Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout200-147STATE OF ALASKA ALASKA OI AND GAS CONSERVATION COMMIS ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended zoAAC zs.~os zoAAC 2s.»o ^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.: 5/23/2010 12. Permit to Drill Number: 200-147 309-350 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded: 10/20/2000 13. API Number: 50-029-21988-02-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached: 10/28/2000 14. Well Name and Number: PBU 05-256 2558 FNL, 173 FWL, SEC. 32, T11 N, R15E, UM Top of Productive Horizon: 3231' FNL, 2396' FEL, SEC. 31, T11 N, R15E, UM g. KB (ft above MSL): 72.13' GL (ft above MSL): 34' 15. Field /Pool s ()~ Prudhoe Bay Field / Prudhoe Bay Total Depth: 3802' FNL, 4056' FEL, SEC. 31, T11N, R15E, UM 9. Plug Back Depth (MD+TVD): 9551' 8786' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 697246 y_ 5948888 Zone- ASP4 10. Total Depth (MD+TVD): 11582' 9045' 16. Property Designation: ADL 028326 TPI: x- 694698 y- 5948149 Zone- ASP4 Total Depth: x- 693055 Y- 5947536 Zone- ASP4 11 • SSSV Depth (MD+TVD): N/A 17. Land Use Permit: 18. Directional Survey: ®Yes ^ No Submit electronic and rioted information er 20 AAC 25.050 19. Water depth, if offshore: N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD GR & MEM GR / CCL / CNL 22. Re-DrilULateral Top Window MDlfVD: 9970' 9043' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE r-AMOUNT CASING. WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 2 " 101# H-40 urf 110' S rFa 110' 2150 # P I -/" 4 1 -1 1 x 1 7-5/ " 2 .7# L-80 SurFa 2 ' Surf ce 8483' -7/ " 410 sx Clas ' -1 /2" 17# L-8 874' 9272' 1 27' 6-3/4" 1 sx Class 'G' -1 1 7' 1 /4" x l 2- / " 4.6# L-80 9 74' 11581' 9 045' 3" 77 sx LARC 24. Open to production or injection? ^Yes ®No 25. TueiNG RECORD If Yes, list each interval open (MD+TVD of To 8 Bottom Perforation Size and Number): SIZE DEPTH .SET MD PACKER SET MD / TVD p ~ ; 4-1/2", 12.6#, L-80 8820' 3893' / 3891' MD TVD MD TVD 8765' / 8094' 26. ACID, FRACTURE, CEMENT SQUEEZE;: ETC. DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED 9551' Set Whipstock 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: Production For Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: Calculated 24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 28. CORE DATA Conventi onal Core(s) Acqu ired? ^Yes ® No Sidewall Core(s) Acquired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory anr~ptr ~~A~250.071. None ~ ~ ~,'„J ,IUN ~ ~ 2010 Alaska 0~1 & ~~ C~.~:. Commission Form 10-407 Revised 12/~~i.~M.7 dUN ~i5 ~ CONTINUED ON REVERSE ,=all~:I~"?'11t original only ~7zi ~a 29. GEOLOGIC MARKERS (List all formati ons and ma encountered): 30. NATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 9126' 8404' None Shublik 9170' 8441' Sadlerochit 9256' 8513' Zone 1A 10004' 9048' Formation at Total Depth (Name): 31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~/_ / (J~ / ~ Signed: Terrie Hubble Title: Drilling Technologist Date: ( ~I ~O PBU 05-25B 200-147 309-350 Prepared ByNameMumber. Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Ron Phillips, 5645913 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only r~ u 05-25B, Well History (Pre Rig Sidetrack) Date Summary 1/23/2010 T/I/0= 2300/780/140. Temp= S/I. MIT-IA PASSED to 3000 psi. MIT-OA PASSED to 2000 psi. (CTD Prep) Pressured up IA to 3000 psi w/ 2 bbls 40°F Crude. MIT-IA lost 140 psi in 1st 15 mins, and 40 psi in 2nd 15 mins, w/ a total loss of 180 psi over 30 min test. Bled IAP down. Bled back - 1.7bbls. MIT-OA: Pressured up OA to 2000 psi w/ 1.7 bbls 40°F Crude. MIT-OA lost 20 psi in 1st 15 mins, and 0 psi in 2nd 15 mins w/ a total loss of 20 psi over 30 min test. Bled OAP down. Bled back -2 bbls. FWHP's= 2300/600/80. Well turned back over to DSO. 1/25/2010 WELL S/I ON ARRIVAL. DRIFT TBG W/ 20' x 2.74" WHIPSTOCK, SD C~ 8,835' SLM. DRIFT W/2.70" CENT, 2.50" S-BAILER, SD C~ 9,518" SLM. (no sample). RUN LIB TO TOP OF DEP SLV C~3 9,518' SLM / 9,574' MD. DRIFT TWICE W/ 20' x 2.70" WHIPSTOCK, SD C~3 8,812' SLM. DRIFT W/10' x 2.70" WHIPSTOCK, SD C~2 9,261' SLM. WELL S/I ON DEPARTURE, DSO NOTIFIED. NOTE: UNABLE TO REACH TARGET DEPTH FOR EL WHIPSTOCK. 3/2/2010 T/IA/OA= SSV/780/150 Temp=Sl PPPOT-T (PASS) PPPOT-IC (PASS) (Pre CTD) PPPOT-T : RU 2 HP BT onto THA 500 psi bled to 0 psi, flush void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD test equipment, re-installed Alemite caps. Cycle and torque LDS "ET style" all functioned with no problems. PPPOT-IC : RU 2 HP BT onto IC test void 100 psi bled to 0 psi, flush void until clean returns achieved. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3500/ 30 minutes. Bleed void to 0 psi, RD test equipment, re-installed Alemite caps. Cycle and torque LDS "ET style" (1) pin twisted C«? 9:00 left in out position all others functioned with no problems. 4/14/2010 T/I/O=SSV/800/200, Temp=Sl~Re~air leakingwell head. Found 2 LDS assemblies on TBG head showing signs of past leak (not leaking at this time). Stung into test void (0 psi). PT test void to 5000 psi for 15 min, not leaking. Bled void to 0 psi, cleaned up well head. 5/3/2010 MIRU CTU & MU BTT Dummy WS BHA. RIH to 5.5 x 3.5" XO at 8790'. Drift XO twice. RIH to TD at 9532' ctd. POH to XO and drift once w/o pumping. Small weight bauble 1st time thru XO, no problems after that. POH, FP w/ 35bbls 50/50 methanol to 2300'. RD. Job Complete. 5/15/2010 T/I/0=1000/620/0. Set 4" CIW 'H' TWC using 1-2' ext., tagged C~3 100". Torqued 1-1/4" L7M studs to API specs using RSL2 torque head (726 ft/Ibs.). Gained no movement on any nuts. Marked studs & nuts w/yellow marker after verifying torque. Pressure tested tree to 4500~si., (passed). Pulled 4" CIW 'H' TWC. All tree valves left in normal position. Job complete. 5/19/2010 T/I/O =SSV/320/7. Temp = SI. Bleed IAP & OAP to 0 psi (Pre rig). No AL, flowline or wellhouse. IA FL C«~ 456' (12 bbls). OA FL near surface. Bled IAP from 320 psi to 0 psi (to BT, gas/slugging fluid) in 6.5 hours. Bled OAP from 7 psi to 0 psi in <1 min (gas). Monitor for 30 min. IAP & OAP increased to 0+. FWHP's SSV/0+/0+. 5/19/2010 T/I/0=750/640/40 temp=S/I Load to Kill (CTD Prep) Pumped 5 bbl neat meth spear fallowed by 220 bbls 1% KCL. TBG pressured up and fluctuated between 2400 psi and 2900 psi while pumping C«? 2.6 bpm. Pumped 40 bbls DSL down TBG for Freeze Protect. DSO & PE notified upon departure. FW P=0/250/0 5/22/2010 T/I/O = BPV/0/0 Re-torqued tree flanges after Nordic 1 installed BOP equipment onto tree. Using RSL2 torque head set at 5250 psi to obtain 726 ft-Ibs (L7M stud spec). Page 1 of 1 • • North America -ALASKA - 6P Page 1 of 2 Operation Summary Report Common Well Name: 05-25 AFE No Event Type: MOBILIZATION (MOB) j Start Date: 5/21/2010 End Date: 5/22/2010 X3-OOTWB-C (596,934.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: _ Active Datum: 50:25 7/29/t996 00:00 @72.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ~ Phase Description of Operations (hr) (ft) 5/21/2010 21:30 - 21:45 0.25 MOB P PRE RD AND PREP TO MOVE RIG OFF OF WELL. 21:45 - 22:00 0.25 MOB P PRE PJSM WITH PAD OPPERATOR FOR MOVING RIG i OFF OF WELL 22:00 - 23:00 1.00 MOB i P PRE MOVE RIG OFF OF WELL AND CLEAN UP WELL HEAD. 23:00 - 23:10 0.17 MOB P ' PRE I }PJSM WITH SECURITY FOR RIG MOVE - --- 23:10 - 00:00 0.83 MOB P ~ PRE MOBILIZE RIG OFF OF DS 01 FORDS OS 5/22/2010 00:00 - 01:30 1.50 MOB PRE " CONTINUE RIG MOVE FROM DS 01 TO DS 05 01:30 - 02:00 0.50 MOB PRE POSITION RIG TO PULL OVER WELL - ----- -- 02:00 - 02:15 0.25 -- MOB PRE PJSM WITH PAD OPERATOR FOR PULLING OVER WELL 05-25B ___ _ -- ~ ----- 02:15 - 03:00 _ 0.75 MOB PRE j POSITION RIG OVER WELL AND LEVAL UP. j i ~ 0 - -- _ 03 00 04:00 1.00~~ ~ MOB PRE RU EQUIPMENT,GREASE TREE AND NU CROSS I j _ OVER FOR BOP TO_T_R_EE HEAD. _ 04:00 - 06:00 _ 2.00 ttt _ --- MOB _ PRE NU BOP'S 06:00 - 08:00 2.00 MOB PRE RU 10FT LUBRICATOR. RU HOT TUB. INSTALL .CHINA HAT. GET STACK MEASUREMENTS. POST ~ BOP SCHEMATIC. SPOT SUPPORT EQUIPMENT. 08:00 - 09:30 1.50 MOB PRE RU GREASE CREW & TORQUE TREE BOTLS, ~ RESERVE PIT SIDE OF TREE REQUIRED MINIMAL TIGHTENING. SIMULTANEOUSLY, TEST FLOOR ~ VALVE PER BI-WEEKLY BOPE TEST, 250PSI & 3500PSI. FILL PITS & MAKE MINOR ADJUSTMENT TO SLB j PIT SENSORS. __ ___ _ _ 09:30 - 15:50 _ 6.33 i BOPSUR ~ ______ PRE FILL BOP STACK WITH WATER. FUNCTION TEST ~ BOPE PER AOGCC REGS. SHELL TEST BOPE TO 250PSI/3500PSI -PASS. TEST BOPE PER AOGCC REGS, 250PS1 & 3500PSI-PASS. JOHN CRISP FROM AOGCC WAIVED WITNESS. PJSM FOR RU DSM LUBRICATOR & PULLING BPV. _ ____ _ 15:50 - 17:30 1.67 BOPSUR I __ PRE OPEN TREE DOWN TO THE MASTER - 0 PSI. I RU DSM LUBRICATOR. ~ I PRESSURE TEST 250PSI & 1000PSI. ~ j PULL BPV. ~ -- 1----- --,- 1.._ --~ - SET TWC. STAB ON WELL WITH PULLING TOOL. 17:30 - 18:10 0.67 BOPSUR ~ PRE PRESSURE TEST TREE TO 3500PSI -PASS. ~ 18:10 - 19:05 0.92 RIGU PRE CREW CHANGE, SPILL CHAMP /WALK I AROUNDS, AND PJSM FOR PUMPING SLACK - - AND CUTTING COIL 19:05 - 20:30 1.42 RIGU PRE CIRC OUT DIESLE FP IN COIL TO CB. ~ TEST AND REBOOT ELINE ~ STAB ON WELL AND REVERSE FOR SLACK MANAGMENT OF ELINE ~~+ Printed 6/1/2010 11:34:22AM r~ North America -ALASKA - BP Page 2 of 2 Operation Summary Report Common Well Name: 05-25 AFE No Event Type: MOBILIZATION (MOB) Start Date: 5/21/2010 End Date: 5/22/2010 X3-OOTWB-C (596,934.