HomeMy WebLinkAbout198-162 STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well Classification of Service Well
I"1 Oil [] Gas [] Suspended [] Abandoned [] Service
"~, ~ ':~"~'Y'F' ~ ~'i'~ '~"~ ~ ·, ~
· ' ."'?r' '~' ",~ ,' '.~'" ~..~ ';
2. Name of Operator .~.~;-.--'-.~;'~-~:.',,~.,;':~.~ 7. Permit Number
BP Exploration (Alaska) Inc. '.~ ..~!~,'~ =, 198-162 '~' 302-278
3. Address'~...~.'>: ,' =~:~..~;'!' 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~'..;'~~:! 50-029-21559-01
'1' ~"11 '
4. Location of well at surface ' 9. Unit or Lease Name
1700' SNL, 883' WEL, SEC. 19, T11N, R14E,UM X = 664506, Y = 5959522 Prudhoe Bay Unit
At top of productive interval
2554' SNL, 4027' NWL, SEC. 20, T11N, R14E, UM X = 669436, Y = 5958778
At total depth 10. Well Number
2357' SNL, 415' NWL, SEC. 21 T11N, R14E, UM X = 671098, Y = 5959012 C-32A
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 65.3' ADL 028306
12. Date Spudded9/8/98 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'9/14/90 ,1/22/2002 115' Water depth' if °ffsh°reN/A MSL 110' N°' °f c°mpleti°nszero
"17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost
12268 8984 FTI 12268 8984 FTI [] Yes [] NoI N/A MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, ROP
23. CASING~ LINER AND CEMENTING RECORD
CASING SE'r'rING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" Insulated Conductor Surface 110' 26" 8 cu yds concrete
13-3/8" 723 L-80 Surface 2904' 17-1/2" 4074 cu ft Cold Set II
9-5/8" 47# L-80 Surface 9665' 12-1/4" 570 cuff Class 'G'
7" 29# L-80 9411' 10082' 8-1/2" 375 cuft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD)
None .,., : ,..,. 4-1/2", 12.6#, L-80 9269'- 9419' 9317'
,
MD TVD MD TVD
..: 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
" 9345' Set EZ Drill Squeeze Packer
·
9345' P&A with 48 Bbls Class 'G',
, '.;
' ' Sqz to 850 psi
,
9269' Set Whipstock
27. PRODUCTION TEST
Date First Production " Method of Operation (Flowing, gas lift, etc.)
Not on Production .' N/A . ..
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
~low Tubing Casing Pressure CALCULATED OIL'BBL GAS-MCF WATER-BeE OIL GRAVITY-APl (CORR)
Press. ~ 24-HOUR RATE
2~. CORE DATA ~ ~ ~ ~ i[
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chi~~ I~, ! V
No core samples were taken. MAR I 1 2005
AJaska ~ & Gas Cons.
'~" ' ., ~::i..'~ ~
'. ..... , ..... !{ ..J ,, .~ i!. .......
..,
Form 10-407 Rev. 07-01-80 Submit In Duplicate
. ,
29. Geologic Markers 30. Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered and
Depth Depth gravity, GOR, and time of each phase.
Zone I 10475' 8967'
Zone I 11653' 8950'
Zone I 11844' 8944'
31. List of Attachments: Summ. ary of P,,re.-Rig Work and Daily Drilling Reports
32. I hereby certify that the fore, going is true and correct to the best of my knowledge
Signed TerrieHubble""~r[,~~ ~_]~~__~ Title TechnicalAssistant Date
C-32A .... 198-162 302-278 Prepared By Name/Numbec Terrie Hubble, 564-4628
Well Number . Permit No. / Approval No. Drilling Engineer: Michael Trfolo, 564-5774
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1 -' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
',
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
, ,,
Well: C-32B Accept: 01/22/03
Field: Prudhoe Bay Unit Spud: 01/26/03
APl: 50-029-21559-02 Release: 02/06/03
Permit: 202-246 Rig: Nabors 2ES
Date
PRE-RIG WORK
09/08/02
MITOA TO 2000 PSI (PASSED).
09122/02
TIO = SI/400/75. PPPOT-T PASSED, PPPOT-IC FAILED (PRE-RIG). PRESSURED TUBING HANGER TEST
PORT TO 5000 PSI, LOST 300 PSI IN 30 MINUTES. TORQUED LDS TO 450 FT-LBS, ALL FUNCTIONED OKAY.
PPPOT-IC FAILED, TEST PORT IS FILLED WITH PLASTIC. UNABLE TO GET TEST PORT PRESSURE ABOVE
1500 PSI, WOULD BLEED RIGHT BACK TO 400 PSI. TORQUED LDS TO 450 FT-LBS, ALL FUNCTIONED
OKAY.
11/17102
HIT OBSTRUCTION @ SSSV. CHASE OUT TUBING TAIL, TAG FISH @ 9584' SLM. DRIFT W/3.705 CENT TO
FISH @ 9584'. JOB IN PROGRESS.
11/18/02
DRIFT W/3.705 CENT TO FISH @ 9584' SLM. TUBING CLEAR. (PRE-RIG). NOTIFY PAD OPERATOR.
11122/02
SET HALLIBURTON 4-1/2" EZ DRILL SV SQUEEZE PACKER AT 9345'. REFERENCED TO SLB CBL LOG
DATED 3/29/1986. SAT DOWN ON EZSV AFTER SET TO VERIFY POSITION. PAD OPERATOR NOTIFIED
WELL LEFT SHUT IN.
12/07102
CEMENT P & A. BLEED WELL DOWN TO TIGER, RIH WITH EZSV STINGER.
12/08102
WELL BLED DOWN TO 0 PSI, RIH WITH 4 1/2" EZSV STING IN TOOL TO 9300', LOAD TUBING WITH 2% KCL....
,S,,T, AB INTO RETAINER AND ESTABLISH INJECTIO.,N, INTO FORMATION. PUMJ~ 48 BBLS OF 15.8 PPG CLASS
G CEMENT BELOW RETAINER. FINAL "SQUEEZE PRESSURE = 850 PSIG.'"LINSTING FROM RETAINER.
WASH TOP OF RETAINER WITH BIOZAN AND CHASE OUT OF HOLE. FP TUBING TO2000' WITH 60/40
METHANOL. SECURE WELL. WELL TO REMAIN SHUT-IN. JOB COMPLETE.
12/09/02
T/I/O=0+/290/250 IA FL AT 4800' (257 BBLS) (FOR E-LINE).
12/10/02
LOAD IA W/DEAD CRUDE. PUMPED 246 BBLS DEAD CRUDE DWN IA, STOPPED PUMPING WHEN
PRESSURE BEGAN CLIMBING. LEFT WELL SHUT IN.
CUT TUBING @ 9275' MD WITH 3-5/8" CHEMICAL CUTTER. TAGGED TD @ 9340 FT. MD. TUBING PUNCH AT
9285'-9287', TOOLSTRING - HEAD/2-WEIGHTS/CCL/MPD/GUN/BOWSPRING-BTM-NOSE. MAX OD = 1.69",
TOOL LENGTH = 27 FT. RIH W/STRING-SHOT TOOLSTRING - HEAD/2-WEIGHTS/CCL/MPD/SAFE/
STRINGSHOT. MAX OD = 1.69", TOOL LENGTH = 31.5 FT. LAST, RIH W/CHEMICAL CUTTER TOOLSTRING -
HEAD/2-WEIGHTS/CCL/CHEM-CUTTER. MAX OD = 3.625", TOOL LENGTH = 32 FT. WELL SHUT IN.
12/12/02
PUMP 1074 BBLS SEA WATER, 152 BBLS DIESEL, 20 BBLS NEAT MEOH TOTAL FOR WELL CIRC-OUT.
BP EXPLORATION Page 1
Operations Summa Report
Legal Well Name: C-32
Common Well Name: C-32 Spud Date: 3/3/1986
Event Name: REENTER+COMPLETE Start: 1/22/2003 End: 2/6/2003
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/6/2003
Rig Name: NABORS 2ES Rig Number:
, .
Date '.'Fr0m'_ -~_To HoUrs Task Code NPT ·Phase '.DeSCr~iPtion of
Operations,'
·
1/21/2003 10:00- 18:00 8.00 MOB P PRE Blow down lines. R/U, lower derrick, move rig off well.
Spot sub base in open section of pad. R/U to move camp,
shop, and pit module to C-pad.
18:00 - 20:30 2.50 MOB P PRE Move camp, shop, and pit module from Y-35A to C-pad. Stage
;at North entrance to pad while 'Roads and Pads' continue to
clear snow build up and prep well site.
Begin moving substructure from Ypad to spine road at GC-2.
20:30 - 00:00 3.50 MOB P PRE Rig substructure on access road between GC-2 and the spine
road. CPS and security monitored rig travel by GC-2 high lines
and culvert crossings. No incidents.
1/22/2003 00:00 - 03:00 3.00 MOB P PRE Move sub from GC2 to upper section of C Pad.
03:00 - 06:00 3.00 MOB P . PRE Raise & pin derrick. RU Top Drive, hang bridal lines. Pin
beaver slide.
Roads & Pads complete snow removal. Level pad around well
head. Prepare site.
06:00 - 07:00 1.00 MOB P PRE Lay rig mats, spread 'Herculite'
07:00 - 14:30 7.50 MOB P PRE Move camp & pits to lower section of C pad. MIRU
substructure on C 32B. Spot mud pits, shop & camp. Berm in
cellar & cuttings tank. Connect service lines. Accept rig ~
1430 hrs 01122/2003
14:30 - 15:30 1.00 RIGU P PRE NU secondary annulus valve on well head. Check IA and
tubing pressure ~ 0 psi.
15:30 - 16:00 0.50 RIGU P PRE Pre spud meeting with all personel. Review 'Prespud Check
list'. Post 'Permit to Drill' in dog house.
16:00 - 17:00 1.00 WHSUR P DECOMP RU DSM lubricator. Pull BPV. RD DSM.
17:00 - 18:00 1.00 CLEAN P DECOMP RU circ lines & test same.
18:00 - 21:30 3.50 CLEAN P DECOMP Reverse circulate diesel from tubing. Swap lines and pump
'Safe Kleen' sweep and displace diesel from annulus at 5 bpm,
500 psi.
21:30 - 22:00 0.50 CLEAN P DECOMP Install TWC. Test from below 1000 psi.
22:00 - 23:30 1.50 WHSUR P DECOMP ND tree and adapter flange, checked tubi;tg hanger threads,
Checked XO in hanger. Function lock down screws.
23:30 - 00:00 0.50 BOPSUI:; P DECOMP NU BOPE
1/23/2003 00:00 - 02:30 2.50 BOPSUF; P DECOMP Finish NU BOPE. Install riser & mousehole. PU test jt.
02:30 - 05:30 3.00 BOPSUI; P DECOMP Test BOP, floor valves, choke manifold, IBOP valve to BP &
AOGCC regs ~ 250 psi Iow 13500 psi high. Witness of test
!waived by John Crisp of the AOGCC.
05:30 - 06:00 0.50 BOPSUF; P DECOMP LD test jt and associated equipment.
06:00 - 07:00 1.00 WHSUR P DECOMP RU DSM lubricator. Pull TWC. RD DSM.
07:00 - 08:30 1.50 WHSUR P DECOMP BOLDS, replace I LDS. RU tongs & CAMCO control line
spooling unit for SSSV.
08:30 - 09:00 0.50 PULL P DECOMP MU landing jt. Unseat tbg hanger wi 110k, con't pull to 170k.
Tbg free wi string wt of 140k.
09:00 - 10:00 1.00 PULL P DECOMP Circ well ~ 5 BPM 1260 psi. Pump dry job.
