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 11
11-28A IIFR
Surveyed: 22 August, 2000
SURVEY REPORT
4 October, 2000
Your Reft API-500292195801
Surface Coordinates: 5952460.80 N, 707240.21 E (70° 16'24.7802"N, 148° 19' 24.8335" W)
Kelly Bushing: 56.28ft above Mean Sea Level
Survey Ref: svy9953
Sperry-Sun Drilling Services
Survey Report for 11-28A IIFR
Your Ref: AP1-$00292195801
Surveyed: 22 August, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
5261.73 50.800
5272.00 50.820
5296.15 51.69o
5328.18 52.990
5359.99 53.19o
5390.80 52.920
5420,92 52.660
5451.24 52,520
5483.36 52,190
5515.57 51.680
5545.30 51.49o
5576.o8 51.42o
5607.76 51.160
5639.o6 51.23o
5668.76 51.24o
57oo.81 51.51o
5732.97 51,51o
5763.40 51.880
5793.28 51.810
5825.11 51.97o
5886,71 51.o8o
5978.85 50.530
6071.63 49.970
6163.45 50.360
6258.72 49.580
Azim.
309.988
309.990
309.990
312.590
315.64o
318.59o
321.470
324,380
326.490
327.690
327.1oo
327.070
328.17o
327.740
327.670
326.700
324.200
323.900
322.820
322.920
321.9oo
321.560
325.000
322.910
321.630
Sub-Sea
Depth
(ft)
4037.38
4O43.87
4058.98
4078.56
4097.66
4116.18
4134,40
4152.82
4172.44
4192.30
4210.77
4229.95
4249.77
4269.38
4287.98
4307.98
4328.00
4346.86
4365.32
4384.97
4423.29
4481.52
4540.86
4599.68
4660.96
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
4093.66
4100.15
4115.26
4134.84
4153.94
4172.46
4190.68
4209.10
4228.72
4248.58
4267.05
4286.23
4306.05
4325.66
4344.26
4364.26
4384.28
4403.14
4421.60
4441.25
4479.57
4537.80
4597.14
4655.96
4717.24
1900.54 N 2132.91W 5954301.88 N 705055.77 E
1905.66 N 2139.01W 5954306.83 N 705049.53 E
1917.76 N 2153.44W 5954318.53 N 705034.77 E
1934.50 N 2172.49W 5954334.73 N 705015.27 E
1952.20 N 2190.74W 5954351.92 N 704996.53 E
1970.24 N 2207.50W 5954369.49N 704979.29 E
1988.62N 2222.91W 5954387.44N 704963.38 E
2007.83 N 2237.42W 5954406.25 N 704948.34 E
2028.77 N 2251.85W 5954426.78 N 704933.34 E
2050.06 N 2265.63W 5954447.68 N 704918.98 E
2069.68 N 2278.18W 5954466.95 N 704905.89 E
2089.89 N 2291.26W 5954486.80 N 704892.26 E
2110.76 N 2304.50W 5964507.30 N 704878.45 E
2131.44 N 2317.44W 5954527.61N 704864.95 E
2151.01N 2329.82W 5954546.84 N 704852.04 E
2172.06 N 2343.39W 5954567.50 N 704837.89 E
2192.79 N 2357.66W 5954587.83 N 704823.06 E
2212.12 N 2371.68W 5954606.76 N 704808.51 E
2230.97 N 2385.70W 5954625.22 N 704793.97E
2250.94 N 2400.82W 5954644.77 N 704778.31 E
2289.15 N 2430.23W 5954682.16 N 704747.86 E
2345.21N 2474.46W 5954736.98 N 704702.10 E
2402.37 N 2517.11W 5954792.94 N 704657.90 E
2459.37 N 2558.59W 5954848.78 N 704614.86 E
2517.07 N 2603.23W 5954905.22 N 704568.65 E
Dogleg
Rate
(°/lOOft)
0.195
3.602
7.600
7.692
7.702
7.664
7.637
5.302
3.333
1.681
0.240
2.831
1.094
0.187
2.510
6.084
1.441
2.852
0.560
1.941
0.662
2.914
1.799
1.315
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
2854.19
2862.13
2880,92
2906.24
2931.67
2956.26
2980.11
3003.91
3028.85
3053.57
3076.24
3099.70
3123.74
3147.43
3169.95
3194.34
3219.02
3242.54
3265.74
3290.49
3338.22
34O9.00
3479.41
3548.89
3621.10
Tie-on Survey to GCT Gyro
Window Point
AK-6 BP_IFR-AK
Continued...
4 October, 2000 -23:05 -2. DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A IIFR
Your Ref: API-500292195801
Surveyed: 22 August, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
6350,20 49.510 321.740 4720.32 4776.60
6442.56 49.250 321.970 4780.45 4836.73
6532.77 48.460 319.240 4839.81 4896.09
6629.83 48,890 317.920 4903.90 4960.18
6726,19 48.330 316.780 4967.61 5023.89
6819.56 48.890 313,780 5029.36 5085.64
6912.11 49.140 311.240 5090.06 5146.34
7003.88 48,890 311.740 5150.25 5206.53
7100.57 48.850 311.300 5213.85 5270.13
7198.93 49.540 311.790 5278,13 5334.41
7289.67 48.690 314.060 5337.52 .5393.80
7382,25 48.990 313.880 5398.46 5454.74
7475.80 49.750 314.310 5459.37 5515.65
7566.68 48.090 314.390 5519.09 5575.37
7662.51 47.110 317.770 5583.72 5640.00
7755.94 46.570 319.300 5647.63 5703.91
7849.31 46.470 318.370 5711.88 5768.16
7943.77 46.880 319.080 5776.69 5832.97
8036.63 47.370 318.880 5839.87 5896.15
8131.54 47.570 318.140 5904,03 5960.31
8224.01 48.790 317.180 5965.69 6021.97
8317,87 49,650 318.060 6026,99 6083.27
8410.11 48.490 315,050 6087.43 6143.71
8504.90 49.960 315.030 6149.33 6205.61
8597.42 47.590 315.280 6210,30 6266.58
2571.69 N 2646.38W 5954958.63 N 704524.01 E
2626,82 N 2689.69W 5955012.55 N 704479.20 E
2679.31N 2732.78W 5955063.84 N 704434.68 E
2733,97 N 2781.01W 5955117.14 N 704384.97 E
2787.14 N 2829.98W 5955168.94 N 704334.55 E
2836,90 N 2879.26W 5955217.33 N 704283.91 E
2884.09 N 2930.76W 5955263.09 N 704231.13 E
2929.99 N 2982.65W 5955307,54 N 704178.00 E
2978.27 N 3037.18W 5955354.29 N 704122.16 E
3027,64 N 3092.90W 5955402.12 N 704065.10 E
3074.35 N 3143.13W 5955447.42N 704013.60 E
3122.74 N 3193.30W 5955494.42 N 703962.12 E
3172.15 N 3244.29W 5955542.40 N 703909.79 E
3220.03 N 3293.27W 5955588.92N 703859.51 E
3270.98 N 3342.36W 5955638.49 N 703809.04 E
3322.05 N 3387.48W 5955688.30 N 70~762.52 E
3373.05 N 3432.08W 5955738.05 N 703716.54 E
3424.69 N 3477.41W 5955788.43 N 703669.81E
3476.04 N 3522.07W 5955838.52 N 703623.74 E
3528.43 N 3568.41W 5955889.61N 703575.98 E
3579.36 N 3614.82W 5955939.25 N 703528.18 E
3631.86 N 3662.73W 5955990.41N 703478.85 E
3682.45 N 3710.63W 5956039.67 N 703429.58 E
3733.25 N 3761.35W 5956089.04 N 703377.48 E
3782.58 N 3810.42W 5956137.01N 703327.07 E
Dogleg
Rate
(°ll00ft)
0.119
0.339
2.441
1.113
1.061
2.484
2.089
0.493
0.345
0.796
2.110
0.356
0.884
1.828
2.798
1.327
0.731
0.698
0.551
0,612
1.529
1,159
2.767
1.551
2.570
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
3690.11
3759.58
3827.07
3899.74
3971.92
4041.94
4111.76
4180.96
4253.71
4328.09
4396.67
4466.37
4537.36
4605.87
4676.57
4744.52
4812.04
4880.54
4948.35
5018.09
5086.87
5157.81
5227.42
5299.20
5368.77
rn
Continued..,
4 October, 2000 - 23:05 - 3 - DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A IIFR
Your Ref: AP1-$00292195801
Surveyed: 22 August, 2000
North Slope Alaska
Measured
Depth
(fi)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Fastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
8689.60 48.230 314.880 6272.09 6328.37
8782.59 48.420 314,940 6333.92 6390.20
8874.38 48.270 313.840 6394.93 6451.21
8970.03 47.610 314.750 6459.01 6515.29
9063.79 46.570 316.410 6522.84 6579.12
9157.25 46.990 315.870 6586.84 6643.12
9247.10 47.190 316.160 6648.02 6704.30
9343.65 47.290 316.990 6713.57 6769.85
9437.31 47.310 316.530 6777.09 6833.37
9530.87 47.460 316.030 6840.43 6896.71
9623.23 47.340 314.680 6902.95 6959.23
9716.80 47.270 315.050 6966.40 7022.68
9809.82 47.430 316.690 7029.43 7085.71
9901.14 47.470 316.220 7091.18 7147.46
9996.02 47.160 315.810 7155.51 7211.79
10090.37 47.120 314.840 7219.68 7275.96
10181.13 47.570 317.300 7281.19 7337,47
10277.01 47.580 318.210 7345.87 7402.15
10369.31 47.290 316.700 7408.31 7464.59
10460.52 47.210 314.150 7470.23 7526.51
10557.36 48.560 316.750 7535.17 7591.45
10648.93 50.350 320.650 7594.71 7650.99
10745.59 50.480 319.400 7656.30 7712.58
10838.19 50.220 319.070 7715.39 7771.67
10932.50 50.330 316.770 7775.67 7831.95
3831.02 N 3858.72W 5956184.10 N 703277.45 E
3880.05 N 3907.91W 5956231.76 N 703226.93 E
3928.03 N 3956.92W 5956278.37 N 703176.62 E
3977.62 N 4007.75W 5956326.54 N 703124.44 E
4026.65 N 4055.81W 5956374.23 N 703075.04 E
4075.76 N 4103.01W 5956422.02 N 703026.52 E
4123.11N 4148.71W 5956468.09 N 702979.53 E
4174.59 N 4197.43W 5956518.22 N 702929.40 E
4224.74 N 4244.59W 5956567.04 N 702880.88 E
4274.50 N 4292.17W 5956615.47 N 702831.95 E
4322.87 N 4339.95W 5956662.51N 702782.86 E
4371.38 N 4388.69W 5956709.66 N 702732.80 E
4420.49 N 4436.32W 5956757.43 N 702683.83 E
4469.25 N 4482.67W 5956804.90 N 702636.16 E
4519.43 N 4531.11W 5956853.73 N 702586.36 E
4568.61N 4579.73W 5956901.55 N 702536.40 E
4616.68 N 4626.03W 5956948.33 N 702488.80 E
4669.07 N 4673.61W 5956999.39 N 702439.79 E
4719.15 N 4719.57W 5957048.19 N 702392.47 E
4766.86 N 4766.57W 5957094.58 N 702344.17 E
4818.05 N 4816.94W 5957144.37 N 702292.41 E
4870.33 N 4862.83W 5957195.36 N 702245.10 E
4927.41N 4910.68W 5957251.11N 702195.69 E
4981.41N 4957.24W 5957303.80 N 702147.67 E
5035.24 N 5005.84W 5957356.27 N 702097.59 E
Dogleg
Rate
(°/lOOfl)
0.765
0.210
0.910
0.987
1.706
0.616
0.325
0.640
0.362
0.425
1.084
0.300
1.308
0.382
0.456
0.755
2.054
0.701
1.245
2.055
2.431
3.780
1.006
0.393
1.879
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
5437.16
5506.61
5575.19
5646.21
5714.85
5782.92
5848.69
5919.51
5988.27
6057.08
6125.05
6193.81
6262.20
6329.42
6399.12
6468.27
6534.97
6605.60
6673.47
6740.42
6812.22
6881.56
6955.66
7026.67
7099.05
Continued...
4 October, 2000- 23:05 - 4 - DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A IIFR
Your Ref: API-500292195801
Surveyed: 22 August, 2000
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
Global Coordinates
Northings Eastings
(ft) (ft)
11023.82 50.500 316.620 7833.86 7890.14 5086.46 N 5054.12 W
11120.15 49.830 317.340 7895.57 7951.85 5140.54 N 5104.58 W
11211.57 46.740 318.820 7956.40 8012.68 5191.29 N 5150.18 W
11304.00 45.230 318.360 8020.62 8076.90 5241.15 N 5194.15 W
11398.42 45.480 317.930 8086.97 8143.25 5291.18 N 5238.97 W
11492.40 46.490 317.550 8152.27 8208.55 5341.20 N 5284.42 W
11535.74 46.850 317.000 8182.01 8238.29 5364.36 N 5305.81 W
11642.82 47.640 310.090 8254.75 8311.03 5418.44 N 5362.76 W
11674.20 46.470 303.810 8276.14 8332.42 5432.24 N 5381.09 W
11704.81 44.720 299.550 8297.56 8353.84 5443.73 N 5399.68 W
11735.75 45.580 296.980 8319.38 8375.66 5454.12 N 5419.00 W
11793.74 45.130 296.810 8360.14 8416.42 5472.78 N 5455.80 W
11889.75 43.610 299.040 8428.77 8485.05 5504,20 N 5515.12 W
11983.76 42.820 297.310 8497.28 8553.56 5534.60 N 5571.85 W
12076.74 44.160 295.510 8564.74 8621.02 5563.05 N 5629.17 W
12170.88 43.220 297.160 8632.81 8689.09 5591.89 N 5687.44 W
12265.47 41.770 298.210 8702.56 8758.84 5621.56 N 5744.03 W
12362.02 40.180 298.660 8775.45 8831.73 5651.71 N 5799.70 W
12394.67 39.050 299.970 8800.60 8856.88 5661.90 N 5817.85 W
12455.00 39.050 299.970 8847.46 8903.74 5680.88 N 5850.78 W
5957406.14 N 702047.93 E
5957458.81 N 701995.99 E
5957508.29 N 701949.01 E
5957556.91 N 701903.69 E
5957605.70 N 701857.51 E
5957654.44 N 701810.70 E
5957677.00 N 701788.68 E
5957729.50 N 701730.26 E
5957742.79 N 701711.56 E
5957753.76 N 701692.66 E
5957763.61 N 701673.06 E
5957781.25 N 701635.76 E
5957811.03 N 701575.60 E
5957839.85 N 701518.05 E
5957866.71 N 701459.98 E
5957893.93 N 701400.93 E
5957922.04 N 701343.55 E
5957950.64 N 701287.06 E
5957960.33 N 701268.64 E
5957978.40 N 701235.20 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 27.213° (30-Aug-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well Reference and calculated along an Azimuth of 314.156° (True),
Based upon Minimum Curvature type calculations, at a Measured Depth of 12455.00ft.,
Dogleg
Rate
(°/lOOft)
0.225
0.902
3.589
1.672
0.418
1.113
1.242
4.794
15.112
11.467
6.511
0.804
2.268
1.515
1.963
1.569
1.706
1.675
4.304
0.000
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
7169.35
7243.23
7311.31
7377.58
7444.59
7512.04
7543.52 ~'
7622.05
7644.82
7666.16
7687.257726.65'"
7791.10
7852.98
7913.92
7975.82
8037.09
8098.03
8118.15 Last Survey
8155.00 Projected Survey
4 October, 2000 - 23:05 . $. DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A IIFR
Your Ref: AP1-$00292195801
Surveyed: 22 August, 2000
North Slope Alaska
The Bottom Hole Displacement is 8155.00ft., in the Direction of 314.156° (True).
