Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout200-068 Ima~~ '3roject Well History File Cover( 'ge
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
~)~-~ O- 0-~ Well History File Identifier
Organizing ~o,,~i []
RESCAN
Color items:
[] Grayscale items:
[] Poor Quality Originals:
[]Other:
NOTES:
BY:
DIGITAL DATA
[] Other, No/Type
BEVERLY ROBIN VINCENT SHERY~INDY
Project Proofing
BY: BEVERLY ROBIN VINCENT SHERYL~MARIA~VINDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Scanning Preparation
BY:
BEVERLY ROBIN VINCENT SHERYL~INDY
TOTAL PAGES ,
Production Scanning
Stage 1 PAGE COUNT FROM SCANNED FILE:
Stage 2
BY~
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) ,
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: _,~ YES .... NO
BEVER~NCENT SHERYL MARIA WINDY DAT S
ReScanned fi~diwdu~ p,~,~e JL~pech~/at~ende~j scsnning
RESCANNEDBY: BEVERLY ROBIN VINCENT. SHERYL MARIA WINDY DATE:
Is~
General Notes or Comments about this file:
Quality Checked
12/10/02Rev3NOTScanned.wpd
.STATE OF ALASKA '~ IZE~G ~ V G
ALAS~IL AND GAS CONSERVATION CO SIGN
WELL COAAPLETION OR RECOMPLETION REPORT AND LOG F ~~ ~ ~ 2008
Al~ir~ !10 £ (:ae [`.nr-c (`.nmmi4eirn
1 a. Well Status: ^ Oil ^ Gas ^ Plugged ~ Abandoned ^ Suspended
2oAAC ss.,os 2o~wc 2s.,,o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No, of Completions Zero 1 b. Well CI>t
®Deve opment Exploratory
^ Service. ^ Stra' raphia
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Ab ~ ,~
2/1/2008 ~ 12. Permit to Drill. Number
.200-068 307-384
3. Address:
P.O. Box 196612, Anchora e, Alaska 99549-6612 6. Date Spudded
05/23/2000 13. APINumber
\, 50-029-22671-01-00
4a. Location ofWell (Governmental Section): °~
Surface:
'
' 7. Date T.D. Reached
09/06/2000 14:. WeII Name and Number:
~' PBU 15-45A
4749
FSL, 5180
FEL, SEC. 22, 711 N, R44E, UM
Top of Productive Horizon:
.3295' FSL, 1253' FEL, SEC. 16, 711 N, R14E, UM
8. KB (ft above MSL): 68.06'
Ground (ft MSL):
15. Field /Pool(s):.
Prudhoe Bay f=ield / Prudhoe: Bay
Total Depth:
2164' FSL, 2786' FEL, SEC. 16, 711 N, R14E, UM 9. Plug Back Depth (MD+TVD)
12841 8842 Pool.
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 676014 y-- 5960952 Zone- ASP4 10. Total Depth (MD+TVD)
12906 8840 16. Property Designation:
ADL 028306
TPI: x- 674564 y- 5964746 Zone- ASP4
Total Depth:
x- 673061 y- 5963580 Zone- ASP4 11. SSSV Depth (MD+TVD)
N/A 47. Land-Use Permit:
.
18. Directional Survey ^ Yes ®No
' e i r 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900' {Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD GR / MCNL
22. CASING, LINER AND CEMENTING RECORD
CASING 5'ET13Nt E~EPTH MD SETTING DEPTH TVD HOLE''.- ~.UhtF
Wf`.:PER FT. - GRAD" +,~ TaP •' BgTTOM TflP BO7YOM` SIZE.. CEMENTING F{E~f]E2p-"' . ~Ri}if.~[~;s
" 1. H-4 rf 110' urf 11 26 x r is
9- /8" 40# Surface 3829' S rf ce 3554' 12-1 /4" 305 sx 'G', 1085 sx CS III, 200 sx CS I
7" 2 Surf 2 8' urfa 287 -1/2" 230 s CI ss' '
4-1/2" 1 - 108 5' 11 I 'G'
-7/8" .16# L-80 9584' 12906' 85 5' 840' - /4" 14 I 'G'
23. Open to production or inject ion? Yes ®No z~>' .. _ ,'~us~r~c R cam,
J
"
If Yes, IISt each I
(MD+TVD of Top & Bottom; Pe nterval Open
rforation Size and Number): SIZE DEPTH SET MO PACKER SET
MD
4-1/2", 12.6#, 13Cr80 / L-80 9091' 8936' &9056'.
MD TVD MD TVD
~:" ACM,, ~RACTURE,,GElNENt 9l~ ~ ~ _,
DEPTH INTERVAL MD AMOUNT & KIND OF MATERUU. USED
' ~ MAY Q ~ 2~Q$ 9398' Set Whipstock
26. PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift; etc.):,
N/A
Date Of Test: HOUrs Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:.
FIOW TUbing
Press.. CaSing PreSS: CALCULATED
24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: Oll Gw-vlTr-API (CORK):
27. Cone DATA Conventional Core(s) Acquired? Yes ~ No Sidewal l Core s A wired? Yes No
tf Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithokiigy and presence of oil, .gas. or water
{submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC
COMPLETlO1fi
None a_?~7-~1~~'_
Form 10-407 Rewsed 02/2007 CONTINUED O EvERSE SIDE a
la~~ G
28: GEOLOGIC. MARI~RS (LIST ALL. FORMATIONS KERS ENCOUNTERED): 29. FORMATION TESTS
NAME TVD Well Teste Yes No
• Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Kick Off in Zone 1A 9893' 8789' None
(From 15-45)
Formation at Total Depth (Name):
30. List of Attachments:. Summary of Pre-Rig Work and Daily Drilling Reports, WeII Schematic Diagram
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
0 /~
i
d
~~
y
S
gne
Title Drilling Technologist Date
Terrie Hubb
PBU 15-45A 200-068 307-384 Prepared 8y NameMumber. Ter-ie Mubble, 564-4628
Well Number r N r v I o Drilling Engineer: qty Warren,. 564-5480
IwsrnucnoNS
GENERnL: This form is designed for submitting a complete and correct well completion report and log on alltypes. of lands and leases in Alaska. Submit a
well schematic diagram wlth each 10-407 well completion report and 10-404 well sundry report when the downhole well design is chang~i:
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well produang from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in -other
spaces on this form and in any attachments.
ITEM 13: The APt number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
1TEM 23: If this well is completed for separate production. from more than one interval (multiple completion), s0 state in item 1, and in item 23 show the
produang intervals for only the interval reported in item 28. (Submlt a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
ITeM 26: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas. Injection, Shut-In, or Other (explain).
ITEM 27: Provide a listing of intervals cored and the Corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
ITEM 29 Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
Digital Well File • Page 1 of 1
Well History
Well Date Summary
15=45A 12/17/2007 ***WELL SHUT IN ON ARRIVAL*** (CTD SCREENING)
TAG TOP OF 2 7/8" LINER ~ 9573' SLM W/ 3.5" CENT & SAMPLE BAILER
CALIPER TBG FROM TOP OF LINER TO SURFACE (GOOD DATA)
***WELL LEFT S/I, NOTIFIED DSO***
15-45A 12/22/2007 T/I/O=SSV/780NAC. SI. IA & OA FL (pre-MIT). IA FL ~ 4045' (71 bbls). OA FL near surface.
15-45A 12/29/2007 T/I/O = 2350/800Nac Temp = SI MIT IA to 3000 qsi PASSED 3rd attempt. MIT OA to 2000 qsi PASSED
2nd attempt. (CTD Screen) MIT IA with 63.7 bbls of crude. MIT IA lost 80 psiin the 1st 15 min and 30 psi
in the 2nd 15 min for a total loss of 110 psi in the 30 min test. Bled IAP back to starting pressure. MIT OA
with 2.8 bbls of crude. MIT OA lost 50 psi in the 1st 15 min and 10 psi in the 2nd 15 min for a total loss of
60 psi in the 30 min test. Bled OAP back down to starting. Final WHP's = 2350/800/0
Annulus valves tagged and open to the gauges at the time of departure.
15-45A 1/10/2008 T/IA/OA= SSV/1140/0 Temp=Cold PPPOT-T (PASS) PPPOT-IC (PASS) Pre RWO
PPPOT-T RU 2 HP bleed tools onto THA 100 psi to 0 psi, flush void until clean returns achieved.
Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD
test equipment, re installed Alemite cap. Cycle and torque LDS "ET style" all functioned no problems
PPPOT-IC RU 2 HP bleed tools onto IC test void 1500 psi to 0 psi. Pressured to 3500 psi for 30 minute
test, 3000/ 15 minutes. Checked LDS "ET style" several were out of adjustment, cycle and torqued to 450
ft/Ibs (2nd test) 3500/ 15 minutes, 3450/ 30 minutes. Bleed IC void to 0 psi, RD test equipment re
installed Alemite cap
15.45A 1/19/2008 ***WELL S/I ON ARRIVAL*** (pre ctu)
DRIFT W/ 20' X 3.70" DMY WHIPSTOCK TO 2 7/8" LINER TOP ~ 9553' SLM/9584' MD.
15-45A 2/1/2008 T/I/0=1100/950/0 Temp=S/I Load & Kill (PRE-CTD) Pumped 3 bbls neat meoh down TBG. Start
pumping 140* 1 %KCL down TBG. ****Continued on 02-02-08 WSR****
15-45A 2/1/2008 ***WELL SHUT IN ON ARRIVAL*** INTIAL T/ I/ O = 2400/1120/0.
RIH WITH 4.5" BAKER WHIPSTOCK. TOOLSTRING LENGTH 50.3', MAX OD = 3.70". SET TOP OF
WHIPSTOCK AT 9398'. WHIPSTOCK FACE SET TO LOWSIDE AT 176 DEG RB. BOTTOM OF
WHIPSTOCK AT 9414'. 2 PIP TAGS PLACED INSIDE WHIPSTOCK AT 9407'. POOH.
WELL LEFT SHUT-IN. FINAL T/I/O: 1800/1120/0.
***JOB COMPLETE***
15-45A 2/1/2008 T/I/O = 2400/1120/20 Load & Kill tubing. Pumped a 5 bbl neat methanol spear followed by 90 bbls of 1
KCL into the tubing to kill. Job taken over by LRS unit 46.
15-45A 2/2/2008 ****Continued from 02-01-08 WSR**** Load & Kill (PRE-CTD) Pumped 276 bbls 140* 1 %KCL down
TBG. Pumped 47 bbls 70* DSL down TBG for FP. Pumped 10 bbls meth & 5 bbls crude down FL for FP.
Bleed WHP to 0 psi. FWP=O/0/0 ***Casing valves open to gauges***
15-45A 2/3/2008 T=O; Set 4-1/16" CIW "H" BPV thru tree; 1-2' ext. used, tagged ~ 98"; ***Complete*** (Best/Wortham)
Print Date: 2/27/2008 Page 1 of 1
http://digitalwellfile.bpweb.bp.com/Wllnfo/Reports/ReportViewer.aspx 2/27/2008
•
1.50 RIGU P
2.00 RIGU P
0.50 STWHIP P
3.50 STWHIP P
BP EXPLORATION
Operations Summary Report
Legal Well Name: 15-45
Common Well Name: 15-45A
Event Name: REENTER+COMPLETE Start:. 2/4/2008
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number: N1
Date i From - To I Hours I Task ! Code I NPT I Phase
2/3/2008 07:00 -10:00 3.00 RIGD P PRE
10:00 -10:15 0.25 RIGD P PRE
10:15 - 11:00 0.75 RIGD P PRE
11:00 - 00:00 13.00 RIGD P PRE
2/4/2008 00:00 - 01:00 1.00 RIGD P PRE
01:00 - 06:00 5.00 RIGD P PRE
06:00 - 08:00 2.00 RIGD P PRE
08:00 - 09:00 1.00 MOB P PRE
09:00 - 14:00 5.00 RIGU P PRE
14:00 - 18:30 4.50 MOB P PRE
18:30 - 21:30 3.00 . RIGU P PRE
22:30 - 00:00 I 1.501 RIGU I P ( PRE
12/5/2008 100:00 - 09:30
9.501 RIGU I P I I PRE
09:30 - 12:00 2.50 RIGU P PRE
12:00 -19:00 7.00 BOPSU P PRE
19:00 - 22:00 3.00 BOPSU N SFAL PRE
22:00 - 23:00 1.00 BOPSU P PRE
23:00 - 00:00 1.00 BOPSU P PRE
12/8/2008 100:00 - 01:00
1.001 BOPSURP
PRE
01:00 - 02:30
02:30 - 04:30
04:30 - 05:00
05:00 - 08:30
08:30 - 10:45
10:45 - 11:30
11:30 - 13:30
2.251 STWHIPIP
PRE
PRE
WEXIT
WEXIT
WEXIT
Page 1 of 7
Spud Date: 4/8/1996
End:
Description of Operations
Prep rig for movinng off well.
PJSM for Pulling off well.
Move rig off well and spot for BOP stack teardawn.
Continue with stack teardown. Replace Hydril and double gate.
Continue with BOP stack rebuild
Secure BOP stack in cellar. Lay down wind walls. Scope
down derrick. Lay down derrick.
Prep for move
Move rig from DS 5 to pad 10
Raise derrick and wind walls
Move from Pad 10 to DS 15
Waiting on drill site maintenance crew to install work plattorm
;and ladder on tree. Install tubing straightener on injector, spot
',equipment on pad, meet with DSO for unit work permit. PJSM
for backing over well
Back over well. Set cuttings box. RU tiger tank and hardline
RIG ACCEPT AT 22:30.
NU BOP stack
NU BOP, install drip pan. Ru hydraulic lines to PU new coiled
tubing reel and MU hard line. Spot tiger tank and RU hardline..
Spot satellite camp. Open doors on BOP rams and found hard
cement around rams, chip away same. ND Stack. and clean off
debree from top of swab valve and from stack (2-3 gallons).
NU BOP
Remove injector from stabbing box. M/U guide arch.
Pressure /Function test
During drawdown test discovered opening hoses from hydril
and pipe rams were crossed. Hoses were not properly labeled
when removed from stack for component repairs. Traced lines
and confirmed that all hoses were installed correctly. Attaching.
proper labels to all hoses to stack.
Retest hydril and upper pipe rams. Drawdown test.
PJSM, pull BPV. PT lubricator and pull BPV. 700psi on well.
Attempt to bleed off to TT failed dueapparently to an ice plug
Attempt to thaw ice plug in hard line to tiger tank. Prep to pull
coil from reel to injector.
Pull coil into injector. Dress end of coil.
Slack management. Cut 123' of coil
Install SLB CTC, pull test.
MU Coiltrak UOC, -35F requires circulating through coil every
25 min.
Track down a-line leak in connection at UOC. Tested OK.
Press test UOC and CTC with 4000 psi. OK.
Bleed off WHP from 1000 psi to 250 psi to Tiger tank. WHP
not bleeding to zero.
Bullhead 72 bbls Biozan, 4 bpm at 1500 psi, IAP and OAP = 0
psi.
Bleed WHP to 50 psi, still have slight gas flow at surface.
Not able to bullhead aas awav due to whipstock sacker.
0.75 STWHIP P WEXIT PJSM. M/U nozzle BHA #1 to bottom kill well.
2.00 Sl'WHIP P WEXIT RIH with nozzle BHA. Circ at 0.7 bpm with returns thru choke
to Tiger tank.
RIH to 9370'.
Printed: 2/13/2008 2:42:56 PM
• •
BP EXPLORATION Page 2 of 7
Operations Summary Report
Legal Well Name: 15-45
Common Well Name: 15-45A Spud Dater 4/8/1996
Event Name: REENTER+COMPLETE Start: 2/4/2008 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number: N1
Da#e From - To Hours Task Code NPT Phase Description of Operations
2/6/2008 13:30.-15:00 1.50 STWHIP P WEXIT Circ bottoms up thru choke to tiger tank, 2.5 bpm, 2500 psi.
Circ until returns are steady, gas free and 8.3 ppg.
15:00 - 17:30 2.50 STWHIP P WEXIT POH while Circ at 2.6 bpm, clean returns, full returns.
17:30 - 17:45 0.25 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for M/U window milling BHA.
17:45 - 18:15 0.50 STWHIP P WEXIT M/U 3.80" window milling BHA #2 with 3.80" HCC window mill
and reamer and Xtreme motor, 2 jts PH6 and BHI CoilTrak
tools. BHA OAL = 112.59'.
:1 2. TWHIP P WEXIT RIH with millin BHA
~. 20:15 - 22:00 1.75 STWHIP P WEXIT Dry tag at 9395' CTMD. PUH to 9380', pump on line at 2.57
~s u S ~ BPM ~ 2250 CTP. Tag at 9393.4'. Start time milling from
'
'
9393.0
. Motor work at 9393.4
, set depth to 9398.0'. Gas in
returns, divert to tiger tank. Coiltrak: 300 differential presure,
zero WOB
22:00 - 00:00 2.00 STWHIP P WEXIT 9399.1', 2.55 BPM ~ 2560 GTP. Coiltrak: 460 DP, 1800 WOB
2/7/2008 00:00 - 02:30 2.50 STWHIP P WEXIT Milling 3.80" window at 9400.6' off Baker whipstock in 4-1/2"
liner. TOWS = 9398'. 2.49 BPM ~ 2590 CTP. Coiltrak data:
588 Differential pressure, 3800 WOB
02:30 - 04:05 1.58 STWHIP P WEXIT 9402.6',2.53 BPM ~ 2520 CTP. Coiltrak: 420 DP, 2000 WOB
04:05 - 05:15 1.17 STWHIP P WEXIT 9404.5', appears to be through liner. Continue at 10 FPH with
400 DP, WOB increasing to 4000. 9404.9', 600 DP, 5000
WOB
05:15 - 06:00 0.75 STWHIP P WEXIT 9406.5', start disposing BIO to make room for Flo-pro.
06:00 - 07:00 1.00 STWHIP P WEXIT 9414'. Ream window with up down passes at 1 FPM. Ream
window up and down 3 times.
Dry tag PBTD, OK. Glean window.
07:00 - 08:30 1.50 STWHIP P WEXIT POH with window milling BHA.
08:30 - 08:45 0.25 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for L/O milling BHA and M/U drilling BHA.
08:45 - 09:00 0.25 STWHIP P WEXIT Lay out milling BHA. Window mill and reamer gauged at 3.80"
Go and 3.79" No-Go.
09:00 - 10:15 1.25 DRILL P PROD1 M/U BHI CoilTrak Build BHA #3 with HYC BC Bit, 2.7 deg
Xtreme motor and CoilTrak tools.
BHA OAL = 66.04'.
10:15 - 12:10 1.92 DRILL P PROD1 RIH with BHA #3. Circ. at min rate.
12:10 - 13:00 0.83 DRILL P PRODi Log down with GR for tie-in. Added 6' to CTD.
13:00 - 13:10 0.17 DRILL P PRODi RIH clean thru window. 22.5K down wt.
Tag bottom at 9412'.
13:10 - 15:20 2.17 DRILL P PROD1 Drill build / tum section in Z4 and Z3. 2.6 bpm, 3000-3600 psi,.
2 K wob, 120R, 12 deg inci, 30 fph,
Drilled to 9485'.
15:20 - 17:00 1.67 DRILL P PROD1 Drill build / tum section in Z3 and Z2. 2.6 bpm, 3000-3600 psi,
2 K wob, 70R, 20 deg incl, 40-60 fph,
Drilled to 9550'.
17:00 - 17:15 0.25 DRILL P PROD1 Wiper trip to window. Clean hole.
17:15 - 19:55 2.67 DRILL P PROD1 Drill build / tum section in Z2. 2.6 bpm, 3000-3600 psi, 2 K
wob, 30R, 30 deg inci, 60-80 fph,
Drilled to 9700'.
19:55 - 20:20 0.42 DRILL P PROD1 9700', wiper trip to window. Clean hole
20:20 - 21:55 1.58 DRILL P PROD1 Drill build /turn section in Z2. 2.6 bpm, 3000-3600 psi, 4 K
wob, 60R, 54 deg inci, 80-120 fph,
21:55 - 22:25 0.50 DRILL P PRODi 9850', wiper trip to window.
22:25 - 22:35 0.17 DRILL P PROD1 9420', log down for tie-in. +1.5' correction.
Printed: 2/13/2008 2:42:58 PM
TREE _' CNV
W~LHEAD = FMC
ACTUATOR= BAKER
KB. ELEV = 68.1'
BF. ELEV = _?
KOP = 931'
Max Angle = 93 @ 10635'
Datum MD = N!A
Datum TV D = 8800' SS
DRLG DRAFT
9-5/8" CSG, 40#. L-80, ID = 8.835" 3829'
Minimum ID = 2.37" @ 9002'
3-3/16" LINER TOP PACKER
9002' 1 BAKER Liner top packer seal bore ID = 2.37"
4-1/2" TBG, 12.6#, 13CR80 VAM TOP, 9022'
.0152 bpf. ID = 3.958"
TOP OF 4-112" LNR
4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958"
7" CSG, 26#, L-80, ID = 6.276"
4 1/2" MONOBORE PKR WHIPSTOC
2-7/8" LNR TOP
SAFETY NOTES: 70° @ 9852'
15 -4 5 B *#*4-1 /2" CHROME TBG"**
~ 4-1/2" HES X NIP, ID = 3.813" ~
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3355 3157 32 KBG-2 DMY BK 0 03/05/06
3 5561 5012 35 KBG-2 DMY BK 0 03/05/06
2 7436 6597 26 KBG-2 DMY BK 0 05/14!05
1 8846 7899 19 KBG-2 DMY BK 0 05/14/05
8915' ~ 4-1 /2" HES X NIP, ID = 3.813"
8936' 7" X 4-1 /2" BKR S-3 PKR, ID = 3.875"
8959' 4-1 /2" HES X NIP, ID = 3.813"
9023' TBG STUB (DIMS 05/13/05)
9032' 7" X 4-1 /2" UNIQUE OV ERSHOT
9056' 7" X 4-1/2" BAKER S-3 PKR
9079' 4-1/2" HES X NIP, ID = 3.812"
9091'
9091' 4-1/2" TUBING TAIL WLEG
925$' ~ ELMD TT NOT LOGGED
9398' g2gg' BAKER DEPLOYMENT SUB. ID = 3.00"
9584'
XO 3-3/16" x 2-7/8" -~ 9
PERFORATION SUMMARY
REF LOG: BAKER MWD/GR ON 02/12/08
ANGLE AT TOP PERF: 91 @ 9880'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
2" 6 10810 - 11680 O 02/15/08
2" 6 11930 - 12020 O 02/15/08
4-1/2" TNV WHIPSTOCK ~~
PBTD
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" -~
~~~~\~ PBTD 12034'
3 1/2" x 3 3116" x 2-7/8" LNR 12087'
PBTD ~ 12846' r
2-7/8" LNR, 6.16#, L-80, .0056 bpf, ID = 2.441" 12906'
DATE REV BY COMMENTS DATE REV BY COMMENTS
05104/96 ORIGINAL COMPLETION
09109100 JOM CTD SIDETRACK (15-45A)
05/15105 D16 RWO
08/27/06 TWC/TLH DRLG DRAFT CORRECTIONS
02/16108 NORDICI CTD SIDETRACK (15-45B)
PRUDHOE BAY UNff
WELL: 15-45A
PERMff: 2000680
API No: 50-029-22671-01
SEC 22, T11 N, R14E, 590' FNL & 5177' FEL
BP Exploration (Alaska)
•
t~ ~,~ ~ g~g ~~~ 1 ~. ~ SARAH PAUN, GOVERNOR
LJ
~S~A ~~ ~ vay7 333 W. 7th AVENUE, SUITE 100
CO1~T5ERQATI011T C011II-IISSIOIQ ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Abby Higbie
CT Drilling Engineer
BP Exploration Alaska, Inc. ,,,
PO Box 196612 ~'"~ JAN ~ ~. 200$
Anchorage, Alaska 99519-6612
0
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-45A
Sundry Number: 307-384
Dear Ms. Higbie:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-360? (pager) .
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
DATED this ~ day of January, 2008
Encl.
Sincerely.
~ i-
~/~ STATE OF ALASKA ~~~
I ~ / ALASKA OIL AND GAS CONSERVATION COMMISSION
~~ APPLICATION FOR SUNDRY APPROVAL `~~~ ~ lti~7
20 AAC 25.280 ~,,,,~~,,, -:
1. Type of Request: ®Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time:Extens+on
^ After Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 200-068 ~
3. Address: ^ Service ^ Stratigraphic 6. API Number: .
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22671-01-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU 15-45A '
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s):
ADL 028306 ~ 68.06' - Prudhoe Bay Field / Prudhoe Bay Pool
t2. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
12906 ~ 8840, 12841 8842 None 12830
Ca in Len th Siz MD TVD Burst Colla se
Structural
Condu or 110' 2 110' 110' 149 47
Surfa 3829' 9-5/8" 3829' 3554' 5750 3090
Intermediate 9258' 7" 925 ' 8287' 7240 5410
Pr du i n
Liner 1745' 4-1/2" 9080' - 10825' 8119' - 8776' 8430 7500
Liner 3322' 2-7/8" 9584' - 12906' 8595' - 8840' 13450 13890
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
11815' - 12820' 8820' - 8843' 4-1/2", 12.6# 13Cr80 / L-80 9091'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer; 7" x 4-1/2" Baker'S-3' Packers and SSSV MD (ft): 9056' & 8936'
packer
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: January 15, 2008 ^ Oil ^ Gas ^ Plugged ®Abandoned
17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Abby Higbie, 564-5480
Printed Name Abby Higbie Title CT Drilling Engineer
Prepared By NameJNumber:
Signature Phone 564-5480 Date Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number:
Conditions of approval: Notify Commission so that a representative may witness
^ Plug Integrity OP Test ^ Mechanical Integrity Test ^ Location Clearance
Other: 3 S~~ P~ ~ ~~ ~~ ~ ~ ~,~-.