10:00 - 10:30 0.50 PULL P DECOMP Pull hanger to floor. LD landing jt & tbg hanger
Printed: 2/10/2003 11:18:40 AM
BP EXPLORATION Page 2 ~
Operations Summa Report
Legal Well Name: C-32
Common Well Name: C-32 Spud Date: 3/3/1986
Event Name: REENTER+COMPLETE Start: 1/22/2003 End: 2/6/2003
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/6/2003
Rig Name: NABORS 2ES Rig Number:
· .
.
Date FrOm - TO Hours,. :Task' Code' NPT 'Phase. DeS¢'ription of:OPerations
: ..
....
1/23/2003 10:30 - 14:00 3.50 PULL P DECOMP POH LD 4 1/2" tbg, spooling dual control line to SSSV @
2231'. LD SSSV & RD spooling equipment.
Recover 29 clamps, 29 SS pins, 3 SS bands.
14:00 - 21:30 7.50 PULL P DECOMP Con't POH LD 4 1/2" tbg. Total 230 its & 17.95' cut off. Smooth
cut.
Recover 6 GLM's & SSD.
21:00 - 23:00 2.00 WHSUR P DECOMP RD tbg handling equip. BOLDS on SOW. MU 9 5/8" pack off
retrieving tool. Engage 9 518" pack off, unseat same wi 5k. LD
pack off.
23:00 - 00:00 1.00 WHSUR P DECOMP MU new 9 5/8" pack off. Attempt to seat same. Tagging up mid
way thru tbg spool. (See remarks)
1/24/2003 00:00 - 01:00 1.00 CLEAN P DECOMP LD pack off running tool. Clear rig floor, RU for BI-IA.
01:00 - 03:00 2.00 CLEAN P i DECOMP Load pipe shed w/BHA. SLM & caliper same. Take on 450
bbls 10.5 ppg LSND mud.
03:00 - 05:00 2.00 CLEAN P ;DECOMP PU & RIH to 1011' wi 8 112" milling BHA from pipe shed. P/U
Wt 80K SlO Wt 80k
05:00 - 06:00 1.00 CLEAN P DECOMP MU 9 5~8" RTTS pkr wi Storm valve, set same ~ 32'. POH &
rack running tool.
06:00 - 14:30 8.50 WHSUR P DECOMP ND riser, & BOP. Rack back BOP. Inspect tbg spool - no good.
(see remarks) ND tbg spool. Remove secondary annulus
valve. Clean & inspect csg head. NU new tbg spool. Install new
pack off. Test pack off I tbg spool 5000 psi O-K. MU secondary
annulus valve on new tbg spool. NU BOP & riser.
14:30- 15:00 0.50' WHSUB P DECOMP Install wear bushing
15:00 - 16:00 1.00 BOPSUF P DECOMP RIH wi retrieving tool for 9 5/8" RTTS pkr. Engage & release
pkr. Ciro well to verify pkr elements released.
16:00 - 17:00 1.001 BOPSUF P DECOMP Test lower pipe rams & flange connection to 250 psi Iow / 3500
psi high as per BP & AOGCC regs. Test 9 5/8" casing to 3500
psi 130 rains. (change 1 LDS gland packing on tbg spool)
17:00-18:00 1.00: CLEAN P DECOMP POHw/95/8"RTTSpkr. LDsame.
18:00 - 00:00 6.00 CLEAN P DECOMP Con't RIH w/8 112' mill assy on 4" DP from pipe shed to 9260
f. P/U Wt 225k, SlO Wt 155k
1125/2003 00:00- 00:30 0.50 CLEAN P DECOMP Tag 4 1/2" tbg stump ~ 9269 ft.
00:30 - 01:30 1.00 CLEAN P ~DECOMP Displace well w/10.5 ppg LSND mud @ 12 BPM - Starting
pressure 1700 psi ending pressure 1450 psi. Rotate and
reciprocate pipe during displacement. PIU Wt 225k, SlO Wt
155k, Rot Wt 195k
01:30- 02:30 1.00 CLEAN P DECOMP Slip & cut drlg line.
02:30 - 03:00 0.50 CLEAN P DECOMP Service TDS. Clean out sand traps. Pump dry job.
03:00-05:30 2.50 CLEAN P DECOMP POHwl8 1/2"millassytoBHA@ 1011 ft
05:30 - 06:30 1,00 CLEAN P DECOMP Rack back BHA. Inspect & ensure mills showing no damage.
06:30 - 07:00 0.50 CLEAN P DECOMP Clear rig floor. Prepare to PU whip stock I MWD.
07:00 - 10:30 3.50 STWHIP P WEXlT MU 9 518" whipstock, MWD & BHA. RIH to 1079 ft. Surface
test MWD O-K.
10:30 - 15:00 4.50 STWHIP P WEXlT Con't RIH wi 9 58" whipstock assy @ controlled running speed
to 9170 fi,
15:00- 16:00 1.00 STWHIP P WEXlT Establish operating parameters, obtain SPR's. Orient
whipstock to 87 deg Left of high side. Lower whip stock & tag
tbg stump @ 9269 ft. Set anchor w/20k, comfirm set w/5k
over pull. Check orientation O-K. Slack off & shear lug bolt wi
45k.
Note: Top of window @ 9246 ft, Btm of window 9264 ft.
16:00 - 00:00 8.00 STWHIP. P WEXlT Mill 8 1/2" window from 9246 to 9273 ft. P/U Wt 210k, S/O Wt
Printed: 2/10/2003 11:18:40 AM
BP EXPLORATION Page 3
Operations Summa Report
Legal Well Name: C-32
Common Well Name: C-32 Spud Date: 3/3/1986
i Event Name: REENTER+COMPLETE Start: 1/22/2003 End: 2/6/2003
'Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/6/2003
Rig Name: NABORS 2ES Rig Number:
Date"" .From -'To 'HOurs TaSk :code..! 'NPT Phase Description of Operations
, .
1/2512003 16:00 - 00:00 8.00 STWHIP :~ WEXlT 155k, Rot Wt 170k TQ 8,000 - 9,000, Pump rate 525 GPM
2550 psi
(start of window TQ 8,000 - 14,000)
112612003 00:00 - 03:30 3.50 STWHIP :) WEXlT Mill 8 112" window from 9273 ft to 9285 ft. PIU Wt 210k, SIO
.Wt 155k, Rot Wt 170k TQ 8,000 - 9,000, Pump rate 525 GPM
~ 2550 psi
Top of window 9246 ft
Btm of window 9264 fi
8" hole 9272 ft to 9285 ft
8 112" hole 9246 ft to 9272 ft
Total of 160 lbs metal recovered.
03:30 - 04:00 0.50 STWHIP P WEXlT Circ hole and make several passes thru window w/mills,
pumps on and off. Smooth window. Pull into 9 5~8" casing.
04:00 - 04:30 0.50 STWHIP P WEXIT Perform FIT as per BP regs. Top of window ~ MD 9246 ft,
TVD 8015 ft.
MW 10.50 ppg, surface pressure 835 psi, FIT {~ EMW 12.5
PPg
04:30 - 07:00 2.50 STWHIP P WEXlT Pump dry job. POH w/8 1/2" milling assy to BHA
07:00 - 09:00 2.00 STWHIP P WEXIT Rack back HWDP, LD steel DC's. Inspect upper window mill
full gauge.
09:00 - 10:30 1.50 BOPSUF P INT1 Clear rig floor. Pull wear bushing. Flush BOP's. Install wear
bushing.
10:30 - 12:30 2.00! DRILL P INT1 PU 8 112" °S 73' PDC bit, 7" MM set @ 1.22 degree, MWD,
monels, jars and RIH on 5" HWDP to 909 ft. Surface test MWD
O-K.
12:30 - 14:30 2.00: DRILL P INT1 Con't RIH wi 8 112" bit. PU 21 jts 4" Dp from pipe shed. Orient
thru window ~ 9246 fi to 9269 ft. Ream 8" hole 9277 ft to 9285
ff.
_ No problems thru window.
14:30 - 00:00 9.501 DRILL P INT1 Drill 8 112" directional I~ole 9285 ft to 9496 it thru the Kingak
shale.
Pump rate 526 GPM, On Btm 3290 psi, Off Btm 29~,88~si. Rot
80 RPM, TQ on btm 9,000, TQ off btm 8,000~Pf13 Wt 200k,
SlO Wt 145k, Rot Wt 170k
Slide 139 ft wi 165 - 170 TF No~,o151ems Sliding
Avg ROP slide 39 fi/hr
Rotate 114ft ~
Avg ROP rota~,e,~r8 fi/hr
AST= 3~J:tm~, ART= I hrs
TJ MD 9318 fi TVD 8080 ft
,JB ~ MD 9485 fi TVD 8235 ft .
1/2712003 00:00 - 05:00 5.00i DRILL !P ~ I~T"'~ Drill 8 112" directional hole 9496 ft to hole section TD {~ 9678 ft
in Top of Sag River
J Pump rate 526 GPM, On Btm 3290 psi, Off Btm 2980 psi, Rot
J 80 RPM. TQ on btm 9,000. TQ off btm 8,000. PIU Wt 200k,
SIO Wt 145k, Rot Wt 170k.
j Slide 53 ft wi 160 TF. No problems sliding
^vg ROP sliding 37 fi/hr
Rotate 87 ft
^vg ROP rotate 87 fi/hr
j AST= 1.5 hrs, ART= 1 hrs.
Printed: 2110/2003 11:18:40 AM
(' STATE OF ALASKA ( ~ 9 [~t/~
ALASKA OIL AND GAS CONSERVATION COMMISSION ¢ 2-~,1~.. ~... ~
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate iOJ ~ ~.~
~ I
2. Name of Operator 5. Type of well: 6. Datum Elevation (~F or KB)
BP Exploration (Alaska) Inc. I~! Development KBE = 65.30'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Prudhoe Bay Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
8. Well Number
4. Location of well at surface C-32A
1700' SNL, 883' WEL, SEC. 19, T11N, R14E,UM 9. Permit Number
At top of productive interval 198-162
2554' SNL, 4027' EWL, SEC. 20, T11N, R14E, UM 10. APl Number
At effective depth 50- 029-21559-01
2357' SNL, 415' EWL, SEC. 21 T11N, R14E, UM' 11. Field and Pool
At total depth Prudhoe Bay Field / Prudhoe
2357' SNL, 415' EWL, SEC. 21 T11N, R14E, UM Bay Pool
12. Present well condition summary
Total depth: measured 12268 feet Plugs (measured)
true vertical 8984 feet
Effective depth: measured 12268 feet Junk (measured) See Diagram - BHA left in hole at about 9573' (09/98)
true vertical 8984 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 110' 20" 8 cu yds Concrete 110' 110'
Surface 2904' 13-3/8" 4074 cu ft Cold Set II 2904' 2712'
Intermediate 9665' 9-5/8" 570 cu ft Class 'G' 9665' 8392'
Production
Liner 671' 7" 375 cu ft Class 'G' 9411' - 10082' 8163' - 8767'
(Top of Window)
Perforation depth: measured None ,.,.! ~'~ .... ~.,._. ~ ~ ,!' ,., ....
true vertical None
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 9419' ,~asi~'~ Oi~ ,~,~ ~.:;~..~.~,...,.~:,!",~,.;.~; L.~.~,~,:~'~..~.;i~.,.~
Packers and SSSV (type and measured depth) 4-1/2", TIW 'HBBP' packer at 9317'; 4-1/2" Otis SSSV Landing Nipple at 2231'
13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch
14. Estimated date for commencing operation¢ 15. Status of well classifications as:
September 4, 2002 /
!6. If proposal was verbally approved [] Oil [] Gas [] Suspended
Service
Name of approver Date Approved
'Contac~ Engineer Name/Number: Dave Wesley, 564-5773 Prepared By Name/Number: Terrie Hubble, 564-4628
'~ ~. I hereby certify that th =, foregoing is true and correct to the best of my'knowledge ...............
Signed Bill I~cson L uL' ~,- /.'-- -- Title Senior Drilling Engineer Date ~/~ q / 0
Conditions of Approval= Notify Commissio~so representative may witness Approval No..~.~.. ~
Plug integrity ~ BOP Test ~ Location clearance ~
MechanicallntegrityTest__(-;)l:lglrlal~ntformrequiredl0- &/¢7 T'e.$'¢- J o P E ~ 5 ¢oo ~ ~' .
Approved by order of the Commission Cammy Oechsli Taylor
- f'~ I~ ! t"'~ tl ~ I A I Commissioner Date 0~t
Form 10-403 Rev. 06/15/88 [ J 1<, I t _i b Submit Ih~'l~rl31icate
To: Winton Aubert - AOGCC Date: August 29, 2002
From:
Dave Wesley, Jr. - BPXA GPB Rotary Drilling
Subject:
Reference:
C-32A Application for Sundry Approval - P&A for Sidetrack Operations
APl # 50-029-21559-01
Approval is requested for the proposed P&A of PBU well C-32A. Well C-32 was unsuccessfully
sidetracked in September 1998 and has since been suspended. Well C-32A targeted the Zone 1 fluvial
deposits and would have been a horizontal completion. During drilling, the well encountered a shale
wedge, causing the well to be steered in attempts to avoid the shale. Further drilling penetrated sands
with anomalous gamma ray readings that were difficult to correlate. Finally, sand alternating shales were
drilled and the well was landed at a TD of 12,268'. Mechanically speaking, the window had been milled
and the well had been drilled to TD, but the pipe and bit became stuck while reaming shales. Once the
pipe was stuck, crude was circulated in an attempt to release the pipe. This proved to be unsuccessful.
The coil was chemical cut at 11,020', and further fishing attempts were also ineffective.
The original parent well, C-32, produced six million barrels of oil from the 14P/13P zones from August
1986 to August 1998. Additionally, perforations were added in a 27P oil lens to extend the life of the well.
At the time of the sidetrack, the parent well was suffering high gas rates and thus a GOR exceeding
marginal. A fault penetrating the well in Zone 2 was suspected to be the source of the gas, thus GSO
operations were not attempted because of the significant risk involving the fault.
The C-32B sidetrack is currently scheduled for Nabors rig 2ES, beginning around September 15,
2002, after the completion of the H-02A sidetrack. The pre-rig work for this sidetrack is planned to begin
as soon as the attached Application for Sundry is approved.
Scope
Pre. Ri; Work:
* Notify the field AOGCC representative with intent to plug and abandon *
1. Rig up slick line, drift and tag tubing to top of fish at - 9,573' MD.
2. PJU E-line. RIH and set EZSV cement retainer in the 4 %" tubing tail.
3. PJU coil tubing unit. RIH to cement retainer, plug and abandon, with 15.8ppg class 'G' cement, the
open hole and fish up into the tubing tail to the cement retainer. Use adequate cement volume to fill
the open hole, including the fish, pl.,qs., squeeze away approximately 10bbls. The estimated minimum
cement volume required is 47bbls. Pull out of retainer and circulate the tubing above the retainer
clean.
4. Drift and tag the top of the cement retainer to confirm clear to required cut depth of approximately
9,275'.
5. Fluid-pack the 4 %" tubing and 9 5~8" x 4 %" annulus to surface. Test the integrity of the cement plug
and the 9 5/8" casing to 3000psi for 30 minutes./' /
6. R/U E-line. RIH with Chemical cutter and cut the 4 W' tubing at -9,275' MD, in the middle of the joint
between the Seal assembly and the sliding sleeve.
7. Displace the well to clean seawater by circulating down the tubing through the tubing cut. Continue to
circulate until clean seawater returns to surface. Freeze protect top 2200' MD with diesel.
8. Test the 9 5~8" pack-off and tubing hanger seals to 5000psi for 30 minutes. Function all Lock Down
Screws, repair or replace as needed.
C-32A Application for Sundry
T
9. Bleed casing and annulus pressures to zero.
10. Set a BPV in the tubing hanger. Secure well.
11. If necessary, level the pad. Please provide total well preparation cost on the handover form.
Ria
1.
2.
3.
4.
5.
6.
Operations:
MIRU Nabors 2ES
Circulate out freeze protection and displace well to seawater. Set TWC.
Nipple down tree. Nipple up and test BOPE to 3,500psi.
Pull 4%" tubing from the cut at -9,275' MD and above.
MU 8 %" milling BHA. RIH and drift down to the remaining tubing stump. POOH.
P/U and RIH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired,
and set on remaining tubing stump. Mill window in 9 5/8" casing at _+ 9,257' MD, plus an additional
-20' formation. Pull up into 9 5~8" casing and conduct an FIT to 12.5ppg EMW. POOH.
7. RIH with 8 %" Dir/GR assembly. Kick off and drill the 8 1/2" section into the top of the Sag River at
-9,670' MD.
8. Run and cement a 7", 26.0#, L-80 intermediate drilling liner.
9. RIH with a 6 1/8" DirlGRIReslDen/Neu assembly to the landing collar.
10. Test the 9 5/8" casing X 7" liner from the landing collar to surface to 3000psi for 30 minutes.
11. Drill out the 7" liner shoe, plus -20 new formation. Conduct an FIT to 10.0ppg EMW.
12. Drill to TD of approximately 12,265' MD in Zone lA, according to the directional proposal. POOH.
13. Run and cement a 4 %", 12.6#, L-80 production liner. POOH.
14. R/U and RIH with Halliburton 2 %" dpc perforating guns. Perforate per Halliburton recommendation.
POOH.
15. Run a 4 1/2", 12.6#, L-80 completion, stinging into the 4 1/2" liner tie back.
16. Set packer and test the tubing and annulus to 3000psi for 30 minutes.
17. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
18. Freeze protect the well to -2200' and secure the well.
19. Rig down and move off.
Post-Rig Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from landing nipple below the production
packer. Install gas lift valves.
2. Install well house and instrumentation.
Estimated Pre-rig Start Date: 09/01/02
Estimated Spud Date: 09/15/02
Dave Wesley, Jr.
Operations Drilling Engineer
564-5773
C-32A Application for Sundry
TREE = 4" ClW
WELLH~.AD= FMC
ACTUATOR= Axelson
KB. ELEV = 65.33'
'i~i~:"~'"; ................................... ~'§':'i~i'"
KOP = 500'
'~"X'~'~i~"';' .......... ~'iP'"~"~'~8"6;
Datum MD = 10,211'
Datum 'rVD= 8800' SS
C-32A Curred,
I 13-3/8" CSG, 72#, L-80, ID = 12.347" Id 2903'
9-5/8" CSG, 47#, L-80, N$CC, ID = 8.681" Id 5125' I ~
SAFETY NOTES: Well is abandoned. Tight hole at 11,117'.
3 1/4" open hole drilled to 11,168'. No cement, FIoPro in
open hole, MeOH in tubing to 1,800'.
2231' I--14 1/2" OTIS SSSV LAND. NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH SIZE DATE
6 3243 2927 34° OTIS RA
5 5588 4845 32° OTIS RA
4 7064 6071 36° OTIS RA
3 8029 6871 31° OTIS RA
2 8834 7577 27° OTIS RA
1 9175 7885 25° OTIS RA
IMinimum ID = 3.725" @ 9389'
4 1/2" 'XN' Landing nipple
I~'o.o~" Liner I-i
9410' I
4 1/2" TBG, 12.6#, L-80, .0152 bpf, ID: 3.058" Id 9419'
9-5/8" CSG, 47#, L-80, BTRS, ID = 8.681" Id 9665'
PERFORATION SUMMARY
REF LOG: BHCS 03/18/86
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
9301' I-I"""s~'^ss¥ I
9317' 1-195/8"x4 1/2"TlVVHBBPPKR, ID:4.75" I
9358'
~1 9389'
1-14-1/2" x N~P, ID: 3.813"
I--~4-1/2" 'XN' NIP, ID = 3.725"
I9419' I-~4'1/2'' Tubing Tail I
I9424' I-I ELMDTubingTa,I I
9573'
IdFish - 24 DP, 30 DC, Jars and fishing tools.
! Top at 9,573'; bottom at 11,406'.
Top of Whipstock @ 10080', RA Tag @ 10089'
IP~TD H
I 7" LNR, 29#, L-80, .0371 bpf, ID= 6.184" Id
10520'I
DATE' REV BY COMMENTS DATE REV BY COMMENTS
09/21/98 CTD Sidetrack
02/05/01 SIS-Isl CONVERTED TO CANVAS
03/09/01 SIS-LG FINAL
04/24/01 KAK CORRECTIONS
07/11/02 DEW Re-create in Canvas 7
PRUDHOE BAY UNIT
WELL: C-32A
PERMIT No: 1981620
APl No: 50-029-21559-01
Sec. 19, T11N, R14E
BP Exploration (Alaska)
~ = 4" ClW
WELIrH.~.AD= FM(
ACTUATOR= Axelson
KB. ELEV = 65.33'
KOP = 500'
~.~,,X.~,~ii~,.,z .......... .~;~.~-~,,y~-66~
Datum MD = 10,211'
Datum TVD= 8800' SS
C-32A Pre-Ri
SAFETY NOTES: Well is abandoned. Tight hole at 11,117'.
3 1/4" open hole drilled to 11,168'. No cement, FIoPro in
open hole, MeOH in tubing to 1,800'.
13-3/8" CSG, 72#, L-80, ID= 12.347" I--~ 2903'
9-5/8" CSG, 47#, L-80, "SCC, ID = 8.681" Id 5125'
IMinimum ID = 3.725" ~ 9389'
4 1/2" 'XN' Landing nipple
2231' Id4 1/2" OTIS SSSV LAND. NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH SIZE DATE
6 3243 2927 34° OTIS RA
5 5588 4845 32° OTIS RA
4 7064 6071 36° OTIS RA
3 8029 6871 31° OTIS RA
2 8834 7577 27° OTIS RA
1 9175 7885 25° OTIS RA
[ 9243' [--~4 1/2" SLIDING SLEEVE, ID = 3.813"
I Chemical cut during pre-rig ops. I~
~9275'I
-- I 9301' I
Icement retainer I-I ~9335' I
----I 9317'
9358'
Id95/8"x 4 I/2"TIWHBBPPKR, ID=4.75" I
Id 4-1/2" X NIP, ID = 3.813" [
ITop of 7" Liner Id 9410'
1/2" TBG, 12.6#, L-80, .0152 bpf, ID: 3.958" Id 9419'
9-5/8" CSG, 47#, L-80, B'rRS, ID = 8.681" Id 9665'
PEF~FO~TION SUMMARY
REF LOG: BHCS 03/18186
ANGLE AT TOP PEP, F:
Note: Refer to Production DB for historical perf data
SIZE SPF INTI~VAL Opn/Sqz DATE
9419' l-~4-1/2" Tubing Tail
I Id Fish - 24 DP, 30 DC, Jars and fishing tools.
9573' I! Top at 9,573'; bottom at 11,406'.
Top of Whipstock @ 10080', RA Tag @ 10089'
I-I
17" LNR, 29#, L-80, .0371 bpf, ID= 6.184" Id
DATE REV BY COMMB~ITS DATE REV BY COMMENTS
09/21/98 CTD Sidetrack 07/25/02 DEW Pre rig condition
02/05/01 SIS-Isl CONVER'rF_.D TO CANVAS
03/09/01 SIS-LG FINAL
04/24/01 KAK CORRECTIONS
07/11/02: DEW Re-create in Canvas 7
PRUDHOE BAY UNIT
WB.L: C-32A
PERMIT No: 1981620
APl No: 50-029-21559-01
Sec. 19, T11N, R14E
BP Exploration (Alaska)
..
[ _~hare. d (
~ _~erwces
~.~, '~rilling
AlasKa ~
Date: July 27,1999
To:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Blair Wondzell
Sr. Petroleum Engineer
Re:
Well C-32a Suspension
On Sept. 22, 1998 a report was submitted to AOGCC describing the fish left
in the well. Opportunities for further use of this wellbore are still being
evaluated but not yet resolved. We are therefore asking that C-32a be placed
on suspended status pending development of a plan for future utilization of the
well.
Ted Stagg
CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
RECEIVED
Nl~ska Oil & Gas Cons. cmmission
South (feet)
I I I I I I I I I I I I I I I I I
I I I I I I I I II I I I
oesqns
(~e~) q,tde(] ID3!l.~e^ en.~1 _>
(-..
STATE OF ALASKA It,'''
ALASKA OIL AND GAS CONSERVATION COMMISSION CTD$idetmck
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
r-I Oil [--I Gas I~ Suspended [-'1 Abandoned [-'1 Service
2. Name of Operator 7. Permit Number
BP ExpIoratien (Alaska)Inc. 98-162
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21559-01
4. Location of well at surface~ 9. Unit or Lease Name
1700' SNL, 883' WEL, SEC. 19, T11N, R14E,UM ! ~ Prudhoe Bay Unit
At top of productive interval1 "~ 10. Well Number
2552' SNL, 4030' EWL, SEC. 20, T11 N, R14E, UM "~ C-32A
At total depth 11. Field and Pool
2354' SNL, 417' EWL, SEC. 21 T11N, R14E, UM
i · · Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and SenaTNo Pool
KBE = 65.30' ADL 028306
12. Date Spudded 113. Date T.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore 116. No. of Completions
9/8/98 9/14/98 9/22/98 N/A MSLI One
:J ~. Total Depth (MD+TVD) 118. Plug Back Depth (MD+'I'VD)119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
12268 8985 FTI 12268 8985 FTI C~Yes [--INoI 2231' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, ROP
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PU~ rD
20" Insulated Conductor Surface 110' 26" 8 cu )/ds concrete
.13-3/8" 723 L-80 Surface 2904' 17-1/2" 4074 cu ft Cold Set II
9-5/8" 47# L-80/Butt/SCSS Surface 9665' 12-1/4" 570 cu ft Class 'G'
7" 29# L-80 9411' 10082' 8-1/2" 375 cu ft class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 9419' 9317'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
1800' Freeze Protect with 25 Bbls of MeOH
.
i 4iki,Ai
Date First Production I Method of Operation (Flowing, gas lift, etc.) v w · ~ ~,, ~ i · a · ~
Not on Production I N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO
'rEST PERIOD
I
Flow Tubing Casing Pressure 0ALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAWTY-API (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
O 1999,
Alaska 0ii & Gas Com. C0mmissi0rl
Anchorage
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids
Depth Depth recovered and gravity, GOR, and time of each phase.
Zone 1 10475' 8967'
Zone 1 11653' 8950'
Zone 1 11844' 8944'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrleHubble ~'~~.~'. ~ Title TechnicalAssistantlll Date~'~'(~
C-32A 98-162 Prepared By Name/Number: Terrie Hubble, 564-4628
.... Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL-' This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5-' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Well: C-32A Accept: 09/07/98
Field: Prudhoe Bay Spud: 09/08/98
AP I: 50-029-21599-01 Re lease: 09/22/98
Permit: 98-162 CTD Unit: Nordic #1
~!~.~,~;!: i:~,~i~i~i~i~,¥'~ ~ii:.":"'.';' '.~':~' ~. :;~?',': ,~'~iii · .= ,.~ ~.~ '~ ~ ~;..:' ~"~'~ ~'~'~:,'~?.~:~.~.~ ? ~ ~'., :'.'..~'~.:'~.~. ~.~.: ~:~,~.~.,:: :~ ~ ~'.., ~: ~ ~ ~:~:;~'. '...~: :::....... ~,.~:;.~ ~ ........... ~;r, ~: ~ ,,~ ~:~ ;,~. <.,.~, :,~ =~..., ...,~
09/08~8 I 10090'
Moved CTD unit from C-6 to C32. Accepted rig on C32a at 0800 hm 9~/98. NU BOPE.
AOGCC waived witnessing BOP Test (Lar~ Ward). PT BOPE. PU Bakem milling BHA. TIH
while reducing IA pressure. Tagged XN at 9397'. Corrected to 9394' (white Flag). Milled out
XN nipple. RIH. Tagged WS at 10086' Flagged pipe. Milling window. Milled 3.80" window
from 10084.7 - 10090 ff. POOH. Lay out dimple mill and flex it. M/U formation mill and string
reamer. RIH,
09/09/98 2 10550'
TIH and Corrected to flag at 10084.5'. Milling with string mill from 10082' to 10095'. Backed
reamed 3 times. (Window from 10082' to 10089' RA at 10089') Turned hole over to 66k rio-
pro. Reamed again and POOH. LD Milling BHA and PU Drilling BHA. Sperry and Baker on
Clock at 1400 hrs. RIH with Drilling BHA. Shallow test Sperry MWD. RIH. Orient TF to 15L.
RIH thru clean window. Drill build section from 10,095 - 10,350. Make wiper trip back to 10,100.
Clean PU. RIH and drill from 10,350 - 10,479' at 70L. Orient TF to 55R. Drill to 10,484, then
Orient TF to 90R. Drill 10,350 -10,500. Make wiper trip to 10,100'. Drill from 10,500 ongoing.
09/10/98 3 11114'
Drill horizontal hole from 10550 - 10603 ft. POOH for new motor and bit. Tie-in with RA tag and
flag CT. POOH. M/U BHA #4 with 1.0 deg. motor. RIH with BHA #4. Tie-in with Flag. RIH
and drill horizontal hole from 10603 - 10826 ft. Short trip to window. RIH and drill horizontal
hole from
10826 - 10958 ft. Short trip to window. Tie-in with RA tag at 10,089 ft BKB with -6ft correction.
Drill from 10958 - 11060', seeing some weight transfer problems with slight o/pulls. Dogleg is
less than anticipated. Talk to geologists about being slightly wide at the start of polygon vs.
POOH for motor bend change. Pipe stuck at 11060', unable to get free at 80k up/-18k dn. Spot
dead crude and came free on 2nd pull at 64k after 6bbls out. Make short trip back to window for
hole cleaning. Tie-in depths to RA tag with + 8ft correction. Drill from 11062' - 11114'. ROP
slowed. Not getting enough dogleg. POOH for new motor. Correct depth at RA tag by +1.5'.
09/11/98 4 11511'
POOH for motor change. Bit in good condition. RIH with BHA#5. 1.5 deg motor and Bit#2 RR.
Tie-in with flag. Correct by - 8ft. Drill 11114 - 11150. Ream shales at 11150. Found Kavik at
11105' MD (8926' TVD). Drill up and level off at 11240' MD (8923' TVD) to find top but unable
to find clean sands after large GR spike at 11280' MD. Build more angle and drill to 11324', GR
character has changed. Make wiper trip to window. Tie-in to RA tag with +2.5 ft correction. Drill
11324 - 11393' GR not falling off. PUH and check GR readings at 10975 - 10985'. OK. Continue
drilling at 96 incl to 11434'. Still in shale at 8910' TVD and 98 incl. Does not look right. Make
wiper trip. Discuss options with geologist, fax logs to town geologist. Discuss plan. Re-log 11100
- 11150' to confirm GR measurements. Looks OK. Agree to drop angle back to 96 incl and drill
further 200 - 300 ft MD in polygon to delineate top of Kavild ratty sand. Geologist seeing oil in
samples but this may be affected by residual oil from freeing stuck pipe earlier.
C-32A, Coil Tubing Drilling(~'
Page 2
09/12/98 5 11940'
Drill high GR shale to 11563 ft. Made wiper trip to window. Tied-in with RA tag. Added 7 ft to
CTD. Ream shales at 11360, 11390, 11420 and 11530 ft. Back ream to 11100 ft. Ream
shales again to 11560 ft. Back ream to 11100 ft. Change to new FIoPro with 5% lubetex.
Ream to TD. Orient TF. Drill 96-98 deg incl. Hole from 11563 -11604 ft. Drill out top of Kavik
shale at 11604 ft [ 8891' TVDSS]. Drill horizontal hole from 11604 - 11750 ft BKB. Short trip to
window. Tie-in with RA tag. Add 9ft. Ream in hole. Drill from 11757 to 11808'. Difficult sliding.
Backream up 50ft. Drill on to 11853'. Make wiper trip to window. Saw 10k o/pull at 11560'
otherwise fairly clean. Tie-in to RA tag. Add 3.5 ft. Ream in slowly. Saw ledges at 11265, 11345
and 11357. Drill from 11856 to stall at 11860 and saw pattern change. Shale at 11850 (88878'
TVD) ROP falling. Drill to 11878'. Orient TF to nose up and avoid shale, but saw GR fall off at
11860, so Orient TF back to continue drilling ahead towards 85 deg incl. New target depth is
8910 - 8915ft TVD or stay in 60 - 70 APl sand.
09/13/98 6 12117'
Drill horizontal hole from 11940 - 11988 ft. POOH for bit and motor. M/U BHA #6 with 1.5 deg
motor. Change out Sperry MWD and orientor. RIH. Correct depth at flag. [-7 ft CTD]. RIH.
Drill from
11988 - 12117 ft. Short trip to window. Tie-in to RA tag. Add 7ft. Ream down. Hang up at
11490, 11536, 11540. Backream to top of shales at 11280. Ream in and HU 11515. Backream
to 11300. O/pull 8k thru 11350'. Found flakes of mineral scale on shaker. Decide to PUH and jet
7" liner above window. Tie-in to RA tag, Add 7ft. Large pieces (2.5" x 2" x ~,~") of corrosion
scale returned. RIH and hang up at 10260, 10340 and 10346'. Orient TF but still unable to get
past 10346. Pressure increased as we pull up through shales and we are pumping off pipe
weight due to hydraulics. Bit appears balled. Polymer has fisheye lumps on shakers with white
clay mixture. POOH. Saw o/pull coming through SSD and GLM's 2 & 4. Bit had chipped cutters
and worn/missing back reamer buttons. White clay residue seen in flow courses but no other
bailing seen. Likely lost clay ball coming through completion. RIH with same motor and M58 bit.
09/14/98 7 12268'
RIH with BHA #7. Circulate and clean window area. Lost MWD signal. Lost 400 psi pump
press. POOH for BHA. Rig off clock at 08:00 hrs. Found leaking CT connector at surface.
Change out CTC, MWD and bit. RIH with BHA #8. Tied-in with RA tag. RIH and reamed
shales at 10350, 10745, 10780,
11360 and 11525 ft. Reamed to TD in 3 ~ hrs. Orient TF to 90L and drill from 12117 - 12157
at -3 to -4k dn wt.', backream 50 ft, drill on to 12179, pump 20bbl pill with 1/2gall lubetex.
Backream 30ft. Drill on to 12185. Make wiper trip to 11800 (above deepest shales). Drill down at
-3k to -4k from 12185 - 12200, inc rate and stalled. Got weight back here and drill to 12223.
Backream up 70ft. Drill smooth to 12268. Stacking here. Make short trip to window. 8k o/pulls at
11560' pulling 5k bobbles through shales. Stuck pipe at 11264. Call out crude. Pump 5 bbls rig
diesel while waiting. No movement. Pump 20bbls crude and got free after soak then pull to 80k.
Pulling with erratic bobbles up to 2.d stuck point at 11174.
Work pipe. Appear to lose MWD signal strength. Able to orient. Circulate crude out of mud while
trouble shooting MWD. Stby to pump 2nd batch of crude.
..
Page 3
09/15/98 8 11155'
Circulate crude out of mud. Pump 2nd batch of crude. Check orienter. Work pipe. Now bit stuck,
work free, pump max. rate for 15 mins. Work pipe 90k/-20k. Order HP pump to disconnect.
Recover crude from well. Pump disconnect ball. Hold safety meeting. Pressure up and shear
release disconnect at 6500 psi. Pull 90k. Still stuck. Order more crude. Pump 25 bbls crude,
soak with 15 bbls out. Work CT 90k/-15k. Decide to swap to new mud. Recover crude. Found
cement blockages in Pits. Clean I pit and empty 2 more. Work pipe in new mud. Lost 20k
weight, PU 5ft, then stuck again. Pump max rate. Work pipe 90k/-20k. No movement. Baker
tools on location. Hold safety meeting. Pull test rig weight cell against CT weight cell to check
for error. Pull 30k. Set slips w/3000psi on Koomey. Insert manual slips and dog collar. Slackoff
chain tension. Strip injector up. Make drainage cut. Zero pressure. Cut CT at 4ft above rig floor
and dress ends. MU Baker 2.75" Overshot with 2.375" packoff. MU TIW valve and XO w/
2.875" 8R box. Hold safety meeting with Atlas. Rig up riser and chemical cutting equipment.
09/16/98 9 12268'
RIH with Atlas 1.75" OD chemical cutter. Start pumping 1.25 BPM down CT while running
horizontal section to push cutter along. Pump pressure increased when cutter guide nose
landed on CT connector shoulder. Pick up 200 ft and RIH again with pump to ensure correct
depth. Same depth and pressure response. Shut down pump. Pick up cutter 3 ft above
connector. Fire chemical cutter at 11,020 ft. Attempted to pull chemical cutter but it was in a
friction bind. Reverse circulate at 1 bpm to help force cutter out of cut point in CT. Pulled free.
POOH. Held Safety meeting with crews. R/D Atlas equipment. Pulled CT up 6 ft with no
overpull. CT is free. Set slips and R/D Baker overshot. M/U DS internal connector. Pull test.
POOH with CT. Internal connector mandrel broke while bending onto reel. Secured each end
of CT with pipe clamps and chains. Aligned ends of CT and welded on 2 ½" sleeve over ends.
POOH with CT. No overpull in open hole. Displace CT with Nitrogen. Secure end of CT on
reel. Swap reels. Stab CT. Change packoff. Install CTC; pull test. Pig CT with wiper plug.
Pedorm weekly BOPE test.
09/17/98 10 12268'
Perform weekly BOPE test. Fax test forms to AOGCC. M/U Baker fishing BHA with Sperry
orientor. RIH with fishing BHA #1. Sat down on whipstock with muleshoe. Orient and fell thru.
Work tight shales while RIH. Land on fish at 11,110 ft. Orient 4 times before latching fish with
overshot. Jar down a total of 36 times and jar up 10 times with no movement of fish. Pump
7/8" steel ball to disconnect. POOH to change jars and BHA. Cut 150' of coil. MU fishing BHA
#2 with GS hyd spear. RIH. Slight wt loss through shales. Latch fish. Jar down 15 times, up
10, and down 20 more. Good jar action. Fish did not move. POOH. LD fishing BHA #2. Call
for drillpipe.
09/18/98 11 12268'
RIH with fishing BHA #3. Perform BOP drill. Latch fish at 11,110' CTM. Jar down and fish fell
free. Work fish. PU, unable to pull free. Push fish down to 11,226'. Pump off and circ at full
pump to clean hole. RIH. Latch fish at 11226'. Work to 11189'. Stopped. Jar down to free.
Work fish up and down. Push to 11,361'. PUH clean to 11,162'. No further progress. Attempt
to pump spear off fish. Can't POOH. RIH to 11,361' and drop ball to disconnect. Sheared ball
at 4200 psi. PUH to 11,158' and stopped. Cycle pipe and worked to 11,117' (90k up). Lost
movement down. Jar down and up - no go. Spot 10 bbls crude. Continue jarring. Call for
Atlas and chemical cutter.
C.32A, Coil Tubing Drilling{.~' ("
Page 4
09/19~98 12 12268'
Continue jarring down and up on Fishing BHA #3. No luck. Circulate lubetex pill to open hole.
Jar down and up, still had good jar action, no luck. Pull max. up wt. Fish still stuck. Circulate
conditioned FIoPro to open hole. Held Safety Meeting with crew. Cut CT 5 ft above rig floor.
Install 5 s,4" Baker overshot with pack-off on CT. M/U safety valve and XO. R/U Atlas E-Line
unit with Lubricator. Held Safety Meeting. Pick up chemical cutter and RIH. Tie-in. Tag CTC
at 9,398' CBL. PU and fire cutter at 9,376' CBL. POOH. RD Atlas. MU DS spoolable internal
connector. Pull test. Start POOH with coil. Connector broke going over gooseneck. Secure
ends, pull across pipe shed, align, weld 2-1/2" sleeve over ends. POOH. Blow down coil with
N2.
09/20/98 13 12268'
Displace FIoPro in CT with Nitrogen. Pull end of CT to reel and secure reel for crane pick. R/U
Halco wireline and RIH with Baker 3 5/8" overshot. Sat down at 9379 ft. Unable to overshot
end of CT. POOH. RIH with LIB and found coil stub highside. Build 1-3/4" OD guide for
overshot. RIH, jar down on fish. Slight friction bite - no more. POOH and check tools. Marks
show guide was inside fish. RIH and beat down 30 times and got about 3'. Shear off. POOH.
Overshot planted. RD slickline. Install and test 2-7/8" pipe rams. RU to run drill pipe.
Changed out reel during slickline operation.
09/21/98 14 12268'
RU to run 2-7/8" PAC drill pipe. Hold safety meeting. TIH with fishing BHA #4 (GS spear, HDC,
bumper sub, DC's and DP). Park above fish and reverse circ two BU. Check wts: 80K up, 60K
down. Tag and latch fish. Jar down 10 times and fish came loose. Circulate to clean well.
Spot 20 bbls 7% lubetex pill. PU at 95K and moved fish 10' before getting overpull. PU in 5K
increments to 125K. Slack-off clean at each step. Gained 10' more. PU to 130K. Jars went
off. Could not slack-off. Jar down 3 times. Fish came free. PU to 125K. Jars went off and lost
fish. TIH. Tag TOF at 9573' in 7" casing. PU and got 10K friction bite, then lost it. Slack-off
30K on fish. PU. Same result. Pump dry job. TOH laying down singles.
09/22/98 15 12268'
TOH with drillpipe fishing BHA laying down sinlges. Circ MeOH at 1800' to freeze protect.
TOH. LD fishing tools. GS spear shows no apparent damage/wear. Off load drill pipe, collars,
and liner. Draine and clean pits. Pull CT to floor and stab. Change 2-7/8" pipe rams to 2-3/8".
Prepare to ND BOPE and move off well.
Page 5
09/23/98 16 12268'
Nipple down BOP stack. N/U tree cap and pressure test with 3500 psi. The tubing was freeze
protected to 1800 ft. FIoPro was left in open hole and in tubing Move rig off well. Released rig
at 09:00 Hrs, 09/22/98. Total time on well was 15 days and one hour. Install bogie tires in
cellar due to soft roads. Move Nordic #1 rig to J-15a.
Note: The well was not completed. The drilling BHA and fishing BHA's were left in the well.
Top of the fish is at 9573 feet in 7" liner. The bottom of the fish is in the 3.75" open hole at
11406 Ft.
B.P. Exploration (True)
Pad C
C-32A
C-32
Prudhoe Bay
North Slope, Alaska
SURVEY LISTING
by
Baker Hughes INTEQ
Your ref : C-32A
Our ref : svy191
License : 50-029-21559-01
Date printed : 28-Ju1-1999
Date created : 28-Ju1-1999
Last revised : 28-Ju1-1999
Field is centred on 708179.340,5930615.440,999.00000,N
Structure is centred on 665344.787,5961240.589,999.00000,N
Slot location is n70 17 44.598,w148 40 4.345
Slot Grid coordinates are N 5959522.000, E 664506.000
Slot local coordinates are 1699.83 S 876.46 W
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
B.P. Exploration (True)
Pad COC-32A
Prudhoe Bay,North Slope, Alaska
Measured Inclin Azimuth Subsea R E C T A N G
Depth Degrees Degrees Depth C O O R D I N
SURVEY LISTING Page 1
Your ref : C-32A
Last revised : 28-Ju1-1999
U L A R Dogleg Vert G R I D C O O R D S
A T E S Deg/100ft Sect Easting Northing
10000.00 27.38 112.70 8628.68 834.12S 4567.81E 1.20 0.00 669090.75 5958788.65
10080.00 27.97 113.90 8699.52 848.81S 4601.94E 1.01 28.94 669125.18 5958774.71
10108.40 33.13 112.47 8723.97 854.48S 4615.21E 18.35 40.21 669138.57 5958769.33
10144.10 38.76 110.67 8752.86 862.16S 4634.69E 16.04 56.93 669158.22 5958762.08
10169.00 42.98 109.41 8771.69 '867.74S 4650.00E 17.27 70.18 669173.65 5958756.85
10187.90 46.31 108.46 8785.13 872.04S 4662.56E 17.97 81.13 669186.30 5958752.82
10224.50 52.30 102.06 8809.00 879.27S 4689.31E 21.05 104.97 669213.20 5958746.18
10257.60 57.70 98.76 8827.98 884.14S 4715.97E 18.24 129.35 669239.96 5958741.90
10288.40 62.10 93.86 8843.43 887.04S 4742.44E 19.83 154.08 669266.48 5958739.58
10317.20 64.20 89.26 8856.45 887.73S 4768.11E 16.01 178.63 669292.16 5958739.46
10347.70 66.60 84.16 8869.15 886.13S 4795.78E 17.12 205.72 669319.79 5958741.67
10378.50 70.30 79.46 8880.47 882.04S 4824.12E 18.59 234.12 669348.03 5958746,38
10412.80 75.00 73.66 8890.70 874.41S 4855.93E 21.17 266.81 669379.66 5958754.71
10445.90 79.70 69.06 8897.95 864.08S 4886.52E 19.63 299.04 669410.01 5958765.70
10475.60 83.90 6.3.26 8902.19 852.20S 4913.38E 23.95 328.11 669436.60 5958778.17
10505.60 86.90 67.46 8904.60 839.74S 4940.55E 17.17 357.63 669463.49 5958791.23
10538.90 87.00 .73.46 8906.37 828.62S 4971.88E 17.99 390.78 669494.56 5958803..03
10574.80 87.90 81.36 8907.97 820.81S 5006.85E 22.13 426.57 669529.35 5958811.61
10613.20 90.30 81.86 8908.57 815.21S 5044.83E 6.38 464.66 669567.20 5958818.04
10648.70 92.20 86.76 8907.80 811.69S 5080.14E 14.80 499.62 669602.42 5958822.34
10678.70 90.40 90.66 8907.12 811.02S 5110.12E 14.31 528.69 669632.37 5958823.67
10696.30 89.00 92.76 8907.21 811.55S 5127.71E 14.34 545.49 669649.97 5958823.53
10716.20 87.10 95.06 8907.89 812.90S 5147.55E 14.99 564.25 669669.83 5958822.61
10752.20 86.30 99.96 8909.96 817.60S 5183.17E 13.77 597.31 669705.54 5958818.70
10785.10 87.10 105.06 8911.85 824.71S 5215.22E 15.67 626.29 669737.75 5958812.30
10813.40 85.90 109.46 8913.58 833.09S 5242.19E 16.09 650.03 669764.89 5958804.52
10843.10 84.50 112.46 8916.07 843.67S 5269.82E 11.11 673.82 669792.75 5958794.54
10879.70 83.40 114.76 8919.93 858.25S 5303.17E 6.93 702.05 669826.40 5958780.71
10912.40 86.10 111.76 8922.92 871.10S 5333.08E 12.31 727.42 669856.59 5958768.51
10947.00 89.10 109.86 8924.37 883.38S 5365.39E 10.26 755.27 669889.16 5958756.95.
10980.50 91.40 107.56 8924.22 894.13S 5397.12E 9.71 782.96 669921.11 5958746.91
11018.00 89.80 104.86 8923.83 904.59S 5433.12E 8.37 814.84 669957.33 5958737.23
11059.40 89.10 102.46 8924.23 914.37S 5473.34E 6.04 850.98 669997.76 5958728.35
11088.40 88.40 101.36 8924.86 920.35S 5501.71E 4.50 876.71 670026.25 5958722.99
11116.80 88.50 100.16 8925.63 925.65S 5529.60E 4.24 902.16 670054.25 5958718.30
11145.00 88.50 96.46 8926.37 929.72S 5557.49E 13.12 927.94 670082.22 5958714.85
11190.90 92.80 90.66 8925.84 932.57S 5603.27E 15173 971.29 670128.04 5958713.00
11220.50 93.00 85.76 8924.35 931.65S 5632.81E 16.55 1000.00 670157.55 5958714.58
11248.10 89.40 79.46 8923.77 928.10S 5660.15E 26.28 1027.29 670184.81 5958718.73
11280.40 91.50 73.96 8923.51 920.68S 5691.57E 18.23 1059.55 670216.06 5958726.84
11316.40 94.00 69.36 8921.79 909.37S 5725.69E 14.53 1095.46 670249.92 5958738.89
11358.00 95.10 61.86 8918.48 892.26S 5763.43E 18.17 1136.40 670287.27 5958756.83
11388.60 97.50 56.86 8915.12 876.77S 5789.59E 18.03 1165.75 670313.09 5958772.89
11415.60 98.60 52.36 8911.34 861.29S 5811.38E 17.00 1190.89 670334.53 5958788.84
11444.50 98.40 45.86 8907.06 842.59S 5832.98E 22.25 1216.70 670355.70 5958808.01
11474.80 97.30 42.86 8902.92 821.13S 5853.96E 10.46 1242.67 670376.21 5958829.93
11509.60 95.60 38.46 8899.01 794.91S 5876.48E 13.48 1271.39 670398.15 5958856.64
11546.80 94.40 44.26 8895.77 767.11S 5900.96E 15.86 1302.42 670422.01 5958884.97
11604.90 95.70 51.46 8890.65 728.30S 5943.84E 12.55 1354.12 670464.02 5958924.71
11633.20 98.40 59.76 8887.17 712.45S 5967.00E 30.63 1380.67 670486.82 5958941.06
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from C-32 and SSTVD from RKB - MSL = 65.3 ft.
Bottom hole distance is 6612.51 on azimuth 95.68 degrees from wellhead.
Vertical section is from tie at S 834.12 E 4567.81 on azimuth 74.47 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ
B.P. Exploration (True)
Pad C,C-32A
Prudhoe Bay,North Slope, Alaska
SURVEY LISTING Page 2
Your ref = C-32A
Last revised ~ 28-Ju1-1999
Measured Inclin Azimuth Subsea
Depth Degrees Degrees Depth
11667.00 97.00 61.06 8882.64
11727.10 93.90 68.16 8876.92
11780.30 89.30 79.06 8875.43
11830.10 85.30 84.16 8877.78
11865.00 84.20 88.16 8880.98
Dogleg Ver=
Deg/100ft Sect
G R I D C O O R D S
Easting Northing.
695.91S 5996.12E 5.63 1413.16 670515.57 5958958.24
670.29S 6050.13E 12.84 1472.06 670569.00 5958985.04
655.31S 6101.06E 22.23 1525.14 670619.58 5959001.13
648.05S 6150.25E 13.00 1574.48 670668.59 5959009.47
645.73S 6184.92E 11.84 1608.50 670703.20 5959012.56
11894.20 85.90 89.46 8883.50 645.12S 6214.00E 7.32 1636.68 670732.26 5959013.80
11925.00 87.70 93.46 8885.21 645.91S 6244.73E 14.22 1666.09 670763.00 5959013.70
11962.50 86.00 99.26 8887.28 650.05S 6281.93E 16.09 1700.82 670800.28 5959010.37
12000.40 83.20 108.06 8890.85 658.95S 6318.55E 24.27 1733.72 670837.09 5959002.29
12027.00 83.60 104.36 8893.91 666.32S 6343.92E 13.90 1756.19 670862.61 5958995.47
12058.70 84.70 99.66 8897.14 672.88S 6374.76E 15.15 1784.14 670893.58 5958989.59
12085.20 85.60 96.26 8899.38 676.53S 6400.91E 13.23 1808.36 670919.80 5958986..52
12115.20 83.80 89.06 8902.16 677.92S 6430.72E 24.64 1836.72 670949.64 5958985.78
12147.50 82.50 86.46 8906.01 676.67S 6462.77E 8.95 1867.92 670981.64 5958987.74
12177.70 83.40 82.76 8909.72 673.85S 6492.60E 12.52 1897.%2 671011.41 5958991.21
12207.20 83.00 77.86 8913.21 668.93S 6521.46E 16.55 1926.55 671040.15 5958996.77
12239.40 84.50 75.06 8916.72 661.43S 6552.58E 9.82 1958.54 671071.09 595900~.95
12268.00 84.50 75.06 8919.46 654.09S 6580.08E 0.00 1987.00 671098.43 5959012.89
Ail data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from C-32 and SSTVD from ~,KB - MsL = 65.3 ft.
Bottom hole distance is 6612.51 on azimuth 95.68 degrees from wellhead.
Vertical section is from tie at S 834.12 E 4567.81 on azimuth 74.47 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes iNTEQ
B.P. Exploration (True)
Pad C,C-32A
Prudhoe Bay, North Slope, Alaska
SURVEY LISTING Page
Your ref : C-22A
Last revised : 28-Ju1-1999
Comments in wellpath
m=mmmmmmmmm=mmmmmmmm
MD SSTVD Rectangular Coords. Comment
10000.00 8628.68 834.12S 4567.81E Tie-in Point
12268.00 8919.46 654.09S ,6580.08E Projected to TD
NO PROPOSAL
To:
State of Alaska December 23, 199B
Alaska Oil and Gas Conservation Comm.
Atm.: Lori Taylor
3001 Porcupine Drive
MWD Formation Evaluation Logs C-32A, AK-MW-B0371
,,C-32A:
2" x 5" MI) Gamma Ray Logs:
50-029-21599-01
1 Blueline
1 Rolled Sepia
2" x 5" TVD Cramma Ray Logs:
50-029-21599-01
1 Blueline
1 Rolled Sepia
~E ACKNOWI~u~E ~CEll'r BY SIGNING AND RETURNING ~ ATFACRED COPIES
OF ~ TRANSMrVrAL LE~ TO ~ ATTENTION OF..
Sperry-Sun Drilling Services
Arm: Ali Turker
5631 Silverado Way, Suite O.
Anchorage, Alaska 9951B
RECEIVED
Da~c 2'-" in. tlR
Alaska Oil & Gas Cons. Commission
.Anchorage
BP Exploration (Alaska) Inc.
Petro-technic~ Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
S
('
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Loft Taylor '~
3001 Porcupine Dr. Q.--
Anchorage, Alaska 99501 q'~.' J ''~ ~x'~qC)
MWD Formation Evaluation Logs C-32A AK-MW-80371
December 16, 1998
1 LDWG formatted Dim with verifie~on listing.
API#: 50-029-21599-01
H.,EA~E ACKNOWLEDGe, RECEIPT BY SIGN--lNG AND RETURNING TI~ ATYACI~,D COPIES
OF THE TRANSMrlTAL LETTER TO ~ ATrENTION OF:
Sperry-Sun Drilling Services
Attn: Ali Turker
5631 Silverado Way, Suite O.
BP Exploration (Alaska) Inc.
Petro-teehnieal Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
DEC 17 1998
c~l & ,,~'Z;ara, C0mmissW. Si
~c~o~
5631 Silvemdo Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535
A Halliburton Company
BP EXPLORATION
Date: 12-07-98
Trans~ 89959
BP/PBU CASED HOLE LOGS
Enclosed is the materials listed below. If you have any questions please contact me in the Petrotechnical Data
Center at (907) 564-4166.
Isw.~.~o I.~ ~ i.o~ D~ ICompany Code IComments
C-3SA ICH I 04'Dec'981PDS leAS ENTRY
Please sign and return one copy of this transmittal.
Thank-you,
Carla H. Mclntosh
Petrotechnical Data Center
CH LOGS
Becky Clark
MB9-3
Exxon- Susan Nisbet
Phillips- Info. Management
AOGCC- Lori Taylor
I blueline
I blueline
I blueline
I blueline/1 RS
Petrotechnical Data Center, MB3-3
900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612
SEP 22 ' 98
BP EXPLORATION
BP Exploration (Alaska) Ino.
PO El;ix 10681E
Anchorage, Alaska 99519-6512
02:26PM BP EXPLORATION
TELECOPY
COMMUNICATIONS CENTER
Date:
P.1
TO:
Name:
Oompany:
Looation:
Fax #
Confirm #
FROM; Name & EAt.:
'Department:
NOTBS:
PAGE8 TO FOLLOW ___-~ (Does Not Include Oover Sheet) SEP 2 :~ 1[998
Alask~ 0il & Gas Cons. Commi~io~
...... ~-:: .............................. ~ .......... . ...... : ...... ~.~:: ---= ..... ~ _ --"~ ......... ..~ -- ;-:;= -.;
SEOURITY O~S$1FICATION
PRIVATE
.
Teleoopy #.564-5500
Confirm # 564-5823
8EORET
CONFIDENTIAL
,For OommunioMione Center Uae Only
Time In
Time Sent
Time confirmed ......
Oonfirmed By
22
02: 2GPM BP EXPLORATION
BP EXPLORATION
P.2
Bp Explomlio~ {Alsslcm) Inc.
go0 Eaet Ben~on BOuleYGKI
Anchorage, AleGkla. 99619-6618
(e~) 6m-~111
--
·
Date; September 22, 1998
To:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Re:
Blair Wondzell
Sr. Reservoir Engineer
Well C-32a Fishing Operation
The ooil drilling unit, DSINordic 1, was released from C-32a at 09:00
ho,urn today. This letter and accompanying data are being submitted
to ~nform you of the current status of operations on C-32a and to ask
for clarification on what further may be needed by AOGCC at this time.
The sidetrack, C-32a, had reached a depth of 12,268' MD when the
BHA became stuck on a wiper trip at 11,117' MD. Fishing operations
were successful in moving the fish downhole some 240 ft and back to
the original stuck point numerous times but with no progress above
11,117'. Failure of a fishing neck o,n 9/21198 left the top of the fishing
assembly at a d,epth of 9,573' MD, reside the 7" liner. The position of
the fish and fishing assembly are indicated on the attached schematic.
A detailed description of equipment currently in the hole is also
attached.
Current plans are to drill and complete the sidetrack of J-15a, organize
new fishing equipment, and return to continue fishing operations on C-
32a in about 10-14 days.
C-32a was left with overbalance drilling fluid to approx. 1700 ff and
$0% MeOH freeze protection to surface, The full tree remains in place
and the flowline is connected and freeze protected, The well is stable
with zero surface pressure,
CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
SEP 2 g 1998
SEP 22 '98 02:27PM BP EXPLORATION
I I ~. I ~ I
TREE: 4" ClW
WEL. LHEAD: FMC C-32a Current Status 9122198
ACTUATOR: AXEL$ON
P.3
KB. ELEV '
BF, ELEV = 39.93'
L-B0, BTRS
KOP: 800'
MAX ANGLE: 36' ~ 7200'
.,
4-1/2", 12.6#/tt~ L-80, IPC
AB MODBTRS TUBING ID: 3.82"
CAPACITY: 0.0152 BBL/FT
9-518", 47~/ft,
L-80, N$CC
7" LINER
9-518", 47#/ft,
L-80, BTRS
SSSV LANDING NIPPLE
( OTIS )( 3.813" ID)
I2231' I
GAS LIFT MANDRELS
r OTIS Li~I~ WI R ~ LATCH}
N~ MDrBKB} 'T'VDss
6 3243 2927
5588 4845
7064 6071
i 8029 6871
8834 7677
9176 7886
4.5" SUDING SLEEVE
( OTiS XA)
( a,813" MIN. ID)
PBR SEAL A$$Y.
9-$/8" PACKER
( TIW HBBP)(4.75"1D)
4.5", 12.Sfffit, L-80
TAILPIPE
4.5" "X" NIPPLE
( 3,813" ID)
4.5" '~(N" NIPPLE
( 3.725= ID)
BROWN SOS (~?? "ID)
(ELMD)
._l,
i 9243'
I, .o1' I
9368'
9389'
9419'
g424'
WhipstoGk (~ 10,080', 6 deg. R
Downequeezed Abandonment
P~ERFORA,TION SUMMARY
RE;: LOG: BHCS 3116186
-~IZE SPF INTERVAl., C 3EN/SQZ'D
I IIII I
2-718 4 10,118'-10,123' )PEN
3-318' 6 10,307'-10,313' ~QZ'D
2-7/8 4 10,362'-10,392' ::)PEN
PBTD 10476'
7", 20#/fl, L-e0, IJ4S 10620'
Fish #2: 1t
Fish ~1: 1t,208-11,151'
Fishing Assy: 11,130-9,37S'
Current TD 12,258'
SEP 22
'98 02:28PM BP EXPLORATION
ITEM
BIT
Mo'tar' 1.5 BH SN
Row ?u~e
' O?ientor, 8N 7731
Flex Joint
Cir. Sub, SN 403
Dowell Lower
. SN 302
Cennee~en
3 g/IS"'CSH
2 718" SAM #2P 2 718" SAM #2P
2 718" SAM #2P 2 7/6",SAM'#2P.
2 7/8". SAM #2P
2D6,aO
LHDC ~Oe
P.4
1.15
TOP
11,194,~0
1 i, 171
11,1 ~8.26
"11,1~;67
11,167,$6
11,182.32
11,161,19
11 ;I 94:60
11, ! 9'&75 '
'J1,171i~8
11,168,26.
' 11,164167
11,157.35
11,153.36
11.151.19
Baker X-O
HYD Dlscanne~
3 ff ~tmke
II Co!!~_rs
;ellmm
Drill Collars
Baker Cro~over
2 718I' PAC
Accelerator
Boker, 19,2#
Lower NI'~I
NI~J
Dowell CTC
overshot, 2 giB" PO /
BoRer ~$ Sleeve with 6" X 1 ,(~.5" PBR
FISH e3 (2~,lts. DP and $0 DC's)
FISH & FISHIN(g Total
7lB" Pac Box
Pao Bex
Pa¢~ Box
Pac~ Box
Pae Box
Pac Box
7/8" Pac Box
2 3/8" IF BOx
2 7/B" PaC I~X
2 7/6" Pa¢ BOX
LNRJ
CT
CT
8rd
C.~
7/8" Pae
7/~* Pae Pin
?/8" Pa~
Tlr Pa;
7/8" Pa= Pin
7/8" Pao Pin
7/8' Pae Pin
7/8" Pae Pin
7/~" Psa Pin
UNRJ
Srd
1.53
0.~
~16~
1,60
!,15
2,00
799,98
704,$B
1,1~
11,128,38
11,127.70
11,126.17
11,076.35
11,045.7~
11,015.14
10,985.05
10,954,72
10,e'.as.aB
10,924.43
10,916.23
10,915.08
10,913.06
10,1!3.1~
9,408.22
9,40%0?
9,402.96
9,$81,70
9,$76.1Cl
9,375.29
9,375.29
11,1~9,86
11,110.52
11,108.52
11,076,3e
11,045.76
11,015,14
10,985.05
10,954.72
10,926.03
10,916,23
10,915.08
10.913108
10.115.10
9,407.D7
9,6/35,07
9,40g,~
9,401,49
9,400
9,361 ,?0
9,376.10
9,375.~
8EP 2 2 1998
Alaska Oil & Gas Cons. Commission
Anemone
I;i~ Btrlng
"JFI~ In Hole
F~.H.
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
August 31, 1998
Ted Stagg
Coiled Tubing Drilling Engineering
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Prudhoe Bay Unit C-32A
BP Exploration (Alaska) Inc.
Permit No. 98-162
Sur. Loc. 1700'SNL, 883%VEL, Sec. 19, T1 IN, RI4E, UM
Btmnhole Loc. 2642'SNL, 1361'WEL, Sec. 20, T1 IN, R14E, UM
D~ar Mr. Stagg:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
DavidW. Jo ton~~
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASK(~ .)IL AND GAS CONSERVATION ~' .~IMISSION
PERMIT TO DRILL c? Sidetrack well
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [-I Exploratory [] Stratigraphic Test [] DeveloPment Oil
[] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone I-1 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE=65.33 Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation ,~,~(.. Bay Pool
P.O. Box196612, Anchorage, Alaska 99519-6612 ADLJ32.8806'
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1700' SNL, 883' WEL, Sec. 19, T11 N, R14E, UPM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
2500' SNL, 1679' WEL, Sec. 20, T11 N, R14E, UPM C-32A
At total depth 9. Approximate spud date Amount $200,000.00
2642' SNL, 1361' WEL, Sec. 20, T11 N, R14E, UPM 9/1/98
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 02803 @ 626'I No Close Approach 2560 12,480', 8919' TVDss
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 10,087 Maximum Hole Angle 9o° Maximum surface 3350 psig, At total depth ('I'VD) 3339 @8800' psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
3-3/4" 2 7/8" 6.16# L-80 ST-L 3107' 9373' 8064 12,480' 8919' 140 c.f.
19. To be completed for Redrill, Re-entry, and Deepen Operations. r~ r
Present well condition summary A
Total depth: measured 10520 feet Plugs (measured)
true vertical 9145 feet AJaska 0ii & Gas Cons. Commission
Effective depth: measured 10476 feet Junk (measured) Anchorage
true vertical 9108 feet
Casing Length Size Cemented MD TVD
Structural BKB
Conductor 85' 20x30 8 cu. yds. 110' 110'
Surface 2879' 13-3/8" 4074 c.f. 2904' 2712'
Intermediate 9640' 9-5/8" 570 c.f. 9665' 8391'
Production
Liner 1110' 7" 375 c.f. 9410'-10520' 8162'-9145'
.,,
. ,
Perforation depth: measured 10352' - 10392'
true vertical subsea 8936' - 8970'
201 AttaChments [] Filing Fee [] Drilling Fluid Program [] Property Plat [] Time vs Depth Plot [] BOP Sketch [] Refraction Analysis [] Oiverter Sketch [] Seabed Rep
Contact Engineer Name/Number: Ted Stagg 564-4694 Prepared By Name/Number: Theresa Mills 564-5894
21. I hereby certify t'~'at the foregRing is true and correct to the best of my knowledge ..'.
TedStaao .~¢f~'_r,~ p~/" Title Coiled Tubir3g.l~ing Engineer Date
Commission Use Only
Permit Number J AP, Number J Appr~ova, ~_ate ..,. J See cover letter
,,,,~'~'-.,,,,/.~' ~ 50- <:~ :Z. <~,-- ~/' ~".3'"~' -' C:) / j~J ---',.~//-"~'("~ for other requirements
Conditions of Approval: Samples Required [] Yes [] No Mud Log Required [] Yes,~ No
Hydrogen Sulfide Measures .~Yes [] No Directional Survey Required ,~ Yes [] No
[] 5M; [] 10M;[] 15M
Required Working Pressure for DOPE [] 2M; [] 3M;
Other:
by order of ~'__~__.~,~
Approved By .~ ,mt'l=~l .~mn,,n D,, Commissioner th~ commissinn Date
Form 10-401 Rev. 12-01-85
Y
,.David W. Johnston
Submit In Triplicate
BPX
C-32A Sidetrack
Summary of Operations:
C-32 is a poor cycle performer with fault related high GOR. The sidetrack, C-32A, will target
Zone 1(14P-13P) reserves.
This sidetrack will be conducted in two phases.
Phase 1: Lay abandonment cement and set whipstock: Planned for 8119/98.
C-32 will be tested for tubing integrity, drifted for the whipstock and a Kinley caliper will be
run to evaluate liner and tubing condition.
Existing perforations will be abandoned with approx. 20 bbls cement. Abandonment
cement will be downsqueezed past a mechanical whipstock set at approx. 10,087'.
Abandonment cement will be pressure tested to 1500 psi with AOGCC witness. This
procedure is described in more detail in the Form 10-403.
Phase 2: Mill Window and Drill Directional Hole: Planned for 911198.
Directional drilling coil tubing equipment will be rigged up and utilized to mill the
window and drill the directional hole as per attached plan.
Mud Program: - Phase 1: Seawater
- Phase 2: FIo-Pro (8.8 - 8.9 ppg)
Casing Program:
- 2 7/8", 6.16#, L-80, ST-L liner will be run from TD to approx. 9,373' MD and cemented with
approx. 25 bbls. cement. The well will then be perforated with coil tubing conveyed guns.
Well Control: - BOP diagram is attached.
- Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4000 psi.
- The annular preventer will be tested to 400 psi and 2000 psi.
Directional - See attachments.
- Kick Off: 10,087' MD (8,706' TVD ss)
- TD: 12,480' MD (8,919' TVD ss)
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging · A Gamma Ray log will be run over all of the open hole section.
· Memory CNL will be run in the 2 7/8" liner.
TREE: 4" CIW
WELLHEAD: FMC
ACTUATOR: AXELSON
C-32a Proposed Completion
KB. ELEV = 65.33'
BF. ELEV = 39.93'
13-3/8", 72#/fi, 12903.I
L-80, BTRS
KOP: 500'
MAX ANGLE: 36° @ 7200'
4-1/2", 12.6~/ff, L-80, IPC
AB MODBTRS TUBING ID: 3.82"
CAPACITY: 0.0152 BBL/FT
9-5/8", 47#/ft,
L-80, NSCC
ISURFACE- 5125'
TOP OF 9782I
7" LINER
9-5/8", 47#/ft,
L-80, BTRS
I 5125-9665'
2 718" Cemented Liner
Whipstock
Downsqueezed Abandonment
PERFORATION SUMMARY
REF: LOG: BHCS 3/18/86
SIZE SPF INTERVAL 0 ~EN/SQZ'D
2-7/8 4 10,118'-10,123' ;)PEN
3-3/8 6 10,307'-10,313' ~SQZ'D
2-7/8 4 10,352'-10,392' OPEN
PBTD I 10476'
7", 29~/ft, 1-80, IJ4S
I 10520'
SSSV LANDING NIPPLE
( OTIS )( 3.813" ID)
I 2231'
GAS LIFT MANDRELS
OTIS LBD W/R~\ LAT(;H~
-N MD(BKB) TVDss
3243 2927
5588 4845
7064 6071
8029 6871
8834 7577
9175 7885
4.5" SLIDING SLEEVE
I
( OTiS XA) I 9243'
( 3.813" MIN. ID)
PBR SEALASSY. I 9301'
9-5/8" PACKER I 9317'
( TIWHBBP)(4.75"1D)
I
4.5", 12.6~/ft, L-80
TAILPIPE
4.5 .... x" N~PPLE I 9358'
( 3.813" ID)
I
4.5 .... XN" NIPPLE 9389'
( 3.725" ID)
BROWN SOS (???? "ID) 9419'
(ELMD)
9424'
E
Z
0
0
0
0
0
OO'l o~ tuo~ aou~s!p A
C-32A
CT Drilling & Completion BOP
2318" CT ~ I
I I
I ~o,ooo psil
Pack-Offl
12"
7 1116"
36" Annular
Blind/Shear
22.5" 7 t/'16"
Pipe/Slip ~ 2 3/8"
I
38" ?PipeSlipst/16,, ~ ~ 2 718"
~ 2 318"
I
SWAB OR MASTER VALVE
· WELL PERMIT CHECKLIST
FIELD & POOL ~_~_,~~_~_
--COMPANY ~_/~.P WELL NAME ~F~,,f. ~_--- ~,~__,Z~
INIT CLASS ~ GEOL AREA
PROGRAM: exp [] dev~li~' redrll~,'l~ serv [] wellbore seg II ann. disposal para req I I
·
UNIT# /',,/~'_¢',~ ON/OFF SHORE _,-.,~) _
..........