Comments
Measured
Depth
(ft)
5261.73
5272.00
12394.67
12455.00
Station Coordinates
TVD
(fi)
4093.66
4100.15
8856.88
8903.74
Northings Eastings Comment
(~) (~)
1900.54 N 2132.91W Tie-on Su~eyto GCT Gyro
1905.66 N 2139.01W Window Point
5661.90 N 5817.85W Last Suwey
5680.88 N 5850.78W Projected Suwey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
5296.15 4115.26
To
Measured Vertical
Depth Depth
(ft) (ft)
5296.15 4115.26
12455.00 8903.74
Survey Tool Description
AK-1 BP_HG - BP High Accuracy Gyro
AK-6 BP_IFR-AK
Alaska State Plane 4
PBU_EOA DS 11
4 October, 2000 - 23:05 - 6 - DrillQuest 1.05.05
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 11
11-28A MWD
Surveyed: 11 August, 2000
SURVEY REPORT
4 October, 2000
Your Ref: API-500292195801
Surface Coordinates: 5952460.80 N, 707240.21 E (70° 16' 24.7802" N,
Kelly Bushing: 56.28ft above Mean Sea Level
148° 19' 24.8335" W)
Survey Ref: s vy9951
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: AP1-$00292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured
Depth
(fi)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
5261.72 50.800 309.988 4037.37 4093.65
5272.00 50.820 309.990 4043.87 4100.15
5296.15 51.690 309.990 4058.98 4115.26
5328.18 52.990 312.590 4078.56 4134.84
5359.99 53.190 315.640 4097.66 4153.94
5390.80 52.920 318.590 4116.18 4172.46
5420.92 52.660 321.470 4134.40 4190.68
5451.24 52.520 322.780 4152.82 4209.10
5483.36 52.180 324.040 4172.44 4228.72
5515.57 51.680 327.400 4192.31 4248.59
5545.30 51.490 327.570 4210.78 4267.06
5576.08 51.420 325.640 4229.96 4286.24
5607.76 51.160 324.420 4249.77 4306.05
5639.06 51.230 325.110 4269.39 4325.67
5668.76 51.240 328.860 4287.99 4344.27
5700.81 51.510 324.300 4308.00 4364.28
5732.97 51.510 325.160 4328.02 4384.30
5763.40 51.880 322.380 4346.88 4403.16
5793.28 51.810 320.700 4365.34 4421.62
5825.11 51.970 323.700 4384.99 4441.27
5886.71 51.090 319.050 4423.32 4479.60
5978.85 50.530 317.790 4481.55 4537.83
6071.63 49.970 323.850 4540.91 4597.19
6163.45 50.360 322.870 4599.72 4656.00
6258.72 49.580 320.370 4661.01 4717.29
1900.54 N 2132.91W 5954301.88 N 705055.77 E
1905.66 N 2139.01W 5954306.83 N 705049.53 E
1917.76 N 2153.44W 5954318.53 N 705034.77 E
1934.50 N 2172.49W 5954334.73 N 705015.27 E
1952.20 N 2190.74W 5954351.92 N 704996.53 E
1970.24 N 2207.50W 5954369.49 N 704979.29 E
1988.62 N 2222.91W 5954387.44 N 704963.38 E
2007.62N 2237.69W 5954406.04 N 704948.08 E
2028.04 N 2252.85W 5954426.03 N 704932.36 E
2048.99 N 2267.13W 5954446.58 N 704917.51 E
2068.63 N 2279.65W 5954465.87 N 704904.45 E
2088.73 N 2292.90W 5954485.59 N 704890.65 E
2108.99 N 2307.07W 5954505.45 N 704875.93 E
2128.91N 2321.14W 5954524.98 N 704861.32E
2148.32 N 2333.76W 5954544.04 N 704848.17 E
2169.21N 2347.54W 5954564.54 N 704833.82 E
2189.76 N 2362.08W 5954584.68 N 704818.72 E
2209.02 N 2376.19W 5954603.54 N 704804.09 E
2227.42 N 2390.80W 5954621.53 N 704788.97 E
2247.20 N 2406.15W 5954640.88 N 704773.09 E
2284.87 N 2436.23W 5954677.71N 704741.98 E
2338.29 N 2483.62W 5954729.80 N 704693.14 E
2393.53 N 2528.66W 5954783.78 N 704646.59 E
2450.10 N 2570.74W 5954839.17 N 704602.97 E
2507.28 N 2616.01W 5954895.09 N 704556.14 E
Dogleg
Rate
(°/~OOft)
0.195
3.602
7.600
7.692
7.702
7,664
3.463
3.281
8.357
0.780
4.909
3.115
1.732
9.844
11.146
2.093
7.271
4.427
7.433
6.080
1.222
5.057
0.923
2.170
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
2853.93
2861.88
2880.66
2905.98
2931.41
2956.00
2979.86
3003.72
3028.82
3053.67
3076.35
3099.86
3124.15
3148.13
317o.72
3195.17
3219.92
3243.47
3266.78
3291.58
3339.41
3410.63
3481.44
3551.06
3623.40
Tie-on Survey to GCT
survey
Window Point
MWD Magnetic
Continued.,.
4 October, 2000 - 23:04 - 2 - DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: API-500292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured
Depth
(fi)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
6350.20 49.510 323.860 4720.37 4776.65
6442,56 49.250 322.390 4780.51 4836.79
6532.77 48.450 318.720 4839.88 4896.16
6629.83 48.890 318,850 4903.98 4960.26
6726,19 48.330 320.130 4967.69 5023.97
6819.56 48.890 315.150 5029.44 5085.72
6912.11 49.140 311,440 5090.16 5146.44
7003.88 48.890 313.230 5150.35 5206.63
7100.57 48.850 313,020 5213.95 5270.23
7198.93 49.540 312.330 5278.22 5334.50
7289.67 48.690 312.920 5337.62 5393.90
7382,25 48.990 311.900 5398.55 5454.83
7475.80 49,750 312.540 5459.47 5515.75
7566.68 48.090 314.570 5519.19 5575.47
7662.51 47.110 318.760 5583.82 5640.10
7755.94 46.570 317.810 5647.73 5704.01
7849.31 46.470 320.290 5711.98 5768.26
7943.77 46,880 318.340 5776.80 5833.08
8036.63 47.370 318.110 5839.98 5896.26
8131.54 47.510 320.020 5904.18 5960.46
8224.01 48.790 317.550 5965.88 6022.16
8317.87 49.650 319.520 6027.19 6083.47
8410.11 48.490 315.870 6087.63 6143.91
8504.90 49.960 318.290 6149.54 6205.82
8597.42 47,590 315.310 6210,5! 6266.79
2562.20 N 2658.75W 5954948,81 N 704511.91 E
2618.28 N 2700.81W 5955003.71N 704468.31 E
2670.73 N 2743.95W 5955054,95 N 704423.75 E
2725.56 N 2791.97W 5955108.43 N 704374.24 E
2780.51N 2838.93W 5955162.08 N 704325.78 E
2832.24 N 2886.11W 5955212.48 N 704277.20 E
2880,13 N 2936.94W 5955258.95 N 704225.06 E
2926.78 N 2988.15W 5955304.17 N 704172.59 E
2976.56 N 3041.31W 5955352.48 N 704118.08 E
3027.03 N 3096.04W 5955401.41N 704061.98 E
3073.48 N 3146.52W 5955446.46 N 704010.24 E
3120.49 N 3197.98W 5955492.03 N 703957.50 E
3168.20 N 3250.56W 5955538.27 N 703903.63 E
3215.38 N 3300.21W 5955584.08 N 703852.70 E
3266.82 N 3348.77W 5955634.15 N 703802.74 E
3317.69 N 3394.12W 5955683.76 N 703756.01 E
3368.85 N 3438.51W 5955733.68 N 703710.22 E
3420.95 N 3483.31W 5955784.53 N 703664.01 E
3471.70 N 3528.65W 5955834.01N 703617.29 E
3524.51N 3574.44W 5955885.54 N 703570.06 E
3576.31N 3619.83W 5955936.06 N 703523.26 E
3629.57 N 3666.88W 5955988.01N 703474.76 E
3681.10 N 3713.76W 5956038.23 N 703426.48 E
3733.67 N 3762.62W 5956089.44 N 703376.19 E
3784.41N 3810.22W 5956138.84 N 703327.21E
Dogleg
Rate
(°llOOft)
2.904
1.240
3.189
0.464
1.154
4.046
3.038
1.497
0.169
0.880
1.058
0.891
0.964
2.484
3.386
0.940
1,930
1.563
0.558
1.490
2.424
1.834
3.243
2.478
3.525
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
3692.34
3761.61
3829.10
3901.76
3973.75
4043.64
4113.47
4182,70
4255.51
4329.93
4398.51
4468.17
4539.12
4607,61
4678.28
4746,27
4813.77
4882.22
4950.11
5019.76
5088.42
5159.29
5228.83
5300.51
5370.01
Continued.,.
4 October, 2000- 23:04 -3- DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: AP1.$00292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
8689.60 48.230 317.800 6272.30 6328.58
8782.59 48.420 316.350 6334.14 6390.42
8874.38 48.270 316.640 6395.14 6451.42
8970.03 47.610 318.300 6459.22 6515.50
9063.79 46.570 314.120 6523.07 6579.35
9157.25 46.990 313.880 6587.07 6643.35
9247.10 47.190 318.540 6648.27 6704.55
9343.65 47.290 316.860 6713.82 6770.10
9437.31 47.310 315.840 6777.34 6833.62
9530.87 47.460 314.890 6840.68 6896.96
9623.23 47.340 313.310 6903.20 6959.48
9716.80 47.270 317.790 6966.67 7022.95
9809.82 47.430 318.770 7029.69 7085.97
9901.14 47.470 314.900 7091.46 7147.74
9996.02 47.160 315.410 7155.79 7212.07
10090.37 47.120 313.960 7219.97 7276.25
10181.13 47.570 318.750 7281.48 7337.76
10277.01 47.580 316.460 7346.17 7402.45
10369.31 47.290 315.260 7408.60 7464.88
10460.52 47.210 313.100 7470.52 7526.80
10557.36 48.560 319.140 7535.50 7591.78
10648.93 50.350 321.370 7595.02 7651.30
10745.59 50.480 318.200 7656.63 7712.91
10838.19 50.220 318.230 7715.71 7771.99
10932.50 50.330 316.180 7775.99 7832.27
3834.07 N 3857.25W 5956187.19 N 703278.84 E
3884.93 N 3904.55W 5956236.72 N 703230.15 E
3934.67 N 3951.76W 5956285.15 N 703181.59 E
3986.99 N 3999.77W 5956336.13 N 703132.16 E
4036.56 N 4047.25W 5956384.37 N 703083.33 E
4083.87 N 4096.24W 5956430.31N 703033.05 E
4131.35 N 4141.76W 5956476.52 N 702986.25 E
4183.78 N 4189.46W 5956527.62 N 702937.12 E
4233.58 N 4236.97W 5956576.09 N 702888.25 E
4282.58 N 4285.35W 5956623.74 N 702838.55 E
4329.89 N 4334.17W 5956669.68 N 702788.44E
4378.96 N 4382.30W 5956717.41N 702738.97 E
4430.02 N 4427.83W 5956767.20 N 702692.06 E
4479.07 N 4473.84W 5956814.97N 702644.72 E
4528.52 N 4523.02W 5956863.04 N 702594.19 E
4577.15 N 4572.19W 5956910.30 N 702543.70 E
4625.44 N 4618.23W 5956957.30 N 702496.35 E
4677.70 N 4665.94W 5957008.23 N 702447.22 E
4726.48 N 4713.28W 5957055.69 N 702398.55 E
4773.16 N 4761.31W 5957101.02 N - 702349.26 E
4824.92 N 4811.03W 5957151.39 N 702298.13 E
4878.42 N 4855.50W 5957203.65 N 702252.21 E
4935.29 N 4903.58W 5957259.18 N 702202.57 E
4988.46 N 4951.09W 5957311.01 N' 702153.61 E
5041.68 N 5000.37W 5957362.86 N 702102.89 E
Dogleg
Rate
(°/lOOft)
2.121
1.182
0.287
1.462
3.448
0.487
3.805
1.282
0.801
0.764
1.266
3.519
0.794
3.122
0.513
1.127
3.912
1.763
1.008
1.741
4.831
2.692
2.531
0.282
1.676
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
5438.35
5507.72
5576.25
5647.15
5715.75
5783.86
5849.60
5920.35
5989.14
6057.98
6125.96
6194.68
6262.93
6330.11
6399.85
6469.00
6535.67
6606.31
6674.27
6741.23
6812.97
6882.16
6956.29
7027.42
7099.85
Continued...
4 October, 2000.23:04 - 4 - DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: AP1-500292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate
(fi) (fl) (fl) (ft) (ft) (ft) (ft) (°/lOOft)
11023.82 50.500 316.100 7834.18 7890,46 5092.42 N 5049.13 W 5957412.24 N 702052.75 E 0.198
11120.15 49.830 317.680 7895.89 7952.17 5146.42 N 5099.69 W 5957464.82 N 702000.73 E 1.439
11211.57 46.740 320.960 7956.73 8013.01 5198.12 N 5144.19 W 5957515.28 N 701954.82 E 4.312
11304.00 45.230 320.570 8020.95 8077.23 5249.60 N 5186.23 W 5957565.59 N 701911.38 E 1.662
11398.42 45.480 316.920 8087.31 8143.59 5300.09 N 5230.51 W 5957614.83 N 701865.72 E 2.763
11492.40 46.490 318.610 8152.61 8208.89 5350.13 N 5275.93 W 5957663.60 N 701818.94 E 1.681
11535.74 46.850 319.210 8182.35 8238.63 5373.89 N 5296.65 W 5957686.78 N 701797.57 E 1.305
11612.08 47.990 317.660 8234.01 8290.29 5415.94 N 5333.95 W 5957727.79 N 701759.13 E 2.113
11642.82 47.640 310.060 8254.67 8310.95 5431:70 N 5350.35 W 5957743.10 N 701742.31 E 18.349
11674,20 46.470 304.030 8276.06 8332.34 5445.54 N 5368.66 W 5957756.42 N 701723.62 E 14.548
11704.81 44.720 299.500 8297.48 8353.76 5457.06 N 5387.23 W 5957767.42 N 701704.74 E 12.017
11735.75 45.580 297,130 8319.30 8375.58 5467.45 N 5406.54 W 5957777.29 N 701685.15 E 6.100
11793.74 45.130 296.720 8360.05 8416.33 5486.14 N 5443.33 W 5957794.95 N 701647.86 E 0.925
11889.75 43.610 297.950 8428.68 8484.96 5516.96 N 5502.97 W 5957824.11 N 701587.39 E 1.819
11983.76 42.820 297.060 8497.20 8553.48 5546.69 N 5560.06 W 5957852.26 N 701529.50 E 1.061
1207'6.74 44.160 295.850 8564.65 8620.93 5575.19 N 5617.35 W 5957879.17 N 701471.45 E 1.697
12170.88 43.220 297.160 8632.73 8689.01 5604.20 N 5675.55 W 5957906.57 N 701412.48 E 1.386
12362.02 40.180 298.620 8775.42 8831.70 5663.63 N 5787.93 W 5957962.88 N 701298.50 E 1.670
12394.67 39.050 299.880 8800.58 8856.86 5673.79 N 5806.10 W 5957972.54 N 701280.06 E 4.246
12455.00 39.050 299.880 8847.43 8903.71 5692.73 N 5839.05 W 5957990.56 N 701246.60 E 0.000
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 27.213° (30-Aug-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well Reference and calculated along an Azimuth of 314.273° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12455.00ft.,
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
717o.2o
7244.09
7312,o4
7378.o8
7445.03
7512.49
7543.91
7599.97
7622.72
7645.49
7666.83
7687.91
7727.29
7791.51
7853.15
7914.o6
7975.98
8097,94
8118.o4
8154.86
Last Survey Station
Projected Survey
4 October, 2000 - 23:04 - 5- DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: API.500292195801
Surveyed: 11 August, 2000
North Slope Alaska
The Bottom Hole Displacement is 8154.86ft., in the Direction of 314.273° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings Comment
(ft) (ft) (ft) (ft)
5261.73 4093.66 1900.54 N 2132.91 W Tie-on Survey to GCT survey
5272.00 4100.15 1905.66 N 2139.01 W Window Point
12394.67 8856.86 5673.79 N 5806.10 W Last Survey Station
12455.00 8903.71 5692.73 N 5839.05 W Projected Survey
Survey tool program
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (fi) (ft)
0.00 0.00 5296.15 4115.26
5296.15 4115.26 12455.00 8903.71
Survey Tool Description
AK-1 BP_HG - BP High Accuracy Gyro
MWD Magnetic
Alaska State Plane 4
PBU_EOA DS 11
DrillQuest 1.05.05
4 October, 2000 - 23:04 - 6 -
05-Sep-O0
AOGCC
Lori Taylor
3001 PorcUpine Drive
Anchorage, AK 99501
MWD + IFR (Definitive)
Re: Distribution of Survey Data for Well 11-28A
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window /Kickoff Survey
Projected Survey:
5,261.73' MD
5,272.00' MD
12,455.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Kenneth W. Allen
Survey Manager
Attachment(s)
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 11
11-28A
Surveyed: 22 August, 2000
ORIGINAL
SURVEY REPORT
1 September, 2000
Your Ref: API-500292195801
Surface Coordinates: 5952460.80 N, 707240.21 E (70° 16' 24.7802" N, 148° 19' 24.8335" W)
Kelly Bushing: 56.28ft above Mean Sea Level
OlqlL. I_iN'H
RECEIVED
SEP 0 8
Alaska Oil & Gas Co~,s. Com~:ission
Anchorage
Survey Ref: evy9955
Sperry-Sun Drilling Services
Survey Report for 11-28A
Your Ref: AP1.500292195801
SurveyS: 22 Augumt, 2000
North Slope Alaska
Measured
Depth
(fi)
Incl.