Subsequent Form Required: ~I~`'1
/,
APPROVED BY
~
fj/
~~
'O
A roved B ISSIONER THE COMMISSION Date v
Form 10-403 Revised 06/2006 `'~~/ Submit In Duplicate
~~ 1GIN L ~
• •
To: Tom Maunder, Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Abby Higbie (564-5480)
CTD Engineer
Date: December 20, 2007
Re: 15-45A Sundry request
CC: Well File
Sondra Stewman/Terrie Hubble
by
Sundry approval is requested for Prudhoe well 15-45A. 15-45A is a September 2000 Horizontal Coil Sidetrack
completed in Z1A. The well was completed in Zone lA with a 2-7/8" liner and 855' of net perforations. It came online
at 3,900 BOPD with a GOR of 2,100 scf/bbl. After completion, the well produced full-time until November 2003 when
it was flagged as having TxIA communication. A calliper survey found the tubing in overall poor condition, with 51
joints having penetrations in excess of 85% of wall thickness. The well was subsequently secured with a tubing tail plug.
A RWO was completed on 15-45A in May 2005 to replace the corroded tubing. It was shut in for 1.5 years waiting for
the RWO. The well came on at 1000BOPD with a GOR of 25,000. After four months the GOR had reached marginal
and was shut in. After a two month shut-in period the well came back on line at only 500 BOPD and over 60,000 GOR
which was well above marginal.
A MCNL was run in 2006, which placed the PGOC 9773' MD. A FCO with dieseUxylene perf was treatment that was
performed on May 25, 2007 made no major improvements in productivity. The July 22, 2007 PDS Memory STP showed
that the bottom set of perfs was contributing 52% of the production while the tops set was responsible for 45%. There is
also a noticeable 1 °F temperature drop at 12650' MD (placed within close proximity to an existing fault) therefore
providing some evidence of gas entry from this interval.
REASON FOR SIDETRACK:
The well currently has an up time of 29% in the last 12 month and is only brought on when there is excess gas capacity.
Its last test on 6/24/07 showed 442 BOD and 87600 GOR. 15-45A is bringing very little benefit to the field in its present
status, hence the need for the sidetrack.
Pre-Rig Work: The pre CTD work is slated to begin on January 15th, 2008.
1. S Caliper inspection to 9500' Done 12/17/07
2. S Run dummy whipstock drift to 9500'
3. E Set Baker 4-1/2" Monobore packer whipstock lowside at 9400'.
4. W Set BPV
5. O Pass MIT-IA, -OA
6. O PPPOT-IC, -T; LDS
7. O PT MV, SV, WV _ t
8. O Blind and bleed lines, remove well house, level pad ~~`~ °~Q`%~~- \
Rig Work:
1. MIRU and test BOPE to 250 psi low and 3500 psi high
2. Mill 3.80" window at an o ope o e. wap ewe
3. Drill Build: 4.125" OH, 900' (30 deg/100 planned)
4. Drill Lateral: 4.125" OH, 1950' horizontal (15 deg/100 planned)
5. Run 3-3/16" x 2-7/8" solid liner leaving TOL at 9310'
6. Pump primary cement job
7. Run MCNL/GR/CCL log
8. Test liner lap to 2000 psi.
9. Perforate, 800' minimum
10. Freeze protect well with diesel down to 2500', Set BPV, RDMO
Post-Rig Work
1. Pull BPV
2. Install well house. Hook up flow line.
LH64D = FMC
,IATOR= BAKER
iEV = 68.1'
iEV = _?
= 931'
Angle = 97 ~ 10909'
m MD = NIA
m TVD = 8800' SS
9-5/8" CSG, 40M, L-80, ID = 8.835"
~ 3829' ~
Minimum ID = 2.37" ~ 9584'
TOP OF 2-7/8" LINER
15-45A ~'F~ab2
2118' H 41/2" HES X NtP, ID = 3.813"
GAS LIFT MANDRELS
S MD TVD DEV TYPE VLV LATCH PORT DATE
3355 3157 32 KBG-2 DMY BK 0 03!05108
3 5581 5012 35 KBG2 DMY BK 0 03/05/08
2 7438 8597 26 KBG-2 DMY BK 0 05!14/05
1 8848 7899 19 KBG-2 DMY BK 0 0.5/14/05
891 b' 41/2" HES X N~, ID = 3.813"
8938' T' X 41/2" BKR S-3 PKR, ~ = 3.875"
8959' 41/2" HES X N~, ID = 3.813"
41/7' TBG, 12.6#, 13CR80 VAM TOP, 9022' 9023' TBG STUB (DMS 05/13!05)
.0152 bpf, ID = 3.958" 8032' T' X 41 /7' UNIQUE OV EI2SH0T
9056' T' X 41/2" BAKER S-3 PKR
9079' 41 /2" HES X Nom, ID = 3.817'
4-
PERFORATION SUAAIAARY
REF LOG: SPERRY MWDIGR ON 09106!00
ANGLE AT TOP PERF: 79 ~ 9880'
Note: Refer to Production DB for historical perf d~a
SIZE SPF INTERVAL OpNSgz DATE
2-3J4" 4 09880- 10080 S 09/09100
2-314" 4 10110 - 10510 S 09~109w00
2-314" 4 10560 - 10770 S 09V09/00
2-3l4" 4 10820 - 108.90 S 09!09/00
2" 4 11815 - 12250 O 09V08/00
2" 4 12360 - 12420 O 09/08/00
2 4 12460 - 12820 O 09!08100
9091' ~~ 41/2" TUBING TAIL WLEG
ELMD TT NOT LOGGED
9584' BAKER DEPLOYMENT SUB, ID = 3.00"
WINDOW MILLED TO 10837.
3.75" HOLE WAS DRILLED TO
TD OF 12908' MD.
FISH: RIG&FASDRN-L II
DEBRIS (O6/25/05)
TOP OF 41/2" LNR H 9080'
12.6#, L-80, .0152 bpf, ID = 3.958" 9091'
7" CSG, 26#, L-80, ID = 8.278" 9258'
41/7' TNU WHIPSTOCK H 10825'
PBTD 10973'
12.6f, L-80, .0152 bpf, ID = 3.958" 11060'
2-7/8" LNR, 8.18N, L-80, .0058 bpf, ~
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/W196 Oti1GINAL CQMPLETK)N 0827106 TWGTLH DRLG DRAFT CORR~TIONS
08/09/00 .K)M CTD SIDETRACK 15-4~5A 11I08>06 RLM?LH PERF SQZ (2000) CORRECTIONS
05NSf8s D78 ti1M0
0521105 RWL/RlC GLV GO
0625105 MDCIP,IC PUSH FASDRILL TO BTM
d3J05lO6 DAV/PJC GLV GO
PRUDFIOE BAY UNfT
WELL: 15-45A
FBi141T: 2000680
AR No: 54029-22671-01
SEC 22, T11 N, R14E, a90' FNL 8 517T FEL
BP 8cploratbn (Atoka)
LHEAD = FMC
CTUATOR = BAKER
KB. REV = 88.1'
BF. ELEV = _?
KOP = 931'
Max Angle = 97 ~ 10909'
Datum MD = N/A
Datum TVD = 8800' SS
8.835"
Minimum ID = 2.37" @ 9300'
TOP OF 3-112" LINER
15-45B
~oposed CTD sidetrack
4-112" TBG, 12.6f, 13CRti0 VAM TOP, 9022'
.0152 bpf, D = 3.958"
~ 4-1 /2" HES X NIP, D= 3.813" ~
7" X 4-1/2" BAKER S-3 PKR
4-1/2" HES X NIP,ID = 3.812"
4-1/2" TBG, 12.61, L-80, .0152 bpf, D= 3.958"
7" CSG, 288, L-80, D = 6.278"
4 112"
PERFORATION SlJAA1AARY
R~ LOG: SPERRY MIMYGR ON 09/06/00
ANGLEAT TOP PERF: 79 (~ 9880'
Note: Refer to Production DB for historical pert data
SQE SPF INT6~VAL OpNSgz DATE
2-3/4" 4 09880 - 10080 S 09/09/00
2-3/4" 4 10110 - 10510 S 09!09/00
2-3/4" 4 10560 - 10770 S 09/09/00
2-3/4" 4 10820 - 10890 S 09/09/00
2" 4 11815 - 12250 O 09/08/00
2" 4 12380 - 12420 O 09/08/00
2" 4 12460 - 12820 O 09/08/00
4-1l2"
,u=
9091' 4-1/2" TUBING TAIL WLEG
ELMD TT NOT LOGG®
9300' BAKER Liner top pacKer seal bore ID = 2 375"
041 A' RA KFR nFPI (1V MFNT SI IR In = ~ nn"
XO 3-3116" x 2-7/8" H 10400'
SAFETY NOTES: 70" ~ 9852'
'••4-1 /2" CHROME TBO"'•
i 4-1 /2" HES X NP, D= 3.813" ~
GAS LIFT MANDRELS
S MD TVD DEl/ TYPE VLV LATCH FORT DATE
4 3355 3157 32 KBG-2 DMY BK 0 03/05/06
3 5561 5012 35 Kt3G-2 DMY BK 0 03/05/06
2 7436 8597 28 KBG-2 DMY BK 0 05/14/05
1 8846 7899 19 KBG-2 DMY BK 0 05/14/05
~~~~;~ TD 12011'
3 1/2" x 3 3/16" x 2-7/8" LNR 12011'
D = 2.441"
PRUDHOE BAY UNfT
VHELL: 15-45A
Pl3iMT: 2000680
API No: 50-029-22671-01
SEC 22, T11 N, R14E, 590' FNL 8 517T F~
l3P t3cploration (Alasks)
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
02/26/2007
SCANNED APR 1 () Z007
NO. 4161
:;po -CXo?J sr
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage. AK 99501
/ Lf 6"'s-4
Field: Prudhoe Bay
Well Job# Log Description Date BL Color CD
15-45A 11485469 MCNL 11/09/06 1 1
01-21 11496877 RST 11/26/06 1 1
.
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503~2838 "'. L.1
ATTN: Beth /) 2 / ,./
Received by: L.:-.
~);. ,2 '¡(Iff'
L.I
.,""
)
11/28/06
Schlunlbøpgøp
NO. 4058
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
~O-ðG~
1'\
\,1
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
WII
J b#
L 0
o
BL
CI
CD
e 0 og escrrptlon ate o or
H-34 11477963 LDURST 11/07/06 1
Y-01B 11485468 MPPROF W/DEFT & GHOST 11/07/06 1
2-08/K-16 11487771 LDL 11/12/06 1
X-03A 11485772 MPPROF WIDEFT & GHOST 11/09/06 1
OS 09-51 11477933 INJECTION PROFILE 11/06/06 1
15-45A 11485469 MPPROF & INJECTION PROF 11/09/06 1
N-07A 11296715 PROD PROFILE WIGHOST 09/10/06 1
OS 09-31C 11483591 INJECTION PROFILE 11/20106 1
G-06A 11422979 SCMT 11/01/06 1
P2-59A 11414775 SCMT 11/05/06 1
NGI-06 11414773 USIT 11/01/06 1
A-43 11414774 USIT 11/03/06 1
01-26A 11001225 RST -SIGMA 05/24/05 1 1
.
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
NO'! ?, 9 Î[)O[)
Alaska Data & Consulting Services
2525 Gambell S_ So"~ È
A."".,., AK ''''''2
ATTN: Beth Q
Received by: I / f\----..
I~
, STATE OF ALASKA) Rl:(~Eb'\/E-
ALASKA .l AND GAS CONSERVATION CO....b1ISSION '''",,,, ~ , l, ..,,,
REPORT OF SUNDRY WELL OPERATIONS JUN 072005
lH,@~~fŒ E~
f' .
t.dJmìnðssiov
1. Operations Performed:
o Abandon
o Alter Casing
o Change Approved Program
o Suspend 0 Operation Shutdown 0 Perforate 0 Other
B Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well
o Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
4. Current Well Class:
B Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number:
200-068
6. API Number:
50-029-22671-01-00
99519-6612
68.06'
9. Well Name and Number:
PBU 15-45A·
8. Property Designation:
ADL 028306
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
11. Present well condition summary
Total depth: measured 12906 feet
true vertical 8840 feet Plugs (measured) None
Effective depth: measured 12841 feet Junk (measured) 12830
true vertical 8842 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 110' 20" 110' 110' 1490 470
Surface 3829' 9-5/8" 3829' 3554' 5750 3090
Intermediate 9258' 7" 9258' 8287' 7240 5410
Production
Liner 1745' 4-1/2" 9080' - 10825' 8119' - 8776' 8430 7500
Liner 3322' 2-7/8" 9584' - 12906' 8595' - 8840' 13450 13890
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
11815' - 12820'
8820' - 8843'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth):
4-1/2", 12.6#
13Cr80 / L -80
9091'
7" X 4-1/2" Baker 'S-3' packer; 7" x 4-1/2" Baker 'S-3'
packer; 4-1/2" HES 'X' Nipple
9056' & 8936';
2118'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
RBDMS BFL ,¡UN 082005
SCANNED .JUN 1 .4. 200!j
Oil-Bbl
Prior to well operation: 934
Subsequent to operation: 1 ,154
14. Attachments: 0 Copies of Logs and Surveys run
B Daily Report of Well Operations
B Well Schematic Diagram
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casinq Pressure
32,169 -0-
29,315 -0-
15. Well Class after proposed work:
o Exploratory B Development 0 Service
16. Well Status after proposed work:
BOil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Paul Chan, 564-5254 N/A
Tubinq Pressure
13.
1,160
946
Printed Name Terrie Hubble
Title Technical Assistant
Signature /fÔftJ\,i.Q ~ fu~
Form 10-404 Revised 04/2004
Phone
564-4628
ORIGINAL
(jo I I Prepared By Name/Number:
Date / D7, 05 Terrie Hubble, 564-4628
Submit Original Only
Well:
Field:
API:
Permit:
)
)
05/11/05
N/A
05/15/05
Doyon 16
04/11/05
RUN 3.70" CENT W/4.5" GS CORE EO PRONG SD 9062' SLM PSI INCREASE FROM 150 TO 200. RUN 4.5"
GR LATCH UP AT 9062' SLM, SHEAR OFF RIH W/X- EO SLEEVE WI PRONG.
15-45A
Prudhoe Bay Unit
50-029-22671-01-00
200-068
Accept:
Spud:
Release:
Rig:
04/12/05
SD WI X-EO SLEEVE WI PRONG AT 9955' SLM, TOOL SHEARED. PULLED XX PLUG AT 9055' SLM. DRIFT
TO 9658' SLM W/2.25 CENT, SAMPLE BAILER.
PRE-RIG WORK
04/15/05
SET HALIBURTON FAS-DRILL PLUG AT 9607' MID-ELEMENT DEPTH, AS PER PROGRAM.
04/16/05
SHOT TUBING PUNCH HOLES FROM 9008' - 9010', TWO STRAND STRING SHOT FROM 9030' - 9042',
CHEMICAL CUT TUBING WITH 3.63" CHC AT 9040'. SEVERING HEAD INDICATES GOOD CUT.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
')
)
Page 1 of 2
BP EXPLORATION
Operations Summary Report
15-45
15-45A
WORKOVER
DOYON
DOYON 16
Date
From - To Hours Task Code NPT Phase
5/11/2005
20:00 - 22:00
22:00 - 22:30
22:30 - 23:00
23:00 - 00:00
00:00 - 01 :00
01 :00 - 04:30
04:30 - 05:00
05:00 - 07:00
07:00 - 09:30
09:30 - 14:00
5/12/2005
14:00 - 14:30
14:30 - 15:00
15:00 - 15:15
15:15 - 16:00
16:00 - 00:00
2.00 MOB P
0.50 MOB P
0.50 MOB P
1.00 WHSUR P
1.00 KILL P
3.50 KILL P
0.50 KILL P
2.00 WHSUR P
2.50 BOPSUR P
4.50 BOPSUF P
PRE
PRE
PRE
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
0.50 BOPSUR P
0.50 PULL P
DECOMP
DECOMP
0.25 PULL P
DECOMP
0.75 PULL P
8.00 PULL P
DECOMP
DECOMP
5/13/2005 00:00 - 01 :30 1.50 CLEAN P DECOMP
01 :30 - 03:00 1.50 CLEAN P DECOMP
03:00 - 11 :00 8.00 CLEAN P DECOMP
11 :00 - 11 :30 0.50 CLEAN P DECOMP
11 :30 - 12:30 1.00 CLEAN P DECOMP
12:30 - 16:30 4.00 CLEAN P DECOMP
16:30 - 17:30 1.00 CLEAN P DECOMP
17:30 - 18:30 1.00 CLEAN P DECOMP
18:30 - 21 :00
21 :00 - 21 :30
2.50 CLEAN P
0.50 CLEAN P
DECOMP
DECOMP
",
Start: 5/14/2005
Rig Release: 5/15/2005
Rig Number:
Spud Date: 4/8/1996
End: 5/15/2005
Description of Operations
Move Rig From 15-22 to 15-45. Rig Accepted @ 2200 hrs
Rig Up and Spot Cuttings Tank.
PJSM and Pre Spud Meeting
R I U DSM Lubricator and Pull BPV. Take on Seawater
R I U Equipment and Hoses to Circulate. Take on Seawater.
Circulate Well to Clean Seawater.
Monitor Well and Check Well is Dead. Set TWC.
N I D Tree
N/U BOPE
R/U Test Lines and Test BOPE, 5 min. 250 psi low and 5 min
3,500 psi high and recorded. Witness of test waived by Jeff
Jones wI AOGCC. All tests passed and witnessed by BP
Supervisor, M. S. Rooney.
P/U Lubricator and pull TWC.
R/U Camco Spooling Unit. Backout Lockdown Gland Nuts. R/U
4-1/2" tubing handling equipmet. P/U Landing Joint, XO and
RIH to engage in top of Tubing Hanger, 8-1/4 turns. BOLDS.
P/U on Landing Joint to 145K and tubing came free wI no drag,
The two Control Lines slipped from their restraints as soon as
they were cut while the Tubing Hanger was above the Rig
Floor.
Circulate Bottoms Up, 168 Bbls, 4-5 BPM @ 220 psi.
POOH and LID 4-1/2" Tbg. Recovered 216 jts 4-1/2" Tbg, 3
Glm's, 1 Cut Jt (28.05'), 22 of 53 Control Line Bands. Able to
spool some Control Line. Balled control line found around
SSSVand 1st joint above SSSV. Fluid Losses -6 bbls I hr.
4-1/2" Tbg Stub @ 9032'.
LID Tbg Handling Equip. Clean Rig Floor. PJSM on M I U
BHA. R I U to Handle BHA and P I U DP.
M I U Clean Out BHA (#1). Rev Junk Basket, PXP Reverse
Sub, Boot Baskets, Bit Sub, Bumper Sub, Oil Jar, XO, 9 4-3/4"
DC's. Total Length = 321.28'
RIH wI Clean Out BHA on 4" DP from Pipe Shed.
P/U 185K, S/O 137K. Dropped Reversing Ball and slowly
washed pipe down (seeing no resistance) from 8,950' to tag top
of 4-1/2" Stub and find it @ 9,023'; set down wI 5K. Repeated
three additional times with same results.
Circulate 20 Bbls Hi-Vis Sweep 6-7 BPM @ 2,000 psi for 300
Bbls. Very little sand or debris over screens.
POOH and SIB 91-stands DP and 3-stands DCs in Derrick.
Breakout BHA #1 and empty Junk Baskets. Recovered - 5 SS
Bands.
M/U Dress Off BHA( #2): Mill Shoe, 3 W IP Extensions, Boot
Basket, Pin x Pin XO Sub, 7" Scraper, 2-Boot Baskets, Bit sub,
Bumper Jars, Oil Jars, and 9-DCs. Length, 330.71'. Total
Wash Over=9.66'
RIH wI 4" DP from Derrick to 8960'
Wash Down and tag top of tubing stub at 9023'. PI U Wt =
185,000 Ibs. S I 0 Wt = 142,000 Ibs. Rot Wt = 160,000 Ibs.
40 RPM's wI Off Btm Torque = 5,000 ft-Ibs. Circ Rate 4 bpm
@ 530 psi. Sat Down on tbg stub 3 times wI 5K WOM. Torque
up to 9,000 ft-Ibs. On fourth attempt able to slide over stub
and work down with 3,000 - 5,000 Ibs WOM. Worked
Printed: 5/16/2005 11 :55:07 AM
)
)
BP EXPLORATION
Operations Summary Report
Page 20f 2
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
15-45
15-45A
WORKOVER
DOYON
DOYON 16
Start: 5/14/2005
Rig Release: 5/15/2005
Rig Number:
Spud Date: 4/8/1996
End: 5/15/2005
5/13/2005 21 :00 - 21 :30 0.50 CLEAN P DECaMP repeatedly until able to swallow tbg stub with overshot with out
rotary or pumps. Dress-Off 9.5' of tbg stub.
21 :30 - 22:30 1.00 CLEAN P DECaMP Pump 20 bbl Safe Clean Pill and 20 bbls Hi-Vis sweep and
chase out of hole while rotating on tubing stub.
22:30 - 23:00 0.50 CLEAN P DECaMP Rig Service - adjust brakes on draw works.
23:00 - 00:00 1.00 CLEAN P DECaMP B I 0 Top Drive and Blow Down. POOH with 4" DP and LID.
5/14/2005 00:00 - 06:00 6.00 CLEAN P DECaMP POOH and LID 4" DP.
06:00 - 07:30 1.50 CLEAN P DECOMP LID Dress Off BHA.
07:30 - 10:30 3.00 RUNCOrvP RUNCMP R/U Torque Turn Equipment. Clear and clean Rig Floor. Check
Completion Jewelry wi Baker Packer Expert. PJSM. Service
Rig.
10:30 - 21 :30 11.00 RUNCOMP RUNCMP RIH wi new 4-1/2", 12.6#, 13CR80, Vam Top Tubing. Torque
all Vam Top connections to 4,440 Lb-Ft and use Jet Lube
Seal-Guard pipe dope.
21 :30 - 22:30 1.00 RUNCOrvP RUNCMP P I U WT = 145,000 Ibs. S I 0 WT = 115,000 Ibs. Tag Tbg
Stub @ 9023'. Set Down wI 12,000 Ibs, Overshot not going
over Tbg Stub, P I U and Rotate 1 full turn. Go back down and
tag again. Set Down wi 10,000 Ibs to get over Tbg Stub. RIH
4 ft, shear pins in Overshot with 10,000 Ibs. RI H another 4 ft
and stack out with 15,000 Ibs.
22:30 - 23:30 1.00 RUNCOMP RUNCMP LID Jts #211,210, and 209. PI U 3 Pup Joints, ( 9.84', 9.81'
and
7.76'). RIH with Pups and Jt #209. M I U FMC Tbg Hanger
and Landing Joint. R I U to Reverse Circulate.
23:30 - 00:00 0.50 RUNCOMP RUNCMP Reverse Circulate in 120 deg Seawater and Corrosion Inhibitor
@ 3 bpm, 250 psi.
5/15/2005 00:00 - 01 :00 1.00 RUNCOrvP RUNCMP Continue, Reverse Circulate Seawater and Corrosion Inhibitor
@ 3 bpm, 250 psi.
01 :00 - 02:00 1.00 RUNCOrvP RUNCMP Land Tbg Hanger and RILDS. Drop Ball and Rod. 1-7/8" Ball
and Rod Assy. (OD=2.125") wi 1-3/8" Fishing Neck. R I U to
Pressure Test Tbg & Annulus.
02:00 - 03:30 1.50 RUNCOfvP RUNCMP Pressure Up on Tbg to set Packer and PT to 3,500 for 30 mins.
Bleed Tbg to 1500 psi, PT Annulus to 3500 psi for 30 mins.
Bleed Off Tubing Pressure and Shear DCK Valve.
03:30 - 04:30 1.00 RUNCOrvP RUNCMP RID Circulating Equipment and Pull Landing Joint. Set TWC
and PT wI 1000 psi from below.
04:30 - 06:00 1.50 BOPSUR P RUNCMP N I D BOPE.
06:00 - 10:00 4.00 WHSUR P RUNCMP N/U Tree and Adapter Flange. Test to 5,000 psi.
10:00 - 12:00 2.00 WHSUR P RUNCMP Reverse Circulate 80 Bbls Diesel Freeze Protect and allow to
U-Tube.
12:00 - 13:00 1.00 WHSUR P RUNCMP Install BPV and test to 1000 psi. Secure well, install Gages on
Tree.
13:00 - 15:00 2.00 WHSUR P POST Secure well and Rig Down to prepare to Move Off Location.
Release rig @ 1500 hours.
Printed: 5/16/2005 11 :55:07 AM
)
')
Well:
Field:
API:
Permit:
15-45A
Prudhoe Bay Unit
50-029-22671-01-00
200-068
Accept:
Spud:
Release:
Rig:
05/11 105
NIA
05/15/05
Doyon 16
POST RIG WORK
OS/21/05
PULLED BALL AND ROD AT 8937' SLM. PULLED DCK FROM STA #1 AT 3355' MD. PULLED DGLV FROM
STA #2 AT 5561' MD, SET DOME GLV ON BK LATCH IN STA #1 AT 3355' MD. SET S/O GLV ON BK LATCH IN
STA #2 AT 5561' MD. PULLED RHC BODY AT 8959' MD. DRIFT WITH 2.30 CENT & 2.25 LIB TO 9547' SLM.
OS/22/05
RUN 2.25 PUMP BAILER TO 9547' SLM SAMPLE GIVEN TO REP.
OS/23/05
RIH WITH 2.3" 6 BLADE CONCAVE MILL BIT. DRY TAG AT 9574' CTMD. ESTABLISH FREE SPIN OF 1623
PSI AT 1.5 BPM. MILLING ON FAS DRILL, MULTIPLE MOTOR STALLS FROM 9574' - 9595' CTMD. MOTOR
STALLS ARE INCONSISTENT, STALLS ARE NOT PROGRESSIVELY DEEPER. POOH AND INSPECT TOOLS.