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name/No.: NORDIC 1 Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 50:25 7/29/1996 00:00 @72.1 ft (above Mean Sea Level) Date i From - To Hrs Task Code NPT ~ NPT Depth Phase Description of Operations I (hr) (ft) 20:30 - 21:00 0.50 BOPSUR PRE PT INNER REEL VALVE AND PACK OFFS TO 2500 PSI LOW AND 3500 PSI HIGH 21:00 - 00:00 3.00 RIGU PRE I UNSTAB INJECTOR AND RU CTC CUT OFF 350 FT OF CT MU SLB KENDALL AND PULL TEST TO 25 K AND PT TO 3700 PSI ~ MU BHI UOC AND TEST - - PT UOC TO 3500 PSI (23:05) Printed 6/1/2010 11:34:22AM • North America -ALASKA - BP Page 1 Operation Summary Report __ Common Well Name: 05-25 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/21/2010 End Date: X3-OOTWB-C (895,684.00 ) Project: Prudhoe Bay Site: PB DS 05 Rig Name/No.: NORDIC 1 ; Spud Date/Time: Rig Release: Rig Contractor: NORDIC CALISTA UWI: Active Datum: 50:25 7/29/1996 00:00 @72.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/23/2010 00:00 - 01:20 1.33 KILLW P WEXIT BULL HEAD INTO WELL WITH CLEAN 2% KSiL_ STARTED WITH 4 BPM UNTILL PRESSURED UP TO 1000 PSI SLOWED PUMPS DOWN ACCORDINGLY TO .STAY BELOW 2200 PSI STABLE AT 2.2 BPM 2250 PSI ____ _____ _ ___ _ PUMPED AWAY 250 BBLS 01:20 - 01:45 0.42 KILLW P WEXIT __ .FLOW CHECK WELL AND PJSM FOR MU OF WHIPSTOCK SETTING BHA WELL IS ON A SMALL VAC 01:45 - 02:25 0.67 STWHIP P WEXIT _ _ STAB ON WELL AND PUMP SLACK FORWARD 02:25 - 03:15 0.83 STWHIP P WEXIT MU WHIPSTOCK SETTING BHA- STAB ON AND TEST TOOLS RIH TO 100 FT AND BHI DEPTH ENCODER IS ____ _ TRACKINGNEG DEPTH . 03:15 - 03:40 0.42 STWHIP N HMAN 100.0 WEXIT ___ STOP AT 100 FT AND INSTALL THE BHI DEPTH _ _ _ 03:40 - 05:40 2.00 STWHIP P. ' WEXIT..... ENCODER ON THE PROPER OUT PUT SHAFT. RIH AT-0.5 BPM WITH EDC OPEN _ ~ _ _ 75 FT/M_IN _ 05:40 - 06:15 0.58 STWHIP P ~ WEXIT LOG FOR GR TIE IN FROM 9420 FT TO 9460 FT ~ MADE +20 FT CORRECTION ___ SHUT OFF PUMPS AND CLOSE THE EDC 06:15 - 06:30 0.25 STWHIP P _ WEXIT UP WT =33 K - RIH WT=19,5 K RIH TO BIT DEPTH OF 9560.73 FT PU TO UP WT OF 31 K AND STOP PUMPS ON AND PRESSURE SHEARED OFF AT ___. ~ 06:30 - 08:20 __ 1.83 ~ STWHIP P WEXIT 3000 PSI AND WOB CAME UP TO 2400 #'S DH B TOW IS AT 9550 FT AND 25 ROHS TF POOH SWAPING WELL BORE TO GEO VIS. 08:20 - 08:30 0.17 STWHIP P WEXIT FLOW CHECK WHILE CONDUCTING PJSM REGARDING LD WS SETTING TOOL & MU _____ WINDOW MILLING BHA. 08:30 - 08:50 0.33 STWHIP P WEXIT POP OFF WELL. LD SETTING TOOL. 08:50 - 09:20 0.50 STMILL P WEXIT MU 2.80" WINDOW MILLING BHA. 09:20 - 11:10 1.83 STMILL P WEXIT RIH WITH WINDOW MILLING BHA (BHA #2). ____ CIRCULATE, 0.356PM AT 1045PSI. 11:10 - 11:44 0.57 STMILL ~ P WEXIT ___ LOG DOWN FOR TIE-IN FROM 9470E WHILE CIR _ j _,. _ ~ 0.32BPM AT 1415PSI, PLUS 20FT CORRECTION. 11:44 - 11:50 0.10 i STMILL P ~ WEXIT RIW = 19K. PUW = 33K W/OUT PUMPS. DRY TAG AT 9153FT. PUW=30K W/ PUMPS. __ ___ _ ~ TAG WITH PUMPS AT 9551 FT C L L T c ~ 11:50 - 13:50 2.00 STMILL P WEXIT TIME MILL WINDOW FROM 9551 FT PUMPING aC ~ O CJ ~7 i 1.52BPM AT 2650PSI FS & 100-150PSI MW. PUMPING USED 8.56PPG GEO-VIS. WITH 0.5K STARTING WOB & 9.6PPG ECD. PVT = 293 MILL TO 9552.3FT 13:50 - 14:00 0.17 STMILL P WEXIT PUH & ZERO WOB. Z Printed 6/1/2010 11:51:59AM TREE _ WELLF~AD = ACTUATOR = B Kti~. ELEV - 72.1' BF. ELEV KOP = 4000' Max Angle = 94° @ 11022' Datum MD = 9645' Datum TVD = 8800' SS 10-3/4" CSG, 45.5#, J-55 BTC, ID = 9.953" ~~ 3490' Minimum ID =1.780" @ 9455' BTT DEPLOYMENT SLEEVE SAFETY NO WELL ANGLE > 70° @ 9856' ***OTELL, 05-25A & OS-25B NOT SHOWN BELOW WHIPSTOCK*** ~ 2189' ~4-1/2" CAMCO BAL-O SSSVN, ID = 3.812" CHAS I IFT MANI~RFI S ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2 3583 3826 3582 3824 2 5 KBMG-M KBMG-M DMY SO BK BK 0 20 11/18/00 06/11/10 3893' ~~ 7-5/8" X 4-1 /2" BKR S-3 PKR ID = 3.958" 876~~ 7-5/8" X 4-1/2" BKR S-3 PKR, ID = 3.958" 8798' 4-1/2" HES XN NIP, ID = 3.725" 8818' ~ 7-5/8" X 5-1 /2" BKR ZXP LTP w /TIEBACK SLV I & HMC LNR HGR, ID = 4.892" 4-1/2" TBG, 12.6#, L-80 BTGM, $$2Q' 8820' 4-1/2" WLEG, ID = 3.958', .0152 bpf, ID = 3.958" 8840' 5-1/2" X 3-1/2" XO, ID = 2.992" 8874' 7-5/8" X 5-1/2" BKR HY-FLO II LNR HGR, ID = 4.892" 7-5/8" CSG, 29.7#, L-80 BTGM, ID = 6.875" ~ 9220' 5-1/2" LNR, 17#, L-80 FL4S, 9272' .0232 bpf, ID = 4.892" i 9447' I 3-1/2" WHIPSTOCK (05/23/10) RA TA G 3-1/2" LNR, 9.3#, L-80 NSCT/STL, .0087 bpf, ID = 2.992" PERFORATION SUMMARY REF LOG: SWS CCL/GR/MCNL ON 06/02/10 ANGLE AT TOP PERF: 91 ° @ 10979' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1.56" 6 10979 - 11359 O 06/06/10 1.56" 6 11535 - 11870 O 06/06/10 ~I 5-1/2" MILLOUT WINDOW (05-25A) 9272' I 9442' 3-1/2" KB LTP, ID = 1.810" 9447' 2.70" BTT DEPLOYMENT SLV, ID = 1.780" 3-1/2" MILLOUT WINDOW (05-25C) 9551' - 9557' I PBTD I 2-3/8" LNR, 4.7#, L-80 STL, .0039 bpf, ID = 1.995" I-{ 11929' DATE REV BY COMMENTS DATE REV BY COMMENTS 01/12/90 N28E ORIGINAL COMPLETION 06/21/10 ?/JMD DRLG DRAFT CORRECTIONS 08/27/96 D9 RWO -SIDETRACK 10/31/00 ? CTD -SIDETRACK (05-25B) 06/03/10 NORDIC 1 CTD -SIDETRACK (05-25C) 06/06/10 SV DRLG HO CORRECTIONS 06/14/10 CJWSV GLV C/O (06/11/10) PRUDHOE BAY UNIT WELL: 05-25C PERMTf No: 2091240 API No: 50-029-21988-03-00 SEC 32, T11 N, R15E, 2558' FNL & 173' FWL BP Exploration (Alaska) 4" CM/ AKERC J Q F~ O ~2 5 5C • • F ~~F ~` `;~ ~- 1 y ~-- Y ~--' ~ 4 Y ~ ~ ~ ~[ ~ ~ F % ~~-~' ~ j ~ ~~ ,"~~ ~~ ~ f~ f ~ ~ ~ ~ ~ ~ u ~ G ~ . h ~ i ~ f P ? ~4 ~ ~ ~ e ~ ,~ ~~~ ~ ~ ~ r ~ ~ k; + ~ ~ ~ ,t ~ ~ ~ ~ ~ ' ~ i ~ ` , ~~ ~ ~~g ~ ~~~ ~ ~ ~' ~ SEAN PARNELL, GOVERNOR ~.~~ ~._~ ~~,~ ~ ~~`~_ F~'' ¢ r.~€ ~,.; t ~ ~ ~ ~ r.~e.-~ ~3 ~ ~ ~~ i~~~ ~ ~-7~ ~I~ oasa~ a~n--.7 ~ 333 W. 7th AVENUE, SUITE 100 COI~TSERQATIOAT COrII~IISSIOI~T ~ ANCHORAGE, ALASKA 99501-3539 ~ PHONE (907) 279-1433 ~ FAX (907) 276-7542 Mr. John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 99519-6612 ~ ~ ~ ~ Anchorage, AK 99510 ~,~~ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 05-25B Sundry Number: 309-350 ~;~~~~~ NO`d ~ ~ 2009 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, ~ Cath P. Foerster Commissioner DATED this ~ of October, 2009 ~ Encl. ~, brp~ 0 ~' 1 STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~N APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 ?~E~EIVE~~ ~CT ~. 2 ~00~ rr ~lll f . Type of Request: ' A,,,~ ~ Abandon ~ ^ Suspend ^ Operational Shutdown ^ Perforate ^ Re-Enter Suspended'R~Ih0~8~$ ^ Aiter Casing ^ Repair Well ^ Plug PerForations ^ Stimulate ^ Other Specify: ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Time Extension 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ,~ Development ^ Exploratory Z00-147- 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21988-02-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: pBU 05-25B ~ Spacing Exception Required? ^ Yes ~ No 9. Property Designation: 10. Field / Pool(s): ADL 028326~ Prudhoe Bay Field / Prudhoe Bay Oil Pool ~ ~- PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth ND (ft): Piugs (measured): Junk (measured): 11582' - 9045' ~ 11544' 9044' 10060' None Casin Len h Size MD ND Burst Colla e Structural Conductor 110' " 110' 110' 1 50 6 0 Surface 490' 1-3/4" 3490' 3490' 3580 2 90 Intermediate 9220' 7- /" 9220' 8483' 6890 4790 Production Liner 398' S-1/2" 8874' - 9272' 8188' - 8527' 7740 6280 Liner 1152' 3-1/2" 8818' - 9970' 8140' - 9043' 10160 10530 Liner 2 7' 2- /" 74' - 11 1' 880 '- 45' 12 11780 Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9926' - 11203' 9033' - 9048' 4-1/2", 12.6# L-80 8820' Packers and SSSV Type: 7-5/8" x 4-1/2" Baker'S-3' packer; Packers and SSSV 3893' / 3891' 7-5/8" x 4-1/2" Baker'S-3' packer MD (ft) and TvD (ft): 8765' / 8094' 12. Attachments: 13. Well Class after proposed work: ~ Description Summary of Proposal ^ BOP Sketch ^ Detailed Operations Program ^ Exploratory ~ Development ^ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: October 23, 2009 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ~ Abandoned 16. Verba! Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG Commission Representative: 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ron Phillips, 564-5913 Printed Name John Mc Ilen Title Engineering Team Leader Prepared By Name/Number Signature Phone 564-4711 Date ~G Q G~ q Terrie Hubble, 564-4628 Commission Use Onl Conditions of a oval: Notify Commission so that a representative may witness /) .~j ~~~) Sund Number: ~ (/ ry ~/ ~ J ^ Plu Inte rrt ^ BOP Test ^ Mechanical Int g g~ y egrity Test ^ Location Clearance Other. Subsequent Form Required: /6'y~~ f APPROVED BY Approved By: COMMISSIONER THE COMMISSION Date ~ Form 10-403 Revised 07/2000 " ' „I ~ Submit In Dup~'cate ~~ R I G I N A L ~ /e•lS~ag tf~~°~ ~ ~d•/3•0! ~~. • • To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission bp From: Ron Phillips CTD Engineer Date: October 06, 2009 Re: OS-25B Sundry Approval Sundry approval is requested to abandon the 05-25B well by setting a packer whipstock above the perforations. The history of 05-25B. We115-25B was drilled in October 2000 as a tiny-tool CTD sidetrack with 824' of Z1A perforations. The well reaching marginal GOR within 6 months. Additional perforations were added in November 2003 at 11,141' and 9,990' with no increase in oil or decrease the GOR. A CIBP was set at 10,060' and more add perfs were added in May 2004 with no change to GOR. A borax CNL log was run in May 2007 that indicated the well had no channels behind pipe. A SCMT log was also run that indicated good cement up to the liner top. A calliper log was run to 9,570' showing less than 13% wall penetration in the well. The well has a passing MIT-T, MIT-IA and MIT-OA. The tree was also replaced. The reason for side tracl~ is OS-25B produces above marginal with minimal remaining value. The proposed plan for OS-25B is to drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around November 20. 2009. The existing perforations will be isolated by a 3-1/2" packer whipstock and the primary cement job. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Pre-Rig Work: (scheduled to begin October 23, 2009). 