5261.73 50.800
5272.00 50.820
5296.15 51.69o
5328.18 52.990
5359.99 53.190
5390.80 52.920
5420.92 52.660
5451.24 52.520
5483.36 52.19o
5515.57 51.680
5545,30 51.49o
5576.08 51.420
5607.76 51.160
5639.06 51.23o
5668.76 51,240
57o0.81 51.51o
5732.97 51.51o
5763.40 51.88o
5793.28 51.810
5825.11 51,970
5886,71 51.080
5978.85 50.530
6071.63 49.970
6163.45 50,360
6258.72 49.580
Azim.
Sub-Sea Vertical Local Coordinates
Depth Depth Northinga Eaatlnge
(ft) (ft) (fi) (fi)
309.988 4037.38 4093.66 1900.54N 2132.91W
309.990 4043.87 4100.15 1905,66N 2139.01W
309.990 4058,98 4115.26 1917.76 N 2153.44W
312,590 4078.56 4134.84 1934.50N 2172.49W
315,640 4097.66 4153.94 1952.20 N 2190.74W
318,590 4116.18 4172.46 1970.24 N 2207,50W
321.470 4134.40 4190.68 1988.62 N 2222,91W
324.380 4152,82 4209.10 2007.83N 2237.42W
326.490 4172.44 4228.72 2028.77N 2251.85W
327.690 4192.30 4248.58 2050.06N 2265.63W
327.100 4210.77 4267.05 2069.68N 2278.18W
327.070 4229.95 4286.23 2089.89 N 2291.26W
328.170 4249.77 4306.05 2110.76N 2304.50W
327.740 4269,38 4325.66 2131.44N 2317.44W
327.670 4287.98 4344.26 2151.01N 2329.82W
326.700 4307.98 4364.26 2172.06 N 2343.39W
324.200 4328.00 4384,28 2192.79 N 2357.66W
323.900 4346.86 4403.14 2212.12 N 2371.68W
322.820 4365.32 4421.60 2230.97N 2385.70W
322,920 4384.97 4441.25 2250.94 N 2400.82W
321.900 4423.29 4479.57 2289.15 N 2430.23W
321.560 4481.52 4537.80 2345.21N 2474.46W
325.000 4540.86 4597,14 2402.37 N 2517.11W
322.910 4599.68 4655.96 2459.37N 2558.59W
321.630 4660.96 4717.24 2517.07N 2603.23W
Alaska State Plane 4
PBU_EOA DS 11
Global Coordinates Dogleg Vertical
Northlnga Eaetlngs Rate Section
(ft) (ft) (o/lOOft) (ft)
5954301.88 N 705055.77 E 2854.19
5954306.83 N 705049.53 E 0.195 2862.13
5954318.53 N 705034.77 E 3.602 2880.92
5954334.73 N 705015.27 E 7,600 2906.24
5954351.92 N 704996.53 E 7,692 2931.67
5954369.49 N 704979.29 E 7.702 2956.26
5954387.44N 704963.38 E 7.664 2980.11
5954406.25 N 704948.34E 7.637 3003.91
5954426.78 N 704933.34 E 5.302 3028.85
59~r-'~4~7.68 N 704918.98 E 3.333 3053.57
5954466.95 N 704905.89 E 1.681 3076.24
5954486.80 N 704892.26 E 0.240 3099.70
5954507.30 N 704878.45 E 2,831 3123,74
5954527.61N 704864.95 E 1.094 3147.43
5954546.84 N 704852.04 E 0.187 3169.95
5954567.50 N 704837.89 E 2.510 3194.34
5954587.83 N 704823.06 E 6.084 3219.02
5954606.76 N 704808.51 E 1.441 3242.54
5954625.22 N 704793.97 E 2.852 3265.74
5954644.77 N 704778.31E 0.560 3290.49
5954682.16 N 704747.86 E 1.941 3338.22
5954736.98 N 704702.10 E 0.662 3409,00
5954792.94 N 704657.90 E 2,914 3479,41
5954848,78 N 704614.86 E 1.799 3548.89
5954905.22 N 704568.65 E 1.315 3621.10
RECEIVED
-2-
Comment
Tie-on Io GCT gyro
Window Point
AK-6 BP,.IFR-AK
Continued..,
.....................................
DrlllOuest 1.05.04e
September, 2000- 7:09
Sperry-Sun Drilling Services
Survey Report for 11-28A
Your Ref: API.500292195801
Surveyed: 22 August, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
6350.20 49.510 321.740
6442.56 49.250 321.970
6532.77 48.460 319.240
6629.83 48.890 317.920
6726.19 48.330 316.780
6819.56 48.890 313.780
6912.11 49.140 311.240
7003.88 48.890 311.740
7100,57 48.850 311.300
7198.93 49.540 311.790
7289.67 48.690 314.060
7382.25 48.990 313.880
7475.80 49.750 314.310
7566.68 48.090 314.390
7662.51 47.110 317.770
7755.94 46.570 319.300
7849.31 46.470 318.370
7943.77 46.880 319.080
8036.63 47.370 318.880
8131.54 47,570 318.140
8224.01 48.790 317.180
8317.87 49.650 318.060
8410.11 48.490 315.050
8504.90 49.960 315.030
8597.42 47.590 315.280
Sub-Sea
Depth
(fi)
Vertical Local Coordinates Global Coordinates
Depth Northings Eestlngs Northings Eestings
(~) (fi) (~) (ft) (~)
4720.32 4776.60 2571,69 N 2646.38W
4780.45 4836.73 2626.82N 2689.69W
4839.81 4896.09 2679.31N 2732.78W
4903.90 4960.18 2733.97 N 2781.01W
4967.61 5023.89 2787.14 N 2829.98W
5029.36 5085.64 2836.90 N 2879.26W
5090.06 5146.34 2884.09N 2930.76W
5150.25 5206.53 2929,99 N 2982.65W
5213.85 5270.13 2978.27N 3037.18W
5278.13 5334.41 3027.64N 3092.90W
5337.52 5393.80 3074.35 N 3143.13W
5398.46 5454.74 3122.74N 3193,30W
5459.37 5515.65 3172.15 N 3244.29W
5519.09 5575.37 3220.03 N 3293.27W
5583.72 5640.00 3270.98 N 3342.36W
5647.63 5703.91 3322.05 N 3387,48W
5711.88 5768.16 3373.05 N 3432.08W
5776.69 5832.97 3424.69 N 3477.41W
5839.87 5896.15 3476:04N 3522.07W
5904.03 5960.31 3528.43 N 3568.41W
5965.69 6021.97 3579.36 N 3614.82W
6026.99 6083.27 3631.86 N 3662.73W
6087.43 6143.71 3682.45 N 3710.63W
6149.33 6205.61 3733.25 N 3761.35W
6210.30 6266.58 3782.58 N 3810.42W
Alaska State Plane 4
PBU_EOA DS 11
5954958.63 N 704524.01 E
5955012.55 N 704479.20 E
5955063.84 N 704434,68 E
5955117.14 N 704384.97 E
5955168.94 N 704334.55 E
5955217.33 N 704283.91 E
5955263.09 N 704231.13 E
5955307.54 N 704178.00 E
5955354.29 N 704122.16 E
5955402.12 N 704065.10 E
5955447.42 N 704013.60 E
5955494.42 N 703962.12 E
5955542.40 N 703909.79 E
5955588.92 N 703859.51 E
5955638.49 N 703809.04 E
5955688.30 N 703762.52 E
5955738.05 N 703716.54 E
5955788.43 N 703669.81 E
5955838.52 N 703623.74 E
5955889.61 N 703575.98 E
5955939.25 N 703528.18 E
5955990.41 N 703478.85 E
5956039.67 N 703429.58 E
5956089.04 N 703377.48 E
5956137.01 N 703327.07 E
Dogleg Vertical
Rate Section
(°ll00ft) (fi)
0.119 3690.11
0.339 3759.58
2.441 3827.07
1.113 3899.74
1.061 3971.92
2.484 4041.94
2.089 4111.76
0.493 4180,96
0.345 4253.71
0.796 4328.09
2.110 4396,67
0.356 4466.37
0.884 4537.36
1.828 4605.87
2.798 4676.57
1.327 4744.52
0.731 4812.04
0.698 4880,54
0.551 4948.35
0.612 5018.09
1.529 5086.87
1.159 5157.81
2.767 5227.42
1.551 5299.20
2.570 5368.77
RECEIVED
Comment
Continued...
I September, 2000- 7:09
-3-
Alask= 0[! & G~.s Co~,s. Commission
DrlllQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 11-28A
Your Ref: API-500292195801
Surveyed: 22 August, 2000
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 11
Measured
Depth
(fi)
Incl.
Azlm.
Sub-Sea
Depth
(ft)
Vertical Local Coordinatea Global Coordinates
Depth Northinga Fastings Northinge Fastings
ffi) ffi) (~) ffi)
Dogleg Vertical
Rate Section
(°/100ft) (fi)
Comment
8689.60 48.230 314.880 6272.09 6328.37
8782.59 48.420 314.940 6333.92 6390.20
8874.38 48.270 313.840 6394.93 6451.21
8970.03 47.610 314.750 6459.01 6515.29
9063.79 46.570 316.410 6522.84 6579.12
9157.25 46.990 315.870 6586.84 6643.12
9247.10 47.190 316.160 6648.02 6704.30
9343.65 47.290 316.990 6713.57 6769.85
9437.31 47.310 316.530 6777.09 6833.37
9530.87 47.460 316.030 6840.43 6896.71
9623.23 47.340 314.680 6902.95 6959.23
9716.80 47.270 315.050 6966.40 7022.68
9809.82 47.430 316.690 7029.43 7085.71
9901.14 47.470 316.220 7091.18 7147.46
9996.02 47.160 315.810 7155.51 7211.79
10090.37 47.120 314.840 7219.68 7275.96
10181.13 47.570 317.300 7281.19 7337.47
10277,01 47.580 318.210 7345.87 7402.15
10369.31 47.290 316.700 7408.31 7464.59
10460.52 47.210 314.150 7470.23 7526.51
10557.36 48.560 316.750 7535.17 7591.45
10648.93 50.350 320.650 7594.71 7650.99
10745.59 50.480 319.400 7656.30 7712.58
10838.19 50.220 319.070 7715.39 7771.67
10932.50 50.330 316.770 7775.67 7831.95
3831.02N 3858.72W 5956164.10 N 703277.45 E
3880.05 N 3907.91W 5956231.76 N 703226.93 E
3928.03N 3956.92W 5956278.37 N 703176.62 E
3977.62 N 4007.75W 5956326.54 N 703124.44E
4026.65 N 4055.81W 5956374.23 N 703075.04E
4075.76 N 4103.01W 5956422.02 N 703026.52 E
4123.11N 4146,71W 5956468.09 N 702979.53 E
4174.59N 4197.43W 5956518.22 N 702929.40 E
4224.74N 4244.59W 5956567.04N 702880.88 E
4274.50 N 4292.17W 5956615.47 N 702831.95 E
4322.87N 4339.95W 5956662.51N 702782.86 E
4371.38 N 4388.69W 5956709.66 N 702732.80 E
4420.49 N 4436.32W 5956757.43 N 702683.83 E
4469.25 N 4482.67W 5956804.90 N 702636.16 E
4519.43N 4531.11W 5956853.73 N 702586.36 E
4568.61N 4579.73W 5956901.55 N 702536.40 E
4616.68 N 4626.03W 5956948.33 N 702488.80 E
4669.07N 4673.61W 5956999.39 N 702439.79 E
4719.15 N 4719.57W 5957048.19 N 702392.47 E
4766.86 N 4766.57W 5957094.58 N 702344.17 E
4818.05 N 4816.94W 5957144.37 N 702292.41 E
4870.33 N 4862.83W 5957195.36 N 702245.10 E
4927.41N 4910.68W 5957251.11N 702195.69 E
4981.41N 4957.24W 5957303.80 N 702147.67 E
5035.24 N 5005.84W 5957356.27 N 702097.59 E
0.765 5437.16
0.210 5506.61
0.910 5575.19
0.987 5646.21
1.706 5714.85
0.616 5782.92
0.325 5848.69
0.640 5919.51
0.362 5988.27
0.425 6057.08
1.084 6125.05
0.300 6193.81
1.308 6262.20
0.382 6329.42
0.456 6399.12
0.755 6468.27
2.054 6534.97
0.701 6605.60
1.245 6673.47
2.055 6740.42
2.431 6812.22
3.780 6881.56
1.006 6955.66
0.393 7026,67
1.879 7099.05
R[C[IV[D
SEP 0
~ ~ ! ~ ? .! Continued...