MILL DAMAGED BADLY. ALL 6 BLADES SHOW EXTENSIVE WEAR (>99%), CARBIDE BUTTONS GONE.
METAL SHAVING FOUND IN TOP OF CTC. 3/4" X 1/2" INDENTION IN CENTER OF BOTTOM OF MILL BIT.
BODY OF MILL BIT SHOW EXTENSIVE WEAR. METAL PIECES INBEDDED IN WATER COURSES OF BODY
(PIECES OF SS BANDING). CIRCULAR WEAR ON BIT BOX. INSPECT PIPE, FOUND SIGNIFICANT PIPE
DAMAGE ABOVE THE CONNECTOR. CUT OFF CONNECTOR AND 23' OF PIPE. RIH WITH PDS MEMORY
GRICCL TO ESTABLISH ACCURATE DEPTH CONTROL.
OS/24/05
RIH WI MEMORY GR/CCL. SAT DOWN AT 9579' CTMD. PUH LOGGING AT 35 FPM. FLAG PIPE (RED) AT
9460' CTMD. CONTINUE LOGGING UP HOLE TO 8800' CTMD. POOH. LOG DATA INDICATES THAT MILL
WAS 18' INTO 2 7/8" LINER OR APPROX. 5' ABOVE ORIGINAL SETTING DEPTH OF THE FASDRILL. RIH
WITH WFD VENTURI JUNK BASKET. SAT DOWN AT 9597' CORRECTED. WORK VENTURI JUNK BASKET.
POOH. VENTURI BARREL CONTAINED APPROX. 3 CUPS OF STEEL, STAINLESS STEEL, BRASS AND
RUBBER SHAVINGS. A LARGE PIECE OF STEEL WAS BRIDGED IN THE BOTTOM OF MULE SHOE WHICH
PREVENTED ADDITIONAL SHAVINGS FROM COLLECTING IN TOOL. RIH WITH 2ND WFD VENTURI JUNK
BASKET. SAT DOWN AT 9575' CORRECTED, (LINER TOP AT 9577' CORRECTED). MADE MULTIPLE
ATTEMPTS TO PASS THROUGH LINER TOP. COULD NOT GET BELOW 9575' CORRECTED. PARKED COIL
AND WORKED VENTURI JUNK BASKET. POOH. NO DEBRIS IN VENTURI BARREL. TIP OF MULE SHOE
HAS DIMPLES FROM HITTING ON LINER TOP OR DEBRIS. CUT 468 FT OF COIL. RIH WITH WFD VENTURI
JUNK BASKET WITH BURNOVER SHOE. SAT DOWN AT LINER TOP AT 9572' CTMD. ROTATE IN.
STARTED BURNING AT 9592' CTMD. WORK DOWN TO 9595' CTMD THEN SAW EASY GOING. CONTINUE
TO 9642' CTMD WITH VENTURI/BURN SHOE. POOH.
TREE =
W8..LHEAÒ =
ACTUATOR =
KB. REV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD =
CrN
FMC
BAKER
68.1'
?
200'
97 @ 10909'
N/A
8800' SS
')
1 9-5/8" CSG, 40#, L-80, ID = 8.835" I., 3829' i----.4I
Minimum ID = 2.37" @ 9584'
TOP OF 2-7/8" LINER
14-1/2", 12.6#, 13-CR-80-, .0152 bpf, ID = 3.958" l-i 111
1 TOP OF 4-1/2" LNR I., 9080'
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" l-i 9091'
7" CSG, 26#, L-80, ID = 6.276" ,I-i 9258'
1 2-7/8" LNR TOP l-i 9584'
PERFORA TION SUMMARY
REF LOG: SPERRY MWD/GR ON 09/06/00
ANGLE AT TOP PERF: 79 @ 9880'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-3/4" 4 09880 - 10080 C 05/02/96
2-3/4" 4 10110 - 10510 C 05/02/96
2-3/4" 4 10560 - 10770 C 05/02/96
2-3/4" 4 10820 - 10890 C 05/02/96
2" 4 11815 - 12250 0 09/08/00
2" 4 12360 - 12420 0 09/08/00
2" 4 12460 - 12820 0 09/08/00
I PBTD l-i 10973'
14-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" l-i 11060'
15-45A
SAFE:. ':tOTES: 4·1/2" CHROME TBG
From DRLG Draft
I I
2118' l-i 4-1/2" HES X NIP, ID = 3.813"
l
GAS LIFT MANDR8..S
.. ST MD lVD DEV lYPE VLV LATCH PORT DATE
4 3355 3157 32 KBG DOME BK 16 05/21/05
3 5561 5012 35 KBG SO BK 20 05/21/05
2 7436 6596 26 KBG DMY BK 0
1 8846 7899 19 KBG DMY BK 0
. . 1 8915' l-i 4-1/2" HES X NIP, ID = 3.813" 1
:8: z---I 8936' l-i 7" x 4-1/2" BAKER S-3 PKR 1
! ~ 1 8959' l-i 4-1/2" HES X NIP, ID = 3.813" I
1 9022' 1-1 UNIQUE MACHINE OVERSHOT
:8: :8'-i 9056' I., 7" X 4-1/2" BAKER S-3 PKR 1
~r 'J 1 9079' I., 4-1/2" HES X NIP, ID = 3.812" 1
.
~ 9091' I., 4-1/2" TUBING TAIL WLEG 1
~ .. l-i ELMD TT NOT LOGGED 1
1 I I 9584' l-i BAKER DEA..OYMENT SUB, ID = 3.00"
WINDOW MILLED TO 10832'.
3.75" HOLE WAS DRILLED TO
TD OF 12906' MD.
110825' Mcl-l TIVV 4-1/2" WHIPSTOCK 1
~ 1 PBTD I., 12846' 1
1 2-7/8" LNR, 6.16#, L-80, .0056 bpf, ID = 2.441" l-i 12906' 1
DATE REV BY COMMENTS
05/04196 ORIGINAL COM PLETION
09/09/00 JOM SIDETRACK COM PLETION
02107/02 RNfTP CORRECTIONS
06/13/03 CMOITLP KB 8..EV A TION & MAX ANGLE
09/12/03 CMOITLP DATUM MD & PERF ANGLE
02120105 TWc/PJC CORRECTION TIP (11/27/03)
DATE REV BY COMMeiTS I
05102105 JLA/PJC CORRECTIONS (1REEIW8..HEAD)
05/03/05 NBF/PJC FASDRlLL A..UG @ 960r
05/03/05 NBF/PJC CHEM CUT @ 9040'
05/21/05 RWUPJC GLV C/O
05/25/05 MDCIPJC FUSH FISH TO 12830'
PRUDHOE BAY UNIT
W8..L: 15-45A
PERMIT: "2000680
API No: 50-029-22671-01
SEC 22, T11 N, R14E, 590' FNL & 5177' F8..
BP Exploration (Alas ka)
15-45A (PTD #2000680) Classified as Problem Well
)
Subject: 15-45A (PTD #2000680) Classified as Problem Well
From: "Anders, Joe L" <anders22@BP.com>
Date: Sun, 01 May 2005 21 :45:09 -0800
To; CahalaTW@BP.com, "Rossberg, R Steven" <RossbeRS@BP.com>, "NSU, ADW Well . .
Op.erations Supervisor" <NSUADWWellOperationsSupervisor@BP..com>,"GPB, Wells Opt Eng~' .
<GPBWellsOptEng@BP.com>, ItAOGCC Jim Regg (E-mail)..<jim~tegg@admin.state.ak.uS>; . .
"AOGCC . Winton Aubert (E~mai1)" '<winton.;...(lubert@admin.state.ak.us>;' ','NSU, ADW :WL&~~. . .
Co:mpletion:Supervisòr"<:NSÜADWWL&CompletionStiþervisor@BP.C()m>~ tlGPB,:'EO'C: "': . "
Sp~cialists" <GPBEOCSpecialists@BP.com>,'''OPB, GC3 Area Mgr" '<GPBGC3TL@BP.com>", ~
"GPB, GC~ Wellpad Lead" <GPBGC3W ellpadLead@BP.c0nI>'· "Chan~: Paul. (PRAY'·' ~. ..',.
<cbanpl@BP.~om>, "Reem, David cn<Re~mDC@BP.com>·.. '.' , ,-, ' " '
cc:' "NSU, ADW Well Integrity 'Engineer". <NSUADWW ellIntegrityEngineer@BP.cöm>" "Mielke~ -
R8bertL." <robert.IDielke@BP.com> . '," I',
)
All,
Well 15-45A (PTD #2000680) has sustained casing pressure on the IA and has been classified as a
Problem well. The TIO pressures on 04/29/05 were 2450/2450/30. This well is scheduled for a Rig
workover, ETA 5/10/05.
The plan forward for this well is as follows:
1. FB: L&K, pre-RWO
Attached is a wellbore schematic. Please call if you have any questions.
«15-45A.pdf»
Joe Anders, P.E.
Well Integrity Coordinator, BP Exploration, (Alaska) Inc.
Work: 1-907-659-5102
Mobile: 943-1154
Pager: 659-5100, x1154
Email: NSUADWWelllntegrityEngineer@bp.com
SCANNED JUL Ü? 2.0Œj
Content-Description: 15-45A.pdf
Content-Type: application/octet-stream
Content-Encoding: base64
1 of 1
5/1 0/2005 8:54 AM
TREE =
WELLHEA D =
ACTUATOR =
KB. ELEV ==
BF'."EU:V =
KOP=
Max Angle :::
Datum MD ==
bstÙm TV Ö;"
FMC
CrN
BAKER
68.r'
'?'
931'
97 @ 109Ö9'
N/A
... ....... ...............,......,..........
8800' SS
)
9-5f8" CSG, 40#, L-80, ID = 8.835"1---1 3829' ~
Minimum ID = 2.37" @ 9584'
TOP OF 2-7/811 LINER
I TOP OF 4-1/2" LNR 1-1
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID:: 3.958" 1-1
7" CSG, 26#, L-BO, ID = 6.276" 1-1
I 2-7/8" LNR TOP)-I
9080'
9091'
9258' r--.4I
9584' I
PERFORA TION SUMMARY
REF LOG: SPERRY MWD/GR ON 09/06/00
ANGLE AT TOP PERF: 79 @ 9880'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2-3/4" 4 09880 - 10080 C 05/02/96
2-3/4" 4 10110 - 10510 C 05/02/96
2-3/4" 4 10560 - 10770 C 05/02/96
2-3/4" 4 10820 - 10890 C 05/02/96
2" 4 11815 - 12250 0 09/08/00
2" 4 12360 - 12420 0 09/08/00
2" 4 12460 - 12820 0 09/08/00
I PBTD 1-1 10973'
14-1/2" LNR, 12.6#, L-80, .0152 bpf, 10= 3.958" 1-1 11060'
DATE
05/04/96
09/09/00
02/07f02
06/13/03
09/12/03
02/20/05
REV BY COMMENTS
ORIGINAL COM PLETION
JOM SIDETRACK COMPLETION
RNtTP CORRECTIONS
CMOITLP KB ELEVATION & MAX ANGLE
CMOITLP DATUM MD & ÆRF ANGLE
lVVClPJC CORRECTION TIP (11/27/03)
DATE
15-45A
-
SA~ ~. ì NOTES: 70° @ 9852' AND 90° @ 9980'
2184' 1-1 4-1/2" HES HXO SVLN SSSV NIP, 10 = 3.813" 1
~
l----l ST MD TVD DEV
1 . 4001 3699
2 7098 6300
3 8987 8031
GAS LIFT MANDRELS
TYPE VLV LATCH PORT DATE
KBG2LSMOD DOME INT
KBG2LSMOD SO INT
KBG2LSMOD DMY INT
~ 9056' 1-1 7" X 4-1/2" BAKERS-3 PKR 1
19065' sLMI-I 41-2" XX PLUG (11/27/03))
I 9079' 1-1 4-1/2" HES X NIP, 10::: 3.812" I
g
~M~
..
. I
~
9091' 1-1 4-1/2" TUBING TAIL WLEG 1
1-1 ELMD TI NOT LOGGED 1
9584' 1-1 BAKER DEPLOYMENT SUB, ID::: 3.00"
WINDOW MILLED TO 10832'.
3.75" HOLE WAS DRILLED TO
TO OF 12906' MD.
110825' Mol-l TIW 4-1/2" WHIPSTOCK I
I PBTO 1-1 12846' 1
I 2-7/8"LNR,6.16#,L-80,.0056bpf,10==2.441" 1-1 12906' I
REV BY
COMMENTS
PRUDHOE BAY UNIT
WELL: 15-45A
PERMIT: 2000680
Apt No: 50-029-22671-01
SEC22, T11N, R14E, 590' FNL & 5177' FEL
BP Exploration (Alaska)
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F: \LaserFiche\CvrPgs _ Inserts\Microfilm _Marker .doc
KB. ~ = e~'
BF. ~= ?
KOP = 931'
~x An gle = g4 ~ ~ 0722' I
D~tum ~D = 8~0' SS
GAS MFT ~NDEELS
I Minim um ID = 2"37" ~ 9584' ITOP OF 2-7," LINER L ST MD ~D D~ ~PE VLV ~TOH PORT DA~2~ 7Q~B~O~ 6~03699 KBG2~DKBG2~D INTINT
3 ~87 803~ KB~2~D INT
I I ~'
g*~9' I~ 4 1~" HES X NIP. D = 3.B12"
I lfl o a.i ii '
I 9~4'mdBAI~RDE~OY~NTSUB. D=3.~"
P~FORATIDN SU~RY II
R~ LOG: S~RRY ~DIGR ON ~D WINDOW MI~ED TO
ANG~ AT TOP ~RF: ~ ~ 11alD mm3.75" HO~ WAS DRIL~D TO
Note: Refer t~ Production DBf~[ hkterEalpe~ d~a TD OF t~06'
S~ E S PF INT~VAL 0 ptdSqz DA ~
~-314' 4 ~0- t~aD C ~ 0~/0~g6 II
m 2-3/4' 4 10110- 10510 C
2- 3/4' 4 10~0- 10770 0 05~6
=-~,~' 4 lO.2o-l~ c o~o ~% llOSZS'MOld ~ID"WHIPSTOCK
2" 4 1~B15- 1~ O
2" 4 12~0- 12420 O Og~8/OO
2" 4 '12~0- 1~20 0 0~00
d I
I H
J 41~'LNR, 12.~,L-SD, O.O1~bpf, ID=3.~8" J~ 11060' m
m
DATE R~ BY CO~mTS DAm R~/ BY COMb~NTS mUDHOE BAY UNIT
05~4~ ORIGINAL CO~TIDN WEL~ 15-~A
Og~ JOM SID~CK COM~E~ON PERMIT: 2OOZED
OgD7~ SIS-~I GO~T~ TO CA.AS AR No: ~-0~.~071.01
g3~5~1 SI~ MD FINAL SEC 22, TllN, RI~, ~0' FNL & 51~' FEL
,
g2~7~2 R~TP CORR~TIONS
BP ~plor~i~n [AI~ ka)
PERFORATION SU IUIvlARY
RI~' LOG: SFERRY MWD/GP, ON 139/06/00
ANGLE AT TOP PERF: S2 @ 11810
Note: Refer to Production DB f~[ historical perf data
817 E S PF INTERVAL 0 pr~/Sqz DA TE
2- 3/4' 4 gl~lO - t I~laD C 05/0~g6
2-3/4' 4 10110- 10510 C 05/0~J36
2- 3/4' 4 105e0 - 10770 0 05/02/g6
2-:3/4' 4 10820- 1DSOO C 05/02/96
2" 4 11B15 - 1.%o50 O Og/OB/OO
2" 4 12360- 12420 O 0~/08/00
2" 4 12460- 12820 0 Og/013/O0
DATE REV BY COIVI~ENTS; DA'rE ~EV BY COMIVENT$
05/04/1~1 ORIGINAL GOIVPLETIDN
O9/[}g/JX] JOM SID~CK COM~E~ON
g9~7~ SIS-~I GO~T~ TO CA.AS
g3~5~1 SI~MD FINAL
02~7~2 R~TP CORR~TIONS
8CANNED 3 0 2003
STATE OF ALASKA -
ALASKA OIL AND GAS CONSERVATION COMMISSION
.APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well:
Alter casing: Repair well: Plugging: Time extension: Stimulate:
Change approved program: Pull tubing: X Variance: Perforate: X Other: Install ESP
2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB)
Union Oil Company of California (UNOCAL) Development: X RT above MSL 106 feet
3. Address Exploratory: 7. Unit or Property name
P. O. Box 196247 Stratigraphic:
Anchorage, AK 99519-6247 Service: Trading Bay Unit
4. Location of well at surface 8. Well number
Dolly Varden D-1
Leg A-2, Conductor 1, Dolly Varden Platform 9. Permit number
755' FSL, 1126' FWL, Sec. 6-8N-13W, SM 67-80
10. APl number
50- 733-2'be~
11. Field/Pool
12. Present well condition summary ,,,~,-~,-~ ~,~,r,~,,,,,~,, ,-,.,,.,~...
Total depth: .measured 12,071' feet v/
/
true vertical 9,772' feet
Effective depth: measured 11,998' feet Tagged Fill (measured) 11,963'
true vertical 9,727' feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 716' 20" 1600 sx 716' 716'
Surface 2527' 13-3/8" 2100 sx 2527' 2430'
Intermediate 9690' 9-5/8" 2066 sx 9,690' 7929'
Production
Liner 2494' 7" 820 sx 12,063' 10,077'
Perforation depth: measured 11255'- 11295" 11320'- 11410'(squeezed); 11435'- 11495" 11515'- 11670" 11695'- 11850';
11,865' - 11,930'
true vertical 9163' - 9194' · 9213' - 9282' (squeezed); 9301' - 9347' · 9362' - 9481' · 9500'- 9616' ' 9627' - 9675'
Tubing (size, grade, and measured depth) 4-1/2" 12.6# & 3-1/2" 9.2 pp.f L-80, AB mod btc, 11,178'
Packers and SSSV (type and measured depth) Baker - Brown 3 H 7" Perm Pkr @ 11,103' & Otis 4-1/2" Otis series 10 ball type SSSV @ 325'
13. Attachments Description summary of proposal: X Detailed operations program: BOP sketch: X
14. Estimated date for commencing operation 15. Status of well classification as:
2/14/2003
16. If proposal well verbally approved: Oil: X Gas: Suspended:
Name of approv~ Date approved
Service:
ESP
Conversion
17. I here.~~~ ~e fo~ ,g i_~s true and correct to the best of my knowledge.
Sign~,-.,..-,.-1 ~l_arry Buster Title: Drilling Engineer Date: ~ ~'~ ~ (~'-'~
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness .'~ I~ (~ ~ ~-_~'~, '~-"~(~ ~' ...~%,.~
Plug integrity BOP Test~ Location clearance. ___ '
Mechanical Integrity Test~ ~ Subs~l.uent form required 10- ~"~:~---~ ~ ,... "~' '~ ..........
A~ch0rage
Approved by order of the Commissioner ORIGINAL S'~NED ~ Commissioner Date,...
Bill
SUBMIT IN TRIPLICATE
DOLLY VARDEN D-1 ESP CONVERSION
WORKOVER PROCEDURE
Skid Rig
Skid rig from D-17RD Well.
(Bleed off tbg & csg pressure & kill well prior to skid)
Pull Completion
1 Install BPV, N/D Tree and flow line.
2 N/U BOPE, replace BPV w/2-way ck valve - test blind ram to 3,000/250 psi
3 Retrieve 2-way check valve - rn/u ldg jt. Test BOPE to 3,000/250 psi
4 B/O hold down screw on tbg hanger. Pull seal assy out of production packer
5 POOH and L/D 4-1/2" x 3-1/2" completion string
6 M/U Spear and RIH. Engage PBR/Anchor Assy. and release same.
7 POOH with PBR and Anchor Assembly.
8 M/U Packer Retrieving Mill Assy. RIH, bum over Packer and recover same.
9 M/U 6" clean-out assy. RIH and clean out 7" liner thru the Hemlock Perfs.
10 M/U 9-5/8" Retrivable Packer. RIH to below the floor and set the same.
11 Test on top of the packer to 1,000 psi.
12 N/D BOPE and change out tubing hanger spool.
13 N/U BOPE and test same to 3,000/250 psi. Recover Retrievable packer.
Perforate
14 M/U TCP Gun Assy. RIH, correlate with E-Line, set packer in 9-5/8" csg.
15 Test 9-5/8" casing to 1500 psi.
16 Fire TCP guns. Circulate well and POOH.
Run Completion
17 M/U ESP Motor Assembly and RIH with 4-1/2" tubing.
18 MU hanger, make splice and Land hanger.
19 Install BPV.
20 Nipple down BOPE
21 Install & test tree to 3000 psi
Dolly Varden D-1
Workover to Add G-Zone Perfs & Convert to ESP
Unocal Alaska requests Sundry Approval to add G-zone perforations to the
existing Hemlock perforations during the upcoming ESP conversion
workover of Dolly Varden Well D-I. Specifically, Unocal Alaska requests
permission to run a 4 1/2" ESP completion without a;
1. subsurface safety valve (20 ACC 25.265)
2. production packer (20 ACC 25.200).
Justification:
1. The current gas lifted Hemlock completion passed a No-Flow test on
December 22, 1998.
2. The G-Zone is known to be partially depleted and is expected to be a
thief zone with a SIBHP of 2,518 psi at -8850'SS.
3. The well is expected to produce +9000 BFPD with a high watercut (+/-
90 to 95%) after the ESP is installed. Therefore, reservoir pressure
in the vicinity of the subject wellbore is predicted to decline, thus the
potential for unassisted flow is predicted to decrease.
DOLLY VARDEN D-1 ESP CONVERSION WORKOVER
BEFORE
AFTER
20" Csg 94 # H 40 @ 716'
13-3/8" Csg 61 # K 55 @ 3,043'
TOL 7" Liner @ 9,569'
9-5/8" Csg 40, 43.5, 47 # N 80 & P 110 @ 9,690'
Proposed New Perforations:
10,730'- 10,755'
10,810'- 10,825'
10,850'- 10,890'
7" Baker Seal Iocator @ 11,087'
Baker 7" 3H Pkr @ 11,103'
B-1
B-2
B-3
B-4
B-5
B-6
Existinq perforations:
11,250'- 11,300'
11,435'- 11,495'
11,515'- 11,670'
11,695'- 11,850'
11,865'- 11,930'
7" Csg 29 # N 80 @ 12,063'
~0° Cso
94# H-40
13-3/8'
&l# K-SS
· 3,043'
TnL 7'
· 9569'
9-5/8' Cs~
43.5, 47#
N-80 & P-110
E 9690'
MARATHDN DIL CDMPANY
TRAZ)ING :BAY UNIT
WELL D-!
~eosure,ents Are RK]) to
40.5' Cameron 4.5' '])C])' Tb9 Hnor.
325' O~ls 4.5' ~erles 10
C:omOt~lon -C~rln_o~
0'-95.13' 4.5' 1;~.6#, L-80, A]) Mod
~13'-~16' 4.0' x 3.~' XD..
9~16'-1~178' 3.5' 9.3fl, EUE ~ L-BO ~
Gas LIF~ ~andrets ]-7 ore 4.5' FtopetroL
;~*~ coupLings. HGndreLs 8--~D Gte Canto ~G-~[
H~ ;~ 8rd coup(l~s. VGLves Gte C~CD
w/ RK LG~che5. ~GL~e ~0 ~ oriole
;~477' #1 I6/64'
4588' #~ 16/64' Port
6075' #3 ~0/64' P~
7080' &4 24/64' Port
7777' ~ ~4/6~'
84~' i6 ~4/64'
9011' ~7 20/~4' P~
9610' ~8 ~0/64'
3~74~' ilo 24/G4' ~lFIce
])-1
1L087'
11,088'
1L103"
11,113'
11,17B'
~B-2
B-4
])-5
3-6
B-6
TD @ 18~063'
])at(er ~eot Assenbly LocG~o~ L seat
C12.78').
BAker PBR w/'CH' Anchor LG'tch.
7', ~?t BAker--Brown 3M Per~ Pkr C4.00'
w/n#lou~ ex~ensi~.
4.5' x 3.5' XO CLTC Box x ;~ 8rd).
Otis 'XN'
Baker $~or~ ~ub w~L re-enVy Guide.
1]~O'-]J,~' 8 SPF 120' P~s~D 01/89
1L3~0'-1 ~4 LO' 4 S que e zed
1~51~'-1~670' 8 120' ~hG~i~ 01/89
2~865'-11,9~' 8 -
Rev~slon ~a~e. 3/20/89
ReYLsed By~ MRO/nef
Reoso~ GL.V Changes
Previous Revls~n, 2/7/89
Dolly Static BHPs from Platform Shut Down Beginning 9/22/01
G-Zone Pressures
Hal Martin
Wells G-Zone Benches Shut In Period Datum Pressure
D-3RD2 G-2, 3, 4 13 Days 2518 psia
D-4RD G-2, 3, 4, 5, 6 16 Days 3017 psia
D-5RD No Pressure Taken Yet
D-26 G-2, 3, 4 11 Days 2520 psia
D-31RD G-2, 3, 4 12 Days 2595 psia
D-32 G-2, 3, 4 12 Days 3225 psia
D-46 G-2, 3, 4 15 Days 2984 psia
Notes: Datum at-8850' SS.
Rate of A Pressure
at End of Survey
1.16 psi/hr
0.40 psi/hr
0.34 psi/hr
0.78 psi/hr
0.26 psi/hr
0.50 psi/hr
Pressure Gradient
Between Bottom
Two Survey Points
0.325 psi/ft
0.360 psi/ft
0.428 psi/ft
0.325 psi/ft
0.349 psi/it
0.427 psi/It
i 18 psia
D-26RD
2520 l}sia
No P
A D-3!
