Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout200-205 .: Project Well History File Covi~age XHYZE This page identifies those items that were not scanned during the initial prOduction scanning phase. They are. available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~t~O- c>~ .O.~'Well History File Identifier Organizing tc~o~,~ r~ RESCAN ~ Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: Two-Sided DIGITAL DATA ~ Diskettes, No. [] Other, No/Type BY: BEVERLY ROBIN VINCENT SHERYL~INDY Project prOofing BY: BEVERLY ROBIN VINCENT SHERYQWINDY Scar~ning Preparation c~ x 30 = BY: BEVERLY ROBIN VINCENT SHERYL~-~WINDY OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other i - DATE: ~'~'/~/~,~] S / '~f~/¢ Production Scanning Stage 1 PAGE COUNT FROM SCANNED FLEE: ,,,? ~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ YES Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREP/~'~.W~E FOUND: YES BY: BEVERLY ROBIN VINCENT SHERYL MAFIA/ ~WINDY/ DAT~ Z'~L,.~ NO NO RESCANNEDB¥: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: Is~ General Notes or Comments about this file: Quality Checked · III IIIIIIIIIIIIIIII 12/10/02Rev3NOTScanned.wpd F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc MICROFILMED 04/01/05 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE ,~~. ~-..'·~~;;.r '~ ,,""'-~"'''''~~ :~:·,t\ ..1\. ) STATE OF ALASKA ) ALASKA ulL AND GAS CONSERVATION COMMISSION ~ECEIVED WELL COMPLETION OR RECOMPLETION REPORT AND LdG' .... . MAR 1 0 2005 . " 1 a. Well Status: D Oil D Gas D Plugged IBI Abandoned D Suspended D WAG 20AAC 25.105 20AAC 25.110 D GINJ D WINJ D WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Top of Productive Horizon: 3151' NSL, 1159' WEL, SEC. 34, T12N, R12E, UM Total Depth: 3009' NSL, 1314' WEL, SEC. 34, T12N, R12E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 618930 y- _~980550 Zone- ASP4 TPI: x- 617012 y- 5979325 Zone- ASP4 Total Depth: x- 616859 y- 5979180 Zone- ASP4 .~--------_._---------- ._----------------------- --------------------- 18. Directional Survey D Yes IBI No 21. Logs Run: MWD, GR, RES, RES 1 AIT, DT 1 BHC, CNL, LDL, GR, Caliper, SP, MRES, USIT CASING, LINER AND CEMENTING RECORD SElTlNG DEPTH MD SElTlNG DEPTH TVD HOLE I OP aOTTOM lOP BOTTOM SIZE Surface 110' Surface 110' 30" 28' 2859' 28' 2829' 12-1/4" 2912' 6507' 2876 5595' 8-3/4" 22. CASING SIZE WT.PER FT. 94# 40# 26# GRADE H-40 L-80 L-80 20" 9-5/8" 7" Zero Other 5. Date Comp., Susp., or Aband. 11/21/2004 6. Date Spudded 12/29/2000 7. Date T.D. Reached 1/512001 8. KB Elevation (ft): 65.90' 9. Plug Back Depth (MD+ TVD) 2870 + 2839 10. Total Depth (MD+TVD) 6520 + 5608 11. Depth where SSSV set N/A MD 19. Water depth, if offshore NI A MSL 23. Perforations oRen to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD SCAN~~ED MAR 2 4 2005 26. Date First Production: Not on Production Date of Test Hours Tested MD 24. SIZE 3-1/2",9.3#, L-80 TVD A1isk'tVOI r&ctšas Gans. Conn..i:¡:¡iuh IBI Develo~rdœExploratory D Stratigraphic -(] Service 12. Permit to Drill Number 200-205 304-377 13. API Number 50- 029-22993-00-00 14. Well Name and Number: PBU 5-213 15. Field 1 Pool(s): Prudhoe Bay Field 1 Polaris Pool Ft Ft 16. Property Designation: ADL 028258 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) CEMENTING RECORD 260 sx Arctic Set (Approx.) 440 sx AS Lite III, 215 sx Class 'G' 268 sx Class 'G' AMOUNT PULLED TUBING RECORD DEPTH SET (MD) 5265' - 5477' PACKER SET (MD) 5401' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) 5200' -4913' 3150' -2870' PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-BsL PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + OIL-BBL Press. 24-HoUR RATE AMOUNT & KIND OF MATERIAL USED Set EZSV #1 P&A w/11 Bbls AS I Cement Set EZSV #2 Kick Off Plug: 65 Bbls Class 'G' GAs-McF W ATER-BsL CHOKE SIZE GAS-OIL RATIO GAs-McF WATER-BsL OIL GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None Form 10-407 Revised 12/2003 RBDMS BFL MAR 1 4 2005 Ot\\G\NÄl. CONTINUED ON REVERSE SIDE (' ... ~)F 2l3. ) 29. ') FORMATION TESTS GEOLOGIC MARKERS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Top of Ugnu Ma Sand Top of Schrader Sluff Na 5534' 4720' None 5747' 4893' 5823' 4957' Nb 5842' 4973' Nc 5884' 5009' OA 5922' 5043' OBa 5987' 5102' OBf-Base 6280 5378' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie HUbble~AJ\I·o ß ~ PSU S-213 200-205 304-377 Well Number Title Technical Assistant Date 03" O-()s Permit No.1 Approval No. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Michael Triolo, 564-5774 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Submit Original Only ~ Well: Field: API: Permit: ) ) 11/19/04 11/25/04 02/03/05 Doyon 16 S-213A Prudhoe Bay Unit 50-029-22993-00-00 200-205 Accept: Spud: Release: Rig: PRE-RIG WORK 1 0/10/04 DRIFT TO 5,282' SLM W/2.5 CENT 1 SB. (TOP OF JET PUMP). BAILER EMPTY. 1 0/12/04 RIH WITH 3 WT BARS 1 11/16",2.68" SCP JET CUTTER, 26' X 2.68" MOD, 4 GEMCO CENTRALIZERS RUN. CORRELATE TO GLM 5227'. POSITION CCL 5254', FIRED CUTTER-CUT TUBING 5260', GOOD SURFACE INDICATION, LOG UP, POOH. CUT TUBING 5260' WITH 2.68" SCP JET CUTTER. WELL SHUT IN. ) ) BP EXPLORATION Operations Summary Report Page 1 ... Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 Date From - To Hours Task Code NPT Phase Description of Operations 11/17/2004 05:00 - 07:00 2.00 MOB P PRE Move rig off from J-02b. 07:00 - 07:30 0.50 MOB P PRE Pre-move safety meeting with Tool Service, Security and all rig personnel reviewing pre-move route inspection and all rig move hazards. 07:30 - 15:00 7.50 MOB P PRE Move rig from J-Pad to S-Pad. Security stopped rig move for 2 hrs to clear the road allowing personnel to respond to Z-Pad. 15:00 - 00:00 9.00 MOB P PRE Work on cellar door and flowline mods 11/18/2004 00:00 - 00:00 24.00 MOB P PRE Continue rig mods, cellar doors and flow line. Install vacuum system lines and controls. 11/19/2004 00:00 - 04:30 4.50 MOB P PRE RD flowline platform and scud launcher. 04:30 - 12:00 7.50 MOB P PRE Spot rig over S-213. Spot and RU pit, pump and generator modules. R!G ACCEPTED @ 12:00 HRS 12:00 - 13:00 1.00 WHSUR P DECOMP RU to tree to circulate. 13:00 - 15:30 2.50 KILL P DECOMP Take on seawater. RU scaffolding in cellar. Berm rig. 15:30 - 16:30 1.00 WHSUR P DECOMP PJSM. RU DSM and pull BPV through lubricator. RD DSM. 16:30 - 17:00 0.50 WHSUR P DECOMP Hold pre-spud meeting with crew and all service personnel. Review well hazards and SOA. 17:00 - 20:00 3.00 KILL P DECOMP RU lines and pressure test to 2900 psi. Reverse circulate 20 bbls through choke using cellar manifold to remove freeze protect diesel from the tbg. Started taking mixed diesel and crude oil returns to cuttings box. Switched manifold and circulated a 40 bbl detergent sweep surface to surface holding 100-150 psi choke pressure to circulate diesel out of annulus. Circulate a second 40 bbl detergent sweep around to clean up tbg and csg. 20:00 - 21 :00 1.00 KILL P DECOMP Shut in choke and kill lines, monitoring pressure. RD and blow down lines. 0 pressure, open choke and flow check well for 15 minutes. 21 :00 - 00:00 3.00 WHSUR P DECOMP PJSM. ND tree and adapter flange. Break out tree and set behind well. 11/20/2004 00:00 - 01 :00 1.00 WHSUR P DECOMP Break out adapter flange and set out of cellar behind well. Enclose rig cellar with tarps. 01 :00 - 08:00 7.00 BOPSUP P DECOMP NU BOPE. Install HCR valves. Hook up choke & kill lines to HCR valves. NU riser & flow line. RU floor drain lines to flowline manifold. 08:00 - 08:30 0.50 BOPSUF P DECOMP PJSM with all rig personnel on testing BOPE. 08:30 - 09:00 0.50 BOPSUF P DECOMP RU BOP test equipment 09:00 - 12:00 3.00 BOPSUP P DECOMP Test BOPE to 250 I 3500 psi. Unable to test lower pipe rams with tbg hanger in the hole. Witness of test waived by John Crisp with AOGCC. 12:00 - 12:30 0.50 BOPSUF P DECOMP RD BOP test equipment. Blow down lines. 12:30 - 13:30 1.00 WHSUR P DECOMP PJSM. RU DSM and pull TWC through lubricator. RD DSM 13:30 - 14:30 1.00 PULL P DECOMP RU tbg equipment to pull 3-1/2" completion. 14:30 - 15:00 0.50 PULL P DECOMP MU DP with XO to 4-1/2" NSCT tbg hanger. BOLDS. PU 78k and unseat tbg hanger. Up weight wI tbg 77k. Pull hanger to floor. 15:00 - 16:30 1.50 PULL P DECOMP Break out and LD tbg hanger. MU to tbg and circulate 40 bbl detergent sweep around while reciprocating tbg 16:30 - 17:00 0.50 PULL P DECOMP PJSM with rig crew on pulling and laying down tbg, Printed: 217/2005 9:37:45 AM ". ) ) BP EXPLORATION Operations Summary Report Page 2~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 Date From - To Hours Task Code NPT Phase Description of Operations 11/20/2004 17:00 - 23:30 6.50 PULL P DECOMP Pull and LD 3-1/2" completion. Losses averaging 6-7 bph while pulling tbg. Recovered: 1- jt 4-1/2" tbg 161 - jts 3-1/2" tbg 3 - GLM's 1 - "X" Nipple 1 - 18.71' cut joint of 3-1/2" tbg 23:30 - 00:00 0.50 BOPSUF P DECOMP Monitor well. RU test equipment. Set test plug and fill stack. 11/21/2004 00:00 - 01 :00 1.00 BOPSUP P DECOMP Test lower pipe rams 250 /3500 psi. RD test equipment. 01 :00 - 02:00 1.00 PULL P DECOMP Clear tbg handling equipment from rig floor. Clean rig. 02:00 - 03:00 1.00 CLEAN P DECOMP Install wear bushing. PU BHA #1,6-1/8" clean-out assembly. 03:00 - 08:30 5.50 CLEAN P DECOMP RIH to 5241' with clean out assy picking up 4" DP from pipe shed. Fill DP and break circulation every 25 stands. 08:30 - 09:00 0.50 CLEAN P DECOMP Wash down from 5241' to tbg stub at 5265'. 5 bpm @ 550 psi 09:00 - 10:00 1.00 CLEAN P DECOMP Circulate 20 bbl detergent sweep followed 40 bbl h-vis sweep. Continue circulating to get sweeps out of the hole and clean returns. Losses averaging 6 bph. 5 bpm @ 550 psi 10:00 - 13:00 3.00 CLEAN P DECOMP Monitor well -level dropping. POH with clean-out assy P/U 107k Ibs S/O 105k Ibs 13:00 - 13:30 0.50 CLEAN P DECOMP LD 6-1/8" clean out BHA. 13:30 - 14:00 0.50 CLEAN P DECOMP Service rig, drawworks, crown, blocks and iron roughneck 14:00 - 15:00 1.00 DHB P DECOMP MU HES 7" EZSV bridge plug assembly. 15:00 - 17:30 2.50 DHB P DECOMP RI H to 5220' 17:30 - 18:00 0.50 DHB P DECOMP Break circulation. POH to 5200 and set EZSV. 18:00 - 18:30 0.50 DHB P DECOMP Pressure test EZSV to 1000 psi. 18:30 - 20:30 2.00 PXA N CEMT DECOMP Circulate while waiting for cement to be re-batched and sent to location. Testing of original cement showed a two hour set time, was sent back to the plant to be re-blended with a minimum 3 hr set time. 20:30 - 21 :00 0.50 PXA P DECOMP PJSM with Schlumberger, MI, Veco and all rig personnel on mixing and pumping cement. 21:00 - 21:15 0.25 PXA P DECOMP Pump 5 bbls water to fill lines. pressure test cement lines to 3500 psi. 21 :15 - 21 :30 0.25 PXA P DECOMP Batch mix and pump 11 bbls (66 sxs) 15.7 ppg, Arctic Set I cement. Chase with 10 bbls of water behind cement to flush lines. 21 :30 - 22:00 0.50 PXA P DECOMP Switch to rig pump and displace cement with 49 bbls seawater. 22:00 - 22:30 0.50 PXA P DECOMP POH with 5 stands to 4700' 22:30 - 23:15 0.75 PXA P DECOMP Circulate clean seawater around to ensure DP is free of cement. 23:15 - 00:00 0.75 PXA P 5 bpm @ 300 psi DECOMP Displace well to 9.5 ppg used LSND mud. 11/22/2004 00:00 - 02:00 2.00 PXA P 5 bpm @ 490 psi DECOMP Pump dry job. blow down top drive. POH with setting tool Printed: 2F7/2005 9:37:45 AM .~ ') ) BP EXPLORATION Operations Summary· Report Page 3 _ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 Date From - To Hours Task Code NPT Phase Description of Operations 11/22/2004 02:00 - 04:00 2.00 PXA P DECOMP MU EZSV #2 and RIH to 3155' 04:00 - 04:30 0.50 PXA P DECOMP PU to 3150' and set EZSV. P/U 84k Ibs S/O 80k Ibs 04:30 - 06:00 1.50 PXA P DECOMP Blow down top drive and POH with setting tool. 06:00 - 07:00 1.00 STCTPL P DECOMP Pull wear bushing and rig up double valve on 9-5/8" X 7" annulus. 07:00 - 09:00 2.00 STCTPL P DECOMP MU BOT csg cutter assembly and RIH to 2950' 09:00 - 10:00 1.00 STCTPL P DECOMP Position cutters @ 2950'. Cut 7" csg. 10:00 - 11 :00 1.00 STCTPL P DECOMP Establish circulation through 9-5/8" X 7" annulus. Circulate -50 bbls dead crude out of well. 11 :00 - 13:30 2.50 STCTPL P DECOMP Displace annulus to hot seawater followed by 100 bbl detergent sweep. Then displace annulus to 9.4 ppg LSND mud 4 bpm @ 950 psi 13:30 - 14:00 0.50 STCTPL P DECOMP Pull 1 stand, MU spear assembly and spear 7" csg. BOLDS 14:00 - 15:00 1.00 STCTPL P DECOMP Pull of to 350k Ibs, establish circulation and work casing pulling up to 375k Ibs. Able to pull csg 3' up hole. 15:00 - 16:30 1.50 STCTPL P DECOMP Attemp to work casing back down. Able to work hanger down to 1.5' above ring. 16:30 - 17:00 0.50 STCTPL P DECOMP Release spear. LD spear assy. 17:00 - 19:00 2.00 STCTPL P DECOMP POH and LD csg cutter assembly. 19:00 - 21 :30 2.50 STCTPL P DECOMP PU spear assy and spear 7" csg. Establish circulation, 4 bpm @ 450 psi. Work casing picking up to 375k Ibs. Work csg 5' uphole. Packing off, no returns. Continue working csg picking up to 400k Ibs and attempting to regain circulation. NO progress. Un spear and LD spear assy. 21 :30 - 23:00 1.50 STCTPL P DECOMP PU csg cutter and RIH to 2915'. 23:00 - 00:00 1.00 STCTPL P DECOMP Rig service, inspect top drive. 11/23/2004 00:00 - 00:30 0.50 STCTPL P DECOMP Pump cutter knives open, RIH and tag csg collar at 2913'. PU l' to 2912' and cut csg. Cut at 2912',53' below 9-5/8" csg shoe. 00:30 - 02:00 1.50 PXA P DECOMP Pump dry job, blow down top drive. POH with csg cutter assy. 02:00 - 02:30 0.50 STCTPL P DECOMP PU csg spear and change out grapple. RIH and spear 7" csg. 02:30 - 03:00 0.50 STCTPL P DECOMP PU to 375k, attempt to establish circulation, packed off. Continue working csg, attempting to circulate. Csg finally came free at 395k Ibs. Establish circulation, 3 bpm @ 300 psi. 03:00 - 03:30 0.50 STCTPL P DECOMP CBU 4 bpm @ 300 psi. 03:30 - 04:00 0.50 STCTPL P DECOMP Pull csg hanger to the rig floor. Rig up csg equipment while circulating, 4 bpm @ 300 psi. 04:00 - 04:30 0.50 STCTPL P DECOMP break out and LD csg spear. Blow down top drive. CO elevators. 04:30 - 05:00 0.50 STCTPL P DECOMP PJSM with all rig personnel on breaking out and laying down csg. 05:00 - 10:30 5.50 STCTPL P DECOMP Pull and UD 69 jts of 7" csg, 29' of cut off jt, casing pup below hanger 10:30 - 11 :30 1.00 STCTPL P DECOMP UD casing equipment, P/U spear, make service breaks, UD spear 11 :30 - 13:00 1.50 CLEAN P DECOMP Clear and clean floor. 13:00 - 14:00 1.00 CLEAN P DECOMP Service rig and topdrive, lubricate and inspect crown. 14:00 - 15:30 1.50 CLEAN P DECOMP Change out saver sub on topdrive. 15:30 - 17:00 1.50 WHSUR P DECOMP Install double valve, flange and gauge on OA annulus. 17:00 - 20:00 3.00 REMCM-P DECOMP P/U 30 jts of 3.5" tubing, RIH with 4" DP, tag EZSV at 3,150', Printed: 21712005 9:37:45 AM ...,~~ Ii ,j ) ') BP EXPLORATION Operations Summary Report Page4 .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: S-213 S-213 REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 11/19/2004 Rig Release: 2/3/2005 Rig Number: 9ES Spud Date: 12/29/2000 End: 2/3/2005 Date From - To Hours Task Code NPT Phase Description of Operations 11/23/2004 17:00 - 20:00 3.00 REMCM-P DECOMP pull up to 3,143' UD joint of DP. 20:00 - 20:30 0.50 REMCM-P DECOMP M/U TIW valve and cement hose, CBU 5 bpm @ 300 psi, up wt = 75k, dn wt = 75k, held PJSM with all rig personnel andcementers, while circulating, 20:30 - 21 :00 0.50 REMCM-P DECOMP Pump 5 bbls water and test lines to 2,500 psi, pump remaining 13 bbls at 5 bpm @ 360 psi, pump 65 bbls 17 ppg class G cement, 5 bpm 320 psi, pump 2.5 bbls water behind, and displace cement with rig pumps at 5 bpm 250 psi, pumped calculated strokes to balance plug, 15 bbls, 176 strokes. CIP @ 21 :00 hrs. 21 :00 - 21 :30 0.50 REMCM-P DECOMP POH slowly to 2,174' 21 :30 - 22:30 1.00 REMCM-P DECOMP M/U topdrive, break circulation @ 1 bpm, increased rate to 6.5 bpm 270 psi circulate hole clean, no cement to surface. 22:30 - 23:30 1.00 REMCM-P DECOMP Pump dry job, POH to 955' 23:30 - 00:00 0.50 REMCM-P DECOMP R/U and lay down 3.5" tubing. 11/24/2004 00:00 - 01 :00 1.00 REMCM-P DECOMP Continue laying down 30 joints 3.5" tubing 01 :00 - 02:00 1.00 REMCM-P DECOMP Rig down tubing handling equipment, Install wear ring, Clean floor 02:00 . 05:00 3.00 REMCM-P DECOMP Pickup 3 DCs, 14 joints 4" HW, Jars, and 39 jts 4" DP. 05:00 - 06:00 1.00 REMCM-P DECOMP POH stand back 13 stands DP 5 stands HW. 06:00 - 06:30 0.50 REMCM-P DECOMP Make up 8 3/4" milltooth bit, clean floor 06:30 - 07:30 1.00 REMCM-P DECOMP RIH with clean out assembly to 1,990' 07:30 - 09:30 2.00 REMCM-P DECOMP Circulate @ 1,990' 2 bpm, 130 psi, while wait on cement. 09:30 - 12:00 2.50 REMCM-P DECOMP Wash from 1,990' tag top of cement at 2,203', Drill cement from 2,203' to 2,285', 10-25k wob, 410 gpm, 670 psi, 80 rpm, torque 3-4k, 40-60 fph. 12:00 - 21 :30 9.50 REMCM-P DECOMP Continue drilling cement from 2,285' to 2750' 20-28k wob, 415 gpm, 700 psi, 80 rpm, torque 4-5k, 40-60 fph. up wt = 95k, dn wt = 85k, rt wt = 90k 21 :30 - 22:00 0.50 REMCM-P DECOMP Circulate bottoms up, 415 gpm @ 700 psi. 22:00 - 23:00 1.00 REMCM-P DECOMP POH with clean out assmbly 23:00 - 00:00 1.00 REMCM-P DECOMP Break bit, stand back DCs. 11 /25/2004 00:00 ~ 03:30 3.50 CLEAN P DECOMP Make up 8 3/4" drilling assembly, orient MWD and motor, PJSM handling sources, load sources and pickup remaining BHA, surface test MWD at 640', flow rate 460 gpm @ 875 psi. 03:30 - 04:30 1.00 CLEAN P DECOMP RIH with 8 3/4" drilling assembly, position Ghost reamers @ +/- 1,000 and +/- 2,000' per directioal driller, continue RIH to 2694' 04:30 - 05:00 0.50 CLEAN P DECOMP Make up topdrive, break circulation, wash from 2,694' to 2,750' 380 gpm 710 psi. 05:00 - 06:30 1.50 CLEAN P DECOMP Drill cement from 2,750' to 2856' 380 gpm, 780 psi, 50 rpm, torque 4500 ftIlbs. 80 to 90 fph. '" 06:30 - 12:00 5.50 STCTPL P DECOMP Time drill off cement plug, from 2,856' to 2,886',3 fph for 3',5 fph for 10',10 fph for 17' maintaining a 15L toolface, 390 gpm, 1,240 psi on bottom, 1,100 psi off bottom, up wt = 97k, dn wt = 95k 12:00 - 14:30 2.50 STCTPL P DECOMP Continue drilling from 2,886' to 2,932', maintaining 50 psi differential pressure on motor, holding 15 to 20L toolface, began rotating from 2,932' to 2,962', 2k wob, 60 rpm, torque 4.5k, 425 gpm, 1,400 psi on bottom, 1,280 psi off bottom. 14:30 - 15:30 1.00 STCTPL P DECOMP Displace well to 9.2 ppg LSND mud, @ 425 9pm, 1,260 psi. 15:30 - 16:30 1.00 DRILL P INT1 Pull back inside casing to 2,758', rig up and perform LOT, 2,856 md, 2,828' tvd, mud wt 9.2 ppg, pressure attained 820 psi, EMW 14.7. Printed: 217/2005 9:37:45 AM ì¡J6Æ- lO(f"S{U'°t STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 RECEIVED OCT 1 2 2004 Alaska Oil & Gas Cons. Commission 1. Type of Request: nc orage II Abandon 0 Repair Well Plug Perforations 0 Stimulate 0 Other 0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well 2. Operator Name: BP Exploration (Alaska) Inc. . Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 7. KB Elevation (ft): 65.9' 8. Property Designation: 4. Current Well Class: 1m Development D Exploratory D Stratigraphic D Service 5. Permit To Drill Number 200-205 ./ 6. API Number: / 50- 029-22993-00-00 9. Well Name and Number: PBU S-213 ¡'" 10. Field / Pool(s): Prudhoe Bay Field / Polaris Pool PRESENTWal CONDITION SUMMARy Effective Depth MD (ft): Effective Depth TVD (ft): 6423 5515 12. Attachments: 1m Description Summary of Proposal D BOP Sketch D Detailed Operations Program 14. Estimated Date for / Commencing Operations: November 1, 2004 16. Verbal Approval: Date: Commission Re resentative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name well Crane Title Senior Drilling Engineer ADL 028258 110' 2831' 20" 9-5/8" 6481' 7" Perforation Depth MD (ft): Perforation Depth TVD (ft): 5892' - 6165' 5016' - 5268' Packers and SSSV Type: 7" x 4-1/2" Baker 'S-3' packer; 3-1/2" HES 'X' Nipple 110' 2859' 1530 5750 520 3090 110' 2829' 6507' 5595' 5410 7240 Tubing Size: 3-1/2", 9.3# Tubing Grade: Tubing MD (ft): L-80 5477' Packers and SSSV MD (ft): 5401' 2101' 13. Well Class after proposed work: D Exploratory 1m Development D Service 15. Well Status after proposed work: DOil DGas D WAG D GINJ D Plugged DWINJ 1m Abandoned D WDSPL Contact Michael Triolo, 564-5774 Phone 564-4089 Commission Us. Only Prepared By Name/Numbe~ Terrie Hubble, 564-4628 Date Sundry Number: D Plug Integrity D BOP Test D Mechanical Integrity Test Conditions of approval: Notify Commission so that a representative may witness D Location Clearance Other:Te~t- 50 PEtQ ~ 5'0(.') P ~ 0 ~ Dc r. et./ /!.Vo- ~c\ t- e 0 ~ Gel' APPROVED BY THE COMMISSION ~ GLJWr. bPO To: Winton Aubert - AOGCC Date: October 11, 2004 From: Mik Triolo - BPXA GPB Drilling & Wells Subject: Reference: S-213 Application for Sundry Approval - P&A for Sidetrack Operations API # 50-029-22993 Approval is requested for the proposed P&A of PBU well S-213. Parent well S-213 is currently configured as a jet-pump producer, but has been SI since November 2002 due to a failed jet pump. /' Significant time and effort have been expended attempting to fish the pump without success, therefore the de-completion plan calls for a tubing chemical cut above the jet-pump fish followed by the drilling rig setting a series of bridge plugs and cement to abandon the existing Schrader perforations. The drilling/ rig will then cut and remove the bulk of 7" longstring, which will allow for a cement KO plug aided sidetrack below the 9-%" shoe /' Well S-213A is proposed as a enta-Iat well, with four high-angle lateral wellbores in the OA, OBa, OBc, and OBd sands plus 0 ^ one" lateral from the OBc well bore into the OBb sand. The sidetrack is currently scheduled for Doyon 16 beginning around November 1 st. Verbal approval (via telephone conversation to Winton Aubert on 1017/04) to proceed with the Pre-rig decompietion --- work has been granted as no abandonment operations will be performed. The pre-rig work for this sidetrack is planned to begin as soon as it is able to on the schedule. See the attached diagrams for details and please call with any questions regarding the planned operations. Pre-Ria Work: * Notify the field AOGCC representative with intent to plug and abandon * 1. RU to pump down IA. Pump -90 bbls seawater down lA, displacing to the formation. Follow seawater with -53 bbls diesel freeze protect. IA volume to jet pump = 140 bbls. Rig up to tubing. Pump -60 bbls seawater down tubing displacing to the formation. Follow seawater with -18 bbls diesel freeze protect. Tubing volume to perfs = 75 bbls. Observe 1.5 bpm, 2500 psi max. Previous injectivity tests that were done showed a rate through the jet pump of approximately 1.2 bbls/min @ ......- 2,000 psi surface pressure a. NOTE: This will leave the well -60 psi under-balanced with the formation. A static BHP was taken on 9/18/04 which gave a reservoir pressure of 2,110 psi @ 5,000' TVDss (8.12 ppg EMW). These pressures assume a diesel gradient of 0.354 psi/ft down to 2,000' TVDss and a seawater gradient of 0.447psilft down to 5,000' TVDss. t-.. o/.^- b. NOTE: The well should not be left with methanol as a freeze protect fluid, diesel only. ..,,/ If;!;-. ..- 2. Rig up Schlumberger slickline, and drift tubing down to the jet pump fish with drift appropriate for 3.5" chemical cutter. Last well operation was CTU fishing attempts to retrieve the jet pump. Last tag was at 5,314' CTU MD. a. NOTE: It will be required to have the tubing and annulus h~ostatic pressures equalized prior /' to cutting the tubing. It may be desirable to punch holes in the tubing just below the proposed chemical cut depth in order to allow for pressure equalization. Optional string shot per SOP. S-213A Application for Sundry ~ 3. RIH wI chemical cutter. Cut the 3-Y2" L-80 tubing at approximately 5,250' MD. Chemical cutter is at the discretion of the Wells Group Representative. Tubing below this cut will not be fished; however a complete cut is critical to the successful decompletion. 4. Test all packoffs and tubing hanger seals to 5,000 psi for 30 minutes. MITOA and function test all lockdown screws, repair or replace as needed. a. Verify tubing and annuls pressures and provide data to the rig during the handover. Set a BPV in the tubing hanger and a VR plug in the 7x4-¥2" IA valve. Secure well. ~ 5. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Drillina Ria DecomDletion ODerations: 1. MIRU Doyon 16. Circulate out diesel cap with seawater. Verify the well is dead. 2. Set TWC. Nipple down tree. Nipple up and test BOPE. /' 3. Pull and lay down the 4-%" tubing (planned tubing cut at -5,250'). ' 4. PU 4,200' of 4" DP and stand back in derrick. MU clean-out BHA with 4" DP and flat bottom mill (or used bit) I boot baskets / etc. RIH to top of tubing stub PU additional 4" DP, circulate and condition wellbore as required. Pump hot oil to remove excess paraffin if needed. POOH. 5. MU 7" Halliburton EZSV (running 0~5 and RIH and set just above tubing stub@5,250').Set packer and test to 1,000 psi. Dump 0 b9Js cement on top of EZSV (-261' of coverage). POH and LD running tool. - 6. MU 7" Halliburton EZSV (running OD 5.5") and RIH an~ 3,150'. POOH and LD running tool. 7. MU 7" multistring casing cutting assembly and RIH to 2,9 'MD and cut casing. Close annular and circulate annulus clean with hot seawater and Safecle sweep, follow with 9.0 ppg mud. POH 8. Pull 7" casing and verify cut. Circulate and reciprocate casing to clean up remainder of mud/diesel in OA. Remove wellhead pack-off a~d " casing. 9. RIH with cement stinger and lay i 0 b Class G 15.7 ppg cement plug from EZSV @ 3,150' to 2,300' MD. (Assumes 200% exces . open hole portion from 2,940' to 2,860'.) POOH Estimated Start Date: 11/1/04 Mik Triolo Operations Drilling Engineer 564-5774 Home: 348-7404 Cell: 240-8076 S-213A Application for Sundry TREE = 4" 5000 psi WB...U-EAD = FMC 11" ACTUATOR - KB. ELEV = 64.4' BF. ELEV = 35.9' KOP= 2450' Max Angle = 49 @ 4442' Datum MD - 5948' Datum TV D = 5000' SS 9-5/8" CSG, 40#, L-80-tvO[}BTC, ID = 8.835" 2859' Minimum ID = 0" @ 5318" GLV#1 3-1/Z' TBG, 9.3#, L-80 NSCT, .0087 bpf, ID = 2.99Z' 547T PERFORATION SU~ARY REF LOG: SP-SUN EWR-DGR ON 01/01-06JU1 ANGLEATTOPÆRF: 31 @5892' Note: Refer to Production DB for historcal perf data SIZE SPF INTERV AL ODl1/Saz I)ð. TE 2-1/Z' 4 5892 - 5902 0 07/07/01 2-1/2" 4 6007 - 6027 0 05116/01 2-1/2" 2 6019-6021 0 05116/01 2-1/Z' 2 6155 - 6165 0 03/30101 6423' 6507' 7" CSG, 26#, L-80 tvO[}BTC, ID = 6.276" 5-213 2101' ST MD 4 2501 3 3763 2 5227 1 5318 5310 5322 5333 5378' 5401' 5440' 5465' 58' I SAFETY NOTES: 4-1/2" X 3-1/2" XONP, ID= 2.992" 3-1/2" I-ESX NIP, ID =2.813" I)ð. TE RBI BY CO~ENTS I)ð. TE REV BY CQ\.1IÆNTS 01/10/01 R3S AS COIvPLETED, N<\BORS 9ES 03/04102 rnSiKK PERF CORRB::TION 04/10/01 JJiKAK PERFS 04126/'32 J...Altlh CSG CORRECTION 04/28/01 CI-VTP CORRB::TIONS 07113/02 SDFiKK ELMDTTLOGGED 05/17/01 Dælth PERFS 07113/02 CAOiKK Ea..IPSE A<RS/JEf RJI\¡p 08103/01 A D'TP FCO D8'TH CORRECllON 04108103 rnsrrp TVD/tv'D CORRECTIONS 03101/02 JLG'KK FCO GAS LIFT MANrnELS TVD DBI TYPE VLV LATa-I FORT 2500 15 CA MM3 DOME RK 3500 46 CA MM3 rN RK 4500 43 CA MM3 rN RK 4600 41 CA MM3 SlO RK LPÆR ECLIPSE PKR WEA TI-ERFORD JET RJI\¡p LOWER B::LlPSE PKR 3-1/2" I-ESX NIP, ID =2.813" 3-1/2" I-ES X NIP.ID = 2.813" 547T I 5485 H ELM) IT LOGGED 03/29/01 I -I 5526' H 20' SHORT JOINT & RA TAG I 591T 20' SHORT JOINT & RA TAG FOLAR6 LNIT WELL: 8-213 PERMIT No: 2002050 AR No: 50-029-22993-00 SEC 35, T12N, R12E, 4501' FB... & 434 7' FSL BP Exploration (Alaska) DATE 04/13/01 04/13/01 04/13/01 04/13/01 15-2138 Proposed Post Pre-Rig 114' TREE: FMC 4-1/16" 5M WELLHEAD: FMC Gen 5 System 11", 5M csg.head w/ 7" mandrel hanger Ot packoff 11" x 11", 5M. tbg spool w/ 11" x 4-1/2" tubing hanger 11" X 4-1/16" Adaptor Flange KB Elevation = 64.4' 8.F. Elevation = 35.9' 4-1/2" X 3-1/2" NSCT XO @ 58' MD 3-1/2" 'X' Landing Nipple with 2.813" seal bore. I 2,101' MD 20" X 34" 215.5Ib/ft, A53 ERW Insulated 9-5/8",40 #Ift, L-80, BTC 12,859' I 7" 20' Short Joint & RA Tag @ 5917' MD 3-1/2",9.3 Ibltt, L-80, NSCT Drift /ID: 2.867"/2.992" Top of Cement from USIT Bond Log @ -3,000' MD (run on 01/09/01) Seawater from 2,000' TVD - perforations with diesel cap to surface Camco 3-1/2" x 1-1/2" GLM (set @ 2,501; 3,763; 5,227' MD) Tubing Chemical Cut @ 5,250' MD .let ...., ..... . ...t.8 MD Weatherford Jet Pump Straddle Assembly @ 5,310 - 5,333' MD Cameo 3-1/2" x 1-1/2" GLM (set @ 5,31S' MD) 7" 20' Short Joint & RA Tag @ 5,526' MD 7" x 3-1/2" Baker 'S-3' Production Packer @ 5,401' MD 3-1/2" 'X' Landing Nipple with 2.813" seal bore @ 5,440 & 5,465' MD. 3-1/2" WireLine Entry Guide @ 5,477' MD erfs: 5,S92' - 5,902' MD Perfs: 6007 - 6027' MD Perfs: 6155 - 6165' MD 7", PBTD I 6,423' MD I 7",26 #Ift, LSO, BTC-Mod I 6,507' MD I Date 09130/04 RevB MikT Comments Proposed Pre-Rig Decompletion G~H 1Ja6r.IH , WELL: 8-213 API #: 50-0290-22993 SEC 35, T12N, R12E, 4,501' FEL, 4,347' FSL 18-2138 Post Rig Decompletionl KB Elevation = 64.4' B.F. Elevation = 35.9' 114' 20" X 34" 215.5 Ib/ft, A53 ERW Insulated 9-518",40 l/ft, L-80, BTC 12,859' I Top of Cement from USIT Bond Log @ -3,000' MD (run on 01/09/01) .let ...., PIIII . ....... MD 7" 20' Short Joint & RA Tag @ 5,526' MD 7" 20' Short Joint & RA Tag @ 5917' MD &,,-z.1~" Date 09/28/04 Rev By MikT TREE: FMC 4-1/16" 5M WELLHEAD: FMC Gen 5 System 11", 5M csg.head wI 7" mandrel hanger & packoff 11" x 11", 5M, tbg spool wI 11" x 4-1/2" tubing hanger 11" X 4-1/16" Adaptor Flange / g,~'l.J':. 7" Casing Cut @ 2,940' MD ./' 7" CIBP @ 3,150' MD / Top of Cement Cap @ 5,000' MD / 7" CIBP @ 5,200' MD Tubing Chemical Cut @ 5,250' MD /' Weatherford Jet Pump Straddle Assembly@ 5,310 - 5,333' MD Cameo 3-1/2" x 1-1/2" GLM (set @ 5,318' MD) 7" x 3-112" Baker 'S-3' Production Packer @ 5.401' MD 3-1/2" 'X' Landing Nipple with 2.813" seal bore @ 5,440 & 5,465' MD. 3-1/2" WireLine Entry Guide @ 5,477' MD erfs: 5.892' - 5,902' MD Perfs: 6007 - 6027' MD Perfs: 6155 - 6165' MD 7", PBTD I 6,423' MD I 7", 26 lIft, L80, BTC-Mod I 6,507' MD I Comments Proposed Post Rig Deeompletion GL~Av WELL: S-213 API #: 50-0290-22993 SEC 35, T12N, R12E, 4,501' FEL, 4,347' FSL ~uLÆuŒ ~^ r.=;¡ 1'1 ¡ ¡ , II! ¡ ¡ L. !¡¡í It \.~) Ll IV? i h \ U\i FRANK H. MURKOWSKI, GOVERNOR A. ItA. S IiA. 0 IL AlQ) GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay S-213 Sundry Number: 304-377 Dear Mr. Crane: Enclosed is the approved Application for Sundry Approval relating to the above- referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. BY ORDER OF THE COMMISSION DATED this.l!tday of October, 2004 Enc!. Permit to Drill 2002050 MD 6520 f TVD DATA SUBMITTAL COMPLIANCE REPORT 41'16~2003 Well Name/No. PRUDHOE BAY UN POL S-213 Operator BP EXPLORATION (ALASKA) INC 5608 ~' Completion Dat 3/30/2001 ,-"'~' Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-22993-00-00 UIC N REQUIRED INFORMATION Mud Log No Sample No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type,,,~ Fmt (data taken from Logs Portion of Master Well Data Maint) Log Log Run Name Scale Media No Interval Start Stop OH I Dataset CH Received Nun~ber Comments LIS VERIFICATION FINAL /~uction Profile 5 FINAL 10325 FINAL 10372 FINAL Directional Survey FINAL Directional Survey FINAL Directional Survey FINAL MWD Directional Survey FINAL MWD Jewelry Static/~ FINAL temp/press ~'~ ~'- ,~0~ ~: Pressure/Temp Survey ~?~ ~0~ FINAL 10279 FINAL 5794 177 5794 5794 117 260O 5300 5888 177 6200 6492 6200 6200 6492 6414 6350 6O78 6492 Case Open OH CH CH oh CH ch ch OH 8/22/2001 ~..~1~0325 9/7/2001 ~2~9 9/7/2001 8/23/2001 0~325 8/23/2001 10/4/2001 ~t0372 2121/2001 2/21/2001 212112001 2/21/2001 2/26/2001 4/20/2001 6/1/2001 9/7/2001 1C1C~9 5794-6200 177-6492 LIS VERIFICATION 5794-6200 BL, Sepia 5794-6200 Digital Data 117-6492 Digital Data Dir Survey Paper Copy Dir Survey Digital Data MWD Dir Survey Paper Copy MWD Dir Survey Digital Data 2600-6414 Color Print 5300-6350 BL, Sepia 5888-6078 BL,--Sef~ 177-6492 DIGITAL DATA Well Cores/Samples Information: Name Interval Start Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Permit to Drill 2002050 DATA SUBMITTAL COMPLIANCE REPORT 4116/2003 Well Name/No. PRUDHOE BAY UN POL S-213 Operator BP EXPLORATION (ALASKA) INC MD 6520 TVD 5608 Well Cored? Y O Chips Re ce ived ? ..~-Y-f-h'----- Analysis ~ R ~.c~.iv~.d ? Completion Dat 3/30/2001 Completion Statu 1-OIL Current Status 1-OIL Daily History Received? /~ / N Formation Tops ~__~/N APl No. 50-029-22993-00-00 UIC N Comments: Compliance Reviewed By: Date: WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 October 01,2001 MWD Formation Evaluation Logs: S-213 POLARIS, AK-MM-00334 S-213 Polaris: Digital Log Images: 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 RECEIVED 042001 ~laska 0ii & Gas Cons. Oommi~'mr~ Anchorage BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Signe~ ~ ! DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS TONY KNO WLES, GO~VEOR~;~O~ 550 WEST 7TM AVENUE, SUITE 800 ANCHORAGE, ALASKA 99501-3560 PHONE: (907) 269-8800 FAX: (907) 269-8938 September 6, 2001 RECEIVED 2001 BP Exploration (Alaska) Inc. 900 East Benson Blvd. P.O. Box 196612. Anchorage, Alaska 99519-6612 Alaska Oil & Gas Cons. Commission Anchorage Via Fax (564-4637) and Mail Attention: Gil Beuhler Central New Developments Manager Subject: Prudhoe Bay Unit Tract Operations for Wells S-200, S-201 and S-213 on ADL 28258, W-200 (ADL 28263), S-216 (ADL 28261), and W-201 (ADL 28282) Dear Mr. Beuhler: Reference is made to your letter of August 31, 2001 regarding a request to continue Tract Operations for PBU Wells S-200, S-201 and S-213 on ADL 28258, W-200 on ADL 28263, S-216 on ADL 28261., and W-201 on ADL 28263-1.. The Division approves your request to extend the Tract Operations. for the six wells' from September 1, 2001 until the first of the month following the issuance of the Polaris Participating Area final decision, but in nO case, later than November 1,2001. Sincerely, Mark D. Myers Director cc: Cammy Taylor- AOGCC Wade Fennel- Chevron PBU.PolarisWELLS.TOExtension.doc "Develop, Conserve, and Enhance Natural Resources for Present and Future Alaskans." WELL LOG TRANSMITTAL To: State of Alaska September 5, 2001 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7t~ Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs S-213, AK-MM-00334 1 LDWG formatted Disc with verification listing. API#: 50-029-22993-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: RECEIVED SEP 0 7 2001 Anohorage WELL LOG TRANSMI AL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7~Street Suite # 700 Anchorage, Alaska 99501 RE' Distribution - Final Print(s) The technical data listed below is being submitted .herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Joey Burton / Jerry Morgan ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL OATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM COLOR Open Hole I I 1 S-213 8/1/01 Res. Eval. CH I I I -- , Mech. CH I" Caliper Survey Signed · Print Name: Phone:(907) 245-8951 Fax:(907) 245-8952 Date · ' VED Alaska Oil & Gas Cons. Commission Anchorage Pr~oAcTivE Di^qNosfiC SERvicEs, INC., }10 K $1REEr SUitE 2~ ANChO~qE, AK 99~O1 E-mail: pdsanchorage~memorylog.com Website: DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS i : _fONYKNOWLES, GOVERNOR 550 WEST 7TM AVENUE, SUITE 800 ANCHORAGE, ALASKA 99501-3560 PHONE: (907) 269-8800 FAX: (907) 269-8938 July 11,2001 RECEIVED ,JUL 13 2001 Alaska Oil & Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. 900 East Benson Blvd. P.O. Box 196612 Anchorage, Alaska 99519-6612 Via Fax (564-4637) and Mail Attention: Gil Beuhler Central New Developments Manager Subject: Prudhoe Bay Unit Tract Operations for Wells S-201 an01~l~n ADL 28258, and S-216 on ADL 28261 Dear Mr. Beuhler: Reference is made to your letter of July 10, 2001 regarding a request to continue Tract Operations for PBU Wells S-201 and S-213 on ADL 28258, and S-216 on ADL 28261. The Division approves your request to extend the Tract Operations for the three wells from July 11, 2001 until the first of the month following the issuance of the Polaris Participating Area final decision, but in no case, later than September 1, 2001. Sincerely, Mark D. Myers Director cc: Cammy Taylor- AOGCC Wade Fennel- Chevron PBU.PolarisWELLS.TOExtension.doc COMM L~ COMM ~ SR RES;ENG' RES ENG SR ENG , , ENG _ NRO SR GEOL , , GEOL , [GEOL ASST JSTAT TECH STAT TECH ,, . FILE ' "Develop, Conserve, and Enhance Natural Resources for Present and Future Alaskans." Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1167 COmpanY: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite t00 Anchorage, AK 99501 5/29/2001 Field: Polaris Well Job # log DescriptiOn Date BL Sepia CD s-213 <~ (~)0 ~) D~ PRESS/TEMP SURVEY 05117101 I 1 S-201 ,~-~,~.~I.'~/?'? 2116;' RST 03/27/01 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVED JUN 0 1 2001 ~ak8 CXl & Gas Cons. Comn~ .... Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 ATTN: Sherrie Receiv ! ALASKA OIL AND GAS CONSERVATION COPl SSION May 24, 2001 Gil Beuhler Central New Development Manager BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 2oo-2.o5 TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Subject: Application for Extension of Pilot Production Operations Well S-200; and Initial Production Operations at S-201, 213, and S-216 Prudhoe Bay Unit, Polaris Accumulation (Schrader Bluff Formation), ADL-028258 & 028261 File: Prudhoe Bay Field - Polaris Pool Dear Mr. Beuhler: The AOGCC has received an application from BP Exploration (Alaska) Inc. "(BP)" to extend pilot production operations at the Polaris prospect, Prudhoe Bay Unit, at Well S-200 through July 31,2001 and to initiate pilot production operations at wells S-201, S-213, and S-216 for a period of six months from the start of production. The request is based on the need for additional information to evaluate primary development and establish a depletion plan. On February 22, 2001, BP provided additional information to Jack Hartz, AOGCC Sr. Reservoir Engineer, regarding primary production and the anticipated pressure response during the extended production period. The AOGCC approved the original request for a waiver of the GOR limitations of 20 AAC 25.240 for production operations on S-200. The waiver of the GOR limitations is necessary to continue tract and production operations at S-200, and for the initial tract and production operations at S-201,213 and 216. Prior production reporting and allocation procedures are still applicable. Production should be reported to the Polaris Undefined Pool, number 640160. Your commitment to gather pressure data and maintain reservoir pressure above bubble point will ensure reservoir energy is not diminished prematurely. The evaluation work done, in progress, and planned surveillance will be sufficient to monitor well and reservoir performance for any adverse behavior. We anticipate you will keep the Commission informed about any significant developments. Therefore the Commission approves an extension of the Gas-Oil ratio variance through the end of July 2001 for well S-200, and for a period of six months from the start of production at wells S-201,213 and 216, conditioned on reservoir pressure performance. AOGCC approval is coincident with any restrictions imposed by The Division of Oil & Gas on Tract or PA operations. Pressure data should be forwarded to the AOGCC after each survey or pressure test. If there are any questions please contact Jack Hartz at 279- 1433 ext. 232. Sincerely, Copy: Mark Myers, DNR/DOG D.E. Dickinson, DOR Oil & Gas Audit PbupOlarisPilotOperations-RenewalSPad.doc STATE OF ALASKA ALASK OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 200-205 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22993-00 4. Location of well at surface ......................... ~, ~I.c~A~ 9. Unit or Lease Name 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM ~ ....... ~, V~ " Prudhoe Bay Unit At top of productive interval 3166' NSL, 1144' WEL, SEC. 34, T12N, R12E, UM :~_.~'~,~...,,~-;I..-.,..~ ~ .~~'~ '10. Well Number At total depth 3009' NSL, 1315' WEL, SEC. 34, T12N, R12E, UM S-213 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Polaris Pool KBE = 65.90' ADL 028258 12. Date Spudded12-29-2000 110' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'01/05,2001 00/30,2001 115' Water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsOne 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)119. Directional Survey 1 20. Depth where SSSV setl 21. Thickness of Permafrost 6520 5608 FT 6423 5515 FTI [] Yes [] No (Nipple) 2101' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, RES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, USIT 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surface 110' 30" 260 sx Arctic Set/Approx.) 9-5/8" 40# L-80 28' 2859' 12-1/4" 440 sx Articset Lite 3, 215 sx CI 'G' 7" 26# L-80 26' 6507' 8-3/4" 268 sx Class 'G' 24. Perforations .open to, P.roducti.on (M.D+.TVD of Top and 25. TUBING RECORD Bottom and ~mervah s~ze anc~ number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-1/2", Gun Diameter, 2 spf 3-1/2", 9.3#, L-80 5477' 5401' MD TVD MD TVD 6155' - 6165' 5259' - 5268' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL IUD) AMOUNT & KIND OF MATERIAL USED 2100' (Approx.) Freeze Protect with 75 Bbls of Diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) 04/11/01 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS-MCF WATER'BBL CHOKE SIZE I GAS'OIL RATIO 5/1/2001 4 TEST PERIOD 201 421 0 176I 2096 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. S mitooro] [CEiVF:D Alaska Oil & Gas Cons. Commission Anchorage .... Form 10-407 Rev. 07-01-80 ORIGINAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top of Ugnu Ma Sand 5534' 4720' Top of Schrader Bluff 5747' 4893' Na 5823' 4957' Nb 5842' 4973' Nc 5884' 5009' OA 5922' 5043' OBa 5987' 5102' OBf-Base 6280 5378' RECEIVED 1 1 2001 Alaska Oil & Gas Cons. Commission Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys, Formation Integrity Test 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ~'~'~~ Title TechnicalAssistant Date ~:~-lO" O/ S-213 200-205 Prepared By Name/Number: Sondra Stewrnan, 564-4750 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM ,5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 O !GINAL Legal Name: S-213 Common Name: S-213 ;:: Leak Off Pressure (BHP) EMW 1/3/2001 FIT 2,858.0 (ft) 2,838.0 (ft) 10.50 (ppg) 300 (psi) 1,848 (psi) 12.53 (ppg) Printed: 5/1/2001 1:41:10 PM BP EXPLORATION Page 1 of 5 Operations Summary Report Legal Well Name: S-213 Common Well Name: S-213 Spud Date: 12/29/2000 Event Name: DRILL+COMPLETE Start: 12/28/2000 End: 1/10/2001 Contractor Name: NABORS Rig Release: 1/10/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: 9es Sub I ' Date From-To Hours Task :Code Phase. Description of OperatiOns 12/28/2000 '10:00 - 12:00 2.00 RIGU PRE Load and move work shop. Move camp. Load and move pit module away from rig. 12:00 - 14:00 2.00 RIGU PRE Move rig from over well S-216. Had to maeuver rig several times to be clear of well S-200 to open cellar walls. 14:00 - 17:00 3.00 RIGU PRE Lay mats and Herculite around well S-213. Move rig into position over well S-213. Spot pit module. 17:00 - 18:00 1.00 RIGU PRE Spot camp and rig shop. Take on water and spud mud. Accept rig at 18:00 hrs 28 Dec. 18:00 - 23:30 5.50 RIGU PRE R/U Nabores 9ES to drill. N/U 20" riser on well. Finish taking on water & spud mud. 23:30 - 00:00 0.50 DRILL SURF Transfer 12 1/4" BHA tools to rig floor. 12/29/2000 00:00 - 01:00 1.00 DRILL SURF Finish transfering BHA tools to Rig Floor. Held Spud Meeting. 01:00- 03:00 2.00 DRILL SURF M/U 12 1/4" Drilling assembly. 03:00 - 04:00 1.00 DRILL SURF Fill hole with water. Check surface equipment for leaks. 04:00 - 07:00 3.00 DRILL SURF Spud well. Drill 12 1/4" hole from 110' to 230'. ART = 3 hrs 07:00 - 08:00 1.00 DRILL SURF Circulate 15 minutes. POOH. Rack 5" HWDP in derrick. 08:00 - 09:00 1.00 DRILL SURF M/U 12 1/4" Steerable Drilling assembly. 09:00 - 12:30 3.50 DRILL SURF Drill 12 1/4" hole from 230' to 398'. Art = 6 hrs. 12:30 - 13:00 0.50 DRILL SURF Circulate @ 398'. 13:00 - 14:00 1.00 DRILL COND SURF Attempt to take MWD survey. Mud aerated. Circulate & treat mud with de-fomer. 14:00 - 00:00 10.00 DRILL SURF Drill 12 1/4" hole from 398' to 861'. WOB 2-20K, RPM 50-60 w/3k Torque, GPM 440-492 w/1350 psi. ART = 8, AST = 1. 12/30/2000 00:00 - 13:00 13.00 DRILL SURF Drill 12 1/4" hole from 861' to 1452'. WOB 10-20K, RPM 60 w/3K torque, GPM 492 w/1350 psi. ART = 6.5 hrs. AST = 3 hrs. 13:00 - 16:00 3.00 DRILL CLN SURF Circulate & condition mud @ reduced pump rate of 240 GPM ( Due to cuttings tank level ) while waiting on Peak SuperSucker Trucks to arrive @ location. 16:00 - 00:00 8.00 DRILL SURF Drill 12 1/4" hole from 1452' to 1701'. WOB 10-20K, RPM 60 ( Mud-motor factor = 0.15 rpm/gal ) GPM 445-492 w/1350-1450 psi. ART = 2.5 hrs. AST = 4.5 hrs. 12/31/2000 00:00 - 06:00 6.00 DRILL SURF Drill 12 1/4" hole from 1701' to 1978'. WOB 10-20K, RPM 60 ( Mud-motor factor = 0.15 rpm/gal ) GPM 445-492 w/1348-1450 psi. ART = 2.5 hrs. AST = 2.5 hrs. 06:00 - 07:30 1.50 DRILL CIRC SURF Repair rig. Change out pop off valve on No 2 pump. 07:30 - 00:00 16.50 DRILL SURF Drill 12 1/4" hole from 1978' to 2822'. WOB 10-20K, RPM 60 ( Mud-motor factor = 0.15 rpm/gal ) GPM 445-492 w/1450 psi. ART = 5.5hrs. AST = 6 hrs. 1/1/2001 00:00 - 02:00 2.00 DRILL SURF Drill 12 1/4" hole from 2822' to 2896'. WOB 10-20K, RPM 60 ( Mud-motor factor = 0.15 rpm/gal ) GPM 445-492 w/1450 psi. ART = 0.75 hrs. AST =1.25 hrs. 02:00 - 03:00 1.00 DRILL SURF Circulate and condition mud. 03:00 - 05:30 2.50 DRILL SURF POOH for wiper trip. 20K over pull off bottom, 40K over pull at 2650'. Back ream 2600' to 2100'. POH to 214' 05:30 - 06:30 1.00 DRILL SURF RIH. Taking 10K weight 1650' to 1850' and 15K at 1960'. RIH no problems. 06:30 - 07:30 1.00 DRILL SURF Circulate and condition mud. 07:30 - 08:30 1.00 DRILL SURF POOH. Make wiper trip #2 up to 1400'. Tight at 1850' and 1650'. 08:30 - 09:30 1.00 DRILL SURF RIH to 2869' no problems. 09:30 - 10:30 1.00 DRILL SURF Circulate hole clean from 2869'. Drop ESS survey tool. Pump slug. 10:30 - 14:00 3.50 DRILL SURF POOH. Rack back 5" drill pipe & HWDP. Printed: 1/26/2001 4:34:36 PM BP EXPLORATION Page 2 of 5 Operations Summary Report Legal Well Name: S-213 Common Well Name: S-213 Spud Date: 12/29/2000 Event Name: DRILL+COMPLETE Start: 12/28/2000 End: 1/10/2001 Contractor Name: NABORS Rig Release: 1/10/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: 9es Sub Date From -To Hours Task COde Phase Description of OPerations :: 1/1/2001 14:00- 16:00 2.00 DRILL SURF L/D 12 1/4" BHA. 16:00 - 16:30 0.50 DRILL SURF : P/U 9 5/8" Casing Hanger. Make dummy run to landing ring in 20" conductor. L/D Hanger assy. 16:30 - 19:00 2.50 CASE SURF ~R/U Frank's 9 5~8" casing fill-up tool & NAD 9 5~8" casing running equipment. 19:00 - 19:30 0.50 CASE SURF Held PJSM with Rig Crew concerning casing running operations. 19:30 - 20:00 0.50 CASE SURF M/U 9 5~8" Shoe Track. Install centralizers and check float equipment. 20:00 - 00:00 4.00 CASE SURF RIH w/9 5~8" 40# L-80 BTC casing to 2747' ( 68 jts ). 1/2/2001 00:00 - 01:00 1.00 CASE SURF Establish circulation through 9 5~8" csg @ 2747'. Wash down last two joints to 2828'. M/U FMC GEN-5 Csg Hanger and land 9 5~8" csg @ 2858'. 01:00 - 03:30 2.50 CASE SURF Install Dowell Cement head. Break circulation. Stage pumps up to 9 bpm with 540 psi. Circulate and condition mud prior to cementing 9 5/8" csg. Reduced vis to 80. No mud losses observed. Held PJSM. 03:30 - 07:00 3.50 CEMT SURF Dowell test cement lines to 3500 psi. Pump 75 bbl of 10.5# MudPush spacer. Drop bottom plug. Mix & pump cement as follows: Lead = 440 sx of 10.7# ArcticSet 3-Lite ( yield = 4.44 cuft/ft ) + additives. Slurry vol 348 bbl. Tail = 215 sx of 15.8# Class "G" ( yield = 1.17 cuft/ft ) + additives. Slurry vol 44.6 bbl. Drop Top plug. Chase with 8 bbl water + 203 bbl of 9.5# mud @ 6 bpm. Final disp. pressure -- 460 psi @ 3bpm. Bump plug with 3500 psi-OK. Release pressure, floats held. Note: Had cement to surface with full returns. No losses observed. Dumped a estimated volume of 50 bbl cement. 07:00 - 08:00 1.00 CEMT SURF RID Dowell cement equipment. LID 9 5/8" csg Landing Jr. & R/D Csg running equipment. Flow check well while RID equipment. 08:00 - 09:30 1.50 BOPSUF SURF N/D 20" Bell-nipple & drilling spool. 09:30 - 15:00 5.50 BOPSUF SURF Install FMC GEN-5 11" 5M Unihead system and test to 1000 psi. N/U 11" 5M x 13 5/8" 5M DSA flange + 13 5/8" 5M BOPE. 15:00 - 19:00 4.00 BOPSUF SURF Test BOPE and all surface related equipment to 250/3500 psi. All test were APl. Install Wear bushing. Note: Witness of BOP test was waived by John Crisp of the AOGCC. 19:00 - 19:30 0.50 DRILL SURF Held PJSM concerning P/U BHA, tripping pipe, P/U DP & Safe Handling of Sperry-Sun's radioactive source. 19:30 - 23:00 3.50 DRILL SURF M/U 8 3/4" Steerable drilling assembly. 23:00 - 00:00 1.00 DRILL SURF TIH w/8 3/4" Steerable drilling assembly. P/U 21 Jts of 5" DP. 1/3/2001 00:00 - 02:00 2.00 DRILL SURF TIH wi 8.75" Steerable drilling assembly P/U 5" drill pipe to 2727'. 02:00 - 02:30 0.50 DRILL SURF Break circulation. Wash down from 2727' to 2765'. Tag-up on cement. Circulate bottoms up w/483 gpm @1250 psi. 02:30 - 03:00 0.50 DRILL SURF Blow down Top-drive. Test 9 5/8" casing to 3500 psi for 30 minutes. Test was APl. 03:00 - 05:30 2.50 DRILL SURF Drill out cement and 9 5/8" Shoe track from 2774' to 2858' ( Had firm cement in shoe track. Drlg w/10-15k WOB ) Clean out 12 1/4" rathole to 2869'. 05:30 - 06:30 1.00 DRILL SURF Drill 8 3/4" hole from 2869' to 2889'. Displace hole to 10.5 ppg LSND mud. Perform FIT. Pressure up on formation to 300 psi-OK. EMW = 12.5 ppg ( See FIT report ). 06:30 - 19:00 12.50 DRILL PROD1 Drill 8.75" Directional hole from 2889' to 4035'. WOB 5-10k, RPM 80 w/5k torque, 500 GPM w/1560 psi. ART 3.75 hr. AST 1.25 hr. P/U 118k, S/O 114k, Rot Wt 117k. 19:00 - 20:00 1.00 DRILL PROD1 Circulate hole clean from 4035'. 20:00 - 21:30 1.50 DRILL PROD1 POOH. Make 13 std wiper trip up to 9 5/8" csg shoe. Encountered tight Printed: 1/26/2001 4:34:36 PM BP EXPLORATION Page 3 of 5 Operations Summary Report Legal Well Name: S-213 Common Well Name: S-213 Spud Date: 12/29/2000 Event Name: DRILL+COMPLETE Start: 12/28/2000 End: 1/10/2001 Contractor Name: NABORS Rig Release: 1/10/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: 9es Date From-To Hours Task SUb I Code Phase Description of,..~era,,ons: 1/3/2001 20:00 - 21:30 1.50 DRILL PROD1 hole from 3657' to 2950'. Pulling 15k to 60k over string wt. Work pipe through tight spots with no other hole problems. 21:30 - 22:00 0.50' DRILL PROD1 Service rig and Top-drive. 22:00 - 23:30 1.50 DRILL PROD1 TIH to 3939'. Establish circulation. Wash to bottom @ 4035' with no problems. 23:30 - 00:00 0.50 DRILL PROD1 Drill 8.75" Directional hole from 4035' to 4127'. WOB 5-10k, RPM 80 w/5k torque, 500 GPM w/1560 psi. ART 0.5 hr. AST 0 hr. P/U 125k, S/O 108k, Rot Wt 118k. 1/4/2001 00:00 - 00:00 24.00 DRILL PROD1 Drill 8.75" Directional hole from 4127' to 5907'. WOB 20k, RPM 80 w/9k torque, 545 GPM w/2060 psi. P/U 155k, S/O 128k, Rot Wt 144k. No mud losses to formation. ART = 10.5 hr. AST = 5.75 hr. 1/5/2001 00:00 - 09:00 9.00 DRILL PROD1 Drill 8.75" Directional hole from 5907' to 6520' MDTD/5607' TVD. WOB 10-15K, RPM 80 w/11K Torque, 550 GPM w/2350 psi. P/U 196K, S/O127K, Rot Wt 155K. No mud losses observed. ART- 4.75 hr. AST = 3.5 hr. 09:00 - 10:00 1.00 DRILL PROD1 Circulate hole clean from 6520'. 10:00 - 12:30 2.50 DRILL PROD1 POOH for wiper trip to 9 5/8" csg shoe with no problems. Had normal hole drag 30-40k. 12:30 - 13:30 1.00 DRILL PROD1 Service Top-drive and Rig. 13:30 - 15:00 1.50 DRILL PROD1 TIH to 5400' with no problems. Establish circulation. Set-up Sperry-Sun LWD for MADD Pass. 15:00 - 21:00 6.00 DRILL PROD1 Continue TIH. Make MADD Pass from 5400' to 6400' @ 250'/hr. Circulate w/294 gpm + 950 psi DPP while logging with LWD. 21:00 - 21:30 0.50 DRILL PROD1 Finish TIH to 6520'. No hole problems encountered. 21:30 - 23:00 1.50 DRILL PROD1 Pump Hi-Vis pill. Circulate hole clean from 6520'. Spot Liner pill. Drop Sperry-Sun ESS to comply with JORPS. 23:00 - 00:00 1.00 DRILL PROD1 POOH to run 7" Production casing. Take ESS check shots @ 6433', 6337', 6243'. 1/6/2001 00:00 - 03:30 3.50 DRILL PROD1 POOH. Rack 34 stands of 5" drill pipe in derrick. LID 81 Jts 5" drill pipe. 03:30 - 06:30 3.00 DRILL PROD1 Continue POOH with 5" HWDP. Retrieve ESS. Held PJSM concerning safe handling of Nuclear sources. Remove source and download LWD data. Finish L/D BHA. 06:30 - 07:00 0.50 DRILL ! PROD1 Clean rig floor and remove excess drilling equipment. 07:00 - 08:30 1.50 BOPSUF~ ' COMP Change out Top DRP to 7" casing rams. Test BOP Ram bonnets to 3500 psi. 08:30 - 10:30 2.00 CASE COMP R/U 7" casing running equipment. 10:30 - 15:00 4.50 CASE COMP Held PJSM. M/U 7" Shoetrack and check float equipment. Run 69 Jts of 7" 26 Ib/ft L-80 BTC casing to 2836'. No mud losses observed. 15:00 - 15:30 0.50 CASE COMP Circulate 163 bbl of 10.5# mud through 7" casing w/5.5 bpm @ 450 psi. No mud losses observed. 15:30 - 20:00 4.50 CASE COMP Continue RIH with 7" 26 Ib/ft L-80 BTC casing ( 157 Jts / 6479' total ). Lost 18 bbl mud while running 7" casing through open hole section. M/U FMC 7" Casing Hanger assembly. Establish circulation @ 4.5 bpm w/ 1050 psi. Wash 7" casing down to 6507' -Shoe depth. Land 7" Hanger-OK. Lost 5 bbl establishing circulation. ( Note: Float Collar @ 6423' ). 20:00 - 21:00 1.00 CASE COMP Circulate and condition mud ( 427 bbl ). Stage pump up to 7 bpm with 975 psi FCP. Reciprocate pipe 20'-25' while circulating. No mud losses observed. 