G~3 L,u,~S.-~-C .....L.:,tO.. DrlllOueet 1.05.04e
Anchorage
I September, 2000 - 7:09 - 4 '
Sperry-Sun Drilling Services
Survey Report for 11-28A
Your Ref: API.500292195801
Surveyed: 22 August, 2000
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 11
Measured Sub-Sea Vertical
Depth Incl, Azim. Depth Depth
(ft) (fi) (ft)
Local Coordinates
Northlnga Ee~tlnga
(fi) (ft)
Global Coordinates
Northlng$ Eaatlngs
(ft) (ft)
Dogleg Vertical
Rate Section
(o/lOOft) (fi)
Comment
11023.82 50.500 316.620 7833.86 7890.14
11120.15 49.830 317.340 7895.57 7951.85
11211.57 46.740 318.820 7956.40 8012.68
11304.00 45.230 318.360 8020.62 8076.90
11398.42 45.480 317.930 8086.97 8143.25
11492,40 46.490 317.55o 8152.27 8208.55
11535.74 46.850 317.000 8182.01 8238.29
11642.82 47.640 310.090 8254.75 8311.03
11674.20 46.470 3o3.810 8276.14 8332.42
11704.81 44.720 299.550 8297.56 8353.84
11735.75 45.580 296.980 8319.38 8375.66
11793.74 45.13o 296.810 8360.14 8416.42
11889.75 43.61o 299.040 8428.77 8485.05
11983.76 42.820 297.310 8497.28 8553.56
12076.74 44.16o 295.51o 8564.74 8621.02
1217o.88 43.220 297.160 8632.81 8689.09
12265.47 41.770 298.210 8702.56 8758.84
12362.02 4o. 180 298.660 8775.45 8831.73
12394.67 39.050 299.970 8800.60 8856.88
12455.00 39.050 299.970 8847.46 8903.74
5086.46 N 5054.12W 5957406.14 N 702047.93 E
5140.54N 5104.58W 5957458.81N 701995.99 E
5191.29 N 5150,18W 5957508.29 N 701949.01E
5241.15 N 5194.15W 5957558.91N 701903.69 E
5291.18 N 5238.97W 5957605.70 N 701857.51E
5341.20 N 5264.42W 5957654.44 N 701810.70 E
5364.36 N 5305.81W 5957677.00 N 701788.68 E
5418.44N 5362.76W 5957729.50 N 701730.26 E
5432.24 N 5381.09W 5957742.79 N 701711.56 E
5443.73N 5399.68W 5957753.76 N 701692.66 E
5454.12 N 5419.00W 5957763.61N 701673.06 E
5472.78 N 5455.80W 5957781.25 N 701635.76 E
5504.20 N 5515.12W 5957811.03 N 701575.60 E
5534.60N 5571.85W 5957839.85 N 701518.05 E
5563.05 N ~ 5629.17W 5957866.71N 701459.98 E
5591.89 N 5687.44W 5957893.93 N 701400.93E
5621.56 N 5744.03W 5957922.04 N 701343.55 E
565111N 5799.70W 5957950.64 N 701287.06 E
5661.90 N 5817.85W 5957960.33 N 701268.64 E
5680.88 N 5850.78W 5957978.40 N 701235.20 E
0.225 7169.35
0.902 7243.23
3.589 7311.31
1.672 7377.58
0.418 7444.59
1.113 7512.04
1.242 7543.52
4.794 7622.05
15.112 7644.82
11.467 7666.16
6.511 7687.25
0.804 7726.65
2.268 7791.10
1.515 7852.98
1.963 7913.92
1.569 7975.82
1.706 8037.09
1.675 8098,03
4.304 8118.15
0.000 8155.00
Lasl Survey
Projected Survey
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 27.213° (30-Aug-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical .Section is from Well Reference and calculated along an Azimuth of 314.156° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12455.00ft.,
RECEIVED
SEP O,O
,., .,~,.- ..¢_,,,--.,= r'.r~;-,',,;-,ic-Sir',~'
/.nchoFage
1 September, 2000 - 7:09 ' $' DrlllQueet 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 11-28A
Your Ref: API.500292195801
Surveyed: 22 August, 2000
North Slope Alaska
The Bottom Hole Displacement is 8155.00ft., in the Direction of 314.156° (True).
Comments
Meaaured Station Coordinates
Depth TVD Northlngs Eeetlnge Comment
(fi) (~t) (~t) (ft)
5261.73 4093.66 1900.54 N 2132.91 W Tie-on to GCT gyro
5272.00 4100~15 1905.66 N 2139.01 W Window Point
12394.67 6856.88 5661.90 N 5817.85 W Last Survey
12455.00 8903.74 5680.88 N 5850.78 W Projected Survey
Alaska State Plane 4
PBU_EOA DS 11
Survey tool program
From To
Meaaured Vertical Measured Vertical
Depth Depth Depth Depth
(~t) (~t) (ft) (~t)
0.00 0o00 5296.15 4115.26
5296.15 4115.26 12455.00 8903.74
Survey Tool Description
AK-1 BP_HG - BP High Accuracy Gyro
AK-6 BP_IFR-AK ~
I September, 2000 - 7:09
-6-
RECEIVED
DrlllOuee! 1.05.04e
05-Sep-00
AOGCC
Lori Taylor
3001 Pomupine Drive
Anchorage, AK 99501
MWD
Re: Distribution of Survey Data for Well 11-28A
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
5,261.73' MD
5,272.00' MD
12,455.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Kenneth W. Allen
Survey Manager
SEP 0 8 '2000
Alaska 0il & Gas Cons. Commission
Anchorage
Attachment(s)
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 11
11-28A MWD
Surveyed: 11 August, 2000
ORIGINAL
SURVEY REPORT
1 September, 2000
Your Ref: API.500292195801
Surface Coordinates: 5952460:80 N, 707240.21 E (70° 16' 24.7802" N, 148° 19' 24.8335" W)
Kelly Bushing: 56.281t above Mean Sea Level
~Olq i L. i_ !N I~ IMIqVICM==
RECEIVED
SEP 0 8 2000
Alaska Oil & Gas Co.qs. Commission
Anchorage
Survey Ref: svy9951
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: API-500292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured
Depth
(It)
Incl.
Sub-Sea
Depth
(It)
5261.72 50.800 309.988 4037.37
5272.00 50,820 309.990 4043.87
5296.15 51.690 309,990 4058.98
5328.18 52.990 312,590 4078.56
5359.99 53.190 315.640 4097.66
5390.80 52,920 318.590 4116.18
5420.92 52,660 321.470 4134,40
5451.24 52.520 322.780 4152.82
5483.36 52.180 324.040 4172.44
5515.57 51.680 327.400 4192.31
5545.30 51.490 327.570 4210.78
5576.08 51,420 325,640 4229.96
5607.76 51,160 324.420 4249.77
5639.06 51.230 325.110 4269.39
5668.76 51.240 328.860 4287,99
5700.81 51.510 324,300 4308.00
5732.97 51.510 325,160 4328.02
5763.40 51.880 322.380 4346.88
5793.28 51,810 320,700 4365.34
5825.11 51.970 323.700 4384.99
5886.71 51.090 319,050 4423.32
5978,85 50.530 317.790 4481.55
6071.63 49.970 323,850 4540.91
6163.45 50,360 322,870 4599.72
6258.72 49.580 320.370 4661.01
Vertical Local Coordinates Global Coordinates
Depth Northings Esstings Northings Eastings
(It) (It) (~t) (It) (~t)
4093.65 1900.54 N 2132.91W 5954301.88 N 705055.77
4100.15 1905.66 N 2139.01W 5954306.83 N 705049.53
4115.26 1917.76 N 2153,44W 5954318.53 N 705034.77
4134.84 1934.50 N 2172.49W 5954334.73 N 705015.27
'4153.94 1952.20 N 2190.74W 5954351.92 N 704996.53
4172.46 1970.24 N 2207.50W 5954369.49 N 704979.29
4190.68 1988.62 N 2222.91W 5954387.44N 704963.38
4209.10 2007.62 N 2237.69W 5954406.04N 704948.08
4228,72 2028.04N 2252.85W 5954426.03 N 704932.36
4248.59 2048.99 N 2267.13W 595~446.58 N 704917.51
4267.06 2068.63 N 2279.65W 5954465.87 N 704904.45
4286,24 2088.73 N 2292.90W 5954465.59 N 704890.65
4306.05 2108.99 N 2307.07W 5954505.45N 704875.93
4325.67 2128.91N 2321.14W 5954524.98 N 704861.32
4344.27 2148.32 N 2333.76W 5954544.04 N 704848.17
4354.28 2169.21N 2347.54W 5954564.54N 704833.82
4384.30 2189.76 N 2362.08W 5954584.68 N 704818.72
4403.16 2209.02N 2376.19W 5954603.54 N 704804.09
4421.62 2227.42N 2390.80W 5954621.53 N 704788.97
4441.27 2247.20 N 2406.15W 5954640.88 N 704773.09
4479.60 2284.87 N 2436.23W 5954677.71N 704741.98
4537.83 2338.29 N 2483.62W 5954729.80 N 704693.14
45:97.19 2393.53 N 2528.66W 5954783.78N 704646.59
4656.00 2450.10 N 2570.74W 5954839.17 N 704602.97
4717.29 2507.28 N 2616.01W 5954895.09 N 704556.14
Alaska State Plane 4
PBU_EOA DS 11
Dogleg Vertical
Rate Section
(°/lOOIt) (fi)
Comment
E 2853.93
E 0.195 2861.88
E 3.602 2880.66
E 7.600 2905,98
E 7.692 2931.41
E 7.702 2956,00
E 7,664 2979.86
E 3.463 3003.72
E 3.281 3028.82
E 8.357 3053.67
E 0,780 3076.35
E 4,909 3099.86
E 3.115 3124.15
E 1,732 3148.13
E 9,844 3170.72
E 11.146 3195,17
E 2,093 3219.92
E 7,271 3243.47
E 4.427 3266.78
E 7,433 3291,58
E 6.080 3339.41
E 1.222 3410.63
E 5.057 3481.44
E 0.923 3551.06
E 2,170 3623.40
RECEIVED
Tie-on Survey to GCT
survey
Window Point
MWD Magnetic
08 '2 00
Continued...
1 September, 2000 - 7:11
-2-
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref : API.500292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured
Depth
(fi)
Incl.
6350.20 49.510
6442.56 49.250
6532.77 48.450
6629.83 48.890
6726.19 48,330
6819.56 48.890
6912.11 49.140
7003.88 48.890
7100.57 48.850
7198.93 49.540
7289.67 48.690
7382.25 48.990
7475.80 49.750
7566.68 48.090
7662.51 47.110
7755.94 46.570
7849.31 46.470
7943.77 46.880
8036.63 47.370
8131.54 47.510
8224.01 48.790
8317.87 49.650
8410.11 48.490
8504.90 49.960
8597.42 47.590
Azim.
323.860
322.390
318.720
318.850
320.130
315.150
311.440
313.230
313.020
312.330
312.920
311.900
312.540
314.570
318.760
317.810
320.290
318.340
318.110
320.020
317.550
319.520
315.870
318.290
315.310
Sub-Sea
Depth
(fi)
4720.37
4780.51
4839.88
4903.98
4967.69
5029.44
5090.16
5150.35
5213.95
5278.22
5337.62
5398.55
5459.47
5519.19
5583.82
5547.73
5711.98
5776.80
5839.98
5904.18
5965.88
6027.19
6087.63
6149.54
6210.51
Vertical Local Coordinates Global Coordinates
Depth Northings Eastinge Northlng$ Eestings
(~t) (~t) (~t) (~t) (~t)
4776.65 2562.20 N 2658.75W 5954948.81N 70451'1.91E
4836.79 2618.28 N 2700.81W 5955003.71N 704468.31E
4896.16 2670.73 N 2743.95W 5955054.95 N 704423.75 E
4960.26 2725.56 N 2791.97W 5955108.43N 704374.24 E
5023.97 2780.51N 2838.93W 5955162.08 N 704325.78 E
5085.72 2832.24 N 2886.11W 5955212.48N 704277.20 E
5146.44 2880.13 N 2936.94W 5955258.95N 704225.06 E
5206.63 2926.78 N 2988.15W 5955304.17 N 704172.59 E
5270.23 2976.56 N 3041.31W 5955352.48N 704118.08E
5334.50 3027.03 N 3096.04W 5955401.41N 704061.98 E
5393.90 3073.48 N 3146.52W 5955446.46 N 704010.24 E
5454.83 3120.49 N 3197.98W 5955492.03N 703957.50E
5515.75 3188.20 N 3250.56W 5955538.27 N 703903.63 E
5575.47 3215.38 N 3300.21W 5955554.08 N 703852.70E
5640.10 3266.82 N 3348.77W 5955634.15 N 703802.74E
5704.01 3317.69 N 3394.12W 5955683.76 N 703756.01E
5768.26 3368.85 N 3438.51W 5955733.68 N 703710.22 E
5833.08 3420.95 N 3483.31W 5955784.53 N 703664.01 E
5896.26 3471.70 N 3528.65W 5955834.01N 703617.29 E
5960.46 3524.51N 3574.44W 5955885.54N 703570.06 E
6022.16 3576.31N 3619.83W 5955936.06 N 703523.26 E
6083.47 3629.57N 3666.88W 5955988.01N 703474.76E
6143.91 3681.10 N 3713.76W 5956038.23 N 703426.48 E
6205.82 3733.67N 3762.62W 5956089.44N 703376.19 E
6266.79 3754.41N 3810.22W 5956138.84N 703327.21 E
Alaska State Plane 4
PBU_EOA DS 11
Dogleg
Rate
(°ll00ft)
Vertical
Section
(ft)
Comment
2.904
1.240
3.189
0.464
1.154
4.o46
3.o38
1.497
o.169
0.880
1.o58
o.891
0.964
2.484
3.386
0.940
1.93o
1.563
0.558
1.49o
2.424
1.834
3.243
2.478
3.525
3692.34
3761.61
3829.1o
39Ol.76
3973.75
4043.64
4113.47
4182.7o
4255.51
4329.93
4398.51
4468.17
4539.12
46o7.61
4678.28
4746.27
4813.77
4882.22
495O.ll
5o19.76
5088.42
5159.29
5228.83
530o.51
537O.Ol
RECEIVED
SEP 08,
Continued...
1 September, 2000- 7:11
-3-
Alaska Oil & Gas Cons. Commission
Anchorage
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: API.500292195801
Surveyed: 11 August, 2000
North Slope Alaska
Meaeured
Depth
(fi)
Incl.
Azim.