Dolly Varden Stack up D -'1
Top of Rotary Table
13 5/8"
Hydril 5M
4.54'
Btm of Trolly beam
1.15 Top of drill deck
A 4 1/16" 5M Foster HCRValve
B 4 1/16" 5M Manual gate valve
C 3 1/16" 5M Manual gate Kill line
D 3 1/16" 5M Manual gate Kill line
18.60 to tbg spool
2.0 spacer spool
2.0 spacer spool
1.5' 13 5/8" x 11" xo spook
23'
2000
Jan Feb
Summary by Month'
·
Mar Apr May
Individual Well Production
Jun Jul Aug Sep Oct Nov Dec
Meth Gas Lift Gas Lift
Days 31 29
Oil 7,292 7,850
Wtr 131,281 118,850
Gas 3,639 4,213
2000 Totals: Oil 90,352
2001 Jan Feb
Gas Lift Gas Lift
31 30
8,895 4,480
125,890 111,325
6,161 4,324
Water 1,405,483
Mar Apr
Gas
Gas Lift
31
6,453
114,988
4,965
47,330
May
Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift
30 31 31 29 31 30 31
10,690 8,539 8,268 7,032 8,429 6,363 ~/~ 6,061'N'
108,603 118,938 126,991 103,008 114,455 119,320 ~111,83~,d
2,069 2,124 3,304 3,823 4,682 3,702 ~7324
CumOil 20,302,757 CumWtr 17,033,951
Jun Jul Aug Sep Oct Nov Dec
Meth Gas Lift Gas Lift
Days 27 24
Oil 2,476 3,093
Wtr 76,387 108,450
Gas 1,820 4,991
2001 Totals: Oil 48,726
2002 Jan Feb
Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift
28 8 19 27 30 31 22
6,362 1,786 4,276 3,883 1,813 2,885 3,697
125,377 34,766 80,965 84,298 60,970 68,767 81,193
9,624 3,660 5,817 4,830 4,758 3,319 4,447
Water 1,018,672
Gas 65,011
Cum Oil 20,351,483
Cum Wtr
18,052,623
Gas Lift Gas Lift Gas Lift
26 30 31
4,609 7,348 6,498
97,223 102,777 97,499
5,604 7,036 9,105
Cum Gas 5,260,837
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Meth
Days
Oil
Wtr
Gas
2002
Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift Gas Lift
30 28 31 30 31 30 31 31 30 30 30
5,463 4,821 5,780 4,717 9,353 3,869 6,222 5,863 4,394 3,876 4,220
98,620 90,157 95,913 102,948 86,772 84,395 76,371 59,716 76,180 77,398 75,396
7,965 2,357 4,087 4,971 6,091 5,465 2,876 2,467 4,325 2,285 1,462
Totals: Oil 62,618
Water 1,012,044
Gas
46,598
Cum Oil
20,414,101
Cum Wtr 19,064,667
Cum Gas 5,307,435
Gas Lift
31
2,T47
Friday, January 31, 2003 Page 9
To~
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
January 30, 2003
MWD Formation Evaluation Logs ' 15-45A, AK-MW-00170
!,5-45A:
Digital Log Images
50-029-22671-01
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
JAN 3 1 ZOO3
N~I~ Oil & G~ Co~s.
Permit to Drill 2000680
MD 12906 J TVD
DATA SUBMITTAL COMPLIANCE REPORT
9/9/2002
Well Name/No. PRUDHOE BAY UNIT 15-45A Operator BP EXPLORATION (ALASKA) INC
8838 ..~ Completion Dar 9/8/2000 ~ Completion Statu l-OIL Current Status l-OIL
APl No. $0-029-2267t-01-00
UIC N
REQUIRED INFORMATION
Mud Log N__~o Sample N__~o
Directional Survey
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
Log Log Run
Name Scale Media No
Interval
Start Stop
(data taken from Logs Portion of Master Well Data Maint)
OH I Dataset
CH Received Number Comments
Rpt Ver LIS Verification
ED D Ver LIS Verification
T
D D
R R
R R
C
ED D Ver LIS Verificatiom-------
Rpt Ver LIS Verificatioh''''~''~'~
ED D Ver LIS Verification,.------
Rpt Ver LIS Verifications'"
Log GR Gamma Ray
Log GR Gamma Ray /~
Log GR Gamma Ray
Log GR Gamma Ray'/V/
-ED D - V~, .... ,_,,., Vcrificat~rr~
Rpt Ver LIS Verification-~'"'~
Log GR Gamma Ray~"<7-V~
Log GR Gamma Ray.,/Jut,~
MWD Survey Repo~
MWD Survey Report...~
MWD Survey Report J
10e-35-~
GR/CCL/CNL 2
25
25
25
25
Blu
Blu
Blu
Blu
25 Blu
25 Blu
I 10818
1 10818
95O0
12873 Open
12873 Open
12838 Case
FINAL
FINAL 11200 12906
FINAL 10850 12000
FINAL 9500 12838 ch
FINAL 9500 12838 ch
1 10743 12000 Open
1 10743 12000 Open
1 10798 12906 Open
1 10798 12906 Open
1 10831 12000 Open
1 10831 12000 Open
1 11193 12906 Open
1 11193 12906 Open
~07
1 11558 13007
1 11593 13007
I 11593 13007
6/5/2002
6/5/2002 10847 -"
5/11/2001 10033 9500-12838
2/2/2001 Digital Data
2/2/2001 11200-12906 Paper Copy
2/2/2001 10850-12000 Paper Copy
5/15/2001 10033,--aJSO0-12838 Digital Data
5/15/2001 9500-12838 BL, Sepia
6/24/2002 1100~*"-P B 1
6/24/2002 PB1
6/24/2002 1100~--PB2
6/24/2002 PB2
6/24/2002 PB1
6/24/2002 PB1
6/24/2002 PB2
6~24/2002 PB2
Open~ 6~
Open 6/24/2002 ,~---~ - PB 1
Open 6/24/2002 PB1
Open 6/24/2002 PB1
Well Cores/Samples Information:
Permit to Drill 2000680
MD 12906 TVD
Name
DATA SUBMITTAL COMPLIANCE REPORT
919/2002
Well Name/No. PRUDHOE BAY UNIT 15-45A
Operator BP EXPLORATION (ALASKA) INC
8838
Completion Dat 9/8/2000 Completion Statu 1-OIL Current Status 1-OIL
Interval Dataset
Start Stop Sent Received Number Comments
APl No. $0-029-22671-01-00
UIC N
ADDITIONAL INFORMATION
Well Cored? Y/~
Chips Received? - Y~I-'~
Analysis -Y-/-N'--
R~.c~.iv~.d ?
Daily History Received? t~/N
Formation Tops (~ / N
Comments:
Compliance Reviewed By:
Date:
WELL LOG TRANSMITFAL
To: State of Alaska June 03, 2002
Alaska Oil and Gas Conservation Comm.
Atm.: Lisa Weepie
333 West ./th Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs 15-45A, AK-MW-00170
1 LDWG formatted Disc with verification listing.
API#: 50-029-226714) 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim GalCm
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
4" CtW-
ACTUATOR: BAKER
ES GEMENI'ER
9 g~. 40 ~/ft, L-SO
BUTT. 8HOE
Kopl ~ (H~7Cl) 10e7'~
KOP# 2 (H.~T) 1 o4eo°
MAX ANG: (H-37L1) 98°
MAX ANG: (H.,37) s4o
4,5" 12.6#, L-SO, BUI'T. 'rBG.
TUBINQ ID: 8,958"
OAPACITY: .0152 BBL/FT
GAS LIFT MANDRELS
#1-6; 4.5"X1" KBG-2-L~ -MOD
WI DK-I BTM lATCH [ 3.g09" ID
MD(BKB)
&310'
5755'
7160I
8021'
l'VDss.
3173'
5174'
6321'
7033'
T/34'
7" 26//L-80 BTC,-M
ID: 6.276'
CAP: ,0,.'.'.'.'.'.'.'.'~ BBL/PT
CSG
RA TAG ~ t0107~
4.5' HES X-NIPPLE (8.813' ID)
----.---- 7'X 4.5' BAKER 5-3 PACKER (3.875" ID)
4.5' HE8 X;NtPPI. B (3.813" IO)
4,5' HE$ X- NIPPLE (liP) (S.al~" ID)
4,5~ WLEG
' OPEN HOLE
MILLED WINDOW IN 7" CSG - .,
~ROM ~oS~'. ~o304' NOT~: NO ~~JPP
UNABLE TO SET SLOTTED LINER. SEE DRLG
ia]%~FI~,~~A~ ATORTS FOR MtSO JUNK LEFT IN WELL
ION, SUMMAR ..%.'
~.,,KuR 4.5~X 7" ML
m.875"
4,5" HE$ X-NIPPLE '1 10950'-1
4.5" WLEG ( 4.000" ID )
11290'-11370' OPEN
4 1/2' SHOE 115~5' H-37aLt
PBTD . 11474* 2 Cement
4 1/2" lZ.6~ L*80 IBT-M SOLID
UNER - t0446' - 11565'
TOP OF 4 1/2" LINER H-37
,~ 7" X 5" BAKER ZXP PKR
W/6' TIEBACK SLEEVE
( 5.25" ID ) perfs
wa~rflow I
Dump Flood Peffs
Bridge Plug
,&Hdld;3901;BblD /~lD IJ.LI:J(I HD':IIO~Iqd N~80:2_..0 TO, <:;1:
Schlumberg
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1135
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay & Niakuk
Color
Well Job # Log Description Date Blueline Sepia Prints CD
B-29A 21204 SCMT 04113/01 2
D.S; 15-45A 20392 MCNL 09108100 I I 1
D.S. 15-42A 20307 MCNL · 07116/00 I I 1
D.S. 5-22A 20477 MCNL 11116100 I I 1
D~S. 4-41A 21029 McNL 01107/01 I I 1
OWDW.SW 21149 RST 03/14101 I I 1
NK,12B 21130 OH EDIT IMP & DIN (PDC) 02/24/01 1
NK-12B 21130 MD VISION RES 02/24/01 I 1 '
NK4 2B 21130 TVD VISION RES 02/24/01 1 1
NK-12B 21130 MD VISION D/N ,; 02/24/01 I 1
NK-12B 21130 TVD VISION D/N 02/24/01 I 1
·
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
05/11/01
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
RECEIVED
HAY 1 52001
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Received ~~~' ~__~ ~..~
bp
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
December 15, 2000
Julie Heusser, Dan Seamount, & Cammy Oechsli Taylor
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchoragel AK 99501
Fax 276-7542
Dear Commissioners:
Re: 15-45A Revised Completion Report
Enclosed is a revised 15~45A Completion Report for a CTD Extension. A typo in box 4 was
corrected to reflect the correct section number of the well @ total depth. Two dates in box 27 for
production data were also corrected.
If additional data is needed, please call me at 564-5799 or E-mail me at raufpc@bp.com.
Sincere~l~-~ ~
13~ul C. Rauf ~ "~
Technical Assistant, BPXA
Alaska Drilling & Wells
RECEIVED
DEC I 5 ?nnq
Alaska Ott& Gas Co~s. Commission
Anchorage
,'ATE OF ALASKA Revised 12/13/2000
ALASKA OIL A GAS CONSERVATION COMMISSION (Extension)
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of well Classification of Service Well
Oil r~ Gas D Suspended D Abandoned D Service D
2. Name of Operator ~ ~_i,,'.' '" ~ 7. Permit Number
BP Exploration (Alaska), Inc. ~ ~r, ~P~"3 ~ 200-068/300-222 (signed 8~29/2000)
3. Address ~ :'~'~ i"
~,.i',.';~ .~-~~~j [ 8. APl Number
P. O. Box 196612, Anchorage, AK 99519-6612 ~~.. 50-029-22671-01
4. Location of well at surface 9. Unit or Lease Name
t' ..*J;'.': 'Xt:. ',L:t'~
530' FNL, 5177' FEL, Sec. 22, T11N, R14E, UM (asp's 676014, 5960951) ,~ ..... :,_ .~ Prudhoe Bay Unit
At Top Producing Interval [ O, ;'.~¢~- 10. Well Number
1859' FNL, 2304' FEL, SEC 16, T11N, R14E, UM (asp's 673510, 5964846)~..i~,_:?:: ;5~[":ED ! 15-45A
At Total Depth ~ ~::p~r! I 1. Field and Pool
3115' FNL, 2786' FEL, SEC 16, T11N, R14E, UM (asp's 673060, 5963580)~'~ Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
RKB 67 feetI ADL 28306 Prudhoe Bay Oil Pool
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Su~: Ojr~,Aband. 115. Water Depth, if offshore 16. No. of Completions
May 23, 2000 September 6, 2000 September/~, 2000'1 N/A feet MSL 1
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness o! Permafrost
12906' MD /8838' TVD 12841' MD /8841' TVD YES r~] No E]I 2184' feet MD 1900' (approx)
22. Type Electric or Other Logs Run
MWD GR & Memory CNL
SETTING DEPTH MD t~J I \ I ~J I i '~I/-~ L
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD/ AMOUNT PULLED
20" 91.5# H-40 Surface 110 30" 260 Sx AS
9-5/8" 40# L-80 Surface 3829' 12-1/4" 305 Sx G, 1085 Sx CS III, & 200 Sx CS I
7" 26# L-80 Surface 9258' 8-1/2" 230 Sx Glass G
4-1/2" 12.6# L-80 9080' 10825' 6" 220 Sx Class G
2-7/8" 6.16# L-80 9584' 12906' 3-3/4" 30 bbls of 15.8 ppg LARC
24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 9091' 9056'
11815' - 12250' MD; 8819' - 8846' TVD; @ 4 SPF
12360' - 12420' MD; 8847' - 8846' TVD; @ 4 SPF
12460' - 12820' MD; 8845' - 8842' TVD; @ 4 SPF 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
(See Sidetrack Summary tot details)
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
September 21,2000 Gas Lift
Date of Test Hours Tested Production for OIL-BBL GAS-MOF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
9/23/2000 3.3 Test Pedod >I 962
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MGF WATER-BBL OIL GRAVITY - APl (corr)
Press. -233 psi 24-Hour Rate > 4517 4346 0
28. CORE DATA
*,e, .e.c.,,on o, ,r c, ure , ...re.se.ce o, or w*r. S.m,, ore c... RECEIt 'D
* This 10-407 is submitted as directed per the 10-401 form approved May 18, 2000 D~c
* A 10-403 was submitted for a change of approved program wi approval number 300-222 signed 8~29~2000. .Z
* No 10-407 for P&A operations was submitted because this drilling permit was for an extension.
Ancho~Gas Cons COn~nission
Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate
29. , 30.
GEOLOGIC MARKER ~ FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity.
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top of Sag River Sand 9194' 8227'
Top of Shublik 9224' 8255'
Top of Sadlerochit 9295' 8322'
Top of Zone lA 11450' 8772'
31. LIST OF ATTACHMENTS
Summary of 15-45A CT Sidetrack Drilling Operations + End of Well Survey including 2 plugbacks.
32. I hereby certify that the following is true and correct to the best o! my knowledge.
Prepared by Paul Rauf 564-5799.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
15-45A
DESCRIPTION OF WORK COMPLETED
COILED TUBING EXTENSION DRILLING OPERATIONS SUMMARY
Date Event Summary
4/18/2000:
4/19/2000:
512112000:
5/22/2000:
5~23/2000:
5/24/2000:
5/25/2000:
6~03/2000:
6/12/2000:
6/13/2000:
6/14/2000:
6/15/2000:
6/16/2000:
6/17/2000:
6/18/2000:
6/19~2000:
6/20/2000:
6/21/2000:
6/22/2000:
6/23/2000:
6/24/2000:
6/25/2000:
MIRU service CTU. PT Equip. Killed well. RIH & tagged CIBP @ 10549' MD. Milled CIBP.
Milled / pushed CIBP to 10933' MD. Loaded well w/Crude & POOH. RD.
MIRU service CTU. PT'd equip to 4000 psi. RIH & drifted to 10348' CTM. POOH.
RIH w/Junk Mill / String Reamer & worked to 10900'. POOH - piece of slip recovered in mill.
RIH & set TIW Whipstock Anchor in the 4-1/2" liner @10825' ELM.
MIRU CTU. PT'd equip. RIH & set Whipstock Tray in anchor w/top of Whipstock located @
10825'. POOH. RIH & milled window f/10825' to 10831'. Milled 3' of OH.
RIH w/Crayola mill & dressed window interval. Milled to 10839'. POOH. RD CTU.
PPOT-T to 5000 psi - passed. MITOA to 2000 psi - passed.
MITIA to 3000 psi ~ passed.
MIRU Nabors 3S & CTU #4. BOPE Tested.
RIH & drilled to 10850'. Performed LOT to EMW of 9.61 ppg. Drilled to 11325'.
Drilled to 11470' & POOH. RIH & reamed shaley intervals 11360' - 11380' & 11430' - 11450'.
POOH - became stuck @ 10970'. Freed CT w/Crude.
RIH & drilled to 11669'. POOH. RIH & drilled to 11762'. POOH.
RIH & worked tight spots f/11340' - 11469'. Drilled to 12000'. POOH.
RIH w/CT nozzle to 11455'. Pumped 7 bbls of 17 ppg Class G Cement to plugback OH (15-
45A PB1). Layed in Cement f/11425' - 10950'. Contaminated Cement w/Biozan & jetted
contaminated cement to 11200'. POOH. WOC.
RIH & tagged TOC @ 11193'. Began ST off plugback. Drilled to 11615' & POOH.
RIH & drilled to 11717'. Reamed f/11615' - 11717'. POOH. Began BOPE test.
Completed BOPE test. RIH & drilled to 11929'.
POOH. RIH & drilled to 12308'.
POOH. RIH & drilled to 12433'. POOH.
RIH & drilled to 12798'.
Drilled to TD @ 12906'. CT pin holed @ 12450'. POOH. Swapped CT reel.
RIH & conditioned OH f/Liner run. Reamed @ 12200'. Layed in Crude. POOH w/CT.
Sidetrack Summary Page I
15-45A
DESCRIPTION OF WORK COMPLETED
COILED TUBING EXTENSION DRILLING OPERATIONS SUMMARY
Date Event Summary
6/2612000:
6~27~2000:
612812000:
6/29/2000:
6/30/2000:
7/01/2000:
7/02/2000:
7/03/2000:
9/02/2000:
9/03/2000:
9/0412000:
9/05/2000:
9/06/2000:
9/07/2000:
9/08/2000:
RIH w/2-7/8" FL4S & 3-316" TCII Liner. Liner stuck @ 12491' MD. Unable to free w/Crude.
Disconnected f/deployement sleeve & POOH.
Attempted to recover fish - no recovery. PT'd BOPE. TOL (3-3/16") @ 9147' MD.
RIH w/CS hydril pipe & tubing cutter. Unable to get in liner. POOH.
Cutter left in well as fish. RU SLU. RIH w/LIB & tagged @ 9147'. POOH. RIH & pushed fish
to 9820'. POOH. RD SLU. RIH w/CT & pushed fish to 12158'. POOH.
RIH w/2-7/8" cutter to 12155'. Fired cutter- good shot indication. Jarred on liner- no
movement. POOH. No recovery of fish. RIH w/tubing cutter to 11260'. Fired cutter.
POOH. RIH& latched 2-7/8" liner top @ 10884'. Milled liner. Lost grip on liner. POOH.
RIH & engaged liner. Jarred & liner came free. POOH w/partial fish. All 3-3/16" liner
recovered. Liner parted @ 11260'. 2-7/8" liner in hole as fish f/11260' to 12491'.
Displaced well to water. RDMOL CTU & 3S.
MIRU Nordic 1 CTU f/re-enter/completion. Accept rig 2200 hrs.
PT' BOPE. RIH w/BHA & tagged Whipstock @ 10825'. Logged tie-in down to 11050'. Cut
trough f/11050' to 11080' f/OH ST. Time drilled new OH to 11091'.
Drilled to 11357' & POOH. RIH & drilled to 11629'. POOH.
RIH & reamed/backreamed OH. Swapped to new FIo Pro. Drilled to 12290'.
Drilled to TD @ 12906' MD. Conditioned OH f/liner & POOH. MU liner.
RIH w/2-7/8", 6.16#, STL, L-80 liner & landed it @ 12906'. TOL = 9584'. PBTD = 12846'
(latch collar). Launched ball & verified liner release. Displaced mud to 2% KCL Water.
Pumped 30 bbls of 15.8 ppg Latex Acid Resistive Cement to cement new liner in place, to
isolate the new OH f/the old OH (15-45A PB2) where the original liner was stuck (11050' -
12906'), and to isolate the open perforation intervals in 15-45 f/:
9880'- 10080' MD (Zone lB)
10110' - 10510' MD (Zone 1 B)
10560'- 10770' MD (Zone lB)
10820'- 10890' MD (Zone lB)
Launched dart - bumped plug. Unstung f/liner & POOH. RIH w/BHA & reamed / FCO'd to
PBTD. POOH. MU Mem CNL logging tool string.
RIH & logged well. POOH w/logging tools. RIH w/CT conveyed perforating guns & tagged
PBTD @ 12841'. Shot 855' of initial perforations @:
Sidetrack Summary Page 2
15-45A
DESCRIPTION OF WORK COMPLETED
COILED TUBING EXTENSION DRILLING OPERATIONS SUMMARY
Date Event Summary
9/'09/'2000:
9/13/2000 -
9/14/2000:
11815' - 12250' MD (Zone 1 A)
12360'- 12420' MD (Zone lA)
12460'- 12820' MD (Zone lB)
Used 2" carriers & all shots @ 4 SPF, random orientation, overbalanced press, & 60° phasing.
POOH w/guns - ASF.
FP'd well w/MeOH. RDMOL. Rig released 0800 hrs.
Installed GLV design.
Placed well on production & obtained a valid well test.
Sidetrack Summary Page 3
BP Amoco
WELLPA TH DETAILS
I.~45A
500292267101
Parent Wellpeth: I$-4~APBI
Tle on MD: 11061.00
VartlcMSe~tlonOrlgln: Slot.4$(O. O0, O. O0)
Vartlcel Sectlon Angle: 20~.$2°
Rig: No~dic I
Depth Reference: 63: 45 9/24/1996 16:29
REFERENCE INFORMATION
Co-ordinate (N/E) Reference: Well Centre: 16-45, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference; Slot - 45 (0.00,0.00)
Measured Depth Reference: 63: 45 9/2411996 16:29 68.1
Calculation Method: Minimum Curvature
ANNOTATIONS
NO. TVO MD Ann0talk3n
8694.86 tto61.CO Kk:k~llPoinl
2 8770.21 12906.(~o Projected to TO
BPAmoco
4500'"i
BAKER /
LEGEND
15-45.15-45A.P~ #10
15-45 (1~-45)
15-45 15-45APBt
15-45 (lS-45PB11
15-45A
4000 .......................................................
i I 15-45 (16-45PB1) }-,,
I ~s-46 (16-45) I i
............ ......... ~/' \~1 '.
i ,PB1
15-45 (15-45APB1) H
. 3500'""I
838 '""i
8576
'"~ 1~45'(15-45PB1 ::
~ ~ ~ ........... ~ · ~ ...................................... ~
8771 "'"~'~ .................~"' ~: - 7
-2729 -2534 -2339 -2144 -1949 -1754 -1559 -1364 -1170 -975 VeRlcal Section at 209,B2' [ff]
Prepared by Baker Hughes INTEQ
ESl
INTEQ
End of Well Survey Calculations
Coordinates provided in: TRUE and GRID relative to Wellhead
and ALASKA STATE PLANE
Company: BP Exploration Alaska, Inc. Rig: Nabors 3S
Field: Prudhoe Bay Unit RKB Height: 68.060
Well: 15-45APB1 (Drilled from 1~45) Vertical Sect. Plane: 209.520
Job No: 48635 Mag. Declination: 27.142
AFE No: AP-1534 Grid Correction: 1.340
API No: 50-029-22671-71 Job Start Date: i-~,,I~O.i::iiii::iiii::il
BHI Rep: iC~iDiip."p;iK;iE~glii~iiiiiili,ililili Job End Date: 125~J"~'i~iiii?:.ii
Survey Date:
Survey Type: :::::::::::::::::: :::::i~::ii::i:'
Incl. TRUE TRUE Subsea Coords. - True Coords. - ASP Dogleg
Angle Azi. V. Depth TVD N(+)/S(-) E(+)/W(-) N(+)/S~) E(+)/W(-) Severi~
(de~) (de~) (~) (~) (ft) (~) Lat. (Y) DeF. OX) (°/100ft)
90.40 264.77 8774.85 8706.79 4293.09 -1999.47 5965197.29 673915.101 0.00
97A0 264.50 8770.84 8702.78 4287.59 -2058.04 5965190.42 673856.681 11.87
95.50 261.30 8766.45 8698.39 4282.80 -2096.49 5965184.731 673818.35 9.50
90.80 256.40 8763.60 8695.54 4272.76 -2147.40 5965173.50 673767.70 13.04
90.60 252.20 8763.18 8695.12 4263,56 -2180.12 5965163.54 673735.20 12.37
90.50 247.60 8762.92 8694.86 4254.28 -2205.47 5965153.67 673710.08 17.04
93.50 238.50 8760.89 8692.83 4228.05 -2257.08 5965126.24 673659.10 16.51
94.601 234.60 8758.56 8690.50 4209.91 -2284.54 5965107.46 673632.07 12.25
90.50 229.70 8756.42 8688.36 4180.50 -2322.38 5965077.17 673594.93 13.30
90.50 229.70 8755.97 8687.91 4146.86 -2362.04 5965042.63 673556.08 0.00
89.60 241.00 8755.92 8687.86 4112.81 -2411.32 5965007.42 673507.61 18.89
87.60 243.40 8756.99 8688.93 4092.29 -2450.22 5964986.01 673469.20 7.10
84.50 239.90 8759.54 8691.481 4074,77 -2482.70 5964967.73 673437.15 12.62
84.60 235.00 8762.77 8694.711 4056.57 -2511.22 5964948.86 673409.06 14.35
85.50 238.10 8765.45' 8697.39 4039.55 -2536.98 5964931.25 673383.70 10.38
85.30 239.20 8767.29 8699.23 4027.62 -2556.56 5964918.86 673364.41 4.85
85.10 235.00 8769.14 8701.08 4015.71 -2574.97 5964906.53 673346.29 19.05
82.30 230.40 8773.97 8705.91 3989.23 -2609.75 5964879.24 673312.15 12.18
82.50 226.90 8778.33 8710.27 3967.62 -2634.30 5964857.06 673288.11 10.53
83.80 222.00 8784.66 8716.60 3930.06 -2671.13 5964818.66 673252.17 9.50
86.00 220.60 8786.52 8718.46 3914.35 -2684.94 5964802.63 673238.73 12.40
87.70 213.90 8787.95 8719.89 3893.70 -2700.64 5964781.61 673223.52 26.55
89.10 199.10 8789.05 8720.99 3858.91 -2717.98 5964746.43! 673207.00 38.10
88.20 192.10 8789.83 8721.77 3827.15 -2726.85 5964714.48! 673198.88 21.38
85.50 183.60 8791.20 8723.14 3802.45 -2730.26 5964689.70 673196.05 35.62
75.90. 168.20 8797.54 8729.48 3764.22 -2727.59 5964651.55 673199.61 46.05
67,60 164.70 8805.36 8737.30 3741.16 -2722.05 5964628.63 673205.69 35.76
56.10 162.60 8821.37 8753.31 3712.44 -2713.65 5964600.11 673214.76 34.26
47.90 164.30 8835.52 8767.46 3695.08 -2708.48 5964582.88 673220.33 36.12
38.30 165.40 8856.67 8788.61 3675.98 -2703.29 5964563.91 673225.97 33.20
28.70 168.50 8878.33 8810.27 3662.04 -2700.01 5964550.04 673229.58 37.49
23.10 175.20 8893.62 8825.56 3654.70 -2698.92 5964542.74 673230.84 37.12
23.10 175.20 8921.22 8853.16 3642.98 -2697.93 5964531.04 673232.10 0.00
Meas.