21:00 - 22:00 1.00 CASE COMP RID Franks 7" Fill-up tool. Install Dowell 7" Double plug cement head. Held PJSM. 22:00 - 22:30 0.50 CASE COMP Circulate and work pipe while Dowell preparing to cement. Printed: 1/26/2001 4:34:36 PM BP EXPLORATION Page4 of 5 Operations Summary Report Legal Well Name: S-213 Common Well Name: S-213 Spud Date: 12/29/2000 Event Name: DRILL+COMPLETE Start: 12/28/2000 End: 1/10/2001 Contractor Name: NABORS Rig Release: 1/10/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: 9es Date From -To Hours Task ,?u? Phase Description of Operations L;oae 1/6/20Ol 22:30 - 00:00 1.50 CASE COMP Dowell test cement lines to 3500 psi. Pump 30 bbl of 8.4# CW-100 + 50 bbl of 11.2# MudPush spacer. Drop Bottom Plug. Mix & Pump cement as follows: Mix 114 bbl ( 264 sx ) + additives of LiteCrete cement @ 12 ppg (yield - 2.39 ft3/sk ). Drop Top plug. Wash out cement line to rig floor with water. Line-up rig pump. Displace cement with seawater @ 7 bpm for 225 bbl w/2000 psi. Continue pumping at a reduce rate of 3 bpm w/1810 psi. Bump plug w/3500 psi. Total fluid displacement = 247.4 bbl. Full returns with no mud losses. Cement in place @ 00:10 hrs on January 07, 2001. 1/7/2001 00:00 - 00:30 0.50 CASE !COMP Finish displacing cement. Pumping @ 3 bpm w/1810 psi. Bumped plug with 3500 psi. Held 5 minutes. Release pressure. Floats held-OK. Pumped a total of 247.4 bbl seawater to displace cement. Had full returns with no mud losses observed. Cement in place @ 00:10 hrs on January 07, 2001. 00:30 - 01:30 1.00 CASE COMP RID Dowell cement head and related equipment. LID 7" Landing Jt. R/D ~7" casing equipment. Flow check well while rigging down equipment-OK. 01:30 - 02:30 1.00 WHSUR COMP Run and set FMC 7" GEN-5 "Type A-75" Dual compression seal assembly. Test to 5000 psi for 15 minutes. Test was APl. 02:30 - 04:00 1.50 BOPSUIq COMP Change out Top rams in BOP to 3.5" x 6" VBR. Test ram bonnets to 3500 psi. RID test equipment. .04:00 - 05:00 1.00 RUNCOI~I COMP R/U 3.5" Tubing handling equipment. 105:00 - 05:30 0.50 RUNCOI~I COMP Held PJSM concerning P/U and Safe handling of tubulars. 105:30 - 11:00 5.50 RUNCOr~! COMP P/U and TIH with 162 Jts of 3.5" 9.2 ppf L-80 NSCT Production tubing to 5142'. 11:00 - 12:00 1.00 RUNCOI~! COMP Circulate hole with clean seawater @ 11.9 bpm w/2300 psi. 12:00 - 14:30 2.50 RUNCOI~! COMP PJSM. Slip and cut Drlg line. Reset and test C-O-M 14:30 - 18:00 3.50 RUNCOI~! COMP PJSM. POOH with 3.5" tubing. Rack 54 STD total in derrick. 18:00 - 19:00 1.00 EVAL COMP N/U Wireline lubricator to BOP. R/U Schlumberger E-line equipment and prepare to run USIT log. 19:00 - 22:00 3.00 EVAL POWR COMP Schlumberger RIH with USIT log to 1700'. Having problems keeping Logging units engine running due to snow blowing into and clogging up the air intake going to the engine. POOH and RID. Note: A Phase-3 weather alert was issued at 20:59 hrs 1/7/2001. 22:00 - 00:00 2.00 CLEAN COMP Line up Rig pump on 7"x 9 5/8" annulus. Bullhead 60 bbl of 10.5# mud to clear annulus of any possible cement. It took 2100 psi initial pressure to break down for injection. Pump rate and pressure: 1 bpm w/850 psi, 2 bpm w/1050 psi, 3 bpm w/1200 psi FCP. The well will be freeze protected ASAP after Phase-3 has been lifted. 1/8/2001 00:00 - 20:30 20.50 EVAL WTHR COMP Operations suspended due to Phase-3 weather conditions. 20:30 - 21:30 1.00 EVAL COMP R/U Schlumberger Wireline Lubricator and E-line equipment. 21:30 - 00:00 2.50 EVAL COMP Schlumberger RIH with USlT logging tool to 6415' WLM. 1/9/2001 00:00 - 03:00 3.00 EVAL COMP Log w/SWS USlT from 6414' up to 2600' with 500 psi at surface. Reatively good cmt up to 3300'. Note: Injected 50 bbls. Crude Oil down 7"X 9 5?8" annulus while logging. 03:00 - 04:00 1.00 RUNCOI~I COMP Pressure test 7" Casing to 3500 psi for 30 min. - OK. 04:00 - 14:00 10.00 RUNCOi~I COMP Pull WR, Rig to run tbg, PJSM with all hands. Run 3.5" 9.2# L-80 NSCT completion string as per program with 163 jts tubing, 4 GLM, 3 X-nipples, Baker "S-3" production packer. 14:00 - 15:00 1.00 RUNCOI~I COMP P/U FMC 4.5" x 11" tubing hanger with one jt of 4.5" 12.6# L-80 NSCT tubing below hanger with XO to 3.5" NSCT. M/U in 3.5" tubing string. Printed: 1/26/2001 4:34:36 PM BP EXPLORATION Page 5 of 5 Operations Summary Report Legal Well Name: S-213 Common Well Name: S-213 Spud Date: 12/29/2000 Event Name: DRILL+COMPLETE Start: 12/28/2000 End: 1/10/2001 Contractor Name: NABORS Rig Release: 1/10/2001 Group: RIG Rig Name: NABORS 9ES Rig Number: 9es SUb Phase Description of Operations .: Date From-To Hours Task Code 1/9/2001 14:00 - 15:00 1.00 RUNCOI~4 COMP Land hanger with WLEG @ 5477', top of Baker "S-3" packer @ 5401' RKB. RILDS. L/D Tubing landing joint. R/U to reverse circulate. 15:00 - 17:00 2.00 RUNCO~4 COMP Reverse circulate 200 bbls clean seawater followed by 78 bbls SW with corrosion inhibitor, then 66 bbls clean SW. 17:00 - 18:00 1.00 RUNCO~/I COMP LID Landing Joint. Set TWC. Test 500psi from above and 1000 psi from below - OK. 18:00 - 18:30 0.50 WHSUR COMP PJSM with rig crew on N/D BOP & N/U Tree Procedures. 18:30 - 00:00 5.50 WHSUR COMP N/D BOPE, CIO Drip pan extension to 20", N/U Adaptor flange, N/U Tree. Note: Jim Denny & Dave Hebert here conducting individual safety briefings with all Nabors Hands. 1/10/2001 00:00 - 02:00 2.00 WHSUR COMP Complete N/U Tree & Adaptor Flange. 02:00 - 04:00 2.00 REST POWR COMP Generator shut down. Found water in diesl fuel. Change all fuel filters. Get back on line. 04:00 - 04:30 0.50 WHSUR COMP Pressure Test Tree to 5000 psi. - OK 04:30 - 05:30 1.00 RUNCOr COMP R/U DSM lubricator, pull TWC. Drop ball rod for RHC plug. 05:30 - 07:00 1.50 RUNCOr COMP Set Baker S-3 Packer w/3500 psi on tubing. Hold 3500 psi for 30 min. for tubing test. Bleed tbg to 1800 psi & pressure annulus to 3500psi. Hold fo 30 min. Bleed tubing and shear RP. 07:00 - 09:00 2.00 RUNCOk COMP R/U Hot Oiler, Test lines to 3500 psi. Reverse circ. 75 bbls. diesel down 3 1/2" X 7" Annulus for freeze protection to 2100 ft. Pres.equalized to 100 psi. 09:00 - 10:00 1.00 WHSUR COMP Set BPV. RID lubricator. Secure Tree. RIG RELEASED @ 10:00 Hrs. Printed: 1/26/2001 4:34:36 PM Well: S-213 Field: Prudhoe Bay Field / Polaris APl: 50-029-22993-00 Permit: 200-205 Date POST-RIG WORK 03/13/2001 Pull BPV set slipstop catcher sub at 2596' SLM. LFDN. Left well shut in. 03/14/2001 Run 3-1/2" OM-1 w/1-5/8" JDS. Pull 1-1/2" RPV at 2496' SLM (STA #4 RK Latch). Set 1-1/2" DGLV in same. MIT tubing and IA to 3500 PSI, Good Test tubing and iA bled down to 0 PSI. Pull ball and rod at 5460' SLM. Pull RHC plug body at 5464' SLM. Drift tubing w/2-1/2" DG w/SB. Tag bottom at 6421' SLM. Good sample, RDMO. Well-left shut in. 03130/2001 Perforate using 2-1/2" inner jet strip guns (2X) 10' BH EJ 2 SPF +/- 90 Degree. Perforate interval: 6155' - 6165'. Static temperature / Pressure at 6000' MD, tubing pressure = 100 psi. Temperature = 99.5 DEGF, Pressure = 2112 PSIA. Correlated to Sperry Sun EWR-DGR (1-6/Jan/01). Jewelry log short joints at 5524' - 5544' and 5915' - 5935'. PIP tags located at top of each short joint. Well-left shut in for fracture work. 04/01/2001 Set 3,1/2" Slip stop catcher at 5362' WLM. Pulled 1-1/2" DGLV and RK from STA #1 at 5310' WLM and installed 1-1/2" Petredat side pocket memory gauge and RK in same. Pulled catcher RDMO, left well shut in and notified operator of status. 04/02/2001 MIT-IA to 3000 PSI (Passed) [Ann Comm., FCO, MIT]. Data FRAC Schrader OBD FM. W/212 bbl YF140D fluid. Make adjustments to FRAC treatment. FRAC Schrader w/33,735# 16/20 RC Polar Prop w/Activator at 15 bbl MIN AVE TRT PSI = 1305 PSI. Screened out to 5635 PSI. Put 14486# PROP behind pipe 7.1 PPA at Perfs. Left 19267# in pipe. Pulled treesaver w/cups intact. Well left shut in and 5 bbls MEOH squeezed into tree. 04105/2001- 04/06/2001 BOP Test; RIH w/2-1/4" DJ Nozzle; RIH to clean sand from tubing. Tag bridges at 291', 357' and 499'; Tag sand top at 3600'; Heavy sand returns; clean out down to 6265' (100' below PERFS.); POOH at 80%, wash mandrel on the way out; Freeze protect to 2500' with 60/40. 04108/2001 Drifted with 2.70" centralizer to TD at 6205' WLM (-40' of RAT hole). Set catcher at 5342' WLM. Pulled 1-1/2" Petredat side pocket memory gauge from STA #1 at 5315' WLM and installed 1-1/2" DGLV. Pulled 1-1/2" DGLV from STA #4 at 2492' WLM and installed 1-1/2" generic OGLV and RK (20/64" PORT). Pulled catcher, RDMO returned well to operator. 4/12/2001 Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. T51 Company: Alaska Oil & Gas Cons Corem Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Well Job # Log Description Date BL Sepia CD S-213 ~ OD-~05 STATIC TEMP/PRESSURE 03/29/01 1 1 S-216 ~ OD-/(~--7 PRODUCTION LOG 04102/01 1 I · PLEASE ACKNOWLEDGE RECEIPT BY SIGNING.AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVF_..D ~as~a Oi~ & Gas Coos. C~ Schlumberger DCS - 3940 Arctic Blvd Suite 300 Anchorage A.K 99503-5789 ATTN: Sherrie 1/22/01 Schh berger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 AI'rN: Sherrie NO. 894 Company: Field: State of Alaska Alaska Oil & Gas Conservation Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Color Well Job # Log Description Date Color Sepia Prints CD S-213 21027 USIT 010109 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Date Delivered: J 11-Jan-01 AOGCC 3001 Porcupine Drive Anchorage, AK 99501 DEFINITIVE SURVEYS Re: Distribution of Survey Data for Well S-213 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 6,520.00' MD (if applicable Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) North Slope Alaska Alaska Drilling & Wells PBU WOA S Pad, Slot S-213 S-213 -Surveyed: 5 January, 2001 SURVEY REPORT January, 2001 Your Ref'. APl 500292299300 Surface Coordinates: 5980549.84 N, 618929.96 E (70° 21' 19.7314" N, Kelly Bushing: 65.90ft above Mean Sea Level 149° 02' 03.0011" W) nRILLING 5;ERVI I::E ~ A Halliburton Company Survey Reft svyl0707 Sperry-Sun Drilling Services Survey Report for S-213 Your Ref: APl 500292299300 Surveyed: 5 January, 2001 North Slope Alaska Measured Depth (ft) Sub-Sea Depth (ft) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 0.00 0.000 0.000 -65.90 0.00 159.50 0.080 297.520 237.57 0.190 189.700 331.11 0.280 217.180 419.83 0.460 188.450 93.60 171.67 265.21 353.93 448.17 540.48 633.11 726.13 821.43 514.07 0.270 140.230 606.39 0.350 136.820 699.02 0.400 110.750 792.04 0.150 142.580 887.34 0.360 98.800 159.50 237.57 331.11 419.83 514.07 606.38 699.01 792.03 887.33 980.61 0.430 98.440 914.70 980.60 1073.24 0.530 98.280 1007.32 1073.22 1164.71 0.560 78.600 1098.79 1164.69 1257.43 0.770 70.450 1191.50 1257.40 1351.47 1.250 70.290 1285.53 1351.43' 1443.61 1.800 76.020 1377.64 1443.54 1538.48 1.410 74.910 1472.47 1538.37 1634.08 0.740 66.980 1568.05 1633.95 1727.23 2.460 259.230 1661.18 1727.08 1818.21 6.280 254.600 1751.88 1817.78 1867.79 6.400 256.710 1801.15 1867.05 1911.45 6.390 253.070 1844.54 1910.44 2004.69 6.090 240.310 1937.24 2003.14 2099.24 5.630 239.010 2031.29 2097.19 2191.50 5.360 237.610 2123.13 2189.03 2286.10 5.130 235.240 2217.33 2283.23 2379.38 7.070 239.640 2310.08 2375.98 2473.81 12.170 244.540 2403.15 2469.05 2507.30 14.390 244.190 2435.74 2501.64 2536.90 15.760 243.380 2464.32 2530.22 Global Coordinates Northings Eastings (ft) (ft) 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.05 N 0.10W 5980549.89 N 618929.86 E 0.05 S 0.17W 5980549.79 N 618929.79 E 0.39 S 0.33W 5980549.45 N 618929.63 E 0.91S 0.52W 5980548.92 N 618929.46 E 1.46 S 0.43W 5980548.38 N 618929.55 E 1.83 S 0.10W 5980548.01N 618929.89 E 2.15 S 0.40 E 5980547.70 N 618930.39 E 2.36 S 0.78 E 5980547.49 N 618930.77 E 2.51S 1.15 E 5980547.35 N 618931.15 E 2.60 S 1.78 E 5980547.27 N 618931.78 E 2.72 S 2.55 E 5980547.17 N 618932.55 E 2.69 S 3.41E 5980547.21N 618933.41E 2.39 S 4.44 E 5980547.52 N 618934.44 E 1.83 S 6.00 E 5980548.10 N 618935.99 E 1.14 S 8.35 E 5980548.83 N 618938.33 E 0.48 S 10.92 E 5980549.53 N 618940.89 E 0.07 N 12.63 E 5980550.11N 618942.58 E 0.07 S 11.22 E 5980549.95 N 618941.18 E 1.76 S 4.50 E 5980548.15 N 618934.49 E 3.11 S 0.81W 5980546.71 N 618929.20 E 4.38 S 5.50W 5980545.37 N 618924.53 E 8.34 S 14.76W 5980541.27 N 618915.34 E 13.21 S 23.09W 5980536.26 N 618907.08 E 17.85 S 30.61W 5980531.51N 618899.64 E 22.63 S 37.82W 5980526.61N 618892.51E 27.91S 46.20W 5980521.20 N 618884.21E 35.13 S 60.21W 5980513.76 N 618870.3~ E 38.46 S 67.14W 5980510.32 N 618863,44 E 41.86 S 74.05W 5980506.81N 618856.59 E .~' Dogleg Rate (°/100fi) 0.05 0.29 0.15 0.29 0.37 0.09 0.19 0.31 0.29 0.08 0.11 0.21 0.25 0.51 0.62 0.41 0.72 3.42 4.2t 0.53 0.93 1.52 0.51 0.33 0.33 2.14 5.47 6.63 4.68 Alaska Drilling & Wells PBU WOA S Pad Vertical Section Comment 0.00 SURFACE AK-6 BP_IFR-AK 0.06 0.17 0.49 0.93 1.15 1.07 0.82 0.62 0.38 -0.10 -0.69 -1.42 -2.45 -4.07 -6.42 -8.95 -10.68 -9.41 -2.84 2.35 6.99 16.93 26.57 35.41 44.05 53.95 69.65 77.29 84.94 January, 200~ - 8:23 Page 2 of 6 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for S-213 Your Ref: AP1500292299300 Surveyed: 5 January, 2001 North Slope Alaska Measured Depth Sub-Sea Depth (ft) Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) 2566.89 17.560 242.480 2493.05 2558.95 2595.98 19.430 241.380 2520.64 2586.54 2632.15 19.930 240.840 2554.70 2620.60 2659.92 20.530 241.040 2580.76 2646.66 2691.00 21.450 241.150 2609.77 2675.67 2722.79 22.140 240.270 2639.29 2705.19 2753.99 23.210 238.460 2668.08 2733.98 2802.46 24.470 236.380 2712.41 2778.31 2860.62 26.470 236.450 2764.92 2830.82 2951.62 31.640 237.860 2844.44 2910.34 3040.77 35.990 239.460 2918.49 2984.39 3071.27 37.020 239.470 2943.01 3008.91 3131.05 40.750 239.670 2989.53 3055.43 3170.89 41.180 240.010 3019.62 3085.52 3231.38 44.400 241.890 3064.00 3129.90 3267.70 44.220 240.800 3089.99 3155.89 3326.51 44.600 240.330 3132.00 3197.90 3420.68 47.030 239.900 3197.63 3263.53 3516.80 46.670 239.970 3263.37 3329.27 3606.63 47.650 240.320 3324.45 3390.35 3699.98 47.420 242.700 3387.48 3453.38 3790.10 46.600 242.410 3448.93 3514.83 3884.87 48.460 241.810 3512.92 3578.82 3977.54 47.200 242.750 3575.13 3641.03 . 4073.70 46.390 239.940 3640.97 3706.87 45.78 S 81.70W 50.12 S 89.84W 56.01S 100.50W 60.67 S 108.90W 66.05 S 118.64W 71.83 S 128.94W 77.96 S 139.28W 88.52 S 155.78W 102.35 S 176.62W 126.27 S 213.76W 152.04 S 256.14W 161.25 S 271.77W 180.26 S 304.12W 193.38 S 326.70W 213.31S 362.63W 225.47 S 384.89W 245.70 S 420.73W 279.35 S 479.27W 314.48 S 539.96W 347.27 S 597.09W 380.11S 657.61W 410.50 S 716.11W 443.20 S 777.89W 475.15 S 838.68W 508.74 S 900.18W 5980502.77 N 618849.00 E 5980498.30 N 618840.93 E 5980492.24 N 618830.36 E 5980487.45 N 618822.04 E 5980481.91N 618812.38 E 5980475.97 N 618802.18 E 5980469.68 N 618791.93 E 5980458.86 N 618775.60 E 5980444.70 N 618754.99 E 5980420.19 N 618718.23 E 5980393.76 N 618676.27 E 5980384.29 N 618660.79 E 5980364.78 N 618628.74 E 5980351.30 N 618606.37 E 5980330.80 N 618570.77 E 5980318.28 N 618548.70 E 5980297.49 N 618513.18 E 5980262.92 N 618455.18 E 5980226.83 N 618395.06E 5980193.14 N 618338.46 E 5980159.33 N 618278.47 E 5980128.03 N 618220.46 E 5980094.35 N 618159,21E 5980061.44 N 618098.93 E 5980026.87 N 618037.97 E Dogleg Rate (°/100fi) 6.06 6.54 1.47 2.17 2.96 2.40 4.09 3.12 3.44 5.73 4.98 3.38 6.24 1.22 5.73 2.15 0.85 2.60 0.38 1.13 1.90 0.94 2.02 1.55 2.29 Alaska Drilling & Wells PBU WOA S Pad Vertical Section Comment 93.49 102.69 114.85 124.43 135.54 147.33 159.35 178.93 203.94 248.11 297.70 315.83 353.33 379.42 420.42 445.74 486.83 554.28 624.33 690.13 758.81 824.46 894.13 962.56 1032.47 AZ INTERPOLATED, CSG INTERFERENCE AZ INTERPOLATED, CSG INTERFERENCE January, 2001 - 8:23 Page 3 of 6 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for S-213 Your Ref: AP1 500292299300 Surveyed: 5 January, 2001 North Slope Alaska Measured Depth Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 4166.11 45.320 240.510 3705.33 3771.23 4260.49 47.760 238.440 3770.25 3836.15 4349.09 47.870 238.400 3829.74 3895.64 4441.63 49.170 237.100 3891.04 3956.94 4535.40 48.100 237.360 3953.00 4018.90 4629.75 46.600 238.490 4016.93 4082.83 4725.22 48.670 237.140 4081.26 4147.16 4815.66 48.060 239.050 4141.35 4207.25 4909.63 47.910 238.310 4204.25 4270.15' 5004.02 47.720 239.950 4267.63 4333.53 5097.71 47.000 241.020 4331.10 4397.00 5192.86 44.730 236.240 4397.37 4463.27 5286.71 42.670 235.790 4465.22 4531.12 5381.36 40.680 235.780 4535.91 4601.81 5474.62 38.490 234.380 4607.78 4673.68 5568.85 37.410 231.900 4682.09 4747.99 5662.89 35.490 229.870 4757.73 4823.63 5758.52 33.870 227.930 4836.37 4902.27 5852.29 30.300 224.790 4915.81 4981.71 5945.55 25.890 227.510 4998.07 5063.97 6040.45 21.720 225.030 5084.88 5150.78 6133.82 17.950 228.400 5172.70 5238.60 6227.97 16.630 230.300 5262.59 5328.49 6323.29 16.790 228.300 5353.89 5419.79 6417.89 17.040 227.290 5444.39 5510.29 6467.17 17.220 226.890 5491.49 5557.39 6520.00 17.220 226.890 5541.95 5607.85 Local Coordinates Northings Eastings (ft) (ft) - 541.68 S 957.74W 576.49 S 1016.72W 610.87 S 1072.65W 647.87 S 1131.28W 685.96 S 1190.45W 722.82 S 1249.25W 760.40 S 1308.93W 796.12 S 1366.31W 832.41S 1425.95W 868.30 S 1485.98W 902.25 S 1545.95W 937.73 S 1604.25W 973.97 S 1658.01W 1009.36 S 1710.05W 1043.36 S 1758.78W 1078.10 S 1805.15W 1113.32 S 1848.51W 1149.07 S 1889.52W 1183.38 S 1925.59W 1213.85 S 1957.20W 1240.27 S 1984.91W 1262.04 S 2007.90W 1280.28 S 2029.12W 1298.15 S 2049.89W 1316.64S 2070.28W 1326.52 S 2080.91W 1337.21S 2092.33W Global Coordinates Northings Eastings (ft) (ft) 5979993.03 N 617980.94 E 5979957.29 N 617922.52 E 5979922.02 N 617867.14 E 5979884.10 N 617809.11E 5979845.07 N 617750.55 E 5979807.28 N 617692.35 E 5979768.76 N 617633.26 E 5979732.13 N 617576.46 E 5979694.89 N 617517.40 E 5979658.06 N 617457.95 E 5979623.16 N 617398.53 E 5979586.76 N 617340.80 E 5979549.67 N 617287,62 E 5979513.46 N 617236.15 E 5979478.69 N 617187.96 E 5979443.22 N 617142.15 E 5979407,31N 617099.36 E 5979370.91N 617058.92 E 5979336.04N 617023.40 E 5979305.07 N 616992.28 E 5979278.22 N 616964.99 E 5979256.09 N 616942.35 E 5979237.51 N 616921.42 E 5979219.31 N 616900.94 E 5979200.50 N 616880.85 E 5979190.45 N 616870.37 E 5979179.58 N 616859.13 E Dogleg Rate (°/100ft) 1.24 3.04 0.13 1.76 1.16 1.82 2.41 1.72 0.61 1.30 1.14 4.32 2.22 2.10 2.54 1.98 