Sub-Sea
Depth
8689.60 48.230 317.800 6272.30
8782.59 48.420 316.350 6334.14
8874.38 48.270 316.640 6395.14
8970.03 47.610 318.300 6459.22
9063.79 46.570 314.120 6523.07
9157.25 46.990 313.880 6587.07
9247.1o 47.190 318.540 6648.27
9343.65 47.290 316.860 6713.82
9437.31 47.310 315.640 6777.34
9530.87 47.460 314.890 6840.68
9623.23 47.340 313.310 6903.20
9716.8o 47.270 317.790 6966.67
9809.82 47.430 318.770 7029.69
9901.14 47.470 314.900 7091.46
9996.02 47.160 315.410 7155.79
10090.37 47.120 313.960 7219.97
10181.13 47.570 318.750 7281.48
lO277.01 47.580 316.460 7346.17
10369.31 47.290 315.260 7408.60
10460.52 47.210 313.100 7470.52
10557.36 48.560 319.140 7535.50
10648.93 50.350 321.370 7595.02
10745.59 50.480 318.200 7656.63
10838.19 50.220 318.230 7715.71
10932.50 50.330 316.180 7775.99
Vertical Local Coordinatee Global Coordinates
Depth Northings Faetinge Northinge Fastings
(ft) (ft) (ft) (ft) (ft)
6328.58 3834.07 N 3857.25 W 5956187.19 N 703278.84 E
6390.42 3864.93 N 3904.55 W 5956236.72 N 703230.15 E
6451.42 3934.67 N 3951.76 W 5956285.15 N 703181.59 E
6515.50 3986.99 N 3999.77 W 5956336.13 N 703132.16 E
6579.35 4036.56 N 4047.25 W 5956384.37 N 703083.33 E
6643.35 4083.87 N 4096.24 W 5956430.31 N 703033.05 E
6704.55 4131.35 N 4141.76 W 5956476.52 N 702986.25 E
6770.10 4183.78 N 4189.46 W 5956527.62 N 702937.12 E
6833.62 4233.58 N 4236.97 W 5956576.09 N 702888.25 E
6896.96 4282.58 N 4285.35 W 5956623.74 N 702838.55 E
6959.48 4329.89 N 4334.17 W 5956669.68 N 702788.44 E
7022.95 4378.96 N 4382.30 W 5956717.41 N 702738.97 E
7085.97 4430.02 N 4427.83 W 5956767.20 N 702692.06 E
7147.74 4479.07 N 4473.84 W 5956814.97 N 702644.72 E
7212.07 4528.52 N 4523.02 W 5956863.04 N 702594.19 E
7276.25 4577.15 N 4572.19 W 5956910.30 N 702543.70 E
7337.76 4625.44 N 4618.23 W 5956957.30 N 702496.35 E
7402.45 4677.70 N 4665.94 W 5957008.23 N 702447.22 E
7464.88 4726.48 N 4713.28 W 5957055.69 N 702398.55 E
7526.80 4773.16 N 4761.31 W 5957101.02 N 702349.26 E
7591.78 4824.92 N 4811.03 W 5957151.39 N 702298.13 E
7651.30 4878.42 N 4655.50 W 5957203.65 N 702252.21 E
7712.91 4935.29 N 4903.58 W 5957259.18 N 702202.57 E
7771.99 4988.46 N 4951.09 W 5957311.01 N 702153.61 E
7832.27 5041.68 N 5000.37 W 5957362.86 N 702102.89 E
Dogleg
Rate
(°/lOOff)
2.121
1.182
0.287
1.462
3.448
0.487
3.805
1.282
0.801
0.764
1.266
3.519
0.794
3.122
0.513
1.127
3.912
1.763
1.008
1.741
4.831
2.692
2.531
0.282
1.676
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
Comment
5438.35
5507.72
5576.25
5647.15
5715.75
5783.86
5849.60
5920.35
5989.14
6057.98
6125.96
6194.68
6262.93
6330.11
6399.85
6469.00
6535.67
6606.31
6674.27
6741.23
6812.97
6882.16
6956.29
7027.42
7099.85
RECEIVED
SEP 08
Continued...
DrillQuest 1.05.04e
I September, 20O0. ?: 11
.4-
Alaska Oil & Gas Cons. Commission
Anchorage
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: API-500292195801
Surveyed: 11 August, 2000
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azlm. Depth
(.)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastinga Northings Eastlngs
(ft) (~t) (~t) (~t) (~t)
11023.82 50.500 316.100 7834.18 7890.46 5092.42 N 5049.13 W 5957412.24 N 702052.75 E
11120.15 49.830 317.680 7895.89 7952.17 5146.42 N 5099.69 W 5957464.82 N 702000.73 E
11211.57 46.740 320.960 7956.73 8013.01 5198.12 N 5144.19 W 5957515.28 N 701954.82 E
11304.00 45.230 320.570 8020.95 8077.23 5249.60 N 5186.23 W 5957565.59 N 701911.38 E
11398.42 45.480 316.920 8087.31 8143.59 5300.09 N 5230.51 W 5957614.83 N 701865.72 E
11492.40 46.490 318.610 8152.61 8208.89 5350.13 N 5275.93 W 5957663.60 N 701818.94 E
11535.74 46.850 319.210 8182.35 8238.63 5373.89 N 5296.65 W 5957686.78 N 701797.57 E
11612.08 47.990 317.660 8234.01 8290.29 5415.94 N 5333.95 W 5957727.79 N 701759.13 E
11642.82 47.640 310.060 8254.67 8310.95 5431.70 N 5350.35 W 5957743.10 N 701742.31 E
11674.20 46.470 304.030 8276.06 8332.34 5445.54 N 5368.66 W 5957756.42 N 701723.62 E
'11704.81 44,720 299.500 8297,48 8353.76 5457.06 N 5387.23 W 5957767.42 N 701704.74 E
11735.75 45.580 297.130 8319.30 8375.58 5467.45 N 5406.54 W 5957777.29 N 701685.15 E
11793.74 45.130 296.720 8360.05 8416.33 5486.14 N 5443.33 W 5957794.95 N 701647.86 E
11889.75 43.610 297.950 8428.68 8464.96 5516.96 N 5502.97 W 5957824.11 N 701587.39 E
11983.76 42.820 297.060 8497.20 8553.48 5546.69 N 5550.06 W 5957852.26 N 701529.50 E
12076.74 44.160 295.850 8564.65 8620.93 5575,19 N 5617.35 W 5957879.17 N 701471.45 E
12170.88 43.220 297,160 8632.73 8689.01 5604.20 N 5675.55 W 5957906.57 N 701412.48 E
12362.02 40.180 298.620 8775.42 8831.70 5663.63 N ~ 5787.93 W 5957962.88 N 701298.50 E
12394.67 39.050 299.880 8800.58 8856.86 5673.79 N 5806.10 W 5957972.54 N 701280.06 E
12455.00 39.050 299.880 8847.43 8903.71 5692.73 N 5839.05 W 5957990.56 N 701246.60 E
Alaska State Plane 4
PBU_EOA DS 11
Dogleg Vertical
Rate Section
(°/100fi) (ft)
0.198 7170.20
1.439 7244.09
4.312 7312.04
1.662 7378.08
2.763 7445.03
1.681 7512.49
1.305 7543.91
2.113 7599.97
18.349 7622.72
14.548 7645.49
12.017 7666.83
6.100 7687.91
0.925 7727.29
1.819 7791.51
1.061 7853.15
1.697 7914.06
1.386 7975.98
1.670 8097.94
4.246 8118.04
0.000 8154.86
Comment
Last Survey Station
Projected Survey
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 27.213° (30-Aug-00)
The Dogleg Severity is in Degrees per lOOft.
Vertical Section is from Well Reference and calculated along an Azimuth of 314.273° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12455.00ft.,
RECEIVED
AlaSka UiI & GS~.S t,u:;.~. ~uu~ .........
Anchorage
Dr/I/Quest 1,05.04e
1 September, 2000.7:11 - 5 -
Sperry-Sun Drilling Services
Survey Report for 11-28A MWD
Your Ref: API.500292195801
Surveyed: 11 August, 2000
North Slope Alaska
The Bottom Hole Displacement is 8154.86ft., in the Direction of 314.273° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastlngs Comment
(~t) (~t) (~t) (fi)
5261,73 4093.66 1900.54 N 2132.91 W Tie-on Suwey to GCT survey
5272.00 4100.15 1905.66 N 2139.01 W Window Point
12394.67 8856.86 5673.79 N 5806.10 W Last Suwey Station
12455.00 8903.71 5692.73 N 5839.05 W Projected Suwey
Alaska State Plane 4
PBU_EOA DS 11
Survey tool program
From To
Measured Vertical Measured Verti¢=al
Depth Depth Depth Depth
(~t) (~t) (~t) (fi)
0.00 0.00 5296.15 4115.26
5296.15 4115.26 12455.00 8903.71
Survey Tool Description
AK-1 BP_HG - BP High Accuracy Gyro
MWD Magnetic
RE£E VED
Alaska
DrillQuest 1.05.04e
September, 2000 - 7:1 ! - 6 - Af~rjhO~.~-t,3e
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Dan Seamount
Commissioner
DATE: August 8, 2000
SUBJECT:
THRU: Blair Wondzell
P.I. Supervisor
FROM: Chuck Scheve~ ~ ~ ·
Petroleum Inspector
NON- CONFIDENTIAL
Blowout Preventer Test
Nabors 7ES
BPX
DS11-28A
200-095
WMRU
Operator Rep.: Dan Jackson
Contractor Rep.' Richard Larkin
Op..phone: 659-4144 Op. E-Mail:
Rig phone: Rig E-Mail:
Test Pressures
Rams: 250/3500
Annular: 250~3500
MISC. INSPECTIONS:
P/F
Choke: 250/3500
TEST DATA
FLOOR VALVES: MUD SYSTEM: Visual Alarm
P/F Quantity P/F Trip Tank P P
P Upper Kelly 1 P Pit Level Indicators P P
P Lower Kelly 1 P Flow Indicator P P
P - Ball Type 2 P Meth Gas Detector P P
Inside BOP 1 P H2S Gas Detector
Location Gen.: P Sign:
Housekeeping: P Rig cond:
PTD On Location P Hazard:
Standing Order: P '
BOP STACK:
Quantity Size P/F ACCUMULATOR SYSTEM:
Annular Preventer 1 13 5/8 P CHOKE MANIFOLD: Time/Psi P/F
Pipe. Rams 1 13 5/8 P Quantity P/F System Pressure 3000 P
Lower Pipe Rams No. Valves 14 P After Closure 1600 P
Blind Rams 1 13 5/8 P Man. Chokes 1 P 200 psi Attained 30 P
Choke Ln. Valves 1 4" P Hyd. Chokes 1 P Full Pressure 2:23 P
HCR Valves 2 4" P Blind Covers (All Stations): P
Kill Line Valves 1 4" P N2 Bottles (avg): 6 @ 2000
Check Valve N/A
P P ..
Test's Details
This rig is on its initial wen after a shut down for summer maintenance at which time a level 1 inspection of the BOP
equipment was performed. The initial function test of the equipment revealed the koomey lines to the choke and kill line
HCRs were crossed, these were repaired at this time. The pressure testing was then completed with no failures observed.
The lower pipe rams were not tested at this time due to the length of the cross over subs to the tubing hanger. They will be
tested as soon as the tubing is laid down.
The rig and location were very clean and orderly. The crews demonstrated good test procedures allowing the test to be
completed in the minimum number of steps.
Total Test Time: 4 Number of failures: 0
CC:
Attatchments: None
BOP Nabors 7E$ 8-8-00 CS.xls 8/15/00
ALASIIA OIL AND GAS
CONSERVATION CO~LMISSION
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dan Stone
Senior Drilling Engineer
Phillips Alaska Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit 11-28A
Phillips Alaska Inc.
Permit No: 200-095
Sur Loc: 744'NSL, 290'WEL, Sec. 28, T1 IN, R15E, UM
Btmhole Loc. 1157'NSL, 810'WEL, Sec. 20, T1 IN, R15E, UM
Dear Mr. Stone:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
~Daniel T Seamoi~nt, Jr.
Commissioner
BY ORDER OF THE COMMISSION
DATED this ~ ~6. day of June, 2000
dlf/Enclosures
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASK~ iL AND GAS CONSERVATION COM~,,SSION --
PERMIT TO DRILL
20 AAC 25.005
ii
la. Type of work [] Ddll [] Reddll 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator /-~,~:::) :~,~.~.. 5. Datum Elevation (DF or KB) 10. Field and Pool
ARC_~..~. Z~.i_.~, ~ -~/"/~' /5~ Plan RKB = 59.5' Prudhoe Bay Field / Prudhoe
3. Address 6. Properly Designation ~,~/ Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028321
4. Location of well at surface 7. Unit or Property Name I11. Type Bond (See 2O AAC 25.025)
744' NSL, 290' WEL, SEC. 28, T11N, R15E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
1061' NSL, 716' WEL, SEC. 20, T11N, R15E, UM 11-28A Number U-630610
At total depth 9. Approximate spud date
1157' NSL, 810' WEL, SEC. 20, T11N, R15E, UM 07/10/00 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028322, 810' MDI No Close Approach 2560 12354' MD/8823' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 5300' MD Maximum Hole Angle 48.1 o Maximum surface 2540 psig, At total depth (TVD) 8800' / 3420 psig
18. Casing Program Specifications Setting Depth
Size Top B0ttqm quantity of Cement
Hole Casinq Weiqht Grade Couplinq Lenqth MD TVD MD TVD (include staqe data)
8-1/2" 7" 26# L-80 BTC-M 6395' 5150' 4003' 11545' 8283' 159 sx Class 'G'
6-1/8" 4-1/2" 12.6# L-80 IBT-M 959' 11395' 8183' 12354' 8823' 140 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 12475 feet Plugs (measured) A~a$~[8 0{~ & G~$ Cor~$. L, offlffllSSl0~
true vertical 8927 feet
Effective depth: measured 12427 feet Junk (measured) Packer fish, top at 11308' (05/00)
true vertical 8891 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 80' 20" 2275 # Poleset 113' 113'
Surface 4291' 13-3/8" 2500 sx AS III, 600 sx 'G', 150 sx AS II 4327' 3508'
Intermediate
Production 11568' 9-5/8" 500 sx SS II 11602' 8303'
Liner 1186' 7" 313 sx SS II 11284'- 12470' 8083' - 8923'
Tieback Sleeve 2011' 7" 280 sx Class 'G' 5423' - 7434' 4198' - 5523'
Tieback Sleeve 3856' 7" 577 sx Class 'G' 7428' - 11284' 5519' - 8083'
Perforation depth: measured 12270'-12300',ORIGINAL
true vertical 8775' - 8797', 8811' - 8828'
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Allen Sherritt, 564-5204 Scott, Kolstad, 564-5347 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true un,correct to the best of my knowledge
Signed Dan Stone ~.~.~,,~.,..,, ~r,-7, ~ Title Senior Drilling Engineer Date
Permit Number ~,~ APl Number App~,,~/~ I See c°ver 'eEer
~ ::2--~-~C~ ~' ~ 50- 029-21958-01 for other requirements
"~onditions of Approval: Samples Required I-I Yes .~No Mud Log Re~'uir~d' ~/ [] Yes '~["No
Hydrogen Sulfide Measures ,~Yes [] No Directional Survey Required ,~Yes [] No
Required WOrking Pressure for BOPE [] 2K; [] 3K; [] 4K; I-15K; [] 10K; [] 15K
Other: :~0(~;~'~'~ ~"~~
ORIGINAL SIGNED BY by order of ~,/~,(~;:/~
Approved By .q T_-.'_'!.".r £~.-t..m.m :nt Commissioner the commission Date
Form 10-401 Rev. 12-01-85
t In Triplicate
11-28A Permit to Drill
I Well Name: 111-28A
Sidetrack Plan Summary
I Type of Redrill (producer or injector): I Producer
Surface Location:
Target Location:
Bottom Hole Location-
744' FSL 290' FEL S28 T11N R15E Umiat
X: 707,240' Y: 5,952,461'
1,061' FSL716' FEL S20T11N R15E Umiat
X: 701,370' Y:5,957,900'
1,157' FSL810' FEL S20T11N R15E Umiat
X: 701,274' Y: 5,957,994'
I AFE Number: 14J8038 I
I Estimated Start Date: 17/10/00 I
I Rig: I Nabors 9ES
I Operating days to complete: 116.5
I MD: 112,354'1 I TVD: 18823' I I BF/MSL: 130.2' I I RKB: 159.5'
I Well Design (conventional, slimhole, etc.): I Conventional Sidetrack
I Objective: I Twin existing well bore to a new BHL-300' North East. A Sidetrack around
I I
fish is required to bring well back on production
Mud Program:
Milling/Cutting Casing Mud Properties: LSND
Density (ppg) I Funnel Vis I Yield Point
10.0 I 45-55 I 25-35
I Whipstock Window in 9-5/8"
I pHI HTHP FL
9 - 9.5 <10
Intermediate Mud Properties: LSND I 8-1/2" hole section
From sidetrack depth to 11,545' MD (8283' TVD). TD Top of Sag River.
