Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout200-111 ~';;~' oject. Well History File Cover~e Imag XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. O~' .(.2~_- _~ I L Well ,istory File Identifier REsC~,N DIGITAL DATA~' ~1 Color items: ~/~1~ ~1 Diskettes, No. [] Grayscale items: [] Other, No/Type [] Poor Quality Originals: [] Other: NOTES: BY: BEVERLY RO~HERYL MARIA WINDY Project Proofing BY: BEVERLY ROBII~ SHERYL MARIA WINDY Scanning Preparation OVERSIZED (Scannable) [] Maps: Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other BY: Production Scanning Stage 1 PAGE COUNT FROM SCANNED F~LE: .'~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ..~ YES NO BY: BEVERLY ROBIN VINCENT SHERYL MARI~WI~Y~ SiS D~~ F~ESCANNED BY; BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: IS/ General Notes or Comments about this file: Quality Checked 12/10/02Rev3NOTScanned.wp(~ F:\LaserFiche\CvrPgs _I nserts\M icrofi 1m _ Marker.doc MICROFILMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE ~~"', {, >" " '1...,....,...... "''''.,. ,"". '~M'\¡¡"'" ...', ,.. ,.,,, "~ .\ .1,> ) Permit to Drill 2001110 DATA SUBMITTAL COMPLIANCE REPORT APl No. 50-103-20345-00-00 9/9/2002 Well Name/No. KUPARUK RiV U TARN 2N-349 Operator PHILLIPS ALASKA INC. MD 6043 v TVD 5776 _ Completion Dat 9/11/2000~--~ Completion Statu P&A _ Current Status P&A - UIC N .~__- REQUIRED INFORMATION Mud Log No Sample N__go Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt (data taken from Logs Portion of Master Well Data Maint) Interval Log Log Run OH I Dataset Name Scale Media No Start Stop CH Received Number Comments 120 2338 Open 1/3/2001 09852 L'120-2338 D D R R C C L L L L L L R R D D R R L L L L L L L L D D R R D D R R 2297 5988 C, aS~ 2/22/2001 09831'"~2297-5988 9831.---'~---'' FINAL O/,v.,~ 2/22/2001 9831 ~.~-'IS Verification Digital Data LIS Verification/ FINAL 2/22/2001 ~ Verification Paper Copy 9852 / comp 120 2338 OH 1/3/2001 9852/,,,/120-2338 Digital Data Neutron Density ~ 2 FINAL 120 2338 OH 1/3/2001 120-2338 BL, Sepia AIT/AXO / 5 FINAL 120 2338 OH 1/3/2001 120-2338 BL, Sepia Dipole Shear/Sonic>.-"~ FINAL 120 2338 OH 1/3/2001 120-2338 BL, Sepia SRVY RPT~--'''''~'~ 0 6054 OH 10/5/2000 SPERRY 0-6054 Directional Survey~.._ FINAL OH 6/14/2001 Dir Survey, Digital Data · Directional Survey / FINAL OH 6/14/2001 IIFR Survey, Paper Copy Res/GR MD4..,'/ 5 FINAL 117 6043 CH 1/8/2001 117-6043 BL, Sepia Res/GR TVD/~-'"'~ 5 FINAL 117 6043 CH 1/8/2001 117-6043 BL, Sepia Neu/Den MD' ~ 5 FINAL 117 6043 CH 1/8/2001 117-6043 BL, Sepia Neu/Den TVD J 5 FINAL 117 6043 CH 1/8/2001 117-6043 BL, Sepia LDWG LIS Listing ~ 2297 5988 1/9/2001 2297-5988 Digital Data LDWG LIS Listing ~ 2297 5988 1/9/2001 2297-5988 Paper Report Directional Survey/.,/ FINAL OH 6/14/2001 Dir Survey, Digital Data Directional Survey~// FINAL OH 6/14/2001 Dir Survey, Paper Copy Well Cores/Samples Information: Name Interval Dataset Start Stop Sent Received Number Comments Permitto Drill 2001110 MD 6043 TVD DATA SUBMITTAL COMPLIANCE REPORT 9~9~2002 Well Name/No. KUPARUK RIV U TARN 2N-349 Operator PHILLIPS ALASKA INC. 5776 Completion Dat 9/11/2000 Completion Statu P&A Current Status P&A APl No. 50-103-20345-00-00 UIC N ADDITIONAL INFORMATION Well Cored? Y ~ Chips Received? ~ Analysis ~ R~r.~.iv~d ? Daily History Received? ~)N Formation Tops ~ N Comments: Compliance Reviewed By: 1216100 Schlumberger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 773 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Exploration Well Job # Log Description Date BL Sepia CD 2N-349 20375 PEX-AIT-DSl 000906 1 2N-349 20375 PEX-AIT 000906 I I . I 2N-349 20375 PEX-NEUTRON DENSITY 000906 I 1 '2N-349 20375 DSI 000906 I I .... ,, ,,, .... SIGNED~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. 3-Aug-01 AOGCC 333W 7th Ave Suite 100 Anchorage, AK, 99501 To whom it may concern, Included in this package are disks for the following final surveys as requested. · 2N-303, IFR and MWD 7_oO- · 2N-305, IFR and MWD · 2N-349, IFR and MWD ~;~- · 2N-349A, IFR and MWD If you have any questions or concerns please do not hesitate to call. Regards, -Vic EpPler SSDS IFR/SMS (907) 273-3564 RECEIVED AI~ 0 7 ~I 13-Jun-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 2N-349 MWD Dear Dear SidMadam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 6,043.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED JUN 14 2001 13-J un-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Definative Surveys Re: Distribution of Survey Data for Well 2N-349 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 'MD 6,043.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED JUN 1 4 2001 DEFINITIVE Kuparuk River Unit North Slope, Alaska Kuparuk 2N, Slot 2N-349 2N-349 Job No. AKZZ~0169, Surveyed: ~0 September, 2000 S UR VEY REPORT 13 June, 2001 Your Ref: API-501032034500 Surface Coordinates: 5911852.12 N, 460420.86 E (70° lO' 12.4084" N, 150° 19' 06.7185" W) Kelly Bushing: 153. lOft above Mean Sea Level SERVICES Survey Ref: svy9533 A Halliburton Company Kuparuk River Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) 0.00 0.000 0.000 -153.10 149.31 0.240 140.060 -3.79 238.66 0.230 171.742 85.56 338.53 0.730 258.166 185.43 367.66 1.460 263.001 214.55 399.65 2.430 259.468 428.05 3.030 259.384 458.60 3.980 262.486 517.33 5.490 262.034 577.93 6.780 263.149 638.63 7.260 267.677 697.44 5.890 273.348 760.23 4.840 272.328 820.34 3.790 271.683 881.00 3.760 262.732 246.52 274.89 305.38 363.91 424.16 484.41 542.83 605.34 665.28 725.81 Vertical Depth (ft) 0.00 149.31 238.66 338.53 367.65 399.62 427.99 458.48 517.01 577.26 637.51 695.93 758.44 818.38 878.91 933.13 3.710 243.463 777.83 930.93 993.73 3.500 226.977 838.31 991.41 1058.91 1.870 226.140 903.42 1056.52 1125.16 1.060 231.839 969.65 1122.75 1188.24 0.770 297.705 1032.72 1185.82 1282.68 0.960 305.339 1127.15 1280.25 1376.90 0.900 315.512 1221.36 1374.46 1470.74 1.090 307.463 1315.18 1468.28 1534.13 1.050 319.026 1378.56 1531.66 1598.44 2.310 294.334 1442.84 1595.94 1630.22 3.830 288.180 1474.58 1627.68 1668.82 5.530 285.021 1513.05 1666.15 1700.18 5.920 286.786 1544.25 1697.35 1762.73 6.820 284.183 1606.42 1759.52 1825.65 7.790 285.096 1668.82 1821.92 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Ref: API-501032034500 Job No. AKZZ'IO169, Surveyed: '10 September, 2000 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 0.00 N 0.00 E 5911852.12 N 460420.86 E 0.24 S 0.20 E 5911851.88 N 460421.06 E 0.56 S 0.35 E 5911851.56 N 460421.20 E 0.89 S 0.25W 5911851.23 N 460420.61E 0.97 S 0.80W 5911851.15 N 460420.06 E 1.15 S 1.87W 5911850.98 N 460418.99 E 1.39 S 3.20W 5911850.74 N 460417.65 E 1.68 S 5.04W 5911850.46 N 460415.81 E 2.34 S 9.85W 5911849.83 N 460411.00 E 3.17 S 16.27W 5911849.04 N 460404.57 E 3.75 S 23.66W 5911848.49 N 460397.18 E 3.72 S 30.38W 5911848.56 N 460390.46 E 3.43 S 36.25W 5911848.88 N 460384.60 E 3.27 S 40.77W 5911849.07 N 460380.08 E 3.46 S 44.74W 5911848.89 N 460376.10 E 4.43 S 47.95W 5911847.94 N 460372.89 E 6.57 S 51.06W 5911845.82 N 460369.77 E 8.66 S 53.28W 5911843.74 N 460367.54 E 9.79 S 54.54W 5911842.62 N 460366.27 E 9.95 S 55.37W 5911842.46 N 460365.44 E 9.20 S 56.58W 5911843.22 N 460364.23 E 8.22 S 57.74W 5911844.21 N 460363.08 E 7.15 S 58.97W 5911845.28 N 460361.86 E 6.34 S 59.83W 5911846.09 N 460361.00 E 5.36 S 61.39W 5911847.08 N 460359.44 E 4.77 S 62.99W 5911847.68 N 460357.85 E 3.88 S 66.01W 5911848.58 N 460354.83 E 3.02 S 69.01W 5911849.46 N 460351.83 E 1.18 S 75.70W 5911851.33 N 460345.15 E 0.84 N 83.44W 5911853.40 N 460337.42 E Dogleg Rate (°/100ft) 0.161 0.144 0.753 2.524 3.054 2.113 3.170 2.572 2.138 1.206 2.575 1.679 1.749 0.972 2.399 1.739 2.501 1.241 1.624 0.235 0.186 0.251 O.346 2.216 4.887 4.453 1.364 1.511 1.553 North Slope, Alaska Kuparuk 2N Vertical Section Comment 0.00 -0.21 -0.37 0.22 0.76 1.83 3.15 4.98 9.76 16.14 23.51 30.23 36.10 40.62 44.59 47.76 50.79 52.93 54.15 54.98 56.21 57.41 58.67 59.56 61.16 62.77 65.82 68.86 75.61 83.42 AK-6 BP IFR-AK '13 June, 200'1 - 14:0'1 Page 2 of 5 DrillQuest 2.00.08.005 Kuparuk River Unit Measured Depth (ft) Sub-Sea Depth (ft) Vertical Depth (ft) 1889,43 9,540 282.753 1731.87 1884.97 1952.21 11.160 280.005 1793.63 1946.73 2015.41 12.470 278.426 1855.49 2008.59 2078,32 14,090 278.275 1916.72 2069.82 2141.64 14,390 277.497 1978.09 2131.19 2197.77 15.990 277.136 2032.26 2185.36 2293.23 21.000 279.890 2122.76 2275.86 2383.35 20.470 274.116 2207.05 2360.15 2477,79 20,880 272.232 2295.41 2448.51 2572.60 21.530 273.149 2383.80 2536.90 2666.71 21.460 271.231 2471.37 2624.47 2761.68 21,640 271.759 2559.70 2712.80 2856.06 21.540 270.114 2647.46 2800.56 2950.61 22.370 274,109 2735.15 2888.25 3045.84 22.570 275,402 2823.15 2976.25 3140.10 22,020 272.732 2910.37 3063.47 3234.73 21.930 270.305 2998.13 3151.23 3329.07 22.120 271.672 3085.58 3238.68 3423,31 22.280 270.898 3172.84 3325.94 3519.67 22.450 269.910 3261.95 3415.05 3613,46 21.340 271.229 3348.97 3502.07 3708.23 21.290 271.441 3437.26 3590.36 3803.08 21.430 270.381 3525.59 3678.69 3897,99 20.400 272.024 3614.25 3767.35 3992,27 19.950 270.744 3702.75 3855.85 4086,59 19.880 272.206 3791.43 3944.53 4181.75 19,890 270.429 3880,91 4034.01 4275,98 20,100 274.783 3969.47 4122.57 4371.15 20.180 273.863 4058.82 4211.92 4465.29 20.450 274.125 4147.10 4300.20 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Ref: API-501032034500 Job No. AKZZfOf69, Surveyed: tO September, 2000 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3.14 N 92.77W 5911855.74 N 460328.11E 5.34 N 103.83W 5911858.00 N 460317.06 E 7.40 N 116.60W 5911860.13 N 460304.30 E 9.50 N 130.90W 5911862.30 N 460290.01E 11.64 N 146.33W 5911864.52 N 460274.59 E 13.51 N 160.92W 5911866.47 N 460260.02 E 18.08 N 190.83W 5911871.20 N 460230.12 E 21.98 N 222.46W 5911875.27 N 460198.52 E 23.83 N 255.75W 5911877.28 N 460165.24 E 25.44 N 290.00W 5911879.08 N 460130.99 E 26.76 N 324.46W 5911880,57 N 460096.55 E 27.67 N 359.33W 5911881.67 N 460061.68 E 28.24 N 394.05W 5911882.42 N 460026.96 E 29.56 N 429.36W 5911883.93 N 459991.66 E 32.58 N 465.63W 5911887.13 N 459955.41 E 35.13 N 501.29W 5911889.87 N 459919.76 E 36.06 N 536.68W 5911890.99 N 459884.38 E 36.68 N 572.05W 5911891.79 N 459849.01 E 37.47 N 607.65W 5911892.77 N 459813.42 E 37.73 N 644.31W 5911893.22 N 459776.76 E 38.07 N 679.28W 5911893.74 N 459741.79 E 38.87 N 713.72W 5911894.72 N 459707.35 E 39.42 N 748.26W 5911895.45 N 459672.82 E 40.12 N 782.13W 5911896.33 N 459638.95 E 40.91N 814.64W 5911897.29 N 459606.45 E 41.74 N 846.75W 5911898.28 N 459574.34 E 42.48 N 879.10W 5911899.20 N 459541.99 E 43.95 N 911.27W 5911900.84 N 459509.83 E 46.42 N 943.95W 5911903.48 N 459477.17 E 48.70 N 976.55W 5911905.92 N 459444.58 E Dogleg Rate (°/'~OOff) 2.799 2.697 2.135 2.576 0.562 2.855 5.326 2.342 0.827 0.770 0.751 0.279 0.650 1.807 0.560 1.223 0.964 0.579 0.353 0.428 1.294 0.097 0.433 1.249 0.669 0.533 0.635 1.595 0.343 0.303 North Slope, Alaska Kuparuk 2N Vertical Section Comment 92.82 103.95 116.79 131.16 146.65 161.30 191.36 223.11 256.44 290.73 325.21 360.09 394.81 430.14 466.50 502.22 537.63 573.00 608.60 645.25 680.21 714.66 749.19 783.07 815.58 847.70 880.06 912.26 945.00 977.67 ~3 June, 2001 - ~4:0~ Page 3 of 5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Reft APl-50 f 032034500 Job No. AKZZfOf69, Surveyed: fO September, 2000 Kuparuk River Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (fi) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 4560.89 20.450 274.208 4236.68 4389.78 51.12 N 1009.86W 5911908.52 N 459411.28 E 4655.05 20.740 273.349 4324.82 4477.92 53.31N 1042.91W 5911910.88 N 459378.24 E 4750.24 21.270 273.621 4413.69 4566.79 55.38 N 1076.97W 5911913.13 N 459344.20 E 4845.05 21.400 274.508 4502.00 4655.10 57.83 N 1111.37W 5911915.76 N 459309.80 E 4940.28 21.300 274.199 4590.69 4743.79 60.46 N 1145.94W 5911918.57 N 459275.25 E 5034.75 21.540 273.650 4678.64 4831.74 62.82 N 1180.36W 5911921.11N 459240.84 E 5129.63 21.640 273.515 4766.86 4919.96 65.00 N 1215.21W 5911923.47 N 459206.01 E 5224.87 21.410 271.488 4855.46 5008.56 66.53 N 1250.11W 5911925.18 N 459171.11 E 5318.53 21.280 271.465 4942.70 5095.80 67.41 N 1284.19W 5911926.24 N 459137.04 E 5414.06 21.080 273.299 5031.77 5184.87 68.84 N 1318.67W 5911927.85 N 459102.56 E 5508.65. 20.170 275.163 5120.30 5273.40 71.28 N 1351.90W 5911930.47 N 459069.35 E 5603.37 21.000 271.669 5208.98 5362.08 73.25 N 1385.13W 5911932.61N 459036.13 E 5697.96 20.360 271.626 5297.47 5450.57 74.21 N 1418.52W 5911933.75 N 459002.75 E 5792.59 19.850 272.161 5386.33 5539.43 , 75.28 N 1451.03W 5911934.99 N 458970.24 E 5887.75 19.140 271.798 5476.04 5629.14 . 76.38 N 1482.77W 5911936.25 N 458938.51 E 5972.14 18.690 271.000 5555.87 5708.97 77.05 N 1510.12W 5911937.07 N 458911.17 E 6043.00 18.690 271.000 5622.99 5776.09 77.45 N 1532.82W 5911937.58 N 458888.47 E All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and' Eastings are relative to Well. Magnetic Declination at Surface is 25.905° (31-Aug-00) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 272.060° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 6043.00ft., The Bottom Hole Displacement is 1534.77ft., in the Direction of 272.892° (True). Dogleg Rate (°/100ft) 0.030 0.445 0.566 0.367 0.158 0.331 0.118 0.817 0.139 0.724 1.186 1.565 0.677 0.573 0.757 0.615 0.000 North Slope, Alaska Kuparuk 2N Vertical Section Comment 1011.05 1044.15 1078.26 1112.74 1147.38 1181.86 1216.76 1251.70 1285.79 1320.30 1353.59 1386.87 1420.27 1452.80 1484.56 1511.91 1534.61 Projected Survey June, 200¢ - ¢4:0¢ Page 4 of 5 DrillQuest 2.00.08.005 Kuparuk River Unit Sperry-Sun Drilling Services Survey Report for 2N-349 Yo ur Reft APl-501032034500 Job No. AKZZlO169, Surveyed: l0 September, 2000 North Slope, Alaska Kuparuk 2N Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 6043.00 5776.09 77.45 N 1532.82W Comment Projected Survey Survey tool program for 2N-349 From To Measured Vertical Measured Depth Depth Depth (ft) (ft) (ft) 0.00 0.00 6043.00 Vertical Depth (ft) 5776.09 Survey Tool Description AK~6~BP_IFR-AK June, 200~ - f4:0'l Page 5 of 5 DrillQuest 2.00.08.005 Zoo -II I Kuparuk River Unit North Slope, Alaska Kuparuk 2N, Slot 2N-349 2N-349 MWD Job No. AKMMOO169, SURVEY REPORT June, 200~ Your Ref: AP1-501032034500 Surface Coordinates: 5911852.12 N, 460420.86 E (70° 10' 12.4084" N, 150° 19' 06.7185" HO Kelly Bushing: 153. lOft above Mean Sea Level 13RILLINEi SERVICES A Halliburton Company Survey Ref: svy9309 Kuparuk River Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (fi) Sperry-Sun Drilling Services Survey Report for 2N-349 MWD Your Ref: API-501032034500 Job No. AKMMO0169, Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 0.00 0.000 0.000 -153.10 0.00 117.00 0.000 0.000 -36.10 117.00 149.31 0.240 139.590 -3.79 149.31 238.66 0.230 170.910 85.56 238.66 338.53 0.730 258.190 185.43 338.53 214.55 246.52 274.89 305.38 363.91 424.16 484.41 542.83 605.34 665.28 725.81 777.83 838.31 903.42 969.65 367.66 1.460 261.950 399.65 2.430 258.150 428.05 3.030 258.570 458.60 3.980 261.150 517.33 5.490 260.140 0.00 N 0.00 E 0.00 N 0.00 E 0.05 S 0.04 E 0.37 S 0.19 E 0.70 S 0.40 W 367.65 0.79 S 0.95W 399.62 0.99 S 2.01W 427.99 1.26 S 3.34W 458.48 1.58 S 5.18W 517.01 2.38 S 9.96W 577.26 637.51 695.93 758.44 818.38 577.93. 6.780 260.890 638.63 7.260 265.160 697.44 5.890 271.000 760.23 4.840 270.190 820.34 3.790 269.540 881.00 3.760 260.460 933.13 3.710 241.710 993.73 3.500 225.600 1058.91 1.870 225.680 1125.16 1.060 231.320 3.44 S 16.35 W 4.33 S 23.71 W 4.59 S 30.43 W 4.53 S 36.3O W 4.53 S 40.82 W 878.91 4.88 S 44.79W 930.93 5.96 S 47.96W 991.41 8.18 S 51.01W 1056.52 10.32 S 53.19W 1122.75 11.46 S 54.44W 1188.24 0.770 296.920 1032.72 1185.82' 1282.68 0.960 304.410 1127.15 1280.25 1376.90 0.900 314.690 1221.36 1374.46 1470.74 1.090 306.560 1315.18 1468.28 1534.13 1.050 318.190 1378.56 1531.66 1598.44 2.310 293.190 1442.84 1595.94 1630.22 3.830 286.680 1474.58 1627.68 1668.82 5.530 283.120 1513.05 1666.15 1700.18 5.920 284.600 1544.25 1697.35 1762.73 6.820 281.910 1606.42 1759.52 11.63 S 55.27 W 10.90 S 56.49 W 9.93 S 57.67 W 8.88 S 58.91 W 8.09 S 59.78 W 7.14 S 61.37 W 6.58 S 62.97 W 5.79 S 66.02 W 5.04 S 69.05 W 3.46 S 75.81 W Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 5911852.12 N 460420.86 E 5911852.12 N 460420.86 E 5911852.07 N 460420.90 E 5911851.75 N 460421.05 E 5911851.42 N 460420.46 E 5911851.34 N 460419.91 E 5911851.15 N 460418.84 E 5911850.88 N 460417.51 E 5911850.57 N 460415.67 E 5911849.80 N 460410.89 E 5911848.77 N 460404.49 E 5911847.91N 460397.13 E 5911847.69 N 460390.41 E 5911847.78 N 460384.54 E 5911847.80 N 460380.02 E 5911847.48 N 460376.05 E 5911846.41 N 460372.87 E 5911844.20 N 460369.81 E 5911842.08 N 460367.62 E 5911840.95 N 460366.36 E 5911840.78 N 460365.53 E 5911841.52 N 460364.31E 5911842.49 N 460363.14 E 5911843.55 N 460361.90 E 5911844.34 N 460361.04 E 5911845.30 N 460359.46 E 5911845.87 N 460357.85 E 5911846.68 N 460354.81 E 5911847.44 N 460351.78 E 5911849.06 N 460345.03 E 0.000 0.743 0.142 0.756 2.517 3.057 2.114 3.151 2.575 2.133 1.168 2.589 1.677 1.749 0.986 2.335 1.701 2.501 1.240 1.618 0.234 0.188 0.252 0.348 2.222 4.899 4.466 1.330 1.516 North Slope, Alaska Kuparuk 2N Vertical Section Comment 0.00 0.00 -0.05 -0.21 0.37 0.92 1.98 3.29 5.12 9.87 16.21 23.54 30.24 36.11 40.63 44.58 47.71. 50.68 52.78 53.99 54.82 56.06 57.28 58.55 59.45 61.07 62.69 65.77 68.83 75.64 MWD Magnetic 13 June, 2001 - ~4:02 Page 2 of 5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 2N-349 MWD Your Ref: API-501032034500 Job No. AKMMOO169, Kuparuk River Unit Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (rt) 1825.65 7.790 282.380 1668.82 1821.92 1889.43 9.540 279.560 1731.87 1884.97 1952.21 11.160 276.260 1793.63 1946.73 2015.41 12.470 274.260 1855.49 2008.59 2078.32 14.090 273.100 1916.72 2069.82 2141,64 14.390 272.700 1978.09 2131.19 2197.77 15.990 272.410 2032.26 2185.36 2293.23 21.000 273.400 2122.76 2275.86 2383.35 20.470 274.430 2207.04 2360.14 2477.79 20.880 272.610 2295.40 2448.50 2572.60. 21.530 273.090 2383.79 2666.71 21.460 271.350 2471.36 2761.68 21.640 271.510 2559.69 2856.06 21.540 269.700 2647.45 2950.61 22.370 273.480 2735.14 2536.89 2624.46 2712.79 2800.55 2888.24 3045.84 22.570 274.380 2823.14 2976.24 3140.10 22.020 271.790 2910.36 3063.46 3234.73 21.930 269.500 2998.12 3151.22 3329.07 22.120 270.320 3085.57 3238.67 3423.31 22.280 269.940 3172.82 3325.92 3519.67 22.450 269.390 3261.94 3415.04 3613.46 21.340 270.680 3348.96 3502.06 3708.23 21.290 270.910 3437.25 3590.35 3803.08 21.430 269.960 3525.58 3678.68 3897.99 20.400 271.500 3614.24 3767.34 3992.27 19.950 270.240 3702.73 3855.83 4086.59 19.880 271.670 3791.41 3944.51 4181.75 19.890 269.980 3880.90 4034.00 4275.98 20.100 274.260 3969.46 4122.56 4371.15 20.180 273.370 4058.81 4211.91 Local Coordinates Northings Eastings (ft) (ft) 1.77 S 83.63W 0.03 N 93.07W 1.56 N 104.24W 2.73 N 117.12W 3.65 N 131.54W 4.44 N 147.10W 5.09 N 161.79W 6.66 N 192.02W 8.83 N 223.85W 10.88 N 257.13W 12.58 N 291.38 W 13.92 N 325.83 W 14.79 N 360.71 W 15.16 N 395.43 W 16.16 N 430.75 W 18.66 N 467.06W 20.59 N 502.76W 20.99 N 538.16W 20.93 N 573.54W 21.01 N 609.14W 20.80 N 645.81W 20.81N 680.78W 21.29 N 715.22W 21.55 N 749.77W 21.97 N 783.65W 22.47 N 816.16W 23.00 N 848.28W 23.47 N 880.64W 24.67 N 912.81W 26.85 N 945.51W Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/'~00ft) 5911850.78 N 460337.22 E 5911852.64 N 460327.80 E 5911854.22 N 460316.63 E 5911855.46 N 460303.75 E 5911856.46 N 460289.34 E 5911857.33 N 460273.79 E 5911858.06 N 460259.10 E 5911859.78 N 460228.88 E 5911862.12 N 460197.06 E 5911864.34 N 460163.79 E 5911866.23 N 460129.55 E 5911867.74 N 460095.10 E 5911868.80 N 460060.24 E 5911869.35 N 460025.52 E 5911870.53 N 459990.20 E 5911873.22 N 459953.91E 5911875.34 N 459918.22 E '5911875.92 N 459882.82 E 5911876.05 N 459847.44E 5911876.32 N 459811.84 E 5911876.30 N 459775.17 E 5911876.49 N 459740.20 E 5911877.15 N 459705.76 E 5911877.59 N 459671.21E 5911878.19 N 459637.34 E 5911878.86 N 459604.83 E 5911879.56 N 459572.72 E 5911880.20 N 459540.36 E 5911881.56 N 459508.19 E 5911883.91 N 459475.50 E 1.545 2.823 2.747 2.171 2.610 0.499 2.854 5.258 0.714 0.807 0.710 0.682 0.199 0.714 1.733 0.418 1.194 0.910 0.383 0.228 0.280 1.290 0.103 0.394 1.230 0.664 0.522 0.604 1.569 0.333 North Slope, Alaska Kuparuk 2N Vertical Section Comment 83.51 93.01 104.22 117.14 131.59 147.16 161.87 192.14 224.02 257.35 291.64 326.12 361.00 395.72 431.05 467.43 503.17 538.56 573.92 609.50 646.14 681.09 715.53 750.06 783.93 816.44 848.56 880.91 913.11 945.86 June, 2001 - ~4:02 Page 3 of 5 DrillQuest 2.00.0&005 Sperry-Sun Drilling Services Survey Report for 2N-349 MWD Your Ref: API-501032034500 Job No. AKMMO0169, Kuparuk River Unit Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) Global Coordinates Dogleg Northings Eastings Rate (ft) (ft) (°/100ft) 4465.29 20.450 273.470 4147.09 4300.19 28.80 N 978.14 W 4560.89 20.450 273.530 4236.67 4389.77 30.84 N 1011.47 W 4655.05 20.740 272.550 4324.81 4477.91 32.59 N 1044.55 W 4750.24 21.270 272.900 4413.67 4566.77 34.21 N 1078.63 W 4845.05 21.400 273.890 4501.99 4655.09 36.26 N 1113.06 W 5911886.03 N 459442.89 E 5911888.25 N 459409.56 E 5911890.17 N 459376.50 E 5911891.97 N 459342.42 E 5911894.20 N 459308.00 E 4940.28 21.300 273.520 4590.68 4743.78 38.50 N 1147.66W 5034.75 21.540 273.140 4678.63 4831.73 40.50 N 1182.10W 5129.63 21.640 273.030 4766.85 4919.95 42.38 N 1216.96W 5224.87 21.410 271.000 4855.45 5008.55 43.61 N 1251.88W 5318.53 21.280 270.950 4942.68 5095.78 44.19 N 1285.97W 5911896.62 N 459273.42 E 5911898.80 N 459238.99 E 5911900.86 N 459204.13 E 5911902.28 N 459169.22 E 5911903.04 N 459135.14 E 5414.06. 21.080 272.740 5031.76 5184.86 45.30 N 1320.46W 5508,65 20,170 274.670 5120.29 5273.39 47.44 N 1353.71W 5603.37 21.000 271.080 5208.96 5362.06 49.09 N 1386.95W 5697.96 20.360 271.120 5297.46 5450.56 , 49.73 N 1420.35W 5792.59 19.850 271.840 5386.32 5539.42 50.57 N 1452.87W 5911904.33 N 459100.65 E 5911906.64 N 459067.42 E 5911908.46 N 459034.18 E 5911909.28 N 459000.79 E 5911910.29 N 458968.28 E 5887.75 19.140 270.980 5476.03 5629.13 51.36 N 1484.61W 5972.14 18.690 270.270 5555.86 5708.96 51.66 N 1511.97W 6043.00 18.690 270.270 5622.98 5776.08 51.76 N 1534.67W 5911911.24 N 458936.53 E 5911911.68 N 458909.18 E 5911911.91N 458886.48 E All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 272.060° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 6043.00ft., The Bottom Hole Displacement is 1535.55ft., in the Direction of 271.932° (True). 0.289 0.022 0.478 0.572 0.404 0.176 0.293 0.114 0.818 0.140 0.709 1.201 1.595 0.677 0.599 0.805 0.599 0.000 North Slope, Alaska Kuparuk 2N Vertical Section Comment 978.54 1011.93 1045.05 1079.16 1113.65 1148.30 1182.79 1217.70 1252.64 1286.72 1321.24 1354.54 1387.82 1421.22 1453.75 1485.50 1512.85 1535.54 Projected Survey f3 June, 2001 - ~4:02 Page 4 of 5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 2N-349 MWD Your Ref: API-501032034500 ' Job No. AKMMO0169, Kuparuk River Unit North Slope, Alaska Kuparuk 2N Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 6043.00 5776.08 51.76 N 1534.67 W Comment Projected Survey Survey tool program for 2N-349 MWD From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 0.00 6043.00 5776.08 Survey Tool Description MWD Magnetic June, 200~ - ~4:02 Page 5 of 5 DrillQuest 2.00.08.005 PLUGGING & LOC3.TION CL~.A~,NCE R~,PORT State of Alaska 0iL & GAS CONS~ION COHMISSION -'-' -=:~ ...... '~ - Y i! e: .~.= ,_ :,?o. Well Name Cpera=mr Review the well file, and-c-_---~-~C on plugging, well head Well hear Harker Pos= Loca=ion Clearance · · o · · · · To~ WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 November 21, 1999 MWD Formation Evaluation Logs 2N-349, ~-AK-MM-00169 ~ 1 LDWG formatted Disc with verification listing. API#: 50-103-20345-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPY OF TIlE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Service Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 Date: WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 November 30, 2000 RE: MWD Formation Evaluation Logs 2N-349, AK-MM-00169 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 c~ O0-!lt 2N-349: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-103-20345-00 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-103-20345-00 2" x 5" MD Neutron & Density Logs: 50-103-20345-00 2" x 5" TVD Neutron & Density Logs: 50-103-20345-00 1 Blueline ~' 1 Folded Sepia ..- 1 Blueline 1 Folded Sepia 1 Blueline ~" 1 Folded Sepia 1 Blueline '/ 1 Folded Sepia WELL LOG TRANSMITTAL To; State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 9950! November 21, 1999 RE: MWD Formation Evaluation Logs 2N-349, AK-MM-00169 ~' 1 LDWG formatted Disc with verification listing. APIg: 50-103-20345-00 PLEASE ACKNOWLEDGE RECEI]:'T BY SIGNING AND RETURNING THE ATrACHED COPY OF TH~ TRANSMITTAL LETTER TO ~ ATFENTION OF: Sperry-Sun Drilling Service Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 Date: I]q/oI Signe~tx:~ L~I.~,_). , WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well o, D D Suspended D Abandoned I;! D 2. Name of Operator 7. Permit Number Phillips Alaska, Inc.~~, 'ii'"'i 8. AP1200-1Number11 / 300-245 3. Address P. O. Box 100360, Anchorage, AK 99510-0360 ..~--,,'!,¥ A-- 50-103-20345-00 4. Location of well at surlace i, .~j~~ ~ 9. Unit or Lease Name 158' FNL, 1172' FEL, Sec. 3, T9N, R7E, UM (ASP: 460421, 5911852) .! *~!;~ Kuparuk River Unit At Top Producing Interval 10. Well Number 110' FNL, 2532' FEL, Sec. 3, T9N, R7E, UM (ASP: 459060, 5911907) 2N-349 At Total Depth 11. Field and Pool 106' FNL, 2574' FWL, Sec. 3, T9N, R7E, UM (ASP: 458886, 5911912) Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 35 feetI ADL 375074 ALK 4293 Tarn Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or .At)and. 115. Water Depth, if offshore 16. No. of Completions September 3, 2000 September 10, 2000 September 11, 2000 (P&A'd) I N/A feel MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 6043' MD / 5776' TVD 2400' MD/2376' TVD YES [~] No DI N/A feet MD 1205' (approx) 22. Type Electric or Other Logs Run 9-7/8" hole - Dipole Shear Sonic, Induction/GR, Density-Neutron and 6-3/4" hole - GR/Res, Density-Neutron 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 16" 62.5# H-40 Surface 118' 24" 9 cu. Yds. Hi,Ih Early 7.625" 29.7# L-80 Surface 2331' 9-7/8" 430 sx AS III Lite, 240 sx Class G lay balanced cement kickoff plug from 2700'-2400' lay 3 continuous balanced cement plugs lmm 6043'-4700' 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) RECEIVED "'^ "'^ No perforations 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. i:.~,.i V ~ $ 2000 DEPT. ~NTERVAL (MD> AMOUNT & K~ND OF MATER~^L USED 6043'-4700' Pumped {i2.5 bbls Class G cement Alaska 0ii 8, Ga~ C~ns. Comm~ion Anchorage 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) N/A Plugged & Abandoned Date ol Test Hours Tested Production tor OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE J GAS-OIL RATIO I N/A Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 24-Hour Rate > 28. CORE DATA Briel description of lithology, porosity, lractures, apparent dips and pressence of oil, gas or water. Submit core chips. N/A Form 10-407 Rev. 7-1-80 i G i N AL Submit in duplicate 29. GEOLOGIC MARKER[~ 30. FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH C_.-.-.-.-.-.-.-.-.~3R, and time of each phase. T-3 5512' 5277' T-2 5550' 5312' N/A RECEiVeD ' i52000 Anch0r~e 31. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey, P&A schematic :32. I he ~by certify that the following is true and correct to the best of my knowledge. Questions? Call Brian Noel 265-6979 Signed- ~[~ I~~e''~, Title Drillin. En~3ineerin,qSupervlsor Date I~ ~ ~ James Trantharn INSTRUCTIONS Prepared by Sharon AIIsup-Dral~e General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Tarn 2N-349 Injector Open Hole P&A Schematic Conductor 16" 62.5# H-40 (118' MD/118' TVD) Sudace csg. 7 5/8" 29.7# L-80 BTCM (2330' MD / 2317' TVD) All Depths Nabors 19E R KB Reference Production open hole: 6-3/4" TD @ (6043' MD 1 5775' TVD) 17.0 ppg 'G' cement Kick-off plug 20 bbl high-vis LSND Mud 9.6 ppg LSND Mud 15.9 ppg 'G' cement PHILLIPS Alaska, Inc. A Subsidiary of PHILLIPS PETROLEUM COMPANY APl#: 50-103-20345-00 Permit # 200-111 RKB: 153' 16 bbl plug laid in from 2700'- 2400' MD. 62.5 bbl balanced plug laid in 3 stages from 6043' - 4700' MD. BDN 9/13/00 Date: 10/12/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 1 WELL:2N-349 STATE:ALASKA COUNTY: NORTH SLOPE WEST FIELD: TARN PARTICIPATING AREA SPUD:09/03/00 START COMP: RIG:NABORS 19E BLOCK: FINAL: WI: 0% SECURITY:0 API NUMBER: 50-103-20345-00 09/02/00 (D1) TD/TVD: 115/115 SUPV:R.W. SPRINGER MW: 9.8 VISC: 80 PV/YP: 28/40 ( 115) REPLACING DIVERTER KNIFE VALVE APIWL: 9.0 Rig down and move ball mill & pits. Move sub over well. Accept rig @ 1700 hrs. 9/2/00. Nipple up diveter system and function test and test all gas alarms. 09/03/00 (D2) TD/TVD: 343/343 SUPV:R.W. SPRINGER MW: 9.7 VISC: 76 PV/YP: 19/38 (228) DRILLING SURFACE (HI-LINE POWER 8 HR) APIWL: 10.0 Drill out cement. Tagged cement @ 61'. Fluid test diverter. Fish junk out of conductor (wrench). Diverter knife valve leaking, attempt to repair. Nipple up new diverter valve. Drill out cement from 61'-73'. PJSM. Drilled from 73-170' Change over to spud mud. Drilled from 170'-343' 09/04/00 (D3) MW: 10.2 VISC: 67 PV/YP: 19/30 TD/TVD: 1700/1696 (1357) DRILLING @ 1885' SUPV:R.W. SPRINGER Drilled from 343'- 1700' APIWL: 8.6 09/05/00 (D4) MW: 10.2 VISC: 52 PV/YP: 18/22 APIWL: 8.0 TD/TVD: 2338/2316 (638) RIGGING UP TO RUN CASING (24 HR HI-LINE POWER) SUPV:R.W. SPRINGER Drilling from 1700'-1809'. Pump lo-hi vis sweep. Short trip to 1042', trip back in hole, circ bttms up. Drilled from 1809' to 2338'. Pump hi-vis sweep & circ hole clean. POH short trip to 1740', RIH. Pump hi vis sweep & circ hole clean. POH. PJSM. Run Platform express. 09/06/00 (D5) MW: 9.6 VISC: 48 PV/YP: 15/15 APIWL: 6.5 TD/TVD: 2338/2316 ( 0) TESTING CASING SUPV:R.W. SPRINGER Continue logging w/platform express. PJSM. Rig up to run 7-5/8" casing, PJSM. Run 7-5/8" casing. PJSM. Pump cement. Bumped plugs, floats held. Nipple down diverter. Nipple up BOP's and test. RECEIVED i 5 2000 A~chorage Date: 10/12/00 i 5 2000 ARCO ALASKA INC. .~ ~ .~ ~ . Page: 2 WELL SUMMARY REPORT ~,~a 0i~ ~ G~ ~qs. ~0~0n Anchorage 09/07/00 (D6) MW: 9.5 VISC: 48 PV/YP: 13/15 TD/TVD: 2625/2316 (287) DRILLING @ 3120' 924 HR HI-LINE POWER) SUPV:R.W. SPRINGER APIWL: 6.0 Finish testing BOPE. PJSM. Tag cement @ 2232'. Circ hole clean. Drilled cement from 2232' to float collar @ 2245', hard cement, shoe and 20' new formation to 2358'. Perform leakoff. PJSM. RIH. Circ bottoms up. Perform 2nd leak off test to 12.7 ppg EMW. Drill from 2358' to 2625' 09/08/00 (D7) TD/TVD: 2625/2316 ( SUPV:R.W. SPRINGER MW: 9.6 VISC: 46 PV/YP: 15/14 0) DRILLING @ 4415' (24 HR HI-LINE POWER) APIWL: 4.4 Drilled from 2628'-3500'. Circ hole clean f/wiper trip. Short trip from 3500'-2324'. Drilled from 3500'-4068' 09/09/00 (D8) MW: 9.7 VISC: 46 PV/YP: 14/11 APIWL: 3.6 TD/TVD: 5649/5400 (3024) @ T.D., CIRCULATING PRIOR TO CSG WIPER TRIP (24 HR HI- SUPV:R.W. SPRINGER Drilled from 4068'-5649' 09/10/00 (D9) MW: 9.6 VISC: 43 PV/YP: 12/10 APIWL: 3.8 TD/TVD: 6043/5776 (394) CONDITIONING &CIRCULATING ON BTM FOR CEMENT PLUGS. (24 SUPV:R.W. SPRINGER Drilled from 5649'-6043'. Circ and condition w/sweep. Monitor well, pump pill, POH to shoe, no tight spots. RIH to bottom. Circ & condition, check for flow & pump dry job. POH check for flow @ shoe. Rig up to run 2-7/8" tubing cementing stinger. 09/11/00 (D10) TD/TVD: 6043/5776 ( SUPV:R.W. SPRINGER MW: 9.6 VISC: 41 PV/YP: 12/ 8 0) FINISHING TESTING BOPE. APIWL: 3.8 R/U to run tubing cementing stinger. RIH w/tubing. Circ & condition for cement plug. Lay balanced cement plug in three stages from 6043'-4700'. POH to 4324'. Circ hole clean. PJSM. Circ & condition mud @ 3000'. Pump hi-vis gel mud pill & POH, laying pill from 3000' to 2700'. Lay densified balanced cement kickoff plug from 2700' to 2400'. POH slowly to 2400', circ clean. POH. Rig up to test BOPE. 09/12/00 (Dll) MW: 9.6 VISC: 45 PV/YP: 14/12 APIWL: 4.0 TD/TVD: 3145/3028 ( 0) DRLG 6 3/4" HOLE @ 3560' ( RIG ON HI LINE POWER LAST 2 SUPV:DEARL W. GLADDEN Set test plug, test BOPs to 300/3500 psi. TIH, tag cmt @ 2513'. Circ & cond. Sidetrack time drill 2513' to 2530' Dir drilling 2530' to 3145' 09/13/00 (D12) MW: 9.6 VISC: 47 PV/YP: 15/13 APIWL: 3.6 TD/TVD: 4513/4142 (1368) DIR DRLG 6 3/4" HOLE @ 4859' (RIG ON HI LINE POWER LAS SUPV:DEARL W. GLADDEN Dir drilling from 3145' to 3660'. CBU. Wiper trip to shoe. Dir drilling from 3660' to 4513'. Circ hole clean. Date: 10/12/00 ARCO ALASKA INC. WELL SUMMARY REPORT Page: 3 09/14/00 (D13) MW: 9.6 VISC: 46 PV/YP: 13/15 APIWL: 3.4 TD/TVD: 5338/4812 ( 825) DIR DRLG 6 3/4" HOLE @ 6080' (RIG ON HI LINE POWER THE SUPV:DEARL W. GLADDEN Dir drilling from 4513' to 5338' 09/15/00 (D14) MW: 9.6 VISC: 42 PV/YP: 10/10 APIWL: 3.6 TD/TVD: 6498/5756 (1160) TOH -L/D BHA SUPV:DEARL W. GLADDEN Dir drilling from 5833' to 6498'. Circ hole clean, rotate & recip pipe, monitor well, pump dry job. Wiper trip to surface shoe @ 2330', no excess drag, no swab. C/O 20" air boot on BOP riser. TIH, no tight hole. Circ and condition mud to run casing. 09/16/00 (D15) MW: 9.6 VISC: 42 PV/YP: 10/10 APIWL: 3.6 TD/TVD: 6498/5756 ( 0) CMT 5.5" X 3.5" CSG. SUPV:DEARL W. GLADDEN Circ and condition hole to run casing. Monitor well. TOH. R/U to run 3.5" tubing on mono bore completion. PJSM. Run 3.5" tubing. Run 5.5" casing. Circ & cond, CBU. Cont to run casing. CBU @ 2300' Continue to run casing. 09/17/00 (D16) MW: 8.5 VISC: 0 PV/YP: 1/ 0 APIWL: 0.0 TD/TVD: 6498/5756 ( 0) L/D DP OUT OF DERRICK(RIG ON HI LINE POWER LAST 24 HRS SUPV:DEARL W. GLADDEN Continue running 5.5" x 3.5" mono bore casing. Circ and condition to cement casing. PJSM. Cement casing. Bumped plug. Floats held. Set packoff and test to 5000 psi, OK. Run 3.5" tubing. 09/18/00 (D17) MW: 8.5 VISC: 0 PV/YP: 0/ 0 APIWL: 0.0 TD/TVD: 6498/5756 ( 0) WELL 2N-305 - NIPPLE UP & READY PITS FOR SPUD MUD ( RI SUPV:DEARL W. GLADDEN Circ sea water until well clean. Pump freeze protect down annulus. Pressure test tubing to 3500 psi, OK. Pressure test 5.5"x 3/5" annulus to 3500 psi. N/D BOPs, NU tree and test to 5000 psi. Release rig @ 8:30 pm 9/18/00. PJSM. Move rig module. .... SURVEY CALCULATION AND FIELD WORKSHEET Job No. 0450-00047 Sidetrack No. Page ___! .... of 4 i=i:l~l~.:_.I :(~...~ Company PHILLIPS ALASKA, INC. Rig Contractor & No. Nabors Alaska Drlng - Rig: #19E Field TARN DEVELOPMENT FIELD Well Name & No. TARN DRILLSITE 2N/349 Survey Section Name Definitive Survey BHI Rep. HENDERSON / HARSTAD jJvr~~ WELL DATA Target TVD (F'r) Target Coord. N/S Slot Coord. N/S -157.20 Grid Correction 0.000 Depths Measured From: RKB ~ MSL ~ SS~ Target DesCription Target Coord. E/W Slot Coord. E/W -1171.81 Magn. Declination 25.910 Calculation Method MINIMUM CURVATURE Target Direction (DD) Build\Walk\DL per: 100ft[~ 30m~ 10m[~ Vert. Sec. Azim. 272.06 Magn. to Map Corr. 25.910 Map North to: OTHER SURVEY DATA Survey Survey Incl. Hole Course Vertical Total Coordinate Build Rate Walk Rate Date Tool Depth Angle Direction Length TVD Section N(+) / S(-) E(+) / W(-) DL Build (+) Right (+) Comment Type (F~ (DD) (DD) (F~). (FT) (FT) (Fi') (Per 100 F'r) Drop (-) Left (-) 0.00 0.00 0.00 ~ 0.00 0.00 0.00 0.00 TIE IN POINT 03-SEP-00 MWD 115.00 0.00 0.00 115.00 115.00 0.00 0.00 0.00 0.00 0.00 8" MlC 1.4 DEG AKO 03-SEP-O0 MWD 149.31 0.24 139.59 34.31 149.31 -0.05 -0.05 · 0.05 0.70 0.70 03-SEP-O0 MWD 238.66 0.23 170.91 89.35 238.66 , -0.21 -0.37 0.20 0.14 -0.01 '04-SEP-00 MWD 338.53 0.73 258.19 99.87 338.53 0.37 -0.70 -0.39 0.76 0.50 04-SEP-00 MWD 367.66 1.46 261.95' 29.13 367.65 0.91 -0.79 -0.94 2.52 2.51 O4-SEP-00 MWD 399.65 2.43 258.15 31.99 399.62 1.97 -0.99 -2.01 3.06' 3.03 04-SEP-00 MWD 428.05 3.03 258.57 28.40 427.99 3.29 -1.26 -3.34 2.11 2.11 04-SEP-00 MWD 458.60 3.98 261,15 30.55 458.48 5.12 -1.58 -5.18 3.15 3.11 04-SEP-00 MWD 517.33 5.49 260.14 58.73 517.01 9.87 -2.38 -9.96 2.57 2.57 -1.72 04-SEP-00 MWD 577.93 6.78 260.89 60.60 577.26 16.21 -3.44 -16.35 2.13 2.13 1.24 04-SEP-00 MWD 638.63 7.26 ,265.16 60.70 637.51 23.53 -4.33 -23.71 1.17 0.79 7.03 04-SEP-00 MWD 697.44 5.89 271.00 58.81 695.93 30.24 -4.59 -30.43 2.59 -2.33 9.93 04-sEp-00 MWD 760,23 4.84 270.19 62.79 758.44 36.11 -4.53 -36.30 1.68 -1.67 04-SEP-00' MWD 820.34 3.79 269.54 60.11 818.38 40.63 -4.54 -40.82 1.75 -1.75 83 04-SEP-O0 MWD 881.00 - 3.76 260.46 60.66 878.91 44.58 -4.88 -44.78 0.99 -0.05 ~ ~_~J.~ 04-SEP-00 MWD 933.13 3.71 241.71 52.13 930.93 47.71 -5.96 -47.96 2.33 -0.10 ~,~ ~ 04-SEP-00 MWD 993.73 3.50 225.60 60.60 991.41 50.68 -8.19 -51,00 1.70 -0.35 ~? 04~SEP-00 MWD 1058.91 1.87 225.68 65,18 1056.52 52.78 -10.32 -53.19 2.50 -2.50 ~ ~¢~ 04-SEP-00 MWD 1125.i6 1.06 231.32 66.25 1122.75 53.99 -11.46 -54.44 1.24 -1.22 ~,~. 04-SEPt00 MWD 1188.24 0.77 296.92 63.08 1185182 54.82 '-11.63 -55.27 1.62 -0.46 ............ _' ................................ :._..c, 04.SFP-00 MWD 1282.68 0.96 304.41 : 94.44 1280.25 56.06 -10.90 -56.49 0.23 0.20 .,,, 04-SEP-00 MWD 1376.90 0.90 314.69 94.22 1374.46 57.27 -9.93 -57.67 0.19 -0.06 04-SEP-00 MWD 1470.74~ 1.09 306.56 93.84 1468.28 58.55 . -8.88~ ' ..... -58.91 0.25 0.20 Company PHILLIPSALASKA, INC. Rig Contractor & No. Nabors Alaska Drlng - Rig: #19E Field TARN DEVELOPMENT FIELD Well Name & No. TARN DRILLSITE 2N/349 Survey Section'Name Definitive Survey . .. BHI Rep. HENDERSON / HARSTAD j~llllrr~~ WELL DATA Target TVD (FT) Target Coord. N/S Slot Coord. N/S -157.20 Grid Correction 0.000 Depths Measured From: RKB ~] MSL E] ssE] Target Description Target Coord. E/W SI°t COord. EIW -1171.81 Magn. Declination 25.910 Calculation Method MINIMUM CURVATURE Target Direction (oD) Bbild\Walk\DL per: 100ft~ 30mE] lOmE] Vert. Sec. Azim. 272.06 Magn. to Map Corr. 25.910 Map North to: OTHER SURVEY DATA Survey Survey Incl. Hole Course Vertical Total Coordinate Build Rate Walk Rate Date Tool Depth Angle Direction Length TVD. Section N(+) / S(-) E(+) / W(-) DL Build (+) Rlght (+) Comment Type (F'r) (DO) (OD) {Fl')' (F-r) {FT) (F'r) (Per mO F'r) Drop (-) Left (-) 04-SEP-00 MWD 1534.13 1.05 318.19 63.39 1531.66 59.45 -8.09 -59.78 0.35 -0.06 04-SEP-00 MWD 1598.44 2.31 293.19 64.31 1595.94 61.07 -7.14 -61.36 2.22 1.96 04-SEP-O0 MWD 1630.22 3.83 286.68 31.78 1627.68 62.69 -6.58 -62.97 4.90 4.78 -- 05-SEP-00 MWD 1668.82 5.53 283.12 38.60 1666.15 65.76 -5.79 -66.02 4.47 4.40 -9.22 ~- 05-SEP-00 MWD 1700.18 5.92 284.60 31.36 1697.35 68.83 -5.04 -69.05 1.33 1.24 4.72 05-SEP-00 MWD 1762.73 6.82 281,91' 62.55 1759.51 75.63 -3.46 -75.81 1.52 1.44 -4,30 05-SEP-00 MWD 1825.65 7.79 282.38 62.92 1821.92 83.51 -1.78 -63.63 1.54 1.54 0.75 05-SEP-00 MWD 1889.43 9.54 279.56 63.78 1884.97 93.00 0.03 -93.06 2.82 2.74 -4.42 05-SEP-00 MWD 1952.21 11.16 276.26 62.78 1946.73 104.22 1.55 -104.23 2.75 2.58 -5.26 ~:'~"' '"3 ~ c'~ ~.~,~ 05-SEP-00 MWD 2015.41 12.47 274.26 · 63.20 2008.59 117.14 2.73 -117.12 2.17 2.07 -3.16 ! 05-SEP-00 MWD 2078.32 14.09 273.10 62.91 2069.82 131.59 3.65 -131.54 2.61 2.58 -1.84 05-SEP-00 MWD 2141.64 14.39 .272.70 63.32 2131.19 147.16 4.43 -147.09 0.50 0.47 -0.63 05-SEP-00 MWD 2197.77 15.99 272.41 56.13 2185.36 161.87 .5.09 -161.79 2.85 2.85 -0.52 · 05-sEp-00 MWD 2293,23 21.00 273.40 95.46 2275.86 192.13 6.66 -192.02 5.26 5.25 1.04 07-SEP-00 MWD 2383.35 20.47 274.43 90.12 2360.14 224.02 8.83 -223.85 0.71 -0.59 1.14 4 3/4' M1/XL 1.2 DEG AKO 07-SEP-00 MWD 2477.79 - 20.88 272.61 94.44 2448.50 .257.35 10.87. -257.13 0.81 0.43 -1.93 07-SEP-00 MWD 2572.60 21.53 273.09 94.81 2536.89 291.64 12.58 -291.38 0.71 0.69' 0.51 .. 08-SEP-00 MWD 2666.71 21.46 271.35 94.11 2624.46 326.12 13.92 -325.83 0.68 -0.07 -1.85 08;SEP-00 MWD 2761.68 21.64 271.51 94.97 2712.79 361.00 14.79 -360.70 0.20 0.19 0.17 08-SEP-00 MWD 2856.06 21.54 269.70 94.38 i 2800.55 395.71 15.16 -395.43 0.71 -0.11 -1.92 08-SEP-'00 MWD, 2950.61 '22.37 273.48 94.55 2888.24 431.05 16.16 -430.74 1.73 0.88 4.00 . 08-SEP-00 MWD 3045.84 22.57 274.38 95.23 2976.24 467,42 18.65 -467,05 0,42 0.21 0,95 08-SEP-00 MWD 3140.10 22.02 271.79 .94.26 3063.46 503.17 20.59 -502.75 1.19 -0.58 -2,75 , 08-SEP-00 MWD 3234.73 ' 21.93 269.50 94.63 3151.22 .538.56 ' 20.99 -538.15 0.91 -0.10 -2.42 I I SURVEY CALCULATION AND FIELD WORKSHEET Job No. 0450-00047 Sidetrack NO, Page _.._3.._ of 4 Company PHILLIPS ALASKA, INC. Rig Contractor & No. Nabors Alaska Drlng - Rig: #19E Field TARN DEVELOPMENT FIELD ..... Well Name & No. TARN DRILLSITE 2N/349 Survey Section Name Definitive Survey BHI Rep. HENDERSON / HARSTAD J~Jllilrr~~ WELL DATA Target TVD (F'r) Target Coord. N/S Slot Coord, N/S -157,20 Grid Correction 0,000 Depths Measured From: RKB ~ MSL E] SS~ Target Description Target Coord, F_JW Sl°t Coord, E/W -1171,81 Magn, Declination 25,910 Calculation Method MINIMUM CURVATURE Target Direction (DD) Bdild\Walk\DL per: 100ff~ 30mE~ lomE] Vert, Sec, Azim, 272,06 Magn, to Map Corr, 25,910 Map North to: OTHER SURVEY DATA Survey Survey Incl, Hole Course Vertical Total Coordinate Build Rate Walk Rate Date Tool Depth Angle Direction Length TVD Section . N(+) / S(-) E(+) / W(-) DL Build (+) Right (+) Comment Type (FT) (DD) (OD) (FT) . (F'D .. (FT) (FT) (Per mO FT) Drop (-) Left (-) 08-SEP-00 MWD 3329.07 22.12 270.32 - 9.4.34 3238.67 573.91 20.93 -573.53 0.38 0.20 0.87 08-SEP-O0 MWD 3423.31 22.28 269.94 94.24 3325.92 609.50 21.01 -609.14 0.23 0.17 -0.40 08-SEP-00 MWD 3519.67 22.45 269.39 96.36 3415.04 646.13 20.80 -645.80 0.28 0.18 -0.57 , 08-SEP-O0 MWD 3613.46 21.34 270.68 93.79 3502.06 681.08 20.81 -680.78 1.29 -1.18 1.38 08-SEP-O0 MWD 3708.23 21129 270.91 94.77 3590.35 715.52 21.29 -715.22 0.10 -0.05 0.24 08-SEP-00 MWD 3803.08 21.43 269.96' 94.85 3678.68 750.06 21.55 -749.77 0.39 0.15 -1.00 08-SEP-00 MWD 3897.99 20.40 271.50 94.91 3767.34 783.93 21.97 -783.64 1.23' -1.09 1.62 08-SEP-00 MWD 3992.27 19.95 270.24 94.28 3855183 816.43 22.47 -616.15 0.68 -0.48 -1.34 09-SEP-00 MWD 4086.59 19.88 271.67 94.32 3944.51 848.55 23.00 -848.27 0.52 -0.07 1.52 09-SEP-00 MWD 4181.75 19.89 269.98 95.16 4034.00 880.91 23.47 -680.63 0.60 0.01 -1.78 . 09-SEP-O0 MWD 4275.98 20.10 274.26 94.23 4122.56 913.11 24.66 -912.81 i 1.57 0.22 4.54 09-SEP-00 MWD 4371,15 20,18 ,273,37 95,17 4211,91 945,86 26,84 -945,51 0,33 0,08 -0,94 09-SEP-00 MWD 4465,29 20,45 273,47 94,14 4300,19 978,54 28,79 -978,13 0,29 0,29 0,1.1 ~.~" 09-SEP-00::; MWD 4560,89 20,45 273,53 95,60 4389,77 1011,93 30,83 -1011,47 0,02 0,00 0,06 -~, 09-SEP-00 ~ MWD 4655,05 20,74 272,55 94,16 4477,91 1045,04 32,59 -1044,55 0,48 0,31 -1,04 09-SEP-00 MWD 4750.24 ' 21.27 272.90 95.19 4566.77 1079,16 34.21 -1078.63 0.57 0.56 0.37 09-SEP-00 MWD 4845,05 21,40 273,89 94,81 4655,09 1113.64 36.25 -1113,06 0.40 0,14 1,04 09-SEP-O0 MWD 4940,28 21,30 273,52 95,23 4743,78 1148,30 38,49 '-1147,66 0,18 -0,11 -0,39 09-SEP-00 MWD 5034,75 21,54 273,14 94,47 4831,73 1182,79' 40,50 -1182,10 0.29 0.25 -0,40 ,~. '~-'-- .__ 09-SEP-00 MWD 5129,63 21,64 273,03 94.88 4919,95 1217,70 42.38 -1216.96 0.11 0.11 -0.12 __ 09-SEP-~0 MWD 5224.87 21,41 271.00 95,24 5008.55 1252,64 43.61 -1251.88 0182 -0.24 ,2,13 ,. -- -- 09-gEP-00 MWD 5318,53 21,28 270,95 93,66 5095,78 1286,72 44,19 -1285,96 0,14 -0,14 -0,05 09-SEP-00 MWD 5414,06 21,08 272,74 95,53 5184,86 1321,23 45.30 -1320,46 0,71 -0,21 1,87 09-SEP-00 MWD 5508,65.: · 20,17 274;67 94,59 5273,39 '1354,53 ' 47,44. -1353,70 1,20 -0,96 2,04 I , , SURVEY CALCULATION AND FIELD WORKSHEET Job No. 0450-00047 Sidetrack No. Page 4 of 4 Company PHILLIPS ALASKA, INC. Rig Contractor & No. Nabors Alaska Drlng - Rig: #19E Field TARN DEVELOPMENT FIELD Well Name & No. TARN DRILLSITE 2N/349 Survey Section Name Definitive Survey BHI Rep. HENDERSON / HARSTAD J~~ WELL DATA Target 'I'VD {FT) Target Coord, N/S Slot Coord, N/S -157,20 Grid Correction 0.000 Depths Measured From: RKB ~_] MSL ~ SSI*- Target Description Target Coord, E/W SI°t COord, E/W -1171,81 Magn, Declination 25,910 Calculation Method .M_I_NIMUM CURVATURE Target Direction (De) B[jild\Walk\DL per: 100ff[~ 30mQ 10mQ Vert, Sec, Azim, 272,06 Magn, to Map Corr, 25,910 Map North to: OTHER SURVEY DATA , ,_ Survey Survey Incl. Hole Course Vertical Total Coordinate Build Rate Walk Rate Date Tool Depth Angle Direction Length TVD Section N(+) / S(-) E(+) / W(-) DL Build (+) Right (+) Comment Type (F~ (DD) (DD) (FT). (FT) (FT) (F'r) (Per 100 FT) Drop (-) Left (-) 09-SEP-00 MWD 5603.37 21.00 271.08 94.72 5362,06 1387.82 49.09 -1386.95 1.59 0.88 -3.79 -. 10-SEP-00 MWD 5697.96 20.36 271.12 94.59 5450.56 1421.22 49.73 -1420.35 0.68 -0.68 0.04 10-SEP-00 MWD 5792.59 19.85 271.84 94.63 5539.42 1453.74 50.57 -1452.86 0.60 -0.54 0.76 10-SEP-00 MWD 5887.75 19.14 270.98 95.16 5629.13 1485.50 51.35 -1484.61 0.80 -0.75 -0.90 10-SEP-00 MWD 5972.14 18.69 270.27 84.39 5708.96 1512.84 51.65 -1511.97 0.60 -0.53 -0.84 10-SEP-00 MWD 6043.00 18.69 270.27' 70.86 5776.08 1535.54 51.76 -1534.67 0.00 0.00 0.00 Projected Data - NO SURVEY ! , ._ , - . ~ ....................................... ii PHILLIPS Alaska, Inc. Subsidiary of PHILLIPS PETROLEUM COMPANY Post Office Box 100360 Anchorage, Alaska 99510-0360 J. Trantham Phone (907) 265-6434 Fax: (907) 265-6224 November 14, 2000 Mr. Daniel T. Seamount, Jr. Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Completion Report for 2N-349 and 2N-349A (200-111 and 200-139) Dear Mr. Commissioner: Phillips Alaska, Inc. submits the attached Completion Report for the P&A operations on 2N-349 and the drilling operations on 2N349A. If you have any questions regarding this matter, please contact me at 265-6434 or Brian Noel at 265- 6979. Sincerely, J. Trantham Drilling Engineering Supervisor PAI Drilling JT/skad RECEIVED i~JV 1 5 2000 Alaska OiJ & Gas Cons. Corm'n~Jon Anchorage ORiGiNAL 05-Oct-00 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 2N-349 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD 'MD 6,043.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. . , Regards, Kenneth W. Allen Survey Manager Attachment(s) North Slope Alaska Alaska State Plane 4 Kuparuk 2N 2N.349 Job No. AKMMO0169, ORIGINAL SURVEY REPORT $ October, 2000 Your Ref: API-501032034500 Surface Coordinates: 5911852.12 N, 460420.86 E (70° 10' 12.4084" N, 209° 40' 53.2815" E) Kelly Bushing: 153.10ft above Mean Sea Level ~~r-,r,~/-sun. ORI I__ L. I N 1311 A Halliburton Company RECEIVED OCT 12 011 & ~ Omm. Ommmlm~l~m ~nclmraoe Survey Ref: svy9309 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Reft AP!.501032034500 Job No. AKMMO0169, North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Local Coordinates Depth NorthingS Eastings (ft) (ft) 0.00 0,000 0.000 -153.10 0.00 117.00 0.000 0.000 -36.10 117.00 149.31 0.240 139.590 -3.79 149.31 238.66 0.230 170.910 85.56 238.66 338.53 0.730 258.190 185.43 338.53 367.66 1,460 261.950 399.65 2.430 258.150 428.05 3.030 258.570 458.60 3.980 261.150 517.33 5.490 260.140 577.93 6.780 260.890 638.63 7.260 265,160 697.44 5.890 271.000 760,23 4.840 270.190 820.34 3.790 269,540 260.460 241.710 225.600 225.680 231.320 296.920 304.410 314.690 306.560 318.190 881.00 3.76O 933.13 3.710 993.73 3.500 1058.91 1.870 1125.16 1.060 214.55 246.52 274.89 305.38 363.91 424.16 484,41 542.83 605.34 665.28 725.81 777.83 838.31 903.42 969.65 1032.72 1127.15 1221.36 1315,18 1378.56 1188.24 0.770 1282.68 0.960 1376.90 0.900 1470.74 1.090 1534.13 1.050 367.65 399.62 427.99 458.48 517.01 577.26 637.51 695.93 758.44 818.38 878.91 930.93 991.41 1056.52 1122.75 1185.82 1280.25 1374.46 1468.28 1531,66 0.00 N 0.00 E 0.00 N 0,00 E 0.05 S 0.04 E 0.37 S 0.19 E 0.70 S 0.40 W 0.79 S 0.95 W 0.99 S 2.01 W 1.26 $ 3.34 W 1.58 S 5.18 W 2.38 S 9.96 W 3.44 S 16.35 W 4.33 S 23.71 W 4.59 S 30.43 W 4.53 S 36.30 W 4.53 S 40.82 W 4.88 S 44.79 W 5.96 S 47.96 W 8.18 S 51,01 W 10.32 S 53.19 W 11.46 S 54.44 W 11.63 S 55.27 W 10.90 $ 56.49 W 9.93 S 57.67 W 8.88 S 58.91 W 8.09 S 59.78 W Global Coordinates Dogleg Northings Eastings Rate (fi) ~{ff) (°/lOOff) Alaska State Plane 4 Kuparuk 2N Vertical Section Comment 5911852.12 N 460420.86 E 0.00 5911852.12 N 460420.86 E 0.00 0.00 5911852.07N 460420.90 E 0,74 -0.05 5911851.75 N 460421.05 E 0.14 -0.21 · 5911851.42 N 460420.46 E 0.76 0.37 5911851.34N 460419.91 E 2.52 0.92 5911851.15 N 460418.84 E 3.06 1.98 5911850.88 N 460417.51E 2.11 3.29 5911850.57 N 460415.67 E 3.15 5.12 5911849.80 N 460410.89 E 2.57 9.87 5911848.77 N 460404.49 E 2.13 16.21 5911847.91N 460397.13 E 1.17 23.54 5911847.69 N 460390.41 E 2.59 30.24 5911847.78 N 460384.54 E 1.68 36.11 5911847.80 N 460380.02E 1.75 40.63 5911847.48 N 460376.05 E 0.99 44.58 5911846.41N 460372.87 E 2.33 47.71 5911844.20 N 460369.81 E 1.70 50.68 5911842.08 N 460367.62 E 2.50 52.78 5911840.95 N 460366.36 E 1.24 53.99 5911840.78 N 460365.53 E 1.62 54.82 5911841.52 N 460364.31E 0.23 56.06 5911842.49 N 460363.14 E 0.19 57.28 5911843.55 N 460361.90 E 0.25 58.55 5911844.34 N 460361.04 E 0.35 59.45 5 October, 2000- 14:59 -2- RECEIVED OCT 12 2000_ Continued... DrillQuest 2. 00. 02 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Ref: API-501032034500 Job No. AKMMO0169, North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (~) (~) (~) 1598.44 2.310 293.190 1442.84 1595.94 1630.22 3.830 286.680 1474.58 1627.68 1668.82 5.530 283.120 1513.05 1666.15 1700.18 5.920 284.600 1544.25 1697.35 1762.73 6.820 281.910 1606.42 1759.52 1825.65 7.790 282.380 1668.82 1821.92 1889.43 9.540 279.560 1731.87 1884.97 1952.21 11.160 276.260 1793.63 1946.73 2015.41 12.470 274.260 1855.49 2008.59 2078.32 14.090 273.100 1916.72 2069.82 2141.64 14.390 272.700 1978.09 2131.19 2197.77 15.990 272.410 2032.26 2185.36 2293.23 21.000 273.400 2122.76 2275.86 2383.35 20.470 274.430 2207.04 2360.14 2477.79 20.880 272.610 2295.40 2448.50 2572.60 2~.530 273.090 2383.79 2536.89 2666.71 21.460 271.350 2471.36 2624.46 2761.68 21,640 271.510 2559,69 2712.79 2856.06 21.540 269.700 2647,45 2800.55 2950.61 22.370 273.480 2735,14 2888,24 3045.84 22.570 274.380 2823.14 2976.24 3140.10 22.020 271.790 2910,36 3063.46 3234.73 21.930 269.500 2998.12 3151.22 3329.07 22.120 270.320 3085.57 3238.67 3423.31 22.280 269.940 3172.82 3325.92 Local Coordinates Northings Eastings (ft) (ft) 7.14 S 61.37 W 6.58 S 62.97 W 5.79 S 66.02 W 5.04 S 69.05 W 3.46 S 75.81 W 1.77 $ 83.63 W 0.03 N 93.07 W 1.56 N 104.24 W 2.73 N 117.12 W 3.65 N 131.54 W 4.44 N 147.10 W 5.09 N 161.79 W 6.66 N 192.02 W 8,83 N 223,85 W 10.88 N 257.13 W 12.58 N 291.38W 13.92 N 325.83W 14.79 N 360.71W 15.16 N 395.43W 16.16 N 430.75W 18.66 N 467.06 W 20.59 N 502.76 W 20.99 N 538.16 W 20.93 N 573.54 W 21.01 N 609.14 W Global Coordinates Dogleg Northings Eastings Rate (ft) ~(ft) (°/lOOft) 5911845.30N 460359.46 E 2.22 5911845.87 N 460357.85 E 4.90 5911846.68 N 460354.81 E 4.47 5911847.44N 460351.78 E 1.33 5911849.06 N 460345.03 E 1.52 5911850.78 N 460337.22 E 1.54 5911852.64 N 460327.80 E 2.82 5911854.22N 460316.63 E 2.75 5911855.46 N 460303.75 E 2.17 5911856.46 N 460289.34 E 2.61 5911857.33 N 460273.79 E 0.50 5911858.06 N 460259.10 E 2.85 5911859.78 N 460228.88 E 5.26 5911862.12 N 460197.06 E 0.71 5911864.34 N 460163.79 E 0.81 5911866.23 N 460129.55 E 0.71 5911867.74 N 460095.10 E 0.68 5911868.80 N 460060.24 E 0.20 5911869.35 N 460025.52 E 0.71 5911870.53 N 459990.20 E 1.73 5911873.22 N 459953.91 E 0.42 5911875.34 N 459918.22 E 1.19 5911875.92 N 459882.82 E 0.91 5911876.05 N 459847.44 E 0.38 5911876.32 N 459811.84E 0.23 RE,CEIVED OCT '12 Alaska State Plane 4 Kuparuk 2N Vertical Section Comment 61.07 62.69 65.77 68,83 75.64 83.51 93.01 lO4.22 117.14 131.59 147.16 161.87 192.14 224.02 257.35 291.64 326.12 361.oo 395.72 431.o5 467.43 5o3.17 538.56 573.92 609,50 Continued... 50ctobe~ 2000-14:59 -3- Oil & ~ ~ Comm~o~ DrillQuest ZOO.02 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Ref: APi-$01032034500 Job No. AKMMO0169, North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) Ct) 3519.67 22.450 269.390 3261.94 3415.04 3613.46 21.340 270.680 3348.96 3502.06 3708.23 21.290 270.910 3437.25 3590.35 3803.08 21.430 269.960 3525.58 3678.68 3897.99 20.400 271.500 3614.24 3767.34 3992.27 19.950 270.240 3702.73 3855.83 4086.59 19.880 271.670 3791.41 3944.51 4181.75 19.890 269.980 3880.90 4034.00 4275.98 20.100 274.260 3969.46 4122.56 4371.15 20.180 273.370 4058.81 4211.91 4465,29 20.450 273.470 4147.09 4300.19 4560.89 20,450 273.530 4236.67 4389.77 4655.05 20.740 272.550 4324.81 4477.91 4750.24 21,270 272.900 4413.67 4566.77 4845.05 21.400 273.890 4501.99 4655.09 4940.28 21,300 273.520 4590.68 4743.78 5034.75 21,540 273.140 4678.63 4831.73 5129.63 21.640 273.030 4766.85 4919.95 5224.87 21,410 271,000 4855,45 5008.55 5318.53 21.280 270.950 4942.68 5095,78 5414.06 21.080 272.740 5031.76 5184.86 5508.65 20.170 274.670 5120.29 5273.39 5603.37 21.000 271.080 5208.96 5362.06 5697.96 20.360 271.120 5297.46 5450.56 5792.59 19.850 271.840 5386.32 5539.42 20.80 N 645.81W 20.81 N 680.78W 21.29 N 715.22W 21.55 N 749.77W 21.97 N 783.65W 22.47N 816.16W 23.00 N 848.28W 23.47 N 880.64W 24.67 N 912.81W 26.85 N 945.51W 28.80 N 978.14W 30.84N 1011.47W 32.59 N 1044.55W 34.21 N 1078.63W 36.26 N 1113.06W 38.50 N 1147.66W 40.50 N 1182.10W 42.38 N 1216.96W 43.61N 1251.88W 44.19 N 1285.97W 45.30 N 1320.46W 47.44N 1353.71W 49.09 N 1386.95W 49.73 N 1420.35W 50.57 N 1452.87W Dogleg Rate (°/100ft) 5911876.30 N 459775.17 5911876.49 N 459740.20 5911877.15 N 459705.76 5911877.59 N 459671.21 5911878.19 N 459637.34 0.28 1.29 0.10 0.39 1.23 5911878.86 N 459604.83 5911879.56 N 459572.72 5911880.20 N 459540.36 5911881.56 N 459508.19 5911883.91 N 459475.50 0.66 0.52 0.60 1.57 0.33 5911886.03N 459442.89 5911888.25 N 459409.56 5911890.17 N 459376.50 5911891.97 N 459342.42 5911894.20 N 459308.00 0.29 0.02 0.48 0.57 0.40 5911896.62N 459273.42 5911898.80 N 459238.99 5911900.86 N 459204.13 5911902.28 N 459169.22 5911903.04 N 459135.14 0.18 0.29 0.11 0.82 0.14 5911904.33N 459100.65 5911906.64 N 459067.42 5911908.46 N 459034.18 5911909.28 N 459000.79 5911910.29 N 458968.28 E 0.71 E 1.20 E 1.59 E 0.68 E 0.6O RECEIVED OCT 12 000 Alaska State Plane 4 Kuparuk 2N Vertical Section Comment 646.14 681.o9 715.53 750.06 783.93 816.44 848.56 880.91 913.11 945.86 978.54 1011.93 1045.o5 1079.16 1113.65 1148.30 1182.79 1217.7o 1252.64 1286.72 1321.24 1354.54 1387.82 1421.22 1453.75 Continued... 5 October, 2000 - 14:59 -4- Nas Oil,& Gas Commissio DrillQuest ZOO. 02 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Ref: API.501032034500 Job No. AKMMO0169, North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 5887.75 19.140 270.980 5476.03 5629.13 51.36 N 1484.61W 5972.14 18.690 270.270 5555.86 5708.96 51.66 N 1511.97W 6043.00 18.690 270.270 5622,98 5776.08 51.76 N 1534.67W Global Coordinates Northings Eastings (ft) ~(ft) 5911911.24 N 458936.53 E 5911911.68 N 458909.18 E 5911911.91N 458886.48 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 272.060° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 6043.00ft., The Bottom Hole Displacement is 1535.55ft., in the Direction of 271.932° (True). Dogleg Rate (°/100fl) 0.80 0.60 0.00 Alaska State Plane 4 Kuparuk 2N Vertical Section Comment 1485.50 1512.85 1535.54 Projected Survey Comments Measured Depth (fi) 6043.00 Station Coordinates TVD Northinga Easting$ Comment (ft) (ft) (fi) 5776.08 51.76 N 1534.67 W Projected Survey RECEIVED OCT 12 2000 Continued... 5 October, 2000 - 14:59 -5- DrillQuest 2. 00. 02 Sperry-Sun Drilling Services Survey Report for 2N-349 Your Ref: AP1.501032034500 Job No. AKMMO0169, North Slope Alaska Survey tool program From Measured Vertical Depth Depth (ft) 0.00 0.00 To Measured Depth (ft) 6043.00 Vertical Depth (ft) 5776.08 Survey Tool Description MWD Magnetic Alaska State Plane 4 Kuparuk 2N 5 October, 2000 - 14:59 RECEIVED ..6- DrillQuest 2.00.02 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: Abandon _X Suspend _ OperationaJ shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _ Other _ Change approved program _ Pull tubing _ Variance _ Perforate _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) Phillips Alaska, Inc. Development_X RKB 35 feet 3. Address Exploratory _ 7. Unit or Property name P. O. Box 100360 Stratigraphic_ Anchorage, AK 99510-0360 ser~ce_ Kuparuk River Unit 4. Location of well at surface 8. Well number 158' FNL, 1172' FEL, Sec. 3, T9N, R7E, UM (ASP: 460421, 5911852) 2N-349 At top of productive interval 9. Permit number / approval number 110' FNL, 2536' FEL, Sec. 3, T9N, R7E, UM (per APD) 200-111 At effective depth 10. APl number 50-103-20345-00 At total depth 11. Field / Pool 103' FNL, 2566' FWL, Sec. 3, T9N, R7E, UM (per APD) Kuparuk River Field/Kuparuk Oil Pool 12. Present well condition summary Total depth: measured 6043 feet Plugs (measured) open hole plugs 6043'-4700' true vertical 5776 feet cement kick-off plug from 2795'-2495' Effective depth: measured 6043 feet Junk (measured) true vertical 5776 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 83' 16" 9 cu. Yds High Early 118' 118' Surface 2295' 7.625" 430 sx AS III L, 240 sx Class G 2330' 2317' Intermediate Production Perforation depth: measured N/A SEP 20 2000 0 RIG INA L true vertical N/A Anch0m§e Tubing (size, grade, and measured depth N/A Packers & SSSV (type & measured depth) N/A 13. Attachments Description summary of proposal sX Detailed operations programs BOP sketch _ 14. Estimated date for commencing operation 15. Status of well classification as: September 11, 2000 16. If proposal was verbally approved 9/10/00 Oil __X Gas __ Suspended __ Name of approver Blair Wondzell Date approved Service ~ 17. I hereb~ certi/y that the foregoing is true and correct to the best ot my knowledge. Questions? Call Tom Brassfield265-6377 Signed ~.~ I /~.,...,..,~;i~~ Title: Drilling Engineering Supervisor Date I,.,~L _~."~~ ., ~'~ Prepared b~/ Sharon AIIsu~-Dra'ke FOR COMMISSION USE ONLY --, Conditions of approval: Notify Commission so representative may witness I Approval no. .'3 ,,, ,"" Plug integrity ~ BOP Test ~ Location clearance -- Mechanical Integrity Test __ Subsequent form required lo- ORIGINAL SIGNED BY Approved by order of the Oommission D Tavlor Seamount Oommissioner Date Form 10-403 Rev 06/15/88 · SUBMIT IN TRIPLICATE Tarn 2N-349 Injector Open Hole P&A Schematic Conductor 16' 62.5# H-40 (118' MD / 118' TVD) Surface csg. 7 5/8" 29.7# L-80 BTCM (2330' MD / 2317' TVD) 17.0 ppg 'G' cement Kick-off plug bbl high-vis LSND Mud All Depths Nabors 19E RKB Reference 9.6 ppg LSND Mud Production open hole: 6-3/4" TD @ (6043' MD / 5775' TVD) 15.9 ppg 'G' cement PHILLIPS Alaska, Inc. A Subsidiary of PHILLIPS PETROLEUM COMPANY APl#: 50-103-20345-00 Permit # 200-111 RKB: 153' 16 bbl plug laid in from 2700' - 2400' MD. RECEIVED 62.5 bbl balanced plug laid in 3 stages from 6043' - 4700' M D. BDN 9/13/00 KRU 2N-349 A Sidetarck Current wellbore s( ~s: Surface casing was set at 233( ..... ,D with full returns to surfac~. Production hole was drilled to 6043' MD and it was determined that the Bermuda interval did not meet the Phillips minimum net pay cut-off criteria. The Geologists picked the Bermuda interval from 5500' to' 5550' MD and noted a 4' sand stringer at 4990' MD. An open hole cement plug was spotted from TD to 4700' MD, and a 300' cement kick-off plug was set from 2795' to 2495' MD. The intent is to sidetrack the wellbore to a new bottom hole location approximately 834' west of the current BHL as follows: RECEIVED JUL-2?-O0 THU 02:58 PM I II AOGO~ ' 07/28/00 05: @~A NO, 90? 270 P. IBOS 05/10 AIASiA OIL AND GAS CO~SgRVATIO~ CO~I)llSSIO! TONY KNOW, ES, C~/E~ 300! PORC:UPINE DI~IVE pHONE; (q07) 279-1433 FAX: ('9~ 2?0-7542 ,lames'Trantham Drilling Engineering Supervisor Phillips Alaska, Inc. P O Box 100360 Anchm'agc, AK 99510-0360 Kupamk River Unit 2N-349 Phillips Alaska, Inc. Permit NO: 200-1'Il Sur Loc: 158'FNl.,, 1172'FEI,, Sec. 3, T9N, R7E, 'UM Btmhole Loc, IO3'FNL, 2566'FW1.,, Sec. 3. T9N, R7E, UM Doar 'Mr. Trantham: Enclosed is the approved application rot permit to drill the above referenced well, The permit to drill doe,~ no~ exempt you from obtaining additional permits required by law .from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a repres~ntativ~ of thc Commission to witness a test of BOPE installed prior to drilling new hole, Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager al 659-3607, Sincerely, Daniel T. Seamount~ Jr. Commissioner Bit' O'RDER OF THE COMMISSION . DATED this 7¢/__~ f,'/ day of July, 2000 dlf/Enclosuros IJepartm~nl of Fisll & Oame, 1 Iabilta gecl'im~ w/o encl. Oeparln~t of gnviromn~lal Conservation w/o cnoi. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work: Drill ~ ~,,, I-I I ~. Type ot well. Exploratory D Stratigraphic Test D Development Oil j~J Re-entry r-1 Deepen J--1J Service J--J Development Gas O Single Zone J=~J MuJtJpJe Zone D 2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool Phillips Alaska, Inc. RKB 35 feet 3. Address 6. Property Designation Kuparuk River Field P.O. Box 100360 Anchorage, AK 99510-0360 ADL 375074 ALK 4293 Tarn Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 2O AAC 25.0251) 158' FNL, 1172' FEL, Sec. 3, T9N, R7E, UM Kuparuk River Unit Statewide At top of productive interval 8. Well number Number 110' FNL, 2536' FEL, Sec. 3, T9N, R7E, UM 2N 349 #U-630610 At total depth 9. Approximate spud date Amount 103' FNL, 2566' FWL, Sec. 3, T9N, R7E, UM July 28, 2000 $200,000 12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ~~~i~103'@ TD feet 2N-347 17.8' @ 671' feet 2560 6032' MD / 5757'TVD 16. To be completed for deviated wells 17; Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth: 1600 MD Maximum hole angle 21.36 Maximum surface 1870 psig At total depth (TVD) 2400 psig 18. Casing program Settin~l Depth size Specifications Top Bottom Quantib/of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD tinclude sta~le data/ 24" 16" 62.5# H-40 Weld 83' 35' 35' 118' 118' 9 cy High Early 9.875" 7.625" 29.7# L-80 BTCM 2284' 35' 35' 2319' 2300' 260 sx AS III L & 240 sx Class G 6.75" 5.5"x 15.5# L-80 LTC Mod 5244' 35' 35' 5279' 5057' 550 sx Class G 6.75" 3.5" 9.3# L-80 8rd EUE 753' 5279' 5057' 6032' 5757' see above 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total Depth: measured feet Plugs (measured) tree vertical feet Effective Depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Conductor Surface IntermediateRECEIVED Production 0RI01 I/[ 000 Pedoration depth: measured Alaska 0il & Gas Coils, Commission true vertical 20. Attachments Filing fee ~1 Property Plat F1 BOP Sketch [] Diverter Sketch [~] Ddlling program Drilling fluid program [~] Time vs depth plot I'"'lRefraction analysis I-"l Seabed repo. r'-I 20 AAC 25.050 requirements r'-I 21. i hereby certify that the foregoing is true and correct to the best of my knowledg~ Ooest[on$? Call Torn Bms$fielc1265-657; Signed J '"'T~ ~,~~.~,~. Title: DrillingEngineeringSupervisor Date ' ,~' J ,,,,~1, 'Z"~,) James Trantham ~ ~ ~ Prenared bv Tom Brassfielc Commission Use Onl~ r,.,.be,' ,,o,'o,,',err,,¢rer, r, er,, ~ -- / / / 501 /0 ,-~ Approv~J.~ate ISee coverlotter Conditions or approval Samples required D Yes ,J~ No Mud logrequired D Yes ~ No Hydrogen sulfide measu res DYes ~, No Directional survey required ~ YesD No Required working pressure for BOPE D 2M; ORIGINAL SIGNED BY by order of Approved by r~ T~,,~,,, o,.,,-,,,~,-~, ,n~ Commissioner the commission Date ......... Form 10-401 Rev. 12/1/85 · Submit in triplicate Well Proximity Risks: Phillips Alaska, Inc. JUL 20 2000 Alaska ~; & ~s Cons. Commission /~flora[le The nearest well to 2N-349 is 2N-347. The wells are 17.8' from each other at a depth of 671' MD. This well does meet with the Phillips ellipse separation criteria. Drillinq Area Risks: One identified risk in the Tarn 2N-349 drilling area is the shallow gas hydrates below the permafrost. To date the hydrates encountered while drilling the Tarn Phase 3 wells 2N 347, 2N 332, & 2N 316 have been minimal. Standard SOP's have been developed to minimize the hydrate impacts i.e. maintaining Iow mud viscosities, pre-treating with Driltreat (Lecithin) and Dril-N-Slide, using cold make-up water for the mud, control drilling, and optimized flow rates. The surface hole will be drilled with weighted mud (9.5 - 10.2 ppg) to avoid underbalancing the hole. Another observed problem in the area is possible lost circulation at approximately 3,300' TVD and in the Tarn formation. Analysis of pressure data from offset wells shows that a mud weight of 9.0-10.0 ppg will provide sufficient overpressure to safely drill, trip pipe, and cement the well through the reservoir. The 7-5/8" casing shoe will be tested to leak-off, or to a maximum equivalent mud weight of 16.0 ppg upon drilling out of the casing. Recent information has indicated the possibility of gas migration from the reservoir to a shallower sand interval. However, NO overpressured zones were encountered while drilling 2N-347 or 2N-332 wellbores. Log, tracer, pump-in test, and offest BHPBU evaluations indicate migration has not occurred outside of the wellbore interval and is most likely isolated below the TOC and/or below the Iceberg interval. In the event gas migration has occurred into the Iceberg interval at 4303' TVD, the highest required MW would be 10.7 ppg. Annular Pumping Operations: Incidental fluids developed from drilling operations wilt be either injected into an approved annulus on the same pad or hauled to the nearest permitted Class II disposal well. (Note that cement rinseate will not be injected down the dedicated disposal well but will be recycled or held for an open annulus.) The open annulus will be left with a non-freezing fluid during any extended shut down (> 4 hr) in pumping operations. The 2N-349 surface/production casing annulus will be filled with diesel after setting production casing and prior to the drilling rig moving off of the well. If isolation is required per regulations over significant hydrocarbons, then sufficient cement volume will be pumped during the production cement job to cover those formations. Following drilling operations, Phillips Alaska, Inc. will submit application for approval of 2N-339 for annular pumping of fluids occurring as a result of drilling operations, per regulation 20 AAC 25.080. Any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set in the Cretaceous shales below the base of the West Sak Sands. These 300-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow. The surface casing shoe will be set a minimum of 200' vertically below the base of the West Sak into the heart of the shales. Phillips Alaska, Inc. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2,300') + 1,500 psi Max Pressure = 2,935 psi This pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and production casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85% of 85% of OD (ppf) Grade Range Type Collapse iCollapse Burst Burst 7-5/8" 29.7 L-80 3 BTC 4,790 psi 14,072 psi 6,450 psi 5,483 psi 5~" 15.5 L-80 3 LTC-Mod 4,990 psi 4,242 psi 7,000 psi 5,950 psi 3Y=" 9.3 L-80 2 8rd EUE Mod 10,530 psi 8,951 psi 10,160 psi 8,636 psi Fluids to be disposed of in the annulus will be limited to drilling wastes associated with drilling a well as defined in 20 AAC 25.080 (h). RECEIVED JUL 20 000 Alaska 0[-~ & Gas Cons. Commission Anchorage ( Phillips Alaska, Inc. ( GENERAL DRILLING AND COMPLETION PROCEDURE KUPARUK RIVER FIELD - PRODUCER/Injector KRU 2N-349 1. Move in and rig up Nabors 19e. 2. Install diverter system. . , . . , Drill 9.875" hole to 7-5/8" surface casing point according to directional plan. Run open hole logs for USGS. Run and cement 7-5/8" 29.7#, L-80 BTC-Mod casing string to surface. Employ lightweight permafrost cement lead slurry to assure cement returns to the surface. Adequate excess cement will be pumped to ensure cement reaches the surface. If cement does not circulate to surface, a Top Job will only be performed after consulting with the AOGCC. Install and test BOPE to 3,500 psi. Test casing to 2,000 psi. Drill out cement and 20' of new hole. Perform formation integrity test not to exceed 16.0 ppg EMW. This establishes a maximum allowed drilling mud weight below the casing shoe per 20 AAC 25.030 (0.5 ppg less than the FIT or LOT EMW). Drill 6-3/4" or 6-1/2"x7-1/2" hole to TD according to directional plan. Run LWD logging equipment with density and porosity tools. Note: If significant hydrocarbon zones are present above the Tarn, sufficient cement will be pumped for isolation in accordance with 20 AAC 25.030(d)(3)(C). Run and cement 5-1/2" L-80 LTC Csg X 3-1/2" L-80 8rd EUE-Mod tapered production casing string with Baker casing seal receptacle at crossover point. 9. Pressure test casing to 3,500 psi. 10. Run 3-1/2" L-80 8rd EUE-Mod completion assembly. Sting into polished seal bore with seal assembly and pressure test tubing and annulus to 3,500 psi. 11. Set TWC, ND BOPE and install production tree. 12. Secure well. Rig down and move out. 13. Handover well to Operations Personnel. RECEIVED JUL 2 0 000 Alaska 0[-~ & Gas Cons. Commission Anchorage . LEAK OFF TEST PROCEDURE Tarn After cementing casing and nippling up BOPE, RIH to top of cement and pressure test the casing to 2000 psi for 30 minutes and record on chart (AOGCC required casing integrity test). Record the information on the PAl LOT form (you can locate on the drilling web page). PIct Casing Pressure Test (volume vs. pressure and time holding pressure on casing). Verify that the test indicates a linear line and that there is no air entrained in the mud. Repeat Casing pressure test if needed. 2. Drill 20' to 50' of new hole below the casing shoe. , Circulate the hole to establish a uniform mud density throughout the system (required for a good FIT or LOT). PU into the shoe. 4. Close the blowout preventer (ram or annular). 5. Pump down the drill stem at 1/4 to 1/2 bpm. . . On the LOT form, plot the fluid pumped (volume or strokes) vs. drill pipe pressure until the formation begins to take fluid; at this point the pressure will continue to rise, but at a slower rate. Note: If 16.0 ppg EMW is reached, shut down and hold the pressure there. This becomes the data for a formation integrity test (FIT) instead of a LOT At leak off pump 3 bbls of mud into formation prior to shutting down the pump. Shut down when the leak-off point is clearly seen and 3 bbls of mud has been pumped into the formation. Record initial shut-in pressure. With the pump shut down monitor, record and report the shut -in pressures for a minimum of 10 minutes or until the shut -in pressure stabilizes. Record time vs. pressure in 1-minute intervals and plot information. Bleed the pressure off and record the fluid volume recovered. Forward the data to the Drilling Engineer in Anchorage. The Drilling Engineer will forward the information to the Agencies. RECEIVED ,JUL 2 0 2000 Alaska Oil; & Gas Cons. Commission Anchorage TJB 5/19/00 Phillips Alaska, Inc.('' DRILLING FLUID PROGRAM, PRESSURE CALCULATIONS, AND DRILLING AREA RISKS Well KRU 2N-349 Drillinc~ Fluid Properties: Density PV YP Funnel Vis Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to surface casin~l point 9.5-10.2 ppg 16-26 25-35 50-120' 10-20 15-40 7-15 9.5-10 _+10% Drill out to TD 9.0 - 11.0 ppg 6-20 5-20 35-50 2-6 4-8 <6 through Tarn 9.0-10 <11% RECEIVED ,JUL 2 0 ~000 Alaska 0~; & Gas r¢o~s, uommission Anchorage Drillinc~ Fluid System: Triple Derrick Shale Shakers Desander, Desilter, Mud Cleaner Centrifuge Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators *Spud mud should be adjusted to a FV between 100-120 sec/qt to drill gravel beds Drilling fluid practices will be in accordance with the regulations stated in 20 AAC 25.033. Maximum Anticipated Surface Pressure: Maximum anticipated surface pressure (MASP) while drilling the production hole is calculated using a reservoir pressure of 2400 psi at a target mid-point of .5303' TVD. Gas gradient is anticipated to be 0.1 psi/ft. Using this data, the MASP is calculated to be: MAS P=((2400/5303)-0.1 )*5303 MASP=1870 psi Therefore PAl will test the BOP equipment to 3500 psi after setting surface casing. Based on offset well data, reservoir pressures in the Tarn sands in the vicinity of 2N pad are expected to be -2,400 psi (0.49 psi/ft). Assuming a 150 psi overbalance is required to safely drill and trip in this formation, then a required mud weight of 9.25 ppg can be predicted as the maximum mud weight needed to safely drill in this formation, assuming a TVD of 5303'. Target (Midpoint T2 T3) (2400+150)/(0.052'5303)=9.25. 400 800 1200 1600 ~ 2000 q.,. 2400 36OO 400O 4400 4800 5200 5600 6OO0 RKB ELEVATION: 155' Begin D'nl Nudge t .50 5.00 4.50 DLS: 1.50 deg per 100 ft 6.00. . 6.00 uegm Drop 4.50 ~.00 Par[ Collar 1.50 DLS: 1.50 deg per 100 Bose Permafrost End D'nl Nudge Top W Sak KOP 3.00 6.00 DLS: 5.00 deg per 100 ft 9.00 Base W Sak 12.00 15.00 8.00 21.00 EOC p SS II~ C50 C40 eberg TTarget Mid Bermudo~rT~;~T21 , C55 TD - Casing Pt o 400 600 ,200 ~oo 2000 Verfical Secfion (feel) -> AzlmuJh 272.06 wlfh referono® 0.00 N, 0.00 E from slot I PHILLIPS Alask Inc. a, Structure: Tarn Drill Site 2N Well: Field: Tarn DeVelopment field Looaflon: North Slope, Alaska <- WeSt (feet) 1600 1500 1400 1300 1200 1100 1000 g00 800 700 600 500 400 ;500 200 100 0 100 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 100 I v 2O0 TD LOCATION: I 105' FNL, 2566' FWL SEC. 5, T9N, R7E TARGET LOCATION: 10' FNL, 2556' FEL SEC. 3, T9N, R7E SURFACE LOCATION: 158' FNL, 1172' FEL SEC. 5, T9N, R7E AVERAGE ANGLE 21.36 DEG 272.06 AZIMUTH 1365' (TO TARGET) RECEIVED ,JUL 2 0 2000 Naska CX-; & Gas Cons. ~;ommission Anchorage C~bd b~ .,,ch For: T Braeefleld J Dote plofl~d: 17-~1-2000 I IPHILLIPS Alaska, Inc.I Struoiur~: Torn Drill ~lto 2N Well: field: Tom Development Fleld Looatlon: North Slope, ~,~ko RECEIVED JUL 2 0 2000 Alaska Or; & Gas Cons. Commission An~orage PROFILE COMMENT DATA Point Begin D'nl Nudge Begin Drop Port Collar Bose Permofrost End D'nl Nudge Top W Sok KOP Base W Sak EOC 7 5/8 Cosing C80 Comp SS C50 C40 C37 Iceberg T7 T5.1 T3 Target Mid Bermuda T2 C35 TD - Casinq Pt MD 300.00 766.66 1002.18 1205.32 1253.32 1250.52 160O.00 1955.04 2311.96 2319.19 2496.56 2542.53 3949.14 4158.52 4589.58 4469.91 5O 17.52 5393.33 5479.23 5545.65 5591.97 5731.56 6031.56 Inc Dir TVD North 0.00 272.06 300.00 0.00 7.00 272.06 765.50 1.02 5.47 272.06 1000.00 1.79 0.42 272.06 1205.00 2.04 0,00 272.06 1231.00 2.04 0,00 272.06 1248.00 2.04 0.00 272.06 1597.68 2.04 10.05 272.06 1951.00 5.10 21.56 272.06 2295.26 6.75 21.56 272.06 2500.00 6.85 21.56 272,06 2465.00 9,16 21.56 272.06 2508.00 9.77 21.56 272.06 5818.00 28.15 21.56 272.06 4015.00 50.89 21.56 272.06 4228.00 55.91 21.56 272.06 4503.00 54.96 21.56 272,06 4815.00 42.12 21.56 272.06 51 65.00 47.03 21,56 272,06 5245.00 48.1 6 21.56 272.06 5505.00 49.00 21.56 272.06 5548.00 49.65 21.56 272.06 5478.00 51.45 21.36 272.06 5757.40 55.58 East 0.00 -28.45 -49.92 -56.80 -56.91 -56.91 -56.91 -86.20 - 188.00 -190.63 -255.11 -271.92 -785.88 -860.09 -944.12 -975.45 - 1172.74 - 1509.55 - 1540.79 - 1564.24 -1581.85 - 1432.63 - 1541.85 V. Sect 0.00 28.47 49.95 56.84 56.94 56.94 56.94 86.26 188.12 190.75 255.28 272.09 784.39 860.65 944.75 974.06 1175.50 1510.57 1541.66 1365.12 1582.72 1453.56 1542.82 Deg/1 O0 0.00 1.50 1.50 1.50 1.50 0.00 0.00 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 For: ? Br&ssfleldl .,, ,I 2 0 2000 PHILLIPS Alaska, Inc. Structure: Tam Drill Site 2N Well: ;549 Field: Tarn Development Field Looatlon: North Slope, Alaska An~or~e 320 TRUE NORTH 350 o,,u- .... 50O 10 2O 30 '~ 4O 3( 290 - 50 100 280 80 270 90 260 100 250 110 240 220 210 190 120 lO0 130 140 150 180 60 Normal Plane Travelling Cylinder - Feet All depths shown are Measured depths on Reference Well P H I____LLI___~P S_ _Al a__~s k___a ,_ I_nc. Sh'uc~ure: Torn Dr~ll $~te 2N Well: ff~9 field: Torp Development field Loec~tlon: North Slope, AIoIkQ A I 40 ~_ 20 ,4-- ~- 0 0 Z tc~ ~ ~c~ For: T ]~raesfleld [ <- West (feet) ~0 ~60 ~0 ~0 ~ 2~ 2~ 240 ~0 2~ I ~4~ ~00 ~ 12 O0 ~___ ?o ~6~ ~oo 240O 20 RECEIVED ~ ~ ~ka ~ ~~om~~a* Con,. Comml~oa 120 ........ , , , 120 <- Wesf (feet) '~-.~600 3OO ~ I 2200 21 O0 2000 1900 1200 goo ......... '~_~2_.,_.o_o__z_~_oo~_~_ _ _~oo ~ ~ '"" [ 20 /% 40 I Z 0 20 ZTi. 40 240 200 160 120 ~D 4O N,.- c" 0 O t~ 40 I v 81:) 120 160 2OO 240 28O Ik3tm plotted: 17.-~1-2000 I PHILLIPS Alaska, Inc. Sfructure: Torn Drill Site 214 Well: 5~9 Field: Torn Development Field I.oeefton: North Slope, Aleske <- Wesi' (feet) 1080 1040 1000 960 920 880 840 800 760 720 680 640 600 560 520 480 440 400 360 ~20 280 240 I I I I I I I I I I I I I I I I I I I I I I I I I I f I I I I I I I I ~ ~ ~ ~ J I J ~ 1800 jsoo 1700 1500 ~ ' 1400 16oo ~ ~ 1500 1400 1500 ~ _ _ ~4500 4400 4300 4200 4100 4000 5900 3800 3700 3600 3500 ~500 3500 3200 ~100 3000 2900 2800 2700 2600 2500 ~ ~- .-e .... .___.________.___.________.___. .... e- ...... _~ .... .- ...... -~ .... "- -- - ~- ~- --4- - _ _.. ..... RECEIVED JUL 2 0 2000 Alaska 0;~ & Gas teas. Commission Anchorage 2100 2200 2000 1700 ~ __..__.-.-~---~soo ~ 14oo 1900 ~ i i ! i i i ! i i ! i i i i i i i i i i i i ! i i i i i ! i i i i i i I i i ! i 1080 1040 1000 960 920 880 840 800 760 720 680 640 600 560 520 480 440 400 360 320 <- West (feet) i ! i 240 2OO 160 120 40 O r- -4- 0 -4- 40 I ¥ 120 160 2OO 240 28O 120 80 40 320 280 240 200 160 0 40 80 120 160 1760 1720 IPHILLIPS Alaska, Inc. Structure: Torn Drill SHe 2N Well: ~ Field: Tarn Development Field Location: Norlh Slop4, Alaska <- West (feel) 1760 1720 1680 1640 1600 1560 1520 1480 1440 1400 1560 1320 1280 1240 1200 1160 1120 1080 1040 1000 960 920 880 3~0 II II II II II II II II II II II fI ~I I~ J ! I I I I II II I I I I I 560 ~ 2000 ~ 1900 1800 ~ 1800 ~ 1700 ~ ~700 ~r~o ~500 54oo 5300 ?00 5100 se00 4900 4800 4?oo ~600 4500 oo 4300 4200 1400 1560 1520 1280 1240 1200 1160 1120 <- West (feel) 320 28O 240 2OO 160 120 80 4O 0 4O 80 120 160 i i i i i i i i ~ i 1080 1040 1000 960 920 880 RECEIVED ,JUL 2 0 2000 Alaska 0;'~ & Gas Cons. Commission Anchorage i i ! i i i i i i ! ! ! ! 1650 1640 1600 1560 1520 1480 1440 z o PHILLIPS Alaska, Inc. Tarn Drill Site 2N 349 slot #349 Tarn Development Field North Slope, Alaska SUMMARY CLEARANCE REPORT by Baker Hughes INTEQ Your ref : 349 Version #3 Our ref : prop3920 License : Date printed : 17-Jul-2000 Date created : 22-Mar-2000 Last revised : 17-Jut-2000 Field is centred on n70 12 49.742,w150 18 33.414 Structure is centred on n70 10 13.955,w150 18 32.772 Slot location is n70 10 12.408,w150 19 6.719 Slot Grid coordinates are N 5911852.085, E 460420.841 Slot local coordinates are 157.20 S 1171.81 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Object wellpath PMSS <0-8500'>,,317,Tarn Drill Site 2N PMSS <8085-8239'>,,339,Tarn Drill Site 2N PMSS <O-10520'>,,308,Tarn Drill Site 2N PMSS <0-8960'>,,307,Tarn Drill Site 2N PMSS <288-8750'>,,309,Tarn Drill Site 2N PMSS <0-7039'>,,319,Tarn Drill Site 2N PMSS <0-11197'>,,315,Tarn Drill Site 2N PMSS <0-12339'>,,341,Tarn Drill Site 2N PMSS <9483 - 9631'>,,343,Tarn Drill Site 2N PMSS <0-7431'>,,345,Tarn Drill Site 2N PMSS <0-9134'>,,313,Tarn Drill Site 2N PMSS <266'-l1061'>,,320,Tarn Drill Site 2N PMSS <0-9690'>,,329,Tarn Drill Site 2N PMSS <0-9553'>,,323,Tarn Drill Site 2N PMSS <0-10655'>,,337PB1,Tarn Drill Site 2N PMSS <7090-10245'>,,337,Tarn Drill Site 2N PMSS <5303 - l1526'>,,321,Tarn Drill Site 2N PMSS <9235 - 10028'>,,32iA, Tarn Drill Site 2N PMSS <10920 - l1225'>,,331,Tarn Drill Site 2N PMSS <7387 - 8182'>,,325,Tarn Drill Site 2N PMSS <O-12077'>,,335,Tarn Drill Site 2N PMSS <O-???'>,,316,Tarn Drill Site 2N PMSS <6209 - 12026'>,,332,Tarn Drill Site 2N PMSS <0-8683'>,,332PB1,Tarn Drill Site 2N PMSS <O-12735'>,,347,Tarn Drill Site 2N Closest approach with 3-D Minimum Distance method Last revised Distance 14-Aug-1998 9-0ct-1998 24-Feb-1999 8-Mar-1999 30-Mar-1999 9-0ct-1998 16-May-2000 30-Sep-1998 28-Feb-2000 21-Ju1-1998 4-Aug-1998 9-Feb-1999 10-May-2000 20-May-2000 27-Jun-2000 27-Jun-2000 29-Feb-2000 21-Dec-1998 10-May-2000 21-Dec-1998 27-0ct-1998 17-Jul-2000 13-Jul-2000 6-Jul-2000 7-Jun-2000 479 8 149 9 615 1 628 9 599 1 397 4 462 0 116 0 84 9 39 3 536 7 322 4 179 5 319 3 177 8 177 8 405 2 405 2 137 6 296 0 210 1 464 3 81 3 81 3 17 8 314 3 2O 0 0 0 328 6 300 0 1900 0 1162 1 657 1 726 7 1061 9 542 8 1580 0 1320 0 1162 1 685 7 685 7 1061 9 1061 9 1190 9 1833 3 0 0 1260 0 1240 0 1240 0 671 4 Diverging from M.D. 1580.0 20.0 0.0 328.6 1300.0 1900.0 1162.1 657.1 726.7 6031.6 542.8 1580.0 1320.0 1162.1 685.7 685.7 1061.9 1061.9 1190.9 1833.3 2133.3 1260.0 1240.0 1240.0 671.4 RECEIVED JUL 2 0 2000 Alaska Oi-~ & G~.s Cons. Commission Anchorage INTEQ Internal Use ONLY! Safety Criteria Applied: 1.5% * MD fr 3333' MD, 50' thereafter. Safety Criteria violation indicated by \__~GER! . Warning Criteria Applied: 0.005 * MD. Warning Criteria violation indicated by 'Warning!'. PHILLIPS Alaska, Inc. Tarn Drill Site 2N 349 slot #349 Tarn Development Field North Slope, Alaska 3-D MINIMUM DISTANCE CLEARANCE REPORT INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : 349 Version #3 Our ref : prop3920 License : Date printed : 17-Jul-2000 Date created : 22-Mar-2000 Last revised : 17-Jul-2000 Field is centred on n70 12 49.742,w150 18 33.414 Structure is centred on n70 10 13.955,w150 18 32.772 Slot location is n70 10 12.408,w150 19 6.719 Slot Grid coordinates are N 5911852.085, E 460420.841 Slot local coordinates are 157.20 S 1171.81 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* Object wellpath 305 Version #1, PMSS <0-8500'>, PMSS <8085-8239'> PMSS <0-10520'>, PMSS <0-8960'>, PMSS <288-8750'> PMSS <0-7039'>, PMSS <0-11197'>, PMSS <0-12339'>, 305,Tarn Drill Site 2N 317,Tarn Drill Site 2N ,339,Tarn Drill Site 2N 308,Tarn Drill Site 2N 307,Tarn Drill Site 2N ,309,Tarn Drill Site 2N 319,Tarn Drill Site 2N 315,Tarn Drill Site 2N 341,Tarn Drill Site 2N PMSS <9483 - 9631'>,,343,Tarn Drill Site 2N PMSS <O-7431'>,,345,Tarn Drill Site 2N PMSS <0-9134'>,,313,Tarn Drill Site 2N Closest approach with 3-D Minimum Distance method Last revised Distance 25-Feb-2000 658.5 14-Aug-1998 9-Oct-1998 24-Feb-1999 8-Mar-1999 30-Mar-1999 9-0ct-1998 16-May-2000 30-Sep-1998 28-Feb-2000 21-Ju1-1998 477.7 149.7 614.5 627.1 597. 367. 443. 111. )79. )31. 4-Aug-1998 )533.2( 620 INTEQ Internal Use ONLY! M.D. 314.3 1620.0 60.0 200.0 342.9 320.0 1995.0 1190.9 70O.O 740.0 1061.9 .0 Diverging from M.D. Req'd Sep. Status 314.3 4.7 OK 1620.0 24.3 OK 571.4 0.9 OK 2OO.O 3.O OK 342.9 5.1 OK 1340.0 4.8 OK 1995.0 29.9 OK 1190.9 17.9 OK 700.0 10.5 OK 740.0 11.1 OK 6039.1 15.9 OK 1002.2 9.3 OK RECE!VED ,JUL 2 0 2000 Alaska Oii& Gas Cons. Commission Anchorage PMSS <266'-l1061'>,,320,Tarn Drillf 4' 2N PMSS <0-9690'>,,329,Tarn Drill Sit% ~N PMSS <0-9553'>,,323,Tarn Drill Site 2N PMSS <O-12735'>,,347,Tarn Drill Site 2N 322 Version #31,,322,Tarn Drill Site 2N PMSS <0-10655'>,,337PB1,Tarn Drill Site 2N PMSS <7090-10245'>,,337,Tarn Drill Site 2N PMSS <5303 - l1526'>,,321,Tarn Drill Site 2N PMSS <9235 - 10028'>,,32iA,Tarn Drill Site 2N PMSS <10920 - l1225'>,,331,Tarn Drill Site 2N PMSS <7387 - 8182'>,,325,Tarn Drill Site 2N PMSS <0-12077'>,,335,Tarn Drill Site 2N 318 Version #6,,318,Tarn Drill Site 2N 314 Version~6,,314,Tarn Drill Site 2N 316 Version #13,,316,Tarn Drill Site 2N PMSS <O-???'>,,316,Tarn Drill Site 2N PMSS <6209 - 12026'>,,332,Tarn Drill Site 2N PMSS <0-8683'>,,332PB1,Tarn Drill Site 2N INTEQ Internal Use ONLY! 9-Feb-1999 10-May-2000 20-May-2000 7-Jun-2000 23-Jun-2000 27-Jun-2000 27-Jun-2000 29-Feb-2000 21-Dec-1998 10-May-2000 21-Dec-1998 27-0ct-1998 29-Jun-2000 17-Jul-2000 11-Jul-2000 17-Jul-2000 13-Jul-2000 6-Jul-2000 )297 )157 )297 )13 184 173 173 395 395 126 277 204 401 485 446 447 )61 )61 1600.0 1340.0 1200.0 671.4 1440.0 700.0 700.0 1100 0 1100 0 1190 9 1840 0 2250 6 1380 0 1280 0 1320 0 1300 0 1240 0 1240 0 ~40 0 1200 0 671 4 1440 0 700 0 700 0 1100 0 1100 0 1190 9 1840.0 2250.6 1380.0 1280.0 1320.0 1300.0 1240.0 1240.0 24 0 20 1 18 0 10 1 21 6 10 5 10 5 16 5 16 5 17 9 27 6 33 8 20 7 19 2 19.8 19.5 18.6 18.6 OK OK OK Warning! OK OK OK OK OK OK OK OK OK OK OK OK OK OK RECEIVED INTEQ Internal Use ONLY! ,JUL 2 0 2000 Alaska 0[{ & Gas Cons, Commission Anchorage PHILLIPS Alaska, Inc. Tarn Drill Site 2N 349 slot #349 Tarn Development Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 349 Version #3 Our ref : prop3920 License : Date printed : 17-Jut-2000 Date created : 22-Mar-2000 Last revised : 17-Jul-2000 Field is centred on n70 12 49.742,w150 18 33.414 Structure is centred on n70 10 13.955,w150 18 32.772 Slot location is n70 10 12.408,w150 19 6.719 Slot Grid coordinates are N 5911852.085, E 460420.841 Slot local coordinates are 157.20 S 1171.81 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North PHILLIPS Alaska, Inc. Tarn Drill Site 2N,349 Tarn Development Field,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C 00 R D I N A T E S 0.00 0.00 272.06 0.00 0.00 N 0.00 E 300.00 0.00 272.06 300.00 0.00 N 0.00 W 399.99 1.50 272.06 399.98 0.05 N 1.31 W 499.99 3.00 272.06 499.90 0.19 N 5.23 W PROPOSAL LISTING Page 1 Your ref : 349 Version #3 Last revised : 17-Jul-2000 Dogleg Vert Deg/100ft Sect 0.00 0.00 1.50 1.50 0.00 0.00 Begin D'nl Nudge 1.31 5.24 RECEIVED ,JUL 2 0 2000 Alaska Oi'~ & ~as Cons. Commission Anchorage 599.99 699.99 766.66 e33.32 933.32 1002.18 1033.32 1133.32 1205.32 1233.32 1250.32 1500.00 1600.00 1700.00 1800.00 1900.00 1935.04 2000.00 2100.00 2200.00 2300.00 2311.96 2319.19 2496.36 2500.00 2542.53 3000.00 3500.00 3949.14 4000.00 4158.52 4389.38 4469.91 4500.00 5000.00 5017.52 5393.33 5479.23 5500.00 5543.65 5591.97 5731.56 6000.00 6031.56 4.50 6.00 · 7.00 6.00 4.50 3.47 3.00 1.50 0.42 0.00 0.00 0.00 0.00 3.00 6.00 9.00 10 12 15 18 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 272.06 .05 272.06 .00 272.06 .00 272.06 .00 272.06 .00 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 .36 272.06 599.68 0.42 N 11.77 W 1.50 11.78 699.26 N 20.91 W 1.50 20.93 765.50 N 28.45 W 1.50 28.47 Begin D ~ 831.73 1.29 N 36.00 W 1.50 36.02 931.31 1.62 N 45.14 W 1.50 45,17 1000.00 1.79 N 49.92 W 1.50 49.95 Port Collar 1031.09 1.86 N 51.68 W 1.50 51.71 1131.01 2.00 N 55.60 W 1.50 55.63 1203.00 2.04 N 56.80 W 1.50 56.84 Base Permafrost 1231.00 2.04 N 56.91 W 1.50 56.94 End D'nl Nudge 1248.00 2.04 N 56.91 W 0.00 56.94 Top W Sak 1497.68 2.04 N 56.91 W 0.00 56.94 1597.68 2.04 N 56.91 W 0.00 56.94 KOP 1697.63 2.14 N 59.52 W 3.00 59.56 1797.31 2.42 N 67.36 W 3.00 67.41 1896.45 2.89 N 80.41 W 3.00 80.46 1931.00 3.10 N 86.20 W 3.00 86.26 Base W Sak 1994.76 3.54 N 98.62 W 3.00 98.68 2091.99 4.38 N 121.94 W 3.00 122.02 2187.86 5.40 N 150.32 W 3.00 150.42 2282.11 6.60 N 183.68 W 3.00 183.80 2293.26 6.75 N 188.00 W 3.00 188.12 EOC 2300.00 6.85 N 190.63 W 0.00 190.75 7 5/8" Casing 2465.00 9.16 N 255.11 W 0.00 255.28 C80 2468.39 9.21 N 256.44 W 0.00 256.60 2508.00 9.77 N 271.92 W 0.00 272.09 Camp SS 2934.05 15.75 N 438.42 W 0.00 438.71 3399.71 22.28 N 620.41 W 0.00 620.81 3818.00 28.15 N 783.88 W 0.00 784.39 C50 3865.37 28.82 N 802.40 W 0.00 802.91 4013.00 30.89 N 860.09 W 0.00 860.65 C40 4228.00 33.91 N 944.12 W 0.00 944.73 C37 4303.00 34.96 N 973.43 W 0.00 974.06 Iceberg 4331.03 35.36 N 984.38 W 0.00 985.02 4796.69 41.89 N 1166.37 W 0.00 1167.12 4813.00 42.12 N 1172.74 W 0.00 1173.50 T7 5163.00 47.03 N 1309.53 W 0.00 1310.37 T3.1 5243.00 48.16 N 1340.79 W 0.00 1341.66 T3 5262.34 48.43 N 1348.35 W 0.00 1349.22 5303.00 49.00 N 1364.24 W 0.00 1365.12 2N-349 Rvsd 17-Jul-00 5348.00 49.63 N 1381.83 W 0.00 1382.72 T2 5478.00 51.45 N 1432.63 W 0.00 1433.56 C35 5728.00 54.96 N 1530.34 W 0.00 1531.33 5757.40 55.38 N 1541.83 W 0.00 1542.82 TD - Casing Pt Ail data is in feet unless otherwise stated. Coordinates from slot %349 and TVD from RKB (Nabors 1gE) (153.00 Ft above mean sea level). Bottom hole distance is 1542.82 on azimuth 272.06 degrees from wellhead. Total Dogleg for wellpath is 35.36 degrees. Vertical section is from wellhead on azimuth 272.06 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ PHILLIPS Alaska, Inc. Tarn Drill Site 2N,349 Tarn Development Field,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 349 Version Last revised : 17-Jul-2000 Comments in wellpath MD TVD Rectangular Coords. Comment ...................................... = .................................................................... 300.00 300.00 766.66 765.50 1002.18 1000.00 1205.32 1203.00 1233.32 1231.00 1250.32 1248.00 1600.00 1597.68 1935.04 1931.00 2311.96 2293.26 2319.19 2300.00 2496.36 2465.00 2542.53 2508.00 3949.14 3818.00 4158.52 4013.00 4389.38 4228.00 4469.91 4303.00 5017.52 4813.00 0.00 N 1.02 N 1.79 N 2.04 N 2.04 N 2.04 N 2.04 N 3.10 N 6.75 N 6.85 N 9.16 N 9 77 N 28 15 N 30 89 N 33 91 N 34 96 N 42 12 N 0.00 W Begin D'nl Nudge 28.45 W Begin Drop 49.92 W Port Collar 56.80 W Base Permafrost 56.91 W End D'nl Nudge 56.91 W Top W Sak 56.91 W KOP 86.20 W Base W Sak 188.00 W EOC 190.63 W 7 5/8" Casing 255.11 W C80 271.92 W Camp SS 783.88 W C50 860.09 W C40 944.12 W C37 973.43 W Iceberg 1172.74 W T7 RECEIVED ,JUL 2 0 2000 Alaska 0~; & Gas Cons. Commission Anchorage 5393.33 5163 5479.23 5243 5543.65 5303 55~1.97 5348 5731.56 5478 6031.56 5757 00 47 . 03 N 1309 . 53 W T3 . 1 00 49.00 N ~4 W 2N-349 Rvsd 17-Jul-00 00 49.63 N 13~_. 83W T2 00 51.45 N 1432.63 W C35 40 55.38 N 1541.83 W TD - Casing Pt Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing ........................................................................................................... 0.00 0.00 0.00N 0.00E 2319.19 2300.00 6.85N 190.63W 7 5/8" 0.00 0.00 0.00N 0.00E 6031.56 5757.40 55.38N 1541.83W 5 1/2 Casing Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised 2N-349 Rvsd 17-Jul-0 459057.000,5911908.000,0.0000 5303.00 49.00N 1364.24W 20-Dec-1999 RECEIVED JUL 2 0 000 Alaska Oi-; & Gas Cons. Commission Anchorage Phillips Alaska, Inc. Diverter Schematic Nabors 19e Flowline 21¼" 2,000 psi WP DRILLING SPOOL w/16" Outlet 16-3/4" 2M SOW Starting Head 21¼" HYDRIL MSP 2,000 psi WP ANNULAR PREVENTER 16" 200 psi WP HYDRAULIC KNIFE VALVE ~~/ 16" OD DIVERTER LINE 16-3/4" x 21-1/4" x 2M Psi DSA Flange 16" 62 ppf PEB CONDUCTOR PIPE set at 80' (GL) RECEIVED JUL 2 0 200O Alaska 0[( & oas uons. commission Anchorage Phillips Alaska, Inc. Nabors 19e 11" 5,000 PSI BOP COMPONENTS I I 3" 5,000 psi WP OCT n.-j MANUAL GATE V KILL LINE ~r~ L 3" 5,000 psi WP Shaffer GATE VALVE w/hydraulic actuator / J / DSA 13-5/8" 5,000 psi WP x 11" 3,000 psi WP 11" 5,000 psi WP, HYDRIL Type GK ANNULAR PREVENTER w/companion flange to bell nipple DOUBLE 11" 5,000 psi WP, HYDRIL Magnum BOP w/pipe rams on top and blind rams on bottom L_ 1 3" 5,000 psi WP Shaffer GATE VALVE ~ ~,~~raulic actuator 11" 5,000 psi WP  DRILLING SPOOL L-! w/two 3" 5M psi WP outlets I I SINGLE 11" 5,000 psi WP, HYDRIL MPL BOP w/pipe rams I RECEIVED JIJL 20 2000 Anchorage ! Phillips Alaska, Inc. ~.. Post Office Box 100360 Anchorage, Alaska 99510-0360 July 19, 2000 Robert Christenson, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Re: Application for Permit to Drill KRU 2N-349 Surface Location: 158' FNL 1172' FEL Sec 3 T9N R7E, UM or ASP4, NAD 27 coordinates of X=460,421 & Y=5,911,852 Target Location: 110' FNL, 2536' FEL Sec. 3, TgN, R7E, UM Bottom. Hole Location: 103' FNL, 2566' FWL Sec. 3, TgN, R7E, UM Dear Commissioner Christenson, Phillips Alaska, Inc. hereby files this Application for Permit to Drill a development well in the Tarn area, KRU 2N~349, located approximately seven miles southwest of the Kuparuk River Unit's 2M Drillsite. The well is accessed via a new gravel road originating at 2M Pad. Nabors Rig 19e will drill the well. If commercial, the well will also be completed with Nabors 19e. Attached is the information required by 20 AAC 25.005(c). There will be no reserve pit for this well. Waste drilling mud will be disposed of down the annulus of an existing well on Drillsite 2N (subject to AOGCC approval), or hauled to a KRU Class II disposal well. All cuttings generated will be preferentially ground at the on-site ball mill and injected down an approved, existing well annulus on 2N pad or stored temporarily onsite or hauled to the Prudhoe Bay Field for temporary storage and eventual processing for injection down an approved disposal well. The TD of this well will be in the Tarn formation. H2S has not been encountered in this region in any stratum shallower than the Lisburne Formation. Therefpre, Phillips has not included an H2S contingency plan with this Application, and requests an exemption from the H2S requirements. However, all drilling mud, cores and produced fluids exiting the wellbore will be monitored for detectable levels of H2S. The following are Phillips' designated contacts for reporting responsibilities to the Commission: 1) Completion Report Sharon AIIsup-Drake, Drilling Technologist 263-4612 (20 AAC 25.070) 2) Geologic Data and Logs Doug Hastings, Geologist 265-6967 (20 AAC 25.071) If you have questions or require additional information, please contact Tom Brassfield at 265-6377 or me at 265-6434 in our Anchorage office. Sir~cerely, ~ James Trantham Drilling Engineering Supervisor Attachments cc: KRU 2N-349 Well File Phillips Alaska, Inc. is a Subsidiary of Phillips 66 RECEIVED ~ . ,JUL 2_ 0 2000 Ala~ Oi~ & Gas Cons. Commi~ion Anchorage CASH ADVANCE DRA~'T 110 ( 8~-4~10~1 PAY ORDER OF ~: &O ~ &O0 m, Oom: E~ S "'0 & ? D~)LLARS VAUD FOR AI~IOUNT OVER $1000 O0 h ~Ei~m' &O WELL PERMIT CHECKLIST FIELD & POOL /7~?/~//~:~--~ INI'{' CLAS~ '(~ COMPANY~Z,'///~ WELLNAME~/V/-..~ PROGRAM:exp dev ¢"redril ~L/ ~'4:~)/~-..... GEOL AREA ~_~~ ADMINISTRATION II£NGINEERING 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and.number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ................... DATE 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required; does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet'regulation ................ 26. BOPE press rating appropriate; test to ~'~,,.~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. serv wellbore seg ann. disposal para req UNIT# ~ ~[//~NIOFF SHORE O~ GEOLOGY 30. 31. 32. DATE 33. '7. Z.O,~)-O34. N ~N ~ '¥ . Permit'can be issued w/o hydrogen sulfide measures ..... (~)~ Data presented on potential overpressure zones ....... ~, ~,,,Y'~N Seismic analysis of shallow gas zones. ......... >'~,.~ ~ Y N Seabed Condition survey (if off-shore) ....... . ._.,~.../~. Y' -' N Contact name/phone for weekly progress re~ploratory only] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... APPR DATE (B) will not contaminate freshwater; or cause drilling waste... to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. G EOLI;;;~7,,Y: ENGINEERING: UlC/Annular COMMISSION: Comments/Instructions: J§ c:~'nsoffiCe\wordian\diana\checklist (rev. 02/17/00) Well Histocy File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify'finding information, information, of this nature is accumulated at the end of the file under APPENDIXi .. No special'effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Fri Nov 17 13:51:05 2000 Reel Header Service name ............. LISTPE Date ..................... 00/11/17 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 00/11/17 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Kuparuk River Unit (Tarn Pool) MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: RUN 1 AK-MM- 00169 J. MARTIN R. SPRINGER 2N-349 501032034500 Phillips Alaska, Inc. Sperry Sun 17-NOV-00 MWD RUN 2 AK-MM-00169 B. HENNINGSE R. SPRINGER 3 09N 07E 158 1172 153.10 DERRICK FLOOR: 151.77 GROUND LEVEL: 119.30 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 16.000 110.0 6.750 7.625 2330.0 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTRO- MAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AND STABLILIZED LITHO- DENSITY (SLD) . 4. MWD DATA IS CONSIDERED PDC PER THE E-MAIL FROM D. SCHWARTZ OF PHILLIPS ALASKA, INC., ON 11/13/00. 5. MWD RUNS 1-2 REPRESENT WELL 2N-349 WITH API#: 50-103-20345-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 6043'MD, 5776'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVIT (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZES: 6.75" MUD WEIGHT: 9.5 - 9.7 PPG MUD SALINITY: 600 PPM CHLORIDES FORMATION WATER SALINITY: 19149 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/11/17 Maximum Physical Record..65535. File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. .5000 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE NCNT FCNT NPHI DRHO RHOB PEF GR FET RPD RPM RPS RPX ROP $ START DEPTH 2262 0 2262 0 2262 0 2276 0 2276 0 2276 0 2297.5 2305 0 2305 0 2305 0 2305 0 2305 0 2352 0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE STOP DEPTH 5951 5 5951 5 5951 5 5966 5 5966 5 5966 5 5988 5 5995 5 5995 5 5995 5 5995 5 5995 5 6043 0 EQUIVALENT UNSHIFTED DEPTH PBU TOOL CODE MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 2 2262.0 6043.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 1 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 NPHI MWD PU-S 4 1 68 FCNT MWD CNTS 4 1 68 NCNT MWD CNTS 4 1 68 RHOB MWD G/CM 4 1 68 DRHO MWD G/CM 4 1 68 PEF MWD BARN 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Service Unit Min Max DEPT FT 2262 6043 ROP MWD FT/H 0 1090.84 GR MWD API 48~38 240.05 RPX MWD OHMM 0.55 386.35 RPS MWD OHMM 0.54 1413.99 RPM MWD OHMM 0.69 2000 RPD MWD OHMM 0.07 2000 FET MWD HOUR 0.33 54.1 NPHI MWD PU-S 18 64.65 FCNT MWD CNTS 92.2 692.4 NCNT MWD CNTS 12414.6 29702 RHOB MWD G/CM 0.952 3.088 DRHO MWD G/CM -1.277 0.809 PEF MWD BARN 1.89 15.24 Mean 4152.5 168.638 138.579 3.66321 3.8344 12.7761 6.49692 1.25208 35.3185 250.594 18899.2 2.34198 0.0914661 4.04847 Nsam 7563 7383 7383 7382 7382 7382 7382 7382 7380 7380 7380 7316 7316 7382 First Reading 2262 2352 2297.5 2305 2305 2305 2305 2305 2262 2262 2262 2276 2276 2276 Last Reading 6043 6043 5988.5 5995.5 5995.5 5995.5 5995 5 5995 5 5951 5 5951 5 5951 5 5966 5 5966 5 5966 5 First Reading For Entire File .......... 2262 Last Reading For Entire File ........... 6043 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/11/17 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/11/17 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. 2 .5000 BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE NCNT FCNT NPHI DRHO RHOB PEF GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH 2262 0 2262 0 2262 0 2276 0 2276 0 2276 0 2297 5 2305 0 2305 0 2305 0 2305 0 2305 0 2352 0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : STOP DEPTH 5951 5 5951 5 5951 5 5966 5 5966 5 5966 5 5988 5 5995 5 5995 5 5995 5 5995 5 5995 5 6043 0 10-SEP-00 Insite 0 Memory 6043.0 BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL.GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CTN COMP THERMAL NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 18.7 22.6 TOOL NUMBER PB01630GR4 PB01630GR4 PB01630GR4 PB01630GR4 6.750 2330.0 LSND 9.70 45.0 9.9 500 3.6 2.000 1.110 1.900 2.200 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 78.0 146.0 78.0 78.0 GR MWD020 API 4 1 68 RPX MWD020 OHMM 4 1 68 RPS MWD020 OHMM 4 1 68 RPM MWD020 OHMM 4 1 68 RPD MWD020 OHMM 4 1 68 FET MWD020 HOUR 4 1 68 NPHI MWD020 PU-S 4 1 68 FCNT MWD020 CNTS 4 1 68 NCNT MWD020 CNTS 4 1 68 RHOB MWD020 G/CM 4 1 68 DRHO MWD020 G/CM 4 1 68 PEF MWD020 BARN 4 1 68 8 12 16 20 24 28 32 36 40 44 48 52 3 4 5 6 7 8 9 10 11 12 13 14 Name Service Unit Min Max DEPT FT 2262 6043 ROP MWD020 FT/H 0 1090.84 GR MWD020 API 48.38 240.05 RPX MWD020 OHMM 0.55 386.35 RPS MWD020 OHMM 0.54 1413.99 RPM MWD020 OHMM 0.69 2000 RPD MWD020 OHMM 0.07 2000 FET MWD020 HOUR 0.33 54.1 NPHI MWD020 PU-S 18 64.65 FCNT MWD020 CNTS 92.2 692.4 NCNT MWD020 CNTS 12414.6 29702 RHOB MWD020 G/CM 0.952 3.088 DRHO MWD020 G/CM -1.277 0.809 PEF MWD020 BARN 1.89 15.24 Mean 4152.5 168.638 138.579 3.66321 3.8344 12.7761 6.49692 1.25208 35.3185 250.594 18899.2 2.34198 0.0914661 4.04847 Nsam 7563 7383 7383 7382 7382 7382 7382 7382 7380 7380 7380 7316 7316 7382 First Reading 2262 2352 2297.5 2305 2305 2305 2305 2305 2262 2262 2262 2276 2276 2276 Last Reading 6043 6043 5988 5 5995 5 5995 5 5995 5 5995 5 5995 5 5951 5 5951.5 5951.5 5966.5 5966.5 5966.5 First Reading For Entire File .......... 2262 Last Reading For Entire File ........... 6043 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 00/11/17 Maximum PhYsical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 00/11/17 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Reel Trailer Service name ............. LISTPE Date ..................... 00/11/17 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Library. Scientific Scientific Technical Technical Services Services Physical EOF Physical EOF End Of LIS File