ADMINISTRATION
IIENGINEERING
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
Conductor string provided ...................
Surface casing protects all known USDWs ...........
CMT vol adequate to circulate on conductor & surf csg .....
CMT vol adequate to tie-in long string to surf csg ........
CM'¥ will cover all known productive horizons ..........
Casing designs adequate for C. T. B & permafrost .......
Adequate tankage or reserve pit .................
If a re-drill, has a 10-403 for abandonment been approved...
Adequate wellbore separation proposed .............
If diverter required, does it meet regulations ..........
Drilling fluid program schematic & equip list adequate .....
BOPEs. do they meet regulation .............. ; ·
BOPE press rating appropriate; test to ~.1 o' OO ps~g.
Choke manifold complies w/APl RP-53 (May 84) ........
Work will occur without operation shutdown ...........
Is presence of H2S gas probable .................
D~TE
. el['8.'-/~
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
N
N
N
N
N
N.....
N
N
GEOLOGY
~ ..~?~R DjATI~
30. Permit can be issued w/o hydrogen sulfide measures ..... ~y//~- YY N~,/2
31. Data presented on potential overpressure zones ....... /~
32. Seismic analysis of shallow gas zones ..... ' ........ ~o', ,,
33. Seabed condition survey (if off-shore) ............. N
34. Con, tact.nam, elphon.e.for weekly progress reports ....... . N
lexp~oramry omy]
ANNULAR DISPOSAL 35.
APPR DATE
Y N
Y N
Y N
Y N
ENGINEERING: UlC/Annular
BEWJ~'~
JDH.~
Y N
COMMISSION:
DWJ ~
co d_~/t~' '
Comments/Instructions:
With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; .......
(B) will not contaminate freshwater; or cause drilling waste...
to surface;
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from a
pool; and
E will not circumvent 20 AAC 25.252 or 20 AAC 25.412.
GEOLOGY:
M:chel;lisl iov 05~29~98
dlf'C ~rn~of h(:,;~wL~r dianXdiar~;
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to. the Well Permitting Process
but is part' of the history' file.
To improve {he readability of the Well History file and to
simptify finding information; informati;3n of this
nature is accumulated at the, end of the file under APPENDIX.
No special effort has been made to chronologically
.
organize this ,category of information.
Sperry-Sun Drillin9 Services
LIS Scan Utility
Mort Dec 14 14:34:19 1998
Reel Header
Service name ............. LISTPE
Date ..................... 98/12/14
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writin~ Library.
Tape Header
Service name ............. LISTPE
Date ..................... 98/12/14
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writin~ Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-80371
BUD JAHN
WHITLOW/ANGE
C-32A
500292159901
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
14-DEC-98
MWD RUN 2 MWD RUN 3
AK-MW-80371 AK-MW-80371
BUD JAHN BUD JAHN
WHITLOW/ANGE WHITLOW/ANGE
DEC 17
u, Com ission
Ancholalg'O
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
MWD RUN 4
AK-MW-80371
BUD JAHN
WHITLOW/ANGE
MWD RUN 6
AK-MW- 80371
BUD JAHN
WHITLOW/ANGE
19
llN
14E
1700
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUlqD LEVEL:
WELL CASING RECORD
883
.00
65.30
37.40
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 9.625 9665.0
2ND STRING 7.000 9373.0
3RD STRING 4.500 9424.0
PRODUCTION STRING 3.750 12268.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 THROUGH 6 ARE DIRECTIONAL WITH
SCINTILLATION TYPE
GAMMA RAY (NGP).
3. MWD RUN 5 DRILLED NO FOOTAGE AND IS NOT PRESENTED.
4. MWD RUN 6 IS REALTIME PULSED DATA. TOOL WAS LOST IN
HOLE AND WELL PLUGGED
BACK ANDABANDONED.
5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS
PER THE E-MAIL MESSAGE
FROM TRACY LOVE OF BP EXPLORATION (ALASKA), INC. ON 02
NOVEMBER, 1998.
6. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12268'MD,
8919'SST~-D.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED GAMMA RAY.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
VersiOn Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR
ROP 10098.0 12268.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 10098.0 10605.0
2 10605.0 11115.0
3 11115.0 11986.0
4 11986.0 12117.0
6 12117.0 12268.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block'sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD API 4 1 68 4 2
ROP MWD FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 10070 12268 11169 4397 10070
GR 17.02 308 64.2003 4343 10070
ROP 16.45 1290.84 78.2742 4341 10098
Last
Reading
12268
12241
12268
First Reading For Entire File .......... 10070
Last Reading For Entire File ........... 12268
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name... ~
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10070.0 10577.5
ROP 10098.0 10604.5
$
LOG HEADER DATA
DATE LOGGED: 09-SEP-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 27.4
MAXIMUM ANGLE: 87.9
TOOL sTRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE NGP SPC 264'
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT): 3.8
BOREHOLE CONDITIONS
MUD TYPE: FLO-PRO
MUD DENSITY (LB/G) : 8.80
MUD VISCOSITY (S): .0
MUD PH: 8.8
MUD CHLORIDES (PPM):
FLUID LOSS (C3) : 6.0
RESISTIVITY (OHMM) AT TEMPERATURE
(DEGF)
MSC 1.32 MSC 1.32
5.74, 3.01e
MEMORY
10605.0
10098.0
10605.0
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 1 API 4 1 68 4 2
ROP MWD 1 FT/H 4 1 68 8 3
60.9
First
Name Min Max Mean Nsam Reading
DEPT 10070 10604.5 10337.2 1070 10070
GR 17.02 183 39.9807 1016 10070
ROP 21.26 188.09 74.2625 1014 10098
Last
Reading
10604.5
10577.5
10,604.5
First Reading For Entire File .......... 10070
Last Reading For Entire File ........... 10604.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
P~AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10579.0 11087.5
ROP 10606.5 11114.0
$
LOG HEADER DATA
DATE LOGGED: 10-SEP-98
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 83.4
M~%XI~ ANGLE: 92.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
NGP NATURAL GAMMA PROBE NGP SPC 243
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): '3.750
DRILLER'S CASING DEPTH (FT): 3 . 8
BOREHOLE CONDITIONS
MUD TYPE: FLO-PRO
MUD DENSITY (LB/G): 8.80
MUD VISCOSITY (S): .0
MUD PH: 8.6
MUD CHLORIDES (PPM) :
FLUID LOSS (C3): 5.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MSC 1.32 MSC 1.32
5.74, 3.01e
MEMORY
11115.0
10605.0
11115.0
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 API 4 1 68 4 2
ROP MWD 2 FT/H 4 I 68 8 3
65.6
First
Name Min Max Mean Nsam Reading
DEPT 10579 11114 10846.5 1071 10579
GR 22.46 187.72 47.0129 1018 10579
ROP 46.67 936 95.4849 1016 10606.5
Last
Reading
11114
11087.5
11~'14
First Reading For Entire File .......... 10579
Last Reading For Entire File ........... 11114
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name..' ......... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11088.5
ROP 11116.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11959.0
11985.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MITD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
12-SEP-98
MSC 1.32 MSC 1.32
5.74, 3.01e
MEMORY
11986.0
11115.0
11986.0
83.7
98.6
TOOL NUMBER
NGP SPC 243
3.750
3.8
FLO- PRO
8.90
.0
8.6
10.2
.000
.000
70.3
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 ,'API 4 1 68 4 2
ROP MWD 3 ~" FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11088.5 11985.5 11537 1795 11088.5
GR 24.54 308 85.5753 1742 11088.5
ROP 16.45 1290.84 67.6616 1740 11116
Last
Reading
11985.5
11959
11985.5
First Reading For Entire File .......... 11088.5
Last Reading For Entire File ........... 11985.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11960.0
ROP 11987.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIM UMANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12090.0
12116.5
TOOL STRING (TOP TO BoTToM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
12-SEP-98
MSC 1.32 MSC 1.32
5.74, 3.01e
MEMORY
12117.0
11986.0
12117.0
83.3
85.6
TOOL NUMBER
NGP SPC 264
3.750
3.8
FLO-PRO
8.90
.0
8.5
6.0
.000
.000
.000
60.9
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 4 API 4 1 68 4 2
ROP MWD 4 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 11960 12116.5 12038.2 314 11960
GR 31.42 135.33 62.7957 261 11960
ROP 56.29 259.5 89.9913 259 11987.5
Last
Reading
12116.5
12090
12116.5
First Reading For Entire File .......... 11960
Last Reading For Entire File ........... 12116.5
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
P~AW MWD
Curves and lo9 header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 12083.5
ROP 12112.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
.MAXIMUMANGLE:
STOP DEPTH
12241.0
12268.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
13-SEP-98
MSC 1.32 MSC 1.32
5.74, 3.01e
MEMORY
12268.0
12117.0
12268.0
82.5
84.5
TOOL NUMBER
NGP SPC 243
3.750
3.8
FLO-PRO
8.90
.0
8.0
6.8
.000
.000
.000
.000
86.7
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.6
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 6 API 4 1 68 4 2
ROP MWD 6 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 12083.5 12268 12175.8 370 12083.5
GR 39.94 161.11 80.6952 316 12083.5
ROP 19.87 954 84.6598 312 '12112,5
Last
Reading
12268
12241
12268
First Reading For Entire File .......... 12083.5
Last Reading For Entire File ........... 12268
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 98/12/14
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 98/12/14
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing
Reel Trailer
Service name ............. LISTPE
Date ..................... 98/12/14
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing
Library.
Library.
Scientific
Scientific
Technical
Technical
Services
Services
Physical EOF
Physical EOF
End Of LIS File
Well Compliance Report
File on Left side of folder
198-162-0 PRUDHOE BAY UNIT
Roll #1: Start: Stop Roll #2:
MD 12268 TVD08985 Completion Date:
C-32A 50- 029-21559-01
Start Stop
9/22/98 Completed Status: SUSP
BP EXPLORATION
(ALASKA) INC
Current:
Nflme
D 8790
L NGP-MD
L NGP-TVD
R SRVY LSTNG
Daily Well Ops ......... -- _ .......
Was the well cored? yes no
Comments:
Interval
1-6 SPERRY GR
FINAL 10098-12268
FINAL 8701-9818
BHI 10000-12268
Sent Received
OH 12/16/98 12/17/98
OH 12/23/98 ! 2/23/98
OH 12/23/98 12/23/98
OH 8/2/99 8/3/99
Are Dry Ditch Samples Required? yes
Analysis Description Received? yes no
no
T/C/D
And Received? yes no
Sample Set #
Wednesday, November 08, 2000 Page 1 of I