Density(ppg) IFunnelVis I YieldPointI PV I tau0
10.0to10.2 I 45-55 23-28 10-17 3-7
pH
9-9.5
APl FL
<lOto 6
Production Mud Properties: Low Density QUICKDRILn
Density (ppg) I Funnel vis LSRV PV
8.3 - 8.5 I 40 - 50 < 12,000 cP 5 - 8
6 1/8" hole section
YP
Ca++ J APIFI I PH
<100 <10 9.0-9.5
17 - 22
Directional:
KOP: I 5300' MD - 8 ¥2"
I
hole.
Maximum Hole Angle:
Close Approach Well:
48.1° through tangent interval
None
11-28A Permit to Drill
Logging Program:
Intermediate Section
Production Hole
IDrilling: MWD / GR
Open Hole: None
Cased Hole: None
Drilling: MWD / GR / Resistivity
Open Hole: None
Formation Markers:
Formation Tops MD TVDss Comments
Base Permafrost Not Penetrated
SV3 / T5 Kick-Off Point in T5
Kick-Off Point 5,300' 4,060'
SV1 / T3 +_ 5,625' 4,292'
UG4 / K15-C1 _+ 6,415' 4,805'
UG1 / UgS _+ 7,700' 5,665'
TUZC _ 8,285' 6,020'
WS1 / West Sak _+ 8,880' 6,430'
CM-1 / K5 11,833' 7749'
THRZ 11,200' 7,994'
BHRZ 11,538' 8,220'
Sag River 11,545' 8,225'
Shublik 11,583' 8,250'
Top Sadlerochit / Z4 11,665' 8,305'
TZ3 11,853' 8,430'
TZ2 12,175' 8,645' Est. pore press. 3420 psi (7.6ppg EMW)
TD / BSAD 12,354' 8,765'
Casin!/Tubinq Proqram:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MD/TVD
8-1/2" 7" 26# L-80 BTC-M 6395' 5150'/4003' 11,545'/8283'
6-1/8" 4-1/2" 12.6# L-80 IBT-M 959' 11,395'/8183' 12,354'/8823'
Tubing 3-1/2" 12.6# L-80 IBT-Mod 11,245' Surface 11,245'/8081'
11-28A Permit to Drill
Cement Calculations:
Liner Size 17" Intermediate I
Basis: Lead: None
Lead TOC: N/A
Tail: Based on 80' shoe track volume and 1000' of open hole with 30% excess.
Tail TOC: At -10,545' MD (-7,600' TVD).
I Total Cement Volume: I Lead I None
I Tail I 33 bbl/185.3 ft~ / 159 sks of Dowell Class 'G' at 15.8 ppg and
1
1.17 cf/sk.
Liner Size 1 4 ¥2" Production I
Basis: Tail: Based on 809' of open hole with 50% excess, 150' of 7" x 4.5" liner lap, 200' of 7" x 4" drill
pipe annulus volume, and 80' of 4-1/2" shoe joint.
Tail TOC: At top of liner -11,395' MD (8,186' TVD).
Total Cement Volume: I Tail I 29 bbl / 163 ft~ / 140 sks of Dowell Class 'G' at 15.8 ppg and 1.17
I
I
cf/sk.
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and
annular preventer will be installed and is capable of handling maximum potential surface pressures.
Based upon calculations below, BOP equipment will be tested to 3500 psi.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Maximum anticipated BHP: 3420 psi@ 8800' TVDss - Zone 1
Maximum surface pressure: 2540 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3500 psi
8.6 ppg Seawater/6.8 ppg Diesel
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· DS 11 is designated as an H2S Pad. DS 11 H2S max reading 2/99 402 ppm. Review H2S
procedures in the pre spud meeting. H2S precautions should be followed at all times.
The last H2S reading from 11-28 was 6 ppm (measured in September 1999.) Standard
Operating Procedures for H2S precautions should be followed at all times.
DRILLING CLOSE APPROACH:
· All wells pass close approach guidelines.
INTERMEDIATE SECTION:
Cretaceous over pressure is possible around 4,510' TVD. Appropriate mud weights will be used
prior to entering this interval.
The 11-28A well path will drill approximately 285' of HRZ shale.
The kick tolerance for the 8-1/2" open hole section would be 163 bbls assuming an influx from
the Sag River interval at -11,545' MD. This is a worst case scenario based on a 7.8 ppg pore
pressure gradient, a fracture gradient of 12.0 ppg at the surface casing shoe, and 10.0 PEg ~ud
in the hole. F""~ ;~'=~ .... ~ ~ .... ~,~ ~,~ ~ .... " ~
J JN 21 2000
11-28A Permit to Drill
PRODUCTION SECTION:
· There are no planned fault crossings in the reservoir section. Lost circulation has been minor on
DS 11 on past wells in the production interval.
· Gas cut mud is possible in the Shublik and Sadlerochit and will be controlled with appropriate
mud weights.
· The kick tolerance for the 7' shoe would be an infinite influx (annular volume) assuming an influx
at section TD of 12,354' MD. This is a worst case scenario based on a 7.8 ppg pore pressure, a
minimum fracture gradient of 9.5 ppg at the 7" casing shoe, and 8.3 ppg mud in the hole.
Disposal:
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject
at DS-04. Any metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for
injection. Haul all Class I wastes to Pad 3 for disposal.
SUMMARY SIDETRACK PROCEDURES
Pre-Ri_ Work:
.
* Notify the field AOGCC representative with intent to plug and abandon *
,
RIH with CTU and perform a cement P&A using 15.8 ppg class 'G' cement with adequate cement
volume to fill the 7" liner from top of fish @ 11,308' MD a minimum of 500' above the top of fish at
10,808' MD. Estimated minimum cement volume needed is 19 barrels. Tag top of cement to verify
depth. NOTE: The perforations will be isolated by the existing packer/tubing tail, a fully
cemented 7" tie-back liner from 11,284' MD to 5423' MD, the -500' of cement on top of
fish/existing packer and a bridge plug in the 9 5/8" casing, (see proposed completion.)
Displace the well to clean sea water. Continue to circulate until clean sea water returns to surface.
Freeze protect top 2200' MD with diesel.
Test the integrity of the cement plug and 9-5/8" casing and 7" liner by to 3000 psi for 30 minutes.
Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes.
Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well.
6. Remove the well house and flowlines. If necessary, level the pad. Please provide total well
preparation cost on the handover form.
Ri.q Operations:
1. MIRU Nabors 9ES.
2. Circulate out freeze protection and displace well to sea water. Set TWC.
3. Nipple down tree. Nipple uP and test BOPE.
4. Pull and lay down 3 Y2" tubing freeze protect string at -2,340' MD.
11-28A Permit to Drill
5. RIH picking up window mills for a gauge run to -50 below kick off depth of -5,300' MD prior to RIH
with the whipstock. RU E-line. Set BP on E-line at -5,320' MD (set as needed to avoid cutting casing
collar). Pressure test the 9 5/8" casing to 3000 psi.
6. RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock as desired and set
on BP. Mill window in 9-5/8" casing at -5,300' MD. POOH.
7. Kick-off and drill 8 1/2" hole from 5,300' to -11,545' at the top of the Sag River formation. Run
MWD/GR LWD. No other logs are planned for this interval.
8. Run and cement a 7" 26# L-80 intermediate drilling liner.
9. Make up and RIH with a 6 1/8" directional assembly to the landing collar.
10. Test the 9-5/8" casing and 7" liner from the landing collar to surface to 3000 psi for 30 minutes.
11. Drill out 6 1/8" hole from 11,545' to TD of 12,354' in Zone 1. Run MWD/GR/Res real time LWD.
12. Run and cement a 4 1/2", 12.6# L-80 IBT-Mod solid production liner throughout the 6-1/8" well bore.
13. Displace well to clean sea water above liner top. POOH LD DP. After the cement has gained
sufficient compressive strength, pressure test the 4 1/2", 7", and 9-5/8" casing from the 4 1/2" landing
collar to surface to 3000 psi for 30 minutes.
14. Run 3 1/2", 9.2# L-80 EUE 8rd completion tying into the 4 1/2" liner top.
15. Set packer @ -11,245' MD and test the tubing to 3500 psi and annulus to 3000 psi for 30 minutes.
16. Set BPV, nipple down the BOPE. Nipple up and test the tree to 5000 psi.
17. Freeze protect the well to -2200' and secure well.
18. Rig down and move off.
Estimated Pre-rig Start Date:
Estimated Spud Date:
Allen Sherritt
Operations Drilling Engineer
564-5204
06/28/00
07/10/00
11-28 RWO Existing Condition
TREE: 4-1116 ' - 5M L-80
GL
27.8'
WEU.HEAD: ~3 s/8-- sM c~w 64
! RKB = 57.1'
I
: ~ ~ 3-1/2' 9.3# L-80, EUE 8rd- Mod. Freeze
=// Protect Tubing String I '1
13-3/8", 68 #/ft, L-80 / K-55
'1
dUN 2 1 2000
Second 7" Liner-Tieback Top ~
54Z3'
:;':~:': '::;:::: A~ch0rage
!:::::~: .. :: ::: -
, .. ::
.
iii:':
Original 7" Liner-Tieback Top :.,;!:! ....,
::7:..~
·.:
.:.
:
'.':1
~ '.:
,
i '
':' lop of fish at 11,308' MD
':: I ~ i:'! ~-112' 'XN' landing Nipplo with 2.813" $oal boro and 2.75' No-Go
:~' '!' ~: Gustom Tubing Ovorshot to swallow $-112' tubing stub of oxisting ¢omplotion.
:":i []
~-5/8~, 47 #Iff, [.-80, BTG .~ :i ~ ~ lubing tail will romain at 11,400' MD.
I I
·
1
?", 2O #/lt, t_-aO, BlC ~ ~
Date Rev By Comments ~RUDHO£ B~¥ UNII
6/16/00 OAS Existing Condition after workover operations.
WELL: 11-28
APl NO: 50-029-21958
Shared Services Drilling
TREE: 4-1/16' -5M L-80
WELLHEAD: CIW Gen 4, 13 3/8' - 5M
11-28A Proposed Completion
7"26ff LinerTopat i +/-5150' I
BAKER 9 5/8" Whipstock @ ~5300' MD
Bridge Plug @ -5320' MD
I ·
Second 7" Liner-Tieback Top 15423' MD
Original 7" Liner-Tieback Top I 7428' MD I
500' Cement Plug set at +/-10,808' MD
7" Liner Top ! 11,272' MDI
9-5/8", 47 #fit, L-80, BTC I I
Top Perforation at +/-10,818' MD
Plug Back Depth I 12,348' MDI
7", 29 #/ft, L-80, BTC I 12,470' MD I
GL Elevation = 27.8'
Nabors 7ES RKB = 57.1'
3-1/2' 'X' Landing Nipple with 2.813" seal bore.
I-1/2" x 1-1/2' Gas Lift Mandrels with handling pups installed.
GAS UFT MANDRELS
MD Size Valve Type
4,700'
7,800'
10,000'
11,160'
1-1/2"
1-1/2'
1-1/2'
1-1/2"
RP Shear
DV
DV
DV
3-1/2" 9.3# L-80, EUE 8rd-Mod Tubing
Window Milled from Whipstock
Top of Window at +/- 5300' MD
JUN 21 2000
Date
6/16/00
7" x 4 1/2" Baker'S' Production Packer ".
@ -11,245' MD
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" WLE Guide spaced-out into liner top.
4-1/2" Liner top packer and hanger @
-11,395'MD.
7", 26#, L-80, BTC
I +/-11,545' MD I
4-1/2" 12.6 #Iff, L-80, BTCM
I +/-12,354' MD I
PRUDHOE BAY UNIT
WELL: 11-28A
APl #: 50-029-21958-01
Revised_bY_
JAS
Cgm._m..e_n_ts
_Prop__o~_ed_ cg. mp.!e_t_ipn .....
Shared Services Drilling
11-28A WD02
·
I DrillQuesf
4OOO
5OO0
ST Exit @ 12.000°/100ft, 60.000° TF' 5300.01ft MD, 4118.39ft TVD
Dir @ 6.000°/10Oft: 5340.00ft MD, 4142.96ft TVD
End Dir: 5428.18ft MD, 4198.74ft TVD
JUN 2! 2OOO
6OOO
.--
~ 7000
8000
o
o
o
c° 9000
.--
I I I
3000 5000 6000
Scale: linch = 1000ft Vertical Section
8702. 78
5598.80 N, 5718.19 W
7" Liner K5 - 7806 78 7'VD
11545.52 MD
~2.1~2~.7.8 ."[VD. ..... THRZ- 8087.78 TVD
/'~BIJRZ - 8277 78 TVD
. .
.......Z3 - 8487.78 TVD
4 1/2" Liner
12354.36 MD
8822.78 TVD
I I I
7000 8000 9000
Section Azimuth: 315.922° (True North)
~s~umm~ Single Well Target Data for 11-28A WPS
units: ft
Coordinate
Target Point TVDrkb TVDss Northlnga Eestlngs ASP X ASP X Target
IN arno Type Shape
[ll-28AWp0! EntryPoint8702.78 8645.00 5598.80N 5718.19W 5957900.00N 701370.00EPoint
Proposal Data for 11-28A Wp02
Vertical Origin: Well
Horizontal Origin: Well
Measurement Units:
North Reference: True North
Dogleg severity: Degrees per 10Oft
Vertical Section Azimuth: 315.922°
Vertical Section Description: Well
Vertical Section Origin: 0.00 N,0.00 E
Measured Incl. Azim. Vertical Northings Eastings VorticalDogleg
Depth Depth Section Rate
5300.00 50.858310.005 4118.39 1918.86 N 2154.75 W 2877.42
5340.00 53.375315.185 4142.96 1940.23 N 2177.96 W 2908.92 12,000
5428.18 48.117315,947 4198.74 1988.96 N 2225.76 W 2977.18 6.000
12174.6248.117315.947 8702.78 5598.80 N 5718.19W 7999.93 0.000
12354,3648.117315.947 8822.78 5694.98 N 5811.24 W 8133.75 0.000
Current Well Properties
Welt: 11-28A WPS
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure Reference :
Ref. Geographical Coordinates:
RKB Elevation:
North Reference:
Units:
5952460.80 N, 707240.21 E
2942.06 N, 267.75 W
70° 16' 24.7802" N, 148° 19' 24.8335" W
57.78ft above Mean Sea Level
57.78ft above Structure Reference
True North
Feet
5250 -
4500 -
3750-
3000 -
CO 2250-
._
I,,-
Scale: linch = 750ft
-6000 -5250
I I
4 1/2' Liner
8822.78
11-28A WpOl
8702. 78
5598.80 N, 5718.19 W
7' Liner
11545.52 MD
8282.78 TVD
Shared Services Drilling
11-28A Wn 02
a
Eastings
-4500 -3750 -3000
I I I
I
-6000
Scale: linch = 750ft
.._~ ~1~ End Dir' 5428.18ft MD,
{ ,
-5 -3750
Eastings
JUN 21 2000
Alaska 0~I & Gas Co~s. Commission
Anch0ra§e
I
-3000
I DrillQuesf
-2250
I
I
525O
45OO
1::
o
3750 Z
3O0O
-2250
Referenceis True No~h
2250
Measurement Units: CoordlnateSinglen Well Target Data for 11-28A WPS
Target Point TVDrkb TVDes Northlngs Eastlnge ASPX ASP X Target
Name Type Shape
]-28AWpOI EnttyPoin!8702.78 8645.00 5598.80N 5718.19W 5957900.00N 701370.00EPoint
Proposal Data for 11-28A Wp02
Vertical Odgin: Well
Horizontal Origin: Well
Measurement Units: ff
North Reference:True North
Dogleg severity: Degrees per 10Oft
Vertical Section Azimuth: 315.S22°
: Vertical Section Description: Well
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings VerticalDoglag
Depth Depth Section Rata
5300.00 50.858310.005 4118.39 1918.86 N 2154.75 W 2877.42
5340.00 53.375315.185 4142.96 1940.23 N 2177.96 W 2908.92 12.000
5428.18 48.117315.947 4198.74 1988.96 N 2225.76 W 2977.18 6.000
12174.6248.117315.947 8702.78 5598.80 N 5718.19W 7999.93 0.000
12354.3648.117315.947 8822.78 5694.98 N 5811.24 W 8133.75 0.000
Current Well Properties
Well: 11-28A WPS
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure Reference :
Ref. Geographical Coordinates:
RKB Elevation:
North Reference:
Units:
5952460.80 N, 707240.21E
2942.06 N, 267.75W
70°16'24.7802" N, 148°19'24.8335"W
57.78ft above Mean Sea Level
57.78ft above Structure Reference
True North
Feet
JUN 2 1 2000
Sperry-Sun Drilling Services
Proposal Report for 11-28A WPS- 11-28A Wp02
Revised: 20 June, 2000
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
5300.00 50.858 310.005 4060.61
5340.00 53.375 315.185 4085.18
5400.00 49.796 315.691 4122.45
5428.18 48.117 315.947 4140.96
5500.00 48.117 315.947 4188.90
5600.00 48.117 315.947 4255.67
5700.00 48.117 315.947 4322.43
5800.00 48.117 315.947 4389.19
5900.00 48.117 315.947 4455.95
6000.00 48.117 315.947 4522.71
6100.00 48.117 315.947 4589.47
6200.00 48.117 315.947 4656.24
6300.00 48.117 315.947 4723.00
6400.00 48.117 315.947 4789.76
6500.00 48.117 315.947 4856.52
6600.00 48.117 315.947 4923.28
6700.00 48.117 315.947 4990.05
6800.00 48.117 315.947 5056.81
6900.00 48.117 315.947 5123.57
7000.00 48.117 315.947 5190.33
7100.00 48.117 315.947 5257.09
7200.00 48.117 315.947 5323.85
7300.00 48.117 315.947 5390.62
7400.00 48.117 315.947 5457.38
7500.00 48.117 315.947 5524.14
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
4118.39 1918.86 N 2154.75 W
4142.96 1940.23 N 2177.96W
4180.23 1973.72 N 2210.95W
4198.74 1988.96 N 222!