2.41 2.05 4.20 4.92 4.52 4.22 1.52 0.63 0.41 0.44 0.00 Alaska Drilling & Wells PBU WOA $ Pad Vertical Section Comment 1098.70 1167.15 1232.80 1302.12 1372.49 1441.88 1512.41 1580.00 1649.80 1719.70 1788.52 1856.75 1921.57 1984.47 2O43,84 2101.62 2157.12 2210.93 2259.80 23O2.84 2340.42 2371.52 2399.21 2426.34 2453.48 2467.76 2483.13 PROJECTED SURVEY January, 200'1 - 8:23 Page 4 of 6 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for S.213 Your Ref: APl 500292299300 Surveyed: 5 J;nuary, 2001 North Slope Alaska Alaska Drilling & Wells PBU WOA $ Pad All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to S-213. Northings and Eastings are relative to $-213.' Magnetic Declination at Surface is 26.638° (28-Dec-00) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from S-213 and calculated along an Azimuth of 237.417° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 6520.00ft., The Bottom Hole Displacement is 2483.13ft., in the Direction of 237.417° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 0.00 0.00 0.00 N 0.00 E 2860.62 2830.82 102.35 S 176.62W 2951.62 2910.34 126.27 S 213.76W 6520.00 5607.85 1337.21 S 2092.33W Comment SURFACE AZ INTERPOLATED, CSG INTERFERENCE AZ INTERPOLATED, CSG INTERFERENCE PROJECTED SURVEY January, 200~ - 8:23 Page 5 of 6 DrillQuest 2.00.06 SPerry-Sun Drilling Services Survey Report for S-213 Your Ref: AP1 500292299300 ~urveyed: 5 J~nu~ry, 200'1 North Slope Alaska Alaska Drilling & Wells PBU WOA S Pad Survey tool program for S-213 From To Measured Vertical Measured Depth Depth Depth (ft) (ft) (ft) 0.00 0.00 6520.00 Vertical Depth (ft) 5607.85 Survey Tool Description AK-6 BP_IFR-AK f2 January, 200f - 8:23 Page 6 of 6 DrillQuest 2,00.06 North Slope Alaska Alaska Drilling & Wells PBU WOA S Pad, Slot S-2~3 S-2~3 MWD Surveyed: 5 January, 2001 S UR VEY REPORT January, 2001 .. Your Ref: AP1500292299300 Surface Coordinates: 5980549.84 N, 618929.96 E (70° 21' 19.7314" N, Kelly Bushing: 65.90ft above Mean Sea Level 149' 02' 03.0011" 140 DRILLING S~l~ I~VI CE 5 A Halliburton Company Survey Reft svyl0706 Sperry. Sun Drilling Services Survey Report for S-213 MWD Your Reft AP1500292299300 Surveyed: 5 January, 2001 North Slope Alaska Measured Depth (ft) Incl. Azim. 0.00 0.000 0.000 159.50 0.080 298.610 237.57 0.190 189.140 331.11 0.280 217.380 419.83 0.460 188.090 514.07 0.270 139.890 606.39 0.350 137.250 699.02 0.400 110.650 792.04 0.150 142.040 887.34 0.360 98.730 Sub-Sea Depth Vertical Local Coordinates Global Coordinates Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) -65.90 0.00 0.00 N 0.00E 93.60 159.50 0.05 N 0.10W 171.67 237.57 0.05 S 0.17W 265.21 331.11 0.38 S 0.33W 353.93 419.83 0.91S 0.51W 448.17 514.07 1.45 S 0.42W 540.48 606.38 1.83 S 0.09W 633.11 699.01 2.15 S 0.40 E 726.13 792.03 2.36 S 0.78 E 821.43 887.33 2.50 S 1.16 E 980.61 0.430 97.930 914.70 980.60 1073.24 0,530 98.080 1007.32 1073.22 1164.71 0.560 78.710 1098.79 1164.69 1257.43 0.770 70.570 1191.50 1257.40 1351.47 1.250 70.300 1285.53 1351.43 1443.61 1.800 76.000 1377.64 1443.54 1538.48 1.410 75.000 1472.47 1538.37 1634.08 0.740 67.120 1568.05 1633.95 1727.23 2.460 259.370 1661.18 1727.08 1818.21 6.280 254.680 1751.88 1817.78 1867.79 6.400 256.670 1911.45 6.400 253.110 2004.69 6.080 240.320 2099.24 5.640 239.010 2191.50 5.360 237.520 2.59 S 1.79 E 2.70 S 2.56 E 2.67 S 3.42 E 2.38 S 4.45 E 1.82 S 6.01 E 1.13 S 8.36 E 0.47 S 10.93 E 0.07 N 12.64 E 0.06 S 11.23 E 1.74 S 4.51 E 2286.10 5.130 235.180 2379.38 7.070 239.630 2473.81 12.170 244.640 2507.30 14.390 244.330 2536.90 15.760 243.460 1801.15 1867.05 3.09 S 0.80W 1844.54 1910.44 4.36 S 5.49W 1937.23 2003.13 8.31S 14.76W 2031.29 2097.19 13.19 S 23.09W 2123.13 2189.03 17.83 S 30.61W 2217.33 2283.23 22.62 S 37.81W 2310.08 2375,98 27.91S 46.19W 2403.15 2469.05 35.11 S 60.20W 2435.74 2501.64 38.43 S 67.15W 2464.32 2530.22 41.82 S 74.06W 5980549.84N 618929.96 5980549.89 N 618929.86 5980549.79 N 618929.79 5980549.45 N 618929.64 5980548.92 N 618929.46 5980548.38 N 618929.56 5980548.01N 618929.90 5980547.70 N 618930.40 5980547.49 N 618930.78 5980547.36 N 618931.16 5980547.27 N 618931.79 5980547.18 N 618932,56 5980547.22 N 618933.42 5980547.53 N 618934.45 5980548.11N 618936.00 5980548.84N 618938.34 5980549.54N 618940.90 5980550.11N 618942.60 5980549.96N 618941.19 5980548.17 N 618934.50 5980546.74 N 618929.21 5980545.39 N 618924.54 5980541.29 N 618915.34 5980536.29 N 618907.08 5980531.52 N 618899.64 5980526.62 N 618892.51 5980521.20 N 618884.22 5980513.78 N 618870.32 5980510,35 N 618863.43 5980506.85 N 618856.58 Dogleg Rate (°/'lOOft) 0.05 0.29 0.15 0.29 0.37 0.09 0.19 0.30 0.28 0.08 0.11 0.20 0.25 0.51 0.62 0.41 0.72 3.42 4.21 0,50 0.91 1.53 O.49 0.34 0,33 2.14 5.47 6.63 4.69 Alaska Drilling & Wells PBU_WOA S Pad Vertical Section Comment 0.00 0.05 0.17 0.48 0.92 1.13 1.05 0.81 0.60 0.36 -0.13 -0.72 -1.46 -2.49 -4.11 -6.46 -8.99 -10.72 -9.46 -2.88 2.33 6.97 16,91 26.56 35.4O 44.05 53.95 69.65 77.29 84.94 MWD Magnetic 12 January, 2001 - 8:44 Page 2 of 6 DrillQuest 2.00.06 Sperry-Sun DnTling Services Survey Report for S-213 MWD Your Ref: APl 500292299300 Surveyed: 5 January, 2001 North Slope Alaska Measured Depth (rt) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 2566.89 17.560 242.580 2493.05 2558.95 2595.98 19.430 241.550 2520.64 2586.54 2632.15 19.930 240.860 2554.70 2620.60 2659.92 20.530 241.190 2580.75 2646.65 2691.00 21.450 241.280 2609.77 2675.67 2722.79 22.140 240.410 2639.29 2705.19 2753.99 23.210 238.700 2668.08 2733.98 2802.46 24.470 236.450 2712.41 2778.31 2860.62 26.470 236.450 2764.92 2830.82 2951.62 31.640 237.860 2844.44 2910.34 3040.77 35.990 239.620 2918.49 2984.39 3071.27 37.020 239.730 2943.01 3008.91 3131.05 40.750 239.920 2989.53 3055.43 3170.89 41.180 240.310 3019.62 3085.52 3231.38 44.400 242.220 3064.00 3129.90 3267.70 44.220 241.140 3089.99 3155.89 3326.51 44.600 240.660 3132.00 3197.90 3420.68 47.030 240.240 3197.63 3263.53 3516.80 46.670 240,390 3263.37 3329.27 3606.63 47.640 240.650 3324.46 3390.36 Local Coordinates 3699.98 47.420 243.080 3790.10 46.600 242,840 3884.87 48.460 242.300 3977.54 47,200 243.160 4073.70 46.390 240.470 Northings Eastings (ft) (ft) 45.72 S 81.72W 50.05 S 89.87W 55.91S 100.54W 60.57 S 108.94W 65.92 S 118.70W 71.67 S 129.01W 77.77 S 139.37W 88.28 S 155.90W 102.10 S 176.75W 126.03S 213.88W 151.73 S 256.30 W 160.89 S 271.96 W 179.74 S 304.40 W 192.76 S 327.05 W 212.49 S 363.08 W 224.53 S 385.42W 244.54S 421.37W 277.85 S 480.11W 312.58 S 541.03W 344.99 S 598.37W 3387.49 3453.39 377.45 S 659.08W 3448.94 3514.84 407.42 S 717.80W 3512.93 3578.83 439.63 S 779.84W 3575.14 3641.04 471.10 S 640.88W 3640.98 3706.88 504.19 S 902.66W Global Coordinates Northings Easfings (ft) (ft) 5980502.83 N 618648.98 E 5980498.37 N 618840.90 E 5980492.34N 618830.32 E 5980487.55 N 618821.99 E 5980482.04 N 618812.32 E 5980476.13 N 618802.11E 5980469.87 N 618791.84E 5980459.09 N 618775.48 E 5980444.94 N 618754.86 E 5980420.43 N 618718.10 E 5980394.06 N 618676.10 E 5980384.66 N 618660.58 E 5980365.29 N 618628.45 E 5980351.91N 618606.01E 5980331.61N 618570.30 E 5980319.22 N 618548.16 E 5980298.64N 618512.52 E 5980264.41N 616454.32 E 5980228.71N 618393.96E 5980195.40 N 618337.14 E 5980161.97 N 618276.95 E 5980131.07 N 618218.72 E 5980097.89 N 618157.20 E 5980065.45 N 618096.66 E 5980031,38 N 618035.42 E Dogleg Rate (°/lOOft) 6.06 6.53 1.52 2.20 2.96 2,40 4.03 3.21 3.44 5.73 5.00 3.38 6.24 1.26 5.74 2.14 0.86 2.60 0.39 1.10 1.93 0.93 2.01 1.52 2.21 Alaska Drilling & Wells PBU WOA S Pad Vertical Section Comment 93.50 102.70 114.86 124.45 135.56 147,34 159.36 178.95 203.95 248.13 297.72 315.85 353.34 379.44 420.44 445.75 486.84 554.28 624.33 690.12 758.78 824.42 894.07 962.48 1032.38 AZ INTERPOLATED, CSG INTERFERENCE AZ INTERPOLATED, CSG INTERFERENCE 12 January, 2001 - 8:44 Page 3 of 6 DrillQuest 2.00,06 Sperry-Sun Drilling Services Survey Report for S.213 MWD Your Ref: AP1500292299300 Surveyed: 5 January, 2001 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 4166.11 45.320 241.130 3705.34 3771.24 4260.49 47.760 238.800 3770.26 3836.16 4349.09 47.870 238.670 3829.75 3895.65 4441.63 49.160 237.300 3891.06 3956.96 4535.40 48.100 237.700 3953.03 4018.93 4629.75 46.600 238.490 4016.95 4082.85 4725.22 48.670 237.170 4081.28 4147.18 4815.66 48.060 239.150 4141.37 4207.27 4909.63 47.910 238.750 4204.27 4270.17 5004.02 47.720 240.300 4267.66 4333.56 5097.71 47.000 241.470 4331.12 4397.02 5192.86 44.730 236.570 4397.40 4463.30 5286.71 42,670 236.180 4465.24 4531.14 5381.36 40.680 2361120 4535.94 4601.84 5474.62 38.490 234.620 4607.81 4673.71 5568.85 37.410 232.120 4682.11 4748.01 5662.89 35.490 230.130 4757.76 4823.66 5758.52 33.870 228.230 4836.40 4902.30 5852.29 30.310 225.020 4915.83 4981.73 5945.55 25.890 227.630 4998.08 5063.98 6040.45 21.720 225.130 5084.89 5150.79 6133.82 17.950 228.330 5172.71 5238.61 6227.97 16.630 230.360 5262.61 5328.51 6323.29 16.790 228.270 5353.90 5419.80 6417.89 17.030 227.160 5444.41 5510.31 6467.17 17.220 226.680 5491.51 5557.41 6520.00 17.220 226.680 5541.97 5607.87 Local Coordinates Northings Easfings (ft) (ft) Global Coordinates Northings Easfings (ft) (ft) 536.54 S 960.54W 5979998.12 N 617978.06E 570.85 S 1019.82W 5979962.87 N 617919.33 E 604.92 S 1075,93W 5979927.91N 617863.76 E 641.68 S 1134.71W 5979890.23 N 617805.58 E 679.49 S 1194.05W 5979851.48 N 617746.84E 716.17 S 1252.96W 5979813.87 N 617688.53 E 753.73 S 1312.66W 5979775.36 N 617629.43 E 789.39 S 1370.07W 5979738.80 N 617572.59 E 825.40 S 1429.88W 5979701.84 N 617513.36 E 860.87 S 1490.16W 5979665.42 N 617453.65 E 894.41S 1550.37W 5979630.93 N 617393.99 E 929.49 S 1608.90W 5979594.92 N 617336.01E 965.39 S 1662.89W 5979558.17 N 617282.60 E 1000.44S 1715.16W 5979522.29 N 617230.90 E 1034.20 S 1764.06W 5979487.77 N 617182.54E 1068.75 S 1810.57W 5979452.48 N 617136.59 E 1103.79 S 1854.07W 5979416.75 N 617093.65 E 1139.34S 1895.25W 5979380.55 N 617053.03 E 1173.49 S 1931.49W 5979345.84N 617017.34E 1203.86S 1963.20W 5979314.96N 616986.12 E 1230.23 S 1990.96W 5979288.16 N 616958.78 E 1251.99S 2013.96W 5979266.04N 616936.13 E 1270.23 $ 2035.18W 5979247.46 N 616915.20 E 1288.10 S 2055.96W 5979229.27 N 616894.71E 1306.61S 2076.31W 5979210.43 N 616874.65 E 1316.52 S 2086.91W 5979200.36 N 616864.21E 1327.25 S 2098.29W 5979189.45 N 616853.01E Dogleg Rate (°/'lOOft) 1.27 3.15 0.17 1.78 1.17 1.70 2.40 1.77 0,35 1.23 1.20 4.40 2.21 2.10 2.56 1.99 2.40 2.04 4.21 4.92 4.52 4.20 1.54 0.65 0.43 0.48 0.00 Alaska Drilling & Wells PBU WOA $ Pad Vertical Section Comment 1098.59 1167.03 1232.67 1301.99 1372.36 1441.75 1512.28 1579.87 1649.67 1719.57 1788,38 1856.60 1921.42 1984.33 2043.70 2101.48 2156.97 2210.78 2259.66 2302.70 2340.25 2371.33 2399.00 2426.11 2453,21 2467.47 2482.82 PROJECTED SURVEY 12 January, 2001 - 8:44 Page 4 of 6 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for S.2'13 MWD Your Ref: APl 500292299300 Surveyed: 5 January, 2001 North Slope Alaska All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to S-213. Northings and Eastings are relative to S-213. Magnetic Declination at Surface is 26.638° (28-Dec-00) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from S-213 and calculated along an Azimuth of 237.685° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 6520.00ft., The Bottom Hole Displacement is 2482.82ft., in the Direction of 237.685° (True). Alaska Drilling & Wells PBU WOA S Pad Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 2860.62 2830.82 102.10 S 176.75 W 2951.62 2910.34 126.03 S 213.88 W 6520.00 5607.87 1327.25 S 2098.29 W Comment AZ INTERPOLATED, CSG INTERFERENCE AZ INTERPOLATED, CSG INTERFERENCE PROJECTED SURVEY f2 January, 200f - 8:44 Page 5 of 6 DrillQuest 2.00.06 Sperry-Sun Drilling Services Survey Report for S-213 MVtlD Your Ref: AP1500292299300 Surveyed: 5 January, 2001 North Slope Alaska Alaska Drilling & Wells PBU WOA S Pad Survey tool program for S-213 MWD From To Measured Vertical Measured Depth Depth Depth (ft) (ft) (ft) 0.00 0.00 6520.00 Vertical Depth (ft) 5607.87 Survey Tool Description MWD Magnetic DrillQuest 2.00.06 January, 200~ - 8:44 Page 6 of 6 ,. / TONY KNOWLE$, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Dan Stone Senior Drilling Engineer 'BP 'Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re~ Prudhoe Bay Unit S-213 BP Exploration (Alaska) Inc. Permit No: 200-205 Sur Loc: 4347'NSL, 4501'WEL, Sec. 35, T12N, R12E, UM Btmhole Loc. 3058'NSL, 1291'WEL, Sec. 34, T12N, RI2E, UM Dear Mr. Stone: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. According to the rules provided in our letter of November 30, 2000, your request for an exception to the Diverter requirements of 20 AAC 235.035(c) is granted. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the CommiSsion to witness a test of BO?E installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. · Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~ / 5-~ day of December, 2000 dlfAEnclosures Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. .~ STATE OF ALASKA ALAS~, OIL AND GAS CONSERVATION COMIvilSSION PERMIT TO DRILL 20 AAC 25.005 [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [][] Re-EntryDrill [][] DeepenRedrill lb. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone ,2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 64.4' Prudhoe Bay Field / Polaris ;3. Address 6. Property Designation Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ,;'Z.~2.,.CT,~-zA,,._DL 028258 4. Location of well at surface ~7. Unit or""'l~perty Name 11. Type Bond (See 20 AAC 25.025) 4347' NSL, 4501' WEL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 3220' NSL, 1114' WEL, SEC. 34, T12N, R12E, UM S-213 Number 2S100302630-277 At total depth 9. Approximate spud date 3058' NSL, 1291' WEL, SEC. 34, T12N, R12E, UM 12/21/00 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028257, 1291' MDI S-200 is 32.7' away at 1400' MD 2560 6500' MD / 5571' TVD 16. TO be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 2100' MD Maximum Hole Angle 48 o Maximum surface 1748 psig, At total depth (TVD) 5270' / 2275 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casin,q Weight Grade Couplin,q Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface Surface 109' 109' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-M 2831' Surface Surface 2860' 2836' 415 sx Articset Lite 3, 213 sx CI 'G' 8-3/4" 7" 26# L-80 BTC-M 6471' Surface Surface 6500' 5571' 339 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate LPirn°edructiOn J~ ~ C E IV E D DEC 04 2000 Alaska Oil & Gas Cons. C0mm/ssior Perforation depth: measured Anchorage true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Phil Smith, 564-4897 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge ! 1 Signed Dan Stone ~.~..,.., ;,,.~, ¢..~======:=~ Title Senior Drilling Engineer Date !,5!"1 I Permit Number ~J, API Numb_er I A ~r~° v"a~)r'"eo ISee c°ver letter :2-~"..."-2~"~'~ 2~:~- 150- O 2___.~'/- ~_2-~"~'~)' ~.~ -~<~"-~ ~ for other requirements Conditions of Approval: Samples Required [] Yes [] No Mud Log Required [] Yes [] No Hydrogen Sulfide Measures I~Yes [] No Directional Survey Required [] Yes [] No Required Working Pressure for DOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K [] 3.5K psi for CTU ~ by oraer of Approved By ORIGINAL. SK,:;i',~I:.L.' t.:,~, /d:~ -'c~ /'"' ¢~ ~ 'r' ..... ,..~.." ~,¢~mr', ~m' Commissioner the commission Date :orm10-401 Rev. 12-01-85D G t LI A L Submit In Triplicate To: Blair Wondzell, AOGCC Date: December 4, 2000 From: Phil Smith Subject: Dispensation for 20 AAC 25.035 (c) on Polaris S-213 BP Alaska Drilling and Wells requests your consideration of a waiver of the diverter system identified in 20 AAC 25.035 (c) "Secondary Well Control for Primary Drilling and Completion: Blowout Prevention Equipment and Diverter Requirements". Experience and data gathered, summarized herein, supports rationale of the request. To date, none of the 40-plus Ivishak wells at S-pad, nor the recent six Aurora/Polaris wells have experienced pressure control or shallow gas problems above the surface casing depth, apart from minor and inconsequential hydrate shows. The first six surface holes for the Aurora/Polaris development were drilled no deeper than the shale underlying the SV-1 sands; S-213 is planned to TD in the shallower SV-3 shale, as did the most recent three wells. The shale underlying the SV 1 is the deepest planned surface casing setting depth for future pad development wells. This casing point is +500' TVD above the Ugnu horizon. The shallowest RFT point recorded in the area is from SB-01, recording a pore pressure of 1,555 psi at 3,195' TVDss (9.36 ppg EMW). S-213 is planned to reach 9.6 ppg mud weight before TD at 2,770' TVDss. This planned mud weight, and the aforementioned RFT data, is plotted on the attached chart. Supporting surface hole gas detection information is on file with the AOGCC from recently drilled S-105. Your consideration of the waiver is appreciated. Sincerely, Phil G. Smith ADW Engineer 564-4897 DEC 04 2000 Alaska Oil & Gas Cons. Commissior Anchorage 0 5OO 1000 500 2000 2500 3000 3500 4000 Aurora/Polaris Surface Hole Mud Weight MW (ppg) 8 8.5 9 9.5 10 -.-e- S-100 \ · --a--- S-101 · -~- S-102 -- '" S-105 ---e- S-103 ~ S-201 ~ Pore Pressure ~ S-213 Plan I PGS 11/30/2000 S-213 Drilling Permit ECEIVED I Well Name: IS-213 O~c o~ ~ooo · 41aSka Oi/& Gas Cons. Drill and Compioto Plan Summary ~"~or~o Co~.~o~ I Type of Well (service / producer ! injector): I Producer Surface Location: Target Location: Schrader Bluff "O" sands Bottom Hole Location: X = 618,929.96 Y = 5,980,549.84 4347' FSL 4501' FEL S35 T12N R12E X = 617,055.00 Y = 5,979,395.00 3220' FSL 1114' FEL S34, T12N, R12E X = 617,545.70 Y = 5,975,314.81 3058' FSL 1291' FEL S34, T12N, R12E Umiat Umiat Umiat I AFE Number: 15M1009 I I Estimated Start Date:112/21/2000 I~D= 16,500' I I TVD: 15,571' I Ri~l: I Nabors 9ES I Operatin~l days to complete: 113.0 I BF/MS' 135.9' I I RKB: 164.4' I Well Design (conventional, slimhole, etc.): I Ultra Slimhole Longstring I Objective: I Schrader Bluff Formation (Target zones O sands) Mud Program: 12-1/4" Surface Hole (0-2860'): Fresh Water Surface Hole Mud Interval Density Visco'sity YP PV Gel-10 Fluid (ppg) (seconds) sec Loss Initial 8.5-9.1 300 75 22-25 19/55 NC Interval TD 9.1-9.6 65 20-25 12-19 12/25 <10 8-3/4" Intermediate / Production hole (2860' - 6500'): Freshwater LSND Interval Density Viscosity YP PV pH APl HTHP (ppg) (seconds) Filtrate Filtrate Surface 10.5 42-52 18-27 10-19 9.0-9.5 6cc to <10 by shoe to TD <5 target Directional'. KOP: 1 2100' Maximum Hole Angle: 48° at 3255' MD Close Approach Wells: S-200 = 32.7' center-center (11.8' allowable deviation from plan), S-216 plan - 31.3' center-center (22.6' allowable deviation). Both wells pass major risk criteria and proximity issues will be re-addressed and mitigated after drilling S-216. s-213 Permit to Drill Page I Logging Program: Surface Intermediate ! Production Hole Drilling: MWD / GR Open Hole: None Cased Hole: None R£CE V£D DEC 04 000 AIBsk~ Oil & G~s Gons. Gommissio~ A.n. ch0r~e Drilling: MWD / GR / Res Open Hole: RFT w/ samples, PEX (GFFAIT/Neu/Den/Compress. Sonic) Cased Hole: USIT cement evaluation Formation Markers: Formation Tops MDbkb TVDss Estimated pore pressure, PPG Base Permafrost 1966 1900 8.60 SV5 2181 2115 8.64 SV4 2387 2320 8.62 SV3 2750 2670 8.64 SV2 2929 2830 8.63 ~'~..~ "~'~ r -,. ,%~ SVl 3374 3160 9.43 ~ ,~, v ,~ ~ .... UG4 3925 3530 9.26 UG4A 3992 3575 10.44 UG3 4475 3900 8.97 UG1 4996 4250 8.73 Top U9nu Ma sand 5576 4660 8.52 Mb1 5638 4710 8.49 Mb2 5699 4760 8.48 Mc/WS2/Top 5735 Schrader Bluff 4790 8.49 Na 5828 4870 8.41 Nb 5852 4890 8.40 Nc 5874 4910 8.44 Top OA sand / WS1 5964 4990 8.38 OBa 6018 5040 8.38 OBb 6061 5080 8.35 OBc 6104 5120 8.34 OBd 6167 5180 8.32 OBe 6220 5230 8.31 Obf 6261 5270 8.30 Obf Base 6302 5310 8.29 TD 6500 5510 8.20 S-213 Permit to Drill Page 2 Casin! I/Tubinq Proqram: Hole Csg! Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD bkb 30" 20" 91.5# H-40 WLD 80' GL 109/109 12-1/4" 9-5/8" 40# L-80 BTC-M 2831' GL 2860'/2836' 8-3/4" 7" 26# L-80 BTC-M 6471' GL 6500'/5571' Tubing 3-1/2" 9.3# L-80 NSCT -5496' GL 5525'/4687' Cement Calculations: The following surface cement calculations are based upon a single stage job using a port collar as contingency if cement is not circulated to surface. Casin.~ Size 19-5/8" Surface Basis: Lead: Based on 2000' of annulus in the permafrost @ 175% excess and 370' of open hole from top of tail slurry to base permafrost @ 30% excess. Lead TOC: To surface Tail: Based on 500' TVD open hole volume + 30% excess + 80' shoe track volume. Tail TOC: At -2335' MD (2335' TVDbkb). ITotal Cement Volume: Lead 1 328 bbl/1842 ft~ / 415 sks of Dowell ARTICSET Lite 3 at 10.7 ppg and 4.44 cf/sk. Tail 44 bbl / 247 ft~ / 213 sks of Dowell Premium 'G' at 15.8 ppg and 1.16 cf/sk. Casinc. Size 17" Intermediate Longstring Basis' Lead: N/A Lead TOC: N/A Tail: Based on TOC 500' above top of Ugnu formation and 30% excess + shoe Tail TOC: 4575' MD, 4033' TVDbkb I Total Cement Volume: I Lead I Tail I 70 bbls / 393 ftc/339 sks of Dowell Premium 'G' at 15.8 I ppg and 1.16 cf/sk. RECEIVED DEC 04 2000 Alaska Oil & Gas Cons. Commission Anchorage S-213 Permit to Drill Page 3 Well Control: Surface hole is requested to be drilled without diverter, reference Commissioners Taylor and Heusser's letter to Dan Stone, 11/30/00 and updated supporting mud weight plot and cover letter submitted with the permit request. For intermediate hole drilling, well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below BOP equipment will be tested to 3500 psi Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Interval- · Maximum anticipated BHP: 2275 psi @ 5270' TVDss- Schrader OBf Sands · Maximum surface pressure: 1748 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/fO · Planned BOPtest pressure: · Planned completion fluid: 3500 psi (required for casing test) 8.6 ppg seawater / 6.8 ppg Diesel RECEIVED Drilling Hazards/Contingencies: (See also hazards identified following the Procedure Summary) HYDROGEN SULFIDE - H2S DEC 04 2000 Alaska Oil & Gas Cons. Commissior, Anchorage · S-Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. The highest level of H2S recently measured on S-pad in the last 12 months was on S-32 (130 ppm in January 2000) · The closest wells to S-213 are S-200 and S-44. Both measured 10 ppm at the last test in August, 2000. "-'------~ %~,,~-~ ~ ~ t \ I DRILLING CLOSE APPROACH: The closest wells to the S-213 planned trajectory are S-100, S-102, and S-216 (planned). These three wells all have a minimum No-Go area between 5 and 10' in the upper section of the surface hole. The least allowable deviation is with S-200 at 1400 MD (11.8' allowable). All wells pass the major risk criteria. Surface gyros will be run as required to ensure adequate separation between wells. Disposal: · No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04, · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for injection. Haul all Class I wastes to Pad 3 for disposal. S-213 Permit to Drill Page 4 DRILL AND COMPLETE PROCEDURE SUMMARY Pre-Rig Work: The 20" conductor is in place. 1. Weld an FMC landing ring for the FMC Ultra slimhole wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. 3. Ensure any required plugs and / or well shut-ins have been accomplished in nearby wells for rig move and close approach concerns. Rig 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. Operations: MIRU Nabors 9ES. Nipple up diverter spool (with blinded outlet) and riser. PU 4" DP as required and stand back in derrick. MU 12 ~,4" drilling assembly and drill surface hole to +/-100' TVD below the SV3 sand top (30' below the sand base). Run and cement the 9 5/8", 40# surface casing back to surface. A TAM port collar will be positioned at +_1000' as contingency in the event cement does no fully circulate to surface. ND diverter spool and riser and NU casing / tubing head. NU BOPE and test to 3500 psi. MU 8 3,4" drilling assembly and RIH to float collar. Test the 9 5/8" casing to 3500 psi for 30 minutes. Drill out shoe joints and displace well to LSND drilling fluid. Drill new formation to 20' below 9-5/8" shoe and perform a FIT to 12.5 ppg EMW. Drill per directional plan to top of the Ugnu Ma sand and treat the mud system to minimize formation damage. Continue drilling 8 3/~,, hole to 200' below the base of the Schrader OBf sands. Run openhole logs and RFT Icg with samples at locations provided by the Geologist. Expect _+40 pressures + fluid samples. Run a wiper trip with dumb iron as required by hole conditions. Run 7" 26#/ft long string casing to TD and cement to 1000' MD above the Ugnu Ma formation, set on mandrel hanger. Displace cement with clean Seawater. Bump plug to 3500 psi, check floats. Freeze protect 7" x 9-5/8" annulus with dead crude to 2000' TVD by bullheading down the surface X Iongstring annulus. If WOC time is required (12 hrs minimum) RIH with 6" cleanout assembly to landing collar and circulate the well to clean seawater. Test casing to 3500 psi. RU Schlumberger, run USIT cement evaluation Icg from PBTD to surface casing shoe. RU appropriately to run the Icg under pressure (1500 psig) as recommended if the Icg is sensitive to micro-annuli. Run 3-1/2", 9.3# L-80 completion string with a single joint of 4-1/2" tubing below the tubing hanger. Reverse circulate the well to clean, inhibited seawater, followed by sufficient diesel to freeze protect the tubing and annulus to 2100' after U-tubing. Install two-way check and test to 3500 psi. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull the TWC U-tube the diesel to freeze protect tubing and annulus with 2100'. Drop setting ball and rod, set production packer and test tubing and annulus to 3500 psi. Install BPV. Secure the well and rig down / move off 9ES. Estimated Spud Date: 12/21/2OOO Phil G. Smith Shared Services Drilling 564-4897 smithpgl@BP.com RECEIVED DEC 04 2000 A/aska Oil & Gas Cons. Commission /l~ch0rage S-213 Permit to Drill Page 5 Job 1: MIRU Hazards and Contingencies ~ Well S-200 is located 15' south of planned well center. Confirm that the well has been shut in and depressurized (including annuli and header lines) prior to moving the rig. Reference RPs *:o "Drilling/Workover Close Proximity Surface and Subsurface Wells Procedure" Operational Specifics Job 2: Drillinq Surface Hole Hazards and Contingencies ~ A close approach has been identified with well S-200 in the upper section of the surface hole. Though the directional plan passes the major risk criteria, it does not allow much room for error. Refer to the close approach data in the directional plan for details and to the RPs for roles and responsibilities with respect to close approach drilling. No faults are expected to be penetrated by S-213 in either the target polygon or in the build/tangent section through the overlying section. However, S-213 is in close proximity to a fault over a long interval from the point where the well begins to build angle (2100' MD, -2034' tvdss) in the SV5 to near the top of the Ma sand at 5600' MD (- 4679' tvdss). This fault trends north-south and dips to the west - the well is 100'-300' east of the fault over this interval (upthrown) and has an inclination approximately paralleling the fault. This fault has 50'-80' of throw. All sides of the polygon are considered to be 'hardlines' due to the presence of nearby faults. The SV4 sand may contain gas hydrates, though little or none have been encountered thus far in the recent S-pad development. Hydrate will be treated at surface with appropriate mud products. Produced water injection has over-pressured the SV3/Cretaceous zone. Well S-40 required 9.3 ppg mud to drill this interval in 1994, though several wells have been drilled through the interval without incident since then. Reference RPs Operational Specifics RECEIVED DEC 04 2000 Alaska Oil & Gas Cons. Commission Anchorage Job 3: Install surface Casinq Hazards and Contingencies ~ It is critical that cement is circulated to surface for well integrity. 175% excess cement through the permafrost zone (and 30% excess below the permafrost) is planned. As a contingency, a 9-5/8" port collar will be positioned at _+1000'MD to allow a seconday circulation as required. S-213 Permit to Drill Page 6 Reference RPs Operational Specifics Job 4: Drillinq Intermediate/Production Hole Hazards and Contingencies ~ The fault referred to in the surface hole section continues parallel with the well trajectory to TD. The large fault (50-80' throw) lies 350' northwest of the northwest side of the polygon at the target depth (and dips away). A fault with 20-30' of throw lies 575' northeast of the northeastern side of the target polygon (and dips away from the target). ~ The surface casing point is chosen just below the SV3 sands, leaving the SV1 exposed for the 8-3/4" hole. The first three Aurora wells covered the SV1 sand with the surface casing to mitigate differential sticking hazards across the sand. With TD above the HRZ, a lower mud weight will be require, thus minimizing the risk of differential sticking. Reference RPs Operational Specifics Job 5: Logging Production Hole Hazards and Contingencies ~ Continue best practices for well control during openhole wireline logging operations. Monitor continuously for signs of a kick, especially while logging up and POH with wireline. Reference RPs RECEIVED Operational Specifics DEC 04 2000 Alaska 0il & Gas Cons. Commissior~ Anchorage Job 6: Install Lonflstrinfl Casin.q Hazards and Contingencies ~ All Aurora S-Pad wells drilled this year have contained oil at the top of the Ugnu. For this reason the 7" casing will be cemented to 1000' above the Ugnu Ma sand (the uppermost significant hydrocarbon). After freeze protecting the 7" x 9-5/8" casing annulus with dead crude, the hydrostatic pressure alone may be less than the formation pressure. Ensure a double-barrier at the surface on the annulus exists until the cement has set up for at least 12 hours. Expect trapped annulus pressure after pumping the dead crude. S-213 Permit to Drill Page 7 Reference RPs Operational Specifics Job 7: Run Completion Hazards and Contingencies Y No hazards specific to this well have been identified for this phase of the well construction. Reference RPs Operational Specifics Job 8: ND/NU/Release Ri.q Hazards and Contingencies ~ No hazards specific to this well have been identified for this phase of the well construction. Reference RPs Operational Specifics RECEIVED DEC 04 2000 41aska Oil & Gas Cons. Commission Anchorage S-213 Permit to Drill Page 8 TREE =. 4" 5000 psi WELLHEAD= FMC 11" .ACTUATOR= ....... KB. ELEV = 64.4 BF. ELEv= 35.9 KoP= 300 "Max Angle= @3'000; ;Datum MD= 61i'0 bkb; Datum TVD= 5125 SS 5/8" 40# L-80 I I 2860' S-213 70' 2100' ,il'I I SAFETY NOTES XO4-1/2"X3-1/2" I Nipple, 2.813" ID I GAS LIFT MANDRELS TYPE Minimum ID = 2.813" I 3-1/2" 9.3# L-80 I I 552,5' -- 5425' 5450' 15500' 5525' X Nipple, 2.813" ID IBaker S-3 Packer [ X Nipple, 2.813" ID I X Nipple, 2.813" ID PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: I I Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE I~ I I 642o' I I ,''~#"-~°mBTc I I 65oo' i ~ I £C£1vEb bEC o,~ 2Ooo 0ii ~ C, as Cons. Anchorage Commission DATE REV BY COMMENTS 12/01/00 PGS Original Proposed Completion PRUDHOE BaY UNIT/POLARIS FIELD WELL: S-213 PERMIT No: APl No: Sec. 35, T12N, R12E, 4501' FEL, 4347' FSL BP Exploration (Alaska) INorth Slope Alaska DRILLING SEFIVICEiec ,,.,,.~,.., Alaska Drilling l Wells PBU_WOA S Pad S-213 Wp04 I DrillQuestTM Proposal Data for S-213WP4 Vertical Odgln: F_,q3 Slot 02 Hodzontal Origin: Exp Slot 02 MeasurementUnils: North Reference: True Norgt severity: Degrees per 100 feet veD~al ,~n Azimulh: 238.126° Vertical Section Deecr~ Exp Slot 02 Vattbal Section Origin: 0.00 N,0.00 E Dlpth Depth Section 0.00 0.000 0.910 0.00 0.00 N 0.00 E 0.00 65.75 0.000 0.910 65.75 0.00 N 0.00 E 0.00 {).IX) 600.00 0.000 0.910 600.00 0.(]0 N 0.00 E 0.00 0.00 2100.00 0.000 0.910 2100.00 0.00 N 0.00 E 0.~0 0.00 2600.00 15.000 240.000 2594.31 32.54 S 56.36 W 65.04 3.00 3255.61 47.780 240.047 3146.36 200.78 $ 348.17 W 401.70 5.00 5254.23 47.780 240.047 4489.39 939.79 S 1630.60 W 1880.98 0.00 5758.77 32.000 227.460 4875.91 1124,92 S 1893.05 W 2201.62 3.50 6302.40 12,973 227.460 5375.91 1264.85 S 2045.54 W 2405,01 3,50 6500.00 6.057 227.460 5570.67 1286.92 S 2069.60 W 2437.09 3.50 8OO 1600 Single Well Target Data for S-213 Wp4 Measurement Units: ft Coordinate Target Point TVD TVD Northings Eaetinge Northlngs Eastlngs Target Name Type Shape S-213 Target Entry Point 4875.90 4810.00 5979395.00 N 617055.00 E 1124.93 S 1893.06 W Polygon Boundary P~mA 4875.90 4810.00 5979590.00 N 617020.00 E 929.40 S 1924.96W B 4875.90 4810.00 5979335.00N 617235.00E 1187.78 S 1714.03W C 4875.90 4810.00 5979110.00N 616990.00E 1408.86S 1962.57W D 4875.90 4810.00 5979375.00N 616775.00E 1140.48 S 2173.34W .c:2400 3200 9 5/8" Casing 2860.23 MD 2835.90 TVD End DIr, ~tlr~ Bell 0 47.780°: 3~.61ftMD, a14~.36ftTVD SWi/.e'S'I:IF ~it U I t ~-S.V 'l } 2 ~]''O -- -- · -JI~Clr Current Well Properties Wall: S-213 Wp4 Horizontal Coordinates: Ref. Global Coordinates: 5980549.84 N, 618929.96 E Ref. Structure Reference: 322.44 S, 1008.25 E Ref. Geographical Coordinates: 70° 21' 19.M89" N, 149° 02' 02.9593" RKB Elevation: 65.90ft above Mean Sea Level 65.90ft above Structure Reference North Reference: True North Units: Feet 4000 I,'GJA 3~40,~)0' TVI) S-Wt~,~S'URaLI~'I: {UG:3) 4 4800 5600 Begin DIr · 3.50'1100tt : 5254,23ft MD, 4489.aeft TVD S-213 'Tar,c Tetal D~pth: 6M)0.0OItMD,~70.6?ItTVD 6500.00 MD 5570.67 TVD I I I 0 800 1600 2400 Scale: 1 inch = 800fi Section Azimuth: 238.126° (True North) Vertical Section ~l=~--~J-~l-~.I North Slope Alaska =.,-L,.= *'~'"~~I Alaska Drilling & Wells PBU_WOA S Pad S-213 Wp4 I DrillQuestTM Proposal Data for S-213WP4 Vertical OriOn: Enp 8~ot 02 ~ Origin: Exp SIo{ 02 ~ Unts: It North Reference: Tn~ North Ve~'ical Se~ion AzJmMh: 238.126= VerlicaJ Section Origin: 0.00 N.0.00 E 0.00 0.000 0.910 0.00 0.00 N 0.00 E 0.00 65.75 0.000 0.910 65.75 0.(X) N 0.(X) £ 0.00 0.00 600.00 0.000 0.910 600.00 0.00 N 0.00 E 0.00 0.00 2100.(~ 0.000 0.910 2100.00 0.00 N 0.00 E 0.00 0.00 26~0.00 15.000 240.00~ 2594.31 32.54 S 5636 W 65.04 3.00 3255.61 47.780 240.047 314636 200.78 S :M8.17 W 401.70 5.00 5254.23 47.780 240.047 448939 939.79 S 16~0.60 W 1880.9~ 0.00 5758.77 32.0~0 227.4~ 4875.91 I 124.92 S 1993.05 W 2201.62 3.50 6302.40 12.973 227.460 5375.91 1264.85 S 2045.54 W 2405.01 3.50 6500.00 6.057 22?.460 5570.67 1286.92 S 2069.60 W 2437.09 3.50 Single Well Target Data for S-213 Wp4 Measurement Units :ft Coordinate Target Point TVD 'rVD Northings Eastings Northings Eastings Target Name Type Shape S-213 Target Entry Point 4875.90 4810.00 5979395.00 N 617055.00 E 1124.93 S 1893.06 W Polygon Boundary Point A 4875.90 4810.00 5979590.00 N 617020.00 E 929.40 S 1924.96 W B 4875.90 4810.00 5979335.00N 617235.00E 1187.78 S 1714.03 W C 4875.90 4810.00 5979110.00 N 616990.00 E 1408.86 S 1962.57 W D 4875.90 4810.00 5979375.00N 616775.00E 1140.488 2173.34W -2000 -1600 -1200 -800 -400 0 Dh' F~e Increase (~ End Db', Start Sail (~ 47.780°: 3255.61ftMD,3146.36{ITVD \ ~ . ~ ~ 2860.23' MO Bec~n Dk' ~ 3.50~/liX~t : 5~=~...23~ MD, 4489. I I I I I -2000 -1600 -1200 -800 -400 0 Scale: linch = 400ft Eastings Reference is True North Curre~t Well Propeflle~ Weg: HorizontaJ Coordinates: Ref. Gbbal Coordinates: Ref. Strucltxe Re~e~ence: Ref. GeographicaJ Coordinates: RKB Elevation: North Refe~m~ce: U~s: S-215 Wp4 5980549.84 N. 618929.96 E 322.44 S, 1000.25 E 7(P 21' 19.8489' N, 149= 02' 02.9593' W 65.9(XI above Mean Sea Level 65.gOfl above Stmm't~e Re~erence Spe, , y-Sun Drilling Services Proposal Data- Exp Slot 03 (S-104 As-built)- S-213WP04 (~)000 (ft) (ft)' (ft} (/lOOff)'(,) (fi) MD (ft) (°) '1 0.00! ', ' 0.000 . 0.00 0.00 0.00 ; ' 2 65.75 65.75 0.000 0.000 65.75 0.00 0.00 0.000 0.000 J 3 600.00 534.25 0.000 , 0.0001 600.00 0.00 · ,' 0.00 ' , 0.000"' ':' 0'000! I 4 2100.00 1500.00 0.000 o.O00i 2100.00 0.00 0.00 0.000 0.000 5 2600.00 500.00 15.000 240.000 2594.31 i 32.54 S 56.36 W ' 3.000 ' ~40.000 3255:61 655.61 47.780 .240.047 · 3146.36. :.200.78 S 348.17W 5.000 0.064 5254.23 1998.62 47.780 240.047 4489,39 939:79 S 1630;60 W 0.000 0,000 5758.77 504.54 32.000 227.460 4875.91 1124.92 S 1893.05 W 3.500 202.377 6302.~,0 :'~;~l 12.973 227.460 5375:911.1'~t~S:1 ~,.54. Wt .'3:~1, ,1',~ 1° t 65°°'°°I~97.',~1 6'°571227'46°i 5ST°-S7/'~2ss-92s'l 2°c°a-s°wl,,,3',s°O,J ,,,~,a°'°°°l O£c o4 ooo Orage C°~?is~ior 30 November, 2000- 14:08 - 1 - DriilQuest Sperry-Sun Drilling Services Proposal Report for S-213 Exp Slot 03 - S-213WP04 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 0.00 0.000 0.0(X) -65.90 0.00 65.75 0.000 0.000 -0.15 65.75 100.00 0.000 0.000 34.10 100.00 200.00 0.000 0.000 1 34.10 200.00 300.00 0.000 0.000 234.10 300.00 400.00 0.000 0.000 334.10 400.00 500.00 0.000 0.000 434.10 500.00 600.00 0.000 0.000 534.10 600.00 700.00 0.000 0.000 634.10 700.00 800.00 0.000 0,000 734.10 800.00 900.00 0.000 0.000 834.10 900.00 1000.00 0.000 0.000 934.10 1000.00 1100.00 0.000 0.000 1034.10 1100.00 1200.00 0.000 0.000 1134.10 1200.00 1300.00 0.000 0.000 1234.10 1300.00 1400.00 0.000 0.000 1334.10 1400.00 1500.00 0.000 0.000 1434.10 1500.00 1600.00 0.000 0.000 1534.10 1600.00 1700.00 0.000 0.000 1634.10 1700.00 1800.00 0.000 0.000 1734.10 1800.00 1900.00 0.000 0.000 1834.10 1900.00 1965.90 0.000 0.000 1900.00 1965.90 2000.00 0.000 0.000 1934.10 2000.00 2100.00 0.000 0,0(X) 2034.10 2100.00 2180.93 2.428 240.000 2115.00 2180.90 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.98 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549,84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.98 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929.96 E 0.00 N 0.00 E 5980549.84 N 618929,96 E 0.86 S 1.48 W 5980548.98 N 618928.49 E Dogleg Rate (O/lOOft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 Alaska Drilling & Wells PBU_WOA S Pad Vertical Section Comment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 1.71 Base Permafrost Begin Dir @ 3,00°/100ft · 2100.00ft MD, 2100.00ft TVD SV5 Continued... 30 November, 2000 - 17:41 - 1 - DrillQuest 2.00.05 North Slope Alaska Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 2200.00 3.000 2ZK).000 2134.05 2199.95 2300.00 6.000 240.O00 2233.73 2299.63 2386.98 8.609 240.000 2320.00 2385.90 2400.00 9.000 240.000 2332.87 2398.77 2500.00 12.000 240.000 2431.18 2497.08 2600.00 15.000 240.000 2528.41 2594.31 2700.00 20.000 240.016 2623.75 2689.65 2749.63 22.481 240.022 2670.00 2735.90 2800.00 25.000 240.026 2716.11 2782.01 2860.23 28.011 240.031 2770.00 2835.90 2900.00 30.000 240.033 2804.78 2870.68 2929.34 31.487 240.035 2830.00 2895.90 3000.00 35.000 240.038 2889.09 2954.99 3100.00 40.000 240.042 2968.40 3034.30 3200.00 45.000 240.045 3042.11 3108.01 3255.61 47.780 240.047 3080.46 3146.36 Sperry-Sun Drilling Services Proposal Report for S-213 Exp Slot 03 - S-213WP04 3300.00 47.780 240.047 3110.29 3176.19 3373.98 47.780 240.047 3160.00 3225.90 3400.00 47.780 240.047 31 77.49 3243.39 3500.00 47.780 240.047 3244.69 3310.59 3600.00 47.780 240.047 3311.88 3377.78 3700.00 47.780 240.047 3379.08 3'H'~..98 3800.00 47.780 240.O47 3446.28 3512.18 3900.00 47.780 240.O47 3513.48 3579.38 3924.59 47.780 240.047 3530.00 3595.90 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1.31 S 2.27 W 5980548.50 N 618927.71 E 5.23 S 9.06 W 5980544.47 N 618920.98 E 10.76 S 18.64 W 5980538.79 N 618911.50 E 11.76 S 20.36 W 5980537.76 N 618909.79 E 20.87 S 36.14 W 5980528.40 N 616894.15 E 32.54 S 56.36 W 5980516.41 N 61 6874.13 E 47.56 S 82.39 W 5980500.97 N 618848.33 E 56.55 S 97.97 W 5980491.74 N 618832.90 E 66.68 S 115.53 W 5980481.33 N 618815.50 E 80.11 S 138.81 W 5980467.54 N 618792.43 E 89.74 S 155.52 W 5980457.64 N 618775.88 E 97.23 S 1 68.51 W 5980449.95 N 618763.02 E 116.57 S 202.05 W 5980430.98 N 618729.78 E 146.96 S 254.78 W 5980398.86 N 618677.55 E 180.68 S 313.29 W 5980364.21 N 618619.57 E 200.78 S 348.17 W 5980343.56 N 618585.02 E 217.20 S 376.66 W 5980326.69 N 618556.80 E 244.55 S 424.13 W 5980298.59 N 618508.77 E 254.17 S 440.82 W 5980288.70 N 616493.23 E 291.15 S 504.99 W 5980250.71 N 616429.66 E 328.12 S 569.16 W 5980212.72 N 618366.08 E 365.10 S 633.32 W 5980174.73 N 618302.51 E 402.08 S 697.49 W 5980136.74 N 618238.94 E 439.95 S 761.65 W 5980098.75 N 618175.37 E 448.14 S 777.43 W 5980089.41 N 618159.74 E Dogleg Rate (onooft) 3.00 3.00 3.00 3.00 3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.08 0.00 0.00 0.00 0.08 0.00 Alaska Drilling & Wells PBU_WOA S Pad Vertical Section Comment 2.62 10.46 21.51 23.50 41.71 65.04 95.09 113.05 133.32 160.18 179.46 194.44 233.14 293.96 361.46 401.70 434.55 489.31 508.57 582.58 656.6O 730.62 8O4.63 878.65 896.85 SV4 Dir Rate Increase 5.00°/100ft : 2600.00flMD,2594.31ftTVD SV3 9 5/8" Casing SV2 End Dir, Start Sail @ 47.780° · 3255.61flMD,3146.36ftTVD SV1 UG4 Con#hued... 30 November, 2000 - 17:41 - 2 - DrillQuest 2.00. 05 North Slope Alaska Measured Depth (ft) Incl. 3991.55 47.780 240.047 4000.00 47.780 240.047 4100.00 47.780 240.047 42(X).00 47.780 240.047 4300.00 47.780 240.047 4400.00 47.780 240.047 447520 47.780 240.047 4500.00 47.780 240.047 4600.00 47.780 240.047 4700.00 47.780 240.047 Sub-Sea Depth (ft) 3575.00 3647.87 3715.07 3782.27 3849.47 3916.67 4051.06 Vertioal Depth 3640.90 3646.58 3713.77 3780.97 3848.17 3915.37 3965.90 3982.57 4O49.76 4116.96 4800.00 47.780 240,047 411826 4184.16 4g00.00 47.780 240.047 4185.46 4251.36 4996.05 47.780 240,047 4250.00 4315.90 5000.00 47.780 240.047 4252.66 4318.58 5100.00 47.780 240.047 4319.85 4385.75 Sperry-Sun Drilling Services Proposal Report for S-213 Exp Slot 03 - S-213WP04 5200.00 47.780 240.047 4387.05 4452.95 5254,~3 47.780 240.047 4423.49 4489.39 5300.00 46.302 239~-~)4 4454.68 4520.58 5400.00 43.098 237207 4525.76 4591.66 5500.00 39.929 234.957 46(X).64 4666.54 5576.11 37.551 233.038 4660.00 4725.90 5600.00 36.811 232~392 4679.03 4744.93 5638.38 35.631 231.307 4710.00 4775.90 589920 33.781 229.455 4760.00 4825.90 5700.00 33.757 229.429 4760.66 4826.58 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (fi) (ft) 472.90 S 820.40 W 5980063.97 N 618117.17 E 476.03 S 825.82 W 5980060.76 N 618111.80 E 513.00 S 889.98 W 5980022.77 N 618046.23 E 549.98 S 954.15 W 5979984.78 N 617984.66 E 586.96 S 1018.31 W 5979946.79 N 617921.09 E 623.93 S 1082.48 W 5979908.80 N 617857.52 E 651,74 S 1130.73 W 5979880.24 N 617809.72 E 660.91 S 1146.65 W 5979870.81 N 61 7793.95 E 697.88 S 1210.81 W 5979832.82 N 617730.38 E 734.86 S 1274.98 W 5979794.83 N 617666.81 E 771.83 S 1339.14 W 5979756.84 N 61760324 E 808.81 S 1403.31 W 5979718.85 N 617539.67 E 844.32 S 1464.94 W 5979682.37 N 617478.61 E 845.79 S 1467.47 W 5979680.86 N 617476.10 E 882.76 $ 1531.64 W 5979642.87 N 617412.53 E 919.74 S 1595.81 W 5979604.88 N 617346.96 E 939.79 S 1630.60 W 5979584.28 N 617314.48 E 956.72 S 1659.50 W 5979566.89 N 617285.86 E 993.75 S 1719.29 W 5979528.92 N 617226.66 E 1030.69 S 1774.30 W 5979491.12 N 617172.25 E 1058.66 S 1812.83 W 5979462.53 N 617134.16 E 1067.41 S 1824.32 W 5979453.61 N 617122.82 E 1081.41 S 1842.16 W 5979439.32 N 61710520 E 1103.48 S 1868.84 W 5979416.83 N 617078.88 E 1103.77 S 1869.17 W 5979416.53 N 617078.55 E Dogleg Ra~e (onooft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 Alaska Drilling & Wells PBU_WOA S Pad Vertical Section Comment 946.41 952.66 1026.68 1100.69 1174.71 1248.72 1304.38 1322.74 1396.75 1470.77 1544.78 1618.80 1689.89 1692.82 1766.83 1840.85 1880.98 1914.47 1984.79 2051.01 2098.51 2112.88 2135.42 2169.73 2170.17 UG4A UG3 UG1 Begin Dir @ 3.50°/100ft · 5254.23ft MD, 4489.39ff TVD Top Ugnu Ma sand Mb1 Mb2 Continued... 30 November, 2000- 17:41 - 3- DrillQuest 2.00.05 North Slope Alaska Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 5735.07 32.705 228.276 4790.00 4855.90 5758.77 32.000 227.460 4810.01 4875.91 5800.00 30.557 227.460 4845.25 4911.1 5 5828.59 29.556 227.460 4870.00 4935.90 5851.50 28.755 227.460 4890.00 4955.90 5874.22 27.959 227.460 4910.00 4975.90 5900.00 27.057 227.460 4932.86 4998.76 5963.55 24.8,33 227.460 4990.00 5055.90 6(X)0.00 23.557 227.460 5023.25 5089.15 6018.23 22.919 227.460 5040.00 5105.90 6061.42 21.407 227.460 5080.00 5145.90 6100.00 20.057 227.460 5116.08 5181.98 6104.17 19.911 227.460 5120.00 5185.90 6167.55 17.693 227.460 5180.00 5245.90 6200.00 16.557 227.460 5211.01 5276.91 6219.78 15.865 227.460 5230.00 5295.90 6261.22 14.414 227.460 5270.00 5335.90 6300.00 13.057 227.460 5307.67 5373.57 6302.40 12.973 227.460 5310.01 5375.91 6400.00 9.557 227.460 5405.71 5471.61 Sperry-Sun Drilling Services Proposal Report for S-213 Exp Slot 03 - S-213WP04 6500.00 6.057 227.460 5504.77 5570.67 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (fi) (ft) (ft) (ft) 1116.42 S 1883.65 W 5979403.66 N 617064.27 E 1124.92 S 1893.05 W 5979395.01 N 617055.01 E 1139.39 S 1908.82 W 5979380.29 N 617039.47 E 1149.08 $ 1919.38 W 5979370.44 N 617029.07 E 1156.62 S 1927.60 W 5979362.76 N 617020.97 E 1163.92 $ 1935.55 W 5979355.34 N 617013.13 E 1171.97 S 1944.32 W 5979347.15 N 617004.49 E 1190.76 S 1964.80 W 5979328.04 N 616984.31 E 1200.86 S 1975.81 W 5979317.76 N 616973.46 E 1205.73 S 1981.11 W 5979312.82 N 616968.24 E 1216.74 S 1993.12 W 5979301.61 N 616958.41 E 1225.98 $ 2003.18 W 5979292.22 N 616946.50 E 1226.94 S 2004.23 W 5979291.24 N 616945.46 E 1240.75 $ 2019.28 W 5979277.19 N 616930.63 E 1247.21 $ 2026.32 W 5979270.62 N 616923.70 E 1250.94 S 2030.39 W 5979266.82 N 616919.69 E 1258.26 S 2038.36 W 5979259.38 N 616911.83 E 1264.49 S 2045.15 W 5979253.05 N 616905.15 E 1264.85 S 2045.54 W 5979252.67 N 616904.75 E 1277.74 $ 2059.59 W 5979239.56 N 616890.91 E 1286.92 S 2069.60 W 5979230.22 N 616881.05 E Dogleg Rate (°/lOOft) Alaska Drilling & Wells PBU_WOA S Pad Vertical Section Comment 3.50 2189.14 Mc/WS2/Top Schrader Bluff 3.50 2201.62 S-213 Target 3.50 2222.65 3.50 2236.73 Na 3.50 2247.69 Nb 3.50 2258.30 Nc 3.50 2270.00 3.50 2297.32 Top OA sand / WS1 3.50 2312.00 3.50 2319.07 OBa 3.50 2335.08 OBb 3.50 2348.50 3.50 2349.90 OBc 3.50 2369.98 OBd 3.50 2379.37 3.50 2384.79 OBe 3.50 2395.43 OBf 3.50 2404.48 3.50 2405.01 OBf_Base 3.50 2423.74 2437.09 Total Depth' 6500.00ftM D,5570.67ffTVD 7" Casing Continued... 30 November, 2000 - 17:41 - 4 - DrillQuest 2.00.05 Sperry-Sun Drilling Services Propo~l Report for S-213 Exp Slot 03 - S-213WP04 North Sk~e Alaska Alaska Drillln~l & WMIs PBU_WOA S Pad All data is in feet unless olherwise stated. Directions and coordinates are relative to True Norlh. Verlical depths am relative to Exp Slot 02. Nmlhings and Eastings are relalive to Exp Slot 02. Magnelic Declination at Surface is 26.763° (30-Nov-00) ~- The Dogleg Severity is in Degrees per 100 feet. Verlical Section is from F_.xp Slot 02 and calculated along an Azimulh of 238.126° (True). Based UlXm Minimum Curvature type calculations, at a Measured Depth of 6500.00ft., The ~ Hole Displacement is 2437.09fL, in the Direction of 238.126° (True). 30 November, 2000-17:41 - 5 - DrflJOuest 2.00.05 WI~.L DETAILS Name +N/-S +E/-W NmOing Fasting LatitudeLongitude Slot S-213 Exp-~t{R:5~ 1005 ~.20 18'..2871.59 188649,85 70=21' 19.849N 149: OZO2.959W ANTI-COLLISION SETI~NGS Interpolation Method'MD Interval: 100.00 Depth Range From~ 65,70 To: 6565.75 Maximum Range: 843.42 Reference: Pla~ S-213 Wp4 BP Amoco Depth Fm Depth To Survey/Plan Tool Calculation Method: !gr~mimum C~a~'at~z 1~O.0~ Plmmd: S-213 Wp4 VI CB-GYRO-SS Enor System: IgCWSA 6565,75 Phan~l: S-213 Wp4 VI MWI) Scaa Metl~: H~h Skle + Azimuth Enor Surface: l~tpacal + Casing Wan~g Method: Rules Based --64 -6O --5O -4O -3O -2O --10 --0 --10 --2O --30 24~ --4O --~=:~ From Colour To MD ..... - ......- .... . .~ 500 1000 L:-:- :-:-::-::-:-?' '-~~>- -~=3_~0 1000 1500 - - :----_-: :-:-:--i: : :-'i ~~ 1500 2000 3oo0 4ooo -:---:-_- ---:: ':-_ .... -..:.-.:- ...' . ~ 4000 .: >.... -' . % N6ooo 7000 1 lOOO 12000 . - '"" .-- -- oo C> I-T'I LI~END S-OIA(S-OIA), MajorRi~k S-OIB (S-fflB). Maj~ Risk S-I0.1 (S-103), M~))r gist S-1~4 (Slo¢22) (.g- 105), Major Risk -- S-106ExpSlot21 (S. 106), Major Risk S-17ALI (S-17ALI), Major Risk S-17APBI (S-17APBI), Major Risk -- S-17A (S-17A), Major Risk -- S-17 (S-17), Major Risk -- S-200PBI (S-2{llPBI), MajorRiak ~--- s.2ffi (g-200), Major Risk -- S-201 (H.AN S-2OI), Major Risk ~ S-214 F. ap Slot 2 ($.214), Major Ri~k S-216 Ego Skn I (Phn S-~16), Majo~ Risk -- S.22A (S-22A), ..)~a~r -- S-22B (S-22B), Major Ri~k = :S-22 (S-22). Mawr Risk S-7.3A (S-23^). Major Ri~k ~ S-23(S-23). Major Risk ..... g-2.tA (S-24A). Major Ri~k S-~IA (S-31A), Major Risk ~ S-31 (S.3 I), Major Risk m S-4 ILl (S-41LI), Major Risk ~ S-41PBI ¢S-41FBI),Ma,~rRisk ~ S-41 (S-41), MajorRisk ~ S~2PBI (S-42PBI), Major Risk -- S-42(S-42), MajorRisk -- g-4n.I (S-43LI), S-441.]PBI ($~]PBI). M~jor Risk -- S-4-Q.] (S-44L]).MajorRisk ~ S-44(S-44), MajofRisk ~ S-213 ~ S-213 Wp4 Plan: S-213 Wp4 (S-213 F. ko Sbt 3/S-213) Cmaled By: Duane Vaagm Dale: Cl~:ked: Dale: SECTION DETAR3 Sec MD Inc Azi TVD N/S Eah'DL~glTace VSec Targ~ 1 65.75O.000.00 65.75 0.00 0.000.000.00 0.00 ~ 131.45 O.000.00 131.45 O.0~ 0.000.000.00 0.00 i 665.75 0.EO0.00665.75 0.ilo RO0 0.000.00 0.00 2165.7:5 0.000.002165.75 0.00 0.000.000.00 0.00  2r~.75 15.~0 240.~0 2~0.~6-32.54-56.~ 3.00 240.00 332-1.35 47.78 240.05 32=12.10 -.'200.7'7 -348.18 5.C0 0.07 401.(0  5319.95 47.78 240.05 45;55.12 -939.70 -1630.63 0.CO 0.1101880.96 5824.55 P__O0 *__..'0.46 4941.69 -1124.85 -1893.12 3.50 202382201.64 0 6368.15 12.97 227.46 5441.66 -126t. 76 -2045393.50 I1~.00 2-t~6.00 6565.75 6.06227.46 5636.42 -1286.83 -2069.64 3.50 180.00 2437.08 Sperry-Sun Anticollision Report Company: , BP Amoco Field: . Pruch2 Bay Reference Site: PB S'Pad ReferenceWelh S-213 ExpSIot Reference Wellpath: S-213 Date: 11/30f2000 .Time: 14:04:07 Page: 1 · Co,o~)Reference: Well: S-213 Exp Slot 3, True North Yertled (TVI)) R~zence: 46: 25 &/2/1990 00:00 65.7 · Db: Oracle GLOBAL SCAN APPLIED: All weilpaths within 200'+ 100/1000 of reference - There are Ta~m~ in this fl/M~: S-213 Wp4 & NOT PLANNED PROWl Interpolation Method: MD Interval: 100.0 ft Error Model: ISCWSA Ellipse 1 Depth Range: 65.7 to 6565.7 ft Scan Method: High Side + Azimuth Maximum Radius: 843.4 ft Error Surface: Ellipse + Casing Casing Points 6064.0 5153.3 7.000 8.500 Case2 Plan= S-213 Wp4 Date Composed: 11/30/2000 Version: 1 Principal: Yes Tied-to: From Well Ref. Point Summary < ..... ." .... ,-~.~.~:e. Offset wellpath .,~'.~,..~-,:,~.,.,~> .... i'.. ". '~. i''~ Reference ..'."offset' ~ Ct~,ctr".No,Go.' AlloWable l ........... Si~e.' '..: ..:.:. : : :'.'....:. i.."Well. .'...]":' :.',...':.:": :..'.., ,.i:"' Well~ '.:~':.. ' ',".'....'...':. ': .'.,' ] .':] ".. :.?ID:" ': .'. ': ':MD.: i' ..Distanee,."~ea". '.' .Deviation.. 'Warning' .'." .'"', '.: .i....: :/. "": "/, ,..':'. "': '..':'.",.','.:,.'.:../.:] .. .... i '.:':'. :'i.":. '] ':, "." ::.'.:.:.,'ff. :' ii], "'/. ft:"i ..:.', .ft': :" 'i' .. '. ]ft .' :"i ..":.:ff. ':' ':" . "." '..: .:'.:. ' PBS Pad S-01A S-01A V1 4644.8 4700.0 460.1 191.8 367.3 Pass: Major Risk PBS Pad S-01B S-01B V1 4644.8 4700.0 460.1 191.8 367.3 Pass: Major Risk PBS Pad S-01 S-01 V1 4362.8 4400.0 456.7 144.9 366.8 Pass: Major Risk PBS Pad S-03 S-03 V1 3370.3 3500.0 179.1 62.6 124.0 Pass: Major Risk PBS Pad S-100 S-100 V9 401.1 400.0 93.0 7.5 85.5 Pass: Major Risk PBS Pad S-101 S-101 V2 700.6 700.0 60.2 13.7 46.6 Pass: Major Risk PBS Pad S-101 S-101PB1 V9 700.6 700.0 60.2 13.8 46.4 Pass: Major Risk PBS Pad S-102 S-102 pbl V11 301.5 300.0 108.2 6.0 102.2 Pass: Major Risk PBS Pad S-102 S-102 V2 301.5 300.0 108.2 5.8 102.4 Pass: Major Risk PBS Pad S-103 S-103 V1 Plan: S-103 W 999.7 1000.0 225.7 18.2 207.5 Pass: Major Risk PBS Pad S-105 (Slot22) S-105 V5 1100.5 1100.0 293.6 17.8 275.8 Pass: Major Risk PBS Pad S-106 Exp Slot 21 S-106 V1 Plan: Plan S- 500.0 500.0 271.6 9.2 262.4 Pass: Major Risk PBS Pad S-17AL1 S-17AL1 V1 Out of range PBS Pad S-17APB1 S-17APB1 V1 Out of range PBS Pad S-17A S-17A V1 Out of range PBS Pad S-17 S-17 V1 Out of range PBS Pad S-200PB1 S-200PB1 V4 1399.1 1400.0 32.7 21.0 11.8 Pass: Major Risk PBS Pad S-200 S-200 V2 Plan: Undefin 1399.1 1400.0 32.7 21.0 11.8 Pass: Major Risk PBS Pad S-201 PLAN S-201 V6 Plan: S- 799.8 800.0 241.0 16.5 224.5 Pass: Major Risk PBS Pad S-214 Exp Slot 2 S-214 V1 Plan: S-214 V 500.0 500.0 16.4 8.7 7.7 Pass: Major Risk PBS Pad S-216 Exp Slot I Plan S-216 V2 Plan: S- 500.0 500.0 31.3 8.7 22.6 Pass: Major Risk PBS Pad S-22A S-22A V1 3411.6 3400.0 602.6 67.2 536.2 Pass: Major Risk PBS Pad S-22B S-22B V2 3411.6 3400.0 602.6 67.3 536.1 Pass: Major Risk PBS Pad S-22 S-22 V1 3411.6 3400.0 602.3 67.2 535.8 Pass: Major Risk PBS Pad S-23A S-23A V3 Plan: Definit 3716.5 4100.0 816.4 1895.0 -895.5 FAIL: Major Risk PBS Pad S-23 S-23 V1 3309.6 3400.0 660.3 61.0 600.4 Pass: Major Risk PBS Pad S-24A S-24A V10 3166.5 3400.0 431.5 59.2 373.1 Pass: Major Risk PBS Pad S-31A S-31A V3 3230.9 3700.0 708.9 74.4 640.8 Pass: Major Risk PBS Pad S-31 S-31 V1 3230.9 3700.0 708.9 74.4 640.8 Pass: Major Risk PBS Pad S-41L1 S-41L1 V1 1480.1 1500.0 163.5 27.3 136.4 Pass: Major Risk PBS Pad S-41PB1 S-41PB1 V1 1480.1 1500.0 163.5 27.2 135.5 Pass: Major Risk PBS Pad S-41 S-41 V1 1480.1 1500.0 163.5 27.3 136.4 Pass: Major Risk PBS Pad S-42PB1 S-42PB1 V1 2804.3 2800.0 131.1 37.0 94.1 Pass: Major Risk PBS Pad S-42 S-42 V2 2804.3 2800.0 131.1 37.0 94.1 Pass: Major Risk PBS Pad S-43L1 S-43L1 V2 1097.5 1100.0 123.1 17.3 105.9 Pass: Major Risk PBS Pad S-43 S-43 V3 1097.5 1100.0 123.1 17.4 105.8 Pass: Major Risk PBS Pad S-44L1PB1 S-44L1PB1 V3 2702.8 2700.0 87.4 35.7 51.7 Pass: Major Risk PBS Pad S-44L1 S-44L1 V4 Plan: Undefi 2702.8 2700.0 87.4 36.0 51.5 Pass: Major Risk PBS Pad S-44 S-44 V10 2702.8 2700.0 87.4 35.8 51.6 Pass: Major Risk Site: PBS Pad Well: S-01A Rule Assigned: Major Risk Wellpath: S-01A V1 Inter-Site Error: 0.0 ft ::'." :...'.Refereiiee ::.:::' , :: .: :: :"' .i .':'" '.Offset ',.'. '..:.'... ' .:] '8e,.mLM:R~ AxiS:. '::..' . .!":: ',. :." '.. ". ' ' . '..... !, ..~ Clr~.Ctr::/'N°;G°":"'""All°Wable ' '/::':" : I ~: ..: ::..' .~.:. :;::".'.:'~o.:i: :...'. ~'~....:.:...i,~.i'.:..';.~e~. ~o*~.'~'~.'c,~ing.":'~':~" ..::'.': ..~.,~,~o.... w.,.~.g " .:" :' .' "" ' ::'.'. :':.':.". 1 :lAM S- 105 Kick Tolerance 12/2/2000 3:17 PM S-213 <= Data Input Phil Smith <:: Data Input Mud Weight (ppg) 10.50 For Well Plans: Mud Wt. = Zone of interest pore pressure Weak point - Measured depth (fl) Weak point - True vertical depth (ft) Weak point - Hole angle (deg) Weak point - Hole size (in) Weak point pressure - EMW (ppg) 2,860' 2,835' 28.0° 8.750" 12.50 Zone of interest - Measured depth (ft) Zone of interest - True vertical depth (ft) Zone of interest - Hole angle (deg) Zone of interest - Hole size (in) Zone of interest - Pore pressure EMW (ppg) 6,500' 5,570' 6.0" 8.750" 9.90 Gas gradient (psi/fl) 0.10 Bottom hole assembly OD (in) Bottom hole assembly length (ft) Drill pipe OD (in) 6.750" 200' 4.000'" BHA annular vol. @ zone of interest (bbl/ft) DP annular vol. @ zone of interest (bbl/ft) DP annular vol. @ weak point (bbl/ft) 0.0301 0.0588 0.0588 Additional safety margin (psi) <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input <== Data Input 0.00 <== Data Input Weak point pressure (psi): Plo 1,843 psi Weak point pressure - Safety margin: Pmax 1,843 psi Pmax EMW 12.50 ppg Max anticipated formation pressure (psi): Pf 2,867 psi Weak Pt to Zone of Interest distance (TVD ft): OH {TVD} 2,735' Weak Pt to Zone of Interest distance (MD ft): OH {MD} 3,640' Maximum influx height at the bit (TVD ft): H {1'VD} 1,051' Maximum influx height at the bit (MD ft): H {MD} 1,057' Calc. volume of {H} around BHA: Calc. volume of {H} around drill pipe: Vlbha 6.0 bbl Vldp 50.4 bbl talc. volume that H equals @ initial shut in: Vl 56.4 bbl vol. that H equals @ weak point (MD ft): Vwp 70.0 bbl Calc. volume of Vwp @ initial shut in: V2 45.0 bbl Kick Tolerance: V2 45.0 bbl Initial SICP which equals the Weak Point Pressure: by: G. S, Walz 11/22/94 NOTE: 295 psi S-213 Ri.qsite Summary of Drillin_cl Hazards POST THIS NOTICE IN THE DOGHOUSE '~"~~¢¢,~,~~¢¢¢ /._..2 Monitor closely for signs of gas in the surface hole and perform regular evacuation drills. No gas has been encountered so far in the Aurora / Polaris development and none is expected, however without the diverter on this well the consequence of encountering shallow makes reaction time more critical for personnel safety. High formation pressures are present sometimes above the reservoir zone. Expected formation pressure below the permafrost is 9.0 ppg EMW. Previous Aurora S-Pad surface holes were drilled with 9.6 - 9.7 pgg mud weight without problem. Hydrates have occasionally been encountered at S pad. No other shallow gas has been reported. S-100i and S-101 did not encounter any shallow gas problems. S-102 encountered hydrate shows at 2700' and 2850' TVDbkb, however there were no associated complications. Lost circulation while drilling has not been a problem so far in the Aurora development, despite several fault crossings. While this well is not planned to cross any faults, it does run parallel to a large fault from about 2100' MD to 5600' MD. It may be as close as 100-300' from the well plan. Pipe sticking tendency can be mitigated through short trips in the Ugnu / West Sak area and by carefully backreaming connections. Ream down with reduced pump rates. The Ugnu interval can be expected to contain hydrocarbons. S pad is not a designated H2S pad the two closest wells, S-44 and S-200 each registered 10 ppm at the last test in August, 2000. CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION Version 1.0 Polaris S-213 Hazards and Contingencies Page ! of 1 10/30/00 00177357 VENDOR ALASKASTAT 10 ' DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 102500 CK1025000 100. O0 100. O0 HANDL:',NO INST' S/H - TERRIE HUBI)LE X4&28 14E ATTACHED CHECK IS IN PAYMENT FOR ri'EMS DESC*i*ED ABOVE. ~[e]~r-~l~ ~ 1 OO. OO 1OO. OO ,.:,.,:BP EXPLORATION (ALASKA).~;i,,.!NG. !' .:: ~:.:':~.0:;ii3'0X":.19.66'12 :'?':,,":?:~,. }:?,. :., AN~RO'~AGE;:~iALXSK~; PAY ONE. .::. 300:1,;?.P ORCUp i fi~i!ii*!:::DR:I V~' .. · ... ANCHORAOE AK 9c~501 ~T o '/T.h e::, ORDER: .... ..,., According to the rules provided in our letter of 0~O',-) ~"~ , 2000 your request for an exception to the Diverter requirements at 20 AAC 25.035 (c) is granted. FIELD & POOL ~, _~/O/~ INIT CLASS ADMINISTRATION 1. 2. . 4. 5. 6. 7. 8. 9. 10. 11. ..~_._ DATE,- ~ 12. I?.- '5,i~ 13. WELL NAME~.~-Z-./~ PROGRAM: exp dev ~ redrll serv wellbore seg ann. disposal para req ENGINEERING Permit fee attached. Lease number approl~ri;at~.~, i ~..i~'~::~i"~.itifi~.."'~/~[ Unique well name and number .................. Well located in a defined pool.~. ~ ............. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells. ,~. ....... Sufficient acreage available .in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected party. -~". ................ Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can.be issued without administrative approval ...... Can permit be approved before 15-day wait ........... GEOL AREA ,~4:~t~ UNIT# ~)//~ ~-~'_~ ON/OFF SHORE Y N ~ , ~ 14. Conductor string provided ................... ~ N 15. Surface casing protects all known USDWs ........... ~ N 16. CMT vol adequate to circulate on conductor & surf csg ..... N 17. CMT vol adequate to tie-in long string to surf csg ........ Y~..(~ 18. CaT will cover all known productive horizons .......... ~ N 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Ad.e. quate wellb, ore separation proposed ............. 23. If d,verter required, does it meet regulations ...... . . . . Y.~ N ~)'~,~.~--~.t-- ,.,.~\~.~- 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ ._~~ DATE 26. BOPE press rating appropriate; test to "z.~{~) psig. (-~(r,~ 27. Choke manifold complieSw/API RP-53 (May84) ........ (..~ N _~',. , ~.. ' .. 28. Work will occur without operat,on' shutdown ....... .... ~)~N,. 29. Is presence of H2S gas probable ................. Y (-~ -- ~c.~,,~.~- '~Jq. \ \ , _ GEOL. O.GY 30. Perm,t can be ,ssued w/o hydrogen sulfide measur, e~s,_;~5... · .. II 31. Data presented on potential overpressure zones ~..... ("~~'~:',~~ ~~~ ~-~.~ .4~-~-..~v d~ .~~ II 32. se sm,c anal.y..s.,s of sha,o~ gas zones...: ..... .... ,,~ ( ~_ ,,.,~ ~.. ~ ~,~,~,,t ~ ?~, ~.~//~: ~ ~ C~ '('_<_'~ ~- II {PPR DATE 33. S~ea.bed. condit!o.n su~.ey (,f o,ff,-shore) ..... .':' '.' ?. ,~;~..- ('?_..,~",Cx:'~ 34. uontactname/pnonerorweeKiyprogressrepor[sJexp~pwamryon~y.I A'~NULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and~ _ _ (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N O Z O GEOLOGY: ENGINEERING: UIC/A~ular c:\msoffice\wordian\diana\checklist (rev.' 11/01fl00) COMMISSION: d Comments/Instructions: ,, . , I..r~,:Cc.(~ : II Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to. the Well Permitting Process but is part of the history' file. To improve the readability of the Well History file and to Simplify finding information, informati;3n of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. S-213.txt Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Wed Sep 05 12:39:43 2001 Reel Header Service name ............. LISTPE Date ..................... 01/09/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Tape Header Service name ............. LISTPE Date ..................... 01/09/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD S-213 500292299300 B.P. ALASKA INC. Sperry Sun 04-SEP-01 MWD RUN 1 MWD RUN 2 MAD RUN 2 AK-MM-00334 AK-MM-00334 AK-MM-00334 R. MCNEILL J. SACK J. SACK D. FERGUSON D. FERGUSON D. FERGUSON 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. 35 12N 12E 4347 4501 .00 65.90 36.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 12.250 9.625 2857.0 8.750 ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING Page 1 S-213.txt GEIGER-MUELLER TUBE DETECTORS. MWD RUN 2 IS DIRECTIONAL WITH DGR, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO-DENSITY (SLD). 4. A MEASUREMENT AFTER DRILLING (MAD) PASS WAS PERFORMED WHILE RUNNING IN THE HOLE AFTER MWD RUN 2 TO OBTAIN REPEAT DATA OVER THE INTERVAL 5261'MD 4512'TVD TO 6400'MD, 5493'TVD. MAD PASS DATA IS PRESENTED AS A TAIL TO THE LOGS. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED PER THE EMAIL FROM G. BERNASKI OF BP EXPLORATION (ALASKA), INC. ON 08/21/01. MWD DATA IS CONSIDERED PDC. 6. THIS WELL REACHED A TOTAL DEPTH OF 6520'MD, 5608'TVD. SROP = .SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY). SPSF = SMOOTHED COMPENSATRED NEUTRON POROSITY (SS MATRIX, FIXED HOLE SIZE). SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR PHOTOELECTRIC ABSORPTION FACTOR. (LOW-COUNT BIN). SMOOTHED RATE OF PENETRATION WHILE DRILLING. EXTRA MEDIUM DEEP THE FOLLOWING PARAMETERS WERE USED TO PROCESS POROSITY LOG DATA: HOLE SIZE: 8.75" MUD WEIGHT: 10.5 PPG MUD SALINITY: 900 PPM CHLORIDES FORMATION WATER SALINITY: 50000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 Page 2 FILE SUMMARY PBU TOOL CODE GR ROP PEF RPX RPS RPM RPD RHOB NPHI FCNT NCNT FET DRHO $ # BASELINE CURVE FOR SHIFTS: START DEPTH 177.0 231.5 2847.0 2847.0 2847.0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 CURVE SHIFT DATA (MEASURED DEPTH) STOP DEPTH 6492.5 6520.5 6442 5 6484 5 6484 5 6484 5 6484 5 6442 5 6432 0 6432 0 6432 0 6484 5 6442 5 S-213.txt EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 1 177.0 MWD 2 2870.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 ROP MWD FT/H 4 1 68 GR MWD API 4 t 68 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 NPHI MWD PU-S 4 1 68 FCNT MWD CP30 4 1 68 NCNT MWD CP30 4 1 68 RHOB MWD G/CM 4 1 68 DRHO MWD G/CM 4 1 68 PEF MWD B/E 4 1 68 MERGE BASE 2870.0 6520.5 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Service Unit Min Max DEPT FT 177 6520.5 ROP MWD FT/H 0 1522.13 GR MWD API 10.07 132.12 RPX MWD OHMM 0.76 213.56 RPS MWD OHMM 0.87 347.94 RPM MWD OHMM 0.28 2000 RPD MWD OHMM 0.9 2000 FET MWD HOUR 0.17 53.17 NPHI MWD PU-S 19.62 77.32 First Mean Nsam Reading 3348.75 12688 177 114.131 12579 231.5 64.8412 12632 177 11.0687 7276 2847 12.331 7276 2847 15.8964 7276 2847 17.6834 7276 2847 0.855922 7276 2847 40.5339 7171 2847 Page 3 Last Reading 6520 5 6520 5 6492 5 6484 5 6484 5 6484 5 6484 5 6484 5 6432 FCNT MWD CP30 402 943 NCNT MWD CP30 2008 3412 RHOB MWD G/CM 1.254 3.153 DRHO MWD G/CM -0.493 0.567 PEF MWD B/E 0.24 14.72 S-213.txt 566.652 7171 2725.77 7171 2.20399 7192 0.0488391 7192 3.445 7192 First Reading For Entire File .......... 177 Last Reading For Entire File ........... 6520.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 2847 2847 2847 2847 2847 6432 6432 6442.5 6442.5 6442.5 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE NCNT FCNT NPHI PEF DRHO RHOB RPS FET RPM RPX RPD GR RAT $ MERGED DATA SOURCE PBU TOOL CODE MWD $ START DEPTH 5261.5 5261.5 5261.5 5272.0 5272.0 5272.0 5314.0 5314.0 5314.0 5314.0 5314.0 5322.0 5350.0 STOP DEPTH 6311.5 6311 5 6311 5 6321 0 6321 0 6321 0 6364 5 6364 5 6364 5 6364 5 6364 5 6372 0 6400 0 MAD RUN NO. MAD PASS NO. 2 1 REMARKS: MERGED MAD PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 MERGE TOP MERGE BASE 5261.0 6400.0 Page 4 S-213 .txt Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep DEPT FT 4 1 68 RAT MAD FT/H 4 1 68 GR MAD API 4 1 68 RPX MAD OHMM 4 1 68 RPS MAD OHMM 4 1 68 RPM MAD OHMM 4 1 68 RPD MAD OHMM 4 1 68 FET MAD HOUR 4 1 68 NPHI MAD PU-S 4 1 68 FCNT MAD CP30 4 1 68 NCNT MAD CP30 4 1 68 RHOB MAD G/CM 4 1 68 DRHO MAD G/CM 4 1 68 PEF MAD B/E 4 1 68 Code Offset Channel 0 1 4 2 8 3 12 4 16 5 20 6 24 7 28 8 32 9 36 10 40 11 44 12 48 13 52 14 Name Service Unit DEPT FT RAT MAD FT/H GR MAD API RPX MAD OHMM RPS MAD OHMM RPM MAD OHMM RPD MAD OHMM FET MAD HOUR NPHI MAD PU-S FCNT MAD CP30 NCNT MAD CP30 RHOB MAD G/CM DRHO MAD G/CM PEF MAD B/E Min 5261.5 0 24 92 0 69 0 61 0 63 1 14 14 33 23 31 65 2536 2.034 -0.039 1.04 Max 6400 4121.9 137.58 42.77 49.11 52.94 56.16 25.37 49.7 795 3312 2.78 0.432 5.91 First Reading For Entire File .......... 5261.5 Last Reading For Entire File ........... 6400 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Mean 5830.75 339.921 68.1735 6.66274 6.70867 6.94141 7.31048 20.0659 35.8324 600.505 2833.09 2.28189 0.0584956 2.57825 Nsam 2278 2101 2101 2074 2074 2074 2074 2074 2043 2038 2038 2034 2034 2034 First Reading 5261.5 5350 5322 5314 5314 5314 5314 5314 5261.5 5261.5 5261.5 5272 5272 5272 Last Reading 6400 6400 6372 6364 5 6364 5 6364 5 6364 5 6364 5 6311 5 6311 5 6311 5 6321 6321 6321 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY Page 5 VENDOR TOOL CODE START DEPTH SGRC 177.0 SROP 231.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 S-213.txt STOP DEPTH 2815.0 2870.0 01-JAN-01 Insite 5.46 Memory 2870.0 .0 24.5 TOOL NUMBER PB01782CG8 12.250 Spud Mud 9.00 320.0 9.1 3OO 14.4 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 .0 72.9 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 177 2870 1523.5 5387 Page 6 First Reading 177 Last Reading 2870 ROP MWD010 FT/H 0.61 218.9 GR MWD010 API 18.17 121.39 First Reading For Entire File .......... 177 Last Reading For Entire File ........... 2870 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 S-213.txt 72.4507 5278 59.8836 5277 231.5 177 2870 2815 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 .5000 DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE GR RHOB DRHO NCNT FCNT NPHI FET RPD RPM RPS RPX PEF ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH 2815.5 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2847 0 2870 5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 6492.5 6442.5 6442.5 6432.0 6432.0 6432.0 6484.5 6484.5 6484.5 6484.5 6484.5 6442.5 6520.5 05-JAN-01 Insite 65.44 Memory 6520.0 16.6 49.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01787HRG6 EWR4 ELECTROMAG. RESIS. 4 PB01787HRG6 CNP COMPENSATED NEUTRON PB01787HRG6 Page 7 SLD $ STABILIZED LITHO DEN BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): S-213.txt PB01787HRG6 8.750 2857.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.50 MUD VISCOSITY (S): 52.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 900 FLUID LOSS (C3): 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.300 MUD AT MAX CIRCULATING TERMPERATURE: .779 MUD FILTRATE AT MT: 2.000 MUD CAKE AT MT: 3.000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 NPHI MWD020 PU-S 4 1 68 32 9 FCNT MWD020 CP30 4 1 68 36 10 NCNT MWD020 CP30 4 1 68 40 11 RHOB MWD020 G/CM 4 1 68 44 12 DRHO MWD020 G/CM 4 1 68 48 13 PEF MWD020 B/E 4 1 68 52 14 62.0 108.0 57.0 70.0 First Name Service Unit Min Max Mean Nsam Reading DEPT FT 2815.5 6520.5 4668 7411 2815.5 ROP MWD020 FT/H 0 1522.13 144.262 7301 2870.5 GR MWD020 API 10.07 132.12 68.3982 7355 2815.5 RPX MWD020 OHMM 0.76 213.56 11.0687 7276 2847 RPS MWD020 OHMM 0.87 347.94 12.331 7276 2847 RPM MWD020 OHMM 0.28 2000 15.8964 7276 2847 RPD MWD020 OHMM 0.9 2000 17.6834 7276 2847 FET MWD020 HOUR 0.17 53.17 0.855922 7276 2847 NPHI MWD020 PU-S 19.62 77.32 40.5339 7171 2847 FCNT MWD020 CP30 402 943 566.652 7171 2847 NCNT MWD020 CP30 2008 3412 2725.77 7171 2847 Page 8 Last Reading 6520 5 6520 5 6492 5 6484 5 6484 5 6484 5 6484 5 6484 5 6432 6432 6432 RHOB MWD020 G/CM 1.254 3.153 DRHO MWD020 G/CM -0.493 0.567 PEF MWD020 B/E 0.24 14.72 S-213.txt 2.20399 7192 0.0488391 7192 3.445 7192 First Reading For Entire File .......... 2815.5 Last Reading For Entire File ........... 6520.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 2847 2847 2847 6442.5 6442.5 6442.5 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 2 1 MAD RUN NUMBER: MAD PASS NUMBER: FILE SUMMARY VENDOR TOOL CODE NPHI NCNT FCNT PEF RHOB DRHO RPX RPS RPM RPD FET GR RAT $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH 5261 5 5261 5 5261 5 5272 0 5272 0 5272 0 5314 0 5314 0 5314 0 5314 0 5314 0 5322.0 5350.0 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY STOP DEPTH 6311.5 6311.5 6311.5 6321.0 6321.0 6321.0 6364.5 6364.5 6364.5 6364.5 6364.5 6372.0 6400.0 05-JAN-01 Insite 65.44 Memory 6520.0 16.6 49.2 TOOL NUMBER PB01787HRG6 Page 9 EWR4 CNP SLD $ ELECTROMAG. RESIS. 4 COMPENSATED NEUTRON STABILIZED LITHO DEN BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PM: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 S-213.txt PB01787HRG6 PB01787HRG6 PB01787HRG6 8.750 LSND 10.50 52.0 8.8 900 4.0 1.300 62.0 .779 108.0 2.000 57.0 3.000 70.0 Name Service Order Units Size Nsam Rep Code Offset DEFT FT 4 1 68 0 RAT MAD021 FT/H 4 1 68 4 GR MAD021 API 4 1 68 8 RPX MAD021 OHMM 4 1 68 12 RPS MAD021 OHMM 4 1 68 16 RPM MAD021 OHMM 4 1 68 20 RPD MAD021 OHMM 4 1 68 24 FET MAD021 HOUR 4 1 68 28 NPHI MAD021 PU-S 4 1 68 32 FCNT MAD021 CF30 4 1 68 36 NCNT MAD021 CF30 4 1 68 40 RHOB MAD021 G/CM 4 1 68 44 DRHO MAD021 G/CM 4 1 68 48 PEF MAD021 B/E 4 1 68 52 Channel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 .Name Service Unit Min Max DEPT FT 5261.5 6400 RAT MAD021 FT/H 0 4121.9 GR MAD021 API 24.92 137.58 RPX MAD021 OHMM 0.69 42.77 RPS MAD021 OHMM 0.61 49.11 RPM MAD021 OHMM 0.63 52.94 RPD MAD021 OHMM 1.14 56.16 FET MAD021 HOUR 14.33 25.37 NPHI MAD021 PU-S 23.31 49.7 First Mean Nsam Reading 5830.75 2278 5261.5 339.921 2101 5350 68.1735 2101 5322 6.66274 2074 5314 6.70867 2074 5314 6.94141 2074 5314 7.31048 2074 5314 20.0659 2074 5314 35.8324 2043 5261.5 Page 10 Last Reading 6400 6400 6372 6364.5 6364.5 6364.5 6364.5 6364.5 6311.5 FCNT MAD021 CP30 465 795 NCNT MAD021 CP30 2536 3312 RHOB MAD021 G/CM 2.034 2.78 DRHO MAD021 G/CM -0.039 0.432 PEF MAD021 B/E 1.04 5.91 S-213.txt 600.505 2038 2833.09 2038 2.28189 2034 0.0584956 2034 2.57825 2034 First Reading For Entire File .......... 5261.5 Last Reading For Entire File ........... 6400 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/09/05 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 5261.5 6311.5 5261.5 6311.5 5272 6321 5272 6321 5272 6321 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 01/09/05 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 01/09/05 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File Page 11