Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
200-089
1. Operations Abandon Performed: Suspend ❑ Plug for Redrill ❑ 2. Operator Name: Hilcorp Alaska, LLC 3. Address: 3800 Centerpomt Drive Anchorage, AK 99503 7. Property Designation (Lease Number) NDL0018756/ ADL0018754 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Plug Perforations LJ Fracture Stimulate Pull Tubing Perforate [] Other Stimulate[] Alter Casing ❑ Perforate New Pool ❑ Repair Well❑ Re-enter Susp Well ❑ 4. Well Class Before Work: 5. Per Development ❑✓ Exploratory El0_0 Suite 1400 Stratigraphic ❑ Service ❑ 6. API Logs (List logs and submit electronic and printed data per :al Depth measured 10,750 feet true vertical 9,657 feet ;cove Depth measured 10,684 feet true vertical 9,613 feet king Length Size measured Structural feet Conductor 300' 24„ true vertical Surface 1,644' 13-3/8" MD Surface 5,657' 9-5/8" Intermediate 3,930' 7„ 300' Liner 1,833' 5" oration depth Measured depth 9,347 - 10,520 feet True Vertical depth 8,685 - 9,501 feet 19 (size, grade, measured and true vertical depth) ers and SSSV (type, measured and true vertical depth) 5,306' timulation or cement squeeze summary: 6,330 psi ,als treated (measured): 8,620' ment descriptions including volumes used and final pressure: Pdor to well operation: 74 Subsequent to operation: 40 14. Attachments inquired per20 AAC 25.070, 25.071, & 25.283) Daily Report of Well Operations ❑✓ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 17. I hereby certify that the foregoing is true and cc Stan W. Golis 6::) 7? Operations shutdown ❑ Change Approved Program ❑ Other: n 0084-03-00 A34-11RD3 eld/Pool(s): Ground Shoal / Middle Ground Shoal Oil Pool 2-7/8" 6.5# / L-80 8,786 (MD) 8,752 (MD) Baker DB Perm PKR 8,232 (TVD) Baker TE5-SSSV Collapse 1,130 psi 3,810 psi 5,410 psi 10,500 psi 8,261 (TVD) 247 (MD) 247 (TVD) rrocucoon or Injection Data 'as-Mcf Water -Bbl Casing Pressure Tubing Pressure 49 468 1156 18 46 267 1118 274 I Class after work. rloratory ❑ Development 0 Service ❑ ❑ Stratigraphic I Status after work: Oil Q Gas ❑ WDSPL [ ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG L my knowledge. iSundry Nnmhar , nue ,. n r, Contact Name: Dan Marlowe Contact Email: dmarlowe@hilcoro com Date: e) S O Contact Phone: (907) 283-1329 Form 10-404 Revised 4/2017 / r / II �. �/ RBDMS,�4g 0 5 2019 Submit Original Only Plugs measured N/A feet Junk measured 10,684 feet Packer measured 8,752 feet true vertical 8,232 feet MD TVD Burst 300' 300' 1,644' 1,641' 2,730 psi 5,657' 5,306' 6,330 psi 9,255' 8,620' 7,240 psi 10,740' 9,651' 9,910 psi 2-7/8" 6.5# / L-80 8,786 (MD) 8,752 (MD) Baker DB Perm PKR 8,232 (TVD) Baker TE5-SSSV Collapse 1,130 psi 3,810 psi 5,410 psi 10,500 psi 8,261 (TVD) 247 (MD) 247 (TVD) rrocucoon or Injection Data 'as-Mcf Water -Bbl Casing Pressure Tubing Pressure 49 468 1156 18 46 267 1118 274 I Class after work. rloratory ❑ Development 0 Service ❑ ❑ Stratigraphic I Status after work: Oil Q Gas ❑ WDSPL [ ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG L my knowledge. iSundry Nnmhar , nue ,. n r, Contact Name: Dan Marlowe Contact Email: dmarlowe@hilcoro com Date: e) S O Contact Phone: (907) 283-1329 Form 10-404 Revised 4/2017 / r / II �. �/ RBDMS,�4g 0 5 2019 Submit Original Only nSCHEMATIC Hilcoru Alaska, LLC KB: 39, RKB to MSL = 73', RKB to mudiine 185 PBTE) 10,698` TD: 10,750' Middle Ground Shoal Well: A34-11RD3 Last Completed: 12-02-2000 PTD: 200-089 API: 50-733-10084-03 CASING DETAIL Size Wt Grade Conn ID Top Btm 24" 38.50' Conductor Top (TVD) Surf 300' 13-3/8" 54.5 1-55 BTC " Surf 1,644' 9-5/8„ 43.5 (15 its) 47 N-80 N-80 8 mc! BTC " " t4.276-' Surf 5,657' (TOW) 7" 26 L-80 BTC Mod " 5,325' 9,255' 5" 18 L-80 STL 8,907' 10,740' TUBING DETAIL 2-7/8" 6.5 L-80 1 8 rd AB Mod 1 2.441" Surf 8,786' JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item 1 38.50' 38.50' 2.323" Top (TVD) Tubing Hanger- Cameron 2 247' 247' 2.313" 4.620" Baker TES SSSV(16 each SS Bands) 9,390' 1,873' 1,870' 2.441" 4.750" GLM 1-CAMCO SFO -1 Open 3,405' 3,295' 2.441" 4.750" GLM 2-CAMCO SFO -1 6 4,627'4,405' 11/25/2000 2.441" 4.750" GLM 3-CAMCO SFO -1 9,696' 5,644' 5,295' 2.441" 4.750' GLM4-CAMCOSFO-1 3 6,353' ,6 .444 4.750" GLM 5-CAMCO SFO -15,9' 6 134' 11/26/2000 Open 4.750" GLM 6-CAMCO SFO -16,937' 9,900' 7,393' 6,949' 2.441" 4.750" 1 GLM 7-CAMCO SFO -1 Open H2 7,385' 21 4.750"MC7,851' 0 SFO -1 6 8,278' 7,793' 2441" 4.750" MCO SFO -1 10,422' 8,674' 8,164' 2.441" 4.750" GLM10-CAMCOSFO-1 4 8,716' 8,201' 2.313" 3.668" OTISX Nipple 6 8,750 8,230' 2.406: 3.500" GBH -22 Locator & 11' of 3.234" seals & mule shoe 5 8,752' 8,232' 3.250" 5.687" Baker 84-32 DB Perm Packer w/ 6' mill -out extension 6 8,778' 8,254' 2.205" 3.668" OTIS XN Nipple 7 8,786' 8,261' 2.441" 3.580" W LREG w/ 2000 psi shear pump out plug Wireline Information: Date Depth (MD) PERFORATION DETAIL 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261'cut to 10,267'fell to 10,684' Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD) SPF FT Date Status H1 9,347' 9,390' 8,685' 8,715' 6 43' 11/25/2000 Open H1 9,465' 91508' 8,766' 8,795' 6 43' 11/25/2000 Open K2 9,644' 9,644' 9,696' 8,890 8,926 6 52' 08/06/2019 Open H2 9,706' 9,840' 8,933' 9,026' 6 134' 11/26/2000 Open H2 9,860' 9,900' 9,040' 9,068' 6 40' 11/26/2000 Open H2 9,950' 1 10,180' 1 91103' 1 9,264' 6 230' 1 11/26/2000 Open H2 10,253' 10,422' 9,315' 9,433' 6 169' 11/26/2000 Open H2 10,455' 10,520' 9,456' 9,501' 6 65' 1 11/26/2000 Open Wireline Information: Date Depth (MD) Description 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261'cut to 10,267'fell to 10,684' Updated By: ILL 08/08/19 HHilcorp Alaska, LLC Hilcorp Alxssku, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MGS A34-11RD3 Eline 50-733-10084-03-00 200-089 8/6/2019 8/6/2019 Daily Operations: 08/06/2019 -Tuesday P1SM, R/U on A34-11RD3 with 2.10" gauge ring and CCL. Pressure test lubricator and associated equipment to 250psi low / 3000psi high per AOGCC regulations. RIH with 2.10" gauge ring and CCL. Got to 8968Ft and could not get through the liner top, tried 1OX at varying speeds. POOH. M/U and RIH with 1.25" LIB, 2.0" centralizer, CCL and Gamma tool. Broke through bridge at 9782', then stacked out at 9853' and could not work our way down. POOH. M/U & RIH w/ Gamma ray, CCL, and 18ft of 1.75" retrievable Geo Razor perf guns. 6 5PF, 60 deg phasing, 5.1g. Correlated logs with town and shifted up 5ft. Perforated 9696-9678ft (18FT), POOH. All shots fired. M/U & RIH w/ Gamma ray, CCL, and 18ft of 1.75" retrievable Geo Razor perf guns. 6 SPF, 60 deg phasing; 5.1g . Perforated 9678-9660ft (18FT), POOH. All shots fired. M/U & RIH w/ Gamma ray, CCL, and 16ft of 1.75" retrievable Geo Razor pert guns. 6 SPF, 60 deg phasing, 5.1g. Perforated 9660-9644ft (16FT), POOH. All shots fired. L/D spent guns and lubricator, nightcap and secure well for the night. SDFN. THE STATE OIALASKA GOVERNOR MIKE DUNLEAVY Stan Golis Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. a o g c c. o l a s k a. g o v Re: Middle Ground Shoal Field, Middle Ground Shoal Oil Pool, MGS A34-11RD3 Permit to Drill Number: 200-089 Sundry Number: 319-206 Dear Mr. Golis: Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this ZS day of April, 2019. RBDMS 2A�IAPR 16 2019 t STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AA(' 25 290 APR 2 2 2019 AOGCC 1. Type of Request: Abandon ❑ Plug Perforations J,//� Y 'l�� 1 j\' [� ®D I I ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ 1—e Perforate 0 • Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory ❑ Development 0 • Stratigraphic ❑ Service ❑ 200-089 ' 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-10084-03-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? CO 44A Will planned perforations require a spacing exception? Yes ❑ No ❑✓ MGS A34-11 RD3 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL0018756/ADL0018754 Middle Ground Shoal / F,Ftee^;,-Middle Gmd Shoal Oil Pool 11, PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 10,750 9,657 10,684 9,613 2,692 psi NIA 10,684 Casing Length Size MD TVD Burst Collapse Structural Conductor 300' 24' 300' 300' Surface 1,644' 13-3/8" 1,644' 1,641' 2,730 psi 1,130 psi Surface 5,657' 9-5/8" 5,657' 5,306' 6,330 psi 3,810 psi Intermediate 3,930' 7" 9,255' 8,620' 7,240 psi 5,410 psi Liner 1,833' 5" 10,740' 9,651' 9,910 psi 10,500 psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9,347 - 10,520 8,685 - 9,501 2-7/8" 6.5# / L-80 8,786 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): Baker DB Perm Packer & Baker TE5 SSSV 8,752 (MD) 8,232 (TVD) & 247 (MD) 247 (TVD) 12. Attachments: Proposal Summary Q Wellbore schematic 13. Well Class after proposed work: , Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Strati ra hic g p ❑ Development ❑� Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 511012019 OIL ❑✓ WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W. Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dmarlowe hilCOr .Com Contact Phone: (907) 283-1329 � Authorized Signature: Date: 2Z io r 9 COMMIS ONUSE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 510(-20U t I0( — L ^ ^U U Plug Integrity F1 BOP Test ❑ Mechanical Integrity Test ElE3i✓1 Location Clearance Other: RBmlL4 1 APR 2 6 2019 Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No Subsequent Form Required: > (�� Y C y n APPROVED BY1-f2 � Approved by: COMMISSIONER THE COMMISSION Date: S•l I r'�-Porto 03 Revised 4/20 Approved application is r p�r 2� h66 Illfb@@ Bt 16 [e of approval. Submit Form and ,A0r Duplicate r" _110)_ 9 _110)_ 9/,L3 /5 ff Hilrarp Alaska, LLC Well Prognosis Well Name: MGS A34-11rd3 API Number: 50-733-10084-03 Current Status: Gas -Lifted producer Leg: Leg #1 Estimated Start Date: May 10, 2019 Rig: N/A (E -Line) Reg. Approval Req'd? 403 Date Reg. Approval Rec'vd: Regulatory Contact: I Juanita Lovett (8332) 1 Permit to Drill Number: 200-089 First Call Engineer: Dan Marlowe (907) 283-1329 (0) (907) 398-9904 (M) Second Call Engineer: I Stan Golis (907) 777-8356 (0) (281) 450-3071 (M) Current Bottom Hole Pressure: 3,561 psi @ 8,685' TVD 0.410 psi/ft (7.88 ppg) Maximum Expected BHP: 3,561 psi @ 8,685' TVD 0.410 psi/ft (7.88 ppg) Maximum Potential Surface Pressure: 2,692 psi Using 0.1 psi/ft gradient 20 AAC 25.280(b)(4) Brief Well Summary Well Middle Ground Shoal A34-11rd3 is a gas -lifted oil well completed in the Hemlock sands. This project willre perf portions of the Hemlock bench 2 sands. E -line Procedure: 1. MIRU E -line, PT lubricator to 3,000 psi Hi 250 Low. 2. RU a -line guns and perforate per program. Record tubing pressures before and after perforating run. 3. RD E -line. 4. Turn well over to production. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic K tura Alaska. LLC KB: 38', RKB to MSL= 73, RKB to mudline 189' PBTD: 10,698' TD: 10,750' SCHEMATIC CASING DETAIL Middle Ground Shoal Well: A34-11RD3 Last Completed: 12-02-2000 PTD: 200-089 API: 50-733-10084-03 Size Wt Grade Conn ID Top Btm 24" 38.50' Conductor Top (TVD) Surf 300' 13-3/8" 54.5 J-55 BTC 12.615" Surf 1,644' 9-5/8" 43.5(15 its) 47 N-80 Brod N-80 BTC 8.755" 8.681" Surf 5,657'(TOW) 7" 26 L-80 BTC Mod 6.276" 5,325' 9,255' 5" 18 L-80 STL 4.276" 8,907' 10,740' TUBING DETAIL 2-7/8" 6.5 L-80 1 8 rd AB Mod 1 2.441" Surf 8,786' JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item 1 38.50' 38.50' 2.323" Top (TVD) Tubing Hanger -Cameron 2 247' 247' 2.313" 4.620" Baker TES SSSV (16 each SS Bands) 9,390' 1,873' 1,870' 2.441" 4.750" GLM 1—CAMCO SFO -1 Open 3,405' 3,295' 2.441" 4.750" GLM 2—CAMCO SFO -1 6 4,627' 4,405' 2.441" 4.750" GLM 3—CAMCO SFO -1 9,696' 5,644' 5,295' 2.441" 4.750" GLM 4—CAMCO SFO -1 3 61353' 1 51959' 2.441" 1 4.750" 1 GLM 5—CAMCO SFO -1 6 6,937' 6,516' 2.441" 4.750" GLM 6—CAMCO SFO -1 9,900' 7,393' 6,949' 2.441" 4.750" GLM 7—CAMCO SFO -1 Open 7,851' 7,385' 2.441" 4.750" GLM 8—CAMCO SFO -1 1 5 1 8,278' 7,793' 2.441" 4.750" GLM 9—CAMCO SFO -1 10,180' 8,674' 8,164' 2.441" 4.750" GLM 10—CAMCO SFO -1 4 8,716' 8,201' 2.313" 3.668" OTIS X Nipple 6 8,750' 8,230' 2.406: 3.500" GBH -22 Locator & 11' of 3.234" seals & mule shoe 5 8,752' 8,232' 3.250" 5.687" Baker 84-32 DB Perm Packer w/ 6' mill -out extension 6 8,778' 8,254' 2.205" 3.668" OTIS XN Nipple 7 8,786' 8,261' 2.441" 3.580" WLREG w/ 2000 psi shear pump out plug Wireline Information: Date Depth (MD) PERFORATION DETAIL 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261'cutto 10,267'fellto 10,684' Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD) SPF FT Date Status H1 9,347' , 9,390' 8,685' 8,715' 6 43' 11/25/2000 Open HS 9,465' 9,508' 8,766' 8,795' 6 43' 11/25/2000 Open HK2 9,644' 9,696' 8,890 8,926 5 52' 02/26/2019 Open H2 9,706' 9,840' 8,933' 9,026' 6 134' 11/26/2000 Open H2 9,860' 9,900' 9,040' 9,068' 6 40' 11/26/2000 Open HK2 1 9,912' 9,950' 1 9,076 1 9,103 1 5 1 38' 1 02/26/2019 Open H2 9,950' 10,180' 9,103' 9,264' 6 230' 11/26/2000 Open H2 10,253' 10,422' 9,315' 9,433' 6 169' 11/26/2000 Open H2 10,455' 10,520' 9,456' 9,501' 6 65' 11/26/2000 Open Wireline Information: Date Depth (MD) Description 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261'cutto 10,267'fellto 10,684' Updated By: JLL 03/11/19 Middle Ground Shoal Well: Completed: Last 12-02-2000 PROPOSED PTD: 00 08t9ed: HilcorP Almllut, LLC API: 50-733-10084-03 KB: 38', RKB to MSL= 73, RKB to m chine 184' CASING DETAIL PBTD: 10,698' TD: 10,750 Size Wt Grade Conn ID Top Btm 24" 38.50' Conductor (TVD) Surf 300' 13-3/8" 54.5 J-55 BTC 12.615" Surf 1,644' 1,870' 43.5(15 jts) N-80 8rnd 8.755" Surf 5,657'(TOW) 95/8„ 47 N-80 BTC 8.681" 7" 26 L-80 BTC Mod 6.276" 5,325' 9,255' 5" 18 L-80 STL 4.276" 8,907' 10,740' TUBING DETAIL 2-7/8" 6.5 L-80 1 8 rd AB Mod 1 2.441" Surf 8,786' JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item 1 38.50' 38.50' 2.323" (TVD) Tubing Hanger - Cameron 2 247' 247' 2.313" 4.620" Baker TES SSSV (16 each SS Bands) 9,390' 1,873' 1,870' 2.441" 4.750" GLM 1—CAMCO SFO -1 Open 3,405' 3,295' 2.441" 4.750" GLM 2—CAMCO SFO -1 6 4,627' 4,405' 2.441" 4.750" GLM 3—CAMCO SFO -1 ±9,696' 5,644' 5,295' 2.441" 4.750" GLM 4—CAMCO SFO -1 Re-perf 6,353' 5,959' 2.441" 4.750" GLM 5—CAMCO SFO -1 3 6,937' 6,516' 2.441" 4.750" GLM 6—CAMCO SFO -1 9,900' 7,393' 6,949' 2.441" 4.750" GLM 7—CAMCO SFO -1 Open 7,851' 7,385' 2.441" 4.750" GLM 8—CAMCO SFO -1 8,278' 7,793' 2.441" 4.750" GLM 9—CAMCO SFO -1 10,180' 8,674' 8,164' 2.441" 4.750" GLM 10—CAMCO SFO -1 4 8,716' 8,201' 2.313" 3.668" OTISX Nipple 6 8,750' 8,230' 2.406: 3.500" GBH -22 Locator & 11' of 3.234" seals & mule shoe 5 8,752' 8,232' 3.250" 5.687" Baker 84-32 DB Perm Packer w/ 6' mill -out extension 6 8,778' 8,254' 2.205" 3.668" ON XN Nipple 7 8,786' 8,261' 2.441" 3.580" 1 WLEGRw/ 2000 psi shear pump out plug Wireline Information: Date I Depth (MD) PERFORATION DETAIL 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261'cutto 30,267'fellto 10,684' Zone ( MD) (MD) (TVD) (TVD) SPF Fr Date Status H1 9,347' 9,390' 8,685' 8,715' 6 43' 11/25/2000 Open H1 9,465' 9,508' 8,766' 8,795' 6 43' 11/25/2000 Open HK2 ±9,644' ±9,696' ±8,890 ±8,926 ±52' Future Re-perf H2 9,706' 9,840' 8,933' 9,026' 6 134' 11/26/2000 Open H2 9,860' 9,900' 9,040' 9,068' 6 40' 11/26/2000 Open HK2 ±9,912' 1 ±9,950' 1 ±9,076 1 ±9,103 ±38' Future Re -Pert H2 9,950' 10,180' 9,103' 9,264' 6 230' 11/26/2000 Open H2 10,253' 10,422' 9,315' 9,433' 6 169' 11/26/2000 Open H2 10,455' 10,520' 9,456' 9,501' 6 65' 11/26/2000 Open Wireline Information: Date I Depth (MD) Description 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261'cutto 30,267'fellto 10,684' Updated By: JUL 04/16/19 100,000 W U a+O 1,000 - M a m _ 0 O O M d () LL � O 100 M N 0 O L F- 10 1 Jan -2000 HILCORP ALASKA LLC, MGS A34-11RD3 (200-089) MIDDLE GROUND SHOAL, MGS OIL Monthly Production Rates Cum. Prod Oil (bbls)- 725,967 — Cum. Prod Water (bbls): 53,999 Cum. Prod Gas (mcf): I 7T 209,615 °tP • 4y°6 �° a°� rcp � e ri 4 e 4b° c 9,p °e em •c - r m u' I Jan -2005 Jan -2010 Jan -2015 A Produced Gas (MCFM) m GOR Produced Water (BOPM) Produced Oil (BOPM) 100,000 .; W d M - 1 Jan -2020 SPREADSH EET_2000890_MGS_A-3411RD3_Prod-I nject_Curves_W el I_0 l_V 120_20190423.x1sx 4/24/2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS a,L V . O 1. Operations Abandon LJ Plug Perforations LJ Fracture StimulateLJ Pull Tubing Ll Operations shutdown Performed: Suspend ❑ Perforate ❑� Other Stimulate❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well[-] Re-enter Susp Well ❑ Other: ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska, LLC Development ❑r Slratigraphic ❑ Exploratory ❑ Service ❑ 200-089 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-10084-03-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0018756 / ADL0018754 MGS A34-11 RD3 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): NIA Middle Ground Shoal / E,F and G Oil, Middle Ground Shoal Oil Pools 11. Present Well Condition Summary: Total Depth measured 10,750 feet Plugs measured N/A feet true vertical 9,657 feet Junk measured 10,684 feet Effective Depth measured 10,684 feet Packer measured 8,752 feet true vertical 9,613 feet true vertical 8,232 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 300' 24" 300' 300' Surface 1,644' 13-3/8" 1,644' 1,641' 2,730 psi 1,130 psi Surface 5,657' 9-5/8" 5,657' 5,306' 6,330 psi 3,810 psi Intermediate 3,930' 7" 9,255' 8,620' 7,240 psi 5,410 psi Liner 1,833' 5" 10,740' 9,651' 9,910 psi 10,500 psi Perforation depth Measured depth 9,347 - 10,520 feet True Vertical depth 8,685 - 9,501 feet Tubing (size, grade, measured and true vertical depth) 2-7/8" 6.5# / L-80 8,786 (MD) 8,261 (ND) 8,752 (MD) 247 (MD) Packers and SSSV (type, measured and true vertical depth) Baker DB Perm PKR 8,232 (TVD) Baker TE5-SSSV 247 (TVD) 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 82 26 9 436 1 85 Subsequent to operation: 80 21 9 433 1 90 14. Attachments (required per 20 MG 25.070, 25.071, s 25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Gas L WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318-482 Authorized Name: Stan W. Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dmarlowe@hilcorp.com Authorized Signature: 4 L^D Date: 3 { 1 5 Contact Phone: (907) 283-1329 IMS AR 1 22019 Form 10-404 Revised 4/2017 J t ��/� Submit Original Only Middle Ground Shoal Last Well: Completed: 12-02-2000 SCHEMATIC PTD: 200-089 corn Alaska, LLC API: 50-733-10084-03 KB: 38', RKBtoMSL=73', RKBto mudline 189 CASING DETAIL PBTD: 10,698' TD: 10,750' Size Wt Grade Conn ID Top Btm 24" 38.50' Conductor (TVD) Surf 300' 13-3/8" 54.5 J-55 BTC 12.615" Surf 1,644' 95/8„ 43.5(15 its) 47 N-80 N-80 8 m BTC 8.755" 8.681" Surf 5,657'(TOW) 7" 26 L-80 BTC Mod 6.276" 5,325' 9,255' 5" 18 L-80 STL 4.276" 8,907' 10,740' TUBING DETAIL 2-7/8" 6.5 L-80 8 rd AB Mod 1 2.441" Surf 8,786' JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item 1 38.50' 38.50' 2.323" (TVD) Tubing Hanger - Cameron 2 247' 247' 2.313" 4.620" Baker TES SSSV (16 each SS Bands) 9,390' 1,873' 1,870' 2.441" 4.750" GLM 1—CAMCO SFO -1 Open 3,405' 3,295' 2.441" 4.750" GLM 2—CAMCO SFO -1 6 4,627' 4,405' 2.441" 4.750" GLM 3—CAMCO SFO -1 9,696' 5,644' 5,295' 2.441" 4.750" GLM 4—CAMCO SFO -1 Open 6,353' 5,959' 2.441" 4.750" GLM5—CAMCOSFO-1 3 61937' 6,516' 2.441" 4.750" GLM 6—CAMCO SFO -1 9,900' 7,393'6,949' 9,068' 2.441" 4.750" GLM 7—CAMCO SFO -1 Open 7,851' 7,385' 2.441" 4.750" GLM 8—CAMCO SFO -1 1 5 8,278' 7,793' 2.441" 4.750" GLM 9—CAMCO SFO -1 10,180' 8,674' 8,164' 2.441" 4.750" GLM 10—CAMCO SFO -1 4 8,716' 8,201' 2.313" 3.668" OTIS%Nipple 6 8,750' 8,230' 2.406: 3.500" GBH -22 Locator & 11' of 3.234" seals & mule shoe 5 8,752' 8,232' 3.250" 5.687" Baker 84-32 DB Perm Packer w/ 6' mill -out extension 6 8,778' 8,254' 2.205" 3.668" OT OTISXNNipple 7 8,786' 8,261' 2.441" 3.580" w/ 2000 psi shear pump out plug Wireline Information: Date I Depth (MD) PERFORATION DETAIL 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261' cut to 10,267' fell to 10,684' Zone (MD) (MD) (TVD) (TVD) SPF FT Date Status H1 9,347' 9,390' 8,685' 8,715' 6 43' 11/25/2000 Open HS 9,465' 9,508' 8,766' 8,795' 6 43' 11/25/2000 Open HK2 9,644' 9,696' 8,890 8,926 5 52' 02/26/2019 Open H2 9,706' 9,840' 8,933' 9,026' 6 134' 11/26/2000 Open H2 9,860' 9,900' 9,040' 9,068' 6 40' 11/26/2000 Open HK2 9,912' 9,950' 1 9,076 1 9,103 1 5 38' 1 02/26/2019 Open H2 9,950' 10,180' 9,103' 9,264' 6 230' 1 11/26/2000 Open H2 10,253' 10,422' 9,315' 9,433' 6 169' 11/26/2000 Open H2 10,455' 1 10,520' 9,456' 9,501' 6 65' 11/26/2000 Open Wireline Information: Date I Depth (MD) Description 2/25/2017 1 10,684' 2-1/2" scratcher to 10,261' cut to 10,267' fell to 10,684' Updated By: JILL 03/11/19 HHilcorp Alaska, LLC Hilcorp Alaska. LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date MGS A34-11RD3 Eline 50-733-10084-03-00 200-089 2/26/2019 2/26/2019 Daily Operations: 02/26/19-Tuesday Move E-Line equip. from Leg 4 to leg 2. M/U X-Over's, Pump In Sub. W/L Valve, and lubricator. M/U GR, CCL, and 20'of 1.75" retrievable tubing guns, 5 SPF 60 deg. phased, 1705 Razor XDP Charges. CCL is 8.9' above top shot. Pressure test lubricator and associated equipment to 250 psi low/ 3000 psi high in accordance with AOGCC approved sundry. RIH w/ well flowing to 10,020' and log up to 9,500'. Discuss w/ town. Re-log 9,800' to 10,000', and 9500' to 10,020. Drop correlation 17' as per geo. Correlate on depth and per' 9,930'-9,950'=20'. Good indication of guns firing on surface. Tubing pressure increased from 73 psi to 75psi=2psi increase. POOH- all shots fired. M/U 18'of 1.75" retrievable tubing guns, 5 SPF 60 deg. phased, 1705 Razor XDP Charges. CCL is 10.3' above top shot. RIH w/ well flowing and tag at 10,598'. Log to 8,633' and send to town. Correlate on depth and per' 9,912'-9,930'=18'. Good indication of guns firing on surface. No chg in tb pressure=74psi. POOH- all shots fired. M/U 26'of 1.75" retrievable tubing guns, 5 SPF 60 deg. phased, 1705 Razor XDP Charges. CCL is 11' above top shot. RIH w/ well flowing and log from 9,700' to 9,500' and send to town. Come up 12' on correlation per Geo. Perf 9,670'- 9,696'=26'. Good indication of guns firing at surface. No change in tb pressure=77psi. POOH- all shots fired. M/U 26'of 1.75" retrievable tubing guns, 5 SPF 60 deg. phased, 1705 Razor XDP Charges. CCL is 11' above top shot. RIH w/ well flowing and correlate on depth. Perf 9,644'-9,670'=26'. Good indication of guns firing at surface. No change in tb pressure=74psi. POOH- all shots fired. L/D spent guns and lubricator. Night cap and secure well. SDFN From: Patricia Bettis To: Well History File Date: February 9, 2017 Re: Well Name Change (PTD 200-089) At the request of Hilcorp, the well name for MGS A34-11LS2 was changed to MGS A34-11RD3 effective February 9, 2017. SChH0.0 JUN 0 22017, a. aJ ani fp ni, on C 13 cu �� v hA 0 0 J L CU W err off; M �' N ,i; ----(I)-- " z 0 I . - I 4"N - f*iiS,pit,-, i 1 jI -x.. 000 -+ } i • g V x •Ni • C , - o M u C U Nca i Q) I • iqr M c/f M Q M Q c N a E as Z — m cd'' w M Z 4 X Q" X ai 0 OU C = X co 2 X UO X C E N a) a) > a) co .� E c a- v E +6 a) (J z 7a) Y Ya) Y u u 00 U N CO C L Co a v v -g ril iii a) 4- "0 - E in C L Co e-1 N CO C N ++ 1.4 06 CS o2S a a a ++ 4-, ++ C C C (1) a) a) fa u O O O V > > > a) a) a) in 0 0 0 l0 N 00 CT 0 0 4-+0° 0 0 I-- 1.n vi o I0 0o al o e-1 .-1 r-1 N o O O O 9 O O O O O O O d' 4 4co co oo 4 Cl. co Q O 0 0 O r-1 r-1 1-1 N-1 M M M M O MM M M 4, N N N N V1 O O O O i11 u'1 1.r) u'1 CJ L a) O 3 a) E C CU Coc Z .0 L N N 0 to N ! N v--1 r 1 .-1 1 e-I ri 1--1 e I M M v 4 v N Q 4 4 4 4 • . Bettis, Patricia K (DOA) "71J) •Z00 From: Bettis, Patricia K (DOA) Sent: Thursday, February 09, 2017 10:13 AM To: Larry Greenstein (Igreenstein@hilcorp om) Subject: MGS A34-11RD3 Larry, Per your request dated (1/26/2017),the AOGCC is changing the name of MGS A34-11 LS2 to MGS A34-11RD3 (PTD 200- 089). Patricia Bettis Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission SCANNED JUN 0 2 333 West 7th Avenue 201 7 Anchorage, AK 99501 Tel: (907) 793-1238 CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Patricia Bettis at(907)793-1238 or patricia.bettis@alaska.gov. 1 • • Bettis, Patricia K (DOA) �',�I a G -o From: Larry Greenstein <Igreenstein@hilcorp.com> Sent: Thursday,January 26, 2017 9:18 AM To: Bettis, Patricia K (DOA) Subject: FW: Middle Ground Shoal - Last Three Well Name Changes • Attachments: 20170113 MGS Well Name Changes.xlsx; MGS A34-11 name change.pdf; MGS A41A-11 name change.pdf; MGS C32-23 name change.pdf; Swanson River Well Naming Conventions diagram.pdf Hi Patricia Did the explanation below of the problem with showing all the old holes on a single schematic make sense?? Would you like to discuss the options for changing the well names to something more appropriate to the API number than using the lateral designations?? These last three wells are the most confusing of the name changes because the first sidetrack changed the well number completely due to the new bottomhole location (using the federal naming convention method—attached above). That naming convention has caused problems for SRF wells too, but it is what it is and we find a way to make it work even though there are a good number of exceptions to the basic naming rules. It's why I summarized the abandoned completions on the schematic with dates and APIs rather than draw them in. Call me anytime to discuss and thank you for working through all these name changes. Larry 777-8322 From: Larry Greenstein Sent: Friday,January 20, 2017 2:02 PM To: 'Bettis, Patricia K(DOA)' <patricia.bettis@alaska.gov> Subject: RE: Middle Ground Shoal: Well Name Changes Understand, Patricia I was trying to get these name changes done with historical information so we can get on with making the new well signs for the platforms. For a `clear and understandable public record' we unclutter most all of our schematics to show only the current producing or injecting wellbore, not all the lost holes, P&A'd completions and previous well names. They can just get too busy for a single sheet of paper. We continually try not to confuse people, that use the schematics, with obsolete information crammed on the page. As you allude, the current wellbore sketch is what we build for public use. With proposed schematics (like the KRU 1 B- 15A schematic you included), we do show the current and proposed future wellbores. Once completed (ie the original wellbore has been abandoned) and reported, we show only the current wellbore on future schematics (as with KRU 1B- 15A pgs 6 & 29 in your electronic well files). Imagine carrying this on when there are 4 or 5 sidetracks in the historical record. There's no way to show all that on one page. This is different from a multi-lateral well, where you have a number of currently active completions (.60, .61, .62 etc). These would be shown on the schematic branching off of the mother wellbore as they are open for production/injection. Are you sure you want all this extra abandoned information on the current wellbore schematic?? This isn't meant to be an as-built, it's a schematic to know what's looking at you when you run into the well with wireline tools. That's why I took our 1 • current schematics and added the historical references to previous abandoned versions of the well to the existing wellbore on the schematics. Larry From: Bettis, Patricia K(DOA) [mailto:patricia.bettis@alaska.gov] Sent: Friday,January 20, 2017 11:07 AM To: Larry Greenstein <Igreenstein@hilcorp.com> Subject: Middle Ground Shoal: Well Name Changes Larry, Please see highlighted paragraph. For a clear and understandable public record, Hilcorp needs to provide a current wellbore sketch for C34-11LS2, A41A11LN, and C32-23LW that shows all sidetracks drilled from the original well. The original well and all sidetracks need to be clearly labelled. I have attached a simple example from the Kuparuk River Unit of such a sketch. This wellbore sketch shows the original wellbore and the initial proposed sidetrack. Other sidetracks or lateral could be added in the future to this sketch to show the progression of the wells' history. Thanks, Patricia From: Bettis, Patricia K(DOA) Sent:Thursday,January 12, 2017 11:40 AM To: Larry Greenstein (Igreenstein@hilcorp.com) <Igreenstein@hilcorp.com> Subject: Middle Ground Shoal: Well Name Changes Larry, I'm in agreement with all the requested well name changes, except: C34-11LS2,A41A11LN and C32-23LW. The first sidetrack from each of these wells had a name change from the original well drilled. For example, C24-14 was drilled. It was later sidetracked and that sidetrack was renamed C32-23. The second sidetrack was named C32-23LW. This would make the revised name C32-23RD2,which agrees with the API No. 50-733-20251-02-00. For C34-11LS2, A41A-11LN, and C32-23LW, please provide a'current wellbore sketch of each well that shows all sidetracks drilled from the original well. Please label the original well and all sidetracks. . Thank you, Patricia 2 023 '/"L ! Middle Ground Shoal Well:A34-11LS2 SCH MATI C Last Completed:12-02-2000 PTD:200 089 IIilcorp Alneka,LL(: API: 50-733-10084-03 KB: 38' MSL=73' CASING DETAII. ,•'. _ (1 ,y Size Wt Grade Conn ID Top Btm 13-3/8" 54.5 J-55 Surf 1,644' 9-5/8' 43.5 N-80 Surf ,` r 9 5/8" 47 N-S0 5,657'(TOW) D 7" 26 L-80 BTC Mod 5,325' 9,255' 13-3/8' 5" 18 L-80 STI 8,907' 10,740' TUBING DETAIL r 2-7/8" 6.5 L-80 8rd EUE Surf 8,786' f) r JEWELRY DETAIL r' No Depth Depth ID Item (MD) (TVD) 1 247' 247' Baker TE5 SSSV jii 2 1,873' 1,870' GLM 1 3 3,405' 3,295' GLM 2 " 4 4,627' 4,405' GLM 3 , ; U 0 5 5,644' 5,295' GLM 4 '' :i'l 6 6,353' 5,959' GLM 5 I. 4 7 6,937' 6,516' GLM 6 ' :7-1) !" 8 7,393' 6,949' GLM 7 -i 9 7,851' 7,385' GIM 8 1 10 8,278' 7,793' GLM 9 Dki 11 8,716' 8,201' 2.313" 2-7/8"X Nipple 9-5/8" ,••. 12 8,744' 8,225' GLM 10 rrry ' 13 8,752' 8,232' 7"Baker DB Perm Packer r�t :i 14 8,778' 8,254' 2.205" 2-7/8"XN Nipple 15 8,786' 8,261' WLREG [l'icl., 4 x •t1 #' ••• PERFORATION DETAIL I,.. XN i Btm ,'W Zone Top(MD) Btm(MD) Top(TVD) (TVD) FT Date Status H1 9,347' 9,390' 8,685' 8,715' 43' s H1 9,465' 9,508' 8,766' 8,795' 43' ' r /jrr H2 9,706' 9,840' 8,933' 9,026' 134' y4'1� 'l• i 01%)114' f y'►} •, 112 112 9,860' 9,950' 9,900' 10,180' 9,040' 9,103' 9,068' 40' d9,264' 230' V :'A;' j' ►''' H2 10,253' 10,422' 9,315' 9,433' 169' i)*;1 112 10,455' 10,520' 9,456' 9,501' 65' fir; I D 'Ct.•vK-w�ct..r� ' 11. o Wil/ 4 2 (ifi fl 0 6) > r� ?1-/---- // (4N! , v/ Lcvvim. lc?6'k•.,.. ,_ ..4 fq ,3z7- /(i___ 5 ce-laf,o 0.2) q �o �� .,z? _A__ 5q, /(LS i2.. Le(-69 PBTD:10,698' TD:10,750' `_ I;IA' / A . fir 1 VIAd4/1/L .-- //;4(d-4/1e--- i(}- , 1 G--, --ft k.D. �L 4..3V /l� J Updated By:11L 01/12/17 • • I-- -4- . (D 00 t 0 M V 0 O MO O U o 00c. 7a) Z U) C � N o (p O ci U O (0 eL O) i � 0 co O N xj .-- �Gl O lV d © 0p r r r J OQ 0 a C '-- 0 ii c0 O V U (V ��. V U V t} (n cei v [• > in C tfj p O O (� V' tll E0 Ul (� • J Q 1:3 of). : ED CVco Vl _ - X U (U •• apo .—— ' ab O •o ce) 0 h U) C ti 0? r- co ti O N N O h 0 O � 'r 8 £ to N th O. cop4. o)) - U) m t- Ca fit Ni 1JH M JIh : c3 ai00 .�i-- U 10 in oo cn �. M , ' \ in N p ` M O 1 !1 ( O ` O U �MM t`nM OD ` h N (Zr *U S O , O U ti,o OD Ni ` Q OQ D9 h T • y4 I �7 ." •D p 0 � Oo U as•- C T DO .. N I If .4.:., . L CO m N N O Nip CIo CO ° COin � • CO Ts I x .0 r W (My — N 1-- co E d' C � � � 0 Oh rna ,p v T F M CD co M N 03 .oEC .r (p Q p.. 3 a� �` co is e N V o (1) r(rfn) c Gi. c(U a) c z V> IBJ CO CO F.- • V o N (n N " ' II. CO� Q m J Or Q Im~ Project Well History File Cov~;~age XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. CAN DIGITAL DATA Color items: [] Diskettes, No. Grayscale items: [] Other, No/Type [] Poor Quality Originals: Other: NOTES: BY: BEVERLY ROBIN VINCENT SHERY~INDY OVERSIZED (Scannable) [] Maps: · [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other Project Proofing BY: BEVERLY ROBIN VINCENT SHERYL~WINDY Scanning Preparation x 30 = + BY: BEVERLY ROBIN VINCENT SHERYL ~)WINDY /? : TOTALPAGES 7¢ Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: ~.: C~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: / YES Stage 2 BY: (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) NO IF NO IN STAGE 1, PAGE(S) DlSCREPA~,~RE FOUND: YESNO III IIIIIIIIIII II III RESCANNEDBY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: Isl General Notes or Comments about this file: Quality Checked 12110/02Rev3NOTScanned,wpd e e ~TO ~kRGY RECEIVED JUN 0 9 2006 Alaska Oil & Gas Cons. Conmission Anchorage XTO Energy Inc. 200 North Loraine Suite 800 Midland, Texas 79701 432-682-8873 432-687-0862 (Fax) June 5, 2006 "1':( . ;j\.1A~~i:',· . ·i Alaska Oil and Gas Conservation Commission Attn: Mr. John Norman 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 ;},oO' O<&C RE: Sundry Well Operations Report: Well #A34-11LS2 - Coil Tubing Stimulation Dear Mr. Norman, XTO Energy, Inc. hereby submits its Sundry Operations Report (Form 10-404) for the coil tubing stimulation performed on the producing well #A34-ll LS2. This well is located on Platform A, in the Middle Ground Shoal Field of Cook Inlet, AK. Please find attached the following information for your files: 1. Form 10-404 Sundry Well Operations Report 2. Daily Report of Operations 3. Present Wellbore Schematic If you have any questions or require additional information, please contact me at (432) 620-6742. Sincerely, 911~ Jeff Gasch Production Engineer Cc: Paul Figel Scott Griffith Tim Smith STATE OF ALASKA _ JUN 0 9 2006 ALA~OIL AND GAS CONSERVATION COM~ION Alaska Oil & Gas Cons C " REPORT OF SUNDRY WELL OPERATIONS Anchorag~ Of\'IJJisslon 1. Operations Abandon U Repair Well U Plug Perforations U Stimulate l:J Other U Performed: Alter Casing D Pull Tubing D Perforate New Pool D Waiver D Time Extension D Change Approved Program D Opera!. Shutdown D Perforate D Re-enter Suspended Well D 2. Operator XTO Energy Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 0 ' Exploratory D 200-089 , 3. Address: 200 N. Loraine, Ste 800, Midland, Texas 79701 Stratigraphic D Service D 6. API Number: 50-733-10084-03 7. KB Elevation (ft): 9. Well Name and Number: 38' A34-11 LS2 .' 8. Property Designation: 10. Field/Pool(s): ~/F,~ tJl/ß<.,1 - 'Z ..¡ /1'<,/ ADL-18756 & 18754 Middle Ground Shoal ; h ,,-/~,c(. 11. Present Well Condition Summary: , .' Total Depth measured 10750 feet Plugs (measured) None true vertical 9657 - feet Junk (measured) None Effective Depth measured 10698 feet true vertical 9623 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 1664' 13-318" 1664' 1661' 2730 1130 Intermediate 5657' 9-5/8" 5657' 5307' 6330 3810 Drlg Liner 3930' 7" 9255' 8620' 7240 5410 Liner 1833' 5" 10740' 9650' 10140 10490 Perforation depth: Measured depth: 9347 - 10520' True Vertical depth: 8685 - 9501' Tubing: (size, grade, and measured depth) 2-7/8" L-80 8786' Packers and SSSV (type and measured depth) 7" Baker DB Perm pkr @ 8752' & 2-7/8" Baker TE5 SSSV @ 247' 12. Stimulation or cement squeeze summary: Intervals treated (measured): 9347 - 10520' RBDMS 8Fl ,JUN f 4 2006 Treatment descriptions including volumes used and final pressure: Pump 357 bbls Paravan 25 pre-flush @ 1 bpm & 4600 psi. Acidized w/9, 1 00 gals 10% HCL through coil tubing. Final inj pressure - 4000 psi @ 1 BPM 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 128 . 88 , 4 455 70 Subsequent to operation: 142 128 - 22 535 80 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run ExploratoryD Development 0 Service D Daily Report of Well Operations X 16. Well Status after work: Well Schematic Oil0 Gas D WAG D GINJ D WINJ D WDSPL D 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I~Undry Number or N/A if C.O. Exempt: 305-142 Contact Jeff Gasch Printed Name Jeff Gasch Title Production Engineer Signature OÆ1iJ- Phone 432-620-6742 Date 6/5/2006 Form 10-404 Revised 04/2006 ORIGINAL .¡ '" ( -0<4..d Submit Original Only ~ 14 *,'I('a(~ t.-r~·bb - Page 1 of 2 XTO'Energy - Midland District Workover Report . . ' M.and Well W orkover ReìJort IIMIDDLE GROUND SHOAL A Objective: Mobilize Equipment. First Report: AFE: 5/3/06 II II Well # 34-11LS2 II 05/03/2006 505348 Prep CTU equip to move from C to A. Crane work on A moving chemicals. Test 128 BO, 4 BW & 88 MCF. 5/4/06 Back load BJ equipment off platform C. Off load BJ equipment on platform A. Spotting coil equipment - Cleaning rust out of pits. 5/5/06 Continue rigging up equipment.Rinse pits wI FIW and send water to disposal well. Fill pit wI fresh water. (continuing to RU CT equipment). 5/6/06 Take on FIW in pits, mix to 3% wI KCL. Off load boat with BJ pump, acid tanks & chemicals. RU pump. Fill frac tank wI fresh water. Mix US-40 wI fresh water in pits. (continue to prep for acid job). 5/7/06 Finish mixing acid in frac tank. (finish prep for acid treatment) 5/8/06 Move flow-back tank from Platform C and RU MU CT BHA. Stabbed inj head. Test BOP to 250/5000 psi. PT lines to 250/6,000 psi. Test flow-back lines to 1,000 psi. (Jim Regg waived witness) PJSM. RIH with vortech wash nozzle @ 80 fpm. Pmpd 3% KCL water @ 1.25 bpm & 2,900 psi. Wash perfs wI 3% KCL water @ 10 fpm, pumping 1.25 bpm @ 4,100 psi. 5/9/06 Wash perfs f/1O,300-1O,520' @ 10 fpm pumping 1.25 bpm @ 4,500 psi. Tag PBTD @ 10,702'. Laid 21 bbls 10% HCL across perfs from 10,530-9,340'. Let soak 30 min. Circ acid to flow-back tank wI 90 bbl 3% KCL. SI WHo Pump 357 bbls Paravan 25 Preflush @ 1 bpm & 4,600 psi while making 4 passes across perfs. Pmpd 217 bbls 10% HCL @ 1 bpm & 4,100 psi while making 3 passes across perfs. Flush acid wI 30 bbls 3% KCL @ 1 bpm & 4,000 psi. ISIP 2,500 psi, 5 min 1,500 psi, 10 min 1,200 psi. Open WHo POOH to 7,000'. Pmpd 140,000 scf N2 while RIH to 8,800'. Rec 74 bbls fluid. pH dropped from 7 to 2 after 69 bbls recovered. Start POOH wI CT. 5/1 0/06 Fin POOH wI coil. Swabbed in 11 bbls. 85 bbl tot load recd. SWI. RD BJ coil tbg. RU PTS tank to well & prod header. OWU & start gas lift. Cont monitoring PTS tank & pump returns down disposal well. At 06:00 recd 323 bbls tot load (238 gas lifted + 85 bbls N2 jet). Rtns have PH 0-1. 5/11/06 Recovering acid load. Injecting rtns down disposal well. Loaded BJ equip on boat. Prod 259 bbls @ ±85% oil cut in 24 hrs. At 0600 recovered 582 bbls total. Load to recover is 630 bbls. pH = 3. 5/12/06 Monitor back flow tank and inject returns down disposal well. Clean & organize decks, unload & move elect. Equipment from Plat C. Clean pits. Continue monitoring tank & inject returns @ 0600, recoverd 697 bbls with gas lift + 85 coil jetted with nitrogen = 782 bbls total. PH = 4. 5/13/06 Put well into production system @ 0700 hrs. Pump fluid from flow back tank to disposal. RD flow-back tank. 5/14/06 24 hr test - 142 bopd I 46 bwpd 1148 mcfpd. ' http://dor/repC workover.asp 6/512006 XTO'Energy - Midland District Workover Report ~~~"'~~~~-~~-~~,-- 5/16/06 12 hr test - 143 bopd 139 bwpd 1 113 mcfpd. ----- Page 2 of 2 ",~~M""''''''''''''''''''¥_....._.________________________''''''~~''''''''''''''''''''''~ 5/17/06 12 hr test - 141 bopd 136 bwpd 1112 mcfpd. 5/19/06 12 hr test - 140 bopd 1 31 bwpd 1 116 mcfpd. 5/20/06 12 hr test - 139 bopd 130 bwpd 1108 mcfpd. 5/21/06 12 hr test - 137 bopd 128 bwpd 1146 mcfpd. http://dor/repcworkover.asp 6/5/2006 r ¡[rag MGS A34-11 LS2 Cook Inlet, Alaska Leg 1, Conductor 4 API: 50-733-10084-03 Original Spud: Oct '65 (A23-12) Sidetrack A34-11: 11-2-84 Sidetrack A34-11LS: 7-1-95 Sidetrack A34-11 LS2: 9-27-00 Surf Csg: 13-3/8" 54.5# J-55. Set @ 1644'. Cmtld wi 1900 sk. Intermed: 9-5/8" 43.5# & 47# N-80. Window @ 5657' (9-27-00). (Original Depth Set @ 6747'.) Cmt'd w/11 OOsk. Drilling Liner: 7" 26# L80 BTC Mod. Set @ 9255'. TOL @ 5325'. Cmt'd wi 580sk. TOC by CBL @ 7330' Prod Liner: 5" 18# L-80 STL. Set @ 10,740'. TOL @ 8907'. Cmt'd w/142 sk. Baker ZXP Liner top Pkr. e PBTD: 10,698' MD (9,623' TVD) TD: 10,750' MD (9657' TVD) e REC1=I\/J::n PLF 7-1-05 KB: 38' Water Depth: 73' Tbg: 2-7/8" 6.5# L80 8rd EUE ABMod. Set @ 8786' on 12-2-00. GLM MD TVD Port Psc Pso 1 1873 1871 12 890 950 2 3405 3295 12 877 923 3 4627 4406 16 860 928 4 5644 5294 16 843 895 5 6353 5961 16 830 871 6 6937 6517 20 814 871 7 7393 6948 20 799 856 8 7851 7385 20 784 834 9 8278 7794 20 769 813 10 8744 8276 16 Orifice Valve 2-7/8" Baker TE5 SSSV @ 247'. 2-7/8" X Nipple (2.313" ID) @ 8716' 7" Baker DB Perm Pkr @ 8752' 2-7/8" XN Nipple (2.205" ID) @ 8778'. WLREG @ 8786' Perfd @ 6 spf @ 60 deg HC: 9347'-9390' HE: 9465'-9508' HK: 9706'-9840', 9860'·9900' HN: 9950'-10,180' HR: 10,253'-10,422', 10,455'-10,520' Re: Sundries #305-142 for A43-11LS2 & #305-116 for C21A-23 ~ e Hi Paul, The sundries are still good. Unlike permits to drill, they don't expire in 2 years although in the next regulation redo I think a 2 year limit will be placed on them. Good of you to check. I think that regardless of the sundry still being "good", it is important to recheck what was planned versus new or changed well conditions. I will place a copy of this message in the well files. When you get the new procedure/fluid/schedule determined for A34-11LS2 just send it in by email. Call or message with any questions. Tom Maunder, PE AOGCC ?_a u_~_£i:g""..~~.?S!:g."".~!'::r.::9Y.:..s::S::!!l wro t e , On 4/ 13 /2 0 0 6 5: 54 AM: Tom, These are 2 wells that I had planned doing coil tbg stimulations last summer but got put on hold. I now have the green light. The Sundries were approved in June '05 for the A34-11LS2 & May '05 for the C21A-23. Is there a time that a granted Sundry expires? There are no changes to the C21A-23. However, there will be some changes to the stimulation fluid & pump schedule on the A34-11LS2. I had Hemlock cores samples sent in for testing where I damaged the core w/ oil based mud & had BJ try to find the best antidote to regain the core perm. The lab report was supposed to be in yesterday but still waiting. The work I scheduled is to begin on Monday April 24th. When I get the core lab test report on the A34-11lS2, I'll e-mail to replace the Procedure dated 6-4-05. Let me know if the Sundries are good to go or if they are expired. Thanks, Paul Paul Figel Engineering Manager XTO Energy Inc. Midland, TX Office: 432-620-6743 Mobil: 432-553-5217 Fax: 432-687-0862 ".:.:,r \'\M~)W"~ , 'S.~''':fft\;" \,.; ,~~.", 1 ? 1 of 1 4/13/20068:25 AM 'ffù.\L.·.' 1. r.' ~·í"""\ð:· 1'. ·f' '. " rç.F . \..... J ~ . j,.; . 'J ,. , .~ ~ ~ a ,'f . ~ ~ ~ ~ F WU~1JuLb p-.n·· 1· ,d . ., J ; ¡ ¡ :I!-' "J ,1" !9U ] '1 !y\ {~ni7 11\ i~ lL LFJ ~) U':i Ifl~ j 1 ! ! I t ! ! j ¡ ¡ II FRANK H. MURKOW5KI, GOVERNOR A.I~A.SKA. OIL AND GAS CONSERVATION COMMISSION 333 W. -¡rn AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Paul Figel Engineering Manager XTO Energy Inc. 200 N. Loraine, Suite 800 Midland, Texas 79701 øC' :l00 ...0 V Re: Middle Ground Shoal A34-11 LS2 Sundry Number: 305-142 SCANNED JUN 1 4 2005 Dear Mr. Figel: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on 0 'day or weekend. A person may not appeal a Commission decision to Superior ou unless rehearing has been requested. ---- DATED this~ day of June, 2005 Encl. ~TO ~kRGY XTO Energy Inc. 200 North Loraine Suite 800 Midland, Texas 79701 432-682-8873 432-687-0862 (Fax) June 4, 2005 Alaska Oil and Gas Conservation Commission Attn: Mr. John Norman 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 R', r;;;:: ~ en,,,.... " ~,~':I:[";.. .'"i._:' .i' "", . Iii. ...1., h I In,'~ I';J .. I.,') 0,:, .5 ¡..¡,..II~ 'H- ~ t. J , JUask~~ RE: Request for Sundry Approval to stimulate well A34-11 LS2. \,~ ..., .,.a~is8im1 Dear Mr. Norman: XTO Energy, Inc. hereby submits its Application for Sundry Approval to stimulate well A34-11 LS2 on Platform A, in the Middle Ground Shoal Field of Cook Inlet. The well was drilled in the West Flank Hemlock reservoir in Sept 2000 that has never been a good performer. It is presumed that the well was damaged during the drilling phase. Based upon lab testing, the 2 stimulation fluids proposed can improve the permeability of a core plugged with oil based mud. This treatment will be done using coil tubing. Please find attached the following information for your files: 1. Form 10-403 Application for Sundry Approval 2. JobProcedure 3. Present Wellbore Schematic It is intended, for financial reasons, that the A34-11 LS2 follows the already approved stimulation on the A11-12 WIW that is scheduled for June 13,2005. I apologize for the short notice, but would appreciate if the commission could approve & FAX this Sundry as soon as possible. Please contact me with any questions @ 432-620-6743. Fax # 432-687-0862. Sincerely, 9 -i ¿J. (;~ Paul L. Figel Engineering Manager Cc: Scott Griffith Tim Smith OR\G\NAL -- STATE OF ALASKA C/J.f6-7-D~ ~~ RECEIVEDJ ALASKA Oil AND GAS CONSERVATION COMMISSION 0/5 / Þtr APPLICATION FOR SUNDRY APPROVAL -?6- JUN 072005 (, I~ ~~e~;~~h~~~wn U Perforate U A~~1tgt§t GliS Ccns·&tRw~ion Plug Perforations D Stimulate 0 Time Extension D Anchorage Perforate New Pool D Re-enter Suspended Well D 4. Current Well Class: 5. Permit to Drill Number: Development 0 Exploratory D 200-089 ~ Stratigraphic D Service D 6. API Number: 50-733-10084-03 ../ Abandon U Alter casing D Change approved program D 2. Operator Name: XTO Energy Inc. 3. Address: 1. Type of Request: 200 N. Loraine, Suite 800, Midland, Texas 79701 7. KB Elevation (ft): 38' 8. Property Designation: ADL 18756 & 18754 11. Total Depth MD (ft): 10,750' Casing Structural Conductor Total Depth TVD (ft): 9657' Length Suspend U Repair well D Pull Tubing D 9. Well Name and Number: A34-11 LS2 10. Field/Pools( s): Middle Ground Shoal PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): 10,698' 9623' Size MD TVD Plugs (measured): N/A Junk (measured): N/A Burst Collapse Surface 1664' 13-3/8" 1664' 1661' 2730 psi 1130 psi Intermediate 1 5657' 9-5/8" 5657' 5307' 6330 psi 3810 psi Drlg Liner 3930' 7" 9255' 8620' 7240 psi 5410 psi Liner 1833' 5" 10,740' 9650' 10,140 psi 10,490 psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9347-10520' 8685-9501 ' 2-7/8" L80 8786' Packers and SSSV Type: 7" Baker DB Perm Pkr & 2-7/8" Baker TE5 SSSV Packers and SSSV MD (ft): Pkr @ 8752' & SSSV @ 247' 12. Attachments: Description Summary of Proposal L:.J Detailed Operations Program D BOP Sketch D 14. Estimated Date for Commencing Operations: 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Namn Paul Figel . Title Engineering Manager Signature 1--1 ~ ~. ~ Phone 432-620-6743 Date ð COMMISSION USE ONLY 6/17/05 Date: 13. Well Class after proposed work: Exploratory D Development 0 Service D 15. Well Status after proposed work: Oil 0 Gas D Plugged D Abandoned D WAG D GINJ D WINJ D WDSPL D Paul Figel, 6/3/2005 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: - -30::J - / l/ ..;2... Plug Integrity D BOP Test ~ Mechanical Integrity Test D Location Clearance D Other: soot <:.\' ~-ç>~$:~. tA..,.V\6..~~'J-. \Nq, \, (.0"'-\\"0\ ~\,)\\>~ t'\- o..c..(l)~' ~ ~~~~~dS,~<6'=> (t)),~), Approved I:j' , RBDMS BFL JUN 0 8 2005 COMMISSIONER APPROVED BY THE COMMISSION 6#( Date: '- OR\G\NAL Submit in Duplicate -~TO ~kRGY WELL DATA: SURFACE CASING: INTERMEDIATE CSG: DRILLING LINER: PRODUCTION LINER: PBTD: TUBING: KB: PERFS: SMALLEST ID: PACKER: MAX DEVIATION: BHP: BHST: OBJECTIVE: XTO ENERGY INC. MGS A34-11LS2 - WEST FLANK PRODUCER COOK INLET, ALASKA COIL TBG STIMULATION PROCEDURE 13-3/8" 54.5# J55 BTC. Set @ 1,644'. Cmt'd wi 1,900 sk. 9-5/8" 43.5# & 46# N80 BTC. Window @ 5,657'. (Orig Csg set @ 6,747' & cmt'd wi 1 , 1 00 sk.) 7" 26# L80 BTC set @ 9,255'. TOL @ 5,325'. Cmt'd wi 580 sk. TOC @ 7,330'. 5" 18# L80 STL. Set @ 10,740'. TOL @ 8,907'. Cmt'd wi 142 sk. 10,698 ' 2-7/8" 6.5# L80 EVE 8rd @ 8,786'. 38' HC: 9347 - 90', HE: 9465 - 9508', HK: 9706 - 9840' & 9860 - 9900', HN: 9950 -10,180' & HR: 10,253 -10,422' & 10,455 -10, 520' (714' Net Pay) 2-7/8" XN Nipple @ 8,778' (2.205") 7" Baker DB perm pIa @ 8,752' 45- 48 degrees b/w 9,318 -10,740' 3,200 psi 165 Deg F Stimulate well by washing perfs with solvent & acid using coil tbg. NOTES: . Acid to be tested wi oil sample that contains 500 ppm ferric iron (Fe3). . No acid or fluid is to be pumped into the production header system. A 250 bbl flowback PTS tank will be used to handle all returns. Procedure 6-4-05 XTQ Energy Inc. .' MGS A34-11LS2 COOK INLET, ALASKA 2 Materials Required: · 10,000 gal (238 bbl) Paravan 25 Preflush · 10,000 gal (238 bbl) Paravan 25 Acid (10% HCL) · 900 bbl3% KCL FIW Water (Friction Reducer Supplied by BJ) > 1 gal/I 000 gal FRW-14 BJ Friction Reducer > 9,000 lbs KCL (1,000 lbs / 100 bbl FIW for 3%) Supplied by MI > Heat water to 100 deg F · N2 bottles to purge reel after job · 4,000 lbs Soda Ash (Supplied by MI) Equipment Required: · BJ 1 %" CTU: Install press gauges on CT, CT annulus and 2-7/8" tbg annulus. · 1 ea HP Triplex Pump · 2 ea Plastic Lined Acid Tanks (Supplied by R&K) · RotoJet Wash Tool · 250 bbl Flowback Tank > Mud Pump to be tied into tank to pump load to A44-11 Disposal Well > Install 2" vent hose on top of tank to vent overboard · Return line w/ choke manifold to 250 bbl Surge Tank & to Production Header > Manifold to contain a sample catcher to monitor fluids pH > Send only "clean" returns to the Production Header > Send live acid and or fluids containing scale or solids to Flowback Tank · Have a H2S monitor @ the Flowback Tank Preflush System to contain these additives: (Tests are complete) · 3 % KCL water · 25 gpt Paravan 25 (water-wetting solvent) · 10 gpt NE-I10W · 1 gpt FRW-14 Friction Reducer · 50 gpt US-40 Solvent Acid System to contain these additives: (Tests are complete) · 10% HCL (Acid to be titrated on location.) · 25 gpt Paravan 25 · 3 gpt NE-II0W · 1 gpt FR W -14 Friction Reducer · 5 gpt CI-27 Corrosion Inhibitor · 50 gpt US-40 Solvent · 7 ppt F200 Iron Reducing Agent · 30 ppt F300 Iron Chelating Agent · 15 gpt AS-16 Anti-sludge Procedure 6-4-05 · ' XTQ Energy Inc. · MGS A34-11LS2 COOK INLET, ALASKA 3 PROCEDURE: 1. SD gas lift. IDA to RU steam lines in pit to heat FIW to 100 deg F. MU 700 bbl3% KCL FIW. 2. MIRU BJ 1.75" Coil tbg unit, riser, BOP's & Injector head. Contact AOGCC 24 hrs prior to BOP test. Press test BOP's to 5,000 psi. Test treating lines to 6,000 psi. Max press is 5,000 psi. Press test return lines to PTS tank to 1,000 psi. MU BJ RotoJet wash nozzle on EOT. CTU operator to ensure all tools to be calipered before RIH. Smallest ID = 2.205" @ XN Nipple @ 8,778'. 3. Hold safety meeting with all service & production personnel about the procedure, corrosive chemicals, and possible H2S exposure. 4. Open WH for circ. RIH wi coil tbg @ 80 fpm down the tbg while pumping @ 1.25 BPM heated slick 3% KCL FIW. Slow tbg rate to 10 fpm while passing 20' over the 10 GLM's (see attached WBD). 5. Cont RIH @ 80 fpm to 9,340'. Slow tbg down to 10 fpm. Wash the perfs wi slick 3% KCL @ 1.25 BPM while taking returns to the PTS tank. Tag PBTD @ 10,698'. PREFLUSH WASH PERFS: 6. Pull up hole while laYing a 21 bbl Paravan 25 Preflush from 10,530 to 9,340'. 7. Pump 210 bbl Paravan 25 PreFlush @ 1.25 BPM while washing the perfs as per schedule: Cumm Pump Rate Tbg Speed Time Step Depth Depth Footage BBL BBL BPM fpm min Comments 1 9340 9400 60 8 8 1.25 10 6 RIH 2 9460 9515 55 7 14 1.25 10 6 *See below 3 9700 9910 210 26 41 1.25 10 21 4 9940 10190 250 31 72 1.25 10 25 5 10245 10430 185 23 95 1.25 10 19 6 10450 10530 80 10 105 1.25 10 8 7 10530 10450 80 10 115 1.25 10 8 Pull up hole 8 10430 10245 185 23 138 1.25 10 19 9 10190 9940 250 31 169 1.25 10 25 10 9910 9700 210 26 196 1.25 10 21 11 9515 9460 55 7 203 1.25 10 6 12 9400 9340 60 8 210 1.25 10 6 168 *RUN TBG @ +/- 75 fpm across blank sections b/w peñs 8. PUH to 9,300'. SD & let preflush soak 1 hour. ACID WASH PERFS: 9. Repeat Step #7 by pumping 210 bbll0% HCL wi Paravan @ 1.25 BPM making the 2 passes across the perfs. Procedure 6-4-05 XTO Energy Inc. ~. MGS A34-11LS2 COOK INLET, ALASKA 4 10. Finish pumping all acid @ 9,340'. Displace acid wi 3% KCL water. PUH to 9,200'. SD & let acid soak for 1 hr. Have soda ash in PTS tank for acid returns. 11. RIH @ 30 fpm wi slick 3% KCL water @ 1.25 BPM to 10,698' PBTD while circ out acid to surface. 12. POOH from 10,698 - 9,300' @ 30 fpm w/slick 3% KCL water @ 1.25 BPM. 13. At 9,300', POOH @ 100 fpm. Reduce pump rate to 1 BPM. (Can omit the KCL.) Close the swab valve. 14. RD CTU. Blow CT dry wi N2 if last well in package. 15. Leave PTS tank rigged up while well is producing acid load or solids. 16. Start up gas lift slowly as to what the PTS tank can handle. Flow load back to PTS tank. Once load is recovered & fluid is acceptable, turn well to the header system and put well in test. Monitor the well for ±3 days taking readings every other hour. Put well back into regular test rotation after 3-4 days. Record any use of the disposal well with fluid type, volume and injection rates & press. Overflush by 125 bbl FIW at end of disposing fluids. <:?_t ¿(. ~ß Paul Figel Engineering Manager Kyle Hammond Vice President Operations, Alaska Procedure 6-4-05 Re: MGS A34-11LS (195-088) and A34-11LS2 (200-089) Subject: Re: MGS A34-11LS (195-088) and A34-11LS2 (200-089) From: Paul_Figel@xtoenergy,com Date: Tue, 07 lun 2005 15:08:15 -0500 To: Thomas Maunder <tom_maunder@admin.state.akus> CC: Bob Fleckenstein <bob_fleckenstein@admin.state.akus>, Steve McMains <steve _ mcmains@admin.state.akus> Tom, I will straighten this out. It was in the drilling records that the A34-11LS was P&A'd but I can only find the Sundry #300-149 submitted on 6-22-00 to P&A wlo finding the follow up 10-407. Sir Charles Pope did a good job keeping all 3 wells mixed together (A34-11, A34-11LS & A34-11LS2) . Took a while figuring out the well history this well. Sorry, but no need to hurry on approving the A34-11LS2 coil tbg job. FTW told me this morning that they want to delay the coil tbg work for a couple months due the expense budget getting out of control. Paul Paul Figel Engineering Manager XTO Energy Inc. Midland, TX Office: 432-620-6743 Mobil: 432-553-5217 Fax: 432-687-0862 Thomas Maunder <tom maunder@admi n.state.ak.us> To 06/07/2005 02:45 PM Paul Figel .:S.P..9..~~.~_f..~..9.~.~S~,~Tq.~.!.?:§:'E9..Y..:...~~9.!~~.?: cc Steve McMains <steve mc¡nains@admin. state. ak. us>, Bob Fleckenstein <bob fleckenste:ì.n@adm:ì.n.state.ak.us .................-......................................................"............................................................................................................. > Subject MGS A34-11LS (195-088) and A34-11LS2 (200-089) Paul, I was reviewing the sundry application to stimulate A34-11LS2. From what I can tell, LS2 was a sidetrack of LS and was completed in late November 2000. In our records, it appears that LS was never P&Aed. I check our LS file and there is no 407 for the work that was done to P&A this penetration. I looked at the LS2 file and the work summary filed there would indicate that the LS was P&Aed. Could you please look into your files and see what you can determine. I suspect that XTO will need to file a 407 for LS so that the correct well status can be entered. Call or message with any questions. 6/7 /2005 1 :22 PM 5/26/2005 4:23 PM 1 of 1 SCANNED JUN 1 ? 2005 iSVS MGS A 5-24-05 BDP.xls Content-Type: applicationlvnd.ms-excel Content-Encoding: base64 Barney Phillips XTO Energy Platform A, MGS, A34-11 LS2 Surface Safety Valve has been replaced and tested. See attached. Gentlemen, XTO Energy - MGS Platform A - A34-11 LS2 SSV Retest ) ) Subject: XTO Energy - MGS Platform A - A34-11 LS2 SSV Retest From: Barney Phillips <Bamey_Phillips@xtoalaska.com> ,', ,',' , " ',.ð,Oq Date: Tue, 24 May 2005 14:52:30 -0800 .. ~,~:t)~......,: V'O To: Bob Fleckenstein <bob_fleckenstein@admin.state.ak.us>, Jim Regg - AOGC :.~.". <jiin_regg@admin.state.ak.us>, John Crisp.. AOGC <john_crisp@admin.state.alcus>, Paul Figel. <pautJigel@xtoenergy.com>, Scott Griffith <Scott_ Griffith@xtoalaska.com>~ "Tom Maun4er <tom__maunder@admin.state.ak.us>, Tom Reese <To1D:_Reese@xtoalaska.com,',>:·· CC:RayPurugganan <Ray ~Purogganarl@xtoalaska.com> ' F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc MICROFilMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE ~-"" z z '~ 0 n u. ( ( STATE OF ALASKA ' ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator Cross Ttabers ~erattn0 Ca~._arl,y 3. Address ~ 210 Park Ave., Ste. 2350, 0KC, 0K7310 Stimulate X Plugging. After casing Repair well 5. Type of Well: Development X Exploratory Stratigraphic. Service, 4. Location of well at surface 1,624' FSL & 430' FEL Sec. 11-8N-13N S.H. At top of productive interval 469' FSL & 2,367' FEL Sec. 11-8N-Z3N S.H. At effective depth At total depth 632' FNL & 2,059' FEL Sec. 14-8N-13N S.H. Perforate Other 6. Datum elevation (DF or KB) RIO] 116' AqL feet 7, Unit or Property name Htddle Ground Shoal 8. Well number A34-11LS2 9. Permit number/approval number 200-089 10. APl number so- 733-10084-03 11. Field/Pool HGS E, F&G 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length 370' 1,644' 10.750 9,657.30 10.698 9,622.6 6,747' 3.930'/1833' measured 9.347' - 10.520' true vertical 8,685.33' - 9,501.18' Tubing (size, grade, and measured depth) 2-718' set 0 8,74g' feet Plugs (measured) feet feet Junk (measured) feet Size Cemented 24' 13-3/8' 1.900 sx 9-5/8" 1,100 sx 7' & 5' 580sx/142sx Measured depth 370' 1,644' 6,747' 9,255/10,740 True vertical depth 370' 1,640.8' 6,335.30' 8620.3419650.63 RECEIVED ,, 20,01 ~...~..."/ ,:,~., Oil & '"'"' ' Packers and SSSV (type and measured depth) Packer set 0 8,820' & SSSV set 0 247' Ar~chorage 13. Stimulation or cement squeeze sui~ary Intervals treated (measured) 9,347' - 10,520' Treatment description including volumes used and final pressure 3,000 gals I~udClean 0a + 1,500 gals x~lene 14. Prior to well operation 77 , Subse=luent to operation 70 15. Attad-,rr, ent~ Copies of Logs and Surveys run .... Daily Report of Well Operations X Representative Daily Avera~le Production or Injection OiI-Bbl Gas-Mcf Water-Bbl . Casing Pressure 142 13 620 88 1 400 Tubing pressure 80 80 16. Status of well classification as: Oil X ~,,= $,_,e~ended .. Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ORIGINAL-,,- Date 05117/01 SUBMIT IN DUPLICATE DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 12/21/00 12/22/00 12/23/00 12/24/00 12/25/00 12/26/00 12/27/00 12/28/00 12/29/00 04/26/01 04/27/01 GL 24 hrs. No Test. Inj 1033 MCF. TP 90#, CP 620#. GL 24 hrs. Test. 86 BO, 4 BW, 155 MCF. Inj 1041 MCF. TP 100#, CP 630#. GL 24 hrs. No Test. Inj 1032 MCF. TP 100#, CP 630#. GL 24 hrs. No Test. Inj 1058 MCF. TP 85#, CP 640#. GL 24 hrs. Test. 86 BO, 4 BW, 157 MCF. Inj 1006 MCF. TP 95#, CP 650#. GL 24 hrs. No Test. Inj 1021 MCF. TP 90#, CP 640#. GL 24 hrs. No Test. Inj 1007 MCF. TP 90#, CP 630#. GL 24 hrs. No Test. Inj 1011 MCF. TP 90#, CP 630#. GL 24 hrs. No Test. Inj 897 MCF. TP 90#, CP 580#. Temporarily Drop Until Further Activity RETURN TO REPORT. Objective: CTU oil base mud clean- out and xylene soak. Date First Report: 09/08/00. RU CTU and pressure test all equipment and lines to 3000#'s. Mix all chemicals and secure well for evening. DCC: $12,800 CCC: $64,820 Hold pre-job safety meeting. RIH with 1-1/2" Coil tubing with rotating jet nozzle (1.69"). Pumped diesel at .25 bpm while running in hole. Stopped at 9300. Tested N2 lines to 3000#'s. Started pumping N2 at 300scf/min and Diesel at .25 bpm. RIH to 10525'. POOH to 9345'. Started pumping xylene at .5 bpm and N2 at 200 scf/min. RIH and washed perfs from 9345' to 10525' POOH to 9345'- while washing perfs. Started pumping DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 04/28/01 04/29/01 04/30/01 05/01/01 05/02/01 MudClean OB at .5 bpm and N2 at 300scf/min. RIH and washed perfs from 9345' to 10525' and POOH to 9345'- while washing perfs. RIH to 10525'. Shut-in well. POOH while pumping .5 bpm of MudClean OB and 250scf/min of N2. Stopped at 9345'. Put well back on production. RIH to 10525' while pumping N2 at 150 scf/min. POOH while pumping N2 at 150 scf/min. Rig down CTU and secure well. Used 3000 gal of MudClean OB and 1500 gal of xylene. DCC: $64,820 CCC: $77,620 GL 6 hrs. TP 80#, CP 570#. Rcv 2.5 to 1.3 BPH 100% wtr cut. Very soapy rtns. DCC: $-0- CCC: $64,820 GL 24 hrs. TP 80#, CP 435#. Rcv 60 BO, 1 BW, 185 MCF. Inject 553 MCF. DCC: $-0- CCC: $64,820 GL 24 hrs. TP 80#, CP 400#. Rcv 70 BO, 1 BW, 88 MCF. Inject 534 MCF. Rcvry 2.8 BPH .1% wtr cut. DCC: $-0- CCC: $64,820 No Test. DCC: $-0- CCC: $64,820 No Test. DCC: $-0- CCC: $64,820 FINAL REPORT ' A{ STATE OF ALASKA ALASK _ .- AND GAS CONSERVATION C~i MISSION WELL COMPLETION OR RECOMPLE.TION REPORT AND LOG 1. Status of Well Classification of Serwce Well OIL ~ GAS [] SUSPENDED ~ ABANDONED ~-' SERVICE 2. Name of Operator Cross Timbers Operating Company 3. Address 210 Park Ave., Ste. 2350, Oklahoma CitS, OK 4. LocatIon of well at surface 73102 7. Permit Numoer 200-089 8. APl Number so- 733-10084-03 9. Unit or Lease Name Middle Ground Shoal 1,624' FSL & 430' FEL Sec. 11-8N-131,'J S ~": ..................... . ,'1 .;' ..".~.I" :.": :S'.: ! I At Top Producing Interval . ~i~OC~iC~_ ! 10. Well Number 469' FSL & 2,367' FEL Sec 11-8N-13W S.H.:.'Z~;:Z' 134-11LS2 / ~TotalDe~th~~'' ~1'~~ 11. Field and Poo, ~~' FNL & FEL Sec 14-8N-13W S.H.~,;.:::. .':-.~,~~ HGS E, F & G 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No~~' RKB 116' ASL I ADL 18756 & 18754 112. Da,eS~a~ed ]13. Da~eT.D. Reache~ 114. Da,eCo~.,S~m. orAba~d. 115. W~e~De~,h,i~o"sho~, 116. No. o' Comple,ions / 09/25/00 I 11/13/00 ~ 12/0~/00 I r 80 feet'MSLTh} kn fP rIfr 110,750'(9,657.30')110,698' (9,622.6'~YES~ NO~ I 247 ,ee, MD ] NA 22. Type Electric or Other Logs Run GR/CBL/CCL; 0B/CBT/GR/CCL; Mu]~p]e P~opaga~on Resistivity, GR RWD 1'600 & 1'240 23. CASING, LINER AND CEMENTING RECORD CASING SIZEIWT. PER FT. 13-3/8" i 54.5 9-5/8" !43.5/47 7" 126.0 GRADE 0-55 N-80 L-80 TOP 0 5,325' SETTING DEPTH MD BOTTOM 0 1,644' 6,747' 9,255' 10,740' 5" i 17.95 L-80 8,907' I' . 24. Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number) 6 JSPF Zone MD HC 9,347 HE 9,465 HK 9,706 HK 9,860 HN 9,950 HR 10,253 HR 10,455 -9,390' -9,508' -9,840' -9,900' -10,180' -10,422' -10,520' TVD 8,685.33 -8 8,766.65 -8 8,933.77 -9 9,040.14 -9 9,103.19 -9 ,715.21 ,795.83 ,026.27 ,067.99 ,264.04 9,315.35 -9,433.64 9,456.43 -9,501.18 27. HOLE SIZE 15" Date First Production 12/02/00 Date of Test 12/15/00 Hours Tested 12 Flow Tubing Casing Pressure Press. 80 620 28. 81.!.II 2 11 CEMENTING RECORD 1900 sx 1100 sx 580 sx 142 sx 25. TUBING RECORD SIZE 2-7/8" AMOUNT PULLED I DEPTH SET (MD) I PACKER SET (MD) 8,749' 18 ,8,,-0' I 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL(MD) I AMOUNT& KIND OF MATERIAL USED 9, '-10,180 10,253.!..~-10,520 PRODUCTION TEST I Method of Operation (Flowing, gas lift, etc.) I Gas Lift PRODUCTION FOR IO,L.,aL GAS-MCF TESTPERIOD * I 38.5 71 CALCULATED J OIL-BBL GAS-MCF 24-HOUR RATE eJ 77 142 CORE DATA 56 bbls Diesel 58 bbls Diesel 50 bbls Diesel PjF4JKiAi. I N, I 1,,.,/ I I 111 II..,,. WATER-BBL CHOKE SIZE GAS-OIL RATIO 6.5 -- 11840 WATER-BBL13 OIL GRAVITY-APl (corr) Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Attached are daily report of operations for recompletion(sidetrack) RECEIVED *Please note Bill Miller to file monthly production reports JAN .0:9 ?q01 OB & Gas Cons. commission Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. NAME HEMLOCK HC HE HI HK HN HR HZ GEOLOGIC MARK,'.',o MEAS. DEPTH !i TRUE VERT. DEPTH 9,327 · 9,465 .9,644 9,706 9,914 ' 10,190 10,592 8,672 8,767 8,890 8,933 9,078 9,271 9,551 30. fORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, anO time of each phase. SUBSEA -8,556 -8,651 -8,774 -8,817 -8,962 -9,155 -9,435 31. LIST OF ATTACHMENTS Daily Report of Operations, Directional Survey 32, I hereby certify that the *oregomg ~s true ano correct to the best of my knowledge Siane Title S,r. Enq.Tech. ' -S"usan I. -'~udduth--CZFO~)~19-3213 Date 01/02/01 INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lances and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' I':ndicate Which elevation is used as reference (where not otherwise shown) for depth measurements given in.othe'r:spaces,on ,this..form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). I.t.em.:'2,3' ..A...'.,l:t.,a.'~h/e~l. ,"sUpplemental records for this well should show the details of any multiple stage cement- ing and 'he location of the cementing tool. Item 27.i Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. ., Item 28: I'f n~) cores taken, indicate "none". Form I 0-407 INTEQ Measured SVY# Depth Tie-In 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O 21 22 23 24 25 26 27 28 29 3O 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 5O 51 52 53 A34-11L$2 MWD (0-10750') Angle Azimuth TVD-RKB TVD deg deg ft Subsea 26.781 5300.51 27.60 5336.09 25.90 5368,24 24.40 5394:49 23.80 5426.44 21,70 5453.19 20.00i 5482.16i 18.70 5509.52 18.40 5599.59 18.20 5685.98 18.30 5776.21 18.10 5865.50 17.801 5952.07 17.80 6045.38 17.60 6127.31 17,40 6216.96 17.40 6309.52 17.20 6399.27 16.90i 6488.181-- 17.40 6578,00 18,50 6666.48 18.90 6753,62 19.00 684O,63 19.10 6924,76 18.20 7017.61 17,70 7106,08 17.80 7194.66 17.50 7282.33 17.50 7372.93 17.10 7463.63 17.20i 7549.63i 16.80i 7639,53 16,50 7669,23 16.30 7699.93 16.50 7761.35 16.90 7805,41 17, 80 7846.46 17.80 7869.31 17.80 7893.11 17.80 7912.15 17.80 7936.91 18,50 7959.72 20.30i 7998,41 21.60i 8023.62 22.80 8055.11 23.70 8089.11 24,50 8114.67 25.90 8139.10 27.70 8166.77i 28.70 8192.33 29.70 8218.52 31.60 8252.93 32.80 8272.39 34.80 8308.12 Alaska State Plane Coordinates X Y N / -S ft ft ft 231499.25 -675.82 231483.64 -685.65 231469.20 -693.29 231457.86 -698.37 231 444.37 -703.37 231433.60 -706.73 231422.85 -709.41 231413.34 -710.97 231383.30 -714.91 231354.88 -718.54 231325.25 -721.78 231296.01 -725.10 ~ 231268.09 -728.35 231238.27 -731.98 231212.27 -735.30 231184.11 -738.38 231155.16 -740.83 231127.25 -742.93 i 231100.02 -744.90 i 231072.32 -746.66 231043.68 -748.21 231014.19 -749.70 230984.33 -751.21 i 230955.29 -752.68 i 230923.96 -754.16 230895.32 -755.85 230867.00 -757.73 230839.12 -759.34 230810.58 -761.23 1230782.38 -763.45 ! 230755.90 -765.85 ~ 230728.64 -769.73 230720.0 -771.76 230711.3 -774.65 230695.3 -783.06 230684.8 -791.23 230675.3 -800.12 230670.2 -805.47: 230665.1 -811,32i 230661.4 -816.22 230656.9 -822.91 230653.4 -829.57 230649.1 -842.50 i 230647.4 -852.04 230646.5 -864.85 230647.1 -879.41 230648.8 -890.66 230651.5 -901.75 230655.6 -915.00i 230660.1 -927.86 i 230664.9 -941.56 230671.8 -960.57 230676.01 -971.99 230684.2 i -994.26 EI-W ft VSect. Plane = 157.58' DLS degll00 ff 2.80i 5.77i 7.11 7.20 5.16 7.76 7.61 7,17 0.57 0.66 0.14 0.34 0.37i 0.34 0.27 0.58 0.34 0.21 0.34 0.58i 1.19 0.43 0.11 0.11 0.93 0.80i 0.34 0.33 0.32 0.44 0.35i 1.58 4.99 4.98 5.60 5.13 3,00 3.69 4.28 4.28 6,58 8.31 10.86 8.84 7.54 7.55 9.06 8.91 6.85 3.63 3.37 4.83 5.26 4.67 Vert. Sec ft INTEQ SVY# 54 55 56 57 58 59 60 6.1 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 Measured Depth A34-11LS2 MWD (0-10750') Angle Azimuth TVD-RKB TVD deg deg ff Subsea 35.70 8331.80i 36.60 8350.37i 37.50 8373.52 38,60 8396.36 39,30 8417.35 40.00 8440.45 41.00 8460.98i 41.80 8489.49 42.80 8519.07 43.20 8542.47 44.10 8567.08 45.40 8665.08 46.00i 8700.00i 46,50 8731.81 47,3O 8764.61 47.20 8803.98 45.4O 8865,47 45.00 8901,41 45.601 8936.58 46,80 8996.10i 47.00 9020.02 45.10 9062.35 45.30 9096.18 45.80 9152.22i 45.701 9215.721 45.40 9278.74 45.10 9345.63 45.40 9377.31 46.10 9409.41 46.30 9448.17 46.70 i 9517.01 46.90 9582.04 47 .'60 9612.59 48.70 9657.30 Alaska State Plane Coordinates X Y N I-S ft ft ft 230690.0=! -1009.84: 230694.81 -1022.43: 230701.0 -1038.62 230707.3 -1055.19 230713.4 -1070.90 230720.2 - 1088.60 230726.7 i -1104.75 230736.1 -1127.83 230746.2 -1152.55 230754.6 -1172.52 230763.6 -1193.97 230801.9 -1282.36 230816.8 -1314.53 230830.9 -1344.27 230845.3 -1375.92 230861.5 -1414.93 230885.2 - 1474.20 230898.5 - 1507.53 230911.7 -1540.22 230935.1 -1597.17 230945.0 - 1620.48 230962.0 - 1660.55 230974.2 - 1692.08 230990.8 - 1746.30 231007.4 -1808.92 231025.0 -1870.31 231043.4 -1934.78 231051.2 -1965.59 231058.7 -1997.48 231067.1 -2036.80 231079.3 -2108.01 231091.2 -2175.94 231097.7 -2208.17 231109.2 -2256.46 EI-W ft, VSect. Plane = 157.58° DLS deg/100 ff 3.10 4.31 3.17 3.85 2.59 2.48 4.07 2.11 2.50 2.47 3.00 1,32 1.98 1.09 3.60 1.91 2.02 0.78 1.33i 1.42 2.36 3.37 4.16 4.68 0.79i 0.93i 0.88 3.85 1.87 4.14 1.o9i 1.32 2,90 2.95 Vert. Sec ft DAILY OPEPJ~TIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 09/08/00 FIRST REPORT. Objective: Drill & Complete 10,530' (9616' Hemlock Sidetrack, Single Tubing Well. Date First Report: 09/08/00. 09/13/00 DFS: 00ART: TIME DIST: 12.00hrs) MIRU, RU SLOP TANK IN LEG #, CLEAN DECKS & DRAINS, HIGH WING, NO CRANE WORK, CLEAR TOP OF WELDING SHOP. (12.00hrs) MIRU, SET WELDING SHOP, LITE WTR TANK & PUMP ROOM, WIRE UP SHOP AND PUMP ROOM. DMC:$-0- CMC:$-0- DWC:$16028 CWC:$16028 09/14/00 DFS: 0 OART: TIME DIST: (24.00hrs) RU ON A34-11LS2. PREP DECKS & TRANSFER, INSTALL 10" FLOW LINE, HOOK UP SERVICE LINES TO RIG, STRING UP EAST CRANE W/ 4 LINES,. LAY OUT & HOOK UP 4" & 6" LINES F/ CHOKE & WTR RETURN LINES. PREPARE DECK F/ BOAT LOAD THIS A.M. DMC:$-0- CMC:$-0- DWC:$34161 CWC:$50189 09/15/00 DFS: 0 OART: TIME DIST:(6.00hrs) GENERAL RIG UP, LAY OUT & INSTALL 4" & 6" CHOKE RETURN LINES (12.00hrs) OFF LOAD BOAT, RU & PULL BTM GLV W/ SLICK LINE, CHECK STEAi~ SYSTEM, HEAT FIW F/ ACID JOB IN PITS & ASSIST BJ IN RIGGING UP F/ACID JOB ON WELL A13-12RD. (6.00hrs) SET BEAVERSLIDE & CAT WALK. DMC:$-0- CMC:$-0- DWC:$17334 CWC:$67522 09/16/00 DFS: 00ART: TIME DIST:(12.00hrs) CREWS WORKED ON ACID JOB ON WELL A13-12. (ll.00hrs) RU CIR LINES FILL ANN, PUMP TBG VOL W/ FIW ON WELL A34-11LS2 - WHILE CONTINUING TO BACK FLOW WELL A13-12RD - CHECKING F/ACID & H2S.(1.00hrs) MONITOR WELL A 34-11LS2 BEFORE SETTING BPV AND N/D TREE. DMC:$-0- CMC:$-0- DWC:$12832 CWC:$80354 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING 0: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 09/17/00 DFS: 1 OART: TIME DIST: (5.00hrs) SET BPV & ND TREE, MU LANDING JT & PULL TREE (WHILE RD BJ F/A 13-12RD & R/U TO PUMP FLUID F/SLOP TANK TO INJECTION WELL). (7.00hrs) NU BOP, FLOW LINE, TRIP TANK LINE, CHOKE LINE, FAB KILL LINE, INSTALL POLLUTION PANS. (5.00hrs) SET VARCO GEN & VFD HOUSE, RU TOP DRIVE ELECTRIC LINES, SPOT BJ & ASSIST IN INJECTION WORK. (5.00hrs) PULL BPV, INSTALL 2-WAY CHECK, RU TEST ASSEMBLY, TEST HYDRIL 250 & 2500 PSI & 250 & 5000 PSI ON STACK & CHOKE LINES, TEST ACCUMULATOR & GAS ALARMS. (2.00hrs) RD TEST ASSEMBLY, PLUMBING, ORGANIZING DECKS, REPAIRING FLOW LINE & PREPARING TO PULL TBG. DMC: $-0- CMC: $-0- DWC: $20358 CWC: $100712 09/18/00 DFS: 2 OART: TIME DIST: (0.50hrs) PREPARE TO PULL TBG. (3.00hrs) PULL 2-WAY CK, ATTEMPT TO PULL TBG HANGER, MU 2 DC'S JARS & BUMPER SUB, JAR HANGER FREE, PULL 65K OVER TO RELEASE PKR, PULL HANGER ABOVE ROTARY. (3.00hrs) CIR BTM UP PLUS TBG VOLUME THRU GAS BUSTER. (0.50hrs) MONITOR WELL, HOLE TAKING 7 TO 8 BBLS PER HR. (9.50hrs) PULL & LAY DN 2 7/8" 6.59 8RD EUE TBG, CHECKING F/ NORM. (1.00hrs) RD TONGS, CLEAR FLOOR. (1.50hrs) CHANGE RAMS TO 3 1/2". (1.00hrs) BOP BODY TEST 250/5000 PSI & 3 ~ RAMS 250/5000 PSI, SET WEAR BUSHING. (3.00hrs) UNLOAD SUPPLY BOAT. (1.00hrs) PU 5" CSG SCRAPER, PREPARE TO PU 2 7/8 PAC. WORK STRING & 3 ~ DRLG PIPE. WELL HAS TAKEN 177BBLS LAST 24 HRS. 09/19/00 DFS: 30ART: TIME DIST: (2.50hrs) RIH W/ 5" CSG SCRAPER, PICKING UP 2 7/8" PAC DRLG PIPE. (12.00hrs) PU 3 1/2" DRLG PIPE, RIH TO 9388', WASH THRU TIGHT SPOTS @ 8062' - 8075', 8308' - 8462'. (3.00hrs) PUMP 20 BBL HI- VIS SWEEP, CIRC BTMS UP (BACK LOAD BOAT). (4.50hrs) POH W/ 5" CSG SCRAPER. (2.00hrs)RIH W/ 5" BAKER CEMENT DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION. MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR- OPERATOR: CROSS TIMBERS OPERATING COMPANY RETAINER. HOLE HAS TAKEN A TOTAL OF 241 BBLS OF FLUID. DMC:$-0- CMC:$-0- DWC:$41824 CWC:$170114 09/20/00 DFS: 4 OART: TIME DIST: (3.50hrs) RIH W/ BAKER 5" CEMENT RETAINER. (16.50hfs) AT RETAINER SETTING POINT, CHANGED OUT 2 HEADS ON TOP DRIVE 398 CAT BEFORE PUMPING CEMENT, ALSO UNLOADED BOAT OF 5" DP, MUD LOGGING UNIT & DIA TOOLS. (2.00hrs) SET RETAINER, UNSTING, CIRC DP VOLUME, HOLD PRE JOB SAFETY MTG, RU BJ. (0.50hrs) PRESSURE TEST LINES TO 6000 PSI, STING INTO RETAINER ESTABLISH INJECTION RATE OF 3 BPM @ 3500 PSI. (1.25hrs) PUMP 15 BBL FI W PRE-FLUSH, FOLLOW W/ 18.49 BBL (91 SACKS CLASS G CMT, .05% BWOC R-l, .3% BWOC CD-32, .6 BWOC FL-33, 1 GAL/100 SX FP-6L, 43.7% FRESH WTR. DISPLACE W/ 57 BBL FW. PULL OUT OF RETAINER & LAY 2 BBL ON TOP OF RETAINER, CMT IN PLACE @ 5:45 A.M. (0.25hrs) PULL 4 STDS DP, REVERSE CIRC BTMS UP. DMC:$-0- CMC:$-0- DWC:$30674 CWC:$200788 09/21/00 DFS: 5 OA_RT: TIME DIST: (1.00hrs) REV. CIR BTMS UP. (4.00hrs) POOH W/ BAKER 5" RETAINER STINGER. (1.00hrs) M/U 4 1/8" MILL TOOTH BIT TO TAG CMT. (3.50hrs) BLEW DIODES IN 125 VOLT DC CONTROL RECTIFIER - REPAIRED SAME. (4.50hrs) RIH TAG HARD CMT @ 9242, HELD 15000 WT. (1.50hrs) MIX & PUMp 25 BBL OF 50 VIS 9.3 PPG SPACER (FILL F/ TOP OF CMT TO 7950' W/WEIGHTED MUD). (4.50hrs) POOH. (1.00hrs) LD 2 7/8" PAC DP & 4 1/8 BIT. (3.00hrs) M/U & RIH W/ BAKER 5" CMT RETAINER TO BE SET AT 8120'. DMC: $-0- CMC: $-0- DWC:$62479 CWC: $263267 09/22/00 DFS: 6 OART: TIME DIST: (0.50hrs) RIH W BAKER 5" CMT RETAINER & SET @ 8120' (45' IN 5" LINER). (1.00hrs) PULL OUT OF RETAINER, CIR DRLG PIPE VOLUME & HELD PRE JOB SAFETY MTG. (lo25hrs) R/U BJ - PRESSURE TEST LINES TO 4000 PSI PUMP 5 BBL FRESH WTR - MIX & PUMp 31 BBL OF DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGSA34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY CLASS G CMT MIXED AS: 150 SACKS CLASS G CMT +0.05% BWOC R-1 + 0.3% BWOC CD-32 + 0.6% BWOC FL-33 + 1 GAL/100 SX FP-6L + 43.7% FRESH WTR - FOLLOWED BY 9 BBL FRESH WTR & DISPLACED W/ 36 BBL FIW. (0.25hrs) POH 10 STDS. (0.50hrs) REV CIR DRLG PIPE VOLUME & INSTALL BELL GUIDE ON TOP DRIVE. (4.00hrs) POH (0.50hrs) L/D BAKER 5" RETAINER STINGER & P/U 6" JUNK BIT TO TAG CMT. (3.00hrs) RIH. (2.00hrs) BUILD 90 BBL OF MUD & BREAK CIR. (0.50hrs) TAG CMT @ 7219' - HELD 15000 ~ WT. (8.50hrs) PUMP 85 BBL OF 47 VIS 9.3 WT MUD- POH LAYING DN 3 1/2 DRLG PIPE. (2.00hrs) CLEAR FLOOR & DECK OF 3 1/2 TOOLS - PREPARE TO DMC: $5424 CMC: $5424 DWC:$47002 CWC:$310269 09/23/00 DFS: 7 OART: MW: 8.5 CL:16000 CA TIME DIST:(2.00hrs) CHANGE RAMS & BODY TST SAME 250/5000 PSI - INSTALL WEAR RING. (1.00hrs) P/U 5" DP & RIH. (1.50hrs) INSTALL BLOCK HEIGHT INDICATOR FOR BAKER INTEQ EPOCH. (5.00hrs) P/U 5" DP & RIH. (1.50hrs) POOH & STD/BK 5" DP. (2.00hrs) CHANGE/OUT SAVER SUB. (3.50hr$) ALIGN T/DRIVE TRACK & REPAIR HYD HOSE. (4.00hrs) P/U 9 5/8" SCRAPER BHA & RIH. (3.50hrs) P/U 5" DP & RIH. DMC:$600 CMC:$6024 DWC:$23,707 CWC:$333976 09/24/00 DFS: 80ART: MW: 8.5 CL:16000 CA: TIME DIST: (3.00hrs) P/U 5" DP & RIH. (3.00hrs) INJECT WASTE MUD & CLEAN PITS. (12.00hrs) CLEAN PITS, LOAD & UNLOAD BOAT. (6.00hrs) CLEAN PITS & INJECT WASTE FLUIDS. DMC:$650 CMC:$6674 DWC:$31775 CWC:$36575I 09/25/00 DFS: 90ART: MW: 9.0 VISC:61 PV: 13 YP: 28 GELS: 14/:18 PH: 9.0 WL: 8.0 CL:16000 CA:200 TIME DIST: (6.00hrs) CLEAN PITS, MIX & BUILD MUD VOLUME. (2.00hrs) CONDITION MUD. (4.50hrs) DISPLACE HOLE VOLUME WITH NEW MUD & INJECT OLD. (0.50hrs) CHASE INJECTED MUD W/150 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY BBLS H20. (1.00hrs) MIX & PUMP DRY JOBS. (4.00hrs) POOH & LY/DN 9 5/8" SCRAPER ASS'BLY. (1.00hrs) R/U APRS WL UNIT & HOLD SAFETY MTNG, RADIO SILENCE. (3.00hrs) RIH & LOCATE CSG COLLAR @ 5680' & SET BP @ 5682' WLM.(0.50hrs) POOH.(0.50hrs) R/DN APRS WL UNIT. (1.00hrs) RU W/ TEST ASS'BLY & TEST BOPE. DMC:$14712 CMC:$21386 DWC:$42393 CWC:$408143 09/26/00 DFS: 10 OART: MW: 9.0 VISC:61 PV: 13 YP: 28 GELS: 14/: 18 PH: 9.0 WL: 8.0 CL:16000 CA:200 TIME DIST. (8.50hrs) TEST BOP, HAVE TO CHANGE HCR AROUND. (1.00hrs) PULL TST PLUG, SET WEAR RING & BRK DN TST TOOLS. (1.00hrs) STRING UP GEOLOGRAPH LINE. (0.50hrs) SERVICE RIG. (2.00hrs) TROUBLE SHOOT RIG DC POWER ELECT SYSTEM. (3.00hrs) PU & MU WHIPSTOCK ASSEMBLY, ORIENT & SURFACE TEST. (5.00hrs) RIH SLOW 120 SEC/PER STD. (1.00hrs) ORIENT 25 DEG LEFT TO 55 DEG RIGHT. (1.75hrs) REPAIR PLUGGED FLOW LINE. (0.25hrs) ORIENT FROM 55 DEG RIGHT TO 53 DEG RIGHT (OF HI SIDE). DMC:$864 CMC:$22250 DWC:$62009 CWC:$470152 09/27/00 DFS: 110ART: DFS: OART: MD: 5674 MW: 9.0 VISC:61 PV: 13 YP: 28 GELS: 14/: 18 PH: 9.0 WL:8.0 CL:16000 CA:200 TIME DIST: (0o50hrs) ORIENT WHPSTOCK TO 45 ~G RIGHT OF HI-SIDE, RIH & TAG BP @ 5670' DPM, SET WHIPSTOCK. (13.50hrs) MILL OUT WINDOW FROM 5657' TO ~ 5674' DPM. (1.50hrs) CIRCULATE & SWEEP HOLE CLEAN . (0.50hrs) POOH INTO CASING TO 5650'. (1.00hrs) CUT & SLIP DRILLING LINE. (0.50hrs) PUMP DRY JOB. (1.00hrs)REPAIR HOSE ON T/ DRIVE. (2.00hrs) POOH. (3.00hrs) LD STEEL DRILL COLLARS. (0.50hrs) HANDLE & LD WINDOW MILL ASSEMBLY° DMC:$9182 CMC:$31432 DWC:$39897 CWC:$ 510049 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 09/28/00 DFS: 12 OART: MD: 5674 MW: 9.0 VISC:35 PV: 7 YP: 3 GELS: 2/: 4 PH: 9.1WL: 6.2 CL:16000 CA:200 SOL: 2.3 TIME DIST: (1.50hrs) HANDLE & LD WINDOW MILL ASSEMBLY, TOP WATERMELON MILL 1/8+" OUT OF GUAGE, DECISION MADE TO MAKE 1) MORE MILL RUN, CHG OUT TOP MILL & STARTER MILL. (2.00hrs) RIH TO 5610'. (1.50hrs) CIRCULATE BTM UP. (0.50hrs) REAM F/5647' TO 5674' DPM. (2.00hrs) MILL F/ 5674' TO 5677' DPM. (1.00hrs) CIRCULATE SWEEP. (1.00hrs) TROUBLE SHOOT PUMP ELECT. (1.00hrs) FINISH CIRC SWEEP & DRI JOB. (2.50hrs) POOH F/ DRILL BHA. (1.00hrs) ADJUST KELLEY HOSE & REMOVE DUE TO HI WINDS. (1.00hrs) FINISH POOH & LD MILL ASSEMBLY. (3.00hrs) PU & MU BHA #2 (1ST DRILLING ASSEMBLY). (3.50hrs)TROUBLE SHOOT MWD, CHG OUT RESISTIVITY TOOL TOP SUB, PROGRAM MWD, TROUBLE SHOOT MWD PROGRAMING ELECTRICAL PROBLEM. (2.50hrs) TROUBLE SHOOT DC ELECT PROBLEM TO RIG MUD , PUMPS, BURNED OUT CONTACT, CHG OUT SAME. DMC:$1713 CMC:$33145 DWC:$117621 CWC:$627671 09/29/00 DFS: 13 OART: MD: 5677 MW: 8.9 VISC:44 PV: 7 YP:18 GELS: 4/: 6 PH: 8.9 WL: 6.0 CL:16000 CA:200 SOL: 2.3 TIME DIST: (7.00hrs) TROUBLE SHOOT RIG DC ELECTRICAL PROBLEMS. REPLACE CONTROL CABLE PLUG. TROUBLE SHOOT #2 MUD PUMP ELECTRICAL, SIGNALS JUST NOT GETTING FROM RIG CONSOLE TO PUMP ROOM PANELS. (3.00hrs) PULL MWD PROBE & REPLACE, MU BIT TO DRAIN MOTOR & BRK OUT SAME, MU MONEL & SURFACE TEST MWD, MU BIT. (5.50hrs) SD DC MOTORS & TROUBLE SHOOT ELECTRICAL, UNABLE TO OBTAIN SIGNAL & POWER TO PUMP ROOM. (2.50hrs) MU MONELS, HWDP & JAi{, RIH. (2.50hrs) REPAIR CONTROL CABLE PLUG. (1.00hrs) RIH TO 5 615' DPM. (1.00hrs) TROUBLE SHOOT T/DRIVE, TRIPPING BREAKERS. (0.50hrs) RIH THRU WINDOW SLOWLY, WHIPSTOCK WINDOW GOOD. (1.00hrs) CIRCULATE BTMS UP. DMC:$1119 CMC:$34264 DWC:$44490 CWC:$672161 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AI< CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 09/30/00 DFS: 14 OART: MD: 5831 MADE: 154 MW: 9.2 VISC:38 PV: 8 YP: 6 GELS: 3/: 3 PH: 9.3 WL: 6.0 CL:16000 CA:200 SOL: 2.3 WOB: 5 RPM: 163 TIME .DIST: (0.50hrs) CIRCULATE MUD. (3.25hrs) DRILL SLIDE FRM/ 5677' TO 5723', DRILL 7' COAL, NO PROBLEM. (0.25hrs) ROTARY DRILL FRM/ 5723' TO 5728'. (3.75hrs) DRILL SLIDE FRM/ 5728' TO 5753'. (1.00hrs) ROTARY DRILL FRM/5753' TO 5788'. (1.00hrs) PU OFF BTM, WHILE REPAIR BACKED UP MUD AUGER. (0.75hrs) POOH INSIDE CSG TO 5620'. (6.50hrs) GEN SKID #1 CAME UNCOUPLED, SEPAllATE TO RUN, INSTALL NEW CONTROL LOOP ON TOP /DRIVE & READY J-TUBE FOR DUMPING CUTTINGS. (1.00hrs) RIH TO 5788' & BRK CIRC. (0.50hrs) CIRCULATE MUD. (5.50hfs) DRILL SLIDE FRM/ 5788' TO 5831', DRILL 15' COAL @ 20'/HR, PICKED UP & REAMED NUMEROUS TIMES, NO PROBLEM. DMC:$2336 CMC:$36600 DWC:$43980 CWC:$716141 10/01/00 DFS: 15 OART: MD: 6310 MADE: 479 MW: 0.0 VISC: 0 PV: 0 YP:0 GELS: 0/: 0 PH: 0o0 WL: 0.0 CL: 0 CA: 0 SOL: 0.0 WOB:5 RPM: 259 TIME DIST: (9.25hrs) DRILL SLIDE / ORIENT FRM/ 5831' TO 5884' W/ TF'S OF 140,135, & 110 R . (7.75hrs) DRILLING / ROTARY F/ 5884' TO 6124'. (1.00hrs) CIRCULATE FOR SHORT WIPER TRIP. (1.00hrs) WIPER TRIP / SHORT TRIP TO 5685', SMOOTH. (5.00hrs) DRILLING W/ ROTARY F/ 6124' TO 6310. DMC:$7698 CMC:$44298 DWC:$87712 CWC:$803853 10/02/00 DFS: 16 OART: MD: 6815 MADE: 505 MW: 9.3 VISC:46 PV: 15 YP: 12 GELS: 4/:5 PH: 9.5 WL: 5.8 CL:12000 CA:200 SOL: 5.4 WOB: 10 RPM: 237 TIME DIST: (12.75hrs) DRILLING /W/ROTARY F/ 6310' TO 6606'. (1.25hrs) DRILL SLIDE / ORIENTATE FRM / 6606; TO 6621' W/ TF OF 90 DEG DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY R. (1.50hrs) CIRC & WIPER TRIP / SHORT TRIP TO 5640'. (0.50hrs) SERVICE RIG & TOP DRIVE. (0.50hrs) WIPER TRIP / SHORT TRIP TO 6621'. (7.50hrs) DRILLING/W/ROTARY F/ 6621' TO 6815'. DMC:$7698 CMC:$51996 DWC:$63372 CWC:$867225 10/03/00 DFS: 17 OART: MD: 7150 MADE: 335 MW: 9.2 VISC: 44 PV: 12 YP: 10 GELS: 4/:5 PH: 9.3 WL: 6.5 CL:13000 CA:200 SOL: 5.4 WOB: 12 RPM: 100 TIME DIST: (9.50hrs) DRILLING /W/ROTARY FRM 6815' TO 6980'. (2.25hrs) DRILL SLIDE / ORIENTATE F/ 6980' TO 6985' W/ TF OF 25 DEG R. (4.50hrs) DRILLING / W/ ROTARY F/ 6985' TO 7013' . (0.75hrs) DRILL SLIDE /ORIENTATE F/ 7013' TO 7024' W/ TF OF 10 DEG R. (0.50hrs) DRILLING W/ROTARY TO WORK THRU COAL F/ 7024' TO 7031'. (1.00hrs) DRILL SLIDE /ORIENTATE F/ 7031' TO 7040' W/ TF OF 10 DEG R.(5.50hrs) DRILLING /W/ROTARY FRM/ 7040' TO 7150'. NOTE: HAD TO WORK THRU COAL @ 7024'. DMC:$7665 CMC:$59661 DWC:$59287 CWC:$926512 10/04/00 DFS: 18 OART: MD: 7247 MADE: 97 MW: 9.3 VISC:45 PV: 15 YP: 12 GELS: 4/:5 PH: 9.1WL: 6.2 CL:13000 CA:200 SOL: 6.0 WOB: 10 RPM: 80 TIME DIST:(4.50hrs)DRILLING / W / ROTARY F/ 7150' TO 7247'. (1.50hrs) SURVEY & CIRCULATE BTM / UP +. (4.50hrs) POOH, VERY SMOOTH, GOOD HOLE, TRIP FOR BIT. (2.50hrs) PU / LD BHA & TOOLS & DOWN / LOAD LOGGING TOOL RETRIEVE MWD PROBE. (5.00hfs) PERFORM WEEKLY BOPE TEST 250 / 5000 PSI, ANN = 250 / 2500 PSI, GOOD TEST. (4.50hrs) PU & MU BHA #4 & BIT #2. (1.50hrs) RIH. DMC:$3722 CMC:$63384 DWC:$82363 CWC:$1008875 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10/05/00 DFS: 19 OAi{T: MD: 7640 MADE: 393 MW: 9.4 VISC:44 PV: 11 YP: 13 GELS:4/: 5 PH: 9.3 WL:6.6 CL:13500 CA:200 SOL: 6°0 WOB: 15 RPM: 90. TIME DIST:(1.50hrs) RIH & TAG @ 7061' (2 STDS F /TD). (0.50hrs) WASH /REAM F/ 7061' TO 7247'. (1.50hrs) CIRC THICK MUD BTM / UP,- MAX TRIP GAS - 340 UNITS. '(7.50hrs) DRILLING / W / ROTARY F /7247' TO 7459'. (1.25hrs) DRILL SLIDE / ORIENTATE F / 7459' TO 7469' W / TF OF 170 DEG R. (ll.75hrs) DRILLING /W /ROTARY F / 7469' TO 7640'. DMC:$6835 CMC:$70219 DWC:$49872 CWC:$1058748 10/06/00 DFS: 20 OART: MD: 8026 MADE: 386 MW: 9.7 VISC:56 PV: 24 YP: 22 GELS:8/:13 PH: 9.3 WL: 6°2 CL:14000 CA:120 SOL: 8.5 WOB: 15 RPM: 90. TIME DIST: (1.50hrs) DRILLING /W/ROTARY F/ 7640' TO 7653'. (1.00hrs) TROUBLE /SHOOT TOP / DRIVE - BLOWER PROBLEM. (6.00hrs) DRILLING / W / ROTARY F/ 7653' TO 7798' - WORK / THRU COAL FRM/ 7656' TO 7668'. (1.00hrs)CIRCULATE BTM/UP. (1.00hrs) WIPER TRIP / SHORT TRIP F/ 7798' TO 7153', TIGHT @ 7683'. (0.50hrs) SERVICE TOP / DRIVE, BOP DRILL. (0.50hrs)RIH TO 7671'. (0.50hrs) WASH /REAM F/7671' TO 7798'. (12o00hrs) DRILLING /W/ROTARY F/ 7798' TO 8026'. DMC:$12795 CMC:$83014 DWC:$60061 CWC:$1118809 10/07/00 DFS: 21 OART: MD: 8184 MADE: 158 MW: 9.8 VISC:60 PV: 25 YP: 24 GELS: 7/: 13 PH: 9.6 WL: 5.8 CL:15000 CA:100 SOL: 8.5 WOB: 15 RPM: 80 TIME DIST: (3.00hrs) DRILLING W/ ROTARY T/ 8100'. WORK THRU COAL @ 7979'. (1.50hrs) SURVEY, SPR,- RESTART %2 MTR. (3.00hrs) DRILL SLIDE F/ 8100' - T/ 8121'. (1.25hrs) DRILLING W/ ROTARY T/ 8129'. (3.50hrs) DRILL SLIDE T/8153'. (0.50hfs) DRILLING W/ ROTARY T/ 8161'. (2.00hrs) DRILL SLIDE T/ 8175'. (0.25hrs) DRILLING W/ ROTARY T/8184. (1.00hrs) CIRCULATE & SURVEY. (2.00hrs) SHORT TRIP, WIPE HOLE F/ 8184' TO 5657', WORK THRU TIGHT SPOT @ 7811'. (4.50hrs) DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY SERVICE RIG. CLEAN OUT POLLUTION PANS, CLEAN OUT FLOW LINE, SERVICE RIG & TOP DRIVE. '(lo50hrs) TRIP IN HOLE, TAG @ 7784' , REAM THRU TIGHT SPOT @ 8020'. DMC:$6688 CMC:$89702 DWC:$51451 CWC:$1170260 10/08/00 DFS: 22 OART: MD: 8248 MADE: 64 MW: 9.8 VISC:60 PV: 25 YP: 24 GELS: 7/: 13 PH: 9.6 WL: 5.8 CL:15000 CA:100 SOL: 8.5 TIME DIST: (1.00hrs) FINISH WIPER TRIP. WASH F/ 8091' - 8184'o (lo00hrs) CIR BTMS UP, TRIP GAS & THICK MUD. (3.00hrs) DRILL SLIDE F/ 8184' - 8206'° (0.50hfs) DRILLING W/ ROTARY F/ 8206' - 8214'. (1.75hrs) DRILL SLIDE F/ 8214' - 8221'. (2.75hrs) DRILL SLIDE F/ 8221 - 8228' W/ 1 PUMP, INSTALL HEAD & LINER IN OTHER PUMP. (1.50hrs) DRILL SLIDE F/ 8228' - 8238' W/ 2 PUMPS. (0.75hrs) DRILLING W/ ROTARY F/ 8238' - 8246'. (1.25hrs) DRILL SLIDE F/ 8246' - T8248'. (0.50hrs) CIRCULATE & PUMP DRY JOB. (5.00hrs) TRIP F/ BIT. (5.00hrs) DN LOAD MWD, LD STAB, MUD MTR & BIT. PU NEW MUD MTR & BIT, NEW BATT PACK IN MWD, PROGRAM MWD. DMC:$3106 CMC:$92808 DWC:$70576 CWC:$1240836 10/09/00 DFS: 23 OART: MD: 8264 MADE: 14 MW :9.8 VISC:64 PV: 23 YP: 22 GELS: 8/:12 PH: 9.2 WL: 4.8 CL:15000 CA:160 SOL: 8.0 WOB: 20 TIME DIST: (0.50hrs) FINISH PICKING UP BHA. (1.50hrs) TRIP IN HOLE TO T/ 5645'. (1.00hrs) SLIP & CUT 100' DRILL LINE. (0.50hrs) SERVICE RIG & TOP DRIVE. (1.50hrs) TRIP IN HOLE T/ 8180'. (2.00hfs) CIRCULATE OUT GAS CUT & THICK MUD, PREPARE TO SLIDE. (1.50hrs) DRILL SLIDE F/ 8248' TO 8262', DRILL 2' OF COAL, ATTEMPT TO PICK UP, STUCK ON BTM. (12.50hrs) WORK STUCK PIPE & TREAT MUD. (1.00hrs) PIPE FREE, CIR & ATTEMPT TO SURVEY, NO PULSE F/ MWD TOOL. (2.00hrs) PUMP DRY JOB & POH TO CK TOOLS. DMC:$1906 CMC:$94714 DWC:$63280 CWC:$1304116 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10/10/00 DFS: 24 OA_RT: MD : 8327 MADE: 65 MW: 9.8 VISC:63 PV: 23 YP: 22 GELS: 8/: 12 PH: 9.2 WL: 4.8 CL:15000 CA:160 SOL: 8.0 WOB: 20 RPM: 80 TIME DIST:(2.00hrs) FINISH TRIP OUT OF HOLE. (7.00hrs) L/D JARS, MTR, DN LOAD MWD, CHANGE OUT MWD PROBE, P/U ACCL JARS, NEW MTR & ADJUST TO 1.4DEG. (1.00hrs) CLEAN FLOW LINE.(2.50hrs) RIH. (1.00hrs) WASH F/ 8153' - 8262'. (0.25hrs) DRILLING W/ ROTARY F/ 8262' - 8264'. (1.00hrs) CIR BOTTOMS UP THRU GAS BUSTER (THICK GAS CUT MUD)(9.25hrs) DRLG & SLIDE DRILLING TO 8327' - SLIDE (F/ 8268' - 8287') (F/ 8297' - 8319') . DMC:$1906 CMC:$96620 DWC:$44687 CWC:$1348803 10/11/00 DFS: 25 OART: MD: 8342 MADE:15 FMN:COAL MW : 9.9 VISC:64 PV: 23 YP: 24 GELS: 8/: 11 PH: 9.3 WL: 5.6 CL:14000 CA:160 WOB: 25 TIME DIST:(2.50hrs) DRILL SLIDE F/ 3227' - 8342'. (21.50hrs) WORK JAR STUCK PIPE. DMC:$7814 CMC:$104434 DWC:$53236 CWC:$1402039 10/12/00 DFS: 26 OART:POH F/ FISHING STRING MD: 8342 MADE: 0 FMN:COAL MW : 9.8 VISC:60 PV: 20 YP: 22 GELS: 7/:10 PH: 9.7 WL: 5.2 CL:15000 CA:100 SOL: 8.0. TIME DST:(7.50hrs) WORK JAR, STUCK PIPE. (2.00hrs) RU DOUBLE D TONGS & LD 5" DP ABOVE ROTARY. (2.50hrs) RU ALASKA PIPE RECOVERY (APRS).(4.00hrs) RIH W/ COLLAR LOCATOR & STRING SHOT, FAILED TO FIRE, POH. (0.50hrs) REHEAD STRING SHOT. (4.50hrs) RIH W/ SAME, ATTEMPT TO BACK OFF TOP MONEL DC @ 8220', DID NOT SEE ANY INDICATION OF BACK OFF, POH, RIH W/ ANOTHER STRING SHOT, ATTEMPT TO WORK IN MORE LEFT HAND TORQUE, PIPE BACKED OFF. (1.00hrs) POH W/ STRING SHOT & RD E-LINE . (2.00hrs) CIR BTM UP, PUMP DRY JOB, PREPARE TO POH. DMC:$1301 CMC:$105734 DWC:$54557 CWC:$1456596 --Iq- DAILY OPEPJkTIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10/13/00 DFS: 27 OART: WORK & JAR STUCK PIPE MD: 8342 MADE: 0 FMN:COAL MW: 9.8 VISC:62 PV: 15 YP: 20 GELS: 6/:8 PH: 9.0 WL: 5.8 CL:14000 CA:200 SOL: 8.0 TIME DIST: (6.00hrs) POH W/ DP AFTER BACK OFF, LEAVING 1 MONEL DC, NON-MAG X/O, MWD, NON-MAG X/O,MWD LEAD COLLAR, NON MAG X/O, RESISTIVITY TOOL(MPR), MUD MTR, BIT # 3RR. LD ACCL, DAILEY JARS & 1MONEL. (5.50hrs) TEST BOPS, CHOKE MANIFOLD & GAS ALARMS, BLAIR WONDZELL WAIVED AOGCC WITNESS. (1.00hrs) SERVICE RIG & TOP DRIVE STRAP FISHING BHA. (2.00hrs) PU 6 1/4 DC'S & RUN HWDP. (1.50hrs) RIH. (1.00hrs) SLIP & CUT DRILL LINE.(1.50hrs) RIH. (1.50hrs) WASH TO TOP OF FISH @ 8221', CIRC & WORK STUCK PIPE. (4.00hrs) WORK JAR FISH, PUMP 20 BBL SWEEP (13 PPG, 150 VIS, 1/2 BBL LUBETEX), PUMP 2ND 20 BBL SWEEP(13 PPG, 300 VIS, 1/2 BBL LUBETEX) WHILE WORKING & JARRING FISH. DMC:$1043 CMC:$106778 DWC:$39331 CWC:$1495927 10/14/00 DFS: 28 OART:RIG UP APRS TO BACK-OFF MD: 8342 MADE: 0 FMN:COAL MW: 9.7 VISC:57 PV: 20 YP: 20 GELS: 8/:9 PH: 9.6 WL: 4.8 CL:16000 CA:160 SOL: 8.0 TIME DIST: (23.50hrs) WORK / JAR FISH. (0.50hrs) RU APRS TO RUN BACK-OFF. DMC:$6768 CMC:$113546 DWC:$53438 CWC:$1549365 10/15/00 DFS: 29 OART:WASHING OVER FISH @ 8311 MD: 8342 MADE: 0 FMN:COAL MW: 9.8 VISC:64 PV: 18 YP: 19 GELS: 5/: 7 PH: 9.4 WL: 4.8 CL:15000 CA:160 SOL: 8.0 TIME DIST: (3.50hrs) RIH W/ COLLAR LOCATOR & STRING SHOT, BACK OFF TOF @ SCREW IN SUB, POH W/ E-LINE & RD APRS. (2.50hrs) POH W/ FISHING STRING. (0.50hrs) SERVICE RIG, TOP DRIVE & IRON RUFNECK. (1.00hrs) FINISH POH W/FISHING STRING. (3.50hrs) LD JARS & INTENSIFIER, PU DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY BURING SHOE, 5JTS WASH PIPE, JARS & INTENSIFIER. (9.50hrs) RIH (SLOW) W/ WASH PIPE WASH & REAM TIGHT SPOTS @ (7661'-7665') (7703'-7796') & (7890'-7985'). (3.50hfs) WASH/REAM OVER FISH F/ 8218' TO 8311'. DMC:$1666 CMC:$115212 DWC:$45317 CWC:$1594682 10/16/00 ' DFS: 30 OART:LAYING DN FISH MD: 8342 MADE: 0 FMN:COAL MW: 9.9 VISC:65 PV: 17 YP: 19 GELS: 6/: 8 PH: 9.5 WL: 5.4 CL:16000 CA:160 SOL: 8.0 TIME DIST: (4.00hrs) WASH/REAM OVER FISH W/ 8 1/8" WASH PIPE TO THE STAB ON MUD MTR @ 8335'. (3.00hrs) CIRC, PUMP HI VIS SWEEP, SPOT A WEIGHTED HI VIS PILL W/ 10PPB SOLTEX, 50YP & 5% LUBTEX. (3.00hrs) POH W/ BURNING SHOE & WASH PIPE. (2.00hrs) LD WASH PIPE. (1.00hrs) PU SCREW IN SUB & JARRING ASSEMBLY. (2.00hrs) RIH. (1.00hrs) SCREW INTO FISH, WORK / JAR FISH FREE. (0.50hrs) POH 5 STDS. (2.00hrs) CIR BTMS UP, RD WIRE LINE PUMP DRY JOB. (5.00hrs) POH, DRAG IN OPEN HOLE & THROUGH WINDOW. (0.50hrs) LD BHA & FISH. DMC: $4033 CMC: $119,244 DWC: $62,873 CWC: $1,657,555 10/17/00 DFS: 31 OART:REAMING TO BTM MD: 8342 FLADE:0 FMN:COAL MW: 9.9 VISC:80 PV: 21YP: 22 GELS: 8/:10 PH: 9.2 WL: 5.6 CL:16000 CA:160 SOL: 8.0 TIME DIST: (2.50hrs) L/D FISH - UNLOAD MWD & CLEAR FLOOR. (0.50hrs) RIH W/ 6 1/4" DC'S. (0.50hrs) SERVICE RIG & TOP DRIVE. (1.00hrs) SLIP & CUT DRILL LINE. (3.50hrs) LD 6 1/4" DC'S - UNLOAD & BACK LOAD BOAT. (7.00hrs) M/U BAKER MWD TOOL - TEST - TROUBLE SHOOT - TEST. (1.50hrs) M/U MUD MTR - ORIENT - TEST - M/U BIT - P/U MONELS & X/O'S. (2.50hrs) RIH - FILL PIPE @ 5680'. (1.00hrs) RIH TO 7800' (TIGHT SPOT 7800 -7816').(4.00hrs) REAM OUT TIGHT SPOT WASH/REAM TO BTM. DMC:$625 CMC:$119869 DWC:$67501 CWC:$1725056 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10/18/00 DFS: 32 OART:DRLG AHEAD - ROTATING & SLIDING MD: 8382 MADE: 40 FMN:COAL MW: 9.9 VISC:66 PV: 20 YP: 22 GELS: 6/: 9 PH: 9.2 WL:5.4 CL:16000 CA:120 SOL: 8.0 LCM: 0 WOB: 10 RPM: 160 TIME DIST: (0.50hrs) FINISH REAMING TO BTM 8342'. (1.00hrs) DRILLING W/ ROTARY F/8342' TO 8346', LOST BLOWER MTRS & HYD SYSTEM ON VARCO TOP DRIVE. (10.50hrs) TROUBLE SHOOT ELECTRICAL PROBLEM ON VARCO TOP DRIVE, REROUTE BLOWER CONTROL CONDUCTOR RUNNINGTHROUGH COMPOSITE CABLE.(3o50hrs) POH TO WINDOW & ADJUST PRESSURE SENSORS ON BLOWER MTRS ON VARCO TOP DRIVE. (1.00hrs) RIH, TAG @ 8270'. (1.00hfs) REAM F/ 8270' TO 8346'. (2.50hfs) ROTARY DRILL F/ 8346' T/ 8355'. (2.00hrs) DRILL SLIDE F/ 8355' T/ 8366'. (0o50hrs) ROTAt{Y DRILL F/ 8366' T/ 8368'. (1.50hrs) DRILL SLIDE F/ 8368'. DMC:$4541 CMC:$124410 DWC:$56421 CWC:$1781477 10/19/00 DFS: 33 OART:TRIPPING FOR BHA CHANGE MD: 8382 MADE: 64 FMN:COAL MW: 9.8 VISC:59 PV: 23 YP: 23 GELS:7/:9 PH: 9.4 WL: 5.2 CL:16000 CA:120 SOL: 8.0 TIME DIST: (4.00hrs) DRILL SLIDE F/ 8342 (ROTATE F/ /8422' - 8427'). (1.00hrs)WORK ON MUD PUMPS° (6.00hrs) DRILL SLIDE T/ 8446, SURVEY (NOT GETTING ENOUGH LEFT TURN). (1.00hrs) CIRC HOLE. (4.50hrs) POH. (1.50hrs) DN LOAD MWD, HANDLE BHA, BREAK BIT. (1.00hrs) PULL WEAR BUSHING, SET TEST PLUG. (4.00hrs) TEST BOPS & CHOKE 250-5000 PSI, HYDRIL 250-2500 PSI.(0.50hrs) PULL TEST PLUG, RUN WEAR BUSHING. (0.50hrs) MU BIT, SET MTR, HANDLE BHA. DMC:$6491 CMC:$130902 DWC:$50500 CWC:$1831978 10/20/00 DFS: 34 OAi~T: MD: 8535 MADE: 89 FMN:COAL MW: 9.8 VISC:60 PV: 20 YP: 18 GELS: 7/:8 PH: 9.4 WL:5.0 CL:15000 CA:120 SOL: 8.0 WOB: 25 RPM: 40 TIME DIST: (9.00hrs) SET MTR TO 1.6 DEGREE , MU BIT, TEST MWD & HANDLE BHA. (3.00hfs) RIH. (0.50hrs) SERVICE RIG & TOP DRIVE (FILL PIPE @ 5647')° (lo50hrs) RIH, TAG @ 8343'. (3.00hrs) WASH DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING ~: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY & REAM F/ 8343' T/ 8446'. (9.50hrs) DRILL SLIDE F/ 8446' T/ 8519'. (1.50hrs) DRILLING W/ ROTARY F/8519' T/8526'. (2.00hrs) DRILL SLIDE. DMC:$3406 CMC:$134308 DWC:$47780 CWC:$1879758 10/21/00 DFS: 35 OART:DRILLING ROTARY @ 8636' MD: 8707 MADE: 172 FMN:CLYSTN 90%/CARB SH 10% MW: 9.8 VISC:60 PV: 24 YP: 20 GELS: 6/:8 PH: 9.5 WL: 5.0 CL:16000 CA:120 SOL:8.0 WOB:25 RPM:40 TIME DIST(1.50hrs) DRILL SLIDE/ORIENT F/ 8535' TO 8548' @ TF OF 90L. (2.00hrs)DRILLING/ROTARY F/ 8548' TO 8556'. 2.00hrs) DRILL SLIDE/ORIENT F/8556' TO 8580' @ TF OF 85L. (1.50hrs) SURVEY & SHORT TRIP TO 8275' SMOOTH. (1.00hrs) DRILL/ROTARY FRM 8580' TO 8586'. (3.00hrs) DRILL SLIDE/ ORIENT F/ 8586' TO 8609' @ TF OF 95L. (1.50hrs) DRILL/ ROTARY F/8609' TO 8615'. (3.00hrs) DRILL SLIDE/ORIENT F/ 8615' TO 8641' @ TF'S OF 90L & 70L. (1.00hrs) DRILL/ ROTARY FRM 8641' TO 8650'. (3.00hrs) DRILL SLIDE/ORIENT F/ 8650' TO 8673' @ TF OF 70L. 1.00hrs) DRILL/ROTARY FRM/ 8673' TO 8683'. (0.75hrs) DRILL SLIDE/ORIENT FRM/8683' TO 8692' @ TF OF 0 (HI SIDE). (0o50hrs) WASH/REAM SLIDE. (2.25hrs) DRILL/ROTARY FRM/ 8692' TO 8707'. DMC:$5555 CMC:$139863 DWC:$47050 CWC:$1926808 10/22/00 DFS: 36 OART: MD: 8739 MADE: 32 FMN:SAND & COAL MW: 9.8 VISC:62 PV: 24 YP: 20 GELS: 6/: 9 PH: 9.3 WL:4o8 CL:16000 CA:120 SOL: 8.0 TIME DIST: (0.75hrs) DRILL/ROTARY F/ 8707' TO 8712'. (2o75hrs) DRILL SLIDE/ORIENT F/8712' TO 8724' @ TF OF 0 HI SIDE. (1.00hrs) WORK/ON MUD PUMP #2. (1.00hrs) DRILL/ROTARY FRM/ 8724' TO 8730'. (2.00hrs) WORK/ON MUD PUMP #2. (2.00hrs) DRILL/ROTARY FRM/ 8730' TO 8739'. (1.00hrs) CIRCULATE WELL. (4o50hrs) POOH F/ NEW BIT, SMOOTH. (5.00hrs) LD BIT #5, LD LOAD MWD & CHG DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY BATTERIES, CHG AKO 1.3o. (0.50hrs) RIH W/ BIT #6 & TEST MWD & MTR. (3.00hrs) RIH TO 5660' . (0.50hrs) FILL PIPE & SERVICE T/DRIVE. DMC:$5241 CMC:$145104 DWC:$60188 CWC:$1986996 10/23/00 DFS: 37 OAi{T:DRILLING MD: 8857 MADE: 118 FMN:SAND & COAL MW : 9.8 VISC: 56 PV: 23 YP: 17 GELS: 6/: 9 PH: 9.6 WL: 5.2 CL:16000 CA:120 SOL: 8.0 WOB: 25 RPM: 70 TIME DIST: (0o50hrs) SERVICE T/ DRIVE. (1.00hrs) STRAP / INSPECT PU & RIH & STD BK 9 JTS DP. (2.00hrs) RIH TO BTM @ 8939', SMOOTH. (0.50hrs) BREAK CIRCULATION. (0.50hrs) DRILL /ROTARY F/8739' TO 8742'. (1.50hrs) CIRCULATE BTM UP. (0.50hrs) DRILL/ROTARY F/ 8742' TO 8750. (0.50hrs) DRILL SLIDE/ORIENT F/ 8750' TO 8754' W/ TF OF 10L. (0.75hrs) DRILL/ROTARY F/ 8754' TO 8758'. (1.25hfs) CHANGE PISTON ON #2 MUD PUMP. (1.00hrs) DRILL SLIDE/ ORIENT F/8758' TO 8768' W/TF OF10L. (0.50hrs)DRILL/ROTARY F/ 8768' TO 8773'. (1.00hrs) #1 MUD PUMP SWAB/OUT. (1.00hrs) DRILL/ROTARY F/ 8773' TO 8783'. (2.50hrs) DRILL SLIDE/ORIENT F/ 8783' TO 8798' W/ TF OF10L. (1.00hrs) DRILL/ROTARY F/879+8' TO 8808'. (4.00hrs) DRILL SLIDE/ ORIENT FRM/ 8808' TO 8833' W/TF OF10L. (3.00hrs) DRILL/ROTARY F/8833' TO 8853'. (1.00hrs) DRILL SLIDE/ORIENT F/8853' TO 8857' W/TF OF 10L. DMC:$5406 CMC:$150510 DWC:$53882 CWC:$2040877 10/24/00 DFS: 38 OART:DRILLING MD: 8995 MADE: 138 FMN:SAND & COAL & CLYSTN MW: 9.8 VISC:59 PV: 22 YP: 18 GELS:7/: 9 PH: 9.3 WL: 5.0 CL:16000 CA:120 SOL: 0.0 LCM: 0 WOB: 25 RPM: 70. TIME DIST: (0.50hrs) DRILL SLIDE/ORIENT FRM/ 8857' TO 8862' W/ TF OF 10L.(2.00hrs) WORK/ON MUD PUMP #1. (4.00hrs) DRILL/ROTA/{Y FRM/8862' TO 8908'. (1.00hrs) CIRCULATE HOLE. (1.00hrs) WIPER TRIP/SHORT TRIP TO 8272' SMOOTH. (2.25hrs) DRILL SLIDE/ORIENT FRM/ 8908' TO 8921' W/ TF OF 0 HI-SIDE - 10L. (3.00hrs) DRILL/ROTARY FRM/ DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE 9:2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 8921' TO 8937'. (3.50hrs) DRILL SLIDE/ORIENT FRM/ 8937' TO 8952' W/ TF OF 0 HI SIDE - 10L. (4o75hrs) DRILL/ROTARY FRM/ 8952' TO 8990'. (2.00hrs) DRILL SLIDE/ORIENT FRM/ 8990' TO 8995' W/ TF OF 0 HI SIDE. DMC:$4038 CMC:$154548 DWC:$58333 CWC:$2093266 10/25/00 DFS: 39 OART:DRILLING MD: 9128 MADE:133 FMN:SAND & COAL & CLYSTN MW :9.8 VISC: 66 PV: 24 YP: 20 GELS: 7/:11PH: 9.5 WL: 5.0 CL: 16000 CA: 120 SOL: 0.0 LCM: 0 WOB:25 RPM: 70. TIME DIST: (2o00hrs) DRILL SLIDE/ORIENT F/ 8995' TO 9003' W/ TF OF 0 HI SIDE, 5R. (4.75hrs) DRILL/ROTARY F/ 9003' TO 9030'. (1.25hrs) CIRCULATE & MAKE SHORT WIPER TRIP TO 8272', SMOOTH. (3.00hrs) DRILL SLIDE/ORIENT FRM/ 9030' TO 9045' W/ TF OF 0 HI SIDE, 10L. (8.00hrs) DRILL/ ROTARY F/9045' TO 9099'. (3.00hrs) DRILL SLIDE/ORIENT F/ 9099' TO 9114' W/ TF OF 0 HI SIDE. (2.00hrs) DRILL/ROTARY FRM/ 9114' TO 9128'. DMC:$4832 CMC:$159380 DWC:$50279 CWC:$2143545 10/26/00 DFS: 40 OART:DRILLING MD: 9261 MADE: 133 FMN:CLAY, SAND, SDSTN MW: 9°8 VISC:64 PV: 26 YP: 18 GELS: 7/:11 PH: 9.5 WL: 4.5 CL:16000 CA:120 SOL: 8.0 LCM: 0 WOB: 25 RPM: 70 TIME DIST: (4o50hrs) DRILL/ROTARY F/ 9128' TO 9161'. (2.50hrs) DRILL SLIDE/ORIENT F/9161' TO 9176' W/ TF OF 0 HI SIDE - 10Lo (0.50hrs) DRILL/ROTARY 'F/9176' TO 9178'. (3.00hrs) SHORT TRIP/WIPER TRIP TO 8240' WASH & REAM TITE SPOTS @ 8920', POOH & 8735' & 8933' RIH. (13.50hrs) DRILL/ROTARY F/9178' TO 9261'. DMC:$5633 CMC:$165013 DWC:$51409 CWC:$2194954 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10/27/00 DFS: 41 OART: MD: 9261 MADE: 522 FMN:CLAY, SAND, SDSTN. MW:10.3 VISC:68 PV: 28 YP: 19 GELS: 7/: 11 PH: 9.5 WL: 4.8 CL:16000 CA:120 SOL: 8.0 LCM: 0 WOB: 25 RPM: 70. TIME DIST: (2.50hrs) CIRCULATE BTM/UP & PUMP SWEEP AROUND. (4.50hrs) SHORT WIPER TRIP TO WINDOW, TITE SPOTS @ 8046', 8069', 5935', & WSH/BK/REAM F/5740' TO 5690' , PULL INTO WINDOW. (1.00hrs) SERVICE TOP/DRIVE & RIG. (4.00hrs) RIH TO 8247', WHS/REAM F/ 8247' TO 8648', RIH F/8648' TO 9213', WSH/REAM F/ 9213' TO 9261'. (5.00hrs) CIRCULATE & CONDITION MUD, INCREASE MUD WT F/9.8 PPG TO 10, 3 PPG & PUMP WT'D SWEEP AROUND. (5.50hrs) POOH TO RUN CSG, SLIGHTLY TITE @ 9007', BUT DID NOT HAVE TO CIRCULATE OR ROTATE, PRETTY SMOOTH TRIP.(1.50hrs) DOWNLOAD MWD/LWD & HANDLE BHA. DMC:$6701 CMC:$171714 DWC:$68328 CWC:$2263282 10/28/00 DFS: 42 OART:RUN 7" LINER MD: 9261 MADE: 0 FMN:CLAY, SAND, SDSTN. MW :10.4 VISC:94 PV: 28 YP: 19 GELS: 7/:11 PH: 9.5 WL: 5.0 CL:16000 CA:120 SOL: 8.0 TIME DIST: (1.00hrs) FINISH DN /LOAD MWD /LWD & LD BHA. (5.00hrs) MU TEST JT, RETRIEVE WEAR RING, SET TST PLUG, FILL STACK, MU TEST ASSEMBLY & TEST BOP. WITNESSED BY JEFF JONES OF AOGCC. GOOD TEST, PULL TST PLUG, SET WEAR RING & LD TST ASSEMBLY. (2.00hrs) CHG / OUT DIES IN PIPE HANDLER, MOVE HWDP & RU TONG UNIT. (10.00hrs) PU, MU 7" LINER & RIH TO 3931.66' (95 JTS). (1.00hrs) PU & MU BAKER LINER HANGER ASSEMBLY & SERVICE. (0.50hrs) CIRCULATE. (1.00hrs) RIH W/ 7" LINER ON RABBITED 5" DP TILL FLOAT SHOE @ 5550'. (1.00hrs) CIRC DP / LINER VOL, ROTATE LINER 7K FT LBS @40 RPM, - UNABLE TO ROTATE SLOWER. (2.50hrs) RIH W/ 7" LINER ON RABBITED 5" DP TO 8696', FILL PIPE. DMC:$1342 CMC:$173056 DWC:$36279 CWC:$2,299,561 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10/29/00 DFS: 43 OART: MD : 9261 MADE: 0 FMN:CLAY, SAND, SDSTN MW:10.3 VISC:92 PV: 28 YP: 20 GELS: 7/:11PH: 9.3 WL: 5.2 CL:16000 CA:120 SOL: 8.0 TIME DIST: (1.00hrs) RIH W/ 7" LINER/ ON RABBITED 5" DP TO BTM ( 9257'), FLT COLLAR @ 9212.92', LANDING COLLAi~ @ 9130.05', LINER HANGER @ 5343.41, "RS" NIPPLE @ 5340.68' & TOL/ PKR @ 5325.34'. (3.00hrs) CIRCULATE HOLE & WORK PIPE, ATTEMPT ROTATE, NO GO, RECIPROCATE OK. (0.50hrs) RU BKR ROT'NG CEMENT HEAD /PLUG DROPPER, CIRC. (0.50hrs) DROP 1 3/4" BALL, PRESS / TST SURF LINES W/ BJ 5000 PSI, PRESS / UP W/BJ TO 2000 PSI & SET HANGER, INCREASE PRESS TO 3000 PSI & RELEASE HYD RUNNNING TOOL, PU OFF HANGER & SLACK / OFF 20K ON HANGER, PRESS /UP TO 4500 PSI TO SHEAR BALL SEAT. (2.50hrs) CIRCULATE 30 BBL BJ WT'D MUD SWEEP, 118.8 BBLS (30% OH EXCESS) (580 SX) CLASS G, W/ .6% FL-33, .3%CD-32, & 1 GAL/100 SX FPD6L TO SLURRY WT OF 15.8 PPG, ATTEMPT DROP PLUG, BKR CMT HEAD, PLUG DROPPER FAILED, DISPLACE CMT W/ RIG PUMPS @ CALC'D DISPLACEMENT TO BKR LANDING COLLAR @ 9130' - CIP = 13:30 HRS. (0.50hrs) SET BKR PKR, LD CMT HEAD & PULL 5 STANDS DP. (0.50hrs) CIRCULATE DP VOLUME. (0.50hrs) POOH TO 3600'. (4.50hrs) POOH & LD 5' DP (114 JTS). (1.00hfs) BRK / DN BKR SETTING TOOL & CMT HEAD. (1.00hrs) MU CLEAN / OUT BHA. (2.00hfs) RIH W/ 8 1/2" BIT & 5" DP & TAG TOL @ 5326' DPM. (1.00hrs) CIRCULATE BTM/UP & PUMP DRY JOB. (5.50hrs) POH & LD 5" DP. DMC:$625 CMC:$173681 DWC:$126459 CWC:$2,426,020 10/30/00 DFS: 44 OART: MD: 9261 MADE: 0 FMN: MW:10.4 VISC:** PV: 28 YP: 19 GELS: 7/:11 PH: .2 WL:5.4 CL:15000 CA:140 SOL: 8.0 TIME DIST:(6.00hrs) CLEAN PITS, READY #7 CAT & READY FOR BOAT. (12.00hrs) CLEAN PITS, FLOWLINE & TRIP TANK, SET / IN NEW DRILLING LINE SPOOL, INSTALL NEW TOP / DRIVE CONTROL CABLES W/ QUATCO, EMPTY 1) ISO TANK (120 BBLS) OF DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY OBM TO PITS, BACK LOAD BOAT. (6.00hrs) CHANGE / OUT SAVER-SUB, CHANGE /OUT PIPE RAMS, CLEAN POLUTION PANS, RE-BUILD 2" VALVE FOR CMT LINE STAND PIPE, READY DECKS FOR BOAD OFFLOAD (2ND TRIP). DMC:$864 CMC:$174545 DWC:$33,469 CWC:$2,459,489 10/31/00 DFS: 45 OART:P.U. 3 1/2" ASSY. MD: 9261 MADE: 0 MW:10.4 VISC:** PV: 28 YP: 19 GELS: 7/:11 PH: 9.0 WL:5.4 CL:15000 CA:140 SOL: 8.0 TIME DIST: (6.00hrs) CHANGE SHAKER SCREENS, CLEAN POLUTION PAN UNDER ROTARY DRIVE, CHANGE DIES IN IRON ROUGHNECK, CHANGE /OUT DRLG SPOOLS & STRING NEW DRILLING LINE. (9.00hrs) SPOOL /OFF OLD DRILLING LINE, ADJUST DC POWER ON GEN'S 5 & 6, CHANGE /OUT BRAKE ADJUSTING EYE BOLT ON DRILLIER'S SIDE, REPLACE BOLTS & NUTS ON BRAKE PADS, SLIP NEW DRILLING LINE, CALIBRATE CRANE WT INDICATORS, & STRAP CLEAN / OUT BHA. (2.50hrs) PULL WEAR RING & MU TST ASSEMBLY, TEST 3 1/2" PIPE RAMS, SAFETY VALVE, DART VALVE 250/5000 PSI, OK. TEST ANNULAR 250/5000 PSI, OK. RD TEST ASSEMBLY, SET WEAR RING. (0.50hrs) ADUST DRAW WORKS BRAKES. (1.00hrs) SERVICE TOP/DRIVE. (1.00hrs) PU CLEAN / OUT BNA. (4.00hrs) PU 3 1/2" DP & RIH. NOTE: MISSED 3 LOAD / OUTS @ DOCK DUE TO HIGH WINDS & SEAS @ DOCK, STILL HAVE MAJORITY OF OBM COMING, BOAT ETA = 11:00 HRS - EPOCH & INTEQ DUE THIS AM. DMC:$625 CMC:$175170 DWC:$23762 CWC:$2,483,251 11/01/00 DFS: 46 OART: MD: 9261 MADE:0 FMN: MW: 9.9 VISC:50 PV: 16 YP: 16 GELS: 4/:5 PH: 8.5 WL:8.8 CL:15000 CA:160 SOL: 8.0. TIME DIST: (7.00hrs) PU 3 1/2" DP & RIH. (5.00hrs) OFF LOAD BOAT, FILL PITS W/OBM. (0.50hrs) PU 3 1/2" DP, RIH, TAG, BKR LANDING COLLAR @ 9130' o (2.00hrs) PRESS TST LINER, LAP, & 9 5/8" CASING TO 3000 PSI F/ 30 MIN, BLED TO 2850 PSI, CALLED & OK'D W/ ENGINEER, OK - (ON CHART). (1.00hrs) DRILL LANDING COLLAR 9130' TO 9131.5', NO CMT UNDER COLLAR. (1.00hrs) RIH & WASH THRU SOFT STRINGERS TO DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE 9:2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY FLOAT COLLAR @ 9213'. (1.50hrs) DRILL FLOAT COLLAR F/ 9213' TO 9214.5', NO CMT UNDER COLLAR. (0.50hrs) RIH & WASH TO JUST ABOVE FLOAT SHOE @ 9249' (T/ SHOE @ 9254'), SHOE IS NO DOUBT WET, DISCUSS W/ ENGINEER & PLAN SHOE SQUEEZE FOR NEXT BOAT. (5.50hrs) DISPLACE OKD MUD W/ OBM, REVERSE / CIRCULATE & DUMP OLD MUD. PLAN IS TO: BRING CMT & HANDS / OUT THIS AM & DO SHORT INJECTIVITY TST TO DETERMINE SIZE OF SHOE SQUEEZE. DMC:$625 CMC:$175795 DWC:$38212 CWC:$2521463 11/02/00 DFS: 47 OART: MD: 9281 MADE: 20 FMN:HARD SAND MW: 8.2 VISC:72 PV: 19 YP: 17 GELS: 14/:22 PH: 0.0 WL:3.8 CL: 25550 CA: 0 SOL: 8.0 WOB: 10 RPM: 70. TIME DIST: (5.50hrs) COVER HOLES IN J-TUBE, INSTALL AUGER, & MIX OBM. (1.00hrs)CIRCULATE & CONDITION OBM. (0.50hrs) ATTEMPT PUMP THRU FLOAT SHOE @ 9255' - NO GO. (3.50hrs) DRILL FLOAT SHOE F/ 9255' TO 9257', FIRM UNDERNEATH SHOE. (1.50hrs) TEST SHOE TO 2000 PSI, NO LEAK /OFF, 12.7 EMW. (0.50hrs) WASH/REAM F/9257' TO 9261'. (6.00hrs)DRILL /ROTARY F/ 9261' TO 9281' - (20 FT FORFLATION) o (lo00hrs) PERFORM LEAK / OFF TEST @ 9281' . PRESS / UP IN 1/4 BBL INCREMENTS TO 2850 PSI W/ 6.4 BBLS PUMPED, 15.5 PPG EQUIVICAL MUD WT, DID NOT GO LEAK /OFF. BLED /BK TO 0 PSI & RECOVERED 6.41 BBLS, GOOD LEAK /OFF TEST. (1.00hrs) CIRCULATE & PUMP DRY JOB. (3.50hrs) POOH FOR DIRECTIONAL ASSEMBLY. DMC:$15086 CMC:$190881 DWC:$53306 CWC:$2574769 11/03/00 DFS: 48 OART: MD: 9432 MADE: 151 FMLN:~D SAND MW: 8.2 VISC:62 PV: 13 YP: 14 GELS:8/:ll PH: 0.0 WL:3.8 CL:16000 CA: 0 SOL: 8.0 LCM: 0 WOB: 15 RPM: 80. TIME DIST: (0.50hrs) POOH FOR DIRECTIONAL BHA.(3.50hrs) P/U BHA - TST MWD & MOTOR.(2.00hrs) P/U 48 JTS OF 3 1/2" DP, RABBIT SAME, & DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING 9: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY RACK/BK. (3.00hfs) RIH TO 9257'-7" SHOE.(0.50hrs) WASH/ REAM FRM 9257' TO 9281' BTM.(14.50hrs) DRILL/ROTARY FRM/ 9281' TO 9432'. DMC:$5708 CMC:$196589 DWC:$51237 CWC:$2626005 11/04/00 DFS: 49 OART:TRIPPING F/BIT MD: 9531 MADE:99 FMN:HARD SAND. MW: 8.3 VISC: 72 PV: 18 YP: 15 GELS: 13/:25 PH: 0.0 WL: 3.8 CL:15000 CA: 0 SOL: 8.0 LCM: 0 WOB: 15 RPM: 75 TIME DIST: (1.00hrs) DRLG ROTATE W/ MTR T/ 9472'. (4.50hrs) SLIDE W MTR T/ 9477'. (1.00hrs) DRLG ROTATE W/ MTR T/ 9480'. (2.00hrs) WIPER TRIP TO SHOE 9357', TIGHT SPOT @ 9320'. (3.00hrs) DRLG ROTATE W/ MTR T/ 9514'. (4.00hrs) SLIDE W/ MTR T/ 9535'. (3.00hrs) CIR BTMS UP - PUMP SWEEP - SPOT SOLTEX PILL ACROSS OPEN HOLE. (1.00hrs) POH TO SHOE - TIGHT SPOT F/ 9370' TO 9320' HAD TO PUMP & ROTATE THRU TIGHT SPOT. (0.50hrs) PUMP DRY JOB. (3.00hrs) POH. (1.00hrs) HANDLE BHA - DN LOAD MWD. DMC:$4475 CMC:$201064 DWC:$57534 CWC:$2683539 11/05/00 DFS: 50 OART:TRIP FOR BIT MD: 9531 MADE:50 FMN:SAND, SILT & CLAY. MW: 8.4 VISC:85 PV: 18 YP: 12 GELS:10/:18 PH: 0.0 WL:3.2 CL:14000 CA: 0 SOL: 8.0 LCM: 0 WOB: 15 RPM: 100 TIME DIST: (0.50hrs) DN LOAD MWD. (5.50hrs) TEST BOPS 250/5000 PSI, ANNULAR 250/2500 PSI - LOW, GRIMALDI W/ AOGCC WAIVED WITNESSING TEST. (3.00hrs) P/U 2 JUNK BASKETS & NEW BHA - LEFT OUT ALL BAKER TOOLS. (4.00hrs) RIH. (0.50hrs) FAN BTM, WORK STRING ATTEMPT TO LOAD JUNK BASKETS. (7o00hrs) DRLG TO 9581'. (2.00hrs) CIR BTMS UP - PUMP SWEEP. (0.50hrs) POH TO SHOE - VERY LITTLE TIGHT HOLE. (1.00hrs) PUMP DRY JOB - POH F/ BIT . 11/06/00 DFS: 51 OART:DRILLING 6" HOLE MD: 9634 MADE:53 FMN:SAND, SILT & CLAY. MW: 8.5 VISC:** PV: 22 YP: 15 GELS: 16/:27 PH: 0.0 WL: 3.2 CL:15000 CA: 0 SOL: 8.0 LCM: 0 WOB:15 RPM: 60 TIME DIST: (2.00hrs) POH. (2.00hrs) HANDLE BHA - DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE %: 2000172 ACCOUNTING %: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY CLEAN OUT JUNK BASKETS (RECOVER BEARINGS, BUTTONS & CEMENT SHOE PIECES). (2.00hrs) M/U BIT & BHA - SET MTR @ 1.1 DEGREE - CHANGE OUT RESISITIVITY TOOL. (2.50hrs) VERIFY RESISITIVITY TOOL & ORIENT MWD - RIH 5 STDS CK MWD (FAILED). (0.50hrs)POH (WET). (2.00hrs) CHANGE OUT & ORIENT MWD - VERIFY RESISITIVITY TOOL - TEST MWD (OK). (4.50hfs) RIH - RETEST MWD @ 1000' - FILL DP @ 8560' - WORK THRU TIGHT SPOT @ 9320'. (0.50hrs) WASH/REAM FROM 9494 TO 9581'. (0o75hrs) LOG FROM 9525 TO 9581'. (3.25hrs) DRLG ROTATE W/MTR T/9597'. (2.00hrs) DRILL SLIDE T/ 9618'. (2.00hrs) DRLG ROTATE W/MTR T/9634'. DMC:$3658 CMC:$208380 DWC:$52227 CWC:$ 2792995 11/07/00 DFS: 52 OART:CIR BTMS UP FOR BIT TRIP MD: 9865 MADE: 231 FMN:SAND. MW: 8.5 VISC:94 PV: 25 YP: 16 GELS:17/:30 PH: 0.0 WL: 2.3 CL:14000 CA: 0 SOL: 8.0 WOB: 15 RPM: 60 TIME DIST: (23.00hrs) DRILLING ROTATING W/ MTR T/9865.(1.00hrs) CIR BTMS UP & PUMP SWEEP, PREPARE TO TRIP FOR BIT. DMC:$3595 CMC:$208317 DWC:$49082 CWC:$2842077 11/08/00 DFS: 53 OART:DRILLING A/READ MD: 9961 MADE: 96 FMN:SAND MW: 8.6 VISC:** PV: 29 YP: 17 GELS: 20/:31 PH: 0.0 WL: 3.3 CL:15000 CA: 0 SOL: 8.0 WOB: 15 RPM: 60. TIME DIST: (0.50hrs) CIR BTMS UP & PUMP SWEEP. (1.50hrs) POH TO SHOE (TIGHT). (0.50hfs) PUMP DRY JOB. (3.00hrs) POH. (1.50hrs) PULL BNA, BREAK BIT DN, LOAD RESISITIVITY TOOL, MU BIT. (3.00hrs) RIH, CK MWD @ 1000', FILL DP @ 8500'. (1.50hrs) SLIP & CUT DRILL LINE, PUMP UP WT INDICATER. (1.00hrs) RIH, WASH & REAM 60' TO BTM. (3.00hrs) SLIDE F/9865' T/ 9895'. (2.50hrs) ROTATE W/ MTR F/ 9895' T/9916'.(2.50hrs) SLIDE F/ 9916' T/ 9935'. (2.50hrs) ROTATE F/ 9935' T/ 9960'. (1.00hrs) SURVEY & ORIENT TOOL. DMC:$40714 CMC:$249031 DWC:$82351 CWC:$2924427 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 11/09/00 DFS: 54 OART:CIR FOR BIT TRIP MD:10180 MADE: 219 FMN:SAND MW: 8.5 VISC:94 PV: 26 YP: 16 GELS: 19/:31 PH: 0.0 WL: 2.4 CL:16500 CA: 0 SOL: 8.0 WOB: 15 RPM: 60 TIME DIST: (2.00hrs) SLIDE F/ 9961' T/ 9981'. (2.50hrs) ROTATE F/ 9981' T/10011'. (2.50hrs) SLIDE F/ 10011' T/ 10026'. (1.00hrs) ROTATE.(0.50hrs) REPAIR LEAK @ TOP DRIVE. (5.50hrs) ROTATE TO 10093'. (1.50hrs) SLIDE F/ 10093' T/ 10110'. (7.50hrs) ROTATE T/10180'. (1.00hrs) CIR BTMS UP & PUMP SWEEP BEFORE TRIPPING FOR BIT. DMC:$5804 CMC:$254835 DWC:$62423 CWC:$2986851 11/10/00 DFS: 55 OART:DRILLING AHEAD 6" HOLE MD:10274 MADE: 94 FMN:SAND MW: 8.6 VISC:** PV: 28 YP: 20 GELS: 21/: 32 PH: 0.0 WL: 2.3 CL:18000 CA: 0 SOL: 8.0 WOB: 15 RPM: 60 TIME DIST: (1.50hrs) CIR BTMS UP & PUMP SWEEP. (1.00hrs) POH TO SHOE. (0.50hrs)PUMP DRY JOB. (4.50hrs) POH. (2.50hrs) BREAK BIT, VERIFY RESISITIVITY TOOL, GAUGE STABS, CHANGE OUT MUD MTR, MU BIT & ORIENT TOOL. (3.50hrs) RIH CHECK MWD @ 1000', FILL DP @ 8600'. (0.50hrs) WASH & REAM 95' TO BTM. (1.25hrs) ROTATE F/ 10180 T/ 10192'. (0.25hrs) ORIENT TOOL FACE. (1.25hrs) SLIDE F/10192 T/ 10206'. (0.50hrs) REAM & CHANGE PUMP. (6.75hrs) ROTATE F/ 10206' T/ 10274'. DMC:$2312 CMC:$257147 DWC:$70409 CWC:$3057259 11/11/00 DFS: 56 OART:DRILLING AHEAD 6" HOLE MD:10463 MADE: 189 FMN:SAND MW: 8.7 VISC:** PV: 30 YP: 18 GELS:19/:31 PH:0 WL:i.9 CL:23000 CA: 0 SOL: 8.0 LCM: 0 WOB: 15 RPM: 60 TIME DIST: (0.25hrs) ROTATE F/ 10,274' T/ 10,276'. (0.75hrs) SLIDE F/ 10,276' T/10,281'. (1.00hrs) WORK ON MUD PUMPS. (1.25hrs) SLIDE F/ 10,281' T/10,297'. (0.50hrs) ROTATE F/ 10,297' T/ 10,300'. (0.50hrs) WORK ON MUD PUMPS.(2.00hrs) ROTATE F/10,300 T/10,316'. (3.50hrs) SLIDE F/10,316' T/ 10,346'. (1.25hrs) ROTATE F/ 10,346' T/ 10,361'. (0.50hfs) REAM HOLE & MAKE CONN. (4.25hrs) ROTATE F/ 10,361' T/ DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 10,410'. (0.25hrs) SURVEY & ORIENT TOOL. (5.00hrs) SLIDE F/ 10,410' T/ 10,438'. (0.50hrs) REAM HOLE. (2.50hrs) ROTATE F/ 10,438' T/ 10,463'. DMC: $2140 CMC: $259287 DWC: $61751 CWC: $3119011 11/12/00 DFS: 57 OART:DRLG AHEAD 6" HOLE MD:10473 MADE:12 FMN:SAND MW: 8.7 VISC:** PV: 30 YP: 16 GELS: 18/: 30 PH: 0.0 WL: 1.8 CL:22000 CA: 0 SOL: 8.0 WOB: 15 RPM: 60 TIME DIST: (0.50hrs) ROTATE F/ 10,463' T/ 10,464'. (2.00hfs) CIRc BTMS UP & PUMP DRY JOB. (5.50hrs) POH. (1.50hrs) BREAK BIT, DN LOAD RESISITIVITY TOOL & MU NEW BIT. (4.50hrs) TEST BOPS 250 / 5000 PSI. (2.00hrs) CHANGE OUT BATTERIES & VERIFY RESISITIVITY TOOL, ORIENT. (6.00hrs) PU SINGLES F/ CAT WALK, }{IH T/ 10,373'. (0.50hrs) WASH/REAM 90' TO BTM. (1.50hrs) ROTARY DRILL F/ 10,464' T/ 10,473'. DMC: $3330 CMC: $262617 DWC: $54744 CWC: $3173755 11/13/00 DFS: 58 OART:DRLG AHEAD 6" HOLE MD:10646 MADE: 173 FMN:SHALE, SAND & SILT MW: 8.6 VISC:** PV: 28 YP: 19 GELS: 18/:30 PH: 0.0 WL: 2.0 CL:22500 CA: 0 SOL: 8.0 WOB:15 RPM: 60 TIME DIST: (7.00hrs) ROTATE F/ 10,473' T/ 10,528'. (1.00hrs) ORIENT TOOL FACE & CHANGE PUMPS. (4.00hrs) SLIDE F/ 10,528' T/ 10,553'. (0.50hrs) REAM THE HOLE. (4.50hrs) ROTATE F/ 10,553' T/ 10,582'. (0.50hrs) REPAIR CONN LEAK. (6.50hrs) ROTATE F/ 10,582' T/ 10,646' . DMC: $2757 CMC: $265374 DWC:$49086 CWC: $3222841 11/14/00 DFS: 59 OART:CIR & COND. HOLE TO RUN 5" LINER MD:10750 MADE:104 FMN:CLAY, SILT & COAL MW: 8.7 VISC:** PV: 30 YP: 16 GELS:18/: 29 PH: 0.0 WL:2.2 CL:23000 CA: 0 SOL: 8.0 WOB: 15 RPM: 60 TIME DIST: (10.50hrs) ROTATE F/ 10,646' T/ 10,750'. (2.00hrs) CIR BTMS UP. (3.50hrs) WIPER TRIP TO 7" SHOE, TIGHT HOLE OUT, WASH & REAM TO BTM LAST 130'. (3o50hrs) MIX & PUMP SWEEP, CIR BTMS UP. (1.00hrs) SHORT DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTI~LATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY TRIP 3 STDS (TIGHT).(3.50hrs) PUMP WEIGHTED SWEEP, CIRC & COND HOLE TO RUN 5" LINER. DMC:$3269 CMC:$268643 DWC:$53143 CWC:$3275984 11/15/00 DFS: 60 OART:RUN 5" LINER IN ON 3 1/2 DP MD:10750 MADE:0 FMN:CLAY, SILT & COAL MW: 8.8 VISC:** PV: 30 YP: 16 GELS: 17/: 29 PH: 0.0 WL: 2.0 CL:22000 CA:0 SOL: 8.0 TIME DIST:(1.00hrs) CIR & COND HOLE F/ 5" LINER, PUMP DRY JOB. (6.50hfs) POH F/5" LINER. (2.50hfs) DN LOAD MWD & L/D BHA. (2.50hrs) CLEAR FLOOR - R/U CSG TONGS, PREPARE TO P/U 5" LINER. (5.50hrs) PU 41 JTS, 1833.02' OF 5" 17.95# L-80 STL LINER & BAKER HANGER. (5.50hfs) RIH W/ 5" LINER W/3 1/2 DP F/ DERRICK. (0.50hrs) CHANGE OUT SAVER SUB & MAKE UP DIES ON TOP DRIVE. DMC:$3791 CMC:$272434 DWC:$45449 CWC:$3321433 11/16/00 DFS: 61 OART:LAYING DN LINER RUNNING TOOLS. MD:10750 MADE: 0 FMN: MW: 9.0 VISC:** PV: 30 YP: 16 GELS: 17/:28 PH: 0.0 WL: 2.0 CL:22000 CA: 0 SOL: 8.0 TIME DIST: (2.50hrs) REPLACE SAVER SUB & REPAIR BACK UP DIES ON TOP DRIVE. (5.50hrs) RIH W/ 5" LINER ON 3 1/2 DP. (1.00hrs) STOP @ 7" SHOE CIR LINER VOLUME CK ROT & DRAG. (1.00hrs) RIH T/ 10721'. (1.00hrs) WASH TO 10743. (3.50hrs) CIRC BTM UP WHILE RECIPROCATING & ROTATING @ 30 RPM. MU CMT HEAD, DROP BALL & SET HANGER. (1.50hrs) CMT 5" 18# L-80 STL LINER W/ BKR FLEXLOCK LINER HANGER & ZXP LINER TOP PKR. TOP OF LINER @ 8907', SHOE DEPTH 10,740'. BJ MIXED AND PUMPED 18 BBL WTR FOLLOWED BY 28 BBL MCS 4D, 10 PPG SPACER, 30.3 BBL 15.8 PPG, FOLLOWED BY 142 SACKS CLASS G, DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 3% R-3, 2% KCL, 0.6% CD-32, 0.15% A-2, 0.8% BA FOLLOWED BY 5 BBL WTR. DISPLACED CMT W/ RIG PUMP AT 4 BPM BUMPED PLUG W/ 2500 PSI. (ROTATED LINER 30 RPM THRU ENTIRE JOB). (0.50hrs) RIG DN CMT HEAD, POH 1 STD. (1.00hrs) REV CIRC BACK CMT & SPACER. (1.50hrs) CIR LONG WAY & PUMP DRY JOB. (4.00hrs) POH. (1.00hrs) LAY DN LINER RUNNING TOOLS. DMC:$1262 CMC:$273696 DWC:$47659 CWC:$3369092 11/17/00 DFS: 62 OART: MD:10750 MADE: 0 FMN: MW: 8.9 VISC:** PV: 27 YP: 18 GELS: 16/: 26 PH: 0.0 WL: 2.0 CL:22000 CA: 0 SOL: 8.0 TIME DIST: (3.00hrs) SERVICE TOP / DRIVE & RIG, CHANGE / GEAR OIL IN GEAR BOX OF TOP /DRIVE FILTER. (2.00hrs) WORK ON T/ DRIVE, STABILIZER ASSEMBLY. (4.00hrs) RIH W/ 6" BIT ON DP & TAG T/ 5" LINER @ 8914' DPM. (1.00hrs) CIRCULATE & PUMP DRY-JOB. (3.50hrs) POOH & LD 6" BIT. (9.75hrs) PU 4 1/8" BIT, RIH W/2 7/8" DP. (0.75hrs) RIH W/ 3 1/2" DP. DMC:$1820 CMC:$275516 DWC:$53792 CWC:$3422884 11/18/00 DFS: 63 OART:DRILL CMT IN 5" LINER MD:10750 MADE: 0 FMN: MW: 9.0 VISC:** PV: 27 YP: 18 GELS:16/:26 PH:0.0 WL: 2.0 CL:22000 CA: 0 SOL: 8.0 TIME DIST: (3.00hrs) RIH & TAG CMT @ 10,206' (404' HI TO CALC'D PLUG IN LANDING COLLAR). (7.00hrs) DRILL CEMENT F/ 10206' TO 10234', UNABLE TO PUT ENOUGH WT ON STRING DUE TO TORSIONAL LIMITS OF 2 7/8" PAC. (1.00hrs) CIRCULATE & PUMP DRY JOB. (3.50hrs) POOH FOR BHA. (3.50hrs) LD BIT #14 (4 1/8"), PU BIT #15 & 3 1/8" MUD MOTOR. (4.00hfs) RIH W/ 2 7/8" & 3 1/2" DP. (1.00hrs) SLIP & CUT DRILL LINE - 100'. (1.00hrs) RIH W/ 2 7/8" & 3 1/2" DP. DMC:$1281 CMC:$276797 DWC:$36143 CWC:$3459027 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 11/19/00 DFS: 64 OART: MD:10750 MADE: 0 FMN: MW: 8.8 VISC:** PV: 27 YP: 18 GELS: 16/: 26 PH: 0.0 WL: 2.0 CL:22000 CA: 0 SOL: 8.0 TIME DIST: (1.00hrs) RIH & TAG T/ CMT @ 10234'. (10.00hrs) DRILL HARD CMT FRM/10234' TO 10468' DPM. (1.00hrs) CIRCULATE & PUMP DRY JOB. (6.00hrs)POOH FOR BIT CHANGE. (0.50hrs) LD BIT #15 & CHK MOTOR, LD MTR & 2 JTS 2 7/8". (5.50hrs) PULL WEAR RING, RU TEST ASSEMBLY, PUMP OUT STACK, & TEST BOP 250 / 5000 PSI W/ ANNULAR 250 / 2500 PSI AS /PER AOGCC TEST FORM, GOOD TEST, - RD TEST ASSEMBLY & INSTALL WEAR RING & PUMP /OUT STACK. DMC:$1362 CMC:$278159 DWC:$32684 CWC:$3491711 11/20/00 DFS: 65 OART: MD:10750 MADE: 0 FMN: MW: 8.8 VISC:95 PV: 29 YP: 19 GELS: 16/:29 PH: 0.0 WL: 2.0 CL:24000 CA: 0 SOL: 8.0 TIME DIST: (2.00hrs) MU BIT #16 (4 1/8"), CHK MOTOR & HANDLE BHA. (3.50hrs) RIH & TAG T/ CMT @ 10468' DPMo (13.00hrs) DRILL CEMENT F/ 10,468' TO LANDILNG COLLAR @ 10,610' DRILL LANDING COLLAR & CMT TO 10,698' (T/ FLOAT COLLAR). (3.50hrs) CIRCULATE WELL BTM/UP+. (1.50hrs) RU & TEST CASING (5", 7", & 9 5/8") TO 2600 PSI AS / PER PROD ENG C. POPE FOR 30 MIN, TEST HELD ROCK SOLID FOR 30 MIN, GOOD TEST. (0.50hrs) CIRCULATE & PUMP DRY JOB PRIOR TO POOH FOR SCRAPER. DMC:$2748 CMC:$280907 DWC:$32274 CWC:$3523985 11/21/00 DFS: 66 OART:RUN 5" CASING SCRAPER MD:10750 MADE: 0 FMN: MW: 8.8 VISC:** PV: 29 YP: 19 GELS: 16/: 29 PH: 0.0 WL: 2.0 CL:24000 CA: 0 SOL: 8.0 TIME DIST: (3.50hrs) POOH FOR SCRAPER RUNS. (0.50hrs) MOVE DRILL COLLARS IN DERRICK. (3.00hrs) RU TBG FINGERS & HANDLE WET 2 7/8", LD 2 JTS 2 7/8", MUD MOTOR & BIT. (1.50hrs) MEAS TANDEM SCRAPER RUN (9 5/8" &N 7") - CLEAN RIG FLOOR. (3.50hrs) RIH W/ TANDEM SCRAPERS TO 8914' DPM. (2.00hrs) CIRCULATE BTM/UP & PUMP DRY JOB. (3.00hrs) POOH W/ TANDEM SCRAPERS. (2.00hrs) M/U 5" SCRAPER ASSEMBLY & HANDLE 2 7/8" BNA. -51- DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETKACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY (3.50hrs) RIH. W/.5" .... SCRAPER ASSEMB~Y..T0 10,.698' DPM. (0.50hrs) PUMP DRY JOB. (1.00hrs) POOH.'"" NOTE : 'HAVE TO RIH "SLICK" FOR REVERSE DISPLACEMENT OF FLUIDS SO AS NOT TO PACK /OFF @ SCRAPER DMC:$5535 CMC:$286442 DWC:$36610 CWC-$3560595 11/22/00 DFS: 67 OART:CHANGE OUT MUD SYSYTEM TO COMPLETION FLUID MD:10750 MADE: 0 FMN: MW: 8.9 VISC:** PV: 29 YP: 19 GELS: 16/:29 PH: 0.0 WL: 2.0 CL:24000 CA: 0 SOL: 8.0. TIME DIST: (2.50hrs) POOH W/ 3 1/2" DP. (1.50hfs) HANDLE 2 7/8" & LD 5" SCRAPER & 4 1/8" BIT, MU BIT & BIT SUB. (1.00hrs) RIH W/ 2 7/8" & CHG ELEVATORS. (2.50hrs) RIH W/ 3 1/2" DP. (3.50 hrs) CIRCULATE MUD & STRIP BAR W/ CENTRIFUGE. (1.00hrs) MIX WEIGHTED SPACER. (4.00hrs) DISPLACE WELL W/ WEIGHTED SPACER FOLLOWED BY FIW, LOAD ISO TANKS FOR W/ OBM & LOAD ONTO BOAT. (8.00hrs) INJECT SPACER & H20, CLEAN TRIP TANK, RIG FLOOR & DRAINS, PUMP THRU 4" & T" & CHOKE LINES, PULL COVER ON GAS BUSTER & CLEAN VESSEL, READY DECKS FOR NEXT BOAT W/ MT ISO TANKS. DMC: $917 CMC: $285525 DWC: $30885 CWC: $3591480 11/23/00 DFS: 68 OART: MD:10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS: 0/:0 PH: 0.0 WL: 0.0 CL:iS000. TIME DIST:(6.00hrs) READY DECKS FOR BOAT, UNLOAD BOAT W/ MT TANKS, SHIP OBM FRM/PITS TO TANKS CLEAN PITS. (14.50hrs) CLEAN PITS, BACK LOAD BOAT, TOP OFF PITS W/ FIW, INSTALL SHAKER SCREENS. (2.50hrs) CIRCULATE & DISPLACE WELL W/ CLEAN FIW & INJECT RETURNS. (1.00hrs) POOH W/ CLEAN OUT ASSEMBLY. DMC:$-47500 CMC:$238025 DWC:$-1458'8 CWC:$3576892 11/24/00 DFS: 69 OART: MD:10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS: 0/:0 PH: 0.0 WL: 0.0 CL:18000. TIME DIST: (3.50hrs) FINISH POOH W/ CLEAN/OUT ASSEMBLY. (3.00hrs) ND BELL NIPPLE, NU WL SHOOTING FLANGE. (2.00hrs) DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY RU SWS, TEST LUB 2000 PSI, OK.(3.00hrs) RIH W/CCL /GUAGE RING & TAG PBTD @ 10700', POOH. (5o50hrs) RIH W/ CBT / GR / CCL & LOG F/ 10,690' TO 5000', (HI TO TOP/ 5" LINER POOR CMT BOND) (GOOD BOND F/ SHOE TO 8670', FAIR BOND F/8670' TO 7360' & FREE PIPE F/ 7360' TO T/ 7" LINER). THIS LOG CORRELATED W/ RESISTIVITY / GR / RWD LOG, LOG W/ 1500 PSI ON CASING, POOH, LD TOOLS & RD SWS. (2.00hrs) ND WL SHOOTING FLANGE & NU BELL NIPPLE. (1.00hrs) HOLD SAFETY MEETING & R/U TO RUN TCP GUNS. (3.50hrs) PU & MU TCP GUNS & 15 JTS 2 3/8" SLH90 DRILL PIPE . (0.50hrs) RIH W/ TCP GUN ASSEMBLY ON DP. DMC:$-0- CMC:$238025 DWC:$45868 CWC:$3622760 11/25/00 DFS: 70 OART: MD:10750 MADE: 0 F~N: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS:0/:0 PH: 0o0 WL: 0.0 CL:18000. TIME DIST: (3.00hrs) FINISH RIH W/ TC? GUNS ON DP.(1.00hrs) TAG T/ 5"LINER W/ NO /GO & PU & POSITION TCP'S & RU ECHOMETER. (0.50hrs) BREAK CIRC, REPAIR AC POWER & HOLD SAFETY MTNG. (0.50hrs) PRESS UP ANNULUS, BLEED OFF & DETONATE TCP'S. (1.00hrs) POOH TO 9288'. (0.50hrs) MONITOR WELL. (0.50hrs) SERVICE RIG & T/ DRIVE. (1.00hrs)REPLACE LINK TILT CYLINDER ON T/ DRIVE & ADJUST SAME. (2.50hrs) POOH W/ TCP ASSEMBLY. (lo50hrs) LD 2 3/8" SLH90 DRILL PIPE. (3.00hrs) SAFETY MTNG LD TCP'S , 86' OF TCP'S FIRED (HC & HE), ALL ELSE MISSFIRED, LOST CONINUITY IN PRIMER CORD. (4.00hrs) MU FIRING HEAD, RIH W/ TCP ASSEMBLY TO 300'. (5.00hrs) MONITOR WELL & WAIT / ON CHOPPER TO BRING XO FOR 2 7/8" PAC X 2 3/8 SLH90, CLEAN RIG. DMC:$-0- CMC:$238025 DWC:$26732 CWC:$3649492 11/26/00 DFS: 71 OART: MD:10750 MADE: 0 FMN: MW: 8.6 VISC: 0 ?V: 0 YP: 0 GELS: 0/:0 PH: 0o0 WL: 0o0 CL:18000 TIME DIST:(6.00hrs) MONTOR WELL & WAIT ON XO, LOST TIME DUE TO MISSFIRE. (0.50hrs) POOH W/ TCP GUN ASSEMBLY. (1.50hrs) MU NEW FIRING HEAD & PU 4 STDS OF 2 7/8" PAC & 14 JTS 2 3/8" DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIPIATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY SLH90 DP & XO. (5.00hrs) RIH W/ TCP ASSEMBLY. (1.00hrs) TAG T/ 5" LINER W/ NO/GO & SPACE OUT & LOCATE, R/U BJ. (1.50hrs) SAFETY MTNG & TST SURF LINES 6000 PSI, PRESS UP TO SHEAR CIRC SUB & BLEED OFF & FIRE GUNS. (1.00hrs) POOH TO 9734'. (0.50hrs) MONITOR WELL. (3.00hrs) POOH W/TCP ASSEMBLY. (1.00hrs) LD 2 3/8" DP & 2 7/8" PAC. (3.00hrs) BRK OUT & LD TCP GUNS, NO MISSFIRES - (HK, HN, & HR ZONES PERF'DW/ 60 DEG PHASE & 6 SPF). DMC: $-0- CMC: $238025 DWC:$26763 CWC: $3676255 11/27/00 DFS: 72 OART: MD:10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS: 0/: 0 PH: 0.0 WL: 0.0 CL:18000. TIME DIST: (0.50hrs) RD TONGS & CLEAN RIG FLOOR. (1.00hrs) MU TST JT, RETRIEVE WEAR RING & SET TST PLUG, MU TST ASSEMBLY. (3.00hrs) TST BOPE 250 / 5000 PSI W/ ANNULAR TO 250/2500 PSI AS PER AOGCC TST FORMAT. (0.50hrs) PULL TST PLUG & SET WEAR RING, RD TST ASSEMBLY & LANDING JT. (1.50hrs) PU & MU BKR TST PKR ASSEMBLY. (2.00hrs) RIH W/ TST PKR ASSEMBLY TO 8738' (ABOVE 5" LINER). (1.00hrs) SLIP & CUT DRILL LINE, 100'. (1.50hrs) RIH SLOW IN 5" LINER TO 10,228' DPM & SET PKR. (3.00hrs) SAFETY MTNG, TST SURF LINES 6000 PSI, PUMP DIESEL & FIW, CLOSE TOOL, CLOSE PIPE RAMS, RETEST LINES TO 10,000 PSI. BD PERFS W/DIESEL, FM BROKE DN @ 8300 PSI. PUMPED INTO FM @ 7300 PSI W/ 4.9 BPM, SD PUMPS. ISIP = 6000 PSI - FM BLED TO 1270 PSI IN 30 MIN, HAD 1000 PSI ON BK SIDE WHILE INJECTING. (0.50hrs) UNSEAT PKR & PUMP DRY- JOB. (4.50hrs) POOH SLOW THRU 5" LINER. (1.00hrs) ND BELL NIPPLE & NU SHOOTING FLANGE. (1.00hrs) RU SWS ON SHOOTING FLANGE. (0.50hrs) HOLD SAFETY MEETING W/ PRODUCTION, ESTABLISH RADIO SILENCE. (0.75hrs) ARM E-LINE W/ FASDRILL SETTING TOOL & TST LUBRICATOR TO 2000 PSI. (0.75hrs) MAKING UP FIRING HEAD TO FASDRILL, RE-TAPPING SET SCREW THREADS ON FASDRILL. (1.00hrs) RIH W/ FASDRILL ON E-LINE. DMC:$-0- CMC:$238025 DWC:$224639 CWC:$3900894 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 11/28/00 DFS: 73 OART: MD: 10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS:0/:0 PH: 0.0 WL: 0.0 CL:18000. TIME DIST: (2.50hrs) FINISH RIH W/ FASDRILL ON E-LINE, LOG & LOCATE & SET 8 10220' WLM - POOH & R/DN SWS. (1.00hrs) NIP/DN SHOOTING FLANGE & NIP/UP FLOW NIPPLE.(1.00hrs) M/U PKR ASS'BLY. (3.50hrs) RIH W/ TST PKR & SET a 9912'. (4.00hrs) HOLD SAFETY MEETING - R/U BJ, TST LINES 7000 PSI - BRK/DN PERFS W/ DIESEL - PUMP 6 BBLS 8 5100 PSI 8 4.7 BPM - CSG PRESS INC'D TO 1200 PSI - S/DN DUE TO FM COMMUNICATING BEHIND PIPE. (1.50hrs) REL PKR & POOH TO TOP OF PERFS & RE-SET PKR 8 9200' DPM & TST BK/SIDE TO 1000 PSI - HELD (PKR GOOD)- RELEASE PKR & RIH & RE-SET 8 9611'. (4.50hrs) RIH & RE-SET PKR 8 9611' DPM - R/UN BJ & HEAT H20 TO 100 DEG F - HOLD SAFETY MEETING, TST SURF LINES TO 10000 PSI - OK - PUMPED/INTO HK, HN PERFS W/ DIESEL W/ 4900 PSI - PRESS/INC'D TO 5379' 8 6.7 BPM - S/DN PUMPS RECORD ISIP OF 3000 PSI & BLED TO 0 PSI IN 15 MIN. (0.50hrs) MONITOR WELL & INSTALL GUIDE BELL ON T/DRILVE. (3.50hrs)POOH W/ PKR ASS'BLY. (1.00hrs) NIP/DN BELL NIPPLE & NIPPLE/UP SHOOTING FLANGE.(1.00hrs) R/U SWS E-LINE -SAFETY MTNG - RADIO SILENCE. (hrs) NOTE: REPORT LATE DUE TO RADIO SILENCE - PHONES/OFF. DMC:$-0- CMC:$238025 DWC:$34144 CWC:$3935038 11/29/00 DFS: 74 OART: MD:10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV:' 0 YP: 0 GELS: 0/: 0 PH: 0.0 WL: 0.0 CL:18000. TIME DIST: (3.50hrs) RIH W/ FASDRILL ON E-LINE, LOG & LOCATE & SET 89611' WLM & POOH. (0.50hrs) RD E-LINE . (1.00hrs) ND SHOOTING FLANGE & NU BELL NIPPLE. (1.00hrs) MU TST PKR ASSEMBLY. (4.50hrs) RIH W/ PKR ASSEMBLY. (2.00hrs) SET PKR 8 9200' DPM. R/U BJ & TST SURF LINES TO 6000 PSI,CIRCULATE 57 BBLS DIESEL, CLOSE TOOL & DISPLACE DIESEL INTO HC & HE PERFS 8 5173 PSI & 4.2 BPM W/ 300 PSI HELD ON BK/SIDE. SHUT DN PUMPS - ISIP = 3800 PSI. BLED TO 1815 PSI IN 30 MIN. (1.50hrs) MONITOR WELL, BJ CLEAN/UP, OPEN TOOL, PUMP DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIFLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY DRY JOB, RD HEAD PIN & INSTALL TOP / DRIVE GUIDE & GRABBER & UNSEAT TST PKR. (4.00hrs) POOH. (1.00hrs) SERVICE TOP /. DRIVE & IRON ROUGHNECK. (1.50hrs) LD TST PKR, PU & MU MI.LL / MOTOR FASDRILL CLEAN /OUT ASSEMBLY. (3.50hrs) RIH W/ FASDRILL CLEAN OUT ASSEMBLY. DMC:$-0- CMC:$238025 DWC:$57571 CWC:$3992609 11/30/00 DFS: 75 OART: LAYING DN DP MD:10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS: 0/: 0 PH: 0.0 WL: 0.0 CL:18000 TIME DIST: (1.00hrs) DRILL UP FASDRIL @ 9611'. (0.50hrs) RIH TO 10,220'o (2.50hrs) DRILL UP FASDRIL @ 10,220'. (0.50hrs) RIH TO 10,698'. (3.50hrs) PUMP HI VIS SWEEP, CIRC BTMS UP. (6.00hrs) WASH & BACK REAM TO TOP OF 7" LINER, ATTEMPTING TO CLEAN UP WELL F/ COMPL. (1.50hrs) RIH TO 10,698'. (4.00hrs) CLEAN TRIP TANK, PUMP HI VIS SWEEP DISPLACE W/ CLEAN FIW. (3.00hrs) POH W/ 3 1/2" DP STD BACK. (1.50hrs) LD 2 7/8" DP. DMC: $-0- CMC: $238025 DWC: $74383 CWC: $4066992 12/01/00 DFS: 76 OART:RUNNING 2 7/8 6.5# L80 8RD ABMOD TBG. MD :10750 MADE: 0 FMN: MW: 8.6 VISC: 0 PV:0 YP: 0 GELS: 0/:0 PH: 0.0 WL: 0.0 CL:iS000. TIME DIST: (1.00hrs) N/D FLOW LINE N/U SHOOTING FLANGE° (4o00hrs) RUN & SET BAKER DB PROD PKR ON SCHLUMBERGER WL, TOP OF PKR @ 8820', WLEG @ 8854'. (1.00hrs) RD SCHLUMBERGER. (1.50hrs) ND SHOOTING FLANGE, NU FLOW LINE. (1.00hrs) CHANGE PIPE RAMS TO 2 7/8". (1.50hrs) PULL WEAR RING, TEST BOP TO 2500 PSI. (14.00hrs) R/U & RUN 2 7/8 6.5# L80 8RD ABMOD TBG. RUN TBG @ 6500'. DMC:$-0- CMC:$238025 DWC:$27785 CWC:$4094777 DAILY OPEP~%TIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE 0:2000172 ACCOUNTING #: 62306 ESTIPLATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 12/02/00 DFS: 77 OART: MD:10750 FLADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS: 0/: 0 PH: 0.0 WL:0.0 CL:18000. TIME DIST: (4.50hrs) RUN 273 JTS 2 7/8 6.50 LB0 8RD ABMOD TBG TO TOP OF PKR @ 8752' (TBG MEASUREMENT) WIRELINE MEASUREMENT 8820'. (0.50hrs) STING INTO PKR PRESSURE TEST TBG TO 1000 PSI (HELD). (1.00hrs) SCREW INTO TBG W/ TOP DRIVE CIR TBG VOLUME. (4.00hrs) SPACE OUT TBG, MU TBG HANGER, PT CONTROL LINE TO 5000 PSI, LAND TBG - (W/ "GBH-22" LOCATOR @ 8748.94', 1JT TBG - X NIPPLE @ 8716.42', 1 JT TBG - GLM # 10 @ 8673.55', 12 JTS TBG - GLM # 9 @ 8278.23', 13 JTS TBG - GLM # 8 @ 7851.32', 14 JTS TBG - GLM # 7 @ 7392.76' , 14 JTS TBG - GLM # 6 @ 6937.36' , 18 JTS TBG - GLM # 5 @ 6353.76', 22 JTS TBG - GLM # 4 @ 5644.41', 32 JTS TBG - GLM # 3 @ 4627.27', 39 JTS TBG - GLM # 2 @ 3405.24', 49 JTS TBG - GLM # 1 @ 1873.60', 52 JTS TBG - BAKER TE-5 SSSV @ 247.20', 6 JTS TBG, 2 PUPS, XO 2 7/8 8RD PIN TO 2 7/8 RTS 6 BOX - RTS 6 PUP JT - CAMRON HANGER PH-6 BOX BY BOX) PT TBG PKR & SEAL ASSY TO 1000 PSI. (6.50hrs) INSTALL B?V ND BOP'S. (2.00hrs) NU TREE. (1.00hrs) BLOW DN 4 & 6" CHOKE LINES, DRAWWORKS & WTR LINES. (4.50hrs) TEAR OUT 4 & 6" LINES FOR CHOKE & BRAKE WTR LINES, PULL CABLES OUT OF KATO GEN & CLEAR DECK FOR RIG MOVE. DMC:$-0-. CMC:$238025 DWC:$105215 CWC:$4199993 12/03/00 DFS: 78 OART: MD:10750 F~ADE: 0 FMN: MW: 8.6 VISC: 0 PV: 0 YP: 0 GELS:0/:0 PH: 0.0 WL: 0.0 CL:18000. TIME DIST: (8.00hrs) CLEAN PITS, LOAD OUT BOAT, CLEAR DECKS, PULL CABLES. (3.00hrs) NU & TEST TREE . (1.00hrs) PRESSURE UP ON TBG, SHEAR OUT PLUG WITH 1200 PSI (FIW). RELEASE RIG F/ A 34-11LS2 6:00 P.M., 12/02/2000. DMC:$-0- CMC:$238025 DWC:$74498 CWC:$4274490 DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11 LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 12/03/00 12/04/00 12/05/00 12/06/00 12/07/00 12/08/00 12/09/00 12/10/00 12/11/00 12/12/00 Took well out of test separator @ 2300 hrs. 12/02/00. Put Well on Gas Lift. GL 1 hr. Inject 300 MCF/Do TP 180#, CP 840#. GL 24 hrs Recv'd 475 BF. Inject 1050 MCF/D. TP 100~. CP 650#. GL 24 hrs. Rcv'd 138 BF, 1120 MCF/D. 30% wtr cut. TP 100#, CP 620#. GL 24 hrs. Rcv'd 130 BF, 24% wtr cut. Injected 1050 MCF. TP 100#, CP 590#. GL 24 hrs. Rcv'd 104 BF, 20-34% wtr cut (avg 24%). Injected 911 MCFo TP 100#, CP 560#. Well is heading. GL 24 hrs. Rcv'd 101 BF, 24% wtr cut. Injected 939 MCF. TP 100#, CP 560#. GL 24 hrs. Rcv'd 100 BF, 25% wtr cut. Injected 910 MCF. TP 95#, CP 560#. GL 24 hrs. Rcv'd 96 BF, 18% wtr cut. Injected 982 MCF. TP 100#, CP 590#. GL 24 hrs. Rcv'd 96 BF, 18% wtr cut. Injected 980 MCF. TP 100#, CP 590#° GL 24 hrs. Rcv'd 92 BF, 22% wtr cut. Injected 983 MCF. TP 100#, CP 590#. RU WL equip & press tst lubricator. RIH w/1.70# gauge ring° Tag'd btm @ 10660' (wlm), 10698' (md)° POH. No problems going in hole. Will run FBHP & temp survey today° DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 12/13/00 12/14/00 12/15/00 12/16/00 12/17/00 12/18/00 12/19/00 12/20/00 12/21/00 12/22/00 12/23/00 12/24/00 No test. RU SL. Ran FBHP temp srvy. Following measure- ments made at btm of HK, 9925' MD. FBHP 781 psi, FBHT 160.4°F. SI well. After 1 hr SI, BHP 1119 psi, 160.5°F. After a 4 hr SI BHP 1213 psi, 160.5°F. Max press 1434 psi @ 10540' MD (9516' TVD) & max temp 164.3°F. POH. RD WL. Rtn well to prod. GL off btm orifice. GL 24 hrs. 74 BO, 16 BW, 159 MCF. TP 100#, CP 610#. Inject 1038 MCF. Will begin tst'g every other day to tst other wells. GL 24 hrs. 70 BO, 18 BW, 171 MCF. TP 85#, CP 610#. Inject 1025 MCF. GL 24 hrs. No test. Inj 1032 MCFo TP 90#, CP 620#. GL 24 hrs. Test. 77 BO, 13 BW, 142 MCF. Inj 1032 MCF. TP 80#, CP 620#. GL 24 hrs. No test. Inj 1020 MCF. TP 90#, CP 620#. GL 24 hrs. No test. Inj 1020 MCF. TP 90#, CP 620#. GL 24 hrs. Test. 83 BO, 5 BW, 77 MCF. Inj 1020 MCF. TP 90#, CP 620#. GL 24 hrs. No Test. Inj 1033 MCF. TP 90#, CP 620#. GL 24 hrso Test. 86 BO, 4 BW, 155 MCF. Inj 1041 MCF. TP 100#, CP 630#. GL 24 hrs. No Test. Inj 1032 MCF. TP 100#, CP 630~. GL 24 hrs. No Test. Inj 1058 MCF. TP 85#, CP 640~. DAILY OPERATIONS REPORT WESTERN DISTRICT WELL NAME: MGS A34-11LS2 AFE #: 2000172 ACCOUNTING #: 62306 ESTIMATED TD: PBTD: COUNTY/STATE: Kenai, AK CLASSIFICATION: DRILL & COMPLETE 10,530' (9,616')HEMLOCK SIDETRACK, SINGLE TUBING WELL. DESCRIPTION: MIDDLE GROUND SHOALS PLATFORM A CONTRACTOR: OPERATOR: CROSS TIMBERS OPERATING COMPANY 12/25/00 12/26/00 12/27/00 12/28/00 12/29/00 GL 24 hrs. Test. 86 BO, 4 BW, 157 MCF. Inj 1006 MCF. TP 95#, CP 650#° GL 24 hrs. No Test. Inj 1021MCF. TP 90#, CP 640#. GL 24 hrs. No Test. Inj 1007 MCFo TP 90#, CP 630#° GL 24 hrs. No Test. Inj 1011 MCF. TP 90#, CP 630#. GL 24 hrs. No Test. Inj 897 MCF. TP 90#, CP 580#. Temporarily Drop Until Further Activity ALASILA OIL AND GAS CONSERVATION COPlPIISSION TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3] PHONE: (907) 279-1433 FAX: (907) 276-7542 Susan I. Sudduth Sr. Engineering Technician Cross Timbers Operating Company 210 Park Avenue, Ste 2350 Oklahoma, OK 73102 Re: Middle Ground Shoal A34-11LS2 Cross Timbers Operating Company Permit No: 200-089 Sur Loc: 1624'FSL & 430'FEL, Sec. 11-SN-13W, SM Btmhole Loc. 561'FNL & 2286'FEL, Sec. 14-8N-13W, SM Dear Ms. Sudduth: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately '24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission at 279-1433. Dkniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this 2 0"r--s day of June, 2000 dlffEnclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ALASKA OIL AND GAS CONSERVATION CO~LSllSSION TONY KNOWLES, GCVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 44.64 R¢~ The Application of Cross Timbers Oil Company for the Drilling of the MGS A34-11LS2 Well in the Middle Ground Shoal Field Mr. Dan C. Foland, CPL Division Landman- Eastern U.S., Alaska Cross Timbers Oil Company 810 Houston Street, SUite 2000 Fort Worth, Texas 76102-6298 Dear Mr. Foland: An application, dated June 5, 2000, requested approval to drill the MGS A34-11LS2 well, which would be the fourth completion in the SE ¼ Section 11, TSN, R13W, SM and the fourth completion in the NE aA Section 14, T8N, R13W, SM. It is understood by the Alaska Oil and Gas Conservation Commission (Commission) that the drilling and completion of the well will increase recovery of reserves from this structurally complex portion of the Middle Ground Shoal Field. The Commission hereby authorized drilling and completion of the MGS A34-11LS2 well. pursuant to Rule 6 (d) of Conservation Order No. 44. DONE in Anchorage, Alaska this day June ~ , 2000. Cammy Oec~r Commissioner Commissioner BY ORDER OF THE COMMISSION AMENDED I~ STATE OF ALASKA ~'_ ALASKA O AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1 Type of Request: [x] Abandon E, F & G Pool [ ] Suspend [ ] Alter Casing [ ] Repair Well [ ] Change ApDrovecl Program [ ] Operation Shutdown 2. Name of Operator Cross Timbers Operating Company 3. Address 210 Park Avenue. Ste. 2350, Oklahoma City, OK 73102 ] Plugging ] Pull Tubing ] Re- Enter Suspended Well 5. Type of well: [X] Development [ ] Exploratory [ ] Stratigraphic [ ] Service Time ExtensIon ( ] Perforate Vanance [ ] Other Sbmulate 6. Datum Elevation (DF or KB) 116' KB 17. Unit or Property Name Location of well at surface 1624' FSL & 430' FEL Sec. 11-8N-13W, S. M. At top of productive interval 469' FSL & 2367' FEL Sec. 11-SN-13W, S. M. At effective depth At total depth 561' FNL & 2286' FEL Sec. 14-SN-13W, S.M. Middle Ground Shoal 8. Well Number A34-11LS 9. Permit Number 95-88 0. APl Number 50-733-10084-02 1. Field and Pool MGS "G" Pool 12. Present well condition summary Total depth: measured 11,209 true vertical 9,823 Effective depth: measured 11.205 tr~"verti..cal 9.820 C asi ng , '"'~;ng'~th Structural ~ Conductor 370' Surface 1650' ~ Intermediate Production 6747' Liner 3998' 1397' 1811' feet feet feet feet Size 24" 13-3/8" 9-518" 3-112" Plugs (measured) Junk (measured) DUPLICATE Cemented MD TVD -- 370' 370' 1900 sx 1650' 1640.8' 1100 sx 6747' 6308' 2200 sx 10325' 9297' 310 sx 9472' 8776' Slotted Liner 11205' 9820' Perforation depth: measured True vertical NA - Slotted Liner Tubing (size, grade and measured depth) 2-718" 6.5# LS01NS0 8rd EUE. EOT (~ 7479' , 2 7 2000 Packers and SSSV (type and measured depth) 13. Attachments [X] Description of Sumary Proposal [X] Detailed Operations Program [*] BOP Sketch "On file w/AOGCC 14. Estimated date for commencing operation 15. 7~9~00 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Date Approved Status of well classification as: [X] Oil [ ] Gas Service Prepared By Name/Number: [] Suspended 17. I hereby certify that ~ f~is~ to the best of my knowledge ~.~~ \~ Title Susan I. Sudduth, Sr. Engineering Technician sag ..... ~, Ph (405)319-3213 Commission Use Only Conditions of Approval: Notify Commission so representative may witness Plug integrity ~ BOl~est ~ Location Clearance Mechanical Integrity Test ~ Subsequent form required 10- Date: 22-Jun-O0 IApproval No._.~Od' -~..~ Approved by order of the Commission ORIGINAL SIGNED BY Form 10-403 Rev. 06/15/88 D '1 aylor ,Seamount Commissioner Subrr~t In T~plicate r, o. Cross Timbers Operating Company MGS A34-1 ILS2 AMENDED Sidetrack Procedure Move rig over well. Install BPV, N/D tree, N/U BOPE. Test BOPE to 5,000 psi. P/U on tubing, pull packer loose and displace well to 9.0 ppg water-base drilling fluid POH with tubing, checking for NORM while POH. L/D tubing and completion jewelry and send to shore. 'P/U 3-1/2" drill pipe, RIH and abandon 3-1/2" slotted liner as tbllows (Notify the AOGCC at least 24 hfs in advance): Set a cement retainer at 9,320'MD in the 5" liner and squeeze sufficient cement below it to fill the 5" liner and 3-1/2" slotted liner to l 1,209'MD (5" liner shoe) plus an additional I00' of 3-1/2" slotted liner to 9,572'MD. Pull out of retainer and place a 75' cement cap on top. Pull up, reverse out and WOC. Weight-test cement plug with 15,000#. Abandon the perforations at 7,587' - 8,010'MD by setting a balanced cement plug from 7,450' to 8,120'MD. Puli up, reverse out and WOC. Weight-test cement plug with 15,000#. POH. RIH with 9-5/8" one-trip whipstock. Orient and set whipstock at 5,650'MD and mill an 8-1/2" window in 9-5/8" casing. Directionally drill 8-1/2" hole t¥om 5,650' to 9,050'MD. Run and cement 7", 26#, N-80 BTC liner at 9,020'MD with TOL at approximately 5,350'MD (-300' of lap). Clean out liner to float collar and pressure-test well to 3,000 psi for 30 minutes Drill out liner shoe and displace well to 8.1 ppg oil-base drilling fluid Drill approximately 20' of new hole and conduct leak-off test Directionally drill 6" hole from 9,020' to 10,540'MD. RECE.,¥ED JUN 2 7 2000 Alaska Oil & Gas Cons. Commission And~or~e Run and cement 5", 17.95#, L-80, STL liner at 10,526'MD with TOL at approximately 8,700' (--300' of lap). Clean out liner and test liner lap to 3,000 psi for 30 minutes. Displace well to filtered Inlet water Run 2-3/8", 4.7#, N-80, 8rd EUE completion with gas lift design. Pickle inside of tubing with HCl/xylene and circulate inhibited filtered Inlet water into annulus before setting packer. N/D BOPE, N/U tree. Test tree to 5,000 psi. Release rig REOE ¢ED J!/~,I 2 7 2000 · Alaska Oil& Gas Cons. Commission .~chorage o o o ~=~ Oo ~---=0 o OD. 0 o o 0 't Cross Timbers Oil Company Dan C. Fola~"o,i- CPL Division Landman - Eastern U.S., Alaska (817) 885-2337 Fax (817) 885-2224 dan_foland@crosstimbers, corn June 5,2000 VIA FEDERAL EXPRESS Mr. Robert Christenson, Chairman State of Alaska Alaska Oil & Gas Consen,ation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Re: Request for administrative approval to drill, complete and produce the Middle Ground Shoal No. A34-11LS2 well in the Middle Ground Shoal. Field Dear Chai,nnan" ' , Chrtstenson: Pursuant to Rule 6 (d) of Alaska Conservation Order No. 44 for the Middle Ground Shoal Field, Cross Timbers Oil Company, as operator, hereby respectfully requests administrative approval to drill, complete and produce the Middle Ground Shoal No. A34-1 ILS2. The A34-11LS2 is not adjacent to a lease bmmdary and is to be drilled to the steeply dipping west flank of the reservoir. Structural complexities in this portion of the field require producers be drilled at less than 80-acre spacing to insure adequate drainage. After abandonment of the A34-11LS and completion of the side-tract, this well will be the third producer in the NE/4 of Section 14-T8N-RI3W SM and the fourth producer in the SE/4 of Section 11-T8N-R13W SM. Enclosed herewith in quadruplicate is Cross Timbers' Application for Permit to Drill the subject well. Sincerely, C. Dan C. Foland RECEIVED JUN 06 2000 Alaska 0il & Gas Cons. Commission Anchorage 810 Houston St., Suite 2000, Fort Worth, Texas 76102-6298 (817) 870-2800, Fax (817) 870-1671 www, crosstimbers.com AOGCC02.doc ~ Cross Timbers Operating Company May 31, 2000 RECEIVED , ,-;:'~ 0 6 2000 Mr. Robert Christenson, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Alaska Oi! & Gas Con, s. Commission ~chors<je Re: Application for Permit to Drill A34-11LS2 Sidetrack Kenai County, Cook Inlet Dear Commissioner Christenson: Cross Timbers Operating Company hereby applies for a Permit to Drill an offshore development well from Platform "C" in the Middle Ground Shoal Field of Cook Inlet. The well is planned as the second sidetrack of the existing A34-11 wellbore in order to penetrate and develop an un-drained portion of the Hemlock conglomerate in the vicinity of Platform "C" The existing sidetrack will be abandoned per AOGCC regulations before this sidetrack is commenced. After abandoning the existing Hemlock completion, the well will be sidetracked in the 95/8'' casing and a 7" intermediate liner set from the kick-off point to the top of the Hemlock formation. After penetrating the Hemlock HC through HR intervals, a 5" production liner will be cemented in place and the well completed as an oil producer with 28/8'' tubing and gas lift design. Please find attached information as required by 20 AAC 25.005 (a) and (¢) for your review. Pertinent information attached to this application includes the following: 1) 2) 3) 4) 5) 6) Form 10-401 application for Permit to Drill per 20 AAC 25.005 (a); Fee of $100.00 (Ck N° 1 694) payable to the State of Alaska per 20 AAC 25.005 (c)(1); A directional plat showing the well's proposed surface and bottomhole locations per 20 AAC 25.050(c)(2); Directional plots and proximity calculations in accordance with the requirements of 20 AAC 25.050; Diagrams and descriptions of the BOP equipment to be used as required by20 AAC 25.035(a)(1) and (b) were previously submitted to your office and are on file; A complete proposed casing and cementing program is attached as per 20 AAC 25,030. A wellbore schematic is also attached, visually depicting the proposed well and completion design; 210 Park Avenue, Suite 2350, Oklahoma City, Oklahoma 73102-5605 (405) 232-4011 Fax (405) 232-5538 Mr. Robert Christenson, Chairman 05/31/00 Page Two 7) 8) 9) 10) 11) The drilling fluid program, in addition to the requirements of 20 AAC 25.033 are attached; A copy of the proposed drilling program is attached; Cross Timbers does not anticipate the presence of H2S in the formation to be encountered in this well. However, H2S monitoring equipment will be functioning on the rig at all times during sidetracking, drilling and completion operations; While this well is considered to be a development well, basic mud logging will be performed while drilling to aid in tracking the location, thickness and quality Of the intervals penetrated; and The following are Cross Timber's designated contract for reporting responsibilities to the Commission: 1) Completion Report (20 AAC 25.070) Susan Sudduth, Sr. Eng. Tech. (405)319-3213 2) Geologic Data and Logs Mike Langeler, Senior Geologist (20 AAC 25.071 ) (81 7)885-2581 If you have any questions or require additional information, please contact me at the number listed above or Bill Penrose at (907)258-3446. Sincerely, CROSS TIMBERS OPERATING cOMpANY Susan I. Sudduth Senior Engineering Technician Drilling Department Mid-Continent Division s/sis Enclosures CC: Bill Penrose Doug Marshall Charles Pope RECEIVED 0 6 2000 Alaska Oil & Gas Cons. Commission Anchor~e ' , STATE OF ALASKA ALASKa'" 'L AND GAS CONSERVATION C~' SSION PERMIT TO DRILL 20 AAC 25.005 la. Typeofwork [ ]Drill [X]Redrill lb. Typeofwell [ ]Service [ ] Development Gas IX] Sin§leZone [ ] MultipleZonel [ ] Re-Entry [ ] Deepen [ ] Exploratory [ ] Stratigraphic Test IX] Development Oil 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool CROSS TIMBERS OPERATING COMPANY RKB 116' ASL 3. Address 6. Property Designation ~ MGS "G" Pool 210 PARK AVENUE, STE. 2350, OKLAHOMA CITY, OK 73102 ADL 18756 4. Location of well at surface 7. Unit or Property Name /" 11. Type Bond (See 20 AAC 25.025) 1624' FSL & 430' FEL Sec. 11-SN-13W S.M. Middle Ground Shoal Blanket At top of productive interval 8. Well Number Number 469' FSL & 2367' FEL Sec. 11-SN-13W S.M. A34-11LS2 1363004 At total depth 9. Approximate spud date Amount 561' FNL & 2286" FEL Sec. 14-8N-13W S.M. 07~09~2000 $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (M D and TVD) 2,994'I 570' from a33-11LS ~ top of Hemlock 3746 ac 10,530' MKD & 9,616' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 5650' Maximum Hole Angle 43 degrees Maximum surface 3289 psis , At total depth (TVD) 4346 psis 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stagedata) 8-112" 7" 26 N-80 BTC 3700' 5350' 5035' 9020' 8516' 560 sx Class "G" cement 6" 5" 17.95 L-80 STL 1826' 8700' 8170' 10526' 9616' 142 sx Class "G" cement 19. To be completed for Redrill, Re-entry, and Deepen OperationS.Present well condition summary0 R I ]NA L ,rUN 0 6 2000 Total depth: measured 11,209 feet Plugs (measured) ' true vertical. 9823 feet Effective depth: measured 11,205 feet Junk (measured)A a k8 0il & Gas Cons. Commission true vertical 9820 feet Casing Length Size Cemented MD TVD Structural Conductor 370' 24" 370' 370' Surface 1650' 13-318" 1900 sx 1650 1640.8' Intermediate Production 6747' 9-518" 1100 sx 6747' 6308' Liner 10325' 7" 2200 sx 6427'-10325' 6010'-9297' 9472' 5" 310 sx 8075'-9472' 7575'-8776' 11205' 3-112" Slotted Liner 9394'.11205' 8719-9820' Perforation depth: measured NA - Slotted Liner true vertical 20. Attachments [X] Filing Fee [ ] Property Plat [X] BOP Sketch [ ] Diverter Sketch [X] Drilling Program [X] Drilling Fluid Program [ ] Time vs Depth Plot [ ] Refraction Analysis [ ] Seabed Report [ ] 20AA025.050 Req. Contact Engineer Name/Number: Prepared By Name/Number: 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed~... ~ ~ J/~/,~ ] ~Title Susan I. Sudduth, Sr. Engineering Technician Date 05~30~00 Commission Use Only Permit Number _ ~x::~ APl Number/ ~:~/.~, I See cover letter for other requirements Conditions ofApprovah Samples Required: [] Yes '~'No '/ Mud~.og Required []_Yes ])~No Hydrogen Sulfide Measures: .~"Yes [ ] No Directional Survey Req'd ,~Yes [ ] No Required Working Pressure for BOPE: [ ]2M, [ ]3M, [~5M, [ ] 10M, [ ] 15M Other: ORIGINAL SIGNED BY by order of ~_/~~ .Approved By 13 Tavlor Seamount Commissioner the commission Date Form 10-401 Rev. 12-01-85 Su[ 4icate ~]:'~'.,.~ '.'."":' ,. "~ ,, .~'.~ ~,~,., '":"'~:':'"'~"~'"'~'"~'~.~.~'",':~'":'~"~'~"~ ,,..,...I.. ? ~,..,.,.., ..~,~o,~..~.~.~ '"'~'~"'~,~"~"~':"~'~::~..""'"'~""." ,'''''''':':',''?;'.'''' '"' ''''??: :"~?'?~' ~.:~o.~,,~~.. ~.' :::~: :' ': :" ::"' ::. '~':::~: .........' :' ..... :: ::,, ::...,,,. :::', :: ,.,:: ::' ..~ .:.: ': ,¥..,.. '"'"': ,~ ,,.: .." '''.' :' ?.......'"' ..., :'"' ,.... ::., ":,': .... :" ,. ,~, "' :'.... ':": ,.: :'" ,: :. '~' ,..~ '~: .. :...: ~. ~,~. :' ,. 1f' ¥, '~"~'~"]l"~"'"'?'~&~"?"l:':'?'':!~'':°~'~''''c~''°'~''.~''°~'''' '"'""' '."':' ":" """' '"'=""~'".."""?""?'"';' ":' "'""::'""".'"'." ""'"" ."' ..... :':' "' :' '"."'""" '" '"' :, ":' '."' ' ' ""' "' '¥' ':' :::' :?': ::: "~'"': '" '.~ t':; ':"¥:"$";'"""~? :!:'~''''' ''''?~: ':?~ '"'?'~:?: ~:'~ :""'~""" '"":';' "":"~' "':'" ~:'': ~"""'"'"'?':"':' "":":':' ~':¥'":'"""' '''~' .... :!2"':"""'"'" '?''':'''':''' "'"" :'''''':~ ''':'~ '"" ...... '"' :' '"' ':: :' ':' '~ ?'' "': ....... :" ? ': ~11~.:: . '~.';.~..":.'' :' '1'";:" :?:~':~ .:~.::'.'~Jl.:l: .~i'I~ i'I: "..:" '~1 :.~' :.". :'" 1. :'~..: '': '. :.":':'" 1:':: :' ~ I;~. ~' ":~. '~:~"1~ "',~'~,"~"~'"~"~ "~1::~'~'0~.'~, '' "'~,''~ ~'~ "~ .' :~1~"~'~ '~;~ "' :'.:''' ." .'~ .:: ." . "~ : ." .1.. :' ..: :'iI iiii: II~ I: I .i~iI"I .II : iii· :ii~ ~I :"I I. Ii:: "I." i I 11 I. :: I' ii ~: I II II I"I .I ~" I II ...... ' 'II II ,' ::i I i" i ":I "I I~ I .... : i. I~I :~ ~?,t1:!::.:?;~.::'. ::"':" :."::":':':?,I.::: ~i.'.';".'i'... :'.':":.: .' ".:;'.'.'".:.'::.':::..:.i:i; ~;~.~i~:i.:i:~.~:~'~:::'..:'.S'~'~':~'~::'::~:::..::::i::.':..i': ?:':::: :':~ ""....'.'.:' ... ::.:".::".: :: .::'i'.''* "::' '":::".'::':"::.:'..'::.".'"..':"i" ":.;:'.......:'. ':": ...'.' ': ';:.~;'::. ":': ...:.:.".'. ",;.'.:::~ (.:...:".:.'?.,.':', .'.!. :.,.'.;'::' ;; I]1::::."":.:'.' i:::.': ":'.. ::.:: '.'"'. :: ".:.:'::": "':'.:: :".'::'"'. '.:"'.':.:",~.',:.~:~: :.:i::~'"'q':.~' ~,"':':.:!. :~i~i:::".~ii~::i:.', :~.o':°.:'°':0 .~.'~':::~":i:='::..:: .:: ~.:.::.~:.s.: ::: ~'i:,:.,;::o:~.:~..:.,~..~..~',:.~.:.:~:,','~ :,' :'"..:' ':" .::::...':.". :.:..'.:.'"' ~,i..,:: · ..... '. ' .' ' :", ....... ' .'.. ....... ' ....... , :, '! .... ','.,' ,'. ",,'.' .... ".' ,, :' .. "',, ' ..... ..' "...,!',':..,.'".' _." ' ...", .,. , ". :,,' ','. ', '...'.'." :,...,',.." ',' .., .' ~/.~,, '":.,,,'.',.'... '., ,' , .':: ..~,,.~.'! :,'.,'- :, .. i MIDDLE GROUND SHOAL WELL N= A34-11 LS2 WELL PROGRAM The Middle Ground Shoal (MGS) A34-11LS2 will be a re-drill of the existing well A34-11LS. The objective is the Hemlock reservoir. The current perforations will be isolated using a cement retainer at 9,320' MD and a cement plug from + 9,572' to 9,245' MD. The well will be directionally drilled out of the existing 9%" casing to 10,530' MD (9,616' TVD). Kick off point will be at 5,650' MD (5,300' TVD). The well will be drilled to a depth of 9,020' MD (8,516' TVD) and a 7" liner cemented in place. A 61/8.' hole will be drilled to a depth of 10,530' MD (9,616' TVD) and a 5" liner cemented in place. The Hemlock will be perforated and produced. Cross Timbers Operating Company Drilling Fluid Program, Pressure Calculations, and Drilling Area Risks MGS A34-11LS2 Sidetrack Drilling Fluid Properties: Density PV YP Funnel Vis Initial Gel 10 Minute Gel APl Filtrate pH % Solids Sidetrack depth to top of Hemlock 9.0 - 9.8 10 -16 24 - 32 45 - 85 5-15 10 - 30 4-8 9-11 3-8 Top of Hemlock to TD 8.1 - 8.8 25 - 35 10-18 75- 125 7-15 15 - 30 Oil Base Oil Base 5-9 Drilling Fluid System: fWo Derrick Shale Shakers esander, Desilter, Mud Cleaner entrifuge egasser Iit Level Indicator (Visual and Audio Alarms) rip Tank luid Flow Sensor luid Agitators Maximum Anticipated Surface Pressure: The maximum anticipated surface pressure (MASP) for both hole sections in this sidetrack will be lesser of the formation pore pressure (less a full gas column to the surface) or the formation fracture pressure at the last casing shoe (less a full gas column to the surface). Based on offset well data, the highest mud weight expected in the 8-1/2" hole section is 9.6 ppg (0.499 psi/ft) at the section 'ID of 8,516' TVD and the formation fracture pressure at the sidetrack depth of 5,300' TVD is 13.6 ppg EMW (0.707 psi/ft). Complete evacuation of the wellbore, except for a 0.11 psi/ft gas gradient, is assumed. 8-1/2" hole section MASP (pore pressure) = MASP (fro breakdown) = (8,516 ft)(0.499- O. 11) = 3,313 psi (5,300 t~)(0.707- 0.11)= 3,164 psi Therefore, MASP in the 8-1/2" hole section will be 3,164 psi and the BOPE will be routinely tested at their full rated working pressure of 5,000 psi. Again, based on offset well data. the highest mud weight expected in the 6" hole section is 8.7 ppg (0.452 psi/ft) at the section TD of 9,616' TVD in the target Hemlock Formation. The formation fracture pressure at the 7" casing shoe depth of 8,516' TVD is 14.6 ppg EMW (0.759 psi/R). Complete evacuation of the wellbore, except for a 0.11 psi/ft gas gradient, is assumed. 6" hole section MASP (pore pressure) MASP (fm breakdown) (9,616 ~)(0.452- O. 11) = 3,289 psi (8,516 f~)(0.759 - O. 11) = 5,527 psi Therefore, MASP in the 6" hole section will be 3,289 psi and the BOPE will be routinely tested at their full rated working pressure of 5,000 psi. Well Proximity Risk: The nearest wellbore to that of A34-11LS2 is A33-1 ILS. The wells are 630' from each other at a depth of 5,650' MD in A34-11LS2. Drilling Area Risks: The primary drilling risk in the A34-11LS2 area is that of stuck pipe in the coals of the Tyonek Formation above the producing Hemlock Formation. This risk will be countered in three ways: 1.) Drillers experienced at drilling the formations of the Cook Inlet Basin will be used. 2.) Bit selection will include those which experience a slower rate of penetration when entering coal beds, thus giving warning of coals being encountered and preventing the BHA from entering them until the coals can be reamed open. 3.) Casing will be set at the base of the Tyonek Formation, thus isolating the coals before drilling the target Hemlock Formation. As Middle Ground Shoal is a mature, densely drilled and thus well-characterized field, lost circulation and abnormal pressure problems are not anticipated. However, as safety precautions, sufficient LCM and mud weighting material will be kept on location to control unforeseen problems of these sorts. Disposal.of Muds and Cuttings: MGS Platform A has a dedicated Class II disposal well. All waste wellbore fluids will be injected down the disposal well as will cuttings after they are ground. ~ 0 Timbers 0il .Company MIDDLE GROUND SHOAL FI:ELD · ... '. '.'. ?.. ...---..K~'~"'"i------ -,r"'n'" 'nff-~k,(,-.....__..._ . ' ".'.'".~.. ...... ......Coo'k.'l"nlet, Alaska... ,., .,. ., WEST FLANK SIDETRACK .... '. .. . ........ ... ,..... '.,.i. A34'l,l.LS2 ". · ..... ' ' ':' .... " '"" " SEC.'S' 11-& 14,.T-8rN, R-13-W', ,, .. ., ... .... .. , ..... .. ".., . .... .,....' . . , ... '"" .. '" . ......... GEOLOGIST:. M;'La ~ELER ' DATE~' MARCH', .., .. .. . ., ... .. .. . . . ....... ... .... ':'" ""~" ::' ': '"" "'~ 8i0 Houston St., 'SUite 2000;. Fort.Worth'; Texas 761'02-6298 .... ' ...... ."' '' ','"" ' :'..-'. ' (817)870-2800,.'Fax.(817)870-1671. . '.': .'".:'.. · . .......,. .. . .... . . , '... . . ... .. · . . ·,. . . ... . .. ..'..... '.. · . . . . · ., . .. · . .. ·. , . . .. . . . · .. ... .,, · .,. . . , .. . . T 8 N WEST FLANK MIDDLE GROUND SHOAL FIELD Kenui County Offshore Cook Inlot, Alaska PROPOSED WEST FLANK SIDETRACK A34-11LS2 SEC'.S 11 &14, T-8-N, R-I~W WELLS POSTED T/HEMLOCK ~EOLO~I~E. M. LANGELI~ DATE: MARCH 2000 (=ross Timbers Oil Oompany / /COMI~I~OLEDW/ -7.623, '"~. "".. ~._ ~,\ ,/,../' / ~ .o .~o,..BW / ~F~I'-~- ~"~J~ . FAULT z~- ;~---'; ...... ' --- .- k'&'- .... 7 ....... ~ ............ :.~';.~," BLOCK 3 ~ ,,' / -'";',?':i "- /A/ .. , ..- ..; / ~1 ,' ~ .- /., ~ / /,.q'/ , ., , , ,, __ '~;' / ,..-'-- / ./ / ,, 11 C~ '~... ...... ,,-, / ~ ,~ ..: ,,, ~ / , ,'! ,, A34-11LS2 / I // / // PROPOS ED SIDETRACK TIHC ~1400 TVDSS ~ t / / I / I /~.~1%15,575 MBWII ,,' A~7[' / ' , , , 1 A33-11L8 -, / / -9,800 ~ /¥ (285 MBO/37 MBWJ~ / / / I · 214BOPDI10BWPD/ · I / I / ," ! I ~ I// I / ~ / I / % / I · I t I / % I / I ~ I / % / / ' ' I ~ I Ill ~ / / II / / ~ /I I/ // / II // A31-14 / ~ // / -7,791 I I / A34-11L8 // / COMMINGL~w/ / I "6g ~PD / 3 B~D / / / / 2,~9 MB° / 5~ M . . A31-14LW 144 M~I 9 MB~/ / ~_. -~ I I1.." ' -A"- · ,8~ / -- ~ I 74 B~ 112 B~D ~ ~ ~ -- ' I 187MBO 130 MBW ................ I MBO 12,~7 M~ ~ '1~,, ~ / zl ,, co~,.?, ~1 O~ '~?--. I BLOCK 2 ,/ ~///A33-14 I // ( 762 U~ ) / / / / / / / / EASTi FLANK I I I I / / / · / / I / / / / / / / / / / / / / / / 0 300' 60O' T 8 WEST FLANK W A33-11 -7,$92 COMMINGLE~ ._ Sr[1986 . 880 MBO t 8 MBW FAULT /___~~/k,q.O~ BLOCK 3 11 A33-11L8 -7,~ 645 2~Ot !0~ ~8 ~O~ 24~aWJ N // // lA34-11LS .9,651 69 I~)PO i 3 BWPD 144 MBO t 91dBW A31-14LW · . 14 ~-~4 ~'1 ~N~D~ ~1 ~110~ R t3 % % % t % % t t t TD FAULT BLOCK 2 % MIDDLE GROUND SHOAL FIELD Kenai County Offshore Cook Inlet, Alaska PROPOSED WEST FLANK SIDETRACK A34-11LS2 SEC'.$ tt &14. T-8-N, R-t~-W WELLS PO~TED T/HI;BLOCK FM. GEOLOGIST:. M. LANGEL~ DATE: MARCH 2000 / / A~1-14 -7.TUt COMM~.ED w/ _ A31-14LW 1994 2,38s ~o / 544 MaW · A32-14 -7,8~0 3.857 MBO ! 2,0;37 MI~./ Oross Timbers Oil Company / / I A43-11LW -7.62j~ / / / A~3-14 -7,957 si 25.798 tJBWl (762 MBO) A44-11 A -7.982 EAST FLANK 6017 WEST FLANK FAULT BLOCK 2 ASSUMED AVERAGE BED DIP: 75° KOP: 5,665' MD -$, t84' TVDSS 7" LINER ~ TIHC 9,020' MD ENTRY POINT lC HEMLOCK~ORMATIO~ ?, /! ,! ! ! ! ! ! ! ! ! ! ! ! EAST FLANK I I I I I I I I I I I / ,, TD POINT TD B/HR -9,$00' TVDSS 10, 526 MD MIDDLE GROUND SHOAL FIELD Kenai County Offshore Cook Inlet, Alaska A34-11LS2 SEC.'S 11 & 14, T-8-N, R-13-W PROPOSED SIDETRACK MAP VIEW PROPOSED WELL PATH 60'~ S 12° E 2400' LATERAL GEOLOGIST:. M. LANGELER DATE: Mi~RCH, 2000 C)ross Timbers Oil Company'--- ~., ! V ,j t4: 3~ 4056 728856 ( BAKER HUGI-ES {'CROSS Sfructuro F"ield TIMBERS · A34-11LS OPERATING : COOK INLET Locofion ' ALASKA 28O0 i <- We~t (feet) ztoo :~ooo ~ 50..0 ~ 200 ~oo ¢oo o KOP $~S$0 UO (5301 TVO) / 9500 ,~ / J 500 o soc Verffcal Section (feet) -> 4C0 · 0 I,od L SOC IZOG I1600 f - 2400 02/C,4/'2.0¢8 .1.~: ~5 SAKER HIJGI-ES(~ 'TEQ PAGE 83 CROSS TII'IBER$ OPERATING CO. A34-1[1_%. $1et #1 C00K INLET.ALASI(A ~aSure~: Incl in, Azlmuti~ Tr~e Yert O~th 9egree$ Degrees ~epth 5650.00 26.78 215.04 5300.51 5700.00 2'3.91. 237.05 5345.69 5800.00 1~.28 842.a4 6438.96 5895.Si t3.19 252.70 5530.89 6000.00 13.19 252.70 6500.0Q 13.19 252.70 El19.43 7000.00 13.19 252,70 ~[606.25 7500.00 13.19 252.7C 7093.06 ~000.00 13,19 252.76 1579.88 ~2.I9 I3.19 25~.70 7893,57 6400.00 13.85 232.83 7969.27 '8600,00 [6.67 21Z.52 8065.80 8600.00 20,85 199.02 6160.51 6700.00 25.73 190.14 ~$2.37 8800.00 3(].98 184.02 834C,36 8900.00 36.45 179.56 ~423.52 9000.00 42.04 L76.11 8500.94 9020,47 43.20 175.50 8516,00 9IO0.OQ 4:.3.20 175,60 8573.98 92~0.00 43.20 175.50 6546.67 9300.00 43.Z0 !75.50 8719,77 9400.00 43,20 175,50 8792.66 9600.00 43.20 1.75.50 8665.56 9~00.00 43,26 175.50 8936.45 9700.1)0 43.21 176.50 9011.34 9800,00 43.21 175,50 9084.23 gg00.00 43.~1 175.50 9157.12 10000.00 43,23. 175.~0 9230.(}3. 10100.00 43,23. 175.60 930Z,89 10200.00 43,21 I75.61 9375.78 10300.00 . 43.21 1~5.$1 9448.66 10400.00 43,21 175.51 9521,55 IOMO.O0 43,21 175.51 9594.43 105~9.59 43,2I 175.6I ,~516.00 FROPOSAL LL~'TI,~I~ Page 1 Your ref: p3245 Last revised: 1.Fee-2000 RECTANGULAR Oogleg C 0 OR O I 14 A l'E S Deg/lOOft 676.82 $ 1276.0C W ¢.00 687, 76S 1293.74 W 6. O0 705.~ $ 1324.72 W 6.00 716.0~ $ 13~d~. 47 W 6. O0 7~3.15 S 1371.~Z W O.OO 757, Oa S ].4~3.3.3 w 0.00 793..00 S 1589.03 W O,OO 624,93 S 1697.93 W 0.00 858.86 S 1806.04 W O.O0 880.71 S 1677. Ol W O. O0 868.99 S 1892.92 W 6.00 908.33 S 1910.18 W 6.00 937.Z7 S I923.70 W 6.00 975.49 S 1933.33 ~ 6.00 1022,58 S 1938.96 W 6.00 107~.01 S 1940.52 W 6.00 1141.18 $ 1938,01W 6.00 1~,55.00 S 1937,00 Id 6.00 1209.28' S 3.g~. 73"~ O. O0 1277.~ S 1927,36 ~ O,OO 1345.77 S 197,./. 99 W O. O0 1482.26 S 193.1.25 W O. O0 1550.51 $ 1905.88 V 0,00 1618.76 S 2900.51 W 0.00 1667.03. S 1895.15 ff 0,00 1755,27 S 1889.7B W 0.00 ~823.62 S 1884.41 ~t O. O0 1591.77 S 1879,05 I/ O. CO 1960,03 S 1.873.66 g 0.00 Vert Sect 134],. 19 KOP 136!.80 1395.73 1418.79 1438.93 1~5.29 1631.65 1728.02 1824,38 1903.138 · 1929.00 195}.81 1995.17 2034.70 2077.96 2124.47 :~134.35 8516 TVD - Entry Pt ~172.95 227{).02 2318.55 2367.09 2415.62 2464.~6 2512.70 256[.24 2609,78 2658,33 ' 2106.87 2028.29 S 1668.32 W 0.00 2755.41 Z095.54 S 1~67..95 W 0.00 28~3.98 I~164.66 S 1857.~ W 0.00 2~.51 2185,00 S 1856.00 W O.OO ~.87 9616 ~ - Exi~ ~ All ~ta 15 in feet unless otherwise stated. Coordlnal:es froa slot ~1 a~ W0 f~ rotary table. ~tt~ ~le distance is 2~.67 on azi~th ~0.35 d~r~s fr~ ~ell~ad Ye~l~l sectton ~s fr~ N 0.00 E 0.00 ~ azimuth ~0.36 ~gr~s. Calculattm u~s the mini~ ~veture ~d. P~e~d by Baker Hpg~ IN~Q .. -- CROSS T324Br, R~ OL)r, RAT:I2~G CO. ~ ~'LATIPOm4 L) R O Z~ O S A 1'. T. Z S T Z 1~G Bakor Hughea Your =e£ : A34-LLLS2 Version #L Our re£ : prop3873 D&te prXntod : 22-M~y-2000 Date ore&ted : ?-Feb-2000 Last revised : 22-M~y-2000 FieLd is oent=e~ on n60 50 4.803,v151 29 1X.941 Stz~oture Ks oentred on n60 46 36.826,v151 29 36.377 SLot Loo&tton if n60 47 44.823,vL5Z 29 45.042 SLot G=Xd ooozd~n~te, w ~ 2485842.846, Z 232790.269 SLot Loo~L ooozd~nAte8 a~o 6905.00 N 430.00 W P~o~eotLon t2~pe: aJ.a~h -Sone 4, Sphezo~d: CXazke - ~866 Reference North is ~zue North CROSS TIMB~R~ OPZRAT'rNG CO. A PLATFORM, A34-11T-52 M'id. dle Ground. Shoa/.s, Cook Tnlet:, Alaska Measured Znolin. Az~uth True Vert Depth Degrees DeHre~s Depth 5650.00 26.78 235.04 5300.51 5700.00 23.62 236.10 5345.71 5800.00 17.92 239.22 5439.11 5900.00 12.12 245.22 5535.66 5909.64 11.57 246.11 5545.10 RECTANGULAR COORDINATES PROPOSAL LZSTZNG Page 1 You~ ref : A34-11132 Version #1 Last rev4seA : 22-May-2000 DoHleg Vert Deg/100£t S~t 675.82 S 1276.00 W 0.00 389.45 KOE - Sidetrack Pt 687.90 S 1293.61 W 6.00 397.52 707.06 S 1323.62 W 6.00 409.86 719.34 S 1346.38 W 6.00 417.03 720.15 S 1348.19 W 6.00 417.44 En~ Drop/Turn 6000.00 11.57 246.11 5633.62 727.49 S 1364.75 W O.O0 421.10 6500.00 11.57 246.11 6123.46 768.09 S 1456.43 W 0.00 441.31 7000.00 11.57 246.11 6613.31 908.70 S 1548.10 W 0.00 461.52 7500.00 11.57 246.11 7103.15 849.30 S 1639.79 W 0.00 481.73 8000.00 11.57 246.11 7592.99 889,90 S 1731.45 W 0.00 501.94 8391.52 11.57 246.11 7976.56 921.70 S 1803.24 W 0.00 517.76 Begin Bld/Turn 8400.00 11.85 244.04 7984.87 922.42 S 1804.80 W 6.00 518.14 8500.00 16.07 226.08 8081.93 936.53 S 1824.02 W 6.00 527.85 8600.00 21.15 215.96 8176.70 960.76 S 1844.60 W 6.00 547.15 8700.00 26.60 209.73 8268.12 994.83 S 1866.32 W 6.00 575.83 8800.00 32.24 205.52 8355.20 1038.38 S 1888.94 W 6.00 613.59 8900.00 37.97 202.46 8436.98 1090.93 $ 1912.21 W 6.00 659.99 9000.00 43.77 200.10 8512.57 1151.90 S 1935.87 W 6.00 714.55 9004.74 44.05 200.00 8515.98 1154.99 S 1936.99 W 6.00 717.33 Tgt- Entry Point 9004.76 44.05 200.00 8516.00 1155.00 S 1937.00 W 6.00 717.34 A34-1115 Entry Pt Rvs4 Feb-2000 9100.00 43.54 195.94 8584.76 1217.67 S 1957.34 W 3.00 774.26 9200.00 43,16 191.60 8657,49 1284.31 8 1973.68 W 3.00 835.91 9300.00 42.95 187.22 8730.58 1351.62 S 1984.84 W 3.00 899.32 9400.00 42.91 182.81 8803.82 1419.43 S 1990.79 W 3.00 964.32 9500.00 43.03 178.41 8877.01 1487.55 S 1991.51 W 3.00 1030.73 9600.00 43.32 174.05 8949.95 1555.80 S 1987.01 W 3.00 1098.38 9700.00 43.78 169.75 9022.44 1623,97 S 19~7.30 W 3.00 1167.06 9747.17 44.05 167.74 9056.43 1656.06 S 1970.91 W 3.00 1199.77 Eh4 Final Turn 10000.00 44.05 167.74 9238.15 1827.83 ~ 1933.59 W 0.00 1375.55 10500.00 44.05 167.74 9597.53 2167.54 S 1859.79 W 0.00 1723.18 10525.68 44.05 167.74 9615.98 2184.99 S 1856.00 W 0.00 1741.04 TD - E~$t Pt 10525.70 44.05 167.74 9616.00 2185.00 S 1856.00 W 0.00 1741.05 A34-111S EzLtPt Rvsd Feb-2000 All data is in £eet unless otherwise stated. Coordinates from slot #1-4 and TVD from RKB(Est f/Csg Ergrm) (116.00 Ft above mean sea level). Bottom hole d&stanoe is 2866.87 on azimuth 220.35 degrees from ~ellhea~. Total Dogleg £or wellpath is 74.65 dog=ees. Vertt~l seetton 1s from H 0.00 g 0.00 on az/muth 167.74 deg=ees. calculation uses the min~num curvature me~ho~. Presented b~ Baker Hughes ~""' ..... ~ ~ ......... ~i~' '...,..: 08 CROSS T3/4B~-RS OP~-I~JkTZNG CO. A E:T~k~OR~, A34-11152 MidctZe GEouncl Sho~, Cook ZnZet, J~.&sk& I~D ~ Rootangula~ Coo~ds. PROEOSAL L:I:ST:Z]fG Pa~ 2 You~ ~e£ : A34-11~S2 Version #1 L~s~ ~evised : 22-May-2000 Co~ents ~n weZZp&th Comment 5650.00 5300.51 6?5.82 S 5909.64 5545.10 720.15 S 8391.52 7976.56 921.70 S 9004.74 8515.98 1154.99 S 9004.?6 8516.00 1155.00 S 9747.17 9056.43 1656.06 S 10525.68 9615.98 2184.99 S 10525.70 9616.00 2185.00 S 1276.00 W KOE - SL~2~&ok E~ 1348.19 W End D~op/Tuzn 1803.24 W Begin BI~T~n 1936.99 W T~ - En~ Point 193~.00 W ~4-1~S En~ Pt Rvsd F~-2000 1970.91 W E~ Ft~Z T~n 1856.00 W TD - g~t ~t 1856.00 W ~4-11~ Exlt~t Rvsd F~-2000 C&sing positions in 8~tng 'A' m · &eotanguZa~ Coo~d~. Bo~ ND Bo~ fWD Reutanqula~ Coo~d~. Cuing n/a 5300.51 n/a 5300.51 n/a 5300.51 n/a 5300.51 n/a 5300.51 n/& 5300.51 ?a~get namo 675 675 675 675 675 82S 1276.00W 9020.00 8526.96 1164.97S 82S 1276.00W n/a 5300.51 675.82S 82S 1276,00W n/& 5300.51 6~5.82S 82S 1276,00W 5650.00 5300.51 675.82S 825 1276.00W 10525.70 9616.00 2185.005 02S 1276.00W n/a 5300.51 675.82S 1940.56W ?" C~Lng 1276.00W 13 3/8" Cuing 1276.00W 24" Conduotoz 1276.00W 9 5/8" 1856.00W 5" 1276.00W Slo~te~ Targets ama~tate~wtt~ t~La well~at~ ___ Geographic Location T.V.D. R~etan~ula~ Coozdtn~t~s A34-1:LLS Entz~ Pt Rv 8516.00 1155.005 1937.00W 9616.00 2185.005 1856,00W ?-Feb-2000 "/-feb-20 O0 CROSS ~3:MBBRS O~ERAT32qG CO. A L~.,ATFOI~( A34-111'-52 slot #1-4 L~L dd.l.e G=ound Cook TaLer, S U HM A R ¥ C v. E ARA N C I~_ R E ~* O R. T Bakez Hughoa 1:IITEQ You~ col : A34-X:LT,52 VezsLon #1 Our ce£ : ~co1~3873 L4aonse : Date printed : 22-May-2000 D&te are&ted : ?-Feb-2000 L~st =evisad : 22-M~y-2000 FieLd is aent~ed on n60 50 4.803,wXSL 29 11.041 St~uatu~e la aent~ed on n60 46 36.826,w~51 29 36.377 SLot Loa&tion ia n60 47 44.823,wlS1 29 45.042 SLot Grid aoord~n~tea a~o N 2485842.846, E 232790.269 Slot Loaa~ aoord4nataa &~e 6905.00 N 430.00 W Pzo~eation type: a~uk~ - Zono 4, Spheroid: Clarke - 1866 Ob~e=t MSS <10630-13238 '>, ,All-01 ,AFT. Jt, TFOR~ PG~LI <0-10500 ' >. ,.~ll-0Z G~S <0-300'>, ,A11-12,A EZ,ATFOR~ ~SS <320-63'75 ' >, ,Al1-12 P(~LI <0-300 '>, ,All-13,Jt. ~.IS <320-10022'>, oA11-13,A EL,1tcTFOI~M MSS <1787-10200 '>, ,AJ.1-13R2 ,A ELA:TFOI~f ~,.RS <313 -9GS0 ' >, ,A12 -12 ,A E'L,lt.TFOI~( ~(~4.1 <0-300 '>, ,~1.2-12 ,A P~IVI'fO~ [~(~Lt <0-13335°>, ,A12A-01,A H33 <8070-10850 '>, ,~1.3-01,A t~O~ ~ C0-8000 '~, ,~3-01,A ~0~ t~ C8100-8800'>, ,~301~1,A ~S <8824-13397 '>, ,~3-01,A ~O~ ~S <~1540-1264~'>, ,~3-01,A ~S <0-9610 '>, ,~3-12 ,A t~O~ ~S <6506-9900'>, ,~3-12~,A t~T~O~ · ~ <0-682'>, ,~2-01,A t~O~ ~S <0-ZZ202'>, ,~3-0Z,A t~O~ ~S <8177-~1550'>, ,~3-01~,A ~O~ ~S <0-~0960 '>, ,~3-~2 ,A t~O~ ~1-14A Ve=olon ~1, ,~1-14,A ~O~ ~ <9714-11708 '>, ,~l-14LW,A ~M <0-300 '>, ,~-I,A ~S <320-3620'>, ,~-~,A ~O~ ~ <417-9655'>, ,~1-14,A ~S <96~5-12000 '>, ,~2-0~ ,A M <0-9400'>, ,~2-11,A ~O~ ~S <9495-11035'>, ,~2-01,A ~0~ tM <0-0600'>, ,~2-01,A ~O~ ~M C9700-11800 ' >, ,~201~0 ,A ~0~ ~ <~Z843-~2285'>, ,~20Z~0,A ~FO~ ~S <~2013-13894 ' >, ,~201~ ~ <132~0-13821'>, ,~201~2,A ~T~ ~S <1452-~0241 '>, ,~2-14 ,A ~O~ ~ <0-~200 '>, ,~2-14 ,A t~O~ ~ <0-~1530'>,,~2-Z4,A ~O~ ~S <Z0230-Z2880 '>, ,~2-14LS,A ~O~ ~S <383-12586'>, ,~3-01,A ~M <0-320 '>, ,~3-01 ,A ~O~ ~S <~259-~750'>, ,~4A-1,A ~ <0-7200 '>, ,~4A-1 ,A t~O~ ~ <0-9930'>, ,~3-~1,A ~O~ ~S <8780-11501'>, ,~3-1~S,A ~FO~ ~M <0-300 '>, ,~3-14 ,A 9~O~ ~ C0-1000 '>, ,~4-14 ,A ~0~ ~S <1046-11480 ~>, ,~4-14 ,A ~FO~ ~ <5643-12100 ' >, ,A34-14~,A ~O~ ~ <0-7200 '>, ,A41-11,A ~O~ ~ <7208-10863 '>, ,~I-lZ,A ~O~ ~ <8762-11156'>,,~1-1~,A ~0~ ~ <0-7?65'>, ,Ai~-11,A ~ <0-4000'>, ,~2-~1,A ~O~ ~S <4115-8800~>, ,A42-11,A ~FO~ ~ <8854-10175 ~>, ,~2-11~,~ ~2-14A Version ~1, ,~2-14 ,A ~O~ t~ <0-~034 '>, ,~2-14 ,A ~0~ ~S <~250-10800 '>, ,~2-14 ,A t~O~ ~ <8748-9840 ~>, ,~3-11,A ~ <0-8700'>, ,A43-11,A ~O~ t~ <0-11997'>, ,A44-02,A ~S <390-9260'>, ,A44-11,A ~MS <0-320 '>, ,A44-11,A ~O~ ~4-0~ Ve=s~on j3, ,~4-0$A,A ~FO~ ~4-0~ ~e=s~on ~1, ,~4-01,A ~O~ ~4-01~ Verl~o~ ~5, ,~4-01~;A t~O~ WSS <9100 - 10618'>, ,~4-01~,A ~T~O~ ~ C0-300'>, ,~4-01,A 9~0~ H~S <316-10038'>, ,~4-01,A ~4-01A Ve=,ton ~1~ ,~4-0~,A ~FO~ ~4-01B Ve=s~on ~1, ,~4-01,A t~O~ Closest. &~o.co&c~ v.it:h 3-D W. zd.m~m D.t. sta.~Ge 8-feb-2000 16-Feda-2000 8 -Feb-2000 8-Feb-2000 1G-Feb-2000 11-Feb-2000 8-Feb-2000 B-Feb-2000 1G-Feb-2000 16-Feb-2000 1G-Feb-2000 8-feb-2000 16-Feb-2000 16-Feb-2000 16 -Feb-2000 16-feb-2000 8-feb-2000 8-feb-2000 16-Feb-2000 16-Feb-2000 8-feb-2000 8-feb-2000 8-Feb-2000 8-feb-2000 16-feb-2000 1S-feb-2000 16-feb-2000 8-feb-2000 8-feb-2000 8-feb-2000 8-feb-2000 16-feb -2000 16-feb -2000 8-Feb-2000 8-Feb-2000 8-feb-2000 8-Feb-2000 16-feb-2000 1G-feb-2000 16-feb-2000 8-feb-2000 16-Feb-2000 8-feb-2000 16-1'eb-2000 16-feb-2000 16-feb-2000 8-feb-2000 1g-feb-2000 16-u'eb-2 O O 0 16-feb -2000 1E-feb-2000 16-feb-2000 16-feb-2000 16 -Feb-2000 16-Feb-2000 16-Feb-2000 16-Feb-2000 16-Feb-2000 16-Feb-2000 8-Feb-2000 16-feb-2000 11-Feb-2000 8-feb-2000 16-feb-2000 16-feb-2000 8-feb-2000 1S-feb-2000 11-feb-2000 23-MaLe-2000 7-feb-20oo 3-Ap~-2000 1-Ap3:-2000 1 G-Feb-2000 23-~mr-2000 8-Feb-20OO 3850 0 3950 0 5226 4 2757 2 5224 7 1891 1 2256.9 2355.3 5210.7 3336.4 3336.4 3621.8 3621.8 3621.8 3621.8 3621.8 1380.6 1380.6 4880.8 4146.8 3638.7 3638.7 1524.3 1513.0 653.5 5205.6 2237.6 1072.7 2907.8 1425.5 1425.S 2907.8 2907.8 2907.8 2907.8 2907.8 882.9 4337.6 1727.2 1727.2 3838.1 5208.7 3779.7 3779.7 629.7 629.7 2442.8 520?.6 4538.3 2108.4 2108,4 2493.0 2493.0 2493.0 2556.1 2556.1 2061.8 1786.0 1786.0 2717.3 4543.9 1740.2 1411.2 1411.2 1411.2 2808.8 1371.2 5206.4 5329.0 5904.9 6320.9 5329.0 3320.6 5210.3 3320.6 2192.6 6388.6 5650 0 5650 0 5650 0 5650 0 5650 0 5650 0 10525.7 5650.0 5650.0 5650. o 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 10120.0 10525.7 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650,0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650. O 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 10525.7 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 6700.0 ?380. o 7500.0 6700.0 5650.0 5650.0 5650.0 5650.0 8040.0 DIvezgLng £zc~ M.D. 5650.0 5650.0 5650.0 5650.0 5650.0 10525.7 10525.7 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650 0 5650 0 5650 0 5650 0 10160 O 1O525 7 5650 0 5650 0 1032O 0 5650 0 5650 0 5650 0 5650 0 5650, Q 5650.0 5650.0 5650.0 10525.7 5650.0 10525.7 10525.7 5650.0 5650. o 5650.0 5650.0 5550.0 10140.0 10525.7 5650.0 5650.0 10525.7 10525.7 5650.0 5650.0 5650.0 5650.0 5650. o 5650.0 5650.0 5650.0 10525.7 5650 0 10525 7 5650 o SG50 0 7700 0 5650 0 9522 2 5650 0 6700 0 7380 o 7500 0 670O 0 5650 0 5650 0 5650 0 5650 0 8040 0 :.',!',':,:: ?;':.;!:..?'.:?.. A24-03.T-f- Vets'ion #2, ,A24-03.,A ;'LATF01:~( DO ~qOT USE, ,A24-03.,A 2MSS <9960-3.L994'~, ,A2.4-0~T.E,A MSS <0-3.0900 *>, ,A24-01 ,A ;'~T~'0~!4 ;'HSS <8303-11209'>, ,A34-13Z.,-q,A L:rT.,ATI'01~f ;'GMS <0-10330 '>, ,A34-13.,A 23-Ma.c-2000 3.6-1Peb-2000 · 3.6-1'eb-2000 16 -ret) -2000 22-H,zy-2000 22-MAy-2000 503/7.0 53.3.6.3 3488.9 3488.9 0.0 0.0 5650.0 5650.0 5650.0 5650.0 5650.0 5650.0 5960.0 5850.0 5650.0 5650.0 10320.0 9920.0 CROSS TIMBERS OPERATING CO. Structure: A PLATFORM Well : A54-11LS2 Field : Middle Ground Shoals Location : Cook Inlet, Alaska 420O 4500 4500 5100 5400 5700 6000 6300 660O iD 6900 '~ 7200 >- 75oo L. I'--7800 I V 81oo 8400 8700 9000 9300 9600 ggo0 10200 1200 KOP - Sidetrack Pt 23.82 DIS: 6.00 deg per 100 ft 17.92 End Drop/Turn 12.12 Cr~t~ by jone~ For: B Pen~ose Date plotted: 22-May-2000 Plot Eo~nco i~ ~34-11~ V~ ~I. 167.74 AZIMUTH 1741' (TO TARGET) ***Pla~e of Proposal*** 9 5/8 Casing TANGENT ANGLE 11.57 DEG Begin Bid/Turn11,85 16.07 DL$: 6.00 deg per 100 ft 21.15 26.60 32.24` Tgt- Entry Point 37.97 A34`-1 ILS Entry Pt Rvsd Feb-2000 4,5.77 7 Casing 42.95 DIS: 5.00 deg per 100 ft 42.91 43.03 43,32 End Final Turn 43,76 TARGET ANGLE 44.05 DEG TD - Exit Pt A34-11LS ExitPt Rvsd Feb-2000 i 900 i i i i i i i i i i I i [ , i i i i i i 800 300 0 300 600 gO0 1200 1500 1800 2100 Vertical Section (feet) -> Azimuth 167,74 wlfh reference 0.00 N, 0.00 E from slol #1-4 i I I 2400 2700 fCROSS TIMBERS OPERATING CO. $tru~ctur----~ : A PLATF---'-----~R--~- Field : Mldd)e Ground Shoo~s Locat)on : Cook 500 <- West (feet) 2400 2300 2200 21 O0 2000 1 go0 1800 1700 1500 1500 1400 1,500 1200 11 O0 1000 gO0 500 600 6O0 700 BO0 goo 1 ooo - 1100- - Torget - 8516.00 Tvd, 1155.00 1200 - . 1300 - 1400 - 1500 - 1 soo 1700 1800 1900 2000 2100 · 2200· · 2300. 2400 Tie on - 5500.51 S, 1276.00 75O~- 7900~ ' 8100~' · 8~00~ · , 8500. S, 1937.00 w? 700 00 .8900 59oo~- · ~700 6500 ~700 ~00 7100 ?3O0 7700 ,7900 8100 85OO ~t 9100 ,~ 9100 , ~, 9300 ', ~ ,700 9500 T.D. & Target - g616.00 Tvd, 2185~~ .8500 700 80O 900 1 ooo . - 11oo 1200 1300 0 3300. 1~oo 1500 --I- lSOO I 1700 1800 1900 2000 2100 2200 2300 2400 I I I i i ~ I i i i i I i i i i i I 2400 2500 2200 21 O0 2000 1900 1800 1700 1600 1500 1400 1300 1200 11 O0 1000 900 <- West (feet) R A~ska Oi~ & Gz~s Cons. Commission A~.,.,hom.ge ( CROSS TIMBERS OPERATING CO. Structure: A PLATFORM Well : A34-11LS2 Field : Middle Ground Shoals Location : Cook Inlet, Alaska 310 3OO 320 330 340 TRUE NORTH 350 0 280 10 2O 3O 40 50 6O 290 7O 280 8O 270 2~ ~0 90 260 100 25O 110 240 120 23O 22O 210 200 190 180 130 6gO0 170 7100 160 150 140 Normal Plane Travelling Cylinder - Feet All depths shown are Measured depths on Reference Well CROSS TIMBERS OPERATING CO. Structure: A PLATFORM Well : A34-1 1LS2 Field : Middle Ground Shoals Location: Cook Inlet, Alaska 600 700 800 900 1000 1100- - 1200 - 1300 - 14oo 1500 1600 1700 1800 1900 2000 · 2100. - 2200- . 2300 - - 2400- <- West (feet) 2300 2200 21 aa 2000 19oo 18oo 1700 1 $oo 1500 1400 1300 1200 11 O0 1000 900 i i i i i i I i i i I I i I I I I I I I I I I I I I I I TGT - ENTRY PT LOCATION: 470' FSL, 2365' FEL SEC. 11, TSN, R15W, SM 7 Casing Point Pt Rvsd 67.74 AZIMUTH 1741' (TO TD) ***Plane of Proposal*** End Final Turn TD - Exit Pt A34-11LS Exi[Pt Rvsd Feb-2000 TO - EXIT POINT LOCATION: 561' FNL, 228~,' FEL SEC. 14, T8N, R13W, SM i i i i i i i ] i i i i i i ~ i [ i i I i i i i i i i i 2300 2200 21 O0 2000 1900 1 BOO 1700 1600 1500 1400 1300 1200 1100 1000 600 700 800 9OO 1 DO0 . - 11oo 1200 1300 0 1400 .-i- 1500 "~ .-I- 1600 I 1700 1800 lgoo 2O00 2100 22OO 2300 2400 900 <- West (feet) -~ 0 --4 00 b o b ~ ¼ ¼ b -, -~ -~ CD ~ b Lo Lo ~o .--, CD --, co -~ CD b ¼ L~ o c~ o~ 0 0 0 0 0 © 0 WELL PERMIT CHECKLIST COMPANY. /,-,~,~ WE~ROGRAM: exp dev redrll serv FIELD & POOL ~~ INIT CLASS ~4:~/~ GEOL AREA ~ ~ UNIT# ADIJNISTRATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. DATE 12. ENGINEERING Permit fee attached ............... . ............ Lease number appropriate.'~'~ Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit .b,o~[}~_ary .... Well located proper distance from other wells.~ ...... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected pady ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... APPR DATE... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... ~) N 19. Casing designs adequate for C, T, B & permafrost ....... ~ N 20. Adequate tankage or reserve pit ................. ~, N 21. If a re-drill, has a 10-403 for abandonment been approved... N 22. Adequate wellbore separation proposed ............. (~ N 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation .............. : · 26. BOPE press rating appropriate; test to ..,~'O(~:3 ps,g. (~ N 27. Choke manifold complies w/APl RP-53 (May 84) ........ ~ N N wellbore sag ann. disposal para req __ ON/OFF SHORE N o~ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. {~ GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... 31. Data. presented on potential overpressure zones ....... 32. Seismic analysis of shallow gas zones ........... .~ ~ .Y. ,N, APP..=R DAZE 33. Seabed condition survey (if off-shore) .......... ~.. Y N ,'~ ~,~._C)~, 34. Contact name/phone for weekly progress reports fexl~ratory only] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable recei~/Jrtg~e; ....... Y N APPR DATE (B) will not contaminate freshw~er~, or cau?~.'rdrilling waste... Y N · to surface; / (C) will not impair m~ical integrity, xff the well used for disposal_~;_~.Y N (D) will not dfm~roducing forl~at~n ~a Y N pool; a Y N GEOLOGY: ENGINEERI. NG: UlClAnnular COMMISSION.: Commentsllnstructions: ITl ;13 rtl c:~soffice\wordian\diana\checklist (rev. 02117100)