Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout173-042� -I -z�, -- d `-t Z
v�,�SEDSTgT�s UNITED STATES ENVIRONMENTAL PROTECTION AGENCY APR 2, 5 '1014
a REGION 10
L 1200 Sixth Avenue, Suite 900 A0171CC
Seattle, WA 98101-3140
i �
�qt nRojEo10APR
` '
OFACE OF
COKIVIJANCE ��ND ENFORCEMENT
Reply to: OC'L=127
ci.,wrIhIED MAIL IZETUIZN RECEIFF IZEQUES'I'E D
\rlr. William G. Britt,.lr.
Environmental Manager K, - Kar -0
1-lilcorp Alaska, LLC
'1800 Centerpoint Drive, Suite 100
Anchorage, Alaska 995()
31 SCUM ul;r C 8) 2014
Re: Underground Injection Control (1110) Program
Under Permit Number AK -1 1006-A substltUl1011 ofalternate candidate wells:
Class I Well Dl 5-RD2 with D22, Dolly Varden Platform, "Trading Bay Unit, C )ok inlet, Alaska
Class I Well K1 i with K4 -RD, King Salmon Platform, "Trading Bay Unit, Coo Inlet, Alaska
Class I Well G16 with G19, Grayling Platform, Trading Bay Unit, Cook inlet, Alaska
Dear Mr. Britt:
The U.S. Environmental Protection Agency, Region 10 (CPA) has received your request to substitute
three listed candidate wells with three alternate candidate wells on three separate platforms. Per the
Class I Underground Injection Control permit AK11006-A Part It, A., 1., the permittee is authorized to
substitute alternate candidate wells. The EPA approves the permittee's request to substitute Class I Well
D 15-RD2 with D22 on the Dolly Varden Platform, Class I Well K i 1 with K4 -RD on the King Salmon
Platform, and Class I. Well G16 with G19 on the Grayling Platform. All candidate wells are located in
the Trading Bay Unit, Cook Inlet, Alaska.
If you have any questions regarding this matter, please contact Thor Cutler of my staff at
(206) 553-16731, or email: cutler.thor(ufcpa.gov.
'dwar`"'ic J. gwalski
Director
cc: Vdiris Wallace
Alaska Oil and Gas Conservation Commission -Anchorage
Marc Bentley
Alaska Department of Environmental Conservation -Anchorage
Page 1 of 1
Maunder, Thomas E (DOA)
From: Regg, James B (DOA)
Sent: Tuesday, December 01, 2009 3:48 PM
To: Maunder, Thomas E (DOA)
Subject: FW: King Salmon Injector K-04RD
Jim Regg
AOGCC
333 W.7th Avenue, Suite 100
Anchorage, AK 99501
907-793-1236
~~~ - ~\/.
From: KRAMER, TED E [mailto:TED.KRAMER@chevron.com]
Sent: Tuesday, December 01, 2009 3:43 PM
To: Hubert, Winton G (DOA); Regg, James 6 (DOA)
Cc: Greenstein, Larry P '~~ ., ~_~~,;~.~°~ ; ~~ , ;; ~ r
Subject: King Salmon Injector K-04RD ~ ~ ~~ `-
Winton and Jim,
This is to let you know that Chevron has shut in the above water injector at the end of the evening shift on
11 /30/09.
K-4rd was injecting on an Administrative Approval (AA) AIO 5.008 due to a tubing by inner annulus
communication. A condition of this AA is that Chevron perfprm a temperature survey every two years.
Chevron made several unsuccessful attempts to run in the well to obtain the temperature survey. Chevron then
ran. a camera and determined that a heavy scale deposit at 556' was preventing further progress into the well.
Attempts to broach past the scale enabled progress to 2847'. No progress could be made deeper than this point.
A scale sample was obtained and is being analyzed. Once its composition is known, a stimulation or work over
will be considered. Chevron will notify the AOGCC of any stimulation or work over plans prior to carrying them
out.
Sincerely,
Ted E. Kramer
Petroleum Engineer
MidContinent/Alaska Business Unit
Chevron North America Exploration and Production
3800 Centerpoint Drive, Suite 100
Anchorage, AK 99503.
Tel 907 263 7960
Ce11 907-382-0059
Fax 907 263 7847
ted.kramer@chevron.com
12/2/2009
King Salmon Platform Well No. ~RD Injector AIO Administrative Appal AIO 5.008 - Co..
~_
Regg, James B (DOA)
Page 1 2f~2''
~~~
From: KRAMER, TED E (TED.KRAMER@chevron.com] ~ ~ ``~
Sent: Monday, January 07, 2008 10:54 AM ~ i
To: Regg, James B (DOA); Maunder, Thomas E (DOA) ~~~
Cc: Greenstein, Larry P; Johnson, Wayne E
Subject: King Salmon Platform Well No. K-4RD Injector AIO Administrative Approval AIO 5.008 -Compliance
Temp Survey
Attachments: K-4RD Temp Survey 12-10-07 vs 9-18-05.zip ~~~~' ~~~ ~ ~ Z~~~
Jim & Tom,
A compliance temp survey was conducted for King Salmon well number K-4RD, AIO 5 (PTD 173-042) on 12/10/07.
The previous compliance temp survey was conducted on 9/18/05.
The attached temp plots (MD and TVD) contains overlays of the last two temperature surveys for K-4RD (12/10/07 and
9/18/05).
These two surveys closely resemble each other with the 12/10/07 survey being slightly cooler than the 9/18/05 survey.
This is most likely due to a slightly shorter amount of SI time prior to running the 12/10/07 survey.
Both surveys contain three heating anomalies at 4,300 ft., 8450 ft., and 10,020 ft. These anomalies are consistent
throughout the recorded surveys. The first two anomalies have been discussed in previous correspondence and therefore
have been addressed as being caused by fluid movement in a shallow zone (4,300 feet) and as the top of cement. (8,450
feet).
The anomaly at 10,020 feet coincides with a section of casing that is only covered by one casing string. It is believed that
the single string of casing allows this section to be less insulated (thermally) from the formation than other sections of the
well bore. This lack of insulation and the packer placement in this area allows a quicker temperature response than other
parts of the well bore.
While this theory for the heating anomaly is open to discussion and debate, the survey does not show any cooling from
injection fluid until the water passes below the packer at 10,050 feet. This confirms that the injection water is leaving the
packer and entering the desired perforations.
Please call me to discuss if you have any questions.
«K-4RD Temp Survey 12-10-07 vs 9-18-05.zip»
Ted E. Kramer
Petroleum Engineer
MidContinent/Alaska Business Unit
Chevron North America Exploration and Production
909 West 9th Avenue
Anchorage, AK 99501-3322
Tel 907 263 7960
Cell 907-382-0059
Fax 907 263 7847
ted.kramer@chevron.com
1 /7/2008
~~~ I.~3-~;a~L
Unocal Well: K-4RD Field: King Salmon
0
0
1000
2000
3000
4000
.~.
a..
'~ 5000
6000
a
m
7000
sooo
9000
10000
11000
40
50 fi0 70 80 90 100 110 120 130 140
Temperature (Deg. F)
12-10-07 Pressure - Perfs D Mandrel 13-3/8"
~~ 9-5/8" ~ 7" .~ 5" ~~ 3-1/2" TBG
-12-10-07 Temp 9-18-05 Temp
Report date: 1/7/2008
Pressure (psia)
500 1000 1500 2000 2500 3000 3500 4000 4500
0
1000
2000
3000
~^,, 4000
d
t>1
0
~ 5000
~"'
t
~ 6001
700
800
90C
1001,.,
40
}-~ ~ ? 3-04-Z
50 60 70 80 90 100 110 120
Temperature (Deg. F)
i ~u ~ ~+~
-12-10-07 Pressure - Perfs ~ Mandrel 13-3/8"
~~ 9-5/8" ~~
-12-10-07 Temp -9-18-05 Temp =_. _ __ _-
Pressure (psia)
inn 1000 1500 2000 2500 3000 3500 4000 4500
`h i~ ~ 1
`a a i ~ - I I
i ~ 1
{ i ~ 1" 'I I ~~
_
r~ ~ ;
ALA$SA OIL A1QD GAS
COI~TSER~ATIOI~T CO1rIl-IIS5IOI~T
•
i
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7"' AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
ADMINISTRATIVE APPROVAL AIO x.008
Mr. Hal Martin
Optimization Engineer
Unocal Alaska
P.O. Box 196247
Anchorage, AK 99519-6247
~~~6~~~~ JAN ~ ~ 2008
RE: Trading Bay Unit K-4RD [aka King Salmon 4RD] (PTD 173-042}
Request for Administrative Approval AIO ~
Dear Mr. Martin:
By letter application received October 10, 200 Union Oil Company of California
("Unocal") requested administrative approval to resume water injection into the subject
well. Based on an evaluation of the submitted information and review of the well file, the
Alaska Oil and Gas Conservation Commission grants Unocal's request for administrative
approval to resume water injection in the subject well per Rule 9 of Area Injection Order
("AIO") 005.
AOGCC finds the following:
1. This well has had known tubing x inner annulus ("T x IA") communication since
at leastl992 and has been operating with Commission approval.
2. On May 6, 2004 Unocal reported that communication had been observed in the 7"
x 9-5/8" casing annulus and the well was shut in.
3. In early- April 2005, Unocal applied by sundry to return the well to injection so
that diagnostic logging could be performed in support of an administrative ap-
proval. Since the well had exhibited leaks both in the tubing and in a casing,
Unocal proposed to install an automatic shutdown valve activated by either an in-
crease in pressure or injection rate.
4. Following review- of available information, Unocal's application vas approved on
April 21 subject to installation of the alarms and shutdown, recording and submit-
ting the daily injection rate and well pressure information and performing a sub-
sequent temperature survey.
~. Actual injection did not begin until early August. While injecting, Unocal has
been recording daily injection rate and well pressures and has provided this in-
formation to the Commission. In support of this application, Unocal has submit-
ted a base-line and subsequent temperature log.
•
Mr. Hal Martin
December I, 2005
Page 2 of 2
6. Based upon analysis of the submitted logging information, there is no evidence
that the injected fluids are not being confined to the intended injection intervals.
The rate; pressure information has not indicated any further pressure integrity loss.
7. At this time, Unocal is not proposing to repair the well to restore full integrity.
8, An aquifer exemption is in effect for all aquifers lying directly below McArthur
River Field (Trading Bay Unit) [40 CFR 147.102(b)(2)(ii).]
Based on analysis of the submitted information, the Commission concludes that TBU K-
4RD exhibits one competent barrier to release of well pressure and that the installed
process alarms and automatic shutdown valve provide an additional layer of protection.
Accordingly, the Commission believes that the w-ell's condition does not compromise
overall well integrity so as to threaten the environment or human safety.
AOGCC's administrative approval to continue water injection in Trading Bay Unit K-
4RD [aka King Salmon 4RD] is conditioned upon the following:
1. Injection is limited to WATER ONLY;
2. Unocal shall monitor and record wellhead pressures [T/UO] (tubing/inner annu-
lus/outer annulus) and injection rate daily and submit this information to the
Commission monthly;
3. Unocal shall perform a temperature log every two years to demonstrate continued
production casing integrity;
4. The installed process alarms and shutdown valve shall be subject to testing similar
to production well pilots and safety valves.
Unocal shall immediately shut in the well and notify the AOGCC upon any meas-
urable change in well outer annulus pressure or any change in the injection
rate/pressure relationship; and
6. After well shut in, AOGCC approval shall be required to restart injection.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such
further time as the Commission grants for good cause shown, a person affected by it may
f le with the Commission an application for rehearing. A request for rehearing is consid-
ered timely if it is received by 4:30 PIVI on the 23rd day following the date of this letter,
or the next working day if the 23rd day falls on a holiday or weekend. A person may not
appeal a Commission decision to Superior Court unless rehearing has been requested.
ited December 1, 2005.
Cafhy P,lFoers
Commissioner
~,
~:~
,..- ~> -
7 7 _ ~
A
a ~ ;
:~
~ -J 4
~3
Y
.
~
.
'~
~ ~
,
1
~ ° .~%
)
Chevron
III
October 10, 2005
Commission Chair John Norman
Alaska Oil and Gas Conservation Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
Attn: Tom Maunder
)
J. Hal Martin
Optimization Engineer
Union Oil Company of California
P.O. Box 196247
Anchorage, AK 99519-6247,,Ø. ."
Tel 907 263 7675 /'
Fax 907 263 7847 /
Email martinh@Chevron:/·
/
,/.
)'
,l
¡/
I
/
f
I'
i'
y
/
,1
,l
.to.l'
~:( /C~
I \';\ i:&,':'::.~
/'
Oì.,~..,.:'r·· ..,
. J
/
J ~i~'
ji
~i'
¡I
I'
j'
REQUEST FOR ADMINISTRATIVE APPROVAI~/
UNDER AREA INJECTION ORDER 6 ,/'/ 5tJANNE[:) NOV 0 9 2005
WELL NO. K-4RD INJECTOR/'
KING SALMON PLATFORM /1
TRADING SAY UNIT )/
McARTHUR RIVER FIELD /'
,I
/
/
/
Dear Tom: //
.I
Union Oil Company of California re9¡~ests administrative approval under Area Injection Order 6,
Rule 9 for the continuation of inject,ibn of non-hazardous Class II fluids for King Salmon Platform
Well No. K-4RD Injector (Permit #;~730420) in Trading Bay Unit, McArthur River Field.
,1
i
To support this request, unocallubmits the following information and documentation:
1. Form 10-404 (attached6)/
2. Schematic (attached).'
3. MD and TVD plot of te, perature surveys (attached).
4. Maximum allowable in~ ction pressure calculation in graphical form (attached).
5. Brief/relevant well his()ry (below).
,
The King Salmon Platform Well No. K-4RD was redrilled and completed as a producer in 8/74 in
Hemlock Benches 1 and 2. In 5/77, Well K-4RD was worked over and converted to an injector
in Hemlock Benches 1-4. During the workover, the casing was tested to 3500 psi with 9.6 ppg
mud. In 2/88, the tubing/casing annulus was tested to 2500 psi. In 1992, efforts to again
eliminate the tubing-to-casing communication were unsuccessful and a waiver was obtained
from the AOGCC. In 12/98, perforations were added to G-Zone Benches 1-6 for waterflooding.
Temperature surveys were run in the well in 2/98,7/98, 11/00, 11/02, and 5/04 to confirm casing
integrity and that water is being injected and contained within the G-Zone and Hemlock
intervals. In 5/04. K-4RD was shut-in d~t~an;lrt~tt that developed between the 7"
Union Oil Company of California I A Chevron Company
http://www.chevron.com
')
)
Tom Maunder
AOGCC
October 10,2005
Page 2
and 9-5/8" casing. An evaluation of the wellhead indicated that it was not the path for
communication between the 7" and 9-5/8". In 7/05, after submitting a plan to restore waterflood
injection to the AOGCC, a baseline temperature survey was run and results reviewed with the
AOGCC. Injection was restored from 8/10/05 until 9/17/05 when the well was shut-in for a
follow-up temperature survey on 9/18/05. The well has been shut-in since.
With regard to the temperature anomaly at approximately 4250' MD (+/- 3800' 55) that has
been discussed with the AOGCC, Union Oil Company of California does not believe this is
indicative of an injection fluid leak. A possible interpretation is that this is a warming trend
caused by some type of formation fluid movement at that depth.
A calculation of the maximum allowable operating pressure (MAOP) is based on the strength of
the 9-5/8" casing, since the 7" casing is compromised by the 7" x 9-5/8" leak. Therefore, the
MAOP for K-4RD is 2281 psi. Union Oil Company of California plans to operate this well with a
MAOP on the 9-5/8" of 2050 psi.
Agreed upon earlier for the test injection period due to the 7" x 9-5/8" leak, Union Oil Company
of California has installed an alarm and a shut-in pressure limitation on the 13-3/8" casing at 250
psi. Similarly, we have also installed an injection rate alarm and shut-in which will be set
approximately 300 BWPD above the stabilized injection rate, which is currently projected to be
approximately 7800 BWPD.
In addition to the special alarm and shu~-in measures outlined above, Union Oil Company of
California will monitor and record daily injection rates and tubing and casing pressures on the
well and provide a report to the AOGCC on a monthly basis. A temperature survey will be run
every two years to insure the injected water is contained within the completion interval.
Please note also that McArthur River Field has an aquifer exemption per EP A
40CFR147.102b2ii.
Please call me at (907)263-7675 if you have any questions.
Sincerely,
dJ-AvL
Hal Martin
Optimization Engineer
Union Oil Company of California
JHM:jll
Attachments
Union Oil Company of California I A Chevron Company
http://www.chevron.com
P.O. Box 19-62417 Anchorage, AK 99519
STATE OF ALASKA
ALA; ) OIL AND GAS CONSERVATION COMI\ )ION
REPORT OF SUNDRY WELL OPERATIONS
AI3t:Jca Oil & Gas Cons. Commission
Stimulate U 't>ìf¡er l.{J . RffiCihWølnj Test I
WaiverD Time Extension 0 Anc
Re-enter Suspended Well 0
5. Permit to Drill Number:
Exploratory 0 173-042
Service 0 6. API Number:
50-733-20075-01
9. Well Name and Number:
K-4RD
10. Field/Pool(s):
McArthur River / Hemlock & G-Zone
RECEIV~O
OCT 11 2005
1. Operations Abandon U Repair Well U
Performed: Alter Casing 0 Pull Tubing 0
Change Approved Program 0 Operat. Shutdown 0
2. Operator Union Oil Company of California
Name:
3. Address:
Plug Perforations U
Perforate New Pool 0
Perforate 0
4. Current Well Class:
Development 0
Stratigraphic 0
7. KB Elevation (ft):
100
8. Property Designation:
Trading Bay Unit / King Salmon Platform
11. Present Well Condition Summary:
Total Depth measured 11439 feet Plugs (measured) 11352
true vertical 9858 feet Junk (measured) 11251
Effective Depth measured 11352 feet
true vertical 9781 feet
Casing Length
Structural
Conductor
Surface 2880
Intermediate 9952
Production 10605
Liner 1250
Size MD
TVD
Burst
Collapse
13 3/8" 61# J-55 2880
95/8" 47# N-80, P-110 9952
7" 29# N-80 10605
5" 18# N-80 11439
2778
8555
9119
9858
3090
6330
7020
10490
1540
3810
8160
10140
Perforation depth:
Measured depth: various 10532 - 11316
True Vertical depth: various 9055 - 9749
Tubing: (size, grade, and measured depth)
3 1/2
9.2# N-80
10127
Packers and SSSV (type and measured depth)
Baker F-1/Camco TRB 10050/291
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
NA
Treatment descriptions including volumes used and final pressure:
NA
13.
¡R~BDMS BFl 0 CT 1 2 2005
Oil-Bbl
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run temp surveys
Daily Report of Well Operations see Admin Approval
15. Well Class after proposed work:
Exploratory D Development D
16. Well Status after proposed work:
Oil 0 Gas 0 WAG D
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Service 0
GINJ D WINJ 0 WDSPL 0
sU~ö3~rÕ9So~t:¡f)I¡,;¥o S
Contact Hal Martin 263-7675
Printed Name Hal Martin
Signature ~ /J,~'L '
Title Optimization Engineer
Form 10-404 Revised 04/2004
Phone 263-7675
r-'~I(~'c!r ¡ r.. r
I '
Date 10/11/2005
Submit Original Only
t
UNOCALe
L
L
RKB to TBG Hanger = 35'
II
1
I I
'D
1,1 2
'D 3
II
n 4
~
""C"""D
I)
I) I)
I)
I)
I) I)
I)
.
)
SIZE WT
13-3/8" 61
~ 9-5/8" 47
9-5/8" 47
7" 29
7" 29
5" 18
Tubing:
3-1/2" 9.2
~
I) I)
I) ~v1.:..
I)~~
I) I)
I)
....
...
+/- 8300' .- Est TOC
NO. Depth
1 291 '
2 2277'
3 4261 '
4 5623 '
5 10050'
6 10 127'
')
Trading Bay Unit
King Salmon Platform
Well # K-4RD
Current Completion 5/16/77
CASING AND TUBING DETAIL
GRADE CONN TOP
J-55 35'
N-80 35'
P-I10 8471'
N-80 (tie-back run 6/3/69) 35'
N-80 9796'
N-80 BTC 10209'
BOTTOM
2880'
8471 '
9952'
9796'
10605 '
11439'
B-
L.
A
\
N-80
35'
10127'
BTC
JEWELRY DETAIL
Item
Camco TRB SSSV nipple (ID = 2.75")
KBUG Mandrel with dummy valve
KBUG Mandrel with dummy valve
KBUG Mandrel with dummy valve
Baker F -1 packer
3-112" Tubing tail (no nipple)
Hole in 9-5/8" casing between 8799' - 9406' as a
5 result of milling stuck DP after cementing T' liner.
Slickline/Fish/Fill Information:
A. 9/27/98: 2.25" LIB run to 11204'.
B. 5/2/04: Ran 2.00" GR and tagged liner top at @ 10,254'
RKB.
PERFORATION DATA
BTM ZONE SPF DATE COMMENTS
10560' G-l 6 12/29/98
10600' G-2 6 12/29/98
10635' G-2 6 12/29/98
10695' G-3 6 12/29/98
10755' G-4 6 12/29/98
10890' G-5 6 12/29/98
10965' G-6 6 12/29/98
11024' 11055' H-l 8
11071' 11096' H-2 4
11184' 11232' H-3 4/8
11232' 11316' H-4 8
PBTD = 11352' TD = 11439'
MAX HOLE ANGLE = 39°
O:\OOE\OOEFields\TBU\King\ Wells\K-04\K-4RDInj\Schematics\K4RD 5-16-77 Schem.DOC
6
~
TOP
10532'
10580'
106 1 0'
10655'
10710'
10805'
10940 '
REVISED: 3/31/05
DRAWN BY: JHM
IUnocal
r----
')
Well:IK-4RD
)
Field:IKing Salmon
--I
o
500
Pressure (psia)
2000 2500
3000
3500
4000
4500
1500
1000
o C" i~y
1000 - ~:ð:m'):
= ~_ 1~3/8';".'~:,..~ I
- C1Si~"¡"'-
2000 ~~ ~ _ '1\(11 ',' ~. ;
__ J. I " '
- ! ',. . ,
~ z r : · · ';', i
3000 f - r- ,- - - --r"~\. ¡-
ì I"
4000 _
4..:_
Pressure-Temperature Profile
1. Going in hole
2. Well Shut-in
3. 7 -14-05 vs 9-18-05
I '
I
!
. ¡..-----.
I
--.----
------
-
.....
0)
~
-
---..-..-
5000 ~_-~::~~..,.
-. .....--. .--.. - -.. ..- - - --- -_.-
_.h.._.._._ ...~_ ~__.
~
c
:E
I
.r.
.....
C-
O)
C
6000
I
__..L.
I
7000
.---.--
Top of
8000
9000
- -- - ._==..::.~_....:=:---._~.- - =..:: .~_-.I-',::'. ..' __.:.~-.:..~
. -- . -. I'--:'-·~· :'. ·1-' - __.n
-- - - ~ -
- --- . -
- -- -. -- .-- I .
. __.~In._ ~~_I _ - .---
-~-- -- -- --- --- -~_... - ---
, I
I
¡- ----
I
I
-
- --.--....- - - ._--
_ i_,.
. -- i
12000
60
90
100
110
120
130
140
150
70
80
Temperature (Deg. F)
I
¡ ~ 7 -14-05 Pressure - Perfs ~ Mandrel
1-9-5/8" -7"~5"
1-7-14-05 Temp -9-18-05 Temp
z 13-3/8"
-3-1/2" TBG
Report date: 10/10/2005
IUnocal
)
Well:IK-4RD
)
Field:IKing Salmon
3500
4000
o
o ç I I
~~¡ 1-· - i
1 000 _ I I
- I.~~:~.):
: ~--<' -,)1~3t~" i ~,! -
= ..'~_I~.C si ""_ I
_ ' . II I
2000 ¡ . .,'. I i
-t 'I I··
l£,.:.y-' .,.. -'r'
= z f i
3000 ! i ~----
m I'
- ~
4000 .;~-..,,-'-J~:- , . --.1.
I ~....~~ ~J = l .. .1 '=-~=~~;~;;ë;~:¿l-~'~~;~-;!r-~-_m-I
;; 5000 4i~ ~;~. :I~=:=~===::=:::::·~:< ~=~=:=d-:: "::='==:=:i:
~ ¡ I 1
..c
.....
C-
O)
c
~'~lJ' - ,:m. ... . ... -.:. -'--:1 .. _·_'=_u·.::::-.··..,,:::. -I-·_....-=~::_:
9000+ }~ !....G-zon~ 1----. ! ----+- J
~J-~~I
10000 ~__ ~ Hemlo~k I
.,-_L~___ _____
500
1000
1500
Pressure (psia)
2000 2500
3000
4500
I
I
, I
, "._,!
.~:-
Pressure-Temperature Profile
1. Going in hole TVD
2. \J\Jell Shut-In
i
I
I
1------
I
i
I
I
I
I
I
.,'J-
I.'
. - .. ,.","". --..
-1:-'-----
i
i
6000
7000
8000
----- '-..- ---....,,-
_._.._._...__n_..O_'_
11000
60
70
80
90
100
110
120
130
140
150
Temperature (Deg. F)
11-7-14-05 Pressure - Perfs
:-9-5/8" ~7"
1-7-14-05 Temp -9-18-05 Temp
.ð. Mandrel
z 13-3/8"
-3-1/2" TBG
~5"
Report date: 10/10/2005
)
)
í~."~~:\,. '. ~.:ß/; iìi1,'i i!:;7,::ì ¡ :¡:::¡J,'
il~W 2¡"/' ¡~ ill
\\. ~¡ i,' ~¡ ¡'F
'\ j I' 'I I!
:r1)~ i¡ i ,',' ,! Jj ¡:I
,~ ,_;!-Jj : I""k ::...::::3
:r'~ riP
i¡ Iii its
¡. i : f ¡I ::1
~:JJ U
(111
i '
!L.~
/-.
:¡1lJ
\'\"
p))
FRANK H. MURKOWSKI, GOVERNOR
A.I,A.SKA OIL AND GAS
CONSERVATION COMMISSION
333 W. pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Hal Martin
Optimization Engineer
Union Oil Company of California
P.O. Box 19-6247
Anchorage, Alaska 99519
Re: McArthur River K-4RD SCI-\NNEIJ; !J~PR 2 5 2005
Sundry Number: 305-093
" --'1, 3 ... ó If '-
t"", I
Dear Mr. Martin:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed form.
Please provide at least twenty-four (24) hours notice for a representative of the
Commission to witness any required test. Contact the Commission's petroleum field
inspector at (907) 659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such
further time as the Commission grants for good cause shown, a person affected by it may
file with the Commission an application for rehearing. A request for rehearing is
considered timely if it is received by 4:30 PM on the 23rd day following the date of this
letter, or the next working day if the 23rd day falls on liday or weekend. A person
may not appeal a Commission decision to Superio COlL"'1 unless rehearing has been
requested.
/'
DATED this vi day of April, 2005
Encl.
~ Ii".... '"".... f/ " ...........
STATE OF ALASKA C{1:{ t/lt;/O" , APR 1 {} Z005
AL )A OIL AND GAS CONSERVATION COMMlf »N l \'6 .
APPLICATION FOR SUNDRY APPROV A'- .~Ska Oil & Gas Cons. Commlss
20 AAC 25.280 (Jff <1-/2, I ç' Ancnnrag~
Abandon U Suspend 0 Operational shutdown U perforate"[j ~ Annular Dispos. U
Alter casing 0 Repair well 0 Plug Perforations 0 Stimulate 0 Time Extension 0 Other 0
Change approved program 0 Pull Tubing 0 Perforate New Pool 0 Re-enter Suspended Well 0 Return to Inj Test
2. Operator Name: UNION OIL COMPANY OF CALIFORNIA 4. Current Well Class: 5. Permit to Drill Numb, 1730420
(UNOCAL)
1. 1f~pe of Request:
3. Address:
7. KB Elevation (ft):
8. Property Designé;ltion:
11.
Total Depth MD (ft):
11459'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
10,532'-10,560' 10,580'-
10,60010,610'-10,635'
10,655'-10,695' 10,710'-
10,755' 10,805'-10,890'
10,940'-10,965' 11,024'·
11,055'; 11,071'-11,096';
11,184'-11,316'
Packers and SSSV Type:
Development
o
o
6. API Numbe 50 733 2007501
Exploratory 0
o
P.O. Box 19-6247 Anchorage, Alaska 99519· Stratigraphic
Service
100' RKB
9. Well Name and Number:
K-4RD
Trading Bay Unit
10. Field/Pools(s):
McArthur River / Hemlock & G-Zone
Total Depth TVD (ft):
9864'
Length
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft):
11352' 9769'
Junk (measured):
11251'
Plugs (measured):
11352'
Size
MD
TVD
Burst
Collapse
2880'
9952'
10605'
1250'
133/8" 61# J-55 2880'
95/8" 44# & 47# N-80 9952'
7" 29# N-80 10605'
5" 18# N-80 11459'
2778'
8556'
9108'
9864'
Perforation Depth TVD (ft):
9,055'-9,079' 9,097'-9,115'
9,124'-9,146' 9,163'-9,199'
9,21'2-9,252' 9,297'-9,372'
9,416'-9,438' 9,479'-9,507';
9,521'·9,543'; 9,621'-9,737'
Tubing Grade:
9.2#, N-80
3090
6330
7020
10490
Tubing MD (ft):
10127'
1540
3810
8160
10140
Tubing Size:
31/2"
Baker F-1 Pkr @ 10,050' MD & Cameo TRB
SSSV @ 291' MD.
Packers and SSSV MD (ft):
12. Attachments: Description Summary of Proposal ~
Detailed Operations Program 0 BOP Sketch 0
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
N/A
13. Well Class after proposed work:
Exploratory 0 Development 0 Service 0
15. Well Status after proposed work:
Oil 0 Gas 0 Plugged 0 Abandoned 0
WAG 0 GINJ 0 WINJ 0 WDSPL 0
Date:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title
Contact
Hal Martin 263-7675
Printed Name J I Hal Martin
Signature {fIj1-/t¡~
Phone
OfJ17 ¡In ¡.y¡rl 'fY1\I , tfA/6rl/flt;~
Date 7'/1 'Ior
COMMISSION USE ONLY
263-7675
Conditions of approval: Notify Commission so that a representative may witness
Sundry Number:
..::;' CJS:~ c.) 9' 3
Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0
Other. U~~\C\Jû \ ~-')<è" \;0 <:-ü~<.)::*- ~\Q~~"\'k \~ \ v-.S .é v.:J~ \' \~~á-\?""
~'\<ë.~"::>\..)c(.:. ~\) C'''' \'~~/S~ <:;~ fC"?s C,,~\)\·~~~ (.v\.~.\. \)Q \. "~'\ù..\~~ Ç>\'\O\" \a'\'\'... ~c....\\t-....~
~\\ O\,,£S--' . \a~ '\i'- aC<-é)~ \.,\J i ~ \0 5"~ ,~
SubsequentE !O<1ui: G'-\ \ \I...) I ~\'û'O.:\-~\Q \0 ~ 0-. \\oc1-IV\((~-\-s
Approv v(, cJ0., L;cb~~s~~£ij ~:::~~::ION /!II(
F0I1111~~~~ INSTRUCTIONS ON REVERS~1S L:; J/;:!+ ~-DuPlicate
)
t
'UNOCALe
RKB to TBG Hanger = 35'
L
SIZE WT
13-3/8" 61
9-5/8" 47
9-5/8" 47
7" 29
7" 29
5" 18
Tubing:
3-112" 9.2
~
2
3
~
I> I>
I>
:9
-\
4
+/- 8300' - Est TOC
TT
I>
I> I>
I>
I>
I>
I> I>
I>
..
NO. Depth
1 291 '
2 2277'
3 4261 '
4 5623 '
5 10050'
6 10127'
L
Trading Jay Unit
King Salmon Platform
Well # K-4RD
Current Completion 5/16/77
CASING AND TUBING DETAIL
GRADE CONN TOP
J-55 35'
N-80 35'
P-110 8471'
N-80 (tie-back run 6/3/69) 35'
N-80 9796'
N-80 BTC 10209'
BOTTOM
2880'
8471 '
9952'
9796 '
10605'
11439'
N-80
10127'
BTC
35'
JEWELRY DETAIL
Item
Camco TRB SSSV nipple (ID = 2.75")
KBUO Mandrel with dummy valve
KBUO Mandrel with dummy valve
KBUO Mandrel with dummy valve
Baker F -1 packer
3-1/2" Tubing tail (no nipple)
Hole in 9-5/8" casing between 8799' - 9406' as a
5 result of milling stuck DP after cementing 7" liner.
6
Slickline/Fish/Fill Information:
A. 9/27/98: 2.25" LIB run to 11204'.
B. 5/2/04: Ran 2.00" OR and tagged liner top at @ 10,254'
RKB.
B -
L
~
A
TOP
10532'
10580'
10610'
10655 '
10710'
10805 '
10940 '
BTM
10560'
10600'
10635'
10695'
10755'
10890'
10965'
PERFORATION DATA
ZONE SPF DATE COMMENTS
0-1 6 12/29/98
0-2 6 12/29/98
0-2 6 12/29/98
0-3 6 12/29/98
0-4 6 12/29/98
0-5 6 12/29/98
0-6 6 12/29/98
11024' 11055' H-1 8
11071' 11096' H-2 4
11184' 11232' H-3 4/8
11232' 11316' H-4 8
PBTD = 11352' TD = 11439'
MAX HOLE ANGLE = 39°
O:\OOE\OOEFields\TBU\King\Wells\K-04\K-4RDInj\Schematics\K4RD 5-16-77 Schem.DOC REVISED: 3/31/05
DRAWN BY: JHM
)
)
UNOCALe
Hal Martin
Optimization Engineer
Dir 907 263-7675
Fax 907 263-7847
April 14, 2005
Tom Maunder
State of Alaska
Alaska Oil and Gas Conservation Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
RECEIVED
APR 1 6 2005
Alaska Oil & Gas Cons. Commission
Anchorage
Re: Form 10-403 Submittal
Proposed Plan to Restore Wateñlood Injection
King Salmon Platform Well No. K-4RD
Trading Bay Unit
McArthur River Field
Dear Tom:
As a follow up to our recent discussion, Unocal is proposing the following plan to
restore waterflood injection in the King Salmon Platform Well No. K-4RD (Permit
# 1730420), Trading Bay Unit, McArthur River Field.
1) With well remaining shut-in, run baseline temperature survey.
2) Obtain permission from AOGCC to temporarily inject filtered inlet water.
3) Install the following monitoring equipment:
a) Alarm and shut-down system on 13-3/8" casing set at 250 psi.
b) Alarm for upper and lower limits settings on injection rate (to be
determined after injection initiated) to monitor indications of downhole
changes below 13-3/8".
4) Place well on injection for 4 - 6 weeks.
5) Run follow-up temperature survey to confirm integrity of 9-5/8" casing.
6) Shut well in and apply for AOGCC Administrative Approval to resume
sustained injection.