1. S Dummy WS drift to 9,574'. 2. S Dummy GLV's. 3. E Set 3-1/2" Monobore packer whipstock 25ROHS at 9,550'. ~ 4. O MIT-IA 5. O AC-LDS; AC-PPPOT-T IO- ~j03 6. o pr Mv, sv, wv `~ 3 d~_3 5 ~ 7. O Bleed gas lift and production flowlines down to zero and blind flange. 8. O Remove wellhouse, level pad. t Rig Work: (scheduled to begin on November 20, 2009) ~i ~ T!~ ~'~' Z ~`~' ~a"~ 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Mi112.8" window at 9,550' and 10' of rathole. Swap the well to Geo-Vis. 3. Drill Build: 3.0" OH, 436' (20°/100) with resistivity. 4. Drill Lateral: 3.0" OH, 1,689' (12°/100) with resistivity. 5. Run 2-3/8" L-801iner leaving TOL at 9,360'. 6. Pump primary cement leaving TOC at TOL (9,360'), l l.l bbls of 15.8 ppg liner cmt planned. 7. Cleanout liner and MCNL/GR/CCL log. ~„~ Pk~ l~; p s ~ L~ PXR s~'t-t'~'~ ~- C w~-« 8. Test liner lap to 2,000 psi. w~ ~~ .f.~,~,`~F .~ r`.,.~ sQ...~ ~-c f!k Q~,,~„Ql 9. Perforate liner per asset instructions (~1,200'). ~ , o es b ~(- o.: ct ~ b ~ k t. ~ 7~~tr+~- 10. Plan on setting a LTP (only 190 of liner lap). ~~ ~ ~ ~~`~ n, ~~ ~ G~ 11. Freeze protect well, RDMO. ~' c + ° ~ ~"~`ij ~ o -- -- ~r T'~`" t~`t'f. ~`'/~ ~ '~'~ rc.•w ~..~ i~1 ras'~~",e3 ~~ d ,~ k~ •4.~ !o ~. rc..~.. u c.i e.•(~ 6 . f~ ~+~ 4~ ,t~ ~j•~.Qo ~~,~..a- j~ ~/G~ ~ir acc e~,f ~.b(<-• ~ ~ ~ ~~ /0•lSo~~ ~ ~ Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Generic GLV's 3. RU test separator, flow test well Ron Phillips CTD Engineer 564-5913 CC: Well File Sondra Stewman/Terrie Hubble ~- ~. 4° cmv W~LHEAD = FMC AC7UATOR = BAKER C KB. ~EV = 72.1' BF. ELEV = KOP = 4000' Max Angle = 98 @ 10169' Datum AAD = 9645' Datum ND = 8800' SS ~ SAFETY N : ORIG W ELLBORE & SDTRCK "A" ( 3- 1/2" SLTD~PBA'D w/CM~ *'* WELL ANGLE> 70° 0 ~ ~~ ~ ~ 9904' **" ~4-1/2" CAMCO BAL-O SSSVN, tD = 3.812" j ~ ~ 10-3/4" CSG, 45.5#, J-55 BTC, ID = 9.953" H 3490' Minimum ID =1.941" @ 9574' TOP OF 2-3/8" LINER GAS LIFf MAI~RB.S ST MD ND DEV TYPE VLV LATCH PORT DATE 1 2 3583 3826 3582 3824 2 5 KBMG-M KBAAG-M DMY SO BK BK 0 20 11/13/00 11/13/00 3893' H 7-5/8" X 4-1/2" BKR S-3 PKR, ID = 3.958" 8765' ~ 7-5/8" X 4-1 /2" BKR S-3 PKR ~= 3.958" $79$' 4-1/2" HES XN NIP, ~= 3.725" 4-1/2" TBG, 12.6#, L-80 BTGM, .0152 bpf, ID = 3.958" 7-5/8" CSG, 29.7#, L-80 BTGM, ID = 6.875" H 9220' 8818' ~ 7-5/S" X 5-1/2" BKR ZXP PKR w/ 6' TI~ACK I & HMC LNR HGR ~ = 4.892" 8820' 4-1/2" WLEG, ID = 3.958" $$40' 5-1/2" X 3-1/2" XO, ID = 2.992" 8874' 7-5/8" X 5-1/2" BKR HY-FLO II LNR HGR, ID = 4.892" 9574' H2•~0" BKR DEPLOY SLV, ID = 1.969" 3-1/2" WHIPSTOCK H 996T RA TAG 9972' PERFORATION SUA~AARY REF LOG: SWS CCUGR/MCNL ON 10129/00 ANGIE AT TOP P6ZF: 74° ~ 9926' Note: Refer to FToduction ~ for historical perf data SiZE SPF IMB2VAL Opn/Sqz DATE 1-11/16" 6 9926 - 9976 O 05/12/04 1-11 /16" 6 9990 - 10040 O 11 /22I03 1-11 /16" 4 10128 - 10300 C 10/31 /00 1-11/16" 4 10470 - 10700 C 10l31/00 1-11/16" 4 10858 - 11050 C 10/31/00 1-11/16" 4 11310 - 11540 C 10/31/00 1-11/16" 6 11141 - 11166 C 11/22/03 1-11/16" 6 11178 - 11203 C 11/22/03 5-1/2" LNR, 17#, L-80 FL4S, .0232 bpf, ID = 4.892^ 10031' 3-1/2" LNR 9.3#, L-SO NSCTlSTL, .0087 bpf, ID = 2.992° 11916~ 3-1/2" MILLOIff WINDOW (05-25B) 9970' - 9975' 10060' H 2-3/8" BKR GBP ~ C LNR, 4.6#, L-80 FL4S, .0039 bpf, ID = 1.941 ° H 11 DATE REV BY COMI~NTS DATE REV BY COMMB~TS 01/12/90 N28E ORIGINAL COM PLETION OS/12/04 KCF/KAK ADP@2FS & CORRECTIONS 08/27/96 D9 RWO - SIDETRACK 08/16/09 PJC ~tAWNVG CORRECTIONS 10/31/00 ? CTD - SIDEfRACK (05-258 08/16l09 ?/ PJC TR~ GO 05/07/01 CWKAK CORRECTIONS 09/24/03 JAF/TLP 5-1/2" CSG SHOE R~OCATION 05/11/04 KCF/KAK SET BKR CIBP PRUDHOE BAY UNff W~L: 05-256 P6~MfT No: R2001470 API No: 50-029-2198-02 SEC 32, T11 N, R15E, 2558' SIVL 8173' EWL BP Exploration (Alaska) T,~EF = . . WEILHEAD = ACYUATOR = KB. E1EV = BF. ELEV = KOP = Max Angle = Datum MD = Datum ND = 4" CIW ~ 0 5 2 5 C SAFETY NO S: ORIG WELLBORE & SDTRCK "A" ( 3- FMC ~ 1/2" SLTD~ P8A'D w/CM~ *** W ELL ANGLE > 70° K,2 , Proposed CTD Sidetrack 9904~ *** ~4-1/2" CAMCO BAL-O SSSVN, ID = 3.812" ~ 10-3/4" CSG, 45.5#, J-55 BTC, ID = 9.953" ~~ 3490~ Minimum ID =1.75" (a~ 9350' 4-1/2" TBG, 12.6#, L-80 BTGM, .0152 bpf, ID = 3.958" GAS LIFT MANDRELS ST MD N D DEV TY PE V LV LATCH PORT DATE 1 2 3583 3826 3582 3824 2 5 KBMG-M KBMG-M DMY SO BK BK 0 20 11/13/00 11/13/00 389~ 7-5/S" X 4-1/2" BKR S-3 PKR, ID = 3.958" 8765~ ~~ 7-5/8" X 4-1/2" BKR S-3 PKR, ID = 3.958" $79$' ~-~4-1/2" HES XN NIP, ID = 3.725" $$18' -i7-5/8"X5-1/2"BKRZXPPKRw/6'TIEBACK ~& HMC LNR HGR, ID = 4.892" 8820~ 4-1/2" WLEG, ID = 3.958" ~5-1/2" X 3-1/2" XO,ID = 2.992" ~ ~7-5/8" X 5-1/2" BKR HY-FLO II LNR HGR, ID = 4.892" ~ TSGR 9132' ~7-5l8" CSG, 29.7#, L-80 BTGM, ID = 6.875" ~ 9220~ I 1/2" LNR, 17#, L-80 FL4S, .0232 bpf, ID = 4.892" g272' / 30° PERFORATION SUMMARY REF LOG: SWS CCUGR/MCNL ON 10/29/00 ° ANGLE AT TOP PERF: 74° @ 9926' ~ 3 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-11/16" 6 9926 - 9976 O OS/12/04 1-11/16" 6 9990 - 10040 O 11/22/03 1-11/16" 4 10128 - 10300 C 10/31/00 1-11/16" 4 10470 - 10700 C 10/31/00 1-11 /16" 4 10858 - 11050 C 10/31 /00 1-11/16" 4 11310 - 11540 C 10/31/00 1-11/16" 6 11141 - 11166 C 11/22/03 1-11/16" 6 11178 - 11203 C 11/22/03 5-1/2" MILLOIff WINDOW (05-25A) 9272' 9350' 3-1l2" KB LTP ID = 1.75" 9360~ Top of 2-3/S" liner deployment sleeve 9550~ 3-1/2" monobore pkr w hipstock 9574~ ~-~ 2.70" BKR DEPLOY SLV, ID = 1.969" ~ ,:,_ . : -_ . y 2-3/8" L-SO Liner, Cemented 8 Perf'd 11675' 10~6~~ ~-~ 2-3/8" BKR CIBP 3-1/2" WHIPSTOCK 9967' \ RA TAG "72' •1 /2" LNR, 9.3#, L-80 NSCT/STL, .0087 bpf, ID = 2.992" 11916~ A ~~ 11544~ 2-3/8" LNR, 4.6#, L-80 FL4S, .0039 bpf, ID = 1.941" 11581 DATE REV BY COMMENTS DATE REV BY COMMENTS 01/12/90 N28E ORIGINAL COMPLETION 05/12/04 KCF/KAK ADPERFS 8 CORRECTIONS 08/27/96 D9 RWO - SIDETRACK 08J16/09 PJC DRAWING CORRECTIONS 10/31/00 ? CTD - SIDETRACK (OS-25B) 08/16/09 ?/ PJC TREE GO 05/07/01 CWKAK CORRECTIONS 09/22/09 MSE PROPOSm CTD SIDETRACK 09/24/03 JAF/TLP 5-1/2" CSG SHOE R~OCATION OS/11/04 KCF/KAK SE7 BKR CIBP B ~ PRUDHOE BAY UNff WH_L: 05-25C PERMff No: AR No: 50-029-2198-03 SEC 32, T11N, R15E, 2558' SNL 8~ 173' EWL BP Exploration (Alaska) ~~~~~~~~~~~~ ~~' > N0.5310 n ~ t ~,, `£2 ~ ~ +~" ~- . . A' F g`, ~~A ~ ~ ~ =?. ; 1 ~ ° l~laska Data 8~ Consulting Services ;:3:;. ~~~°~""`"~ Com an State of Alaska p Y~ 2525 Gambe1l Street, Suite a00 Alaska Oil & Gas Cons Comm lAnchorage, Alt 99503-2838 Attn: Christine Mahnken ~a~'Yf~: Beth 333 West 7th Ave, Suite+ 100 Anchorage, AK 99501 \Nell Job # Log Description Date BL Color CD 07/14/09 Z-20 AP3Q-00043 SBHP SURVEY - 06/17/09 1 1 P2-39 AZCM-00029 LDL G~ ~ O6/17/09 1 1 12-03 AY1M-00022 SBHP SURVEY 06/15/09 1 1 Z-74~ AYQQ-00036 TEMP SURVEY & BHP - 06/23/09 1 1 RI-16 AP3~-00042 SBHP St1RVEY ~ r 06/16/09 1 1 V~Q5_ _.. 11999053 USIT 10/12/08 1 1 ," N-91C ' _, . AP3Q-00042 SBHP SURVEY 06l16/09 1 1 , _ `'° -~3=12 AY3J-00030 LDL .~ 06/12/09 1 1 ~1-30 AVYS-00049 PRODUCTION PROFILE -(~j (j~ ~ 06/22/09 1 1 17-076 AYQQ-00031 SBHP SURVEY '~ / '3t5 06/11/09 1 1 05-256 AP3Q-00040 SBHP SURVEY pg/~1/pg ~ ~ ~-27A AXBD-00028 MEM INJ PROFILE O6/12/09 1 1 1 i-36 B14B-00066 CROSSFLOW & IBP ~ 06/23/09 1 1 ~-214 B14B-00065 SBHP SURVEY ' 06/21/09 1 1 _ ~-17' AYTU-00043 PROD PROFILE -/ O6/08/09 1 1 ~-25 /lWL8-00018 LDL '()~~ (}'~- 05/28/09 1 1 02-33B AYTU-00033 USIT f 05/19/09 1 1 P2-07 AVV5-00051 PRODUCTION PROFILE ~f ( 06/25l09 1 1 13-03 AWL8-00020 LDL 06/01/09 1 1 3-17F/IL-3Q B2NJ-00008 MEM INJ PROFILE (J O6/15/09 1 1 MPS-08 AYS4-00080 LDL O6/15/09 1 1 13-52 AViH-00019 LDL 07l05/09 1 1 01-25 AYTU-00046 USIT - ~(b 06/28/09 1 1 dV-39A AWLB-00023 STATIC TEMP SURVEY a" ~ O6/26/09 1 1 ~-35 AYTO-00022 SBHP SURVEY ~ ~ 06/29/09 1 1 Z-16 AV1H-00017 SBHP SURVEY ~ ()tj 06/29/09 1 1 18-20 6581-00004 lDL ~ ,-- ~ O6/27/09 1 1 Z-29 AVY5-00053 SBHP SURVEY '~f~ ~~ ~'~~ ~ ~7 ~': ; ~ ~ 07/03/09 1 1 L5-09 AYQQ-00032 RST - ~ C- (~ 06/13/09 1 1 07-10A B1JJ-00022 MCNL d~~ 05/26109 1 . d~r...~ ............ ~.-....... ..~..~.. .~.. .,...,~.~...a ..nv nc ~ vnnu~aa v~~c a.vr i or+~.n ~ v: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. '~ i j ~ `~ i ~ ' _, Alaska Data & Consuiting Services 2525 Gambell Street, Suite 400 A~chorage, AK 99503-2838 • ~ 09!27!07 Alaska Data 8~ Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 89503-2838 ATTN: Beth ~~~~3~~[~ ~10~I ~ °~ 200? weu Inh ~ 1 nn nn¢erin4inn NO. 4437 Company: State of Alaska Alaska Oil 8 Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe bay nam at rnln. rn • 15-29A 11686783 SCMT ab 09/05/07 1 05-25B 11630496 SCMT < 08!30/07 1 02-33A 11813082 SCMT 08/31/07 1 15-28A 11686782 SCMT 09/04/07 1 N-27 11824345 SCMT - ~ 09/12/07 1 05-22A 11813086 SCMT 09!18!07 1 S-400A 11855508 USIT - 09/18/07 1 E-27A 11676963 USIT (CEMENT) - 09/18/07 1 E-27A 11676963 USIT (CORROSIONS - 09/18107 1 MPG-07 11594520 USIT I - ' 08/29/07 1 MPS-37 N/A SCMT 09/08/07 1 PLEASE ACKNOWLEDGE RECEIPT 8Y SIGNING AND RETURNING ONE DOPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 ~-~. 900 E. Benson Bivd. ,l J €~ ~° &, . ~` ' Anchorage, Alaska 99508 it ~ .~. - Date Delivered: - ,,, > - • Alaska Data & Consulting Serv es 2525 Gambell Street, Suite 4 0 Anchorage, AK 99503-283 ATTN: Beth ,.~_~__ ~_ _ ~.,_ Received b is , , _.<< ;~'s4 '" ~ ~,;~ ~ E~°~rirli'I~i~~i~l°I .,r~;~.~~~: 08/15/07 Scblullberger NO. 4370 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 A TTN: Beth SCANNED AUG 3 12007 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott WI! J b# e 0 Log Description Date BL Color CD 04-02A 11695056 RST Iqq-/:JI .p /"",.