Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutCO 145 BConservation Order Cover Page
XHVZE
This page is required for administrative purposes in managing the scanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
)_. ~_~..~ Conservation Order Category Identifier
Organizing
RESCAN
[] Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED (Scannable with large
plotter/scanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other
BY: ~MARIA
Scanning Preparation
TOTAL PAGES
Production Scanning
.I
Stage I PAGE COUNT FROM SCANNED DOCUMENT:
PAGE COUNT MATCHES NUMBER IN SCANNING PREP,~RATION: .,,~ YES NO
BY:
Stage 2
IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: __ YES ~ NO
BY: ~ MARIA DATE: ~;:~~ /S/ ~
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
General Notes or Comments about this Document:
5/21/03 ConservOrdCvrPg.wpd
• ~
Index Conservation Order 145B
Prudhoe Bay Field
1) October 18, 1977 Atlantic Richfield Company ltr re: Reservoir Surveillance
Program
2) November 3, 1977 Notice of Public Hearing, Affidavit of Publication
3) November 21, 1977 Atlantic Richfield Company withdraw of request
Conservation Order 145B
~3
AtlanticRichfieldCompany
North Ame. rican Producing Division
North Ala~'~ 3istrict
Post Office-~ox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
Harold C. Heinze
Engineering Manager
November 21, 1977
Mr. Hoyle Hamilton
State of Alaska
Division of Oil and Gas
3001 Porcupine
Anchorage, AK 99502
Dear Hoyle'
Atlantic Richfield Company hereby requests that the Public
Hearing on Conservation Order No. 145B (change to Rule 6(f) -
Pressure Surveys) currently scheduled for November 29 be
deferred for an indefinite period. We apologize for any
inconvenience to the Committee as a result of this proposed
cancellation and will be back in touch on this subject in
the future, as appropriate.
Very truly yours,
/
H~o[d C, He~ze
HCH/vaf
CC:
Mr. George Nelson
BP Alaska Inc.
311 "C" Street
P. O. Box 4-1379
Anchorage, AK 99504
C.
_
4
,'5 r,,,,,-.
~.,
] ,.--- r- ,--~
---- .
i
'1
R[CEiVED
Division
~2
;VERTISING
ORDER
IN,O!CE MUST BE tlXl TRIPLiCATF, SHOWING ADVEi-tTISii~ 5
ORDF,R NO., CF,RTiFIED AFFIDAVIT OF PUBLICATION (PART
2 OF THIS FORM) WiTH ATTACHF,D COPY GF ADVERTISE-
MENT MUST BE SUBMITTED WITH INVOICE.
VENDOR NO.
2. 'PU~L]SHE~
DEPT. NO. A.D. NO.
DATE OF A.D.
,Ancbz~r~i~e F. ei!y News
Division of Oil and ~%s
3001 Porct~.~ine Drive
Aachor~?e, f-EEa~ka 99501
11/3,/77
DATES ADVERTISEMENT REQU RED:
THE MATERIAL BETWEEN THE DOUBLE LINES MUST BE PRINTED IN
ITS ENTIRETY ON THE DATES SHOWN.
B! LL!NG ADDRESS:
AFFIDAVIT-OF-PUBLICATION
UNITED STATES OF AMERICA
STATE OF A1 ~ ~ka t ss
Third
DIVISION.
BEFORE ME, THE UNDERSIGNED,A NOTARY PUBLIC THIS DAY
PERSONALLY APPEARED Mary l,. Russe']] WHO,
BEING FIRST DULY SWORN, ACCORDING TO LAW, SAYS THAT
HE/SHE IS THE Lc§al Clerk OF
PUBLISHED AT Ancho'ra~e
Third Alaska
AND STATE OF AND THAT THE
ADVERTISEMENT, OF WHICH THE ANNEXED IS A TRUE COPY,
WAS PUBLISHED IN SAID PUBLICATION ON THE ~c] DAY OF
Nove_m.~er 19Z:L, AND THEREAFTER FOR
CONSECUTIVE DAYS, THE LAST PUBLICATION APPEARING ON
THE _~rfl DAY OF Nnvemh~.r 19 27AND THAT THE
RATE CHARGED THEREON IS NOT IN EXCESS OF THE RATE
CHARGED PRIVATE INDIV_IDUALS.
SUBSCRI~AND SWORN TO ~EFOR~ ME
THIS 7th DAY OF Nnv~.mt~e~19~7__.
·/' ?- - _~ .
THE ANCHORAGE DAILY NEWS
IN SAID DIVISION
NOTARY PUBLIC FOR STATE OFAlaska
MY COMMISSION EXPIRES December '14-~ lq77 ....
REMINDER-
ATTACH INVOICES AND PROOF OF PUBLICATION.
Notice of Public Hearing
State of Alaska
DePartment of
Natural Resources
Division of Oil and
Gas Conservation
Alaska Oil and
Gas Conservation Committee
Conservati.on Order No. 145B
Re: The re~uest of the Atlantic
Richfield Company to~
change the Prudhoe Oil
POol rUles to require 12
hours rather than 24 hours
for.. the pressure build up
time Period the Prudhoe
Oil': Pool, Prudhoe Bay
Field:
Notice is hereby given that
the Atlantl¢ Richfield Com-
pany has petitionecl the
Alaska Oil and Gas Conser-
vation Committee to
change Rule 6 (f) of the
Conservation Order No. 145
to require a .12 hour pres-
sui*e build up time period
rather that the 24 hour pe-
riod present.l¥ required.
The or~erator States that
good quality data can be
acc~uired With less opera-
tional downtime. The hear-
i~g will be held pursuant to
11 AAC 22.540 at 11:00 AM,
or following the hearing on
Cor~servatlon Order No.
145A i0 .the. basement of the
pioneer Schoolhouse,
Third and Eagle'* Streets,
Anchorage, Alaska on
November 29, 1977.
Thos. R. Marshall, Jr.
Executive Secretary
Alaska Oil and Gas
Conservation Committee
3001 Porcupine Drive
Anchorage, Alaska 99501
Pub: Nov. 3,1977
Notice of Public Hearing
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
Alaska Oil and Gas Conservation Cc~mittee
Conservation Order No. 145B
The request of the Atlantic Richfield Cc~pany to change the
Prudhoe Oil Pool rules to require 12 hours rather than 24
hours for the pressure build up tim~ period in the Prudhoe
Oil Pool, Prudhoe Bay Field.
Notice is hereby given that the Atlantic Richfield Ccmpany has petitioned
the Alaska Oil and Gas Conservation Cc~n%ittee to change Rule 6 (f) of
Conservation Order No. 145 to require a 12 hour pressure build up time
period rather than the 24 hour period presentlyrequired. The operator
states that good quality data can be acquired with less operational
downtime. The hearing willbe held pursuant to ll AAC 22.540 at
11:00 AM, or following the hearing on Conservation Order No. 145A in
the basement of the Pioneer SchoolhOuse, Third and Eagle Streets,
Anchorage, Alaska on November 29, 1977.
Thos. R. Marshall, Jr.
Executive Secretary
Alaska Oil and Gas Conservatior~Cc~mittee
3001 Porcupine Drive
Anchorage, Alaska 99501
Publish: November 3, 1977
~~
,AtlanticRichfieldCompany
North Americ-", Producing Division
,
North AI~' ,trict
Post Office t~ox 360
Anchorage, Alaska 99510
Telephone 907 277 5637
October 18, 1977
Mr. Hoyle Hamilton
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject' Prudhoe Bay Field
Reservoir Surveillance Program
Dear Sir'
After running pressure surveys on several well's at the
Drill Site #3 facility, our evaluation shows that the
24 hour buildup period is excessive. We find that some-
thing less than 12 hours is appropriate for the reservoir
at this stage. We propose a reduction in state require-
ment from 24 hours to 12 hours. This permits acquiring
good quality data with minimum down time.
A response on this matter at your earliest convenience
would be appreciated.
Very truly yours,.
H~old C. Heinze
HU~.: LET: er
RECEIVED
OCT 2 '! 1977
, ~ ..... ~.~