7) After injection is restored, monitor well data daily and report monthly.
8) Repeat temperature survey every two years.
ORIGINAL
Unocal Alaska f Union Oil Company of California 909 W. 9th Ave. P.O. Box 196247 Anchorage. AK 99519-6247
K-4RD
Page 2
. . April 14, 2005
)
)
Well K-4 (original well), drilled and completed in early 1968, was worked over in
6/69, during which a 7" tie-back was run and cemented to cover a portion of the
9-5/8" casing (damaged during well work at depth between 8799' and 9406'). In
8/74, Well K-4RD was drilled (sidetracked out of 7" casing at 10605') and
completed in the Hemlock formation as a producer. In 5/77, Well K-4RD was
worked over and converted to a waterflood injector. The well developed 3-1/2"
tubing x 7" casing communication in 1992 and a variance was granted by the
AOGCC. Various attempts to locate and repair the tubing leak were at times
temporarily successful, but since the failed MIT on 2/26/97, temperature surveys
have been run every other year (2/98, 11/00, 11/02, and 5/04). In 12/98, G-Zone
formation perforations were added. In 5/04, Well K-4RD also developed
communication between the 7" and 9-5/8" and has since been shut-in.
A current schematic of Well K-4RD is attached.
Please review the enclosed Form 10-403 and let me know if you have any
questions.
Sincerely,
JL //¡~L~
Hal Martin
Optimization Engineer
Unocal Alaska
Unocal Alaska I Union Oil Company of California 909 W. 9lh Ave, P.O. Box 196247 Anchorage, AK 99519-6247
)
)
NOTE TO FILE
Trading Bay Unit (TBU) K-04RO
PTO 173-042 302-394/305-093
Unocal has requested to return this well to water injection service to demonstrate
continued integrity and isolation/placement of fluids into the intended zones. Unocal has
previously demonstrated integrity with temperature surveys; however there appears to
be pressure communication in the wellhead to the 9-5/8" x 7" annulus. This note
evaluates Unocal's request and recommends accepting their work proposal.
This well was last evaluated in April, 2003 and approval was given to continue water
injection with known tubing x inner annulus (T x IA) communication. Please refer to
Sundry 302-394 in the well file. In May 2004, Unocal reported communication into the
casing x casing annulus and the well has been SI since. Unocal did submit a follow-up
sundry, however the waiver process had changed to requiring an Administrative
Approval. Unocal's current request is not for Administrative Relief, the request is to
conduct diagnostic testing so that they may then apply for the Administrative Relief.
Unocal is proposing to obtain a baseline temperature survey and then initiate injection
for 4 to 6 weeks and then conduct a follow-up survey. Comparison of the temperature
surveys should provide the diagnostic information necessary to conclude that the
injected water is being place into the desired formation. In addition to initiating injection,
Unocal is proposing to install a pressure sensor on the 13-3/8" x 9-5/8" annulus set to
SO injection should the pressure in that annulus exceed 250 psi. Unocal is also
proposing to, have high and low injection rate alarms on the well. Once steady injection
is established in the well, a sudden increase in the rate can be indicative of a casing
. failure. A high pressure SO has been incorporated on another well on King Salmon.
The sensor setting and function of the SO valve are tested as part of the normal surface
safety valve testing operations.
Area Injection Order 5 allows injection into Trading Bay Unit, McArthur River Field. The
BHL of well K-04RO is located in the covered area. The portion of aquifers beneath
Cook Inlet described by a 1/4 mile area beyond and lying directly below the Trading Bay
Unit are exempted for Class II injection activities by 40 CFR 147.102(b)(2)(B) and 20
MC 25.440(c). Granting Unocal's request will not endanger any fresh water.
I recommend acceptance of Unocal's proposed diagnostic plan as well as the installation
of the pressure and rate sensors and "shut-downs" as proposed. Unocal should keep
this well to the monthly monitoring report.
~~
Tom Maunder, PE
Sr. Petroleum Engineer
April 18, 2005
G:\common\UIC File Reviews\050418-TBU K-04RD.doc
)
')
FRANK H. MURKOWSKI, GOVERNOR
ATtASKA OIL AND GAS
CONSERVATION COMMISSION
November 16,2004
333 W. ]TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Mr. Larry Greenstein
Production Technician
UNOCAL
P.O. Box 196247
Anchorage, AK 99516-6247
Re: Trading Bay Unit (TBU) K-4 \1.t>
PTD: 173-042 Sundry Application: 304-194
Dear Mr. Greenstein:
We are returning, without approval, the Application. for Sundry Approval (Form 403)
relating to the above-referenced well because the relief you request needs to be sought
through a different procedure and the wellbore conditions subsequently changed
following submitting the original request.
AIO 5 regulates injection activities in the Trading Bay Unit, McArthur River Field.
When an injection well exhibits an integrity loss, the injection order requires that the
Commission be notified and that the Operator submit a plan for corrective action.
Corrective action for purposes of an integrity loss means proposing to accomplish the
physical well work necessary to repair the integrity loss. A corrective action plan should
be submitted as an attachment to Form 403 per usual practice.
If it is proposed to keep a well in operation without accomplishing a repair that would
restore complete integrity, a request for Administrative Relief ("AR") in accord with
Rule 9 of AIO 5 should be submitted.
If you desire to request AR, your application should be similar to the attachment
submitted with the sundry, however it should also include an evaluation/verification of
the remaining barrier(s) that serve to confine injection fluids to the wellbore,
consideration of trapped pressures and the consequence thereof in any well bore "space"
and an explanation of the management decision not to repair the well.
Addressing the remaining barriers necessary to confine fluid to the wellbore is most
important for this well since on May 26, 2004 you reported that there was not only
communication into the 3-1/2" x 7" annulus, but also into the 7" x 9-5/8" annulus.
According to the monthly monitoring reports you have been submitting, the well has been
shut in since the new communication was reported. Since the new communication was
SCANNED NO\! ;(~ 3 2004
')
)
~
reported, no new information regarding resolution of that communication has been
received.,
Should you have any questions on this process, please contact Jim Regg at 793-1236 or
Tom Maunder at 793-1250.
aniel T. Seamount, Jr.
Commissioner
DATED this£day of November, 2004
^)
Unocal Alaska
Union Oil Company of California
909 West 9th Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
Telephone (907) 263-7661; Fax (907) 263-7847
')
UNOCAL8
Larry P. Greenstein
Prodction Technician
Date: May 21,2004
State of Alaska
Alaska Oil and Gas Conservation Commission
333 w. ih Ave., Suite #100
Anchorage, AK 99501-3539
Attn: Tom Maunder
Re: McArthur River Field K-4RD Water Injector
Request for Continuation of Variance
Dear Mr. Maunder,
This letter is to request a continuation of the MIT variance for the King Salmon K-4RD water
injector. (Permit # 1730420 API # 50-733-20075-01). This well has tubing / casing
communication and has been injecting with a variance since September 1998.
The recent temperature survey run on 5/1/2004 matches the last two surveys run on 11/17/2002
and 11/25/2000 in character showing no cooling anomalies above the packer. The older
Hemlock injection zones are clearly identified as well as the Gzone injection zones perforated
on 12/29/1998
I n support of this request, the temperature survey comparison plot and a well bore schematic
have been attached.
Thank you for your consideration and if you have any questions regarding this, please contact
me at 263-7661 or Hal Martin at 263-7675.
Sincerely,
Larry P. Greenstein
cc:
Dave Cole
Hal Martin
MIT book
Well File
nr'~'~':~t-
RECE\VED
MAY 252004
Cons. commission
kiî~horage
&
A\aSK(,i
Abandon U Suspend D
Alter casing D Repair well D
Change approved program D Pull Tubing D
2. Operator Name: UNION OIL COMPANY OF CALIFORNIA
(UNOCAL)
1. Type of Request:
3. Address:
7. KB Elevation (ft):
8. Property Designation:
11.
Total Depth MD (ft):
11459'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
10,532'-10,560' 10,580'-
10,60010,610'-10,635'
10,655'-10,695' 10,710'-
10,755' 10,805'-10,890'
10,940'-10,965' 11,024'-
11,055'; 11,071'-11,096';
11,184'-11,316'
Packers and SSSV Type:
^, STATEOFA~SM ,
AL ¡tA Oil AND GAS CONSERVATION COMMk...ioN
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280
Operational shutdown U
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Perforate U Waiver U
Stimulate D Time Extension D
Re-enter Suspended Well D
5. Permit to Drill Num
Annular Disp .
ther []
ARIANCE
1730420
Development
P.O. Box 19-6247 Anchorage, Alaska 9951£ Stratigraphic
D
D
1540
3810
8160
10140
Exploratory D
Service []
100' RKB
9. Well Name and Number:
Trading Bay Unit
10. Field/Pools(s):
Total Depth TVD (ft):
9864'
Length
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft):
11352' 9769'
Size MD
Burst
Collapse
Junk (measured):
11251'
2880'
9952'
10605'
1250'
133/8" 61# J-55 2880'
9 5/8" 44# & 47# N-80 9952'
7" 29# N-80 10605'
5" 18# N-80 11459'
3090
6330
7020
10490
Tubing MD (ft):
10127'
/9108'
9864'
Tubing Grade:
9.2#, N-80
Perforation Depth TVD (ft):
9,055'-9,079' 9,097'-9,115'
9,124'-9,146' 9,163'-9,199'
9,21 '2-9,252' 9,297'-9,372'
9,416'-9,438' 9,479'-9,507';
9,521'-9,543'; 9,621'-9,737'
Tubing Size:
31/2"
Baker F-1 Pkr @ 10,050' MD & Cameo
SSSV @ 291' MD.
Packers and SSSV MD (ft):
N/A
Abandoned
WDSPL
D
D
12. Attachments: Description Summary of Proposal U
Detailed Operations Program D BOP Sketch D
14. Estimated Date for
Commission Representative:
17. I hereby certify that the foregoing is true and correc~¡Ío the best of my knowledge. Contact
Printed Nam0 Larry P. Gr;;')stein / Tnle Production Technician
SignatureC><U~ f! /\IA..i~Jl/~hone 263-7661 Date
f/ COMMISSION USE ONLY
/
Conditions of approval: Notify Commission so ¡at a representative may witness
BOP Test D/
I
ì
Commencing Operations:
16. Verbal Approval:
Plug Integrity D
Other:
Subsequent Form Required:
13. Well Class after proposed work:
Exploratory D Development
15. Well Status after proposed work:
Oil D Gas D Plugged
WAG 0 GINJ D WINJ
D
Service []
D
[]
Date:
Larry P. Greenstein 263-7661
_~/ól-;jD i
Sundry Number:
30 '/- /?1
MechanicallpO--"':O.. .--. n
n
I nro"!:!tinn (,La~r~nrA
APPLICATION RETURNED 11/11/04
NOT APPROVED BY COMMISSION
RECEIVED
MAY 25 2004
,ka OU&
RBDMS BFL NOV 2 2 @) RIG I N A L BY ORDER OF
Cons. Commissior
Anchorage
COMMISSIONER
THE COMMISSION
Date:
Approved by:
Form 10-403 Revised 12/2003
INSTRUCTIONS ON REVERSE
Submit in Duplicate
UNOCAL8
RKB to TBG Hanger = 35'
L
~
2
L
X X3
L
~
§
LAST TAG @ 11210'
w/2.70" GR on
11/25/00
PBTD = 11352' TD = 11439'
MAX HOLE ANGLE = 39°
K4RDsch
)
~
SIZE WT
13-3/8" 61
9-5/8" 44&47
7" 29
7" 29
5" 18
Tubing:
3-1/2" 9.2
NO. Depth
1 291 '
3
4
~
4
TOP
10532'
10580'
10610'
10655'
10710'
10805 '
10940 '
BTM
10560'
10600 '
10635'
10695'
10755'
10890 '
10965 '
11024' 11055' H-l
11071' 11096' H-2
11184' 11232' H-3
11232' 11316' H-4
Trading Jay Unit
King Salmon Platform
Well # K-4RD
Current Completion 5/16/77
CASING AND TUBING DETAIL
GRADE CONN TOP
J-55 35'
N80 35'
(tie-back to surface) 35'
N-80 9796'
N-80 BTC 10209'
BOTTOM
2880'
9952'
9796'
10605'
11439'
N-80
BTC
35'
10127'
JEWELRY DETAIL
10050'
10127'
Item
Camco TRB SSSV nipple (ID = 2.75",
Kinley Caliper = 2.872")
Baker F -1 packer
3-1/2" Tubing tail (no nipple)
PERFORATION DATA
ZONE SPF DATE COMMENTS
0-1 6 12/29/98
0-2 6 12/29/98
0-2 6 12/29/98
0-3 6 12/29/98
0-4 6 12/29/98
0-5 6 12/29/98
0-6 6 12/29/98
8
4
4/8
8
REVISED: 9/27/98
DRAWN BY: TAB
4,'
40
0'
500'
...
1 ,000' ~
1,500'
2,000' -:
2,500' ~
3,000' -:
3,500'
4,000'
4,500'
5,000'
5,500'
6,000'
6,500'
7,000'
7,500'
8,000'
8,500'
9,000'
9,500'
10,000'
10,500'
11,000'
11,500'
5/14/2004
) ')
King Salmon
K-4RD Temp Surveys
5/1/04 MIT Temp Survey
60 70 80 90 100 110 120 130 140 150
50
\
- 19-5/8" Csg \
13-1/2" Tbg
.r IT' Liner I
~
Pkr @ 10,050'
Perforations 12/29/1998 Gzone
G1 to G6 10,532' to 10,940'
.- 15-1/2" Liner I
a..
I
1
iÌ
J
-11/25/00 Survey after 12 hr SI
j
1
-11/17/02 Survey after 12 hr SI RIH
-5/1/04 Survey after 12 hr SI- RIH
..
-.:
Perforations Hemlock
B1 to B4 11,352' to fill
O:\OOE\OOEFields\TBU\King\Wells\K-04\K-4RDlnj\Surveys\T emperature\
K-4RD 5-1-04 & 11-17-02 & 11-25-00 Surveys.xls
Depth vs Temp 2004
Re: Unocal Cook Inlet FW: K-4 Shut in
)
)
Jeff,
This is to let you know that the water flood operator s/r K-4 King Salmon
water flood well @ 0415 hrs 5/6/2004 due to high pressure on 9 5/8". The
operator first noticed the increase to 2200 # on the 9 5/8" @ 2000 hrs on
5/5/2004. The operator bled 9 5/8" down to 110#, at 0045
hrs the operator noticed the pressure on 9 5/8" was back up to 1690 #.
A check on the well again at 0215 hrs showed the 9 5/8 " was up to
2020 #. The operator again bled the well down to 140 #, a check of the
well at 0415 hrs showed the well had again pressured up and the
operator s/r the well at this time.
Wayne Johnson and r will be calling you at 0800 hrs to follow up on
this.
Ken Sides
Lead Operator
King Salmon Platform
Phone (907) 776 6690
Fax (907) 776 6695
30f3
5/26/2004 1: 12 PM
Re: TBU K-4 and MUCi
)
)
Subject: Re: TBU K-4 and MUCi
From: Thomas Maunder <tom - maunder@admin.state.ak.us>
Date: Wed, 03 Nov 2004 11:28:53 -0900
To: Larry Greenstein <greensteinlp@unocal.com>, Hal Martin <martinh@unocal.com>
Hal and Larry,
The K-4 sundry is still pending over here.
wellhead communication and determination on
Tom Maunder, PE
AOGCC
Has there been any resolution on the
the proposal for allowable pressure.
Thomas Maunder wrote:
Hi Larry and Hal,
What is the status (stati) on these two problem children??
Last I heard, there was work underway to resolve the well head communication on
K-4 or look at the pressure rating of the 9-5/8" casing. Any resolution??
How about MUCI, I believe the pressures had been successfully bled down. Any
further resolution??
A pressure plot of information on MUCI since the communication event (if
available) would be appreciated.
Thanks in advance. Call with any questions.
Tom Maunder, PE
AOGCC
1 of 1
11/18/2004 12:53 PM
RE: TBU K-4 and MUCi
')
)
Subject: RE: TBU K-4 and MUCi
From: "Martin, J. Hal" <martinh@unocal.com>
Date: Thu, 01 Jul2004 17:26:41 -0800
To: Thomas Maunder <tom_maunder@admin.state.ak.us>
CC: Larry Greenstein <greensteinlp@unocal.com>
Tom,
Both are on me.
For K-4RD, the well head does not appear to be the issue, so as we
discussed earlier, I need to come up with the max allowable pressure
calculations for the variance on K-4RD.
For MUC 1-2, I am trying to get a better handle on the value of
waterflood injection from MUC 1-2 to help justify the further wireline
work. The spinner was fairly inconclusive, so we are considering a
caliper survey and then possibly another spinner, if needed (now that
the outfall line from GP Tank Farm is thawed out, we can circulate more
water around at higher rates to help locate the leak). Attached is the
latest pressure info on MUC 1-2.
Thanx,
Hal
-----Original Message-----
.From: Thomas Maunder [mail t:..S?._:_~om maunder@admin. state. ak. us]
Sent: Thursday, July 01, 2004 2:47 PM
To: Larry Greenstein; Hal Martin
Subject: TBU K-4 and MUCi
Hi Larry and Hal,
What is the status (stat i) on these two problem children??
Last I heard, there was work underway to resolve the well head
communication on K-4 or look at the pressure rating of the 9-5/8"
casing. Any resolution??
How about MUC1, I believe the pressures had been successfully bled
down. Any further resolution??
A pressure plot of information on MUC1 since the communication event (if
available) would be appreciated.
Thanks in advance. Call with any questions.
Tom Maunder, PE
AOGCC
-- - .- -. . - .-
: Content-Description: MUd CVI-12 DaiOlY60P4reslsure
. an 0 ume .x s
1-2 Daily Pressure and Volume 0604.xls ¡ Content-Type: application/vnd.ms-excel
. Content-Encoding: base64
1 of 1
8/4/2004 1: 12 PM
Re: May's Waivered Well Report
")
)
Subject: Re: May's W aivered Well Report
From: Thomas Maunder <tom - maunder@admin.state.ak.us>
Date: Thu, 03 Jun 200408:10:55 -0800
To: "Jim Regg @ AOGCC" <jim_regg@admin.state.ak.us>
Jim,
Regarding his reference to K-4RD, I have a sundry with the required temperature
survey. Doesn't look anomalous. The other issue is they have reported communication
at the wellhead from the 7" x tbg annulus into the 7" x 9-5x8" annulus. Both 7" and
9-5/8" corne back to surface. I am waiting on a determination of max injection
pressure allowed with the new communication. Based on the pressure history, the
9-5/8" casing should be adequate for the injection pressure with probably a 100%
margin. Hopefully Hal will get back with the information shortly.
Tom
Greenstein, Larry P wrote:
Hi Torn & Jim,
Here is May's monthly report. Overall, the May data looks pretty stable. There
are getting to be fewer and fewer data entry spikes showing up as bad readings in
the database, but we have not been able to eliminate them all...yet.
Most of the plots show no anomalies. The K-4RD well temp survey questions are
being fielded by Hal Martin. An-21, 25, 32, 38 & 46 show a slow trend up in May
on' tubing & casing pressure maybe related to the seasonal temperature changes we
have seen before. We'll keep an eye on this trend.
Bottom Line...I don't see any obvious examples of a well loosing control of the
injected fluids downhole.
Lårry
«Unocal_WW_Report_May2004.xls»
1 of 1
6/3/2004 8:23 AM
Re: Unocal Cook Inlet FW: K -4 Shut in
')
)
Subject: Re: Unocal Cook Inlet FW: K-4 Shut in
From: Thomas Maunder <tom_maunder@admin.state.ak.us>
Date: Wed, 26 May 2004 13:11:16 -0800
To: "Martin, J. Hal" <martinh@unocal.com>
CC: "Greenstein, Larry P" <greensteinlp@unocal.com>
Hal,
What you propose with regard to calculating a new MASP is appropriate. Looking at
the monthly reports, if the pressures remains essentially the same the 9-5/8"
casing should be OK. But you all need to make that determination and send us the
information. I will await that information prior to processing the sundry.
Tom
Martin, J. Hal wrote:
Tom,
We attempted to repair the hanger leak with packing, but w/o a
successful result. At this time, I don't know of any other
options/plans to repair the wellhead. '
With regard to the chatter, I think we plotted all the data points,
which were taken at l/second, but need to talk to Larry to know exactly
what data the plot he used is pulled from. I would think it's the same.
Thanx,
Hal
-----Original Message-----
From: Thoma s Ma unde r [~?:n~n~n~.g_..:,..!:g.~-~9:,~.~q~F@ admi nm:m~n~n9.:.~n~.--:..?:.~...:..\~.§!.]
26, 2004 11:57 AM
To: Martin, J. Hal
Subject: Re: Unocal Cook Inlet FW: K-4 Shut in
Sent: Wednesday, May
Thanks Hal,
Based on your message, it appears that there is no plan to effect a repair. Is
that correct??
I agree, the temperature survey doesn't appear to have any anomalies. There is
much less "chatter"
in the plot line. I wonder if few points were plotted.
Tom
Martin, J. Hal wrote:
Tom,
Larry and Jeff are out this week and I can't seem to locate a copy of what was
sent to you.
I'll try to answer the question.
The communication is in the tbg hanger (leaks when pressure reaches I
1000 psi). We have the well shut-in until a new calculation of the max
10f3
5/26/2004 1: 12 PM
Re: Unocal Cook Inlet FW: K-4 Shut in
20f3
')
')
allowable injection pressure (based on casing limitations) is calculated and
submitted to you for approval.
The temp survey demonstrates that there is/has been no anomalous (sp?) leakage
through the casing.
Thanx,
Hal
-----Original Message-----
From: Thomas Maunder [rnailto: tom maunder@admin. state. ak. us]
S en t: We dne s da y, Ma y 26":""""2-õ"ë>4'"''''11-;-"Q-6''''''ÄM''''''''''''''''-'''''''''''.......................................................................-.,..............
To: Greenstein, Larry P
Cc: Martin, J. Hal
Subject: Re: Unocal Cook Inlet FW: K-4 Shut in
Larry and Hal,
Here is a message that Jeff copied to you all as well as others
regarding TBU K-4. I have the sundry with the temperature survey. What
was the resolution of the communication?? I looked at the latest pressure report
and at least for April there didn't appear to be anything unusual on the tubing
and IA pressures. Thanks.
Tom Maunder, PE
AOGCC
Dolan, Jeff J wrote:
Tom, Jim.
The message is to notify you that we shut in K-4 water injector this morning
due communication developing between the 7" and 9 5/8" casings. The platform
will schedule an inspection of the surface equipment immediately. Initial look
at the data, indicates that the leak developed when the well was restored to
service after the temperature survey on 5/1/2004 but developed slowly until
last night.
Regards¡
* /Jeff Dolan/*
*Technical Support*
*Cook Inlet Assets*
*Alaska Business Unit*
*Unocal 76*
*Voice 907.263.7807*
*Fax 907.263.7847*
*Email* * dolanjj@unocal.com * <ffiailto:dolanjj@unocal.coffi>**
-----Original Message-----
*From:* Sides, Ken R
*Sent:* Thursday, May 06, 2004 6:59 AM
*To:* Dolan, Jeff J
*Cc:* Martin, J. Hal¡ Johnson, Wayne E¡ Condon, Dave
*Subject:* K-4 Shut in
5/26/2004 1: 12 PM
Unocal Alaska
Union Oil Company of California
909 West 91h Avenue, P.O. Box 196247
Anchorage. Alaska 99519-6247
Telephone (907) 263-7661: Fax (907) 263-7847
t 73- Olfd--
UNOCAL8
,. .
Larry P. Greenstein
Prodctlon Technician
Date: August 2,2004
State of Alaska
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave., Suite #100
Anchorage, AK 99501-3539
Attn: Tom Maunder
Re: McArthur River Field K-4RD Water Injector
Request for Continuation of Variance
Dear Mr. Maunder,
This letter is to request a continuation of the MIT variance for the King Salmon K-4RD water
injector. (Permit # 1730420 API # 50-733-20075-01). This well has tubing / casing
communication and has been injecting with a variance since September 1998.
The recent temperature survey run on 5/1/2004 matches the last two surveys run on 11/17/2002
and 11/25/2000 in character showing no cooling anomalies above the packer. The older
Hemlock injection zones are clearly identified as well as the Gzone injection zones perforated
on 12/29/1998
In support of this request, the temperature survey comparison plot has been attached.
Thank you for your consideration and if you have any questions regarding this, please contact
me at 263-7661 or Hal Martin at 263-7675.
;i; P~1~~
Larry P. g:enstein
cc:
Dave Cole
Hal Martin
MIT book
Well File
STATE OF ALASKA .
A~ :<A OIL AND GAS CONSERVATION COMM( ON
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
Operational shutdown 0
Plug PerforaMns D
Perforate New Pool D
4 Current Well Class
Abandon 0 Suspend 0
Alter casing D Repair well D
Change approved program D Pull Tubing D
2 Operator Name UNION OIL COMPANY OF CALIFORNIA
(UNOCALI
1 Type of Request
3 Address
7 KB Elevation (ft).
8. Property Designation
11
Total Depth MD (ft)
11459'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft).
10,532'-10,560' 10,580'-
10,60010,610'-10,635'
10,655'-10,695' 10,710'-
10,755' 10,805'-10,890'
10,940'-10,965' 11,024'-
11,055'; 11,071'-11,096',
11,184'-11,316'
Packers and SSSV Type'
12. Attachments:
Perforate 0 Waiver D Annular Dlspos D
Stimulate D Time Extension D Other []
Re-enter Suspended Well D VARIANCE
5 Permit to Dnll Numt
1730420
Development
D
D
Exploratory D
Service [] 6 API Numbe 50 ## 2007501
POBox 19-6247 Anchorage, Alaska 99519. StratigraphiC
100' RKB
9 Well Name and Number
K-4RD
Trading Bay Unit
10 Fleld/Pools(s)
McArthur River 1 Hemlock & G-Zone
Total Depth TVD (ft):
9864'
Length
Effective Depth MD (ft)
11352'
Plugs (measured)
11352'
Junk (measured):
1 1251 '
9769'
MD
Collapse
Size
TVD
Burst
'\
2880'
9952'
10605'
2778' 3090 1540
8556' 6330 3810
9108' 7020 8160
~864' 10490 10140
b\; Tubong Grade Tubing MD (ft).
9.2#, N-80 1 0 127'
1250'
Baker Pkr @ 10 050' MD & Camco TRB
SSS @ 291' MD
Packers and SSSV MD 1ft).
U
BOP Sketch D
13. Well Class after proposed work'
Exploratory D Development D Service 0
15. Well Status after proposed work.
Oil D Gas D Plugged D Abandoned D
WAG D GINJ D WINJ 0 WDSPL D
NIA
Date:
17. I here certify that the foregoing is true and correct to the best of my knowledge.
Contact
Larry P. Greenstein 263-7661
Printed Name ^ Ljrry p, Gree;;,ein
S;gnature (/101 p ~tikdl'°ne
Title
263-7661
Production Technician
Date
8/2/2004
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness
Sundry Number
(fÞ.?j)O
Plug Integrity
Other:
Subsequent Form ReqUired
D
BOP Test D
D
LocaMn Clearance
D
Mechamcallntegrity Test
ORIGINAl.
......
tRØS 8ft
~U6 1 0 1fW"
COMMISSIONER
BY ORDER OF
THE COMMISSION
Date
Approved by
Form 1 0-403 Revised 1 2/2003
INSTRUCTIONS ON REVERSE
Sutlmlt In Duplicate
40
0' ~ . --.. -
¡,
500' ~
~
I.
1 ,000' ~
~
,
.
1 ,500' ~
ï:
[
2 000' )
, ~
~
i
2,500' ",
t
i'
3,000' ~
I
3,500'
ij
¡
4.000' !
i
f
i
4,500' ~
5,000' ,
5,500' :
6,000' J.
6,500' ~
7,000' ¡
t
r
7,500'
1
1
8,000' :
(
8,500' 1
9,000' ~
¡
9,500' ì
I
10,000' t
t
10,500' 'i
i
~
11,000'
11 ,500' t
8/2/2004
50
60
- ""'~I;----.~.~:-:" ~- A_._.-
80
"
':'..
I.
'\'
...-- 19-5/8" Csg' I
\
'11
",'I
I:~f¡: i
:~',:
,'\'I
'1,:;,1'
:~'¡I
';' 111
...
~ '
I'
13-1/2" Tbg
r'¡
, "
,- 17" Liner 1
rI
. ,
"
70
King Salmon
K-4RD Temp Surveys
5/1/04 MIT Temp Survey
....;...
IPkr @ 10,050'
Perforations 12/29/1998 Gzone
G1 to G6 10,532' to 10.940'
-,
IIooI
+- 15-1/2" Liner 1
l
90
100
110
120
130
140
150
~- 'f.:- - Ji¡¡- --. .;;_-:-.~ - 4t. ~7-1:-.-':-_-=- ;"1--~~~--="'" ";. "IN"""."S::' -~t.. ~ :A.r \.f7i. -_.il.;.~'~\.-';::''¡'''' i'I:i"" ..-;,..u-. n'" ""1I.VUfE'.1i\.:¡y, -v: ,-)..ml' yt--;¡:
~
¡
~
~
¡
~
-I
~
~
- 11/25/00 Survey after 12 hr SI
-11/17/02 Survey after 12 hr SI RIH
-5/1/04 Survey after 12 hr 81- RIH
~
i
¡
i
¡
~
1
I
'~
r
!
~
J
Perforations Hemlock
B1 to 84 11,352' to fill
C \Documents and SettingslgreenlplLocal SettingslTemporary Internet Files\OLKF\
K-4RD 5-1-04 11-17-02 11-25-00 Surveys. xis
Depth vs Temp 2004
NOTE TO FILE
Trading Bay Unit (TBU) K-04RD
PTD 173-042 302-394
Unocal has submitted a temperature survey to demonstrate that this injection well does
not present any risk to resources or fresh water. This note evaluates Unocal's request
and recommends accepting the survey as proof of integrity.
This well was originally drilled as a production well and was converted to injection
service in May 1977. With minor exceptions, the well has been in service since.
According to the well file, additional perforations were added in the G zone in 1998. The
well has had known tubing x IA communication since as early as 1987. The novel
addition to this well completion is that the 7" liner was tied back when the well was
sidetracked so the well has both 7" and 9-5/8" casing back to surface. The
communication is to the 3-1/2" x 7" annulus. No communication is evident to the 7" x 9-
5/8" annulus. In 1998, Unocal performed a coil tubing cleanout to remove scale and a
caliper survey that did locate holes in the tubing. Unocal set a composite bridge plug
below the packer and performed a combo MIT of 3-1/2" and 7" tubulars. The MIT was
successful. Subsequent to that work Unocal performed temperature surveys to
demonstrate that the injected water was being confined to the intended interval. Unocal
prefers to perform temperature surveys due to the potential of sticking a plug deep or
having to employ coil to drill out a temporary BP.
Blair reviewed cement quality in September 1988. He notes good bonding above the
perforations. In this data submission, Unocal has presented 4 separate temperature
curves. The temperature curves demonstrate that the injected water is being confined to
the intended zone.
Area Injection Order 5 allows injection into Trading Bay Unit, McArthur River Field. The
BHL of well K-04RD is located in the covered area. The portion of aquifers beneath
Cook Inlet described by a 1/4 mile area beyond and lying directly below the Trading Bay
Unit are exempted for Class II injection activities by 40 CFR 147.102(b)(2)(B) and 20
AAC 25.440(c). Granting Unocal's request will not endanger any fresh water.
I recommend acceptance of the submitted observation information. Unocal should keep
this well to the monthly monitoring report and plan to perform another temperature
survey in November 2004.
Tom Maunder, PE
Sr. Petroleum Engineer
April 24, 2003
M:\UIC File Reviews\030424-TBU K-04RD.doc
JAN. 1. 200:3 4.'OOAM
,,
KING SALMON PLATFORM . NO, 967 P.3
1111~03
~r ~ P~
Report Name
WaterRood Injector Well Status
TBU K-4RD Last 90 Days
(~)
2480 81
2450 81
2'~0 82
2,150 83
240O 82
25OO 85
2460 85
246O 85
246O 86
21:tS0 87
24(!0 87
248O ;97
2480 ~
93
2~70 93
2~00 92
25O0 92
0
0
0
0
0
0
0
0
0
35
0
o
0
0
0
0
0
0
0
0
0
o
0
0
0
0
0
o
0
~G'ANNEII?~ ~AR I 0 2003
h~p://kodia~enchortown.uuoca/.com/da/templa~es/t~bular, azp
1/1/2003
Unocal Corporation (
P.O. Box 196247
Anchorage, AK 99501
Telephone (907) 263-7805
UNOCAL
December 5, 2002
State of Alaska
Alaska Oil and Gas Conservation Commission
333 W 7th Ave # 100
Anchorage, Alaska 99501-3539
Attn: Tom Maunder
Re: McArthur River Field
K-4RD water injector
Request for continuation of variance
Dear Mr. Maunder;
This letter is to request a continuation of the MIT variance for the King Salmon K-4RD water
injector. (Permit # 1730420 AP1 # 50-733-20075-01). This well has tubing / casing
communication and has been injecting with a variance since September 1998.
The recent temperature survey run on 11/17/2002 matches the last survey run on 12/20/2000 in
character showing no cooling anomalies above the packer. The older Hemlock injection zones are
clearly identified as well as the Gzone injection zones perforated on 12/29/1998
K-4RD was shut in on 3/4/1997 due to a failed MIT. In 1998 baseline temperature survey, a
follow up temperature survey and a jug test to 2,500# were used qualify the well for a variance.
The well was placed back in service in September 1998. In October 2000, a follow up
temperature survey validated a continuance of the variance.
In support of this request, I have enclosed the temperature survey comparison plot and a well bore
schematic. If you have any questions regarding this, please contact myself at 263-7807 or Hal
Martin at 263-7675.
Enclosures
Sincerely,
jeffe~ j~l~
t ECEIVED
DEC 24 2002
.~lnehora'g-~ iSsiot~
Waterflood Technician
Cook Inlet Waterflood Management
Aogcc K-4RD Variance Request 20021205.doc jjd
(. STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well:
Alter casing: Repair well: Plugging: Time extension: Stimulate:
Change approved program: Pull tubing: Variance: X Perforate: Other:
2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB)
UNION OIL COMPANY OF CALIFORNIA (UNOCAL) Development: 100' RKB feet
3. Address Exploratory: 7. Unit or Property name
P.O. Box 19-6247 Stratigraphic: Trading Bay Unit
Anchorage, AK 99519-6247 Service: X
4. Location of well at surface 8. Well number
4667' FNL, 130' FEL, Sec. 17, T9N, R13W, SM K-4RD
At top of productive interval 9. Permit number
4429' FNL, 4535' FEL, Sec. 21, T9N, R13W, SM 73-42
At effective depth 10. APl number
4515' FNL, 4561' FEL, Sec. 21, T9N, R13W, SM 50- 733-20075-01
At total depth 11. Field/Pool
4577' FNL, 4580' FEL, Sec. 21, T9N, R13W, SM McArthur River / Tyonek
12. Present well condition summary
Total depth: measured 11,459' feet Plugs (measured) 11,352' MD
true vertical 9,864' feet
Effective depth: measured 11,352' feet Junk (measured) 11,251' MD
true vertical 9,769' feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor
Surface 2,880' ' 13-3/8" 3675 sx Class "G" 2,880' 2,778'
Intermediate 9,952' 9-5/8" 1100 sx Class "G" 9,952' 8,556'
Production 10,605' 7" 550 sx Class "G" 10,605' 9,108'
Liner 1,250' 5" 110 sx Class "G" 11,459' 9,864'
Perforation depth: measured
10,532'-10,560' 10,580'-10,600 10,610'-10,635' 10,655'-10,695' 10,710'-10,755' 10,805'-10,890' 1(j~4~.1.0,965'
true 11,024'-11,055'; 11,071'-11,096'; 11,184'-11,316'vertical '~ ~ C~I ~D~"~ ~" - .
I-IEC £4
Tubing (size, grade, and measured depth) ' ,~
Packers and SSSV (type and measured depth)
Baker F-1 Pkr @ 10,050' MD & Camco TRB SSSV @ 291' MD. '-
13. Attachements Description summary of proposal: Detailed operations program: BOP sketch:
Temperature Survey Pict Well bore schematic
14. Estimated date for commencing operation 15. Status of well classification as:
N/A
16. If proposal well verbally approved: Oil: Gas: Suspended:
Name of approver Date approved Service: X
17. I hereby c_(erflf~/i~e foregoin,~,,tru~d correct to the best of my knowledge.
~, Dolan '
Signed: ~ff~~ V '(~>~ Title: Waterflood Technician Date: 12/05/2002
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness lApproval~No,,.
Plug integrity ~./BOP Test Location clearance ~, ~ ~.~ "~"~ ~.~7{ '
~-.~["-' Mechanical Integrity Test "f.,. Subsequent form required 10- ~0~'~,-~,,~. ~t~!
~Approved by order of the Commissioner ~ ~~~~1.. ~ Commissioner Date //
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
40 50 60 70
King Salmon
K-4RD Temp Survey
1/25/00 MIT Temp Survey
80 90 100 110
120 130 t40 150
2/14/98 Survey after 11 month SI
7/27/98 Survey after 12 hr
~tl/25/00 Survey after 12 hr SI
~11/17/02 Survey after 12 hr SI
11/17/02 Survey after 12 hr SI POH
Pkr @ 10,050' ]
Perforations 12/29/t998 Gzone
G1 to G6 10,532' to 10,940'
Perforations Hemtock
Bt to B4 11,352' to fill
t~Ak -Anchorage\Gl oups\OOE tOOE Fie!d s\Tbu\King\W eIIs\K-04\K~4RDIni\S u rveys/Temperatu re/
Jeff Dolan K 4rd 11 17-02 & 11-25-00 vs 2-14 & %27 98 Surveys xls
12/5/2002 Depth vs Temp
Casin~l: 7", 29#, 10,605 OftKB
88 Casinq: 5" Lin_ ~r~.~8#, N-80, 11,459.0ftKB
_Packer St~i~9 set at ~O, 127.0ftK_B on 5/~6/f977
Permanent Packer 10,050 0 BAKER F-1
Tubing 10,053 02992
3 1/2", 9.2#, N-80, BTC set at lO 050.OftKB on 5/16/1977
291
292
2277
2278
2880
4261
13 3/8", 61#J 55,
2880~KB
9 5/8", 44#/47#,
N-80 9,952ffKB
10,053
!0.605ffKB
5" Liner, 18# N-80,
11,459ftKB
4262
4700
5500
5623
5624
9952
10050
10053
10075
10127
10209
10605
11204
11224
11352
11358
11458
11459
Tubing 39 0 2992
Sssv Valve 291.0 2 750 CAMCO TRB
Tubing 2920 2992
GLM #1 2.277 0 CAMCO KBUG
Tubing 2,2780 2992
GLM #2 4,261 0 CAMCO KBUG
Tubing 4~262 0 2.992
GLM #3 5 623 0 CAMCO KBUG
Tubing 56240 2.992
Other In Hole
Run Date Des Top (flKB
10/1/1982 Tagged Fill 11.3t90
12/111985 Tagged Filt 11.2150
3/30/1987 Tagged Fill 11,260 0
7/8/1989 Clean Out - 2 7" 11.3520
7/19/1989 Tagged Fill - 27" 11.3240
7/19/1989 Tagged Fill-213" 11.3160
9/27/1998 Fill 11.2040
Perforations
Shot
12/29/1998 G1 Main Hole 10,5320 I0,5600 60
12/29/1998
12/29/1998
12/29/1998
12/29/1998
12/29/1998
12/29/1998
G2, Main Hole
G2. Main Hole
G3. Main Hole
G4. Main Hole
GS, Main Hole
G6. Main Hole
HK1, Main Hole
HK2, Main Hole
HK3, Main Hole
HK4, Main Hole
10,5800
10,6100
10,6550
10,7100
10,805 0
10,9400
11,024 0
11,0710
11.1840
I1,232.0
10,6000 60
10,6350 60
10,6950 60
10,7550 60
I0,8900 60
10,9650 60
11.0550 80
11.096 0 40
11r232 0
11,3160 80
113520 11,459.0 10000 3500
MECHANICAL INTEGRITY REPORT
0PER & FIELD
uJ ro/'-'e,'"tr~ WELL NUMBER.
'~ ~_ MD
Casing: 7" ~ 9 Shoe: ,...
Liner: ~"/M~ ~J Shoe: {//q2? MD
Hole Size 'r"-,'~
TVD; DV: MD TVD
TVD; TOP: L~_MD
TVDj Set at /C)~ Igl
Il, ZiZ'
; Perfs ll)O 24- ' to --~
MECHANICAL INTEGRITY - PART ~1
Annulus Press Test: IP
Comments:
; 15 rain ; 30 rain
MECHANICAL INTEGRITY- PART ~2
'. Cement Volumes: Amt. Liner /lO ~ '; Csg_5-J~g~ ; DV .
~"/-,,,le - ,l~"ze, ~ 7'"'J~' 7"--oc ~ II,//o ' . z~.~ ~'~ z~.z .
,r" /e~": ,o8~/~ Cmt,vol to cover perfs
Cement Bond Log (Yes or No) ~e5 .~ In AOGCC File
CBL Evaluation, zone above perfs..(((.~,~,,~,~ ~om~,~t.~
/
Produation Log: Type I Evaluation,
CONCLUSIONS:
Part ~1:
rev. 05/20/87'
C.028
[ STATE OF ALASKA (.
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well:
Alter casing: Repair well: Plugging: Time extension: Stimulate:
Change approved program: Puli tubing: Variance: Perforate: X Other:
2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB)
UNION OIL COMPANY OF CALIFORNIA (UNOCAL) Development: 100' RKB feet
3. Address Exploratory: 7. Unit or Property name
P.O. Box 19-6247 Stratigraphic: Trading Bay Unit
Anchorage, AK 99519-6247 Service: X
4. Location of well at surface 8. Well number
4667' FNL, 130' FEL, Sec. 17, T9N, R13W, SM K-4RD
At top of productive interval 9. Permit number
4429' FNL, 4535' FEL, Sec. 21, T9N, R13W, SM 73-42
At effective depth 10. APl number
4515' FNL, 4561' FEL, Sec. 21, T9N, R13W, SM 50- 733-20075-01
At total depth 11. Field/Pool
4577' FNL, 4580' FEL, Sec. 21, T9N, R13W, SM , McArthur River / Tyonek
12. Present well condition summary
Total depth: true measured vertical 11,459' 9,864' feet feet Plugs(measured) 11,352' MD
Effective depth: measured 11,352' feet Junk (measured) 11,251' MD
true vertical 9,769' feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor
Surface 2,880' 13-3/8" 3675 sx Class "G' 2,880' 2,778'
Intermediate 9,952' 9-5/8" 1100 sx Class "G' 9,952' 8,556'
Production 10,605' 7" 550 sx Class 'G' 10,605' 9,108'
Liner 1,250' 5" 110 sx Class 'G' 11,459' 9,864'
Perforation depth: measured ~'~'~
11,024'- 11,055'; 1,1,071'-11 ,og6'; 11,184'-11,316' ~'~
true vertical
:.,,. ~'i~. L...
Tubing (size, grade, and measured depth)
3-1/2", 9.2 #, N-80, O 10,127' MD ~ ,~ -, , ., , ,..~.,
Packers and SSSV (type and measured depth)
Baker F-1 Pkr ¢~ 10,050' MD & Camco TRB SSSV ~ 291' MD. ~F~C~'~O~'.~,~'~
:1~. Attachements Dasoription summary of prol~eali ...... ,',X ' Detailed operations program: .X ' BOP sketch:... '
1~,. Estimated date for commencing opera{ion ............... 15. Status of well olassification as:
12/28/1998
16. If proposal well verbally approved: .......... Oil: Gas: Suspended:
,
Name of approver Date,,approved Service: X
17. I hereby ce, rJi ~ that the foreggling is true and correct to the beet of my knowledge.
Signed: ~ an Williamson Title: Drilling Manager Date: 12/3/1998
' ' ' I~OR COMMISSION'USE ONLY '
Conditions of approvai: Noiify Commission so reprasenfative n lay witnass IApprovai No.,~ '"
Plug integrity BOP Test z,,/' Location olearance~ _
Mechanical Integrity Test Subsequer~l[ form required 10-
Origina SignerJ
David W =.Johnston
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
,,ELECTRIC LINE PROCEDURE
Well: K-4rd (Injector)
Facility: King Platform
Field: McArthur River Field
Leg: 2
Conductor: 11
API #: 50-733-20075-01
AFE #: 132926
Operation: Perforate
Objective: Perforate Gl, 2, 3, 4, 5 & 6 Formation
UNOCAL
Perforating guns to be used:
Type (Strip or hollow carrier):
Size:
Phasing:
Shots per foot:
Maximum gun length,:
Hollow carrier
2-1/2"
60 deg.
6
30'+/-
Status:
Tubing:
Tubing tail:
Casing:
WH Connection:
Min. ID/Depth:
ETD/Date:
Gauge OD/Date:
RKB:
THF to RKB:
Deviation (Max.):
HaS concentration:
3-1/2", 9.2#, N-80
10,127'
5", 18#, N-80
4-1/2", EUE, 8 md.
2.75" in SSSV @ 291'
To be run
To be run
100'
35'
39°
NA
Special Concerns:
1. All guns will be shot with well shut in.
K-4rd Perf 9-9-98
Ralph P. Holman
12/02/98
Page 1
Contacts:
Name .... .,O, ffiee Home
Chet Starkel 7636 694-7600
Lee Bailey 7818 345-9493
Dan Williamson 7677 248-7558
Ralph Holman 7838 563-6923
(
Cell
229-8821
229-3199
Pager
268-7978
231-0682
I®
He
Hold safety meeting with production, drilling and Schlumberger
personnel.
1. Establish that the tree valves are not leaking.
2. Review UNOCAL Perforating / Explosives Safety Checklist (attached).
.
Establish who will be making announcements re: radios and welding and who will
contact heliport and dock regarding radio silence. (Note: There will be no
helicopter landings during arming of perforating guns.)
.
Ensure that lubricator can be bled off to facility system.
Establish tag out procedure for wellhead valves while wireline is in the well.
6. Spot SCBA's for rig up/rig down operation.
,
Production will issue a hot work permit to Schlumberger for perforating. Establish
that well room is free of gas and H2S.
8~
Establish whom Schlumberger is to contact for pressure test and to operate
wellhead valves.
.
10.
Warn all non-Schlumberger personnel to stay clear of gun loading / arming area.
Note: a pump-in sub with a valve is required below the wireline BOP's..
11.
12.
Open well room exterior' door prior to breaking lubricator.
If well has a SSSV, ensure that it is pumped up to 3000 psi and blocked in the
open position.
Pressure test lubricatoi' With FIW, methanol or diesel depending on the temperature
to 500 PSI for a low. p~ute test and check for leaks. Then, test to 2500 PSI or 500
PSI above shut.in tubitig pi'essure, whichever is greater and check for leaks.
K-4rd Perf 9-9-98
Ralph P. Holman Page 2
12/02/98
(' (
Perforate the following intervals and record information listed on the
"INDIVIDUAL GUN RUN REPORT".
PU gun, CCL and weight bars and RIH with well shut in noting nipples, packer,
etc. on the way in.
2. Log up through EOT and production packer to confirm depth.
3. RIH to TD and tie in with Dresser Atlas CB L dated 8/14/74.
4. RIH and log up into position starting at the lowermost perforated interval.
5.
When Schlumberger and UNOCAL witness have agreed on depth, fire gun. (Note:
watch weight increment indicator for indication that gun fired)
6. Repeat as necessary to complete the following tie-in log depth intervals:
ZONE ............................ TOP BOTTOM FEET
I Ill I
G6 10,940 10,965 25
G5 10,805 10,890 85
G4 10,710 10,760 50
G3 10,655 10,695 40
G2 10,610 10,635 25
G2 10,580 10,600 20
G1 10,532 10,560 28
TOTAL 273
7. POOH, RD
8. Place well on injection, increasing rate slowly over the period of a day.
K4rd Perf 9-9-98
Ralph P. Holman
12/02/98
Page 3
/nee[
/
.,
./
·
~PARTMENT
,IVERSIFIED BUSINESS
.=oUP
K INLET OIL / TBU
UNULAL
."%ULJIUIIL] I' ',,al ,~.,,..AJ,,,,.~IIUILUI'"
Unocal Enet~"7 Resources Division
919198
IUNIT/SUBSIDIARY
IALASKA
ILOCATION
· ITradincj Bay Unit- Kin~l Salmon Pla~orm
Add G-Zone Perforations
K-4RD Injector
King Salmon Platform
McArthur River Field
Reason For Expenditure:
The G-Zone in the main feature of the Trading Bay Unit has historically been under-injected, and as a result, the
reservoir pressure has declined to about 2700 psi. The current injection to withdrawal ratio ( IRV ) is below 0.7
and any I/W under 1.0 leads to a further decline in the reservoir pressure. Therefore, actions need to be taken
to increase the water injection into the G-Zone to help maintain pressure support in this reservoir. The addition
of G-Zone perforations in K-4RD is part of an ongoing expansion of the G-Zone waterfiood.
Well K-4RD is currently a Hemlock injector with the tubing tail set above the G-Zone. It is proposed to add
perforations in the G-Zone to make this well a single G-Zone / Hemlock injector.
Proposed Perforation Intervals:
G-1: 10,532 - 560'
G-2:10,580 - 600'
G-2:10,610 - 635'
G-3:10,855 - 695'
G-4:10,710 - 760'
G-5:10,805 - 890'
G-6:10,940 - 965'
3500 I
4800 ]
5200-
540O
7000 l
7500
8000
8500
9000 ]
10050 Loca~or Seal Assy
0055 F-I Pkr w/15' SBE
~/9 Sa!.mo~ K*4RD
UWi 507332007501 Field Code
_T__D_ i 1459.0 fi:KB
PBTD I i 1352.0 ftKa
Province [
Licensee 8/14~74
License No.
.~tlrf, Rights ]
Class.
100.0 fi 85,0 fi
83.6 fi: 35.0 ft
16.4 ft
3 1/2 in GLM w/
4
11352.0 - i1459~0
11024,0 - 11055.0 2/23/98
11071.0- i1096.0 2/23/98
t1184.0 - 11316,0 i 2/23/98 ] 8.0/
UNOCAL )
P. O. Box 196247
Anchorage, Ak 99519-6247
907-276-7600
907-263-7884 fax
'!3 -oqz
?O-CO "7
October 29, 1998
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn:
Re:
· .
Mr. Blair Wondzell
King Salmon Platform
Well K-4RD APl # 50-133-20075-01
Well K-30RD APl #50-733-20211-00
Report of Coil Tubing Cleanouts
Mr. Wondzell:
This letter is to inform you of recent coil tubing operations on King Salmon K-4RD and
K-30RD.
On 9/16/98, coil tubing was utilized to mill out scale from inside the 4-1/2" production
tubing on K-30RD. Production had declined recently on K-30RD and the suspected
problem was severe scale restriction in the tubing. Scale was milled from 10,000' to
the tubing tail at 10,555'. However, a relatively fast penetration rate of 10-30 ft/min
indicated the scale build-up was not severe. The well has been placed back on gas-
lifted production with no appreciable increase in production.
On 9/22/98, a "Fas-Drill" tubing bridge plug was ddlled out of the tubing tail on K-4RD
injection well. The plug had been set in the tubing tail to allow a pressure test to
demonstrate casing integrity in this well which has known tubing leaks. (An earlier
correspondence dated 9/3/98 documented the pressure test and AOGCC approval was
granted 9/8/98 to resume injection) After the plug was drilled out with coil tubing, the
well was placed on injection.
If there are any questions or you require further information on these two operations,
please contact me at 263-7677 or Tim Billingsley at 263-7659.
',. ' . .' /.j,ti' ' '/~' '
Dan Williamson
Drilling Manager
Unocal Alaska
K-4RD Well File
K-30RD Well File
SEP-03-98 THU 16:28
UNOOAL-AK NEW VENTURES
( Unocal
909 W. 9th Avenue
Anchorage, AK 99501'
907-263-~8~F 76 ~
Fax 907-263-7884
NO, 9072637828
P, O1
faXtransm'itt
tO'
al
fax number;
from:
re:
pages;
NOTES:
~/.,;,~
Nas~ 0il & Gas Co~s, Com~ss~Otl
Anchorage
SEP-03-98 THU 16:28
UNOOAL-AK NEW VENTURES
NO, 9072637828
UNOCAL )
P, O. Box 196247
Anchorage, Ak 99519-6247
P, 02
907-2767600
90%263-7884 fax
. _
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
September 3, 1998
Attn: Mr. Blair Wondzell
Re: King Salmon Well K-4RD
Mr, Wondzell:
This letter is to document the 7" casing integrity test of K-4RD and request permission to continue
irljection into this well.
Well K-4RD has Gornmunication between the tubing and the 7" casing. The tubing leaks were
located by a Kinley caliper survey on 7/1gl98 at 2398' and 4723'. TemperetlJre surveys were run
on 2/14/98 and 7~27~98 and are enclosed. The temperature survey on 2114/98 was run alter
shutting in inje~ion for 12 hours. The well remained shut-in until the temperature survey on
7~27~98. These temperature surveys indicate there is no casing leak above the packer and there
is no cross-flow behind pipe.
A pressure test was completed on 9/2/98 to prove 7" casing integriLy. Flint, a Fas Drill plug was
set in the tubing tail at 10,110' MDI8684' TVD on 8/28/98. Then, the tubing and tubing x 7"
annulus was pressure tested to 2600 psi on 9/2198 from 10:00 am to 2:00 pm with no pressure
leak-off observed. The 7" x 9-518" annulus increased from 300 psi to 520 psi at the start of the
test due to ballooning of the 7" casing. The 7" x 9-5/8" annulus remained at 520 psi during the
remaining 3+ hours ot the test, 'l"lle 9-5/8" x 13-3/8" aTlnulus remairtecI at 50 psi during the test.
The corre~ed 2-pen chart records of this test are attached. Unfortunately, the first chart was not
the correct pressure scale. A correct §000 psi scale chart was found during the test. Chart #2
shows the continuation of the test using the correct chart paper,
In conclusion, K-4RD can be operated safely with no risl( to shallow fresh water aquifers or gas
zones due to casing Integrity. Please grant us permission to continue i~je~i0n into this well under
the assumption that we will monitor the various annuli daily and report this data monthly, and we
will run a t~y eve~ two years for comparison with the base survey which was performed
Ploa4~e sign and send a ~opy ef this letter to our fax at 263-7884 or otherwise call us at the phone
numbers listed b~low with any questions or comments.
Tim ISillingsley ' [/
Unooal Reservoir/Production Engineer, 263-7638 Drilling Engineer, 2'63-7659
Please return a signed and dated copy of this letter to doGument your approval for our records.
I~iair wondzell, ~bcc"'
b]zJ~-U6-~J~J 1HU lID: ~ UFIUUHL-III~ PI~/ vr. pl 1Ul~o r ri^ l~u, ~u i,"uo ,"'co ~,
1,000'
1,500'
2,000'
2,500'
$,000'
3,500'
4,000'
4,500' --
5,000'
5,500'
6,$00'
7,000' --
7,500'
8,000'
8,800'
9,000'
I0,000'
10,500'
11,000'
11,500'
40 50 60 70
0'
Linar
K-4rd Si vs Act Temp Survey,xls
Depth vs Temp
King Salmon
K.4RD Temp Suntey
5 Month vs 12 hr Shut-In
80 90 100 110
120
RECEIVED
Ar~chorage
130
140
t50
g/~/g8
steve Tyler
SEP-03-98 THU 16:31 UNOCAL-RE NEN VENTURES FAX NO, 9072637~828
· -' "' 0~_.:2' ' ' "--- I 1~/
. *
P, 04
iI
SEP-03-98 THU 16:32
UNOOhL-~qK NEW VENTURES
NO. 9072637.,.828
~' "~,d,
P, 05
SE:P-03-98 THU 16:33 UNOCRL-RK NE:Pi VE:NTURE:S' FRX NO, 9072637828
P, 06
ARCO AIm,~a, Inc.
Trading Boy Unit - King Sal~ Platform
Nanger Type.* FMC
Max Hole~e: ~eg · 89'20' A,,K:) ·
Wd T~e: Wat~' Inl~--flon
Cameo 1ltl
fk2ker 'F
Tubing tall
Tubing
P~Gral~ Delhi * DIL depth~
lOt&~ - 11319' ~ Tagged'fill
I~t11~ - ,1121~ BJ~4 Tagged ~'
~0/8,7 - 11flx50' ELM Tag~edtlif
7/08/89 2.7' lla~CTMD ~
7t19/e9 2,7' l1824'SI.M Taggedffi
~- I135~ MD
I'D = 1 ldgY blO
Dalun~ 10~I'MO (9'J~0' ~S. q~Cq3'
:
Unocal
909 W. 9th Avenue.
Anchorage, AK 99501'
907-263-~ '7/0 ~
Fax 907-263-7884
faxt r a n s mit t
al
to:
fax number:
from:
date:
re:
, pages:
NOTES:
~/[ 'd £9LL'ON 'd~O0 'IVOONi'I ~dS~';;[ 866L '[ 'dos
d ~ UiqOCAL WELL SERVICE REP.~qT,
,,.
~ ~ ~:- .~d~ ~e p~ ,;,, ,
~' ~MB .
~ ~ _ 1.5 ,~~~~~~~ ......... ~ ........
,-P~-~
..... ~__~. ~j.~ ..... 2j. .... =,~~..~ ........ · '~ ..... -- .......
[ · " ~ h PHm H.~ T=r Faa ~jll B~ · ~ , '
....... 7' . ~d · ~ 1011~ a
.............. [~m~d~ ~ ~o --
,,. ~m,
.~_ ~;~ , ~ ~ _ m~~M~ ...........................
, 17~ ~1~ ; 4 ~ ~i~F~ ~L~~}~-~~~ .............
~~, q ,~ .... ~ ~$- u~m~'I
,
,.._~,,~ ~
.~,,
es~/... ~ ...... ~ .... ~ ~ ..........
7 x 31~ ......... 2~
~ ,..~.------
..~ ................. I ........... ~ .............................................
, ,
.......... ~ ' r~~m ...................... ~ ...................
,
..... .......................................
,
'M'M'~U~' nm.P-- 'u~'-'~''''~'m~-''~
. .
. P~I d~l~ St,~ ..............
~RS ~rdlne ~wl~ i~6
' .p.~.
.~p.. ~ .
~ ~ml~qlll
,
~ .'
,
,' AFE ~NT: -
~ . ~ ~ - ' ,
~ sERMcE oRm N~
~/~ 'd L9LL'ON 'd~lO0 'lVOONn ~d6~'~L 866L ' L 'dos
ARCO Alaska, Inc.
Tracrmg Bay Unit - King Salmon Pialform
,Spud Datm. 6-14-74
Top of Hem. l~ i I~
gOS2'
C,m'r~etJc~ Dale= 6-16-77'
Hanger Type: FMC
Max Hole Angle. 30 deg · 89'J0' MO
Lad Revered: 12-05-89
We~ Type: Wa~m' Irde~tto~
Ne~ E] Workover I~1
Re<m~n: ~ FI ~
cmmg end t~blng
3-t~' 9,2~ N-eO BTC
4~6]' 2 3895
-_~_~_' 3 ~iO
7" cardng ta 4u~ooe
IO2ag' II48~ LJfler
39' 1O122' Tubing
KBUG dummy
KBLIG dummy
~U~ dummy
zone ~ ~Jnmvd ~ al~
1 1~ 11024'.-11066' 3] a
:2 1DTcve, aao 11oo'1:11o~6, g5 4
,3 111,6&4X~6 111~-11:~2' de .4/8
4 I~ 1~-t1316~,83 8
6 - bek~ PBI'D
c-,auge lung and m Level Dal, a
lq/a~ - 11319' g,k,'t Tagged ~
12/1/86 - .11216' ~ Tagged ell ·
3130/~7 - 1i ~LM Taggeclffll
7/o8/a9 2.7' ~13a~'c'~ldD ~
7/19/89 2.7' 113~'~v( Tagged ~ ,
9/16/89 ~,T3' 113'}~)'1~ ToGged aa
9,,.8
B-.4
8/8 'd L9LL'ON
'd~O0 'IVOONFI IAId6;~'~L 866L ' L 'des
Unocal
909 W. 9th Avenue
Anchorage, AK 99501'
907-263~~ 76 5'q
Fax 907-263-7884
faXtransmittal
tO:
fax number: ,~
[ 3 70/- 75-~/~, ....
, ,
from:
date:
re: ,, , ,.
pages:
I .. ,
NOTES:
SEP oI 1998
' C~;cm~ ~mmi~'lon
g/t 'd 8LtL'ON 'dBO0 'IVOONR ~d[g'[ 866[ [ 'dos
Sent by: K~NLEY CORPORAT[0N
713864 1037;
07/22/98 4:34AM;Jetrax #117;Page ¢
UNOCAL
·
Trading Bay Unit, ~:ing Salmon, AK
K-4RD
' July 19, 1998
Survey No. 27383
·
,. " Chart No.' 21987
. .
, .
This is the first survey of this well to be made with the Kinley Baseline Caliper. The
condition of the inmmal suds. ce of the ~__!12" 9.2# Buttms~s tubing in fie well', from O' to 10:1[,p0'
tWLMI, is covered in this report.. ' '
Complete penetrations are recorded in the lower body of Joint #'s 80 and 157. The hole
recorded in Joint #80 is located approximately 8.2' above the connecti~ betwee~ J~int ~s 80
and 81 at a depth of~' (WLM). The. hole recorded in Joint #157 is located approximately
1.4'.above the connection between Joink,~fs 157 and 158 at a depth of ~ '(WLM). Cross-
secuonai clrawings at the location of the holes and photocopies of the re=or(tings
and 157 are inclue~l in this report.
., The c~ndition 'of the tubing 'surveyed ariel analyzed ranges from good 'to poor with
respect to corrosiv,.~ damage. Indications of co~'rosive damage are recordea in almost all joints
in the forms of t~o holes, general corrosion, and lines of corrosion. As illuslrated' by the
Corrosion Profile, '¢ orro$ive damage Js recorded throughout, the, tubing suN. eyed and analyzed.
" Llgl~t depo;~its are 'mcorde¢l ,throughout the tubing surveyed and' analy~e~. These
deposi~ range from negligible amounts to moderate buildup on the'internal 'surface of the
tubing.
Most of the corrosive damage in the interval between Joint #'s 9' and 240 is widespread
with respect to circ ~mferenfial wall loss. Because of the combination of circumferentia~ wall loss
and deposits, tl~e ~)ominal inner diameter of the tubing is unknown and the penetration values
listed In the Tabulation Sheets may be slightly different from, the actual wall loss. ',
C.~LIPER T£CHNICIAN
'Ken Bullcic. h
/
mab ' ', '
.,
Distributj~n:.
sEP O1 1998'
Alaska 0il & Gas Cons. Commission'.
UNOCAL~/,TTENTION: Mr..St~j~ 907 West 9th Street,'
, Anchorage, AK 99501 (4R)
,
,,
Chart received: 07-21-98 ..
Report faxed: 07-22-98
Report mailed: 07-22-98
.. ,
SURVEY ANALYST
Mark A. Brown
~/~ 'd $£LL'ON
d~O0 IV::)ON~ INdL2'L 866L
'des
JUN-29-98
I ON 13:41
UNOOAI ASSET GAS GRP
FAX NO. 9072637t74
P. 01/O!
Unocal Corporation
909 West 9'~ Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
UNOCAL
June 29, 1998
Wendy Mahan
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Wendy,
Re: Status of Unocal's Cook Inlet Injector Work
This letter is to provide you with an update of the work conducted since our March 27, 1998 letter which you signed
granting time extensions for various wells.
_Testing or work wag completed on the following
~. o~tz. Anna 46-42
':iS'o4z King 4RD
-:i'1.a'5,,t King 15RD
So- s ~ o - Del ly D- ! 6RD
s'l-I~$ Dolly D-22
-~s'-ols Grayling 22
~'~. o~"l Grayling 36DPN
~/t-o:,q Monopod A-12RD2
9z.-o~ Monopod A-29 :
:~4' ?~ Baker 9 :
wells and the results of. this work is listed:
: SI MIT approved on 4/17/98.
: SI MIT approved on 4/17/98, workover scheduled.
: SI MIT approved on 4/17/98. Jug test proved communication, workover scheduled.
: SI MIT approved on 411.7198.
: SI MIT approved on 4/17/98.
: Workover completed on 4/19/98,
: Workover completed on 4/28/98.
: SI MIT approved on 6/03/98.
SI MIT approved on 6/03/98.
SI MIT approved on 6/0:3/98, planning acid treatment to clean tubing for lesting,
King 22RD ' Variance granted on 6/09/98, Jug test proved casing integrity.
Anna 27-42 :Coil Tubtng clean out completed on 6/25/98, furlher testing scheduled to prove casing integrity.
Anna 19-42 :Coil Tubing cleanout completed on 6/27/98, further testing scheduled to prove casing integrity.
Granite Point 33-14RD: Wireline fishing continuing to remove wire and wireline fish from well.
Grayling 5 : Redrill in progress.
_Testing or wo,rk was attempted on the following shut-in wells and. a time extension until September 30, 1998 is
r~ouested to complete further work and testing_ - -
sis -o ~, Anna 19-42' Coil Tubing clean out completed on 6/27/98, further testing scheduled to prove casing integrity.
":1:/.el t, Anna 27-42: Coil Tubing clean out completed on 6/25/98, further testing scheduled to prove casing integrity.
· '4'!- 0"4 Grayling 28: Coil Tubing cleanout plnnned to follow currently active rig program.
~o- o~ Grayling 40: Workover schedule in current rig schedule.
':i~-o4z. King 4RD · SI MIT granted on 4/17/98, workover scheduled.
"4'~- o%'tKing ISRD · SI MIT granted on 4/17/98. Jug test proved communication, workover scheduled.
As you can see we are making excellent progress. Unocal respectfully requests a time-extension until September 30,
1998 to complete the work on the above listed Anna wells. The Grayling and King work will be executed per our
current drilling schedule. Please call mc if you have any questions or clarification on these issues.
Cook Inlet Waterflood Management
Please acknowledge the approval of the time extension and your receipt of Ihis letter by.. f..axiin~ b,nck a siRned cory
of this letter to Christopher Ruff at 263-7874 (fax). ~-~
Wendy-Mahan D tc ' - dUN 2 9 1998
AOGCC ·
Alaska Oil & Gas Cons. Commission
AnchMage
ii
__
il
i i
i ii
PBTD: //.3s',= _
mD'[ //' ME'?' _
~'1t ~ //~'bO' mO(~4g/-'~)3/?°/'~Tp[RFORAriON I~ECOI~O
-(hl ~ //~/~'~m ,z/,/~
OlL-~ . ZONE ~r.
///e~-/~ 3 ~ ~,,,
///e~-//~3~ 3 ~ 8
//~z -//3~ ~
~..l,~ "c~;. . . ..
. ,
I
TOP
PACKER; ~:-)--" ~'-/' ~/005'0_
NIPPLE'
e,
TUBING TAIL: /o/a,F
BOTTOM
PACKER:
NIPPLE:
· TUBING TALL:
BENCH DATA
6/20 - " --"--
I /84 S04i84o02 iqEv. 2
· ALL C)[PTI, I~ AliE. ItKi Id:), RESERVOIR DATUM ' ?~-o,
TUBXNGt .3 '/z." ~.a~ w'-~o ~TC _~ /~/-~7 .
7' ~a?~ ~,,, ~(,./-.-~-(-. _ TOP OF LII~E:R ,K'"
~PR-~O-B8 MON 0@:~8
UNOO~L ~$$ET G~S GRP
(
NO, 90'72637874
(
Unocal Corporation
Agricultural Products
909 West 9'~ Avenue, P.O. Box 19624'/
Anchorage, Alaska 99519-6247
Telephone (90'/) 263-7S30
UNOCALI)
P, 01/01
Apri~lg, 1998
Wendy Mahan
State of Alaska
Alaska 0il and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
Re: Trading Bay Field
KiNG SALMON K-4RD, K-1SRD, K-22RD
Dear Wendy:
This letter is to document your approval to place ICing Salmon K-4RD, K-15RD and K-22RD on injection
for a period of five ($) days, over the next two (2) weeks, to conduct diagnostic analysis.
To verify the WFI, results, we will be nmning a seri~s of temperature logs (before and after injection) and
conducting wellbo~e pressure tests prior to tho commitment of a fig activation to condu~t workover
operations on ~ese injectors.
Please sign and send a copy of fltis letter to my fax at 263-'/$?4 otherwise call me at 263.?830.
Sincerely, .
Christopaer A.-ttuu
Senior ~oir Bn~n~r
Cook Iffi~ Wai~d ~gem~t
Pleas~ return a signed and dated copy of this letter to document no§fication for our records,
~Cndy~ . ~-ate' '
AOGCC
Aogcc King tests.doc
- fi-
SCANNED ~AR
04/20/98
~PR-09-98 THU 10:41
UNOCAL
~SSET G~$ ~RP
F~X NO, 9072637874
Unocal Corporation
Agricultural Products
909 West 9~' Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
Telephone (907) 263-7830
UNOCALe
P. 01/04
April 9, 1998
Wendy Mahan
State of Alaska
Alaska Oil and Gas Conservation
Commission
300! Porcupine Drive
Anchorage, AK 9950!
Re: Trading Bay Field
KING SALMON K-4RD, K-I~RD, K-22RD
Dear Wendy:
This letter is to document your approval of King Salmon K-4ED, K-15RD and K-22RD Shut-In MIT's.
Attached is a copy of the temperature surveys completed in February 1998.
Please review this data. If these wells pass their Shut-In MIT, please sign and send a copy of this letter to
my fax at 263-7874 otherwise call me at 263-7830,
Senior Resm~oir Engineer
Cook Inlet Waterflood Management
Please return a sisned and dated copy of this letter to document notification for our records.
AOGCC
RECEIVED
/~,?~ 09 1998
Naska Oil & Gas Cons. Commission
Anchorage
Aogcc Kixt§ SI MIT.doc
04/09/98
a?R-09-98 THU !0:42 UNOOaL aSSET OaS 6RP FaX NO, 9072637874 P. 02/04
3,000'
3,500' -
4.000' -
4,500'
6,500'
8,000'
10500' -
K*4rd Temp Survey xls
Depth vs Temp
King Salmon
K~4RD Temp Survey 2/14/98
1oo 1 lO 12o
13o !40 150
4/9/98
Steve Tyler
fi?R-09-98 THU i0:46 UNO0fiL aSSET GaS 6RP FaX NO. 9072637874 ?,03/04
King Salmon
K-22 Temp Profile
40 50 60 70 60 90 1 O0 110 120
O'
13O
140
150
1,000'
2,000'
3,000'
4,000'
5,00(7
6,000'
7,000'
9,000'
10,000'
K-22rd Temp Survey,xls ~,,_
Depth vs Temp
4/6/98
Steve Tyler
APR 09-98 THU I0:51
O'
UNOOaL aSSET 6,~S GRP FAX NO, 90,726378'74
King Salmon
K-15RD Temp Survey 1131/98
I30
P, 04/04
140
2,000'
~,000'
4,000'
5,000'
7,000'
8,000'
9,000'
10,000'
11,000'
i 2,000'
12,000'
K-1 5RD Temp Sui~ey,xls
Depth vs Temp
4/7/98
Steve Tyler
I'I~R-27-98 FRI
13'52
UNOCAL
~SSET G~$ GRP
NO, 9072(6~7874
P, 01/01
Unocal Corporation
909 West 9" Avenue, P.O. Box 196247
Anchorage, Alaska 99519-6247
UNOCAL
Mm'ch 27, 1998
Wendy Mehan
Alaska Oil and (}as ConservaQon Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Wendy,
Re: Status of Unocal's Cook Inlet Injector Work
This letter is to provide you with an update of the work conducted since our January 23, 1998 letter which Blair
signed granting time extensions for various wells.
Testing or work was completed on the folio, wing wells ~md the results o£ this work is listed:
Anna. 29-42; Well head inspection completed (no leaks), Variance granted on 3/3/98.
Baker 4: MIT passed on 2/15/98 by Leu Gdmaldi
Bruce 31-42 '. Coil Tubing operation completed to repair leaking cement plug. Pressure test completed.
OP 33-14RD: SI MIT successfully completed on 2/11/98.
GP 22-13RD2: Variance granted on 3/17/98, MIT completed on 12/15/97.
Grayling 16: Workover completed on 3/26/98. MIT Passed,
Monopod A-gRD2: MIT passed on 1/28/98 by Leu Grinmldi
Tcsting or work was attcmp, tcd on thc following shut-in wells ~d a time ex!ensign ,.until l, ne 30, 1998 is reque~e,!
to complete funher work md testing_
Anna 1942: Scale cleanout of tubing completed, further testing scheduled to prove casing integrity.
Anna 27-42: Scale cleanout of tubing completed, further testing scheduled to prove casing integrity.
Anna 4642: Temp Survey ran on 2/17/98, survey should prove no flow and allow SI status.
Baker 9: MIT attempted on 2/15D8, lhnher wireline teeing scheduled to prove casing integrity.
Monopod A-12RD2: SI MIT attempted, Temp Survey scheduled to prove no flow.
Monopod A-29 : SI MIT scheduled to prove no flow/casing integrity
- Kin§ 4RD : ~ indicates possible casing leak, well shutin, furthcr testing and workovcr scheduled.
King 15RD: ~ indicates possible casing leak, well shutin, further testing scheduled.
King 22RD: WFL indicates possible casing leak, well shutin, further testing scheduled.
Grayling 5 : Workover/Redrill scheduled in current drilling schedule.
Grayling 22 : Workover/Redrill scheduled in ~t drilling schedule.
Grayling 28 : Workovcr/Redrill scheduled in current drilling schedule.
Grayling 36DPN : Workover/Redfin scheduled in current ~edule.
Grayling 40 : Workover/Redrin scheduled in current drilling schedule.
Unocal respectfully requests a time-extension until June 30, 1998 to complete the work on the above listed Anna,
Baker and Monopod wells. The Grayling and King work will be executed per our current drilling schedulc.]~lessc
call me if you have any questions or clarification on these issues. R E C ~ i V ~ ~)
· . ·
Anchorage
Please acknowledge the al~oval of the time extension and your receipt of this iett=~ by faxi~ back a .~igned copl
of this letter to Chlistopher Ru_ff at 263-7874 (tax).
x;Vcndy~it:han Dat~ 'l - -
AOGCC
J~N-14-98 ~ED
09:19
UNOCAL aSSET GaS GRP
..
F~× ~0.
9072637R74
P. 02/02
UNOCAL
909 W. 9"' Ave.
Anchorage, Alaska
Blair Wondzell
State of Alaska
Alaska Oil and Gas Conservation 'Commission
G'2Z
K-((
Re.' McArthur River Field Injectors G-22, K-4RD,
K-15RD, K-22RD, K-7RD & K-11
Dear Blair:
As per our phone conversation on 1/13/1998.
The WFL ran on Grayling Platform G-22 showed a breach in the 9-5/8" csg between 4750' and
4800'. The WFL indicated water flowing down the 13-3/8" X 9-5/8" annulus from the breach in the
9-5~8" csg out thru the 13-3/8" shoe..The well is currently shut-in and will remain so until it can be
repaired. I will be forwarding G-22's WFL logs and summary to you when we receive them in their
final version from Schlumberger.
King Salmon K-4RD failed it's MIT on 2/26/97. The well was shut-in on 3/04/97. Slickline attempts
on 4/5/97 failed to ob~t'~ We plan to run a temperature survey this month and a WFL next
month to confirm wellbore integrity. ,
King Salmon K-15RD, passed it's MIT on 2/26/97. On 11/25/97 th_e csg. p_~ssured ~.p..tg.28._0..0.. psi
(tbg 3000 psi) indicating communication between the t~.~ wel['~h-{--{l~'~_t-.in on_ .....
1_.2.1__0_3/9___7.,.We plan to run a temperature survey this month and a WFL next month to confirm
wellbore integrity.
King Salmon K-22RD, passed it's MIT on 2/25/97. On l~sured u.p_!o_l_8_0_O. PS.i.
(tbg 3000 psi) indicating communication between the tbg-hn-dcSg. The Well was sh[Jt-in on
'T2~33/97;'We plan to run a temperature survey this month and a WFL next month to confirm
wellbore integrity,
King Salmon K-7RD, passed it's MIT on 2/26/97. The well was shut-in on 12/03/97 pending
facility upgrades to the water flood system's ability to handle the Iow injection rates caused by K-
4RD, K-15RD & K-22RD being shut-in.
King Salmon K-11, passed it's MIT on 2/26/97. The well was shut-in on 12/03/97 pending facility
upgrades to the water flood system's ability to handle the Iow injection rates caused by K-4RD. K-
15RD & K-22RD being shut-in.
If you require anything else regarding.what we discussed, please let me know.
Engineering Technician
CC: Chris Ruff
JAN l.:i. 1998
STATE OF ALASKA t'
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Type of Request: Operation Shutdown Stimulate Plugging Perforate m
Pull tubing Alter casing Repair well Pull tubing Other X MIT(Waiver)
2. Name of Operator
UNOCAL Corporation
(ARCO Alaska. Inc. is sub-operator)
3. Address
P. O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
613' N & 130' W from SE Comer, Sec. 17, T9N, R13W, SM
At top of productive interval
851' N & 4535' W from SE Corner, Sec. 21, TgN, R13W, SM
At effective depth
765' N & 4561' W from SE Comer, Sec. 21, T9N, R13W, SM
At total depth
703' N & 4580' W from SE Corner~ Sec. 21 ~ T9N~ R13W~ SM
12. Present well condition summary
Total Depth: measured 11459' feet
true vertical 9864' feet
5. Type of Well:
Development
Exploratory
Stratigraphic.
Service
6. Datum elevation (DF or KB)
Plugs (measured)
RKB 1
7. Unit or Property name
Trading Bay Unit
8. Well number
K-4RD
9. Permit n_umber/approval number
10. APl number
5o-133-20075-01
11. Field/Pool McArthur River
McArthur River (Hemlock)
11352' MD feet
13.
Effective depth: measured 11352' feet
true vertical 9769' feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Junk (measured)
1121 5' MD feet
Length Size Cemented Measured depth
2880' 13-3/8" 3675 sx Class G 2880'
9952' 9 5/8" 1100 sx Qass G 9952'
10605' 7" 550 sx Qass G 10605'
1250' 5" 110 sx Qass G 11459'
measured
11024'- 11055', 11071'- 11096', 11184'- 11315' MD
true vertical
9479' - 9507', 9521' - 9543', 9621' - 9737' TVD
Tubing (size, grade, and measured depth)
3-1/2", 9,2#/ft,N-80 BTC @ 10127'
Packers and SSSV (type and measured depth)
Baker F-1 packer @ 10050' MD~ Camco TRB SSSV @ 29'1' MD
Stimulation or cement squeeze summary
Intervals treated (measured)
N/A
Treatment description including volumes used and final pressure
True vertical depth
2778'
8556'
9108'
9864'
RECEIVED
Alaska 0ii & Cias C0r~s. C0[t~rilissi0,~
Anch0raga.
14.
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run,
Daily Report of Well Operations X
Representative Daily Averaae Production or Iniection Dat:
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
0 0 7649 2000
Tubing Pressure
0 0 7660 2700
16. Status of well classification as:
2700
Oil Gas Suspended
2700
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
FOiT[i 10-40~ev 0~ 5/88 -- ~) -- -~ ' '
Service X
Date '-//Z "'t I.~ '"'4....
SUBMIT IN DUPLICATE
ARCO Alaska, In¢
Internal Correspondence
Date: July 16, 1992
Ftc Code: K-4rd (W5-1)
Subject:
Verbal Approval for Continued Operation of K-4RD
From/L(x:ation: J.T. Zernell
ATO- 1366
To/Location:
Memo to File
This memo serves to document that on July 14, 1992 a verbal approval
for continued injection in K-4rd on the King Salmon Platform has been
received by Mr. Blair Wondzell of the AOGCC.
K-4rd is a water injector on the King S~lmon Platform that because of
known tubing-to-casing communication had been operated under a
waiver from the AOGCC since 1987. The leak is a one-way phenomenon
such that fluid can pass from the tubing to the production casing;
however, when the production casing is pressured tested it does in fact
hold pressure and does not bleed off into the tubing.
Attempts to locate the leak using E-line surveys have been unsuccessful'
due most likely to the fact that the magnitude of the leak is very small
when compared to the total amount of fluid injected. At the beginning of
the year it was decided that the preferred way to operate the well with the
known leak was to allow the 7" production casing x production tubing
annulus to pressure up rather than attempt to keep the pressure off of
the well by bleeding fluid (Filtered Inlet Water) off of the production
casing. This was determined to be prudent operation since there is also
a 9-5/8" x 7" casing annulus which affords adequate protection to any
shallow acquifers above the zone of injection. (Note: All of the acquifers
in the Trading Bay Unit have been exempted by the EPA.) Furthermore,
ARCO had gone to the extent of performing an 'unofficial Ml'ff on the
outside annulus to verify that there was good integrity.
On April 16, 1992 the well failed to pass a routine MIT due to the same
one-way tubing x production casing communication. During the State
Witnessed test the on-site inspector f_~_iled the well because of the known
tubing-to-production casing communication, even though the casing did
actually hold test pressure within 10% as stipulated in the Area Injection
Order. In light of the declared failure of the recent MIT I contacted Mr.
Wondzell to determine what the State's position was concerning the
continued operation of the well in its current condition. After discussing
that: 1) the 7" production casing x tubing annulus does in fact pass the
standard MIT pressure test, 2) the 9-5/8" x 7" annulus offers an
additional level of safety against injected fluids leaving the coif ~,,,~
wellbore above the intended zone of injection, and 3) ARCO had recently
successfully tested this annulus to verify its integrity, Mr. Wondzell
granted ARCO permission for continued operation of the well on injection
in its current condition.
From an operations stand point we must continue to monitor the 9-5/8"
x 7" pressure as if it were the production casing annulus. Plus in the
future, any Mechanical Integrity Testing performed on the well should
include a test of the 9-5/8" x 7" annulus.
Sr. Ope/~ffis Engineer
JTZ:jlg:0044
cc: Mr. Blair Wondzell AOGCC
ARCO Alaska, Inc
~ul~i~li~'y of Atlantic PJcl'lflel~
',,ITRACTOR
!FIELD- DISTRICT,- STATE
WELL SERVICE REPORT
IOPERATI~ AT REPORT TIME
REMARKS
.r-'l CHECK THIS BLOCK IF SUMMARY CONTINUED ON BAOK
D
"tJ
')
-
IJ)
.
to
'-.'
-
1)1
..
1\1
-J
"
;U
r;
..".
-
-
.-
-
Z
~
'.11
D
r
3
.-
-'
~
-
u
r
I>
-i
T1
~
'-1
-n
-
--
-i
,",
-
If¡
~
])
Z
to
.-.
-
.,
-
:u
-
-
,
-
m
"1J
,
.
,
i,-~t
\
,
ON
Ftehl
I
AlASKA Oil AND CAS CON. JATlIIN tMUSS
MECtWflCAl INTEGRITY TEST
()
6)
"
f\I
6)
,
0.
)
j
,
¡
)
f
11
I'
~
!..o'
m
.
a
(S)
'"
.
,
IS)
o
"
c
DfJ.L14
-
-
.'
AOCCC .I1NESS SICNATURE
COt1PAAY R£P S ICNAlœE
CRADfENT:
20 AAC 25.030(6)
10 AAC 2S.~12(cJ
2r. ~^~ 1~.2~:(d}
- .
fØt:1 1=kes5 ug.;E DlZOP 15 j)U¿:' itJ
/NJ{3C.T/Cf-J .c.:.fluí oFr L>uï2/1·/C,.·"'1 í¿~r
.
tJor€l ¿)
,
ANNUlAR fWIDt
-
DrESEL
ayeCl
SAlT WATER
DIU lllNC HUD
01HEa
OTHER
,,'~.,o
*rUBJNC INJECTION flUID:
I ...
P ,. PlWOOCE lirA T Eft INJ
S - SALT WATER INJ
H - MISCIBLE rHJECTIOH
I ,. 1MCT ING
N ,. N01 INJECtiNG
.
L.V';
~(
Ç)fZ¿Foi~\-\ At.) tJ~ L..u;S í&Sí"
~ A...1t-,U"t,yo) ~ Ñ01 t\NN
To
ree,
NJEC.110N WA) 5H\.(T-11-!
()+-t \ CA1'~Ñ 6fHq€~~J
!
K-4RO
T"ERE. \ ~
__ - .... (] 1'-
/1
NO rG{
: .¡;.~
.
D.E'i$.06
r.,. tn,/1
0)
Q
..
(D
Q
f\I
m
m
~,
I
I"-
~,
I
'(f
Q
---- f¡ hi L:I..r' *'
PRETEST START 15 H1N )0 H ItI
.. ... ..-
.p *t TYPE Of PKR CAS INC. t9C REQ Tøc TIME TlHE TIHE
.
WEtL ~S - AtlHUUJS IVÐ SIZE/W1/CRADE SIZE lEST CSC 18& Jee lBC START IIHE I COHH£MnS
t~AHE ... *", fWIO MD . PRESS PRESS CSC CSC CSG
H'-11!Pttl 5~ " .JS.' PRr~ PlESS PRESS
K - 4-PP P '1" 1.100 1500 13~O...J tþ2 I'
ð0 ,.U: fJ{)e;n 7:" 'Zt.!-! tJ - :?>
~
k-1R p r I' .LJì,A;OI _ ¥z ~O t:::{OO (JO .'
~ 2 7 ~ ¿¡:¡ jIJ - "1%.....1.
2- 00 _ £:100 00 :ll1S .' .
1(- IJ ~ P [ II ~. Iß= "1 PI';t I."
2. Z..£ '%'2. ~ ~ It ~ ~ rf:6 <. 6 f'.loT& z.'
L~ I~ .'
k-Z2]t P .!
.
-
"'0!i¡;
#"'^
'''_A' .
f"') .
"''''''',-
('p',
""'¿O
t;'
þ0,,"
;;~~7 -
.-..- Z'
~_>A·.
t:~ .. .
. - .
. 0...:;;0
¿jiiáfit·· .
~i~; I... , if
Ft'%W
". . ~ .
.~~~ ;~¡ .. .. %
,,¡W&~
,
',;; K;; ';.Q. -
~ ,.^
~
r····, . --.-
¡';; v< ''A,%'ÞHKW
if -".
. .. I
.I,! Ii;
~ .¡
"."^ .,,,",-,;;;,.
",,,.".~
an)'
c
'z
4/1
z
o
....
I-
U
::J
o
o
¡r
0.
¡r
UJ
:>
....
¡r
z
o
(J)
Z
<I
:3
(J)
Q
t<l
Q
.,..,
t<l
0)
f\I
I"-
6)
m
I
I
-
ARca Alaska, Inco
Trading Bay Unit - King Salmon Platform
APt#: 133-2007&{)1
$p.Jd Dote: 6-1~74 Con1::>Ieflon Date: 5-16-77
Original RI<B: 100' MD Hanger Type: FMC
Top of Hemlock: 11023 Max Hole Angle: 39 deg @ 8920' MD
Annulus FlIId: Sea water Last Revised: 12-05-89
All Depths are RKB MD to Top of equipment.
Well Type: Water Injection
New n Work over I!J
RKB tõf.janger: 35'
Angle at Perforations: 280
Reason: New Fill Depth
1
1 2
3
Jewelry
291'
lo::ar
10127'
Cameo IRB 10=2.75"
Baker of -1°
Tubing tail
Casing and Tubing
~ ~~ Jhœgg I2Il ~
~ ill & ~ 2800: ~
'-5/8° mm tH1Q ~ mz ~
1:..2.2! ~ ~
2880' i:.1H ti:§g lQD: .1.l§2: .L1n§!
HL.2.: 2.U ti:§g ~ ~ lm2Z: IYb1ng
Gas Utt Intonnation
~~rlQ
Zl7i 1 2'2iO
4261' 2 ~
5623' 3 sno
.MandœI J2IL
KBUG dummy
KBUG dummy
KBUG dummy
9952' Perforation Data - OIL depths Gauge Ring and Fill level Data
~ fIm ~ ~ Jmrtb I
1 11023/9380 11024'-11055' 31 8 10/82 - 11319' ELM Tagged fill
2 11070/9420 11071'-l1o:ì6' 25 4 1211/85 - 11215' ELM Tagged fill
3 11166195œ 11184'-11232' 48 4/8 3/30/87 - 11260' SlM Tagged fill
4 11225/Wf,7 11232'-11316' 83 8 7/08/89 2.7° 11352' CT MD Clean-out
2 5 1135519674 no perfs 7119/89 2.7" 11324' SlM Tagged fill
5'° liner 3 9116/89 2.13° 11316' OIL Tagged fill
6 - below PBTD
10209'
P8lD == 11352' MD
TD == 11459' MD
1'"('. IV"",.
~< ' .j "", ,:c-
.lli..', __ " A \{ :-'Mi> ^, .:~
~, I'" It;.~ Æ Æf
m . .. I"~' " II
'iA '.";'1; 'fib_' 1if ;' §.,.:
.". !G.w', ,w
-~"" (. vi
'tþ'"
¡ "
" .,
, J
¡u¡ ;;
,. .,
-, ..,
e j
',h..,·
B- 1
B-2
B-3
B-4
J t ;
,Ii' X
"i" f
"-, , \,,·ß
-,,{
/- *l
,{ r\\
j '" ,J'
.. li
!;;w,
Datun: 10991' MD (9350' SS. 9450' TVD)
AI' ,
,"'+'''''''1.
,ø"t R4.~~¡(;g r¡;'I~ i n /\
""O',,' ~ "ff"~' ¡e' ,,",
"' ',H "," ",,)'./
" "',(.¡
"'"
r ..
" ,".,
~ Ii,
'^ i'ii "
; Ii
, "
PinH.."
'p '..¡
".,,,,);,,
Unocal North Amer;
Oil & Gas Division ,
Unoc.~t Corcoratlon
P.O, ~ox 1902,,7
Anchorage. Al~a 99519-02~7
Teie~none tg0~ 276-7600
AtasKa Re(j~an
April 16, 1990
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
A~chorage, AK 99504
Attn: Ms. Elaine Johnson
Dear Ms. Johnson:
I have attached surface survey locations of the "Legs" and
conductors for the four platforms in the Trading Bay Unit as well as
the Union Oil-operated Monopod and Granite Point Platforms. I was
unable to locate any plats from a registered surveyor but I hope
this will meet your needs.
Yours very truly,
ar .s.[3 us
Regional Drilling Manager
GSB/lew
CONDUCTOR
LEG al:
LEG #2:
9
lO
ll
12
13
14
15
16
LEG ~3'
17
18
19
20
21
22
23
24
Leg #4'
25
26
27
28
29
30
31
32
KING SALMON PLATFORM FROM SE CORNER SEC. 17, TgN, R13W
"Y" COOR. "X" COOR. WELL ~,' FNL
.
2,511,762 213,819 K-21 & RD 688
2,511,761 213,815 K-30 687
2,511,764 213,811 K-18 690
2,511,768 213,810 K-17 694
2,511,772 . 213,812 K-23 (23-19) 698
2,511,773 213,817 K-19 . 699
2,511,770 213,821 K-22 & RD 696
2,51 l, 766 213,822 K-20 692
2,511,690 213,768
2,511,686 213,772 K-15 & RD 611
2,51 l, 684 213,768 K-9 610
2,511,687 213,763 K-4 & RD 613
2,511,691 213,762 K-11 617
2,511,695 213,765 K-13 & RD 621
2,511,696 213,769 K-2 & RD 622
2,511,694 213,776 K-7 & RD 619
2,51 l, 689 213,774 K-5 615
2,511,723 213,712
2,511,721 213,708
2,511,724 213,703
2,511,728 213,702
2,511,732 213,705
2,511,733 ' 213,709
2,511,731 213,713
2,511,726 213,714
2,511,799 213,760
2,511,798 213,756
2,511,801 213,752
2,511,805 213,751
2,511,B09 213,753
2,511,810 213,758
2,511,B07 213,762
2,511,B03 213,763
K-8
K-1 & RD
K-10 &'RD
K-16
K-12 & RD
K-6 & 24
K-3 & RD
725
724
727
731
735
736
729
FWL
74
78
82
83
81
76
72
71
121
126
130
131
128
124
120
1!9
133
135
141
142
140
135
130
,,
- ' " A~( STATE OF ALASKA !"
,,AOILANDGASCONSERVATIONCOMIV~' .~N~ D ! r ~ ~.:, r ~ ..~..
REPORT OF SUNDRY WELL OPERATIONS" oct
1. Operations performed: Operation shutdown __ Stimulate__ Plugging m Perforate ~
Pull tubing __ Alter ca~ing .__ Rel~r well__ Pull tubing __ Other xC.:. ]W. LocKWOOI ,~
2. NameofOperator
UNOCAL (ARCO Alaska is sub-operator)
3. Address
P. 0. Box 190247 Anchorage, AK 99519
4.
t 5. Type of Well: 6. Datum elevation (DF or KB)
Development ~ 100 ' KB feet
Exploratory m
Stratigraphic ~ 7. Unit or Property name
Service ~ Trad ing Bay Un ii'
8. Well number
K-4RD ( 14-21 )
9. Permit number/approval number
10. APl number
50-- 133-200-75-01
'11. Field/Pool
Hem Iock
Location of well at surface
613 N & 130rw fr. SE corner, Sec. 17, 9N,
At top of productive interval
851'N & 4535'W fr. SE corner, Sec. 21, 9N,
At effective depth
765'N & 4561'W fr. SE corner, Sec. 21, 9N,
At total depth
703'N & 4580'W fr. SE corner, Sec. 21, 9N,
12. Present well condition summary
Total depth: measured
true vertical
Effective depth : measured 11 352 feet
true vertical ' feet
9,769
Casing Length Size
13W, SM
13W, SM
13W, SM
13W, SM
11,459 feet Plugs(measured) 11,352' MD
9,864 feet
Junk (measured)
11,215' MD
Cemented Measured depth True vertical depth
Sudace 2,880' 13-3/8" 3675 sx c I ass G 2,880' 2,778'
Intermediate 9,952' 9-5/8" 1100 sx class G 9,952' 8,556'
Production 10,605' 7" 550 sx 10,605' 9,108'
Liner 1,250' 5" 110 sx class G 11,459' 9,864'
Perforation depth: measured
11,024-11,055'~ 11,071-11,096'~ 11,184-11,315' MD
true vertical .
9,479-9,507'~ 9,521-9,543'~ 9,621-9,737' TVD
Tubing (size, grade, and measured depth)
3-1/2", 9.2~, N-80 BTC 0 10,127' ND
Packers and SSSV (type and measured depth)
Baker F-1 )acker 0 10,050', Camco TRB SSSV e 291' MD
13. Stimulation or cement squeeze summary
RECEIVED
OCT 1 9'1989
Nasla.0il & Gas Cons.
~ ....... = ~ ~
Intervalstreated(measured) Cleaned out fill to PBTD with col led tubing.
11,215-11,352' MD.
Treatment description including volumes used and final pressure
14.
Prior to well operation ( 7 / 6 / 89 )
Subsequent to operation (7/11/89
15. Attachments
Copies of Logs and Surveys run m
Daily Report of Well Operations ~
Representative Daily Average Production or InJection Dat~,
OiI-Bbl Gas-Md Water-Bbl . Casing Pressure
17, I hereby ce~ti~-y that the foregoing is true and correct to the best of my knowledge,
JSigned~~~~ %~--~ r~e Environmental
Form10-404 ~ev 06/15/88 Roy D. Roberts
8080 (9-5/8)
8042 (9-5/8)
J16. Slatusofwellda~ificationas:
~1__ Gas__ Suspended
580
640
Service
~bingPressure
2560
2775
Engineer
Date 10/16/89
SUBMIT IN DUPLICATE
.f
WELL TBU K-4RD
COILED TUBING FILL CLEAN-OUT
REPORT OF WELL OPERATIONS
OBJECTIVE
Clean-out fill covering lower Bench 3 and Bench 4 to increase injection rate into lower zones and
increase production from offset producers.
PROCEDURE
1. RU coiled tubing unit (CTU), riser, BOPE, and pumping equipment on K-4RD.
2. Pressure tested all equipment to 4500 psi.
3. Ran in hole with coiled tubing and circulated out fill to PBTD at 11352' MD. Used drill
motor and 2.70" mill for hard fill.
4. RD equipment and returned well to injection.
A ! STATE OF ALASKA
OIL AND GAS CONSERVATION COMMIS~'~ ~'~~
REP OF SUNDRY WELL OPEt. TIONS'""
1. Operations performed: Operation shutdown __ Stirnulate~ Plugging__
Pull tubing ~ Alter casing ~ Repair well ~
2. Name of Operator
UNOCAL (ARCO Alaska is sub-operator)
3. Address
P. O. Box 190247 Anchorage, AK 99519
Pedorate ~
Pull tubing __
5. Type of Well:
Development
Exploratory
Stratigraphic
Sen/ice
4. Location of well at sudace
613 N & 130'W fr. SE corner, Sec. 17, 9N,
At top of productive interval
851'N & 4535'W fr. SE corner, Sec. 21, 9N,
At effective depth
765'N & 4561'W fr. SE corner, Sec. 21, 9N,
At total depth
703'N & 4580'W fr. SE corner, Sec. 21, 9N,
13W, SM
13W, SM
13W, SM
13W, SM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Surface 2,880 '
Intermediate 9,952 '
Production 10,605 '
Liner 1,250'
Perforation depth:measured
11,024-11,055';
true vertical
Other __
6. Datum elevation (DF or KB)
100' KB
7. Unit or Property name
Trading Bay Unit
8. Well number
K-4RD ( 14-21 )
9. Permit number/approval number
/9-797
10. APl number
50-- 133-200-75-01
'1'1. Field/Pool
Hem lock
11,459 feet Plugs(measured) 11,352' MD
9,864 feet
11 352 feet Junk(measured) 11 215' MD
' feet '
9,769
Size Cemented Measured depth
13-3/8" 3675 sx class G 2,880'
9-5/8" 1100 sx class G 9,952'
7" 550 sx 10,605'
5" 110 sx class G 11,459'
11,071-11,096'; 11,184-11,315' MD
9,479-9,507'; 9,521-9,543'; 9,621-9,737' TVD
Tubing (size, grade, and measured depth)
3-1/2", 9,2~, N-80 BTC e 10,127' MD
Packers and SSSV (type and measured depth)
Baker F-1 packer e 10,050', Camco TRB SSSV e 291' MD
13. Stimulation or cement squeeze summary
True vertical depth
2,778'
8,556'
9,108'
9,864'
Intervals treated (measured)
14.
Treatment description including volumes used and final pressure
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
Prior to well operation (9/6/89 7702 (9-5/8) 710
Tubing Pressure
2500
Subsequent to operation (9/21/89
15. Attachments 116.
Copies of Logs and Surveys run ..~
!
Daily Report of Well Operations ~ Oil __ Gas m
1Z I hereby certify that the foregoing is true and correct to the best of my kn,owledge~
7826 (9-5/8)
Status of well classification as:
280
2540
Suspended __ Service
Date
SUBMIT IN DUPLICATE
WELL TBU K-4RD
RE-PERFORATION
REPORT OF WELL OPERATION
Procedure:
1. Conducted a safety meeting.
2. Rig-up E-line unit.
3. Re-perforated the following intervals under draw-down conditions:
Run No Bench Interval (CBL-MD~ In,erval(DIL-MD) Length
1 4 11294-11314' 11296-11316' 20'
2 4 11252-11272' 11254-11274' 20'
3 4 11232-11252' 11234-11254' 20'
SPF
NOTE: Lubricator was pressure tested to 2500 psig prior to well operation.
4. Rig-down E-line unit and lubricator.
5. Returned well to injection.
0
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon - Suspend - Operation Shutdown Z Re-enter suspended well '--. Alter casing _3
Time extension- Change approved program *- Plugging ~ Stimulate- Pull tubing- Amend order- Perforate X Other"-'
2. Name of Operator
UNOCAL (ARCO Alaska, Inc. is sub-operator)
3. Address
P.O. Box 190247, AnchoraAe, AK 99519
4. Location of well at surface King Salmon Platform, Leg 2, Cond. 11
5. Datum elevation (DF or KB)
100' KB
6. Unit or Property name
Trading Bay Unit
7. Well number
feet
613'N & 130'W from SE Corner, Sec. 17-9N-13W-SM
At top of productive interval
851' N & 4535'W from SE Corner, Sec. 21-9N-13W-SM
At effective depth
765'N & 4561'W from SE Corner, Sec. 21-9N-13W-SM
At total depth
703'N & 4580'W from SE Corner, Sec. 21-gN-13W-SM
K-4m) (14-21)
8. Permit number
9. APl number
50-- 133-200-75-01
10. Pool
Hemlock
11. Present well condition summary
Total depth: measured
true vertical
11,459 feet
9,864 feet
Plugs (measured)
11,352' MD
Effective depth: measured 11,352 feet
true vertical 9,769 feet
Casing Length Size
Structural
Conductor
Surface 2880' 13-3/8"
Intermediate 9952' 9-5/8"
Production 10605 ' 7"
Liner 1250' 5"
Perforation depth: measured
Junk (measured) 11,215' MD
Cemented Measured depth True Vertical depth
3675 sx Class G 2880'
1100 sx Class G 9952'
550 sx 10605'
110 sx Class G 11459'
11024-11055'; 11071-11096'; 11184-11315' MD
true vertical
9479-9507'; 9521-9543'; 9621-9737' TVD
Tubing(size. grade and measured depth)
3½", 9.2#, N-80 BTC @ 10127' MD
Packers and SSSV(type and measumd depth)
Baker F-1 packer ~ 100~0' MD, Camco TRB SSSV ~ 291' MD.
12.Attachments
2778'
8556'
9108'
9864'
RECEIVED
SEP o 7 t98.9
Alaska Ol! & Gas Cons. Commission
Anchorage
Description summary of proposal .~ Detailed operations program ~ BOP sketch
13. Estimated date for commencing operation
June, 1989
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~~?_~. ~/~ Title Environm.e.ntal Engineer
Roy D. Roberts Commission use Only
Date 9/7/89
Conditions of approval
Notify commission so representative may witness
[] Plug integrity - BOP Test ~ Location clearance
ORIGINAL SIGNED BY
LONNIE C. SMITH
I Approval
-<~._.~ ...... q- ~/. ..... l,> .... /~,-~ ~-
Approved by Commissioner
~orm 10-40:~ Rev 12.1-85 '
No.
by order of
the
Approved Copy
Returned
,
;mn Date
Submit in tri Hicate
WELL TBU K-4RD
RE-PERFORATION
Increase well injecfivity. The tool string will consist of perforating guns, CCL and adequate weight
bars.
Current Status:
K-4RD is currently injecting approximately 8000 BWPD.
1. Conduct a safety meeting.
2. Rig-up E-line unit.
3. Re-perforate the following intervals under draw-down conditions:
.Bench Interval (CBL-MD) Interval (DIL-MD)
Length SPF
1 4 11314-11334' 11316-11336' 20' 6
2 4 11294-11314' 11296-11316' 20' 6
3 4 11252-11272' 11254-11274' 20' 6
4 4 11232-11252' 11234-11254' 20' 6
,
NOTE: Lubricator will be pressure tested to 2500 psig prior to well operation.
Rig-down E-line unit and lubricator.
Return well to injection.
E-Line BOPE's
Grease Head/
Hydraulic Packoff
Lubricator Extension
L
Manual Rams
Swab Valve
Double Master
Valves
Wellhead
DML 7/22/88
f"' STATE OF ALASKA ,',.
ALASK[ ,L AND GAS CONSERVATION COMM " JN 0 R
APPLICATION FOR SUNDRY API"ROVALS
1. Type of Request: Abandon ~ Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension ~ Change approved program [] Plugging [] Stimulate [] Pull tubing ~ Amend order_ Perforate ~ Other~
2. Name of Operator
UNOCAL (ARCO Alaska, Inc. is sub-operator)
3. Address
P.O. Box 190247~ Anchorage, AK 99519
4. Location of well at surface King Salmon Platform, Leg 2, Cond. 11.
613'N & 130'W from SE Corner, Sec. 17-gN-13W-SM
At top of productive interval
851' N & 4535'W from SE Corner, Sec. 21-9N-13W-SM
At effective depth
765'N & 4561'W from SE Corner, Sec. 21-9N-13W-SM
At total depth
703'N & 4580'W from SE Corner, Sec. 21-9N-13W-SM
5. Datum elevation (DF or KB)
100' ~
6. Unit or Property name
Trading Bay Unit
7. Well number
K-4RD (14-21)
8. Permit number
73-42
9. APl number
50--3.33-200-75-01
10. Pool
Hemlock
feet
11. Present well condition summary
Total depth: measured
true vertical
11,459 feet Plugs (measured)
9,864 feet
11,352' MD
Effective depth: measured 11,352 feet
true vertical 9,769 feet
Casing Length Size
Structural
Conductor
Surface 2880' 13-3/8"
Intermediate 9952' 9-5/8"
Production 10605 ' 7"
Liner 1250' 5"
Perforation depth: measured
Junk (measured) 11,215' MD
Cemented Measured depth True Vertical depth
3675 ex'Class G 2880'
1100 sx Class G 9952'
550 sx 10605'
110 sx Class G 11459''
11024-11055"; 11071-11096'; 11184-11315' MD
true vertical
9479-9507'; 9521-9543'; 9621~9737' TVD
Tubing(size, grade and measured depth)
3½", 9.2#, N-80 BTC @ 10127' MD
Packers and SSSV(type and measumd depth)
Baker F-1 _~cker ~ 10050' MD~ Camco TRB SSSV @ 291' MD.
12.Attachments
Description summary of proposal []
2778'
8556'
9108'
9864'
RECEIVED
JUN o 7 B89
_Alaska 0il & Gas Cons. C0mmi~]~
' ~ ..... ~chorage '
Detailed operations program r~ BOP sketch
13. Estimated date for commencing operation ·
June, 1989 .:'
14. If proposal was verbally approved
Name of approver
Date approved
15. I_here~;certify that the fqregoing is true and correct to the best of my knowledge
Signed..~-~..,~_~--~f.~':;~J ~x_ Title Emvironme.ntal '.Engineer
P~oy JJ.- ~.obe~,f.s . ' - ' ......../$ .~ -' -'" ' ' ."
· ,,/ ,,// Commission Use Only '.. ~
Conditions of approval
Approved by
Date 6 / 6/,8_9.
L
Notify comm~>%sion so representative may witness I Approval No.
[] Plug integrity [] BOP Test [] Location clearance
Approved CoPY
0RISINAL SIGNE0 BY Returned
~ by order of
LONNIE C. SMITH Commissioner the commission Date
Form 10-403 Rev 12-1-85. Submit in triplicate
WELL TBU K-4RD
COILED TUBING FILL CLEAN-OUT
KING SALMON PLATFORM
OBJECTIVE
Clean-out fill covering lower Bench 3 and Bench 4 to increase injection rate into lower zones and
increase production from offset producers.
pROCEDURE
1. RU coiled tubing unit (CTU), riser, BOPE, and pumping equipment on K-4RD.
2. Pressure test all equipment to 4500 psi.
3. Run in hole with coiled tubing and circulate out fill to PBTD at 11352' MD.
reciprocating bit or drill motor if required for hard fill.
4. RD equipment and return well to injection.
Use
R'ECEIV£D
;IU 0 71 9
~laska 0il a Gas Cons. Commission
Anchorage
COILED TUBIlqG BOPE
3" 10,000 PSI
BOP STACK
I I
HYDRAULICALLY CONTROLLED
PLUG VALVE
COMBINATION
SHEAR/BLIND
SLIP RAMS
PIPE RAMS
4" ACME
LUBRICATOR
10,000 PSI 5 3/4" X
CONNECTIONS
4 1/2" EUE 8RD
TREE CONNECTION
RAMS
Swab Valve
RECEIVED
Double Master ;JUN 07 t~
Valves
Alaska Oil & Gas Cons. commission
Anchorage
Wellhead
GP 5/89
STATE OF ALASKA
ALA,.,,,A OIL AND GAS CONSERVATION COM MI~.
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __
Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __
Change approved program __ Pull tubing __ Variance __ Perforate __ Other
2. Name of Operator
UNOCAL (ARCO is sub-opera-l-or)
3_Address
P. O. Box 190247 Anchorage, AK
99519
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
613' N & 130' W fr. SE cr. Sec. 17, T9N, R13W, SM
At top of productive interval
851' N & 4535' W fr. SE cr. Sec. 21, T9N, R13W, SM
At effective depth
765' N & 4561' W fr. SE cr. Sec. 21, T9N, R13W, SM
At total depth
703' N & 4580' W fr. SE cr. Sec. 21, T9N, R13W, SM
· ,
12. Present well condition summary
Total depth: measured 11,459 feet Plugs(measured)
true vertical 9,864 feet
6. Datum elevation (DF or KB)
100' KB
7. Unit o.,[ Prop.erty na~me
/raa~ ng ~ay Un i-I-
8. Well number
K-4RD ( 14-21 )
9. Permit number
73-42
10. APl number
50-- ~ 33-200-75-01
11. Field/Pool
Hem Iock
11,352' MD
Effective depth: measured 11,352 feet Junk (measured) 11,215 ' MD
true vertical 9,769 feet
Casing Length Size Cemented Measured depth
True vertical depth
Sudace 2,880' 13-3/8" 3675 SM Class G 2,880'
Intermediate 9,952' 9-5/8" 1100 SX Class G 9,952'
Production 10,605' 7" 550 SX' 10,605'
Liner 1,250' 5" 110 SX Class G 11,'459'
2,778'
8,556'
9,108'
9,864'
Perforation depth: measured
11,024- 11,055'; 11,071 - 11,096'~ 11,184- 11,315' MD.
true vertical
9,479 - 9,507'; 9,521 - 9,543'; 9,621 - 9,737' TVD.
Tubing (size, grade, and measured depth)
feet
;.'~; ~ .... ';" r ""ii' [~"
... . ,
.~i'~'~i,;~
3-1/2", 9.2#, N-80 BTC e 10,127' MD.
Packers and SSSV (type and measured depth)
Baker F-1 Packer e 10,050' MD; Camco TRB SSSV e 291' MD.
13. Attachments Description summary Of proposal'Z._ Detailed ope~'ations program
BOP sketch __
14. Estimated date for commencing operation 15. Status Of well classification as:
"APril, 1989
16. If proposal was verbally approved ' Oil
Name of approver Date approved . ' Service' "r~JECT'rON
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Environmental Engineer
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative maY witness
Plug integrity ~ BOP,Test ~ Location clearance ~
Mechanical Integrity Test .7~ Subsequent form required 10-
MIT to be conducted annually (lst.qtr.) until tubi..ng leak is corrected.
Approved by order of the Commissioner
ORIGINAL SIGNED BY
Form 10-403 Rev 06/15/88
Commissioner
Approved Copy
Returned
Dme 4/18/89
J Approval No. ~') _-~ ~
Date
SUBMIT IN TRIPLICATE
Suspended __
f
APPLICATION FOR SUNDRY APPROVAL
REQUEST TO CONTINUE OPERATION
TBU WELL K-4RD
WELL STATUS
Summary:
TBU injection well K-4RD shows communication between the tubing and production casing.
The mechanical integrity of the well was evaluated during a recent waterflood shut-down. Based
on the review of pressure data from this evaluation and the results of AOGCC mechanical
integrity testing, no fluid movement is occurring from K-4RD which would endanger an
. underground source of drinking water.
Backeround:
TBU ~-njection well K-4RD shows pressure on the production casing during injection despite
bleed-off. Mechanical integrity tests have shown slow one-way leaks from the tubing to the
casing, but no casing leaks. Well pressures during a recent waterflood shut down are
summarized, below.
(January 7 - 10, 1989)
K.4RD:
The 7" X 3-1/2" casing annulus held pressure when injection was ceased and tubing ipressure
dropped to zero. The casing pressure increased from 2650 psi to 3050 psi after shut-in probably
due to increasing wellbore temperature. A slight increase was also shown on the 9-5/8" X 7"
annulus also due to thermal expansion. No increase in tubing pressure was recorded.
K-4RD passed the mechanical integrity test in accordance with AOGCC Area Injection Order No.
5, Rule 5 ~on 2/19/88. A wellbore schematic is attached for reference. NOTE: This well 'is
equiped with two strings of casing across shallow water bearing zones (9-5/8" to 9952' MD and
7" to 10,552' MD).
Conclusions:
Based upon the review of pressure data from this evaluation and the results of AOGCC
mechanical integrity testing, no fluid, movement is occurring from K-4RD which would endanger
an underground source of drinking water. Further conclusions are as follows'
1. Injection well K-4RD has one-way pressure communication from tubing to production casing.
2. The production casing holds pressure and the well will pass the AOGCC mechanical integrity
test.
3. No corrective action is deemed necessary to continue safe operations.
ARCO Alaska Inc. is a subsidiary of Atlantic Richfield Company
AR3B-6001-A
ARco laska; Inc.'
.,,ng Bay Unit - King Salmon PIc{ ..,tm
Well K-4RD API : 133-20075-01
Spud Date: 6-14-74 Completion Date: 5-16-77
Original RKB: 100' MD Hanger Type: FMC
Top of Hemlock: 11023 Max Hole Angle: 39 deg @ 8920' MD
Annulus Fluid: Sea water Last Revised: 3-22-89
All Depths are RKB MD to Top of Equipment.
Well Type: Water Injection
New E] Workover J~]
RKB to Hanger: 35'
Angle at Perforations: 28°
Reason: New schematic
B-1
B-2
B-3
B-4
B-5
Jewelry
1 291' Camco TRB ID=2.75"
2 10[k50' Baker "F -1"
3 10127' Tubing tail
Casing and Tubing
.Size Weiaht Grade
13-3/8" 61# J-55
9-5/8" 44&47# N-80
7" 29#
Thread
Top Bottom
39' 2880'
39' 9952'
39' 10605'
10209' 11459'
39' 10127'
5" 18# N-80
3-1/2" 9.2# N-80
BTC
Gas Lift Information
Depth Stn. TV D
2277' I 2260
4261' 2 3895
5623' 3 ~10
Mandrel GLV
KBUG dummy
KBUG dummy
KBUG dummy
Description
Casing
Casing
widow 10552'- 10605'
7" casing to surface
Liner
Tubing
Perforation Data - DIL depths
Zone Too-MD/~ Pert Interv~ FT SPF
1 11023/9380 11024'-11055' 31 8
2 11070/9420 11071'- 11096' 25 4
3 11166/9505 11184'-11232' 48 4/8
4 11225/9957 11232'-11315' 83 8
5 1.1355/9674 no perfs
6 - below PBTD
Gauge Ring and Fill Level Data
Dat~ Size ~ Comment~
10/82 11319' ELM Tagged fill
12/1/85 11215' ELM Tagged fill
3/30/87 11260' SLM Tagged fill
PBTD = 11352' MD
TD = 11459' MD
Datum: 10991' MD (9350' SS, 9450'T VD)
G. A. Graham
District Operations Manager
Alaska District
Unocal Oil & Gas D~" ~n i.
Unocal Corporation ~..
PO. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL
August 3, 1987
Mr. Blair Wondzell
AOGCC
3001 Porcupine
Anchorage, AK 99504
Dear Mr. Wondzell:
'As'"'unit operator of Trading Bay Unit, Unocal is forwarding a report of
· operations regarding a pressure test made by ARCO Alaska, Inc., on injection
.. well K-4RD. Based on this test, we believe well K-4RD is operating in a safe
,..and envi. ronmentally sound, manner.
:lp
Enclosure
Very truly yours,
G.A. Graham
Trading Bay Unit Operator
RECEIVED
AUG 1 0 ]~87
Alaska Oil & Gas Cons. COnllaiSSloD
Anchorage
Report of Well Operations
(Pressure Test TBU Injection Well K-4RD, King Salmon Platform)
May 22, 1987
.
.
m
m
Si
.
Installed calibrated pressure gauges on 3-1/2" X 7", 7" X 9-5/8",
and 9-5/8" X 13-3/8" annuli and 3-1/2" tubing.
Starting pressures:
3-1/2" tubing @ 2950 psig (inj. @ 8500 BWPD);
3-1/2" X 7" annulus @ 2015 psig;
7" X 9-5/8" annulus @ 300 psig; and
9-5/8" X 13-3/8" annulus @ 0 psig.
Pressured 3-1/2" X 7" to 2350 psig. 7" X 9-5/8" pressure at 340
psig. Monitored both annuli for 45 minutes. No bleed-off (no
communication across 7" casing).
Pressured 7" X 9-5/8" to 1500 psig. 9-5/8" X 13-3/8" pressure at 50
psig. Monitored for 5 minutes. No bleed-off.
Pressured 7" X 9-5/8" to 2100 psig. 9-5/8" X 13-3/8" pressure at
150 psig. Monitored all annuli for 75 minutes. No bleed-off
(no communication across 9-5/8" casing).
RD and returned K-4RD to injection.
AUG 1 019~7
Nasim Oil & Gas Cons. Commission
Anchorage
PC~T ~
· ---.. --
l
11 i ,
iiii
im
i ,
~
i I i
TOP
PACKER:
NIPPLE: . , ,
TUBING TAIL: /o/a
BOTTOM
PACKER: .
NIPPLE: , ,
· TUBING TAIL:
STATUS
·
·
·
/:,,,/, ,u
6/20/84
,
SC)Gle40O2 REV. 2
i · ii
ARCO Alasks. ;. ~
¢os[ '$~e Box 190360
Ar;chorage. :;,laska 99510-0360
Te!ephone 907 276 1215
Cook Inlet/New Ventures
Engineering
July 23, 1987
Mr. G. A. Graham
UNOCAL Corporation
P.O. Box 190247
Anchorage, AK 99519-0247
O'
Dear Gerry'
Enclosed is a report of operations requested by Mr. Blair Wondzell of
the AOGCC regarding a pressure test made by ARCO Alaska, Inc. on injec-
tion well K-4RD. Based on this test, we believe well K-4RD is operating
in a safe and environmentally sound manner and would like to communicate
this to the State. As unit operator, please forward the enclosed
information to Mr. Wondzell.
If you have any questions on this matter, please call Clay Borden at
263-4926.
Sincerely,
H. F. Blacker'
Regional Engineer
HFB'ALM:cl'O038
Enclosure
cc' Mr. Roy D. Roberts (Unocal)
Well File K-4RD (W1-3)
RECEIVED
AUG 1 4 1987
Naska Oil & Gas Cons. Commission
Anchorage
Report of Well Operations
(Pressure Test TBU Injection Well K-4RD, King Salmon Platform)
May 22, 1987
.
e
Installed calibrated pressure gauges on 3-1/2" X 7", 7" X 9-5/8",
and 9-5/8" X 13-3/8" annuli and 3-1/2" tubing.
.
Starting pressures:
3-1/2" tubing @ 2950 psig (inj. @ 8500 BWPD);
3-1/2" X 7" annulus @ 2015 psig;
7" X 9-5/8" annulus @ 300 psig; and
9-5/8" X 13-3/8" annulus @ 0 psig.
Pressured 3-1/2" X 7" to 2350 psig.' 7" X 9-5/8" pressure at 340
psig. Monitored both annuli for 45 minutes. No bleed-off (no
communication across 7" casing).
4,
Pressured 7" X '9-5/8" to 1500 psig. 9-5/8" X 13-3/8" pressure at 50
psig. Monitored for 5 minutes. No bleed-off.
5. , Pressured 7" X 9-5/8" to 2100 psig. 9-5/8" X 13-3/8" pressure at
150 psig. Monitored all annuli for 75 minutes. No bleed-off
(no communication across 9-5/8" casing).
6. RD and returned K-4RD to injection.
RECEIVED
AUG 1 ]987
Rla~'ka Oil &'Gas Cons. Commi~io~
AnChorage
[6/20/8~
i i
-- mi
ii -- i
-- i i ·
i ii
__
TOP
PACKER: ,~ ~-,/'
NIPPLE:
TUBING TAIL:
BOTTOM ,
PACKER:
NIPPLE:
· TUBING TAIL:
BENCH OATA
/IZ&O' mo(~u¢g~,~) S/~qf~TpERFORAl.I ON RECORD
PBTD: //3~'~ _
TO:
RECEIVED', ,
AUG 1 4 1987
iim
Naska Oil & Gas Cons. Com~!~f~n
Anchorage
ii ,
m
STATUS
·
8.
,~/,
&
-- ,
ii
~ ! 84002 ;~E
·
Environmental Group
Alaska District
Unocal Oil & Gas Dij"
Unocal Corporation ~,
R O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL
August 3, 1987
Hr. Blair Wondzell
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Ak. 9~501
Dear Mr. Wondzell:
· Report of Operations
~~ K-4RD~ King. Salmon Platform
As operator of the Trading Bay Unit, Unocai is transmitting the attached
~e_~of operations on injection weii K-4RD. Shouid you have any questions
regar~--di-~this report, piease contact Mr. Biacker at ARCO Alaska, Inc. .
Very truly yours,
i" z/~,~ ~ ,...'"~,-&.~,.~:~</~"~:~-"~.
Candace Lockwood, '~---~.,.
Environmenta~ Department
cwl
attachment
cc: G.A. Graham
'%
ARCO Alask?, I(
.:"'s~,~ C~;''~-,,,~.~ ~ox 100360
Anchorage. ,t, 1aska 99510-0360
."'.-:;epi~one 907 276 1215
Coo~< Inlet/New Ventures
Engineering
July 23, 1987
Mr. G. A. Graham
UNOCAL Corporation
P.O. Box 190247
Anchorage, AK 99519-0247
O'
O'
?
Dear Gerry:
Enclosed is a report of operations requested by Mr. Blair Wondzell of
the AOGCC regarding a pressure test made by ARCO Alaska, Inc. on injec-
tion well. K-4RD. Based on this test, we believe well K-4RD is operating
in a safe and environmentally sound manner and would like to communicate
this to the State. As unit operator, please forward the enclosed
information to Mr. Wondzell.
If you have any questions on this matter, please call Clay Borden at
263-4926.
Sincerely,
H. F. Blacker
Regional Engineer
HFB:ALM:cl'O038
Ertcl osure
cc: Mr. Roy D. Roberts (Unocal)
Well File K-4RD'(W1-3)
· %3C0 Alasi(a, Inc, ~s a C:ubs,chary ol a~ ~,~ii~,R chhe,clComoan¥
Report of Well Operations
(Pressure Test TBU Injection Well K-4RD, King Salmon Platform)
May 22, 1987
.
m
.
.
.
.
Installed calibrated pressure gauges on 3-1/2" X 7", 7" X 9-5/8",
and 9-5/8" X 13-3/8" annuli and 3-1/2" tubing.
Starting pressures:
3-1/2" tubing @ 2950 psi, (inj. @ 8500 BWPD);
3-1/2" X 7" annulus @ 2015 psig;
7" X 9-5/8" annulus @ 300 psi,; and
9-5/8" X 13-3/8" annulus @ 0 psig.
Pressured 3-1/2" X 7" to 2350 psig. 7" X 9-5/8" pressure at 340
psig. Monitored both annuli for 45 minutes. No bleed-off (no
communication across 7" casing).
Pressured 7" X 9-5/8" to 1500 psig. 9-5/8" X 13-3/8" pressure at 50
psig. Monitored for 5 minutes. No bleed-off.
Pressured 7" X 9-5/8" to 2100 psig. 9-5/8" X 13-3/8" pressure at
150 psig. Monitored all annuli for 75 minutes. No bleed-off
(no communication across 9-5/8" casing).
RD and returned K-4RD to injection.
SPUO I:)ATE:_~/'''''¢' .-/. ~,,/-,//, '
GIIZGZIMI. RKB: /Ch/ , H(X,E ANGLE AT
ALL. OEPTHS ARE TO. TOP E3r EQUZI:~k~NT. GOM)L£TZON
ALL. C~PTH8 ~ RKi Id). I~S~RVOZR D~TUId '
7' ,,,?~'"' ,', =,,.,'~-'-. TOP OF L.[IqE. R ~'/a~ /v- #o ~,,'
,,,,.;.(,,,;/~,-..ca-/=~,a..~ GAS L.~FT ASSEI~LY ,a'oe- //,,/.r~
STA I~) ~ ~ PORT
/ .~.~ 77 -L ~&,o -~b~F../Z.(r- - _ --
~ ~ .~'~/o ~ . - .... -
ii
i! i
i
i
6/20/84
ii
TOP
PACKER:
NIPPLE:
TUBING TAIL: /~/a
BOTTOM
PACKER:
NIPPLE:
· TUBING TAIL:
·
BENCH DATA
STATUS
?'~=F,/,~'
·
,b.,/, ...., ?~,,r-~
S,Pc.
·
i
ii ii Il , , I
-- SC)St 8d~OOZ ~£v.
~ STATE OF ALASKA Ji~
ALASKA ,L AND GAS CONSERVATION C ' MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
OTHER I~ I ' ~
Wtr. nj.-~-
1. DRILLING WELL []
COMPLETED WELL []
2. Name of Operator
UNION OIL COMPANY OF CALIFORNIA*
3. Address
P. 0. Box 6247, Anchorage, Alaska 99502
4. Location of Well
613' N & 130' W from SE corner, Sec. 17
T9N, R13W.
7. Permit No.
8. APl Number
50- 133-200-75-01
9. Unit or Lease Name
Tradinq Bay Unit
10. Well Number
K-4 RD
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
KB 100' above MLLW I ADL 17594
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
McArthur River-Hemlock
NOTICE OF INTENTION TO:
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
SUBSEQUENT REPORT OF:
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting anv
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interval was reperforated November 1980:
11,250' - 11,292' DIL
* ARCO Alaska, Inc. - Sub-operator
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
v~,/?/~-!.
S ig n ed ~/~ J i.~l~/~~ Title
The space bel~ f~:C°~' 'on use
Conditions of Approval, if any:
Date
Ma~ch 21. 1983
:,
By Order of
Approved bv COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports"in Duplicate
February 16, 1953
Union Oil Company of.California
P.O. Box' 6247
Anchorage, Alaska..9 9502
Subsequent Reports, SUndry ~Iotices and Reports on Wells
(Form 10-403)
For the following lists of "Notice of Intention To:" Sundry
Notices and Report~ on Wells (form 10-403) this office does not.
have on record the "Subsequent Report of:" defining the
action taken on. the aPproved intention. Please advise this
office by Subsequent Report of the disposition of the intention.
Wel I Union Date
Brief Description_ of _Intention
TBU G-
TBU G-SRD
TBU 'G-23RD
TBU' A-11L
TBS' F.-4PD
GPS 33-14RD
~BU 13-8
TBU D-9
TBUS C-27
TBUS G-6
TBU D-6RD '
TBU G-7
TBUS G-2
TBUS G-3
K-lAD
10/1/80
10/1/80
10/1/80
lO/1/ o
11/6/80
2/11/81
6/1/~1
6/e/81
11/25/81
3/18/82
4/21/82
5/24/8.2
'6/30/~;2
7/14/82
Reperforate ¢-3, C-4
Reperforate B-l, ' B-2, B-4
Reperforate B-5, B.-1, B-4
Reperforate
Reperforate '
Perforate B zone
Clean out, reperforate.
Plug &" abandon for sidetrack
Pull tubing, roperforate
Squeeze cement to abandon
hemlock
Change kickoff point
Reperforate
'Revise Setting abandonment
retainer
Repai r. ca~
~erforate
Sing. erely, ;.-'
!,.:.. ...... , ..... ,'fl...;,... ..... ...,..,.
"~onnie C. S~'-~th
Commissioner
LCS/JKT/g lh
Forr~*~ 10-403*
REV. 1'-~,0..73
Submit"intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE 0~'..LASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
[Do not use this form for proposals to drill or to deepen
Use ,,APPLICATION FOR PERMIT---" for such proposals.)
Water Injector
". O,L I'--I sas I--I
WELLL.-I WELL OTHER
NAME OF OPERATOR
Union Oil Co. of California*
~, ADDRES~ OF OPERATOR -
909 W. Ninth -Ave.,,Anchorage, Alaska '99502
4. LOCATION OF WELL
. .
·
At surface
613' .N ~ 130' W fr SE ·Cr, Sec 17, TgN;" 'R1Bw,
..
.
..
...1~. ELEVATIONS (Show whether DF, RT, GA, etc.)
· . .
-j...P, NU,~ERICAL CODE ,~'
50-133-200-75-01 -~1
6. LEASE DESIGNATION AND SERIAL NO-. ~f
ADL 17594 -r ~
7. IF INDIAN, ALLOI 'i'EE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Tradinq Bay Unit
9. WELL NO.
· .
K-4~d (14-21)
ld. FIELD AND POOL. OR WILDCAT
McArthur River - Hemlock'
11. SEC.,T., R., M., (E~TTOM HOLE OBJECTIVE)
Sec 21, T9N, R13W .
~2. ,PERMIT NO: ......
%
NOTICE OF INTENTION TO:
"r-----ir, :'~':' ~
"'TEST WATER SHUT-OFF r'~, PuLL OR ALTER CASING
FRACTURE TREAT ~ ' MULTIPLE COMPLETE ..
' SHOOT OR ACIDIZ[ I I ABANDON* .
REPAIR WELL ' ' I ! CHANGE PLANS
'(O,h.0 Reperf ex~stin9 intervals. .
KB 100' above FiLLW :'
Check Appropriate Box To Indicate Nature of Notice, Re
)oft, or Other Data
· '. SUBSEQUENT REPORT OF;
WATER SHUT-OFF' REPAI RING WELl-
FRACTURE TREATMENT . ALTER'lNG CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
· (NOTE.: Report results, of multiple completion on Well
Completion or Recompletion Report and Log form.)
DESCRIBE PROPOSED OR COMPLETED'OPERAT:ONS'('Clearly state all pertinent details, and 91ve pertinent dates, including estimated ~te of
· .sta~ln9 any proposed work.
We pr.ope.se'to reperforate the' f011owin'g..intervals:
11-250-11292. ~IL
,
Estimated date of' work:· Oc'~ober,'
1980 . ' .. ,'
·
.
..
·
.,
.. ..
' ,.
....
.,
·
· . , .
. .
· .'....
'- ' -e~t Wo~l~'~e~-~ ..~ , .
;mi ~.~.,~o. ~O~.~ '
;. . .. . . ..:; ' ,,..' ' . .-
.,.
· , : .,
.
. ,
.. .
*ARCO' Oil. and~ Gas '~omPan. Y, Sub-ope~ato~'
lS. I hereby~~~ ~ .~.~ fo.regolng Is true and correct
SI--NED C. H. Case '' ' ' TITLE District Eneineer'
,. '.' .. , ,.],,: .. ,, , f?., - _
· {'This sp'ace for Stale 'O~fl~.~ UA) ' \ .· .~x{*l'"' >,.
.. CONDIT./ONSOF APPROVAL, IF ANY'- ~J
..
DATE- 11-06.80.
DATE
· .
.,
See, Instructions On Rev~r~e Side '
Union Oil and Gas [. ,,~q! Western Regk
Union Oil Company of California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
union
June 14, 1977
Mr. Hoyle Hamilton
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Mr. Hamilton'
Enclosed for your approval is Subsequent Report of Sundry Notices
and Reports on Wells for TBS K-4, King Salmon Plaform.
Si ncerely..~rs,
'-..O.~_~. Cal lender
District Drlg. Supt.
sm
Enclosure
cc'
Harry Lee
USGS
Marathon Oil Co.
Atlantic Richfield Co.
CHEVRON, USA
Phillips Petroleum Co.
Getty Oil Co.
Amoco Production Co.
Form 10-403
REV. 1-10~73
Submit "intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
3.' O,L I--'1 GAS r-']
WELL[~I WELL OTHER Water in~ection well
2. NAME OF OPERATOR
Union Oil Company of California *
3. ADDRESS OF OPERATOR
909 W. Ninth Ave~ Anchorage, AK 99501
4. LOCATION OF WELL
At surface Conductor 11, Leg 2, King Salmon Platform
613'N & 130'W fr SE Cr Sec 17, T19N, R13W, SM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
100' RKB
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-133-20075-01
6. LEASE DESIGNATION AND SERIAL NO.
ADL 17594
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Trading Bay Unit
9. WELL NO.
K-4 (14-21) Redrill
10. FIELD AND POOL, OR WILDCAT
McArthur River-Hemlock
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec 21, T9N, R13W, SM
12- PERMIT NO.
)ort, or Other Data
NOTICE OF INTENTION TO.'
SUBSEQUENT REPORT OF:
TEST WATER SHUT-OFF ~,, PULL OR ALTER CASING ~, m .WATERSHUT-OFF ~ REPAIRING WELL
FRACTURE TREAT ~ MULTIPLE COMPLETE ~ FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ~ ABANDON* L_~ SHOOTING OR ACIDIZlNG ABANDONMENT*
I I
I I
REPAIR WELL I J CHANGE PLANS ~1 I _~-(Other) _.~
(Other) Convert to wate~ ini ection ~ I I ~-'~OTE: Report results of multiple completion on Well
"-----' Completion or Recompletion Report and Log form.)
3.5. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
Killed well. Pulled & laid down tbg stcing, Drld out cmt f/11,075-11,352'.
Tstd 5" liner lap & 7" csg to 3500 psi, Set Baker MOdel F-1 pkr @ 10,050'
& ran injection string w/sub surface control valve .@ 291', Perf'd 11,315'
thru 11,194' & 11,054' thru 11,026'.,. Well was placed on water injection
Ha7 22, [_977~ ....
*Atlantic Richfield is Sub-Operator
RECEIVED,
JUN .1. 6 i977.
Division of Oil & ~.~ C~' ..... '''
/y/ Anch0r~¢e
16. I hereby certl at the fp~9tfl"g is true and correct ,
p~e'~ d lm K - ba I I enaer ;Dist. Dr~_~. Su.o~.
(This s r State office use) '
DATE
6/14/77
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY.'
TITLE
DATE
See Instructions On Reverse Side
Union Oil and Gas [~ sI,.,, ' Western Region
Union Oil Company of California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
unlln
June 15, 1977
· .Mr. Hoyl e Hami 1 ton
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, AK 99504
Dear Mr. Hamilton'
Enclosed for y~formation are three copies of the Monthly
Report for T S~nd TBUS K-7.
incerely. yours ,
....... \',,,~ , ~'
~., Drlg. Supt,
sm
cc- USGS
Harry Lee
Marathon Oil Co.
Amoco Production Co.
Phillips Petroleum Co.
Getty Oil Co.
CHEVRON, U.S.A.
~"~ ~"' ~ STATE OF ALASKA
ILEV. I- 1-70
OIL AND GAS CONSERVATION CO/V~II-i'EE
SUBMIT I~ DL~LICAT'E
MONTHLY REPORT O'F DRILLING
AND WORKOVER OPERATIONS
1.
o,L [] o,,, [~( o,,,, Water injection well
W~LL
2. N~tME OF OP~TOR
Union 0il Company of California *
3. ADDR~S OF
Box 6247, Anchorage, AK 99501
4 LOCATION OF W~-T-T-
Conductor ll, Leg 2, King Salmon Platform
613'N & 130'W fr. SE Corner Sec. 17,
T19N, R13W, S.M.
,t'
AP1 NL~ERICAI, CODE
50-]33-20075-0]
LEASE DES:GI~tAT~ION AND SERIAL NO
ADL-17594
IF INDIA]ff. ALOTT'EE OR TRIBE I~AME
8. L','IT F.z~P~M OR LEASE N~ME
Trading Bay Unit
9 \v~LL NO
K-4 (14-21 Redrill
10 FLF. J~D A_ND POOL. OR %VILDCAT
McArthur River - Hemlock
IL SEC . T.. R. M (.BO~'OM HOLE
12. PEP,MIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET A_ND VOLITMES USED. PFJ~FORATIOI~S. TESTS A.ND H.ESULTS FISHING JOBS JUNK LN HOI.~E AND SIDE-TI:~ACKED HOLE
AND ANY OT'HY_~ SIGNIFICANT C~t~.*~TG~ ~N HOL~ CONDITIONS
5/4/77 - 5/19/77
Killed well. Pulled & laid dwn. tbg. string. Drilled out cmt. from 11,075' to
11,352' Tested 5" liner lap and 7" casing to 3500 psi. Set
packer ~t 10,050' & ran injection string w/ sub surface contr(~alve at_~2_~]....i...
Perforated from 11,315' to 11,194' and 11,054' to 11,026'. Well was--p-T~a-"~)n
water injection May 22, 1977.
*Atlantic Richefield is Sub-OPerator
m~ :~L~ Dist. Drlg. Supt. ~ 6/15/77
NOTE --Report on this f~ is requi~d ~r each calendar mnths regardless ~ the status of operations, end must ~ filed in dupli~te with the
oil and gas conservatbn comm iflee by the 15~ of fha sue~4ing mn~, ~le~ Otherwis, d~rscted.
Dear Mr. Hamilton.
Union Oil and Gas I~" _.,: Western
Region
,.
Union Oil Company of California
P.O. Box 6247, Anchorage, Alaska 99502
Telephone: (907) 276-7600
...
. '.',~ ~-.
union
...: "/
D~v~s~on of 0~1 & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Enclosed for your approval is a Sundry Notice and Report on
Wells form for K4 (14-21) Redrill.
Si ncerel y yours,
Dist. Drlg. Supt.
Form 10-403
RE¥. 1-10-73
Submit '41 ntentlons" In Triplicate
& "Subsequent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
5. APl NUMERICAL CODE
50-133-20075-01
6. LEASE DESIGNATION AND SERIAL NO.
ADL 17594
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
1. el- !'-I GAS !'--I
WELLL._I WELLL~i OTHER Nater Injection Nell
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA*
3. ADDRESS OF OPERATOR
909 W. Ninth Avenue~ Anchoraqe~ AK 99501
4. LOCATION OF WELL
At~,ce Conductor ll, Leg 2, King Salmon Platform
613' N & 130' W fr SE cr Sec 17, T9N, R13W, SM'
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
115' RKB
Check Appropriate Box To Indicate Nature of Notice, Re
8. UNIT, FARM OR LEASE NAME
Tradin§ Bay Unit
9. WELL NO.
K4 (14-21 ) Redri 11
10. FIELD AND POOL, OR WILDCAT
McArthur River - Hemlock
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 21, TgN, R13W, SM
12- PERMIT NO.
)orr, or Other Data
NOTICE OF INTENTION TO-'
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
FRACTURE TREAT ~ MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAi R WELL CHANGE PLANS
(Other) Convert tn water injection well
SUBSE(~UENT REPORT OF-'
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR AClDIZlNG ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE.PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
~arting any proposed work.
The subject well was completed in the Hemlock Zone on 8-22-74. Perforations are from
11,025-55' and 11,071-96'. After a short clean-up period, the well produced a
maximum of 1250 BOPD with a 2% cut. The water cut started increasing in December,
1974. Present production is 169 BOPD and 505 BNPD.
We propose to clean out this well to 11,350'± and convert to water injection to
improve the water flood sweep efficiency in the Hemlock reservoir. New perforations
will be added to Hemlock Benches 2, 3, & 4 between 11,096' and 11,340'. The well
will be produced for a short period to clean up the perforations, then put on
injection. After running an injection profile, additional stimulation (acidizing)
may be required.
A 3000 psi double Shaffer gate an.d GK Hydril
weekly.
BOPE wi ll
be installed and tested
APR
*Atlantic Richfield Company is sub-operator
SIGNED ·
(This s a~,e~ for State office use)
16. I herel~
TITLE
Dist. Drlg. Supt.
ONDITION$ O~//~I~PpROv~AL, IF/~NY: '
TITLE
See Instructions On Reverse Side
DATE z-//~- 7 /-
Apftmved Copy lie .t~med
Form 10-403
REV. 1-10-33
Submit "1 ntentlons" in Triplicate
& "Subsequent Reports" In Duplicate
' STATE OF ALASKA
0IL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to (lrill or to (leepen
Use "APPLICATION FOR PERMIT---" for such proposals.}
O,L r::'l_ GAS I--1
WELL ~[.~ WELL L--J OTHER
2. NAME OF OPERATOR
Union Oil Company of California*
3.' ADDRESS OF OPERATOR
909 W. 9th Avenue, Anchoraga. Alaska 00501
4. LOCATION OF WELL
At surface
Conductor 11, Leg 2, King Salmon Platform
613' N & 130' W from SE corner Sec. 17, T9N, R13W, SM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
100' KB
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-133-20075-01
6. LEASE DESIGNATION AND SERIAL NO.
ADL 17594
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Trading Bay Unit
9. WELL NO.
10. FIELD AND POOm', OR-W-lEO-OAT
McArthur River - Hemlock
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 21, T9N, R13W, SM
12. PERMIT NO.
73-42
)ort, or Other Data
NOTICE OF INTENTION TO:
r'-'"l
I'---1
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
FRACTU R E TREAT MU LTIPLE COMPLETE
SHOOT OR AClDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Test for ~vater
SUBSEQUENT REPORT OF:
WATER SHUT-OFF [~ REPAIRING WELL
FRACTURE TREATMENT H ALTERING CASING
SHOOTING OR ACIDIZlNG ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, an(l give pertinent (lates, inclu(ling estimate(l (late of
starting any propose(l work.
Trading Bay Unit State K-4RD is currently a low rate producer in Hemlock Benches 1 and 2.
The low rate and steep decline (55%/yr.) indicate that this well has marginal future utility
as a producer. It is proposed to temporarily test this well for water injection. This would
be the third such conversion on the west flank of the Trading Bay Unit and will continue a
conversion program to increase reservoir sweep efficiency and optimize reservoir pressurization.
A temporary injection, test will provide information concerning a possible "thief" interval
which would have a direct bearing on a workover program for permanent conversion.
PROPOSED PLAN OF PROCEDURE:
1. Install temporary water injection lines.
2. Begin injectivity test.
3. Establish a stabilized injection rate.
4. Run an injection profile log over the perforated interval.
5. Evaluate for permanent conversion.
E IVED
'"': C.
APR - 51977
ESTIMATED STARTING DAT. E: April 10, 1977
*Atlantic Richfield Company - Sub-Operator
16. I hereby certify that the foregoing Is true and correct
CONDITIONS O,F,~, I~.~O "L,' .... ~E.~' '
TITLE DISTRICT ENGINEER
DATE .Apr LL...1.,-1977
See Instructions On Reverse Side
DATE
Approved Copy
Returned
.,~ ·
AtlanticRichfieldCompan,~-,~.-a~ /-
Equipment'Perforrnance heport: Offshore~.
(1-2) (3 8) (9 _ 11) (12 ~ . -..-C15) . (16 -- 20)
~ ~ II :.1,,I I I:.__ '1/,:t,/l '
Lease or Tract or '~_~Setting ..
unit no. section ~ Well .-~"'
. /..i depth .
(21-22) (23-24) (25-26)
i l~lG-I-711--~t-',,,!
Month Day Year
Date report completed
Latest test data
(45 49)
I ! !l,;-I .sl,~ I
Barrels oil/day
(27-28) (29-30) (31-32)
Month Day Year
Date device removed, or
well shut in
(50 54)
Barrels water/day
(33-34) (35-36) (37-38) (39~40) (41-42) (43-44)
Month Day Year Month Day Year
Date device replaced or Date of latest test
well producing
(55 60) (61 65)
I I I T'";: I; I"'l I I I'-;'i ' I:']
MCF gas/day Flowing TBG pressure
(66 70) (71 75)
Shut-in tbg pressure
Approved production
rate
(76 _ 80)
Rate SSV designed to
close
Type of device
OTR
01 PSN
02 PSR
O3 CSN
04 CSR
05 DCV
06 SEP
07 CCV
08 SDC
O9 TPL
10 DPR
11 STV
(1-2)
Other (explain)
Sub-surf. prod. sensitive: non-retrievable ~ [E ~1[l 01
Sub-surf. prod. sensitive:retrievable ~ ['~ ~ ~ [~ ,~, 02
Surf. control sensitive: non-retrievable 03
Surf. control sensitive: retrievable
Reason for shut-down
Downhole control valve
Separation tool
Circulation control valve
Side door choke
Tubing plug
Downhole pressure regulator
Standing valve
SE? ~ ? 197,)
D!V'.$1Ot'4 OF ~.L AND GAS
A.~CHORAGE
O4
O5
O6
O7
O8
O9
10
FAL
FAO
WWR
MAN
ABA
TST
UNK
(3-4)
OTR Other (explain)
INS Inspection
NEW Install new devices
BHP Bottom hole pressure survey
Device failure
Other equipment failure
Well workover
Maintenance
Abandon
Testing
Device closed: reason unknown
Location of failure (5-6)
NON None (device operative)
01 JKD Junked 10 BEX Bean extension
02 SPR Spring 11 SPR Spacer
03 BLL Bellows 12 RNG O-ring(s)
04 VAL Valve 13 CON Control line
05 VAS Valve seat 14 SEL Seal
06 BAL Ball 15 EQD Equalizing device
07 BAS Ball seat 16 LOC Lock assembly
08 PST Piston, disk 17 FNK Fishing neck
09 BEA Bean 18 OTR Other (explain)
Cause
(11 12)
NON None
:1 COR Corrosion
2 ABR Fluid cut
3 SND Sand
4 PAR Paraffin
5 SCL Scale
6 HDL Handling
7 APL Application
8 UNK Unknown
90TR Other (explain)
Action taken
(13) (14)
OTR
I RER
2 RPA
3 RPL
4 JKD
5 CHG
Other (explain)
Rerun
Repaired
Replaced by different
Junked
Changed closure
setting
(15 26)
lc I~ !-.;,!~_ I-I T I I I Iii
Manufacturer and model (left justified)
(27 32)
Ticket number
(37-38) (39-40) (41-42) (43' 50)
!11 ~"~/~~--~Inches I'111 T llll
# Spacers Bean size Spring #
(33 36)
Hours down
(51-52) (53-54) (55-56)
notified
Month Day Year
Remarks--use for information which should be part of the record. Please print (left justified)
57 60 65 70 75 80
I~:l---'~l-,~! I:';I ! I-.-,~!'-!,"1,'?i-"~-I I~-I I~'1-' I.'~'l !-,I,,'1 I I I
Other remarks .~ -~
AR3B-1980
ISignature / ..'
;,
Document Transmitt;~;
Union Oil Company of C: 'nia
union
DATE SUBMITTED ACCOUNTING MONTH
9/11/74
TO FROM
Harry W. Kugler R.C. Warthen
AT State DiVo of O il & Gas AT
3001 Porcupine Drive Anchorage
Anchorage, AK 99504 TE~EP,ONE,O.
TRANSMITTING THE FOLLOWING:
i
Atlantic Richfield TBU K-4 Re:drill:
9."
5" DIL
2"
5." Sonic
5" CBL
Final logs, Sepias & Hluelines
n
.~- ~ ,~. ~ :
,.
~#'7. '~ .......... ' .......
..,
FORM :369 (REV ='/70) PRINTED IN U.S.A.
Union Oil and Gas Di.vfi:~ 'Western Region
Union Oil Company', California
909 W. 9th Avenue, Anchorage, Alaska 99501
Telephone: (907) 279-7681
unlln
.AuB~tst 10, 1974
}tr. Homer Burrell
Division of Oil ~ Gas
State of Alaska
3001 Porcupine Dr.
Anchorage, Alaska 99504
FILE:..
--
P,E: TBUS K-4 'I~3) (14-21)
...?3U. S,. ~~ '(]7!_9)
Dear ~/r, But'tell,:
Bnclosed for your fi, les are two (2) copies each, of
the ,.C~p, letion ~.~rt and Survey. for well TBUS K-4
Redrxll, King Salmon Platform. Also enclosed are
three (3) copies of the Suna~y. Notices 6 Reports
on Wells for well TBUS 'K-1 Workovor.
Very truly, yours.,,
Jim R. Callender
District Drlg. Supt.
sk
mci. (7)
cc:
Marathon
Arco
Socal
Skell¥,
?hillips
Amoco
'Rodney Snith/OS~S
I"tH'~',l P. ?
SUBMIT IN D CATE*
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
Ia. TYPE OF WELL: on. ~ ,;AS ~ []
W El.I, WEI. L ~_~ DRY Other
b. TYPE OF COMPLE~ON:
WEI.I. OVeR ~ EN ~ACK RE,YR.
~. N&ME OF OPERATOR
union Oil Company of California *
ADDRESS OF OPERATOR
909 W. 9th Avenue, Anchorage. Alaska
st ~f~ Conducto~ 11, Leg 2, King Salmon Plat~o~
613'N 'W ,
829'N ~ 754'E fr SW cr Sec 21, TgN,. R13W, SM
At total dep~
645.'N ~ 697'E fr SW cr Sec 21., TgN, R13W, SM
~. APl N~F./~/C.~L CODE
50-133-20075-01
~. LEASE D~IGNA~O~ ~WD SER~L NO.
ADL 17594
'/. IF INDIAN, AJ.~O~TEE OR TRIBE
'8. UNIT,FA.R&~ OR LF-~kSE NA3IE
:Trading BaM Unit
~. WELL NO.
K-4 (14-21) Redrill
10. FIELD AND POOL, OR WILDC&T
11. REC., T., 1%., M., (I~OTTO1VX ~-I-O~- .....
OBJECTIVE)
Sec 21, TgN, R13W, SM
12. P~XXT NO.
73-42..
" ELEVATIONS (DF, ].{KB, RT, GR, 5~PC)® 17. ELEV. CASINGHEAD
6-14-74 . 8-8-'74 . 8-21-74 RKB 100' above ,~SL
TO~AL X~PTI-L ~LD & TVD 119. PLUG,. B~CK MD & TVD~0. 1~ 1VEULTIPL~. CO1V~P-L., 121. '
~' -I1---4~ r~'- [ .11,352 'MD / sow ~Y. ~oT~ ~oo~, c~.,.~ ~oo,.,s
~ .a~,~m / a' vw,~m /Single 10.gg2.'.to ll_A_g~
=, PR~f~0 ~RVAL(S), OF~fS' ~O~TION~P, BO~O~ NAM,~ (MD AND ~)' '
Hemlock 11,02S.- ll,.OSS~ MD ~ 11,.071' - tl:,O~6~MD ~47~~ - ~506~'~D ~ ~,520.~ - ~.542.~.
24. TYPE ELECTHIC AND OTH~ LOGS RUN
..
~. DIL, GR-Sonic., G~CemOn~ Bond.
CASING ~CORD (Re~rt all strings set in well)
CASING SIZE WEIGHT, LB/.FT. DEPTH S~T (MD) HOLE SIZE
13 3/8"
9
7I!
26. LINE~
SIZE 't TOP(MD) I BOTTOM (MD) I SAC;I~S CEMENT'
2,. 5" '_ }10,209F . .t11,439'' [~10 Class ,[
PE~OR.ATIONS OP~ TO
11,02S.- ll,0~S~. .26~' ~ SP~
ll,.0Yl - 11,096 .26~'.
CER{~N'TING REC O P~D
23. WAS DIRECTIONAL
SUR.V~ MADE
Yes
I AN[CUNT PULLED
27. TUBING REC,O'P~D
Sca, mm~ (~D). .~SIZE1/2". It' 1 N; 161DEP'ffi{ SET, (~D),
29. ACID, Si!CT, FiI.~CTffIIE, C~%iE'NT SQUEEZE, ETC.
DF~PTIi IN'I'F,;RVAL (MD) AMOUNT AND I4'!ND OF I~AI~PdAL USED
30.
DATE FIRST Pf{.OD'UCTI. ON
8/21/74.. .
D~. '0'F T'ST, ' l-~O U'RS .'['I~STED r IC~'iO__~4~E SIZE [PROD'N FORTES'
.__8~1./74... 12 i i/a-
FLOW] TUBING- ,CA~[NG PRESSURE [CA~C~ OZ~BBL.
I~5S. [~-HO'UR
Inn 980 ,I ~ 936
P~ped to shore
PF~OD UCT1ON
~%ODUCT1ON IVIEI.[{O.D (Flowh~, gas lif~, puzflplng--size and type of pump) ~%VELL S'FATUS (Producing or
GA~-Z~C~. W&~BBL. ~ OIL GRAVI~I' (CO~.)
I ~88 J 20.
ITEST WITNESSED
Don Farris
32. LIST OF ATTACHMENTS
0Den hole lo~s § dir0¢tional sn~vev .
/ .
SIGN ~ TITLE '~'.'.D~lg . ., __ .................
,, ~/Jim 'R. Callender, . . . . .Supt".', .... :'. )a~z 9/1~.74.
* Atlantic Richfield Comply - Sub - Operator
. .
INSTRUCTIONS
General: This form is designed for submitting a complete ~nd correct we!l completion report and log on
all types of lanJs and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (whe:'e not otherwise shown) for depth measure°
merits given in clher spaces on this form and in any ~ttachme.qts.
Items 20, and 22:: If this well is completed for separatc prcduction from more than one interval zone
(multiple completion), so state ~n item 20, and in item 22 show the p.~cJuci~.g interval, or .intervals,
top(s), bottom(s) and name (s) (if ~ny} for only the interv~! reported in item 30. S~bmit a separate report
(page) on this form, ~dequately identified, for each additional interval to be seperately produce~, show-
ing the ackJitional data pertinent to such interval.
It~2~: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing ~nd the location of the cementing tool.
Item 211: Submit ~ separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 ~nd 22 ~bove).
-q4. SUMMAI't¥ OF [,'OI:I. MATION TESTS IN(.'LUDIN(i INTERVAl.. TF,.STED. PI-1ESSURE DATA AND .RF_,CO'VE;~IF--.S OF OIL. GAS.
35. GI/X)LOG IC M A R KIi:I::L~
WATER AND MUD
,
N'AMI: .....
1. Liner Lap Test - 10,146' - 11,352'. Initial Hydrostatic 4,622 psi. .~,~^s.._ o~T~ ~.v.~".~-~ .......
Initial Flow - 756 psi; Final Flow 756 psi; Final Hydrostatic 4,622 psi.
B Mkr 595 8 ' 5663 '
2. Formation Test - Hemlock 10,195' - 11,552'. First Period - IFP 1515; C ~kr 4820' 4556'
FFP 1905; SIP 5121; Second Period - IFP 1921;'-FFP 5116; SIP 5254'. Rec 5000 ft
water cushion, 2492 ft rat hole mud, 1060 ft water.cut mud. D N~kr 5542' 4768,
E Mkr 7705' 6785 '
3. Formation Test - Hemlock 10,195' - 11,250'. First period IFP 1115; F Mkr 8812' 7615'
FFP 1285; SIP 3116. Second Period - IFP 1486 (Questionable); FFP 3152; G Mkr 10220' 8771'
SIP 3216. Rec 19 3/4 bbl water cushion, 17 bbl rat hole mud, 22.3 bbl
:.~ water ~ oil - grind out 9% basic sediment ~ water, less than 1 bbl free oil -.
................... . Top of Hemlock 11,025' 9479'
.... , -' i .-r~-
3fl. COIIE DATA, A'I~rACII BRIEF DEC~ZR~PITirON'S Ol~ [.ITflOLOGY. POR'O'S'ITY. F'HA~CT~R~'-~. Ali~~ ~i~'~
A~I) D~a'EdT~zt) m~OWS O~ Om. ~ On w~"~"'... BHL 11,352' 9,772'
.......
. . -, -,r, . . .,
.
,,
A+:lanticRichfieldC°mpany 'v'
Daily Well History-Final Report
...
Instruclion.~: Prepare and submit the "Ftftal Report" on tho first Wednesday alter allowable has been asslgnsd or well is Plugged, Abandoned. or Sold.
"Final Report" should be ~ubmitted also when ooerallons are susl~ended for an indefinite or appreciable length of time. On workovers when an official lest Is not
· required upon comoletion, re{x)rt completion and representalJve test data in blocks provided. The "Final Report" form may be used for report,ns the entire
...
·
operation-if space is available.
District
Field
SOUTH ALASKA ": '.'-
. .
HcArthur River Field.
Auth, ot W.O. no.
199281
. .
Counly or Palish
':" "~': ?',-- KENAI
L~'~se or Unit
. . .. ".
.... Trading Bay
.- Title
-,
.-.
.~-,,_. ::-.',. :...- ·
...
Ope!'ator . I A'R'cO' W.i.
Atlan~ie. Richf,iejid, Com~an_~'~:[ _ . . 0.129
Spudded or W.O. begun .. ..: -'.. Date
. ' 6,-lt~.Th
Date and depth ' . record for each day re
as of 8:00 a.m. '
I Accounting cost con/er code.
State
[ ALASKA
Well no.
otal number of wells (active or inactive) on this:
dst ~:enter prior to plugging and
I
bandonment of this well_ ,.,
Houf . .
9:~0 AM
8-22-Tk
11,439'
TD
Ki4- (Redrill)'---COOK INLET C7" csg @10,552') '
:.!1,439'TD, ll,llO.'PBD --Tested well 15 hfs on GL @avg rate 40 BOPH
::"i(960 BOPD) 055 ~ 4
:
·
~.. ~ ;1: :;r~ ' ';/.../...
:;: .~':-i'!-.::-'~2 -
:.~ -i :'-'.-4+'.; .... ':,'---:"'~c ' '::' -:;-'
.....,. _- ...::-' "' '::,::-::':i:-.'.-':: -- ....
:~_-..-:-.:-.;.~_. ..._.::':~.' ": . ..
.. -... ~ .-. .~. -... - . ..
· .... .
--:-~£'__ - ..-.-'7 ": ":-" ::" : . -: .: .
: --..! ::.',:,?:. "-- .
_ : ~-- -..2.;;:- · ,.. -'
- ......- . . . ---
Gravit¥_~ no wtr. RR @8'30 ~M 8/21/74." FINAL P~PORT+:'-:,,.
·
. .
Old TO
Released rig
·
· -!1772, .-..
New TO
Date .-
. .
11h39!
.
-
Classifications (oil, gas. etc.)- I Type completion (single, dual, etc.)
Oil ' i . Single
Producing method -' official reservoir name(s) -
Gas Lift Hemlock
.
Potential test data
; .
· .. . ':." - ':'.:~::~.:
.
·
· .
:
~. -...-. . -.. ...::~.:'-.'.-:
·
'2.'
..'- :1:
·
·
. .
Depth 1.1110 '
~ind 4f rig . Rotary
l'h is correct ' t . '
{~~ies86'and~, 't'' ''. ' , , - ~
Well no: Dat;~ Reservoir Producing Interval Oil or gas Test time 'ProduCtion
Oil on test Gas per day
. .' ..
. .
-.
K-~ 8-26,-74 Hemlock B-1 & B-2 Oil !P hr 565 .4'14
..
!Purpsize, SPM X length Choke size T.P. C.P. Water % GOR Gravity .Allowable- Effective date
corrected
. . .
,, N-/A .. ,' / N/A, 120 950 12.8 3_66 33..6 Market 8-__21-7 h
-.
..
...
A ~aB..459.,3.B
,
.
* " ' ° [Number all daffy well history forms consecutively
.':.,.:-. :-: · [
.-','..'i-.~.,.-.': .; :: .. ... _.!-. .-.:. .~,.,..,:~ a,.. p,,,~,~d ,o,.eac~ we,,. ,,: ·
- :.--:-/: :.i::. .-. - ,. ,- :,:-_ '.,. .... ..-- ,:...-
lPmge ~o.
/ tlanticRichfieldCompany
Daily Well History-Interim
lnslr~clJons: This form ;s used during drilling or wo;kover operalions, l( testing, coring, or perforaling, show formalion name in describing work performed.
Number all drill stem tests sequenhally. Attach cescnotion of all cores. Work performed by Producing Section will be reported on "Interim" sheets until llnal
completion. Report o.'hciai or represenlati,es :eSl on "Final" form. 1) Submit "lnlerlm" sheels when tilled out bul not less Irequently Ihan every 30 days, or {2}
On W~dnesday ol the week in wh,cn oil slnn9 is eel. Submit weekly for wor.~overe and following.selling ol oil siring unlil complelion,
District County or Parish
SOUTH ALASKA KENAI
Field Lease or Unit
HcArthur River' TBU
Date and depm Complete recorcl fo~' each da); while drilling or work@vet in progress
es of 8:00 a.m.
Ima'eALASKA
IWell no.
E-4
8-19-7~
11,~39 ' TD
8-20-7h
11,h3-9' TD-
8-21-?~,- -
11,.~39' TD
TBU K-4 Continued
Pumped 9 BW flush ahead ~ 2 BW flush behind cmt. CIP 84:30 PM 8/17/74.
PU to 11,110' ~ R@ XS cmt. RIH w/4 1/8" flat btm mill. Tagged top cmt
811,110'PBD. Displaced mus f/hole w/filtered sea wtr ~ ~isplaced wtr
w/$45 bbls 'DO. LD 2 $/8" DP ~ $ 1/2" DC.' '
TBU K-4 CRedrill) - COOK INLET {7" csg 810,552')
11,459'TD, ll,ll0'PBD -.Perf - Diesel Oil
Rn 527 its 5 1/2" 9.2.~ N-80 Butt tbg completion .assembly w/mile shoe guide
~ BOT shear sub 810,_1161: Otis X Nipple 810 128' (1 j t above shoe); BOT
7" x-$ 1/2" H-1 RSP Hyd Pkr ~1'- (2 jts above shoe), 8 Camco KBMG
GL. Ma Mandrels w/Bk Vlvs 810,--~S8', 9893" 9S18', 9082', 8215', 68SS',
4936', 244S', Camco TRB-6 Safety Vlv 8286. Landed full wt tbg on OCT
4 1/2" x-12" tbg hanger. ND BOP's. NU ~ test tree to SO00 psi. Circ
.tbg w/DO.' Pulled ball vlv. Set pkr w/2800 psi.
- .
TBU-K-4-(Redrill) - COOK INLET C7'.' csg 810,552')
ll,~59'TD, ll,ll0'PBD - Testing on GL.
NU ~ tested lubricator to 2600 psi. Unloaded well dn ~o 1st GLV 8244S'.
Schl perf'dunder drawdoWn donditions f/ll,02S - 11 05S' w/4 JSPF
w/2"-Stu~kone Hollow_Carrier. Rn North Star Static Press Sur to
11,02S' w/$086 psi BHP. Tested well e 1/2 hfs on GL 8rate of 120 BOPD
w/0.S% BS ~ W. Pumped 6S bbls DO into tbg ~ perf'd f/ll,071 --11,096'
..
·
The is correct
/~ preparation and
M an,.: al Section.'10,
..__~ng,. Pages P.6 ~
-~, 87
JOa~e - '
8/27/74
ITitle
So. Alaska Drilling Supervisor
AR3B-459-2-A
INumber all daily well history forms conseculively
as they are prepared for each woll.
IPage no. 8
AtlanticRichfieldCompany
Daily Well History-lnterirn
lnslructionat This ;rrm is used during drilling or workover operalions. If testing, coring, or perforating, show ~ormalion name in describinq work performed.
Number a;I 'drill stem tests se<iuenlially. Attach description of all cores. Work performed by Producing Section will be reporlsd on "Interim" sheel~ unlil final
completio.. Reoo,10;hcial or representalive tesl on "Final" form. 1) Submit "ILl@rim" sheets when filled out but not less Irequently than every 30 days, Or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workover$ and following setting of oil string until completion.
District
SOUTH ALASKA DISTRICT
Field
McArthur River
Date and ~eptn
as of 8;00 a.m.
8-12-7~
11,~39 ' TD
..
8-13-7~
11,~39' .TD
County or Parish I Stale
KENAI I ALASKA
Lease or Unit IWell no.
Trading Bay Unit _ , I K-4
8-15-7~
-- 11,439' TD
Complete record for each day while ~lrilling or workover in progress
' '8-16-Th
11,439 ' TD
..
8-19-7h
11,L.'39' TD
TJ~-~-a~o-~e is correct /
/'='~r forr/-'~'~. Parat.;on and dist-_,ioutio~
/see P~ced.'res Manual Sec:ion 10.
~Q~tll'ng, Pages 86 and 87 '
Continued ' "
Bumped plug w/2000 psi. CIP @7:30 AM 8/11/74. PU out of liner. DP
pulled' dry-~' POH. Tested BOPE w/S000 psi & Hydril w/1800 psi. RIH w/6"
bit. WOC total 1S .hfs; Tagged top of cmt @10,1S0' & DO S9' of firm cmt .'
to' top of liner' @10,.209r... Circ 5 coLd mud. Tested lap w/2000 psi for
.iS miL, OK. POH. PU 2 5/8" DP.
.TBU K-4 (Redrill) - COOK INLET (7" .csg @10,SS2')
il,459'TD', ll,SS2'PBD - Trip in for W.S.O. Test - MW 10.0#, Vis 48
Finished trip in w/4 1/8" bit on 2 3/8" ~ $ 1/2" DP. Drld cmt
11,296 - 11,~S2'. Circ-clean ~ MOH. R~ GR-CBL 11,~06 - 10,100'.
Good bond throughout,
· .
-TBU K-4 (Redrill) - COOK INL~-T (7" csg @10,552') '-
11,459'TD, ll,$52'PBD - DST -MW 10#, Vis 48
Rn-WSO. Set tool @10,159'~ 2000'. W:/C. Dead in 1 min. Recovered WC
~ 20' of-drig mud. Rerun CBL. Perf 4 SPF 10,255 - 10,265' DIL.
Rn DST #2 ~ set pkr 810,195'. Tail @10,206'. Initial Flow 10 min.
Initial Shut in 50 min.
TBU K-4 (Redrill) - COOK INLET [7" csg 810,S52') .'
11,439'TD, ll,5S2'PBD - Cric - ~V 10.0#, Vis 41
Tool open 9 hrs. Light steady blow to surface. No fluid. Final
~Shut.in 5' hrs"25-'min':'-Recov.ered 5000' W.C., 2492'. Rathole mud,. 1060'
watercut mud. IF 1945 psi, ISiP 5156 psi, IF 1965 psi, FF 5136 psi,
FSIP 5264 psi. Rn EZ rtnr on WL. STopped @10,950'. CO bridges @11,211'
- 11,222' & 11,281' - 11,292'.
. .
. .
TBU K-4 (Redrill) - COOK INLET (7" csg 810,552')
11,459'TD., ll,250'PBD - GIH for DST - ~'~N 10#, Vis 42
Circ ~ cold mud @11,552-'. POH. Set Howco EZ-SV rtnr @11,250' on DA's
WL.. SIH w/2 sx cmt in DA's Dump Bailer to spot on top of rtnr. Hit
top.of liner ~.dumped cmt. RIH w/bit. Washed thru top of liner ~
circ out on top of rtnr @11,250'. POH. DA perf'd f/ll,170 - 11,180' w/
4 Jumbo JSPF w/5 1/2" csg gun. PU Howco 7" DST tools w/5000' wtr
cushion ~ SIM.
...
TBU K-4 (Redrill) - COOK INLET (7" csg @10,552')
11,459'TD, ll,ll0'PBD - RIH w/5 1/2" completion assembly - MW Diesel
kn DST #2 w/pkr set 810,195: ~ tail @10,206'. Tested perfs f/ll,170 -
11,180'. Took 10 mil IF 7 50 mil ISI. Reopened tool 87'55 ;uM for 8 3/4
hr flow period. Took 2 hr FSI. RO 19 5/4 bbls wtr cushion, 17 bbls rat
hole mud ~ 22.5 bbls F.%:rrN wtr. w/10% oil (less than 1 bbl free oil).
LD DST tools. Made dummy run w/bailer on WL. Tools stopped @11,060'.
RIH w/4 1/8" bit. CO contaminated mud to 11,250'. Circ& cond mud.
Set 5" EZ-SY rtnr 811,160'. Tested csg ~ rtnr w/2000 psi. Spotted
.15_ sx C1 G cmt pluf w/l% CFR-2 § 0.2~ HR-7 m~xed .@15.8. ppg on top of .rtnr.
ITitle
So. Alaska District Drilling Supervisor
AR3Bo459-2-A
INumber all daily well h,~tory forms conssculively
as they are prepared for each well.
'i Pa(jo no,
AtlanticRichfieldCompany
Daily Well History-interim
Inslrucliona: This form is used during drilling or workover operations. If testing. Coring. or perforating, show formal~on name in describinq work performed.
Number all d,II stem tests sequentially. A/tach description el all cores. Work performed by Producing Section will be reported on "Interim" sheels unlil final
completion. Report ollicial or representative test on "Final" form. 11 Submit "lnlerim" sheels when filled out but not less frequently than every 30 oa),s, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting o! oil string until completion.
District
Field
Date and cleptn -
as o! 8:00 a.m.
.... ' ..... JCounty or Par[~sh
SOUTH ALASKA DISTRICT I KENAI
Lease or Unit
TP~DING BAY
~lete record for each day while drilling or worl(over in progress
IStale
ALASKA
JWell no.
K-4
8-5-'7~
11.,772' TD
..
11,~72' TD
TBU K-4 (Redrii1) - COOK INLET (7" csg @10,552')
11,295' (146') - Drlg w/Dia - MW 10#, Vis 52, WL 4.2
Drld 6"-Dir Hole f/11,147 - 11,295~. Tested BOPE. Rmd to btm on
:-bit %'rips @11,157' ~ 11,291'. Hole cond good.
Sur: 11,157' 26 5/40 SlSW; 1t,270' 28 1/4° S16W
-TBU K-4 (Redrill) - COOK'INLET (7" csg @10,552') "
11,349' C56') - RIH - ~Sf 10#, Vis 52, WL 4.5
Drt. 4--6" dir hole w/dia bit f/11,295 - 1'1.~549'. Made Wiper trip 811,528'
w/hole in good cond. Pulled'up into csg for Wiper Trip 811,549'. Worked
pipe Several times'thru light spot 810,922'. No drag thru interval
after'first time thru. -'
8-7'-7~ '
11, ~72' TD
o.
828-7h
11,:772" 'TI)
-.
.TBU K-4. {Redrill) - COOK INLET (7" csg 0_'10,552')
1'1~$98' (49') - Drlg - ~N 10#,. Vis 52
. Drld '6" Dir hole w/dia bit f/11,349 - 11,598'. Made wiper trips "
811,582' ~'11,589'. Spot rmd f/10,895 - 10,950' thru previously
reported. tight spot '@10,922'. No evidence of tight spot. Hole cond
good. - ...
.
.
TBU K-4' (Redrill) - cook INLET (7" csg @10,552')
.11,414' {16') - Drlg - ~f~ 10#, Vis S0, WL 4.6
_Drld 6" dir hole w/dia bit to 11,401'. POH. Bit 80% worn, 1/2" out
of-guage. RIH w/Dia Bit ~ Rmd underguage hole f/11,$87 - 11,401'.
.Drld f/ll,401 - 11,414'.
Survey- 11,381' 28~ S17W
. .
-.
8~9-7k 'TBU. K-'4 CRedrill) - COOK-INLET (7" csg @10,552')
11,k39~ TD 11,459' (25') - POH to log - MW 10..1#, Vis 51, WL 4.5
'- Drld-6" Dir Hole w/dia bit f/ll,~14-- 11,439'. Made wiper trips
811,419' ~ 11,459'. Pulled' to 35,000# ~ worked thru tight spot
.. @10,957' on trip f/ll,.~S9'. Rmd out tight spot f/10,957 - 10,977'.
Circ ~ cond hole for log.' SOH to log. Hole cond good on trip out.
. .
· .
8_12_7~ TBU K-4 (Redril!) - COOK INLET (7" csg @10,552')
11,~39-' TD 11,459'TD, {0) - RIH w/4 1/8" bit - ~Sf 10.3#, Vis 50
.. -Rn DIL ~ GR/Sonic Logs f/Schl TD 11,420' to window @10,552'. RIH w/bit.
Rmd 195' to btm. Circ ~ 'cond hole for liner. Made wiper-trip. Circ
btms up. Spotted 58' vis fresh gel pill in open hole. POH for liner.
.Hole cond good on.trips. Rn 29 its {1210') 18# N-80 Hydril FJ Liner
w/BOT hydraulic MC liner hanger w/type long sleeve (6') tie back assembly
' w/o flapper or packing rubber. Rn 22 B & W very restricted clearance
centralizers on each.jr f/11,459 - 10,510'. Top of liner @10,209~~
w/545' lap. B0T float shoe 811,459' w/landing collar ~ catcher sub
811,552'. Circ btms up. Set liner hgt. Pumped 5 BFW ahead ~ cmtd liner
w/ll0 sx C1 G cml w/l% CFR-2 ~ 0.2% HR 7 mixed ~15.8 ppg. Cmtd w/50%
· [ XS over calipered hole vol.
is corr t
...... /,/',,?- I°,,: I . '
_~'~/f.~K~~~_~ __ [ 8/27/74 l So. Alaska District Drilling Superviso~
/or for~'l~,epara.ion and-distribuli°r~ . ' '
(see Pj, dcedures Manual Section 10,
'Dg, F,,fhg, Pages 86 and 87 '
Displaced w/2 BFW & 92 BI0# mud, w/full returns.
AR3B-459-2-A
Number all daily well I~islory I~rms consecul~vely
as they are prepared for each well.
lP3ge no.
AtlanticRichfieidCompany
Jaily Well History-lnterirn
Instructions: This f3rm ~s used durino drilling Or ',,Orkover ODeratIons. If test,hq, coring, or porforaling, sh(~w to?mai,on name in de~cribin.q work performed.
Number a;I drill stem :-.sts .seauentially. A{tach descriDtmOn of all cores Work performed by. Producing SeCtion will be reporled on "interim" sheelS until final
comple6on. Reoort official or represenialive ,esl on "Final" form. 1} Submit "'Inlet,re'" sheets when filled out but not less frequently than every 30 days, or
on Wednes~tay of the week in which oil string is set. S[,bm~t weekly lot workovers and following selting o! oil string until completion.
·
.. .
District
SOUTH AL.ASK& DISTRICT
Field
County or Parish ' IStaie
KBNAI I ALASKA
Lease or Unit
TRADING BAY
Date and depin
as of 8:00 a.m.
Complete ~cord for each day while drilling or workover in progress
7-24-74
11.'772' TD
·
.
7'25-7
11,772
7-28-74-
11,772" TD
.
7L29_7'4~
11.772, TD'
..
7L30.74
11.772'~-TD
.
.
7'3127~
11,772' TD
'8-1'74
11 ~'T2Iy TD
8-2-74 '
11.772 '~' TD
TBU K-4 (Redrill) - COOK INLET -(7" @10,552')
l_0,60h' (38!_)--Drlg'~ 1066~' - MW 9.9#, Vis h8, WL h.6
POH w/bit ~ DD @10,'6~4'. RIH w/6" bit 5 reamer. Reamed f/10,560-'
10,654'. Drld 6" Dir hole f/10,654-10,664'.
TBU K-~ (Red_rill) - COOK INLET - (7" csg ~10,552' )
:
Drlg ~10,731' - MW 9.8#, Vis 52, WL 4.4 '
POH w/DD & diamond bit ~10,683'. WIH w/6" bit. Reamed f/10560 - 10,683'.
Drld 6" hole f/10,683-10731'.
TBU K-'4 (Redrill) -. COOK INLET (7': csg 010,552')
10,779' (48') - POH w/6" Diamond bit - MW 10.0#, Vis SO, WL 4.5
Drld to 10,768'. Made Wiper' trip. Reamed f/10,758 - 10,768'. '
Drld to 10,779t.
-.
- ,,
TBU K-4 (Redrill). - COOK INLET (7" cs# @10,-52')
_
10,916'TD (137') -bflN 10#, Vii 50, WL 4.8
POH w/diamond bit. Picked Up HWDP. Test BOP ~ Hydril w/S000 psi.
Reamed f/10,560 - 10,779' Drld f/10,779 - 10,856'. POH w/bit.
WIH w/6" bit'. -Reamed f/16,680 - 10,856'. Drld 6" hole f/10,856 -
10,869'. POH w/bit. WIH w/diamond bit. Reamed f/10,562 - 10,869'.
Drld 10,869 - 10,916'. Made wiper trip 810,905'.
SurVey- 10,849' 28° S 20 W; 10,816' 28° S20 W - -
TBU K-4. (Redrill) - COOK INLET (7" csg @10,552')
11,006' (90') - Drlg - MW' 10#, Vis 52, WL 4.4 "
Drld 6" 9ir Hole w/diamond bit f/10,916 - 11,006', Made wiper trip @10,98'8'
· after 12 hfs drlg hole cond good.
. .
..
TBU K-4 (Redrill) -.COOK INLET (7" csg @10',552')
·
11,088! (82') - Drlg - 55~ 10#, Vis S1, WL 4.5 ...
Drld 6"-Dir Hole w/dia bit f/ll,006 - 11,088'. Made wiper trip
"@11,049' after 12 hfs drl~. Hole cond good.
TBU K-4 (Redrill) - COOK INLET (7" csg @10,552')
11,120' (52') - Trip - ~fl0#, Vis S1, WL 4.S
'POH w/dia bit @11,088'. Wtr courses washed out. RIH w/Mill Tooth Bit
5 drld 6" Dir Hole f/11,088 - 11,120'. Hole cond good on trips.
Survey: 11,068' 28° S 18 W
.
TBU K-4 {Redr.ill) ~ COOK INLET (7" csg @10,SS2')
11~147' (27') - Drlg - FEY 10.1#, Vis S2, WL 4.6
Drld 6" Dir Hole f/ll,120 - 11,147'. Trip for bit @11,140'. Hole cond
good..
.
Sur' 11,120' 26 5/4° S16W
The above is correct ' /
~ ~~~,~.Smgnature. .
;46~r fo~"~'~, repatation-~nd ~f~-'.ributio~ ·
[.s_e:.e.J~rocedures Manual Section 10, - -
DTilling, Pages 86- and 87 '
Date
8/27/74
ITitle
So. Alaska District Drilling Supervisor
AR3B-459-2-A
INumber all da,ly well hislory forms Consecutively
as they are prepared lot each well.
JDa.3e nc~
AtlanticRichfieldCompany
Daily Well History-Interim
lnstructionl: This form -'S used during drilling or wo~kover OOer3tmonS. If testing, coring, or perloralin§, show formation n,lme in de.~cribing work performed.
.Number all drill stem ;a_s~s ~ecuentially. At;aCh desCriplioft Of all cores. Work performed by Producing Section will be reported on '"lnlerim" sheets until final
completion. Report o~::c,am .~r represenlative test on "Final" form. 1) Su0mit '*Interim" she@Is when tilled out but not less Irequenlly than every 30 days, Or [2)
on Wednesday of the -e~< in which oil string ms set. Subm:{ weekly for workovers and following· salting of oil st.ng until completmon.
District
SOUTH Af-'&S~& DISTRICT
Field
Date and deom "
ss of 8:00 a.m.
-'7_12_7'1~
11,772' TD
·.
?-15-?~,
11,772' TD
7-16-74
11,772' TD
.
'7-17'7~
11,77~2.' TD
..
7-18-7H
11,772:. TD
7't9-7~ ':
11,772' TD'
7'2_2.-7 ~
it,772' TD
7-23-71~
11,.7~2' TD
ICounty or Parish
KENAI
IL@asa or Unit .
, Trading Bay Unit
Jsta'iLASKA
'Complete record for each day while drilling o~ workover in progress
..
TBU K-4 (Redrill) - COOK INLET) (7. @10~SS2')
10,613'(39') - Kick off w/DP - bB~ 10.0#, Vis 49, WL 5.2
~¥0C 24 hrs. Top cmt @10,568. Drld to 10,574'. Test Plug. OK.
TBU K-4 (Redrill) - COOK INLET - (7" @10,552')
10,748' (135') - Trip - bB~ 10.0#, Vis 53, WL 4.9
Had@ 2 DD rns from KOP @10,S74'. WIH w/drlg assembly & dulled bit.
POH @10,748'.
Sur: Bit MD 10,748', TVD 923S', 21° S8~
TBU K-4 (Redrill) - COOK INLET - ~7" @10,552')
10,794' (46') - Drlg - ~5f 10.1#, Vis Si, WL 4.9
Trip 610,772'. Rmd 10,S90-10,772'.
· .
TBU Ki4 (Redrili) - COOK INLET - .(7" 810,SS2')
10,8S0' (S6') - ~ 10.0#, Vis 48,-WL 4.9, Trip @10,850'.
TBU K-4 (Redrill) - COOK INLET - (7" @i0,SS2')
10,8S8' (8') - Fishing - 5~ 10.0#, Vis 49, WL S.0
Tested·BOPE w/S,000 psi OK. Twisted off 4 3/4 DC pin'@10,648' while
drlg. 209.50' fish in hole. Going in hole w/ S 5/4" Bowen overshot,
Bumper sub, Oil Jars, 9 4 5/4" DC.
TBU-K-4 (Redrill) - COOK INLET- (7" @10,552') ' '
10,858' (0) - RU Dia-Log - 5B? 10#., Vis 49, %VL 5.2
Jarred on fish 17 5/4 hrs. to 500,000#. Spotted 5 bbls Lubri ](lean
-w/10 bbls mud. Spot 5 bbls outside fish and moved 1 bbl every hr.
Corrected fishing assembly - 5 5/4." OD overshot - XO Sub - Bumper Sub-
Oil Jars - 6, 4 5/4" DC = 529.71.
..
TBU K-4 (Redrill) - COOK INLET - (7" @10,552")
10,570' (8') - Drlg @10,570' - MW 9.8#, Vis 48, WL 5
Pun free point. Rn.string shot. Backed off 1 DC. Fish left in hole
180.00' top of fish '@10,678'-. POH. RIH w/tbg tail on-DP. Spotted
'102 sx Class "G" cmt w/0.2% HR-7 ~ 1% CFR-2 f/10,678-10,506'.
RO cmt 610,506'. POH. WIH w/6" bit. Drld cmt f/10,306-10,562'.
Tested plug w/25,000# wt ~ 2500 psi pump press. POH. RIH w/6" bit
~ DD. Drld 6" Dir Hole f/i0,562'-10.,570'.
TBu K-4 (Redrill) -'COOK INLET - (7" 810,552')
10,626'TD (S6') - Drlg - MI.~ 9.9#, Vis 49, WL 4.S
Drlg @10,626' w/DD ~ 6" bit.
The above iS curT@c-: 7 '
" ' ' * ' 'i 'Date
rifle '
So. Alaska District Drilling Supervisor
Drilling, Pa6as 85 and 87
8/27/74
AR3B '-45~2-A
.-.
iNumber' all daily well his!cry forms consecutively
as, they J~re propared for each well.
[i~ no.
't
AtlanticRichfieldCompany
Daily Wel] History-Interim
instructions: This form is used during d~;illing or Clerk@var' @0era,ch3. Il' testing, coring, or perforating, show formalio, name in (I.3$cribinq work performed.
Hurnbew all drill stem tests sequentially. Attach description el all COres. Work performed by Producing Section will be lap@fled on "Interim" sheets until linal
completion. Report olhc~al or representative test on "Final" form. 1) Submit "Interim" 5he~ls when Idled out bul not less frequenlly than every 30 days, or (2)
on Wednesday el Ihe ,~eek in which oil string is set. Submit weekly for work@vets and following setting of oil siring unlil complelion.
.
District -
Field
SOUTH ALASKA DISTRICT
(jo'~r~'ty or Parish Istate
KENAI [ ALASKA
Lease or Unit
Trading Bay Unit
JWell no,
K-4
Date and depth
as of 8:00 a.m.
,Complete record for each aa,/' while drilling or work@var in progress
7-2.-71.
11.,772 ' 'I'D.
723_71. -
11,77.2 ' TD
. ·
7--5-7~
11_,772.' TD
7-8-T4~-
11,7.72 ' TD
7-9-7.4-
11,772' TD .
7-10-71.
11,772' TD
T_ll.~7 [~ -
11,772' TD
K-4 (Redrill) - COOK INLET (7" @10,552')
11,077'C61') - Drlg - MW 919#, Vis 51, WL 4.8
Drld 6" Dir Hole f/11,016-11,077'.
Survey:. 1102S MD 9477'TVD 29 5/4° S17E
TBU K-4' CRedrill) - COOK INLET C7'" @10,552')
11,'142'[65') - Drl~ - blW 9.9#, Vis S1, WL 5.0
Drld 6" Dir Hole f/11,077 - 11,142.'.
Survey: ll,09$'MD 9556'TVD $0 1/4~ S16B
K-4 (Redrill) - COOK INLET .(7'.! @1'0,S52')
11260' {118') - Drlg -.' 'MW'10.0#, Vis SO, WL S.0
Trip at 11,180, for Bit #13
Survey: ll,161'MD, 9S94'TVD, 51° S17B
TBu K-4 CRBdrill) - COOK INLET - C7" '@10,SS2')
11286' C26') Fishing - NBf 10.1#, Vis S2, NL 4.8
WIH w/bit #12 RR. Hit bridge at 11188'. Stuck DP. Worked pipe 9 hrs.
Ran free point. DOJ partially free at 10760'. OBit at 11188'), Top
DC at 10640': Worked 3 hrs. DOJ not working. BO ~ POH recovered 1 st
stabilizer and'l DC . WIH w/fishing assembly ~ screwed into fish
(S1S.70') of fish. Jarred 5 hrs. Ran free point. Attempted BO
@ btm of DOJ. Left fish plus sub, bumper sub and cross-over in hole.
'Top fish @106'62' ._ Preparing to screw into fish.
TBU K-4 (Redrill) - COOK INLET (7" @10,552')
-11286'. C0) - Fishing - MW 10.0#, Vis 46, WL 4.8
Jarred and bump fish for 7 hfs with max pull 308,000 #. Rn F. PI.
DP free at 10,672' Cscrew in sub). Set 8S,000# wt on fish and circ
6 hrs. Ran FPI at midnight.' DP free at 10,672' as above. Dialog
free point reading at intervals dn thru the fish indicated some movement.
.
·
...
TBU K-4 CRedrill) - COOK iNLET (7" @10,SS2')
11286' (0) ~ Prep to spot cmt plug - MW 10.1#, Vis S2, WL 4.7
Set 7S,000# Wt on fish and circ with cripped pump 6 hrs. Attempted
back@frs at 11,190' 10,75S'. Backed off at 10,672' at screw in sub.
.-Circ HOH. Fish left in hole = S16'.
TBU'K-4 (Redrill) - COOK INLET C7" '010,552')
11286' C0), 10,428'PBD - WOC ~ ~%-~ 10.1#, Vis 51, WL 5.0
Spotted 70 sx cml 1% CFR-2, .2% HR-7, 10,672-10,428'. RO 5 sx 810428'.'
Job complete 810:15 AH 7-10-74. WOC. POH. Tested BOPE w/2500 psi. OK.
Go in hole to 10,200' and circ.
¥e i$ correct
j~:or fornJr'~ara:ion and distribution'
[see Prffcedures Maaual Section 10,
-N~ill~g, Pages ~5 and 87
AR3B-459-2-A } .- ..:
.
-. .~
· .~
[~ates/27 / 7 4
Alaska District Drilling Supervisor
...
I ~lumber all daily well history [3tins consecutively
as lhey-are prepared Ior uach well.
· ., . ~ .
no.
·
AtlanticRichfieldCompany
DailY Well History-Interim
InMructions: This .*or~ :S [,sed curing drilling or wor~o~er operabo-s. If testing, coring, or peHorating, show formation name in describinq work performed.
Number ali d6il stem tests sequentially. Attach descriprio, of ail cores. Work performed by Producing Section will be reported on "lnlerim" sheets until final
completion. Reoort off:cl~i or representative lest on "Finai" form. 1) Submit "Interim" sheets when filled out but not less frequently then every 30 days, or
on Wednesday o! the wee~ in which oil string is set. Submit weet(ly for workover~ and following setting of oil string unlil completion.
_ .
District County or Parish
SOUTH AL~Si~ DISTRICT KENAI
Field Lease or Unit
Trading Bay. Unit
Date and Oepm Complete record .'o~:'each day wrtile drilling or workover in progress
as of 8:C0 a.m.
Stale
ALASKA
JWell no.
11,7T2' TD
6-25-7~
11,772' TD
_
o.
6-26.74
11~772' TD
6~27-7~
11,772 ' TD
6-28-7H
1i, 772 ' TD
7-~1-T4
11,772 ' TD
·
TBU K-4 CRedrill) - COOK INLET C9 S/8" 810SS2')
10,619'(6S') - Drlg w/DD #1 -'~V 9.8#, Vis SO, WL S.2
POH w/mill. RIM w/12 its 5 1/2" Butt tbg on 5 1/2" DP to 10,608'.
(Top.of 9 .S/8" stub 810,60S'). Pmpd 20 bbls caustic preflush mixed
w/10# caustic per bbls wtr. followed w/S BW. Spotted 60 sx densified
.
.(16.8-17.$ ppg) G cmt plug w/l% CFR-2 f/10,608'. Displaced w/6 BW
~ 68 BM. CIP 82:21 pm 6/21/74. PU to 10,391' & RO 6 bbls cmt& caustic
wtr. POH. 'Tested BOPE. RIH w/6F bit to top of cmt 810,398'. Plugged.
bit. 'POH. -Found-2' plug of steel mill cuttings on top of bit. DP
badly magnatized. Reran bit & broke Circ every 40 stds. WOC total
of 21 hrs. DO firm to hard cmt f/10,$98' - 10,SS4' in 7 hrs. (top
of window @10,SS2'). Circ& cond mud. POH. RIH w/6" diamond bit
~ DD #1. -Oriented DD w/ Sperry Sun (SS) steering tool. Sidetracked
old hole ~ drld 6" hole f/KOP 10,554'-10,619'.
-.
TBU K-4 (Redrill)'- .C00K INLET (9 5/8" @110552')
10,710' {91') Drlg - ~ 9.8#, 'Vis 48, WL 4.5
Drld w/6" diamond bit ~ DD #1 .f/10619' - 10,648'. Tripped for BHA.
Drld to 10,710'.
Surveys: 10628' 29° SSE; i0668' 27° S16E
-TBU K-4 (Redrill) - COOK INLET (9 5/8" @i10552')
i0,7S4' (44') - Drlg - MW 9.9#, Vis 55, WL 4.2
Drlg 6" Dir Hole f/10,710'-10,754' in 8 1/2 hrs.
Tripped for Bit 810,718! ~ 10,749'.
Surveys: i0,628'MD 9127'TVD 28~ SSE; -10,708'MD 9199'TVD 26 1/2~ S145
10,759'MD 9226'TVD 27~ S14E
TBU K-4 (Redrill) - COOK INLET (7" 810,552')
10,808' ($4') - Drlg - ~B~ 9.8#, Vis 51, WL 4.0
Drld 6" Dir Hole f/10,754-10,804', w/Journal Beari. ng Bit. POH.
RIH w/6" diamond ~ drld to 10,808'.. .:
Survey: 10,794'MD 9275'TVD 28? S16B
TBU K-4 (Re&rill) - COOK INLET (7" @10,552')
10,866' (56') - Drlg - HW 9.9#, Vis SO, WL 4.1
Drld 6" Dir Hole-f/10,808'-10,866' w/Diamond bit. blade wiper trip
into csg after 11 hfs on btm.
-. TBU K-4 (Redrill) - COOK INLET (7'~ csg' @10,552')
11,016"(1S0') - Drlg - MW 9.8#, Vis SO, WL 4.8
Drld 6" Dir Hole f/10,866-10,879' w/diamond bit. Trippedfor mill
tooth bit. Rind tight hole f/10,817-10,877' following Diamond. Drld to
11,016' w/bit trips.810,900',10,936',.11,002'. Tested BOPE w/2000 psi.
Hole cond. good.
Surveys: 10,860'MD 9333'TVD 28° S15E; 10,917'MD 9383'TVD 29° S17E;
10,983'MD 9441'TVD 29 3/4° SI6B
Date
8/27/74
Title
So. Alaska District Drilling Supervisor
AR3 B-459..2.A
Number all daily well hislory forms conseculively
its Ihey ara prepared lot each well.
jPag; no.
Daily Well History-Initial Report
/ tla nticRichfieldCom partY
Inslructiona: Prepare and submit the "Initial Report" on the first Wedr'esdsy after a wall is spudded or workover operations are started.
Daily wort< prior to spudding shOuld be summarized on the form giving inclusive dates only.
District
SOUTH ALASKA
Field
Auth. or W.O. no.
..
Coumy or Parish
KENAI.
Lease or Unit
:Tradin_; Bay Unit '
Title
.'.
Iitats
ALASKA
lWoll no.
K-4
Operator
ATLANTIC RICHFIELD CObIPANY
Spudded or W.O. begun
Date and. depth
as of 8:00 a.m.
11772 ' TD
-6_17_"(1,
-' 11772'TD
-6-18-71t
11772 ' TD'"
6-19'-74
11,772 'TD
6-20-714
11'772 ~-TD
6-21-74
11772 'TD
,rate 6/14/74 '
Complete record for each day reported
..
T~ve is correct
..~5</~~~ ~(2_~9~..(~~ 8/27/74
)~or"Rr~pre:ara::cr~ and di~Hbutio;3- - '~
Pracacur~a ~a~,.~, Section 10,
Pages ~6 ~nc ~7. r
tour 9' 30 J~
I.A.R:Co's W.I.
I~rior status i! a W.O. .. ~
TBU-K4 CRedrill) - COOK INLET (7" csg @11770').
11772'TD, lllTO'PBD - Moving Rig f/K-19.
TBU K-4-[Redrill) - COOK INLET {7" csg @11770')
11772.'TD, lllT0'PBD - PU$ 1/2" DP - H~ 9.7#, Vis 40, WL 6.2
- Pulled BV ~ GLV @10896'. Killed well w/ST0 bbls 9.5 ppg mud. Completed
' rig move @9:30 AH 6-14-74. RU. Circ ~ cond mud thru GLV @10896'.
Bled' 800# gas press off 9 S/8" x ?" annulus. Installed BPV. ND tree
.- ~i NU BOPE. RU complete @12 MN 6-15-74. Tested 3 1/2" rams to 1S00 psi
.-- ~ hydril to 1000 psi. PU tbg § pulled pkr loose w/Il2,000# (same as
wt of tbg, indications are that pkr was not set). POH w/5 1/2"
completion assembly. Tested BOPB w/2500 psi ~ Hydril w/2000 psi.
SIH w/6':-bit,, junk basket, 4 5/4". DC's ~ 5 1/2" DP.
·
TBU K-4 {Red~ill) -. COOK INLET {7" csg @11770')
11772'TD, 10695'PBD -Circ ~ CoLd mud - MW 9.7#, Vis 42
- FIH w/6" bit ~ d 1/2" DP. Tagged fill @11148' .. Circ 35 bbls 9.4 ppg
' rat hole mud off btm. CO to 11500' PBD. No indication of GO thr. ough-
tbg bri'dge plug or cmt 011170-11194'.' Circ ~ coLd mud. MOH.. RIH w/757' '
$ 1/2" butt tbg stinger on 5 1/2" DP to 11295'. Spotted 125 sx (600'+_)
cl G Cmt plug w/l% CFR-2 ~ HR-7 mixed 015.8 ppg across open Hemlock
perfs f/11297-11032'. CIP 85-25 PJ~I 6-18-74. PU to 10690' [ R@ 2 bbls
.-.'- cmt contaminated mud. Est. top cmt @10695'. PU to 10660' to circ '~i
Cond-mud.- ..
-.
TBU K-4 (Redrill) ' COOK INLET (7" csg.@l1770')
11,772'TD, 10,742'PBD - Milling Window in ?" csg -. ~IW 9.9#, Vis ?1
-. : Circ B tend.mud' after spotting cmt plug. MOH. -RIH w/Servco 7" x
S 1/2" section mill.. Rubbered DP. Tagged top cmt plug @10,742'. PU
to 10,552'. Mill 15' window in 7" csg f/10,552'-10,565' in 6 hrs.
Milled up collar 810,56'4'.
TBU K-4 [Redrill) - COOK INLET {7" csg @11770')
11772'TD, 10742'PBD -Circ- HW 9.9#, Vis 125
Milled 25' section in 7" csg f/10565'-10588'. Mill 'cuttings birdnested
· ~ started packing off. .Attempted to pull up into csg' @press incr to
3000 psi ~ mud loss to froth. Circ R worked pipe 5 hrs. POH w/mill.
RIH w/6" bit to CO mill cuttings.
TBU K-4 (Redrill) - COOK INLET (7:' csg @11770')
llT?2'TD, 10742'PBD - Tripping - 55~ 9.9#, Vis 125
Circ ~ worked bit 4 hfs f/10550'-10591' to CO mill cuttings. RIH to bridge
810611'. POH. RIH w/Servco 7" x 5 1/2" K section mill ~2. Milled 17'
section in 7" csg f/10588-10605' in 9 hrs. Cut total 55' window f/10552-
10605' in 27 hrs. Circ out mill cuttings. SOH w/mill.
.
' I Title
So. Alaska Drilling Supervisor
'%R3B-459-1-;~
[Numbei' all dally well hislory forms conseculively I P'lg~"°'
they are prepared lot each well. ·
JOB NoA-6-6-74 ,
DATE 8-29-74
REPORT
and
PLAN
of
SUB-SURFACE
SURVEY
T.B.U. K-4 (Redrill)
~',~ ~m~ ~ ..,, ~ ~' '~ ..
ii i , I ii i
I I , I I , Il I ' I i i il .....
tNPLETION REPORT AUGUST 27t1974 ...........................................................................................................................
'LANTIC RICHFIELD CO, TRADING BAY UNIT
!LLY BUSHING ELEV, 100 FT DECLINATION 24 DEGREES ........... = .....................
~NGENTIAL NETHOD OF COHPUTATION
[EPARED FOR ADDCO BY F, H, LXNDSEY AND ASSOC, ....................
· RECORD OF SURVEY
· -* "ALL CALCULATIONS PERFORMED BY ! B N ELECTRONIC' CONPUTER ..................... ~'~ ......................
.............. TRUE ........................................... ·
"'AS,-DRIFT VERTICAL -'SUB DRIFT "TOTAL"COORDINATES ........... C L 0 S U R E S *'SEVERITY SECTION
[PTH .ANGLE DEPTH "'SEA DIREC .........................................DISTANCE ANGLE DEG/IOOFT DISTANC
~)852 29 ,45 .... 9061"00 ..... 8961,00. $ 2 4852,00 S ..... 941i00'-'E "
06.8~ '26 ~0" 91'78,,29 9078;2!~ S IIi W ' '4908,46 S'' '925e87 E '"4995,01 S 10 40 55 E "' 6~576 ......... 4992~86
081.6.28""..0 .*'~929~,66 '9~195,66 S 20 W '-'4967.,13 S ...... ..90`4,51 'E'- 5048,81'S 10 19.13 E .... .2?057 ............. ,~047,47
0849 28 0 .'-',9!~24,80 "9224,80 $ .20 W ...... 4981,69 S '" .899.,2.1 E ':$062.,,19 S 10 13 5.~ E 0,000 ........ .5061'o02
1068 28 .0 '91~18~17 9418,17 S 18 ~ 5079,47 S '" 86?,44 E'''51'51~,0! S 9 41 28 E 0e429 ........... ~152,6~
11'20 26145 ..... 9564e60'-9464,'60 S 16 W DlOle9? $" 860"99'E
1137 26 45 9579~78 9479,'/8 S 18 W 5.109,25 S ........ 858,62IE ..... 5180,89 S 9 32 22 E '-5,295 ....... ~180"66'
12770 28 15 '96.96,94 9596,94 $ 16 W '5169,76 S "'841,27 E 5237,7.6 S 9 14 ~3 E" 1,324 .... ~237,71"
OTTOH HOLE'CLOSURE -528'4*55 FEET AT'S .... 8' 59 34 E ................................................................
.
...
.... , ..................................... . ................... .- .............. ,-... .......................................................... : ........................................ ~ .............................................. · .......
.
.
...
:ASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, .... .'.".-'i"i'~i ......... ·
................................... TRU ...............
.... MEASURED .... VERT ! CAL. SUB MD-TVD ...... VERT l CAL ......................................... .'_ j. ~.~ '____' _ i "' ._.. ' .......................
..... DEPTH ............. DEPTH ,SEA DIFFERENCE ..... CORRECTION ......... TOTAL COORDINATES .......
........ 10596 ..... 9100, 9000, 149~ ......... 1496 ..................45?0°?8 ,S
10708 .............. 9200* 9100, 1508 ........... 12 ............. 4919,33 S
---10821 .......... 9300° 9200, 1521 ..................... 19 ....................... 4959,29'$
..... 11047 ........ 9500, 9400, 1547 ................ 13 ....................... ~070,28 $
.... 11160 .......... :9600, 9500, 1~60 ............... 13 ............. Dl19,69 $
93D,96 E ............................
921,9i E
903°?2 E
886,86 E
8?0,43 E
I_'r:i~RPOLATED '_:'vALUES. :..F_OR...:E..'~EN'''l--OO0 :FEE.T....OF. 'MEASURED. _DEPTH.;. "____-::.~'.':~-.-:::::-:._: ............. :: '-:.,.' .......................
,%,
........................... TRUE ................................................
--- HEASURED ....... VERTZCAL ......... SUB ........
..... DEPTH ............... DEPTH ....... .SEA :.-'_':_.:_'TOTAL:_' :cO0'RD.'iN~TE~ .... -."'-_---''-'---':":.-.::.:'::-::'-:::--:'-'--' '
---- 1'1000. --9~8-;:'_.-::9~,'~';':'_-"-'._:-_.-:--.':~049-';ii_ S___._.8'?:?-;-~-i'-_-. E .......................................................................................
.. .
,.
[ . . ,
.!. ~.' ~..'. .~ ...... L ~.~. '.
'. , ,. ~ : .......
, ,~ ~ ~ .
'I~ ' !"i' ,. il",
,. ii'? "~
..:.~..'-.!L' ....... i ........ } .... :L .....
· .:... ,... t.I.. .
I.i..;... i.t...[..i.I..~ ......
...~~....._..._~ !'~...-L..!..::'': :..__.,...
"'.il '~ ' ~ ' ' ' "' ~ [ I~ ....... II,' ' '
......... i' 'i' ~ '. I .....
"':'. 'I '~ ['"r' i ','"'i'"~"-~'
..[.',.,.'.I~ I.~..: I ...'.~.,.
'I ; ~. ~.~ ~ .: ~. ~ ~
"~'~','~ 't' '~ ..... ~ '
"' ~"I"~ ~ "i"~ .... I','~ '1"["~
"? ."~ ¢~"I '.".J ........ ~".
..... i' ~"1 ..... ~"~ .... I" '~'~ ,'
.".~"': ~'~', ; .... I~'i.~
: ,.,,.~ . ~ ~...~ ..?.; ,
.~. ~.,~.1 ,. [ : ~ I ~. ;...[ ~
~VERTICAL SECTION
: · ~_~,~ ~ :.. ,'-' ii' ~..
' -f-": ...... TAN 6EN;TI A L'", METHOD i-" ....... ! ..... j'-' ........
' ''' [ '' "." ' ": ' l'''' ~ ;: :
..... · 'j ";' ' ' '. ~' ' ' '. i ' . ' '
:': ,~z ::.: :'.::.~_':.t.:,~-_!_'., ',.,.,.zi '.:':___
.:.: i .li--T.. i..l....:~.~: :'.1...~,.: ..I..'--.., l.-" : ...-
' ' 'I :, ~ i I , : ' I ~ :'! I : , ' i , i
, ", , "; .... r' · · . ' '.':'i" ~ "~,' i ....
........ , ...... I .......... ~..I. 1. ..t
Z! ~... i.. ', L .L-, 1;...i-: :'-:.-.L.. ] '_~ :.~, Z.. ;....~ ... I j ,"'"Z.L.. i_L :'J.~-L_,: .~ ._
.... ] ..... ~ i. ~ '..t ':..', ..... :, : ': ~. ':.~ .J , ' . "
· :'"." '~"'i ...... :"!. i'::' ':' ";....i .. ',. '~i.;..;', .,.i .,.
. I ,
: .... : ........ :_.1 ...... -._
I '
: .
I '
! ! .
',
· : : .! : .' :
._ ~ ..Z,....~...,..,.... L.-;.,.. L
,.
-.i.-.;......
'. ,
.... " ....
' ' t ..... ¢ ....
. 7"; :. ~. ~ .: .~.
?i'~
' ~"r'l .":' i. .'..
..i......;....i ........ '~....~...
i...~ i ...t.
'' ''1 '1'' .
'l"
, i i'T' ',
· ..L ' .... I :': ..:.....~ ,
....... ,...
,'il ' ~.
, ~ .--. ~ ~ ....---.,
".~¥~ ,~ 9o~
.... --~...:......,~-L.....~._2_ ' '
:~'l': t
'.!.'i. '~',.. '.~. ~.
' ~'1 '..
' ~ ~ ! ' ~ ~ '. '
......... L_[ .............. : ........
: D: 9795'
iTMD=Iii$81'. ' .'...
__ ..~. ......... ~-.._;__~,._:_.
L-L-.~-L-.t.~ ....... :,.....J._.
i7i.: }-..~-
2_! ......... L....
'iI
i
.'j
HORIZONTAL VIEW
scALE 1":500' ' ,.
ATLANTIC RICHFIELD CO. · ;
:'I'BU K-4 REDRILL "
TANGENTIAL', METHOD, ....... i ........ ,
-- : !
.I
,
I
.,,
1
i i J '
, , "-T- -T' ......... , '"1 ............... : '-T' ........ ['""":"- :' ..... 2': ............: ........
. . 4 - ',,~ .... :.t ' . ~ . . ~.. ' :
.... i'"":'I~ ~ ......... ~ ~ :'., : [' ; .... r , '
..... ,....~ ~ ....... .:..L.L ....... '.... t..:. ..... ..~.L..L...._~ ....... '..' ......... 1 ..... .'..
I,.:'[. ~, ',., /.. 't-"'~' '
! I ' : 'i I . ; ' i" i i' ',, .",' ' I :"
, . : : ........ ~ ...... ,, .,. .... ~... ~ ·
I : ,. '. ', ~ ..I. !.i.~..,.i I : ! :..: I ', ':. : l.i
' - . , . ~ .... ' ~. -:- -I J . ~ .. ~ I :
i K'OP 3'VD' 9061',,"';'?:.-'['
i ..............
9200 ....
9600
TVD = 9795',
T'MD 11,581 ·
:TCOHPLI'TION REpOET" AUGUST 27,1.974. ....... . .............................................
'-ATLANTIC RICHFIELD COe .... .TRADING BAY'UNIT ........ K;,,~+--REDJ~ILL-:_-.B_":':::':'_-.:':-"_- .... :: ...... ::::::._'.-.::::::::_:::_:: ................................................
::-KELLY BUSHZNG ELEv'. .... 1OO FT DECLINATION '24 DEGREES
.._
':.RADIUS OF CURVATURE METHOD OF_.. COMPUTATION.
?_RE. PARE"D._ EOR_ADDCO .BY_. F_, ._.Me- LI NDSEY....AND. ASS.~)C--'
· .
' :- '-- ":i- ' '
· . .
..
.
.-. .-" '":: -', RECORD OF'SURVEY -- ~
":~./'; ::"~!~:-~::?:.~]i.,i~,~'.~A~AT_~,ON~._~P£RFORM.ED__.B~.. _~.._ .~._~=E~.E~o.~ lC..i.C'O~UT~R ].:~.-:ff-._i ~ -i_:i':.~'.: :'-... :',.-,-- -~-'. ....... .' ': .... -j-.-.:~i"-ii_~]. ~.-~:~'..
:_ - .. .
· .
_~_.:_. ~: .............. : ............ : .............. . . :-~ ........................................................... ~
.
.. -.
TRUE ....... -~ -- DOG LEG
"NEAS, DRIFT VERTICAL SUB DRIFT TOTAL COOED]NATES C L 0 S U R E S SEVERITY SECTION
-DEPTH-ANGLE DEPTH .... SEA' D]REC ............................. DISTANCE ANGLE DEG/IOOFT DISTANC'
............ D ~ ................. ' .............................. .DEGe ................................................................... DH S -'
:10552 29 45 9061,00 8961e00' S 2,OOE ~852,00 S .... 9~1.00 E .4942,40 S 10 58 ~2 E 0.000 ":49~9.~6
~:10683 26 ~0 9176.51 9076,5.1' S15,00~ ~913,t2 $ -9~,03 E -5001.11S 10 ~5 50 E
::10816 28 0 '-9294,75:919~,75 '$20,00~' ~971,15 S ..... 915,73 E
'-':108~9 2'8 "0 ?9323.88 "'9223.88 S20.OOW- 4985.73'S 910,~3 E
-"11068 2.8 O' '9517.25 9417,25 S18,00N.-5082.94 S 876.95 E
":i1120 26 ~5 9563,43 9~63.43 S16,00W 5105,81'S '-869.96 E
'1i!37 26 ~5-9578o61 9478,61 S18,00W. 5113.12 S 867,73 E
___
-11270'28 15 '9696,58 9596.58 $16.00W 5171,85 $ -8~9,77 E
'-11381 28 0 "979~.47 9694.47 SI?.OON 5222,02 S "83~,91E
50.5zr.82 S 10 26 1~ E
5068.18 S 10 20 .54 E
5158,01 S 9 ~7 19 E
5179.39 S 9'40 10 E
5186,23 S 9 1~7 5~ E
52,r, 1,20 S 9 19 50 E
5288.3~ S 9 5 I E"
6.017 '4998,7~
2.132 :.. 5053,22
0.000 5066,77
0.429 ' 5157.55
2o941 5179,0~
5.295 5185-92
1,343 5241.11
0.478 5288,34
....
_ .
-BOTTONI HOLE CLOSURE 5288,~z~ FEET AT S 9 5 I E .............................................................
_
.. -.
-._
..
.-
..
.
...........
..............
. .....................................................
.... ~ ........ . ............. . .... . ........................................
.
. .
-: --~-~ ~ ~Su~ E ~. ........... :....v._~ ~ ? ~ c ^ [ ._'SUB-'-i-~'i-~ t~;, v ~ 'T-~-_T'_--7':i~ ~ ~'~- ~'C-a ~ ........................................................................
-- '-:' "DE.P._?H 'DEP_?_H___$EA_D.!._FF-ERENCE._ CORRECTION ........ _TOT_-AL__'_-'c6oRD iNA;I:I~$ .... .i.'ff__-_- .......................................
.
.
. :..:. .
-..- I-0-5'97--.9100, -'9-000 . 1497 ' i4~? ...... .. ~'87'~;-78-'-s ...... -~4o;-~6-
--.-"~I0700 .......... m'--'-:7'9200" .....9100; '-1~09 .... ':]:2' ----.4924,36 $ " 9~0,92
":t0822 9300. "'9200 -'1522 -' 1~ .................... "4973.80
10935' 940-0, .....9.300-'"1:535 ...... i3' 5023.77
t1048'-" ......... 9500. '"9400 1548 ........ 13 ~074,02
1'1161 .... 9600. 9500 "1'560 12
11274 ............. 9700, ..... 9600 '1574 ........................ 14 ...................... 5173.61
914.77
i I I
896.88
879.87
864.41
84g,27
. _.
:'INTERPOLATED- VALUES --FOR EVEN '1000 'FEET. 'OF-..'HEASURED'DEPTH,
DEPTH
TRUE ...............................................................................................
VE~T Z CAL ........ SU~
.DEP TH SEA ........ :"-TOT_.A.L_._'
'" 96'57, ....... 9~57',"
505,2,:66' S ...... 886*-98-'E
. ' .........................................................................:- .................................. -4.. ............. .'* .................
· . . .
.
....... _ ................... _. ....... ~.~- ........................ . .........................
............................ - ............ .'_.._ .J .......................................................................................................................... :..: ...... ;. - .........
·
· .
..... ~-~ '--' ....... -'- ............ ;" '~'. .............................................. ; .................. : '-": ...... E- ............ ; ........... ! ......................................................
.
~ ' · ' ~ .... ' ' , i . , . t I , .
',:
--~'-" '--~-~-' I "-'---h'--'"--~'i - .... ~ t.-'. · ' ..: . : i : : i . , ,, , , . ~ : . I .
, , .~ ' .
" ' 't ': '! ';· ,, I . '
, ~ i i ' '' ' ' ' ~ ~-' ' ' ' ' I ' : ' , ~ : , ~ , , [ . i . , , i ,
,.. ~. I ~ ~ ~ :,. ~, ~ ',.~ ~-~ .... ~..' ............ .............. ~ ' '
~ ~',"~ .... :' 1":', i'~~'~": '~ , ~' -'
............................ ~.~ ................ . ................... , ..... . ~-x ..... ..
, , ' - I ' : . I . , I--'~' ·. ' ~ ' ' .
.'," "' "", ~ ...... ~"1'~ ...... ~". I ...................................
;' ~
'~." ;'~. ,' ~" ' . ....... ~" ' t ......
~.:
...... ~..,....~..~..'.,. ~..~...~..~.: .. I" ....... ~'.'" : "~ · ' ....... . ~. , : i. · . ~ . :
'~..~ " . '~ ','~ t"~...' ~~ i ~'' '~' :' "~ ~" ~. "~:, ~ ~ ~ ~'~:
, , ,.. ~= ,~ ,~,., ~~~: ~ : ~.~%''.;~'::~'.' ~'~' .:.~','~.'.~.. ~ ~.~.'~'~
"',: "', ........ [' ": '" ..... ~". ~":'"~' ~~ '.~~_~% ............ L...' ......... ~...~." ~ ' ': :: ~.~ ...~ ........ :.._'_.r....~_:~...~_~_
. . . ..~, :;;~
.... i"'-': ....... -
_i .i..i .~-..i..i-.; .... ~,~
"~ , ',' I ......... ' .... ~"
...L : I .~ !.' t_~ ~:.
· .,.....!.., . ~ : ~ i { .: ~ i !
:.i ,'"1" i"i'i
.'..~ ;..,'.ti";. :";' ~' l."!"'i'.,~..;',.t..'..:.'."!i,'.'i'.
...... ~ .......... :"-7""7 .......... :-T' ";-7'"f--F"'7" ,T"'
· ~ .... ',.I ....... . I .............. t_,, ..........
' I : ~,, I i I .... I i I
'["'r'"i ........~'"~'"i .... :".; :."T ";"T"'i'"i"'
'","!':.' ,": ',-i"!" '~ "' i ......
~.., .., ~...~ ......... : ...... ! ..................... ] .........
, '~ . .-:':. i · , ~F-"'~ , ,- .i......',
'J'"'~ ~ .... i' :'i"i ,'"i"l ..... I' i""i '
........ ~ ..... , '; .:.-.: ..! ..........
.......I i ~ [~ ! ~ t ~ ,~' -~ ...... I ' '....;~' .~f ~ = ~': ...;
1.1..,..i ,I . .,: .........~ , ,.~..:
........~ '~ .......... , ._ L_.~_',....'_L_ i....~. _'. ...... .~ .....
J...~.,..',...I.. ~ .. ! I ..:..:. ', .......... - ..... ~...~..
i / ' t = ' ~ ,
. . . ..... ~ ....... ,, .... ,, , . . .~ . . .... ~.
._.'~ !..'! ~.. i'!.1 ' '..~ .... I..i ~.' ..
.... '....!.-!....~ ...... :.. ~ .... ~..! ...'. i.. :...I ....... '. ...... '..,.I '
-7~ :.:.F"-' ' . : i '.---- '-- i;
,
......... ' ........ rT' ',1 ................
I',
-- "!-~ :i' ,,'.-. ~; :"~" i--
.... J ....:..~..i. ,
,, '~"~"'~ I L.~:....!.~.i._
..~.,.i .... i. !..,' i I.! '
__ _L_L,' _!
'~i. .~..', I~'
· ' ~i.
[..
':i.i
..[ .
~ !. ' ' ' ' ':"i ........ '
i i '
: ;
.:~.!.t ...... , ,..'. t'. :' ~!..! i..
-': ....... 7-?,' "':-l' "" i"-'~ ....... I""~'", -', ............ ~'";
~ ~.~'I :1 '~r'i':}'.',"i:'~; '~':': .......
i"
"' ~ ! . .. ~. ~ i., ' !., ,. ii.
'i' 'i' i' "~"; 'i
"
!.', I : il;'..::..'...i..
i-.. .:... .... . .....................................
~ I ' " '
J ' "., . ...... ..
...! .... . . ~ ,..,..
~ i '. !...~... t ....
.[. , .... ..
1..:.i.', i i. i ..,I ' : ' ';'i'
· :. !. ! ~. ~.' :.J.i..:
... i...z._i .................... :....t...' 2...'. ....
~ , , , . i! ; '
.... ,~,i': ...... ~o~ .'.i I.
.., ............ _ ,., .... :
Il
..... ~ I ' ' ~ ..: ~ ! [ . ~.,
'''i : ' ' ......... .
· '. ' i ~.'.: .... '.J '
. ' ' : i ' ', i ' ~ TYD=~?~4' '." ~ :"~
" ........... ! ...................... "i'-'r~ ....... 'r~'--~L$~" .............
: ) L . , , L , , ,
II ...... ' .......... ; ............ r ...................... ~''
...}.!...! . . ~. ~ .... !.}.: ....
'i'Z r"i : ;' ! i i'i. i ; : :'; .. i . '
· 'l i ........... ' .... I'"~ ....... i ' ': · '
,.. : !:.,. ~., ....... ~,' ......... ~..'.,
· .L.L_:.....!...=~._L..! ...... !...~. .~...:.~ _I.=~.~ .... 1_.:..._-_'.....~ .......... u.:_.'..~....:, ....
!| ....... : .... t ..... .:,,., ,' I'~''
| ' ' ' ! !.'.!..' ' ~.I....i :.J.; .......
' ..~ . ~ ,.'t'. ~.i..'
. ~';'i , i . · i'."; ..... :'i'i ; i"~ i':':
.... , · . ; .. I : · ~ ..
i .' ..... '..'..;.: ..... ~_L .... : ......I ........ .. ~...~......
~. I KOP TVD=906i!" :.'.!.": L..~ '.1 .!.1" ....
[~'. .... I i I , ~ * ! ~ ' . ' . , , ' i , !
· ~: i"r'[ 'i"~" I ;';"' ,'i"': :", ': :,'; i. : ~' i '"
'~e200 ' ''l'''; ~ : ' .... : ' ' ~" i ' ~ ' ' '
:',~ . r .!i. L'. '.
........... ~- --~ ........................... ~ .......... , ....................................................
' .' .~ . : i : ' I .; .' ' :...'. : I '...: ' '
'' '' .......................... ''1"-: ..........
9600 ' , }', ;. t , · ',' 'i ' t ..... ' ' :
· i. ~.; ~'' : 't! ~ ~.' . ! '
i ....
. . , , .. ,m,
.. : ., , .......... , ........ .,....,,,,
.......... :'RADIUS
!.
OF' CURVATURE METHOD -i ....
·
.... ! ~ ! I : . ,. ; . . l
,~ · I ..... i i " ii
I , : ..........
__:_:._..:._.'....' ..... '_.!_ L: ...... : ......'~ ..... :.-..: ..-i. ,i ...L....'_,:
: '"!"" ' ! ": ' ;" : :' ! :· . ' I
.... ,.,,. _
; I ' i I ..... ' ' ':'; ; : ~ ' ' I
'i ~ i i i , ',.i i , ,', ,.
:il!
;
: HORIZONTAL VIEW
' ' SCALE I'* 500' . ....
' ATLANTIC RICHFIELD CO. ,
'' TBU'K-4 REDRILL B ' ' '
.,
·
, OIL AND GAS CONSERVATION COMMITTEE~'~' i.__i...i!_N.N.-~_~19~,~ :j!5~ 57~2~'222f"nSo-.~',:Am ~,E~C,~ bODE
': D S~-RIAI. NO
.-' I .,. ' ....
.,.O.T OF ..,.L,.e
&ND I/Y'OR, KOYIR OPJRATION$ ~:' ~--'~' r:. ,-- ' i'-re / ADL 17594
i~' I ~J' J Il I "I' I ' ~
.~ · , '~ .
'~. ~A.ME OF OP~P-~T~R ~ .... I 20~O[ I L~?~ 8. t.~IT F.~ OR LEAS~-
Union 0il Com~an[ of California * ~ ~'~ ~., :--. Trading Bay Unit
3. ADDleS OF OP~ATOlq ~--!--.---..~..-..'~.~. ~ 9 WE~-t-
g09 W. gth Avenue Anchorage~ Alaska 9gs10 ', .... ,,.~--~-- K-4 f14-2~) Redrill
4.
lOCATION
OF
WELl.
At S~oe: ~ CO~R~~ n s~. ~.. a.. ~. (~o~ ~o~
Conductor 11, Le~ 2, Kin~ Salmon ~latfo~ ~~
613'N + 130'~ of'SB cr Sec' 17, TgN, R13~, SM ~/ Sec 21, TgN, ~13~,
s~, ~IT ~O.
, , ~3-42..
13. REPORT TOTAL DEPTH AT EI~D OF MONTH. CH~G~ IN HOLE SIZE. CASING AND CEMRN~NG JOBS INCLUDING DEPTH
~T A_N'D VOLUME~ USED, PERFOP~,TIO~S, TESTS AND RESUL~ FIS)~I~G JOBS JU'N'K ~ HOL~ AND SIDE-TR~CK~-T'~ HO~
AND ANY OT~t SIGNIFICANT CHA.N'G~ ~ HOL~ OON'DITIONS
King Salmon Platform
TBU K-4 (1~-21] Redrill: .August,'1974 .
Drld 6" Directional hole £/11,i120.' to'11,439". Ran 29. jts'.{1210'] 18 lb/ft, N 80 Hydril
PJ Liner with BOT hydraulic MC liner'b-bUS/type long sleeVe (61'] tie back assembly w/o
flapper or packing rubber~ Tpj!of liner'@10,209' with' ~43." lap. BOT float shoe @11,459'
w/landing collar ~ catcher's~ ~-~,~'~'F~ ............. ~'J~n~d' liner'with'.ll0 sx'Class G cmt w/l% C~R-2
~ 0.2%. HR 7 mixed'@lS.8 ppg. Cemented withlfull returns.' ~OC.1Shr. Tagged top of cmt
@10,1S0' ~ drilled'out S9' of firm cement to'top of liner'@10,209'. Tested lap w/2000 psi
for iS min. OK. Drilled'cmt f/11,296' - 11,$S2'.w/4 1/8" bit. Ran GR-CBL 11,$06' - 10,100'.
Good bond throughout. Ran ~SO test'with tool at 10,1S9', 2000' ~.C. Dead in 1 min.
Recovered ~.C. and 20.' drilling mud. Reran CBL. Perforated 4 SPP 10,2SS - 10,26S' {DIL
depths]. Ran DST #2 ~ set packer'@10,19$". Tail @10,206'. Initial flow 10 min. Initial
shut in $0 min. Tool open'9 hr. Light steady blow to surface. No fluid. Pinal shut in
S hr 2S. min. Recovered'S000' ~.C. 2492'.rathole mud, 1060' watercut mud. I~ 194S. psi;
ISIP $156 psi; ff $156 psi; ~SIP $264 psi; Set'~Z-SV rtnr @11,250'. Perforated from
11,170' - 11,180' with'4 Jt~n.bo SPP with $ 1/2" casing gun. Set S" ~Z-SV Bridge Plug @11,160'
and tested with 2000 ps~., OK. Mixed ~ layed iS sx Class G cement plug with 1% CPR-2 ~
0.2% HR-7 on top of Bridge Plug. Pulled up SO' and reversed out @11,110'. Tagged cement
plug @11,110'. Displaced mud with Sea Water, then with'$4S, bbl diesel oil. Ran completion
string and Released Rig @8:$0 A~ 8/21/74. Tested BOP~ with'S000 psi and Hydril with'
1800 psi on 8-S, and 8-12-74. Rig Released @8:$0 AM 8/21/74.. PINAL'REPORT
Atlantic Richfield Company .Sub-operator
SEP9 'igTZ
14. I ~by · ' ........... ~"'
,~(/~~~//~--~__~..~,. .. 9ist. ~15. ~t, ~. 9/6/74
[OTE '~e- ~o;i~n t~i, f--~];-;;q~iHd ~, .eQch c,lendar ~th~ regordMs, of the ,tatu, of Ope~tiOn~' and must ~ flied in dupli,te with the
oil and gas con~ervatbn commiflee by the 15~ of the suec~ding m,~. ~le~ otherwise directed.
Y~rm No.
~EV. ~- I-?0
STATE OF ALASKA
OIL AND GAS CONSERVATION CO/V~ITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
WILL WELL
'~. NAME OF OPERATOR
Union 0il Company of California *
3. ADDRESS OF OPER. ATOI%
909 W. 9th Avenue Anchorage, Alaska 99510
4.LOCATION OF WEI.~
At surface:
Conductor 11, Leg 2, King Salmon Platform
613 N ~ 130 W fr SE cr Sec 17, T9N, R13W, SM
SUBMIT IN DUPLICATE
APl NILMERICAL CODE
50-133'-20075-01
LEASE DESIG~tATION AND SERIAL NC).
ADL 17594
IF INDiA~. A~OT~E~. OR TRIBE NAME
8. L.~IT F.A. RA{ OR LEASE NAME
Trading Bay Unit
9 WELL NO
K-4 [14-21) Redrill
10 FLF./.D AND POOL. OR WILDCAT
McArthur River - Hemlock
Sec 21, T9N~ R13W~ SM
12. PERMIT NO
, 7s-42
'"13. REPORT TOTAL DEPTH AT F. ND OF MONTH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
~T ~ VOLUM]~ USED. PEP~FO'RATIONS. TF.~TS ~ ~SUL~ FISHING JO~ J~K ~ HOL~ AND SIDE-~CK~ HO~
~D ~Y O~ SIGNIFIC~T ~G~ ~ HO~ ~ITXONS
/,' /' ,,!
/>'/))~. ....
KING SALMON PLATFORM
TBU K-4 (14-21) Redrill: July, 1974
Drilled 6" Directional hole f/ll,O16 - 11,286'. Stuck DP.@ll,188' on trip in hole.
Backed off @10,672'. Lost 516' fish in hole f/10,672 - 11,'188'. Attempted to
recover fish, unsuccessful. Cemented'fish in hole w/70 sx (104') cement plug
f/1'0,672 - 10,568'. Drilled cement to 10,574' KOP. Kicked off in sidetracked hole
@10,574'. Drilled 6" directional hole f/10,574 - 10,858'. Twisted off DC pin.
Lost 209' fish in hole f/10,678 - 10,858~. Fished ~ re~overed 29' of fish. Cemented
180' fish in hole W/lO2 sx {372') cement plug.f/lO,678 - 10,306'. Drilled cement
to 10,562' KOP. Kicked'off in sidetracked'kale #2 @10,562'. Drilled 6" directional
hole f/10,562 - 11,120'. Tested'BOP on 6-50, 7-11, 7-17, ~ 7-27-74. Drilling
@11,120~ on August'l, 1974.
AUO 1 5 i97a
. * , Atlantic Richfield Company - Sub-Operator .
~~'%'L~,-,~ ~. ~,-,~--.~,.,~ =~ District Drl~. S~.t'; ~ 8/12/74
NOTE --Report on ~is fo~ is re,uired ~r each calendar mnth~regardMss of the ItatuS of °PeratiO~-*-~ and must ~ flied in dupli~fe with the
oil and gas =onservatbn commiflee by the IS~ of ~he suo=~ding m.~, mle~ otherwise dir, cted,
l~t~ No.
lq~V. ~- I-?0
STATE OF AJ. AS~
SUBMIT IN DUPLICATE
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
WELL WELL
NAME OF OPER. ATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPER. ATOI%
909 West 9th Avenue , Anchorage, Alaska
4. LOCATION OF WEL~
615'N ~ 130W from the SE corner.
Section 17: T9N, R15W, S. M.
99501
AP1 NU~ER1CAL CODE
50-155-20075
6 LE~ASE DESIGNATION AND SEI~IAL NO.
ADL-17594
'; IF INDIAIff. ALOT'I-~E OR TRIBE NANIE
8. L~.'IT FARM OR LEASE NAME
Tradin~ Bay Unit
9 WELL NO
State K-4 C14-21) Redrill
10. F~:i.r~ AND POOL. OR WILDCAT
McArthur River-Hemlock
I1, SEC.. T.. R., 1%~I.. (BOTTOM HOLE
oa,mc'mv~
Section 21' T9N, R13W. S. M.
12. PEP, MIT NO.
73-42
"13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET A.ND VOLUM'ES USED. PE~2'ORATIONS. TESTS A.ND RESULTS FISHING JO]~ JI/NK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTKEI:t SIGNIFICANT CT-IA.NGES IN HOY.~ CONDITIONS.
KING SAIRON PLATFORM TBUS K-4 for June 1974.
6/14/74 MI ~ RU. Pulled GLV @ 10,896'. Killed well w/ 9.5 ppg mud. NU BOPE ~
tested rams w/ 1500 psi ~ Hydril w/ 1000 psi. 6/16/74. Pooh w/ 5 1/2" completion
assembly. Tested BOPE rams w/ 2500 psi ~ }{ydril w/ 2000 psi on 6/17/74. Cleaned
out to ll,500'PBTD. Spotted 125 sx. Class "G" cmt. plug across Hemlock perfs
from 11,297/ to 11,052 w/ tbg. @ 11,295". Tagged top of cmt. plug @ 10,742'.
Cut 55' window in 7" csg. from 10,522' to 10,605'. Spotted 60 sx. Class ,'G"
densified cmt. plug from 10,598' to 10,608'. CO cmt. to 10,554'. Drlg 6"
directional hole from DOP @ 10,554' to 11,016'. Tested BOPE on 6/24/74~
Drlg. 6" directional hole @ 11,016' on July 1, 1974.
Drlg. 6" hole @ 11,016'.
,lilt_ 6 i974
Atlantic Richfield Company, Sub-Operator
14. I hereby
7/12/74
NOTE --Report on this form is required for .each calendar month% regardless of the Stotuc of operations, and must be tiled 'in duplicate wit# the
oil and gas conservation commiflee by the 15th of the succeeding month, unlem Otherwise directed.
,
l~,rm,
·
~.L'~. ~- t-?O
,,
..
("
STATE O[. ALASKA
OIL AND GAS CONSERVAT!ON CON~ITTEE
~ONTHLY REPO..'t..T OF DRILL!NG
Ai'~D WCRKOV:~ OPERATIONS
OIL
NA.ME OF OPEI~A, TOR
Union Oil Company of Californ,~a
3 ADDRESS OF OPIER.A~'OR
909 W. 9th Avenue, Anchorage, AK
4 LOCATION OF WEJ.~
99501
At surface
613'N [ 130'W fr SE cr Sec 17, TgN, R13W, SM
SI.:BMrT 1~ D%,'PLICA'I~:
APl NUMERICAL CODE
50-135-20075-01
DESIGNATION AND SEKI.~L NO
ADL-17594
$ L.~IT F'.-%..riA! OR LEA.%K NAME
Trading Bay Unit
9 %v EI..L
K-4 (14-21) Redrill
lO FLF. L.D A_N'D PCK3L. OR WILDCAT
McArthur River - Hemlock
Il SEC. T.. R.
Sec 21, TgN, R13W, SM
12 P~"~XqlT NO
73 -42
13. REPORT TOTAL DF.,P~'I"H AT E,ND OF }.i¢).N'i'H, CHA.NGF.,S IN HOLE SIZE, CARING A~ C~I~.~T!HG JO~S IHCLUDIXG DEP~
SET ~ VOLL~S US~ P~ORATiO~S. ~TS ~ RESULTS FISHING JO~ JL~K IN HOL~ AND SIDE-~.ACKED HOLE
~D ~Y O~R SIGNIFIC~T ~G~ ~ HO~ CO~ITIONS
Operations to Redrill K-4 (14'21) commenced on 6-14-74.
JUN 2 6 I974
BI¥ISiON OF OIL AND {iAS
I
*Atlantic Richfield Company, Sub-Operator
~.--...<~.~/C, ,,,' .,'- ~/Q ,- ~¢ -,/" D~s't n.~]~ .ql~+ 6/26/74
' ~ 'I r,l }.' ~ ..~ · , ~.~ i..~- . · - ' ' '
.' .' ...... '~ . ' ' - ' ' - ' ~ ~ ~ ~ ~ _ . ~_c , ~tc _,
~'NOTE ~Repo~t on this focm is required fog each cOlendor ~nth~ reqOrdlesl of lh.~ status of ooeeation$, and must ~ filed In duplicate with Ihs
oil end ~as conservation commiffee by the 15th ~ tha ~ucc~ding month, Imls~s efherwisa ~ir~cfa~.
December 18, 1973
R6: Tl~ding B~¥ IJnli' K-4 (14-2t)
Union 011 Company, Operator
Permit No. 73-42
Mr. Robert T. Anderson
Union OII Coep,any
909 ~. 9i'h Avenue
Anchorage, Alaska 99501
Enclosed Is the approved appllcatlon, for permlt to drill the above referenced
'well .on or about Decambe'r 1'5, 1973, at a location In 'Section. 17, Township 9N,
Range 13W, S.~.
Wet'l samples 'and .core chips are not required. A 'directional survey Is requl,~ed.
Many rivers In Alaska and their drainage systems have been cl~sslfled as
'Impo~t for the. spanlng or mlgra~lon of .anadmaous fish. Operations ,'in
these ar~as am sabject to AS t6.05..870 and the regulations promulgated there-
under {Title 5, Alaska A.dal'nlstmtlve Code). Prior ?0 C~CI~Ig operations
yo~ may be .oon.~c~d by .~he Hab.ltat: Coordinator'ts office, Department of Fish
and Game...
Pollution of. my waters .of the State ts prohibited by AS 46, Chapter 03., Article
7 and the ~tat'l~$ 'p~t~ted th.e~.~der '(Tl?le 1'8, Alaska
C~., Chapte~ 70) ~d by ~ Ferret Wa,er Poi l'u~t~, C~.~I A~, as a~n~d.
Prlor ~ .~~i~ we.mil'ms ~u my be ~ta~ed by a ~pres~?a~lve of 'the
~pa~nf of Envt m~n~l C~se~lon.
I'n ?he event of suspension or .abandonment please, g:fve, this office adequate.
advance nolte, fi'cation so that we .may have a wltness present.
Very truly yours
Homer L. l~rrell
Chairman
Alaska O! I and Oas ¢~nservatlon ..Coant~e
EncFOsure,
Oep.arfment of Fish and' .Game, Habitat S~c~iorl. W/O encl.
D~p~rtment of Envtron.men~al C'~3nservatt'on w/o enc'l.
AtlanticRichfieldCompany
North Aj" i roducin..g Division
North AIk...,(a District
Post office Box 360
Anchorage, Alaska 99501
Telephone 907 277 5637
November 29, 1973
Nr. Homer Burrell
State of Alaska
Department of Natural Resources
Oil & Gas Division
3001 Porcupine Drive
Anchorage, Alaska 99504
Dear Mr. Burrell:
The Trading Bay Unit requests your approval of the
attached Application for Permit to Redrill the
K-~ (14-21) well. The $100 filing fee is also
attached.
We would like to spud the well about December 15
and would appreciate your prompt approval of this
application.
Very truly yours,
L.'N. Bell
Dist. Drlg. Supt.
Enclosures
blATE OF ALASKA
SUIIMIT IN
(Other joxtruetlk'
OIL AND GAS CONSERVATION COMMII'TEE'
APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK
Ia. Tit*re Or 'WOAK
REORILL []
°'" il0 °'" I]
WELl. WELt° f)THKR
2. NAM£ oF C)i'i"fLATOI~.
+:' Union 02'1. Company
3. ADDItF, S,~ O1" Oi'~iH. ATOI~,
909 W. 9th Avenue, Anchorage, Alaska 99501
DEEPEN [-!
PLUG BACK l-]
M I,I.TIPr.i:ZiiHg F]
4. LOCATION OF WELL At surface
613'N & 130'W fr SE er, Sec 17, T9N, R13W, SM
At proposed prod. 20lie
460'N & 955'E fr SW er Sec 21, T9N, R13W,_..
APl 50- 133-20675-01
6. 1,1.:A.q[,: L'Yk%'IGNATt()N A. NI) f::;.~tl..~., NO.
ADL- 17594
7. IF INDIAN. A.LLOT'FEE
I. UNI'I'~FAIt.M Olt LEA.SE NA:~1E .
Trading Bay Unit
9. WELL NO.
K-4 (14-21) Redrill
'10. I-'II.:I.D AND l'~,¢;t,. L)it WII,I)CAT
McArthur River-Hemlock
I! .%I-:('.. 'F.. It...M..
HOL~: O[IJEC'I'JVEi
Sec 21, TgM, R13W
13. I)I.~'I'AN(.'[-: IN MILE.'; ANr) I)ii.'.t:L'T'.ON F :O,~t NEAItE.'4T 'I'O','.'N OIL PC)ST OFFICF.' 12.
24 miles NW of Kenai
,,.moo,~t $100,000.00
14. BOND INFOIL~IATI(')N.
Tv.~:Statewide s,,.,.,.~ a.d,o~ ~o. Federal Insurance Co. #8011-34-40
ll§. NO. OF ACI%~
955~ ] 5116 '
TO ~AREMI' WEL~ DI~ILLINO. COMPI.ETED,
!
OH APPLIED FOR. ~.
R000 ' ll, 700 '
15. DIS FANCE F'liOM
LOCATION TO NEa,['IEST
P~%OPEHT¥ OR I EASE LINE,
IAI:o to nearest drig. Unit. if ally)
17. NO. ACIIE,S ASSIC;NFI)
7'0 THiS WELl.,
1~0
20. ROTAIiY Ol{ CABI.E TOOLS
Rotary
21. ELEVATIONS .(Show whether L)l~', I{'l', Cit. t'tc.; '-'" Al'PHC)X. DATE %%'O1{K WILl, .SI'AI,~'tTM
100'KB 12-15-73
2'J. I':tOPOSED CASING AN[) CEMENTING PI~.OGRAM
SIZE OF HOLE SIZE OF CA.C:.ING~ WEIGHT PER FOOT GRADE SETTING DEPT'Ii' QUANTITY ,ir
· , ./~
la" 13-3/8" 61.,~ J 28ao, ~6~5 sx Class O (in Pi'ace)'
/,.r,]°/4" 9-5i8" ltT~/ P a N 9952' ' 1'100 sx Cl,{zss O (in pi.ace)
6" ,5'h' 15# ........ N-80 1t700' 100 sx"c:La~s G ,(pror,osed)
, . , , ,
. , ..... , , , , , , ,,
see attached sheet
/b ti'b i[':: ?.,-; :_.," '
".:~ ,.~3 IE" ,'f IW ~,' ;"'~
~'"' ~i2 !f'f Il"))
' , "";' ;
- 7 i?/j",
~"; ti '1' ',~,.;
'* Atlantic Richfield Company - Sub-operator "':'; '"'.'.)ii ,.:.~,;x.i£)
,' AJ'.~r'~w,-'-.~.~, .,_ G,:~,.S
IN ABOVE .qPACE DF, qCT/IBE P~IOPOSKD .PROC, RANI: If propo.~ll Is to deepen or plug back. give data "o~'pfekq..'~t p.-oductlve 7one and
propo.,~'d nl.'.v prn¢iu¢.'tive zone. If pro[x,.~d is to th'ill or deel~n direct .onally.. give pertinent daL% ol~ subl;ur£:~¢e k~catkm.~ and mca.,,urcd
true vertical depLh$. Give blowout prevcnlrr p'roEram.
24. I hereby certify that khe2'urt'zoin~s ~ Corree/
..~.
(This space for State office t,s,.) CO~;)I'FI(3NSOF API'ROVAL' IF A'~Y: ·
P , ' ''
o .x~ $~u SEE T~NSMITTAL 'LETTER ...
DI~NAL SURVEY ItEQ~ A.P.I. NUM.~C~ COD~
' ~rrs ~ ~o 50-133-20075-01
_ - , - ;; _ · ..... :
PEHM'[T NO~
APrq{OVED
TITLE District Land Manager
.... 'rn'L~, ...... Cha{ rman
'" *See Instruction, O~ R~ve~e Side
We plan to rig up on Conductor #11, Leg 2, King Salmon Platform on about
December 15, 197B and do the following work:
l.
5.
6.
7.
8.
9.
Kill well with filtered inlet water.
Install BOPE, B000 psi double rams and Hydril.
Pull completion assembly.
Run 6" bit and clean out to ll,B00'PBD.
Spot cement plug from PBD to at least 100'+-- above Hemlock perforations.
Check top of plug, displace filtered inlet water with fresh water mud.
Cut window 10552-10605'.
Spot cement plug 10?00-10500'.
Directionally drill from KOP to ll,700'(MD) 50' away from existing hole
at top of the Hemlock in a North Easterly direction.
10. Run DIL logs with SP and BHC with caliper.
ll. Run and cement 5" N-80 15# flush joint liner with 100 sx Class G cement.
12. Clean out 5" liner to PBD.
lB. Run CBL with GR and collar locator.
14. Run single completion B-l/2" assembly.
15. Run production test and release rig.
j ~ 4
I
K-Ia
111i2
I
'1
I
I
!
I0
TO II~d~ 40 ·
TO IS,,I,~4 ,I
K-I
i!
KING
+
TD I;),1~0'
II ii I~ ~
K-II
7
8
ARCO
td cARTNUg ST
TD 10,255
J5
,(-,o 7_
9 T'D 1Z~447
I. L!
I
I
I
I
I
I
I
I
I
O~
o 2o~,N
i
union
Alaska District
WELL LOCATION MAP
ARCO SUB-OPERATOR
TRADING BAY STATE K-4RD
(14 --211
We plan to rig up on Conductor #11, Leg 2, King Salmon Platform on about
December 15, 1973 and do the following work:
.
5.
6.
7.
8.
9.
Kill well with filtered inlet water.
Install BOPE, 3000 psi double rams and Hydril.
Pull completion assembly.
Run 6" bit and clean out to ll,300'PBD.
Spot cement plug from PBD to at least 100'+ above Hemlock perforations.
Check top of plug, displace filtered inlet water with fresh water mud.
Cut window 10552-10605'.
Spot cement plug 10700-10500'.
Directionally drill from K0P to ll,700'(MD) 50' away from existing hole
at top of the Hemlock in a North Easterly direction.
10. Run DIL logs with SP and BHC with caliper.
11. Run and cement 5" N-80 15# flush .joint liner with 100 sx Class G cement.
12. Clean out 5" liner to PBD.
13. Run CBL with GR and collar locator.
14. Run single completion 3-1/2" assembly.
15. Run production test and release rig.
(~-~ MIDOL[
TO
i i ii I
K-Ia
I
I
K
TO II) 40'
K~I
K-18
TD 12.130'
II
iff
ARCO
McARTHUlt ST
TD 10,~55
f
15
K-I~
!
i
I
I
I
I
I
I
I
i I I ,
I
unlen
Alaska District
WELL LOCATION MAP
ARCO SUB-OPERATOR
TRADING BAY STATE K-4RD
(I.4 -211
OATE!
Company . ,/~/~/~
· ..
Lease & Wel 1 No. ~,~',
.. CHECK LIST FOR NEW WELL PERMITS
Yes No Remarks
1. Is wel 1 to be located in a defined pool ................. ~
2. Do statewi de rul es apply ............. : .......... , .. ~
3. Is a registered survey plat attached .. ................ ...
4.' Is well located proper distance from property line ...........
5. Is well located proper distance from other wells ............ //~j~
6. Is sufficient undedicated acreage available in this pool ........ -X/~JK
7 IS well to be deviated - /~
· · · · · · · · · · · · · · · · · · · · · · · · · ·
·
8. Is operator the only affected party ................... ~
'9. .Can permit be approved before ten-day wait ................ /~
~ ,,
·
10. Does operator have a bond in force . . . ~ .... . .........
..
l l. Is conductor string provided ...... . ............... ''
m,
12. Is enough cement used to circulate on conductor and surface .... ·
13. Will cement tie in surface and intermediate or production strings . /~ ~
.
_
14. Will' cement cover all possible productive horizons .........
15. Will surface casing cover all fresh water zones ..........
16. Will surface csg. internal burst equa-1 .5 psi/ft, to'next string ....
.
.
.
17. Will all casing give'adequate safety in collapse and tension ..... : .
i8. Does BOPE have sufficient pressure rating ................
Additional ReqUirements: , ,, --
'iRecommended :'"
~ .' OKG
~~j/ JAL
'' A~,Z~-)< LCS