Depth
(ft)
10850.00
10909.00
10948.001
11000.00
11034.00
11061.00
11119.00
11152.00
11200.00
11252.00
11312.00
11356.00
11393.00
11427.00
11458.00
11481.00
11503.00
11547.00
11580.00
11633.00
11654.00
11680.00
11719.00
11752.00
11777.00
11816.00
11841.00
11875.00
11898.00
11927.00
11953.00
11970.00
12000.00
Vertical
Section
(~)
4639.98
4670.41
4689.45
4711.68
4723.76
4731.39
4741.02
4742.79
4741.68
4738.25
4740.21
4746.88
4752.13
4754.47
4756.13
4758.19
4759.58
4758.99
4756.24
4747.98
4743.5'7
4736.32
4718.6[
4698.44
4680.62
4648.31
4626.48
4598.4(
4581.3~
4562.94
4549.7~
4543.2?
4533.25
INTEQ
Company:
Field:
Well:
Job No:
AFE No:
API No:
BHI Rep:
End of Well Survey Calculations
Coordinates provided in: TRUE and GRID relative to Wellhead
and ALASKA STATE PLANE
BP Exploration Alaska, Inc.
Prudhoe Bay Unit
15-45APB2 (Drilled from I~&~APB I)
48635
AP-1534
50-029-22671-72
Rig: Nabors 3S
RKB Height: 68.060
Vertical Sect. Plane: 209.520
Mag. Declination: 27.142
Grid Correction: 1340
·
Job Start Date: :::::::::::::;/::::::
Job End Date: :~Sjii~:O0:!ii:;i:i:{i'
Survey Date: ::~¢J~a;~Oiil}:i:?i:
Survey Type: :M~:: :ii::5:1:::/:i:::
Meas.
Depth
(ft)
11200.00
11228.00
11256.00
11296.00
11325.00
Incl.
Angle
(del~)
90.50~
81.70
75.50
66.00
67.20
TRUE
Azi.
(de~)
229.70
229.00
229.30
238.80
238.50
TRUE
V. Dep~
(~)
8756.42
8758.33
8763.86
-' 8777.06
8788.57
Subsea
TVD
(ft)
8688.36
869O.27
8695.8O
8709.00
8720.51
Coords.
N(+)/S(-)
(ft)
4180.50
4162.32
4144.37
4122.18
4108.34
Trlle
E(+)/W(-)
fit)
-2322.38
-2343.56
-2364.31
-2394.75
-2417.48
Coords.- ASP
N(+)/S(-)
Lat. (Y)
5965077.17
5965058.51
5965040.08
5965017.19
5965002.81
E(+)/W(-)
DeF. (X)
673594.93
673574.1'
673553.87
673523.96
673501.56
Dogleg
Severity
(°/100ft)
13.30
31.53
22.17
32.64
4.25
Vertical
Section
4590.701
4592.98!
4595.12
4601.16
4607.59
11354.00 72.40 237.10 8798.59 8730.53 4093.84 -2440.49 5964987.78 673478.89 18.49 4613.76
11384.00 78.40 234.30 8806.15 8738.09 4077.48 -2464.46 5964970.86 673455.32 21.94 4619.30
11410.00 84.10 232.20 8810.10 8742.04 4062.11 -2485.04 5964955.01 673435.11 23.33 4623.13
8744.01
8744.72
8745.12
8746.83
11439.00
11467.00
11494.00
11526.00
238.10
242.00
250.10
4045.59
4031.62
4020.67
4009.69
3996.60
3986.25
3970.74
3949.99
3926.80
249.70
241.70
238.80
233.60
221.60
11558.00
11579.00
-2508.77
-2533.01
-2557.67
-2587.67
-2616.65
-2634.77
-2657.93
-2680.66
-2695.81
11607.00
88.10
89.00
89.30
8812.07i
8812.78
8813.18
5964937.95
5964923.41
5964911.89
5964900.21
5964886.45
5964875.67
5964859.63
5964838.36
5964814.82
8814.89
8818.24
8820.50
8823.09
8826.29
673411.77
673387.86
673363.47
673333.74
673305.0'
673287.20
673264.41
673242.17
673227.58
84.60
83.40
84.20
85.2O
83.00
11638.00
8750.18
8752.44
8755.03
8758.23
8761.59
11666.00 83.30 204.70 8829.65
11681.00 85.40 199.10 8831.13 8763.07 3912.96 -2701.37 5964800.85 673222.34
11709.00 88.50 187.50 8832.63 8764.57 3885.80 -2707.79 5964773.55 673216.56
11736.00! 91.90 185.40 8832.53 8764.47 3858.97 -2710.82 5964746.66 673214. t6
11768.00 92.90 184.40 8831.19 8763.13 3827.12 -2713.55 5964714.76 673212.17
5964683.81
92.60
11799.00
11837.00
11871.00
3796.20
3758.24
3724.27
3681.42
3640.80
181.90
180.10
177.70
174.50
8761.64
8760.12
8758.87
5964645.85
5964611.91
5964569.14
673211.20
673211.42
673212.87
8756.96
8755.53
8829.70
8828.18
8826.93
8825.02
8823.59
170.60
11914.00
11955.00
92.00!
92.20:
92.90
91.10
673216.80
673223.06
-2715.25
-2715.91
-2715.26
-2712.34
11991.00 89.70 169.20 8823.34 8755.28 3605.36
12018.00 88.20 165.00 8823.83 8755.77 3579.06
12042.00 86.10 165.70 8825.03 8756.97 3555.87
3528.91
85.60
8827.05
8758.99
-2707.03
5964528.66
-2700.72 5964493.38 673230.20
-2694.69 5964467.2~2 673236.84
-2688.63 5964444.18! 673243.44
5964417.40
-2681.33
673251.37
12070.00 164.00
12103.00 84.10 160.80 8830.01 8761.95 3497.59 -2671.39 5964386.32 673262.03
12129.00 83.80 157.60 8832.76 8764.70 3473.42 -2662.21 5964362.38 673271.78
-2650.91
85.20
160.80
165.00
5964332.88
5964301.73
8835.82
673283.78
5964212.53
673294.17
8838.96!
83.90
12161.00
12194.00
8767.76
-2641.25
12286.00
24.54
14.29
30.02
14.74
25.14
14.25!
18.83
39.15
59.93
4628.39
4635.81
4645.64
-2622.92
8770.90
3443.65
3412.26
12218.00 84.70 167.50 8841.34 8773.28 3389.06 -2635.57 5964278.67 673300.38i
12253.00 83.90 168.90 8844.82 8776.76 3354.97 -2628.45 5964244.76 673308.301
85.10 3322.60 673314.59!
4659.26
4670.67
4676.27
4681.84
4683.41
4677.88
39.70 4672.10
42.82 4657.57
14.80 4640.87
4.42 4620.41
8.11 4599.89
4.99 4573.67
7.08 4549.32
7.61 4517.11
10.47 4484.78
5.50 4455.37
16.51 4432.59
9.22 4411.98
6.31 4387.83
10.67 4358.75
12.29 4335.23
10.87 4306.25
13.27
4277.31
10.89 4256.97
4.59 4227.94
9.20 4201.24
171.70 8847.98 8779.92
12319.00 86.50 174.20 8850.40 8782.34 3289.94 -2618.88 5964179.98 673319.39: 8.66 4175.41
12349.00 88.90 175.90 8851.60 8783.54 3260.08 -2616.29 5964150.19 673322.681 9.80 4152.55
12381.00 91.70 177.70 8851.44 8783.38 3228.13 -2614.51 5964118.29 673325.21 10.40 4128.8~
12420.00 93.70 181.90 8849.60 8781.54 3189.19 -2614.37 5964079.36 673326.26 11.92 4101.3~
184.00
12457.00
12487.00
12514.00
12541.00
12577.00
673325.23
673323.11
673320.12
673316.48
673310.44
94.50
93.10
8846.95
8844.96
8843.76
8843.08
8842.67
92.00
90.90
90.40
8778.89
8776.90
8775.7(
5964042.48
5964012.62
5963985.82
5963959.08
5963923.60
8775.02
6.06
10.42
7.81
5.51
7.90
8774.61
3152.33
3122.54
-2616.27
-2619.09
-2622.70
-2626.97
-2633.84
3095.81
3069.16
3033.82
186.80
188.60
189.60
192.40
4076.8(
4057.8(
4041.67
4025.9J
4005.9~
Meas. Incl. TRUE TRUE Subsea Coords. - True Coords. - ASP Dogleg Vertical
Depth Angle Azi. V. Depth TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section
(ft) (de~) (deg) (ft) (ft) (ft) (ft) Lat. (Y) DeD. (X) (°/100ft)
12606.00 92.20 194.50 8842.01 8773.95 3005.63 -2640.58 5963895.25 673304.36 9.54 3990.94
12641.00 91.90 200.90 8840.76 8772.70! 2972.33 -2651.21 5963861.71 673294.51 18.29 3975.09
12676.00 91.80 199.50 8839.63 8771.57 2939.50 -2663.29 5963828.61 673283.21 4.011 3960.60
12706.00 91.20 201.20 8838.84 8770.78 2911.38 -2673.72 5963800.26 673273.44 6.011 3948.24
12736.00 88.90 203.30 8838.82 8770.76 2883.62 -2685.07 5963772.24 673262.74 10.38 3936.80
12770.00 86.30 204.70 8840.24 8772.18 2852.59 -2698.89 5963740.90 673249.65 8.68 3924.81!
12798.00 87.60 206.50! 8841.73 8773.67 2827.37 -2710.97 5963715.41 673238.17 7.92 3915.67
12827.00~ 86.80 209.30 8843.15 8775.09 2801.78 -2724.52 5963689.50 673225.22 10.03 3907.31
12852.00! 87.20 211.80' 8844.46 8776.40 2780.28 -2737.21 5963667.72 673213.04 10.11 3901.22
12906.00 87.20! 211.80 8847.10 8779.04 2734.44 -2765.63 5963621.23 673185.70 0.00 3889.20
North Slope Alaska
Alaska State Plane 4
PBU_EOA DS 15
15.45A
Surveyed: 6 September, 2000
$ UR VEY REPORT
2 October, 2000
Your Reft API.500292267101
Surface Coordinates: 5960952.49 N, 676014.44 E (70° 17' 56.0994" N, 148° 34' 28.0019" ViO
Kelly Bushing: 68.06ft above Mean Sea Level
Survey Reft svyf0483
Sperry-Sun Drilling Services
Survey Report for '15-45A
Your Ref: API,500292267101
Surveyed: 6 September, 2000
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
11034,00 90.600 252.200 8695.13 8763.19
11061.00 90.500 247.600 8694.87 8762.93
11091.28 90.350 246.520 8694.64 8762.70
11129.08 86.660 236.500 8695,63 8763.69
11160.28 90.180 231.930 8696.49 8764.55
11193.48 89.910 224.020 8696.47 8764.53
11223.08 88.580 220.230 8696.86 8764.92
11261.28 87.540 211.710 8698.15 8766.21
11294.28 85.960 202.920 8700.03 8768.09
11326.48 86.570 193.780 8702.13 8770.19
11358.73 88.940 189.560 8703.39 8771.45
11406.13 90.970 194.480 8703.43 8771.49
11443.13 87.190 196.240 8704.02 8772.08
11472.33 84.370 201.690 8706.17 8774.23
11507.33 85.430 204.680 8709.29 8777.35
11546.13 83.410 211.540 8713.06 8781.12
11580.73 82.700 216.110 8717.25 8785.31
11618.73 83.500 217.690 8721.81 8789.87
11649.53 82.970 221.380 8725.44 8793.50
11689.33 80.420 226.300 8731.19 8799.25
11724.53 80.160 231.930 8737.14 8805.20
11754.73 81.300 242.470 8742.01 8810,07
11784.13 81.210 237.900 8746.49 8814.55
11822.93 82.620 235.620 8751.94 8820.00
11865.33 85.430 228.590 8756.36 8824.42
Local Coordinates
Global Coordinates
Nothings Eastings Nothings Eastings
(~) (~) (~) (~)
4263,52 N 2180.52W 5965163.76 N 673734.66
4254.24 N 2205.86W 5965153.90 N 673709.54
4242.44 N 2233.75W 5965141.44 N 673681,94
4224.44 N 2266.91W 5965122.68 N 673649.20
4206.21N 2292.20W 5965103.86 N 673624.35
4184.00 N 2316.85W
4162.06 N 2336.69W
4131.19 N 2359.10W
4101.95 N 2374.20W
4071.48 N 2384.31W
4039.93 N 2390.82W
3993.59 N 2400.69W
3957.92 N 2410.49W
3930.39 N 2419.94W
3898.35 N 2433.67W
3864.31N 2451.85W
3835.78 N 2470.96W
3805.62 N 2493.61W
3782.03 N 2513.08W
3753.64 N 2540.34W
3730.93 N 2566.56W
3714.82 N 2591.58W
3700.37 N 2616.78W
3679.32 N 2648.91W
3653.43 N 2682.16W
5965081.08 N 673600.23
5965058.67 N 673580.90
5965027.29 N 673559.23
5964997.70 N 673544.81
5964967.01N 673535.42
5964935.31 N 673529.65
5964888.75 N 673520.87
5964852.86 N 673511.91
5964825.12 N 673503.10
5964792.77 N 673490.13
5964758.31N 673472.75
5964729,35 N 673454.31
5964698.66 N 673432.38
5964674,62 N 673413.47
5964645.59 N 673386.88
5964622.29 N 673361.20
5964605.59 N 673336.56
5964590.56 N 673311.70
5964568.75 N 673280.08
5964542.09 N 673247.45
Alaska State Plane 4
PBU_EOA DS 15
Dogleg Vertical
Rate Section
(°/100ft) (ft)
E -2635.64
E 17.040 -2615.08
E 3.601 -2591.07
E 28,235 -2559.07
E 18.482 -2530.75
E 23.839 -2499.28
E 13.568 -2470.40
E 22.456 -2432.50
E 27.020 -2399.61
E 28.388 -2368.12
E 14.998 -2337.46
E 11.228 -2292.27
E 11.269 -2256.40
E 20.968 -2227.79
E 9.032 -2193.15
E 18.350 -2154.57
E 13.271 -2120.33
E 4.634 -2082.92
E 12.021 -2052.80
E 13.808 -2014.66
E 15.782 -1981.99
E 34.649 -1955.63
E 15.366 -1930.65
E 6.859 -1896.49
E 17.770 -1857.58
Comment
Tie-on Survey
Window Point
Continued...
2 October, 2000 - 22:21 ,2 - DrillQuest ~1,05.05
Sperry-Sun Drilling Services
Survey Report for 15-45A
Your Ref: API.500292267101
Surveyed: 6 September, 2000
North Slope Alaska
Measured
Depth Incl. Azim.
(ft)
119o7,13 85.17o 224.720
11937.13 85.690 219.45o
11969,93 86.920 213.640
12oo4.13 87,630 208.020
12o38.13 87,450 203.270
Sub-Sea Vertical Local Coordinates
Depth Depth Nothings Eastings
(ft) (ft) (fi) (fi)
8759.79 8827,85 3624.84 N 2712.45W
8762.18 8830.24 3602.66 N 2732.48W
8764.30 8832.36 3576.37 N 2751.96W
8765.92 8833.98 3547.05 N 2769.46W
8767.38 8835.44 3516.43 N 2784.16W
12072.53 86.660 201.160 8769.15 8837.21
12105.33 86.220 196.590 8771.19 8839.25
12136.33 86.920 191.850 8773.05 8841.il
12168.53 87.270 187.450 8774.68 8842.74
12198.33 87.100 184.470 8776.14 8844.20
12228.33 88.330 181.300 8777.34 8845.40
12260.53 89.210 177.080 8778.03 8846.09
12294.53 89.560 170.230 8778.39 8846.45
12329.73 88.820 162.540 8778.89 8846.95
12367.33 90.180 158.630 8779.22 8847.28
12397.53 91.320 159.500 8778.83 8846.89
12431.73 92.460 164.950 8777.70 8845.76
12466.33 92,110 170.400 8776.32 8844.38
12513.13 90.970 177.790 8775.06 8843.12
12559.73 91.490 181.130 8774.06 8842.12
12602.13 90.880 182.710 8773.18 8841.24
12632.53 89.820 189.390 8772.99 8841.05
12674.33 88.940 194.840 8773.45 8841.51
12707.73 89.030 198.350 8774.04 8842.10
12740.93 89.120 203.450 8774.57 8842.63
3484.63 N 2797,15W
3453.66 N 2807.74W
3423.68 N 2815.33W
3391.98 N 2820.72W
3362.38 N 2823.81W
3332.45 N 2825,32W
3300.27 N 2824.87W
3266.50 N 2821.11W
3232.31N 2812.83W
3196.86 N 2800.34W
3168.66 N 2789.55W
3136,12 N 2779.12W
3102.36 N 2771.74W
3055,86 N 2766,93W
3009.28 N 2766.49W
2966.91 N 2767.91W
2936.70 N 2771,11W
2895.85 N 2779.88W
2863.85 N 2789.42W
2832.85 N 2801.26W
Global Coordinates
Nothings Eastings
(ft) (fi)
5964512.80 N 673217.83
5964490.15 N 673198,32
5964463.42 N 673179.46
5964433.70 N 673162.66
5964402,75 N 673148.68
5964370.65 N 673136.44
5964339.44 N 673126,58
5964309.28 N 673119.69
5964277.47 N 673115.04
5964247.81N 673112.65
5964217.85 N 673111.84
5964185.68 N 673113.05
5964152.01N 673117.59
5964118.03 N 673126,67
5964082.88 N 673139.99
5964054.94 N 673151.44
5964022.66 N 673162.63
5963989.08 N 673170.80
5963942.70 N 673176.69
5963896.14 N 673178.22
5963853.75 N 673177.79
5963823.48 N 673175.30
5963782.43 N 673167.49
5963750.22 N 673158.71
5963718.95 N 673147.60
Alaska State Plane 4
PBU_EOA DS 1 $
Dogleg Vertical
Rate Section
(°ll00ft) (ft)
E 9,248 -1817.78
E 17.596 -1788,60
E 18.070 -1756.13
E 16.545 -1721,99
E 13,968 -1688,11
E 6.542 -1654.04
E 13.971 -1621.87
E 15.429 -1592.04
E 13.690 -1561,80
E 10.004 -1534.52
E 11.326 -1507,73
E 13.384 -1479.95
E 20.172 -1452.41
E 21.945 -1426,75
E 11.009 -1402.05
E 4.748 -1382.83
E 16.272 -1359.66
E 15.771 -1333.91
E 15.971 -1295.81
E 7.252 -1255.50
E 3.994 -1217.93
E 22.248 -1190.06
E 13.206 -1150.19
E 10.511 -1117.65
E 15.362 -1084.84
Comment
Continued...
2 October, 2000.22:21 .3- DrillQuest 1.05.05
Sperry-Sun Drilling Services
Survey Report for 15-45A
Your Ref: API-500292267101
Surveyed: 6 September, 2000
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth incl. Azim. Depth Depth Nothings Eastings
(~) (~) (~) (~) (~)
12781.33 91.230 208.900 8774.45 8842.51 2796.61 N 2819.07W
12814.53 91.580 212.240 8773.64 8841.70 2768.03 N 2835.95W
12843.33 91.930 217.160 8772.75 8840.81 2744.37 N 2852.33W
12876.53 92.460 220.320 8771.48 8839.54 2718.50 N 2873.09W
12906.00 92.460 220.320 8770.22 8838.28 2696.05 N 2892.14W
Global Coordinates
Nothings Eastings
(ft) (~)
5963682.30 N 673130.64 E
5963653.34 N 673114.44 E
5963629.30 N 673098.61E
5963602.95 N 673078.47 E
5963580.06 N 673059.95 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Dogleg
Rate
(°llOOft)
14.465
10.112
17.118
9.644
0.000
Alaska State Plane 4
PBU_EOA DS 15
Vedical
Section Comment
(fi)
-1044.53
-1011.35
-982.69
-949.95
-921.02 Pr~ected Su~ey
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well Reference and calculated along an Azimuth of 209.520° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12906.00ft.,
The Bottom Hole Displacement is 3953.88ft., in the Direction of 312.990° (True).
Continued...
2 October, 2000.22:21 .4 - DrillQuest f.05,05
Sperry-Sun Drilling Services
Survey Report for 15.45A
Your Ref: API-500292267101
Surveyed: 6 September, 2000
North Slope Alaska
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
11034.00 8763.19 4263.52 N 2180.52 W
11061.00 8762.93 4254.24 N 2205.86 W
12906,00 8838.28 2696.05 N 2892.14 W
Survey tool program
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
0.00 0.00 12906.00 8838.28
Comment
Tie-on Survey
Window Point
Projected Survey
Survey Tool Description
MWD Magnetic
Alaska State Plane 4
PBU_EOA DS 15
2 October, 2000 - 22:21 .5 - DrillQuest f.05,05
BP Amoco
Baker Hughes INTEQ Survey Report
~ PI3 DS 15 ' Ye~lml ('~)~ 63;: 45 9/24/1996 16:29 68.1
WeE: 15-45' ~ OrS);~ Well (O.OOF_.,O,(ION,314.68Azi)
FieM: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Ceo Datum: NAD27 (Clad(e 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2000
Site: PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Nm-thing:
From: Map Easttng:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5958837.36 ft Latitude: 70 17 35.236 N
676296.98 It Lon~itude: 148 34 21.213 W
North Reference: True
GrM Convergence: 1.34 deg
Weft: 15-45 Slot Name: 45
15-45
Weft Position: +N/-S 2121.31 ft Northing: 5960952.49 It Latitude: 70 17 56.099 N
+E/-W -232.87 ft East-lng: 676014.44 ft Longitude: 148 34 28.002 W
Position Uncertainty: 0.00 ff
Wellpath: 15-45APB2 Drilled From: 15-45APB1
500292267172 Tie-on Depth: 11200.00 tt
Current Datum: 63: 45 9124/1996 16:29 Height 68.06 It Above System Datum: Mean Sea Level
Magnetic Data: 101912000 Declination: 26.93 deg
FieM Strength: 57481 nT Mag Dip Angle: 80.79 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ff ff ff deg
0.00 0.00 0.00 314.68
Survey: MWD Start Date: 6/25/2000
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Annotation
Survey
11200.00 90.50 229.70 8756.42 8668.36 4180.50 -2322.38 5965077.17 673594.93
11228.00 81.70 229.00 8756.33 8690.27 4162.32 -2343.56 5965058.51 673574.19
11256.00 75.50 229.30 8763.86 8695.80 4144.37 -2364.31 5965040.08 673553.87
11296.00 66.00 238.80 8777.06 8709.00 4122.18 -2394.75 5965017.19 673523.96
11325.00 67.20 238.50 8788.57 8720.51 4108.34 -2417.48 5965002.81 673501.56
11354.00 72.40 237.10 8798.59 8730.53 4093.84 -2440.49 5964987.78 . 673478.89
11364.00 78.40 234.30 8806.15 8738.09 4077.48 -2464.46 5964970.86 673455.32
11410.00 64.10 232.20 8810.10 8742.04 4062.11 -2485.04 5964955.01 673435.11
11439.00 68.10 238.10 8812.07 8744.01 4045.59 -2508.77 5964937.95 673411.77
11467.00 89.00 242.00 8812.78 8744.72 4031.62 -2533.01 5964923.41 673387.86
11494.00 89.30 250.10 8813.18 8745.12 4020.67 -2557.67 5964911.89 673363.47
11526.00 64.60 249.70 8814.89 8746.83 4009.69 -2587.67 5964900.21 673333.74
11556.00 83.40 241.70 8818.24 8750.18 3996.50 -2616.65 5964886.45 673305.07
11579.00 84.20 238.80 8820.50 8752.44 3986.25 -2634.77 5964875.67 673287.20
11607.00 85.20 233.60 8823.09 8755.03 3970.74 -2657.93 5964859.63 673264.41
11638.00 83.00 221.60 8826.29 8758.23 3949.99 -2680.66 5964838,36 673242.17
11686.00 83.30 204.70 8829.65 8761.59 3926.80 -2695.81 5964814.82 673227.58
11 68 1.00 85.40 199.10 8831.13 8763.07 3912.96 -2701.37 5964800.85 673222.34
0.00
31.53
22.17
32.64
4.25
18.49
21.94
23.33
24.54
14.29
30.02
14.74
25.14
14.25
18.83
39.15
59.93
39.70
4590.70
4592.98
4595.12
4601.16
4607.59
4613.76
4619.30
4623.13
4628.39
4635.81
4645.64
4659.26
4670.67
4676.27
4681.64
4683.41
4677.88
4672.10
BP Amoco
Baker Hughes INTEQ Survey Report
' ' Vc,,qJcai ~)~ 63:459/24/199616:2968.1
1~: : ~ ~ Sedi~m('v'~i~,~erem~x~: ~ Well (0.00E.0.00N,314,68Azi)
,~:
Survey
11709.00 88.50 187.50 8832.63 8764.57 3885.80 -2707.79 5964773.55 673216.56 42.82 4657.57
11736.00 91.90 185.40 8832.53 8764.47 3858.97 -2710.82 5964746.66 673214.16 14.80 4640.87
:
11768.00 92.90 184.40 8831.19 8763.13 3827.12 -2713.55 5964714.76 673212.17 4.42 4620.41
11799.00 92.60 181.90 8829.70 8761.64 3796.20 -2715.25 5964683.81 673211.20 8.11 4599.89
11637.00 92.00 180.10 8828.18 8760.12 3758.24 -2715.91 5964645.85 673211.42 4.99 4573.67
11871.00 92.20 177.70 8826.93 8758.87 3724.27 -2715.26 5964611.91 673212.87 7.08 4549.32
11914.00 92.90 174.50 8825.02 8756.96 3681.42 -2712.34 5964569.14 673216.80 7.61 4517.11
11955.00 91.10 170.60 6823.59 8755.53 3640.80 -2707.03 5964528.66 673223.06 10.47 4484.78
11991.00 89.70 169.20 6823.34 8755.28 3605.36 -2700.72 5964493.38 673230.20 5.50 4455.37
12018.00 68.20 165.00 6823.83 8755.77 3579.06 -2694.69 5964467.22 673238.84 16.51 4432.59
12042.00 86.10 165.70 6825.03 8756.97 3555.87 -2688.63 5964444.18 673243.44 9.22 4411.98
12070.00 85.60 164.00 6827.05 8758.99 3528.91 -2681.33 5964417.40 673251.37 6.31 4387.63
12103.00 64.10 160.80 8830.01 8761.95 3497.59 -2671.39 5964386.32 673262.03 10.67 4358.75
12129.00 83.80 157.60 8832.76 8764.70 3473.42 -2662.21 5964362.38 673271.78 12.29 4335.23
12161.00 85.20 160.80 8835.82 8767.76 3443.65 -2650.91 5964332.88 673263.78 10.87 4306.25
12194.00 83.90 165.00 6838.96 8770.90 3412.26 -2641.25 5964301.73 673294.17 13.27 4277.31
12218.00 64.70 167.50 8841.34 8773.28 3389.06 -2635.57 5964278.67 673300.38 10.89 4258.97
12253.00 83.90 168.90 8844.82 8776.76 3354.97 -2628.45 5964244.76 673308.30 4.59 4227.94
12286.00 85.10 171.70 8647.98 8779.92 3322.60 -2622.92 5964212.53 673314.59 9.20 4201.24
12319.00 86.50 174.20 6850.40 8782.34 3289.94 -2618.88 5964179.95 673319.39 8.66 4175,41
12349.00 68.90 175.90 6851.60 8763.54 3260.08 -2616.29 5964150.19 673322.68 9.80 4152.57
12381.00 91.70 177.70 6851.44 8763.38 3228.13 -2614.51 5964118.29 673325.21 10.40 4128.84
12420.00 93.70 181.90 8849.60 8781.54 3189.19 -2614.37 5964079.36 673326.26 11.92 4101.36
12457.00 94.50 164.00 8846.95 8778.89 3152.33 -2616.27 5964042.48 673325.23 6.06 4076.80
12487.00 93.10 186.80 8844.95 8776.90 3122.54 -2619.09 5964012.62 673323.11 10.42 4057.86
12514.00 92.00 168.60 8843.76 8775.70 3095.81 -2622.70 5963985.62 673320.12 7.81 4041.63
12541.00 90.90 189.60 8643.08 8775.02 3069.16 -2626.97 5953959.08 673316.48 5.51 4025.93
12577.00 90.40 192.40 8842.67 8774.61 3033.82 -2633.64 5963923.60 673310.44 7.90 4005.97
12606.00 92.20 194.50 8642.01 8773.95 3005.63 -2640.56 5963895.25 673304.36 9.54 3990.94
12641.00 91.90 200.90 8640.76 8772.70 2972.33 -2651.21 5963861.71 673294.51 18.29 3975.09
12676.00 91.80 199.50 8839.63 8771.57 2939.50 -2663.29 5963828.61 673263.21 4,01 3960.60
12706.00 91.20 201.20 8838.84 8770.78 2911.38 -2673.72 5963800.26 673273.44 6.01 3948.24
12736.00 68.90 203.30 8838.82 8770.76 2883.62 -2685.07 5963772.24 673262.74 10.38 3936.80
12770.00 86.30 204.70 8840.24 8772.18 2852.59 -2698.89 5963740.90 673249.65 8.68 3924.81
12798.00 87.60 206.50 8841.73 8773.67 2827.37 -2710.97 5963715.41 673238.17 7.92 3915.67
12627.00 86.80 209.30 8843.15 8775.09 2801.78 -2724.52 5963689.50 673225.22 10.03 3907.31
12852.00 87.20 211.80 8844.46 8776.40 2780.28 -2737.21 5963667.72 673213.04 10.11 3901.22
12906.00 87.20 211.80 8847.10 8779.04 2734.44 -2765.63 5953621.23 673185.70 0.00 3889.20
REFERENCE INFORMATION
Co-ordinete (N/E) Reference: Well Cenlre: 15-45, True North
Verticel (TVD) Reference: System: Meen See Level
Seclien (VS) Reference: Slot - 45 (0.00,0.00)
MeemJred Depth Reference: 63: 45 9124/1006 16:29 68.1
Calculetion Method: Minimum Curvelure
NdNOTATIONa
No. '~O ~ Annotalion
I 8694.$6 11061.O0 KlCk-offPoint
2 0770.21 1290600 PrqectedtoTD
ii i i i i i i i iii Illl
T,~q[GET DETNL$
BPAmoco I BAKER /
[INTEQ /
LEGEND
1E-45,15~5A. Plnn #10
15-45 (15-45)
15,.45 (15-45AP~1)
15-45 (15-45AP~2)
1546 (15-45PG1)
T J Wellpalk: ( 15-45/15-4J^}
~ Azimuths to Truc North
I\ M4agnctic North: 26.93°1 C'rcalgd By: arij Poblis Onlg: 10/9/2000
I
~/" Masnctic Field I ~.~ ~ ~lr~ a~' ·
l! Strength: 57481nT
/1~",. Dip Anglc: $0.791
~ Datc: I 0/9/2000
-2729 -2534 -2339 -2144 -1949 -1754 -1559 -1364 -1170 -975
Vertical Section at 209.52* [ft]
Plot 1/22/2001 2:03 PM
Obp
( BP Amoco (
Baker Hughes INTEQ Survey Report
Db: 0rac~
Field: Prudhoe Bay
North Slope
UNITED STATES
Map S~stem:US State Plane Coordinate System 1927
Gee Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zaae: Alaska, Zone 4
Coordtaate System: Well Centre
Geomapetie Model: BGGM2000
Site: PB DS 15
TR-11-14
UNITED STATES: North Slope
Site Position: Northlag:
From: Map Eastlag:
Position Uncertainty: 0.00 ft
Ground Level: 0,00 ff
5958837.36 fi Latitude: 70 17 35.236 N
676296.98 fi Longitude: 148 34 21.213 W
North Reference: True
GrM Convergence: 1.34 deg
WeB: 15-45 Slot Name: 45
15-45
WeH Posttton: +N/-S 2121.31 ft Northing: 5960952.49 fi Latitsde: 70 17 56.099 N
+E/-W -232.87 ft Easttng: 676014.44 fi Longitude: 148 34 28.002 W
Position Uncertainty: 0.00 ft
WeHpath: 15-45APB1 Drilled From: 15-45
500292267171 Tie-on Depth: 10850.00 fi
Current Datum: 63: 45 912411996 16:29 Height 68.06 fi Above System Datum: Mean Sea Level
Magnetic Data: 10/9/2000 Deellaation: 26.93 deg
Field Strength: 57481 nT Mag DIp Angle: 80.79 deg
Vertical Section: Depth From (TVD) +NI-S +FJ-W Diroetton
ff ff' ff deg
0.00 0.00 0.00 323.48
Survey: MWD Start Date: 6/16/2000
Company: Baker Hughes INTEQ Engtaeer:
Tool: MWD,MWD - Standard Tlod-to: From: Definitive Path
Annotation
,
10850.00 8774.85 Kick-off Point
12000.00 8921.22 Projected to TD
Survey
10850.00 90.40 264.77 8774.85 8706.79 4293.09 -1999.47 5985197.29 673915.10 0.00 4639.98
10909.00 97.40 264.50 8770.64 8702.78 4287.59 -2058.04 5985190.42 673856.68 11.87 4670.41
10948.00 95.50 261.30 8766.45 8698.39 4282.80 -2096.49 5985184.73 673818.35 9.50 4689.45
11000.00 90.80 256.40 8763.60 8695.54 4272.76 -2147.40 5965173.50 673767.70 13.04 4711.68
11034.00 90.60 252.20 8763.18 8695.12 4263.56 -2180.12 5985163.54 673735.20 12.37 4723.76
11061.00 90.50 247.60 8762.92 8694.86 4254.28 -2205.47 5965153.67 673710.08 17.04 4731.39
11119.00 93.50 238.50 8760.89 8692.63 4228.05 -2257.08 5965126.24 673659.10 16.51 4741.02
11152.00 94.60 234.60 8758.56 8690.50 4209.91 -2284.54 5965107.46 673632.07 12.25 4742.79
11200.00 90.50 229.70 8758.42 8688.36 4180.50 -2322.38 5965077.17 673594.93 13.30 4741.68
11252.00 90.50 229.70 8755.97 8687.91 4146.86 -2362.04 5965042.63 673556.08 0.00 4738.25
11312.00 89.60 241.00 8755.92 8687.86 4112.81 -2411.32 5985007.42 673507.61 18.89 4740.21
11356.00 87.60 243.40 8756.99 8688.93 4092.29 -2450.22 5964986.01 673469.20 7.10 4746.88
11393.00 84.50 239.90 8759.54 8691.48 4074.77 -2482.70 5964967.73 673437.15 12.62 4752.13
11427.00 84.60 235.00 8762.77 8694.71 4056.57 -2511.22 5964948.86 673409.06 14.35 4754.47
11458.00 85.50 238.10 8765.45 8697.39 4039.55 -2536.98 5964931.25 673383.70 10.38 4756.13
11481.00 85.30 239.20 8767.29 8699.23 4027.62 -2556.56 5964918.86 673364.41 4.85 4756.19
11503.00 85.10 235.00 8769.14 8701.08 4015.71 -2574.97 5964906.53 673346.29 19.05 4759.58
11547.00 82.30 230.40 8773.97 8705.91 3989.23 -2609.75 5964879.24 673312.15 12.18 4756.99
BP Amoco
Baker Hughes INTEQ Survey Report
Compaay: BP Amcx~ Date:. 1/22/2001 Time: 13:57:49 Pa~e: ~
~!: ~Bay : C,-mdlaail~']~) ~: ~i!: 1545, Trim Noflh
PB DSlfi : Ym,'ilcd ~ ~ 6~: 45 9/24/1~6 16:29 68.1
WeB: 15-45~:~ ~::Sec.o. mCV~Rderem~ ' ~ WelI(0.00E,0.00N~323.48AzJ)
Wi~l~h: 15-~!! :i:r i ' ~ Oracle
Survey
i MtpE DiS VS
11580.00 82.50 226.90 8778.33 8710.27 3967.62 -2634.30 5964857.06 673288.11 10.53 4756.24
11633.00 83.80 222.00 8784.66 8716.60 3930.06 -2671.13 5964818.66 673252.17 9.50 4747.98
11654.00 86.00 220.60 8786.52 8718.46 3914.35 -2684.94 5964802.63 673238.73 12.40 4743.57
11680.00 87.70 213.90 8787.95 8719.89 3893.70 -2700.64 5964781.61 673223.52 26.55 4736.32
11719.00 89.10 199.10 8789.05 8720.99 3858.91 -2717.98 5964746.43 673207.00 38.10 4718.68
11752.00 88.20 192.10 8789.83 8721.77 3827.15 -2726.85 5964714.48 673198.88 21.38 4698.44
11777.00 85.50 183.60 8791.20 8723.14 3802.45 -2730.26 5964689.70 673198.05 35.62 4680.62
11816.00 75.90 168.20 8797.54 8729.48 3764.22 -2727.59 5964651.55 673199.61 46.05 4648.31
11841.00 67.60 1 64.70 8805.36 8737.30 3741.16 -2722.05 5964628.63 673205.69 35.76 4626.48
11875.00 58.10 162.60 6821.37 8753.31 3712.44 -2713.65 5964600.11 673214.76 34.26 4598.40
11898.00 47.90 164.30 8835.52 8767.46 3695.08 -2708.48 5964582.88 673220.33 38.12 4581.38
11927.00 38.30 165.40 6858.67 8768.61 3675.98 -2703.29 5964563.91 673225.97 33.20 4562.94
11953.00 28.70 168.50 6878.33 6810.27 3662.04 -2700.01 5964550.04 673229.58 37.49 4549.78
11970.00 23.10 175.20 6893.62 6825.56 3654.70 -2698.92 5964542.74 673230.64 37.12 4543.23
12000.00 23.10 175.20 8921.22 8853.16 3642.98 -2697.93 5964531.04 673232.10 0.00 4533.22
BP Amoco
WELLPA TH DETAILS
16-4~A
500292267101
Parent Wellpath: 15-45APB1
TieonMD: 11061.00
Vertical Seclfon Origin: Slot. 45 (0.00,0.00)
Vertical Section An~le: 209.52°
Rig: Nonfic 1
Dep~ R~ce: 63: 45 912411996 16:29
Co-ordinate (N/E) Reference: Well Cenlre: 15-45, True Norlh
Vertical ('FVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 45 (0.00,0.00)
Measured Deplh Reference: 63: 45 912411996 16:29 68.1
Calculation Method: Minimum Curvature
68.06ft
REFERENCE INFORMATION
ANNOTATIONS
No. ~ ~ AnnotlbOn
I 06~4.86 11061.00 Kk~-offPollt
2 8770.21 12906.0O proje~tedtoTD
I
.... 25oo [ i i : u~: i [ : ~ i i : i i i ~ :
-3500 ~ -2~ -2~ -1~ -1~ ~
_ ~ ,/~/ W~ff-)~+) [~n]
: "'-- N
-2729 -25~ -2339 -21~ -1~9 -17~ -1559 -13~ -1170 -975 Ve~l ~bn a 2~,5~ [~]
Plot 1/22/2001 2:03 PM
STATE OF ALASKA
SKA OIL AND GAS CONSERVATION COM olON
APPLICATION FOR SUNDRY APPROVALS
1. Type of request:
Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _
Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _
Change aPProved program _X Pull tubing _ Variance _ Perforate _
Other_
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
530' FNL, 5177' FEL, Sec. 22, T11 N, R14E, UM
At top of productive interval
2294' FNL, 1184' FEL, SEC. 16, T11N, R14E, UM
At effective depth
At total depth
1538' FNL, 2097' FEL, Sec. 16, T11N, R14E, UM
5. Type of Well:
Development _X
Exploratory __
Stratigraphic _
Service__
(asp's 676014, 5960951)
(asp's 674641, 5964438)
(asp's 673185, 5963619)
6. Datum elevation (DF or KB feet)
RKB 67 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
15-45A
9. Permit number / approval number
200-068 (Signed 5/18/2000)
10. APl number
50-029-22671
11. Field / Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 3762'
Production 9191'
Liner 1980'
Liner 1231'
12901 feet Plugs (measured) AUG ?- 2 ZOO0
8714 feet ,~.i~S~ ~,J','~ ~ ~,a~ CONS. C0~~
12491 feet Junk(measured) A~~
8845 feet
Size Cement~ Measured Depth True vertical Depth
20" 260 Sx AS 110' 110'
9-5/8" 3O5 Sx G, ~085 Sx CS m, & 200 3829' 3829'
SxCSI
7" 230 Sx Glass G 9258' 8287'
4-1/2" 220 sx c~a~ G 11060' 8784'
2-7/8" Un~mented & stuck 11260' - 12491' 8766' - 8845'
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth
Packers & SSSV (type & measured depth)
9880'-10080'; 10110'-10510'. 10560'-10770'; 10820'-10890'; Open Holef/10831'-11260'.
8786' - 8786'. 8786' - 8783'; 8782' - 8777'; 8776' - 8775'; Open Hole f/8775' - 8766'.
4-1/2", 12.6#, L-80 Tbg @ 9091' MD. ORIGINAL
7" X 4-1/2" BAKER S-3 PACKER @ 9056' MD.
4-1/2" HE$ HXO SVLN $SSV @ 2184' MD.
13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __
15. Status of well classification as:
14. Estimated date for commencing operation
September 8, 2000
16. If proposal was verbally approved
Name of approver
Date approved
Oil __X Gas __ Suspended __
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Ted
~('/~ ~'&'?~'~ FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representat~ may witness
BOP Test __" Location clearance _
Questions? Call Ted Stagg @ 564-4694.
Date ~/~r~"'/~r~
Prepared by Paul Rauf 564-5799.
Approval no.
Plug integrity __
Mechanical Integrity Test _
Approved by order of the Commission
Subsequent form required 10- I~ ~
Commissioner
Date
Form 10-403 Rev 06/15/88 ·
ORIGINAL SIGNED BY
D Taylor Seamount
pproved Copy,
"Returned
I I
SUBMIT IN TRIPLICATE
ObP
To:
Blair Wondzell
Sr. Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Ted Stagg
CTD Engineer
Date: August 22, 2000
Re: Well 15-45a Change of Program \ ¢,',q'(St¢
Arco's coil drilling rig, Nabors 38, began 15-45a coil sid~perations on 6/12/00 after window milling was
done by service coil. After drilling to the planned target~he 2 7/81' liner was run and stuck off bottom. Liner
recovery efforts resulted in the liner being cut below the window leaving a 2 7/8" liner fish from 11,260 to 12,491.
The window is at 10,824'-10,830'. On 7/3/00 Nabors 3S moved off the well leaving the window accessible for
future drilling operations.
SLB/Nordic 1 coil drilling rig is scheduled to continue operations on 15-45a on approx. Sept. 8, 2000. The plan
forward is as follows:
(1) Lay cement from top of fish (11,260') to window (10,830').
(2) Drill 3.75" hole to same TD as originally approved on Permit 200-068.
(3) Complete with 2 7/8" liner cemented with approx. 15 bbls cement and 3 3/16" liner cemented with
approx. 11 bbls cement as described on Permit 200-068. The 3 3/16" liner will cover existing
perforations in the 4 1/2" liner of 15-45.
(4) Perforate Zone 1 for production.
Ted Stagg
CTD Drilling Engineer
CC: Well File
Petrotechnical Data Center
RECEIVED
AUG 2£ 2000
Alaska 0ii & Gas Cons. Commission
Anchorage
2 3/8" CT --~1
Pack-Off
CT Drilling & Completion BOP
LU
1 2"
36"
22.5"
18"I
38" i--
7 1/16"
Annular
7 1/16' 5000 psi
Blind/Shear
7 1/16"
Pipe/Slip --- 2 3/8"
J.] I ~,,- ....... I I .
I~, , __ u~/:x~...oo, o.,~_ _
. . '--"TEE
7 1/16' X 5,000 psi ~
~1111 ~.~ 2 7/8"
~1~ ~ 2 3/8"
Slips
7 1/16"
Pipe
7 1/16' x 5,000 psi
SWAB OR MASTER VALVE
RECEIVED
AUG 22 2000
Alaska 07~ & Gas Co;ts. Gommission
ALASKA OIL AND GAS
CONSERVATION COI~ISSION
TONY ICNOWLE$, G~)VERNOR
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Lamar L. Gantt
Coil Tubing Drilling Supervisor
ARCO Alaska, Inc.
P O Box 100360
Anchorage, AK 99510-0360
Re:
Prudhoe Bay Unit 15-45A
ARCO Alaska, Inc.
Permit No: 200-068
Sur Loc: 530'FNL, 5177'FEL, Sec. 22, T 11N, R14E, UM
Btmhole Loc. 2973'FNL, 2394'FEL, Sec. 16, T11N, RI4E, UM
Dear Mr. Gantt:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Robert N. Christenson, P.E.
Chair
BY ORDER OF THE,~OMMISSION
DATED this [ ~ ~ day of May, 2000
dlffEnclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
DS 1545A Permit to Drill
Subject: DS15-45A Permit to Drill
Date: Tue, 16 May 2000 15:17:32-0900
From: "Danny T Kara" <DKARA~ppco.com>
To: blair_wondzell~admin, state.ak.us
Blair,
Schedules have changed such that we would like to initiate milling operations in
well 15-45 this coming Friday, 5/19/2000. I would appreciate it if you could
review the plan for extending this horizontal well and if possible, approve it
by Friday. As we discussed on the phone, we will perform a leak-off test after
drilling -10' of new formation. I will be sure to include this in the
procedure.
AOGCC also has a proposed plan for extending Prudhoe well 15-42. The 15-42 and
15-45 extensions are very similar and contain the same verbage in the Intended
Procedure of the permit to drill. Therefore, I will also include a leak-off
test in the 15-42 drilling procedure.
I would appreciate notification if it appears that 15-45 permit approval will
not be likely by Friday.
Thanks for your help.
Dan Kara
Phillips Alaska, Inc
263-4837
1 of 1 5/16/00 4:28 PM
PERMIT TO DRILL
20 AAC 25.005
RECEIVE
MAY 05
Alaska 0il & Gas Cons. Commission
la. Type ofwork: Ddll [-~ Reddll ~] I lb. Type ofwell. Exploratory ~] Stratigraphic Test ~ Developme[~~~
Re-entty r'l Deepen DI Sen/ice D Development Gas D Single Zone ~1 Multiple Zone D (EXTENSION)
~.~ame of Operator 5. Datum elevation (DF or KB) 10. Field and Pool
'""--~Alaska, Inc..~._ RKB 67 feet
3. Address 6. Properly Designation Prudhoe Bay Field
P.O. Box 100360 Anchorage, AK 99510-0360 ADL 28306 Prudhoe Bay Oil Pool
4. Location o! well at surface ~, ~-- ,~' 7. Unit or property Name 11. Type Bond (see 20 AAC 25.0251)
530' FNL, 5177' FEL, Sec. 22, T11N, R14E, UM Prudhoe Bay Unit Statewide
At top o! productive interval 8. Well number Number
2294' FNL, 1184' FEL, SEC. 16, T11N, R14E, UM 15-45A #U-630610
At total depth 9. Approximate spud date Amount
2973' FNL, 2394' FEL, Sec 16, T11N, R14E, UM May 31,2000 $200,000
12. Distance to nearest property line I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 28305, 2887' OTD feetI No Close Approach feet ! 2560 13281 MD / 8827 TVD
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth: 11060' MD Maximum hole angle 90° Maximum surface 2450 psi~l At total depth (TVD) 3300 psi~l @ 8867'
18. Casing program Settin~l Depth
size Specifications Top Bottom Quant~ of Cement
Hole Casin~l Wei~lht Grade Couplin~l Len~h MD TVD MD TVD (include sta~le data)
3-3/4" 3-3/16" 6.2 L-80 TCll 1600' 9400' 8418' 11000' 8779' 11 bbls
3-3/4" 2-7/8" 6.4 L-80 FL4S 2281' 11000' 8779' 13281' 8827' 16 bbls
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total Depth: measured 11060 feet Plugs (measured) Tagged PBTD @ 10933' MD on 4/19/2000.
tree vertical 8784 feet
Effective Depth: measured 10933 feet Junk (measured) ClBP pushed to BTM @ 10933' MD.
true vertical 8776 leer
Casing Length Size Cemented Measured depth True Vertical depth
Conductor 110' 20" 260 Sx AS 110' 110'
Surface 3762' 9-5/8" 305 Sx G, 1085 Sx CS III, & 200 Sx CS I 3829' 3829'
Production 9191' 7" 230 Sx Glass G 9258' 828?
· ,n r ORIGINAL
Perforation depth: measured 9880'- 10080'; 10110'- 10510'. 10560'- 10770'; 10820'- 10890'.
true vertical 8786' - 8786'. 8786' - 8783'; 8782'- 8777'; 8776' - 8775'.
20. Attachments Filing lee ~] Property Plat r-] BoP Sketch [~ Diverter Sketch r'l Drilling program
Drilling fluid program Time vs depth plot D Refraction analysis D Seabed report ~1 20 AAC 25.050 requirements D
21. I hereby certify that the foregoing is true and correct to the best of my knowledge Questions? Call Dan Kara @ 263-4837.
Signed ~~ ~.~ Title: CoilTubing Drilling Supervisor Date
Prepared b)/ Paul Rauf 263-4990
Commission Use Only
Permif Numb,~_.~) _~)~:::) ~ I APl number _ ~/ Approval ISee cover letter
· 50' ~) ~"~'~" ~"~' ~:~'7 ~/-- ~) I I dar e~'~'~'/tt~''~} I'°r °thor requirements
Conditions of approval Samples required D Yes ~ No Mud log required~_z D Yes [] No
Hydrogen sultidemeasures ~Yes D No Directional surveyrequired J~ Yes D No
Required working pressure for BOPE F"]2M; r"l 3M; D 5M; D 1oM;r-1 r'~'13500 psi for CTU
Other:
ORIGINAL SIGNED'BY by order of
Approvedby ~-~.,~ I~1 ~k~,,e'~--~.~-- Commissioner the commission Date ,~"~'
Form 10-401 Rev. 12/1/85 · Submit in triplicate
DS 15-45A
CT Sidetrack and Completion
Intended Procedure
Objective:
Drill an extension from the existing wellbore to reach new target. A P&A will
not be required. Existing perforations to be isolated with cement behind CT
installed liner.
Intended Procedure:
Attempt to mill through landing collar, float collar and float shoe with
service CTU. If unsuccessful, install mechanical whipstock at -10,900'
(above landing collar) and mill window in 4-1/2" liner with service CTU.
Since perforations are open a leak-off test will not be performed as it will
not be meaningful.
Directionally drill a 3-3/4" well to access Zone 1 reserves.
Run 3-3/16" blank liner across perforated interval, crossover to 2-7/8" in
openhole. Cement in place.
Run memory CNL, perforate -1500 fi, place on production.
NOTE: Drill cuttings will be disposed of at GNI and drilling mud will be disposed at GNI or
Pad 3.
RECEIVED
MAY 05 2000
Alaska Oil & Gas Cons. Cormissior~
Anchorage
May 5, 2000
DS 15-45A
Potential Drilling Hazards
POST ON RIG
H2S production is not anticipated from this well. Continue to ensure all H2S
monitoring equipment is operational.
BHP: 3300 psi @ 8800' ss (7.2 ppg EMW), BHT 200 °F
(estimated pressure). No over-pressured zones are anticipated.
Maximum anticipated WHP w/full column of gas: 2450 psi.
High perm intervals are expected across the Sadlerochit.
No major faults are anticipated. The well will be drilled with 8.5 ppg mud.
RECEIVED
F~IAY 05 2000
~aska Oi~ & Gas Co~s. Co~mission
Anchorage
May 4, 2000
SSSVN @ 2184'
9-5/8" Shoe @ 3829'
4-1/2", 12.6#, L-80 Production Tubing to Surface
05 2000
Alaska Oit & Gas Cons. Cor~]missio~
Anchorage
X Nipple
@ 9079'
7" x 4-1/2" Baker S-3 Packer @ 9056'
4-1/2" TT / 4-1/2" Liner Top @ 9091'
7" Shoe @ 9258'
4-1/2" Liner
3-3/16"X 2-7/8" XO @
~ 11000'
3-3/16" TCII Liner Top Above
Existing Perfs @ 9400'
Existing 4-1/2" Perfs Isolated
Behind 3-3/16" w/Cement
/
2-7/8" FL4S
Liner Cemented
& Perf'd
3-3/4" Open hole
TD @ 13281'
4-1/2" Shoe @ 11060' PCR 5/5/2000
ARCO Plan.xlt
8200-
-
8300-
-
8400-
-
8500-
8600-
8700-
_
8800-
-
8900-
Structure: D.5. 15 Well : 15-45A Plan, 50-029-22671-01
Field · Prudhoe Bay Location : North Slope, Alaska
<- West (feet)
4200 4000 3800 36100 5400 32100 30?0 2800 26100 24100 2'100 20100 1800 1600 14100 12100
I I I I I I I I I I I I I I I I I I I I I I , 4600
4400
~,.~ 4200
\ 4000
2
TD
, , , ,
2400 2300 2200 2100 2000 1900 1800
, , , , , , , , , , ,
3800 5700 3600 3500 3400 3500 5200 3100 5000 2900 2800 2700 2600 2500
Vertical Section (feet) ->
Azimuth 195.00 with reference 0.00 N, 0.00 E from 15-45
3800
.
.36oo
.
-3400
3200
3000
.
- 2800
2600
.
- 2400
RECEIVED
MAY 05 2000
Prepared by BH105/04/2000
Alaska Oil & Gas Cons. Commission
Anchorage
Proposal Calculations
HU~t~.._~$ Coordinates provided in: TRUE and GRID relative to Wellhead
and ALASKA STATE PLANE
Company: _ Alaska~ Inc. Vertical Sect. Plane: 195.000 TRUE Job No: 0
Fidd: Prudhoe Bay~ Alaska Mag. Declination: 27.200 AFE No: 0
Well: 15-45A Version#1 Grid Correction: 1.340 API No: 50-029-22671-01
Rig: Nabors 3S Total Correction: 25.860 BHI Rep: 0
Surface Location Dip: 80.720 Job Start Date: 00-Jan-00
X: 676014.3 RKB Height: 67.100 Job End Date: 00-Jan-00
Y: 5960950.8
Meas. Incl. TRUE Subsea Coords.- True Coords.- ASP Dogleg Vertical Tool Face Build Turn
Depth Angle Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments
(de~) (de~) (ft) Lat. (Y) Dep. (X) Lat. (Y) Dep. (X) (°/100ft) /W~lheadl (°/100ft) (°/100ft~
10975.87 86.09 263.99 8710.42 4281.17 -2124.78 5965180.78 673790.02 0.00 -3585.36 -117.00 0.00 0.00 Tie-in Point
11000.00 85.94 263.70 8712.09 4278.59 -2148.72 5965177.64 673766.16 1.34 -3576.67 -117.00 -0.62 -1.20
11000.80 85.94 263.69 8712.15 4278.50 -2149.51 5965177.54 673765.37 1.34 -3576.38 -117.00 0.00 -1.25
11020.28 85.82 263.46 8713.55 4276.33 -2168.82 5965174.91 673746.12 1.34 -3569.29 0.00 -0.62 -1.18
11025.80 85.82 263.46 8713.95 4275.70 -2174.29 5965174.16 673740.67 0.00 -3567.27 0.00 0.00 0.00
11050.80 85.82 263.46 8715.77 4272.86 -2199.06 5965170.74 673715.97 0.00 -3558.11 0.00 0.00 0.00
11060.00 85.82 263.46 8716.44 4271.82 -2208.17 5965169.48 673706.88 0.00 -3554.74 92.00 0.00 0.00 Kick-offPoint
11075.80 85.77 264.81 8717.60 4270.21 -2223.85 5965167.50 673691.25 8.50 -3549.13 92.00 -0.32 8.54
11100.00 85.70 266.87 8719.40 4268.46 · -2247.92 5965165.19 673667.23 8.50 -3541.21 91.00 -0.29 8.51
11100.80 85.70 266.94 8719.46 4268.41 -2248.71 5965165.13 673666.44 8.50 -3540.96 91.00 0.00 8.75
11125.80 85.63 269.07 8721.36 4267.54 -2273.62 5965163.67 673641.55 8.50 -3533.67 91.00 -0.28 8.52
11150.80 85.57 271.20 8723.27 4267.60 -2298.55 5965163.15 673616.63 8.50 -3527.28 91.00 -0.24 8.52
11175.80 85.51 273.33 8725.22 4268.58 -2323.45 5965163.55 673591.72 8.50 .3521.78 91.00 -0.24 8.52
11190.00 85.48 274.54 8726.34 4269.55 -2337.57 5965164.19 673577.58 8.50 -3519.06 -88.00 -0.21 8.52 1
11200.00 85.51 273.64 8727.12 4270.26 -2347.52 5965164.67 673567.62 8.97 -3517.18 -88.00 0.30 -9.00
11200.80 85.51 273.57 8727.18 4270.31 -2348.31 5965164.70 673566.82 8.97 -3517.02 -88.00 0.00 -8.75
11225.80 85.59 271.32 8729112 4271.37 -2373.21 5965165.18 673541.91 8.97 -3511.60 -87.00 0.32 -9.00
11250.80 85.68 269.07 8731.03 4271.46 -2398.14 5965164.68 673516.99 8.97 -3505.23 -87.00 0.36 -9.00
11275.80 85.77 266.82 8732.89 4270.57 -2423.05 5965163.20 673492.10 8.97 -3497.92 -87.00 0.36 -9.00
11300.00 85.87 264.65 8734.65 4268.77 -2447.12 5965160.84 673468.09 8.97 -3489.95 -87.00 0.41 -8.97
11300.80 85.87 264.58 8734.71 4268.~/0 -2447.92 5965160.75 673467.29 8.97 -3489.68 -87.00 0.00 -8.75
11325.80 85.98 262.33 8736.49 4265.85 -2472.69 5965157.33 673442.60 8.97 -3480.52 -87.00 0.44 -9.00
11350.80 86.09 260.08 8738.22 4262.04 -2497.33 5965152.94 673418.05 8.97 -3470.46 -87.00 0.44 -9.00
11375.80 86.21 257.84 8739.90 4257.26 -2521.81 5965147.59 673393.69 8.97 -3459.51 -86.00 0.48 -8.96
11400.00 86.33 255.67 8741.48 4251.73 -2545.32 5965141.51 673370.32 8.97 -3448.08 -86.00 0.50 -8.97 ~1~.~_~ i~i~
11400.80 86.33 255.59 8741.53 4251.53 -2546.09 5965141.29 673369.55 8.97 -3447.69 -86.00 0.00 -10.00 Il ~lk~'.~.~ ~ · .....
11425.80 86.46 253.35 8743.10 4244.85 -2570.13 5965134.05 673345.68 8.97 -3435.01 -86.00 0.52 -8.96
11450.80 86.59 251.11 8744.61 4237.24 -2593.89 5965125.88 673322.10 8.97 -3421.51 -86.00 0.52 -8.96 ~/I^¥ f~ .l~ ~{]~
11475.80 86.73 248.87 8746.07 4228.70 -2617.34 5965116.80 673298.86 8.97 -3407.19 -86.00 0.56 -8.96
11500.00 86.87 246.70 8747.42 4219~56 -2639.71 5965107.14 673276.72 8.97 -3392.58 -86.00 0.58 -8.97 _A o .... ~'- ....... ~
11500.80 86.88 246.62 8747.46 4219.24 -2640.44 5965106.81 673275.99 8.97 -3392.08 -86.00 1.25 -10.00 ~il~kel Oil &'°'
11525.80 87.03 244.38 8748.79 4208.89 -2663.16 5965095.93 673253.52 8.97 -3376.20 -86.00 0.60 -8.96 ~O~
Meas. Incl. TRUE Subsea Coords.- True Coords.- ASP Dogleg Vertical Tool Face Build Turn
Depth Angle Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments
(de~) (de~) (ft) Lat. (~) Dep. O0 [~. (~) Dep. O0 (°/lOOft) /Wellheadt[ (°/lOOft) (°/1001~)
11550.80 87.18 242.14 8750.05 4197.66 -2685.45 5965084.18 673231.50 8.97 -3359.58 -85.00 0.60 -8.96
11575.80 87.34 239.90 8751.24 4185.56 -2707.30 5965071.57 673209.94 8.97 -3342.24 -85.00 0.64 -8.96
11600.00 87.50 237.73 8752.33 4173.05 -2727.98 5965058.58 673189.56 8.97 -3324.80 -85.00 0.66 -8.97
11600.80 87.51 237.66 8752.37 4172.62 -2728.65 5965058,13 673188.90 8.97 -3324.21 -85.00 1.25 -8.75
11625.80 87.67 235.42 8753.42 4158.85 -2749.49 5965043.88 673168.39 8.97 -3305.52 -85.00 0.64 -8.96
11650.80 87.84 233.19 8754.40 4144.28 -2769.78 5965028.84 673148.45 8.97 -3286.19 -85.00 0.68 -8.92
11675.80 88.01 230.95 8755.30 4128.92 -2789.48 5965013.02 673129.11 8.97 -3266.26 -85.00 0.68 -8.96
11700.00 88.19 228.78 8756.11 4113.33 -2807.97 5964997.01 673110.99 8.97 -3246.41 -85.00 0.74 -8.97
11700.80 88.19 228.71 8756.13 4112.80 -2808.58 5964996.46 673110.40 8.97 -3245.75 . -85.00 0.00 -8.75
11725.80 88.37 226.47 8756.88 4095.95 -2827.02 5964979.19 673092.36 8.97 -3224.70 -85.00 0.72 -8.96
11750.801 '88.55 224.24 8757.55 4078.39 -2844.80 5964961.22 673074.99 8.97 -3203.13 -85.00 0.72 -8.92
11775.80! 88.74 222.00 8758.14 4060.15 -2861.89 5964942.58 673058.34 8.97 -3181.09 -85.00 0.76 -8.96
11800.001 88.92 219.84 8758.64 4041.87 -2877.73 5964923.94 673042.93 8.97 -3159.33 -85.00 0.74 -8.93
11800.80! 88.92 219.77 8758.66 4041.25 -2878.25 5964923.31 673042.43 8.97 -3158.61 -85.00 0.00 -8.75
11825.80 89.11! 217.53 8759.09 4021.73 -2893.86 5964903.43 673027.28 8.97 -3135.71 -85.00 0.76 -8.96
11850.80 89.30 215130 8759.43 4001.62 -2908.69 5964882.97 673012.92 8.97 -3112.44 -85.00 0.76 -8.92
11875.80 89.49 213.06 8759.70 3980.94 -2922.74 5964861.97 672999.37 8.97 -3088.83 -85.00 0.76 -8.96
11900.00 89.67 210.90 8759.88 3960.41 -2935.55 5964841.15 672987.04 8.97 -3065.69 -85.00 0.74 -8.93
11900.80 89.68: 210.83 8759.88 3959.72 -2935.96 5964840.46 672986.64 8.97 -3064.92 -85.00 1.25 -8.75
11925.80 89.871 208.59 8759.98 3938.01 -2948.35 5964818.46 672974.77 8.97 -3040.74 -85.00 0.76 -8.96
11943.11 90.00 207.04 8760.00 3922.70 -2956.43 5964802.97 672967.05 8.97 -3023.86 -90.00 0.75 -8.95 2
11950.80 90.00 206.47 8760.00 3915.84 -2959.89 5964796.02 672963.75 7.46 -3016.33 -90.00 0.00 -7.41
11975.80 90.00 204.61 8760.00 3893.28 -2970.67 5964773.22 672953.51 7.46 -2991.75 -90.00 0.00 -7.44
12000.00 90.00 202.80 8760.00 3871.12 -2980.40 5964750.85 672944.30 7.46 -2967.83 -90.00 0.00 -7.48
12000,80 90.00 202.74 8760.00 3870.38 -2980.71 5964750.10 672944.01 7.46 -2967.04 -90.00 0.00 -7.50
12025.80 90.00 200.88 8760.00 3847.18 -2989.99 5964726.68 672935.27 7.46 -2942.22 -90.00 0.00 -7.44
12050.80 90.00 199.01i 8760.00 3823.68 -2998.52 5964702.99 672927.29 7.46 -2917.31 -90.00 0.00 -7.48
12075.80 90.00 197.15 8760.00 3799.91 -3006.28 5964679.05 672920.09 7.46 -2892.35 -90.00 0.00 -7.44
12100.00 90.00 195.351 8760.00 3776.68 -3013.05 5964655.67 672913.87 7.46 -2868.16 -90.00 0.00 -7.44
12100.80 90.00 195.29 8760.00 3775.91 -3013.26 5964654.89 672913.67 7.46 -2867.36 -90.00 0.00 -7.50
12125.80 90.00 193.42 8760.00 3751.69 -3019.46 5964630.54 672908~04 7.46 -2842.36 -90.00 0.00 -7.48
12150.80 90.00 191.56i 8760.00 3727.28 -3024.87 5964606.01 672903.21 7.46 -2817.38 -90.00 0.00 -7.44
12175.80 90.00 189.69 8760.00 3702.71 -3029.48 5964581.34 672899.18 7.46 -2792.46 -90.00 0.00 -7.48
12200.00 90.00 187.89 8760.00 3678.80 ,3033.17 5964557.35 672896.04 7.46 -2768.40 -90.00 0.00 -7.44
12200.80 90.00 187.83 8760.00 3678.00 -3033.28 5964556.55 672895.95 7.46 -2767.61 -90.00 0.00 -7.50
12225.80 90.00 185.97 8760.00 3653.19 -3036.29 5964531.67 672893.53 7.46 -2742.86 -90.00 0.00 -7.44
12250.80 90.00 184.10 8760.00 3628.28 -3038.48 5964506.73 672891.92 7.46 -2718.24 -90.00 0.00 -7.48
12275.80 90.00 182.24 8759.99 3603.32 -3039.86 5964481.75 672891.12 7.46 -2693.77 -90.00 0.00 -7.44
12300.00 90.00 180.43 8759.99 3579.13 -3040.42 5964457.55 672891.13 7.46 -2670.26 -90.00 0.00 -7.48
12300.80 90.00 180.37 8759.99 3578.33 -3040.43 5964456.75 672891.14 7.46 -2669.48 -90.00 0.00 -7.50
12325.80 90.00 178.51 8759.99 3553.33 -3040.19 5964431.76 672891.97 7.46 -2645.40 -90.00 0.00 -7.44
12350.80 90.00 176.64 8759.991 3528.36 -3039.13 5964406.82 672893.61 7.46 -2621.55 -90.00 0.00 -7.48
12375.80 90.00 174.78 8759.99 3503.43 -3037.26 5964381.94 672896.06 7.46 -2597.95 -90.00 0.00 -7.44
12400.00 90.00 172.98 8759.99 3479.37 -3034.68 5964357.95 672899.20 7.46 -2575.38 -90.00 0.00 -7.44
12400.80 90.00 172.92 8759.99 3478.57 -3034.58 5964357.16 672899.32 7.46 -2574.64 -90.00 0.00 -7.~0
12425.80 90.00 171.05 8759.99 3453.82 -3031.10 5964332.50 672903.38 7.46 -2551.63 -90.00 0.00 -7.48
12450.80 90.00 169.19 8759.99 3429.19 -3026.81 5964307.98 672908.25 7.46 -2528.95 -90.00 0.00 -7.44
12475.80 90.00 167.32 8759.99 3404.71 -3021.72 5964283.63 672913.91 7.46 -2506.62 -90.00 0.00 -7.48
D
Meas. Incl. TRUE Subsea Coords.- True Coords.- ASP Dogleg Vertical Tool Face Build Turn
Depth Angle Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments
(de~) (de~) (ft) Lat. (Y) Dei~. (X) Lat. (Y) Dep, (X) (°/100ft) Ilfi/ellheadl (°/100fi) (°/100fi)
12500.00 90.00 165.52 8759.99 3381.19 -3016.04 5964260.25 672920.14 7.46 -2485.37 -90.00 0.00 -7.44
12500.80 90.00 165.46 8759.99 3380.42 -3015.84 5964259.48 672920.36 7.46 -2484.68 -90.00 0.00 -7.50
12525.80 90.00 163.60 8759.99 3356.32 -3009.17 5964235.55 672927.59 7.46 -2463.13 -90.00 0.00 -7.44
12550.80 90.00 161.73 8759.99 3332.46 -3001.72 5964211.87 672935.59 7.46 -2442.01 -90.00 0.00 -7.48
12575.80 90.00 159.87 8759.99 3308.85 -2993.50 5964188.46 672944.36 7.46 -2421.33 -90.00 0.00 -7.44
12600.00 90.00 158.06 8759.99 3286.27 -2984.81 5964166.08 672953.58 7.46 -2401.76 -90.00 0.00 -7.48
12600.80 90.00 158.00 8759.99 3285.52 -2984.51 5964165.35 672953.89 7.46 -2401.12 -90.00 0.00 -7.50
12625.80 90.00 156.14 8759.99 3262.50 -2974.77 5964142.56 672964.17 7.46 -2381.41 -90.00 0.00 -7.44
12650.80 90.00 154.28 8759.99 3239.81 -2964.29 5964120.12 672975.18 7.46 -2362.20 -90.00 0.00 -7.44
12675.80 90.00 152.41 8759.99 3217.46 -2953.08 5964098.05 672986.91 7.46 -2343.52 -90.00 0.00 -7.48
12700.00 90.00 150.61 8759.99 3196.20 -2941.53 5964077.06 672998.95 7.46 -2325.961 -90.00 0.00 -7.44
12700.80 90.00 150.55 8759.99 3195.50 -2941.14 5964076.37 672999.36 7.46 -2325.39 -90.00 0.00 -7.50
12725.80 90.00 148.68 8759.99 3173.93 -2928.49 5964055.11 673012.50 7.46 -2307.83 -90.00 0.00 -7.48
12750.80 90.00 146.82 8759.99 3152.79 -2915.16 5964034.28 673026.33 7.46 -2290.86 -90.00 0.00! -7.44
12775.80 90.00 144.96 8759.99 3132.09 -2901.14 5964013.92 673040.83 7.46 -2274.50 -90.00 0.00 -7.44
12800.00 90.00 143.15 8759.99 3112.50 -2886.93 5963994.67 673055.49 7.46 -2259.25 -90.00 0.00 -7.48
12800.80 90.00 143.09 8759.99 3111.86 -2886.45 5963994.04 673055.99 7.46 -2258.76 -90.00 0.00 -7.50
12825.80 90.00 141.23 8759.99 3092.12 -2871.11 5963974.67 673071.78 7.46 -2243.66 -90.00 0.00 -7.44
12850.80 90.00 139.36 8759.99 3072.89 -2855.14 5963955.81 673088.19 7.46 -2229.22 -90.00 0.00 -7.48
12875.80 90.00 137.50 8759.99 3054.18 -2838.56 5963937.50 673105.21 7.46 -2215.44 -90.00 0.00 -7.44
12900.00 90.0-0 135.69 8759.99 3036.60 -2821.93 5963920,32 '673122.25 7.46 -2202.76 -90.00 0.00 -7.48
12900.80 90.00 135.63 8759.99 3036.03 -2821.37 5963919.76 673122.82 7.46 -2202.36 -90.00 0.00 -7.50
,~:~ .
12925.80 90.00 133.77 8759.99 3018.45 -2803.60 5963902.60 673140.99 7.46 -2189.97 -90.00 0.00 -7.44
12950.80 90.00 131.91 8759.99 3001.45 -2785.27 5963886.03 673159.72 7.46 -2178.30 -90.00 0.00 -7.44
12975.80 90.00 130.04 8760.00 2985.06 -2766.40 5963870.09 673178.97 7.46 -2167.35 -90.00 0.00 -7.48
13000.00 90.00 128.24 8760.00 2969.78 -2747.63 5963855.26 673198.09 7.46 -2157.45 -90.00 0.00 -7.44
13000.80 90.00 128.18 8760.00 2969.29 -2747.00 5963854.78 673198.73 7.46 -2157.14 -90.00 0.00 -7.50
13025.80 90.00 126.31 8760.00 2954.16 -2727.10 5963840.12 673218.98 7.46 -2147.67 -90.00 0.00 -7.48 ,~1~$~ ~il & ~ ~C}~
13050.80 90.00 124.45 8760.00 2939.68 -2706.72 5963826.13 673239.69 7.46 -2138.96 -90.00 0.00 -7.44
13075.80 90.00 122.59 8760.00 2925.88 -2685.87 5963812.81 673260.85 7.46 -2131.02 -90.00 0.00 -7.44
13100.00 90.00 120.78 8760.00 2913.17 -2665.28 5963800.59 673281.73 7.46 -2124.08 -90.00 0.00 -7.48
13100.80 90.00 120.72 8760.00 2912.76 -2664.59 5963800.20 673282.43 7.46 -2123.86 -90.00 0.00 -7.50
1,3125.80 90.00 118.86 8760.00 2900.34 -2642.90 5963788.29 673304.41 7.46 -2117.48 -90.00 0.00 -7.44
13150.80 90.00 116.99 8760.00 2888.63 -2620.81 5963777.10 673326.76 7.46 -2111.89 -90.00 0.00 -7.48
13175.80 90.00 115.13 8760.00 2877.65 -2598.35 5963766.65 673349.47 7.46 -2107.09 -90.00 0.00 -7.44
13200.00 90.00 113.33 8760.00 2867.72 -2576.29 5963757.24 673371.76 7.46 -2103.21 -90.00 0.00 -7.44
13200.80 90.00 113.27 8760.00 2867.40 -2575.55 5963756.94 673372.50 7.46 -2103.09 -90.00 0.00 -7.50
13225.80 90.00 111.40 8760.00 2857.90 -2552.43 5963747.98 673395.84 7.46 -2099.90 -90.00 0.00 -7.48
13250.80 90.00 109.54 8760.00 2849.16 -2529.01 5963739.79 673419.46 7.46 -2097.52 -90.00 0.00 -7.44
13275.80 90.00 107.67 8760.00 2841.18 -2505.32 5963732.38 673443.33 7.46 -2095.95 -90.00 0.00 -7.48
13281.37 90.00 107.26 8760.00 2839.51 -2500.00 5963730.83 673448.68 7.46 -2095.71 0.00 0.00 -7.36 TD
ALASKA INC.
SSSV
Tubing
Casing
Casing
Gas Lift MandrelNalve I
Gas Lift MandrelNalve 2
Gas Lift Mandrel/Dummy
Valve 3
PKR
9079' MIN ID = 3.812"
: (4-1/2" HES X Nip)
NIP
Liner
TTL
Perf
Peri
IBP
Perf
Perf
APl: 500292267100
SSSV Type:
Annular Fluid: 6.8 Diesel/8.5
Seawater
Reference Log:
Last Tag: 9877
Last Tag Date: 6/25/98
Depth Annotations
Depth Comment
Prudhoe Bay
Well Type: PROD
Orig Compltn: 514/96
Last W/O: 5/5/96
Ref Log Date: 111/60
TD: 11060 ftKB
Max Hole 94 deg @ 10722
Angle:
9079 9079' MIN ID = 3.812" (4-1/2" HES X Nip)
General Notes
Date Note
GLM'S HAVE LOWER PSI RATE THAN NORMAL CK W/ACE/FE
5/3/96 TTL ELM {~ 0: ELM Tubing Tail (Not Logged)
Other (plugs, equip., etc.) - JEWELRY
Depth TVD Type
2184 2138 SSSV
9056 8096 PKR
9079 8118 NIP
9091 8129 'rTL
Casing Strings - All
Size Weight
4.500 12.60
7.000 26.00
9.625 40.00
Tubing Strings - All
Size Weight Grade
4.500 12.60 L-80
Gas Lift Mandrals/Valves
Stn MD TVD Man Man
Mfr Type
1
2
3
Description
4-1/2" HES HXO SVLN SSSV Nipple
7" x 4-1/2" Baker S-3 Packer
4-1/2" HES X Nipple
4-1/2" Tubing Tail W/L Re-ent~j Guide
~'~'~'i · ~'~lm~'~ ,~ a ~;~1~1~,-/~' ,
Grade Top Btm Feet Description
L-80 9080 11060 1980 Liner
L-80 0 9258 9258 Casing
L-80 0 3829 3829 Casing
Top Btm Feet Description
0 9091 9091 Tubing
V Mfr V Type V OD Latch Port TRO
4001 3699 CAMCO ;BG2LSMOI CAMCO GLV 1.0
7098 6300 CAMCO :BG2LSMOI CAMCO OV 1.0
8987 8031 CAMCO;BG2LSMOI CAMCO DMY 1.0
1. BK - CAMCO vlv ran in this mandrel requires modified latch
2. DKO-2 - CAMCO vlv ran in this mandrel requires modified latch
15-45
Angle ~ TS: 20 deg ~ 9295
Angle {~ TD: 86 deg ~ 11060
Rev Reason: Picture
Last Update: 4126/99
ID
3.813
0.000
3.812
0.000
0.001
Date Vlv
Run Commenl
INT 0.250 2176 7123/97 (1)
INT 0.313 0 7/23197 (2)
INT 0.000 0 10/18/96 (3)
3. E- CAMCO vlv ran in this mandrel requires modified latch
Perforations Summary
Intewal TVD
9880 - 10080 8786- 8786
10110- 8786-8783
10510
10560- 8782-8776
10770-
10820- 8775-8775
10890
Zone StatusFeetSPF Date Type Comment
ZONE O 200 4 512/96 IPERF
lB
ZONE O 400 4 5/2/96 IPERF
lB
ZONE O 210 4 5/2/96 IPERF
lB
ZONE O 70 4 5/2/96 IPERF
lB
Drilling Wellhead Detail
Methanol Injection
Otis 7" WLA
Quick Connect"
~ CT Injector Head
~__~~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure
'~ I "- 7" Riser
I I
Annular BOP (Hydril),7-1/16" ID
5000 psi WP
Alignment Guide Flange
7-1/16", 5M Ram Type Dual
Gate BOPE
Flanged Fire Resistant
Kelly Hose to Dual HCR
Choke Manifold
Cutters or
Combination Cutter/Blinds
Slip/Pipe Rams
Manual Valves Drilling spool 7-1/16", 5M
by 7-1/16", 5M
Manual over Hydraulic
Ram Type Dual Gate BOPE
7-1/16" ID with
Pipe/Slip Rams
Manual Master Valve
O.458' (5.5")
2" Pump-In
Fire resistant Kelly Hose to
Flange by Hammer up 1/4 Turn
Valve on DS Hardline to Standpipe
manifold
Hanger
Upper Annulus
Lower Annulus
CASH ADVANCE DRAFT
101
82~/1021
PAY TO THE
ORDER OF
+~1 ~O ~ ~OO ~OO,: ~ 5 ,,,O ~ ? 5000 t ? ~,'O ~O ~
iiii ii i i i i i i i ill
DOLLARS
$1000
WELL PERMIT CHECKLIST COMPANY . ,-~.~.; ,/,/,~ WELL NAME/~,~"-/--~..~'~. PROGRAM: exp dev
FIELD & POOL (~2/'~/'~"~ INIT 61-~s''~,..-~~ ~- ~)///.--- ;3EOL AREA
ADMINISTRATION
~,P,P~_~ DATE
ENGINEERING
GEOLOGY
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
14. Conductor string provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to ~)...~:)r~ psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
30. Permit can be issued w/o hydrogen sulfide measures .....
v'" reddl J serv wellbore seg
UNIT#
ann. disposal para req
ON/OFF SHORE
Y
Y N-,,'
N
N
N
A,~ DATE
31. Data presented on potential overpressure zones ....... ,4/A
32. Seismic analysis of shallow gas zones ............ ,,V,~., Y N
33. Seabed condition survey (if off-shore) ............. ,,'t/,~/ Y N
34. Contact name/phone for weekly progress reports [exploratory o,~,~Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; ....... Y N
APPR DATE (B) will not con~minat~ter; or cause drilli~... Y N
to surface;/ / I / \
(C) will not ~ty~f~.e well usedfor d!sposal; Y N
(D) will not ion or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY..; ENGINEERING: UlC/Annular COMMISSION:
Comments/Instructions:
J§
I§ (
I'll
Z
-i
-1'
c:\msoffice\wordian\diana\checklist (rev. 02/17/00)
oo -
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Wed May 08 14:13:40 2002
Reel Header
Service name ............. LISTPE
Date ..................... 02/05/08
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Tape Header
Service name ............. LISTPE
Date ..................... 02/05/08
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
15-45A
500292267101
BP Exploration (Alaska), Inc.
Sperry Sun
06-MAY-02
lST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
1.
MWD RUN 1 MWD RUN 2 MWD RUN 3
AK-MW-00170 AK-MW-00170 AK-MW-00170
S. LATZ S. LATZ S. LATZ
WHITLOW/SEVC WHITLOW/SEVC WHITLOW/SEVC
22
liN
14E
530
5177
68.06
.00
32.70
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.500 3829.0
7.000 9258.0
4.500 10838.0
ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2.
MWD RUNS 1 - 3 ARE DIRECTIONAL WITH NATURAL GAMMA
PROBE (NGP)
UTILIZING A SCINTILLATION DETECTOR.
3. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 10817'
MD, 8751' SSTVD TO
10838' MD, 8707' SSTVD.
4. GAMMA RAY (SGRD) BETWEEN 10817' MD, 8751' SSTVD AND
11003' MD, 8697' SSTVD
WAS OBTAINED ON A MADPASS TO FILL IN DATA BETWEEN
THE WHIPSTOCK AND
THE OPEN HOLE SIDETRACK POINT.
5. THIS WELL WAS DRILLED BY TWO DRILLING RIGS. FIRST BY
NABORS 3S WHICH
DRILLED TWO PLUGBACKS. NORDIC 1 LATER PERFORMED AN
OPEN HOLE SIDETRACK
AT 11061' MD, 8695' SSTVD, THIS WAS BETWEEN THE
WHIPSTOCK AND A FISH LEFT
IN THE HOLE BY NABORS 3S ON PLUGBACK %2.
DIGITAL DATA ONLY IS DEPTH CORRECTED TO THE PDC LOG
OF 9/08/00
(MCNL GR) WITH A KBE OF 68.06' AMSL..
THIS WELL KICKS OFF FROM 15-45 AT 10838' MD, 8707'
SSTVD (NABORS 3S,
BOTTOM OF WHIPSTOCK).
THIS WELL KICKS OFF FROM 1545APB1 AT 11061' 8695'
SSTVD (NORDIC 1, O.H.S.T
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
7.
MWD RUNS 1 - 3 REPRESENT WELL 15-45A WITH API
50-029-22671-01.
THIS WELL REACHED A TOTAL DEPTH OF 12906' MD, 8770'
SSTVD.
SGRD = SMOOTHED GAMMA RAY
SROP = SMOOTHED RATE OF PENETRATION
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
%
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 10818.5 12873.5
ROP 11062.0 12904.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
10818.5
10821.5
10823.5
10826.0
10829.5
10834 5
10848 5
10861 0
10866 5
10872 0
10888 0
10890 5
10896 5
GR
10817.5
10820.5
10823.5
10826.5
10829.5
10835.5
10849.5
10861.5
10866.5
10873.0
10889.0
10890.5
10898.0
EQUIVALENT UNSHIFTED DEPTH
10900.5
10907.5
10915.0
10921.0
10940.5
10950 0
10962 5
10981 0
11004 5
11022 0
11028 5
11039.5
11052.5
11056.0
11075.0
11089.0
11101.0
11107.0
11118.5
11132.5
11143.0
11149.0
11156.0
11166.0
11180.0
11197.0
11205.5
11207.5
11213.0
11227 0
11240 0
11242 0
11249 0
11254 0
11265 0
11269 5
11271 5
11277 0
11282 0
11290.0
11294.5
11306.5
11312.0
11313 5
11316 0
11320 5
11334 0
11339 5
11373 5
11375 5
11380 0
11386 0
11411 5
11414.0
11418.5
11442.5
11459.5
11479.5
11488.5
11517.5
11532.0
11555.5
11572 0
11603 0
11627 0
11642 5
11655 5
11675 0
11739 5
11745 5
11752 0
11767 5
11789 5
11800 0
11810 5
11818 0
10902.5
10909.5
10917.5
10923.5
10942.5
10951.5
10965.5
10985.5
11007.5
11023.0
11029.5
11039.0
11049.5
11053.5
11076.5
11092.5
11102.0
11107.5
11121 0
11135 0
11145 5
11150 0
11158 5
11169 0
11184 5
11201 5
11209 0
11212 0
11218 0
11235.0
11247.0
11249.5
11256.0
11260.0
11269.0
11274.5
11277.0
11281.0
11285.5
11293.5
11298.5
11311.0
11316.5
11319.5
11322 0
11326 0
11339 0
11343 5
11378 0
11380 0
11383 5
11389 0
11414 0
11416 0
11419 0
11438 0
11459 0
11477 5
11486.0
11515.5
11531.0
11554.5
11569.5
11602.5
11625.5
11647.0
11656.5
11676.5
11743.0
11749.5
11754 0
11769 0
11788 5
11801 5
11815 0
11822 0
11824.5
11833.0
11836.5
11852 5
11858 0
11871 5
11881 0
11891 0
11902 0
11914 0
11930 5
11934 5
11948 0
11954 0
11956.0
11964.5
11989.0
11995.0
11998.0
12040.5
12082.0
12091.0
12143.0
12147.5
12207.5
12223.0
12224.5
12237 5
12256 5
12273 5
12354 0
12413 0
12434 0
12435 5
12444 5
12484 5
12497 5
12553 0
12558 0
12580.5
12584.0
12591.0
12602.0
12616.0
12624.0
12629 0
12644 5
12660 0
12700 0
12706 0
12715 5
12727.0
12733.0
12744.0
12758.0
12769.0
12819.0
12825.0
12904.5
$
11827.5
11835.0
11838.0
11852.5
11857.5
11872.0
11880.5
11890.5
11902.5
11913.5
11929.0
11934.0
11947.5
11953.0
11956.0
11964.5
11990 0
11996 0
11999 5
12041 5
12083 0
12092 0
12145 0
12148 5
12209.0
12223.0
12225.5
12241.5
12258.5
12277 5
12354 0
12414 5
12431 0
12434 0
12443 5
12480 5
12495 5
12552.0
12557.5
12578.5
12583.0
12590.0
12599.5
12613.5
12622 0
12629 0
12645 5
12661 5
12699 0
12706 5
12713 5
12726.0
12733.5
12744.5
12759.0
12770.5
12821.0
12826.5
12906.0
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
BIT RUN NO MERGE TOP MERGE BASE
1 10817.5 11350.0
2 11350.5 11630.0
3 11630.5 12906.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10818.5 12904.5 11861.5 4173
ROP MWD FT/H 0.95 1019.22 103.966 3686
GR MWD API 27.63 506.77 69.4119 4111
First Reading For Entire File .......... 10818.5
Last Reading For Entire File ........... 12904.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
First
Reading
10818.5
11062
10818.5
Last
Reading
12904.5
12904.5
12873.5
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10817.5 11319.0
ROP 11061.0 11350.0
$
LOG HEADER DATA
DATE LOGGED: 04-SEP-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.2
DOWNHOLE SOFTWARE VERSION: 3.30
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 11350.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 86.0
MAXIMUM ANGLE: 91.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE 033
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
3.750
BOREHOLE CONDITIONS
MUD TYPE: Flo Pro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 65.0
MUD PH: 9.3
MUD CHLORIDES (PPM): 24500
FLUID LOSS (C3): 6.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MUD AT MAX CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: .000
MUD CAKE AT MT: o000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
.0
146.0
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10817.5 11350 11083.8 1066
ROP MWD010 FT/H 0.95 259.34 95.0377 579
GR MWD010 API 27.63 506.77 73.7399 1004
First Reading For Entire File .......... 10817.5
Last Reading For Entire File ........... 11350
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
First
Reading
10817.5
11061
10817.5
Last
Reading
11350
11350
11319
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11319.5 11599.0
ROP 11350.5 11630.0
$
LOG HEADER DATA
DATE LOGGED: 04-SEP-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.2
DOWNHOLE SOFTWARE VERSION: 3.30
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 11630.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 82.7
MAXIMUM ANGLE: 91.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE 002
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE: Flo Pro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY S): 65.0
MUD PH: 9.0
MUD CHLORIDES PPM): 24500
FLUID LOSS (C3 : 6.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000 .0
MUD AT MAX CIRCULATING TERMPERATURE: .000 154.0
MUD FILTRATE AT MT: .000 .0
MUD CAKE AT MT: .000 .0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 11319.5 11630 11474.8 622
ROP MWD020 FT/H 22.5 649.82 80.3805 560
GR MWD020 API 29.8 160.17 98.0178 560
First Reading For Entire File .......... 11319.5
Last Reading For Entire File ........... 11630
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
First
Reading
11319.5
11350.5
11319.5
Last
Reading
11630
11630
11599
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11599.5 12875.0
ROP 11630.5 12906.0
$
LOG HEADER DATA
DATE LOGGED: 06-SEP-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.2
DOWNHOLE SOFTWARE VERSION: 3.30
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 12906.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 80.2
MAXIMUM ANGLE: 92.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE 033
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
3.750
BOREHOLE CONDITIONS
MUD TYPE: Flo Pro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 65.0
MUD PH: 8.5
MUD CHLORIDES (PPM): 24000
FLUID LOSS (C3): 6.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MUD AT MAX CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: .000
MUD CAKE AT MT: .000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
.0
159.0
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 11599.5 12906 12252.8 2614
ROP MWD030 FT/H 10.3 1019.22 111.048 2552
GR MWD030 API 28.87 185.57 61.6757 2552
First Reading For Entire File .......... 11599.5
Last Reading For Entire File ........... 12906
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 02/05/08
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
First
Reading
11599.5
11630.5
11599.5
Last
Reading
12906
12906
12875
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 02/05/08
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 02/05/08
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
**** REEL HEADER ****
MWD
02/06/05
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/06/05
48635
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
Remark File Version 1.000
Extract File: ldwg.las
~Version Information
VERS. 1.20:
WRAP. NO:
~Well Information Block
#MNEM.UNIT Data Type
STRT FT 10743.0000:
STOP FT 12000.0000:
STEP FT 0.5000:
NULL -999.2500:
COMP COMPANY:
WELL WELL:
FLD FIELD:
LOC LOCATION:
CNTY COUNTY:
STAT STATE:
SRVC SERVICE COMPANY:
TOOL TOOL NAME & TYPE:
DATE LOG DATE:
API API NUMBER:
-Parameter Information Block
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration (Alaska), Inc.
15-45APB1
Prudhoe Bay Unit
590' FNL, 5177' FEL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Ga/mna Ray
15-Jun-2000
500292267171
#MNEM.UNIT Value Description
SECT. 22 : Section
TOWN.N llN : Township
RANG. 14E : Range
PDAT. MSL : Permanent Datum
EPD .F 0 : Elevation Of Perm. Datum
LMF . RKB : Log Measured from
FAPD.F 68.06 : Feet Above Perm. Datum
DMF . KB : Drilling Measured From
EKB .F 68.06 : Elevation of Kelly Bushing
EDF .F N/A : Elevation of Derrick Floor
EGL .F N/A : Elevation of Ground Level
CASE.F N/A : Casing Depth
OS1 . DIRECTIONAL : Other Services Line 1
~Remarks
(1) Ail depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Well 15-45APB1 was kicked off @ 10831' MD (8706' SSTVD) from the
wellbore of 15-45.
(5) Well 15-45APB1 was drilled to 12000' MD (8853' SSTVD) on Run 5.
(6) . The interval from 11976' MD (8831' SSTVD) to 12000' MD (8853' SSTVD)
was not logged due to sensor to bit offset.
(7) The data presented here is final and it has been depth shifted
to the PDC (Primary Depth Control) supplied by BPX (SWS, 8-Sept-2000).
(8)
A Magnetic Declination correction of 26.93 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX
ROPS
TVD
-> Gamma Ray MWD-API [MWD] (MWD-API units)
-> Rate of Penetration, (feet/hour)
-> Subsea True Vertical Depth, (SSTVD), (feet)
SENSOR OFFSETS:
RUN GAMMA DIRECTIONAL
1 24.83 ft. 29.82 ft.
2 24.05 ft. 29.04 ft.
3 24.29 ft. 29.28 ft.
4 24.29 ft. 29.28 ft.
5 24.09 ft. 29.08 ft.
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
10806.0, 10804.1, ! -1.81738
10828.4, 10829.4, ! 1.01074
10860.4, 10861.0, ! 0.606445
10865.7, 10866.7, ! 1.00977
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
78 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration (Alaska), Inc.
WN 15-45APB1
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 08-Sep-00
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
GR GR GRAX14 0.0
ROP ROP ROPS14 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 API
2 ROP MWD 68 1 F/HR
Size
4
4
Total Data Records: 30
Tape File Start Depth = 10743.000000
Tape File End Depth = 12000.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
FILE TRAILER ****
Tape Subfile: 2
39 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
Length
4
4
8
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration (Alaska),
WN 15-45APB1
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COM~4ENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
GRAX GRAX
ROPS ROPS
GRAX
ROPS
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: IF ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRAX MWD 68 1 API
2 ROPS MWD 68 1 F/HR
0.0
0.0
Size
4
4
Total Data Records: 30
Tape File Start Depth = 10743.000000
Tape File End Depth = 12000.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
39 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/06/05
48635
01
Length
4
4
8
**** REEL TRAILER ****
MWD
02/06/05
BHI
01
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR
10743.0000 25.4600
10743.5000 25.4600
10800.0000 54.1742
10900.0000 65.6800
11000.0000 51.9800
11100.0000 41.7700
11200.0000 22.0200
11300.0000 60.9300
11400.0000 106.0900
11500.0000 79.0700
11600.0000 69.6600
11700.0000 26.0700
11800.0000 91.4700
11900.0000 65.2800
12000.0000 -999.2500
ROP
-999.2500
-999.2500
58.7437
54.2800
68.4600
102.9400
128 0200
38 0400
59 3100
25 3200
68 4500
126 0000
27 7900
86 3200
22 5200
Tape File Start Depth = 10743.000000
Tape File End Depth = 12000.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX
10743.0000 -999.2500
10743.5000 -999.2500
10800.0000 53.0200
10900.0000 64.3100
11000.0000 54.5000
11100.0000 41.3000
11200.0000 24.6300
11300.0000 41.5400
11400.0000 104.6700
11500.0000 90.5200
11600.0000 65.2400
11700.0000 23.9600
11800.0000 92.0500
11900.0000 60.4800
12000.0000 -999.2500
ROPS
-999.2500
-999.2500
57.3800
60.4100
64.3900
103.2300
120.0600
107 6800
68 8000
16 8500
44 5600
126 0000
42 4900
78.6200
22.7500
Tape File Start Depth = 10743.000000
Tape File End Depth = 12000.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
**** REEL HEADER ****
MWD
02/06/05
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/06/05
48635
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
Remark File Version 1.000
Extract File: ldwg.las
~Version Information
VERS. 1.20:
WRAP. NO:
~Well Information Block
CWLS log ASCII Standard -VERSION 1.20
One line per frame
#MAIEM.UNIT Data Type Information
STRT.FT 10798.0000: Starting Depth
STOP.FT 12906.0000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: 15-45APB2
FLD . FIELD: Prudhoe Bay Unit
LOC . LOCATION: 590' FNL, 5177' FEL
CNTY. COUNTY: North Slope
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 1.75" NaviGamma - Gamma Ray
DATE. LOG DATE: 24-Jun-2000
API . API NYUMBER: 500292267172
-Parameter Information Block
#MAIEM.UNIT Value Description
SECT. 22 : Section
TOWN.N llN : Township
RANG. 14E : Range
PDAT. MSL : Permanent Datum
EPD .F 0 : Elevation Of Perm. Datum
LMF . RKB : Log Measured from
FAPD.F 68.06 : Feet Above Perm. Datum
DMF . KB : Drilling Measured From
EKB .F 68.06 : Elevation of Kelly Bushing
EDF .F N/A : Elevation of Derrick Floor
EGL .F N/A : Elevation of Ground Level
CASE.F N/A : Casing Depth
OS1 . DIRECTIONAL : Other Services Line 1
~Remarks
(1) Ail depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Well 15-45APB2 was kicked off @ 11193' MD (8689' SSTVD) from the
wellbore of 15-45APB1.
(5) Well 15-45APB2 was drilled to 12906' MD (8776' SSTVD) on Run 12.
(6) The interval from 12888' MD (8776' SSTVD) to 12906' MD (8776' SSTVD)
was not logged due to sensor to bit offset.
(7) The data presented here is final and it has been depth shifted
to the PDC (Primary Depth Control) supplied by BPX (SWS, 8-Sept-2000).
(8)
Well 15-45APB2 MWD data was tie into well 15-45APB1 ~ 11193 ' MD
(8689' SSTVD).
A Magnetic Declination correction of 26.93 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX
ROPS
TVD
-> Gamma Ray MWD-API [MWD] (MWD-API units)
-> Rate of Penetration, (feet/hour)
-> Subsea True Vertical Depth, (SSTVD), (feet)
SENSOR OFFSETS:
RUN GAMMA DIRECTIONAL
6 24.14 ft
7 24.09 ft
9 24.26 ft
10 24.29 ft
11 24.09 ft
12 24.09 ft
29.13 ft.
29.08 ft.
29.25 ft.
29.28 ft.
29.08 ft.
29.08 ft.
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
10806.0, 10804.1, ! -1.81738
10828.4, 10829.4, ! 1.01074
10860.4, 10861.0, ! 0.606445
10865.7, 10866.7, ! 1.00977
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
81 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration (Alaska), Inc.
WN 15-45APB2
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gan~na Ray dated 08-Sep-00
*** INFORMATION TABLE: CIFO
MN-EM CHAN DIMT CNAM ODEP
GR GR
ROP ROP
GRAXl0
ROPS10
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 API
2 ROP MWD 68 1 F/HR
0.0
0.0
Size
4
4
Total Data Records: 51
Tape File Start Depth = 10798.000000
Tape File End Depth = 12902.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
60 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
Length
4
4
8
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration (Alaska),
WN 15-45APB2
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMI~ENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MAIEM CHAN D IMT CNAM
ODEP
GRAX GRAX GRAX 0.0
ROPS ROPS ROPS 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRAX MWD 68 1 API
2 ROPS MWD 68 1 F/HR
Size
4
4
Total Data Records: 51
Tape File Start Depth = 10798.000000
Tape File End Depth = 12902.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
60 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/06/05
48635
01
Length
4
4
8
**** REEL TRAILER ****
MWD
02/06/05
BHI
01
Tape Subfile: 4
Minimum record length:
2 records...
132 bytes
Tape Subfile 2 is type: LIS
DEPTH
10798 0000
10798 5000
10800 0000
10900 0000
11000 0000
11100 0000
11200.0000
11300.0000
11400.0000
11500.0000
11600.0000
11700.0000
11800.0000
11900.0000
12000.0000
12100.0000
12200 0000
12300 0000
12400 0000
12500 0000
12600 0000
12700 0000
12800.0000
12900.0000
12902.0000
GR
-999.2500
53.2657
54.1742
65.6800
51.9800
41.7700
30.2070
54.3960
70.4580
86.4550
96.8730
95.1980
195.9010
22.8130
45.9950
63.9190
40.9720
42.5170
87.5600
70.1420
66.8580
27.9320
30.9270
-999.2500
-999.2500
Tape File Start Depth =
Tape File End Depth =
Tape File Level Spacing =
Tape File Depth Units =
ROP
-999.2500
58.1253
58.7437
54.2800
68.4600
102.9400
64.2920
54.2430
61.5230
42.3270
43.5430
41.6630
27.7190
115.1830
90.8960
54.3150
55.7890
36.6130
60.0000
71.1210
55.1180
61.3750
50.1970
39.8000
5.1240
10798.000000
12902.000000
0.500000
feet
Tape Subfile 3 is type: LIS
DEPTH
10798.
10798.
10800.
10900.
11000.
11100.
11200
11300
11400
11500
11600
11700
11800
11900
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
12902
GRAX
0000 -999
5000 -999
0000 -999
0000 63
0000 55
0000 41
0000 29
0000 50
0000 69
0000 94
0000 93
0000 96
0000 195
0000 22
0000 47
0000 64
0000 48
0000 38
0000 84
0000 60
0000 74
0000 28
0000 29
0000 -999
0000 -999
.2500
.2500
.2500
9650
2160
1860
0450
0970
9550
5040
1640
6070
9010
8130
1540
0700
7230
6230
8240
6730
3920
0290
9140
2500
2500
ROPS
-999 2500
-999 2500
-999 2500
60 4110
64 3870
103 2280
64.3090
82.3600
50.7180
43.8310
43.5490
15.1530
28.2600
23.2040
89.2580
42.9150
54.1340
57.6270
59.2350
71.2880
50.2000
57.3450
46.3520
23.5120
-999.2500
Tape File Start Depth = 10798.000000
Tape File End Depth = 12902.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS