Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutCO 170Conservation Order Cover Page9
XHVZE
This page is required for administrative purposes in managing the scanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
_] '~.~ Conservation Order Category Identifier
Organizing
RESCAN
[] Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED (Scannable with large
plotter/scanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other '
BY:
~ARIA
Scanning Preparation
TOTAL PAGES --'7'
Production Scanning
Stage 1 PAGE COUNT FROM SCANNED DOCUMENT: ~--
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: YES ~ NO
Stage 2 IF NO IN STAGE 'l, PAGE(S) DISCREPANCIES WERE FOUND: ... YES NO
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
General Notes or Comments about this Document:
5/21/03 ConservOrdCvrPg.wpd
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: THE APPLICATION OF SOHIO )
ALASKA PETROLEUM COMPANY for)
an exception to 20 AAC )
25.035 (c)2 of the regula- )
tions for the drilling of )
the Challenge Island #1 Well)
Conservation Order No. 170
Sohio Alaska Petroleum
Company Challenge Island
Well.
October 14, 1980
IT APPEARING THAT:
le
Sohio Alaska Petroleum Company submitted an applicaton,
dated September 22, 1980, requesting an exception to
20 AAC 25.035(c)2 for the subject well. 20 AAC 25.035
(c)2 requires the working pressure of any BOP and
associated equipment to exceed the maximum surface
pressure to which they may be subjected.
·
Sohio Alaska Petroleum Company states that, although
the maximum eStimated surface pressure that could be
encountered in the subject well is 8350 psi., it is not
considered safe or practical to use an annular preven-
ter to control pressures in excess of 5000 psi.
·
Sohio Alaska Petroleum Company reports that Draft
Arctic O.C.S. Order No. 2, Section 5.1.1 states that
the working pressure of a subsea annular preventer need
not exceed 5000 psi. and, although the subject well is
not a subsea configuration, the same requirements are
applicable.
·
Sohio Alaska Petroleum Company states that using an
annular preventer with a working pressure greater than
5000 psi. in conjunction with ram preventers with
working pressures of 10,000 psi. is excessive.
·
Sohio Alaska Petroleum Company further states that
using an annular preventer with a 5000 psi. working
pressure along with ram preventers with a 10,000 psi.
working pressure is a common practice and is accepted
industry wide.
·
Notice of the application was published in the ·
Anchorage Daily News on September 30, 1980.
Conservation .Order . 170
7. There were no protests to the application.
FINDINGS:
·
The BOP configuration proposed for the subject well is
in accordance with API RP 53, Section 2-C, which accepts
as safe a 5000 psi. annular preventer in conjunction
with 10,000 psi. ram preventers.
·
Sohio Alaska Petroleum Company will utilize two 10,000
psi. pipe ram preventers and a 10,000 psi. blind ram
preventer in addition to the annular preventer which
exceeds the requirements of 20 AAC 25.035(c)1.
·
Federal regulations have been changed so that the
proposed BOP configuration for the subject well is
acceptable as a safe practice.
0
Investigation by the Alaska Oil and Gas Conservation
Commission indicates that the use of a 10,000 psi.
working pressure annular preventer does not offer
greater safety than a 5000 psi. working Pressure annu-
lar preventer and, if tested frequently, the higher
working pressure annular preventer could be less safe.
CONCLUSION:
The requested exception will not result in a drilling
operation that is unsafe and, in fact, the exception could make
the operation safer.
NOW, THEREFORE, IT IS ORDERED THAT:
The Sohio Alaska Petroleum Company is exempted from the
requirements of 20 AAC 25.035(c)2 and may drill the Challenge
Island #1 well using a 5000 psi. working pressure annular pre-
venter in conjunction with the 10,000 psi. working pressure ram
preventers.
DONE at Anchorage, Alaska and dated October 14, 1980.
H6'y l'e~. H~milt~n '
Chai r~an / Commi s s ioner
Alaska Oil and Gas Conservation Commission
Harry W. Kufgler
Commi s s ioner
Alaska Oil and Gas Conservation Commission
-2-
2. PUBLISHER
ADVERTISING
ORDER
': NOTICE TO PUBLISHER
INVOICE MUST BE IN TRIPLICATE SHOWING ADVERTISING
ORDER NO., CERTIFIED AFFIDAVIT OF PUBLICATION (PART
2 OF THIS FORM) WITH ATTACHED COPY OF ADVERTISE-
MENT MUST BE SUBMITTED WITH INVOICE.
I~nd.!orage Dail~~' i,~ews
?otter .TcoarJ,
~ IPouch 6616
IAlaska Oil & Cas C~e~-ation Cc~;a~ission
~300i Por~~e Pri~
l~:c. ra~e, Alaska 99501
VENDOR NO.
DEPT. NO. A.O. NO.
4050
DATE O~
c~m=oi..-er 30, :I. ggo
DATES ADVERTISEMENT REQUIRED:
THE MATERIAL BETWEEN THE DOUBLE LINES MUST BE PRINTED IN
ITS ENTIRETY ON THE DATES SHOWN.
BILLING ADDRESS:
AFFIDAVIT-OF-PUBLICATION
UNITED STATES OF AMERICA
STATE OF ,,~//¢:5,~'/tf
T~l l~ DIVISION.
BEFORE ME, THE UNDERSIGNED, A NOTARY PUBLIC THIS DAY
PERSONALLY APPEARED_'~//~/~4. /74c//~z>~& WHO.
!
BEING FIRST DULY SWORN, ACCORDING TO LAW, SAYS THAT
PUBLISHED AT /~//-z3,~/~--~' IN SAID DIVISION
, 7-/~,~i/ ...... AND STATE OF. ~//4/$4'/~ AND THATTHE
ADVERTISEMENT, OF WHICH THE ANNEXED IS A TRUE COPY,
WAS PUBLISHED IN SAID PUBLICATION ON THE / ,DAY OF
)V/~l/~',~, -~,¢," 19ff~_~, AND THEREAFTER FOR. I
cONgECUTP,/E DAY,~, THE LAST PUBLICATION APPEARING ON
THE ! DAY OF )¥t¢3/e'f~t.,~.¢/" 19.~ AND THAT THE
RATE CHARGED THEREON IS NOT IN EXCESS OF THE RATE
CHARGED PRIVATE INDIVIDUALS.
SUBSCRIBED AND SWORN TO BEFORE ME
THIS _~<--=:v-. DAY O~'~ 19.~,..
NOTARY PUBLICdOR STATE OF
MY COMMISSION EXPIRES
REMINDER-
ATTACH INVOICES AND PROOF OF PUBLICATION.
, ,OT,CEO~ PUSL,C I Parties Wh'O' m.a~ '~e.,,-It
' , HEARING l. arleved If tl~e reterencea or-'Il
." ',',. S.I'.AT. EO_.F. AL.A_S.KA ' I a~r is issue, a're..,~llowed t011
.. ' AtaSKaO _ano(5.as. , . l. days' from the'.'..qate of this
',,,, C_onservat. ion ~_o..m.m. issj_o.n. I, publ'catlon li~ :.,ymc.h.tq..flle a II
"" '.'rgonservaTion Pile No,.~/u' '/ protest 'n ,vr~fing. stating' in II
a'~" "Ch',,,.. t . ' ~e'a .' t.he -ature cf the ag-
_ ;" e a.pplica ionpf.Exxonl . ~rlevement, and.a request f6r
'(:ompany, U.$.A,, daTeo I a hearing. T,he'~ .ace of filing
October.24, 1980, forqn oraer.I is the AlasKa Ou ano
I g_ra.n.tlog..arLe_x.c~l~tio, n..TO / Conservation Comm s~ion I
I..&,~U..AA~.Z~,U~.~{CLZ.0.t me r. egu-.I. 3001 Porcupine Drive. . 'i
I',,f',:L~.tL0.n~. toe Tne a.rjlling o!' mei AnchOraa L Alaska '99501., Ill
t'":'" to,i~wlng Arctic Slope we,s:: 'l" 'sbch a .p?oetest is timely ~le.d,
:'," ": .. ....... · .... ....... . ..... a', hearlng,.on~,~the., m~tter 'will
i:, !L,:~,°Jn,t Thomson . '1.. be'held et the'above a. ddress[
'.'!"!.'...',':,,o"A, lask;~', sta'fe "E"..~iaeg.tr~l ~}l..no' : such_.prot?st..Is' ' ' '
I'"':: ".' ' .. ''. I .ti.m..ely.'filed; the ~.ommlsslon. II
~' ;"Pt'ice Is I~ereb "' Ivan that W,I consider the msuance mil
/ "E~ _ Y.¢_. . . 'theorderwlthoutahearlng; II
'~xxon.co.m. pan. y u.,~.A, nas. , ' '
r,.egue-S~ed' me A..LaSKa O I al~d Harry W Kugler
: ~'as .co.nser, vat~ori .commls.'- . COmrfni.~lon~r , . .
.stun' to jssue ..an. o.roe..r gr_a_n~ Alaska O I end ~as
: ing.'an exc.eptm0,.3o'me ~uK ' Conservation. Commission_
e~luiDmenf reol~'lr~ments pt ' .
the refer,.,'~¢ea re.;iub-,: o~ for .'. PUb.' Nevember l, 1980
'the throe .:xDlora'or,' ::ells ,.. .
listec 4:;~.,'e. 'f[,e c,.;erator
proposes 1o usP for c.,'..cl' #ell ~'""
a ~.~n¢= r:s <ins?ea~ of L%000 ...............................
ID~i: a,~"d':!r p,"e,,,--,- In
cort un,'" O:'l '.'.,,+~ tt':~?..'..LI~000
o?,; r~m p-evente~s ',he op-
.,',,"aeor ..'¢~,.':,: that °h s is In
accoro~..."c,., ;;;tn AP, R.'= 53,.'
Sc:'ior: -~C an~ t,;s s tn,
a:corc .'.:T~ acc.zptec safe
, ,':.....L.'..~,.L .,. ~
E £ E i V E D
NOV 7 1389
Alaska 011 & Gas Cons. Commission
Anchorage
" 2. PUBI_ISHER
ADVERTISING
ORDER
NOTICE TO PUBLISHER
INVOICE MUST BE IN TRIPLICATE SHOWING ADVERTISING
ORDER NO., CERTIFIEDAFFIDAVIT OF PUBLICATION (PART
2 OF THIS FORM) WITH ATTACHED COPY OF ADVERTISE-
MENT MUST BE SUBMITTED WITH INVOICE.
Anchorage Daily
200 Potter Road
Pouch 6616
Anchorage, Alas'ka 99502
Ala~.~a Oil & Gas Cor~~tion Co,nmission
3001 Porcupine Drive
Anchorage, .Alaska 99501
VENDOR NO.
DEPT. NO. A.D. NO.
4049
DATE OE A.O. .
Se~ters~r 26, 1980
DATES ADVERTISEMENT REQUIRED:
Septe~,~er 30, 1980
THE MATERIAL BETWEEN THE DOUBLE LINES MUST BE PRINTED IN
ITS ENTIRETY ON THE DATES SHOWN.
BILLING ADDRESS:
AFFIDAVIT-OF-PUBLICATION
UNITED STATES OF AM/ERICA
./ '
BEFORE ME, THE UNDERSIGNED, A. NOTARY PU, E/L., lC THIS DAY
BEING FIRST DULY SWORN, ACCORDING T..O--LAW, ~AYS THAT
---,.//// / - __
PUBLIS~D AT [~/4A~ ~-~' f ~AID DIVISION
~~~AND STATE OF ~~ AND THAT THE
ADVERTISEMENT, OF WHICH THE ANNEXED IS A TRUE COPY,
WAS PUBLISHED IN SAID PUBLICATION ON THE ,~/j DAY OF
J:~*-"-~, ~/-6--(. 10~, AND THEREAFTER FOR /
CONSECUTIVE DAYS], THE LAST PUBLICATION APPEARING ON
THE ~ ,DAY OF~~c,~-- 19~, AND THAT THE
'V
RATE CHARGED THEREON IS NOT IN EXCESS OF THE ,RATE
CHARGED PRIVATE INDIVIDUALS. :"
/.--',,:'.?., i/...,,
.~.:" t. L /'
SUBSCRIBED AND SWORN TO BEFORE ME ':"'? c:,'
THIS'"7''C~ _DAY O.F...~._c.:~~ lg,~Z2. ::' ';~'"'":~'
NOTARY PUBLIC FO~/ STATE OF ~ ~""'~--~. *--' "'
MY COMMISSION EXPIRES
REMINDER-
ATTACH INVOICES AND PROOF OF PUBLICATION.
..... ,N~'TICE oF PUBLI(.~
HEARING ,
STATE OF ALASKA
Alaska Oil and GaS
Cor~servatton Comm.:ission
C0~,ervation.F lie N o. 170
Re: The application of Sohio
Alaska Petfoleum Company,:
dated ~eptemb~r 22, 1980, forJ
an or,er graining an exceP:l
tio~ :to. 20 AAC. 25.035(c)20tl
the'r~g~lations~f~r th'e ~ril .]
~ i.ng of the Challenge Island
.' 'NbJJ~e is hereby give~ that
~he .5ohio Alaska PetrOleumi
~gmpany, has req~sted theJ
AI8SK~ Oil and GaS conserva-
tion Commission to 'issue
Order granting an ,exception
~' the ~0p equ p~ent re:J
quirq~ems of the reterencea/
regulation for the Challenge/
ISland ~1 an exploratory/
Well. The operator states that~
the use of an. annular preven4
t~r with a ratin~ greater thanj
5,000 psi woul~6e excessivel
and that the'use of a 5,000 psi~
annular preventor in coniunc-/
tio~. with 10,000 psi ram pre1
ventors is in accordance withJ
APl RP 53, Section'2-C. TheJ
operator further states that JtJ
~ not.consi'dered a Safe
rice .to attempt to control
:pressures in .excess of 5 ~0/
psi with an' annular preven4
' tot. ,
PaCt'les who: may be ag.
'.grieved if the referenced or-
de~ is issued ,,'are allowed 1~
.days from .t~e ~ate' of thi:
' publication in~ which 'to fil~
prgtest in writing, st~ting~
'ae?ail the nature of me a.
gr evement, end e .request fl
a'.hearing. The p ace of fi r
s 'the Ala~Ra Oil and G~
Conservation Commission,
3~1 Porcupine Drive, An-
chorage, Alaska 99501. If
such ~ protest is timely filed,
a nearing on the matter will
be he d at the above address
at 9:00 A~ on October 14,
1980 at wflich time protes*
tents and others may be
.~ear~. If no .SUCh protest s
timew filed, the Commission
Will consider the issuance of
the order without a hearing.
,
~erry W. Kugler
commissioner
Alaska Oil and Gas
Conservation Commission
Pu~: Se~ember 30, ~980
AO'08 404~.,...
NOTICE OF PUBLIC HEARING
STATE OF ALASKA
Alaska Oil and Gas Conservation Commission
Conservation File No. 170
Re: The application of Sohio Alaska Petroleum Company, dated
September 22, 1980, for an order granting an exception to 20
AAC 25.035(c)2 of the regulations for the drilling of the
Challenge Island #1 Well.
Notice is hereby given that the Sohio Alaska Petroleum
Company has requested the Alaska Oil and Gas Conservation Com-
mission to issue an order granting an exception to the BOP equip-
ment requirements of the referenced regulation for the Challenge
Island 91, an exploratory well. The operator states that the use
of an annular preventer with a rating greater than 5,000 psi
would be excessive and that the use of a 5,000 psi annular pre-
ventor in conjunction with 10,000 psi ram preventors is in accor-
dance with API RP 53, Section 2-C. The operator further states
that it is not considered a safe practice to attempt to control
pressures in excess of 5,000 psi with an annular preventor.
Parties who may be aggrieved if the referenced order is
issued are allowed 10 days from the date of this publication in
which to file a protest in writing, stating in detail the nature
of the aggrievement, and a request for a hearing. The place of
filing is the Alaska Oil and Gas Conservation Commission, 3001
Porcupine Drive, Anchorage, Alaska 99501. If such a protest is
timely filed, a hearing on the matter will be held at the above
address at 9:00 AM on October 14, 1980 at which time protestants
and others may be heard. If no such protest is timely filed, the
Commission will consider the issuance of the order without a
hearing.
Harry W. Kugler
Commissioner
Alaska Oil and Gas Conservation Commission
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Mr. Lonnie Smith
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
AnChorage, Alaska 99501
September 22, 1980
Dear Mr. Smith:
This letter is an application for exception to the State of Alaska Regulation 20 AAC
25.035, Section (c), Paragraph 2, for the drilling of the Challenge Island exploratory
well by Sohio Alaska Petroleum Company. In our letter to you dated August 26, 1980,
we stated that the estimated bottomhole pressure will be 9850 psi at 13,000 ft. TVDss
in the Challenge Island #1 well. With a gas gradient of 0.116 psi/ft., the maximum
possible surface pressure can be calculated to be 8350 psi. Regulation 20 AAC 25.035,
Section (c), Paragraph 2 states:
"The working pressure of any BOP and associated equipment must exceed the
maximum surface pressure to which they may be subjected .... "
Attached is a diagram of the stack arrangement for the blowout prevention equipment
we are submitting to your department for approval to be used for this exploratory well.
This configuration is in accordance with API RP 53, Section 2-C. The utilization of
two pipe ram preventers exceeds the provisions stated in Regulation 20 AAC 25.035,
Section (c), Paragraph 1.
It is not considered safe or practical to use an annular preventer to attempt to control
pressures in excess of 5000 psi. Draft Arctic O.C.S. Order No. 2, Section 5.1.1. states
that the working pressure of a subsea annular preventer need not exceed 5000 psi.
Although the case in hand is not a subsea configuration, we believe that using anything
greater than a 5000 psi annular preventer along with 10,000 psi ram preventers which is
practiced and accepted industry wide, would only be excessive.
RHR:DMS:ja
cc: W. R. Hicks
P. R. Judd
A. M. Reid
R. H. Reiley
D. M. Skelton
J. F. Votava
CC# 29,227
Yours very truly,
B.O.P.. eTACK CONt-IGUHA I,"~N
I~ ~.a" T~I~L~ ~AM STUd..
I t
ANNULAR J
PREVENTER 5000#
I 1
I 1
.............
I 1
I ]
1 1
'DRIL LING
SPOOL
2 9/16" K I L L LIN E
CHECK GATE
10,000#
10,000#
,I
4 1/16"CHOKE LINE
GATE GATE
I ]
1 1
I I'-
H.C.R..
10,000#
34