4246.68 2027.39 N
4313.45 2080.90 N
4380.21 2134.40
4446.97 2187.91 ~4W
4513.73 W
4580.49 .93 2521.77W
4647.25 2573.54W
4714.02 2625.31W
4780.78 .N 2677.07W
4847.54 2728.84W
49 2780.61W
2615.97 N 2832.38W
2669.48 N 2884.14W
511 2722.98 N 2935.91W
5181.35 2776.49 N 2987.68W
5248.11 2830.00 N 3039.44W
5314.87 2883.51N 3091.21W
5381.63 2937.01 N 3142.98W
5448.40 2990.52 N 3194.74W
5515.16 3044.03 N 3246.51W
5581.92 3097.54 N 3298.28W
5954372.88 N 704975.75 E
5954387.71 N 704960.52 E
N 7O4922.30 E
5954477.16 N 704869.08 E
5954529.22 N 704815.85 E
5954581.28 N 704762.63 E
5954633.34 N 704709.41E
5954685.41 N 704656.19 E
5954737.47 N 704602.97 E
5954789.53 N 704549.75 E
5954841,59 N 704496.53 E
5954893.65 N 704443.31E
5954945.71N 704390.09 E
5954997.77 N 704336.87 E
5955049.84 N 704283.65 E
5955101.90 N 704230.42 E
5955153.96 N 704177.20 E
5955206.02 N 704123.98 E
5955258.08 N 704070.76 E
5955310.14 N 704017.54 E
5955362.20 N 703964,32 E
5955414.27 N 703911.10 E
5955466,33 N 703857.88 E
Dogleg
Rate
(o/looft)
12.000
6.000
6.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0,000
0.000
0.000
0.000
0.000
0,000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
2877.42
2908.92
2955.92
2977.18
3030.65
3105.10
3179.55
3254.00
3328.45
3402.90
3477.35
3551.80
3626.25
3700.70
3775.15
3849.60
3924.05
3998.50
4072.95
4147.40
4221.85
4296.30
4370.75
4445.20
4519.65
Comment
ST Exit @ 12.000°/100ft.
60.000° TF: 5300.01ft MD,
4118.39ft TVD
Beqin Dir @ 6.000°/100ft:
534'0.00ft MD, 4142.96ft TVD
End Dir: 5428.18ft MD,
4198.74ft TVD
Continued...
20 June, 2000 - 10:05 - 2 - Dr/I/Quest 1.05.04c
JUN 21 nnn
Alaska Oi.'I & Gas Cons. Co,'~,~.ission
Anchorsge
Sperry-Sun Drilling Services
Proposal Report for 11-28A WPS- 11-28A Wp02
Revised: 20 June, 2000
North Slope Alaska
Measured
Depth Incl. Azim.
(fi)
7600.00 48.117 315.947
7700.00 48.117 315.947
7800.00 48.117 315.947
7900.00 48.117 315.947
8000.00 48.117 315.947
8100.00 48.117 315.947
8200.00 48.117 315.947
8300.00 48.117 315.947
8400.00 48.117 315.947
8500.00 48.117 315.947
8600.00 48.117 315.947
8700.00 48.117 315.947
8800.00 48.117 315.947
8900.00 48.117 315.947
9000.00 48.117 315.947
9100.00 48.117 315.947
9200.00 48.117 315.947
9300.00 48.117 315.947
9400.00 48.117 315.947
9500.00 48.117 315.947
9600.00 48.117 315.947
9700.00 48.117 315.947
9800.00 48.117 315.947
9900.00 48.117 315.947
10000.00 48.117 315.947
Sub-Sea
Depth
(ft)
5590.90
5657.66
5724.43
5791.19
5857.95
5924.71
5991.47
6058.23
6125.00
6191.76
6258.52
6325.28
6392.04
6458.80
6525.57
6592.33
6659.09
6725.85
6792.61
6859.38
6926.14
6992.90
7059.66
7126.42
7193.18
Ve~ical Local Coordinates Global
Depth Nothings Eastings No~hin¢ Is
(~) (~) (~) (~)
5648.68 3151.04 N 3350.05W 703804.66 E
5715.44 3204.55 N 3401.81W 703751.44 E
5782.21 3258.06 N 3453.58W ;1N 703698.21E
5848.97 3311.56 N 3505.35W ~N 703644.99 E
5915.73 3365.07 N 3557.11W 5955726.63 N 703591.77 E
5982.49 3418.58 N 3608. N 703538.55 E
6049.25 3472.09 N N 703485.33 E
6116.01 3525.59 N 5955882.82 N 703432.11 E
6182.78 3579.10 N 5955934.88 N 703378.89 E
6249.54 3632.61 5955986.94 N 703325.67 E
6316.30 i3867.72W 5956039.00N 703272.45 E
6383.06 37~9..62 3919.48W 5956091.06N 703219.23 E
6449.82 ~'~-13N"~,,,~ 3971.25W 5956143.13 N 703166.00 E
6516.58 '~46~ 4023.02W 5956195.19 N 703112.78 E
6583.35 a111~1~3,1~15 N 4074.78W 5956247.25 N 703059.56 E
6650.11~l~t[j~3.65~r~l~ N 4126.55W 5956299.31N 703006.34 E
67~7~ '~m'4007.16 N 4178.32W 5956351.37 N 702953.12 E
,~"37111~.~ 4060.67 N 4230.09W 5956403.43 N 702899.90 E
'~.3g~t 4114.18 N 4281.85W 5956455.49 N 702846.68 E
69'11~ 4167.68 N 4333.62W 5956507.56 N 702793.46 E
6983.92 4221.19 N 4385.39W 5956559.62 N 702740.24 E
7050.68 4274.70 N 4437.15W 5956611.68 N 702687.02 E
7117.44 4328.20 N 4488.92W 5956663.74 N 702633.80 E
7184.20 4381.71N 4540.69W 5956715.80 N 702580.57 E
7250.96 4435.22 N 4592.45W 5956767.86 N 702527.35 E
Dogleg
Rate
(°/100ft)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
PBU_EOA DS 11
Ve~ical
Section
(fi)
4594.10
4668.55
4743.01
4817.46
4891.91
4966.36
5040.81
5115.26
5189.71
5264.16
5338.61
5413.06
5487.51
5561.96
5636.41
5710.86
5785.31
5859.76
5934.21
6008.66
6083.11
6157.56
6232.01
6306.46
6380.91
Comment
Continued...
20 June, 2000 - 10:o5 - 3 - DrillQuest 1.05.04c
Sperry-Sun Drilling Services
Proposal Report for 11-28A WPS- 11-28A Wp02
Revised: 20 June, 2000
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(~) (~)
10100.00 48.117 315.947 7259.95
10200.00 48.117 315.947 7326.71
10300.00 48.117 315.947 7393.47
10400.00 48.117 315.947 7460.23
10500.00 48.117 315.947 7526.99
10600.00 48.117 315.947 7593.76
10700.00 48.117 315.947 7660.52
10800.00 48.117 315.947 7727.28
10832.53 48.117 315.947 7749.00
10900.00 48.117 315.947 7794.04
11000.00 48.117 315.947 7860.80
11100.00 48.117 315.947 7927.56
11200.00 48.117 315.947 7994.33
11253.43 48.117 315.947 8030.00
11300.00 48.117 315.947 8061.09
11400.00 48.117 315.947 8127.85
11500.00 48.117 315.947 8194.61
11538.03 48.117 315.947 8220.00
11545.52 48.117 315.947 8225.00
11582.96 48.117 315.947 8250.00
11600.00 48.117 315.947 8261.37
11665.35 48.117 315.947 8305.00
11700.00 48.117 315.947 8328.14
11800.00 48.117 315.947 8394.90
11852.58 48.117 315.947 8430.00
Vertical Local Coordinates Global
Depth Northings Eastings Northin¢ Iings
(ft) (ft) (ft) (ft)
7317.73 4488.73 N 4644.22 W 702474.13 E
7384.49 4542.23 N 4695.99 W 702420.91 E
7451.25 4595.74 N 4747.76 W N 702367.69 E
7518.01 4649.25 N 4799.52 W I1 N 702314.47 E
7584.77 4702.76 N 4851.29 W 5957028.17 N 702261.25 E
7651.54 4756.26 N 4903. N 702208.03 E
7718.30 4809.77 N 702154.81 E
7785.06 4863.28 N 5957184.35 N 702101.59 E
7806.78 4880.69 N 5957201.29 N 702084.27 E
7851.82 4916.79 5957236.42 N 702048.36 E
7918.58 10.12 W 5957288.48 N 701995.14 E
7985.34 5~_~.80 5161.89 W 5957340.54 N 701941.92 E
8052.11 ~6.(~31 N 5213.66 W 5957392.60 N 701888.70 E
8087.78 ~9~i~1 5241.32 W 5957420.42 N 701860.26 E
8185.63~'~ J~84.32 N 5317.19 W 5957496.72 N 701782.26 E
82_,~i~g~k '~5237.83 N 5368.96 W 5957548.78 N 701729.04 E
,aJFF-/TR~ ~ 5258.18 N 5388.65 W 5957568.58 N 701708.80 E
5262.18 N 5392.52 W 5957572.48 N 701704.81 E
8307~8 5282.22 N 5411.91 W 5957591.98 N 701684.88 E
8319.15 5291.34 N 5420.73 W 5957600.85 N 701675.82 E
8362.78 5326.30 N 5454.55 W 5957634.87 N 701641.04 E
8385.92 5344.84 N 5472.49 W 5957652.91 N 701622.60 E
8452.68 5398.35 N 5524.26 W 5957704.97 N 701569.38 E
8487.78 5426.49 N 5551.48 W 5957732.34 N 701541.39 E
Dogleg
Rate
(Vl00fl)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(~)
6455.36
6529.81
6604.26
6678.72
6753.17
6827.62
6902.07
6976.52
7000.74
7050.97
7125.42
7199.87
7274.32
7314.10
7348.77
7423.22
7497.67
7525.98
7531.56
7559.44
7572.12
7620.77
7646.57
7721.02
7760.17
Comment
K5
THRZ
BHRZ
7" Liner
LCU/TSGR
SHU
Z4
Z3
Continued...
20 June, 2000 - 10:05 - 4 - DrillQuest 1.05.04c
2 1 2000
Oil & Gas Cons. Commission
A~or~go
Sperry-Sun Drilling Services
Proposal Report for 11-28A WPS- 11-28A Wp02
Revised: 20 June, 2000
North Slope Alaska
Measured
Depth
Ct)
11900.00
12000.00
12100.00
12174.62
Sub-Sea Vertical Local Coordinates
Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft)
48.117 315.947 8461.66 8519.44 5451.86 N 5576.03 W
48.117 315.947 8528.42 8586.20 5505.37 N 5627.79 W
48.117 315.947 8595.18 8652.96 5558.87 N 5679.56 W
48.117 315.947 8645.00 8702.78 5598.80 N 5718.19 W
12200.00 48.117 315.947 8661.94 8719.72 5612.38 N
12300.00 48.117 315.947 8728.71 8786.49 5665.89 N
12354.36 48.117 315.947 8765.00 8822.78 5694.98 N
All data is in feet unless otherwise stated. Directions and
Vertical depths are relative to Well. Northings and Eastings a~
5731.3:
Global
(ft)
tings
7o1516.16 E
701462.93 E
5 N 701409.71E
)0 N 701370.00E
S ve to True North.
:ive to Well.
N
N
5957993.58 N
7O1356.49 E
701303.27 E
701274.34 E
Dogleg
Rate
(°/lOOft)
0.000
0.000
0.000
0.000
0.000
o.ooo
o.0oo
Alaska State Plane 4
PBU_EOA DS 11
Vertical
Section
(ft)
7795.47
7869.92
7944.37
7999.93
8018.82
8093.27
8133.75
Comment
Z2A
rget .- 1.1-28A Wp01,
o~og~ca~
Total Depth: 12354.36ft MD,
8822.78ft TVD
4 1/2" Liner
BSAD/KAVIK
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated
of 315.922° (True).
Based upon Minimum Curvature type calculations, easured Depth of 12354.36ft.,
The Bottom Hole Displacement is 8136.54ft., in the Direction of 314.421° (True).
Continued...
20 June, 2000 - 10:05 - 5- DrillQuest 1.05.04c
I DATE ['CHECK NO.
Ioo~42~
'169425 (, ( I°~'~6'°° I ]
VENDOR AL ~KA~TAT 10
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
~2&00 CKO~2600A 100. 00 100. 00
H~NDL])NO INST: s/h tereie x 462[
E AT'rACHED CHECK 1 ~1PAYllil~iT ] IlF. idS [[[ii[ ABOVE BI[Ill-'Ill ] 1 ~i~ ~ 1 ~ ~
'FIRST NATIO~'~.:BAN K:::OF ASH 'EAND
i.:"::'i::i: ..": ::!: :~i~i~UATEi.~ :::::~ii?':.:' :i:':'.'..
