Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout200-125 Ima, !ect Well History File CoverJi~3ge
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
~_ (~ (~- J_ c:~ ~- Well History File Identifier
RESCAN DIGITAL DATA
OVERSIZED (Scannable)
[]
[]
[]
[] Other:
NOTES:
Color items:
Grayscale items:
Poor Quality Originals:
[] Diskettes, No.
[] Other, No/Type
BY:
BEVERLY ROBIN VINCENT SHERY~INDY
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERY~INDY
Scanning Preparation
BY:
BEVERLY ROBIN VINCENT SHERYL~INDY
[] Maps:
· [] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
III IIIIIIIIIII II III
Production Scanning
Stage 1 PAGE COUNT FROM SCANNED FILE: ?/
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: /TZ~ ,.,YES NO
BY: BEVER~BIN.._.,...~.~INCENT SHERYL MARIA WINDY DATE: ,~
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPA~..~'Es ~ FOUND: . ~S NO
BY; BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DAT. ~.
RESCANNEDBY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
General Notes or Comments about this file:
DATE: Isl
Quality Checked
12110/02Rev3NOTScanned.wpd
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIS~ON MAR ~ 6 201D
WELL COMPLETION OR RECOMPLETION REPORT A~'osCq~,
1 a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended
2oAAC2s.~os zoAACZS.»o
^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1 b. Well Class: g~{'~
^ Development ^ Exploratory
®Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.:
,~,-_.
3/4/2010 12. Permit to Drill Number:
200-125 309-370
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded:
08/27/2000 13. API Number:
50-029-22971-00-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached:
09/04/2000 14. Well Name and Number:
° MPF-82
1991
FSL, 3011
FEL, SEC. 06, T13N, R10E, UM
Top of Productive Horizon:
807' FNL, 2375' FEL, SEC. 12, T13N, R09E, UM g. KB (ft above MSL): 42.15'
GL (ft above MSL): 11.3'
15. Field /Pool s
()~
Milne Point Unit / Kuparuk River
Total Depth:
864' FNL, 2464' FEL, SEC. 12, T13N, R09E, UM 9. Plug Back Depth (MD+ND):
9123' 7037' Oil Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 541552 y_ 6035442 Zone- ASP4 10. Total Depth (MD+ND):
9440' 7327' 16. Property Designation:
ADL 025509 & 388235
TPI: x- 537044 y- 6032619 Zone- ASP4
Total Depth: x- 536956 Y- 6032561 Zone- ASP4 11. SSSV Depth (MD+ND):
N/A 17. Land Use Permit:
18. Directional Survey: ^ Yes ®No
Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore:
N/A ft MSL 20. Thickness of Permafrost (ND):
1800' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
DIR, GR, ESS, G ro, RES, PWD, CCL, USIT 22. Re-Drill/Lateral Top Window MD/TVD:
N/A
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT'
CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE " CEMENTING RECORD'- PULLED
.5# K- 5 1 9' 1 O x Ar i A rox.
1 i
7" 6# L-8o / N-80 2 ' 42 ' 2 ' 7 14' -1 1 x Cla '
24. Open to production or injection? ^ Yes ®No 25. Tuewc RI=_coRD
If Yes, Ilst each InteN81 Open
(MD+ND of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER .SET MD / ND
3-1/2", 9.2#, L-80 9072' 9034' / 6957'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
"~' d~ ~ Y~~ k a~~ ~ ~' is ~' s.F ~ ~.~ ~ {~ DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED
9157' P&A w/ 20 Bbls Cement
9123' Set Whipstock
27. PRODUCTION TEST
Date First Production:
Not on Injection Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test: Hours Tested: Production For
Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: Calculated
24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
28. CORE DATA Conventi onal Core(s) Acqu ired? ^ Yes ® No Sidewall Core(s) Acquired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
None
RBDMS MAR ~ ~ ~0'~
Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only
Y~zZ~a
r/~~
r
29. GEOLOGIC MARKERS (List all formati ons and ma ncountered): 30. NATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
Permafrost Base results. Attach separate sheets to this form, if needed, and submit
detailed test information per 20 AAC 25.071.
Kuparuk C / B 9119' 7033' None
Kuparuk A 9173' 7082'
Kuparuk A3 9182' 7090'
Kuparuk A2 9201' 7107'
Kuparuk Al 9231' 7134'
Formation at Total Depth (Name):
31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~ '
Signed: Terrie Hubble Title: Drilling Technologist Date:
MPF-82 200-7 25 309-370 Prepared By NameMumber• Terrie Hubble, 564-4628
Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each addltional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.07E
Form 10-407 Revised 12!2009 Submit Original Only
MPF-82, Well History (Pre Rig Sidetrack)
Date Summary
1/13/2010 MIRU CTU. MU BTT LH Milling BHA w/ new 2.80" Parabolic Mill and RIH. Tagged X-N C«~ 9061' ctmd.
Milled through XN, dry drifted clean and POOH. Mill No-Go at 2.76". MU and RIH with PDS memory
GR/CCL. Flag pipe 50' above PBTD for depth correction. Log from 9334' to 8700' ctmd. POOH with
logging tools.
1/14/2010 Continue POOH with PDS logging tools. Download and confirm good data. MU and RIH with 2.5" BJN
cementing BHA. Correct depth at flag and tag bottom, PU 10' and flag. Batch Mix 20 bbls 17# KO Plug
CMT lay in from flag. Well took 3.3 of 20 bbls while laying in, putting TOC at 8,336'. 5 attempts to build
squeeze pressure failed at 240 psi each time, but we were able to achieve 1:1 returns at a lower WHP.
Called APE after 3rd attempt and he wanted to try a couple more times and, if we couldn't build at least
500 psi squeeze pressure, he wanted us to BH the CMT top down to -8972' then POOH pumping pipe
displacement and freeze protect well. 2 more attempts to build squeeze pressure failed at 240 psi,
squeezed away 5.5 bbls total leaving TOC at -8968'. __Well freeze protected from 2300' with 60/40 meth.
RDMO. Job Complete.
1/24/2010 WELL S/I ON ARRIVAL. CURRENTLY IN HOLE W/DUMMY WHIPSTOCK.
1/25/2010 RAN 3-1/2" GR (steel pin), 20' x 2.70" DMY WHIPSTOCK. SD Q 8085' SLM. SLIGHTLY STICKY,
POOH. RAN 2.22" CENT, 3' x 1-1/2" STEM, 2.56" CENT, 1-1/2" SAMPLE BAILER. SD C~ 8148' SLM,
WORKED DOWN TO 8164' SLM. RECOVERED DIME SIZED PIECE OF CONCRETE. RAN 2.15"
CENT, 3' x 1-1/2" STEM, 2.22" CENT, 1-1/2" SAMPLE BAILER. SD C~3 8168' SLM, WORKED DOWN TO
8179' SLM. RECOVERED FULL SAMPLE BAILER FULL OF CEMENT. TOP OF CEMENT C~1 8179'.
WELL LEFT S/I, TURN OVER TO DSO. JOB COMPLETE.
1/25/2010 Pumped 3 bbls down water injection line. Line not frozen. Bled to zero from grove valve to S-riser.
2/5/2010 MPU Well ST Set TWC then PT tree to 4750 PSI with diesel for 10 min to verify well head integrity.
NOTE: PULLED TWC
2/13/2010 The Well Support Techs rigged up and set a back pressure valve, then removed the wellhouse, flowlines
and foundation. NOTE: BPV was left IN and well is ready for the RWO.
Page 1 of 1
BP EXPLORATION Page 1
Operations Summary Report
Legal Well Name: MPF-82
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: REENTER+COMPLETE Start: 2/27/2010 End: 3/30/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/30/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
!, 2/27/2010 03:00 - 04:30 1.50 MOB P PRE
04:30 - 06:00 1.50 RIGU P PRE
06:00 - 15:00 9.00 RIGU N WAIT PRE
15:00 - 16:00 1.00 MOB P PRE
16:00 - 16:15 0.25 MOB P PRE
16:15 -18:00 1.75 MOB P PRE
18:00 - 20:00 2.00 RIGU P PRE
20:00 - 00:00 4.00 BOPSU P PRE
2/28/2010 00:00 - 01:30 1.50 BOPSU P PRE
01:30 - 03:30 2.00 BOPSUF~ P PRE
03:30 - 18:30 15.00 BOPSU P PRE
18:30 - 20:30 I 2.001 RIGU I P I I PRE
ROAD RIG FROM MPL-36L1.
PARK RIG IN FRONT OF WELL ROW. PREPARE CELLAR.
WAIT ON WEATHER. -42F MPU, -44 BOC, -46
DEADHORSE AIRPORT.
HAND RAILS ON WELLHOUSES ON BOTH SIDES HAVE
NOT BEEN REMOVED DUE TO WINDS, SNOW AND COLD
WEATHER.
POSITION MPD EQUIPMENT IN CELLAR.
PREPARE TO PULL HAND RAILS. CRANE ON LOCATION
TEMP AT -35F. PICK HAND RAILS WITH CRANE.
LOCATION READY TO BACK IN RIG.
SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND
MITIGATION FOR BACKING RIG OVER WELL.
BACK RIG OVER WELL, CENTER RIG OVER TREE AND
SET DOWN.
ACCEPT RIG AT 1800 HRS, 02/27/2010.
GENERAL RIG UIP. SEAL UP CELLAR. HEAT CELLAR.
POSITION SAT CAMP, CUTTINGS TANK AND TIGER TANK.
N/U BOPE AND MPp LOOP.
CONTINUED ON DIMS REPORT 02/28/10
CONTINUED FROM DIMS REPORT 02/27/10.
CONTINUE NU BOPE AND MPD LOOP.
VERY COLD, -41 F.
NOT ABLE TO MOVE SIGN-IN SHACK TO F PAD DUE TO
COLD TEMP AND REQUIRED CRANE TO LIFT HEAVY
SHACK.
SHELL TEST BOPE.
BEGIN BOPE PRESSURE /FUNCTION TEST.,AOGCC
WITNESS WAIVED BY JEFF JONES. ~
SEND TEST REPORT TO AOGCC. ~~'
VERY COLDER, -44F at 0700.
2" COMBI RAMS FAILED TEST. REPLACE AND RETEST.
CHOKE LINE FROZE UP, THAW LINE. -40F.
2" RAMS PASS. BOP TEST COMPLETE. RD TEST
EQUIPMENT. SLOWDOWN STACK.
AT APPROXIMATELY 18:40 DISCOVERED GLYCOL ON
PAD UNDERNEATH BOOSTER TIRES. AFFECTED AREA IS
-56" X 42". ESTIMATED VOLUME IS 2 QUARTS. TRACE
LEAK PATH -BELIEVE SOURCE OF GLYCOL TO BE
"LUBESTER" (BULK GLYCOL TANK IN MOTOR ROOM). A
SMALL POOL OF GLYCOL FOUND IN GRAVITATIONAL
LOW SPOT IN SEAL WELDED SECONDARY
CONTAINMENT BENEATH TANK. BELIEVE GLYCOL
LEAKED THROUGH CRACK IN SEAL WELD, FOLLOWED
RIG SUBSTRUCTURE AND ULTIMATELY DRIPPED ONTO
PAD. PJSM W/ CREW REGARDING RELEASE -REVIEW
MSDS. CLEANED RESIDUAL GLYCOL FROM SECONDARY
CONTAINMENT AND ENSURED RELEASE HAD STOPPED.
NOTIFY MP SPILL REPORTING, SRT, PAD OPERATOR,
NORDIC MANAGEMENT, ADW HSE AND ADW CTD
SUPERINTENDENT.
PJSM. PU INJECTOR. INSTALL PACKOFF ASSEMBLY.
Printed: 3/19/2010 1:30:27 PM
BP EXPLORATION Page 2
Operations Summary Report
Legal Well Name: MPF-82
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: REENTER+COMPLETE Start: 2/27/2010 End: 3/30/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/30/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
2/28/2010 18:30 - 20:30 2.00 RIGU P PRE C/O CREWS. TL W/NEW CREW. PJSM. PULL COIL
ACROSS.
20:30 - 22:00 1.50 RIGU P PRE REMOVE CT GRAPPLE. DRESS AND BEHEAD CT AND PT.
REREAD BHI.
22:00 - 23:30 1.50 RIGU P PRE CIRC CT ON WELL W/METH AND KCL.
23:30 - 00:00 0.50 RIGU P PRE TEST REEL VALVE AND PACKOFF TO 250 PSI / 3500 PSI.
'~ GOOD.
CONTINUED ON DIMS REPORT 03/01/10
3/1/2010 00:00 - 01:00 1.00 RIGU P PRE CONTINUED FROM DIMS REPORT 02/28/10.
PJSM. UNSTAB, INSTALL CHECK VALVES AND PT TO
3500 PSI.
BREAK OFF AND STANDBACK INJECTOR.
GUAGE MILL FOR UPCOMING RUN: MILL IS 2.80" NOGG /
2.81" GO. MILL IS A PARABOLIC DIAMOND SPEED MILL
WITH BACKREAMERS AND NO SIDE CUTTERS.
01:00 - 02:15 1.25 RIGU N WAIT PRE WAIT ON BPV CREW. THEY ARE SHORTHANDED
TONGIHT.
FIND PHONE MESSAGE ON PUSHER TELEPHONE FROM
SRT. SRT (NEIL HERMAN (SP?) AT EXTENSION 3022)
GIVES US PERMISSION TO CLEAN AFFECTED AREA
FROM YESTERDAY'S GLYCOL RELEASE. HE SAYS HE
WILL CALL BACK IN THE MORNING. CLEAN AFFECTED
AREA. BAG AND TAG APPROPRIATELY.
02:15 - 02:40 0.42 RIGU P PRE BPV CREW ON LOCATION AT 0215. PJSM W/BPV CREW.
02:40 - 04:00 1.33 RIGU P PRE MU LUBRICATOR. PULL BPV. LAY DOWN LUBRICATOR.
04:00 - 04:40 0.67 WHIP P WEXIT PU INJECTOR. PU MOTOR AND MILL ASSEMBLY. MOTOR
IS STRAIGHT. MILL IS 2.80" PARABOLIC DIAMOND D331
MILL WITH BACKREAMERS, NO SIDE CUTTERS.
04:40 - 06:00 1.33 WHIP P WEXIT BEGIN RIH CIRCULATING 2% XS KCL DOWN CT AT 0.4
BPM AT 190 PSI THROUGH MOTOR W/ RETURNS TO TT.
IAP = 475 PSI. OAP = 16 PSI. BLEED IAP TO 250 PSI.
TAG CEMENT AT 8132'.
06:00 - 09:30 3.50 WHIP P WEXIT MILL CONTAMINATED CEMENT WITH USED GEOVIS, 1.6
BPM, 3000-3800 PSI, 20-50 FPH, MILLED TO 8240'
09:30 - 14:00 4.50 WHIP P WEXIT MILL CEMENT WITH USED GEOVIS, 1.6 BPM, 3000-3500
PSI, 1.5K WOB, 40 FPH,
MILLED TO 8450'
14:00 - 15:00 1.00 WHIP P WEXIT MILL CEMENT WITH USED GEOVIS, 1.5 BPM, 3000-3500
PSI, 2.5 K WOB, 40 FPH,
MILLED TO 8500'.
15:00 - 15:15 0.25 WHIP P WEXIT WIPER UP TO 8100'. CLEAN. RIH CLEAN.
15:15 - 18:15 3.00 WHIP P WEXIT MILL CEMENT WITH USED GEOVIS, 1.5 BPM, 3000-3500
PSI, 2.5 K WOB, 25 FPH,
MILLED TO 8580'.
18:15 - 20:00 1.75 WHIP P WEXIT MILL CEMENT WITH USED GEOVIS, 1.46 BPM AT 3200 -
3500 PSI, 2.5K WOB, 25 FPH.
MILLED TO 8633' CTMD.
20:00 - 21:00 1.00 WHIP P WEXIT MILL CEMENT WITH USED GEOVIS, 1.46 BPM AT 3200 -
3500 PSI, 2.5K WOB, 25 FPH BOP.
MILLED TO 8656' CTMD. STALLED AT THIS DEPTH. PU
CLEAN AT 25K LB.
2:00 - 22:00 1.00 WHIP P WEXIT WIPER TO 8100'. UP WEIGHTS CLEAN AT 25K LB.
Printed: 3/19/2010 1:30:27 PM
,~ ~ ,
BP EXPLORATION Page 3
Operations Summary Report
Legal Well Name: MPF-82
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: REENTER+COMPLETE Start: 2/27/2010 End: 3/30/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/30/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
3/1/2010 21:00 - 22:00 1.00 WHIP P WEXIT PUMPING DOWN CT AT 1.48 BPM AT 2720 PSI WHILE PUH
AT 35 FPM. RBIH TO RESUME MILLING. TRIP CLEAN IN
BOTH DIRECTIONS.
22:00 - 00:00 2.00 WHIP P WEXIT MILLED CEMENT TO 8725' AT 30 FPH, 3K WOB.
3/2/2010 00:00 - 05:00 5.00 WHIP P WEXIT MILL CEMENT WITH 2.80" MILL AND STRAIGHT MOTOR,
3300-3800 PSI, 3K WOB, 30 FPH.
MILLED TO 8855'.
05:00 - 05:30 0.50 WHIP P WEXIT WIPER TRIP TO 8100'. CLEAN BOTH DIRECTIONS.
05:30 - 11:00 5.50 WHIP P WEXIT MILL CEMENT WITH 2.80" MILL AND STRAIGHT MOTOR,
3300-3800 PSI, 3K WOB, 30 FPH.
MILLED TO 9012'.
11:00 - 19:00 8.00 WHIP P WEXIT MILL CEMENT WITH 2.80" MILL AND STRAIGHT MOTOR,
3300-3800 PSI, 3K WOB, 30 FPH. LOG GR~~r1P1 FROM
8880'. CORRECTION OF (-35'). ~ . ~
19:00 - 19:45 0.75 WHIP P WEXIT MILL CEMENT FROM 9070' MD AT 19:00 HOURS. MILLING
AHEAD W/ CONSISTENT 3200 - 3400 PSI, 2.5K - 3K WOB
AT -7 FPH. MILL CEMENT TO 9080' CTMD.
19:45 - 20:30 0.75 WHIP P WEXIT PU CLEAN AT 28500 LB. PUH TO LOG. LOG CCL PASS
DOWN FROM 8740' TO 9080' MD. CORRELATE - WE HAVE
MILLED TO -6' BELOW WLEG. BEGIN POOH.
20:30 - 22:15 1.75 WHIP P WEXIT POOH.
OPEN EDC AT 7900' MD. JOG IN HOLE W/ OPEN EDC TO
CATCH ANY DEBRIS BETWEEN BIT AND EDC. POOH
PUMPING 1.7 BPM AT 3000 PSI WITH FULL RETURNS.
22:15 - 22:30 0.25 WHIP P WEXIT PJSM PRIOR TO LAYING DOWN MOTOR.
22:30 - 23:15 0.75 WHIP P WEXIT AT SURFACE. FLOW CHECK. UNSTAB. LAY DOWN
MOTOR AND ADJUST TO 0.7 DEGREE BEND. INSPECT
MILL. MILL IS 2.80" GO / 2.79" NOGO. DIAMONDS ON
NOSE OF MILL SHOW CONSIDERABLE, EVEN WEAR.
23:15 - 00:00 0.75 WHIP P WEXIT CHECK AND CLEAN HP FILTER. TROUBLESHOOT
BLOCKAGE IN CHOKE LINE WHICH WAS DISCOVERED
DURING MILLING RUN. TAKE APART CHOKE LINE
WHERE BLOCKAGE WAS HEARD AND CLEAR SAME
(BLOCKAGE WAS A -4" LONG CEMENT SHEATH).
IAP = 10 PSI
OAP = 140 PSI
CONTINUED ON DIMS REPORT 03/03/10.
3/3/2010 00:00 - 00:15 0.25 WHIP P WEXIT CONTINUED FROM DIMS REPORT 03/02/10.
PT CHOKE LINE TO 1500 PSI AFTER HAVING DISMANTLED
ONE CONNECTION TO REMOVE BLOCKAGE. GOOD.
00:15 - 00:55 0.67 WHIP P WEXIT MU BHA. MOTOR IS 2-3/8" XTREME MOTOR W/NEW 2.81"
GO / 2.80" NOGG PARABOLIC DIAMOND SPEED MILL.
MOTOR HAS 0.7 DEG BEND.
00:55 - 02:25 1.50 WHIP P WEXIT RIH TO 8100'. WEIGHT CHECK AT 8100': 28600 LB UP
WEIGHT, CLEAN. ONLINE AT 1.4 BPM AT 3025 PSI
FREESPIN. PVT: 237. RIH PAST PREVIOUS CEMENT TOP.
DID NOT SEE PREVIOUS CEMENT TOP (NO MOTOR
WORK, NO WEIGHT). HOLDING 20 DEG ROHS
ORIENTATION. ECD: 11.14 PPG.
02:25 - 03:15 0.83 WHIP P WEXIT LOG GR TIE-IN FROM 8760' AS PER GEO. TURNING MILL
WHILE LOGGING AT 1.4 BPM AT 3025 PSI (11.13 PPG
ECD). NO MOTOR WORK, NO WEIGHT BOBBLES.
CORRECTION OF (-27').
Printed: 3/19/2010 1:30:27 PM
•
BP EXPLORATION
Operations Summary Report
Page 4 c~ ~
Legal Well Name: MPF-82
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: REENTER+COMPLETE Start: 2/27/2010 End: 3/30/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/30/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
3/3/2010 03:15 - 05:50 2.58 WHIP P WEXIT INCREASE RATE TO 1.56 BPM AT 3260 FREESPIN. RIH TO
TAG HOLDING 20 DEG ROHS TF. ECD = 11.27 PPG. PVT:
244. IAP = 120 PSI. OAP = 170 PSI. ENGAGE CEMENT AT
9081.6' MD. BEGIN MILLING AHEAD AT 3400 PSI AND 2K
WOB. MILLING AHEAD AT -30 FPH.
MILL AT A CONSISTENT 30 FPH TO 9155' MD. PU CLEAN
AT 27800 LB.
05:50 - 06:30 0.67 WHIP P WEXIT BACKREAM CONTACT POINT (4' - 10' BELOW TT) TWICE
AS PER PROGRAM. MAKE ONE BACKREAM PASS AT 160
DEG LOHS ORIENTATION AS PER PROGRAM.
06:30 - 08:50 2.33 STWHIP P WEXIT WIPER TO ABOVE CEMENT, THEN POH CIRC THRU MILL
1.5/3000
08:50 - 09:30 0.67 STWHIP P WEXIT LD MILLING TOOLS AND LOAD OUT
09:30 - 10:10 0.67 STWHIP P WEXIT MU DUMMY WS ASSY W/ 2.70" MAX OD
10:10 - 11:40 1.50 STWHIP P WEXIT RIH W/ DUMMY WS ASSY CIRC THRU NOZZLE 0.53/1530
11:40 - 12:20 0.67 STWHIP P WEXIT LOG TIE-IN DOWN FROM 8920' TO 9010', CORK -33'
12:20 - 12:30 0.17 STWHIP P WEXIT 26K, 10K RIH TO 9042' AND SET DOWN 3K. PUH W/ 15K
OP. INCR RATE TO 1.42/3000. RIH AND SET DOWN AT
9038'. PUH W/ 6K OP
12:30 - 13:50 1.33 STWHIP N DPRB WEXIT POH CIRC THRU NOZZLE 1.56/2800
13:50 - 14:30 0.67 STWHIP N DPRB WEXIT LD DUMMY WS BHA
MU CLEANOUT ASSY W/ USED 2.80" D331, 2.73" SR ON
BTT STRAIGHT MOTOR
14:30 - 16:15 1.75 STWHIP N DPRB WEXIT RIH CIRC THRU MILL 0.31/1230 to 8100'
RIH AT 50'/MIN FROM 8100' CIRC THRU MILL 1.50/3300 TO
8230'
16:15 - 16:35 0.33 STWHIP N DPRB WEXIT LOG TIE-IN DOWN FROM 8930', CORK -29'
16:35 - 17:00 0.42 STWHIP N DPRB WEXIT RIH 15'/MIN 1.50/3230 (11.18 ECD) AND STALLED AT 9038'.
PUH W/ 10K OP. REAM IN HOLE SLOWER AND 9038' WAS
CLEAN. REAM TO 9041.2' AND HAD MW. REAM TO 9050',
CLEAN
17:00 - 17:30 0.50 STWHIP N DPRB WEXIT BACKREAM TO 9130' 29.5K, REAM BACK TO 9050' 8.OK,
CLEAN. REAM AT 10'/MIN TO TD, CLEAN AND HAD NO
ADDITIONAL MW FROM 9080' (START OF HS HOLE).
BACKREAM TO 8900' AT 15'/MIN 1.51/3230, CLEAN
17:30 - 17:40 0.17 STWHIP N DPRB WEXIT DRY DRIFT FROM 8900' TO PBD C~? 22'/MIN HAD MINOR WT
LOSS AT 9079', BUT OTHERWISE CLEAN
17:40 - 19:20 1.67 STWHIP N DPRB WEXIT BACKREAM TO TOC, THEN CIRC OOH THRU MILL
1.53/3260
19:20 - 19:40 0.33 STWHIP N DPRB WEXIT PJSM FOR LD CLEAN OUT BHA.
19:40 - 20:30 0.83 STWHIP N DPRB WEXIT FLOW CHECK. SB INJECTOR. SWAP BHA.
20:30 - 20:45 0.25 STWHIP N DPRB WEXIT PU INJECTOR. STAB ON W/ DUMMY WHIPSTOCK DRIFT
WITH UP ONLY JARS.
~
20:45 - 22:10 1.42 STWHIP N DPRB WEXIT RIH WITH DUMMY WHIPSTOCK DRIFT. ~
22:10 - 23:00 0.83 STWHIP N DPRB WEXIT LOG TIE-IN. CORRECTION OF (-53').
23:00 - 00:00 1.00 STWHIP N DPRB WEXIT DRIFT TO 9135' MD WHILE CIRCULATING THROUGH
NOZZLE AT 0.45 BPM AT 1540 PSI. ENCOUNTER TIGHT
SPOT AT 9023' MD (SETTING DOWN 3K WOB AT THIS
DEPTH AND OVERPULLING BY 6K BETWEEN 9023' MD
AND 9014' MD). OTHERWISE, CLEAN DRIFT DOWN TO
9135' MD. TAG HARD, CLEAN BOTTOM AT THIS DEPTH.
THE DIFFERENTIAL DEPTH FROM OUR HARD TAG TO
OUR OVERPULL DEPTH IS THE SAME AS THE
Printed: 3/19/2010 1:30:27 PM
•
BP EXPLORATION Page 5 ate
Operations Summary Report
Legal Well Name: MPF-82
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: REENTER+COMPLETE Start: 2/27/2010 End: 3/30/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/30/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
3/3/2010 23:00 - 00:00 1.00 STWHIP N DPRB WEXIT DIFFERENTIAL DEPTH FROM 9155 (WHERE BOTTOM
SHOULD BE) TO 9042 (WHERE HARD SPOT FOUND ON
MILL RUN). ADDITIONALLY, CORRECTION IS
ABNORMALLY HIGH. REQUEST REPEAT TIE-IN.
IAP = 25 PSI
OAP = 70 PSI
CONTINUED ON DIMS REPORT 03/04/10
3/4/2010 00:00 - 00:40 0.67 STWHIP N DPRB WEXIT CONTINUED FROM DIMS REPORT 03/03/10
IAP = 25 PSI
OAP = 60 PSI
PUH TO REPEAT TIE-IN. CORRECTION OF (+24').
REVIEW WITH MWD. DISCOVER THAT THEY FORGOT TO
INPUT THE DEPTH OFFSET FROM NOZZLE TO GR ON
THE LAST TIE-IN. RIH TO DRY DRIFT TO TD. SEE -2K
WEIGHT BOBBLE AT 9042' MD.
00:40 - 01:15 0.58 STWHIP N DPRB WEXIT DRY DRIFT TO TD AT 9157' MD. PU CLEAN AT 32.5K LB.
ONLINE WITH PUMPS AT 1.5 BPM AT 2900 PSI. PUH
PUMPING AT THIS RATE - OVERPULL BY 3K LB FROM
9043' MD TO 9037' MD.
DOWN ON PUMP. RBIH TO REPEAT DRY DRIFT BOTH
DIRECTIONS. SEE <1000 LB WEIGHT BOBBLE RIH DRY
PAST 9043' MD. PUH DRY (DRY UP WEIGHT OF 39K LB)
OVERPULL FROM 9044' MD - 9037' MD TO 42K LB.
01:15 - 03:30 2.25 STWHIP N DPRB WEXIT RBIH TO BOTTOM. ONLINE AT 1.5 BPM DOWN CT AT 2890
PSI. CIRCULATE AT 1.5 BPM AND PULL TO SURFACE.
03:30 - 03:45 0.25 STWHIP N DPRB WEXIT PJSM PRIOR TO LD DRIFT AND MU WHIPSTOCK.
03:45 - 04:30 0.75 STWHIP P WEXIT LD DRIFT ASSEMBLY. NO VISIBLE MARKS ON NOZZLE.
MU WHIPSTOCK SETTING ASSEMBLY.
04:30 - 06:35 2.08 STWHIP P WEXIT RIH W/ WHIPSTOCK SETTING ASSEMBLY CIRCULATING
AT 0.3 BPM AT 970 PSI THROUGH OPEN EDC.
06:35 - 07:05 0.50 STWHIP P WEXIT LOG TIE-IN DOWN FROM 8930' 0.30/1380 10.5K, CORK -28'
07:05 - 07:30 0.42 STWHIP P WEXIT RIH W/ NO WT LOSS TO SETTING DEPTH AT 9133.8'
BOWS. CLOSE EDC AND SET WS W/ 4380 PSI AND
STACK 3.5K WOB. PUH 34K, TEXTBOOK SET. LEFT WS
W/TOP AT 9125'
07:30 - 09:00 1.50 STWHIP P WEXIT POH CIRC THRU TOOL 0.60/1540
09:00 - 10:00 1.00 STWHIP P WEXIT lD WS SETTING ASSY
MU MILLING ASSY W/ 2.74" WM, 2.73" SR AND 0.7 DEG BHI
MOTOR
10:00 - 11:45 1.75 STWHIP P WEXIT RIH CIRC THRU MILL 0.28/1410 P ~
11:45 - 12:10 0.42 STWHIP P WEXIT LOG TIE-IN DOWN FROM 8930', CORK -29'
12:10 - 12:25 0.25 STWHIP P WEXIT RIH 0.28/1390 CLEAN TO TAG AT 9125.0'
PUH 34K, START MOTOR 1.53/3130 PVT 252
C1~ ,4- 12:25 - 15:45 3.33 STWHIP P WEXIT BEGIN TIME MILLING FROM FIRST MW A 9124.0
~ K~ ~
~~ ~ ~ 1.53/3150/58 W/ 0-50 PSI DIFF, 0-0.5K WOB W/ 11.08 ECD
PVT 255
15:45 - 18:00 2.25 STWHIP P WEXIT 9127.0' 1.53/3150/5L W/ 50-150 PSI MW, 1.0-2.5K WOB W/
11.00 ECD PVT 258
18:00 - 19:00 1.00 STWHIP P WEXIT 9128.8' 1.53/3150/18 W/0-150 PSI MW, 1.5-3.5K WOB W/
10.98 ECD.
AT 9128.9, BEGIN STACKING WEIGHT WITH NO
ADDITIONAL MOTOR WORK. STOP AND LET EXISTING
MOTOR WORK MILL OFF. BEGIN TO MILL AHEAD WITH
~~`~
Printed: 3/19/2010 1:30:27 PM
Trpa• Cameron 3 1/8", 5M ~
Wallhaar€MC 11" x 7-1/16" 5M,
Gen. 5a w/ 6" x 3.5" FMC Tbg. Hnr.
w/ 3.5' eue threads top and btm.
3" CIW H BPV profile
20" 91.51# ppf, H-40 78'
KOP @ 945' - 10 degrees.
Max. hole angle = 53 deg.
Hole angle thru' perfs = 24 degrees.
9 5/8", 40 ppf, L-80 Btrc. ~ 5311'
M P U F ~pL ~ Orig. KB EI 39.95 ft (Doyon -141
Orig. GL Elev. = 11.30 ft
DF Elev. = 28.65 ft
3.5" 9.3 ppf, L-80 nsct tubing.
( drift id = 2.992", cap = 0.0087 bpf )
7" 26 ppf, L-80, btc mod. casing
( drift id = 6.276", cap. = 0.0383 bpf )
Perforation Summary
Ref log: SWS USIT log dated: 9/6/00
Size S f Interval TVD
2" 6 9,180'- 088'- 7,108'
2" 6 ~ ,109'- 7,131'
2" ~ - 9,256' 7,139'- 7,157'
2" Power Jet HSD 6spf 60 deg. phasing
9 5/8" Tam port
collar 1009'
HES X-Nipple 2.813" id 2233'
Caliper survey run 11/1/09 indicates
slightly cork screwed tubing.
Top of 17 ppg cement kickoff 8968'
plug
HES X-Nipple 2.813" id 9012'
Baker 7"x 4.5" SAB-3 perm pkr. 9034'
HES XN-Nipple 2.750" ID no-go 9059'
WLEG 9072'
09/07/00 M. Linder Drilled and completed by Doyon 141
10/24/00 MDO Perforated
7" HES float collar 9341'
7" HES float shoe 9425'
MILNE POINT UNIT
WELL No.: F-82i
API : 50-029-22971-00
~~7~7~MU
7
BP EXPLORATION
~
~
' F~ a f„_~ ~ a t~~ i~s ~' k u.~ 4 .... Y .„ i i 'E`
~
~~
~~`t ~ ~ ~~G4 ~z f . r~~ ~~
~ ~ ~~ 4~~: ~, ~tF ~~ B'Y~
~ ` SEAN PARNELL
OV
~, ~ ~ f
' a a
t ~
~i 6 k ~ p ~ G-.. t ~~ ti k9 4 ;~`"< ~
¢,
5
+ , ~G
ERNOR
>
,
~. , ~ .~} ~ ~
L' ,. x_., ~.:-.:
, ~ ,..._a ~~ ~, ~
..,~_. ~.,k r
~1 m~i .,_.L ~= k 1:. :
`
~
~
~t~~ ~~~~+
~SSA OI~ t'u~i~ t]ray7 ~~
COI~TSER'QATIOI~T COl-II-IISSI011T ;
333 W. 7th AVENUE, SUITE 100
a ANCHORAGE, ALASKA 99501-3539
..-.... .r.;~<:.,~...,...,.:.., .PHONE"""(3d7) 279-1433
~ FAX (907)276-7542
Mr. Jvhn McMullen
Engineering Team Leader
BP Exploration (Alaska) Inc.
P.O. Box 196612 : i r i~`,~ ,. V~ ~,E~~~
Anchorage, Alaska 99519-6612 ~°~~~~~ ~ ~~ ~.,~
~0~~~
Re: Milne Point Unit, Kuparuk Oil Pool, MPF-82
Sundry Number: 309-370
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Comxnission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the ne~ working
day if the 23rd day falls ~ on a holiday or weekend. A person may not appeaJ.
a Commission decision to Supe~rior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
Chair
DATED this 2-~_ ~
~ day of November, 2009
Encl.
- ~d~ ~~`~~ ~ STATE OF ALASKA
,v ~~~;` ALAS~IL AND GAS CONSERVATION COMMI~N
~ ~~~ ~ APPLICATION FOR SUNDRY APPROVAL
~ 20 AAC 25.280
~~~~I~~~
~OV ~ 6 a2a~l~
1. Type of Request: ~~a~~$ [~j~ ~~j~S CO(IS. COli1i111S31
'~ Abandon ^ Suspend ^ Operational Shutdown ^ Perforate ^ Re-Enter Suspended~j y,
~nOra~
^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other Specify: """
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Time Extension
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ^ Development ^ Exploratory 200-125 '
3. Address: ~ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22971-00-00 ~
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes:
~ ~PF~82
.
Spacing Exception Required? ^ Yes ~ NO
9. Property Designation:
~ 10. Field 1 Pool(s): ~' ~~ t'r~
ADL 025509 & 388235 Milne Point Unit / Kuparuk River s' %(~ ~' ~~
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): EffeCtive Depth TVD (ft): Plugs (measured): Junk (measured):
9440' • 7327' ~ 9341' 7235' None None
Casin Len th S'ize MD ND Burst Colla
Structural
Conductor 1' " 11 ' 11 ' 14 47
Surface 5282' 9-5/8" 5311' 42 6' S750 30 0
Intermediate
Production 4' 7" 73 4' 7240 1
Liner
Perforation Depth MD (ft): Perforation Depth 7VD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
9180' - 9256' 7088' - 7157' 3-1/2", 9.2# L-80 9072'
Packers and SSSV Type: Baker'SAB-3' packer Packers and SSSV 9034' / 6957'
MD (ft) and ND (ft):
12. Attachments: 13. WeU Class after proposed work:
~ Description Summary of Proposal ^ BOP Sketch
^ Exploratory ^ Development ~ Service
^ Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: November 20,2009 ' ^ Oil ^ Gas ^ WDSPL ^ GSTOR '~ Abandoned
16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG
Commission Representative:
17. I hereby certify that the foregoing is true and corred to the best of my knowledge. Contact Sean McLau hlin 564-4387
Printed Name Jo ~ M 4 Title Engineering Team Leader
Prepared By NamelNumber:
Signature Phone 564-4711 Date << ~ Q~ Terrie Hubble, 564-4628
Commission Use Onl
Conditions of approval: Notify Commission so that a representative may witness ~/~~ ~ O
/ Sund
Number:
(~~
~
ry
^ Plug Integrity IJ BOP Test ^ Mechanical Integrity Test ^ Location Clearance
.~ 3 saa ~f` ~o~' ~s~
` `
Other. n L
O S~ ~ h n w~-wv L ST ~~'~' j
~ Z
s~a
'
~
.
+
Subsequent Form Required: /~ 4 ~ ~.
C (
APPROVED BY
I( 1 2 ~
Approved By: COMMISSIONER THE COMMISSION Date
-403 d 07 ' Submit In Duplicate
R ~~ a~~s ~ ~ ~ ~ i ~ A L , ~~.9.n~ ~ ~~~ ~~~~
~
n
~ ~
To: Tom Maunder
Petroleum Engineer ~
Alaska Oil & Gas Conservation Commission ~
From: Sean McLaughlin
CTD Engineer
Date: October 28, 2009
Re: Milne Point F-82 Sundry Approval
Sundry approval is requested to abandon perforations on well MPF-82 in preparation for a CTD
sidetrack. MPF-82 is a Kuparuk A sand injector drilled in October 2000 to support MPL-40. The injector -
pressured up quickly and did not properly support the producer. MPF-82A will be drilled to a more optimum
location.
The sidetrack, MPF-82A, is scheduled to be drilled by Nordic 2 starting December 15, 2009 using the managed
pressure drilling technique. This horizontal lateral will target Kuparuk the A sand to improve injection' The
perforations in the parent well will be abandoned with a cement plug in the 7" casing. The "A" sidetrack lateral
will exit the parent well at 9,125' md in the C sand and drill a-1700' lateral to a TD of 10,820' md. The sidetrack
will be completed with a solid, cemented and perforated 2-3/8" liner. The following describes work planned. A
schematic diagram of the proposed sidetrack is attached for reference.
~O^ Gv r.
CTD S+detrack Summarv ~ /y'_"" Il/olr- /
Pre-CT Rig Work: The pre CTD work is slated to beain November 20, 2009.
1. MIT-IA to 3000 psi
2. Dummy whipstock drift
3. Mill XN nipple
4. Cement from PBTD to tailpipe (pump 20 bbl of 17ppg cement)
Rig Sidetrack Operations: (Scheduled to begin on December 15, 2009 using Nordic rig 2) ~ ~li-~,
1. MIRU Nordic Rig 2 5~ ~70
2. NU 7-1/16" CT Drilling BOPE and test ~t~(•
3. Mill 2.8" pilot hole to 9i 50'
4. Run dummy whipstock drift
5. Set whi stock hi hside at 9 125' •
6. Mill 2.8" window in 7" casing from mechanical whipstock
7. Drill build section with 3" bicenter bit, and land well in target A sand. r
8. Drill lateral section to 10,820' I TD
9. Flow check well and lay in KWF as needed.
10. Run and cement a 2-3/8" L-80 liner string. Expect -7 bbl of 15.8 ppg cement
11. Make a cleanout run with mill and motor.
12. Make a logging run with a memory SWS GR-CCL logging tool. •
13. Test Liner lap to 2000 psi.
14. Perforate well.
15. Lay bleach in the lateral and KFW in the cased hole.
16. FP well to 2000'.
17. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi.
18. RDMO Nordic 2.
Post-Rig Work:
1. Re-install wellhouse and FL's.
2. Pull BPV.
Sean McLaughlin
CTD Engineer
CC: Well File
Sondra StewmanlTerrie Hubble
Trc°:Cameron 3 1/8", 5M
WnllhcacFMC 11" x 7-1/16" 5M,
Gen. 5a w/ 6" x 3.5" FMC Tbg. Hnr.
w/ 3.5' eue threads top and btm.
3" CIW H BPV profile
20" 91.51# ppf, H-40 78'
KOP @ 945' - 10 degrees.
Max. hole angle = 53 deg.
Hole angle thru' perfs = 24 degrees.
~ 9 5!8", 40 ppf, L-80 Btrc. ~ 5311'
3.5" 9.3 ppf, L-80 nsct tubing.
( drift id = 2.992", cap = 0.0087 bpf )
7" 26 ppf, L-80, btc mod. casing
( drift id = 6.276", cap. = 0.0383 bpf )
Perforation Summarv
Ref log: SWS USIT log dated: 9/6/00
Size S f Interval ND
2" 6 9,180'- 9,200' 7,088'- 7,108'
2" 6 9,204'- 9,224' 7,109'- 7,131'
2" 6 9,236'- 9,256' 7,139'- 7,157`
~ 2" Power Jet HSD 6spf 60 deg. phasing
DATE REV. BY COMMENTS
09/07/00 M. Linder Drilled and completed by Doyon 141
10/24/00 MDO Perforated
9 5/8" Tam port
collar 1009'
HES X-Nipple 2.813" id 2233'
HES X-Nipple 2.813" id 9012'
Baker 7"x 4.5" SAB-3 perm pkr. 9034'
HES XN-Nipple 2.750" ID no-go 9059'
WLEG 9072'
7" HES float collar 9341'
7" HES float shoe 9425'
MILNE POINT UNIT
WELL No.: F-82i
API : 50-029-22971-00
M PU F~vL~ Orig. KB .= 39.95 ft(Doyon -1
Orig. GL Elev. = 11.30 ft
DF Elev. = 28.65 ft
Pro~sed MPU F-82Ai D ST'°°~°"~"'
Tree: Cameron 3 1/8 , 5M
Welihead: FMC 11 " x 7-1 /16" 5M, O~ig. K ev. - 39.95 ft
Gen. 5a w/ 6" x 3.5" FMC Tbg. Hnr. Orig. GL Elev. = 11.30 ft
w/ 3.5' eue threads top and btm. DF Elev. - 28.65 ft
3" CIW H BPV proflle
20" 91.51 # ppf, H-40 78' 9 5/8" Tam port
KOP C~ 945' - 10 degrees.
Max. ho~e angle = 53 deg.
Hole angle thru' perfs = 24 degrees.
9 5/8", 40 ppf, L-80 Btrc. ~ 5311 '
3.5" 9.3 ppf, L-80 nsct tubing.
( drift id = 2.992", cap = 0.0087 bpf )
7" 26 ppf, L-80, btc mod. casing
( drift id = 6.276", cap. = 0.0383 bpf )
2-3/8" Liner top at 9,045'
Whipstock in Pilot Hole @ 9,125' ~
Perforation Summarv
Ref log: SWS USIT log dated: 9/6/00
2° 6 9,1 SO'- 9.200' 7.088'- 7.108' I
2" 6 9,204'- 9,224' 7.109'- 7,131'
2° 6 9,236'- 9,256' 7,139'- 7,157
2" Power Jet HSD 6spf 60 deg. phasing
collar 1009'
HES X-Nipple 2.813" id 2233
HES X-Nipple 2.813" id ~~ 2~
Baker 7°x 4.5" SAB-3 perm pkr. 9034'
HES XN-Nipple 2.750" ID no-go ~59~
WLEG 9072'
2-3/8" Solid/Cemented Liner
TD = 10,820' .
~- r --- -- _.
09/07/00 M. Linder Drilled and completed by Doyon 141
10/24/00 MDO Perforated
3" Open Hole
7" HES fbat collar ~41
T' HES float shoe ~25~
MILNE POINT UNIT
WELL No.: F-82i
API : 50-029-22971-00
BP EXPLORATION
UNDER EVALUATION: MPG (PTD #1910230) Place on injection for IC MITIA Page of
~ ~ ~~
Sent: Sunday, February 15, 2009 8:28 PM
To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MP rodudion Optimization
Engineer; MPU, Wells Ops Coord2; MPU, Area Manager; NSU, ADW Well Operations Supervisor; Engel, Harry R; Ros rg, R Steven
Cc: Holt, Ryan P (ASRC); Engel, Harry R; NSU, ADW Well Integrity Engineer
Subject: UNDER EVALUATION: MPG-OS (PTD #1910230) to place on Injection for
All,
MPG-05 (PTD #1910230) has been reclassifi as Under Evaluation so that the well may be placed on injection,
allowed to thermally stabilize, and an AO witnessed MITIA may be conducted. A this time there are no
indications of integrity concerns. The nulus pressures have been less than. 100 psi since the well was shut-in
11 /13/05.
Please let me know if t e are any questions.
Thank you,
Anna ~Du , ~'.~.
Well Inte ity Coordinator
GPB ells Group
P ne: (907) 659-5102
ager: (907) 659-5100 x1154
JAN ~ 1.01
From: NSU, ADW Well Integrity Engineer
Sent: Thursday, October 23, 2008 12:41 PM
To: MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Production Optimization Engineer; MPU, Wells Ops Coord2; MPU, Area
Manager; NSU, ADW Well Operations Supervisor
Cc: NSU, ADW Well Integrity Engineer; Holt, Ryan P (ASRC); Engel, Harry R
Subject: NOT OPERABLE: MPF-74 (PTD #1961080), MPG-05 (PTD #1910230), MPF-82 (PTD #2001250), MPF-90 (PTD #2012110)
Hi all,
Milne Point wells MPF-74 (PTD #1961080), MPG-05 (PTD #1910230) MPF- P( TD #~QQ~Q ,and MPF-90
(PTD #2012110) are being reclassified to Not Operable due to being overdue for UIC MITIA testing. These wells
are currently shut-in for reservoir management. When Milne Point operations are ready to return these wells to
injection, please notify the Well Integrity Coordinator. The WIC will then obtain an agreement with the AOGCC to
have these wells online for compliance testing.
Please let us know if you have any questions.
Thank you,
Anna ~Du6e, ~? E.
Well Integrity Coordinator
GPB Wells Group
Phone: (907) 659-5102
Pager: (907) 659-5100 x1154
1 /22/2010
F:\LaserFiche\CvrPgs _I nserts\M icrofilm _ Marker.doc
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
'l,...
·tr...""I·
......'.
"... ,."-........
.~~""..IW- .........
)
')
Permit to Drill 2001250
MD 9440 TVD
DATA SUBMITTAL COMPLIANCE REPORT
1116~2003
Well Name/No. MILNE PT UNIT KR F-82 Operator BP EXPLORATION (ALASKA) INC
7327 Completion Dat 10/22/2000 Completion Statu WAGIN Current Status WAGIN
APl No. 50-029-22971-O0-00
REQUIRED INFORMATION
UIC Y
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
T
L L
D D
R R
D D
L L
R R
R R
D D
R R
D D
L L
L L
L L
(data taken from Logs Portion of Master Well Data Maint
Interval
Log Log Run OH I Dataset
Name Scale Media No Start Stop CH Received Number Comments
42 3808 Open 5/9/2001 10000,) 42-3808 ...............
42 9376 Open 5/9/2001 10058,'/'42-9376
42 9376 Open 7/26/2001 1020'/~--~42-9376
42 3808 Open 7/26/2001 10206-~42-3808
5 FINAL 7500 9260 CH 9/15/2000 BL(C) 7500-9260
10000 FINAL 42 3808 ch 51~812001 10000 42-3808 Digital Data
ff'..~4S~rific,~tion FINAL ch 5/18/2001 LIS Yerification ~aper copy
~ FINAL 42 9376 ch 5/18/2001 10058~2-9376 Digital Data
~O'~RES 2/5 FINAL 0 9440 OH 7/2/2001 0-9440 BL, Sepia
(L~(~erificafion FINAL ch 5/18/2001 LIS Verification Paper Copy
~ficafion FINAL CH 6/14/2001 LIS Verification, Paper Copy
· I~7 FINAL ' 42 9376 OH 6/14/2001 10207//42-9376, Digital Data
~fion FINAL CH 6/14/2001 LIS Verification, Paper Copy
~1~2'06 FINAL 42 3808 OH 6/14/2001 102065~42-3808, Digital Data
~D"G~ROP/RES 2/5 FINAL 0 9440 OH 7/2/2001 0-9440 BL, Sepia
4.~'GR 2 FINAL 0 3846 OH 7/2/2001 0-3846.5 BL, Sepia
"~PJ ROP 2 FINAL 0 3846 OH 7/2/2001 BL, Sepia
0-3846
Well Cores/Samples Information:
Name
Interval Dataset
Start Stop Sent Received Number Comments
ADDITIONAL INFORMATION
Permit to Drill 2001250
MD 9440 TVD
Cored? Y ~
Well
Chips Received? ~
Analysis ~
R ~.c.~.iv~.d ?
DATA SUBMITTAL COMPLIANCE REPORT
1116~20O3
Well Name/No. MILNE PT UNIT KR F-82
Operator BP EXPLORATION (ALASKA) INC
7327
Completion Dat 10/22/2000
Completion Statu WAGIN Current Status WAGIN
Daily History Received? {~)/N
Formation Tops (~ N
APl No. 50-029-22971-00-00
UIC Y
Comments:
Compliance Reviewed By:
Date:
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - MPF-82, AK-MM-00158
June 27, 2001
MPF-82: 2OO-i"/-~
2"x 5" MD Resistivity and Gamma Ray Logs:
50-029-22971-00
2" x 5" TVD Resistivity and Gamma Ray Logs:
50-029-22971-00
2"x 5" MD Neutron & Density.Logs:
50.029-22971-00
2"x 5" TVD Neutron & Density Logs:
50-029-22971-00
1 Blueline
1 Rolled Sepia
1 Blueline
1 Rolled Sepia
1 Blueline
1 Rolled Sepia
1 Blueline
1 Rolled Sepia
PLEASE ACKNOWLEDGE RECEIFr BY SIGNING AND' RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Atto: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
'JUL 0 2 2001
Alala Oil & ga,s ~.'~n
WELL LOG TRANSMITTAL
To: State of Alaska June 13, 2001
Alaska Oil and Gas Conservation Comm.
Atm.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
MWD Formation Evaluation Logs MPF-82, AK-MM-00158
1 LDWG formatted Disc with vedtication listing.
APl#: 50-029-22971-00
PLEASE ACKNOWLEDGE RECEIFr BY SIGNING A COPY OF THE TRANSMITTAL LE'I-I'ER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Atto: Jim Galvin
'6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center.LR2-1"
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date:
Si l
Note: This Data replaces any Previous' Data for well MPF-82.
RECEIVED
JUN'l, 4 2001
.'~
R EPROCESS. ED
IH;$ REPLACES AL~"P"EvIOLJ$ DATA
DATE:_ .............. "'.., ."'.
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs MPF-82 PB1, AK-MM-00158
--
1 LDWG formatted Disc with verification listing.
API#: 50-029-22971-70
May, 09, 2001
PLEASE ACKNOWLEDGE RECEIVF BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Atto: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date:
RECEIVED
2001
Nadm Oil & Gas Cons. Cm~
STATE OF ALASKA ·
ALASKJ[," ,k AND GAS CONSERVATION COM~' ,SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service Water & Gas Injector
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 200-125
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 .~; 50-029-22971-00
4. Location of well at surface ........ t-TV~- ~ 9. Unit or Lease Name
1991' NSL, 3010' WEL, SEC. 06, T13N, R10E, UM '."
At top of productive interval · /4:~, Z..~., ~.:z.~ t ~~ [ Milne Point Unit
806" SNL, 2375' WEL, SEC. 12, T13N, R09E, UM .~ :'...
At total depth '_._.'.~-=,._ -.,.. ~ ' ['~~ 10. Well Number
864' SNL, 2463' WEL, SEC. 12, T13N, R09E, UM i~i~ .... MPF-82i
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Milne Point Unit / Kuparuk River Sands
KBE = 42.15' ADL 388235
12. Date Spudded 113. DateT. D. Reached114. Date Comp., Susp., or Aband' 115. Water depth, if offshore 110. Nc. of Completions
8/27/2000 9/4/2000 10/22/2000 N/A MSL I One
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set121. Thickness of Permafrost
9440 7327 FTI 9341 7235 FT [] Yes [] No N/A MDI 1800' (Approx.)
22. Type Electric or Other Logs Run
DIR, GR, ESS, Gyro, RES, PWD, CCL, USIT
23. CASING, LINER AND CEMENTING RECORD
CASING S~- i i~NG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 54.5# K-55 29' 110' 30" 260 SX Arctic Set (Approx.)
9-5/8" 40# L-80 29' 5311' 12-1/4" B25 sx AS 3 Lite, 290 sx Class 'G'
7" 26# L-80 / N-80 26' 9426' 8-1/2" 180 sx C1~_$$ 'G'
24. Perforations op. en to. P.roductipn (M.D+,TVD of Top and 25. TUBING RECORD
~ottom and imervm, raze an(] number)
SIZE DEPTH SET (MD) PACKER SET (MD)
2" Gun Diameter, 6 spf 3-1/2", 9.2#, L-80 9072' 9034'
MD TVD MD TVD
9180' - 9200' 7088' - 7106'
9204' - 9224' 7110' - 7128' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
9236'-9256'
7139'-7157'
Freeze Protect with 65 Bbls of Diesel
N0V 28 000
,~lr~l~i Oil & Gas COILS,
,,
27. Ancn0t=,l= PRODUCTION TEST
bate First Production Method of Operation (Flowing, gas lift, etc.)
October 30, 2000 Water & Gas Injector
Date of Test ;HoUrs Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS'OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
__
Form 10-407 Rev. 07-01-80
ORIGINAL
Submit In Duplicate
29. 30.
Geologic Markers Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered
Depth Depth and gravity, GOR, and time of each phase.
Kuparuk 'C' 9118' 7032'
Kuparuk 'B' 9135' 7047'
Kuparuk 'A' 9174' 7082'
TKA3 9182' 7090'
TKA2 9203' 7109'
TKA1 9232' 7135'
9294' 7192'
' RECEIVED
NOV 2. 8 2000
Alaska 0il & Gas Cons. Commission
~ch0rage
31. List of Attachments: Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble,~~.~,, ~ Title TechnicalAssistant Date
MPF-82i 200-125
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. /Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: MPF-82i
Common Name: MPF-82
Test Date, Test.'TyPe ": : .... ' ................ '
"' !" ,' 'TestDepthi(TMD).:. '. ~ "TeSt' DePth~(TV..D), .... ," AMW Surface Pressure Leak Off Pressure (BHP) EMW
.. ..:...,,.:::.....,:., ...., ............. : : , :~ :,.,, ...... , .. .
9/1/2000 FIT 5,311.0 (fi) 4,265.0 (fi) 8.50 (ppg) 670 (psi) 2,553 (psi) 11.52 (ppg)
Printed: 9119/2000 4:12:02 PM
(
K i:: L i:: i V i.. j)
Page '1 of
BP AMOCO NOV ~ 8 ~000
Operations Summa~ Report
Alaska 011 & Gas Cons. Commission
ILegal Well Name: MPF-82i
Anchor~e
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: DRILL+COMPLETE Start: 8/26/2000 End: 9/7/2000
Contractor Name: DOYON Rig Release: 9~7/2000 Group: RIG
Rig Name: DOYON 141 Rig Number:
Date From - To Hours Activity Code Phase Description of Operations
8/26/2000 00:00 - 06:00 6.00 MOVE PRE Move rig from F pad and spot sub over MPF-82
06:00 - 18:00 12.00 MOVE PRE Finish moving the rest of the modules and spot same. N/U diverter.
Change out saver sub on top drive. P/U 5" handling tools and Icad pipe
shed and strap 5" drill pipe. Accept rig at 1800 hrs.
18:00 - 22:30 4.50 DRILL SURF PIU and stand back 144 jts drill pipe and 20 jts hwdp.
22:30 - 23:00 0.50 DRILL SURF Test diverter and accumulator. Check alarms. Test witnessed by Jeff
Jones with AOGCC.
23:00 - 00:00 1.00 DRILL SURF M/U bha #1. Bit, 1.5 motor, mwd tools and orient. Finish pu jars and
hwdp.
8/27/2000 00:00 - 00:30 0.50 DRILL SURF Fill hole with mud and prime mud pumps. Check for leaks.
00:30 - 00:00 23.50 DRILL SURF Spud (~110' and directional drill to 1828'. Only had to make one check
shot with gyro. Art-7 hrs, Ast-10 hrs. Rop-101 fph. Drilling with 400-588
gpm with 2200 psi. 30-35k wob and 7000# torque on botom. Maintain
9.2 ppg mud with 150 vis.
8/28/2000 00:00 - 05:00 5.00 DRILL SURF Directional drill 1828'-2479'. Art-1.5 hrs; Ast-2.5 hrs. Rop-162 Fph.
Drilling with 588 gpm with 1700 psi, 30-35 K Wob, and 7000~ Torque.
Maintain 9.2 ppg with 150 vis.
05:00 - 06:00 1.00 DRILL SURF Circulate hole clean.
06:00 - 07:00 1.00 DRILL SURF 10 stand wiper trip to 1553'. No problems. Wash last stand to bottom.
07:00 - 20:30 13.50 DRILL SURF Directional drill 1828'-2479'. Art-l.5 hrs; Ast-2.5 hrs. Rop-161 Fph.
Drilling with 588 gpm with 1700 psi, 30-35 K Wob, and 7000~ Torque.
Maintain 9.2 ppg with 150 vis.
20:30 - 22:00 1.50 DRILL SURF Circulate hole clean.
22:00 - 00:00 2.00 DRILL SURF 25 stand wiper trip to 1533'. Trip out of hole was good except for tight
spot at 2260'-2220'. Worked tight spot and continued out of hole.
8/29~2000 00:00 - 01:00 1.00 DRILL SURF Tripping in hole. Hit bridge at 2234'. Washed and reamed through
section with 50 rpms and 50 strokes at 200+fph. Washed and reamed
to 2296 and surveyed. Surveyed indicated we had Iow sided the well
and sidetracked.
01:00 - 04:00 3.00 DRILL SURF Directional drill 2296' -2665'. Art-l.5 hrs, Ast-l.1 hrs. Rop=142 fph. Drill
with 545 gpm with 1850 psi. 10-25K wob, and 7000# torque.
04:00 - 04:30 0.50 DRILL SURF Cir hole clean
04:30 - 05:30 1.00 DRILL SURF 8 stand wiper trip 1736'. No problems.
05:30 - 18:30 13.00 DRILL OTHR SURF Directional drill 2665-3843'. Art-4.5 hrs, Ast-4.3 hrs. Rop=182 fph. Drill
with 545 gpm with 1850 psi. 10-25K wob, and 7000# torque.
18:30- 19:30 1.00 DRILL OTHR SURF Circulated hole clean.
19:30 - 22:00 2.50 DRILL OTHR SURF Short trip from 3843'-1550'. First 10 stands off bottom pulled 5-20K over
and showed signs of swabbing. Pulled good to 2386'. Pumped out of
hole fro 2386'-1550'. Ran back to 3781' with no problems. Washed and
reamed from 3781 '-3843' for safety.
22:00 - 00:00 2.00 DRILL SURF Directionally drill from 3843'-4095'. ART 1.75 hrs AST 0 hrs. ROP
144'/hr. Drilling with 546 gpm at 2000 psi, 20-30K WOB and 12000 ftlbs
of torque. Mud wt 9.1 ppg at 130 vis.
8/30/2000 00:00 - 16:30 16.50 DRILL SURF Directional drill maintaining 45? tangent section from 4095'-5325'.
ART-9.25 hrs AST-3.25 hrs. ROP 80-100'/hr. Drilling with 546 gpm at
2280 psi, 20-30K WOB and 15000 ftlbs of rotary torque.
16:30 - 18:30 2.00 DRILL SURF Pumped 20 bbls high vis sweep and circulated hole clean.
18:30 - 22:30 4.00 DRILL SURF Short trip from 5325'-HWDP at 810'. Recorded up weight, down weights
Printed: 9119/2000 4:11:44 PM
BP AMOCO R E C E ! V E ~)lge 2 of 6
Operations Summary Report NOV 2 8 2000
Legal Well Name: MPf-82i A/as~a 0il &,~._L____Gas Cons. C0mlrlJssJoll
Common Well Name: MPF-82 Sp~Uc~~8/27/2000
Event Name: DRILL+COMPLETE Start: 8~26~2000 End: 9/7/2000
Contractor Name: DOYON Rig Release: 9~7/2000 Group: RIG
Rig Name: DOYON 141 Rig Number:
Date From - To Hours Activity Code Phase Description of Operations
8/3012000 18:30 - 22:30 4.00 DRILL SURF and rotating weight while making short trip. Pumped out of hole as a
precaution from 2386'-1550'. Ran back in hole to bottom with no
problems.
22:30 - 00:00 1.50 DRILL SURF Pumped 30 bbls high vis sweep and circulated hole clean. Rotated and
reciprocated pipe while treating mud for casing job.
8/31/2000 00:00 - 01:00 1.00 DRILL SURF Finished circulating out sweep and treating mud for casing job.
Reciprocated and rotating pipe while conditioning hole. Dropped ESS
tool and pumped slug.
01:00 - 03:30 2.50 DRILL SURF Pulled out of hole to 2386'. As a precaution pumped out of hole from
2386'-1550'. Finished pulling out of hole with no problems.
03:30 - 05:30 2.00 DRILL SURF Laid down BHA. Laid out 14 jts of HWDP, Jars, Flex collars, stabs,
UBHO sub. Drain motor. Break bit, adjust motor to 07, laid down MWD
and motor. Cleared floor.
05:30 - 08:00 2.50 CASE SURF Changed bails, picked up fill up tool, rigged up casing slips, elevators
and casing tongs. Held PJSM with crew.
08:00 - 13:00 5.00 CASE SURF Ran 129 jts of 9-5/8" 40 L-80 BTC casing to 5311'. No problems
running to bottom. Rigged down fill up tools and casing slips. Made up
Dowell cementing head.
13:00 - 17:00 4.00 CASE SURF Broke circulation slowly at 3 bpm at 290 psi. Slowly brought up rate to
10 bpm at 700 psi. Worked pipe 15' while circulating and condtioning
hole for cement. Up weight 255K down weight 135K.
17:00 - 21:00 4.00 CASE SURF Rigged up Dowell. Held a PJSM. Pumped 5 bbls of water, test lines to
3000 psi and pumped additional 5 bbls of water. Mixed and pumped 75
bbls of B45 viscosified spacer at 10.4 ppg. Dropped top plug. Mixed and
pumped lead slurry of 825 sxs (652 bbls) of Artic Set 3 +30% D053
thixotrop + .696% D046 antifoam + 1.5% D079 extender + 1.5% S001
accelerator + 50% D124 extender + 9% D044 accelerator mixed in a
' 10.8 ppg slurry with a yield of 4.44 ft3/sx. Followed with tail slurry 290
sxs (60 bbls) Class G + .2% D046 antifoam + .3% D065 Dispersant +
.4% D167 fluid loss + .5% S001 accelerator. Mixed in a 15.8 ppg slurry
with a yield of 1.16 ft3/sk. Dropped bottom plug and displaced with rig
pumps at 10 bpm. Bumped plug with 2500 psi at 2030 hrs. Released
pressure and float held. Flush riser and flowline with water. Laid down
cement head and landing joint.
21:00 - 21:30 0.50 CASE SURF Laid down casing tong, elevators, casing bails and picked up drilling
bails.
21:30 - 23:30 2.00 CASE SURF Nipple down diverter system.
23:30 - 00:00 0.50 WHSUR SURF Nippled up FMC Gert 5A wellhead system with spacer spool and
crossover spool. Tested metal to metal seal to 1000 psi for 10 minutes.
9/1/2000 00:00 - 00:30 0.50 WHSUR SURF Finished nippling up 11" FMC Gen 5A wellhead and tested metal to
Printed: 9/1912000 4:11:44 PM
BP AMOCO NOV ~. 8 ~000 Page 3 of 6
Operations Summary Repor Comm!,_.lon
Legal Well Name: MPF-82i
Common Well Name: MPF-82 Spud Date: 8~27~2000
Event Name: DRILL+COMPLETE Start: 8~26~2000 End: 9~7~2000
Contractor Name: DOYON Rig Release: 9~7~2000 Group: RIG
Rig Name: DOYON 141 Rig Number:
Date From - To Hours Activity Code Phase Description of Operations
9/1/2000 00:00 - 00:30 0.50 WHSUR SURF metal seals to 1000 psi for 10 minutes.
00:30 - 03:00 2.50 BOPSUF SURF Nippled up 13-5/8" 5000 psi BOPE.
03:00 - 07:00 4.00 BOPSUF SURF Pressure tested all rams and valves to 250 psi Iow / and 3000 psi high.
All Iow pressure tests held 5 minutes and high pressure test held 10
minutes. All tests recorded on chart. Right to witness test waived by
AOGCC Inspector, Jeff Jones.
07:00 - 07:30 0.50 WHSUR SURF Installed wear bushing. 9" ID.
07:30 - 08:00 0.50 DRILL SURF Service rig and top drive.
08:00 - 10:30 2.50 DRILL SURF Picked up 8-1/2" Sec. FM2653 PDC bit, motor set at 17, pony collar,
stab. and MWD. Orient MWD. Finished picking up float sub, 3 flex
collars, drilling jar and 6 HWDP.
10:30 - 14:30 4.00 DRILL SURF Singled in 150 joints of 5" drill pipe from pipe shed. Tagged cement at
5211'.
14:30 - 15:00 0.50 DRILL SURF Made up top drive and broke circulation. Circulated air out of hole.
15:00 - 18:00 1.00 DRILL SURF Tested casing to 3500 psi for 30 minutes. Recorded test on chart.
18:00 - 17:30 1.50 DRILL PROD1 Drilled plugs, float collar, shoe tract and float shoe. Cleaned out rathole
to 5325'. Drill 30' of new hole to 5355'.
17:30 - 18:30 1.00 DRILL PROD1 Displaced water in hole with new 8.5 ppg mud. Circulated and
conditioned mud for FIT.
18:30 - 19:00 0.50 DRILL PROD1 Conducted FIT. Pulled into shoe. Closed top rams. Pressured up to 670
psi on well. Mud weight 8.5 ppg, TVD of shoe 4265'. Equivalent mud
weight 11.5 ppg. Held pressure 15 minutes and pressure bled to 620
psi. Bled off pressure and opened rams.
19:00 - 00:00 5.00 DRILL PROD1 Directional drill from 5355'-5844'. Maintainng 45? tangent section. ART
3.58 hrs AST .35 hrs. ROP 124'/hr. Drill with 504 gpm at 1320 psi, 8/12
K WOB and 8-10,000 ftlbs rotary torque at 90 RPM.
9/2/2000 00:00 - 07:00 7.00 DRILL PROD1 Directionally drill from 5844'-6500'. Maintaining 45? tangent section
ART4.39 hrs AST .95 hr. ROP 126'/hr. Drilling with 504 gpm at 1400
psi, 8-10K WOB, 20000 ftlbs with 90 RPM. ECD increasing to 10.4
. EMW.
07:00 - 08:00 1.00 DRILL PROD1 Pumped high vis sweep and circulated around. Sweep brought out
significant amount of cuttings. ECD decreased to 10.1 ppg EMW.
;08:00 - 09:30 1.50 DRILL PROD1 Make a wiper trip from 8500' to shoe at 5311'. Average overpull of
10-20K on trip out of hole. Hole took good mud. No problems running
back to bottom.
Printed: 9119/2000 4:11:44 PM
t:CEIVEg
BP AMOCO age 4 of 6
Operations Summary Repo NOV 000
011 & ~ r,,,...
Legal Well Name: MPF-82i ,t~nCh~"~g; Cuml~ission
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: DRILL+COMPLETE Start: 8~26~2000 End: 9/7/2000
Contractor Name: DOYON Rig Release: 9~7~2000 Group: RIG
Rig Name: DOYON 141 Rig Number:
Date From - To Hours Activity Code Phase Description of Operations
9/2/2000 09:30 - 00:00 14.50 DRILL PROD1 Directional drill from 6500'-7600' maintaining 45? tangent section. ART
11.0 hrs AST 2.57 hrs. ROP 103'/hr, Drilling with 504 gpm at 1610 psi,
8-12K WOB and 10-13,000 fflbs at 70 rotary. ECD 10.1 ppg EMW.
9~3~2000 00:00 - 05:00 5.00 DRILL PROD1 Directional drill from 7600'-8011' maintaining 45? tangent section. ART
2.83 hrs AST 1.00 hrs. ROP 126 '/hr. 504 gpm at 1800 psi, 8-12K
WOB, 12-15000 fflbs of torque at 90 RPM. ECD increased to 10.4 ppg
EMW.
05:00 - 06:30 1.50 DRILL PROD1 Pumped high vis sweep and circulated hole clean. Rotated and
reciprocated pipe while circulating. Did not have increase in cuttings
with sweep.
06:30 - 08:00 1.50 DRILL PROD1 Observe well. Slug pipe and pulled out of hole to shoe at 5311'. Very
good trip out of hole. Max overpull 5-10K. Hole took proper fill.
08:00 - 09:00 1.00 DRILL PROD1 Cut and slip drill line. Serviced topdrive.
09:00 - 10:00 1.00 DRILL PROD1 Tripped back in hole to 7918'. As a precaution washed from
7918'-8011'. No problems. Hole in good shape.
10:00 - 00:00 14.00 DRILL PROD1 Directional drill from 8011'-8813'. Maintaining 45? tangent section to
8200'. Began dropping angle at 8200' at 3? per hundred. ART 5.82 hrs
AST 5.16 hrs. Average ROP 73'/hr. 500 gpm at 1900 psi, 8-12K WOB,
23000 ftlbs torque at 85 RPM.
ECD reading 10.4-10.6 EMW.
9/4/2000 00:00 - 09:00 9.00 DRILL PROD1 Directional drill from 8813'-9440' dropping angle at 3? per hundred.
ART 6.15 Hrs AST 0 Hrs. Average ROP 101'/hr. 500 gpm at 1900 psi,
8-12,000 WOB, 20000 ftlbs at 85 RPM. ECD 10.6 EMW.
09:00 - 10:30 1.50 DRILL PROD1 Pumped a weighted barafibre high vis sweep and circulated around.
Not much cutting with sweep. Hole clean.
10:30 - 14:00 3.50 DRILL PROD1 Observe well. Took slow pump rates. Pumped slug and made wiper trip
to shoe at 5311'. Recorded PU, SO and torque while pulling out of hole.
Good hole. Tripped back to bottom with no problems.
14:00 - 16:00 2.00 DRILL PROD1 Pumped 30 bbl weighted barafibre high vis sweep and circulated
around. Treated mud for casing job.
16:00 - 19:30 3.50 DRILL PROD1 Observed well. Dropped Sperry ESS tool. Pumped slug and pulled out
of hole with 5" drill pipe.
19:30 - 21:00 1.50 DRILL PROD1 Pulled out of hole laying down BHA. Downloaded MWD. Set adjustable
motor to 17. Laid down MWD and motor.
21:00 - 22:30 1.50 BOPSUI; PROD1 Pulled wear bushing. Installed test plug. Remove VBR and installed 7"
i casing rams in top. Tested doors to 3000 psi.
Pulled test plug.
22:30 - 00:00 1.50 CASE PROD1 Rigged up fill up tool, casing elevator, casing slips and casing tongs.
Held PJSM on running casing.
Printed: 911912000 4:11:44 PM
A OCO £C£1
Operations Summary Report 01/ 8
'a. la~n n. . ~000
- ",, e ~as Cons
Legal Well Name: MPF-82i
Common Well Name: MPF-82 Sp~uC~': C8/t~/:~
I Event Name: DRILL+COMPLETE Start: 8/26/2000 End: 9/7/2000
Contractor Name: DOYON Rig Release: 9/7/2000 Group: RIG
Rig Name: DOYON 141 Rig Number:
Date From - To Hours Activity Code Phase Description of Operations
'9/5/2000 00:00 - 08:00 8.00 CASE COMP Made up float equipment and ran in hole with 232 jts of 7" 26# L-80
BTM casing filling every joint. Bakerlocked first 3 joints and installed
centralizers on first 25 jts of casing. Make up torque 8500 fflbs. Made
up mandrell hanger & landing joint and landed casing at 9425'. Rigged
up cementing head and cementing lines.
08:00 - 12:00 4.00 CEMT COMP ~ Broke circulation at 2 bpm and slowly stage up pumps to 6 bpm.
Reciprocated pipe with 10' strokes while circulating and conditioning for
cement job.
12:00 - 13:00 1.00 CEMT COMP Rigged up Dowell and installed plugs in cementing head. Held P JaM on
cementing job. Pumped 5 bbls water ahead and tested lines to 3000
psi. Pumed 50 bbls of B-45 spacer weighted to 10.6 ppg. Dropped
bottom plug and pumped 180 sxs (37 bbls) class G +.02% D046
antifoam + .3% D065 dispersant + .11% D800 retarder + .4% D167 fluid
loss mixed in at 15.8 ppg slurry with a yield of 1.16 ft3. Flushed lines
and kicked out top plug with 5 bbls of water.
13:00 - 14:00 1.00 CEMT COMP Displaced cement with rig pumps at 6 bpm. Slowed pumps to 3 bpm
and bumped plug at 1347 hrs with 2500 psi. Had full returns during
cementing. Reciprocated pipe in 10' strokes. Bled off pressure and
floats operated properly.
14:00 - 14:30 0.50 CEMT COMP lay down cement head & Landing it.
14:30 - 15:30 1.00 WHSUR COMP Install 7" mandrell hanger pack-off- Clear rig floor of casing tools
15:30 - 17:30 2.00 BOPSUF COMP Remove 7" casing rams & install 3? x 6" variable in top and 3? pipe
rams in bottom
17:30 - 19:00 1.50 WHSUR COMP Pre-Job safety meeting - Set Back Bop stack
19:00 - 21:00 2.00~ WHSUR COMP Nipple down and Remove 11" 5K drilling spool - Nipple up FMC 11" x 7
1/16 5000# Gen 5a tubing head - test pack-off to 5000 psi for 15
minutes - ok
21:00 - 23:00 2.00 WHSUR COMP Nipple up 7 1/16 x 13 5/8 5000~ DSA & 13 5/8 BOP stack- Install
flowline
23:00 - 23:30 0.50 WHSUR COMP Install test plug - Test top and bottom rams to 250 & 3000 psi
23:30 - 00:00 0.50 RIGD COMP lay down 5" drill pipe out of derrick
9/6/2000 00:00 - 06:00 6.00 RIGD COMP Finished laying down 5" drill pipe from derrick.
06:00 - 11:00 5.00 BOPSUI; COMP Tested all rams and valves to 250 Iow for 5 minutes and 3000 psi high
for 10 minutes. All test recorded on chart. Function tested accumulator.
Right to witness test waived by AOGCC Inspector, John Spaulding.
11:00 - 16:00 5.00 EVAL COMP Rigged up Schlumberger. Ran in hole with 6.02" gauge ring and junk
basket to 9327' WLM (Float Collar 9340'). Pulled out of hole and laid
out gauge ring and junk basket.
RIH w/USIT cement evaluation tool - Log 9260 to 7500' - Top cement
8300' - good cement bond - PJD Schlumberger
Schlumberger wireline marked for depth control
16:00 - 16:30 0.50 EVAL COMP ;Close blind rams - Pressure test 7" casing to 3500 psi for 30 minutes
-ok
16:30 - 17:00 0.50 RUNCOI~ COMP Rig up Doyon 3? tubing tongs & handling tools
17:00 - 17:30 0.50 RUNCOI~ ~COMP Pre-Job safety meeting with drill crew on running completion
17:30 - 00:00 6.50 RUNCOI~ COMP Make up tail pipe assembly & Baker 7 x 4?" S-3 permanent packer -
RIH with 3?" 9.2# L-80 NSCT tubing - ? 6000' in hole at 00:00 hrs
Printed: 9119/2000 4:11:44 PM
.p AUOCO £ CE IV~)age 6 of 6
Operations Summary Repoli , $ ;2000
0i1~ ~ ~_
~-~ ~u~s. C~m~- .
Legal Well Name: MPF-82i ~nC~or~e
Common Well Name: MPF-82 Spud Date: 8/27/2000
Event Name: DRILL+COMPLETE StaA: 8~26~2000 End: 9/7/2000
Contractor Name: DOYON Rig Release: 9/7/2000 Group: RIG
Rig Name: DOYON 141 Rig Number:
Date From - To Houm Activity Code Phase Description of Operations
9~/2000 00:00 - 03:00 3.00 RUNCO~i COMP Finished running in hole with 299 jts of 3-1/2" 9.2~ L-80 NSCT tubing.
Torque 2900 fflbs. Up weight 115K Slack off weight 85K Block weight
40K.
03:00 - 03:30 0.50 RUNCO~] COMP Made up tubing hanger with ~C installed (4" LH Acme and BPV
Profile 2?" CIW Type H) and landed tubing. Run in lock down screws.
Tested ~C from the boffom to 1000 psi-OK.
03:30 - 05:00 1.50 BOPSUF COMP Nipple down BOP stack.
05:00 - 06:00 1.00 WHSUR COMP Nipple up FMC 7-1/16" X 3-1/8" 500~ tubing head adapter. Nipple up
CIW 3-118" 500~ tree. - Test Pack-off to 5000 psi - Test tree to 5000
psi
06:00 - 11:30 5.50 CHEM COMP Rig up lines - Cimulate 175 seawater treated w/25 gal / 100 bbls with
Comxit inhibitor down annulus at 1.5 bbllmin followed by 85 bbls of
diesel - Allow Diesel to U-Tube to tubing side for freeze pmte~ion to
2200' ~D
11:30 - 14:30 3.00 DHEQP COMP Drop 1 5/16" ball & Let fall to RHC plug - Pressure up with HB&R hot oil
unit to 4800 psi set packer and test tubing for 30 minutes - Test annulus
to 2500 psi for 30 minutes for MIT test - Lost 110 psi in 30 minutes -
Test witness by Mr. John Crisp of AOGCC
14:30 - 15:30 1.00 CHEM COMP Rig up and Pump 65 bbls Diesel down 9 5/8 x 7" annulus for freeze
pmte~ion
15:30 - 18:00 2,50 WHSUR COMP Install 2?" type 'H' BPV - Install blind flange on wing valve - Secure well
- blow down lines - Clean out ~llar - Rig Released at 1800 h= 917100
Printed: 9119/2000 4:11:44 PM
MILNE POINT, ALASKA
TO: Bixby /
FROM: O'Malle¥ Mark
Main Category: Drill
Sub Category: Perf Initial
Sub Category: E-Line
Operation Date: 10 / 22 / 00
Date: IlO / 22 / O0 I
Objective: Perforate F-821 Kuparuk "A" sands as per program from town,
Operation: SWS arrived location, Held pro-job safety meeting, RU to the well head and pressure
Tested the lubricator to 2,500 psi. RIH with first 20' 2" HSD Power jet gun ( 6spf 60
deg. Phasing ) RIH with Gun #1 with a gamma ray to perforation intervals tied into UCl
log 9/6/00 performed a correlation pass and logged the jewelry, 6.6" from CCL to the
top shot spotted CCL @ 9,229.4' 20' interval 9,236' - 9,256' gun fired, logged off POH
all shots fired. RIH with Gun #2 20' logged into position 6.6" from CCL to top shot
spotted CCL at 9197.4' 20' interval from 9,204' - 9,224' gun fired, logged off POH all
shots fired. RIH with Gun #3 20' logged into position 6.6" CCL to top shot, spotted
CCL at 9,173.4' 20' interval from 9,180' - 9,200' No indication on surface that gun fired
POH gun did not fire short in the tools string, Re-ran Gun and position into place CCL
at 9,173.4 interval from 9,180' - 9,200' gun fired, POH all shots fired.
RD SWS
Conclusion: Well perforated three intervals of 20' as per program. 9,180'-9,200' / 9,204'-9224'/
9,236'-9,256'
AFE # 337194 9335 -070 -780 Drlg / Perf Initial/E-Line SWS = $18,000
RECEIVED
NOV tO00
Oil & Gas Co~s. Commission
AnChorage
North Slope Alaska
Alaska State Plane 4
Miine Point MPF
MPF-82 MWD
Surveyed: 4 September, 2000
SURVEY 'REPORT
18 September, 2000
Your Ref: 500292297100
Surface Coordinates: 6035441.68 N, 541552.06 E (70° 30' 27.8959" N,
Kelly Bushing: 42.15ft above Mean Sea Level
149° 39' 36.1141" W)
Survey Ref: svy9561
Sperry-Sun Drilling Services
Survey Report for MPF-82 MWD
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
2150.62 33.900 248.630 1992.59
2234.00 36.476 249.108 2060.73
2241.26 36.700 249.150 2066.56
2335.30 41.900 246.690 2139.31
2428.64 44.900 246.260 2207.12
2521.88 48.440 241.140 2271.11
2614.24 48.650 236.860 2332.27
2707.89 49.910 238.070 2393.37
2800.39 52.980 237.110 2451.01
2894.52 51.140 232.190 2508.91
2985.37 48.030 229.640 2567.80
3078.67 46.410 228.640 2631.17
3171.82 43.550 229.890 2697.06
3264.89 41.620 231.350 2765.58
3358.15 39.330 231.630 2836.52
3450.60 40.040 231.990 2907.66
3543.54 42.250 232.840 2977.65
3636.33 45.020 231.540 3044.80
3728.44 44.990 232.130 3109.93
3820.63 42.930 235.180 3176.29
3914.24 43.440 235.290 3244.55
4007.37 45.580 234.870 3310.95
4101.28 46.940 235.780 3375.88
4193.82 47.400 236.120 3438.79
4285.06 45.480 235.110 3501.67
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northlngs Eastings
(ft) (ft) (ft) (ft) (~t)
2034.74 108.73 S 514.60 W '6035330.07 N 541038.08 E
2102.88 126.05 S 559.41 W 6035312.51 N 540993.36 E
2108.71 127.59 S 563.46 W 6035310.94 N 540989.33 E
2181.46 150.03 S 618.60 W 6035288.19 N 540934.31 E
2249.27 175.63 $ 677.39 W 6035262.26 N 540875.66 E
2313.26 205.74 S 738.10 W 6035231.81 N 540815.12 E
2374.42 241.38 S 797.41 W 6035195.84 N 540756.01 E
2435.52 279.54 $ 857.25 W 6035157.34 N 540696.39 E
2493.16 318.32 S 918.30 W 6035118.23 N 540635.55 E
2551.06 361.21 S 978.54 W 6035075.00 N 540575.26 E
2609.95 404.78 S 1032.54 W 6035031.13 N 540521.80 E
2673.32 449.58 S 1084.33 W 6034986.05 N 540470.26 E
2739.21 492.55 S 1134.21 W 6034942.79 N 540420.63 E
2807.73 532.51 S 1182.87 W 6034902.56 N 540372.19 E
2878.67 570.21 S 1230.23 W 6034864.60 N 540325.03 E
2949.81 606.71 S 1276.64 W 6034827.84 N 540278.84 E
3019.80 643.99 S 1325.10 W 6034790.28 N 540230.59 E
3086.95 683.26 S 1375.67 W 6034750.74 N 540180.24 E
3152.08 723.51 S 1426.88 W 6034710.20 N 540129.25 E
3218.44 761.45 S 1478.39 W 6034671.98 N 540077.95 E
3286.70 797.98 S 1531.02 W 6034635.15 N 540025.53 E
3353.10 835.35 S 1554.54 W 6034597.48 N 539972.21 E
3418.63 873.94 S 1640.34 W 6034558.57 N 539916.63 E
3480.94 911.94 $ 1696.57 W 6034520.26 N 539860.61 E
3543.82 949.27 $ 1751.14 W 6034482.63 N 539806.26 E
Dogleg
Rate
(°/lOOft)
3.107
3.108
5.772
3.23O
5.509
3.480
1.664
3.417
4.561
4.035
1.906
3.213
2.330
2.463
0.807
2.453
3.138
0.454
3.204
0.551
2.320
1.609
0.565
2.252
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
Comment
495.o5 Tle-onSuwev
MWD Magnetic
542.28 Window Point
546.53
605.24
668.72
736.20
805.39
876.35
948.67
1022.72
1091.29
1158.89
1223.90
1286.30
1346.41 ~'
1405.06 C~
1465.88 ~ O
1529.53
1594.25
1658.01
1721.98
1787.16 ;~ ~:~
1854.91
1922.72
1988.76
Continued...
DrlllQueet 1.05.04e
18 September, 2000 - 15:16 .2 -
Sperry-Sun Drilling Services
Survey RePort for MPF.82 MWD
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured
Depth
(n)
Incl.
Azim.
Sub-Sea
Depth
(fi)
4378.52 45.880 235.050 3566.96
4472,05 47.570 235.870 3631.08
4563.96 46.480 235.090 3693.73
4657.57 46.080 235.880 3758.43
4750.96 47.030 236.460 3822.65
4844.32 46.130 237.160 3886.82
4936.69 47.140 237.480 3950.24
5027.48 44.980 236.480 4013.24
5122.36 44.590 237.370 4080.58
5213.03 45.150 238.250 4144.84
5272.44 45.350 239.040 4186.66
5329.91 45.810 239.910 4226.89
5422.17 47.270 238.910 4290.35
5516.81 47.080 237.470 4354.68
5609.28 46.700 237.080 4417.88
5702.80 45.970 236.380 4482.45
5794.81 45.350 235.290 4546.76
5887.99 45.090 233.880 4612.39
5978.23 45.300 236.280 4675.99
6071.72 44.750 235.420 4742.07
6165.39 44.980 236.210 4808.46
6259.36 45.810 237.610 4874.45
6349.37 45.880 237.380 4937.15
6443.30 45.750 237.110 5002.61
6536.68 46.910 237.560 5067.09
Vertical Local Coordinates"
Depth Northings Easflngs
(fi) (ft) (ft)
3609.11 987.55 S 1805.97 W
3673.23 1026.15 S 1862.06 W
3735.88 1064.25 $ 1917.47 W
3800.58 1102.59 S 1973.21 W
3664.80 1140.33 S 2029.53 W
3926.97 1177.46 S 2086.28 W
3992.39 1213.71 S 2142.80 W
4055.39 1249.33 S 2197.62 W
4122.73 1285.80 S 2253.62 W
4186.99 1319.88 S 2307.76 W
4228.81 1341.83 S 2343.79 W
4269.04 1362.68 S 2379.15 W
4332.50 1396.76 $ 2436.79 W
4396.83 1433.35 S 2495.77 W
4460.03 1469.84 S 2552.56 W
4524.60 1506.95 S 2609.13 W
4588.91 1543.90 $ 2663.58 W
4654.54 1562.23 S 2717.46 W
4718.14 1618.87 S 2769.97 W
4784.22 1655.99 S 2824.70 W
4850.61 1693.12 S 2879.36 W
4916.60 1729.64 S 2935.42 W
4979.30 1764.34 S 2989.88 W
5044.76 1800.78 S 3046.52 W
5109.24 1837.24 $ 3103.39 W
Global Coordinates
Northings Eastings
(ft) (ft)
6034444.05 N 539751.65 E
6034405.13 N 539695.77 E
6034366.72 N 539640.58 E
6034328.07 N 539565.05 E
6034290.01 N 539528.94 E
6034252.57 N 539472.40 E
- 6034216.00 N 539416.08 E
6034180.08 N 539361.46 E
6034143.29 N 539305.66 E
6034108.91 N 539251.72 E
6034086.76 N 539215.81 E
6034065.72 N 539180.57 E
6034031.31 N 539123.12 E
6033994.40 N 539064.34 E
6033957.59 N 539007.76 E
6033920.16 N 538951.40 E
6033882.90 N 538897.16 E
6033844.28 N 538843.47 E
6033807.34 N 538791.19 E
6033769.91 N 538736.66 E
6033732.48 N 538682.21 E
6033695.65 N 538626.36 E
6033660.64 N 538572.10 E
6033623.88 N 538515.66 E
6033587.11 N 538459.00 E
Dogleg
Rate
(°/lOOft)
0.430
1.916
1.339
0.745
1.113
1.107
1.122
2.508
0.778
0.922
1.003
1.345
1.767
1.134
0.513
0.950
1.083
1.110
1.901
0.877
0.644
1.380
0.199
0.248
1.290
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
Comment
2055.52
2123.52
2190.69
2258.26
2326.01
2393.80
2460.94
2526.29
2593.11
2657.07
2699.26
2740.30
2807.25
2876.66
2944.15
3011.78
3077.52
3143.51
3207.43
3273.50
3339.52
3406.39
3470.97
3536.31
3605.84
Continued...
18 September, 2000 - 15:16 - 3 - DrlllOueet 1.05,04e
Sperry-Sun Drilling Services
Survey Report for MPF-82 MWD
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Fastings Northings Eastings
(ft) (fi) (ft) (ft) (fi)
6630.68 45.630 237.140 5132.07 5174.22
6723.83 45.060 236.440 5197.54 5239.69
6817.45 44.140 235.820 5264.20 5306.35
6909.57 44.250 235.650 5330.25 5372.40
7002.69 44.420 236.070 5396.85 5439.00
7095.42 44.950 236.070 5462.78 5504.93
7185.82 47.060 235.600 5525.57 5567.72
7279.25 47.080 234.990 5589.21 5631.36
7372.72 46.260 235.320 5653.34 5695.49
7465.55 46.880 235.510 5717.16 5759.31
7557.58 46.740 236.140 5780.15 5622.30
7651.96 46.020 236.140 5845.26 5887.41
7742.21 45.910 235.940 5907.99 5950.14
7835.34 46.320 235.970 5972.55 6014.70
7927.12 47.900 236.090 6035.01 6077.16
8022.32 48.060 237.040 6098.74 6140.89
8115.04 46.460 236.900 6161.66 6203.81
8208.11 44.930 237.480 6226.67 6268.82
8302.82 41.780 236.040 6295.53 6337.68
8396.00 38.770 235.650 6366.61 6408.76
8488.61 35.400 235.790 6440.48 6482.63
8581.35 32.450 235.850 6517.42 6559.57
8671.19 29.640 237.170 6594.39 6636.54
8764.09 29.010 237.100 6675.38 6717.53
8856.09 28.000 236.710 6756.23 6798.38
1873.88 S 3160.58W 6033550.15 N 538402.01 E
1910.17 S 3216.02W 6033513.55 N 536346.78E
1948.80 S 3270~60W 6033476.62 N 538292.40E
1982.96 S 3323.67W 6033440.16 N 538239.53 E
2019.48 S 3377.53W 6033403.34N 538185.88 E
2055.88 S 3431.64W 6033366.64 N 538131.98 E
2092.40 S 3485.44W -6033329.82 N 538078.38 E
2131.35 S 3541.68W 6033290.56 N 538022.36 E
2170.20 S 3597.48W 6033251.40 N 537966.78 E
2208.46S 3652.98W 6033212.82 N 537911.49 E
2246.15 S 3708.49W 6033174.82 N 537856.19 E
2284.22 S 3765.23W 6033136.44 N 537799.67E
2320.46 S 3819.04W 6033099.89 N 537746.06 E
2358.04 S 3874.66W 6033062.00 N 537690.65 E
2395.61 S 3930.43 W 6033024.12 N 537635.10 E
2434.58 $ 3989.45 W 6032984.82 N 537576.30 E
2471.70 S 4046.54 W 6032947.39 N 537519.41 E
2507.79 S 4102.51W 6032910.98 N 537463.64E
2543.40 S 4156.89W 6032875.07N 537409.46 E
2577.21S 4206.74W 6032840.98 N 537359.80 E
2608.66 S 4252.87W 6032809.27 N 537313.84 E
2637.74 S 4295.69W 6032779.96 N 537271.19 E
2663.32 $ 4334.31W 6032754.16 N 537232.72 E
2688.01S 4372.53W 6032729.26 N 537194.64 E
2711.98 S 4409.31W 6032705.08 N 537157.99 E
Dogleg
Rate
(°llOOfl)
1.399
0.813
1.087
0.176
0.364
0.572
2.364
0.479
0.914
0.684
0.522
0.763
0.201
0.441
1.724
0.760
1.729
1.703
3.486
3.242
3.640
3.181
3.218
0.679
1.116
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
3673.76
3739.99
3805.68
3869.83
3934.85
4000.01
4064.97
4133.29
4201.17
4268.50
4335.53
4403.81
4468.64
4535.70
4602.89
4673.58
4741.65
4808.24
4873.23
4933.40
4989.18
5040.88
5087.18
5132.67
5176.56
Comment
Continued...
18 September, 2000- 15:16 -4- DrlllQueet 1.05.04e
Sperry-Sun Drilling Services
Survey Report for MPF-82 MWD
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (fi)
Global Coordinates
Northings Eastings
(ft) (fi)
8949.31 27.100 236.570 6838.88 6881.03 2735.69 $ 4445.32 W
9042.57 26.440 236.940 6922.14 6964.29 2758.72 $ 4480.45 W
9133.15 25.560 236.250 7003.55 7045.70 2780.57 S 4513.60 W
9228.46 24.320 236.230 7089.98 7132.13 2802.91 S 4547.01 W
9321.15 22.910 237.470 7174.90 7217.05 2823.22 S 4578.09 W
9345.18 22.460 237.050 7197.07 7239.22 2828.23 S 4585.89W
9440.00 22.460 237.050 7284.70 7326.85 2847.93 S 4616.28W
6032681.17 N 537122.11E
6032657.95 N 537087.11E
6032635.90 N 537054.08 E
6032613.38 N 537020.80 E
6032592.90 N 536989.83 E
6032687.84 N 536982.06 E
- 6032567.97 N 536951.78 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to MPF-82, Northings and Eastings are relative to MPF-82.
Magnetic Declination at Surface is 26.546° (18-Sep-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from MPF-82 and calculated along an Azimuth of 238.328° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 9440.00ft.,
The Bottom Hole Displacement is 5424.1 Oft., in the Direction of 238.328° (True).
Dogleg
Rate
(o/looft)
0.968
0.730
1.027
1.301
1.613
1.990
0.000
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
Comment
5219.66
5261.65
5301.34
5341.50
5378.61
5387.88
5424.10
Projected Survey
Continued...
DrlllQueet 1.05.04e
18 September, 2000 - 15:16 - 5 -
Sperry-Sun Drilling Services
Survey Report for MPF-82 MWD
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (fi)
2150.62 2034.74 108.73 S 514.60 w
2234.00 2102.68 126.05 S 559.41 w
9440.00 7326.85 2847.93 S 4616.28 w
Comment
Tie-on Survey
Window Point
Projected Survey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
2150.62 2034.74
To
Measured Vertical
Depth Depth
(ft) (ft)
2150.62 2034.74
9440.00 7326.85
Survey Tool Description
AK-6 BP_IFR-AK
MWD Magnetic
18 September, 2000 - 15:16 - 6- DrillQueet 1.05.04e
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
MPF-82
Surveyed: 4 September, 2000
SURVEY REPORT
18 September, 2000
Your Ref: 500292297100
Surface Coordinates: 6035441.68 N, 541552.06 E (70° 30' 27.8959" N,
Kelly Bushing: 42.15fl above Mean Sea Level
' I-- N S lC::
149° 39' 36.1141" W)
Survey Ref: .vy9563
Sperry-Sun Drilling Services
Survey Report for MPF-82
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (fi) (ft) (ft)
2150.62 33.900 248.630 1992.59 2034.74
2234.00 36.476 248.584 2060.73 2102.88
2241.26 36,700 248.580 2066.56 2108.71
2335.30 41.900 245.990 2139.31 2181.46
2428.64 44.900 244.900 2207.12 2249.27
2521.88 48.440 241.530 2271.10 2313.25
2614.24 48.650 238.240 2332.25 2374.40
2707.89 49.910 238.140 2393.35 2435.50
2800.39 52.980 236.890 2450.99 2493.14
2894.52 51.140 233.490 2508.88 2551.03
2985.37 48.030 230,640 2567.78 2609.93
3078.67 46.410 230.030 2631.14 2673.29
3171.82 43.550 230.230 2697.03 2739.18
3264.89 41.620 231.290 2765.55 2807.70
3358.15 39.330 231.400 2836.49 2878.64
3450.60 40.040 231.850 2907.63 2949.78
3543.54 42.250 232.930 2977.62 3019.77
3636.33 45.020 231.820 3044.77 3086.92
3728.44 44,990 231.910 3109.89 3152.04
3820.63 42,930 234.680 3176.26 3218.41
3914.24 43.440 235.590 3244.51 3286.66
4007.37 45.580 235.090 3310.92 3353.07
4101.28 46.940 235.550 3375.85 3418.00
4193.82 47.400 236.030 3438.76 3480.91
4285.06 45.480 235.300 3501.63 3543.78
108.73S 514.60W 6035330.07N 541038.08 E
126.26 S 559.33W 6035312.30 N 540993.44E
127.84S 563.36W 6035310.69 N 540989.43E
150.90 S 618.24W 6035287.33 N 540934.67 E
177.56 S 676.56W 6035260.34 N 540876.50 E
'208,16 S 737.06W 6035229.40 N 540816.18 E
242,89 S 796.92W .6035194.34 N 540756.51 E
280.30S 857.23W 6035156.59 N 540696.41 E
319.16 S 918.23W 6035117.39 N 540635.63 E
361,50 S 979.18W 6035074.71N 540574.92 E
403,98 S 1033.74W 6035031.93 N 540520.59 E
447.68 S 1086.46 W 6034987~3 N 540468.12 E
489.89 S 1136.99 W 6034945.44 N 540417.83 E
529,73 S 1185.75 W 6034905.32 N 540369.29 E
567.55 S 1233.02W 6034867.25 N 540322.23 E
604.19 S 1279.31W 6034830.34 N 540276.15 E
641.50 S 1327.75W 6034792.76 N 540227.92E
680.60 S 1378.45W 6034753.38 N 540177.44E
720.82S 1429.68W 6034712.87 N 540126.43E
759.08 S 1480.96W 6034674.33 N 540075.37E
795.70 S 1533.52W 6034637.41N 540023.01E
832.83 S 1587.22W 6034599.98 N 539969.53 E
871.43S 1643.01W 6034561.07 N 539913.95 E
909.59 S 1699.14W 6034522.60 N 539858.04E
946.87S 1753.73W 6034485.01N 539803.65 E
Dogleg
Rate
(°/100ft)
3.089
3.089
5.797
3.313
4.617
2.679
1.348
3.483
3.454
4.174
1.801
3.074
2.212
2.457
0,828
2.498
3.097
0.076
3.056
0.860
2.328
1.491
0.626
2.183
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
Comment
494.83 Tie-On Suwey
542.10 Window Point
546.36
605.16
668.78
736.33
805.51
876.48
948.80
1022.91
1091.66
1159.48
1224.66
1287.09
1347.18 .~.
1405.82
1466.65
1530.33 :t~---~
1595.06
1658.8o
1722.77
1787.96 o
1855.72
192~52
1989.57
Continued...
18 September, 2000 - 15:56 - 2 - DrlllQueet 1.05.04e
Sperry-Sun Drilling Services
Survey Report for MPF-82
Your Reft 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eaatings
(ft) (ft) (ft) (ft) fit)
4378.52 45.880 235.010 3566.93 3609.08
4472.05 47.570 236.130 3631.04 3673.19
4563.96 46.480 235.210 3693.70 3735.85
4657.57 46.080 236.300 3758.39 3800.54
'4750.96 47.030 236.720 3822.61 3864.76
4844.32 46.130 237.500 3886.78 3928.93
4936.69 47.140 237.900 3950.21 3992.36
5027.48 44.980 236.850 4013.21 4055.36
5122.36 44.590 237.200 4080.55 4122.70
5213.03 45.150 238.080 4144.81 4186.96
5272.44 45.350 238.750 4186.63 4228.78
5329.91 45.810 239.080 4226.86 4269.01
5422.17 47.270 238.300 4290.32 4332.47
5516.81 47.080 236.520 4354.65 4396.80
5609.28 46.700 236.020 4417.84 4459.99
5702.80 45.970 235.450 4482.41 4524.56
5794.81 45.350 234.170 4546.72 4588.87
5887.99 45.090 233.960 4612.36 4654.51
5978.23 45.300 235.130 4675.95 4718.10
6071.72 44.750 235.070 4742.03 4784.18
6165.39 44.980 236.540 4808.42 4850.57
6259.36 45.810 237.350 4874.41 4916.56
6349.37 45.880 237.390 4937.11 4979.26
6443.30 45.750 237.770 5002.58 5044.73
6536.68 46.910 237.470 5067.05 5109.20
985.08 S 1808.61W 6034446.50 N 539748.99 E
1023.57S 1864.78W 6034407.70 N 539693.04E
1061A9 $ 1920.31W 6034369.47N 539637.72 E
1099.56 $ 1976.23W 6034331.08 N 539582.01E
1136.97S 2032.78W 6034293.36 N 539525.67E
1173.80 S 2089.72W 6034256.21N 539468.94E
1209.68 S 2146.48W .6034220.02 N 539412.38 E
1244.91 $ 2201.54W 6034184.47N 539357.51E
1281.29 S 2257.61W 6034147.78 N 539301.65 E
1315.53 S 2311.65W 6034113.25 N 539247.81 E
1337.62S 2347.59W 6034090.95 N 539211.99 E
1358.82 S 2382.74 W 6034069.56 N 539176.96 E
1393.62 $ 2439.95 W 6034034.43 N 539119.94 E
1431.00 S 2498.43 W 6033996.73 N 539061.67 E
1468.49S 2554.57W 6033958.93 N 539005.74 E
1506.57S 2610.48W 6033920.53 N 538950.04E
1544.49 S 2664.26W 6033882.31N 538896.48E
1583.31S 2717.82W 6033843.20 N 538843.14 E
1620.44S 2769.97W 6033805.77 N 538791.20 E
1658.28 S 2824.21W 6033767.63 N 538737.17 E
1695.42S 2878.86W 6033730.19 N 538682.72 E
1731.91S 2934.94W 6033693.39 N 538626.85 E
1766.73S 2989.33W 6033658.26 N 538572.66 E
1802.84 S 3046.18W 6033621.83 N 538516.01E
1839.01S 3103.22W 6033585.34 N 538459.17 E
Dogleg
Rate
(°/lOOff)
0.482
2.006
1.394
0.944
1.068
1.139
1.138
2.521
0.486
0.922
0.869
0.899
1.697
1.394
0.570
0.896
1.202
0.322
0.949
0.590
1.134
1.076
0.084
0.321
1.264
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
Comment
2056.34
2124.35
2191.53
2259.12
2326.89
2394.68
2461.83
2527.19
2594.o2
2657.98
2700.17
2741.21
28o8.18
2877.58
2945.04
3012.63
3078.31
3144.27
3208.16
3274.20
3340.21
34o7.1o
3471.67
3539:02
3606.56
Continued...
18 September, 2000 - 15:56 - 3- DrlllOuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for MPF-82
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eaatings
(fi) (ft) (ft)
6630.68 45.630 236.900 5132.03 5174.18
6723.83 45.060 236.480 5197.50 5239.65
6817.45 44.140 235.620 5264.16 5306.31
6909.57 44.250 235.440 5330.21 5372.36
7002.69 44.420 235.790 5396.81 5438.96
7095.42 44.950 235.750 5462.74 5504.89
7185.82 47.060 235.280 5525.53 5567.68
7279.25 47.080 234.730 5589.17 5631.32
7372.72 46.260 235.120 5653.31 5695.46
7465.55 46.880 235.370 5717.12 5759.27
7557.58 46.740 235~980 5780.11 5822.26
7651.96 46.020 235.930 5845.22 5887.37
7742.21 45.910 235.850 5907.95 5950.10
7835.34 46.320 235.860 5972.51 6014.66
7927.12 47.900 235.900 6034.97 6077.12
8022.32 48.060 237.150 6098.70 6140.85
8115.04 46.460 237.510 6161.63- 6203.78
8208.11 44.930 236.980 6226.63 6268.78
8302.62 41.780 235.770 6295.49 6337.64
8396.00 38.770 235.470 6366.57 6408.72
8488.61 35.400 235.550 6440.44 6482.59
8581.35 32.450 235.610 6517.39 6559.54
8671.19 29.640 236.890 6594.35 6636.50
8764.09 29.010 236.400 6675.35 6717.50
8856.09 28.000 236.250 6756.19 6798.34
Global Coordinates
Northings Eastings
(ft) (ft)
1875.82 S 3160.31 W 6033548.22 N 538402.29 E
1912.21 $ 3215.69 W 6033511.52 N 538347.12 E
1948.91 S 3270.22 W 6033474.51 N 538292.80 E
1985.26 S 3323.16 W 6033437.87 N 538240.06 E
2022.01 S 3376.86 W 6033400.81 N 538186.56 E
2058.69 S 3430.78 W 6033363.83 N 538132.85 E
2095.51 S 3484.38 W 6033326.71 N 538079.46 E
2134.75 S 3540.42 W 6033287.16 N 538023.64 E
2173.82 S 3596.06 W 6033247.78 N 537968.22 E
2212.25 S 3651.45 W 6033209.04 N 537913.04 E
2250.08 S 3706.86 W 6033170.90 N 537857.64 E
2288.33 S 3763.47 W 6033132.33 N 537801.45 E
2324.72 S 3817.19 W 6033095.65 N 537747.93 E
2362.39 $ 3872.74 W 6033057.66 N 537692.59 E
2400.11 S 3928.41 W 6033019.63 N 537637.14 E
2439.12 S 3987.40 W 6032980.30 N 537578.36 E
2475.88 S 4044.72 W 6032943.22 N 537521.25 E
2511.91 S 4100.74 W 6032906.87 N 537465.44 E
2547.89 $ 4154.88 W 6032870.59 N 537411.50 E
2581.90 S 4204.59 W 6032836.30 N 537361.98 E
2613.52 S 4250.61 W 6032804.43 N 537316.13 E
2642.77 $ 4293.30 W 6032774.93 N 537273.61 E
2668.53 $ 4331.81 W 6032748.97 N 537235.25 E
2693.54 S 4369.81 W 6032723.74 N 537197.38 E
2717.88 S 4406.35 W 6032699.19 N 537160.98 E
Alaska State Plane 4
Milne Point MPF
Dogleg Vertical
Rate Section
(°/lOOft) (ft)
Comment
1.430 3674.47
0.691 3740.71
1.175 3806.39
0.181 3870.53
0.320 3935.54
0.572 4000.69
2.364 4065.64
0.432 4133.94
0.928 4201.82
0.696 4269.14
0.507 4336.17
0.764 4404.44
0.136 4469.26
0.440 4536.32
1.722 4603.51
0.990 4674.20
1.749 4742.28
1.694 4808.88
3.440 4873.85 go
3.237 4934.02
3.639 4989.79 ~ ~ (~C)
3.181 5041.48
3.213 5087.78
0.726 5133:26 :::,
1.101 5177.14 ~-~.
Continued...
18 September, 2000 - 15:56 - 4 - DrlllQueet 1,05,048
Sperry-Sun Drilling Services
Survey Report for MPF-82
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
Global Coordinates
Northings Eaatinga
(ft) (ft)
8949.31 27.100 236.440 6838.84 6880.99 2741.78 S 4442.24 W
9042.57 26.440 236.880 6922.11 6964.26 2764.87 $ 4477.33 W
9133.15 25.560 236.310 7003.52 7045.67 2786.73 S 4510.48 W
9228.46 24.320 236.490 7089.94 7132.09 2808.97 $ 4543.95 W
9321.15 22.910 .237.590 7174.86 7217.01 2829.17 $ 4575.10 W
9345.18 22.460 237.240 7197.03 7239.18 2834.17 S 4582.91 W
9440.00 22.460 237.240 7284.66 7326.81 2853.77 S 4613.37 W
6032675.10 N 537125.23 E
6032651.81 N 537090.27 E
6032629.77 N 537057.24 E
6032607.34 N 537023.89 E
6032586.96 N 536992.86 E
6032581.92 N 536985.08 E
6032562.15 N 538954.72 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to MPF-82. Northings and Eastings are relative to MPF-82.
Magnetic Declination at Surface is 26.546° (18-Sep-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from MPF-82 and calculated along an Azimuth of 238.260° (True).
Based upon' Minimum Curvature type calculations, at a Measured Depth of 9440.00ft.,
The Bottom Hole Displacement is 5424.68ft., in the Direction of 238.260° (True).
Dogleg
Rate.
(°/lOOft)
0.970
0.739
1.010
1.303
1.594
1.955
0.000
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
5220.23
5262.22
5301.91
5342.08
5379.20
5388.46
5424.68
Comment
Projected Survey
Continued...
18 September, 2000- 15:56 -5- DrlllOuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for MPF-82
Your Ref: 500292297100
Surveyed: 4 September, 2000
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
2150.62 2034.74 108.73 s 514.60 w
2234.00 2102.88 126.26 S 559.33 W
9440,00 7326.81 2853.77 S 4613.37 W
Comment
Tie-On Survey
Window Point
Projected Survey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
TO
Measured Vertical
Depth Depth
(fi) (~t)
9440.00 7326.81
Survey Tool Description
AK-6 BP_IFR-AK
DrillCluest 1.05.04e
18 September, 2000 - 15:56 - 6 -
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
MPF-82 PB1
SURVEY REPORT
18 September, 2000
Surface Coordinates: 6035441.68 N, 541552.06 E (70° 30' 27.8959" N,
Kelly Bushing: 42.15fl above Mean Sea Level
149° 39' 36.1141" W)
O. RI.LLINB
Survey Ref: svy9536
Sperry-Sun Drilling Services
Survey Report for MPF-82 PB1
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
0.00 0.000 0.000 -42.15
120.46 0.170 88.540 78.31
210.83 0.490 69.010 168.68
301.87 0.320 32.310 259.72
392.43 0.900 281.950 350.27
484.87 1.630 275.280 442.69
576.80 2,070 261.700 534.57
667.79 3.930 265.650 625.43
757.89 5,930 268.530 715.20
851.40 6.720 262.100 808.14
945.87 9.420 267.830 901.66
1039.18 12.270 269.620 993.30
1130.46 14.510 265,440 1082.09
1222.77 17.230 268.090 1170.88
1315.32 21.450 270.630 1258.19
1409.38 24.520 259.790 1344.81
1502.42 24.010 261.210 1429.63
1593.29 26.610 257.270 1511.77
1686.43 30.040 253.230 1593.76
1779.77 31.360 252.490 1674.02
1871.48 31,160 251.150 1752.41
1965.04 29.280 251.960 1833.25
2057.74 30.040 250.480 1913.81
2150.62 33.900 248.630 1992.59
2243.57 38.080 245.970 2067.78
2337.02 42.310 244.400 2139.15
2430.66 45.650 241.770 2206.53
2523.99 47.920 240,150 2270.43
2616.47 50.230 237.560 2331.02
2709.16 50,950 234,790 2389.87
Vertical Local Coordinates .
Depth Northings Eastings
(ft) (ft) (ft)
0.00 0.00 N 0.00 E
120.46 0.00 N 0,18 E
210.83 0.15 N 0,67E
301.87 0.50 N 1.17 E
392.42 0.86 N 0.61E
484.84 1.13 N 1.41W
576.72 1.01N 4.35W
667.58 0.54 N 9.09W
757.35 0.19 N 16.82W
850.29 0.69 S 27.07W
943.81 1.74 S 40.27W
1035.45 2.10 S 57.82W
1124.24 3.07 S 78.92W
1213.03 4.45 S 104.12W
1300.34 4.72 S 134.75W
1386.96 7.99 S 171.18W
1471.78 14.30 S 208.89W
1553.92 21.62 $ 247.02W
1635.91 32.94 $ 289.71W
1716.17 46.99 $ 335.24W
1794.56 61.84 S 380.45W
1875.40 76.75 S 425.12W
1955.96 91.52 $ 468.54W
2034.74 108,73S 514.60W
2109.93 129.86 S 564.94W
2181.30 155.20 $ 619.65W
2243.68 184.66 S 677.59W
2312.58 217.69 S 737.04W
2373.17 253.85 S 796.82W
2432.02 293.71S 856.30W
Global Coordinates
Northings Eastings
(~t) (ft)
6035441.68 N 541552,06
6035441.69 N 541552.24
6035441.83 N ,541552.73
6035442.19 N 541553.23
6035442.55 N 541552.67
6035442.81N 541550.65
6035442.67 N 541547.70
6035442.17 N 541542.97
6035441.77N 541535.24
6035440.84 N 541525.00
6035439.71N 541511.80
6035439.26 N 541494.25
6035438.17 N 541473.16
6035436.65 N 541447.97
6035436.21N 541417.34
6035432.73 N 541380.92
6035426.21N 541343.25
6035418.68 N 541305.16
6035407.12 N 541262.54
6035392.81N 541217.09
6035377.71N 541171.96
6035362.56 N 541127.38
6035347.54 N 541084.03
6035330.07 N 541038.08
6035308.66 N 540987.85
6035283.02 N 540933.29
6035253.23 N 540875.51
6035219.87N 540816.24
6035183.38 N 540756.67
6035143.18 N 540697.42
Dogleg
Rate
(°/lOOft)
0.141
0.370
0.331
1.165
0.804
0.672
2.056
2,236
1.133
2,979
3,075
2.672
3.049
4.648
5.547
0.833
3,408
4,217
1.471
0.789
2.056
1.139
4.287
4.800
4.654
4.065
2.741
3.273
2.436
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
Comment
0.0o
-o.16
-0.67
-1.27
-0.94
0.74
3.41
7.85
14.89
24.42
36.65
52.44
71.67
94.73
122.13
156.06
192.51
229.78
272.95
319.88
366.90
413.45
458.84
507.68
562.13
622:38
687.38
755.35
825.03
896.13
z
Continued...
18 September, 2000 - 14:03 - 2 - DrlflQueet 1.05,04e
Sperry-Sun Drilling Services
Survey Report for MPF-82 PB1
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(ft) (ft)
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(fi) (ft) (ft) (ft) (ft)
2801.13 52.040 235.550 2447.13 2489.28 334.81 $ 915.38 w
2894.41 52.780 231.340 2504.04 2546.19 378.83 $ 974.72 w
2987.08 54.050 232.050 2559.28 2601.43 424.95 $ 1033.11 w
3079.47 54.330 235.840 2613.35 2655.50 469.03 s 1093.67 w
3173.04 52.710 236.690 2668.98 2711.13 510.82 s 1156.23 w
3266.35 50.700 236.560 2726.80 2768.95 551.10 S 1217.38 w
3359.23 49.580 235.940 2786.33 2828.48 590.71 $ 1276.66 w
3452.32 48.560 235.480 2847.31 2889.46 630.33 s 1334.77 w
3544.44 46.930 233.640 2909.26 2951.41 669.85 $ 1390.32 w
3636.54 45.300 233.490 2973.10 3015.25 709.27 s 1443.73 w
3728.90 41.190 232.070 3040.37 3082.52 747.51 S 1494.12 w
3846.50 41.190 232.070 3128.86 3171.01 795.12 $ 1555.21 W
6035101.75 N 540638.57 E
6035057.40 N 540579.48 E
6035010.96 N 540521.34 E
6034966.54 N 540461.03 E
6034924.40 N 540398.71 E
6034883.78 N 540337.78 E
6034843.84 N 540278.72 E
6034803.90 N 540220.84 E
6034764.07 N 540165.51 E
6034724.35 N 540112.32 E
6034685.83 N 540062.15 E
6034637.88 N 540001.33 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to MPF-82. Northings and Eastings are relative to MPF-82.
Dogleg
Rate
(°/lOOft)
1.350
3.663
1.502
3.34O
1.879
2.157
1.310
1.158
2.306
1.774
4.573
0.000
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(fi)
Comment
967.45
lO4O.32
1113.31
1187.29
1262.02
1334.80
1405.62
1475.39
1542.84
1608.34
167o.61
1746.68
Projected Survey
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from MPF-82 and calculated along an Azimuth of 242.921 ° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 3846.50ft.,
The Bottom Hole Displacement is 1746.68ft., in the Direction of 242.921 ° (True).
0
DrlllQueet 1.05.04e
18 September, 2000 - 14:03 - 3 -
Sperry-Sun Drilling Services
Survey Report for MPF-82 PB 1
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
Comments
Measured
Depth
(ft)
3846.50
Station Coordinates
TVD Northings Eastings
(ft) (ft) (fi)
3171.01 795.12 s 1555.21 w
Comment
Projected Survey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
To
Measured Vertical
Depth Depth
(ft) (ft)
3846.50 3171.01
Survey Tool Description
AK-6 BP_IFR-AK
18 September, 2000 - 14:03 - 4 - DrfllQuest 1.05.04e
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
MPF-82 PB1 'MWD
Surveyed: 28 August, 2000
SURVEY REPORT
18 September, 2000
Your Ref: 500292297170
Surface Coordinates: 6035441.68 N, 541552.06 E (70° 30' 27.8959" N,
Kelly Bushing: 42.15fl above Mean Sea Level
149° 39' 36.1141" W)
Diq ~ S lqV r' ~,= Survey Ref: svy9551
Sperry-Sun Drilling Services
Survey Report for MPF-82 PB1 MWD
Your Ref: 500292297170
Surveyed: 28 August, 2000
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
0.00 0.000 0.000 -42.15
120.46 0.170 89.320 78.31
210.83 0.490 69.020 168.68
301.87 0.320 31.960 259.72
392.43 0.900 281.960 350.27
484.87 1.630 274.920 442.69
576.80 2.070 261.300 534.57
667.79 3.930 265.310 625.43
757.89 5.930 268.050 715.20
851.40 6.720 262.370 808.14
945.87 9.420 268.160 901.66
1039.18 12.270 269.810 993.30
1130.46 14.510 265.480 1082.09
1222.77 17.230 268.180 1170.88
1315.32 21.450 270.760 1258.19
1409.38 24.520 260.030 1344.81
1502.42 24.010 261.450 1429.63
1593.29 26.610 257.550 1511.77
1686.43 30.040 253.490 1593.76
1779.77 31.360 252.720 1674.01
1871.48 31.160 251.470 1752.41
1965.04 29.280 252.430 1833.25
2057.74 30.040 249.790 1913.81
2150.62 33.900 249.560 1992.59
2243.57 38.080 245.640 2067.79
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft)
0.00 0.00 N 0.00 E
120.46 0.00 N 0.18 E
210.83 0.14 N 0.67 E
301.87 0.50 N 1.17 E
392.42 0.86 N 0.61 E
484.84 1.12 N 1.41 W
576.72 0.98 N 4.35 W
667.58 0.48 N 9.09 W
757.35 0.07 N 16.82 W
850.29 0.82 S 27.07 W
943.81 1.80 S 40.28 W
1035.45 2.08 S 57.83 W
1124.24 3.02 S 78.93 W
1213.03 4.36 S 104.13 W
1300.34 4.57 S 134.76 W
1386.96 7.73 S 171.21 W
1471.78 13.88 S 208.94 W
1553.92 21.02 S 247.10 W
1635.91 32.15 S 289.84 W
1716.16 46.00 S 335.43 W
1794.56 60.63 S 380.72 W
1875.40 75.23 S 425.48 W
1955.96 90.09 S 468.87 W
2034.74 107.17 S 514.98 W
2109.94 128.06 S 565.41 W
Dogleg
Rate
(°/lOOft)
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
6035441.68 N 541552.06 E 0.00
6035441.68 N 541552.24 E 0.141 -0.16
6035441.83 N 541552.73 E 0.372 -0.66
6035442.18 N 541553.23 E 0.334 -1.27
6035442.54 N 541552.66 E 1.163 -0.94
6035442.79 N 541550.64 E 0.806 0.74
6035442.64 N 541547.70 E 0.673 3.42
6035442.11 N 541542.97 E 2.056 7.86
6035441.65 N 541535.24 E 2.234 14.92
6035440.71 N 541525.00 E 1.077 24.44
6035439.65 N 541511.80 E 2.981 36.63
6035439.27 N 541494.25 E 3.072 52.36
6035438.22 N 541473.15 E 2.687 71.55
6035436.74 N 541447.96 E 3.052 94.57
6035436.35 N 541417.33 E 4.651 121.90
6035433.00 N 541380.90 E 5.510 155.75
6035426.63 N 541343.20 E 0.833 192.11
6035419.28 N 541305.08 E 3.398 229.31
6035407.91 N 541262.40 E 4.222 272.40
6035393.80 N 541216.89 E 1.476 319.27
6035378.92 N 541171.69 E 0.740 366.23
6035364.07 N 541127.00 E 2.075 412.72
6035348.97 N 541083.70 E 1.630 458.09
6035331.63 N 541037.69 E 4.158 506.90
6035310.46 N 540987.38 E 5.133 561.30
Comment
Con#l?ued...
18 September, 2000.14:03 - 2 - DrlllQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for MPF-82 PB1 MWD
Your Ref: 500292297170
Surveyed: 28 August, 2000
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (fi)
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
2337.02 42.310 244.370 2139.16 2181.31 153.57 S 620.04 W 6035284.65 N 540932.88 E
2430.66 45.650 241.340 2206.54 2248.69 183.27 S 677.86 W 6035254.62 N 540875.23 E
2523.99 47.920 239.970 2270.44 2312.59 216.61 S 737.14 W 6035220.95 N 540816.15 E
2616.47 50.230 236.390 2331.03 2373.18 253.47 S 796.47 W 6035183.76 N 540757.02 E
2709.16 50.950 234.080 2389.88 2432.03 294.31 S 855.29 W 6035142.59 N 540698.43 E
2801.13 52.040 233.760 2447.14 2489.29 336.69 S 913.45 W 6035099.88 N 540640.50 E
2894.41 52.780 229.000 2504.06 2546.21 382.81 S 971.16 W - 6035053.44 N 540583.05 E
2987.08 54.050 232.340 2559.30 2601.45 429.95 S 1028.72 W 6035005.98 N 540525.76 E
3079.47 54.330 235.870 2613.37 2655.52 473.86 S 1089.40 W 6034961.73 N 540465.33 E
3173.04 52.710 235.970 2669.00 2711.15 516.02 S 1151.71 W 6034919.23 N 540403.25 E
3266.35 50.700 237.000 2726.82 2768.97 556.46 S 1212.76 W 6034878.44 N 540342.43 E
3359.23 49.580 236.090 2786.35 2828.50 595.76 $ 1272.24 W 6034838.81 N 540283.17 E
3452.32 48.560 235.350 2847.33 2889.48 635.37 $ 1330.36 W 6034798.88 N 540225.28 E
3544.44 46.930 233.660 2909.28 2951.43 674.94 $ 1385.87 W 6034759.00 N 540169.98 E
3636.54 45.300 233.530 2973.12 3015.27 714.34 S 1439.30 W 6034719.30 N 540116.78 E
3728.90 41.190 232.810 3040.39 3082.54 752.25 S 1489.94 W 6034681.11 N 540066.35 E
3846.50 41.190 232.810 3128.88 3171.03 799.06 S 1551.64 W 6034633.95 N 540004.92 E
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to MPF-82. Northings and Eastings are relative to MPF-82.
Magnetic Declination at Surface is 26.546° (18-Sep-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from MPF-82 and calculated' along an Azimuth of 242.753° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 3846.50ft.,
The Bottom Hole Displacement is 1745.30ft,, in the Direction of 242.753° (True).
Alaska State Plane 4
Milne Point MPF
Dogleg Vertical
Rate Section
(o/lOOft) (ft)
Comment
4.610 621.55
4.215 686.55
2.657 754.51
3.846 824.14
2.076 895.13
1.216 966.24
4.120 1038.67
3.202 1111.41
3.113 1185.47
1.733 1260.17
2.322 1332.96
1.421 1403.83
1.249 1473.63
2.230 1541.10
1.773 1606.64
4.482 1669.02
0.000 1745.30
Projected Survey
Continued...
18 September, 2000- 14:03 -3- DrlllQueet 1.05.04e
Sperry-Sun Drilling Services
Survey Report for MPF-82 PB1 MWD
Your Ref: $00292297170
Surveyed: 28 August, 2000.
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
Comments
Measured
Depth
(ft)
3846.50
Station Coordinates
TVD Northings Eastings
(ft) (ft) (fi)
3171.03 799.06 S 1551.64 W
Comment
Projected Survey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
To
Measured Vertical
Depth Depth
(fi) (ft)
3846.50 3171.03
Survey Tool Description
MWD Magnetic
18 September, 2000 - 14:03 - 4 - DrlllQueet 1.05.04e
GeoQuest
3940 Arctic Bird
Anchorage, AK 99503
ATTN: Sherrie
NO. 517
Company
Field:
Alaska Oil & Gas Cons Corem
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Milne Point (Cased Hole)
9/14/00
Well Job # Log Description Date BL Sepia Color
MPF-82 20376 USIT 000906 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-661
Date Delivered:
Schlumberger GeoQuest
3940 Arctic Blvd
Anchorage, AK
A1TN: Sherrie~
Received
MEMORANDUM
TO:
THRU:
FROM:
Dan Seamount
Commissioner
Blair Wondzell ~
P.I. Supervisor
John Crisp' Jo~,~ 4,.
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: September 7, 2000
SUBJECT: Mechanical Integrity Tests
BPX
F Pad
MPF-82i
Milne Point Unit
Milne Point Field
,NON- CONFIDENTIAL
Packer Depth Pretest Initial 15 Min. 30 Min.
WellI F-82i
2oo-~2s I~YP~'"i'II ® I~'v'°'l ~oo I Tubingl °1°1° Io
Notes:P'T'D'l , TypetestI P ITestpsil 1800 ICasingI 0 I 2S00 I 241°1 239°1 P/F
Notes:
WellI
P.T.D.I
Notes:
P.T.D.I
Notes:
ITyPeIni'I I ~.v.o. I I Tubing I I" I I I'nterva'l {
Type testIITest psil I Casing II I' I IP/FI ].
I Type'inj.I I ~-.v.o. I '1 ~u~,,~ I I I I I'nterva'! I
Type testII Test psiI I Casing II I, I ' IPIF I I
Notes:
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = SALT WATER INJ.
N -- NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
O= Other (describe in notes)
Test's Details
I traveled to BPX Milne Point Field to witness the initial MIT on wall MPF-82i. I witnessed the one hour tbg. pressure
test performed to 4800 psi.
.I.T.'s performed: l_
Affachments: none
Number of Failures: _0
Total Time dudng tests: 2 hrs.
cc..'
MIT report form
5112/00 L.G. Vujn4spl .xls 9/13/00
ALASiIA OIL AND GAS
CONSERVATION COPlPlISSION
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 9950] I3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Steve Shultz
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Milne Point Unit MPF-82i
BP Exploration (Alaska) Inc.
Permit No: 200-125
Sur Loc: 1991'NSL, 3010'WEL, Sec. 06, T13N, R10E, UM
Btmhole Loc. 4421'NSL, 2462'WEL, Sec. 12, T13N, R09E, UM
Dear Mr. Schultz:
Enclosed is the apprOved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test
before operation, and of the BOPE test performed before drilling below the surface casing shoe,
must be given so that a representative of the Commission may witness the tests. Notice may be
given by contacting the Commission petroleum field inspector on the North Slope pager at
659-3607.
Sincerely,' ~' ~.. ~
Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF. THE C~o~:MISSION
DATED this ~ ~- ~ day of August, 2000
dlf/En¢losures
cc: Department of Fish & Game, Habitat Section wlo end.
Depa~ment of Envimmenml Conse~ation w/o encl.
STATE OF ALASKA
ALASK(' "~IL AND GAS CONSERVATION CONj' $SION
A,-PLICATION FOR SUNDRY APPROVAL
1. Type of Request:
[] Abandon
[] Alter Casing
Bil Change Approved Program
[] Suspend
[] Repair Well
[] Operation Shutdown
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2331' NSL, 3725' WEL, SEC. 33, T13N, R10E, UM
At top of productive interval
4506' NSL, 4735' WEL, SEC. 29, T13N, R10E, UM (As Planned)
At effective depth
4543' NSL, 4846' WEL, SEC. 29, T13N, R10E, UM
At total depth
4543' NSL, 4846' WEL, SEC. 29, T13N, R10E, UM
[] Plugging [] Time Extension
[] Pull Tubing [] Vadance
[] Re-Enter Suspended Well [] Stimulate
[] Perforate
[] Other
5. Type of well: [] Development
I-I Exploratory
I-I Stratigraphic
I"1 Service
6. Datum Elevation (DF or KB)
Plan KBE = 29.5'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPI-09
9. Permit Number
20O- 1 O3
10. APl Number
50-029-22964-00
11. Field and Pool
Milne Point Unit / Schrader Bluff
12.
Present well condition summary
Total depth: measured
Effective depth:
casing
13094 feet Plugs (measured)
true vertical 7197 feet
measured 13094 feet Junk (measured)
true vertical 7197 feet
Length Size
Structural
Conductor
Surface
Intermediate
Production
Liner
112'
6534'
ORIGINAL
Cemented.
MD TVD
112' 1'12'
6562' 4087'
20" 260 sx Arcticset (Approx.)
9-5/8" 840 sx Arcticset 3-Lite, 385 sx 'G'
Perforation depth: measured None
true vertical 'None
Tubing (size, grade, and measured depth) None
Packers and S$SV (type and measured depth) NOne
13. Attachments
~'Descdption Summary of Proposal
14. Estimated date for commencing operation
August 9, 2000
16. If proposal was verbally approved
Tom Maunder
Name of approver
8/9/2OOO
Date Approved'
Contact Engineer Name/Number: Steve Shultz, 564-5491
15.
I-I Detailed Operations Program I-I 'BOP Sketch
Status of well classifications as:
[] Oil I-I Gas I-I Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17.1 hereby certify that the f~e~oing is tr{~e ~]~d cor~ct to the best of my knowledge //
Signed Stev:$hultz ~ ~ Title Senior DrillingEngineer Date
~ ~'''~~~&~ ' ~~" ' ' ~ ' ' ' ~ 't' ' ~ ""- ' '~ '"m~4~, ' ~?~'.~"",~,
~ndRions of Approval: Noti~ ~mmi~ion ~ mpmsen~tive may wRne~
Plug i~eg.~__ BOP Te~__ Lo~fion clearance__ Approval No. ~O0 - 2 n~/
J M~hani~l Integ~ Te~__ Subsequent ~rm r~uir~ lO-
Approved by o~er of the Commission Commissioner Date
Form 10-403 Rev. 06115/88 Submit In Triplicate
· STATE OF ALASKA
ALASKA(' .L AND GAS CONSERVATION COMI~ SION i~"
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of work [] Drill r'l Redrill 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE = 29.5' Milne Point Unit / Kuparuk
3. Address 6. Property Designationc. z~3 RiverSands
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 388235
.4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1991' NSL, 3010' WEL, SEC. 06, T13N, R10E, UM Milne Point Unit
At top of productive interval 8. Well Number
4471' NSL, 2388' WEL, SEC. 12, T13N, R09E, UM MPF-82i Number 2S100302630-277
At total depth 9. Approximate spud date
4421' NSL, 2462' WEL, SEC. 12, T13N, R09E, UM 08/24/00 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property '15. Proposed depth (MD and TVD)
ADL 025509, 2462' MD~ No Close Approach 1920 9406' MD / 7302' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 350' Maximum Hole Angle 45 ° Maximum surface 1492 psis, At total de~h (TVD) 7057' / 2303 psig
18. Casing Program Setting Depth
~ize Specifications T~ ,D Bot':om Quantity of Cement
Hole CasinQ WeiQht Grade Cou01inQ LenQth MD TVD MD TVD (include staqe data)
30" 20" 54.5# K-55 Weld 78' Surface Surface 78' 78' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC 5259' 30' 30' 5_P59' 4219' 716 sx AS 3 Lite~ 286 sx Class 'G'
8-1/2" 7" 26# L-80 BTC 9406' 30' 30' 9406' 7302' 172 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feetORIGINAL
Effective depth: measured feet Junk (measured)
true vertical feet
Casing . Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production ?'"':~' !i!{!iii iii. ii~,I !i!!.!! ~i ',i~ ,.,i, '~:.. ....... !'.: '...
.... ;.; ,;: .,;' '., .. :... ,..~ ..:..:..
Liner i~"~.'..;~:: .. , ;'.
~"'~:i,~,,'; "'~ '~" ....
Perforation depth: measured ,~&~iA.;..',~ :',,,~,,.. ~''~ ,~:.,"" ,~.~:~,,:~' ...... { :, ¥"i:~:, ~,i;:;,;'::' f:!
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Michael Triolo, 564-5774 Prepared By Name/Number: Terrie H~_~_h_h!e, 5~4-4528
21. I hereby certify that the fo~i3oinl~ is true anqf'~orlect to#he best of my knowledge / /
~i~ned Steve Shu,tz X~ ~'~~-. Title Senior Drilling Engineer Date
Permit Number ; APl Number Appy, pya_l Date _ See cover letter
',~-~ '- ~' ~-,f~'"". 50- ~ Z.-~-' ~7-..,~-.~::~ '7/- ~ ~/-'~'/"J-//~ 0 for other requireme..nts
Conditions of Approval: Samples Required I-! Yes ~No Mud Log I~'c:/quire~l~'- [] Yes I~"No
Hydrogen Sulfide Measures I-I Yes l~ No Directional Survey Required I~rYes I-I No
Required Working Pressure for BOPE I-I 2K ~3K r-I 4K r-I 5K I-! 10K [] 15K [] 3500 psi for CTU
Other: C~_w~L,,~(~'~.~ ~:~ ¥~ ~----
Approved Blt ORIGIN^/SIGNED BY Comm!,sioner the commission Date
SL~mit In Triplicate
Form 10-401 Rev. 12-01-85 D Taylor Seamount
08/15/00 T[~ 11:32
FAX 907 349 8403
,.
~002/002
MPF-82i Rigsite Drillin Hazards and C_o,ntin_ encies
POST THIS NOTICE IN THE DOGHOUSE
Well Control
Abnormal pressures are present both in and sometimes above the Kuparuk reservoir zone and have
required significantly higher mud weights then originally expected. This fault block is expected to be
unde. rpressured to 6 ppg EMW due to production from MPL-40 (2,278 psi on 6/9/00).
Hydrates and Shallow gas
A. There has never been any hydrates, shallow gas, or unexpected shallow hydrocarbon problems on F-
pad.
III. Lost Circulation/Breathing
A. Lost circulation is unlikely.
B. Breathing is well documented at Milne Point between the Schrader Bluff and the HRZ when ECD's
reach 11.5 ppg,
IV.
V!
Stuck Pipe
A. We do not expect stuck pipe.
Hydrogen Sulfide
A. MPF-Pad Is not a designated H2S Pad.
VI. Faults
A. The planned directional trajectory crosses one fault. This fault has been previously crossed in MPF-
81 with no problems associated with it.
CONSULT THE F PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
Version 1.0 MPF-82i Hazards and Contingencies Page ! of 1
~L _~~hare. d
~ ~erwces
BP Exploration / Phillips Alaska Inc.
ARClIC COASTAL TEAM
MPF-82i Grassroots Injector Permit
Date
d ~By: ~ ;
Appro ?~, ,,. ~,
S~i'br Drilling-'~n~llrf'eer 't.~
Date
Version #1, 8/10/00 I
IWell Name: IMPF-82i I
Well Plan Summary
I Type of Well (producer or injector):
Conventional Injector
Surface Location: 1991' FSL (3288' FNL), 3010' FEL (2147' FWL), SEC. 06, T13N, R10E
X = 541,552.06 Y = 6,035,441.68
Target Location: 4471' NSL (808' FNL), 2388' FEL (2891' FWL), SEC. 12, T13N, R09E
X = 537,031 Y = 6,032,618 Z = 7,005' TVDss
Bottom Hole Location: 4421' FSL (857' FNL), 2462' FEL (2816' FWL), SEC. 12, T13N, R09E
X = 536,956.67 Y = 6,032,568.31 Z = 7,261' TVDss
[AFE Number: I 337194 I I Rig: I Doyon 141
I Estimated Start Date: I Aug 24, 2000 I I Operating days to complete: I 16.59
lED I 9,405' I I TVDrkb:17,302' I IEEE= 129.5'
Well Design (conventional, slim hole, etc.): I S-shaped Injector (grass mots well)
Objective:
Drill 12-1/4" hole out of 20" conductor, build angle to 45° hold tangent for 2,800' to
15' TVD below the base of the Schrader Bluff Reservoir (5,259' MD; 4,178' TVDss).
Run and cement 9-5/8" surface pipe to surface, drill out with 8-1/2" hole, continue to
hold the 45° tangent for another 3,000', at which time start dropping angle @ 3°/100'
to 20°, hold tangent to TD (9,406'MD; 7,261' TVDss). Run and cement 7"
Intermediate casing. Run Bond log and 3-1/2" injector completion. The well is
designed to support MPL-40.
Asset Production/Injection Forecast:
Estimated Reserves: 0.8 MMSTBO
Expected Initial Rate: 1,500 BWPD
Expected 6 month avg: 1,500 BWPD
Well Information:
Well Name:
APl Number:
Well Type (proposed):
BHP:
BHT:
MPF-82i
S-shaped Injector
2,303 psi @ 7,057' TVDss, Base Kuparuk A sands (est. from offset wells) =6.3ppg
165°F @ 7,000' TVDss
Mechanical Condition:
MPF-81 Cellar box:
RKB to Cellar box:
Rig Elevation:
Conductor:
Elevation above MSL = 11.3'
29.5' (Estimated)
RKB + MSL = 40.8'
78' of 20", 54.5#, K-55
Version #1, 8/10/00 2
Drillin Program Overview
Surface and Anti-Collision Issues:
Surface Shut-in Wells: None required.
Close Approach Wells: NONE- All wells may flow.
I Well Name I Current Status I Production Priority
None
Precautions
Well Control: Expected Formation Pressures & BOPE Test Pressures
Expected BHP
2,303 psi, 7,057' TVDss
(estimated) 6.3 ppg
Max Exp Surface Pressure
1,492psi
(.115 psi/ft gas gradient)
BOPE Rating
5,000 psi WP
(Entire stack & valves)
Planned BOPE Test Pres.
J ,~_.~/250 psi Rams and Valves
2,000/250 psi Annular
Note: The wellbore will be drilled from surface to the Base Schrader Bluff through a 21-1/4",~si surface
diverter stack (expected normal Schrader reservoir pressure). The diverter will be removed and 'an .13-5/8", 5M
BOP stack will be installed and tested prior to running in the hole with the 8-1/2" drilling assembly..
Mud Program:
A detailed Baroid mud program is included with the well plan. In summary, an LSND water based mud
system will be used for this well. Follow the attached LCM Decision Matrix for this well in the event losses
occur.
Surface Hole: 12 1/4" Hole to 4,835' MD (9 5/8" Casing)
(Deep Set Surface - No Gas Hydrates Anticipated)
Suggested Mud Properties Ran.qes
Density Funnel
(ppg) Viscosity
8.6 50
to to
9.4 150
Yield 10Sec 10Min pH APl
Point Gels Gels Filtrate
15 8 10 9 8
to to to to to
35 15 30 10 15
Solids
(% LGS)
<8
Intermediate/Production Hole: 8 1/2" Hole to 10,540' MD (7" Casing)
Su,q,qested Mud Properties Ran,qes
Density Funnel Yield 10 Sec 10 Min pH APl HTHP Solids
(ppg) Viscosity Point Gels Gels Filtrate Filt. (cc's) (% LGS)
8.6 35 6 3 7 8.5 6-12 <6
to to to to to to to
9.6 45 20 5-8 10-15 9.5 4-6 10-12 (f/topHRZ)
Waste Disposal: No annular injection is allowed at Milne point. All drilling waste will be hauled to KRU 'IR'
pad or PBU Drillsite 4. Call the Pad 4 waste disposal site prior to truck leaving location so the site can be
i'.,...,;~: ',~': ~' ;;; ~"-,.'."~;,,
,.,"'?. ..... ~ ,.,' ~:' '~.!...,~ ¥' I":..,.';.'
i::, :: '"" ', 'Y'c.","" ','"""','.
Version #1, 8/10/00
Formation Markers: :...:.-,~-..-... ~..
Formation Tops MD TVDss Pore EMW (ppg) Comments
Pressure
(psi)
Base Permafrost 1,925 1,800
Top Schrader 4,847 3,889
Base Schrader 5,238 4,163
Top HRZ/TUDZ
Base HRZ 8,706 6,624
KLGM 8,788 6,694
TKUD (Kup Caprock) 8,960 6,845
Kuparuk C 9,087 6,962
Kuparuk B 9,093 6,967
Kuparuk A 9,133 7,005 2,284 6.27
TKA3 9,142 7,013 2,286 6.27
TKA2 9,159 7,029 2,293 6.27
TKA1 9,189 7,057 2,303 6.27
Miluveach 9,248 7,113
OWC 9,171 7,040 ~.'
TD 9,406 7,261 TMLV + 150' MD
Casing/Tubing Program:
Hole Size Csg/ Wt/Ft Grade Conn Casing Casing Top Hole Btm
Tb9 O.D. Length MD/TVDrkb MD/TVDrkb
12-1/4" 9-5/8" 40# L-80 B,C 5,259' 30'/30' 5,259'/4,219'
8-1/2" 7" 26# L-80 BTC 9,406' 30'/30' 9,406'/7,302'
Cement Calculations:
ICasin Size I 9-5/8", 40#, BTC '1
Basis1 80' shoe jts, 30% excess in open hole, 250% in permafrost (12-1/4" hole), cement to surface
I Shoe Depth: 5,259' MD (4,219' TVDrkb), '
I Total Cement Volume: I Spacer 1 75 bbls of B45 Viscosified Spacer Weighted to 10.4 ppg.
I Lead 1 716.38 sxs (566 bbls), AmticSet 3 - Lite, Yield 4.44 ft3/sx, mix fluid 20.129
I I gps, 10.7 ppg
Tail
Temp
286.29 sxs (59.4 bbls), Class 'G' + 0.35% D65 + 0.5% S001 + 0.45% D167
+ 0.2% D046, Yield 1.16 ft3/sx, mix fluid 5.081 gps, 15.8 ppg
BHST -80° F from SOR, BHCT 65° F estimated by Dowell
ICasin g Size 1 7", 26#, BTC I
Basis 80' shoe jts, 30% excess in open hole, cement to 1,000' above shoe.
Shoe Depth: 9,406' MD (7,302' TVDrkb),
Total Cement Volume: I Spacer I 50 bbls of B45 Viscosified Spacer Weighted to 10.6 ppg.
I Tail I 172 sxs (35.5 bbls), Class 'G' + 0.27% D065 + 0.4% D167 + 0.15% D800 +
I 1 0.1 gal/sk blend D047, Yield 1.16 ft3/sx, mix fluid 4.989 gps, 15.8 ppg
I Temp I BHST -170° F from SOR, BHCT 140° F estimated by Dowell
Version #1,8/10/00 4
9-5/8" Centralizer Placement:
1. Run (1) rigid straight blade centralizer per joint on the first 28 joints.
2. Centralizers should be attached to float between the tool joints.
3. Run 1 Bow Spring centralizer on either side of the Port collar with stop collars.
7" Centralizer Placement:
1. Run (1) rigid straight vane centralizer per joint on the first 25 joints.
2. Centralizers should be attached to float between the tool joints.
Other Cement Considerations: 1. Mix the slurries on the fly (Batch mix if < 100 bbl). 2. Confirm blends and calculations at the rig site.
3. There will be a TAM Port Collar in the 9-5/8" casing at 1,000' MD for a surface
cement contingency plan in the event cement does not reach surface on the
primary job. If cement does not reach surface, an inner-string will be run with a
port collar shifting tool to engage the port collar and pump the second stage
cement job to obtain cement to surface.
Survey and Logging Program:
Surface Hole LWD: Dir/GR
Surface Hole Survey: Drop ESS, Photo Gyro (use Gyrodata if necessary)
Intermediate Hole:
Intermediate Casing:
DirlGR/Res/PWD(real time), drop ESS.
GR/CCL/CBL
Perforating: Will be perforated Post-Rig via E-line- conveyed 2-7/8" guns.
Locations Kuparuk A Sands
Perf Interval: Approximately 70' of perfs
Gun Size I Type: 2-7/8" (SWS), 6 SPF, 60° phasing, deep penetrating charges
Delivery: Post rig E-line conveyed
Under Balance: Overbalanced
BHP: 2,303 psi @ 7,057' TVDss
BHT: 165OF
Version #1, 8/10/00
?"~'~..,' ~.~ { [ ,x.,,.; ...i
,',,. ..... ~, . ~.,;:,;~ ; ,.??,.,..,:T:,,,,,.~,,,~.,%,,..,
~i,~i,::i:~i~i:i,.~:! [,..;;'i'[! ~,.i~ ~;..',~::2i..:'~" ....... ii:ii!;.... ........ ; ....... ::~.;:~
..",!: ~1~(' }~l~'=i~:':,'-: ~'."~!;~
.., ,.
MPF-82i Operations Snapshot Summary
Drill and Case Proqram:
1. MIRU Doyon 141.
2. NU 21-1/4" diverter, pick up 5" DP
3. MU 12-1/4" BHA, spud in drill to planned Surface hole TD (5,259' md).
4. Run 9-5/8", 40#, L-80, BTC casing and cement to surface.
5. ND diverter, NU Gen 5a wellhead & 13-5/8" BOP, test.
6. MU 8-1/2" BHA, drill out float equipment plus 30' of new formation, perform FIT (minimum 11.5 ppg EMW).
7. Drill to planned Intermediate hole TD (10,540' md). "'--"
8. Run 7", 26#, L-80, BTC casing and cement to 1,000' above the shoe.
9. RU E-Line, run GR/JB and CBL
10. Make DP cleanout run to below packer setting depth if necessary (dependent on success of GR/JB)
11. Run 3-1/2" injector completion
12. Set TWC
13. ND BOP, NU tree, test to 5,000
14. Remove TWC, install BPV, freeze protect.
15. RD, move off well.
16.
Post Ricl Work Proqram:
1. Pull RHC ball and rod.
2. Perforate
Formation Inteqrity Test Procedure:
1. Determine the required surface pressure.
2. In the case of a surface casing shoe, a PPG EMW should be sufficient unless the well plan notes
differently.
3. Test the casing prior to drilling out the float collar.
3.].l.Run the mud pump at a constant 0.254.5 bpm and record results. One-stroke pressure
readings are recommended, but in all cases record pressures in at least five-stroke increments. If
the pressures are increasing rapidly enough to make this reading too large, take pressure readings
at 30-second intervals. Plot the results for reference during the following LOT.
3.1.2.When the required test pressure is reached, suspend pumping and hold the test pressure for thirty
minutes. Check that the test is being accurately recorded on a chart.
4. Drill remaining cement, float collar, float shoe and 20-ft to 50-ft of new hole.
4.1.1 .Note: In cases where mud weight will be reduced at a minimum of 0.5 PPG after drilling out for
the next hole interval, a drill out formation integrity test may be used. In this case, the 20-ft to 50-ft
of new hole will be exposed to the higher mud weight and a flow check performed for a minimum of
10 minutes. If no losses are observed during the flow check, a conventional FIT is not required.
The drill out FIT may only be used if stated as such in the drilling permit for the respective well
Se
6.
7.
8.
9.
10. Stop the pump when the required test pressure is reached.
11. Close appropriate valves if surface leaks are suspected.
Circulate and condition mud to a constant mud weight and rheology.
Pull into the casing shoe.
Close a blowout preventer.
Run the mud pump at a constant 0.25 to 0.5 bpm.
Match the pump rate to the one used during the previous casing pressure test.
Version #1, 8/10/00 6
12. Hold and record the pressure every 30 seconds for 10 minutes minimum.
13. In the event that the pressure continues to bleed off without becoming constant continue to hold and record
the pressures at 30 second intervals for another 5 minutes. Surface equipment should be checked for leaks
and if any found the test redone.
14. Check to ensure that the chart recorder is accurately recording the test.
]5. Bleed back mud from the well and compare with the volume pumped. Record volume in trip tank or
cement tanks.
16. Document the FIT results on the IADC sheet and on next morning report. For consistency among
rigs, use the Excel spreadsheet LOT Version 5.0 (on the Drilling File Server in the LOT folder) to plot
the casing and leak off tests. Immediately send the leak-off test plot and pressure recorder charts to
the office to be stored with the rest of the reports in the well file. If there is any question about the
interpretation of the FIT results, inform the drilling superintendent before drilling ahead
Version #1, 8/10/00 7
Proposed Completion MP¥;-82i
[
TREE: 3-1/8~, heron 5M Rev. A
.... II., DOYEN 141 ,
WELLHEAD: FMC Gert 5A 5M ' ' '
Tubing hanger: 11" X 3-1/2" Orig. KB Elev. = 29.5,
I i , Orig. GL Elev. = 11.1
Conductor Caing ~ i '.
I i 3-1/2"x Nipple (2.813" ID) 1-2200'
KOP
-350'
MD
MAX HOLE Angle 45° AT
2,470' MD
,
' ~
i[ ~l ..... il~'~ ''~I''' !ii?':;'?-''i:~ i..~ i~'i"'" '..., ~:i ~ii' !il.i 'I'' I:'''~'.', !'':'?':':~'':.., ~..~
il " .......... - ................... .~...~.....-~,,~.'.,=~:~,.~.~i~,.
'":';:, ';¥"i"';~' '~'i'; :~,', ",,,'~' ',
3-1/2" 9.3 ppf, L-SO, NSCT tbg.
I 3-1/2" x Nipple (2.813" ID)
7"x 3-1/2" Baker Packer I
I' 3-1/2" XN Nipple (2.75" Min ID)
~- "B" sand (may perforate in
Stimulation Summary the future, so make sure
none ~ the tubing tail is 50' MD
above the "B" sand)
Perforation Summary "A3"
Size SPF Interval (TVD) "A2"
Kup 'A' Sand "Al"
~_-7/8 6 -70' total (Al, A2, & A3)
7" 26 ppf, L-80, Mod. Btm. prod. casing
7" Landing Collar (PBTD)
7" float collar
7" shoe I 9,406' MD
DATE REV. BY COMMENTS
MILNE POINT UNIT
7-17-00 TC Proposed Initial Completion WELL No.: F-82i
APl: 50-029-XXXXX
BP EXPLORATION (Al()
I DrillQuest' -
North Slope Alaska
Alaska State Plane 4
Milne Point MPF
MPF-82
1400
DIr ~ 1.000°ll00ft: 350.00ff MD, 350.00ft TVD
Oir Rate ~ 1.500°1100ff: 550.O0ft MD, 549.96ft TVD
in Dir Rate O 2.000'll00ft: 750.00ft MD, 749.56fl TVD
DIr Rate ~ 2.500'1100ft: 952.12ft MD, 950.14ft TVD
Dir Rate (~ 3.000'll00ft: 1112.12ft MD, 1107.17ft TVD
Dir: 1851.20ft MD, l?80.00ft ~
Dir (~ 3.000°ll00ft: 1999.41lt MD, 1902.33ff TVD
Dir: 2469.10ft MD, 2262.66ft TVD
Baze Permafrmt - 1841.30 TFD
28OO
4200
9 5/8"Casing-5259.43MD,4219.30TVD
Scale: linch = 1400ft -4200
m
~ -1400
II
~ -2800
Eastings
-2800 -1400 0
'4~L5~m TVO
Immase In D~ Rate (~ 3.(X)O'll00fl: 1112.121t MD, _t 10?.l?ft TVD ~ 841.oo
End Dr': 185t.20ft MD, 1780.00ft ~ ~ ~1~.~
Beg~ DIr O 3.000'11001t: 1ggg.41ft MD, lgO2.33ft TVD ~
End Dk: 246g.t0ft MD, 2262,661t
'3336.1B
95/8"Casing.5259.43MD,42 ! 9.30TVD ~
-1400
MPg-44 TI - ?04&$0 TVD ~ II
· t~d~, B ;n D~r 3 000 I100ft 8294 97fi MD 6347 88ft 'FVD c:
: 8294.97ft MD, 6347.88ft 'rvD
7L2o End DIr: 9144.14ff MD, 7056.30ff TVD
~. Z~_o~E~,r~?~o~.~ -2800
I I I I
-4200 -2800 -1400 0
Scale: linch = 1400ff Eastings Reference is True North
· S~F-NA (lop ~ltraderl - $950.$0 I'FD
· SBA$ (Base.Y~rader) - 420~1.$0 I'VD
56O0
~.. 7000
Dir ~ 3.000°ll00ft: 8294.97fl MD, 6347.88ff TVD
I
0 1400
Scale: linch = 1400ft
B~i~i~~i~i~~~i~ii~
~tgZ~t'4'/'/'-'~0/t.70'~/~ ......
Total Deplh: 9405.56ff MD, 7301.95ft TVD
~' Liner - g405.56 MD, 7301.g5 TVD
I I I
2800 4200 5600
Section Azimuth: 238.304° (True North)
Vertical Section
Sperry-Sun Drilling Services
Proposal Report for MPF-82 Wp3
Revised: 20 July, 2000
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(~) (~)
0.00 0.000 0.000 -41.30
100.00 0.000 0.000 58.70
200.00 0.000 0.000 158.70
300.00 0.000 0.000 258.70
350.00 0.000 0.000 308.70
400.00 0.500 270.000
500.00 1.500 270.000
550.00 2.000 270.000
600.00 2.750 270.000
700.00 4.250 270.000
358.70
458.68
508.66
558.62
658.43
750.00 5.000 270.000 .708.26
800.00 5.984 268.145
900.00 7.964 265.811
952.12 9.000 265.000
758.03
857.29
908.64
1000.00 10.197 265.000 956.05
1100.00 12.697 265.000 1064.05
1112.12 13.000 265.000 1065.87
1200.00 15.572 262.644 1151.02
1300.00 18.520 260.745 1246.62
1350.00 20.000 260.000 1293.82
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
(~) (~) (~) (~) (~)
0.00 0.00 N 0.00 E 6035441.68 N 541552.06 E
100.00 0.00 N 0.00 E 6035441.68 N 541552.06 E
200.00 0.00 N 0.00 E 6035441.68 N 541552.06 E
300.00 0.00 N 0.00 E 6035441.68 N 541552.06 E
350.00 0.00 N 0.00 E 6035441.68 N 541552.06 E
400.00 0.00 N 0.22W 6035441.68 N 541551.84E
499.98 0.00 N 1.96W 6035441.67 N 541550.10 E
549.96 0.00 N 3.49W 6035441.66 N 541548.57 E
599.92 0.00 N 5.56 W 6035441.65 N 541646.50 E
699.73 0.00 N 11.67 W 6035441.61 N 541540.39 E
749.56 0.00 N 15.70W 6035441.59 N 541536.36 E
799.33 0.08 S 20.48W 6035441.48 N 541531.58 E
898.59 0.76 S 32.60W 6035440.74N 541519.46 E
950.14 1.38 S 40.27W 6035440.08 N 541511.80 E
997.35 2.07 S 48.22W 6035439.34N 541503.85 E
1095.35 3.80 S 67.99W 6035437.50 N 541464.09 E
1107.17 4.04 S 70.67W 6035437.25 N 541481.41E
1192.32 6.41S 92.22W 6035434.75 N 541459.88 E
1287.92 10.68 S 121.22W 6035430.32 N 541430.91E
1335.12 13.45 S 137.47W 6035427.46 N 541414.66 E
Dogleg
Rate
('/100ft)
0.000
0.000
0.000
0.000
1.000
1.000
1.000
1.500
1.500
1.500
2.000
2.000
2.000
2.500
2.500
2.500
3.000
3.000
3.000
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(ft)
0.00
0.00
0,00
0.00
0.00
0.19
1.67
2.97
4.73
9.93
13.36
17.47
28.14
34.98
42.12
59.85
62.25
81.84
108.75
124.03
Comment
Be~in Dir C~ 1.000°ll00ft:
350.00ft MD', 350.00ft TVD
Increase in Dir Rate~_
1.500°ll00ft: 550.00ff MD,
549.96ft TVD
Increase in Dir Rate (~.
2.000°/100ft: 750.00ff MD,
749.56ft TVD
Increase In Dir Rate ('~.
2.500°1100ft: 952.12ff MD
950.14ft TVD '
Increase in Dir Rate ('~
3.000°ll00ft: 1112.I2ft MD,
1107.17ft TVD
Continued...
20 July, 2000.15:17 - f - DrillQuest 1.05.05
Sperry-Sun Drilling Services
Proposal Report for MPF-82 Wp3
Revised: 20 July, 2000
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
1400.00 21.396 258.446 1340.59 1381.89
1500.00 24.224 255.856 1432.76 1474.06
1600.00 27.086 253.781 1522.90 1564.20
1700.00 29.974 252.077 1610.75 1652.05
1800.00 32.880 250.648 1696.07 1737.37
1851.20 34.374 250.000 1738.70 1780.00
1900.00 34.374 250.000 1778.98 1820.28
1925.11 34.374 250.000 1799.70 1841.00
1925.47 34.374 250.000 1800.00 1841.30
1999.41 34.374 250.000 1861.03 1902.33
2000.00 34.387 249.978 1861.52 1902.82
2100.00 36.606 246.501 1942.93 1984.23
2200.00 38.917 243.375 2021.99 2063.29
2300.00 41.303 240.551 2098.47 2139.77
2400.00 43.752 237.986 2172.17 2213.47
2469.10 45.475 236.345 2221.36 2262.66
2500.00 45.475 236.345 2243.03 2284.33
2600.00 45.475 236.345 2313.15 2354.45
2700.00 45.475 236.345 2383.27 2424.57
2800.00 45.475 236.345 2453.39 2494.69
2900.00 45.475 236.345 2523.52 2564.82
3000.00 45.475 236.345 2593.64 2634.94
3100.00 45.475 236.345 2663.76 2705.06
3200.00 45.475 236.345 2733.88 2775.18
3300.00 45.475 236.345 2804.00 2845.30
Local Coordinates
Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (~)
16.76 S 154.83 W 6035424.06 N 541397.32 E
25.43 S 192.61 W 6035415.18 N 541359.60 E
36.80 S 234.37 W 6035403.57 N 541317.90 E
50.85 S 28001 W 6035389.26 N 541272.34 E
67.54 S 329.40 W 6035372.30 N 541223.05 E
77.09 S 356.09W 6035362.60 N 541196.40 E
86.51S 381.98W 6035353.03 N 541170.57 E
91.36 S 395.30W 6035348.11N 541157.27 E
91.43 S 395.50W 6035348.04 N 541157.08 E
105.71S 434.73W 6035333.54N 541117.93 E
105.82 S 435.04W 6035333.43 N 541117.62 E
127.38 $ 488.93W 6035311.56 N 541063.85 E
153.35 S 544.36W 6035285.28 N 541008.57 E
183.66 $ 601.19W 6035254.66 N 540951.91E
218.23 S 659.26W 6035219.77 N 540894.03 E
244.55 S 700.03W 6035193.22 N 540853.41E
256.75 S 718.36W 6035180.91N 540835.14 E
296.27 S 777.71W 6035141.07 N 540776.02 E
335.78 S 837.05W 6035101.23 N 540716.90 E
375.29 S 896.40W 6035061.39 N 540657.77 E
414.80 S 955.74W 6035021.64N 540598.65 E
454.31S 1015.09W 6034981.70 N 540539.53 E
493.82S 1074.43W 6034941.86 N 540480.41E
533.33 S 1133.78W 6034902.02N 540421.28 E
572.84 S 1193.12W 6034862.17 N 540362.16 E
Dogleg
Rate
(~oo~)
3.000
3.000
3.000
3.000
3.000
3.000
0.000
0.000
0.000
0.000
3.000
3.000
3.0O0
3.000
3.000
3.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(~)
140.54
177.24
218.75
254.96
315.75
343.48
370.46
384.34
384.54
425.43
425.75
482.93
543.74
608.02
675.59
724.10
746.12
817.37
888.63
959.88
1031.13
1102.38
1173.64
1244.89
1316.14
Comment
End Dir' 1851.20ft MD,
1780.00ft TVD
Base Permafrost
Be~in Dir ~, 3.000°ll00ft:
1999.41ft MD. 1902.33ft TVD
End Dir: 2469.10ft MD,
2262.66ft TVD
Continued...
20 July, 2000. rS:f7 .2 - DrillQuest 1.05.05
North Sldpe Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(~) (~) (~)
3400.00 45.475 236.345 2874.13 2915.43
3500.00 45.475 236.345 2944.25 2985.55
3600.00 45.475 236.345 3014.37 3055.67
3700.00 45.475 236.345 3084.49 3125.79
3800.00 45.475 236.345 3154.61 3195.91
3900.00 45.475 236.345 3224.74 3266.04
4000.00 45.475 236.345 3294.86 3336.16
4100.00 45.475 236.345 3364.98 3406.28
4200.00 45.475 236.345 3435.10 3476.40
4300.00 45.475 236.345 3505.22 3546.52
4400.00 45.475 236.345 3575.35 3616.65
4500.00 45.475 236.345 3545.47 3686.77
4600.00 45.475 236.345 3715.59 3756.89
4700.00 45.475 236.345 3785.71 3827.01
4800.00 45.475 236.345 3855.84 3897.14
4847.30 45.475 236.345 3889.00 3930.30
4900.00 45.475 236.345 3925.96 3967.26
5000.00 45.475 236.345 3996.08 4037.38
5100.00 45.475 236.345 4066.20 4107.50
5200.00 45.475 236.345 4136.32 4177.62
5238.04 45.475 236.345 4163.00 4204.30
5259.43 45.475 236.345 4178.00 4219.30
5300.00 45.475 236.345 4206.45 4247.75
5400.00 45.475 236.345 4276.57 4317.87
5500.00 45.475 236.345 4346.69 4387.99
5600.00 45.475 236.345 4416.81 4458.11
Local Coordinates
Global Coordinates
Nothings Eastings Northings Eastings
(~) (~) (~) (~)
612.35 S 1252.47W 6034822.33 N 540303.04 E
651.86 S 1311.81W 6034782.49 N 540243.92 E
691.37 S 1371.16W 6034742.65 N 540184.79 E
730.88 S 1430.50W 6034702.81N 540125.67 E
770.40 $ 1489.84W 6034662.96 N 540066.55 E
809.91 $ 1549.19W 6034623.12 N 540007.43 E
849.42 S 1608.53W 6034583.28 N 539948.30 E
888.93 S 1667.88W 6034543.44N 539889.18 E
928.44S 1727.22W 6034503.60 N 539830.06 E
967.95 S 1786.57W 6034463.75 N 539770.93 E
1007.46 $ 1845.91W 6034423.91N 539711.81E
1046.97 $ 1905.26W 6034384.07 N 539652.69 E
1086.48 S 1964.60W 6034344.23 N 539593.57 E
1125.99 S 2023.95W 6034304.38 N 539534.44 E
1165.50 $ 2083.29W 6034264.54N 539475.32 E
1184.19 $ 2111.36W 6034245.70 N 539447.36 E
1205.01S 2142.64W 6034224.70 N 539416.20 E
1244.53 S 2201.98W 6034184.86 N 539357.08 E
1284.04 $ 2261.33W 6034145.02 N 539297.95 E
1323.55 S 2320.67W 6034105.17 N 539238.83 E
1338.58S 2343.25W 6034090.02N 539216.34E
1347.03S 2355.94W 6034081.49N 539203.69E
1363.06 S 2380.01W 6034065.33 N 539179.71E
1402.57 S 2439.36W 6034025.49 N 539120.58 E
1442.08 $ 2498.70W 6033985.65 N 539061.46 E
1481.59 S 2558.05W 6033945.80 N 539002.34 E
Dogleg
Rate
(°/'lOOft)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
Milne Point MPF
Verdcal
Section
(~)
1387.39
1458.65
1529.90
1601.15
1672.41
1743.66
1814.91
1886.16
1957.42
2028.67
2099.92
2171.17
2242.43
2313.68
2384.93
2418.63
2456.19
2527.44
2598.69
2669.94
2697.05
2712.29
2741.20
2812.45
2883.70
2954.96
Comment
SBF-NA (Top Shrader)
SBA5 (Base Shrader)
95/8"Casing
Sperry-Sun Drilling Services
Proposal Report for MPF-82 Wp3
Revised: 20 July, 2000
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(~) (~)
5700.00 45.475 236.345 4486.93
5800.00 45.475 236.345 4557.06
5900.00 45.475 236.345 4627.18
6000.00 45.475 236.345 4697.30
6100.00 45.475 236.345 4767.42
6200.00 45.475 236.345 4837.54
6300.00 45.475 236.345 4907.67
6400.00 45.475 236.345 4977.79
6500.00 45.475 236.345 5047.91
6600.00 45.475 236.345 5118.03
6700.00 45.475 236.345 5188.15
6800.00 45.475 236.345 5258.28
6900.00 45.475 236.345 5328.40
7000.00 45.475 236.345 5398.52
7100.00 45.475 236.345 5468.64
7200.00 45.475 236.345 5538.77
7300.00 45.475 236.345 5608.89
7400.00 45.475 236.345 5679.01
7500.00 45.475 236.345 5749.13
7600.00 45.475 236.345 5819.25
7700.00 45.475 236.345 5889.38
7800.00 45.475 236.345 5959.50
7900.00 45.475 236.345 6029.62
8000.00 45.475 236.345 6099.74
8100.00 45.475 236.345 6169.86
Ve~ical Local Coordinates Global Coordinates
Depth Nothings Eastings Nothings Eastings
(~) (~) (~) (~) (~)
4528.23 1521.10 S 2617.39W 6033905.96 N 538943.22 E
4598.36 1560.61S 2676.74W 6033866.12 N 538884.09 E
4668.48 1600.12 S 2736.08W 6033826.28 N 538824.97 E
4738.60 1639.63 S 2795.43W 6033786.44N 538765.85 E
4808.72 1679.14 S 2854.77W 6033746.59 N 538706.73 E
4878.84 1718.65 $ 2914.12W 6033706.75 N 538647.60 E
4948.97 1758.17 S 2973.46W 6033666.91N 538588.48 E
5019.09 1797.68 S 3032.81W 6033627.07 N 538529.36 E
5089.21 1837.19 S 3092.15W 6033587.23 N 538470.23 E
5159.33 1876.70 S 3151.49W 6033547.38 N 538411.11E
5229.45 1916.21S 3210.84W 6033507.54N 538351.99 E
5299.58 1955.72 S 3270.18W 6033467.70 N 538292.87 E
5369.70 1995.23 S 3329.53W 6033427.86 N 538233.74E
5439.82 2034.74S 3388.87W 6033388.01N 538174.62 E
5509.94 2074.25 S 3448.22W 6033348.17 N 538115.50 E
5580.07 2113.76 $ 3507.56W 6033308.33 N 538056.38 E
5650.19 2153.27 S 3566.91W 6033268.49 N 537997.25 E
5720.31 2192.78 $ 3626.25W 6033228.65 N 537938.13 E
5790.43 2232.30 S 3685.60W 6033188.80 N 537879.01E
5860.55 2271.81S 3744.94W 6033148.96 N 537819.88 E
5930.68 2311.32 S 3804.29W 6033109.12 N 537760.76 E
6000.80 2350.83 S 3863.63W 6033069.28 N 537701.64E
6070.92 2390.34 S 3922.98W 6033029.44 N 537642.52 E
6141.04 2429.85 S 3982.32W 6032989.59 N 537583.39 E
6211.16 2469.36 S 4041.66W 6032949.75 N 537524.27 E
Dogleg
Rate
(~100ff)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
Milne Point MPF
Ve~ical
Section
(fi)
3026.21
3097.46
3168.71
3239.97
3311.22
3382.47
3453.72
3524.98
3596.23
3667.48
3738.74
3809.99
3881.24
3952.49
4023.75
4095.00
4166.25
4237.50
4308.76
4380.01
4451.26
4522.52
4593.77
4665.02
4736.27
Comment
Continued...
20 July, 2000. rS:f7 - 4 - DrillQuest 1.05.05
Sperry-Sun Drilling Services
Proposal Report for MPF-82 Wp3
Revised: 20 July, 2000
North Slope Alaska
Measured Sub-Sea
Depth Incl. Azim. Depth
(~) (~)
8200.00 45.475 236.345 6239.99
8294.97 45.475 236.345 6306.58
8300.00 45.324 236.346 6310.11
8400.00 42.324 236.359 6382.25
8500.00 39.324 236.373 6457.91
8600.00 36.324 236.390 6536.90
8700.00 33.324 236.410 6618.98
8706.01 33.144 236.411 6624.00
8788.47 30.670 236.429 6694.00
8800.00 30.324 236.432 6703.93
8900.00 27.324 236.459 6791.53
8959.71 25.533 236.478 6845.00
9000.00 24.324 236.493 6881.54
9087.43 21.701 236.529 6962.00
9092.81 21.540 236.531 6967.00
9100.00 21.324 236.535 6973.70
9133.49 20.320 236.551 7005.00
9142.01 20.064 236.556 7013.00
9144.14 20.000 236.557 7015.00
9159.04 20.000 236.557 7029.00
9170.75 20.000 236.557 7040.00
9188.84 20.000 236.557 7057.00
9200.00 20.000 236.557 7067.49
9248.43 20.000 236.557 7113.00
9255.56 20.000 236.557 7119.70
Vertical Local Coordinates Global Coordinates
Depth Northings Eastings Northings Eastings
fit) (ft) (ft) (~) (~)
6281.29 2508.87 S 4101.01 W 6032909.91 N 537465.15 E
6347.88 2546.40 S 4157.37 W 6032872.07 N 537409.00 E
6351.41 2548.38 S 4160.35 W 6032870.07 N 537406.03 E
6423.55 2586.74 S 4217.99 W 6032831.38 N 537348.61 E
6499.21 2622.95 S 4272.41 W 6032794,87 N 537294.39 E
6578.20 2656.90 S 4323.47 W 6032760.64 N 537243.52 E
6660.28 2688.50 S 4371.03 W 6032728.78 N 537196.14 E
6665.30 2690.32 S 4373.77 W 6032726.94 N 537193.40 E
6735.30 2714.42 S 4410.08 W 6032702.63 N 537157.23 E
6745.23 2717.66 S 4414.96 W 6032699.37 N 537152.37 E
6832.83 2744.30 S 4455.13 W 6032672.50 N 537112.35 E
6886.30 2758.98 S 4477.28 W 6032657.70 N 537090.28 E
6922.84 2768.36 S 4491.44 W 6032648.24 N 537076.17 E
7003.30 2787.22 S 4519.94 W 6032629.22 N 537047.78 E
7008.30 2788.31 S 4521.60 W 6032628.12 N 537046.13 E
7015.00 2789.76 S 4523.79 W 6032626.66 N 537043.95 E
7046.30 2796.32 S 4533.72 W 6032620.04 N 537034.05 E
7054.30 2797.95 S 4536.17 W 6032618.41 N 537031.61 E
7056.30 2798.35 S 4536.78 W 6032618.00 N 537031.00 E
7070.30 2801.16 S 4541.04 W 6032615.17 N 537026.76 E
7081.30 2803.36 S 4544.38 W 6032612.94 N 537023.44 E
7098.30 2806.77 S 4649.54 W 6032609.50 N 537018.29 E
7108.79 2808.88 S 4552.72 W 6032607.38 N 537015.12 E
7154.30 2818.00 S 4566.55 W 6032598.18 N 537001.35 E
7161.00 2819.35 S 4568.58 W 6032596.82 N 536999.32 E
Dogleg
Rate
('/100n)
0.000
0.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
3.000
0.000
0.000
0.000
0.000
0.000
0.000
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(fi)
4807.53
4875.20
4878.77
4947.97
5013.30
5074.58
5131.65
5134.94
5178.50
5164.35
5232.53
5259.09
5276.06
5310.22
5312.20
5314.83
5326.73
5329.67
5330.40
5335.49
5339.49
5345.68
5349.49
5366.05
5368.49
Comment
Be]in Dir ~ 3.000°/100ft:
8294.97ft IV'ID, 6347.88ft TVD
BASE HRZ
KLGM
TKUD (Top Kuparuk)
Kuparuk C
Kuparuk B
Kuparuk A
TKA3
End Dir: 9144.14ft MD,
7056.30ft TVD
TKA2
WOC
TKA1
Miluveach
Continued...
20 July, 2000. rS:f7 - 5- DrlllQuest 1.05.05
Sperry-Sun Drilling Services
Proposal Report for MPF-82 Wp3
Revised: 20 July, 2000
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(it) (it) (it) (ft) (ft)
9300.00 20.000 236.557 7161.46 7202.76 2827.72 S 4581.26 W
9400.00 20.000 236.557 7255.43 7296.73 2846.57 S 4609.80 W
9405.56 20.000 236.557 7260.65 7301.95 2847.62 S 4611.39 W
Global Coordinates Dogleg
Northings Eastings Rate
(it) (it) (°ll00ft)
6032588.37 N 536986.68 E 0,000
6032569.37 N 536958.25 E 0.000
6032568.31 N 536956.67 E 0.000
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to MPF-82. Northings and Eastings are relative to MPF-82.
Alaska State Plane 4
Milne Point MPF
Vertical
Section
(it)
5383.68
5417.87
5419.77
Comment
Total Depth: 9405.56ft MD,
7301.95ft TVD
7" Liner
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from MPF-82 and calculated along an Azimuth of 238.304° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 9405.56ff.,
The Bottom Hole Displacement is 5419.77ft., in the Direction of 238.304° (True).
Continued...
20 July, 2000 - rS:f7 - 6 - DrillQuest 1.05.05
H 172565.
VENDOR ALASKASTAT 1(
..... v~, pLml~,--lft, i'h,,.~ I rl I
__ DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
:)BO200 ;KOBO200! 100. O0 100. O0
HANDL. I: ¢0 !NST- TERR [ E X4&28
~IE A1TACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE~ I OO. O0 I OO. OD
"::':(i:'r,',::'.:~' .:q~u=v~i~o. 6.'HiO :.]'.':]..:'.. ::"::
':' '." ": i. ::':; "' :::':. ". '" ~'. :':,:; ':~ :':".:,'~':. :'.:.i ;::[:'.'
.... ]i ,'L:i,i.':ii,,' ';',:::i,:ii;!,~-a..':~?'.!:'::, !:?::'::.r..:;:?
412
., .
~.^v'.:, ONe!.. ~~:~o: i~ ~;~:~ oo****~'~~.~,.."~!.*******~~..,~. U'~"::;~o,.,_^,. .,
'"~?~:::: "'::?;;:"~?.::~:,?':: :~? ~?~:??;"' ;'~:'.'~'.::':: '":~:,~:"':'::~':::' ;.~:",;;~ :':"?;;?~."~: DATE :':~?,'~ ,.),?:;~..,.,.:,~::~,.~?,;r. ¥:;':.,~ ??~OUNT'"'"" '
~P'..:~:~h~:~`~:~j. S~ATE;:::;~:OF ALAS~A?~:,: .... ??;::'~::;b,:.' '.:?, .:~::?/?:t::: :,~::~::~::...:~::~'::~ :.:::.~:~:::.:z ..... :~,~:.~::~' "~'"1 I,m. ,~,~s :.;:::.. ' ...::.:.f.;?....... :.::'::...: '~:::'...:~.'.~: .'1
,' ], ? i~ 5r-, 5,' ':Oh i, EO~IP. qS,: O0.O.h[, ;I,q,'
w
FIELD & POOL ,;~r.~'"'2..~----/L ' ' g ann disposal para re
· N OFF SHORE
ADMINISTRATION 1. Permit fee attached .......................
2. Lease number appropriate.:;~-..~..~-..~ :./"z~-'~, y ./.~:
3. Unique well name and'number ..................
4. Well located in a defined pool .................. ,, _
5. Well located proper distance from drilling unit boundary. N
' Well located proper distance from other wells ..........
Sufficient acreage available in drilling unit ............
· If deviated, is wellbore plat included ............... fS'~i.~c): .~o,=/,~b~_5'c~_~. ~--~-~ ~,'t~ ;3~,'//~,=~,'/'/',~;~_~.~. ·
1~i Operator only elected party ...................
Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
APPR DATE 12. Permit can be issued without administrative approval ......
~ ~. / {. DO 13. Can permit be approved before 15-day wait ...........
N
ENGINEERING 14. Conductor string provided
-- . _ . , · . , . . · · . o · . . , . , · .
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to fie-in long string to surf csg .........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost ....... ~T~ NN
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved... ' "
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
· 25· BOPEs, do they.meet.'.regulation ...............
_.~ ~. _/.,~ 26. BOPE press rafing appropriate; test to ,~C~C~t~"~ I~sig:
27. Choke manifold complies w/APl RP-53 (May 84) .... ~ . . .
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
__
GEOLOGY 30. Permit can be issued wlo hydrogen sulfide measures ..... [ ~ N _"
.31· Data presented on potential overpressure zones .......
32. Seismic analysis of shallow gas zones .......... '""'~'""~[
,~ DATE 33. Seabed condition survey (if.off-shore) ........ ~. ~i'~ Y N
~0o 34. Contact name/phone for weekly progress reports~ploratory only] Y N
ANNULAR DISPOSAl_35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; ....... Y 'N
APPR DATE (B) will not contaminate freshwater; or cause drilling waste .... Y N
to surface;
(c) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
will not circumvent 20 AAC 25.252 or 20 AAC 25·412. Y N
~ ENGINEERING: ~ COMMISSION:
N
N .
Y N"
Comments/Instructions:
c:Vnsofflce~wordian~liana~hecklist (rev. 02/17100)
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation. information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Wed Apr 25 10:03:15 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MWD RUN 1
AK-MM-00158
J. FOLEY
J. PYRON
MPF-82PB1
500292297170
BP Exploration, Alaska
Sperry Sun
24-APR-01
6
13N
10E
1991
3010
.00
42.15
.00
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. THIS WELLBORE WAS ABANDONED FOLLOWING AN INADVERTENT
SIDETRACK AT
2334' MD, 2179' TVD DURING MWD RUN 1.
4. MWD RUN 1 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING
GEIGER-MUELLER TUBES.
5. DEPTH SHIFTING IS WAIVED PER THE E-MAIL OF
11/08/2000 FROM D. DOUGLAS
OF BP EXPLORATION (ALASKA) INC. LOG AND HEADER DATA
RETAIN ORIGINAL
DRILLER'S DEPTH REFERENCE.
6. MWD RUN 1 REPRESENTS THE MWD DATA FOR WELL MPF-82PB1
WITH API% 50-029-
22971~70. THIS WELLBORE REACHED A TOTAL DEPTH (TD)
OF 3846' MD, 3171' TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING
SGRC = SMOOTHED GAMMA RAY COMBINED
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 42.0 3808.0
ROP 92.0 3846.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 42.0 3846.0
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT. FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
First
Last
Name Service Unit Min Max Mean Nsam Reading
Reading
DEPT FT 42 3846 1944 7609 42
3846
ROP MWD FT/H 0 521.17 161.935 7509 92
3846
GR MWD API 17.61 134.88 66.5231 7533 42
3808
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 3846
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 42.0
ROP 92.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
3808.0
3846.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA,
OPEN HOLE' BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
28-AUG-00
Insite
5.46
Real-Time
3846.0
.2
53.0
TOOL NUMBER
PB01530CGV8
12.250
Water Based
9.20
77.0
40.0
400
6.0
.000
.000
.000
.000
.0
83.0
.0
.0
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units SiZe Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Last
Name Service Unit Min Max Mean Nsam
Reading
DEPT FT 42 3846 1944 7609
3846
ROP MWD010 FT/H 0 521.17 161.935 7509
3846
GR MWD010 API 17.61 134.88 66.5231 7533
3808
First
Reading
42
92
42
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 3846
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ...... . ..... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Scientific
Scientific
Physical EOF
Physical EOF
End Of LIS File
c bb-lc 5
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Wed Apr 25 09:48:18 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ............. 'STS LIS Writing Library. Scientific
Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MPF-82i
500292297100
BP Exploration, Alaska
Sperry Sun
24-APR-01
MWD RUN 1 MWD RUN 2 MWD RUN 3
AK-MM-00158 AK-MM-00158 AK-MM-00158
J. FOLEY J. FOLEY J. FOLEY
J. PYRON J. 'PYRON E. VAUGHN
6
13N
10E
1991
3010
.O0
42.15
.00
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 5310.0
8.500 7.000 9440.0
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. THIS WELL KICKS OFF (INADVERTENT SIDETRACK) FROM
MPF-82PB1
AT 2334' MD, 2179' TVD. MPF-82PB1 IS PRESENTED
SEPARATELY.
4. MWD RUNS 1-2 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBES.
5. MWD RUN 3 IS DIRECTIONAL WITH DGR AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4).
6. DEPTH SHIFTING IS WAIVED PER THE E-MAIL OF
11/08/2000 FROM D. DOUGLAS
OF BP EXPLORATION (ALASKA) INC. LOG AND HEADER DATA
RETAIN ORIGINAL
DRILLER'S DEPTH REFERENCE.
7. MWD RUN 1 THROUGH 2334' MD AND MWD RUNS 2-3
REPRESENT THE MWD DATA
FOR WELL MPF-82 WITH API% 50-029-22971-00. THIS
WELL REACHED
A TOTAL DEPTH (TD) OF 9440' MD, 7327' TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING)
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING)
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 42.0 9376.0
ROP 92.0 9440.5
FET 5271.5 9385.5
RPD 5271.5 9385.5
RPM 5271.5 9385.5
RPX 5271.5 9385.5
RPX 5271.5 9385.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 42.0 2334.0
2 2334.5 5325.5
3 5271.5 9440.5
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DE?T FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Last
Name Service Unit Min Max Mean Nsam
First
Reading
Reading
DEPT FT 42 9440.5
9440.5
ROP MWD FT/H 0 2358.51
9440.5
GR MWD API 17.61 313.61
9376
RPX MWD OHMM 0.9 1118.61
9385.5
RPS MWD OHMM 0.79 1263.65
9385.5
R?M MWD OHMM 0.8 1757.37
9385.5
RPD MWD OHMM 0.79 2000
9385.5
FET MWD HOUR 0.3171 51.0182
9385.5
4741.25 18798
145.458 18698
88.3809 18669
2.99492 8229
3.22748 8229
3.59174 8229
17.3324 8229
1.51327 8229
42
92
42
5271.5
5271.5
5271.5
5271.5
5271.5
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 9440.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT:
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
LOG HEADER DATA
DATE LOGGED:
.5000
START DEPTH STOP DEPTH
42.0 .2334.0
92.0 2334.0
28-AUG-00
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ............... '..Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Insite
5.46
Real-Time
2334.0
.2
53.0
TOOL NUMBER
PB01530CGV8
12.250
Water Based
9.20
77.0
40.0
400
6.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
.0
83.0
.0
.0
Last
Name Service Unit Min Max
Reading
DEPT FT 42 2334
2334
ROP MWD010 FT/H 0 475.06
2334
GR MWD010 API 17.61 124.98
2334
Mean Nsam
1188 4585
149.41 4485
63.4261 4585
First
Reading
42
92
42
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 2334
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ........ 01/04/25
Maximum Physical Record..65535
File Type ................ 'LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
ROP 2334.5 5325.5
GR 2334.5 5287.0
$
LOG HEADER DATA
DATE LOGGED: 30-AUG-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): Real-Time
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
5325.0
.2
53.0
TOOL NUMBER
PB01530CGV8
12.250
Water Based
9.20
77.0
40.0
400
5.5
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
.0
87.0
.0
.0
First
Last
Name Service Unit Min Max
Reading
DEPT FT 2334.5 5325.5
5325.5
ROP MWD020 FT/H 1.05 2358.51
5325.5
GR MWD020 API 18.42 136.59
5287
Mean Nsam
3830 5983
179.077 5983
74.6297 5906
Reading
2334.5
2334.5
2334.5
First Reading For Entire File .......... 2334.5
Last Reading For Entire File ........... 5325.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
RPD 527i.5 9385.5
RPM 5271.5 9385.5
RPS 5271.5 9385.5
RPX 5271.5 9385.5
FET 5271.5 9385.5
GR 5287.5 9376.0
ROP 5326.0 9440.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
04-AUG-00
Insite
65.41
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction .......... , ....... Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Real-Time
9440.0
22.5
48.1
TOOL NUMBER
PB01625PM6
PB01625PM6
8.500
LSND
9.60
52.0
9.6
400
4.8
1.900
1.019
3.200
1.350
71.0
138.2
71.0
71.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68
RPD MWD030 OHMM 4 1 68
FET MWD030 HOUR 4 1 68
20
24
28
Last
Name Service Unit Min Max
Reading
DE?T FT 5271.5 9440.5
9440.5
ROP MWD030 FT/H 6 272.95
9440.5
GR MWD030 API 36 313.61
9376
RPX MWD030 OHMM 0.9 1118.61
9385.5
RPS MWD030 OHMM 0.79 1263.65
9385.5
RPM MWD030 OHMM 0.8 1757.37
9385.5
RPD MWD030 OHMM 0.79 2000
9385.5
FET MWD030 HOUR 0.3171 51.0182
9385.5
Mean
7356
118.863
112.303
2.99492
3.22748
3.59174
17.3324
1.51327
Nsam
8339
8230
8178
8229
8229
8229
8229
8229
First
Reading
5271.5
5326
5287.5
5271.5
5271.5
5271.5
5271.5
5271.5
First Reading For Entire File .......... 5271.5
Last Reading For Entire File ........... 9440.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name,..
Version Number ........... 1.0.0
Date of Generation ....... 01/04/25
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Technical Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/04/25
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Scientific
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific
Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Thu Jun 07 10:46:54 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE ~EADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
MPF-82i
500292297100
BP Exploration, Alaska
Sperry Sun
07-JUN-01
MWD RUN 1 MWD RUN 2 MWD RUN 3
AK-MM-00158 AK-MM-00158 AK-MM-00158
J. FOLEY J. FOLEY J. FOLEY
J. PYRON J. PYRON E. VAUGHN
6
13N
10E
1991
3010
.00
42.15
.00
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 2234.0
12.250 5325.0
8.500 9440.0
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 42.0
ROP 92.0
FET 5271.5
RPD 5271.5
RPM 5271.5
RPX 5271.5
RPX 5271.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
STOP DEPTH
9376 0
9440 5
9385 5
9385 5
9385 5
9385 5
9385 5
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 42.0 2334.0
2 2334.5 5325.5
3 5271.5 9440.5
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Order Units Size Nsam
FT 4 1 68
MWD FT/H 4 1 68
MWD API 4 1 68
MWD OHMM 4 1 '68
MWD OHMM 4 1 68
MWD OHMM 4 1 68
MWD OHMM 4 1 68
MWD HOUR 4 1 68
Rep Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
Name Service Unit Min Max
DEPT FT 42 9440.5
ROP MWD FT/H 0 2358.51
GR MWD A?I 17.61 313.61
RPX MWD OHMM 0.9 1118.61
RPS MWD OHMM 0.79 1263.65
RPM MWD OHMM 0.8 1757.37
RPD MWD OHMM 0.79 2000
FET MWD HOUR 0.3171 51.0182
Mean Nsam
4741.25 18798
145.458 18698
88.3809 18669
2.99492 8229
3.22748 8229
3.59174 8229
17.3324 8229
1.51327 8229
First
Reading
42
92
42
5271.5
5271.5
5271.5
5271.5
5271.5
Last
Reading
9440.5
9440.5
9376
9385.5
9385.5
9385.5
9385.5
9385.5
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 9440.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ............ 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 42.0
ROP 92.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
2334.0
2334.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
28-AUG-00
Insite
5.46
Memory
2234.0
.2
53.0
TOOL NUMBER
PB01530CGV8
12,250
Water Based
9.20
77.0
40.0
400
6.0
.000
.000
.000
,000
.0
83.0
.0
.0
Absent value ....................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 42 2334 1188 4585
ROP MWD010 FT/H 0 475.06 149.41 4485
GR MWD010 API 17.61 124.98 63.4261 4585
First
Reading
42
92
42
Last
Reading
2334
2334
2334
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 2334
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
ROP 2334.5
GR 2334.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
STOP DEPTH
5325.5
5287.0
30-AUG-00
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Insite
5.46
Memory
5325.0
.2
53.0
TOOL NUMBER
PB01530CGV8
12.250
Water Based
9.20
77.0
40.0
400
5.5
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
.0
87.0
.0
.0
Name Service Unit Min Max
DEPT FT 2334.5 5325.5
RO? MWD020 FT/H 1.05 2358.51
GR MWD020 API 18.42 136.59
Mean Nsam
3830 5983
179.077 5983
74.6297 5906
First
Reading
2334.5
2334.5
2334.5
Last
Reading
5325.5
5325.5
5287
First Reading For Entire File .......... 2334.5
Last Reading For Entire File ........... 5325.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
RPD 5271.5 9385.5
RPM 5271.5 9385.5
RPS 5271.5 9385.5
RPX 5271.5 9385.5
FET 5271.5 9385.5
GR 5287.5 9376.0
ROP 5326.0 9440.5
,$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
04-SEP-00
Insite
65.41
Memory
9440.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data. Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units ............. ~ .........
Datum Specification Block sub-type...0
22.5
48.1
TOOL NUMBER
PB01625PM6
PB01625PM6
12.250
LSND
9.60
52.0
9.6
400
4.8
1.900
1.019
3.200
1.350
71.0
138.2
71.0
71.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
R?X MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68
28
Name Service Unit Min Max
DEPT FT 5271.5 9440.5
ROP MWD030 FT/H 6 272.95
GR MWD030 API 36 313.61
RPX MWD030 OHMM 0.9 1118.61
RPS MWD030 OHMM 0.79 1263.65
RPM MWD030 OHMM 0.8 1757.37
RPD MWD030 OHMM 0.79 2000
FET MWD030 HOUR 0.3171 51.0182
First Last
Mean Nsam Reading Reading
7356 8339 5271.5 9440.5
118.863 8230 5326 9440.5
112.303 8178 5287.5 9376
2.99492 8229 5271.5 9385.5
3.22748 8229 5271.5 9385.5
3.59174 8229 5271.5 9385.5
17.3324 8229 5271.5 9385.5
1.51327 8229 5271.5 9385.5
First Reading For Entire File .......... 5271.5
Last Reading For Entire File ........... 9440.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
12,$
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Thu Jun 07 11:40:18 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
.MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MWD RUN 1
AK-MM-00158
J. FOLEY
J. PYRON
MPF-82PB1
500292297170
BP Exploration, Alaska
Sperry Sun
07-JUN-01
6
13N
10E
1991
3010
.00
42.15
.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 12.250 3846.0
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. THIS WELLBORE WAS ABANDONED FOLLOWING AN INADVERTENT
SIDETRACK AT
2334' MD, 2179' TVD DURING MWD RUN 1.
4. MWD RUN 1 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING
GEIGER-MUELLER TUBES.
5. DEPTH SHIFTING IS WAIVED PER THE E-MAIL OF
11/08/2000 FROM D. DOUGLAS
OF BP EXPLORATION (ALASKA) INC. LOG AND HEADER DATA
RETAIN ORIGINAL
DRILLER'S DEPTH REFERENCE.
6. MWD RUN 1 REPRESENTS THE MWD DATA FOR WELL MPF-82PB1
WITH API% 50-029-22971-
THIS WELLBORE REACHED A TOTAL DEPTH (TD) OF 3846' MD,
3171' TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING
SGRC = SMOOTHED GAMMA RAY COMBINED
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Previous. File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 42.0 3808.0
ROP 92.0 3846.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
EQUIVALENT UNSHIFTED DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
BIT RUN NO MERGE TOP MERGE BASE
1 42.0 3846.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DE?T FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
First
Name Service Unit Min Max Mean Nsam Reading
DEPT FT 42 3846 1944 7609 42
ROP MWD FT/H 0 521.17 161.935 7509 92
GR MWD API 17.61 134.88 66.5231 7533 42
Last
Reading
3846
3846
3808
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 3846
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 42.0
ROP 92.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
3808.0
3846.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
28-AUG-00
Insite
5.46
Memory
3846.5
.2
53.0
TOOL NUMBER
PB01530CGV8
12.250
Water Based
9.20
77.0
40.0
400
6.0
.000
.000
.000
.000
.0
83.0
.0
.0
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DE?T FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 42 3846 1944 7609
ROP MWD010 FT/H 0 521.17 161.935 7509
GR MWD010 API 17.61 134.88 66.5231 7533
First Last
Reading Reading
42 3846
92 3846
42 3808
First Reading For Entire File .......... 42
Last Reading For Entire File ........... 3846
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/06/07
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
Tape Trailer
Service name .............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/06/07
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel. Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File