<'-Tn 05/10/07 1 1 L2-24 11226014 RST t J7,(" 11r~-^q() :# 10/31/06 1 1 L3-05 11211583 RST I~S-Io,~" LC~""':/- 03/28/06 1 1 05-25B 11745222 MCNL .9Oö _ I(./~ ø' I <:~"'~ OS/27/07 1 1 C-36A 11628783 SCMT tJr" ~ - rv--.:::i 07/24/07 1 D-33 11649968 MEM LDL J C} (ð -117£,.., OS/27/07 1 GNI-02A 11676954 SBHP SURVEY U:r:t1 SO~ - liD¡ 07/14/07 1 2-04/M-19 11813068 PROD PROFILE áJ 1 1rl ~ - D"if ;:l 07/24/07 1 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. [1 Petrotechnical Data Center LR2-1. þ 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: AUG 2. '7 Z007 Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2 38 ATTN: Beth Received by: ''ìJa$ka Oil & Gas Cons. Commission l\nchcm:¡ge f6 . . F:\LaserFiehe\CvrPgs _ Inserts\M ierofi 1m _ Marker.doe MICROFILMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE "'.:"....i:......""";;,':':1t- ....... :\. 'I;~::'- . ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon D Alter Casing 0 Change Approved Program 0 2. Operator SuspendD Repair Well 0 Pull Tubing 0 Operation Shutdown D Plug PerforationsD Perforate New Pool D 4. Current Well Class: Perforate ŒI WaiverD Stimulate 0 Time ExtensionO Re-enter Suspended WellO 5. Permit to Drill Number: 200-1470 OtherD Name: BP Exploration (Alaska), Inc. 72.13 8. Property Designation: ADL-0078326 11. Present Well Condition Summary: Development I]] Stratigraphic D 9. Well Name and Number: 05-25B 10. Field/Pool(s): Prudhoe Bay Field I Prudhoe Oil Pool Exploratory 0 Service 0 6. API Number 50-029-21988-02-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Total Depth measured 11582 feet true vertical 9044.7 feet Plugs (measured) Effective Depth measured 11544 feet Junk (measured) true vertical 9044.0 feet Casing Length Size MD TVD Conductor 80 20" 101.1# H-40 41 121 41.0 121.0 Liner 1164 3-1/2" 9.3# L-80 8806 - 9970 8129.6 - 9042.8 Liner 1102 5-1/2" 17# L-80 8868 - 9970 8183.0 - 9042.8 Liner 2007 2-3/8" 4.7# L-80 9574 - 11581 8808.3 - 9044.7 Production 9875 7-5/8" 29.7# L-80 39 - 9914 39.0 - 9029.6 Surface 3444 1 0-3/4" 45.5# J-55 40 - 3484 40.0 - 3483.1 Perforation deDth: None None Burst Collapse 650 10530 6280 11780 4790 2090 1650 10160 7740 11200 6890 3580 Measured depth: 9990 -10040,10128 -10300,10470 -10700,10858 -11050,11141 -11166,11178 -11203,11310 -11540 True vertical depth: 9045.71 - 9051.56,9044.5 - 9031.14,9023.96 - 9028.62,9026.96 - 9040.76,9043.32 - 9045.11,9046.12 - 9047.91 9049.85 - 9043.94 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 38 8820 ~, >, '~",',"",','" C' """. E,,"'" ~.<~ /' E"'" ~'~"", \,..(1 ,¡..,... '. ~. ' , ~II ~ ,~ :j "J, ~~r!IiII ' :'!II' ~rwtmI ~ '., "I.~Ir.v ~'''~,.-:{ MAR 0 4 2004 Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer 4-1/2" Baker S-3 Perm Packer 5-1/2" Baker ZXP Hydro Set Packer @ 10784 @ 9421 @ 9517 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Am;,~ûŒgil" 13 Prior to well operation: Subsequent to operation: Oil-Bbl Gas-Met Water-Bbl CasinQ Pressure TubinQ Pressure 961 35.7 0 795 1116 802 37 0 753 1185 Remesentative Dailv Averaae Production or Iniection Data 14. Attachments: 15. Well Class after proposed work: ExploratoryD Development[! Service D Copies of Logs and Surveys run- 16. Well Status after proposed work: Operational Shutdown D Oil I]] GasD WAG 0 GINJD WINJD WDSPLD Prepared by Garry Catron (907) 5'64-4657. Sundry Number or N/A if C.O. Exempt: N/A Daily Report of Well Operations. ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron Signature Title Production Technical Assistant Form 10-404 Revisec6W\NNED MA~~ ], 5 2004 Date 2/26/04 røJMS BFt. .¡O~5 ,. 05-258 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/21/03 Perforate 11141'-1116616 SPF, 111781-1120316 SPF 11/22/03 Perforate 9990'-10040' 6 SPF FLUIDS PUMPED BBLS 137 1 % KCL 110 60/40 Methonal 247 TOTAL Page 1 TREE = 4-1/16" rv'CBI OY 5M WELLHEAD = FMC A CTliA. TOR = OTIS KB. 8.. EV = 72.1' BF. ELEV = KOP= 4000' Max Angle = 98 @ 10169' DatumMD= 9645' DatumTVD = 8800' SS 05-258 SAFETY NOTES: 05-25A SIDETRACK 3-1/2" SL TD LNR P&A'D W/CMT. 05-25B GOES HORIZONTAL @ 10045'. 10-314" CSG, 45.5#. J-55 BTC, 10 = 9.953" Minimu m ID = 1.969" @ 9574' BAKER DEPLOYMENT SLV 14-112" lEG, 12.6#, L-80 BTeM, 10 =3.958" 1 7-5/8" X 5-1/2" BKR ZXP LNR HGR A<R W/6'TIEBAO< SLY, 10 = 4.892" 7-5/8" X 5-1/2" BKR HY-FLO II LNR HL\NGER, 104.892" 17-518" CSG, 29.7#, L-80 BTeM, 10 = 6.875" I PERFORATION SUMMA. RY REF LOG: SWS CQ./GRlrv'C1\I... ON 10/29/00 ANGLE AT TOP PERF: 98@ 10128' t-bte: Refer to A"oduction DB for historical perf data SIZE SPF INTER\! AL OpnlSqz DAlE 1-11/16" 4 10128 -10300 0 10/31/00 1-11/16" 4 10470 - 10700 0 10/31/00 1-11/16" 4 10858 - 11050 0 10/31/00 1-11/16" 4 11310 -11540 0 10/31/00 5-1/2" LNR, 17#, L-80 FL4S, .0232 bpf, 10 = 4.892" 10031' 3-1/2" LNR, 9.3#, L-80 NScr/STL, .0087 bpf, 10 = 2.992" 11916' (8 2189' 4-1/2" CAMCO BAL-O SSSVN, 10 = 3.812" GAS LIFT MA.NDRB..S ST MD lVD DEV TYPE VLV LATCH FORT" DATE 1 3583 3516 0 KBMG-N DV BK 08/28/96 2 3826 3758 8 KBMG-N SO BK 08/28/96 7-5/8" X 4-1/Z' BAKER &3 PKR, 10 = 3.958" 7 -5/8" X 4-1/2" BA KER &3 PKR, 10 = 3.958" 4-1/2" HES XN NP, 10 = 3.725" 4-1/2" WLEG, 10 = 3.958" 1-1 EUv1) TTL NOT LOGGED 1 5-1/2" X 3-1/2" XO, 10=2.992" -12.70" BA KER DEROY IVENT SLV, [) = 1.969" I 1 9967' 1-1 TOP OF WHIPSTOCK 1 1 9972' 1-1 RA TA G I 3-112" MLLOUTWINDOW 9970' - 9975' ~-I 11544' I BKR O-RING SUB/FLAPÆR 10 = 1.000" 2-318" LNR, 4.6#, L-80 FL4S, .0030 bpf, 10 = 1.995" DAlE REV BY COMMENTS DATE REV BY COMMENTS 01/12/90 ORIGINAL COMPLETION 08127/96 RWO- SIDETRACK 10/31/00 CTD . SIŒTRACK 05/07/01 CH/KA K CORRECllONS 09/24/03 JAF/lLP 5-1/2" CSG SHOE R8..OCATION PRUDHOE BAY U\l1T WELL: 05-258 PERMT t-b: 2001470 API t-b: 50-029-2198--02 SEC 32, T11 N, R15E, 2558' SNL & 173' EWL 8P Exploration (Alaska) .. 1300'- ILI::r ( ( WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7thStreet Suite # 700 Anchorage. Alaska 99501 RE: ~istribution - Final Print[s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson BP Exploration (Alaska), Inc. ProActive Diagnostic Services, Inc. Petrotechnical Data Center LR2-1 P. O. Box 1369 900 E. Benson Blvd. Stafford, TX 77497 Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM COLOR Open Hole 1 1 1 Res. Eva!. CH 1 1 1 DS05-25b 11-20-03 Mech.CH 1,~~¿ \ .~ ~ Caliper Survey Signed: ~~~ !~..,ç.O'JL~ Date: Print Name: RECEIVED J;\f'J 20 2004 .Alaska Oil & Gas Cons. Commis8lon Anchorage PRoAcTivE DiAGNOSTic SERvicES, INC., PO Box 1 }69 STAffoRd IX 77477 Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds@memorylog.com Website: www.memorylog.com f.!;,'/'Î' t!ddlt¡.\~. C:~":..''':\ ¡i~\r'U''i).: t::ì C\'1J '1no~ ,\:J)\k?tK\~1\G~a;;.[b... I" t. U ~J ~ C)J (.a' ~~~.",,\& Permit to Drill 200147'0 DATA SUBMITTAL COMPLIANCE REPORT 111612003 Well Name/No. PRUDHOE BAY UNIT 05-25B Operator BP EXPLORATION (ALASKA) INC MD 11582 _ TVD 9045 - Completion Dat 10/31/2000 """- Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-21988-02-00 UIC N REQUIRED INFORMATION Mud Log N_.~o Sample N._~o Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt Interval Log Log Run OH I Name Scale Media No Start Stop CH (data taken from Logs Portion of Master Well Data Maint 9308 11542 Case Dataset Received Number Comments 4/26/2001 1006~-¥1~2 ................ ED D R C L Pro Production D R C L L L R D 9985 11582 Open I 9520 11541 Case ~¢l~/~urvey Report FINAL Mt/VD Survey R~port FINAL 9971 11581 10064 ~ FINAL 9308 11542 ch _ Th~,~'~Neutron 2 FINAL 9308 11542 oh F..,~CI_/GRJMCNL '~ GR I FINAL 9980 11582 OH J~41~R 2/5 FINAL 9980 11582 OH LIS Verification FINAL 9985 11582 CH 10158~'''''~ FINAL 9985 11582 OH 4/29/2002 2/2/2001 Digital Data 2/2/2001 9/971-11581 Paper Copy 5/3/2001 10064~' 9308-11542 Digital Data 5/3/2001 9308-11542 BL, Sepia 6/22/2001 9980-11582 BL, Sepia 6/22/2001 9980-11582 BL, Sepia 6/22/2001 9985~..1-1582 LIS Verification 6/22/2001 101584'9985-11582, Digital Data Well Cores/Samples Information: Name Interval Dataset Start Stop Sent Received Number comments ADDITIONAL INFORMATION Well Cored? Y / N Chips Received? Y / N Analysis Y / N R ~.m~.iv~.d ? Daily History Received? Y I N Formation Tops (~) N Comments: Permit to Drill 2001470 DATA SUBMITTAL COMPLIANCE REPORT 1116~2OO3 Well Name/No. PRUDHOE BAY UNIT 05-25B Operator BP EXPLORATION (ALASKA) INC APl No. 50-029-21988-02-00 MD 11582 TVD 9045 Completion Dat 10/31/2000 Completion Statu 1-OIL Current Status 1-OIL UIC N Compliance Reviewed By: Date: TRANSMITTAL ProActive Diagnostic Services, Inc. To' State of Alaska AOGP~ 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution - Final PHnt{s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska], Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGffAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM COLOR Open, Hole 1 1 1 DS 05-25B 4/15/OP Res. Eval. CH 1 1 1 Mech. CH 1 Caliper Survey Print Name: Date · RECEIVED APR 2 9 · ,002 Alaaka0il&G Cms. C mion ProActive Diagnostic Services, Inc., 3 IO K Smeet Suite 200, Anchorage, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage~mcmorylog.com Website: ~,vww. mcmorvlo~.com Transmittal Form BAKER HUGHES Baker Atlas Canada GEOSciences Centre To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Attention: Lisa Weepie Reference: Pmdhoe Bay North SlOpe, Alaska 05-25B ~.'.i.i. ;.;;. , . ]],,z .......... -:. ..... · ,,,t.,.,,:.. ·, Contains the following:" . '. , . ..'. . . ... . ,. .... , .'. 1 LAS Format disk.' iI:'.: .: .',...'. ..:~.. .:" .-.. :,,..... '.'.,:.,~.. :,..' "...:,.i:..:.'i,. '1 Film '"'",.'":. :.:'" '."": ''~'' .'. '.'.'i'~" ..... :'":::'""i'i":':':'"" . ..: '.,': . .:,..,..., ...'.:':' ' '.i .. ,'. ,, ..,,.~...,.'.'.:: ..i,' ~ ~~ar~q,~ a~'.~nt..~.''' .''. '.'.:' :;:..:!~..!..: ...:. .:.. ~'... ...:.:.. ~ 1 TVD-GR print ?'ii'.'?.:,'!iii:'"'.:'":'",,.".'::i.,~:',:.':":'":,~.".' :,:.,:. ":':". .. .,,., ....~ : ,.. ..: .~: .,,. ........ .,'.' '.?i' :.:.:.'.".'.":'!,:.' '"'..,.':..'.:'.'""'").':'"'. ".'"' '('.'","':':[': ::~....~?.?. :.:: .... ..........'~:'?':",:...~,...... .... ........... ! !..'.~'.. :, ~.~i :...,..,.". '"..~'..'~ i~,;~;~...:..' ~~'''': :'~' ;..!,':::"". ii" .... :' ..... "" ~' '!} i i?,:.".':.~.. ':'.i :.'~":.'...... ........ '~..' ~.'~':,...::': ' '"',. ?'.i: · .. ,.., .:.":i':,:." '. " '...' .""..:i: .'i.':... '.'.'i."...:' 'i....::.:...i.)':'.: !:iii..'i~:' ":?.;':..i.:..).~;i .... .'i :':::,:;' ::..,:,'::'::"~ :..i:ii. ........ ...................... ', ' Sent By: Josef Bf~rg. . Date: June 18, 200.1 Received ' . t Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING A COPY TO BP EXPLORATION. (ALASKA) PETROCHEMICAL DATA CENTER 900 E. BENSON BLVD. ANcHoRAGE, ALASKA 99508 Baker Atlas #1300, 401-9th Ave. S.W. Calgary, Albert a, Canada T2P 3C5 Direct: (403) 537-3752 FAX: (403) 537-3767 ~,a Oil & Ga~ C(m. Comndnkm ~nchofage 04126101 Schlumberger Alaska Data & Consulting Services 3940 Arctic Bird, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrle '--NO. 1102 Company: . . State of Alaska Alaska Oil & Gas Cons Corem Attn: Lisa Weepie 333 West 7th Ave, Suits 100 Anchorage, AK 99501 Field: Prudhoe Bay V' Color Well Job # Log Description Dats Blueline Sepia Prints CD D.S. 5-25B ,~O~)-/~'~ 20472 MCNL 10/29/00 .. D.S. 15-12A~.~ Ob-(~(~ I 20372 MCNL 08131100 I I '1 .. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: RECEIVED 0,5, 2001 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorages.AK 99503-5711 ATTN: Sherrie t STATE OF ALASKA (" ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil r~ Gas D Suspended D Abandoned D serviceL [~.~.TtONS~ 2. Name of Operator. .,.1~~~_ 7. Permit Number BP Exploration (Alaska), Inc. im 200-147 3. Address l~' ~,,';~,~_ 8. APl Number P. O. Box 196612 Anchorage, AK 99519-6612~ 50-029-21988-02 4. Location of well at sudace 9. Unit or Lease Name 2556' FNL, 5106' FEL, Sec. 32, T11N, R15E, UM (asp's 697246, 5948889) ~'' '~":':' ~':".' ":"-'..';:.-~--'"""- -- - Prudhoe Bay Unit At Top Producing Interval ! .... "; 10. Well Number ' _.Z'.~ .-...~.Z:_ .~O; 05-25B 3600' FNL, 2576' FEL, SEC 31, T11 N, R15E, UM (asp's 694529, 5947776) ..... .:: -. At Total Depth',A~-l*z---:''~''~'--'-- ~ 11, Field and Pool 3801' FNL, 4055' FEL, SEC 31, T11N, R15E, UM (asp's 693056, 5947536) ...... . ............. Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No. RKB 72.13 feetI ADL 28326 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date~~ComD. SusD. Or Aband~j~ 115. Water Depth, if offshore 16. No. of Completions October 20, 2000 October 28, 2000 I~00 I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 11582' MD / 9045' TVD 11544' MD / 9044' TVD YES ~] No DI 2189' feet MD 1900' (approx) 22. Type Electric or Other Logs Run MWD GR & Mem GR/CCL/CNL 23. CASING, LINER AND CEMENTING RECORD SE'I-rING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 101 # H-40 Surface 110 30" 2150# Poleset 10-3/4" 45.5# J-55 Surface 3490' 13-1/2" 1000 Sx cs III, 350 sx Class G, & 157 Sx CS 7-5/8" 29.7# L-80 Surface 9220 9-7/8" 410 Sx Class G 5-1/2" 17# L-80 8874' 9272' 6-3/4" 155SxClassG r~ r-~ i ~,~ ,, . 2-3/8" 4.6# L-80 9574' 11581' 3" 16.Sbbls15.eppgLARC .... v I I ~J J"~t L 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 8820' 3893' 10128'- 10300' MD; 9044.5' - 9031' TVD; @ 4 SPF 8765' 10470' - 10700' MD; 9024' - 9029' TVD; @ 4 SPF 10858' - 11050' MD; 9027' - 9041' TVD; @ 4 SPF 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11310' - 11540' MD; 9050' - 9044' TVD; @ 4 SPF DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See Sidetrack Summary for details) 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 16, 2000 Gas Lift Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I 11/20/2000 6.0 Test Period > I 9665 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (coif) Press. -1389 psi 24-Hour Rate > 2356 22771 72 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. REC~.~ jVEE * This 10-407 is submitted as directed per the 10-401 form approved September 28, 2000 (Permit ~200-147) DE C 1 5 ~000 Alaska 0il & Gas Cons. Cornmi<,~ Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovere~t and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top of Sag River Sand 9126' 8405' Top of Shublik 9170' 8442' Top of Sadlerochit 9256' 8514' Top of Zone lA 10004' 9046' 31. LIST OF ATTACHMENTS Summary of 05-25B CT Sidetrack Drilling Operations + End of Well Survey. 32. I hereby certify that the following is true and correct to the best of my knowledge. S igned~-,, ~ ,,~.Lf~~ Title Coil Tubin,q DrillinR En,qineer Date /'~'~,~ C,~ Lamar Gantt / ' ' /" Prepared by Paul Rauf 564-5799. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24'. If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 10/12/2000: Service unit CTU on location. RIH & set TIW Whipstock Tray. POOH. RIH & tagged top of Whipstock @ 9964' CTM. Milled window & 10' of FM to 9982'. Dressed window interval & POOH. FP'd well & RD CTU. 10/18/2000: 10/1912000: 10/20/2000: MIRU Nabors CDR1. Rig accepted 0700 hrs. Continued MIRU. PT'd BOPE. RIH w/bi-centered bit, tied in w/GR Log, & tagged BTM @ 9987' MD. TOW = 9975'. Milled to 10231' & POOH. 10/2112000: RIH & drilled to 10700'. POOH. 10/22/2000: RIH & drilled to 10893'. PUH f/GR tie in. 10/2312000: 1012412000: POOH. RIH w/Crayola Mill & dressed window interval. POOH. RIH w/Window Mill & dressed window interval. POOH. RIH w/BHA. 10/25/2000: RIH & reamed to BTM @ 10872'. Drilled ahead to 11317'. 10/26/2000: Drilled to 11365'& POOH. PT'd BOPE. 10/27/2000: RIH & drilled to 11512'. POOH. 10/28/2000: RIH & drilled to TD @ 11582'. Conditioned hole for liner run. POOH. 10/2912000: MU & RIH w/2-3/8" 4.6# FL4S L-80 liner. Landed Liner @ 11581'. TOL = 9574'. Dropped ball & verified disconnect f/liner. Pumped 16.5 bbls of 15.8 ppg Latex Acid Resistive Cement to cement liner in place. Good returns during cement job. Unstung f/BDF & contaminated cement w/ Biozan. Cleaned out to BDF. POOH w/CT. 10130/2000: 10/31/2000: 1110112000: RIH w/Mem GR/CNL/CCL tools & logged well to PBTD @ 11544'. POOH. MU perf guns. RIH w/CT conveyed Perf guns & shot 824' of Initial Perforations f/: 10128'- 10300' MD (Zone lA) 10470'- 10700' MD (Zone lA) 10858'- 11050' MD (Zone lA) 11310'- 11540' MD (Zone lA) Used 1-11/16" carriers & all shots @ 4 SPF, random orientation, & overbalanced press. POOH w/guns - ASF. FP'd well. RD CDR1. Rig released 2100 hrs. Completed RDMOL. Placed well 05-25B on initial production & obtained a valid well test. Sidetrack Summary Page I ObP BP Amoco Baker Hughes INTEQ Survey Report INTEQ Site: PB DS05 We~: 05-25 .' WeEpam: 05-25B '" Dam: . 1118/2001 ' 'Ilam 14'.24:5'/ C~-m~llaatt(N~ P. efm: Well: ~5, Tm V~ ~) ~~ ~: 25 7~1~ ~:~ ~1 ~. ~ ~ W~l (0.~0.~.~) ' ~ ~~ M~ M~ ~ ~: O~ Field: Prudhoe Bay North Slope UNITED STATES Map System:US Slate Plane Coordinate System 1927 Gee Datum: NAD27 (Clarke 1866) SYS Datum: Mean Sea Level Map Zone: Naska, Zone 4 Coordhate System: Well Centre Geomagnetic Model: BGGM2000 Site: PB DS 05 TR-11-15 UNITED STATES: North Slope Site Position: Northhg: From: Map East'mg: Positiou Uucertaluty: 0.00 ff Grouud Level: 0.00 ft 5947200.70 ff Latitude: 70 15 35.696 N 697428.91 ff Longitude: 148 24 14.424 W North Refereuce: True GrM Convergence: 1.56 deg Well: 05-25 Slot Name: 25 05-25 Well Positton: +NI-S 1688.28 ft Northhg: 5946888.67 ft Latitude: 70 15 52.300 N +F,/-W -138.85 ft Easttng: 697245.85 ft Longitude: 148 24 18.465 W Position Umeemtnty: 0.00 ft Wellpath: 05-25B Drilled From: 05-25A 500292198802 Tie-on Depth: 9971.00 ft Current Datum: 50: 25 7/29/1996 00:00 Height 72.13 ff Above System Datum: Mean Sea Level Mtgsetle Data: 9/12/2000 Deellnatten: 27.03 deg Field Strength: 57488 nT Mag Dip Angle: 80.78 deg Vertical Section: Depth From (TVD) +N/-S +F,/-W Dtrectlon 0.00 0.00 0.00 260.00 Sur~ey: MWD Start Date: 12/7/2000 Measured While Drilling Company: Baker Hughes INTEQ Engheer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path , ,,..., , . ..... . Annotation "".' '::MD ..... : ."~D'"" ':' '. '"', '"' '"' "'.' ' ......." '"": ..... :," ~'"'":'"' ' ' ~971.00 ~.95 Kick-offPoint ' .::.'i".::,, ':....:..: ~,:':,., ,.,..,...,,.'i ..: ': I 11581.99 9044.70 Projected to TD SuFvey 1":''.,'"'"=.': MD. :,/-"',:'~i .-":,"lid ,::~ ",,, ,': ,.'~:,,'"."='. :.: '.;':.?TVl)~,::'."':.i'"',~.~:,,:' SSTVI),'.:',.';' "..,:"'ft.,"N/S'::':'::i' ,.'.' :: .... '"' .F,/W,: ': ",' '"':" :":'.'", MipN:'':'.'''''''' ':"','..'" MipE,.'""',~ '"": '! :'DLS', '',', ',. ',' .1,:' :':'.: a""...'"': ','='' ~'.. ,.' .: : ill'SdS' '.;:'' '.' .1' , ~,~ :if't:: ~," ~' . ".'.' '~"~'~" ,~1 ~,~:"'" f' ,.',,.' '':.. :'..,',:.~ . ..~;~' :' ~'~' ::'~:,': .'.'::' '., ' ' ,,.,,, ....;,.. ':'.,:'ft?,.,.'.:."i':" :':':~:.':'":'".ft?".: .":,':'..,,,:'::"": '.":.ft,'..", .' "'.::,,',:,.:' degll00ft',. :': ..fi:.:.:"."::.":. 9971.00 81.76 202.83 9042.95 8970.82 -1010.74 -2732.97 5947806.74 694540.45 0.00 2866.96 10011.00 81.47 211.95 9048.80 8976.67 -1045.84 -2751.15 5947771.18 694523.20 22.58 2890.96 10045.00 88.68 216.17 9051.72 8979.59 -1073.87 -2770.11 5947742.66 694504.98 24.54 2914.50 10082.00 95.44 225.66 9050.39 8978.26 -1101.77 -2794.28 5947714.14 694481.55 31.46 2943.15 10104.00 97.91 231.63 9047.83 8975.70 -1116.20 -2810.67 5947699.28 694465.54 29.20 2961.80 10169.00 98.00 249.60 9038.76 8966.63 -1147.65 -2866.53 5947666.38 694410.53 27.38 3022.27 10204.00 94.20 257.70 9035.03 8962.90 -1157.43 -2899.89 5947655.73 694377.44 25.44 3056.82 10243.00 89.91 261.52 9033.64 8961.51 -1164.46 -2938.21 5947647.70 694339.32 14.72 3095.78 10270.00 91.58 258.24 9033.28 8961.15 -1169.66 -2964.69 5947641.81 694312.99 20.51 3122.76 10305.00 97.47 252.02 9030.52 8958.39 -1179.19 -2998.23 5947631.40 694279.71 20.68 3157.45 10338.00 96.85 258.20 9026.41 8954.28 -1168.15 -3029.71 5947621.62 694246.47 12.71 3190.01 10375.00 94.21 260.81 9022.84 8950.71 -1195.49 -3065.79 5947613.34 694212.60 14.31 3226.81 10414.00 89.64 250.81 9021.53 8949.40 -1201.71 -3100.26 5947506.12 694174.31 11.72 3265.77 10460.00 86.94 263.98 9023.27 8951.14 -1207.79 -3149.81 5947598.54 694128.94 10.42 3311.69 10501.00 85.86 271.01 9026.16 8954.03 -1209.58 -3190.64 5947595.99 694068.17 17.11 3352.21 10528.00 85.78 274.68 9028.13 8956.00 -1208.20 -3217.53 5947598.56 694061.26 14.30 3378.45 10561.00 83.40 280.50 9031.25 8959.12 -1203.81 -3250.07 5947500.20 694028.61 18.42 3409.73 10596.00 83.80 284.00 9035.15 8983.02 -1198.43 -3284.06 5947606.69 693994.45 10.00 3441.92 (' O BP Amoco bO Baker Hughes INTEQ Survey Report Csmlm~)-: BP ~ l)~t~: 1/18/2001 ~ 14:24:5'/ i'Ve: · 2 ~: ~ ~ ~.~ ~ ~: 0~25, T~ ~ ~ ~ ~ ~ Y~l ~) ~m~ ~: ~ 7~1~ ~ ~1 w~ ' ~ ~. ~ ~ ~l' (0.~o.~.~) W~: ~2~ ~~h~ ~: M~ ~ ~: O~ S,,rvey ~t ds; d.; ~t ~t ~t ft ' ~t,, , it ~~ ~t, 10628.00 91.80 285.40 9036.38 8964.25 -1168.32 -3314.96 5947613.98 693963.35 25.38 3470.95 10661.00 97.50 288.90 9033.70 8961.57 -1178.63 -3346.37 5947622.85 693931.69 20.25 3500.20 10705.00 97.47 290.70 9027.97 8955.84 -1163.85 -3367.42 5947636.54 693890.28 4.06 3538.05 10747.00 94.39 292.45 9023.63 8951.50 -1148.49 -3426.26 5947650.88 693851.05 8.42 3573.64 10772.00 90.53 290.35 9322.56 8950.43 -1139.38 .3449.51 5947659.38 693827.57 17.57 3594.95 10805.00 86.60 287.50 9023.38 8951.25 -1128.68 -3480.70 5947669.25 693796.11 14.71 3623.82 10843.00 85.90 286.50 9025.87 8953.74 -1117.50 -3516.96 5947679.38 693759.57 3.21 3657.60 10870.00 85.69 284.37 9027.85 8955.72 -1110.43 -3542.92 5947685.87 693733.44 7.91 3681.92 10905.00 84.11 280.90 9330.96 8958.63 -1102.81 -3576.93 5947692.60 693699.24 10.68 3714.09 10958.00 84.72 272.77 9036.13 8964.00 -1096.54 -3629.26 5947697.50 693646.77 15.31 3764.53 11012.00 87.01 265.03 9040.03 8967.90 -1097.57 -3683.06 5947695.05 693593.01 14.91 3817.70 11041.00 90.08 262.22 9040.76 8968.63 -1100.79 -3711.67 5947691.08 693564.30 14.35 3846.63 11067.00 89.62 260.81 9040.79 8968.66 -1104.63 -3737.58 5947686.57 693538.70 5.51 3872.62 11098.00 88.06 255.95 9041,36 8969.23 -1110.60 -3767.99 5947679.50 693508.46 13.68 3903.60 11133.00 87.00 252.70 9042.87 8970.74 -1119.76 -3801.73 5947669.77 693474.98 12.50 3938.41 11170.00 85.00 247.80 9045.45 8973.32 -1132.22 -3636.46 5947655.40 693440.59 14.27 3974.78 11202.00 86.40 243.90 9047.85 8975.72 -1145.27 -3865.57 5947642.58 693411.63 12.92 4005.71 11243.00 68.30 236.90 9049.75 8977.62 -1165.49 -3901.15 5947621.44 693376.79 17.67 4044.27 11286.00 90.50 239.40 9050.20 8978.07 -1168.18 .3937.67 5947597.81 693340.68 7.74 4064.17 11316.00 91.31 245.30 9049.73 8977.60 -1202.09 -3964.23 5947583.20 693314.70 19.65 4112.74 11359.00 91.58 251.33 9048.64 8976.51 -1217.97 -4004.15 5947566.29 693275.20 14.03 4154.82 11408.00 93.43 258.01 9046.50 8974.37 -1230.91 -4051.34 5947552.12 693228.38 14.13 4203.53 11465.00 91.49 264.69 9044.05 8971.92 -1239.46 -4107.60 5947542.09 693172.36 12.19 4260.43 11491.00 90.20 269.60 9043.68 8971.53 -1240.76 -4133.55 5947540.12 693146.45 19.52 4286.22 11550.00 68.94 268.55 9044.11 8971,98 -1241.71 -4192.55 5947537.62 693067.51 2.78 4344.47 11582.00 88.94 268.55 9044.70 8972.57 -1242.52 -4224.53 5947535.97 693055.56 0.00 4376.11 ::?E a. ~ N I ~it~ ~ 1'0' ~ ......... ~ \ \ 8 'oo"' \ ~ ..... -,,- \ 0.. -- -t'--. 0 ~ , ' - . ,-8 0 --- '-' J 'i: 8 ¡ ~ ~ i . rt1 . .o.§!!!. ¡: ¡ ¡ ¡ '? Ii F ~ ¡ Q :<¡:<;~ . ... --- ~ ~~~œ "J J:"'J:J: ¡ \ '. . 0:<500 . \ ¡ .......... . 8 ]' . ~ g t:!. IL-~-'" 0 ~ 0$ ~... .. .... ... == fIr ¡~ i '.'.'. .... ... ,.......... Ii ¡ 8 + . ==r. 0 ö 6 0 0 0 0 '" 0 ~ ~ N !II!II~OIJ!jI {+II Jol\Il(-II ~"'os $¡ €;:¡ £ ;:; 0 '" ~ " z . . H $ ~. g ",':ô8ø Iii ~ 0 8 ð J;~;;og¡¡ ~ ~ .... Q 111 ¡:: ~¡¡¡ga¡3 em~ ~ ~ g~s£:!u 0 ~ "'0 æË¡(J:;;S I! " ~ ~*.:. N~ W :s:~g~ 'C u HHH HH II'> 1'5 88888 0 ... '" CCC¡¡;'¡; -, 91 tJ: ]UH . Æ~ :J! &1££&1 § ~ 1~ @ô1iJ'¡;jij ~ ¿ or ~~l] ~ ~ g~ $:::'o"w a ;:;; ~81'Jœu ~ ~. HJ¡~ o~; ~ o:;¡ ~ ~~ 00 õ u ~ ~ 4~d6a ¡1!:>!lJ6J\ "'Ul íï ALASI~A OIL AND GAS CONSERVATION CO~ISSION TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Thomas McCarty CT Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit 05-25B BP Exploration (Alaska) Inc. Permit No: 200-147 Sur Loc: 2558'SNL, 173'EWL, Sec. 32, T1 IN, R15E, UM Btmhole Loc. 3767'SNL, 4130'WEL, Sec. 31, TllN, RI5E. UM Dear Mr. McCarty: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redfill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Commissioner BY ORDER OF THE COMMISSION DATED this 2. at' ~ day of September, 2000 dlf/Enclosures CC: Depamnent of Fish & Game, Habitat Section w/o encl. Depart~nent of Enviromnental Conservation w/o encl. STATE OF ALASKA.[ ~/~.~., · ALAS.. CONSE VAT, ON COM,, ,ON PERMIT TO DRILL 20 AAC 25.005 la. Type of work B Drill ~1 Redfill 11 b. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 72.13' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL ~o,~?.~'~. 4. Location of well at surface ~, v/' ~ 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2558' SNL, 173' EWL, SEC. 3 T11N, R15E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 3230' SNL, 2395' WEL, SEC. 31, T11N, R15E, UM 05-25B Number 2S100302630-277 At total depth 9. Approximate spud date 3767' SNL, 4130' WEL, SEC. 31, T11N, R15E, UM 09/23/00 Amount $200,000.00 12. Distance to nearest property line 1la. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) Cz~.~c~X~yADL~878' MDI No Close Approach 2560 11674' MD / 8965' TVDss 16. T6 be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 10000' MD Maximum Hole Angle 97 ° Maximum surface 2254 psig, At total depth (TVD) 8800' / 3310 psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casin.q Wei.qht Grade Couplin.a Lenath MD TVD MD TVD (include sta.qe data) 3" 2-3/8" 4.39# L-80 FL4S 2074' 9600' 8752' 11674' 8965' ¢4 sx Class 'G' 19. To be completed for Redrill,Re-entry, and Deepen Operations. "~ Present well condition summary Total depth: measured feet Plugs (measured)SEP1 9 000 true vertical feet Effective depth: measured feet Junk (measured) Alas|~a CI{.~ & Gas C6~1s, Co~J$$jo~ true vertical feet Anchorage Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 2150# Poleset 110' 110' Surface 3457' 10-3/4" 1000 sx CS III, 350 sx 'G', 157 sx CS 3490' 3489' Intermediate 9187' 7-5/8" 410 sx Class 'G' 9220' 8483' Production Liner 398' 5-1/2" 155 sx Class 'G' 887,4,' - 9272' 8188' 8527' Liner 3098' 3-1/2" 135 sx Class 'G' & Uncemented 8818 - 11916,/ 8140' - 9055,-/ Perforation depth: measured Slotted Liner: ,0~,,'- ,,,,,' ORIGINAL true vertical Slotted Liner: 9045' - 9055' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Thomas McCarty, $64-5697 Prepared By Name/Number: Terde HuDDle, 564-4628 21. I hereby certify that the foreaojj3a is ~ue and correct to the best of my knowledge ~,/,// ' Signed Thomas UcCarty~ ,~'~'~-------~"--'-~ Title CT Drilling Engineer Date ' I h ,.i~ '1 i !U~u~,~: ........ ~,:j~,~,, ~a ~,..,. ,,,,,,,~ ................... ~--,-.,..~ ................................ I ~ :' ............................................................................. Permit Number APl Number ,,,/ Approval Date See cover letter ~'"' / 5J'~ 50- 029-21988-02 for other requirements Conditions of Approval: Samples Required [] Yes [] No Mud Log Required [] Yes [] No ' Hydrogen Sulfide Measures J~ Yes [] No Directional Survey Required [~ Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K :~J~.5K psi for CTU ~INAL SIGNED BY by order of Approved By D Taylor Seamount Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate BPX 5-25b Sidetrack Summary of Operations: 5-25a is currently shut in due to high GOR. The 5-25b sidetrack will access reserves located in the lowermost mouthbar sands in lower Zone la. This sidetrack will be conducted in two phases· Phase 1: Set IBP, Lay in cement, Mill window off of cement plug. Planned for Sept 23, 2000. · Service coil will Set anchor spaced for =10,000' KOP, and set whipstock indexed off of the anchor · Service coil will squeeze cement past the whipstock to abandon the existing slotted liner with approx. 46 bbls cement (OH volume in slotted section + 3 Y2" solid volume to 10000' + 25% excess). · Service coil will mill the window off whipstock with the KOP at approx. 10000'md (8973'tvdss) · Service coil will set a back pressure valve and remove the tree down to the master valve prior to the rig moving on location. Phase 2: Drill and Complete sidetrack: Planned for Sept 28, 2000· Drilling coil will be used to drill a 3" open hole and complete the directional hole as per attached plan. The sidetrack will be completed with a cemented 2 3/8" liner that will overlap the existing 3 1/2" solid portion of the liner. The top of 2 3/8" liner is planned at approx. 9600' MD (8752'tvdss). Approx. 9 bbls cement will be used for this liner cement job. The cement top is planned to be at the top of the 2 3/8" liner. Mud Program: Phase 1' Seawater Phase 2: Seawater and FIo-Pro (8.5 - 8.7 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject· · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 3/8", 4.39#, L-80, FL4S cemented liner will be run from TD to approx. 9600' MD (8752'tvdss). Top of liner cement will be brought to the top of the 2 3/8" liner· Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2000 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. · Max hole angle of 5-25b well plan is 97deg. · Depth at TD is 8965'tvdss Logging · An MWD Gamma Ray log will be run over all of the open hole section. · A memory cnl log will be run in the cemented 2 3/8" liner RECEIVED SEP 1 9 ?.000 · O '. Alaska & Gas C0mmiss 0 Hazards No lost circulation is expected. Max. recorded H2S on DS 5 in 2000 is 5 ppm. The last recorded H2S reading on 5-25 was 4ppm in 1994. Reservoir Pressure Res. pressure is estimated to be 3310 psi at 8800ss. Maximum surface pressure with gas (0.12 psi/ft) to surface is 2254 psi. 5-25b Potential Drilling Hazards Post on Rig 1. H2S is not expected on this well. Max. recorded H2S on DS 5 in 2000 is 5 ppm. The last recorded H2S reading on 5-25 was 4ppm in 1994. 2. BHP is estimated to be 3310psi @ 8800' tvdss. 3. Maximum anticipated well head pressure w/full column of gas 2254psi. 4. One small (15') fault is anticipated in the planned polygon. No losses are expected at his fault but it should be avoided when perforating. Seismic quality in this area is considered excellent. 5. If the wellbore penetrates the 14N shale a plugback may be necessary. DS OPOSED CT HORIZONT A DETRACK @ 98' @ @ @ @ ,/ @ & '" '" N " ::£ 'ii) '" w :t 'ii) '" :;;: " 'S 15 ?a a 0::- w 00 f- ¡;:¡~ Z W -;;:; - (j) '" ~ <:: Õ1 ,£ ::J õ I !}j ø ~ ~ :¡: co '" >- :> .0 ë:J <J) (a CL <J) ò:: 0 0 " co [u!IIIOOS] (+)4¡JoNI(-)4¡nOS ~ 1; " Q '" g ~ Ij ~,,~ ~, ~ Q t;;:;¡" ~ æ E ~ ~~ ~g ~~ ~~ ~ ~ ~~ ~g ~â ~~ ~ ~ £æ ~~ ~æ ug 13:1" .sa l~ i'~ 0: £ [U!!Ilom:] 4lda{ 1"~!¡Ja^ anJl · Proposal Calculations HUGHES Coordinates provided in: TRUE and GRID relative to Wellhead INTEQ and ALASKA STATE PLANE Company: BP Exploration Aiaska~ Inc. Vertical Sect. Plane: 260.000 TRUE Job No: Field: Prudhoe Bay Unit Mag. Declination: 27.030 AFE No: Well: 05-25B Plan g2 Grid Correction: 1.500 API No: 50-029-21988-02 Rig: CDR 1 Total Correction: 25.530 Coordinate System: TRUE Surface Location Dip: 80.780 Drilled from: 05-25A }~: 697245.9 RKB Height: 72.130 Y: 5948888.7 Meas. Incl. TRUE Subsea Coords. - True Coords. - ASP Dogleg Vertical Tool Face Build Turn Depth Angle Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments (ft) (deg) (deg) (ft) (ft) (ft) Lat. (Y) Dep. (X) (°/100ft) (ft) (cia0) (°/100ft) (°/100ft) 9937.83 75.54 203.40 8964.18 -980.87 -2720.20 5947836.93 694552.43 0.00 2849.20 0.00 0.00 0.00 Tie-in Point from 05-25A 9950.00 77.59 203.24 8967.01 -991.74 -2724.89 5947825.94 694548.04 16.90 2855.70 -4.46 16.85 - 1.35 9957.24 78.81 203.14 8968.49 -998.25 -2727.68 5947819.36 694545.41 16.89 2859.58 -4.43 16.84 - 1.33 9968.29 81.03 202.85 8970.42 -1008.27 -2731.93 5947809.23 694541.43 20.26 2865.51 -7.35 20.09 -2.62 9980.00 84.16 202.75 8971.93 - 1018.97 -2736.43 5947798.42 694537.21 26.78 2871.80 - 1.85 26.77 -0.87 9984.47 85.36 202.71 8972.341 -1023.08 -2738.15 5947794.27 694535.60 26.76 2874.21 -1.83 26.75 -0.86 10000.00 88.77 202.31 8973.13 -1037.40 -2744.09 5947779.80 694530.03 22.11' 2882.54 -6.69 21.96 -2.58 Kick-off Point 10025.00 90.45 207.04: 8973.30 - 1060.11 -2754.52 5947756.82 694520.20 20.08 2896.76 70.47 6.72 18.92 10050.00 92.13 211.77 8972.74 -1081.88 -2766.79 5947734.74 694508.51 20.08 2912.62 70.44 6.71 18.93~ 10075.00 93.79 216.52 8971.45 - 1102.53 -2780.80 5947713.73 694495.05 20.08 2930.01 70.54 6.65 18.97 10100.00 95.43 221.28 8969.44 -1121.92 -2796.44 5947693.94 694479.92 20.08 2948.78 70.79 6.55 19.04 10120.00 96.71 225.10 8967.32 -1136.42 -2810.04 5947679.09 694466.70 20.06 2964.69 71.16 6.41 19.11 1 10125.00 96.45 226.09 8966.75 -1139.90 -2813.59 5947675.52 694463.25 20.28 2968.78 104.60 -5.13 19.75 10150.00 95.14 231.01 8964.22 -1156.35 -2832.23 5947658.58 694445.05 20.28 2990.00 104.71 -5.24 19.69 10175.00 93.80 235.91 8962.27 -1171.19 -2852.24 5947643.23 694425.43 20.28 3012.29 105.21 -5.39 19.61 10200.00 92.42 240.80 8960.91 -1184.28 -2873.49 5947629.59 694404.53 20.28 3035.48 105.59 -5.50 19.55 10225.00 91.03 245.68 8960.16 -1195.53 -2895.80 5947617.76 694382.53 20.28 3059.40 105.86 -5.57 19.51 10243.19 90.01 249.23 8960.00 -1202.50 -2912.59 5947610.35 694365.93' 20.31 3077.15 105.98 -5.60 19.53 2 10250.00 90.01 249.92 8960.00 -1204.88 -2918.97 5947607.80 694359.61 10.08 3083.85 90.02 0.00 10.08 10300.00 90.01 254.96 8959.99 - 1219.96 -2966.63 5947591.48 694312.37 10.08 3133.40 90.02 0.00 10.08 10350.00 90.01 260.00 8959.98 - 1230.80 -3015.42 5947579.37 694263.88 10.08 3183.34 90.02 0.00 10.08 10400.00 90.00 265.04 8959.98 -1237.31 -3064.98 5947571.56 694214.51 10.08 3233.27 90.02 0.00 10.08 10450.00 90.00 270.08 8959.98 -1239.44 -3114.92 5947568.12 694164.65 10.08 3282.82 90.02 0.00 10.08 10500.00 90.00 275.12 8959.98 - 1237.18 -3164.85 5947569.08 694114.68 10.08 3331.60 90.02 0.00 10.08 10550.00 90.00 280.16 8959.98 -1230.53 -3214.39 5947574.42 694064.98 10.08 3379.24 90.02 0.00 10.08 10600.00 90.00 285.20, 8959.98 -1219.56 -3263.16 5947584.11 694015.95 10.08 3425.36 90.02 0.00 10.08 10650.00 89.99 290.241 8959.98 -1204.35 -3310.77 5947598.06 693967.96 10.08 3469.60 90.02 0.00 10.08 10704.80 89.99 295.74 8960.00 -1183.03 -3361.21 5947618.06 693916.98 10.04 3515.58 90.05 -0.01 10.04 3 10750.00 89.99 291.09 8960.01 -1165.07 -3402.68 5947634.92 693875.06 10.28 3553.29 -89.98 0.00 -10.281 10800.00 89.99 285.95 8960.01 -1149.19 -3450.07 5947649.55 693827.27 10.28 3597.21 -89.98 0.00 -10.281 Meas. Incl. TRUE Subsea Coords. - True Coords. - ASP Dogleg Vertical Tool Face Build Turn Depth Angle Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Severity Section Comments (ft) (de~) (del~) (ft) (ft) (ft) Lat. (Y) Dep. (X) (°/lOOft) (ft) (dog) (°/100ft) (o/100ft) 10850.00 90.00 280.81 8960.02 -1137.62 -3498.70 5947659.84 693778.36 10.28 3643.09 -89.98 0.00 -10.28 10900.00 90.00 275.67 8960.02 -1130.46 -3548.16 5947665.71 693728.72 10.28 3690.56 -89.98 0.00 -10.28 10950.00 90.00 270.53: 8960.02' - 1127.75 -3598.07 5947667.11 693678.76 10.28' 3739.24 -89.98 0.00 - 10.28 11000.00 90.00 265.39 8960.02 - 1129.53 -3648.02 5947664.03 693628.87 10.28 3788.74 -89.98 0.00 - 10.28 11050.00: 90.00 260.25 8960.02 -1135.77 -3697.62 5947656.48 693579.47 10.28 3838.67 -89.98 0.00 -10.28 11100.00 90.01 255.11 8960.02 -1146.43 -3746.45 5947644.55 693530.93 10.28 3888.61 -89.98 0.00: -10.28 11150.00 90.01 249.97 8960.01 -1161.43 -3794.13 5947628.31 693483.66 10.28 3938.17 -89.98 0.00 -10.28 11200.00 90.01 244.83 8960.00 - 1180.63 -3840.28 5947607.90 693438.04 10.28 3986.95 -89.98 0.00 - 10.28 11210.81 90.01 243.71 8960.00 -1185.37 -3850.00 5947602.91 693428.44: 10.39 3997.35 -89.96 0.01 -10.39 4 11250.00 89.90 247.67 8960.03 -1201.50 -3885.71 5947585.85 693393.17 10.11 4035.31 91.62 -0.29 10.11 11300.00 89.76 252.72 8960.18 -1218.43 -3932.74 5947567.69' 693346.61 10.11 4084.57 91.62 -0.28 10.11 11350.00 89.62 257.78 8960.46 -1231.16 -3981.07 5947553.71 693298.62 10.11 4134.38 91.60 -0.28 10.1 I 11400.00 89.48 262.83 8960.85 -1239.58 -4030.34 5947544.00 693249.59 10.11 4184.36 91.57 -0.27 10.11 11450.00 89.35 267.88, 8961.37 -1243.62 -4080.16 5947538.65 693199.90 10.11 4234.12 91.53 -0.27 10.11 11500.00 89.221 272.94 8961.99 - 1243.27 -4130.14 5947537.70 693149.94 10.11 4283.28 91.48 -0.26 10.11 11550.00 89.10 277.99 8962.73 -1238.51 -4179.89 5947541.15 693100.08 10.11 4331.45 91.42 -0.24 10.11, 11600.00 88.98 283.05 8963.57 -1229.38 -4229.02 5947548.99 693050.72 10.11 4378.26 91.34 -0.23 10.11 11650.00 88.87 288.10 8964.51 -1215.97 -4277.16 5947561.14 693002.25 10.11 4423.33 91.26 -0.21 10.11 11674.21 88.82 290.54 8965.00 -1208.00 -4300.00 5947568.50 692979.21 10.08 '~. ~. ~.'~..4491.29 -0.22 10.08 TD CDR1 Drilling Wellhead I~-'tail Rig Floor (~)~ I ~ CT Injector Head I Otis Q.C. thread half Traveling plate 21' 2" 4' 9" Dual I Hydrill "B" 5,000 psi Ram TvDe Dual Gate BOPE .. 7" lubricator Traveling Plate 7" O.D. Jacking Frame Top Stationary Plate ..-- Annular BOP ~"1 (Hydril),7-1/16" ID '1 "~'~ Annular BOP i (Hydril),7-1/16" ID Top 2" pipes Bottom blindlshearI Kill Line I-~ ~ Top 2" slips I *-~~ Bottom 2 3/8" pipes Manual Master Valve -- Tubing Hanger 9-5/8" Annulus 13-3/8" Annulus STATE OF ALASKA ALAS " 'IL AND GAS CONSERVATION COM '~SION K(A~PLICATION FOR SUNDRY APPROVe,_ 1. Type of Request: [] Abandon [] Alter Casing [] Change Approved Program [] Suspend [] Repair Well [] Operation Shutdown 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface 2558' SNL, 173' EWL, SEC. 32, T11 N, R15E, UM At top of productive interval 3230' SNL, 2395' WEL, SEC. 31, T11 N, R15E, UM At effective depth 170' SNL, 3047' WEL, SEC. 06, T10N, R15E, UM At total depth 170' SNL, 3047' WEL, SEC. 06, T10N, R15E, UM [] Plugging [] Time Extension [] Pull Tubing [] Variance [] Re-Enter Suspended Well [] Stimulate [] Perforate [] Other Plug Back for Sidetrack Type of well: Ilil Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 72.13' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 05-25A 9. Permit Number 196-126 10. APl Number 50- 029-21988-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11916 feet true vertical 9055 feet Effective depth: measured 11916 feet true vertical 9055 feet Casing " Length Size Structural Conductor 110' 20" Surface 3457' 10-3/4" Intermediate 9187' 7-5/8" Production Liner 398' 5-1/2" Liner 3098' 3-1/2" Plugs (measured) Junk (measured) Cemented. MD 'I'VD 2150# Poleset 1000 sx CS III, 350 sx 'G', 157 sx CS 410 sx Class 'G' 155 sx Class 'G' 135 sx Class 'G' & Uncemented 110' 110' 3490' 3489' 9220' 8483' 8874'-9272' 8188'8527' 8818'-11916' 8140'-9055' Perforation depth: measured SIoEed Linec 10396'-11914' RECEIVED true vertical Slotted Liner: 9045' - 9055' SEP 1 9 2000 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 t° 8820' Alaska 0~t & Gas Co~s.,(~Jmmissio~ Anch0mge Packers and SSSV (type and measured depth) 4-1/2" camco BaI-O SSSV Nipple at 2189'; 7-5/8" x 4-1/2" Baker'S' packer at 3893' and 8765' 13. Attachments ~a' Description Summary of Proposal 14. Estimated date for commencing operation September 23, 2000 16. If proposal was verbally approved 115. I Name of approver Date Approved' Contact Engineer Name/Number: Thomas McCarty, 564-5697 17. I hereby cert~foregoing is true and correct to the best of my knowledge Signed _ ~"~ ..