'!..:::':.:i ::...::' N~jON~.:CITY:B/~K '::.'.':.:. :~.'i i:
· :::.:::.::..::. :i 'QEEVB~D 0~i0 :.:':' i' .:'.' :'
":!ii::':56-389.':'.": .... : ':""
: ...... .: --.-..::
4'12
CONSOEiD~ED COMM~BcI.~[
"'],Eqha5"" ':Ohiall3P, qs': O0G
1-28A Ddlling Permit
Subject: 11-28A Drilling Permit
Date: Wed, 28 Jun 2000 12:45:07 -0500
From: "Sherritt, Allen (ARCO)" <SherriJ~,@BP.com>
To: '"Tom Maunder'" <Tom_Maunder@admin.state.ak. us>
Tom,
The estimated spud date for 11-28A has moved from 7-10-00 to 7-7-00. Things
are progressing a little faster then expected on N-10A and with the long
weekend coming up, I wanted to make sure you were aware of the time table
for processing 11-28A's Drilling Permit.
Thanks for the help,
Allen
1 of 1 6/28/00 2:13 PM
~e: 11-28A FIT's (PTD-200-095)
Subject: Re: 11-28A FIT's (PTD-200-095)
Date: Wed, 28 Jun 2000 15:34:19 -0800
From: Tom Maunder <tom_maunder@admin.state.ak. us>
To: "Sherritt, Allen (ARCO)" <SherriJ&@BP.com>
Thanks Al!!
Tom
"Sherritt, Allen (ARCO)" ~rote:
> Tom,
> Allen
We will perform two FIT's; (b ~- ~t u~ % ~rx_~ ,
#1. After drilling 20' newformation outside window, perform a FIT to 12.0
ppg EMW. The Cretaceous is estimated to be at 9.8 ppg EMW.
#2. After drilling out the 7" shoe and 20' new formation, perform a FIT to
9.5 ppg EMW. The reservoir pressure is estimated to be 7. 6 ppg EMW, 3420
psi.
If you need anything e/se give me a shout...
Tom Maunder <tom maunder~admin.state.ak, us>
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 1 6/28100 3:46 PM
...
wE~L PERMIT CHECKLIST COMPANY ,/'~'L~"'///~S WELL NAME//' Z~5~'/"~. PROGRAM: exp .... dev' ''v/' reddl ~':" serv ' wellbore sag ..
FIELD&PoOl' ' /~-?..~_~/~_/"~ iNi~cLAss d ~~.L/ ~'~t/-- GEOLAREA ~,4~<:~% ..... UNIT#
ADI~NISTRATION
1. Permit fee attached .......................
2. Lease number appropriate?~: ~'.~.
3. Unique well name and number ..................
4. Well located in a defined pool .................. ;? N
5. Well located proper distance from drilling unit boundary ....
N
6. Well located proper distance from other wells .......... N
7. Sufficient acreage available in drilling unit ............
N
8. If deviated, is wellbore plat included ............... N
9. Operator only affected party ...................
N
10. Operator has appropriate bond in force ............. N
11. Permit can be issued without conservation order ........
N
DATE. 12. Permit can be issued without administrative approval ...... "'~.~N
~ ~. 'Z.(- CL~ 13. Can permit be approved before 15-day wait ...........
ENGINEERING 14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a to-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
ann. disposal para req ~
ON/OFF SHORE
23.
24.
25.
.DATE 26.
~ (,,, 27.
28.
.._ 29.
GEOLOGY 30.
31.
32.
_~ DATE 33.
If diverter required, does it meet regulations ..........
Drilling fluid program schematic & equip list adequate ..... .~ N
BOPEs, do they meet regulation ................ ~ N
BOPE press rating appropriate; test to ~~ psig.
Choke manifold complies w/APl RP-53 (May 84) ........
Work will occur without operation shutdown ........... ~Y~ N ,..
Is presence of H2S gas probable .................
Permit can be issued w/O hydrogen sulfide measure,.==~. . ~_N__~,~~.///~~.//,~ . II
Data presented on potential Overpressure zones -/- ...... / Y N --- II
Seismic analysis of shallow gas zones ............ ..IA' Y N ,,~>/,~,,~,-~.:.,c~i~,- ~.~ C~__~-~c~.% gz._~-i~_j ~-)~.~¢5x~-/,C ~,'~ JJ
Seabed condition survey (if off-shore) ........... //V.TM YN II
Contact name/phone for weekly progress reports [expl~o~atory only] Y N ~ ..... ~ __ .~' '" ~ "
ANNULAR DISPOSAL35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; ....... Y N
APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
coMMISsIoN:
Comments/Instructions:
c:\msoffice\wordian\diana\checklist (rev. 02117/00)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the hiStory file.
To improve the readability of the Well History file and to
simplify'finding informatiOn, information of this
nature is accumulated at the end of the file under APPENDIXi
o.
No special'effort has been made to chronologically ' .
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Mon May 13 15:45:54 2002
Reel Header
Service name ............. LISTPE
Date ..................... 02/05/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 02/05/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
11-28A
500292195801
BP Exploration (Alaska), Inc.
Sperry Sun
13-MAY-02
MWD RUN 2 MWD RUN 3 MWD RUN 4
JOB NUMBER: AK-MM-00131 AK-MM-00131 AK-MM-00131
LOGGING ENGINEER: J. SACK J. SACK J. SACK
OPERATOR WITNESS: D. JACKSON D. JACKSON T. ANGLEN /
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MWD RUN 5
AK-MM-00131
J. SACK
T. ANGLEN /
28
lin
15E
744
290
.00
56.28
27.78
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 9.625 5288.0
2ND STRING 8.500 7.000 11590.0
3RD STRING
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
STATED.
2. MWD RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED
MWD RUNS 2 - 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS.
4. MWD RUN 5 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN),
AND
STABILIZED LITH-DENSITY (SLD).
5. GAMMA RAY LOGGED BEHIND CASING FROM 11551' MD, 8249'
TVD, TO
11590' MD, 8275' TVD.
6. DEPTH SHIFTING / CORRECTION WAIVED PER THE EMAIL
FROM
D. SCNORR OF 03/29/02. MWD CONSIDERED PDC.
THIS WELL KICKS OFF FROM 11-28 AT 5272' MD, 4100'
TVD (TOP OF WHIPSTOCK).
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
7o
MWD RUNS 1 - 5 REPRESENT WELL 11-28A WITH API %
50-029-21958-01. THIS WEL.
REACHED A TOTAL DEPTH OF 12455' MD, 8904' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING )
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING )
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING )
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING )
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN)
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN)
TNPS = SMOOTHED THERMAL NEUTRON POROSITY
(SANDSTONE MATRIX,
FIXED HOLE SIZE)
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
RATE
CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
RATE
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
6.0"
MUD WEIGHT:
PPG
MUD FILTRATE SALINITY:
CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY:
G/CC
MATRIX DENSITY:
G/CC
LITHOLOGY:
SANDSTONE
$
File Header
Service name ............. STSLIB.001
8.5
550 PPM
11,500 PPM CHLORIDES
1.00
2.65
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FCNT
RPX
RPS
RPM
RPD
FET
NCNT
NPHI
RHOB
DRHO
PEF
$
START DEPTH
5274.5
5301 5
11580 0
11580 0
11580 0
11580 0
11580 0
11580.0
11580.0
11580.0
11597.0
11597.0
11597.0
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
REMARKS:
BIT RUN NO MERGE TOP MERGE BASE
2 5274.5 7361.0
3 7361.5 10238.0
4 10238.5 11590.0
5 11590.5 12455.0
Name Service Order Units Size
DEPT FT 4
ROP MWD FT/H 4
GR MWD API 4
RPX MWD OHMM 4
RPS MWD OHMM 4
RPM MWD OHMM 4
RPD MWD OHMM 4
FET MWD HR 4
NPHI MWD PU-S 4
NCNT MWD CP30 4
FCNT MWD CP30 4
RHOB MWD G/CM 4
DRHO MWD G/CM 4
PEF MWD B/E 4
Nsam Rep Code Offset Channel
1 68 0 1
1 68 4 2
1 68 8 3
1 68 12 4
1 68 16 5
1 68 20 6
1 68 24 7
1 68 28 8
1 68 32 9
1 68 36 10
1 68 40 11
1 68 44 12
1 68 48 13
1 68 52 14
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
STOP DEPTH
12414 0
12455 0
12377 0
12421 5
12421 5
12421 5
12421 5
12421.5
12377.0
12377.0
12393.0
12393.0
12393.0
EQUIVALENT UNSHIFTED DEPTH
MERGED MAIN PASS.
$
Name Service Unit Min Max
DEPT FT 5274.5 12455
ROP MWD FT/H 0.04 2155.01
GR MWD API 9.49 538.78
RPX MWD OHMM 1.63 1850.32
RPS MWD OHMM 1.42 2000
RPM MWD OHMM 1.44 2000
RPD MWD OHMM 0.32 2000
FET MWD HR 0.54 73.26
NPHI MWD PU-S 5.3 62.58
NCNT MWD CP30 13836.2 52687.8
FCNT MWD CP30 111.18 3318.22
RHOB MWD G/CM 1.98 3.19
DRHO MWD G/CM -0.17 0.77
PEF MWD B/E 1.13 6.73
Mean
8864.75
100.592
93.5618
87.2423
117.215
177.771
316.789
2.29886
19.8503
31374
950.026
2.30891
0.0142436
2.29762
First Reading For Entire File .......... 5274.5
Last Reading For Entire File ........... 12455
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Nsam
14362
14308
14280
1684
1684
1684
1684
1684
1595
1595
1595
1593
1593
1593
First
Reading
5274.5
5301.5
5274.5
11580
11580
11580
11580
11580
11580
11580
11580
11597
11597
11597
Last
Reading
12455
12455
12414
12421.5
12421.5
12421.5
12421.5
12421.5
12377
12377
12377
12393
12393
12393
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 5274.5 7333.0
ROP 5301.5 7361.0
$
LOG HEADER DATA
DATE LOGGED: il-AUG-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.2
DOWNHOLE SOFTWARE VERSION: 65.41
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 7361.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 48.5
MAXIMUM ANGLE: 53.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01562HG6
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.500
BOREHOLE CONDITIONS
MUD TYPE: LSND HT
MUD DENSITY (LB/G): 10.20
MUD VISCOSITY (S): 40.0
MUD PH: 9.1
MUD CHLORIDES (P?M): 800
FLUID LOSS (C3): 13.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MUD AT MAX CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: .000
MUD CAKE AT MT: .000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ....... ~ ..... Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
.0
104.6
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 5274.5 7361 6317.75 4174
ROP MWD020 FT/H 1.4 482.29 143 4120
GR MWD020 API 9.49 125.09 72.2347 4118
First Reading For Entire File .......... 5274.5
Last Reading For Entire File ........... 7361
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
First
Reading
5274.5
5301.5
5274.5
Last
Reading
7361
7361
7333
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 7333.5 10197.0
ROP 7361.5 10238.0
$
LOG HEADER DATA
DATE LOGGED: 15-AUG-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.2
DOWNHOLE SOFTWARE VERSION: 65.41
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10238.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 46.5
MAXIMUM ANGLE: 50.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01562HG6
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 8.500
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE: LSND HT
MUD DENSITY (LB/G): 10.10
MUD VISCOSITY (S): 43.0
MUD PH: 9.5
MUD CHLORIDES (PPM): 1000
FLUID LOSS (C3): 2.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000 .0
MUD AT MAX CIRCULATING TERMPERATURE: .000 136.2
MUD FILTRATE AT MT: .000 .0
MUD CAKE AT MT: .000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 7333.5 10238 8785.75 5810
ROP MWD030 FT/H 0.04 764.82 103.788 5754
GR MWD030 API 10.69 196.96 82.8027 5728
First Reading For Entire File .......... 7333.5
Last Reading For Entire File ........... 10238
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
First
Reading
7333.5
7361.5
7333.5
Last
Reading
10238
10238
10197
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each ,bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10197.5
ROP 10238.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
STOP DEPTH
11551.0
11590.0
17-AUG-00
Insite 4.05.2
65.41
Memory
11590.0
45.2
50.5
TOOL NUMBER
PB01562HG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.500
11590.0
BOREHOLE CONDITIONS
MUD TYPE: LSND HT
MUD DENSITY (LB/G): 10.20
MUD VISCOSITY (S): 45.0
MUD PH: 9.3
MUD CHLORIDES (PPM): 1000
FLUID LOSS (C3): 1.6
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MUD AT MAX CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: .000
MUD CAKE AT MT: .000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
.0
143.6
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10197.5 11590 10893.8 2786
ROP MWD040 FT/H 0.33 1993.14 58.7759 2704
GR MWD040 API 37 354.32 164.617 2708
First Reading For Entire File .......... 10197.5
Last Reading For Entire File ........... 11590
File Trailer
Service name ............. STSLIB.004
service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
First
Reading
10197.5
10238.5
10197.5
Last
Reading
11590
11590
11551
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
.5000
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPX
RPS
RPD
NPHI
NCNT
FCNT
RPM
ROP
PEF
RHOB
DRHO
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
START DEPTH
11551 5
11580 0
11580 0
11580 0
11580 0
11580 0
11580 0
11580 0
11580.0
11590.5
11597.0
11597.0
11597.0
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12414.0
12421.5
12421.5
12421.5
12421.5
12377.0
12377.0
12377.0
12421.5
12455.0
12393.0
12393.0
12393.0
21-AUG-00
Insite 4.05.2
3.07
Memory
12455.0
39.1
48.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB01670FGR4
EWR4 ELECTROMAG. RESIS. 4 PB01670FGR4
SLD STABILIZED LITHO DEN PB01606NL4
CTN COMP THERMAL NEUTRON PB01606NL4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.000
BOREHOLE CONDITIONS
MUD TYPE: Quikdril-N
MUD DENSITY (LB/G): 8.40
MUD VISCOSITY (S): 39.0
MUD PH: 9.5
MUD CHLORIDES (PPM): 1000
FLUID LOSS (C3): 8.7
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): 1.400
MUD AT MAX CIRCULATING TERMPERATURE: .751
MUD FILTRATE AT MT: 1.000
MUD CAKE AT MT: 1.900
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
80.0
155.0
80.0
80.0
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3 ·
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HR 4 1 68 28 8
NPHI MWD050 PU-S 4 1 68 32 9
NCNT MWD050 CP30 4 1 68 36 10
FCNT MWD050 CP30 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO MWD050 G/CM 4 1 68 48 13
PEF MWD050 B/E 4 1 68 52 14
Name Service Unit Min Max Mean Nsam
DEPT FT 11551.5 12455 12003.3 1808
ROP MWD050 FT/H 1.47 2155.01 54.3229 1730
GR MWD050 API 14.29 538.78 68.6689 1726
RPX MWD050 OHMM 1.63 1850.32 87.2423 1684
RPS MWD050 OHMM 1.42 2000 117.215 1684
RPM MWD050 OHMM 1.44 2000 177.771 1684
RPD MWD050 OHMM 0.32 2000 316.789 1684
FET MWD050 HR 0.54 73.26 2.29886 1684
NPHI MWD050 PU-S 5.3 62.58 19.8503 1595
NCNT MWD050 CP30 13836.2 52687.8 31374 1595
FCNT MWD050 CP30 111.18 3318.22 950.026 1595
RHOB MWD050 G/CM 1.98 3.19 2.30891 1593
DRHO MWD050 G/CM -0.17 0.77 0.0142436 1593
PEF MWD050 B/E 1.13 6.73 2.29762 1593
First Reading For Entire File .......... 11551.5
Last Reading For Entire File ........... 12455
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
First
Reading
11551.5
11590.5
11551.5
11580
11580
11580
11580
11580
11580
11580
11580
11597
11597
11597
Last
Reading
12455
12455
12414
12421.5
12421.5
12421.5
12421.5
12421.5
12377
12377
12377
12393
12393
12393
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 02/05/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 02/05/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File