-. ~ ¢~""-."'~"~~ ' Title CT Drilling Engineer I nomas MCl. Jarty Mechanical Integrity Test ~.pl3roved by order of the Commission Form 10-403 Rev. 06/15/88 [] Detailed Operations Program Status of well classifications as: [] Oil [] Gas [] Suspended Service [] BOP Sketch Prepared By Name/Number: Ter~e Hubble, 564-4628 Plug integrity ~ BOP Test ~ Location clearance ~ . Subsequent form required 10- Date Commissioner Submit In Triplicate H 1 7: : 72 DATE INVOICE I CREDIT MEMO 08~00, HANDLII ~KO82200D ~G INST: .TERR DESCRIPTION GROSS E HUBBLE X4& 28 100.00 THE AITACHED CHECK IS IN PAYMENT FOR ITEM8 DESCRIBED ABOVE. 'DATE 8/2 7oo ] VEN~R ~1.~ DISCOUNT CHECK NO. o I 100.00 · ' -" '"" 4"~'~' ':" ' ' ~ .,.~.. ... .:. -' -' '~ . .. . .. ,-.~ .. . . .... . . .- . ..' . . ..: - . j. . . ...: .... .. , ~' .- - ':::.::.-;- ..:¢'._ .'..:-;-;:.-~:2 .' -'-':-:[: :i - -':::~::~:.-.. ' '· ... ' . .>-':- : ;. ::: '.:..:~':::;<:".. '.::': ::~. .:':;.~;-2"'.-',' -' ; i-'.. '-'~':". -- .'- :' ' '.: "'i..:.'. . ,. ],?:1,3.? ~3,. ,:OL ], i?O3RqS,: OOBr, r, ],q," WELL PERMIT CHECKLIST COMPANY .L~P WELL NAME O'~'-~ ~ PROGRAM: exp dev FIELD& POOL ("~"/4.~ / -.~"4~ INIT CI.~ASS ~~,'/' ~'~)//--- GEOLAREA ~(~::) ADMINISTRATION APPR DATE 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and'number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs.. .......... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long. string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C. T. B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... v/ redrll ~" serv wellbore seg ann. disposal para req UNITe c"'~//~~~ ON/OFF SHORE Y N N N N Y N zL~C>- ~ %% ~=,c_(z_~.,,~ ~, I ~ % DATE OLOGY DATE 22. 23. 24. 25. 26. 27. Adequate'wellbore separation proposed ............. If diverter required, does it meet regulations .......... Drilling fluid program schematic & equip list adequate ..... BOPEs, do theY meet 'regulation ................ BOPE press.rating appropriate; test to .~c~C) psig. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. permit can .be issued wlo hydrogen sulfide measures ..... ,Y, (~ .. 31. Data presented on potential overpressure zones ....... ~ ~ 32. Seismic analysis of shallow gas zones .......... ; '.~/q/t' Y"-" N 33. Seabed condition survey (if off-shore) ....... '...~.. Y N 34. Contact name/phone for weekly progress reports [ex,oratory only] Y N YN Y N Y N Y N ENGINEE~NG: UlClAnnular COMMISSION: ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... ~,PPR DATE (B) will not contaminate freshwater; or cause drilling waste... to surface; (C) will not impair mechanical integrity of the well used for disposal; · (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. · Comments/Instructions: J§ c:~soffice\wordian~iana~checklist (rev. 02117100) Well Histocy File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process 'but is part of the history file. , . , To improve the readability of the Well History file and to simplify' finding information, information, of this, nature is accumulated at the end of the file under APPEN. DIX~ No'special'effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 01/06/17 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 01/06/17 86693 01 1.75" NaviGamma - Gamma Ray *** LIS COMMENT RECORD *** Remark File Version 1.000 Extract File: glen.las ~Version Information VERS. 1.20: WRAP. NO: ~Well Information Block CWLS log ASCII Standard -VERSION 1.20 One line per frame #MNEM.UNIT Data Type Information STRT.FT 9985.0000: Starting Depth STOP.FT 11582.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Alaska WELL. WELL: 05-25B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 2558' SNL, 173' EWL CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 1.75" NaviGamma - GaK~a Ray DATE. LOG DATE: 28-Oct-00 API. API NYUMBER: 500292198802 ~Parameter Information Block %MNEM.UNIT Value Description SECT. 32 : Section TOWN.N lin : Township RANG. 15E : Range PDAT. MSL : Permanent Datum EPD .F 0 : Elevation Of Perm. Datum LMF . 9992 RKB : Log Measured from FAPD.F 72.13 : Feet Above Perm. Datum DMF . KB : Drilling Measured From EKB .F 72.13 : Elevation of Kelly Bushing EDF .F N/A : Elevation of Derrick Floor EGL .F N/A : Elevation of Ground Level CASE.F N/A : Casing Depth OSl . DIRECTIONAL : Other Services Line 1 ~Remarks (1) Ail depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) Ail Gamma Ray data (GRAX) presented is realtime data. (4) Well 05-25B was kicked off @ 9985' MD (8973' SSTVD) on Run 1. (5) Well 05-25B was drilled to TD @ 11582' MD (8970' SSTVD) on Run 7. Final Tie-in adjusts TD to 11582' MD (8973' SSTVD). (6) The interval from 11560' MD (8972' SSTVD) to 11582' MD (8973' SSTVD) was not logged due to sensor to bit offset. (7) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) supplied by BPX (SWS, 29 Oct 2000). (8) A Magnetic Declination correction of 27.03 degrees has been applied to the Directional Surveys. MNEMONICS: GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour SSTVD -> Subsea True Vertical Depth, feet SENSOR OFFSETS: RUN GAMMA DIRECTIONAL 1 18.21 ft. 23.19 ft. 2 18.33 ft. 23.31 ft. 3 18.20 ft. 23.18 ft. 4 18.65 ft. 23.63 ft. 5 18.68 ft. 23.66 ft. 6 18.20 ft. 23.18 ft. 7 18.20 ft. 23.18 ft. CURVE SHIFT DATA BASELINE, MEASURED, 10062.3, 10065.2, 10065.9, 10068.8, 10070.4, 10073.6, 10121.9, 10126.3, 10172.7, 10177.9, 10193.8, 10195.2, 10231.5, 10234.4, 10239.8, 10242.5, 10301.4, 10310.3, 10338.6, 10349.8, 10341.7, 10352.9, 10474.8, 10504.6, 10512.7, 10547.5, 10518.6, 10555.4, 10530.4, 10571.7, 10540.7, 10584.7, 10574.6, 10622.5, 10582.9, 10632.5, 10722.3, 10748.6, 10747.5, 10772.5, 10759.4, 10784.4, 10773.8, 10798.8, 10809.6, 10821.5, 10852.3, 10852.1, 10855.7, 10856.3, 10875.0, 10876.9, 10883.4, 10887.1, 10897.5, 10900.4, 11069.4, 11072.7, 11161.7, 11172.5, 11216.1, 11222.7, 11240.9, 11250.0, 11302.5, 11315.0, 11320.2, 11334.6, 11405.9, 11398.6, 11429.0, 11422.3, 11437.9, 11431.1, 11446.9, 11449.0, 11479.6, 11475.7, 11507.3, 11506.5, 11516.7, 11516.7, 11522.7, 11521.5, EOZ END ! BASE CURVE: GROH, DISPLACEMENT 2.91602 2.91699 3.125 4.375 5.20898 1.45801 2.91699 2.70898 8.95801 11.249 11.249 29.791 34.792 36.875 41.249 43.958 47.917 49.583 26.25 25 25 25 11.875 -0.208984 0.625 1.875 3.75 2.91699 3.33301 10.833 6.66602 9.16699 12.5 14.375 -7.29102 -6.66602 -6.875 2.08301 -3.95801 -0.833984 0 -1.25 OFFSET CURVE: GRAX Tape Subfile: 1 119 records... Minimum record length: 8 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Alaska WN 05-25B FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented has been edited from the field raw data. 2, The data has been depth shifted to match the PDC supplied by BPX 3. The PDC used is a Schlumberger Gamma Ray dated 29-Oct-00. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP 1 GR GRAXl2 0.0 2 ROP ROPS12 0.0 * FORMAT RECORD (TYPE% 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 API 2 ROP MWD 68 1 F/HR Size 4 4 Total Data Records: 39 Length 4 4 8 Tape File Start Depth = 9985.000000 Tape File End Depth = 11582.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 48 records... Minimum record length: Maximum record length: 42 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Alaska WN 05-25B FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is the unedited field raw data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP 1 GRAX GRAX 0.0 2 ROPS ROPS 0.0 * FORMAT RECORD (TYPE% 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: IF ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GRAX MWD 68 1 API ROPS MWD 68 1 F/HR Total Data Records: 39 Size Length 4 4 4 4 8 Tape File Start Depth = 9985.000000 Tape File End Depth = 11582.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 Minimum record length: Maximum record length: 48 records... 42 bytes 4124 bytes **** TAPE TRAILER **** MWD 01/06/17 86693 01 **** REEL TRAILER **** MWD 01/06/17 BHI 01 Tape Subfile: 4 Minimum record length: Maximum record length: 2. records... 132 bytes 132 bytes .. Tape Subfile 1 is Tape Subfile 2 is DEPTH 9985.0000 9985.5000 10000.0000 10100.0000 10200.0000 10300.0000 10400.0000 10500.0000 10600.0000 10700.0000 10800.0000 10900.0000 11000.0000 11100.0000 11200.0000 11300.0000 11400.0000 11500.0000 11582.0000 type: LIS type: LIS GR ROP -999.2500 -999.2500 -999.2500 -999.2500 26.6959 -999.2500 56.5172 125.2239 41.7607 100.2800 23.2454 101.3465 36.3418 85.2234 38.0791 112.1789 21.4258 36.0211 31.4913 14.2439 80.7217 71.9575 45.3096 83.0770 45.2265 44,0899 23.3320 160.8346 24.1032 136.3259 91.2008 44.8418 54.9313 45.6438 29.2961 58.7416 -999.2500 -999.2500 Tape File Start Depth = 9985.000000 Tape File End Depth = 11582.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9985.0000 -999.2500 -999.2500 9985.5000 -999.2500 -999.2500 10000.0000 27.5380 -999.2500 10100.0000 36.6180 112.5790 10200.0000 36.9870 101.7320 10300.0000 41.5500 124,2230 10400.0000 36.9630 117.7900 10500.0000 24.3180 82.5600 10600.0000 37.3100 46.6190 10700.0000 30,7080 42.3080 10800.0000 137,2900 15.7590 10900,0000 45.8360 60.5920 11000.0000 40.5440 115.2000 11100.0000 23.7680 142.8630 11200.0000 29.1090 29.7010 11300.0000 65.3330 73.1190 11400.0000 42.6650 14.3810 11500.0000 28.9630 16.7320 11582.0000 -999.2500 -999.2500 Tape File Start Depth = 9985.000000 Tape File End Depth = 11582.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS